Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout210-011Originated: Delivered to:3-Jul-25Alaska Oil & Gas Conservation Commiss03Jul25-NR        !"#$$%$ !&$$'($)*%+ ($)*%,-.WELL NAME API #SERVICE ORDER #FIELD NAMESERVICE DESCRIPTIONDELIVERABLE DESCRIPTION DATA TYPE DATE LOGGED3S-705 50-103-20915-00-00 225-047 Kuparuk River WL TTiX IBC FINAL FIELD 20-Jun-252K-23 50-103-20125-00-00 190-014 Kuparuk River WL Hex Plug FINAL FIELD 25-Jun-252L-304 50-103-20613-00-00 210-011 Kuparuk River WL Pressure-Temp Log FINAL FIELD 26-Jun-251B-04 50-029-20595-00-00 181-065 Kuparuk River WL IPROF FINAL FIELD 28-Jun-25Transmittal Receipt//////////////////////////////// 0/////////////////////////////////  +  !  1 Please return via courier or sign/scan and email a copy to Schlumberger." 2"3 +45 %TRANSMITTAL DATETRANSMITTAL #1 67 8 " !  - +"  8#!(3 . 8 ) "3   8#!9 3   :   8"    +868 8  " 8#!;"   "  3 -  3 "  3""+      3   + < +3!%  T40638T40639T40640T406412L-30450-103-20613-00-00210-011Kuparuk RiverWLPressure-Temp LogFINAL FIELD26-Jun-25Gavin GluyasDigitally signed by Gavin Gluyas Date: 2025.07.09 09:20:13 -08'00' STATE OF ALASKA OIL AND GAS CONSERVATION COMMISSION BOPE Test Report for: Reviewed By: P.I. Suprv Comm ________KUPARUK RIV U TARN 2L-304 JBR 05/01/2025 MISC. INSPECTIONS: FLOOR SAFTY VALVES:CHOKE MANIFOLD:BOP STACK: ACCUMULATOR SYSTEM:MUD SYSTEM: P/F P/F P/FP/FP/F Visual Alarm QuantityQuantity Time/Pressure SizeQuantity Number of Failures:1 3-1/2" TJ, Manual kill fail - Grease/cycle pass. 11 Accumulator bottles avg. precharge 1000psi. BOP Misc.: 2 each 2 1/16” 5K gate valves on test spool located on BOP stack below the lower rams. Choke Misc.: 3” Demco valve located on the downstream of the manifold. Test Results TEST DATA Rig Rep:Hansen/DominguezOperator:ConocoPhillips Alaska, Inc.Operator Rep:Barr/Erdman Rig Owner/Rig No.:Nordic 3 PTD#:2100110 DATE:4/2/2025 Type Operation:WRKOV Annular: 250/2500Type Test:INIT Valves: 250/2500 Rams: 250/2500 Test Pressures:Inspection No:bopKPS250403135413 Inspector Kam StJohn Inspector Insp Source Related Insp No: INSIDE REEL VALVES: Quantity P/F (Valid for Coil Rigs Only) Remarks: Test Time 7.5 MASP: 1766 Sundry No: 325-046 Control System Response Time (sec) Time P/F Housekeeping:P PTD On Location P Standing Order Posted P Well Sign P Hazard Sec.P Test Fluid W Misc NA Upper Kelly 1 P Lower Kelly 1 P Ball Type 2 P Inside BOP 1 P FSV Misc 0 NA 12 PNo. Valves 1 PManual Chokes 1 PHydraulic Chokes 1 PCH Misc Stripper 0 NA Annular Preventer 1 13-5/8"P #1 Rams 1 2-7/8" x 5-1/2 P #2 Rams 1 Blinds P #3 Rams 1 2-7/8" x 5-1/2 NT #4 Rams 0 NA #5 Rams 0 NA #6 Rams 0 NA Choke Ln. Valves 1 3-1/8"P HCR Valves 2 3-1/8"P Kill Line Valves 2 3-1/8" & 3'FP Check Valve 0 NA BOP Misc 2 2-1/16"P System Pressure P3000 Pressure After Closure P1750 200 PSI Attained P19 Full Pressure Attained P101 Blind Switch Covers:PAll Stations Bottle precharge P Nitgn Btls# &psi (avg)P4@1825 ACC Misc NA0 P PTrip Tank P PPit Level Indicators P PFlow Indicator P PMeth Gas Detector P PH2S Gas Detector NA NAMS Misc Inside Reel Valves 0 P Annular Preventer P17 #1 Rams P5 #2 Rams P5 #3 Rams NA0 #4 Rams NA0 #5 Rams NA0 #6 Rams NA0 HCR Choke P1 HCR Kill P1 9 9 9 99999 9 9 9 9 Manual kill fail FPKill Line Valves 1. Operations Susp Well Insp Plug Perforations Fracture Stimulate Pull Tubing Operations shutdown Performed: Install Whipstock Perforate Other Stimulate Alter Casing Change Approved Program Mod Artificial Lift Perforate New Pool Repair Well Coiled Tubing Ops Other: Replace Tubing Development Exploratory Stratigraphic Service 6. API Number: 7. Property Designation (Lease Number):8. Well Name and Number: 9. Logs (List logs and submit electronic data per 20AAC25.071):10. Field/Pool(s): 11. Present Well Condition Summary: Total Depth measured 14340'feet 13791'feet true vertical 5687' feet None feet Effective Depth measured 14042'feet 13747'feet true vertical 5508'feet 5342'feet Perforation depth Measured depth True Vertical depth Tubing (size, grade, measured and true vertical depth)3-1/2" 3-1/2" L-80 L-80 13736' 13800' 5336' 5371' Packers and SSSV (type, measured and true vertical depth)13747' 5342' 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13a. Prior to well operation: Subsequent to operation: 13b. Pools active after work:Tarn Oil Pool 15. Well Class after work: Daily Report of Well Operations Exploratory Development Service Stratigraphic Copies of Logs and Surveys Run 16. Well Status after work: Oil Gas WDSPL Electronic Fracture Stimulation Data GSTOR GINJ SUSP SPLUG Sundry Number or N/A if C.O. Exempt: Authorized Name and Digital Signature with Date:Contact Name: Contact Email: Authorized Title:Contact Phone: 4297'2399' Burst Collapse Production 14305' Casing 5681'14331' 4268' 108'Conductor Surface 16" 10-3/4" 80' measured TVD 7-5/8" STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS 210-011 50-103-20613-00-00 P.O. Box 100360 Anchorage, AK 99510 3. Address: ConocoPhillips Alaska, Inc. N/A 5. Permit to Drill Number:2. Operator Name N 4. Well Class Before Work: ADL0025603, ADL00380051, ADL0380052 Kuparuk River Field/ Tarn Oil Pool KRU 2L-304 Plugs Junk measured Length measured true vertical Packer Representative Daily Average Production or Injection Data Casing Pressure Tubing Pressure 14. Attachments (required per 20 AAC 25.070, 25.071, & 25.283) N/A Gas-Mcf MDSize 108' Well Shut-In 325-046 Sr Pet Eng:Sr Pet Geo:Sr Res Eng: WINJ WAG Water-BblOil-Bbl 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. N/A Packer: BAKER FHL SSSV: None Elliott Tuttle elliott.tuttle@conocophillips.com (907) 263-4742RWO Engineer 14000-14020' 5483-5495' Fra O s 6. A PG , C g Form 10-404 Revised 10/2022 Due Within 30 days of Operations Submit in PDF format to aogcc.permitting@alaska.gov By Grace Christianson at 10:35 am, May 07, 2025 Digitally signed by Elliott Tuttle Reason: I am approving this document Location: Anchorage Tower, CoP Date: 2025.05.06 13:43:14-08'00' Elliott Tuttle DSR-5/8/25JJL 5/8/25 RBDMS JSB 051525 Page 1/5 2L-304 Report Printed: 4/29/2025 Operations Summary (with Timelog Depths) Job: RECOMPLETION Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 3/29/2025 14:00 3/30/2025 00:00 10.00 MIRU, MOVE MOB P Mob sub towards 2L. 3/30/2025 00:00 3/30/2025 10:00 10.00 MIRU, MOVE MOB P Mob rig T/ 2L. 3/30/2025 10:00 3/30/2025 14:00 4.00 MIRU, MOVE MOB P Hang tree in the cellar. Lay herculite & mats. Spot sub over well 304. Berm in rig. Safe out stairs. 3/30/2025 14:00 3/31/2025 00:00 10.00 MIRU, MOVE MOB T Rig repair. Cut out MM #4, 4" Demco valve on mud manifold. Install new rotary table. 3/31/2025 00:00 4/1/2025 00:00 24.00 MIRU, MOVE RGRP T Rig repair. Cut out MM #4, 4" Demco valve on mud manifold. Start welding in new valve. Welder timed out. Sent to bed. Processing 3 1/2" EUE TBG. 4/1/2025 00:00 4/1/2025 12:00 12.00 MIRU, MOVE RGRP T Rig repair. Cut out MM #6, 4" Continue replace Demco valve on mud manifold. Processing 3 1/2" EUE TBG. 0.0 0.0 4/1/2025 12:00 4/2/2025 00:00 12.00 MIRU, MOVE RGRP T Continue with repairs to #6, 4" valve on stand pipe 18:00 - Passing x-ray on welds, re- assemble valves for PT 23:00 - Attempt pressure test, found leaking o-rings on valves and hammer union 00:00 - Passing 5000 psi test on hard line and stand pipe valve 0.0 0.0 4/2/2025 00:00 4/2/2025 01:30 1.50 MIRU, WELCTL RURD P Rig up to circulate seawater into well 0.0 0.0 4/2/2025 01:30 4/2/2025 02:00 0.50 MIRU, WELCTL PRTS P PT lines 250/2500 psi from pumps to TT // Get initial well pressures T= 0 psi IA= 0 psi OA= 20 psi 0.0 0.0 4/2/2025 02:00 4/2/2025 05:00 3.00 MIRU, WELCTL KLWL P Pump 35 bbls 8.6 ppg deep clean pill followed by 632 bbls 8.6# seawater // Pump 4 bpm @ 800 psi 0.0 0.0 4/2/2025 05:00 4/2/2025 05:45 0.75 MIRU, WELCTL OWFF P OWFF, 30 Min no flow. 0.0 0.0 4/2/2025 05:45 4/2/2025 06:00 0.25 MIRU, WELCTL MPSP P Set HP BPV. 0.0 0.0 4/2/2025 06:00 4/2/2025 06:30 0.50 MIRU, WELCTL PRTS P PT BPV from below T/ 1000 PSI for 10 Min. 0.0 0.0 4/2/2025 06:30 4/2/2025 07:00 0.50 MIRU, WHDBOP RURD P B/D, R/D circ equipment. 0.0 0.0 4/2/2025 07:00 4/2/2025 10:00 3.00 MIRU, WHDBOP NUND P N/D tree, inspct hanger neck threads. Function LDS. Install test dart. Instll compression fitting in hanger on chemical injection line. Cap injection line. 0.0 0.0 4/2/2025 10:00 4/2/2025 13:00 3.00 MIRU, WHDBOP NUND P N/U BOP. Install flow nipple. Hook up trip line. Grease equipment. 0.0 0.0 4/2/2025 13:00 4/2/2025 14:00 1.00 MIRU, WHDBOP RURD P R/U testing equipment. Fill BOPE w/ fresh water. 0.0 0.0 Rig: NORDIC 3 RIG RELEASE DATE 4/9/2025 Page 2/5 2L-304 Report Printed: 4/29/2025 Operations Summary (with Timelog Depths) Job: RECOMPLETION Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 4/2/2025 14:00 4/2/2025 22:00 8.00 MIRU, WHDBOP BOPE P Initial BOPE test, Tested BOPE at 250/2500 PSI for 5 Min each, Tested annular, UVBR's, w/ 3 1/2". Test blinds rams. Choke valves #1 to #13, upper and lower top drive well control valves. Test 3 1/2" IF FOSV and IBOP. Test 3 ½” EUE FOSV. Test 2" rig floor Demco kill valve MM #13. Test manual and HCR kill valves & manual and HCR choke valves. Test two ea 2 1/6" gate auxiliary valves below LPR. Test hydraulic and manual choke valves to 1500 PSI and demonstrate bleed off. Perform accumulator test. Initial pressure=3000 PSI, after closure=1750 PSI, 200 PSI attained =19 sec, full recovery attained =101 sec. UVBR's= 5 sec, LVBR’s= N/A sec. Annular= 17 sec. Simulated blinds= 5 sec. HCR choke & kill= 1 sec each. 4 back up nitrogen bottles average =1825 PSI. Test gas detectors, PVT and flow show. Test witnessed by AOGCC rep Kam StJohn. F/P Manual Kill Valve 0.0 0.0 4/2/2025 22:00 4/2/2025 23:00 1.00 COMPZN, RPCOMP CLEN P Rig down test equipment, clean and prep floor for pulling completion tubing 0.0 0.0 4/2/2025 23:00 4/3/2025 00:00 1.00 COMPZN, RPCOMP THGR P Pull test dart and H-BPV, Pick up landing jt, make up to hanger // BOLDS, pull hanger to floor 125K off seat drag 110K 13,710.0 13,680.0 4/3/2025 00:00 4/3/2025 01:00 1.00 COMPZN, RPCOMP RURD P Rig up Baker control line spooler 13,680.0 13,680.0 4/3/2025 01:00 4/3/2025 13:30 12.50 COMPZN, RPCOMP PULL P Pull completion tubing from Cut @ 13,710' racking back tubing in derrick, PUW-110K. Laying down jewelry T/ 6510. All clamps recovered. 13,680.0 6,510.0 4/3/2025 13:30 4/3/2025 14:30 1.00 COMPZN, RPCOMP RURD P R/D Baker spooling unit. Run rope through sheave and secure. 6,510.0 6,510.0 4/3/2025 14:30 4/3/2025 19:30 5.00 COMPZN, RPCOMP PULL P Rack back 3 1/2" completion F/ 6510' T/ surface, L/D jewelry. PUW=60K. Seal assembly recovered due to cut not completely made with Welltec cutter 6,510.0 0.0 4/3/2025 19:30 4/3/2025 21:00 1.50 COMPZN, RPCOMP CLEN P Clean and clear rig floor, strap all jewelry laid down 0.0 0.0 4/3/2025 21:00 4/3/2025 23:00 2.00 COMPZN, RPCOMP BHAH P Swap out BHA components make up to bottom of tubing string 0.0 26.0 4/3/2025 23:00 4/3/2025 23:30 0.50 COMPZN, RPCOMP SVRG P Service elevators 26.0 26.0 4/3/2025 23:30 4/4/2025 00:00 0.50 COMPZN, RPCOMP TRIP P Trip in hole with BHA# 1 mule shoe and casing scraper on bottom of tubing string 26.0 150.0 4/4/2025 00:00 4/4/2025 05:15 5.25 COMPZN, RPCOMP TRIP P TIH w/ BHA# 1 T/ 10,013', PUW=80K, SOW=55K' 150.0 10,013.0 4/4/2025 05:15 4/4/2025 08:00 2.75 COMPZN, RPCOMP SLPC P Crew change out. Slip & cut 66'' of drill line. 10,013.0 10,013.0 4/4/2025 08:00 4/4/2025 11:00 3.00 COMPZN, RPCOMP TRIP P Cont. TIH F/ 10013' T/ 13661'. PUW=97K, 63K. 10,013.0 13,661.0 4/4/2025 11:00 4/4/2025 12:15 1.25 COMPZN, RPCOMP WASH P Wash in hole F/ 13661' T/ 13744' @ 4 BPM, 450 PSI. Fully locate. 13,661.0 13,744.0 Rig: NORDIC 3 RIG RELEASE DATE 4/9/2025 Page 3/5 2L-304 Report Printed: 4/29/2025 Operations Summary (with Timelog Depths) Job: RECOMPLETION Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 4/4/2025 12:15 4/4/2025 14:30 2.25 COMPZN, RPCOMP CIRC P Circ hi-vis pill around @ xx BPM, 770 PSI. L/D single T/ 13717'.' 13,744.0 13,717.0 4/4/2025 14:30 4/4/2025 15:15 0.75 COMPZN, RPCOMP RURD P B/D TD. R/U testing equipment. 13,717.0 13,717.0 4/4/2025 15:15 4/4/2025 16:00 0.75 COMPZN, RPCOMP PRTS P Combo PT 7" CSG & CA-2 plug T/ 2500 PSI for 10 Min. 13,717.0 13,717.0 4/4/2025 16:00 4/4/2025 16:30 0.50 COMPZN, RPCOMP RURD P B/D, R/D testing equipment. 13,717.0 13,717.0 4/4/2025 16:30 4/5/2025 00:00 7.50 COMPZN, RPCOMP PULD P L/D TBG F/ 13717' T/4200'. PUW=xxK. 13,717.0 4,200.0 4/5/2025 00:00 4/5/2025 03:45 3.75 COMPZN, RPCOMP PULL P Lay down tubing F/ 4,200' 4,200.0 26.0 4/5/2025 03:45 4/5/2025 04:15 0.50 COMPZN, RPCOMP BHAH P Lay down scraper and mule shoe 26.0 0.0 4/5/2025 04:15 4/5/2025 04:45 0.50 COMPZN, RPCOMP OTHR P Pull wear ring 0.0 0.0 4/5/2025 04:45 4/5/2025 07:00 2.25 COMPZN, RPCOMP RURD P Stage salamander equipment for lift of heater cable. Crew change out. Load completion equipment in shed. 0.0 0.0 4/5/2025 07:00 4/5/2025 07:30 0.50 COMPZN, RPCOMP SFTY P PJSM w/ Salamander, Baker & rig crew on R/U sheaves & wire. 0.0 0.0 4/5/2025 07:30 4/5/2025 13:30 6.00 COMPZN, RPCOMP RURD P Un bland heater cable. Pull to rig on ground. Run through sheave. Lift sheave w/ wire in it. Hang sheave in derrick. Pull heater line down T/ RF & secure. Load Baker thermo-coupler spooler to RF. 0.0 0.0 4/5/2025 13:30 4/5/2025 14:00 0.50 COMPZN, RPCOMP RURD P Verify joint count & jewelry running order. 0.0 0.0 4/5/2025 14:00 4/5/2025 14:30 0.50 COMPZN, RPCOMP SFTY P PJSM on running 3 1/2" completion 0.0 0.0 4/5/2025 14:30 4/5/2025 17:30 3.00 COMPZN, RPCOMP PUTB P Run 3 1/2", 9.3#, L-80, EUE-M completion as per tally. Run in to Jt 235 for heater cable install 0.0 2,740.0 4/5/2025 17:30 4/5/2025 18:30 1.00 COMPZN, RPCOMP SVRG P Service power tongs, Nordic 3 rig service 2,740.0 2,740.0 4/5/2025 18:30 4/5/2025 23:30 5.00 COMPZN, RPCOMP PUTB P Run 3 1/2", 9.3#, L-80, EUE-M completion as per tally. 2,740.0 7,428.0 4/5/2025 23:30 4/6/2025 00:00 0.50 COMPZN, RPCOMP SFTY P PJSM with spoolers and salamander rep for running heater cable 7,428.0 7,428.0 4/6/2025 00:00 4/6/2025 05:00 5.00 COMPZN, RPCOMP PUTB P Run 3 1/2", 9.3#, L-80, EUE-M completion as per tally. T' 8466'. SOW=55K 7,428.0 8,461.0 4/6/2025 05:00 4/6/2025 06:00 1.00 COMPZN, RPCOMP OTHR P Test wire integrity. Crew change. 8,461.0 8,461.0 4/6/2025 06:00 4/6/2025 06:30 0.50 COMPZN, RPCOMP SFTY P PJSM w/ Salamander, Baker & rig crew on running completion w/ wire. 8,461.0 8,461.0 4/6/2025 06:30 4/6/2025 07:00 0.50 COMPZN, RPCOMP RURD P String thermo coupling #3 over sheave. 8,461.0 8,461.0 4/6/2025 07:00 4/6/2025 10:30 3.50 COMPZN, RPCOMP PUTB P Cont run 3 1/2" EUE F/ 8466' as pet tally. Install thermocouple #3 @ 8471'. Run T/ 9495'; SOW=60K. 8,461.0 9,495.0 4/6/2025 10:30 4/6/2025 11:00 0.50 COMPZN, RPCOMP BHAH P Test wire integrity. 9,495.0 9,495.0 4/6/2025 11:00 4/6/2025 13:00 2.00 COMPZN, RPCOMP PUTB P Cont run 3 1/2" EUE F/ 9495' T/ 10434'; SOW=64K. 9,495.0 10,434.0 4/6/2025 13:00 4/6/2025 13:30 0.50 COMPZN, RPCOMP OTHR P Test wire integrity. 10,434.0 10,434.0 4/6/2025 13:30 4/6/2025 15:00 1.50 COMPZN, RPCOMP PUTB P Cont run 3 1/2" EUE F/ 10434' T/11374; SOW=65K. 10,434.0 11,374.0 Rig: NORDIC 3 RIG RELEASE DATE 4/9/2025 Page 4/5 2L-304 Report Printed: 4/29/2025 Operations Summary (with Timelog Depths) Job: RECOMPLETION Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 4/6/2025 15:00 4/6/2025 15:30 0.50 COMPZN, RPCOMP OTHR P Test wire integrity. 11,374.0 11,374.0 4/6/2025 15:30 4/7/2025 00:00 8.50 COMPZN, RPCOMP PUTB P Cont run 3 1/2" EUE F/ 11374 T/ 12314' SOW=64K. PUW 103k tag PBR @ 13736' 11,374.0 13,736.0 4/7/2025 00:00 4/7/2025 01:00 1.00 COMPZN, RPCOMP HOSO P Attempt to work seals into PBR 50-60k down wt no progress , check wires for proper function found TC3 not reading temp, all other wires functioning properly 13,736.0 13,736.0 4/7/2025 01:00 4/7/2025 06:00 5.00 COMPZN, RPCOMP CIRC P Pump 2% lubes into system wait for lube to be delivered. Pump 2% STB + 10 Bbls. 13,736.0 13,736.0 4/7/2025 06:00 4/7/2025 07:45 1.75 COMPZN, RPCOMP PUTB P RIH fully identify PSI spike @ 13736', cont in PSI holding @ 13746. P/U attempt again could not pass 13743'. PSI holding. P/U circ increase lube T/ 2% with vis. 13,736.0 13,743.0 4/7/2025 07:45 4/7/2025 10:00 2.25 COMPZN, RPCOMP CIRC P Cont circ 2% lube 776 w/ vis around hole @ 3.5 BPM, 363 PSI. 13,743.0 13,734.0 4/7/2025 10:00 4/7/2025 11:00 1.00 COMPZN, RPCOMP PUTB P RIH identify PSI spike @ 13736', cont in PSI holding @ 13737' taking weight @ 13741'. 13,734.0 13,741.0 4/7/2025 11:00 4/7/2025 12:15 1.25 COMPZN, RPCOMP HOSO P L/D Joint # 436, 435 & 434. M/U space out pups 4.23', 6.18'. 9.19'. M/U hanger & landing joint. 13,741.0 13,710.0 4/7/2025 12:15 4/7/2025 22:15 10.00 COMPZN, RPCOMP OTHR P Terminate heater cables through hanger. Sting Thermo Coupling cables through hanger. Pump 2% 776 CI seawater. hanger fittings not able to slip over cable 13,710.0 13,710.0 4/7/2025 22:15 4/8/2025 00:00 1.75 COMPZN, RPCOMP WAIT P Send fittings to Baker for modification 13,710.0 13,710.0 4/8/2025 00:00 4/8/2025 06:00 6.00 COMPZN, RPCOMP WAIT P Send fittings to Baker for modification 13,710.0 13,710.0 4/8/2025 06:00 4/8/2025 08:00 2.00 COMPZN, RPCOMP OTHR P Make up and test heater connection at tubing hanger, PT 5000 psi 13,710.0 13,710.0 4/8/2025 08:00 4/8/2025 10:00 2.00 COMPZN, RPCOMP THGR P Finalize all terminations in hanger for heater and thermocouplers 13,710.0 13,710.0 4/8/2025 10:00 4/8/2025 11:30 1.50 COMPZN, RPCOMP THGR P Land hanger RILDS, pressure up tubing 500 psi bleed pressure, pressure up IA 961 psi hold 30 min pressure holding solid, confirm seals in PBR 13,710.0 13,735.0 4/8/2025 11:30 4/8/2025 13:00 1.50 COMPZN, RPCOMP SLKL P Rig up HES slick line 13,735.0 13,735.0 4/8/2025 13:00 4/8/2025 14:30 1.50 COMPZN, RPCOMP SLKL P RIH w/ slick line and ball and rod 13,735.0 13,735.0 4/8/2025 14:30 4/8/2025 15:30 1.00 COMPZN, RPCOMP SLKL P POOH w/ slick line lay on side of floor 13,735.0 13,735.0 4/8/2025 15:30 4/8/2025 18:30 3.00 COMPZN, RPCOMP PRTS P RU testing equipment for TxIA, purge air from lines. PT Tubing to 3000 psi for 30 -min. Pass. Bleed Tbg to 1500 psi. PT IA to 2500 psi for 30-min. Dump Tubing pressure to shear SOV. Pump 2 bpm / 326 psi through sheared SOV to confirm flow path. RD and release Slickline. 13,735.0 13,735.0 4/8/2025 18:30 4/8/2025 18:45 0.25 COMPZN, RPCOMP RURD P RD pressure testing equipment. L/D landing joint. Clean and clear rig floor. 13,735.0 0.0 4/8/2025 18:45 4/8/2025 19:15 0.50 COMPZN, WHDBOP MPSP P Set BPV. 0.0 0.0 4/8/2025 19:15 4/8/2025 19:30 0.25 COMPZN, WHDBOP PRTS P PT BPV to 1,000 psi from below. 0.0 0.0 Rig: NORDIC 3 RIG RELEASE DATE 4/9/2025 Page 5/5 2L-304 Report Printed: 4/29/2025 Operations Summary (with Timelog Depths) Job: RECOMPLETION Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 4/8/2025 19:30 4/9/2025 00:00 4.50 COMPZN, WHDBOP NUND P Drain Stack. ND BOP. Pull therm lines (x2) down from rig floor. Spool up into approx. 3' diameter bundles and store to prevent wire damage. Install tree test dart. PU tree adapter spool. Feed thermo lines through spool. 0.0 0.0 4/9/2025 00:00 4/9/2025 08:30 8.50 COMPZN, WHDBOP NUND P Continue to feed thermo lines through adapter spool. NU tubing head adapter. Verify electrical continuity. Attempt to PT hanger void to 5,000 psi. Tighten up heat trace penetrator to stop leak. Re- test. Penetrator thread still leaking. Remove penetrator fitting and found galled/damaged port thread in adapter spool (see pictures). Remove penetrator fittings. ND adapter spool. Chase port threads and clean up with tap. NU adapter spool and re-install penetrator fittings. Re-test hanger void to 5,000 psi. Confirm electrical connections are still good. NU new tree. 0.0 0.0 4/9/2025 08:30 4/9/2025 10:00 1.50 COMPZN, WHDBOP RURD P RU LRS to Tree in cellar. PT tree to 5,000 psi. Pull test dart and BPV. 0.0 0.0 4/9/2025 10:00 4/9/2025 11:00 1.00 DEMOB, MOVE FRZP P Freeze protect well with 89 bbls LEPD freeze protect // Pump 2 bpm @ 506 psi // Final circulating pressure 550 psi 0.0 0.0 4/9/2025 11:00 4/9/2025 12:00 1.00 DEMOB, MOVE RURD P Let well U-tube RD misc equipment Rig Released 12:00 from 2L-304 0.0 0.0 Rig: NORDIC 3 RIG RELEASE DATE 4/9/2025 Last Tag Annotation Depth (ftKB) Wellbore End Date Last Mod By Last Tag:14,042.0 2L-304 1/20/2025 fergusp Last Rev Reason Annotation Wellbore End Date Last Mod By Rev Reason: Post Rig Work 2L-304 4/16/2025 raineg Notes: General & Safety Annotation End Date Last Mod By NOTE: Salamander heat trace on outside of tubing 4/12/2025 spilch NOTE: 2025 RWO seals are only 4-5' into PBR. Avoid MITTs against plugs below PBR. 4/12/2025 spilch Casing Strings Csg Des OD (in) ID (in) Top (ftKB) Set Depth (ftKB) Set Depth (TVD) (ftKB) Wt/Len (lb/ft) Grade Top Thread CONDUCTOR 16 15.06 28.0 108.0 108.0 62.50 H-40 SURFACE 10 3/4 9.95 28.9 4,297.0 2,399.0 45.50 L-80 BTC-Mod INTERMEDIATE 7 5/8 6.87 26.1 14,330.5 5,681.1 29.70 L-80 BTCM Tubing Strings: "String Max Nominal OD" is the OD of the LONGEST segment in string Top (ftKB) 0.0 Set Depth … 13,736.4 String Max No… 3 1/2 Set Depth … 5,336.4 Tubing Description Tubing – Completion Upper Wt (lb/ft) 9.30 Grade L80 Top Connection EUE ID (in) 2.99 Completion Details: excludes tubing, pup, space out, thread, RKB... Top (ftKB) Top (TVD) (ftKB) Top Incl (°) Item Des OD Nominal (in)Com Make Model Nominal ID (in) 26.3 26.3 0.00 Hanger 10.844 FMC Gen 5 Tubing Hanger (3 1/2" EUE Top x Btm, Type "H" BPV) FMC Gen 4 2.952 13,641.3 5,285.8 58.76 Mandrel – GAS LIFT 5.890 3-1/2" x 1-1/2" MMG, GLM SLB MMG 2.920 13,701.9 5,317.7 57.61 Nipple - X 4.506 2.813" X-Nipple HAL X 2.813 13,723.1 5,329.2 57.18 Locator 4.490 Baker Locator 2.990 13,723.9 5,329.6 57.17 Seal Assembly 3.980 Baker 80-40 seal assembly (8.5' from fully located) 2.990 Top (ftKB) 13,732.4 Set Depth … 13,800.0 String Max No… 3 1/2 Set Depth … 5,371.4 Tubing Description Tubing – Completion Lower Wt (lb/ft) 9.30 Grade L-80 Top Connection EUE 8RD ID (in) 2.99 Completion Details: excludes tubing, pup, space out, thread, RKB... Top (ftKB) Top (TVD) (ftKB) Top Incl (°) Item Des OD Nominal (in)Com Make Model Nominal ID (in) 13,732.4 5,334.3 57.00 PBR 5.000 BAKER PBR 80-40 3.000 13,746.7 5,342.0 56.82 PACKER 6.670 BAKER FHL PACKER 2.920 13,791.1 5,366.5 56.40 NIPPLE 4.520 CAMCO 'D' NIPPLE 2.750 13,799.6 5,371.2 56.37 WLEG 4.530 CAMCO WIRELINE ENTRY GUIDE 2.990 Other In Hole (Wireline retrievable plugs, valves, pumps, fish, etc.) Top (ftKB) Top (TVD) (ftKB)Top Incl (°)Des Com Make Model SN Run Date ID (in) 13,781.0 5,360.9 56.47 CATCHER Set catcher sub on plug (2.73" x 10') 1/21/2025 0.000 13,791.0 5,366.4 56.40 TUBING PLUG Set 2.75" CA-2 Plug 1/21/2025 0.000 Mandrel Inserts : excludes pulled inserts Top (ftKB) Top (TVD) (ftKB) Top Incl (°) St ati on No /S Serv Valve Type Latch Type OD (in) TRO Run (psi) Run Date Com Make Model Port Size (in) 13,641.3 5,285.8 58.76 1 GAS LIFT OV RKP 1 1/2 0.0 4/13/2025 SLB MMG 0.250 Perforations & Slots Top (ftKB) Btm (ftKB) Top (TVD) (ftKB) Btm (TVD) (ftKB) Linked Zone Date Shot Dens (shots/ft)Type Com 14,000.0 14,020.0 5,483.3 5,494.8 5/23/2010 6.0 IPERF 2.5" Prospector gun, 60 degree phase Stimulation Intervals Top (ftKB) Btm (ftKB) Inter val Num ber Type Subtype Start Date Proppant Designed (lb) Proppant Total (lb) Vol Clean Total (bbl) Vol Slurry Total (bbl) 14,000.0 14,020.0 1 FRAC 5/24/2010 0.0 0.00 0.00 HORIZONTAL, 2L-304, 4/29/2025 2:19:06 PM Vertical schematic (actual) INTERMEDIATE; 26.1-14,330.5 IPERF; 14,000.0-14,020.0 FRAC; 14,000.0 TUBING PLUG; 13,791.0 CATCHER; 13,781.0 PACKER; 13,746.7 Nipple - X; 13,701.9 Mandrel – GAS LIFT; 13,641.3 SURFACE; 28.9-4,297.0 CONDUCTOR; 28.0-108.0 Hanger; 26.3 KUP PROD KB-Grd (ft) 33.58 RR Date 4/21/2010 Other Elev… 2L-304 ... TD Act Btm (ftKB) 14,340.0 Well Attributes Field Name TARN PARTICIPATING AREA Wellbore API/UWI 501032061300 Wellbore Status PROD Max Angle & MD Incl (°) 77.81 MD (ftKB) 4,850.26 WELLNAME WELLBORE2L-304 Annotation Last WO: End Date 4/9/2025 H2S (ppm) 25 Date 12/6/2016 Comment ORIGINATED TRANSMITTAL DATE: 2/19/2025 ALASKA E-LINE SERVICES TRANSMITTAL #: 5286 42260 Kenai Spur Hwy PO BOX 1481 - Kenai, Alaska 99611 FIELD Kuparuk PH: (907) 283-7374 FAX: (907) 283-7378 DELIVERABLE DESCRIPTION TICKET # WELL # API # LOG DESCRIPTION DATE OF LOG 5286 2L-304 50103206130000 Tubing Cut Record 8-Feb-2025 RECIPIENTS Conoco DIGITAL FILES PRINTS CD'S 1 FTP Transfer 0 0 USPS Attn: NSK-69 Richard.E.Elgarico@conocophillips.com 700 G Street Anchorage, AK 99503 Received By: Received By: Signature Signature AOGCC DIGITAL FILES PRINTS CD'S 1 ShareFile 0 0 USPS Attn: Natural Resources Technician II abby.bell@alaska.gov Alaska Oil & Gas Conservation Commision aogcc.data@alaska.gov 333 W. 7th Ave, Suite 100 - Anchorage, AK 99501 Received By: Received By: Signature Signature 210-011 T40105 Gavin Gluyas Digitally signed by Gavin Gluyas Date: 2025.02.19 15:24:54 -09'00' DNR DIGITAL FILES PRINTS CD'S 1 SharePoint Link 0 0 USPS Attn: Natural Resource Tech II DOG.Redata@alaska.gov 550 West 7th Ave, Suite #802 - Anchorage, AK 99501 Delivery Method: USPS Received By: Received By: Signature Signature Please return via e-mail a copy to both: AR@ake- line.com AKGGREDTSupport@ConocoPhillips.onmicrosoft.com 1. Type of Request:Abandon Plug Perforations Fracture Stimulate Repair Well Operations shutdown Suspend Perforate Other Stimulate Pull Tubing Change Approved Program Plug for Redrill Perforate New Pool Re-enter Susp Well Alter Casing Other: Replace Tubing 2.Operator Name:4. Current Well Class: 5. Permit to Drill Number: Exploratory Development 3. Address:Stratigraphic Service 6.API Number: 7. If perforating:8. Well Name and Number: What Regulation or Conservation Order governs well spacing in this pool?N/A Yes No 9. Property Designation (Lease Number):10. Field: Tarn Oil Pool Tarn Oil Pool 11. Total Depth MD (ft):Total Depth TVD (ft): Effective Depth MD: Effective Depth TVD: Junk (MD): 14340'5687' 5508'1766 13791'13528' Casing Collapse Conductor Surface Production Packers and SSSV Type:Packers and SSSV MD (ft) and TVD (ft): 12. Attachments:Proposal Summary Wellbore schematic 13. Well Class after proposed work: Detailed Operations Program BOP Sketch Exploratory Stratigraphic Development Service 14. Estimated Date for 15. Well Status after proposed work: Commencing Operations:OIL WINJ WDSPL Suspended 16. Verbal Approval:Date: GAS WAG GSTOR SPLUG AOGCC Representative: GINJ Op Shutdown Abandoned Contact Name: Contact Email: Contact Phone: 907-263-4742 Authorized Title: Conditions of approval: Notify AOGCC so that a representative may witness Sundry Number: Plug Integrity BOP Test Mechanical Integrity Test Location Clearance Other Conditions of Approval: Post Initial Injection MIT Req'd? Yes No APPROVED BY Approved by: COMMISSIONER THE AOGCC Date: Comm. Comm. Sr Pet Eng Sr Pet Geo Sr Res Eng 14331' Baker FHL SSSV: None Perforation Depth MD (ft): 14042' KRU 2L-304 14000'MD/14020'TVD 14305' 5483'MD/5495'TVD 108' 4297' 5681'7-5/8" 3/1/2025 3-1/2" 16" 10-3/4" 80' Burst 4268' 13800'MD MD 108' 2399' STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS 20 AAC 25.280 ADL0025603, ADL00380051, ADL0380052 210-011 P.O. Box 100360, Anchorage, AK 99510 ConocoPhillips Alaska, Inc Proposed Pools: AOGCC USE ONLY Tubing Grade:Tubing MD (ft): 13747'MD/5342'TVD Perforation Depth TVD (ft): Will perfs require a spacing exception due to property boundaries? Current Pools: MPSP (psi):Plugs (MD): 17. I hereby certify that the foregoing is true and the procedure approved herein will not be deviated from without prior written approval. Authorized Name and Digital Signature with Date: Tubing Size: PRESENT WELL CONDITION SUMMARY Length Size Kuparuk River Field Elliott Tuttle elliott.tuttle@conocophillips.com RWO Engineer Subsequent Form Required: Suspension Expiration Date: L-80 TVD m n P 2 66 t g N Form 10-403 Revised 06/2023 Approved application valid for 12 months from date of approval.Submit PDF to aogcc.permitting@alaska.gov 50-103-20613-00-00 By Grace Christianson at 1:48 pm, Jan 30, 2025 325-046 Digitally signed by Elliott Tuttle Reason: I am the author of this document Location: Anchorage Tower, CoP Date: 2025.01.30 12:55:20-09'00' Elliott Tuttle X DSR-1/31/25A.Dewhurst 20FEB25 10-404 AOGCC Witnessed BOP and Annular Test to 2500 psi. JJL 2/5/25 *&: 2/25/2025 Jessie L. Chmielowski Digitally signed by Jessie L. Chmielowski Date: 2025.02.25 13:54:27 -09'00' RBDMS JSB 022625 P.O. BOX 100360 ANCHORAGE, ALASKA 99510-0360 January 29, 2025 Commissioner State of Alaska Alaska Oil & Gas Conservation Commission 333 West 7th Avenue Suite 100 Anchorage, Alaska 99501 Dear Commissioner: Elliott Tuttle Senior Wells Engineer CPAI Drilling and Wells ConocoPhillips Alaska, Inc. hereby submits an Application for Sundry Approval to work over KUP Producer 2L-304 (PTD# 210-011). Well 2L-304 was drilled and completed in April of 2010 by Doyon 16 as a Tarn gas lifted producer. Due to parrafin and ice blockage issues the well has minimal to no uptime. This well has been selected as a heat trace candidate in support of future Willow field development and the intent is to install the heat trace down the outside of the tubing to 6500' RKB during this RWO. If you have any questions or require any further information, please contact me at +1-907-252-3347. The tubing will be pulled from a pre-rig cut. The new completion would be a stack packer and new 3 1/2" tubing with the heat trace down to 6500' RKB. Digitally signed by Elliott Tuttle Reason: I am the author of this document Location: Anchorage Tower, CoP Date: 2025.01.30 12:54:58-09'00' Elliott Tuttle Ϯ>ͲϯϬϰZtKWƌŽĐĞĚƵƌĞ dĂƌŶWƌŽĚƵĐĞƌ WΘZdƵďŝŶŐǁͬ,ĞĂƚdƌĂĐĞ WdηϮϭϬͲϬϭϭ WĂŐĞϭŽĨϮ  ŽŵƉůĞƚĞĚWƌĞͲZŝŐtŽƌŬ ϭ͘ dͲWWWKdĂŶĚdͲWKdƚĞƐƚƐ;ƉĂƐƐĞĚͿ/ͲWKdĂŶĚ/ͲWWWKd;ƉĂƐƐĞĚͿ&d>͛Ɛ;ŽŵƉůĞƚĞͿʹϭͬϭϯͬϮϬϮϱ Ϯ͘ DĞĂƐƵƌĞ^,W͕ϮϰϭϯƉƐŝΛϱϰϴϵ͛dsʹϭͬϮϬͬϮϱ ϯ͘ ^ĞƚƉůƵŐΛϭϯϳϵϭ͛Z<͕^Ğƚ:ƵŶŬĐĂƚĐŚĞƌĂďŽǀĞʹϭͬϮϭͬϮϱ ϰ͘ KƉĞŶůŽǁĞƐƚ'>DŝŶƵƉƉĞƌĐŽŵƉůĞƚŝŽŶʹϭͬϮϭͬϮϱ ϱ͘ D/dddž/ƚŽϯϱϬϬƉƐŝ;ƉĂƐƐĞĚͿʹϭͬϮϲͬϮϱ ZĞŵĂŝŶŝŶŐWƌĞͲZŝŐtŽƌŬ ϲ͘ ƵƚƚƵďŝŶŐĂƚϭϯϳϭϬ͛Z<ŽƌŵŝĚĚůĞŽĨĨŝƌƐƚĨƵůůũŶƚĂďŽǀĞWZͬ^ĞĂůƐƐĞŵďůLJ ϳ͘ ZĞĂĚLJǁĞůůϰϴŚƌƐƉƌŝŽƌƚŽƌŝŐĂƌƌŝǀĂů ZŝŐtŽƌŬ D/Zh ϭ͘ D/ZhEĂďŽƌƐEŽƌĚŝĐϯŽŶϮ>ͲϯϬϰ͘;EŽWsƐĞƚĨŽƌD/ZhĚƵĞƚŽŝŶƚĞƌŶĂůƌŝƐŬĂƐƐĞƐƐŵĞŶƚĨŽƌEŽƌĚŝĐϯͿ Ϯ͘ ZĞĐŽƌĚƐŚƵƚͲŝŶƉƌĞƐƐƵƌĞƐŽŶƚŚĞdΘ/͘/ĨƚŚĞƌĞŝƐƉƌĞƐƐƵƌĞ͕ďůĞĞĚŽĨĨ/ĂŶĚͬŽƌƚƵďŝŶŐƉƌĞƐƐƵƌĞĂŶĚĐŽŵƉůĞƚĞ ϯϬͲŵŝŶƵƚĞE&d͘sĞƌŝĨLJǁĞůůŝƐĚĞĂĚ͘ŝƌĐƵůĂƚĞ<t&ĂƐŶĞĞĚĞĚ͘ Ă͘ WůĂŶŶĞĚĨůƵŝĚŝƐƐĞĂǁĂƚĞƌĂƐǁĞǁŝůůďĞŝƐŽůĂƚĞĚĨƌŽŵƌĞƐĞƌǀŽŝƌƚŚƌŽƵŐŚŽƵƚZtK͘ ϯ͘ ^ĞƚWsĂŶĚĐŽŶĨŝƌŵĂƐďĂƌƌŝĞƌŝĨŶĞĞĚĞĚ͕EdƌĞĞ͕EhKWĂŶĚƚĞƐƚƚŽϮϱϬͬϮ͕ϱϬϬƉƐŝ͘dĞƐƚĂŶŶƵůĂƌϮϱϬͬϮ͕ϱϬϬ ƉƐŝ͘ ZĞƚƌŝĞǀĞdƵďŝŶŐĨƌŽŵWƌĞͲZŝŐƵƚΛϭϯ͕ϳϭϬ͛Z< ϰ͘ WƵůůWs͕DhůĂŶĚŝŶŐũŽŝŶƚĂŶĚK>^͘ ϱ͘ WƵůůϯͲϭͬϮ͟ƚƵďŝŶŐĚŽǁŶƚŽϭϯ͕ϳϭϬ͛Z< ůĞĂŶŽƵƚZƵŶ ϲ͘ WĞƌĨŽƌŵĂůĞĂŶŽƵƚƌƵŶŝĨŶĞĐĞƐƐĂƌLJďĂƐĞĚŽŶƚƵďŝŶŐĐŽŶĚŝƚŝŽŶĂŶĚĚƌĞƐƐŽĨĨϯ͘ϱ͟ƚƵďŝŶŐƐƚƵďŝĨŶĞĐĞƐƐĂƌLJ͘ /ŶƐƚĂůůŝŶϯͲЪ͟dƵďŝŶŐǁŝƚŚ,ĞĂƚdƌĂĐĞ ϳ͘ DhϯЪ͟ĐŽŵƉůĞƚŝŽŶǁŝƚŚŽǀĞƌƐŚŽƚ͕ƉĂĐŬĞƌ͕'>DƐ͕ĂŶĚŚĞĂƚƚƌĂĐĞ͘Z/, ϴ͘ KŶĐĞŽŶĚĞƉƚŚ͕ƐĞƚƉĂĐŬĞƌĂŶĚƐƉĂĐĞŽƵƚĂƐŶĞĞĚĞĚ͘ ϵ͘ WƌĞƐƐƵƌĞƚĞƐƚƚƵďŝŶŐƚŽϯϬϬϬƉƐŝĨŽƌϱŵŝŶƵƚĞƐ͘ ϭϬ͘ WƌĞƐƐƵƌĞƚĞƐƚŝŶŶĞƌĂŶŶƵůƵƐƚŽϮϱϬϬƉƐŝĨŽƌϯϬŵŝŶƵƚĞƐŽŶĐŚĂƌƚ͘ EKW͕EhdƌĞĞ ϭϭ͘ ŽŶĨŝƌŵƉƌĞƐƐƵƌĞƚĞƐƚƐ͕ƚŚĞŶƐŚĞĂƌŽƵƚ^KsǁŝƚŚƉƌĞƐƐƵƌĞĚŝĨĨĞƌĞŶƚŝĂů͘ ϭϮ͘ /ŶƐƚĂůůWs͘ ϭϯ͘ EKW͘EhƚƌĞĞ͘ ϭϰ͘ WƵůůWs͕ĨƌĞĞnjĞƉƌŽƚĞĐƚǁĞůů͕ĂŶĚƐĞƚWsŝĨŶĞĐĞƐƐĂƌLJ͘ ϭϱ͘ ZDK͘ WŽƐƚͲZŝŐtŽƌŬ ϭϲ͘ WƵůůWs͕ŝĨŶĞĐĞƐƐĂƌLJ ϭϳ͘ WƵůů^Ks͕s͛Ɛ͕ĂŶĚ/ŶƐƚĂůů'> ϭϴ͘ WƵůůZ,ĂŶĚĂůůĂŶĚZŽĚ ϭϵ͘ ZĞƚƵƌŶƚŽŽƉĞƌĂƚŝŽŶƐĂŶĚWKW    Ϯ>ͲϯϬϰZtKWƌŽĐĞĚƵƌĞ dĂƌŶWƌŽĚƵĐĞƌ WΘZdƵďŝŶŐǁͬ,ĞĂƚdƌĂĐĞ WdηϮϭϬͲϬϭϭ WĂŐĞϮŽĨϮ  'ĞŶĞƌĂůtĞůůŝŶĨŽ͗ Wellhead type/pressure rating: FMC 10 ¾ x 7 5/8 x 3 1/2, 5M x 11” psi top flange Production Engineer: Will Parker Reservoir Development Engineer: Mandy Pogany Estimated Start Date: 3/1/25 Workover Engineer: Elliott Tuttle (907-252-3347/ Elliott.tuttle@conocophillips.com) Current Operations: This well is currently shut in. Well Type: Producer Scope of Work: Pull the existing 3-1/2” completion down to the pre-rig cut at 13710’ RKB, install a new 3-1/2” completion with stacked packer and heat trace down to 6500’ RKB. BOP configuration: Annular / Pipe Rams / Blind Rams / Pipe Ram Following subject to change/be updated with pre-rig work: MIT results: MIT-T N/A CMIT-TxIA Passed 1/26/25 MIT-OA N/A open shoe (SCLD passed, 1/13/25) IC POT &PPPOT PASSED – 1/13/25 TBG POT &PPPOT PASSED – 1/13/25 MPSP: 1766 psi using 0.1 psi/ft gradient Static BHP: 2413 psi / 5,489’ TVD measured on 1/20/25  2L-304 Proposed RWO Completion COMPLETION INFO MD (ft RKB) TVD (ft RKB) OD (in) Nom. ID (in) Weight (lb/ft)Grade Thread (top) Thread (btm) Conductor 108 108 16 15.06 62.5 H-40 Welded Welded Surface 4297 2399 10 3/4 9.95 45.5 L-80 BTC-Mod BTC-Mod Production 14330.5 5681.1 7 5/8 6.875 29.7 L-80 BTCM BTCM Tubing 13800 5371.4 3 1/2 2.992 9.3 L-80 EUE-M EUE-M New Tubing 13710 5322 3 1/2 2.992 9.3 L-80 EUE-M EUE-M 2 ea. 5/8" Salamander Heater Cables, spliced together @ btm ~6500' RKB 1 ea. 1/4" Tec w/ Thermocouples PROPOSED COMPLETION 3-1/2" 9.3# L-80 EUE 8rd Tubing to surface 3-1/2" Camco MMG gas lift mandrels @ TBD 3 1/2" x 7 5/8" Baker Premier Packer (Cut to Release) 3-½" XN landing nipple at xxxx' RKB (2.75" min ID) 3-1/2" Non-sealing Overshot REMAINING COMPLETION LEFT IN HOLE Tubing cut @ ~13,710' RKB Baker PBR (80-40) @ 13,732.4' RKB Baker FHL Packer @ 13,746.7' RKB Camco D Nipple (2.75" ID) @ 13,791' RKB Camco WLEG @ 13799.6' RKB Surface Casing Production/Intermediate Casing Conductor Tarn perfs 14,000' - 14,030' RKB 5,483' - 5,495' TVD Surface Casing Cement: 573.6Bbls Lead 10.7ppg , 119.4Bbls 12ppg Production Casing Cement: 109.6 Bbls 15.8ppg BCalculated TOC: 11,565' RK Assuming Gauge Hole & Accounting for Shoe Track Vol Packer Top @ ~13863' RKB 14,020' MD Last Tag Annotation Depth (ftKB) Wellbore End Date Last Mod By Last Tag:14,042.0 2L-304 1/20/2025 fergusp Last Rev Reason Annotation Wellbore End Date Last Mod By Rev Reason: Tag, set plug, catcher, pulled OV. Noted fish 2L-304 1/21/2025 fergusp Casing Strings Csg Des OD (in) ID (in) Top (ftKB) Set Depth (ftKB) Set Depth (TVD) (ftKB) Wt/Len (lb/ft) Grade Top Thread CONDUCTOR 16 15.06 28.0 108.0 108.0 62.50 H-40 SURFACE 10 3/4 9.95 28.9 4,297.0 2,399.0 45.50 L-80 BTC-Mod INTERMEDIATE 7 5/8 6.87 26.1 14,330.5 5,681.1 29.70 L-80 BTCM Tubing Strings: "String Max Nominal OD" is the OD of the LONGEST segment in string Top (ftKB) 25.9 Set Depth … 13,800.0 Set Depth … 5,371.4 String Max No… 3 1/2 Tubing Description TUBING Wt (lb/ft) 9.30 Grade L-80 Top Connection EUE 8RD ID (in) 2.99 Completion Details: excludes tubing, pup, space out, thread, RKB... Top (ftKB) Top (TVD) (ftKB) Top Incl (°) Item Des OD Nominal (in)Com Make Model Nominal ID (in) 25.9 25.9 0.00 HANGER 8.000 FMC TUBING HANGER 2.992 479.7 478.9 6.17 NIPPLE 4.520 Camco DS 2.875" Profile nipple 2.875 4,301.0 2,400.2 72.83 GAS LIFT 5.390 CAMCO KBMG 2.920 8,309.2 3,590.9 72.75 GAS LIFT 5.390 CAMCO KBMG 2.920 12,139.3 4,730.3 72.32 GAS LIFT 5.390 CAMCO KBMG 2.920 13,528.2 5,228.2 59.89 GAS LIFT 5.390 CAMCO KBMG 2.920 13,680.6 5,306.4 58.03 SLEEVE-C 4.500 BAKER CMU SLIDING SLEEVE (CLOSED 5/23/2010) 2.812 13,732.4 5,334.3 57.00 PBR 5.000 BAKER PBR 80-40 3.000 13,746.7 5,342.0 56.82 PACKER 6.670 BAKER FHL PACKER 2.920 13,791.1 5,366.5 56.40 NIPPLE 4.520 CAMCO 'D' NIPPLE 2.750 13,799.6 5,371.2 56.37 WLEG 4.530 CAMCO WIRELINE ENTRY GUIDE 2.990 Other In Hole (Wireline retrievable plugs, valves, pumps, fish, etc.) Top (ftKB) Top (TVD) (ftKB)Top Incl (°)Des Com Make Model SN Run Date ID (in) 13,528.0 5,228.1 59.89 FISH 1" x 9" long bottom half of OV. (suspected to be in pocket of station # 5 @ 13,528' RKB 1/21/2025 0.000 13,781.0 5,360.9 56.47 CATCHER Set catcher sub on plug (2.73" x 10') 1/21/2025 0.000 13,791.0 5,366.4 56.40 TUBING PLUG Set 2.75" CA-2 Plug 1/21/2025 0.000 Mandrel Inserts : excludes pulled inserts Top (ftKB) Top (TVD) (ftKB) Top Incl (°) St ati on No /S Serv Valve Type Latch Type OD (in) TRO Run (psi) Run Date Com Make Model Port Size (in) 4,301.0 2,400.2 72.83 1 GAS LIFT DMY BK-5 1 0.0 4/20/2010 0.000 7,180.9 3,248.6 71.65 2 CHEM DMY BK-5 1 0.0 4/20/2010 0.000 8,309.2 3,590.9 72.75 3 GAS LIFT DMY BK-5 1 0.0 4/20/2010 0.000 12,139.3 4,730.3 72.32 4 GAS LIFT DMY BK-5 1 0.0 4/20/2010 0.000 13,528.2 5,228.2 59.89 5 GAS LIFT OV BK 1 0.0 4/20/2018 0.313 Perforations & Slots Top (ftKB) Btm (ftKB) Top (TVD) (ftKB) Btm (TVD) (ftKB) Linked Zone Date Shot Dens (shots/ft)Type Com 14,000.0 14,020.0 5,483.3 5,494.8 5/23/2010 6.0 IPERF 2.5" Prospector gun, 60 degree phase Stimulation Intervals Top (ftKB) Btm (ftKB) Inter val Num ber Type Subtype Start Date Proppant Designed (lb) Proppant Total (lb) Vol Clean Total (bbl) Vol Slurry Total (bbl) 14,000.0 14,020.0 1 FRAC 5/24/2010 0.0 0.00 0.00 HORIZONTAL, 2L-304, 1/22/2025 8:19:09 AM Vertical schematic (actual) INTERMEDIATE; 26.1-14,330.5 Float Shoe; 14,329.0-14,330.5 Float Collar; 14,252.4-14,253.7 FRAC; 14,000.0 IPERF; 14,000.0-14,020.0 WLEG; 13,799.6 TUBING PLUG; 13,791.0 NIPPLE; 13,791.1 CATCHER; 13,781.0 PACKER; 13,746.7 PBR; 13,732.4 SLEEVE-C; 13,680.6 GAS LIFT; 13,528.2 FISH; 13,528.0 GAS LIFT; 12,139.3 GAS LIFT; 8,309.2 CHEMICAL; 7,180.9 GAS LIFT; 4,301.0 SURFACE; 28.9-4,297.0 Silver Bullet Float shoe; 4,294.7- 4,297.0 Float Collar; 4,216.1-4,217.6 NIPPLE; 479.7 CONDUCTOR; 28.0-108.0 CONDUCTOR; 28.0-108.0 HANGER; 28.9-29.1 HANGER; 25.9 KUP PROD KB-Grd (ft) 33.58 RR Date 4/21/2010 Other Elev… 2L-304 ... TD Act Btm (ftKB) 14,340.0 Well Attributes Field Name TARN PARTICIPATING AREA Wellbore API/UWI 501032061300 Wellbore Status PROD Max Angle & MD Incl (°) 77.81 MD (ftKB) 4,850.26 WELLNAME WELLBORE2L-304 Annotation Last WO: End DateH2S (ppm) 25 Date 12/6/2016 Comment Image Project Well History File Cover Page XHVZE This page identifies those items that were not scanned during the initial production scanning phase. They are available in the original file, may be scanned during a special rescan activity or are viewable by direct inspection of the file. cQ LQ - 0 4 L Well History File Identifier Organizing (done) Two-sided II II'll)ll III ll III ❑ Rescan Needed 11111111 INN RES AN DIGITAL DATA OVERSIZED (Scannable) Color Items: ❑ Diskettes, No. ❑ M ps: oeGleyscale Items: they, No/Type: c 7 oo. 1. Other Items Scannable by l a Large Scanner ("PAM ft l b ❑ Poor Quality Originals: LQ G-S OVERSIZED (Non-Scannable) ❑ Other: ❑ Logs of various kinds: NOTES: ❑ Other:: BY: Maria Date: /s/ c Project Proofing I hlihi BY: Maria Date: J g//1t /s/ Scanning Preparation 4. x 30 = / 0 + Z. = TOTAL PAGES 1 �' Count does not include cover sheet) BY: 1 Maria Date: q/i Li /s/ Production Scanning II I Stage 1 Page Count from Scanned File: /6-'0 (Count does include cover sheet) Page Count Matches Number in Scanning Preparation: �ES NO BY: Date: '/a ' /s/ Stage 1 If NO in stage 1, page(s) discrepancies ``were found: YES NO BY: Maria Date: /s/ Scanning is complete at this point unless rescanning is required. I IIIII ReScanned 1111111111M 11111 BY: Maria Date: /s/ Comments about this file: Quality Checked 1111111111 11111 12/22/2011 Well History File Cover Paae.doc V Mo I m m U Z 2 p O , \ I (a IYamo° Z -Z op E op E o_ CO c f6 w � E U , o N a)�a, m o o E CV N Z , p w 6 p p J f o a al- c a E c aO a a a o c a0~ � W W daH p Fo ��ap o U m m m o EI 0 ° p c p� v 'f `Ix ir) I p p p L tL U D co E C I U n E v 'o- E w LL 0 0 2 00 -W m a) 0-a m 0 p p p p p p Z = - 2aar2 0 � j c C p p OwzOW 2 a itw0cnQ iiu.10(7)cc 2 2 2 2 v, a ' 1° ° d p I E > O o O O O O o co O O O O O O tl •d 0 0 0 0 0 0 0 0 0 0 J i y III N y j N_ N N N N N N N N N N N N N U O p M'C C C C N-- ,- NN-- Z In In (0 U) U) to ID U) (0 LO C) I E j c c C x x n a C C c a) a) a C a C C C C C C C C 000n n 0. 0. 0. o. n o.g to I a) U O 0 0 O O 0 0 0 0 0 0 0 0 0 0 N it .� Q a7 D (O 0. N O O CD M M N ID O M 0 M M M O N a. j O N v A O A co A co A co d I m _ _ ce W a0 c u) )n m 0 m 0 co m m co co (O N N 0 0 N N N N N N N N U (I), .- N N N N N N N N N N W z V UO O 'I, Z S r I C ° Q C N X Z J o' N 14 O d o I o 0 Ow o o o o o o o o N c Z ! 0 U U U U U U U U U U • G c H a) N , a) O N N a E 1) I a o a O v in v N N N N N N N N N N U U E J N 01 v cn i j J M Q N 1 z Q O I- 0 III I N . II • N I 03 re v <• a '' Q` a• o � I M d• U o c v) .- .- E 1 J I o tl) N N m To Z o 0 )o (x CD cC c c U —y Q) O O O W -E m 0) 0) 0) m 0) 0) 0) Iii E a) C J J J 0 0 0 0 J 0o to I> j = o D. p. v v v v v v v v Z N v v v a) a) > > > 7 7 = = H C C C ct M M M 2 2 2 22 2 2 ca o o z O y m d in -J y o V w co I I y 2 E° a) o) o z .c o 2 re o W0Z O Q- G R .+u. •�, O Z 1 2 7 C !T i N V ix Q M t O v C 0 • d 13 C m o , W u- a 2\\..) U \ " \ \ \ \ \x Z - y J 1 0) 0) 0) 0) 0) 0) 0) 0) a I a' I o I—' 3 JGI- ' W J J W J J J J J J J J 0 0 0 N � co _U C7 o I o c I in a> 1 I i~ c t Z is I E. _o I J p W Z .- o EI Q c c c E a) j ai < u) 0 0 O E , O Ce J V Q a��i o o J 0 a U Q ja Z Z CL. 71 ca z W "±"-. v) z � V N N C. W °z v I I U U J o ' W N o U Ct a Q CY Z H y o Oa = m C� c T E O O N N a E O) v J J 1 La N r Z a a o W N 2 V C p Y r V) a o U) C Q Y o I Q a ' C 11 1 CI d• U I 2 2 H I co co Er) c — Z — g C C I a) _� o 0 • ao ,ot a � o to CD a o oz , 04 I=Z >-yr m 3 j m p a.) a y z �. > I E E m • N U t6 ca• T J Q N Z Q c`"- I a) o �` Z P' C C y • °\U ti� o O Q rx .N a) I a) m E V p U a 1 E o a z °w ww c .¢ 0 <w ! 