• WELL COMPLETION OR RECOMPLETION REPORT AND LOG
�
1a.Well Status: Oil ❑ Gas U SPLUG ❑ Other❑ Abandoned Q Suspend 1 b•Well G CC '��1
20AAC 25.105 20AAC 25.110 Developmel❑ Explorat
GINJ ❑ WINJ❑ WAGS WDSPL❑ No.of Completions: ServicCI Stratigraphic TIC
2.Operator Name: 5.Date Comp.,Susp.,or 12.Permit to Drip umber:
North Slope Borough-Barrow,Alaska Aband.: 4/22/2012 ■ 90-112 i 3r z.. --Ii-Pi
3.Address: 6.Date Spudded: 13.API Number:
Dept.Public Works,1689 Okpik St.,Barrow,Alaska 99723 10/21/1990 ' 50-023-20027-00-00
4a.Location of Well(Governmental Section): 7.Date TD Reached: 14.Well Name and Number:
Surface: 332'FSL,459'FWL Sec.24,T22N,R17W,U.M. 11/2/1990 . EB-21
Top of Productive Horizon: 8.KB(ft above MSL): 23.5 15.Field/Pool(s):
same as surface coordinates GL(ft above MSL): 7
Total Depth: 9.Plug Back Depth(MD+TVD): East Barrow Gas Field
same as surface coordinates 2118 and/tvd
4b.Location of Well(State Base Plane Coordinates,NAD 27): 10.Total Depth(MD+TVD): 16.Property Designation:
Surface: x- 698054.5 y- 6305669.9 Zone- 6 2160'md/tvd UIC Private Land
TPI: x- same y- same Zone- 6 11.SSSV Depth(MD+TVD): 17.Land Use Permit:
Total Depth: x- same y- same Zone- 6 Not utilized Permit No.:10-252
18.Directional Survey: Yes [i No 0 19.Water Depth,if Offshore: 20.Thickness of Permafrost MD/TVD:
(Submit electronic and printed information per 20 AAC 25.050) onshore (ft MSL) 924'md/tvd
21.Logs Obtained(List all logs here and submit electronic and printed information per 20AAC25.071): 22.Re-drill/Lateral Top Window MD/TVD:
CNL-CDL-GR,DLL-GR,BHC Sonic-Cal GR,CBL-CCL-GR not applicable
23. CASING,LINER AND CEMENTING RECORD
WT.PER SETTING DEPTH MD SETTING DEPTH TVD AMOUNT
CASING FT GRADE TOP BOTTOM TOP BOTTOM HOLE SIZE CEMENTING RECORD PULLED
Structural
Conductor 13-3/8",72# S-95 23 59 23 59 17-1/2" 121 sxs Perm. None
Surface 9-5/8",53.5# N-80 22 1431 22 1431 12-1/4" 666 sxs Pmfst to surface None
Intermediate
Production 7",23# N-80 21 2160 21 2160 8-1/2" 105 sxs CL G None
Liner
24.Open to production or injection? Yes U No 0 If Yes,list each 25. TUBING RECORD
interval open(MD+TVD of Top&Bottom;Perforation Size and Number): SIZE DEPTH SET(MD) PACKER SET(MD/TVD)
2-3/8",4.7#J-55 1935 not utililzed
RECEIVED
26. ACID,FRACTURE,CEMENT SQUEEZE,ETC.
SEP 17 201L DEPTH INTERVAL(MD) AMOUNT AND KIND OF MATERIAL USED
AOGCC
27. PRODUCTION TEST
Date First Production: Method of Operation(Flowing,gas lift,etc.):
Date of Test: Hours Tested: Production for Oil-Bbl: Gas-MCF: Water-Bbl: Choke Size: Gas-Oil Ratio:
Test Period -�
Flow Tubing Casing Press: Calculated Oil-Bbl: Gas-MCF: Water-Bbl: Oil Gravity-API(corr):
Press. 24-Hour Rate fl n n n
28. CORE DATA Conventional Core(s)Acquired? Yes No Sidewall Cores Acquired? Yes No
If Yes to either question,list formations and intervals cored(MD+TVD of top and bottom of each),and summarize lithology and presence of oil,gas or water
(submit separate sheets with this form,if needed).Submit detailed descriptions,core chips,photographs and laboratory analytical results per 20 AAC 25.071.
SCANNED AiiG 0 2 2013
RBDMS SEP 101/3.2W
Form 10-407 Revised 12/200r-4
2/200 CONTINUED ON REVERSE 74 j_-.S /3 Submit Vl-only
• •
29. GEOLOGIC MARKERS (List all formations and markers encountered): 30. FORMATION TESTS
NAME MD TVD Well tested? ❑ Yes ❑ No If yes,list intervals and formations tested,
briefly summarizing test results.Attach separate sheets to this form,if
needed,and submit detailed test information per 20 AAC 25.071.
Formation at total depth:
31. List of Attachments:
32. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact:
Printed Name: 4(� o t 7_ Title:
Signaturq: I (^^,/1, 4..1 `y Phone: C q O1)L1 i- . i 1b3 Date: c1 .
INSTRUCTIONS
General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska.
Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is
changed.
Item 1b: Classification of Service wells: Gas Injection,Water Injection,Water-Alternating-Gas Injection,Salt Water Disposal,Water Supply for
Injection,Observation,or Other.Multiple completion is defined as a well producing from more than one pool with production from each pool
completely segregated. Each segregated pool is a completion.
Item 4b: TPI(Top of Producing Interval).
Item 8: The Kelly Bushing and Ground Level elevations in feet above mean sea level. Use same as reference for depth measurements given in
other spaces on this form and in any attachments.
Item 13: The API number reported to AOGCC must be 14 digits(ex:50-029-20123-00-00).
Item 20: Report true vertical thickness of permafrost in Box 20. Provide MD and TVD for the top and base of permafrost in Box 28.
Item 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool.
Item 24: If this well is completed for separate production from more than one interval(multiple completion),so state in item 1,and in item 23 show
the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately
produced,showing the data pertinent to such interval).
Item 27: Method of Operation: Flowing,Gas Lift,Rod Pump,Hydraulic Pump,Submersible,Water Injection,Gas Injection,Shut-in,or Other
(explain).
Item 28: Provide a listing of intervals cored and the corresponding formations,and a brief description in this box. Submit detailed description and
analytical laboratory information required by 20 AAC 25.071.
Item 30: Provide a listing of intervals tested and the corresponding formation,and a brief summary in this box. Submit detailed test and analytical
laboratory information required by 20 AAC 25.071.
Form 10-407 Revised 12/2009
• • 3601 C Street Suite 1424
•
Anchorage, AK 99503
907-272-1232(voice)
907-272-1344(fax)
info @petroak.corn
Aa�►�/�.t;RAI�
STATE OF ALASKA
OIL& GAS CONSERVATION COMMISSION E E I '
333 W. 7th Ave. Suite 100 S E P 17 `[
Anchorage, AK 99501
AOGCC
To: Steve McMains—Sr. Petroleum Engineer
From: Mike Cook—PetroTechnical Resources Alaska
Date: 9/17/2012
Re: Plug&Abandonment , AOGCC 10-407 Form Submittal
Dear Sir,
Petrotechnical Resources Alaska (PRA), providing well design engineering support for the
North Slope Borough's - Barrow Gas Fields Well Drilling Program is submitting by attachment
Well Completion or Recompletion Report and Log forms supporting program well plug and
abandonment well work.
Attached find Form 10-407 submittals for wells:
1. East Barrow#15
2. East Barrow#19
3. East Barrow#20
4. East Barrow#21
egards, �,
gL�t
tiLu-
Mike Cook
Petrotechnical Resources Alaska
Office : (907) 677-5103
Email : mcook @petroak.com
• •
EB #21
AOGCC 10-407
Submittal
• •
Well: East Barrow 21
Post P&A : 4-22-12
JL 13-3/8" 72#Casing cmtd at 59' in 18" hole w/ 121 sx Perm Cmt
7" X 9-5/8"Annulus Arctic Packed from ?? ' to surface through FO
9-5/8" 53.5# N-80 Casing cmtd at 1431' in 12-1/4"w/666 sx Perm cmt.
Arctic Pack in 7"X 9-5/8"Annulus 1200' to surface
: ;: :;:::: :::::: Balance Isolation Tool at 1935 with Flow area of 3.12 sq in
2-3/8"Tubing to 1967' No Packer
• Perforations 6SPF with Van Tubing Conveyed guns 0.48" Dia shots
=: :�: : :•' : : _ 1976-1984'
1988-1990' Van Guns left on tubing
1991-2006'
'- 2008-2011'
2014-2016'
: :a: ::::::: : = 2033-2039'
:::::::::S: .:= 2042-2048'
‘ ,A,..,1: --L:.:.::.:::.::.::':::::.:..:11\ PBTD 2118'
7" 23#N-80 Casing cmtd at 2160' in 8-1/2" hole w/ 105 sx G cmt.
p_. 4/23/1993 Slickline gradient in tubing with bottom depth= 1957'
�o^'� 5/4/1995 Attempted to fish out firing bar;only able to get to 1938'with slickline
• •
TICKET M TICKET DATE
JOB LOG 9451394 04/22/12
REGION NWA COUNTRY RCA I STATE COUNTY
North America Alaska Alaska North Slope
H.E.S EMPLOYEE NAME PSI.DEPARTMENT
Fisher,Glen 281249 ZI-Cementina
LOCATION COMPANY CUSTOMER REP/PHONE
North Slope North Slope Borough Matt 907-771-1021
WELL TYPE API V
2012-53
WELL LOCATION DRILLING CONTRACTOR JOB PURPOSE CODE
Other J115 Plug to Abandon
LEVEE NAME Well No. RIG i 1NELL TYPE
EB 21 06 Abandoned
Time Volume Rate(BPM) Press(PSI) Job Description/Remarks
(BBLS) (AVG) (MAX) (AVG) (MAX)
on location
1000 Rig up and have safety meeting
1322 Pressure test pumps and Tines
1325 Open well head to cutting box,LEL's was too high next
to equipment so peak came in and moved boxes
1435 Open tubing read pressure of 848psi
1447 1.00 1.0 65 136 Mix and pump 210 sks Type C at 13.7ppg down tubing Llt)SA-
1.00 1.0 65 65 Well pressure was blowing cement out of hole so
1.00 1.0 55 55 AES shut in inner annulas to try to gain pressure on tubing_
1645 50.0 tubing continued to have a vac on It so switched to I.A.
1645 29.8 1.00 1.0 750 1250 Mix and pump 125 sks Type C at 13.7ppg down I.A. (ZS e
1721 1.00 1.0 1155 1250 I.A.gained pressure of 1250 psi shut down pumped
1721 14.3 1.00 1.0 125 125 down tubing 60 sacks of Type C at13.7ppg still tubing ✓ 4 D se
was on a vac switched over and pumped back Into
1737 2.0 1.00 1.0 465 500 I.A.gained pressure of 500 psi,5 sks type Cat 13.7ppg
1756 shut In well end Job
4/23/2012
1050 Pressure test pumps and lines
1052 open tubing 232 psi
1116 0.1 1500 1500 Pump down tubing unable to pump psi up to 1500psi
1120 open I.A.330psi,pressure bleed off as soon as it was vented
1124 30.0 0.80 0.8 400 1500 Mix and pump 125 sks Type C at 13.7ppg down I.A. / `C- K
1212 Pressure up to 1500 psi let stand for 5 minutes then
_pressure up on it to 1500 psi several times then shut In wel
Unable to pump down O.A.due to rat hole culvert In way
Peak will un dig cellar and will return to pump down OA
4/25/2012
800 On location
830 rig up equipment
947 Prime pumps with water
959 2000 2000 Pressure test pumps and lines
1001 Pump to tank till cement was seen
1003 13.0 1.00 1.0 500 500 Mix and pump 55 sacks of Type"C"at 13.7ppg
1018 13.0 0.20 0.2 1500 1500 Annuls pressured up to 1500psi
1026 1475 1500 let sit till 1400ps1 brought it up to 1500psi
1035 1475 1475 watched fora few minutes then shut in well at 1475psi
1100 End Job rig down
(;--76� Jz
-6V
r
,410 Jiiiiti4, `
s ,..-te r' t
% i
•
II
ISCII
•
•
t.
1 ., � ��s�,r$`III.
1
•
, i•al io, \ , ,
w
e
f.,,„.-,,,, ,, '.4-,;,,,,k, 4 44- *-iii i .
s.' r k's
4-r.,:-. .,,,,..— ' ..a. ,' r " ., u' ..' ,
4.
1 ' „ .
te
as
?
A
1
•
p.,.....
.....
I
..
....,
,.
.
ram. . .
F. „,-, .du- ., +u:en!, .i V
�:simcf, - TES•:, d
tbn y; "#
It
+
a
•
,.'"°'fit
IIR.Ar. .4 41444
1111 .F , r.w '.
a i rw
t
►'
4...• { Y " �,-
Vii, } .t" "r� � '`. ` '' MSS ';.,'••• # • ••:: ,,,,.x.; ., 'I'
-b.,,^ 8Y •- 'f. < w wb''F+ '� +. ! -ti• A.y. IL 11 - 'vt s } �._•
• Y 1 r
�k ' •. _::: , 4' '434t' .t.''''.f '''' ,., .111.'•7,*'0-,,,, . X )46 . ` "'' '4.-:1%07: ."'.'4_,. ..,
in rat. _ A ( „ ..�
41.141114.11i. �r••
A.:.„.,.
l• r ♦°7�,,. �• Y •>•�,'. y ;!.nom +. - y;
{ aN �'' yf •x- dd
Y F.
.•, .1* o t .. '5,.'..
i -r •
•
+ -* 'mss' a'yr f, ' l ! .. .
'1 ....f
..�,� 4 , 44•'(.x,
0. ' w.M mow. 1 e w � +
I,
e.
,z v sx
a
�Y x
Y •i ,
�(y.�.- j :. a away_ - •`�
a
.lilaW7'
C/C
r r
v
r -
-w
wa
.. r. .�
4t
,,,.*,'•, rit. ilik '.•.,0"r",.,,. '*';,, ,
Y
.,„ }., . .4.
s
e� u mof
'•
.M.�
r ,,i f y_7•
r'! ; x k"r'� Y M -� r�w�' v _ i •fi„y v i4,, T , ,'w' r c"; x .r," bx •
ftP
,.. c fi. .a4 �a•tom-� � « t' , .a ..,.„.„,..2„,:' , 5 "it Y* Y „41°. a a fr � e i' 4 a a w F.a j .. ,. ,,•
. ,.
, ,aqr., .:, •y
01401114
« t. '_x ..o-.,Y x
s
�� ` ' �`6ii'p x iy Y -1,,..:_:„..7..;,,,-.,..,:,_:: , __
.�.. p .. w,i....,.„,.,.,. sT•
..
..
,.,, .
..„,.. ...t4,, ,.;.:•''''
.:.
4
h
.; ,.
« $ # o
}�
„.
•
u'
,.
_ _
., ,•. e'er c ,r,'>?
r° n
s -
”
w
4�
» . Are w
S
d
Oilfield Service Co.
September 11,2012
12-GEN-108
Mike Cook,
Petrotechnical Resources Alaska
3601 C St#822
Anchorage,AK 99503
Subject: PM Work
Peak Oilfield Service Company, Contract#2011-008
Project: CIP No.68090/68091: Barrow Gas Fields Well Drilling Program
Description: Cut off depth of Plug and Abandoned Wells on the project
Dear Mr. Cook:
This letter is to confirm the completion of the Plug and Abandonment activities for the Barrow Gas Fields
Well Drilling Program. As you know the following wells were Plugged and Abandoned over the course of
the project.
Walakpa#2
NSB-02
SB-13
SB-11
SB-08
EB-20
EB-19
EB-21 .S
EB-15
For each well the Plug and Abandonment procedure was followed by Peak. After Haliburton completed
the cement job,our crews excavated around the wellhead. Once the area was excavated and a confined
space permit was opened, a measurement was taken from the existing ground level down three feet In
each case a representative of PRA or the NSB was on site to ensure that the cut off mark was 3 ft below
the existing ground level. Once this cut off mark was verified, the well head was cut off, either with a
cutting torch or in one case, with a guillotine saw. At this point Halliburton came back and completed a
top job for the wells in which it was needed, the well maker plate was welded on and the excavated area
was backfilled. This can be confirmed by the photos that were taken during the procedures and by the
PRA&NSB representatives.
If you have any questions or need any additional information please don't hesitate to contact me.
Sincerely,
PEAK OILFILED SERVICE COMPANY
Eric Wieman
Project Manager
• •
a
SEAN PARNELL, GOVERNOR
ALASKA OIL AND GAS 333 W. 7th AVENUE, SUITE 100
CONSERVATION COMl1'IISSIOAT ANCHORAGE, ALASKA 99501 -3539
PHONE (907) 279 -1433
FAX (907) 276 -7542
Michael Cook
Engineer CI 0
North Slope Borough
1689 Okpik Street
Barrow, AK 99723
Re: East Barrow Field, East Barrow Gas Pool, East Barrow #21
Sundry Number: 312 -144
Dear Mr. Cook: 5-'"'L APR
Enclosed is the approved Application for Sundry Approval relating to the above
referenced well. Please note the conditions of approval set out in the enclosed
form.
As provided in AS 31.05.080, within 20 days after written notice of this
decision, or such further time as the Commission grants for good cause shown,
a person affected by it may file with the Commission an application for
reconsideration. A request for reconsideration is considered timely if it is
received by 4:30 PM on the 23rd day following the date of this letter, or the
next working day if the 23rd day falls on a holiday or weekend.
