Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
HOME
EVENTS
DATA
Data List
Drilling
Production
Orders
Data Miner
Document Search
REPORTS
Reports and Charts
Pool Statistics
FORMS
LINKS
Links
Test Notification
Data Requests
Regulations
Industry Guidance Bulletins
How to Apply
ABOUT US
History
Staff
HELP
Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
188-128
Ima~ ~roject Well History File Cover" )ge XHVZE This page identifies those items that were not scanned during the initial production scanning phase. They are available in the original file, may be scanned during a special rescan activity or are viewable by direct inspection of the file. J f r- j ,2 % Well History File Identifier Organizing (done) RESCAN ~o-Sided o Rescan Needed o Color items: o Diskettes, No. OVERSIZED (Scanna_ble) ~'Maps: DIGITAL DATA o Grayscale items: o Other, NolType o Other items scannable by large scanner o Poor Quality Originals: o Other: OVERSI7'--,;!onwScannable) NOTES: Logs of various kinds o Other BY: BEVERLY BREN VINCENT SHERYL MARIA LOWEll. DATE: /s/ Project Proofing BY: BEVERLY BREN VINCENT SHERYL MARIA LOWELL DATE: /s/ Scanning Preparation i x 30 = /,;20 + 17 = TOTAL PAGES 13 7 BY: BEVERLY BREN VINCENT SHERYL MARIA LOWELL DATE: /s/ Production Scanning Stage 1 PAGE COUNT FROM SCANNED FILE: }31 ~. PAGE COUNT MATCHES NUMBER IN SCANNING PREPARATION: ~ES . NO BV: BEVERLV BRE~HERVL MARIA LowElL DATE?-fif;2JiL ¿/ß Stage 2 IF NO IN STAGE 1, PAGE(S) DISCREPANCIES WERE FOUND: YES NO BY: BEVERLY BREN VINCENT SHERYL MARIA LOWELL DATE: /s/ (SCANNING IS COMPLETE AT THIS POINT UNLESS SPECIAL ATTENTION IS REQUIRED ON AN INDIVIDUAL PAGE BASIS DUE TO QUAlITY, GRAYSCAlE OR COlOR IMAGES) ReScanned (individual page {special attention} scanning completed) RESCANNED BY: BEVERLY BRE~INCEN0HERYL MARIA LOWELL DATE:¿;-/;sj.2JB1 tJ (3 General Notes or Comments about this file: Quality Checked (done) 1 O/25102Rev3NOTScanned. wpd UNSCANNED, OVERSIZED MATERIALS AVAILABLE: /~~ ~ 02~' FILE # ~~ To request any/all of the above information, please contact: Alaska Oil & Gas Conservation Commission ~ 333 W. 7th Ave., Ste. 100 Anchorage, Alaska 99501 Voice (907) 279-1433 -Fax (907) 276-7542 .RECEIVED STATE OF ALASKA FEB 0 6 2014 ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LO6OGCC la. Well Status: 0 Oil 0 Gas 0 SPLUG 0 Other ®Abandoned 0 Suspended lb. Well Class 20AAC 25.105 20AAC 25.110 0 Exploratory 0 Stratigraphic 0 GINJ 0 WINJ 0 WAG 0 WDSPL 0 Other No.of Completions Zero IS Development 0 Service 2. Operator Name: 5.Date Comp.,Susp.,or Aband.: 12. Permit to Drill Number: BP Exploration(Alaska) Inc. 1/16/2014 ' 188-128 313-282 3. Address: 6. Date Spudded: 13. API Number: P.O. Box 196612,Anchorage,Alaska 99519-6612 11/12/1988 50-029-21880-00-00 4a. Location of Well(Governmental Section): 7.Date T.D.Reached: 14. Well Name and Number: Surface: 11/26/1988 PBU W-18 731' FNL, 1182' FEL, Sec.21,T11N, R12E, UM Top of Productive Horizon: 8. KB(ft above MSL): 82' 15.Field/Pool(s) 742'FNL, 390'FWL, Sec.22,T11N, R12E, UM GL(ft above MSL): 52.88' Prudhoe Bay/Prudhoe Bay Total Depth: 9.Plug Back Depth(MD+TVD) 768'FNL, 513'FWL, Sec.22,T11N, R12E, UM 9070' 8751' 4b. Location of Well(State Base Plane Coordinates,NAD: 10.Total Depth(MD+TVD) 16. Property Designation: Surface: x- 612049 y- 5959526 Zone- ASP4 9550' • 9206' ADL 028263 - TPI: x- 613621 y- 5959539 Zone- ASP4 11.SSSV Depth(MD+TVD) 17. Land Use Permit: Total Depth:x- 613745 Y- 5959514 Zone- ASP4 None 18.Directional Surve Y ❑Yes ®No 19.Water depth,if offshore: 20. Thickness of Permafrost(TVD):(Submit electronic and printed information per 20 AAC 25.050) N/A ft MSL 1862' 21. Logs Obtained (List all logs here and submit electronic and printed information per 20 AAC 25.071): 22.Re-Drill/Lateral Top Window MD/TVD: GR/DIL/BHC/CNL N/A 23. CASING,LINER AND CEMENTING RECORD SETTING DEPTH MD SETTING DEPTH ND HOLE AMOUNT CASING WT.PER FT. GRADE Top BOTTOM TOP BOTTOM SIZE CEMENTING RECORD PULLED 20" Conductor 30' 110' 30' 110' 13-3/8" 68# L-80 29' 2663' 29' 2663' 17-1/2" 3830 cu ft Permafrost 9-5/8" 47# NT-80S 28' 9003' 28' 8687' 12-1/4" 1772 cu ft Class'G' 7" 26# L-80 8736' 9550' 8435' 9206' 8-1/2" 251 cu ft Class'G' 24. Open to production or injection? 0 Yes ®No 25. TUBING RECORD If Yes,list each interval open SIZE DEPTH SET(MD) PACKER SET(MD/ND (MD+TVD of Top&Bottom;Perforation Size and Number): ) 3-1/2",9.2#, L-80/ 8765'; 8508'/8223';8638'/8344'; 3-1/2",9.3#, 13Cr80 9353'-9363' 8684'/8386';9353'/9019' 26. ACID,FRACTURE,CEMENT SQUEEZE,ETC. MAY f� 1 WAS HYDRAULIC FRACTURING USED DURING COMPLETION?❑Yes ®No SCANN��{{��,ED MAY 2 1 2014 DEPTH INTERVAL(MD) AMOUNT AND KIND OF MATERIAL USED 8809'-9362' 33 Bbls Class'G' 8795'-8809' ,6 Bbls Class'G(Milled to 9130') 9070' Set Whipstock 27. PRODUCTION TEST ! Date First Production Method of Operation(Flowing,Gas Lift,etc Not on Production N/A Date of Test Hours Tested Production For OIL-BBL: GAS-MCF: WATER-BBL: CHOKE SIZE: GAS-OIL RATIO: Test Period Flow Tubing Casing Press: Calculated OIL-BBL: .GAS-MCF: .WATER-BBL: OIL GRAVITY-API(CORR): Press. 24-Hour Rate 28. CORE DATA Conventional Core(s)Acquired? 0 Yes ®No Sidewall Core(s)Acquired? 0 Yes ®No If Yes to either question,list formations and intervals cored(MD+TVD of top and bottom of each),and summarize lithology and presence of oil,gas or water (submit separate sheets with this form, if needed). Submit detailed descriptions,core chips,photographs and laboratory analytical results per 20 AAC 250.071. None RBE,MS MAR 21 2 Form 10-407 Revised 10/2012 CONTINUEDON REVERSE Submit Original Only /� V't-F 4/25//4-• , 6/F<% ; 5 S z(., G 29. GEOLOGIC MARKERS(List all formations ar ricers encounter 30. FORMATION TESTS NAME MD ND Well Tested? 0 Yes ®No Permafrost Top If yes,list intervals and formations tested,briefly summarizing test Permafrost Base results. Attach separate sheets to this form,if needed,and submit detailed test information per 20 AAC 25.071. Sag River 9011' 8695' None Shublik A 9039' 8721' Zone 4 9158' 8834' Formation at Total Depth: 31.List of Attachment: Summary of Pre-Rig Work, Summary of Daily Drilling Reports,Well Schematic Diagram 32.I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact: Nathan Sperry,564-4258 Email: Nathan.Sperry@bp.com Printed:::ure:Joe Lastufka Title: Drilling Technologist ` \ t ' J � \ Phone 564-4091Date:2,/C9 INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. Item la: Classification of Service Wells: Gas Injection,Water Injection,Water-Alternating-Gas Injection,Salt Water Disposal,Water Supply for Injection, Observation,or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. Item 4b: TPI(Top of Producing Interval). Item 8: The Kelly Bushing and Ground Level elevation in feet above mean sea level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. Item 13: The API number reported to AOGCC must be 14 digits(ex: 50-029-20123-00-00). Item 20: Report true vertical thickness of permafrost in Box 20. Provide MD and ND for the top and base of permafrost in Box 28. Item 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. Item 24: If this well is completed for separate production from more than one interval(multiple completion),so state in item 1,and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Item 27: Method of Operation: Flowing,Gas Lift,Rod Pump,Hydraulic Pump,Submersible,Water Injection,Gas Injection,Shut-In,or Other(explain). Item 28: Provide a listing of intervals cored and the corresponding formations,and a brief description in this box. Submit detailed description and analytical laboratory information required by 20 AAC 25.071. Item 30: Provide a listing of intervals tested and the corresponding formation,and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Form 10-407 Revised 10/2012 Submit Original Only W-18, Well History (Pre Rig Sidetrack) Date Summary 12/11/13 HES CTU- 1.75"Coil. Job Objective: Mill CBPs, Jewelry Log, P&A. Load well w/150 bbls 1%slick KCL followed by 50 bbls of diesel. RIH to yellow flag and correct depth to 8624.18'. RIH to yellow/pink flag and lay in 33bbls of 16.5 ppg cmt. Perform hesitation squeeze(see log for details). Squeeze an estimated 9.4bbls behind pipe. RIH and clean out cement to 8720'chasing returns OOH at 80%. FP well w/18bbls of 60/40 methanol. RDMO. 12/15/13 DRIFT W/2.70"CENT&2"SAMPLE BAILER. TAG TOC @ 8802'SLM. OBTAIN SAMPLE OF CEMENT. 12/16/13 DRIFT W/20'x 2.70" DMY WHIPSTOCK.TAG TOC @ 8802'SLM. DRIFT W/2.78"CENT&TAG 2.75" X-NIP @ 8622'SLM (8629'MD). -+7'CORRECTION TO MD.TOC DEPTH @ 8809' MD. CORRECTED. 12/19/13 CTU#6- 1.75"Coil (CTV=34.6). Job Objective: Cement P&A Top Off. Road CTU from yard and MIRU. Perform BOP test. Make up 2.0" BDJSN. PT previous cement to 1540 and lose 30 psi in 10 min. RIH and tag top of cement at 8820 CTMD and correct to 8809'. Lay in 6.0 bbls of 16.3 ppg class G cement to 8250'. Contaminate with Powervis down to 8700', leaving 2.1 bbls in hole. POOH at 80%washing jewelry. Well FP with 60/40 methanol. 12/19/13 CTU#6- 1.75"Coil. Job Objective: Cement P&A Top Off. Road CTU from yard and MIRU. Perform BOP test. 12/20/13 CTU#6- 1.75"Coil. Trap 325 psi of WHP. RDMO CTU. 12/24/13 T/I/O= 100/190/40 Temp=SI MIT-T PASSED to 3000 psi(Post rig) Pressured up Tbg with 1.5 bbls meth. Tbg lost 151 psi in 1st 15 mins and 68 psi in 2nd 15 mins for a total loss of 219 psi in 30 min test. Bled pressure back, bled-1.5 bbls meth. Final WHPs 0/190/40. SV,SSV,WV=Shut MV,IA,OA=Open. 12/29/13 T/1/0=29/200/0. Pre CTD. Install Quik Test Sub, untapped blind flange. Set 4"TWC#425.Torque Tree Flanges.Test Tree. Pulled 4"TWC#425. Final WHP's Vac/200/0. Page 1 of 1 • North America-ALASKA-BP Page 1 oay Operation Summary Report Common Well Name:W-18 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:1/9/2014 End Date: X3-013T7-C:(3,605,065.00) Project:Prudhoe Bay Site:PB W Pad Rig Name/No.:NORDIC 1 Spud Date/Time:11/12/1988 12:00:00AM Rig Release: Rig Contractor NORDIC CALISTA UWI:500292188000 Active datum:Kelly Bushing/Rotary Table @82.00usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 1/9/2014 05:00 - 07:10 2.17 MOB P PRE PREP RIG TO MOVE OFF WELL 07:10 - 07:30 0.33 MOB P PRE PJSM TO MOVE RIG OFF THE WELL 07:30 - 08:15 0.75 MOB P PRE CLOSE ALL TREE VALVES PRIOR TO MOVING OFF IAP=0 PSI OAP=0 PSI WHP=0 PSI MOVE RIG OFF WELL 'HAVING TROUBLE WITH THE DRIVE SYSTEM, RIG MOVES ABOUT 6'THEN STOPS SHOVEL SMALL DRIFTS FROM IN FRONT OF THE RIG TIRES,SHOULDN'T BE ENOUGH TO STOP THE RIG RIG WILL STILL ONLY MOVE-6'THEN STOPS CHECK DRIVE MOTORS 08:15 - 09:00 0.75 MOB P PRE RIG MOVED OFF WELL,STAGE ON PAD TO LOAD OUT AND BHI TOOLS AND LOAD TINY TOOLS ON THE RIG 09:00 - 09:30 0.50 MOB P PRE WWTF COMPLETED AND WELL HANDED BACK OVER TO DS OPERATOR TOOL PUSHER AND DRILLER MAKING ROUTE DRIVE TO W-PAD _ CH2 BACKING UNDER SAT OFFICE 09:30 - 20:00 10.50 MOB P PRE MOVE SAT OFFICE TO W-PAD 20:00 - 23:30 3.50 MOB N WAIT PRE BP SECURITY ANNOUNCES PHASE II WEATHER WITH VISIBILITY<500'.HOLD SAFETY MEETING INVOLVING NORDIC,BP SECURITY AND BP WSL AND CONCLUDE THAT IT IS UNSAFE TO CONTINUE RIGMOVE UNTIL WEATHER IMPROVES. SIT DOWN RIG SO MOVING SYSTEM CAN BE KEPT WARM. 23:30 - 00:00 0.50 MOB N WAIT PRE PERFORM ROUTE-DRIVE TO INSPECT SPINE-ROAD UP TO J-PAD. 1/10/2014 00:00 - 00:30 0.50 MOB N WAIT PRE HOLD SAFETY MEETING WITH WSL, SECURITY OFFICER AND NORDIC.DECIDE TO CONTINUE RIG MOVE. 00:30 - 01:45 1.25 MOB N WAIT PRE WAIT FOR ROADS&PADS TO CLEAR PIPELINE ROAD BETWEEN GC1 &GC2 TO ALLOW FOR EMERGENCY TRAVEL WHILE RIG BLOCKS SPINE ROAD. 01:45 - 06:00 4.25 MOB P PRE CONTINUE RIG MOVE TO W-PAD. 06:00 - 07:30 1.50 MOB P PRE STOP AT M-PAD ACCESS ROAD FOR FIELD CREW CHANGE 06:30 VAC TRUCK BROKE WHILE GETTING ON RIG MATS TO CROSS THE BRIDGE 07:30 - 12:00 4.50 MOB P PRE VAC TRUCK MOVED,CONTINUE MOVE TO W-PAD ****07:30 CHUCK SHEEVE WITH THE STATE HAS WAIVED WITNESSING OUR BOP TEST**** 12:00 - 12:45 0.75 MOB P PRE RIG ON W-PAD,SPOT T-MATS OVER CELLAR 12:45 - 13:15 0.50 MOB P PRE T-MATS SPOTTED,LET CREW WARM UP WHP'S T=0 PSI IAP=0 PSI OAP=0 PSI SHUT IN ALL TREE VALVES TO SPOT RIG 13:15 - 13:45 0.50 MOB P PRE HOLD PJSM TO SPOT RIG OVER WELL • 13:45 - 14:30 0.75 MOB P PRE SPOT RIG OVER WELL Printed 1/21/2014 9:26:41AM North America-ALASKA-BP Page 2 0U1' Operation Summary Report Common Well Name:W-18 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:1/9/2014 End Date: X3-013T7-C:(3,605,065.00) Project:Prudhoe Bay Site:PB W Pad Rig Name/No.:NORDIC 1 Spud Date/Time:11/12/1988 12:00:00AM Rig Release: Rig Contractor:NORDIC CALISTA UWI:500292188000 Active datum:Kelly Bushing/Rotary Table©82.00usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 14:30 - 15:30 1.00 MOB P PRE RIG SPOTTED OVER WELL.RIG ACCEPT AT 14:30HRS.START RU BOPE. HOLD PJSM,THEN PERFORM LEAK TIGHT TEST WITH METHANOL FOR TREE CAP REMOVAL. '15:30 - 16:30 1.00 MOB P PRE ND TREE CAP,THEN HOLD EVACUATION DRILL. ----- ---- ----- - 16:30 - 19:00 2.50 MOB P PRE NU BOPE AND CHECKED HCR FLANGE BOLTS. 119:00 - 00:00 5.00 MOB P PRE HOLD PJSM,THEN CHANGE-OUT INNER KILL VALVE. 1/11/2014 00:00 - 03:00 3.00 MOB P PRE COMPLETE CHANGING OUT INNER KILL VALVE,ALSO CHANGE OUT TARGET"T". GREASE ALL VALVES ON MUDCROSS. 03:00 - 04:30 1.50 MOB P PRE INSTALL BOP BRIDAL LINES AND SETUP HOT TUB.TAKE RKB-MEASUREMENTS. 04:30 - 05:00 0.50 MOB P PRE PERFORM RIG EVAC DRILL WITH ALL CREWS AND TRUCK DRIVERS. 05:00 - 06:30 1.50 MOB P PRE HOLD PJSM AND LOAD FIRST ROW OF 2-3/8" LINER INTO PIPESHED. CLEAR RIG AND PERFORM HPUSEKEEPING DUTIES. 06:30 - 07:00 0.50 MOB P F PRE .CREW CHANGE 07:00 - 07:15 0.25 MOB P PRE PJSM TO START TESTING BOPE 07:15 - 09:00 1.75 BOPSUR P I PRE DISABLE KILL LINE CHECK VALVE TO TEST THE KILL LINE TO THE HP MANIFOLD INSTALL TEST PLUG FLOOD STACK 09:00 - 09:05 0.08 BOPSUR N RREP PRE PERFORM LOW PSI SHELL TEST BLEED OFF PRESSURE,DOOR SEAL IS LEAKING 09:05 - 09:15 0.17 BOPSUR N RREP PRE HOLD APJSM TO REPLACE DOOR SEAL 09:15 - 10:05 0.83 BOPSUR N RREP PRE REPLACE DOOR SEAL 10:05 - 10:25 0.33 BOPSUR N ! HMAN PRE STOP OPERATIONS,CTD SUPERINTENDENT CALLED AND SAIDA FUEL TRUCK RAN OFF THE SPINE ROAD NEAR THE ENTRANCE OF W-PAD AND HAS POTENTUALLY BLOCKED THE ACCESS TO W-PAD.SEND SCS TO VERIFY 10:25 - 10:40 0.25 BOPSUR N RREP PRE THE TRUCK IS OFF IN THE TUNDRA AND IS NOT BLOCKING ACCESS TO THE PAD, CONTINUE OPERATIONS RETEST SHELL TEST 10:40 - 12:30 1.83 BOPSUR N RREP PRE ANOTHER DOOR SEAL IS LEAKING BLEED OFF PRESSURE AND SUCK OUT THE STACK 12:30 - 13:00 0.50 BOPSUR P PRE RESTART SHELL TEST GOOD LOW PT,CONTINUE TO HIGH GOOD HIGH PT Printed 1/21/2014 9:26:41AM • • North America-ALASKA-BP Page 3.4,1, Operation Summary Report Common Well Name:W-18 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:1/9/2014 End Date: X3-013T7-C:(3,605,065.00) Project:Prudhoe Bay Site:PB W Pad Rig Name/No.:NORDIC 1 Spud Date/Time:11/12/1988 12:00:00AM Rig Release: Rig Contractor:NORDIC CALISTA UWI:500292188000 Active datum:Kelly Bushing/Rotary Table @82.00usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 13:00 - 22:00 9.00 BOPSUR P PRE TEST BOP PER AOGCC AND BP REQUIREMENTS,250 PSI LOW AND 3500 PSI HIGH FUNCTION RAMS FROM DRILLER'S CONSOLE DURING THE TEST ALL RAMS TESTED WITH A 2"TEST JOINT TOP SET OF COMBI RAM'S ON LOWER TOT'S TESTED WITH 2-3/8"TEST JOINT ANNULAR TESTED WITH 2"AND 2-3/8"TEST JOINTS AOGCC REP CHUCK SCHEVE WAIVED WITNESSING THE BOP TEST PERFORM ACCUMULATOR DRAW-DOWN AND RECOVERY TEST -STARTING ACCUMULATOR PRESSURE= 2,900 PSI -FINAL PRESSURE AFTER FUNCTIONING ALL PREVENTERS AND HCR=2,000 PSI -16 SEC TO BUILD 200 PSI,104 SEC TO FULL PRESSURE. -3 NITROGEN BACKUP BOTTLES WITH 1,850 PSI. TEST ALL GAS ALARMS. CHOKE VALVE#3 WAS A FAIL/PASS AFTER REGREASING. WITNESS OF THE BOP TEST WAS WAIVED AOGCC-INSPECTOR,BUT WITNESSED BY BP WSL&NORDIC TOOLPUSHER. 22:00 - 23:15 1.25 RIGU P PRE HOLD PJSM.MEG ELINE CABLE AND THEN MU SLB CTC.PULL-TEST TO 38K LBS-GOOD TEST. 23:15 - 00:00 0.75 RIGU P PRE COMMENCE HEADING UP BHI UQC WHILE FILLING MGS. 1/12/2014 00:00 - 00:30 0.50 RIGU P PRE COMPLETE MU UQC.MEG CABLE AND ACHIEVE GOOD TEST. 00:30 - 01:45 1.25 RIGU P PRE PUSH 5BBLS METHANOL INTO REEL, LEAVING REELHOUSE IRON IS FILLED WITH KCL.PERFORM PRESSURE-TEST ON REELHOUSE IRON TO 300PSI/5MINS AND 4,000PSI/5MINS-ACHIEVE GOOD PRESSURE-TEST. 01:45 - 02:30 0.75 RIGU P PRE PUMP 2X COIL VOLUME FORWARD TO WARM UP THE COIL. 02:30 - 03:00 0.50 BOPSUR P PRE CLOSE IRV AND PRESSURE TEST IRV, PACK-OFFS AND QTS TO 300PSI/5MINS AND 3,500PSI/5MINS.ACHIEVE GOOD TEST. 03:00 - 03:45 0.75 BOPSUR P PRE UNSTAB INJECTOR AND SUCCESSFULLY PRESSURE-TEST CTC AND UQC. 03:45 - 04:15 0.50 BOPSUR P PRE HOLD PJSM FOR PULLING THE TEST PLUG, SUCK OUT BOP-STACK,CONFIRM NO PRESSURE BELOW SWAB VALVE. OPEN SWAB TO CONFIRM NO TRAPPED PRESSURE BENEATH THE TEST PLUG.NO FLOW,NO PRESSURE. RIG UP THE 2"TEST JOINT AND RECOVER TESTPLUG. 04:15 - 04:45 0.50 RIGU P PRE INSTALL RISER CAP AND PRESSURE-TEST PER WELLPLAN. 04:45 - 05:30 0.75 RIGU P PRE HOLD PJSM BEFORE OPENING THE WELL AGAINST THE RISER CAP AND CLOSED CHOKE.SIWHP=OPSI. Printed 1/21/2014 9:26:41AM • North America-ALASKA-BP Page 4.1afty Operation Summary Report Common Well Name:W-18 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:1/9/2014 End Date: X3-013T7-C:(3,605,065.00) Project:Prudhoe Bay Site:PB W Pad Rig Name/No.:NORDIC 1 Spud Date/Time:11/12/1988 12:00:00AM Rig Release: Rig Contractor.NORDIC CALISTA UWI:500292188000 Active datum:Kelly Bushing/Rotary Table @82.00usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 05:30 - 06:10 0.67 RIGU P PRE TOP UP WELL WITH METHANOL.SEE IMMEDIATE RETURNS(8.4PPG),SEE METHANOL(6.8PPG)AFTER 2.5 BBLS PUMPED-HOLE FULL. FLOWCHECK WELL FOR 15MINS.ACHIEVE GOOD NO FLOW. 06:10 - 07:15 1.08 CONDHL P WEXIT HOLD PJSM,THEN MAKE UP NOZZLE BHA (BHA#1)WITH NOZZLE,5FT STINGER, X-OVER,FLOAT SUB,BLIND SUB,UQC,CTC. 07:15 - 07:45 0.50 CONDHL P WEXIT STAB ON AND PT THE QTS HAND PUMP FOR TESTING THE QTS IS BROKE,CLOSE THE SWAB VALVE AND PT THE LUBRICATOR 07:45 - 09:15 1.50 CONDHL P WEXIT GOOD PT,RIH TAKING ALL RETURNS 09:15 - 09:40 0.42 CONDHL P WEXIT !INCREASE PUMP RATE TO 2.0 BPM LOOKING FORA HARD TAG,PU WT=32K NO TAG AT 8730'PU TO 8680'AND PU IS CLEAN RIH TO 8760'-100 PAST PROPOSED TOC AND STILL NO TAG PU AND CIRCULATE A BOTTOMS UP 09:40 - 09:45 0.08 CONDHL P WEXIT BROUGHT RETURNS BACK INSIDE TO CHECK FOR CMT,BOTTOMS UP WAS CLEAN AND NO CHANGE IN DENSITY RIH LOOKING FORA HARD TAG TAKING RETURNS BACK OUTSIDE 09:45 - 10:15 0.50 CONDHL P WEXIT TAG PU AND RETAG TAG AT THE SAME DEPTH HARD.CMT IS 100' DEEPER THAN WHERE IT WAS SUPPOSED TO BE. CALL ODE AND CIRC A BOTTOMS UP(46 BBLS)LOOKING FOR CHANGE IN DENSITY/ WET CMT BOTTOMS UP WAS CLEAN 10:15 - 10:25 0.17 CONDHL P WEXIT FLOW CHECK THE WELL TO POOH 10:25 - 12:00 1.58 CONDHL P WEXIT GOOD NO FLOW,POOH AND DISCUSS PLAN FORWARD WITH ODE 12:00 - 12:10 0.17 CONDHL P WEXIT FLOW CHECK WELL 12:10 - 12:25 0.25 CONDHL P WEXIT GOOD NO FLOW,TAG UP,REMOVE THE INJECTOR AND LD THE NOZZLE BHA 12:25 - 12:35 0.17 CONDHL P WEXIT BHA OOH,DISCUSS RUNNING THE MWD AND STRAIGHT MILLING BHA IN TO TIE IN AND TAG •TOC TERN MILL A FEW FEET TO ENSURE WE HAVE COMPETENT CMT 12:35 - 12:50 0.25 DRILL P WEXIT HOLD PJSM TO MU MILLING BHA 12:50 - 13:45 0.92 DRILL P WEXIT MU THE MILLING BHA PU THE INJECTOR,MU THE BHA,STAB ON •AND PT THE QTS 13:45 - 15:10 1.42 DRILL P WEXIT RIH 15:10 - 16:35 1.42 DRILL P WEXIT LOG TIE IN 16:35 - 16:45 0.17 DRILL P WEXIT CORRECT DEPTH+9',RIH TO TAG TOC,PUMP AT 0.75 BPM Printed 1/21/2014 9.26:41AM • North America-ALASKA-BP Page 5 Vat Operation Summary Report Common Well Name:W-18 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:1/9/2014 End Date: X3-013T7-C:(3,605,065.00) Project:Prudhoe Bay Site:PB W Pad Rig Name/No.:NORDIC 1 Spud Date/Time:11/12/1988 12:00:00AM Rig Release: Rig Contractor:NORDIC CALISTA UWI:500292188000 Active datum:Kelly Bushing/Rotary Table @82.00usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 16:45 - 17:15 0.50 DRILL P WEXIT TAG TOC @ 8795',PU AND RETAG TO CONFIRM WITH PUMPS AT 1.5 BPM TAG SAME DEPTH,MILLA LITTLE TO SEE IF WE HAVE COMPETENT CMT STALL AT 8803'3.25K WOB-40 FPH,PU IS CLEAN PAST TAG DEPTH WENT BACK DOWN TO SAME DEPTH AND STALLED LOOKS LIKE HARD CMT POOH TO LOG CCL TO VERIFY WHERE THE TT IS 17:15 - 17:50 0.58 DRILL P WEXIT LOG CCL FROM 8250'TO TAG AT 8802' BOTTOMS UP THERE IS A LOT OF FINE CMT WE MILLED PUMP A 20 BBL HI-VIS PILL 17:50 - 18:00 0.17 DRILL P WEXIT END CCL,PILLALMOST TO THE MILL WO CCL DATA 18:00 - 19:30 1.50 DRILL P WEXIT PILL OUT POOH 19:30 - 19:40 0.17 DRILL P WEXIT FLOWCHECK WELL WITH BHA#2 AT 200'. ACHIEVE GOOD NO FLOW. 19:40 - 20:00 0.33 DRILL P WEXIT PJSM BEFORE LAYING DOWN BHA. 20:00 - 20:30 0.50 DRILL P WEXIT LD BHA#2. 20:30 - 22:00 1.50 DRILL C WEXIT PREP RIGFLOOR FOR MU 2-3/8"LINER.LIFT FARR TONGS ONTO RIGFLOOR,CHECK DICE, COUNT PIPE IN PIPESHED. 22:00 - 23:30 1.50 DRILL C WEXIT HOLD PJSM WITH ALL CREWS INVOLVED AND START MU LINER.MU 2.80"BULLBOSE-2-7/8" PUP JOINT(CATCHER SUB)-RESTRICTOR SUB-XOVER.START MU 2-3/8"H511 CR-13 JOINTS. 23:30 - 00:00 0.50 DRILL C WEXIT NOTICE MARKS FROM FARR TONGS ON OUTSIDE OF JOINT#3.SELECT TO KICK OUT JOINT#3 AND REPLACE WITH JOINT#122. 1/13/2014 00:00 - 02:30 2.50 DRILL C WEXIT NOTICE ALSO MARKS ON JOINT#122 FROM FARR TONG.PERFORM FAULT-FINDING ON FARR-TONGS AND ADJUST BRAKE BAND ON TONGS SELECT TO KICK OUT ALSO JOINT#122 AND REPLACE WITH JOINT#120. 02:30 - 03:00 0.50 DRILL C WEXIT CONTINUE MU 2-3/8"H511 CR-13 JOINTS, WITH NO FURTHER DAMAGE DONE TO JOINTS. DRIFT EVERY CONNECTION MADE UP. 03:00 - 06:30 3.50 DRILL C WEXIT PERFORM KICK WHILE TRIPPING DRILL. MAKE UP FOSV AS PER STANDING ORDERS, THEN CONTINUE MAKING UP LINER. 06:30 - 06:50 0.33 DRILL C WEXIT HOLD PJSM TO CONTINUE LINER MU FOR LWP TESTS 06:50 - 07:45 0.92 DRILL C WEXIT TEST CROWN-O-MATIC MU REMAINING 43 JTS OF 2-3/8"CHROME LINER DRIFTING THE FIRST 5 CONNECTIONS WE MAKE AS PER THE WELL PLAN Printed 1/21/2014 9:26:41AM • North America-ALASKA-BP Page 6.61 Operation Summary Report Common Well Name:W-18 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:1/9/2014 End Date: X3-013T7-C:(3,605,065.00) Project:Prudhoe Bay Site:PB W Pad Rig Name/No.:NORDIC 1 Spud Date/Time:11/12/1988 12:00:00AM Rig Release: Rig Contractor:NORDIC CALISTA UWI:500292188000 Active datum:Kelly Bushing/Rotary Table @82.00usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 07:45 - 07:50 0.08 DRILL C WEXIT KWT DRILL WHILE RUNNING LINER MOTOR MAN CALLED UP FROM KOOMEY AND SAID ALL PRESSURES LOOK GOOD DRILLER FOLLOWED THE STANDING ORDERS AND STABBED THE FOSV,CLOSED THE VALVE,CLOSED THE BAG THEN CLOSED THE CHOKE HCR TO SECURE THE WELL. TOTAL TIME TO SECURE THE WELL WAS<1 MIN THEN HE NOTIFIED ME.GOOD JOB BY THE CREW 07:50 - 08:15 0.42 DRILL C WEXIT CONTINUE RUNNING LINER 08:15 - 08:30 0.25 DRILL C WEXIT LINER RAN PREP TO MU LWP TEST SUB 08:30 - 09:00 0.50 DRILL C WEXIT HOLD PJSM TO DISCUSS LWP TEST PROCEDURE 09:00 - 09:30 0.50 DRILL C WEXIT RU 2"HP HOSE,CHIKSAN AND 2"BLOCK VALVE TO PUMP LWP'S 09:30 - 10:10 0.67 DRILL C WEXIT BTT WOULD LIKE TO SIMULATE EVERYTHING WE DO ON A LINER JOS PUMP 100 BBLS THROUGH TUBING TO VERIFY TUBING IS CLEAR 10:10 - 12:10 2.00 DRILL C WEXIT PUMPED 100 BBLS A TEST RATE&PRESSURE=1.5 BPM 355 PSI CALCULATED VOLUME=13.65 BBLS LOAD DART#1 MODIFIED RIBBED ZERO PUMP TOTALS AND PUMP AT 1.5 BPM, 410 PSI PRESSURE SPIKE AT 13.4 BBLS LOAD DART#2 MODIFIED THREADED ZERO PUMP TOTALS AND PUMP AT 1.5 BPM, 400 PSI PRESSURE SPIKE AT 13.6 BBLS LOAD DART#3 MODIFIED GEN II THREADED ZERO PUMP TOTALS AND PUMP AT 1.5 BPM, 435 PSI PRESSURE SPIKE AT 13.6 BBLS LOAD DART#5 CONTROL T(UNMODIFIED) ZERO PUMP TOTALS AND PUMP AT 1.5 BPM, 462 PSI PRESSURE SPIKE AT 13.7 BBLS LOAD DART#6 CONTROL R(UNMODIFIED) ZERO PUMP TOTALS AND PUMP AT 1.5 BPM, 460 PSI PRESSURE SPIKE AT 13.7 BBLS LOAD DART#7 CONTROL N(UNMODIFIED) ZERO PUMP TOTALS AND PUMP AT 1.5 BPM, 460 PSI PRESSURE SPIKE AT 13.7 BBLS Printed 1/21/2014 9:26:41AM • • North America-ALASKA-BP Page 74E2.4 Operation Summary Report Common Wet Name:W-18 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:1/9/2014 End Date: :X3-013T7-C:(3,605,065.00) Project:Prudhoe Bay Site:PB W Pad Rig Name/No.:NORDIC 1 Spud Date/Time:11/12/1988 12:00:00AM Rig Release: Rig Contractor NORDIC CALISTA UWI:500292188000 Active datum:Kelly Bushing/Rotary Table t 82.00usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) _ 12:10 - 12:25 0.25 DRILL C WEXIT TESTING COMPLETED,LINE UP TO PUMP FRESH WATER TO FLUSH AND WASH THE LINER BEFORE LAYING DOWN EXCESS AND STANDING BACK WHAT WE NEED. 114 JTS RAN FOR THE TEST,WE WILL LD 34 JTS THEN STAND BACK 80 JTS OR 40 STANDS JOINTS 1-80=2467.68' 12:25 - 12:45 0.33 DRILL C WEXIT PUMPED 30 BBLS OF FRESH WATER TO • CLEAN THE LINER THAT WE WILL NOT RUN AND LD,SHUT DOWN PUMP AND LINE UP TO PUMP KCL DOWN THE COIL WHILE HOLDING A PJSM TO LD&STBK LINER 12:45 - 14:00 1.25 DRILL C WEXIT LD 34 SINGLES AND STBK 40 DOUBLES 14:00 - 14:30 0.50 DRILL C WEXIT 34 SINGLES LD,STOP FOR NORDIC CREW CHANGE 14:30 - 16:30 2.00 DRILL C WEXIT TEST CROWN-O-MATIC BEFORE PULLING STANDS WITH NEW CREW THEN START PULLING LINER 16:30 - 16:50 0.33 DRILLC WEXIT ALL SEVEN LWP'S SHOWED NORMAL WEAR 16:50 - 17:10 0.33 DRILL C WEXIT HOLD PJSM MU THE SLIDING SLEEVE BHA .AND PUMP 1-3 LWP'S 17:10 - 18:05 0.92 DRILL C WEXIT I MU THE LWP BHA WITH THE SLIDING SLEEVE 18:05 - 19:30 • 1.42 DRILL C WEXIT i 10 JTS IN THE HOLE,RU THE LWP LAUNCHER AND PUMP AWAY THREE DARTS LOAD DART#1 NEW RIBBED LWP ZERO PUMP TOTALS,PUMP IS CAVITATING SO NO DEFINITIVE PRESSURE SEEN. • LOAD DART#2 CONTROL T(UNMODIFIED) FROM PREVIOUS TEST ZERO PUMP TOTALS AND SEE SLIGHT PRESSURE SPIKE WITH 0.7 AND 1.3BBLS PUMPED AWAY LOAD DART#3 CONTROL N(UNMODIFIED) FROM PREVIOUS TEST ZERO PUMP TOTALS AND SEE SLIGHT PRESSURE SPIKE WITH 0.7 AND 1.3BBLS 1 PUMPED AWAY 19:30 - 21:30 2.00 DRILL C WEXIT HOLD PJSM.LAY DOWN 10 JOINTS AND SLIDING SLEEVE&CATCHER SUB. NOTICE THAT SLIDING SLEEVE HAD BEEN OPENED UP. 21:30 - 00:00 2.50 DRILL N SFAL WEXIT HOLD PJSM WITH CH2-CREW.ESTABLISH BARRIERS FOR BREAKING CONTAINMENT SO WELL SUPPORT CREW CAN REMOVE BLIND FLANGE FROM FWV.SUCCESSFULLY PRESSURE-TEST HARDLINE. HOLD PJSM,DISCUSS LIFT PLAN AND COMMENCE LIFTING CENTRIFUGE ROTATING EQUIPMENT ONTO RIGFLOOR AND FROM THERE TAIL CENTRIFUGE INTO PITROOM IN SIMOPS TO CH2-WORK SCOPE. Printed 1/21/2014 9:26:41AM • North America-ALASKA-BP Page 8-e44 Operation Summary Report Common Well Name:W-18 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:1/9/2014 End Date: X3-013T7-C:(3,605,065.00) Project:Prudhoe Bay Site:PB W Pad Rig Name/No.:NORDIC 1 Spud Date/Time:11/12/1988 12:00:00AM Rig Release: Rig Contractor:NORDIC CALISTA UWI:500292188000 Active datum:Kelly Bushing/Rotary Table @82.00usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 1/14/2014 00:00 - 01:00 1.00 DRILL P WEXIT OPEN UP WELL AGAINST CLOSED CHOKE- OPSI WHP. BACK IN TRUCKS WITH 9.2PPG USED MUD AND START LOWERING FLUID LEVEL IN PREPARATION OF MUD SWAP. RE-INSTALL STAIRS ON THE OUTSIDE. 01:00 - 04:15 3.25 DRILL P WEXIT HOLD PJSM FOR MU PILOT HOLE-MILLING BHA.MU BHA WITH 2.74"D-331 PARABOLIC MILL-2.74"STRING REAMER-X-TREME M1XP(0.93 AKO)-BAKER COILTRAK.STAB ON INJECTOR AND PRESSURE-TEST QTS. UNSTAB INJECTOR,REMOVE STRING REAMER FROM BHA.RESTAB INJECTOR, PRESSURE-TEST QTS AND RIH.I have 04:15 - 06:30 2.25 DRILL P WEXIT RIH WITH BHA#3 AT MINIMUM RATE. TOP TOC AT 8,799'PUMPING AT MINIMUM RATE. 06:30 - 07:20 0.83 DRILL P WEXIT PU AND RETAG.TAG UP PUMPING AT 1.5BPM AT 8,798'. PUH AND LOG TIE IN AND PREP PITS FOR MUD SWAP 07:20 - 07:30 0.17 DRILL P WEXIT CORRECT DEPTH+5' PITS ARE ALMOST READY FOR MUD SWAP, RIH TO TAG TAGGED AT 8804.4'CLOSE TO WHERE WE LEFT OFF 07:30 - 09:10 1.67 DRILL P WEXIT PUMP 20 BBL PILL OUT OF PILL PIT,SWAP TO DEEP CLEAN PILL,SWAP TO 15 BBLS OF FRESH WATER THEN SWAP TO USED 9.2 POWER VIS 09:10 - 09:45 0.58 DRILL P WEXIT 9.2 MUD BACK TO SURFACE,SHUT DOWN THE PUMP,CLOSE THE EDC AND START MILLING THE PILOT HOLE 09:45 - 10:15 0.50 DRILL P WEXIT ON BOTTOM MILLING CMT PILOT HOLE FREE SPIN=2700 PSI AT 1.65 BPM RATE IN=1.50 BPM RATE OUT=1.52 BPM ROP=30-50 FPH WOB=1.15-1.88 K CIRC PSI=4124 PSI MW IN=9.26 PPG MW OUT=9.17 PPG ECD =10.83 PPG IAP=366 PSI OAP=0 PSI PVT=167 BBLS BUT STILL FILLING THE PITS 10:09 8816'STALL 10:15 - 10:45 0.50 DRILL P WEXIT WENT BACK DOWN AFTER STALL AND FOUND NOTHING,INCREASE ROP TO 10 FPM AND NOTHING PUH TO TOC THEN WENT 20'TO 8835'AND STILL NO HARD BOTTOM PU AND CIRC A BOTTOMS UP WHILE CALLING ODE&ETL COULD NOT REACH ODE,TALKED TO ETL AND TOLD TO CONTINUE ON UNTIL WE FIND HARD CMT WILL CONTINUE DOWN ONCE WE SEE A BOTTOMS UP 10:45 - 10:55 0.17 DRILL P WEXIT GREEN CMT COMING ACROSS AND BLINDING OFF THE SHAKER SCREENS CONTINUE RIH UNTIL WE FIND HARD CMT, TAKING 50'BITES(<2 BBLS)WITH PU'S IN BETWEEN Printed 1/21/2014 9:26:41AM • • North America-ALASKA-BP Page 9 e1e2.t Operation Summary Report Common Well Name:W-18 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:1/9/2014 End Date 'X3-013T7-C:(3,605,065.00) Project Prudhoe Bay Site:PB W Pad Rig Name/No.:NORDIC 1 Spud Dateffime:11/12/1988 12:00:00AM Rig Release: Rig Contractor:NORDIC CALISTA UWI:500292188000 Active datum:Kelly Bushing/Rotary Table @82.00usft(above Mean Sea Level) Date From-To Hrs I Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) _ 10:55 - 12:20 1.42 DRILL P WEXIT STARTING TO TO SEE A LITTLE MOTOR WORK AND WOB INCREASE 8845 ROP=90 FPH -800 WOB -100 PSI MOTOR WORK 8856 ROP=50 FPH -950 WOB -200 PSI MOTOR WORK LOOKS LIKE WE ARE MILLING THROUGH PUDDY CALL DRLG SUPT AND DISCUSS WETHER OR NOT TO CONTINUE MILLING 'WHILE THE WSL'S ARE CHANGING OUT OR STOP OPS UNTIL THE NEW WSL ARRIVES. SUPT WANTS THE NIGHT WSL TO COME OUT AND WATCH THE RIG TO CONTINUE MOVING FORWARD. 12:20 - 15:00 2.67 DRILL P WEXIT NIGHT WSL ON LOCATION.GO BACK TO BOTTOM OF 8,856 ND CONTINUE MILLING CEMENT.TOOLFACE=20DEG ROHS, FREESPIN=3,600PSI 8,856'-26FT/HR-IN-MM 1.57BPM/OUT-MM 1.59BPM,CIRC P 3,739PSI/230PSI MOTORWORK,PVT 308BBLS 8,860'-15FT/HR-IN-MM 1.58BPM/OUT-MM 1.60BPM,CIRC P 3,915PS1 - COMPETENT CEMENT? 8,862'-SFT/HR-IN-MM 1.59BPM/OUT-MM 1.62BPM,CIRC P 3,860PSI 8,865'-33FT/HR-CIRC P 3,845PSI 8,873'-36FT/HR-CIRC P 3,860PSI 8,877'-40FT/HR-CIRC P 3,860PSI-WOB= 1.0K LBS PICK UP.SEE PUW=23K LBS.PICK UP TO 8,749'-NO ISSUES,NO OVERPULLS. 8,884'-32FT/HR-CIRC P 3,816PSI-WOB= 0.8K LBS NOTICE A HIGH AMOUNT OF METAL COMING BACK OVER THE SHAKER 8,887'-29FT/HR-CIRC P 3,812PSI-WOB= 1.3K LBS 8,891'-27FT/HR-CIRC P 3,823PSI-WOB= 1.5K LBS 8,894'-29FT/HR-CIRC P 3,860PSI-WOB= 1.54K LBS 8,899'-26FT/HR-CIRC P 3,940PSI-WOB= 1.41K LBS 8,902'-26FT/HR-CIRC P 3,882PSI-WOB= 0.92K LBS PUMP 10BBLS HI-VIS PILL 8,909'-26FT/HR-CIRC P 3,885PSI-WOB= 1.01K LBS Printed 1/21/2014 9.26.41AM • North America-ALASKA-BP Page 10 of?2,1" Operation Summary Report Common Well Name:W-18 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:1/9/2014 End Date. X3-013T7-C:(3,605,065.00) Project:Prudhoe Bay Site:PB W Pad Rig Name/No.:NORDIC 1 Spud Date/Time:11/12/1988 12:00:00AM Rig Release: Rig Contractor:NORDIC CALISTA UWI:500292188000 Active datum:Kelly Bushing/Rotary Table©82.00usft(above Mean Sea Level) Date From-To Hrs Task Code I NPT NPT Depth Phase Description of Operations (hr) (usft) 15:00 - 18:00 3.00 DRILL P WEXIT 8,916'-16FT/HR-CIRC P 4,127PSI-WOB= 2.98K LBS WHEN PILL COMES BACK TO SURFACE,CANNOT SEE ANY INCREASE IN CUTTINGS.DO NOT SEE ANY METAL COMING BACK AT ALL. 8,919'-13FT/HR-CIRC P 3,900PSI-WOB= 1,21K LBS • 8,926'-12FT/HR-CIRC P 3,915PSI-WOB= 1.22K LBS 8,929'-14FT/HR-CIRC P 3,911 PSI-WOB= 1.26K LBS 8,933'-15FT/HR-CIRC P 3,950PSI-WOB= 1.34K LBS 8,938'-27FT/HR-CIRC P 4,040PSI-WOB= 1.88K LBS 8,945'-16FT/HR-CIRC P 3,999PSI-WOB= 1.51K LBS 18:00 - 20:00 2.00 DRILL P WEXIT PUMP HI-VIS PILLAND CONDUCT SHORT WIPER TRIP. ON RUN BACK DOWN,PUMP PRESSURE AND WOB INCREASE AT 8780', INDICATING ENTERING INTO TOP OF COMPETENT CEMENT OF PILOT HOLE. CONTINUE DOWN WITH STEADY PARAMETERS. CONTINUE WITH MILLING OPERATIONS AT 1.55 BPM AND VARYING WOB. 8965'-3915 PSI,1.2K WOB,16 FPH -8970'-3845 PSI,1.25K WOB,15 FPH -8975'-3860 PSI,1.33K WOB,17 FPH -8980'-3900 PSI,1.5K WOB,19 FPH -8995'-3940 PSI,1.6K WOB,20 FPH -MW IN 9.5 PPG,MW OUT 9.1 PPG,NO CHANGE IN PVT. STEADY FLOW OF FINE CEMENT RETURNS ACROSS SHAKER. PUMP 10 BBL HI-VIS SWEEP TO COINCIDE WITH SHORT WIPER TRIP. 20:00 - 21:00 1.00 DRILL P WEXIT SWEEP OUT OF BIT AND BEING CIRCULATED OUT WHILE CONDUCTING SHORT WIPER TRIP. NO SIGNIFICANT INCREASE IN AMOUNT OF RETURNS YET SOME LARGER SIZES OF CEMENT CUTTINGS COMING ACROSS. COMPLETE WIPER BACK DOWN WITH NO ISSUES. 21:00 - 23:00 2.00 DRILL P WEXIT FREE SPIN OF 3875 PSI AT 1.6 BPM. TAG ON DEPTH OF 9000'. -9005'-4170 PSI,1.6K WOB,34 FPH 9015'-4200 PSI,1.95K WOB,35 FPH -9025'-4100 PSI,1.4K WOB,25 FPH 9035'-4125 PSI,1.4K WOB,25 FPH -9045'-4110 PSI,1.5K WOB,25 FPH -MW IN 9.25 PPG,MW OUT 9.1 PPG,NO CHANGE IN PVT. PUMP HI-VIS SWEEP DOWN TO BIT. 23:00 - 23:40 0.67 DRILL P WEXIT PUMP SWEEP AROUND AND CONDUCT SHORT WIPER TO CHASE OUT OF HOLE. FREESPIN=3,940PSI. 23:40 - 00:00 0.33 DRILL P WEXIT CONTINUE MILLING CEMENT -9060'-4,149 PSI,1.28K WOB,20 FPH 1/15/2014 00:00 - 01:45 1.75 DRILL P I WEXIT CONTINUE MILLING CEMENT PILOT HOLE -9067'-4127 PSI,1.47K WOB,29 FPH -9080'-4113 PSI,1.43 WOB,29 FPH -9096'-4150 PSI,1.17 WOB,23 FPH Printed 1/21/2014 9:26.41AM • North America-ALASKA-BP Page 11 21 Operation Summary Report Common Well Name:W-18 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:1/9/2014 End Date: X3-013T7-C:(3,605,065.00) Project:Prudhoe Bay Site:PB W Pad Rig Name/No.:NORDIC 1 Spud Date/Time:11/12/1988 12:00:00AM Rig Release: Rig Contractor.NORDIC CALISTA UWI 500292188000 Active datum:Kelly Bushing/Rotary Table @82.00usft(above Mean Sea Level) Date From-To ! Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) _ (usft) 01:45 - 02:300.75 i DRILL P WEXIT PERFORM WIPER WHILE PUMPING HI VIS PILL. 02:30 04:00 1.50 DRILL P WEXIT CONTINUE MILLING CEMENT PILOT HOLE -9109'-4000 PSI,0.89K WOB,14 FPH -9118'-4110 PSI,1.47K WOB,23 FPH -9128'-4153 PSI,1.46K WOB,23 FPH 04:00 - 04:45 0.75 DRILL P WEXIT PERFORM WIPER WHILE PUMPING HI VIS PILL.NOTICE AN INCREASE IN SMALL CEMENT PIECES ACROSS SHAKERS. 04:45 - 05:25 0.67 DRILL P WEXIT I LOG TIE IN AT 8480'(TOP OF JB MARKER). APPLY+1'DEPTH CORRECTION. 05:25 - 06:30 1.08 DRILL P WEXIT DRY DRIFT FROM 8543'TO 9130'. RIH AT 10 FPM WHILE CIRCULATING AT 0.47 BPM W/1593 PSI. -8804'-INCREASE IN CIRCULATING PRESSURE AND WOB=0.34K.TOC#1. -8843'-OBSERVE WOB INCREASE TO 1.7K AND INCREASE IN CIRCULATING PRESSURE. TOC#2. PU TO 8792'AND SHUT DOWN PUMPS. RIH AT 11.5 FPM.TAG AT 8842'.WORK STRING FOUR TIMES TO ENTER HOLE.RIH TO BOTTOM AT 9130'. 06:30 - 07:00 0.50 DRILL P WEXIT POH AND REAM FROM 9130'TO 8770'. 07:00 - 08:30 1.50 DRILL P WEXIT CONDUCT DRY DRIFT PASSES IN ATTEMPT TO CLEAN THE HOLE PRIOR TO POOH. -RIH FROM 8770'TO 9130'AT 6 FPM. TAGGED AT 8842',8848',AND 8873' WORK STRING IN ORDER TO CLEAN SECTIONS AND CONTINUE TO RIH. PUMP 2OBBL HI VIS PILL. 08:30 - 11:00 2.50 DRILL � P WEXIT POOH AND CHASE 20 BBL PILL FROM 9130' TO SURFACE. NO ISSUES COMING OUT OF HOLE. SLIGHT INCREASE IN LARGER CUTTINGS WITH RETURN OF SWEEP BUT VOLUME THE SAME. SHAKER PRETTY CLEAN WITH TRIP OUT. 11:00 - 12:45 1.75 EVAL I P WEXIT POP OFF,LD BHA. MILL GAUGE AT 2.74"GO, 2.73"NO-GO. PJSM ON LAYING DOWN BHA AND PICKING UP CALIPER/DUMMY WHIPSTOCK BHA. MAKE UP BHA PER RUNNING ORDER: MAKE UP SETTING TOOL AND WHIPSTOCK DRIFT BAR TO COILTRAK TOOLS. ASSEMBLE CALIPER BHA TO DRIFT ASSEMBLY,FUNCTION TEST ARMS. GOOD TEST. MAKE UP TO COIL CONNECTOR,STAB ON,PRESSURE TEST QUICK TEST SUB. 12:45 - 14:30 1.75 EVAL P WEXIT RIH WITH CALIPER AND DRIFT ASSEMBLY TO 8500' 14:30 - 14:55 0.42 EVAL P WEXIT LOG FOR TIE-IN FROM 8500'WITH+3' CORRECTION. 14:55 - 16:15 1.33 EVAL P WEXIT SLOWLY RIH WITH ASSEMBLY TO CURRENT TD OF 9130',NO ISSUES PASSING THROUGH PILOT HOLE. PARK AT 9129'AND WAIT FOR TIMER TO COMPLETE CYCLE TO OPEN CALIPER ARMS AND BEGIN LOGGING. 16:15 - 18:00 1 75 EVAL P WEXIT LOG UP WITH CALIPER ASSEMBLY AT 55 FPM. COMPLETE LOGGING UP TO 8,200'.POOH. Printed 1/21/2014 926:41AM • North America-ALASKA-BP Page 12.224 Operation Summary Report Common Well Name:W-18 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:1/9/2014 End Date: X3-013T7-C:(3,605,065.00) Project:Prudhoe Bay Site:PB W Pad Rig Name/No.:NORDIC 1 Spud Date/Time:11/12/1988 12:00:00AM Rig Release: Rig Contractor.NORDIC CALISTA UWI:500292188000 Active datum:Kelly Bushing/Rotary Table©82.00usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 18:00 - 19:20 1.33 EVAL P WEXIT HOLD PJSM.UNSTAB INJECTOR AND LD BHA #5. LOAD OUT PDS CALIPERTOOL AND DOWNLOAD DATA. 19:20 - 20:00 0.67 STWHIP P WEXIT PREPARE TO MU BHA#6.LOAD BAKER WHISTPOCK INTO PIPESHED. ;20:00 - 20:30 0.50 STWHIP P WEXIT HOLD PJSM,THEN MU BHA INCLUDING 3-1/2" MONO-BORE WHIPSTOCK-SETTING SLEEVE -#10 J-HYDR SETTING TOOL-FVS- COILTRAK-TOOLS(AKO=0.6). 20:30 - 20:50 0.33 EVAL P WEXIT STAB ON AND PRESSURE-TEST QTS TO 300PSI/5MINS AND 3,500PSI/5MINS. MEANWHILE EVALUATE 3D CALIPER-DATA BETWEEN 9,030'-9,130'.DECIDE TO MOVE TOP OF WHIPSTOCK UPWARDS BY 10'-NEW WHIPSTOCK SETTING DEPTH IS 9,070'. 20:50 - 22:50 2.00 STWHIP P WEXIT COMMENCE RIH WITH BHA#6(EDC OPEN). 22:50 - 00:00 1.17 STWHIP P WEXIT RIH TO 8,500'AND WAIT FOR FINAL INTERPRETATION OF THE CALIPER DATA FROM PDS. 1/16/2014 00:00 - 01:45 1.75 EVAL P WEXIT RECEIVE CALIPER-REPORTS FROM PDS. EVALUATE DATA AND AGREE WITH ODE ON WAY FORWARD.AGREE TO SET WHIPSTOCK AT 15DEG LOHS. 01:45 - 02:33 0.80 STWHIP P WEXIT RIH TO 8,870'AND OPEN EDC.CONTINUE RIH AND RUN PAST TOC(8,804'AND 8,842') W/OUT ANY ISSUES. 