Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
HOME
EVENTS
DATA
Data List
Drilling
Production
Orders
Data Miner
Document Search
REPORTS
Reports and Charts
Pool Statistics
FORMS
LINKS
Links
Test Notification
Data Requests
Regulations
Industry Guidance Bulletins
How to Apply
ABOUT US
History
Staff
HELP
Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
191-066
Originated: Delivered to:8-Jul-25Halliburton Alaska Oil and Gas Conservation Comm.Wireline & Perforating Attn.: Natural Resource TechnicianAttn: Fanny Haroun 333 West 7th Avenue, Suite 1006900 Arctic Blvd. Anchorage, Alaska 99501Anchorage, Alaska 99518Office: 907-275-2605FRS_ANC@halliburton.comThe technical data listed below is being submitted herewith. Please address any problems orconcerns to the attention of the sender aboveWELL NAME API # SERVICE ORDER # FIELD NAME JOB TYPEDATA TYPE LOGGING DATE PRINTS # DIGITAL # E SET#1 1B-04 50-029-20595-00 910151309 Kuparuk River Plug Setting Record Field- Final 30-Jun-25 0 12 1B-05 50-029-20237-00 910106098 Kuparuk River Multi Finger Caliper Field & Processed 19-Jun-25 0 13 1B-05 50-029-20237-00 910106098 Kuparuk River Plug Setting Record Field- Final 21-Jun-25 0 14 1B-11 50-029-20657-00 910151309 Kuparuk River Multi Finger Caliper Field & Processed 1-Jul-25 0 15 1B-11 50-029-20657-00 910149873 Kuparuk River Plug Setting Record Field- Final 1-Jul-25 0 16 1B-15A 50-029-22465-01 910106169 Kuparuk River Plug Setting Record Field- Final 20-Jun-25 0 17 1D-101 50-029-22988-00 910151308 Kuparuk River Packer Setting Record Field- Final 6-Jul-25 0 18 1H-103 50-029-23593-00 910082841 Kuparuk River Multi Finger Caliper Field & Processed 21-Jun-25 0 19 1L-24 50-029-22170-00 910151023 Kuparuk River Packer Setting Record Field- Final 28-Jun-25 0 110 2A-16 50-103-20042-00 910150862 Kuparuk River Plug Setting Record Field- Final 27-Jun-25 0 1PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING A COPY OF THE TRANSMITTAL LETTER TO THE ATTENTION OF:Fanny Haroun, Halliburton Wireline & Perforating, 6900 Arctic Blvd., Anchorage, AK 99518FRS_ANC@halliburton.comDate:Signed:Transmittal Date:181-065177-001181-136204-256200-183218-003191-066185-147T40642T40643T40643T40644T40644T40645T40646T40647T40648T406497/9/202591L-2450-029-22170-00910151023Kuparuk RiverPacker Setting RecordField- Final28-Jun-2501Gavin GluyasDigitally signed by Gavin Gluyas Date: 2025.07.09 09:29:07 -08'00' Originated: Delivered to:13-Aug-24 Halliburton Alaska Oil and Gas Conservation Comm. Wireline & Perforating Attn.: Natural Resource Technician Attn: Fanny Haroun 333 West 7th Avenue, Suite 100 6900 Arctic Blvd.Anchorage, Alaska 99501 Anchorage, Alaska 99518 Office: 907-275-2605 FRS_ANC@halliburton.com The technical data listed below is being submitted herewith. Please address any problems or concerns to the attention of the sender above WELL NAME API # SERVICE ORDER # FIELD NAME JOB TYPE DATA TYPE LOGGING DATE PRINTS # DIGITAL # E SET# 1 1G-07A 50-029-20872-01 909383029 Kuparuk River Packer Setting Record Field- Final 22-Jul-24 0 1 2 1G-11B 50-029-21008-02 909469734 Kuparuk River Correlation Record ans SBHP Records Field- Final 29-Jul-24 0 1 3 1G-11B 50-029-21008-02 909469734 Kuparuk River SBHP Record Field- Final 29-Jul-24 0 1 4 1G-17 50-029-22945-00 909422685 Kuparuk River Leak Detect Log Field- Final 13-Jul-24 0 1 5 1G-17 50-029-22945-00 909422685 Kuparuk River Multi Finger Caliper Field & Processed 14-Jul-24 0 1 6 1G-17 50-029-22945-00 909422685 Kuparuk River Packer Setting Record Field- Final 13-Jul-24 0 1 7 1L-24 50-029-22170-00: 909422478 Kuparuk River Patch Setting Record Field- Final 6-Jul-24 0 1 8 1Q-04 50-029-21250-00 909422479 Kuparuk River Leak Detect Log Field- Final 10-Jul-24 0 1 9 1Q-04 50-029-21250-00 909422479 Kuparuk River Multi Finger Caliper Field & Processed 10-Jul-24 0 1 10 1Q-09 50-029-21209-00 909422975 Kuparuk River Multi Finger Caliper Field & Processed 19-Jul-24 0 1 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING A COPY OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: Fanny Haroun, Halliburton Wireline & Perforating, 6900 Arctic Blvd., Anchorage, AK 99518 FRS_ANC@halliburton.com Date:Signed: Transmittal Date: 218-051 216-009 199-062 191-066 184-234 184-192 T39436 T39437 T39437 T39438 T39438 T39438 T39439 T39440 T39440 T39441 8-14-2024 Gavin Gluyas Digitally signed by Gavin Gluyas Date: 2024.08.14 08:36:38 -08'00' 71L-24 50-029-22170-00: 909422478 Kuparuk River Patch Setting Record Field- Final 6-Jul-24 0 1 191-066 Originated: Delivered to:9-Jul-24 Halliburton Alaska Oil and Gas Conservation Comm. Wireline & Perforating Attn.: Natural Resource Technician Attn: Fanny Haroun 333 West 7th Avenue, Suite 100 6900 Arctic Blvd. Anchorage, Alaska 99501 Anchorage, Alaska 99518 Office: 907-275-2605 FRS_ANC@halliburton.com The technical data listed below is being submitted herewith. Please address any problems or concerns to the attention of the sender above WELL NAME API # SERVICE ORDER # FIELD NAME JOB TYPE DATA TYPE LOGGING DATE PRINTS # DIGITAL # E SET# 1 1H-10 50-029-22346-00 909358839 Kuparuk River Patch Setting Record Field- Final 27-May-24 0 1 2 1H-104 50-029-23610-00 909292908 Kuparuk River Leak Detect Log with ACX Field & Processed 22-Apr-24 0 1 3 1L-06 50-029-21164-00 n/a Kuparuk River Leak Detect Log Field- Final 7-May-24 0 1 4 1L-06 50-029-21164-00 909298478 Kuparuk River Multi Finger Caliper Field & Processed 8-May-24 0 1 5 1L-06 50-029-21164-00 n/a Kuparuk River Plug Setting Record Field- Final 7-May-24 0 1 6 1L-24 50-029-22170-00 909422478 Kuparuk River Multi Finger Caliper Field & Processed 4-Jul-24 0 1 7 1L-24 50-029-22170-00 909422478 Kuparuk River Patch Setting Record Field- Final 6-Jul-24 0 1 8 1R-35 50-029-23050-00 909353301 Kuparuk River Multi Finger Caliper Field & Processed 29-May-24 0 1 9 2A-14 50-103-20040-00 909382630 Kuparuk River Patch Setting Record Field- Final 13-Jun-24 0 1 10 2B-11 50-029-21089-00 n/a Kuparuk River Plug Setting Record Field- Final 11-May-24 0 1 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING A COPY OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: Fanny Haroun, Halliburton Wireline & Perforating, 6900 Arctic Blvd., Anchorage, AK 99518 FRS_ANC@halliburton.com Date:Signed: Transmittal Date: T39155 T39156 T39157 T39157 T39157 T39158 T39158 T39159 T39160 T39161 193-030 218-084184-133 191-066201-210 185-145184-035 Gavin Gluyas Digitally signed by Gavin Gluyas Date: 2024.07.10 13:13:09 -08'00' 1L-24 50-029-22170-00 909422478 Kuparuk River Multi Finger Caliper Field & Processed 4-Jul-24 0 1 71L-24 50-029-22170-00 909422478 Kuparuk River Patch Setting Record Field- Final 6-Jul-24 0 1 T39158 T39158 84 133 91-06601 210 a 1- 5° iF4 Fa Ef c • ° Y .,.u:.,... a Y la >- fa - al 1--LLI N� op ,- '6 m C7oc) 0 C 0 ° N - > C7 N W ao ra Y ° N a Or m LJ n a C C 0 1_ C a — C 4�> CI t T < O _ W r- r- r r r r r I- a-' a Q 6 0o Q wssmm + p O O aa aa4-, 0 Jai CU N a) N !n N W N W C -C v C O' O N 1� O L CD ° 4-, L C u 'O 03 O Hu Q C 'u O C 4-, u @ ° 1"1C C C C C C C C (13 u 73 N 0 C L a O W J J J J J J J J b!0C ;- 0 ,L- CL W W W W W W W W a U .-- I- LL LL LL LL LL LL LL LLa a) a -0 O _ Q J J J J J J J J Y > L-� ;� CD 1- 0 0 0 Q Q Q Q Q a `, C v- GO O) ZZZZZZZZ a t a ° a LL LL LL LL LL LL LL LL CC ^ 4 4-, > 1 4 O Y > cu 2 .1 a ro> a L O .Q E a; u O °- a) u > U ., C o m FL. Io • G O [ 0. ~ > UCO a o 0 v u Q a a v, C a • L. p O a0 a � a a a a W 0 _ ro a as a 0 0 VD d V g mQ U U a U U On ; ce al 8 011 6tn > il v 41 _ ted o 13 C4 0 • vv www��� z 7 O zco N � W C QO IX CY W IX X 1Y Ce Ce IL w w w w w w w sir W > > > > > > > > ,- z Y Y YYYY YY O daaasQasQ — _ 0. v ' o 03 W ' ` Y Y Y Y Y Y Y Yco O r o CD o M v X �V In in to CO CO O N N C O O O O O O C Wrca, '! O o O O O O O O V O O O O O O O O5 o n n n n 3 CO CO — O 0 0 0 0 0 0 0 < C W .... Q X u ir 0 0 0 0 0 0 0 0 0 ++ O f0 CO 0 0 0 0 0 0 0 0 UQ N- N- M N N F- CO N N ni r CO In CO _ .- - a N N O O o O O = = N N N N N N N N N t S N o, an o6 CO CO CO o6 m c ' 0- RO N N N O O O N N CO 0 0 Q1 O O O O O L u u O O O O O O O O y ..... = O =' comC W In In N In In In LO a '0 o C co w N v u U w x o cc in E E 47 u u Q O r's To p co co a d m .--1 R CD CO ID (O N CO y. C N N Z Pel N O ,- N N N o 4+ In ro ^ J 2 Y Y Y 0 0 0 E n; c• � O- Q Q N r CO N N N N N z N O O • .c ca Ln .--1 ( n f6 N 0 CID a LOQ H a a F F � � • • CU L O Ji ~ T �p o s (i ,' 0 aro v Q W r W 4 > T. c� o v o Y 3 o o 0 N W 00 }-' p > (0 (1 Q o QJ E cu Y C V lig oa-> v _ T a c ° v o a a, c >, co 4, (0 ,c +-, Q 40 0 t U a CO 0 N- n N- n r c- r N- N- N- N N a 0 a _ J _c v U ,,r; V) Q 0 m m a a a a E -a c�_ W Q Q Q Q Q Q Q f/) Ncij N c c u L ami G ~ .- N N N N M M M l() 1!) 0 f0 a"' i C Q U -O (0 0 4- QZ Eu. > E \O v g N O C L ., ro u -0 N O 0 0 0 0 0 0 0 0 0 0 0 C v p L UJ J J J J J J J J J J J C O } W W W W W W W W W W W .V) a 'C U w 1-- LL LL LL LL LL LL LL LL LL LL LL +-, N a1 11 -0 O Q J J J J J J J J J J J O" 'SC ✓ ;� Cf F Q Q Q Q Q Q Q Q Q Q Q Q ^ v- C 0O 0 Z Z Z Z Z Z Z Z Z Z Z v -C C v LL LL LL LL LL LL LL LL LL LL LL ,--, Q > c 1 _ C �r (0 C) > 4-, aJ 1MML Q U C0 in Z E a co_ u 0 C _O w ro _ a) Y3 E' = 0 r a F- v a C aci a °" ° n- >^ G u o) it G 1.ftl C a a LL a a a a J O . a m • - x (�'eD U 44 C :,.. m V co co co co J a = 0 a . N 113 O 0130 \ N CA co U J \ , W M o0 > ro cn iso A! m0 .4 xOr' z 6Y • x(Li CIS `° m w o >, Z d co m � od—c � d � � � � 3 � � 33 4 za CI # 00 o v IP Ix ce CLC4CLW CLCCX CC Ce W W W W W W W W W W W 1 In 7 wWc > > > > > > > > > > > G cectccw w w w w x rcr In z Y Y Y Y Y Y Y Y Y Y Y p DDDDDDDDD Ci _, C4CeC41:eCLCL CLCGCLCCW cu >, CI w < < < < < < < < < < < LL a a a d d d a a a a dt-,s, a W Y Y Y Y Y Y Y Y Y Y Y A . c X N u UtxLao O Le M N M C co Nr U) t0 O .� eV t/) N 0 0 0 )n In In 0In C co W U 4 O O O O O O O O o o 0 6) ^• 0 O O O O O O O O O O O N � � MMA666 . . 0 0 co x x x o 0 0 0 0 C 0O y Li, (n v 2 3 3 cn cn cn cn cn (0 W 0 0 0 O O 0 O O O O O as W cn < x VIu win it 0o 0 0 0 0 0 0 0 0 0 CC to 0 0 0 0 0 0 0 0 0 0 0to N.4. o o (0 v o v o )n yr C co t0 N to 03 N- t0 03 to )n L 0 M N M N CD (0 03 .1 in (0 (0 C U N M M e- N N C) 0 0 N N N NN N NN N N N N 4 j� 0) 0) CA to 0) 0) O) O) 61 0) O) al vi R N N N N N N N N N N N L 01 0 0 0 00 0 o O O O O L 0 0 0 0 0 0 0 O O oo 0 cu r. co C to to to to to to U (0 0 N to O_.. u ▪ W a! (9 a1 09a. z01 E v > U a7 w x w CC C 'C V C Q N 00 03 N C0 Q1 7 d N = z N oD .-i z oow N N o ,2 0 0 +-, E aJ N rn (o h. a A 1 E v) (c n J di 6 Y Y J LL 2 m m £ Z CV o _ �_ d Q Q N ..../ M M M r M NVI Y N u O C d 3 4 it d` E. Q 0 5 AUG 0 3 2016 STATE OF ALASKA � � ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG la.Well Status: Oil❑ Gas❑ SPLUG❑ Other ❑ Abandoned L ' Suspended❑ 1b.Well Class: 20AAC 25.105 20AAC 25.110 Development 0 , Exploratory❑ GINJ ❑ WINJ❑ WAGE WDSPL❑ No.of Completions: Service ❑ Stratigraphic Test❑ 2.Operator Name: 6. Date Comp.,Su p., r 14. Permit to Drill Number/ Sundry: ConocoPhillips Alaska, Inc. Aband.:•�., 191-066/316-187/ 3.Address: 7. Date Spudded: jG f l 13/ I j 15.API Number: P.O. Box 100360 Anchorage,AK 99510-0360 5/14/1991 VT'- 50-029-22170-00 4a. Location of Well(Governmental Section): 8.Date TD Reached: 16.Well Name and Number: Surface: 567'FNL, 143'FEL,Sec 31,T11 N, R10E, UM 5/21/1991 KRU 1L-24 i Top of Productive Interval: 9. Ref Elevations: KB:130 17.Field/Pool(s): 1309'FNL, 1129'FEL,Sec 6,T1ON, R10E, UM GL:87 BF: Kupurak River Field/Kuparuk Oil Pool Total Depth: 10. Plug Back Depth MD/TVD: 18. Property Designation: 1699'FNL, 1163'FEL,Sec 6,T1ON, R10E, UM 8593/5875 ' • ADL 25664 4b. Location of Well(State Base Plane Coordinates, NAD 27): 11.Total Depth MD/TVD: 19. Land Use Permit: Surface: x- 539925 y- 5948401 Zone- 4 9241/6286 - ALK 473 TPI: x- 538992 y- 5942375 Zone- 4 12.SSSV Depth MD/TVD: 20.Thickness of Permafrost MD/TVD: Total Depth: x- 538961 y- 5941985 Zone- 4 N/A 1500/1318 5.Directional or Inclination Survey: Yes ❑ (attached) No 2 13.Water Depth, if Offshore: 21. Re-drill/Lateral Top Window MD/TVD: Submit electronic and printed information per 20 AAC 25.050 N/A (ft MSL)I N/A 22. Logs Obtained: List all logs run and,pursuant to AS 31.05.030 and 20 AAC 25.071,submit all elesaggiGhlakirtrintrprIlitrdTOFWithin 90 days of completion,suspension,or abandonment,whichever occurs first.Types of logs to be listed include,but are not limited to:mud log,spontaneous potential, gamma ray,caliper, resistivity,porosity, magnetic resonance,dipmeter,formation tester,temperature,cement evaluation,casing collar locator,jewelry,and perforation record. Acronyms may be used.Attach a separate page if necessary NONE 23. CASING,LINER AND CEMENTING RECORD WT. PER SETTING DEPTH MD SETTING DEPTH TVD '' AMOUNT CASING FT. GRADE TOP BOTTOM TOP BOTTOM HOLE SIZE CEMENTING RECORb PULLED 16 62.5 H-40 44 122 44 122 24 235 sx AS 1 9 5/8 36 J-55 43 5081 43 3610 12 1/4 750 sx Type E,550 sx ClassG 7 26 J-55 28 9241 28 6287 8 1/2 250 sx ClassG Perm 24.Open to production or injection? Yes ❑ No 2 25.TUBING RECORD If Yes, list each interval open(MD/TVD of Top and Bottom;Perforation SIZE DEPTH SET(MD) PACKER SET(MD/TVD) Size and Number): 3 1/2 8655 8386/5741,8491/5809 A6,403ppN)e0 8604/5882 J �a t r- 171. ht+'8 r 26.ACID, FRACTURE,CEMENT SQUEEZE, ETC. b G `)ATE Was hydraulic fracturing used during completion? Yes❑ No 0 w 1 1311 j.f, —1'1-4. 