Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout182-2107. Property Designation (Lease Number): 1. Operations Performed: 2. Operator Name: 3. Address: 4. Well Class Before Work:5. Permit to Drill Number: 6. API Number: 8. Well Name and Number: 9. Logs (List logs and submit electronic data per 20AAC25.071): 10. Field/Pool(s): Susp Well Insp Install Whipstock Mod Artificial Lift Perforate New Pool Perforate Plug Perforations Coiled Tubing Ops Other Stimulate Fracture Stimulate Alter Casing Pull Tubing Repair Well Other: Change Approved Program Operations shutdown 11. Present Well Condition Summary: Casing Length Size MD TVD Burst Collapse Exploratory Stratigraphic Development Service 14. Attachments (required per 20 AAC 25.070, 25.071, & 25.283) 16. Well Status after work: 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. OIL GAS WINJ WAG GINJ WDSPL GSTOR Suspended SPLUG Authorized Name and Digital Signature with Date: Authorized Title: Contact Name: Contact Email: Contact Phone: PBU H-18 Hilcorp North Slope, LLC 3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 182-210 50-029-20880-00-00 9810 Conductor Surface Intermediate Production Liner 9269 80 2457 8929 1123 9194 20" x 30" 13-3/8" 9-5/8" 7" 8696 38 - 118 38 - 2495 35 - 8964 8687 - 9810 38 - 118 38 - 2495 35 - 8479 8221 - 9269 8762, Unknown, 9546 2670 4760 5410 9194, 9463, 9470 5380 6870 7240 9166 - 9540 5-1/2" 17# x 4-1/2" 12.6# 13Cr80 / L-80 33 - 8762 8669 - 9019 Structural 5-1/2" Baker S-3 Packer 8622, 8160 8508, 8622 8054, 8160 Torin Roschinger Operations Manager Aras Worthington aras.worthington@hilcorp.com 907-564-4763 PRUDHOE BAY, Prudhoe Oil Pool Total Depth Effective Depth measured true vertical feet feet feet feet measured true vertical measured measured feet feet feet feet measured true vertical Plugs Junk Packer Measured depth True Vertical depth feet feet Perforation depth Tubing (size, grade, measured and true vertical depth) Packers and SSSV (type, measured and true vertical depth) 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13a.Representative Daily Average Production or Injection Data Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: Subsequent to operation: 15. Well Class after work: Exploratory Development Service StratigraphicDaily Report of Well Operations Copies of Logs and Surveys Run Electronic Fracture Stimulation Data Sundry Number or N/A if C.O. Exempt: ADL 0028284 33 - 8291 N/A N/A 671 718 64389 42041 709 11 1250 1150 2100 1430 N/A 13b. Pools active after work:Prudhoe Oil Pool 5-1/2" BOT Packer 8508, 8054 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS Sr Pet Eng: Sr Pet Geo: Form 10-404 Revised 10/2022 Submit in PDF format to aogcc.permitting@alaska.gov Sr Res Eng: Due Within 30 days of Operations By Grace Christianson at 2:28 pm, Aug 13, 2024 Digitally signed by Torin Roschinger (4662) DN: cn=Torin Roschinger (4662) Date: 2024.08.13 12:55:42 - 08'00' Torin Roschinger (4662) RBDMS JSB 082024 WCB 10-1-2024 DSR-8/21/24 ACTIVITY DATE SUMMARY 7/30/2024 ***WELL S/I ON ARRIVAL*** (PLUG SET) RIG UP YJ ELINE. PT PCE 300 PSI LOW /3000 PSI HIGH HEX PLUG TO SET PLUG AT 9194' MD, CCL TO MID ELEMENT 20' CCL STOP DEPTH 9174' MD CCL LOG CORRELATE TO HALLIBURTON TMD 3 DETECTOR DATED 18-MAR- 2014 JOB COMPLETE **WELL S/I ON DEPARTURE*** Daily Report of Well Operations PBU H-18 HEX PLUG TO SET PLUG AT 9194' MD HEX plug is shown correctly on the WBS below. -WCB 7. Property Designation (Lease Number): 1. Operations Performed: 2. Operator Name: 3. Address: 4. Well Class Before Work:5. Permit to Drill Number: 6. API Number: 8. Well Name and Number: 9. Logs (List logs and submit electronic data per 20AAC25.071): 10. Field/Pool(s): Susp Well Insp Install Whipstock Mod Artificial Lift Perforate New Pool Perforate Plug Perforations Coiled Tubing Ops Other Stimulate Fracture Stimulate Alter Casing Pull Tubing Repair Well Other: Change Approved Program Operations shutdown 11. Present Well Condition Summary: Casing Length Size MD TVD Burst Collapse Exploratory Stratigraphic Development Service 14. Attachments (required per 20 AAC 25.070, 25.071, & 25.283) 16. Well Status after work: 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. OIL GAS WINJ WAG GINJ WDSPL GSTOR Suspended SPLUG Authorized Name and Digital Signature with Date: Authorized Title: Contact Name: Contact Email: Contact Phone: PBU H-18 Pull HEX Plug Hilcorp North Slope, LLC 3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 182-210 50-029-20880-00-00 9810 Conductor Surface Intermediate Production Liner 9269 80 2457 8929 1123 9463 20" x 30" 13-3/8" 9-5/8" 7" 8948 38 - 118 38 - 2495 35 - 8964 8687 - 9810 38 - 118 38 - 2495 35 - 8479 8221 - 9269 8762, Unknown, 9546 2670 4760 5410 9463, 9470 5380 6870 7240 9166 - 9540 5-1/2" 17# x 4-1/2" 12.6# 13Cr80 / L-80 33 - 8762 8669 - 9019 Structural 5-1/2" Baker S-3 Packer 8622 / 8160 8508, 8622 8054, 8160 Torin Roschinger Operations Manager Aras Worthington aras.worthington@hilcorp.com 907-564-4763 PRUDHOE BAY, Prudhoe Oil Pool Total Depth Effective Depth measured true vertical feet feet feet feet measured true vertical measured measured feet feet feet feet measured true vertical Plugs Junk Packer Measured depth True Vertical depth feet feet Perforation depth Tubing (size, grade, measured and true vertical depth) Packers and SSSV (type, measured and true vertical depth) 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13a.Representative Daily Average Production or Injection Data Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: Subsequent to operation: 15. Well Class after work: Exploratory Development Service StratigraphicDaily Report of Well Operations Copies of Logs and Surveys Run Electronic Fracture Stimulation Data Sundry Number or N/A if C.O. Exempt: ADL 0028284 33 - 8291 N/A N/A 572 735 60378 63710 732 764 1250 1200 2100 2100 N/A 13b. Pools active after work:Prudhoe Oil Pool 5-1/2" BOT Packer 8508 / 8054 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS Sr Pet Eng: Sr Pet Geo: Form 10-404 Revised 10/2022 Submit in PDF format to aogcc.permitting@alaska.gov Sr Res Eng: Due Within 30 days of Operations No SSSV Installed Digitally signed by Torin Roschinger (4662) DN: cn=Torin Roschinger (4662) Date: 2024.07.13 08:32:28 - 08'00' Torin Roschinger (4662) By Grace Christianson at 9:00 am, Jul 15, 2024 WCB 9-30-2024 RBDMS JSB 071924 DSR-7/15/24 ACTIVITY DATE SUMMARY 6/22/2024 ***WELL S/I ON ARRIVAL*** (Perforating) RIGGED UP POLLARD #60 ***CONTINUE ON 6/23/24 WSR*** 6/23/2024 ***CONTINUED FROM 6/22/24 WSR*** (Perforating) RAN 10' x 3.50" PUMP BAILER TO HEX PLUG AT 9,198' MD (empty - marks on bottom) PULLED HEX PLUG FROM 9,190' SLM(missing element & backup fingers) RAN 5-1/2" BLB, 3.69" 3-PRONG WIRE GRAB TO 8,750' SLM(no recovery) ****WELL LEFT S/I ON DEPARTURE, PAD-OP NOTIFIED OF STATUS**** Daily Report of Well Operations PBU H-18 ) PULLED HEX PLUG FROM 9,190' SLM(missing element & backup fingers) RAN 5-1/2" BLB, 3.69" 3-PRONG WIRE GRAB TO 8,750' SLM(no recovery) (g g) 7. Property Designation (Lease Number): 1. Operations Performed: 2. Operator Name: 3. Address: 4. Well Class Before Work:5. Permit to Drill Number: 6. API Number: 8. Well Name and Number: 9. Logs (List logs and submit electronic data per 20AAC25.071): 10. Field/Pool(s): Susp Well Insp Install Whipstock Mod Artificial Lift Perforate New Pool Perforate Plug Perforations Coiled Tubing Ops Other Stimulate Fracture Stimulate Alter Casing Pull Tubing Repair Well Other: Change Approved Program Operations shutdown 11. Present Well Condition Summary: Casing Length Size MD TVD Burst Collapse Exploratory Stratigraphic Development Service 14. Attachments (required per 20 AAC 25.070, 25.071, & 25.283) 16. Well Status after work: 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. OIL GAS WINJ WAG GINJ WDSPL GSTOR Suspended SPLUG Authorized Name and Digital Signature with Date: Authorized Title: Contact Name: Contact Email: Contact Phone: PBU H-18 Pull HEX Plug Hilcorp North Slope, LLC 3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 182-210 50-029-20880-00-00 9810 Conductor Surface Intermediate Production Liner 9269 80 2457 8929 1123 9198 20" x 30" 13-3/8" 9-5/8" 7" 8700 38 - 118 38 - 2495 35 - 8964 8687 - 9810 38 - 118 38 - 2495 35 - 8479 8221 - 9269 Unknown, 9546 2670 4760 5410 9198, 9380, 9463, 9470 5380 6870 7240 9166 - 9540 5-1/2" 17# x 4-1/2" 12.6# 13Cr80 / L-80 33 - 8762 8669 - 9019 Structural 5-1/2" Baker S-3 Packer 8622 / 8160 8508, 8622 8054, 8160 Torin Roschinger Operations Manager Aras Worthington aras.worthington@hilcorp.com 907-564-4763 PRUDHOE BAY, Prudhoe Oil Pool Total Depth Effective Depth measured true vertical feet feet feet feet measured true vertical measured measured feet feet feet feet measured true vertical Plugs Junk Packer Measured depth True Vertical depth feet feet Perforation depth Tubing (size, grade, measured and true vertical depth) Packers and SSSV (type, measured and true vertical depth) 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13a.Representative Daily Average Production or Injection Data Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: Subsequent to operation: 15. Well Class after work: Exploratory Development Service StratigraphicDaily Report of Well Operations Copies of Logs and Surveys Run Electronic Fracture Stimulation Data Sundry Number or N/A if C.O. Exempt: ADL 0028284 33 - 8291 N/A N/A 641 1189 59969 86628 40 1338 1200 1200 1860 1400 N/A 13b. Pools active after work:Prudhoe Oil Pool 5-1/2" BOT Packer 8508 / 8054 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS Sr Pet Eng: Sr Pet Geo: Form 10-404 Revised 10/2022 Submit in PDF format to aogcc.permitting@alaska.gov Sr Res Eng: Due Within 30 days of Operations By Grace Christianson at 2:41 pm, May 06, 2024 Digitally signed by Torin Roschinger (4662) DN: cn=Torin Roschinger (4662), ou=Users Date: 2024.05.06 14:25:50 -08'00' Torin Roschinger (4662) RBDMS JSB 051524 DSR-5/6/24 ACTIVITY DATE SUMMARY 4/19/2024 ***WELL S/I ON ARRIVAL*** (perforating) JARRED ON HEX PLUG FOR 30MIN STOPPED TO ALLOW ELEMENT TO RELAX ***CONTINUED ON 4/20/24 WSR*** 4/20/2024 ***CONTINUED FROM 4/19/24 WSR*** (Perforating) PULLED HEX PLUG AT 9,380' MD (Missing element) RAN 5 1/2" BLB & 3.69" WIRE GRAB TO 9,300' SLM(No recovery) RAN 5 1/2" BLB & 3.55" GAUGE RING TO 9,400' SLM ***WELL S/I ON DEPARTURE*** 4/27/2024 ***WELL S/I ON ARRIVAL*** (SET 3.63'' OD HEX PLUG IN 7'' 29# CASING ADPERF 2.750" 6SPF 60 DEGREE PHASE) RIG UP YJ ELINE. PT PCE 300 PSI LOW /3000 PSI HIGH RUN#1 CH 1.435" 1'/ WB 1.687" 7'/ GR-CCL 2.75" /16' GUN OF 2.75"/OAL 38.2'/ MAX OD 2.750" TO PERFORATE INTERVAL 9166' TO 9182' CCL TO TOP SHOT 12.5' CCL STOP DEPTH 9153.5' MD RUN#2 CH 1.435" 1'/ WB 1.687" 7'/ GR-CCL 2.75"/HEX PLUG /MAX OAL 32.9'/MAX OD 3.63'' TO SET 3.63'' HEX PLUG AT 9198' MD CCL TO MID ELEMENT 19.4' CCL STOP DEPTH 9178.6' MD,TAKE 15 MIN TO SET HEX PLUG GR-CCL CORRELATED TO HES THERMAL DECAY 3 DETECTOR LOG DATED 18- MARCH-2014 JOB COMPLETE ***WELL S/I ON DEPARTURE*** Daily Report of Well Operations PBU H-18 7. Property Designation (Lease Number): 1. Operations Performed: 2. Operator Name: 3. Address: 4. Well Class Before Work:5. Permit to Drill Number: 6. API Number: 8. Well Name and Number: 9. Logs (List logs and submit electronic data per 20AAC25.071): 10. Field/Pool(s): Susp Well Insp Install Whipstock Mod Artificial Lift Perforate New Pool Perforate Plug Perforations Coiled Tubing Ops Other Stimulate Fracture Stimulate Alter Casing Pull Tubing Repair Well Other: Change Approved Program Operations shutdown 11. Present Well Condition Summary: Casing Length Size MD TVD Burst Collapse Exploratory Stratigraphic Development Service 14. Attachments (required per 20 AAC 25.070, 25.071, & 25.283) 16. Well Status after work: 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. OIL GAS WINJ WAG GINJ WDSPL GSTOR Suspended SPLUG Authorized Name and Digital Signature with Date: Authorized Title: Contact Name: Contact Email: Contact Phone: PBU H-18 Hilcorp North Slope, LLC 3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 182-210 50-029-20880-00-00 9810 Conductor Surface Intermediate Production Liner 9269 80 2457 8929 1123 9380 20" x 30" 13-3/8" 9-5/8" 7" 8870 38 - 118 38 - 2495 35 - 8964 8687 - 9810 38 - 118 38 - 2495 35 - 8479 8221 - 9269 Unknown, 9546 2670 4760 5410 9380, 9463, 9470 5380 6870 7240 9203 - 9540 5-1/2" 17# x 4-1/2" 12.6# 13Cr80 / L-80 33 - 8762 8704 - 9019 Structural 5-1/2" Baker S-3 Packer 8622 / 8160 8508, 8622 8054, 8160 Torin Roschinger Operations Manager Aras Worthington aras.worthington@hilcorp.com 907-564-4763 PRUDHOE BAY, Prudhoe Oil Pool Total Depth Effective Depth measured true vertical feet feet feet feet measured true vertical measured measured feet feet feet feet measured true vertical Plugs Junk Packer Measured depth True Vertical depth feet feet Perforation depth Tubing (size, grade, measured and true vertical depth) Packers and SSSV (type, measured and true vertical depth) 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13a.Representative Daily Average Production or Injection Data Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: Subsequent to operation: 15. Well Class after work: Exploratory Development Service StratigraphicDaily Report of Well Operations Copies of Logs and Surveys Run Electronic Fracture Stimulation Data Sundry Number or N/A if C.O. Exempt: ADL 0028284 33 - 8291 N/A N/A 629 639 64716 56598 2546 16 1200 1200 1510 1760 N/A 13b. Pools active after work:Prudhoe Oil Pool 5-1/2" BOT Packer 8508 / 8054 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS Sr Pet Eng: Sr Pet Geo: Form 10-404 Revised 10/2022 Submit in PDF format to aogcc.permitting@alaska.gov Sr Res Eng: Due Within 30 days of Operations No SSSV Installed By Kayla Junke at 3:04 pm, Feb 14, 2024 Digitally signed by Aras Worthington (4643) DN: cn=Aras Worthington (4643) Date: 2024.02.14 14:20:44 -09'00' Aras Worthington (4643) DSR-2/14/24 RBDMS JSB 022724 WCB 2024-06-25 ACTIVITY DATE SUMMARY 2/4/2024 ***WELL S/I ON ARRIVAL*** RAN 3.70''x 20' DMY WHIPSTOCK TO S/D @ 9482' SLM RAN HES 40 ARM CALIPER TO 9,475' SLM (GOOD DATA) ***WELL LEFT S/I ON DEPARTURE, PAD OP NOTIFIED OF WELL STATUS*** 2/5/2024 ***WELL S/I ON ARRIVAL*** (SET 3.63'' OD HEX PLUG IN 7'' 29# CASING) RIG UP YJ ELINE. PT PCE 300 PSI LOW /3000 PSI HIGH RUN #1 W/CH/ 2.75''-CCL/HEX SETTING TOOL/3.63'' HEX PLUG TO SET PLUG AT 9380' MD, CCL TI MID ELEMENT 19.2' CCL STOP DEPTH 9360.8' MD RUN#2 W/CH/2.75'' GUN GAMMA/20'' OF 2.75'' GEO RAZOR GUN 6 spf 60 DEG PHASE TO PERFORATE INTERVAL 9203'-9223' CCL TO TOP SHOT=7.9'' CCL STOP DEPTH= 9195.1'MD ALL GAMMA RAY LOG CORRELATE TO HES THERMAL MULTIGATE DECAY 3 DETECTOR DATED 18-MARCH-2014 JOB COMPLETE ***WELL S/I ON DEPARTURE*** Daily Report of Well Operations PBU H-18 RUN#2 W/CH/2.75'' GUN GAMMA/20'' OF 2.75'' GEO RAZOR GUN 6 spf 60 DEG PHASE TO PERFORATE INTERVAL 9203'-9223' RUN #1 W/CH/ 2.75''-CCL/HEX SETTING TOOL/3.63'' HEX PLUG TO SET PLUG AT 9380' MD, CCL TI MID ELEMENT 19.2' CCL STOP DEPTH 9360.8' MD HEX plug and adperfs are correctly shown on the new WBS, below. -WCB Drilling Manager 02/13/24 Monty M Myers By Kayla Junke at 3:40 pm, Feb 14, 2024 324-082 DSR-2/14/24 BOPE test to 3500 psi. Variance to 20 AAC 25.112(i) for alternate plug placement with fully cemented liner on upcoming production liner completion. SFD 2/15/2024 10-407 MGR08MAR24JLC 3/22/2024 To: Alaska Oil & Gas Conservation Commission From: Ryan Ciolkosz Drilling Engineer Date: February 13, 2024 Re: H-18 Sundry Request Sundry approval is requested to set a whipstock and abandon well H-18 as part of the drilling and completion of the proposed H-18A CTD lateral. Proposed plan for H-18A Producer: Prior to drilling activities, screening will be conducted to drift, caliper for whipstock and MIT. E-line will set the 4- 1/2" x 7" CTD whipstock. Service coil will cement squeeze the whipstock in place, mill XN-nipple and mill the 3.80' window. If unable to set the whipstock or milling the window, for scheduling reasons, the rig will perform that work. See H-18A Permit request for complete drilling details - A coil tubing drilling sidetrack will be drilled with the Nabors CDR2 rig. The rig will move in, test BOPE and kill the well. If unable to set whipstock pre-rig, the rig will set the 4-1/2" x 7" whipstock. A single string 3.80" window + 10' of formation will be milled. The well will kick off drilling in the Sag/Shublik and land in Ivishak Zone 2. The lateral will continue in Zone 2 to TD. The proposed sidetrack will be completed with a 3-1/2" x 3-1/4" x 2-7/8” 13Cr solid liner, cemented in place and selectively perforated post rig (will be perferated with rig if unable to post rig). This completion will completely isolate and abandon the parent Ivishak perfs. This Sundry covers plugging the existing Ivishak perforations via the liner cement job or liner top packer, if the liner lap pressure test fails (alternate plug placement per 20 AAC 25.112(i)). The following describes the work planned. A wellbore schematic of the current well and proposed sidetrack is attached for reference. Pre-Rig Work: (Estimated to start in March 1st, 2024) Reference H-18 permit submitted in concert with this request for full details. 1. E-Line : Set 4-1/2” x 7” whipstock at 9031’ MD and 0 deg RHOS. Pinch point = 9036’ MD 2. Coil : Squeeze cement through WS, mill XN, mill window a. Mill Window (Mill with rig if needed) I. MIRU Service Coil Window Milling Surface Kit II. Give AOGCC 24hr notice prior to BOPE test III. Test BOPE to 3500 psi. MASP with gas (0.10 psi/ft) to surface is 2,506 psi IV. Mill 3.80” window plus 10’ of rat hole V. Single string window exit out of 7” casing 3. Valve Shop : Pre-CTD Tree Work 4. Operations : Remove wellhouse and level pad. Rig Work: (Estimated to start in May 2024) 1. MIRU and test BOPE 250 psi low and 3,500 psi high (MASP 2,506 psi). Give AOGCC 24hr notice prior to BOPE test. 2. Mill 3.80” Window if not done pre-rig 3. Drill build section: 4.25" OH, ~1045' (22 deg DLS planned). 4. Drill production lateral: 4.25" OH, ~1500' (12 deg DLS planned). Swap to KWF if necessary. 5. Run 3-1/2” x 3-1/4” x 2-7/8” 13Cr liner (swap to VBRs and test prior to running liner) 6. Pump primary cement job: 41 bbls, 15.3 ppg Class G, TOC at TOL*. 7. Freeze protect well to a min 2,200' TVD. , p y This completion will completely isolate andp p g ( p abandon the parent Ivishak perfs. Sundry 324-082 PTD 224-011 8. Close in tree, RDMO. * Approved alternate plug placement per 20 AAC 25.112(i) Post Rig Work: 1. Valve Shop : Valve & tree work 2. Coil : RPM, ~100' of i-perfs – See perf procedure attached 3. Slickline : SBHPS, set LTP (if necessary). Set live GLVs. Window Milling Fluids Program: A min EMW of 8.4 ppg KCL. KCl will be used as the primary working fluid and viscous gel sweeps will be used as necessary to keep the hole clean. The well will be freeze protected with a non-freezable fluid (typically a 60/40 methanol/water mixture) prior to service coil’s departure. Additionally, all BHA’s will be lubricated and there is no plan to “open hole” a BHA. Disposal: All Class l & II non-hazardous and RCRA-exempt drilling and completion fluids will go to GNI at DS 4. Fluids >1% hydrocarbons or flammables must go to GNI. Fluids >15% solids by volume must go to GNI. Hole Size: The window and 10’ of formation will be milled/drilled with a 3.80” OD mill. Well Control: BOP diagram is attached. AOGCC will be given at least 24-hour notice prior to performing a BOPE function pressure test so that a representative of the commission can witness the test. Pipe rams, blind rams, CT pack off, and choke manifold will be pressure tested to 250 psi and at least 3,500 psi. BOPE test results will be recorded in our daily reporting system (Alaska Wells Group Reporting System) and will provide the results to the commission in an approved format within five days of test completion. BOPE tests will be performed upon arrival (prior to first entry into the well) and at 7 days intervals thereafter. 20 AAC 25.036 (c)(4)(C) requires that a BOPE assembly must include “a firewall to shield accumulators and primary controls”. A variance is requested based on the result of the joint hazop with the AOGCC. For our operation, the primary controls for the BOPE are located in the Operations Cabin of the Coiled Tubing Unit, and the accumulators are located on the backside of the Operations Cabin (opposite side from the well). These are approximately 70' from the well. Hazards: H is not an H2S pad. H2S reading on H-18: 15 ppm on 10/05/2021. Max H2S recorded on H Pad: 64 ppm. Reservoir Pressure: The estimated reservoir pressure is expected to be 3,386 psi at 8,800 TVD. (7.4 ppg equivalent). Maximum expected surface pressure with gas (0.10 psi/ft) to surface is 2,506 psi (from estimated reservoir pressure). Reservoir pressure will be controlled with a closed circulating system and choke for backpressure to maintain overbalance to the formation. Ryan Ciolkosz CC: Well File Drilling Engineer (907-244-4357) Joseph Lastufka The sundry and permit to drill will be posted in the Operations Cabin of the unit during the window milling operation. Coiled Tubing BOPs Well Date Quick Test Sub to Otis -1.1 ft Top of 7" Otis 0.0 ft Distances from top of riser Excluding quick-test sub Top of Annular 2.75 ft C L Annular 3.40 ft Bottom Annular 4.75 ft CL Blind/Shears 6.09 ft CL 2.0" Pipe / Slips 6.95 ft B3 B4 B1 B2 Kill Line Choke Line CL 2-3/8" Pipe / Slip 9.54 ft CL 2.0" Pipe / Slips 10.40 ft TV1 TV2 T1 T2 Flow Tee Master Master LDS IA OA LDS Ground Level 3" LP hose open ended to Flowline CDR2-AC BOP Schematic CDR2 Rig's Drip Pan Fill Line from HF2 Normally Disconnected 3" HP hose to Micromotion Hydril 7 1/16" Annular Blind/Shear 2-3/8" Pipe/Slips 2 3/8" Pipe/Slips 2 3/8" Pipe/Slips 7-1/16" 5k Mud Cross 2-3/8" Pipe/Slips 3.0" Pipe / Slip HF nneceeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeee Sundry Application Well Name______________________________ (PTD _________; Sundry _________) Plug for Re-drill Well Workflow This process is used to identify wells that are suspended for a very short time prior to being re-drilled. Those wells that are not re-drilled immediately are identified every 6 months and assigned a current status of "Suspended." Step Task Responsible 1 The initial reviewer will check to ensure that the "Plug for Redrill" box in the upper left corner of Form 10-403 is checked. If the "Abandon" or "Suspend" boxes are also checked, cross out that erroneous entry and initial it on the Form 10-403. Geologist 2 If the “Abandon” box is checked in Box 15 (Well Status after proposed work) the initial reviewer will cross out that checkbox and instead, check the "Suspended" box and initial those changes. Geologist The drilling engineer will serve as quality control for steps 1 and 2. Petroleum Engineer (QC) 3 When the RA2 receives a Form 10-403 with a check in the "Plug for Redrill" box, they will enter the Typ_Work code "IPBRD" into the History tab for the well in RBDMS. This code automatically generates a comment in the well history that states "Intent: Plug for Redrill." Research Analyst 2 4 When the RA2 receives Form 10-407, they will check the History tab in RBDMS for the IPBRD code. If IPBRD is present and there is no evidence that a subsequent re-drill has been completed, the RA2 will assign a status of SUSPENDED to the well bore in RBDMS. The RA2 will update the status on the 10-407 form to SUSPENDED, and date and initial this change. If the RA2 does not see the "Intent: Plug for Redrill" comment or code, they will enter the status listed on the Form 10-407 into RBDMS. Research Analyst 2 5 When the Form 10-407 for the redrill is received, the RA2 will change the original well's status from SUSPENDED to ABANDONED. Research Analyst 2 6 The first week of every January and July, the RA2 and a Geologist or Reservoir Engineer will check the "Well by Type Work Outstanding" user query in RBDMS to ensure that all Plug for Redrill sundried wells have been updated to reflect current status. At this same time, they will also review the list of suspended wells for accuracy and assign expiration dates as needed. Research Analyst 2 Geologist or Reservoir Engineer SFD 2/15/2024 182-210 PBU H-18 SFD 2/15/2024 324-082 Operator Name:2. Development Exploratory Service… 5 … … Permit to Drill Number:182-210 6.50-029-20880-00-00 PRUDHOE BAY, PRUDHOE OIL Hilcorp North Slope, LLC 5. Well Name and Number:8. 10.Field/Pools: Well Class Before Work4. Present Well Condition Summary:11. Total Depth: measured feet feet Plugs measured feet feet Effective Depth: measured feet feet Packer measured feet feettrue vertical true vertical 9810 9470 8954 8508, 8622 9546 9470 8054, 8160 Casing: Length: Size: MD: TVD: Burst: Collapse: Structural Conductor 75 20" 35 - 110 35 - 110 1490 470 Surface 2461 13-3/8" 34 - 2495 34 - 2495 4930 2670 Intermediate Production 8931 9-5/8" 33 - 8964 33 - 8479 6870 4760 Perforation Depth: Measured depth: 9447 - 9540 feet True vertical depth:8933 - 9019 feet Tubing (size, grade, measured and true vertical depth)5-1/2" 17# x 4-1/2" 12.6# L80 31 - 8762 31 - 8291 8508 8054Packers and SSSV (type, measured and true vertical depth) 5-1/2" Baker S3 Packer Liner 1123 7" 8687 - 9810 8221 - 9269 7240 5410 12. Stimulation or cement squeeze summary: Intervals treated (measured): N/A Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure 122103570718 87050878 0 50893 1380 1211 Representative Daily Average Production or Injection Data Prior to well operation: Subsequent to operation: 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Name: Contact Email: John Condio John.Condio@hilcorp.com Authorized Name:Stan Golis Authorized Title: Authorized Signature with Date:Contact Phone:907 564 4696 Treatment descriptions including volumes used and final pressure: 13. Sr. Area Operations Manager Operations Performed1. Abandon …Plug Perforations 5 Fracture Stimulate …Pull Tubing … …GSTOR WINJ …WAG …GINJ …SUSP ……SPLUG 16. Well Status after work:Oil 5 Gas … Exploratory …Development 5 Stratigraphic … 15. Well Class after work: …Service WDSPL … 14. Attachments: (required per 20 AAC 25.070.25.071, & 25.283) Daily Report of Well Operations Copies of Logs and Surveys Run true vertical measured9269 Sundry Number or N/A if C.O. Exempt: N/A 5-1/2" BOT Packer 8622 8160 Junk Packer Printed and Electronic Fracture Stimulation Data 5 … … … Operations shutdown … Change Approved Program … N/A Senior Pet Engineer:Senior Res. Engineer: STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS …Suspend …Perforate Other Stimulate Alter Casing…… Plug for Redrill …Perforate New Pool Repair Well …Re-enter Susp Well… 3.Address: 3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 7.Property Designation (Lease Number):ADL 0028284 PBU H-18 9. Logs (List logs and submit electronic and printed data per 20AAC25.071): … Stratigraphic Other: API Number: Form 10-404 Revised 03/2020 Submit Within 30 days of Operations No SSSV Installed By Samantha Carlisle at 8:52 am, Aug 05, 2021 Digitally signed by Stan Golis (880) DN: cn=Stan Golis (880), ou=Users Date: 2021.08.05 08:26:17 -08'00' Stan Golis (880) RBDMS HEW 8/5/2021 DSR-8/10/21 SFD 8/13/2021MGR05AUG2021 ACTIVITY DATE SUMMARY 7/20/2021 ***WELL SHUT IN ON ARRIVAL*** Job Scope: Set Neo Plug / Dump Bail Cement - Isolate Perfs RIG UP AK WIRELINE UNIT. SET TOP OF 4-1/2" X 7" Neo Thru-Tbg Basket Plug at 9470' (basket depth 9480'). DUMP BAIL 5 GAL OF BEADS & CASING CLEANER. DUMP BAIL 9.32 GAL OF 17ppg NEO SUPER SLURRY CEMENT. LAY DOWN FOR THE NIGHT TO LET CEMENT BUILD COMPRESSIVE STRENGTH. ***CONTINUE JOB ON 7/22/21 WSR*** 7/23/2021 ***CONTINUE JOB FROM 7/20/21*** RIH W/ DUMP BAILER. TAG TOC @ 9469'. DUMP BAIL 9.32 GAL OF CEMENT. ESTIMATED TOC @ 9463'. POOH. RIG DOWN ELINE. ***JOB COMPLETE / INFORM PAD-OP TO WAIT 72HRS PRIOR TO POP*** Daily Report of Well Operations PBU H-18 S bp BP Exploration (Alaska) Inc. Attn: Well Integrity Coordinator, PRB -20 Post Office Box 196612 Anchorage, Alaska 99519 -6612 May 18, 2012 \ \_ —, .jo Mr. Jim Regg Alaska Oil and Gas Conservation Commission ; 'AUC 333 West 7 Avenue Anchorage, Alaska 99501 Subject: Corrosion Inhibitor Treatments of GPB H -Pad Dear Mr. Regg, Enclosed please find multiple copies of a spreadsheet with a list of wells from GPB Pad H that were treated with corrosion inhibitor in the surface casing by conductor annulus. The corrosion inhibitor is engineered to prevent water from entering the annular space and causing external corrosion that could result in a surface casing leak to atmosphere. The attached spreadsheet represents the well name, API and PTD numbers, top of cement depth prior to filling and volumes of corrosion inhibitor used in each conductor. As per previous agreement with the AOGCC, this letter and spreadsheet serve as notification that the treatments took place and meet the requirements of form 10 -404, Report of Sundry Operations. If you require any additional information, please contact me or my alternate, Gerald Murphy, at 659 -5102. Sincerely, Mehreen Vazir BPXA, Well Integrity Coordinator i • BP Exploration (Alaska) Inc. Surface Casing by Conductor Annulus Cement, Corrosion inhibitor, Sealant Top -off Report of Sundry Operations (10 -404) Date: 03/17/2012 Corrosion Initial top of Vol. of cement Final top of Cement top off Corrosion inhibitor/ Well Name PTD # API # cement pumped cement date inhibitor sealant date ft bbls ft na gal H -01A 1951100 50029200990100 0.7 NA 0.7 NA 5.10 2/17/2010 H -02A 2021600 50029201000200 0.5 ' NA 0.5 NA 5.10 2/16/2010 H -03 1710190 50029201030000 0.2 NA 0.2 NA 1.70 2/16/2010 H -04A 2031610 50029201040100 0.3 NA 0.3 NA 3.40 2/14/2010 H -05B 2091000 50029201060200 0.3 NA 0.3 NA 5.10 3/9/2010 H -06 1770020 50029202380000 0.1 NA 0.1 NA 0.85 2/16/2010 H -07A 2001280 50029202420100 0.6 NA 0.6 NA 3.40 2/15/2010 H -08 1770230 50029202470000 0.4 NA 0.4 NA 3.40 2/15/2010 H -09 1800640 50029204820000 21.6 5.0 0.8 7/12/2010 3.40 7/8/2011 H -10A 1971900 50029204870100 0.3 NA 0.3 NA 1.70 2/19/2010 H -11 1800680 50029204850000 0.3 NA 0.3 NA 1.70 2/18/2010 H -12 1800670 50029204840000 0.3 NA 0.3 NA 1.70 2/18/2010 H -13A 2090440 50029205590100 0.1 NA 0.1 NA Trace 2/18/2010 H -14B 2071160 50029205800300 0.1 NA 0.1 NA Trace 2/18 /2010 H -15 1810610 50029205910000 0.4 NA 0.4 NA 3.40 2/18/2010 H -16 2000650 50029205920200 0 NA NA NA NA NA H -17A 1971520 50029208620100 21.5 6.0 0.4 7/12/2010 1.70 7/8/2011 -lb H -18 1822100 50029208800000 0.1 NA 0.1 NA 0.50 2/27/2010 H -19B 1980940 50029208830200 3.5 NA 3.5 NA 23.80 2/24/2010 H -20 1830070 50029208960000 6.7 NA 6.7 NA 47.60 2/22/2010 H -21 1860710 50029215750000 0.5 NA 0.5 NA 3.40 2/15/2010 H -22A 1970480 50029215880100 0.1 NA 0.1 NA 0.85 2/15/2010 H -23A 1950850 50029217940100 5 NA 5 NA 32.30 2/17/2010 H -24A 2071330 50029215120100 0.7 NA 0.7 NA 3.40 2/28/2010 H -25 1852680 50029214780000 0.1 NA 0.1 NA 0.85 2/26/2010 H -26 1852770 50029214870000 2.3 NA 2.3 NA 17.90 2/23/2010 H -27A 2030590 50029214560100 0.1 NA 0.1 NA 0.85 2/21/2010 1 H -28 1880440 50029218060000 0.5 NA 0.5 NA 3.40 2/17/2010 H -29A 1980380 50029218130100 5.2 NA 5.2 NA 57.80 2/16/2010 H -30 1880350 50029218000000 1.7 NA 1.7 NA 11.90 2/16/2010 H -31 1940140 50029224440000 0.7 NA 0.7 NA 5.10 2/18/2010 H -32 1940250 50029224490000 0.3 NA 0.3 NA 1.70 2/18/2010 H -33 1940380 50029224580000 0.1 NA 0.1 NA 1.70 2/16/2010 H -34 1971640 50029228030000 1.3 NA 1.3 NA 13.60 2/19/2010 H -35 1951490 50029226000000 1.7 NA 1.7 NA 15.30 2/16/2010 H -36A 2000250 50029226050100 1.3 NA 1.3 NA 11.90 2/17/2010 H -37A 2000970 50029227720100 1.2 NA 1.2 NA 10.20 2/20/2010 H -38 2081670 50029234020000 Dust cover NA NA NA NA 3/17/2012 03/18/09 ~~~I~/It~~1-~G Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 Anchorage, AK 99503-2838 ATTN: Beth N0.5133 „ ~~ ~ ~ •~ ~ ~ '' Company: State of Alaska ,e';, /~-~" ' }~~ ~ `' `'~ L ~ '~'~ Alaska Oil & Gas Cons Comm Attn: Christine Mahnken 333 West 7th Ave, Suite 100 Anchorage,AK 99501 1 ~~ weu .