02:33 - 03:20 0.78 STWHIP P WEXIT PERFORM TIE-IN LOG.LOG DOWN AND APPLY A-5.5'DEPTH CORRECTION 03:20 - 03:30 0.17 STWHIP P WEXIT CONTINUE TO RIH WITH 3-1/2"MONOBORE • WHIPSTOCK POSITION COIL AT 9,078.75'(BIT-DEPTH) WHICH PLACES TOP OF WHIPSTOCK AT 9,070'(WHIPSTOCK LENGTH:8.75').CONFIRM WHIPSTOCK ORIENTATION IS 15°LOHS (345°DEG). PICK UP TO BRING COIL IN TENSION,CLOSE EDC AND START PUMPS.OBSERVE PRESSURE-DROP AT 3,950PSI CIRC PRESSURE.SLACK OFF-3K LBS CT WEIGHT ON WHIPSTOCK TO CONFIRM WHIPSTOCK IS PROPERLY SET-CANNOT OBSERVE ANY MOVEMENT. 03:30 - 05:30 2.00 STWHIP P WEXIT PU,OPEN EDC,BRING ON PUMPS AND POOH. 05:30 - 06:00 0.50 STWHIP P WEXIT PULL TO 200'AND FLOVVCHECK WELL FOR 5 j MINS.ACHIEVE GOOD NO FLOW,PULL TO SURFACE. UNSTAB INJECTOR,LD BHA#6. 06:00 - 09:45 3.75 STWHIP P WEXIT CONDUCT COIL MANAGEMENT AFTER FIFTH RUN THROUGH CHROME TUBING. CUT OFF COIL TUBING CONNECTOR. BREAK OFF •LUBRICATOR,MAKE UP COIL CUTTER. CUT 100'OF COILAND E-LINE. BREAK OFF COIL CUTTER,MAKE UP LUBRICATOR BACK TO INJECTOR AND PRESSURE TEST CONNECTION. GOOD TEST. MU CTC&PULL TEST TO 40KLBS.PRESSURE TEST CTC TO 3800 PSI.GOOD TEST. MEG TEST ELINE- GOOD TEST. MU UQC SUB. Printed 1/21/2014 9:26:41AM • North America-ALASKA-BP Page 130 4 Operation Summary Report Common Well Name:W-18 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:1/9/2014 End Date: X3-013T7-C:(3,605,065.00) Project:Prudhoe Bay Site:PB W Pad Rig Name/No.:NORDIC 1 Spud Date/Time:11/12/1988 12:00:00AM Rig Release: Rig Contractor:NORDIC CALISTA UWI:500292188000 Active datum:Kelly Bushing/Rotary Table t82.00usft(above Mean Sea Level) Date From-To -Hrs Task Code NPT NPT Depth Phase Description of Operations (hr)_ (usft) 09:45 - 10:45 1.00 STWHIP P WEXIT PJSM ON MAKING UP MILLING BHA. MU BHA: 2.74"WINDOW MILL(2.74"GO,2.73"NO-GO), STRING MILL,EXTREME MOTOR WITH.6° AKO(3.8°BEND),WORK STRING,FLOAT VALVE SUB,BAKER INTECK COILTRAK TOOLS. MU TO COIL,STAB ON WITH INJECTOR,PRESSURE TEST QUICK TEST SUB. 10:45 - 12:15 1.50 STWHIP P WEXIT RIH WITH BHA WITH NO ISSUES 12:15 - 12:45 0.50 STWHIP P WEXIT LOG TIE-IN WITH-6'CORRECTION. 12:45 - 13:15 0.50 STWHIP P WEXIT RIH AND DRY TAG AT 9072'. PICKUP, RECORD SLOW PUMP RATES. MOVE BACK DOWN SLOWLY AND RE-TAG AT 9071'WHILE PUMPING AT 1.5 BPM,3950 PSI. 13:15 - 16:00 2.75 STWHIP P WEXIT BEGIN MILLING OPERATIONS. FREE SPIN 1.5 QLD I. BPM,3850 PSI. MW tN 9.28 PPG,MW OUT ✓� T 9.21 PPG. -PICK UP WHILE CIRCULATING AND SLOWLY SET BACK DOWN TO INITIATE MILLING SEQUENCE. TAG AGAIN AT 9071'. -INITIAL MILLING RATE OF 1.5 BPM,3950 PSI, 1K WOB -CONTINUE WITH MILLING PER BAKER REP. I WOB AND DIFFERENTIAL PRESSURE DROPPED OFF AT 9074.1'. CONTINUE WITH MILLING AT.5-.6K WOB AND 3780 PSI AT 1.5 BPM. MILLTO 9075'. CHECK MAGNETS AND SHAKER,SIGNIFICANT METAL ON BOTH. 16:00 - 17:30 1.50 STWHIP P WEXIT CALL BAKER THRU TUBING SUPERVISOR TO DISCUSS ISSUE. POSSIBILITY THAT MILL HAS ALREADY NOSED OUT OF TUBING WITH A BENT MOTOR ON THE ASSEMBLY. DEPTH TO CENTER POINT FROM PINCH POINT OF 9071'SUPPORTS THIS. -MOVE DOWN TO MILL AT 9075.1'AND WOB I INCREASED FROM.4K TO.7K BUT DROPPED OFF FAIRLY RAPIDLY. DROPPED FROM.7K WOB TO.5K WOB WITHIN 3 MINUTES. -MOVE TO 9075.2'AND.72K WOB,3740 PSI. -MOVE TO 9075.3'WMTH.92K WOB,3755 PSI. -MOVE DOWN ANOTHER TENTH,WOB INCREASED TO 1.1K WITH 3710 PSI. STILL OBSERVING A LOT OF METAL ACROSS SHAKER. -MOVE TO 9075.5'WITH 1.4K AND 9705 PSI. -WOB NOW STAYING CONSISTENT AT.9-1.4K • WITH CIRCULATING PRESSURE AT 3700-3840 PSI RANGE. CONTINUE WITH MILLING PER BAKER REP. -MW IN 9.27PPG,MWOUT9.22PPG Printed 1/21/2014 9:26:41 AM North America-ALASKA-BP Page 14 Operation Summary Report Common Well Name:W-18 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:1/9/2014 End Date: 1X3-013T7-C:(3,605,065.00) Project:Prudhoe Bay Site:PB W Pad Rig Name/No.:NORDIC 1 Spud Date/Time:11/12/1988 12:00:00AM Rig Release: Rig Contractor:NORDIC CALISTA UVI:500292188000 Active datum:Kelly Bushing/Rotary Table @82.00usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 17:30 - 18:30 1.00 STWHIP P WEXIT SET DOWN FOR ANOTHER TENTH AT 9076' AND WOB DROPPED OFF QUICKLY YET PRESSURE STILL AT 3880 PSI. METAL STILL COMING ACROSS SHAKER. WOB DROPPED, CIRCULATING PRESSURE DROPPED,AND COIL WEIGHT INCREASED AT 9076.3'. AS COIL IS MOVED IN ATTEMPT TO GAIN •ANOTHER TENTH,WOB STILL AT OK AND CIRCULATION PRESSURE DROPPED TO 3790 PSI. -MILL OUT OF WINDOW AT 9076'. CONTINUE WITH MILLING PER PROGRAM TO ALLOW STRING REAMER TO CLEAN WINDOW AND MILL TO ENTER INTO NEW FORMATION. -TAKE SAMPLE AT 9,076',GEO DOES NOT OBSERVE ANY FORMATION. 18:30 - 19:50 1.33 STWHIP P WEXIT CONTINUE MILLING OPERATION 9,081.7'-3,760PSI CIRC P-1.84K LBS WOB- 5FT/HR-1.51 BPM/0.152BPM-9.27PPG/ 9.20PPG TAKE FURTHER SAMPLE AT 9,081'.GEO REPORTS SMALL TRACE OF FORMATION. 9,08T-3,760PSI CIRC P-1.84K LBS WOB- 5FT/HR-1.51 BPM/1.52BPM-9.27PPG/ 9.20PPG 9,086'-3,760PSI CIRC P-2.00K LBS WOB- 5FT/HR-1.51 BPM/1.52BPM-9.27PPG/ 9.21 PPG 19:50 - 22:20 2.50 STWHIP P WEXIT COMPLETE MILLING 10'RATHOLE TO 9,087'. TAKE SAMPLE(GEO REPORTS FORMATION) AND PERFORM 3X UP/DOWN PASSES BETWEEN 9,087'AND 9,068'AT 0.5FT/MIN.ALL PASSES ARE LOOKING CLEAN.PU TO 9058', SHUT IN PUMPS AND DRYDRIFT WINDOW- NO ISSUES. 22:20 - 22:40 0.33 STWHIP P WEXIT PUMP 15BBLS HI-VIS PILL,THEN PULL ABOVE WINDOW AND FLOWCHECK WELL BEFORE POOH.ACHIEVE GOOD NO FLOW. 22:40 - 00:00 1.33 STWHIP P WEXIT START POOH. 1/17/2014 00:00 - 00:20 0.33 STWHIP P WEXIT CONTINUE POOH TO 200'. 00:20 - 00:45 0.42 STWHIP P WEXIT FLOWCHECKAND CLOSE EDC.ACHIEVE GOOD NO FLOW,PULL BHA TO SURFACE. 00:45 - 01:30 0.75 STWHIP P WEXIT HOLD PJSM.UNSTAB INJECTOR,BLOW DOWN COILTRAK-LOGGING TOOLS AND LD BHA#7. GAUGE MILL:2.73"GO/2.72"NO-GO, REAMER:2.74"GO/2.73"NO-GO. 01:30 - 04:00 2.50 EVAL N WEXIT PROCEED TO CHECK WHETHER TREE BOLTS ARE SUFFICIENTLY TORQUED UP,BUT INDENTIFYA SERIES OF LOOSE TREE BOLTS INCLUDING THE LOWER FLANGE OF THE MV. CALL OUT DSM TO RETIGHTEN BOLTS AND PRESSURE-TEST TREE. WAIT FOR DSM-CREW TO ARRIVE ON LOCATION. Printed 1/21/2014 9.26:41AM TREE= 4-1/16"CNV 4'VELL-EAD= MCEVOY VV-18 SAF. NOTES:'**3-1/2"CHROME TBG*** ACTUATOR= BAKER C NITIAL KB.ELE 82' _ — 2133' —3-1/2"HES X NP,ID=2.813" BF.ELEV ------------ KOP= 5177' 20"CONDUCTOR ? Max Angle= 29'@ 6195' GAS LIFT MANDRELS Datum MD= 9208' ST MD I�i 1, DEV TYPE VLV LATCH PORT DATE Datum TVD= 8800'SS , 5 3192 3192 0 MMG DMY RK 0 11/29/13 4 5109 5109 8 MMG DMY RK 0 11/19/13 13-3/8"CSG,72#,L-80 BTRS,D=12-347" —{ 2663' x 3 6181 6108 30 MMG DMY RK 0 11/19/13 / 2 7286 7103 23 MMG DMY RK 0 11/19/13 3-1/2"TBG,9.2#,13CR-85 JFE BEAR —i 4682' 1 8261 7996 24 MMG DMY RK 0 11/19/13 XO TO 13CR-85 VAM TOP 8482' H 3-1/2"HES X NP,D=2.813" Minimum ID =2.750" @ 8629' 3-1/2" HES X NIPPLE �� 8508' I-9-5/8"X3-1/2"HES TNT PKR,ID=2-949" 8543' —13-1/2"HES X NP,D=2-813" 3-1/2"TBG,9.2#,13CR 85 VAM TOP, H 8601' 0087 bpf,D=2-992" 8616' H 9-5/8"X 3-1/2"UNIQUE OVERSHOT 8629' H3-1/2"HES X NP,D=2-750" 3-1/2 TBG STUB(06/26/13) H 8604' 8638' I—9-5/8"X 4-1/2"BKR SAB-3 PKR,D=3-875" 8660' —3-1/2"I-ES X NP,D=2.750" 3-1/2"TBG STUB(07/04/00) H -'8671 TOP OF 7"LNR —{ 8736' 8688' 1—3-1/2"BKR SEAL ASSY W/O SEALS,ID=3-001" 3-1/2"TBG,9.2#,L-80,.0087 bpf,D=2.992" H 8765' =� 8684' }-9-5/8"X 4-1/2"BKR SAB-3 PKR,D=3.99" 9-5/8"CSG,47#,NT-80S BUTT XO TO NSCC —1 8846' -1 8732' I—3-1/2"SWS NP,D=2.750" 9-5/8"CSG,47#,NT-80S,D=8-681" --I 9003' I ■ 8753' H3-1/2"SWS NP,D=2.750" PERFORATION SUMMARY 8765' WD 3-1/2" LEG, =2-992" REF LOG: BHC-GR ON 11/25/88 .1 8770' —DMD TT LOGGED 03/11/93 ANGLE AT TOP PERF:18`@9161' x .4 l 8795' H TOP OF CEMENT(01/12/14) Note:Refer to Production DB for historical pert data II 8809' J TOC(12/11/13) SIZE SPF INTERVAL Opn/Sqz SHOT SQZ .•ii 2" 6 9161-9171 S 06/20/09 12/11/13 , ,,ti 8989' F-7"MARKER JOINT 2" 6 9176-9181 S 06/20/09 12/11/13 9070' 1—W-FSTOCK(01/16/14) 2" 6 9188-9198 S 06/20/09 12/11/13 2-1/2" 6 9210-9230 S 08/08/03 12/11/13 2-1/2" 6 9225-9260 S 09/03/96 12/11/13 5" 4 9268-9288 S 08/02/90 12/11/13 5" 4 9268-9288 S 11/29/88 08/01/90 5" 4 9292-9317 S 08/02/90 12/11/13 Att I 5" 4 9292-9317 S 11/29/88 08/01/90 5" 4 9320-9330 S 08/02/90 12/11/13 —�7"X 3-1/2"OTIS WD PKR D= ? 5" 4 9320-9330 S 11/29/88 08/01/90 �� F&� 5" 4 9339-9344 S 08/02/90 12/11/13 9362' FISH-(2)4"X 2-5"PKR RUBBER 5" 4 9339-9344 S 11/29/88 08/01/90 n 9362' H 3-1/2"OTIS X NP,D=2.750" 5" 4 9344-9350 S 08/02/90 12/11/13 5" 4 9359-9364 S 11/29/88 08/01/90 9362' I—3-1/2^XX PLUG SET 5" 4 9374-9384 - 08/02/90 I 9363' I—3-1/2"PARKER WLEG,ID=2.992" 5" 12 9405-9410 S 07/31/90 08/01/90 9396' H 7"CBvIBVT RETAINER 3-1/2"TBG,9-3#,L-80,.0087 bpf,ID=2.992" H 9363' PBTD H 9432' 7"LNR,26#,L-80 U4S,.0383 bpf,D=6276" — 9550' �41 ..�.j.1./ DATE REV BY COMMENTS DATE REV BY CO v?&NTS PRUDHOE BAY UNIT 11/28/88 SA IMTIAL COMPLETION 12/23/13 JMdJMD MLLED CBPS/SOZ CMT(12/11/1 WELL: W-18 08/05/90 0-16 RWO 12/23/13 JMD GLV GO CORRECTIONS PEfRMf Nb:'1881280 07/14/00 N4ES RWO 12/27/13 JCF/JMD P&A TOP OF CENB'Tf(12/19/13) API No: 50-029-21880-00 11/21/13 PKR 273 RWO 02/05/14 JNJJMD ADD WI-PSTOCK/CORRECT)ONS SEC 21,T11N,R12E,731'FTP&1182'FEL 12/02/13 DAJ/PJC ODE FINAL APPROVAL 12/02/13 WEC/PJC GLV C/O(11/29/13) BP Fcploration(Alaska) • STATE OF ALASKA RECEIVED AL,.„KA OIL AND GAS CONSERVATION CO. SSION REPORT OF SUNDRY WELL OPERATIONS DEC 1 7 2013 1. Operations Performed: AOGCC ❑Abandon ❑Repair Well ❑Plug Perforations ❑Perforate ❑Re-Enter Suspended Well ❑Alter Casing ®Pull Tubing • ❑Stimulate-Frac ❑Waiver ❑Other ❑Change Approved Program ❑Operation Shutdown ❑Stimulate-Other ❑Time Extension 2. Operator Name: 4. Well Class Before Work: 5. Permit To Drill Number: BP Exploration(Alaska) Inc. ❑Exploratory ❑Stratigraphic 188-128 . 3. Address: 0 Development ❑Service 6. API Numbe P.O. Box 196612,Anchorage,Alaska 99519-6612 50-029-21880-00-00 ' 7. Property Designation(Lease Number): 8. Well Name and Number: ADL 028263 • PBU W-18 - 9. Logs(list logs and submit electronic and printed data per 20AAC25.071): 10.Field/Pool(s): Prudhoe Bay/Prudhoe Bay . 11. Present well condition summary: Total depth: measured 9550' feet Plugs:(measured) 8655',8739',9362' feet true vertical 9206' feet Junk:(measured) 9362' feet Effective depth: measured 9432' feet Packer: (measured) 8508',8638,8684',9353' feet true vertical 9094' feet Packer: (true vertical) 8223,8344',8386',9019' feet Casing Length Size MD TVD Burst Collapse Structural Conductor 80' 20” 30'- 110' 30'- 110' Surface 2634' 13-3/8" 29'-2663' 29'-2663' 4930 2270 Intermediate 8975' 9-5/8" 28'-9003' 28'-8687' 6870 4760 Production Liner 814' 7" 8736'-9550' 8435'-9206' 7240 5410 Perforation Depth: Measured Depth: 9161'-9384' feet True Vertical Depth: 8837'-9049' feet - Tubing(size,grade,measured and true vertical depth): 3-1/2",9.2#x 9.3# 13Cr85/L-80 8765',9353' 8463', 9019' 9363' 9029' 9-5/8"x 3-1/2"HES TNT Packer 8508'/8223 Packers and SSSV(type,measured and true vertical depth): 9-5/8"x 4-1/2"Baker S-3 Packer 8638'/8344' 9 5/8"x 4-1/2"Baker SAB-3 Packer 8684'/8386' 7"x 3-1/2"Otis WD Packer 9353/9019' 12.Stimulation or cement squeeze summary: Intervals treated(measured): Treatment description including volumes used and final pressure: SCANNED ��P � 3 i i c, 13 Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation: 0 0 0 60 200 Subsequent to operation: 0 0 0 200 0 14.Attachments: ❑Copies of Logs and Surveys run 15.Well Class after work: ❑ Exploratory ❑Stratigraphic' 0 Development ❑Service ®Daily Report of Well Operations ®Well Schematic Diagram 16. Well Status after work: • 0 Oil ❑Gas ❑WDSPL ❑GSTOR ❑WINJ ❑WAG ❑GINJ ❑SUSP ❑SPLUG 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O.Exempt: Contact: Dave Johnson,564-4171 Email: David.A.Johnson @bp.com N/A Printed N- - Joe Lastu jib Title: Drilling Technologist Signature: 1 r ,1 Phone: 564-4091 Date: 12.11(0/15 Form 10-404 Re • 10/2012 V'L !i�/� RB / i;r' t021y0 2� W-18, Well History (Pre Rig Workover) Date Summary 06/19/13 PULLED 3-1/2" PX PLUG @ 8630'SLM/8660' MD. DRIFT TUBING W/2.70"CENT. OUT TT @ 8770 ELMD. LOCATE TT @'SLM/8770' ELMD (35'CORRECTION). RAN SLB SBHPS PER PROGRAM (good data). FLUID LEVEL @ SURFACE. 06/21/13 INITIAL T/I/0= 1000/750/100. LRS LOAD TBG W/170 BBL KCL&25 BBL DIESEL FRZ PROTECT. RIH W/3.5" BKR COMPOSITE PLUG, OD=2.55". 06/22/13 Assist E-line MIT-T FAILED, MIT-IA PASSED to 2500 psi. (Pre RWO) MIT-T: Pumped 29 bbls diesel down Tbg,was unable to maintain test pressure. Established an LLR of 1.2 bpm @ 3400 psi. MIT-IA: Pressured up IA with 6 bbls diesel. IA lost 65 psi in 1st 15 mins and 32 psi in 2nd 15 mins for a total loss of 97 psi in 30 min test. Final WHPs 375/285/65 E-line in control of well at time of departure. 06/22/13 CURRENTLY RIH W/3.5" BKR COMPOSITE PLUG, OD=2.55". UNABLE TO SET PLUG ON 1ST ATTEMPT DUE TO DAMAGED PLUG. RIH W/3.5" BKR COMPOSITE PLUG, OD=2.55". CCL STOP DEPTH =8727.7', CCL TO MID-ELEMENT= 12.3'. PLUG SET AT 8740'MID-ELEMENT. LRS PERFORMED CMIT-TxIA, FAILED, LLR= 1.2 BPM. SUSPECT STACKER PACKER AT 8684' LEAKING. WELL LEFT S/I AND TURNED OVER TO DSO. FINAL T/I/0=25/360/100. 06/22/13 T/I/O=SSV/370/100 Temp=SI PPPOT-T(PASS) PPPOT-IC (PASS) Pre RWO. PPPOT-T: Bled void to 0 psi.with SBS. Removed 1" NPT, installed alamite fitting. Cycled LDS, all moved freely(2.5"). Pumped through void, good returns. Pressured test void to 5000 psi. Lost 150 psi. in 15 min. Lost 50 psi. in second 15 min. (PASS). Bled void to 0 psi. Removed alamite installed 1" NPT plug. Unable to remove internal check due to WHP's. PPPOT-IC: Bled void to 0 psi.with SBS. Removed 1" NPT, installed alamite fitting. Cycled LDS, all moved freely(2.5"). Pumped through void, good returns. Pressured test void to 3500 psi. Lost 100 psi. in 15 min. Lost 0 psi. in second 15 min. (PASS). Bled void to 0 psi. Removed alamite installed 1" NPT plug. Unable to remove internal check due to WHP's. 06/23/13 INITIAL T/I/O= 100/480/100. RIH W/GR/CCL/TEMP/PRESS/PILS/SPINNER. LOG BASELINE PASS DOWN TO PLUG AT 8740'. PUMP DOWN TBG W/TRIPLEX. PERFORM STATION LOG ABOVE PLUG, LEAK DETECTED AT PLUG AT 8740'. WELL S/I FOR THE NIGHT AND HANDED OVER TO DSO. 06/24/13 T/I/0=550/480/49 Temp=SI Assist E-line(RWO prep) Pumped 20 bbls diesel down Tbg per E-line. Final WHP 344/422/50. 06/24/13 INITIAL T/I/O =450/480/100 PSI. RIH W/3.5" BKR COMPOSITE PLUG, OD=2.55". SAT DOWN AT 7950', POOH TO INSPECT PLUG. NO DAMAGE TO PLUG, SUSPECT PARAFFIN/ASPHALTENES. LRS PUMPED 20 BBL DIESEL TO FLUSH TBG. RIH W/3.5" BKR COMPOSITE PLUG, OD=2.55". SAT DOWN ABOVE GLM#2 AT 7645', POOH TO INSPECT PLUG. DAMAGE FOUND TO PLUG, R/D FOR S/L TO B&F. WELL LEFT S/I, HAND OVER TO DSO. 06/25/13 /I/0=580/485/42 Assist SSL with brush&flush (RWO prep) Pumped 75 bbls 180*diesel for service. FWHP's=600/500/50 Upon departure SLB on well&in contol of all WHV's. 06/25/13 INITIAL T/I/0=500/500/100 PSI. RIG UP TO RUN BAKER COMPOSITE PLUG. Page 1 of 3 W-18, Well History (Pre Rig Workover) Date Summary 06/26/13 T/I/0=Temp=S/I Assist SEL MIT-T to 3500 psi***FAILED 5 attempts***CMIT-TxIA to 3500 PSI **PASSED**CMIT-TxIA to 1000 PSI after cut**PASSED**MIT-OA to 2000 PSI (RWO prep) Pumped a total of 2.8 bbls diesel for MIT-T. Last test 1st 15 min TBGP lost 246&2nd 15 min lost 176 for a total TBGP loss of 422 in 30 min. Note IAP kept increasing through all tests. See log. Pumped 6.74 bbls diesel for CMIT-TxIA to test. 1st 15 min TxIA lost 173/45&2nd 15 min TxIA lost 45/18 for a total TxIA loss of 218/63 in 30 min. Bled back— 12 bbls. E-line jet cut TBG. Pumped 3.2 bbls for CMIT-TxIA after cut to test. 1st 15 min TxIA lost 18/24&2nd 15 min TxIA lost 15/13 for a total TxIA loss of 33/37 in 30 min. 7th attempt Bled back—3 bbls. 06/26/13 RIH W/BKR 3.5"COMPOSITE BRIDGE PLUG, OD=2.55". CCL STOP DEPTH=8642.7', CCL TO MID ELEMENT=12.3'. COMPOSITE PLUG SET MID-ELEMENT AT 8655'TBG TALLY DEPTH. LRS CMIT- TxIA TO 3500 PSI - PASSED. RIH W/2.50"SCP POWER CUTTER. JET CUT TBG AT 8594'TBG TALLY DEPTH. GOOD INDICATION. HAND WELL OVER TO LRS FOR CMIT-TxIA AND MIT-OA. DSO NOTIFIED. FINAL PRESSURES T/I/0=300/190/100 PSI. 06/27/13 MIT-OA to 2000 psi FAILED (RWO prep) Pumped 30 bbls diesel into OA, Established a LLR of 2bpm @1150 psi Bled OA back psi Final WHP's 480/230/98 SV,WV,SSV,AL=closed. V,IA,OA=open PAD op notified on departure. 07/02/13 T/I/0=517/274/208 Temp=Sl Circ Out/CMIT TxIA to 1000 psi PASSED (RWO CAPITAL) Pumped 5 bbls 50*neat meth&861 bbls 90*Sea Water down TBG,taking returns up IA to W-16 FL,for circ out. Pumped 180 bbls 50*DSL down IA for Freeze Protect. U-Tubed IA to TBG./CMIT TxIA-Pressured up w/ 1.6 bbls 50*DSL. On 3rd test,T/IA Isot 19/18 psi in 1st 15 min& 16/17 psi in 2nd 15 min,for a total loss of 35/35 psi in 30 min. Pass. Bled TxIAP (-2.4 bbls). FWP=0/0/0 Tags hung. SV,WV&SSV=C MV=O IA&OA=OTG. 09/03/13 T/I/0=n/a/80/200 FP FL 10 bbls neat meth FWHP=80/80/200(swab closed,wing closed an tagged,ssv closed master closed and locked,annulus valves open to gauges). 10/11/13 T/I/O=SSV/60/170.Temp=SI. Bleed IAP&OAP to 0 psi (RWO prep).AL SI @ casing valve.ALP=1890 psi. IA&OA FL @ surface. Bled IAP from 60 psi to 0+psi in 30 minutes(fluid, —2.5 gal). Bled OAP from 170 psi to 0+ psi in 2 hrs 30 minutes(fluid, —8 gal). Monitored for 30 minutes. No changes in IA&OA pressures. Final WHP's=SSV/0+/0+. SV,WV, SSV=C. MV=0. IA, OA=OTG. 04:30. 10/13/13 T/I/O=SSV/60/180.Temp=SI.WHP's(post bleed). No wellhousr or flowline. MV is LOTOED. IAP increased 60 psi&OAP increased 180 psi since 10/11/13. SV, WV, SSV, MV=Closed. IA&OA=OTG. NOVP. 10:20. 10/14/13 T/I/O=SSV/60/180. Temp= SI. Bleed WHPs to 0 psi (pre rig). WH &flowline removed. MV= LOTO. IA &OA FLs @ surface. Bled IAP to 0 psi in 30 min, held open bleed for 1 hr(1 bbl). Bled OAP to 0 psi in 15 min and held open bleed for 1 hr(1/2 bbl). monitored for 30 min, OAP increased 25 psi. Final WHPs= SSV/0/25. SV, WV, SSV, MV=C. IA, OA=OTG. NOVP. 04:00 hrs. 10/15/13 T/I/O=50/40/160.Temp=S1. Bleed IA&OA to 0 psi (Pre RWO). WH &flowline removed. IA&OA FL's @ surface. Bled IAP from 40 psi to 0 psi in 25 minutes, held open bleed for 1 hr(.75 Bbl). Bled OAP from 160 psi to 0 psi in 40 minutes, held open bleed for 1 hr(1/2 Bbl). Monitored for 30 minutes. IAP increased 5 psi, OAP increased 8 psi. Final WHP's=50/5/8. SV,WV, SSV=C. MV=0. IA, OA=OTG. 04:45. 10/16/13 T/I/0= 100/50/170.Temp=SI.WHPs(pre rig). Flowline&Wellhouse removed. Pad prep in progress. SV,WV, SSV, MV=C. IA, OA=OTG. NOVP. 20:00 hrs. Page 2 of 3 W-18, Well History (Pre Rig Workover) Date Summary 10/17/13 T/I/O =TWC/40/170.Temp=SI. Bleed IA&OA to 0 psi (Pre RWO). No AL, F/L or wellhouse. Bled the IAP from 40 psi to 0 psi in 10 minutes( .5 bbls,all fluid). Bled the OAP from 170 psi to 0 psi in 10 minutes (.5 bbls, all fluid). Monitored WHP's for 15 minutes, IAP remained unchanged and the OAP increased to 15 psi.TRP crew on location to change out tree upon departure. FWP's=TWC/0/15. SV,WV, SSV= C. MV=0. IA, OA=OTG. NOVP. 2345 hrs. 10/18/13 T/1/0= Unk/50/140.Temp=SI. WHPs(Pre rig). No AL,flowline,wellhouse, scaffold, or floor grating. Dryhole tree only. Unable to access tree cap. Dryhole tree valves=C. IA&OA(Double valves)=OTG. NOVP. 1515 hrs. 10/19/13 T/I/O= Unk/50/160. Temp=SI.WHP's(Pre rig). No AL,flowline,wellhouse, scaffold, or floor grating. OAP increased 20 psi overnight. SV, MV=C. IA, OA=OTG. NOVP. 0930. 10/21/13 T/1/0= Unk/50/160. Temp.=SI.WHPs(Pre Rig). No AL,flowline,well house, plywood for scaffolding around well, cannot get to Tree cap.WHPs unchanged since 10/19/13. SV,MV=C. IA&OA=OTG. NOVP. 1200 hrs. 10/23/13 T/I/0=100/60/160 Temp=SI Load OA(RWO prep) Speared into OA w/5 bbls neat methanol followed by 158 bbls Inhibited 9.8 ppg brine to load. Pumped 6 bbls diesel down OA to cap/freeze protect. FWHP's=160/140/320 SV, MV=SI IA&OA=OTG. 10/25/13 T/1/0=unk/50/160.Temp.=SI. Bleed OA to 0 psi. No AL,wellhouse,flowline or scaffolding around well. Cannnot reach Tree Cap. Bled OAP from 160 psi to 0 psi in 1 min. Monitor for 30 min. OAP unchanged. Final WHPs= unk/50/5. SV,MV=C. IA&OA=OTG. NOVP. 1200 hrs. 10/26/13 T/I/0=??/50/10.Temp=Sl. WHPs(post bleed).Well disco from system. IAP unchanged, OAP increased 5 psi overnight. SV, MV=C. No SSV, WV. lAx2&OAx2=OTG. NOVP. 0815. 10/30/13 T/I/0=??/50/10.Temp=Sl.T& IA FL(RWO prep).Well disco from system. Unable to get T FL& pressure. IA FL @ surface. IAP&OAP unchanged since 10/26/13. SV, MV=C. No SSV or WV. lAx2& OAx2=OTG. NOVP. 0955. Page 3 of 3 North America-ALASKA-BP Page 1 of 8 Operation Summary Report Common Well Name:W-18 AFE No Event Type:WORKOVER(WO) Start Date:11/12/2013 End Date:11/21/2013 rX3-013T7-C:(3,321,000.00) Project:Prudhoe Bay Site:PB W Pad Rig Name/No.:PARKER 273 Spud DateTme:11/12/1988 12:00:00AM Rig Release:11/21/2013 Rig Contractor:PARKER DRILLING CO. UWI:500292188000 Active datum:Kelly Bushing/Rotary Table©82.00usft(above Mean Sea Level) Date From-To Hrs Task Code NPT I NPT Depth Phase Description of Operations (hr) (usft) I 11/12/2013 1 06:00 - 12:00 6.00 RIGD P PRE RIG DOWN,SKID IN RIG FLOOR,LAYDN MAST 12:00 - 18:00 6.00 RIGD P PRE SEPERATE MUD MODULE FROM DRILLING MODULE BY 50 FT 18:00 - 00:00 6.00 MOB P PRE SEPARATE UTILITY MODULE FROM DRILLING MODULE,TURN UTILITY MODULE AND MOVE TO W-18,MOVE AND TURN DRILLING MODULE,MOVE DRILLING MODULE AND STAGE AT END OF PAD,TURN MUD MODULE 1 AND STAGE BEHIND DRILL MODULE, REMOVE DUMMY WELL HOUSE AND STAGE BESIDE DRILLING MODULE FOR WELDING REPAIR. 11/13/2013 00:00 - 09:30 9.50 RIGU P PRE SET DUMMY WELL HOUSE OVER WELL, MOVE AND TURN UTILITY MODULE,MOVE DRILLING MODULE ACROSS PAD AND TURN TO SPOT OVER WELL,MOVE MUD MODULE ACROSS PAD AND TURN 09:30 - 12:00 2.50 RIGU P PRE I CONNECT INTERCONNECTS,SHIM MODULES,RU POWER TO WELL HOUSE 12:00 - 14:00 2.00 RIGU P I I PRE PJSM.RU INTERCONNECTS AND MODULSE. l ASSIST ELECTRICIAN WITH ELECTRICAL PLUG BOARDS. 14:00 - 15:30 1.50 RIGU P i PRE PJSM.RAISE DERRICK.P/U WT=515K.SKID RIG FLOOR TO DRILLING POSITION.SKI HAUNCH AND RAISE PIPE CAT. 15:30 - 20:00 4.50 RIGU P PRE RU RIG FLOOR AND INTERCONNECTS. BRIDLE DOWN.UNPIN FORUM CRANE, STABBING BOARD AND IDM.PIN TORQUE TUBE.CALIBRATE BLOCKS. 20:00 - 21:00 1.00 RIGU P PRE RU TO CIRCULATE OUT FREEZE PROTECT. I TAKE ON FLUIDS TO ACTIVE SYSTEM. -RIG ACCEPT AT 11/13/2013 20:00. 21:00 - 21:30 0.50 RIGU P I PRE HOLD RIG EVACUATION DRILL WITH ALL ON SITE PERSONNEL.HOLD AAR. 21:30 - 23:00 1.50 RIGU P PRE REBUILD DEMCO VALVE(K1)ON MUDLINE. PRESSURE TEST HIGH PRESSURE MUD LINE. INSTALL ROOFTOP WALWAYS. CONTINUE TAKING ON FLUIDS. 23:00 - 00:00 1.00 RIGU P PRE PU/RU LUBRICATOR TO TOP OF TREE 11/14/2013 00:00 - 01:30 1.50 WHSUR P DECOMP RU LUBRICATOR AND ATTEMPT TO TEST, REPAIR LEAKING FITTING ON LUBRICATOR, TEST 250/3500 PSI FOR 5/5 MIN,PULL TWC VALVE 01:30 - 02:30 1.00 WHSUR P DECOMP R/D LUBRICATOR,R/U CIRCULATING HOSES 02:30 - 03:00 0.50 WHSUR P DECOMP RUN FIRE AND EVAC DRILL WITH CREW,MR 03:00 - 05:30 2.50 WHSUR P DECOMP CIRC OUT FREEZE PROTECT TO TIGER TANK -PUMP 30 BBLS REVERSE DOWN I/A TO CLEAR DIESEL FROM TUBING,25 SPM© 1000 PSI -PUMP 250 BBLS LONG WAY TO CLEAR DIESEL FROM I/A,30 SPM @ 1545 PSI Printed 12/2/2013 11:22:04AM North America-ALASKA-BP Page 2 of 8 Operation Summary Report -- — - - - - - —_ _-- — - --------- ------------------ Common Well Name:W-18 AFE No Event Type:WORKOVER(WO) I Start Date:11/12/2013 End Date:11/21/2013 X3-013T7-C:(3,321,000.00) Project:Prudhoe Bay Site:PB W Pad Rig Name/No.:PARKER 273 Spud Date/Time:11/12/1988 12:00:OOAM Rig Release:11/21/2013 Rig Contractor:PARKER DRILLING CO. UWI:500292188000 Active datum:Kelly Bushing/Rotary Table©82.00usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase I Description of Operations (hr) (usft) 05:30 - 10:30 5.00 WHSUR P DECOMP MONITOR WELL 10 MIN=STATIC,BLOW DOWN,RIG DOWN HOSE FROM TUBING -RN LUBRICATOR AND TEST FROM ABOVE TO 250/3500 PSI FOR 5/5MIN -TEST FROM BELOW TO 250/1000 PSI FOR 5 /5 MIN FROM BELOW 10:30 - 12:00 1.50 WHSUR P DECOMP RIG DOWN PUMP HOSES,DRAIN TREE,ND TREE • 12:00 - 13:00 1.00 WHSUR P DECOMP NIPPLE DOWN TREE ADAPTER FLANGE AND RACK BACK IN CELLAR DECK.ASSIST _ CAMERON W/WELLHEAD WORK. 13:00 - 18:00 5.00 BOPSUR P DECOMP N/U BOPE.RIG UP CELLAR DECK. 18:00 - 00:00 6.00 BOPSUR P DECOMP PJSM.CHANGE OUT ANNULAR PREVENTER 11/15/2013 00:00 - 01':30 1.50 BOPSUR P DECOMP TORQUE CAP BOLTS ON ANNULAR PREVENTER CAP. 01:30 - 03:30 2.00 BOPSUR P DECOMP CENTER BOP STACK OVER CENTER OF HOLE WITH CHAIN HOISTS. INSTALL FLOW NIPPLE. 03:30 - 06:00 2.50 .BOPSUR P DECOMP FUNCTION TEST ANNULAR WITH HYDRAULICS(FAIL,ANNULAR LEAKED EXTERNALLY AT CAP). PULL FLOW NIPPLE AND PREPARE TO REMOVE ANNULAR CAP. 06:00 - 18:00 12.00 BOPSUR N RREP 130.00 DECOMP -NON CODE 8,REMOVE ANNULAR PREVENTER CAP AND ANNULAR ELEMENT. CHANGEOUT SEALS. REINSTALL ANNULAR ELEMENT AND PREVENTER CAP. FUNCTION TEST ANNULAR(PASS). RE-INSTALL FLOW NIPPLE AND FLOWLINE. 18:00 - 20:00 2.00 BOPSUR P DECOMP RIG UP TO TEST BOPE. FILL ALL LINES AND MUD-GAS SEPARATOR. 20:00 - 00:00 4.00 BOPSUR P DECOMP FUNCTION-PRESSURE TEST BOPE TO 250 PSI LOW AND 3500 PSI HIGH FOR 5 MIN EACH. STATE'S RIGHT TO WITNESS TEST WAIVED BY AOGCC REPRESENTATIVE JEFF TURKINGTON. -TEST ANNULAR WITH 3-1/2"TEST JOINT, TEST VARIABLE BORE RAMS WITH 3-1/2'AND 4"TEST JOINTS -SEE ATTACHED DOCUMENTATION(ON 11/16 REPORT) -LOWER IBOP(MANUAL)AND KILL LINE HCR VALVE FAILURES -TESTING COMPLETED ON 11/16/13 11/16/2013 00:00 - 03:30 3.50 BOPSUR P DECOMP COMPLETE FUNCTION-PRESSURE TESTING BOPE TO 250 PSI LOW AND 3500 PSI HIGH FOR FIVE MIN EACH.STATE'S RIGHT TO WITNESS TEST WAIVED BYAOGCC REPRESENTATIVE JEFF TURKINGTON. -TEST ANNULAR WITH 3-1/2"TEST JOINT, TEST VARIABLE BORE RAMS WITH 3-1/2"AND 4"TEST JOINTS -SEE ATTACHED DOCUMENTATION(ON 11/16 REPORT) -LOWER MANUAL IBOP(LAST CHANGED OUT 6/20/2013)AND KILL LINE HCR VALVE FAILURES 03:30 - 08:30 5.00 BOPSUR N RREP 130.00 DECOMP NON CODE 8,CHANGE OUT LOWER IBOP ON TOP DRIVE,AND KILL LINE HCR VALVE 08:30 - 09:30 1.00 BOPSUR P DECOMP TEST KILL LINE HCR VALVE AND LOWER IBOP,250PSI LOW FOR 5 MIN,3500PSI HIGH FOR5MIN Printed 12/2/2013 11:22:04AM North America AU kA-BP of 8 Operation Summary Report Common Well Name:W-18 AFE No Event Type:WORKOVER(WO) 1 Start Date:11/12/2013 End Date:11/21/2013 X3-013T7-C:(3,321,000.00) Project:Prudhoe Bay , Site:PB W Pad Rig Name/No.:PARKER 273 Spud Date/Time:11/12/1988 12.00:00AM Rig Release:11/21/2013 Rig Contractor:PARKER DRILLING CO. UWI:500292188000 Active datum:Kelly Bushing/Rotary Table©82.00usft(above Mean Sea Level) Data 1 From-To Hrs Task Code NPT NPT Depth 1 Phase Description of Operations (hr) (usft) 09:30 - 10:30 1.00 WHSUR P DECOMP HOLD PJSM WITH RIG CREW,R/U DUTCH RISER AND LUBRICATOR,TEST LUBRICATOR 250PSI LOW FOR 5 MIN 3500PSI HIGH FOR 5 MIN 10:30 - 12:00 1.50 WHSUR P i DECOMP PULL TWC,CONFIRM WELL STATIC,RIG DOWN LUBRICATOR AND DUTCH RISER 12:00 - 13:30 1.50 PULL P � DECOMP M/U XO TO 4"DP,SCREW INTO 3.5"TUBING HANGER AS PER CAMERON REP.,BACK OUT LOCK DOWN SCREWS,UNSEAT HANGER,P/U WT=105K(AS EXPECTED),P/U SPACE OUT AND CLOSE ANNULAR 13:30 - 17:00 3.50 PULL P DECOMP CIRCULATE SURFACE TO SURFACE VOLUME THROUGH MUD-GAS SEPARATOR. FLOWCHECK WELL(STATIC). OPEN ANNULAR PREVENTER. -4 BPM,360 PSI. -PICKUP=99 KLBS,SLACKOFF=95 KLBS 17:00 19:00 2.00 PULL P DECOMP LAYDOWN DRILLPIPE,XO AND HANGER. 1 CHANGEOUT BX ELEVATOR INSERTS TO 3-1/2" 19:00 - 00:00 l 5.00 PULL P ' DECOMP j LAYDOWN 3-1/2",9.3#,L-80,NSCT TUBING !FROM CUT AT 8594'MD TO 5400 MD AT MIDNIGHT. 11/17/2013 00:00 - 07:30 7.50 PULL P DECOMP LAYDOWN 3-1/2",9.3#,L-80,NSCT TUBING FROM CUT AT 5400'MD AT MIDNIGHT TO SURFACE. -261 TOTAL JOINTS RECOVERED -(1)'X'NIPPLE ASSEMBLY -(6)GLM ASSEMBLIES -(2)PUP JOINTS -CUT JOINT IN GOOD CONDITION(MINOR FLARE),2.48'LONG -ALL EQUIPMENT TESTED FOR NORM (NEGATIVE)PRIOR TO REMOVING FROM LOCATION 07:30 - 09:00 1.50 PULL P DECOMP RIG DOWN TONGS,AIR SLIPS AND BX ELEVATORS. CLEAN AND CLEAR RIG FLOOR AFTER TRIPPING. 09:00 - 15:30 6.50 WHSUR P DECOMP UNSUCCESSFUL 9-5/8"PACKOFF CHANGEOUT WORK AS FOLLOWS: -DRAIN STACK. MAKEUP AND RUN IN HOLE WITH PACKOFF RETRIEVING TOOL ON 4" DRILLPIPE. ENGAGE 9-5/8"PACKOFF AND BACKOUT LOCKDOWN SCREWS,DURING WHICH CASING SHOWS SIGNS OF GROWING. RE-RUN IN LOCKDOWN SCREWS AND TORQUE TO 600 FT-LBS. INJECT PACKING IN PACKOFF V SEAL TO 5000 PSI. -PRESSURE TEST 9-5/8"PACKOFF TO 250 PSI LOW FOR FIVE MIN AND 3500 PSI HIGH FOR 30 MIN(PASSING TESTS,SEE ATTACHED CHARTS). -PULLAND LAYDOWN PACKOFF 1 RETRIEVEING TOOL. 15:30 - 16:00 0.50 WHSUR P CLEAN SET WEAR RING,ID=9" Printed 12/2/2013 11:22:04AM North America-ALASKA-BP Page 4 of 8 Operation Summary Report Common Well Name:W-18 AFE No Event Type:WORKOVER(WO) Start Date:11/12/2013 End Date:11/21/2013 X3-013T7-C:(3,321,000.00) Project:Prudhoe Bay Site:PB W Pad Rig Name/No.:PARKER 273 Spud Date/Time:11/12/1988 12:00:00AM Rig Release:11/21/2013 Rig Contractor.PARKER DRILLING CO. UWI:500292188000 Active datum:Kelly Bushing/Rotary Table©82.00usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 16:00 - 18:00 2.00 CLEAN P CLEAN MAKEUP AND RUN IN HOLE WITH BAKER 19-5/r CLEANOUT ASSEMBLY FROM SURFACE TO BHA OVERALL LENGTH AT 268'MD -8-1/2"X 3-9/16"DRESSOFF SHOE -5-3/4"WASHOVER BOOT BASKET -(2)7"BOOT BASKETS -9-5/8"CASING SCRAPER -EXTREME CLEAN STRING MAGNET 6-1/4"BUMPER AND OIL JARS -(6)6-1/2"STEEL DRILL COLLARS 18:00 - 00:00 6.00 CLEAN P CLEAN SINGLE IN HOLE WITH 9-5/8"CLEANOUT ASSEMBLY ON 4"DRILLPIPE FROM BHA AT 268'MD TO 4100'MD AT MIDNIGHT 11/18/2013 00:00 - 06:00 6.00 CLEAN P CLEAN SINGLE IN HOLE WITH 9-5/8"CLEANOUT ASSEMBLY ON 4"DRILLPIPE FROM 4100'MD AT MIDNIGHT TO 8550'MD. 06:00 - 06:30 0.50 CLEAN P CLEAN ROTATE AND RECIPROCATE CASING SCRAPER FROM 8440'MD TO 8520'MD -250 GPM,530 PSI,40 RPM,3K TO 06:30 - 07:30 1.00 CLEAN P CLEAN TIH,TAG TUBING STUB @ 8604'MD. SWALLOW TUBING STUB TO 8621'MD, S S PK -250 DRES GPMOFF,520 PSI,TUBING 40 RPM TUB,3E KR TQ BAER REP -PU WT 173,SO WT 168,ROT WT 170 07:30 - 10:30 3.00 CLEAN P CLEAN CIRCULATE WELL CLEAN WITH 120°F SEAWATER. FLOWCHECK WELL FOR 10 MIN (STATIC). -PUMP HIGH VIS SWEEP(NO INCREASE IN RETURNS) -425 GPM,1430 PSI 10:30 - 22:00 11.50 CLEAN P CLEAN POH,L/D DP FROM 8600'MD TO BHA AT 268' MD I-MONITOR WELL ON TRIP TANK=HOLE TAKING PROPER DISPLACEMENT -FLOW CHECK WELL 10 MIN PRIOR TO PULLING NON-SHEARABLES THROUGH STACK=STATIC -HOLD UNNANOUNCED D1 DRILL AND AAR 22:00 - 23:30 1.50 CLEAN P CLEAN UD CLEANOUT BHAAS PER BAKER REP FROM 268'MD TO SURFACE -MINOR METAL SHAVINGS ON STRING MAGNET ONLY. 23:30 - 00:00 0.50 WHSUR P CLEAN CLEAN AND CLEAR RIG FLOOR,PULL WEAR BUSHING 11/19/2013 00:00 - 01:00 1.00 RUNCOM P RUNCMP MU HANGER,PERFORM DUMMY RUN WITH CAMERON REP. VERIFY HANGER SET IN PROFILE IN WELLHEAD,MARK LANDING JT AND LD HANGER 01:00 - 03:00 2.00 RUNCOM P RUNCMP RIG UP TO RUN 3-1/2"TUBING,HOLD PJSM WITH RIG AND CASING CREW Printed 12/2/2013 11:22:04AM North America-ALASKA-BP Page 5 of 8 Operation Summary Report Common Well Name:W-18 AFE No Event Type:WORKOVER(WO) Start Date:11/12/2013 End Date:11/21/2013 IX3-013T7-C:(3,321,000.00) Project:Prudhoe Bay Site:PB W Pad Rig Name/No.:PARKER 273 Spud Date/Time:11/12/1988 12:00:00AM Rig Release:11/21/2013 Rig Contractor:PARKER DRILLING CO. UWI:500292188000 Active datum:Kelly Bushing/Rotary Table©82.00usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 03:00 - 16.30 13.50 RUNCOM P RUNCMP RUN IN HOLE WITH 3-1/2",9.2#,13CR,JFE BEAR/VAMTOP PRODUCTION TUBING FROM SURFACE TO JOINT#267 AT 7998'MD 11-OPT MU TORQUE FOR VAMTOP=2900 FT-LBS,JFE BEAR=3870 FT-LBS BAKER LOK APPLIED TO ALL CONNECTIONS BELOW PACKER TORQUE TURN AND APPLY JET LUBE SEAL GUARD TO ALL TUBING CONNECTIONS -AVERAGE 25-30 JOINTS/HR WHEN RUNNING -HOLD KICK WHILE TRIPPING(D1)DRILL AND AAR. 16:30 - 17:00 0.50 RUNCOM P RUNCMP SERVICE AND LUBRICATE RIG 17:00 - 18:00 1.00 RUNCOM N RREP 8,604.00 RUNCMP IADC CODE 8 NPT-TROUBLESHOOT AND REPAIR PIPE SKATE(TRAVELING LINE UNSPOOLED) 18:00 - 19:00 1.00 RUNCOM P RUNCMP RUN IN HOLE WITH 3-1/2"TUBING FROM 7998' MD TO OVERSHOT NO-GO AT 8623'TUBING MD(30'IN ON JT 286). -OBSERVE FIRST SET SHEAR PINS AT 8612' TUBING MD(10 KLBS SO WEIGHT). -OBSERVE SECOND SET SHEAR SCREWS AT 8620'TUBING MD(10 KLBS SO WEIGHT). 19:00 - 20:00 1.00 RUNCOM , P RUNCMP SPACEOUT AND LAND 3-1/2",9.2#,13CR, VAMTOP/JFE BEAR COMPLETION ASSEMBLY AS FOLLOWS: -LAYDOWN JOINTS 288,287,&286. MAKEUP 9.73'PUP,JOINT 286&HANGER/PUP (CAMERON MCEVOY SSH MS/CCL 13"X 4-1/2" TC II TOP.BOTTOM WITH 4"TYPE H BPV PROFILE). RUN IN HOLE ON TC-II LANDING JOINT AND LAND STRING ON MANDREL HANGER AT 8616'MD,3'ABOVE NO-GO,12' SWALLOW. -PARKER 273 RKB TO UPPER LOCKDOWN II SCREWS=44.36'MD. -FINAL PICKUP WEIGHT=100 KLBS, SLACKOFF=100 KLBS,PARKER 273 BLOCKS =35 KLBS -NOTE: CORRECT ALL DEPTHS TO TUBING STUB DEPTH OF 8604'MD FROM THIS TIME ENTRY FORWARD(DRILLPIPE TAG) FINAL TUBING LANDING DEPTH=8616'MD HES TNT 7"X 4-1/2"PERMANENT PRODUCTION PACKER AT 8505'MD DCK-2 SHEAR VALVE INSTALLED IN GLM#7 AT 3189'MD -DEEPEST'X'NIPPLE AT 8540'MD HAS RHC-M PLUG INSTALLED -EXCEL TUBING TALLY ATTACHED 20:00 - 21:30 1.50 RUNCOM P RUNCMP CAMERON REPRESENTATIVE ON LOCATION TO RUN IN ALL LOCKDOWN SCREWS 3-1/2", 500 FT-LBS TORQUE. LAYDOWN LANDING f JOINT. HOLD PJSM FOR CIRCULATING. - Printed 12/2/2013 11:22:04AM North America-ALASKA-BP Page 6 of 8 Operation Summary Report Common Well Name:W-18 AFE No Event Type:WORKOVER(WO) I Start Date:11/12/2013 1 End Date:11/21/2013 1X3-013T7-C:(3,321,000.00) I Project:Prudhoe Bay Site:PB W Pad Rig Name/No.:PARKER 273 1 Spud Date/Time:11/12/1988 12:00:00AM Rig Release:11/21/2013 Rig Contractor:PARKER DRILLING CO. UWI:500292188000 Active datum:Kelly Bushing/Rotary Table @82.00usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 1 21:30 - 00.00 2.50 RUNCOM P RUNCMP LINE UP DOWN IA AND DISPLACE WELL TO CLEAN 8.5 PPG SEAWATER AS FOLLOWS;5 1 BPM,325 PSI -TUBING SIDE SURFACE TO OVERSHOT=8.5 PPG 120°F SEAWATER -IA SIDE SURFACE TO OVERSHOT=8.5 PPG 120°F CORROSION-INHIBITED SEAWATER -PUMP 5 BBLS DOWN TUBING AT END OF CIRCULATING TO CLEAN OFF RHC-M PROFILE. - 01:00 1.00 RUNCOM RUNCMP- - 11/20/2013 P 00:00 � i INSTALL LANDING JOINT. HALLIBURTON REPRESENTATIVE ON LOCATION TO DROP I BALL AND ROD. ALLOW TO DROP FOR 10 MIN. LAYDOWN LANDING JOINT. 01:00 - 08:00 7.00 RUNCOM P RUNCMP :SET 9-5/8"X 3-1/2"HES TNT PERMANENT PACKER. PRESSURE TEST TUBING TO 250 PSI LOW FOR 5 MIN AND 3500 PSI HIGH FOR 30 MIN(PASS). BLEED TUBING PRESSURE TO 2000 PSI. PRESSURE TEST IA TO 250 PSI LOW FOR FIVE MIN(PASS). PRESSURE UP ON IA TO 2600 PSI AND TUBING BEGINS TO TRACK AT 2600 PSI ON IA(2350 ON TUBING). CONTINUE TO PRESSURE UP ON BOTH TUBING AND IA TO 3500 PSI. HOLD FOR 30 MIN(PASS). BLEED IA TO 0 PSI AND TUBING PRESSURE TRACKS TO 0 PSI. DISCUSS 1 RESULTS WITH ANCHORAGE TEAM AND TROUBLESHOOT TXIA COMMUNICATION. CONFIRM ISSUE IS DOWNHOLE. RE-PRESSURE UP ON TUBING TO 3500 PSI AND PRESSURE HOLDS(CONFIRMING DCR-1 SHEAR HAS NOT SHEARED). LINE UP DOWN IA AND PUMP 5 BPM. PRESSURE INITIALLY ;VERY ERRATIC BUT STABILIZES AT 400 PSI AFTER 3 BBLS AWAY. LINE UP DOWN TUBING AND PUMP 3 BPM TO CONFIRM COMMUNICATION BOTH WAYS. -SEE ATTACHED CHART AND DOCUMENTATION. OBTAIN APPROVAL TO PROCEED FROM WELLS TEAM LEADER. -VOLUMES TO PRESSURE UP=VOLUMES BLED BACK(DOCUMENTATION FOR 1 HOUR MONITOR PERIOD PRIOR TO SETTING TWC) -NOTE: DIAGNOSTIC WORK REQUIRED POST RIG BY WELLS GROUP TO DETERMINE SOURCE OF TXIA COMMUNICATION. 08:00 - 09:00 1.00 WHSUR P I WHDTRE CAMERON REPRESENTATIVE ON LOCATION TO SET CIW TYPE'H'4"BPV WITH DRY ROD. PRESSURE TEST TWC FROM BELOW TO 250 PSI LOW FOR 5 MIN AND 1000 PSI HIGH FOR 10 MIN(PASS). PRESSURE TEST FROM ABOVE TO 250 PSI LOW FOR 5 MIN AND 3500 !PSI HIGH FOR 10 MIN(PASS,SEE ATTACHED CHART). 09:00 - 14:30 5.50 BOPSUR P WHDTRE NIPPLE DOWN BOP STACK AND RACK BACK FOR RIG MOVE. Printed 12/2/2013 11:22:04AM North America-ALASKA-BP Page 7 of B Operation Summary Report Common Well Name:W-18 AFE No Event Type:WORKOVER(WO) Start Date:11/12/2013 End Date:11/21/2013 X3-013T7-C:(3,321,000.00) Project:Prudhoe Bay Site:PB W Pad Rig Name/No.:PARKER 273 Spud Date/Time:11/12/1988 12:00:00AM Rig Release:11/21/2013 Rig Contractor:PARKER DRILLING CO. UWI:500292188000 Active datum:Kelly Bushing/Rotary Table©82.00usft(above Mean Sea Level) _ Date From-To Hrs Task Code -NPT NPT Depth Phase Description of Operations (hr) (usft) — 14:30 - 18:00 3.50 WHSUR P WHDTRE NIPPLE UP CAMERN MCEVOY MS/CCL 13-5/8" X4-1/8"5000 PSI TUBING HEAD ADAPTER AND DOUBLE 4-1/8"GATE VALVE DRY HOLE TREE. -CAMERON PRESSURE TEST ADAPTER TO 250 PSI LOW FOR FIVE MIN AND 5000 PSI HIGH FOR 30 MIN(PASS,SEE ATTACHED CHARTS). 18:00 - 19:30 1.50 WHSUR P WHDTRE PRESSURE TEST DRYHOLE TREE TO 250 PSI LOW AND 5000 PSI HIGH FOR FIVE MIN EACH (PASS,SEE ATTACHED CHART). 19:30 - 22:00 2.50 WHSUR P WHDTRE MIRU VALVE SHOP LUBRICATOR CREW. PRESSURE TEST LUBRICATOR TO 250 PSI LOW AND 3500 PSI HIGH FOR 5 MIN EACH TO LEAKTIGHT CRITERIA(PASS,SEE ATTACHED CHART). PULL CIW 4"TYPE'H'TWC. RIG DOWN LUBRICATOR. 1 22:00 - 00:00 I 2.00 WHSUR P WHDTRE MIRU LITTLE RED SERVICES. PRESSURE TEST LINES TO 250 PSI LOW AND 3500 PSI HIGH FOR 5 MIN EACH TO LEAKTIGHT CRITERIA(PASS). 11/21/2013 00:00 - 02:30 2.50 WHSUR P I WHDTRE I LINE UP DOWN IA WITH LITTLE RED SERVICES. PUMP 155 BBLS 6.8 PPG 80°F DIESEL. SHUT IN LRS AND LINE UP U-TUBE. ALLOW IA AND TUBING TO U-TUBE FOR 1 HOUR. CONFIRM NO PRESSURE AT END. -TUBING(19 BBLS)AND IA(136 BBLS) FREEZE PROTECTED TO 2200'MD/TVD 02:30 - 04:00 1.50 WHSUR P WHDTRE RIG UP AND PRESSURE TEST VALVE SHOP LUBRICATOR TO 250 PSI LOW AND 3500 PSI I HIGH FOR FIVE MIN EACH(PASS PER LEAKTIGHT CRITERIA). SET CIW 4"TYPE H BPV. 04:00 - 04:30 0.50 WHSUR P WHDTRE LITTLE RED PRESSURE TEST BPV FROM BELOW TO 250 PSI LOW FOR FIVE MIN AND 1000 PSI HIGH FOR 10 MIN(PASS,SEE ATTACHED CHART). 