Sincerely,
Cathy . Foerster
Chair
DATED this r day of April, 2012.
Encl.
1 ti „ ECE1VED
QQ 16 4u ATE OF ALASKA
s P' ') \LASKA OIL AND GAS CONSERVATION COMMISSION Art( 0 6 2.0 .'
gg� APPLICATION FOR SUNDRY APPROVALS /�("�
20 AAC 25.280 AV
1. Type of Request: Abandc0 _ Plug for Redrill ❑ Perforate Nee Pod ❑ Repair Well ❑ Change Approved Program ❑
Susper❑ Plug Perforations ❑ Perforate ❑ Pull Tubing ❑ Time Extension ❑
Operations Shutdou❑ Re -enter Susp. Well ❑ Stimulate ❑ After Casing ❑ Other ❑
2. Operator Name: 4. Current Well Class: 5. Permit to DrNI Number:
North Slope Borough - Barrow, Alaska Development p . Exploratory ❑ 190-112
3. Address: Strabgraphic ❑ Service ❑ 6. API Number:
Dept. Public Works, 1689 Okpik St., Barrow, Alaska 99723 50 -023- 20027-00-00 .
7. If perforating, closest approach in pool(s) opened by this operation to nearest 8. Well Name and Number
property line where ownership or landownership changes:
Spacing Exception Required? Yes ❑ No El East Barrow #21
9. Property Designation (Lease Number): 10. Field / Pool(s):
UIC Private Land Permit No. 10 -252 - East Field - East Barrow Gas Field •
11. PRESENT WELL CONDITION SUMMARY
Total Depth MD (ft): Total Depth TVD (ft): Effective Depth MD (ft): Effective Depth TVD (ft): Plugs (measured): Junk (measured):
2160 2160 2118 2118
Casing Length Size MD TVD Burst Collapse
Structural
Conductor 40 13 -3/8" ,72 #,S -95 59 59 6,390 2,820
Surface 1412 9 -5/8" ,53.5 #,N -80 1431 1431 7,930 6,620
Intermediate
Production 2139 7" ,23 #,N -80 2160 2162 6,340 3,830
Liner (slotted)
Perforation Depth MD (ft): Perforation Depth TVD (ft): Tubing Size: Tubing Grade: Tubing MD (ft):
1976 -2048 1976 -2048 2 -3/8#, 4.7 # J -55 1935
Packers and SSSV Type: Packers and SSSV MD (ft) and TVD (ft):
Not utilized
Not utilized
12. Attachments: Description Summary of Proposal El 13. Well Class after proposed work: (Abandoned)
Detailed Operations Program 151 BOP Sketch ❑ Exploratory ❑ Development IS • Service ❑
14. Estimated Date for 15. Well Status after proposed work:
Commencing Operations: April 28th ,2012 Oil ❑ Gas ❑ WDSPL ❑ Suspended ❑
16. Verbal Approval: Date: WINJ ❑ GINJ ❑ WAG ❑ Abandoned \ El .
Commission Representative: GSTOR ❑ SPLUG ❑
17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact 1
Printed Name
- 1 i Titl ; `—
l (711 _ L._ Title l .�,(
Signature �n e Date n
1 COMMISSION USE ONLY a
Conditions of approval: Notify Commission so that a representative may witness Sundry Number: 3k Z. 1 1.4 14
Plug Integrity le BOP Test ❑ Mechanical Integrity Test ❑ Location Clearance CJ 5i.r.M /14 07 'zv / Z..
Other: .— NO / of .�/) 5p e C "fd y 45' i ►'"! Li/ C4..,1" rc
Pho/ do61., +" of CvJ f f' Iweidcel p/ate
Subsequent Form Required: / 0 - 4-0
APPROVED BY
Approved by: r COMMISSIONER THE COMMISSION Date: 4 —/ 3 . 7z____
Form 10 -403 Re ised 1/2010 vi_r i' / / / /fz.- Submi n i yir � 1y ORIGINAL � y ��•�
• •
Well Name: East Barrow 21 (East Pool)
AOGCC Well No.: 190 -112
API Number: 50- 023 - 20027 -00 -00
P &A Procedure
WHPacific Pre -Job
1. EB -21 Slick Line tag 1953 ft -md /rkb. Reference attached Well Service Report :3- 12 -12.
Conan - Tigiak
1. Perform surface demolition work. Remove wellhouse and production flow line per
Conam Tigiak contracted work scope.
Well P &A Operations
1. Give AOGCC at least 48 hours notice of plugging operations so that a representative of
the Commission can witness the operations, if they choose to.
2. MIRU Halliburton pumping unit, HES bulk truck, AES Flow back tank & choke skid,
Peak open top cuttings box (100 bbls), Peak water truck (100 bbl - Heated), Peak 100
bbls Vac Truck.
3. NU 5M 1502 chicksan lines from HES cement unit to 2 -3/8" 4.7# J -55 production tubing.
NU 5M 1502 chicksan lines to 2 -3/8" 4.7# x 7" 23# annulus via production tree inner
annulus ( IA ) valve to AES flow back tank. NU 5M 1502 chicksan lines from HES
cement unit to 7" x 9 -5/8" OA.
4. Displacement A : displace the well, through 2 -3/8" 4.7# N -80 tubing, with approximately
353 sxs of "C" (1.28 ft /sxs) cement. At full cement displacement , with confirmed
cement returns to the AES flow back tank, close (IA) and displace 2ea. bbls cement ( 9
sxs) away to perforations (1976 -2048 ft. and /rkb).
5. Displacement B : displace the 2 -3/8" x 7" annuli with approximately 23 sxs "C" (1.28 ft
/sxs) cement to confirm 150 ft of continuous cement is positioned below original ground
elevation. Displace the 9 -5/8" " x 7 ", annuli with 16 sxs "C" (1.28 ft /sxs) cement to
confirm 150 ft of continuous cement is positioned below original ground elevation Do
not exceed the 80% burst/collapse pressure rating(s) on either the 9 -5/8 ",53.5 #, N -80
surface casing or 7 ",23 #, N -80 production casing.
Casing Burst Rating (psi) Collapse Rating (psi)
9 -5/8 ",53.5 #, N -80 7930 6620
7 ",23 #, N -80 6340 3830
• •
6. Rig down (RD) HES manifolding/chicksan lines to all annuli. RD all
Halliburton/Peak/AES support equipment and move off of location.
a. Ensure HES cement rinsate /cement phase is captured in Peak open top cutting box
with cement /rinse water interphase ( 2.5 3.00 bbls).
b. Remaining rinsate /wash water to be pumped to Peak 100 bbl Vac truck.
7. Prior to excavation, either the onsite company man or a surveyor will mark the existing
ground level on the conductor pipe. Excavation work and abandonment marker plate
installation shall be documented with photographs thru to conclusion of the wells P &A
workscope.
8. Excavate around the conductor casing at 6 ft below ground level. Peak will utilize either
a 200 or 400 size excavator, rented from Umiaq, with a frost bucket.
9. The size of the excavation will be roughly 5 ft from the conductor casing to the bottom
edge of the excavation. Three sides of the excavation will have side slopes of 1:1. The
fourth side of the excavation will have a side slope of 3:1. This will allow easier access
into the excavation for cutting off the conductor.
10. Prior to entering the excavation, a confined space permit will be opened. This includes
testing with an atmospheric testing meter.
11. The cut mark on the conductor casing will be measured 3 ft below the initial existing
ground mark, made prior to excavation. The welder will then mark the cut line around
the conductor. A second line will be marked roughly 1 ft above the cut line.
12. A drill will be used to drill 3 to 4 small holes '/" to ' /2" in diameter along the cut line. As
the welder drills through the metal pipe, he will look to see if there are cement cuttings as
well as metal.
13. The atmospheric testing meter will be used to test the air inside of the conductor at each
of drill holes.
14. Prior to cutting, the excavator bucket will be extended over the tree. The tree will be
attached to the excavator with approved lifting devices (straps). The bucket will be
moved up to where there is no slack.
15. Once it has been verified that the air is suitable for hot work, the welder will begin
cutting the conductor along the first cut line. He will also cut on the line roughly one ft
above the bottom cut line. In two places he will cut from line to line. (Peak will fill out
the clients hot work permit if required for cutting the pipe).
16. This section of the pipe will be removed.
17. The cement from inside the conductor pipe will be removed.
18. Steps 15, 16, 18, 19, and 20 will be repeated for each section of pipe.
19. When cutting the final section of pipe, extra care will be taken to ensure that personnel
are out of the line of fire.
20. After the final cut has been made the excavator will be used to raise the tree and pipe and
set to the side.
21. The company man will verify that the cement is to the top of the pipes.
22. The welder will weld the top plate to the top of the conductor per 20 AAC 25.120.
23. Pictures will be taken by the company man.
24.
• •
25. All equipment will be removed from the conductor hole and backfill around the
conductor will begin with the existing material. Additional gravel will be brought in to
dress the fill, leaving a mound above the conductor pipe to account for
eventual settling of the material. At least 30% overfill will be used to account for the
settling.
26. The tree will be hauled to the land fill and other equipment demobilized.
Equipment and Supplies List
1. Peak :Light plant — at least (2) diesel powered light plants to provide complete coverage around
the wellhead and equipment spread.
2. Peak : Tioga heaters (2) for keeping wellhead area warm.
3. AES : Flow back vessel, vented to atmosphere, for gas venting during cement displacement.
4. AES : Choke manifold skid — 3000 psi SWP, positioned upstream of flow back vessel for
throttling gas flow rate.
5. Umiaq : EX 450 or 400 excavator for surface excavation work around well conductor
6. Kuukpik Drilling: 1" cement workstring — 200 ft.
7. HES : 2" 5000 psi chiksan pipe and swivel joints, 250'
8. HES Cement Unit
9. HES : cement bulk truck, approximate load out : 500 sxs "C" cement.
10. Peak : tractor /equipment trailer for transiting Excavator 450
11. Peak : 150 bbl water (heated) truck
12. Peak : Welding machine for welding marker plate on top of outermost casing string, acetylene
cutting torch for cutting off casing below ground level
13. Peak : Loader w/ forks/bucket (Cat 966)
14. Peak : Maxi Haul/Rock Truck — moving casing/well head assembly to waste disposal site
15. Conam - Tigiak : Flatbed truck to haul well house surface demolition refuse to waste disposal site.
Personnel List
1. Roustabouts — set up light plants, tioga heaters
2. Well House surface demolition personnel
3. Cementing crew for connecting chiksans, circulating well, mixing and pumping cement
4. Water truck driver
5. Flow back tank/choke operator
6. Heavy Equipment operators : rolling & loading equipment for surface demolition and site
reclamation work scope
7. Welder /helper for cutting tubing, and cutting casing below ground level
8. Roustabouts for handling, disposing of tubing, casing, wellhead
9. Backhoe operator for digging around casing, back filling over old well
r. t he f f hdf d "' , q iw 4i at (0405
coAcv l irr,' l n / 4 e, r 1 " �,� �`l ii i � f t4,4) QQCeitber 1 ( e55 7 � � ?� 4 4' tee.? f'r okal 2
(fedi/ c,'45.
I�{ n2. f 4 v. ''t a7/ t 2 In elf 14dat f f °./.
per,- froo 4 ," ponw7i , g / r fi y CAri t o, Off)
ecov�
r 24 w. elf to riviy,- Socii ate Code/ "''
•
Pre- Abandonment : East Barrow No. 21
Well: East Barrow 21
13-3/8" 72# Casing cmtd at 59' in 18" hole w/ 121 sx Perm Cmt
7" X9-5/8" Annulus Arctic Packed from ?? ' to surface through FO
k 9-5/8" 53.5# N-80 Casing cmtd at 1431' in 12-1/4" w/ 666 sx Perm cmt
Arctic Pack in 7" X9-5/8" Annulus 1200' to surface
Balance Isolation Tool at 1935 with Flow area of 3.12 sq in
2-3/8" Tubing to 1967' No Packer
TT Perforations 6SPF with Van Tuging -Con eyed guns 0.48" Dia shots
• • = 1976 -1984'
• 1988 -1990' Van Guns left on tubing
= 1991 -2006'
_ • = 2008 -2011'
_ • = 2014 -2016'
• = 2033 -2039'
• = 2042 -2048'
PBTD 2118'
7" 23# N -80 Casing cmtd at 2160' in 8-1/2" hole w1 105 sx G cmt.
4/23/1993 Slickline gradient in tubing w ith bottom depth =1957'
5/4/1995 Attempted to fish out firing bar; only able to get to 1938' w ith slickline
EB-21 : P&A Displacement - Cement VolumesJSxs Requirements
Displacement P &A Displacement : Lower Plug Capacity Length Volume Vol ft"3 Cement (sxs)1 Yield:
A p 9 P Y bbls 9 (bbls) () 1.28 ft"31sxs
2-3/8" 0.00405 2048 8.29 46.56 36.38
7" 23# 0.0393 70 2.75 15.44 12.07
7" x 2-3/8" 0.0339 2048 69.43 389.76 304.50
80.47 451.77 352.95
Displacement Cement (sxs) I Yield:
B P &A Displacement : Upper Plugs Capacity Length Volume (bbls) Vol (ft"3) 1.28 ft"31sxs
2-3/8" 0.00405 150 0.61 3.41 2.66
7" x 2-3/8" 0.0339 150 5.09 28.55 22.30
9-5/8" 53.5# x 7" _ 0.0232 150 3.48 19.54 15.26
9.17 51.49 40.23
•
4 ,q3. /g
• •
WH PACIFIC
WELL SERVICE REPORT
Date: - - 2. Well Number.
Work being done: WRIbri Location:
Supervisor. IIMS1111111111111111 AFES / Charge Cods:
Wrenn* Unit Number. Pollard Wino Cnw: /;T': .
Tree Connection StseMipe fir," Total WUrllne Wes:
Tree condition 11111M1Vallill Wk. Tab
Fluid Level If identified - --- Max Depth (KB): ONE1!)
Zero Winners at 1116771#71M111 Well KB: Mr
Minimum Tubing ID: Max Tool OD: Mt
Start Tbg. & Cog. PSI --- Ending Tbg & Csg PSI
Oorwation Malls Wit. valve 1 z.
1!../ affilf8171211‘21111111W.Arei
I 2M/l'Ai fir
.08/0e.• .08/0e.• .08/0e.• it u a ar 1447
vO1 uu+
n T7 t , J , - � d � � p ` Airif
Site mil length ... I
Deearlption of any
tools or debris alt "`""""'
In the hole:
ry of r Its 'l."3T1 �rf�CS:MJilrialarPr!Ii?! arT
Total Work
Completed
- ota ' oum ^ ., otal oo o i 07'1'
Ticket N
D Cost: Cumulative Cos
Well Downtime Hr. Sh t j 1 H2$ PPM
Approved by .� , /M / Code:
• •
-^ STATE OF ALASKA
ALr._.:A VIL AND GAS CONSERVATICG.: CL r.tMISSION
WELL COMPLETION OR RECOMPLETION REPORT AND LOG -ef •
1. Sums of Well Cletalicatiou of 5ii ce Will
OIL D. GAS 2 SUSPENDED 0 ABANDONED 0 SERVICE -
2 None of Operator W4 '41411'0 7. Permit Number
North Slope Borough VERIFIED 90 -112
3. Arfdra. 3dt S. API Number
P.O. Box 1120 Barrow AX 99723 so -023- 20027
4. waitron al wall at surface t7 IL Unit or lease Name
332' FBL, 459' E1L Sec. 24, T22N, KW, U.M. East Barrow
i At Tap Producins Monad MUM 10. Wall Number
same 4t _-- 821
At Total Depth 11. P old end Pam
;, e
. I I East =- t r ield
• � B. Lau Oesiontakm end WIN No East Barrow Barrow Gas
12.Oats Spudded 13. ono T.D. Raohed 14. Date Con ben
Sup. or Ad. IS. Warp ONO. it offshore 16. No. of Compkm
iio
I _ 1 -2 -' • ..1 -' 1 N feetMEL I.
1% 17. Teel papal IMO.TVD) N.PM15 SIM 0.114474VDI 111. 0weetlonal Survey 20. Oepdt where SSSV sat 21. Titickn** of Per nalrost
. 1 ' d: a!! : ' _,t Y'! YES D NO N ., feat MO 924' KB
22. Type Electric or Other Lost Run
1 •L ,,.6 ► :- r ' BBC Sonic -Cal GR CBL-O L-GR
23. CASINO. LINER AND CEMENTING RECORD
SETTING DEPTH MO
CASIN4E12E WT. PER PT. GRADE TOP BOTTOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED P41111. none
N-80 {EN N-80 ,face 10 s x G1ass G mono [ IIIIIIIIII
24. Perforations open to Production IMD+TV O of Tap and Batton and 25. TUBING RECORD
I Uterval. sise and n unbar) SIZE OEPTM SET IUDs PACKER SET PAM
1976 -1984' 8' 2 3/8" 4.741 -55 1935' .
1988 -1990' 2'
I 1991 -2006' 15• 25. ACID. F RACTURE. CEMENT SOUEEZE, ETC.
t 2008 -2011' 3' DEPTH INTERVAL IMDI AMOUNT • KIND OP MATERIAL USED
2014 -2016' 2'
1 2033 -2039' 6'
2042-2048' 6'
• tr,_ 1 :• ■ . :■• .