~.,h ~ ~j~~~ r `y ~ y l'~ ~~ ti ~l,>Fl " l 4-}, ~ y /~,.• ,~ qwV~' tC'd ~- J-27A AY3J-00010 CBL - j 02/21/09 1 1 S-107 AWJB-26 MEM L L U /_- ~ 02/25/09 1 1 09-34A AZ4D-00005 USIT (REVISED) - 02/07/09 1 1 V-210 AWJB-00025 INJECTION PROFILE 02/23/09 1 1 MPB-22A AXBD-00005 MEM SCMT & TEMP PROFILE ~ 12/23/08 1 1 V-219 12103700 USIT (REVISION #2) jS ~ ~ ~ 11/21/08 1 1 11-18 BOCV-00006 PRODUCTION LOG / G/ 03/02/09 1 1 B-25 AVY5-00023 USIT - / r- /~ 03/06/09 1 1 N-18A AYKP-00013 PRODUCTION LOG p~- j~}S j 03/11/09 1 1 F-18 AVY5-00022 USIT ~ ~- ~"%':' _ "~3' ' " 03/04/09 1 1 3-19/R-28 AZ4D-00009 LDL j I;,l • 03/06/09 1 1 V-117 BOOR-00003 MEM PRODUCTION PROFILE ~p - ( ~ 03/12/09 1 1 V-211 AY3J-00014 (PROF/RST WFL - ~ 03/16/09 1 1 V-214 AY3J-00013 (PROF/RST WFL - 03/15/09 1 1 K-06B AWJI-00017 MCNL ~ - 01/28/09 1 1 L5-15 12113027 RST ~ /O ~} (• ~ 12/09/08 1 1 07-18 12071915 RST 9 v 12/01/08 1 1 15-15C AWJI-00015 MCNL _ ( 01/02/09 1 1 W-218 40018337 OH MWD/LWD EDIT / '12/07/08 2 1 R-41 40018496 OH MWD/LWD EDIT _i5 ( 01/04/09 2 1 H-18 11999064 RST / - t 12/03/08 1 1 ~. ~~ • ~~ .r -.-......-.-rrv~wr ,~~v~~r ~ v ~ v~4in~~~~a /~~YV nG1 Vn1~lI'TV VIYC liVrT CAVn 1 V. BP Exploration (Alaska) Inc. Petrotechnical Data Center LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99508 Date Delivered: ~ 3~~d!- ; s ~ Cojo~ re.Gi ~ ec~1 3 ~a~o~ Alaska Data & Consulting Services 2525 Gambell $tr~ t~ Sujte,400 Anchorage, AK~'9~•2898 - h ATTN: Beth Received by: kA ~ t~ ~~, ,~ ~~~ ^l~ ~{'" ~~ • OPERABLE: H-18 (PTD #182210~Mitigated high OA Pressure Page 1 of 2 • Regg, James B (DOA) From: NSU, ADW Well Integrity Engineer [NSUADWWeIIlntegrityEngineer@BP.com] , ~~ i~~Z~2e~?~ Sent: Friday, January 23, 2009 9:28 AM To: Regg, James B (DOA); Maunder, Thomas E (DOA); GPB, Area Mgr West (GC2/WRD); GPB, GC2 OTL; GPB, GC2 Wellpad Lead; GPB, Well Pad HU; Rossberg, R Steven; Engel, Harry R; NSU, ADW Well Operations Supervisor; GPB, Wells Opt Eng; GPB, Optimization Engr; GPB, Prod Controllers Cc: Townsend, S. Eliot; NSU, ADW Well Integrity Engineer Subject: OPERABLE: H-18 (PTD #1822100) Mitigated high OA Pressure Ail, As part of the PPPOT-IC on well H-18 (PTD #1822100), the wellhead seals were re-energized by tightening the lock down screws, A positive pressure pack-off test (PPPOT-IC) was conducted and passed on the inner casing. A subsequent O_A repressors test was then conduc#ed and passed. The well has been reclassified as Operable. ~A recent TIO plot has been included. The high IA pressers shown on the plot is due to the OA rspressure test where pressure is applied to the IA and the OA pressure is monitored. Please let me know if you have any questions. Thank you, Anna ~u6e, ~? E. Well Integrity Coordinator GPB Wells Group Phone; {907) 659-5102 Pager; {907) 659-5100 x1154 ~,~. , From: NSU, ADW Well Integrity Engineer Sent: Friday, January 09, 2009 1:32 PM To: 'Regg, James B (DOA)'; 'Maunder, Thomas E (DOA)'; GPB, Area Mgr West (GC2/WRD); GPB, GC2 OTL; GPB, GC2 Wellpad Lead; GPB, Well Pad HU; Rossberg, R Steven; Engel, Harry R; NSU, ADW WeII Operations Supervisor; GPB, Wells Opt Eng; GPB, Optimization Engr; GPB, Prod Controllers Cc: NSU, ADW Well Integrity Engineer; Quy, Tiffany Subject: UNDER EVALUATION: H-18 (PTD #1822100) Sustained OA Pressure All, Well H-18 (PTD #1822100) has been found with sustained casing pressure on the OA. The TIOs were SSV/1320/1030 psi on 01/04/09. An OA repressurization test completed on 01/09/08 indicates an overnight build up rate of -345 psi. The well has been reclassified as Under Evaluation and placed on a 28-day clock. The plan forward for the well is as follows: 1. W: PPPOT-IC 2. D: DART to evaluate if BUR has changed A wellbore schematic and TIO plot have been included for reference. Please call with any questions or concerns. 1 /27/2009 OPERABLE: H-18 (PTD #182210~Mitigated high OA Pressure Page 2 of 2 • Thank you, Andrea Hughes Well Integrity Coordinator Office: (907) 659-5102 Pager: (907) 659-5100 x1154 1 /27/2009 N N ~_ a a Qoo c ~?oooo ~~~ ~~ • ,T~ -~ ~~- 0 s O O O m O -~. i7 O O M1 N '~.. N O O N ^. iV CO O i ~~ N ~7 {D O N fl Q? r ~~ i'J i ~d tp O ~~ 'T O GO O ?'O O G PBU H-18 TIO Plot PTD 188-210 1 /9/2009 ~._ I ~.or~ ,~ 1.000 -.- T~ -.- a oa -.-- oon -+ oooa . On TREE = 6-3/8" MCEV OY WELLHEAD= MCEVOY ACTUATOR= OTIS KB. ELEV = 80.35' BF. ELEV = 45.28' KOP = 2900' Max Angle = 27 @ 6100' Datum MD = 9391' DatumTVDss= 8800' 13-3/8" CSG, 72#, L-80, ID = 12.347" I~ 2495' CAS LIFT MANDRELS ST MD TVD DEV TYPE VLV LATCH PORT DATE 4 3251 3240 16 MMG DOME RK 20 11 /05/03 3 5820 5591 26 MMG SO RK 20 11/05/03 2 7548 7159 21 MMG DMY RK 0 10/25/03 1 8419 7971 21 MMG OMY RK 0 10/25/03 Minimum ID = 3.725" @ 8718' 4-1 /2" OTIS'XN' NIPPLE 5-1/2" TBG, 17#, 13CR-80, .0232 bpf, ID= 4.892" 8551' ~ 5-1/2" TBG, 17#, L-80, .0232 bpf, ID = 4.892" I TOP OF 7" LNR I~ 8687' 4-1/2" TA~.PBE,12.6#, L-80, .0152 bpf, ID = 3.958" I~ 8761' 9-5/8" CSG, 47#, L-80, ID = 8.681" PERFORATION SUMMARY REF LOG: SWS-BHSS 01!03/83 ANGLEATTOPPERF: 21 @ 9392' Note: Refer to ProduStion DB for historiSal pert data SQE SPF INTERVAL Opn/Sqz DATE 3 3/8' 6 9392 - 9462 S 08!25/98 2 7/8' 6 9447 - 9459 O 03/01/98 2 7/8' 6 9459 - 9467 O 03/01/98 3 3/8' 6 9459 - 9467 O 10/23!93 3 3/8' 6 9462 - 9467 O 11/18/91 3 3/8' 6 9480 - 9496 S 08/14/91 3 3/8' 4 9496 - 9540 O 03/30/93 PBTD 9765' 7" LNR, 26#, L80, .0383 bpf, ID = 6.276" 9810' H - w ~ I SAFETY NOTES: ***5-1 /2" CHROME TBG*** 2076' ~~5-1/2" HES X NIP, ID = 4.562" $4$7' 5-1/2" HES X NIP, ID = 4.562" 8508' 9-5/8" X 5-1/2" BKR S-3 PKR, ~ = 4.75" 8530' 5-1/2" HES X NIP, ID= 4.562" 8554' UNIQUE MACHINE OVERSHOT 8598' -~BTM PBR SEAL ASSY 8622' 9 5/8" x 5-1/2" BOT PKR, ID = 4.75" 8633' 5-1/2" X 4-1/2" XO 8674' 4-1/2" OTIS X NIP, ID = 3.813" 8718' ~ 4-1 /2" OTIS XN NIP, ID = 3.725" 8761' 4-1 /2" TBG TAIL, ID = 3.958" 8737' ELMD•TTLOGGED 01/07/83 9339' I~ MA RK ER JOINT DATE REV BY COMMENTS DATE REV BY COMMENTS 01/08/83 ORIGINAL COMPLETION 11/24/03 CJS/TLH RWO (10/26/03) 05/01/01 RNIKAK CORRECTIONS 11/05/03 MWTLH GLV GO 11/14/03 MWTLH BP FISH BP ELEMENT (11 /14/031 PRUDHOE BAY UNIT WELL: H-18 PERMff No: 1822100 API No: 50-029-20880-00 Sec. 21, T11N, R13E BP Exploration (Alaska) Schlumberger Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 Anchorage, AK 99503-2838 A TTN: Beth Well icr5-a;L 0.5. 07-03A 20J -1c.f:fK-10B 'Q(;;-o{1 0.5. 02-1SA !'1?-ll!J-- 0.5. 18-13A 203.lJ./{~ G-12B ~_ µ ( 0.5. OS-26A ,: &-;3. Wf-15-04A Tq5'-ð3b .18-02A 1"1/_o9õ....,è"18-04B n5-0'S§L 1-01 :'j8-i'?R-L5-17 ",'1 .,¡/1H-18 '.'ð '- -_.v 2-62/Q-17 ¡B&-'t8. LS-15 ~ LS-15 .~q; LS-15 \ L5-15 '-C¡O-oifir E-17 10- ry.{ - G-15A Job# 10715406 10715402 10715404 10715395 1071S391 10715420 10715374 10621764 10708056 10913000 10900124 10703975 10900129 10708050 10563129 10672368 10913848 10703983 10679055 MCNL MCNL MCNL MCNL MCNL MCNL MCNL RST RST USIT USIT RST RST RST RST RST RST RST RST SCANNED JUN 1 62005 Log Description PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COpy EACH TO: BP Exploration (Alaska) Inc. Petrotechnical Data Center LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99508 Date Delivered: ·~~t~ Date 06/03/04 05/16/04 05/18/04 04/16/04 03/21/04 08/19/04 01/14/04 02/23/04 03/05/04 12/25/04 11/30/04 02/17/04 12/24/04 02/07/04 11/15/03 04/16/04 09/26/04 04/09/04 02/02/04 Blueline NO. 3354 /;?? - ¿::(I 0 02/28/05 Company: State of Alaska Alaska Oil & Gas Cons Comm Attn: Helen Warman 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Field: Prudhoe Bay Color Prints 1 1 1 1 1 1 1 1 1 1 1 1 / J ~ CD 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 / -' 1 V Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 Anchorage, AK 99503-2 38 . / ATTN: Beth - // J Receive r¿JL.v-- Uð~~ if -- 1. Operations Performed: Abandon 0 Alter Casing D Change Approved Program D 2. Operator STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS Suspend 0 RepairWellŒ Pull TubingD Operation Shutdown D Plug Perforati~nsD Perforate New Pool 0 4. Current Well Class: Perforate 0 WaiverD Stimulate D Time ExtensionO Re-enter Suspended Well 0 5. Permit to Drill Number: 182.2100 Name: BP Exploration (Alaska), Inc. Development ŒJ Stratigraphic 0 9. Well Name and Number: H.18 10. Field/Pool(s): Prudhoe Bay Field / Prudhoe Oil Pool 3. Address: P.O. Box 196612 Anchorage, Ak 99519.6612 7. KB Elevation (ft): ExploratoryD ServiceD 6. API Number 50-029.20880-00-00 80.40 8. Property Designation: ADL-o028284 11. Present Well Condition Summary: Total Depth measured 9810 true vertical Effective Depth measured true vertical Casing Conductor Liner Production Surface Length 68 1123 8931 2461 Perforation depth: feet 9268.5 feet Plugs (measured) Junk (measured) 9765 feet 9227.0 feet Size 20" 91.5# H-40 7" 26# L-80 9.5/8" 47# L.80 13-3/8" 72# L-80 TVD Burst 1490 7240 6870 4930 MD 35 103 35.0 - 115.0 8687 - 9810 8220.8 - 9268.5 33 - 8964 33.0 - 8479.2 34 - 2495 34.0 - 2494.9 Measured depth: 9462 - 9467,9496 - 9520,9520 - 9540 OtherD None 9546 Collapse 470 5410 4760 2670 True vertical depth: 8946.65 - 8951.3,8978.23 - 9000.49,9000.49 - 9019.03 ;,:( E~ c:: f:~ 1\/:-: [: Tubing ( size, grade, and measured depth): 5-1/2" 17# 13Cr80 @ 31 8572 5-1/2" 17# L-80 @ 8572 8633 4-1/2" 12.6# L-80 @ 8633 8761 5-1/2" BOT Packer @ 8622 5-1/2" Baker S-3 Packer @ 8519 \;AR 1 8 200' Packers & SSSV (type & measured depth): ^!~~;;:,G:ì 'G-,;":>:",,C'H:.:!F;¡;~!1 ¡lr;!;:;(¡[:.':;'" 12. Stimulation or cement squeeze summary: Intervals treated (measured): 35' - 103' in OOA, 34' - 922' in OA Treatment descriptions including volumes used and final pressure: 12.4 bbls into OOA, 51.6 bbls into OA of Arctic Set 1 Cement @ 180 psig Representative Daily Averaae Production or Iniection Data Gas-Met Water-Bbl Casing Pressure 45.4 2207 1500 13 Prior to well operation: Subsequent to operation: 14. Attachments: Copies of Logs and Surveys run - Oil-Bbl 1361 1294 1500 45.4 2001 15. Well Class after proposed work: Exploratory 0 DevelopmentŒ Tubing Pressure 1699 1722 ServiceD 16. Well Status after proposed work: Operational Shutdown 0 OilŒJ GasD WAG 0 GINJD WINJD WDSPLD Prepared by Garry Catron (907) 564-4657. SUndry Number or N/A if C.O. Exempt: N/A Title Production Technical Assistant Daily Report of Well Operations. ! 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Garry Catron Printed Name Garry Catron JJrh1ð ~ Signature Form 10-404 Revised 12/2003 Phone 564-4657 0 R I GI NAL £Ø)MSBfL Date 3/15/04 MAR 1 ~ 2ßOlt H-18 DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS EVENT SUMMARY 11/14/03 PulllBP from 8560'. Rubber elements missing from IBP. Drift wI 4.16 four prong wire grab to 8562' SLM. Drift w/3.28 four prong wire grab, tag TD @ 9546' SLM. Did not recover any rubber elements. 12/12/03 T/I/O= 116011460/880. TEMP= 146/P. MEASURE OOA CASING DEPTH. (PREP FOR OOA LOAD). OOA CASING DEPTH WAS @ 68'. ATTEMPTED TO PUT HOLES IN ABSORB PROTECTION RING, RING KEEPS SLIPPING DOWN HOLE. INSTALLED HEATER ON WELL HEAD. 12/24/03 Performed top job on 20" Conductor X 13-318" casing with 64 bbls of 15.7 ppg Arctic Set 1 cement. FLUIDS PUMPED BBLS 64 64 Arctic Set 1 Cement TOTAL Page 1 TREE = 6-3/8" MCEVOY WB.LHEAD= MCEVOY ACTUATOR= OTIS KB. B.EV = 80,35' BF. B.EV = 45.28' KOP = 2900' Max Angle = 27 @ 6100' Datum MD = 9391' Datum lVDss= 8800' 113-3/8" CSG, 72#, L-80. ID = 12.347" 1-\ 2495' Minimum ID = 3.725" @ 8718' 4-1/2" OTIS 'XN' NIPPLE 15-1/2" TBG, 17#, 13CR-80, .0232 bpf, ID = 4.892" 1-\ 8551' 15-1/2" TBG, 17#, L-80, .0232 bpf, ID = 4.892" 1-\ 8627' ITOPOF 7" LNR 1-\ 8687' 14-1/2" TAILPlÆ, 12.6#, L-80, .0152 bpf, ID = 3.958" 1-\ 8761' 19-5/8" CSG, 47#, L-80, ID = 8.681" H 8964' PERFORATION SUMMARY REF LOG: SWS-BHSS 01/03/83 ANGLEAT TOP PERF: 21 @ 9392' Note: Refer to ProduStion DB tor historiSal perf data SIZE SPF INTERVAL Opn/Sqz DATE 3 3/8' 6 9392 - 9462 S 08/25/98 27/8' 6 9447 - 9459 0 03/01/98 2 7/8' 6 9459 - 9467 0 03/01/98 33/8' 6 9459 - 9467 0 10/23/93 3 3/8' 6 9462 - 9467 0 11/18/91 33/8' 6 9480 - 9496 S 08/14/91 3 318' 4 9496 - 9540 0 03/30/93 I PBTD H 17" LNR, 26#, L80, .0383 bpf, ID = 6.276" 1-1 9765' 9810' ~ H-18 I SAFETYNOTES: ***5-1/2" CHROMETBG*** ~ L - X ;& ~ ) ~ ) :8: & \ / "I I I ~ 'r ~ DATE REV BY COMMENTS DATE REV BY COMMENTS 01/08183 ORIGINAL COMPLETION 11/24/03 CJSfTLH RWO (10/26/03) 05/01/01 RNIKAK CORRECTIONS 11/05/03 MI-VTLH GLV C/O 11/14/03 MI-VTLH IBP FISH 2076' ST MD lVD DEV 4 3251 3240 16 3 5820 5591 26 2 7548 7159 21 1 8419 7971 21 8487' 8508' 8530' 8554' 8598' 8622' 8633' 8674' 8718' 8761' 8737' 9339' 9546' H5-1/2" HES X NIP. ID = 4.562" I GAS LIFT MANDRB.S TYÆ VLV LATCH PORT MMG DOME RK 20 MMG SO RK 20 MMG DMY RK 0 MMG DMY RK 0 DATE 11/05/03 11/05/03 10/25/03 10/25/03 H5-1/2" HES X NIP, ID = 4.562" I 1-\9-5/8" X 5-1/2" BKR S-3 PKR, ID = 4.75" I 1-\5-1/2" HES X NIP, ID = 4.562" I HUNIQUEMACHINEOVERSHOT I 1-\ BTM PBR SEAL ASSY I 1-\95/8" x 5-1/2" BOT PKR, ID = 4.75" 1 H5-1/2" X 4-1/2" XO 1 1-\4-1/2"OTISXNIP,ID=3.813" 1 1-14-1/2" OTIS XN NIP, ID = 3,725" 1 1-\4-1/2"TBGTAIL, ID=3.958" 1-1 B.MD- TT LOGGED 01/07/831 1-\ MARKER JOINT I I-\IBPB.EMENT(11/14/03) 1 PRUDHOE BA Y UNIT WB.L: H-18 PERMfTNo: 1822100 API No: 50-029-20880-00 See. 21,T11N, R13E BP Exploration (Alaska) - " " TÆE = 6-3/8" M:;EVOY WB.LI-EAD= M:;EVOY ACTUATOR= OTIS KB. B.EV = 80.35 BE B.EV = 45.28' KOP = 2900' Max Angle = 'Zl @ 6100' 113-318" CSG, 72#, H DatumMD= 9391' L-80,1O= 12.347" I ' Datum TVDs s= 8800' 17" TBG, 26#, L-80, .0383 bpf, 10 = 6.276" H 2495' J 2932' Minimum ID = 3.725" @ 8718' 4-1/2" OTIS 'XN' NIPPLE 15-1/2" TBG, 17#, L-80, .0232 bpf, 10 = 4.892" H 8627' 1 ITOPOF T LNR H 8687' 14-1/2" TALPlÆ.12.6#, L-80, .0152 bpf, 10 = 3.958" H 8761' 19-5/8"CSG, 47#, L-80,ID =8.681" H n \ d S~~eøvL-f;'c... H-18 / ~ Svfd Iq~ tt-f '1-3: ~'I I ~k"";"(~Prf .~. ¡.«(1)',mlde t} 7J . 1 2932' H7" X 5-1/2" XO I f 1 2943' H5-1/2"OllS SSSV LAND. NP,ID=4.562 I . GAS LIFT M6.t<ORB.S ST MD lVD ŒV TYÆ LATa-! VLV 10 3108 3021 13 ellS LBD RA 1.5" 9 4947 4716 24 OllS LBD RA 1.5" j 8 6238 5885 26 ellS LBD RA 1.5" 7 7110 6673 24 OllS LBD RA 1.5" 6 7603 7130 21 OllS LBD RA 1.5" 5 7759 7275 21 OllS LBD RA 1.5" 4 8082 7577 21 OllS LBD RA 1,5" 3 8230 7714 22 OllS LBD RA 1.5" 2 8306 7785 21 OllS LBD RA 1.S" 1 8467 7935 21 OllS LBD RA 1.S" 8540' HS-1/2"BKRSLIONGSLV, 10=4.313" I - 8598' - BOT PBRSfAL ASSY 1 8586' - 3-318" IBPI 8622' - 9 518" x 5-1/2" BOT A<R. 1D=4.75 I , 8633' H5-1/2" X 4-1/2" XO 1 1 8674' H4-1/2"OllS ')(' NP,ID=3,813 1 1 868T H7"LNRHGR I I 8718' H4-1/2" OllS ')(N' NP,ID=3.725" I I 8761' H4-1/2"TBGTAILID=3.958 l 873T HB..MDO1,Q7I83 ..LL. { r ð\ Ï- I I I 8964' ¡.- PERFORATION SUMMARY REF LOG: SWS-BHSS 01,03/83 AI\GLE AT TOP~: 21 @ 9392 N:Jte: Refer to A'oduStion DB for historiSaI perf data SIZE SA= INTERVAL Opn/Sqz DATE 3 318' 6 9392-9462 S 08/25/98 27/8' 6 9447-9459 0 03,01/98 27/8' 6 9459-9467 0 03,Q1/98 3 318' 6 9459-9467 0 10/23/93 3318' 6 9462-9467 0 11/18/91 3 318' 6 9480-9496 S 08/14/91 3 318' 4 9496-9540 0 03(30/93 ~ 9765' 17" LNR,26#, L80, .0383 bpf,ID=6.276 H 9810' [)o\ 1£ REV BY 01/08183 ORIGINAL OOM'LEIlON 02116101 SlS-SLT OONVERrEDTOCANVAS 03101/01 SlS-t.G ANAL 05101/01 RN/KAK OORRECfIONS -- COMfvENTS I SAFETY OOlES 1 ~ ' 1 9339' H MARKER JOINT I fRLDHOE BA Y um WH.L: 1+18 PERMIT No: 82-2100 API No: 50-029-20880-00 See. 21, T11N,R13E BP exploration (Alaska) CANVÞS UPDATE: 03/01101 STATE OF ALASKA .~- ALASKA( ~ ,L AND GAS CONSERVATION CO~,.,MISSION REPORT OF SUNDRY WELL OPERATIONS 1. Type of Request: [] Abandon [] Suspend El Operation Shutdown [] Perforate [] Variance [] Other [] Alter Casing I~ Repair Well [] Plug Perforations [] Stimulate [] Time Extension [] Change Approved Program I~ Pull Tubin.q [] Perforate New Pool [] Re-Enter Suspended Well [] Annular Disposal 2. Operator Name: 4. Current Well Class: 5. Permit To Drill Number BP Exploration (Alaska) Inc. [] Development [] Exploratory 182-210 3. Address: [] Stratigraphic [] Service 6. APl Number: P.O. Box 196612, Anchorage, Alaska 99519-6612 50-029-20880-00-00 7. KB Elevation (ft): KBE = 80.40' 9. Well Name and Number: PBU H-18 8. Property Designation: 10. Field / Pool(s): ADL 028284 Prudhoe Bay Field / Prudhoe Bay Pool 11. Present well condition summary Total depth: measured 9810 feet true vertical 9269 feet Plugs (measured) Effective depth: measured 9765 feet Junk (measured) true vertical 9227 feet Casing Length Size MD TVD Burst Collapse Structural Conductor 110' 20" x 30" 110' 110' Surface 2495' 13-3/8" 2495' 2495' 4930 2670 Intermediate 8964' 9-5/8" 8964' 8479' 6870 4750 Production Liner 1123' 7" 8687'- 9810' 8221'- 9269' 7240 5410 Perforation Depth MD (ft): 9447'- 9540' Perforation Depth TVD (ft): 8933'- 9019' Tubing Size (size, grade, and measured depth): 5-1/2", 17#, 13Cr80 / x 4-1/2", 12.6#, L-80 to 8762' Packers and SSSV (type and measured depth): 9-5/8" x 5-1/2" Baker packer; Baker 'S-3' packer; 5-1/2" 8622'; 8508'; 2076' ':i'i¥',~ .... "1 Otis 'X' Nipple ,,~ ,,,,~. ',. '; ., ,,,,, ~' .. ,,,, 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment description including volumes used and final pressure: 13. Representative Daily Average Production or Injection Data OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure TubinR Pressure Prior to well operation: Subsequent to operation: ~4. Attachments: 15. Well Class after proposed work: .......... ~ Copies of Logs and Su~eys run ~ Exploratory ~ Development ~ Service ~ Daily Repod of Well Operations 16. Well Status after proposed work: M Oil D Gas ~ WAG ~ GINJ D WlNJ D WDSPL i i 17. I hereby ce~ify that the foregoing is true and correct to the best of my knowledge. ~ Sundw Number or N/A if C.O. Exempt: i Contact David Reem, 564-5743~ NIA ,,, ,,, ..... , Printed Name Terrie Hubble Title Technical Assistant Phone ¢~4-~6~8 Date [ Prepared By Name/Number: , Terrie Hubble, 564-4628 Signature ~ ~ t ~ Form 10-404 Revised 2~2003 BFL Well: H-18 RWO Accept: 10/11/03 Field: Prudhoe Bay Unit Spud: N/A APl: 50-029-20880-00 Re lease: 10/25/03 Permit: 182-210 Rig: Nabors 4ES Date PRE-RIG WORK 08/23/03 DRIFTED FOR 4-3/16" CHEM CUTTER W/4.25" CENT TO 8572'. TAGGED TOP OF IBP @ 8572' SLM, DUMPED APPROX 12' SLUGGITS ON TOP OF IBP. TAGGED TOP OF SLUGGITS @ 8560' SLM. 09/25/03 A 4 3/16" CHEMICAL CUTTER WAS FIRED @ 8550'. THE ZONE WAS PREPARED BY FIRING A 12' 2 STRAND STRING SHOT. LOG WAS CORRELATED TO CAMCO "COLLAR LOG" DATED 11-07-90. 09/26/03 T/I/O=0/0/0 ---CIRC OUT WELL W/1%KCL WATER/FREEZE PROTECT TXIA DIESEL/CMIT TX IA TO 35OO PSI. 09/27/03 CIRC-OUT WELL W/842 BBLS 1% KCL WATER/FREEZE PROTECT TXIA W/142 BBLS DIESEL/ CMIT TXIA TO 3500 PSI, PASSED. FINAL WHP'S=0/0/0. 09/30/03 TIO = 0/0/0. PPPOT-T PASSED, PPPOT-IC FAILED (PRE-RIG). BLED TUBING HANGER TEST VOID TO 0 PSI. PRESSURED TO 5000 PSI, LOST 50 PSI IN 30 MINUTES. ALL LDS FUNCTIONED OKAY. PPPOT-IC FAILED. BLED lC HANGER TEST VOID TO 0 PSI. PRESSURED TO 3500 PSI, LOST 1500 PSI IN 30 MINUTES. ALL LDS FUNCTIONED OKAY. 10~09~03 T/I/O=SSVNAC/O. MONITOR WHP'S (PRE-RWO). BP EXPLORATION Page 1 of 12 Operations Surnrna Report Legal Well Name: H-18 Common Well Name: H-18 Spud Date: 12/23/1982 Event Name: WORKOVER Start: 10/10/2003 End: 10/25/2003 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 10/25/2003 Rig Name: NABORS 4ES Rig Number: 4ES Date From - To Hours Task Code NPT Phase Description of Operations ,,, 10/11/2003 00:00 - 06:00 6.00 MOB P PRE Move Rig, Modules, and Equipment to Well H-18. 06:00 - 08:00 2.00 MOB P PRE Spot Sub Base over Well. Spot Pit, and Pipe Shed. 08:00 - 09:00 1.00 MOB P PRE Raise and Scope Derrick. Take on 140 deg F. Sea Water in Pits. Accept Rig at 09:00 hrs. 09:00 - 10:30 1.50 RIGU P PRE Continue to take on Sea Water. Rig up lines to Tree. Rig lines to Tiger Tank. 10:30-12:00 1.50 WHSURiP DECOMP Test lines to 3,500 psi. Pick Up Lubricator. PulIBPV. Lay down BPV and Lubricator. 12:00 - 12:30 0.50' KILL P DECOMP Hold Spud and PJSM with Co Rep, Tool Pusher, and Crew. 12:30 - 17:30 5.00 KILL P DECOMP Beging to kill well with 140 deg F. Attempt to reverse out diesel freeze protect from tubing, however, Annulus pressured up to 2,000 psi with no returns. Bleed pressure. Double ckeck valve alignment on choke maniford and Tree. Made a second attempt to Reverse with same results. Line up to pump down Tubing. Pumping down Tubing at 1 bpm/2,100 psi. Tiny stream for returns at surface. IBP in tailpipe appears to be leaking by. Increased to 2 bpm. Pumped 100 bbls to warm up upper 2,000-ft. Line up to Reverse. Reverse Annular Vol at 1 bpm/2,000 down to 2,000-ft. Line up to pump down Tubing. Pumping down Tubing at 2 bpm/1,800 psi. Starting to get returns. Increase pump rate as returns get better. Continue circulating well at 5 bpm/1600 psi. Getting full returns. 17:30 - 18:00 0.50 WHSUR P DECOMP Monitor well, annulus on vacum. Tubing static. Install TWC & test to 1000 psi, OK. Blow down lines & pump. 18:00 - 21:00 3.00 WHSUR P DECOMP Bled off hanger void. N/D adapter flange & tree. LID same. Had to cut off 3 bolts on tubing spool due to corrosion. 21:00 - 23:30 2.50 BOPSUR P DECOMP N/U BOPE. Change upper rams for 5 1/2" tubing. 23:30 - 00:00 0.50 BOPSUF~ P DECOMP Begin pressure testing BOPE as AOGCC requirements. 10/12/2003 00:00 - 02:30 2.50 BOPSUF~ P DECOMP Test BOPE. LP 250 psi, HP 3500 psi. BOP test witnessing waived by Chuck Scheve w/AOGCC. Tested blinds, pipe, Kelly, annular, Koomey, choke manifold & floor valves as per AOGCC requirements. 02:30 - 03:30 1.00 WHSUR P DECOMP P/U lubricator. Pull TWC & LID same. 03:30 - 04:00 0.50 WHSUR P DECOMP P/U landing Jt & X-over. M/U into hanger. BOLDS. 04:00 - 05:00 1.00 PULL P DECOMP Pull Hanger to floor. Tubing came free @ 200K. Weight then dropped off to 175K. Cut & band control lines. Break out & LID hanger. 05:00 - 06:00 1.00 PULL P DECOMP R/U & circulate bottoms up. Pump @ 4.5 BPM, 200 psi. Took 6 bbls to fill hole & break circulation. 06:00 - 06:30 0.50 PULL P DECOMP PJSM. Lub and service Rig. 06:30 - 11:00 4.50 PULL P DECOMP Rig up Control Line Spooling Unit. POOH and single down 7" L-80 Tbg in Pipe Shed. Spool up Control Lines. Total 7" Jts - 76. Lay down 7" x 5 1/2" XO. Lay down SSSV. Recovered 34 Clamps and 6 Bands. 11:00 - 11:30 0.50 PULL P DECOMP Rig down Spooling Unit. Rig down 7" handling equipment. 11:30 - 16:00 4.50 PULL P DECOMP Rig up 5 1/2" handling equipment. Continue to POOH. Single down 5 1/2" L-80 Tbg in Pipe Shed. Lay down a total of 125 jt, Sliding Sleeve, 10 GLMs. Chemical Cut Stub is 20.90-ft. Clean cut. Slight swelling...5.60" 16:00-17:00 1.00 BOPSUFP DECOMP Set test plug & change out 5 1/2" rams to 2 7/8" x 5' variable rams. Test door seals, LP 250 psi, HP 3500 psi. Install Wear Ring. 17:00 - 18:30 1.50 CLEAN P DECOMP RID completion handling tools. Clear & clean rig floor. R/U Printed: 10/27/2003 11:33:12 AM BP EXPLORATION Page 2 of 12 Operations Surnrna Report Legal Well Name: H-18 Common Well Name: H-18 Spud Date: 12/23/1982 Event Name: WORKOVER Start: 10/10/2003 End' 10/25/2003 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 10/25/2003 Rig Name: NABORS 4ES Rig Number: 4ES i Date From-To Hours Task Code NPT Phase DescriptiOnof:Operations 10/12/2003 17:00 - 18:30 1.50 CLEAN P DECOMP handling tools for BHA & 3 1/2" DP. 18:30 - 19:00 0.50 CLEAN P DECOMP Load & tally & caliper BHA. 19:00 - 20:30 1.50 CLEAN P DECOMP M/U BHA #1 consisting of: Dressing shoe, Extension, Drive sub, X-over, 9 5/8" Casing scraper, 2 Junk baskets, Bit sub, Bumper sub, Oil jars, X-over, 3 * 6 1/4" Dcs & X-over. TL 144.94'. RIH w/same. 20:30 - 00:00 3.50 CLEAN P DECOMP P/U 3 1/2" DP, lxl & RIH. Ran 105 jts. 10/13/2003 00:00 - 03:00 3.00 CLEAN P DEOOMP Con't to P/U 3 1/2" DP lxl, & RIH. P/U total of 265 jts. TL DP + BHA = 8556'. 03:00 - 04:00 1.00 CLEAN P DECOMP Tagged up on tubing stub @ 8552'. LID single jt DP & P/U kelly. Break circulation @ 2 BPM, 200 psi. Rotate & swallow tubing stub to 8561' (9'). P/U had over pull 8K. Work up & down 3 times over stub until overpull gone. Top of stub slightly swelled? Go down over stub w/o rotating. P/U 143K, S/O 128K. Rot 136K. 50 RPMs P/U above tbg stub to reverse circulate. 04:00 - 07:00 3.00 CLEAN P DECOMP R/U & reverse circulate. Circulate @ 5 BPM, 1100 psi. Pump 20 Bbls Hi-Vis sweep. Reveresed Well clean. Recovered some Sand and Scale. 07:00 - 09:30 2.50 CLEAN P DECOMP Swallowed 5 1/2" Stump one more time with Pump off and no rotation. No problems. POOH standing back 3 1/2" Drill Pipe and 1 stand Of Drill Collars. 09:30 - 10:30 1.00 CLEAN P DECOMP Lay down BHA #1. Clean out Junk Baskets. Recovered 3 gals of Sand, Scale, and a small amount of metal shavings. 10:30 - 11:00 0.50 CLEAN P DECOMP Clear and Clean Floor. 11:00 - 14:30 3.50 FISH P DECOMP Pick-up Halco 9 5/8" RBP. RIH with 3 1/2" Drill Pipe (128 Jts) and set RBP at 4,032-ft. Pull 2 Stands. Pick-up Halco 9 5/8" RTTS Packer. RIH to 125-ft. Set Packer. 14:30 - 15:00 0.50 FISH P DECOMP Test RBP and 9 5/8" Casing. Record 3,000 psi/10 min. Good test. 15:00 - 15:30 0.50 FISH P DECOMP POOH. Lay down RTTS PKr. 15:30 - 16:30 1.00 FISH P DECOMP Continue POOH with 3 1/2" Dril Pipe. Lay down Running Tool. 16:30-18:30 2.00 FISH P DECOMP Pick-uplJtofT"Tbg. Set across BOP Stack and close Hy-Drill. Dump 2,200 lbs (44 sks) of 20/40 Sand (+/- 50'). on top of RPB. Clear & clean rig floor. 18:30 - 21:30 3.00 FISH P DECOMP P/U, tally & caliper BHA #2, casing cutting assy. Had to change out tongs on floor. 21:30 - 22:30 1.00 FISH P DECOMP RIH. Kelly up & break circulation. Kick out blades & locate collars @ 166' & 207'. P/U 20' to 187'. 22:30 - 23:00 0.50 FISH P !DECOMP Cut 9 5/8" casing @ 187'. 65 RPMs, pump 2.4 BPM (~ 550psi. P/U 24K, S/O 24K, Rot 24K. torq 70 amps. Rotate & cut for 10 : min. Lost returns out flow line. Started circulating out annulus :between conductor & 13 3/8" casing. Had only a small amount i of oil & diesel, then had warm water returns. No artic pac. S/D . pump & conductor flow stopped. Kicked in pump. Slacked off i approx 5" & tagged stub. P/U 5" & tagged casing where cut was made, giving positive indication of clean cut. 23:00 - 00:00 1.00 FISH P DECOMP 'Set back kelly. POOH & LID cutting assy. 10/14/2003 00:00 - 01:00 1.00 FISH P DECOMP M/U 9 5/8" spearing assy. BOLDS. 01:00 - 01:30 0.50 FISH P DECOMP Engage spear into 9 5/8" casing below wellhead. P/U & attempt pull casing free. Worked pipe up to 75K. Entire BOP stack, spool assys & 13 3/8" casing rose approx 3" out of conductor pipe. Appears 13 3/8 as well as 9 5/8" casings are completely parted & cut. Printed: 10/27/2003 11:33:12 AM BP EXPLORATION Page 3 of 12 Operations Surnma Report Legal Well Name: H-18 Common Well Name: H-18 Spud Date: 12/23/1982 Event Name: WORKOVER Start: 10/10/2003 End: 10/25/2003 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 10/25/2003 Rig Name: NABORS 4ES Rig Number: 4ES Date From-To Hours Task Code NPT Phase Description ofOperatons 10/14/2003 01:30 - 02:00 0.50 FISH P DECOMP LID spear assy. M/U running tool & pull pack off. Pack off came free @ 70 K. Pull to surface & inspect, Left bottom ring & seal ~n hole. LID running tool. 02:00 - 03:00 1.00 FISH P DECOMP M/U & engage spear in 9 5/8" casing. P/U & attempt to pull casing. Picked up 2.4' w/free travel & casing weight to cut ( 9k Lbs), then stopped. Appears remaining pack off ring is cocked & hanging up in spacer spool below BOP stack. Work up & down several times & hangs up in exactly the same spot. 03:00 - 03:30 0.50 FISH P DECOMP LID spear. Clear & clean rig floor. 03:30 - 06:00 2.50 BOPSUF P DECOMP N/D BOP stack & tubing spool. 06:00 - 08:00 2.00 FISH P DECOMP POOH & LID 9 5/8" casing. Recovered 165.88'. 08:00 - 09:00 1.00 FISH P DECOMP PJSM. RID 9 5/8" equipment, & P/U spear dressed for 13 3/8". 09:00 - 10:00 1.00 FISH P DECOMP Clear & clean rig floor & cellar area. 10:00 - 11:00 1.00 FISH P DECOMP PJSM on upcoming operations. Spear 13 3/8" casing, lift wellhead, hydrocarbons in area where welding to be done. 11:00 - 13:30 2.50 FISH P DECOMP Call for water & circulate down casing to diplace residual hydrocarbons. 13:30 - 15:00 1.50 FISH P DECOMP Spear 13 3/8" casing. Lift wellhead, hanger & weld studs below hanger. Remove wellhead & hanger. Pull 13 3/8" casing, recovered 13 1/2'. Pitted on outside around failed section, no :pitting on inside. 15:00 - 16:00 1.00 FISH P DECOMP ; PJSM. M/U spear dressed for 13 3/8" & engage 13 3/8" casing. I Pull 25K & hold solid, OK. Release & LID spear assembly. 16:00- 18:00 2.00 FISH P DECOMP Tally & caliper tools. P/U & M/U BHA#3 to back off15 3/8" casing. BHA is as follows: Mule shoe, XO, 10' 6 1/4" DCs, XO, Back tool assy (3 pcs), XO,XO, 2* 6 1/4" DCs & XO. TL. 411.92'. 18:00 - 19:00 1.00 FISH P DECOMP RIH w/BHA #3. Fill w/diesel. 19:00 - 20:00 1.00 FISH P I DECOMP Space out tool. Top blocks @ 52' & bottom blocks @ 82'. Calculated collar to be @ +/- 67'. Pressure & set lower blocks w/1500 psi. Increased pressure to set upper blocks & DC connection below rotary table started to leak. 20:00 - 21:00 1.00 FISH P DECOMP POOH & re-dress back off tool. 21:00 - 21:30 0.50 FISH P DECQMP RIH & fill pipe w/diesel. 21:30 - 00:00 2.50 FISH P DECOMP Pressure up & set blocks. Bleed off & slack off 20K weight. Pressure up to 5000 psi ( applies 50K torq to connection) & attempt to back off 13 3/8" casing. Con't to repeat process to back off casing, no movement noticed. 10/15/2003 00:00 - 01:00 1.00 FISH P DECOMP Con't to attempt to back off 13 3/8" casing. Pressure up to 5000 psi, then bleed off. Applying 50K fi-lbs of torq to connection. No movement noted. 01:00 - 03:00 2.00 FISH P DECOMP POOH & stand back 3 stands of DCs. LID back off tools & extra DCs. Clear rig floor. 03:00 - 04:00 1.00 FISH P DECOMP R/U scaffolding to modify drip pan to be able to get 16" pipe thru. R/U floor to handle 16" wash pipe. 04:00 - 06:00 2.00 FISH P DECOMP PJSM. R/U welding equip to cut drip pan. Cut & modify drip pan. Prep to P/U 16" wash pipe. 06:00 - 09:30 3.50 FISH P DECOMP PJSM. Pick up 17 3/8" OD shoe & washpipe assembly. Shoe would not clear rotary table, (not perfectly round). Grind off high points of shoe to accomodate rotary table ID. Tag @ 40' from top of rotary table. 