1.%-e"4" Per 20 AAC 25.283(i)(2)attach electronic and printed information `F R'FIF F' DEPTH INTERVAL(MD) AMOUNT AND KIND OF MATERIAL USED 27. PRODUCTION TEST Date First Production: Method of Operation(Flowing,gas lift,etc.): N/A Date of Test: Hours Tested: Production for Oil-Bbl: Gas-MCF: Water-Bbl: Choke Size: Gas-Oil Ratio: Test Period Flow Tubing Casing Press: Calculated Oil-Bbl: Gas-MCF: Water-Bbl: Oil Gravity-API(corr): Press. 24-Hour Rate Form 10-407 Revised 11/2015 erj V`77 �/3 1 /l ICYO�Ni IN�U DJON PAGE 2 RBDMS —'AUG - 1 2016 Submit ORIGINIAL only III • 28.CORE DATA Conventional Core(s): Yes ❑ No LI Sidewall Cores: Yes E No E If Yes, list formations and intervals cored(MD/TVD, From/To),and summarize lithology and presence of oil,gas or water(submit separate pages with this form, if needed).Submit detailed descriptions,core chips, photographs,and all subsequent laboratory analytical results per 20 AAC 25.071. 29. GEOLOGIC MARKERS (List all formations and markers encountered): 30. FORMATION TESTS NAME MD ND Well tested? Yes ❑ No ❑ Permafrost-Top Surface Surface If yes, list intervals and formations tested,briefly summarizing test results. Permafrost-Base 1500 1318 Attach separate pages to this form, if needed;and submit detailed test Top of Productive Interval n/a n/a information,including reports,per 20 AAC 25.071. Formation at total depth: n/a 31. List of Attachments: Daily Operations Summary, Definitive Survey,Schematics Information to be attached includes,but is not limited to:summary of daily operations,wellbore schematic,directional or inclination survey,core analysis, paleontological report.production or well test results. ger 20 AAC 25.070. 32. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact: Jason Burke A 265-6097 Email: Jason.Burkeacop.com Printed Name: G. Eller Title: CTD ENGINEERING SUPRV Signature: rN..-kPhone: 263-4172 Date: %I Z—i,� INSTRUCTIONS , General: This form and the required attachments provide a complete and concise record for each well drilled in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed.All laboratory analytical reports regarding samples or tests from a well must be submitted to the AOGCC,no matter when the analyses are conducted. Item 1 a: Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. Item 1b: Well Class-Service wells:Gas Injection,Water Injection,Water-Alternating-Gas Injection,Salt Water Disposal,Water Supply for Injection, Observation,or Other. Item 4b: TPI(Top of Producing Interval). Item 9: The Kelly Bushing,Ground Level,and Base Flange elevations in feet above Mean Sea Level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. Item 15: The API number reported to AOGCC must be 14 digits(ex:50-029-20123-00-00). Item 20: Report measured depth and true vertical thickness of permafrost. Provide MD and ND for the top and base of permafrost in Box 29. Item 22: Review the reporting requirements of 20 AAC 25.071 and,pursuant to AS 31.05.030,submit all electronic data and printed logs within 90 days of completion,suspension,or abandonment,whichever occurs first. Item 23: Attached supplemental records should show the details of any multiple stage cementing and the location of the cementing tool. Item 24: If this well is completed for separate production from more than one interval(multiple completion),so state in item 1,and in item 23 show the producing intervals for only the interval reported in item 26.(Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Item 27: Method of Operation: Flowing,Gas Lift,Rod Pump,Hydraulic Pump,Submersible,Water Injection,Gas Injection,Shut-in,or Other(explain). Item 28: Provide a listing of intervals cored and the corresponding formations,and a brief description in this box. Pursuant to 20 AAC 25.071,submit detailed descriptions,core chips,photographs,and all subsequent laboratory analytical results, including, but not limited to:porosity, permeability,fluid saturation,fluid composition,fluid fluorescence,vitrinite reflectance,geochemical,or paleontology. Item 30: Provide a listing of intervals tested and the corresponding formation,and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Item 31: Pursuant to 20 AAC 25.070,attach to this form:well schematic diagram,summary of daily well operations,directional or inclination survey,and other tests as required including,but not limited to:core analysis,paleontological report,production or well test results. Form 10-407 Revised 11/2015 Submit ORIGINAL Only KUP D 1 L-24 ConocoPhiHl1ps m Well Attribu Max Angle D TD Pdea91Kii If1t: Wellbore APIIUWI Field Name Wellbore Status ncl(°) MD(ftKB) Act Btm(ftKB) caragoVhdlos 500292217000 KUPARUK RIVER UNIT PROD 53.31 4,700.00 9241.0 Comment H2S(ppm) Date Annotation End Date KB-GM(ft) Rig Release Date 1L-24,.7/29/20168.46:00 AM SSSV:NONE 60 8/2/2015 Last WO: 12/17/2013 J 42.99 5/23/1991 Vertical;schemauc.(ecNel) Annotation Depth(ftKB) End Date Annotation Last Mod By End Date Last Tag:SLM 8,903.0 3/31/2016 Rev Reason:GLV C/O pproven 7/21/2016 HANGER;39.2 .-Ati iii Casing Strings Casing Description OD(in) ID(in) Top(ftKB) Set Depth(ftKB) Set Depth(ND)... Wt/Len(I...Grade Top Thread I,,,,CONDUCTOR 16 15.062 44.0 122.0 122.0 62.50 H-00 WELDED 11 Casing Description OD(in) ID(in) Top(ftKB) Set Depth(ftKB) 'Set Depth(TVD)...Wt/Len(I...Grade Top Thread L ., SURFACE 95/8 8.921 43.0 5,081.2 3,610.2 36.00 J-55 BTC Casing Description SOD(in) ID(in) Top(ftKB) Set Depth(ftKB) Set Depth(ND)...Wt/Len(I...Grade Top Thread PRODUCTION 7 6.276 28.3 9,240.9 6,286.8 26.00 J-55 BTC-MOD Tubing Strings Tubing Description String Ma...ID(in) Top(ftKB) Set Depth(ft..Set Depth(ND)(...Wt(Ib/ft) Grade Top Connection -e,-ti CONDUCTOR;44.0-122.0-/v" 'TUBING WO 2013 31/2 2.992 39.2 8,464.4 5,791.9 9.30 L-80 EUE-m Completion Details GAS LIFT;3,338.6 Nominal ID Top(ftKB) Top(ND)(ftKB) Top Incl(') Item Des Com (in) 39.2 39.2 0.08 HANGER FMC Gen IV TUBING HANGER 2.992 8,355.3 5,721.4 49.72 LOCATOR BAKER LOCATOF2 SUB 2.990 8,356.3 5,722.0 49.72 SEAL ASSY BAKER SEAL ASSY-Space out above PBR locator sub 2.990 "Actual space our 7.08'locator above PBR GAS LIFT;4,994.3 Zit 8,363.4 5,726.6 49.72 PBR BAKER 80-40 POLISH BORE RECEPTACLE 40,000 4.000 Shear force 8,385.8 5,741.1 49.72 PACKER BAKER FHL RETRIEVABLE PACKER 60,000 PSI Shear 2.930 SURFACE;43.05,081.2 ' Release 8,438.5 5,775.2 49.75 NIPPLE CAMCO"DS"NIPPLE 2.875" 2.875 8,456.1 5,786.6 49.76 OVERSHOT BAKER POORBOY OVERSHOT 6"OD x 3.62"ID 3.000 Swallowed 6.84'of tbg LIFT;8,219.9 j.., a.�. 9 stub. Tubing Description String Ma...ID(in) Top(ftKB) Set Depth(ft...Set Depth(ND)(...Wt(Ib/ft) Grade Top Connection TUBING WO-2004 3 1/2 2.992 8,457.6 8,602.3 5,880.9 9.30 J-55 EUE AB MOD Completion Details GAS LIFT,7,199.4 ''iI. Nominal ID al Top(ftKB) Top(ND)(ftKB) Top Incl Cl Item Des Com (in) 8,476.0 5,799.4 49.78 SEAL ASSY BAKER 80-40 SEAL ASSEMBLY 2.980 el8,477.3 5,800.2 49.78 PBR BAKER 80-40 PBR 2.980 GAS LIFT,7,870 9 8,491.0 5,809.1 49.79 PACKER BAKER FHL PACKER 2.930 21, 8,572.5 5,861.6 49.89 NIPPLE CAMCO DS NIPPLE WITH 2.72"NO-GO 2.812 8,589.6 5,872.6 49.92 SEAL ASSY TIW SEAL ASSEMBLY/PBR,STABBED INTO EXISTING 3.000 PBR GAS LIFT,8,299.3_ _ Tubing Description String Ma...ID(in) Top(ftKB) Set Depth(ft..Set Depth(ND)(...Wt(lb/ft) Grade Top Connection TUBING-Original 3112 2.992 8,590.9 8,654.61 5,914.4 9.30 J-55 EUE8r4ABMOD Completion Details art Nominal ID LOCATOR;8,355.3 IL Top(ftKB) Top(ND)(ftKB) Top Incl(1 Item Des Com (in) SEAL ASSY;8,356.3 :__: 8,590 5,873.5 49.92'PER TIW PBR w/10'STROKE 3.000 PBR;8,383.4 8,603.7 5,881.7 49.94 PACKER TIW HM-1 RETRIEVABLE PACKER 3.500 PACKER;8,385.8 8,621.0 5,892.9 49.98 NIPPLE CAMCO D NIPPLE NO GO 2.800 8,653.6' 5,913.8 50.06 SOS TIW SHEAR OUT SUB 3.015 Other In Hole(Wireline retrievable plugs,valves,pumps,fish,etc.) NIPPLE;64385 `:377: Top(TVD) Top Incl IF Top(ftKB) (ftKB) (°) Des Com Run Date ID(in) 8,874.0 6,054.6' 50.53 Whipstock Baker 3.5"Whipstock XL Tray with OH Anchor 6/13/2016 OVERSHOT,8,456.1 jal Perforations&Slots Shot Dens SEAL ASSY;8,478.0Top(TVD) Btm)TVD) (shots/ Top(ftKB) Btm(ftKB) (ftKB) (ftKB) Zone Date ft) Type Com PBR;6,477.3-1:r ii 8,735.0 8,782.0 5,966.0 5,996.0 C-4,1 L-24 8/20/1991 6.0 IPERF 21/8"Flow Jet Stri;0 PACKER;8,491.0- deg.ph € 8,920 0 8949.0 6,083.8 6,102.2 A-5,1L-24 6/18/1991 4.0 IPERF 4.5"Carder;180 deg.ph NIPPLE;8,572.5 9,010.0 9,029.0 6,141.0 6,153.0 A-4,1L-24 6/18/1991 4.0 IPERF 4.5"Carrier;180 deg.ph Cement Squeezes SEAL ASSY;8,588.8 Top(ND) Btm(ND) Top)ftKB) Btm(ftKB) (ftKB) (ftKB) Des Start Date Com PBR;ase°a _a 8,905.0 8,964.0 6,074.3 6,111.8 PLUG THEN 4/28/2016 HARD TAG AT 8967 MILLED PACKER;8,603.7 ,_. 8,735.0 8,949.0 5,966.0 6,102.2 CEMENT 4/28/2016 RI SQUEEZE i' Mandrel Inserts St NIPPLE;8,621.0 i f.. ati . 1 on Top(TVD) Valve Latch Port size TRO Run _j N Top(ftKB) (ftKB) Make Model OD(in) Sew Type Type (in) (psi) Run Date Com SOS;8,653.6 j; :Z' 1 3,338.6 2,496.9 CAMCO MMG 11/2 GAS LIFT GLV RK 0.188 1,322.0 7/17/2016 (PERF;8,735.0-8,782.0 ° 2 4,994.3 3,549.7 CAMCO MMG 11/2 GAS LIFT GLV RK 0.188 1,278,0 7/17/2016 3 6,219.9 4,344.4 CAMCO MMG 1 1/2 GAS LIFT GLV RK 0.188 1,254.0 7/17/2016 CEMENT SQUEEZE;8,7�, 1 + 4' 7,199.5 4,959.4 CAMCO MMG 1 1/2 GAS LIFT GLV RK 0.188 1,232.0 7/16/2016 AL1 LATERAL LINER;8,613.9- 4 5 7,870.9 5,403.2 CAMCO MMG 11/2 GAS LIFT GLV RK 0.188 1,212.0 7/16/2016 11,588.0 .r + 6 8,299.3 5,685.2 CAMCO MMG 1 1/2 GAS LIFT OV RK 0.188 0.0 7/16/2016 Whipstock;8,874.0 S°� j s Notes:General&Safety >ziftv.VISTA. End Date Annotation li .ftIPERF;8,920.0-8,90.9.0 'li; 6/12/2004 NOTE WORKOVER i,.iiiiii;iiiiiQ”k .,vim 6/12/2004 NOTE:TREE CAP CONNECTION:3" Cement Squeeze then Mill Out; ,. 6/12/2004 NOTE:TREE:CAMERON/GEN 5/3-1/8"/5000 psi 8,905.0 ftKB 7/13/2016 NOTE:CTD CEMENT PILOT HOLE EXIT (PERF;9,010E-9,029.0---. I I PRODUCTION,28.3-9,240.9 i [ • • MOM 1L-24 CTD Schematic ` by K` 3-1/2"9.3#J-55 EUE 8rd Tubing to surface 16"62#H-40 shoe @ _ — 3-1/2"Camco MMG gas lift mandrel @ 3339',4994',6220',7200',7871', 122'MD 8299'RKB 9-5/8"36#J-55 shoe @ Baker 80-40 PBR @ 8363'RKB(4.0"ID) 5081'MD Baker FHL packer @ 8386'RKB(2.93"ID) 3-1/2"Camco DS nipple @ 8439'RKB(2.875"min ID) Baker Poorboy Overshot @ 8456'RKB(3.00"min ID) • Baker 80-40 PBR @ 8477'RKB(2.98"ID) Baker FHL packer @ 8491'RKB(2.93"ID) 3-1/2"Camco DS nipple @ 8573"RKB(8568'PDC)(2.812"min ID) TIW Seal Assy @ 8590'RKB(3.00"ID) TIW PBR @ 8591'RKB(3.00"ID) TIW HM-1 Retrievable Packer @ 8604'RKB(8598'PDC) ......................--- ' 3-1/2"Camco D nipple @ 8621'RKB(8616'PDC)(2.80"min ID) 11111, 3-1/2"SOS @ 8654'RKB;8649'PDC) 2-3/8'Baker Seal Bore Deployment Sleeve at 8614'MD C-sand perfs 1L-24AL1(A5 sand-Northwest) 8735'-8782'MD TD @ 11609'MD TOL at 8614'MD and BOL at 11588'MD 2-3/8"solid liner 8620'-8947'MD 2-3/8"slotted liner 8947'-11588'MD KOP @ 8874'PDC 1L-24APB1(AS sand-Southeast) A-sand perfs TO @ 11610'MD 8920'-8949'MD - Openhole anchor @ 10258'MD 9010'-9029'MD ' 1L-24A(A5 sand-Southeast) 1 L-24AL7-02(A5 sand-Southeast) TD @ 11690'MD BOL @ 10299 MD TD @ 12259'MD BOL @ 12190'MD Openhole anchor @ 9850'MD 7"269 J-55 shoe @ 9241' Openhole anchor at 8970'MD MD 1L-24AL1-02PB1(A5 sand-Southeast) TD @12310'MD Openhole anchor @ 10420'MD o III • .M' -*-- ConocoPhillips Well History 1L-24 : 500292217000 : 8/2/2016 ate Event 7/17/2016 RAN LIB TO STA#3 @ 6219' RKB GOOD CHINA CAP, PULLED DV WITH SPLIT SKIRT JD LATCH HAD POSSIBLE TRASH, PULL DV @ 3338' RKB, SET GLV'S @ 3338', 4994' & 6219' RKB, GOOD DRAW DOWN ON IA, PULLED 2.81 CAT STANDING VLV @ 8532' RKB. COMPLETE. 