27. PRODUCTION TEST
1 Data Putt Production Method of 0paratlen IPMore45. ow left, sic.)
Dap of Tat j PRODUCTION P0R 0144BL GAS4MCP WATER4$L CHOKE SIZE (WAIL RATIO
1 TEST PERIOD : t,t „ ». 4e, . _
Roes Tubing Casino Prawn CALCULATED OIL4BL 4B MCP
A WATERIBL OIL GRAVITV•API Howl Press. 782 786 24440UR RATE wr ' 8 t 1 : t N/A
CORE DATA
: Brief dnalptfoa of IIYtolay, porot sy. imam apparent dips and preeuwu of ere, pp or water. Submit cae dupe.
none *
i
RECEIVED
DEC 141990
Alaska 011 & Gas Cons. Combo
Anchorage
. Pons 10407 Submit in duplicate
Rev. 7440 CONTINUED ON REVERSE SIDE ry
ID •
L 11E
SEAN PARNELL, GOVERNOR
ALASKA OIL AND GAS 333 W. 7th AVENUE, SUITE 100
CONSERVATION COMMISSION ANCHORAGE, ALASKA 99501 -3539
PHONE (907) 279 -1433
FAX (907) 276 -7542
Michael Cook
Design Engineer
North Slope Borough 0
1689 Okpik Street
Barrow, AK 99723
Re: East Barrow Gas Field, Undefined Pool, East Barrow #21
Sundry Number: 311 -173
�,�°", iio ." JUL 1 4 2O)i
Dear Mr. Cook:
The Commission DENIES the enclosed Application for Sundry Approval relating
to the above - referenced well. Please see attached for explanation of the
DENIAL.
As provided in AS 31.05.080(a), within 20 days after written notice of this
decision, or such further time as the Commission grants for good cause shown,
a person affected by it may file with the Commission an application for
rehearing. A request for rehearing is considered timely if it is received by 4:30
PM on the 23rd day following the date of this letter, or the next working day if
the 23rd day falls on a holiday or weekend. A person may not appeal a
Commission decision to Superior Court unless rehearing has been requested.
Sincerely,
Daniel T. Seamount, Jr.
Chair
DATED this I day of July, 2011.
Encl.
STATE OF ALASKA
ALASKA AND GAS CONSERVATION COMMISSII
ANNULAR DISPOSAL APPLICATION
20 AAC 25.080
1. Operator Name: North Slope Borough 3. Permit to Drill No: 90 -112
4. API Number: 50- 023 -20027
2. Address: North Slope Borough 5. Well Name: E.B. #21
Department of Public Works
1689 Okpik Street 6. Field: East Field - East Barrow Gas Field
Barrow, Alaska 99723
7. Publicly recorded wells 8. Stratigraphic description: See attached EB -21 Geologic Summary
a) Interval exposed to Marine shales,claystones, and thin silty
a) All wells within one- S.B. #18 : 900 ft. Plugged & Abandoned open annulus: sandstones
quarter mile:
b) Waste receiving 1,450 - 1,700 tvdss
zone:
b) water wells within None
one mile: c) Confinement: HRZ : top 1380 ft. tvd /ss , thickness = 20 ft.
9. Depth to base of 950 ft. tvd /ss 10. Hydrocarbon zones None
permafrost: above waste receiving
zone:
11. Previous volume disposed in annulus and date: 12. Estimated slurry density: Slurry D ' ra 13. Maximum anticipated pressure at shoe: 1000
No recorded volumes. 9.0 - 12.5 ppg psig
14. Estimated volume to be disposed with this request: 35,000 bbls 15. 'd to be dispo
I ng as per 25.080 sect. (h) parts: 1 -3
\c-\\N r 1VEC
16. Estimated start date: August 15, 2011
A X \ e , D
Vii% l GiNt CAM.,
+iiE 1f8$i01Y
17. Attachments:
Well Schematic (Include MD and TVD) Cement Bond Log (if required) 0 FIT Records w/ LOT Graph ❑
Surf. Casing Cementing Data IS Other 0 Geologic Summary, EB21 log section, PTD Form.
18. I hereby cf rtify that the foregoing is true and corr to the best of my knowledge.
,
Signature: ► , l� / �1 :prat Ate' i
RA-
,
Prin 1 " Phone
Name: 1 ! �� } , t Number: Date: ,
Commission Use Only
Conditions of approval:
LOT review and approval:
Subsequent fo Approval � n n
req ed: number: f ✓ �
Approved APPROVED BY
by: COMMISSIONER THE COMMISSION Date:
FIBDMS I N A L 6. L, • ,,
JUL 142011 ORIG
Form 10 -403AD Rev.6 /2004 INSTRUCTIONS ON REVERSE l� Submit in Duplicate
• •
East Barrow #21
Proposed disposal well East Barrow #21 is centrally located on the crest of the East
Barrow Gas Field. The nearest producing gas well, South Barrow #14, produces from the
Barrow Sandstone more than 2,800 feet away. The nearest wellbore, South Barrow #18,
which is plugged and abandoned is 900 feet away. Planned horizontal gas producer
Savik #1, which will also produce from the Barrow Sandstone, will be about 450 feet
from the proposed disposal interval at East Barrow #21.
In East Barrow #21, the proposed annulus for the disposal of drilling waste extends from
the 9 -5/8" surface casing shoe, set at 1,433 TVDss and cemented to surface, to the top
of cement anchoring the 7" intermediate casing string, estimated 1,700 TVDss. The 7"
intermediate casing string was set at 2,200 feet TVDss, and cement was planned to
come up —500 feet TVD.
The targeted injection interval is beneath the High Radiation Zone (HRZ) and above the
Walakpa Sandstone, within a thick sequence of marine shales, claystones, and thin, silty
sandstones. The most likely areas that will accept injected waste are the approximately
six to eight thin beds of silty sandstone occurring between 1,450 and 1,700 feet TVDss.
These beds range from about 1 to 6 feet thick, and the total package is about 200 feet
thick. These sandstones are separated by numerous claystone, siltstone, and shale beds
that will provide confinement for injection wastes. There are no commercial
hydrocarbon intervals in this section.
The whole package is overlain by the laterally extensive, impermeable shales and
carbonaceous claystones of the HRZ. The HRZ is over 20 feet thick in this area and so,
is sufficiently thick to provide confinement, ensuring that none of the injected waste
fluids migrate upward. A roughly 10 foot thick, laterally extensive shale below the
targeted injection zone (above the Walakpa Sandstone) provides basal confinement for
injected fluid waste. The Walakpa Sandstone is not a producing interval in the Barrow
Gas Field.
The attached South Barrow #18 well log, used as a type log for E.B. #21 (paper copy of
East Barrow #21 log is also attached) shows the geology from above the 9 -5/8" casing
shoe down through the Barrow Sandstone. The interval open for annular injection is
highlighted in yellow. The zone most likely to accept injection is highlighted in red.
Cement around the 7" intermediate casing string is shown in brown. The HRZ, the upper
confining zone, is found above the 9 -5/8" casing shoe, and the lower confining zone, the
shale above the Walakpa Sandstone, is near the 1,700 foot TVDss depth.
The geology of the East Barrow gas field is well understood due to good well control,
core and log data, and 2 -D seismic. Reservoir properties and the lateral continuity of
reservoir sands are well documented. Faulting is minor in the field, and the reservoir
structure is relatively uncomplicated.
111 41_
• , l 8;
fll
ru 1 I I e
1 - , I 1
'
' 4_1__t_l_j
. '
I : it __ , _ .. ....: I . _. _ . . .1- _t_ . t ., -1.
i -t , : ,: --' -1 .--, ;-
.1 1 li t
.. _. _ _ _ --- i L I,
..,,
- 1 I
_
, , i F_
1. , _
1 1
,,
- i
I
I 1 1
1 I
W f4., , . _ ., — _ _ _ _ _ . •
-' ....'.. NI = - ari f • .‘. y
i = I : :::! i'I . t__ _ . __ __ . _ .. _ ,_. .. __IP__ _
- .-- - 7 7 - 7 --7 - 1 - 7 -- _.7 .1 - :
I. fl 1 .
0 2 .
.t
. .. 1
- i 1
-- ---t i I
ft ', ' ... • i : i . P . - • -'! p. '.. ,, .
-
1;4 I , , , ,11,t a , ‘ 4.1$ . t • i ,. t .II% + ' x k' "',I
a; t -: •-, - =I __ iti.. • i T ' L k t Y ; _IF . ': - 111 . 14- .6. r ,..: i . i _ - 1 44 ilk1 tr4.J.__Ili ii! 4 4, 6" . ,' - '',I.... - i'' ":
1, _ ... ii c fili p 1
t
__.
- i i 1- ■
6, •
—AA I 4, • ' o. I
1 1 i i 1
_ h i
. ,
I gilt - _--1- - -- ,.:
- 1 --4 -- -
•
0
5 NI N • l l ■ • '-
I 14t - r i I t -.1 •
41 .. _ , I
I 1 I I - - - f --. - 1 -! ■ !
I ,
il ._'''' _ .11 ■ 1 ! I
■ , - 1du 4.
21 1 I _V ,...... iF r -4 -1- r • ,
.4
(1 ) ,.... . ,
0 1 5 0 0 0 1 0 0 0 1 0 1 ) 0
1 (: ,5 1 3 i t 6 . i. ,
" . ,.: B
1
_
,., N 6) ( ) •
D i „Tr
In 1 -1- I 7 LI
.- rkil
i„
( t k •to P • 4 _ < I HI li
•';';
)1•1 t i. ill
_ _ _.. —
_
.7.)
tr3 ril4 . .
f _f l • 1 ,_,. 1,- 4
. . i! I 1 1 ' 11, - 2 - - - • — 4 r. AfvV
, 1 _ l \ 164 \farTne II
ft In 4 •
i 4 , '1 I , ---4- , -. --
z 6 —
— tr) I.
' ' t
-• 0
-. W i I I l - ' - . I - I ■ '
3 tH Dr. .kr. T. f8 0 1 • • 1 I 1 -
.L. j. [ ■ ■ ' 1 i _
LL
Ii - 1
• • _ ...__. .„..
0 •
East Barrow #21
(S. B. #18 type log)
Cora _,, ResstMty • fogs
ivG:)S: SR I RT RHOB
0 000 GAP! 150 1 OHMM 200 1 65 G /C3 2 -6
SP LLD _ tiPHI
50 MV -1501 OHMM 201160 — V/V — — —
CALI rwa(WA) DT
a6 000 Mi 16 00010,1 20 150.000 USir 50 C '
.
HR Z Mill
rase HRZ
19011 , 9- 5 /8csg
?d50
l
l
15<7,0 ---
3 —
1550
r
r c
f c
c
c
as
hen s4 f Q Annul. dis•osal _
r ° target , terval _,
{ _ 1
1 650
1700 c
LCU <
1750 4 .
I
CU
1850 3 U
1900
i I Barrovr as , ` 1'
19Th �
3 Barrow s t f ,_,._ -._ __..�. .. ....
S
2I 9
L Barrow as
R a4 HNrrp Vr --- - _- _ .______ - — ��
Mud Csg./ Cmt. s Hole Size Scale: 1 "= 250' .,. _
Cmt to surf. .. 18" % � : / 133/ @ 69' do
- • - 0
... ...- - . - - :r
. .
qi o - ; Pack
40 �, / Arctic c
-
0 0 �
y r
MI z 121 j : 1
-ri In
Z ` Permafrost -- :;
3 Base = 924' /..". -
;0
•
i •
- - - - _ - - - / .. : • f/
.. - - - •. .f
• 0
E •
- Y ' @ 1433'
3 w Cn Mud Spacer
l i 1 O f o U)_ a
3 + ° i 8 § 8 - - y� 81"
in ow av
. 1 a i > rs _ CI 1
- d
_. o
F-- 0 g w N AU -,
a) i . 7" @ 2200'
O U
U O W a
_t Imo/ / /,,• PBTD = 2160'
TD = 2200'
NORTH SLOPE BOROUGH sheet no
protect Barrow Gas Field Development by WWA
location E.B. #21 date 8/12/90
\ si Drilling Prognosis checked project no
date
STATE OF ALASKA
ALASKA C ND GAS CONSERVATION CC IISSION
PERMIT TO DRILL
20 AAC 25.005
la. Type of work Drill =x Redrill 2. lb. Type of well. Exploratory 2 Stratigraphic Test C Development Oil
Re -Entry - Deepen 0 Service - Developement Gas ,X Single Zone 0 Multiple Zone
2. Name of Operator 5. Datum Elevation (DF or KB) 10. Field and Pool
North Slope Borough /Barrow Gas Fields 19' KB feet East Field
3. Address 6. Property Designation
P.O. Box 1120, Barrow, Ak. 99723 NSB.FEt. . East Barrow Gas Field
4. Location of well at surface - 7. Unit or property Name 11. Type Bond (see 20 AAC 25.025)
332' FSL, 459! FWL Sec. 24, T22N, R17W,
East Barrow
At top of productive interval U.M. 8. Well number Number CD 17430
as above E.B. #21
At total depth 9. Approximate spud date Amount
as above October 1, 1990 200,000
12. Distance to nearest 13. Distance to nearest well 14. Number of acres in property 15. Proposed depth (MD and TM
property line
approx. 11,200 ' feet 2036' feet 21,120 2200' KB feet
16. To be completed for deviated wells n/a 17. Anticipated pressure (see 20 AAC 25.035 (eat)
Kickoff depth feet Maximum hole angle a Maximum surface 1000 psis) At total depth (IVs)) 1050 psi0
18. Casing program Setting Depth
size Specifications Top Bottom Quantity of cement
Hole Casing Weight Grade Coupling Length MD TVD MD TVD (include stage data)
18" 13 3/8" 72# S -95 8rd 60" 0 69' 11 Sx Permafrost
12 1/4" 9 5/8" 40# N -80 8rd 1424' 0 1433' 934 Sx Permafrost
8 1/2" 7" 23# N -80 8rd 2191' 0 2200' 83 Sx Class G
19. To be completed for Redrill, Re- entry, and Deepen Operations.
Present well condition summary
Total depth: measured feet Plugs (measured)
true vertical feet
Effective depth: measured feet Junk (measured)
true vertical feet
Casing Length Size Cemented Measured depth True Vertical depth
Structural
Conductor REIVED
Surface
Intermediate .AUG L 1, . .1 4 ;
Production
0w Old, uas i,uns, Lromfi$sj
Liner _
Perforation depth: measured H)rchorag9
true vertical
20. Attachments Filing fee ❑ Property plat RI BOP Sketch I2 Diverter Sketch Drilling program x'
Drilling fluid program ❑X Time vs depth plot ❑ Refraction analysis ❑ Seabed report ❑ 20 AAC 25.050 requirements ❑
21. I hereby certify that the foregoing Is true and correct to the best of my knowledge
Signed a/ �� eg�—r , � /' Title !�crmors Eivtv/v4 Date 6/13/90
Commission Use Only
Permit Number API number Approval date See cover letter
QO _ // a , 50_ c 3 - A coA 7 09/10/90 for other requirements
Conditions of approval Samples required 0 Yes $ No Mud log required ❑ Ye No
Hydrogen sulfide measures 0 Yes I No Directional survey required 0 Yes N d�
Required working pressure for BOPE 91.2M; ❑ 3M; ❑ 5M; ❑ 10M; ❑ 15M
Other:
��*�� by order of
Approved' ��� Commissioner th c ommission Date
9tit1 9
Form 10 -401 Rev. 12-1-85 Submit in triplicate
0 0
NORTH SLOPE BOROUGH
DEPARTMENT OF INDUSTRIAL DEVELOPMENT
Barrow Gas Development Daily Drilling Report ALASKA
WELL NAME: *a/ DATE: /� /�� / RIG DAYS:
FORMATION: DEPTH: FOOTAGE
/64 /A , Last 24 Hrs.
WEATHER: Wind: Temp.: Visibility:
From To Hrs. DAILY OPERATIONS
® e0Z 'Ar j 7 �l /7))i) •_9.3 90? " N 4» 1.1117776:5.5 T 21 0 /ifi., a'9'.s'13 / t/1 () L.L,)..4 /7Y /,��/iyr 9
c , / /4i * Ale ,-SE�'✓i(F iii
( Pie Mir 41 .Ril ii Tn ..v ,C7:n.)r /0)/10- _ .1 .171 2/P - / o�c41 9 N
Aga" /4 2._ ,'i if,/, p/! 10 ✓, „pAmp! , J-iG . 01- d `W ...i t ..0 rr+ .Ci»i G /.4:#1-.40 . ,. ' ' )6' / C. t�E%✓li ti )r 9 98 " G_ Lz6 _..4,e ";--.....41A,=-7,--, e trr. ,
/ (-,rr /i0" . I /7i' el, , C�r�s r
l7eW .9p 7 .9 Tip Cz'r .JR./_ /.�79. -fc- 1%n ~ " f. /pc f/ 4I, .94 f.',J 67/ 4 ings
p1/DJ - I l )OG � f / /'r � .l_ /2a / .-rF.e_.. / /
I
DIESEL ON LOC.: DIESEL USED: DIESEL RECD: H ON LOC.: H USED:
— DEVIATION I Background Gas Units Trip Gas Units I Connection Gas Units
Depth Degrees DIRECTION Depth Degrees DIRECTION Depth Degrees DIRECTION
MUD PROPERTIES: Type _. I DAILY MUD COST CUM. MUD COST
WEIGHT VISC. PV Y P GELS pH A.P.I.WL HTHP FILTER Pm Pi CHLO- Sand SOLIDS OIL
(PPG) (SEC.) (CP) (CC) W.L. CAKE RIDES % %
BIT SIZE MFG. TYPE SERIAL NO. JET SIZE DEPTH FTG. HRS. FTIHR. BIT WT. ROT. CONDITION
NO. 32ND IN OUT (MLBS.) RPM T B G
HYDRAULICS LINER SIZE STROKE SPM GPM PUMP JET AV DP
LENGTH PRESSURE VELOCITY D C
PUMPS /
CASING SIZE WT. GRADE I SHOE FRAC. GRAD. PPG AT FT. TOL
— BHA
OFF BOTTOM ROT. WT. S.O. WT. _ P.U. WT. B.H.A. LENGTH _ B.H.A. WT.