09:30 - 11:30 2.00 FISH P DECOMP PJSM. Establish parameters. Up & Down wts= 22,000 lbs. Bring on charge pump, establish circulation & wash mill w/500 Printed: 1012712003 11:33:12 AM ,,, BP EXPLORATION Page 4 of 12 Operations Summary Report Legal Well Name: H-18 Common Well Name: H-18 Spud Date: 12/23/1@82 Event Name: WORKOVER Start: 10/10/2003 End: 10/25/2003 Contractor Name: NABORS ALASKA DRILLING I Rig ReLease: 10/25/2003 ,Rig Name: NABORS 4ES Rig Number: 4ES Hours Task Code NPT Phase Description of OPerations Date From-To 10/15/2003 09:30 - 11:30 2.00 FISH ~ DECOMP ft lbs torque rotating @ 40-50 RPM, 1-2K weight on mill. Wash / Mill to 63' & see torque increase, (bouncing). Believe this to be petal basket. Mill thru OK. Observe total loss of returns at this time with no resistance. Go to 67' with no resistance, bottomed out on washpipe. 11:30 - 12:30 1.00 FISH P DECOMP Dry tag without rotating @ 63', (top of collar). Bump rotate & fall over. Repeat & confirm collar @ 63'. Circulate to clean up, (no returns). 12:30 - 14:30 2.00 FISH P DECOMP POOH w/washpipe & shoe & break out / lay down same. Attempt to fill hole with fluid on vacuum truck, pumped 240 bbls, no returns. Total fluid lost to hole = 270 bbls. Fluid is static inside 13 3/8" casing stub & losses are occuring around outside of 13 3/8" casing. 14:30 - 17:00 2.50 FISH P DECOMP M/U 13 3/8" back off assembly. 17:00 - 19:30 2.50 FISH P DECOMP RIH & fill pipe w/diesel. Pressure up & set blocks. Top @ 51' Bottom @ 81'. pressure up & casing broke loose & started to turn @ 4200 psi. Recycle tool & made 2 revolutions. Blocks appear to be slipping on casing wall. 19:30 - 20:30 1.00 FISH P DECOMP POOH & redress back off tool. 20:30 - 21:30 1.00 FISH P DECOMP RIH & fill pipe w/diesel. 21:30 - 00:00 2.50 FISH P DECOMP Pressure up & set blocks. Top @ 50' bottom @ 80'. Pressure up, cycle tool & back off 13 3/8" casing. Made 5 complete revolutions. 10/16/2003 00:00 - 01:30 1.50 FISH P DECOMP POOH & LID back off tool. & excess DCs. 01:30 - 02:00 0.50 FISH P DECOMP Clear & clean rig floor. 02:00 - 02:30 0.50 FISH P DECOMP M/U BHA #6 to spear 13 3/8" casing stub. Assy consists of spear & bumper sub. 02:30 - 03:30 1.00 FISH P DECOMP Spear into 13 3/8" casing stub @ 67'. P/U w/1K tension & unscrew casing w/4 1/2" turns. POOH & recovered 23.45' of 13 3/8" casing. Casing was very corroded & had some cement remaining on pipe. Pin appeared to have no damage or visible corrosion. Threads in excellent shape, after laying down fish. a collar was screwed on w/no problem. LID spear & fish. 03:30 - 04:30 1.00 FISH P DECQMP Clear & clean rig floor. R/U tools to run 13 3/8" casing. 04:30 - 06:00 1.50 CLEAN P DECOMP Run 13 3/8" casing. Screw into existing casing stub 67'. Made 12 turns. P/U w/75K. Everything looked good. RID casing tools. Pull to 75,000 lbs, OK. Slack off & call welder & wellhead hand. 06:00 - 07:30 1.50 WHSUR P DECOMP Clear / Clean rig floor. Welder & Cameron hand take measurements & calculate cut. 07:30 - 08:00 0.50 WHSUR P DECOMP Sniff out cellar area, OK. Sniff 10' into 13 3/8" x conductor pipe annulus, 2% LEL reading. 08:00 - 08:30 0.50 WHSUR P DECOMP Conduct PJSM. Opt to pump remaining fluid from vacuum truck into 13 3/8" x conductor pipe annulus & re sniff. Discuss possible contingency plans. 08:30 - 09:00 0.50 WHSUR P DECOMP Pump 50 bbls seawater down 13 3/8" x conductor pipe annulus. Re sniff, 32% LEL reading. 09:00 - 11:00 2.00 WHSUR P DECOMP Discuss options. Make isolation plug using absorbent & duct tape & install 5' down in 13 3/8" x conductor pipe annulus. Mix heavily gelled seawater in 5 gallon bucket & dump on top of absorbent plug. Make second plug & install on top of first one, & dump 2nd 5 gallon bucket of heavily gelled solution on top of same. Sniff & read 0% LEL. Printed: 10/27/2003 11:33:12 AM BP EXPLORATION Page 5 of 12 Operations Sumrna Report Legal Well Name: H-18 Common Well Name: H-18 Spud Date: 12/23/1@82 Event Name: WORKOVER Start: 10/10/2003 End: 10/25/2003 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 10/25/2003 ~Rig Name: NABORS 4ES Rig Number: 4ES Date From -To Hours Task Code NPT Phase Description of OPerations 10/16/2003 11:00 - 17:00 6.00 WHSUR P DECOMP Modify "centralization" ring to accomodate ID of conductpor pipe. Cut (2) 2" access ports 180 degrees apart from each other in centralization ring. Sniff cellar area & 13 3/8" x conductor pipe annulus as well as inside the 13 3/8" itself. 0% LEL at all locations. Cut 13 3/8" & lay down remaining 13 3/8". Install 13 3/8" x 13 5/8" x 5M McEvoy S-3 casing head & tack same. Preheat weld area & weld. 17:00 - 00:00 7.00 WHSUR ~ DECOMP PJSM. Using Cameron Nitrogen testing unit, test casing head to 500 psi, OK. Post heat wellhead & wrap wellhead, allow to heat quench & cool. Rig has re-fabricated air boot & drip pan. Crew is cleaning & painting rig. 10/17/2003 00:00 - 07:00 7.00 WHSUR ~ DECOMP Post heated wellhead, wrap & insulate. Allow to heat quench & cool slowly, as per Cameron. Rig crew continues to clean & paint rig. 07:00 - 07:30 0.50 WHSUR ~ DECOMP PJSM. Test casing head with nitrogen to 1800 psi. No Good. Observe pinhole leak on inside of casing head. 07:30 - 09:00 1.50 WHSUR ~ DECOMP GBR welder out. PJSM. Sniff area, 0% LEL. Grind, pre heat & weld circumference of area inside casing ead where pinhole leak was detected. 09:00 ~ 10:00 1.00 WHSUR ~ DECOMP PJSM. Pressure test casing head wi nitrogen to 1800 psi, OK. Bleed off pressure & disassemble scaffolding. 10:00 - 14:00 4.00 BOPSUF ~ DECOMP PJSM. Nipple up 13 5/8" x 5M BOPE. 14:00- 18:00 4.00 BOPSUF.P DECOMP PJSM. Conduct full test on BOPE. Test witnessed by AOGCC State Rep John Crisp. Drain stack & pull test plug. Clear & clean rig floor. 18:00 - 21:00 3.00 FISH P DECOMP !Hold PJSM. P/U tally & caliper BHA # 7, consisting of mule shoe, x/o, (10) drill collars, x/o, back off assembly, (2) x/o, (3) drill collars, x/o, & back to drill pipe. Overall length of BHA - 443.65'. 21:00 - 00:00 3.00 FISH P DECOMP Fill pipe w/diesel. Space out back off tool to cover 197' to 227'. Calculate collar to be @ 207'. Pressure up & set upper & lower blocks. Attempt to back off cut casing jt w/50,000 ft/Ibs of torque, (5000 psi on back off tool), Recycle tool & continue to attempt to break out connection w/no results. Attempted 12 times total. 10/18/2003 00:00 - 02:00 2.00, FISH P DECOMP POOH & LID back off tools. LID excess DCs. 02:00 - 03:00 1.00 FISH P DECOMP Clear & clean rig floor. Caliper new BHA. 03:00 - 04:30 1.50 FISH P DECOMP P/U & M/U BHA #8 consisting of 11 3/4" washpipe. Assembly is as follows: 12 1/4" shoe, 3jts 11 3/4" washpipe, drive sub, oil iars, XO, 1'6 1/4" DC, XO. TL = 137.18'. RIH w/BHA. ~04:30 - 06:00 1.50 FISH P DECOMP P/U kelly & RIH. Rotate over top of cut off jt @ 187'. Con't to run in hole to 206'. Started to take weight. P/U & break circulation. Begin washing. Wash to 204'. 06:00 - 07:30 1.50 FISH P DECOMP PJSM. Continue to wsh/ream over 9 5/8" casing. 26K up & down wts. Rotating @ 45 RPM, 1-2K WOM. 500-700 ft lbs maximum torque achieved. See indication of collar @ 206' & wash / ream with little resistance to next collar @ 245'. Rotate past OK & wash down to 265'. See sandy returns. Set back kelly. 07:30 - 09:30 2.00 FISH P DECOMP POOH & LID washpipe & shoe. 09:30 - 11:30 2.00 FISH P DECOMP PJSM. Make up 9 5/8" back off assembly & RIH. 11:30 - 14:00 2.50 FISH P DECOMP Fill drill pipe with diesel. Position lower anchor @ 227', upper anchor @ 197'. Pressure up drill pipe to 1500 psi to set lower Printed: 10/27/2003 11:33:12 AM BP EXPLORATION Page 6 of 12 Operations Summary Report Legal Well Name: H-18 Common Well Name: H-18 Spud Date: 12/23/1982 Event Name: WORKOVER Start: 10/10/2003 End: 10/25/2003 ,Contractor Name: NABORS ALASKA DRILLING I Rig Release: 10/25/2003 Rig Name: NABORS 4ES Rig Number: 4ES Date From -To Hours Task Code NPT' Phase Description of Operations 10/18/2003 11:30 - 14:00 2.50 FISH P DECOMP anchor, did not get good indication of anchor setting, pressure up to 1800 psi & get good indication of anchor setting. Hold for 5 minutes & bleed off. Slack off 20,000 lbs on lower anchor. Pressure up drll pipe to 5000 psi to set upper anchor & hold for 5 minutes. Bleed off & attempt to break 9 5/8" connection with up to 5500 psi "- 55,000 fi/lbs torque. Repeat process (6) more times with no success. Opt to Unseat tool, POOH & repin & attempt to break connection @ 245'. 14:00 - 18:00 4.00 FISH N DFAL DECOMP PJSM. POOH to upper anchor. Anchor blocks not fully retracted. Attempt to repair / rebuild in pipeshed, proper tools unavailable, send to Baker Machine. Repair tool & bring back to rig. Re-assemble back off tool. 18:00 - 19:00 1.00 FISH P DECOMP RIH & fill pipe w/diesel. 19:00 - 21:00 2.00 FISH P DECOMP Space out back off tool. Presure up & set blocks @ 230' & 260'. Estimate collar @ 247'. Presure up & attempt to back off 9 5/8" casing. Con't to recycle tool & back off 10 times w/o result. 21:00 - 23:00 2.00 FISH P DECOMP POOH & LID Back off tool. 23:00 - 23:30 0.50 FISH P DECOMP Clear & clean rig floor. Load 5" DP in pipe shed & tally same. 23:30 - 00:00 0.50 FISH P DECOMP M/U BHA # 10.8 1/4" Spear, spear extension, stop ring, stop sub, bumper jar. TL = 18.07' 10/19/2003 00:00 - 02:00 2.00 FISH P DECOMP Finish M/U BHA # 10, Spear assy. RIH on 6 jts of 5" DP & engauge casing @ 187'. P/U w/10K tension & insure set. Hold tension on spear. 02:00 - 03:00 1.00 FISH P DECOMP Hold PJSM. R/U Schlumberger & wireline equip. 03:00 - 03:30 0.50 FISH DECOMP RIH w/240 Gram string shot (3 wraps) to 204'. Put 15,000 fi/lbs left hand torque in 5" DP. Fire string shot. Lost 1/8 turn of torque after firing. 03:30 - 06:00 2.50 FISH N DFAL DECOMP POOH & P/U 320 gram charge (4 wraps) & RIH. (W/L crew change out) Attempt to put on depth, CCL not working. POOH to change out CCL. 06:00 - 07:30 1.50 FISH P DECOMP PJSM. RIH w/6' of 320 gram, (4) strands, stringshot & CCL. Position center of string shot @ 204'. Apply 15,000 fi/lbs of left hand torque @ surface, close annular preventer with kill line open to pits & fire string shot. See approximately 1/4 turn on pipe, indicating connection broke. POOH w/& rig down E line. 07:30 - 09:00 1.50 FISH P DECOMP PJSM. Slack off pipe to neutral weight & attempt to back off 9 5/8" casing connection @ 204' by applying left hand torque with rig tongs. See break @ 16,000 ft/Ibs of torque. Weakest connection made up w/23,000 fi/lbs of torque. Able to turn by hand after breaking & making (2) rounds. Suspect tool joint in string broke. Make up & release spear...some trouble releasing spear. 09:00 - 12:00 3.00 FISH P DECOMP POOH w/spearing assembly & pick up 9 5/8" back off assembly as run on previous runs. 12:00 - 14:00 2.00 FISH P DECOMP PJSM. Fill pipe with diesel. Position Baker Back Off Tool with lower anchor @ 225', upper anchor @ 195'. Pressure up Drill Pipe to 1500 psi & set lower anchor. Bleed pressure & slack off 20,000 lbs on anchor. Pressure up to 5000 psi & set upper anchor. Slack off remaining weight. Bleed off pressure. . Pressure up & observe break & 1/5th turn to the left with 2500 : psi or 25,000 ft lbs of torque. Bleed & re pressure, see left !hand turn w/1500 psi. Continue in this manner with pressure Printed: 10/27/2003 11: 33:12 AM BP EXPLORATION Page 7 of 12 Operations Summa Report Legal Well Name: H-18 Common Well Name: H-18 Spud Date: 12/23/1982 Event Name: WORKOVER Start: 10/10/2003 End: 10/25/2003 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 10/25/2003 Rig Name: NABORS 4ES Rig Number: 4ES Date From-To Hours Task Code NPT Phase: : Description of OPerations .......... lO/19/20o3 12:0o - 14:oo 2.00 FISH P DECOMP required continuously dropping. Achieve 6 1/4 total left hand turns. 14:00 - 17:15 3.25 FISH P DECOMP POOH with and lay down Baker Back OffTool. Pick up spear assembly. ~17:15-18:00 0.75 FISH P DECOMP RIH w/ spear assembly. 18:00 - 19:30 1.50 FISH P DECOMP Engage stump w/spear. P/U 5K over & put in 4 turns of lefthand rotation. Casing stub came free. POOH & LID spear assy & cut offjt of 9 5/8". TL offish 19.19'. Pin end looks good & inspected @ Baker Machine, OK. ID @ pin 8.875". 19:30 - 20:30 1.00 FISH P DECOMP Clear & clean rig floor. 20:30-21:00 0.50 FISH P DECOMP RIH w/ muleshoe on 31/2" DP to 285'. 21:00 - 23:00 2.00 FISH N SFAL DECOMP R/U hot oilers & pressure test lines to 3000 psi. Attempt to pump diesel, PTO not working. Call for another truck. 23:00 - 23:30 0.50 FISH N DECOMP R/U 2nd hotoil truck, test lines to 3000 psi. Pump 30 Bbls diesel & freeze protect 13 3/8" x 9 5/8" annulus. 3 BPM @ 450 psi. 23:30 - 00:00 0.50 FISH N DECOMP POOH & standback 3 1/2" DP. Break off muleshoe. 10/20/2003 00:00 - 01:00 1.00 FISH P DECOMP R/U casing tools to run 9 5/8" casing tieback. 01:00 - 03:30 2.50 FISH P DECOMP M/U Baker cut lip guide sub & screw-in sub. RIH on 5 jts 9 5/8" L-80, 47#, BTC casing TL 208.08'. P/U 20' pup & screw into existing casing @ 206'. M/U to 12,000 ft/Ibs torque. ( avg previous 5 jts). Work up & down to ensure torque on connection. P/U 45K & check. LID 20' pup. Collar connection 3' above floor. 03:30 - 05:00 1.50 FISH P DECOMP R/U, fill casing & pressure test 9 5/8" tieback. Pressure up 3500 psi & hold for 60 min. Chart same. Tested good. Bled off pressure & RID test lines. 05:00 - 08:00 3.00 BOPSUR P DECOMP Drain stack, pump out diesel in 9 5/8" casing. N/D BOP. 08:00 - 08:30 0.50 BOPSUR P DECOMP PJSM with all personal. Emphasis on commuication, awareness, staying clear of areas where lift is taking place. Discussed upcoming oeration in detail & addressed any concerns. 08:30 - 09:30 1.00 WHSUR P DECOMP Lift BOP stack. Pul 230,000 lbs on 9 5/8" casing, (14 1/2" stretch). Set slips & slack off, OK. 09:30 - 12:00 2.50 WHSUR P DECOMP PJSM. Make initial cut on 9 5/8" casing. Move BOP stack out of the way. Dress off cut on casing stub. 12:00 - 13:30 1.50 WHSUR P DECOMP Install tubing spool & pack off. Test to 3500 psi, OK. 13:30 - 15:30 2.00 BOPSUR P DECOMP Install 2 nd annular valve on wellhead. N/U BOPE. 15:30 - 16:30 1.00 BOPSUR P DECOMP Install test plug. Pressure test full BOP body, LP 250 psi, HP 3500 psi, OK. 16:30 - 17:00 0.50 WHSUR P DECOMP Pull test plug. Install wear bushing. RID test equip. 17:00 - 18:00 1.00 FISH P DECOMP P/U, M/U & caliper BHA # 12. as follows: Reverse circ shoe, Reverse circ basket, Top sub, 2 junk baskets, bit sub, bumper jars, oil jars, XO, 9 *6 1/4" DCs, XO. TL- 318.65'. 18:00 - 19:00 1.00 FISH P DECOMP RIH w/3 1/2" DP to 285'. 19:00 - 19:30 0.50 FISH P DECOMP M/U head pin on 3 1/2" DP. Break circulation & circulate out diesel from inside 9 5/8" casing. 3 BPM @ 200 psi. 19:30-20:00 0.50 FISH P DECOMP Con't to RIH w/ BHA #12 to 2000'. 20:00 - 21:00 1.00 FISH P DECOMP Cut & slip 84' of drilling line. 21:00-22:00 1.00 FISH P DECOMP Con'ttoRIHw/BHA#12. Tag up on fill @ 3972'. Printed: 10/27/2003 11:33:12 AM BP EXPLORATION Page 8 of 12 Operations Summary Report Legal Well Name: H-18 Common Well Name: H-18 Spud Date: 12/23/1982 Event Name: WORKOVER Start: 10/10/2003 End: 10/25/2003 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 10/25/2003 Rig Name: NABQRS 4ES Rig Number: 4ES Date From -To Hours Task Code NPT Phase Description of Operations 10/20/2003 22:00 - 22:30 0.50 FISH P DECOMP P/U kelly. Dry core drill from 3972 to 3974'. Drop ball. Break circulation 2.5 BPM, 600 psi. Pressureincreased to 1100 psi when ball hit. Reverse circulate from 3974 to 3976', Basket full. 40 RPMs, 150 Amps, P/U 87k, SIC 83K, Rot 85K. 22:30 - 00:00 1.50 FISH P DECOMP Set back kelly & POOH wi drill string. 10/21/2003 00:00 - 01:00 1.00 CLEAN P DECOMP Broke Out, L / D and Cleaned Out Reverse Circulating Junk Basket. Recovered 1 Piece of Metal. 1 Large Rock, 3" x 4", Several Smaller Rocks Apx 1" x 2". String Junk Baskets Contained Sand and Gravel, Apx 30#. 01:00-01:30 0.50 CLEAN ~ DECOMP HeldPJSM. M/UCleanOutBHA#12;ReverseCircShoe- Reverse Circ Junk Basket - Top Sub - 2 x Junk Baskets - Bit Sub - Bumper Sub - Oil Jars - XO - 9 x 6-1/4" DC - XO. BHA Total Length 318.65'. 01:30 - 02:30 1.00 CLEAN ~ DECOMP RIH w/Clean Out BHA on 3-1/2" DP. Tagged Fill at 3,974'. 02:30 - 03:00 0.50 CLEAN ~ DECOMP Dropped Ball, M / U Kelly. Established Parameters, String Weight Up 87,000#, String Weight Down 83,000#, String Weight Rotating 85,000#, RPM 40. Reverse Circulated Over Fill. Pump Rate 4 bpm, 700 psi. Ball Hit on Seat Pressure Increased to 1,600 psi. Washed and Reamed from 3,974' to 3,979'. 03:00 - 04:30 1.50 CLEAN ~ DECOMP Blew Down and Stood Back Kelly. POOH w/3-1/2" DP. 04:30 - 06:00 1.50 CLEAN P DECOMP Broke Out, L / D and Cleaned Out Reverse Circulating Basket. Recovered Large Rocks and Cobbles. 2" x 3", most 1-1/2" x 2". Cleaned Out String Junk Baskets, Recovered Sand, Gravel and Scale. 06:00 - 07:00 1.00 CLEAN P DECOMP Held PJSM. M / U Clean Out BHA; Reverse Circ Shoe - Reverse Circ Junk Basket - Top Sub - 2 x Junk Baskets - Bit Sub - Bumper Sub - Oil Jars - XO - 9 x 6-1/4" DC - XO. BHA Total Length 318.65'. .07:00 - 08:00 1.00 CLEAN P DECOMP RIH w/Clean Out BHA on 3-1/2" DP. Tagged Fill at 3,974'. 08:00 - 09:00 1.00 CLEAN P DECOMP M / U Kelly. Established Parameters, String Weight Up 87,000#, String Weight Down 83,000#, String Weight Rotating 85,000#, RPM 30. Tagged Up at 3,974', Rotated Down, RPM 30, Stacked Out 5,000# on Fill at 3,983'. Dropped Ball and Reverse Circulated, Pump Rate 4 bpm, 1,800 psi. Filled Reverse Circulating Basket. 09:00 - 10:30 1.50 CLEAN P DECOMP Blew Down and Stood Back Kelly. POOH w/3-1/2" DP. 10:30 - 11:30 1.00 CLEAN P DECOMP Broke Out, L / D and Cleaned Out Reverse Circulating Basket and String Junk Baskets. Recovered Apx 2-1/2 Gallons of Sand and Small Gravel, No Large Rocks. 11:30 - 12:30 1.00 CLEAN P DECOMP Held PJSM. M / U Retrieving BHA: Halliburton O/S Retrieving Tool - XO - 2 x Junk Baskets - Bit Sub - XO - 9 x 6-1/4" DC - XO. BHA Total Length 296.86'. 12:30 - 14:00 1.50 CLEAN P DECOMP RIH w/Retrieving Tool BHA on 3-1/2" DP to 3,980'. 14:00 - 18:30 4.50 CLEAN N DPRB DECOMP Held PJSM. M / U Circulating Head and Line. RIH and Tagged Up at 3,980'. Reverse Circulated, Pump Rate 4 bpm, 600 psi. Washed Down from 3,980' to 3,985'. Reverse Circulated 3 DP Volumes. Made Connection and Circulated the Long Way, Pumped 40 bbl Hi-Vis Sweep, Pump Rate 5 bpm, 750 psi. Washed Down from 3,985' to 3,995'. Circulated Wellbore for 15 Minutes, Pump Rate 5 bpm. Lined Up and Reverse Circulated, Pump Rate 5 bpm, 750 psi. Washed Down from 3,995', Observed Pressure Increase Indicating Drill String Plugging. Printed: 10/27/2003 11:33:12 AM BP EXPLORATION Page 9 of 12 Operations Summa Report Legal Well Name: H-18 Common Well Name: H-18 Spud Date: 12/23/1982 Event Name: WORKOVER Start: 10/10/2003 End: 10/25/2003 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 10/25/2003 Rig Name: NABORS 4ES Rig Number: 4ES Date From -To: Hours Task Code NPT Phase Description of Operations 10/21/2003 14:00 - 18:30 4.50 CLEAN N DPRB DECOMP Shut Down Pump and Picked Up on Drill String. Lined Up and Pumped Down Drill String and Cleared Plug. Attempted to Reverse Circulate and Encountered Same Plugging Action. Lined Up and Pumped Down Drill String, Pump Rate 5 bpm, 750 psi. After Pumping 25 bbls, Drill String Plugged Off Completely. Attempted to Clear Drill String with No Success. Lined Up to Reverse Circulate, Pump Rate 5 bpm, 750 psi with No Restrictions. Depth of Overshot 3,975', 20' Above Fill. Reverse Circulated 1 Hole Volume. Observed Pressure Build to 2,000 psi, 4 bpm. Shut Down Pump and Closed Surface Safety Valve. Inspected and Cleaned Out Connections Above Circulating Head, Swivels and 1502 Unions, Recovered Approximately 2-1/2 Gallons of Sand and Gravel to 1-1/2" Diameter. 18:30 - 19:30 1.00 CLEAN N DPRB DECOMP M / U Circulating Head and Line. Attempted to Reverse Circulate, Drill String Plugged Off. Made Several Attempts to Clear Drill String with No Success. 19:30 - 22:00 2.50 CLEAN P DECOMP Blew Down and R / D Lines. POOH w/3-1/2" DP. Entire Drill String Pulled Wet. 22:00 - 22:30 0.50 CLEAN P DECOMP Broke Out and L / D BHA. O / S, 2 - Junk Baskets, XO's to First DC, 16', Plugged w/Sand and Some Small Gravel. Cleaned Out ID of Tools. Cleaned Rig Floor. 22:30 - 23:30 1.00 CLEAN P DECOMP Held PJSM. M / U Clean Out / Bit BHA; 8-1/2" Bit - 2 x Junk Baskets - Bit Sub - Bumper Sub - Oil Jars - XO - 9 x 6-1/4" DC -XO. BHA Total Length: 314.20'. 23:30 - 00:00 0.50 CLEAN P DECOMP RIH w/BHA on 3-1/2" DP. 10/22/2003 00:00 - 01:00 1.00 CLEAN P DECOMP RIH w/BHA on 3-1/2" DP to 3,968'. 01:00 - 01:30 0.50 CLEAN P DF:COMP Held PJSM. M / U Kelly, Established Parameters, String Weight Up 88,000#, String Weight Down 82,000#, String Weight Rotating 85,000#, RPM 75, Torque 2,500 ft / lbs. RIH without Rotation, Tagged Up at 3,994'. P / U on Drill String, Reamed Down without Pumps from 3,994' to 3,998'. Maximum Set Down Weight 5,000#. P / U on Drill String, Observed 10,000# Overpull from 3,998' to 3,994'. 01:30 - 03:00 1.50 CLEAN P DECOMP Pumped and Circulated Around 40 bbl Hi-Vis Sweep. Pump Rate 6 bpm, 650 psi. Rotated and Reciprocated Drill String While Circulating. RPM 80, 4 spm. Washed Down to 3,998'. Circulated Back Fine Sand with Sweep, No Gravel or Rocks. Circulated Until Returns Over Shaker were Clean. 03:00 - 04:00 1.00 CLEAN P DECOMP Washed and Reamed from 3,998' to 4~003'. Pumped and Circulated Around 40 bbl Hi-Vis Sweep. Pump Rate 6 bpm, 650 psi. Rotated and Reciprocated Drill String While Circulating. RPM 80, 4 spm. Circulated Back Fine Sand with Sweep, No Gravel or Rocks. Circulated Until Returns Over Shaker were Clean. 04:00 - 06:00 2.00 CLEAN P DECOMP Washed and Reamed from 4,003' to 4,013'. Pumped and Circulated Around 40 bbl Hi-Vis Sweep. Pump Rate 6 bpm, 600 psi. Rotated and Reciprocated Drill String While Circulating. RPM 80, 4 spm. Circulated Back Fine Sand with Sweep, No Gravel or Rocks. Circulated Until Returns Over Shaker were Clean. Printed: 10/27/2003 11:33:12 AM ( BP EXPLORATION Page 10 of 12 Operations Summary Report Legal Well Name: H-18 Common Well Name: H-18 Spud Date: 12/23/1982 Event Name: WORKOVER Start: 10/10/2003 End: 10/25/2003 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 10/25/2003 Rig Name: NABORS 4ES Rig Number: 4ES Date From -To Hours Task Code NPT Phase DesCription of Operations 10/22/2003 06:00 - 08:30 2.50 CLEAN P DECOMP POOH w/3-1/2" DP. 08:30 - 09:30 1.00 CLEAN P DECOMP Broke Out and L / D BHA. Recovered Small Amount of Rocks in Junk Baskets. 09:30 - 10:30 1.00 CLEAN P DFCOMP Held PJSM. M / U Reverse Circulating BHA; Reverse Circ Shoe - Reverse Circ Junk Basket - Top Sub - 2 x Junk Baskets - Bit Sub - Bumper Sub - Oil Jars - XO - 9 x 6-1/4" DC - XO. BHA Total Length 318.65'. 10:30 - 12:00 1.50 CLEAN P DECOMP RIH w/Reverse Circulating BHA on 3-1/2" DP to 4,004'. 12:00 - 13:00 1.00 CLEAN P DECOMP Dropped 5/16" Ball, M / U Kelly, Established Parameters: String Weight Up 90,000#, String Weight Down 84,000#, String Weight Rotating 87,000#. Tagged Fill w/Pump Off at 4,003', Picked Up 10' and Engaged Pump, Pump Rate 5 bpm, 850 psi. Pumped 1 DP Volume of 25 bbls, Washed and Rotated Down, RPM 45, to 4,019'. Picked Up on Drill String and Shut Down Pump. Worked Drill String Up and Down Several Times. Rotated Drill String and Dry Drilled Reverse Circulating Basket to 4,021'. 13:00 - 14:30 1.50 CLEAN ~ DECOMP POOH w/3 1/2" DP. 14:30 - 16:00 1.50 CLEAN ~ DECOMP Broke Out, L / D BHA and Cleaned Out Reverse Circulating Basket and Junk Baskets. Recovered 1 Piece of Rubber and Apx 3 Gallons of Sand. 16:00 - 16:30 0.50 CLEAN ~ DECOMP Held PJSM. M / U Halliburton RBP Retrieving Tool. 16:30 - 18:30 2.00 CLEAN ~ DECOMP RIH w/Retrieving Tool on 3-1/2" DP to 4,010'. 18:30 - 20:00 1.50 CLEAN ~ DECOMP Held PJSM. M / U Circulating Head and Lines. Established Parameters: String Weight Up 83,000#, String Weight Down 76,000#. Tagged Up on Fill at 4,012'. Closed Annular and Reverse Circulated to Clean Sand Off of RBP. Pump Rate 5 bpm, 600 psi. RIH and Cleaned Out to 4,030'. Circulated Until Returns Over Shaker were Clean. 20:00 - 20:30 0.50 FISH P DECOMP Latched and Released RBP at 4,030'. 20:30 - 21:30 1.00 CLEAN P DECOMP Circulated Bottoms Up. Pump Rate 5 bpm, 600 psi. 21:30 - 23:30 2.00 CLEAN P DECOMP POH w/3 1/2" Drill Pipe 23:30 - 00:00 0.50 CLEAN P DECOMP Break Out and Lay down 9 5/8" Retrievable Bridge Plug 10/23/2003 00:00 - 00:30 0.50 CLEAN 'P DECOMP Cleared and Cleaned Rig Floor 00:30 - 02:00 1.50 CLEAN P DECOMP Held PJSM, M/U Clean Out BHA; Dress Shoe - Drive sub - Shear Pin Assy - 1 Jt 2 7/8 Pac DP - Mule Shoe - Double Pin Sub - XO - XO - Bumper Sub - Oil Jars - XO - XO. Total BHA Length = 69.73' 02:00 - 05:00 3.00 CLEAN P DECOMP RIH w/BHA on 3 1/2" DP to 8,543'. 05:00 - 08:00 3.00 CLEAN P DECOMP R / U Circulating Head and Line. Established Parameters: String Weight Up 136,000#, String Weight Down 117,000#. Closed Annular and Engaged Pump, Pump Rate 4 bpm, 800 psi. RIH and Reverse Circulated to Clean Sluggits Off of IBP at 8,586'. Cleaned Out to 8,572'. Bled O/A from 950 psi to 0 psi. Reverse Circulated Until Returns Over Shaker Were Olean. Pump Rate 4 / 5 bpm, 1,100 psi to 2,200 psi. Observed Sand, Sluggits, Rubber, Paper and Small Metal Over Shaker. 08:00- 13:30 5.50 CLEAN P DECOMP Held PJSM. POOH L / D 3-1/2" DP. 13:30 - 15:00 1.50 CLEAN P DECOMP Broke Out and L / D BHA. 15:00 - 15:30 0.50 WHSUR P DECOMP M / U Retrieving Tool, Latched and Pulled Wear Bushing. 15:30 - 17:00 1.50 RUNCOItl~ COMP Cleared and Cleaned Rig Floor. 17:00 - 19:00 2.00 RUNCOItl~ COMP R / D 3-1/2" DP Handling Equipment, R / U 5-1/2" 13Cr Tubing Handling Equipment. Printed: 10/27/2003 11:33:12 AM BP EXPLORATION Page 11 of 12 Operations Surnrna Report Legal Well Name: H-18 Common Well Name: H-18 Spud Date: 12/23/1@82 Event Name: WORKOVER Start: 10/10/2003 End: 10/25/2003 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 10/25/2003 Rig Name: NABORS 4ES Rig Number: 4ES Date From-To Hours Task Code NPT Phase DescriPtionof:Operations -- 10/23/2003 19:00 - 19:30 0.50 RUNCOI~ COMP Held PJSM w/Drilling Crew, Casing Hand, Baker Rep, Tour Pusher and Drilling Supervisor. 19:30 - 20:30 1.00 RUNCO~ COMP M / U 5-1/2" Tail Pipe:5-1/2" Unique Overshot Assembly - X Nipple Assembly w/RHC-M Sleeve - 9-5/8" x 5-1/2" Baker S-3 Packer Assembly - Upper X Nipple Assembly. Torque Turned Connections, M / U Torque 5,960 ft / lbs. BAKERLOK'D All Connections Below Packer. 20:30 - 00:00 3.50 RUNCOr IP COMP M / U and RIH w/5-1/2" 17# 13Cr80 Tubing. P / U Tubing w/ Compensator and Torque Turned All Connections, M / U Torque: Vam ACE Threads 5,060 ft / lbs, FOX Threads 6,250 ft / lbs. 10/24/2003 00:00 - 13:00 13.00 RUNCOI~iTM COMP M / U and RIH w/5-1/2" 17# 13Cr80 Tubing. P / U Tubing w/ Compensator and Torque Turned All Connections. 28 Joints Vam ACE Threads M / U Torque 5,060 ft / lbs; 35 Joints FOX Threads M / U Torque 6,250 ft / lbs; 45 Joints New Vam Threads M / U Torque 5,500 ft / lbs; 104 Joints Vam TOP Threads M / U Torque 5,400 ft / lbs. Total Run 212 Joints. 13:00 - 14:30 1.50 RUNCOI~TM COMP Held PJSM. Established Parameters: String Weight Up 147,000#, String Weight Down 127,000#. R / D Compensator, M / U Circulating Head Jt #220 w/8' Pup Joint, M / U Line and Engaged Pump. Pump Rate 2.5 bpm, 125 psi. Washed Down Over Tubing Stub, Observed Pressure Increase to 450 psi as Overshot Swallowed Tubing Stub 43' in, Shut Down Pump, Pressure Remained at 450 psi. Bled Down Pressure. 14:30-15:30 1.00 RUNCOI~' COMP .Broke Outand L / D Jt #220 and #219. M / U Pup Joints to Space Out 4' Above No-Go Depth on Top of Tubing Stub. M / U Jt #219. 15:30 - 16:00 0.50 RUNCOI~rlP COMP Held PJSM. M / U Tubing Hanger, XO and Landing Jt. M / U Circulating Head and Line. 16:00 - 17:00 1.00 RUNCOI~ COMP R / D 5-1/2" Tubing Handling Equipment. 17:00 - 21:30 4.50 RUNCOI~ COMP Held PJSM. Reverse Circulated 200 bbls 140 deg Seawater, Pump Rate 3 bpm, 150 psi, Followed by 400 bbls 140 deg Seawater w/Corrosion Inhibitor, Pump Rate 3 bpm, 150 psi. 21:30 - 22:00 0.50 RUNCOI~rlP COMP Drained BOP Stack, RIH and Landed Tubing Hanger. RILDS Completion Equipment Set At The Following Depths: Item Length Depth Overshot Assembly 18.73' 8,562.20' X Nipple Assembly w/RHC Sleeve 20.41' 8,523.06' 9-5/8"x 5-1/2" S-3 Packer Assembly 23.03' 8,500.03' X Nipple Assembly 19.80' 8,480.23' 1Jr 5-1/2" 17# 13CrVam ACE Tbg 39.64' 8,440.59' #1 GLM Assembly 27.39' 8,413.20' 22 Jts 5-1/2" 17# 13Cr Vam ACE Tbg 851.05' 7,562.15' #2 GLM Assembly 26.96' 7,535.19' 5 Jts 5-1/2" 17# 13Cr Vam ACE Tbg 197.56' 7,337.63' 5-1/2" Vam ACE x 5-1/2" FOX XO 2.80' 7,334.83' 35 Jts 5-1/2" 17# 13Cr FOX Tbg 1,497.99' 5,836.84' #3 GLM Assembly 27.40' 5,809.44' 45 Jts 5-1/2" 17# 13Cr New Vam Tbg 1,439.58' 4,369.86' 5-1/2" New Vam x 5-1/2" Vam TOP XO 2.89' 4,366.97' 27 Jts 5-1/2" 17# 13Cr Vam TOP Tbg 1,097.78' 3,269.19' #4 GLM Assembly w/Shear Valve 28.76' 3,240.43' 28 Jts 5-1/2" 17# 13Cr Vam TOP Tbg 1,153.61' 2,086.82' Printed: 10/27/2003 11:33:12 AM BP EXPLORATION Page 12 of 12 Operations Summary Report Legal Well Name: H-18 Common Well Name: H-18 Spud Date: 12/23/1982 'Event Name: WORKOVER Start: 10/10/2003 End: 10/25/2003 Contractor Name: NABORS ALASKA DRILLING I Rig Release: 10/25/2003 Rig Name: NABORS 4ES Rig Number: 4ES Date From-To Hours Task Code NPT Phase Description of Operations 10/24/2003 21:30 - 22:00 0.50 RUNCO~ P COMP X Nipple Assembly 20.42' 2,066.40' 48 Jts 5-1/2" 17# 13Cr Vam TOP Tbg 1,986.01' 80.39' 2 - 5-1/2" 17# 13Cr Vam TOP Pup Jts 13.70' 66.69' 1 Jt 5-1/2" 17# 13Cr Vam TOP Tbg 41.62' 25.07' Tubing Hanger 5.92' 19.15' 22:00 - 00:00 2.00 RUNCOr~F~ COMP Held PJSM. Dropped Ball/Rod Assembly and Allowed to Fall On Seat in RHC Sleeve at 8,532'. R / U and Tested Lines to 3,500 psi, OK. Pressured Up on Tubing To 2,500 psi To Set Packer, Continued To Pressure Up on Tubing To 3,500 psi. Lost 600 psi in 20 Minutes. Bled Down Pressure to 0 psi. Repressured Tubing to 3,500 psi, Lost 400 psi in 12 Minutes. Pressured up and Tested 9-5/8" x 5-1/2" Annulus to 3,500 psi, Tubing Pressure Climbed w/IA Pressure to 3,500 psi. All Pressures Held f/30 Minutes. Bled Down Tubing Pressure and Observed DCK Valve Shear. Bled Down All Pressures. Pumped Down Both Annulus and Tubing to Ensure DCK Valve Fully Sheared, Good Communication Through Both IA and Tubing. Pump Rate 4 bpm, 500 psi. 10/25/2003 00:00 - 01:00 1.00 WHSUR P COMP Broke Out and L / D Landing Joint and XO. Set TWC and Tested to 1,000 psi. Blew Down Lines and Drained BOP Stack. 01:00 - 03:00 2.00 BOPSUF. P COMP Held PJSM. Removed Variable Rams from BOP Stack. Dismantled BOP Catwalk, Removed Kill Line and Choke Line Valves. 03:00 - 09:00 6.00 BOPSUFiP COMP N / D BOPE. Broke BOP Stack Down into Individual Components. 