7/16/2016 SET 2.81 CAT STANDING VLV @ 8572' RKB, PULLED DV's @ 8299', 7870', 7199', & 4994' RKB, SET OV @ 8299' RKB, SET GLV'S @ 7870' & 7199' RKB, ATTEMPT TO PULL DV @ 6219' RKB UNABLE TO LATCH VLV POSSIBLE BENT LATCH OR TRASH. IN PROGRESS. 07/15/2016 TAG LINER TOP @ 8613' RKB WITH 2.68" GAUGE & 3 1/2 BLB, MEASURED BHP @ 8613' RKB (3274 PSI). JOB POSTPONED DO TO 40 MPH WINDS. 05/04/2016 (Pre CTD) TREE VALVE TEST POSITIVE MV PASSED SSV PASSED SV PASSED NEGATIVE MV PASSED SSV PASSED SV PASSED 05/02/2016 TAG TOP OF CEMENT @ 8568' SLM& PRESSURE TEST TO 2000 PSI (PASS-LOST 50 PSI IN 15 MIN.) READY FOR DHD. 04/28/2016 LAY IN 35 BBLS OF 16.5# CLASS G CEMENT (25 BBLS WITH 1 PPG CEM-NET FIBER) FROM 8937' CTMD TO 5878' CTMD, PERFORM 7 HESITATION SQUEEZES BEFORE WE ARE ABLE TO GET THE WHP TO HOLD A SOLID 1500 PSI FOR 30 MINUTES, CONTAMINATE CEMENT TO 8626' CTMD WITH POWER-VIS GEL, FCO CONTAMINATED CEMENT TO SURFACE WHILE WASHING JEWELERY ON THE WAY OOH, F/P TBG TO 8626' CTMD, ALLOW 72 HRS TO CURE BEFORE S/L P/T AND TAG, JOB COMPLETE. 04/27/2016 CIRCULATE 1.5 WELLBORE VOLUMES OF SLICK DIESEL, PUMP 35 BBLS OF 16.5# CLASS G CEMENT (25 BBLS WITH 1.5 PPB CEM-NET FIBER), LAY IN CEMENT FROM 8960' RKB TO TBG TAIL AT 8650' RKB, CLOSE CHOKE AND UNABLE TO BUILD ADEQUATE SQUEEZE PRESSURE, PERFORM 6 HESITATION SQUEEZES WAITING 20 MINUTES ON EACH, FINAL WHP WAS ONLY 900 PSI, DROP A BALL AND CONTAMINATE CEMENT JOB DOWN TO 8935" RKB AND CHASE OOH AT 70%, F/P TBG TO 3000' RKB, RETURN IN AM TO PUMP A SECOND BATCH, JOB IN PROGRESS. 04/26/2016 RIH WITH BAKER LEFT HAND MOTOR AND 2.80" STEP MILL, DRY TAG NIPPLE AT 8582' RKB, FLAG PIPE, MILL NIPPLE AND DRY DRIFT 2 TIMES, F/P TBG TO 3000' TVD, JOB IN PROGRESS. C1 /24/2016 INJECTIVITY TEST, ESTABLISH PRESSURES STABILIZATION AT .5 BPM, 1 BPM, AND 1.5 BPM PUMPING DIESEL DOWN THE TUBING. JOB COMPLETE. 0 /20/2016 PUMPED 30 BBLS DSL DWN TBG FOR INJECTIVITY TEST (JOB IN PROGRESS) D /19/2016 PERFORATE 8619' - 8621' WITH 2" 3 SPF 120 DEG PHASED BIG HOLE CHARGES. CCL TO TOP SHOT 7.5' CCL STOP AT 8611.5'. 04/03/2016 PULLED CATCHER& 2.875" CSA-2 PLUG @ 8438' RKB. READY FOR E/L. IN PROGRESS. 04/02/2016 CIRC OUT TBG X IA W/226 BBLS CRW SW FOLLOWED BY 92 BBLS DSL (U-TUBE FP); SET DV @ 7871' RKB. LRS ON MITT& MITIA (BOTH PASSED). IN PROGRESS. 04/01/2016 SET BAITED P/T ON CSA-2 PLUG @ 8438' RKB; PULLED GLV'S @ 7200', 6220', 4994', & 3339' RKB. SET DV'S @ SAME. PULLED OV @ 7871' RKB (READY FOR CIRC OUT). IN PROGRESS. D1/31/2016 TAG FILL @ 8903' SLM(EST. 86' OF FILL) & MEASURE BHP (2742 PSI) @ 8875' RKB; BRUSH n' FLUSH TBG DOWN TO DS NIPPLE @ 8438' RKB; SET 2.875 CSA-2 PLUG @ SAME. IN PROGRESS. 01/23/2016 (PRE-CTD) : POT-T (PASSED), PPPOT-T (PASSED), POT-IC (PASSED), PPPOT-IC (PASSED), MIT-OA (PASSED) TO 1800 PSI, SI TIFL (PASSED). • • .. 4' Operations Summary (with Timelog Depths) IL-24 Conacol'hiilips Rig: NABORS CDR2-AC Job: DRILLING SIDETRACK Time Log Start Depth Start Time End Time Dur(hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth(ftKB) 6/7/2016 6/7/2016 1.00 MIRU MOVE RURD P Complete rig down check list. 0.0 0.0 00:00 01:00 6/7/2016 6/7/2016 0.50 MIRU MOVE SFTY P PJSM with Peak and Nabors crews. 0.0 0.0 01:00 01:30 6/7/2016 6/7/2016 1.00 MIRU MOVE MOB P Jack up pits and pull away from sub, 0.0 0.0 01:30 02:30 soft pad,trouble with truck,call Peak mechanic,using CAT to assist staging pits 6/7/2016 6/7/2016 2.00 MIRU MOVE MOB T Peak truck broke down backing pits in 0.0 0.0 02:30 04:30 soft pad,wait on mechanic another Peak truck,prep well cellar,fill in ruts on pad with scraper,housekeeping around rig.. 6/7/2016 6/7/2016 1.00 MIRU MOVE MOB P Peak on site.PJSM,move pits back 0.0 0.0 04:30 05:30 further back out of the way.Pull sub from 1L-13A with CAT assist. 6/7/2016 6/7/2016 2.00 MIRU MOVE MOB P Spot sub over 1L-24 with CAT assist, 0.0 0.0 05:30 07:30 lay mats,set down. 6/7/2016 6/7/2016 1.25 MIRU MOVE MOB P Spot Pits with CAT assist 0.0 0.0 07:30 08:45 6/7/2016 6/7/2016 1.25 MIRU MOVE RURD P Perform rig up checklist complete 0.0 0.0 08:45 10:00 6/7/2016 6/7/2016 1.50 MIRU MOVE NUND P Nipple up BOPE,change out riser, 0.0 0.0 10:00 11:30 check torque on flange bolts(30 min) good. 6/7/2016 6/7/2016 1.50 MIRU MOVE RURD P Perform pre spud check list,circulate 0.0 0.0 11:30 13:00 surface lines,body test BOPE 4,000 psi. Rig Accept at 13:00 on 06/07/2016 6/7/2016 6/7/2016 2.50 MIRU WHDBOP CTOP P Prepand load coil,perform slack 0.0 0.0 13:00 15:30 management,25'until wire found. 6/7/2016 6/8/2016 8.50 MIRU WHDBOP CTOP P Rig up coil tubing cutter,cut 1,480 ft 0.0 0.0 15:30 00:00 coil,pump slack back,no movement, cut additional 20 ft for 1,500 total coil tubing cut.Test cable.LD cutter,clear floors,get RKB's. 6/8/2016 6/8/2016 2.50 MIRU WHDBOP RURD P Fluid pack stack,prep for BOPE test. 0.0 0.0 00:00 02:30 6/8/2016 6/8/2016 3.50 MIRU WHDBOP BOPE P Perform Initial BOPE test 250/4,000 0.0 0.0 02:30 06:00 psi,Annular 2,500 psi. Witness waived by AOGCC Guy Cook at 16:53 on 06/07/2016 by phone message. 6/8/2016 6/8/2016 6.00 MIRU WHDBOP BOPE P Crew change,PJSM with rig crew, 0.0 0.0 06:00 12:00 continue testing BOPE. 6/8/2016 6/8/2016 2.50 MIRU WHDBOP BORE P Simops while testing BOPE,Install 0.0 0.0 12:00 14:30 CTC,pull test 40k,headup BHI upper quick,test e-line good test 6/8/2016 6/8/2016 2.50 MIRU WHDBOP BOPE T Swap failed R1 valve and continue 0.0 0.0 14:30 17:00 testing BOPE **Note: 2.5 hrs of Nabors down time 6/8/2016 6/8/2016 5.50 MIRU WHDBOP PRTS P PJSM-Test inner reel iron,stripper, 0.0 0.0 17:00 22:30 PDL's and TT lines.Test CTC 3,500 psi.RD test equipment 6/8/2016 6/9/2016 1.50 MIRU WHDBOP MPSP P PJSM-bring in BPV equipment,P/T, 0.0 0.0 22:30 00:00 lubricate out BPV,WHP 50 psi.LD and load out BPV equipment Page 1/27 Report Printed: 7/11/2016 i • .;. Operations Summary (with Timelog Depths) 1L-24 ConocoPhi lips '. 4trk.e Rig: NABORS CDR2-AC Job: DRILLING SIDETRACK Time Log Start Depth Start Time End Time Dur(hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth(ftKB) 6/9/2016 6/9/2016 0.50 SLOT WELLPR SFTY P Pre spud with Luke Jury's crew 0.0 0.0 /`, 00:00 00:30 6/9/2016 6/9/2016 1.00 SLOT WELLPR MILL P PJSM-Bleed down well,flow check 30 0.0 0.0 00:30 01:30 minutes. "'Note:Flow check pass with no-flow. 6/9/2016 6/9/2016 1.75 PROD1 RPEQPT PULD P e PJSM- MU/PUing ass BmAy with 2 ent"gilot o t 0.0 62.5 01:30 03:15 2.79"no-go HCC D331GEB mill. Checks installed,make up to CoilTrak, surface test. 6/9/2016 6/9/2016 2.50 PROD1 RPEQPT TRIP P RIH,pump slack forward,EDC open. 62.5 8,365.0 03:15 05:45 6/9/2016 6/9/2016 0.25 PROD1 RPEQPT DLOG P Log HRZ correction of plus 11.0 ft. 8,365.0 8,414.0 05:45 06:00 PUW 32 k 6/9/2016 6/9/2016 0.50 PROD1 RPEQPT TRIP P Continue IH,tag TOC at 8593 ft. 8,414.0 8,593.0 06:00 06:30 6/9/2016 6/9/2016 0.75 PROD1 RPEQPT DISP P 8593 ft.PUH,displace well to milling 8,593.0 8,593.0 06:30 07:15 fluid. 6/9/2016 6/9/2016 2.50 PROD1 RPEQPT MILL P 8592 ft.OB Milling cement 1.7 bpm at 8,593.0 8,616.0 07:15 09:45 2560 psi FS,BHP 2958,Open choke, IA 578,OA 151 6/9/2016 6/9/2016 3.25 PROD1 RPEQPT MILL P rotating ft.StF alling nipple,work thru 8,616.0 8,616.0 09:45 13:00 6/9/2016 6/9/2016 1.50 PROD1 RPEQPT MILL P 8616 psOB millingP he d1 .5 bpm A at 8,616.0 8,656.0 13:00 14:30 0 6/9/2016 6/9/2016 1.50 PROD1 RPEQPT MILL P 8 5 bpm at 221 656 ft,casing contact 0 ntactsi milling 33023 d 8,656.0 8,659.5 14:30 16:00 open choke,IA 390,OA 398 6/9/2016 6/9/2016 6.00 PROD1 RPEQPT MILL . P 8659 psft,OB milling ahead,1.7i FS,BHP 3025,open bppm at 8,659.5 8,727.5 16:00 22:00 IA 419,OA 398 6/9/2016 6/9/2016 0.45 PROD1 RPEQPT MILL P 8,727 ft.Stalling at 7"collar,PUW 8,727.5 8,729.0 22:00 22:27 45k,work thru rotating TF 180° 6/9/2016 6/10/2016 1.55 PROD1 RPEQPT MILL P 8,729 ft.OB milling ahead,TF 20R, 8,729.0 8,738.0 22:27 00:00 1.73 bpm at 2,658 psi FS,BHP 3,117 psi,open choke,IA 645,OA 605. ""8,732 ft.stalled,work thru rotating TF 180° ""8,734 ft.rotate TF 20R 6/10/2016 6/10/2016 0.50 PROD1 RPEQPT MILL P 8,738 ft.OB milling ahead,TF 20R, 8,738.0 8,743.0 00:00 00:30 1.73 bpm at 2,671 psi FS,BHP 3,153 psi,open choke,IA 664,OA 631. "Note:Bled IA to 30 psi&OA to 70 psi 6/10/2016 6/10/2016 0.45 PROD1 RPEQPT MILL P 8,743t ft.Rotating ot tn 7"ins casing restriction.80°2 ft. ior to r rotate 8,743.0 8,746.2 00:30 00:57 firTF 20R 6/10/2016 6/10/2016 2.00 PROD1 RPEQPT MILL P 8,746t 9 ft. Stalling kat first unable to casing 8,746.2 8,746.3 00:57 02:57 work thru rotating TF 180°,attempt at multiple TF settings from 120L/R, 140L/R Page 2/27 Report Printed: 7/11/2016 i • Operations Summary (with Timelog Depths) ..,„: )s4 "''''—' � t 1L-24 ConocoPhillips Rig: NABORS CDR2-AC Job: DRILLING SIDETRACK Time Log Start Depth Stara Time End Time Dur(hr) Phase Op Code Activity Code ' Time P-T-X Operation (ftKB) End Depth(ftKB) 6/10/2016 6/10/2016 2.00 PROD1 RPEQPT MILL P 8746.3 ft.rotating TF 30°L, 180°,and 8,746.3 8,746.5 02:57 04:57 120°L,resulted in more weight on bit Note:trace amount of metal shavings coming across shaker at 04:00 6/10/2016 6/10/2016 3.00 PROD1 RPEQPT MILL P 8746.5 ft,pump 20 bbl 1%safe lube 8,746.5 8,746.5 04:57 07:57 pill,seeing a little more surface weight,and lighter PUW 37k ****Note:MU and pump 1%safe lube pill 6/10/2016 6/10/2016 0.25 PROD1 RPEQPT MILL P 8746.5 ft,wiper to the TOC 8553 ft. 8,746.5 8,553.0 07:57 08:12 PUW 38 k. 6/10/2016 6/10/2016 0.25 PROD1 RPEQPT MILL P 8553 ft,RBIH to bottom, RIW 11 k 8,553.0 8,746.5 08:12 08:27 6/10/2016 6/10/2016 3.50 PROD1 RPEQPT MILL P 8746.5 ft.continue milling ahead, 1:53 8,746.5 8,746.6 08:27 11:57 bpm at 2580 FS,BHP 3144,open choke, IA 95,OA 162 ****Note:MU and pump 20 bbl beaded pill with no change in milling. 6/10/2016 6/10/2016 4.30 PROD1 RPEQPT MILL P 8746.6 ft.discuss with town,adjust TF 8,746.6 8,754.0 11:57 16:15 270°and 90°,continue milling ahead OB. 1.53 bpm at 2730 psi. 6/10/2016 6/10/2016 2.50 PROD1 RPEQPT MILL P 8,754 ft.continue milling ahead,OB 8,754.0 8,763.7 16:15 18:45 1.7 bpm at 2,970 psi FS. 6/10/2016 6/11/2016 5.25 PROD1 RPEQPT MILL P 8,763.7 ft.Stalling at 20R,PUW 39k, 8,763.7 8,764.0 18:45 00:00 rotate at 200R,stalling,pump 10 bbl 1%safe lube pill,OB 1.55 bpm at 2,709 psi FS,no significant help from lube pill.stalling at same. 6/11/2016 6/11/2016 1.35 PROD1 RPEQPT MILL P 8,764.03 ft. OB 1.55 bpm at 2,797 8,764.0 8,764.1 00:00 01:21 psi,mutiple stalls 6/11/2016 6/11/2016 0.20 PROD1 RPEQPT MILL P 8,764.13 ft. Wiper to 8,562 ft.PUW 8,764.1 8,562.0 01:21 01:33 42k 6/11/2016 6/11/2016 0.35 PROD1 RPEQPT MILL P Wiper back in hole,log K1 for plus 4 ft. 8,562.0 8,767.9 01:33 01:54 correction.RIW 12k. 6/11/2016 6/11/2016 3.10 PROD1 RPEQPT MILL P 8767.89 ft.Stalled,PUW 44k,OB 1.6 8,767.9 8,768.0 01:54 05:00 bpm at 2,765 psi,TF 200,pump 10 bbl 1%lube pill, 6/11/2016 6/11/2016 5.00 PROD1 RPEQPT MILL P OBM, 1.5 bpm at 2410 psi FS, BHP 8,768.0 8,768.4 05:00 10:00 3035,full open choke,IA 237,OA 326 ***TF 90°L, 110°L, 150°L,40°L ***pumping 20 bbl 1%safe lube pill 6/11/2016 6/11/2016 5.50 PROD1 RPEQPT MILL P OBM 1.5 bpm at 2480 psi FS,BHP 8,768.4 8,773.0 10:00 15:30 3091,full open choke,IA 220,OA 321 ***TF 40°L-20°R,and 100°R 6/11/2016 6/11/2016 5.00 PROD1 RPEQPT MILL P Stalling motor on reduced ID section 8,773.0 8,780.5 15:30 20:30 at 8773 ft.,adjust TF 280°R, 120R,80 -120L,Milling ahead 1.52 bpm at 2,580 psi,20R,rotate 160L 8,776.3 ft. to 8,778 ft.rotate to 20R,restart at 8,779.10 ft. Page 3/27 Report Printed: 7/11/2016 4110 • Operations Summary (with Timelog Depths) 1 1L-24 ConocoPhillips Rig: NABORS CDR2-AC Job: DRILLING SIDETRACK Time Log Start Depth Start Time End Time Dur(hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth(ftKB) 6/11/2016 6/12/2016 3.50 PROD1 RPEQPT MILL P 8,780.5 ft.Stalling motor in casing, 8,780.5 8,781.1 20:30 00:00 adjust TF 90-120R,160L,90R 1.6 bpm at 2,656 psi,reducerate to 1.50 bpm at 2,475 psi,slow milling in clear casing. 6/12/2016 6/12/2016 0.15 PROD1 RPEQPT MILL P 8,7 1.11ble ft. Call fgotom restart town to POOH 8,781.1 8 781 1 00:00 00:09 for fresh Motor(170 stalls)and mill. 6/12/2016 6/12/2016 2.25 PROD1 RPEQPT TRIP P Po OHfloat 2008 into continue POOH.tubing,flow check, 8,781.1 62.5 00:09 02:24 6/12/2016 6/12/2016 0.50 PROD1 RPEQPT OWFF P On surface, dead we well. PJSM-LD 62.5 62.5 02:24 02:54 BHA 6/12/2016 6/12/2016 1.60 PROD1 RPEQPT PULD P LLD n tBHAill,3 rows1 ll o&motor,mwotor, 9 n onnof-got o 62. 