04:30 - 05 30 I 1.00 W-ISUR P WHDTRE RDMO LITTLE RED SERVICES AND RIG DOWN CIRCULATING LINES IN CELLAR. Printed 12/2/2013 11:22:04AM North America-ALASKA-BP Page 8 of 8 Operation Summary Report Common Well Name:W-18 AFE No Event Type:WORKOVER(WO) Start Date:11/12/2013 I End Date:11/21/2013 X3-013T7-C:(3,321,000.00) Project:Prudhoe Bay Site:PB W Pad Rig Name/No.:PARKER 273 Spud Date/Time:11/12/1988 12:00:00AM Rig Release:11/21/2013 Rig Contractor PARKER DRILLING CO. UWI:500292188000 Active datum:Kelly Bushing/Rotary Table @82.O0usft(above Mean Sea Level) Date From-To Hrs Task 1 Code NPT I NPT Depth Phase Description of Operations (hr) I (usft) 05:30 - 10:00 4.50 WHSUR P WHDTRE CLEAN CELLAR AND SECURE WELL WITH I PROPER ANNULUS EQUIPMENT. 1 SIMOPS: GENERAL RIG DOWN OPERATIONS IN PREPARATION FOR RIG MOVE. SECURE TOP DRIVE AND BRIDLE UP. RELEASE PARKER RIG 273 AT 10:00 ON 11/21/2013. NEXT WELL: Z-32C WELLWORK TRANSFER PERMIT CLOSED I OUT WITH PAD OPERATOR WELL HANDOVER COMPLETE WITH WELLS GROUP ALL TREE AND WELLHEAD VALVES CLOSED TO GAUGES FINAL T/I/O PRESSURE=0/0/0 PSI PERFORMANCE SUMMARY(TARGETS ORIGINALLY SET FOR DOYON 16): I AFE P50=8.5 DAYS,TARGET=7.5 DAYS, I i ACTUAL=9.2 DAYS Printed 12/2/2013 11:22:04AM TREE----. 4-1/16'CNV WaLHEAD= NCEVOY W-1 8 s AFL ,OTES:***3-1/2"CHROME TBG*** ACTUATOR= BAKER C i 1 11.....ji...1 INITIAL KB Eli 82' i 2133' j-13-1/2'HES X NP,ID=2.813" KOP= 5177l 20'CONDUCTOR —1 ? 1 Max Angle= 29°@ 6195' . GAS LFT MANDRELS — --- Datum MD= 9208 ST ND TVD CEV TYPE VLV 'LATCH PORT DATE Da tiirri IV D= 8866ss L 5 3192 3192 0 NM [WY' RK 0 11/29/13' ......._ 4 5109 5109 8 WAG [MY RK 0 11/29/13 13-3/8'CSG,72#,L-80 BTRS,V=12.347- I—E2663' 3 6181 6108 30 NPAG [WI' FE 0 11/29/13 2 7286 7103 23 MMG DMY FE 0 11/29/13 3-1/2"TBG,9.2#,13CR-85 JFE BEAR, H 4682' 1 8261 7996 24 MMG MY RK 0 11/29/13 X0 TO 13CR-85 VAM TOP 8482' —13-1/2"HES X 2.813" I Minimum ID =2.750" @ 8629' 8508' —9-5/8"X 3-1/2"HES TNT PKR,ID=2 949" 1 3-1/2" HES X NIPPLE j ■1 • 8543' —13-1/7 HES X NIP,D=2.813".1 3-1/2'TBG,9.2#,13CR-85 VAM TOP, H 8601' 8616' H 9-5/8'X 3-1/2"UNIQUE OVERSHOT .0087 bpi,E)=2.992' 8629' —13-1/2"HES X NP,ID=2.750' 8638' —9-5/8'X 4-1/2'BKR SAB-3 PKR,ID=3.875' 13-1/2 TBG STUB(06/26/13) — 8604' gall IM . 3-1/2"CIPB(06/26113)1.—I 8666' 8660' H 3-1/2"HES X NIP,ID=2.750' 13-1/2"TBG STUB(07/04.100) 1 —8671 TOP OF 7'LNR — 8736' 8688' —3-1/2"BKR SEAL ASSY W/O SEALS,ID=3.001" 3-1/2"TBG,9.2#,L-80,.0087 bpf,ID=2.992" —1 8765' IC 8684' j—,9-5/8'X 4-1/2"BKR SAB-3 FKR,I0=3,99' = 9-5/8'CSG,47#,NT-80S BUTT X0 TO NSCC H 8846' 8732' 1-13-1/2"SVVS NP,0 2150' 9-5/8'CSG,47#,NT-80S,0=8,681" —1 9003' II • 8739' 1—3-1/2"CEP(06/22/13)1 8753' 1-13-1/2*SWS NP,0=2750j PERFORATION SUMMARY \ 8765' .1—3-1/2'INLEG,ID-2.997 REF LOG: BHC-GR ON 11/25/88 8770' I—B_MB TT LOGGED 03/11/93 ANGLE AT TOP RERF 18°©9161' >.< Note,Refer to Production DB for historical perf data H 'MARKER JOINT • SIZE Sic INTERVAL Opn/Sqz SHOT SQZ , 2" 6 9161-9171 0 06/20/09 ll■ 2" 6 9176-9181 0 06/20/09 2" 6 9188-9198 0 06/20/09 2-1/2" 6 9210-9230 0 08/08/03 2-112" 6 9225-9260 0 09/03/96 I 5" 4 9268-9288 0 08/02/90 5" 4 9268-9288 S 11/29/88 08/01/90 5" 4 9292-9317 0 08/02/90 5" 4 9292-9317 S 11/29/88 08/01/90 5" 4 9320-9330 0 08/02/90 : 9353' H 7"X 3-1/2"OTIS WD FKR,ID= ? 1 Z 14 5' 4 9320-9330 S 11/29/88 08/01/90 5" 4 9339-9344 0 08/02/90 lib I 9362' H FISH-(2)4"X 2.5'PKR RUBBER 1 5" 4 9339-9344 S 11/29/88 08/01/90 1 ...,..... 111-- 9362' H 3-1/2'0715 X NIP,D=2,750" 5" 4 9344-9350 08/02/90 9362' 3-1/2"XX PLUG SET 5' 4 9359-9364 S 11/29/88 08/01/90 5" 4 9374-9384 C 08/02/90 / H 3-1/2"PARKER VVLEG,ID=2.992" 5" 12 9405-9410 S 07/31/90,08/01/90 9396' I—7"CEMENT RETAINER . 3-1/2'1BG,9.3#,L-80,.0087 bpf,ID=2.992' 1-1 9363' I PUT° --{ 9432' r LNR,26#,L-80 U4S,.0383 bpf,ID=6.276' — 9550' 1 11.......A.4 DATE REV BY ODMIV '•ENTS DATE REV BY COMMENTS PRUDHOE BAY LINT 11/28/88 SA INITIAL COMPLETION 12/02/13 DAJ/PJC ODE FINIAL APPROVAL VVB.L.: W-18 08/05/90 0-16 RWO 12/02/13 WWI PJC GLV Q0(11/29/13) PERMIT NO:"1881280 ,. 07/14/00 N4ES _RWO API Na: 50-029-21880-00 _ 11/21/13 PKR 273 RWO - — SEC 21,T11N,R12E,731 FNL&1187 FEL 11/21/13 PJC DRLG DRAFT UPDATE 11/24/13 PJC CIFIGL HO OBRRECTIONS . ' BP Exploration(Alaska) ` • • ® F //7, T Alaska Gas s THE STATE aska �' ofA LA s KA ciyaservation Commission GOVERNOR SEAN PARNELL `7F.N 333 West Seventh Avenue Anchorage, Alaska 99501 -3572 FALASY'� 2� Main: 907.279.1433 13 AU � c o YJr Fax: 907.276.7542 s!r 1 , G V John McMullen „J Engineering Team Leader BP Exploration (Alaska), Inc. $ �{j ✓ 1 P.O. Box 196612 Anchorage, AK 99519 -6612 Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, PBU W -18 Sundry Number: 313 -282 Dear Mr. McMullen: Enclosed is the approved Application for Sundry Approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the Commission grants for good cause shown, a person affected by it may file with the Commission an application for reconsideration. A request for reconsideration is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. Sincerely, Cathy P. roerster Chair S4 DATED this ti day of June, 2013. Encl. STATE OF ALASKA . •v 6 Fl S 6 � J i ALASKAOIL AND GAS CONSERVATION COMMISSION � JUN JJ „ SUNDRY APPROVAL °'�� Q 2013 APPLICATION FO R 20 AAC 25.280 ACC 1. Type of Request: ❑ Abandon ® Plug for Redrill • ❑ Perforate New Pool ❑ Repair Well ❑ Change Approved Program ❑ Suspend ❑ Plug Perforations ❑ Perforate ❑ Pull Tubing ❑ Time Extension ❑ Operations Shutdown ❑ Re -Enter Suspended Well ❑ Stimulate ❑ Alter Casing ❑ Other 2. Operator Name 4. Current Well Class 5. Permit To Drill Number BP Exploration (Alaska) Inc. ❑ Exploratory ❑ Stratigraphic 188 - 128 • 3. Address: ® Development ❑ Service 6. API Numbe P.O. Box 196612, Anchorage, Alaska 99519 -6612 50.029- 21880 -00 -00 • 7. If, perforating: 8. Well Name and Number: What Regulation or Conservation Order governs well spacing in this pool? PBU W -18 . Will planned perforations require a Spacing Exception? ❑ Yes ® No 9. Property Designatior 10. Field / Pool(s): ADL 028263 , Prudhoe Bay / Prudhoe Bay . 11. PRESENT WELL CONDITION SUMMARY Total Depth MD (ft): Total Depth TVD (ft): Effective Depth MD (ft): Effective Depth TVD (ft): Plugs (measured): Junk (measured): 9550' • 9206' • 9432' 9094' 8660', 9362', 9396' 9362' Casing Length Size MD TVD Burst Collapse Structural Conductor 80' 20" 30' - 110' 30' - 110' Surface 2634' 13 -3/8" 29' - 2663' 29' - 2663' 4930 2270 Intermediate 8975' 9 -5/8" 28' - 9003' 28' - 8687' 6870 4760 Production Liner 814' 7" 8736' - 9550' 8435' - 9206' 7240 5410 Perforation Depth MD (ft): Perforation Depth ND (ft): Tubing Size: Tubing Grade: Tubing MD (ft): 9161' - 9384' 8837' - 9049' 3 - 1/2 ", 9.3# x 9.2# L - 80 8765', 9353' - 9363' Packers and SSSV Type: 9 - 5/8" x 4 - 1/2" Baker S - Packer Packers and SSSV 8638' / 8344' 9 - 5/8" x 4-1/2" Baker SAB -3 Packer MD (ft) and ND (ft): 8684' / 8384' 7" x 3 -1/2" Otis WD Packer 9353' / 9019' 12. Attachments: 13. Well Class after proposed work: ® Description Summary of Proposal ® BOP Sketch ❑ Detailed Operations Program ❑ Exploratory ❑ Stratigraphic ® Development ❑ Service 14. Estimated Date for 15. Well Status after proposed work: Commencing Operation: August 1, 2013 ❑ Oil ❑ WINJ ❑ WDSPL ❑ Plugged 16. Verbal Approval: Date ❑ Gas ❑ GINJ ❑ GSTOR ❑ Abandoned Commission Representative: ❑ WAG ❑ SPLUG _� Suspended • 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact: Nathan Sperry; 564 -4258 Printed Name: Jo c II Title: Engineering Team Leader Email: Nathan.Sperryacbp.com Signa . - Phone: 564 - 4711 Date: (c.�4, Commission Use Only (((( Con. • s of approval: Notify Commission so that a representative may witness 31 ... Sundry Number: A ❑ Plug Integrity LI BOP Test ❑ Mechanical Integrity Test ❑ Location Clearance Other: 8 o fes f- f-a 35-2)fl p s c l AI 1 - ere) 4,�'� p1v plet Cew► rkli- Gcpprevt"d p t t'" .2d �1A 2S, H Z ` / Spacing Exception Required? 0 Yes No Subsequent Form Required: /0 — 46 POEMS JUN 2 6 201 9 APPROVED BY Approved By: / CO MMISSIONER TH COMMISSION Date: 2� - � B Form 1 3 q �1 i`` Approved application is valid for 12 months from the date of approval Submit In Dupli 11 cate ` 7 H � (p / � e73 �// -7 • • To: Alaska Oil & Gas Conservation Commission From: Nathan Sperry biD CTD Engineer Date: June 3 2012 Re: W -18 Sundry Approval Sundry approval is requested to plug the W -18 perforations as part of the drilling and completion of proposed W -18A coiled tubing sidetrack. History and current status: W -18 was completed in 1988. It is a high water -cut well. Serious water breakthrough seems to have occurred in 2008 -2009. This well is no longer economic and there are no • remaining well work options. Proposed plan: Sidetrack W -18 to the W -18A location using Nordic 2 Coiled Tubing Drilling rig on or around September 1st, 2013. The W -18A sidetrack will exit the existing 7" liner and kick off in the Shublik formation and land in Zone 4. This sidetrack will be completed with a 2 -3/8" 13Cr liner and cemented in place. This Sundry covers plugging the existing W -18 perforations via the W -18A primary liner cement lob and a liner top packer if the liner lap pressure test fails (alternate plug placement per 20 AAC 25.112(i)). The following describes work planned and is submitted as an attachment to Form 10 -403. A schematic diagram of the proposed sidetrack is attached for reference. `prods ce o � 12 p '4/' iafif T'i i k.e, // S C 04 cv/. u✓4 / � a f/ lt0 o % ea/ ro le fS -Mali /SO BD /� ' set k ,, 'f4 q t4.1 ih P ")- (91e- 93-% . Afterrif cycie rye e l 441,e 1i v c/). - it 'Me ,f c j. 1G cc elf f,/, trg /fie we /l f‘ di q/4... 6 .'( i , l lo v-CO'/ Cec0 vtz �%O� l %�s 1 00` 1, p e 8f t6 fao/' 41i7-eY • • Required Permit? Pre -Rig Work (scheduled to begin August 1 2013) 10-403 PTD 1. F Load and kill well. No No 2. C Pump 33bbls 17.0 ppg cement plug. Clean out to 8753' MD. No No 3. S Run a 2.75" drift to tag TOC at 8,753' MD. No No 4. F MIT -T to 2,000 psi. Wait 24hrs for cement to set. No No 5. V PT MV, SV, WV. No No 6. 0 Remove wellhouse and level pad. No No Required Permit? Rig Work (scheduled to begin September 1 2013) 10-403 PTD 1. MIRU and test BOPE 250 psi low and 3,500 psi high. Yes No 2. Drill 2.75" pilot hole from TOC to 9,130' (40' rat hole). No No 3. Caliper pilot hole using PDC logging conveyed on coil. No No 4. Set 3- 3/16" packer whipstock at 9,080' MD. No No 5. Mill 2.74" window at 9,080' and 10' of rathole. No Yes 6. Drill build: 3.25" OH, 617' (34 deg DLS planned). No Yes 7. Drill lateral: 3.25" OH, 1405' (12 deg DLS planned). No Yes 8. Log with OH triple combo. No Yes 9. Run 2 -3/8" 13Cr -80 liner leaving TOL at -8,740' MD. No Yes 10. Pump primary cement job: 14 bbls, 15.8 ppg, TOC at -8,740' MD. Yes* Yes 11. Perform liner cleanout. No Yes 12. Test liner lap to 2400 psi. No Yes 13. Perforate liner based on log interpretation (-1000'). No Yes 14. Freeze protect well to 2500' MD. No Yes 15. Set BPV; RDMO. No Yes * Approved alternate plug placement per 20 AAC 25.112(i) Post -Rig Work: 1. Re- install wellhouse, flowline and pull BPV. 2. Set GLV's. 3. Set liner top packer with slickline as needed if failed liner lap pressure test in Rig Work step 12 above. 4. ASRC flowback/well test. Nathan Sperry CTD Engineer 564 -4258 CC: Well File Joe Lastufka TREE = 4 -1/16" 5M CM/ • SA. NOTES: WT3LFEAD= MCEVOY AC W 8 . ACTUATOR= KB. aEV = 82.38' BF. E3EV = 54.34' KOP= 51 TT Max Angle = 24° 8249' I 1 2134' 1-1 3 -1 /2" HES X NP, D = 2.750" Datum MD = 9208' Datum1VD= 8800' SS GAS LIFT MANDRELS ST MD ND DU TYPE VLV LATCH PORT DATE 13 -3/8" CSG, 72#, L -80, D = 12.347" --1 2663' 6 3341 3341 0 FM-I0 DMY RK 0 12/13/12 5 4846 4846 1 FM-IC) DMY RK 0 12/13/12 4 5868 5830 24 FM-10 DMY RK 0 12/13/12 3 6796 6655 24 FM-11:3 DMY RK 0 12/13/12 2 7655 7443 24 FM -I0 DMY RK 0 05/18/09 1 8573 8283 22 FM-IO DMY RK 0 05/18/09 Minimum ID = 2.750" @ 2134' 3 -112" HES X NIPPLE I I 8629' — 13-1/2" HES X NP, D= 2.750' I ,= 8638' H9-5/8" X 4 -1/2' BKR SAB-3 F4(R, D = 3.875" 1 ' Z .441 8660' H13 -1/2' HES X NP, D = 2.750' I 8660' F- 3-12' PX PLUG (12/11/12) I 8682' I- 13 -1/2" BKR SEAL ASSY W/O SEALS, D = 3.001" I Z Ml 8684' — 19 -5/8" X 4 -1/2' BKR SA B-3 PKR, D = 3.99" II • 8732' I— 3 -1/2' SWS NP, D = 2.750' TOP OF 7" LW? H 8736' I g ' El 8753' 1- 13 -1I2" SWS NP, D = 2.750" I3 -12' TBG, 9.2 #, L -80, .0087 bpi, D 2.992' 1 -765' --�, II 8765' H3 -11 ' WLEG I 9 -5/8" CSG, 47 #, NT -80S, D = 8.681' IH 9003' _■.3. 1 8770' H ELAC TT LOGGED 03111/93 PERFORATION SUMANIRY REF LOG: BI-C-GR ON 11/25/88 I ANGLE AT TOP PERF: 18° @ 9161' Note: Refer to Production CB for historical pert data I SIZE SFF INTERVAL Opn/Sqz DATE 2" 6 9161 - 9171 0 0620/09 2' 6 9176 - 9181 0 06/20/09 I 2" 6 9188 - 9198 0 0620109 2-1/2' 6 9210 - 9230 0 08/08/03 ' 2-1/2' 6 9225 - 9260 0 09/03/96 5' 4 9268 - 9288 0 11/29/88 ' 5" 4 9292 - 9317 0 11/29/88 5" 4 9320 - 9330 0 11/29/88 ' 5' 4 9339 - 9350 0 1129/88 5" 4 9359 - 9364 S 11/29/88 4" 4 9374 - 9384 C 11/29/88 ►j 1 9353' I�X 3-1/2" OTiS WD R(R, D = _? I 5" 12 9405 - 9410 S 1129/88 '1 *' 1 9362' — FISH - (2) 4" X 2.5" FIR RUBBER 1 ►� a 9362' H 3 -12' OT1S X NP, D= 2.750" I I TOP OF 3 TBG —I 9353' 9362' H 3-1/2' XX PLUG SET 1 13 -12" TBG, 9.3#, L -80, .0087 bpi, D = 2.992" -[ 9363' I I 1 9363' —I3 1/2' PARKER WLEG, D = 2.992" 1 9396' Hr cEMENI RETAI'JH I PBTD --1 9432' AWAW ( 7' LNR, 26#, L -80, U4S, .0383 bpi, D = 6.276 " — 9550' 1.0.0.4.4.4.4 DATE REV BY COMhUJTS DATE REV BY COMMENTS PRU)1OEBAY LMT 11128/88 SA ORIGINAL COMPLETION 06/28/09 KJB/TLH ADPEW (06/20/09) WELL: W-18 07114/00 RWO 12/18/12 SI /JMD SET PLUG/GLV GO (12/11- 13/12) PERMTT No: 1881280 11/02/01 RWTP CORRECTIONS AR No: 50- 029-21880 -00 08/08/03 BJMrTL.P ADPERF SEC 21, T11N, R12E, 731' FNL 8 1182' FEL 01/05/05 LWB/TLP MANDREL TVDCOf .CT1ONS 05/31/09 SEW/TLH GLV CIO (05/18/09) BP Exploration (Alaska) TREE _ /16" SM GW • W _ 1 8 SAa NOTES: W�LHFAD= MCEVOY V V (� ACTUATOR= ? KB 8 EV = 823x' Planned Pre -Rig BE ELEV = 54.34' KOP = 51 Max Angle = 24 @ 8249' I 2134' H 3 -1/2" HES X , ID = " Datum MD = 9208' Datum TVD = 8800' SS GAS LIFT MA NP N 2.750 S ST MD ND DEV TYPE VLV LATCH PORT DATE 13-3/8" CSG, 72#, L -80, ID= 12.347" - I 2663' I 6 3341 3341 0 FM-10 DOME RK 12 05/18/09 5 4846 4846 1 FMHO DOME RK 16 05/18/09 4 5868 5830 24 FM-10 DOME RK 16 05/18/09 3 6796 6655 24 FM-10 SO RK 20 05/18/09 2 7655 7443 24 FM-10 DMY RK 0 05/18/09 1 8573 8283 22 FMHO DMY RK 0 05/18/09 Minimum ID = 2.750" @ 2134' 3 -112" HES X NIPPLE ' I 8629' - -I 3 -1/2" HES X MP, D = 2.750" 8638' H 9-5/8" X 4-1/2" BKR SAB-3 PKR, D = 3.875" I ' I 8660' H 3 - 1/2" HES X MP, D = 2.750" r 8682' H 3 - 1/2" BKR SEAL ASSY W/O SEALS, ID = 3.001" I z ■ 8684' H 9 -5/8" X 4 -1/2" BKR SAB-3 PKR, ID = 3.99" ' 8732' I— 3 -1/2" SWS MP, D = 2.750" TOP OF 7" LNR - 8736' I 8753' I — 3 -1/2" SWS NIP, D = 2.750" I3 -1!2" TBG, 9.2#, L -80, .0087 bpf, D = 2.992" H 8765' / 8765' — 3 - 1/2" WLEG 9 -5/8" CSG, 47 #, NT -80S, D= 8.681" H 9003' Y' 8770 I -I TT LOGGED 03/11/93 PERFORATION SUMAA RY REF LOG BHC -GRON 11/25/88 ANGLEAT TOP FERF: 18 @ 9161' Note: Refer to Production DB for historical pert data SCE SPF INTERVAL Opn /Sqz DATE 2" 6 9161 - 9171 0 06/20/09 2" 6 9176 - 9181 0 06/20/09 2" 6 9188 - 9198 0 06120/09 - 2 -1/2" 6 9210 - 9230 0 08/08/03 - _' 2 -1/2" 6 9225 - 9260 0 09/03/96 5" 4 9268 - 9288 0 11/29/88 5" 4 9292 - 9317 0 11/29/88 5" 4 9320 - 9330 0 11/29/88 5" 4 9339 - 9350 0 11/29/88 5" 4 9359 - 9364 S 11/29/88 4" 4 9374 - 9384 11/29/88 _ 9353' H7" X 3 OTIS WD PKR, D = _? 5" 12 9405 - 9410 S 11/29/88 lib 9362 —) FISH - (2) 4" X 2.5" PKR RUBBER I R� 9367 IH 3 -1 /2" OTIS X NP, D = 2.750" I TOP OF 3-1/2" TBG — 9353' 9367 H 3 -1 /2" XX PLUG SET 13-1/2" TBG, 9.3#, L -80, .0087 bpf, 13 = 2.992" H 9383' 9363' H3 PARKER WLEG, D = 2.992" I 9396' H 7" CEMENT RETAINER PBTD — 9432' PAVAVAVAVATAVAVAI 7" LNR, 26#, L -80, IJ4S, .0383 bpf, D = 6.276" H 9550' , "" DATE REV BY COMMENTS DATE REV BY COMMNTS FRUDHOEBAY LNT 11!28!88 SA ORIGINAL COMPLETION 06/28/09 KJB/TLH ADP (06/20 /09) WE.L: W-18 07/14/00 R.NO PEAK No: 1881280 11/02/01 RNITP CORRECTIONS AR No: 50 -029- 21880 -00 • 08/08/03 BJM91LP ADFERF SEC 21, T11N, R12E, 731' FA L 81182 FEL 01/05/05 LWBf11.P MANDREL TVD OORRE-- CT1ONS 05/31/09 SEW/TLH GLV C/O (05/18/09) BP Exploration (Alaska) NORDIC CTD RIG# 2 CHOKE / REEL / CIRCULATION MANIFOLD DIAGRAM liammt Choke Pine! Standpipe 2" Circulation Line �� • , M M 11 Driller Gauge • � . , M 10 . . MM 8 MM 9 Manual Choke CIRCULATING MANIFOLD — _ , MM 20 v ev im M M 22 fir• •e q SLB Transduc _ • MM 6 7 -1116" 5kpsi BOP In um — - PVT Sensor — Air Blow down - • • MM • Blind Shears Line .• ' - = r r t • Baker Choke a. � � I M r MM 15 MM MM5 _ _ MM21 SAS BUS w 2" Combi TOT __ .� ... i is • - . Kill Line P/S • i Rev Cir Line � II w I — . __ - t ..-t • k _ MM 12 • • M. MM14 M g ° rnn s .n MM MM ; 1ab,... F waw r 0.,'�k, al .- m cro :: - : ; :11. BOP 24 i 'Ill' - � III 3 Coiled Tubing — 4 1. 2 -318" Combi Ba er Choke " 2" Combi TOT • MM 1 , ; MP1 in ••• MM 13 I _ } 1- Kill Line - Outlet 4— Cement Line to Ground Mud • 2 in V "• Pu...5 In ,,,. Tranducers COILED TUBING / Choke Line CIRCULATING SYSTEM Cellar " / HP3 Area - .. . - ' . , # =+ I "es 40 HP 14 To Inner Reel Outlets Valve J HP7 — HP 2 HP 1 .:. • HP 1 . • cement line N2 ( SLB NORDIC'S 2 I Circulate Manifold • • CHOKE MANIFOLD in Cellar - all - P11 N2TriFlow / CM85 C1 $ . Gauge /1 8 1 . � * 4 -I r, Test Pump Inlet — -- -- C) CM3 :. ♦, ; J HDI Gauge CM18 - '� • Flow f/ HC se ° T^ TT « :. 4Way Block CM14 CM1 CM8 2 - To PITS • V C e CM5 CM6 CM11 CM 16 Baker Choke Line I,o' Baker Choke Line from wall ace I BAKER CHOKE LINE CM13 , . ' CM7 I i : — Baker Choke Line ::: = CM19 """ Mi CM 26 CM 29 Motion CM20 CM21 M — a�MARV F CM 30 CHOKE LINE CM 75 CM10 - 44 :1 Tige Tank CM 25 ; Outside • •,==. ■ Page 1 of 1 Subject: FW: INTENT PLUG for RE -DRILL WELLS: Corrected From: Davies, Stephen F (DOA) Sent: Monday, February 08, 2010 10:52 AM To: Foerster, Catherine P (DOA); McMains, Stephen E (DOA); Schwartz, Guy L (DOA); Saltmarsh, Arthur C (DOA); Aubert, Winton G (DOA) Subject: RE: INTENT PLUG for RE -DRILL WELLS: Corrected Revised procedure with an additional step per Cathy's comment: INTENT PLUG for RE -DRILL WELLS ( IPPRD) Type Work Code in RBDMS 1. When a Form 10 -403 is submitted requesting approval to plug a well for redrill, the initial reviewer (Art j or Steve D.) will check to make sure that the "Plug for Redrill" box in the upper left corner of the 403 / form is checked. If the "Abandon" box is checked, we will cross that erroneous entry out and initial it on both copies of the Form 10 -403 (AOGCC's and operator's copies). 2. On the Form 10 -403 if "Abandon" is checked in Box 15 (Well Status after proposed work), Art or Steve D. will cross that erroneous entry out and initial it on both copies of the Form 10 -403 (AOGCC's and ✓ operator's copies). Instead, we will check the "Suspended" box. Guy and Winton will serve as quality control for steps 1 and 2. 3. When Steve McMains receives the Form 10 -403 with a check in the "Plug for Redrill" box, he will enter the existing code "IBPRD" into RBDMS. This code automatically generates a comment under the History tab stating "Intent: Plug for Redrill." 4. When Steve McMains receives any Form 10 -407, he will check the History tab in RBDMS for this comment. If he sees the "Intent: Plug for Redrill" code, and cannot find any evidence that a subsequent re -drill has been COMPLETED, he will assign a status of SUSPENDED to the well bore in RBDMS, no matter what status is listed on the 10 -407. Steve will also change the status on the 10 -407 form to SUSPENDED, and will date and initial his change. If Steve does not see the "Intent: Plug for Redrill" comment or code, he will enter the status listed on the Form 10 -407 into RBDMS. 5. When the Form 10 -407 for the redrill is received, Steve M. will change the original well's status from suspended to abandoned. 6. The first week of every January and July, Steve M. and Steve D. will check the "Well by Type Work Outstanding" user query in RBDMS to ensure that all of the Plug for Redrill wells have been handled properly. At this same time, Steve M. and Steve D. will also review the list of suspended wells for accuracy. Thanks, Steve D. file: //F: \Daily Document Record \Procedures_Instructions \FW INTENT PLUG for RE- DRI... 4/6/2012 Z2-5t O 0 0 • I 0000000000000000000 U U U U O O O O O O O U O U U r, O H 0 '" I t O • .� U V) . ks C, 0 t?t Z > N .sa () V) .-( � i. V+ a) {Jr m al e u N CD TA L > In 00 r'✓ . F Z ED E tri Cl)0 •Di f' ;.a 0 CT IA 0 la r- (.l c N Y (13 m I:. . M M M M M M M M M M M N N cM N N M M M .. N O I '=O r e- c- r r r r on �NJ r r r r r W C�) I.J.! L ` L L C Q .Q U U C C r L L M r a l7 l0 lC fC fa y y y N N t0 t0 V C2 O. d S O xal al ri U 2 2 2 2 7 LL -) LL -) ' 1 0 0 7 7 O a a LL " L wd O O 1- CO CO O co N r- ■In O N fn C V V .-J rP. H a M N N N N N N CO a-.. N r- N M N r X d • r' CL 1 t , O O � O 0 N J R °f O > a C:`, X LL W LL LL CC LL } W CC W/' ce a' re d' ~ ce J E j ce F- X _ 0 m as OU a a J w as a w n ca 0? 3 ce re ce u.1 cc re cn to cc -) --- m N J -J -100 -1000 (10. 0 -1 -1 ., J J Ca z i_ z z 2 2 z 2 a 2 2 z z 2 z z z z U u) O O W W O W w W W m m W O O 7) U O n 0 M Co e - . M -! H Q Dl . i,Q X X X X X X X X X M p ) N I ei to N X X X X X X X X X X iii Z O H ex O H pig Ca CD CD I 7 J i.. N d. w M r) co o m •- n CD cc pp o co r CV M CO Ce N n O M 01 r in M p n O Cn W r o CO n p co II) CG Z p r o O N r r O pa- a+ p 0 ° ° ° 0000 p O o O O O O O p O >- .OC p o 0 0 p O O O W O 0 ° 0 ° 00000 a C O O O O O O 0 w ° m E X ) X m n d N p p . .- a LL in Ln U Ln in in v co o 'm CO U U U U U U U a U CO U U m m m U U CO cc O I ' � i sn > C11 QD N m n m Cn Cn r ro C1 CT) I v Q rn w m a 0 m CO W J U o O r m N m m J m a m N 0 v cu @ ai v r n C to N n r fn NO M p In n Y oc Q1 O o r r N r 1- N Cr N J CO M = z 13 ' z C'J Z 4 c t9 c a coo N ,N 3 J 00 • a c w O u m -c 2 - (-7 0 0 N r w w if1 .>_ . d O U N N '1 cc N U ion• o CO3 ? N Lr) a �� _.. I k. .... X a CO rn a 03/08/11 Schlumberger NO. 5701 Alaska Data & Consulting Services Company: State of Alaska 2525 Gambelt Street, Suite 400 Alaska Oil & Gas Cons Comm Anchorage, AK 99503 -2838 Attn: Christine Shartzer ATTN: Beth 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Well Job # Log Description Date BL Color CD W -202 BMSA -00004 MDT ' /() — ) 3 01/22/11 WO 1 1 W -202 BMSA -00005 ISOLATION SCANNER (USIT1 ) —' a3 01/30/11 a d 1 1 V -02 BL65 -00016 SCMT an - 02/01/11 1 1 y_ €1. --r A -39A BL65 -00018 MEM DEPTH CORRELATION 0 — °) 02103111 1 -o- 1 J -17C BAUJ -00061 MEM PROD PROFILE 4 0 - Cl ic 02/09111 1 �—I9a 1 18 -13C AWJI.00128 MEMORY CBL :din _ / co 02/10/11 — :j 1 1 R -12 BBKA -00087 PRIMARY DEPTH CONTROL LOG /* — t73.1 02/18/11 1 ° 3 1 D -21 BG4H -00036 1 PRODUCTION PROFILE �`- - 02120/11 1 1 W -18 BJOH -00010 PRODUCTION PROFILE te�I+!j 02/13/11 1 1 H -20 BBSK -00051 PRODUCTION PROFILE ,' ' •" �. .-.30- 02/1 02/11/11 1 - Q 1 P2-52 BCRD -00082 SCMT (q - _ Q ( 02/10 /11 gole3 4 1 1 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO: BP Exploration (Alaska) Inc. Alaska Data & Consulting Services Petrotechnical Data Center LR2 -1 2525 Gambell Street, Suite 400 900 E. Benson Blvd. Anchorage, AK 99503 -2838 • S k4 94 410ED MAR 3 . 5 `1011 F r '� w MAR 142.011 Anchroxv- �' Awriopei, , fit ,.; i 4 STATE OF ALASKA ALAS IL AND GAS CONSERVATION COMMI ON REPORT OF SUNDRY WELL OPERATIONS . ~-.~~2~ 1. Operations Abandon ~ Repair Weil ~ Plug Perforations ~ Stimulate ~ Other ~ Performed: Alter Casing ~ Pull Tubing ~ Perforate New Pool ~ Waiver [~ Time Extension ~ Change Approved Program ~ Operat. Shutdown ~ Perforate Q Re-enter Suspended Weil ~ 2. Operator BP Exploration (Alaska), Inc. 4. Current Well Class: 5. Permit to Drill Number: rvame: De~lopment ~ Exploratory ~ ~ss-~2so 3. Address: P.O. Box 196612 Stratigraphic ~ Service ~ 6. API Number: Anchorage, AK 99519-6612 50-029-21880-00-00 7. KB Elevation (ft): 9. Weil Name and Number: 82 KB PBU W-18 8. Property Designation: 10. Field/Pool(s): ADLO-028263 PRUDHOE BAY Field/ PRUDHOE OIL Pooi ; _. _... .. _ ... 11. Present Well Condition Summary: Total Depth measured 9550 feet Plugs (measured) 9382 true vertical 9205.81 feet Junk (measured) 9361 Effective Depth measured 9362 feet ~~~'p'~~~~~4'' ~U~ ~~ 2~~ ~ true vertical 9028 feet Casing Length Size MD ND Burst Collapse CONDUCTOR 80 20" 91.5# H-40 31 - 111 31 - 111 1490 470 LINER 814 7" 26# L-80 8736 - 9550 8435 - 9206 7240 5410 LINER 10 3-1/2" 9.3# L-80 9353 - 9363 9019 - 9029 10160 10530 PRODUCTION 8974 9-5/8" 47# NT80S 29 - 9003 29 - 8687 6870 4760 SURFACE 2633 13-3/8" 72# L-80 30 - 2663 30 - 2663 4930 2670 Perforation depth: Measured depth: SEE ATTACHED - _ _ _ _ True Vertical depth: _ _ _ _ _ Tubing: (size, grade, and measured depth) 3-1/2" 9.3# L-80 20 - 8765 0 0 - Packers and SSSV (type and measured depth) 3-1/2" Baker S-3 Packer 8638 4-1/2" Baker SAB-3 Packer 8684 3-1/2" Otis WD Packer 9353 0 12. Stimulation or cement squeeze summary: Intervals treated (measured): ,~~„~N ~ ~ ~Q(~~ Treatment descriptions including volumes used and final pressure: ~k~ ~S~ ~~~g ~q~t~. ~aQ~lOti ~~~~~ ~ 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing pressure Prior to well operation: 394 746' 2411 309 Subsequent to operation: 14. Attachments: 15. Well Class after proposed work: Copies of Logs and Surveys Run Exploratory ~~ De~elopment ~ S211AC8 ~ Daily Report of Well Operations X 16. Well Status after proposed work: Oil ~ Gas ~ WAG ~ GINJ ~ WINJ ~ WDSPL ~ 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt: N/A Contact Gary Preble Printed Name Gary Preble, Title Data Management Engineer Signature ,,~, .-- Phone 564-4944 Date 6/26/2009 Form 10-404 Rev' ed 04/2006 '~ -- ~~~J~ ~~ Z~OQ ~ Submit Original Onty ~~ ~ ~ ~~~ ~-r W-18 188-128 PERF ATTACHMENT C~ r1 U Sw Name Operation Date Perf Operation Code Meas De th Top Meas Depth Base Tvd De th Top Tvd Depth Base W-18 11/29/88 PER 9,268. 9,288. 8,938.72 8,957.66 W-18 11/29/88 PER 9,292. 9,317. 8,961.45 8,985.11 W-18 11/29/88 PER 9,320. 9,330. 8,987.95 8,997.4 W-18 11/29/88 PER 9,339. 9,344. 9,005.92 9,010.65 W-18 11/29/88 PER 9,359. 9,364. 9,024.84 9,029.57 W-18 7/31/90 APF 9,405. 9,410. 9,068.38 9,073.11 W-18 8/1I90 SQZ 9,405. 9,410. 9,068.38 9,073.11 W-18 8/1/90 SQZ 9,359. 9,364. 9,024.84 9,029.57 W-18 8/1/90 SQZ 9,339. 9,344, 9,005.92 9,010.65 W-18 8/1/90 SQZ 9,292. 9,317. 8,961.45 8,985.11 W-18 8/1/90 SQZ 9,268. 9,288. 8,938.72 8,957.66 W-18 8/1/90 SQZ 9,320. 9,330. 8,987.95 8,997.4 W-18 8/2/90 RPF 9,320. 9,330. 8,987.95 8,997.4 W-18 8/2/90 RPF 9,339. 9,344. 9,005.92 9,010.65 W-18 8/2/90 RPF 9,292. 9,317. 8,961.45 8,985.11 W-18 8/2/90 APF 9,374. 9,384. 9,039.04 9,048.5 W-18 8/2/90 APF 9,344. 9,350. 9,010.65 9,016.32 W-18 8/2/90 RPF 9,268. 9,288. 8,938.72 8,957.66 W-18 10/10/91 BPS 9,382. 9,387. 9,046.61 9,051.34 W-18 9/3/96 APF 9,225. 9,260. 8,897.98 8,931.14 W-18 9/22/01 FIL 9,337. 9,410. 9,004.03 9,073.11 W-18 7/26/02 FIL 9,356. 9,384. 9,022. 9,048.5 W-18 8/8/03 APF 9,210. 9,230. 8,883.77 8,902.71 W-18 8/8/03 FIL 9,356. 9,410. 9,022. 9,073.11 W-18 6/20/09 APF 9,176. 9,181. 8,851.56 8,856.3 W-18 6/20/09 APF 9,161. 9,171. 8,837.33 8,846.81 W-18 6/20/09 APF 9,188. 9,198. 8,862.93 8,872.4 AB ABANDONED PER PERF APF ADD PERF RPF REPERF BPP BRIDGE PLUG P ULLED SL SLOTTED LINER BPS BRIDGE PLUG SET SPR SAND PLUG REMOVED FCO FILL CLEAN OUT SPS SAND PLUG SET FIL FILL SQF SQUEEZE FAILED MIR MECHANICAL ISOLATED REMOVED SQZ SQUEEZE MIS MECHANICAL ISOLATED STC STRADDLE PACK, CLOSED MLK MECHANICAL LEAK STO STRADDLE PACK, OPEN OH OPEN HOLE ~ s W-18 DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS EVENT SUMMARY FLUIDS PUMPED BBLS 1 diesel 3 METH 4 Total 04/14/09 5chlmher~er Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 Anchorage, AK 99503-2838 ATTN: Beth N0.5188 Company: State of Alaska Alaska Oil & Gas Cons Comm Attn: Christine Mahnken 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Well _b.-. r ~,__ s :i~:l ';nt>'~ a. :,. , >_rst`,,e4~~s~ , OWLEDGE RECE _, BP Exploration (Alaska) Inc. ~. - °-- Petrotechnical Data Center LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99508 Date- Delivered: W-18 11968978 RST -( Vi7lC 12/22/08 6L 1 color cu 1 07-02B AXED-00013 MCNL - 02/12/09 1 K-05C AWJB-00016 MCNL ~ ~l 12/30/08 1 1 F-18A AYLF-00020 CEMENT IMAGE LOG ~ ( ~- 03/19/09 1 1 J-09A AP3O-00024 STP CROSS FLOW CHECK ~ / ~ 03/25/09 1 1 X-05 AYTO-00014 PFCS CALIPER LOG ) _ C 04/09/09 1 1 O-04A AYTU-00023 LDL & PLUG SET j~`Jr- _~ 04/02/09 1 1 04-40 AYTU-00025 USIT ~ ~ ~- 04/10/09 1 1 06-146 AVYO-00021 SCMT _ ~- 04/01/09 1 1 Z-01 B AVYO-00025 INJECTION PROFILE - /p ~~ 04/11/09 1 1 L3-15 AYTU-00023 - ~ _ PRODUCTION PROFILE - ~ 04/06/09 1 1 11-30 AXBD-00021 MEM PROD PROFILE j c(_ °~~ 04/14/09 1 1 3-03/J-33 AZ4D-00013 RST W/INJ PROFILE - / ~ • - ~ a 04/05/09 1 1 3-17F/K-30 BIJJ-00006 MEM INJECTION PROFILE - (~ / 04/03/09 1 1 3-49A/M-40 AXBD-00019 MEM INJECTION PROFILE: 04/07/09 1 1 V-114A AVY500032 INJECTION PROFILE -- j~~hb 04/02/09 1 1 L --- - - THESE 2 WELLS WERE DELIVERED SEPARETLY TO MEET COMPLIANCE TRANS # 5185 E-36A AYTU-00006 OH MWD/LWD EDIT (IFLEX) j _©~- ~-~9 01/14/09 1 1 MPS-43 AXML-00020 OH LDWG EDIT 12/29/06 2 f PLEASE ACKN IDT RV Clr_NII GIA n~~n o~ru~r.ue~n nur .....,.. ~.......... Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 Anchorage, AK 99503 838 ATTN: Beth Received by: ~, ,.. ~~r~~~~~61 ~~~ Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 Anchorage, AK 99503-2838 ATTN: Beth ~'`r Alaska Data & Consulting Services 1 2525 Gambell Street, Suite 400 Anchorage, AK 99503-2838 ATTN: Beth Date Delivered: Received by: i i. .tea'!, i:ar~.s~l ,~t-~I~'t ~~~~ NO. 5020 Company: State of Alaska Alaska Oil & Gas Cons Comm Attn: Christine Mahnken 333 West 7th Ave, Suite 100 Anchorage, AK 99501 12/29/08 Well Job # 4-20/M-35 Lo Descri tion Date gL 12014059 STATIC SURVEY/PERF Color CD W-18 11968978 PRODUCTION PROFILE 12/11/08 1 1 Y-07A 12103704 INJECTION PROFILE ~ 12/20/08 1 P2-35 12031533 SCMT 12/18/08 1 1 M-16 12111931 SCMT _ r L~ 12/18/08 1 1 P2-15A 40015006 OH MWD/LWD EDIT 12/19/08 1 1 P2-i5APB3 40015006 OH MWD/LWD EDIT ~ _ ~`~ 04/01/07 2 1 P2-15AP62 40015006 OH MWD/LWD EDIT ~ ~ 03/27/07 2 ~ ~~'- ~ OD 03/24/07 2 1 P2-15AP61 40015006 OH MWD/LWD EDIT 1 W-31A 40017846 OH MWD/LWD EDIT ~~ I 03/22/07 2 1 W-29 11549353 CH EDIT (USIT) - ` _ ~ ~ 09/27/08 2 1 H-05A AXBD-00002 MCNL _ 12/18/05 1 11/20/08 1 1 f! PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO: BP Exploration (Alaska) Inc. Petrotechnical Data Center LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99508 • ) STATE OF ALASKA ) RECE\VED ALASKA OIL AND GAS CONSERVATION COMMISSION ~ \) 3 2005 REPORT OF SUNDRY WELL OPERATION~ . Cons commission 1. Operations Performed: _,Maske 0" &. Gas AbandonD Repair WellD PluQ PerforationsD Stimulate 00 - ~nchOløaED Alter CasingD Pull TubingD Perforate New PoolO WaiverD Time ExtensionD Change Approved ProgramD Operation Shutdown 0 Perforate 0 Re-enter Suspended WellD 2. Operator Name: 3. Address: BP Exploration (Alaska), Inc. 4. Current Well Class: Development Œ] ExploratoryD 5. Permit to Drill Number: 188-1280 6. API Numbe 50-029-21880-00-00 P.O. Box 196612 Anchorage, Ak 99519-6612 7. KB Elevation (ft): 82.00 8. Property Designation: ADL-028263 11. Present Well Condition Summary: Stratigraphic 0 Service D 9. Well Name and Number: W-18 10. Field/Pool(s): Prudhoe Bay Field / Prudhoe Oil Pool Total Depth measured 9550 feet true vertical 9205.8 feet Effective Depth measured 9362 feet true vertical 9027.7 feet Plugs (measured) Junk (measured) 9362 9361 Casing Length Size MD TVD Burst Collapse CONDUCTOR 80 20" 91.5# H-40 31 111 31.0 111.0 1490 470 LINER 814 7" 26# L-80 8736 - 9550 8435.1 - 9205.8 7240 5410 LINER 10 3-1/2" 9.3# L-80 9353 - 9363 9019.2 - 9028.6 10160 10530 PRODUCTION 8974 9-5/8" 47# NT80S 29 - 9003 29.0 - 8687.3 6870 4760 SURFACE 2633 13-3/8" 72# L-80 30 - 2663 30.0 - 2662.9 4930 2670 Measured depth: 9210 - 9225,9225 - 9230,9230 - 9260,9268 - 9288,9292 - 9317,9320 - 9330,9339 - 9344 9344 - 9350, 9374 - 9382 True vertical depth: 8883.77 - 8897.98, 8897.98 - 8902.71,8902.71 - 8931.14,8938.72 - 8957.66,8961.45 - 8985.11,8987.95 - 8997.4 9005.92 - 9010.65, 9010.65 - 9016.32, 9039.04 - 9046.61 TubinQ ( size, Qrade, and measured depth): 3-112" 9.3# L-80 @ 20 8765 SCANNED MAY 11 2005 Packers & SSSV (type & measured depth): 3-112" Otis WD Packer 3-1/2" Baker S-3 Packer 4-1/2" Baker SAB-3 Packer @ 9353 @ 8638 @ 8684 12. Stimulation or cement squeeze summary: Intervals treated (measured): 9210' - 9382' Treatment descriptions including volumes used and final pressure: 138 Bbls 90:10 DAD Acid, 138 Bbls 9:1 Mud Acid @3671 psig Prior to well operation: Subsequent to operation: Oil-Bbl 314 516 Representative Daily Average Production or Iniection Data Gas-Met Water-Bbl Casing Pressure ~7 ~5 ~ 0.6 3509 50 Tubing Pressure 293 328 13 Copies of Logs and Surveys run _ Daily Report of Well Operations _ ! 15. Well Class after proposed work: Exploratory 0 16. Well Status after proposed work: OilŒJ GasD Development ŒI Service D 14. Attachments: Signature Garry Catron Garry Catron jj~ C,~. WAG D GINJD WINJD WDSPLD Prepared by Garry Catron (907) 564-4657. Sundry Number or N/A if C.O. Exempt: N/A 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Printed Name Title Production Technical Assistant Phone 564-4657 Date 4/28/05 Form 10-404 Revised 4/2004 ORIGINAL RBDMS 8Ft }.,~ f¡ \I I) .1 7005 ') ) W-18 DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS EVENT SUMMARY 02/27/05 CTU #5, ACID TREATMENT; MIRU CTU #5. SEVERAL HOURS OF STANDBY WAITING ON GOOD PTAND REPAIR OF HYDRAULIC PUMP ON COIL UNIT. MIRU CEMENT PUMP AND ACID TRANSPORTS TO ASSIST WITH TREATMENT. PUMP 250 BBLS OF AMMONIUM CHLORIDE (NH4CL) DOWN BACKSIDE TO COOLDOWN PERFORATIONS. PUMP TREATMENT DOWN COIL TO FORMATION IN 5 STAGES WITH 138 BBLS OF 90:10 DAD ACID, 138 BBLS OF 9:1 MUD ACID AND WAX BEAD DIVERTERS. START FINAL OVERFLUSH STAGE WITH NH4CL. CONTINUED ON WSR 02/28/05 ... 02/28/05 CTU #5, ACID TREATMENT; CONTINUED FROM WSR 02/27005... CONTINUE OVERFLUSH OF ACID TREATMENT WITH NH4CL. DISPLACE CT WITH 60/40 METHANOL. POOH. FREEZE PROTECT TO 2200' WITH 60/40 METHANOL. RDMO. NOTIFY ASRC THE WELL IS READY TO POP THROUGH PORTABLE TEST SEPARATOR. *** JOB COMPLETE ***. . JOB NOTES: PRE JOB INJECTIVITY WITH NH4CL WAS 1.8 BPM/592 PSIG. POST JOB INJECTIVITY WITH NH4CL WAS 2.0 BPM/765 PSIG. OBSERVED MODERATE PRESSURE RESPONSE (200 PSIG) FROM THE 1ST DIVERTER STAGE. OBSERVED SIGNIFICANT PRESSURE RESPONSE FROMR 3RD AND 4TH DIVERTER STAGES, 1000 AND 600 PSIG RESPECTIVELY. WHILE BREAKING OFF THE BHA AT AT SURFACE, RECOVERED A 4 FT CYLINDRICAL PLUG OF UNKNOWN SUBSTANCE FROM THE BHA STINGER. A 3" PLUG OF THE SAME SUBSTANCE WAS ALSO FOUND IN THE BIG HOLE (JSN) NOZZLE. A SAMPLE WILL BE TAKEN TO SLB LAB FOR ANALYSIS. FLUIDS PUMPED BBLS 60 60/40 Methonal 400 30/0 NH4CL 138 90: 1 0 DAD Acid 138 9: 1 Mud Acid 736 TOTAL Page 1 ,.TREE = ~ 4-1/16" 5M crw WELLHEAD = MCEVOY A CTUÄ fÒR; ? "','.....,·......·/'N""'^""""""..."'M"""""""...'NW"'^"""',...'/'N",...,~y,'''''.....,''',W''''"''NWW'I''' KB. ELEV = 82.38' ., ". "'''''','''' """"" BF. ELEV = 54.34' """""'''''''''''Hi'fY'''''""^""",""''''''''''''''''''''''''''NWW',~""""""'",,,",,",,,,'r'''''',",,,,,,,,'''''''''~NYIW'''''' KOP= 5177' ,Ma~§~~~~__·2·4~@}2~~~, Datum MD = 9208' .. .,,, ".."....""..",,,,, Datum TV 0 = 8800' SS ) W-18 ~ ~ I 13-3/8" CSG, 72#, L-80, 10 = 12.347" 1-1 2663' ~~ Minimum ID = 2.750" @ 2134' 3-1/2" HES X NIPPLE I TOP OF 7" LNR 1-1 8736' 13-1/2" TBG, 9.2#, L-80, .0087 bpf, 10 = 2.992" 1-1 I 9-5/8" CSG, 47#, NT-80S, 10 = 8.681" 1-1 8765' 9003' ÆRFORA TION SUMMARY REF LOG: BHC-GR ON 11/25/88 ANGLEATTOPÆRF: 19 @ 9210' Note: Refer to Produetion DB for historical perf data SIZE SPF INTERVAL Opn/Sqz DATE 2-1/2" 6 9210 - 9230 0 08/08/03 2-1/2" 6 9225 - 9260 0 09/03/96 5" 4 9268 - 9288 0 11/29/88 5" 4 9292 - 9317 0 11/29/88 5" 4 9320 - 9330 0 11/29/88 5" 4 9339 - 9350 0 11/29/88 5" 4 9359 - 9364 S 11/29/88 4" 4 9374 - 9384 0 11/29/88 5" 12 9405 - 9410 S 11/29/88 I TOP OF 3-1/2" TBG l-f 9353' 13-1/2" TBG, 9.3#, L-80, .0087 bpf, 10 = 2.992" 1-1 9363' I PBTD 1-1 9432' 17" LNR, 26#, L-80, IJ4S, .0383 bpf, 10 = 6.276" 1-1 9550' L I I I z Z---t ! \ : z Z---t I I ~ ~ I ¡ r---..t ~ I /~~ 5/ )v NOTES: 2134' 1-1 3-1/2" HES X NIP, 10 = 2.750" GAS LIFT MANDRELS ST MD TVD DEV TYÆ VLV LATCH 6 3341 3341 0 FMHO DOME RK 5 4846 4846 1 FMHO DMY RK 4 5868 5830 24 FMHO DOME RK 3 6796 6655 24 FMHO DMY RK 2 7655 7443 24 FMHO DOME RK 1 8573 8283 22 FMHO SO RK ~ 8629' 8638' 8660' 8682' 8684' 8732' 8753' 8765' 8770' 9353' 9362' 9362' 9362' 9363' 9396' REV BY SA DA TE REV BY COMMENTS 08/08/03 BJM'TlP ADD ÆRF 01/05/05 LWBITLP MANDREL TVD CORRECTIONS DATE 11/28/88 07/14/00 11/02/01 06/06/02 10/20/02 OS/28/03 RNlTP PJP/tlh PP/KA K MHITLP COMMENTS ORIGINAL COM PLETION RWO CORRECTIONS ÆRF CORRECTION ÆRF CORRRECTIONS GL V C/O PORT DATE 16 01/05/05 o 01/05/05 16 01/05/05 o 01/05/05 16 01/05/05 22 01/05/05 1-13-1/2" HES X NIP, 10 = 2.750" 1 ~19-5/8" X 4-1/2" BKR SAB-3 PKR, 10 = 3.875" t-13-1/2" HES X NIP, 10 = 2.750" 1 ~13-1/2" BKR SEAL ASSY W/O SEALS, 10 = 3.001" ~19-5/8" X 4-1/2" BKR SAB-3 PKR, 10 = 3.99" ~13-1 /2" SWS NIP, 10 = 2.750" 1 ~13-1/2" SWS NIP, 10 = 2.750" 1 t-13-1/2" WLEG 1 rl ELMO TT LOGGED 03/11/93 1 1-17" X 3-1/2" OTIS WD PKR, 10 = _? I 1-1 FISH - (2) 4" X 2.5" PKR RUBBER 1 1-13-1/2" OTIS X NIP, 10 = 2.750" I H3-1/2" XX PLUG SET 1 ~13-1/2" PARKER WLEG, 10 = 2.992" ~17" CEMENT RETA INER 1 PRUDHOE BA Y UNIT WB...L: W-18 ÆRMIT No: 1881280 API No: 50-029-21880-00 SEC 21, T11 N, R12E, 731' FNL & 1182' FEL BP Exploration (Alaska) : (STATE OF ALASKA ( ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations Performed: AbandonD SuspendD Operation ShutdownD Perforate ŒJ WaiverD OtherD Alter Casing 0 Repair Well 0 Plug PerforationsO Stimulate 0 Time ExtensionD Change Approved ProgramO Pull TubingO Perforate New Pool 0 Re-enter Suspended Well 0 2. Operator 4. Current Well Class: 5. Permit to Drill Number: Name: BP Exploration (Alaska), Inc. 188-1280 Development [!] Exploratory 0 3. Address: P.O. Box 196612 . 