0 I 0 Conoco Phillips Alaska P.O.BOX 100360 ANCHORAGE,ALASKA 99510-0360 May 15,2012 Commissioner Dan Seamount Alaska Oil&Gas Commission 333 West 7th Avenue, Suite 100 ( o_ 0 t I Anchorage,AK 99501 3b1/' Commissioner Dan Seamount: Enclosed are the spreadsheets with a list of wells from the Alpine field(CRU),and the Kuparuk field(KRU). Each of these wells was found to have a void in the conductor. These voids were filled with cement and corrosion inhibitor, engineered to prevent water from entering the annular space. As per previous agreement with the AOGCC,this letter and spreadsheets serves as notification that the treatments took place and meets the requirements of form 10-404, Report of Sundry Operations. The cement was pumped in the spring of 2012. The corrosion inhibitor/sealant was pumped in the months of April and May 2012. The attached spreadsheet presents the well name,top of cement depth prior to filling, and volumes used on each conductor. Please call MJ Loveland or Martin Walters at 907-659-7043, if you have any questions. Sincerely, fi7c4á Martin Walters ConocoPhillips Well Integrity Projects Supervisor • ConocoPhillips Alaska Inc. . Surface Casing by Conductor Annulus Cement, Corrosion inhibitor,Sealant Top-off Report of Sundry Operations(10-404) Kuparuk Field Date 5/15/2012 1C,1D,1E,2L,3H PAD Corrosion _ Initial top of Vol.of cement Final top of Cement top off Corrosion inhibitor/ Well Name API# PTD# cement pumped cement date inhibitor sealant date ft bbls ft gal 1C-133 50029230130000 2010770 16" : 3.9 12" 5/8/2012 6.8 5/14/2012 1D-116 50029229150000 1981720 10" 1.2 10" 5/8/2012 4.3 5/15/2012 1E-123 50029232080000 2040740 5" n/a 18" n/a 5.1 4/9/2012 2L-304 50103206130000 2100110 31" 0.30 20" 3/30/2012 4.3 5/14/2012 2L-306 50103206300000 2101820 8" n/a 8" n/a 3.4 5/14/2012 2L-310 50103206160000 2100280 25" 0.25 12" 3/30/2012 2.6 5/14/2012 2L-312 50103206260000 2101640 13" n/a 13" n/a 2.5 5/14/2012 2L-319 50103205520000 2071120 112" 1.00 20" 3/30/2012 6 5/14/2012 2L-320 50103206270000 2101660 36' 1.00 50" 3/30/2012 3.4 5/14/2012 3H-17 50103200810000 1870990 19" n/a 19" n/a 3.4 4/9/2012 Page 1 of 1 Schwartz, Guy L (DOA) From: Greener, Mike R. [Mike.R.Greener @conocophillips.com] Sent: Tuesday, October 26, 2010 10:03 AM To: Schwartz, Guy L(DOA) Cc: Alvord, Chip; Chambers, Mark A Subject: RE: 2L-304 ( PTD 210-011) BOP test question Attachments: Greener Mike (Mike.R.Greener @conocophillips.com).vcf The 3-1/2" x 6" variables were the lower rams in the BOP stack. The rams that were changed out for the 7-5/8" casing run were the upper pipe rams and those were tested after being changed out. After the 7-5/8" casing run we broke the wellhead to set the casing slips and did not change out any rams which explains the shell test. The 3-1/2" x 6" variables were still in the stack for the tubing run. 3 PL.- /Cr 0.-711.4 Mike Greener y 16. — 7 " u re,.4,4- ,ea....� From: Schwartz, Guy L(DOA) [mailto:guy.schwartz @alaska.gov] Sent: Monday, October 25, 2010 4:45 PM To: Greener, Mike R. Subject: 2L-304 ( PTD 210-011) BOP test question Mike, In reviewing the 407 I saw that after the 7 5/8" casing was run and cemented there is no mention of changing out the 7 5/8" BOP rams back to VBR's to run the 3.5" production tubing. Is that what happened or did the crew just fail to put it in the daily log?? All that is mentioned is doing a body test. Regards Guy Schwartz Senior Petroleum Engineer AOGCC 793-1226 (office) 444-3433 (cell) 10/26/2010 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG la.Well Status: Oil 131 Gas ❑ SPLUG ❑ Plugged ❑ Abandoned ❑ Suspended ❑ lb.Well Class: 20AAC 25.105 20AAC 25.110 Development 0 . Exploratory ❑ GINJ ❑ WINJ ❑ WAG ❑ WDSPL ❑ Other ❑ No.of Completions: Service ❑ Stratigraphic Test❑ 2.Operator Name: 5.Date Comp.,Susp., 12.Permit to Drill Number: ConocoPhillips Alaska, Inc. orAband.: April 21,2010 . 210-011 / • 3.Address: 6.Date Spudded: 13.API Number: P.O. Box 100360,Anchorage,AK 99510-0360 March 22,2010 50-103-20613-00 • 4a.Location of Well(Governmental Section): 7.Date TD Reached: 14.Well Name and Number: • Surface: 147'FNL,559'FEL,Sec.22,T1ON, R7E, UM' April 16,2010 2L-304 • Top of Productive Horizon: 8. KB(ft above MSL): 115'RKB • 15.Field/Pool(s): 1409'FNL,759'FWL,Sec. 19,T1ON,R8E,UM GL(ft above MSL): 142'AMSL • Kuparuk River Field • Total Depth: 9.Plug Back Depth(MD+TVD): 1741'FNL,972'FWL,Sec. 19,T1ON,R8E, UM 14331'MD/5681'TVD Tarn Oil Pool - 4b.Location of Well(State Base Plane Coordinates,NAD 27): 10.Total Depth(MD+ND): 16.Property Designation: Surface: x-461093 ' y- 5927698 • Zone-4 • 14340'MD/5687'TVD • ADL 380052,380051,025603 TPI: x-472964 y- 5926384 Zone-4 11.SSSV Depth(MD+ND): 17.Land Use Permit: Total Depth: x-473175 y- 5926051 Zone-4 nipple @ 480'MD/479'ND 4600,4599,2677 18.Directional Survey: Yes El No❑ 19.Water Depth,if Offshore: 20.Thickness of Permafrost MD/TVD: (Submit electronic and printed information per 20 AAC 25.050) N/A (ft MSL) 1200'MD/1160'ND • 21.Logs Obtained(List all logs here and submit electronic and printed information per 20 AAC 25.071): 22.Re-drill/Lateral Top Window MD/TVD GR/Res not applicable 23. CASING,LINER AND CEMENTING RECORD SETTING DEPTH MD SETTING DEPTH ND HOLE AMOUNT CASING SIZE WT.PER FT. GRADE TOP BOTTOM TOP BOTTOM SIZE CEMENTING RECORD PULLED 16" 62.5# H-40 26' 108' 26' 108' 24" Driven 10.75" 45.5# L-80 29' 4297' 29' 2399' 13.5" 713 sx AS Lite,412 sx DeepCRETE 7.625" 29.7# L-80 26' 14331' 26' 5681' 9.875" 527 sx Class G 24.Open to producllion or injection? Yes Q No ❑ If Yes,list each 25. TUBING RECORD Interval open(MD+TVD of Top&Bottom;Perforation Size and Number): SIZE DEPTH SET(MD) PACKER SET(MD/ND) 3.5" 13800' 13747'MD/5342'ND 14000'-14020'MD 5483'-5495'ND 6 spf _ C.v :r'_r i idN r 26. ACID,FRACTURE,CEMENT SQUEEZE,ETC. is 1 • I DEPTH INTERVAL(MD) AMOUNT AND KIND OF MATERIAL USED f 14000'-14020'MD 167010#of 16/20 carbolite to l wrIname 27. PRODUCTION TEST Date First Production Method of Operation(Flowing,gas lift,etc.) June 2,2010 gas lift oil Date of Test Hours Tested Production for OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE GAS-OIL RATIO 6/7/2010 24 hours Test Period--> 1143 958 52 40% 839 Flow Tubing Casing Pressure Calculated OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-API(corr) Press. 424 psi 1264 24-Hour Rate-> 1143 958 52 not available 28. CORE DATA Conventional Core(s)Acquired? Yes ❑ No 0 Sidewall Cores Acquired? Yes ❑ No Q If Yes to either question,list formations and intervals cored(MD+TVD of top and bottom of each),and summarize lithology and presence of oil,gas or water (Submit separate sheets with this form,if needed).Submit detailed descriptions,core chips,photographs and laboratory analytical results per 20 AAC 25.071. RECEIVED NONE JUN 2 2 2010 Alaska Oil&Gas Cons.Commission RBDMS JUN 2.2 2010 Anchorage Form 10-407 Revised 7/2009 CONTINUED ON REVERSE Submit original only 74 !a• �o y>0-2 ; G 28. GEOLOGIC MARKERS(List all formations and markers encountered): 29. FORMATION TESTS NAME MD TVD Well tested? ❑ Yes 0 No If yes,list intervals and formations tested, Permafrost-Top ground surface ground surface briefly summarizing test results. Attach separate sheets to this form,if Permafrost-Bottom 1200' 1160' needed,and submit detailed test information per 20 AAC 25.071. C-50 9383' 3913' C-40 10706' 4306' T-7 12957' 4979' T-3 13760' 5349' Top of Formation 13854' 5401' T-2 14034' 5503' N/A Formation at total depth: Bermuda 30. LIST OF ATTACHMENTS Summary of Daily Operations,final directional survey,schematic 31. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact: Mike Gar @ 263-4820 Printed Nam .L.Alvord Title: Alaska Drilling Manager Signature d / Phone 265-6120 Date Vim. Z', Ze,10 ;43 4 V r r Sharon Allsup-Drake INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. Item 1a: Classification of Service wells: Gas injection,water injection,Water-Alternating-Gas Injection,Salt Water Disposal,Water Supply for Injection,Observation,or Other.Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. Item 4b: TPI(Top of Producing Interval). Item 8: The Kelly Bushing and Ground level elevations in feet above mean sea level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. Item 13:The API number reported to AOGCC must be 14 digits(ex:50-029-20123-00-00). Item 20:Report true vertical thickness of permafrost in Box 20.Provide MD and TVD for the top and base of permafrost in Box 28. Item 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. Item 23: If this well is completed for separate production from more than one interval(multiple completion),so state in item 1,and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced,showing the data pertinent to such interval). Item 26: Method of Operation: Flowing,Gas Lift, Rod Pump,Hydraulic Pump,Submersible,Water Injection,Gas Injection,Shut-in,or Other (explain). Item 27:Provide a listing of intervals cored and the corresponding formations,and a brief description in this box.Submit detailed description and analytical laboratory information required by 20 AAC 25.071. Item 29: Provide a list of intervals tested and the corresponding formation,and a brief summary of this box.Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Form 10-407 Revised 7/2009 • ConocoPhillips Time Log & Summary We/Mew Web Reporting Report Well Name: 2L-304 Rig Name: DOYON 16 Job Type: DRILLING ORIGINAL Rig Accept: 3/21/2010 12:00:00 PM Rig Release: Time Logs Date From To Dur S. Depth E.Depth Phase Code Subcode T Comment 03/17/2010 24 hr Summary RDMO MP-08&begin move to Kuparuk 2L-304 06:00 08:30 2.50 0 0 MIRU MOVE MOB P Move off rig off MPS-08 and spot on pad 08:30 12:00 3.50 0 0 MIRU MOVE MOB P Reconfigure BOP stack, remove single gate blind rams, remove 3.5"X6"VBR's F/lower rams, R/D floor equipment 12:00 18:30 6.50 0 0 MIRU MOVE MOB P Cont reconfigure BOP stack.3.5"XS', VBR btm pipe rams-mud X-blinds -4.5"X7"VBR top pipe rams- annular, load on traveling stand 18:30 19:30 1.00 0 0 MIRU MOVE MOB P Bridle up 19:30 20:30 1.00 0 0 MIRU MOVE MOB P R/D floor 20:30 21:30 1.00 0 0 MIRU MOVE MOB P Install rear boosters 21:30 22:00 0.50 0 0 MIRU MOVE MOB P Lay over derrick 22:00 00:00 2.00 0 0 MIRU MOVE MOB P Move f/MPUS-Pad to Texico pad access 03/18/2010 RDMO MP-08 and begin move to Kuparuk 2L 00:00 12:00 12.00 0 0 MIRU MOVE MOB P Cont.to move F/Texaco pad to Kuparuk 2-L pad 12:00 20:30 8.50 0 0 MIRU MOVE MOB P Cont.to move to Kuparuk 2L pad, tire failed in rear wheel well-4 miles from camp 20:30 00:00 3.50 0 0 MIRU MOVE MOB T Prep for tire C/O 03/19/2010 Replace 2 rear drillers side tires and continue to move to Kuparuk 2L-304 00:00 01:00 1.00 0 0 MIRU MOVE MOB T Remove Rear Booster 01:00 04:30 3.50 0 0 MIRU MOVE MOB T Prepare to remove rear spreader beam 04:30 07:30 3.00 0 0 MIRU MOVE MOB T Remove rear spreader beam 07:30 12:00 4.50 0 0 MIRU MOVE MOB T Prep&remove tire, prep&install new tire,drillers side rear 12:00 16:00 4.00 0 0 MIRU MOVE MOB T Remove other drillers side rear tire, prep&install new tire 16:00 18:30 2.50 0 0 MIRU MOVE MOB T Install&pin spreader beam,clear cellar of tools 18:30 19:30 1.00 0 0 MIRU MOVE MOB T Install Rear Boosters 19:30 00:00 4.50 0 0 MIRU MOVE MOB P Cont.to move to Kuparuk 2L-304 03/20/2010 Complete move to location, Ru cellar equip, install BOP on rig pedestal,spot rig over well,shim rig,raise derrick&RU floor,spot modules&slop tank, RU pit complex Page 1 of 23 Time Logs Date From To Dur S.Depth E.Depth Phase Code Subcode T Comment 00:00 01:30 1.50 0 0 MIRU MOVE MOB P Con't moving rig to location&spot rig on pad 01:30 09:30 8.00 0 0 MIRU MOVE MOB P PJSM, remove rear boosters, RU cellar equip,choke&kill hose, heaters,air, lines, koomey hose, etc., install BOP stack on rig pedestal, remove DS wind wall to allow room for diverter 09:30 11:00 1.50 0 0 MIRU MOVE MOB P Spot rig on well,shim rig&hang herculite in place of DS windwall 11:00 13:30 2.50 0 0 MIRU DRILL RURD P Raise derrick,pin&RU floor 13:30 14:30 1.00 0 0 MIRU DRILL RURD P Bridle down&hook up compensators 14:30 19:30 5.00 0 0 MIRU DRILL RURD P Spot modules,button up cellar& spot slop tank 19:30 00:00 4.50 0 0 MIRU DRILL RURD P RU pit complex 03/21/2010 Finished RU pit complex,spot&RU mudlogger&MWD shacks, load 5"DP in shed,make up 129 jts 5"DP &stood back in derrick,test LEL&H2S alarms,function test diverter&test TOTCO system,witnessed by AOGCC 00:00 12:00 12.00 0 0 MIRU DRILL RURD P Con't RU pit complex, install flow riser, MU knife valve fittings to diverter stack&function test,spot mud logger shack and begin RU, install bails&5"elevators. Accepted the rig at 12:00 hours 3/21/2010 12:00 14:30 2.50 0 0 MIRU DRILL RURD P Loading 5"DP in shed,function test diverter,take on hot water to new pits&test same, RU MWD encoder 14:30 21:30 7.00 0 0 MIRU DRILL PULD P Tally&make up 129 jts of 5"DP and stand back 21:30 00:00 2.50 0 0 MIRU WHDBO BOPE P Test LEL&H2S alarms, Totco system and function test diverter( closed in 30 sec.)witnessed by John Crisp w/AOGCC 03/22/2010 Finished MU 78 jts 5"DP,slip&cut 81'of drill line, MU jars&11 jts of 5"HWDP,press test pumps&lines to 3500#,C/O conductor pipe f/32'-121', Directional drill f/121'-637', ROP-77.8'/hr 00:00 03:30 3.50 0 0 SURFA( DRILL PULD P Cont.Tally&P/U 5"DP and Stand back 03:30 05:00 1.50 0 0 SURFA( RIGMNI SLPC P PJSM,Slip&Cut off 81'DrIg. line 05:00 07:00 2.00 0 0 SURFA( DRILL PULD P M/U 11 jts. HWDP&Stand Back 07:00 08:00 1.00 0 0 SURFA( DRILL PRTS P PT Mud lines&pumps @ 3,500 psi/ calibrate Sperry Sun Depth Tracker 08:00 09:30 1.50 0 0 SURFA( DRILL PULD P PJSM.M/U BHA 09:30 10:00 0.50 0 0 SURFA( DRILL DDRL P Clean out conductor from 0'-121' 10:00 11:00 1.00 0 225 SURFA( DRILL DDRL P Drill f/121'-225'w/50 RPM,3K free TQ,3-5K WOB,450 GPM,230 psi 11:00 12:00 1.00 225 0 SURFA( DRILL TRIP P TOOH with bit 12:00 15:00 3.00 0 0 SURFA( DRILL PULD P M/U drilling BHA,test MWD,Scribe, orient UBHO 15:00 17:00 2.00 0 225 SURFA( DRILL SRVY P PJSM.R/U Gyro survey tools& equip Page 2 of 23 Time Logs Date From To Dur S. Depth E.Depth Phase Code Subcode T Comment 17:00 19:00 2.00 225 441 SURFA( DRILL DDRL P Drill f/225'-441',5-10K WOB,550 gpm,890#,slide drill 148'and rot 68' 19:00 19:30 0.50 441 441 SURFA( DRILL SRVY P Ran Gyro survey @ 351', Inc-5.33, Az-95.74 19:30 21:30 2.00 441 534 SURFA( DRILL DDRL P Drill f/441'-534',5-15k WOB,590 GPM, 940#, 11-12k torque,slide drill-64', rot-29' 21:30 22:00 0.50 534 534 SURFA( DRILL SRVY P Ran Gyro survey @ 438', Inc-5.85, Az-94.47 22:00 23:30 1.50 534 637 SURFA( DRILL DDRL P Drill f/534'-627',5-15k WOB,590 GPM, 1060#, 11-12k torque,slide drill-63', rot-30' 23:30 00:00 0.50 637 637 SURFA( DRILL SRVY P Ran Gyro survey @ 533', Inc-6.57, Az-95.40 03/23/2010 Dir.drill 13 1/2"surface hole f/637'to 2336'MD 00:00 12:00 12.00 637 1,395 SURFA( DRILL DDRL P Cont.drilling f/637'-1395'. 15-30K WOB,550-590 GPM @ 1080 off BTM/1200-1300 psi on BTM, 10-12K TQ on&off BTM @ 60 RPM. Gyro to 1200'. 0 losses for tour AST=4.9 hrs ART=-1.7 hrs Jars=9.59 hrs 12:00 00:00 12.00 1,395 2,336 SURFA( DRILL DDRL P Cont.dir.drilling f/1395'to 2336'MD 25-30K WOB,675 GPM @ 1480 off BTM, 13-14K TQ on&off BTM @ 60 RPM. -PUW 93k-SOW 84k-ROW 90k -Max gas=2778 units at 1952'MD -0 losses for tour-0 losses for day -AST=4.46 hrs -ART=3.01 hrs -Jars= 7.47 hrs 03/24/2010 Dir.drill 13 1/2"surface hole f/2336' to 4223'MD 00:00 12:00 12.00 2,336 3,278 SURFA( DRILL DDRL P Continue Dir.drill f/2336'to 3278' MD-WOB 25-30k-70 RPM w/ 13-14k TQ-700 gpm w/1400 psi off btm -Losses for tour=0 -AST=1.28 hrs -ART=7.90 hrs 12:00 00:00 12.00 3,278 4,223 SURFA( DRILL DDRL P Continue Dir.drill f/3278'to 4223' MD -WOB 25-30k-80 RPM w/ 16-19k TQ-725 gpm w/1840 psi off btm -PUW 102k-SOW 90k-ROW 90k -Losses for tour=0-Day=0-Well =0 -AST= 1.27 hrs -ART= 6.68 hrs -Jars total hrs=34.19 03/25/2010 Dir.drill 13 1/2"surface hole to TD at 4310'MD(2407'TVD)-Circ.sweeps and circ.hole clean-BROOH to 541'(HWDP)-RIH-CBU X3-Spot Desco pill-POH-LD BHA Page 3 of 23 Time Logs Date From To Dur S.Depth E.Death Phase Code Subcode T Comment 00:00 01:00 1.00 4,223 4,310 SURFA( DRILL DDRL P Cont.drlg f/4223'-4310'.80 RPM. 16-19K free TQ.725 GPM-1860 psi 19 off BTM.25-30K WOB. 105K up, %AS 90K DN,95K RT.Qbtain final survey @ TD. 01:00 04:00 3.00 4,310 4,310 SURFA( DRILL CIRC P Pump w/20 bbl Hi-Vis sweep @ 700 gpm while RT&Recip. Pump total of 3 B.U.S. Sweep took extra 80 bbls to reach surface. 04:00 10:30 6.50 4,310 542 SURFA( DRILL TRIP P Back ream to HWDP w/60 RPM, 700 gpm,3-5 min.per stand.Obtain survey @ 2002'. 10:30 12:00 1.50 542 590 SURFA( DRILL WPRT P CBU 3X while RT.&Recip. Line up hi-side. RIH&tag tight spot @ 590' &work thru. -Losses for tour=0 bbls -AST=0 hrs -ART= 1.28 hrs 12:00 14:30 2.50 590 4,310 SURFA( DRILL WPRT P Continue RIH-Tag up at 690'- Screw in TD-Work through w/no issues-Continue RIH(Fill pipe at 2431')to bottom at 4310'-No fill 14:30 18:00 3.50 4,310 4,040 SURFA( DRILL CIRC P CBU 3X,staging up pumps to 750 gpm, 1830 psi-Stand back 1 std every 1/2 hr -pump 20 bbl weighted H.V.sweep -Spot 20 bbl Desco pill on btm 18:00 21:00 3.00 4,040 541 SURFA( DRILL TRIP P Pull 3 stds-Pump dry job-Blow down TD-POH-Observed 40k over pull at 1475'-Work through several times w/no issues-POH to 541' (top of HWDP) 21:00 00:00 3.00 541 0 SURFA( DRILL PULD P Stand back HWDP&jars-LD flex DC's-Download MWD 03/26/2010 Run&cement 10 3/4"casing 00:00 00:30 0.50 0 0 SURFA( DRILL PULD P Continue LD BHA 00:30 01:30 1.00 0 0 SURFA( DRILL PULD P Clear/Clean Rig floor 01:30 02:00 0.50 0 0 SURFA( DRILL CIRC P MU stack washer-Wash out diverter stack-LD stack washer-Blow down TD 02:00 05:00 3.00 0 0 SURFA( CASING RNCS P Hold PJSM w/all involved w/ upcomning operation-RU to run 1Q 3/4"surface casing-Make"dummy" run w/fluted hanger&landing joint- LD same 05:00 12:00 7.00 0 4,297 SURFA( CASING RNCS P Run Float jts-Fill pipe-Check floats -Continue RIH w/10 3/4"casing per program to 4266' -MU landing jt and hanger -Break circ.w/3 bpm,250 psi -Wash down and tag landing ring(10 3/4"shoe at 4297') -Stage pumps up 6 bpm,450 psi -PUW w/pumps 190k-SOW w/ pumps 120k Page 4 of 23 Time Logs Date From To Dur S.Depth E.Death Phase Code Subcode T Comment 12:00 13:30 1.50 4,297 4,297 SURFA( CASING CIRC P Continue to reciprocate pipe 30' strokes while pumping w/6 bpm,450 psi -Circ.total of 450 bbls 13:30 15:30 2.00 4,297 4,297 SURFA( CEMEN'PULD P RD Franks FU tool-Blow down TD- RU SLB cement head 15:30 17:00 1.50 4,297 4,297 SURFA(CEMEN"CIRC P Break circ and stage pumps up to 6 bpm,600 psi-Hold PJSM for upcomin• cement job 17:00 20:30 3.50 4,297 4,297 SURFA(CEMEN"CMNT P Give to Schlumberger-Pump 5 bbls H2O-Test lines to 3500 psi-OK- Cont.work pipe 30'strokes. -PUW 190k SOW 115 -Pump 50 bbls CW100 w/5 bpm, 175 psi -Pump 50 bbls 10.5 ppg Mud Push spacer w/4.8 bpm,480 psi -Drop btm plug -Pump 573.6 bbls lead at 10.7 ppg ASL(4.51 yield)-6 bpm,200 psi -Pump 119.4 bbls tail at 12.0 ppg C DeepCrete(1.62 yield)-6 bpm,400 'S Gin psi -Land casing-PUW 210k-SOW 95ik -Drop top plug-Pump 20 bbls H2O w/DS -Full returns throughout pumping„ proccess 20:30 22:00 1.50 4,297 4,297 SURFA(CEMEN"DISP P Give to rig for displacement- Displace cement w/9.7 ppg treated spud mud using mud pump#1 -8 bpm 930 psi-At 123 bbls away, slow pumps to 5 bpm,580 psi due to clabbered/contaminated mud returns and spill concerns. -At 1660 stks away(166.5 bbls), cement returns to surface. -Slow pumps to 4 bpm,570 psi -Bump plug at 3815 stks(382.7 bbls) away. Full returns during displacement -Pressure up to 1200 psi-Hold for 10 min -Bleed off and check floats-OK -216 bbls cement to surface -CIP at 21;40 hrs 22:00 23:00 1.00 4,297 4,297 SURFA(WHDBO NUND P Disconnect hyd. hoses f/knive valve -Flush annular w/treated water and work annular open&close. -Blow down and RD cement lines -RD cement head -B.O.and LD landing jt. 23:00 00:00 1.00 4,297 4,297 SURFA(WHDBO NUND P Clean contaminated mud from under rotary table. -Prep for ND diverter system -Drain surface riser -Clean cement valves Page 5 of 23 Time Logs Date From To Dur S. Depth E.Depth Phase Code Subcode T Comment 03/27/2010 24 hr Summary ND diverter system-NU BOPE-Test same 00:00 06:00 6.00 4,297 4,297 SURFA(WHDBO NUND P ND diverter line,20"annular and diverter spool-Move well head equip. into cellar-Clear rig floor of casing equipment 06:00 08:30 2.50 4,297 4,297 SURFA(WHDBO NUND P NU FMC Gen.5 wellhead system per FMC rep. -FMC rep.test metal to metal seal to 1000 psi f/10 min. 08:30 12:00 3.50 4,297 4,297 SURFA(WHDBO NUND P NU reducer spool-Choke&kill lines, koomey hoses. -SIM ops-Load and tally 119 jts 5" DP in shed -PU and position"Geo-Skid'on rig floor 12:00 14:30 2.50 4,297 4,297 SURFA(WHDBO NUND P Continue NU BOPE-Install turnbuckles,hole fill line -Obtain RKB lengths 14:30 15:30 1.00 4,297 4,297 SURFA(WHDBO NUND P RU to test BOPE -MU floor valves for testing-PU test jt-Set test plug -Function all BOP components -Greese BOP valves 15:30 16:30 1.00 4,297 4,297 SURFA( RIGMN1SVRG P Service rig-TD 16:30 17:00 0.50 4,297 4,297 SURFA(WHDBO BOPE P Fill all equip.w/water-Work air out of system in preparation for BOP test ?oe 17:00 18:30 1.50 4,297 4,297 SURFA(WHDBO BOPE P PJSM-Test BOPE per CPAI/ AOGCC rules and regulations 3 fr?. -Test annular to 250 psi low-2500 psi high -Trace down slow leak-Blind ram door seals leaking 18:30 19:30 1.00 4,297 4,297 SURFA( RIGMNT RGRP T PJSM/THA review. Drain BOP's- Pull test jt.-Break doors on DS blind rams -Change out door seals -Close and tigjhten doors 19:30 20:00 0.50 4,297 4,297 SURFA(WHDBO BOPE P Install test plug&test jt-RU to test BOP 20:00 00:00 4.00 4,297 4,297 SURFA(WHDBO BOPE P PJSM-Test BOPE per CPAI/ AOGCC rules and regulations -Test annular to 250 psi low-2500 psi high -Test all other components to 250 psi low-3500 psi high -NOTE:AOGCC Rep.Chuck Sheave waived witness of test 03/28/2010 RD BOP test-PU BHA#2-PU 5"DP- RIH-Test casing-Drill Float equip&cement 00:00 01:00 1.00 0 0 SURFA(WHDBO BOPE P RD BOP test equip.-Blow down all lines-Pull test plug-PU Wear ring. -Wear ring egged. Running tool would not"J"in -Order new Wear ring f/warehose 01:00 01:30 0.50 0 0 SURFA( DRILL PULD P Mobilize BHA to rig floor Page6of23 Time Logs Date From To Dur S.Depth E. Death Phase Code Subcode T Comment 01:30 02:30 1.00 0 0 SURFA( RIGMNT SVRG P Service TD-draw-works&skate- Inspect derrick 02:30 03:00 0.50 0 0 SURFA( DRILL PULD P Latch up jars from derrick-LD 6 1/4" jars-PU 6 1/4"jars -Stand back in derrick 03:00 04:30 1.50 0 0 SURFA( DRILL SEQP P Attempt to install wear ring- Ice in wellhead -Steam wellhead -Install wear ring-RILDS 04:30 08:00 3.50 0 327 SURFA( DRILL PULD P PU BHA#2-Upload MWD- Continue PU BHA 08:00 08:30 0.50 327 327 SURFA( DRILL DHEQ P Obtain shallow pulse test on MWD- OK 08:30 09:00 0.50 625 625 SURFA( DRILL TRIP P RIH w/HWDP&jars 09:00 09:30 0.50 625 625 SURFA( DRILL DHEQ P Calibrate MWD incoder/depth tracker 09:30 12:00 2.50 625 2,213 SURFA( DRILL PULD P PU 5"DP from shed to 2213' 12:00 15:00 3.00 2,213 4,043 SURFA( DRILL PULD P Continue PU 5"DP f/2213'to 4043' 15:00 16:30 1.50 4,043 4,193 SURFA( DRILL CIRC P Screw in TD-Break circ w/10 bpm, 920 psi -PUW 125k-SOW 70k-ROW 90k -Wash down f/4043'to 4193' 16:30 17:30 1.00 4,193 4,193 SURFA( DRILL PRTS P RU&test casing to 3000 psi f/30 _ min-Record on chart-Good test 17:30 18:00 0.50 4,193 4,193 SURFA( DRILL PRTS P RD test equip.-Blow down lines 18:00 00:00 6.00 4,193 4,213 SURFA(CEMEN"COCF P Screw in TD-Break circ.-Obtain SPR -Tag Plugs on top of F.C.at 4213' -Drilling plugs and F.C.w/5-10k WOB -40 RPM, 15k tq -340 gpm w/730 psi 03/29/2010 Clean out cmt.-Drill Shoe-drill 20'new hole-FIT to 16.0 ppg-Displace well w/9.6 ppg LSND-Dir.drill to 4895' 00:00 01:30 1.50 4,216 4,310 SURFA(CEMEN"COCF P Continue to clean out wet cement f/ 4216'to 4290'w/10.5 bpm, 950 psi -Tag hard cement at 4290' -Drill hard cement f/4290'to top of Shoe at 4294' -Control drill shoe w/2-5k WOB,40 RPM, 15k tq-10.5 bpm,950 psi -Break through shoe and clean out to TD at 4310' 01:30 02:00 0.50 4,310 4,330 SURFA( DRILL DDRL P Drill 20'of new hole per AOGCC regs.f/4310'to 4330' -WOB 15-20k-40 RPM w/15k tq- 10.5 bpm 950 psi 02:00 02:30 0.50 4,330 4,330 SURFA( DRILL CIRC P Pump 40 bbl H.V.sweep w/12 bpm, 1000 psi -R&R DP w/20 rpm Page 7 of 23 Time Logs Date From To Dur S.Depth E.Depth Phase Code Subcode T Comment 02:30 03:30 1.00 4,330 4,330 SURFA( DRILL FIT P Stand back 1 stand to 4290'bit depth -RU f/FIT/LOT -Perform FIT to 16.0 ppg EMW-MW 9.1 ppg,860 psi-2410'ND-Good FIT -SIM OPS while testing;Cleaning pits in prep for upcoming displacement 03:30 08:30 5.00 4,330 4,330 PROD1 DRILL COND P Clean pits in prep for upcoming displacement -Mix 60 bbls 9.8 ppg H.V.spacer -Fill pit#4 w/9.6+LSND mud 08:30 09:30 1.00 4,330 4,330 PROD1 DRILL CIRC P Pump 40 bbls H2O followed by 60 bbls Spacer, 12 bpm 2000 psi -Allow spacer to clear bit 09:30 12:00 2.50 4,330 4,534 PROD1 DRILL DDRL P Dir.drill f/4330'to 4543'while swapping to 9.6 ppg LSND mud WOB=5-20k-60 RPM w/20k tq- 725 gpm w/2600 psi -ART 1.86 hrs -AST 0 hrs -Jar hrs 1.86 12:00 15:00 3.00 4,534 4,632 PROD1 DRILL DDRL P Continue Dir.drill f/4534'to 4632' MD w/720 gpm,2550 psi 15:00 19:00 4.00 4,632 4,632 PROD1 RIGMNT RGRP T Thaw/Unplug equalizer line from extra pit module to mud pits 19:00 00:00 5.00 4,632 4,895 PROD1 DRILL DDRL P Dir.drill 4642'to 4895'w/w/720 gpm,2550 psi -PUW 105k-SOW 90k-ROW 96K -ART=3.65 hrs -AST=0.69 hrs -Jars=4.34 hrs 03/30/2010 Directional drill f/4895'to 6407'MD-Circ.sweeps-Circ.&cond mud for trip 00:00 12:00 12.00 4,895 6,030 PROD1 DRILL DDRL P Directional Drill f/4895'to 6030'MD- WOB,5-15k-650 gpm-2040 psi off btm,2550 on -100-120 RPM w/20k tq off btm,28k on -PUW 116k-SOW 92k-ROW 95k -Losses for tour=0 -AST=3.71 hrs -ART=3.23 12:00 21:30 9.50 6,030 6,405 PROD1 DRILL DDRL P Dir.drill f/ 6030'to 6407'MD-WOB 20-28k,650 gpm w/2800 psi on- 2550 psi off btm -100-120 RPM w/20-29k Tq on- 19-27k off btm. -PUW 115k-SOW 95k-ROW 104k -Pump H.V.sweep around f/17:00- 18:00 hrs-Clay balls observed at surface -AST=2.05 hrs -ART=1.48 hrs Page 8 of 23 Time Logs Date From To Dur S. Depth E.Death Phase Code Subcode T Comment 21:30 00:00 2.50 6,405 6,405 PROD1 DRILL CIRC P Pump 40 bbls H.V.sweep- -Circ.and condition mud in prep for trip -615 gpm,2170 psi -R&R DP w/30 rpms,20-22k tq 03/31/2010 BROOH to shoe-Circ. H.V.sweep around-Inspect TD-Continue BROOH to 820'-POH-Down load-LD BHA#2 00:00 01:00 1.00 6,405 6,405 PROD1 DRILL CIRC P Circulate and condition mud for upcoming trip -MW in 9.6 ppg-MW out 9.6 ppg 01:00 05:00 4.00 6,405 4,233 PROD1 DRILL TRIP P Backream f/6405'to 4233'(64'above 10 3/4"shoe). -100 rpm-650-700 gpm 05:00 06:30 1.50 4,233 4,233 PROD1 DRILL CIRC P Pump 40 bbls H.V.sweep w/6 bpm, 1850 psi-60 rpm -R&R DP 90'strokes -Fine cuttings and Clay"patties' observed at shakers w/sweep -Blow down Top Drive -Install Floor Safety valve in DP 06:30 11:00 4.50 4,233 4,233 PROD1 RIGMN1 RGRP T Trouble shooting TD to determine cause of excessive torque readings 11:00 12:00 1.00 4,233 3,600 PROD1 DRILL TRIP P Back ream out f/4233'to 3600' -60 RPM-650 gpm w/2050 psi 12:00 19:00 7.00 3,600 820 PROD1 DRILL TRIP P Continue backreaming out f/3600'to 820' -60 RPM w/24k tq-600 gpm, 1700 psi -Pull last 2 stands at 5 min to allow bottoms up 19:00 19:30 0.50 820 89 PROD1 DRILL TRIP P Stand back HWDP,jars&1 std Flex DC's 19:30 20:30 1.00 89 89 PROD1 DRILL PULD P Download MWD 20:30 22:30 2.00 89 0 PROD1 DRILL PULD P LD BHA Note:While pulling BHA through stack, hung up in wear ring due to clay buildup. Pull wear ring with BHA and recovered±4"diameter aluminum junk from Silver Bullet shoe(Nose?) 22:30 23:00 0.50 0 0 PROD1 DRILL PULD P Clean/Clear rig floor of BHA 23:00 00:00 1.00 0 0 PROD1 DRILL CIRC P MU stack washer(large amounts of clay stuck to riser) -RU Super Sucker on annulas valve to aid in clay removal f/BOP s tack/riser 04/01/2010 Wash stack-RIH w/muleshoe-Work on/Repair top Drive-POH w/muleshoe-PU BHA#3(Geo-Pilot)- PU DP-PU M-I Well Commander Sub-PU DP f/shed 00:00 01:30 1.50 0 0 PROD1 DRILL CIRC P Flush stack w/stack washer to remove heavy clays -Function pipe rams -Flush stack-Blow down TD 01:30 02:00 0.50 0 0 PROD1 DRILL OTHR P MU wear ring running tool -Install Wear ring -LD Run tool Page 9 of 23 Time Logs Date From To Dur S.Depth E.Depth Phase Code Subcode T Comment 02:00 03:00 1.00 0 2,066 PROD1 DRILL TRIP T MU muleshoe on 5"DP-RIH to 2066' 03:00 04:00 1.00 2,066 2,066 PROD1 DRILL CIRC T Circulate at 14 bpm,410 psi 04:00 11:00 7.00 2,066 2,066 PROD1 DRILL RGRP T Drain gear oil-Inspect gear box gears&bearings(good). -Remove blower assembly-Found broken coupling from DS drive motor to encoder -Replace coupling-Install blower assembly -Install inspection plate-Fill gear box w/recommended oil -Test TD/torque-w/120 RPM,5k tq at 2066' 11:00 12:00 1.00 2,066 2,066 PROD1 DRILL CIRC T Circulate w/15 bpm,510 psi -Losses for tour=0 12:00 12:30 0.50 2,066 2,066 PROD1 RIGMNT SVRG P Inspect TD-Check gear oil-Grease Swivel packing 12:30 14:00 1.50 2,066 0 PROD1 DRILL TRIP T Pull 1 stand DP-Blow down TD -POH f/2066'-LD muleshoe 14:00 15:00 1.00 0 0 PROD1 DRILL PULD P Clean rig floor-Mobilze GEO-Pilot BHA to rig floor -Confirm DP count in pipeshed 15:00 17:30 2.50 0 0 PROD1 DRILL PULD P PJSM on BHA-MU Geo-pilot and 9 7/8"HDBS FXG56s bit -Obtain measurements-Add spacers-Function test stationary barrel! 17:30 19:00 1.50 0 0 PROD1 DRILL PULD P Up load MWD 19:00 22:00 3.00 0 227 PROD1 DRILL PULD P RIH w/3 flex DC's&1 jt 5"DP -Shallow pulse test w/670 gpm 1540 psi-Good test on survey and down link Geo-Pilot -Pressure test Geo-Skid to 3500 psi (OK) -Break in seals on Geo-Pilot w/5-60 RPM -LD 1 jt DP&2 DC's -PJSM and load sources 22:00 22:30 0.50 227 646 PROD1 DRILL TRIP P RIH w/flex DC's and HWDP to 646' 22:30 00:00 1.50 646 1,494 PROD1 DRILL TRIP P RIH PU 5"DP from shed f/646 to 1494' -MU MI Swaco Well Commander Circ.sub and ball catcher 04/02/2010 RIH PU 5"DP-Swap to new 9.8 ppg LSND-Dir.drill f/6405'-7387'MD 00:00 01:00 1.00 1,494 1,494 PROD1 DRILL CIRC P At 1494',Screw in TD-Establish circ.w/600 gpm 1650 psi-drop ball to open Swaco Well Commander sub -Opened at 1950 psi-Circ.w/600 gpm 430 psi- -Drop ball to close sub-Closed at 2190 psi -Circ.w/600 gpm, 1650 psi 01:00 05:30 4.50 1,494 4,350 PROD1 DRILL TRIP P Continue RIH picking up 5"DP from shed to 4350' Page 10 of 23 Time Logs Date From To Dur S.Depth E. Depth Phase Code Subcode T Comment 05:30 07:30 2.00 4,350 6,247 PROD1 DRILL TRIP P RIH w/5"DP from derrick-Screw in TD at 5014'-Pump and rotate through tight-OK -Continue RIH to 6247' 07:30 09:30 2.00 6,247 6,405 PROD1 DRILL REAM P Screw in TD-Obtain parameters -Wash&ream per Sperry recommendations f/6247'to 6343'w/ 160 RPM -6 bpm w/690 psi NOTE:Displace well w/new 9.8 ppg LSND during reaming operations -Continue to ream f/6343'to TD at 6405' 09:30 12:00 2.50 6,405 6,627 PROD1 DRILL DDRL P Dir.drill f/6405'to 6627'MD-WOB 5-7k -620-650 gpm 1920-2030 psi off btm- 1990-2030 on btm -170 RPM w/6k tq off-7-8k tq on btm -PUW 116k-SOW 96k-ROW 105K -ART=1.49 hrs -Jars=16.30 hrs 12:00 23:00 11.00 6,627 7,293 PROD1 DRILL DDRL P Dir. Drill f/6627'to 7293'MD WOB= 3-12k -620-650 gpm, 1940-2380 psi on- 1920-2350 off btm -170 RPM w/6.5-8k tq on-5.5-7k tq off btm -PUW 116k=-SOW 96k-ROW 105k 23:00 23:30 0.50 7,293 7,293 PROD1 RIGMN7 SVRG P Service rig-Inspect TD 23:30 00:00 0.50 7,293 7,387 PROD1 DRILL DDRL P Dir. Drill f/7293'to 7387'MD WOB= 3-12k -620-650 gpm, 1940-2380 psi on- 1920-2350 off btm -170 RPM w/6.5-8k tq on-5.5-7k tq off btm -PUW 116k=-SOW 96k-ROW 105k -Total bit hrs=7.39 -ADT=5.9 hrs -Jars total=22.2 Losses for day=0 bbls 04/03/2010 Dir Drill f/7387'to 8999'MD 00:00 12:00 12.00 7,387 8,270 PROD1 DRILL DDRL P Dir. Drill f/7387'to 8270'-WOB 4-8k 170 RPM,9k tq off, 10k tq on btm -700 gpm,3090 psi on,3070 psi off btm -Bit hrs=13.95 -Jar hrs=28.76 Page 11 of 23 Time Logs Date From To Dur S. Depth E.Depth Phase Code Subcode T Comment 12:00 00:00 12.00 8,270 8,999 PROD1 DRILL DDRL P Continue to Dir. Drill f/8270'to 8999' MD-WOB 2-12k-170 RPM,8-12K tq on,7-8k off btm -645-700 gpm,2880-3120 psi on, 2860-3040 psi off btm -PUW 142k-SOW 105k-ROW 115k -ADT=5.22 -Total bit hrs=19.17 04/04/2010 Dir. Drill f/8999'to 9921'MD- -Drill string packed off-Pull to 9722' -Establish circ.-Pump Nut plug sweep-Circ. hole clean -Ream hole f/9722'to 9921' -Dir. Drill f/9921'to 10,223' 00:00 12:00 12.00 8,999 9,880 PROD1 DRILL DDRL P Dir. Driil f/8999'to 9880'MD-WOB 5-10k-170 RPM,7-8k tq off, 12k tq on btm. -670-700 gpm,3290 psi-PUW 160k -SOW 105k-ROW 116k -ADT=6.95 hrs -Jars=40.93 hrs -Drilling ECD's at crew change= 11.;72 12:00 12:30 0.50 9,880 9,921 PROD1 DRILL DDRL P Dir.drill f/9880'to 9921'-WOB 5-10k -170 RPM, 10k tq off, 12k tq on btm -675 gpm,3290 psi- -PUW 160k-SOW 105k-ROW 116k 12:30 17:00 4.50 9,921 9,722 PROD1 DRILL REAM T Drill string packed off at 9921'/4072' TVD(Bit depth)-Slow pumps, attempt to pick up -Slack off and taking wt-PU to string weight, establish rotation w/100 RPM- Back ream stand out w/no pump to 9847'-PU single joint,pressure up to 350 psi.Slowly pull up w/no rotary and pressure holding at±240 psi.. Pull to 9771'. Establish circ.w/ 4 spm,300 psi.Slowly stage pumps up to 59 SPM,870 psi,23-28%flow. Establish rotation w/30 RPM,9k tq. Continue to stage pumps up to 79 SPM, 1120 psi, 32%flow. -At 1450 hrs,flow decreased to 17%. Stop pumps.Slowly pull up to 9722' (4014'TVD). -Establish circ.slowly w/3 SPM, 310 psi.Stage pumps up slowly to 650 GPM,3160 psi,41%flow. -Establish rotation w/100 RPM, 11k Tq. 17:00 19:30 2.50 9,722 9,921 PROD1 DRILL CIRC T Circulate to clean hole and pump 40 bbls nut plug sweep around -Ream hole f/9722'to 9921'w/ 100-150 RPM w/11k tq -670 gpm,3230 psi Page 12 of 23 Time Logs Date From To Dur S. Depth E.Depth Phase Code Subcode T Comment 19:30 00:00 4.50 9,921 10,223 PROD1 DRILL DDRL P Continue Dir. Drilling f/9921'to 10,223'MD-WOB 5-12k -170 RPM w/10-12k tq on,9-11k tq off btm -PUW 160k-SOW 105k-ROW 120k -ADT=2.88-Bit hrs=26.42 hrs- Jars=43.51 hrs -ECD's while drilling=11.46 04/05/2010 Dir. Drill f/10,223-10,947'MD-BROOH to 9376'-RIH to bottom-Open Well commander sub -Obtain parameters-backream out of hole to 8613' 00:00 09:30 9.50 10,223 10,947 PROD1 DRILL DDRL P Dir. Drill f/10,223-10,947'MD- 650-670 GPM,3510 psi-WOB 5-10k -170 RPM w/15k tq on, 12k off btm -Pump Nutplug sweeps every±300' -PUW 167k-SOW 109k-ROW 121k -ECD's max=11.79 -Total bit hrs=35.67-ADT=6.97- Jars=50.48 hrs 09:30 10:00 0.50 10,947 10,947 PROD1 DRILL CIRC T PJSM on Backream out-Continue to pump N.P.sweep around -RU Mud bucket etc.for BROOH 10:00 12:00 2.00 10,947 10,412 PROD1 DRILL REAM T Back Ream out of hole f/10,947'to 10,412'-650 GPM,3400 psi -170 RPM w/13k tq -PUW 158k-SOW 119k-ROW 110k -Max Ecd's=11.70 12:00 15:00 3.00 10,412 9,376 PROD1 DRILL REAM T Continue backream out f/10,412'to 9376'w/650 GPM 3200 psi -170 RPM w/11k tq -PUW 155k-SOW-110k-ROW 115k 15:00 15:30 0.50 9,281 9,376 PROD1 DRILL TRIP T Blow down TD-Observe well-RD mud bucket-Line up Trip tank 15:30 16:30 1.00 9,376 10,879 PROD1 DRILL TRIP T RIH on elevators f/9376'to 10,879' w/no issues 16:30 18:00 1.50 10,879 10,945 PROD1 DRILL CIRC T Screw in TD-Obtain parameters- As precaution,wash last 66'to btm. -Drop 2 1/8"ball-Pump down w/3 bp,410 psi -Observe ball seat at 84 bbls away -Pressure up to 1500 psi-Increase pressure in 100 psi increments -Observe Well Commander Sub open w/3530 psi -Obtain pressure readings w/600 gpm, 1870 psi 18:00 00:00 6.00 10,945 8,613 PROD1 DRILL REAM T Back ream out of hole f/10,945'to 8613'w/800 gpm,2900 psi initial to 2250 psi,46%flow -170 RPM w/13k Tq.-ROW 120k -Adding water to to reduce mud weight at 61 bbls/hr Page 13 of 23 Time Logs Date From To Dur S.Depth E.Depth Phase Code Subcode T Comment 04/06/2010 24 hr Summary Continue BROOH from 8613'to shoe at 800 GPM's-2000 PSI.CBU inside the shoe from the circulation port. Drop ball,close port with 2600 PSI,continue CBU x 3 at the bit.Slip&cut drilling line.Adjust rails on top drive torque tube.Stage in hole,circ'I every 2000'.Wash&ream 255'to bttm.,displace old mud with clean LSND mud 00:00 09:30 9.50 8,613 4,256 PROD1 DRILL REAM T Continue BROOH from 8613'-shoe @ 4256'. Pumps at 800 Gpms-2000 PSI. 170 RPM's-10K TQ. 09:30 10:00 0.50 4,256 4,256 PROD1 DRILL CIRC T Circulate bottoms up through MI circulating valve.780 GPM's-1050 PSI. 10:00 10:30 0.50 4,256 4,256 PROD1 DRILL CIRC T Drop 2 1/4"ball in drill string, allow to seat. Pressure up in 200 PSI increments from 1500 PSI to 2600 PSI to observe valve closing. Establish circulation at 700 GPM's- 2700 PSI to verify closed valve. 