5 0.0 02:54 04:30 above mill gauge.MU BHA#2 motor and new D331 mill,MU to CoilTrak, surface test. 6/12/2016 6/12/2016 1.50 PROD1 RPEQPT TRIP P RIH,w/new D331 and 0.9°bend 0.0 8,490.0 04:30 06:00 6/12/2016 6/12/2016 0.50 PROD1 RPEQPT DLOG - P 8490 ft.tie into the lower HRZ 8,490.0 8,686.0 06:00 06:30 correction of plus 2.0 ft,log the K1 correction of plus 5.0 ft. 6/12/2016 6/12/2016 0.25 PROD1 RPEQPT TRIP P 8686 ft. ft.RIW 11e RIH thru pilot hole to 8,686.0 8,781.0 06:30 06:45 k. 6/12/2016 6/12/2016 7.00 PROD1 RPEQPT MILL P 8781 ft,1.5 bpm at 2476 psi FS,BHP 8,781.0 8,905.0 06:45 13:45 3125,WHP 0,IA 253,OA 321 6/12/2016 6/12/2016 0.25 PROD1 RPEQPT TRIP P for TD hent pilot hole,PUW 36 k.PUH 8,905.0 8,500.0 13:45 14:00 6/12/2016 6/12/2016 0.25 PROD1 RPEQPT DLOG P 8500ct.tie into the HRZ,plus 2.0 ft 8,500.0 8,522.0 14:00 14:15 n. 6/12/2016 6/12/2016 0.25 PROD1 RPEQPT TRIP P hole 2 ft,continue RIH,dry drift pilot 8,522.0 8,907.0 14:15 14:30 -*Note:weight bobble 8665 ft,8760 ft. 6/12/2016 6/12/2016 1.50 PROD1 RPEQPT REAM P 8907,aat PUH,back ream ROHS to from ft7PUH 8,907.0 8,645.0 14:30 16:00 up 8,730 ft.to 8,665 ft,back ream transition 200R to 8645 ft. 6/12/2016 6/12/2016 0.40 PROD1 RPEQPT REAM P at 2008 to 8,6 d ft.RIHdown transition 5 20R to 8 pm 8,645.0 8,788.0 16:00 16:24 30 ft.ream down 5 fpm to 8,788 ft. 6/12/2016 6/12/2016 1.40 PROD1 RPEQPT REAM P 8,78 ft. Bo k ream ft .PUH to deformed d,casing 2 ft. 8,788.0 8,581.0 16:24 17:48 back ream transition 200R to 8,650 ft. PUH to 8,581 ft. 6/12/2016 6/12/2016 0.30 PROD1 RPEQPT TRIP P ,5 WO 8B 90 ft.drift to piloo floc clle ear to , 8,581.0 8,906.0 17:48 18:06 .58,905 ft 6/12/2016 6/12/2016 2.20 PROD1 RPEQPT TRIP P 8,906 continueft.POOH,flow check at 8,545 ft. 8,906.0 62.5 18:06 20:18 6/12/2016 6/12/2016 1.20 PROD1 RPEQPT PULD P OnBHAae, tow check during mill PJSM, 62.5 0.0 20:18 21:30 LD oks good. 6/12/2016 6/12/2016 1.00 PROD1 RPEQPT PULD P PJSM l nwith Halliburton.e Caliper #3,MU toCoil, 0.0 26.1 21:30 22:30 rsurface test caliper. 6/12/2016 6/13/2016 1.50 PROD1 RPEQPT TRIP P RIH with BHA#3 26.1 8,370.0 22:30 00:00 Page 4/27 Report Printed: 7/11/2016 • • Operations Summary (with Timelog Depths) 1'_ 1L-24 Conocohifiips Rig: NABORS CDR2-AC Job: DRILLING SIDETRACK Time Log Start Depth Start Time End Time Dur(hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth(ftKB) 6/13/2016 6/13/2016 0.20 PROD1 RPEQPT DLOG P Log HRZ for plus 2.31 ft.correction. 8,370.0 8,419.0 00:00 00:12 6/13/2016 6/13/2016 0.40 PROD1 RPEQPT TRIP P Continue RIH,RIW 12k. 8,419.0 8,896.0 00:12 00:36 6/13/2016 6/13/2016 0.55 PROD1 RPEQPT DLOG P 88,89 ft.Open caliper,PUH 30 fpm, 8,896.0 8,200.0 00:36 01:09 UW 39k 6/13/2016 6/13/2016 0.50 PROD1 RPEQPT TRIP P 1 lose caliper at 8,200 ft,RBIH,RIW 8,172.0 8,896.0 01:09 01:39 6/13/2016 6/13/2016 0.45 PROD1 RPEQPT DLOG P 8,896 ft.Open caliper,PUH 30 fpm, 8,896.0 8,200.0 01:39 02:06 PUW 39k,close caliper at 8,200 ft, 6/13/2016 6/13/2016 1.55 PROD1 RPEQPT TRIP P Continue POOH for whipstock run. 8,200.0 26.1 02:06 03:39 6/13/2016 6/13/2016 0.50 PROD1 RPEQPT OWFF P Onll surface, n crew,rush check, PJSM with 26.1 26.1 03:39 04:09 ata. 6/13/2016 6/13/2016 0.85 PROD1 RPEQPT PULD P LD BHA#3,Load out caliper 26.1 0.0 04:09 05:00 equipment,bring in Baker equipment. 6/13/2016 6/13/2016 1.25 PROD1 RPEQPT PULD P PJSM-MU BHA#4 0.0 73.8 05:00 06:15 6/13/2016 6/13/2016 2.00 PROD1 RPEQPT TRIP P RIH, with Wsettinsetting g t tool.Open ,w/J- 73.8 8,385.0 06:15 08:15 hydpuming 0.25 bpm 6/13/2016 6/13/2016 0.50 PROD1 RPEQPT DLOG P 8385 ft,tie into the HRZ correction of 8,385.0 8,415.0 08:15 08:45 plus 2.0 ft.log K1 to confirm tie in no correction.PUW 36 k.close EDC 6/13/2016 6/13/2016 0.50 PROD1 RPEQPT TRIP P 8686 ft,continue RIH to setting depth. 8,415.0 8,885.8 08:45 09:15 6/13/2016 6/13/2016 0.25 PROD1 RPEQPT WPST P 8875 ft,shear setting tool at 4400 psi, 8,885.8 8,885.8 09:15 09:30 good indication of set,set down 1500 lb DHWOB,PUW 36 6/13/2016 6/13/2016 1.50 PROD1 RPEQPT TRIP P 8885 ft.,POOH,pumping 0.5 bpm. 8,885.8 73.8 09:30 11:00 6/13/2016 6/13/2016 0.50 PROD1 RPEQPT OWFF P At tr surface,BHA check well for flow,PJSM 73.8 73.8 11:00 11:30 6/13/2016 6/13/2016 0.50 PROD1 RPEQPT PULD P LD settting tools 73.8 0.0 11:30 12:00 6/13/2016 6/13/2016 1.50 PROD1 WHPST PULD P surface indst mworillling Co A#5,tools 0.0 74.4 12:00 13:30 6/13/2016 6/13/2016 1.25 PROD1 WHPST TRIP P RIH,w/milling BHA#5 0.6°bend 74.4 8,385.0 13:30 14:45 motor. 6/13/2016 6/13/2016 0.25 PROD1 WHPST DLOG P 8385 ft,Log HRZ for tie in.,correction 8,385.0 8,415.0 14:45 15:00 of plus 2.5'correction 6/13/2016 6/13/2016 0.25 PROD1 WHPST TRIP P 8415 ft.continue RIH to bottom 8,415.0 8,860.0 15:00 15:15 6/13/2016 6/13/2016 1.25 PROD1 WHPST DISP P 8860 ft.displace well to milling fluid, 8,860.0 8,500.0 15:15 16:30 perform flow survey above TOC at 8500 ft.holding 11.8ppg at the window. 6/13/2016 6/13/2016 0.25 PROD1 WHPST TRIP P 8500 ft,RBIH to dry tag TOWS. 8,500.0 8,875.0 16:30 16:45 6/13/2016 6/13/2016 0.45 PROD1 WHPST TRIP P 8875 ft,dry tag TOWS,bring pump up 8,875.0 8,874.0 16:45 17:12 1.5 bpm at 3200 psi,BHP 3469,WHP 0, IA 33,OA 125,RBIH,milling at t� 8,873.6 ft.lost prime PU off bottom. Page 5/27 Report Printed: 7/11/2016 0 • ' Operations Summary (with Timelog Depths) n 1 L-24 ConocoPtritilps Rig: NABORS CDR2-AC Job: DRILLING SIDETRACK Time Log Start Depth Start Time End Time Dur(hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth(ftKB) 6/13/2016 6/14/2016 6.80 PROD1 WHPST WPST P practice 5MiLOHS, bpm at ill window per m200ed 8,874.0 8,877.7 17:12 00:00 /psi, 1.5k WOB,metal across shaker. "8,875 ft had sudden increase in WOB 2.6k to 3.65k,let mill off to 1.7k, - had to rotate TF 360°due to up against stops. / - t *18,876:4 ft.Stall,restart 6/14/2016 6/14/2016 3.00 PROD1 WHPST WPST P 8,877.7 B.2 Milling A1.57 300,bpm Om at37 ,252 8,877.7 8,879.0 00:00 03:00e 6/14/2016 6/14/2016 5.75 PROD1 WHPST WPST P 8,t 8 9ffth peillrout side casing, a ing,cionetinufor 2 8,879.0 8,895.0 03:00 08:45 ft,following tripping schedule, 1.56 bpm at 3,539 psi,BHP 3,687 psi, WHP 235, IA 340,OA 410 6/14/2016 6/14/2016 0.25 PROD1 WHPST TRIP P 8o895r eft MD.TD'd rathole,pull up hole 8,895.0 8,680.0 f 08:45 09:00 8,680.0 8,896.0 -in. 6/14/2016 6/14/2016 0.25 PROD1 WHPST DLOG P Log K1 for correction of+1 ft 09:00 09:15 8,896.0 8,896.0 6/14/2016 6/14/2016 0.50 PROD1 WHPST WAIT P Call town for path forward 09:15 09:45 8,896.0 8,895.0 6/14/2016 6/14/2016 0.25 PROD1 WHPST TRIP P Dry tag TD 09:45 10:00 6/14/2016 6/14/2016 1.00 PROD1 WHPST TRIP P Backreamed 8883tLo 8868 35L,ft 25 R,andDr8,895 0 8,868.0 10:00 11:00 160drift to 8895 ft MD. 6/14/2016 6/14/2016 1.75 PROD1 WHPST TRIP P POOH OH while it epumpinging tbp pm at 404 8,868.0 74.3 11:00 12:45 psi pump Open EDC,cont POOH. 6/14/2016 6/14/2016 0.75 PROD1 WHPST SFTY P At surface,PJSM for PUD 74.3 74.3 12:45 13:30 74.3 0.0 6/14/2016 6/14/2016 1.50 PROD1 WHPST PULD P Break off injector,cont PUD 13:30 15:00 0.0 0.0 6/14/2016 6/14/2016 0.50 PROD1 DRILL SFTY P PJSM for PD and AAR on PUD 15:00 15:30 6/14/2016 6/14/2016 1.00 PROD1 DRILL PULD P PD BHA#6 .Changee checks,make up 0.0 72.2 15:30 16:30 6/14/2016 6/14/2016 2.50 PROD1 DRILL TRIP P Bump BHA#up. RenttHRZ for R1H ft with 72.2 8,895.0 16:30 19:00 correction.Close EDC.Pump minimum rate tripping through pilot hole.Clean trip through window. 6/14/2016 6/15/2016 5.00 PROD1 DRILL DRLG P Back bottomPuon mping Bdilling att 3580ldsicsection. 8,895.0 8,996.0 19:00 00:00 3160 psi.WOB=1.5KIbs.CTW= 11 Klbs.ROP=20 FPH.WHP=220 psi BHP=3755 psi. DRLG P Back on bottom drilling.Pumping 1.6 8,996.0 9,125.0 6/15/20166 6.25 PROD1 DRILL =3160 psi.WOB 6/15/2016BPM at 3540 psi.FS 00:00 06:15 =1.4-1.6KIbs.CTW=10KIbs.ROP= 10-20 FPH.WHP=220 psi BHP=, 3760 psi. 6/15/2016 6/15/2016 0.75 PROD1 DRILL TRIP P 9125 ft,TD build section,PUW 28 k 9,125.0 8,560.0 06:15 07:00 Page 6/27 Report Printed: 7/11/2016 • • Operations Summary (with Timelog Depths) ' 1L-24 ConocoPhillips • Rig: NABORS CDR2-AC Job: DRILLING SIDETRACK Time Log Start Depth Operation (ftKB) End Depth(ftKB) Start Time End Time Our(hr) Phase Op Code Activity Code Time P-T-X O P 8,560.0 6/15/2016 6/15/2016 0.25 PROD1 DRILL TRIP P 8573 ft,PUH 1 fpm,w/open EDC 8,560.0 07:00 07:15 **Note:Pressure survey,pumping 1.5 bpm,11.8 ECD,annular pressure 3498, 170 WHP 6/15/2016 6/15/2016 1.25 PROD1 DRILL TRIP P POOH to surface 8,560.0 72.2 07:15 08:30 6/15/2016 6/15/2016 0.25 PROD1 DRILL SFTY P Tagup at surface space out,PJSM for 72.2 72.2 08:30 08:45 PUD 6/15/2016 6/15/2016 3.00 PROD1 DRILL PULD P PUD,build section BHA#6 72.2 0.0 08:45 11:45 6/15/2016 6/15/2016 1.50 PROD1 DRILL PULD P PD,lateral BHA#7 0.0 72.2 11:45 13:15 6/15/2016 6/15/2016 1.75 PROD1 DRILL TRIP P RIH with lateral section BHA,0.4°bent 72.2 8,375.0 13:15 15:00 motor with RB HYC 6/15/2016 6/15/2016 0.25 PROD1 DRILL DLOG P 8,371'MDion tiie-in to Hf plus 3 5Z R Logged marker e K1ith to 8,375.0 8,407.0 15:00 15:15 confirm tie-in with plus 0.5'correction. 6/15/2016 6/15/2016 0.25 PROD1 DRILL TRIP P 8898'MD53 4'TVDSS:pm Pressure psi pump 8,407.0 9,125.0 15:15 15:30 surpressure, 11.83 ECD,3633 psi • annular pressure,in MM 8.83 ppg/out MM 8.79 ppg RBIH. 6/15/2016 6/15/2016 4.00 PROD1 DRILL DRLG P Back on bottom drilling.Pumping 1.5 9,125.0 9,332.0 15:30 19:30BPM at 3570 psi.FS=400 psi.WOB =1.4-1.7KIbs.CTW=10KIbs.ROP= 50-70 FPH.WHP=290 psi BHP= 3800 psi.Begin mud swap at 19:00hrs. 6/15/2016 6/15/2016 3.00 PROD1 DRILL DRLG P New mud at the bit at 9332 ft. 9,332.0 9,525.0 19:30 22:30 Continue drilling ahead pumping 1.5 BPM at 3700 psi.FS=3405 psi.WOB =1.4-1.7KIbs.CTW= 10KIbs.ROP= 50-70 FPH.WHP=430 psi BHP= 3820 psi. 6/15/2016 6/15/2016 0.50 PROD1 DRILL WPRT P Planned wiper rtrip n trip up to ,000 ft. PUW 9,525.0 9,525.0 22:30 23:00 out. 6/15/2016 6/16/2016 1.00 PROD1 DRILL DRLG P Continue drilling ahead pumping 1.55 9,525.0 9,588.0 23:00 00:00 BPM at 3785 psi.FS=3410 psi.WOB =1.6KIbs.CTW=9.5Klbs.ROP=100 -120 FPH.WHP=430 psi BHP= 3870 psi. 6/16/2016 6/16/2016 3.00 PROD1 DRILL DRLG P Continue drilling ahead pumping 1.50 9,588.0 9,925.0 00:00 03:00 BPM at 3800 psi.FS=3410 psi.WOB =1.8-2.OKIbs.CTW=9.2Klbs.ROP= 100-160 FPH.WHP=442 psi BHP= 3896 psi. 6/16/2016 6/16/2016 1.00 PROD1 DRILL WPRT P Begin plannednwiper trip to 9,100 ft. 9,925.0 9,925.0 03:00 04:00 8Klbs 6/16/2016 6/16/2016 4.00 PROD1 DRILL DRLG P 9,925',BOBD 1.6 bpm at 3,650 psi 9,925.0 10,325.0 04:00 08:00 FS,480 diff,BHP 3,880,WHP 300, IA 515,OA 527 6/16/2016 6/16/2016 1.00 PROD1 DRILL WPRT P 10,325 ft,PUW 30 k wiper up hole to 8,900 ft, 10,325.0 10,325.0 08:00 09:00 6/16/2016 6/16/2016 2.75 PROD1 DRILL DRLG P 10, 25 ft,FS, BOBD 1 .5 2P 96 bpm a t 3A 526 ,psiO10,325.0 10,532.0 09:00 11:45 529 6/16/2016 6/16/2016 0.50 PROD1 DRILL WPRT P 10,532 10,532 ft,50PU0,wiper up hole to 10,532.0 10,532.0 11:45 12:15 Page 7/27 Report Printed: 7/11/2016 • • • ,R operations Summary (with Timelog Depths) i 1 L-24 t ConocoPhitlips Rig: NABORS CDR2-AC Job: DRILLING SIDETRACK Time Log Start Depth Start Time End Time Dur(hr) Phase Op Code Activity Code Time P-T-X Operation (ftKE) End Depth(ftKB) 6/16/2016 6/16/2016 2.00 PROD1 DRILL DRLG P 10,532 ft.BOBD 1.6 bpm at 3,650 psi 10,532.0 10,714.0 12:15 14:15 FS,BHP 3,870,WHP 295,IA 628,OA 609 6/16/2016 6/16/2016 1.00 PROD1 DRILL WPRT P 10,714 ft,wiper up hole to 9,704 ft. 10,714.0 10,714.0 14:15 15:15 PUW 31 k.Wiper back in hole 80° LOHS,stack out at 10,514 ft,PUH orient TF 100°LOHS,stack out again, PUH,orient high side and lower pump rate to 0.75 bpm pass thru clean, continue RIHTB. 6/16/2016 6/16/2016 2.75 PROD1 DRILL DRLG P 10,721 ft,off,PUH inspect,clean not consistent 7 ft 10,714.0 10,880.0 15:15 18:00 and reset INJH counter to CTES counter, 10,714 ft,depth change minus 7.0 ft.BOBD 1.6 bpm at 3,770 psi,BHP 3852,WHP 299,IA 680,OA 647 ***Note:Bleed IA 205 psi and OA 198 psi. ***Note:mud swap,new mud at the bit at 10743 ft. 6/16/2016 6/16/2016 0.75 PROD1 DRILL DRLG P bContinue npm int 3930 psliaWHP head pu31s psi, 59 10, 880.0 10,963.0 18:00 18:45 3900 psi.WOB 1.6 Klbs.ROP 110 fph. 6/16/2016 6/16/2016 1.75 PROD1 DRILL WPRT P Start tie-in e-inwitrip p wipTieer trip. in to WA 344KIr a bs. 10 ,963.0 10,963.0 18:45 20:30 foot correction.RBIH.Took weight at 10,515 ft.Stacked out at 10,775 ft. PUH,PUW=37KLbs.RBIH with TF at HS,continue to bottom. 