6. API Number Anchorage, Ak 99519-6612 Stratigraphic 0 Service 0 50-029-21880-00-00 7. KB Elevation (ft): 9. Well Name and Number: 82.00 W-18 8. Property Designation: 10. Field/Pool(s): ADL-028263 Prudhoe Bay Field 1 Prudhoe Oil Pool 11. Present Well Condition Summary: Total Depth measured 9550 feet true vertical 9205.8 feet Plugs (measured) 9362 Effective Depth measured 9362 feet Junk (measured) 9361 true vertical 9027.7 feet Casing Length Size MD TVD Burst Collapse Conductor 80 20" 91.5# H-40 31 - 111 31.0 - 111.0 1490 470 Liner 814 7" 26# L-80 8736 - 9550 8435.1 - 9205.8 7240 5410 Liner 10 3-1/2" 9.3# L-80 9353 - 9363 9019.2 - 9028.6 10160 10530 Production 8974 9-5/8" 47# NT80S 29 - 9003 29.0 - 8687.3 6870 4760 Surface 2633 13-3/8" 72# L-80 30 2663 30.0 - 2662.9 4930 2670 Perforation deoth: Measured depth: 9210 - 9225,9225 - 9230,9230 - 9260,9268 - 9288,9292 - 9317,9320 - 9330,9339 - 9344,9344 - 9350 True vertical depth: 8883.77 - 8897.98, 8897.98 - 8902.71,8902.71 - 8931.14,8938.72 - 8957.66,8961.45 - 8985.11,8987.95 - 8997.4 9005.92 - 9010.65, 9010.65 - 9016.32 Tubing ( size, grade, and measured depth): 3-1/2" 9.3# L-80 @ 20 - 8765 R E eEl VE D Packers & SSSV (type & measured depth): 3-1/2" Baker S-3 Packer @ 8638 1 2004 3-1/2" Otis WD Packer @ 9353 JAN 6 4-1/2" Baker SAB-3 Packer @ 8684 12. Stimulation or cement squeeze summary: Intervals treated (measured): Anchorage Treatment descriptions including volumes used and final pressure: 13 Reoresentative Dailv Averaae Production or Iniection Data Oil-Bbl Gas-Mef Water-Bbl Casina Pressure Tubing Pressure Prior to well operation: 275 0.26 497 1350 312 Subsequent to operation: 329 0.26 444 1600 333 14. Attachments: 15. Well Class after proposed work: Exploratory D Development ŒI Service D Copies of Logs and Surveys run - 16. Well Status after proposed work: Operational Shutdown D Oil]] GasO WAG 0 GINJO WINJD WDSPLO Daily Report of Well Operations. :K Prepared by Garry Catron (907) 564-4657. 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or NIA if C.O. Exempt: Contact Garry Catron NI A Printed Name Garry Catron Title Production Technical Assistant Signature L~ . Phone. 564-4657 Date 1/14/04 O..D ' r , ~~ 1 ^ 1 1\ 1&\~\J1Il;JI\\\I~i Form 1 0-404 Revised~MNE[~í IlJAN ~~ @ lOndf'. ~ ! .-" I, I ",', ~ .Jjln\ ~ . ( ( ~, W-18 DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS EVENT SUMMARY 07/24/03 DfT w/2.5 dmy gun, tel, sb no sample to 9351 08/08/03 Perforate interval from 92101-923016 SPF. Depth referenced to WA GR/CCL log dated Mar 1, 1993. Perforate with 2-1/2" PJ HSD guns, 60 deg random. Did not tag TD. FLUIDS PUMPED I BBLS :TOT AL I No Fluids Pumped 0 Page 1 ( ( TREE = 4-1/16" 5M CIW I SAFETY NOTES: I W8..LI-EAD = MCEVOY W 1 8 ACTUATOR = ? - KB. ElEV = 82.38' BF. ElEV = 54.34' KOP = 5177' Max Anç¡le = 24 @ 8249' 2134" 3-1/2" I-ES X NP, ID = 2. 75rJ' Datum MD = 9208' DatumTVD= 8800' SS GAS LFT tv\I\l\DRELS ST MD TVD DEV 1YÆ VLV LATCH FORT DAlE 13-3/8" CSG, 72#, L-80, ID = 12.347" 6 3341 3259 0 FMI-O DOM:: RK 16 09/23100 5 4846 4764 1 FMI-O DMY RK - 07/14/00 4 5868 5744 24 FMI-O DOM:: RK 16 09/23100 3 6796 6575 24 FMI-O DMY RK - 07/14/00 2 7655 7360 24 FMI-O DOM:: RK 16 09/23100 1 8573 8205 22 FMI-O SO RK 22 05128103 Minimum ID = 2.750" @ 2134' 3-1/2" HES X NIPPLE 3-1/2" HES X NIP, ID= 2.750" 3-1/2" HES X NIP, ID= 2.750" 3-1/2" BKR SEAL ASSY W/O SEALS.ID = 3.001" 9-5/8" X 4-1/2" BKRSAB-3 PKR, ID = 3.99" 3-1/2" SWS NIP,ID = 2.750" TOP OF 7' LNR 8736" 8753" 3-1/2" lBG, 9.2#, L-80, .0087 bpf, ID = 2.992" 8765" 9-5/8" CSG, 47#, NT-80S, ID = 8.681" I 8770" ÆRFORA TON SUMv1ARY REF LOG: BHCGR ON 11/25/88 ANGLE AT TOP PERF: 19 @ 9210' Note: Refer to Produetion DB for historieal perf data SIZE SA= NTERVAL Opn/Sqz DATE 2-1/2" 6 9210 - 9230 0 08/08/03 2-1/2" 6 9225 - 9260 0 09/03/96 5" 4 9268 - 9288 0 11/29/88 5" 4 9292 - 9317 0 11/29/88 5" 4 9320 - 9330 0 11/29/88 5" 4 9339 - 9350 0 11/29/88 5" 4 9359 - 9364 S 11/29/88 4" 4 9374 - 9384 0 11/29/88 5" 12 9405- 9410 S 11/29/88 7"X 3-1/2" OTISWDPKR, ID=___? FISH - (2) 4" X 2.5" A<R RUBBER -13-1/2" OllS X NIP, ID = 2.750" I I TOP OF 3-1/2" TBGI 3-1/2" XX PLUG SET 3-1/2" lBG, 9.3#, L-80, .0087 bpf, ID = 2.992" 7" CErÆNT REf AINER DA TE RBI BY CO Mv18'JTS DA lE REV BY COMMENTS PRUDI-OE BA Y UNIT 11/28/88 SA ORIGINAL COMPLETION 08108103 BJMffLP ADD ÆRF WELL: W-18 07/14/00 RWO PERMrr f\b: 1881280 11102101 RN/lP CORRECTONS AR f\b: 50-029-21880-00 06106102 PJP/th PERF CORRECTION SEC21, T11N, R12E, 731' FNL & 1182'FEL 10(2.0102 PFYKAK PERF CORRRECllONS 05(2.8103 MH'TLP GLVaO BP Exploration (Alaska) STATE OF ALASKA ~ ALASK/ ~L AND GAS CONSERVATION COMI 'SION REPORT OF SUNDRY WELL OPERATIOi,~,.~ 1. Operations performed: [] Operation Shutdown [] Stimulate [] Plugging [] Perforate [] Pull Tubing [] Alter Casing [] Repair Well [] Other 2. Name of Operator 5. Type of well: 6. Datum Elevation (DF or KB) BP Exploration (Alaska) Inc. [] Development KBE = 82' [] Exploratory 7. Unit or Property Name 3. Address [] Stratigraphic Prudhoe Bay Unit P.O. Box 196612, Anchorage, Alaska 99519-6612 [] Service 4. Location of well at surface 8. Well Number ~;.~,:., :;~: ,.-~.~, ~d,~;,~.~ .... . ........ , 731'SNL, 1181'WEL, SEC. 21 T11N, R12E, UM ~i ;~ ,~. -~.~ ...... ~"i. , !~ ~ ~. ~... ~ ~ W-18 At top of productive interval 9. Permit Number / Approval No. 742' SNL, 4888' WEL, SEC. 22, T11N, R12E, UM 188-128 ~,~ F,-~'. ~ ,~., ~. ~ '"'"::~:'~ 10. APl Number At effective depth ~.., ,..., ., ...... ; ~.,~.'.u 50- 029-21880-00 758' SNL, 4814' WEL, SEC. 22, T11 N, R12E, UM :.;~!~;;~!~! ©i; ~¢~. i)~ ~t0~.~i;, ' ......... "~:"'": ~.,,~.~:~:..:u~: 11. Field and Pool At total depth ~ .... ' ............. ~u~:;~,~,~ Prudhoe Bay Field/Prudhoe Bay 768' SNL, 4766' WEL, SEC. 22, T11N, R12E, UM Pool 12. Present well condition summary Total depth: measured 9550 feet Plugs (measured) 7" Baker cement retainer at 9396' true vertical 9206 feet Effective depth: measured 9396 feet Junk (measured) (2) 4" x 2.5" chunks of packer rubber left in hole and IBP true vertical 9060 feet rubber from RWO (07/00) at approx. 9353' Casing Length Size Cemented MD TVD Structural Conductor 80' 20" x 30" 8 cu yds Concrete 110' 110' Surface 2633' 13-3/8" 3830 cuft Permafrost 2663' 2663' Intermediate 8973' 9-5/8" 1772 cuft Class 'G' 9003' 8687' Production Liner 814' 7" 251 cu ft Class 'G' 8736' - 9550' 8435' - 9206' Perforation depth: measured Open: 9225' - 9260', 9268' - 9288', 9292' - 9317', 9320' - 9330', 9339' - 9350', 9374' - 9384' Sqzd: 9359' - 9364', 9405' - 9410' true vertical Open: 8898' - 8931', 8939' - 8958', 8961' - 8985', 8988' - 8997', 9006' - 9016', 9039' - 9049' Sqzd: 9025' - 9030', 9068' - 9073' Tubing (size, grade, and measured depth) 3-1/2", 9.3#, L-80 to 8688'; 3-1/2", 9.2# to 8765'; 3-1/2" tubing from 9353' to 9363' Packers and SSSV (type and measured depth) 9-5/8" Baker packer at 8684'; Baker 'S-3' packer at 8638'; 3-1/2" 'X' nipple at 2134' 13. Stimulation or cement squeeze summary Intervals treated (measured)ORIGINAL Treatment description including volumes used and final pressure 14. Representative Daily Average Production or Iniection Data OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation: Subsequent to operation: 15. Attachments 16. Status of well classifications as: [] Copies of Logs and Surveys run [] Daily Report of Well Operations [] Oil [] Gas [] Suspended Service 17. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed Terrie Hubble~'~ ~ Title Technical Assistent Date Prepared By Name/Number: Terrie Hubble, 564-4628 Form 10-404 Rev. 06/15/88 Submit In Duplicate : 0Perati ns summary Report Page 1 of 3 Legal Well Name: W-18 Common Well Name: W-18 Event Name: WORKOVER Contractor Name: NABORS Rig Name: NABORS 4ES Date .FrOm-.To Hours fActivity Code Phase 7/5/2000 22:00 - 23:59 1.98 MOB DECOMP 7/6/2000 00:00 - 04:00 4.00 MOB DECOMP 04:00 - 08:00 4.00 WHSUR DECOMP 08:00 - 09:30 1.50 WHSUR 09:30- 12:00 2.50 BOPSUR 12:00- 13:30 1.50 BOPSUR 13:30- 15:30 2.00 BOPSUR 15:30- 16:30 1.00 BOPSUR 16:30- 19:30 3.00 WHSUR 19:30 - 23:59 4.48 PULL 00:00 - 07:30 7.50 PULL 11:30-21:30 10.00 CASE 21:30 - 23:59 2.48 CASE 7/7/2000 7/8/2000 00:00 - 07:30 7.50 CASE 12:30 - 22:30 10.00 RUNCOM 22:30 - 23:59 1.48 RUNCOM 7/9/2000 11:00 - 19:00 8.00 PULL 19:00 - 21:00 2.00 FISH 21:00 - 23:59 2.98 FISH 7/10/2000 00:00 - 05:00 5.00 FISH 05:00 - 06:00 1.00 FISH 06:00 - 11:00 5.00 FISH Spud Date: 7/6/2000 End: 7/13/2000 Group: RIG Start: 7/6/2000 Rig Release: 7/13/2000 Rig Number: 4 Description of Operations move rig from w-18 Move in & rig & safe out equipment. Rig Accept @ 0400 hrs. 7~7/2000 rig hard lines to tree & check for psi. on well 150 psi. rig dsm & pull bpv & bleed psi. off well & install twc& test sme to 1000 psi. & rig lines dn from tree. DECOMP Nipple dn tree DECOMP Nipple up bop DECOMP Attempt to test bop & found out that we failed to instil plugs in hanger control line ports. DECOMP Nipple dn bop & install plugs in control line ports & re-install bop's DECOMP body test bop to 250-1ow & 3500 high DECOMP rig up & pull hanger to floor & lay dn same & rig camco equipment to roll up control line. DECOMP pooh laying dn tbg. to sssv & control line & rig dn camco equipment. DECOMP continue to lay dn 3.5" tbg. COMP MU Baker False overshot & HES RTTS & rih on 3.5" drill pipe from shed. COMP Tag cut 3.5" stub @ 8666' (4es KB & Pick up 10' & set RTTS & TEST 9-5/8" csg. to 4000 Psi. for 30-min OK. & circ. dn over cut stub two times. & bottom out & see no psi increase. COMP cont. to pooh laying dn 3.5" dp & RTTS (lost a piece of rubber off of overshot. COMP Rih with completion Baker S-3 Pkr. & Space out. & circ. down over cut jr. space out obershot to 8678' (4es KB) COMP Make up hanger & land same & rilds.& confirm that we can reverse circ. etc. & prepare to run 2.5" gauge on wireline. COMP Pull Completion & stand tbg. in derrick & lay dn Jewelry. COMP MAKE up FTA #1 8-1/8" overshot+6' EXT+3.5" Box Grapple+Bumper sub+Oi Jars+3-6-1/4" DC COMP rih with FTA # 1 picking single dp from shed. DECOMP Rih to top of fish (Tbg. Stud cut jt. @ 8666' DECOMP 'Work overshot over top of fish. (Unable to Identify problem, did not see no indication of fish being latched. DECOMP POOh with BHA #1 & found that we had latched tbg. cut & pipe had parted in pup sub 4' below "sws" nipple it appeared to bo b flattened somewhat although tis could have occured as we were attempteding to latch and could not see no indication that we had fish. very jagged end and flat. 7/11/2000 11:00- 16:30 5.50 FISH OTHR DECOMP 16:30 - 21:00 4.50 FISH DECOMP 21:00 - 22:30 1.50 FISH DECOMP 22:30 - 23:59 1.48 FISH 00:00 - 02:00 2.00 FISH 02:00 - 02:30 0.50 FISH 02:30 - 05:00 2.50 FISH 05:00 - 06:00 1.00' FISH 06:00- 10:00 4.00 FISH DECOMP DECOMP DECOMP DECOMP ~DECOMP DECOMP Tri-State to design a grapple control & guide that would allow us to dress off top of 3.5" flat tbg. & catch 4.5" X 3.5" XO in top of K-Anchor. Make Up BHA # @ 2 Short catch guide w/grapple control cutrig t+4.5' grapple +bs+oj+3-dc& rih with same to top of fish @ 8678' Prep tbg. cut & latch 4.5" x 3.5" xo on top of anchor & go through all exercise to release anchor and had good indication that anchor released. POOH w/fishing tools, no recovery Re-dress fishing tools TIH w/fishing BHA #2 Fish for K Anchor POOH w/fishing BHA. Recovered fish ',i?!::i,~-F :.. Printed: 8/10/2000 11:28:59 AM oPer ti°ns Summary Report Page 2 of 3 Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: Date From - To 7/11/2000 10:00 - 12:00 12:00- 14:00 14:00- 18:00 18:00- 23:30 23:30 - 00:00 7/12/2000 00:00 - 01:00 01:00 - 02:00 02:00 - 07:30 07:30 - 08:30 08:30 - 13:00 13:00- 16:00 7/13/2000 W-18 W-18 WORKOVER Start: 7/6/2000 NABORS Rig Release: 7/13/2000 NABORS 4ES Rig Number: 4 Hours Activity CodeI Phase! 2.00 FISH DECOMP 2.00 CLEAN DECOMP 4.00 CLEAN DECOMP 5.50 CLEAN DECOMP 0.50 CLEAN DECOMP 1.00 CLEAN DECOMP 1.00 CLEAN DECOMP 5.50 RUNCOM COMP 1.00 RUNCOM COMP 4.50 RUNCOM COMP 3.00 RUNCOM COMP 16:00- 20:00 4.00 RUNCOM COMP 20:00- 22:00 2.00 RUNCOM COMP 22:00- 22:30 0.50 BOPSUR COMP 22:30 - 00:00 1.50 WHSUR COMP 00:00 - 01:30 1.50 WHSUR COMP 01:30 - 02:30 1.00 WHSUR COMP 02:30- 06:00 3.50 DHEQP COMP 06:00 - 06:30 0.50 DHEQP COMP 08:00- 14:00 6.00 DHEQP COMP 14:00- 15:30 1.50 DHEQP COMP 17:30 - 19:00 1.50 DHEQP COMP 21:30 - 22:30 1.00 DHEQP COMP 22:30 - 00:00 1.50 DHEQP COMP Spud Date: 7/6/2000 End: 7/13/2000 Group: RIG Description of Operations Break out and LD fish and fishing tools Clear floor. PU scraper/mill assembly for clean-out TIH w/clean-out assembly. Work thru packer to 8774' POOH laying down DP Break down and LD clean-out assembly LD clean-out BHA, pull Wear Bushing Clear floor, LD 3 stands tubing Run 3 1/2" Completion Sting into packer w/slow pump rate to ensure sting-in Pull out of packer and circulate 120 deg SeaWater to elongate tubing Space out wi2 pup jts. PU Tubing Hanger, land hanger to verify space out Reverse in packer fluid (SeaWater w/Corrosion Inhibitor) Check Tubing Hanger seals-OK. Land Tubing Hanger, RI LDS, Set TWC, test to 1000 psi-OK ND BOP NU X-mas tree NU and test X-mas tree RU Lubricator, pull TWC Drop packer setting ball/rod Attempt to set packer. Pressure bleeding off to annulus. Troubleshoot for leak detection Rig Service Leak detection. Pull setting ball/rod w/wireline. Pump and pressure test. Pull RHC sleeve, install positive plug in X nipple Repeat packer setting procedure and pressure test tubing to 3500 psi-lost 60 psi in 30 minutes. Still will not hold pressure from IA side. Pump diesel down IA and U-tube to tubing for freeze protection Pressure tubing to 3500 psi-OK. Pressure test IA to 4000 psi-lost 80 psi in 30 minutes RD wireline and hard lines from X-mas tree. Release rig at 24:00 hours 07-13-2000 Printed: 8/10/2000 11:28:59 AM oPe ati6ns summary Report Page 3 of 3 Legal Well Name: W-18 Common Well Name: W-18 Event Name: WORKOVER Contractor Name: NABORS Rig Name: NABORS 4ES Date From -To HOurs iActivity ~ode Phase 7/7/2000 07:30 - 11:30 4.00 CLEAN COMP 7/8/2000 07:30- 12:30 5.00 CLEAN COMP 7/9/2000 00:00 - 11:00 11.00 RUNCOM COMP 7/13/2000 06:30 - 08:00 1.50 DHEQP COMP 15:30- 17:30 2.00 DHEQP COMP 19:00 - 21:30 2.50 DHEQP COMP Spud Date: 7/6/2000 Start: 7/6/2000 End: 7/13/2000 Rig Release: 7/13/2000 Group: SLIC Rig Number: 4 Description of Operations Run 8.50" gr/jb to 8647' wire line measurement. (rec. nothing. ) Rig HES & rih with 8.5 GR/JB to TBG.Cut @ 8647' Rig Hes & RIH & Pull RHC Plug. @ 8653' & Run #2 2.5" GR/JB.to 8682' No Good Run # 3 2.125" Swedge to 8682' No-Go. No. 4 2.5" Swedge& Knuckle Jr. 8682'-No-Go. #5 2.125" Swedge with Knuckle jr. to 8662' No-Go. RU Wireline Pull RP valve from GLM station #6 Set Dummy GLV in station #6 Printed: 8/10/2000 11:28:59 AM ALASKA OIL & GAS CONSERVATION COMMISSION Attn. LARRY GRANT 3001 PORCUPINE DR. ANCHORAGE AK, 99501. USA Date: 10 August 1994 RE: , Transmittal of Data Sent by: ANCHORAGE EXPRS Dear Sir/Madam, Enclosed, please find the data as described below: WELL .-22 (21-11-13) W-18 (41-21-11-12) D-17 (14-23-11-13). DESCRIPTION 1 PLS STATIC FINAL BL 1 PLS STATIC RF SEPIA 1 PLS STATIC FINAL BL 1 PLS STATIC RF SEPIA 1 COLLAR LOG FINAL BL 1 COLLAR LOG RF SEPIA 1 PFC/PERF FINAL BL 1 PFC/PERF RF SEPIA 1 PFC/PERF FINAL BL 1 PFC/PERF RF SEPIA Run # 1 Run ~ 1 Run # 1 Run # 1 Run # 1 Run # 1 ECC No. 6016.05 4535.01 6036.02 Run ~ 1 5967.01 Run # 1 Run # 1 Run # 1 5761.03 Please sign and return to: Atlas Wireline Services 5600 B Street R Suite 201 Anchorage, AK 99518 AUG y~/ ~t~. Rodney D. Paulson Received b - ~////~/~ Date: Please sign and return to: Petrotechnical Data Center BP Exploration (Alaska) 900 East Benson Boulevard Anchorage, Alaska 9~508 Received by Date ........... STATE OF ALASKA ALA$--".OIL AND GAS CONSERVATION COMMISSIC .... ~ REPORT OF SUNDRY WELL OPE,- ATIONS 1. Operations performed: Operation shutdown Stimulate × Plugging Pull tubing Alter casing Repair well Perforate ..... Other 2. Name of Operator BP Exploration (Alaska) Inc. 3. Address P. 0. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 731' SNL, 1182' WEL, SEC. 21, T11N, R12E At top of productive interval 742' SNL, 4889' WEL, SEC. 22, T11N, R12E At effective depth 757' SNL, 4818' WEL, SEC. 22, T11N, R12E At total depth 768' SNL, 4766' WEL, SEC. 22, T11N, R12E 5. Type of Well: Development X Exploratory Stratigraphic Service 6. Datum elevation (DF or KB) KBE= 82.38' feet 7. Unit or Property name Prudhoe Bay Unit 8. Well number w-18(41-21-11-12) 9. Permit number/approval number 88-128 / 10. APl number 5O- 029-21880 11. Field/Pool Prudhoe Oil Pool 12. Present well condition summary Total depth: measured Effective depth: true vertical measured true vertical Casing Length Structural -- Conductor 80' Surface 2633' Intermediate 8973' Production -- Liner 814 Perforation depth: 9550 feet Plugs (measured) 9206 feet 9383 feet Junk (measured) 9048 feet Size Cemented Measured depth 20x30 8 cu yds 110' 13 3/8 3830 cuft 2663' 9 5/8 1772 cu ft 9003' 7 251 cuft 8736'-9550' measured 9268'-9288', 9292'-9317',9320'-9330',9339'-9350',9374'-9384' Squeezed: 9359'-9364', 9405'-9410' true vertical subsea 8856'-8875',8879'-8903',8906'-8915',8924'-8934',8957'-8966' Squeezed:8942'-894 7', 8986'-8991' Tubing (size, grade, and measured depth) 3 1/2" 9.2# TDS to 8765' True vertical depth BKB 110' 2663' 8687' 8435'-9206' Packers and SSSV (type and measured depth) 9 5/8" Baker Packer@8684', Otis WD Packer@9353',SSSV@2079' 13. Stimulation or cement squeeze summary See Attachment Intervals treated (measured) Treatment description including volumes used and final pressure RECEIVED JU~-~, 2 7 i994 Gas Cons. Commiss 14. Prior to well operation Subsequent to operation Representative Daily Average Production or Injection Data OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure 510 2511 394 1529 540 1874 650 266 Anchorage Tubing Pressure 277 29O 15. Attachments 16. Status of well classification as: Copies of Logs and Surveys run Daily Report of Well Operations Oil X Gas Suspended 17. I hereby ,certify that the foregoing is true and correct to the best of my knowledge. Signed (~, rta,v~(~0~ Q ~,~~ Title SeniorTechnicalAssistantl Form 10-404 Rev 06/15/88 Service Date SUBMIT IN DI~PLI(~ATE 3/27/93 WELL W-18(41-21-11-12) Stimulation Operation A HCL Acid Wash Treatment was performed using the following fluids: SUMMARY 3/26/93 MIRU Nowcam. Pumped 1.250" ball and tested BOPs. LDFN. 3/27/93 RU Nowcam, PT and recovered Meth. Damaged pkr RIH. Ordered out another pkr and RIH. Tied-in and corrected depth to center of pkr. RIH to 9335', set pkr, and opened circulating sub. Pumped two stages of 1500 gals of 15% HCL each followed by SW and the second stage was diverted by 40 quality foam. (Note: Due to pkr pressure limitations and rain N2 pump rate, a 75 quality foam could not be obtained.) Released pkr and POOH. POP well and RDMO Nowcam. Note: Pkr rubbers left in the hole. (Two pieces 8" long and two pieces 4" long.) BBLS. 205 53 72 10 FLUIDS PUMPED DESCRIPTION Sea Water Methanol 15% HCL 40 Quality foam diverter. (Unable to obtain 75 quality foam due to pkr press limitations.) fjh 6/22/94 RECEIVEE; Al~chora BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 DATE: 03-16-93 T# 84385 BP CH LOGS Enclosed is your copy of the materials listed below. If you have any questions, please contact BP Well Records at (907) 564-4004. ~- i 4 _~0' 3.~,~\ CL 03/08/93 #i J-2 LEAK DET 03/08/93 #1 M-20--~'~ PRODUCTION LOG 03/08/93 #1 S-01 ~~ PDK-100 03/07/93 #1 S-34 ~[~PRODUCTION LOG 03/10/93 #1 S-35q~-~q~ PRODUCTION LOG 0.3/11/93 #1 W-18~-~ GR 03/11/93 #1 W2'25~~ GR 03/11/93 '#1 9170.00-10309.00 ATLAS 5 " 5900.00- 9800.00 ATLAS 5 " 9300.00- 9808.00 ATLAS 5 " 9950.00-10620.00 ATLAS 5 " 9700.00-10540.00 ATLAS 5 " 9150.00- 9929.00 ATLAS 5 " 8600.00- 9250.00 ATLAS 5 " 10270.00-10556.00 ATLAS 5 " Information Control Well Records RECEIVED MAR 3 0 199~ Alaska 011 & Gas Cons. Commission Anchorage STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown Stimulate × Plugging__ Pull tubing x Alter casing Repair well Perforate Other x 2. Name of Operator BP Exploration 3. Address P. O. Box 196612, Anchorage, Alaska 99519-6612 5. Type of Well: Development Exploratory Stratigraphic Service 4. Location of well at surface 731'SNL, 1182' WEL, SEC. 21, T11N, R12E At top of productive interval 742' SNL, 4889' WEL, SEC. 22, T11N, R12E At effective depth 757 SNL, 4818 WEL, SEC. 22, T11N, R12E At total depth 768' SNL, 4766' WEL, SEC. 22, T11N, R12E 12. Present well condition summary Total depth: RECEIVED [ IAR 32 1991 Alaska 0il & Gas Cons. Commission Anchorage 6. Datum elevation (DF or KB) KBE -- 82.38' feet 7. Unit or Property name Prudhoe Bay Unit 8. Well number W-18 (41-21-11-12) 9. Permit number/approval number 88-128/90-561 10. APl number 50- 029-21880 11. Field/Pool Prudhoe Bay Field/Oil Pool measured true vertical 9550' feet Plugs (measured) 7" Baker cement retainer @ 9383' ~9206' feet BKB Effective depth: measured true vertical 9383 feet Junk (measured) 9048 feet BKB Casing Structural Conductor Surface Intermediate Production Liner Perforation depth: Length 80' 2633' 8973' 814 measured true vertical Size Cemented Measured depth True vertical depth BKB 20x30 8 cu yds 110' 11 O' 13-3/8 3830 cu ft 2663' 2663' 9-5/8 1772 cu ft 9003' 8687' 7 251 cu ft 8736'-9550' 8435'-9206' 9268~9288~ 9292~9317~ 932059330~ 9339~9350~ 9374'-9384' Squeezed: 9359~9364~ 94055 9410' subsea 8856'- 8875', 8879'- 8903', 8906'- 8915', 8924'- 8934', 8957'- 8966' Squeezed: 8942'- 8947', 8986'- 8991' TUbing (size, grade, and measured depth) 3-1/2" 9.2# TDS to 8765' Packers and SSSV (type and measured depth) 9-5/8" Baker Packer @ 8684', Otis WD Packer @ 9353', SSSV @ 2079' 13. Stimulation or cement squeeze summary Cement squeezed thru retainer @ 9380' with 129 cu ft Class G, final squeeze pressure 2350 psi. Intervals treated (measured) 9268'- 9410' cement squeezed 9268'- 9384' HCL stimulation Treatment description including volumes used and final pressure Reperforated and performed stimulation with 42 bbls 15 % HCL, final treating pressure 2000 psi. 14. Reoresentative Daily Average Production or Injection Data OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure Prior to well operation 4 hours 860 1254 1962 Subsequent to operation 12 hours 1150 2293 942 1626 Tubing Pressure 253 312 15. Attachments Copies of Logs and Surveys run Daily Report of Well Operations 16. Status of well classification as: Oil x Gas Suspended Service 17. I hereby certify that the foregoing Form 10-404 Rev 06/15/~'8 is true and correct to the best of my knowledge. Title Completion Engineering Supervisor Date S/-~/~ ! SUBMIT IN DUPLICATE BP EXPLORATION DAILY WORKOVER REPORT: As of 0600 Hrs. Tuesday, July 24, 1990 WELL: W-18 (41-21-11-12) PRUDHOE BAY UNIT RIG: DOYON #16 Day: -5 Expense AFE Number: Expense AFE Amount = 145017 Current Field Cost = Estimated Final Cost = Current Operation: Moving dg to Well W-18. Summary of Last 24 Hours: Moving dg to Well W-18. Reviewed By: BP EXPLORATION DAILY WORKOVER REPORT: PRUDHOE BAY UNIT As of 0600 Hrs. Wednesday, July 25, 1990 WELL: W-18 (41-21-11-12) RIG: DOYON #16 Day: -6 Expense AFE Number: Expense AFE Amount = 145017 Current Field Cost = Estimated Final Cost = Current Operation: Moving rig. Summary of Last 24 Hours: Moving rig. Reviewed By: BP EXPLORATION DAILY WORKOVER REPORT: As of 0600 Hrs. Thursday, July 26, 1990 WELL: W-18 (41-21-11-12) PRUDHOE BAY UNIT RIG: DOYON #16 Day: -7 Expense AFE Number: Expense AFE Amount = 145017 Current Field Cost = Estimated Final Cost = Current Operation' Moving rig to W-18. Summary of Last 24 Hours: Moving rig to W-18. Reviewed By' ~",~. BP EXPLORATION DAILY WORKOVER REPORT: As of 0600 Hrs. Friday, July 27, 1990 WELL: W-18 (41-21-11-12) PRUDHOE BAY UNIT RIG: DOYON #16 Day: 1 Expense AFE Number: Expense AFE Amount = 145017 Current Field Cost = Estimated Final Cost = Current Operation: RIH with new wireline plug. Summary of Last 24 Hours: Accepted rig at 1200 hours on 7/26/90. MIRU. Pull BPV. Pumped seawater down tubing. RIH with X-plug and set in tailpipe. Plug leaked. RIH and pulled X-plug. Reviewed By: [:::::. ~. BP EXPLORATION DALLY WORKOVER REPORT: As of 0600 Hrs Monday, July 30, 1990 WELL: W-18 (41-21-11-12) PRUDHOE BAY UNIT RIG: DOYON #16 Day- 4 Expense AFE Number: Expense AFE Amount = 145017 Current Field Cost = Estimated Final Cost = Current Operation: RIH with 6" bit and 7" scraper. Summary of Last 72 Hours' Set plug in tailpipe. Opened sliding sleeve and circulated well to seawater. ND tree and NU BOP's. Pulled 3-1/2" tubing. Recovered slick stick. Milled and recovered packer. Reviewed By: ~.~N,. BP EXPLORATION DAILY 'WORKOVER REPORT: As of 0600 Hrs. Tuesday, July 31, 1990 WELL: W-18 (41-21-11-12) PRUDHOE BAY UNIT RIG: DOYON #16 Day: 5 Expense AFE Number: Expense AFE Amount = 145017 Current Field Cost = Estimated Final Cost = Current Operation: RIH with cement retainer. Summary of Last 24 Hours: RIH with 7" scraper to PBTD. RIH with 7" RTTS and set at 8799'. Tested 9-5/8" x 7" to 3000 psi, ok. RIH with wireline perforating guns and perforated interval 9405' to 9410'. Reviewed By: BP EXPLORATION DAILY WORKOVER REPORT: PRUDHOE As of 0600 Hrs. Wednesday, August 1, 1990 WELL: W-18 (41-21-11-12) BAY UNIT RIG: DOYON #16 Day: 6 Expense AFE Number: Expense AFE Amount = 145017 Current Field Cost = Estimated Final Cost = Current Operation: RIH with 9-5/8" scraper. Summary of Last 24 Hours: Logged cement retainer into place. Established injection rate below cement retainer. Mixed and pumped 23 bbls of cement. Hesitate squeeze from 350 psi to 2350 psi. RIH with 6" bit and cleaned out to top of retainer. Tested squeeze to 1000 psi, ok. Reviewed By: BP EXPLORATION DAILY WORKOVER REPORT: As of 0600 Hrs. Thursday, August 2, 1990 WELL: W-18 (41-21-11-12) Day: 7 Expense AFE Number: Expense AFE Amount = 145017 Current Field Cost = Estimated Final Cost = PRUDHOE BAY UNIT RIG: DOYON #16 Current Operation- RIH with 5" ddil pipe conveyed perforating guns. Summary of Last 24 Hours- Tested squeeze perforations, 9-5/8" casing, and liner lap to 1000 psi, ok. RIH with 8-1/2" bit and 9-5/8" scraper to 8736'. RIH with 6" bit and 7" scraper to 9380'. Reviewed By: BP EXPLORATION DAILY WORKOVER REPORT: As of 0600 Hrs. Friday, August 3, 1990 WELL: W-18 (41-21-1 1-12) PRUDHOE BAY UNIT RIG: DOYON #16 Day: 8 Expense AFE Number: Expense AFE Amount = 145017 Current Field Cost = Estimated Final Cost = Current Operation: Attempt to flow well. Summary of Last 24 Hours: RIH wi 5" ddll pipe. Tie-in w/GPJCCL, cement retainer 3' too high. POH, RIH w/8' less on perf guns. Tie-in and shoot 1000 psi underbal. DP pressure incr 330 psi/15 min. Bleed down DP pressure. Reviewed By: ~-~-~--, BP EXPLORATION DAILY WORKOVER REPORT: As of 0600 Hrs. Monday, August 6, 1990 WELL: W-18 (41-21-11-12) PRUDHOE BAY UNIT RIG: DOYON #16 Day: 1 1 Expense AFE Number: Expense AFE Amount = 145017 Current Field Cost = Estimated Final Cost = Current Operation: Set W/L plug in lower SWS nipple to set packer. Summary of Last 72 Hours: Well did not flow to surface after perforating. Reverse circulate, recovered some gas and crude. POH with perf guns. RIH to 9393' w/ 6" bit and 7" scraper. Reverse circulate hole clean. Pump 12 bbls HCL to pickle ddll pipe, reverse. Wireline perf 9378' - 9386'. Acidize perfs in 2' intervals w/Baker "SAP" packer 40 bbls HCL. Displace NH4CL into formation. Set Otis "WD" packer assy on wireline. Top of packer at 9353'. Run 3-1/2" completion. ND BOPE. NU and test Adapter Flange/Control Lines/l'me. Reviewed By' ,~"~ BP EXPLORATION DALLY WORKOVER REPORT: As of 0600 Hrs. Tuesday, August 7, 1990 WELL: W-18 (41-21-11-12) PRUDHOE BAY UNIT RIG: DOYON #16 Day: 1 2 Expense AFE Number: Expense AFE Amount = 145017 Current Field Cost = Estimated Final Cost = Current Operation: Released rig. Summary of Last 24 Hours: Set plug in lower SWS nipple. Set packer at 8684' at 3000 psi. Hold pressure 15 minutes. Test annulus to 2500 psi for 30 minutes. Shear RP valve in top station at 2900 psi. Freeze protect well w/146 bbls diesel. Install BPV. Release dg at 1200 hrs on 8/6/90. Reviewed By: Attachment I Accepted rig at 1200 hours on 7/26/90. Pulled 3-1/2" tubing. Milled and recovered packer. Tested 9-5/8" x 7" to 3000 psi, ok. RIH with wireline perforating guns and perforated interval 9405' to 9410'. Pumped 23 bbls of cement through retainer. Cleaned out to top of retainer. Tested squeeze perforations, 9-5/8" casing, and liner lap to 1000 psi, ok. Tied-in and shot 1000 psi underbalance. Pumped 12 bbls HCL to pickle drill pipe, reversed. Wirelined perf 9378'- 9386'. Acidized perfs in 2' intervals with Baker "SAP" packer 40 bbls HCL. Set Otis "WD" packer assy at 9357'. Ran 3-1/2" completion. Set packer at 8684' at 3000 psi. Tested annulus to 2500 psi for 30 minutes. Released rig at 1200 hours on 8/6/90. 11.0 Days BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 TO: DISTRIBUTION Date :10/24/90 T#:81764 FROM: SUBJECT: Information Control Well Records LR2-1 BP CASED HOLE FINALS Enclosed is your copy of the matedal listed below, if you have any questions, please contact BP Well Records at (907) 564-4445. ~W-18 Prod-F 10/19/90 #1 9150-9383 Sch 5" Distribution: ARCO CHEVRON EXXON GEOSCIENCES MOBIL PHILLIPS RESERVOIR STATE OF ALASKA ARCHIVES BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard PO. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 TO: DISTRIBUTION Date :08/13/90 T#:81489 FROM: SUBJECT: Information Control Well Records LR2-1 BP CASED HOLE FINALS Enclosed is your copy of the material listed below. If you have any questions, please contact BP Well Records at (907) 564-4445. W-18 PFC 08/05/90 #1 9234-9368 Atals 5" Distribution: ARCO CHEVRON EXXON GEOSCIENCES MOBIL PHILLIPS ARCHIVES BP EXPLORATION BP Exl31oration (Alaska)Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage. Alaska 99519-6612 (907) 561-5111 TO: DISTRIBUTION Date: 08~07~90 T#:81377 FROM: SUBJECT: Information Control Well Records LR2-1 BP CASED..HOLE FINALS Enclosed is your copy of the matedal listed below. If you have any questions, please contact BP Well Records at (907) 564-4445. .~-R- 12 COLLAR 07/30/90 #1 10672-10898 ATLAS --R-13 CCL 07/30/90 # 1 9520-9990 ATLAS -'R-19 PFC 07/31/90 #1 9500-10020 ATLAS -"W- 18 PFC 08/03/90 #1 8949-9169 ATLAS ~W-18 PFC 08/04/90 #1 9228-9373 ATLAS ~,.:W- 18 ~ 07/31/90 #1 8327-9439 ATLAS 5~ 5" 5" 5" Distribution: ARCO CHEVRON EXXON GEOSCIENCES MOBIL PHILLIPS RESERVOIR STATE OF ALASKA ARCHIVES Alaska Oit & Gt~s Cons. STATE OF ALASKA ~':' A,_. ,,SKA OIL AND GAS CONSERVATION COMMI;:>oION APPLICATION FOR SUNDRY APPROVALS 1. Type of Request: Abandon ~ Suspend ~ Operation Shutdown Re-enter suspended well__ Alter casing ~ Repair well __ Plugging __ Time extension __ Stimulate X Change approved program __ Pull tubing x Variance~ Perforate ~ Other x 2. Name of Operator BP Exploration 3. Address P. O. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 731'SNL, 1182' WEL, SEC. 21, T11N, R12E At top of productive interval 742' SNL, 4889' WEL, SEC. 22, T11N, R12E At effective depth 760'SNL, 4803'WEL, SEC. 22, T11N, R12E At total depth 768' SNL, 4766'WEL, SEC. 22, T11N, R12E 12. Present well condition summary Total depth: measured true vertical Cement Squeeze 5. Type of Well: Development x Exploratory Stratigraphic Service 6. Datum elevation (DF or KB) KBE = 82.38' feet 7. Unit or Property name Prudhoe Bay Unit 8. Well number W-18 (41-21-11-12) 9. Permitnumber 88-128 10. APInumber 50- 029-21880 11. Field/Pool Prudhoe Bay Field/Oil Pool 9550' feet Plugs (measured) 9206' feet BKB Effective depth: measured true vertical 9432' feet Junk (measured) 9094' feet BKB Casing Structural Conductor Surface Intermediate Production Liner Perforation depth: Length Size Cemented Measured depth 110' 2663' 9003' 80' 20x30 8 cu yds 2633' 13-3/8 3830 cu ft 8973' 9-5/8 1772 cu ft 814 7 251 cu ft 8736'-9550' measured 9268'-9288', 9292'-9317', 9320'-9330', 9339'-9344', 9359'-9364' true vertical subsea 8856'-8947 (five intervals) Tubing (size, grade, and measured depth) 3-1/2" 9.2# TDS to 8777' Packers and SSSV (type and measured depth) 9-5/8" Packer @ 8668', SSSV @ 2101' True vertical depth BKB 110' 2663' 8687' 8435'-9206' RE(: JVED 13. AEachments Description summary of proposal x Detailed operations program BOP sketch x 14. Estimated date for commencing operation Ju/y 24, 1990 16. If proposal was verbally approved Name of approver Date approved 15. Status of well classification as: Oil x Gas Suspended __ Service I17. I hereby certify that the foregoing is tr)~ an~;;Lqorrect to the best of my knowledge. Signed ~~ Title Completion Engineering Supervisor ~ FOR COMMISSION USE ONLY Conditions of approv'~l: Notify Commission so representative may witness Plug integrity ~ BOP Test~ Location clearance ~ Mechanical Integrity Test__ Subsequent form required 10- z-7/,~ ~ Orl01nal Approved by order of the Commission David W, Commissioner SUBMIT INTRIPLICATE Form 10-403 Rev 06/15/88 Approved Copy Returned o 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. 17. 18. 19. 20. 21. 22. 23. 24. 25. 26. 27. 28. 29. Attachment I Well W-18 Workover Procedure Outline Procedure: MIRU workover rig. Pull BPV. Circulate well to seawater. Install two-way check valve. ND tree. NU and test BOP's to 5000 psi. Pull 3-1/2" tubing string. Test the 9-5/8" packoff and replace if necessary. Recover slick stick. RIH with mill and PRT and recover the 9-5/8" Packer and tailpipe assembly. RIH with 7" Test Packer and test 9~5/8" casing and 7" liner lap. RIH with 6" bit and 7" casing scraper to PBTD. Reverse circulate hole clean. Shoot squeeze pedorations in channel. Set cement retainer on drill pipe immediately above squeeze perforations. Cement squeeze with Acid Resistant cement. Drill out cement to top of retainer and test. Re-squeeze if necessary. RIH with 9-5/8" casing scraper to 7" liner top. Reverse circulate hole clean. RIH with 7" casing scraper to PBTD. Reverse circulate hole clean and change over to filtered inhibited brine. RIH with drill pipe-conveyed perforating assembly, log into position with GR/CCL. Perforate and flow well to sudace. RIH with PIP and acid stimulate all pedorations. Underbalance with nitrogen and flow back well. Run 8.5" gauge ring/junk basket to 7" liner top. Run 6.0" gauge ring/junk basket to PBTD. RU E-line, set 7" isolation packer with 3-1/2" tailpipe assembly. Run existing 3-1/2" tubing and wellhead equipment. Set and test the 9-5/8" packer. Set two-way check valve. ND BOP's. NU and test tree to 5000 psi. Pull two-way check valve. Shear valve in the GLM and displace annulus to 140 bbls diesel. U-tube diesel to the tubing. Set BPV. Release rig. BOP STACK CONFIGURATION ATTACHMENT II 13 5/8", 5000 PSI WP TRIPLE RAM ST ACK WORKO VER RISER ANNULAR PREVENTER 2" KILL LINE PI PE RAMS PI PE RAMS i MANUAL GATE HYDRAULIC GATE DRILLING SPOOL i I BLIND RAMS I 4" CHOKE LINE HYDRAULIC MANUAL GATE GATE BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 To HOUSTON ARCO CHEVRON EXXON MOBIL PHILLI PS STATE OF GEOSCIENCES RESERVOIR ARCHIVES ALASKA BP CASED HOLE FINAL LOGS Date: 05/15/89 T%: 80063 The following material is being submitted herewith. Please acknowledge receipt by signing a copy of this letter and returning it to this office: A-II Inj-F 05/03/89 81 9800-10053 Camco 5" C-21 Prod-F 05/05//89 91 8900-9214 Camco 5" D-18 Temp 05/04/89 91 2900-11200 Camco H-12 GR 04/27/89 ~1 9100-11310 Camco J-23 Completion 05/08/89 ~1 10396-11607 Sch Q-04 Tubing Record 05/05/89 ~1 8882-9524 Sch R-19 Prod-F 05/02/89 %1 9500-9950 Camco W-17 completion 05/07/89 81 11370-11850 Sch W-18 PITS 05/05/89 ~1 9050-9507 Camco 5" W-22 PITS 05/04/89 ~1 9300-9650 Sch 5" W-22 Prod-F 05/04/89 ~1 9300-9674 Sch 5" X-24 Inj-F 05/03/89 91 9100-9345 Camco 5" Y-18 Inj-F 05/02/89 ~1 10850-11115 Camco Received: Date: AisSka. Oil & Gas Oon~. Commission Anchorage Information Control Well Records LR2-1 J. Dietz/S. McCurry BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 To ARCO EXXON PHILLIPS STATE OF ALASKA Date:03/29/89 Tf:79908 SYSTEM Tape & Transmittal Only ARCHIVES BP MAGNETIC LIS TAPE & LISTING The following material is being submitted herewith. Please acknowledge receipt by signing a copy of this letter and returning it to this office: Z-24 OH/DIFL/BHC-CN Poro 03/19/89 ~- 7319-10796 TPf 06378 Atlas93752 1600bpi API~50-029-21917 CH/CNL-D 4Pass 2.5 Tool 03/19/89 ~1 Schf73224 1600bpi API950-029-21652 CH/CNL-D 4 Pass 2.5 Tool 03/19/89 #1 Sch~73208 1600bpi API~50-029-21616 CH/CNL-D Main Pass 2,5 Tool 03/19/89 TP~ 06381 Schf73207 CH/CNL-D 4 Pass 2.5" Schf73200 1600bpi · G-25 ~ G-31 eW-07 W-18 9694-10521 TP# 06379 8391-9131 TP~ 06380 13693-14720 1600bpi APIf50-029-21918 03/15/89 fl 8964-9532 TPf 06382 API950-029-21880 ACHIVES ONLY: G-25 G-31 CH/field tape API#50-029-21652 CH/field tpae API%50-029-21616 W-07 CH/field tape 03/19/89 fl TPf 06385 API~50-029-21918 CH/field tape API%5 .21880 03/19/89 fl TP% 06383 03/19/89 fl TPf 06384 W-18 03/16/89 %1 TPf 06386 Sch#73224 800bpi Schf73208 800bpi Schf73207 800bpi Sch#73200 800bpi Received: Date: Information Control Well Records LR2-1 J. Dietz/S. McCurry BP EXPLORATION HOUSTON ARCO ~ON BP Ext3ioration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage. A'lasi<a 99519-6612 (907) 561-5111 EXXON TEXA~,O Date: 03 - 22 - 89 TO: MOBIL T~: 79903 P]~[ILL II~ S STATE OF ALASKA GEOSCIENCES RESERVOIR REFERENCE: ARC~'~'~S : · ]~p'CASED BOLE ~']:NAT. ~OGS The roi lowing material is being submi'l-l'ed herewith. Please acknowledge receipt by signing a copy of this letter' and returning It to this office: G-16 TDT-P" 03-!6-89 #1 9296-10076 Sch 5" N-21 PER,F 03-14-89 #1 9950-11279 Sch 5" S-01 PERF 03-15-89 #1 9450-1 0640 Sch 5" W-18 CNL/GR 03-15-89 #1 8990-9498 Sch 5" Rece i ved - I NFORHAT I ON CONTROL Date " Wei I Records LR2-1 Slandard Alaska Producllon Company 900 Eos~ Benson Boulevard P.O Bo~ 196612 Anchorage. Alaska 99519-6612 (907) 564-5111 INDEXED TO: HOUSTON ARCO CHEVRON EXXON TEXACO MARATHON MOBIL STANDARD ALASKA PRODUCI"ION 11-30-88 Date: 79597 PHILL'IPS STATE OF ALASKA GEOSCIENCES REFERENCE: ARCHIVES SAPC OPEN HOLE FINAL LOGS The following material Is being submitted herewith. Please acknowledge receipt by signing a copy of this letter and returning It to thls office: HOU/UNIT/STATE: W-18 11-25-88 CN/Gr Raw-Poro #1 6690-9500 Atlas 5" W-18 11-25-88 DIFL #1 9004-9554 Atlas 2"/5" W-18 11-25-88 BHC/AL-GR #1 9004-9524 Atlas 2"/5" Alaska Oil & Gas Cons. Commission Anchorage STATE ONLY: DIRECTIONAL SURVEYS Magnetic Single Shot Directional Survey Date: 11=.23~.88 Jobf/: A-~llll-0~I GyrO'scopic Directional .Survey Date: 11-2~88 Jobf!: 73047 ~~[Wl)ce i ved Date: .11~28~88 Job~ 667 Shirley R. McCurry I NFORMAT I ON CONTROL Date Wel I Records LR2-1 A uni! of ~he o~'ig;nol S'ondard Oil Componl, Founded ;n Cle-elond, Ol~io, in 1870 STATE OF ALASKA ~ ALASKA OIL AND GAS CONSERVATION COMMISSION ~ WELL COMPLETION OR RI=COMPLETION REPORT AND LOG 1. Status of Well Classification of Service Well OIL [] GAS [] SUSPE~ [] ABANDONED [] SERVICE [] 2. Name of Operator 7. Permit Number Standard Alaska Production Company 88-128 3. Address 8. APl Number P. O. Box 196612, Anchorage, Alaska 99519-6612 50- 029-21880 4. Location of well at surface ,:----.......,,[131~--ATIt"~:- 9. Unit or Lease Name 731' SNL, 1182' WEL, SEC. 21, T11N, R12Et VERIFtED Prudhoe Bay Unit At Top Producing Interval ~_~ 10. Well Number · W-18(41-21-11-12) 742' SNL, 4889' WEL, SEC. 22, T11N, R12E ...... 