10:30 11:30 1.00 4,256 4,256 PROD1 DRILL CIRC T Continue circulate bottoms up x 2 from the bit at 690 GPM's-2560 PSI. 11:30 13:30 2.00 4,256 4,256 PROD1 RIGMNT SLPC T RU. Slip&cut 95'of drilling line. Inspect saver sub,grease&inspect Top Drive. Crew Change 13:30 14:00 0.50 4,256 4,256 PROD1 DRILL SFTY T Held PJSM with crew. Discuss safety&hazard recognition issues. Discuss and review procedure to adjust rails on on torque tube. 14:00 16:00 2.00 4,256 4,256 PROD1 RIGMNT EQRP T Adjust torque tube rails.SIMOPS: Clean pits&prep for mud swap. 16:00 21:00 5.00 4,256 10,692 PROD1 DRILL TRIP T RIH w/BHA#3 f/4297'-10692',circ'l open hole volume every 2000' 21:00 22:00 1.00 10,692 10,947 PROD1 DRILL WASH T Wash&ream f/10692'-10947'@ 8 BPM w/1060 psi,40 RPM's w/10k TQ 22:00 00:00 2.00 10,947 10,947 PROD1 DRILL CIRC T PJSM for fluid swap,pump 40 bbl hi-vis sweep and displaced old mud with new LSND mud @ 11.5 BPM, rotate&reciprocate pipe @ 120 RPM's w/13K TQ 04/07/2010 Dir drlg f/10,947'-12,772',MW-9.6, ECD-10.65 00:00 00:30 0.50 10,947 10,947 PROD1 DRILL CIRC T Con't displacing mud,476 GPM @ 1370 PSI, 120 RPM, 13K TQ, Line up to new mud pits,obtain SPR w/ new mud.SPR @ 10945',#1 pump- 30 SPM=260#,40 SPM=350#,#2 pump-30 SPM=260#,40 SPM= 330# 00:30 10:30 10.00 10,947 11,770 PROD1 DRILL DDRL P Drlg f/10947'-11770',stage pump rate up to 575 GPM-1680#@ 10947',700 GPM-2250#@ 10990', 725 GPM-2510#@ 11355',750 GPM-3080#@ 11490',TQ on bttm -14K,TQ off bttm-13K, 750 GPM- 3130#, PUW-173K,SOW-116K, ROT wt-131K, 170 RPM, ECD- 10.55,pump 40 bbl nut plug sweep @11259'&11735' Page 14 of 23 Time Logs Date From To Dur S.Depth E.Depth Phase Code Subcode T Comment 10:30 11:00 0.50 11,770 11,770 PROD1 RIGMNT RGRP P C/O swab on#1 pump,circ'I @ 390 GPM-1000#,work pipe 100 RPM, 12K TQ 11:00 00:00 13.00 11,770 12,772 PROD1 DRILL DDRL P Drlg f/11770'-12772'(TVD= 4917.83'), RPM's-170,WOB- 12K-16K, 14K TQ,750 GPM- 3250#, ROT WT-135K, PUW 180K, SOW-120K,pumped 40 bbl nut plug sweep @ 12045'&12340', ECD -10.65,max gas @ 12535(TVD- 4849')w/151 units Bit hrs-50.03,Jar hrs-64.84,ART- 7.45,ADT-7.45 04/08/2010 Circ'I,open circ'I valve, increased pump rate to 890 GPM,short trip to 10920',close circ'I valve, RIH to 12772', drlg f/12772'-13840' 00:00 01:00 1.00 12,772 12,772 PROD1 DRILL CIRC P Pump 40 bbl nut plug sweep @ 12772'and circ'l to surf @ 750 GPM -3200#off bttm, 13K, ECD-10.67, PJSM BROOH,Monitor well 5 min, no flow 01:00 02:00 1.00 12,772 12,772 PROD1 DRILL CIRC P Drop 2.125"ball,chase @ 106 GPM -190#,press up to 1400#, increase press in 200#increments until circ'I sub opened @ 2200#,est crc'l @ 755 GPM-1030# 02:00 06:00 4.00 12,772 10,920 PROD1 DRILL TRIP P BROOH f/12772'-10920', RPM- 150,TQ-14k,GPM-890 @ 2420# 06:00 07:00 1.00 10,920 10,920 PROD1 DRILL CIRC P Drop 2.125"ball,monitor well 5 min, no flow,chase ball @ 106 GPM- 160#,press to 1400#, increase press in 200#increments until circ'l sub opened @ 2200#,est circ'I @ 66 GPM-2550# 07:00 08:30 1.50 10,920 12,772 PROD1 DRILL TRIP P RIH f/10920'-12772',no fill 08:30 00:00 15.50 12,772 13,840 PROD1 DRILL DDRL P Dir drlg f/12772'-13840'(TVD- 5394'), RPM-130,WOB-9K,TQ- 14K,GPM-650 @ 2760#, ROT WT -150K, PUW-215K,SOW-124K, MW-9.6, ECD-10.52 slowed pump rate&RPM to get RSS back on dir plan,obtain slow pump rates, blow thru choke&kill lines before entering the Bermuda formation,slowed ROP to 50'/hr as per geoligist @ 13800' Bit hrs-58.94,Jar hrs-73.75,ART- 7.14,ADT-7.14 04/09/2010 Drill f/13840'-14071', repairs on#2 pump 10 hrs, lost 10k string wt&2000#pump press,open circ'I valve, start POOH w/drill pipe,AOGCC was notified of BOP test @ 09:30 4/9/2010 00:00 06:30 6.50 13,840 14,071 PROD1 DRILL DDRL P Drlg f/13840'-14071'(TVD=5524'), RPM's-150,WOB-10K, 19K TQ, 650 GPM-3400#, ROT WT-148K, PUW 225K,SOW-120K, ECD- 10.4 Bit hrs-54.45,Jar hrs-79.26,ART-5.51,ADT-5.51 Page 15 of 23 Time Logs Date From To ' Dur S.Depth E. Depth Phase Code Subcode T Comment 06:30 16:30 10.00 14,071 14,071 PROD1 DRILL RGRP T PJSM,CIO shock hose on#2 pump, circ'l w/#1 pump-388 GPM,due to length of repairs to change out#2 shock hose, BROOH f/14071'- 12772',466 GPM @ 1530#, RPM- 150, 17K TQ,Monitor well, no flow, PJSM, RIH f/12772'-14008',circ'l @ 735 GPM-1480#, RPM-120, 16K TQ,C/O shock hose on#2 pump& press test to 3400# 16:30 19:30 3.00 14,071 14,071 PROD1 DRILL CIRC T Bring on both pumps a 725 GPM- 2130#,press loss of 2000#,lost 10K string weight,drop ball&opened circ'l valve @ 2600#,showed circ'l valve was not opened before dropping ball 19:30 00:00 4.50 14,071 10,131 PROD1 DRILL TRIP T Flow check well-no flow, B/O&B/D TD,start POOH f/14008'-10131' 04/10/2010 POOH w/5"DP, LD 3800'of 5"DP,stand back 3 stds 5"HWDP,found jars parted, BOP test,witnessed by Jeff Jones(AOGCC), PU fishing BHA&start pu 5"DP 00:00 03:00 3.00 10,131 4,067 PROD1 DRILL TRIP T Con't POOH f/10131'-4067',flow check-no flow,CIO 5'elevators 03:00 08:30 5.50 4,067 0 PROD1 DRILL PULD T PJSM, LD DP f/4067'-665',Stand back 3 stds 5"HWDP,found Weatherford jars parted length of Jar rec-17.1 ' 2'of BHA in ,.. it hole, OF @ 137 ' 08:30 09:30 1.00 0 0 PROD1 WHDBO BOPE T Clean&c ear rig floor,drain BOP stack,function BOP rams, Flush BOP w/wtr, Pull wear ring 09:30 10:30 1.00 0 0 PROD1 WHDBO BOPE T Set lower test plug,flush stack, re-set test plug, RU to test BOP 10:30 18:00 7.50 0 0 PROD1 WHDBO BOPE T PJSM,Test BOP 250#low,3500# _ high, ran chart w/3.5"&5"test jts, n pull test plug,drain stack re-set test a4l- plug,test BOP's to 250#lo&3500# Vl��jQl high recorded on chart, BOP test witnessed by Jeff Jones(AOGCC) 18:00 19:00 1.00 0 0 PROD1 WHDBO BOPE T R/D test equip, blow down lines, install 9-15/16"wear ring 19:00 20:30 1.50 0 0 PROD1 DRILL PULD T PU 8-1/8"OS w/6-1/8"grapple, 8-1/8"OS ext,top sub, BS,6-1/4" Jars, 11 jts 5"HWDP&6-1/4" intensifier 20:30 00:00 3.50 0 0 PROD1 DRILL PULD T PU 200 JTS 5"DP 04/11/2010 Slip&cut drill line,con't RIH w/overshot,break circ'l @ 5096',6045',7945', 11247'&12665',circ'l down to TOF @ 13776',work over fish and had 20K overpull,circ'l BU, POOH w/DP 00:00 00:30 0.50 0 0 PROD1 DRILL PULD T PU 12 jts 5"DP 00:30 02:30 2.00 0 0 PROD1 RIGMNT SLPC T PJSM,slip&cut drill line,cic'I 212 GPM-130#,service&inspect top drive, inspect saver sub 02:30 11:00 8.50 3,863 12,265 PROD1 DRILL TRIP T Con't RIH f/3863'-12265',break circ'l @ 5096',6045',7945', 11247', 12665, GPM-210 @230# Page 16 of 23 Time Logs Date From To Dur S.Depth E.Depth Phase Code Subcode T Comment 11:00 13:30 2.50 12,665 13,616 PROD1 DRILL FISH T Wash down f/12665'-13616',GPM- 316 @ 260#, MU TD&establish parameters, PUW-205K,SOW- 105K w/pumps off, PUW-198K, SOW-110K, Rot wt-145K @ 10K TQ,w/pumps on,GPM-126 @ 290#, RIH&tag TOF(a)13776',work over fish,saw 20K overpull,TQ increased 2K, increased GPM-775 @ 2710# 13:30 15:00 1.50 13,616 13,616 PROD1 DRILL CIRC T Circ'I BU,GPM-775 @ 2640#,SD pumps,monitor well, no flow 15:00 20:30 5.50 13,616 3,581 PROD1 DRILL TRIP T Pump out 5 stds 5"DP,GPM-126 @ 270#, B/D TD&POOH to 3581' 20:30 23:00 2.50 3,581 1,784 PROD1 DRILL TRIP T LDDP f/3581'-1784' 23:00 00:00 1.00 1,784 0 PROD1 DRILL RGRP T Clean&clear rig floor, PJSM,MU OS w/6"grapple, left out stop&PU BHA 04/12/2010 POOH w/OS, no fish,cut-lip guide had grooves on one side, RIH w/fishing BHA&DP,break circ'l 4 times during trip,est parameters,worked over TOF&latch fish,saw increase in PSI&had MWD pulse,start POOH w/pumps on, pulling tight f/13333'-13137'&pulled off fish, RIH,went over fish,could not latch onto fish, POOH w/DP 00:00 01:00 1.00 1,784 367 PROD1 DRILL PULD T Con't LDDP f/1784'-367' 01:00 02:00 1.00 367 0 PROD1 DRILL PULD T Stand back HWDP, PJSM, LD intensifier,did not recover fish,break down OS&cutlip guide,found grooves on one side of guide but did not get fish inside guide 02:00 03:30 1.50 0 0 PROD1 RIGMNT RGRP T Clean&clear rig floor,clean draworks drip pan 03:30 13:30 10.00 0 13,776 PROD1 DRILL TRIP T PJSM,MU&RIH w/OS w/new cut-lip guide, BS,jars, 11 jts 5" HWDP,intensifier&422 jts 5"DP, break circ'l @ 6047',7947', 10125',& 12567' 13:30 14:30 1.00 13,776 13,776 PROD1 DRILL FISH T Obtain parameters as follows: PUW- 195K,SOW-112K w/pump off, PUW-205K,SOW-105K ROT WT -145K @ 10 RPM&9.5K w/pump on, GPM-210 @ 390#,con't RIH to TOF @ 13776',worked over TOF& latched onto fish,saw PSI increase f/ 390#-570#, increased pump rate to 450 GPM @ 1750#w/MWD pulse, had 25K overpull 14:30 17:00 2.50 13,776 13,137 PROD1 DRILL TRIP T Start pulling pipe,pumping out of the hole slowly,GPM-462 @ 1760#, started pulling tight f/13333'-13137' &pulled off fish 17:00 18:30 1.50 13,137 13,776 PROD1 DRILL FISH T RIH&tag fish @ 13776',worked over TOF,saw 270#PSI increase in PP, could not grab a hold of fish,kept pulling off 18:30 00:00 5.50 13,776 5,736 PROD1 DRILL TRIP T PJSM,monitor well, no flow, BD/TD, POOH w/268 jts 5"DP Page 17of23 Time Logs Date From To Dur S.Depth E.Depth Phase Code Subcode T -Comment 04/13/2010 24 hr Summary POOH w/OS,fish had been inside OS,grapple teeth worn, RIH w/6"grapple&left stop out,break circ'I 6 times going in hole,worked over TOF 4-1/2',saw increase in PSI&started getting MWD pulses,could not get grapple to bite,made 6 attempts w/no success,circ'l&condition mud, POOH w/DP to BHA 00:00 03:30 3.50 5,736 0 PROD1 DRILL TRIP T Con't POOH w/50 jts 5"DP, PJSM, LD 96 jts 5"DP 03:30 04:30 1.00 0 0 PROD1 DRILL PULD T LD intensifier,Stand back HWDP, did not recover fish, PJSM,break down OS&cutlip guide,grapple teeth were not sharp,fish had been all the way to stop in OS 04:30 05:30 1.00 0 0 PROD1 DRILL PULD T Clean&clear rig floor, PJSM, MU OS w/6"grapple,left out stop&�F U BHA 05:30 14:00 8.50 0 13,522 PROD1 DRILL TRIP T PU 96 jts 5"DP, monitor well, no flow, RIH w/318 jts 5"DP, break circ'I @ 4244',6047', 7947',8799', 12567'&13522' 14:00 15:30 1.50 13,522 13,776 PROD1 DRILL FISH T Obtain parameters as follows: Pump off=PUW-205K,SOW-100K, Pump on=PUW-200K,SOW- 105K, ROT WT-145K @ 10 RPM& 11K,GPM-210 @ 390#,con't RIH to TOF @ 13776', increased pump rate to 450 GPM @ 2050#,worked over TOF 4-1/2',saw PSI increase to 2640#,w/MWD pulse, made 6 attempts but could not get grapple to bite 15:30 17:00 1.50 13,776 13,776 PROD1 DRILL CIRC T Circ'I&condition mud, BD/TD 17:00 00:00 7.00 13,776 0 PROD1 DRILL TRIP T PJSM,monitor well, no flow, POOH w/318 jts 5"DP, LD 96 jts 5"DP 04/14/2010 POOH w/OS,fish had been inside OS,grapple teeth worn, RIH w/2 OS bowls w/6-1/8"&6"grapples,break circ'I 6 times going in hole,worked over TOF 9', had MWD pulses,caught fish,pump out of hole to 11534', spot lube pill @ 13528', POOH w/5"DP to fishing BHA 00:00 00:30 0.50 0 0 PROD1 DRILL PULD T LD intensifier,Stand back HWDP, did not recover fish, PJSM, break down OS&cutlip guide,grapple teeth were not sharp,fish had been all the way to top sub 00:30 01:00 0.50 0 0 PROD1 RIGMNTSVRG T Clean&clear rig floor 01:00 05:30 4.50 0 0 PROD1 DRILL TRIP T PJSM,MU 2-OS bowls w/6-1/8"& 6"grapples, left out stop,extension, bumper sub,jars,circ'l sub, 11 jts 5" HWDP&intensifier, PU 96 jts 5"DP 05:30 06:30 1.00 0 0 PROD1 RIGMNT SLPC T PJSM,slip&cut drill line,circ'I @ 170 GPM-80#,service top drive, inspect saver sub,clean out drawworks drip pan 06:30 12:30 6.00 0 12,863 PROD1 DRILL TRIP T Con't RIH w/318 jts 5"DP, Break circ'I @ 6253',7953', 9841'. 11729'& 12863' Page 18 of 23 Time Logs Date From To Dur S. Depth E. Depth Phase Code Subcode T Comment 12:30 13:30 1.00 12,863 13,776 PROD1 DRILL FISH T M/U TD,obtain parameters as follows: =PUW-205K,SOW- 105K, Pump on=PUW-200K, SOW-105K, ROT WT-150K @ 10RPM&10K TQ,GPM-390 @ 360#,con't RIH to TOF @ 13776', worked over fish,shut off rotation, increased pump rate to 462 GPM @ 1840#w/MWD pulse,pushed over fish 9',caught fish&start out of hole 13:30 00:00 10.50 13,776 0 PROD1 DRILL TRIP T Pump out of hole slowly to 11534', pump 40 bbl lube&graphite pill @ 13528',shut off pumps&POOH w/ 246 jts 5"DP, LD 96 jts 5"DP to fishing BHA 04/15/2010 LD fishing BHA&fish,download data, PU BHA#5,drop ball,close circ'l sub,test MWD, RIH w/5"DP,est drlg parameters,drlg f/14071-14123' 00:00 01:00 1.00 0 0 PROD1 DRILL PULD T PJSM, UD fishing BHA,bttm 1/2 /" combo jar(did not recover spring), 3 U) jts 5"HWDP&2 non-mag DC's (recovered all of fish) 01:00 03:00 2.00 0 0 PROD1 DRILL PULD T PJSM, remove Nuke sources f/BHA 03:00 05:00 2.00 0 0 PROD1 DRILL PULD T Downloading data f/MWD, housekeeping around rig 05:00 06:30 1.50 0 0 PROD1 DRILL PULD T PJSM, L/D Geo Pilot drilling assembly BHA 06:30 08:30 2.00 0 0 PROD1 DRILL PULD T PJSM,M/U mud motor drilling BHA #5 08:30 10:00 1.50 0 0 PROD1 DRILL PULD T Download MWD 10:00 11:00 1.00 0 0 PROD1 DRILL PULD T P/U 1 jt 6-3/4"flex DC, PJSM, load nuke sources 11:00 13:00 2.00 0 2,500 PROD1 DRILL PULD T Finish P/U BHA#5 13:00 22:00 9.00 2,500 14,071 PROD1 DRILL TRIP T Drop ball&close circ'l sub @ 2500#, shallow hole test MWD, PU 96 jts 5" DP, RIH out of derrick w/324 jts 5" DP,filling pipe every 20 stds 22:00 00:00 2.00 14,071 14,123 PROD1 DRILL DDRL P M/U TD,establish drlg parameters, Pump off=PUW-225K,SOW- 120K, Pump on=PUW-223K, SOW-117, Rot Wt-159K&19K free TQ,drill f/14071'-14123',650 GPM @ 2990#,geologist wanted penetration rate of 50'/hr Bit Hrs= 1.15,Jar Hrs=1.15,ADT =1.15,ART=1.15 04/16/2010 Drlg f/14123'-14340',CBU 1-1/2 times, BROOH to 13800',MAD pass f/14200'-13800',drop ball&open circ'l sub,pump out of hole f/13800'-7863', LDDP to 4256',CBU 00:00 06:00 6.00 14,123 14,340 PROD1 DRILL DDRL P prig f/14123'-14340'TD,TVD, • 5686',TD called by geologist, 100 RPM w/20K TQ, PUW-225K,SOW -125K, ROT Wt-160K,GPM-640 @ 3140#, ECD-10.25 Bit hrs-6.35,Jar hrs-6.35,ART- 6.35 Page 19 of 23 Time Logs Date From To Dur S.Depth E. Depth Phase Code Subcode T Comment 06:00 08:00 2.00 14,340 14,340 PROD1 DRILL CIRC P CBU 1-1/2 times,GPM-650 @3110# 08:00 11:00 3.00 14,340 14,200 PROD1 DRILL REAM P Backream out of hole f/14340'- 14200',MAD pass f/14200'-13800', 100 RPM w/20K TQ,GPM-650 @ 3100# 11:00 11:30 0.50 14,200 14,340 PROD1 DRILL CIRC P Drop ball&opened circ'I valve @ 2600#,increased GPM-900 @ 2950# 11:30 19:30 8.00 13,800 7,863 PROD1 DRILL TRIP P Pump out of hole f/13800'-7863', GPM-900 @ 2330# 19:30 23:30 4.00 7,863 4,256 PROD1 DRILL PULD P B/O&B/D TD, LDDP f/7863'-4256' 23:30 00:00 0.50 4,256 4,256 PROD1 DRILL CIRC P CBU 900 GPM @ 1650# 04/17/2010 Finish LDDP, LD nukes&download data, LD BHA#5, install 7-5/8"pipe rams&test BOP's,test good, AOGCC called but did not witness, RU csg equip, bull nose broke off FS,W/O new FS jt, ran 78 jts 7-5/8" csg 00:00 04:00 4.00 4,256 854 PROD1 DRILL PULD P Con't LDDP f/4256'-854' 04:00 05:00 1.00 854 0 PROD1 DRILL PULD P LD circ'I sub,6 jts 5"DP, 11 jts 5" HWDP,jars&2 flex DC's 05:00 06:30 1.50 0 0 PROD1 DRILL PULD P PJSM,pull nukes&download 06:30 08:00 1.50 0 0 PROD1 DRILL PULD P Finished LD BHA#5 08:00 08:30 0.50 0 0 PROD1 RIGMNT SVRG P Clear&clean rig floor 08:30 09:30 1.00 0 0 PROD1 RIGMNT SLPC P PJSM,slip&cut 88'of drill line 09:30 14:00 4.50 0 0 PROD1 WHDBO BOPE P Pull wear bushing, install 7-5/8"pipe rams, install test plug,test BOP to 250#low&3500#high,chart both, 3�r good test.Chuck Sheve w/AOGCC notified @ 18:15 4/15/2010,did not witness BOP test 14:00 17:00 3.00 0 0 COMPZ CASING RNCS P PJSM,gather csg jewelry, R/U to run csg 17:00 17:30 0.50 0 0 COMPZ CASING RNCS P PJSM, PU shoe jt&bull nose on sloat shoe busted off 17:30 20:00 2.50 0 0 COMPZ CASING OTHR T Wait on new shoe jt to be delivered f/ warehouse 20:00 00:00 4.00 0 3,097 COMPZ CASING RNCS P Ran FS,2 jts 7-5/8"csg, FC,&76 C,5 Its 7-5/8"csq to 3097'per program 04/18/2010 RIH w/7-5/8"29.7#L-80 BTCM csg to 14340',circ'l&condition mud, rec pipe 30', pump w/109.6 bbls 15.8#/cal cmt,displace w/654.5 sea water,bump plug w/1800#,floats held OK,WOC 00:00 14:00 14.00 3,097 14,340 COMPZ CASING RNCS P Con't RIH w/282 jts 7-5/8"L-80 29.7#BTCM csg,f/3097'-14338', took PUW&SOW every 20 jts& broke circ'I every 40 jts,circ'l 7 BPM @ 730#, PUW-290K, SOW-115K 14:00 15:00 1.00 14,340 14,340 COMPZ CASING PULD P R/D Franks FU tool&csg handling equip,B/D TD&RU cmt head 15:00 17:00 2.00 14,340 14,340 COMPZ CEMEN"CIRC P Circ'l 8 BPM @ 920#,condition mud while reciprocating pipe 30', RU Schlumberger Cementers Page 20 of 23 Time Logs Date From To Dur S.Depth E.Depth Phase Code Subcode T Comment 17:00 19:30 2.50 14,340 14,340 COMPZ CEMEN"CMNT P PJSM,Press test surface lines to 3500#,con't rec pipe 30',pump 30 bbls CW100=5 BPM @ 580#,31.3 bbls Mudpush II spacer @ 11.5#/gal =4.2 BPM @ 460#„drop bttm plug, pump 109.6 bbls tail slurry @ 15.8#/gal=6.4 BPM @ 1320#,drop top plug,switch to rig&displace w/ C 654.5 bbls seawater-8 BPM @ 720#,slow pumps to 4 BPM @ LS 900#,bump plug(19:24 4/18/10)@ 6526 stks(654.5 bbls),had full returns during displacement, pressure up to 1800#,bled off& floats holding OK 19:30 20:00 0.50 14,340 14,340 COMPZ DRILL PRTS P Test csg to 3500#ran 30 min chart, held OK 20:00 00:00 4.00 14,340 14,340 COMPZ WHDBO BOPE P WOC-4 hrs, RD cmt head&circ'l equip,prep for BOP nipple down, load,drift&tally 3-1/2"tbg,do pipe rams 04/19/2010 Set slips&cut csg,Test BOP's,Chuck Steve w/AOGCC notified but did not witness,freeze protect 7-5/8" annulus w/171 bbls diesel, LD 206 jt 5"DP f/derrick, load 3-1/2"tbg in pipe shed,drift&tally 3-1/2"tbg 00:00 06:00 6.00 14,340 14,340 COMPZ WHDBO NUND P Set emergency slips,cut 7-5/8"csq, UD cut-off csq,install pack-off, NU BOP's,test pack-off&BOP break to 3800# 06:00 07:30 1.50 14,340 14,340 COMPZ WHDBO BOPE P Install test plug, RU&perform body test on BOP's,250#low&3500# high and chart, RD test equip,pull test plug, install 7"ID wear ring, Chuck Sheve w/AOGCC notified but did not witness 07:30 09:30 2.00 14,340 14,340 COMPZ DRILL PULD P LD 50 jts 5"DP f/derrick 09:30 12:00 2.50 14,340 14,340 COMPZ DRILL FRZP P RU to freeze protect 7-5/8"X 10-3/4" annulus, press test lines to 3000#, pump @ 1 BPM&formation broke down @ 500#, increased rate to 3 BPM @ 370#,pump 190 bbls sea water,rates&press was chart recorded, Little Red Services pumped 171 bbls diesel,2.5 BPM @ 400#ICP, 500#FCP 12:00 18:00 6.00 14,340 14,340 COMPZ DRILL PULD P Finished LD 156 jts 5"DP out of derrick 18:00 00:00 6.00 14,340 14,340 COMPZ DRILL PULD P Load 3-1/2"tbg in pipe shed,drift& tally tbg,pull wear ring 04/20/2010 Load&talley 3 1/2"tubing-Run 3 1/2"completion per program to 13,805'WLEG depth 00:00 02:30 2.50 0 0 COMPZ RPCOM PUTB P Continue to load&talley 3 1/2" tubing SIMOPS:Continue to clean pits 02:30 12:00 9.50 0 6,303 COMPZ RPCOM RCST P PJSM on running 3 1/2" completion -RIH w/3 1/2"9.3#EUE 8rd mod tubing per program to 6303' Page 21 of 23 Time Logs Date From To Dur S. Depth E.Depth Phase Code Subcode T Comment 12:00 13:30 1.50 6,303 6,303 COMPZ RPCOM PUTB P RU SBS chemical injection equipment -Mobilize clamps,tools -MU Camco KBMG-LTS Chem. injection mandrel&lines 13:30 23:00 9.50 6,303 13,805 COMPZ RPCOM RCST P Continue to run 3 1/2"completion per program to WLEG depth of 13,805' -Ran 428 jts+1 extra joint+1 extra 2'pup to depth of 13,805' -PUW 125k-SOW 60k -NOTE: Ran total of 113 full and 7 half Cannon clamps 23:00 00:00 1.00 13,805 13,805 COMPZ RPCOM CRIH P RU head pin and lines for pumping corrosion inhibited seawater 04/21/2010 Ran 3 1/2"completion-Set pkr-Tested IA&tubing-ND BOP/NU tree- -Test all well head equip.-Freeze protect-Release Rig 00:00 03:30 3.50 13,805 13,805 COMPZ RPCOM CRIH P Press.test lines to 3500 psi(OK)- -Pump 120 bbls 8.5 ppg seawater w/ corrosion inhibitor w/3 bpm,250 psi -RD circ.head-Drop ball&Rod assembly-RU circ. head -Pump B&Ron seat w/12 bbls,3 bpm -Pressure to 2000 psi-Increase to 2500 psi to set packer-Hold f/10 min -Bleed to 200 psi-Pull up&shear PBR free w/20k over 03:30 05:30 2.00 13,805 13,805 COMPZ RPCOM THGR P LD extra tubing joint&2'pup jt-PU hanger -Terminate and pressure test Chem. injection line to 5000 psi(OK) -Land tubing-RILDS-pressure to 300 psi to ensure engaghed in PBR -B.O. landing jt-Blow down T.D. 05:30 07:30 2.00 13,805 13,805 COMPZ RPCOM PRTS P Pressure test tubin• to 3500 psi f/30 , min on chart-Good test-Bleed tubing to 2000 psi- -Press.test IA to 3000 psi f/30 min_. on chart-Good test -Bleed tubing and shear DCK-2 S.V. -Confirm circulation-Down tubing w/ 3 bpm, 1050 psi-Down annulus w/3 bpm, 560 psi 07:30 10:00 2.50 13,805 13,805 COMPZ WHDBO NUND P Rd and blow down all circ. lines -Install BPV per FMC Rep. -PJSM on upcoming ops -Drain BOP' -ND,samg 10:00 11:00 1.00 13,805 13,805 COMPZ WHDBO NUND P Terminate Chem. inj. line-Install SBMS seal-Warm up adapter flange 11:00 13:30 2.50 13,805 13,805 COMPZ WHDBO NUND P NU adapter flange-Test to 5000 psi f/10 min per FMC Rep- -Test Chem. Inj. line to 5000 psi per FMC Rep. Page 22 of 23 Time Logs Date From To Dur S. Depth E.Depth Phase Code Subcode T Comment 13:30 15:00 1.50 13,805 13,805 COMPZ WHDBO NUND P NU 3 1/8"x 5k Tree-Open actuator -Pull BPV per FMC Rep. -Install test plug-Test tree to 5000 psi-Good test -FMC pull test plug 15:00 18:00 3.00 13,805 13,805 COMPZ DRILL FRZP P PJSM w/Little Red-RU circ. lines -Test lines to 2500 psi -Reverse circ. 130 bbls Diesel freeze protect w/1 bpm,525 psi 18:00 19:30 1.50 13,805 13,805 COMPZ DRILL FRZP P RU and"U Tube"freeze protect 19:30 20:30 1.00 13,805 13,805 COMPZ DRILL FRZP P Suck back diesel w/Little Red and RD same -Install BPV 20:30 21:30 1.00 13,805 13,805 COMPZ DRILL RURD P Blow down and RD surface lines -Secure tree 21:30 23:00 1.50 13,805 13,805 COMPZ DRILL DMOB P Clean and suck out cellar -SIMOPS:Move slop tank and support modules 23:00 00:00 1.00 13,805 13,805 COMPZ DRILL DMOB P Take pressure readings-Secure well -Move rig off well and stage in center of pad -Released Rig at 24:00 hrs -NOTE: IA PSI=0 -Tubing PSI =0 -OA psi=500 Page 23 of 23 2L-304 Well Events Summary DATE SUMMARY 5/18/10 STAND BY FOR WX. PULLED BALL& ROD FROM 13791' RKB. PULLED SOV FROM 13528' RKB. IN PROGRESS. 5/20/10 SET DV @ 13528' RKB. OPENED CMU @ 13681' RKB. CIRCULATED 590 BBL DSL, TAKING RETURNS TO PROD. CLOSED CMU @ 13681' RKB. IN PROGRESS. 5/21/10 MIT TBG 3500 PSI, PASSED. MIT IA 3500 PSI, PASSED. PULLED RHC PLUG BODY @ 13791' RKB. OPENED CMU @ 13681' RKB TO ENABLE PUMPING GUNS DOWN. DRIFTED WITH 2.5"x 17' DUMMY GUN; TAGGED @ 14178' SLM. READY FOR E/L. 5/22/10 PERFORMED PERFORATION OPERATIONS: PERFORATED AT A DEPTH FROM 14000'TO 14020' USING 2.5" BY 20' GUN, WITH 6 SPF, 60 DEG PHASING, DEEP PENETRTATING PROSPECTOR CHARGES. 5/23/10 AFTER PERFORATIONS, CONTINUED WAITNG ON PHASE 2 CONDITIONS AND HIGH WINDS. RIGGED DOWN FROM WELL HEAD AFTER WINDS SUBSIDED. 5/23/10 WAIT ON SNOW REMOVAL. CLOSED CMU @ 13681' RKB. TESTED IA TO 3500 PSI, PASSED. MEASURED BHP @ 14010' RKB: 2747 PSI. READY FOR FRAC. 5/24/10 COMPLETED T2 FRAC TO FLUSH WITH 9 PPA ON FORMATION. FRAC PUMPED TO 110% DESIGN. PUMPED A TOTAL OF 268,205 LBS OF 16/20 CARBOLITE PLACING 267,010 LBS BEHIND PIPE. FREEZE PROTECTED TUBING WITH 44 BBL OF DIESEL. 5/25/10 Flowback in Progress 5/26/10 PERFORMED POST-FRAC CLEANOUT FROM INITIAL TAG AT 13,888' CTMD, DOWN TO HARD TAG AT 14,242' CTMD, PUMPING SLICK-DIESEL AND DIESEL GEL AT 2.0-BPM; ESTIMATE 222' RATHOLE BELOW BOTTOM PERFS AT 14,020'. MAINTAINED 1:1 RETURNS THROUGHOUT CLEANOUT; MODERATE TO HEAVY FRAC SAND CONCENTRATIONS IN RETURN STREAM DURING GEL PILLS. TURNED SHUT-IN, FREEZE-PROTECTED WELL BACK TO DSO. READY FOR SLICKLINE POST-FRAC WORK. 5/27/10 ATTEMPT RIG UP, JOB SUSPENDED DUE TO CLOSE PROXIMITY TO CTU OPERATIONS. 5/28/10 DRIFT TBG TO 2.73" &TAGGED @ 14,108' SLM. PULLED DV @ 13,528' RKB, SET 5/16" OV @ SAME. COMPLETE z s ConocoPhillips(Alaska) Inc. 4 = Kuparuk River Unit Kuparuk 2L Pad 2L-304 50103206130000 -.] . Sperry Drilling Services Definitive Survey Report 27 April, 2010 -I 1 i . .: e i HALLIBURTON ' ., Sperry Drilling Services 1 ConocoPhillips (Alaska) Inc. Definitive Survey Report Company: ConocoPhillips(Alaska)Inc. Local Co-ordinate Reference: Well 2L-304 Project: Kuparuk River Unit TVD Reference: 2L-304 @ 142.18ft(D16(114.9+25.45+1.83)) Site Kuparuk 2L_Pad MD Reference: 2L-304 @ 142.18ft(D16(114.9+25.45+1.83)) Well: 2L-304 North Reference: True wellborn: 2L-304 Survey Calculation Method: Minimum Curvature Design: 2L-304 Database: CPAI EDM Production Project Kuparuk River Unit Map System: US State Plane 1927(Exact solution) System Datum: Mean Sea Level Geo Datum: NAD 1927(NADCON CONUS) Using Well Reference Point Map Zone: Alaska Zone 04 Using geodetic scale factor Well 2L-304 Well Position +N/-S 0.00 ft Northing: 5,927,698.48 ft Latitude: 70°12'48.306 N +E/-W 0.00 ft Easting: 461,092.72 ft Longitude: 150°18'49.619 W !Position Uncertainty 0.00 ft Wellhead Elevation: ft Ground Level: 114.90ft Weiibore 2L-304 Magnetics Model Name Sample Date Declination Dip Angle Field Strength (°) (e) (nT) BGGM2009 3/20/2010 21.46 80.70 57,627 Design 2L-304 Audit Notes: Version: 1.0 Phase: ACTUAL Tie On Depth: 27.28 Vertical Section: Depth From(TVD) +W-S +E/-W Direction (ft) (ft) (ft) r) 27.28 0.00 0.00 97.42 Survey Program Date From To (ft) (ft) Survey(Welibore) Tool Name Description Survey Date 76.00 818.00 2L-304 Gyro(1)(2L-304) GYD-GC-SS Gyrodata gyro single shots 3/23/2010 1: 869.38 869.38 2L-304 MWD(2L-304) MWD+IFR-AK-CAZ-SC MWD+IFR AK CAZ SCC 3/24/2010 1: 910.00 910.00 2L-304 Gyro(2)(2L-304) GYD-GC-SS Gyrodata gyro single shots 3/24/2010 1: 961.28 4,258.71 2L-304 MWD(R100)(2L-304) MWD+IFR-AK-CAZ-SC MWD+IFR AK CAZ SCC 3/23/2010 1: 4,320.43 6,358.80 2L-304 MWD(R200)(2L-304) MWD+IFR-AK-CAZ-SC MWD+IFR AK CAZ SCC 3/29/2010 1: 6,399.96 13,975.86 2L-304 MWD(R300)(2L-304) MWD+IFR-AK-CAZ-SC MWD+IFR AK CAZ SCC 4/2/2010 12: 14,055.99 14,295.27 2L-304 MWD(R400)(2L-304) MWD+IFR-AK-CAZ-SC MWD+IFR AK CAZ SCC 4/16/2010 t Survey Map Map Vertical MD Inc Azi TVD TVDSS +N/-S +E/-W Northing Easting DLS Section (ft) (°) (°) (ft) (ft) (ft) (ft) (ft) (ft) (°/ice') on Survey Tool Name 27.28 0.00 0.00 27.28 -114.90 0.00 0.00 5,927,698.48 461,092.72 0.00 0.00 UNDEFINED 76.00 0.23 122.37 76.00 -66.18 -0.05 0.08 5,927,698.43 461,092.80 0.47 0.09 GYD-GC-SS(1) 171.00 0.18 248.70 171.00 28.82 -0.21 0.10 5,927,698.27 461,092.82 0.39 0.13 GYD-GC-SS(1) 261.00 1.23 102.65 260.99 118.81 -0.47 0.92 5,927,698.00 461,093.63 1.54 0.97 GYD-GC-SS(1) 351.00 5.33 95.74 350.83 208.65 -1.10 6.02 5,927,697.35 461,098.73 4.57 6.11 GYD-GC-SS(1) 438.00 5.85 94.47 437.41 295.23 -1.85 14.46 5,927,696.55 461,107.17 0.61 14.58 GYD-GC-SS(1) 533.00 6.57 95.40 531.85 389.67 -2.74 24.70 5,927,695.61 461,117.40 0.77 24.84 GYD-GC-SS(1) 629.00 7.60 96.65 627.12 484.94 -3.99 36.47 5,927,694.30 461,129.17 1.08 36.68 GYD-GC-SS(1) 725.00 9.24 97.76 722.08 579.90 -5.77 50.41 5,927,692.45 461,143.10 1.72 50.74 GYD-GC-SS(1) 4/27/2010 9:39:34AM Page 2 COMPASS 2003.16 Build 69 ConocoPhillips (Alaska) Inc. Definitive Survey Report Company: ConocoPhillips(Alaska)Inc. Local Co-ordinate Reference: Well 2L-304 Project Kuparuk River Unit TVD Reference: 2L-304©142.18ft(D16(114.9+25.45+1.83)) Site: Kuparuk 2L_Pad MD Reference: 2L-304 @ 142.18ft(D16(114.9+25.45+1.83)) Well: 2L-304 North Reference: True Wellbore: 2L-304 Survey Calculation Method: Minimum Curvature Design: 2L-304 Database: CPAI EDM Production Survey Map Map Vertical MD Inc Azi TVD TVDSS +N/-S +E1-W Northing Easting DLS Section (ft) (°) r) (ft) (ft) (ft) (ft) (ft) (ft) (.1100') (ft) Survey Tool Name 818.00 15.75 99.84 812.83 670.65 -8.94 70.27 5,927,689.18 461,162.94 7.02 70.84 GYD-GC-SS(1) 869.38 19.59 97.49 861.78 719.60 -11.25 85.69 5,927,686.79 461,178.34 7.60 86.42 MWD+IFR-AK-CAZ-SC(2) 910.00 21.58 98.76 899.80 757.62 -13.28 99.82 5,927,684.69 461,192.46 5.02 100.70 GYD-GC-SS(3) 961.28 22.70 95.50 947.30 805.12 -15.66 118.99 5,927,682.20 461,211.62 3.24 120.02 MWD+IFR-AK-CAZ-SC(4) 1,056.82 25.78 91.86 1,034.41 892.23 -18.10 158.12 5,927,679.56 461,250.73 3.58 159.13 MWD+IFR-AK-CAZ-SC(4) 1,153.00 28.59 91.45 1,119.96 977.78 -19.37 202.04 5,927,678.07 461,294.64 2.93 202.85 MWD+IFR-AK-CAZ-SC(4) 1,247.62 30.53 95.39 1,202.27 1,060.09 -22.20 248.61 5,927,675.00 461,341.18 2.90 249.39 MWD+IFR-AK-CAZ-SC(4) 1,340.76 38.06 98.28 1,279.17 1,136.99 -28.56 300.65 5,927,668.37 461,393.19 8.27 301.82 MWD+IFR-AK-CAZ-SC(4) 1,389.03 40.41 97.96 1,316.55 1,174.37 -32.87 330.87 5,927,663.90 461,423.38 4.89 332.35 MWD+IFR-AK-CAZ-SC(4) 1,439.06 40.81 98.20 1,354.53 1,212.35 -37.45 363.11 5,927,659.16 461,455.60 0.86 364.91 MWD+IFR-AK-CAZ-SC(4) 1,532.50 43.70 94.72 1,423.70 1,281.52 -44.46 425.53 5,927,651.83 461,517.97 3.98 427.70 MWD+IFR-AK-CAZ-SC(4) 1,627.38 46.98 93.24 1,490.38 1,348.20 -49.12 492.84 5,927,646.82 461,585.25 3.63 495.06 MWD+IFR-AK-CAZ-SC(4) 1,718.44 50.46 92.80 1,550.45 1,408.27 -52.72 561.16 5,927,642.87 461,653.55 3.84 563.27 MWD+IFR-AK-CAZ-SC(4) 1,813.17 53.78 93.01 1,608.60 1,466.42 -56.51 635.83 5,927,638.70 461,728.18 3.51 637.80 MWD+IFR-AK-CAZ-SC(4) 1,908.16 58.62 92.06 1,661.43 1,519.25 -59.98 714.66 5,927,634.82 461,806.99 5.16 716.42 MWD+IFR-AK-CAZ-SC(4) 1,953.62 60.38 92.15 1,684.50 1,542.32 -61.42 753.80 5,927,633.18 461,846.12 3.88 755.42 MWD+IFR-AK-CAZ-SC(4) 2,002.47 62.61 93.57 1,707.82 1,565.64 -63.57 796.67 5,927,630.81 461,888.98 5.23 798.21 MWD+IFR-AK-CAZ-SC(4) 2,096.26 67.15 94.16 1,747.62 1,605.44 -69.30 881.38 5,927,624.64 461,973.64 4.87 882.95 MWD+IFR-AK-CAZ-SC(4) 2,190.78 70.15 95.49 1,782.03 1,639.85 -76.71 969.08 5,927,616.78 462,061.30 3.43 970.88 MWD+IFR-AK-CAZ-SC(4) 2,283.76 72.83 96.80 1,811.55 1,669.37 -86.16 1,056.74 5,927,606.88 462,148.89 3.18 1,059.01 MWD+IFR-AK-CAZ-SC(4) 2,378.19 71.87 97.39 1,840.18 1,698.00 -97.27 1,146.03 5,927,595.31 462,238.12 1.18 1,149.00 MWD+IFR-AK-CAZ-SC(4) 2,470.46 74.32 97.81 1,867.01 1,724.83 -108.95 1,233.53 5,927,583.18 462,325.55 2.69 1,237.27 MWD+IFR-AK-CAZ-SC(4) 2,565.24 75.95 97.94 1,891.32 1,749.14 -121.50 1,324.27 5,927,570.17 462,416.22 1.72 1,328.87 MWD+IFR-AK-CAZ-SC(4) 2,661.77 74.23 97.95 1,916.16 1,773.98 -134.39 1,416.65 5,927,556.80 462,508.52 1.78 1,422.15 MWD+IFR-AK-CAZ-SC(4) 2,755.36 74.68 97.09 1,941.24 1,799.06 -146.19 1,506.04 5,927,544.54 462,597.84 1.01 1,512.31 MWD+IFR-AK-CAZ-SC(4) 2,850.95 74.08 96.80 1,966.98 1,824.80 -157.33 1,597.43 5,927,532.94 462,689.16 0.69 1,604.37 MWD+IFR-AK-CAZ-SC(4) 2,944.98 72.86 96.70 1,993.73 1,851.55 -167.92 1,686.94 5,927,521.88 462,778.61 1.30 1,694.50 MWD+IFR-AK-CAZ-SC(4) 3,038.58 71.82 96.82 2,022.12 1,879.94 -178.42 1,775.51 5,927,510.93 462,867.11 1.12 1,783.69 MWD+IFR-AK-CAZ-SC(4) 3,129.64 71.26 96.54 2,050.96 1,908.78 -188.47 1,861.30 5,927,500.44 462,952.84 0.68 1,870.05 MWD+IFR-AK-CAZ-SC(4) 3,227.09 70.82 97.14 2,082.62 1,940.44 -199.44 1,952.81 5,927,489.00 463,044.28 0.74 1,962.21 MWD+IFR-AK-CAZ-SC(4) 3,322.65 71.52 97.15 2,113.46 1,971.28 -210.69 2,042.55 5,927,477.29 463,133.95 0.73 2,052.65 MWD+IFR-AK-CAZ-SC(4) 3,416.20 72.39 97.12 2,142.44 2,000.26 -221.74 2,130.81 5,927,465.78 463,222.15 0.93 2,141.60 MWD+IFR-AK-CAZ-SC(4) 3,509.96 71.83 98.14 2,171.24 2,029.06 -233.59 2,219.24 5,927,453.48 463,310.51 1.20 2,230.82 MWD+IFR-AK-CAZ-SC(4) 3,604.15 72.23 98,65 2,200.30 2,058.12 -246.67 2,307.88 5,927,439.95 463,399.07 0.67 2,320.41 MWD+IFR-AK-CAZ-SC(4) 3,697.87 73.61 98.80 2,227.83 2,085.65 -260.26 2,396.42 5,927,425.90 463,487.53 1.48 2,409.97 MWD+IFR-AK-CAZ-SC(4) 3,793.51 74.27 98.78 2,254.29 2,112.11 -274.30 2,487.25 5,927,411.39 463,578.28 0.69 2,501.85 MWD+IFR-AK-CAZ-SC(4) 3,888.79 74.02 99.12 2,280.32 2,138.14 -288.56 2,577.79 5,927,396.67 463,668.74 0.43 2,593.47 MWD+IFR-AK-CAZ-SC(4) 3,984.07 73.09 99.65 2,307.29 2,165.11 -303.46 2,667.95 5,927,381.31 463,758.81 1.11 2,684.80 MWD+IFR-AK-CAZ-SC(4) 4,078.81 72.63 99.58 2,335.21 2,193.03 -318.58 2,757.21 5,927,365.73 463,847.98 0.49 2,775.26 MWD+IFR-AK-CAZ-SC(4) 4,173.19 73.25 98.98 2,362.90 2,220.72 -333.13 2,846.25 5,927,350.72 463,936.94 0.89 2,865.44 MWD+IFR-AK-CAZ-SC(4) 4/27/2010 9:39:34AM Page 3 COMPASS 2003.16 Build 69 ConocoPhillips (Alaska) Inc. Definitive Survey Report Company: ConocoPhillips(Alaska)Inc. Local Co-ordinate Reference: Well 2L-304 Project: Kuparuk River Unit TVD Reference: 2L-304 @ 142.18ft(D16(114.9+25.45+1.83)) Site: Kuparuk 2L_Pad MD Reference: 2L-304 @ 142.18ft(D16(114.9+25.45+1.83)) Well: 2L-304 North Reference: True Wellbore: 2L-304 Survey Calculation Method: Minimum Curvature Design: 2L-304 Database: CPAI EDM Production Survey Map Map Vertical MD Inc Azi TVD TVDSS +N/-S +E-/-W Northing Easting DLS Section (ft) (°) (') (ft) (ft) (ft) (ft) (ft) (ft) (°/100') (ft) Survey Tool Name 4,258.71 72.98 98.38 2,387.74 2,245.56 -345.48 2,927.15 5,927,337.95 464,017.76 0.74 2,947.25 MWD+IFR-AK-CAZ-SC(4) 4,320.43 72.76 96.44 2,405.92 2,263.74 -353.09 2,985.64 5,927,330.05 464,076.20 3.02 3,006.23 MWD+IFR-AK-CAZ-SC(5) 4,374.77 73.01 98.25 2,421.91 2,279.73 -359.73 3,037.14 5,927,323.14 464,127.67 3.22 3,058.16 MWD+IFR-AK-CAZ-SC(5) 4,474.40 74.07 96.71 2,450.14 2,307.96 -372.16 3,131.87 5,927,310.22 464,222.32 1.82 3,153.71 MWD+IFR-AK-CAZ-SC(5) 4,570.13 75.31 96.38 2,475.42 2,333.24 -382.68 3,223.60 5,927,299.23 464,313.99 1.34 3,246.03 MWD+IFR-AK-CAZ-SC(5) 4,661.88 76.56 95.80 2,497.72 2,355.54 -392.12 3,312.09 5,927,289.33 464,402.42 1.49 3,335.00 MWD+IFR-AK-CAZ-SC(5) 4,753.01 77.19 95.19 2,518.41 2,376.23 -400.62 3,400.44 5,927,280.38 464,490.71 0.95 3,423.70 MWD+IFR-AK-CAZ-SC(5) 4,850.26 77.81 93.90 2,539.46 2,397.28 -408.14 3,495.08 5,927,272.37 464,585.30 1.44 3,518.52 MWD+IFR-AK-CAZ-SC(5) 4,944.70 76.58 92.75 2,560.39 2,418.21 -413.49 3,587.01 5,927,266.55 464,677.20 1.76 3,610.37 MWD+IFR-AK-CAZ-SC(5) 5,040.65 75.19 92.86 2,583.79 2,441.61 -418.04 3,679.95 5,927,261.52 464,770.11 1.45 3,703.12 MWD+IFR-AK-CAZ-SC(5) 5,137.90 74.19 92.60 2,609.47 2,467.29 -422.51 3,773.64 5,927,256.57 464,863.76 1.06 3,796.61 MWD+IFR-AK-CAZ-SC(5) 5,228.22 73.64 91.78 2,634.49 2,492.31 -425.83 3,860.36 5,927,252.81 464,950.46 1.06 3,883.03 MWD+IFR-AK-CAZ-SC(5) 5,326.39 73.17 91.58 2,662.53 2,520.35 -428.59 3,954.40 5,927,249.57 465,044.47 0.52 3,976.64 MWD+IFR-AK-CAZ-SC(5) 5,419.57 72.98 91.93 2,689.66 2,547.48 -431.32 4,043.50 5,927,246.38 465,133.55 0.41 4,065.35 MWD+IFR-AK-CAZ-SC(5) 5,513.62 72.19 92.56 2,717.81 2,575.63 -434.83 4,133.17 5,927,242.40 465,223.19 1.06 4,154.72 MWD+IFR-AK-CAZ-SC(5) 5,604.15 72.74 92.46 2,745.08 2,602.90 -438.61 4,219.41 5,927,238.18 465,309.40 0.62 4,240.72 MWD+IFR-AK-CAZ-SC(5) 5,701.70 72.27 91.82 2,774.41 2,632.23 -442.08 4,312.38 5,927,234.22 465,402.34 0.79 4,333.37 MWD+IFR-AK-CAZ-SC(5) 5,792.90 72.02 92.25 2,802.37 2,660.19 -445.17 4,399.14 5,927,230.69 465,489.07 0.53 4,419.79 MWD+IFR-AK-CAZ-SC(5) 5,888.37 71.70 92.32 2,832.09 2,689.91 -448.78 4,489.79 5,927,226.61 465,579.70 0.34 4,510.15 MWD+IFR-AK-CAZ-SC(5) 5,979.93 71.96 91.89 2,860.65 2,718.47 -451.98 4,576.73 5,927,222.97 465,666.60 0.53 4,596.77 MWD+IFR-AK-CAZ-SC(5) 6,072.57 73.49 92.75 2,888.16 2,745.98 -455.56 4,665.11 5,927,218.93 465,754.96 1.87 4,684.88 MWD+IFR-AK-CAZ-SC(5) 6,169.91 73.26 91.94 2,916.01 2,773.83 -459.38 4,758.30 5,927,214.63 465,848.12 0.83 4,777.78 MWD+IFR-AK-CAZ-SC(5) 6,262.60 72.46 89.83 2,943.32 2,801.14 -460.75 4,846.86 5,927,212.80 465,936.66 2.34 4,865.77 MWD+IFR-AK-CAZ-SC(5) 6,358.80 71.41 89.66 2,973.16 2,830.98 -460.34 4,938.31 5,927,212.74 466,028.11 1.10 4,956.41 MWD+IFR-AK-CAZ-SC(5) 6,399.96 71.79 90.19 2,986.15 2,843.97 -460.29 4,977.37 5,927,212.59 466,067.16 1.53 4,995.13 MWD+IFR-AK-CAZ-SC(6) 6,500.90 70.75 90.00 3,018.56 2,876.38 -460.45 5,072.96 5,927,211.94 466,162.74 1.05 5,089.95 MWD+IFR-AK-CAZ-SC(6) 6,593.76 69.89 89.75 3,049.83 2,907.65 -460.26 5,160.40 5,927,211.68 466,250.17 0.96 5,176.62 MWD+IFR-AK-CAZ-SC(6) 6,690.80 69.55 90.10 3,083.47 2,941.29 -460.14 5,251.42 5,927,211.33 466,341.18 0.49 5,266.87 MWD+IFR-AK-CAZ-SC(6) 6,783.42 69.44 89.96 3,115.91 2,973.73 -460.19 5,338.17 5,927,210.84 466,427.92 0.18 5,352.90 MWD+IFR-AK-CAZ-SC(6) 6,879.90 69.81 90.11 3,149.50 3,007.32 -460.24 5,428.62 5,927,210.31 466,518.36 0.41 5,442.60 MWD+IFR-AK-CAZ-SC(6) 6,974.69 70.35 90.69 3,181.80 3,039.62 -460.87 5,517.73 5,927,209.23 466,607.46 0.81 5,531.05 MWD+IFR-AK-CAZ-SC(6) 7,069.58 71.19 91.36 3,213.05 3,070.87 -462.47 5,607.31 5,927,207.17 466,697.02 1.11 5,620.08 MWD+IFR-AK-CAZ-SC(6) 7,162.75 71.54 91.15 3,242.82 3,100.64 -464.40 5,695.58 5,927,204.78 466,785.27 0.43 5,707.86 MWD+IFR-AK-CAZ-SC(6) 7,259.45 72.10 91.67 3,272.99 3,130.81 -466.67 5,787.42 5,927,202.04 466,877.09 0.77 5,799.22 MWD+IFR-AK-CAZ-SC(6) 7,356.10 72.69 92.23 3,302.22 3,160.04 -469.80 5,879.49 5,927,198.43 466,969.13 0.82 5,890.93 MWD+IFR-AK-CAZ-SC(6) 7,446.20 72.70 92.97 3,329.03 3,186.85 -473.70 5,965.42 5,927,194.09 467,055.03 0.78 5,976.64 MWD+IFR-AK-CAZ-SC(6) 7,544.53 72.56 93.04 3,358.38 3,216.20 -478.62 6,059.14 5,927,188.69 467,148.71 0.16 6,070.21 MWD+IFR-AK-CAZ-SC(6) 7,641.08 72.24 92.66 3,387.58 3,245.40 -483.20 6,151.05 5,927,183.64 467,240.60 0.50 6,161.95 MWD+IFR-AK-CAZ-SC(6) 7,735.87 72.29 93.48 3,416.45 3,274.27 -488.03 6,241.21 5,927,178.34 467,330.72 0.83 6,251.97 MWD+IFR-AK-CAZ-SC(6) 7,830.62 72.42 93.65 3,445.17 3,302.99 -493.65 6,331.33 5,927,172.26 467,420.80 0.22 6,342.06 MWD+IFR-AK-CAZ-SC(6) 4/27/2010 9:39:34AM Page 4 COMPASS 2003.16 Build 69 ConocoPhillips (Alaska) Inc. Definitive Survey Report Company: ConocoPhillips(Alaska)Inc. Local Co-ordinate Reference: Well 2L-304 Project Kuparuk River Unit TVD Reference:' 2L-304©142.18ft(D16(114.9+25.45+1.83)) Site: Kuparuk 2L_Pad MD Reference: 2L-304©142.18ft(D16(114.9+25.45+1.83)) Well: 2L-304 North Reference: True Wellbore: 2L-304 Survey Calculation Method: Minimum Curvature Design: 2L-304 Database: CPAI EDM Production Survey Map Map Vertical MD Inc Azi TVD TVDSS +N/-S +El-W Northing Easting DLS Section (ft) (°) (1 (ft) (ft) (ft) (ft) (ft) (ft) (°/100') (ft) Survey Tool Name 7,927.39 72.35 94.07 3,474.46 3,332.28 -499.86 6,423.35 5,927,165.58 467,512.78 0.42 6,434.12 MWD+IFR-AK-CAZ-SC(6) 8,021.15 71.98 93.76 3,503.17 3,360.99 -505.95 6,512.40 5,927,159.03 467,601.78 0.50 6,523.20 MWD+IFR-AK-CAZ-SC(6) 8,116.59 72.18 94.34 3,532.54 3,390.36 -512.37 6,602.98 5,927,152.15 467,692.32 0.62 6,613.85 MWD+IFR-AK-CAZ-SC(6) 8,211.34 72.22 94.29 3,561.50 3,419.32 -519.15 6,692.94 5,927,144.90 467,782.23 0.07 6,703.94 MWD+IFR-AK-CAZ-SC(6) 8,301.55 72.75 94.86 3,588.65 3,446.47 -526.02 6,778.69 5,927,137.59 467,867.94 0.84 6,789.86 MWD+IFR-AK-CAZ-SC(6) 8,398.08 72.81 95.38 3,617.23 3,475.05 -534.24 6,870.52 5,927,128.89 467,959.72 0.52 6,881.99 MWD+IFR-AK-CAZ-SC(6) 8,493.50 72.62 95.48 3,645.58 3,503.40 -542.87 6,961.23 5,927,119.80 468,050.37 0.22 6,973.04 MWD+IFR-AK-CAZ-SC(6) 8,588.04 72.49 95.23 3,673.92 3,531.74 -551.28 7,051.02 5,927,110.92 468,140.12 0.29 7,063.17 MWD+IFR-AK-CAZ-SC(6) 8,678.97 72.30 95.33 3,701.42 3,559.24 -559.26 7,137.33 5,927,102.51 468,226.37 0.23 7,149.79 MWD+IFR-AK-CAZ-SC(6) 8,778.56 72.62 94.55 3,731.44 3,589.26 -567.44 7,231.93 5,927,093.84 468,320.92 0.81 7,244.65 MWD+IFR-AK-CAZ-SC(6) 8,869.74 72.49 94.23 3,758.77 3,616.59 -574.09 7,318.66 5,927,086.74 468,407.61 0.36 7,331.52 MWD+IFR-AK-CAZ-SC(6) 8,964.01 72.63 94.31 3,787.03 3,644.85 -580.79 7,408.35 5,927,079.58 468,497.25 0.17 7,421.32 MWD+IFR-AK-CAZ-SC(6) 9,063.66 72.44 94.22 3,816.93 3,674.75 -587.86 7,503.14 5,927,072.02 468,592.00 0.21 7,516.23 MWD+IFR-AK-CAZ-SC(6) 9,154.85 72.44 94.50 3,844.45 3,702.27 -594.47 7,589.83 5,927,064.97 468,678.64 0.29 7,603.05 MWD+IFR-AK-CAZ-SC(6) 9,247.85 72.63 94.46 3,872.36 3,730.18 -601.40 7,678.27 5,927,057.58 468,767.04 0.21 7,691.64 MWD+IFR-AK-CAZ-SC(6) 9,342.66 72.49 94.49 3,900.77 3,758.59 -608.46 7,768.45 5,927,050.06 468,857.17 0.15 7,781.98 MWD+IFR-AK-CAZ-SC(6) 9,437.96 72.51 94.47 3,929.43 3,787.25 -615.56 7,859.06 5,927,042.50 468,947.73 0.03 7,872.75 MWD+IFR-AK-CAZ-SC(6) 9,532.41 72.38 94.48 3,957.92 3,815.74 -622.58 7,948.84 5,927,035.01 469,037.46 0.14 7,962.68 MWD+IFR-AK-CAZ-SC(6) 9,626.66 72.63 94.84 3,986.25 3,844.07 -629.88 8,038.43 5,927,027.24 469,127.01 0.45 8,052.46 MWD+IFR-AK-CAZ-SC(6) 9,717.42 72.90 94.75 4,013.14 3,870.96 -637.13 8,124.81 5,927,019.55 469,213.34 0.31 8,139.06 MWD+IFR-AK-CAZ-SC(6) 9,815.61 73.13 94.76 4,041.83 3,899.65 -644.91 8,218.40 5,927,011.29 469,306.88 0.23 8,232.86 MWD+IFR-AK-CAZ-SC(6) 9,904.58 73.27 94.59 4,067.54 3,925.36 -651.86 8,303.29 5,927,003.91 469,391.72 0.24 8,317.94 MWD+IFR-AK-CAZ-SC(6) 10,001.95 72.25 94.22 4,096.40 3,954.22 -659.00 8,396.01 5,926,996.29 469,484.39 1.11 8,410.80 MWD+IFR-AK-CAZ-SC(6) 10,100.01 72.29 94.70 4,126.26 3,984.08 -666.26 8,489.12 5,926,988.55 469,577.46 0.47 8,504.08 MWD+IFR-AK-CAZ-SC(6) 10,187.83 72.50 94.53 4,152.82 4,010.64 -673.00 8,572.56 5,926,981.38 469,660.85 0.30 8,587.69 MWD+IFR-AK-CAZ-SC(6) 10,286.31 72.94 94.84 4,182.08 4,039.90 -680.68 8,666.28 5,926,973.22 469,754.52 0.54 8,681.62 MWD+IFR-AK-CAZ-SC(6) 10,379.76 73.15 94.25 4,209.33 4,067.15 -687.76 8,755.39 5,926,965.68 469,843.58 0.64 8,770.89 MWD+IFR-AK-CAZ-SC(6) 10,471.02 72.95 95.27 4,235.94 4,093.76 -695.01 8,842.38 5,926,957.99 469,930.53 1.09 8,858.09 MWD+IFR-AK-CAZ-SC(6) 10,567.37 72.75 94.41 4,264.35 4,122.17 -702.77 8,934.12 5,926,949.75 470,022.22 0.88 8,950.06 MWD+IFR-AK-CAZ-SC(6) 10,658.36 72.56 94.41 4,291.47 4,149.29 -709.45 9,020.71 5,926,942.62 470,108.77 0.21 9,036.79 MWD+IFR-AK-CAZ-SC(6) 10,749.28 72.55 94.05 4,318.73 4,176.55 -715.85 9,107.21 5,926,935.78 470,195.23 0.38 9,123.40 MWD+IFR-AK-CAZ-SC(6) 10,849.24 72.50 93.68 4,348.75 4,206.57 -722.28 9,202.34 5,926,928.86 470,290.31 0.36 9,218.56 MWD+IFR-AK-CAZ-SC(6) 10,944.36 72.19 94.56 4,377.60 4,235.42 -728.79 9,292.75 5,926,921.89 470,380.67 0.94 9,309.05 MWD+IFR-AK-CAZ-SC(6) 11,039.37 72.70 94.74 4,406.25 4,264.07 -736.13 9,383.03 5,926,914.08 470,470.91 0.57 9,399.53 MWD+IFR-AK-CAZ-SC(6) 11,130.99 72.94 93.87 4,433.32 4,291.14 -742.70 9,470.32 5,926,907.06 470,558.15 0.94 9,486.93 MWD+IFR-AK-CAZ-SC(6) 11,228.38 73.33 93.98 4,461.57 4,319.39 -749.08 9,563.30 5,926,900.20 470,651.09 0.41 9,579.96 MWD+IFR-AK-CAZ-SC(6) 11,322.99 73.07 93.64 4,488.92 4,346.74 -755.10 9,653.67 5,926,893.72 470,741.42 0.44 9,670.35 MWD+IFR-AK-CAZ-SC(6) 11,417.74 72.94 93.85 4,516.61 4,374.43 -761.02 9,744.09 5,926,887.34 470,831.80 0.25 9,760.78 MWD+IFR-AK-CAZ-SC(6) 11,512.57 72.82 94.62 4,544.53 4,402.35 -767.71 9,834.47 5,926,880.18 470,922.14 0.79 9,851.26 MWD+IFR-AK-CAZ-SC(6) 11,608.71 72.95 92.28 4,572.82 4,430.64 -773.24 9,926.18 5,926,874.18 471,013.81 2.33 9,942.92 MWD+IFR-AK-CAZ-SC(6) 4/27/2010 9:39:34AM Page 5 COMPASS 2003.16 Build 69 ConocoPhillips (Alaska) Inc. Definitive Survey Report Company: ConocoPhillips(Alaska)Inc. Local Co-ordinate Reference: Well 2L-304 Project: Kuparuk River Unit TVD Reference:, 2L-304 @ 142.18ft(D16(114.9+25.45+1.83)) Site: Kuparuk 2L_Pad MD Reference: 2L-304 @ 142.18ft(D16(114.9+25.45+1.83)) Well: 2L-304 North Reference: True Wellbore: 2L-304 Survey Calculation Method: Minimum Curvature Design: 2L-304 Database: CPAI EDM Production Survey Map Map Vertical MD Inc Azi TVD TVDSS +N/-S +e-W Northing Easting DLS Section (ft) (1 (°) (ft) (ft) (ft) (ft) (ft) (ft) (1100') (ft) Survey Tool Name 11,701.45 72.83 94.17 4,600.11 4,457.93 -778.22 10,014.67 5,926,868.74 471,102.26 1.95 10,031.31 MWD+IFR-AK-CAZ-SC(6) I 11,793.75 72.82 94.18 4,627.37 4,485.19 -784.64 10,102.62 5,926,861.86 471,190.17 0.01 10,119.35 MWD+IFR-AK-CAZ-SC(6) I 11,891.21 72.94 94.88 4,656.06 4,513.88 -792.00 10,195.47 5,926,854.03 471,282.97 0.70 10,212.38 MWD+IFR-AK-CAZ-SC(6) 11,986.39 72.75 94.94 4,684.13 4,541.95 -799.79 10,286.08 5,926,845.78 471,373.53 0.21 10,303.23 MWD+IFR-AK-CAZ-SC(6) • 12,079.90 72.25 96.44 4,712.25 4,570.07 -808.63 10,374.82 5,926,836.48 471,462.22 1.62 10,392.37 MWD+IFR-AK-CAZ-SC(6) 12,173.01 72.36 95.42 4,740.55 4,598.37 -817.79 10,463.05 5,926,826.87 471,550.39 1.05 10,481.05 MWD+IFR-AK-CAZ-SC(6) ; 12,269.69 72.49 94.76 4,769.74 4,627.56 -825.97 10,554.85 5,926,818.22 471,642.14 0.66 10,573.14 MWD+IFR-AK-CAZ-SC(6) 12,363.67 72.62 95.75 4,797.92 4,655.74 -834.18 10,644.13 5,926,809.55 471,731.37 1.01 10,662.73 MWD+IFR-AK-CAZ-SC(6) 12,455.51 72.56 95.44 4,825.40 4,683.22 -842.72 10,731.35 5,926,800.55 471,818.53 0.33 10,750.32 MWD+IFR-AK-CAZ-SC(6) 12,549.38 72.77 95.60 4,853.37 4,711.19 -851.34 10,820.54 5,926,791.48 471,907.66 0.28 10,839.87 MWD+IFR-AK-CAZ-SC(6) 12,645.56 73.14 93.78 4,881.56 4,739.38 -858.86 10,912.18 5,926,783.49 471,999.26 1.85 10,931.72 MWD+IFR-AK-CAZ-SC(6) 12,741.14 72.88 93.55 4,909.49 4,767.31 -864.70 11,003.40 5,926,777.18 472,090.44 0.36 11,022.93 MWD+IFR-AK-CAZ-SC(6) 12,835.01 71.76 94.35 4,938.00 4,795.82 -870.86 11,092.62 5,926,770.56 472,179.62 1.44 11,112.20 MWD+IFR-AK-CAZ-SC(6) 12,888.26 70.48 95.93 4,955.23 4,813.05 -875.37 11,142.80 5,926,765.79 472,229.77 3.70 11,162.54 MWD+IFR-AK-CAZ-SC(6) 12,931.56 69.81 96.47 4,969.94 4,827.76 -879.77 11,183.29 5,926,761.18 472,270.23 1.94 11,203.26 MWD+IFR-AK-CAZ-SC(6) 12,982.83 69.04 98.49 4,987.96 4,845.78 -886.02 11,230.88 5,926,754.69 472,317.78 3.98 11,251.26 MWD+IFR-AK-CAZ-SC(6) 13,024.81 68.10 99.97 5,003.30 4,861.12 -892.28 11,269.45 5,926,748.23 472,356.31 3.97 11,290.31 MWD+IFR-AK-CAZ-SC(6) 13,071.90 66.70 101.71 5,021.39 4,879.21 -900.45 11,312.14 5,926,739.84 472,398.96 4.52 11,333.71 MWD+IFR-AK-CAZ-SC(6) 13,119.80 65.62 104.01 5,040.76 4,898.58 -910.20 11,354.86 5,926,729.87 472,441.62 4.94 11,377.32 MWD+IFR-AK-CAZ-SC(6) I 13,164.82 64.80 106.60 5,059.63 4,917.45 -920.98 11,394.27 5,926,718.88 472,480.98 5.53 11,417.80 MWD+IFR-AK-CAZ-SC(6) 13,214.09 64.09 109.32 5,080.89 4,938.71 -934.69 11,436.55 5,926,704.97 472,523.18 5.18 11,461.49 MWD+IFR-AK-CAZ-SC(6) 13,260.60 63.51 111.09 5,101.43 4,959.25 -949.10 11,475.71 5,926,690.36 472,562.26 3.64 11,502.19 MWD+IFR-AK-CAZ-SC(6) 13,309.37 62.70 114.78 5,123.49 4,981.31 -966.04 11,515.76 5,926,673.21 472,602.22 6.95 11,544.09 MWD+IFR-AK-CAZ-SC(6) 13,354.99 62.45 116.59 5,144.51 5,002.33 -983.59 11,552.25 5,926,655.48 472,638.61 3.56 11,582.54 MWD+IFR-AK-CAZ-SC(6) 13,403.18 61.80 119.31 5,167.04 5,024.86 -1,003.55 11,589.88 5,926,635.32 472,676.13 5.17 11,622.43 MWD+IFR-AK-CAZ-SC(6) 13,454.25 60.92 121.78 5,191.52 5,049.34 -1,026.32 11,628.48 5,926,612.35 472,714.61 4.58 11,663.64 MWD+IFR-AK-CAZ-SC(6) 13,497.91 60.10 123.85 5,213.02 5,070.84 -1,046.91 11,660.42 5,926,591.60 472,746.44 4.53 11,697.97 MWD+IFR-AK-CAZ-SC(6) 13,543.39 59.78 126.14 5,235.80 5,093.62 -1,069.48 11,692.66 5,926,568.87 472,778.56 4.41 11,732.86 MWD+IFR-AK-CAZ-SC(6) 13,593.66 59.28 129.10 5,261.30 5,119.12 -1,095.92 11,726.97 5,926,542.25 472,812.74 5.17 11,770.30 MWD+IFR-AK-CAZ-SC(6) 13,641.69 58.76 132.03 5,286.02 5,143.84 -1,122.70 11,758.25 5,926,515.32 472,843.87 5.34 11,804.78 MWD+IFR-AK-CAZ-SC(6) 13,685.82 57.93 134.09 5,309.18 5,167.00 -1,148.34 11,785.70 5,926,489.54 472,871.18 4.40 11,835.31 MWD+IFR-AK-CAZ-SC(6) 13,735.21 56.94 136.66 5,335.77 5,193.59 -1,177.96 11,814.94 5,926,459.77 472,900.27 4.82 11,868.12 MWD+IFR-AK-CAZ-SC(6) 13,785.82 56.42 139.26 5,363.58 5,221.40 -1,209.36 11,843.25 5,926,428.23 472,928.42 4.41 11,900.26 MWD+IFR-AK-CAZ-SC(6) 13,834.03 56.23 141.91 5,390.31 5,248.13 -1,240.35 11,868.73 5,926,397.11 472,953.73 4.59 11,929.52 MWD+IFR-AK-CAZ-SC(6) 13,881.73 56.14 144.62 5,416.86 5,274.68 -1,272.10 11,892.43 5,926,365.24 472,977.26 4.72 11,957.12 MWD+IFR-AK-CAZ-SC(6) 13,928.66 56.11 146.86 5,443.02 5,300.84 -1,304.30 11,914.36 5,926,332.93 472,999.03 3.96 11,983.03 MWD+IFR-AK-CAZ-SC(6) 13,975.86 55.56 146.94 5,469.53 5,327.35 -1,337,02 11,935.69 5,926,300.11 473,020.18 1.17 12,008.40 MWD+IFR-AK-CAZ-SC(6) ! 