6/16/2016 6/16/2016 0.50 PROD1 DRILL DRLG P Continue drilling ahead pumping 1.60 10,963.0 11,014.0 20:30 21:00 bpm at 3900 psi.WHP 319 psi,BHP 3980 psi.WOB 2-2.2Klbs ROP 80-110 fph. Annular presure indicating possible packoff above BHA.Begin precautionary BHA wiper trip. 6/16/2016 6/16/2016 0.50 PROD1 DRILL WPRT P BHA wiper trip.PUW=37KIbs. 11,014.0 11,014.0 21:00 21:30 6/16/2016 6/17/2016 2.50 PROD1 DRILL DRLG P Back on bottom drilling,pumping 1.6 11,014.0 11,175.0 21:30 00:00 bpm at 4000 psi.WHP=240 psi,BHP =3980.WOB 2.4Klbs ROP=60-80 fph. 6/17/2016 6/17/2016 1.00 PROD1 DRILL DRLG P Back on bottom drilling,pumping 1.6 11,175.0 11,213.0 00:00 01:00 bpm at 4000 psi.FS=3630 psi,WHP =240 psi,BHP=3980.ROP=60-80 fph. 6/17/2016 6/17/2016 1.00 PROD1 DRILL WPRT P Beginbplanned wiper trip.PUW 37 11,213.0 11,213.0 01:00 02:00 s. Several minor pack off events, RBIH,stacked out at 10,500.PUH, reduced pump rate from 1 BPM to 0.5 BPM.Run through trouble section to 10,800 ft. Bring pumps back up and continue to bottom. 6/17/2016 6/17/2016 5.50 PROD1 DRILL DRLG P Back on bottom drilling,pumping 1.5 11,213.0 11,463.0 02:00 07:30 bpm at 3600 psi.WHP=238psi,BHP =3980.WOB 2.4Klbs ROP=60-80 fph. Page 8/27 Report Printed: 7/11/2016 • • Operations Summary (with Timelog Depths) -4 1 L-24 ConceoPhillips ', Rig: NABORS CDR2-AC Job: DRILLING SIDETRACK Time Log Start Depth • Start Time End Time Dur(hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth(ftKB) 6/17/2016 6/17/2016 0.75 PROD1 DRILL WPRT P 11,463 33 k wiper up hole to 10,600 ft, 11,463.0 10,600.0 07:30 08:15 6/17/2016 6/17/2016 0.50 PROD1 DRILL WPRT P 10,600 ft,wiper back in hole,RIW 8 k. 10,600.0 11,265.0 08:15 08:45 6/17/2016 6/17/2016 0.25 PROD1 DRILL WPRT P 1o,265loft, stacker etloout. PU, orient TF 11,265.0 11,463.0 08:45 09:00 tSuccessfully pass through. 6/17/2016 6/17/2016 2.00 PROD1 DRILL DRLG P 11, 63 ft,BOD 1.51 FS46HP 005,WHP 207mIA at 3650 50 psi 11,463.0 11,561.0 09:00 11:00 A 288 6/17/2016 6/17/2016 0.25 PROD1 DRILL WPRT P 11,561 ft,200'wiper,PU wt=28klbs. 11,561.0 11,561.0 11:00 11:15 6/17/2016 6/17/2016 1.50 PROD1 DRILL DRLG P 11,5611i BHP BD71 1 psi,ROP 80 25 ph 11,561.0 11,610.0 11:15 12:45 6/17/2016 6/17/2016 0.50 PROD1 DRILL WPRT P 11,610 ft,early wiper trip to regain 11,610.0 10,770.0 CTSW&to window for tie-in. 12:45 13:15 10,770.0 8,890.0 13.15 15 016 0/2016 1.75 PROD1 DRILL WPRT T 10,770 ft,ba kre m from 1ulled tight.RBIH, 0 840 ft @ 1.5 BPM. 13:15 15:00 Pulled tight again @ 10,770 ft, CTSW=50klbs @ 1 FPM(-11 klbs= WOB).RBIH 15 ft.Pumped 5x5 sweep.PUH©15 FPM, 1.5 BPM, successfully pulled through. 6/17/2016 6/17/2016 0.25 PROD1 DRILL DLOG T 8890 ft, tie-in to RA for a plus 5 ft 8,890.0 10,250.0 15:00 15:15 n. Decision made to plug back due to high GR.1.3%DS seen in returns from sweep. 6/17/2016 6/17/2016 2.75 PROD1 DRILL WPRT T 10,250 bupdped section hieas.-vis weepPOOto 10, 250.0 700.0 15:15 18:00 Open EDC once inside tubing tail,and continue out of the hole. 6/17/2016 6/17/2016 2.25 PROD1 DRILL WPRT T Packed off clean B. Swi ch to Choke 700.0 8,500.0 18:00 20:15 hole. SIMOPS:Also observed MMout not reading correctly.Isolated Choke B and MM,blow down with air and water.Back online with choke B. MM still not reading correctly. 6/17/2016 6/17/2016 0.75 PROD1 DRILL WPRT T 8500le. Tie toin eo the ,cA for ii a e in foot n the 8,500.0 9,212.0 20:15 21:00 correction.Send 5x5 sweep.Continue in the hole 9212 ft. 6/17/2016 6/17/2016 2.50 PROD1 DRILL WPRT T 9212 ft.POOH chasing sweep. Stop 9,212.0 72.0 21:00 23:30 above tubing tail and open EDC. Continue out of the hole to surface. Shale obseved over the shakers after 700 ft. 6/17/2016 6/18/2016 0.50 PROD1 DRILL PULD T 72 ft.PJSM.PUD lateral BHA#7. 72.0 72.0 23:30 00:00 6/18/2016 6/18/2016 1.50 PROD1 DRILL PULD T 1 Continue to PUD BHA#7.Bit grade 3- 72.0 0.0 00:00 01:30 SIMOPS: Inspect Choke B,replace seat. Inspect and clean counter. Attempt to flush micromotion with air and water.MM out still reading incorrectly. Page 9/27 Report Printed: 7/11/2016 • • ' ; Operations Summary (with Timelog Depths) d 1L-24 ConacoPhitflps fit.�ska Rig: NABORS CDR2-AC Job: DRILLING SIDETRACK Time Log Start Depth Start Time End Time Dur(hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth(ftKB) 6/18/2016 6/18/2016 2.50 PROD1 STK PULD T PD BHA#8,Aluminum billet with open 0.0 72.0 01:30 04:00 hole anchor. Change out floats in UQC.Check packoffs. 6/18/2016 6/18/2016 2.25 PROD1 STK WPST T RIH BHA#8 72.0 8,385.0 04:00 06:15 6/18/2016 6/18/2016 0.25 PROD1 STK DLOG T Tie-in to HRZ+3.5 ft correction 8,385.0 8,550.0 06:15 06:30 6/18/2016 6/18/2016 0.50 PROD1 STK DLOG T Close EDC,no pumping.Check tie-in 8,550.0 8,761.0 06:30 07:00 ©K1,+1 ft correction. 6/18/2016 6/18/2016 0.50 PROD1 STK DLOG T RIH.Tie-in @ RA,+4 ft correction.No 8,761.0 8,900.0 07:00 07:30 good compared to K1 correction. Check counter,lubricate chain.PUH to 8650'to log K1 again.Pressure up annular. 6/18/2016 6/18/2016 0.25 PROD1 STK DLOG T Log K1 again,+2 ft correction. 8,900.0 8,694.0 07:30 07:45 6/18/2016 6/18/2016 0.50 PROD1 STK DLOG T RIH.Tie-in @ RA,+1.5 ft.No good 8,694.0 8,900.0 07:45 08:15 (1.5 ft off after 223 ft). 6/18/2016 6/18/2016 1.50 PROD1 STK SVRG T PUH to replace counter 8,900.0 8,650.0 08:15 09:45 6/18/2016 6/18/2016 0.25 PROD1 STK DLOG T RIH.Log K1 again,+0.5 ft correction. 8,650.0 8,699.0 09:45 10:00 6/18/2016 .6/18/2016 0.25 PROD1 STK DLOG T RIH.Tie-in©RA,no correction. 8,699.0 8,699.0 10:00 10:15 6/18/2016 6/18/2016 1.25 PROD1 STK DLOG T RIH to 10,262'.PU to neutral&pump 8,699.0 10,262.0 10:15 11:30 up to set anchor.Top of billet @ 10,250',TF @ 170ROHS 6/18/2016 6/18/2016 1.00 PROD1 STK WPST T Set down 3klbs,PU off billet,POOH. 10,262.0 8,550.0 11:30 12:30 6/18/2016 6/18/2016 1.50 PROD1 STK TRIP T Open EDC,cont POOH. • 8,550.0 72.0 12:30 14:00 6/18/2016 6/18/2016 3.50 PROD1 STK PULD T PJSM,PUD BHA#8,anchored billet 72.0 0.0 14:00 17:30 running tools. LD BOT tools.Change lower MWD. Swap UQC and flush micromotion. Micomotion is now reading correct mud density. 6/18/2016 6/18/2016 2.50 PROD1 STK PULD T PJSM,PD BHA#9,with 0.5°AKO and 0.0 72.0 17:30 20:00 RB HYC bit. Change out pack offs.Test MWD, strip on well. Bump up and reset counters. 6/18/2016 6/18/2016 1.25 PROD1 STK TRIP T RIH with BHA#9.Tie in to the HRZ for 72.0 10,258.0 20:00 21:15 a+19 foot correction.Continue in the hole.Confirmed tie-in at the RA. Dry tag top of billet at 10,258 ft. 6/18/2016 6/19/2016 2.75 PROD1 STK KOST T Begin drilling off of billet per 10,258.0 10,259.0 21:15 00:00 procedure. Stalled 3 times while getting kicked off.Aluminum observed over the shakers. 6/19/2016 6/19/2016 2.00 PROD1 STK KOST T Continue drilling off of billet per 10,259.0 10,261.0 00:00 02:00 procedure.Stall.PUH and restart. Continue drilling. 6/19/2016 6/19/2016 1.25 PROD1 DRILL DRLG T Drill off of billet,continue to drill to 10,261.0 10,310.0 02:00 03:15 10310 ft. 6/19/2016 6/19/2016 0.75 PROD1 DRILL WPRT T Clean dry drift through billet area. 10,310.0 10,310.0 03:15 04:00 PUH to RA and tie in for a+2 ft ' correction.RBIH. Page 10/27 Report Printed: 7/11/2016 • • Operations Summary (with Timelog Depths) _ ; 1L-24 ConocoPhimps '- risn.° Rig: NABORS CDR2-AC Job: DRILLING SIDETRACK Time Log Start Depth Start Time End Time Dur(hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth(ftKB) 6/19/2016 6/19/2016 0.50 PROD1 DRILL WPRT T RIH,stacked weight at 9,095 ft with 10,310.0 10,310.0 04:00 04:30 HS tool face.Orient 50 LOHS, Continue in the hole to bottom at 10,310 ft. 6/19/2016 6/19/2016 3.50 PROD1 DRILL DRLG T Drill ahead from 10,310 to10,489 ft. 10,310.0 10,489.0 04:30 08:00 1.5 bpm at 3725-3950 psi pump pressure.BHP=4500 psi.WOB 1.2- 2.2Klbs.ROP=40-60 fph.. 6/19/2016 6/19/2016 3.50 PROD1 DRILL DRLG T Short PU,RBIH,&drill ahead to 10,489.0 10,672.0 08:00 11:30 10,672.Encountered Fault#1 @ 10,511 ft. 6/19/2016 6/19/2016 0.25 PROD1 DRILL DLOG T PU to 10,628 ft to re-log data gap 10,672.0 10,672.0 11:30 11:45 where MWD tool shut off. 6/19/2016 6/19/2016 0.75 PROD1 DRILL DRLG T Drill ahead to 10,710 ft. 10,672.0 10,710.0 11:45 12:30 6/19/2016 6/19/2016 1.00 PROD1 DRILL WPRT T Planned wiper trip to window after 400' 10,710.0 8,890.0 12:30 13:30 of drilling. 6/19/2016 -6/19/2016 0.25 PROD1 DRILL DLOG T Tie-in to RA for+0.5 ft correction. 8,890.0 8,915.0 13:30 13:45 6/19/2016 6/19/2016 1.00 PROD1 DRILL WPRT T 8915 ft,continue wiper in hole.RIW 7 8,915.0 10,710.0 13:45 14:45 k,stacked out @ 10,511'.PUH, oriented DTF 80°LOHS,and passed through. 6/19/2016 6/19/2016 1.25 PROD1 DRILL DRLG T 10710 ft,BOBD 1.54 bpm at 3505 psi 10,710.0 10,810.0 14:45 16:00 FS,BHP 3885,WHP 436, IA 125,OA 260 ""Note:New mud system#3 to bit 10710 ft. 6/19/2016 6/19/2016 0.25 PROD1 DRILL DRLG T Experience partial losses©10,810 ft. 10,810.0 10,812.0 16:00 16:15 PUH 18 ft,re-establish pump rate& annular pressure.Cont.drilling ahead. 6/19/2016 6/19/2016 0.25 PROD1 DRILL WPRT T PUH for BHA wiper to improve drilling. 10,812.0 10,812.0 16:15 16:30 6/19/2016 6/19/2016 5.50 PROD1 DRILL DRLG T 10812ft,BOBD 1.55 bpm at 3700 psi 10,812.0 11,111.0 16:30 22:00 FS,BHP 3920,WHP 417,IA 189,OA 319 Several motor stalls.PU and restart at 10815 ft, 10828 ft, 11007 ft. ROP 60-80 fph. 6/19/2016 6/19/2016 0.75 PROD1 DRILL WPRT T 11,111 ft.Wiper up to 10,275 ft. 11,111.0 11,111.0 22:00 22:45 RBIH,stack out at 10420 ft,10534 ft, and 10648 ft. 6/19/2016 -6/20/2016 1.25 PROD1 DRILL DRLG T 11,111ft,BOBD 1.58 bpm at 3470 psi 11,111.0 11,201.0 22:45 00:00 FS,BHP 3920,WHP 280, IA 196,OA 322 Losses—1 BPH. 6/20/2016 6/20/2016 5.50 PROD1 DRILL DRLG T 11,201ft,BOBD 1.56 bpm at 3480 psi 11,201.0 11,493.0 00:00 05:30 FS,BHP 3980,WHP 330, IA 201,OA 330 Losses 3-4 BPH. 6/20/2016 6/20/2016 0.50 PROD1 DRILL DRLG T 11,493 ft.Wiper up to 10,700 ft.Pump 11,493.0 11,493.0 05:30 06:00 5x10 sweep,no shale seen in returns. RBIH clean. 6/20/2016 6/20/2016 2.75 PROD1 DRILL DRLG T 11,493 ft.BOBD,BHP 4458 11,493.0 11,610.0 06:00 08:45 Losses—1 BPH.Total losses(incl yesterday)=34 bbls @ 0700. Page 11127 Report Printed: 7/11/2016 • • Operations Summary (with Timelog Depths) ., 1L-24 x , cc onP '} hitlips , Rig: NABORS CDR2-AC Job: DRILLING SIDETRACK Time Log Start Depth Start Time End Time Dur(hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth(ftKB) 6/20/2016 6/20/2016 1.50 PROD1 DRILL DRLG P 11,610 ft.Drilling ahead,back on"P" 11,610.0 11,679.0 08:45 10:15 time(passed plug back TD). 1.53 BPM @ 3670 psi,WOB 1.2klbs,ROP 58 FPH,653 psi differential,WHP 307,IA 208,OA 340. 6/20/2016 6/20/2016 0.25 PROD1 DRILL WPRT P BHA wiper to 11,578 ft.PUW=35klbs 11,679.0 11,679.0 10:15 10:30 6/20/2016 6/20/2016 0.25 PROD1 DRILL DRLG P Drill ahead.Mini-wiper @11,689 ft, 11,679.0 11,690.0 10:30 10:45 pump 5x10 sweep. ROP=20-40 FPH 6/20/2016 6/20/2016 2.25 PROD1 DRILL WPRT P Tie-in wiper @ 11,690 ft.Pull tight 11,690.0 8,890.0 10:45 ' 13:00 (CTSW=45klbs)@ 11,540 ft.RBIH. Work through. Cont.PUH,pulling tight @ 11,517', 11,490', 10,507'.Pulled tight(WOB=- 5klbs)10,397'-10,380'.Work through. 6/20/2016 6/20/2016 0.25 PROD1 DRILL DLOG P Tie-in to RA(+5 ft correction). 8,890.0 8,908.0 13:00 13:15 6/20/2016 6/20/2016 1.50 PROD1 DRILL WPRT P RBIH.Stack out @ 9035',10415', 8,908.0 11,524.0 13:15 14:45 10662', 11471', 11520. CTSW-48klbs when PUH. 6/20/2016 6/20/2016 0.50 PROD1 DRILL WPRT P 11,524 ft.PUH to clean up.Packing 11,524.0 10,979.0 14:45 15:15 off. Decision made to plug back(PB2)due to deteriorating hole conditions. 6/20/2016 6/20/2016 0.25 PROD1 DRILL WPRT T RBIH to clean up to 11,231'in prep for 10,979.0 11,231.0 15:15 15:30 next billet+OH anchor setting area. 6/20/2016 6/20/2016 0.75 PROD1 DRILL WPRT T 11,230 ft.PUH.CTSW 35klbs.Pump 11,231.0 10,650.0 15:30 16:15 5x10 sweep.Jog—80'until sweep exits bit,then,chase up hole. 6/20/2016 6/20/2016 1.75 PROD1 DRILL WPRT T 10,650 ft.Pull tight.Work up&down 10,650.0 10,350.0 16:15 18:00 to clean hole between 10,650& 10,490'.Starting to pack off and pull heavy.Continue to work up hole to 10,300 ft. 6/20/2016 6/20/2016 3.00 PROD1 DRILL WPRT T Pump low vis sweep,begin swab 10,350.0 1,500.0 18:00 21:00 wiper trip. 6/20/2016 6/20/2016 0.25 PROD1 DRILL WPRT T Jog down to 2500 ft.Substantial 1,500.0 1,500.0 21:00 21:15 amount of material observed over the shaker including cuttings and cavings. Density out peaked at 10.5 ppg on micromotion. 6/20/2016 6/20/2016 0.75 PROD1 DRILL WPRT T Continue out of the hole to the swabs. 1,500.0 72.0 21:15 22:00 Bump up and reset depths. 