11. Field and Pool At T°tal Depth Prudhoe Bay Field/Prudhoe Bay Pool 768' SNL, 4766' WEL, SEC. 22, T11N, R12E 5. Elevation in feet (indicate KB, DF, etc.) ]6. Lease Designation and Serial No. KBE = 82.38' I ADL 28263 12. Date Spudded 13. Date T.D. Reached 14. Date Comp., Susp. or Aband. 115. Water Depth, if offsho re 116. No. of Completions 11/12/88 11/26/88 11/30/88I N/A feet MSL I One 17. Total Depth (MD+TVD) 18. Plug Back Depth (MD+'rVD) 19. Directional Survey ]20. Depth where SSSV set ]21. Thickness of Permafrost 9550'MD 9206'TVD 9432'MD 9094'TVD YES [] NO []I 2101 feet MD ] 1862' 22. Type Electric or Other Logs Run GR/DIL/BHC/CNL 23. CASING, LINER AND CEMENTING RECORD SETTING DEPTH MD CASING SIZE WT. PER FT. ~DE TOP Be'FI'OM HOLE SIZE CEMENTING RECORD AMOUNT PULLED 20" Conductor Surface 110' 13-3/8" 68tt L-80 Surface 2663' ' 17-1/2" 3830 cu. ft. Permafrost 9-5/8' 4711 NSCC Surface 8846' 12-1/4" 9-5/8" 47tt Butt 8846' 9003' 12-1/4" 1772 cu. ft. Class G 7" 2611 IJ4S 8736' 9550' 8-1/2" 251 cu. ft. Class G 24. Perforations open to Production (MD+TVD of Top and Bottom and 25. TUBING RECORD interval, size and number) SIZE DEPTH SET (MD) PACKER SET IMD) Schlumberger5"@ 4 spf. 3-1/2" TDS 8777' 8668' MD TVDss 9268'-9288' 8856'-8875' 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. 9292'-9317' 8879'-8903' DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED 9320'-9330' 8906'-8915' 13-3/8"X 9-5/8" Freeze Protect 13-3/8"x 9-5/8" 9339'-9344' 8924'-8928' Annulus with 150 BBLS Dry Crude. 9359'-9364' 8942'-8947' 27. PRODUCTION TEST Date First Production IMethod of Operation (Flowing, gas lift, etc.) 11/29/88 I Flowing Date of Test Hours Tested PRODUCTION FOR OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE [GAS-OIL RATIO TEST PERIOD II~ Flow Tubing Casing Pressure CALCULATED=~. OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-APl (corr) Press. 24-HOUR RATE 28. CORE DATA Brief description of lithology, porosity, fractures, apparent dips, and presence of oil, gas or water. Submit core chips. .'.:,.,'aska 0il & Gas Cons. "~chorage Form 10-407 Rev. 7-1-80 CONTINUED ON REVERSE SIDE Submit in duplicate 29. ~. 30. ~ , GEOLOGIC MARKE~ FORMATION TESTS NAME Include interval tested, pressure data, all fluids recovered and gravity, MEAS. DEPTH TRUE VERT. DEPTH GOR, and time of each phase. SAG 9011' 8612' SHUBLIK A 9039' 8638' ZONE 4 9158' 8752' ' 31. LIST OF ATTACHMENTS 32. I hereby certify that the foregoing is true and correct to the best of my knowledge Signe(~-~_,~~,~/..~y Title PBtJ Drilling Engineering SL/oervi~or Date//~'~/~ INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Item 1' Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and 24 · If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). Item 23: Attached supplemental records for this well should show the details of any multiple stage cement- ing and the location of the cementing tool. Item 27: Method of Operation' Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In- jection, Gas Injection, Shut-in, Other-explain. Item 28: If no cores taken, indicate "none". Form 10-407 STANDAF~D ALASKA PRODUCTION Daily Drilling Report -- Prudhoe Bay Unit November 14, 1988 at 0600 hfs Rig: 22E Well: W-18(41-21-11-12) AFE # 120771 APl: 50-029-21880 AFE Amount: Current Amount: 0600 Depth: 2,600 Day' 2 72- Hour Ftg: 2,770 Current Operation: CBU to run 13-3/8" casing _ Accepted rig 1430 hours 11-11-88. Spud 0230, 11-12-88. Drilled and surveyed 17-1/2" hole ,to 2,690'. Mud Type: Ligno SURVEY MD WT: 9.9 VIS'58 PV: 15 YP: 15 FL: 15.0 Solids: 12 Temp: ANGLE DIRECTION TVD SECTION COORDINATES 56 qF D[,S STANDARD ALASKA PRODUCTION Daily Drilling Report -- Prudhoe Bay Unit November 15, 1988 at 0600 hfs Rig' Nabors 22E Well: W-18(41-21-11-12) AFE # 120771 APl- 50-029-21880 AFE Amount: Current Amount: 0600 Depth: 2,690 Day: 3 24- Hour Ftg: Current Operation: Nippling up well head and BOP's. Circulate and condition hole for 13-3/8" casing. Run and cement 13-3/8",casing. Mud Type: Light .Disp. SURVEY M,D WT: 9.7 VIS: 50 PV: 14 YP: 7 FL: 18 Solids: 9 Te.mp: ANGLE DIRECTION TVD SECTION COORDINATES. DLS STANDARD ALASKA PRODUCTION Daily Drilling Report -- Prudhoe Bay Unit November 16, 1988 at 0600 hfs Rig: Nabors 22E Well: W-18 (41-21-11-12) AFE # 120771 API: 50-029-21880 AFE Amount: Current Amount: 0600 Depth: 2,690 Day: ~4 24 - Hour Ftg: Current Operation: Testing BOP's NU wellhead. NU and tested BOP's. Repair leaks. Mud Type: Light Disp. SURly MD WT: 9.7 VIS: 37 PV: 9 ANGLE DIRECTION TVD YP: 2 FL: 13.2 SECTION Solids: 9 Temp: °F COORDINATES DLS STANDARD ALASKA PRODUCTION Daily Drilling Report -- Prudhoe Bay Unit November 17, 1988 at 0600 hfs · Rig: Nabors 22E Well: W-18 (41-21-I1-12) AFE # 120771 API: 50-029-21880 AFE Amount: Current Amount' 0600 Depth: 3,860 Day: 5 24- Hour Ftg: 1,170 Current Operation: Drilling 12-I/4" hole Repaired leaks. Tested BOP's. Cleaned out and tested 13-3/8" casing. Drilled out and performed FIT. Drilled 12-1/4" hole with surveys to 4,513'. Mud Type: SURVEY o WT: 9.5 VIS: 38 PV: 5 YP: 5 FL: 13.2 Solids: 7 Temp: ANGLE DIRECTION TVD SECTION COORDINATES 65o1:: DLS [' 'STANDARD ALASKA PRODUCTION Daily Drilling Report -- Prudhoe Bay Unit November 18, 1988 at 0600 hfs Rig' Nabors 22E Well: W-18 (41-21-11-12) AFE# 120771 APl: 50-029-21880 AFE Amount: Current Amount: 0600 Depth: 4,989 Day: 6 24- Hour Ftg: 1,129 Current Operation: Drilling 12-1/4" hole with motor Drilled 12-1/4" hole with surveys to 4,325'. Made short trip. Drilled 12-I/4" hole with surveys to 4,937'. PU Dynadrill to KO. Drilled 12-1/4" hole with motor to 4,989'. Mud Type: Ligno ~URVEY MD_ WT:9.8 VIS:39 PV:6 ANGLE DIRECTION TVI) YP: 5 FL: 7.2 SECTION Solids: 10.5 Temp: COORDINATES 68°F STANDARD ALASKA PRODUCTION l)aily l)rilling Reporl -- l'r~dl,~m )x:~vct~l)cr 21, t',~,~,'~ ;il {1~,(1(I 1--12) AI-"I~ t/ 12()771 Al'l: 0600 Depth: 7,258' Day: 9 72-IlourFtg: 2,269' Current Operation: Drilling 12-1/4" hole. Dyna drilled 12-I/4" hole to 5319'. PU BHA- Drilled I2-1/4" hole w/surveys to 6,962'. Changed BHA. Drilled 12-1/4" hole w/surveys to 7,258'. Mud Type: Ligno SURVEY MD WT: 10.1+ VIS: 42 PV: 13 YP: 11 FL:4.6 ANGLE DIRECTION TVD SECI'ION Solids:13.5 Tcmp: COORDINATES 73~5 DLS STANDARD ALASKA PRODUCTION l)ailv l)rilling Rel)or! -- l'rudhoe Ii:iv tJ~il ~"~(~vclz:l)c:' 22, 1()~ al ()()l)() tirs At:I' tt 12()771 Al'I- 5()-()29-,, ~ 1 /', t:1'; A (..' ti I ICIll Current Operation: ()(iX) Depth: 8,220' Day: 10 24-1IourFtg' 962' \.Vashing lo bottom. Drilled 12-I/4" hole w/surveys to 8,220'. Trip for BItA. Mud Type: Ligno SURVEY MD WT: 10.2 VIS-42 ANGLE DIREC-'TION PV: 14 YP: 9 FL: 4.2 TVD SECTION Solids: 14.5 Ternp: COORDINATES ,DL~ STANDARD ALASKA PRODUCTION Daily Drilling Report-- Prudhoe Bay Unit N~vcml~er 23, 19S~ at 06()()hrs I<i,,' Nabor.~ 22t:~ \\'c-ll' %N."--1S (dl-21-11-12) AFE# 12()771 APl' 5()-029-21880 CIlI'I'cII[ /'k lll()l.l Il t' Current Operation' 0600 Depth: 9020 Day: I 1 24- Hour Ftg: 800 POH to run 9-5/8" casing. Drilled 12-1/4" hole form 8220'-9020' with surveys. Mud Type: Ligno S.._URVEY MD WT: 10.4 VIS:39 PV:8 ANGLE DIRECTION TVD YP: 5 FL: 4.4 SECTION Solids: 15 Temp: 96°F COORDINATES DL~, STANDARD ALASKA PRODUCTION l)ailv l)rillirlg Rep~)r! -- I~rutll:(~c l{ay [Jni( N~)vcflll)cr 2,5, 198,5 al ()(:()() Ill's Al:t'lf I2¢)77 At'I' 5()-029-21 Currc~t ,,X~c)u Current Opcration: 06(X) I)¢pth: PBTD 9,432' Day: 16 120- Ilour Ftg: 539' Rigging up shooting flange. Ran and cemented 9-5/8" casing. Drilled 8-I/2" hole to 9,290'. Logged. Ran and cemented 7" liner. Dressed off TeL. Cleaned out and tested liner. Displaced to 9.2 ppg brine. Tested casing. Mud Type: Brine ~URVEY MD WT: 9.2+ VIS- PV: YP: FL: Solids: Temp: °F ANGLE DIRECTION TVD ~ECTION COORDINATES ,DL$ STANDARD ALASKA PRODUCTION I)aily l)riiling Report -- l~rudhoe Bay [Jnil INoven~l)ev 29, 19~ :il ()6()()hfs Rig: Nabors 22F. x, Vcll: W-18(41-21-11-12) AI:t~# 120771 At>I: 50-()29-21880 Al:t{ Currc~lt Current Operation: 0600 Dcpth: 9,432' Day: 17 24- Hour Ftg: Running 3-1/2" tubing. Ran cased hole logs. Perforated as follows: 9,320' - 9,330' (10') 9,354' - 9,364' (10') 9,268 - 9,288' (20') 9,339 - 9,344'(5') 9,292 - 9,317' (25') Rigged up to run tubing. Mud Type: Brine SURVEY MD WT: 9.2+ VIS: PV: YP: .ANGLE DIRECTION .TVD SECTION Solids: Temp: °F COORDINATES DL~ STANDARD ALASKA PRODUCTION l)aily Drilling Report -- Prudhoc liar N()vc~z~l)cr 3(), 198N al ()6()() hr.,; U n i I Rig: N;:bor.~ 22l: \Vcll' W-IS (.I!-2i-I1-13) A }-.'t-~ # 120771 At'l: 504)29-21880 Current Operation: 0600 Depth' 9,432' Day: 18 24 - ttour Ftg: Testing Packer. Ran 3-I/2" tubing. ND BOP's. NU and test tree. Set packer. Mud Type: Brine .SURVEY MD WT: 9.2+ VIS: PV: YP: FL: ANGLE DIRECTION TVD SECTION Solids: Temp: °F COORDINATES DLS STANDARD ALASKA PRODUCTION Daily Drilling RCporl -- I'r~dh~e Bay Uni! l)eccml~er l, 19gg at ()6()() l~r's Well' W'-ig(41-21-t /\FF.# 12()771 APl: 50-029-21880 Cul'rC~t An~ount: 0600 Depth' 9,432' Day: 19 24- Hour Ftg: Current Operation: Released Rig 1800 hrs, 11/30/88. Displaced annulus to 9.6 brine and tubing to diesel. Set BPV. Released Rig. Mud Type: SURVEY WT: VIS: PV: YP: ANGLE DIRECTION TVD FL: Solids: Temp' °F SECTION COORDINATES DL~ STANDARD ALASKA PRODUCTION Daily l)rillin~ Report -- Pr~dhr~e II:~v i)¢ceml)er 2, 1988 a! 0600 hfs Ria' Nabors22F. Well' ~V-18(41-21-11-12) ,'\t:"tf # 12()771 APl' 50-029-21880 Al:t/Al~ount: Current Amount: 0600 Depth: Day' 24- Flour Ftg: 20 Current Operation: Rig released. Freeze protect 13-3/8" by %5/8" annulus w/150 bbls dry crude. Mud Type: WT: VIS' PV: YP: FL: ANGLE DIRECTION Solids: Temp' °F COORDI[NATES DLS · UB.$ URFA CE DIRECTIONAL ~URVEY [~]UIDANCE r~ONTINUOUS moo r. RO F!' NED Company , STANDARD ALASKA PRODUCTION COMPANY _ _ _ _ I I i ii I iii i Well Name w-~8 (,41-2!-11-1,2)(731' SNt,l182' WEL,SEC 21,TllN,R12E) iii III i ! i i L Field/Location PRUDHOE BAY, NORTH SLOPE,, ALASKA Job Reference Nq. Date 73047 28-N0V-88 Logmed By: Computed By;. WEST KOHRING SCHLUMBERGER GCT DIRECTIONAL SURVEY CUSTOMER LISTING FOR STANDARD ALASKA PRDDUCTIDN CO. W-lB (41-21-11-12) PRUDHDE BAY NOOTH SLOPE, ALASKA SURVEY D~TE: 28-NOV-BB ENSINEER: T. WEST METHODS OF C~MPUTATION TOgL LOCATION: TANGENTIAL- ~V:RAGED DEVIATION AND AZIMUTH INTERPOL&TION: LINEAR VERTICAL SECTION: HORIZ. DIST. PROJECTED ONTO A TARGET AZIMUTH ~F SOUTH $$ O:G 55 MIN EAST COMPUTATIgN DATE: 06-DEC-88 STANDARD ALASKA P~ODUCTION CO. W-18 (41-21-11-123 PRUDHOE BAY NORTH SLOPE, aLASKA INTERPOLATED VALUES ~OR EVEN 100 FEET OF TRUE SUB-SEA MEASURED VERTICAL VERTICAL OEV DEPTH D=PTH OEPTH OEG KELLY 0.00 0.00 -82.38 100.00 99.99 17.61 ZO0.O0 199.99 117.61 300.00 299.98 217.60 400.00 399.9,3 317.60 500.00 499.99 417.60 600.00 599.98 517.60 700.00 699.99 617.60 800.00 799.98 717.60 900.00 899.98 817.60 MEASURED OEPTH 1000.00 999.97 917.59 1100.00 1099.97 101'7.$9 1200.00 1199.96 1117.58 1300.00 1299.96 1217.58 1400.00 1399.95 1317.57 1500.00 1499.95 1417.57 1600.00 1599.95 1517.57 1700.00 1699.95 1617.$7 1800.00 1799.94 1717.56 1900.00 1899.94 1817.56 COURSE VERTICAL DOGLEG RECTANGULAR IATION AZIMUTH SECTION SEVERITY NORTH/SOUTH MIN DEG MIN FEET DEG/IO0 FEET 2000.00 1999.94 1917.56 2100.00 2099.94 2017.56 2200.00 2199.94 2117.56 2300.00 2299.93 2217.55 2400. O0 2399.93 2317.55 2500.00 2499.92 2417. 54 2600.00 2599.92 2517.54 2700.00 2699.9I 2517.53 2800.00 27~9.90 2717.52 2900.00 28)9.89 2317.51 0 0 N 0 0 E 0.00 0.00 0 17 S 21 28 E -0.21 0.06 0 9 S 25 5 E -0.03 0.17 0 10 S 51 59 W -0.12 0.37 0 15 S 29 12 E -0.11 0.13 0 19 S 34 44 i 0.18 0.05 0 21 S 40 52 E 0.54 0.11 0 21 S 42 26 ~ 1.00 0.06 0 19 S 35 13 E 1.42 0.22 0 17 S 41 28 i 1.71 0.20 3000.00 2999.88 2917.50 3100.00 3099.83 3017.50 3200.00 3199.88 3117.50 3300.00 3299.88 )217.50 3400.00 3399.89 3317.50 3500.00 3499.89 3417.50 3600.00 3599.88 3517.50 3700.00 3699.88 3617.50 3800.00 3799.87 3717.49 3900.00 3899.87 3817.49 0 21 S 57 51 E 2.15 0.24 0 39 S 72 29 E 2.96 0.07 0 38 S 72 59 E 4.07 0.12 0 36 S 67 10 E 5.11 0.22 0 23 S 57 21 E 5.94 0.31, 0 19 S 55 27 E 6.42 0.21 0 27 S 69 40 E 6.93 0.65 0 29 S 66 17 E 7.78 0.10 0 27 S 64 34 E 8.56 0.10 0 19 S 69 6 E 9.21 0.18 0 15 S S9 44 ¢ 9.73 0.21 0 16 S 54 5t ~ 10.13 0.10 0 19 S 25 23 i 10.46 0.05 0 22 S 11 5 E 10.67 0.39 0 30 S 1 39 E 10.73 0.33 0 39 S 0 0 W 10.75 0.10 0 39 S 13 27 : 10.89 0.11 0 48 S 37 18 5 11.41 0.25 0 52 S 59 5 5 12.53 1.55 0 42 S 89 33 E 13.B2 0.37 DATE OF SURVEY: BUSHING ELEVATION: ENGINEER: 0 22 N 78 36 F 14.76 0.94 0 18 S B2 2~ F 15.32 0.06 0 11 S 77 38 E 15.75 0.42 0 11 S 59 24 E 16.05 0.18 0 17 N 50 39 c 16.53 1.46 0 8 S 22 52 ~ 16.60 0.33 0 11 N 26 55 W 16.69 1.05 0 37 S q2 47 W 15.93 0.30 0 31 S 59 20 W 14.91 0.11 0 31 S 49 41 W 14.23 0.44 PAGE 1 28-NOV-88 82.38 FT T. W~ST 0.00 N 0.96 S 1.33 S 1.48 S 1.81 S 2.24 S 2.71 S 3.19 S 3.63 S 4.07 S CO0qDIN~TES HORIZ. DEPARTURE EAST/WEST DIST. ~ZIMUTH FEET FEET OEG MIN 4.44 4.74 5.07 5.43 5.85 6.18 6.50 6.83 7.20 7.49 0.00 E 0.00 0.23 W 0.98 0.06 W 1.33 0.1~ W 1.48 0.15 w 1.82 0.1~ E 2.24 0.49 ~ 2.76 1.35 E 3.88 1.64 E 4.39 7.70 7.92 8.31 8.88 9.68 10.71 11.85 13.00 14.14 14.44 2.06 E 4.89 2.88 E 5.55 3.97 E 6.44 5.01 E 7.39 5.83 E 8.25 6.31 E 8.83 6.81 E 9.41 7.65 E 10.26 8.43 E 11.09 9.07 E 11.76 14.29 14.34 14.39 14.50 14.30 14.35 14.41 14.32 14.65 15.15 9.59 E 12.30 9.99 E 12.74 10.31 E 13.24 10.50 E 13.75 10.55 : 14.32 to.ss t5.o3 10.66 E 15.94 11.16 E 17.14 12.27 E 18.72 13.56 E 19.80 14.49 E 20.35 15.06 E 20.79 15.49 E 21.14 15.78 E 21.43 16.27 E 21.66 16.33 E 21.74 16.42 = Z1.8q 15.66 ~ 21.21 14.64 E 20.71 13.95 E 20.59 N 0 0 E S 13 41 W S 2 33 W S 5 45 W S 4 39 W S 3 27 E S 10 12 E S 16 21 E S 20 21 E S 21 55 E S 24 57 E S 31 13 E S 38 2 E S 42 39 E S 44 55 E S 45 36 E S 45 21 F S 4~ 14 E S 49 30 E S 50 27 E S 51 13 E S 5l 35 E S 51 6 E S 49 96 E S 47 27 E S 44 34 E S 41 59 F S 40 38 E S 40 57 E S 43 11E S 45 23 E S 46 23 E S 47 5 E S 47 24 E S 43 41 E S 48 41 E S 4~ 44 E S 47 33 E S 44 59 E S 42 38 E COMPUTATION STANDARD ALASKA PRODUCTION W-18 (41-21-11-12) PRUDHOE BAY NORTH SLOPE, ALASKA CD. INTERPOLATED VALUES TRUE SU3-SEA COURSE MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH DEPTH DEPTH DEPTH DEG MIN DEG 4000.00 3999.86 3917.48 0 34 S 43 15 4100.00 4099.86 4017.48 O 33 S 42 0 4200.00 4199.85 4117.47 0 31 S lq 29 4300.00 4299.85 4217.47 0 20 S 9 4 4400.00 4399.84 4317.46 0 33 S 35 4500.00 4499.84 4417.46 0 36 S 24 26 4600.00 4599.83 4517.45 0 35 S 16 41 4700.00 4699.83 4617.45 0 24 S 22 23 4800.00 4799.83 4717.45 0 28 S 22 50 4900.00 4899.82 4817.44 0 32 S 0 35 5000.00 4999.79 4917.41 3 0 N 82 49 .5100.00 5099.37 5016.99 7 7 N 77 47 5200.00 5198.09 5115.71 Il 3 N 79 4 5300.00 5295.50 5213.12 14 42 N 79 33 5400.00 5391.63 5309.25 16 54 N 7q 35 5500.00 5486.91 5404.53 18 26 N 79 57 5600.00 5581.35 5498.97 19 53 N ~0 34 5700.00 5674.94 5592.56 21 24 N ?1 4 5800.00 5767.49 5685.11 23 10 N 82 2 5900.00 5858.74 5776.36 25 5 N 82 43 6000.00 5948.50 5866.12 27 ,~ N 83 11 6100.00 6036.75 5954.37 28 51 N 93 53 6200.00 6123.86 6041.48 29 32 N ~4 1~3 6300.00 6211.13 6129.75 28 47 N 6400.00 6299.20 6216.92 27 46 N 94 45 6500.00 6388.05 6305.57 26 46 N ~5 9 6600.00 6477.60 6395.22 26 15 N 85 45 6700.00 6567.60 6485.22 25 13 N 95 2 6800.00 6658.43 6575.05 24 22 N 86 27 6900.00 6749.63 6667.25 24 4 N 96 49 7000.00 6841.09 6758.70 23 41 N 37 16 7100.00 6932.75 6950.37 23 20 N 87 ~,5 7200.00 7024.66 6942.28 23 13 N ~8 25 7300.00 7116.48 7034.10 23 22 N 88 53 7400.00 7208.31 7125.93 23 19 N 89 59 7500.00 7300.13 7217.75 23 18 S 38 57 7600.00 7391.97 7309.59 23 22 S 38 15 7700.00 7483.64 7401.26 23 42 S ~7 44 7800.00 7575.15 7492.77 23 51 S 86 13 7900.00 7666.59 7584.21 23 53 S ~5 41 FOR DATE: 06-0 EC-88 EVEN 100 FEET OF VERTICAL DOGLEG SECTION SEVERITY FEET 9EG/IO0 13.50 0.07 12.81 0.15 12.39 0.49 12.41 0.94 12.77 0.1.3 13.33 0.23 13.62 0.37 13.70 0.25 13.39 1.20 13.31 0.61 15.01 5.33 23.77 4.34 39.23 3.87 61.27 3.10 88.23 I .46 118.00 1.53 150.28 1.45 184.93 1.73 222.26 1.84 262.69 2.06 306.31 1.98 352.91 1.54 401.67 0.46 450.16 1.11 497.24 0.97 542.84 1.19 587.15 0.61 630 . 54 1 . 14 672.23 0.60 713.13 0.44 D&TE OF SURVEY: KFLLY 8USH!NG ELEVATION: MEASURED DEPTH ENGINEER: RECTANGULAR COORDINATES HDRIZ. DE NORTH/SOUTH EAST/WEST DIST. AZ FEET FEET FEET DE 15.82 S 16.49 S 17.26 S 17.99 S 18.75 S 19.~9 S 20.58 S 21.32 S 21.95 S 22.96 S 23.19 S 21.33 S 18.39 S 14.22 S 9.26 S 3.83 S 1.70 N 7.35 N 12.89 N 18.28 N 23.69 N 28.99 N 33.96 N 38.77 N 43.14 N 47.21 N 50.72 N 53.83 ~ 56.61 N 58.99 N 753.46 0.47 61.12 793.34 0.40 62.73 832.69 0.31 63.99 872.29 0.51 64.96 911.86 0.42 65.33 951.45 0.56 65.02 991.04 0.32 64.00 1030.98 0.49 62.64 1071.29 0.70 60.58 1111.72 0.35 57.69 13.21 E 20.61 S 3 12.50 E 20.69 S 3 11.96 E 21.00 S 3 12.07 E 21.67 S 3 12.42 E 22.49 S 3 12.96 E 23.49 S 3 13.24 E 24.47 S 3 13.30 E 25.13 S 3 12.98 E 25.50 S 3 12.8q E 26.33 S 2 14.58 E 27.39 S !3.37 E 31.64 S 38.89 E 43.01 S 61.01 E 62.65 S 88.07 E 88.56 S 117.95 E 118.01 S 150.34 E 150.35 N 135.10 E 185.24 N 222.55 E 222.92 N 263.08 E 263.72 N PAGE 2 ZS-NOV-88 82.38 FT T. WEST PARTURE IMUTH G MIN 9 51 E 7 9 E 4 43 E 3 50 E 3 31 E 3 28 E Z 44 E I 56 E 0 35 E 9 17 E 32 9 47 36 6441 76 52 83 59 8:3 8 89 21 87 43 86 41 86 1 306.81 E 307.72 N 8 353.52 E 354.71 N 8 402.38 E 403.81 N 8 450.97 E 452.64 N 8 498.1~ E 500.00 N 8 543.83 E 545.~7 N 8 588.21 E 590.39 N 8 631.66 E 633-95 N 8 673.42 E 675.80 N 8 714.36 E 716.80 N 8 754.75 E 757.22 N 8 794.67 E 797.14 N 8 834.05 E 836.50 N 8 8?3.66 E 876.09 N 8 913.26 E 91~.59 N 8 952.85 ~ 955.06 N 8 992.42 E 994.49 N 8 1032.35 E 1034.25 N 8 1072.63 E 1074.34 N 8 1113.00 E 1114.50 N 8 5 35 E · 5 18 E 5 10 E 5 5 F 5 3 E 5 2 E 5 4 E 5 7 E 5 11 E 5 16 E $ 22 E 5 29~ s 5 44 E 5 54 E 5 5 E 6 18 E 6 31 E 6 46 E 7 1 E COMPUTATION DATE: 06-0EC-88 PAGE 3 STANDARD ALASKA PRODUCTZON CO. W-18 C41-Z1-11-12) PRUDHOE BAY NORTH SLOPE, ALASKA DATE OF SURVEY: 28-NOV-88 KELLY BUSHING ELEVATION: 82.38 FT ENGINEER: T. WEST INTERPOLATED VALUES FOR EVEN 100 FEET OF ME*SURED DEPTH TRUE SUB-SEA COURSE MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH DEPTH DEPTH DEPTH DEG MIN D~G M[N 8000.00 7758.00 7675.63 23 57 8100.00 7849.29 7766.91 24 11 8200.00 7940.48 7858.10 24 22 8300.00 8031.56 7949.18 24 8 8400.00 8123.11 8040.73 23 16 8500°00 8215.28 8132.90 22 25 8600.00 8307.98 8225.60 21 35 8700.00 8401.24 8318.86 20 43 8800.00 8495.00 8412.62 19 44 8900.00 8589.34 8506.96 18 56 9000.00 8684.22 8601.84 18 8 9100o00 8779.24 8696.96 18 16 9200.00 8874.12 8791.74 18 41 9300.00 8968.84 8886.46 18 50 9400.00 9063.45 8981.07 18 48 9500°00 9158.22 9075.84 18 32 9550.00 9205.62 9123.24 18 32 VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUTH FEET DEG/IO0 :EET ~EET FEET DES S 85 Z E 1152.17 S 83 55 E 1192.88 S 83 12 E 1233.73 S 92 47 E 1274.78 S 82 27 E 1314.78 S 81 55 E 1353.31 S 81 5 E 1390.50 S 80 24 E 1426.24 S 79 10 E 1460.55 S 78 17 E 1493.14 0.46 0.23 0.38 0.76 0.98 0.83 0.60 1.21 0.90 1.10 54.43 N 1153.40 E 11~4.68 N 87 17 E 50.45 N 1194.04 E 1195.11 N 87 34 E 45.83 N 1234.81 E 1235.66 N 87 52 F 40.80 N 1275.77 E 1276.43 N 88 10 F 35.71 N 1315.68 E 1316.17 N 88 Z6 E 30.47 N 1354.13 E 1354.47 N 88 42 E 24.91 N 1391.22 E 1391.44 N 8,~ 58 E '~ 19.06 N 1426.85 E 1&Z6.98 N 89 14 E 12.85 N 1461.05 E 1461.10 N 89 29 E 6.35 N 1493.53 E 1493.54 N 89 45 E S 76 55 E 1524.12 S 77 14 E 1554.63 S 77 58 E 1585.61 S 78 2 E 1617.08 S 78 19 E 1648.89 S 78 7 E 1680.24 S 78 7 E 1695.87 0.41 0.20 0.65 0.64 0.70 0.00 O.OO 0.51 S 1524.38 E 1524.38 S 89 58 E 7.42 S 1554.77 E 1554.78 S 89 43 E 14.20 S 1585.63 E 1585.69 S 8g 29 E 20.87 S 1616.97 E 1617.11 S 89 15 E 27.53 S 1648.66 E 1648.89 S 89 2 E 34.09 S 1679.90 E 1680.25 S 8~ 50 E 37.36 S 1695.46 E 1695.88 S 88 44 E STANDARD ALASKA PRODUCTION W-18 C~1-21-11-12) PRUOHDE BAY NORTH SLOPEs ALASKA COMPUTATION DATE'. 06-DEC-88 DATE OF SURVEY: 28-NOV-8~ KELLY BUSHING ELEVATION: 81.38 FT ENGINEER: T. WEST INTERPOLATEO VALUES FOR EVEN 1000 FEET OF MEASURED DEPTH TRUE SUB-SEA COURSE MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH DEPTH DEPTH DEPTH DEG MIN DEG 0.00 0.00 -82.38 0 0 lO00.O0 999.97 917.59 0 21 2000.00 1999.94 1917.56 0 15 3000.00 2999.85 2917.50 0 22 4000.00 3999.86 3917.48 0 34 5000.00 4999.79 4917.41 3 0 6000.00 5948.50 5866.12 27 8 7000.00 6841.08 6758.70 23 41 8000.00 7758.00 7675.63 23 57 9000.00 8684.22 8601.84 18 8 VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZo DEPARTURE SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUTH FEET DEG/IO0 FEET FEET FEET OEG MIN N 0 0 E 0.00 0.00 S 57 51 E 2.15 0.24 S 69 4~ E 9.73 0.21 N 78 36 5 14.76 0.94 S 43 15 W 13.50 0.07 N q2 49 E 15.01 5.33 N q3 ll E 306.31 1,.9~3 N 87 16 E 753.66 0.47 S 85 2 E 1152.17 0.46 S 76 55 E 1524.12 0-41 9550.00 9205.62 9123.24 18 32 S 78 7 E 1695.87 0.00 N 0.00 E 0.00 N 0 0 E 4.44 S 2.06 E 4.89 S 2~ 57 E 7.70 S 9.59 E 12.30 S 51 13 E 14.29 S 14.49 E 20.35 S 45 23 E I5.82 S 13.2I E 20.61 S 39 51 E 23.19 S 1/-+.58 E 27.39 S 32 9 E 23.69 N 306.81 E 307.72 N 85 35 E ~ 61.12 fl 754.75 E 757.22 N 85 22 E 54.43 N 1153.40 E 1154.68 N 87 17 E 0.51 S 1524.38 E 1524.3~ S 89 58 E 0.00 37.36 S 1695.46 E 1695.88 S 88 44 E STANDARD ALASKA PRODUCTION CO. W-18 (41-21-11-12) PRUDHDE BAY NORTH SLOPE. ALASKA COMPUTATION D~TE: 06-0EC-88 KELLY DATE gF SURVEY: BUSHING ELEVATION: ENGINEER: PAGE 5 28-NOV-88 82.38 FT T. WEST MEASUR DEPT O. 82. 182. 282. 382. 482. 582. 682. 782. 882. INTERPOLATED VALUES TRUE SUB-SEA COURSE ED VERTICAL VERTICAL DEVI!ATION AZIMUTH H DEPTH DEPTH DEG MIN DEG MIN O0 0.00 -82.38 ,,0 0 N 0 0 39 82.38 0.00 0 16 S 23 56 39 182.38 100.00 0 10 S 26 13 39 282.38 200.00 0 8 S 61 36 40 382.38 300.00 0 14 S 24 29 40 482.38 400.00 0 19 S 34 11 40 582.38 500.00 0 20 S 38 15 40 682.38 500.00 0 22 S, 43 56 40 782.38 700.00 0 20 S 41 24 40 882.38 800.00 0 17 S 37 13 FOR 982.41 1082.41 1182.41 1282.42 1382.43 1482.43 1582.43 1682.43 1782.44 1882.44 1982.44 2082.44 2182.44 2282.45 2382.45 2482.45 2582.46 2682.47 2782.48 2882.49 2982.50 3082.50 3182.50 3282.50 3382.50 3482.50 3582.50 3682.50 3782.51 3882.51 982.38 900.00 0 20 S 54 30 1082.38 1000.00 0 36 S 72 50 1182.38 1100.00 .0 38 S 73 14 1282.38 1,~00.00 0 36 S 68 44 1382.38 1300.00 0 27 S 58 2 1482.38 1400.00 0 19 S 55 3 1582.3,3 1500.00 0 22 S ~4 43 1682.38 1600.00 0 30 S 67 45 1782.38 1700.00 0 29 S 6'4 4,6 1882.33 1800.00 0 21 S 67 52 1982.3,,3 1'900.00 0 18 S 58 45 2082.38 2000.00 0 16 S 57 55 2182.38 2100.00 0 19 S 28 4~ 2282.38 2200.00 0 20 S 15 34 2382.38 2300.00 0 29 S 0 25 2482.38 2400.00 0 3~3 S 0 9 2582.38 2500.00 0 39 S ll 26 2682.35 2600.00 0 47 S 32 32 2782.39 2700.00 0 56 S 51 55 2882.3`3 2800.00 0 45 S ~5 39 2982.38 2900.00 0 2~ N 75 8 3082.38 3000.00 0 18 S ,~2 11 3182.38 3100.00 0 12 S 80 23 3282.38 3200.00 0 13 S 66 18 3382.38 3300.00 0 24 N 56 43 3482.38 3400.00 0 7 S 33 54 3582.3~3 3500.00 0 8 N 29 54 3682.38 3500.00 0 '~6 S ~3~ 36 3782.38 3700.00 0 34 S 63 35 3882.38 3800.00 0 27 S 47 3 EVEN 100 FEET OF SUB-SE~ DEPTH VERTICAL SECTIgN FEET OOGLEG RECTANGULAR SEVERITY NORTH/SOUTH OEG/IO0 FEET 0.00 -0.25 -0.06 -0.08 -0.15 0.12 0.47 0.92 1.35 1.66 0.00 0.00 N 0.16 0.88 S 0.14 1.29 S 0.14 1.45 S 0.10 1.79 S 0.09 2.16 S 0.15 2.63 S 0.10 3.10 S 0.18 3.56 S 0.09 4.00 S 2.77 3.88 4.93 5.83 6.33 6.82 7.64 8.43 9.11 0.17 4.38 S 0.38 4.68 S 0.05 5.02 S 0.06 5.37 S 0.45 5.78 S 0.24 6.12 S 0.47 6.45 S 0.21 6.77 S 0.26 7.14 S 0.12 7.45 S 9.65 0.27 7.61 S 10.06 0.07 7.81 S 10.41 0.27 8.22 S 10.64 0.11 8.77 S 10.72 0.16 9.53 S 10.74 0.19 10.50 S 10.84 0.21 11.65 S 11.25 0.87 12.81 S 12.30 0.40 13.96 S 13.60 0.50 14.43 S 14.63 0.26 14.33 S 15.23 0.04 14.33 S 15.69 0.16 14.38 S 15.99 0.29 14.4,~ S 16.43 0.77 14.36 S 16.62 0.63 14.31 S 16.70 0.79 14.45 S 16.11 0.23 14.31 S 15.05 0.74 14.56 S 14.34 0.33 15.05 S COORDINATES HORIZ. EAST/WEST DIST. FEET FEET 0.00 E 0.00 0.27 W 0.92 0.08 W 1.29 0.11 W 1.46 0.18 W 1.75 0.08 E 2.16 0.42 E 2.67 0.86 E 3.22 1.29 E 3.78 1.58 E 4.30 I. 98 E 4.80 2.69 E 5.40 3.78 E 6.28 4.83 E 7.22 5.73 E 8.13 6.22 E 8.73 6.70 E 9.30 7.51 E 10.11 8.30 E 10.95 8.97 E 11.65 9.50 E 12.22 9.92 E 12.66 10.26 E 13.15 10.47 E 13.66 10.55 E 14.21 10.55 E 14.89 10.62 E 15.76 11.02 E 16.90 12.04 E 18.43 13.33 E 19.64 14.36 E 20.28 14.96 E 20.72 15.42 E 21.08 15.72 E 21.37 16.16 E 21,62 16.35 E 21.73 16.43 E 21.88 15.84 E 21.35 14.78 E 20.75 14.06 E 20.60 DEPARTURE AZIMUTH DEG MIN N 0 0 E S 16 52 W S 3 39 W S 4 16 W S 5 55 W S 2 6 F S 9 4 E S 15 26 E S 19 52 E S 21 34 E S 24 17 E S 29 50 E S 37 0 E S 42 0 E S 44 44 E S 45 27 E S 46 3 E S 47 58 E S 49 18 E S 50 18 E S 51 5 E S 51 33 E S 51 18 E S 50 2 E S 47 54 E S 45 6 E S 42 21E S 40 41 E S 40 46 E S 4~. 44 E S 45 3 E S 46 14 E S 47 0 E S 47 22 F S 4~. 22 E S 48 48 E S 49 40 E S 47 55 E S 45 Z5 E S 43 3 F CDMPUTA'TION STANDARD AL&SKA PRODUCTION CO. W-lB (41-21-11-12) PRUDHOE BAY NORTH SLOPE, ALASKA INTERPOLATEO VALUES FOR TRUE SUB-SEA MEASURED VERTICAL VERTICAL DEPTH DEPTH DEPTH COURS~,- DEVIATION ~ZI,~4UTH DEG'MIN DEG MIN 3982.52 3982.38 3900.00 4082.52 4082.38 4000.00 4182.53 4132.35 4100.00 4282.53 4282.38 4ZO0.OO 4382.53 4382.37 4300.00 4482.54 4482.38 4400.00 4582.55 ~582.38 4500.00 4682.55 4682.38 4600.00 4782.55 4782.38 4700.00 4882.56 4882.38 4800.00 034 S 44 Z W 0 33 S 43 5 W 0 31 S 26 19 W 0 24 S !5 5:R E 034 S 32 31 : 0 35 S 2R 1~ ~] 0 36 S 12 15 E '~ 0 20 S 21 46 W 0 24 S 29 28 W 034 S 3 19 W 4982.57 4982.38 4900.00 5082.90 5082.38 5000.00 5184.01 5182.38 5100.00 5286.44 5282.38 5200.00 5390.34 5382.38 5300.00 5495.22 5482.38 5.400.00 5601.10 5582.38 5:500.00 5707.98 5682.38 5600.00 5816.24 5782.38 5700.00 5926.15 5882.38 5800.00 2 6 N 8712 6 24 N 77 2 10 26 N 79 19 14 15 N 79 33 16 44 N 79 36 18 21 N 79 55 19 54 N 80 35 21 32 N 81 T 23 28 N 82 9 25 38 N 82 50 6038.20 5982.38 5900.00 6153.28 6082.38 6000.00 6267.14 6182.38 6100.00 6380.97 6282.38 6200.00 6493.65 6382.38 6300.90 6605.34 6482.38 6400.00 6716.33 6582.38 6500.00 6826.27 6682.38 6600.90 6935.85 6782.37 6700.00 7045.09 6882.38 6800.00 27 51 N 33 26 29 28 N 84 13 29 6 N 84 23 27 57 N 84 45 26 49 N 95 T 26 13 N 85 47 25 2 N ~6 5 24 I6 N ~6 3& 23 54 N 86 5~ 23 34 N 87 40 7154.00 6982.38 6900.00 7262.84 7082.38 7000.00 7371.77 7182.38 7100.00 7480.67 7282.38 7200.00 7589.55 7382.38 7300.00 7698.62 7482.38 7400.00 7807.91 7582.38 7500.00 7917.27 7682.38 7600.00 8026.68 7782.38 7700.00 8136.27 7882.38 7800.00 O~TE: 06-DEC-88 EVEN 100 FEE VERTICAL DOG SECTION SEV FEET DEG KELLY T OF SUS-SE~ DEPTH LEG RECTaNGULaR ERITY NORTH/SOUTH /100 FEET 13.62 0.08 15.69 S 12.92 0.22 16.37 S 12.35 0.30 17.11 S 12.36 0.40 17.89 S 12.57 0.15 18.60 S 13.24 0.28 19.43 S 13.57 0.32 20.40 S 13.74 0.48 21.22 S 13.~5 0.19 21.84 S 13.32 0.20 22.78 S 14.23 5.29 23.27 S 21.81 4.06 21.77 S 36.31 4.06 18.95 S 57.92 3-44 14.85 S 85.52 1.58 9.76 S 116.49 1.54 4.10 S 150.65 1.44 1.76 N 187.77 1.77 7.81 N ~28.67 1.87 13.78 N 273.76 2.11 19.69 N 323.80 1.81 25.74 N 378.24 0.83 31.63 N 434.36 0.94 37.23 N 488.39 0.96 42.32 N 540.01 1.26 46.97 N 589.51 0.70 50.89 N 637.45 1.04 54.31 N 583.00 0.30 57.25 N 727.68 0.56 59.79 N 771.53 0.53 61.91 N 23 11 N ~8 12 E 23 22 N 88 38 E 23 19 N 89 41 E 23 18 S 89 13 E 23 21 S 88 19 c 23 42 S R7 44 E 23 51 S 86 lO E 23 53 S 85 33 E !4 Z S 94 42 E 24 11 S 83 40 E 814.62 0.38 63.46 N 857.53 0.20 64.62 N 900.69 0.46 65.30 q 943.81 0.54 65.13 N 986.90 0.26 64.12 N 1030.43 0.48 62.66 N 1074.49 0.60 60.35 N 1118.71 0.30 57.16 N 1162.99 0.66 53.46 N 1207.67 0.42 48.86 N DaTE OF SURVEY: BUSHING ELEV&TION: ENGINEER: PASE 6 28-NOV-88 82.38 FT T. WEST 13.33 E 20.59 S 40 20 12.61 E 20.66 S 37 36 E 12.03 E 20.92 S 35 5 12.03 E 21.56 S 33 54 E 12.32 E 22.31 S 33 31 E 12.88 E 23.31 S 33 32 E 13.19 E 24.30 S 32 52 13.34 E Z5.06 S 32 9 E 13.04 E 15.44 S 30 50 E 12.89 E 26.18 S 29 30 E 13.80 E 27.06 S 30 39 E 21.40 E 30.5'3 S 44 30 E 35.96 E 40.64 S 6Z 12 E 57.65 ~ 59.53 S 75 33 E 85.35 ~ 85.91 S 83 28 E 116.44 E 116.51 S 87 59 E 150.71 E 150.72 N 89 19 E 187.95 E 188.12 N 87 37 E 228.97 E 229.39 N 86 33 E 274.18 E 274.88 N 85 53 E 324.34 E 325.36 N 85 27 E 378.90 E 380.22 N 8~ 13 E 435.1~ E 436.73 N 85 6 E 489.27 E 491.10 N 85 3 E 540.99 E 543.02 N 85 2 E 590.57 E 592.76 N 85 4 E 638.59 E 640.89 N 85 8 F 6~4.20 E 686.59 N 85 13 E 728.93 E 731.38 N 85 18 E 772.83 E 775.31 N 85 25 E 815.96 E 818.42 N 85 33 E 858.90 E 861.33 N 85 41 E 902.08 E 904.44 N 85 51 E 945.21 E 947.45 N 86 3 E 988.28 E 990.36 N 86 17 E 1031.79 E 1033.69 N 86 31 E 1015.82 E 1077.51 N 86 47 E 1119.99 E 1121.44 N 87 4 E 1164.20 E 1165.43 N 87 22 E 1208.81 E 1209.80 N 87 41 E COORDINATES HORIZ. DEPARTURE E~ST/WEST DIST. ~ZlMUTH ~EET FEET DEC MIN STANDARD ALASKA PRODUCTION CO. H-lB (41-21-11-12) PRUDHOE BAY NORTH SLOPE, ALASKA CgM.DUT~TIgN D,~TE: 06-DEC-88 PAGE 7 DATE OF SURVEY: 28-NOV-88 KELLY BUSHING ELEVATIDN: 82.38 FT ENGINEER: T. WEST INTERPOLATEO V~LUES FOR EVEN 100 FEET OF SUE.-SEA DEPTH TRUE SU3-SE~ COURSE MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH DEPTH DEPTH DEPTH DEG MIN DEG M[N VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE SECTION SEVERITY NORTH/SOUTH EAST/WEST gIST. AZIMUTH FEET DEG/IO0 ~EET FEET FEET DEG MIN 8246.02 7982.38 7go0.o0 24 24 8355.59 8082.38 8000.00 23 40 8464.38 8182.38 BlO0.O0 22 42 8572.46 8282.38 BZO0.O0 21 48 8679.84 8382.38 8300.00 ZO 55 8786.58 8482.37 8400.00 20 2 8892.63 8582.38 8500.00 19 0 8998.07 8682.3~ 8600.00 18 7 9103.31 8782.38 8700.00 18 17 9208.73 8882.38 8800.00 18 43 9314.31 8982.35 8900.00 18 55 '9419.98 9082.38 9000.00 18 41 9550.00 9205.62 g123.24 18 32 S 83 I E 1252.67 S 82 44 E 1297.18 S 82 10 E 1339.74 S 81 18 E 1380.45 S DO 28 E 1419.15 S 79 25 E 1456.04 S 78 20 E 1490.78 S 76 5's E 1523.53 S 77 15 E 1555.65 S 78 l E 1588.37 S 78 3 E 1621.63 S 7B 11 E 1655.20 S 78 7 E 1695.87 0.40 0.93 1.27 1.06 1.82 0.88 0.39 0.18 0.36 0.67 0.56 0.00 43.55 N 1253.72 E 1254.47 N 88 0 E 37.9T N 1298.13 E 1298.69 N 88 32.33 N 1340.59 E 1340.98 N 88 37 E 26.48 N 1381.20 E 1381.45 N 88 54 E 20.25 N 1419.78 E 1419.g3 N 89 10 E 13.70 N 1456.56 E 1456.62 N 89 27 E 6.83 N 1491.18 E 1491.19 N 89 44 E 0.37 S 1523;79 E 1523.79 S 89 59 E 7.65 S 1555.78 E 1555.80 S 89 43 E 14.79 S 1588.37 E 1588.44 S 89 27 E 21.83 S 1621.50 E 1621.65 S 89 13 E 28.83 S 1654.95 E 1655.20 S 8g 0 E 37.36 S 1695.46 E 1695.88 S 88 44 E SCHLUMBERGER O I RECT I ONAL. SURVEY COMPANY STANDARD ALASKA PRODUCTION WELL W-18 (41-21-11-12) FI ELD PRUOHOE BAY COUNTRY U.S.A. RUN TWO DATE LOOOED 28 - NOV - 88 REFERENCE 7:3047 WE'LL' (731 ' "W-1 8 (41 - 21 - 11 - 1 2'"--, SNL, 1182' WEL, SL 21, TllN, R12E) ~'-'-HORIZONTAL PROJECTION NORTH 2000 ! ~00 ! 000 SOO -500 - 1000 -lO00 ~F 7'~047 SCALE : I/SO0 [N/FT ~,.~.~ ..~..~.~..-i~'~'+'1 "~'"~"~ ...... ..... ~"~I..~-~,.J-L~..-~-~-- --~-~--L.~.-.~..-~..~-.~ ~ ~ ~ ...... ~"f-~"-~ ..... ~..4-.~..~ ...... ~"-~"'~-'~"' F"~-"~'"~"4'~i-~ ~-~-J~]~ ~-.i~ L~~''~'-~ ...... ~' ~ -~ ;"'~ ~ ~_L_'"4"4"'~""~ i. ~ ~ ~ ~i_~ ~ i~"'~""b'~'"~ ...... ~..4...; ....... L~ ~h'~'''~'-~i_~'''~ ....... ~_iL"' ....h.~-..~...~....~i! ~ ..~..4..-~..~... ,.~_~..~...~ ...... ~..++.+.-~.-+...~..+--~-+.+.-~..-~-+......~.-L.~..~...L.LL..L~ ...... ~"~"~"'~" ?t"~'"~ ...... ?'f'?"f"r'T"~"-r"T ....... ~-'~"f"f"I"-?'?"?"?',"-?"f'i ....... ??"-r" "??'f"f"?'?'?? .... ~--++--~ ....... ~..¢4.--~-..~----b+--.b¢--.~--.~---~..-b~ ....... ;~-~.~...~..-'q-~'%~ ..... ..~..~...~...~...~'+4-~ ..... ~..+--~..-~.....¢.+.-~..+...,..~..~...~...~-.~.4..~.4-~... "'?'~'"~"'~"~"+"?'?'~ ..... ~'-~"+'+"'"+'+'-~"'~ ....... ~"++"~ ...... ~-+'+' '~ ....... ~"?'"'~"'~ ....... ........ ~'"~"'~"-~ ...... ~"'~"'?+"~ ....... .... ..... ...... ~ ~i ~;, *~iii~ '!'"l"w'~ .... h'f"f"'f ..... ~-'f"-f"i-'-~ff--i"-t ..... ?'?'f"i'-~"-???f'"r"~-+"i-i'''?'':~''?''¢'??'~''4'''~'?'~-w'' ,H-'sS'-'j-+'+"f"~"++-i"-h+--f-¢--~--+- '~i~ ~ ~i !~ :~ ~:,~i~': : ~:~i ~ ~ ~'.~: ;¢: x: :::: ::: :;::: t: :?: :i:: ..... ,--- w-~T-~--r-m--~"-r-?~"-t---h,'--t---t--~"-r-' ::::::::::::::::::::::::::::::,,, ,,, ~: ~ ::::::::::::::::::::X:::::::~,~ ,~,~ ::::::::::i::Z:~ XX:::;::Y:~ ~ :::~::;:, ::::::::::2:::::::::::~ ~,~ .~::::]:::iX:::: ~-+H'-.~.-,~--b-i-.-+---~ ....... ~'--~---~--+,-~---+-+--b--~ ....... ~-'-~,.-~---~---t.--+.-~-+..-~-- ".?-+'-+.-~..+-~--.+'-.~---+ ...... ~---~--~..-.~--~--+-+-~.-.~ ...~.-74--4.-+-P4--,+.-.?-.4...~..-+-.7! '-'+..+'-+'-4'-- "-~-~'--~'"~ ...... ~--4-+4--.f--~.-+.-f-,~ ........ H-.-f-4---f--f.-?-k-~ ....... H'--H--f--H--++-'--4---H--f-4--+-f-4'-.~--- .++++++-4..4.-4 ---+-+-'+--++-H-'+-'~ ...... ~..+-.~.-+..4..+..+-..~..+.....4-.+-4.--~ ....... ~..-~..~ -i-ti"'~l"-f-¢'i"t"""t'-i'"t!-l'-i'-i'--h-t ..... t'h't"i-'t"'t"-h'f-i ....... ti"i-t'1?"~-'t'"f" 'i"'t'i-t!-'ti-Pi","'f'Yi'+l'--F-?"t-""4"4"+-~ ...... f'++'+-"!"'~'++' -T'T"T"T"T-r-r"T'-~ ....... %'r'T'-r'T"?'r'-r"r ...... %-f-T"'~"T-'%-r"?T ....... ~---~'-~----r-r--?f--T--T ...... r-v~---r-cv-r--r-'T ...... T-T-T"i t"ff"ff"'T'"T ...... f...ff...ff...~ ...... f"f"f'4 ..... h?-?ff"""ff"-h+.4 .... ~'-+"i"-b'4'--h+--~--}-~ ,-+-ff--+--+-~--,+..~-+-,~ ...... +"f"+"'~--~-~'-'~--+"-i ...... ~--*---~-+.-l-,-~-~-.~ ...... *-+-i-*-. ,..4..4..,~..4......;.~...~...; ..... ¢..4...~..~., ..+4...~..~...i · 4-4...;...1...~-~..-~...¢-.;.. : i i i . ! ; ; ; ; ; ; ]' ; ; '. ; ' ' ; : ~ ' : : ' ' ~ ....... i : '. ' ~ ' ' : ~ ' :. : ~ ' : : ] ; ' '. ' .... ~.--~..-~--¢--~---~---L--~.--~ ....... ~-,-~,..~--4,--t...~..-;.-,~4 ...... ~----P-4.-,~---~--4--~,-.~,--~--- ---~,.-;-4--~-~,--~--4-.-~.--~ ...... ~-4--~--*.- -e-.,~,--~..4-,- ,,e--~,,-~,,-~ ..... ~,,,~---~,,4-.--4,-4,-,~.-~-,-; .,4--*-4,,4 · '---f.-i...i--i---f.i-f--h-?-i.--?.-h--f--i-+.-?.?+.4 ...... i...?-+-+-t.-4-+-4-.~ ...... >..-~- ++.+~---~..-b.+ ...... ~--~-+-.~ ..... F--~..+--+.-..-.+..~...~..-~ ..... 4.-+-+.-F.-..-+.-~-4-..+-.,.-4.-+4.-4 .... · i+.+.4-""+++.4..-~ '"??'"~"*'-?'"?"-'-' "~"'""?' ...... ?'"" ....... ?'-'"'?"'?'-'~'?"?'t ....... "??"'?'?~"'"'? ..... ?'""i '""-'?""'-?'?"' ..... ?..-,.-...?..?-.,...,.?? .... '++++'++++~ ""+++' ::i:%iX::]:::iX:%:: q---i-+"f'-~-+--+-+-+q.--+q-+4 ...... H-+-'f-- ..?f.4--+--.?f.4-4- .-4.-i.-.f.-h...-+.+..i---i-~ '--?'?--r--?*-~---?-'?'~ ...... r-.t-?'t .... ?-~-+?- -.4 --L4..4 ........ ~...~...~...~..- ..4..4...~...; ...................... 4...;.-L.~ .............. "================================================ :::~:~-+---+-.+-~.-i-+~,-~-.~-~--+.- "~.--+ ...... ;-*-.;-.; ....... ~--.;..-;-.-;.--..*-*.-:-.;.-~.--;..-;--.;.,*-.,--*.--~--x-. +~--.-4-¢-~.-,,, ~~ ~,,~-¢~~ fT!-';-T? ..... f"'i E ~~c~-'~''~4'4''4-~''¢'N-4 ..... N..-~..4--..¢44~- ¢¢44.~¢44-¢.---.4-444-~..44.4-4 ....... ~444-.L.~..444...: 4..4..4-4..4-4-444.-44..¢4-q-44-4-4-,-4-44.4....-.44--N.-. -~.-4-;-4.4.44-. 4.4-~-. .... g..4.--g-..~ ...... *.-4-.*..-g... -4..4..4-.4-.~-4...~...~...~ ...... L..g..4...~..~..~..~-~-.~ ..... 4--+-¢---+ ....... F-+..4--.+--. -4--¢'+-¢'-"-¢-'+'-¢"4... -.4-+.+4 ....... :: :: :: ::::::: :: ::: ::::::: :..T?.?T,.??TT. ........................ ...... ~-~_.~..~-~.~_.,.~...,..~ ~ ~ ~ ~ ..~.~..~_.~..4.~_,.~...~ ~,~ ..~.-~..~--.~..~-4-~..~.-~ -ff-~-~"'~ ..... h%"~"'ff ...... ?"f"f'4"'{'"f'??h- "'T-7-~-TT~"'T'T"~'" F'T'%i"'T ....... ?-'l-'l"1-' "T'~"'~"i'""T'?i-T" · "t-'?'?"?m "~--t"'?'?" '-!--r"~'? ...... ?'~-"?~?-' r-~.-?--~---~-. -'--4-~ ,-4 ~--~--'- -¢-4 ¢ ~-- ~. '.,.'..'__ : : ; : / : ; : : I : ! : : / i i ~ ! ! ~ ~ ~ ~ ~ i ! I i ! ~ ~ i ~ ~ i i I i ~ i i i , i ~ ! ,, ,, ~,~ "T'T"~"~-'l'"r"r-r-r ...... r"~--:---~-~---~-~--r~'--:-r'i%~---J-~--r-~-~----~-'~ ...... ~-~-~--~ ..... v'r-%'r-"T'r'~"'~-"'~"'r'w"'"r~'"~"-r"','~-'r'T-V"-'~-~-~"%- k-; 4-i-; I¢4-4-4--..44-!4-.1...~.1..4-- ~..4-; 4- -4-.N4... -4-¢-; ;.--4-4-4-4--4-4-4 4.-~-44..¢.4-...4-N..$-4 ...L4.+4-.-;.L.i-;--, ~.?~_.::~:;.~?:: ......... ,..~_....~ ........ ~_....