,__ DAYS ON JARS NO..___ BOP Texted: _ _
SERV. PERSONNEL
DAILY COST I CUM. COST RIG SUPERVISOR
•
NORTH SLOPE BOROUGH
DEPARTMENT OF INDUSTRIAL DEVELOPMENT
Barrow Gas Development Daily Drilling Report ALASKA
•
_ WELL NAME: g /2 .x3 a I / DATE: `�./(�7O RIG DAYS:
FOO
FORMATION: b QC 7 ' , dw . 404. DEPTH: J t16D Last 24
Hrs.
WEATHER: Wind: Temp.: Visibility:
From To Hrs. // DAILY OPERATIONS
Moo ,OD.30 P3 ( 041 iio; s f eot c /01y L1 .
Oo t'bp (% R/ vP fn Bee n CQSr . (AQ . ovf /,oe rotes fb 7 1 _ 1 4 1 /N1 1 1,-
07003 O93a 2%.2 l'irrt.i1Se. aim/rordi /ion mi./ I/J/ oet X 10/` cP.ar474�4Paat
_" O4311 J2C() . 02 f r; /e r Qc/ e g .
LSO 1331) /%Z ( tia s.� 2r/ filar'" s a' s Z/o ss 6 �°'n#'47"-
)33 0 /73b 4/ li,, 4. C
1730 /SOD /1/2. fp,r or. 1-- B./J.Ps SRI' s 40.5.
DIESEL ON LOC.: DIESEL USED: DIESEL RECD: H ON LOC.: H USED:
DEVIATION Background Gas Units Trip Gas Units Connection Gas Units
Depth Degrees DIRECTION Depth Degrees DIRECTION Depth Degrees DIRECTION
MUD PROPERTIES: Type DAILY MUD COST CUM. MUD COST
WEIGHT VISC. PV A.P.I.WL HTHP FILTER CHLO- Sand SOLIDS OIL
'°" (PPG) (SEC.) (CP) Y P GELS pH (CC) W.L. CAKE Pm Pt RIDES % % %
BIT SIZE MFG. TYPE SERIAL NO. JET SIZE . DEPTH FTG. HRS. FT.INR. BIT WT` ROT. CONDITION
NO. 32ND IN OUT (MLBS.) RPM T B G
�, 7 "CS G. w ,
HYDRAULICS LINER SIZE STROKE SPM GPM PUMP JET AV DP ,
LE y/
LENGTH � PRESSURE VELOCITY DC
�_ PUMPS .5 -Y.. 2 _ /6 ..L.Z�/' J ' / .2ao /
CASING I SIZE '' WT I GRADE SHOE FRAC. GRAD. PPG AT FT. TOL
.— BHA
OFF BOTTOM ROT. tNT S.O. WT. P.U. WT. B.H.A. LENGTH _ _ B.H.A. WT.
DAYS ON JARS NO. __ __ BOP Texted: __
SERV. PERSONNEL
DAILY COST CUM. COST RIG SUPERVISOR
•
RETAIN THIS SECTION FOR YOUR RECORDS
RE EB-21
DLL BHC /AL � PRINTS NEG. 1 SEPIA
CD /CNL NOV 1 5 19 t PRINTS NEG. 1 SEPIA
PROLOG PRINTS NEG. 1 SEPIA
ACBL / VDL -S A IdSkS Vi & co tS:-1 � t NEG. 1 SEPIA
GAMMA RAY PRINTS NEG. 1 SEPIA
PRINTS NEG. SEPIA
PRINTS NEG. SEPIA
ABOVE RECEIVED FROM: ATLAS WIRELINE
ATTENTION State / of Alaska
SIGNED_LJ, -.— DATE 19
. I
AOGCC GEOLOGICAL MATERIALS ERIALS iNVEN T ORY LIST
PERMIT 8 90 -- //).. WELL NAME E, e Q ).ro 44t 0 7/
COMPLETION DATE // 1 8 P 7 C O, CONTACT A nrjfi S /gyp 'o�-a �4
check off or list data as it is received, *list received date for 407. if not required list as NR
407 1 * /. ti! /qc drilling history ,/ •survey L IR! well tests ,rR 1 core descriptioi vvi
cored intervals core analysis A A dry ditch intervals digital data
1
I 0 s �w 1 h . ,.f. Sw ry y w/ 1sfyr
J
I LOG TYPE R UN INTERVALS SCALE
LD L/c ��y 1 NO. [to the nearest foot) (inch /100']
.via -' ./ .J . 2)
WC /tic /9t / '' 6 3 1 G DA/A/I / ,/i -- 02 /5-,r- kS-'
41)
/ A /275- S
'kW- ( f"'Ttj J4 y 1,r) / / 90 e -- c, /"/ o ' �
,9c r Cyr j situ / i / / Stto - aia o
7)
8)
1
91
10)
111
12)
131 I
141
15) 1
16) 1
17)
10)
•
Note to File
EAST BARROW 21 (PTD 1901120)
June 21, 2011
Re: North Slope Borough's Application for Sundry Approval for Annular Disposal of Drilling
Wastes within Well East Barrow 21
Request
ConocoPhillips requests approval to dispose of waste fluids generated through drilling operations by
injection into the 9 -5/8" x 7" annulus within well East Barrow 21.
Recommendation
Approve North Slope Borough's request.
Conclusions
1. The 9 -5/8" surface casing shoe is set in this well at about 1,431'' (- 1,408' true vertical depth subsea,
or "TVDSS "), in a mudstone and siltstone interval that lies below the laterally- extensive HRZ shale,
which is 30' to 40' thick in this area. This shale will provide confinement to prevent upward
migration of injected waste.
2. There appears to be a sufficient volume of silty sandstone and sandy siltstone open to the annulus
surrounding the 7" casing within this well to accept the proposed injected fluids.
3. Lower confinement will be provided by a 10 -foot thick, laterally- extensive mudstone layer this is
sufficiently thick and laterally persistent to ensure injected materials remain within the target disposal
interval.
4. There are no potential USDWs in this area.
5. Correlative rights will be protected.
6. The proposed disposal injection operations will not affect potential oil or gas reservoirs.
7. The area most strongly impacted by the proposed annular disposal activities will be limited to a radius
of less than 150' from the wellbore.
Discussion
The North Slope Borough's application was reviewed along with logs from the South Barrow 12, 15, 18
and 19 wells and from the East Barrow 21 well. The mud logs from South Barrow 12, 15 and 18 were
also reviewed. An index map is provided in Figure 1, below.
The East Barrow 21 development well was drilled to the East Barrow Gas Pool. The North Slope
Borough, the operator, intends to dispose of drilling wastes utilizing an open annulus within East Barrow
21 that extends downward from the 9 -5/8" surface casing shoe, which is set at about 1,431' (- 1,408'
TVDSS), to the top of cement for the 7" casing string, which is estimated to lie at about 1,725' ( -1,700
TVDSS). This annulus lies within Section 24 of T22N, R17W, Umiat Meridian (see Figure 1). The East
Barrow Gas Pool lies on North Slope Borough fee acreage, so correlative rights are not an issue.
The section of annulus in East Barrow 21 that will most likely accept the injected waste fluids (most
likely receptor interval) is a 200 -foot thick section of the Jurassic -aged Kingak Shale (see Figure 2,
All depths herein represent measured depths unless otherwise specified.
2 All thicknesses represent true vertical thicknesses unless otherwise specified.
• •
East Barrow 21 June 21, 2011
Note to File Page 2 of 5
below). This interval contains numerous 1- to 6 -foot thick beds of sandstone and silty sandstone that are
separated by siltstone, mudstone and shale. The aggregate stratigraphic thickness of the sandy siltstone
and silty sandstone beds exposed to the annulus is about 15'. On the well log from East Barrow 21, the
gamma ray curve suggests the presence of a thick, silty sandstone bed at the shoe of the 9 -5/8" surface
casing. This apparent silty sandstone bed is an artifact caused by circulating and cementing. In offset
wells, the correlative sediments to those surrounding the 9 -5/8" casing shoe consist of mudstone and
siltstone (see Figure 3, below).
S BARROW .
East Barrow 21
t
S BLOW 19 ,
S BARROW 12 i S BARROW 18 -,_
BARROW, 21
Area of Review b Savik 1
(shaded blue)
0 S BARROW 20 Q S BARROW 14
-�j-S "OW 17
Figure 1. Index Map
(The path of the cross - section shown on Figure 3 is highlighted with a magenta - colored line)
The 9 -5/8" surface casing shoe lies near the base of a 1,100 -foot thick interval that is dominated by
mudstone and siltstone, and beneath the HRZ shale, which is 30' to 40' thick in this area. These intervals
are continuous throughout the area, and will provide upper confinement for the disposed fluids. Beneath
the most likely receptor interval is a 10 -foot thick siltstone interval that is also continuous throughout the
area. This interval will provide additional lower confinement for injected wastes.
Extrapolation of temperature log information recorded in the nearby South Barrow 20 well indicates that
the base of permafrost lies about 800' below ground level, or about -770' TVDSS, which is about 600'
shallower than the top of the likely receptor interval.
• •
East Barrow 21 June 21, 2011
Note to File Page 3 of 5
: :::::
°
-- , - - - --M►
ql iC lSimemR6!!lilsum!✓•3tlL^aseeanliilE."JYJ
_ _ ? ._may - a" r
1- 111 y j , ° r I dtl. FliMrl -!'
Most Likely , . 1 4? . ILap,pr,._,
Receptor ? ter– . - „ j ir-- .
1 . Interva f or c 1— . “
Disposed { ..
Fluids {
Lower --- ----4.
1 , .:::
Confining
Strata ...
r
_ F
•
1 ° , .:..:,
Figure 2. East Barrow 21 Well Log Displaying Affected Intervals
South Barrow 18, which lies about 900' to the east - northeast of East Barrow 21, is the nearest well that
was mud logged. In South Barrow 18, methane was first encountered in significant at amounts at about
360' ( -330' TVDSS). Log analysis calculations for the sands within the most likely receptor interval
yield water saturation values ranging from about 95% to 80 %, and these water saturation values are
supported by Pickett and Hingle plots. Sands within the most likely receptor interval are silty, fine- to
very fine- grained, and displayed trace indicators of small amounts of immobile, residual oil. The most
likely receptor interval does not contain commercial quantities of oil or gas.
' The lithology log from nearby well South Barrow 18 describes these sands as displaying gold fluorescence under UV
light, with instant, light - yellow, streaming cut using solvent, but with no mention of oil staining in the cuttings samples. These
occurrences are judged to represent small amounts of immobile, residual oil.
• •
East Barrow 21 June 21, 2011
Note to File Page 4 of 5
1000410 1000350 1901120 1000460
W 500232001200 500232000600 500232002700 500232001700
4 1368 ft 4 2231 6 4 921 6
N S BOROUGH N S BOROUGH N S BOROUGH N S BOROUGH
S BARROW 19 S BARROW 12 E BARROW 21 S BARROW 18
1320 FSL 1320 FEL 23 FSL 1755 FEL 332 FSL 459 FWL 660 FSL 1320 FWL
TWP: 22 N - Range: 17 W - Sec. 23 TWP: 22 N - Range: 17 W - Sec. 23 TW P: 22 N - Range: 17 W - Sec. 24 TWP: 22 N - Range: 17 W - Sec. 24
'. - .. 7 > '° > - - 1500
1500
1000 ,. - > - > 1000
> Upper .. -
Confining _ - 9 -5/8" Casing Shoe
500 M Strata — - 500 •
l�
-- Most Likell; � � _
s 1 Receptor
a Interval 0.
- a fim
Lower „ 1
__ - onn' ���� Ma
Strata }� r '
i s
' : 4 . 'TD =2135
TD =2160 Soo
- 500 - 1 z ... _ s -
TD 2300 TD =2287
Figure 3. Structural Cross - section from S Barrow 19 to S Barrow 18
Well log calculations indicate that the total dissolved solids (TDS) concentrations exceed 10,000
mg/1 in the sands of the most likely receptor interval and the scattered, silty sands that lie
between the receptor interval and the base of permafrost.
The chart presented in Figure 4, below, provides an estimate of the subsurface volume around East
Barrow 21 that will be affected by the proposed annular disposal operations. There are about 15' of
porous sandy siltstone and silty sandstone beds within the likely waste receptor interval, according to a
count using the gamma ray curve from East Barrow 21. Neutron and density porosity well logs were run
across the most likely receptor interval, and inspection of these well logs suggests an average porosity of
about 20% for the sandy siltstone and silty sandstone layers. Based on these values, the proposed annular 1
injection activities will directly affect the receptor beds only to a radius of about 150' from the wellbore,
as indicated in the chart below.
4 Calculation techniques used are compatible with EPA guidance document "Survey of Methods to Determine Total
Dissolved Solids Concentrations," (EPA LOE Contract No. 68 -03 -3416, Work Assignment No. 1 -0 -13, KEDA
Project No. 30 -956, September 1988, Revised September 1989).
4,
• •
East Barrow 21 June 21, 2011
Note to File Page 5 of 5
Injected Fluid vs Affected Radial Distance
East Barrow 21 Wellbore
(assumes 15' aggregate injection zone thickness and 20% porosity)
300 --
250
a
m
200
E
0
F • 150
ezi Q _
l0
• 100
cc
0
Q • 50
0
0 5,000 10,000 15,000 20,000 25,000 30,000 35,000
Amount of Injected Fluid (barrels)
Figure 4. Radial Distance Potentially Impacted by East Barrow 21 Annular Disposal
Summary
The limited volume of rock that will be affected by this proposed disposal injection program likely
contains some gas, is situated beneath about 800' of permafrost, and is bounded above and below by
continuous confining layers. There are no freshwater aquifers present, nor are there any potentially
commercial hydrocarbons within the proposed injection interval in well East Barrow 21. The open
annulus that will be used for disposal injection lies on fee land owned by the North Slope Borough, so
correlative rights are not a concern.
I recommend approval of this annular disposal project.
Steve Davies
Senior Petroleum Geologist
Note to File
July 12, 2011
Well:
East Barrow 21(PTD 190 -112)
RE:
Regarding NSB application for Sundry approval for Annular Disposal of Drilling wastes
within Well East Barrow 21
Recommendation :
Deny application
Conclusion:
East Barrow 21 meets all geological considerations for a A/D well as per Steve Davies
analysis but there is no technical proof that a FIT or LOT was done after drilling out of
the surface casing shoe. Without this data the annular disposal permit cannot be
approved. Furthermore, the OA (out annulus) has "Arctic pack " placed and this
would also make it technically impossible to inject any fluids into this annular space and
down to the targeted receiving formations. Arctic pack could be removed with
considerable effort but would not be practical. My recommendation is too look for
another well or permit one of the new wells to AD service. (Savik #1 or Savik #2) .
Guy Schwartz /
7
S
" ye
eZor troleum Engineer.
' frfri--7
THE MATERIAL UNDER THIS COVER HAS BEEN
MICROFILMED
ON OR BEFORE
OCTOBER 27 2000
P
M
E
E
L E W
A T E R IA L U N D ER
TH IS M ARK ER
STATE OF ALASKA ~-'
AL~._,~A OIL AND GAS CONSERVATIO, .-CL ,:.!MISSION
WELL COMPLETION OR RECOMPLETION REPORT AND LOG
1. Status of Well Classification of Serwce Well
OIL ~'~ GAS [~ SUSPENDED ~_1 ABANDONED ,.-'1 SERVICE [~]
2 Name of Operator 't['~'Al iqJb~ 7. Permit Number
North Slope Borough VE~IFIF..i} 90-112
3. Address~SU __-._. 8. APl Number
" j vuM?,..zl,ul'~ I 9. Unit or Lease Name
4. Location of well at surface 17 ~ Pi;IR,
332' FSL, 459' FWL Sec. 24, T22N, RT~iW, U.M. !_/~/~7~._J East Barrow
At Top Producing Interval ~ ..~ --VERIFI'~D i 10. Well Number
At Total Depth .............. '"~ 11. Field and Pool
same East Field
5. Elevation in feet (indicate KB, DF, etc.) I 6. Lease Designation and Serial No. East Ba_~-~ow Ba_T~OW Gas
235 ' K.B.[ Field
,,
12. Date Spudded 13. Date T.D. Reached 14. Date Comp., Susp. or Aband. 115. Water Depth, if offshore 116. No. of Completions
10-21-90 11-02-90i N/A feet MSt
17. Total Depth (MD+TVD)18.PlugBackDepth(MD+TVO)19. Directional SurveY2160 ' KB MD 2118 ' KB MD YES [] NO [] !20' Depth where SSSV setN/A feet MD I21'Thickness °f Permafr°s'924 ' KB
-22. Type Electric or Other Logs Run
·
CNL-CDL-GR, DLL-GR, BHC Sonic-Cai GR, CBL-CCL-GR
,..