6/20/2016 6/21/2016 2.00 PROD1 DRILL WPRT T RBIH.Tie in to the HRZ for a+14 foot 72.0 9,227.0 22:00 00:00 correction.Weight check=30KIbs. Continue in the hole and confirm tie in at the RA.RIH. 6/21/2016 6/21/2016 0.50 PROD1 DRILL WPRT T Continue to RIH.Clean trip through 9,227.0 10,300.0 00:00 00:30 the pilot hole,window and build.Clean trip to 10,300ft. 6/21/2016 6/21/2016 1.00 PROD1 DRILL WPRT T RIH additional 50 feet. Initial PUW= 10,300.0 10,371.0 00:30 01:30 32Klbs. Began dragging 39KIbs.Made multiple attempts to work past 10,371 ft.Beginning to pack off and pull heavy. Last pick up at 10371 was 42KIbs. Pump 5x5 sweep. Page 12/27 Report Printed: 7/11/2016 • S .„ Operations Summary (with Timelog Depths) 4)tom 1L-24 Co€►ocillips "" Rig: NABORS CDR2-AC Job: DRILLING SIDETRACK Time Log Start Depth Start Time End Time Dur(hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth(ftKB) 6/21/2016 6/21/2016 1.25 PROD1 DRILL WPRT T Begin POOH to tubing.Call town to 10,371.0 8,700.0 01:30 02:45 discuss plan forward. 6/21/2016 6/21/2016 0.75 PROD1 DRILL WPRT T Made decision to run liner from 8,700.0 10,300.0 02:45 03:30 10,300ft with top of anchored billet at 9850 ft. RBIH to condition the hole for liner run. 6/21/2016 6/21/2016 2.75 PROD1 DRILL WPRT T Pumped 8x32 sweep to clear pits for 10,300.0 72.0 03:30 06:15 liner running pill.POOH.No excessive cuttings/cavings seen at surface. 6/21/2016 6/21/2016 3.85 PROD1 DRILL WPRT T RBIH to ensure hole is clean&lay in 72.0 10,650.0 06:15 10:06 liner running pill(11.8ppg Sodium Bromide).Tie-in to HRZ for+12.5' ' correction,K1 for+.5'correction,and RA for-1'corection,continue in hole. 6/21/2016 6/21/2016 3.15 PROD1 DRILL CIRC T Pump liner pill.POOH laying in 10,650.0 95.5 10:06 13:15 completion fluid.Paint EOP flag @ 8,300'. 6/21/2016 6/21/2016 0.50 PROD1 DRILL OWFF T Monitor well for flow,no flow. 95.5 95.5 13:15 13:45 6/21/2016 6/21/2016 1.25 PROD1 DRILL PULD T PJSM.LD BHA#9.Prep floor for liner 95.5 0.0 13:45 15:00 run. 6/21/2016 6/21/2016 2.50 COMPZ1 CASING PUTB T PJSM.MU Liner assembly bull nose, 0.0 510.0 15:00 17:30 14 jts slotted,anchored billet.MU BHA #10. 6/21/2016 6/21/2016 3.50 COMPZ1, CASING RUNL T RIH with liner to setting depth.Close 510.0 10,299.0 17:30 21:00 EDC.Tie in at HRZ for a+1.5 ft correction.Clean trip through tubing, pilot hole,window and build.Clean trip in OH to set depth 10,299 ft. PU to neutral weight.Bring pumps up, set anchors at 3,500 psi.Set down 4Klbs to confirm set. 6/21/2016 6/21/2016 2.00 COMPZ1 CASING TRIP T POOH with liner running tools. 10,299.0 61.0 21:00 23:00 6/21/2016 6/21/2016 0.50 COMPZ1 CASING OWFF T Flow check at surface.Static. 61.0 61.0 23:00 23:30 6/21/2016 6/22/2016 0.50 COMPZ1 CASING PULD T Lay down liner running BHA#10. 61.0 0.0 23:30 00:00 6/22/2016 6/22/2016 0.50 COMPZ1 CASING PULD T Finish LD BHA#10. 0.0 0.0 00:00 00:30 6/22/2016 6/22/2016 2.00 PROD2 WHDBOP RURD P Clean up floor. MU nozzle.Stab 0.0 0.0 00:30 02:30 injector.Swap reel to water for BOPE test. 6/22/2016 6/22/2016 2.50 PROD2 WHDBOP RURD P PT inner reel iron and pack offs. 0.0 0.0 02:30 05:00 Grease choke manifold valves.Prep for BOPE test. 6/22/2016 6/22/2016 10.00 PROD2 WHDBOP BOPE P Perform bi-weekly 250/4100 psi, 0.0 0.0 05:00 15:00 annular 2500 psi.Test waived by AOGCC(Johnnie Hill).No failures, grease and retest R1 and C11.LD test equipment.Prep rig for visitors. 6/22/2016 6/22/2016 2.25 PROD2 STK PULD T PJSM.PU/MU BHA#11,with 0.5° 0.0 72.5 15:00 17:15 AKO motor and RB HCC bit. Install floats in UQC,skid and MU QC. Test MWD.Stab on well head.Bump up,open EDC. 6/22/2016 6/22/2016 1.00 PROD2 STK CIRC T Line up and swap reel from water to 72.5 72.5 17:15 18:15 11.8ppg NaBr. Page 13/27 Report Printed: 7/11/2016 • • ...','::::;ilillk- Operations Summary (with Timelog Depths) :V:.'k 1L-24 Conor itti(is d,txk,a Rig: NABORS CDR2-AC Job: DRILLING SIDETRACK Time Log Start Depth Start Time End Time Dur(hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth(ftKB) 6/22/2016 6/22/2016 2.50 PROD2 STK TRIP T RIH with BHA#11.Tie in to the HRZ 72.5 9,850.0 18:15 20:45 for a+14.5 foot correction.Close EDC.Weight check=31 Klbs.RIH and dry tag billet at 9850 ft. 6/22/2016 6/22/2016 1.50 PROD2 STK CIRC T PUH,roll hole from NaBr completion 9,850.0 9,832.0 20:45 22:15 fluid to 8.7 ppg FloPro. 6/22/2016 6/22/2016 1.50 PROD2 STK TRIP T RBIH,and dry tag billet.PUH.Bring 9,832.0 9,850.0 22:15 23:45 up pumps and prep to drill off of billet. 6/22/2016 6/23/2016 0.25 PROD2 STK KOST T Begin drilling off of billet. 9,850.0 9,851.0 23:45 00:00 6/23/2016 6/23/2016 2.00 PROD2 STK KOST T Continue drilling off of billet.Drill rat 9,851.0 9,880.0 00:00 02:00 hole to 9880 ft. 6/23/2016 6/23/2016 0.50 PROD2 DRILL TRIP T PUH,30Klbs PUW. 9,880.0 9,880.0 02:00 02:30 RBIH and dry drift kick off area.Clean. 6/23/2016 6/23/2016 2.50 PROD2 DRILL DRLG T Back on bottom drilling.Pumping 1.6 9,880.0 10,000.0 02:30 05:00 BPM at 3600 psi.FS=353 psi.WOB =1.5 Klbs,CTW=9.5Klbs.Pumped new mud system with additional KlaStop/KCL,new mud at bit 9,942'. 6/23/2016 6/23/2016 5.00 PROD2 DRILL DRLG T Continue drilling: 1.65 BPM @ 3,725 10,000.0 10,280.0 05:00 10:00 PSI,BHP=3,940 PSI,CTW=7.5K, FS=325,WOB=1.6,ROP=60. 6/23/2016, 6/23/2016 0.85 PROD2 DRILL WPRT T Wiper to 9,500',PUW=34K,hold TF 10,280.0 10,280.0 10:00 10:51 thru high gamma area.RBIH. 6/23/2016 6/23/2016 3.70 PROD2 DRILL DRLG T BOBD: 1.65 BPM @ 3,775 PSI, 10,280.0 10,465.0 10:51 14:33 BHP=3,865 PSI,CTW=7.9K,FS=315, WOB=1.5,ROP=50.ROP down to 20. Pull wiper. 6/23/2016 6/23/2016 0.50 PROD2 DRILL WPRT T 200'wiper,PUW=36K,RBIH. 10,465.0 10,465.0 14:33 15:03 6/23/2016 6/23/2016 3.95 PROD2 DRILL DRLG T BOBD:1.65 BPM @ 3,790 PSI, 10,465.0 10,680.0 15:03 19:00 BHP=3,885 PSI,CTW=8.5K,FS=320, WOB=1.3,ROP=50. 6/23/2016 6/23/2016 0.50 PROD2 DRILL WPRT T Planned wiper trip.PUH.PUW= 10,680.0 9,900.0 19:00 19:30 34Klbs. 6/23/2016 6/23/2016 0.50 PROD2 DRILL WPRT T RBIH.SOW=7 Klbs.Clean trip in and 9,900.0 10,680.0 19:30 20:00 out. 6/23/2016 6/23/2016 0.75 PROD2 DRILL DRLG T BOBD:1.64 BPM @ 3,840 PSI, 10,680.0 10,717.0 20:00 20:45 BHP=3,940 PSI,CTW=7.5K,FS=400, WOB=1.0,ROP=50-60. Motor stalled. 6/23/2016 6/23/2016 1.00 PROD2 DRILL DRLG T Work free and PUH after motor stall. 10,717.0 10,719.0 20:45 21:45 49Klbs PUW,Restart. Second stall.PUH,PUW 45Klbs. Third stall,PUH with 41Klbs PUW. RBIH 6/23/2016 6/24/2016 2.25 PROD2 DRILL DRLG T Continue drilling ahead.1.59 BPM @ 10,719.0 10,840.0 21:45 00:00 3,890 PSI,BHP=3,940 PSI,CTW=6K, - FS=380,WOB=1.0-1.2Klbs,ROP=50- 60. 6/24/2016 6/24/2016 3.00 PROD2 DRILL DRLG T Continue drilling ahead. 1.59 BPM @ 10,840.0 11,080.0 00:00 03:00 3,805 PSI,BHP=3,920 PSI,CTW=4K, FS=388,WOB=1.6KIbs,ROP=60-90 FPH. 6/24/2016 6/24/2016 2.00 PROD2 DRILL WPRT T Wiper trip,PUW=32K,saw 10,500'to 11,080.0 11,080.0 03:00 05:00 10,700',log RA for+6.5'correction, RBIH.Saw same interval,cut pump rate to.5 bpm. Page 14/27 Report Printed: 7/11/2016 • • . t Operations Summary (with Timelog Depths) x , r, . k§. k 1L-24 ConOCCeh clips _ Rig: NABORS CDR2-AC Job: DRILLING SIDETRACK Time Log Start Depth Start Time End Time Dur(hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth(ftKB) 6/24/2016 6/24/2016 4.25 PROD2 DRILL DRLG T BOBD: 1.60 BPM @ 3,950 PSI, 11,080.0 11,480.0 05:00 09:15 BHP=3,960 PSI,CTW=4K, WOB=1.6K,ROP=100. 6/24/2016 6/24/2016 0.65 PROD2 DRILL WPRT T Wiper to 10,700',PUW=32K,RBIH. 11,480.0 11,480.0 09:15 09:54 6/24/2016 6/24/2016 0.40 PROD2 DRILL DRLG T BOBD:B1.60 PSI, @TW=3K PSI, 11,480.0 11,524.0 09:54 10:18 WOB=1.2K,ROP=50.Start pumping new mud system.BHA wiper @ 10,717',trouble getting started again, fault?ROP below 10'. 6/24/2016 6/24/2016 4.25 PROD2 DRILL DRLG P BOBD:1.60 BPM @ 3,925 PSI, 11,524.0 11,754.0 10:18 14:33 BHP=3,990 PSI,CTW=3K, WOB=1.2K,ROP=50.Start pumping new mud system.BHA wiper @ 10,717',trouble getting started again, fault?ROP below 10'.New mud at bit 11,748',no improvement.Off of trouble time. 6/24/2016 6/24/2016 0.45 PROD2 DRILL WPRT P 500'wiper,PUW=34K,RBIH. 11,754.0 11,754.0 14:33 15:00 6/24/2016 6/24/2016 3.00 PROD2 DRILL DRLG P BOBD: 1.60 BPM @ 3,680 PSI, 11,754.0 11,910.0 15:00 18:00 BHP=3,980 PSI,CTW=3K, WOB=1.5K,ROP=65.BHA wiper @ 11,812'. 6/24/2016 6/24/2016 0.50 PROD2 DRILL WPRT P Wiper trip from 11,910 to 10,900 ft. 11,910.0 11,910.0 18:00 18:30 PUW=33KIbs. RBIH.SOW=7Klbs. 6/24/2016 6/24/2016 3.25 PROD2 DRILL DRLG P BOBD: 1.61 BPM @ 3,600 PSI,FS= 11,910.0 12,055.0 18:30 21:45 375 psi BHP=4,000 PSI,CTW=3-5K, WOB=1.5K,ROP=40. 6/24/2016 6/24/2016 0.50 PROD2 DRILL WPRT P Wiper trip from 2055 to RBIHSOW 11500 6 Klbs. 12,055.0 12,055.0 21:45 22:15 PUW= . 6/24/2016 6/24/2016 1.50 PROD2 DRILL DRLG P BOBD: 1.62 BPM @ 3,770 PSI,FS= 12,055.0 12,135.0 22:15 23:45 370 psi BHP=4,020 PSI,CTW=-- 4Klbs to+3KIbs,WOB=1.5K, ROP=50. 6/24/2016 6/25/2016 0.25 PROD2 DRILL WPRT P Wiper trip from 12135 to 11600 ft. 12,135.0 12,135.0 23:45 00:00 PUW=32KIbs.RBIH.SOW=6 Klbs. 6/25/2016 6/25/2016 0.25 PROD2 DRILL WPRT P RBIH from wiper trip.SOW=6 Klbs. 12,135.0 12,135.0 00:00 00:15 6/25/2016 6/25/2016 1.75 PROD2 DRILL DRLG P BOBD: 1.61 BPM @ 3,615 PSI,FS= 12,135.0 12,219.0 00:15 02:00 370 psi BHP=4,030 PSI,CTW=-- 6KIbs to+3KIbs,WOB=0.5-1.0K, ROP=20-50. 6/25/2016 6/25/2016 0.50 PROD2 DRILL WPRT P 500 foot wiper trip to help weight 12,219.0 12,219.0 02:00 02:30 transfer.RBIH,start pumping beaded pills at 0.5ppb. 6/25/2016 6/25/2016 1.75 PROD2 DRILL DRLG P BOBD: 1.58 BPM @ 3,590 PSI,FS= 12,219.0 12,305.0 02:30 04:15 375 psi BHP=4,060 PSI,CTW=-- 6KIbs to+3KIbs,WOB=0.5-1.5K, ROP=20-50.Beads at bit at 12220 ft. Saw improvement in weight transfer and ROP.ROP increased to 80 FPH. 6/25/2016 6/25/2016 2.00 PROD2 DRILL WPRT P Wiper to determine hole condition,jog 12,305.0 8,888.0 04:15 06:15 10760'to 10,975',continue OOH. Reduce rate thru high gamma,no issues. Page 15/27 Report Printed: 7/11/2016 • . ef#,:i 4,,,,,, Operations Summary (with Timelog Depths) %� 1 L-24 ConocoPhiilips ifiska Rig: NABORS CDR2-AC Job: DRILLING SIDETRACK Time Log Start Depth Start Time End Time Dur(hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth(ftKB) 6/25/2016 6/25/2016 2.45 PROD2 DRILL TRIP P Tie-in RA for+8.5'correction,RBIH. 8,888.0 12,310.0 06:15 08:42 Stacked 2K @ 10,010',PU,RBIH. stacking @ 10,631-10,636',work pipe free,49K to pull free,PUH to 10,500'. RBIH,stacking @ 10,610',PU was clean,35K,RBIH,no issue.Call town, called TD.Continue in hole for corrected TD,tag bottom @ 12,310'. 6/25/2016 6/25/2016 3.90 PROD2 DRILL WPRT P Pump 10 x 10 sweeps and liner pill. 12,310.0 75.5 08:42 12:36 POOH laying in beads,chasing sweeps.Slight overpull thru 10,660'to 10,510'. Increase pump, POOH,jog @ 9,165'to 9,350',continue OOH, overpull @ 8,616'(milled DS Nip). Continue OOH.Small jog at surface for cuttings clean up. 6/25/2016 6/25/2016 3.00 PROD2 DRILL TRIP P Bump up,reset counter.RBIH to 75.5 10,500.0 12:36 15:36 laying completion fluid.Tie-in HRZ for +10'correction,log RA for zero correction,small bobble @ 9,108', 10,006',and 10,046',small jog @ 10,000'.Continue in hole to 10,500x. 6/25/2016 6/25/2016 2.90 PROD2 DRILL CIRC P Pump liner pill.POOH laying in 11.8 10,500.0 72.5 15:36 18:30 completion fluid,paint EOP flags @ 8,920'&5,400'.Continue OOH. 6/25/2016 6/25/2016 0.50 PROD2 DRILL OWFF P At surface,flow check.Static. 72.5 72.5 18:30 19:00 6/25/2016 6/25/2016 2.00 PROD2 DRILL PULD P PJSM.LD BHA#11 over dead well. 72.5 0.0 19:00 21:00 BHA in good shape.Bit has some broken cutters on the nose.Bit grade 2-1-BT-A-X-I-PN-TD. Clean and clear rig floor. 6/25/2016 6/26/2016 3.00 COMPZ2 CASING PUTB P PJSM.RU and run liner.Non ported 0.0 2,650.0 21:00 00:00 bull nose, 109 joints slotted,5.56'pup and liner top billet. *Kick while tripping drill.All safe. 6/26/2016 6/26/2016 0.75 COMPZ2 CASING PUTB P Finish picking up liner joints. 2,650.0 3,341.0 00:00 00:45 . 6/26/2016 " 6/26/2016 1.00 COMPZ2 CASING PULD P MU Coiltrak BHA.Test MWD.Stab 3,341.0 3,384.0 00:45 01:45 injector on well.Bump up and reset counters.Prepare to run in the hole. 6/26/2016 6/26/2016 2.50 COMPZ2 CASING RUNL P RIH with liner assembly,non ported 3,384.0 10,699.0 01:45 04:15 bullnose, 109 joints of slotted liner, 5.56'blank pup and liner top billet. PUW with shoe at window 35Klbs. WOB=(-)12KIbs.Continue in the hole. Starting taking weight at 10,560 ft.Tough hole conditions.Working liner down.46Klbs PUW.(-)16KIbs' WOB. Work liner down to 10,699 ft,lost PUW. PUW=27KIbs.Suspect running tool released from liner. 