09:00 - 11:30 2.50 WHSUR P COMP Held PJSM. N / U Adapter Flange and Production Tree. Tested Hanger, Neck Seal and Void to 5,000 psi, OK. Tested Tree to 5,000 psi, OK. 11:30 - 12:00 0.50 WHSUR P COMP Held PJSM. R / U DSM Lubricator, Pulled TWC, R / D DSM. 12:00 - 15:00 3.00 WHSUR P COMP Held PJSM. R / U Little Red Hot Oil, Pressure Tested Lines to 2,500 psi, OK. Pumped 145 bbls of Diesel Freeze Protect Down Annulus. Pump Rate 2.5 bpm, 1,380 psi Opened Tree Valves and U-Tubed Diesel Freeze Protect. Rigged Up on 13-3/8" x 9-5/8" OA. Pressure Tested OA. Staged Up Pressure to 2,000 psi. Pumped 2 bbls to Achieve 2,000 psi. Lost 50 psi in First 15 Minutes, Lost 40 psi in Second 15 Minutes. Bled Down All Pressures, Blew Down Lines, R / D Little Red Hot Oil. 15:00 - 16:00 1.00 WHSUR P COMP Removed Secondary Annulus Valve. Set BPV. Installed Blind Flange on Tree. Secured Well. Released Rig at 1600 hrs, 10 / 25 / 2003. Printed: 10/27/2003 11:33:12 AM STATE OF ALASKA ALASF.-~-~..IL AND GAS CONSERVATION COMMISSIC'-" REPORT G. SUNDRY WELL OPEhATIONS 1. Operations performed: Operation shutdown Stimulate__ Plugging__ Pull tubing Alter casing Repair well 2. Name of Operator BP Exploration (Alaska) inc. 3. Address P. 0. Box 196612, Anchoracle, Alaska 99519-6612 5. Type of Well: Development Exploratory Stratigraphic Service Perforate x Other__ 6. Datum elevation (DF or KB) KBE=80.35 7. Unit or Property name Prudhoe Bay Unit feet 4. Location of well at surface 700' SNL, 1735' WEL, Sec. 21, T11N, R13E, UPM At top of productive interval 456' NSL, 321'EWL, Sec. 15, T11N, R13E, UPM At effective depth 4834'NSL, 4681' EWL, Sec. 15, T11N, R13E, UPM At total depth 445' NSL, 614' EWL, Sec. 15, T11N, R13E, UPM 12. Present well condition summary Total depth: Effective depth: measured true vertical measured 9810' feet Plugs (measured) true vertical 9268' feet 9765' feet Junk (measured) 9226' feet 8. Well number H- 18(14-15-11-13) 9. Permit number/approval number 82-210 / 10. APl number 50-029-20880 11. Field/Pool I Prudhoe Oil Pool Casing Length Size Cemented Structural -- Conductor 110' ~.O"x 30" 8 cu. yds. Concrete Surface 2460' 13 3/8" 3572 c.f. Permafrost II Intermediate 8929' 9 5/8" 1193 c.f. Class G; Production -- 67 c.f. Permafrost II Liner 1123' 7" ~90 c.f. Class G w/18% salt Perforation depth: measured 9392'-9467', 9496'-9540' Sqzed 9480'-9496' Measured depth 145 2495 8964 8687-9810 True vertical depth BKB 145 2530 8434 8176-9223 true vertica§ubsea8801'-8870', 8897'-8938' Sqzed 8882'-8897' Tubing (size, grade, and measured depthy'Y5 1/2" to 8592' w/4 1/2 tailpipe 8762 Packers and SSSV (type and measured depth~acker @ 8592' and SSSV @2944' RECEIVED 13. Stimulation or cement squeeze summar~ee Attachment Intervals treated (measured) Treatment description including volumes used and final pressure ORIGINAL JUL 14- 1998 Alaska 0ii & (.~as Cons. Commission Anchorage 14. Prior to well operation Subsequent to operation Representative Daily Average Production or Injection Data OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure 718 955 889 1530 2408 8069 2167 336 Tubing Pressure 227 177 15. Attachments 16. Status of well classification as: Copies of Logs and Surveys run Daily Report of Well Operations OilX Gas Suspended 17. I hereby certify that the f~.egoing is true,,~d Signed __ _~_ __ Service Date ~//~'~ Form 10-404 Rev 06/15/88 correct to the best of my knowledge. Title Technical Assistant III SUBMIT IN DUPLICATE H-18 DESCRIPTION OF WORK COMPLETED REPERF 03/01/98 SUMMARY The following interval were reperforated using 2 7/8" guns, 6 SPF, random orientation and 60° phasing. 9447'- 9459' MD 9459' - 9467' MD LARRY GRANT ' Attn. ALASKA OIL + GAS CONSERVATION 3001 PORCUPINE DRIVE D~/CHO~AGE DiK, 99501. Date: 9 January 1996 RE: Transmittal of Data Sent b'£: l~~ CA_RR¥ Dear Sir/Madam, Enclosed, please find =h~ dana as described below: WELL DESCRIPTION 1 PFC/PERF~ PINAL. BL+RF -Run ! PFC/PERF FINAL BL+RF Run ~ 1 1 PLS FINAL BL+RF Run $ 1 1 PFC/PERF FINAL BL+RF Run # 1 ECC No. " 3820.07 ' 3982.05 · 5632.05 5753.07 -2 Please sign and return to: Attn. Rodney D. Paulson Atlas Wireline Services 5600 B Street Suite 201 ~ ~.~ ~-~ .~'--_ ~~ /~ - Anchorage, AK 99518 ~/ Or FAX to (907) 563-7803 , Received , ,ore, o' ,-"-., STATE OF ALASKA A .~KA OIL AND GAS CONSERVATION COMMI,r '~N REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown . Stimulate X Plugging Pull tubing Alter casing, Repair well __ Perforate Other 2. Name of Operator BP Exploration (Alaska) Inc. 3. Address P. O. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 700' SNL, 1735' WEL, Sec. 21, T11N, R13E, UPM At top of productive interval 456'NSL, 321' EWL, Sec. 15, T11N, R13E, UPM At effective depth 4834'NSL, 4681'EWL, Sec. 15, T11N, R13E, UPM At total depth 445'NSL, 614'EWL, Sec. 15, T11N, R13E, UPM 5. Type of Well: Development X Exploratory Stratigraphic Service 6. Datum elevation (DF or KB) KBE=80.35 feet 7. Unit or Property name Prudhoe Bay Unit 8. Well number H-18(14-15-11-13) 9. Permit number/approval number 82-210 / 10. APl number 50- 029-20880 11. Field/Pool Prudhoe 0il Pool 12. Present well condition summary Total depth: measured true vertical 9810' feet Plugs (measured) 9268' feet Effective depth: measured 9765' feet Junk (measured) true vertical 9226' feet Casing Length Size Cemented Structural -- Conductor 110' 20"x 30" 8 cu. yds. Concrete Surface 2460' '3 3/8" 3572 c.f. Permafrost II Intermediate 8929' 9 5/8" 1193 c.f. Class G; Production -- 67 c.f. Permafrost il Liner 1123' 7" 390 c.f. Class G w/18% salt Perforation depth: measured 9392'-9467', 9496'-9540' Sqzed 9480'-9496' Measured depth 145 2495 8964 8687-9810 true vertical subsea8801'-8870', 8897'-8938' Sqzed 8882'-8897' Tubing (size, grade, and measured depth) 7'Y5 1/2" to 8592' w/4 1/2 tailpipe 8762 Packers and SSSV (type and measured depth) Packer @ 8592' and SSSV @2944' 13. Stimulation or cement squeeze summary See Attachment Intervals treated (measured) Treatment description including volumes used and final pressure True vertical de~h BKB 145 2530 8434 8176-9223 PZ:..C.EJ V E D MAY 2 5 1995 Uii & Gas Cons. Commission Anch0r~, 14. Prior to well operation Subsequent to operation Representative Daily Average Production or Injection Data OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure 718 955 889 1530 2408 8069 2167 336 Tubing Pressure 227 177 15. Attachments Copies of Logs and Surveys run Daily Report of Well Operations 16. Status of well classification as: Oil X Gas Suspended Service 17. I hereby certify that the foregoing Form 10-40'4 Rev 06/15/88 / is true and correct to the best of my knowledge. /~//~,~ ' Title Senior Technical Assistant II Date SUBMIT IN DUPLICATE 3/11/94 09~5~4 WELL H-18(14-15-11-13) Stimulation Operation A HCL Treatment was performed to remove scale using the following fluids: SUMMARY 1. RIH WITH 3.5" JETTING NZL, TAG TD AT 9627 Fl' CTD. LOST 400 LBS AT 8825 FT. LAY IN 28 BBL OF 9.0 PPG KCL WATER ACROSS PERFS AND SUMP TO KEEP ACID FROM FALLING. 2. STG 30 BBL 7%HCL / 10% XYLENE AND RECIP NZLE FROM 8400- 9300 FT BKB. LET ACID SOAK 10 MIN. FLOW WELL 20 MIN. TO CLEAR ACID FROM LINER. 3. STG 30 BBL 7% HCL ACID / 10% XYL AND RECIP NZL FROM 8500- 9300 FT BKB. LET ACID SOAK 10 MIN. FLOW WELL WITH GAS LIFT. 4. POOH 5. WELL CLEANED OUT TO 9627 PT BKB WITH 3.5" NOZZLE AS A DRIFT. READY FOR PERF GUNS. WELL FLOWING WITH GAS LIFt. 6. WELL IS FLOWING AT 150 DEG, WHICH IS 30 DEG WARMER THAN BEFORE THE SCALE CLEANOUT, FWHP IS STILL 240 PSI, SO GAS FROM SQZ PERFS IS NOT INDICATED. THE CLEANER TBG/LINER MAY ALLOW A BETTER RATE. DO YOU WANT TO TEST THE WELL BEFORE DOING THE ADD PERFS? 90 59 FLUIDS PUMPED BBLS. 3 MICRON FILTERED 69F SEA WATER 7.5 % HCL ACID / 10% XYLENE 28 KCL WATER, 9 PPG 34 MEOH 211 TOTAL A HCL Treatment was performed to remove scale using the following fluids: OPERATIONS SUMMARY RIH AND TAGGED T.D. AT 9583 FT. LAID A 60 BBL 9.1 PPG KCL BRINE PILL ON THE BOTTOM OF THE HOLE.PUMPED A 30 BBL 15 % HCL/10 % XYLENE TUBING WASH FROM 8200 FT TO 8575 Fr. THE TUBING HAD AN OBSTRUCTION AT THAT DEPTH. UNABLE TO JET ACID THROUGHT THE OBSTRUCTION AT 3 BPM. THE DOWN PASS AS ABORTED. AFTER A 10 MINUTE ACID SOAK, THE WELL WAS FLOWED. ON A CHECK PASS THE OBSTUCTION HAD MOVED UP HOLE TO GLM #5 AT 7759 FT. GAS LIFT WAS TURNED ON AND THE OBSRUCTION WAS BLOWN UP THE HOLE. THE SECOND ACID (30 BBL )JOB WAS PERFORMED FROM 8650 FT TO 9300 FT WITH THE WING VALVE CRACKED OPEN. NO FURTHER OBSTRUCTIONS WERE FOUND. NOTE: SLICK LINE SAW THE OBSTRUCTION AT 8583 FT WITH A 3.6 INCH N07,~ F. RECEIVED MirY 2 5 1995 Alaska Oti& Gas Cons. Commission Anchora~ : ~ 121 BBLS FLUIDS PUMPED FILTERED SEA WATER, WITH 0.2 % SURFACTANT 60 BBLS 15 % HCL WITH 10 % XYLENE 2 BBLS METHANOL Page 2 10/05/94 WELL H-18(14-15-11-13) A Bullhead Scale Inhibition Treatment was performed to remove scale using the following fluids: PUMP SUMMARY: 100 BBLS SW PRE-FLUSH W/2.5% WESTSCALE & .2% NE41 40 BBL SW SPACER W/50 PPM WESTSCALE & .2% NE-41 160 BBL SW TREATMENT VOLUME W/10% ESL-19P WITH ACTIVATOR 190 BBL SW OVERFLUSH W/50 PPM WESTSCALE & .2% NE-41 300 BBL SW DISPLACEMENT W/.2% NE41 RECEIVED MAY 25 1995 Alaska Oil I Gas Cons. Commission ~kn~hora~:~ ,._.. STATE OF ALASKA .._... ALAE OIL AND GAS CONSERVATION COMMISSK REPORT OF SUNDRY WELL OPEHATIONS 1. Operations performed: Operation shutdown Stimulate Plugging Perforate X Pull tubing Alter casing Repair well Other 2. Name of Operator BP Exploration (Alaska) Inc. 3. Address P. O. Box 196612, Anchorage, Alaska 99519-6612 5. Type of Well: Development X Exploratory Stratigraphic Sewice 4. Location of well at surface 700' SNL, 1735' WEL, Sec. 21, T11N, R13E, UPM At top of productive interval 456' NSL, 321' EWL, Sec. 15, T11N, R13E, UPM At effective depth 4834'NSL, 4681' EWL, Sec. 15, T11N, R13E, UPM At total depth 445'NSL, 614'EWL, Sec. 15, T11N, R13E, UPM 12. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical 9810' feet 9268' feet 9765' feet 9226' feet Plugs (measured) Junk (measured) 6. Datum elevation (DF or KB) KBE=80.35 feet 7. Unit or Property name Prudhoe Bay Unit 8. Well number H-la(14-15-11-13) 9. Permit number/approval number 82-210 / 10. APl number 50- 029-20880 11. Field/Pool Prudhoe Oil Pool Casing Length Structural -- Conductor 110' Surface 2460' Intermediate 8929' Production -- Liner 1123' Perforation depth: measured true vertical Size 20"x 30' '3 3/8" 9 5/8" 9392~9467' 9480~9540' subsea8801~8870' 8883~8938' Tubing (size, grade, and measured depth) Cemented 8 cu. yds. Concrete 3572 c.f. Permafrost II 1193 c.f. Class G; . 67 c.f. Permafrost II 390 c.f. Class G w/18% salt 7"/5 1/2" to 8592' w/4 1/2 tai/pipe 8762 Measured depth 145 2495 8964 8687-9810 Packers and SSSV (type and measured depth) Packer @ 8592' and SSSV @2944' True vertical depth BKB 145 2530 8434 8176-9223 0 9 994 13. Stimulation or cement squeeze summary Intervals treated (measured) See Attachment Gms Gons. OommJ.'~'.mn Treatment description including volumes used and final pressure 14. Representative Daily Average Production or Injection Data OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation Subsequent to operation 470 /244 653 2030 1080 1973 1041 0 196 256 15. Attachments Copies of Logs and Surveys run Daily Report of Well Operations 16. Status of well classification as: Oil X Gas Suspended Service 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sic~ned ~~,~,~ (~ ~:~ ~u-~ TitleSeniorTechnicalAssistantl Form 10-404'Rev 06/15/88 Date SUBMIT IN DUPLICATE 3~30~93 10~3~3 fjh 4/11/94 WELL H-18(14-15-11-13) Reperf The following interval were reperforated using 3 3/8" guns, 4 SPF, random orientation and 90° phasing. 9496' - 9540' MD The following interval were reperforated using 3 3/8" guns, 4 SPF, random orientation and 60° phasing. 9459' - 9467' MD This is to acknowled~_ receipt of the following p~znts and negatives. COMPANY: STATE OF ALASKA-ALASKA OIL & GAS CONSERVATION COMM. ATTENTION: LARRY GRANT FIELD: PRUDHOE 'BAY '~$~/05 S I GNED DATE Please return one copy of signed transmittal to each of the following: Atlas Wireline Services Pouch 340013 Prudhoe Bay, AK 99734 BP Exploration (Alaska) Inc. Petrotechnical Data Center MB 900 E. Benson Blvd. Anchorage, AK 99519-6612 FT/RTNCARD1 P:~'SE SIGN ONE COPY ~ RETU~ TO: ATLAS WIRELINE SERVICES Pouch 340013 Prudhoe Bay, AK 99734 This is to acknowledge receipt of the following prints and negatives. COMPANY: STATE OF ALASKA OIL & GAS CONSERVATION COMM. ATTENTION: LARRY GRANT FIELD: PRUDHOE BAY WELL - LOG DESCRIPTION PRINTS NEGS. SEPIA . , ~-~5 E-03 .......... PLS 5" !~~ !~~ 0 1 ......... ~?q N-09 CN/GRI~ 5" ~_ 1 .q~ 0 1 ,,, , , ............ 7~B Q-07. CN/GR ... 5" ~ 0 1 ...... .. ,, ....... , ........... ...... , , , , ~-[q W-07 PDK-100 GR/~U 5" [~! }q~ 0 1 ,. , . , k ., , , ~5~ttO Z-07 A PFC~PERF)G~ 5" 1~a~& [Tq~ 0, 1 ~[0~ Z-12 PDK- 100 GR 5" 0 1 . ........... q~!.. Y-36 BHC/AC GR 2~" !l~~11~°~5 0 1 .. . , .,, , ,., ,. , .... DIFL/GR 2~'t IIO~A ~%~ 0 1 , .... , , ........ . ,. , 10/11/93 (jsd) ......... ,.., , ....... BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard RO. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 DATE: 10/4/93 T# 85080 BPX/PBU ~TAPE W/ LISTING Enclosed is your copy of the materials listed below. If you have any questions, please contact BP Well Records at (907) 564-4004. H-18 CH/CNL FIN Q8/24/93 8933.00- 9613.00 1600BPI API#500292088000 9486->TP# ATLAS REF#5632.02 Information Control Well Records BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage. Alaska 99519-6612 (907) 561-5111 DATE: 09/03/93 T# 84966 BPX/PBU ~LOGS Enclosed is your copy of the materials listed below. If you have any questions, please contact BP Well Records at (907) 564-4004. 0-26 ~ PFC / 08/23/93 #1 G-10 ~[-t~ PRODUCTION LOGW 08/24/93 #1 H-18 ~-~%DCNL~ 08/24/93 #1 R-04 ~'~ CNA ~~ 08/24/93 #1 U-04A~-~q~ERF)~O~CL~ 08/23/93 #1 Y-04 ~q-[05~ERF~C~~ 08/26/93 #1 Y-12 ~ERF] 08/2~/93 #1 10650.00-10953.00 ATLAS 5 " 9650.00-10018.00 ATLAS 5 " 8950.00- 9613.00 ATLAS 5 " 9100.00- 9803.00 ATLAS 5 " 10654.00-11112.00 ATLAS 5 " 9900.00-10200.00 ATLAS 5 " 9033.00- 9180.00' ,~q~,~ -~ " Information Control Well Records BP EXPLORATION ... .* BP Exploration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 DATE: 04/01/93 TlC 84417 BP/PBU CH LOGS Enclosed is your copy of the materials listed below. If you have any questions, please contact BP Well Records at (907) 564-4004. ~~-18 ., P-06 ~'~4 $~37 q x-14^ Information Control Well Records PRODUCTION LOG 03/24/93 PFC 03/30/93 PRODUCTION LOG 03/25/93 PRODUCTION LOG 03/21/93 PRODUCTION LOG 03/29/93 PERF 03/25/93 PRODUCTION LOG 03/23/93 PRODUCTION LOG 03/26/93 PRODUCTION LOG 03/22/93 PRODUCTION LOG 03/22/93 PDK-100/GR 03/27/93 //1 #1 11000.00-11400.00 9350.00- 9595.00 9900.00-10190.00 12050.00-12460.00 9950,Q0--10300.00 9500.00- 9782.00 9100.00- 9590.00 9750.-00-10080.00 9000.00- 9680.00 9000.00- 9680.00 11550.00-12000.00 ATLAS 5" ATLAS' 5" ATLAS 5" ATLAS 5" ,ATLAS 5" ATLAS 5" ATLAS 5" ATLAS 5" ATLAS 5" ATLAS 5" ATLAS 5" RECEIVED APR 0 5 1993 Alaska 011 & Gas Cons. Commbsion Anchorage ,' STATE OFALASKA '"-" U !~'~ ~ f~'~ ~ A!_ ,A OIL AND GAS CONSERVATION COMMIS ,~1 REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: '0Perati~)n shutdown Stimulate × Plugging Perforate X Pull tubing Alter casing Repair well Other 2. Name of Operator BP Exploration (Alaska) Inc. 3. Address P. O. Box 196612, Anchorage, Alaska 99519-6612 5. Type of Well: Development Exploratory Stratigraphic Service 6. Datum elevation (DF or KB) KBE=80.35 f e et 7. Unit or Property name Prudhoe Bay Unit 8. Well number H-18(14-15-11-13) 9. Permit number/approval number 82-210/ 10. APl number 50- 029-20880 11. Field/Pool Prudhoe Oil Pool 4. Location of well at surface 700' SNL, 1735' WEL, Sec. 21, T11N, R13E, UPM At top of productive interval 456'NSL, 321' EWL, Sec. 15, T11N, R13E, UPM At effective depth 4834'NSL, 4681' EWL, Sec. 15, T11N, R13E, UPM At total depth 445' NSL, 614' EWL, Sec. 15, T11N, R13E, UPM 12. Present Well condition summary Total depth: measured 9810'feet Plugs (measured) true vertical 9268'feet Effective depth: measured 97651eet Junk (measured) true vertical 92261eet Casing Length Size Cemented Structural -- Conductor 110' 20"x30" 8 cu. yds. Concrete Surface 2460' 13 3/8" 3572 c.f. Permafrost fl Intermediate 8929' 9 5/8" 1193 c.f. Class G; Production -- 67 c.f. Permafrost II Liner 1123' 7" 390 c.f. Class G w/18% salt Perforation depth: measured 9392'-9467' 9480;9540' Measured depth 145 2495 8964 868~9810 True vertical depth BKB 145 253O 8434 8176-9223 true vertical subsea8801'-8870' 8883~8938' Tubing (size, grade, and measured depth) 7"/5 172"to 8592' w/4 1/2 tailpipe 8762 Packers and SSSV (type and measured depth) Packer @ 8592' and SSSV@2944' 13. Stimulation or cement squeeze summary See Attachment RECEIVED 00T - 8 !992 Alaska Oil & Gas Cons. 6ommission Intervals treated (measured) Treatment description including volumes used and final pressure 14. Prior to well operation Subsequent to operation Representative Daily Average Production or Injection Data OiI-Bbl Gas-Mcr Water-Bbl Casing Pressure 20o0 22o 0 1000 ~'"~' 2000..--~- 250 0 Tubing Pressure 2000 2OO 15. Attachments Copies of Logs and Surveys run Daily Report of Well Operations 16. Status of well classification as: Oil X Gas... Suspended Service 17. I hereby ce¢ify that th eforegping is t~ correct to the best of my knowledge. Signed~~/~' ~, (/ Title Senior TechnicalAssistantl Form lO-40~F~v 06/15/88 Date SUBMIT IN DU'PLI~ATE WELL H:!8 (!4-~15-11-13) N R W O[~.A.d d P,.e rf/H C L/R e perf 8/14/91 A NRWO was performed using the following fluids: 515 bbls PW to Load Well 5 bbls EW(Preflush) 14 bbls Cement 16 bbls DUO Polymer 212 bbls PW(Reverse Out) 24 bbls EDTA(Preflush) 22 bbls EW(Spacer) 16 bbls PW(Displacement) 44 bbls PW(Jet Pass) 48 bbls PW(Final Reverse Out) 110 bbls Recovered(N2 Displacement) Well Cleaned Out to 9737' 366 bbls Load fluid behind pipe(Cumulative approximate total load fluid behind pipe is *** bbls) 13 bbls cement recovered(Does Not Include cement not pumped) EDTA: 2.5% EDTA, 2.5% KCL, 16% MUSOL, .5% LS-300. Cement: 15.5 ppg class G cement containing, .2% CFR-3, .012% HR-12, .15 GAL/SK HALAD-344L 8/19/91 The following additional interval were perforated using 3 3/8 guns with 6 shot density, random orientation and 60 degree phasing. 9520' 9540' MD 8/28/9 1 A HCL Acid Treatment was performed using the fluids: 24 bbls 15% HCL and 25 LBS L58 Iron stab and 4 GAL A250 Cor. Inhib. and 5 GAL W-35. Emmulsifier and 2 GAL F75N Surfactant 24 bbls Diesel and 100 Gal U66 FREFLO EB. 50 bbls SW-Load TBG. 32 bbls SW-Flush Diesel from CT. 1 0/2 1/9 1 A NRWO was performed using the following fluids: 492 bbls PW to Load Well 5 bbls EW(Preflush) 10 bbls Cement 22 bbls EW(Spacer) 16 PW 15 bbls DUO Polymer(Contaminant) 32 bbls PW(Displacement) 324 bbls PW(Reverse Out) 32 bbls PW(Jet Pass) 64 bbls PW(Final Reverse Out) 67 bbls Recovered(N2 Displacement) 35 bbls MEOH(FREEZE PROTECTION CT) R E C E IV E D OCT - 8 1 92 Alaska 0il & Gas Cons. CommissiOn Anch0rago Page 2 W.ELL H-18 (14-15-1.1-13) Well Cleaned Out to 9471' 0 bbls load fluid behind pipe today(approx total is 366 bbls) 9-10 bbls cement recovered(does not include cement not pumped) CEMENT: 15.5 PPG Class G Cement Containing, .2% CFR-3, 016% HR-12, .21 GAL/SK HALAD-344 L SQZ #2 10/22/91 A NRWO was performed using the following fluids: 170 bbls PW to Load Well 5 bbls EW(Preflush) 10 bbls Cement 22 bbls EW(Spacer) 15 bbls DUO Polymer(Contaminant) 17 bbls PW(Displacement) 140 bbls PW(Reverse Out) 24 bbls PW(Jet Pass) 40 bbls PW(Final Reverse Out) 69 bbls Recovered(N2 Displacement) 32 bbls MEOH(FREEZE PROTECTION CT) Well Cleaned Out to 9466' 5 bbls load fluid behind pipe today(approx total is 371 bbls) 9 bbls cement recovered CEMENT: 15.5 PPG Class G Cement Containing, .2% CFR-3, 012% HR-12, .15 GAL/SK HALAD-344 L SQZ #3 1 1/1 8/91 The following additional interval were reperforated using 3 3/8 guns with 6 shot density, random orientation and 60 degree phasing. 9462' 9467' MD 09/08/92 fjh RECEIVED OCT g 1B° 2 Alaska Oil & Gas Cons. Anchorage BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 3 DATE: 06/16/92 T~ 83596 BP CASED HOLE FINALS Enclosed is your copy of the materials listed below. If you have any questions, please contact BP Well Records at (907) 564-4004. H-18 ~,~OPROD_F 03/10/92 #1 W-15 ~,3'3 GAS LIFT SURVEY 02/28/92 #1 W-26 ~ GAS LIFT SURVEY 02/29/92 #1 X-17 ~1-16~ BRIDGE PLUG 03/30/92 #1 9250.00- 9602.00 HLS 5 " 2802.00-11194.00 HLS " 3141.00-11008.00 HLS " 8818.00- 9845.00 HLS 25 " Info~ation Control Well Records Adrian J. Martin RECEiVED JUN 2 6 1992 Alaska Oil & Gas Cons. Commission Anchorage BP EXPLORATION BP Exploration (Alaska) Inc. gOO East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 DATE: 03/09/92 T9 83309 BP CASED HOLE FINALS Enclosed is your copy of the materials listed below. If you have any questions, please contact BP Well Records at (907) 564-4004. w- 31 ~-/~p ROD-F E-05 ~'' .) PROD-F E-01 ~,~,-. F _O-" PROD-F D-05 ~.~ LEAK DET E- 18 ~/-/3~ p ROD-F Y-04 ~f--/e ~' PROD-F E-29 F?-~3 PROD-F H-18 ~2-~/o PROD-F 02/13/92 91 02/08/92 91 02/08/92 91 02/11/92 #1 -02/09/92 #1 02/14/92 #2 02/09/92 91 02/16/92 #1 02/13/92 #1 11500.00-11780.00 CAMCO 5 " 8750.00-10010.00 CAMCO 5 " 9300.00- 9700.00 CAMCO 5 " 500.00-10578.00 CAMCO 2/5" 10900.00-11150.00 CAMCO 5 " 10050.00-10300.00 CAMCO 5 " 12050.00-12223.00 CAMCO 5 " 9350.00- 9600.00 CAMCO 5 " 12100.00-12315.00 CAMCO 5 " Information Control Well Records Adrian J. Martin RECEIVED MAR 2 4 1992 Alaska 0il & cams Cons. C0mmission Anchorage BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard PO, Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 DATE: 02/19/92 T9 83261 BP CASED HOLE FINALS Enclosed is your copy of the materials listed below. If you have any questions, please contact BP Well Records at (907) 564-4004. 02/13/92 #1 9100.00- 9430.00 ATLAS 5 " 02/12/92 ~1 11160.00-11325.00 ATLAS 5 " 02/10/92 %1 11250~00-11528.00 ATLAS 5 " 02/10/92 %1 9582.00- 9852.00 SCH 5 " 02/11/92 ~1 11500.00-11973.00 SCH 5 " 02/12/92 #1 9250.00- 9600.00 ATLAS Information Control Well Records Adrian J. Martin BP EXPLORATION BP Ex01oration (Alaska) Inc. 900 East Benson Bouievard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 DATE: 12/11/91 T# 83085 BP CASED HOLE FINALS Enclosed is your copy of the materials listed below. If you have any questions, please contact BP Well Records at (907) 564-4004. FF~~2.940~ ~' \\C~CL 40/~j¥~ PERF 4 "~ ..,~, PERF 9~ °~.~ PERF 18/qO PRODUCTION LOG 12/03/91 ~1 12/04/91 #1 12/05/91 ~1 11/09/91 ~3 11/19/91 91 11/17/91 ~1 11/16/91 ~1 10/21/91 il 11/28/91 ~1 11/28/91 ~1 9468.00-10768.00 SCH 9560.00-10680.00 SCH 10100.00-10632.00 SCH 9822.00-10206.00 HLS 9250.00- 9626.00 HLS 12103.00-12482.00 HLS 12330.00-12645.00 HLS 10230.00-10320.00 HLS 11040.00-11040.00 SCH 10950.00-11172.00 SCH 5 " 5 " 5 " 5 " 5 " 5 " 5 " 5 " Information Control' Well Records Adrian J. Martin RECEIVED DEC 1 8 1991 '.Alaska 0ii & Gas Cons. Commission Anchorage BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard RO. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 RECEIVED OCT 18 1991 Alaska Oil & Gas Cons. Commission Anchorage BP CASED HOLE FINALS Enclosed is your copy of the materials listed below. If you have any questions, please contact BP Well , Records at (907) 564-4004. , DATE: 10/10/91 T# 82910 3~~~-~ PITS 09/20/91 #1 10860.00 PITS 09/07/91#1 10800.00 91-tf Y-30u'~' CCL 09/16/91 ~1 8650.000 ~0-~ Y-2'9u~' CCL 09/16/91 ~1 10131.00 ~3-3~N-t9~ CCL 09/25/91 #1 9000.000 ~-~W-38/ GAS LIFT SURVEY 09/15/91 #1 200.0000 ~Z-17&B-21V PROD-F 08/13/91 #1 9550.000 ~1-~0 Y~26~ GAS LIFT SURVEY 09/16/91 #1 5400.000 ~0 X-26~ INJ 09/24/91 #1 9150.000 %~-05~ CL 09/07/91 #1 9100.000 ~9.~-06~ INJ 09/11/91 91 9800.000 ~-~3~LO2A~ PROD-F 08/24/91 91 11000.00 [~-~W-09~ GR 09/11/91'91 14200.00 7~&/E-03/ PROD-F 09/25/91 91 12450.00 9o-~W-16~~ LEAK DET 09/19/91 91 2000.000 ~-{~R-22/ PROD-F 08/20/91 #1 10350.00 ~-~O B-32u/' TEMP 09/15/91 91 10275.00 ~-o7 C-04~ PROD-F 08/24/91 91 10350.00 ~-~7~G-26~ CL 09/04/91 91 10200.00 ~B-20J LEAK DET 08/23/91 91 7992.000 gO-~P-20 / LEAK DET 08/23/91 #1 11800.00 7~ R-04~ GAS LIFT SURVEY 09/04/91 #1 3200.000 ~-~-18~ PROD-F 09/25/91 #1 9250.000 f~'-~?W-37~ PROD-F 09/15/91 #1 9800.000 ~'{93S-0'5/ CL 09/15/91 #1 9500.000 f~-I~F-2~/ TEMP 09/03/91 #1 11800.00  \.~H-16~ PROD-F 08/26/91 #1 10850.00 ~.$~R-04~ GAS LIFT SURVEY 08/26/91 #1 2500.000 ~G~ B-32~ INJ 09/06/91 #1 , 10240.00 ~9.~0W-26~ JEWELRY LOG 08/22/91 #1 CAMCO 5 ~-IO~ W-11~ JEWELRY LOG 08/21/91 #1 CAMCO 5 CAMCO 5 08/23/91 #1 10900. 12550. 9950.0 11444.00 CAMCO 11140 . 00 CAMCO 9240 . 000 CAMCO 12500 . 00 CAMCO 9755. 000 CAMCO 4000. 000 CAMCO 98~0. 000 CAMCO 10986.00 CAMCO 9680 . 000 CAMCO 10941.00 CAMCO 10279 . 00 CAMCO 11480 . 00 CAMCO 15162 . 00 CAMCO 12685 . 00 CA~. CO 11270 . 00 , CAMCO 10720 . 00 CAMCO 10953.00 CAMCO 10660 . 00 CAMCO 10522 . 00 CAMCO 9062.000 CAMCO 12553 . 00 CAMCO 8639.000 CAMCO 9722. 000 CAMCO 10100.00 CAMCO 10224 . 00 CAMCO 12175.00 CAMCO 11150 . 00 CAMCO 9821. 000 CAMCO 10807 . 00 CAMCO 00 11758.00 00 13284.00 00 10120.00 5 5 5 5 5 2 5 5 5 5 5 5 5 5 2/5 5 5 5 5 5 5 5 5 5 5 5 5 2/5 5 BP EXPLORATION BP Exploration (Alaska) Inc, 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 TO: DISTRIBUTION Date :08/26/91 Ti¢:82762 FROM: Information Control Well Records LR2-1 SUBJECT: BP CASED HOLE FINALS Enclosed is your copy of the matedai listed below. If you have any questions, please contact BP Well Records at (907) 564-4445. A-05 A-01 H-18 N-15 TUBING CUTTER 08/20/91 #1 8984-9140 ATLAS 5" CL 08/15/91 #1 10700-11030 ATLAS 5" CCI_/PERF 08/18/91 #1 8600-8734 ATLAS 5" CCL/PERF 08/19/91 #1 9250-9700 ATLAS 5" PLS 08/14/91 #1 9500-10140 ATLAS 5" Distribution: ARCO CHEVRON EXXON GEOSCIENCES MOBIL PHILLIPS RESERVOIR STATE OF ALASKA ARCHIVES BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard PO. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 TO: DISTRIBUTION Date :12/04/90 T#:81860 FROM: SUBJECT: Information Control Well Records LR2-1 BP CASED HOLE FINALS Enclosed is your copy of the matedal listed below. If you have any questions, please contact BP Well Records at (907) 564-4445. D-23 PITS 11/06/90 ' G-02 Leak Det 11/17/90 , H-18 Prod-F 11/07/90 H-18 Collar Log 11/02/90 · R-26A GR Temp 11/15/90 - U-02 GR/TIE !N 11/19/90 · Y-18 INJ 11/14/90 Z-25 Leak Det 11/08/90 #1 9850:11515 Camco 5" #1 10100-10201 Camco 5" #1 9250 -9734 Camco 5" #1 9250-9734 Camco 5" #1 7440-9365 Camco 5" #1 9450-10061 Camco 5" #1 10850-11290 Camco 5" #1 9600-10092 Camco 5" Distribution: ARCO CHEVRON EXXON GEOSCIENCES MOBIL PHILLIPS RESERVOIR STATE OF ALASKA ARCHIVES RECE VED D£C 0 1990 A!aska Oil & G-es Cons. Commission Anchcrage SOHIO ALASKA PETROLEUM COMPANY SFO ARCO CHEVRON EXXON TO: SFO/UNIT/STATE: TE,'CACO (-Marathon) MOBIL PHILLIPS STATE OF AK BPAE 31 I 1 "C" STilE{ET ANCHORAG[. ALASKA TELEPHONE I9071 265-0000 MAIL: POUCH 6-612 ANCHORAGE. ALASKA 99502 Date: 3/6/85 T#: 76036 REFERENCE: SOHIO CASED HOLE FINAL LOGS . The following material is being submitted herewith. Please acknowledge receipt by signing a [~cTohl~¥ of this letter and returning it to this office:-- SFO/UNI T/STATE: -H~:18 H-19 N-18 CFS 2/03/85 #1 9250-9600 Go -. CFS 2/05/85 #1 11100-11510 Go 5" CFS 2/07/85 #1 9700-10000 Go 5" RI C[~vfD ~ . ~~r., Ca%hy Perkins Development CeoloAy 5as Cons. Co~mJssJo~ Anchorage SOHIO ALASKA PETROLEUM COMPANY SFO A~C0 CHEVRON EXXON TO: SFO/UNIT/STATE: TEXACO (-Marathon) MOBIL PHILLIPS BPAE (Transmittal Only) INDEXED 3111 "C" STREET ANCHORAGE, ALASKA TELEPHONE (907! 265-0000 MAIL: POUCH 6-612 ANCHORAGE, ALASKA 99502 Date: T~: 3/5/85 76035 REFERENCE: SOHI~NAL DATA- PRESSURE sURVEY DATA  llowing material is being submitted herewith. Please acknowledge receipt by signing a f this letter and returning it to this office:-- H_8~/ H-17V H-19 H-20 K_6~- K-2A ~-17 ~-18 ~-3 ~ R-9 ~ R-10 8-8 ~ PBU & BHPD 1/31-2/2/85 Flowing Gradient & BHPD 1/30-2/1/85 PBU & BHPD 2/3/85 & 2/4/85 PBU & BHPD 2/5/85 & 2/6/85 Flowing Gradient & BHPD 2/2-2/3/85 Static Gradient Static Gradient Static Gradient Static Gradient Static Gradient Gradient & BHPD Flowing Gradient PBU & BHPD Static Survey Static Gradient PBU & BHPD PBU & BHPD Go Camco Go Go Camco 2/6/85 Camco 2/8/85 Camco 2/10/85 Camco 2/12/85 Camco 1/4/85 Otis 1/17 & 1/19/85 Camco 1/17-1/18/85 Camco 2/7 & 2/8/85 Go 12/2/84 Go 2/18/85 Otis 2/14 & 2/17/85 Go 2/9 & 2/11/85 Go RECEIVED OATE ~__~.__~-..~.__~'-~_. /~/~ Cathy Perkins ~ '"' ~: 'J- ~-~~evelopmen t Geology ~' 19 Well Records ............ ~e:;~a ~m ~.Sas Co~s. ' ~;chorag9 SOHIO ALASKA PETROLEUM COMPANY SFO ARCO CHEVRON EXXON TO; SFO/UNIT/STATE: TE~YACO (-Marathon) MOBIL PHILLIPS BPAE (Transmittal Only) INDEXED' 3111 "C" STREET ANCHORAGE, ALASKA TELEPHONE (907) 265-0000 MAIL: POUCH 6-612 ANCHORAGE, ALASKA 99502 Date: 02/05/85 T#: 75990 REFERENCE: S~ FINAL DATA - PRESSURE SURVEY DATA he following material is being submitted herewith. Please acknowledge receipt by signing a copy of this letter and returning it to this office:-- A-14// -PBU & BHPD Sheet 11/12,13/84 GO B-2~ PBU & BHPD Sheet 11/11/84 GO Flowing Gradient & BHPD 11/27-29/84 Camco ~H~i-8/ Static Survey 01/07/85 GO H-19"-- St-atic 01/03/85 Otis H-20-'~' Static 01/02/85 GO J-16-'" PBU & BHPD 11/24,25/84 GO J-17~''/ PBU & BHPD 11/17,18/84 GO M-7t~-- PBU & BHPD 11/06,07/84 GO N-7'''~ Static 12/07/84 Otis N-10'~ Static 01/07/85 Camco R-9~ - PBU & BHPD 12/12 13/84 GO R-16'-' PBU & BHPD 11/08,09/84 GO R-18--~ Static 11/26/84 GO X-7~' Flowing Gradient & BHPD 01/03-05/85 Camco X-9/ Static Gradient 12/04/84 GO X-14-'~ Flowing Gradient & BHPD 12/31/84-1/02/85 Camco RECEIVED DATE ,,a.~ ... . _ ~9 Well Records Anc'..-,ora~e SOHIO ALASKA PETROLEUM COMPANY 3111 "C" STREET, ANCHORAGE, ALASKA TELEPHONE (907) 561-5111 MAIL: POUCH 6-612 ANCHORAGE, ALASKA 99502-0612 January 23, 1985 Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Attention: Mr. C. V. Chatterton Gentlemen: Well H-18 (14-15-11-13) PBU Enclosed, in duplicate, are the following forms for the above-named well. 1. Form 10-407, Completion Report; 2. Form 10-403, Sundry Notice and Reports on Wells; 3. Form 10-404, Monthly Report of Drilling and Workovers. Enclosures cc: A. E. Leske Geology Well File ~17 Yours very truly, James A. Bragg District Petroleum Engineer (Acting) RECEIVED JAN 2 5 1985 Alaska 0il & Gas Cons. Commission Anchorage · ~' STATE OF ALASKA -~-- ALASKA.,_.'- AND GAS CONSERVATION C£ MISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1. Status of Well Classification of Service Well OIL ~] GAS [] SUSPENDED [] ABANDONED [] SERVICE [] .. 2. Name of Operator 7. Permit Number Sohio Alaska Petroleum Company 82-210 3. Address 8. APl Number P.O. BOX._6612' Anchorage, Alaska 99502 50- 029-20880 4. Location of well at surface 9. Unit or Lease Name 700' SNL, 1735' ~EL, Sec. 21, TllN, R13E, UPM Prudhoe Bay Unit At Top Producing Interval Top of Sag. R. Sst. 10. Well Number 456' NSL, 321' E~L, Sec. 15, TllN, R13E, UPM H-18 (14-15-11-13) PBU At Total Depth 11. Field and Po61 445' NSL, 614' EWL, Sec. 15, TllN, R13E, UPM Prudhoe Bay 5. Elevation in feet (indicate KB, DF, etc.) I 6. Lease Designation and Serial No. prudhoe Oil Pool KBE = 80.35' AMSLJ ADL 28284 12. Date Spudded 13. Date I.D. Reached 14. Date Comp., Susp. or Aband. 15. Water Depth, if offshore 16. No. of Completions 12-23-82 1-3-83 1--8--83 feet MSL One 17. Total Depth (MD+TVD) 18. Plug Back Depth (MD+TVD) 19. Directional Survey I 20. Depth where SSSV set I 21.Thickness of Permafrost 9810'~.