23. CASING, LINER AND CEMENTING RECORD
,,
SETTING DEPTH MD
CASING SIZE WT. PER FT. GRADE TOP BOTTOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED
13 3/8" 72 S-95 .Surface '59" 18" 121 sx Perm. none
9 5/8" 53.5 N-80 Surface 1431' 12 1/4" 666 sx Perm. none
7" 23 N-80 Surface 2160' 8 1/2" 105 sx Class G none
24. Perforations open to Production (MD+TVD of Top and Bottom and 25. TUBING RECORD
interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD)
,, ,
1976-1984' 8' 2 3/8" 4.7#J-55 1935'
1988-1990 ' 2 '
1991-2006 ' 15 ' 26. ACID, FRACTURE, CEMENTSQUEEZE, ETC.
2008-2011 ' 3 ' DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED
-
2014-2016 ' 2 '
2033-2039 ' 6 '
._
2042- 2048 ' 6 '
~' ~ 6 SPF=252. 0.48" T)ia. shots.
27. PRODUCTION TEST
Date First Production I Method of Operation (Flowing, gas lift, etc.)
11 - 13 -90I Flowing
Date of Test Hours Tested PRoDUcTION FOR OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE 1 G~S-OIL RATIo
11-24-90 12 TEST PERIOD ~ 800MSCFD 14/64~~
Flow Tubing Casing Pressure CALCULATED OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-APl (c~rr)
Pre-. 782 786 24-HOUR RATE I~ 800MSCFD N/A
"28.'. CORE DATA
Brief description of lithol°gy, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chil~.
none ~'" RE¢.'EIVED
DEC 1 4 1990
Alaska 0il & Gas Cons.
Anchorage
Form 10-407 Submit in duplicate
Rev. 7-1-80 CONTINUED ON REVERSE SIDE
29.
GEOLOGIC MARKERS
NAME
Permafrost
Upper Barrow
SS
Lcwer Barrow
SS
MEAS. DEPTH
924'
1744
1940
2036'
TRUE VERT. DEPTH
924'
1744
1940
2036'
30.
FOH,v, ATI(}N 'rESTS
Include interval tested, pressure data, all fluids recovered and gravity,
GOR, and time of each ahase.
No DST ' s
31. LIST OF ATTACHMENTS
Single Sho'~ Surveys, Well History
32. I hereby certify that the foregoing is true and correct to the best of my knowledge
Title Petrolum Engineer Date 11-28-90
INSTRUCTIONS
General' This form is designed for submitting a complete and correct well completion report and log on
all types of lands and leases in Alaska.
Item 1' Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt
water disposal, water supply for injection, observation, injection for in-situ combustion.
Item 5' Indicate which elevation is used as reference (where not otherwise shown) for depth measurements
given in other spaces on this form and in any attachments.
Item 16 and 24: If this well is completed for separate production from more than one interval (multiple
completion), $o state in item 16, and in item 24 show the producing intervals for only the interval reported
in item 27. Submit a separate form for each additional interval to be separately produced, showing the
data pertinent to such interval.
Item 21' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.).
Item 23' Attached supplemental records for this well should show the details of any multiple stage cement-
lng and the location of the cementing tool.
Item 27' Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In-
jection, Gas Injection, Shut-in, Other-explain.
Item 28: If no cores taken, indicate "none".
Form 10-407
BARROW GAS FIELD
EB #21
TOTCO Single Shot Survey
Measured Depth, ft
100
333
421
482
545
607
733
1075
1168
1231
1262
1448
1458
1550
1703
1859
2160
Anchorage
Deviation, Degrees
3/4
1
2 1/2
i 3/4
3
2 7/8
3
4 1/2
3 1/2
2 1/2
2 3/4
i 1/4
NORTH SLOPE BOROUGH
DEPARTMENT OF INDUSTRIAL DEVELOPMENT
Barrow Gas Development Daily Drilling Report ALASKA
FOOTAGE
FORMATION: DEPTH: ¢¢ Last 24 Hrs.
WEATHER: Wind: Temp.: Visibility:
From To Hrs. DAILY OPERATIONS
R,.CCEiV£D
DEC 1 4 ]990
DEVIATION I Background Gas Units [ Trip Gas Units Connection Gas Units
Depth Degrees DIRECTION Depth Degrees DIRECTION Depth Degrees DIRECTION
MUD PROPERTIES: Type I DAILY MUD COST CUM. MUD COST
WEIGHT VlSC. PV A.P.I.WL HTHP FILTER CHLO- Sand SOLIDS OIL
(PPG) (SEC.) (CP) Y P GELS pH (CC) W.L. CAKE Pm Pi RIDES %
BIT JET SIZE DEPTH ROT. CONDITION
NO. SIZE MFG. TYPE SERIAL NO. FTC. HRS. FT. IHR. BIT WT.
32ND IN OUT (MLBS.) RPM T B G
I
HYDRAULICS LINER SIZE STROKE SPM GPM PUMP JET AV DP/Dc
LI=NGTH PRESSURE VELOCITY
PUMPS /
CASING ISIZE IWT. I GRADE [ SHOE FRAC. GRAD. PPGAT FT. [ TeL
BHA
OFF BOTTOM ROT. WT. S.C. WT. RU. WT. B.H.A. LENGTH B.H.A. WT.
DAYS ON JARS NO. BOP Texted:
SERV. PERSONNEL
NORTH SLOPE BOROUGH
DEPARTMENT OF INDUSTRIAL DEVELOPMENT
Barrow Gas Development Daily Drilling Report ALASKA
FOOTAGE
FORMATION: DEPTH: Last 24 Hrs.
WEATHER: Wind: Temp.: Visibility:
From To Hrs. DAILY OPERATIONS
Depth Deg roes DIRECTION Depth Dog rees DI R ECTION Depth Degrees DI R ECTIO N
MUD PROPERTIES: Type I DAILY MUD COST CUM. MUD COST
WEIGHT VISC. PV A.P.I.WL HTHP FILTER CHLO- Sand SOLIDS OIL
(PPG) (SEC.) (CP) Y P GELS pH (CC) W.L. CAKE Pm Pi RIDES % % O/o
BIT JET SIZE DEPTH BIT WT. ROT. CONDITION
SIZE MFG. TYPE SERIAL NO. FTC. HRS. FT. IHR.
NO. 32ND IN OUT (MLBS.) RPM T B G
HYDRAULICS LINER SIZE STROKE PUMP JET AV DP/Dc
LENGTH SPM GPM PRESSURE VELOCITY
PUMPS /
OFF BOTTOM ROT. WT. S.C. WT. P.U. WT. B.H.A. LENGTH B.H.A. WT.
DAYS ON JARS NO. BOP Texted:
SERV. PERSONNEL
NORTH SLOPE BOROUGH
DEPARTMENT OF INDUSTRIAL DEVELOPMENT
B~,rro,,,, G,~s Deve~opm~,r,t Daily Drillin9 Report ALASKA
FOOTAGE
FORMATION: DEPTH: Last 24 Hrs.
WEATHER: Wind: Temp.: Visibility:
From To Hrs. DAILY OPERATIONS
Depth Degrees DIRECTION Depth Degrees DIRECTION Depth Degrees DIRECTION
MUD PROPERTIES: Type I DAILY MUD COST CUM. MUD COST
WEIGHT VISC. PV A.P.I.WL HTHP FILTER CHLO- Sand SOLIDS OIL
(PPG) (SEC.) (CP) Y P GELS pH (CC) W.L. CAKE Pm Pi RIDES % % %
BIT JET SIZE DEPTH BIT WT. ROT. CONDITION
SIZE MFG. TYPE SERIAL NO. FTC. HRS. FT. IH R.
NO. 32ND IN OUT (MLBS.) RPM T B G
I I
HYDRAULICS LINER SIZE STROKE SPM GPM PUMP JET AV DP/Dc
LENGTH PRESSURE VELOCITY
PUMPS /
BHA
OFF BOTTOM ROT. WT. S.O. WT. P,U. WT. B.H.A. LENGTH B.H.A. WT.
DAYS ON JARS NO. BOP Texted:
SERV. PERSONNEL
DALLY COST I CUM. COST IRIG I SUPERVISOR
NORTH SLOPE BOROUGH
DEPARTMENT OF INDUSTRIAL DEVELOPMENT
Barrow Gas Development Daily Drilling Report ALASKA
FOOTAGE
FORMATION: DEPTH: Last 24 Hrs.
WEATHER: Wind: Temp.: Visibility:
From To Hrs. DAILY OPERATIONS
Depth Degrees DIRECTION Depth Degrees DIRECTION Depth Degrees DIRECTION
MUD PROPERTIES: Type I DAILY MUD COST CUM. MUD COST
WEIGHT VISC. PV A. RI.WL HTHP FILTER CHLO- Sand SOLIDS OIL
(PPG) (SEC.) (CP) Y P GELS pH (CC) W.L. CAKE Pm Pi RIDES
BIT JET SIZE DEPTH BIT WT. ROT. CONDITION
NO. SIZE MFG. TYPE SERIAL NO. 32ND IN OUT FTC. HRS. FT. IHR. (MLBS.) RPM T B G
HYDRAULICS LINER SIZE STROKE SPM GPM PUMP JET AV DP/Dc
LENGTH PRESSURE VELOCITY
PUMPS /
BHA
OFF BOTTOM ROT. WT. S.O. WT. RU. WT. B.H.A, LENGTH B.H.A. WT.
DAYS ON JARS NO. BOP Texted:
SERV. PERSONNEL
NORTH SLOPE BOROUGH
DEPARTMENT OF INDUSTRIAL DEVELOPMENT
Barrow Gas Development Daily Drilling Report ALASKA
/ '/ FOO~GE
FORMATION: DEPTH' LastS24 Hrs.
WEATHER: Wind: Temp.: Visibility:
From To Hrs. DAILY OPERATIONS
D~ESE' ON LOC.: D~ESEL USED: [ D~ESEL REC'O: I H20 ON LOC.' I H20 USED:
DEVIATION I Background Gas Units [ Trip Gas Units Connection Gas Units
Depth Degrees DIRECTION Depth Degrees DI R ECTION Depth Degrees DI R ECTIO N
MUD PROPERTIES: Type I DAILY MUD COST CUM. MUD COST
WEIGHT VISC. PV A.RI.WL HTHP FILTER CHLO- Sand SOLIDS OIL
(PPG) (SEC;.) (CP) Y P GELS pH (CC) W.L. CAKE Pm Pi RIDES % % %
BIT dET SITE DEPTH BIT WT. ROT. CONDITION
SIZE MFG. TYPE SERIAL NO. FIG. HRS. ~-I'.IH R.
NO. 32ND IN OUT (MLBS.) RPM T B G
HYDRAULICS LINER SIZE STROKE SPM GPM PUMP JET DP/DC
LENGTH PRESSURE VELOCITY AV
PUMPS /
CASING JSIZE IVVT. I GRADE I SHOE FRAC. GRAD. PPGAT FT. I TOL
BHA
OFF BOTTOM ROT. WT. S.O. WT. P.U. WT. B.H.A. LENGTH B.H.A, WT.
DAYS ON JARS NO. BOP Texted:
SERV. PERSONNEL
NORTH SLOPE BOROUGH
DEPARTMENT OF INDUSTRIAL DEVELOPMENT
Barrow Gas Development
Daily Drilling Report
ALASKA
WELL NAME: ~-'~,Z~ '~-:,~'/ DATE: /'/~/'~¢/~/2. RIG DAYS:
FOOTAGE
FORMATION: DEPTH: Last 24 Hrs.
WEATHER: Wind: Temp.: Visibility:
From To Hrs. DAILY OPERATIONS
DEVIATION I Background Gas Units ITripGas Units ] Connection Gas Units
Depth Degrees DIRECTION Depth Degrees DIRECTION Depth Degrees DIRECTION
MUD PROPERTIES: Type J DAILY MUD COST CUM. MUD COST
WEIGHT VlSC. PV A. Rt.WL HTHP FILTER Pm Pi CHLO- Sand SOLIDS OIL
(PPG) (SEC.) (CP) Y P GELS pH (CC) W.L. CAKE RIDES % % %
BIT JET SIZE DEPTH BIT WT. ROT. CONDITION
SIZE MFG. TYPE SERIAL NO. FTC. HRS. FT. IHR.
NO. 32ND IN OUT iMLBS.) RPM T B G
HYDRAULICS LINER SIZE STROKE SPM GPM PUMP JET DP/DC
LENGTH PRESSURE VELOCITY AV
PUMPS /
OFF BOTTOM ROT. WT. S.O. WT. P.U. WT. B.H.A. LENGTH B.H.A. WT.
DAYS ON JARS NO. BOP Texted:
SERV. PERSONNEL
NORTH SLOPE BOROUGH
DEPARTMENT OF INDUSTRIAL DEVELOPMENT
Barrow Gas Development Daily Drilling Report ALASKA
WELL NAME: ~ ?.,,~,.,~/ DATE: /,~,h/.h~ RIG DAYS:
FOOTAGE
FORMATION: DEPTH: ~.&.,-/:~ Last 24 Hrs.
WEATHER: Wind: Temp.: Visibility:
From To Hrs. DAILY OPERATIONS
/ w i - /
.
-
. _
~°/Vd ~i30 /&/Iv
~.~o ml'/~' ~j ~_~>~,p.l~v ~tPl' l~
i n,,s ni,s I Oon. o,,on
Depth Degrees DIRECTION Depth Degrees DIRECTION Depth Degrees DIRECTION
MUD PROPERTIES: T~pe ~,,.o,~ DA~Y MUD COST ~e',~)~ ~ CUM. MUD COST :97,_/
WEIGHT VISC. PV A.P.I.WL HTHP FILTER CHLO- Sand SOLIDS OIL
(PPG) (SEC.) (CP) Y P GELS pH (CC) W.L. CAKE Pm Pi RIDES % % %
BIT' JET SIZE DEPTH BIT VVT. ROT. CONDITION
NO. SIZE MFG. TYPE SERIAL NO. 32ND IN OUT FTG. HRS. FT. IHR. (MLBS.) RPM T B G
I
HYDRAULICS LINER SIZE STROKELENGTH SPM GPM PRE@suPUMP RE VELOCITY JET AV DP/Dc
BHA
OFF BOTTOM ROT. WT. S.O. WT. P,U. WT. B.H.A. LENGTH B.H,A. WT,
DAYS ON JARS NO. BOP Texted:
SERV. PERSONNEL
DALLY COST I CUM. COST IRIG I SUPERVISOR
NORTH SLOPE BOROUGH
DEPARTMENT OF INDUSTRIAL DEVELOPMENT
Barrow Gas Development Daily Drilling Report ALASKA
WELL NAME: ,~:-,~ #~,/ DATE: ,?/,~.~/,~(~ RIG DAYS:
FOOTAGE
FORMATION: DEPTH: ~;/~ Last 24 Hrs. ~/,,~'
WEATHER: Wind: Temp.: Visibility:
From To Hrs. DALLY OPERATIONS
/~4~' 07/_~ ~ .~4~/~r~w' ~'d_~/ i~/v ~
,/
· / ~
·
DIESEL ON LOC.: DIESEL USED: DIESEL REC'D: H20 ON LOC.: H20 USED:
DEVIATION I Background Gas Units ITripGas Units I Connection Gas Units
Depth Degrees DIRECTION Depth Degrees DIRECTION Depth Degrees DIRECTION
MUD PROPERTIES: Type ~'~_L/,_~ DAILY MUD COST CUM. MUD COST
WEIGHT VISC. PV A.RI.WL HTHP FILTER CHLO- Sand SOLIDS OIL
(PPG) (SEC.) (CP) Y P GELS pH (CC) W.L. CAKE Pm Pi RIDES % % %
BIT JET SIZE DEPTH BIT WT. ROT. CONDITION
NO. SIZE MFG. TYPE SERIAL NO. 32ND IN OUT FTC. HRS. FT. IHR. (MLBS.) RPM T B G
//:) /~ ~] ,J~ ~ / _ ~ ,~_~J~,~'l~,- _~ ~ q ~*~__ _ ,. __ J ~// [ I,~/' [ / '5/[ ['(,~ [[ / 0 /~- ~ .~//~. "4f/¢'~ ~ ~_,~? ~.2 1~_~.
HYDRAULICS LINER SIZE STROKE SPM GPM PUMP JET AV DP/Dc
LENGTH PRESSURE VELOCITY
BHA
OFF BOTTOM ROT. W-I-. S.O. WT. RU. WT. B.H.A. LENGTH B.H.A. WT.
DAYS ON JARS NO. BOP Texted:
SERV. PERSONNEL
DALLY COST I CUM. COST [RIG [SUPERVISOR
NORTH SLOPE BOROUGH
DEPARTMENT OF INDUSTRIAL DEVELOPMENT
Barrow Gas Development Daily Drilling Report ALASKA
WELL NAME: ,~-~ ~c2/ DATE: /~/~r~/¢~, RIG DAYS:
· FOOTAGE
FORMATION:
DEPTH:
/.,:q~.~ Last 24 Hrs.
WEATHER: Wind: Temp.: Visibility:
From To Hrs. DAILY OPERATIONS
£
DIESEL ON I'OC.: DI~tS~D: DIESEL REC'D: H20 ON LOC.: H20 USED:
DEVIATION I Background Gas Units ]TripGas Units I Connection Gas Units
Depth Degrees DI RECTIO N Depth Degrees DI R ECTIO N Depth Degrees DI R ECTION
MUD PROPERTIES: Type ~4,2~ I DAILY MUD COST CUM. MUD COST
WEIGHT VlSC. PV A. RI.WL HTHP FILTER CHLOo Sand SOLIDS OIL
(PPG) (SEC.) (CP) Y P GELS pH (CC) W.L. CAKE Pm Pi RIDES % % %
BIT ' JET SIZE DEPTH BIT WT. F~o CONDITION
NO. SIZE MFG. TYPE SERIAL NO. FTG. HRS. FT. IH R. .._T.