~ ......... ~ ..... ,_;.._,...~.~...~_.,..._~_., ..... ,..._~...,_~......_~_~_~_., ....... ,..,_~ .......... ,...,....,...,_....~...,...,_.. ....... ...., ....... ,.....~... ....... . ....... ..._, ...... ~-¢-4 XX..].;% []X:;;i;:t: ;;i;;:~X:: ~:: :: ;;: :; Z::: :;: -~.+-.+4.- -+..+q-+.--++4--+-~_4.4.4_;_ ;-.44.,4.4..,,,.4-4-.;4 ...... +.44.-4- ,_~.+..;.4...: ..4_4....~... %ff'+'i"~ 'I-!-i-!"' r~---?l-4-?--ri-- ::;:;:;q::1%~::~:: ~q:?~:: -fi-fi-':"';"';"';" '~"';"~"';""-~";-~-~-: .~........?..~.~.-..~...+..~-+-.~...;..+.~...~...+-.~.++..~...+...~...+...+...~..4..~ ..............~ ........... -.~-4-.~--~---:--4...+...+--.~ ...... ~.--~..~--+--4-i-+.++-,--!.--?i---?.i-i-i-f!--- 4-4-44-4 44.4-,¢- .4...l.4.--bt.N..-N--..4..4-.L~-.~.4..4-4-4-. 4.4-44.-4-~-.i.4... -4..4-4,...L~-.l-q...4..-i,..:...l-44...N.¢.4..¢,4 ....... h¢..l...l ...... ;,,.;...;,.-~ ....... ~...~,.44-., ..44.,44 ~-4--.t.~+4--+-- .-4..4..+.4..+..;.4-~-4--.-~+.;-.;-.~-;4-.i-;. ~-4-~;---4-.;-;...;..-4...;..4-.;..4-~-;4-.;...:...~-.;...;...;.4..-~...;...;..,~.....-4...;.4...;.-4...;...;...;..4 ....... f-.f..f..f-.4 ..+.+.+-4 .......... ff-T-'?%t'--r~'-~-~---?~--~-.vfi--~-r~- ~'~-~--ff-~--r--t- -?--~-~--ff-..~-'r4-ff-~-, .-.?-~-f-4.-4.--r.-.:-..f-~.-.'...ff..T.-r.~--~ '-'f'-?":"~--- ,..+-+.-i-~--, ~-~--~H,-~-~-~ ~'"f-4'--f-ff-~---Y+--h~-"~--ff-4-'k-~'"ff-?~--,-e~-~-.- -ff~--~-+--r+-+-+'+q-:t++'+-4-+-+--f-'f-'~--+"~--+-+- '-+-+'-~+- "ff'"i-'~-~ ..... ;.--~--.~..-~.--~..-~--F.~ .... '"'" ', ........... 4 ............ ~ ..... l .................. 4 .................. ¢-~ ...... ~ ..... ?4..;,...,-., ............................ ,..~."" ~-~ ..+4.-+-+-- "'1?~"~-+'T'~"~-%d'~' !,~ "+'T'%'~-'~'"~'~"~'T'''i'i ,,i, ...T..!.T..r.4_~_~_~..r.i,~! ~ ! i , , ~ , i ic~_.:_=_H_.:~_~_~,',, ..... ?'f"ri'q"~"'?~-'f'"':' ': ..~-..:.--:-:-.' ' ' ~ ' ' ' ' '~.--~...?-:..=-. .-4444.-...¢+-4-+-- ' ' 4- .-~-+-4-..-++-+-+---+-+-++. ~+¢+. -!-+-i~ ...... +..4-+.+---+.~-.+-+..~--~-~-+.+4-.+-++.i ...... t-~-i..+.4..+.+.+.+.- ..+.+-~-+..~...+-.+-.+..4-.. -TTTT' -4-;.; L. ' ........................ ,, ', ~..~.4..~_~. ..;.;;4.. ~.,.,..;..~..~..~4._..~..~..~_,_.,_~_,......4...~_;_; ...... ;.~..~_.;...~...;..;..:...f._L;..;..;.....44..N ...... ;4.¢.4-....4...N-;.. .~-;~..~ .... ~ ~;4--~~ -~¢¢ ¢ ~-~-' :--k4--~-- ~.4-4-¢..-;4-.i-¢--4-.~4-+...-4-4-4-4.- -4--~4..4-..4.4..4-.;...~ "'+¢"+q-":¢~;:~:: ~%]%'+~ ] -+.,~+- .~-,~ ...... **-+-+- 4.4-4~.. -4-;-4-~..~-.~- -;4-4-4- -4-i-4-4.-.~.-}-q..4.-4-~"++"i-~ '~ ~'f~'~-' "ff'f'~'i-'H-'H ..... ~'~':~'I'~-T'?T"'T"m"~ ...... H'i'~ .... f!"?i-Tt-'f"H-'"?'t"'t'-r"f"f"H'""+"+"+'~" ~'~'" -,~00 0 ~00 1000 1500 Z000 2'SOO :B000 E:I:~T WELL' (73] ' " W-18 (41-21-11-1'~-'' ~-'-VERTICAL PROJECTION SNL, 1182' WEL, S~__ 21, TllN, R12E) 1000 1~00 2000 ZSO0 ~000 · 1000 -SUU u u ~u .......... .-; ............... Z ~. ~ ..~..i.J_.L..hL-L.-~-.4-4..i.4--P;-¢.:..+-- .4..4.-+-4----4-~-+-~--~.-t.~--t-t--~-t-?'fT--T-T'T"TI'T"T'T:%L.4..4...~...~ ...... ;....L.,;....L.~,.-L-L.-;...; ....... ~...;..-~..4 ....... ~...; ...... '"!"'"'+'~"t .... _Z.~.~4-4-.;-4...~.-L~-4..4-~.~-+-%-4.--~---+ ...... +-.4.-+-4 ....... +--~.'-~-+'"-t-h'f"?T-?T"T-T'-T'T"T-T't"~-T'T} ~ : ...... :..:.4...;...~...L.4..-L.; ...... ;...~..4,.4 ...... L.;...;-.-~...-,..4.-,~..-~.-4 .... -4.,4-4--4 ...... L--~-4--4-~--~-+-+-~+-+4---~---~--- 4--4..+-~ ....... +'tt"~ ....... t'ff-!"'t't"%T'T"T ..... :'T'T":T"F'T"F'F'Ti;i:7::~ ...... :...i 4...~..~ .L 4.-~...; ....... ~.4..4..4..-..4...~..-~..-F~-4.-4-.~-.* .... -4-+-4-F--+-+.+-~ ...... +-t-t-+.r-t-?-t"t" ~"V-r-r-r"}'"r-F"T"T ....... V-FY', ~J~,, .Z..L,.;%~_4...h:.A..~..4...L..~...4..-~..~..4..4..4 ....... L..4..4..4...~.-+.-~-4-4---.-.+-++-k ..... -4..~.4..4-.b..~.~-~-,.4.-++4-~P--+---~ ..... f-+'+-?t-"t-F't"'V':'"r-FT'TT%~-T-?'.'F ~ ~ ~l ~ ~. ~.._~ ..... ~t~ ~ ~ ~-L..~ ...... L..-~...~...~...%-.;...~..4..-~..-..4..-%'-+-~ ...... ~-'+-+'-+'". ~ ! ~ ~ ~ ~ ~ ~ : : , : ' : : .~.... 4..4-4..4 ...... ~..4-4...~.-,...~.--~-4-*.-.t-~-~.--r'-?~-?"?'~"'t" -?"~-~ ~ T i ~ T ~ : i i ~ ~ i ~ ~ ~ ~ : : :..:....: .... 4,-,~...;,.-~.-. -++- '-4 ..... e-+-.t-?-"---ti''t'-~ '-T'-r'~-t"' ?'T'l"! ...... T' "T"TTM "T-F% ~ .... ;..4...L..i .... ~ .L..L4--..4..~.4..4 ..... ~...:.-.;...;--+-.$.-4.--~-e ...... F+.+-.+ ...... +'"f'-t'i ...... h'!"'T ..... ',--~"':'"r'~", .-4-,.4-4 ...... $...+----~-.-} ..... e-+--~-+'i--t-?'t-t" ?'-r'T'~"T"T-FT-T ...... T'-FT'T'[ ~ ~ ~ ~ _ ~ .L.L. :_.. ~ ~.4_~...&-L..~...;.+4...~.4..4 ...... ~.*.+.-.F.~-4..+.?+--?'+-+'t'-."m"?"'r'.", ~-~ ~ 4-.--4..-;.-4'-~---+-4"4~-~"+-~'+-+ .... +--ht-h' -T--r"r~ ..... ~-'T-'r'T'T'T'T- % T T ~ T4. L4 .... i...L.~-.~ ...L..L.4 4.....4..4.-~...*..+.+..+..4..4..- -.4-.*--4.-?.-~-.+..~-+-e .... -4-! ! +--,---~4---i ~ +-+~ ~ ~.-+-+..~---f- ~ ~-~'-~--t---~---~"~ ..... ?T':' :':':'! ..... i-:'T'T'-'T i ~ '~ '~ : ~ ~ I : ', ~ ~ ~ : ~ ~ ~ ! : ~ ~ ~ ~ ~ ~ ' : : ~.~ ~-~..4-.-.-4 4 4 ~ ..4...'..4.-~.--.~--+.-~.~.~-~-.,t-~-.r ~ ~ i i : : : ! = : : ! : : : : : : . . ..., , ..~.~.4-4-~.-~-.+-~ ..... ~.-.e.....-.?---?..~-!-!-- ..~ ~ , . , : : : : : , : T : ] ~ ~ : ~ : t : -4-++-+-r--.~-+"+'+-"'~"t"t'm'" "'t'~"'T'"t"'l :'T'%T-F' :'"T-~-'T'T ~ ~ ~ '-4- ~- ~-~ ~ -.~..~-4-.;---4..~-4--~]--%.%-%-~.~--.~-.+t+'-' .++.+.+.. h'f-+'i ....... T"~-T'?'!"T'T'T'T- .4-~ 4 4 ..... ;--~--4.-4.---++e~---F'~t'i'-?l 't-~%'~ ....... t--FT'T-"TTTI T ~ T ~ ...... L ~. _ ~ 4.-_~ 4-"-~.:..~.-:.-44 4 4 ¢ ....... F-%-4.-4.....+.+.+-?--'~'-'f'++'1 m"T'~-'t .... ) ~ : i ~ ~ : : ~ t ~ ! ' ' .', ~ .~..~-4--~ ...... ~.-~---e---~-- ---*---~-~"?--~ ~'~-'t'~' ~ ~ ~ ~ ~ ~ ~ ~ ~ : : : : : ~ ~ ~ : : : : ~ ~ : ~ '.---' ..4. - 4...' ..-9-.$ .... ~ ~ ~ ~ ~ : ~; ~ ~ ' i ~ ~ ~ '~ ~ ~ ~ ~ ~ ~ : ..... LL~..~ .... ~4-.L4 ..... &_~..L..~.....4-%.~l-..%+.R.-%t4..q--+-+...--+.+-~-+..~..i-?.t-*-'-~-r"r'r -rT"r"~ -ff-%4--i ..... +.++-~ ..... f't-i"?"'=~'"r: ..... v-r':T'T'-t'~"TX ....... ~..4-4 ~--4-4~;~4~q-~4-~*~-%-~-~-~+~4~+-r~+~-k+~+t~??`.~i~r~.-r~--t..~-T-r.~-~T~T~T~r~ ' : · : : : ~ --~ 4-- 4-4--,--4.-4-.-~--.e ...... e---~.--~-.~ ...... t"?'?"t : ? · · : t :~ ~~ : : ; : : : ' ' ~ 4 ..4-.+,-~4-- ~-+-~----- "~?r-c-"'VT"~ ..... ~ ~ ~ ~ ~ ~ L.L....g.4-~..44~.~-4.-4-~-+--+++-+~-+-f~--t" "T'T'%"i"'~"T'T"~' "T'T'T'T"-~ ~ ~ ~ ~ ~ ~ : ; : ~.-4..4. h:... :~,~,,,~:~::: ~,,, u',,,,~ ~ ~ ~};4~&4_i_..&.L:...LJ-Li.L~ 4-~.4..~..:..+.4..4-4.--,~.~:4--~+' .-4-~4-m..i..4..4-4-= 4-4-4-4--~--4-+.~t--- ~t-i'ti-"??fm',"m-rTT',-T'TT'l ..... T'TT'%%T' ~ ~ ~ ~.~ ~ _,._,._~..4..4-~. --F4.-L.4......4...L.4.-~...~-4...$.~.-F-- ._~.&.4-4-%44..4.-~-...~4--4-¢4--~--4-~--- ~--f'--+'ff'ff-+'+'1-ff"-f-~"~-~"%"%~'] .... T---TT'T'i.T'T'T'T- ].~...~ 'T .l..j_.L.4..4..4......4..4.4..4......4-.L.4..4..-~-4...~.-..~..-~..--4-.-~..++-- -4-~4-~--44-4..4--~.++-P~-.-~+--j-t'-+"h?~"t"'~'~-:'~T:'T'7":-T'7-?T' :::: ::_: .' :: :_~__.L.4..%.4....4.-~.4..4-.-...-~-+..4-+.---+.-~-.+-h-'-~"t'i'?- ::::::::: --:+!-?-:-?:% ::::i: ::%%::: :;::;::;::: :7:::;:::::: ~ i i : ~ : :i , : : -.4. : .~-*..-~-~ + ,-: : t--~ ...... ~.4-4.-~:~-'r'-r-'t-'t"-1-:':~7 : TT : : : : ~ : : : : : : -: J ~:: i i i ) ~::: : :': ': ..i:-i.L.l-~-~..-.4s4-4--:..+ '~-+++: -+:-+:-.-t-t.t-:: ::i-~--::: '--:"i ~: "-T":'T,' : : : 4-.4-4..i:... ..4-~4-~, ..4-.L.4.4-. -4-4.-4.-4-.--e~--~ ....... :-ff-~'t"1"':"~-~" 'T'-FT':-I-:'7-T: ~::]:.:.~L4..-..4-~..~..~- ...~..4..~.....4..~.-:-~-....-+--:-.4-+-- -+"?t't'- -~?~-'~'- ~-+':": .... ::-+':-'-+"f-'J-i-':-:"i"~J ...... j':i:i':-~:'J::j::i:: :: :]:::]::::]::]:]i~~--4----~¢-%-::.-.~.-%'%-:-"-~'+':'?'-~-:':-t" ' : ..... : i i : : : : : : : 1..: :...i..i.:..~..~:.4--,-4--4.--~.-4--%.-L-4.-.L-~-~.. :.4..4..-...%.i.%4-. i 4. ~ ~...: 4--4-4-...-.4-.~--4-4 ' .4-%44--...%..L..:.-~--4-?~?--??..r"~ ..... r'?-:':' t:, :~ ::~: :::: :~ :: ~_~_~' ._~.%.% :-..4-%.4-4-..~-~--k~-.-~..++-+~-+'"""-"~ ~+~"~-'-~"~'-%-%-~-~ : ~ : ~ ~ ~ ~ ' :..:--4..: 4-4 ..... ~.~..4_,.--~.4-4..4-.~+~+--+--~--?.~--~ .... ,'~'T"-?'T'%"? ~-~- ..~-~--:+++-q:~:.-. -+t~t-~-~-t-~ ~-t:: :::::: ::::::::::: :::::::: ::::~.::S.-4:~..~:4..., ..~..~..-F-:-...4.+++-- -~.H.+. -4-~..~ .... :-+.+-~--+-+.-:-+--??'t": ..... :-~":"7-' YT'7-'TW" W~" ~ ::: T_S_.:%~_~__..~..~_~_~ -4..~..~.~ ..... ~.~--:-~---:--&'+-+t'-t-f.-h~--T"~"%~"rT':':-~ .... ~.~.~...~.~+4-,-~.-.:-.~-- -++-+-j ..... j--:~:m' t-t":-:'T'-'T-?"~: -:-:: ~ : : ~: :...:: ~.~ -4-%.%.~-....~..%.~-~ -++4--+..--+-+.4..:.- -:?--:-m" ~-~'-t~-~- ~ I ) : I : i : ) : : : : ~ , : : : : : : : : : : : i ~ : i ii i : : ~. : .: .4...~......~.4..-F--~ ...... *...+..~-4-.-..4.--+.--+-~ ..... i : : ~! i: : i , : ~ i : ...... ~.-~...~..4 ...... i..4-~-~ ...... ~.~..4...~..-+-~-+--~ .... +-++~ ..... ~"T"V'~ ...... VT'-F: ...... :'"'~'":": ~ : ~ : : i :L..~_.~.~-~..-.-4..-~-4..-~...-g..4~-4 .... '::'Z":':"~:Z :: :::i:::% _~s..~...i-: -1.4..~.~.~.4..+~--.-~+-+- -+~q .... ~'~-?~--ti-t~"~"T':T'T-"'t':':~:::::: :...~...i..~4..-...~..F4--~.-~-4..4.-4-4--- "~FFT:"i: ~ : L~..~....._~.g-.i-..~ L.4-4.-~...q...~.4-4.-~--,-4-~--4---~-~--f-'j .... f-ff-'?'r-'-T'T'TT,"T'TTT':"'T'T 7 :_ ..%.l_t i .... L..~..4..~-.-...4...~-..~..4..~-*.4.-4-4 .... '~'~I"~"'i-7":"~-' ": : i i i i ,: ~ i i_~ :: :-~_ :~ 4...-4..4-4-~--,-~-~--~-~ .... ?-i-?'i-'-T'!-%'?'"!"T'T'~ ...... I"i"T?' ~ ] i i : ; / i , i I ~ ~ ~ · ~ ~ '.h.4-~.-~-~..4-~-~-4--4 ...... ,--~-~ ~ ~ ~?-~??~---~-~ t ': : , ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ....... ~...~._~..~... ~.~- ~-~-~---~ ~ .... ~ : : : i ~ : m : : J : t ~ : : ' .~--~-4-- -~.~-4-~---.-~.-~ ..... + .... ~"'~"?'?" '"~"?'-,"'- · . . : "~'"?'?"~"' .~,, ~.~._~__~_~..~_~_-~.-~-.~...~--~-~.-?--.-+?.~.~-??~-~--~-~-r~--~: ~ ~ ~,~ ~ ~ ~ ,.., ...... ~.~=~...m.~.+~--~----t''~%4''~''~--~' 'T~"~ .... , T, ~ ~ i ~. ~ ~ ~ ~ ~ i ~ ,._~~..~-~---~-.-~--'~"~ : ~ , i , ~ ~ .-~-~-4-~-. -4~' -~-~" ~-~q ~ ~ -t~' '~-~ : · - · ~ ~ J i : : ~ ~ ~ : :_ ~ .... · · ~..~.. -~--+-~-.+-- ,.-~-~'" "~'"?'~-?" · ~ ~ i ~ (i ~ ~-+--~- ~hh~: ~ ~ ~ J ti~'-i-T~--~'7-,'!'~'7:T7 : ~ ~ ; ?T'T' ' ~ : : i ~ ~ '4 ~ ~ ~! ~ :--~4 '-4--4 ~ ~ ~ ..... ~..4.~..4.-..-+. -?.4-""N'"?'~ .... : : ~ : ~ ' ' · ' ' ' ~-,-~ - - ~ ~ -:: i" '~-'t''~ ' ' ~ ' : ' ~ ' : ~ 4 ..... ~--4 .......... r-4-.~ .............. ~. ,' ~ ' i , ' . ~ ,, ~ , ~ ....... ~.~-4 ...... 4 .......... "~TT~ '~"~ ~.~.~.4..~...L~ -.~-~- 4~ ~-~ ~ i ~ ~ ~'fm~'~--~TT' 'T'T'~ "TT?T' - ~ L-L..L.....~.-.L.~-~.- -~-4-~'~'- -t'i"i'+- ~ ? FL ]~_~].~-s-~-~-~-~4-~-4-~4- 4~ ~-, ~-~-' -~d-~-~---~":'~'~' ?'=?"~ ....... :'T-FT"."? S ~ ~ i, , ~ ' ' ' ' .............. J~ ' ' '~ ' ' '~ ........... ::::.:::::::i ......... -4-~4-+-.++++- -+%tt""'t-ht't'"'r:-~ :-:': ~: :4:4::.-:S.-4-4- -~.~-4--~----%'i--4--4-' -++.+-+.: ~ ~: ~ ~ i"-?~ ...... t't":"i"'.44..~._:_ .-4-~4..~--~,-+-4--+--?-~-.-?m--t-'-: ....... r'T~"~ ..... ?F:' J : : ! :~ _~L~_~_4..~4-~... _~.~.~4.-~..~..+-++...-+.+.+-~ ...... tT-r~"' ' · _~s~. ~-4-~- ~.-~ .... ~:~ .... ~:~'" ~"~:: ~ ..i_~.s-~..'-4 ~-~s---~.4...i...~...-.~.+.~ ...... ~.-:-:.-+.. -+-'r++'-'4"'~"4"4"-"~"4"'~'4"' ~~::~ :: ~--~-~-=,~1 ~:~ .~--~q---Tq-~m , :~: ' '~ ' ~ :4~ ..... k4..4.4..-~-.~-~-.~-~--:~-.~.-~..t'-~"'!q-t" I~ i ~' ~.4_~_~4_4 ..... ~. ~- ::i+~'-~-' +~!~'--T~ : ~ %~4-4--4..4..:...~.-~---L-~.-4.-%.....4..4..4.-.~-..-4-+.4..4..- :':' :'-:'i :T,i, ;t{t ..... ..~+-4.-P-. t, ,~.-~-*, -4:=:,=,=~ 4--~4-¢---e~-~"~-: · : ; : , : : i ii : : : : : , &~ ~ 4-~..~---~.~-~4'--~-4-1--~- -¢T:'ff ...... .'~ -- ~'~{ ' 1 I t j i, i i i ( i {.. [-, i ~ L{_ :~:~-/.~-.~4-4-4-~4-~"~'~"+'+'+"+'-"+'~'-~"~-' "~-T'?"t"'"'?'~"~-T'' "i"'i"i'--'":"'i"i'i]] {! { { J i, i I i,, ~, i PROJECTION ON VERTICRL PLRNE 91. - 271. SC{ILED IN VERTICRL OF.,P'rI.~ HORIZ 6CALE = 1/500 IN/FT 91. .< m m ~r TELECO 1 Teleco Oilfield Se, .,~s of Alaska Inc. / 61 16 Nielson Way ' " Anchorage, AK 99502 (907) 562-2646 NOve~%ber 28, 1988 JOB #667 STANDARD ALASKA PRODUCTION CO. WELL: W-18 EILEEN WEST END RIG: NABORS 22E At%ached please find a copy of the computer calculated MWD directional surveys for the above mentioned well. Teleco appreciates this opportunity to provide service to Standard Alaska Production Company. Teleco is committed to providing the highest quality MWD service and we would welcome any comments or questions concerning these surveys or any of our other services. Sincerely, · ~..~,,""~'~ Dave Reimer Field Se~ice Supe~isor DR/el Enclosures A Stt~,,IIAT COMPANY TELECO OILFIELD SERVICES JOB 667 SURVEY CALCULATIONS **************************************** Date ,11/13/88 Page 1 ompany: STANDARD ALASKA PRODUCTION ell: W-18 ocation: EILEEN - WEST END ig: NABORS 22E ELECO Job # 667 TAK /A rid Correction: 0.00 degrees agnetic Declination:. 30.80 degrees otal Correction: 30.80 degrees roposed Direction: 98.58 degrees RADIUS.OF CURVATURE CALCULATION **************************************** MEAS DIRECTION TRUE VERTICAL COORDINATES CLOSURE DOG LEG DEPTH INCL AZIMUTH BEARING VERT DEPTH SECTION N/S E/W DIST ANGLE SEVERITY feet deg deg deg/min feet feet feet feet feet deg deg/100' *************************************************************************************************** TIE IN TO CDC SINGLE SHOT 2680.00 0.5 148.8 S 31 12 E 2679.94 14.87 8.56S 4556.00 4897.00 TELECO MWD 3063.00 0.3 93.4 S 86 36 E 3062.93 17.24 3530.00 0.2 292.4 N 67 36 W 3529.92 17.35 4095.00 0.4 219.6 S 39 36 W 4094.91 14.80 9.15S 0.6 181.3 S 01 18 W 0.4 193.2 S 13 12 W 13.75E 16.19 S 58.096E 0.000 9.88S 15.94E 18.76 S 58.206E 0.108 8.48S 16.26E 18.34 S 62.444E 0.106 13.59E 16.38 S 56.034E 0.069 4555.90 13.99 12.86S 12.-20E 17.73 $ 43.508E 0.082 4896.88 14.06 15.81S 11.83E 19.75 S 36.807E 0.066 ?ELECO Job # ' 66'7 TAK /A I~AS DIRECTION DEPTH INCL AZIMUTH BEARING feet dog, deg deg/min TRUE VERTICAL VERT DEPTH SECTION feet feet il/13/88 Page 2 COORDINATES CLOSURE DOG LEG N/S E/W DIST ANGLE SEVERITY feet feet feet deg deg/100 ' 4957.00 1.5 90.6 S 89 24 E 4956.87 14.69 16.49S 12.36E 20.61 S 36.861E 2.724 5148.00 8.4 81.1 5244.00 12.2 80.7 5421.00 16.8 80.0 5516.00 18.3 80.7 5611.00 19.8 81.1 5706.00 21.0 81.8 5800.00 22.7 82.1 5989.00 26.4 83.5 6084.00 28.3 83.9 6462.00 27.7 84.9 6839.00 24.4 87.1 7310.00 23.5 88.8 7875.00 24.1 95.1 8166.00 24.5 97.9 N 81 06 E' 5147.05 30.73 15.30S 28.77E 32.59 S 61.993E 3.626 N 80 42 E 5241.48 47.09 12.59S 45.72E 47.42 S 74.604E 3.959 NEW PROPOSAL: S82.88E N 80 00 E 5412.80 89.17 5.16S 89.40E 89.55 S 86.694E 2.601 TELECO MWD N 80 42 E 5503.37 116.37 0.36S 117.64E 117.64 S 89.823E 1.595 N 81 06 E 5593.17 145.92 4.54N 148.25E 148.32 N 88.246E 1.585 N 81 48 E 5682.21 177.56 9.46N 181.00E 181.25 N 87.007E 1.289 N 82 06 E 5769.45 211.08 14.36N 215.64E 216.12 N 86.190E 1.812 N 83 30 E 5941.34 286.63 24.20N 293.53E 294.53 N 85.287E 1.982 N 83 54 E 6025.71 328.81 28.99N 336.91E 338.15 N 85.082E 2.009 N 84 54 E 6359.47 500.86 46.30N 513..52E 515.61 N 84.847E 0.202 N 87 06 E 6698.12 662.42 57.85N 678.65E 681.11 N 85.127E 0.912 N 88 48 E 7128.56 850.33 64.69N 869.71E 872.12 N 85. 746E 0 · 241 S 84 54 E 7645.51 1076.70 56.93N S 82 06 E 7910.73 1196.36 43.38N 1097.48E 1098.95 1216.45E 1217.22 N 87.030E 0.462 ~ 87.958E 0.419 ~ELECO Job # ~ 667 TAK /A' I~AS DIRECTION TRUE VERTICAL DEPTH INCL AZIMUTH BEARING VERT DEPTH SECTION il/13/88 COORDINATES N/S E/W 'Page 3 CLOSURE DOG LEG DIST ANGLE SEVERITY feet deg deg deg/min feet feet feet feet feet deg deg/100 ' 8637.00 8958.00 21.5 100.1 S 79 54 E 8344.24 1380.36 18.5 103.6 S 76 24 E' 8645.85 1489.94 14.59N 1398.18E 1398.26 N 89.402E 0.662 7.94S 1505.60E 1505.62 S 89.698E 1.006 400 40O 1200 60O 2000 2~oo 2800 9200 TELE£O 0 i i F i e i d ?LAN ViEW S~rv i cms 0 400 80G i 200 1600 2000 2400 EAST r' :.,AL. PRC3EET'iON 0 2060 40GO ~ Sooo 1000 2.000 3000 4000 5000 6000 ~' ..... ~"-r'-"~ .... ? .......... ,~'-'~ ..... %-'. .... '~ ...... ?- , .... : ........ '1=-. .... ?' 'T"-, ..... ~ ..... ?" ~ .... ! ..... T .........~' '/ "T 'F , 6000 J,,... > 7000 i-- 8000 · , l. ' ~ i :' ! i~ ~ ' I :, ~ ~ ~ i ~j ~ _ ' ' ' ~" ~ .... ~ .... t '~ 4-,- ~ ...... ~" ' : ' ' ' ' ' ' ' '-- , I i I j i !--T- _¢.&.L.&__.i.X_..L4X ,, , t ~ I .j ~ t ~ ..... ___ ..... ] i kl! il ~ ! i ! ~ ; I I,..L.i ~ ill L~ , i 1 :/ ~ ~ 1 I 1 j I , ~ ! I ~ t ii : L- .~_~.,~.J.._~.=,.~ ....... ~_L~ ........ _ ]._I ii ~ I,, ,!t,, ! ~ , , , , STANDARD ALASKA PRODUCTION CO. PAD W (44-15-11-12) W 18 Controlled Drilling Consultants, Inc. ES HENDERSON 3334552 CONTROLLED DRILLING CONSULTANTS, INC. P.O. Box 190560 Anchorage, Alaska 99519-0560 (907) 333-1552 November 23,1988 Mr. Brian Rose Standard Alaska Production Company Pouch 196612 Anchorage, AK. 99519-6612 RE: Magnetic Single Shot Survey Job No. A-1188-011 Well: W-18 (44-15-11-12) Prudhoe Bay Field North Slope, Alaska Date of Survey 11-11-88 to 11-23-88 Dear Mr. Rose' Please find enclosed the "Original" and six (6) Copies of our Magnetic Single Shot Survey on the above well. The method of Calculating this survey was Radius of Curvature. The depth of the survey was O' to 8958'. Thank you for giving us this opportunity to be of service. Yours very truly, Controlled Drilling Consultants, Inc. Terr~ Henderson Directional Supervisor HORIZONTAL VIEW STANDARD ALASKA PRODUCTION CO. WELL W~I8 (44-15-11-12) RADIUS OF CURVATURE MAGNETIC SINGLE SHOT SCALE: I"' I000' NOVEMBER $0~ 1988 0 0 0 o8 ~~ooo 0 ~ ~ ~ 0 0 --I ~~ TVD :8,705' o CLOSURE. TMD = 9,020' ~o S89°27'E 152:.'.'5 ' ALL DEPTHS SHOWN ARE TVD HORIZONTAL VIEW STANDARD ALASKA PRODUCTION CO. NVELL ~/-18 (44-15-11-12) RADIUS OF CURVATURE MAGNETIC SINGLE SHOT S~LE: I"= I000'. NOVEMBER ~ 19B8 , ( ( f STANDARD ALASKA PRODUCTION COMPANY JOB NO A-t ¡e8-Q1i MAGNETIC SINGLE SHOT SURVE~ WELL ij-18 _u.R.AÐI..US-...OF...-CUR-VA.¡.URE. METHOD OF COMPUTATION KB ELEV 82.38 FT I -.ENG~H£ER.-M£Ni'1£Rs.o.N SURVEY DRTE 1 1/11/88 -.cOMP.UT.ED- .EOJL CD..c .S\' OCEAHïECH PROPOSED Ü ¡ R 992, 9~:E . ...... - ...... .. . -- . ... . - . -- ... -.. .. -........ -... ... --.. . .. . ... .....~ .... .. .. . .- .. . . RECORD OF SURVEY ---.-". .. ",. ----.. .------ - - .... --... .. .., ....... .-.-.- - '---'- .... ... . --'.. ... ........-..-..-..........TRUE VfJI~..t.Ej;~ .._."EAS~. .D~F-T YERTICAL ~UB DRI~T TOTAL COORDINA'fES I ~ LOS U R ~i ~~ ;~~'~7~~ T~ ,~~;;.:.9i-i ...-DEPTH ..AHCL£-........ DEPTH ~EA DIRt.C t I;:rTÄNCE ANG!...I... rl.':.~f . '.,uF ~ (.. ..~, 'rH.=! -'-....-... -.... ....._..D.-__J!L..... . .. DEG I ~) ¡"~ g --...... "... ..... -u_-............-.. -.-..-.....--------..-...---.-..,...... --... .. "..,. . --AS..sUJt1I!O Vt;'RllCAL.._...TD.. 0 F.T I --~--"""'- ...~..,"~- ...~,.._..~,-",~....._-----,.....,_.,.....,. '" , , ' " ".. , . .. -...--..-..--....O..-.--.L-lL--.-.---..........-a.OO -82.38 N ,OOE .00 S ,00 lð ,00 S.9Q f.i ;) J.d .j)!)!) I)!) --A..Q3-.---Ð---15- 403--_0.0..... ..320.62 S 7. 20E r 87 S t 11. . E .188 S 7 12 t).E .' rJ62 .. 1.24:.. --.-.9A6- ð 30 .-.9-4.5......9.9 863.61 S7S.S0E 3.31 S 2.38 E 4.0.7 S 35 44 43 E ,.l~.4_6 2.77 -.-...1-4-8.1..-..--.1J-...-3..o.--....-14.8.6......97 ..1..404.59 825.20£ 6.11 S 5.97 E . e .54 9 44 1'~ 34..E ... t aG3 6 I 6.S. ~_.2..OA'Z-.D_...1.5-._--2..Q.4A......9_5-.....- ..1..9.64....51 .H60 I 80E 7 I 11 S .9. 08. E 11 1.53..S .51. . 5t~ :31 . E. . .. .. : Q"I S ... .. ~!" S.~ ---...26..8.0-......-...-.0-.3..0-.-.-.-26.1...9.....9.4.. 2597.56 531 1.2 OE S . 06 S 1.2 I 70 E 15. 0.4 S 57 35. 14.. E " . I !)40. . ..1 :}., .60 -3..116.3.....---0.--1.8--3.0..62.-1.9..3. 2980, 55 S86 , 60E 9 , 39 S 1 4 . 90 E 171 6.1 S.. .5.7. 46.. 43 .. E 05 ~~ . . . 1 5.. 95.. ......-.-.35.3.0. ..... ..-0- .~.l2.._.--.3-529., 93 3447. 55 H67 16 Old . a. 00 S 15 122 E 1 l' . 1.9 S 62 1 G 54 E , o;~ 1 1. 6 :.69 ~.4.D.9.5-....._...-O-..-2Ã---4-.09.4.......92. . 4012.54 939.6 OW 8.6'7 S 12.54 £ 15.24 S 55 ~2 t 9 . E . , (}35 13 , :'5.2. n ~60 4!5.51L-.9.0. .4..4.13.52 S t, 3 OW 12 t 37 S t 1 . 16 E 1.6..66 .9 4.2 :] 59. ..E.. ... ... t. Jj4.~j .... .1..2 J.61.... .4.8-9.2._._.0 ~4 4.8.9.6...0-8.9.....481.4.".51 .S13,201d 15,31 S 10.78 E 18.13.S .35. 9..32 E. . .1.05.9.. ............1.2..,_( .--.-.4.9.!52-- 1 30 A.9!1\6-+..8S.............4..9.1.4.5.0.. se9..40E 15.99 S .11-.32 E . . .19,59 S 35 17 20 .E' .1.83('. . .1.3.1':';. 5..1-4..8--. e 24 .-..5..L4.1........0.5.. ..5.064.67 ;;81.10£ 14.90 S 21,7.3. E 31...4.3. S .6.1..54. 1.t..E ...3.1.6..1.4....... .. . .2.9...3.5- --5.2-4A----t2......1.2-..5..2Ã.1..~.4.9-." .5159. t 1 NSO, 10£ t 2.09 S 44.67 E 46 I 28.S 74 51 28 E ... 3,9.58 .............4.5 18..3. -....54.2J-..-.1.6-..A8..-.-5...4.12~80 5330.42 HSO.OOE 4.66 9 98.35 E 8S.49. S 86 58 44 E. .2...599 .8,19..25 --.S5.1.b---l8-1.L--55-n3-".38-.. ....5421'. no Neo. 90E .09. N.. 1..1.6..6.0. E .. 116 L.60... ~i..S.9...5? 2.1.:...E ...... .........1.1_.5..e2..... .......... ."!.J5..._6..9... .5.6.ti-19 49 55-9.3....\---1...1-.... 5.5J 0..-19.. NS.1. 1. OE 4 . 94 ..H t. 47 . 23 .E J 4.?, :3 t... 1'4 ..8.8 .. 4 41... E.... .... ....1 . .5.'7..9. . .... .-. ..1.,45 . .4.a .. --5.7-4-6..-...2..1.--..--0-.-.--5.6.8.2....2.1 5599,9.3 HS 1 , S OE 9, 96 Ii 179197 E t 8.0.24 N 86 51 46 E 1 2.67 '117: 1.36 5900 22 42 5769.....46...... ...5.68? os HS2. 1 OE 14.76. N. 2.14.6.1..£. 2.1.5..1.2 H 86 .. 3 .53. ..E... . t 1....90.9. ........._...2..1 1. 1.1..2 . -_.-.sa.9.4--24---24--.-5.a.5S~.'2... 5773.24 NS2, 80E 19. ? 0 N 251 ..84 E .2521 b..1. H .9S.. .3.. i ...4.0 E... 1. S..13 .... ... .. .. '24.:? .....46... --....59.8.9---U.--2-4--.--5-94l..44 .. 5859. 06 NBJ . 50E 24. 56 N 292.30 E 293.33 H 85 11 5 Î E. . 2. 11 0 ..' .287 rOO. -_.~ -_._~.._,._...,... , ' " , , .', ¡--..-... "."'---''''---'--'''-''''--- -...... ...... .. ..... . ... '''''''''' .. ._.... .... ...... .......... .. .. ...... . ... .. .....-.... ... . ...-..."" r~===~'~~:.::~'~.:~:,~:~==--=..~.~=:~~'~~~~"'-~'.-~:."-"---........- .. . .. .. . ... ... .... L.....--. -. --.--..--.--..-----...--.-'-".." . - . .... ... ........... ...... ..... .... ..' .... -....-. . ... ......-... .. - - - - - - - - - - - - """""",,-""-,":....- - -,- ~ -II"::"'" -.- -'- - ~,-'- -----. - - ----':- - -,~ - -'- - - ---- - -- SOBIO WELL W'-18 SINGLE SHOT SUR'JE\' ..'08 NO ¡'~-1 f 38-011 COMF'UTE.R'-' 2'}, t.;.)\': 88 KS ELEV 8~,38 FT . '. . .. ..... - ~.. . ... - "~"-' .".. .'----~ ----- -.-- .... -",., .-. ... .. - -- - --.", . . .. ..... "-'.. . - ..... RECORD OF SURVE"( ,_u_",. .. . .... -. -. -. .---." . "--. . ., .. "'......-.-- --..... - -- . .-.-..-..- _.. --... T-RUE l)O~ tEG ..-M£AS-- -D.iU.£I.-..!~.E.RT..ICÅ.L SUB. DR.IFT TOTRL COORDINATES C L fj SUR E S SE'i:::RI ¡").I 8ECï :;>::f'~ --DEP-TH... ANGLE...... . .DEPTH SEA D I REC D I STANCE ANGL£ DEG/l Û IjFT (~I S TA~:¡GE - ... -.. .....D-mJ1..- . DEG, i) \"1 8 ='.-='6.i.e.4.'~_2B---1'a'.~'..~-6.025~a.l 5943.43 H83.90E 29,35 N 335.68 E 336,96 N a;; Ü 1.3 t. ~2.082 32'3,( '--. £46.2.-.21.._..4.2..---- 6.3.5.9....57 6277. 19 t-l84. 90E 46 166 N 512 I 29 E 51.4 ~ 41 H .e4 4:;' ,43 E ,1.69 502,5::) ...._.683.9..2.4 ..2.4........6..69S~22 6615.84 H87.10E 58.21 N 677.41 E 679,91 N 95 :3 19 E ,881 664,':17 --Z.3.-Lo...--2.3-3..0-_L.t2.tL..6A... .70.46,29 Nes ~ aOE 65 ~ 05 N 869.48 E 970191 N .85 42 59 E.. 2.00 . .. 853 ,"(2. ._-J.at!.5..--2.L--6....._1'-6A.5-~...61. 7.563,23 SS4 I 1 OE 55. ? 1 N 1 096 I 14 E 1 097 , .56 N. 6'7 S 26. E. ' ~~5.... 1 (i.S ~ . '?'~. --.....8..1..6.6...2.4......3..0-._.....1.-9.1...0...8..3. 7.828.45 SS2.10E 41.32 N 1215.02 E 1215.72 H. .sa 3. e E ,181 120.(1.53 -'.- 86.3..?--".21._....3..G--S3.4.4 .~. 34.. 9261.96 979.90£ 12. 54 PI 1396 , 76 £ 1396. S 1 H 89 29 eE, ~41) t ~¡a~L 43. ---.8.958..-..18 =30 -",4-5-....95 ..9.56.3.57 876. 40E 10.00 9 1504..18 E 1504..21 S 99 37 S E. e 941 14'13 I ß32 -"-''''-~ ""."- ._-------_.~.._... ~-- .. --I.HE... -E..QLLO.w~.IiG.....--1S. ...E.XTR.APOLÄTED TO TD ---- ---.---....-.........,..,. "' . . . .... -, ... ..... .... ,.,.... ....... ...... '" ._..9_.0.2-0._..-.1.1t-3ß.__.._...8l..D.4....24. 8.622.~.36' 876 I 40£ 14.63 S 152.3. .30 E 1523.131 S 99 26 59 £ . UO~) .. 151.3.. :36 "-_..........,-- .-...........--.- --.....--....-...--.-........... ..--. ........ . ... ....... .--BOT.T...o.M_._HO.l..£__C.L.OSURE. 1523.37 FEE'r AT S 99 26 59 E .. . . ... .. ....... ... ... .. ... ... --"--",,.--,,----., ----------...-..... ... ... ~.. . . -...-..-.- .....-....... -.. . .. .. .. "" .. ..... .. .... .. . ..... ......... . ... =~~~:~~.~~:=.~~-=~=-=~.:=-~~~~:'.'........ '...:..'... . ., . .... .. .. ..... .. . ( -,.,---.-.-.--,--.,----"."-,.,,,- ......--..... ...... .... --'---'-----'-- _....__._.~..._._. ""'" . -...-............. ""_._""-"------'-_.'--"--""'~' .. . ... ..... ... .. ......... ...-.... .. .. -. . . -.--.-.--- ...---------...-.-.-....-.. _. ...- ..... . ... . ... ..... .... ... ...... ... ... . .... ... . .... . ... .. ... .. ..... .m... .... ... ... .... ."-"""-" ..-... ."""'" . .. .. . ... '''''''.'''' . ... .. ....... "..m ...... -'-'--'''-''''-'''''''''''......-.........-..--..----..-....-..-....-...,..... ....... .. ---..- . ................. ... ..... .. .. .. - ...,. .. .. -----.--.--------..--. ..........-.... . . . ..... ....... .... . ... -.-.-...--.....--. .....--.-....- .-. ..-...................... .. -...-.........-... ........ .. .... "-..'-""-'''''---------'-'''-'''--''''''' ....... . ... . . .. .... --... - ..-.......................... ........ .. .. . .. ... ... ... .. ... "" .,., ...- ---..--.....--.. -- ................ """ .. . ... . .. .. .... ........ ... ..... ..... .....-. ......-.... ...... .... . . ~... -........--......- ..............................---..-.....--.--....--..".................... ..... .... .. .. =~'."~~~:::"~'.'~~~~=~=~-_..-f --"=~~'''~':'~~'''.':' ',,":' ". '. ( ... . ( . .'" .. :. '-, . .--".. ..:..--,.- ."",--,. ........-- -.......- '~'-........ . ...... . . .... .' ""... . .. . "," ~.. . . .. . . '... . ,. . . "", . ..., ... . ...' .. I . ," .. ... ~. -. i. t i. SOHIO WELL W-19 SINGLE SHOT SURVEY JQB NO A-1189-011 COMPUTER- ~9 NùV 88 KB ELEV 82.38 FT. . M.EASURED DE.PTH AND OTHER DATA FOR EVERì~ E'.jEN 1')0 FEET OF SUB SEA DEPTH I II .. .. _.. .. . ..~ . .. _.. - .-_.~. n. . .. '"'''' ....... .--....-.-..-.- ..- - .. .. TRUE MEASURED VERTICAL SUB MD-TVD VERTICAL -.. .." . .. . J)EP .rH.. .. . DE P T H SEA D IFF ERE H C E COR R E C TIC N TOT ALe 00 R D I HAT Ë S . .... .. .. .. .n,... -. -." '''' ._..0_- ....... 0 I -82 0 0 ,00 S . no lJ "'-" .........1.8..2.... -... . 1 82 I 1 00 0 0 I 04 N . ~ 8 E ~... ..--...-...-_-_..-...28.2 .. 282 I ;2 00 0 0 ~ 22 S : ::;:~~:: E ."" ..... 38.2.... 382 I 300 0 0 176 S .22 E ~.. . ... .... . . -_..4.8.2..... -. .. 4. S 2 I 4 0 0 0 I) 1 I 2 3 S I 'j 9 E ( :--.-. .. .. .. ." 5.8.2...._.... . ... 582 I 500 0 0 1 . 73 S . '41 ¡:: ! 682.-. . 682. 600 0 0 2,23 $ ,76 E ~..__.....__...._....... '--' -..Lt1L._-_.-..... ...... -.... .782 I 700 0 8) 2170 S 1 .26 E ~- -"."" -. ........as.2-_---. .. ... .. .882 . SO 0 0 0 3 I 1 O. S 1 .' ~ i E L__.............. - ...................9..9..2..-_......... .... .... . .982. 900 0 0 :3 . 38 S :2 .6'3 E' It-"'" . ..LO.8.2....._n........ . t 082 r 1000 0 0 3.6'7 S :3 15; E -'-""""" -. .....ti22-_.___..-...... .. 1.182 I 11 00 0 0 4 . .1 0 S 4 ,27 E _...- ......_...1..2.8.2_.__--.-..... .'28~, 1200 (I 0 4,61$ S 4.94 E i...:--...--.-.................... ..l3..82.___.-..... .... ...... . . J..3 S 2 . i :.3 0 (I 0 0 5 , 32 S ;; ..5 0 . E . ....' . -........." . L__.... 1482 ..---.-.. ..... .1..~le.2 I 1400 0 0 6 I 07 S 5 ,~5 E ~_......_. ..............._..1.5.82---__..-...-............ . 1..582. . 1500 I) (t .6 ; 77 S 6 ',' .4 ü E 1--.--..... .............._..1.6..8..2.._._.........-: ....... . ),6.82 I 1600 0 0 7 . 26 S 6. ",8 E ~_.......... .._._ll_82-_....... ..... t?8øL 1700 0 0 7;50 S 7,J$3 E t--...--........-_.._.ta...82__._.............. .. 1882, t SO 0 0 1) 7' , 51 S. a. 25 E r--."'''''''' .-.-.-...19..82---.-...-... -_.....__1.9..82_£.. ...1 900 0 0 7 I 32 S S , SO E _..._..._...._............._.2..oa~ ....._.._........20..8.2A. 2000 0 0 7..03.S 9,~.2 E.. ........ "'''''''''''''''''''''''''''.''''.'''' { "..---.--.-. 21 92 ----...-....._2...1...8.2 ,.. 2. 0 0 0 0 6 I a 9 S 9 I .69 E ..-..,,-- _--2.2.8.2._----- -.- . - .. ...2.2.8 2 ... 22 0 0 0 0 . 6 .d3 4. S j 0 I ~.5 E -.... :.. ..... . _2.3.8.2-..--------...-..... . .2.382. 2300 0 0 6,92 S 1 0 187 E --..'" -....- .........2.4-82. ---....-........" 2.492 A 2400 0 0 7 1 15 S .11 . 5 i E ---.."'-" ....-._2582-----..-..-...-.............. ...2.5.82 I.. 2500 0 0 '7 . 5.. S. 1 :2 t 1." E . . ...... ...- ...." ..--. .. ...... . -_..._.._.-268~ --...- .ë16.82.. 2600 0 0 a. 08 S 12 ,71 ~ .... .... ""'" r---- ------2.ZB2:..-____--2782. 2100 0 0 8.72.S 13..~3 Ii: ---_-2BJU--__..._-_.._-_._..........2.S.8.2.. . .2.800 0 0 9.,15 $.. :I J I 9.2 E . ..... . ...... . . .m....--.... .-.-...- ..2.9_82--.-..- -..-..-.-..... .. 29..82.. 290(1 0 0 9..37 S 1 4 1.43 E. -.... -". ..'... ..._JJl82..--._.......... .-... J 082 J 300 (I 0 0 9 I 40 S , 1 5 t 0 () E ... .. . -..... ............. ..........3_182..---.......- ....-'-'''.'''' 3_t 8.2.. .31 0 Q . 0 0 9 r 63 S 1 5. , 44". e: t-----.....__.___...32a:2 ................._....._....3.2.82, 3200 . 0 (t 11)4.04 S .15,~4..E . . ....... .. . . D.B2-----..-..--.._._-.33..S.2. .3300 0 0 1 (1 r. 47 S. t!:S . SJ€, E " 1--.... ....-..-..... ......- --.3.4.8.2.-..-..... ..... .. . .. ...3.482 t . 340 (J 0 0 1 O. J 76. S.. l5.. 2.5 . E 1........-..... . ....<...-....---.-...-.....-.-.... ...-- ... . .._--------------"----.~___--'__.___----'----'------'-'-- SOHIO WELL W-18 SINGLE SHOT SURVEY JOB NO A-1188-01i CDMPUTER- 29 fiOV &8 KB ELEV 82 38 FT, ...-I'1.EASUR£D--)£~.l.H .AND OTHER DATA FOR EVER~~ E\iEN 100 FEc:r OF SUB SEA L)EPTH. - þ~... .. ..- . -.-. ----.-..--".. . '--.' -.----. -. "... ---. .... -- . '" -.. .. '"''-''' T RUE . -. MEAS.UR.ED... VERT IC~L SUB MD-TVD \}ERT I CAL "-"-.. ~.£e.:rH....- -. DEPTH SEA DIFFERENCE CORRECT ION TOTRL COORD INATES .-- . ......- .._".n. ",_.. . '- . - ..- ..-. . n . ...- ---. -----J!18~ -... -...' .. .3582. 3500 0 0 7 . 93 S 1 5 . û~ E .-.. .... . ---.....3..6.8.2.....- .....-.. .. ..-.... .... 3692 I 3 EO 0 Û 0 7 I S 7 S i.4 , t;, 3 E "-"-. . ... ...3.7_8.2-_- ..-. ... .3.182. 3700 Ú 0 "{ I aa s 14. i 6 E .. .. .. .. - ...3.aa2-. ....... .. 3 a a 2 . 3 S 0 0 0 0 S , 0 1 S 1 J I 65 E -..... ... ..... .....-3..9.82--... .-.- ... . 3982. J'~ 0 0 COg, 25 S 1 :3 . i;2 E ( -... -....... .. ---...4..0.8..2...--..- .-...... .. .. 4082 . 40.00 0 0 S , 61 S ~ 2 , 60 E .-..... ." ..§J-8.2...-.... ....... ." . 4 t 82 . 41 00 0 0 9 . 1 8 S i 2 . 1 6 E _....... 4~g~ __.._...4282.. 4200 0 0 9,99 S 11 ,'('13 E ,.-.-.-....-...-... ._-4382-..-----........-.-... .....43.8.2. 4300 0 0 1 () . 71 S 1 i .47' E r--'-"'''' ..........-."82-....--..-....-..- . ..4482. 4400 0 0 11....63 S . ...11 .25 E -----.._......--.-.45e~ _.__u.--' .4582, 4500 0 0 12.64 S 11,15. E ......--..........--4A82---...--..---..........46.82.. 4600 0 0 13,6.1 S 1,.09 E .... .. ..... .. _-..n.__..-..., -42.8.2-.-...--..-. ...... .4782. 4'700 0 0 1 4 . .46 S 1 Ù t 97 E --................-.........--4.8.82...-.--...--.-- ....-.-.. -.. ..488.2... . 4800 0 0 1 5 .21 S to., e 1- e:. . .. ... ..---.-A9.8.3-_..--A.9.8_2.a . ..... 4.9.0Q 0 0 t 5..99 .S . 12 I 'I~' E ...., ... . ...-.......-........ .........-.....-5..0S3 .-..-.- ..-........ -.. .5.092... 5000 Q 0 1 5 . 6 J S \ 1.9 . 59 E " .. .................--...-.... ~19" ..---.-......... ...5.1..82. 5tOO 1 1 13...9.2..S. J3..J3 E .... ......... ......... .. ............-.--. ...... ...... ...-. -".. .. - -...52.8.6..-_-..---.- - .5.282 « 52,00:] 2 1 0 I 59 S. 53 . a.f,) E --..........-....----.-5-3.8.9 --...-.....-.....539.2. 5300 6 :3 6.20 S 19.55 E ----- . 5494 --.-....- .54.8-.2. . . .5400 .. 11 5 . .1 r. 0.1 S 1. 09-.. 82 E .. .. .. . . ....... ...." .-.-......- !)h 00 _..... ..-. .....55.8.2 .. .5500 1 7 6 .. . 34 . H 143 ~ 4;2 . E .. .. ........ .:. ... ( ..----...---.--- !\?O~ .--5.6.82... .. 5600 23. , 9.81 H .f eo. 1)4 E . .. .:.. . ....-...-..--...--5.Si.4----...-.............578.2. 5100 31 S 15..5.t . N 220.,.. 00 E. ... ... .... ._. . ---....-.-.-.......-..5.9.23---.......-..5.88.2. .5800 41 10 2t~22 N .264,.Oê, E ... ..... ......-.......-...u.-.....-.-..-...- . .. .. ..-.....6..C13.5.--...-. ., .5982. 5900 52 11 26,97 N J 12 I 90 E -----.-.-.... ...... -....-....-6 t 48 ---.-..............-......-.6..0.8.2.... . '0.00. ..65. 13 .. 32.. 53 .N ... ...3.6.51.'.0 ..E. '... .......... ...... .., .. . ......... ....". ... ---. 6~.ç.~ ..__...........6.1..8.2... 61 00 79 1 4 .37...9..t. H. . ...41 9..~.. 0.4. E........... ..,...... ..... .... .... ..... -. .. . .... ....... ..... ............. .--.....-... -.-...-.--.....A32.5.-.-......-...-.......... ....., ..628.2 f . 6200 92 .13 42.97 H 4 71 ~ 9 i E _...0'_.-'.""''''----' - 6488---.----.-.......6.3.8-2... --- -.. ...63.00 1 05 .1 3 47. 71 . t4 . 524. t 6. E .'--.-""'_''''_h_h-...6A.O-O--...---..-.... .... .6.482. . 6400 117 12 51 «81 H 5.7.4...92. .E. .. ....... .... .. -- ..... ........ ..... . --.. --.-........----Al.t-l---..n... ...- ..65.82 II 6500 122 11 5511 a N G23..6.ú E. .. . .. "" .......-..... .. . . . .... . --...... ....... -..-..68.2.2--.-.-..-----....--......... .6.682.. . ..6600 139 11 51.85 H... .6'70.21 E.. .... .-......-..---.-6931 --.--.......-..6Zi2... .6100. 1.49. 9 .. 60.0..2. H... ....7.1..5.:!9...E...._......... ... . ........ ..... .. ....................-.. ----.. ?O41 - .---6882...... .6800. 158 10 61..S1. N ..760: 12 E.. ...... .. ..... ! ..--..-.-.---.-----.1-..1.5.0..----..-...-...........-6982'1 6900 t 67 9 63 , 40 N S 04 ,43 e : u.......-.....-.-..----{ ."'--."--'--''''''''-'-'''''''''' . ( . . - . .. ( '1" _..""'"--\,-.---,---. .~. . ~ '- "- . ,. . . ~.' ." ¡ . I'. . I. .". . . - . . - .. ., .... I' t l ~ SOHIO WELL W-18 SINGLE SHOT SURVEY JOB NO A-119S-0t1 COMPUTER- 29 NOV 88 KB EL~V g~.38 FT, . KEASURED-D£~TH AND OTHER DATA FOR EVERY EVEN 100 FEET OF SUB SEA DEPTH, . - - . . . . ... ....... ~. .. . ._~ '--. .. .. . . "'''' .. -...-------- ----.-......... . TRUE MEASURED. VERTICAL SUB ND-TVD VERTIÇAL ".. .. ..D_EP_T.H..._... DEPTH SEA DIFFERENCE CORRECTION TOTAL. COORf)INATES ~ . " "' - - .. .. - -' ". ~ -.. . .. . ..... .-.. . . . 7.2.6..~_.--. - .7 09..2 I 7 0 " 0 1 77 1 0 64 , 6 0 N 84$ , J °ì E .". "" .......{..3..6.9_........ . 7182. 7100 186 9 65.39 H 891,$';:' E --_._....._....1.4..£.8_.. . 7282. 7200 195 9 65.22 H ',35.60 E. '''' ..... ...7..587 7382. 7300 204 9 64.00 N 9'{'9. 55 E 1. .. 9~ L 7 4 a 2 -:7 4 0 0 2 1 "'!I 9 -: 1 7 ,., , " 1 -1'-"" ";' ,) -, ( 1" -"" - .. .- . - . .. ..6.. ~_.. . -. . . . .. l..s f,;o . ~ ii . U,:£: 0,), I,; t:. i.-...--.. -_....... .... ..1.8..0.6.... ..- ...... "'" 7582 I . 7500 223 1 0 sa . 37 N 1 068 I o=~ E 1.-.. 79..15. .... '. 7682. 7600 232 9 53 I 9.7 M 11 '2 I 54 E 1-'-----. ..... ..... A 025 .---..-.--..-......-.-....7.7.82. 7700 242 1 0 48 , 84 M 115.7 . 23 E ~_._......._. .........--.8.1-3.5-....-...-..... ..-. ...... 7.9.82. 7800 252 1 0 . 43« 07 H 12 v< ~.2 O. . E. . ~,........... ..._...82.44. -.-....."......... 7992. 7'~OD 2'62 10 36,19 N 1246.93 E 1'-" .. .... B-35.4...__..-. -. . .. . 8 0.82 I e 0 0 0 27 t 9 3 0 . :3 O. N t 2.9 0 . 26 E 1'---'.'"'''' ... ...... B4~:2 -...-. ... .8...1.8_2. 81 00 279 S 23 . 64 N 1332 I 1 0 E .. --. 1--.... .....-.... ..-..--852.0.-._._........----..-..-..--.. _8.2.8..2. . 32.00 287 8 1 6 ,82 H 1372 ,4-7 E Ci_.........-......-.-...- ....B'-1..B..___..-........................ ..8.382, 8300 295 .8 9.ee.N. 1411.3~ E. . ........ ....... ........ "'''' ..-.....-.-8.1..8..5__.._.....--........._.S.482. .8400 302 ? 2 161 N 1448 . 29 E I . . ..... ... .... ... ... .. ... ... .... ...... . r'---''''''--''-''''-''.''.''''''Sti.L-....-........... ...........85.92. 8500 30e 6 5,00 .S. .1493.1.1 E f..._......... .... .........S..~.6_.._._..,........._... .... . .8682 I 9600 314 6 12. S 7 S 1516 . 1)2 E l...... . .. ...9.:O.2J1.. ...-.... 8105 , 8622 31 5 1 14 .63 S 1 ~2 3 '. ~ I) E I -~:.~..~:_.' ...::.~~..:.:_~~.=~~-===~_..... -... ............. .. .... . .. .. . '." . '.' .' . . -~~~-~~==~==~~~=~~=:~~:~..~'_.~.~:'~.:.' . .'..' .. .'.... . .. .. ....... ... -. ... . .. - ....... .. ..... -. ..-............ . ....... ..... ..... -( ,. ",-"---,~""",,,,,_.,-,- -'-----'...----.-...-.,...,. . .......... .... " ........ '.'.'-""'''''''''"----.---"-,--,-,,,,,,,,,., . .. .--.. . . ... ...... ... ...-_... --...-.... -..--.. . ---"'''''-''~ -'-"-""--~"._------",-"---~-"",-",,, ..-. ...... .... ... .. ... . .. .. .... n "., . _.n... ."._....n. ... . n. . . . '.'."'" .. -- ---- ..-.....-..-...... . . .. . . .. .... ... . .... n"', .... .. ... .-... .....- ..... -"'''-'''''' ---'.''''''''-''''-'".-"--------",-"",,,,,,-,,, .. . . ., .. . -'-.."'''''.''--'''-'''' --.--..-............ ..... ... ..n. ..... ... ...... ... .. '-'''-''-~.''._-''--_.''''-'-'''----''.''_. . .... .. . "" . ....... -. .m..... ."'-. ."""".-.-------,,-,,--.-,- --.. u-. ..... . . . .... ..... .... ..-.-..-.-...... ..-..-.......-....----------.-..---..-. _.._n .. _. .. '" . . "'." . =-=-~=~-==:=-_:_----:- .r"", ' . ..... ... . .. . ... .. ... -''''~'-'''-- ..---. -.... '''''''-''----.--'''''-''' ... ... .. ..'--------------'-~._--~~--_._--_._------------------ SOHIO WELL W-1S SINGLE SHOT SURVEY JOB HO A-1~ga-011 COMPUTER- 29 ~OV 88 KB ELE~} a~~, '38 ~-:'[: ",.. -. .... - . .- '" . .... '.'" ~ -...-.--..-. ---." . . . ._...I.NT£R.P-Ot °TEf")....VALUES. FOR EVEN 1000 FE:ET OF NEASL!RELi :~EPrH: -- ~ ". -... ..-.. ... . .... .... . .... TRUE .- ME.ÅS.URED... .. VERT ICAL SUB '''''' .. D.EP..1H -. ... . . DEPTH SEA TOTAL CDORD 1 ~ATES ". '''. . .. . .. . .-. n- . -. .. . "n.. . . .... ... -.--. ..-... --a.--- .n --- o. - 8 2 . . I) 0 3 , 0 I) {ð -.--. .-. -....-..........----1..110..0. .. ...... . . 1 000. 91 e . 3 ~ 42 S 2 . 134 E -_. . .. .. .-- .2-(LltO._. 2 0 0 0 . 1 9 j e . ~'J . ;2 7 S $ I a & E . -.... . -.. . ._....3.0.110. . 3 Ó 0 0 , 291 9 , 9 . :3 9 S i 4 . 54 E ~.-..... . .._..._...4-0_0l)"'-_._.... 