6/26/2016 6/26/2016 1.25 COMPZ2 CASING TRIP T POOH to inspect liner running BHA. 10,699.0 75.5 04:15 05:30 PUW=22Klbs. 6/26/2016 6/26/2016 2.25 COMPZ2 CASING PULD T PJSM.Space out.Strip up,LD MWD. 75.5 0.0 05:30 07:45 GS in good space,surface test with GS profile was also good.Discuss plan forward with town. Page 16/27 Report Printed: 7/11/2016 • • • M.- " �. Operations Summary (with Timelog Depths) i•t ":.. ►4 h 'fix ; 1L-24 ConocoPhitlips Rig: NABORS CDR2-AC Job: DRILLING SIDETRACK Time Log Start Depth Start Time End Time. Dur(hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth(ftKB) 6/26/2016 6/26/2016 3.25 COMPZ2 CASING SVRG T Service rig while waiting on Slick 0.0 0.0 07:45 11:00 Catch GS from Prudhoe. Injector maintenance,blow down choke, calibrate choke,perform BOP function test 6/26/2016 6/26/2016 0.75 COMPZ2 CASING PULD T PJSM.PU BHA#13,with BOT 3"Slick 0.0 44.5 11:00 11:45 Catch GS Spear.Stab on well.Test MWD. 6/26/2016 6/26/2016 1.75 COMPZ2 CASING TRIP T RIH w/BHA#13,CCL log over GLM 44.5 7,358.0 11:45 13:30 for depth control.PUH for weight check.PUW=29 Klbs,SOW=5.9 Klbs.Tag top of fish at 7348 ft. 6/26/2016 6/26/2016 0.50 COMPZ2 CASING FISH T Attempt to engage GS profile on top of 7,358.0 7,538.0 13:30 14:00 the aluminum billet with BOT Slick Catch GS spear.Unsuccessful after two attempts.Suspect GS profile is damaged.Discuss options with town. Made decision to POOH and try other fishing options. 6/26/2016 6/26/2016 1.00 COMPZ2 CASING TRIP T POOH with fishing BHA#13.PUW= 7,538.0 44.0 14:00 15:00 29 Klbs. 6/26/2016 6/26/2016 0.50 COMPZ2 CASING OWFF T Flow check well at surface.Static. 44.0 44.0 15:00 15:30 6/26/2016 6/26/2016 0.75 COMPZ2 CASING PULD T PJSM.Unstab.Break off and inspect 44.0' 0.0 15:30 16:15 GS.No damage observed on BHA/Slick Catch GS Spear. 6/26/2016 6/26/2016 2.00 COMPZ2 CASING WAIT T Wait on fishing tools from Deadhorse. 0.0 0.0 16:15 18:15 SIMOPS:Perform dropped object rig inspection and general rig maintenance.Discuss plan forward with town. 6/26/2016 6/26/2016 3.75 COMPZ2 CASING PULD T Confirmed plan forward for fishing 0.0 7,348.0 18:15 22:00 operations.PJSM.MU BHA#14 with 3"GS,3"GS Bait Sub,XO, 1"ITCO spear.Surface test MWD.Open EDC, Run in hole.Log CCL for depth control.Confirm BHA overpull limits. Tag up on fish. 6/26/2016 6/26/2016 0.50 COMPZ2 CASING FISH T Weight check.PUW=28 Klbs.Close 7,348.0 7,348.0 22:00 22:30 EDC.RIH to engage fish. 1st attempt:Set down 9.6KIbs WOB. PUH 36KIbs and broke over to PUW. 2nd attempt:Set down 9.OKIbs WOB. PUH 40KIbs and broke over to PUW. 3rd-6th attempts:Set down 11 Klbs WOB.PUH at PUW each time. Suspect grapples have failed or billet ID got to large to engage. POOH to inspect ITCO spear. 6/26/2016 6/26/2016 1.25 COMPZ2 CASING TRIP T Discuss with town. Open EDC,POOH 7,348.0 70.0 22:30 23:45 with BHA#14. 6/26/2016 6/27/2016 0.25 COMPZ2 CASING OWFF T Flow check at surface. 70.0 70.0 23:45 00:00 6/27/2016 6/27/2016 0.25 COMPZ2 CASING OWFF T Flow check at Surface.Static. 70.0 70.0 00:00 00:15 Page 17127 Report Printed: 7/11/2016 • • rtr Operations Summary (with Timelog Depths) 1 L-24 ConocoPhifGps Rig: NABORS CDR2-AC Job: DRILLING SIDETRACK Time Log - Start Depth Start Time End Time Dur(hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth(ftKB) 6/27/2016 6/27/2016 1.25 COMPZ2 CASING PULD T PJSM.Unstab injector.PU and 70.0 70.0 00:15 01:30 inspect 1"ITCO Spear.Spear body is intact,but grapple segments are missing. Break off GS tools and spear(BHA #14).MU 2-1/8"BOT motor and 1.81" 3 bladed junk mill below the FSV (BHA#15). 6/27/2016 6/27/2016 1.25 COMPZ2 CASING TRIP T RIH with BHA#15,BOT motor and. 70.0 7,348.0 01:30 02:45 1.81"mill.Dry tag fish at 7348 ft. 6/27/2016 6/27/2016 1.50 COMPZ2 CASING DISP T Displace hole from 11.8 ppg NaBr to 7,348.0 7,348.0 02:45 04:15 8.7 ppg FloPro in preparation for milling operations. 6/27/2016 6/27/2016 2.90 COMPZ2 CASING MILL T Close EDC.RIH and tag billet.Begin 7,348.0 7,348.5 04:15 07:09 milling.Stalled and restarted at 7347.88 ft.Pumping 1.5 BPM.WOB 0.15-0.3 Klbs. Seven total stall during milling operations,no more than 0.3K WOB before stall occurs,aluminum at shaker.No further progress,just stalling,confirm with town. 6/27/2016 6/27/2016 2.30 COMPZ2 CASING CIRC T Pump sweeps,circulate hole back to 7,348.5 75.5 07:09 09:27 KWF,POOH. 6/27/2016 6/27/2016 0.50 COMPZ2 CASING OWFF T Monitor well for flow,no flow. 75.5 75.5 09:27 - 09:57 6/27/2016 6/27/2016 1.30 COMPZ2 CASING PULD T PJSM.LD BHA#15,mill showed 75.5 44.5 09:57 11:15 polished ring at No-GO,check above CC,re-configure BHA.MU BHA#16 6/27/2016 6/27/2016 1.55 COMPZ2 CASING TRIP T RIH w/BHA#16,PUW=28K at 7,295', 44.5 7,348.0 11:15 12:48 tag fish while pumping @ 1 bpm, 7,348',set down 6K WOB,shut down pump,set down 9K WOB,-6K string. PU to 35K,40K,45K,50K pulled free. 6/27/2016 6/27/2016 3.20 COMPZ2 CASING PULL T POOH with fish at 10 fpm,pumping 7,348.0 5,470.0 12:48 16:00 across top,inside cased hole at 20 fpm.(Bottom of fish at 10699). 6/27/2016 6/27/2016 4.50 COMPZ2 CASING PULL T Full length of fish is inside tubing. 5,470.0 43.0 16:00 20:30 POOH 20 fpm,pumping across top. 30 minute flow check at surface. Static. 6/27/2016 6/27/2016 0.50 COMPZ2 CASING OWFF T 30 minute flow check at surface. 43.0 43.0 20:30 21:00 Static. 6/27/2016 6/27/2016 1.00 COMPZ2 CASING PULL T PJSM.Tag up,space out BHA. 43.0 0.0 21:00 22:00 Secure BHA in deployment rams. Unstab injector.Skid injector cart. Instal lift sub,pull BHA out of the hole, instal C plate and slip bowls.Set slips on first full joint of liner.Install dog collar,Secure fish. Slick Catch GS was fully engaged with the liner top billet fish.Removed billet with GS from liner assembly and moved to bench for inspection. 6/27/2016 6/28/2016 2.00 COMPZ2 CASING PULL T Prep floor to run liner.PJSM to 0.0 0.0 22:00 00:00 discuss LD liner. Begin laying down liner joints 109-69. Page 18/27 • Report Printed: 7/11/2016 • . 1 Operations Summary (with Timelog Depths) e #. ,.':k,.,:..,,',-.‘"-,4. . p 1 L-24 ConocoPhitlips Rig: NABORS CDR2-AC Job: DRILLING SIDETRACK Time Log Start Depth Start Time End Time Our(hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth(ftKB) 6/28/2016 6/28/2016 3.00 COMPZ2 CASING PULL T Continue to lay down liner joints.Stop 0.0 0.0 00:00 03:00 at jt 52.Strap first row in pipe shed. Continue laying down liner joints 52-1 including non ported bull nose. Note:Found grapple segments from 1"ITCO spear in bull nose. 6/28/2016 6/28/2016 1.25 COMPZ2 CASING PULD T Clear rig floor.PJSM.PU BHA#17 0.0 63.0 03:00 04:15 with 0.5°AKO motor and 2.73"NG HCC D331 mill. 6/28/2016 6/28/2016 4.00 COMPZ2 CASING TRIP T RIH with BHA#17 for clean-out run, 63.0 10,500.0 04:15 08:15 log HRZ for+16.5'correction,zero correction @ RA,RIH to 10,500'. Pump spacer. 6/28/2016 6/28/2016 1.00 COMPZ2 CASING CIRC T Circulate hole back to 8.8 ppg mud 10,500.0 10,500.0 08:15 09:15 6/28/2016 6/28/2016 0.90 COMPZ2 CASING TRIP T Continue in hole @ 1 bpm,stacking @ 10,500.0 10,636.0 09:15 10:09 10,525', 10.595', 10,614'and 10,636'. PUH,packing-off,cut pump cut,PUH to 10,495'.Pump rate.75 bpm, stacking 10,523',PUW=38K,packing- off,shut down pump,relax pipe,pull up,PUW=51 K. 6/28/2016 6/28/2016 1.25 COMPZ2 CASING WPRT T Wiper to TT,clean up hole above at 10,636.0 8,890.0 10:09 11:24 1,56 bpm,just small cutting across shaker,tie-in RA for+3.5'. 6/28/2016 6/28/2016 1.50 COMPZ2 CASING TRIP T RBIH for second attempt clean up 8,890.0 10,580.0 11:24 12:54 high gamma area,tag up 10,001', PUH,lower pump rate,continue in hole,stacking 10,514',work thru tight areas to 10,580'at.75 bpm.Call town, decide to make another,clean up jog, PUW=thru tight area 39K. 6/28/2016 6/28/2016 0.75 COMPZ2 CASING WPRT T Wiper to 10,150,PUW=36K.Town 10,580.0 10,150.0 12:54 13:39 called,keep working thru high gamma area,RBIH. 6/28/2016 6/28/2016 1.15 COMPZ2 CASING TRIP T Continue working trouble area at.85 10,150.0 10,611.0 13:39 14:48 bpm from 10,525'to 10,611',Make another clean up trip,try to increase pump rate,start packing off,decrease rate back to.80. 6/28/2016 6/28/2016 0.50 COMPZ2 CASING WPRT T Wiper to 10,200',PUW=37.RBIH,try 10,611.0 10,611.0 14:48 15:18 1 bpm thru trouble area. 6/28/2016 6/28/2016 2.50 COMPZ2 CASING TRIP T Continue working trouble area at.81 10,611.0 10,669.0 15:18 17:48 bpm from 10,575'to 10,669'before town had seen enough. 6/28/2016 6/28/2016 2.40 COMPZ2 CASING TRIP T Pump two 5 bbl hi vis sweeps,chase 10,669.0 62.4 17:48 20:12 to swab.Jog at 1,800 ft to 3,000 ft, nothing significant across shaker. Continue POOH. 6/28/2016 6/28/2016 1.50 COMPZ2 CASING TRIP T PJSM- PUD BHA#17.Mill 2.73"OD 62.4 0.0 20:12 21:42 no-go 6/28/2016 6/28/2016 1.15 PROD2 STK PULD T PJSM-MU/PD BHA#18,OHA Billet 0.0 72.8 21:42 22:51 assembly,MU to CoilTrak.Surface . test. 6/28/2016 6/29/2016 1.15 PROD2 STK TRIP T RIH with BHA#18 to 5,125 ft as of. 72.8 5,125.0 22:51 00:00 midnight. 6/29/2016 6/29/2016 0.75 PROD2 STK TRIP T Contiue RIH with BHA#18. 5,125.0 8,355.0 00:00 00:45 Page 19/27 Report Printed: 7/11/2016 • • Operations Summary (with Timelog Depths) 1 L-24 ConocoPhillips Rig: NABORS CDR2-AC Job: DRILLING SIDETRACK Time Log Start Depth Start Time End Time Dur(hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth(ftKB) 6/29/2016 6/29/2016 0.40 PROD2 STK DLOG T Tie in at HRZ for a plus 10 ft 8,355.0 9,417.0 00:45 01:09 correction.Close EDC.PUW 31k 6/29/2016 6/29/2016 1.25 PROD2 STK TRIP T RBIH pumps off,HS orientation,clean 9,417.0 10,431.8 01:09 02:24 thru window,stack weight 2.45k at 9,860 ft,PU 32k,RBIH 10 fpm,WOB 4k at 9,864 ft,PU 35k(Billet at 9,850 ft)RBIH 10 fpm from 9,840 ft, 1.4k to 1.8k WOB from 9,854 ft to 9,871 ft, continue RIH 6/29/2016 6/29/2016 0.20 PROD2 STK TRIP T 10,431.75 ft.Orient HS,pick up to 10,431.8 10,420.0 02:24 02:36 neutral,release off OHAB at 4,350 psi, stack 5.5k,top of billet at 10,420 ft. 6/29/2016 6/29/2016 2.10 PROD2 STK TRIP T POOH,PUW 31k,Open EDC at 8,200 10,420.0 72.8 02:36 04:42 ft 6/29/2016 6/29/2016 1.90 PROD2 STK PULD T PJSM-PUD/LD BHA#18 72.8 0.0 04:42 06:36 6/29/2016 6/29/2016 4.00 PROD2 STK PULD T PJSM.Change-out UQC,test,check 0.0 72.5 06:36 10:36 pack-offs.PD BHA#19.Test MWD. 6/29/2016 6/29/2016 2.85 PROD2 STK TRIP T RIH w/Drilling assembly, .5 ako 72.5 10,421.0 10:36 13:27 motor,RB Hughes bit.Tie-in HRZ for +10.5'correction,zero correction at RA,close EDC,PUW=32K.Dry tag billet@ 10,421'. 6/29/2016 6/29/2016 8.10 PROD2 STK KOST T Starting pump 1.55 bpm, RIH,stall, 10,421.0 10,440.0 13:27 21:33 PU restart.Attempt to lightly tag billet, stall three times. BHA wiper,try lower pump rate,small orientation change. Multiple stalls.Trough low side,time drill.back ream 30°ROHS up 10 ft. RBIH,stalling,weight transfer issue, pump bead pills.time drill per recommended practice 1,2,5, 10,20 fph.PUW 33k,RBIH,dry drift billet clean. 6/29/2016 . 6/30/2016 2.45 PROD2 DRILL DRLG T 10,440 ft. OBD 1.6 bpm at 3,446 psi 10,440.0 10,510.0 21:33 00:00 FS,BHP 3,905 psi,CWT 8.0k,WOB 1.7k,ROP 40,WHP 309, IA 40,OA 208 6/30/2016 6/30/2016 3.00 PROD2 DRILL DRLG T 10,510 ft..OBD 1.6 bpm at 3,646 psi, 10,510.0 10,630.0 00:00 03:00 BHP 3,884 psi,CWT 4.5k,WOB 2.2k, ROP 45,WHP 267,IA 66,OA 232 6/30/2016 6/30/2016 0.85 PROD2 DRILL WPRT T Wiper trip to window,PUW 34k,30 10,630.0 8,890.0 03:00 03:51 fpm at TF from 10,075 ft to 9,900 ft,no over pulls,200 ft jog at EOB. 6/30/2016 6/30/2016 0.15 PROD2 DRILL DLOG T Log RA marker fora plus 1.5 ft 8,890.0 8,910.0 03:51 04:00 correction. 6/30/2016 6/30/2016 0.80 PROD2 DRILL WPRT T Wiper back in hole,RIW 11.0k,clean 8,910.0 10,630.0 04:00 04:48 past billet at 9,850 ft,no problems thru high gama area to 10,075 ft,25 fpm at.5 bpm pump rate.clean past billet at 10,421 ft. 6/30/2016 6/30/2016 4.15 PROD2 DRILL DRLG T 10,630 ft. OBD 1,60 bpm at 3,700 psi 10,630.0 10,880.0 04:48 08:57 FS,BHP 3,914 psi,CWT 6.0k,WOB 1.6k,ROP 60,WHP 286,IA 64,OA 248. 6/30/2016 6/30/2016 0.75 PROD2 DRILL WPRT T 750'wiper trip,PUW=33K,RBIH. 10,880.0 10,880.0 08:57 09:42 Page 20/27 Report Printed: 7/11/2016 • • • (se;:.q 1 , - Operations Summary (with Timelog Depths) � t-, , 1 L-24 hitiips Rig: NABORS CDR2-AC Job: DRILLING SIDETRACK Time Log Start Depth Start Time End Time Dur(hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth(ftKB) 6/30/2016 6/30/2016 4.45 PROD2 DRILL DRLG T 10,880 ft. 3 9BD 1,62 bpm at.5 k,3,850 Wpsi 10,880.0 11,122.0 09:42 14:09 B 1.6k,ROP 55,WHP 293, IA 200,OA 350.Mini wiper @ 11,113'.Pull wiper early. 