14,055.99 53.92 147.98 5,515.78 5,373.60 -1,392.17 11,970.88 5,926,244.78 473,055.09 2.30 12,050.43 MWD+IFR-AK-CAZ-SC(7) 14,157.27 53.07 148.22 5,576.03 5,433.85 -1,461.28 12,013.90 5,926,175.45 473,097.75 0.86 12,102.01 MWD+IFR-AK-CAZ-SC(7) 14,252.10 52.71 148.03 5,633.25 5,491.07 -1,525.51 12,053.84 5,926,111.03 473,137.35 0.41 12,149.91 MWD+IFR-AK-CAZ-SC(7) 4/27/2010 9:39:34AM Page 6 COMPASS 2003.16 Build 69 ConocoPhillips (Alaska) Inc. Definitive Survey Report Company: ConocoPhillips(Alaska)Inc. Local Co-ordinate Reference: Well 2L-304 Project Kuparuk River Unit TVD Reference: 2L-304 @ 142.18ft(D16(114.9+25.45+1.83)) Site: Kuparuk 2L_Pad MD Reference: ` 2L-304©142.18ft(D16(114.9+25.45+1.83)) Well: 2L-304 North Reference: True Wellbore: 2L-304 Survey Calculation Method: Minimum Curvature Design: 2L-304 Database: CPAI EDM Production Survey Map Map Vertical MD Inc Azi TVD TVDSS +N/-S +E/-W Northing Easting DLS Section (ft) (°) (°) (ft) (ft) (ft) (ft) (ft) (ft) (°/100') (ft) Survey Tool Name 14,295.27 52.23 148.14 5,659.55 5,517.37 -1,554.57 12,071.94 5,926,081.88 473,155.30 1.13 12,171.61 MWD+IFR-AK-CAZ-SC(7) 14,340.00 52.23 148.14 5,686.94 5,544.76 -1,584.60 12,090.60 5,926,051.76 473,173.81 0.00 12,193.99 PROJECTED to TD 4/27/2010 9:39:34AM Page 7 COMPASS 2003.16 Build 69 C r,, KUP 2L-304 Conoco Phil ips ° Well Attributes Max Angle&MD TD Aics,, inn. " Wallbore API/U WI [Field N Well Status I el(°) IMD(ftKB) Act Blot(RIKB) ' t4xncc>F++kQ+ ? 501032061300 TARN PARTICIPATING AREA PROD 77.81 11 4,85026 14,340.0 I Comment H25(ppm) [Dale Annotation End Date [KBGrd(ft) Rig Release Date •Well Canfg_HORIZONTAL-21,300,5/2512/11 0 9:2605 AM SSSV:NIPPLE _- Last WO: 4/21/2010 _� - -- _ Schematic Actual Annotation [Depth(ftKB) End Date [Annotation Last Mod.-[End Date Last Tag:SLM 14,178.0 5/21/2010 Rev Reason:FRAC Imosbor 5/25/2010 Casing Strings Casing Description String 0... 'String ID...Top(ftKB) Set Depth(f...Set Depth(TVD)...String Wt...String...String Top That CONDUCTOR 16 15.062 26.0 108.0 108.0 ! 62.50 1-140 Casing Description String O String ID Top(MB) Sat Depth(f...Set Depth(ND)...IString Wt...String String Tap Thrd HANGER,26 - SURFACE 10 3/4 9.950 28.9 _ 4,297.0 2,398.9 l 45.50 L-80 BTC-Mod ■uu,„ Casing Description String 0... String ID...Top(ftKB) Set Depth(i..Set Depth(TVD)...'String Wt...String...String Top Thrd I INTERMEDIATE 7 5/8 6.875 26.1 14,330.5 5,681.1 29.70 L-80 BTCM C II Tubing Stnn s Tubing Description [Stria 0... [String ID...lTOp(ftKB) [Set Depth/...[Set Depth ,String...[String Top Thrd n9 9 9 ( p (TVD)._'String Wt... TUBING 3 1/2 2.992 26.3 13,800.2 5,371.5 9-30 [ L-80 EUE 8RD a Completion Details Top Depth (TVD) Top Intl Nomi... CONDUCTOR. _ Top(M)(ftKB) r) Item Description ___.. Comment ID(in) 26-106 -...... 26.3 26.3 0.00 HANGER FMC TUBING HANGER 2.992 480.1 479.2 6.00 NIPPLE Cannon DS 2.875"Profile nipple 2.875 Is - ---_ 13,681.0 5,306.6 58.02 SLEEVE-C BAKER CMU SLIDING SLEEVE(CLOSED 5/23/2010) 2.812 NIPPLE,480 i 13,732.8 5,334.5 56.96 PBR BAKER PBR 80-40 3.000 1 13,747.1 5,342.2 56.57 PACKER BAKER FHL PACKER 2.920 II13,791.5 5,366.7 56.31 NIPPLE CAMCO'D'NIPPLE 2.750 13,800.0 5,371.4 56.29 WLEG CAMCO WIRELINE ENTRY GUIDE 2.990 II h Perforations&Slots _Shot I I Top(TVD) Blot(7VD) Dena Top MKS)Bbn(MKS) MS) PCB) Zone oat. (•h- Type comment 14,000 14,020 5,4832, 5,494.7 5/23/2010 6.0 IPERF 2-5'Prospector gun,60 degree phase AI Stimulations&Treatments Bottom Min Top Max Bbn Top Depth Depth SURFACE,_ Depth Depth (TVD) (TYD)29-4,297 (ftKB) (ftKB) (ftKB) (ftKB) -.._Type Date Comment 14,000.0 14,020.0 5,483.2 5,494.7 Hydraulic 5/24/2010 PUMPED 167,010#OF 16/20 CAROLITE INTO GAS LIFT, Fracture FORMATION PERFS 4.301 .: __... -__�.. -_-_ ___ . s, Notes:General&Safety End Date Annotation III 4/24/20(0 NO I E'VIEW SCI IEMATIC W/AIaSKa SCtlematic9.0 $'' CHEMICAL. Lift ' 7,181 • ar I I; GAS LIFT._ .... 8 ft ,310 GAS LIFT. 12.140 f GAS 1 T,-__3,52LIF9 ill I SLEEVE-C,,681 13,681 It PBR,13,733---- PACKER, 13,747 f y.- _ NIPPLE,13,]91- 1.1 Mandrel Details Top Depth Top Port (TVD) Incl OD Valve Latch Six. TRO Run Stn Top(9K13)_..(ftKB) (% Make Model (In) Sery Type Type (in) (p.1) Run Date Cam... WLEG,13,800 -- 1 4,301.4 2,400.2 72.67 CAMCO KBMG 1 GAS LIFT DMY BK-5 0.000 0.0 4/20/2010 IPERF, 2 7,181.3 3,248.4 71.62 CAMCO KBMG-LTS 1 CHEM DMY BK-5 0.000 0.0 4/20/2010 14,000-14,020 Hydraulic 1 I 3 8,309.6 3,591.3 72.99 CAMCO KBMG 1 GAS LIFT DMY BK-5 0.000 0.0 4/20/2010 Fracture, -_ _ i 14,000 4 12,139.7 4,730-4 72.32 CAMCO KBMG 1 GAS LIFT DMY BK-5 0.000 0.0 4/20/2010 5 13,528.6 5,228.4 59.93 CAMCO KBMG 1 GAS LIFT DMY BK 0.000 0.0 5/21/2010 II NTERMEDIATE, 26-14,331 TD,14,340 WELL LOG TRANSMITTAL To: Alaska Oil and Gas Conservation Comm. May 27, 2010 Attn.: Christine Mahnken 333 West 7th Avenue, Suite 100 Anchorage, Alaska 99501 RE: Perforating Record: 2L-304 Run Date: 5/22/2010 The technical data listed below is being submitted herewith. Please address any problems or concerns to the attention of: Rafael Barreto, Halliburton Wireline &Perforating, 6900 Arctic Blvd., Anchorage, AK 99518 2L-304 Digital Data in LAS format, Digital Log Image file 1 CD Rom 50-103-20613-00 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING A COPY OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: Halliburton Wireline &Perforating Attn: Rafael Barreto 6900 Arctic Blvd. Anchorage, Alaska 99518 Office: 907-273-3527 Fax: 907-273-, 3 07/ d 1 ( I 9 P9'cc rafael.barreto . � -oort 3===:-e l Date: Signed: - ? ass G . i .;?,7_,, . ri Conoco Phillips TRANSMITTAL FROM: Sandra D. Lemke, AT01808 Christine Mahnken ConocoPhillips Alaska AOGCC P.O. Box 100360 333 W. 7th Ave., Suite 100 Anchorage AK 99510-0360 Anchorage,Alaska 99501 RE: KRU 2L-304 DATE: 05/11/2010 mail Tr.n mitt-I: Kuparuk River Unit, Alaska 2L-304 Hardcopy report and CD digital data Final Well Report Mud logging data; 2L-304; CANRIG; 4/26/2010; TOC, Equipment and crew, well data, geological data, pressure/formations strength data, drilling data, daily reports, formation logs; Formation logs MD and TVD 226-14340' and LWD Combo Log MD and TVD 226-14340' and Gas Ratio Log MD and TVD 226-14340' and Drilling Dynamics MD and TVD 226-14340' and CD contains final well report, morning reports, LAS data, PDF files, DML data, remarks file and TIFF files. Please sign, scan and return transmittal via e-mail promptly CC: 2L-304 transmittal file RECEVEI Receipt: ,Q Date: MAY 1i2010 Alaska al 84 c C.,',COMM. 1T55-Upstream Applications&Data rAhillips t Anchorage, Alaska I Ph: 907.265.6947 Sandra.D.Lemke0Conocophillips.com c010 .-01 i 19Co6IS SEAN PARNELL,GOVERNOR ALASKA OIL AND GAS 333 W.7th AVENUE,SUITE 100 CONSERVATION COMMISSION 333 ALASKA 99501-3539 PHONE (907)279-1433 FAX (907)276-7542 Mr. G.L. Alvord CPAI Drilling Manager ConocoPhillips Alaska Inc. P.O. Box 100360 Anchorage, Alaska 99510-0360 Re: Kuparuk River Field, Tarn Oil Pool, 2L-304 ConocoPhillips Alaska Inc. Permit No: 210-011 Surface Location: 147' FNL, 559' FEL, SEC. 22, T1ON, R7E, UM Bottomhole Location: 1725' FNL, 918' FWL, SEC. 19, T1ON, R8E, UM Dear Mr. Alvord: Enclosed is the approved application for permit to drill the above referenced development well. This permit to drill does not exempt you from obtaining additional permits or an approval required by law from other governmental agencies and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the Commission reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the Commission specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or a Commission order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. When providing notice for a representative of the Commission to witness any required test, contact the Commission's petroleum field inspector at (907) 659-3607 (pager). Sincerely, Daniel T. Seamount, Jr. Chair DATED thisZ2 day of January, 2010 cc: Department of Fish & Game, Habitat Section w/o encl. (via e-mail) Department of Environmental Conservation w/o encl. (via e-mail) RECEIVED STATE OF ALASKA JAN 2 1 2010 ALASKA OIL AND GAS CONSERVATION COMMISSION PERMIT TO DRILL Alaska Oil&Gas Cens.Commission 20 AAC 25.005 Ancherage la.Type of Work: lb.Proposed Well Class: Development-Oil Is -Service-Winj ❑ Single Zone ❑ ic.Specify if well is proposed for: Drill •- Re-drill❑ Stratigraphic Test ❑ Development-Gas ❑ Service-Supply ❑ Multiple Zone❑ Coalbed Gas ❑ Gas Hydrates❑ Re-entry ❑ Exploratory ❑ Service-WAG ❑ Service-Disp ❑ Shale Gas ❑ 2.Operator Name: 5. Bond: U Blanket U Single Well 11.Well Name and Number: ConocoPhillips Alaska,Inc. Bond No. 59-52-180 • 2L-304 ' 3.Address: 6.Proposed Depth: 12.Field/Pool(s): P.O.Box 100360 Anchorage,AK 99510-0360 MD: 14281' • ND: 5656' • Kuparuk River Field ' 4a. Location of Well(Governmental Section): 7.Property Designation(Lease Number): Surface: 147'FNL,559'FEL,Sec.22,T1ON,R7E, UM ' ADL 380052,380051,025603 Tarn Oil Pool Top of Productive Horizon: 8.Land Use Permit: 13.Approximate Spud Date: 1455'FNL,727'FWL,Sec. 19,T1ON,R8E,UM 4600,4599,2677 3/1/2010 • Total Depth: 9.Acres in Property: 14.Distance to 1725'FNL,918'FWL,Sec. 19,T1ON,R8E,UM 2560 Nearest Property: 5427' 4b.Location of Well(State Base Plane Coordinates-NAD 27): 10.KB Elevation above MSL: • 142.6 feet 15.Distance to Nearest Well Open Surface:x- 461093 • y- 5927698 . Zone- 4 GL Elevation above MSL: • 117.1 feet to Same Pool: 2L-301 ,5416'ND 16.Deviated wells: Kickoff depth: 325 • ft. 17.Maximum Anticipated Pressures in psig(see 20 AAC 25 035) Maximum Hole Angle: 73° deg Downhole:2340 psig • Surface: 1740 psig • 18.Casing Program: Specifications Top - Setting Depth -Bottom Cement Quantity,c.f.or sacks Hole Casing Weight Grade Coupling Length MD ND MD ND (including stage data) 24" 16" 62.5# H-40 Welded 110' Surf. Surf. 110' - 110' • Driven 13-1/2" 10-3/4" 45.5# L-80 BTC 4300' Surf. Surf. 4300' 2407' • 720 sx AS Lite,370 sx Class G 9-7/8" 7-5/8" 29.7# L-80 BTCM 14281' Surf. Surf. 14281' 5656' • 515 sx GasBLOK Class G - 19 PRESENT WELL CONDITION SUMMARY (To be completed for Redrill and Re-Entry Operations) Total Depth MD(ft): Total Depth ND(ft): Plugs(measured) Effective Depth MD(ft): Effective Depth ND(ft): Junk(measured) Casing Length Size Cement Volume MD ND Conductor/Structural _ Surface Intermediate Production Liner Perforation Depth MD(ft): Perforation Depth ND(ft): 20.Attachments: Property Plat❑ BOP Sketch❑ Drilling Program El Time v.Depth Plot ❑ Shallow Hazard Analysis ❑ Diverter Sketch❑ Seabed Report ❑ Drilling Fluid Program Q 20 AAC 25.050 requirements 0 21.Verbal Approval: Commission Representative: Date: 114116-- -/ 22. I hereby certify that the foregoing is true and correct. Contact Mike Greener @ 263-4820 Printed Name G. L. Alvord Title Alaska Drilling Manager Signature A-/- a(_ Phone ?�S-(01 to Date ((2 (Z o f e LL Commission Use Only Permit to Drill / API Number: Permit Approv I See cover letter Number. 2-1 06/ / (9' 50-/03'1C'C,I -CO-`6 Date: `Approv Al for other requirements Conditions of approval: If box is checked,well may not be used to explore for,test,or produce coalbed me ane,gas hydrates,or gas contained in shales: 2/ i 35cc, 14 ,BOI° Tsr Samples req'd: Yes ❑ No Mud log req'd: Yes ❑ No [✓7 Other: H2S measures: Yes [�No ❑ Directional svy req'd: Yes si No ❑ * �5'DO Psi 14�nar (f APPROVED BY THE COMMISSION 772V/ DATE: ,COMMISSIONER Form 10 401 /2009) T 's permit is valid o 2 o d of approval(20 AAC 25 ,q/ Submit in Duplicate • • Post Office Box 100360CPI1IIhhS Anchorage,Alaska 99510-0360 Chip Alvord RECEIVED Phone(907)265-6120 Email: Chip.Alvord @conocophillips.com January 19th,2010 JAN 2 1 2010 Alaska Oil and Gas Conservation Commission Alaska®g&Gas Cons.Commission 333 West 7th Avenue,Suite 100 Anchorage Anchorage,Alaska 99501 RE: Application for Permit to Drill 2L-304 Dear Commissioners, ConocoPhillips Alaska,Inc hereby applies for a Permit to Drill for the onshore production well 2L-304. The well will be drilled and completed using Doyon Rig#16. The well will then be put on production. The planned spud date for 2L-304 is Mar. 1st,2010. Please find attached for the review of the Commission forms 10-401 and the information required by 20 ACC 25.005 for this well bore. If you have any questions or require further information,please contact Mike Greener at 907-263-4820. Sincerely, Chip Alvord Drilling Manager A ition for Permit to Drill,Well 2L-304 Saved: 19-Jan-10 Permit It — Tarn Well 2L-304 ` r.1 a� Application for Permit to Drill Document ATE • 7e Maxirniz * Well Vele! Table of Contents 1. Well Name 2 Requirements of 20 AAC 25.005 0 2 2. Location Summary 2 Requirements of 20 AAC 25.005(c)(2) 2 Requirements of 20 AAC 25.050(b) 2 3. Blowout Prevention Equipment Information 3 Requirements of 20 AAC 25.005(c)(3) 3 4. Drilling Hazards Information 3 Requirements of 20 AAC 25.005(c)(4) 3 5. Procedure for Conducting Formation Integrity Tests 3 Requirements of 20 AAC 25.005(c)(5) 3 6. Casing and Cementing Program 4 Requirements of 20 AAC 25.005(c)(6) 4 7. Diverter System Information 4 Requirements of 20 AAC 25.005(c)(7) 4 8. Drilling Fluid Program 4 Requirements of 20 AAC 25.005(c)(8) 4 9. Abnormally Pressured Formation Information 5 Requirements of 20 AAC 25.005(c)(9) 5 10. Seismic Analysis 5 Requirements of 20 AAC 25.005(c)(10) 5 11. Seabed Condition Analysis 5 Requirements of 20 AAC 25.005(c)(11) 5 12. Evidence of Bonding 5 Requirements of 20 AAC 25.005(c)(12) 5 13. Proposed Drilling Program 5 Requirements of 20 AAC 25.005(c)(13) 5 2L-304 APD Page 1 of 7 ORIGMAL Printed:19-Jan-10 J I ition for Permit to Drill,Well 2L-304 Saved: 19-Jan-10 14. Discussion of Mud and Cuttings Disposal and Annular Disposal 6 Requirements of 20 AAC 25.005(c)(14) 6 15. Attachments 6 Attachment 1 Directional Plan 6 Attachment 2 Drilling Hazards Summary 6 Attachment 3 Well Schematic 6 Attachment 4 Cement Summary 6 1. Well Name Requirements of 20 AAC 25.005(fl Each well must be identified by a unique name designated by the operator and a unique API number assigned by the commission under 20 AAC 25.040(b).For a well with multiple well branches,each branch must similarly be identified by a unique name and API number by adding a suffix to the name designated for the well by the operator and to the number assigned to the well by the commission. The well for which this application is submitted will be designated as 2L-304. 2. Location Summary Requirements of 20 AAC 25.005(c)(2) An application for a Permit to Drill must be accompanied by each of the following items.except for an item already on file with the commission and identified in the application: (2)a plat identh'ing the property and the property's owners and showing (A)the coordinates of the proposed location of the well at the surface,at the top of each objective formation,and at total depth,referenced to governmental section lines. (B)the coordinates of the proposed location of the well at the surface,referenced to the state plane coordinate system for this state as maintained by the National Geodetic Survey in the National Oceanic and Atmospheric Administration; (C)the proposed depth of the well at the top of each objective formation and at total depth; Location at Surface 147' FNL, 559' FEL, Sec 22, T10N,R7E,UM • NAD 1927 RKB Elevation 142.6'AMSL • Northings: 5,927,698 Eastings: 461,093 ' Pad Elevation 117.1'AMSL Location at Top of Productive Interval 1455'FNL,727' FWL,Sec 19,T10N,R8E,UM (Bermuda) Nad 1927 Measured Depth, RKB: 13,864' Northings: 5,926,339 Eastings:472,931 Total Vertical Depth, RKB: 5,403' Total Vertical Depth, SS: 5,260' Location at Total Depth 1,725' FNL, 918' FWL, Sec 19,T10N,R8E,UM • Nad 1927 Measured Depth, RKB: 14,281' Northings: 5,926,068 Eastings: 473,122 Total Vertical Depth, RKB: 5,656' • Total Vertical Depth, SS: 5,513' and (D)other information required by 20 AAC 25.050(b); Requirements of 20 AAC 25.050(b) If a well is to be intentionally deviated,the application for a Permit to Drill(Form 10-401)must (1)include a plat.drawn to a suitable scale,showing the path of the proposed wellbore,including all adjacent wellbores within 200 feet of any portion of the proposed well; Please see Attachment 1: Directional Plan and (2)for all wells within 200 feet of the proposed wellbore (4)list the names of the operators of those wells,to the extent that those names are known or discoverable in public records,and show that each named operator has been furnished a copy of the application by certified mail;or (B)state that the applicant is the only affected owner. 2L-304 APD Page 2 of 7 Printed: 19-Jan-10 JR113 ! NAL A,, Lion for Permit to Drill,Well 2L-304 Saved: 19-Jan-10 The Applicant is the only affected owner. 3. Blowout Prevention Equipment Information Requirements of 20 AAC 25.005(c)(3) An application for a Permit to Drill must be accompanied by each of the following items,except for an item already on file with the commission and identified in the application: (3)a diagram and description of the blowout prevention equipment(BOPE)as required by 20 AAC 25.035,20 AAC 25.036,or 20 AAC 25.037, as applicable; Please reference BOP schematics on file for Doyon 16. 4. Drilling Hazards Information Requirements of 20 AAC 25.005(c)(4) An application for a Permit to Drill must be accompanied by each of the following items,except for an item already on file with the commission and identified in the application: (4)information on drilling hazards,including (A)the maximum downhole pressure that may be encountered criteria used to determine it,and maximum potential surface pressure based on a methane gradient; The closest offset well data for the Bermuda sand shows a max BHP of 2,340 psi at the top of the Bermuda sand at 5,416'TVD in the 2L-301. Equivalent Mud Weight @ TD=2,340/(5,416*.052)=8.31 ppg=0.432 psi/ir The maximum potential surface pressure(MPSP)while drilling 2L-304 is calculated using the predicted 2,340 psi reservoir pressure,a 0.11 psi/ft gas gradient,and a Bermuda sand top TVD of 5,403' (estimated top of T-3 in 2L- 304). MPSP =(5,403 ft TVD)*(0.432-0.11 psi/ft) = 1,740 psi (B)data on potential gas zones: The well bore is not expected to penetrate any gas zones. • and (C)data concerning potential causes of hole problems such as abnormally geo-pressured strata,lost circulation zones,and zones that have a propensity for differential sticking: Please see Attachment 2-Drilling Hazards Summary 5. Procedure for Conducting Formation Integrity Tests Requirements of 20 AAC 25.005(c)(5) An application for a Permit to Drill must be accompanied by each of the following items,except for an item already on file with the commission and identified in the application: (5)a description of the procedure for conducting formation integrity tests,as required under 20 AAC 25.0300; Drill out surface casing shoe and perform LOT test or FIT in accordance with the Kuparuk LOT/FIT procedure that ConocoPhillips Alaska has on file with the Commission. 2L-304 APD Page 3 of 7 Printed: 19-Jan-10 ORIGINAL A ition for Permit to Drill,Well 2L-304 Saved: 19-Jan-10 6. Casing and Cementing Program Requirements of 20 AAC 25.005(c)(6) An application for a Permit to Drill must be accompanied by each of the following items,except for an item already on file with the commission and identified in the application: (6)a complete proposed casing and cementing program as required by 20 AAC 25.030,and a description of any slotted liner,pre perforated liner,or screen to be installed: Casing and Cementing Program Hole Top Btm Csg/Tbg Size Weight Length MD/TVD MD/TVD OD(in) (in) (lbfft) Grade Conn. (ft) (ft) (ft) Cement Program Driven 16 24 62.5 H-40 Welded 110' Surf 110'/110' • Cemented to Surface with 10-3/4 13-1/2 45.5 L-80 BTC 4,300' Surf 4,300'/2,407' 720 sx ASLite Lead 10.7 ppg, 370 sx DeepCRETE Tail Slurry 12.0 ppg Cement Top planned @ 12,500'MD/ , 7-5/8 9-7/8 29.7 L-80 BTCM 14,281' Surf 14,281'/5,656' 4,837'TVD. Cemented w/ 515 sx GasBLOK Class"G"15.8 ppg 7. Diverter System Information Requirements of 20 AAC 25.005(c)(7) An application for a Permit to Drill must be accompanied by each of the following items,except for an item already on file with the commission and identified in the application: (7)a diagram and description of the diverter system as required by 20 AAC 25.035,unless this requirement is waived by the commission under 20 AAC 25.035(h)(2); Please reference diverter schematic on file for Doyon 16. 8. Drilling Fluid Program Requirements of 20 AAC 25.005(c)(8) An application for a Permit to Drill must be accompanied by each of the following items,except for an item already on file with the commission and identified in the application: (8)a drilling fluid program,including a diagram and description of the drilling fluid system,as required by 20 AAC 25.033: Drilling will be done using mud systems having the following properties: Surface 110'—4,300 ' Density(ppg) 8.8—9.6 Funnel Viscosity(seconds) 75—250 Yield Point(cP) 60—80 pH 9.0—9.5 API Filtrate(cc) NC—8.0 Chlorides(mg/I) <1000 Intermediate/Production 4,300'—14,281' Density(ppg) 9.1 —9.7 Yield Point(cP) _ 20—28 Plastic Viscosity(Ib/100 sJ) 16—20 pH 9.5—10.5 API filtrate 4-6 Solids (%) 6—7 Diagram of Doyon 16 Mud System on file. Drilling fluid practices will be in accordance with appropriate regulations stated in 20 AAC 25.033. 2L-304 APD Page 4 of 7 Printed: 19-Jan-10 ORIGINAL tion for Permit to Drill,Well 2L-304 Saved: 19-Jan-10 9. Abnormally Pressured Formation Information Requirements of 20 AAC 25.005(c)(9) An application for a Permit to Drill must be accompanied by each of the following items,except for an item already on file with the commission and identified in the application: (9)for an exploratory or stratigraphic test well,a tabulation setting out the depths of predicted abnormally geo-pressured strata as required by 20 AAC 25.033(fl: N/A-Application is not for an exploratory or stratigraphic test well. 10. Seismic Analysis Requirements of 20 AAC 25.005(c)(10) An application for a Permit to Drill must be accompanied by each of the following items,except for an item already on file with the commission and identified in the application: (10)for an exploratory or stratigraphic test well.a seismic refraction or reflection analysis as required by 20 AAC 25.061(a); N/A-Application is not for an exploratory or stratigraphic test well. 11. Seabed Condition Analysis Requirements of 20 AAC 25.005(c)(11) An application for a Permit to Drill must be accompanied by each of the following items,except for an item already on file with the commission and identified in the application: (11)for a well drilled from an offshore platform,mobile bottom founded structure,jack-up rig.or floating drilling vessel,an analysis of seabed conditions as required by 20 AAC 25.061(b); N/A-Application is not for an offshore well. 12. Evidence of Bonding Requirements of 20 AAC 25.005(c)(12) An application for a Permit to Drill must be accompanied by each of the following items,except for an item already on file with the commission and identified in the application: (12)evidence showing that the requirements of 20 AAC 25.025{Bonding}have been met: Evidence of bonding for ConocoPhillips Alaska,Inc. is on file with the Commission. 13. Proposed Drilling Program Requirements of 20 AAC 25.005(c)(13) An application for a Permit to Drill must be accompanied by each of the following items,except for an item already on file with the commission and identified in the application: The proposed drilling program is listed below. Please refer to Attachment 3:Well Schematic. 1. MIRU Doyon 16 on 2L-304 Conductor. 2. NU and function test diverter system and prepare spud mud. 3. Place warning signs on location indicating the rig has diverter equipment rigged up. 4. Spud and directionally drill 13-1/2"hole to the 10-3/4"surface casing point(4,300'MD/2,407'TVD RKB) according to the directional plan. Run MWD/LWD logging tools in drill string as required for directional monitoring and formation data gathering. 5. Run and cement 10-3/4"45.5#L-80 BTC casing to surface. Adequate excess cement will be pumped to ensure cement reaches the surface during the cement job. Displace cement with mud. Perform top job if required to bring cement to surface. 6. Nipple down diverter and install wellhead and test to 5000 psi. Nipple up BOPE and test to 3,500 psi. Notify state of BOP test. Record results. 7. Shut in BOP's and pressure test casing to 3000 psi per AOGCC regulations. Record results. 8. Drill out cement and 20' minimum to 50' maximum of new hole.Perform LOT. 9. Directionally drill 9-7/8"hole with motor BHA to 6,800' MD/3,148'TVD. Run MWD/LWD logging tools in drill string as required for directional monitoring and formation data gathering. 10. Switch to rotary steerable BHA and directionally drill 9-7/8"hole to 14,281' MD/5,656' TVD. Run • MWD/LWD logging tools in drill string as required for directional monitoring and formation data gathering. k(`„}] � i 2L-304 APD RIGINPage 5 of Printed: 19-1an-10 7 A,, ,tion for Permit to Drill,Well 2L-304 Saved: 19-Jan-10 11. POOH with DP and rack back. Run 7-5/8"29.7#L-80 BTCM casing to 14,281' MD/5,656' TVD and cement. 12. Run 3-1/2"completion tubing with packer and set at+/- 13,800'MD. 13. LD DP and associated equipment. 14. ND BOP and rig up tree. Test tree and freeze protect annulus. Rig down and move out rig. . 14. Discussion of Mud and Cuttings Disposal and Annular Disposal Requirements of 20 AAC 25.005(c)(14) An application for a Permit to Drill musts be accompanied by each of the following items,except for an item already on file with the commission and identified in the application: (14)a general description of how the operator plans to dispose of drilling mud and cuttings and a statement of whether the operator intends to request authorization under 20 AAC 25.080 for an annular disposal operation in the well.; Waste fluids generated during the drilling process will be disposed of by hauling the fluids to a KRU Class II disposal well. All cuttings generated will be hauled to the Prudhoe Bay Grind and Inject Facility for temporary storage and eventual processing for injection down an approved disposal well,or stored,tested for hazardous substances,and used on pads and roads in the Kuparuk area in accordance with a permit from the State of Alaska. ConocoPhillips Alaska does intend to request authorization for the use of this well for annular disposal operations at a later date provided the well meets the regulatory requirements. 15. Attachments Attachment 1 Directional Plan Attachment 2 Drilling Hazards Summary Attachment 3 Well Schematic Attachment 4 Cement Summary 2L-304 APD Page 6 of 7 rJ Printed: 19-Jan-10 R G I N!+ L : 1: •. '' '' ,!■ 11 t, 1 I 1,1 ConocoPhillips(Alaska) Inc. Kuparuk River Unit m Kuparuk 2L Pad 11 '' Plan: 2L-304 (Tango) ,11 '1„ 7 2L-Tango IH II. A Plan: 2L-304 (wp06) Standard Proposal Report 14 January, 2010 4 . , t , 1 1 11 - 11.Ir 1Mg MI ,1•4„.0 EMI ""'"'"'"""`-`-'"' ''''''"—'- HALLIBURTON I mill, 111 III$:. AN■ Sperry Drilling Services ■111 ' Is., ■'11 ,,, 1 ORIGINAL it - ° a W W CO II O 0 o K II - N CC w IX.Z II - °o ,c2 CG c II - o —� `o �ZF pj PS' c0O N II rn I+iorn U� •�YfA vaN II _ c11 l O n M V • v3 mN'n.0 - `o°ro Cw� Z°^r II m -o a �� t8J i': F U OOU)I- a,aoo II 9p _ .c; t? "-c6. W �M� II O d - C 3a J_ W m 0 ArN C°M. Q InO r 11 C �� O O VI co LL N CO N to d 6 —lll!) O NWJZ2J 0 ,-'?tf Ma Q P o N II N \\•0.. • 0�,� _• ,. - o wJin O0i 30 0 0 fn co II 00 • \ _-0 p'v Z W'p Zlnln� F t/a , II S( \ OD Ol CqO 0t0')LLpS��m A 0000 U h N... II £ ' N - ^J O Z OR �LL O u�i o')C1 N c') Noon II QO �i I� r _p ~p5~O>in U- ONNln In �t'- II Q�� 1 II _ P O III 0 Q fV 0 1-.o N r F'N h 11 1 1 I I _ r QI- Nv• 30.- II I I II Lll _ 0 Z eoN Z ?N DO �v rn II 00 I I 11 0 _—o 'e ¢ In�N��� co F.<°o CO to 2,-,4',,-;3.7 11 SQL. I I III i O WOE- oo� dNNNO) N h II l i t ZO = 0•OO O CO C')ON O • Ur v h �On �N N�� OOOZI Z i I Ii 1- —o I ln�^��� I1 I I 1 1 0 $ on rn°0�� 11 1 I .S _ Z y C o W I I O) - O t� sw O�pmN II 0p.91 (A o mm 1 I I I - O H m O Q 7-18u)00_@ n I I N I It I LL _ c �tEnhl 0 II 00011 I I I ILL = 0 P 3°p QNU)OI-O II << I I IO - rn Z LL 1 N CO w° 0o ocor mm o II ^ I I I W - In o In CO M M F II 00 N I I J _ 0 -) N°cN_11Mpao co a) II SOL, r1 I I Z —O �+ zo av.-'� U II Z' 1 I -oLLi - rn 6 + N II LL I O 9l4iv 8 8 8 o II OQOQL in I I , -o 1-cirri Nw<o J II Ln I I NN N Uvi 0)0 LL II I I _ c W II QQ 0 o 0 I I S6. > I I C1 —0 LL' N I I i- i t _ co O co •M co 0 0 Z I I OQOS 0 I I O —0 lO 1- - I I _M - r c. M II I -_ N U th II 0098 I o _ O Nt CO 0 II I I O 0) 'c 0) II el I 1 _ r LL O 000,9 I I I o c CO I I ca~ - O Od � ■ i O r N \ I I c _ F> . O m .2 O g \ 0st 8 _ o (/)N N \ II E l o 0 to \ - — > >N V r Z N U- m CO 0 Ia m o o LL \v II 000 a m _- f Q 7 N J J l°n © \ I I F I I —o co ,YYaNN v \ II I 1 - Lc) f] I II 0099 I 1 vs V O— a) c (n \ I I i t —- O - 0_ j 0 Q \\ \ II i I -0 \ II I I - �T ■ QQ� I I o 0 \ I I I i - 40 0(9%\\\ \ II I 1 _ o0 N. V 00 4.11 11 O 0) CI I _ 0 2' •y \\\M CI 1 1 —ln Z U "CSb I I I - M o _ I - ~ U • I I - I I _ 0 N I —0 0 I ° I I _ O o LL 0p99 I I N ICI o) I I I - ln I I I —- 0 QOOE. 1 I I - N lUL I I I _ O 1 1 —o QQSZ I I I - J II _ I _ O I OQQZ I I I o I II ZI OS I I I O O ` I c II 0 o a'F' ' o O 1 I I - I I ul aco h I —° - c \ U 1 e- \ I h --_ o II 0 i I II I I I I II I I I I I I I I I I I I I I V I I I I I I I I I I I I I I Iy 'I I I I II I I I I I I I II I J 0 0 0 0 O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 J 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Q 0 U 0 In h 0 N 0 In 0 In 0 In 0 In 0 10 0 41 N ,- •- N N M 0) Nr V co u) CO CO r r _ (u!/8 009 L)4 1dad Ie3!P9A awl ORIGINAL o °$ o g _ ov Z - LLmVV N G N N ooioN2 N O E o � m 0 i 9 � w °z I0 0 - R M _ p O L co N o ^ 03 z0^� J 5c mOpo 0 - g. h �e 1.• �Of• � in �f ?N c I Bo o -- -.,n!'°i "" \ _0 Q g N O " —oo W O N S V , t'-',' C 1 ■ n - o Z M 000g, I \ w p,,p O 0. N ' , - O a ,tea o - ^ $ ep" F o OSLb_ F o0• tg.z r I \ U - O^ N C - a ' 0 3 1 \ - o O 1 O +o 0 00Sb_ 1 w w No P 0 Ca - o z° 1 \, ONO - C CC C N OSZb_ o —00 U 0 \ 01 - U 0, - I r. cel 00 ., 1 -� ; w Lt. 000b_ 1 w - Hp`,y` N 1' N - .co n - C 1,g.1 .: _g t"«d OSL£_ - N o 0 0 8®lP� cG CO V) - ° 4Mn O M V o —g 'Q U - 0 — NNNE ^ - V z scLo. M"" 00S£_ 0 W w - o cat N M \ M W w —O W S S S VJ h \ o O O o CC - Um« K W CC z .•. z m��m N o56_ �" Zozo - o y w w \ �'- H z of 0 - \c It f^u oa' M \ OSZ£_ `a�+. y MOrn uo _eo ce U Cz) O a 'O N ` M U Q y r J _ •^ — ° ci ■ 000£_ = w J - o M f-y W NI�CO N''d - o O Gn • M a • O - \ € -.) \ O U o J N z w> a - C7) ■ w Z U`> Li.- O - -E = TS LE a n o w � _ woznn� _ o � F o �oM � _0 Q CO O N ■ Z p( LL _a o RN M \ z co .-on - O o 0 2 J \ N o M 2 N O O p oOSZ_ O\8 N t - .- - M - O NN - aa C M CO M H J C1 .o o o YYJ _ �� `` " N2N � —dNtV V l w n vv I o z z 2- - O- w 0 0 < w g m o o n t-:, a) R'OSZZ_N• ao p 1 d C o 0- N 6U 1 z y G w N V = C W 0m. - 0.� y O w V - I a O J - o 0 -w . (_ ,w - o\. p 0 o w N.ww - o N WOOwMM O n OSLI O n J . - N O N CO CO w - M co O N <V'M V< DM CI _g - , In<0OO O0 _ v, .�. �InI NNwIC) _ • `Db` NO MO Nln - <10 K n(O N N 10 l 0 1 n = —O V] - - O 111111111 II I I ! III I III I I III II III II IIIII IIIl I III II III 111111 ! III ! ! III IIIII I I III I I III II III II III II IIIII 11 IIIII1 2 O O O O O O O O O O O O O O O O O O O O O O O O o O O O O O O O O O O O O O O O O O O v, O vt O v1 O vt O h 0-1 O h O h O h O h O h O V M M N N ^ N N M en Y q V1 \O (11?/8 0051)(+)111-1obj(-)41noS ORIGINAL Halliburton HALLIBURTON Standard Proposal Report Database: Alaska EDM Prod v16 Local Co-ordinate Reference: Well Plan:2L-304(Tango) Company: ConocoPhillips(Alaska)Inc. TVD Reference: Prelim:2L-304 @ 142.60ft(Prelim Elevation) • Project: Kuparuk River Unit MD Reference: Prelim:2L-304 @ 142.60ft(Prelim Elevation) Site: Kuparuk 2L Pad North Reference: - True Well: Plan:2L-304(Tango) Survey Calculation Method: Minimum Curvature Weiibore: 2L-Tango Design: 2L-304(wp06) Project Kuparuk River Unit Map System: US State Plane 1927(Exact solution) System Datum: Mean Sea Level Geo Datum: NAD 1927(NADCON CONUS) Using Well Reference Point Map Zone: Alaska Zone 04 Using geodetic scale factor Site Kuparuk 2L Pad Site Position: Northing: 5,927,695.16ft Latitude: 70°12'48.272 N From: Map Easting: 461,077.91 ft Longitude: 150°18'50.048 W Position Uncertainty: 0.00 ft Slot Radius: 0" Grid Convergence: -0.30° Well Plan:2L-304(Tango) Well Position +N/-S 0.00 ft Northing: 5,927,698.38 ft . Latitude: 70°12'48.305 N +EI-W 0.00 ft Easting: 461,092.51 ft • Longitude: 150°18'49.625 W Position Uncertainty 0.00 ft Wellhead Elevation: ft Ground Level: 117.10 ft • Weilbore 2L-Tango Magnetics Model Name Sample Date Declination Dip Angle Field Strength (°) (°) (nT) BGGM2007 12/2/2009 21.56 80.70 57,640 Design 2L-304(wp06) Audit Notes: Version: Phase: PROTOTYPE Tie On Depth: 25.50 Vertical Section: Depth From(TVD) +N/S +E/-W Direction (ft) (ft) (ft) r) 25.50 0.00 0.00 97.42 Plan Sections Measured Vertical ND Dogleg Build Turn Depth Inclination Azimuth Depth System +N/$ +EI-W Rate Rate Rate Tool Face (ft) (°) (°) (ft) ft (ft) (ft) (°/100ft); (°/100ft) (°/100ft) (°) 25.50 0.00 0.00 25.50 -117.10 0.00 0.00 0.00 0.00 0.00 0.00 325.50 0.00 0.00 325.50 182.90 0.00 0.00 0.00 0.00 0.00 0.00 700.00 11.23 92.00 697.60 555.00 -1.28 36.58 3.00 3.00 0.00 92.00 969.55 22.02 92.00 955.50 812.90 -3.96 113.54 4.00 4.00 0.00 0.00 1,069.55 22.02 92.00 1,048.21 905.61 -5.27 151.00 0.00 0.00 0.00 0.00 1,913.62 60.00 92.00 1,673.56 1,530.96 -24.25 694.44 4.50 4.50 0.00 0.00 2,173.60 72.77 94.67 1,777.50 1,634.90 -38.35 931.71 5.00 4.91 1.03 11.41 12,843.96 72.77 94.67 4,938.43 4,795.83 -867.97 11,089.31 0.00 0.00 0.00 0.00 13,790.89 56.76 144.51 5,362.60 5,220.00 -1,249.18 11,811.51 5.00 -1.69 5.26 119.64 13,863.87 56.76 144.51 5,402.60 5,260.00 -1,298.88 11,846.94 0.00 0.00 0.00 0.00 14,081.38 52.41 144.51 5,528.60 5,386.00 -1,443.19 11,949.84 2.00 -2.00 0.00 180.00 14,281.38 48.41 144.51 5,656.02 5,513.42 -1,568.66 12,039.30 2.00 -2.00 0.00 180.00 1/14/2010 2:09:35PM Page 2 COMPASS 2003.16 Build 69 O \ ! G1NAL Halliburton HALLI B U RTO N Standard Proposal Report Database: Alaska EDM Prod v16 Local Co-ordinate Reference: Well Plan:2L-304(Tango) Company: ConocoPhillips(Alaska)Inc. TVD Reference: Prelim:2L-304 @ 142.60ft(Prelim Elevation) Project: Kuparuk River Unit .Reference: Prelim2L-304©142.60ft(Prelim Elevation) Site: Kuparuk 2L Pad North Reference: True Well: Plan:2L-304(Tango) Survey Calculation Method: Minimum Curvature Wellbore: 2L-Tango Design: 2L-304(wp06) Planned Survey Measured Vertical Map Map Depth Inclination Azimuth Depth TVDss +NI-S +E/-W Northing Easting DLS Vert Section (ft) (°) r) (ft) ft (ft) (ft) (ft) (ft) -117.10 25.50 0.00 0.00 25.50 -117.10 0.00 0.00 5,927,698.38 461,092.51 0.00 0.00 SHL:147'FNL,559'FEL-Sec22,T10N,R07E 100.00 0.00 0.00 100.00 -42.60 0.00 0.00 5,927,698.38 461,092.51 0.00 0.00 200.00 0.00 0.00 200.00 57.40 0.00 0.00 5,927,698.38 461,092.51 0.00 0.00 300.00 0.00 0.00 300.00 157.40 0.00 0.00 5,927,698.38 461,092.51 0.00 0.00 325.50 0.00 0.00 325.50 182.90 0.00 0.00 5,927,698.38 461,092.51 0.00 0.00 400.00 2.23 92.00 399.98 257.38 -0.05 1.45 5,927,698.33 461,093.96 3.00 1.45 500.00 5.23 92.00 499.76 357.16 -0.28 7.96 5,927,698.06 461,100.47 3.00 7.93 600.00 8.23 92.00 599.06 456.46 -0.69 19.68 5,927,697.59 461,112.18 3.00 19.60 700.00 11.23 92.00 697.60 555.00 -1.28 36.58 5,927,696.92 461,129.07 3.00 36.44 800.00 15.23 92.00 794.93 652.33 -2.08 59.45 5,927,696.00 461,151.94 4.00 59.22 900.00 19.23 92.00 890.42 747.82 -3.11 89.06 5,927,694.81 461,181.54 4.00 88.71 969.55 22.02 92.00 955.50 812.90 -3.96 113.54 5,927,693.83 461,206.01 4.00 113.10 1,000.00 22.02 92.00 983.73 841.13 -4.36 124.95 5,927,693.38 461,217.42 0.00 124.47 1,069.55 22.02 92.00 1,048.21 905.61 -5.27 151.00 5,927,692.33 461,243.47 0.00 150.42 1,100.00 23.39 92.00 1,076.30 933.70 -5.68 162.75 5,927,691.86 461,255.21 4.50 162.12 1,200.00 27.89 92.00 1,166.43 1,023.83 -7.19 205.98 5,927,690.13 461,298.43 4.50 205.18 1,300.00 32.39 92.00 1,252.89 1,110.29 -8.94 256.14 5,927,688.12 461,348.58 4.50 255.15 1,400.00 36.89 92.00 1,335.15 1,192.55 -10.93 312.93 5,927,685.84 461,405.35 4.50 311.72 1,500.00 41.39 92.00 1,412.69 1,270.09 -13.13 376.00 5,927,683.32 461,468.39 4.50 374.54 1,600.00 45.89 92.00 1,485.05 1,342.45 -15.54 444.95 5,927,680.55 461,537.32 4.50 443.22 1,700.00 50.39 92.00 1,551.76 1,409.16 -18.14 519.36 5,927,677.57 461,611.71 4.50 517.35 1,800.00 54.89 92.00 1,612.44 1,469.84 -20.91 598.77 5,927,674.39 461,691.10 4.50 596.45 1,900.00 59.39 92.00 1,666.68 1,524.08 -23.84 682.69 5,927,671.03 461,775.00 4.50 680.05 1,913.62 60.00 92.00 1,673.56 1,530.96 -24.25 694.44 5,927,670.56 461,786.75 4.50 691.75 2,000.00 64.24 92.95 1,713.94 1,571.34 -27.56 770.71 5,927,666.86 461,862.99 5.00 767.81 2,100.00 69.15 93.96 1,753.50 1,610.90 -33.11 862.35 5,927,660.84 461,954.59 5.00 859.40 2,173.60 72.77 94.67 1,777.50 1,634.90 -38.35 931.71 5,927,655.24 462,023.92 5.00 928.86 2,200.00 72.77 94.67 1,785.33 1,642.73 -40.40 956.84 5,927,653.06 462,049.04 0.00 954.04 2,300.00 72.77 94.67 1,814.95 1,672.35 -48.17 1,052.04 5,927,644.79 462,144.18 0.00 1,049.44 2,400.00 72.77 94.67 1,844.57 1,701.97 -55.95 1,147.23 5,927,636.53 462,239.32 0.00 1,144.85 2,500.00 72.77 94.67 1,874.20 1,731.60 -63.72 1,242.43 5,927,628.26 462,334.47 0.00 1,240.25 2,600.00 72.77 94.67 1,903.82 1,761.22 -71.50 1,337.62 5,927,620.00 462,429.61 0.00 1,335.65 2,700.00 72.77 94.67 1,933.44 1,790.84 -79.27 1,432.82 5,927,611.73 462,524.76 0.00 1,431.05 2,800.00 72.77 94.67 1,963.07 1,820.47 -87.05 1,528.01 5,927,603.47 462,619.90 0.00 1,526.45 2,900.00 72.77 94.67 1,992.69 1,850.09 -94.82 1,623.21 5,927,595.20 462,715.04 0.00 1,621.85 3,000.00 72.77 94.67 2,022.31 1,879.71 -102.60 1,718.40 5,927,586.94 462,810.19 0.00 1,717.25 3,100.00 72.77 94.67 2,051.94 1,909.34 -110.38 1,813.59 5,927,578.68 462,905.33 0.00 1,812.65 3,200.00 72.77 94.67 2,081.56 1,938.96 -118.15 1,908.79 5,927,570.41 463,000.48 0.00 1,908.06 3,300.00 72.77 94.67 2,111.18 1,968.58 -125.93 2,003.98 5,927,562.15 463,095.62 0.00 2,003.46 3,400.00 72.77 94.67 2,140.81 1,998.21 -133.70 2,099.18 5,927,553.88 463,190.76 0.00 2,098.86 3,500.00 72.77 94.67 2,170.43 2,027.83 -141.48 2,194.37 5,927,545.62 463,285.91 0.00 2,194.26 3,600.00 72.77 94.67 2,200.05 2,057.45 -149.25 2,289.57 5,927,537.35 463,381.05 0.00 2,289.66 3,700.00 72.77 94.67 2,229.68 2,087.08 -157.03 2,384.76 5,927,529.09 463,476.19 0.00 2,385.06 3,800.00 72.77 94.67 2,259.30 2,116.70 -164.80 2,479.96 5,927,520.82 463,571.34 0.00 2,480.46 1/14/2010 2.09:35PM Page 3 COMPASS 2003.16 Build 69 ORIGINAL Halliburton H LLI B U RTD N Standard Proposal Report Database: Alaska EDM Prod v16 Local Co-ordinate Reference: Well Plan:2L-304(Tango) Company: ConocoPhillips(Alaska)Inc. TVD Reference: Prelim:2L-304 @ 142.60ft(Prelim Elevation) Project: Kuparuk River Unit MD Reference: Prelim:2L-304 @ 142.60ft(Prelim Elevation) Site: Kuparuk 2L Pad North Reference: True Well: Plan:2L-304(Tango) Survey Calculation Method:- Minimum Curvature Wellbore: 2L-Tango Design: 2L-304(wp06) Planned Survey Measured Vertical Map Map Depth Inclination Azimuth Depth TVDss +N-S +EI-W Northing Easting DLS Vert Section (ft) (°) r) (It) ft (ft) (ft) (ft) (ft) 2,146.32 3,900.00 72.77 94.67 2,288.92 2,146.32 -172.58 2,575.15 5,927,512.56 463,666.48 0.00 2,575.86 4,000.00 72.77 94.67 2,318.55 2,175.95 -180.35 2,670.35 5,927,504.29 463,761.63 0.00 2,671.27 4,100.00 72.77 94.67 2,348.17 2,205.57 -188.13 2,765.54 5,927,496.03 463,856.77 0.00 2,766.67 4,200.00 72.77 94.67 2,377.79 2,235.19 -195.90 2,860.73 5,927,487.76 463,951.91 0.00 2,862.07 4,300.00 72.77 94.67 2,407.42 2,264.82 -203.68 2,955.93 5,927,479.50 464,047.06 0.00 2,957.47 Surface Casing @ 4300'MD,2407'TVD:350'FNL,2397'FWL-Sec23,T10N,R07E-10 3/4" 4,400.00 72.77 94.67 2,437.04 2,294.44 -211.45 3,051.12 5,927,471.23 464,142.20 0.00 3,052.87 4,500.00 72.77 94.67 2,466.66 2,324.06 -219.23 3,146.32 5,927,462.97 464,237.35 0.00 3,148.27 4,553.79 72.77 94.67 2,482.60 2,340.00 -223.41 3,197.53 5,927,458.52 464,288.53 0.00 3,199.59 C80(K10) 4,600.00 72.77 94.67 2,496.29 2,353.69 -227.00 3,241.51 5,927,454.70 464,332.49 0.00 3,243.67 4,700.00 72.77 94.67 2,525.91 2,383.31 -234.78 3,336.71 5,927,446.44 464,427.63 0.00 3,339.07 4,722.58 72.77 94.67 2,532.60 2,390.00 -236.53 3,358.20 5,927,444.57 464,449.12 0.00 3,360.61 Camp Sand 4723'MD,2533'TVD:384'FNL,2481'FEL-Sec23,T10N,R07E-Camp Sand 4,800.00 72.77 94.67 2,555.53 2,412.93 -242.55 3,431.90 5,927,438.18 464,522.78 0.00 3,434.47 4,900.00 72.77 94.67 2,585.16 2,442.56 -250.33 3,527.10 5,927,429.91 464,617.92 0.00 3,529.88 5,000.00 72.77 94.67 2,614.78 2,472.18 -258.10 3,622.29 5,927,421.65 464,713.06 0.00 3,625.28 5,100.00 72.77 94.67 2,644.40 2,501.80 -265.88 3,717.49 5,927,413.38 464,808.21 0.00 3,720.68 5,200.00 72.77 94.67 2,674.03 2,531.43 -273.65 3,812.68 5,927,405.12 464,903.35 0.00 3,816.08 5,300.00 72.77 94.67 2,703.65 2,561.05 -281.43 3,907.87 5,927,396.85 464,998.50 0.00 3,911.48 5,400.00 72.77 94.67 2,733.28 2,590.68 -289.20 4,003.07 5,927,388.59 465,093.64 0.00 4,006.88 5,500.00 72.77 94.67 2,762.90 2,620.30 -296.98 4,098.26 5,927,380.32 465,188.78 0.00 4,102.28 5,600.00 72.77 94.67 2,792.52 2,649.92 -304.75 4,193.46 5,927,372.06 465,283.93 0.00 4,197.68 5,700.00 72.77 94.67 2,822.15 2,679.55 -312.53 4,288.65 5,927,363.79 465,379.07 0.00 4,293.09 5,800.00 72.77 94.67 2,851.77 2,709.17 -320.30 4,383.85 5,927,355.53 465,474.22 0.00 4,388.49 5,900.00 72.77 94.67 2,881.39 2,738.79 -328.08 4,479.04 5,927,347.26 465,569.36 0.00 4,483.89 6,000.00 72.77 94.67 2,911.02 2,768.42 -335.85 4,574.24 5,927,339.00 465,664.50 0.00 4,579.29 6,100.00 72.77 94.67 2,940.64 2,798.04 -343.63 4,669.43 5,927,330.73 465,759.65 0.00 4,674.69 6,200.00 72.77 94.67 2,970.26 2,827.66 -351.40 4,764.63 5,927,322.47 465,854.79 0.00 4,770.09 6,300.00 72.77 94.67 2,999.89 2,857.29 -359.18 4,859.82 5,927,314.20 465,949.93 0.00 4,865.49 6,400.00 72.77 94.67 3,029.51 2,886.91 -366.95 4,955.01 5,927,305.94 466,045.08 0.00 4,960.89 6,500.00 72.77 94.67 3,059.13 2,916.53 -374.73 5,050.21 5,927,297.68 466,140.22 0.00 5,056.30 6,600.00 72.77 94.67 3,088.76 2,946.16 -382.50 5,145.40 5,927,289.41 466,235.37 0.00 5,151.70 6,700.00 72.77 94.67 3,118.38 2,975.78 -390.28 5,240.60 5,927,281.15 466,330.51 0.00 5,247.10 6,800.00 72.77 94.67 3,148.00 3,005.40 -398.05 5,335.79 5,927,272.88 466,425.65 0.00 5,342.50 6,900.00 72.77 94.67 3,177.63 3,035.03 -405.83 5,430.99 5,927,264.62 466,520.80 0.00 5,437.90 7,000.00 72.77 94.67 3,207.25 3,064.65 -413.60 5,526.18 5,927,256.35 466,615.94 0.00 5,533.30 7,100.00 72.77 94.67 3,236.87 3,094.27 -421.38 5,621.38 5,927,248.09 466,711.09 0.00 5,628.70 7,200.00 72.77 94.67 3,266.50 3,123.90 -429.15 5,716.57 5,927,239.82 466,806.23 0.00 5,724.10 7,300.00 72.77 94.67 3,296.12 3,153.52 -436.93 5,811.77 5,927,231.56 466,901.37 0.00 5,819.50 7,400.00 72.77 94.67 3,325.74 3,183.14 -444.70 5,906.96 5,927,223.29 466,996.52 0.00 5,914.91 7,500.00 72.77 94.67 3,355.37 3,212.77 -452.48 6,002.15 5,927,215.03 467,091.66 0.00 6,010.31 7,600.00 72.77 94.67 3,384.99 3,242.39 -460.25 6,097.35 5,927,206.76 467,186.80 0.00 6,105.71 7,700.00 72.77 94.67 3,414.61 3,272.01 -468.03 6,192.54 5,927,198.50 467,281.95 0.00 6,201.11 7,800.00 72.77 94.67 3,444.24 3,301.64 -475.80 6,287.74 5,927,190.23 467,377.09 0.00 6,296.51 1/14/2010 2:09:35PM Page 4 COMPASS 2003.16 Build 69 ORIGINAL /� Halliburton NALL1 RTO. Standard Proposal Report Database: Alaska EDM Prod v16 Local Co-ordinate Reference: Well Plan:2L-304(Tango) Company: ConocoPhillips(Alaska)Inc. TVD Reference: Prelim:2L-304 @ 142.60ft(Prelim Elevation) Project: Kuparuk River Unit MD Reference: Prelim:2L-304 @ 142.60ft(Prelim Elevation) Site: Kuparuk 2L Pad North Reference: True Well: Plan:2L-304(Tango) Survey Calculation Method: Minimum Curvature Wellbore: 2L-Tango Design: 2L-304(wp06) Planned Survey Measured Vertical Map Map Depth Inclination Azimuth Depth TVDss +N/-S +E!