~D 9268'TVD 9765'MD 9226'TVD YES~] NO[~ 2944 feetMD 20101 22. Type Electric or Other Logs Run DIL/BHCS/~--,/SP, LDT/~L/t-]G~2/CAT., CBL/VDL/GR/CCL, GyrOscopic survey 23. CASING, LINER AND CEMENTING RECORD SETTING DEPTH MD CASING SIZE WT. PER FT. GRADE TOP BOTTOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED 20" x 30" [nsulated2onducto~ Surface 110' 36" 8 c~;y~s; m~.rete 13 3/8" 72# L-80 Surface 2495' 17 1/2" 3572 c~].ft_. D~rrn~:rr~r TI 9 5/8" 47# L-80 Surface 8964' 12 1'/4" 1193 cu.ft. Class G; 67 cu.ft. Permafrost C 7" 26% L-80 86'87' 9810' 8 1/2" 390 cu.ft. Class G w/!8% salt 24. Perforations open to Production (MD+TVD of Top and Bottom and 25. TUBING RECORD interval, size and number) MD TVDss SIZE DEPTH SET (MD) PACKER SET (MD) · . 7"/5 1/2" 8592' 85~2' Prudhoe Oil Pool Top: 9392' 8801' ~r/4 1/2" tai2.pit~ 8762' Bottom: 9540 ' 8938 ' 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. '. DEP.TH INTERVAL (MD) AMOUNT& KIND OF MATERIAL USED 9392'-9467' BKB (8801'-8870' TVDss) 9480 '-9540' BKB (8883'-8938' TVDss) · _ 27. PRODUCTION TEST Date First production Method of Operation (Flowing; gas lift, 'etc.) January 1, 19 85 Flowing Date of Test Hours Tested PRODUCTION FOR OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE IGAS-OILRATIO I TEST PERIOD J~ Flow Tubing Casing Pressure CALCULATED.~ OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-APl (corr) Press. 24-HOUR ~RATE I~ · 28. ~ CORE DATA - Brief description of lithology, porosity, fractures, apparent dipsand presence of oil, gasorwater. Submit core chips. ~EC~./I/ED None J-4 }V ~ ~laska 0il ~'~Ga.s Cons '~nchorage' ¢°rnrniss[on Form 10-407 Submit in duplicate Rev. 7-1-80 CONTINUED ON REVERSE SIDE 29. NAME Sag. R. Sst. Shublik Ivishak GEOLOGIC MARKERS MEAS. DEPTH BE]3 8994' 9026' 9108' TRUE VERT. DEPTH Subse~ 8426 ' 8457' 8534' 30. FORMATION TESTS Include interval tested, pressure data, all fluids recovered and gravity, GOR, and time of each phase. 31. LIST OF ATTACHMENTS 32. f~ I hereby certify that the foregoing is true and correct to the best of my knowledge  District Petroleum Engineer Sig Title Date INSTRUCTIONS General' This form is designed for submitting a complete and correct well completion report and Icg on all types of lands and leases in Alaska. Item 1' Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). Item 23: Attached supplemental records for this well should show the details of any multiple stage cement- ing and the location of the cementing tool. Item 27: Method of Operation' Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In- jection, Gas Injection, Shut-in, Other-explain. Item 28: If no cores taken, indicate "none". Form 10-407 , STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COw, MISSION SUNDRY NOTICES AND REPORTS ON WELLS 1. DRILLING WELL [] COMPLETED WELL ]~q OTHER [] 2. Name of Operator 7. Permit No. Sohio Alaska'Petroleum Company 82-210 3. Address 8. APl Number P.O. Box 6612, Anchorage, Alaska 99502 50-029-20880 4. Location of Well At Surface: 700' SNL, 1735' WEL, Sec. 21, TllN, R13E, UPM 5. Elevation in feet (indicate KB, DF, etc.) KBE = 80.35' A~SL 6. Lease Designation and Serial No. ADT, 28284 9. Unit or Lease Name Prudhoe Bay Unit 10. Well Number H-18 (14-15-11-13) PBU 11. Field and Pool Prudhoe Bay Prudhoe Oil Pool 12. Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data NOTICE OF INTENTION TO: (Submit in Triplicate) Perforate [] Alter Casing [] Perforations Stimulate [] Abandon [] Stimulation Repair Well [] Change Plans [] Repairs Made Pull Tubing [] Other [] Pulling Tubing (Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.) SUBSEQUENT REPORT OF: (Submit in Duplicate) Altering Casing [] Abandonment [] Other 13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any proposed work, for Abandonment see 20 AAC 25.105-170). The follc~ing intervals were perforated January 1, 1985 using Schlumberger 3 3/8" Scallop guns at 6 spf. , ,. A lubricator was installed and tested to 3500 psi on all Well work. . 9392'-9467' BKB (Ref. BHCS/GR, 1/3/83) 9480'-9540' BKB ( " _ ) ., An SSSV was ~et and tested in the ball valve nipple at 2944'. RECEIVED Alaska Oil & Gas Cons. Commission Anchorage lZ~ i hereby certify that the foregoing is tru_g,p,,.az~ correct to the best of my knowledge. District Petroleum Engineer Date Title · he space below for Commission use ~.,~,~..~__ n Conditions of Approval, if any: By Qrder of Approved by COMMISSIONER the Commission Date Form 10-403 Rev. 7-1430 Submit "Intentions" in Triplicate and "Subsequent Reports" in Duplicate PERFORATING DATA - Well H-18 (14-15-11-13) PBU November 25, 1984: December 31, 1984 - January 1, 1985 Pressure tested tubing and inner annulus. Rigged up Schlumberger and perforated the following intervals using 3 3/8" Scallops at 6 spf: 9392'-9467' BKB (Ref. BHCS/GR, 1/3/83) 9480'-9540' BKB ( - ) January 5, 1985: January 7, 1985: January 11, 1985: Shut well in to prepare for static pressure survey. Ran static pressure/temperature survey at 8800' TVDss. Set and tested SSSV in ball valve nipple at 2944'. Well on production. RECEIVED .. Alaska Oii& Gas Con~. ,.---. STATE OF ALASKA ALASKA L _ AND GAS CONSERVATION CO 'AISSION MONTHLY REPORT OF DRILLING AND WORKOVER OPERATIONS . · Drilling well~] Workover operation [] 2. Name of operator 7. Permit No. Sohio Alaska Petroleum ~y 82-210 3. Address 8. APl Number P.O. Box 6612, Anchorage, Alaska 99502 50-029-20880 '4. Location of Well at surface 700' SNL, 1735' ~EL, Sec. 21, Ti]N, R13E, UPM 5. Elevation in feet (indicate KB, DF, etc.) 6. Lease Designation and Serial No. ~ = 80.35' AMSL ADL 28284 9. Unit or Lease Name Prudhoe Bay Unit 10. Well No. H-18 (14-15-11-13) PBU 11. Field and Pool For the Month of. Jan~ ,19 85 12. Depth at end of month, footage drilled, fishing jobs, directional drilling problems, spud date, remarks 13. Casing or liner run and quantities of cement, results of pressure tests 14. Coring resume and brief description 15. Logs run and depth where run 6. DST data, perforating data, shows of H2S, miscellaneous data RECEIVED See Attached Alaska Oil & G;~_s Cons, CommlssJori Anchorage 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. N"OTE--Report on this form is required for each calendar month, regardless of the status of operations, and must be filed in duplicate with the Alaska Oil and Gas Conservation Commission by the 15th of the succeeding month, unless otherwise directed. Form 10-404 Submit in duplicate SOHIO ALASKA PETROLEUM COMPANY 3111 "O" STREET, ANCHORAGE, ALASKA TELEPHONE (907) 561-5111 MAIL: POUCH 6-612 ANCHORAGE, ALASKA 99502-0612 October 30, 1984 Alaska Oil & Gas Conservation Cc~mission 3001 Porcupine Drive Anchorage, Alaska 99501 Attention: Mr. C. V. Chatterton Wells H-17, H-18, H-19 and H-20 PBU Gentlemen: Enclosed, in triplicate, is Form 10-403, Sundry Notices and Reports on Wells, for the above-named wells. These contain our proposals to perforate these wells. / pjw Enclosures cc: A. E. Leske Well File #17 Yours very truly, / /~: A. Bragg ~ L/ 7istrict Petroleum Engineer (Acting) RECEIVED Nov o 1911 Alaska Oil & Gas Cons. Commission Anchorage ,---,.. STATE OF ALASKA ~---~ ALAS[. ')IL AND GAS CONSERVATION '.MMISSION SUNDRY NOTICES AND REPORTS ON WELLS 1. DRILLING WELL [] COMPLETED WE LL:~[] OTHER [] 2. Name of Operator 7. Permit No. Sohio Alaska Petroleum ~y 82--210 3. Address 8. APl Number P.O. BOX 6612, Anchorage, Alaska 99-502 50- 029-20880 4. Location of Well At Surface: 700' SNL, 1735' WEIh, Sec. 21, T1LN, R13E, UPM 5. Elevation in feet (indicate KB, DF, etc.) KBE = 80.35' AMSL 6. Lease Designation and Serial No. ADL 28284 9. Unit or Lease Name Prudhoe Bay Unit 10. Well Number H-18 (.14-15-11-13) PBU 11. Field and Pool Prudhoe Oil Pool 12. Check Appropriate Box; To Indicate Nature of Notice: Report, or Other Data NOTICE OF INTENTION TO: (Submit in Triplicate) Perforate E~ Alter Casing [] Perforations Stimulate [] Abandon [] Stimulation Repair Well [] Change Plans [] Repairs Made Pull Tubing [] Other [] Pulling Tubing (Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.) SUBSEQUENT REPORT OF: (Submit in Duplicate) [] Altering Casing [] Abandonment [] Other 13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any proposed work, for Abandonment see 20 AAC 25.105-170). The following intervals will be perforated in November, 1984, using Schlumberger' 3 3/8" Scallops a% 6 s.p.f. A lubricator will be installed and tested to 3500 psi for all well work. 9392'--9467' BKB (Ref. BHCS/GR, 1/3/83) 9479'--9540' BKB (_ " ) An SSSV will be set and tested in the ball valve nipple at 2944'. RECEIVED Subsequent Work Beported Alaska 0il & Gas Cuns. Anchorage 141~1 hereby certifN that the foregoing is true and correct to the best of my knowledge. ned Title District Petroleum Engineer ~o'w for Commission use ~' v Sonditi/Sn~'of ~ ~ ~ (/ Date Approved by. BY HARRY W. I~UGLEil Returned, By Order of COMMISSIONER the Commission Date Form 10403 Rev. 7~1-80 Submit "Intentions" in Triplicate and "Subsequent Reports" in Duplicate SOHIO ALASKA PETFIOLEUM COMPANY 1'0: SFO - CHEVRGN '' EXXON . SFO/UNIT/ GETTY .- '.; STATE: MARATHON :- 3% 1% "C" 51REET ANCHORAGE, ALASKA TELEPHONE (907J 265-0000 MAIL: POUCH 6-612 ANCHORAGE, ALASKA 99502 Date: 1~,28~83 Trans.#: CC#: 56079 MOBIL PH LIPS BP-~'L~Y~cahsmit tal Only) .~FER~N~:ENTRAL FILES(CC#'s-Transmittal Only) · . . -. IO OPEN HOLE FINAL"LOGs ' · /' The following material is being submitted herewith. Please acknowledge receipt by signing a copy of this letter and returning it to this office:-- SFO/UNIT/STATE: * Date to State Via Drilling: 1~28=.83 . _ H-18 Sch DIL/SFL J;1 1/3./83 8944~933 5 5'"& 2" H-18 Sch BHCS/GR _#1 1/3/83 8944v9750 5" & 2q H-18 Sch LDT~CNL~GR (poro) f;1 1/3/83 8944~9750 5" & 2" H-18 Sch LDT~,CNL.-GR (:rawk f/1 1/3/83 8944~9750 5" & 2" · STATE ONLY: DIRECTIONAL SUR~rEYS: ]'fagnetic Single Shot Directional Surwey Gyroscopic Directional Sur~,ey Date: 12/29/82 Job#'AL1282D39 Job#'AKvBO.-30006 Karen Venn W~ll Records Dept~ Development Geology SOHIO ALASKA PETROLEUM COMPANY 3111 "C" STREET ANCHORAGE, ALASKA TELEPHONE (907) 276-5111 MAIL: P©UCH 6-612 ANCHORAGE, ALASKA 99502 January 31, 1983 Alaska Oil & Gas Conservation Conm%ission 3001 Porcupine Drive AnchDrage, Alaska 99501 Attn: Mr. C. V. Chatterton Gentleman: WRLT'. H'18 (14~15'11'13) PBU Enclosed, in duplicate, is Form 10-407, Well Completion Report, for the above-nam~ well together with the Well History, Well Logs and Directional Surveys. This w~ll has been cc~pleted as a non-perforated oil well. Very truly yours, encs cc: Well File #17 Geology R. H. Reiley DistrictDrilling Engineer RECEIVED Alaska Oil & Gas Cons. Comm/$sior~ Anchorage - ? ,,' ..... ~ STATE OF ALASKA "'--~"' I~ t f"., I ~,t ~. I ' AlASk,~ ~ ~ND GAS CONSERVATION C, .... SSl~ WELL COMPLETION OR RECOMPLETION I I PORT AND LOG Classification of Service Well -1. Status of Well . · OIL I-~ GAS [] SUSPENDED [] ,ABANDONED [] SERVICE [] 2. Name of Operator 7. Permit Number Sohio Alaska Petroleum Company 82-210 3. Address 8. APl Number - Pouch 6-612, Anchorage, Alaska 99502 50- 029-20880 4. Location of well at surface I L©C/~ ~ iC,~',.iS ! 9. Unit or Lease Name 700' SNL, 1735' WEL, Sec. 21, TllN, R13E, UPM w~i~ i Prudhoe Bay Unit At Top Producing Interval Top of Sag. R. Sst.!Surf._~__l; 10. Well Number 456' NSL, 321' EWL, Sec. 15, TllN, R13E, UPM 1B.H. ~j H-18 (14-15-11-13) PBU At Total DepthI 11. Field and Pool 445' NSL, 614' EWL, Sec. 15, TllN, R13E, UPM Prudhoe Bay 5. Elevation in feet (indicate KB, DF, etc.) I 6. Lease Designation and Serial No. Prtz~zoe Oil Pool KBE = 80.35 ' AMSLI ADL 28284 12. Date Spudded12_23_82 13. Date T.D. Reached1_3_83 14' Date C°mp" Susp' °r Aband' 115' Water Depth~ if °ffsh°re 116' N°' °f C°mpleti°ns1--8--83 feet MSL O~e 17. Total Depth (MD+TV•) 18. Plug Back Depth (MD+TVD) 19. Directional Survey I 20. Depth where SSSV set I 21J Thickness of Permafrost· 9810'MD - 9268'TVD 9765'MD - 9226'T%EYES~ NODI 2944 feetMD . J 2010' DIL/BHCS/GR/SP, LDT/CNL/NGT/CAL, CBL/VDL/GR/CCL, .Gyroscopic survey :I23. CASING, LINER AND CEMENTING RECORD SETTING DEPTH MD CASING SIZE WT. PER FT. GRADE TOP. BOTTOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED 20 x 30 Insulat~ Conduct.~r Surface 110 36 8 cu.yds, concrete 13 3/8 72~ L-80 Surface 2495 17 1/2 3572 cu. ft. Pez~afr~st II 9 5/8 47~ L-80 Surface 8964 .12 1/4 1193 cu.ft. Class G; 67 cu. ft. Permaf~Dst C 7 26# L-80 8687 9810 8 1/2 390 cu. ft. Class G w/18% salt 24. Perforations open to Production (MD+TVD of Top and Bottom and 25. ~ .. TUBING RECORD interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD) 7"/5 1/2" 8592' 8592' ~/4 1/2" tai]pipe 8762' NOne 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. : : DEPTH INTERVAL (MD) AMOUNT& KIND OF MATERIAL USED · . . 27. pRODucTION TEST , Date First ProductiOn -~ I Method of Opera. ti.on (Flowing, gas lift, etc.) Date of Test Hours Tested PRODUCTION FOR OIL-BBL GAS-MCF WATER-BBL CHOKESlZE GAS-OIL RATIO . ....~ TEST PERIOD ~ .~i · FloW_Tubing Casing Pressure CALCULATED :.~ O.IL-BBL i::GAS-MCF WATER-BBL OIL GRAVITY-APl (corr) ~Press. " 24-HOUR RATE ~' I 28. coRE DATA -- Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips. · · Alaska 0il & Gas Cons, Anchorage = ; Form 10-407' Submit in duplicate Rev. 7-1-80 CONTINUED ON REVERSE SIDE 29. 30. , · GI~OLOGIC MARKERS FORMATION TESTS NAME Include interval tested, pressure data, all fluids recovered and gravity, MEAS. DEPTH TRUE VERT. DEPTH GOR, and time of each phase. Sag. R. Sst. 8994' 8426' Shublik 9026 ' 8457 ' Ivishak 9108' 8534 ' . \ 31. LIST OF ATTACHMENTS Well History, Well Logs and Directional SurveyS 32. I hereby certify that the foregoing is true and correct to the best of my knowledge . ¢2~ Title Date Signed R. i-~. He:]_ley .A ( ' INSTRUCTIONS General' This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Item 1' Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). Item 23' Attached supplemental records for this well should show the details of any multiple stage cement- lng and the location of the cementing tool. Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In- jection, Gas Injection, Shut-in, Other-explain. · Item 28' If no cores taken, indicate "none". WELL H-18 (14-15-i1'-13)~ PBU WELL HISTORY Spudded w~ll at 1730 hours December 23, 1982. Drilled 17 1/2" hole to 2510' Ran 63 jts. 13 3/8" 72# L-80 Buttress casing to 2495'. Cemented with 3572 cu. ft. Penmafrost II cement. Installed and tested BOPE. Cleaned out to 2454' tested casing to 3000 psi, okay. Drilled out to 2520' ran leak-off test to 0.70 psi/ft, gradient. Directionally drilled 12 1/4" hole t~ Ran 218 jts. 9 5/8" 47# L-80 Buttress casing to 8964'. ~ted in two stages: First stage with 1193 cu. ft. Class G cement; second stage through D.V. packer at 2430' with 67 cu. ft. Permafrost C cement preceded by Arctic Pack. Cleaned out D.V., tested casing to 3000 psi, okay. Cleaned out float equipmant and directionally drilled 8 1/2" hole to 9810'. Ran open hole logs. Ran 28 jts. 7" 26# L-80 IJ4S liner to 9810'. Cemented with 390 cu. ft. Class G cement with 18% salt. Cleaned out to 9765', tested liner to 3000 psi, okay. Changed well over to NaCl. 126 jts. 5 1 2_1_1_1_1_1_1_1_1_1~2~7# L-80 A/B Mod Buttress IPC tub'.zng with 4 1/2" tailpipe assembly to 8762'. Landed tubing with ball valve at 2944'. Installed and tested tree. Displaced tubing to diesel, set packer at 8592'. Tested tubing to 3500 psi, okay. Released rig at 1400 hours January 8, 1983. Ran gyroscopic survey, tested and secured well January 15, 1983. ,1.983 A!aska Oil & 6as Cons, Oo~nrr~issi,~ Anchorage spepp -sun January 19, 1983 Mr. Gary Plisc/a Sohio Alaska 'Petroleum Company Pouch 6-612 knchorage, Alaska 99502 Re: Our Boss Gyroscopic Survey Job No. Ak-BO-30006 Well: H-18 (Sec 21TllN R13E) PrudhoeBay Field North Slope, Alaska Survey Date: January 15, 1983 Operator-Samec CON'FJD£NT AL Please find enclos~ t~ "~ig~al" ~d siren (16) copies of o~ ~ss ~oscopic ~tishot D~ion~ ~ey on t~ ~ve well. ' Thank you for giving us this opportunity to be of service. Sincerely, NL SPERRY-SUN, INC. Kirk Afflerbach District Supervisor Ka/ka Enclosures /'lnnhora cons;2 :,PERRY-~UN WELL SURVEYING'-COMPANV ANCHORAGE ALASKA 'SOHIO ALASKA PETROLEUM COMPANY DATE:OF SURVEY dANUARY 15, BO... H-l,:-': (SEC'21 TllN R13E)' COMF'UTATION'"DATE .......................... ~-":"--' '-'C 'C'-S'~ F'RUDFIOE BAY ,.JANUARY 17, 1 '-),:,'"'-'.~, ALASKA , ; ................ ............................. VERTICAL SECTION CALCULATED ALONG CLOSURE.. TRUE' ...... :SUB-SEA COLIRSE .........F.:OLIRSE DOG-LEG MEASURED VERT I CAL VERT I CAL I NCL I NAT I ON' ri I REC:T I ON SEVER I TY DEPTH DEPTH , DEPTH BEG MIN DEUREE.:, DEG/100 0 0 00 '-' -Bu. "': 0 0 N 0 0 1 O0 100.00. 19.65 04~, = ~ ~,'?='. 10 200 ........... 199.99 119. 300 299.98 219.63 400 399.97 319.62 500 ..... 499.96 419.61 600 599.95 5i9.60 700 699.94 619.59 64 ................ 0 ..... 46 ................ S'-'22.10' 0 49 S 22.60 0 46 S 20.69 O' 49 ........ S'"28.'69 · 0 38 S 32.89 0 36 S 31.39 800 900 1000 1100 1200 1300 1400 1500 1600 1700 1800 1900 2000 2100 2200 2300 2400 2500 2600 2700 2800'' 2900 ......... 799 899 999 '1099 1199 '94 .......... 719 .94 819 .93 919 .93' "1019 .93 1119 .'59 ........... 030 .59 0 20 .58 0 27 .58 ' 0 24 ' .58 0 24 · S -33"60' S 38.69 S 57.60 S '46.39 S 46;10 1299.93 1219.58 1399,92 '1319.57 1499.92 1419.57 1599.92 I519.57 1699.92 ....... 161'9.57 1799.91 1719.56 1899.91 1819.56 1999.'71 ....... 1919.56 2099.91 2199.91 "2299.90 2399.90 2499.90 2599.82 2699.37 2798.47 2897.16 2019.56 2119.56 '2219.55 2319.55 2419.55 "2519.47 2619.02 2718.12 2816.81 0 0 0 0 -0-' 0 0 0 0 24 S 44.19 19. ..... c,' 41 ._::0 23 S 35.39 30 S 55.89 24 ...... S'-52. 0 24 S 55. 0 19 S 38.19 19 .... S 45.39 22 S 49.80 21 .S 54.19 0 17 S 76.69 0 28 S 69.60 3 52 '' N 65.80 6 58 N 43.19 8 18 N 41.89 10 8 N 44.50 E E 'E E E E E E E I-_- E E E E E E E E' E E E E E E E E E E E E 'PAGE .... 1983 0.00 O. 75 0.03 0.06 0.05 0.13 O. 20 0.04 dOB NUMBER AK-Bo-~O0o6 KELLY BU~HINu ELEV = 80 35 FT. ................ OPERATOR=SAMEC : - .................... . TOTAL .................. ............ ' .................................... REC:TAIqGULAR COORD I NATES VERT I L":.£' ' ~ NORTH/SOUTH EAST/WEST SECTIu., ) O. O0 O. 00 O. O0 0.60 S 0.26 E -0.03 1-. 83'"' .~ .......................... O'r;"77-i'E '~0';' 1"1 ........ 3.11 S 1.29 E -0.20 4 41 '~' . o 1.81 E -0.30 o.=' 68-'-S ........................ 2,"'40--"E-~ ............ -'-0'.-33-~ 6.78 S 3.05 · -0.23 7.70 S ~-' '"'" .-.o.-'E' ::::: :: -0.11 0 10 .......................... '"""= .... ,:,..., 1 .=, 4]-1-~-E .................. ~'--'0.-01'~ 9.10 S 4.57 E 0.12 9.55 S 5.09 E 0.39 ...... 10'. 01- S ................. 5 ;'69-E~~':--'0¥73---- 10.51 S '6.21 E : 0.98 11.01 S 6.71 E 1.2'. .... II; 49 S ................... 7';"15-E 0.17 0.18 0.10 O. 02 0.02 0.08 0.07 11.98 S O. 19 12.50 S 0.10 ......... -1'2;' 96 '"S ............ O. 02 13.38 S O. 13 13.80 S .... 0,05 ................... I-4 ;22-S 7.54 E 1.53 8.10 E 1.80 · 8;'73-E ..... 2¥I'7--- 9.30 · E 2.50 9.75 E 2.73 --'l'O';-'l'~mE ........... 2.8Er--- 0.06 O. 05 O. 08 O. 07 O. 20 3.54 3.72 1.34 1.89 14.67: S 15.03: S 15. ~- S 10.59 E 3.11 11.09 E 3.39 i'1'.-6'I--~ .... 3.-73---- 15.49 S 12.13 E 4.12 15.70 S 12.77 E 4.60 ....... 14.46'"S ............. 1'6'.24-E 8;27---- 8.65 S 23.48 E 17.32 1.16 N 32.47 E 29.70 12.82 N ........... 43.'47-E- .............. 44-70 ..... ........................................... :SPERRY'SUN WE'LL '"'SURVEYING ""COMPANY ............................................................................. '-""PAGE ....... ANCHORAAE ALASKA "'-I ':; '" ~ -' i' · =,LHIO ALA._I...A PETROLEUM 'COMPANY DATE OF ~LRVEY ,..IANUARY 15 1 .°.83 H--I:E: (SEC '":"1 ]'111'4 R13E) COMPUTATION DATE '" . .~. ' .............................................. BL-I.=,S EYROSC. OF"~E.] ' "'"' ' '"' ..... .'5'JIRVEYI PRUDHOE BAY ' dANUARY ALASKA . V~RTICAL SECTION CALCULATED ALONG C.'LOSURE 17, MEASURED DEPTH TRLE "' '- ............. ...',LIB-;~EA C:OURSE VERT I CAL VERT I CAL I NCL I NAT I ON DEPTH DEPTH DEG MIN COLIRSE D I RECT I ON DEGREES 1o''''-'..,=,.=, dOB NUMBER AK-BO-30006 KELLY BUSHING ELEV. = OPERATOR=SAMEC .: ] : . · DOG=LEG TOTAL .=,EVERITY RECTANGULAR COORBINATES BEG/1 O0 NORTH/SOUTH EAST/WEST 80. ~5 FT. VERT I CA!_.. .) 3000 3100 3200 3300 3400 3500 3600 3700 3800 3900 4000 4100 4200 4300 '4400 4500 4600 4700 4800 4.900 5000 5100 5200 5300 5400 5500 5600 5700 5800 5..000 2.995.43 '-""~ =: ~.. 1 08 11 .~n~ 21 301 '~ 86 12 31.90-31 .................. 310~.'~76 14 o-:oo. 47 '--'~' o~06.12 17 · .:, ~ o J.. 2/:., '-"--' · =,.:,00. .91 1.9 · 34.74.30 ...... =: .... ;":" ~5 '='":' 3565.96 ._',-~,~,~'~°~. 61 24 3/_',57.21 3~7A _ _ .o6 24 .... :.-:748 .48 . ,:,66o. 13 24 3839.,~,'::'='~ 3759.47 ~,.'~'q 3931 '='9 '-,,-,= ' .~.. ,:.,:,._,0.94 23 4022 .... "' . oo c,; -, ..". 46: """' 4114 c: ~ 40._-', 4 0:3 '-"":' 4205, '-.?:"4. _ 41 ..'"='~'._,. 57 4297.40 4217 ~'~ '=";' '="-' R '" '-"] R :3 A - · _,o,_. 71 ,,,~,.._ . _ ~4 447'..-7,,'.."=:'=_4':"--~'--~._....., 46 24 4570.87 44.90. ,. _.._5"'. Z4- 4 :,6..-. "-' . Oo 4..,,:, ! 73 24 4753.44 4673.0.9 ~._~ .... 4844. :=:7 .... 4764. ,.~'='.. :7.'=:'' 4.936. '--'. ':~ 4855. o.-, .')..:, ,.,U.~7.75 4947.40 23 511'-.?. 31 ~'""~'"' ,_ · .. u ¢ ,:,..'.26 2'"4 5°10 77 5130.42 ...-4"-' 5301 06 5.:,c, 1 · . ._ ,:...-.., 51 Z4 ~ :"4 c;, .-., =' .-, ._ %] _ ..'.J .... · ' ~Z .,... 1/', '-'~" · :; '-"-' ' - ':.'5 · . 4,:, ..'. b'::: 5402.48 5572 '-":* =" "'-' . ,:,; ,.,4 Y..'. 54 "'=' .~,.J 5662.67 ~:":": ..... ' 26 12 N 46.89 E 55 'N 48. 0 E · 40 'N' 48."19 E 7 N 50.50 E 59 N 50.30 E ' 57 ....... N '50.8.'.";'E 10 N52, OE 6 N 52.50 E 7 ...... N 52.39 E 54 N 52. 0 E 45 N 52..'=:0 E 43 N 52.39 E 43 N 52.6'.:.) E N._~'":'.... 60 E 56 N 54. 0 E 11 N 54.10 E 30 N 54.80 E 20 N 55.60 E 4 N 55.10 E 53 N 54.80 E 53 ' N 54.8C) E 55 N 54.80 E 45 N 55.30 E 3.9 N 5= · _...,, 10 E 2 N 55.:37 E 42 N 55. 0 E 13 N 54.6';? E 37 N .54.6(:) E 53 N !54, 80 E 21 N 54.80 E 2.87 · -., ,:/,-., ~-· .': '-, , .~', (.) (] .-,"r~ O. 04 0.27 (-) .-,(- . ..' .) 0.04 0.1~_':' 0....'"4/-.. ('~. 26 ,h. 2~ 0.42 0.37 0. :34 0.21 0.00 0.02 0.26 (') 1 0.6? 0.5:3 0.40 0.29 0.46 73.60 N i10·69 E 13'1.75 93.88 N 135.21 E 162.67 7¥I 1 N .................. I'63,'50-'E"~--, .... 1'~8.-28 ...... 42.02 N 194,78 E 237·30 67,06 N 227.12 E 277.35 1,".96 ' N ............ '":"="'"' ~ '""'--- ........ '"" 7*:38 ....... 216.91 N 241.70 N 266.29 N 290.76 N 314.89 N 338.75 N 362.69 N 386.66 N 410.25 N 433.56 N 456..91 N 4.80. --'6 N 503.62 N 526.78 N 549.73 N 572.77 N 596.3:3 N 620.63 N" /_-.45.4,/=. N 670.58 N 695.96 N 291 . 68 E 357.22 323.58 E 3.96.76 ......... 355, 46-E 387.40 E 475./...)2 41.9.5.9 E 515.13 452.20 E ~,~ 4 )- 485.21 E 5.95.06 518.75 E 635.71 552.70 "E ....... 676 :'56 586,43 E 717·09 61.9.71 E 757· 23 '652.81 E 685.~3 E 837.23 71.9.0/=. E 877.16 ...... 752.0B-'E- .............. 916:89 ...... 785.30 E 956·85 81.9.1.9 E .9.97.63 853.70 'E ............ I03~' 30 .... 888.71 E I081,65 .924.18 E 1124.54 960.17 E 'I168.0I SOHIO ALASKA PETROLEUM COMPANY H-18 (SEC 21 TIiN R13E) .................. COMPUTATION DATE PRUDHOE BAY dANUARY 17, 1783 ALASKA VERTICAL SECTION CALCULATED ALONG CLOSURE ~ TRUE SUB-SEA~ MEASURED VERTICAL VERTICAL DEPTH DEPTH DEPTH 6000 5752.26 5671.71 6100 5841.78 5761.43 6200 5731,28 ..... 5850.?3 6300 6020.87 5940.52 6400 6110.59 6030.23 6500 ...... 6200,41 .... 6120.06 6600 6290.44 6210.09 6700 6380.69 6300.34 6800 6471.22" 63?0,87 6900 6562.05 6481.70 7000 6653.03 6572.68 7].00 6744.31 6663.'96 7200 6836.06 6755.71 7300 6928.19 6847.84 7400 7020r75 .... 6940.3? 7500 7113.73 7033.37 7600 7207.09 7126..74 7700 '7300.58 7220.23 7800 7394.00 7313.65 7900 7487.35 7407.00 8000 -7580.65 7500,30 8100 7673.88 7593.53 8200 7766.87 '7686.52 8300 785?,86 7777.51' 8400 7953.04 7872.6? 8500 8046.29 7965.94 8600 8139 43 '-" ~" 8700 8232.41 8152.06 8800 8325.49 8245.14 8900 8418.83 8338.48 SPERRY=SUN,,-WELL--SURVEYiNGCOMPANy~ ........................................ ANCHORAGE ALASKA COURSE COURSE INCLINATION DIRECTION DEG MIN DEGREES 26 31 . 26 ...... 27 26 23 N 54.80 N 54.89 N 55,19' 26 17 N 55.10 26 8 N 55.89 25 "59 N 57.30 25 37 N 58. 0 25 '"~ ". . ~ N 58 6'~ 24 -'52 ...... N '57,50 24 34 N 60.39 24 2:': N 60.89 N ~1.10 N 61.69 N 62.30 N' 62.69 N 63.19 N 64.69 N 66.10 N ~8.80 N 72.39 N 77, 60 N 79.80 N 81.1'~ N 81.50 N 81.60 N 82.60 N 8:3,'50 No""'-'o. 89 N 86.19 N 88.50 23 43 23 8 22 36 21 52 21 18 20 40 20 54 ..... 20 53 21 7 21 4 21 19 21 49 21 17 21 14 21 6 35- 35 18 45 E E E E E E E E E E E E E E E E E E E E E 21 21 21 20 DOG-LEG SEVERITY BEG/lO0 DATE OF SURVEY dANUARY 15~ 1983 BOSS'GYROSCOP'IC'"'SURVE~ ......................................... dOB NUMBER AK-BO-30006 KELLY BUSHING ELEV. = 80.35 FT. OPERATOR=SAMEC TOTAL RECTANGULAR COORDINATES ' VERTICP NORTH/SOLITH EAST/WEST SECTI~,) .04 721.58 N 996.47 E~ 1211.87 .13 747.23 N 1032.91E 1255.85 ."15 ............. 772.'78'N ............... 1069.'47-E ............ :'"-1297;'71 .......... .18 778.17 N 1105.92 E 1343.81 .38 823.19 N 1142.33 E 1387.49 .63 .......... 847';"37'"N ............ I'1'79.01'-E', ................. 1'43I~06 ............ .47 870.67 N 1215.7~ E: , 1474.33 .3? 893.27 N 1252.45 E 1517.18 61 .............P'l="'OS-'N ............. 128~',-'8_9-'E--' ........ 155~';'50 ....... I .iI l~ . . . 0 0 0 0 0 0 0 0 0 0.49 0.23 0.76 0.62 0.59 O. 75 0.60 0.84 O. 55 O. 96 1.31 I. 87 0.84. 0.72 0.52 O. 09 0.38 O. 58 0.15 0.89 1. O0 936.03 iq 1325.09 E 1601.22 956.38 N 1361.27 E 1642.66 ':776 ,- 17- N ............ 1::~P6'. '?8-E ................. 1'683':' 4~ ..... 995.21 N 14:B1.90 E 1723.16 1013.47 N 1466.23 E ~' 1762.0~ 1030,'95' N .......... ~"' '" ................. ' .. 147~.oI E I77~.c ---" 1047.69 Iq 1532.58 E 1063.4'2 N 1564.76 E 1078~'17'N ........ 1597.03--'E-- 1071,87 N 1629.97 E 1103.77 N 1663.77 E '1113."08 N ......... 1698.50-E 1120.16 N 1733.76 E 1126.22 N 1770.23 E '-11'31~'76"'N ...... ]806'.'5~-E-- 1137.09 N 1842.4~ E' 1142.05 N 1878.26 E II'46,"46~N .......... 1150.47 Iq 1950.97 E 1153.65 N 1987.40 E 1155.'32 N 1836.65 1872.47 I'W07¥95 .... 1943.55 20I-~'~~ ~49.43 2084.69 21IW¥80-- 2154.40 2188.74 2257.80 2271.~3 2023.24"'E .......... ~-232'4'.88 oF ERRY-..,UN 'WIELL'"SURVEY I N 5 L. LIMF ANY' P~GE .... 4 ......... ANCHORAGE ALASKA DATE OF SURVEY ~IANUARY 15, 19~'-' ......... COMPUTATION DATE BOSS"'GYROSCOP'IC"SURVE¥ dANLIARY 17, 1983 dOB NUMBER AK-BO-30006 KELLY BUSHING ELEV. = 80.35 FT. OPERA'TOR=SAMEC SOHIO ALASKA PETROLEUM COMPANY H-18 (SEC 21 'TllN R13E) ...... PRUD'HOE BAY ALASKA VERTICAL SECTION CALCULATED ALONG L. LUc.,LRE : ' '-' '-" ' ..... i ~- ............ TRUE ~,UB-._,EA L.U.IRoE L. UUR~,E"' ~" ........................................................... DOU-LEG "TO'TAL- ............. MEASURED VERTICAL VERTIC:AL INC:LINATION DIREC:]'ICIN ._EVERITY REL.] AN_,LILAR COORDINATES VERTICP DEPTH DEPTH DEPTH DEG M I N [ EUREE~ DEG/lC~0 NORTH/SOUTH EAST/WEST SECTI · - ~' ' 63 '" ~'-' ''* ":' :=' 1 ? 48 N '*?0. 0 E ?000 ~:51 ~.. ,~, .~.-, ,~ ~',, .,.-,,- 9. 100 8606.04 8526 ,48 17 .,:..:, N ,... . .:, :..' IS . ¢:'""' ~" '"' 2('~ 1 N ,=,o :::9 'E ... ~(..x.) ' 8700.' 9:=:" ,:,6-.."(..~-/":' ......... ,,, '",.,~ . . . · . , i~1 ,. ii '?300 .-,~o,~ :~- ,:,. :. ~. _o :_-':714. ~' _ .. ._ u 20 16 S :~. 50 'P 4 0 0 '-"-' '--' '~' 4.3 '::"'-" ':" - c,,:, U,:,. 0 7 2.: 1 2 '" ':":' 10 ,--,'~.,,.~, ~ ,, 0 ,.,,_,, '.~500 .... :-:: ,~ :_-': 1.48L=:'F~O ~, 1 '-.-'.'21 ..,._,~-~-' ..... ~=,-' S7,37 I~ ' ' · . .~ o~ ,-,'60,L~ ~c],74. 11 .8','273.76 2.:-'," 20 S o5.60 9700 ,.9166 50, ' ' '-' . ~oc,6.15 22 .:,'""":'o. S ,=.4"" . ,=,'":' '0 ; ,=,0u 7258-, 7;=' '**]178.44 ....... }.:Z ........ ~:.f, ............. ~:,'= ...... o4" '--"-'. ,=,0~ .. ,:. 10 "*"-'. ' '-' "'--' ")'-'.' ~..oo. 0~ ? 187.67 ~ .:,'"'-'*'o ~:,=' o'-'4. ,:,u'-~' ' : 1.08 1155.79 2057.88 E : 2356, 23 0.46 1 i 55, ?/.4 N 2091.42 E . 238~, 45 0 64 ............ ~5/- .... ~.'~ .... N ................ '-' ""~ .......... ~ 1 -..'-..,. 14-'E" -24-I'6": ..'R'2 ....... 0.45 1156.34 N 2157.57 E 2447.90 .. 0.9. 1 11 ~,-~-~,. 5.9 N='--' 1 ?4.85 E 247~. .27 0. e':'.. ~ ...... 1154'";]'5"-N ..... :--'--223I';'44-E 0.80 1151.85 N 2269.03 E ' 2544.82 0 44 114.=..64 N . ~<.,,. 16: E . 2577.1~ 0. O0 ........... z*' ~'*%"~'~-~". z~, ~ .... ~4'R'""~'*~ . ~ z ~ ~0-,-~ 0.00 1144.~1 NR 2849.35 E 2613.4~ HORIZONTAL'-DISPLACEMENT' = .... 2613'. 43 FEET AT NORTH 64 [lEG. ' ...... I ..... MIN"g-":'EAST--AT-MD-~- ...... .9810 THE CALCULATION PROCEDURES ARE BASED ON THE USE OF THREE DIMENSIONAL RADIUS OF CURVATURE :METHOD. oPERRY-~:,UN WELL 'SURVEYING COMPANY ...... ~ ........................................... , ................................... PAGe'5 .... ANCHORAGE ALA,=,KA SOHIO ALASKA PETROLEUM C:OMPANY .14_1° - ,., (SEC 21 TI'IN'R13E) COMPUTATION DATE ....... F'RUDHOE BAY ,,.IANLIARY i 7, 1 o ,., .-,. ,=, o ALASKA DATE OF SURVEY JANUARY 15, 1983 dOB NUMBER AK-BO-30006 KELLY BUSHING ELEV. = 80.95 FT. ................... OPERATOR~SAMEC ........................................................... VALLEo FOR EVEN 1000 FEET OF MEA._URED DEPTH I NTERF'OLATED ' ~-'-' '=; ]'RUE SLID-SEA TOTAL MEASLIRED VERT I CAL VERT I CAL REC:TANr4ULAR COORD I NATES MD-TVD VERT I CAL DEPTH ......... DEPTH ....... ' DEPTH NORTH/SOUTH ........ EAST/WEST DIFFERENCE .............. CORRECTION 0 0.00 -80..",'""'=-._, 1000 ......... 999.'93 ..........919.'58 2000 3000 4000 5000 6000 7000 8000 9000 1999.91 I919.56 2995.43 '2915.08 '3931.29 3850.94 4844.87 4764.52 5752.26 5671.91 '6653~03 ...... 6572.68 7580.65 7500.30 8512.63 8432.28 0.00 0.00 ...... 9,'55"S .................... 5.09 E 14.22 S 10.13 E 25.75 N 56.74 E 241.70"N 323.58 E 480.26 N 652.81E 721.58 N ?96.47 E 956.'38'"N .... 1361.27 E 1113.08 N 1698.50 E 1155.79 N 2057.88 E O. O0 ...... 0 ~ 07 .......................... 0.07 .................................................. 0.09 O. 02 4.57 4.48 68 ~'71 ................................ 64]-I'8 .............. 155.1:3 86.42 247.74 92.61 ,.'~ 4/_,. 97 ..... 99; '23 419.35 72.38 487.37 66:. 02 541.98 .......................... 54'.'61' THE CALCULA]'ION PROCEDURES ARE BASED ON THE USE OF THREE DIMENSIONAL RADIUS OF CURVATURE METHOD. ) ') · _-,uHIO ALASKA PETROLELIM L. uMFANY H-18 (SEC~ ~1 ]'1-lN"-IR13E) PRLIDHOE BAY ALAoKA ............................................ SPERRY:-$UN WEt:L'-"SURVEYING COMPANY : PAOE ..... 6- ANCHI]RAGE ALAoKA DATE OF" ' ~URVEY dANUARy 15, 1983 ................... COMF'I"JTATION DATE dANUARY 17~ -.-. oc, dOB NUMBER AK-BO-30006 KELLY BUSHING ELEV. = 80 ~5 FT OPERATOR-=.SAMEC- ............... INTERPOLATED VALLE~ FOR EVEN: 1£)0 FEET OF ':' '" ' ...,UB-~.,EA DEPTH ' "i '~ '" ] R JE TnTAL ..,LIB-oEA VERT I CAL VERTICAL RECTANGLILAR ROORD I NATES MD-TVD VERT I CAL 'DEPTH ............ DEF']'H ~ ' ' NDR] H/::.OLITH EAST/WEST DIFFERENCE ................ CORRECTI LIN MEASLIRED DEPTH 0 80 180 280 380 480 580 680 780 880 :-?80 1080 1180 1280 1380 1480 '1580 1680 1780 Om 80. 180. 280. 380. 480. 580. 680 '. 780. 880. 980. 1080. 1180. 1280, 1380. 1480. 1580. 1680. 