40.00. 3918. 8.30 S 13.03 E ( i...-. ...... -.-.5.0..011.. ..... ... 5000. 4917. 15. 98 8 13 ,03 E ~.... . . ..6..11 .0...0. . . . . 595 1 . 5869 , 25 . 1 1 ri 2 9 7 , 1 7 E ~-_... ---.-..-....--._..-Z1l011......-.........-... .. .. 684..5. 6763, 61122 N 743 146 E ~_...._..........._._._.8J)JlíL........._... . 7760. 7677. 50,06 H t147104 E 1-.--............ .......... ...._._.i.O..o..o......... 9'86, 8603. 13. j 4 S 1517. j 3 E 1--... ... ..... ..........._..91l2ß..... ... 8'705. 8622. 14 I 63 9 1523.30 E ~~~===:~:~_: .. .. . "'''.''''-''''''''''.-'''''''''''''-'''''-.''''''-''''''-'''-''-'-''.'''''.'--.. ''''M ,n..... -....... _..m ....-. ......... ,"---"_____n_...' ....... ..... --.... ..... ... ....... --. _-0. ----... .. .... ... .. - . . . . - .. . .. . .. .. . '."' . ---".". "'" . ---------...-.---.--.-..-... . ... .. ..-....-...-......... ""'--'-------"-"-.--- .....-......" - ,".... .. '---"._-"'''-'----~:~=.~~'~=~~:::::~.~:~:.'.~.. ~...... . .. .' ( ___.._m......._.......--.-...-------...-................., -,",",. .""-'"'" .__n".""_---'-'---'--", ...... .. -..-.-. . .....,- '''.'-'__.-0_.''-'''''.' ... "' t=~~==---~~~_::_-.. -.. .... .. --. - ...... . -. . ..... ... ~_._--_..........__... -...-..-....---...- -... -.... ............ . .. .... f~:-- _:~~==~~~~:~-:_. --. .. .. . .. .. . - --: .: .. -. ...... ...... ... :- E~;-c;~.=:-~-~-- .. ... (' - . .. (..- ---'----'148--" ~__..~''\.--I__'--._':'--:'------- ~ -""---" -~-- .----.-.- -"---,-.- WELL LOG INVENTORY PAGE 1 of LOG CDM (mudlog) DIL/SFL · (dual induction log) LOG COUNT DATE REC RUN# CNFD (compensated neutron density) (compensated neutron formation/ litho-density) CFD (compensated formation density) BHC/SL (borehole compensated sonic) LSS (long spaced sonic) SSS (short spaced sonic) CYB (eyberlook) GCT (groscopic survey) DIPMETER SAMPLES: Required yes (n~ Date Received: Comments: ProduclJon Company 900 ~a$! ~n~on ~ulev P.O. ~. 196~i2 Anchorage. Alaska ~5 HOUSTON ARCO CHEVRON EXXON TEXACO TO: MOBIL PHILLIPS STATE OF ALASKA GEOSCIENCES RESERVOIR REFERENCE: ARCHIVES SAPC CASED HOLE FINAL LOGS i NOEXED STANDARD ALASKA PRODUCTION 0ate: Ti: 01-30-89 79779 The following material-Is being submitted herewith. Please acknowledge receip~ by signing a copy of this letter and returning It to thls office: C-17 PIT/HPFM 10-07-89 #1 ' 11300-11600 Camco 5" E-26 PROD-F 01-06-89 #1 9350-9550 Camco 5" R-31 Perf/Inj-F 01-17-89 #1 10150-10850 Camco 5" W-O1 Prod-F 01-10-89 t/1 12200-12450 Camco 5" M-12 I Inj-F 01-08-89 #1 ' 9800-10250 Camco 5" W-18 Prod-F 01-05-89 #I 9100-9450 Camco 5" W-38 Prod-F 01-09-89 #1 14200-14680 Camco 5" Received O~te Oas Ccr.~. Commission ,4. un,f Oi Ihe Oz,cJ~noi Slando,d (~1 Comoony Founded ,n Cle',,etand, Oh0o. ,n 1870. Shirley R. McCurry INFORMATION CONTRO~ Well Records LR2-1 Standard Alaska ~.~--~. Product/on Company. 900 East Ben,on 8oulevo. P.O. 8ox 196612 Anchorage. AIo~ka 99§19-6612 (907) 564-5 I I ! INDEXED TO: HOUSTON ARCO CHEVRON E~ON TE~YACO MOBIL PHILLIPS STATE OF ALASKA ARCHIVES STANDARD ALASKA PRODUCTION Oate: 01/07/89 79701 REFERENCE: SA.PC FINAL DATA - PRESSURE SURVEY DATA The following material Is being submitted herewith. Please acknowledge receipt by signing a copy of this let~rer and returning it to this office: G-30 Static Gradient 11/04/88 Camco W- 18 StSc Gradient 12/I 3/88 Camco Y- I 0 Sta~c Gradient 12/I 9/88 Camco Z- 28 Static Gradient 12 / 17 / 88 Camco 0il .& Gas COns. C, ommissiom Rece I ved Date .... ~-~u.' ~l;~O~r;~O~ A unil DJ the or,g,not Stondo,d O,I Compony FOunded in Cle~etono. ~,o. ,n 1870 Jennifer Dietz I NFORMAT I ON CONTROL Wel I Records LR2-1 Standard Alaska Production Company 900 East Benson Boulet.. P.O. Bo= 19661~ Anchorage. AIoska 99519-66 (907) 564-5! I I HOUSTON ARCO -CHEVRON EXXON TEXACO TO: MOBIL PHILLIPS STATE OF ALASKA GEOSCIENCES RESERVOIR REFERENCE: ARCHIVES SAPC CASED HOLE FINAL LOGS I NOEXED STANDARD ALASKA PRODUCTION Date: 01/04/89 79693 The following material ls being submitted herewith. Please acknowledge receipt by signing a copy of this letter and returning it to this office: B-05 GR/CCL 12/16/88 #I 10000-11872 Camco 5" E-06 GR/CCL 12/16/88 #I 8400-9478 Camco 5" GC-2C Inj F 12/13/88 #I 4850-5800 Camco 5" R-05 P~rf-R 12/28/88 #I 8994-9510 Sch 5" S-18 Gas Lift T~mp 12/14/88 #I Surf-11993 Camco 5" W-18 GR/CCL 12/13/88 #I 8500-9501 Camco 5" W-27 CBT 12/27/88 #I 10210-11631 Sch 5" W-27 CET 12/27/88 #I 10210-11652 Sch 5" Z-28 GR/CCL 12/17/88 #I 9050-10202 Camco 5" Received Date A un'l ot the o,,gmot Slando,d C~t Compony Founded ,n Clevelond. Ohio. ,, 1870. Alaska Oil & ~: Cc~:. CcmmfssL~ Jennifer Dietz I NFORJ~AT I ON CONTROL Wel I Records LR2-1 Sfondard Alas&a . Produ¢6on Company 900 ~o,,1 Ben,.on Boule,,o,d PO ~. t96612 An(~oroge. AlosLO 995 (907~ 564-511 I ARCO EXXON PHILLIPS , sT.~T~ o STANDARD ,",,[...,'\"k..", ;'~'~,- :;~ ~i .!( ':' ~2/05/ss Date: 79612 T#: SYSTEMS (TransmiLta/ & Tape) ARCit IVES REFE4ENCE: SAPC ,%\GNETIC LIS TAPES & LISTINGS The following material is being sukraitt~ herewith. Please acknowledge receipt by signing a copy of this letter.and returning it to this office: W-18 OH/ DIFL/BHC/$ CNraw data 11/25/88 #- 6974-9576 Tape Pos.#06211 Atlas#3611 1600bpi API#50-029-21880 * E)LXON: An Asterisk (*) next to a listing above means you should have received the Tape(s) and Listing(s) directly from the respective service company. Please confirm D~C'~ ~ '-- Date ~n ~ll & ~S i~,!· A ~,~,l 0~ ~he O~.9.nOI ~o"do,d ~1 ~C'"L',~ ', Jennifer Dietz Well Records IR2-1 Slandard Alaska P~oduction Compan., 900 East Ben$on Boulevard P.O. ~ Anchorage. Alaska 995 HOUSTON ARCO CHEVRON EXXON TEXACO TO: MOBIL PHILLIPS STATE OF ALASKA GEOSCIENCES RESERVOIR REFERENCE: ARCHIVES SAPC CASED HOLE FINAL LOGS I NDEX£O STANDARD ALASKA PRODUCTION Date: 12-01-88 TI: 79606 The following material Is being submitted herewith. Please acknowledge receipt by slgnlng a coPy of this letter and returning it to this office: W-18 W-18 W-18 'R-22 W-34 R-13 CBT 11-28-88 #1 8654-9483 Sch 5" CET 11-28-88 #1 8654-9502 Sch 5" Comp 11-28-88 #3-5 9050-9450 Sch 5" GST 11-28-88 #1 10500-.1'Q727 Sch 5" Perf 11-25-88 #1 10350-10769 Sch 5" Prod-F 11-27-88 #1 9300-10073 Sch 5" . Race I ved Date A unit o! the orlg~nol Stondocd O~1. Company Founded in Cleveland. Oflio. in 1870, Shirley R. McCurry ~ NFORMAT I ON CONTROL Wel I Records LR2-1 'MEMO . NDOM State of Alaska ~ ALASKA OIL AND~GAS CONSERVATION COMMISSION TO: Lonnie C Smith ~ ~J~/~ DATE: November 30, 1988 C ommis s ioner FILE NO: D .HRH. 69 THRU: Michael T Minder///~ ~~'~'/~' Sr Petroleum Engineer TELEPHONE NO: SUBJECT.' BOP Test SAPC PBU W- 18 Permit No. 88-128 Prudhoe Oil Pool FROM: Harold R Hawkins Petroleum Inspector~ ~ Tuesday, November 15, 1988: I left Anchorage at 7:15 a.m. by Alaska ~ir'%ine~,~"arriving at prudhoe Bay at 8:45 a.m. I arrived at SAPC PBU W-18 (41-21-11-12) at 9:15 a.m. to witness a BOP test. When I arrived on location the BOP stack was almost nippled up to test. Then problems started. The speed head was loosened when an attempt was made to connect the choke line to the BOP stack. The stack had to be nippled down to pick stack up from speed head so as to tighten speed head up. Testing of BOP started at 6:00 p.m. Three failures right at the start stopped the testing. The right ram shaft packing failed, and two new valves on the speed head failed. Wednesday, November 16, 1988: I consulted with the SAPC operator, Don WeSter,"and"the Nab°r~-~2E tool pusher on how to retrieve the ram shaft and pack. assembly from the BOP housing, as they requested my expertise. At 4:00 a,m. testing resumed. There were four more failures. The top drive BOP (kelly) failed; a choke valve on the manifold failed; and the secondary pump on the accumulator failed. One bank of four accumulator bottles was out of service. Time finished, 8:00 a.m. In summary, as far as procedures and testing was concerned, it was satisfactory on Nabors 22E~ but I am quite concerned, because of the time it took and problems with this test, whether the BOP tests are being performed completely when an inspector is not present. SAPC is to call AOGCC when failures are repaired. -~ ,: Attachment Saturday, November 19~ 1988: Don Wester, operator for SAPC, called me-'"a~'d' Said 'all' fail~'u~eS were repaired and tested. 02-00~"A (Rev. 8~85) . O&G ~/4 5 / ~ STATE OF ALASKA ALASKA 0IL & GAS CONSERVATION COMMISSION B.O.P.E. Inspection Report Inspector Well 0perator,,~/~' LocatiOn: Sec ~ f T t/~/Rf2M M Drillin~ Contractor Location, General ~ Well Signz~ General Housekeeping ~y~ Rig Reserve Pit ~ Mud Systems Visual Trip Tank w/ Pit Gauge ~/ Flow Monitor ~/ Gas Detectors ~/ Audio BOPE Stack Annular Preventer Pipe.Rams Blind Rams Choke Line Valves H,C,R, Valve Kill Line Valves Check Valve Test ResUlts: Failures Test Pressure Representative DD~-~ ~-~ 7]~_/~/casing set @ ,Za ~'~ ~t. Ri~ i~ ~ Representative ~~AND ACC~ATOR SYSTEM Full Charge Pressure ~~ psi~ Pressure After Closure / ~ psig. Pump incr. clos, pres. 200 psig~ -- min~ sec. Full Charge Pressure A~ed: ~ min/~ sec. N~ ~ ~T~~ ~ ~ ~0~ ps~ Controls: Master Remote ~f< Blinds switch cover Kelly and Floor Safety Valves Upper Kelly Lower Kelly Ball Type Inside BOP Choke Manifold No. Valves / ~ No, flanges J ~ Test Pressure ~ Test Pressure ~--~m~ Test Pressure ~ Test Pressure ~-'~ Test Pressure Adjustable Chokes C2/~z~= Hvdrauica!ly operated choke Test Time ~ hrs, Repair'~0r Replacement of failed equipment to be made within days and Inspector/ Commission office, notified, Remarks: Distribution orig, - AO&GCC cc - Operator cc - Supervisor October 31, 1988 Telecopy: (907)276-7542 Mr. Ted Stagg . Endicott Drilling Engineering Supervisor Standard Alaska Production Company ?.0. Box 196612 Anchorage, Alaska 99519-6612 Prudhoe Bay Unit W-18 Standard Alaska Production Company Permit No. 88-128 Sur. Loc. 731'SNL, l182'WEL, Sec. 21, TllN, R12E, UM. Btm~ole Loc. 902'SNL, 45'WEL, Sec. 21, TllN, R12E, UM. Dear Mr. Stagg.. Enclosed is the approved application for permit to drill the above referenced well. The permit to drill does not indemnify you from the probable need to obtain additional permits required by law from other governmental agencies prior to commencing operations at the well site. To aid us in scheduling field work, please notify this office 24 hours prior to commencing installation of the blowout prevention equipment so that a representative of the Commission may be present to witness testing of the equipment before the surface casing shoe is drilled. Where a diverter system is required, please also notify this office 24 hours prior to commencing equipment installation so that the Commission may witness testing before drilling below the shoe of the conductor pipe. ~ tr~ly~Du~s, ." ,/ -~/ ,'. ./ .... , : C. V. Chatterton Chairman of Alaska Oil and Gas Conservation Commission BY ORDER OF THE COb~-IISSION dlf Enclosure cc: Department of Fish & Game, Habitat Section w/o encl. Department of Environmental Conservation w/o encl. STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION PERMIT TO DRILL 20 AAC 25.005 la. Type of work Drill [] Redrilll-Illb. Type of well. Exploratoryl-I Stratigraphic Testl-I Development OilE] Re-Entry [] DeepenI-iI Service [] Development Gas [] Single Zone [] Multiple Zone[] 2. Name of Operator 5. Datum Elevation (DF or KB) 10. Field and Pool Standard Alaska Production Comoanv KB = 82 feet Prudhoe Bay Field/Prudhoe 3. Address ' 6. Property Designation Bay Pool P. O. Box 196612. Anchorage. Alaska 99519-6612 ADL 4. Location of well at surf-ace 7. Unit or property Name 11. Type Bond(see 20 AAc 25.025) 731'SNL, 1182' WEL, SEC. 21, T11N, R12E Prudhoe Bay Unit At top of productive interval '8. Well number Number 875' SNL, 225' WEL, SEC. 21, T11N, R12E W- 18 (41-21-11-12) KOO683449-G-14 At total depth 9. Approximate spud date Amount 902' SNL, 45' WEL, SEC. 21, T11N, R12E November 1, 1988 $200,000.00 12. Distance to nearest 13. Distance to nearest well 4. Number of acres in property15. Proposed depth(UDandTVD) property line ADL 47452 4379 feet W-17 35 feet 2560 9520°MD 9158'TVDfeet 16. To be completed for deviated wells 17. Anticipated pressure (see 20 AAC 25.035 (e)(2)) Kickoff depth 700,~ feet Maximum hole angle 41.90 Maximum surface 3330 pslg At total depth (TVD) ~(~(~ 4390 pslg 18. Casing program Specifications Setting Depth s~ze Top Bottom Quantity of cement Hole Casing Weight Grade Coupling Length MD TVD M D TVD (include stage data) 20" Cond. ~ ' Surface 110' 110' 8 cu yds Concrete 17-1/2" 13-3/8" 68# L-80 Butt 2650' Surface 2680' 2680' 3723 cu fl Permafrost 12-1/4" 9-5/8" 47# L-80 NSCC 4470' Surface 8871' 8676' 1795 cu ft Class G 8-1/2" 7" 26# L-80 IJ4S 899' 8621' 8489' 9520' 9158' 273 cu fl Class G 19. To be completed for Redrill, Re-entry, and Deepen Operations. Present well condition summary Total depth' measured feet Plugs (measured) true vertical feet Effective depth: measured feet Junk (measured) true vertical feet Casing Length Size Cemented Measured depth True Vertical depth Structural Conductor Surface Intermediate Production Perforation depth' measured true vertical 20. Attachments Filing fee [] Property plat [] BOP Sketch [] Diverter Sketch [] Drilling program [] Drilling fluid program [] Time vs depth pict [] Refraction analysis [] Seabed report[] 20 AAC 25.050 requirements[] 21. I hereby~:),~,~///~c"certif--Y th/~ t~,fforegoing is true and correct to the best of my knowledge ?,..7,~/~// Signed Title PBU Drifting Engineering Supervisor Date/ ' ' [ ' /'~ Commission Use Only Permit Number IAPI number IApproval date See cover letter ~_/~_..? 15o-47 ~_.?'... ~_../~"~'c~ I 10/3~./88 for other requirements Conditions of approval Samples required [] Yes .]~ No Mud Icg require, e,e~d [] Yes.~I~No Hydrogen sulfide measures [] Yes ~.[~ No Directior~l., survey required ..1~ Yes [] No Required wor~~ ~r/~~; J~5M; F'll OM; []15bi; Other: by order of Approved bylk. · ,,~', (, '~~~ Commissioner ~ne commission Date _. Form 10-401 ~eT. 12-1-85 Submit PR~_~SED DRILLING AND COMPLETION PRO ~.~M WELL W-18 [41-21-11-12] PBU Install .and cement 80' of 20" conductor to surface. The drilling fluid program will consist of an 8.5-9.5 ppg spud mud in the 17-1/2" hole, a 9.0-9.7 ~pg water base mud in the 12-1/4" hole and a 9.5 ppg water base mud in. the 8-1/2" hole. Drill 17 1/2" hole to 2700' and cement 13 3/8" L-80 Buttress casing to surface. Install blowout prevention equipment consisting of 5000 psi W.P. pipe rams, blind rams, and annular preventer. Maximum possible bottomhole pressure is 4390 psi at 8800' TVDss based on original resevoir pressure. Maximum possible surface pressure is 3330 psi based on a gas column to surface from 8600' TVDss and an oil column to 8800' TVDss. Directionally drill 12 1/4" hole to the 9-5/8" casing point above the Sadlerochit Sandstone. Run 9 5/8" 47# L-80 NSCC casing to within 5' of 12 1/4" TD and cement in two stages: First stage using Class G cement around the ~ 5/8" shoe. The second stage to be downsqueezed in the 13 3/8" x 9 5/8" annulus followed by nonfreezing fluid. Directionally drill 8 1/2" hole to TD. Run 7" liner from TD to 250' inside 9 5/8" casing shoe and cement using Class G cement. Clean out to 7" float equipment. Change over to 9.6 ppg. NaC1 completion fluid. Test casing and lap to 3000 psi. Run 9 5/8" production packer on internal plastic coated tubing with a sliding sleeve. Set packer 50' above top of liner. A subsurface safety valve with dual control lines will be placed 50' below base of permafrost. Install and test Xmas tree. Displace tubing to diesel. Set and test packer. Shut down rig operations for perforating subsequent to rig release. The well will be perforated in accordance with normal practices. Tubing Size: 3.5",9.3#,L-80,AB MOD EUE Tailpipe Size: 3.5",9.3#,L-80,EUE JLW:lS-OCT-88 PROPOSED DOWNHOLE DIAGRAM WELL W-18 [41-21-11-12] PBU/EWE PROPOSED DEPTH BKB 20" Conductor Ball Valve 110' 1912' 13-3/8" Casing Shoe 17-1/2" Open Hole 2680' 2700' 3-1/2" 9.3# L-80 A/B Mod. EUE tubing with 8 GLM's 9-5/8" Packer 8571' 7" Tieback Assembly 8621' %5/8" Shoe 12-1/4" Open Hole 8871' 8876' 7" 26# L-80 IJ4S Liner 7" PBTD 7" Liner Shoe 8-1/2" Open Hole 9480' 9520' 9520' G.O.P. STACK CONFIGURATION 13-5/§ IN. TRIPLE RAM STACK S000 PSI WP DRILLING ANNULAR PREVENTER ! PIPE RAMS ! ! I BLIND RAHS 2 IN. KILL LINE GATE GATE ! I DRILLING SPOOL ! ! PIPE RAHS ! I 4 IN. CHOKE LINE ! GATE GATE A NORTH WELL Ne W- 18 -- 8U R FAGE LC)GAT ION LAT. · ?0° 17' 54. 129' LONG. · 149° 05' $$. 265" 959, 525.88 A..S.P. 61 :~ , 049. 05 ZONE 4 73 I' FROM W. LINE SECT. 21 1182' FROM E. LIKE S[~T. 21 CERTIFICATE OF SURVEYOR: I HEREBY CERTIFY THAT I AM PROPERLY REGISTERED AND LICENSED TO PRACTICE LAND SURVEYING IN THE STATE OF ALASKA AND THAT THIS PLAT REPRESENTS A LOCATION IURVIry MADE BY NE OR UNDER MY ~:UlleERVISION. AND THAT ALL DIMENSIONS AND OTHER DETAILS ARE CORRECT. SURVEYOR DATE: ~CALE ; WELL PAD'W' -- WELL N° W-18 AS-BUILT · LOCATED IN PROTRACTED SECT. ffl , T. II N. , R. 12 [., U.M. IURVEYED FOR ; I PREPARED BY · KUUKPIK - .1 TECHNICAL BERV. INC. [!'GAWk SY: G.T PRU~OE SAY ~ ............ ..... irll-! I i I i i i .... i SUMP · W-24 · W-lB W-I? · W* 14 · W-I · W-2 · W-$ · · W-5 · · W.? · · · W-lO · W-Il · W- ~2 118::)' NE CORN OF I[CT. Z~ Il. · 'ak, I IIORT N' · WELL PAD'I" ir · WELL Ne W-18 AS-BUILT LOCATED k P~OTIACTED I~:C:T. II , T. tl I. , I. I~ [., U.II SUM P SHEET 2 OF 2 IURY[Y[D FOR : ~ A[ASx.~ Pt~OC)UC~O, CO PIEPARE~ BY ~ KUUKPIK - TECHNICAL SERY. INC. Pt U D4,10[ lAY OFFICE _ Bdt~,WR I~: IT. ILK -- Search Radius= 200 7 DEGREE LEAD LINE For proposed well: W-18 [41-21-11-12] Location = W-E S-N TVD(SBS) Top 612049.00 5959526.00 -82.00 Bottom 613099.44 5959512.80 8965.00 Note: Ail depths in feet Below Kelly Bushing (BKB) Closest Approach Analysis Date: 18-OCT-88 Time: 10:45:46 WELL IDENT Closest Approach /PROPOSED~ /NEARBY~ TVD DEPART TVD DEPART A029-2180800 W-20 2802.1 0.0 2802.1 19.5 A029-2183300 W-24 3799 .9 0.0 3799.8 23.1 A029-2185600 W-17 0 .4 0.0 0.0 0.0 SUMMARY The well which comes closest to the proposed well is: A029-2185600 W-17 Closest approach distance = 35.0 feet KICK OFF for this run = 7000.0 feet CLOSEST DISTANCE 56.5 195.3 35.0 Vertical /PROPOSED% TVD DEPART Intersection /NEARBY~ TVD DEPART VERTICAL DISTANCE 8205.4 343.2 2281.7 344.5 -5923.4 Search Radius= 200 COURSE LINE For proposed well: W-18 [41-21-11-12] Location = W-E S-N TVD(SBS) Top 612049.00 5959526.00 -82.00 Bottom 613090.00 5959384.88 8965.00 Note: Ail depths in feet Below Kelly Bushing (BKB) Closest Approach Analysis Date: 18-OCT-88 Time: 10:44:51 Closest Approach WELL IDENT /PROPOSED~ /NEARBY~ TVD DEPART TVD DEPART A029--2180800 W-20 2802.1 0.0 2802.1 19.5 A029-2183300 W-24 3799.9 0.0 3799.8 23.1 A029-2185600 W-17 0.4 0 .0 0.0 0.0 SUMMARY The well which comes closest to the proposed well is: A029-2185600 W-17 Closest approach distance = 35.0 feet KICK OFF for this run = 7000.0 feet CLOSEST DISTANCE 56.5 195.3 35.0 Vertical /PROPOSED~ TVD DEPART Intersection /NEARBY~ TVD DEPART VERTICAL DISTANCE 7780.6 137.1 1839.9 136.9 -5940.2 NABORS RIG NO. 22E MUD/SOLIDS CONTROL EQUIPMENT 1 - Brandt Dual Tandem Shale Shaker 2 - Triflow 16" Cone Mud Cleaners 1 - Demco 416H w/16 cones & (1) Demco 48H w/16 cones (Desilter) 1 - Gasaway Vacuum Mud Degasser 2 - Pioneer 100 gpm Capacity Centrifuges ,, 1 - Brandt CF-2 200 gpm Capacity Centrifuge 19- Brandt MA5 Mud Mix Agitators 1- Trip Tank 1- Recording drilling fluid pit level indicator with both visual and audio warning devices at driller's console 1- Drilling fluid flow sensor with readout at driller's console 1- Caviem Dewatering screen assembly , i, CENTRIFUGE I~ONEER MK I MIX HOPPERS SUCTION TANK ML~ PUMPS 2- Emsco FB 1600 Triplex Pumps ii 11 GASAWAY DEGASSER MUD CLEANER +2 TRIFLOW MUD CLEANER ~ 1 TRIFLOW TO PIT STAND --~ KI.L UNE WATER-VOLUME TANK FILL LINE V~.UM E TANK SHAKER TANK FLOW L~IE TO FLARE NABORS DRILLING RTD RIG No. 22E MUD SYSTEM SURFACE FACILITIES TOTAL ACTIVE SYSTEM: 948 BBL TOTAL SURFACE CAPACITY : 1200 BBL CHECK LIST FOR NEW WELL PERMITS Company ~-zz%~ CcD Lease & Well No. ITEM APPROVE 'DATE - YES NO (1) Fee 1. Is the permit fee attached .......................................... (2) Loc /~_ (2 thru 8) -- (3) Admin '(9 thru 1 .... 10. (10 and 13) 12. 13. ( 4 ) C a s ~ ~~F, ?~-*~ ~" ~M (14 thru 22) (23 thru 28) 14. 15. 16. 17. 18. 19. 20. 21. 22. 2. Is well to be located in a defined pool ............................. 3. Is well located proper distance from property line .................. 4. Is well located proper distance from other wells .................... 5. Is sufficient undedicated acreage available in this pool 6. Is well to be deviated and is wellbore plat included ................ ly ty 7. Is operator the on affected par ................................ 8. Can permit be approved before fifteen-day-wait ...................... 23. 24. 25. 26. 27. 28. Does operator have a bond in force .................................. ~f,~_ Is a conservation order needed ...................................... Is administratiVe approval needed ................................... Is the lease number appropriate ..................................... ~ki. Does the well have a unique name and number ......................... f~ Is conductor string provided ........................................ Will surface casing protect all zones reasonably expected to serve as an underground source of drinking water ..................... Is enough cement used to circulate on conductor and surface ......... Will cement tie in surface and intermediate or production strings ... Will cement cover all known productive horizons ..................... Will all casing give adequate safety in collapse, tension and burst.. Is this well to be kicked off from an existing wellbore ............. Is old wellbore abandonment.procedure included on 10-403 ............ Is adequate wellbore separation proposed ............................ Is a diverter system required ....................................... -~ Is the drilling fluid program schematic and list of equipment adequate/~z~ Are necessary diagrams and descriptions of diverter and BOPE attached.~ Does BOPE have sufficient pressure rating - Test to ~~ psig .. z~ Does the choke manifold comply w/API RP-53 (May 84) .................. Is the presence of H2S gas probable ................................. ,~ (29 thru 31) (6) Add: '/~.~f /~'~'~.~ Geology: En~ig!~ering: .cs -?<' J' rev: 08/11/88 6.011 For exploratory and Stratigraphic wells: 29. Are data presented on potential overpressure zones? ................. 30. Are seismic analysis data presented on shallow gas zones ............ 31. If an offshore loc., are survey results of seabed conditions presented 32. Additional requirements ............................................. POOL INITIAL CLASS STATUS GEO. AREA UNIT NO. o~/o~'~' SHORE Additional Remarks: / Well History File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history file. To improve the readability of the Well History file and to simplify finding information, information, of this nature is accumulated at the end of the file under APPENDIX: ,, No special'effort has been made to chronologically i. ,o organize this category of information. * ALASKA COMPUTING CENTER * . . ****************************** . ............................ * . ....... SCHLUMBERGER ....... * . ............................ * ****************************** OCT 1 5 t997 ,qlas~a Oil & Gas ~n~. COMPANY NAME : BP EXPLORATION (ALASKA) INC. WELL NAME : W- 18 FIELD NAME : PRUDHOE BAY BOROUGH · NORTH SLOPE STATE : ALASKA API NUMBER : 50-029-21880-00 REFERENCE NO : 97442 MED LIS Tape Verification Listing Schlumberger Alaska Computing Center 9-0CT-1997 00:51 PAGE: **** REEL HEADER **** SERVICE NAME : EDIT DATE : 97/10/ 9 ORIGIN : FLIC REEL NAME : 97442 CONTINUATION # : PREVIOUS REEL : COGENT : BP EXPLORATION (ALASKA), PRUDHOE BAY, W-18, API #50-029-21880-00 **** TAPE HEADER **** SERVICE NAME : EDIT DATE : 97/10/ 9 ORIGIN : FLIC TAPE NAME : 97442 CONTINUATION # : 1 PREVIOUS TAPE : COGENT : BP EXPLORATION (ALASKA), PRUDHOE BAY, W-18, API #50-029-21880-00 TAPE HEADER PRUDHOE BAY CASED HOLE WIRELINE LOGS WELL NAME: W - 18 API NUMBER: 500292188000 OPERATOR: BP EXPLORATION (ALASKA) INC. LOGGING COMPANY: SCHLUMBERGER WELL SERVICES TAPE CREATION DATE: 9-0CT-97 JOB NUMBER: 97442 LOGGING ENGINEER: J. SPENCER OPERATOR WITNESS: K. BARDWELL SURFACE LOCATION SECTION: 21 TOWNSHIP: 1 IN RANGE: 12E FNL: 731 FSL: FEL: 1182 FWL: ELEVATION (FT FROM MSL O) KELLY BUSHING: 82.40 DERRICK FLOOR: 82.40 GROUND LEVEL: 52.90 WELL CASING RECORD OPEN HOLE CASING DRILLERS CASING BIT SIZE (IN) SIZE (IN) DEPTH (FT) WEIGHT (LB/FT) 1ST STRING 9. 625 9003.0 47. O0 2ND STRING 7. 000 9550.0 26. O0 3RD STRING 3.500 8770.0 9.20 PRODUCTION STRING 3.500 9363.0 9.20 CURVE SHIFT DATA - ALL PASSES TO STANDARD (MEASURED DEPTH) LIS Tape Verification Listing Schlumberger Alaska Computing Center 9-0CT-1997 00:51 BASELINE CURVE FOR SHIFTS LDWG TOOL CODE: BCS LDWG CURVE CODE: GR RUN NUMBER: PASS NUMBER: DATE LOGGED: 25-NOV-88 LOGGING COMPANY: WESTERN ATLAS .......... EQUIVALENT UNSHIFTED DEPTH .......... BASELINE DEPTH GRCH CNTD 88888.0 88889.0 88889.0 9336.5 9337.5 9337.5 9318.5 9318.5 9318.5 9310.0 9308.5 9289.5 9289.5 9289.5 9252.0 9252.0 9252.0 9236.0 9236.0 9200.5 9200.5 9200.0 9200.5 9173.5 9173.5 9173.0 9173.5 9140.0 9140.5 9139.5 9140.5 9109.5 9109.5 9109.5 9096.5 9097.0 9097.0 9085.5 9085.0 9085.0 9038.5 9038.5 9038.0 9038.5 9016.5 9016.5 9016.5 8976.5 8976.5 8963.0 8963.0 8963.0 8946.0 8945.5 100.0 100.0 99.5 $ REMARKS: This tape contains the LDWG edit for BP Exploration well W-18 CNTD. There are three baseline passes an average pass and three raw data passes. The depth adjustments shown above reflect cased hole GR to open hole GR and cased hole NPHI to open hole GR. Ail other CNTD curves were carried with the NPHI shifts. Primary depth control GR provided by client. $ $ PAGE: **** FILE HEADER **** FILE NAME : EDIT .001 SERVICE : FLIC VERSION : OOiCO1 DATE : 97/10/ 9 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : LIS Tape Verification Listing Schlumberger Alaska Computing Center 9-0CT-1997 00:51 PAGE: FILE HEADER FILE NUMBER: 1 EDITED CURVES Depth shifted and clipped curves for each pass in separate files. PASS NUMBER: 1 DEPTH INCREMENT: 0.5000 FILE SUMMARY LDWG TOOL CODE START DEPTH STOP DEPTH GRCH 9350.0 8939.0 CNTD 9350.0 8939.0 $ CURVE SHIFT DATA - PASS TO PASS (MEASURED DEPTH) BASELINE CURVE FOR SHIFTS LDWG CURVE CODE: NONE PASS NUMBER: BASELINE DEPTH $ .......... EQUIVALENT UNSHIFTED DEPTH .......... GRCH CNTD REMARKS: This file contains CNTD Pass #1. shifts were applied to this data. $ LIS FORMAT DATA NO pass to pass ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE- 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 44 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 23 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 0 LIS Tape Verification Listing Schlumberger Alaska Computing Center 9-0CT-1997 00:51 PAGE: ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) O0 000 O0 0 1 1 1 4 68 0000000000 DEPT FT 1102694 NPHI CNTD PU-S 1102694 O0 000 O0 0 1 1 1 4 68 0000000000 NRAT CNTD 1102694 O0 000 O0 0 1 1 1 4 68 0000000000 CRAT CNTD 1102694 O0 000 O0 0 1 1 1 4 68 0000000000 NCNTCNTD CPS 1102694 O0 000 O0 0 1 1 1 4 68 0000000000 FCNT CNTD CPS 1102694 O0 000 O0 0 1 1 1 4 68 0000000000 CFTC CNTD CPS 1102694 O0 000 O0 0 1 1 1 4 68 0000000000 CNTC CNTD CPS 1102694 O0 000 O0 0 1 1 1 4 68 0000000000 GRCH CNTD GAPI 1102694 O0 000 O0 0 1 1 1 4 68 0000000000 TENS CNTD LB 1102694 O0 000 O0 0 1 1 1 4 68 0000000000 CCL CNTD V 1102694 O0 000 O0 0 1 1 1 4 68 0000000000 ** DATA ** DEPT. 9351. 000 NPHI. CNTD 26.1 O1 NRAT. CNTD 4. 642 CRAT. CNTD NCNT. CNTD 3266. 667 FCNT. CNTD 883. 333 CFTC. CNTD 912. 235 CNTC. CNTD GRCH. CNTD 21 . 547 TENS. CNTD 1250. 000 CCL. CNTD O . 000 DEPT. 8938. 500 NPHI. CNTD 49. 675 NRAT. CNTD 7.176 CRAT. CNTD NCNT. CNTD 2006. 376 FCNT. CNTD 283. 333 CFTC. CNTD 295.278 CNTC. CNTD GRCH. CNTD -999.250 TENS. CNTD 1310. 000 CCL. CNTD O. 000 4.559 3775.094 7.287 2103.688 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .001 SERVICE : FLIC VERSION : O01CO1 DATE : 97/10/ 9 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE **** FILE HEADER **** FILE NAME : EDIT .002 SERVICE : FLIC VERSION : O01CO1 DATE : 97/10/ 9 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : LIS Tape Verification Listing Schlumberger Alaska Computing Center 9-0CT-1997 00:51 PAGE: FILE HEADER FILE AFJ~fBER : 2 EDITED CURVES Depth shifted and clipped curves for each pass in separate files. PASS NUMBER: 2 DEPTH INCREMENT: 0.5000 FILE SU~9~ARY LDWG TOOL CODE START DEPTH STOP DEPTH GRCH 9350.0 8944.0 C~FfD 9350.0 8944.0 $ CURVE SHIFT DATA - PASS TO PASS (MEASURED DEPTH) BASELINE CURVE FOR SHIFTS LDWG CURVE CODE: GRCH PASS NU~BER: 1 .......... EQUIVALENT UNSHIFTED DEPTH .......... BASELINE DEPTH GRCH CNTD 88888.0 88889.0 88889.0 9342.5 9343.5 9336.5 9337.5 9335.5 9336.0 9320.5 9321.0 9318.5 9318.0 9318.5 9314.5 9313.5 9310.0 9308.5 9304.5 9303.5 9293.5 9293.0 9289.0 9289.0 9268.5 9268.0 9266.5 9266.0 9253.5 9253.5 9252.0 9252.0 9243.0 9242.5 9235.0 9234.5 9222.0 9221.5 9221.5 9221.0 9200.0 9200.0 9200.5 9173.5 9173.5 9173.5 9153.5 9153.5 9140.0 9140.0 9139.5 9140.0 9114.5 9114.0 9109.5 9109.0 9102.5 9102.0 9097.0 9097.0 9094.0 9093.5 9089.0 9089.0 9082.5 908i.5 9076.5 9076.0 9073.0 9072.0 LIS Tape Verification Listing Schlumberger Alaska Computing Center 9-0CT-1997 00:51 PAGE: 9052.5 9052.5 9038.5 9038.5 9038.5 9016.0 9016.0 9014.5 9015.0 9009.0 9009.0 8993.0 8993.0 8978.0 8978.0 8963.5 8963.5 8961.5 8961.5 8952 . 5 8952.5 100.0 100.0 100.0 $ REMARKS: This file contains CNTD Pass #2. The depth shifts shown above relect GRCH pass #2 to GRCH pass #1 and NPHI pass #2 to NPHI pass #1. $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 44 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 23 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 1102694 O0 000 O0 0 2 1 1 4 68 0000000000 NPHI CNTD PU-S 1102694 O0 000 O0 0 2 1 1 4 68 0000000000 NRAT CNTD 1102694 O0 000 O0 0 2 1 1 4 68 0000000000 LIS Tape Verification Listing Schlumberger Alaska Computing Center 9-0CT-1997 00:51 PAGE: NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) CRAT CNTD 1102694 NCNT CNTD CPS 1102694 FCNT CNTD CPS 1102694 CFTC CNTD CPS 1102694 CNTC CNTD CPS 1102694 GRCH CNTD GAPI 1102694 TENS CNTD LB 1102694 CCL CNTD V 1102694 O0 000 O0 0 2 1 1 4 68 0000000000 O0 000 O0 0 2 1 1 4 68 0000000000 O0 000 O0 0 2 1 1 4 68 0000000000 O0 000 O0 0 2 1 1 4 68 0000000000 O0 000 O0 0 2 1 1 4 68 0000000000 O0 000 O0 0 2 1 1 4 68 0000000000 O0 000 O0 0 2 1 1 4 68 0000000000 O0 000 O0 0 2 1 1 4 68 0000000000 ** DATA ** DEPT. 9351.000 NPHI. CNTD 27.492 NRAT. CNTD 4.549 CRAT. CNTD NCNT. CNTD 3330.612 FCNT. CNTD 817.635 CFTC. CNTD 850.983 CNTC.CNTD GRCH. CNTD 18.766 TENS. CNTD 1405.000 CCL.CNTD 0.000 DEPT. 8944.000 NPHI. CNTD 45.909 NRAT. CNTD 7.000 CRAT. CNTD NCNT. CNTD 2579.592 FCNT. CNTD 366.667 CFTC. CNTD 390.086 CNTC. CNTD GRCH. CNTD 40.688 TENS. CNTD 1315.000 CCL.CNTD 0.000 4.735 3674.170 6.856 2712.045 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .002 SERVICE : FLIC VERSION : 0 O1 CO1 DATE : 97/10/ 9 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .003 SERVICE : FLIC VERSION : O01CO1 DATE : 97/10/ 9 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER: EDITED CURVES LIS Tape Verification Listing Schlumberger Alaska Computing Center 9-0CT-1997 00:51 PAGE Depth shifted and clipped curves for each pass in separate files. PASS NUMBER: 3 DEPTH INCREMENT: O . 5000 FILE SU~mL~RY LDWG TOOL CODE START DEPTH STOP DEPTH GRCH 9349.0 8945.0 CNTD 9349.0 8945.0 $ CURVE SHIFT DATA - PASS TO PASS (MEASURED DEPTH) BASELINE CURVE FOR SHIFTS LDWG CURVE CODE: GRCH PASS IVTJMBER : 1 BASELINE DEPTH 88888.0 9344.0 9340.0 9336.5 9327.5 9319.0 9318.5 9305.0 9298.5 9293.5 9289 5 9268 5 9253 5 9251 5 9243 0 9236 0 92245 9221.0 9215.0 9205.0 9200.5 9173.0 9153.0 9140.0 9139.5 9114.0 9109.5 9097.0 9093.5 9088.5 9082.5 9071.5 9062.5 9061.0 9039.0 9038.5 .......... EQUIVALENT UNSHIFTED DEPTH .......... GRCH CNTD 88889.0 88889.0 9345.0 9340.5 9337.5 9318.5 9289.5 9251.5 9221.0 9205.0 9173.5 9140.0 9109.0 9097.0 9062.5 9039.0 9328.0 9319.0 9303.5 9297.5 9293.5 9268.0 9253.5 9242.5 9236.0 9224.0 9214.5 9201.0 9173.5 9153.5 9140.0 9114.0 9109.0 9093.5 9088.0 9081.5 9071.5 '9061.0 9038.5 LIS Tape Verification Listing Schlumberger Alaska Computing Center 9-0CT-1997 00:51 PAGE: 9016. 9014 9004 8994 8982 8978 8974 8972. 8960. 8950. 100. 5 9016.5 5 9014.5 5 9004.0 5 8994.5 0 8981.0 0 8978.0 5 8974.5 5 8972.5 0 8960.0 0 8950.0 0 100.0 100.0 REMARKS: This file contains CNTD Pass #3. The depth shifts shown above relect GRCH pass #3 to GRCH pass #1 and NPHI pass #3 to NPHI pass #1. $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 2 3 4 5 66 6 73 7 65 8 68 9 65 11 66 12 68 13 66 14 65 15 66 16 66 0 66 66 0 66 0 73 44 66 1 0.5 FT 23 0 FT 68 1 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 1102694 O0 000 O0 0 3 1 1 4 68 0000000000 NPHI CNTD PU-S 1102694 O0 000 O0 0 3 1 1 4 68 0000000000 NRAT CNTD 1102694 O0 000 O0 0 3 1 1 4 68 0000000000 LIS Tape Verification Listing Schlumberger Alaska Computing Center 9-0CT-1997 00:51 PAGE: 10 NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) CRAT CNTD 1102694 NCNT CNTD CPS 1102694 FCNT CNTD CPS 1102694 CFTC CNTD CPS 1102694 CNTC CNTD CPS 1102694 GRCH CNTD GAPI 1102694 TENS CNTD LB 1102694 CCL CNTD V 1102694 O0 000 O0 0 3 1 1 4 68 0000000000 O0 000 O0 0 3 1 1 4 68 0000000000 O0 000 O0 0 3 1 1 4 68 0000000000 O0 000 O0 0 3 1 1 4 68 0000000000 O0 000 O0 0 3 1 1 4 68 0000000000 O0 000 O0 0 3 1 1 4 68 0000000000 O0 000 O0 0 3 1 1 4 68 0000000000 O0 000 O0 0 3 1 1 4 68 0000000000 ** DATA ** DEPT. 9350.000 NPHI.CNTD 30.114 NRAT. CNTD 4.952 CRAT. CNTD NCNT. CNTD 3494.990 FCNT. CNTD 685.714 CFTC. CNTD 707.135 CNTC. CNTD GRCH. CNTD 21.375 TENS.CNTD 1370.000 CCL.CNTD 0.000 DEPT. 8945.000 NPHI.CNTD 50.473 NRAT. CNTD 6.211 CRAT. CNTD NCNT. CNTD 1891.783 FCNT. CNTD 304.609 CFTC. CNTD 274.722 CNTC. CNTD GRCH. CNTD 43.813 TENS.CNTD 1300.000 CCL.CNTD 0.000 5.058 3560.791 7.378 2004. 929 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .003 SERVICE : FLIC VERSION : O01CO1 DATE : 97/10/ 9 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .004 SERVICE : FLIC VERSION : O01CO1 DATE : 97/10/ 9 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER: AVERAGED CURVES LIS Tape Verification Listing Schlumberger Alaska Computing Center 9-0CT-1997 00:51 PAGE: 11 Compensated Neutron: Arithmetic average of edited passes for all curves. DEPTH INCREMENT 0.5000 PASSES INCLUDED IN AVERAGE LDWG TOOL CODE PASS NUMBERS 1, 2, 3, CNTD $ REMARKS: The arithmetic average of passes 1,2 & 3 was computed after all depth shifts and clipping was applied. $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE- 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 40 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 25 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** N~V~E SERV UNIT SERVICE API API API API FILE NUMB Nr_~B SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 1102694 O0 000 O0 0 4 1 1 4 68 0000000000 NPHI CNAV PU-S 1102694 O0 000 O0 0 4 1 1 4 68 0000000000 APRAT CNAV 1102694 O0 000 O0 0 4 1 1 4 68 0000000000 CRAT CNAV 1102694 O0 000 O0 0 4 1 1 4 68 0000000000 NCNT CNAV CPS 1102694 O0 000 O0 0 4 1 1 4 68 0000000000 FCNT CNAV CPS 1102694 O0 000 O0 0 4 1 1 4 68 0000000000 CFTC CNAV CPS 1102694 O0 000 O0 0 4 1 1 4 68 0000000000 CNTC CNAV CPS 1102694 O0 000 O0 0 4 1 1 4 68 0000000000 GRCH CNTD GAPI 1102694 O0 000 O0 0 4 1 1 4 68 0000000000 LIS Tape Verification Listing Schlumberger Alaska Computing Center 9-0CT-1997 00:51 PAGE} 12 NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE C~SS MOD NUMB SAMP ELEM CODE (HEX) TENS CNTD LB 1102694 O0 000 O0 0 4 1 1 4 68 0000000000 ** DATA ** DEPT. 9351.000 NPHI.CNAV -999.250 NR~T. CNAV NCNT. CNAV -999.250 FCNT. CNAV -999.250 CFTC. CNAV GRCH. CNTD 21.547 TENS.CNTD 1250.000 DEPT. 8938.500 NPHI.CNAV -999.250 NRAT. CNAV NCNT. CNAV -999.250 FCNT. CNAV -999.250 CFTC. CNAV GRCH. CNTD -999.250 TENS. CNTD 1310.000 -999.250 CRAT. CNAV -999.250 CNTC. CNAV -999.250 CRAT. CNAV -999.250 CNTC. CNAV -999.250 -999.250 -999.250 -999.250 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .004 SERVICE : FLIC VERSION · O01CO1 DATE : 97/10/ 9 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .005 SERVICE · FLIC VERSION : O01CO1 DATE : 97/10/ 9 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER 5 RAW CURVES Curves and log header data for each pass in separate files; raw background pass in last file PASS NUMBER: 1 DEPTH INCREMENT: 0.5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH LIS Tape Verification Listing Schlumberger Alaska Computing Center 9-0CT-1997 00:51 PAGE: 13 CNTD LOG HEADER DATA 9372.5 DATE LOGGED: SOFTWARE VERSION: TIME LOGGER ON BOTTOM: TD DRILLER (FT) : TD LOGGER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : LOGGING SPEED (FPHR) : DEPTH CONTROL USED (YES/NO): 8938.0 31 -AUG-97 CP 42.2 1738 31 -AUG-97 9352.0 9352.0 8940.0 9349.0 1800.0 NO TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER CNTD TELEMETRY MODULE A TM- AA 277 CNTD COLLAR LOCATOR CALU-B 1604 CNTD COMP. NEUTRON CNTD 1 O1 $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN) DRILLERS CASING DEPTH (FT) LOGGERS CASING DEPTH (FT) 9003.0 BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE TEMPERATURE (DEGF) : BOTTOM HOLE TEMPERATURE (DEGF) : FLUID SALINITY (PPM) : FLUID LEVEL (FT) : FLUID RATE AT WELLHEAD (BPM) : WATER CUTS (PCT) : GAS~OIL RATIO: CHOKE (DEG) : SEA WATER/DIESEL/MET 140.0 239.5 NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): THERMAL SANDSTONE 2.65 BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE TOP NORMALIZING WINDOW (FT) : BASE NORMALIZING WINDOW (FT) : BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (CPS): 0 FAR COUNT RATE HIGH SCALE (CPS): 4000 NEAR COUNT RATE LOW SCALE (CPS): 0 NEAR COUNT RATE HIGH SCALE (CPS): 20000 TOOL STANDOFF (IN): LIS Tape Verification Listing Schlumberger Alaska Computing Center 9-0CT-1997 00:51 PAGE: 14 REMARKS: CORRELATED TO WESTERN ATLAS BHCA DATED 11/25/88 (MAIN PASS WELL TEST DATA FROM 8-27-97: GFR=l.55MBPD NOR=.63 MBOPD NW FGR=l.83 MMSCFD GOR=2891 SCF/STB LGR=2.97 ~SCFD TGOR=7597 SCF/STB TGLR=3096 SCF/BBL CHOKE=176 WATER CUT=59 DEVIATION IN AREA OF LOG WAS ALL 18 DEG. TAGGED TD AT 9352 FT MD. DID NOT HAVE A SUMP TO LOG INTO, SO DID NOT NORMALIZE SPIN TAGGED TD AT 9351 FT MD THIS FILE CONTAINS THE RAW DATA FROM PASS #1. $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 44 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 23 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 1102694 O0 000 O0 0 5 1 1 4 68 0000000000 NPHI PS1 PU 1102694 O0 000 O0 0 5 1 1 4 68 0000000000 RTNR PS1 1102694 O0 000 O0 0 5 1 1 4 68 0000000000 TNRA PS1 1102694 O0 000 O0 0 5 1 1 4 68 0000000000 RCNT PS1 CPS 1102694 O0 000 O0 0 5 1 1 4 68 0000000000 RCFT PS1 CPS 1102694 O0 000 O0 0 5 1 1 4 68 0000000000 CNTC PS1 CPS 1102694 O0 000 O0 0 5 1 1 4 68 0000000000 CFTC PS1 CPS 1102694 O0 000 O0 0 5 1 1 4 68 0000000000 GR PS1 GAPI 1102694 O0 000 O0 0 5 1 1 4 68 0000000000 LIS Tape Verification Listing Schlumberger Alaska Computing Center 9-0CT-1997 00:51 PAGE: 15 NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) TENS PS1 LB 1102694 O0 000 O0 0 5 1 1 4 68 0000000000 CCL PS1 V 1102694 O0 000 O0 0 5 1 1 4 68 0000000000 ** DATA ** DEPT. 9372 . 