-W Northing Easting DLS Vert Section tit) (0) (°) (ft) ft (n) (ft) (ft) (ft) 3,331.26' 7,900.00 72.77 94.67 3,473.86 3,331.26 -483.58 6,382.93 5,927,181.97 467,472.24 0.00 6,391.91 8,000.00 72.77 94.67 3,503.48 3,360.88 -491.35 6,478.13 5,927,173.70 467,567.38 0.00 6,487.31 8,100.00 72.77 94.67 3,533.11 3,390.51 -499.13 6,573.32 5,927,165.44 467,662.52 0.00 6,582.71 8,200.00 72.77 94.67 3,562.73 3,420.13 -506.90 6,668.52 5,927,157.17 467,757.67 0.00 6,678.12 8,300.00 72.77 94.67 3,592.35 3,449.75 -514.68 6,763.71 5,927,148.91 467,852.81 0.00 6,773.52 8,400.00 72.77 94.67 3,621.98 3,479.38 -522.45 6,858.91 5,927,140.65 467,947.96 0.00 6,868.92 8,500.00 72.77 94.67 3,651.60 3,509.00 -530.23 6,954.10 5,927,132.38 468,043.10 0.00 6,964.32 8,600.00 72.77 94.67 3,681.22 3,538.62 -538.00 7,049.29 5,927,124.12 468,138.24 0.00 7,059.72 8,700.00 72.77 94.67 3,710.85 3,568.25 -545.78 7,144.49 5,927,115.85 468,233.39 0.00 7,155.12 8,800.00 72.77 94.67 3,740.47 3,597.87 -553.55 7,239.68 5,927,107.59 468,328.53 0.00 7,250.52 8,900.00 72.77 94.67 3,770.09 3,627.49 -561.33 7,334.88 5,927,099.32 468,423.68 0.00 7,345.92 9,000.00 72.77 94.67 3,799.72 3,657.12 -569.10 7,430.07 5,927,091.06 468,518.82 0.00 7,441.33 9,100.00 72.77 94.67 3,829.34 3,686.74 -576.88 7,525.27 5,927,082.79 468,613.96 0.00 7,536.73 9,200.00 72.77 94.67 3,858.97 3,716.37 -584.65 7,620.46 5,927,074.53 468,709.11 0.00 7,632.13 9,300.00 72.77 94.67 3,888.59 3,745.99 -592.43 7,715.66 5,927,066.26 468,804.25 0.00 7,727.53 9,400.00 72.77 94.67 3,918.21 3,775.61 -600.20 7,810.85 5,927,058.00 468,899.39 0.00 7,822.93 9,500.00 72.77 94.67 3,947.84 3,805.24 -607.98 7,906.05 5,927,049.73 468,994.54 0.00 7,918.33 9,600.00 72.77 94.67 3,977.46 3,834.86 -615.75 8,001.24 5,927,041.47 469,089.68 0.00 8,013.73 9,700.00 72.77 94.67 4,007.08 3,864.48 -623.53 8,096.43 5,927,033.20 469,184.83 0.00 8,109.13 9,800.00 72.77 94.67 4,036.71 3,894.11 -631.30 8,191.63 5,927,024.94 469,279.97 0.00 8,204.53 9,900.00 72.77 94.67 4,066.33 3,923.73 -639.08 8,286.82 5,927,016.67 469,375.11 0.00 8,299.94 10,000.00 72.77 94.67 4,095.95 3,953.35 -646.85 8,382.02 5,927,008.41 469,470.26 0.00 8,395.34 10,100.00 72.77 94.67 4,125.58 3,982.98 -654.63 8,477.21 5,927,000.15 469,565.40 0.00 8,490.74 10,200.00 72.77 94.67 4,155.20 4,012.60 -662.40 8,572.41 5,926,991.88 469,660.55 0.00 8,586.14 10,300.00 72.77 94.67 4,184.82 4,042.22 -670.18 8,667.60 5,926,983.62 469,755.69 0.00 8,681.54 10,400.00 72.77 94.67 4,214.45 4,071.85 -677.95 8,762.80 5,926,975.35 469,850.83 0.00 8,776.94 10,500.00 72.77 94.67 4,244.07 4,101.47 -685.73 8,857.99 5,926,967.09 469,945.98 0.00 8,872.34 10,600.00 72.77 94.67 4,273.69 4,131.09 -693.50 8,953.19 5,926,958.82 470,041.12 0.00 8,967.74 10,700.00 72.77 94.67 4,303.32 4,160.72 -701.28 9,048.38 5,926,950.56 470,136.26 0.00 9,063.15 10,800.00 72.77 94.67 4,332.94 4,190.34 -709.06 9,143.57 5,926,942.29 470,231.41 0.00 9,158.55 10,900.00 72.77 94.67 4,362.56 4,219.96 -716.83 9,238.77 5,926,934.03 470,326.55 0.00 9,253.95 11,000.00 72.77 94.67 4,392.19 4,249.59 -724.61 9,333.96 5,926,925.76 470,421.70 0.00 9,349.35 11,100.00 72.77 94.67 4,421.81 4,279.21 -732.38 9,429.16 5,926,917.50 470,516.84 0.00 9,444.75 11,200.00 72.77 94.67 4,451.43 4,308.83 -740.16 9,524.35 5,926,909.23 470,611.98 0.00 9,540.15 11,300.00 72.77 94.67 4,481.06 4,338.46 -747.93 9,619.55 5,926,900.97 470,707.13 0.00 9,635.55 11,400.00 72.77 94.67 4,510.68 4,368.08 -755.71 9,714.74 5,926,892.70 470,802.27 0.00 9,730.95 11,500.00 72.77 94.67 4,540.30 4,397.70 -763.48 9,809.94 5,926,884.44 470,897.42 0.00 9,826.36 11,600.00 72.77 94.67 4,569.93 4,427.33 -771.26 9,905.13 5,926,876.17 470,992.56 0.00 9,921.76 11,700.00 72.77 94.67 4,599.55 4,456.95 -779.03 10,000.33 5,926,867.91 471,087.70 0.00 10,017.16 11,800.00 72.77 94.67 4,629.17 4,486.57 -786.81 10,095.52 5,926,859.65 471,182.85 0.00 10,112.56 11,900.00 72.77 94.67 4,658.80 4,516.20 -794.58 10,190.71 5,926,851.38 471,277.99 0.00 10,207.96 12,000.00 72.77 94.67 4,688.42 4,545.82 -802.36 10,285.91 5,926,843.12 471,373.13 0.00 10,303.36 12,100.00 72.77 94.67 4,718.04 4,575.44 -810.13 10,381.10 5,926,834.85 471,468.28 0.00 10,398.76 12,200.00 72.77 94.67 4,747.67 4,605.07 -817.91 10,476.30 5,926,826.59 471,563.42 0.00 10,494.16 12,300.00 72.77 94.67 4,777.29 4,634.69 -825.68 10,571.49 5,926,818.32 471,658.57 0.00 10,589.56 1/14/2010 2:09:35PM Page 5 COMPASS 2003.16 Build 69 ORIGINAL Halliburton I-IALLIBURTON Standard Proposal Report Database: Alaska EDM Prod v16 Local Co-ordinate Reference: Well Plan:2L-304(Tango) Company: ConocoPhillips(Alaska)Inc. 7VD Reference: Prelim:2L-304 @ 142.60ft(Prelim Elevation) Project: Kuparuk River Unit MD Reference: Prelim:2L-304 @ 142.60ft(Prelim Elevation) Site: Kuparuk 2L Pad North Reference: True Well: Plan:2L-304(Tango) Survey Calculation Method: ; Minimum Curvature Wellbore: 2L-Tango Design: 2L-304(wp06) Planned Survey Measured Vertical Map Map Depth Inclination Azimuth Depth TVDss +NI-S +E/-W Northing Easting DLS Vert Section (ft) (°) (°) (ft) ft (ft) (ft) (ft) (ft) 4,664.31 12,400.00 72.77 94.67 4,806.91 4,664.31 -833.46 10,666.69 5,926,810.06 471,753.71 0.00 10,684.97 12,500.00 72.77 94.67 4,836.54 4,693.94 -841.23 10,761.88 5,926,801.79 471,848.85 0.00 10,780.37 12,600.00 72.77 94.67 4,866.16 4,723.56 -849.01 10,857.08 5,926,793.53 471,944.00 0.00 10,875.77 12,700.00 72.77 94.67 4,895.78 4,753.18 -856.78 10,952.27 5,926,785.26 472,039.14 0.00 10,971.17 12,800.00 72.77 94.67 4,925.41 4,782.81 -864.56 11,047.47 5,926,777.00 472,134.29 0.00 11,066.57 12,843.96 72.77 94.67 4,938.43 4,795.83 -867.97 11,089.31 5,926,773.36 472,176.11 0.00 11,108.51 12,900.00 71.40 97.24 4,955.67 4,813.07 -873.50 11,142.34 5,926,767.57 472,229.11 5.00 11,161.81 13,000.00 69.05 101.93 4,989.52 4,846.92 -889.13 11,235.10 5,926,751.46 472,321.77 5.00 11,255.80 13,100.00 66.83 106.76 5,027.10 4,884.50 -912.05 11,324.85 5,926,728.08 472,411.40 5.00 11,347.77 13,200.00 64.76 111.75 5,068.13 4,925.53 -942.09 11,410.92 5,926,697.60 472,497.30 5.00 11,437.00 13,300.00 62.86 116.91 5,112.28 4,969.68 -979.02 11,492.66 5,926,660.26 472,578.84 5.00 11,522.82 13,400.00 61.16 122.24 5,159.24 5,016.64 -1,022.55 11,569.43 5,926,616.34 472,655.38 5.00 11,604.57 13,500.00 59.68 127.73 5,208.63 5,066.03 -1,072.35 11,640.66 5,926,566.17 472,726.34 5.00 11,681.64 13,600.00 58.43 133.37 5,260.08 5,117.48 -1,128.05 11,705.80 5,926,510.14 472,791.19 5.00 11,753.44 13,700.00 57.43 139.16 5,313.21 5,170.61 -1,189.22 11,764.37 5,926,448.67 472,849.43 5.00 11,819.41 13,790.89 56.76 144.51 5,362.60 5,220.00 -1,249.18 11,811.51 5,926,388.48 472,896.26 5.00 11,873.90 13,800.00 56.76 144.51 5,367.59 5,224.99 -1,255.38 11,815.93 5,926,382.26 472,900.65 0.00 11,879.09 13,863.87 56.76 144.51 5,402.60 5,260.00 -1,298.88 11,846.94 5,926,338.60 472,931.44 0.00 11,915.46 Top Formation @ 13864'MD,5403'TVD:1455'FNL,727'FWL-Sec19,T10N,R08E-S8-2L-Tango(S8) 13,900.00 56.04 144.51 5,422.59 5,279.99 -1,323.38 11,864.42 5,926,314.01 472,948.78 2.00 11,935.95 14,000.00 54.04 144.51 5,479.89 5,337.29 -1,390.11 11,911.99 5,926,247.05 472,996.01 2.00 11,991.76 14,081.38 52.41 144.51 5,528.60 5,386.00 -1,443.19 11,949.84 5,926,193.78 473,033.57 2.00 12,036.14 Base Formation @ 14081'MD,5529'TVD:1599'FNL,829'FWL-Sec19,T10N,R08E-71.5 14,100.00 52.04 144.51 5,540.01 5,397.41 -1,455.17 11,958.38 5,926,181.75 473,042.06 2.00 12,046.16 14,200.00 50.04 144.51 5,602.88 5,460.28 -1,518.48 12,003.52 5,926,118.22 473,086.87 2.00 12,099.10 14,281.21 48.42 144.51 5,655.91 5,513.31 -1,568.56 12,039.23 5,926,067.96 473,122.31 2.00 12,140.98 7 5/8" 14,281.38 48.41 144.51 5,656.02 . 5,513.42 -1,568.66 12,039.30 5,926,067.86 473,122.38 2.00 12,141.06 2L-Tango(wp05)Base Targets Target Name -hit/miss target Dip Angle Dip Dir. TVD +NI-S +E/-W Northing Easting Shape (°) (°) (ft) (ft) (ft) (ft) (ft) 2L-Tango(wp05)Base 0.00 0.00 5,528.60 -1,721.37 12,148.15 5,925,914.61 473,230.44 -plan misses target center by 226.73ft at 14281.38ft MD(5656.02 TVD,-1568.66 N,12039.30 E) -Point 2L-Tango(S8) 0.00 0.00 5,402.60 -1,298.88 11,846.94 5,926,338.60 472,931.44 -plan hits target center -Circle(radius 200.00) 1/14/2010 2•09:35PM Page 6 COMPASS 2003.16 Build 69 ORIGtNAL Halliburton I-IAL.LIBURTOIV Standard Proposal Report Database: Alaska EDM Prod v16 Local Co-ordinate Reference: Well Plan:2L-304(Tango) Company: ConocoPhillips(Alaska)Inc. ND Reference: Prelim:2L-304 @ 142.60ft(Prelim Elevation) Project: Kuparuk River Unit MD Reference: Prelim:2L-304 @ 142.60ft(Prelim Elevation) Site: Kuparuk 2L Pad North Reference: True Well: Plan:2L-304(Tango) Survey Calculation Method: Minimum Curvature Weilbore: 2L-Tango Design: 2L-304(wp06) Casing Points Measured Vertical Casing Hole Depth Depth Diameter Diameter (ft) (ft) Name ("1 (') 14,281.21 5,655.91 7 5/8" 7-5/8 9-7/8 4,300.00 2,407.42 10 3/4" 10-3/4 12-1/4 Formations Measured Vertical Vertical Dip Depth Depth Depth SS Dip Direction (ft) (ft) ft Name Lithology (°) (`) 4,722.58 2,532.60 Camp Sand 0.00 4,553.79 2,482.60 C80(K10) 0.00 13,863.87 5,402.60 S8 0.00 14,081.38 5,528.60 T1.5 0.00 Plan Annotations Measured Vertical Local Coordinates Depth Depth +NJ-S +E/-W (ft) (ft) (ft) (ft) Comment 25.50 25.50 0.00 0.00 SHL:147'FNL,559'FEL-Sec22,T1ON,R07E 4,300.00 2,407.42 -203.68 2,955.93 Surface Casing @ 4300'MD,2407'TVD:350'FNL,2397'FWL-Sec23,T1 ON,R07E 4,722.58 2,532.60 -236.53 3,358.20 Camp Sand @ 4723'MD,2533'TVD:384'FNL,2481'FEL-Sec23,T1ON,R07E 13,863.87 5,402.60 -1,298.88 11,846.94 Top Formation @ 13864'MD,5403'TVD:1455'FNL,727'FWL-Sec19,T10N,R08E 14,081.38 5,528.60 -1,443.19 11,949.84 Base Formation @ 14081'MD,5529'TVD:1599'FNL,829'FWL-Sec19,T1 ON,R08E 14,281.38 5,656.02 -1,568.66 12,039.30 BHL @ 14281'MD,5656'TVD:1725'FNL,918'FWL-Sec19,T1ON,R08E 1/14/2010 2:09:35PM Page 7 COMPASS 2003.16 Build 69 Z n 0 H L° 3 c mo Ji Q I at N In c o C g e 2 w = a) d ft 0. r N O m ; o fin u 0 N O O a O G C CU N M W O • N a O me M - R ElO z , 4 03 C t 9 a _ E 1 o 0 c Q "' ° 'd q R N f^ n' N O W W S O N ait `• J N m p II t j C N d y O IMRE 0 f 19 C ° 2 ,z ,c1" ii. Lu y W. ? V ■/t J r e m N U (2 J CL s— /+ 2 Y 1� 8 8 ` O it i Q (1) p- LI'+ p C = O a y 2 E n o 'S m o v R N 0 Q co Q N f vi ° w .§ m 0 ° M ,+ i of « a oo, LL '0 d N Q Y Y J 3 w L V 2' 'Z „ .. o 0 d a c R T.r 1 m V ��. Fa. rre V Y Y a N N Q ' i - ° A tic 1 r H CC 3 0 N co !.7 > H co ._ i Sri r .Eg5Mifm:!'!55::,!!:Mi2MiIIr „m',4 m IIH iI mii io255 ' 5; 0 P I G I '' ' ' ' q O N J m N O C '� O O N o0 ui w u) .., D .L f N N ,# !III1!;IPP O o N d ,� v a=a Z N " / / �� T� '� r U °°0000moeo oo e. MI dd000�owo o°O Fm m w/ / - ' _ ��� `�� 3 J 0LL r. 3 ( 1'..-,, \ tit" C oo eovvi GiON!V I ��1, � \ \\\ ° k•S►. > J oc CC M \\\ N °e9 l� \ \ �� ►. a Z a'C.3 N l \- �f J $°tvOue°a8�n�n°r Q li ,1 � c�ir` = 11 � o c r� ®tn� z d j i//�1',V� ` { ` 0 e,et,1rikki , � �- 6 r 2 -or ji4k` o/ ` •``iir o ogm ^. N z o 7V ,.... 4 t,C . , rv, NNaN,`� \�a /%/ iS w cp •-� `C,♦�,C� ;i'// •i e \ 1 ,/ �//�N 0 / cc 0 rno NNauao oi ro rvei`�IA /..�0r, k's :.•::iZ �" I N M I >, g000000ao';z;.- mrn merneaJ 'C 1 N Nt p NOOOnnnn ee p O -47.6- a O rvNGnp,Nnt O It M J N J L = N' 2sEstgra21-PPNN A z Nn�m�^n_Omdww a = o Y d o 0 0 0 0 0 0 0 '-mN� `"aa u U a C m O 10 0 � 10 0 10 0 N e Q�.A m 12 N 10 N N CO erevrmnmmo/-N Y gv)U u w� m . 3 >am 3 m e U — 7 O Q 2-y h W K O CL vEveiv U -.F. ,,,'.-s.26 ry 10 C> 0000000 t E N ' 0 In 0 1.0 0 0 0 0 C Etna �� p Cl 10 I,- 0 N U) 0 in 0 In N N M o Awinw E U 5 3 n7 4 U $ C O N 0 _---Ac Y `1` N i „. . • 46'23 d C V. N o N d E a U oar z C .a C N \k Y \\� 4 11\. M1 it'.. ..— \� - p ^ a a}�'o ),\�i4i 1"t>r,,. ma IIid g:;1 /r .offrl, +a” ! V' + �`'' l#,+tl ,1'., ////i//% '� `�1)I, r}d�. /�I jI'i t„ , r�. o /v}� Z gam ffi F� C �• _'"\\�P� 11J,� III/�`�'/��' '�-r,J, W =HN r = • of rrr ;,£ — -----4,: F I \\�\I/ .�, \\\ „ L ` 0 W r$ ,� f� ►y�\ r• .. ,v e A 0A 2. • ` 1�111 f1mtite J L n N N \ �� ; :f �►.q. - r �=� r ^� u c Z r •, " - i... U t w 0 y 4 W iZ*Ii� 1 g e£ a \ .. k a 2 '��a a,vN N i « . -2$2 °._a h ary N Er z o FW r N or :i...„!,„..._� N<i as^ z ,,, . \ — 11 4 .J \ faN co N N `.O \\` \ 17,4-3 \\"r Y and 1` M 0 I N J UWGINA1 N h • s. • 1 0) 0 g c C (Z4 E 0 HI as et E C • • Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y % Y Y Y Y .2 (O y y y y y y y (0 N y y (0 (0 y y N 0) y (0 y y y y y C) y y co co l6 N N N N 0 N N N 0 N 6 W N N N O 6 N N W c6 N N c0 N 0 13 Q 0. O 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 an con 0., N N y y N N y y y y y N y y y y y y y y y y y CN y y y y O 0 O O as O 0 0 0 O N O 0 O O co O O 0 CO CC O O 0 O 0 (0 O CL a a a a a 0 0 0 0 0 0 a a a a a a a a a a a a a a a a o 0 C.1 v fit E C U ` O ` `o O o ` O ` O `o O ` O ` O `o O `oO o ` O `o O C O et C O C O C O O C O C O C O C O O O O O O O O ca C l N C O C O O C N co O O C co C co C O C co Co) 2` C LL .O. LL R LL w LL r ll. LL .O. LL w LL O LL O LL t0 LL (O LL (C LL (C CL N y y O y O y O b y y O y O y O h y N y N y D O N O N O C� 0 O 0 U 0 O 0 O 5 O O O 0 O D () p O 5 O o O 0 O 0 O 0 O G C C C C C C C C C C C C C C E d 2 N N 2 N `) 2 N N ` O 2@ N N N O N ` N N N N N N d 6 O C l0 C N C N C O C 0 C O C 0 C O C N C N C N C N C N C K N O N O N O N O O O O y O O O O O O O O O y N y O y O y O U U U C) U U 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 - (O U) M U) M CO C) 0) Co CO 0 CO 0 0 N M CO CO N U) N U) O) N e- 4 O V CO M ? CO V- CO CO r C) CO CO CO O 0 O) O CO 00 O) NI- O) ? N o n r- 2 (O O CO N M N O CO. O V N st 0 0 CO N N 1` st N. V' (O 'Cr CO r-- O — — — M M N N — ,— O N O U) ' (N e- O M W CO CO W Co N N CO CO • t1 N N O N CS O li 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 N o 0 0 0 0 0 0 0 0 0 0 d 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 .- 0 0 0 0 0 0 0 0 0 O ui 0 0 0 (ri O ui O N O O 0 0 0 0 (O (ri (O N O ui O 0) ui O O N t O N. 0 N (O N. N N. lO N. 0 0 0 0 0 0 sf N. R N (O N (O N ON (O O 1� (O (O (O N N CO CO CO CO 4 N. V N. 4 ? e— CO '— M (O (O (O (O Cn CA 0 0 CD a p2 V O) co co co s{ O cO co CO W M 1 C) (O CO 0 N. 0 N. V 0 V' C O N N- 4 CO N 0 CO V C N st N st CO CO O (O M O N V N V 0 Ni- O co M L."; O 0 N n O 4 M M R V Ni W Ni N- co N O N (O N O O e- N N x- O CO CO CO CA O) M N CD (0 N. N. 1` N- 0 (O (D CO = m w m rn h • o N- N Cn O W N N- n CO CO CO CO CO 7 0 0 e- 0 CO N CO N CO CD N CO N O N 'C 0 CO O CO N M M N- ss M CO st O) st CO N CD (0 O .4 CO 4 O) st 0 0 e- 0 2 W 4 M W (O s- O M O O O O N M N CD N s- O (A O M M (O N N o 7 L Cn N- C) sf N N- < N. CO (O O) CO CO CO CO s{ 7 CO V N N CO N CO CO CO CO W 0 s{ N (O (O CO CO CO O) CO CO CO CO M ? e- CO 1— M U) M (O V) N. 1- N 0- I� (C e- s- .- '- C i V _ O O CO O sf CO CO N N. N N- N. CO CO of N CO CD 0 (D 0 0 (O 0 M E 0 N CO N N- N. CO N O CO (O CA 0 v CD N C) O) a) CO M 0 CO C E um N CO 4 N O O M 4 en (O 7 4 N N 4 6 4 O N- r r 1` a O M s 7 4- 1- e- CO CO N- N. N. N. 0 0 CO CO CO CO CO CO CO CO CO CO CO CO O y E (a M CO J •_ N R I p N O N- N CO O CO (O N. r CO M CO CO CO 4 0 0 O CA N M N M (O N CO N- O. 'O CO M CO O N M co a- V CO CO 4 CD 4 CO N CD CO CO t CA 7 CO < O 0) ,— (O O V CO 4 M CO O O M O O O O N Ch N OO N O Di O CA M N N N 3 N O• L Cn N- CO 4 (O N. < N- M (O CA CO C) co N CO C) s{ V O 4 N N CO N CO W CO CD M TTY C V y a i (O V (O (O (O CO CO CO CA CO CO CO co co 4 e- co co N (O N (O 1� f- N V� Q m M _ d p e- W N N ri .► t a 2 V M ▪ O c z N J O I 2 . E J o rn c T C• A O O N a e 3 3 /.7... V CO C = L O N 0 0 s. as O� M M No « O C C Z Q d.V E N N L.O 0 O a t7yo m l' 03 m 0.) C) CO el O y 0 CO CO 0 0 I". r0 fA Q R O O O O a Q � d PN CV C1 3 N N 00 0 Lc, CO CO as N. N C J � � M co O O 1- O O el E Y O O CC o 0 0 0 0 0 0 0 ON N M M N N ) IX •K J CO O a T n E a s M 0? M M M M M (' ) M M M M M M M M J J M M ' 2 'a 8 J J J J J J J J m m J J J J J J J J N N J J � "L.' O M CO d O O t X p N J y y N N N N N N N N N N N N N N N N 1 ) CAN U Z �- J N U m , v) (D N N. CO CO CO m , e- M M (n (n N- N. N- N- rn 0 0 0 J 0 0 0 0 0 0 0 0 0 0 m O C O C N M M M M M CO CO CO CO CO CO CO CO c.) CSI Ch C7 Cl M M M M M M M Ch O O •� Z OI O N O Y O O o 0 J J J J J J J J J J J J J J J J '— e- C N O y J J J J N N N N N N N N N N N N N N N N N N N N M M CD ■• O O y E V N N N N ) ) i ( ) ) ) ) ) ) ) ) r 1 ) ) ) ) ) ) ) ) J J MI 4 O 0 7 (6 A N (O r Cn (T) (n (n co co (O N N- N- 0) O) N N 4 , O C w 2 a Q CO CO CO CO 0 o O o 0 0 0 0 0 0 V T O , E 0 0 0 0 co co co co 0) co co co co co co co co co co co co co (�) co co co C C ✓ ` • O = J J J J J J J J J J J J J J J J J J J J J J J J J J (6 l0 w C C CO N N N N N N N N N N N N N N N N N N N N N N N N N N d d H K y N ea A '§ m „ / / / as 0 a R . 2 \ ! ■ a Ow 2 \ 2 © ■ E / �f s E 0 S > J $ = 2 } 0fi1, kk ( \ 0u E2 it k_ 2 � 0E � i o g #£ 0. / 0 as ƒ 0 E Ea C) � ® - _ � ° a_ I k _� A o / ƒ \ �£ \\ $ \ a C a � ■ § § _ Z 2 � ® \ | 2 k § 2 § F. CO a . skk CV k$ § � E � \ \ / k ■ � ; # _ 2 • f I 0 I ••U - � qk ■ a oo 4.) �g as o k � � ` g e E Cl � 00 � o 2 f i u. e ! # CC fora ( ' at 0 \ � � � � 3 c2 E. ` ` c « 2 § & '' 0 ° ° 7 A | ® ] � ) ; m « � - - I a a 6 .1 ■ :§ 2 § - E .1 2 a � E ' \ k 2 ) _ . r ■ ° ® I In { \ 3 2 f \ \ / ( \ , « 2 2 a W Al A a 0 7 QRJG ! NAL N C. C (n p cn N o 0 > o et 7-1 IC C M {A c,_ E CI N N CO CO CD > CA a (J Co Z Mo 0 > o Q. N c� CO I- CD J CO CO r- O N ✓ J M d. O O O O N M M M M J M m O 4) J J J J J J _I J N J V 0 J N N N N N a N N N N d N O N CO O O O O E ,- co- Ili r- I` Oi _ U MO p M co co co co co M co co co co O l J J J J J J _1 J J J J M N N N N N N N N N N N N N J ui I) O Oi v- co lfi I- 1` O N M M O M M O O M O pp M M M M M C C v. M N N N _11 N N N N N N N N N d N 4i + 44i * 4 * + 4 + 4c I I v,, I I I v I M I _N I I O I I I O to I I I _- O CD I I I m �, I I ✓ I Is I 1 VI L0 J I I N \:1 I I C m \II I I O d :, O 4 o I -' 1 I O O I CO 0 ' 1 I I - Q- `_ .' I . 1 CD co p 5 J ' > H _II 1 O -i--. N �1 �� i1 N CD- CU , �� \N `� iii TE o o t -I - --`-- -- - ---1- -`, ----1-- CV�� :,'_. .:j L N A CO `,' 1 % 1 i CUmms o �` 1 LL Za)z N 4.- 711111147%;2' — O CD L ,- o of m I 0 so,0 2 -. N N C O d Q 6 I I I ■ m , c N ? `r O illH O O O In O Ln T Q + o 2 (u/1005) uoi eeda as ua 01 a a O `o c I . � > 1 U U 1 OR1GJN ' N G C = cn O c i2 el O= > h o c c cs — d N Q `Y 5 ftf O U C. 0 m co o z 4 d ; O J O .0 0. c7 c > > > > 8 > > > > h. > N a J e- CO O N O O O O N 1- .- co J J J J C J Q N N d N J J N J 8 FI,= N N N .,..c CV Cn C N m L6 n m p) e- C7 Cn t` C` O U (h M O O O O co O O 9 Q C? C? C.? M M J f J J J J J J J J J J J C) N N N N N N (N N N N N N N J c) C•) O O O O O '-- (h 6 n r O N O 9 Q C C C C � � C C c? c? C c J J J J J J _J J _J J J J J J N (NI N N N N N N N N N N N o_ N /1) 1 - _§ 0 _ 1 1Y h. Ill' w p O d CL N _ W 0 co M LL �i -r-o 0i •1 I c - �1 - n o w k — 0 co a a) O N - ....sise... .11 - 8 111" V co Ix CS w COO 1- owl � „ i iii o as C r r cN 8 Q Q d W n d vi ri N o . _ (u!/o9.Z)Jo;oej uoi;eaedag Q m U ORIGINAL 2L-304 Drilling Hazards Summary 13-1/2" Hole/ 10-3/4" Casing Interval Event Risk Level Mitigation Strategy Broach of Conductor Low Monitor cellar continuously during interval. Gas Hydrates Moderate If observed-control drill,reduce pump rates,reduce drilling fluid temperatures,Additions of Lecithin. Gravel/Sand Sloughing Moderate Increase mud weight/viscosity,High viscosity sweeps. Monitor fill on connections Hole Swabbing/Tight Hole on Moderate • Circulate hole clean prior to trip. Proper hole fill(use of Trips trip sheets),Pumping out of hole as needed. Lost Circulation Low Prevent by keeping hole clean. If losses occur-reduce pump rates and mud rheology,use LCM 9-7/8" Hole/7-5/8" Casing Interval Event Risk Level Mitigation Strategy Shale stability in HRZ and K-1 Moderate Control with higher MW and proper drilling practices. High ECD and swabbing with Moderate Condition mud prior to trips. Monitor ECD's with PWD higher MW's required tool while drilling across pay interval. Pump and rotate out on trips as a last resort. Abnormal Reservoir Pressure Low Follow mud weight schedule and do not fall behind. Stripping Drills,Shut-in Drills,PWD Tools,Increased mud weight as needed. Ensure adequate kick tolerance prior to drilling pay interval. Lost Circulation Low Use PWD to monitor hole cleaning. Reduced pump rates,Mud rheology,LCM. Use GKA LC decision tree. 2L-304 Hazards.doc ORIGINAL Prepared by Mike Greener Page 1 of 1 2L-304 Producer ¶onocoPhillips 3-1/2" Completion String (1 3 /" Camco'DS'Nipple w12.875" No-G o Profile, EUE 8RD 30" x 16" 62.6# mod, at--500'MD +1- 110' MD —4H • 3 1/2" 9.3#L-80 EUE 8RD mod tubing • 10-314"45.5#L-80 BTC G� +1- 4,300' MD 12,407' TV D 3-1/2" Camco KBMG-LTS Chemical InjectionMandrel EUE 8RD --3,250' TVD with 318" encapsulated control line to surface GLM# Type Depth(TVD) Depth(MD) Valve Type • 1 KBMG 2,400' 4,274' Dummy 2 KBMG 3,600' 8,327' Dummy 3 KBMG 4,728' 12,133' Dummy 4 KBMG 5,228' 13,537' SOV • 3-1/2" Baker'CMU' Sliding Sleeve(closed) with C amco 2.813" ( 'DS' profile, EUE 8RD mod,located 1 joint above PBR r l�l • iii y r 3-1/2" x 7-518" Baker FHL Packer with PBR, EUE 8RD mod, placed< 400' MD above the perforated interval - 13,700' MD /5,313' TVD • 3-1/2" Camco'D' Nipple w12.75" N o-Go Profile and RHC plug • EUE 8RD mod,located 1 full joint below packer ' 3 1/2" Wireline Entry Guide, EUE 8RD mod,located— 65' MD above top of Bermuda - 13,800' MD 15,368' TVD • • c�PArforations— 14,100' to 14,120' MD 7-518" 29.7#L-80 BTCM I \I1 @ 14,281' MD 15,656' TVD 2L-304 Schlumberger CemCADE Preliminary Job Design 10-3/4" Surface Casin. WP-05 V2 Preliminary Job Design based on limited input data.For estimate purposes only. Rig: Doyon 16 Volume Calculations and Cement Systems Location: Tarn Volumes are based on 300%excess in the permafrost and 50%excess below the Client:CPAI Revision Date: 01/19/2010 permafrost. The top of the tail slurry is designed to be at-3,300'MD. Prepared by: Mike Martin Location:Anchorage,AK Lead Slurry Minimum pump time: 305 min. (pump time plus 120 min.) Phone: (907)263-4207 ARCTICSET Lite @ 10.7 ppg-4.51 ft3/sk Mobile: (907)748-6900 email: martin13 @slb.com 0.6381 ft3/ft x(80')x 1.00 (no excess)= 51 ft3 0.3637 ft3/ft x(1620'-80')x 4.00 (300% excess)= 2240 ft3 < TOC at Surface 0.3637 ft3/ft x (3300'- 1620')x 1.50 (50% excess)= 917 ft3 51 ft3+2240 ft3+917 ft3= 3208 ft3 3208 ft3/4.51 ft3/sk= 712 sks Round up to 720 sks Have--270 sacks additional ASL on location for Top Out stage, if necessary. Previous Csg. Tail Slurry Minimum pum time: 200 min. (pump time plus120 min.) < 16",62.6#casing 12.0 ppg DeepCRETE + additives- 1.64 ft3/sk at 80'MD 0.3637 ft3/ft x(4300'-3300')x 1.50 (50% excess)= 546 ft3 0.53997 ft3/ft x 80' (Shoe Joint)= 43 ft3 546 ft3+43 ft3= 589 ft3 589 ft3/1.64 ft3/sk= 360 sks Round up to 370 sks BHST = 77'F, Estimated BHCT= 73`F. < Base of Permafrost at (BHST calculated using a gradient of 2.0F/100 ft. from surface) 1,620 MD(1,503'TVD) PUMP SCHEDULE Pump Rate Stage Stage Time Cumulative Stage (bpm) Volume (min) Time (bbl) (min) CW100 5.0 10.0 2.0 2.0 < Top of Tail at Pressure test lines 0.0 0.0 10.0 12.0 3,300'MD CW100 5.0 40.0 8.0 20.0 MUDPUSH II 5.0 50.0 10.0 30.0 Drop bottom plug 0.0 0.0 5.0 35.0 ASL 6.0 571.4 95.2 130.2 DeepCRETE Tail 6.0 104.9 17.5 147.7 Drop top plug 0.0 0.0 5.0 152.7 Water 5.0 20.0 4.0 156.7 Switch to rig 0.0 0.0 3.0 159.7 < 10-3/4",45.5#casing Mud 8.0 379.9 47.5 207.2 in 13-1/2"OH Slow& bump plug 3.0 6.0 2.0 209.2 MUD REMOVAL TD at 4,300'MD (2,416'TVD) Expected Mud Properties:9.6 ppg, Pv<25, Ty<35 Spacer Properties: 10.5 ppg MudPUSH* II, Pv=20-25,Ty=30-35 Centralizers: As per CPAi program. Recommend minimal per joint on Shoe and 1 per joint thru tail cement column Mark of Schlumberger ORIGINAL 2L-304 Schlumberger CemCADE Preliminary Job Design 7-5/8" Longstring (WP-05) V2 - TOC Preliminary Job Design based on limited input data.For estimate purposes only. Rig: Doyon 16 Location: Alpine Client:CPAI Revision Date: 01/19/2010 Volume Calculations and Cement Systems Prepared by: Mike Martin Volumes are based on 50%excess.The top of the tail slurry is designed to be Location:Anchorage,AK P rY 9 Phone: (907)263-4207 -12,500' MD. Mobile: (907)748-6900 email: martin13 @slb.com Tail Slurry Minimum pump time: 220 min. (pump time plus 120 min.) 15.8 ppg Class G +2.0 gps D600G + 0.2%D46, 0.6%D65, 0.03 gps D177- 1.17 ft3/sk 0.2148 ft3/ft x(14295'- 12500')x 1.50 (50% excess)= 579 ft3 0.2578 ft3/ft x 80' (Shoe Joint)= 21ft3 579 ft3+21 ft3= 600 ft3 600 ft3/1.17 ft3/sk= 513 sks Previous Csg. Round up to 515 sks < 10-3/4",45.5.#casing at 4,300'MD BHST= 144'F, Estimated BHCT = 112'F. (BHST calculated using a gradient of-2.1F/100 ft. below the permafrost) PUMP SCHEDULE Pump Rate Stage Stage Time Cumulative Stage (bpm) Volume (min) Time (bbl) (min) CW100 5.0 30.0 6.0 6.0 MUDPUSH II 5.0 40.0 8.0 14.0 Drop bottom plug 0.0 0.0 5.0 23.0 GasBLOK Slurry 6.0 106.7 17.8 40.8 Drop top plug 0.0 0.0 5.0 45.8 Water 5.0 10.0 2.0 47.8 Switch to rig 0.0 0.0 3.0 50.8 < Top of Cement at Mud 8.0 636.7 79.6 130.4 Slow& bump plug 3.0 6.0 2.0 132.4 12,500'MD MUD REMOVAL Expected Mud Properties: 10.0 ppg, Pv< 15, Ty< 15. < 7-5/8",29.7#casing in 9-7/8"OH Spacer Properties: 11.5 ppg MudPUSH* II, Pv=20-25,Ty=35-40 Centralizers: As per CPAi program TD at 14,295'MD (5,665'TVD) ORIGINAL O O O O co M .. • .0 0 O N • °o O o N- . N- V' v Ce LL o U Q ° _ - O O • -rE . M ° 00 1 d N CO o C C•1 0 o +^▪ 1 w CC 0. Q U O w O W _1 L I N O ..5 N W ! r Lo V Q • CL. ° W o0 O O O o o O ° O O O Co O V. o O O o O ° 0° °O CO CO LO LO LO TRANSMITTAL LETTER CHECKLIST WELL NAME Kuparuk River Unit 2L-304 PTD# 2100110 X Development Service Exploratory Stratigraphic Test Non-Conventional Well FIELD: KUPARUK RIVER POOL: TARN OIL POOL Circle Appropriate Letter/Paragraphs to be Included in Transmittal Letter CHECK ADD-ONS WHAT (OPTIONS) TEXT FOR APPROVAL LETTER APPLIES MULTI LATERAL The permit is for a new wellbore segment of existing well Permit No. (If last two digits in API No. . Production should continue to API number are be reported as a function of the original API number stated above. between 60-69) PILOT HOLE In accordance with 20 AAC 25.005(f), all records, data and logs acquired for the pilot hole must be clearly differentiated in both well name ( PH) and API number (50- - - ) from records, data and logs acquired for well SPACING The permit is approved subject to full compliance with 20 AAC EXCEPTION 25.055. Approval to perforate and produce / inject is contingent upon issuance of a conservation order approving a spacing exception. assumes the liability of any protest to the spacing exception that may occur. DRY DITCH All dry ditch sample sets submitted to the Commission must be in SAMPLE no greater than 30' sample intervals from below the permafrost or from where samples are first caught and 10' sample intervals through target zones. Non-Conventional Please note the following special condition of this permit: Well production or production testing of coal bed methane is not allowed for (name of well) until after (Company Name) has designed and implemented a water well testing program to provide baseline data on water quality and quantity. (Company Name) must contact the Commission to obtain advance approval of such water well testing program. Rev: 1/11/2008 E TO v cn CU a N0 0 z .�. N o o a) -o 2 V Q o J° co cn c m Q < E a) F- ors xr n N O OU L a) a a) O) o E a) 2 w e o 6 o 0 o.s m• cn o o ,� c a a rn O o m E Z n 2 o o 13 a > r E 0 0 v o C- 0) V m N- co a) t- n OS O .j a) 0 N 65 3 0 U) L- — _.. Q Q Q @ O a) 0 co �-. 2 0 V �- 3 L Q O o -c 0 V) N 3 N a) w 0 O co 0 0 Ui c a) a -0 Y c`'> ate) O 3 7 F o o D a) c -c 3 o E 3 Cs M 3 *6 8> E a' a v, a a rn 2 I- Z o °' o 0 a M o (0 LU N ,r, Ce w ct C coo °o v o w co M Y a Q O co a) F C m n Z O) co 3 N Q co C N M iv• o O v, — Q 0 m o co o O m 0 w a) N w y n C D O Z Q. 0 Ur) n II co O ur U J > QQ o Q Y C N 2 > L 0 a) 0 0 Q C F CC cn w N n N • O) °' N N co c w S c E L 5 2 n ti a 0 > t o 3 >` "O -p o m c o @ c a) o .0 Qo cf0i W 3 o v, oo a) c , n ° 0 m 0 N CO 0 -� D m N �_ n E N n -0 U) _ E > > II C a) N Z v Q IX 3 0 p is Q E o Q o ' % c CO N o D ) O O Q m co Q N N 0- �. — Z co Y U Z F Q I 2 w 2 0 w Q Q Q IF) ai a) a) a) aai a) U) a) U) a) 0 Q Q Q Q aa)) Q a) o a) a) a) Q aa)) aN) a) a) a) a) a) a) Q o a) Q Q Q `43 n Z >- >- >- >- >- >- >- >- >- >- >- >- z z z z >- z >- Z >- >- >- Z >- >- >- >- >- >- >- >- z Z >- Z Z Z U) o 1 w T a CO U 'n o c @ m 0 c E 3 — E a) o 0 o C N a ) * U) O o 0 • , a Q ; T Q N • C w O p 0 m 0 c - 3 E 3 0 M ..�) U 0) o C c '- O o .Z .c O N E N V) J 0 N 0 Q O O E a O "Op > 0 N 0 a N 0 ti N N a)•z 7 p LL. C J `t jn c0 p c 7 Q _o a) a ° Q �' m aci op °) ago 03 a@i aNi o as tIo N N O J E d U) n CO C.c p 3 0 v O co > a o N p_ 30 0 a) CO@ >. _ a) ° o ors E aa) 0 '5 o M 73 0 • = a Q' U. = t O O Z .0 co 3 O cn c co L c U) 5 Q (, 0 < N Ul a) a) O)•Z '0 O C 'O o a) C 7 a7 () 0- 0 O C p m o 0 O) a) Q L C C 2 C p Q. E E — 'O C C E N O M C C N F -C O d 0 Q C y L m E N o n C Ce Y o o a 0 p o@ o c co D o rn U 'n a s a) o o U d 2- .0 3 o > ra N T cc c Q Q... o 00 w a) c C >, O 3 4o V (0 .@ O y N O 0 0 O CO o E 'E •f0 (0. Q. s- - U) T O o 0 c• D J E' n 0 0 a) -c _0 o o a) C CU — $ c `o E S 3 a) a m .c m' 3 = a) E -, _ c .C. 3 @ 03 t t -. co 0 N 'O N C 0 N N •- a) 0 0. co n n 3 0 O " 3, c E o ' ° '°,_ @ cr. @ •3 •3 af0i ° ° aNi a ° y a ° ° 3 0 = Z w U Q 7,11 O`, C a) 0 n N N a ° .E 0 C o °} °' ° C N p o U)' -p E a) C‘3 a). E. L 0) o N n U). 7 c J 0 n a). -0 a) a N 0 n (A tp a C V N 0 n o ED ED _ -o a) ,- a -p f9 E co O :... 0 C O ul o S L CO O. a. O a) O. U) U). L U) 0) C- a7 a7 a7 @ O) as p N 8 0 0 3 N 'O U) O V) 0 L lc Q ,(0 a). C a) a) 0. a) C 0 C of ] ] h Y U) _g .LD p N '. V ? = o N 'O .y O d Q 0 N' c n n a U) •>, V) 0� .] 3 L W C N N > C (0 a) Q 0- w ° p 0 U Q) 4; T � a) -, U ao) E T. 9 2 a°) c0a .D o � c C • N co) • w @, -o -o O •'m • r 3 m p uS 7, o 0 m c ac) c o E t O 0 0 3 m m co m 0 0 E. m. 3 0 > o v m m — °) a) m m = c 0 0 0 CO 0 c z C a) 0 0 0 m 0 0 0 `) a) 0 o c C.) a) o o = as -`o co v% ° E .3 N c 0 9 0 v '0 m 0 '> @ ° — a) n v o 0 > > 3 0) o Q m a) w w Y Y a) r n E a CO U m 0' m a) a) a) a) 0 E E C y 3 , C C 't F F F -U) a) m > _ Q 0- p $ 0 E w a) c m a) a) c, 0 -0 a s a) a> CO o O 0. 2 2 2 a) -o CO -0 V C 0 0 t 0 a) a`) as m a) o 0 $, ia .__In cn . 000; QU ' ¢ az UuoOOOO < < wommU " 2 000) 0) 0 7`' a E O — N M V t0 c0 N CO 0) O — N M 7 )1') c0 N M 0) O r- N M V' co c0 N- 00 0) ' N CO V co W O �- �- N N N N N N N N N N M M M M M M M M M M o ;. U O O O a) O a) O a) O a) C N N N U C " 0 o 0 O O N o n o l N N U s r C O•'E ; w O E N E `a o c Q 0) O G o U ` a Q < 0 w � 0 c3 .2- u) Well History File APFENDX I nfo n cation of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history file. To improve the readability of the Well History file and to simplify finding information, information of this nature is accumulated at the end of the file under APPENDIX. No special effort has been made to chronologically organize this category of information. Sperry-Sun Drilling Services LIS Scan Utility $Revision: 3 $ LisLib $Revision: 4 $ Tue Apr 27 12 :01:55 2010 Reel Header Service name LISTPE Date 10/04/27 Origin STS Reel Name UNKNOWN Continuation Number 01 Previous Reel Name UNKNOWN Comments STS LIS Writing Library. Scientific Technical Services Tape Header Service name LISTPE Date 10/04/27 Origin STS Tape Name UNKNOWN Continuation Number 01 Previous Tape Name UNKNOWN Comments STS LIS Writing Library. Scientific Technical Services Physical EOF Comment Record TAPE HEADER Kuparuk River Field MWD/MAD LOGS WELL NAME: 2L-304 API NUMBER: 501032061300 OPERATOR: ConocoPhillips Alaska, Inc. LOGGING COMPANY: Sperry Drilling TAPE CREATION DATE: 27-APR-10 JOB DATA MWD RUN 1 MWD RUN 2 MWD RUN 3 JOB NUMBER: MW-000707601 MW-000707601 MW-000707601 LOGGING ENGINEER: B. SCHULZE B. STEPHENS B. STEPHENS OPERATOR WITNESS: G. WHITLOCK G. WHITLOCK S. HEIM MWD RUN 4 MAD RUN 4 JOB NUMBER: MW-000707601 MW-000707601 LOGGING ENGINEER: B. SCHULZE B. SCHULZE OPERATOR WITNESS: G. WHITLOCK G. WHITLOCK # I SURFACE LOCATION SECTION: 22 TOWNSHIP: lON RANGE: 7E FNL: 147 FSL: 910-014 L FEL: 558 FWL: ELEVATION (FT FROM MSL 0) KELLY BUSHING: .00 DERRICK FLOOR: 142.18 GROUND LEVEL: 114.90 WELL CASING RECORD OPEN HOLE CASING DRILLERS BIT SIZE (IN) SIZE (IN) DEPTH (FT) 1ST STRING 13 .500 16.000 110.0 2ND STRING 9.875 10.750 4297.0 3RD STRING 9.875 10.750 4297.0 PRODUCTION STRING REMARKS: 1. ALL DEPTHS ARE BIT DEPTHS UNLESS OTHERWISE NOTED. THESE DEPTHS ARE MEASURED DEPTH (MD) . 2. ALL VERTICAL DEPTHS ARE TRUE VERTICAL DEPTH (TVD) . 3. MWD RUN 1-2 COMPRISED DIRECTIONAL, DUAL GAMMA RAY (DGR) UTILIZING GEIGER-MUELLER TUBE DETECTORS, ELECTROMAGNETIC WAVE RESISTIVITY PHASE-4 (EWR-P4) , AND DRILLSTRING DYNAMICS SENSOR (DDSr) . MWD RUN 2 ALSO INCLUDED A PRESSURE WHILE DRILLING (PWD) SENSOR. 4. MWD RUN 3 COMPRISED DIRECTIONAL, DUAL GAMMA RAY (DGR) UTILIZING GEIGER-MUELLER TUBE DETECTORS, ELECTROMAGNETIC WAVE RESISTIVITY PHASE-4 (EWR4) , AZIMUTHAL LITHO-DENSITY (ALD) , COMPENSATED THERMAL NEUTRON POROSITY (CTN) , DRILLSTRING DYNAMICS SENSOR (DDSr) , PRESSURE WHILE DRILLING (PWD) , AND AT-BIT GAMMA (ABG) UTILIZING SCINTILLATION DETECTORS, BEHIND A GEOPILOT ROTARY STEERABLE ASSEMBLY. 5. MWD RUN 4 COMPRISED DIRECTIONAL, DUAL GAMMA RAY (DGR) UTILIZING GEIGER-MUELLER TUBE DETECTORS, ELECTROMAGNETIC WAVE RESISTIVITY PHASE-4 (EWR4) , AZIMUTHAL LITHO-DENSITY (ALD) , COMPENSATED THERMAL NEUTRON POROSITY (CTN) , DRILLSTRING DYNAMICS SENSOR (DDSr) , AND PRESSURE WHILE DRILLING (PWD) , BEHIND A PERFORMANCE DRILL MOTOR ASSEMBLY. 6. MWD DATA ARE CONSIDERED PDC AS PER AN E-MAIL FROM LISA WRIGHT (CPAI) TO BRYAN BURINDA (SPERRY DRILLING) CITING INSTRUCTIONS FROM WAYNE CAMPAIGN (CPAI) ON 22-APR-2010. 