1780. O0 -80.35 35 ........0.00- 35 100,00 35 200.00 35 300.00 35 400.00 0.00 0.37' 1.58 2.85 4.'16 5.43 35 35" 35 35 35 35 35 35 35 35 35 35 35 500.00 6.6C) 600'00. '. ..... 7 . ..,:.~o 700. O0 ,:,'-'. :37 800.00 ~00.00 1000.00 1100.00 1200.00 1300.00 0.00 "~. ...... 0.16 E S 0.67 E S 1.1 '? E · :, 1.72 E 'S '2.26 E · :. ~... E S 4.05 E 9 01 '-' . .. c, 4 4'? E 9 47 '~ 4.96 E , m '~ '~ 92 ~ ..,~ 59 E 10.41 S 6.11 E 10 Ol ~ .'~' ... 11.40 8 7.08 E 11 87 . ~ 7.46 E 12.41- S 7.~6 E 12.88 S 8.63 E 13.30 ~ '~.18 E ......... 1400.00 1500.00 1600.00 '1700.00 O. 00 0.00 .......... 0, O0 ................................... : 0-01 0.01 O. 02 O. 01 0.'03 0.'01 0.04 0.01 Om O. O. O. O. O. O. O. O. O. O. O. 05 O. O1 06 ................... O-TO 1 ........................................................ 06 O. O0 06 0. O0 07 0,'00 07 O. O0 07 . O. 00 07 ................... 0200 .................................... " ..... 08 0.00 08 0.00 08 ................ 0.'00 08 0.00 09 0.00 ANCHORAGE ALASKA SOHIO ALASKA PETROLEUM COMPANY H,18 (SEC 21 TllN~ R13E)' COMPUTATION BATE PRUDHOE BAY dANUARY 17, 1983 ALASKA MEASURED DEPTH 1880 1980 2080 2180 .2280 2380 2480 2580 2680 2781 2882 2984 oF ERRY ~,LIN WELL SURVEYINL~ COMPANY PAGE 7 DATE OF SURVEY ~IANUARY 15, 1983 JOB NUMBER AK-BO-30006 KELLY BUSHING ELEV. = 80.85 FT. OPERATOR-SAMEL~ ........... ' 100 FEET OF ..~IJB-~EA DEPTH ' INTERPOLATED VALLIES FOR EVEN SUB-SEA TOTAL VERT I CAL REE. TAN~ULAR ............. DEPTH ..... NORTH/SOUTH 13.71S 14.14'S 14.55 S 14.~6 S '15.28"S 15.47 8 15.64 S 14.94'S 10.23 S 0.81S 10.68 N 23.71N 37.90 N 54.06 N 72.40 N 93.67 N '118.72 N 145.99 N 173.36 N ]'RUE VERTICAL DEPTH" oo,.,. 35 1 '--' ' ' ,:,0 U. 00 1980.35 .... 1900.00: 2080' 35 2000. O0 2180.35 2100. O0 2280.35 2200" O0 2380.35 2300. O0 2480.35 2400. O0 2580 · 35 2500 · O0 2680.35 ,2600. O0 2780.35 2700.00 2880.35 .... 2800.00' 2980.35 2900. O0 - o189 ...... 3180'. 35 3000.00 35 3100.00 35 3200.00 35 3300.00 -35 3400.O0 35 3500..00 35 3600.00 3399 3380. 3506 .... 3480. 3615 3580. 3725, 3680. COORDINATES EA..,T/WE..T 9.69 E 10-05 E 10.49 E 10.99 E 11.51E 12.04 IE 12.62 E ........ 15.15E 21.93 E 30.70 E r 41.36 E 54.56 E 69.96. E ...... 87.95 E 109.24 E 134.96 E 165.49 E 199.87 E 235.33 E M D- T VD VERTI ';.'AL '!" D I FFERENCE .............. C:ORREt3T'I'ON ........ : ................... i O. 09 O. O0 0.0'B : ..... 0 ~"00 ........ : ............. ~ .............................. " O. 09 O. O0 0.0'.-? O. 00 O. 10 Cr~-O0' · O. 10 0:,00 : O. 10 ,0.00 0.15 ..................... Cr~'05 .... -'-" 0.51 O. 36 1.34 0.83 2.57 ............................... --1-;23 ............................................ -- ..... 4.28 .1.71 6.46 2.18 '~..-.=' .......................... ---' .->_.....~..-~ ~.-- . ,,,=,._1 ~ · 0 .. ' 1 ._-:....5 3.90 1" 8.69 5.44 .....,,S,~-*' ",.-' ,,:. "') '")' ....................................... 7. '~"'~ '-~=- 43 9.21 45.00 9.58 ...PERRY-,. UN WELL' SURVEYING' COMPANY ...... ANCHORAGE ALASKA · -',uHI.o ALASKA PE]'ROLELIML. oMPANY-" ' · '" H-18 (S;EC .21 T11N RI'3E) ~ ................. COMPUTATION DATE F'RUDHOE BAY ,JANUARY i7, 1'-'"'-' ALASKA , , ~-[ I NTERFLLATED VALUES FOR EVEN lO0 FEET OF ':' ':' ..UB-..EA: DEPTH ]'RUE ._'~1..~-':'~: z~.. ~. ~. n TOTAL MEA~.LIRED VERTICAL VERT I CAL RECTANGULAR L. OURD INATE.:. DEPTH DEPTH .......... DEPTH NORTH/SOUTH .............. EA~.]: c''/WE._.T-~' 37e]0"..:,'"='...,'",:,700'", 00 200" 67 N · 3880~'35 .......... 3800.00 .... 227..97 3.980.35 3.900.00 254...90 4080.35 4000.00 281.70 · 4180.'35 14100'.00 ....... 308.22 4280.35 4200.00 334.31 '3834 3.944. 4053 4162 4272 4381 4380.35 4300.00' '4480,'35 ............ 4400,00 4580.35 4500.00 '4600.00 ...... 4700,00 4880.35 4800,00 4.980.35 4.900.00 '5080,'35 5000,00 5180,35 5100.00 5280.35 5200.00 '5380.35 ......... 5300.'00 5480.35 5400.00 5580.35 5500.00 I',i N N N I',! 360.4.9 N 386,80 N 412.68 N 438.23 N 463.78 N 48.9.33 N 5.1.4.87 N 539..96- N 565.07 N 5.90.65 N 617; 32-N 644.77 N 672.66 N 44.90 4600 4710 4820 4680.35 4.92.9 ......4780:35 270.83 E '305.84E 340.66 E 375.51.E '410.55 446.08 482.17 518.95 556.24 5.93.12 62.9.45 665.66 701..90 738.08 774.13 811.08 '84.9.02 887.74 .927.14 DATE OF .,URVEY ~ANUARY 15, 1.983 dOB NLIMBER AK-BO-30006 KELLY BUSHING ELEV. = 80.35 FT. OPERATOR-SAMEC- - · E 'E E E E E E E E E E E E . MD-TVD VERT I CAL D I FFERENCE- ............ 1..;C. RRECTi UN 54.57 9.57 ':':' : ......... ;63 ~'9.9 :9'~"'4 i 73.~:...,'"'= .9.26 '-]'" 4 :-': 9.24 .. 1.71 .9. 101.00 9'29:. 110.49 9·49 ':. :... · _-,0.05 9. 13.9.66 9.61 ·" 1'49-.--08 ................................ 9"'42 158.46 9.~.~ ~" 167 '"=' 9.3.9 . 1 :::6.34 9.23 "S..97 1 :~ .9.63 - ~06 .'~.,0 ...................... I0:23 216..90 10.70 227..94 11.04 5038 5148 o.'- 57" 5476 ' 5586 5697 5808 _ SOHIO ALASKA PETROLEUM COMPANY H-18"(SEC 21'TI'1N R13E) PRUDHOE BAY ALASKA SPERRY'SUN WELL' .qURVEYIN~]"~]OMPANY- ANf":HORAGE ALA._-q,A I]ATE: OF SURVEY ,JANUARY ...................... COMPUTATI OIq DATE ,JANUARY . 17, ': '-"-' 1 ..,'o._-, ,..lOB NUMBER AK-BO-30006 KELLY BI_IoHING ELEV. = . .................................................... OPERATOR=S-AMEC ] RUE SLID-SEA TOTAL MEASLIRED VERT I CAL VERT I CAL REC.TANGULAR C.00RD I NATES: ......... $~", ~ ................. ~,-. ~. ~.-. DEPTH 1]EPTH DEPTH I~iORTHT~. JLITH EA~T/WEoT 5919 6031 6143 6254 6366 6477 6588~ 66.99' 6810 6920 7030 '7139 7248 7356 7464 7571 5680.35 5780.35 5880.35 5980.35 6080:35 6180.35 6280.35 6380."35 INTERPOLATED I "' FOR EVEN I OF SUB-SEA DEPTH VALLE~ O0 FEET 5600.00 701 01 N 967 · I ......... 5700,00 7 z."-;~. 61 N 1 u 07. '",:. 7 5800 O0 ~='" . ~._-=,. ~ Y7 N 1048.65 N t [-s,-, 50 N ...... ~ 1130, 04 N 1170.78 N 1211.68 1. ,,' ..I ..' . ..D 1 917 c,-- .-.,,~ .-., · .~._'~ N 1~.~.. 54 ~40.16 N z~'~'"'"oo,. 37 .~6--. '43' N'' 1372.14 .9~. ~.., N 1410 . ~'~=._, 1004.16 N 1448.55 ........~ n.-,:~...... 49' N ........... 148..,.-'~ 37 ' ~ 1041.._q'--.'.~ N 1 ._, ... ~='-"]. 96. 1059.11 N 1. 555.64 ........ 1075,06, "N ............ I589. ?6 1089.99 N 1625.11 1102.95 N 1661.1~ 5900,00 786.71 -6000'00 ' 814'.87 6100.00 842.0~ 6200.00 868.11 6300.00 893.'1~ 64,:,0.35 6400.00 6,.,,.,u. 35 6500.00 66o0. L~5 ...... 6600"'00 6700.00 6800.00 6900.00 7000.00 7100.00 7200;00 7300.00 7400.00 E E E E E E E E E E E E E E E E E E E 6780.35 6880.35 ..... 6980.35 7080..35 7180.35 7280,35 7380.35 7480.35 7678 7785 7892 'PAGE--¢ 1983 80.3~ FT. MD-TVD VERTICAL DIFFERENCE'---~OORRE~TI'ON 239.381- 11.44 251";'01 262.75 11.74 274.45 11.70 285d'97 ................................ I'I]'52 297.33 11.36 308.46 11..13 319.28 .................................... 329.71 10.44 339.77 10.06 349.67 9'790 359.02 9.34 367.80 8.79 376,1I ..................................... 8~30 383.82 7.71 391.07 7.25 398,00 ....................... 6';"~3 405.04 7,05 412.14 7.10 ), .. PERRV-,. UN WELL ~.-~~IRVEVING COMPANV ................... ::- .................................. :~'}T'.~ .......... ~lT~E"~][.-O , . i ANCHORAUE'ALASKA '. :_-';OHIO ALASKA I~E]'ROLEUM 'COMPANY H-18 ('SEC: 21 TI'IN'' '~- RI..:,E) ; ..... . ':' ...... COMPUTATION' DATE I-RJDHUE BAY ,JANUARY ,1.7, ~':"-~'-' ALASKA SURVEY dANUARY 15, 1983 dOB NUMBER AK-BO-30006 KELLY BUSHING ELEV. = 80.35 FT. OPERATOR=SAMEC'-~ INTERPOLATED VALUES FOR .EVEN 100 FEET OF SUB-SEA': DEPTH: TRLIE ~.LIB-:.~EA TOTAL MEASURED VERT I CAL VERT I CAL RECTANGULAR COORS I NATES; MD-TVS VERT I CAL DEPTH DEPTH DEPTH .... NORTH/~.UUTH ..... - ...... EAc, T/WE~T ......D I FFERENCE- =--"-C'C~RRECTI'ON , 7'~9Q 7580. '~'= '" ''= .... · .',,., 7500. O0 111 ~ .0.., '.'3106 ............ 7680, 35 ......... ....... 7600."00 .................... 1 .z," 1 ~. u. '6':I' 7780.35 7700.00 1127.05 7880.35 7800.00 1132.~4 7~80.35 ...... 7?00.00 1138.~4 8080.35 8000.00 1143.'75 81~,0.35 8100 O0 ~1148 '~R N N 1775.57 E 434.18 7.58 1814.50 E 441.64 7.47 1852.9~'E ........... 4'48,95 ........................... ~;'30' 1891.30 E 456.16 1930.4~ E 463.66 1767.8I'E 471';'"I'~ 7;'54' 2008.66 E 478.50 7.31 2046.26 E 485.34 6.84 N ...... 2082.10"'E. ' Iq 2117.63 E N 2154.23 E 155';'70---N .......... 21 '.;, 1.75 E 154.17 N 2230. ~'F/ E 2271.5';? E ,c. 12. ~2 E 2349.35 E 491.57 ........................... .'6;23 ............................... 4?7.70 6.13 504.1.9 6.4.9 511.00"- :'-: .................. '6;-81 518.44 7.44 526.40 7..96 ,. c,~, 66 ......................... 541..98 7.32 8280:;'35 ............ 8200.'00 .............11'52.42 8380.35 8300.00 1154.~3 8480.35 8400.00 1155.7.9 8580;35 ....... 8500.00 1155,86' 8680.35 8600.00 1156.23 8780~35 8700.00 1156.37 8214 8321 ,842.9 8536 8644 8751' 8858 '8.965 .... .9071 7178 D284 ~3~1 .9498 ?606 9715 9810 8880-35 8800.00 '1 8.980.35 8?00.00 1 .9080.35 '.9000.00 1151.65 N .9180.35 ....... 9100.00 71148;12 N .... .9268.02 9187.67 1144.81N THE CALCULATION PROCEDURES :~ U._E-'A LINEAR INTERF'OLATION BETWEEN THE NEAREST 20 FOOT MD (FROM RADI; '-' Jo OF CURVATURE) F'OINTS Sohio Alaska Petroleum Company Our Boss Gyroscopic Survey Job No. Ak-BO-30006 Well: H-18 (Sec 21TllN R13E) Prudhoe Bay Field North Slope, Alaska Survey Date: January 15, 1983 Operator-Samec Scale: 1" = 500' -50~3. O0 TRUE NORTH -1000. O0 . '_ 500'. O0 ~00[. o0 150[. O0 200[. O0 Surface Location 700SNL 1735.~L Sec 21 TllN R13E --500. oo .. HOF~IZONTAL PF~O'JECT I ON GREAT D R;;CT;ONA DR;;. ING NC. REPORT OF SUB.SURFACE DIRECTIONAL SURVEY SOHIO COMPANY H-18 WELL NAME -, PRUDHOE BAY, ALASKA LOCATION AL1282D39 SINGLE SHOT 12-29-82 JOB NUMBER LYNN HENSLEY NAME TYPE SURVEy': .... _),,..../ .... .... ..¥ DATE ' i / '"" ' '~;" ENGINEER / · ~ /.~";-., ~_,.~,--~.~ TITLE ' S-I ~A-TU R E 2503 8982 DEPTH INTERNAL FROM TO TH~.$ IS A RECORD OF A SUB-SURFACE SURVEY OF YOUR WELL We have retained a copy of your survey report in our files for your convenience; however, should you so desire, all copies of the survey report will be forwarded to you on written request. All surveys are kept in a locked file and are held in strictest confi- dence. Additional cc~pies of your survey report can be made from the original by any blueprint company. GREATL. ANI] DIRECTIONAL DRILLING COMPLETION REPORT .:AMPUTED ON 1-- :3 -- :E: :3 IJ'.::~ING RARtUS OF CURVATURE TECHNIQUE :'RF~P't SURVEY DATA 'I"AKEN 12-:31-R2 .... Z NAL f":LIT.:;I lIRE D I RECT i ON N ?,/-, ':":' E :5; t' r4E'iLE :::;Hf"~T F:;IJRVEY RECORD OF "".=,LI""RVEY- (WELL A'.;:;'.EaJMED VERT tF:AL 'T'O .... ...._,L o'"" ],'-'. 0) S OH i fi S r-I hi I r3 H--i 8 :'tF: AS [iR I FT -f'RUVERT ::;UBF-;E(-./ 5:;Ef':T I FiN OEP-FH FiG MN f.'_~EF']"H DEPTH f' 1.:,] 0 0 0 0 (')0 '-:( "-"% · -c .) C) cio · .#.( *. ~l . . D I' REf-:"f' I ON RELA T I VE cFIr3RD T NATE'.:::; ANGLE FROM WELL.-HEA1"I 0.0c) ,::). 00 0.00 CLOSURE DIS-f'ANCE DG MN S 0.00 0 0 0 d e _~ / 1 c]) 0. (":, (')() ~,_,0..:, () 0 2 PiO 5: C) 0 2 4 2 2 F ~-' O. 00 O. ()0 0. (")() O. 00 (':~. 0 0 0 0 0 c'-). 0 0 0 ':2597 3 o 2596.96 2516.61 '-' C- ".:'/- ':::'"" 2e,',:::'9 6 ..:, J ........... /:,:3 2/:-,(xB. 2:.2: 2'7:E',2 7 i 5 2780.96 2700.6i ...":":"~7/", ..... 9 :':: (") '-'""..-,z, .... 7 ,z,'. '"Y._,"" 2'79:3.60 2'ii) 6'7 i C) 0 '::' 9/:, :q 6:7 ":,,:,,", ':, 9 s:; :3 () 5 8 i 1:2:~'-) :'3(")5:3. 05: 2 9-/2./:,:.2: :':: i 5 ]. 12:3 (i 5:14 4.0 0 :7::("16:2i:. 6 5 :._::2 41 :l 5 i 5 :32:2', 1. :7:: 7 :2:151. (")2 :73 :':', 7 1 '7 4 5 :B :3'2:7::. 41 :7:: 2 45:. (-) 6 :34 :'-2: ::;: 2 0 0 :':: 4 0 9 ....... 51 ":' ':' .....":":). 16 5:5 2 (") 2:2: 0 :7:: 4 9 5. 1 (") :21:414.7 5 :':','? 61 2/1- :21', c):3 ? 15.6:-2', :3 L-,:35. :3:3 4 c),/_-,'!?2 4 0 :39 9 6.5 (i :7:: 916. 1:5 .-i ,12,"I '-i '%;' 4 4:38 2 4:30 4:3:7:: 2 9 4 4 ..-._ ..- .... :.~ 484 i 24:7:x-i_ 4.6"~.>'P ./-,/-,.. _ 4619 . ._,":' 1 i..~..,-,i I,-1 .... ..: ,:, 5: =.":, :2: (:) ._,'- 1 ('). 4 .21 Pi_ O.._'::' :::_. :E: 6 2,41 N 69.00 E 5:'. 5' :3 t'4 40. Oc} E 20.64 N 42.0o E :3:'::. 91: N 45: · 00 E 48.96 N 46.00 E 65.6:3 N 46.00 E ::::4.62. I',.t 46,0 c) E ,:') f"=~. 89 N 4 ::::. ,:")0 E :32.95 N 52.c) 0 E 62.2l N 49.0("], E '.:.,'5.64 N 50. c"),:") E 5) 2.'. 11 iq 51.(')0 E 18.06 N 52.("~0 E 569.1:E: N 5:3.00 E :36. 15 N 56.00 E 9t4.14 N 56.00 E 5566 24 :'::0 536:3.24 5282.89 1(')28.08 N 55. O0 E · _,=' "~'-'"":. .:,o '"'6.-- :::0 .... .~/_-,98.9:B ?;/-, 18.6:3 11 :::::B. 14 iq =i']._ ._. 00 E &,()2"} 2/-, 0 .=-i 78(-) /,0 =i' '::'.~ ..-z.o. · _ 7 C) C) 1 ""'-"-' :2:7 N '";'"' 00 E ..... · -- . . · m...- ._ ._1 · ..:,L A.=i',:' 7 38 6447 03 1 =~'"' ~i 74 N 61 00 E -- -- - -- --.~-- · · -_ s_~.. i, ~ 6922 24 45 6586.47 /o506.12 1612.73 N 62.(x") E 0. :38 N 2.:3C) E 5. ~":"/-_, N :'~_,. 4:3 E 13.66 N i5.74 E ""'-' '75 N ":' ,' .:.. .._ 4.98 E :7::4 74 N ""' ~:' '78 · .~, ._1 II E 46.5:2: N 4'7. 'ii) 9 E 59.97 N 61.90 E '74./:,:7:: N 77.08 E 9'o.... 2c). N 9:5: . .=~'7_ E 11 f'). '?::: N t 2..' !. 28 tE 1:32.82 N 146.9i E 194.56 N 221.8t E '.'<73. :"::0 N :'::2(2). :::: 1 E :365.56 N 441.c"~4 E 462.6(:.) N 57'7.08 E 562. 14 N 724.66 E 626.70 N :.2:18.5:::: E 718.55; N '.-} 49.77 E 741.64 N 9:.2:2.7:3 E ':'":":',...,._,._,. 50 N 1116 .40. E 9:35.55 N 12:.2:2.9:-:: E 94:3.4'7 N 1:306.7:':: E '7227 2:3 0 6:B65. :36 67:B5.01. 17:35.6'7 N 6'.7.0(') E 1(':)c)6.42 N 1415· 72 E 7'692 .... z :I. cl 7296.. 4:5: 7216.. 1 :':: 19ex:::. .65 iq ~: .... 5 0(') E 1 (1):.2:4 · 14 i`4 1 ']7.. l . ._=,c-'.., E: :3i00 21. 15 '7677.0/-, .... 7.=;9/-, . '71 ,.'-'c-y-'"".....,.,. 60 N 7:'-:: . (')0 E 11:7::(7.} .69. N 171(") . '7:2: E 2.46 N 69 0 0 E 9.94 N 58 3 15 E 20.84 N 49 2 24 E :34.47 N 46 26 51 E 49.88 N 45 50 46 E 6,6.85 N 45 53 6 E 86. 18 N 45 54 39 E 107.76 N 46 7 44 E i34.97 N 46 54 3'7 E 1/:,4.:36 N 47 3:3 i('~ E 198.C)5 N 47 5:3 3 E 295.04 N 48 44 40 E 421.44 N 49 34 16 E ._'=.i-/'-",~. 85 N ._,'=c.)2(') 4.5 E 7:39.61 N 51 17 1 E 917. 1:3 N 52 11 5:2: E 1030.94 N 52 33 46 E 1190.95 N 52 53 26 E 1231· 18 N 52 57 34 E 139:3.2:3 N 53 15 18 E 1587.81 N 53 53 58 E 1614.66 N 54 1:2,'5 E 17:37.00 N 54 35 29 E 1909.25 N 55 24 2 E 2050.63 N 56 32 15 E ,:,. 1'."} 1 .o"". R26 c). 807 2. :394 C") · '"" ''=' '"' ._1 ._1 1. 648 1. O75 :2:. 059 ..-., /,:-:,..;: :~[ ..' ,-_,._~ 0 '-'/ ("). 171 0.14:':: 0. 128 () · :3:B9 · ~-i 0 ._..:,4 C). 5:3:.2: 0. 549 0. c) 52 0. :37:.2: 0.47 0 ._74 0.4:38 0.42:3 DAT'A INTERF'FiL. ATED FLR EVEN 100 FEET OF' SUBSEA DEF'TH 1-:B-8:3 :£AS. CPTH 3723 :':;8:32 :3,942 4052 4i61 4271 4381 44';> t 4600 47 i 0 4820 49'30 5148 5 '257 5:367 54'74, 5585 5696 5:307 59 Z 8 6 i 40 6.252 636:2: 6474 6584 6695 6806 7 (_) ~ .J '7 ~ ""~' 7244 7:352 / ~ .J 7.I 'I'RU VERT SUB L;EA MD-'FVD VERI-ICAL El E P TH D E F' T H D I F F. Ii: ID R R E C T :76 :::: 0 :':: 600 42: 'F/ :::: 780 :2:700 ~ ':' 9 :38F:() .... '"" '" · :,,:, U U 62 10 ::: 980 :2:900 72 10 4080 40 (') 0 81 9 41 ,:, J 4100 '? 1 10 4280 42(") 0 101 10 4:2::::: 0 4:2:00 1 l 1 10 44 ::: (') 440 (') i 20 '? 45 :.:', ,:.') 450 ti i :3 (') 10 4680 4600 140 10 4'780 4700 1 .... J 10 · ,:,,:. o 48 (:~ 0 159. 4980 4'? 00 168 '? 50 ::::: t':) 5'[1) ,Iii 0 177 '.:'.,' ._, 1 F-': 0 ""' (:,0 · :, 1 18'7 1 t") 52:80 570 (-~ 1 'P 6 5:2: :::', t':~ 5 :'::: t-:, (') 205 S' 54 ::: ('~ 54 (')0 ":' ]. 6 ]. i -- . .. 5.5; 80 5500 227 1 l 56 :B (") %/-, (-) t"~ "--' "-" ':' ..... · - ..... i1 57:30 5700 249 11 C-~l--~¢-,s - -- -- . . ._ c., ,:-, 0 .=i :.:: 00 260 11 5 9 8 0 ti ?) 0 0 2 '72 12 L-, 080 600 (') 2 F: :2: l i 61 ::: 0 61 (')0 294 11 :, .-' ,:. U L-, 200 :':: c) 4 10 6 :':: 80 6:2:00 :2:1.5 11 64:3 t'-~ 6400 :326 11 6580 65'[;) 0 :3:36 10 /-,?':::0 /-,700 ""F,~-- _ ....... .: ..... , 1 6880 /:. 800 :36 4 '? 6, 98 0 6 '? 0 0 :3 '7 2 8 '708 (;) 7 (') 0 (i 3'79 7 t:4EL_A'f' I VE CCiORD I NATES FRI I" ' Z It WELL-HEAD 184.51 N 21'":'... 9:::. _ N 241. 13 N 268. :BE, N 296. :33 N :':::2::::. '76 N :'-':51.16 N ::-:7:::. 51 N 405.4:2: N 4 ::: 1. :32 N 457.67 N 482. '~.~::: N 507.79 N 5:32. :2:0 N 556.44 N 5:::0.55 N 605.45 N 6:31. '"-:."2 iq 657. '77 N d,:::5. :3:':: N '71:3.28 N 74i. 57 N 76'?. 44 N '7'77. i0 N 824.55 N 851.45 N 877. 15 N 901.66 N '724. '?'? N 94'7. 15 N 968 · 4:':: Iq 98'9. 18 N (")il)9. :38 N 028.63 N t)47· 06 N 209.44 E 244.65 E 279. S¢2 E "" =' 3 · :, 1 ._,. 1E 350.40 E :386.02 E 421. '79 E 458. :34 E 495. il E 5:32.2'7 E 569.79 E 607.22 E 644.08 E /_-,80.41 E '7i6.20 E '751.80 E 788.04 E 825.04 E '"'Y-':' ':'.~]E '? 02. :32 E '742· 23 E '782.64 E 1022.66 E 1062.8:3 E 1i(i:3.15 E 114:3.42 E 118:3.64 E 122:::.86 E 1264.04 E 1:304.24 E 1344.26 E 1:38:3. :30 E 1421.29 E i ~ 5:E:. i 9 E 1494.6I E ,~H!r3 H-18 RECORD OF SURVEY ~'iEAS IZIRIF"F TRUVERT '.::;UBF;EA F-:EC"FION DIRE..] ION RELATIVE COFIRDINATES 3EPTH 'EIG MN DEPTH DEP'T'H FI.I::::;T ANGLE FROM WELL-HEAD ::3417 20:3¢) '7'~)7:3. s.'5 7L::'~2.90 2 i '=;':"..S'" 79. ~":' "" '-' .... , ._ 7 N ,0(") E 11 ......21 iii 1 ,=:.,::. l, 42 E :::: ':.;' ','": 2 20 0 '"" ~' ,r" '"" ...... .... · '-, ...,., ..-,..:: z: F.: 422 ':.,' 7 '""""'""' ._, . . .-...:,..., 1,72 N E:/:,. (")'[") E 117:3.72 N 2 (") 1_ '=i :1. ,~,':' E CLOSURE D I '.:::; T A i'"4 C E D G i"'l N S 2155.E:0 N 57:3'.::> 3:3 E 233~..(~.,0 N 59 40 33 E DOG LEG ,2 e ~ / i (2) 0 O. 24,~:) ('). 170 ) DATA INTERPOLATED FOR EVEN 100 FEET OF '.-];UBSEA DEF'TH 'EA'.3. :EP'i-H 180 280 :B80 48<') 7:F:0 :L 0:30 t 180 3. 280 1. :380 i 4:3 0 1580 3. 68 () 1 -/80 i :3 80 1980 2080 21:30 22 :B 0 2:380 2480 2 5:31 :268 i 2782 288:3 :3086 :31:3 9 :B 29:3 3:398 :3505 36 t 4 TRU VERT DEPTH ........... ? 1 ,:, .) 280 :::80 580 5:B0 '7:30 880 980 10 80 11'-'(' 0 .) 12:::0 1:3 80 148 C) ! ~ 80 1680 3. 780 i l:l {:: (") 1980 2080 2180 2280 2480 2580 2680 2780 2880 29:30 :308() · _.':' 180 :3280 :3:3:30 348(] · .:, ._{ ,~, .) '.SUB SEA MD-TVD VERTICAL D E P'I' H D i F F'. F: 0 R R E C T 100 0 0 '20 (] 0 0 :300 0 400 0 0 500 0 0 600 0 0 700 0 0 :B00 0 0 900 0 0 1000 0 0 1 100 0 0 1200 0 0 1:300 0 0 140 C) 0 0 i 500 0 0 1600 0 0 1700 0 0 1800 0 0 1900 0 0 2000 0 0 ~" :' 1 n . c). 0 o 22. 00 0 0 2:300 0 0 2400 0 0 2500 1 1 2600 1 0 2 700 2 1 2:300 3 1 2900 5 2 :3000 6 1 :3100 9 :3 3200 13 4 :3:300 1 ':' 3400 '-' =' ~,_1 7 · : .... t) t) :34 R E L A T i V E C 0 OtR ~'i I N AT E S F'ROiq WELL-HEAD -- .- 0.00 0.00 0.00 0. O0 0.00 0.00 (). O0 0.00 O. 00 0. O0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 O. 00 0.00 0.00 0.00 0.00 O. 00 0.00 0.00 0.00 0.00 0.00 C). 00 0.00 0.00 0.00 C). 00 0.00 0.00 0.00 0.00 0.00 0.00 O. 00 0.00 0.00 0.00 0.91 N 1.40 E 4.61 N 7.79 E 1:3.60 N 1='._, · h.:~- .. E 24.54 N 25.72 E :36. :32 N :37.'3)4 E 50.45 N 52.05 E 6._,. '""C . ,:, J N 68 04 E 83.86 N :3:3.27 E 104.21 N 11:3.40 E 128.:37 N 142.23 E 156.40 N I75.~0 E D A T A I NTERF'OLATED FOR EVEN 100 FEET OF "-'1 "' ..... · :, J B.:, E A D E F' T I-4 1 -:3--:_:::3 : AS. :ii?TH '756'7 '7675 7782 79'il) '7 8 :L 04 F:211 8:3 'i 8 8425 86:}'::::: 8745 '2, 851 TRU VERT DEF'TH 7180 7280 7:380 748o 7580 7680 77:::0 788 ('~ '77.)80 80:30 8180 828("~ 8:'-':80 84'::::0 · :, J B t::; E A i"1D- T V D V E R T I C A L [ E F ] H D I F' F'. F:r] R R E' f': T '7 100 ":"-'" ._,,::, 7 ':' 7200 :395 8 '7:300 40':..' 7 74 ('~ 0 410 . 75 ('~ 0 41 '7 7 7600 424 7 7 '7 ("~ ('~ 4 ::: 1 7 7800 4-:3F: 7 '7900 445 7 E:000 4._ ,.. 7 810 0 4 5:3 6 82 ('~ 0 465 7 8:3 ('~ (') 47 1. 6 84 (':) 0 478 7 R E L A T i V E C 00 R D I N A"i' E S F'ROM WELL.-HEAD 064.68 N 1.5:30.5:3 08:L.50 N 1565.92 09'7.0:3 N 16(')1. 15 ti0.50 N 1637.29 121.82 N i674.28 1:30.96 N 1711.98 1:38.86 N 1749. '72 146.44 N 1'78'7.07 153.72 N 1824.02 160.:34 N 1860.66 166.09 N l :~:9'7.2.8 170.97 N 1933.86 174.98 N 1970.:38 i78. 12 N 2006.82 ~i0 H-18 DA'FA INTERPOLATED FOR EVEN 100('~ FEET OF' MEASURED I)EF'"I"H i MEAS. TRU VERT SUB SEA DEF'I"H DEPTH DEPTH :2 ('3 0 0 2 0 0 0 1. ".9 2 0 :300 () 2996 2916 40 00 :3933 385:':: 5000 4845 4765 6000 5755 5675 7000 6657 6577 8000 7584 7504 Fi F' L A T l V E C 00 R ]31 N A T E $ F'RC~ffl WELL-HF'AB HORIZONTAL VIEW SOHIO ALASKA PET. WELL H- 18 RADIUS OF CURVATURE SINGLE SHOT SURVEY JAN. 5~ 1985 SCALE I"= 500' 8400 TVD: 8505' TMD: 8982' ALL DEPTHS SHOWN iARE TVD Suggested form to be inserted in each "Active" well folder 'to check for timely compliance with our regulations. Oi:~. ator, 0oll N~ and Numl~r · Reports 'and Materials to be received by: ~- ~7-- Date Required Date Received Remarks · Completion Report Yes / '. · Well .History. Yes /--3/~"g3 ~K . Core Ch s ..... ~/~/y~. . . . Core Descripti°n "/~,,~e--' - Registered Survey plat yL~:~.5. Inclination Survey A/0 { ,3/'"o°3SS Drill Stem Test Reports , , ,x×~e ..... '- O K , ,, · prCduct, ion Test Reports Logs Run. Yes / ,,, , . Digitized Data y~ . ~._ /~_~ ,-. SOHIO ALASKA PETROLEUM CO,';~PANY 31 1 1 "C" STREET ANCttORAGE, ALASKA SFO ARCO TELEPHONE (9071 265-0000 MAIL: POUCH 6-612 ANCHORAGE, ALASKA 99502 EXXON PHILLIPS STATE OF AK Date: 2-11-83 Trans.#: CC#: 56127 Getty Sta_te~]. 1-4-83 '~D-22 1-6-83 Q-2 / 1-8-83 ~'~F-18'"~ 12-20-82 - /"H-18~ 1-3-83 ~C-3~_ 11-25-82 *~22~ 1-5-83 "C-28 12-30-82 *B-22 8-22-82 *C-27 11-27-82' ~S-2Z '12-11-82 CENTRAL FILES (CC# ' s-Transmittal Only REFERENCE: /SOHIO NAGNE_~TI_C_.LI___S. TAPE_____~S a LISTINGS . ~he following material is being submitted herewith.-Please acknowledge receipt by signing a copy of this letter and returning it to this office:- C.H. TDT-M Open Hole C.H. C.H. Open Hole C.H.- ~L C.H. QNL Open Hole BHC-AC/CDL-CD/CN BHC-AC/CDL-CD/~N O.H. Replacement O.H. Replacement DIFL, BHC/AC, CDL- CD/CN O.H. Replacement DZFL , BHC/AC , CDL- ACC 66256 ACC 66304 ACC 66306 ACC 66247 ACC 66257 ACC 66336 ACC 66204 ECC 1539 ECC 1590 ECC 1423 ECC 1373 DEC 1546 EOT 1075 ECC 1566 Run #- Dres'~ Run #- Dres Run #- Dres Run #- Dres Run #- Dres Run #- Dres *SFO & EXXON' An Asterisk:(*) next to a listing abouve means you should have received the Tape(s) and Listing(s) directly from the respective service company. Please confirm this ' _~~ ~ ,,- i ' ~-" ~"£~ I,"" , ~ECE,VEO ~2~ :~~~~ Ar.ne Jones ~~ Development Geology DATE · ~- , i _ r~ · A!~.b~ (ti! ~ 0::~ C::.~-.:. ~-,. ......... , . "' "-' ;J:~0 December 17, 1982 Mr. R. H. Reiley District Drilling Engineer Sohio Alaska Petroleum Company Pouch 6-612 ; 5~2 Anchorage, Alaska ~9 ~ Prudhoe Bay Unit H-!8 Sohio Alaska Petroleum Conpany Permit No. 82-210 Sur. Loc 700 ,o,.~? ~..,~L, ~.~, 1735'~'~ Sec ~I, TI!N, R13E, UP~4. Bt~hol~ Loc 736'~ 455 '~ · · . ~o~, ~_~, Sec. 15, TllN, R13E, UPM Dear ~r. ~eiley = Enclo~ i~ the approved application ~o~ per,it to ~rill the above referenced well. Ii ~ is conducted, a one cubic inch chip fro~ each foot of cor~.g recovered core is ~e~uired_ ~ . S~ples of well cuttin~s~o and a ~d los ara nn~ required. A n ~ ~, dir tiomat survey is required as pe~ 20 AAC 25.050(b)(5). If available, a tape containinK the digitized log info,etlon sn=ll be submitted on all lo~szor = copying except experiments!. ~ ~ lo~s,~, velocity surveys and dipmeter surveys. t~r drainage systems have been ?~any rivers in Alaska and ~ classified a~ important for the spa~i~g °r migration of anadromous fish. Operations~ in t~_ese areas are subject AS 16 ~' 870 and the regulation~ pr~ulgated thereunder (Title 5, Alaska Administrative Code). Prior to comp~encing ~{mbitat Coordi[mtor's operation~ you ~ay be contacted by the Office, Department of Fi~,~ and ~oll~tio~ of ~' ~ater~ of the State is pr°hibi~ed by AS 46, Chapter 3, Article 7 and the regulations promulgated thereunder (Title 18, ~la~a Administrative Code, Chapter 70) and by the Federal ~gater Pollution Control Act, as a~end~d. Prior to connencing operations you may be contacted by a repre~entat'ive of the Department of E~viror~ental Conservation. ?O aid u~ in scheduling_:_ field work, please notify this office 'O 2~ hours ~r~ r to ~.~,~ - installation of the bioweut Mr. R. ~. Reil~y Prudhoo Bay Unit 9_ December 17, !9~2 i~evention equipmmnt so that a ropresentative of the Commission may be present to witness testing of the equipment before the surface casing shoe is drilled. Where a diverter system is required, please also notify this 'office 24 hours prior to commencing equipment installation so ghat the C~mmis~ion may ~tne~s testing before drilling below the shoe of the conductor pipe. In thle event of suspension or abandonmant, please give this office adequate advance notification zo that we may have a wi tness Present. V~ry truly your C. V. Chatterton B .... ~- .. t~laska Oil and Gas~ Conservatio Eno io aure '~ m Habitat ~ ' __ ~ectxon w/o encl cc: Department of DePartment of Environmental Conservation w/o encl. CVC: be SOHIO ALASKA PETROLEUM COMPANY 3111 "C" STREET ANCHORAGE, ALASKA TELEPHONE (907) 276-5111 MAIL: POUCH 6-612 ANCHORAGE, ALASKA 99502 December 8, 1982 Alaska Oil & Gas Conservation Conm~ssion 3001 Porcupine Drive Anchorage, Alaska 99501 Attn: Mr. C. V. Chatterton Gentlemen: 'WRT;L H-18 ~ (14-15~11'13) 'PBU Enclosed are the following documents, in triplicate, along with our check for $100 to cover the permit filing fee. 1. Application~for Permit to Drill; 2. Proposed drilling program outline; 3. Proposed Blowout Prevention Diagram; 4. Surveyor' s plat show/rig well location; 5. Directional map. If you have any questions, please call Ted Stagg at 263-5173. encs Yours very truly, R. H. Reiley District Drilling Engineer Well File ~17 DEC 0 8 982 4nchorage STATE OF ALASKA ALASKA lu,L AND GAS CONSERVATION CC MISSION PERMIT TO DRILL 20 AAC 25.005 la. Type of work. DRILL [] REDRILL [] DEEPEN [] lb. Type of well EXPLORATORY [] DEVELOPMENT OILI~ DEVELOPMENT GAS [] SERVICE [] STRATIGRAPHIC [] SINGLE ZON EI~ MULTIPLE ZONE [] 2. Name of operator Sohio Alaska Petroleum Company 3. Address Pouch 6-612, Anchorage, Alaska 99502 4. Location of well at surface 700' SNL, 1735' WEL, Sec. 21, Ti]lq, R13E, UPM At top of proposed producing interval (~get) 650' NSL, 325' :~, Sec. 15, Ti:L~, P&3E, fJT~ At total depth 736' NSL, 455' EWL, Sec. 15, TllN, R13E, UPM 5. Elevation in feet (indicate KB, DF etc.) Est. KBE = 80' AMSL 6. Lease designation and serial no. ADL 28284 9. Unit or lease name Prudhoe Bay Unit 10. Well number H-18 (14-15-11-13) PBU 11. Field and pool P~__~_hoe Bay Prudhoe Oil Pool 12. Bond information (see 20 AAC 25.025) Type Bla_r~et Surety and/or number Safeoo Z~s. 2975387 Amount $200,000.00 13. Distance and direction from nearest town 14. Distance to nearest property or lease line 15. Distance to nearest drilling or completed NW of Deadhorse - 10 miles South of ADL 28281 - 4630 feet well H-13 - 1900 feet . 16. Proposed depth (MD & TVD) 97691 MD - 9248' TVD feet 17. Number of acres in lease 2560 19. If deviated (see 20 AAC 25.050) 120. Anticipated pressures KICK OFF POINT 2600 feet. MAXIMUM HOLE ANGLE 23 Ol (see 20 AAC 25.035 (c) (2) 18. Approximate spud date January 5, 1983 3330 psig@ Surface 4390 psig@L88(~0 ft. ~(TVD)f 21 Proposed Casing, Liner and Cementing Program SIZE SETTING DEPTH QUANTITY OF CEMENT MD TOP TVD Hole ~ 36 17 1/2 _12 1/4 8 1/2 Casing 20 x30 Weight Insular 13 3/8 729 9 5/8 479 269 22. Describe proposed program: CASING AND LINER Grade J Coupling .ed Conductor L-80 ]Butt. -80 Length 80 Surface 2500 Surface 8848 1171 Surface I 8598~, 8170 MD BOTTOM TVD 110! 110 25001 2500 88481 8399 I (include stage data) 8 cu.yds, concrete 3720 cu.ft. Permafrost 1193 cu. ft. Class G; i30 cu.ft. Permafrost 300 cu. ft. Class G w/18% salt See attached proposed drilling and completion program. As shown on the attached directional plat, we are aware of the' potential intersection problems which can result from the drilling of this well. If during actual drilling operations, one of these intersections is approached within hazardous proximity, the well to be intersected wiii be shut-in. ~ ~ -~ ~ I V ~ D DEC 0 8 1982 ~ A!~.ska. f~il & Gas Cons. Commission 23. I hereby certify that the foregoing is true and correct to the best of my knowledge ARoh0rage ~~~~ ~ District Drilling Engineer SIGNED TITLE DATE , The space be ow or Commission use R H ~zley CONDITIONS OF APPROVAL Samples required []YES '~]NO Permit number ..:/¢/: t..:' Form 10401 Mud Icg required [-]YES )~'NO Approval date /~. 2Ll7/82 . Directional Survey required ~LYES []NO number SEE COVER LETTER FOR OTHER REQUIREMENTS ,L~OMMISSIONER DATE December ]7; 19R2 by order of the Commission Submit in triplicate WM~.L H-18 (14-15-11-13) PBU PROPOSED DR~.T.TNG AND COMPLETION PROGRAM Dry bucket 36" hole to 80' below ground level and cement 30" x 20" insulated conductor to surface using 8 cu. yds..concrete. Drill 17 1/2" hole to 2500' and cement 13 3/8" 72~ L-80 Buttress casing to surface using 3720 cu. ft. Permafrost II cement. Blowout prevention program consists of 5000 psi W.P. pipe rams, blind rams and annular preventer frc~ 13 3/8" casing point to T.D. Maximum possible bottomhole pressure is 4390 psi at 8800' TVDss based on original reservoir pressure. ~ possible surface pressure is 3330 psi based on a gas column to surface from 8600' TVDss and an oil column to 8800' TVDss. Directionally drill 12 1/4" hole to 8400' TVD. Run 9 5/8" 475 L-80 Buttress casing to 8399 ' TVD and cement first stage with 1193 cu. ft. cement. Cement second stage through D.V. packer collar at 2600' with 130 cu. ft. Permafrost C cement. The 9 5/8" casing will be hung at surface, the 9 5/8" x 13 3/8" annulus will be Arctic Packed. Directionally drill 8 1/2" hole to T.D' at 9248' ~/D. Cement 7" liner to 25G~ inside 9 5/8" casing shoe with 300 cu. ft. Class G cement with 18% salt. Run 7"/5 1/2" Combination Buttress IPC tubing with a production packer assembly at 8124 ' TVD. A subsurface safety valve with dual control lines will be placed at 2100 '. Displace tubing to diesel. Install and test Xmas tree. Suspend well for perforating subsequent to rig release. Details of proposed perforations to be sukmitted on Sundry Notice to follow. B.O.P. ,~STACK CONFIGUR4~ION 5/8" TRIPLE RAM STACK 5000 PSI WP DRILLING ANNULAR PREVENTER PIPE RAMS BLIND RAMS CHECK 2' KILL LINE GATE DRILLING SPOOL CHOKE LINE HAND GATE GATE PIPE RAMS HYDR. ASST. GATE I 20 3, .o 1_2. o__20 30 .o I - I-7-: : ..... I ' : ....I .... 15 ..... .... t .... ....-1--..~-; ...... . ,; ......... : / (.Proposed) : (Proposed) 04 I ! -.~.1. ~ 325' 2375 ~ - _ .... I ~. ,oo.,'~.,s.. _. O~ ~ I o, ! : I -- ----~: o, I: I- . f$4 -15- II- I$2 PAD DETAIL SCALE I"= :500' I__ I~,PORTION T. II N.,R. 13E. SCALE I": I/2 MILE CERTIFICATE OF SURVEYOR i hereby certify that I am pr,operly registered to practice land surveying in the State of Alaska and that this plat represents alocation survey of the wellpad shown and the wells thereon. This survey was made by me or under my supervision and alldimensions and other details are correct. Bottom hole locations are furnished by others. . /L/'o v. ,.~., Da.~e RE£EIYE~ DEC 0 8 1982 Alaska 0ii & ,9as Cons, rjolnrni Anchorage PLAT 3 OF 3 PAD "H" EXTENSION Loceted in NE I/4 PROTRACTED SEC. 21, T.. IIN.iR.I:SE.IUMIAT MER. iALASKA Surveyed for ~OHIO ALASKA PETROLEUM CO. Surveyed by ~,io~ F.M. LINDSEY I~ ASSOC. LAND & HYDROGRAPHIC SURVEYoRs 2502 West Northern Lights Boulevard Anohor~eI Alaska Box 4-081 A-12731 -82 WELT, H-18 (14-15-11-13) PBU ~ 'PO4J L~i(E ~ FULL REPORT 5EHI' TO TI~ PRINTER L~RSIC# 5.3 FOR PROJ~ tELL ?OP 64~R4i.eO ~OTTOR G44702,32 NOTE * ~LL --- CLOSEST RPPR(MCH ~LV~I$ --- UELk Ii)~HT ~ /HZNIBV~ CLOGEGT TUD ~ ~ ~ DXST~ 16.i G,G e.e e.e i~,G O.O e.O e.e 4~.4 ~.~ ~,~ ~,4 117,3 ~-S ~.~ 9143.0 1~,7 9i84.S ~.~ Si~.G ~1.9 414g. G 9184.5 ~.