500 NPHI. PS1 19. 049 RTNR. PS1 3 . 419 TNRA. PS1 RCNT. PSI 4106. 537 RCFT. PS1 1200. 969 CNTC. PS1 4306. 263 CFTC. PS1 GR. PS1 26. 313 TENS. PSi 790. 000 CCL. PS1 O. 000 DEPT. 8938.000 NPHI.PS1 46.046 RTNR.PS1 6.000 TNRA.PS1 RCNT. PS1 2066.667 RCFT. PS1 329.718 CNTC. PS1 2127.226 CFTC. PSi GR.PS1 58.094 TENS.PSI 1290.000 CCL.PS1 0.000 3.625 1187.960 6.871 308.575 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .005 SERVICE : FLIC VERSION : O01CO1 DATE : 97/10/ 9 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE **** FILE HEADER **** FILE NAME : EDIT .006 SERVICE : FLIC VERSION : O01CO1 DATE : 97/10/ 9 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER 6 RAW CURVES Curves and log header data for each pass in separate files; raw background pass in iasc file PASS NUMBER: 2 DEPTH INCREMENT: 0.5000 FILE SUMFLARY VENDOR TOOL CODE START DEPTH STOP DEPTH LIS Tape Verification Listing Schlumberger Alaska Computing Center 9-0CT-1997 00:51 PAGE: 16 CNTD $ LOG HEADER DATA 9370.5 DATE LOGGED: SOFTWARE VERSION: TIME LOGGER ON BOTTOM: TD DRILLER (FT) : TD LOGGER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) LOGGING SPEED (FPHR): DEPTH CO~TfROL USED (YES/NO) : 8942.5 31 -AUG-97 CP 42.2 1738 31 -AUG-97 9352.0 9352.0 8940.0 9349.0 1800.0 NO TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER CNTD TELEMETRY MODULE ATM-AA 277 CNTD COLLAR LOCATOR CALU-B 1604 CNTD COMP. NEUTRON CNTD 1 O1 $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLERS CASING DEPTH (FT) : LOGGERS CASING DEPTH (FT) : BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE TEMPERATURE (DEGF) : BOTTOM HOLE TEMPERATURE (DEGF) : FLUID SALINITY (PPM) : FLUID LEVEL (FT) : FLUID RATE AT WELLHEAD (BPM) : WATER CUTS (PCT) : GAS~OIL RATIO: CHOKE (DEG) : NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): BLUELINE COUI~T RATE NORMALIZATION IN OIL ZONE TOP NORMALIZING WINDOW (FT) : BASE NORMALIZING WINDOW (FT) : 9003.0 SEA WATER/DIESEL/MET 140.0 239.5 BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (CPS): 0 FAR COUNT RATE HIGH SCALE (CPS): 4000 NEAR COUNT RATE LOW SCALE (CPS): 0 NEAR COUNT RATE HIGH SCALE (CPS): 20000 THERMAL SANDSTONE 2.65 LIS Tape Verification Listing Schlumberger Alaska Computing Center 9-0CT-1997 00:51 PAGE: 17 TOOL STANDOFF (IN): REMARKS: CORRELATED TO WESTERN ATLAS BHCA DATED 11/25/88 (MAIN PASS WELL TEST DATA FROM 8-27-97: GFR=l.55MBPD NOR=.63 MBOPD NW FGR=l.83 ~MSCFD GOR=2891 SCF/STB LGR=2.97 ~SCFD TGOR=7597 SCF/STB TGLR=3096 SCF/BBL CHOKE=176 WATER CUT=59 DEVIATION IN AREA OF LOG WAS ALL 18 DEG. TAGGED TD AT 9352 FT DID NOT HAVE A SUMP TO LOG INTO, SO DID NOT NORMALIZE SPIN TAGGED TD AT 9351 FT MD THIS FILE CONTAINS THE RAW DATA FROM PASS #2. $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE- 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 44 4 66 1 5 66 6 73 7 8 9 11 12 13 14 15 16 0 0.5 FT 23 65 68 65 66 68 66 0 65 FT 66 68 66 1 66 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELaM CODE (HEX) DEPT FT 1102694 O0 000 O0 0 6 1 1 4 68 0000000000 NPHI PS2 PU 1102694 O0 000 O0 0 6 1 1 4 68 0000000000 RTNR PS2 1102694 O0 000 O0 0 6 1 1 4 68 0000000000 TNRA PS2 1102694 O0 000 O0 0 6 1 1 4 68 0000000000 RCNTPS2 CPS 1102694 O0 000 O0 0 6 1 1 4 68 0000000000 RCFT PS2 CPS 1102694 O0 000 O0 0 6 i 1 4 68 0000000000 CNTC PS2 CPS 1102694 O0 000 O0 0 6 1 1 4 68 0000000000 CFTC PS2 CPS 1102694 O0 000 O0 0 6 1 1 4 68 0000000000 LIS Tape Verification Listing Schlumberger Alaska Computing Center 9-0CT-1997 00:51 PAGE: 18 NA~E SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) GR PS2 GAPI 1102694 O0 000 O0 0 6 1 1 4 68 0000000000 TENS PS2 LB 1102694 O0 000 O0 0 6 1 1 4 68 0000000000 CCL PS2 V 1102694 O0 000 O0 0 6 1 1 4 68 0000000000 ** DATA ** DEPT. 9370.500 NPHI.PS2 21.657 RTNR.PS2 3.750 TNRA.PS2 RCNT. PS2 4077.670 RCFT. PS2 1087.379 CNTC. PS2 4275.991 CFTC. PS2 GR.PS2 18.250 TENS.PS2 940.000 CCL.PS2 0.000 DEPT. 8942.500 NPHI.PS2 44.366 RTN-R.PS2 6.400 TNRA.PS2 RCNT. PS2 2285.714 RCFT. PS2 408.998 CNTC. PS2 2558.638 CFTC. PS2 GR.PS2 44.938 TENS.PS2 1315.000 CCL.PS2 0.000 3.975 1075.601 6.679 393.277 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .006 SERVICE : FLIC VERSION : O01CO1 DATE : 97/10/ 9 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .007 SERVICE : FLIC VERSION : O01CO1 DATE : 97/10/ 9 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE i~JMBER 7 RAW CURVES Curves and log header data for each pass in separate files; raw background pass in last file PASS NUMBER: 3 DEPTH INCREMENT: O . 5000 FILE S~Y LIS Tape Verification Listing Schlumberger Alaska Computing Center 9-0CT-1997 00:51 PAGE: 19 CNTD LOG HEADER DATA VENDOR TOOL CODE START DEPTH 9370.5 DATE LOGGED: SOFTWARE VERSION: TIME LOGGER ON BOTTOM: TD DRILLER (FT) : TD LOGGER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : LOGGING SPEED (FPHR) : DEPTH COITTROL USED (YES/NO) : TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE CNTD TELE~fETRY MODULE CNTD COLLAR LOCATOR CNTD COMP. NEUTRON $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN) DRILLERS CASING DEPTH (FT) LOGGERS CASING DEPTH (FT) BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE TEMPERATURE (DEGF) : BOTTOM HOLE TEMPERATURE (DEGF) : FLUID SALINITY (PPM) : FLUID LEVEL (FT) : FLUID RATE AT WELLHEAD (BPM): WATER CUTS (PCT) : GAS~OIL RATIO: CHOKE (DEG) : NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): STOP DEPTH 8943.5 31-AUG-97 CP 42.2 1738 31-AUG-97 9352.0 9352.0 8940.0 9349.0 1800.0 NO TOOL NUMBER ........... ATM-AA 277 CALU-B 1604 CNTD 1 O1 9003.0 SEA WATER/DIESEL/MET 140.0 239.5 THERMAL SANDSTONE 2.65 BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE TOP NORMALIZING WINDOW (FT): BASE NORMALIZING WINDOW (FT): BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (CPS): 0 FAR COUNT RATE HIGH SCALE (CPS): 4000 NEAR COUNT RATE LOW SCALE (CPS): 0 LIS Tape Verification Listing Schlumberger Alaska Computing Center 9-0CT-1997 00:51 PAGE: 2O NEAR COUNT RATE HIGH SCALE (CPS): TOOL STANDOFF (IN): 20000 REMARKS: CORREI~ATED TO WESTERN ATLAS BHCA DATED 11/25/88 (MAIN PASS WELL TEST DATA FROM 8-27-97: GFR=l.55MBPD NOR=.63 MBOPD NW FGR=l.83 ~4MSCFD GOR=2891 SCF/STB LGR=2.97 ~gfSCFD TGOR=7597 SCF/STB TGLR=3096 SCF/BBL CHOKE=176 WATER CUT=59 DEVIATION IN AREA OF LOG WAS ALL 18 DEG. TAGGED TD AT 9352 FT ~D. DID NOT HAVE A SUMP TO LOG INTO, SO DID NOT NORMALIZE SPIN TAGGED TD AT 9351 FT ~D THIS FILE CONTAINS THE RAW DATA FROM PASS #3. $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 44 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 23 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 1102694 O0 000 O0 0 7 1 1 4 68 0000000000 NPHI PS3 PU 1102694 O0 000 O0 0 7 1 1 4 68 0000000000 RTNR PS3 1102694 O0 000 O0 0 7 1 1 4 68 0000000000 TNRA PS3 1102694 O0 000 O0 0 7 1 1 4 68 0000000000 RCNT PS3 CPS 1102694 O0 000 O0 0 7 1 1 4 68 0000000000 RCFT PS3 CPS 1102694 O0 000 O0 0 7 1 1 4 68 0000000000 CNTC PS3 CPS 1102694 O0 000 O0 0 7 1 1 4 68 0000000000 LIS Tape Verification Listing Schlumberger Alaska Computing Center 9-0CT-1997 00:51 PAGE: 21 NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NU~B SAMP ELEM CODE (HEX) CFTC PS3 CPS 1102694 O0 000 O0 0 7 1 1 4 68 0000000000 GR PS3 GAPI 1102694 O0 000 O0 0 7 1 1 4 68 0000000000 TENS PS3 LB 1102694 O0 000 O0 0 7 1 1 4 68 0000000000 CCL PS3 V 1102694 O0 000 O0 0 7 1 1 4 68 0000000000 ** DATA ** DEPT. 9370.500 NPHI.PS3 20.910 RTNR.PS3 3.655 TNRA.PS3 RCNT. PS3 4208.437 RCFT. PS3 1151.365 CNTC. PS3 4413.117 CFTC. PS3 GR.PS3 26.953 TENS. PS3 1000.000 CCL.PS3 0.000 DEPT. 8943.000 NPHI.PS3 49.776 RTNR.PS3 6.941 TNRA.PS3 RCNT. PS3 1893.877 RCFT. PS3 272.545 CNTC. PS3 1962.197 CFTC. PS3 GR.PS3 41.844 TENS. PS3 1275.000 CCL.PS3 0.000 3.875 1138.894 7.299 276.553 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .007 SERVICE · FLIC VERSION · O01CO1 DATE : 97/10/ 9 MAX REC SIZE : ~024 FILE TYPE : LO LAST FILE : **** TAPE TRAILER **** SERVICE NAME : EDIT DATE : 97/10/ 9 ORIGIN : FLIC TAPE NAME : 97442 CONTINUATION # : 1 PREVIOUS TAPE : CO$4MENT : BP EXPLORATION (ALASKA), PRUDHOE BAY, W-18, API #50-029-21880-00 **** REEL TRAILER **** SERVICE NAME : EDIT DATE : 97/10/ 9 ORIGIN : FLIC REEL NAME : 97442 CONTINUATION # : PREVIOUS REEL : COGENT : BP EXPLORATION (ALASKA), PRUDHOE BAY, W-18, API #50-029-21880-00 ,.,../~ rßt/ to -I g' tí:uJh/ 7I6b .# '10/ / *.**************************** ~ . ~- ~ * ~L~S(A COMPUTING CENTER * ~ b ~ ~ **********************~*****~* *---~---------~--------~-----* *------- S~HLUMBERGER -------* *----------------------------* ****************'**~:****:c:.,****** '" '.:: "': CQMPANY ~AME : BP EXPLO~ATION I .JID';~ WELL NAM= : W-18 (41-21-11-12) ~ cI~LO NA~E : PRUQHO~ BAY . STATE : ALASKA . ~ ~OROUGH : NORTH SlOP~ ~ ~PI ~UMBER : 50-029-21830 , ..... ~EFERf~C~ N~ : 13200 ~ . .:~":d~ J'¡ ~ ... I ... ~ PII 1;:1 ~ a ,,./. P? , ~ ~ 's ~ ~ ~ , 1ST A" P E V :: R ! F ! C .~ T ~ 0 N L T S ~ ! ~: (; 2 3 - ~ A ~ -1 9 ~ 9 1 3 : :) 4 P A f~ = ~ 1 ILrllU~eERG~R ~LASK~ ~C~PU1ING C~~T~P **** R=~L hE~D~Q **** 5ERVIC~ Nã';~ ': E~IT . CATt ~ 39/03/23 U~IGI~ : FLIt k==l ~~~f : 7?~~~ C a ~ T I ~J U AT r 2 .'J '! : P~EVIüUS R~=l : ~C~~f~T : gp f~PlOQAT:Q~, 'PUD~O= 3AY, W-li (41-21-11-12), 5~-023-213PJ **** TA?~ Hf~D=R **** S~RVIC~ NA~~ : ~a!T CATE : 89/03/23 U~IGI~ : FL:C TAr~ ~~~E : 13:0J c :J ~ T I!,' U .!\ TIC !\j ~ . 1 p~=Vlnus íAPE : C 0 f.1 i'<1 '= :\1 T ~ :j p ~ '( P L (HU\ "r 'H' N. ;> Rue ~ c i=: :3 A 'f, W -1.a (41- 2 1 -11-1 2 ), ~ 0 - 0 2 '3 - 2 1 ~ 3 0 **** FIl~ ~EADER **** FILE ~~~E : EDIT .~Ol S~RvrCE ~ FLIC V~RSIQN : OOlA12 CATE : ~9/03/23 MAX RcC SIZE: 1096 FIL~ TYPE: LO L ,,"ST 'fIL~ : ******************************************************************************* ******************************$************************************************ ** ** ~~ ~. ~¥ ~¥ ** SCHLUM3FRG~R W~LL SERVIC~S ** *~ ~* ** ** *************~***************************************************************** *************************************~***************************************** COMPANY NAME: 8P EXPLORATION WEll : ;~- 1 8 (41,- 2 ! -11 -1 2 ) FIELD: ~RUD~D~ ~Ä! eORQUSH: ~GPT~ ~lOP~ STATE: AlASKÞ A?I NUM~F.R: SQ-029-218QO lOCATro~: 731.1 FiJL & 11H2' FEL SECTION: 21 TOWNSHIP: t1N RANG~: 12E .1 S T A? t V ~ R 1: ~ ! L ~, T 1 C !~ ~ 1ST I N G :? ~ - ~ n R - 1. <3 a 9 1 9 : Q 4 ~ A I'; E : 2 ItHLu,a~~G~R ~LASKð CO~?UT¡NS CENT~~ P~F~~~E~T D&TUM: ~SL ~L~V~T:CN: o. L !J G t.1:: A SUR := I) f Q :) '.r\ r ~ f:: 2 . 4 ! 3 G V f r:: ? .~ A \ t ~ T 0 ~ r IJ ~ ELEV~TIU~5 K3: ~2.4 C~: 82.4 GL: 52.j DAT~ LC;G¿Q: 1~-~~9-S~ T~ JRIL~~D: ~5~9. TQ La~G=R: ~502. C ~ SIN G 1: '~~ I !:! " 4 r L ~ ~ 0 ~ ! l L E R D ~ P T ~~ C F= 0 . T a 9!) 0 4 . C~SlNG l: 1h l~ LE i DR!lL~q D~PT~ c~ a7~6' TC 9550' TUBINS: ~ 1/2" 9.3 l~ ~ DQIlL~R ]CPTH Of O' TO E!77' e!T SII~ 1: :2 1/4U BIT SlZ~ l: a 1/2" ~ 9i~~. 1YP= rLU¡D IN ~JL~: P~ODUC=û ~LU:JS TIM t: L 0 ; (j t R C . J 3 f) r 1 1')!~ : 1. 2 : 3 0 1 '5 - ~., A ~ LOGGING DISTRICT: PRU~HQ~ EÞY laGGI~G ENGIM~~~: PDPT~~ klTNESS: p~~~ ~DcLH0VF~ T 'JUL NU ~.H3 fR 5 ~ C~l-UB 614 ATC-C~ 1153 C~C-DA 1~5 ATM-þ~ 283 ~S1?'-l A 3137 FItlD R'E:M',RJ<S: tJRR. TO W.A. ~~c S~N¡C 0= II/25/gS. ~~LL WAS SYUT-!N ~ 00:00 D4-~AR-39. SIW~D=110Q DSI @ 11:00. CPE~ ?eRFOR~TIONS: 92S8-9288, 9292-9311, 9320-9330, 9339-9344, AND 935~-33~4 lDGSeO ON SAN~STONE M4TRIX, CASED HalE. DAT~ JOS STARTEQ: 23-~ÞR-ßS JOB REFE~ENC~ Na: 73Z~O LOP/ANA: J. ~OH~ING ***********~*******************************************~*********************** ***** THIS QAT A H~S NOT BEf~ OEPT~ SHIfTED - OVERLAtS ~IELD PRINTS ***** ****************.******~*******************~*********************************** * ~: * * * * * * * * * * * * * * * * * * * * * * * * * * * * "" ... ~ ¥ * SCHlU~8~RGER lOGS INCLUDED WITH THIS cIlE <EDIT.OD1>: * * * * CGMPENSßTED NEUTR~N lOG - PASS ~1 (.PSi) * * FIRST TQ lAST R~AOING: 9498' TO 8987' * ~~ ~ ¥ . ~ * C1~PE~SdTEO NfUTRON lOG - PASS ~2 (.PS2) * .ts TA~f VEPIF1C~TlaN LISTING Z3-Mð~-13~~ li:04 PAGE: 3 i (; M llJ'" 3 I: ~~ G :: R ø. L ~ S!<, 1\ SO,'" P !J T I tJ ~ C ~ \I"r :: t:' ~: F'!R~l T1 lAST rH:Af)!",~G~ C?49~' Tû 8971:)1 * ..I. ~ ~. ~- * CU~~=NS~T~D N2UT~Q~ LOG - PASS #3 (.PS3) * * flRST ~Q L~5T R=A~ING: 9~9~' T~ 9988' * ~ ~ ~ ~ * CJ~?FNSAT~r N~UTRJN lGG - p~SS ~4 (.PS4) * * ~IR5T Tù LAST p~Aa:~G: 9490' TO 3955' * * * * ~~~! - ~r.JGES-L~~~A~ AV:R~r:=O C.HLA) *- t FIRST T~ lAST ~F.~SI~G: 949g' TO j9~O' * . ~ ~ ¥ * * * * * * * * * * ~ * * * * * * * * * * * * * * * * * * * T,!\BLE TYP= : CC\\J~ TUNI VßLU D~FI ---------------------------------------~----------------------------------------------~~---------~--- C~ fO cXPLaRAT!D~ CC~PANY NA~E F~ ~RUDH~E ~AY FT~LD ~A~~ WN W-19 (41-21-11-12) ~ELL NAM~ NATI usn HAT!~N ~TA! ALASKA STATE JR P~QVINC= COUN NORTH SLOPE COU~TY FL 731' FNl f.. 11Q2' :=;:L FI=LD lDCAT!O~J SECT 21 SE~TIO~ TOWN I1N TOWNSHIP RANb 1~f. RA.NGE l~TI lATITUDF LONG LONGITUOE E~G! paRTER ~NGINEER'S NAME saN 347121 SERVICE ORDER NUMEER APIN 50-029-21880 API SEP.I4L NUM8ER ----------~----~~-----~-~---------~--------_._----------------_._------~----_._-------------~--------~-- TABL~ TYP~ : cu~v DêFI ----------~--~-~-~-------~~------------~--~---~------------ DEPT ~EPTH C~~NNF.L NA~E NPHI NEUTRON POROSITY TENS Tf:NSION NPH! NEUTRON PURCSI'TY ~RAT NEUTRON ~ATIn (NC/~D) NCNL NEAR CNl D~TEcrOR CQUN1S fCNL FAR CNl 1fTECTQR C1UNTS RNRA PAW ~EUT~O~ RATIO {N~ÞR/~AR) eCL eCl AMPLITUDE GR ~AMMA RAY TENS TENS!O"J NPHI ~~UT~ON PO~OSITY NRAT NEUTRDN qÞTID (ND/FD) I ~ T,t\ Þ = \I;: R I FIC.~ T r~) N lIS T !~: G 2 3- 'Hi R - 13 ~ 9 1 j : :) 4 ::t AGE: 4 ,lHLU~~~qG~R ~LASKI CC~PUT¡~G C~~1~~ O~F!: ---.-------------------------------------------------------- N C N L to! E. ~ 1 C \ L 0::":: c r ~ p. C C U"..i T S fCNL FAR :~L JETE~TJ~ CJU~~~ R "-I R .~ !~ A ',-I ~: ~ u T ~ !J ~~ ~~ ß T 1::: ( N ~ ð, R I F L\ ;, ) eCl eCl A~~l!T~D~ G R :; t\ '., M A .~ A Y T f.: N S i E: '.1 5 : U N NPHI ~~U1~U~ DG~OsIrY . NRAT ~FUT~C~ ~ATIJ (~~/~L) NCNl N~A~ C~l r=T~cTaR CCUNTS fCNL '=~,~ C~L !)~TcCT:)~ C JU~!TS R~R~ ~AW ~EUT~U~ RArrc C~Et~/~A~) tCL eCl ~~PL!TU~~ GR GA~M~ ~f..Y r t ~~ S T E \ S ! Q ~! NPHI ~~UT~D~ ?r~~S¡TY NP'þ"f ~!EUT~~')\J P,~TI[) (~,)/=r) NCNL NE~~ C~L C~T~CT~~ GCU~TS fCNl FA'~ C~l DfT~CTnR C~UNTS R ~ R,~ ~ Þ W ~~ E U T ~ 0 N P. A r I J (~, ~ ~ t\ I F A ~) eel tCL AMPlI1UDE G R GA'" If!1 .~ ~ y -------~---------------------~----------------------------- ** DAT~ fOR~AT SPtCIFIC~TICN RECORD *~ ** S~T 1YPE - 64£B ** ~-----------------------_._---- rVDf. p=p~ coDe VALU~ -.----------------------------- 1 56 1) 2 66 f) '3 73 1,36 4 ~6 1 5 66 6 73 7 65 R be ~.5 9 ~5 ~T 11 66 ß 1 2 ~8 13 66 0 14 6~ ~T 15 66 ~R 1~ 66 1 0 ~~ 0 ---------------------~-------- ,IS TAÞ~ V~RI~IC~T!ON L!STINS ~3-~AR-l~g~ Id:04 P t\ I'; f.:: ~ ¡LHLU~3EqG~~ AL~S~~ CC~P~T!NG CfNT~~ ** S~~ TYPE - CHA~ ** --------------------------------------------------------------------~------------ I\. l\ ~::: s ~ ~ V U ',! I T :)ëQV rc~' .11 PI ~p I "-"I AP! FILE NUM~ ~UM8 srz~ ~E?~ P~CCF'5S I ~J '1C:::':-~ '. L'JG TypF CLA,SS ~~ ~ n ,'~ U 'Ht S .4,.1 P :: L :: to' CO"]::: (H~X) . ------.----------------.---------------------------------.-------------------------- C::~T ~; 347121 0 'J OOC ca C 1 1 1 4 63 0000001000 f'..iP~l I1L.\ PLI ~L. ri ¿1 "n OOt} "" C 1 1 ' 4 é3 JCOOOo~O~t; ,",' oJ .. ... ,¡, - TE:NS ;JSl l '::: :141121 00 ~O t) 01) ~ 1 1 1 -+ 6j OOJoaO:JOoo NP~I ?Sl PU 34"1121 l'Q OOt) Q':} I) 1 1 1 4 6~ OOOCOOOOryO N~AT °S1 :'41121 OJ 00:; oa 0 1 ., 1 -+ ~3 OO~aJOOf)aO ,¡, t-4CNL PS1. C PS 341121 0') OO'J 0' Q 1 1 1 t... 68 00001)1)1)000 fCt\¡L PSI C PS .~¿1121 O~ 000 00 0 1 1 . 4 63 00::>0':>00000 ,.I. .r.. R~RA PSi 3471~1 00 O!)') O~ ~ 1 1 1 4 63 OOOOQo,)oao eCl ¡J s 1 3471.21 00 000 0') 'J 1 1 1 4 63 000000')000 G~ PSl Gt\P! 3411.~l O~ DO 0 00 Q 1 ., 1 ~ 69 0000000000 .. T :;!I~ S P S 2 L?, ~41121 (11] OOC 00 {) 1 1 1 4 6~ OOOOOO')OOQ t\.?HI PS2 ?U 341121 00 000 OJ (\ 1 1 1 4 69 aoooaODOOO NRAT PS2 ~,47121 01) ~o ') 00 0 1 1 1 4 6B OOOOQO~OOC NCNL PS2 CPS 341121 00 000 00 0 1 ' 1 4 63 OQ'JQOD'JOOO .... t-CNl PS2 C?S 3'.7121 00 000 Ory 0 ] 1 1 .. ~8 oocaoooo~o RNRÞ, PS2 '~47121 O~ 000 01) 0 1 1 1 4 68 0000':>00000 eCl PSi. ~i41121 00 000 O~ 0 1 , 1 l,. 63 0000000000 .... ... üR 1'52 GAPI 347121 Of) DO 0 Cry 0 1 1 1 4 68 OQOOQOQOOO TENS PS3 L:, 34'1121 00 000 00 0 1 1 1 .... 68 oooOOOOOûD NPtiI PS3 t'ltJ ~411Z1 00 oca 0:) 0 1 .1 1 4 68 0000000000 NRAT .JS3 3 4 '11 2 1 00 000 00 0 .1 1 1 4 68 oooo~ooooo NCNl PS3 CPS 341121 00 000 00 0 1 '1 1 it 6q OO,OOCOOOO FCNl PS3 (?S 3471,21 00 000 00 0 1 1 1 4 6B 0000000000 RNRA PS3 347121 00 000 00 0 . 1 1 4 63 00(0001)000 J. eCL PS3 347121 00 000 00 0 1 1 1 4 68 OOOOQOJOIJO GR "53 G~PI 341121 00 ~oo 00 0 1 1 1 4 68 0000000000 TENS PS4 LS 347121 00 ao\) 00 0 1. ... 1 4 68 0000000000 ... N?HI PS4 PU 347121 00 000 00 0 1 1 1 4 68 OOOOOOIJOOO ft,fRAT PS4 341121 OJ OOD 00 0 1 1 1 4 68 oo~ooooooo NCNl PS4 CPS .347121 00 000 oc 0 1 1 1 4 68 0000000000 FCNl ~S4 C oS 347121 00 000 00 0 1 1 1 4 68 OO~OOOOODO RNRA PS4 341121. 00 000 OF) 0 1 1 1 4 63 0000000000 eCl PS4 34712.1 O~ DOD 00 0 1 1 1 4 6B 0000000000 GR PS4 G~F'! 341.121 CO 000 00 0 1 1 1 4 68 00000000"'0 -------~----~--_._-------------~-------~---~-------~--~---~------~----~-~--------- ~,¡... D,~T A .a.oh ""'..,.. .......~ UEPT. 9~32.000 ~PHI.Hl,a 2~.980 TENS.PSl -999.250 NPHI.PSl -999.2.50 NRAT.?Sl -9~9.250 NCNt.PSl -999.250 FCNL.PSl -':J~9.Z50 RNRA.?S¡ '-999.2.50 eCl.PSi -999.250 'GR.PSl -999.2.50 TE~S.PS2 -993.250 NPH!.?S2 -939.250 NRAT.PS2 -~99.250 NCNL.PS2 -399.'250 'S:CNL.PS2 ,-99Q.250 RNR,\~. PS 2 -999..250 CCL.?S2 -99Cj.2;0 f,R.PS2 -'~99.250 TENS.PS3 -9f£t9.2~!) NPHI.PS3 -999.250 N~AT.PS'3 --99'9.250 NCNL.PS3 -qq9.~50 FCNl.PS'3 -'399.230 RNRA.PS3 -999.250 CtL.PS3 -999.250 GR.PS.3 -993.250 TENS.PS4 '1B5.000 NPH!.PS4 29.980 NRAJ.PS4. 5,.043 NCNL.PS4 ~D99.000 fCNL.PS4 ~58.S00 R~~R,A. PS4 4.703 Ct:L.PS4 0.000 GR.PS4 2~.14.l 1 S . T A"P t: V t R If!. C !11 : U N L I 5 TIN '; 2 ~ - 'H\ ? - ] 9 i 9 1 g: !j 4 °AbE: 6 L H L U M.3 I: R G ': R ß LAS K t\. -:: [] '1 PUT ~ N S 1"; :: ~ ~ T :: R r'=PT. S500.0aC :'J P }.. I . t! L A 2?1.92 T F ~J S . P S 1 1355.()0l) ~cHI.PSl ~9.8a3 N;::'AT.oSl 5.0~1 t~ ( N l . P S 1 31~4.~OQ :=CNL.PSl SS3.50a R~R".?Sl 4.746 ~CL.tJSl 0.000 GR.P51 ld.57q T=~S.PS2 1331).1)00 NtJH!.PS2 29.443 "':~,QT. !'SZ L..911 !I'J C \J L . ø S 2 2.)&i)..101 C:CI\JL.PSZ 537.30J R~P'~\.PS2 4.613 ,:CL.PS2 0.0:0 SR.PS2 19.155 TF.Þ.JS.P53 1260.')01) NPHI.?S3 30.018 NRAT.~S.! 5.0':,1:; \¡C~1l.P53 3170.001 =C~'JL.PS3 ~70.'JOO RNf\~.PS3 4.730 CCL.PS3 0.000 GR.PS3 2~.?~4 T~NS.PS4 12~O.jc.a N"HI.PS4 30.322 NRAT.PS4 5.03i' ~J C :-J l . P S 4 2-CJ2.,)O~ Fe 'I L . P S 4 6'37.00C R'1R.l\. PS.. 4.239 CCl.P:S4 0.000 SP..,S6. 2S.'.03 GEPT. 9400.000 ~I P ~ I . r L A 20.801 T~NS.PSl 1160.tJOG ~~?H:.PSl 23.047 NRAT.PSl 4 . 1 .5 4 ~J C 'I L . P 5 1 ?502.10J FC~L.PSl ~8~.OC~ R~~I\.PSl 3.951 CCL.?~l O.OOf) :;P..PSl 12.109 TE\iS.PS? 1131.000 NPMI.PS2 21.045 NRAT.PS2 3.~9-; \J(\JL.~S2 ~332.\)l'O i=CNL.oS2 900.')00 RI\JR~..PS2 3.701 CCL.DSl O.O~JQ .';r.PS2 lS.703 TENS.PS3 111.;.lJr-O N?HI.PS3 ,20.166 NRAT.PS3 ~.711 !~C ~ L . P S:3 3 rJ;',f}. DO~ =CNL.PS3 986.:)00 RNRA.PS3 3.102 ClL.P:S3 0.000 .";R.P53 15."'34 Tf:NS.PS4 1105.000 ~p~I.DS4 20.654 NRAT.?S4 3.0.45 NC:~l.PS4 3330.000 FC'~l.a54 919.5QO P.NRa..D$4 3.621 CCl.'fJS4 0.000 GR.PS4 19.515 DEPT. 1).300.0'.)0 NP '.r:: .~LA 2~.!t39 TENS.P.s~ 113.').00') NP~I.'?Sl 23.145 NRAT.PSl 4.1TS \JC"'Jl.P31 4300.000 FCNL.PSl 1100.000 R'\JRA.P$l 3.908 eCl.PSI 0.000 GR.PSl le.765 TENS.PS2 1120.000 N!'Hr.t)S2 2'3.3.57 NRA"T.tJS2 4.S9~ QCNl.PS2 4352.000 ~CNL.PS2 1089.000 RNRA.PSZ 4.000 CCL.PS2 0..000 GR,.P,Z 1,5.953 TE'~S.PS3 1110.000 ~PHI.PS3 25.195 NRAT.PS3 4.445 ~JCtJL. PS3 4488.-000 FC"Jl.PS3 1083.000 RNRA.PS3 4.125 CCL.?S3 O.OQO GR,.PS3 18.766 TENS.P.s4 1115.000 NPH!.~S4 25.586 NRAT.PS4 4.416 ,'JC ~JL .? 54 4'780.aOO ~C!\IL.PS4 1075.000 RN~A..PS4 4.255 eCL. ?~,4 0.000 ~R.P)4 .21.439 DEPT. '3200.000 NPHI.HlA 30.213 'TENS.PSt 1115.000 NPHI.!>Sl 25.098 N¡<AT.PSl 4.430 ~C.NL.PSl 4.3 R 4. 0 o'~ !=CNl.PSl 1105.GOO RNR.".PSl 3.961 CCL.PSl 0.000 GR.PSl 31.594 "TE~S,.PS2 1110.000 NPH.I.~)Z 30.556 N'~AT.PSZ 5.109 NC~L.PS2 4500.000 ~CNL.PSZ 383.tJOO Ri~P.A.?Sl 4.514 CCl.PS2 0.000 GR.PS2 37.4~8 TENS.PS3 11.05.000 NP'HI. PS3 29.136 NRAT.~S3 .~.O12 NCNL.PS3 4',24.000 fCNL.PS3 ,863.!'JOO P.~R.A. PS3 5.211 CCL.PS3 0.000 GR.PS3 31.969 TE~JS.Þ.s4 1115.1)00 ~?HI.PS4 30.213 NRAT.?S4 5.0"74 "'IC NL. P $4 4S80.000 FCNL.PS4 8~5.-o00 R:-.JRA.PS4 5.112 CCl.PS4 0.000 SR.PS4 42. ,281 DfPT. -;100.000 NPHI.HlA 23..:J2'3 TENS.PSI 1~10.000 N~H:I.:P S.1 23.81'1 NRAT.PSl 4.213 NC~L.PSl 3966.00J FC,Þ.JL.PSl 1~16.500 RNR,'\.PSl ,3.900 eCL.PSl 0.000 G~,.P~l 132.625 TENS.P'Sl 1105.000 NPH'I.PS2 24.170 N~AT.PS2 4.313 1>.JCNL.PS2 4l8~.OOO FCNL.PS2 1021.fJOO R~RA.?S2 4.199 'CCL.PSZ 0,.000 GR.PS2 145.~OO 'TENS.PS3 10.90.000 NPH!.?53 23.242 NRA"!.PS3 1t..1Ql \'J C N L . P S:3 4400.000 FCt~l.PS3 1100.i)OO RNR.~. PS 3 4.000 CCL."S3 0.000 GR.PS3 152.625 TENS.PS4 1090.000 NPH1.PS4 23.4815 Nì<AT.P54 4.2,23 NCt..Il.PS4 4336.000 FCNl.PS4 1093.000 RNR~.PS4 3..967 CCl.PS4 0.000 GR.PS4 162.125 DEPT. '3000.000 NPH'!.HLA 53.~55 'TfNS.PSl 1070.000 NPH.I.PSl 56.54~ NRAT.PSl 8.070 NCNl.PSl 1 ~66.000 FC~L.PSl 266.500 RNR.e,.PSl 1.000 eCl.PSl G.DOO GR.PSl 44.750 TENS.PS2 ID85.000 NPHI.?S2 53.51~ NRß'T.tlS2 1.727 NC'JL.P$2 183,3.000 ~CNL.PS2 26';. '500 RNR,4,. PS2 6.8'15 ,I'S TAPE V::: R If Ie AT I 0 ~'J LIS T ¡ ~,I r; 23-~tq-lga9 1~:~4 pø:;F.;: 7 iC:HLUM~tPG~R ,4l,Q '5 ~ A C Q .... P 1.1 r '! ~ G c: :- \! T t:; R CCL.~S2 0 . 0 ') Q ~R.P52 ?1.5)13 T~~S.PS3 1085.0C') N~'"!!.?S3 52.686 f\RAT.PS3 7.533 !\J( 'Jl. P 53 2103.-:>00 ~CNL.PS~. .306.I}Oa R~JR,i\.t)S3 5.837 CCL.iJS3 0.01)0 :;R.t'::3 '+2.313 TENS.!'54 1075.000 ~P"':.P54 54.R93 I\J~Ar.?S4 7.ts9~ '~ C f\J L . P ) 4 2,140. aon '=CNL.PS4 28'1. 'lC.) "~R~.ØS4 7.059 CCL.~:S4 c.ooo ~R.PS4 '~1.'163 D=PT. 3C::;¿4.~OO NÞH!.hl~ ~7.119 T E t.~ S . p S 1 -999.250 N?HI.¡JSl -q~9.250 f\~AT.PSl -1:J"9.2~~O ~,I C "1 L . P") 1 -199.2S~ ,=CNL.PSl -'399.250 R~~P~.PSl -9'~9 .250 eCl.PS! -9q~.250 ~R.PSl -~q~.151 T=t.JS.psz -999.250 ~JDH¡.:PSZ -999.2,50 NR.cT.P~2 -9-:'~9.2~O ~JC~4L.PS2 -'399.l~J ~C~L.PS2 -9'39.2~O R"Jr:~~.?S2 -999.250 CCl.?S2 -9~9.2':'\O "P.PS2 -:l~~.'~50 TE,.~S.PS3 -993.250 N?H!.PS3 -939.250 NRAT.PS~ -999.2~O NCNL.PS3 -993.250 ~C'JL.PS3 -9~9.2SJ RN~A.PS3 -Q99.250 CCL.~S3 -999.2-50 ~;P.F"5~ -9~'3. ~51) TENS.PS4 1010.~O!) N?~r.PS4 51.178 f\:~AT.~S4 P..148 ~! C ~J L . P S 4 211,';.000 C:CNL.PS4 295.')0:> iHJRA.PS4 1.172 CCL.PS4 0.0')0 GP.P,4 36.433 ...,J.o t:ND OF DATÞ oJ.... 'f"¥' ,.... """"ww ~Il~ fRAILER ...... .",.~..... .... ~.......... ","'.1'."'",,,,,,,,, FIL1:: NAME ~ '::D IT .QOl ~ERV.ICt .. Clr( . VERSION . OD1;\02 .. DATt: . ~9/0;'/23 .. MAX Ri:C SIlE . 10~~ .. fILE TYPE .: LO LAST fILE . .. ... w .....~ T~P'E TP,1Ilr.~ ~o~* * .... ... .... ¥' SERVICE N,!1t:¡: . ';: D I T . DATe . 89/03/2.3 . ORIGI~ . ~lIe . TAPE NAME : 73201 CONTINU,t\T ION '~ : 1 PREVIOUS TAP~ . .. CO~MENT : gp EXPLORATION, PRUD:10'~ gAY, W-!~ (41-21-11-12), 50-029-21~80 ....a........ R=ŒL lRAILE'R 'III" ~ J...J. "\,,.....~....,.. 'life ,,-....... ".'" SERVICE NA~'E : EDIT DA T'E . 89/0.3/.23 . OQrGIN .. FlIC . R:EL NA~1t : 1310r) CON T! N U AT .I D ~J 13: : P'REVIOUS RE~L . . COMr"lENT . 'gø fXPlORATION, PRUDHOE BAY, W-lS (41-21-11-12), 50-029-21::180 . PROGRAM: LiSCAN REVISION: 5.1 PART NUMBER -' W5790-PE52 Start of execution: Thu I DEC 88 5:22a **** RE=L LIS' 85/11/25 ATLAS 01 HEADER **** LIS CUSTOMER LIBRARY TAPE RECEIVED * TAP: IS 8/11/25 3611 01 HEADER **** DIFL, BHC, CN/GR POR. RAW DATa: M~IN 6 REP=AT, CHCF~ FIL:_ .~ 1 **** FILE HEAD=R. .. **** MAIN .001 102~ CN : STANDARD ALASKA PROD. WN : W-18(41-21-11-12) FN : PRUDHOE BAY COUN : NO~TH SLOP£ STAT : ALASKA CO FORMAT RECORD (TYPE# 64) ,ONE DEDTH PER FRAME TAPF DEPTH UNIT : CT 15 CURVES : NAME CODE SAMPLE# UNIT 1 CILD 58 1 MMMO 2 SP .5.8 t MV 3 CS~N~ 68 I ~TS ~,YTES 4 4 4 6, CHT 68 1 LB 7 TTEN 68 1 LB 8 SPD 68 I FINN 0 AC 68 1 US/F I RFOC 68 I OHMM ~ RILM 68 1 OHMN S RZLD 68 1 OHMM 4 CN 65 1 PCT 5 CNC 68 I PCT * D4T~ RECORD DEPTH Gq AC CNC 9575.000 47 Q748~ 70.08673 lO.00000 9525.000 47.87485 70.©6432 29.03831 9475.000 32.11014 83.62294 24.04556 9425.000 25,18326 75.3344? 21.14310 9375.000 30.03936 71.34!84 18.38170 ~325.000 29.46547 84,4026~ 25 ~458~ 9275.000 20.05595 25.05768 9225.000 32.07005 86.41418 23.93610 9175.000 53.60228 86.19962 (TYPE# CILD ~HT RFOC 510.5869 222.3294 3.608042 154.0523 838.5981 51731335 490.0527 845.4189 4.490031 373.8720 830.3572 6.409945 143,2929 840.2434 8.795256 71.74~10 848.6225 16.06288 =4 9588~ 82o,7271 16.05765 72.62123 79g.7466 t~.2t5t4 77.1m862 887.2043 t9.45717 0) 966 BYTES * SP TTEN R!LM -67.,5926 2950.905 t.666960 3,983372 4144.6~8 6.55'7366 -66.5~55G 4142.301 2.0~1704 -63.26465 41t3,863 2,931602 -52.05061 ~113.914 7.116730 -64.52226 4087. 076 10.45010 -=o 9440P 407~,B46 12.96~05 -55· ~,~2602 4020.625 10,55775 -37.07454 4175.758 12.22427 CSSN SPD RILD 281.9717 22.99770 I .924605 281.9717 23,99762 6.491303 278.0234 24.23341 2.040597 325.1262 24.46471 2.674708 362.8570 24,991~1 6.978710 288.6750 24,73062 13.e3,R02 278.2732 24.99751 1~.19542 287.7015 24.4~440 !3.77008 278.8503 24.10681 12.95300 CLSN ~C,~ CN 90.99001 O.O000000 15.00000 90.99091 O.O00000O 25.03331 103.9235 0.0go0000 20.04556 132. 3266 0. 0000000 17.14310 164.0945 O.O00000O 14.38170 103.8247 0.0000000 21.145~0 100.2397 O.O0000CO 21.05768 107.8111 0.0000000 19.93619 101.7616 0.0000000 20.7576~ ~1-25..000 8.155430 -1.22.3086 74. 29242 901. 5669 4t 43. 684 56.51 503 2,53. 5090 4~. 061 69 7'. 4.1 478,8 9075 · 000 55. 09073 I 3,. 84'7'86 118 r~09 :~45 '7798 4n57,~ .937 88.74385 2~.67Z87 1 6.31444 27.64304 535.0574 24./-.,0381 122.6177 ?85.6833 17.574.91 18.15187 90~5.000 69. 27866 -6/4. 51862. 313.3257 7! . 65,'3,35 ,854. 273/-+ 4030.8/--,0 I 4 . 58020 87.3033% 1 3. 86811 11 · S2598 I 4.4.344§ 1 9. 49080 433.9199 0.00,30000 3.4.147B8 O5.8674.0 0.0000000 23.64304 1~6.5849 0.0000000 15.49080 8975 · 000 I 35. 3427 8. 2951 70 1 39. 8554. 27. 68871 74.1 9804 845. ~1 89 40~.6.596 1 4 · 99850 O. 0000000 55.~5074 0....,,_~'P7214.5 10000. O0 7.~653~, 56.54z64~ 6~ 5436~ TOTAL D&TA RECORDS : 87 STARTING TAPE DEPTH = 9575.00 **** FILE TRAILER **** ENDING T~PE DEPTH 8927.00 FILc # 2 **** FILE HE~DER **** REPT .OOZ 1024. FORMAT RECORD (TYPE# 64) ONE DEPTH PER =RA,ME TAPE DEPTH UNIT : FT 1S CURVES : N.&ME CODE SAMPLE# UNIT 1 CILD 68 1 MMHO ~ S~ 68 1 NV 3 CSSN ~8 1 CTS 4 CLSN 68 I CTS ~ GR 68 1 AP1 8 CHT 68 1 LB 7 TT~N 65 I LB 8 SPD 65 1 F/MM 9 AC~ 6~ 1 10 AC ~8 1 US/= 11 R~OC ~8 1 OHMM 12 ~ZLM ~8 1 OHMM 13 RILD 68 1 OHMM 14 CN 6:5 1 ~CT 1~ CNG 6~ 1 PCT ~'~YT ES 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 DEPTH CNC ~576.000 38.29087 60.91489 1.o.00000 9526.000 38,29987 6¢.o4470 25.47217 9476.000 28.84276 84,72791 25,02634 9426.000 26.01888, 76.35846 19.46330 9376.000 27.18138 70.04L1 0 I 5. 4653~ 9326.000 30.588~7 84.19786 22,90155 9276.000 32,09131 87.55054 27.05~77 32..75479 $2.74382 23.76109 91 76. 000 28.43g$0 88,~9072 21.17711 9176.000 74.62785 55.6.0200 7.71434~ 9076.000 104.1861 83.07205 24.32443 9026.000 69.92198 85,48717 CILD CHT RFOC 514.6Bgo 77.63x~~' 3.672170 150.9507 726.0603 5.765889 515.9160 729.4160 L.384191 377.4094 744.6736 6.258~50 132.42.26 753,3105 I 2. 30852 83.04616 776,5068 15.84~14 57.48392 785.1 875 17.48344 70.95175 7~1.4246 15.35569 ~4,362t ! 856.3877 1~, 27838 13.94202 894.0269 140.7851 68.!6530 845.6804 ~ 6 9 n .. . ,..,527 70.43900 853,0498 !4.!9773 SP TTEN RILM -64.53154 29t4.309 1.660222 t 2.68~05 4072.510 7.181478 -59.26471 4092.402 2.015975 -57.90102 4050.680 2,886713 -49.69174 4029.565 7,210277 -56.18015 4078.399 8.998768 -53.66988 4030.127 11.89576 -52.01750 4000.872 11.71795 -36.45338 4106.527 12.26!94 1.671706 4113 00: 44.66240 15.53650 4013.347 13.32056 -60.,8291 5 4051 .o57 11 .91121 CSSN SPO RZLD 268.Q731 24,99751 1.eo5891 2~8.9731 24.34743 6.62441~ 274.6641 24,9~75! 1.938300 306.3752 24 9~7~1 2.64~642 349.7908 24.99751 7.551579 274.7988 24.9~751 12.04150 271 .6157 2L.99751 17.39616 287,2402 25.99140 14,09408 ~95.8472 25.88820 15.53709 531.6704 22.9,0181 71.72560 298.4597 23.00360 14.67021 323.1125 15.9Q840 14.19668 CLSN ACQ CN 95.9o043 O.O000000 15.00000 95.99040 O.OCO0000 21.47!17 99.40993 O.O000000 21.02634 134,1495 0.0000000 15,46331 179.87o3 0.0000000 11.46538 106.6148 0. 0000000 18.90155 91.82481 0.0000000 23.05672 108.3367 O.O00OO00 19.70109 122.0138 O.O00000O 17,17711 419.7227 0.0009000 3.714343 110,S304 O.O00000O 20.32443 130.3466 0.0000000 15.65485 9'76.0 00 79.24806 66.56952 60.33122 169.6024 867.8782 0.7024218 t7.07829 4085.392 10000.00 140.2~35 1 5. 99840 5. 8961 44 27.85143 O.O0000CO 56.33122 TOTAL DATA RECORDS : STARTING TAPE DEPTH = FILE TRAILER **** 87 9576.00 UD I NG TAPE DEPTH 8928.00 tILE ~ 3 CHCN ,0~? **** FILE HEADER **** 1024 FORMAT ONE DEP TAPE DE RECORD (TYPE~ 64) TH PER FRAME OTH UNIT : FT 15 CURVES : NAME ! CILD ? SP 3 CSSN z+ CLSN 5 GR 6 CHT 7 TTEN 8 SPD 9 ACQ 10 11 RFOC 12 RiLM 13 RILD 14 CN 15 CNC CODE SAMPLE# UNIT 68 I MMMO 68 1 MV 68 I CTS 68 1 CTS 58 1 ~PI 68 1 LB 68 I LB ^~ 1 F/MM 68 1 68 I US/~ 63 I OHMM 68 1 OHMM 66 I OHMM 63 1 PCT 68 1 PCT 3YTES 4 4 4 4 4 4 4 4 4 4 4 4 4 * DAT~ RECORD DEPTH GR AC CNC g054,000 1~5.5102 99.11508 19,00000 9004. 000 165.5102 (TYPE# O) C!LD CHT RFOC 499.1396 856,7505 1.999352 496. 701 2 ¢0'~ 1 ~11 966 5YTES * SP TTEN RILM -3.293673 4060.993 2,010200 -4.785096 4105.168 CSSN SPD RILD 125.9873 39.9~599 2.003448 125.9;d73 52.31711 CLSN A C ,~ CN '~ · . im ,3.000000O 15.00000 21 .997g0 0.0000000 89 7 9 6 $9 7 54. 000 5.72137 9.!1505 3.29074 7,77602 99.11508 59.01700 854.000 64.51328 99,11508 44.0885~J 804.000 70.51901 9¢'). !1533 55.1256! 8754,000 73.58853 99.11508 53,27592 8704.000 63,09010 99.1150~ 38.50504 654.000 50.23053 99,11508 42.06265 604.000 53.69170 99.11508 37.05552 554.000 56.31314 99.11508 40.52957 594.000 63. ~5480 9° . 11508 41 ?696 454.000 73,98627 99,11508 59.07067 404.000 79.34811 99.1!505 70.84793 ~54 000 75.40133 99.11505 546.4521 890.6936 1,801634 546.5183 ,,R, 83.5608 1 8046 z~, 546.8867 ~77 ~242 ~.~ · m ~ . . 1.8.25427 546.7192 8~8.1409 ! ~7 ~91 n 8'~0 2842 1.821074 546.6599 860. 4343 1 .F354026 547.2937 877.1953 1 . ~2~+980 548 "'76 4~1 7 I .8t4300 54 ~ o.~667 862 48~ 1,99541 5 548.3962 872.3660 1.8tcq9t0 545.901 2 867.9783 1.84!660 547.1328 879.0330 m ~ 548.1145 .~64. 4404 2 39n684 19.74339 4069.261 1.84692t 28.35774 4042 75? 1.846621 32355 4002.9~7 . ($47773 29.24440 4r"'37, t 6~ 8471 93 3~.10207 3989.097 1.R44333 29.04131 3936.8~7 1.84570£ 28.05991 3°,96 406 1 .848005 27.99718 3852.062 1.843852 22.23138 3855.473 1.842085 26.t5201 3850.174 I .~3073 24.7751.'5, 3704 2 ~7 1 .843718 20.94968 ~795 5o3 1 · ~961 96 31 ,4941 ~ 3741,316 1 .941025 140.1942 54.06810 I . 829c~87 142.7332 55.02431 1.~29765 170.8464 55.20651 1.~28532 144.9115 54.99451 1 ~909~~ 154.1 878 55.51 790 I .826514 169.3045 55.87372 1.829291 170.7586 55.23032 1.827172 1 65.41 ~.0 55.58821 I .324709 171.085,~ 55.96460 1.822600 1o9.9190 55.00041 1.823499 141.1659 55.98851 1.631532 142.4098 55.99442 1 .827710 143.2533 56.02420 1.324436 27.20076 0.0000000 59.29074 2B.50291 0,0000000 55.0275"'J 41.~6336 0.0000000 40 n 30.46727 0.9000090 51.12561 32.94937 0.0000000 49.2'7597 44.41705 0.0000000 34.50504 41.69189 0.0000000 38.06265 44.15619 O.OOOOOO0 33.95551 43.27499 0.0000000 36.52957 42.'15~56 0.0000000 37.76970 78.4'7169 O.O000000 55.07062 26.32919 O. O000OO0 66. :34793 2~.00073 0.0000000 54.45940 ~3'04.000 548. 8904 30.17744 143. 4987 26 · 92351 67. 88757 858. 2239 ..5747. 333 55 · 62390 O. O000GO0 99.11 50~ 1 .940894 1 .8431 72 1 . 821 857 ~5. 30972 69.30972 8254.000 547.3704 29.69814 163.6062 39.18423 60.07034 $74.4565 3752.628 55.98851 0.0000000 99.11508 2.076337 1.843236 1.826917 40.05540 44.05540 8204.000 548.0015 22.21500 165.2688 38.05125 60.095~S 8Z~9.4639 3684.42~ 56.85530 0.0000000 99.t150B 1.847884 1.8~3950 1.824813 42.20637 45.29637 8t54,000 548.1345 9.770489 178.5842 47.4,3250 4~.~4555 848 .9656 3656. 594 _,~7 .6474'~.. O. 0000000 9°.11508 1 .869472 1.844194 1.824369 33.62572 3~.62577 B104,000 545.7810 4.390083 166.1142 42.01245 46.69214 857.2273 3616.72~ 57.03000 0.0000000 99.!t50q 1.~51406 1.~4~991 1.83223~ 36.493~9 40.4933~ $054,000 547.4148 -0.1387385 145.7055 30.60028 70.688~5 863.7827 3646.232 57.96440 0.0000000 90.1150~ t.790774 t.846116 1.~26760 51.23474 55.23474 8004. 000 546.7783 -2 · 181 909 13e . 678 5 76 · 62561 66. 09242 ~-47.07~6 3596.5'~9 57. 02409 O. 0000000 99 . t 1 508 1 · 98301 0 1 · 847689 1 . 828895 62 · 00446 66.00446 7954. 000 547. 5056 -6. 256550 137.51 90 25. 08789 71 . 0~720 848 . 21 22 3575 . 01 7 5 8 . 1 4601 O. 0000009 99.1150~ t ~962958 1.845726 1.82646o 75.052~4 7"P. 05284 7904.000 546.6763 8.731247 134.0365 27.92529 6!.66672 85,6.6140 3558.974 57.96440 0.0000000 99.11508 1.904219 1.850208 1.829236 51.53137 55.53136 7854.000 546,7827 -4,876437 137.3885 27.54567 68.16888 866.9661 3533.192 57.99420 O.OOO0000 99.1150~ 2.129322 1.844934 1.828880 56.2~671 60.29671 7804.000 547.7053 -5.967360 142.1725 26.75574 67.30872 872.9111 3557.115 5~.07991 90.11508 1.827682 1.343788 1.825799 65.0~201 ~.06201 7754.000 547,440! 2.017722 132.7044 74.57472 ~70.5t87 3497.325 58.10341 O.O00000O 9~.1150~ !.822~80 !.850553 t.$2660~ 53.4~576 57.~9577 7704.000 545.381,~ 0.! 50~259E-01 70. 3826° 874. 2561 345'9. 796 99. ! 1 50S ! . &,i~7 200 1 . ~.48842 51.~,78t5 137.8622 ~ 2359(3 1.$33578 30.14890 O.O00CO00 47.4781¢ 6'1.4~¢ 58 90.!150 54.6954 7604.000 65.4164 99,1150 61 .9604 7554.000 58.1881 99.1150 70.3548 7594.000 66.2500 o9,1150 ~R t990 7454.000 63.8259 99.1150 7434.000 64,5931 99.1150 60.52!6 73~4 64.8812 99.1150 7~.42R5 7304.000 69.0148 99.1150 7Z.4604 7254,000 67,0005 9o.1150 59.3540 7204.000 54.197~ 99.!150 74.3696 7154.000 66.1006 99.1150 64.5110 7104.000 129.772 9~.!150 69.4227 7054.000 98.0674 9~.1150 '7t.7804 870.5173 1.87e345 549.7708 862.4851 1.$85554 546.5420 876.9133 1.834050 545.0225 8~0.9673 1,806268 · f. .2 8545 f~ 496 3 ,,579 7734 ~' 5/-+ 12'z 545.8303 1.92~612 547.5457 871.2549 2.365487 547.6987 ~5t 5398 1.833485 546.7529 868.8037 2.093~g9 545.8193 $57.7473 2. 404495 548.8083 863.~277 1.848322 547.9856 863.1465 1.834595 3475.286 1.845770 -1.020981 5412.877 1.843466 1 .935274 341~.772 I 850'"z '~ 2 -4.~90274 3379.107 1.~44625 -2.588o37 3363.90& !.~2054 -3,14~427 3'369.257 I ~ 51 z 1 3 -0.421t439 3;57.642 1.848355 -c ~6931 7 3~87,902 -2.541773 3~64.297 1.¢46487 6.$61974 3300.466 1.850239 -7.520494 3261.896 1.850309 -4.416461 3~29.022 1 · 841 964 -2.864656 3136.790 1.843200 58.98820 1 .~24347 1 37 1 'z24 5~.8F. 490 1. :~20596 137.052~ 5~.20030 1.829655 137.5794 55.88490 1 .824742 t37.745S 50.~,4212 1.823899 139.7996. 61 .38739 I . ~'3020o 130.0220 60.67311 1.832071 134.2603 60.95610 t.825332 134.9204 61 .51410 1 .825821 141.8010 61.02370 1.828979 131.8582 61,97078 1.832108 130. 085,?, 61 .00571 1 .82212~ 130.1088 58.98820 1.824865 0.0000000 50.6~:~41 27.02632 O.OOrO000 57.96049 25 7o08~ O.O000000 65.35~4 2~..74S73 n OOOGOC'O 54.1 "~ 90 ;:l 78.30716 0.000,300n 49.75591 27.¢0~37 0.0000000 56.52162 23.6765C: 0.0000000 72 42~54 24.65213 0.0000000 68.~6040 ~7.56073 O.O000000 55.35403 25.95037 0.0000000 70.35967 25.7a~72 0.0000000 60.51102 24.58873 0.0000000 65.42279 24.09688 0.0000000 67.78946 2 · 01151 3 I .843751 1 . 825309 81 · 00406 -'9'9. lq 508 85.00406 TOTAL DATA RECORDS STARTING TAPE DEPTH FILE TRAILER **** : 278 - 90~ 4 O0 ENDING TAPE DEPTH 6974.00 **** TAPE LiS 8,5/11/25 3611 01 TRAILER ~**~ TOTAL RECORDS IN THIS L.OGICAL TAPE : 465 **** REEL LiS $~/11/25 ATLAS 01 TRAILER **** TOTAL RECORDS IN THIS LOGICAL REEL : TOTAL RECORDS IN THIS PHYSICAL REEL: End of execut±on: Thu 1 DEC 88 Elapsed execution time = I mznute , SYSTEM RETURN COD; = 0 5:24a 56.0 466 466 seconds.