32ND IN OUT (MLBS.) RPM T B G
! STF~OKE SPM GPM PUMP JET AV DP/Dc
HYDRAULICS LINER SIZE LENGTH PRESSURE VELOCITY
BHA
OFF BOTTOM ROT. WT. S.O. WI'. RU. WT. B.H.A. LENGIH B.H.A. WT.
DAYS ON dARS NO. BOP Texted:
SERV. PERSONNEL
DALLY COST I CUM. COST IRIG I SUPERVISOR
NORTH SLOPE BOROUGH
DEPARTMENT OF INDUSTRIAL DEVELOPMENT
Barrow Gas Development Daily Drilling Report ALASKA
WELL NAME: ,~,~ ,~=~/ DATE: /~,,/,~x/,,/~~,~ ,,--, RIG DAYS:
FOOTAGE
FORMATION: DEPTH: /~' Last 24 Hrs. _~'~
WEATHER: Wind: Temp.: Visibility:
From To Hrs. DAILY OPERATIONS
Depth Degrees DIRECTION Depth Degrees DIRECTION Depth Degrees DIRECTION
MUD PROPERTIES: Type ~o~ ~ DAILY MUD COST CUM. MUD COST
WEIGHT VlSC. PV A.RI.WL HTHP FILTER CHLO- Sand SOLIDS OIL
(PPG) (SEC.) (CP) Y P GELS pH (CC) W.L. CAKE Pm Pi RIDES % O/o %
BIT JET SIZE DEPTH ROT. CONDITION
NO. SIZE MFG. TYPE SERIAL NO. ~G. HRS. ~.IHR. BIT ~.
32ND IN OUT (MLBS.) RPM T B G
I I I I
HYDRAULICS LINER SIZE STROKE SPM GPM PUMP JET AV DP/Dc
LENGTH PRESSU RE VELOCITY
OFF BOSOM ROT. ~. S.O. ~. RU. ~. B.H.A. LENGTH B.H.A. WT.
DAYS ON JARS NO. BOP Texted:
s,,v. ,,,so,,,,
NORTH SLOPE BOROUGH
DEPARTMENT OF INDUSTRIAL DEVELOPMENT
Barrow Gas Development Daily Drilling Report ALASKA
FORMATION: DEPTH: / "/='/'~? / FOOTAGE
Last 24 Hrs.
WEATHER: Wind: Temp.: Visibility:
From To Hrs. DAILY OPERATIONS
.
Depth Degrees DIRECTION Depth Degrees DIRECTION Depth Degrees DIRECTION
MUD PROPERTIES: Type ~ DAILY MUD COST CUM. MUD COST
I
,,
WEIGHT VlSC. PV A.RI.WL HTHP FILTER CHLO- Sand SOLIDS OIL
(PPG) (SEC.) (CP) Y P GELS pH (CC) W.L. CAKE Pm Pi RIDES % % O/o
BIT JET SIZE DEPTH BIT W% Re% CONDITION
SIZE MFG. TYPE SERIAL NO. ~G. HRS. ~.IHR.
NO. 32ND IN OUT (MLBS.) RPM T B G
HYDRAULICS LINER SIZE STROKE SPM GPM PUMP JET DP/DC
LENGTH PRESSURE VELOCITY AV
OFF BO~OM ROT. ~. S.O. WT. RU. ~. B.H.A. LENGTH B.H.A. WT.
DAYS ON JARS NO. BOP Texted:
s,,v. ,,,so,,,,
NORTH SLOPE BOROUGH
DEPARTMENT OF INDUSTRIAL DEVELOPMENT
Barrow Gas Development Daily Drilling Report ALASKA
WELL NAME: m~,~. #~/ DATE: /¢~R~4~ RIG DAYS:
FOOTAGE
FORMATION: DEPTH: /~ Last 24 Hrs. ~
WEATHER: Wind: Temp.: Visibility:
From To Hrs. DAILY OPERATIONS
DEVIATION I Background Gas Units ~ Trip Gas Units Connection Gas Units
Depth Degrees DIRECTION Depth Degrees DIRECTION Depth Degrees DIRECTION
MUD PROPERTIES: Type ~ DAILY MUD COST CUM. MUD COST
WEIGHT VlSC. PV A.RI.WL HTHP FILTER CHLO- Sand SOLIDS OIL
(PPG) (SEC.) (CP) Y P GELS pH (CC) W.L. CAKE Pm Pi RIDES O/o O/o O/o
BIT JET SIZE DEPTH ROT. CONDITION
NO. SIZE MFG. TYPE SERIAL NO. ~G. HRS. ~.IHR. BIT WT.
32ND IN OUT (MLBS.) RPM T B G
HYDRAULICS LINER SIZE STROKE SPM GPM PUMP JET AV DP/Dc
LENGTH PRESSURE VELOCITY
PUMPS ~
CASING ISIZE I~. I GRADE I SHOE FRAC. GRAD. PPGAT ~. I TeL
BHA
OFF BO~OM ROT. ~. S.O. WT. RU. ~. B.H.A. LENGTH B.H.A. WT.
DAYS ON JARS NO. BOP Texted:
SERV. PERSONNEL
NORTH SLOPE BOROUGH
DEPARTMENT OF INDUSTRIAL DEVELOPMENT
Barrow, Gas Development Daily Drilling Report ALASKA
FOOTAGE
FORMATION: DEPTH:/~ /~.~ f Last 24 Hrs.
WEATHER: Wind: Temp.: Visibility:
From To Hrs. DAILY OPERATIONS
DEVIATION I BackgrounOGas Units ITripGas Units IConnoctionGas Units
Depth Degrees DIRECTION Depth Degrees DIRECTION Depth Degrees DIRECTION
PROPERTIES: Type I DAILY MUD COST CUM. MUD COST
MUD
WEIGHT VlSC. PV A.RI.WL HTHP FILTER Pm Pi CHLO- Sand SOLIDS OIL
(PPG) (SEC.) (CP) Y P GELS pH (CC) W.L. CAKE RIDES %
BIT JET SIZE DEPTH BIT WT. ROT. CONDITION
NO. SIZE MFG. TYPE SERIAL NO. 32ND IN OUT FTC. HRS. FT. IHR. (MLBS.) RPM T B G
HYDRAULICS LINER SIZE STROKE SPM GPM PUMP JET AV DP/Dc
LENGTH PRESSURE VELOCITY
PUMPS /
BHA
OFF BOTTOM ROT. VVT. S.O. WT. RU. WT. B.H.A. LENGTH B.H.A. WT.
DAYS ON JARS NO. BOP Texted:
SERV. PERSONNEL
DALLY COST I CUM. COST IRIG I SUPERVISOR
NORTH SLOPE BOROUGH
DEPARTMENT OF INDUSTRIAL DEVELOPMENT
Barrow Gas Development Daily Drilling Report ALASKA
WELL NAME: L~,~ .~ / DATE: /O/~?~'/"~7~ RIG DAYS:
FOOTAGE
FORMATION: DEPTH: ~ ~ /~8 d ~ Last 24 Hrs.
WEATHER: Wind: Temp.: Visibility:
From To Hrs, DAILY OPERATIONS
!1'- f '- ~ f
DIESEL ON LOC.: DIESEL USED: IDIESELREC'D: IH2OON LOC.' I H2OUSED:
DEVIATION ] Background Gas Units ITripGas Units I Connection Gas Units
Depth Degrees DIRECTION Depth Degrees DIRECTION Depth Degrees DIRECTION
MUD PROPERTIES: Type ~ DAILY MUD COST CUM. MUD COST
WEIGHT VISC. PV A. RI.WL HTHP FILTER CHLO- Sand SOLIDS OIL
(PPG) (SEC.) (CP) Y P GELS pH (CC) W.L. CAKE Pm Pi RIDES % % %
BIT JET SIZE DEPTH BIT WT. ROT. CONDITION
SIZE MFG. TYPE SERIAL NO. ~G. HRS. FT. IHR.
NO. 32ND IN OUT (MLBS.) RPM T B G
I
HYDRAULICS LINER SIZE STROKE SPM GPM PUMP JET AV DP/Dc
LENGTH PRESSU RE VELOCITY
PUMPS /
CASING ISlZE ]~. I GRADE I SHOE FRAC. GRAD. PPGAT ~. [ TOL
BHA
OFF BOTTOM ROT. ~. S.O. WT. RU. ~. B.H.A. LENGTH B.H.A. WT.
DAYS ON JARS NO. BOP Texted:
SERV. PERSONNEL
NORTH SLOPE BOROUGH
DEPARTMENT OF INDUSTRIAL DEVELOPMENT
Barrow Gas Development Daily Drilling Report ALASKA
FORMATION: DEPTH: /~ W~ /3~ / FOOTAGE
Last 24 Hrs.
WEATHER: Wind: Temp.: Visibility:
From To Hrs. DAILY OPERATIONS
DEVIATION ~ Background Gas Units [TripGas Units I Connection Gas Units
Depth Degrees DIRECTION Depth Degrees DIRECTION Depth Degrees DIRECTION
MUD PROPERTIES: Type ¢ DAILY MUD COST
CUM.
MUD
COST
WEIGHT VlSC. PV A. RI.WL HTHP FILTER CHLO- Sand SOLIDS OIL
(PPG) (SEC.) (CP) Y P GELS pH (CC) W.L. CAKE Pm Pi RIDES % % O/o
BIT JET SIZE DEPTH BIT WT. ROT. CONDITION
NO. SIZE MFG. TYPE SERIAL NO. 32ND IN OUT ~G. HRS. ~.IHR. (MLBS.) RPM T B G
HYDRAULICS LINER SIZE STROKELENGTH SPM GPM PREssuPUMP RE VELOCITY JET AV DP/Dc
PUMPS
CASING ~SIZE J~. ~ GRADE ~ SHOE FRAC. GRAD. PPGAT ~. ~ TOl
BHA
OFF BOSOM ROT. ~. S,O. WT. RU. ~. B.H.A. LENGTH B.H.A. WT.
DAYS ON JARS NO, BOP Texted:
SERV. PERSONNEL
NORTH SLOPE BOROUGH
DEPARTMENT OF INDUSTRIAL DEVELOPMENT
Barrow Gas Development Daily Drilling Report ALASKA
FOOTAGE
FORMATION: DEPTH: /YS(~ ~ Last 24 Hrs. //O /
WEATHER: Wind: Temp.: Visibility:
From To Hrs. DAILY OPERATIONS
~ _
DEC 1 4 1990
Alaska 0il & fi~.~ Nnn.~_ nnmmissiOn
.......
Anchorage
DIESEL ON LOC.: DIESEL USED: I DIESEL REC'D: I H20 ON LOC.' I H20 USED:
Depth Degrees DI R ECTIO N Depth Dog rees DI R ECTIO N Depth Degrees DI R ECTION
PROPERTIES: Type I DAILY MUD COST CUM. MUD COST
MUD
WEIGHT VISC. PV A.PI.WL HTHP FILTER Pm Pi CHLO- Sand SOLIDS OIL
(PPG) (SEC.) (CP) Y P GELS pH (CC) W.L. CAKE RIDES %
._
BIT JET SIZE DEPTH
NO. SIZE MFG. TYPE SERIAL NO. 32ND IN OUT FTC. HRS. FT. IHR. BIT WT. ROT. CONDITION
(MLBS.) RPM T B G
HYDRAULICS LINER SIZE STROKE SPM GPM PUMP JET AV DP/Dc
LENGTH PRESSURE VELOCITY
PUMPS 5 V.~- /h ~0 ~00 /
BHA
OFF BOTTOM ROT. WT. S.O. WT. P.U. WT. B.H.A. LENGTH B.H.A. WT.
DAYS ON JARS NO. BOP Texted:
SERV. PERSONNEL
DALLY COST I CUM. COST IRIG I SUPERVISOR
NORTH SLOPE BOROUGH
DEPARTMENT OF INDUSTRIAL DEVELOPMENT
Barrow Gas Development Daily Drilling Report ALASKA
FOOTAGE
FORMATION: DEPTH: ,/~'~D Last 24 Hrs.
WEATHER: Wind: Temp.: Visibility:
From To Hrs. DAILY OPERATIONS
· ' / ~" !
DIESEL ON LOC.: DIESEL USED: J DIESEL REC'D: J H20 ON LOC.: J H20 USED:
Depth Degrees DIRECTION Depth Degrees DIRECTION Depth Degrees DIRECTION
MUD PROPERTIES: Type ~ ~/~ ~ DAILY MUD COST CUM. MUD COST
-
I
WEIGHT VISC. PV A.RI.WL HTHP FILTER CHLO- Sand SOLIDS OIL
(PPG) (SEC.) (CP) Y P GELS pH (CC) W.L. CAKE Pm Pi RIDES
BIT JET S~ZE DEPTH BIT ~. ROT. CONDITION
SIZE MFG. TYPE SERIAL NO. ~G. HRS. ~.IHR.
NO. 32ND IN OUT (MLBS.) RPM T B G
HYDRAULICS LINER SIZE STROKE SPM GPM PUMP JET AV DP/Dc
LENGTH PRESSURE VELOCITY
OFF BOSOM ROT. ~. S.O. WT. RU. ~. B.H.A. LENGTH B.H.A. WT.
DAYS ON JARS NO. BOP Texted:
SERV. PERSONNEL
NORTH SLOPE BOROUGH
DEPARTMENT OF INDUSTRIAL DEVELOPMENT
Barrow Gas Development Daily Drilling Report ALASKA
WELL NAME: ,~ ~ :~D / DATE: /L J/,/~O RIG DAYS:
FOOTAGE
FORMATION: DEPTH: /9~"~ Last 24 Hrs. .,.~_.~.~
WEATHER: Wind: Temp.: Visibility:
From To Hrs. DAILY OPERATIONS
-- . ,,
DEVIATION I ~ackaround ~as Units IXrip~as Units I Connection ~as Units
Depth Degrees DIRECTION Depth Degrees DI R ECTIO N Depth Degrees BI R ECTIO N
MUD PROPERTIES: Type ..~ ~ ~/~ I OA, Y MUD COST CUM. MUD COST
WEIGHT VISC. PV A. EI.WL HTHP FILTER CHLO- Sand SOLIDS OIL
(PPG) (SEC.) (CP) Y P GELS pH (CC) W.L. CAKE Pm Pi RIDES %
BIT JET SIZE DEPTH [ BIT WT. ROT. CONDITION
NO. SIZE MFG. TYPE SERIAL NO. 32ND IN OUT ~G. HRS. ~.IHR. (MLBS.) RPM T B G
HYDRAULICS LINER SIZE STROKE SPM GPM PUMP JET AV DP/Dc
LENGTN PRESSURE VELOCITY
BHA
OFF BOSOM ROT. ~. S.O. WT. RU. ~. B.H.A. LENGTH B.H.A. WT.
DAYS ON JARS NO. BOP Texted:
SER~ PERSONNEL
NORTH SLOPE BOROUGH
DEPARTMENT OF INDUSTRIAL DEVELOPMENT
Barrow Gas Development Daily Drilling Report ALASKA
FOOTAGE
FORMATION: DEPTH: ~/~O Last 24 Hrs.
WEATHER: Wind: Temp.: Visibility:
From To Hrs, DAILY OPERATIONS
DIeSel ON LOC.: DIES~ U~Ed: I ~,ES~ ~C'D: I H~O ON LOC.: ~ H~OUS~:
.ViAt. ON J. k round s I r, as nits Con.e t,on as Un.ts
D~pth Degrees DIRECTION Depth Degrees DIRECTION Depth Degrees DIRECTION
M~,.o,,.t,,s: ~pe ~ ~ ~A,~Y MU~ ~OS~ CUM. MU~ COSt
WEIGHT VISC. PV A.Pi.WL HTHP FILTER CHlO- Sand SOLIDS Oil
(PPG). (SEC.) (CP) Y p GElS pH (CC) W. 1. CAke Pm Pi RIDES % O/o O/o
BIT JET SIZE DEPTH BIT WT. ROT. CONDITION
NO. SIZE MFG. TYPE SERIAL NO. 32ND IN OUT ~G. HRS. ~.IHR. (MLBS.) RPM T B G
I
HYDRAULICS LINER SIZE STROKELENGTH SPM GPM PRESSuREPUMP VELOCITyJET AV DP/Dc
..M.S g ~ /¢ /~¢ ~ /
CASING ~SlZE [~. ~ GRADEI s~o~ ~c, e~A~.~e~T ~. JTOL
BHA
OFF BOSOM ROT. ~. S,O. WT. P.U. ~, B.H.A, LENGTH B.H.A. WT.
DAYS ON JARS NO, BOP Texted:
,,
SERV. PERSONNEL
DA,LY COST J CUM. COST [~'~ { SU~M,SO~
NORTH SLOPE BOROUGH
DEPARTMENT OF INDUSTRIAL DEVELOPMENT
Barrow Gas Development Daily Drilling Report ALASKA
FOOTAGE
FORMATION: DEPTH: 0~ /~'0 Last 24 Hrs.
WEATHER: Wind: Temp.: Visibility:
From To Hrs. DAILY OPERATIONS
DIESEL ON LOC.: DIESEL USED: DIESEL REC'D~ H20 ON LOC.: H20 USED:
DEVIATION I Background Gas Units ITripGas Units I Connection Gas Units
Depth Degrees DIRECTION Depth Degrees DIRECTION Depth Degrees DI R ECTIO N
MUD PROPERTIES: Type ~ DAILY MUD COST CUM. MUD COST
WEIGHT VlSC. PV A.EI.WL HTHP FILTER CHLO- Sand SOLIDS OIL
(PPG) (SEC.) (CP) Y P GELS pH (CC) W.L. CAKE Pm Pi RIDES % % %
~IT JET SIZ~ DEPTH ~IT WT. ROT. CONDITION
SIZE MFG. TYP~ SERIAL NO. ~G. HRS. ~.IHR.