~ ~t?.O ~.R 4.3 e.O e.O O.e 14~,9 1~.5 e,e i~.O .4 ~, 1 ~1B,4 ~ ~,G ~,3 31~,~ 431,7 ~G-G ~.1 ~,~ ~.7 ~.4 ~.G 0,~ O.O 2.1 .8 ~91~ ~-O g4.3 31~.1 431.Z ~5.4 Ti~ bELL {{filCH COPES (~LOr--~T TO TilE Pi~YOS[l) t,'ELI. 19 C[.05EGT Pa°PR~ DI~i'RfICE - '79,;~ ¥ H ? · I~-Y,T, H-18 (14-15-11-13) PBU 7° Lead Line UERTIC~L IHTERGECTION /PROPOG~D% /h'~fd~¥~ VERTICAL TUD DF--ISOmer' TUD DF_I'~MET DIST~b~ICE 3B~0,.5 86,e 35~?,7 4~B.G 3~3,1 4443.4 ~84,4 3674,8 14G,7 -TG4,G ~342.~ 2493.4 G?02.1 ~30.8 WET,I, H-18 (14-15-11-13) PBU - COURSE LINE YOU LZI~ A FULL R£PO~T SENT TO THE PRINTER ? HO -~ CLOSEST APPROAGHRf~LVSZ~ --- ~PO~E~ BELL ~OTTOR G44~"~G.44 594~I.~,4S.99 ~104.51 CLOSEST APPROACH t,~E[l,t., I~H7 /PROPOSED\ ~T TV~ DEPOT ~.e e.e e.e e.e ~.G 31~.1 ~.~ 141.g G4~.3 ~4.e ~1.s 1557.5 9i94.S ~.2 93t7.9 ~.i ~4i.3 ~8.6 744i.9 4.S e.e e.e ' ~17.I ~.G ~.9 3t23.4 ~.g ~.~ e.o ~.6 2.t TI~ BELL U~IC~ ~ CL~_ST TO ~ PJK~O~ED BELL IS VERTICAL IHTERSECTIOH /PROPOGEB~ /H[~RSYX VERTI~A~ TVD DEP*U~T TVD ~EP~kT DI$?~d~CE 3238.9 91,4 3~13,7 41e,7 E~GI,G 4360.~ S49.1 3424.2 s9.e -931.9 T3~9.1 1~34,4 G~4,9 ;I30,3 -1337.4 7~g.2 1934.4 68g4.e CHECK LIST FOR NEW WELL PERMITS Company Lease & Well No. ITEM APPROVE DATE (1) Fee (2) Loc (,,2 thr~ 8) 1 Is th permit fee attaChed · e ..............,.......................... · 3. 4. 5. 6. 7. 8. YES ,,, · 10. 11. Is well to be located in a defined pool ............................ Is well located proper distance from property line ................. , Is well located proper distance from other wells .................... 7..~ Is sufficient undedicated acreage ~available in this pool ........... Is well to be deviated and is well bore plat included ..... , ........ Is operator the only affected party .......................... ~ ...... Can permit be approved before ten-day wait ......................... Does operator have a bond in force .................................. ,,?" ~' , Is a conservation order needed .............................. a ....... · Is administrative approval needed ................................... NO REMARKS (4) Casg ~ ~ (12 thru 20) (21 thru 24) 12. 13. 14. 15. 16. 17. 18. 19. 20. 2 1'. 22. 23. 24. 25. Is conductor string provided ......... Is enough cement uSed to circulate ~"~~;~ ~'~ Will cement tie in surface and intermediate °r pr°dUcti°n ~?~s Will cement cover all known productive horizons ............ Will surface casing protect fresh water zones ....... . ............ Will all casing give adequate safety in collapse, tension and burst· Is this well to be kicked off from an existing wellbore ............ Is old wellbore abandonment procedure included on 10-403 ........... Is adequate well bore separation proposed .......................... Isa diverter system required....................................... . Are necessary diagrams of diverter and BOP equipment attached . ~ ' Does BOPE have sufficient pressure rating - Test to ~-~ Does the choke manifold comply w/API RP-53 (Feb.78) .................. J/OT' Additional requirements ............................................. ~j~ Additional Remarks: Geology: Engin~eer ing: HWK _~ LC S ?.~~"BEW rev: 08/19/82 INITIAL ~ GEO, U~IT ON/OFF POOL CLASS STATUS AREA NO. SHORE Well History File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history file. To improve the readability of the Well History file and to simplify finding information, information of this nature is accumulated at the end of the file under APPENDIX. .. No special'effort has been made to chronologically organize this category of information. ~ ',I $OHI. C'! AI..:AS~,A F'F, TRC~LF~II~4 COi'~PAN¥ OOO 000 030 065 N : H-18 000 000 004 065 N : P~i.l:l')~()F: ~AY 000 000 Ol 2 065 OW~: ]. 1. ~,~ 000 000 004 065 ECT: 21 000 000 002 065 (3t)t~: i'.~C}kT~ ;$.[.C~PE 000 000 012 065 TAT: ALASKA 000 000 OU6 Ob5 TRY: IJ.S.A. 000 000 006 065 l'P OlO.N02 V}!,:RI~':[:CAT'IO'~, [18¥1t~(; P,AG~: 2~1 ~.~ :[96,, OF F ';r n 0 0 0 0 4 0 0 0 O: 0 0 12 46 0 0 4 , 0 Ori~?~ 7 0 0 0 0 ~ 0 ¢4 V ' 7 I 0 0 0 = 0 ~API 7 31 32 0 O 4 0 i,}8/F' 60 52: 32 0 0 4. 0 g ~ P ] 60 31 32 t~ 0 4: 0 REPR C 0 D E; 68 6,8 b8 ~8 ~8 G A b~ I 1 68 I 68 ,1. 68 6[4 68 6'8 1 O 6 84 R 1"{ [) E, :~,3574 CAbI 1'1.33 9.7578 66.5000 0,0 3 5 2 2,386 7 2,8965 13,8672 19.093g - 0, C) I.; 3 9 1,9668 2,2559 1.7,o25o 0,006~ 2,2~76 2,2a32 7 . 8 398 18.6094 t], 0 b 93 - 999 , 2500 I:~ C t~a l., 7.0234 I 72 3750 G R 2 · 8,3q[¢4 GR. I 0,2266 ~ 1..,~ ~9,5825 GR 2,2871 NCNL 8,375O GR I 7,15~2 Ibm 86,5()25 2.~125 8,2891 GR 1. 1,601 f, l 83,7500 GR 2,4043 8. 1953 GA 5,0664 '1999,f500 -999, 50(i' -999.2500 5.0859 b7,3750 4680,0000 48,2813 3,4~36 31,203t 3826,0000 44,4375 8,~047 76, O0 373~, 68,0625 8,5547 18.6094 3~58,0000 21,3906 13,6250 20.0469 3662.0000 20.9062 8.8672 18.6875 3614.0000 20,531.3 !.: P T 910 0 ~ -29 ?HI 16 ;~A~I' I 50 00 .2266 5859 ix; (. N GR 1.8,3504.. . 5625 8.9297 NC N L GR NCNb GR I. 1.~ Iv, 4,9492 "' ' '99,9 250C GR 9..9 2500 NCb, I,~ -999,2500 GR 5,5.781 '~999,2500 GR '999,2500 NCNL '999,2500 GR 5,4:883 lbN -999,2500 GR -999'2500 NCNb -999,250o G~ 0938 34,,g 3262,0000 24.,1094 26,2969 14'1,2500 3534,0000 135.1250 16,3281 6~,3750 4012.0000 81,6250 0 000 2000,. ). -99~, 25{ 0 -999,2500 -999,2500 '2000,0000 : 999 ' 2500 999,2500 -999 ~ 2500 2000 , 0000 -999,2500 99 ,2500 EBV ICE.: N A.,q E ERS IOF,, ~ ATE : IbE TYpE EXT FILE ATla; :E3t0.1./2o , V P 0 1 0, i-~ 0 2 V ~: ~ ! ~' .:[ C A T 113 ~ L, i S T .'i: .N G P A G E 6 Run 1' 24 - August - 1993 CNIGR Cased Hole Tape Subfile 2 is type: LIS TAPE HEADER PRUDHOE BAY UNIT CASED HOLE WIRELINE LOGS WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL: FSL: FEL: FWL: ELEVATION(FT FROM MSL 0) KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: WELL CASING RECORD H - 18 500292088000 BP EXPLORATION (ALASKA) INC. ATLAS WIRELINE SERVICES 30-SEP-93 5632.02 K. BRUNNER C. HUGHES 21 liN 13E 700 1735 80.30 79.30 43.10 1ST STRING 2ND STRING 3RD STRING PRODUCTION STRING CURVE SHIFT DATA - ALL PASSES TO STANDARD (MEASURED DEPTH) BASELINE CURVE FOR SHIFTS OPEN HOLE CASING DRILLERS CASING BIT SIZE (IN) SIZE (IN) DEPTH (FT) WEIGHT (LB/FT) 9.625 8964.0 47.00 7.000 9810.0 26.00 5.500 8622.0 17.00 4.500 8761.0 12.60 EQUIVALENT UNSHIFTED DEPTH BASELINE DEPTH 8926.0 8964.5 8993.0 9020.5 9029.0 9031.5 9033.5 9042.5 9048.0 9055.0 9057.5 9066.5 9076.0 UNKNOWN GR PBU TOOL CODE: PBU CURVE CODE: RUN NUMBER: PASS NUMBER: DATE LOGGED: LOGGING COMPANY: GRCH 8926.0 8964.5 8993.0 9020.0 9028.5 9031.0 9033.0 9042.0 9047.5 9054.5 9057.5 9066.5 9076.0 9089.0 9111.0 9126.5 9166.5 9202.5 9231.0 9253.0 9272.5 9275.0 9278.0 9283.5 9470.5 9472.5 9529.5 9546.5 9552.0 9599.0 9631.0 $ REMARKS: 9089.0 9111.0 9126.0 9166.0 9202.5 9231.0 9253.0 9272.5 9275.5 9278.5 9284.0 9471.0 9473.0 9530.0 9547.0 9552.5 9600.5 9631.0 CN/GR Cased Hole. LOG TIED TO BHCS RUN 03-JAN-83. WELL SHUT-IN SINCE 1300 Hrs, 24-AUG-93. WHP BUILT UP TO 1850 PSI. DID NOT SHUT-IN GAS LIFT. NEUTRON LOG PARAMETERS: 2.75" TOOL SANDSTONE MATRIX CASING CORRECTIONS NOT ACTIVE CHISM FILTERING NOT ACTIVE 10.625" BOREHOLE CORRECTION. OPEN HOLE GAMMA RAY FOR DEPTH MATCHING SUPPLIED BY BP EXPLORATION (24-SEP-93). SHIFT PROCEDURE AS FOLLOWS: 1) FIRST PASS GAMMA RAY DEPTH MATCHED TO OPEN HOLE GAMMA RAY. 2) FIRST PASS NEUTRON DEPTH MATCHED TO "SHIFTED" FIRST PASS GAMMA RAY. 3) ALL SUBSEQUENT GAMMA RAY PASSES DEPTH MATCHED TO "SHIFTED" FIRST PASS GAMMA RAY. 4) ALL SUBSEQUENT NEUTRON PASSES DEPTH MATCHED TO "SHIFTED" FIRST PASS NEUTRON. $ FILE HEADER FILE NUMBER: 1 EDITED CURVES Depth shifted and clipped curves PASS NUMBER: 1 DEPTH INCREMENT: 0.5000 FILE SUMMARY PBU TOOL CODE START DEPTH GRCH 8936.0 2418 8949.0 $ CURVE SHIFT DATA - PASS TO PASS BASELINE CURVE FOR SHIFTS PBU CURVE CODE: GRCH PASS NUMBER: 1 BASELINE DEPTH NPHI 8926.0 8926.0 8993.0 8993.0 9020.5 9021.0 9024.5 9024.5 9029.5 9028.5 9033.5 9033.0 9042.5 9042.0 9045.5 9046.0 9055.0 9056.0 9076.0 9076.0 9091.0 9091.0 9102.0 9102.0 9126.5 9126.0 9166.5 9165.5 9202.5 9202.5 9228.5 9228.0 9231.0 9231.0 9236.0 9236.0 9253.0 9252.0 9272.0 9271.5 9277.5 9277.5 9279.5 9279.0 9283.0 9282.5 9471.0 9471.0 9473.0 9474.5 9475.0 9476.0 9529.5 9530.0 9542.0 9542.0 9546.5 9547.0 9550.5 9550.5 9585.0 9586.0 9631.0 9631.0 $ REMARKS: for each pass in separate files. STOP DEPTH 9605.0 9613.0 (MEASURED DEPTH) EQUIVALENT UNSHIFTED DEPTH PASS 1. FUCT, NUCT, & TENS WERE SHIFTED WITH NPHI. GRCH WAS DEPTH MATCHED TO THE OPEN HOLE GAMMA RAY. $ CN : BP EXPLORATION WN : H - 18 FN : PRUDHOE BAY COUN : NORTH SLOPE STAT : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 5 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GRCH 2418 68 1 GAPI 4 2 NPHI 2418 68 1 PU-S 4 3 FUCT 2418 68 1 CPS 4 4 NUCT 2418 68 1 CPS 4 5 TENS 2418 68 1 LB 4 4 86 720 65 6 4 86 720 65 6 4 86 720 65 6 4 86 720 65 6 4 86 720 65 6 20 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: 34 Tape File Start Depth = 9631.000000 Tape File End Depth = 8926.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 8467 datums Tape Subfile: 2 200 records... Minimum record length: 62 bytes Maximum record length: 1014 bytes Tape Subfile 3 is type: LIS FILE HEADER FILE NUMBER: 2 EDITED CURVES Depth shifted and clipped curves for each pass PASS NUMBER: 2 DEPTH INCREMENT: 0.5000 FILE SUMMARY PBU TOOL CODE GRCH 2418 $ CURVE SHIFT DATA - PASS TO PASS BASELINE CURVE FOR SHIFTS PBU CURVE CODE: GRCH PASS NUMBER: 1 START DEPTH STOP DEPTH 8933.0 9605.0 8946.0 9613.0 (MEASURED DEPTH) BASELINE DEPTH GRCH 8926.0 8926.0 8944.0 8943.0 8952.0 8951.0 8982.0 8981.5 8988.0 8988.5 8988.0 8992.0 8991.5 8996.5 8995.5 8997.5 9002.5 9001.5 9005.5 9007.0 9018.0 9017.5 9018.5 9018.0 9019.5 9018.5 9024.5 9029.5 9031.0 9030.0 9040.5 9040.0 9047.5 9054.0 9054.5 9055.0 9064.5 9065.5 9067.5 9069.0 9069.5 9070.5 9100.5 9115.0 9114.5 9116.0 9115.0 9117.0 9118.0 9117.0 9122.0 9123.5 9147.5 in separate files. EQUIVALENT UNSHIFTED DEPTH NPHI 8926.0 8987.5 8997.0 9002.5 9004.0 9024.0 9028.5 9046.5 9054.5 9055.0 9056.0 9065.5 9066.0 9068.0 9069.0 9069.5 9070.0 9100.0 9116.5 9120.5 9122.0 9146.5 9166.5 9181.5 9196.0 9197.0 9201.0 9208.5 9216.5 9234.5 9241.0 9241.5 9247.0 9253.0 9257.0 9267.0 9270.0 9271.5 9288.5 9339.0 9342.5 9343.0 9344.5 9352.5 9361.0 9466.0 9466.5 9469.5 9475.0 9475.5 9476.0 9482.5 9490.0 9500.5 9527.5 9531.0 9535.0 9536.0 9538.0 9541.0 9542.5 9543.5 9546.5 9552.0 9554.5 9563.0 9563.5 9565.5 9593.5 9597.5 9598.0 9607.0 9631.0 $ REMARKS: CN WN FN PASS 2. FUCT, $ 9165.5 9196.5 9241.0 9252.5 9271.5 9288.5 9466.5 9470.0 9475.0 9482.5 9528.0 9531.5 9535.0 9535.5 9537.5 9541.5 9543.0 9543.5 9546.5 9563.5 9564.0 9594.5 9598.5 9599.5 9165.0 9180.5 9195.5 9200.5 9207.5 9215.5 9234.0 9240.5 9245.5 9255.5 9266.0 9269.0 9338.5 9342.0 9343.0 9344.5 9352.0 9360.5 9467.0 9470.0 9475.5 9476.0 9490.5 9501.0 9541.0 9552.0 9555.5 9565.5 9607.5 9631.0 9631.0 NUCT, & TENS WERE SHIFTED WITH NPHI. : BP EXPLORATION : H - 18 : PRUDHOE BAY COUN : NORTH SLOPE STAT : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 5 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GRCH 2418 68 1 GAPI 4 2 NPHI 2418 68 1 PU-S 4 3 FUCT 2418 68 1 CPS 4 4 NUCT 2418 68 1 CPS 4 5 TENS 2418 68 1 LB 4 4 86 720 65 6 4 86 720 65 6 4 86 720 65 6 4 86 720 65 6 4 86 720 65 6 20 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: 34 Tape File Start Depth = 9631.000000 Tape File End Depth = 8926.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 8467 datums Tape Subfile: 3 152 records... Minimum record length: 62 bytes Maximum record length: 1014 bytes Tape Subfile 4 is type: LIS FILE HEADER FILE NUMBER: 3 EDITED CURVES Depth shifted and clipped curves PASS NUMBER: 3 DEPTH INCREMENT: 0.5000 FILE S~RY PBU TOOL CODE START DEPTH GRCH 8934.0 2418 8947.0 $ CURVE SHIFT DATA - PASS TO PASS BASELINE CURVE FOR SHIFTS PBU CURVE CODE: GRCH PASS NUMBER: 1 BASELINE DEPTH 8926.0 8941.5 8944.0 8952.0 8982.0 8990.5 8991.5 8992.5 8997.0 9019.5 9020.5 9024.5 9030.0 9039.5 9040.0 9040.5 9044.5 9047.0 9053.0 9054.0 9064.5 9072.0 9073.5 9076.0 9096.0 9097.0 9114.0 9115.0 9116.5 9119.0 9122.5 9123.5 9166.5 9197.0 9208.5 9212.5 9213.5 GRCH 8926.0 8939.0 8942.0 8949.5 8980.5 8989.5 8990.0 9037.5 9038.5 9045.0 9050.5 9069.5 9071.5 9112.0 9112.5 9116.5 9164.0 9195.0 for each pass in separate files. STOP DEPTH 9605.0 9613.0 (MEASURED DEPTH) EQUIVALENT UNSHIFTED DEPTH NPHI 8926.0 8988.5 8989.0 8994.5 9017.5 9018.5 9022.5 9027.0 9037.0 9042.0 9053.0 9064.0 9073.5 9094.0 9094.5 9114.0 9119.0 9120.0 9206.5 9211.0 9211.5 9214.5 9234.0 9241.0 9241.5 9247.0 9248.5 9253.0 9253.5 9271.0 9272.5 9277.5 9283.5 9288.0 9338.0 9357.5 9358.5 9360.0 9383.5 9384.0 9384.5 9464.0 9466.0 9470.0 9470.5 9477.0 9477.5 9479.0 9482.0 9495.0 9498.5 9524.5 9530.5 9535.0 9538.0 9540.0 9542.5 9543.5 9549.5 9550.5 9551.5 9563.0 9565.5 9593.5 9599.5 9607.5 9631.0 $ REMARKS: PASS 3. FUCT, $ 9239.5 9251.0 9270.5 9276.0 9286.5 9463.0 9469.0 9475.5 9480.5 9523.5 9529.0 9534.0 9536.5 9539.0 9541.5 9542.0 9550.0 9562.0 9564.5 9593.5 9599.0 9212.0 9232.0 9239.0 9244.5 9245.5 9250.5 9268.5 9281.0 9336.0 9355.5 9356.0 9357.5 9381.5 9382.0 9383.0 9464.5 9469.0 9476.5 9478.0 9493.5 9498.0 9548.0 9549.0 9607.0 9631.0 9631.0 NUCT, & TENS WERE SHIFTED WITH NPHI. CN : BP EXPLORATION WN : H - 18 FN : PRUDHOE BAY COUN : NORTH SLOPE STAT : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 5 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GRCH 2418 68 1 GAPI 2 NPHI 2418 68 1 PU-S 3 FUCT 2418 68 1 CPS 4 NUCT 2418 68 1 CPS 5 TENS 2418 68 1 LB 4 4 86 720 65 6 4 4 86 720 65 6 4 4 86 720 65 6 4 4 86 720 65 6 4 4 86 720 65 6 20 * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: 34 Tape File Start Depth = 9631.000000 Tape File End Depth = 8926.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 16934 datums Tape Subfile: 4 147 records... Minimum record length: 62 bytes Maximum record length: 1014 bytes Tape Subfile 5 is type: LIS FILE HEADER FILE NUMBER: 4 AVERAGED CURVES Compensated Neutron: Arithmetic average of edited passes for all curves. Pulsed Neutron: Unaveraged edited Pass 1 gamma ray and background counts; arithmetic average of edited static baseline passes for all other curves. DEPTH INCREMENT: 0.5000 PASSES INCLUDED IN AVERAGE PBU TOOL CODE PASS NUMBERS GRCH 2418 $ REMARKS: 1, 2, 3 1, 2, 3 AVERAGED PASS. GRCH, NPHI, FUCT, & NUCT WERE AVERAGED FOR ALL THREE PASSES. $ CN : BP EXPLORATION WN : H - 18 FN : PRUDHOE BAY COUN : NORTH SLOPE STAT : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 4 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GRCH CNAV 68 1 GAPI 4 2 NPHI CNAV 68 1 PU-S 4 3 FUCT CNAV 68 1 CPS 4 4 NUCT CNAV 68 1 CPS 4 4 35 725 65 1 4 35 725 65 1 4 35 725 65 1 4 35 725 65 1 16 * DATA RECORD (TYPE# 0) 1006 BYTES * Total Data Records: 29 Tape File Start Depth = 9631.000000 Tape File End Depth = 8926.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 15523 datums Tape Subfile: 5 52 records... Minimum record length: 62 bytes Maximum record length: 1006 bytes Tape Subfile 6 is type: LIS FILE HEADER FILE NUMBER: 5 RAW CURVES Curves and log header data for each pass in separate files; raw background pass in last file. PASS NUMBER: 1 DEPTH INCREMENT: 0.2500 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 8933.0 2418 8943.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME LOGGER ON BOTTOM: TD DRILLER (FT): TD LOGGER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): LOGGING SPEED (FPHR): DEPTH CONTROL USED (YES/NO): STOP DEPTH 9613.0 9622.0 24-AUG-93 FSYS REV. J001 VER. 1.1 1457 24-AUG-93 9614.0 9618.0 8950.0 9613.0 1500.0 YES TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE PCM PULSE CODE MODULATOR GR GAMMA RAY CN COMPENSATED NEUTRON CCL CASING COLLAR LOC. $ TOOL NUMBER 3507XA 1310XA 2418XA 2323XA BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE(IN): DRILLER'S CASING DEPTH (FT): LOGGER'S CASING DEPTH (FT): 0.000 9810.0 0.0 BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE TEMPERATURE (DEGF): BOTTOM HOLE TEMPERATURE (DEGF): FLUID SALINITY (PPM): FLUID LEVEL (FT): FLUID RATE AT WELLHEAD (BPM): WATER CUTS (PCT): GAS/OIL RATIO: CHOKE (DEG): PRODUCED FLUIDS 0.00 0.0 0.0 0 0.0 0.000 0.000 0.000 0.0 NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): THERMAL SANDSTONE 0.00 10.625 BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE TOP NORMALIZING WINDOW (FT) : BASE NORMALIZING WINDOW (FT): 0.0 0.0 BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (CPS) : 0 FAR COUNT RATE HIGH SCALE (CPS) : 400 NEAR COUNT RATE LOW SCALE (CPS) : 30 NEAR COUNT RATE HIGH SCALE (CPS): 1030 TOOL STANDOFF (IN): 0.0 REMARKS: PASS 1. NO CNC CASING CORRECTIONS APPLIED & CHISM FILTERING NOT ACTIVE. $ CN : BP EXPLORATION WN : H - 18 FN : PRUDHOE BAY COUN : NORTH SLOPE STAT : ALASKA * FORMAT RECORD (TYPE# 64 ) ONE DEPTH PER FRAME Tape depth ID: F 9 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GR 2418 68 1 GAPI 4 2 CNC 2418 68 1 PU-S 4 3 CN 2418 68 1 PU-L 4 4 LSN 2418 68 1 CPS 4 5 SSN 2418 68 1 CPS 4 6 CCL 2418 68 1 4 7 SPD 2418 68 1 F/MN 4 8 TTEN 2418 68 1 LB 4 9 TEN 2418 68 1 LB 4 4 19 991 67 5 4 86 720 65 6 4 31 149 96 6 4 27 466 87 5 4 28 122 23 5 4 79 150 21 1 4 65 866 87 0 4 31 402 87 0 4 31 402 87 0 36 * DATA RECORD (TYPE~ 0) 1006 BYTES * Total Data Records: 112 Tape File Start Depth = 9629.000000 Tape File End Depth = 8933.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 44785 datums Tape Subfile: 6 189 records... Minimum record length: 62 bytes Maximum record length: 1006 bytes Tape Subfile 7 is type: LIS FILE HEADER FILE NUMBER: 6 RAW CURVES Curves and log header data for each pass in separate files; raw background pass in last file. PASS NUMBER: 2 DEPTH INCREMENT: 0.2500 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 8926.0 2418 8941.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME LOGGER ON BOTTOM: TD DRILLER (FT): TD LOGGER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): LOGGING SPEED (FPHR): DEPTH CONTROL USED (YES/NO): STOP DEPTH 9614.0 9622.5 24-AUG-93 FSYS REV. J001 VER. 1.1 1523 24-AUG-93 9614.0 9618.0 8950.0 9613.0 1500.0 YES TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE PCM PULSE CODE MODULATOR GR GAMMA RAY CN COMPENSATED NEUTRON CCL CASING COLLAR LOC. $ TOOL NUMBER 3507XA 1310XA 2418XA 2323XA BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE(IN): DRILLER'S CASING DEPTH (FT): LOGGER'S CASING DEPTH (FT): O.000 9810.0 0.0 BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE TEMPERATURE (DEGF): BOTTOM HOLE TEMPERATURE (DEGF): FLUID SALINITY (PPM): FLUID LEVEL (FT): FLUID RATE AT WELLHEAD (BPM): WATER CUTS (PCT): GAS/OIL RATIO: CHOKE (DEG): PRODUCED FLUIDS 0.00 0.0 0.0 0 0.0 0.000 0.000 0.000 0.0 NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): THERMAL SANDSTONE 0.00 10.625 BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE TOP NORMALIZING WINDOW (FT): BASE NORMALIZING WINDOW (FT) : 0.0 0.0 BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (CPS): 0 FAR COUNT RATE HIGH SCALE (CPS) : 400 NEAR COUNT RATE LOW SCALE (CPS): 30 NEAR COUNT RATE HIGH SCALE (CPS) : 1030 TOOL STANDOFF (IN): 0.0 REMARKS: PASS 2. NO CNC CASING CORRECTIONS APPLIED & CHISM FILTERING NOT ACTIVE. $ CN : BP EXPLORATION WN : H - 18 FN : PRUDHOE BAY COUN : NORTH SLOPE STAT : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 9 Curves: Name Tool Code Samples Units API API API API Log Crv Crv Size Length Typ Typ Cls Mod 1 GR 2418 68 1 GAPI 4 2 CNC 2418 68 1 PU-S 4 3 CN 2418 68 1 PU-L 4 4 LSN 2418 68 1 CPS 4 5 SSN 2418 68 1 CPS 4 6 CCL 2418 68 1 4 7 SPD 2418 68 1 F/MN 4 8 TTEN 2418 68 1 LB 4 9 TEN 2418 68 1 LB 4 4 19 991 67 5 4 86 720 65 6 4 31 149 96 6 4 27 466 87 5 4 28 122 23 5 4 79 150 21 1 4 65 866 87 0 4 31 402 87 0 4 31 402 87 0 36 * DATA RECORD (TYPE~ 0) 1006 BYTES * Total Data Records: 113 Tape File Start Depth = 9630.000000 Tape File End Depth = 8926.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 43694 datums Tape Subfile: 7 190 records... Minimum record length: 62 bytes Maximum record length: 1006 bytes Tape Subfile 8 is type: LIS FILE HEADER FILE NUMBER: 7 RAW CURVES Curves and log header data for each pass in separate files; raw background pass in last file. PASS NUMBER: 3 DEPTH INCREMENT: 0.2500 FILE SUMMARY VENDOR TOOL CODE START DEPTH GR 8927.0 2418 8941.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME LOGGER ON BOTTOM: TD DRILLER (FT): TD LOGGER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): LOGGING SPEED (FPHR): DEPTH CONTROL USED (YES/NO): STOP DEPTH 9615.0 9623.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE PCM PULSE CODE MODULATOR GR GAMMA RAY CN COMPENSATED NEUTRON CCL CASING COLLAR LOC. $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE(IN): DRILLER'S CASING DEPTH (FT): LOGGER'S CASING DEPTH (FT): BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE TEMPERATURE (DEGF): BOTTOM HOLE TEMPERATURE (DEGF): FLUID SALINITY (PPM): FLUID LEVEL (FT): FLUID RATE AT WELLHEAD (BPM): WATER CUTS (PCT): GAS/OIL RATIO: CHOKE (DEG): NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): 24-AUG-93 FSYS REV. J001 VER. 1.1 1546 24-AUG-93 9614.0 9618.0 8950.0 9613.0 1500.0 YES TOOL NUMBER 3507XA 1310XA 2418XA 2323XA 0.000 9810.0 0.0 PRODUCED FLUIDS 0.00 0.0 0.0 0 0.0 0.000 0.000 0.000 0.0 THERMAL SANDSTONE 0.00 10.625 BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE TOP NORMALIZING WINDOW (FT): BASE NORMALIZING WINDOW (FT) : 0.0 0.0 BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (CPS): 0 FAR COUNT RATE HIGH SCALE (CPS): 400 NEAR COUNT RATE LOW SCALE (CPS): 30 NEAR COUNT RATE HIGH SCALE (CPS) : 1030 TOOL STANDOFF (IN): 0.0 REMARKS: PASS 3. NO CNC CASING CORRECTIONS APPLIED & CHISM FILTERING NOT ACTIVE. $ CN : BP EXPLORATION WN : H - 18 FN : PRUDHOE BAY COUN : NORTH SLOPE STAT : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 9 Curves: Name Tool Code Samples Units 1 GR 2418 68 1 GAPI 2 CNC 2418 68 1 PU-S 3 CN 2418 68 1 PU-L 4 LSN 2418 68 1 CPS 5 SSN 2418 68 1 CPS 6 CCL 2418 68 1 7 SPD 2418 68 1 F/MN 8 TTEN 2418 68 1 LB 9 TEN 2418 68 1 LB API API API API Log Crv Crv Size Length Typ Typ Cls Mod 4 4 19 991 67 5 4 4 86 720 65 6 4 4 31 149 96 6 4 4 27 466 87 5 4 4 28 122 23 5 4 4 79 150 21 1 4 4 65 866 87 0 4 4 31 402 87 0 4 4 31 402 87 0 36 * DATA RECORD (TYPE# 0) Total Data Records: 113 1006 BYTES * Tape File Start Depth = 9631.000000 Tape File End Depth = 8926.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 72996 datums Tape Subfile: $ 190 records... Minimum record length: 62 bytes Maximum record length: 1006 bytes Tape Subfile 9 is type: LIS 93/09/30 01 **** REEL TRAILER **** 93/ 9/30 01 Tape Subfile: 9 2 reCords... Minimum record length: 132 bytes Maximum record length: 132 bytes End of execution: Thu 30 SEP 93 9:16a Elapsed execution time = 30.65 seconds. SYSTEM RETURN CODE = 0 * ALASKA COMPUTING CENTER * ....... SCHLUB~ERGER ....... COMPANY NAME : BP EXPLORATION WELL NAME : H-18 FIELD NAME : PRUDHOE BAY BOROUGH : NORTH SLOPE STATE : ALASKA API NUMBER : 500292088000 REFERENCE NO : 97196 LIS Tape Verification Listing Schlumberger Alaska Computing Center 16-MAY-1997 10:40 **** REEL HEADER **** SERVICE NAME : EDIT DATE : 97/05/16 ORIGIN : FLIC REEL NAME : 97196 CONTINUATION # PREVIOUS REEL : COMMENT : BP EXPLORATION, PRUDHOE BAY, H-18, API #50-029-20880-00 PAGE: **** TAPE HEADER **** SERVICE NAME : EDIT DATE : 97/05/16 ORIGIN : FLIC TAPE NAME : 97196 CONTINUATION # : 1 PREVIOUS TAPE : COF~4ENT : BP EXPLORATION, PRUDHOE BAY, H-18, API #50-029-20880-00 TAPE HEADER PRUDHOE BAY CASED HOLE WIRELINE LOGS WELL NA~E : H-18 API NUMBER: 500292088000 OPERATOR: BP EXPLORATION LOGGING COMPANY: SCHLUMBERGER WELL SERVICES TAPE CREATION DATE: 16-MAY-97 JOB ~ER: 97196 LOGGING ENGINEER: J. PAWLUK OPERATOR WITNESS: A. KRIEGER SURFACE LOCATION SECTION: 21 TOWNSHIP: 1 IN RANGE: 13E FNL : 700 FSL : FEL: 1735 FWL: ELEVATION(FT FROM MSL O) KELLY BUSHING: 80.30 DERRICK FLOOR: 79.30 GROUND LEVEL: 43.10 WELL CASING RECORD 1ST STRING 2ND STRING 3RD STRING PRODUCTION STRING OPEN HOLE CASING DRILLERS CASING BIT SIZE (IN) SIZE (IN) DEPTH (FT) WEIGHT (LB/F~ 9.625 8964.0 47.00 7.000 9810.0 26.00 5.500 8622.0 17.00 4.500 8761.0 12.60 CURVE SHIFT DATA - ALL PASSES TO STANDARD (FIEASURED DEPTH) LIS Tape Verification Listing Schlumberger Alaska Computing Center 16-MAY-1997 10:40 BASELINE CURVE FOR SHIFTS LDWG TOOL CODE: BCS LDWG CURVE CODE: GR RUN NUMBER: PASS NUMBER: DATE LOGGED: 23-DEC-82 LOGGING COMPANY: SCHLUAIBERGER WELL SERVICES .......... EQUIVALENT UNSHIFTED DEPTH .......... BASELINE DEPTH GRCH CNTD 88888.0 88885.5 88886.5 9548.5 9547.0 9535.5 9533.0 9533.0 9532.0 9530.0 9530.0 9520.5 9520.0 9520.0 9490.5 9488.5 9488.5 9483.0 9481.0 9481.0 9481.5 9480.0 9480.0 9475.5 9474.0 9474 . 0 9474.0 9473.0 9473.0 9472.0 9470.0 9463.5 9462.0 9462.0 9400.5 9398 . 0 9341.0 9340.0 9340.0 9328.5 9329.0 9329.0 9298.5 9298.5 9298.5 9295.5 9295.5 9295.5 9292.5 9291.5 9291.5 9285.0 9284.0 9284.0 9281 . 0 9280.0 9280.0 9279.5 9278 . 0 9278 . 0 9273.0 9272.5 9272.5 9253.5 9253.0 9253.0 9250.5 9250.0 9250.0 9237.5 9236.5 9237.0 9236.5 9235.0 9234 . 0 9234.5 9234.0 9232.0 9231.0 9231.0 9229.5 9228.5 9228.5 9203.5 9203.0 9203.0 9192.0 9193.0 9193.0 9167.0 9167.0 9167.0 9152.5 9152.0 9152.0 9127.0 9126.5 9126.5 9124.5 9124.0 9124.0 9110.0 9109.5 9109.5 9108.0 9107.0 9107.0 9103.0 9102.0 9102.0 9102.0 9098.5 9098.0 9098.0 9094.0 9093.0 9093.0 9091.5 9091.0 9091.0 9089.5 9089.0 9089.0 9084.5 9084.0 9084.0 PAGE: LIS Tape Verification Listing Schlumberger Alaska Computing Center 16-MAY-1997 10:40 9083.5 9083.0 9083.0 9080.0 9079.0 9079.0 9076.5 9076.0 9076.0 9070.0 9069.5 9069.5 9067.5 9067.0 9067.0 9064.5 9064.0 9064.0 9063.0 9062.5 9062.5 9061.5 9061.0 9061.0 9059.0 9058.0 9057.0 9058.0 9055.0 9055.0 9054.5 9055.0 9046.5 9046.0 9046.0 9046.0 9043.0 9043.0 9043.0 9042.0 9041.0 9041.0 9033.5 9033.5 9033.5 9031.0 9031.5 9031.5 9028.5 9028.0 9028.0 9026.0 9026.0 9026.0 9010.5 9010.5 9010.5 8997.5 8998.0 8997.5 8995.0 8995.0 8995.0 8994.0 8994.0 8993.5 8994.0 8989.5 8988.0 8988.0 8982.5 8983.0 8983.0 100.0 100.5 100.5 $ CONTAINED HEREIN IS THE CNTDDATA ACQUIRED ON BP EXPLORATION'S H-18 WELL. THE DEPTH SHIFTS SHOWN ABOVE REFLECT CORRELATIONS BETWEEN PASS #1 GRCHAND GR.BCS; AND PASS #1 NPHIAND GR.BCS. ALL OTHER CNTD CURVES WERE CARRIED WITH THE NPHI SHIFT. $ $ PAGE: **** FILE HEADER **** FILE NAM~ : EDIT .001 SERVICE : FLIC VERSION ' O01CO1 DATE : 97/05/16 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUBiBER: 1 EDITED CURVES Depth shifted and clipped curves for each pass in separate files. PASS NUPIBER : 1 DEPTH INCREF~NT : 0.5000 LIS Tape Verification Listing Schlumberger Alaska Computing Center 16-MAY-1997 10:40 FILE SO?4MARY LDWG TOOL CODE START DEPTH STOP DEPTH GRCH 9537.0 8958.0 CNTD 9561 . 0 8958.0 $ CURVE SHIFT DATA - PASS TO PASS (MEASURED DEPTH) BASELINE CURVE FOR SHIFTS LDWG CURVE CODE: PASS NUMBER: BASELINE DEPTH $ .......... EQUIVALENT UNSHIFTEDDEPTH .......... GRCH CNTD REMARKS: THIS FILE CONTAINS CNTD PASS #1. NO PASS TO PASS SHIFTS WERE APPLIED TO THIS DATA. $ LIS FORMAT DATA PAGE: ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 44 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 23 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 0 LIS Tape Verification Listing Schlumberger Alaska Computing Center 16-MAY-1997 10:40 PAGE: ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG 2'TPE CI.~SS MOD NUIV~BSAi~IP ELt~ CODE (HEX) DEPT FT 560334 O0 000 O0 0 1 1 1 4 68 0000000000 NPHI CNTD PU-S 560334 O0 000 O0 0 1 1 1 4 68 0000000000 NRAT CNTD 560334 O0 000 O0 0 1 1 1 4 68 0000000000 CRAT CNTD 560334 O0 000 O0 0 1 1 1 4 68 0000000000 NCNTCNTD CPS 560334 O0 000 O0 0 1 1 1 4 68 0000000000 FCNTCNTD CPS 560334 O0 000 O0 0 1 1 1 4 68 0000000000 CFTC CNTD CPS 560334 O0 000 O0 0 1 1 1 4 68 0000000000 CNTC CNTD CPS 560334 O0 000 O0 0 1 1 1 4 68 0000000000 GRCH CNTD GAPI 560334 O0 000 O0 0 1 1 1 4 68 0000000000 TENS CNTD LB 560334 O0 000 O0 0 1 1 1 4 68 0000000000 CCL CNTD V 560334 O0 000 O0 0 1 1 1 4 68 0000000000 * * DA TA * * DEPT. 9559.500 NPHI. CNTD 20.946 NRAT. CNTD 3.694 CRAT. CNTD NCNT. CNTD 4264.529 FCNT. CNTD 1173.116 CFTC. CNTD 1119.007 CNTC. CNTD GRCH. CNTD -999.250 TENS. CNTD 1410.000 CCL. CNTD 0.000 DEPT. 8958.500 NPHI. CNTD 51.166 NRAT. CNTD 7.222 CRAT. CNTD NCNT. CNTD 2200.873 FCNT. CNTD 309.013 CFTC. CNTD 300.515 CNTC. CNTD GRCH. CNTD 48.813 TENS. CNTD 1400.000 CCL. CNTD 0.000 3.880 4343.034 7.458 2245.487 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .001 SERVICE : FLIC VERSION : O01CO1 DATE : 97/05/16 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .002 SERVICE : FLIC VERSION : O01CO1 DATE : 97/05/16 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : LIS Tape Verification Listing Schlumberger Alaska Computing Center 16-MAY-1997 10:40 PAGE: FILE HEADER FILE NUFiBER: 2 EDITED CURVES Depth shifted and clipped curves for each pass in separate files. PASS NUMBER: 2 DEPTH INCREMENT: 0.5000 FILE SUF~4ARY LDWG TOOL CODE START DEPTH STOP DEPTH GRCH 9537.0 8958.0 CNTD 9561.0 8958.0 $ CURVE SHIFT DATA - PASS TO PASS (MEASURED DEPTH) BASELINE CURVE FOR SHIFTS LDWG CURVE CODE: GRCH PASS NUFiBER : 1 BASELINE DEPTH .............. 88888 0 9554 5 9548 0 9544 0 9539 0 9532 0 9527 5 9525 5 9523 5 9523 0 9521 5 9517 5 9515 5 9514 5 9514 0 9508.5 9503.5 9498.0 9497.5 9495.5 9490.5 9488.0 9487.5 9485.0 9481.5 9481.0 9479.0 9478.0 9476.0 9475.5 9474.5 9473.5 9472.0 .......... EQUIVALENT UNSHIFTED DEPTH .......... GR CH CNTD .............. 88886.5 88886.5 9553.0 9546.5 9542.0 9536.5 9530.5 9530.0 952 6.0 9523.5 9522.5 9522.0 9516.5 9512.0 9501.5 9495.5 9492.5 9488.5 9485.0 9480.0 9476.5 9474.5 9471.5 9520. 5 9515.0 9513.0 9507.5 9496.5 9493.5 9485.5 9483.0 9480.0 9477.5 9474.0 9473.5 9471.5 LIS Tape Verification Listing Schlumberger Alaska Computing Center 16-MAY-1997 10:40 PAGE: 9470 0 9463 5 9463 0 9461 5 9457 0 9455 0 9454 0 9446.5 9439 5 9428 0 9423 5 9421 0 9407 5 9407 0 9404 5 9401 5 9388 5 9383 5 9375 0 9363 0 9355 0 9341 5 9329 5 9313 5 9297.5 9285.0 9282.0 9279.5 9276.0 9274.0 9273.0 9262.0 9254.0 9253.5 9252.0 9251.0 9245.5 9238.0 9237.5 9235.0 9230.0 9220.0 9211.0 9204.5 9203.5 9194.0 9183.5 9183.0 9180.0 9179.0 9167.5 9167.0 9158.5 9154.0 9145.0 9462.0 9453.0 9406.5 9399.5 9284.0 9278.5 9275.5 9272.5 9260.5 9253.0 9251.5 9251.0 9237.0 9229.0 9203.0 9184.0 9181.5 9167.0 9468.5 9462.0 9460.0 9455.5 9453.5 9444.5 9438.0 9426.0 9421.5 9418.5 9404.5 9402.5 9398.5 9386.5 9381.0 9373.0 9361.5 9354.0 9340.5 9330.0 9314.0 9297.0 9284.0 9280.5 9272.5 9253.5 9245.0 9237.0 9234.0 9229.0 9219.0 9211.0 9203.5 9195.0 9184.5 9179.0 9167.5 9158.0 9153.5 9144.5 LIS Tape Verification Listing Schlumberger Alaska Computing Center 16-MAY-1997 10:40 PAGE: 9130.0 9126.0 9111.5 9111.0 9108.5 9107.5 9106.0 9105.0 9103.0 9102.5 9097.5 9094.0 9092.0 9091.5 9090.0 9088.5 9086.5 9085.0 9083.5 9081.0 9079.5 9077.0 9070.5 9067.5 9064.0 9059.0 9057.5 9055.5 9052.5 9051.0 9050.5 9049.5 9046.5 9043.5 9041.5 9034.0 9031.5 9029.5 9028.5 9026.5 9026.0 9014.0 9009.5 9000.5 8999.5 8998.0 8995 0 8994 5 8993 0 8992 0 8991 0 8989 0 8981.5 8980.0 8977.5 9126.5 9111.0 9107.5 9105.0 9102.0 9095.5 9093.5 9091.0 9089.5 9088.0 9086.0 9084.5 9083.0 9079.0 9076.0 9070.0 9067.0 9058.0 9055.0 9052.5 9051.0 9041.5 9033.5 9031.5 9028.0 9026.0 9 O10.5 9000.5 8998.5 8995.0 ~8994.5 8990.5 8982.0 9129.5 9111.0 9106.5 9105.0 9102.0 9091.5 9080.0 9076.5 9063.5 9058.0 9050.5 9049.0 9046.5 9043.0 9034.0 9029.5 9026.5 9014.0 8999.5 8995.0 8992.5 8991.0 8989.5 8980.0 8978.0 LIS Tape Verification Listing Schlumberger Alaska Computing Center 16-MAY-1997 10:40 8963.0 8963.5 8960.0 8961.5 100.0 100.5 101.5 REMARKS: THIS FILE CONTAINS CNTD PASS #2. THE DEPTH SHIFTS SHOWN ABOVE REFLECT PASS #2 GRCH TO PASS #1 GRCH; AND PASS #2 NPHI TO PASS #1 NPHI. ALL OTHER CNTD CURVES WERE CARRIED WITH THE NPHI SHIFT. $ LIS FORMAT DATA PAGE: ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 44 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 23 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUFiB NUM~ SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 560334 O0 000 O0 0 2 1 1 4 68 0000000000 NPHI CNTD PU-S 560334 O0 000 O0 0 2 1 1 4 68 0000000000 NRAT CNTD 560334 O0 000 O0 0 2 1 1 4 68 0000000000 CRAT CNTD 560334 O0 000 O0 0 2 1 1 4 68 0000000000 NCNTCNTD CPS 560334 O0 000 O0 0 2 1 1 4 68 0000000000 FCNTCNTD CPS 560334 O0 000 O0 0 2 1 1 4 68 0000000000 CFTC CNTD CPS 560334 O0 000 O0 0 2 1 1 4 68 0000000000 CNTC CNTD CPS 560334 O0 000 O0 0 2 1 1 4 68 0000000000 GRCH CNTD GAPI 560334 O0 000 O0 0 2 1 1 4 68 0000000000 TENS CNTD LB 560334 O0 000 O0 0 2 1 1 4 68 0000000000 LIS Tape Verification Listing Schlumberger Alaska Computing Center 16-MAY-1997 10:40 PAGE: NAME SERV UNIT SERVICE API API API API FILE NUM~ NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUM~ SAMP ELEM CODE (HEX) CCL CNTD V 560334 O0 000 O0 0 2 1 1 4 68 0000000000 10 ** DATA ** DEPT. 9559. 