7. MWD RUNS 1-4 REPRESENT WELL 2L-304 WITH API#: 50-103-20613-00. THIS WELL REACHED A TOTAL DEPTH (TD) OF 14,340'MD, 5687'TVD. SEXP = EWR PHASE-4 9" 2 MHZ PHASE SHIFT RESISTIVITY SESP = EWR PHASE-4 15" 2 MHZ PHASE SHIFT RESISTIVITY SEMP = EWR PHASE-4 27" 2 MHZ PHASE SHIFT RESISTIVITY SEDP = EWR PHASE-4 39" 1 MHZ PHASE SHIFT RESISTIVITY SFXE = FORMATION EXPOSURE TIME EWR PHASE-4 SROP = RATE OF PENETRATION WHILE DRILLING SGRC = GAMMA RAY COMBINED SNP2 = NEAR DETECTOR PE FACTOR (RAPID SAMPLE) LOW COUNT RATE BIN. SBD2 = BULK DENSITY COMPENSATED (RAPID SAMPLE) LOW COUNT RATE BIN SCO2 = DELTA-RHO (RAPID SAMPLE) LOW COUNT RATE BIN TNPS = THERMAL NEUTRON POROSITY - SANDSTONE MATRIX CTFA = SMOOTHED AVERAGE OF FAR DETECTOR'S COUNT RATE CTNA = SMOOTHED AVERAGE OF NEAR DETECTOR'S COUNT RATE SRAT = RATE OF ACQUISTION DURING MEASUREMENT AFTER DRILLING (MAD) NOTE A "M" AFTER THE MNEMONICS INDICATES DATA ACQUIRED DURING A MAD PASS. PARAMETERS USED IN NUCLEAR LOG PROCESSING: HOLE SIZE: CALIPER (ACAL) MUD WEIGHT: 9.5 TO 9.8 PPG WHOLE MUD CHLORIDES: 400 TO 650 PPM CL MUD TYPE: WBM FORMATION WATER SALINITY: 19, 149 PPM CL FLUID DENSITY: 1.0 G/CC MATRIX DENSITY 2.65 G/CC LITHOLOGY: SANDSTONE ALL DATA CURVES ARE SMOOTHED TO A STEP OF 0.5 FT, WITH A WINDOW OF 0.6 FT, EXCEPT FOR SROP AND SGRC. THESE CURVES ARE SMOOTHED WITH A 1.1 FT WINDOW. GAP FILL IS SET TO 5 FT FOR ALL CURVES. File Header Service name STSLIB.001 Service Sub Level Name Version Number 1 0 0 Date of Generation 10/04/27 Maximum Physical Record65535 File Type LO Previous File Name STSLIB.000 Comment Record FILE HEADER FILE NUMBER: 1 EDITED MERGED MWD Depth shifted and clipped curves; all bit runs merged. DEPTH INCREMENT: .5000 FILE SUMMARY PBU TOOL CODE START DEPTH STOP DEPTH RPM 161.5 14276.0 FET 161.5 14276.0 RPX 161.5 14276.0 RPS 161.5 14276.0 RPD 161.5 14276.0 GR 168.5 14292.0 ROP 226.5 14340.0 NPHI 6314.5 14240.0 FCNT 6314.5 14240.0 NCNT 6314.5 14240.0 PEF 6327.5 14253 .5 RHOB 6327.5 14253 .5 DRHO 6327.5 14253 .5 $ BASELINE CURVE FOR SHIFTS: CURVE SHIFT DATA (MEASURED DEPTH) EQUIVALENT UNSHIFTED DEPTH BASELINE DEPTH $ MERGED DATA SOURCE PBU TOOL CODE BIT RUN NO MERGE TOP MERGE BASE MWD 1 225.0 4310.0 MWD 2 4310.0 6405.0 MWD 3 6405.0 14071.0 MWD 4 14071.0 14340.0 $ REMARKS: MERGED MAIN PASS. $ Data Format Specification Record Data Record Type 0 Data Specification Block Type 0 Logging Direction Down Optical log depth units Feet Data Reference Point Undefined Frame Spacing 60 .1IN Max frames per record Undefined Absent value -999 Depth Units Datum Specification Block sub-type. . .0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 FCNT MWD CP30 4 1 68 4 2 NCNT MWD CP30 4 1 68 8 3 RHOB MWD G/CC 4 1 68 12 4 DRHO MWD G/CC 4 1 68 16 5 RPD MWD OHMM 4 1 68 20 6 RPM MWD OHMM 4 1 68 24 7 RPS MWD OHMM 4 1 68 28 8 RPX MWD OHMM 4 1 68 32 9 FET MWD HR 4 1 68 36 10 GR MWD API 4 1 68 40 11 PEF MWD B/E 4 1 68 44 12 ROP MWD FPH 4 1 68 48 13 NPHI MWD PU 4 1 68 52 14 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 161.5 14340 7250.75 28358 161.5 14340 FCNT MWD CP30 639.24 2149.05 861.901 15852 6314.5 14240 NCNT MWD CP30 121850 170187 136160 15852 6314.5 14240 RHOB MWD G/CC 1.999 2.712 2.33627 15853 6327.5 14253 .5 DRHO MWD G/CC -0.012 0.227 0.0568875 15853 6327.5 14253 .5 RPD MWD OHMM 0.89 2000 32.6984 28147 161.5 14276 RPM MWD OHMM 0.97 2000 13 .1029 28147 161.5 14276 RPS MWD OHMM 1.17 325.83 8.46098 28147 161.5 14276 RPX MWD OHMM 1.18 93.93 6.65113 28147 161.5 14276 FET MWD HR 0.28 161.8 2.16932 28147 161.5 14276 GR MWD API 16.87 216.18 107.311 28248 168.5 14292 PEF MWD B/E 2 .12 8.06 3.23702 15853 6327.5 14253 .5 ROP MWD FPH 0.37 6394.01 148.066 28228 226.5 14340 NPHI MWD PU 9.83 46.88 31.1489 15852 6314.5 14240 First Reading For Entire File 161.5 Last Reading For Entire File 14340 File Trailer Service name STSLIB.001 Service Sub Level Name Version Number 1 0 0 Date of Generation 10/04/27 Maximum Physical Record65535 File Type LO Next File Name STSLIB.002 Physical EOF File Header Service name STSLIB.002 Service Sub Level Name Version Number 1 0 0 Date of Generation 10/04/27 Maximum Physical Record65535 File Type LO Previous File Name STSLIB.001 Comment Record FILE HEADER FILE NUMBER: 2 EDITED MERGED MAD Depth shifted and clipped curves; all MAD runs merged using earliest passes. DEPTH INCREMENT: .5000 FILE SUMMARY PBU TOOL CODE START DEPTH STOP DEPTH NPHI 13712 .5 14098.0 FCNT 13712 .5 14098.0 NCNT 13712 .5 14098.0 RHOB 13725.5 14112 .0 DRHO 13725.5 14112 .0 PEF 13725.5 14112 .0 RPX 13747.5 14134.0 RPD 13748.0 14134 .0 RPM 13748.0 14134.0 RPS 13748.0 14134.0 FET 13748.0 14134.0 GR 13764.0 14150.5 RAT 13812.5 14199.0 MERGED DATA SOURCE PBU TOOL CODE MAD RUN NO. MAD PASS NO. MERGE TOP MERGE BASE MWD 4 1 13812 .5 14199.0 $ REMARKS: MERGED MAD PASS. $ Data Format Specification Record Data Record Type 0 Data Specification Block Type 0 Logging Direction Down Optical log depth units Feet Data Reference Point Undefined Frame Spacing 60 . lIN Max frames per record Undefined Absent value -999 Depth Units . Datum Specification Block sub-type. . .0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 FCNT MAD CP30 4 1 68 4 2 NCNT MAD CP30 4 1 68 8 3 RHOB MAD G/CC 4 1 68 12 4 DRHO MAD G/CC 4 1 68 16 5 RPD MAD OHMM 4 1 68 20 6 RPM MAD OHMM 4 1 68 24 7 RPS MAD OHMM 4 1 68 28 8 RPX MAD OHMM 4 1 68 32 9 FET MAD HR 4 1 68 36 10 GR MAD API 4 1 68 40 11 PEF MAD B/E 4 1 68 44 12 RAT MAD FPH 4 1 68 48 13 NPHI MAD PU 4 1 68 52 14 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 13712 .5 14199 13955.8 974 13712.5 14199 FCNT MAD CP30 557.29 1878.53 996.23 772 13712.5 14098 NCNT MAD CP30 114182 168602 141478 772 13712.5 14098 RHOB MAD G/CC 2.003 2.598 2.37514 774 13725.5 14112 DRHO MAD G/CC -0.006 0.228 0.0497519 774 13725.5 14112 RPD MAD OHMM 1.65 13 .54 5.63763 773 13748 14134 RPM MAD OHMM 1.66 13 . 93 5.45449 773 13748 14134 RPS MAD OHMM 1.69 15.07 5.44947 773 13748 14134 RPX MAD OHMM 1.62 14.38 5.30037 774 13747.5 14134 FET MAD HR 8.08 181.41 149.512 773 13748 14134 GR MAD API 80.65 398.57 132.422 774 13764 14150.5 PEF MAD B/E 1.89 4 .65 2.77796 774 13725.5 14112 RAT MAD FPH 2.08 341.55 144.367 774 13812.5 14199 NPHI MAD PU 12 .27 46.31 24.9195 772 13712.5 14098 First Reading For Entire File 13712.5 Last Reading For Entire File 14199 File Trailer Service name STSLIB.002 Service Sub Level Name Version Number 1 0 0 Date of Generation 10/04/27 Maximum Physical Record65535 File Type LO Next File Name STSLIB.003 Physical EOF File Header Service name STSLIB.003 Service Sub Level Name Version Number 1 0 0 Date of Generation 10/04/27 Maximum Physical Record65535 File Type LO Previous File Name STSLIB.002 Comment Record FILE HEADER FILE NUMBER: 3 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 1 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH SFXE 161.5 4245.0 SEXP 161.5 4245.0 SESP 161.5 4245.0 SEDP 161.5 4245.0 SEMP 161.5 4245.0 SGRC 168.5 4253.0 SROP 226.5 4310.0 LOG HEADER DATA DATE LOGGED: 25-MAR-10 SOFTWARE SURFACE SOFTWARE VERSION: Insite DOWNHOLE SOFTWARE VERSION: 6.02 DATA TYPE (MEMORY OR REAL-TIME) : Memory TD DRILLER (FT) : 4310.0 TOP LOG INTERVAL (FT) : 225.0 BOTTOM LOG INTERVAL (FT) : 4310.0 BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG MINIMUM ANGLE: .0 MAXIMUM ANGLE: 74.3 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER DGR Dual Gamma Ray 11321776 EWR4 EWR Phase-4 81797 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN) : 13.500 DRILLER'S CASING DEPTH (FT) : 110.0 BOREHOLE CONDITIONS MUD TYPE: Native/Spud Mud MUD DENSITY (LB/G) : 9.50 MUD VISCOSITY (S) : 120.0 MUD PH: 9.1 MUD CHLORIDES (PPM) : 650 FLUID LOSS (C3) : 6.0 RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT) : 4.000 70.0 MUD AT MAX CIRCULATING TERMPERATURE: 3 .572 81.4 MUD FILTRATE AT MT: 4.500 70.0 MUD CAKE AT MT: 5.000 70.0 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN) : TOOL STANDOFF (IN) : EWR FREQUENCY (HZ) : REMARKS: Data Format Specification Record Data Record Type 0 Data Specification Block Type 0 Logging Direction Down Optical log depth units Feet Data Reference Point Undefined Frame Spacing 60 .lIN Max frames per record Undefined Absent value -999 Depth Units Datum Specification Block sub-type. . .0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 RPD MWD010 OHMM 4 1 68 4 2 RPM MWD010 OHMM 4 1 68 8 3 RPS MWD010 OHMM 4 1 68 12 4 RPX MWD010 OHMM 4 1 68 16 5 FET MWD010 HR 4 1 68 20 6 GR MWD010 API 4 1 68 24 7 ROP MWD010 FPH 4 1 68 28 8 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 161.5 4310 2235.75 8298 161.5 4310 RPD MWD010 OHMM 1.39 2000 97.2738 8168 161.5 4245 RPM MWD010 OHMM 1.69 2000 33 .682 8168 161.5 4245 RPS MWD010 OHMM 1.83 325.83 18.4326 8168 161.5 4245 RPX MWD010 OHMM 1.95 93.93 12.8039 8168 161.5 4245 FET MWD010 HR 0.28 2.66 0.882872 8168 161.5 4245 GR MWD010 API 16.87 140.33 80.8285 8170 168.5 4253 ROP MWD010 FPH 8.67 6394.01 175.486 8168 226.5 4310 First Reading For Entire File 161.5 Last Reading For Entire File 4310 File Trailer Service name STSLIB.003 Service Sub Level Name Version Number 1 0 0 Date of Generation 10/04/27 Maximum Physical Record65535 File Type LO Next File Name STSLIB.004 Physical EOF File Header Service name STSLIB.004 Service Sub Level Name Version Number 1 0 0 Date of Generation 10/04/27 Maximum Physical Record65535 File Type LO Previous File Name STSLIB.003 Comment Record FILE HEADER FILE NUMBER: 4 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 2 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH SGRC 4253 .5 6357.5 SFXE 4287.0 6341.5 SEMP 4287.0 6341.5 SEDP 4287.0 6341.5 SESP 4287.0 6341.5 SEXP 4287.0 6341.5 SROP 4310.5 6405.0 LOG HEADER DATA DATE LOGGED: 29-MAR-10 SOFTWARE SURFACE SOFTWARE VERSION: Insite DOWNHOLE SOFTWARE VERSION: 6.02 DATA TYPE (MEMORY OR REAL-TIME) : Memory TD DRILLER (FT) : 6405.0 TOP LOG INTERVAL (FT) : 4310.0 BOTTOM LOG INTERVAL (FT) : 6405.0 BIT ROTATING SPEED (RPM) : - HOLE INCLINATION (DEG MINIMUM ANGLE: 71.4 MAXIMUM ANGLE: 77.8 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER DGR Dual Gamma Ray 132482 EWR4 EWR Phase-4 216787 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN) : 9.875 DRILLER'S CASING DEPTH (FT) : 4297.0 BOREHOLE CONDITIONS MUD TYPE: Polymer MUD DENSITY (LB/G) : 9.55 MUD VISCOSITY (S) : 54.0 MUD PH: 9.7 MUD CHLORIDES (PPM) : 450 FLUID LOSS (C3) : 5.0 RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT) : 2.100 76.0 MUD AT MAX CIRCULATING TERMPERATURE: 2.169 100.1 MUD FILTRATE AT MT: 2.500 66.0 MUD CAKE AT MT: 2.150 66.0 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN) : TOOL STANDOFF (IN) : EWR FREQUENCY (HZ) : REMARKS: Data Format Specification Record Data Record Type 0 Data Specification Block Type 0 Logging Direction Down Optical log depth units Feet Data Reference Point Undefined Frame Spacing 60 .1IN Max frames per record Undefined Absent value -999 Depth Units Datum Specification Block sub-type. . .0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 RPD MWD020 OHMM 4 1 68 4 2 RPM MWD020 OHMM 4 1 68 8 3 RPS MWD020 OHMM 4 1 68 12 4 RPX MWD020 OHMM 4 1 68 16 5 FET MWD020 HR 4 1 68 20 6 GR MWD020 API 4 1 68 24 7 ROP MWD020 FPH 4 1 68 28 8 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 4253 .5 6405 5329.25 4304 4253 .5 6405 RPD MWD020 OHMM 0.89 2000 12.1225 4110 4287 6341.5 RPM MWD020 OHMM 0.97 470.18 5.27614 4110 4287 6341.5 RPS MWD020 OHMM 1.19 17.44 4.95413 4110 4287 6341.5 RPX MWD020 OHMM 2 .23 14.52 4.65957 4110 4287 6341.5 FET MWD020 HR 0.31 105.39 2 .4735 4110 4287 6341.5 GR MWD020 API 37.24 152.69 107.974 4209 4253.5 6357.5 ROP MWD020 FPH 9.79 585.62 171.909 4190 4310.5 6405 First Reading For Entire File 4253 .5 Last Reading For Entire File 6405 File Trailer Service name STSLIB.004 Service Sub Level Name Version Number 1 0 0 Date of Generation 10/04/27 Maximum Physical Record65535 File Type LO Next File Name STSLIB.005 Physical EOF File Header Service name STSLIB.005 Service Sub Level Name Version Number 1 0 0 Date of Generation 10/04/27 Maximum Physical Record65535 File Type LO Previous File Name STSLIB.004 Comment Record FILE HEADER FILE NUMBER: 5 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 3 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH CTFA 6314.5 13981.5 TNPS 6314.5 13981.5 CTNA 6314.5 13981.5 SNP2 6327.5 13995.0 SBD2 6327.5 13995.0 SCO2 6327.5 13995.0 SEMP 6342 .0 14018.0 SEXP 6342.0 14018.0 SESP 6342.0 14018.0 SFXE 6342.0 14018.0 SEDP 6342.0 14018.0 SGRC 6358.0 14034 .0 SROP 6405.5 14071.0 LOG HEADER DATA DATE LOGGED: 09-APR-10 SOFTWARE SURFACE SOFTWARE VERSION: Insite DOWNHOLE SOFTWARE VERSION: 6.02 DATA TYPE (MEMORY OR REAL-TIME) : Memory TD DRILLER (FT) : 14071.0 TOP LOG INTERVAL (FT) : 6405.0 BOTTOM LOG INTERVAL (FT) : 14071.0 BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG MINIMUM ANGLE: 69.4 MAXIMUM ANGLE: 73 .3 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER DGR Dual Gamma Ray 275518 EWR4 EWR Phase-4 11179702 CTN Comp Thermal Neutron 185457 ALD Azimuthal Litho Dens 1205035 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN) : 9.875 DRILLER'S CASING DEPTH (FT) : 4297.0 BOREHOLE CONDITIONS MUD TYPE: Polymer MUD DENSITY (LB/G) : 9.60 MUD VISCOSITY (S) : 43 .0 MUD PH: 9.5 MUD CHLORIDES (PPM) : 450 FLUID LOSS (C3) : 5.0 RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT) : 2.100 68.0 MUD AT MAX CIRCULATING TERMPERATURE: 1.011 148.5 MUD FILTRATE AT MT: 2.200 68.0 MUD CAKE AT MT: 2.000 68.0 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN) : TOOL STANDOFF (IN) : EWR FREQUENCY (HZ) : REMARKS: Data Format Specification Record Data Record Type 0 Data Specification Block Type 0 Logging Direction Down Optical log depth units Feet Data Reference Point Undefined Frame Spacing 60 .1IN Max frames per record Undefined Absent value -999 Depth Units Datum Specification Block sub-type. . .0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 FCNT MWD030 CP30 4 1 68 4 2 NCNT MWD030 CP30 4 1 68 8 3 RHOB MWD030 G/CC 4 1 68 12 4 DRHO MWD030 G/CC 4 1 68 16 5 RPD MWD030 OHMM 4 1 68 20 6 RPM MWD030 OHMM 4 1 68 24 7 RPS MWD030 OHMM 4 1 68 28 8 RPX MWD030 OHMM 4 1 68 32 9 FET MWD030 HR 4 1 68 36 10 GR MWD030 API 4 1 68 40 11 PEF MWD030 B/E 4 1 68 44 12 ROP MWD030 FPH 4 1 68 48 13 NPHI MWD030 PU 4 1 68 52 14 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 6314.5 14071 10192.8 15514 6314.5 14071 FCNT MWD030 CP30 639.24 2149.05 857.78 15335 6314 .5 13981.5 NCNT MWD030 CP30 121850 170187 135977 15335 6314.5 13981.5 RHOB MWD030 G/CC 1.999 2.712 2.33433 15336 6327.5 13995 DRHO MWD030 G/CC -0.012 0.227 0.057128 15336 6327.5 13995 RPD MWD030 OHMM 1.4 37.25 4.78999 15353 6342 14018 RPM MWD030 OHMM 1.35 31.4 4.53502 15353 6342 14018 RPS MWD030 OHMM 1.37 16.09 4.22563 15353 6342 1 14018 RPX MWD030 OHMM 1.3 15.45 3.98235 15353 6342 14018 FET MWD030 HR 0.32 62.07 1.66095 15353 6342 14018 GR MWD030 API 51.18 216.18 120.338 15353 6358 14034 PEF MWD030 B/E 2 .14 8.06 3.24612 15336 6327.5 13995 ROP MWD030 FPH 0.5 579.53 130.661 15332 6405.5 14071 NPHI MWD030 PU 9.83 46.88 31.2628 15335 6314.5 13981.5 First Reading For Entire File 6314.5 Last Reading For Entire File 14071 File Trailer Service name STSLIB.005 1 Service Sub Level Name Version Number 1 0 0 Date of Generation 10/04/27 Maximum Physical Record65535 File Type LO 1 Next File Name STSLIB.006 Physical EOF File Header Service name STSLIB.006 Service Sub Level Name Version Number 1 0 0 Date of Generation 10/04/27 Maximum Physical Record65535 File Type LO Previous File Name STSLIB.005 Comment Record FILE HEADER FILE NUMBER: 6 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 4 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH CTFA 13982.0 14240.0 TNPS 13982.0 14240.0 CTNA 13982.0 14240.0 SNP2 13995.5 14253.5 SCO2 13995.5 14253 .5 SBD2 13995.5 14253 .5 SEDP 14018.5 14276.0 SFXE 14018.5 14276.0 SESP 14018.5 14276.0 SEMP 14018.5 14276.0 SEXP 14018.5 14276.0 SGRC 14034.5 14292.0 SROP 14071.5 14340.0 LOG HEADER DATA DATE LOGGED: 16-APR-10 SOFTWARE SURFACE SOFTWARE VERSION: Insite DOWNHOLE SOFTWARE VERSION: 6.02 DATA TYPE (MEMORY OR REAL-TIME) : Memory TD DRILLER (FT) : 14340.0 TOP LOG INTERVAL (FT) : 14071.0 BOTTOM LOG INTERVAL (FT) : 14340.0 BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG MINIMUM ANGLE: 52 .2 MAXIMUM ANGLE: 53.9 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER DGR Dual Gamma Ray 132482 EWR4 EWR Phase-4 216787 CTN Comp Thermal Neutron 231173 ALD Azimuthal Litho Dens 126973 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN) : 9.875 DRILLER'S CASING DEPTH (FT) : 4297.0 BOREHOLE CONDITIONS MUD TYPE: Polymer MUD DENSITY (LB/G) : 9.70 MUD VISCOSITY (S) : 40.0 MUD PH: 9.3 MUD CHLORIDES (PPM) : 400 FLUID LOSS (C3) : 5.0 RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT) : 2.100 68.0 MUD AT MAX CIRCULATING TERMPERATURE: 1.229 127.3 MUD FILTRATE AT MT: 2 .180 68.0 MUD CAKE AT MT: 2.050 68.0 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN) : TOOL STANDOFF (IN) : EWR FREQUENCY (HZ) : REMARKS: Data Format Specification Record Data Record Type 0 Data Specification Block Type 0 Logging Direction Down Optical log depth units Feet Data Reference Point Undefined Frame Spacing 60 .1IN Max frames per record Undefined Absent value -999 Depth Units Datum Specification Block sub-type. . .0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 FCNT MWD040 CP30 4 1 68 4 2 NCNT MWD040 CP30 4 1 68 8 3 RHOB MWD040 G/CC 4 1 68 12 4 DRHO MWD040 G/CC 4 1 68 16 5 RPD MWD040 OHMM 4 1 68 20 6 RPM MWD040 OHMM 4 1 68 24 7 RPS MWD040 OHMM 4 1 68 28 8 RPX MWD040 OHMM 4 1 68 32 9 FET MWD040 HR 4 1 68 36 10 GR MWD040 API 4 1 68 40 11 PEF MWD040 B/E 4 1 68 44 12 ROP MWD040 FPH 4 1 68 48 13 NPHI MWD040 PU 4 1 68 52 14 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 13982 14340 14161 717 13982 14340 FCNT MWD040 CP30 700.3 1544.54 984.124 517 13982 14240 NCNT MWD040 CP30 128286 164038 141596 517 13982 14240 RHOB MWD040 G/CC 2.238 2.533 2.3938 517 13995.5 14253.5 DRHO MWD040 G/CC -0.006 0.106 0.0497524 517 13995.5 14253 .5 RPD MWD040 OHMM 1.24 8.13 4.77469 516 14018.5 14276 RPM MWD040 OHMM 1.18 8.2 4.61397 516 14018.5 14276 RPS MWD040 OHMM 1.17 8.54 4 .5656 516 14018.5 14276 RPX MWD040 OHMM 1.18 8.44 4.52517 516 14018.5 14276 FET MWD040 HR 1.44 161.8 35.2364 516 14018.5 14276 GR MWD040 API 93.04 190.26 133.589 516 14034.5 14292 PEF MWD040 B/E 2 .12 4.75 2 .96696 517 13995.5 14253.5 ROP MWD040 FPH 0.37 65.92 42.0867 538 14071.5 14340 NPHI MWD040 PU 17.6 38.43 27.7714 517 13982 14240 First Reading For Entire File 13982 Last Reading For Entire File 14340 File Trailer Service name STSLIB.006 Service Sub Level Name Version Number 1 0 0 Date of Generation 10/04/27 Maximum Physical Record65535 File Type LO Next File Name STSLIB.007 Physical EOF File Header Service name STSLIB.007 Service Sub Level Name Version Number 1 0 0 Date of Generation 10/04/27 Maximum Physical Record65535 File Type LO Previous File Name STSLIB.006 Comment Record FILE HEADER FILE NUMBER: 7 RAW MAD Curves and log header data for each pass of each run in separate files. DEPTH INCREMENT: .5000 MAD RUN NUMBER: 4 MAD PASS NUMBER: 1 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH CTNA 13712.5 14098.0 TNPS 13712.5 14098.0 CTFA 13712.5 14098.0 SBD2 13725.5 14112.0 SCO2 13725.5 14112.0 SNP2 13725.5 14112 .0 SEXP 13747.5 14134.0 SEDP 13748.0 14134.0 SEMP 13748.0 14134.0 SFXE 13748.0 14134.0 SESP 13748.0 14134.0 SGRC 13764.0 14150.5 SRAT 13812 .5 14199.0 LOG HEADER DATA DATE LOGGED: 16-APR-10 SOFTWARE SURFACE SOFTWARE VERSION: Insite DOWNHOLE SOFTWARE VERSION: 6.02 DATA TYPE (MEMORY OR REAL-TIME) : Memory TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG MINIMUM ANGLE: 52.2 MAXIMUM ANGLE: 53.9 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER DGR Dual Gamma Ray 132482 EWR4 EWR Phase-4 216787 • CTN Comp Thermal Neutron 231173 ALD Azimuthal Litho Dens 126973 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN) : 13 .500 DRILLER'S CASING DEPTH (FT) : 4297.0 BOREHOLE CONDITIONS MUD TYPE: Polymer MUD DENSITY (LB/G) : 9.70 MUD VISCOSITY (5) : 40.0 MUD PH: 9.3 MUD CHLORIDES (PPM) : 400 FLUID LOSS (C3) : 5.0 RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT) : 2.100 68.0 MUD AT MAX CIRCULATING TERMPERATURE: 1.229 127.3 MUD FILTRATE AT MT: 2.180 68.0 MUD CAKE AT MT: 2.050 68.0 NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN) : TOOL STANDOFF (IN) : EWR FREQUENCY (HZ) : REMARKS: $ Data Format Specification Record Data Record Type 0 Data Specification Block Type 0 Logging Direction Down Optical log depth units Feet Data Reference Point Undefined Frame Spacing 60 .1IN Max frames per record Undefined Absent value -999 Depth Units Datum Specification Block sub-type. . .0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 FCNT MAD041 CP30 4 1 68 4 2 NCNT MAD041 CP30 4 1 68 8 3 RHOB MAD041 G/CC 4 1 68 12 4 DRHO MAD041 G/CC 4 1 68 16 5 RPD MAD041 OHMM 4 1 68 20 6 RPM MAD041 OHMM 4 1 68 24 7 RPS MAD041 OHMM 4 1 68 28 8 RPX MAD041 OHMM 4 1 68 32 9 FET MAD041 HR 4 1 68 36 10 GR MAD041 API 4 1 68 40 11 PEF MAD041 B/E 4 1 68 44 12 RAT MAD041 FPH 4 1 68 48 13 NPHI MAD041 PU 4 1 68 52 14 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 13712.5 14199 13955.8 974 13712.5 14199 FCNT MAD041 CP30 557.29 1878.53 996.23 772 13712.5 14098 NCNT MAD041 CP30 114182 168602 141478 772 13712 .5 14098 RHOB MAD041 G/CC 2 .003 2.598 2.37514 774 13725.5 14112 DRHO MAD041 G/CC -0.006 0.228 0.0497519 774 13725.5 14112 RPD MAD041 OHMM 1.65 13.54 5.63763 773 13748 14134 RPM MAD041 OHMM 1.66 13.93 5.45449 773 13748 14134 RPS MAD041 OHMM 1.69 15.07 5.44947 773 13748 14134 RPX MAD041 OHMM 1.62 14.38 5.30037 774 13747.5 14134 FET MAD041 HR 8.08 181.41 149.512 773 13748 14134 GR MAD041 API 80.65 398.57 132 .422 774 13764 14150.5 PEF MAD041 B/E 1.89 4.65 2.77796 774 13725.5 14112 RAT MAD041 FPH 2 .08 341.55 144.367 774 13812.5 14199 NPHI MAD041 PU 12.27 46.31 24.9195 772 13712.5 14098 First Reading For Entire File 13712.5 Last Reading For Entire File 14199 File Trailer Service name STSLIB.007 Service Sub Level Name Version Number 1 0 0 Date of Generation 10/04/27 Maximum Physical Record65535 File Type LO Next File Name STSLIB.008 Physical EOF Tape Trailer Service name LISTPE Date 10/04/27 Origin STS Tape Name UNKNOWN Continuation Number 01 Next Tape Name UNKNOWN Comments STS LIS Writing Library. Scientific Technical Services Reel Trailer Service name LISTPE Date 10/04/27 Origin STS Reel Name UNKNOWN Continuation Number 01 Next Reel Name UNKNOWN Comments STS LIS Writing Library. Scientific Technical Services Physical EOF Physical EOF End Of LIS File Nov ConochiIIi s p Alaska, Inc. FINAL WELL REPORT MUDLOGGING DATA 2L-304 Provided by: CANRIG I) ii i.i� . Ilrn\(CCCC,i Lru. Approved by: Lisa M.Wright Compiled by: Lees F. Browne Jr. Tollef Winslow Distribution: 4/26/10 Date: 4/16/10 0/0 'OH /%q5 ConocoPhillips Alaska.Inc. 2L-304 TABLE OF CONTENTS 1 MUDLOGGING EQUIPMENT&CREW 2 1.1 Equipment Summary 2 2 WELL DETAILS 3 2.1 Well Summary 3 2.2 Hole Data 3 2.3 Daily Activity Summary 4 3 GEOLOGICAL DATA 7 3.1 Lithostratigraphy 7 3.2 Mudlog Summary 8 3.3 Connection Gases 13 3.4 Trip(Wiper)Gases 14 3.5 Sampling Program/Sample Dispatch 15 3.6 Isotube Gas Samples 16 4 PRESSURE/FORMATION STRENGTH DATA 18 4.1 Pore Pressure Gradient Evaluation 18 4.2 Quantitative Methods 19 5 DRILLING DATA 20 5.1 Survey Data 20 5.2 Bit Record 24 5.3 Mud Record 25 6 DAILY REPORTS 27 Enclosures 2"/100' Formation Log (MD/TVD) 2"/100' Drilling Dynamics Log (MD/TVD) 2"/100' FIT Gas Log (MD 2"/100' LWD/Lithology Log (MD/TVD) CANRIG ConocoPhillips Alaska.Inc. 2L-304 1 MUDLOGGING EQUIPMENT & CREW 1.1 Equipment Summary Parameter Equipment Type/Position Total Comments Downtime QGM Agitator and Gas Trap (Mounted in possum belly) Ditch as Flame ionization total gas 0 and chromatography. Effective Circulating Density Pressure While Drilling 0 (ECD) (PWD) Hook Load/Weight on bit Totco WITS Feed 2 days* Intermittent throughout well Mud Flow In Derived from Strokes/Minute 2 days" and Pump Output Mud Flow Out Totco WITS Feed 2 days* Mudlogging unit computer HP Compaq Pentium 4 0 system (x2: DML& Rigwatch) Mudlogging unit Acromeg In-unit data 2 days* box collection/distribution center Pit Volumes, Pit Gain/Loss Totco WITS Feed 2 days* Pump Pressure Totco WITS Feed 2+ days* Sensor inoperable or out of calibration Pump stroke counters Totco WITS Feed 2 days* Totco Well Monitoring Totco computer networked 2 days* Components in Mudlogging Unit Rate of penetration Totco WITS Feed 2 days* RPM Totco WITS Feed 2 days* Sensor inoperable Torque Totco WITS Feed 4 days+ and/or out of calibration *Totco WITS feed not available at spud depth, and only sporadic connectivity through surface hole. Crew • Unit Type Unit Number : ML056 Mudloggers Years Days Sample Catchers Years Days Technician Days Lees Browne 30 33 Ryan Boothe 1.5 10 Howard Lamp 1 Tollef Winslow 2 34 Zachery Mester 0.5 26 Bennie Hicks 2.0 17 9 Years experience as Mudlogger .2 Days at wellsite between spud and total depth of well 2 CANRIG ConocoPhillips Alaska,Inc. 2L-304 2 WELL DETAILS 2.1 Well Summary Well: 2L-304 API Index#: 50-103-20613-00-00 Field: Kuparuk River Unit Surface Co-Ordinates: 147'FNL,559'FEL, Tarn Oil Pool Sec 22,T1ON,R7E,UM Borough: North Slope Primary Target Depth: 13,844MD/5,400'TVD State: Alaska Total Depth: 14,265'MD/5,656'TVD Rig Name/Type: Doyon 16, Arctic Triple Suspension Date: 4/21/10 Primary Target: Bermuda Formation License: N/A Spud Date: 03/22/2010 Ground Elevation: 117.1'AMSL Completion Date: 04/16/2010 RT Elevation: 142.6'AMSL Completion Status: Completed Producer Secondary Target: None Depth: Classification: Producer TD Date: 4/16/2010 TD Formation: Bermuda/Tango(S8) Days Testing: N/A Days Drilling: 26 2.2 Hole Data Maximum Depth Mud Shoe Depth Hole TD Dev. Casing/ LOT MD TVDSS Weight MD TVDSS Section (ft) (ft) Formation (ppg) ( inc) Liner (ft) (ft) (Pin) 13%" 4310' -4167 NA 9.7 72 10%" 4297' -4155 16.0 9%" 14340' -5544 C35 9.6-9.7 52 7%" Additional Comments: Logging Crew released once casing was on bottom. No information available on last LOT 3 CANRIG ConocoPPhillips Alaska.Inc. 2L-304 2.3 Daily Activity Summary 3/23/10 Rig up the unit to drill formation. Drill out from surface conductor pipe taking surveys as needed to steer away from surface. 3/24/10 Drill formation with routine surveys. 3/25/10 Drill formation with routine surveys. 3/26/10 Drill formation to 4310' and pump a high viscosity sweep. Rotate and reciprocate the hole and pull out of the hole for a wiper trip. Back ream to the HWDP with the hole being tight at 590'.Work through the tight section and run in the hole and tag at 690'. Work through the tight spot and run in the hole to 4310'with no fill found at the bottom. Circulate bottoms up with wiper gas at 305 units. Pull out of the hole with tight spots at 1475, 1141, 1114 and 1090'. Stand back the HWDP and jars and lay down the drill collars. Down load the MWD data and lay down the BHA. 3/27/10 Finish laying down the drilling BHA and clean and clean the rig floor. Make up the stack washer and break down the top drive. Rig up to run 10.75"casing. Run in the hole to 4266' and reciprocate the hole pumping 6 bpm with a maximum gas reading of 275 units. Rig up the cement head and test the cement lines to 3500 psi. Pump the cement to the hole and rig down the cement lines. Prepare to start nippling down. 3/28/10 Nipple down the diverter line and clean the rig floor of casing tools. Nipple up the casing and tubing spool and nipple up the BOPE and function test all BOPE components. Remove an ice plug from the kill line and test the BOPE to 250 low and 3500 psi high. Test the annular to 250 low and 2500 high. 3/29/10 Rig down the BOP test equipment and blow down all the lines. Gather up the BHA and service the top drive. Make up the BHA and load the MWD source. Pick up the BHA and shallow test the MWD tools. Pick up the drill pipe to 4193' and wash down and bypass the gas detector and shale shakers. Test the casing to 3000 psi and hold for 30 minutes. Break down the test equipment and wash down and tag the float equipment at 4213'. Drill out the float equipment to 4216'and run in the hole to locate the top of the cement. 3/30/10 Wash and rotate down and tag and drill through the cement at 4292'. Tag and drill through the shoe at 4294'.Tag bottom at 4310'and drill formation to 4330'. Pump a high viscosity sweep and pull out of the hole to 4290'. Obtain a fit/lot at 860 psi/16 ppg EMW and clean the mud pits and change over the mud to LSND. Drill formation from 4330'to 4543', in which the equalizer line froze from the new pits to the old pits.Work to thaw out for four hours. Drill formation to 4895'. 3/31/10 Drill formation from 4895'to 6407'and pump a high viscosity sweep and circulate and condition the hole. 4/1/10 Increase the mud weight from 9.5 to 9.6 and back ream from 6407'to the shoe. Pump a high viscosity sweep with a maximum gas reading from TD to the shoe of 46 units. Trouble shoot the top drive and back ream out of the hole from the shoe with a maximum gas of 7 units. Download the MWD data and lay down the BHA. Clean the rig floor and make up the stack washer and wash out the stack. 4/2/10 Wash the stack and function test the rams and break down the top drive. Make up the mule shoe and run in the hole to 2066'. Circulate and condition the hole with a maximum gas of 2 units. Repair the top drive and circulate and condition the hole and pull out of the hole to the surface. Clean the rig floor and make up the BHA. Make up the geo pilot and new bit. Upload the MWD tool and shallow test the MWD tool. Test the link to the geo pilot(good). Load the nukes and run in the hole on 5"drill pipe singles. 4 CANRIG Conoc Phillips Alaska.Inc. 2L-304 4/3/10 Pick up the drill pipe from 1494'to 4350'and run in the hole from the derrick to 6247'. Pump through a tight spot at 5014'. Ream down to bottom from 6247'to 6343'and displace the old drilling mud with new LSND drilling mud. Trip gas was 9 units and drilling was resumed from 6407'to 7387'. The top drive was inspected and serviced and drilling resumed. 4/4/10 Drilling formation with routine connections for 24 hours. 4/5/10 Drill formation to 9921'and lost returns.Attempted to pull up=overpull ensured.Attempted to slack off and the string took weight. Back reamed the stand and racked it back. Picked up a drill pipe single and attempted to pull(no go). Work pumps in stages from 4 spm/300 psi =no returns to 79 spm/1120 psi =30%flow. Engaged the rotary at 30 rpm and lost returns again. Pick up to 9722' and stage up the up the pumps from 3 spm/310 psi = no flow to 160 spm/3380 psi =42%flow. Engaged the rotary and reamed the stand at 100 rpm. Circulate and clean the hole and pump a nut plug sweep and chase it out. Swab gas was 105 units at 9775'. Drill formation to midnight. 4/6/10 Drill formation to 10948' and pump a nut plug sweep at 10319', 10602', and 10882'. Rig up to back ream out of the hole. Back ream from 10948'to 9281'. Run back in the hole on the elevators and circulate the last stand down. Wiper gas was 135 units. Back ream out of the hole from 10945'to 8613'with a maximum gas reaming out of the hole of 56 units. 4/7/10 Back ream from 8613'to 4256' and circulate bottoms up. The maximum gas while pulling out of the hole was 55 units. Clean the rig floor and cut and slip new drill line and inspect the top drive. Work on the top drive and run in the hole with the bit from 4297'to 10692'. Circulate every 2000'and bypass the gas trap to the old pits. Ream down and dump the old mud to set up for a fluid transfer swap. Line up the new pit module and swap out the mud system. 4/8/10 Finish the displacement of the mud system (bypassing the gas trap)wiper gas was not recorded. Drill formation from 10947'to 11770'. Pump a high viscosity sweep and work on mud pump#1. Drill formation to 12772' and pump a nut plug sweep and circulate the hole. 4/9/10 Back ream out of the hole from 12772'to 10947'. Monitor the well for 5 minutes and run in the hole from 10947'to 12772' and drill formation. 4/10/10 Drill formation to 14074' and change out#2 mud pump high psi mud hose. Circulate the hole and back ream out from 14074'to 12772'and monitor the well. Run in the hole from 12772'to 14008'and circulate the well. Wiper gas was 67 units. Change out the shock hose and test the hose. Bring up the mud pumps and notice a psi loss. Flow check the well=slight flow. Check the flow again and the well is dead. Pull out of the hole from 14008'to 10131' at midnight. 4/11/10 Pull out of the hole from 10131'to 4067'. Check for flow/static. Change out the 5"drill pipe elevators and lay down the drill pipe from 4067'to 665'. Stand back the HWDP and lay down two HWDP. Lay down the top half of the combo jar length with 301'of BHA still left in the hole. Clean and clear the rig floor and rig up to test the BOPE. Test the BOPE and rig down the test equipment. Make up the fishing BHA and run in the hole and pick up drill pipe from 367'to 3487'with zero mud losses the last 24 hours. 4/12/10 Pick up drill pipe from the pipe shed from 3487'to 3863'and run in the hole from the derrick from 3863'to 4242'. Cut and slip new drill line and circulate at 212 gpm (bypassing the gas trap). Run in the hole to 12265'and wash down to 13616'. Run in the whole and tag the fish at 13776'.Work over the fish and pull 20k overpull. Circulate bottoms up with trip gas of 117 units. Pump out five stands and pull out to 3848'. Flow Check the well/static. Pull out of the hole to 3881' and lay down the drill pipe from 3581'to 1784'. 5 CANRIG ConocoPPhillips Alaska,Inc. 2L-304 4/13/10 Lay down the drill pipe from 1784'to 367'. Stand back the HWDP (did not recover the fish)and clean the rig floor. Make up the over shot#2 and pick up drill pipe and run in the hole from 367'to 4297'. Monitor the well five minutes and run in the hole to 13777'and tag the fish. Work over the fish and latch onto it. Pump slowly at 11 BPM. Trip gas was 125 units. Work through a tight hole from 13333'to 13137'. Fish fell off the over shot at this point. Run in the hole and tag the fish at 13773'and attempt to latch onto the fish. The grapple is not biting onto the fish. Monitor the well and pump a dry job and pull out of the hole from 13712'to 5284'without the fish. 4/14/10 Pull out of the hole from 5289'to 3394'and monitor the well. Lay down the drill pipe from 3394'to 369'. Stand back the HWDP and break off the over shot. Clean the rig floor and make up over shot#3. Pick up the drill pipe from 369'to 3394'and monitor the well. Run in the hole and work over the fish at 13776'. Make several attempts to set the grapple. The grapple is slipping off the fish. Circulate and condition the hole with trip gas of 84 units. Pump a dry job and pull out of the hole to 3205' and lay down drill pipe to 557'. 4/15/10 Continue to lay down drill pipe from 557'to 3689'and monitor the well for five minutes. Stand back the HWDP and break off the overshot and grapple. Make up over shot#4 and pick up drill pipe from 375'to 3211'. Run in the hole to 4250' and slip and cut new drill line and service the top drive. Run in the hole to 13776'and engage the fish and pump out slowly. Trip gas was 68 units. Pump out of the hole with the fish to 11534'. Pull out of the hole to the shoe. Monitor the well and pull out of the hole to 3392'. Pull out and lay down drill pipe to 369'with no mud losses in the last 24 hours. 4/16/10 Lay down the fish and make up a new BHA and bit#4. Run in the hole to bottom. The hole is in good condition.Wash down the last stand with trip gas of 65 units. Drill formation to midnight. 4/17/10 Drill formation to 14340'/5686'TVD and circulate bottoms up 1.5 times. Back ream out of the hole and run a mad pass from 14200'to 13800'. Pump out of the hole to 4256'with a maximum gas reading of 25 units. Circulate bottoms up with a max gas of 26 units. 4/18/10 Pull out of the hole and lay down the drill pipe from 4256'to 854'. Lay down the circulating sub, HWDP, collars and pull the nuke sources. Down load the MWD and lay down the BHA. Clean and clear the rig floor. Cut and slip new drill line. Change out the pipe rams to 7 5/8"and test the same. Rig up to run casing. Start to run casing and run to 3097'at midnight. 6 CANRIG ConocoPhillips Alaska.Inc 2L-304 3 GEOLOGICAL DATA 3.1 Lithostratiqraphy All tops provided by ConocoPhillips Operations Geologist. Markers,To s and Faults MD TVD TVDSS MD TVD TVDSS +/-to Top/Marker prognosis prog prog actual actual actual Prognosis Comment _Kick Off Point 325' 324' -184' 351' 350.83' -210' -24 Deep 10 3/4"Casing Shoe 4,300' 2,407' -2,267' 4,297' 2,399' -2,260 -8 shallow 9 7/8" Intermediate Borehole: C80 (K10) 4,613' 2,500' -2,360' 4,700' 2,506' -2,367' 6' deep Camp Sand (Top) 4,829' 2,564' -2,424' 4,996' 2,572' -2,433' 8' deep C50 9,181' 3,855' -3,715' 9,372' 3,910' -3,771' 55' deep C40 10,648' 4,290' -4,150' 10,701' 4,304' -4,165' 14' deep C37 11,103' 4,425' -4,285' 11,210' 4,456' -4,317' 31' deep S8-Top Resevoir 13,844' 5,400' -5,260' 13,855' 5,402' 5,263' 3' deep T1.5- Base Resevoir 14,062' 5,526' -5,386' 14,109' 5,547' 5,408' 22' deep C35 14,133' 5,570' -5,430' 14,200' 5,416' 5,463' 33' deep TD 14,265' 5,656' -5,516' 14,340' 5,687' 5,548' 7 CANRIG Conoc Phillips Alaska.Inc. 2L-304 3.2 Mudlog Summary Surface to top of C-80 (0' MD to 4700' MD) Drill Rate(ft/hr) Total Gas(units Maximum Minimum Average Maximum Minimum Average 892.1 8.8 125.0 2778 0 387.1 This interval is made up predominantly of interbedded clays, claystones sand, and conglomerates with alternating proportions of each. There was one minor oil show from 3500'to 3750'. The clays and claystones in this section are comprised of pinkish gray to very light gray, very poor to poorly indurated; lumpy to clumpy; clustered to clotted; mushy to pasty; various consistency and tenacity; tacky to slimy; non to slight cohesive; slight to moderate adhesiveness; amorphous fracture; massive habit; earthy luster; colloidal to clayey texture; massive gradational clays to being interbedded with sands; composed of >90%clay with minor silt. The sands and conglomerates in this section consist of greenish gray to light greenish gray; grains are lower coarse to upper medium in size; sphericity is moderate to low; rounding at the beginning of the interval is angular to sub-angular but moves to sub-angular to sub-rounded as the interval progresses; moderately well to well sorted; unconsolidated sand; cement is indeterminate; matrix is quartz with chert and green lithics; grain supported; texturally the sand is immature but grows in maturity as the interval progresses; compositionally the sand is immature; no other accessory minerals or features noted; porosity and permeability are visually estimated to be good; no fluorescence or other oil indicators noted. Conglomerates are composed of various dark grains; salt and pepper; predominantly sub round; scattered sub angular bit impacted fragments;moderate to well developed sphericity;moderate sorting in coarse grains to poor overall with matrix sands; polished to chipped textures; immature nature; abundant silt and sand matrix; hydrophilic; poor porosity and permeability; overall detritalish with silts, clays and carbon fines; composed of quartz,chert,green stone,jasper,argillite,volcanics and various lithic fragments;no show of oil indicators. Minor oil show between 3500'and 3750'was gray to light gray in color;grains upper medium to lower coarse predominate, range from very coarse to fine; sphericity is moderate to low; rounding is sub angular to sub rounded; sorting is poor to moderate; sand is unconsolidated; cement is missing; sand is grain supported; texturally the sand is immature;compositionally the sand is immature;quartz is the predominate mineral,sand also contains chert and green lithics;approximately 20%clay; no other accessories or features;porosity and permeability is visually estimated to be good; no staining;slight oil odor at close range;fluorescence is bright yellow 50% of undisturbed grains, 100% of disturbed grains; cut is a blooming to streaming bluish white; residual cut is a dull yellow;overall sample displays a rainbow sheen in white light;faint straw residual cut;no free oil at shakers. Several strong gas peaks were recorded and sampled in this interval. These are likely attributed to organics and methane hydrates above the base of the permafrost. Peaks Depth TG C1 C2 C3 C41 C4N C51 C5N 1952' 2778 484748 0 0 0 0 0 0 8 CANRIG Conoc Phillips Alaska.Inc. 2L-304 C-80 to top of Campanian sand (4700'to 4996' MD) Drill Rate(ft/hr) Total Gas(units Maximum Minimum Average Maximum Minimum Average 369.3 47.5 161.5 51 3 17.9 The C-80 to the top of the Campanian sand is characterized by siltstone and sand. Sand is very light gray to light gray with yellowish brown hues; clast size ranges from medium upper to very fine grain grading to silt; moderately developed sphericity; very poor sorting grading to silt; polish to pitted to chip to impacted textures; immature to sub mature nature in a gradational bedding; no visible cement; unconsolidated and heavily interbedded with silt, ash and clay; dominant matrix support; all matrix hydrophilic and loosely attached; poor porosity and permeability; no show of oil indicators. Siltstone is characterized as pinkish gray; very poor to poorly indurated; brittle; clustered to clotted; mushy to pasty; non to very slight cohesiveness; moderate adhesive; amorphous fracture; massive habit; earthy luster; silty to colloidal texture; massive gradational beds of sand, silt and clay; interbedded very fine grain to fine grain sand; slight devitrified ash blebs scattered throughout the zone; some volcanic clastic relic shards in the silt matrix; all very hydrophilic with 40% going into the mud system. Peaks Depth TG C1 C2 C3 C4I C4N C51 C5N 4837 51 9405 89 0 0 0 0 0 Campanian sand to top of C50(4996'to 9372' MD) Drill Rate(ft/hr) Total Gas(units Maximum Minimum Average Maximum Minimum Average 1316.8 10.3 150.2 69 0 18.3 From the top of the Campanian sand to the top of the C-50 is comprised of claystones, siltstones, and silty sandstones. The claystones in this formation consist of color is brown, brownish gray hues; soft while wet with tacky gooish nature;tenacity ranges from tough and dense before a thorough washing; poorly inundated; fracture is amorphous; cuttings habit is massive; luster is dull with earthy tones; clay to silty texture; no specific structure noted, although packs to massive bunch; poor sorted with grains ranging from very fine to clay sized; large grains are subangular to subrounded, with subrounded to rounded matrix of silty and clays. Silts are colorful including reds(possibly Garnets), greens(possibly.Andesite, apatite, etc.) and blacks(biotite, mica et.Al) no other accessories noted in sample; no oil indicators noted. Siltstones in this section are light brownish gray to light yellowish gray and various hues of both; very poor to poorly indurated and becoming poor to moderately indurated with depth in parts composed of various consistencies and tenacities with depth; overall gummy to stiff; sub earthy to amorphous fracture; massive to sub nodular habit; earthy luster; clayey and colloidal to silty and gritty textures; massive gradational beds of siltstone with decreasing very fine grained sandstones all grading to siltstone; composed of 80% silt, 20% clay and various detrital material; micro laminations of white to very light very fine grained gray sandstone. Silty sandstones are gray to light gray in color; grains are upper to lower fine grading into silt at times; sphericity is moderate to poor; rounding is moderately to poor;well to very well sorted;friable to very poorly consolidated; cement is indeterminate; matrix