NO. 32ND IN OUT (MLBS.) RPM T B G
HYDRAULICS LINER SIZE STROKE SPM GPM PUMP JET AV DP/Dc
LENGTH PRESSU RE VELOCITY
PUMPS
CASING [SIZE
BHA
OFF BOSOM ROT. ~. S.O. ~. RU. ~, B.H,A. LENGTH B.H,A. WT.
DAYS ON JARS NO. BOP Texted:
SERV, PERSONNEL
DA,LY COST I C~M. COS~ ~,~ I SU~v,so~
NORTH SLOPE BOROUGH
DEPARTMENT OF INDUSTRIAL DEVELOPMENT
Barrow Gas Development Daily Drilling Report ALASKA
FOOTAGE
FORMATION: &~f~ ~ DEPTH: ~/d~ Last 24 Hrs.
WEATHER: Wind: Temp.: Visibility:
From To Hrs. DAILY OPERATIONS
Depth Degrees DIRECTION Depth Degrees DIRECTION Depth Degrees DIRECTION
MUD PROPERTIES: Type ~ DAILY MUD COST CUM. MUD COST
I
~EIGHT VISC. PV A.RI.WL HTHP FILTER CHLO- Sand SOLIDS OIL
(PPG) (SEC.) (CP) Y P GELS pH (CC) W.L. CAKE Pm Pi RIDES % % %
BIT SIZE MFG. TYPE SERIAL NO. JET SIZE DEPTH ~G. HRS. ~.IHR. BIT WT. ROT. CONDITION
NO. 32ND IN OUT (MLBS.) RPM T B G
HYDRAULICS LINER SIZE STROKELENGTH SPM GPM PRESSuREPUMP VELOCITyJET AV DP/Dc
OFF BO~OM ROI ~, S.O. ~. RU. ~. B,H.A. LENGTH B.H.A. WT.
DAYS ON JARS NO. BOP Texted:
SERV. PERSONNEL
COST I c .cosT I
NORTH SLOPE BOROUGH
DEPARTMENT OF INDUSTRIAL DEVELOPMENT
Barrow Gas Development Daily Drilling Report ALASKA
FOOTAGE
WEATHER: Wind: Temp.: Visibility:
From To Hrs. DAILY OPERATIONS
IqO0
Depth Degrees DIRECTION Depth Degrees DIRECTION Depth Degrees DIRECTION
MUD PROPERTIES: Type ] DAILY MUD COST CUM. MUD COST
WEIGHT VlSC. PV A. RI.WL HTHP FILTER Pm Pi CHLO- Sand SOLIDS OIL
(PPG) (SEC.) (CP) Y P GELS pH (CC) W.L. CAKE RIDES % % %
BIT ~. ROT. CONDITION
BIT JET SIZE DEPTH ~G. HRS. ~.IHR. (MLBS.) RPM T B G
NO. SIZE MFG. TYPE SERIAL NO. 32ND IN OUT
HYDRAULICS LINER SIZE STROKE SPM GPM PUMP JET AV DP/Dc
LENGTH PRESSU RE VELOCITY
PUMPS
OFF BOTTOM RO~ ~. S.O. WT. RU. ~. B.H.A. LENGTH B.H.A. WT.
DAYS ON JARS NO. BOP Texted:
SERV. PERSONNEL
NORTH SLOPE BOROUGH
DEPARTMENT OF INDUSTRIAL DEVELOPMENT
Barrow Gas Development Daily Drilling Report ALASKA
FO OTAG E
FORMATION: d, rr~/ .~.~J DEPTH: /t~ T~ 2tl~ " Last24Hrs.
WEATHER: Wind: Temp.: Visibility:
From To Hrs. DAILY OPERATIONS
Depth Degrees DIRECTION Depth Degrees DIRECTION Depth Degrees DIRECTION
MUD PROPERTIES: Type ~ DAILY MUD COST CUM. MUD COST
WEIGHT VISC. PV A.RI.WL HTHP FILTER CHLO- Sand SOLIDS OIL
(PPG) (SEC.) (CP) Y P GELS pH (CC) W.L. CAKE Pm Pi RIDES % % %
BIT JET SIZE ~EPTH BIT ~. ROT. CONDITION
SIZE MFG. TYPE SERIAL NO. ~G. HRS. ~.IHR.
NO. 32ND IN OUT (MLBS.) RPM T B G
HYDRAULICS LINER SIZE STROKE SPM GPM PUMP JET AV DP/Dc
LENGTH PRESSURE VELOCITY
PUMPS
DAYS O~ 0A~S ~O. BO~ loxtod:
NORTH SLOPE BOROUGH
DEPARTMENT OF INDUSTRIAL DEVELOPMENT
Barrow Gas Development Daily Drilling Report ALASKA
FOOTAGE
FORMAT, ON: 60'"t~U" £o.~/ DEPT.: ~.7-Z) ~.11,~' Last24.rs.
WEATHER: Wind: Temp.: Visibility:
From To Hrs. DAILY OPERATIONS
........... I
Depth Degrees DIRECTION Depth Degrees DI R ECTIO N Depth Degrees DI R ECTIO N
MUD PROPERTIES: Type DAILY MUD COST CUM. MUD COST
WEIGHT VISC. PV A.RI.WL HTHP FILTER CHLO- Sand SOLIDS OIL
(PPG) (SEC.) (CP) Y P GELS pH (CC) W.L. CAKE Pm Pi RIDES % % %
JET SIZE DEPTH BIT ~. ROT. CONDITION
BIT SIZE MFG. TYPE SERIAL NO. ~G. HRS. ~.IHR. (MLBS.) RPM T B G
NO. 32ND IN OUT
HYDRAULICS LINER SIZE STROKE SPM GPM PUMP JET AV DP/Dc
LENGTH PRESSURE VELOCITY
PUMPS
OFF BOSOM ~OT.
DAYS O~ dA~S ~0. BOP Ioxtod:
NORTH SLOPE BOROUGH
DEPARTMENT OF INDUSTRIAL DEVELOPMENT
Barrow Gas Development Daily Drilling Report ALASKA
j FOOTAGE
FORMATION: ~,m¢,/~;~/¢. .~"~,,,,~ DEPTH: /~ ~--~¢) j?~/~/~.. Last 24 Hrs.
WEATHER: Wind: Temp.: Visibility:
From To Hrs. DAILY OPERATIONS
-- f -/ ~,- ~,- .
DEVIATION [ Background Gas Units I Trip Gas Units Connection Gas Units
Depth Degrees DIRECTION Depth Degrees DIRECTION Depth Degrees DIRECTION
MUD PROPERTIES: Type I DAILY MUD COST CUM. MUD COST
WEIGHT VISC. PV A.RI.WL HTHP FILTER CHLO- Sand SOLIDS OIL
(PPG) (SEC.) (CP) Y P GELS pH (CC) W.L. CAKE Pm Pi RIDES % % %
BIT WT. ROT. CONDITION
BIT JET SIZE DEPTH FTC. HRS. FT. IHR. (MLBS.) RPM T B G
NO. SIZE MFG. TYPE SERIAL NO. 32ND IN OUT
HYDRAULICS LINER SIZE STROKE SPM GPM PUMP JET AV DP/Dc
LENGTH PRESSURE VELOCITY
PUMPS /
BHA
OFF BOTTOM ROT. WT. S.C. WT. RU. WT. B.H.A. LENGTH B.H.A. WT.
DAYS ON JARS NO. BOP Texted:
s..v. ,..so...,
NORTH SLOPE BOROUGH
DEPARTMENT OF INDUSTRIAL DEVELOPMENT
Barrow Gas Development Daily Drilling Report ALASKA
FOOTAGE
WEATHER: Wind: Temp.: Visibility:
From To Hrs. DAILY OPERATIONS
DIESEL ON LOC.: DIESEL USED: IDIESELREC'D: IHaOON LOC.' I H2OUSED:
BEV,AT,ON I ~ack~rounO ~as units [Trip,as Units [ Connection Gas Units
Depth Degrees DIRECTION Depth Degrees DIRECTION Depth Degrees DIRECTION
MUD PROPERTIES: Type I DAILY MUD COST CUM. MUD COST
WEIGHT VlSC. PV A.RI.WL HTHP FILTER CHLO- Sand SOLIDS OIL
(PPG) (SEC.) (CP) Y P GELS pH (CC) W.L. CAKE Pm Pi RIDES O/o O/o O/o
BIT WT. ROT. CONDITION
BIT JET SIZE DEPTH FTC. HRS. FT. IHR. (MLBS.) RPM T B G
NO, SIZE MFG, TYPE SERIAL NO, 32ND IN OUT
HYDRAULICS LINER SIZE STROKE SPM GPM PUMP JET AV DP/Dc
LENGTH PRESSURE VELOCITY
PUMPS /
BHA
OFF BOTTOM ROT. WT. S.O. WT. P.U. WT. B.H.A. LENGTH B.H.A. WT.
DAYS ON JARS NO. BOP Texted:
SERV. PERSONNEL
NORTH SLOPE BOROUGH
DEPARTMENT OF INDUSTRIAL DEVELOPMENT
Barrow Gas Development Daily Drilling Report ALASKA
WELL NAME: /~.~. ,~:~:~ / DATE: ~./,,//~;~ ¢,,,~,~,~/~ RIG DAYS:
~" ,~j FOOTAGE
FORMATION: ~'~,~te~ ..~' DEPTH: p,~ ,~'"'~) ,~/z30 Last 24 Hrs.
WEATHER: Wind: Temp.: Visibility:
From To Hrs. DAILY OPERATIONS
Depth Degrees DIRECTION Depth Degrees DIRECTION Depth Degrees DIRECTION
MUD PROPERTIES: Type DAILY MUD COST CUM. MUD COST
WEIGHT VlSC. PV A.RI.WL HTHP FILTER CHLO- Sand SOLIDS OIL
(PPG) (SEC.) (CP) Y P GELS pH (CC) W.L. CAKE Pm Pi RIDES % % %
BIT WT. ROT. CONDITION
BIT JET SIZE DEPTH FTC. HRS. FT. IHR. (MLBS.) RPM T B G
NO. SIZE MFG. TYPE SERIAL NO. 32ND IN OUT
HYDRAULICS LINER SIZE STROKE SPM GPM PUMP JET AV DP/Dc
LENGTH PRESSURE VELOCITY
PUMPS /
3HA
OFF BOTTOM ROT. WT. S.O. WT. P.U. VVT. B.H.A. LENGTH B.H.A. WT.
DAYS ON JARS NO. BOP Texted:
SERV. PERSONNEL
DALLY COST I CUM. COST IRIG I SUPERVISOR
NORTH SLOPE BOROUGH
DEPARTMENT OF INDUSTRIAL DEVELOPMENT
Barrow Gas Development Daily Drilling Report ALASKA
J FOOTAGE
DEPTH: ~,~>~'~ _,~//~. Last 24 Hrs.
WEATHER: Wind: Temp.: Visibility:
From To Hrs. DAILY OPERATIONS
DEVIATION I Background Gas Units ]TripGas Units I Connection Gas Units
Depth Degrees DIRECTION Depth Degrees DIRECTION Depth Degrees DIRECTION
MUD PROPERTIES: Type I DAILY MUD COST CUM. MUD COST
WEIGHT VlSC. PV A.RI.WL HTHP FILTER CHLO- Sand SOLIDS OIL
(PPG) (SEC.) (CP) Y P GELS pH (CC) W.L. CAKE Pm Pi RIDES % % %
BIT JET SIZE DEPTH BIT WT. ROT. CONDITION
SIZE MFG. TYPE SERIAL NO. FTG. HRS. FT. IHR.
NO. 32ND IN OUT (MLBS.) RPM T B G
HYDRAULICS LINER SIZE STROKE SPM GPM PUMP JET AV DP/Dc
LENGTH PRESSURE VELOCITY
PUMPS /
BHA
OFF BOTTOM ROT. WT. S.O. WT. P.U. WT. B.H.A. LENGTH B.H.A. WT.
DAYS ON JARS NO. BOP Texted:
SERV. PERSONNEL
.................... iNVENTOIA¥' LIST
AOGCC I_~r_ULUi~II.,.AL M/l, I r"HIRLb
PEFiiviiT # ,~O - //..2. WELL NAiViE ~', ~ 4~ro~,,,' ~,,,2/
COMPLETION DATE //! ~ j ,f'~) CO. CONTACT
jcheck off or fist data a~' it is reccived.*list received date for 407. if not r.cl].uired list as,Nl:J
4,1 j */..~/~/~'~ J drillin~q histo~' !~./ ®suwc¥ J~,~J ~,!1 tests I~,x J core descri.ptior?/R
- /
j , /'ii-', ~rlc' ' J ~I'~UN J i,k, ITEP, VALS SCALE
~ I I r~
NO. {to thc nearest foot] [inchllO0']
· ~ I .Z) L./-,/~',~ ..... / . / ,/'.~,, - .~ / ~,,,' ..2 ,,,.
~': ~-~ ~,,,,:/~:/~,~ I / j , ,, -,
j ' / I , o -
a, I I
9!
1il
il i i
,.
~ I ! '
1~]
RE
RETAIN THIS SECTION FOR YOUR RECORDS
EB-21
BHC/AL ''
CD/CNA NOV ] 5-~ PRINTS
PROLOG PRINTS
ACBL/VDL~S I.G ....
GAMMA ~y
~ PRINTS
ABOVE RECEIVED FROM: ATLAS WIRELINE
ATTENTION State of Alaska
NEG. 1 SEPIA
NEG. 1 SEPIA
NEG.. 1 'SEPIA
NEG. ! ,SEPIA
NEG. _ 1 SEPIA
NEG. 1.,. SEPIA
NEG. ~ SEPIA
NEG. ~ SEPIA
DATE
19¸--
· iou~ o/~ uo~;~suoD I~UamUO;~$au~ Fo
· iou~ o/z.~, uo-.~o~S ~q~H '~m~O ~ qs~ ~o ~u~~d~G
~.znsoiauR
uzSSi~$'{O3 MP~ ,60 }l:R~'dO A~
.
· IieZ~ p~ou~a~oa aAoq~
aq~ II!aP o2 2Ima~d ao~ uo$2woIIddw p~Ao~ddw ~l~ s! p~soIouH
:ueIiV ' a~ zweG
066I '0I z~qmeQdes
:XdooeI~£
NORTH SLOPE BOROUGH
BARROW GAS FIELD DEVELOPMENT PROJECT
P.O. Box 1120 Barrow, Alaska 99723
August 13, 1990
Mike Minder
State of Alaska
Alaska Oil & Gas Conservation Commission
3001 Porcupine Drive
Anchorage, Ak. 99501
Dear Mike:
Enclosed is the modified Application for Permit to Drill the
East Barrow #21 (EB #21) well. The APD and associated attachments
were changed to incorporate the Commission's requirements regarding
the setting depth of the 9 5/8" casing.
If you have any questions or require additional information,
please don't hesitate to call.
Sincerely ,I
William W. Allen,
Petroleum Engineer
~---. STATE OF ALASKA ,-
ALASKA ( AND GAS CONSERVATION CC fiSSION
PERMIT TO DRILL
20 AAC 25.005
la. Type of work Drill _~: Redrill _--[ lb. Type of well. Exploratory ;~ Stratigraphic Test ? Development Oil
Re-Entry - Deepengl Service _-- Developement Gas ~ Single Zone ;-; Multiple Zone
..
2. Name of Operator 5. Datum Elevation (DF or KB) 10. Field and Pool
North Slope Borough/Barrow Gas Fields 19' KB feet East Field
3. Address 6. Property D~esignation
P.O. Box 1120, Barrow, Ak. 99723 NSB FE~.~ -_-' East Barrow Gas Field
.
4. Location of well at surface 7. Unit or property Name 11. Type Bond(see 20AAC 25.025)
East Barrow
A32 FSL, 459' FWL Sec. 24 T22N, R17W,
t top of productive interval '
U.M. 8. Well number Number CD 17430
as above E,B, #21
At total depth 9. Approximate spud date Amount
as above October 1, 1990 200,000
,
12. Distance to nearest 13. Distance to nearest well 14. Number of acres in property 15. Proposed depth~M0 and TVO~
property line
approx. 11,200' feet 2036' feet 21,120 2200' KB feet
16. To be completed for deviated wells n/a 17. Anticipated pressure (see 2o AAC 25.035 (e)(2))
Kickoff depth feet Maximum hole angle 0 Maximum surface 1000 psig At total depth (TVD) 1050 psig
18. Casing program Setting Depth
size Specifications Top Bottom Quantity of cement
Hole Casing Weight Grade Coupling Length MD TVD MD TVD (include stage data)
,..
18" 13 3/8" 72# S-95 8r¢ 60" 0 69' 11 Sx Pcrrnafro.st
.12 1/4" 9 5./8" 400 N-80 8rd 1424' 0 1433' 934 Sx Permafrost
8 1/2" 7" 23# N-80 8rd 2191' 0 2200' 83 Sx Class G
...