500 NPHI. CNTD 22.106 NRAT. CNTD 3. 695 CRAT. CNTD NCNT. CNTD 4326.181 FCNT. CNTD 1182.957 CFTC. CNTD 1093.297 CNTC. CNTD GRCH. CNTD -999. 250 TENS. CNTD 1435. 000 CCL. CNTD O. 000 4. 036 4435. 065 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .002 SERVICE : FLIC VERSION : O01CO1 DATE : 97/05/16 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .003 SERVICE : FLIC VERSION : O01CO1 DATE : 97/05/16 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NU~fBER: 3 EDITED CURVES Depth shifted and clipped curves for each pass in separate files. PASS NU~iBER: 3 DEPTH INCREMENT: 0.5000 FILE SUFk4ARY LDWG TOOL CODE START DEPTH STOP DEPTH GRCH 9537.0 8956.0 CNTD 9561.0 8956.0 $ LIS Tape Verification Listing Schlumberger Al'aska Computing Center 16-MAY-1997 10:40 PAGE: 11 CURVE SHIFT DATA - PASS TO PASS(MEASUREDDEPTH) BASELINE CURVE FOR SHIFTS LDWG CURVE CODE: GRCH PASS NUMBER: 1 BASELINE DEPTH 88888.0 9554.0 9548.5 9543.5 9539.0 9534.0 9531.5 9527.5 9523.0 9521.0 9512.5 9508.5 9503.5 9498.5 9495.0 9493.0 9490.0 9489.0 9481.5 9480.5 9479.5 9477.5 9474.0 9470.0 9468.5 9461.5 9456.5 9439.5 9427.5 9420.5 9413.0 9407.0 9401.5 9401 0 9390 0 9383 0 9364 5 9362 5 9354 0 9346.0 9344.0 9341.5 9341.0 9329.0 9313.0 9303.0 9297.0 .......... EQUIVALEITT UNSHIFTEDDEPTH .......... GRCH CNTD 88886.5 88887.0 9553.0 9547.0 9541.5 9536.5 9532.0 9530.0 9512.0 9499.5 9492.5 9488.5 9480.0 9478.5 9469.5 9468.0 9399.0 9363.0 9340.0 9526.0 9522.0 9520.5 9507.5 9503.0 9497.0 9493.5 9487.5 9480.0 9476.5 9473.0 9468.0 9460.5 9455.5 9438.0 9425.5 9418.5 9411.5 9404.5 9398.5 9388.0 9381.0 9361.5 9353.0 9345.0 9342.5 9340.5 9329.5 9313.0 9303.0 9297.0 LIS Tape Verification Listing Schlumberger Alaska Computing Center 16-MAY-1997 10:40 PAGE: 12 9291.5 9290.5 9285.0 9279.0 9273.5 9273.0 9264.0 9253.5 9252.0 9250.0 9245.0 9237.5 9237.0 9235.5 9229.5 9227.5 9222.0 9220.0 9215.0 9211.0 9203.5 9203.0 9199.0 9195.5 9193.5 9183.0 9178.0 9167.0 9152.0 9145.0 9142.0 9130.0 9125.5 9110.0 9108.0 9107.0 9105.5 9103.0 9102 5 9096 5 9092 0 9090 0 9087 5 9084 5 9083 0 9081 0 9076 5 9074.0 9072.0 9070.0 9069.0 9061.5 9060.0 9059.0 9056.5 9291.5 9284.0 9278.0 9272.5 9253.0 9250.5 9236.5 9234.5 9229.0 9203.0 9193.0 9167.0 9152.0 9126.5 9110.0 9107.5 9105.0 9102.0 9089.5 9084.0 9083.0 9076.0 9070.0 9061.0 9058.0 9289.5 9278.0 9272.5 9264.0 9253.0 9252.0 9245.0 9236.5 9226.5 9221.5 9219.0 9215.0 9210.5 9203.0 9199.5 9196.0 9184.0 9178.5 9167.0 9151.5 9145.0 9142.0 9129.5 9109.5 9106.5 9102.0 9096.0 9091.5 9087.5 9082.5 9080.0 9076.0 9073.5 9071.5 9068.5 9060.0 9057.5 LIS Tape Verification Listing Schlumberger Alaska Computing Center 16-MAY-1997 10:40 9055.0 9054.0 9053.0 9050.5 9048.5 9046.5 9043 0 9034 0 9033 5 9031 5 9030 0 9026 0 9014 0 8999 0 8997.5 8995.0 8993.5 8992.5 8991.0 8989.5 8985.0 8983.0 8981.5 8977.5 8963.0 100.0 9055.0 9055.0 9053.5 9050.5 9049.0 9046.5 9043.0 9034.0 9033.5 9032.0 9030.0 9026.0 9026.0 9014.0 8999.5 8998.0 8995.0 8994.0 8992.5 8990.5 8988.0 8984.5 8983.0 8981.5 8977.5 8963.5 100.0 100.5 REMARKS: THIS FILE CONTAINS CNTD PASS #3. THE DEPTH SHIFTS SHOWN ABOVE REFLECT PASS #3 GRCH TO PASS #1 GRCH; AND PASS #3 NPHI TO PASS #1 NPHI. ALL OTHER CNTD CURVES WERE CARRIED WITH THE NPHI SHIFT. $ LIS FORMAT DATA PAGE: 13 ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 44 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 23 LIS Tape Verification Listing Schlumberger Alaska Computing Center 16-MAY-1997 10:40 PAGE: TYPE REPR CODE VALUE 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAFiE SERVUNIT SERVICE API API API API FILE NUM~ NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD~ SAMP ELEM CODE (HEX) DEPT FT 560334 O0 000 00 0 3 1 1 4 68 0000000000 NPHI CNTD PU-S 560334 O0 000 O0 0 3 1 1 4 68 0000000000 1VRAT CNTD 560334 O0 000 O0 0 3 1 1 4 68 0000000000 CRAT CNTD 560334 O0 000 O0 0 3 1 1 4 68 0000000000 NCNTCNTD CPS 560334 O0 000 O0 0 3 1 1 4 68 0000000000 FCNT CNTD CPS 560334 O0 000 O0 0 3 1 1 4 68 0000000000 CFTC CNTD CPS 560334 O0 000 O0 0 3 1 1 4 68 0000000000 CNTC CNTD CPS 560334 O0 000 O0 0 3 1 1 4 68 0000000000 GRCH CNTD GAPI 560334 O0 000 O0 0 3 1 1 4 68 0000000000 TENS CNTD LB 560334 O0 000 O0 0 3 1 1 4 68 0000000000 CCL CNTD V 560334 O0 000 O0 0 3 1 1 4 68 0000000000 14 ** DATA ** DEPT. 9560.000 NPHI.CNTD 22.800 NRAT. CNTD 3.821 CRAT. CNTD NCNT. CNTD 4324.324 FCNT. CNTD 1120.000 CFTC. CNTD 1062.450 CNTC. CNTD GRCH. CNTD -999.250 TENS.CNTD 1420.000 CCL.CNTD 0.000 DEPT. 8956.000 NPHI.CNTD -999.250 NRAT. CNTD -999.250 CRAT. CNTD NCNT. CNTD -999.250 FCNT. CNTD -999.250 CFTC. CNTD -999.250 CNTC. CNTD GRCH. CNTD 35.000 TENS. CNTD -999.250 CCL.CNTD -999.250 4.129 4372.496 -999.250 -999.250 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .003 SERVICE · FLIC VERSION : O01CO1 DATE : 97/05/16 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : LIS Tape Verification Listing Schlumberger Alaska Computing Center **** FILE HEADER **** FILE NAME : EDIT .004 SERVICE : FLIC VERSION : 001C01 DATE : 97/05/16 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : 16-MAY-1997 10:40 PAGE: 15 FILE HEADER FILE NUMBER: 4 AVERAGED CURVES Compensated Neutron: Arithmetic average of edited passes for all curves. DEPTH INCREMENT 0.5000 PASSES INCLUDED IN AVERAGE LDWG TOOL CODE PASS NUM~ERS 1, 2, 3, CNTD THE ARITHFIETIC AVERAGE WAS CALCULATED AFTER CLIPPING AND DEPTH CORRECTIONS WERE APPLIED. $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 $ 73 40 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 25 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 LIS Tape Verification Listing Schlumberger Alaska Computing Center 16-MAY-1997 10:40 PAGE: 16 ** SET TYPE - CHAN ** NA~E SERV UNIT SERVICE API API API API FILE NUFIB NUM~ SIZE REPR PROCESS ID ORDER # LOG TYPE CI.~SS MOD ~ SAMP ELi~ CODE (HEX) DEPT FT 560334 00 000 00 0 4 1 1 4 68 0000000000 NPHI CNAV PU-S 560334 O0 000 O0 0 4 1 1 4 68 0000000000 NRAT CNAV 560334 O0 000 O0 0 4 1 1 4 68 0000000000 CRAT CNAV 560334 O0 000 O0 0 4 1 1 4 68 0000000000 NCNT CNAV CPS 560334 O0 000 O0 0 4 1 1 4 68 0000000000 FCNT CNAV CPS 560334 O0 000 O0 0 4 1 1 4 68 0000000000 CFTC CNAV CPS 560334 O0 000 O0 0 4 1 1 4 68 0000000000 CNTC CNAV CPS 560334 O0 000 O0 0 4 1 1 4 68 0000000000 GRCH CNTD GAPI 560334 O0 000 O0 0 4 1 1 4 68 0000000000 TENS CNTD LB 560334 O0 000 O0 0 4 1 1 4 68 0000000000 ** DATA ** DEPT. 9559.500 NPHI. CNAV 21.803 NRAT. CNAV 3.796 CRAT. CNAV NCNT. CNAV 4301.049 FCNT. CNAV 1145.604 CFTC. CNAV 1095.660 CNTC. CNAV GRCH. CNTD -999. 250 TENS. CNTD 1410. 000 DEPT. 8958.500 NPHI. CNAV -999.250 NRAT. CNAV -999.250 CRAT. CNAV NCNT. CNAV - 999. 250 FCNT. CNAV - 999. 250 CFTC. CNAV - 999. 250 CNTC. CNAV GRCH. CNTD 48. 813 TENS. CNTD 1400. 000 3. 995 4382. 475 -999.250 -999.250 ** END OF DATA ** **** FILE TRAILER **** FILE NAM~ : EDIT .004 SERVICE ' FLIC VERSION ' O01CO1 DATE ' 97/05/16 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .005 SERVICE · FLIC VERSION : O01CO1 DATE : 97/05/16 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : LIS Tape Verification Listing Schlumberger Alaska Computing Center 16-MAY-1997 10:40 PAGE: 17 FILE HEADER FILE NOPiBER 5 RAW CURVES Curves and log header data for each pass in separate files; raw background pass in last file PASS NUMBER: 1 DEPTH INCREMFJVT: 0.5000 FILE SUM~L~gY VENDOR TOOL CODE START DEPTH STOP DEPTH 9573.0 8955.0 CNTD LOG HEADER DATA DATE LOGGED: 3-APR-97 SOFTWARE VERSION: CP 39.116 TIME LOGGER ON BOTTOM: 2043 3-APR-97 TD DRILLER (FT) : 9553.0 TD LOGGER (FT) : 9555.0 TOP LOG INTERVAL (FT) : 8950.0 BOTTOM LOG INTERVAL (FT) : 9545.0 LOGGING SPEED (FPHR) : 1800.0 DEPTH CONTROL USED (YES/NO): NO TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NU~iBER GR GAMMA RAY CGRS CCL COLLAR LOCATOR CPSC-A 808 CNTD COMP.NEUTRON CNT-D 146 $ BOREHOLEAND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLERS CASING DEPTH (F~: LOGGERS CASING DEPTH (FT): BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE TEMPERATURE (DEGF) : BOTTOM HOLE TEMPERATURE (DEGF) : FLUID SALINITY (PPM) : FLUID LEVEL (FT) : FLUID RATE AT WELLHEAD (BPM) : WATER CUTS (PCT) : GAS~OIL RATIO: CHOKE (DEG) : NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): 9810.0 SEA WATER THERMAL SANDSTONE 2.65 8.5 LIS Tape Verification Listing Schlumberger Alaska Computing Center 16-MAY-1997 10:40 BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE TOP NORMALIZING WINDOW (FT) : BASE NORMALIZING WINDOW (FT) : BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (CPS): 0 FAR COUNT RATE HIGH SCALE (CPS): 4000 NEAR COUNT RATE LOW SCALE (CPS): 0 NEAR COUNT RATE HIGH SCALE (CPS): 20000 TOOL STANDOFF (IN): REM3LuJfS: TIED INTO SWS CBT DATED 1-7-83. PUMPED 150 BBLS SW, 30 BBLS DIESEL. WELL TOOK 4 HOURS TO SWAP OUT. GOC APPEARS TO BE AT 9398'. THIS FILE CONTAINS THE RAW CNTD DATA FOR PASS #1. $ LIS FORMAT DATA PAGE: 18 ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE- 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 44 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 23 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 560334 O0 000 O0 0 5 1 1 4 68 0000000000 NPHI PS1 PU 560334 O0 000 O0 0 5 1 1 4 68 0000000000 RTNR PS1 560334 O0 000 O0 0 5 1 1 4 68 0000000000 LIS Tape Verification Listing Schlumberger Alaska Computing Center 16-MAY-1997 10:40 PAGE: 19 NAFIE SERV UNIT SERVICE API API API API FILE NUMB ~]FIB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUM~ SAMP ELEM CODE (HEX) TNRA PS1 560334 O0 000 O0 0 5 1 1 4 68 0000000000 RCNTPS1 CPS 560334 O0 000 O0 0 5 1 1 4 68 0000000000 RCFT PS1 CPS 560334 O0 000 O0 0 5 1 1 4 68 0000000000 CNTC PS1 CPS 560334 O0 000 O0 0 5 1 1 4 68 0000000000 CFTC PS1 CPS 560334 O0 000 O0 0 5 1 1 4 68 0000000000 GR PS1 GAPI 560334 O0 000 O0 0 5 1 1 4 68 0000000000 TENS PS1 LB 560334 O0 000 O0 0 5 1 1 4 68 0000000000 CCL PS1 V 560334 O0 000 O0 0 5 1 1 4 68 0000000000 ** DATA ** DEPT. 9573.000 NPHI.PS1 22.994 RTNR.PS1 3.930 TNRA.PS1 4.155 RCNT. PS1 4307.692 RCFT. PS1 1096.154 CNTC. PS1 4374.197 CFTC. PSi 1052.760 GR.PS1 33.344 TENS.PSi 1015.000 CCL.PS1 0.030 DEPT. 8955.000 NPHI.PS1 53.364 RTNR.PS1 7.375 TNRA.PS1 RCNT. PS1 2025.751 RCFT. PS1 279.476 CNTC. PS1 2069.336 CFTC. PSi GR.PS1 33.344 TENS.PSi 1420.000 CCL.PS1 0.000 7.710 267.119 ** END OF DATA ** **** FILE TRAILER **** FILE NAM~ : EDIT .005 SERVICE : FLIC VERSION : O01CO1 DATE : 97/05/16 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .006 SERVICE : FLIC VERSION : O01CO1 DATE : 97/05/16 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUAIBER RAW CURVES LIS Tape Verification Listing Schlumberger Alaska Computing Center 16-MAY-1997 10:40 PAGE: 20 Curves and log header data for each pass in separate files; raw background pass in last file PASS NUMBER: 2 DEPTH INCREMENT: 0.5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH 9570.0 8954.0 CNTD LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME LOGGER ON BOTTOM: TD DRILLER (FT) : TD LOGGER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : LOGGING SPEED (FPPLR) : DEPTH CONTROL USED (YES/NO): TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE ......................... GR GAF~4A RAY CCL COLLAR LOCATOR CNTD COMP. NEUTRON $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN) : DRILLERS CASING DEPTH (FT) : LOGGERS CASING DEPTH (FT) : BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE TEMPERATURE (DEGF) : BOTTOM HOLE TEMPERATURE (DEGF): FLUID SALINITY (PPM) : FLUID LEVEL (FT) : FLUID RATE AT WELLHEAD (BPM): WATER CUTS (PCT) : GAS~OIL RATIO: CHOKE (DEG) : 1FEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): 3-APR-97 CP 39.116 2043 3-APR-97 9553.0 9555.0 8950.0 9545.0 1800.O NO TOOL NUMBER ........... CGRS CPSC-A 808 CNT-D 146 981 O. 0 SEA WATER THERMAL SANDSTONE 2.65 8.5 BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE TOP NORMALIZING WINDOW (FT) : BASE NORMALIZING WINDOW (FT) : LIS Tape Verification Listing Schlumberger Alaska Computing Center 16-MAY-1997 10:40 BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (CPS): 0 FAR COUNT RATE HIGH SCALE (CPS): 4000 NEAR COUNT RATE LOW SCALE (CPS): 0 NEAR_ COUNT RATE HIGH SCALE (CPS): 20000 TOOL STANDOFF (IN): REMARKS: TIED INTO SWS CBT DATED 1-7-83. PUMPED 150 BBLS SW, 30 BBLS DIESEL. WELL TOOK 4 HOURS TO SWAP OUT. GOC APPEARS TO BE AT 9398'. THIS FILE CONTAINS THE RAW CNTD DATA FOR PASS #2. $ LIS FORMAT DATA PAGE: 21 ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 44 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 23 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 560334 O0 000 O0 0 6 1 1 4 68 0000000000 NPHI PS2 PU 560334 O0 000 O0 0 6 1 1 4 68 0000000000 RTNR PS2 560334 O0 000 O0 0 6 1 1 4 68 0000000000 TNRA PS2 560334 O0 000 O0 0 6 1 1 4 68 0000000000 RCNTPS2 CPS 560334 O0 000 O0 0 6 1 1 4 68 0000000000 RCFT PS2 CPS 560334 O0 000 O0 0 6 1 1 4 68 0000000000 LIS Tape Verification Listing Schlumberger Alaska Computing Center 16-MAY-1997 10:40 PAGE: NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUM~ SAMP ELE~ CODE (HEX) CNTC PS2 CPS 560334 O0 000 O0 0 6 1 1 4 68 0000000000 CFTC PS2 CPS 560334 O0 000 O0 0 6 1 1 4 68 0000000000 GR PS2 GAPI 560334 O0 000 O0 0 6 1 1 4 68 0000000000 TENS PS2 LB 560334 O0 000 O0 0 6 1 1 4 68 0000000000 CCL PS2 V 560334 O0 000 O0 0 6 1 1 4 68 0000000000 22 ** DATA ** DEPT. 9570.000 NPHI.PS2 20.191 RTNR.PS2 3.574 TNRA.PS2 RCNT. PS2 4274.510 RCFT. PS2 1196.078 CNTC.PS2 4340.502 CFTC. PS2 GR.PS2 40.031 TENS.PS2 1110.000 CCL.PS2 0.013 DEPT. 8954.500 NPHI.PS2 53.488 RTArR.PS2 7.467 TNRA.PS2 RCNT. PS2 2026.201 RCFT. PS2 262.009 CNTC. PS2 1999.954 CFTC. PS2 GR.PS2 32.219 TENS. PS2 1365.000 CCL.PS2 0.000 3.779 1148.729 7. 724 268. 653 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .006 SERVICE : FLIC VERSION : O01CO1 DATE : 97/05/16 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAFiE : EDIT .007 SERVICE : FLIC VERSION : O01CO1 DATE : 97/05/16 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUM~ER 7 RAW CURVES Curves and log header data for each pass in separate files; raw background pass in last file PASS--ER: 3 DEPTH INCREMENT: 0.5000 LIS Tape Verification Listing Schlumberger Alaska Computing Center 16-MAY-1997 10:40 PAGE: 23 FILE SUF~4~hgY VENDOR TOOL CODE START DEPTH CNTD 9571.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME LOGGER ON BOTTOM: TD DRILLER (FT) : TD LOGGER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : LOGGING SPEED (FPHR): DEPTH CONTROL USED (YES/NO): TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE GR GAMMA RAY CCL COLLAR LOCATOR CNTD COMP. NEUTRON $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN) : DRILLERS CASING DEPTH (FT) : LOGGERS CASING DEPTH (FT): BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE TEMPERATURE (DEGF) : BOTTOM HOLE TEMPERATURE (DEGF) : FLUID SALINITY (PPM) : FLUID LEVEL (FT) : FLUID RATE AT WELLHEAD (BPM): WATER CUTS (PCT) : GAS~OIL RATIO: CHOKE (DEG) : NEUTRON TOOL STOP DEPTH .......... 8952.5 3 -APR- 97 CP 39.116 2043 3 -APR-97 9553.0 9555.0 8950.0 9545.0 1800.0 NO TOOL NUMBER CGRS CPSC-A 808 CNT-D 146 9810.0 SEA WATER TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN) '. THERMAL SANDSTONE 2.65 8.5 BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE TOP NORMALIZING WINDOW (FT): BASE NORMALIZING WINDOW (FT): BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (CPS): 0 LIS Tape Verification Listing Schlumberger Alaska Computing Center 16-MAY-1997 10:40 FAR COUNT RATE HIGH SCALE (CPS): 4000 NEAR COUNT RATE LOW SCALE (CPS): 0 NEAR COUNT RATE HIGH SCALE (CPS): 20000 TOOL STANDOFF (IN): REMARKS: TIED INTO SWS CBT DATED 1-7-83. PUMPED 150 BBLS SW, 30 BBLS DIESEL. WELL TOOK 4 HOURS TO SWAP OUT. GOC APPEARS TO BE AT 9398'. THIS FILE CONTAINS THE RAW CNTD DATA FOR PASS #3. $ LIS FORMAT DATA PAGE: 24 ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 44 4 66 1 $ 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 23 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUFIB SAMP ELEM CODE (HEX) DEPT FT 560334 O0 000 O0 0 7 1 1 4 68 0000000000 NPHI PS3 PU 560334 O0 000 O0 0 7 1 1 4 68 0000000000 RTNR PS3 560334 O0 000 O0 0 7 1 1 4 68 0000000000 TNRA PS3 560334 O0 000 O0 0 7 1 1 4 68 0000000000 RCNTPS3 CPS 560334 O0 000 O0 0 7 1 1 4 68 0000000000 RCFT PS3 CPS 560334 O0 000 O0 0 7 1 1 4 68 0000000000 CNTC PS3 CPS 560334 O0 000 O0 0 7 1 1 4 68 0000000000 CFTC PS3 CPS 560334 O0 000 O0 0 7 1 1 4 68 0000000000 GR PS3 GAPI 560334 O0 000 O0 0 7 1 1 4 68 0000000000 LIS Tape Verification Listing Schlumberger Alaska Computing Center 16-MAY-1997 10:40 PAGE: NA~E SERV UNIT SERVICE API API API API FILE ~ NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUAIB SAMP ELE~ CODE (HEX) TENS PS3 LB 560334 O0 000 O0 0 7 1 1 4 68 0000000000 CCL PS3 V 560334 O0 000 O0 0 7 1 1 4 68 0000000000 25 ** DATA ** DEPT. 9571.000 NPHI.PS3 21.916 RTNR.PS3 3.793 TNRA.PS3 RCNT.PS3 4141.177 RCFT. PS3 1091.765 CNTC.PS3 4205.110 CFTC. PS3 GR.PS3 35.250 TENS.PS3 800.000 CCL.PS3 0.026 DEPT. 8952.500 NPHI.PS3 52.899 RTNR.PS3 6.875 TNRA. PS3 RCNT. PS3 2026.667 RCFT. PS3 285.078 CNTC.PS3 2024.987 CFTC. PS3 GR.PS3 30.172 TENS.PS3 1435.000 CCL.PS3 0.119 4.010 1048.545 7. 656 266. 348 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .007 SERVICE : FLIC VERSION : O01CO1 DATE : 97/05/16 MAX P~EC SIZE : 1024 FILE TYPE : LO LAST FILE : **** TAPE TRAILER **** SERVICE NA~E : EDIT DATE : 97/05/16 ORIGIN : FLIC TAPE NAME : 97196 CONTINUATION # : 1 PREVIOUS TAPE COA~4F~Ff : BP EXPLORATION, PRUDHOE BAY, H-18, API #50-029-20880-00 **** REEL TRAILER **** SERVICE NAFIE : EDIT DATE : 97/05/16 ORIGIN : FLIC REEL NAME : 97196 CONTINUATION # : PREVIOUS REEL : COMFiFJTf : BP EXPLORATION, PRUDHOE BAY, H-18, API #50-029-20880-00 BP Exploration Alaska Inc Well: H-18 Field: PRUDHOE BAY UNIT North Slope, Alaska, USA Report Production Log Analysis Prepared For : BP Exploration Alaska Inc Logging Date : 30th September, 2014 Report Date : 7th October, 2014 Submitted by: Farrukh Hamza Phone: +1(281)871-3048 10200 Bellaire Blvd, Houston, Texas-77072 Email: farrukh.hamza@halliburton.com HALLIBURTON DOES NOT GUARANTEE THE ACCURACY OF ANY INTERPRETATION OF THE LOG DATA, CONVERSION OF LOG DATA TO PHYSICAL ROCK PARAMETERS OR RECOMMENDATIONS WHICH MAY BE GIVEN BY HALLIBURTON PERSONNEL OF WHICH APPEAR ON THE LOG OR IN ANY OTHER FORM. ANY USER OF SUCH DATA, INTERPRETATIONS, CONVERSIONS OF RECOMMENDATIONS AGREES THAT HALLIBURTON IS NOT RESPONSIBLE EXCEPT WHERE DUE TO GROSS NEGLIGENCE OR WILLFUL MISCONDUCT, FOR ANY LOSS, DAMAGES, OR EXPENSES RESULTING FROM THE USE THEREOF BP Exploration Alaska Production Array Log Analysis 1 TABLE OF CONTENTS 1.0 EXECUTIVE SUMMARY ....................................................................................................................... 2 2.0 BACKGROUND AND OBJECTIVES ..................................................................................................... 3 3.0 WELL INFORMATION AND DATA QUALITY ASSESSMENT ......................................................... 4 4.0 PRODUCTION LOG PROCESSING ...................................................................................................... 7 4.1 FLOWING SURVEY ................................................................................................................................ 9 BP Exploration Alaska Production Array Log Analysis 2 1.0 EXECUTIVE SUMMARY Production logging was done in Well H-18 on September 30, 2014 in flowing conditions with the objective to allocate oil, gas and water in producing zones and determine whether squeezed perforations are producing. In order to accurately quantify the flow of fluids, a production logging suite was run. The flowing PL analysis showed 78% of the oil production to be coming from 9448.5’ – 9458’ while the remaining from 9458’– 9467’. Majority (96%) of the gas production is coming from 9391.5’ – 9448.5. Zone from 9497.5’ – 9539.5’ contributed all the water production. The status of each perforation is indicated in the table below. The interpreted production rates are slightly lower than the reported flow rates. Perforations Water Rate Oil Rate Gas Rate From, ft To, ft Status STB/D % STB/D % Mscf/D % 9391.5 9448.5 Squeezed 0 0 0 0 22900 96 9448.5 9458 Squeezed 0 0 585 78 209 1 9458 9467 50% Squeezed 0 0 167 22 63 0 9477.5 9495 Squeezed 0 0 0 0 702 3 9497.5 9539.5 Open 2027 100 0 0 1 0 2027 752 23875 BP Exploration Alaska Production Array Log Analysis 3 2.0 BACKGROUND AND OBJECTIVES The objective for running the PL was to allocate oil, gas and water in producing zones and determine whether squeezed perforations are producing. BP Exploration Alaska Production Array Log Analysis 4 3.0 WELL INFORMATION AND DATA QUALITY ASSESSMENT Well H-18 is completed with 7” production liner across which the production log was run. The wellbore schemat ic is presented in the Figure 1. The tool string diagram used for the PL logged is presented in Figure 2. The tool string consisted of the following production logging sensors: Gamma Ray - Casing Collar Locator – Pressure - Gas holdup – Caliper – Radioactive Density –Capacitance Water Holdup – Inline Spinner – Temperature – Caged Fullbore Spinner. The data quality is summarized below TOOL USAGE LOG DESCRIPTION LOG QUALITY REMARKS WELL BORE PARAMETERS QP Well bore pressure Good TEMP Well bore temperature Good FLUID TYPE FDR Radioactive density tool uses radioactive source and detector to measure density and is a center sample device Good CWH Uses capacitance to measure the differences between hydrocarbons and water Good Used qualitatively in the interpretation GHT Gas HoldUp Tool Good FLUID VELOCITY CFS Caged Fullbore Spinner Good Plato allows the use of only ILS or CFS, not both. ILS was used. ILS Inline Spinner Good . BP Exploration Alaska Production Array Log Analysis 5 Figure 1: Wellbore Schematic BP Exploration Alaska Production Array Log Analysis 6 Figure 2: Production Log Toolstring BP Exploration Alaska Production Array Log Analysis 7 4.0 PRODUCTION LOG PROCESSING The production log data from the flowing were processed using the PLATO software. The software uses a global probabilistic method for the production log analysis. In this method, known as the Maximum Likelihood method, a well flow model is compared to all available data and improved, by optimization, until the best possible match with the data is obtained. By using this method the result is the most likely interpretation. A comparison between the model and the data is shown in this report and allows t he analyst or the reader to determine validity of the answer obtained. Potential sources of discrepancies include tool measurement errors, conflicts between the parameters or conditions that make the underlying empirical models (such as flow regimes) less applicable.  The flow regimes were determined, directly from the flow rates and holdups, according to the Taitel- Dukler analytic model.  The profile factors, to calculate the true fluid velocity from the apparent velocity, were based on the Reynolds numbers.  Solution gas in oil was derived from the correlations (Vasquez-Beggs or Øistein- Glaso). The analysis was performed in five steps:  The data preparation to filter the data, compute gradients and error estimates.  The flow meter analysis to compute the apparent velocity.  The profile determination to identify the potential producing and/or injecting zones.  The computation of the flow rates by global optimization.  The computation of surface productions and reporting. BP Exploration Alaska Production Array Log Analysis 8 The water density and viscosity were calculated using a salinity of 20,000 ppm. The Craft & Hawkins correlation was used. The oil density and viscosity were calcula ted using an oil gravity of 32 API. The Vasquez & Beggs correlation was used to calculate the solution gas. Viscosity was calculated using the Beggs & Robinson correlation. The Pc and Tc parameters were calculated using the Brown et al. correlation. The gas viscosity was calculated using the Lee Gonzales Eakin correlation. The following gas parameters were used: GasType Miscellaneous SPGG UNITY .750 GP-CO2 UNITY 0 GP-H2S UNITY 0 GP-Nitrogen UNITY 0 Utilizing the above fluid information, measured down hole oil density, temperature & pressure, the following fluid properties were calculated at well conditions: Depth Twf Pwf Bwater waterwaterBoil oiloilRsb Bgas gasgas feet °F psi UNITY g/cc cP UNITY g/cc cP ft3/bbl UNITY g/cc cP 9320 212 2356 1.03 0.981 0.304 1.21 0.765 0.843 377 0.00723 0.127 0.0181 9344.5 212 2358 1.03 0.98 0.304 1.21 0.765 0.842 377 0.00723 0.127 0.0181 9369 212 2366 1.03 0.981 0.304 1.21 0.765 0.843 379 0.0072 0.127 0.0181 9393.5 212 2372 1.03 0.981 0.304 1.21 0.765 0.843 380 0.00719 0.128 0.0181 9418 212 2377 1.03 0.981 0.304 1.21 0.764 0.841 381 0.00717 0.128 0.0181 9443 211 2378 1.03 0.981 0.305 1.21 0.765 0.846 381 0.00716 0.128 0.0181 9467.5 223 2382 1.04 0.976 0.286 1.05 0.827 2.52 375 0.00736 0.125 0.0181 9492 223 2389 1.04 0.976 0.286 1.05 0.827 2.52 376 0.00733 0.125 0.0182 9516.5 223 2400 1.04 0.976 0.285 1.21 0.763 0.817 378 0.00731 0.126 0.0182 9541 223 2405 1.04 0.976 0.285 1.05 0.827 2.52 379 0.00729 0.126 0.0182 To estimate the flow rates, the caliper log recorded during the UP and DOWN passes was used to estimate the nominal ID throughout the log. Tool information The following capacitance tool characteristics were used HydroWater Hz 27300 (Downhole measurement) HydroHyd Hz 33018 (Surface Calibration) The following gas holdup tool characteristics were used GasHoldupWater Hz 40000 (Downhole measurement) GasHoldupGas Hz 14414 (Surface Calibration) BP Exploration Alaska Production Array Log Analysis 9 4.1 FLOWING SURVEY The raw data from the flowing survey are presented in the Figures 3 and 4. For the interpretation, all the passes have been used. For spinner analysis, DOWN passes were excluded. From the raw data, various trends can be observed. Almost all the gas production is coming from 9391.5’ to 9448.5’ (CFS, ILS and capacitance increase, density log values decrease to about 0.16 g/cc and gas holdup values drop significantly). The inline and fullbore spinners move steadily across the bottom perforations indicating some flow while density stays around 1 g/cc indicating water production. Capacitance data is also responsive, for example, increasing significantly across the large gas production. From the spinner response, the velocity profile was estimated using the slopes calculated from the spinner calibration (Figure 5). The estimated spinner velocities, densit y and gas holdup are used to calculate the flow profile. The final flow profile, after global optimization, along with the comparison of the measured and theoretical tool values are presented in Figure 7. The production rates at surface conditions estimat ed from the production log analysis are presented in Figure 8 and are summarized in the table below: Perforations Q- Water Qp- Water Q-Oil Qp-Oil Q-Gas Qp-Gas From, ft To, ft Status BFPD BFPD BFPD BFPD MCFD MCFD 9391.5 9448.5 Squeezed 2027 0 752 0 23875 22900 9448.5 9458 Squeezed 2027 0 752 585 975 209 9458 9467 50% Squeezed 2027 0 167 167 766 63 9477.5 9495 Squeezed 2027 0 0 0 703 702 9497.5 9539.5 Open 2027 2027 0 0 1 1 BP Exploration Alaska Production Array Log Analysis 10 Raw Data  The figure below summarizes the input data recorded at the well site during flowing passes.  Each pass is shown with a fixed predefined color. Figure 3: Input data from the conventional production logging sensors BP Exploration Alaska Production Array Log Analysis 11 Pre- Processing Figure 4: All the passes have been used in the interpretation BP Exploration Alaska Production Array Log Analysis 12 Calibration of Spinner Data The spinner was analyzed to calculate the apparent velocity at each depth. The figure shows a comparison between the flowmeter data and the flowmeter values calculate d for each cable speed, with the globally determined slope and intercept. Only UP ILS passes have been used. For each cable speed a different color is used. The data is shown as solid lines and the calculated values in dotted lines. Figure 5: Velocity pro file from spinner data BP Exploration Alaska Production Array Log Analysis 13 The image below displays cross plots for the Inline spinner. The estimated slopes are used for converting the spinner response to flow velocities. Figure 6: Spinner cross plot BP Exploration Alaska Production Array Log Analysis 14 Flow Profile The quantitative production rates were determined by comparing the well flow model with all available data. The figure below is provided to verify the agreement of the flow model with the data. In this figure the data is represented by the blue curves, while the calculated tool values are shown in red. The uncertainty interval is represented as a gray band around the data. The uncertainty interval corresponds to one standard deviation. Capacitance is used qualitatively. The small fluctuations around the data are to be expected, since the tools have intrinsic errors. Large sustained discrepancies indicate problems with the data, conflicts between parameters or conditions that make the underlying empirical models less applicable. To the right of the figure the flow regimes are shown. Within the transition zones several regimes can exists intermittently. Figure 7: Flow profile at reservoir conditions BP Exploration Alaska Production Array Log Analysis 15 The production rates at surface conditions are presented in the figure below: Figure 8: Flow profile at surface conditions