is siliceous; sandstone is grain supported; sandstone 9 CANRIG ConocoPhillips Alaska.Inc. 2L-304 is texturally sub-mature; sandstone is compositionally sub-mature; quartz is the predominate mineral; also present is brownish, black carbonaceous material which appears in very thin laminations; porosity and permeability are visually estimated to be very poor to tight; no oil indicators were noted. Gas is generally low and associated with sandy sections of the interval. Peaks Depth TG C1 C2 C3 C41 C4N C51 C5N 6294 69 12711 110 0 0 0 0 0 C50 to top of C40 (9,372"to 10,701' MD) Drill Rate(ft/hr) Total Gas(units Maximum Minimum Average Maximum Minimum Average 253.2 32.5 131.8 84 5 23.4 This interval between these two markers in the Seabee formation is siltstone. The siltstone is light gray; poor to moderate induration; brittle to stiff; crumbly to crunchy; slightly cohesive; non adhesive; earthy fracture; sub nodular habit; earthy luster; silty to gritty to abrasive texture; massive homogeneous beds of silt; composed of >90%friable silt and trace various detritus material; trace carbonaceous micro laminations;trace very fine grained;trace carbonaceous and trace devitrified ash. Gas is generally low. Peaks Depth TG C1 C2 C3 C41 C4N C51 C5N 10603 84 15276 556 133 23 17 0 0 C40 to C37 (10,701'to 11,210' MD) Drill Rate(ft/hr) Total Gas(units Maximum Minimum Average Maximum Minimum Average 243.8 24.5 111.2 75 9 33.3 This interval is comprised predominantly of carbonaceous siltstone. Carbonaceous siltstone is mottled light brown to dark brown interbedded with siltstone; brittle; non to slightly cohesive; non adhesive; planar fracture along carbon partings; paper habit; greasy luster; silty texture; massive heterogeneous beds of very carbonaceous silt mottled with clean silt; occurs as micro laminations; decrease of unconsolidated sand with depth. Gas is generally low. Peaks Depth TG C1 C2 C3 C41 C4N C51 C5N 10703 75 14921 542 238 31 16 0 38659 10 CANRIG ConocoPhillips Alaska.Inc. 2L-304 C37 to S8—Top Reservoir(11,210'to 13,819' MD) Drill Rate(ft/hr) Total Gas(units Maximum Minimum Average Maximum Minimum Average 812.8 26.0 135.0 198 5 29.1 This interval is comprised of siltstones, carbonaceous siltstone and sand/sandstone At the beginning of the interval the siltstone is dark gray to medium dark gray in color; poorly to very poorly indurated; brittle to dense tenacity; earthy fracture; massive to sub-nodular cuttings habit; earthy to dull luster; silty to gritty texture; massive structure with carbonaceous laminations; some pyrite and very fine to fine grained sand; no oil. At the end of the interval the siltstone grades to light gray to very light gray some grading to light grayish brown; brittle; crumby to crunchy; non to slightly cohesive; non adhesive; earthy fracture; sub nodular habit; earthy luster; silty texture; massive gradational beds of siltstone with thin beds of very fine grain sandstone; silt is composed of 90%silt with 10%carbon fines and various detritus material;trace aggregate pyrite; continued 10%faint light green sample fluorescence with no oil cuts. The carbonaceous siltstone is very dark greenish gray to dark greenish gray with light brown sub-hues; poorly to moderately poorly indurated; tenacity is brittle to crumbly;fracture is irregular to earthy; cuttings habit is massive; luster is dull to earthy;texture is silty to gritty; structure is massive with carbonaceous material distributed with out any discernable pattern; carbonaceous material composes between 5% and 10%of the siltstone, it is light brown to brown in color; overall sample fluoresces a dull yellow, no odor, no staining, specific cuttings (1%)fluoresce bright yellow with a streaming, bluish white cut, no staining The sand/sandstone samples appear very light gray; clast size ranges from medium lower to very fine upper; sub round; moderate developed sphericity; poor to some moderate local sorting; chip to impact to polish textures; sub mature nature; unconsolidated to some slightly consolidated clusters; non to very weak silic cement; slightly scattered silt matrix in sandstone; overall appears arenaceous; composed of >90% quartz with trace various lithic fragments; distinct aggregate pyrite; fair to good porosity and permeability; very faint dull light green sample fluorescence with no oil cuts. Gas is generally low but increases as depth in increases. Peaks Depth TG C1 C2 C3 C41 C4N C51 C5N 12288 198 1441 118 46 9 20 0 0 S8—Top Reservoir to T1.5—Base Reservoir(1.3,844'to 14,062') MD) Drill Rate(ft/hr) Total Gas(units Maximum Minimum Average Maximum Minimum Average 95 16.9 44.8 275 8 74.9 This is the target reservoir sandstone. The sandstone very light gray; clast size very fine upper to very fine lower some fine lower; sub round; moderate to well developed sphericity; poor to moderate sorting; polish texture sub mature to mature nature with depth; appears tight with moderate secondary enlargement overgrowths; slight visible clay/tuff matrix; dominant grain support fair visible porosity+ permeability composed of analcite and minor quartz 70%to 80% even moderate to semi bright light green sample fluorescence; no stain; no odor; slow to moderate streaming cut; instant light yellow blue hazy sample fluorescence with slow increase to 11 CANRIG ConocoPPhillips Alaska.Inc. 2L-304 moderate hazy light blue white milky cut;very faint straw residue stain. Peaks Depth TG C1 C2 C3 C41 C4N C51 C5N 13963' 275 32214 4759 2909 1401 5165 T1.5—Base Reservoir to Top of C35(14,062'to 14,133' MD) Drill Rate(ft/hr) Total Gas(units Maximum Minimum Average Maximum Minimum Average 59.8 28.1 41.8 92 9 32 This interval consists of carbonaceous siltstone which is light grayish brown mottled light to dark brown; very poorly indurated; crumbly; slightly cohesive; non adhesive sub planar fracture; sub platy habit; earthy with mottled greasy luster; silty texture; massive carbonaceous silt with micro laminations of carbonaceous material with distinct planar orientation; composed of 50% silt, 50%carbonaceous material. Gas is generally low. Peaks Depth TG C1 C2 C3 C41 C4N C51 C5N 14098 92 9460 2478 1279 561 225 C35 to TD(14133'to 14340' MD) Drill Rate(ft/hr) Total Gas(units Maximum _ Minimum Average Maximum Minimum Average 70.8 13.4 44.1 52 5 20 This interval consists of carbonaceous siltstone which is light grayish brown mottled light to dark brown; very poorly indurated; crumbly; slightly cohesive; non adhesive sub planar fracture; sub platy habit; earthy with mottled greasy luster; silty texture; massive carbonaceous silt with micro laminations of carbonaceous material with distinct planar orientation; composed of 50%silt, 50% carbonaceous material. Gas is generally low. Peaks Depth TG C1 C2 C3 C41 C4N C51 C5N 14241 52 4993 1371 685 223 70 12 CANRIG ConocoPhillips Alaska.Inc. 2L-304 3.3 Connection Gases 1 unit=0.05%Methane Equivalent Depth Gas over BGG (feet) (units) 1395' 1313 1580' 646 1675' 595 1770' 246 2145' 73 2240' 36 3460' 65 3645' 17 3740' 77 3835' 80 4220' 70 9922' 65 11070' 20 11450' 6 12018' 6 12110' 10 13058' 21 13150' 9 13238' 130 13532' 130 13909' 50 14009' 60 14095' 30 13 CAN RIG ConocoPhillips Alaska.Inc. 2L-304 3.4 Trip(Wiper)Gases 1 unit=0.02%Methane Equivalent Depth Trip to Gas Downtime (feet) (feet) (units) (hours) 4330'WIPER 305 4330'TRIP SURFACE 275 6403'TRIP SURFACE 9 10948'WIPER 4297' 135 12772'WIPER 4297' 33 14074'TRIP SURFACE 117 FISHING 14074'TRIP SURFACE 125 FISHING 14074'TRIP SURFACE 84 FISHING 14074'TRIP SURFACE 68 FISHING 14074'TRIP SURFACE 65 FISHING/DRILL OUT 14 CANRIG ConocoPhillips Alaska.Inc. 2L-304 3.5 Sampling Program /Sample Dispatch Set Type/Purpose Frequency Interval Dispatched to Washed, screened, 50' 200'— 13,770' CPAI,ABV 100 and dried reference 14,200'—14,340' Bayview Warehouse A samples 619 E.Ship Creek Ave. Anchorage,AK 99501 Attn:D.Przywojski/M.McCracken Set owner: CPAI 10' 13,770'—14,200' (907)263-4859 Washed, screened, 200'— 13,770' CPAI,ABV 100 and dried reference 50' 14,200'—14,340' Bayview Warehouse B samples 619 E.Ship Creek Ave. Anchorage,AK 99501 10' 13,770'— 14,200' Attn:D.Przywojski/M.McCracken Set owner: CPAI (907)263-4859 500' 500'— 13700' Gas Isotubes IsoTech Laboratories,Inc. C ConocoPhilips Contact=Albert Holba 1308 Parkland Court Set owner: CPAI 30' 13,700'— 14,150 Champaign,IL 61821 Sample frequency was locally altered according to drill rate constraints and zones of interest. 15 CANRIG ConocoPhillips Alaska,Inc. 2L-304 3.6 Isotube Gas Samples Box/ Depth TG Cl C2 C3 C4I C4N C5I C5N Sample (MD/TVD) (units) (ppm) (ppm) (ppm) (ppm) (ppm) (ppm) (ppm) 1-1 600'/598' 1 124 1-2 1000'/983' 11 3470 1-3 1400'/1324' 2370 442760 1-4 1500'/1400' 530 76897 1-5 2000'/1707' 150 30317 1-6 2035'/1734' 1087 201248 tr 1-7 2328'/1824' 1241 263216 tr 1-8 2392'/1843' 2100 308925 tr 1-9 2500'/1875' 600 135592 1-10 3007'/2011' 1312 303225 tr 1-11 3494'/2165' 1550 376476 518 38 1-12 4000'/2311' 249 45625 94 1-13 4494'/2455' 9 3303 22 1-14 5000'/2572' 8 3154 28 1-15 5499'/2712' 21 7112 43 1-16 5994'/2864' 41 8868 59 1-17 6495'/3016' 28 5253 28 1-18 7000'/3189' 9 2594 29 1-19 7500'/3345' 14 2652 21 1-20 8001'/3496' 12 2283 21 1-21 8500'/3647' 13 3449 36 1-22 9000'/3797' 27 5828 70 1-23 9500'/3947' 12 3156 51 1-24 10000'/4094 20 3898 71 16 CANRIG ConocoPPhillips Alaska.Inc. 2L-304 1-25 10500;/4243 35 6819 188 37 2-1 11000'/4394 27 4819 139 35 2-2 11500'/4540 22 4008 195 61 1 17 2-3 11640;/4581 160 31277 1039 292 27 52 2 4 11679;/4592 198 37356 1173 316 33 56 2-5 11801'/4629 56 11264 382 119 13 32 2-6 12000'/4688 18 3481 150 66 12 19 2-7 12500;/4838 16 2905 76 41 1 9 2-8 13000;/4993 26 5908 251 89 14 35 2-9 13500'/5213 32 5356 3330 130 8 32 5 1 2-10 13700'/5316 40 5008 523 243 31 83 17 31 2-11 13730'/5332 68 9558 967 387 42 116 30 37 2-12 13760;/5349 35 4548 540 243 29 84 8 11 2-13 13790'/5365 19 2473 283 128 18 38 1 4 2-14 13820'/5382 26 3820 331 174 25 69 4 13 2-15 13850,/5399 66 9940 709 267 30 79 13 25 2-16 13880;/5415 32 5059 392 136 27 73 10 25 2-17 13910'/5432 51 6961 1067 635 55 194 47 59 2-18 13940;/5449 163 16666 2964 1601 178 489 121 139 2-19 13963'/5462 230 30001 4031 2370 271 762 167 175 2 20 14000,/5483 93 8774 1608 938 113 321 71 93 2-21 14030'/5500 174 29430 3178 1836 221 637 65 118 2-22 14060'/5518 80 14000 1404 937 138 391 92 125 2-23 14100'/5541 21 1775 587 338 39 102 22 29 2-24 14120;/5553 11 808 278 184 37 73 14 4 2-25 14150'/5571 7 711 142 60 14 29 3 11 17 CANRIG Co -a, E • 0 0 'Es' a Ts o 2 2 2 2 0 H 0 0 �.a) c (j0 (j000000 0 0 0 0 c) 0 I 0 I 0 1 U 2 m 000 0 0 0 N > H :C y > 5 (7 C7 C7 m m U) > m m m m 22 L o- o 2 -0 -0 z z z z ce ce Et cc z n @ .o W W w W - -OO w w E a i I- w w > > z zz 0 w CO M .w.. ac a) a) as'a to a) L X O) C>O C CO � r CO CO CO N- N- a) 0 n a; ai rn rn n rn oi y U CL c W N Na LE a) 6 • .. a a M 0 C CA co r-- r- N- co CO N- r-- N c c ,_ o a i Q Cn ai ai ai of a) ai rn ai II -5 2 c c c_ jf° • aS O y N N b in O in b CD O io c IL)U Q0 o g M N ,- CO CO CO v co y w- N > ... N N M I I Cn Cn a o N i i i C N a,CP- CD Q CO co c L a) O !I �* O N H .0 H 0 O CD 0 0) N 0 N ON- I rn • -o > 4- Lo Lo CO CV Tr CD Cn co -o cc V J c i_ (0 ~ N CV C') Nt V' Cn 14) Cn Cn u) ii. g N 0 � - a) ai 8-- N L M = C6 ZT Cy f� L • O ce e r N CO - CO 0 r (+) II Q N Ts Z C 0 CD 00 0 ,- 0 L I- 0r5 cji 0 r O o O CC 3 co O • a) iii I-• EL) L- >9 0 0 0 0 0 c 0 0 N.. ca 0) 0 1J.I ° O O 0 O O (7 0) a) 0 c 'C 0 ... CD C Dv M 4 C) M m LL m 0 6 H 0 ( H H 0 H H 1/43 V. d I— a) o 0 W J 0 Cn m m Cn m m Cn co Cl) .c a) O 0) C L_ ITS co O▪ N E c.c3 N O H D J o H 0 u) (/) u) CA co , O 0 \° O \° \ 'O Q y y w d. E Oo H 0 °O H m0 I 0 °0 I— mpm °0 CO • cm— "a a) •E C �' � Z �n 2 0_ CD 0 Z a) m < m re •` A a o a � L7 � _, U m 0) J 0 0 t6 O 2oS a m 0 LL a C1 O C E2',- c .- as 01 ; c c 0 co W H a i oo :i ce o w d ° E om c = o (a o U)) 0 n ca a) o Y 4- o m H = m o co o 0 o r-- H o in O Tr 0 U CO O ...0 M Cb . V) 0 Z 0 I- 0 0 0 U) H 0 H o \ 13 7 7 0 is = • -c k � \ / -� @ a e 2 \ ca $ 0 ± \ � � ( k ) a . ° - Eo § 22 % U) & -0 cal ® ca o ° _ % ° $ V O e o vi ° \ � ( CO _ k BCD E. 5 6- > -2 - us ° w > \ � f2 D V CO i as c = o = £ O ± ® CM 2 2a : 2Ej kk ojk _ « EC Eo ® k % 4 c5 ,_ 5 : \y ' _ % fg § 32 f ( E _ CU a " \ � � � S § 7 @E � A' R / CO 2 ° ° S �� t Eby \ k Wk > Qa) a0 = >, � c I0_ § 2c .o @ G 22 # � § k 2E \ k . 2 � � � \ C0 + / \ 0 o CL co D 2 a \\ k jc $ Co$ V0 E - H 20 / » % � 00 or _ 2 § S � (Ow k 2 § 2 o o m a m C 4 M @I � K $ k �ƒ a) a) o / P \ I \ o � E E k I �� 7j 0 cfg C CU $ E a [ , -0 _ # � § 2 % \ / 0 \ k $ E o c ) \ � o \ , o, act a 2 82e a.k � \ oW ƒ § E � j k § - 3 \ a E0 'a20- @ > / kk e e e co t a) E E / / k J § H .- ConocoPPhillips Alaska.Inc. 2L-304 5 DRILLING DATA 5.1 Survey Data Measured Incl. Azim. True N(+)/S(-) E(+)/W(-) Vertical Dogleg Depth ° ° Vertical Section Rate (ft) ( ) ( ) Depth (ft) (ft) (ft) (ft) (°/100ft) 24.45 0.00 0.00 24.45 0.00 0.00 0.00 0.00 76.00 0.23 122.37 76.00 -0.06 0.09 0.09 0.45 171.00 0.18 248.70 171.00 -0.21 0.11 0.14 0.39 261.00 1.23 102.65 260.99 -0.47 0.92 0.97 1.54 351.00 5.33 95.74 350.83 -1.10 6.02 6.12 4.57 438.00 5.85 94.47 437.41 -1.85 14.46 14.58 0.61 533.00 6.57 95.40 531.85 -2.74 24.70 24.85 0.77 629.00 7.60 96.65 627.12 -4.00 36.48 36.69 1.08 725.00 9.24 97.76 722.08 -5.77 50.42 50.74 1.72 818.00 15.75 99.84 812.83 -8.94 70.28 70.84 7.02 869.38 19.59 97.49 861.78 -11.26 85.69 86.43 7.60 910.00 21.58 98.76 899.80 -13.28 99.83 100.71 5.02 961.28 22.70 95.50 947.30 -15.67 119.00 120.03 3.24 1056.82 25.78 91.86 1034.41 -18.11 158.13 159.14 3.58 1153.00 28.59 91.45 1119.96 -19.37 202.04 202.85 2.93 1247.62 30.53 95.39 1202.27 -22.20 248.61 249.40 2.90 1340.76 38.06 98.28 1279.17 -28.57 300.65 301.82 8.27 I 1389.03 40.41 97.96 1316.55 -32.88 330.88 332.35 4.89 1439.06 40.81 98.20 1354.53 -37.45 363.12 364.91 0.86 1532.50 43.70 94.72 1423.70 -44.47 425.53 427.71 3.98 1627.38 46.98 93.24 1490.38 -49.13 492.84 495.06 3.63 1 1718.44 50.46 92.80 1550.45 -52.72 561.17 563.28 3.84 1813.17 53.78 93.01 1608.60 -56.52 635.83 637.81 3.51 1908.16 58.62 92.06 1661.43 -59.99 714.67 716.43 5.16 1953.62 60.38 92.15 1684.50 -61.43 753.81 755.43 3.88 2002.47 62.61 93.57 1707.82 -63.57 796.68 798.22 5.23 2096.26 67.15 94.16 1747.62 -69.30 881.38 882.95 4.87 2190.78 70.15 95.49 1782.03 -76.72 969.09 970.88 3.43 2283.76 72.83 96.80 1811.55 -86.16 1056.74 1059.02 3.18 2378.19 71.87 97.39 1840.18 -97.28 1146.04 1149.00 1.18 2470.46 74.32 97.81 1867.01 -108.95 1233.54 1237.28 2.69 2565.24 75.95 97.94 1891.32 -121.51 1324.28 1328.88 1.72 2661.77 74.23 97.95 1916.16 -134.40 1416.66 1422.15 1.78 1 2755.36 74.68 97.09 1941.24 -146.20 1506.05 1512.32 1.01 2850.95 74.08 96.80 1966.98 -157.33 1597.43 1604.37 0.69 20 CANRIG IV ConocoPhillips Alaska.Inc. 2L-304 2944.98 72.86 96.70 1993.73 -167.92 1686.95 1694.51 1.30 3038.58 71.82 96.82 2022.12 -178.42 1775.52 1783.69 1.12 3129.64 71.26 96.54 2050.96 -188.47 1861.30 1870.06 0.68 3227.09 70.82 97.14 2082.62 -199.45 1952.81 1962.22 0.74 3322.65 71.52 97.15 2113.46 -210.70 2042.55 2052.66 0.73 3416.20 72.39 97.12 2142.44 -221.74 2130.81 2141.61 0.93 3509.96 71.83 98.14 2171.24 -233.59 2219.25 2230.83 1.20 3604.15 72.23 98.65 2200.30 -246.67 2307.88 2320.41 0.67 3697.87 73.61 98.80 2227.83 -260.26 2396.43 2409.97 1.48 3793.51 74.27 98.78 2254.29 -274.31 2487.26 2501.85 0.69 3888.79 74.02 99.12 2280.32 -288.56 2577.80 2593.48 0.43 3984.07 73.09 99.65 2307.29 -303.46 2667.95 2684.80 1.11 4078.81 72.63 99.58 2335.21 -318.59 2757.21 2775.27 0.49 4173.19 73.25 98.98 2362.90 -333.14 2846.26 2865.45 0.89 4258.71 72.98 98.38 2387.74 -345.49 2927.16 2947.26 0.74 4320.43 72.76 96.44 2405.92 -353.09 2985.64 3006.24 3.02 4374.77 73.01 98.25 2421.91 -359.73 3037.15 3058.17 3.22 4474.40 74.07 96.71 2450.14 -372.17 3131.88 3153.71 1.82 4570.13 75.31 96.38 2475.42 -382.69 3223.60 3246.03 1.34 4661.88 76.56 95.80 2497.72 -392.13 3312.10 3335.01 1.49 4753.01 77.19 95.19 2518.41 -400.63 3400.44 3423.70 0.95 4850.26 77.81 93.90 2539.46 -408.15 3495.08 3518.53 1.44 4944.70 76.58 92.75 2560.39 -413.49 3587.02 3610.38 1.76 5040.65 75.19 92.86 2583.79 -418.05 3679.96 3703.13 1.45 5137.90 74.19 92.60 2609.47 -422.52 3773.65 3796.61 1.06 5228.22 73.64 91.78 2634.49 -425.83 3860.37 3883.03 1.06 5326.39 73.17 91.58 2662.53 -428.59 3954.41 3976.64 0.52 5419.57 72.98 91.93 2689.66 -431.32 4043.51 4065.35 0.41 5513.62 72.19 92.56 2717.80 -434.84 4133.18 4154.72 1.06 5604.15 72.74 92.46 2745.08 -438.62 4219.42 4240.73 0.62 5701.70 72.27 91.82 2774.41 -442.09 4312.39 4333.37 0.79 5792.90 72.02 92.25 2802.37 -445.17 4399.14 4419.79 0.53 5888.37 71.70 92.32 2832.09 -448.79 4489.80 4510.16 0.34 5979.93 71.96 91.89 2860.64 -451.99 4576.73 4596.78 0.53 6072.57 73.49 92.75 2888.15 -455.57 4665.12 4684.88 1.87 6169.91 73.26 91.94 2916.00 -459.39 4758.31 4777.79 0.83 6262.60 72.46 89.83 2943.32 -460.76 4846.86 4865.78 2.34 6358.80 71.41 89.66 2973.15 -460.35 4938.32 4956.42 1.10 6399.96 71.79 90.19 2986.15 -460.30 4977.37 4995.14 1.53 6500.90 70.75 90.00 3018.56 -460.46 5072.97 5089.95 1.05 6593.76 69.89 89.75 3049.83 -460.27 5160.40 5176.63 0.96 21 CANRIG ConocoPhillips Alaska.Inc. 2L-304 6690.80 69.55 90.10 3083.46 -460.15 5251.43 5266.88 0.49 6783.42 69.44 89.96 3115.91 -460.19 5338.18 5352.91 0.18 6879.90 69.81 90.11 3149.50 -460.25 5428.62 5442.60 0.41 6974.69 70.35 90.69 3181.79 -460.87 5517.74 5531.05 0.81 7069.58 71.19 91.36 3213.05 -462.48 5607.32 5620.09 1.11 7162.75 71.54 91.15 3242.82 -464.41 5695.58 5707.86 0.43 7259.45 72.10 91.67 3272.99 -466.67 5787.43 5799.23 0.77 7356.10 72.69 92.23 3302.22 -469.81 5879.49 5890.93 0.82 7446.20 72.70 92.97 3329.02 -473.71 5965.43 5976.65 0.78 7544.53 72.56 93.04 3358.38 -478.63 6059.14 6070.22 0.16 7641.08 72.24 92.66 3387.57 -483.21 6151.06 6161.95 0.50 7735.87 72.29 93.48 3416.45 -488.04 6241.21 6251.98 0.83 7830.62 72.42 93.65 3445.17 -493.66 6331.33 6342.07 0.22 7927.39 72.35 94.07 3474.45 -499.86 6423.36 6434.12 0.42 8021.15 71.98 93.76 3503.17 -505.96 6512.40 6523.21 0.50 8116.59 72.18 94.34 3532.53 -512.37 6602.98 6613.86 0.62 8211.34 72.22 94.29 3561.50 -519.16 6692.94 6703.94 0.07 8301.55 72.75 94.86 3588.65 -526.02 6778.70 6789.86 0.84 8398.08 72.81 95.38 3617.23 -534.25 6870.53 6881.99 0.52 8493.50 72.62 95.48 3645.58 -542.87 6961.23 6973.05 0.22 8588.04 72.49 95.23 3673.92 -551.29 7051.03 7063.18 0.29 8678.97 72.30 95.33 3701.42 -559.27 7137.33 7149.79 0.23 8778.56 72.62 94.55 3731.44 -567.44 7231.94 7244.66 0.81 8869.74 72.49 94.23 3758.77 -574.10 7318.67 7331.52 0.36 8964.01 72.63 94.31 3787.02 -580.80 7408.36 7421.33 0.17 9063.66 72.44 94.22 3816.93 -587.87 7503.15 7516.24 0.21 9154.85 72.44 94.50 3844.44 -594.48 7589.84 7603.05 0.29 9247.85 72.63 94.46 3872.35 -601.41 7678.28 7691.65 0.21 9342.66 72.49 94.49 3900.77 -608.46 7768.46 7781.98 0.15 9437.96 72.51 94.47 3929.43 -615.56 7859.07 7872.75 0.03 9532.41 72.38 94.48 3957.91 -622.59 7948.84 7962.68 0.14 9626.66 72.63 94.84 3986.25 -629.89 8038.44 8052.47 0.45 9717.42 72.90 94.75 4013.14 -637.14 8124.82 8139.06 0.31 9815.61 73.13 94.76 4041.82 -644.92 8218.40 8232.87 0.23 9904.58 73.27 94.59 4067.54 -651.87 8303.29 8317.94 0.24 10001.95 72.25 94.22 4096.40 -659.01 8396.01 8410.81 1.11 10100.01 72.29 94.70 4126.26 -666.27 8489.13 8504.09 0.47 10187.83 72.50 94.53 4152.82 -673.01 8572.57 8587.69 0.30 10286.31 72.94 94.84 4182.07 -680.69 8666.29 8681.62 0.54 10379.76 73.15 94.25 4209.32 -687.77 8755.39 8770.90 0.64 10471.02 72.95 95.27 4235.93 -695.01 8842.39 8858.10 1.09 22 CANRIG Conoco.--Phillips Alaska,Inc. 2L-304 10567.37 72.75 94.41 4264.34 -702.78 8934.12 8950.07 0.88 10658.36 72.56 94.41 4291.47 -709.46 9020.72 9036.80 0.21 10749.28 72.55 94.05 4318.73 -715.86 9107.22 9123.40 0.38 10849.24 72.50 93.68 4348.74 -722.29 9202.35 9218.57 0.36 10944.36 72.19 94.56 4377.59 -728.80 9292.75 9309.06 0.94 11039.37 72.70 94.74 4406.25 -736.14 9383.04 9399.53 0.57 11130.99 72.94 93.87 4433.31 -742.71 9470.32 9486.94 0.94 11228.38 73.33 93.98 4461.57 -749.09 9563.31 9579.96 0.41 11322.99 73.07 93.64 4488.91 -755.11 9653.68 9670.36 0.44 11417.74 72.94 93.85 4516.60 -761.03 9744.10 9760.78 0.25 11512.57 72.82 94.62 4544.52 -767.72 9834.48 9851.27 0.79 11608.71 72.95 92.28 4572.82 -773.25 9926.19 9942.92 2.33 11701.45 72.83 94.17 4600.10 -778.24 10014.68 10031.32 1.95 11793.75 72.82 94.18 4627.36 -784.66 10102.63 10119.36 0.01 11891.21 72.94 94.88 4656.05 -792.01 10195.48 10212.38 0.70 11986.39 72.75 94.94 4684.12 -799.80 10286.09 10303.24 0.21 12079.90 72.25 96.44 4712.24 -808.64 10374.83 10392.38 1.62 12173.01 72.36 95.42 4740.55 -817.80 10463.06 10481.05 1.05 12269.69 72.49 94.76 4769.74 -825.98 10554.86 10573.14 0.66 12363.67 72.62 95.75 4797.91 -834.19 10644.14 10662.73 1.01 12455.51 72.56 95.44 4825.39 -842.73 10731.35 10750.32 0.33 12549.38 72.77 95.60 4853.36 -851.35 10820.54 10839.88 0.28 12645.56 73.14 93.78 4881.56 -858.87 10912.19 10931.73 1.85 12741.14 72.88 93.55 4909.49 -864.71 11003.41 11022.94 0.36 12835.01 71.76 94.35 4937.99 -870.87 11092.63 11112.21 1.44 12888.26 70.48 95.93 4955.23 -875.38 11142.81 11162.55 3.70 12931.56 69.81 96.47 4969.93 -879.78 11183.30 11203.27 1.94 12982.83 69.04 98.49 4987.95 -886.03 11230.89 11251.26 3.98 13024.81 68.10 99.97 5003.29 -892.29 11269.46 11290.32 3.97 13071.90 66.70 101.71 5021.39 -900.47 11312.15 11333.71 4.52 13119.80 65.62 104.01 5040.75 -910.21 11354.86 11377.32 4.94 13164.82 64.80 106.60 5059.63 -921.00 11394.28 11417.80 5.53 13214.09 64.09 109.32 5080.89 -934.70 11436.56 11461.50 5.18 13260.60 63.51 111.09 5101.42 -949.11 11475.72 11502.19 3.64 13309.37 62.70 114.78 5123.49 -966.05 11515.77 11544.09 6.95 13354.99 62.45 116.59 5144.50 -983.60 11552.26 11582.54 3.56 13403.18 61.80 119.31 5167.04 -1003.56 11589.88 11622.43 5.17 14252.10 52.71 148.03 5633.24 -1525.52 12053.84 12149.92 0.41 14295.27 52.23 148.14 5659.54 -1554.58 12071.94 12171.62 1.13 14340.00 52.23 148.14 5686.94 -1584.61 12090.61 12194.00 0.00 23 CANRIG = 1 k 1- � 2 cc + , . . w \ \ co Z / i \ \ & O 0 A & G 6a ' # 03 p < � am z \ \ 66 #$ K co cc & z z z 9 �§ ins 2 \ # z z Nt ChM are4 / CO / / co o f 3 � AA � 9 I o d § & / k k % \U 2 k 1- o • � N y L m c0 _ > % as Ee � a o �� t A. ¥ $ N. ® CI § / � � co C•1 � « \ 0 E e « $ 2 CO c ¥ \ - � � / X. \ \ % o t 2 - # $ n ,_ o 0_ G o o E2 © co _o n re I-2 \ ' �_ - \ B § 5 2 § xS \ - S \ b $ E \ � o k 2 Oct >- xc > � i2 ƒ � � / � a I 10m I c a o Lo r r e L 2 CO ,I 2 6 6 a z CO k k 2 $ U) H CO T- CO Tr C) O N CV V ❑ 1 op 6 i i i Co Cr U) , a0 h 0 CO i i i i i i i i i i i 00 0000O 06 CCi 0 0 0 0 0 0 O O O O O O O O O O O O O O O O O O O O U T r T r co co co Tr Tt OoCOCr Cr d' Tr vvvctvTr Tr vTr Tr NTr Tr 0 0 0 0 0 0 O O O O O O O 0 O O O O O O O O O O 0 O U 0U) U) U) U) 0 O U) U) O000U) O U) OOOOOOOU) CD CD CO CO CO Co U) U) f- Tr U) CO Tr Tr nr nr Tr nt Tr Tr Tr Tr Tr Tr Tr Tr . c0 N N N N M M N M M M M M M M M N N N r O 0 0 0 0 O D O O O O O O O O O O O O co• O 0 0 0 U) U) O O O O U) NN U) O O i , U) I-. I N H F_ 1 1 I t t i i i i i i 0 0 — X. O O iEC) OO C) 0) 0) C) C) 00 CONOOCOODODO000C) 0) 0) NCD0\0CD CD CD N o OJC) 0000000o000) C) C) 0000OD00OD00OOOD o -- -- x— N— T Tr N M M M M M M M N Tt st it Tr Tr Tr Tr Tr O O Cl) •t O C) C) U) f-- f- O C0 00 00 00 C) t• OD CO 00 00 C0 00 • • • Z0 1 � � I � I CL MTr Tr Tr l— l i....1 ^ J NUrtNNO Tr 0Cr O0000N000N0000000C) ODCO �r C U- rq 0o U) U) U) U) - Ti U) U) U) M M M M U) Ti Tf Ti Ti Ti M M M M M �- _,1 U) U) W N O V) Cr OD M CO N N O NT- T N T- N O O r r r V d CO M O Sr.) Tr j M y Cfl M OD N U) oo O O O OD OD O CA O 0 Tr O -, N N ,_ Tr Tr N O r r O N CO O O O r n CO 00 CD CO CD r-CL U) — U) CO CO 0 M U) N M N- M T' M T- T- C) N- C) O 0 CO co N- C) r- >- Tr Cfl M N N M y- N N N N M N N N N N N " N N > U) N00) 0) 0 M u) Tr 0 CD Ul CrCrOD op NN- O0000000r CL M U) nr y- N Cl) U) U) 0 in in N "a O 0 Tr N- O 00 U) Cr t` M 0 0 Tr N O O O N > N N �O N- N- CO 7 nr CO U) U) U) CO U) U) U) nr Tr Tr et Tr Tr Tr Tr Tr Tr Tr 2 L z O U) OD N- N- N C7_r- CO Co N- 00 N- N- ti '7 U) CO Co CO U) a) (0 CO N- N U) d rL C) C) CS; C) C) 0) C) 0) 0) 0) 0) 0) 0) 0) 0) 0) 0) 0) 0) 0) 0) C) 0) 0) 0) CC 7 V O— . 3 — �o Co CO CO CO Co CD O CO CO 2 D fnM � � � vF� I� � NCOMrr` C) U) NNNNNNN03 fV Co O O O ❑ O M O aD 00 00 Co Cr M M 00 M U) U) CO U) U) U) U) U) o N N- M Tr Tr Tr U) C) C) C) N N- U) N N N N -o N_ N N N N M M Cr Tr Tr U) U) U) U) U) 0 U) 0 U) M Q 7 Q. it) N "MO_ OO CD co in in in - iMN � � � Oet � v "v "v44O 10 2 d U (I) C°) C) 2 N CO cy Tr Tr Tr N N N C) C) CO I∎ O O O O O O O M 00 -0 0 NTr Tr Tr Tr •- Tr ❑ Tr to (OCON00O00NMTr Tr Tr Tr vTr Tr Tr C Z 2 U. o— co 0) 0 _1 o ai 000000 aO aj0000000000000000000 0.C) > +al 000000 N N N N N > N T N N N N N N N N N N N N N N N N N N N _ _ • ~ � N M Cr U) O � ~ � ~ O O N M � U) CO f- a0 CO O N. N M � U) Co C 7 ❑ N N N N N N 17 N 17 N CY) M 0 0 0 0 0 0 0 0 0 ✓ 0, 01010) 01C0 M M M M Cr Cr Tr Tr Tr Tr Tr Tr Tr Tr Tr d' `7 d' T' Tr N U, N a a1 U) w N N 5 c 0 L_ mU I E 7 y f6Lu O H II as UW - 0 mow- °- mE o oU ca N O N II U Q Y V < II II II Ocn QU w U) 0 J O 7 N N v in N U N 5 t6 N 'a C7 = 2= O II LLOE Q) • II II it 115 _J o 0 u_ ci) T .. O O �,N N - N >N � � •o 0 > N to 7 c m N L I I I I I 11 11 a2 > a ›- Daily Report Page 1 of 1 ConocoPhilips Alaska,Inc. DAILY WELLSITE REPORT El EPOCH 2L-304 REPORT FOR WHITLOCK DATE Mar 22,2010 DEPTH 630.00000 PRESENT OPERATION DRILLING TIME 24 HOURS YESTERDAY 226.00000 24 HOUR FOOTAGE 404' CASING INFORMATION 16"@ 130' SURVEY DATA DEPTH INCLINATION AZIMUTH VERTICAL DEPTH BIT INFORMATION INTERVAL CONDITION REASON NO. SIZE TYPE S/N JETS IN OUT FOOTAGE HOURS T/B/C PULLED 1 13.5" HTC MXL-1X 5171564 1X16,3X18 SURFACE DRILLING PARAMETERS HIGH LOW AVERAGE CURRENT AVG RATE OF PENETRATION 375.8 @ 243.00000 16.6 @ 226.00000 145.2 83.32755 FT/HR SURFACE TORQUE 0 @ 630.00000 0 @ 630.00000 0.0 0.00000 AMPS WEIGHT ON BIT 21 @ 322.00000 0 @ 259.00000 2.2 0.00000 KLBS ROTARY RPM 0 @ 630.00000 0 @ 630.00000 0.0 0.00000 RPM PUMP PRESSURE 2 @ 323.00000 2 @ 359.00000 0.2 0.00000 PSI DRILLING MUD REPORT DEPTH 500' MW 9.0 VIS PV YP FL Gels CL- FC SOL SD OIL MBL pH Ca+ CCI � MWD SUMMARY INTERVAL TO TOOLS GAS SUMMARY(units) HIGH LOW AVERAGE DITCH GAS 1 @ 372.00000 0 @ 309.00000 0.6 TRIP GAS 0 CUTTING GAS @ @ 0.0 WIPER GAS 0 CHROMATOGRAPHY(ppm) SURVEY 0 METHANE(C-1) 254 @ 347.00000 0 @ 307.00000 109.5 CONNECTION GAS HIGH 0 ETHANE(C-2) 0 @ 630.00000 0 @ 307.00000 0 AVG 0 PROPANE(C-3) 0 @ 630.00000 0 @ 307.00000 0 CURRENT 0 BUTANE(C-4) 0 @ 630.00000 0 @ 307.00000 0 CURRENT BACKGROUND/AVG 1 PENTANE(C-5) 0 @ 630.00000 0 @ 307.00000 0 HYDROCARBON SHOWS NO SHOWS THE LAST 24 HOURS INTERVAL LITHOLOGY/REMARKS GAS DESCRIPTION LITHOLOGY SAND,CONGLOMERATE,CONGLOMERATE SAND,SILTSTONE,CLAYSTONE,CARBONACEOUS MATERIAL PRESENT LITHOLOGY 600'CONGLOMERATE 40%,CONGLOMERATE SAND 20%SANDSTONE 10%SILTSTONE 20%,SAND 10% DAILY ACTIVITY SUMMARY RIG TO DRILL,DRILL OUT FROM SURFACE PIPE TAKING MWD SURVEYS AS NEEDED. 1 EPOCH PERSONNEL ON BOARD BROWNE,WINSLOW+2 SC DAILY COST$2820 REPORT BY LEES F. BROWNE JR file://C:\Documents and Settings\EpochAdmin\My Documents\My Wells\CONOCOPHILI... 3/22/2010 Daily Report Page 1 of 1 ConocoPhilips Alaska,Inc. DAILY WELLSITE REPORT El EPOCH 2L-304 REPORT FOR WITLOCK/CARPENTER DATE Mar 23,2010 DEPTH 2395.00000 PRESENT OPERATION DRILLING TIME 24 HOURS YESTERDAY 630.00000 24 HOUR FOOTAGE 1765' CASING INFORMATION 16"@ 130' SURVEY DATA DEPTH INCLINATION AZIMUTH VERTICAL DEPTH BIT INFORMATION INTERVAL CONDITION REASON NO. SIZE TYPE S/N JETS IN OUT FOOTAGE HOURS T/B/C PULLED 1 13.5" HTC MXL-1X 5171564 1X16 SURFACE DRILLING PARAMETERS HIGH LOW AVERAGE CURRENT AVG RATE OF PENETRATION 892.1 @ 1677.00000 9.9 @ 2236.00000 154.3 312.35538 FT/HR SURFACE TORQUE @ @ AMPS WEIGHT ON BIT 48 @ 1922.00000 0 @ 1692.00000 12.5 28.70000 KLBS ROTARY RPM @ @ RPM PUMP PRESSURE 3642 @ 2273.00000 2 @ 1630.00000 599.6 3642.00000 PSI DRILLING MUD REPORT DEPTH 525' MW 9.0 VIS 285 PV 35 YP 45 FL 12.2 Gels 44/54 CL- 1050 FC 3/ SOL 4 SD 0.25 OIL 0 MBL 34 pH 8.9 Ca+ 40 CCI MWD SUMMARY INTERVAL TO TOOLS GAS SUMMARY(units) HIGH LOW AVERAGE DITCH GAS 2778 @ 1952.00000 0 @ 641.00000 372.8 TRIP GAS 0 CUTTING GAS @ @ WIPER GAS 0 CHROMATOGRAPHY(ppm) SURVEY 0 METHANE(C-1) 484748 @ 1952.00000 103 @ 641.00000 65775.9 CONNECTION GAS HIGH 1313 @ 1395' ETHANE(C-2) 0 @ 2395.00000 0 @ 2395.00000 0.0 AVG 163 PROPANE(C-3) 0 @ 2395.00000 0 @ 2395.00000 0.0 CURRENT 36 BUTANE(C-4) 0 @ 2395.00000 0 @ 2395.00000 0.0 CURRENT BACKGROUND/AVG 300 PENTANE(C-5) 0 @ 2395.00000 0 @ 2395.00000 0.0 HYDROCARBON SHOWS MAXIMUM HYDRATE GAS INTERVAL LITHOLOGY/REMARKS GAS DESCRIPTION 1915'TO 1970' CLAY AND SAND MAX 2778 AT 1952' 70%SAND,30%CLAY LITHOLOGY SAND,CLAYSTONE,SILTSTONE,CONGLOMERATE SAND PRESENT LITHOLOGY 2395'=60%CLAY,40%SAND DAILY ACTIVITY SUMMARY DRILL FORMATION WITH ROUTINE SURVEYS EPOCH PERSONNEL ON BOARD BROWNE, WINSLOW+2 SC DAILY COST$3185 REPORT BY LEES F. BROWNE JR. file://C:\Documents and Settings\EpochAdmin\My Documents\My Wells\CONOCOPHILI... 3/23/2010 Daily Report Page 1 of 1 ConocoPhillips Alaska,Inc. DAILY WELLSITE REPORT 1 EPOCH 2L-304 REPORT FOR WHITLOCK/CARPENTER DATE Mar 24,2010 DEPTH 4269.00000 PRESENT OPERATION DRILLING TIME 24 HOURS YESTERDAY 2395.00000 24 HOUR FOOTAGE 1874' CASING INFORMATION 16"@ 130' DEPTH INCLINATION AZIMUTH VERTICAL DEPTH SURVEY DATA 3509.96 71.83 94.68 2171.13' BIT INFORMATION INTERVAL CONDITION REASON NO. SIZE TYPE S/N JETS IN OUT FOOTAGE HOURS T/B/C PULLED 1 13.5" HTC MXL-1X 5171564 1X16 3X18 SURFACE DRILLING PARAMETERS HIGH LOW AVERAGE CURRENT AVG RATE OF PENETRATION 570.1 @ 3366.00000 8.8 @ 3173.00000 109.4 11.30756 FT/HR SURFACE TORQUE @ @ AMPS WEIGHT ON BIT 49 @ 2474.00000 3 @ 3297.00000 20.7 21.90000 KLBS ROTARY RPM @ @ RPM PUMP PRESSURE 3642 @ 2395.00000 2 @ 3029.00000 595.3 204.00000 PSI DRILLING MUD REPORT DEPTH 4173' MW 9.8 VIS 100 PV 40 YP 35 FL 5.4 Gels 10/37/55 CL- 650 FC 4/- SOL 10 SD 1.5 OIL 1 MBL 27 pH 9.3 Ca+ 80 CCI MWD SUMMARY INTERVAL TO TOOLS GAS SUMMARY(units) HIGH LOW AVERAGE DITCH GAS 2530 @ 2395.00000 0 @ 4105.00000 534.8 TRIP GAS- CUTTING GAS @ @ WIPER GAS- CHROMATOGRAPHY(ppm) SURVEY- METHANE(C-1) 1627975 @ 3169.00000 115 @ 3193.00000 118658.1 CONNECTION GAS HIGH 80 @ 3845' ETHANE(C-2) 2001 @ 3537.00000 0 @ 4102.00000 143.0 AVG 45 PROPANE(C-3) 73 @ 3537.00000 0 @ 3755.00000 5.9 CURRENT 0 BUTANE(C-4) 48 @ 3537.00000 0 @ 3755.00000 2.7 CURRENT BACKGROUND/AVG 135 PENTANE(C-5) 0 @ 4269.00000 0 @ 4269.00000 0.0 HYDROCARBON SCATTERED POOR OIL SHOWS SHOWS INTERVAL LITHOLOGY/REMARKS GAS DESCRIPTION 3500 TO 3750' 50%SAND/50%CLAY GRADING TO 100% BEFORE 700 MAX GAS HYDRATE BACKGROUND BEFORE SHOW.NOTED C-4 SAND AFTER 3600' 1618 AFTER 250 WITH POOR TO FAIR SLOW OIL CUTS. LITHOLOGY SAND,CLAY,SILT PRESENT LITHOLOGY 4270'=SAND 50%CLAY 50% DAILY ACTIVITY SUMMARY DRILL FORMATION WITH ROUTINE SURVEYS EPOCH PERSONNEL ON BOARD BROWNE,WINSLOW+2 SC DAILY COST$3185 REPORT BY LEES F. BROWNE JR. file://C:\Documents and Settings\EpochAdmin\My Documents\My Wells\CONOCOPHILI... 3/24/2010 Daily Report Page 1 of 1 ConocoPhillips Alaska,Inc. DAILY WELLSITE REPORT HI EPOCH 2L-304 REPORT FOR WHITLOCK/CARPENTER DATE Mar 25,2010 DEPTH 4310.00000 PRESENT OPERATION TRIP OUT LAY DOWN BHA TIME 24 HOURS YESTERDAY 4269.00000 24 HOUR FOOTAGE 41 CASING INFORMATION 16"@ 130' DEPTH INCLINATION AZIMUTH VERTICAL DEPTH SURVEY DATA 4310' 2402.54' BIT INFORMATION INTERVAL CONDITION REASON NO. SIZE TYPE S/N JETS IN OUT FOOTAGE HOURS T/B/C PULLED 1 13.5" HTC MXL-1X 5171564 1X16,3X18 130' 4310' 4080' N/A TD I DRILLING PARAMETERS HIGH LOW AVERAGE CURRENT AVG RATE OF PENETRATION 111.3 @ 4305.00000 11.3 @ 4269.00000 70.4 87.23300 FT/HR SURFACE TORQUE @ @ AMPS WEIGHT ON BIT 23 @ 4270.00000 13 @ 4272.00000 19.8 21.30000 KLBS ROTARY RPM @ @ RPM PUMP PRESSURE 301 @ 4307.00000 194 @ 4270.00000 248.7 269.00000 PSI DRILLING MUD REPORT DEPTH 4310' MW 9.7 VIS 75 PV 19 YP 26 FL 5.2 Gels 8/20/34 CL- 650 FC 4/- SOL 9 SD 1 OIL 1 MBL 32 pH 9.0 Ca+ 80 CCI MWD SUMMARY INTERVAL TO I TOOLS GAS SUMMARY(units) HIGH LOW AVERAGE DITCH GAS 301 @ 4272.00000 89 @ 4270.00000 178.8 TRIP GAS- CUTTING GAS @ @ WIPER GAS 305 @ 4310' CHROMATOGRAPHY(ppm) SURVEY- METHANE(C-1) 54039 @ 4288.00000 12694 @ 4310.00000 30597.3 CONNECTION GAS HIGH 0 ETHANE(C-2) 89 @ 4272.00000 11 @ 4285.00000 39.1 AVG 0 I PROPANE(C-3) 0 @ 4310.00000 0 @ 4310.00000 0.0 CURRENT 0 BUTANE(C-4) 0 @ 4310.00000 0 @ 4310.00000 0.0 CURRENT BACKGROUND/AVG 0 PENTANE(C-5) 0 @ 4310.00000 0 @ 4310.00000 0.0 HYDROCARBON SHOWS NO SHOWS THE LAST 24 HOURS INTERVAL LITHOLOGY/REMARKS GAS DESCRIPTION LITHOLOGY SAND,CLAY,SILT I PRESENT LITHOLOGY 4310'=70%SAND,30%CLAY DRILL TO 4310',PUMP A HIGH VIS SWEEP,ROTATE AND RECIPROCATE THE HOLE,PULL OUT OF THE HOLE FOR A WIPER TRIP, DAILY BACK REAM TO THE HWDP,HOLE IS TIGHT AT 590',WORK THROUGH THE TIGHT SECTION,RUN IN THE HOLE AND TAG AT 690', ACTIVITY WORK THROUGH TIGHT SPOT,RUN IN THE HOLE TO 4310'WITH NO FILL,CIRCULATE BOTTOMS UP,WIPER GAS=305 UNITS,PULL SUMMARY OUT OF THE HOLE WITH TIGHT SPOTS AT 1475',1141',1114',AND 1090',STAND BACK THE HWDP AND JARS,LAY DOWN THE COLLARS,DOWN LOAD THE MWD DATA AND LAY DOWN THE BHA. EPOCH PERSONNEL ON BOARD BROWNE,WINSLOW+2 SC DAILY COST$3185 REPORT BY LEES F. BROWNE JR. II file://C:\Documents and Settings\EpochAdmin\My Documents\My Wells\CONOCOPHILI... 3/25/2010 Daily Report Page 1 of 1 ConocoPhillips Alaska,Inc. DAILY WELLSITE REPORT PI EPOCH 2L-304 REPORT FOR WHITLOCK/CARPENTER DATE Mar 26,2010 DEPTH 4310.00000 PRESENT OPERATION TRIP OUT LAY DOWN BHA TIME 24 HOURS YESTERDAY 4269.00000 24 HOUR FOOTAGE 41 CASING INFORMATION 16"@ 130' DEPTH INCLINATION AZIMUTH VERTICAL DEPTH SURVEY DATA 4310' 2402.54' BIT INFORMATION INTERVAL CONDITION REASON NO. SIZE TYPE S/N JETS IN OUT FOOTAGE HOURS T/B/C PULLED 1 13.5" HTC MXL-1X 5171564 1X16,3X18 130' 4310' 4080' N/A TD DRILLING PARAMETERS HIGH LOW AVERAGE CURRENT AVG RATE OF PENETRATION 111.3 @ 4305.00000 11.3 @ 4269.00000 70.4 87.23300 FT/HR SURFACE TORQUE @ @ AMPS WEIGHT ON BIT 23 @ 4270.00000 13 @ 4272.00000 19.8 21.30000 KLBS ROTARY RPM @ @ RPM PUMP PRESSURE 301 @ 4307.00000 194 @ 4270.00000 248.7 269.00000 PSI DRILLING MUD REPORT DEPTH 4310' MW 9.7 VIS 75 PV 19 YP 26 FL 5.2 Gels 8/20/34 CL- 650 FC 4/- SOL 9 SD 1 OIL 1 MBL 32 pH 9.0 Ca+ 80 CCI MWD SUMMARY INTERVAL TO TOOLS GAS SUMMARY(units) HIGH LOW AVERAGE DITCH GAS 301 @ 4272.00000 89 @ 4270.00000 178.8 TRIP GAS- CUTTING GAS @ @ WIPER GAS 305 @ 4310' CHROMATOGRAPHY(ppm) SURVEY- METHANE(C-1) 54039 @ 4288.00000 12694 @ 4310.00000 30597.3 CONNECTION GAS HIGH 0 ETHANE(C-2) 89 @ 4272.00000 11 @ 4285.00000 39.1 AVG 0 PROPANE(C-3) 0 @ 4310.00000 0 @ 4310.00000 0.0 CURRENT 0 BUTANE(C-4) 0 @ 4310.00000 0 @ 4310.00000 0.0 CURRENT BACKGROUND/AVG 0 PENTANE(C-5) 0 @ 4310.00000 0 @ 4310.00000 0.0 HYDROCARBON SHOWS NO SHOWS THE LAST 24 HOURS INTERVAL LITHOLOGY/REMARKS GAS DESCRIPTION LITHOLOGY SAND,CLAY,SILT PRESENT LITHOLOGY 4310'=70%SAND,30%CLAY DRILL TO 4310',PUMP A HIGH VIS SWEEP,ROTATE AND RECIPROCATE THE HOLE,PULL OUT OF THE HOLE FOR A WIPER TRIP, DAILY BACK REAM TO THE HWDP,HOLE IS TIGHT AT 590',WORK THROUGH THE TIGHT SECTION,RUN IN THE HOLE AND TAG AT 690', ACTIVITY WORK THROUGH TIGHT SPOT,RUN IN THE HOLE TO 4310'WITH NO FILL,CIRCULATE BOTTOMS UP,WIPER GAS=305 UNITS,PULL SUMMARY OUT OF THE HOLE WITH TIGHT SPOTS AT 1475',1141',1114',AND 1090',STAND BACK THE HWDP AND JARS,LAY DOWN THE COLLARS,DOWN LOAD THE MWD DATA AND LAY DOWN THE BHA. EPOCH PERSONNEL ON BOARD BROWNE, WINSLOW+2 SC DAILY COST$3185 REPORT BY LEES F. BROWNE JR. file://C:\Documents and Settings\EpochAdmin\My Documents\My Wells\2L-304 data\MO... 3/26/2010 Daily Report Page 1 of 1 ConocoPhillips Alaska,Inc. DAILY WELLSITE REPORT EPOCH 2L-304 REPORT FOR WITLOCK/HABERTHUR DATE Mar 27,2010 DEPTH 4310.00000 PRESENT OPERATION PREP TO NIPPLE DOWN AFTER CEMENTING CSG TIME 24 HOURS YESTERDAY 4310.00000 24 HOUR FOOTAGE 0 CASING INFORMATION 10.75"@ 1430' DEPTH INCLINATION AZIMUTH VERTICAL DEPTH SURVEY DATA 4310' 2402.54' BIT INFORMATION INTERVAL CONDITION REASON NO. SIZE TYPE S/N JETS IN OUT FOOTAGE HOURS T/B/C PULLED 1 13.5" HTC MXL-1X 5171564 1X16,3X18 130' 4310' 4080 35 TD DRILLING PARAMETERS HIGH LOW AVERAGE CURRENT AVG RATE OF PENETRATION @ @ FT/HR SURFACE TORQUE @ @ AMPS WEIGHT ON BIT @ @ KLBS ROTARY RPM @ @ RPM PUMP PRESSURE @ @ PSI DRILLING MUD REPORT DEPTH 4310 MW 9.7 VIS 75 PV 19 YP 26 FL 5.2 Gels 8/20/34 CL- 650 FC 4/- SOL 9 SD 1 OIL 1 MBL 32 pH 9.0 Ca+ 80 CCI MWD SUMMARY INTERVAL TO TOOLS GAS SUMMARY(units) HIGH LOW AVERAGE DITCH GAS @ @ TRIP GAS 275 CUTTING GAS @ @ WIPER GAS- CHROMATOGRAPHY(ppm) SURVEY- METHANE(C-1) @ @ CONNECTION GAS HIGH- ETHANE(C-2) @ @ AVG- PROPANE(C-3) @ @ CURRENT- BUTANE(C-4) @ @ CURRENT BACKGROUND/AVG- PENTANE(C-5) @ @ HYDROCARBON SHOWS RETURNS AFTER CASING WAS RUN DEVERTED FROM GAS TRAP INTERVAL LITHOLOGY/REMARKS GAS DESCRIPTION LITHOLOGY PRESENT LITHOLOGY 100%CEMENT DAILY FINISH LAYING DOWN THE DRILLING BHA,CLEAN AND CLEAR THE RIG FLOOR,MAKE UP THE STACK WASHER AND BREAK DOWN ACTIVITY THE TOP DRIVE,RIG UP TO RUN 10 3/4"CASING,RUN IN THE HOLE TO 4266'RECIPROCATE THE HOLE PUMPING 6 BPM,MAXIMUM SUMMARY GAS WAS 275 UNITS,RIG UP THE CEMENT HEAD,TEST LINES TO 3500 PSI,PUMP CEMENT TO THE HOLE,RIG DOWN THE CEMENT LINE,PREP TO NIPPLE DOWN. EPOCH PERSONNEL ON BOARD BROWNE,WINSLOW+2 SC DAILY COST$3185 REPORT BY LEES F. BROWNE JR. file://C:\Documents and Settings\EpochAdmin\My Documents\My Wells\CONOCOPHILI... 3/27/2010 Daily Report Page 1 of 1 ConocoPhillips Alaska,Inc. DAILY WELLSITE REPORT El EPOCH 2L-304 REPORT FOR WITLOCK/HABERTHUR DATE Mar 28,2010 DEPTH 4310.00000 PRESENT OPERATION TESTING BOPE TIME 24 HOURS YESTERDAY 4310.00000 24 HOUR FOOTAGE 0 CASING INFORMATION 10.75"@ 1430' DEPTH INCLINATION AZIMUTH VERTICAL DEPTH SURVEY DATA 4310' 2402.54' BIT INFORMATION INTERVAL CONDITION REASON NO. SIZE TYPE S/N JETS IN OUT FOOTAGE HOURS T/B/C PULLED DRILLING PARAMETERS HIGH LOW AVERAGE CURRENT AVG 1 RATE OF PENETRATION @ @ FT/HR SURFACE TORQUE @ @ AMPS WEIGHT ON BIT @ @ KLBS ROTARY RPM @ @ RPM PUMP PRESSURE @ @ PSI DRILLING MUD REPORT DEPTH 1 MW VIS PV YP FL Gels CL- FC SOL SD OIL MBL pH Ca+ CCI MWD SUMMARY INTERVAL TO TOOLS GAS SUMMARY(units) HIGH LOW AVERAGE DITCH GAS @ @ TRIP GAS- CUTTING GAS @ @ WIPER GAS- CHROMATOGRAPHY(ppm) SURVEY- METHANE(C-1) @ @ CONNECTION GAS HIGH- ETHANE(C-2) @ @ AVG- PROPANE(C-3) @ @ CURRENT- BUTANE(C-4) @ @ CURRENT BACKGROUND/AVG- PENTANE(C-5) @ @ HYDROCARBON SHOWS NO SHOWS THE LAST 24 HOURS INTERVAL LITHOLOGY/REMARKS GAS DESCRIPTION LITHOLOGY PRESENT LITHOLOGY 100%CEMENT DAILY ACTIVITY NIPPLE DOWN THE DIVERTER LINE,CLEAN THE RIG FLOOR OF CASING TOOLS,NIPPLE UP CSG AND TBG SPOOL,NIPPLE UP SUMMARY BOPE,FUNCTION TEST ALL BOP COMPONENTS,REMOVE ICE PLUG FROM THE KILL LINE,TEST BOPE 250 LOW/3500 HIGH, TEST ANNULER TO 250 LOW/2500 HIGH EPOCH PERSONNEL ON BOARD BROWNE, WINSLOW+2 SC DAILY COST$3185 REPORT BY LEES F. BROWNE JR. file://C:\Documents and Settings\EpochAdmin\My Documents\My Wells\CONOCOPHILL.. 3/28/2010 Daily Report Page 1 of 1 ConocoPhillips Alaska,Inc. DAILY WELLSITE REPORT El EPOCH 2L-304 REPORT FOR WITLOCK/HABERTHUR DATE Mar 29,2010 DEPTH 4310.00000 PRESENT OPERATION DRILLING CEMENT TIME 24 HOURS YESTERDAY 4310.00000 24 HOUR FOOTAGE 0 CASING INFORMATION 10.75"@ 1430' DEPTH INCLINATION AZIMUTH VERTICAL DEPTH SURVEY DATA 4310' 2402.54' BIT INFORMATION INTERVAL CONDITION REASON NO. SIZE TYPE S/N JETS IN OUT FOOTAGE HOURS T/B/C PULLED 2 9.875" REED HYCALOG DTX619MB10 124653 6X13 4310' DRILLING PARAMETERS HIGH LOW AVERAGE CURRENT AVG RATE OF PENETRATION @ @ FT/HR SURFACE TORQUE @ @ AMPS WEIGHT ON BIT @ @ KLBS ROTARY RPM @ @ RPM PUMP PRESSURE @ @ PSI DRILLING MUD REPORT DEPTH 4310' MW 9.1 VIS 40 PV YP FL Gels CL- FC SOL SD OIL MBL pH Ca+ CCI MWD SUMMARY INTERVAL TO TOOLS GAS SUMMARY(units) HIGH LOW AVERAGE DITCH GAS @ @ TRIP GAS- CUTTING GAS @ @ WIPER GAS- CHROMATOGRAPHY(ppm) SURVEY- METHANE(C-1) @ @ CONNECTION GAS HIGH- ETHANE(C-2) @ @ AVG- PROPANE(C-3) @ @ CURRENT- BUTANE(C-4) @ @ CURRENT BACKGROUND/AVG- PENTANE(C-5) @ @ HYDROCARBON SHOWS BYPASSING SHALE SHAKERS DRILLING OUT FLOAT AND CEMENT=NO GAS READINGS INTERVAL LITHOLOGY/REMARKS GAS DESCRIPTION LITHOLOGY PRESENT LITHOLOGY 4310'=100%CEMENT RIG DOWN BOP TEST EQUIPMENT,BLOW DOWN LINES,GATHER UP BHA,SERVICE THE TOP DRIVE,MAKE UP BHA,UP LOAD THE DAILY MWD SOURCE,PICK UP THE BHA,SHALLOW TEST THE MWD TOOLS,PICK UP DRILL PIPE TO 4193',WASH DOWN AND BYPASS ACTIVITY GAS DETECTOR AND SHAKERS,TEST THE CASING TO 3000 PSI AND HOLD FOR 30 MINS,BREAK DOWN THE TEST EQUIPMENT SUMMARY AND WASH DOWN AND TAG THE FLOAT EQUIPMENT AT 4213',DRILL OUT THE FLOAT EQUIPMENT TO 4216'AND RUN IN THE HOLE TO LOCATE THE TOP OF THE CEMENT. EPOCH PERSONNEL ON BOARD BROWNE,WINSLOW+2 SC DAILY COST$3185 REPORT BY LEES F. BROWNE JR. file://C:\Documents and Settings\EpochAdmin\My Documents\My Wells\CONOCOPHILI... 