19. To be completed for Redrill, Re-entry, and Deepen Operations.
Present well condition summary
Total depth: measured feet Plugs (measured)
true vertical feet
Effective depth: measured feet Junk (measured)
true vertical feet
Casing Length Size Cemented Measured depth True Vertical depth
Structural
Conductor ~R!E~'("C E J V E D
Surface
Intermediate ',~LJG ~.':,
Production
Liner
/~ch0ra~
Perforation depth: measured ..
..
true vertical
20. Attachments Filing fee [] Property plat ~ BOP Sketch F-,2 Diverter Sketch ~ Diiiling program ~
Drilling fluid program ~ Time vs depth plot [] Refraction analysis [] Seabed report ,~ 20 AAC 25.050 requirements
....
21. I hereby certi.fy that the~oregoing is true and correct to the beSt of my knowledge
Signed /¢~//~W~~! Title ~,"-4~,"/ ~-/~¢,/v~" Date
Commission Use Only
Permit Number J A,I number J u,/~d(~ego J for other requirements
¢(¢) - //~, 50-- ~¢ ,.~- ¢~, I¢)~,,3~, 7 Apprj:Lva,I See cover letter
Hydrogen sulfide.measures E] Yes J~No Directional survey required [] Yes~N
o'
Required working pressure for BOPE ~¢.M; [] 3M; [] 5M; [] 10M; [] 15M
Other:
~ ~~L~t"'/'"~~ by order of
Approved Commissioner the commission Date ?j/.j
/~_
Form 10-401 Rev. 12-1-85
Submit in triplicate
I~TET,T. SERVICE REPORT
WELL: EB ~19
CONTRACTOR:
DISTRICT: BGF
DAYS: 2 DATE: 7/18/88
(MON)
BGFDP/ A1 Maas,PE / Don Wolcott,PE Supervisor
Log on tool at 1644 hrs. Shut in EB #19 @ 1640 hrs.
.
GLYCOL HEAT STRING. TEMP: TO WELL: 69.5 ° F FROM WELL:' 68 ° F
TBG TEMP AT WET.?~TF..A_D: 69.5 °F
Ran pressure gauge to landing depth to obtain a post flow, static
temperature and pressure gradient.
TIME,24~ DEPTH, FT TEMP,'F PRESSURE,PSIA
1654 50 56.5 687.1
1659 100 59.8 689.4
1703 200 62.7 692.1
1708 500 65.1 698.0
1715 1000 66.0 707.1
1725 1900 63.9 722.0
1725 2000 61.5 730.5
1729 2000 60.0 730.5
Opened well EB #19 @ 1729 hrs
Calculated Flow Rate is 1500 MCF on 1%" Orifice Plate
-DIFF: 41.0 and Static @ 26.0 PSIA
2049 2000 40.7 691.4
2149 2000 .40.69 691.1
Well flow is stabilizing at 1600 MCF/D, no indication of-
hydrates. Water production and sand production to be checked. '
Well left to flow until tomorrow.
Abbreviated Operational Sequence (East Barrow #21)
1. Preset ± 60' of 13-3/8" conductor pipe.
2. Rig-up for shake down of Jade Rig #2.
3. NU BOP and diverter system, function test. Drill 12-1/4" hole
to + 1450 KB.
4. RIH w/9-5/8" casing to ± 1433'. Cement to surface with
Permafrost Cement.
5. NU BOP and pressure test to (1500 psi), clean tanks and mix
mud system per Baroid specifications.
6. Pressure test casing to 1500 psi, drill shoe and 10' of new
8-1/2" hole; perform LOT; drill 8-1/2" hole to T.D. ± 2200'.
7. Run DLL-SP-GR & CDL-CNL-GR-CAL, BHC-Sonic-Cal-GR logs.
8. Install and test 7" rams; RIH w/7" csg. to TD; clean tanks;
prepare to run Arctic Pac and mix Class G cement.
9. Pump Arctic Pac, mud spacer and sufficient Class G cement to
place the 7" casing cement top 500' above the top of the
hydrocarbon bearing formation. (Barrow Sand)
10. Run CCL-CBL-GR logs.
11. RIH w/2-3/8" tubing open ended to TD. Roll hole with diesel.
POH PU Tubing conveyed guns. RIH space out.
12. NU wellhead and test (3000 psi).
13. RD MO.
14. Perforate and test well.
~uoN
8D-I~D-amuos Dh~ ~
' 8D-~IS-~I(/ ; 8D-~I(]D-~IND
~o~g~ns o~ ,, 8/§6 ~u~maD
, _ aq oJ atunioA -uoT$pttt~o~
6u'Fa'~S~l. uoqsr~ooapJ[q ~o do~
aAoq~ ,00§ 05 ,/. stratuaO
6dd 0'6 - §'8
pnm Tab p~s~r~IsTP-UON
bdd cj' 8~
/~ pnu] ~au~loE/lD>i
,/
9
.-' 14 13 -.~ ,,, ~- -' '~
.
23 I 24 24 ~ / ' 19 ,';~- ! % 20
~ .~ ~ --~ .... I /'~ ~l~ ' · ' '-
~ -~ , · , ~/ :., - , . ..
· -- :. L~- ; t ~k ~;~ - - : ~ -'
..'~.', ~- '_ , '~ ---~ X=l~ - -* '- ' ' ~ -
.... ~...._~__
· ~~-- -~,,,~'~ '---:[ ///I x ,.~'~ ~ .. - -,-
_ ~ '~. 7% -- - ,- ~ C E~..;.., ~ -' ~ i ~- - - -
_~ - ~ -_ - --, .- ~-.i-~t~ ~ ~ --~: ~. ' ,
---~ '-~/~'~'------;' ~ '~'.' -:'.-%-_ ,,L - -"U - -~ ' ~--" ' '-
l.% ..... ~. . :~J~ V. _-%¢- ~-'' l. lZ: ~- -
' - ~ - ' ' ~,. ~.1- ~. '.~ ~ ~
. ~ . ~ _- .. ~ ~ · ~l. ~ -~ - ~ ~ . . ~ '-
RECEIVED
AU~ o 8 ~gSO
41a~ Oil.& Gas Cons.
SURVEYORS CERTIFICATE
I Hereby Certify That I am a Professional Land
Surveyor in and for the State of Alaska and
That This Plat Represents a Proposed well Location
Survey Made by me or Under my Supervision, and
That All Dimensions and Other Details are Correct.
S u rveyo r ,~¢..~--,~-,~~57 Date ._~~ -'-~'~:::)
N S B WELL EB #21
I_AT : 71 °14'19.75"
LONG = 156°19'07.31"
Y = 6,305,670
X = 698,O54
ZONE = 6
PROPOSED
NORTH SLOPE BOROUGH WELL EB /t21
LOCATED IN
SW 1/4 PROTRACTED SECTION 24, T. 22N., R 17W., U.M., ALASKA
NORTH SLOPE BOROUGH
BARROW GAS FIELD OPERATIONS
BTS/LCMF LIMITED, J.V.
P.O. BOX 427 723 W. 6TH AVENUE
BARROW', ALASKA ANCHORAGE, ALASKA
i ii ii iii i i i i i ~ i i ii
STACK
lI
i
i
-!
CHOKE ~IIFOLD.
JADE DREAiNG
RIG NO. 2
CONTROL STSTEX
.
~oo -g-'~
'De,t~.~,'~og $'-,I
SHAKER
MUD CLEANER
I
I I
MUD SYSTEM PICTORIAL
AGITATOR
~ CENTRIF*UGAL PUI~P
SUCTION VALVES,
SUCTION VALVES,
BUTTERFLY
VALVES,
TO CLOSED LOOP
UUD SYSTE. IQ
2'
8'
60 BBLI
RIG 2 MUD SYSTEM SCHEMATIC
,,o,/,
1
Z
r-
I r .... ~ I
I i i I
I ri r~ I
i Ii II !
I IL .... JI I ,-
I I I I I
I
MUI:) I
PLAN VIEW
SHALE I I I
$I'4AI',ER I I I CL~N~R I
I t I I
m
L 9'-! I/2" __!_7'-9 1/2"_
ELEVATION
19'-7"
END
'VIEW
10'-8"
12'-7"
, ,
_i
I
kI ECE'i, VED
~[JG l ,',
~_ laska Oil & 6as Cons.
Anchoraga
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
3001 Porcupine Drive
Anchorage, Alaska, 99501-3912
Re:
THE REQUEST OF THE NORTH )
SLOPE BOROUGH to present )
testimony to determine )
field and pool rules for )
the Barrow Gas Field. )
Conservation Order No. 233
Barrow Gas Field
South Barrow Gas Pool
East Barrow Gas Pool
September 30, 1987
IT APPEARING THAT:
.
The North Slope Borough, operator of the Barrow Gas Field,
requested the Alaska Oil and Gas Conservation Commission by
letter dated July 22, 1987 to hold a public hearing in order
to receive testimony for establishment of pool rules to
govern the drilling, development, and production operations
for the South Barrow Gas Pool and the East Barrow Gas Pool.
·
Notice of public hearing held August 31, 1987 was published
in the Anchorage Daily News on July 25, 1987.
~
A hearing covering the matter of the applicant's request was
held in conformance with 20 AAC 25.540 at the office of the
Commission, 3001 Porcupine Drive, Anchorage, Alaska 99501 at
9:00 a.m. on August 31, 1987.
·
Members on the staff of the North Slope Borough presented
testimony including exhibits. The hearing record was closed
at the end of the public hearing.
FINDINGS:
·
Gas accumulations in basal transgressive Jurassic and
Cretaceous age sands occur in structural traps peripheral to
an apparent diapir-like feature near the village of Barrow,
Alaska.
·
Two gas accumulations near Barrow have been known as the
South Barrow Gas Field and the East Barrow Gas Field from
which gas is produced for local consumption.
·-
From production history the East Barrow Gas reservoir shows
an active water-drive, whereas the South Barrow Gas reser-
voir has none. The two gas accumulations do not appear to
be in communication.
Conservation Order No. 253
September 30, 1987
P age 2
·
The sands in which the gas accumulations occur in the South
and East Barrow Pool are lenticular in nature and irregular
in occurrence.
.
The vertical limits of the gas pool in the South Barrow Gas
Pool and the East Barrow Gas Pool may be defined by gas
sands penetrated in the North Slope Borough South Barrow
No. 13 well which appears to be a typical and representative
well.
·
Well spacing in the South Barrow Gas Pool was regulated by
Federal agencies during early development of the pool
following its discovery in 1949.
·
Well spacing in the East Barrow Gas Pool was regulated by
Federal agencies during early development of the pool
following its discovery in 1974.
.
Several wells have been drilled, and completed or abandoned
under federal jurisdiction prior to this Order and, there-
fore, are not in violation of statewide regulations or this
Order. ~
·
The Barrow Gas Field was conveyed to the North Slope Borough
from the Federal government in 1984.
10. The gas wells in the South and East Barrow Gas Pools have
been on production for many years, and have produced
reliably and safely.
11. Barrow is entirely dependent upon the Barrow Gas Field which
is the sole supply of heat and fuel for electrical
generation; therefore, there are bypasses around the gas
production meters which are to remain sealed except in
emergencies.
12. Accumulated hydrocarbon liquids and water are purged from
wells by two to three minute blowdowns of the tubing at
intervals normally between one and four weeks, depending on
production rate.
13. Approximate depth of permafrost in the affected area is
550 feet TVD.
CONCLUS IONS:
1. It is appropriate to write field rules for the Barrow Gas
Field.
2. There are two pools in the Barrow Gas Field..
Conservation Order No. 233
September 30, 1987
Page 3
·
The Barrow Gas Field has been operated safely and reliably
with existing spacing, construction, and operational
procedures.
NOW, THEREFORE, IT IS ORDERED THAT the rules hereinafter set
forth apply to the following described area referred to in this
Order as the affected area:
UMIAT MERIDIAN
T21N RI 6W
Sections 4,5,6,7,8,9,16,
17,18,19,20 and 21.
T21N RI 7W
Sections 1,2,3,4,5,6,7,8,9,10,11,
12,13,14,15,16,17,18,19,20,21,
22,23 and 24.
T21N R18W
Sections 1,2,3,10,11,12,13,14,
15,22,23 and 24.
T22N RI 6W
SeCtions 19,20,28,29,30,31,
32 and 33;
S~ Sections 17,18 and 21.
T22N RI 7W
Sections 7,8,17,18,19,20,21,22,23,
24,25,26,27,28,29,30,31,32,33,
34,35 and 36;
S~ Sections 5,6,13,14 and 15;
W~ Section 9;
W~ and SE¼ Section 16o
T22N RI 8W
Sections 10,11,12,13,14,15,22,
23,24,25,26,27,34,35 and 36;
S~ Sections 1,2 and 3.
Rule 1 Field and Pool Name
The field is named the Barrow'Gas Field. The hydrocarbons
contained within the sands in the cretaceous Pebble Shale Unit
and Jurassic Kingak formation constitute two reservoirs named the
South Barrow Gas Pool and the East Barrow Gas Pool.
Rule 2 Pool Definition
The South Barrow Gas Pool and the East Barrow Gas Pool are
defined as the accumulations of gas which are common to and which
correlate with the accumulations found in the North Slope Borough
South Barrow No o 13 welI between the measured depths of 2210 and
2472 feet.
Conservation Order No. 233
September 30, 1987
Page 4
Rule 3 Well Spacing
a) The spacing of all wells drilled and completed within the
affected area prior to the date of this Order is approved.
b) Nominal 160-acre drilling units are established for the pool
within the affected area for all wells to be drilled and com-
pleted subsequent to the date of this Order. Each drilling unit
shall conform to governmental quarter sections. No more than one
well may be drilled into and produced from each drilling unit. A
pool may not be opened in a well closer than 1000 feet to any
other well opened in the pool. A pool shall not be opened in any
well closer than 1500 feet to the exterior boundary of the
affected area or closer than 1500 feet from the boundary where
ownership changes.
c) Upon application by the operator accompanied by sub-
stantiating data based on engineering and geological principles,
the Commission may administratively approve modifications to well
spacing.
Rule 4 Casing and Cementing Requirements
a) Surface casing to provide for proper anchorage to the
surrounding formation, to prevent uncontrolled fluid flow, and to
protect the well from the effects of permafrost thaw-subsidence
or freeze-back loadings, shall be set at least 500 measured feet
below the base of the permafrost. Sufficient cement shall be
used to fill the annulus behind the casing to the surface.
b) Alternate means for maintaining the integrity of the
well from the effects of permafrost thaw-subsidence and freeze-
back may be administratively approved by the Commission upon
application and presentation of data which show the alternatives
are appropriate, based upon accepted engineering principles.
Rule 5 Completion Practice
Wells completed for production from the Barrow Gas Pools are to
utilize casing strings or liners cemented through the production
intervals. The Commission may administratively approve alternate
completion methods where appropriate.
Rule 6 Gas Venting or Flaring
a) The venting or flaring of gas is prohibited except as
may be authorized by the Commission for facility safety, opera-
tional necessity, and in cases of emergency.
Conservation Order No. 233
September 30, 1987
Page 5
b) Bottom-hole accumulated hydrocarbon liquids and water
may be purged from wells by periodic tubing blowdowns of brief
duration. ~
DONE at Anchorage, Alaska, and dated September 30, 1987.
! ~~~ iAlaska Oil and Gas Conservation Commission
W. W. Barnwell, Commissioner
Alaska Oil and Gas Conservation Commission
...... ~.-~T FOR NEW WELL PERM%TS
APPROVE DATE
2 thru 8-)' "'
(8)
(9 :a~ Z3)''
(10 ~d ~3) 12..
i3.
(4)
~,~ '(14 :h~ 22) 14.
(5) Bop=_
,,.
(23 thru 28)
YES
Is =he perm.i: fee attached .......................................... ~
Lease & Well No. NO
2. Is well :o' be located in a defined pool~. ............................
3. Is well located proper distance from property line .................. T
4. is we!! located proper dis=ance from other wells ........
5. Is sufficient undedicated acreage available in this pool ............
6. Is well =o be deviated and is wei!bore plat included ................
7. Is opera=or the only affected par=y ................................. ~ .....
8. Can permi= be approved before fifteen-day wait ......................
Does operator have a bond in force ..................................
is a conserve=ion order needed ......................................
Is administrative approval needed ...................................
Is =he lease number appropriate .....................................
Does =he we!! have a unique name and number .........................
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
26.
27.
28.
Is cdnductor string provided ........................................
Will surface casing protect all zones reasonably expected to
sez~ze as an underground source of drinking water .....................
Is enough cement used to circulate on conductor and surface .........
Will cement tie in surface and intermediate or production strings
Will cement cover all kno~ra productive horizons .....................
Will all casing give adequate safety in collapse, =ension and burs=..
Is this well to be kicked off from au ez_isting we!!bore .............
Is old we!lbore abandonment procedure included on 10-403 ............
Is adequate wei!bore separation proposed ..................... ' ......
Is a diver=er system required .......................................
Is the drilling fluid program schematic and list of equipment adequate
Are necessary diagrams and descriptions of diverter and BOPE attached.~
Does BOPE have sufficient pressure rating - Test to ~Ooo psig ..
Does the choke manifold comply w/API RP-53 (May 84) ..................
Is the presence of H2S gas probable ............................. ~...
_ Thru 31)
rev: 01/30/89
6.011.
·
..
~or
29.
30.
31.
32.
exploratory and Stratigraphic wells:
Are data presented on potential overpressure zones? .................
Are seismic analysis data presented on shallow gas zones ............
If au offshore loc., are survey results of seabed conditions presented
Additional requirements .............................................
''l ~ZZ~ GEO. UNIT oN / OFF I
POOL CLASS STATUS AREA NO. SHORE
, ,
, , ,
,