3/29/2010 Daily Report Page 1 of 1 ConocoPhillips Alaska,Inc. DAILY WELLSITE REPORT HI EPOCH 2L-304 REPORT FOR WITLOCK/HABERTHUR DATE Mar 30,2010 DEPTH 4895.00000 PRESENT OPERATION DRILLING TIME 24 HOURS YESTERDAY 4310.00000 24 HOUR FOOTAGE 585' CASING INFORMATION 10.75"@ 4297' DEPTH INCLINATION AZIMUTH VERTICAL DEPTH SURVEY DATA 4310' 2402.54' BIT INFORMATION INTERVAL CONDITION REASON NO. SIZE TYPE S/N JETS IN OUT FOOTAGE HOURS T/B/C PULLED 2 9.875" REED HYCALOG DTX619MB10 124653 6X13 4310 5 DRILLING PARAMETERS HIGH LOW AVERAGE CURRENT AVG RATE OF PENETRATION 837.8 @ 4626.00000 7.1 @ 4614.00000 174.0 148.96346 FT/HR SURFACE TORQUE 0 @ 4895.00000 0 @ 4895.00000 0.0 0.00000 AMPS WEIGHT ON BIT 35 @ 4793.00000 6 @ 4623.00000 15.0 19.00000 KLBS ROTARY RPM 0 @ 4895.00000 0 @ 4895.00000 0.0 0.00000 RPM PUMP PRESSURE 269 @ 4310.00000 269 @ 4310.00000 0.5 0.00000 PSI DRILLING MUD REPORT DEPTH 4828' MW 9.6 VIS 60 PV 15 YP 25 FL 4.4 Gels 11/13/14 CL- 750 FC 1/- SOL 7 SD - OIL 4 MBL 10 pH 9.5 Ca+ 80 CCI MWD SUMMARY INTERVAL TO TOOLS GAS SUMMARY(units) HIGH LOW AVERAGE DITCH GAS 101 @ 4310.00000 0 @ 4338.00000 12.6 TRIP GAS 0 @ CSG CUTTING GAS @ @ WIPER GAS- CHROMATOGRAPHY(ppm) SURVEY- METHANE(C-1) 12796 @ 4310.00000 24 @ 4338.00000 2287.7 CONNECTION GAS HIGH 0 ETHANE(C-2) 89 @ 4891.00000 0 @ 4338.00000 17.5 AVG 0 PROPANE(C-3) 0 @ 4895.00000 0 @ 4895.00000 0.0 CURRENT 0 BUTANE(C-4) 0 @ 4895.00000 0 @ 4895.00000 0.0 CURRENT BACKGROUND/AVG 14 PENTANE(C-5) 0 @ 4895.00000 0 @ 4895.00000 0.0 HYDROCARBON SHOWS NO SHOWS THE LAST 24 HOURS INTERVAL LITHOLOGY/REMARKS GAS DESCRIPTION LITHOLOGY SAND,SILT,CLAY,ASH I PRESENT LITHOLOGY 4895'=SAND 30%,SILT 40%,CLAY 30% DAILY WASH AND ROTATE DOWN AND TAG AND DRILL THROUGH CEMENT AT 4292',TAG AND DRILL THROUGH THE SHOE AT 4294',TAG ACTIVITY BOTTOM AT 4310'AND DRILL FORMATION TO 4330',PUMP A HIGH VISCOSITY SWEEP AND PULL OUT OF THE HOLE TO 4290', SUMMARY OBTAIN FIT/LOT 860 PSI,16 PPG EMW,CLEAN MUD PITS AND CHANGE OVER THE MUD TO LSND,DRILL FROM 4330'TO 4543', EQUILIZER LINE FROZEN FROM NEW PITS TO OLD PITS(4 HOURS),UNTHAW AND DRILL TO 4895' EPOCH PERSONNEL ON BOARD BROWNE, WINSLOW+2 SC DAILY COST$3185 REPORT BY LEES F. BROWNE JR. file://C:\Documents and Settings\EpochAdmin\My Documents\My Wells\CONOCOPHILI... 3/30/2010 Daily Report Page 1 of 1 ConocoPhillips Alaska,Inc. DAILY WELLSITE REPORT EI EPOCH 2L-304 REPORT FOR HABERTHUR/WHITLOCK DATE Mar 31,2010 DEPTH 6407.00000 PRESENT OPERATION CIRCULATE AT 4407' TIME 24 HOURS YESTERDAY 4895.00000 24 HOUR FOOTAGE 1512' CASING INFORMATION 10.75"@ 4297' DEPTH INCLINATION AZIMUTH VERTICAL DEPTH SURVEY DATA 6405' 2988.19 BIT INFORMATION INTERVAL CONDITION REASON NO. SIZE TYPE S/N JETS IN OUT FOOTAGE HOURS T/B/C PULLED 2 9.875' REED HYCALOG DTX619MB10 124653 6X13 4310 14:35 DRILLING PARAMETERS HIGH LOW AVERAGE CURRENT AVG RATE OF PENETRATION 1316.8 @ 6032.00000 10.3 @ 6352.00000 172.4 149.60700 FT/HR SURFACE TORQUE @ @ AMPS WEIGHT ON BIT 50 @ 6351.00000 2 @ 6277.00000 16.7 4.20000 KLBS ROTARY RPM @ @ RPM PUMP PRESSURE @ @ PSI DRILLING MUD REPORT DEPTH 6407' MW 9.6 VIS 48 PV YP FL Gels CL- FC SOL SD OIL MBL pH Ca+ CCI MWD SUMMARY INTERVAL TO TOOLS GAS SUMMARY(units) HIGH LOW AVERAGE DITCH GAS 69 @ 6294.00000 0 @ 6311.00000 18.4 TRIP GAS- CUTTING GAS @ @ WIPER GAS- CHROMATOGRAPHY(ppm) SURVEY- METHANE(C-1) 12711 @ 6294.00000 24 @ 6311.00000 1390.8 CONNECTION GAS HIGH 0 ETHANE(C-2) 97 @ 6302.00000 0 @ 6125.00000 6.7 AVG 0 PROPANE(C-3) 0 @ 6407.00000 0 @ 6407.00000 0.0 CURRENT 0 BUTANE(C-4) 0 @ 6407.00000 0 @ 6407.00000 0.0 CURRENT BACKGROUND/AVG 8 CIRC PENTANE(C-5) 0 @ 6407.00000 0 @ 6407.00000 0.0 HYDROCARBON SHOWS NO SHOWS THE LAST 24 HOURS INTERVAL LITHOLOGY/REMARKS GAS DESCRIPTION LITHOLOGY SILT,CLAY,SAND,SANDSTONE PRESENT LITHOLOGY 6407'=90%SILT,10%CLAY DAILY ACTIVITY DRILL FORMATION FROM 4895'TO 6407',PUMP A HIGH VISCOSITY SWEEP AND CIRCULATE AND CONDITION THE SUMMARY HOLE. EPOCH PERSONNEL ON BOARD BROWNE,WINSLOW+2 SC DAILY COST $3185 REPORT BY LEES F. BROWNE JR. file://C:\Documents and Settings\EpochAdmin\My Documents\My Wells\CONOCOPHILI... 3/31/2010 Daily Report Page 1 of 1 ConocoPhillips Alaska,Inc. DAILY WELLSITE REPORT El EPOCH 2L-304 REPORT FOR HABERTHUR/GRANVILLE DATE Apr 01,2010 DEPTH 6407.00000 PRESENT OPERATION WASH OUT STACK/WORK ON TOP DRIVE TIME 24 HOURS YESTERDAY 6407.00000 24 HOUR FOOTAGE 0 CASING INFORMATION 10.75"@ 4297' DEPTH INCLINATION AZIMUTH VERTICAL DEPTH SURVEY DATA 6405' 2988.19' BIT INFORMATION INTERVAL CONDITION REASON NO. SIZE TYPE S/N JETS IN OUT FOOTAGE HOURS T/B/C PULLED 2 9.875" REED HYCALOG DTX619MB10 124653 6X13 4310 6407 2097' 14.82 0-3-CT-G-X-I-WT BHA DRILLING PARAMETERS HIGH LOW AVERAGE CURRENT AVG RATE OF PENETRATION @ @ FT/HR SURFACE TORQUE @ @ AMPS WEIGHT ON BIT @ @ KLBS ROTARY RPM @ @ RPM PUMP PRESSURE @ @ PSI DRILLING MUD REPORT DEPTH 4607' MW 9.7 VIS 57 PV 15 YP 23 FL 5.4 Gels 11/16/24 CL- 500 FC 1/- SOL 8 SD TR OIL 1 MBL 20 pH 9.8 Ca+ 40 CCI MWD SUMMARY INTERVAL TO 1 TOOLS GAS SUMMARY(units) HIGH LOW AVERAGE DITCH GAS 46 @ SHOE 1 @ POOH 7 TRIP GAS- CUTTING GAS @ @ WIPER GAS- CHROMATOGRAPHY(ppm) SURVEY- METHANE(C-1) @ @ CONNECTION GAS HIGH- ETHANE(C-2) @ @ AVG- PROPANE(C-3) @ @ CURRENT- BUTANE(C-4) @ @ CURRENT BACKGROUND/AVG- PENTANE(C-5) @ @ HYDROCARBON SHOWS NO SHOWS THE LAST 24 HOURS/MAX GAS POOH WAS 46 UNITS @ THE SHOE INTERVAL LITHOLOGY/REMARKS GAS DESCRIPTION LITHOLOGY PRESENT LITHOLOGY 6407'=90%SILT,10%CLAY DAILY INCREASE MUD WEIGHT FROM 9.5 TO 9.6,BACK REAM FROM 6407'TO THE SHOE(4297'),PUMP A HIGH VIS SWEEP WITH A ACTIVITY MAXIMUM GAS READING FROM TD TO THE SHOE OF 46 UNITS,TROUBLE SHHOT THE TOP DRIVE,BACK REAM OUT OF THE HOLE 1 SUMMARY FROM THE SHOE W MV VD A MAXIMUM GAS OF 7 UNITS,DOWNLOAD THE MD DATA AND LAY DOWN THE BHA,CLEAN THE RIG FLOOR,MAKE UP THE STACK WASHER AND WASH OUT THE STACK. EPOCH PERSONNEL ON BOARD BROWNE, WINSLOW+2 SC DAILY COST$3235 REPORT BY LEES F. BROWNE JR. file://C:\Documents and Settings\EpochAdmin\My Documents\My Wells\CONOCOPHILIP... 4/1/2010 Daily Report Page 1 of 1 ConocoPhillips Alaska,Inc. DAILY WELLSITE REPORT El EPOCH 2L-304 REPORT FOR GRANVILLE/HABERTHUR DATE Apr 02,2010 DEPTH 6407.00000 PRESENT OPERATION TRIP IN HOLE TO DRILL TIME 24 HOURS YESTERDAY 6407.00000 24 HOUR FOOTAGE 0' CASING INFORMATION 10.75"@ 4297' DEPTH INCLINATION AZIMUTH VERTICAL DEPTH SURVEY DATA 6405' 2988.19' BIT INFORMATION INTERVAL CONDITION REASON NO. SIZE TYPE S/N JETS IN OUT FOOTAGE HOURS T/B/C PULLED 3 9.875" HDBS FXG56S 11410613 3X16,2X17 6407' 0 DRILLING PARAMETERS HIGH LOW AVERAGE CURRENT AVG RATE OF PENETRATION @ @ FT/HR SURFACE TORQUE @ @ AMPS WEIGHT ON BIT @ @ KLBS ROTARY RPM @ @ RPM PUMP PRESSURE @ @ PSI DRILLING MUD REPORT DEPTH 6405' MW 9.8 VIS 50 PV 10 YP 27 FL 5 Gels 12/13/13 CL- 600 FC 1/- SOL 8 SD - OIL 3 MBL - pH 9.5 Ca+ 40 CCI MWD SUMMARY INTERVAL TO TOOLS GAS SUMMARY(units) HIGH LOW AVERAGE DITCH GAS 2 @ 2066' 0 @ TIH 2 TRIP GAS- CUTTING GAS @ @ WIPER GAS- CHROMATOGRAPHY(ppm) SURVEY- METHANE(C-1) @ @ CONNECTION GAS HIGH- ETHANE(C-2) @ @ AVG- PROPANE(C-3) @ @ CURRENT- BUTANE(C-4) @ @ CURRENT BACKGROUND/AVG- PENTANE(C-5) @ @ HYDROCARBON SHOWS NO SHOWS THE LAST 24 HOURS.MAXIMUM GAS CIRCULATING AT 2066'WAS 2 UNITS INTERVAL LITHOLOGY/REMARKS GAS DESCRIPTION LITHOLOGY ' PRESENT LITHOLOGY 6407'=90%SILT,10%CLAY WASH THE STACK,FUNCTION RAMS,BREAK DOWN THE TOP DRIVE,MAKE UP MULE SHOE,RUN IN THE HOLE TO 2066', DAILY CIRCULATE AND CONDITION THE MUD,MAXIMUM GAS WAS 2 UNITS,REPAIR THE TOP DRIVE,CIRCULATE AND CONDITION AND ACTIVITY PULL OUT OF THE HOLE TO THE SURFACE,CLEAN THE RIG FLOOR,MAKE UP THE BHA,MAKE UP THE GEO PILOT AND NEW BIT, SUMMARY UPLOAD MWD TOOL,SHALLOW TEST THE MWD TOOL,TEST THE LINK TO THE GEO PILOT(GGOD),LOAD THE NUKES,RUN IN THE HOLE ON 5"DRILL PIPE SINGLES EPOCH PERSONNEL ON BOARD BROWNE, WINSLOW+2 SC DAILY COST$3235 REPORT BY LEES F. BROWNE JR. file://C:\Documents and Settings\EpochAdmin\My Documents\My Wells\CONOCOPHILIP... 4/2/2010 Daily Report Page 1 of 1 ConocoPhillips Alaska,Inc. DAILY WELLSITE REPORT El EPOCH 2L-304 REPORT FOR GRANVILLE/HABERTHUR DATE Apr 03,2010 DEPTH 7467.00000 PRESENT OPERATION DRILLING TIME 24 HOURS YESTERDAY 6407.00000 24 HOUR FOOTAGE 1060 CASING INFORMATION 10.75"@ 4297' DEPTH INCLINATION AZIMUTH VERTICAL DEPTH SURVEY DATA 6405' 2988.19' BIT INFORMATION INTERVAL CONDITION REASON NO. SIZE TYPE S/N JETS IN OUT FOOTAGE HOURS T/B/C PULLED 3 9.875" HDBS FXG56S 11410613 3X16,2X17 6407' 8 DRILLING PARAMETERS HIGH LOW AVERAGE CURRENT AVG RATE OF PENETRATION 243.8 @ 7393.00000 15.7 @ 7214.00000 141.3 107.91367 FT/HR SURFACE TORQUE @ @ AMPS WEIGHT ON BIT 16 @ 7128.00000 1 @ 7356.00000 9.5 8.40000 KLBS ROTARY RPM @ @ RPM PUMP PRESSURE 5441 @ 7253.00000 2134 @ 7355.00000 648.5 2422.00000 PSI DRILLING MUD REPORT DEPTH 7291' MW 9.7 VIS 68 PV 15 YP 33 FL 3.8 Gels 16/18/22 CL- 400 FC 1/- SOL 8 SD 0.25 OIL 3 MBL 8 pH 9.6 Ca+ 40 CCI MWD SUMMARY INTERVAL TO TOOLS GAS SUMMARY(units) HIGH LOW AVERAGE DITCH GAS 58 @ 6407.00000 0 @ 7453.00000 15.8 TRIP GAS 9 @ 6407' CUTTING GAS @ @ WIPER GAS- CHROMATOGRAPHY(ppm) SURVEY- METHANE(C-1) 10607 @ 6407.00000 105 @ 6411.00000 2955.9 CONNECTION GAS HIGH 0 ETHANE(C-2) 67 @ 6407.00000 0 @ 6459.00000 22.6 AVG 0 PROPANE(C-3) 0 @ 7467.00000 0 @ 7467.00000 0.0 CURRENT 0 BUTANE(C-4) 0 @ 7467.00000 0 @ 7467.00000 0.0 CURRENT BACKGROUND/AVG 9 PENTANE(C-5) 0 @ 7467.00000 0 @ 7467.00000 0.0 HYDROCARBON SHOWS NO SHOWS THE LAST 24 HOURS INTERVAL LITHOLOGY/REMARKS GAS DESCRIPTION LITHOLOGY SILT,SAND,SANDSTONE,CLAY PRESENT LITHOLOGY 7460'=100%SILTSTONE DAILY ACTIVITY PICK UP DRILL PIPE FROM 1494'TO 4350'AND RUN IN THE HOLE FROM THE DERRICK TO 6247',PUMP THROUGH TIGHT SPOT AT SUMMARY 5014',REAM DOWN TO BOTTOM FROM 6247'TO 6343'AND DISPLACE OLD MUD WITH NEW LSND MUD,TRIP GAS WAS 9 UNITS, DRILL FORMATION FRON 6407'TO 7387'AND SERVICE AND INSPECT THE TOP DRIVE(1/2 HOUR),DRILL AHEAD EPOCH PERSONNEL ON BOARD BROWNE,WINSLOW+2 SC DAILY COST$4035 REPORT BY LEES F. BROWNE JR. file://C:\Documents and Settings\EpochAdmin\My Documents\My Wells\CONOCOPHILIP... 4/3/2010 Daily Report Page 1 of 1 ConocoPhillips Alaska,Inc. DAILY WELLSITE REPORT Li EPOCH 2L-304 REPORT FOR GRANVILLE/HABERTHUR DATE Apr 04,2010 DEPTH 9065.00000 PRESENT OPERATION DRILLING TIME 00:55:20 YESTERDAY 7467.00000 24 HOUR FOOTAGE 1598' CASING INFORMATION 10.75"@ 4297' DEPTH INCLINATION AZIMUTH VERTICAL DEPTH SURVEY DATA 8493.50' 72.62 95.48 3645.58' BIT INFORMATION INTERVAL CONDITION REASON NO. SIZE TYPE S/N JETS IN OUT FOOTAGE HOURS T/B/C PULLED 3 9.875" HDBS FXG56S 11410613 3X16,2X17 6407' 18:37 DRILLING PARAMETERS HIGH LOW AVERAGE CURRENT AVG RATE OF PENETRATION 283.2 @ 8394.00000 29.2 @ 8186.00000 140.4 114.26032 FT/HR SURFACE TORQUE @ @ AMPS WEIGHT ON BIT 35 @ 8068.00000 0 @ 8951.00000 9.3 9.20000 KLBS ROTARY RPM @ @ RPM PUMP PRESSURE 5531 @ 8044.00000 5 @ 8186.00000 2437.6 2920.00000 PSI DRILLING MUD REPORT DEPTH 8903' MW 9.7 VIS 55 PV 14 YP 24 FL 3.6 Gels 10/12/18 CL- 400 FC 1/- SOL 8 SD TR OIL 3 MBL 24 pH 9.7 Ca+ 40 CCI MWD SUMMARY INTERVAL TO TOOLS GAS SUMMARY(units) HIGH LOW AVERAGE DITCH GAS 37 @ 8712.00000 5 @ 8343.00000 17.7 TRIP GAS- CUTTING GAS @ @ WIPER GAS- CHROMATOGRAPHY(ppm) SURVEY- METHANE(C-1) 7639 @ 8975.00000 963 @ 8343.00000 3341.0 CONNECTION GAS HIGH 0 ETHANE(C-2) 96 @ 8975.00000 0 @ 8023.00000 36.7 AVG 0 PROPANE(C-3) 0 @ 9065.00000 0 @ 9065.00000 0.0 CURRENT 0 BUTANE(C-4) 0 @ 9065.00000 0 @ 9065.00000 0.0 CURRENT BACKGROUND/AVG 28 PENTANE(C-5) 0 @ 9065.00000 0 @ 9065.00000 0.0 HYDROCARBON SHOWS NO SHOWS THE LAST 24 HOURS INTERVAL LITHOLOGY/REMARKS GAS DESCRIPTION LITHOLOGY SANDSTONE,SILTSTONE,CLAY PRESENT LITHOLOGY 9065'=70%SILT,30%SANDSTONE DAILY ACTIVITY SUMMARY DRILLING FORMATION WITH ROUTINE CONNECTIONS(NO CONNECTION GASES) EPOCH PERSONNEL ON BOARD BROWNE, WINSLOW+2 SC DAILY COST$3235 REPORT BY LEES F. BROWNE JR. file://C:\Documents and Settings\EpochAdmin\My Documents\My Wells\CONOCOPHILIP... 4/4/2010 Daily Report Page 1 of 1 ConocoPhillips Alaska,Inc. DAILY WELLSITE REPORT PI EPOCH 2L-304 REPORT FOR GRANVILLE/HABERTHUR DATE Apr 05,2010 DEPTH 10305.00000 PRESENT OPERATION DRILLING TIME 24 HOURS YESTERDAY 9065.00000 24 HOUR FOOTAGE 1240' CASING INFORMATION 10.75"@ 4297' DEPTH INCLINATION AZIMUTH VERTICAL DEPTH SURVEY DATA 9250' 3872.94 BIT INFORMATION INTERVAL CONDITION REASON NO. SIZE TYPE S/N JETS IN OUT FOOTAGE HOURS T/B/C PULLED 3 9.875" HDBS FX56S 11410613 3X16,2X17 6407' 28 DRILLING PARAMETERS HIGH LOW AVERAGE CURRENT AVG RATE OF PENETRATION 218.8 @ 9576.00000 32.5 @ 9923.00000 134.5 84.49712 FT/HR SURFACE TORQUE @ @ AMPS WEIGHT ON BIT 19 © 9934.00000 0 @ 9921.00000 2.5 0.00000 KLBS ROTARY RPM @ @ RPM PUMP PRESSURE 3479 @ 9922.00000 2259 @ 9196.00000 3041.5 3202.00000 PSI DRILLING MUD REPORT DEPTH 10121' MW 9.7 VIS 54 PV 14 YP 23 FL 3.2 Gels 9/15/19 CL- 450 FC 1/- SOL 9 SD TR OIL 3 MBL 21 pH 9.5 Ca+ 40 CCI MWD SUMMARY INTERVAL TO TOOLS GAS SUMMARY(units) HIGH LOW AVERAGE DITCH GAS 82 @ 9921.00000 5 @ 9275.00000 22.0 TRIP GAS CUTTING GAS @ @ WIPER GAS CHROMATOGRAPHY(ppm) SURVEY SWAB GAS 105 @ 9775' I METHANE(C-1) 14983 @ 9921.00000 903 @ 9275.00000 4059.6 CONNECTION GAS HIGH 65 ETHANE(C-2) 164 @ 10237.00000 9 @ 9923.00000 70.6 AVG 5 PROPANE(C-3) 27 @ 10237.00000 0 @ 9602.00000 3.1 CURRENT 0 BUTANE(C-4) 0 @ 10305.00000 0 @ 10305.00000 0.0 CURRENT BACKGROUND/AVG 20 PENTANE(C-5) 0 @ 10305.00000 0 @ 10305.00000 0.0 I HYDROCARBON SHOWS NO SHOWS THE LAST 24 HOURS INTERVAL LITHOLOGY/REMARKS GAS DESCRIPTION LITHOLOGY SILTSTONE,SANDSTONE,CLAY PRESENT LITHOLOGY 10305'=100%SILTSTONE DRILL FORMATION TO 9921',LOST RETURNS,ATTEMPT TO PULL UP=OVERPULL,ATTEMPT TO SLACK OFF=TOOK WEIGHT,BACK I DAILY REAM STAND AND RACK BACK,PICK UP A DRILL PIPE SINGLE AND ATTEMPT TO PULL(NO GO),WORK PUMPS IN STAGES FROM 4 ACTIVITY SPM/300 PSI=NO RETURNS TO 79 SPM/1120 PSI=30%FLOW,ENGAGE ROATAION AT 30 RPM WITH 9 K TRQ=LOST RETURNS, SUMMARY PICK UP TO 9722'(4014'ND),STAGE UP PUMPS FROM 3 SPM/310 PSI=NO FLOW TO 160 SPM(668 GPM)/3380 PSI=42%FLOW, ENGAGE ROTARY AND REAM STAND AT 100 RPM,CIRCULATE AND CLEAN THE HOLE AND PUMP NUT PLUG SWEEPS AND CHASE OUT,SWAB GAS WAS 105 UNITS AT 9775',DRILL FORMATION TO MIDNIGHT. EPOCH PERSONNEL ON BOARD BROWNE/WINSLOW+2 SC DAILY COST$3235 REPORT BY LEES F. BROWNE JR. file://C:\Documents and Settings\EpochAdmin\My Documents\My Wells\CONOCOPHILIP... 4/5/2010 Daily Report Page 1 of 1 ConocoPhillips Alaska,Inc. DAILY WELLSITE REPORT El EPOCH 2L-304 REPORT FOR GRANVILLE/HABERTHUR DATE Apr 06,2010 DEPTH 10948.00000 PRESENT OPERATION BACK REAM OUT(WIPER) TIME 24 HOURS YESTERDAY 10305.00000 24 HOUR FOOTAGE 643' CASING INFORMATION 10.75"@ 4297' DEPTH INCLINATION AZIMUTH VERTICAL DEPTH SURVEY DATA 10567.37' 72.75 94.41 4264.34' BIT INFORMATION INTERVAL CONDITION REASON NO. SIZE TYPE S/N JETS IN OUT FOOTAGE HOURS T/B/C PULLED 3 9.875" HDBS FX56S 11410613 3X16,2X17 6407' 35 DRILLING PARAMETERS HIGH LOW AVERAGE CURRENT AVG RATE OF PENETRATION 253.2 @ 10505.00000 24.5 @ 10785.00000 111.5 150.07504 FT/HR SURFACE TORQUE @ @ AMPS WEIGHT ON BIT 19 @ 10778.00000 0 @ 10933.00000 5.9 1.40000 KLBS ROTARY RPM @ @ RPM PUMP PRESSURE 3383 @ 10767.00000 2272 @ 10368.00000 3247.2 3317.00000 PSI DRILLING MUD REPORT DEPTH 10948' MW 10.1 VIS 57 PV 16 YP 21 FL 3 Gels 8/18 CL- FC SOL 11.5 SD OIL MBL pH 9.5 Ca+ CCI MWD SUMMARY INTERVAL TO TOOLS GAS SUMMARY(units) HIGH LOW AVERAGE DITCH GAS 84 @ 10603.00000 5 @ 10336.00000 33.3 TRIP GAS- CUTTING GAS @ @ WIPER GAS 135 @ 10948' CHROMATOGRAPHY(ppm) SURVEY- METHANE(C-1) 15276 @ 10603.00000 1041 @ 10336.00000 5956.4 CONNECTION GAS HIGH 0 ETHANE(C-2) 556 @ 10603.00000 21 @ 10336.00000 197.6 AVG 0 PROPANE(C-3) 256 @ 10696.00000 3 @ 10336.00000 54.4 CURRENT 0 BUTANE(C-4) 78 @ 10696.00000 0 @ 10539.00000 10.6 CURRENT BACKGROUND/AVG 12(POOH) PENTANE(C-5) 0 @ 10948.00000 0 @ 10948.00000 0.0 HYDROCARBON SHOWS NO SHOWS THE LAST 24 HOURS/PRESENCE OF C-4'S IN CARBONACEOUS SILTS INTERVAL LITHOLOGY/REMARKS GAS DESCRIPTION LITHOLOGY SILT,CARBONACEOUS SILTSTONE,SHELL FRAGMENTS PRESENT LITHOLOGY 10948'=50%CARBONACEOUS SILTSTONE,50%SILTSTONE DAILY DRILL TO 10948',PUMP NUT PLUG SWEEPS AT 10319,10602 AND 10882',RIG UP TO BACK REAM OUT OF THE HOLE,BACK REAM ACTIVITY FROM 10948'TO 9281',RUN BACK IN THE HOLE ON ELEVATORS,CIRCULATE THE LAST STAND DOWN,WIPER GAS WAS 135 SUMMARY UNITS,BACK REAM OUT OF THE HOLE FROM 10945'TO 8613'WITH MAXIMUM GAS BACK REAMING OUT OF THE HOLE OF 56 UNITS. EPOCH PERSONNEL ON BOARD BROWNE,WINSLOW+2 SC DAILY COST$3235 REPORT BY LEES F. BROWNE JR. file://C:\Documents and Settings\EpochAdmin\My Documents\My Wells\CONOCOPHILIP... 4/5/2010 Daily Report Page 1 of 1 ConocoPhillips Alaska,Inc. DAILY WELLSITE REPORT El EPOCH 2L-304 REPORT FOR GRANVILLE/HABERTHUR DATE Apr 07,2010 DEPTH 10948.00000 PRESENT OPERATION SWAP OUT MUD SYSTEM TIME 24 HOURS YESTERDAY 10948.00000 24 HOUR FOOTAGE 0' CASING INFORMATION 10.75"@ 4297' DEPTH INCLINATION AZIMUTH VERTICAL DEPTH SURVEY DATA 10948 4377' BIT INFORMATION INTERVAL CONDITION REASON NO. SIZE TYPE S/N JETS IN OUT FOOTAGE HOURS T/B/C PULLED 3 9.875" HDBS FX56S 11410613 3X16,2X17 6407' 35 DRILLING PARAMETERS HIGH LOW AVERAGE CURRENT AVG RATE OF PENETRATION @ @ FT/HR SURFACE TORQUE @ @ AMPS WEIGHT ON BIT @ @ KLBS ROTARY RPM @ @ RPM PUMP PRESSURE @ @ PSI DRILLING MUD REPORT DEPTH 10948' MW 9.6(23:30 HRS) VIS 48 PV 14 YP 19 FL 3.4 Gels 7/10 CL- FC SOL 5 SD OIL MBL pH 9.5 Ca+ CCI MWD SUMMARY INTERVAL TO TOOLS GAS SUMMARY(units) HIGH LOW AVERAGE DITCH GAS 55 @ POOH/TIH 0 @ POOH 12 POOH/TIH TRIP GAS- CUTTING GAS @ @ WIPER GAS NO WG BYPASS GAS TRAP CHROMATOGRAPHY(ppm) SURVEY- METHANE(C-1) @ @ CONNECTION GAS HIGH- ETHANE(C-2) @ @ AVG- PROPANE(C-3) @ @ CURRENT- BUTANE(C-4) @ @ CURRENT BACKGROUND/AVG- PENTANE(C-5) @ @ HYDROCARBON SHOWS NO SHOWS THE LAST 24 HOURS.NO ABNORMAL GASSED MUD DURING MUD SWAP OUT INTERVAL LITHOLOGY/REMARKS GAS DESCRIPTION LITHOLOGY PRESENT LITHOLOGY 10948'=50%CARBONACEOUS SILT,50%SILT DAILY BACK REAM FROM 8613'TO 4256',CIRCULATE BOTTOMS UP,MAXIMUM GAS POOH/TIH WAS 55 UNITS,CLEAN THE RIG FLOOR, D ACAILYY CUT AND SLIP NEW DRILL LINE,INSPECT THE TOP DRIVE,WORK ON THE TOP DRIVE,RUN IN THE HOLE WITH BIT FROM 4297'TO SUMMARY 10692',CIRCULATE EVERY 2000'BYPASSING THE GAS TRAP TO OLD PITS,REAM DOWN AND DUMP OLD MUD TO SET UP FOR FLUID TRANSFER SWAP,LINE UP NEW PIT MODULE AND SWAP OUT THE MUD SYSTEM EPOCH PERSONNEL ON BOARD BROWNE, WINSLOW+2 SC DAILY COST$3235 REPORT BY LEES F. BROWNE JR. file://C:\Documents and Settings\EpochAdmin\My Documents\My Wells\CONOCOPHILIP... 4/7/2010 Daily Report Page 1 of 1 ConocoPhillips Alaska,Inc. DAILY WELLSITE REPORT EPOCH 2L-304 REPORT FOR HEIM/CARPENTER DATE Apr 08,2010 DEPTH 12772.00000 PRESENT OPERATION CIRCULATE @ 12772' TIME 24 HOURS YESTERDAY 10948.00000 24 HOUR FOOTAGE 1824' CASING INFORMATION 10.75"@ 4297' DEPTH INCLINATION AZIMUTH VERTICAL DEPTH SURVEY DATA 12079.90' 72.25 96.44 4712.24' BIT INFORMATION INTERVAL CONDITION REASON NO. SIZE TYPE S/N JETS IN OUT FOOTAGE HOURS T/B/C PULLED 3 9.875" HDBS FX56S 11410613 3X16,2X17 6407' 49 DRILLING PARAMETERS HIGH LOW AVERAGE CURRENT AVG RATE OF PENETRATION 812.8 @ 11772.00000 26.4 @ 11736.00000 132.3 140.06148 FT/HR SURFACE TORQUE @ @ AMPS WEIGHT ON BIT 19 @ 10961.00000 0 @ 12367.00000 0.3 0.00000 KLBS ROTARY RPM @ @ RPM PUMP PRESSURE 3317 @ 10948.00000 1309 @ 10950.00000 2823.5 3191.00000 PSI DRILLING MUD REPORT DEPTH 12677' MW 9.6 VIS 41 PV 7 YP 19 FL 4 Gels 7/10/11 CL- 400 FC 1/- SOL 7 SD - OIL 3 MBL 15 pH 9.3 Ca+ 40 CCI MWD SUMMARY INTERVAL TO 1 TOOLS GAS SUMMARY(units) HIGH LOW AVERAGE DITCH GAS 198 @ 11684.00000 6 @ 11941.00000 29.4 TRIP GAS- CUTTING GAS @ @ WIPER GAS 0=BYPASS GAS TRAP @ 10948' CHROMATOGRAPHY(ppm) SURVEY- METHANE(C-1) 54971 @ 12288.00000 167 @ 11942.00000 5245.8 CONNECTION GAS HIGH 10 1 ETHANE(C-2) 2268 @ 12291.00000 8 @ 11942.00000 224.4 AVG 3 PROPANE(C-3) 847 @ 12291.00000 1 @ 10966.00000 83.0 CURRENT 0 BUTANE(C-4) 277 @ 12532.00000 0 @ 11121.00000 26.8 CURRENT BACKGROUND/AVG 26 PENTANE(C-5) 15 @ 12532.00000 0 @ 12004.00000 0.3 HYDROCARBON SHOWS GAS SHOW INTERVAL LITHOLOGY/REMARKS GAS DESCRIPTION 11670 TO 11695' 100%SAND BEFORE 20 MAX 199 AFTER 25 UNCONS,CLEAN,MED LWR TO FINE LWR,TRACE OIL CUT LITHOLOGY SAND,SILT,CLAY,SANDSTONE,TUFFACEOUS SANDSTONE,CARBON SILT PRESENT LITHOLOGY 12772'=40%SILT,50%SAND,10%SANDSTONE DAILY ACTIVITY FINISH DISPLACEMENT OF THE MUD SYSTEM,BYPASS GAS TRAP=0 WIPER GAS,DRILL FORMATION FROM 10947'TO 11770', SUMMARY PUMP A HIGH VISCOSITY SWEEP,WORK ON MUD PUMP#1,DRILL FORMATION TO 12772',PUMP A NUT PLUG SWEEP AND CIRCULATE THE HOLE. EPOCH PERSONNEL ON BOARD BROWNE, WINSLOW+2 SC DAILY COST$3235 REPORT BY LEES F. BROWNE JR. file://C:\Documents and Settings\EpochAdmin\My Documents\My Wells\CONOCOPHILIP... 4/8/2010 Daily Report Page 1 of 1 ConocoPhillips Alaska,Inc. DAILY WELLSITE REPORT U EPOCH 2L-304 REPORT FOR HEIM/CARPENTER DATE Apr 09,2010 DEPTH 13862.00000 PRESENT OPERATION DRILLING TIME 24 HOURS YESTERDAY 12772.00000 24 HOUR FOOTAGE 1090' CASING INFORMATION 10.75"@ 4297' DEPTH INCLINATION AZIMUTH VERTICAL DEPTH SURVEY DATA 13309.37' 62.71 AZI 115.12 5123.45 BIT INFORMATION INTERVAL CONDITION REASON NO. SIZE TYPE S/N JETS IN OUT FOOTAGE HOURS T/B/C PULLED 3 9.875" HDBS FX56S 11410613 3X16,2X17 6407 58 DRILLING PARAMETERS HIGH LOW AVERAGE CURRENT AVG RATE OF PENETRATION 265.8 @ 13750.00000 20.9 @ 13854.00000 132.9 48.03266 FT/HR SURFACE TORQUE @ @ AMPS WEIGHT ON BIT 81 @ 13152.00000 1 @ 12856.00000 0.8 0.00000 KLBS ROTARY RPM @ @ RPM PUMP PRESSURE 3275 @ 12811.00000 2049 @ 13515.00000 3009.5 2657.00000 PSI DRILLING MUD REPORT DEPTH 13770' MW 9.6 VIS 40 PV 7 YP 17 FL 4.2 Gels 6/7/12 CL- 400 FC 1/- SOL 8 SD - OIL 2 MBL 13.75 pH 9.2 Ca+ 40 CCI MWD SUMMARY INTERVAL TO TOOLS GAS SUMMARY(units) HIGH LOW AVERAGE DITCH GAS 91 @ 13250.00000 5 @ 13332.00000 28.3 TRIP GAS- CUTTING GAS @ @ WIPER GAS 33 @ 12772' CHROMATOGRAPHY(ppm) SURVEY- METHANE(C-1) 17741 @ 13236.00000 723 @ 13670.00000 4361.5 CONNECTION GAS HIGH 130 ETHANE(C-2) 1183 @ 13674.00000 28 @ 13020.00000 320.7 AVG 0-5 PROPANE(C-3) 490 @ 13250.00000 16 @ 13020.00000 138.2 CURRENT 0 BUTANE(C-4) 198 @ 13674.00000 0 @ 13029.00000 61.3 CURRENT BACKGROUND/AVG 16 PENTANE(C-5) 70 @ 13728.00000 0 @ 13466.00000 10.6 HYDROCARBON SHOWS NO OIL SHOWS THE LAST 24 HOURS INTERVAL LITHOLOGY/REMARKS GAS DESCRIPTION LITHOLOGY SAND,SANDSTONE,SILTSTONE,CLAY,CARBON SILT PRESENT LITHOLOGY 13860'=70%SILT,20%SANDSTONE,10%SAND DAILY ACTIVITY BACK REAM OUT OF THE HOLE FROM 12772'TO 10947',MONITOR THE WELL FOR 5 MINUTES,RUN IN THE HOLE FROM SUMMARY 10947'TO 12772'AND DRILL FORMATION TO MIDNIGHT EPOCH PERSONNEL ON BOARD BROWNE, WINSLOW+2 SC DAILY COST$3235 REPORT BY LEES F. BROWNE JR. file://C:\Documents and Settings\EpochAdmin\My Documents\My Wells\CONOCOPHILIP... 4/9/2010 Daily Report Page 1 of 1 ConocoPhillips Alaska,Inc. DAILY WELLSITE REPORT El EPOCH 2L-304 REPORT FOR HEIM/CARPENTER DATE Apr 10,2010 DEPTH 14070.00000 PRESENT OPERATION PULL OUT OF THE HOLE TIME 24 HOURS YESTERDAY 13862.00000 24 HOUR FOOTAGE 208' CASING INFORMATION 20.75"@ 4297' DEPTH INCLINATION AZIMUTH VERTICAL DEPTH SURVEY DATA 13975.86' 55.56 146.94 5469.52' BIT INFORMATION INTERVAL CONDITION REASON NO. SIZE TYPE S/N JETS IN OUT FOOTAGE HOURS T/B/C PULLED 3 9.875" HDBS FX56S 11410613 3X16,2X17 6407 63 DRILLING PARAMETERS HIGH LOW AVERAGE CURRENT AVG RATE OF PENETRATION 95.0 @ 13869.00000 16.9 @ 14059.00000 45.0 42.86327 FT/HR SURFACE TORQUE @ @ AMPS WEIGHT ON BIT 35 @ 14070.00000 35 @ 14070.00000 0.2 35.70000 KLBS ROTARY RPM @ @ RPM PUMP PRESSURE 3279 @ 13950.00000 1973 @ 14070.00000 3088.6 1973.00000 PSI DRILLING MUD REPORT DEPTH 14070 MW 9.6 VIS 40 PV 9 YP 19 FL 4 Gels 9/10/12 CL- 400 FC 1/- SOL 8 SD - OIL 4 MBL 15.8 pH 9 Ca+ 40 CCI MWD SUMMARY INTERVAL TO TOOLS GAS SUMMARY(units) HIGH LOW AVERAGE DITCH GAS 275 @ 13963.00000 8 @ 13874.00000 78.1 TRIP GAS- CUTTING GAS @ @ WIPER GAS 67 CHROMATOGRAPHY(ppm) SURVEY- METHANE(C-1) 32214 @ 13963.00000 1105 @ 13874.00000 8608.3 CONNECTION GAS HIGH 60 @ 14008' ETHANE(C-2) 4759 @ 13963.00000 103 @ 13874.00000 1271.1 AVG 0-50 PROPANE(C-3) 2909 @ 14020.00000 47 @ 13874.00000 742.2 CURRENT 60 BUTANE(C-4) 1401 @ 14020.00000 30 @ 13874.00000 354.3 CURRENT BACKGROUND/AVG 0 POOH PENTANE(C-5) 516 @ 14020.00000 13 @ 13874.00000 128.2 HYDROCARBON OIL SHOW SHOWS INTERVAL LITHOLOGY/REMARKS GAS DESCRIPTION 13910'TO 14050' 90-100%SANDSTONE 0-10% BEFORE 40 MAX INCR SAMPLE FLOR FROM 40%TO 80%@ 14040';NO ODOR,NO STAIN, SILTSTONE 275 AFTER 55 SLIGHT TO MODERATE SLOW STREAMING OIL CUTS;2/4 OIL RATING AT BEST LITHOLOGY SANDSTONE,SAND,SILTSTONE PRESENT LITHOLOGY 14070'=20%SILT,10%SAND,70%SANDSTONE DAILY DRILL FORMATION TO 14074',CHANGE OUT#2 MUD PUMP HIGH PSI MUD HOSE,CIRCULATE THE HOLE AND BACK REAM OUT ACTIVITY FROM 14074'TO 12772'AND MONITOR THE WELL,RUN IN THE HOLE FROM 12772'TO 14008',CIRCULATE THE WELL,WIPER GAS SUMMARY WAS 67 UNITS,CHANGE OUT THE SHOCK HOSE AND TEST THE HOSE,BRING UP THE MUD PUMPS AND NOTICE A PSI LOSS, FLOW CHECK THE WELL=SLIGHT FLOW,CHECK AGAIN=DEAD„PULL OUT OF THE HOLE FROM 14008'TO 10131'AT MIDNIGHT. EPOCH PERSONNEL ON BOARD BROWNE,WINSLOW+2 SC DAILY COST$3253 REPORT BY LEES F. BROWNE JR. file://C:\Documents and Settings\EpochAdmin\My Documents\My Wells\CONOCOPHILI... 4/10/2010 Daily Report Page 1 of 1 Conoco Phillips Alaska,Inc. DAILY WELLSITE REPORT El EPOCH 2L-304 REPORT FOR HEIM/CARPENTER DATE Apr 11,2010 DEPTH 14074.00000 PRESENT OPERATION TRIP IN HOLE TO FISH OUT BHA TIME 24 HOURS YESTERDAY 14074.00000 24 HOUR FOOTAGE 0' CASING INFORMATION 10.25"@ 4297' DEPTH INCLINATION AZIMUTH VERTICAL DEPTH SURVEY DATA 13975.86' 55.56 146.94 5469.52' BIT INFORMATION INTERVAL CONDITION REASON NO. SIZE TYPE S/N JETS IN OUT FOOTAGE HOURS T/B/C PULLED 3 9.875" HDBS FX56S 11410613 3X16,2X17 6407 63 DRILLING PARAMETERS HIGH LOW AVERAGE CURRENT AVG RATE OF PENETRATION @ @ FT/HR SURFACE TORQUE @ @ AMPS WEIGHT ON BIT @ @ KLBS ROTARY RPM @ @ RPM PUMP PRESSURE @ @ PSI DRILLING MUD REPORT DEPTH 14074' MW 9.6 VIS 44 PV 10 YP 20 FL 4 Gels 10/12/14 CL- 400 FC 1/- SOL 8 SD - OIL 4 MBL 15.8 pH 9.0 Ca+ 40 CCI MWD SUMMARY INTERVAL TO TOOLS GAS SUMMARY(units) HIGH LOW AVERAGE DITCH GAS - @ - - @ - - TRIP GAS- CUTTING GAS @ @ WIPER GAS- CHROMATOGRAPHY(ppm) SURVEY- METHANE(C-1) @ @ CONNECTION GAS HIGH- ETHANE(C-2) @ @ AVG- PROPANE(C-3) @ @ CURRENT- BUTANE(C-4) @ @ CURRENT BACKGROUND/AVG 0 PENTANE(C-5) @ @ HYDROCARBON SHOWS NO SHOWS THE LAST 24 HOURS/NO DRILLING MUD CIRCULATED INTERVAL LITHOLOGY/REMARKS GAS DESCRIPTION LITHOLOGY PRESENT LITHOLOGY 14074'=10%SAND,20%SILT,70%SANDSTONE DAILY PULL OUT OF THE HOLE FROM 10131'TO 4067',CHECK FOR FLOW=STATIC,CHANGE OUT 5"DRILL PIPE ELEVATORS,LAY DOWN W ACTIVITY W DRILL PIPE FROM 4067'TO 665',STAND BACK HDP,LAY DOWN 2 HDP,LAY DOWN TOP HALF OF COMBO JAR LENGTH,301'OF SUMMARY BHA LEFT IN THE HOLE,CLEAN AND CLEAR THE RIG FLOOR,RIG UP TO TEST BOPE,TEST BOPE,RIG DOWN THE TEST EQUIPMENT,MAKE UP FISHING BHA,RUN IN THE HOLE AND PICK UP DRILL PIPE FROM 367'TO 3487';ZERO MUD LOSSES EPOCH PERSONNEL ON BOARD BROWNE, WINSLOW+2 SC DAILY COST$3253 I REPORT BY LEES F. BROWNE JR. I file://C:\Documents and Settings\EpochAdmin\My Documents\My Wells\CONOCOPHILI... 4/10/2010 Daily Report Page 1 of 1 ConocoPhillips Alaska,Inc. DAILY WELLSITE REPORT EPOCH 2L-304 REPORT FOR HEIM/CARPENTER DATE Apr 12,2010 DEPTH 14074.00000 PRESENT OPERATION POOH W/FISH TIME 24 HOURS YESTERDAY 14074.00000 24 HOUR FOOTAGE 0 CASING INFORMATION 10.75"@ 4297' DEPTH INCLINATION AZIMUTH VERTICAL DEPTH SURVEY DATA 13975.86' 55.56 146.94 5469.52' BIT INFORMATION INTERVAL CONDITION REASON NO. SIZE TYPE S/N JETS IN OUT FOOTAGE HOURS T/B/C PULLED 3 9.875" HDBS FX56S 11410613 3X16,2X17 6407 63 DRILLING PARAMETERS HIGH LOW AVERAGE CURRENT AVG RATE OF PENETRATION @ @ FT/HR SURFACE TORQUE @ @ AMPS WEIGHT ON BIT @ @ KLBS ROTARY RPM @ @ RPM PUMP PRESSURE @ @ PSI DRILLING MUD REPORT DEPTH 14074' MW 9.6 VIS 42 PV 9 YP 20 FL 4 Gels 9/11/12 CL- 400 FC 1/- SOL 8 SD - OIL 4 MBL 16 pH 8.7 Ca+ 40 CCI MWD SUMMARY INTERVAL TO TOOLS GAS SUMMARY(units) HIGH LOW AVERAGE DITCH GAS 117 @ 13776' 1 @ CIRC 55 CIRC ON FISH TRIP GAS 117 @ 13776' CUTTING GAS @ @ WIPER GAS- CHROMATOGRAPHY(ppm) SURVEY- METHANE(C-1) @ @ CONNECTION GAS HIGH- ETHANE(C-2) @ @ AVG- PROPANE(C-3) @ @ CURRENT- BUTANE(C-4) @ @ CURRENT BACKGROUND/AVG 0 PENTANE(C-5) @ @ HYDROCARBON SHOWS NO SHOWS THE LAST 24 HOURS INTERVAL LITHOLOGY/REMARKS GAS DESCRIPTION LITHOLOGY PRESENT LITHOLOGY 14074'=10%SAND,20%SILT,70%SANDSTONE PICK UP DRILL PIPE FROM THE PIPE SHED FROM 3487'TO 3863',RUN IN THE HOLE FROM THE DERRICK FROM 3863'TO 4242',CUT DAILY AND SLIP NEW DRILL LINE,CIRCULATE AT 212 GPM-BYPASSING THE GAS TRAP,RUN IN THE HOLE TO 12265'AND WASH DOWN ACTIVITY FROM 12265'TO 13616',RUN IN THE HOLE AND TAG THE FISH AT 13776',WORK OVER THE FISH=20K OVERPULL,CIRCULATE SUMMARY BOTTOMS UP WITH 117 UNITS OF TRIP GAS,PUMP OUT FIVE STANDS AND PULL OUT TO 3848',FLOW CHECK THE WELL,PULL OUT OF THE HOLE TO 3881'AND LAY DOWN DRILL PIPE FROM 3581'TO 1784'. EPOCH PERSONNEL ON BOARD BROWNE,WINSLOW+2 SC DAILY COST$3253 REPORT BY LEES F. BROWNE JR. file://C:\Documents and Settings\EpochAdmin\My Documents\My Wells\CONOCOPHILI... 4/12/2010 Daily Report Page 1 of 1 ConocoPhillips Alaska,Inc. DAILY WELLSITE REPORT U EPOCH 2L-304 REPORT FOR HEIM/CARPENTER DATE Apr 13,2010 DEPTH 14074.00000 PRESENT OPERATION PULL OUT OF HOLW W/O FISH TIME 24 HOURS YESTERDAY 14074.00000 24 HOUR FOOTAGE 0 CASING INFORMATION 10.75"@ 4297' DEPTH INCLINATION AZIMUTH VERTICAL DEPTH SURVEY DATA 13975.86' 55.56 146.94 5469.52' BIT INFORMATION INTERVAL CONDITION REASON NO. SIZE TYPE S/N JETS IN OUT FOOTAGE HOURS T/B/C PULLED 3 9.875" HDBS FX56S 11410613 3X16,2X17 6407 63 DRILLING PARAMETERS HIGH LOW AVERAGE CURRENT AVG RATE OF PENETRATION @ @ FT/HR SURFACE TORQUE @ @ AMPS WEIGHT ON BIT @ @ KLBS ROTARY RPM @ @ RPM PUMP PRESSURE @ @ PSI DRILLING MUD REPORT DEPTH 14074' MW 9.6 VIS 40 PV 8 YP 18 FL 3.8 Gels 7/8/10 CL- 400 FC 1/- SOL 8 SD - OIL 4 MBL 16 pH 9.0 Ca+ 40 CCI MWD SUMMARY INTERVAL TO TOOLS GAS SUMMARY(units) HIGH LOW AVERAGE DITCH GAS 125 @ TG 15 @ CIRC 23 TRIP GAS 125 CUTTING GAS @ @ WIPER GAS- CHROMATOGRAPHY(ppm) SURVEY- METHANE(C-1) @ @ CONNECTION GAS HIGH- ETHANE(C-2) @ @ AVG- PROPANE(C-3) @ @ CURRENT- BUTANE(C-4) @ @ CURRENT BACKGROUND/AVG 0 PENTANE(C-5) @ @ HYDROCARBON SHOWS NO SHOWS THE LAST 24 HOURS INTERVAL LITHOLOGY/REMARKS GAS DESCRIPTION LITHOLOGY PRESENT LITHOLOGY 14074'=10%SAND,20%SILT,70%SANDSTONE LAY DOWN DRILL PIPE FROM 1784'TO 367',STAND BACK HWDP(DID NOT RECOVER THE FISH),CLEAN THE RIG FLOOR,MAKE UP DAILY OVER SHOT#2,PICK UP DRILL PIPE AND RUN IN THE HOLE FROM 367'TO 4297',MONITOR THE WELL 5 MINUTES,RUN IN THE HOLE ACTIVITY TO 13777'AND TAG THE FISH,WORK OVER AND LATCH ONTO THE FISH,PUMP SLOWLY AT 11 BPM,TRIP GAS WAS 125 UNITS, SUMMARY WORK THROUGH TIGHT HOLE FROM 13333'TO 13137',FISH FELL OFF,RUN IN THE HOLE AND TAG THE FISH AT 13773',ATTEMPT TO LATCH THE FISH,GRAPPLE NOT BITING ONTO THE FISH,MONITOR THE WELL AND PUMP A DRY JOB,PULL OUT OF THE HOLE FROM 13712'TO 5284'WITHOUT THE FISH. EPOCH PERSONNEL ON BOARD BROWNE, WINSLOW+2 SC DAILY COST$3253 REPORT BY LEES F. BROWNE JR. file://C:\Documents and Settings\EpochAdmin\My Documents\My Wells\CONOCOPHILL.. 4/13/2010 Daily Report Page 1 of 1 ConocoPhillips Alaska,Inc. DAILY WELLSITE REPORT HI EPOCH 2L-304 REPORT FOR WHITLOCK/CARPENTER DATE Apr 14,2010 DEPTH 14074.00000 PRESENT OPERATION PULL OUT OF THE HOLE W/O FISH TIME 24 HOURS YESTERDAY 14074.00000 24 HOUR FOOTAGE 0 CASING INFORMATION 10.75"@ 4297' DEPTH INCLINATION AZIMUTH VERTICAL DEPTH SURVEY DATA 13975.86' 55.56 146.94 5469.52' BIT INFORMATION INTERVAL CONDITION REASON NO. SIZE TYPE S/N JETS IN OUT FOOTAGE HOURS T/B/C PULLED 3 9.875" HDBS FX56S 11410613 3X16,2X17 6407' 63 DRILLING PARAMETERS HIGH LOW AVERAGE CURRENT AVG RATE OF PENETRATION @ @ FT/HR SURFACE TORQUE @ @ AMPS WEIGHT ON BIT @ @ KLBS ROTARY RPM @ @ RPM PUMP PRESSURE @ @ PSI DRILLING MUD REPORT DEPTH 14074' MW 9.6 VIS 40 PV 8 YP 18 FL 3.8 Gels 7/8/10 CL- 400 FC 1/- SOL 8 SD - OIL 4 MBL 16 pH 8.7 Ca+ 40 CCI MWD SUMMARY INTERVAL TO TOOLS j GAS SUMMARY(units) HIGH LOW AVERAGE DITCH GAS 84 @ TG 16 @ CIRC 40 TRIP GAS 84 @ 13776' CUTTING GAS @ @ WIPER GAS- CHROMATOGRAPHY(ppm) SURVEY- 1 METHANE(C-1) @ @ CONNECTION GAS HIGH- ETHANE(C-2) @ @ AVG- PROPANE(C-3) @ @ CURRENT- BUTANE(C-4) @ @ CURRENT BACKGROUND/AVG 0 PENTANE(C-5) @ @ HYDROCARBON SHOWS NO SHOWS THE LAST 24 HOURS INTERVAL LITHOLOGY/REMARKS GAS DESCRIPTION LITHOLOGY PRESENT LITHOLOGY 14074'=10%SAND,20%SILT,70%SANDSTONE PULL OUT OF THE HOLE FROM 5289'TO 3394',MONITOR THE WELL,LAY DOWN DRILL PIPE FROM 3394'TO 369',STAND BACK THE DAILY HWDP,BREAK OFF OVERSHOT WITH OUT FISH,CLEAN THE RIG FLOOR,MAKE UP OVER SHOT,PICK UP DRILL PIPE FROM 369'TO ACTIVITY 3394',MONITOR THE WELL,RUN IN THE HOLE AND WORK OVER THE FISH AT 13776',MAKE SEVERAL ATTEMPTS TO SET THE SUMMARY GRAPPLE,GRAPPLE SLIPPING OFF THE FISH,CIRCULATE AND CONDITION WITH TRIP GAS OF 84 UNITS,PUMP A DRY JOB AND PULL OUT OF THE HOLE TO 3205',LAY DOWN DRILL PIPE TO 557'. EPOCH PERSONNEL ON BOARD BROWNE, WINSLOW DAILY COST$2873 W/1 SC REPORT BY LEES F. BROWNE JR. file://C:\Documents and Settin s\E ochAdmin\M Documents\My Wells\CONOCOPHILI... 4/14/2010 g p y y O ... Daily Report Page 1 of 1 ConocoPhillips Alaska,Inc. DAILY WELLSITE REPORT El EPOCH 2L-304 REPORT FOR WHITLOCK/CARPENTER DATE Apr 15,2010 DEPTH 14074.00000 PRESENT OPERATION PULL OUT OF THE HOLE WITH FISH TIME 24 HOURS YESTERDAY 14074.00000 24 HOUR FOOTAGE 0 CASING INFORMATION 10.75"@ 4297' DEPTH INCLINATION AZIMUTH VERTICAL DEPTH SURVEY DATA 13975.86' 55.56 146.94 5469.52' BIT INFORMATION INTERVAL CONDITION REASON NO. SIZE TYPE S/N JETS IN OUT FOOTAGE HOURS T/B/C PULLED 3 9.875" HDBS FX56S 11410613 3X16,2X17 6407' 14074' 7667' 63:50 DRILLING PARAMETERS HIGH LOW AVERAGE CURRENT AVG RATE OF PENETRATION @ @ FT/HR SURFACE TORQUE @ @ AMPS WEIGHT ON BIT @ @ KLBS ROTARY RPM @ @ RPM PUMP PRESSURE @ @ PSI DRILLING MUD REPORT DEPTH MW VIS PV YP FL Gels CL- FC SOL SD OIL MBL pH Ca+ CCI MWD SUMMARY INTERVAL TO TOOLS GAS SUMMARY(units) HIGH LOW AVERAGE DITCH GAS 68 @ TG 1 @ CIRC 40 TRIP GAS 68 @ 13776' CUTTING GAS @ @ WIPER GAS- CHROMATOGRAPHY(ppm) SURVEY- METHANE(C-1) @ @ CONNECTION GAS HIGH- ETHANE(C-2) @ @ AVG- PROPANE(C-3) @ @ CURRENT- BUTANE(C-4) @ @ CURRENT BACKGROUND/AVG 0 PENTANE(C-5) @ @ HYDROCARBON SHOWS NO SHOWS THE LAST 24 HOURS INTERVAL LITHOLOGY/REMARKS GAS DESCRIPTION 1 LITHOLOGY PRESENT LITHOLOGY 14074'=10%SAND,20%SILT,70%SANDSTONE CONTINUE TO LAY DOWN DRILL PIPE FROM 557'TO 369',MONITOR THE WELL FIVE MINUTES,STAND BACK THE HWDP,BREAK OFF DAILY THE OVERSHOT AND GRAPPLE,MAKE UP THE OVERSHOT AND BHA#4,PICK UP DRILL PIPE FROM 375'TO 3211',RUN IN THE HOLE ACTIVITY TO 4250',SLIP AND CUT NEW DRILL LINE AND SERVICE THE TOP DRIVE,RUN IN THE HOLE TO 13776 AND ENGAGE THE FISH AND SUMMARY PUMP OUT SLOWLY,TRIP GAS=68 UNITS,PUMP OUT TO 11534',PULL OUT OF THE HOLE TO THE SHOE,MONITOR THE WELL AND PULL OUT OF THE HOLE TO 3392',PULL OUT AND LAY DOWN DRILL PIPE TO 369'WITH NO MUD LOSSES THE LAST 24 HOURS EPOCH PERSONNEL ON BOARD BROWNE, WINSLOW DAILY COST$2493 REPORT BY LEES F. BROWNE JR. file://C:\Documents and Settings\EpochAdmin\My Documents\My Wells\CONOCOPHILI... 4/15/2010 Daily Report Page 1 of 1 ConocoPhillips Alaska,Inc. DAILY WELLSITE REPORT PI EPOCH 2L-304 REPORT FOR WHITLOCK/CARPENTER DATE Apr 16,2010 DEPTH 14142.00000 PRESENT OPERATION DRILLING TIME 24 HOURS YESTERDAY 14074.00000 24 HOUR FOOTAGE 68' CASING INFORMATION 10.75"@ 4297' DEPTH INCLINATION AZIMUTH VERTICAL DEPTH SURVEY DATA 13975.86' 55.56 146.94 5469.52' BIT INFORMATION INTERVAL CONDITION REASON NO. SIZE TYPE S/N JETS IN OUT FOOTAGE HOURS T/B/C PULLED 3 9.875" HDBSFX56S 11410613 3X16,2X17 6407' 14074' 7667' 63:50 4 9.875" DTX619MB10 122350 6X14 14074 2 DRILLING PARAMETERS HIGH LOW AVERAGE CURRENT AVG RATE OF PENETRATION 59.8 @ 14076.00000 28.1 @ 14101.00000 42.0 36.16964 FT/HR SURFACE TORQUE @ @ AMPS WEIGHT ON BIT @ @ KLBS ROTARY RPM 108 @ 14075.00000 107 @ 14142.00000 107.4 107.00000 RPM PUMP PRESSURE 3256 @ 14074.00000 2540 @ 14104.00000 2847.4 2718.00000 PSI DRILLING MUD REPORT DEPTH 14074' MW 9.7 VIS 40 PV 8 YP 19 FL 3.8 Gels 7/9/11 CL- 400 FC 1/- SOL 7.5 SD - OIL 4 MBL 16 pH 9.3 Ca+ 40 CCI MWD SUMMARY INTERVAL TO TOOLS GAS SUMMARY(units) HIGH LOW AVERAGE DITCH GAS 92 @ 14098.00000 9 @ 14115.00000 26.3 TRIP GAS 65 @ 14074' CUTTING GAS @ @ WIPER GAS CHROMATOGRAPHY(ppm) SURVEY METHANE(C-1) 9460 @ 14074.00000 619 @ 14115.00000 2021.5 CONNECTION GAS HIGH 30 @ 14198' ETHANE(C-2) 2478 @ 14098.00000 213 @ 14115.00000 538.8 AVG 5 PROPANE(C-3) 1279 @ 14098.00000 112 @ 14086.00000 284.8 CURRENT 0 BUTANE(C-4) 514 @ 14098.00000 39 @ 14086.00000 126.4 CURRENT BACKGROUND/AVG 15 PENTANE(C-5) 176 @ 14098.00000 13 @ 14086.00000 42.7 HYDROCARBON SLIGHT OIL SHOW AT 14095' SHOWS INTERVAL LITHOLOGY/REMARKS GAS DESCRIPTION 14095-14100' 90%SILTSTONE,10% BEFORE 25 MAX 90%LIGHT BROWN TO LIGHT GRYISH BRN SILTSTONE WITH HEAVY CLAY AND SANDSTONE 92 AFTER 20 GREASE CONTENT;POSS MUD ADDITIVE 50%DULL LTGRN FLOR MOD SLO MLKY OIL CUT. LITHOLOGY SANDSTONE,SAND,SILTSTONE PRESENT LITHOLOGY 14140'=60%SILTSTONE,40%SANDSTONE DAILY ACTIVITY LAY DOWN FISH,MAKE UP NEW BHA AND BIT,RUN IN THE HOLE TO BOTTOM,HOLE IN GOOD CONDITION,WASH DOWN THE SUMMARY LAST STAND,TRIP GAS WAS 65 UNITS,CONTROL DRILL FORMATION @ 50 FT/HR EPOCH PERSONNEL ON BOARD BROWNE/WINSLOW DAILY COST$2493 REPORT BY LEES F. BROWNE JR. file://C:\Documents and Settings\EpochAdmin\My Documents\My Wells\CONOCOPHILI... 4/16/2010 Daily Report Page 1 of 1 ConocoPhillips Alaska,Inc. DAILY WELLSITE REPORT El EPOCH 2L-304 REPORT FOR WHITLOCK/CARPENTER DATE Apr 17,2010 DEPTH 14340.00000 PRESENT OPERATION PULL OUT OF HOLE WITH BIT TIME 24 HOURS YESTERDAY 14142.00000 24 HOUR FOOTAGE 198' CASING INFORMATION 10.75"@ 4297' DEPTH INCLINATION AZIMUTH VERTICAL DEPTH SURVEY DATA 14340 52.23 148.14 5686.94' BIT INFORMATION INTERVAL CONDITION REASON NO. SIZE TYPE S/N JETS IN OUT FOOTAGE HOURS T/B/C PULLED 4 9.875" DTX619MB10 122350 6X14 14074 14340 266 6:18 DRILLING PARAMETERS HIGH LOW AVERAGE CURRENT AVG RATE OF PENETRATION 70.8 @ 14320.00000 13.4 @ 14340.00000 44.2 13.43400 FT/HR SURFACE TORQUE @ @ AMPS WEIGHT ON BIT @ @ KLBS ROTARY RPM 109 @ 14170.00000 107 @ 14290.00000 108.1 108.00000 RPM PUMP PRESSURE 3019 @ 14211.00000 2543 @ 14170.00000 2902.6 2913.00000 PSI DRILLING MUD REPORT DEPTH 14340' MW 9.5 VIS 42 PV 7 YP 17 FL 3.6 Gels 7/9/11 CL- 400 FC 1/- SOL 7.5 SD - OIL 4 MBL 18 pH 9.1 Ca+ 40 CCI MWD SUMMARY INTERVAL TO TOOLS GAS SUMMARY(units) HIGH LOW AVERAGE DITCH GAS 52 @ 14241.00000 5 @ 14151.00000 20.2 TRIP GAS- CUTTING GAS @ @ WIPER GAS- CHROMATOGRAPHY(ppm) SURVEY- METHANE(C-1) 4993 @ 14239.00000 476 @ 14212.00000 1947.3 CONNECTION GAS HIGH 0 ETHANE(C-2) 1371 @ 14241.00000 107 @ 14151.00000 492.2 AVG 0 PROPANE(C-3) 685 @ 14242.00000 45 @ 14151.00000 283.5 CURRENT 0 BUTANE(C-4) 223 @ 14242.00000 34 @ 14151.00000 122.6 CURRENT BACKGROUND/AVG 0 PENTANE(C-5) 70 @ 14235.00000 11 @ 14151.00000 38.5 HYDROCARBON SHOWS NO SHOWS THE LAST 24 HOURS INTERVAL LITHOLOGY/REMARKS GAS DESCRIPTION LITHOLOGY SANDSTONE,SILTSTONE,CARBONACEOUS SILT PRESENT LITHOLOGY 14340'=70%CARBONACEOUS SILT,30%SILT DAILY ACTIVITY DRILL FORMATION TO 14340'/5686 TVD,CIRCULATE BOTTOMS UP 1.5 TIMES,BACK REAM OUT OF THE HOLE AND MAD PASS SUMMARY FROM 14200'TO 13800',PUMP OUT OF THE HOLE TO 4256',MAXIMUM GAS PUMPING OUT TO 4256'WAS 25 UNITS,CIRCULATE BOTTOMS UP WITH A MAXIMUM GAS OF 25 UNITS. EPOCH PERSONNEL ON BOARD BROWNE, WINSLOW DAILY COST$2493 REPORT BY LEES F. BROWNE JR. file://C:\Documents and Settings\EpochAdmin\My Documents\My Wells\CONOCOPHILI... 4/17/2010 Daily Report Page 1 of 1 ConocoPhillips Alaska,Inc. DAILY WELLSITE REPORT I EPOCH 2L-304 REPORT FOR WHITLOCK/CARPENTER DATE Apr 18,2010 DEPTH 14340.00000 PRESENT OPERATION RUN 7 5/8"CASING TIME 24 HOURS YESTERDAY 14340.00000 24 HOUR FOOTAGE 0 CASING INFORMATION 10.75"@ 4297' DEPTH INCLINATION AZIMUTH VERTICAL DEPTH SURVEY DATA 14340' 52.33 148.14 5686.94' BIT INFORMATION INTERVAL CONDITION REASON NO. SIZE TYPE S/N JETS IN OUT FOOTAGE HOURS T/B/C PULLED DRILLING PARAMETERS HIGH LOW AVERAGE CURRENT AVG RATE OF PENETRATION @ @ FT/HR SURFACE TORQUE @ @ AMPS WEIGHT ON BIT @ @ KLBS ROTARY RPM @ @ RPM PUMP PRESSURE @ @ PSI DRILLING MUD REPORT DEPTH MW VIS PV YP FL Gels CL- FC SOL SD OIL MBL pH Ca+ CCI MWD SUMMARY INTERVAL TO TOOLS GAS SUMMARY(units) HIGH LOW AVERAGE DITCH GAS @ @ TRIP GAS- CUTTING GAS @ @ WIPER GAS- CHROMATOGRAPHY(ppm) SURVEY- METHANE(C-1) @ @ CONNECTION GAS HIGH- ETHANE(C-2) @ @ AVG- PROPANE(C-3) @ @ CURRENT- BUTANE(C-4) @ @ CURRENT BACKGROUND/AVG- PENTANE(C-5) @ @ HYDROCARBON SHOWS NO SHOWS THE LAST 24 HOURS INTERVAL LITHOLOGY/REMARKS GAS DESCRIPTION LITHOLOGY PRESENT LITHOLOGY 14340'=70%CARBONACEOUS SILT,30%SILT DAILY PULL OUT OF THE HOLE AND LAY DOWN DRILL PIPE FROM 4256'TO 854',LAY DOWN THE CIRVCULATING SUB,HWDP,COLLARS ACTIVITY AND PULL THE NUKES AND DOWN LOAD THE MWD.LAY DOWN THE BHA,CLEAN AND CLEAR THE RIG FLOOR,CUT AND SLIP NEW SUMMARY DRILL LINE,CHANGE OUT THE PIPE RAMS TO 7 5/8",TEST THE RAMS,RIG UP TO RUN CASING,REPLACE BULL NOSE FOR THE SHOE,START TO RUN 7 5/8"CASING TO 3097' EPOCH PERSONNEL ON BOARD BROWNE, WINSLOW DAILY COST$2493 REPORT BY LEES F. BROWNE JR. file://C:\Documents and Settings\EpochAdmin\My Documents\My Wells\CONOCOPHILI... 4/17/2010