6/30/2016 6/30/2016 0.80 PROD2 DRILL WPRT T 800'wiper trip,PUW=35K,RBIH. 11,122.0 11,122.0 14:09 14:57 6/30/2016 6/30/2016 7.70 PROD2 DRILL DRLG T 11,122 ft. OBD 1,61 bpm at 3,950 psi 11,122.0 11,380.0 14:57 22:39 FS,BHP 3,945 psi,CWT 3.5 k,WOB 2.2k,ROP 50,IA 200,OA 350.High Gama at 11,110 ft,100 ft wiper at 11,200 ft,PUW 40k,broke over to 35k,RBIH no problems,broke out of high gama area at 11,220 ft. 6/30/2016 6/30/2016 1.20 PROD2 DRILL WPRT T Wiper trip for tie in,PUW 35k,chase 11,380.0 8,890.0 22:39 23:51 5x5 to window adjusting speed and TF accordingly thru problem areas and past billets,saw small spike at 10,116 ft,jog at EOB. 6/30/2016 7/1/2016 0.15 PROD2 DRILL DLOG T Log RA marker for 3.5 ft.correction 8,890.0 8,910.0 23:51 00:00 7/1/2016 7/1/2016 1.30 PROD2 DRILL WPRT T Wiper in hole adjusting speed,pump 8,910.0 11,380.0 00:00 01:18 rate and TF accordingly thru problem areas and past billets,stacked at 10,187 ft RIH 50 fpm, HS TF at 1.2 bpm,PUW 34k,stack at same at 20 fpm,HS TF at.5 bpm,PU clean,RBIH 25 fpm,70°L TF at.5 bpm,took weight 2k at 10,520 ft RIH 40 fpm,HS TF, 1.15 pbm,slow to 30 fpm, pumping 1 bpm.No proplem 11,100 ft to 11,250 ft 25 fpm at.8 bpm,RIW 7.2k. 7/1/2016 7/1/2016 3.85 PROD2 DRILL DRLG T 11,380 ft. OBD 1.6 bpm at 3,959 psi 11,380.0 11,630.0 01:18 05:09 FS,BHP 3,981 psi,CWT 5.0k,WOB 1.8k,ROP 48,WHP 145,IA 248,OA 396 "Mud swap-new mud out bit at 11,441 ft. 7/1/2016 7/1/2016 1.00 PROD2 DRILL WPRT T Wiper trip, PUW=35K,WOB spike @ 11,630.0 11,630.0 05:09 06:09 11,135'pack-off,RBIH,tight spots @ 10,790',10,825',and 11,130'. 7/1/2016 7/1/2016 6.75 PROD2 DRILL DRLG T 11,630 ft. OBD 1.6 bpm at 4,025 psi 11,630.0 12,030.0 06:09 12:54 FS,BHP 4,025 psi,CWT 3 k,WOB 1.8k,ROP 60,WHP 315,IA 175,OA 346.Mini wiper @ 11,986'.Started pumping 5 bbl beaded pills regiment for total of 25 bbls. 7/1/2016 7/1/2016 1.00 PROD2 DRILL WPRT T Wiper trip, PUW=36K,another WOB 12,030.0. 12,030.0 12:54 13:54 spike @ 11,135'pack-off,RBIH,no issues. 7/1/2016 7/1/2016 3.75 PROD2 DRILL DRLG T 12,030 ft. OBD 1.6 bpm at 4,090 psi 12,030.0 12,226.0 13:54 17:39 FS,BHP 4,060 psi,CWT 3 k,WOB 1.2k,ROP 55,WHP 335, IA 175,OA 346.Mini wiper @ 11,986'.Continue pumping 5 bbl beaded pills regiment for total of 15 bbls. 7/1/2016 7/1/2016 0.60 PROD2 DRILL WPRT T Wiper trip 800 ft for weight transfer, 12,226.0 12,226.0 17:39 18:15 PUW 36k, faulted into high gama at 12,194 ft. Page 21/27 Report Printed: 7/11/2016 • • -' Operations Summary (with Timelog Depths) Cortoc Phillips Rig: NABORS CDR2-AC Job: DRILLING SIDETRACK Time Log Start Depth Start Time End Time Dur(hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth(ftKB) 7/1/2016 7/1/2016 2.20 PROD2 DRILL DRLG T 12,226 ft. OBD 1.59 at 3,883 psi FS, 12,226.0 12,259.0 18:15 20:27 BHP 4,059 psi,CWT 0.0k,WOB 1.5k, ROP 16, WHP 330, IA 228,OA 379 7/1/2016 7/1/2016 2.60 PROD2 DRILL WPRT T 12,259 ft.Geo's called TD,PU,pump 12,259.0 8,730.0 20:27 23:03 10x10.Chase sweeps to swab adjusting speed and TF accordingly, pulled 42k at 9,985 ft,RBIH and stacked,lower pump rate to.7 bpm, PU 37k,pulled heavy to 9,950 ft, continue POOH,jog at EOB,pull 41.5k in pilot hole at 8,764 ft,RBIH 25 ft,PUW 34k,overpull to 45k at 8,730 ft,WOB-.85k,cuttings above,build low-vis pill. 7/1/2016 7/1/2016 0.70 PROD2 DRILL WPRT T 8,730 ft. RBIH to EOB,30 fpm 8,730.0 9,700.0 23:03 23:45 pumping 1.59 bpm from 9150 ft. to 9,700 ft. 7/1/2016 7/2/2016 0.25 PROD2 DRILL WPRT T 9,700 ft.PUH waiting for sweeps. 9,700.0 9,380.0 23:45 00:00 7/2/2016 7/2/2016 3.25 PROD2 DRILL WPRT T PUH 15 fpm,pump and Circulate 9,380.0 72.0 00:00 03:15 bottoms up 10x10 Lo/Hi sweep 1.7 bpm,nothing unusual across shaker. POOH,small spike at 9,133 ft,clean thru window and pilot hole,continue POOH to swab.Jog at 420 ft,coarse shale's unloading at shaker,bump up, reset counters. 7/2/2016 7/2/2016 1.80 PROD2 DRILL TRIP T RIH with BHA#19 72.0 8,365.0 03:15 05:03 7/2/2016 7/2/2016 0.25 PROD2 DRILL DLOG T Tie in at HRZ for plus 9.5 ft correction. 8,365.0 8,410.0 05:03 05:18 7/2/2016 7/2/2016 2.15 PROD2 DRILL TRIP T Continue in hole,saw weight @ 8,410.0 12,190.0 05:18 07:27 9,892',9,990', 10,495', 10,534', 10,790',10,824', 11,163', 11,206', 11,216', 11,248'&11,343'.Continue to 12,190'.Pump 40 bbl beaded liner pill. 7/2/2016 7/2/2016 3.45 PROD2 DRILL CIRC T POOH layingyflags completion 9 &Buids, 12,190.0 75.5 07:27 10:54 300'. Continue OOH. 7/2/2016 7/2/2016 1.00 PROD2 DRILL OWFF T Monitor well for flow,no flow.LD BHA 75.5 0.0 10:54 11:54 #19. 7/2/2016 7/2/2016 1.00 COMPZ2 CASING PUTB T Prep floor for liner runs. 0.0 0.0 11:54 12:54 7/2/2016 7/2/2016 2.80 COMPZ2 CASING PUTB T PJSM.MU Lower liner assembly:BN, 0.0 2,442.0 12:54 15:42 80 jts slotted,shorty deployment sleeve. 7/2/2016 7/2/2016 1.00 COMPZ2 CASING PULD T PJSM.MU BHA#20,change floats in 2,442.0 2,487.0 15:42 16:42 UQC,test MWD. 7/2/2016 7/2/2016 3.40 COMPZ2 CASING RUNL T RIH w/lower liner assembly,tie-in for 2,487.0 12,190.0 16:42 20:06 plus 6.6 ft correction at flag,PUW 36.5k,WOB-8.98k,RBIH,plus 2 ft correction at HRZ,continue in hole. Release off liner at 12,190 ft,PUW 32k,WOB-0.2k,reset counters,top of lower liner 9,747 ft.line up pump. 7/2/2016 7/2/2016 2.40 COMPZ2 CASING TRIP T POOH pumping over the top,paint 9,747.0 44.2 20:06 22:30 EOP flags at 8,900 ft and 7,900 ft. , continue OOH. Page 22/27 Report Printed: 7/11/2016 • • '!;•.:.,N...,.,: Operations Summary (with Timelog Depths) . i ,,'.;4.,-, , _ v� ?. 1 L-24 -y; Cortoccillips • Rig: NABORS CDR2-AC Job: DRILLING SIDETRACK Time Log Start Depth Start Time End Time Dur(hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth(ftKB) 7/2/2016 7/2/2016 0.50 COMPZ2 CASING OWFF T Monitor well for flow,no flow.PJSM- 44.2 44.2 22:30 23:00 LD BHA. 7/2/2016 7/3/2016 1.00 COMPZ2 CASING PUTB T LD BHA#20,prep floors to run liner. 44.2 0.0 23:00 00:00 PJSM-MU liner assembly. 7/3/2016 7/3/2016 1.85 COMPZ2 CASING PUTB T MU Ported bullnose,pup jt,25 jts 0.0 777.2 00:00 01:51 slotted,OH Anchored Billet,tripping drill. 7/3/2016 7/3/2016 1.60 COMPZ2 CASING PULD T PJSM-MU Upper AL1-02 liner 777.2 838.3 01:51 03:27 assembly to BHA#21,MU to CoilTrak, surface test. 7/3/2016 7/3/2016 3.00 COMPZ2 CASING RUNL T RIH w/Upper AL1-02 liner assembly, 838.3 9,751.0 03:27 06:27 EDC Open,tie-in for plus 10 ft correction at flag,down on pump, close EDC,PUW 32k,WOB-3.5k, RBIH to set depth,PUW=36K,orient for 60 degree kick-off,tag up on lower liner assembly @ 9,751',pressure up 3,200 psi,release from liner, PUW=32K. 7/3/2016 7/3/2016 2.00 COMPZ2 CASING TRIP P POOH w/BHA#21 9,751.0 55.5 06:27 08:27 7/3/2016 7/3/2016 1.05 COMPZ2 CASING PULD P Monitor well for flow,no flow.PJSM. 55.5 0.0 08:27 09:30 LD BHA#21. 7/3/2016 7/3/2016 2.50 PROD3 WHDBOP RURD P Prep for bi-weekly BOPE test.Load 0.0 0.0 09:30 12:00 coil,test inner reel iron,valve crew greased tree,grease stack. • 7/3/2016 7/4/2016 12.00 PROD3 WHDBOP BOPE P Perform bi-weekly BOP test,250/4100 0.0 0.0 12:00 00:00 psi,annular 2,500 psi,test witnessed by Guy Cook(AOGCC).Two failures, change out choke"A"lower and upper Blind/Shear ram bodies. 7/4/2016 7/4/2016 8.00 PROD3 WHDBOP BOPE T Continue testing BOPE,witnessed by 0.0 0.0 00:00 08:00 AOGCC Guy Cook.F/P both blind/shear rams,choke"A", C3,C4,R2,and H2S pit sensor. 7/4/2016 7/4/2016 1.75 PROD3 STK CIRC P LD test equipment.Circulate coil to 0.0 0.0 08:00 09:45 drilling mud. 7/4/2016 7/4/2016 0.95 PROD3 STK PULD P PJSM.MU BHA#22 0.0 72.2 09:45 10:42 7/4/2016 7/4/2016 2.00 PROD3 STK TRIP P RIH w/drilling assembly:2.0 AKO 72.2 8,900.0 10:42 12:42 motor and RR Hughes bit,tie-in for+9' correction,continue in hole to 8,900'. 7/4/2016 7/4/2016 1.05 PROD3 STK CIRC P Circulate well back to drilling mud. 8,900.0 8,973.0 12:42 13:45 Continue in hole,dry tag billet @ 8,973'. 7/4/2016 7/4/2016 3.50 PROD3 STK KOST P Time mill off billet @ 1 fph,then 2 fph, 8,973.0 9,022.0 13:45 17:15 Pump rate 1.52 bpm @ 3,395 psi, CTW=10,WOB=.4K.Aluminum across shaker.Off billet,drill to 9,022 ft,pump sweep,PUW 33k,dry drift billet area clean. • 7/4/2016 7/4/2016 3.50 PROD3 DRILL DRLG P Drill ahead AL1 build section: 1.70 9,022.0 9,275.0 17:15 20:45 bpm at 3,669 psi FS,BHP3,762 psi, CTW 10.0k,WOB 1.5k,ROP 60-80, WHP 289,IA 20,OA 188.EOB called, pump sweep. 7/4/2016 7/4/2016 2.00 PROD3 DRILL TRIP P POOH for lateral BHA,jog at 400 ft. 9,275.0 72.2 20:45 22:45 Page 23/27 Report Printed: 7/11/2016 • • '' Operations Summary (with Timelog Depths) rpt IL-24 Omoco'tsitiips a�rxa Rig: NABORS CDR2-AC Job: DRILLING SIDETRACK Time Log Start Depth Start Time End Time Dur(hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth(ftKB) 7/4/2016 7/5/2016 1.25 PROD3 DRILL PULD P PJSM-PUD BHA#22 72.2 72.2 22:45 00:00 7/5/2016 7/5/2016 0.50 PROD3 DRILL PULD P LD BHA#22,bit condition:4-1-BT-N-X 72.2 0.0 00:00 00:30 -I-PN-BHA,3 leading cutters broken, 1 plugged nozzle. 7/5/2016 _ 7/5/2016 2.10 PROD3 DRILL PULD P PJSM-MU/PD drilling BHA#23,0.4+° 0.0 72.2 00:30 02:36 motor and RB HCC bi-center bit, change out pack offs,MU to CoilTrak, surface test. 7/5/2016 7/5/2016 1.55 PROD3 DRILL TRIP P RIH with BHA#23 72.2 8,365.0 02:36 04:09 7/5/2016 7/5/2016 0.50 PROD3 DRILL DLOG P Tie in at HRZ for plus 10 ft.correction, 8,365.0 8,350.0 04:09 04:39 PUW 32k 7/5/2016 7/5/2016 0.50 PROD3 DRILL TRIP P RIH,clean thru window and past billet. 8,350.0 9,275.0 04:39 05:09 7/5/2016 7/5/2016 1.10 PROD3 DRILL DRLG P 9,275 ft. OBD 1.66 bpm at 3,644 psi 9,275.0 9,328.0 05:09 06:15 FS,BHP 3,784 psi,CWT 9.0k,WOB 1.2k,ROP 60,WHP 271, IA 0,OA 116. PU to swap from Gen power to ' Highline. 7/5/2016 7/5/2016 4.00 PROD3 DRILL DRLG P 9,328 ft.BOBD 1.68 bpm at 3,692 psi 9,328.0 9,670.0 06:15 10:15 FS.BHP 4,214 psi,CWT 7.7k,WOB 2.1k,ROP 73. 7/5/2016 7/5/2016 0.25 PROD3 DRILL WPRT P Wiper from 9,670'to 9,000'.PU 9,670.0 9,000.0 10:15 10:30 weight=33k,1.7 BPM.Pumped sweep. 7/5/2016 7/5/2016 0.25 PROD3 DRILL WPRT P RBIH to 9,670'. 9,000.0 9,670.0 10:30 10:45 7/5/2016 7/5/2016 4.80 PROD3 DRILL DRLG P Drill ahead from 9,670'.Pumped 9,670.0 10,070.0 10:45 15:33 sweep @ 9,800'.PU,swap back to Highline power.Good parameters so continuing with mud system#6(1915' drilled,8.9 ppg,0.9%DS, LSRV 40K) so lat TD(11,750')is attainable with mud system#7. 7/5/2016 7/5/2016 0.45 PROD3 DRILL WPRT P Wiper from 10,070'to 9,070'.PU 10,070.0 9,070.0 15:33 16:00 weight=34k, 1.7 BPM. Pumped sweep. 7/5/2016 7/5/2016 0.35 PROD3 DRILL WPRT P RBIH to 10,070'. 9,070.0 10,070.0 16:00 16:21 7/5/2016 7/5/2016 4.65 PROD3 DRILL DRLG P Drill ahead from 10,070'. 10,070.0 10,470.0 16:21 21:00 **Mud swap,new mud out bit at 10,383 ft. 7/5/2016 7/5/2016 0.75 PROD3 DRILL WPRT P Wiper for tie in,PUW 33k,jog at EQB 10,470.0 8,890.0 21:00 21:45 7/5/2016 7/5/2016 0.20 PROD3 DRILL DLOG P Log RA for plus 4.0 ft correction,RIH. 8,890.0 8,910.0 21:45 21:57 7/5/2016 7/5/2016 0.65 PROD3 DRILL WPRT P Wiper in hole,RIW 8.5k 8,910.0 10,470.0 21:57 22:36 7/5/2016 7/6/2016 1.40 PROD3 DRILL DRLG P 10,470 ft.OBD 1.7 bpm at 3,735 psi 10,470.0 10,618.0 22:36 00:00 FS,BHP 3,845 psi,CWT 5.3k,WOB 1.9k,ROP 90,WHP 444, IA 139,OA 321 7/6/2016 7/6/2016 2.50 PROD3 DRILL DRLG P 10,618 ft. OBD 1.70 bpm at 3,720 psi 10,618.0 10,870.0 00:00 02:30 FS,BHP 3,886 psi,CWT 3.6k,WOB 1.7k,ROP 115,WHP 447, IA 188,OA 338. Page 24/27 Report Printed: 7/11/2016 • I Operations Summary (with Timelog Depths) rpt � ,,i.<,: 1L-24 ConocoPhi[lips '= Rig: NABORS CDR2-AC Job: DRILLING SIDETRACK Time Log Start Depth Start Time End Time Dur(hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth(ftKB) 7/6/2016 7/6/2016 0.45 PROD3 DRILL WPRT P Wiper up hole,PUW 37k. 10,870.0 9,570.0 02:30 02:57 7/6/2016 7/6/2016 0.45 PROD3 DRILL WPRT P Wiper in hole,RIW 8.2k 9,570.0 10,870.0 02:57 03:24 7/6/2016 7/6/2016 3.85 PROD3 DRILL DRLG P 10,870 ft.OBD 1.68 bpm at 3,718 psi 10,870.0 11,270.0 03:24 07:15 FS,BHP 3,897 psi,CWT 4.5k,WOB 1.1k,ROP 122,WHP 458, IA 226,OA 364 7/6/2016 7/6/2016 0.50 PROD3 DRILL WPRT P Wiper up hole from 11,270 to 10,070'. 11,270.0 10,062.0 07:15 07:45 PUW 38k. 7/6/2016 7/6/2016 0.50 PROD3 DRILL WPRT P RBIH to 11,270'.RIW 8.8k. 10,062.0 11,270.0 07:45 08:15 7/6/2016 7/6/2016 2.75 PROD3 DRILL DRLG P 11,270'.BOBD 1.69 bpm @ 3898 psi 11,270.0 11,540.0 08:15 11:00 FS,BHP 4370 psi,WOB 1.6k,ROP 87 FPH. 7/6/2016 7/6/2016 0.25 PROD3 DRILL WPRT P Wiper up hole from 11,540'to 10,740 11,540.0 10,740.0 11:00 11:15 7/6/2016 7/6/2016 0.25 PROD3 DRILL WPRT P RBIH to 11,540'.RIW 6.6k.Minimal 10,740.0 11,540.0 11:15 11:30 tbg wt change seen @ 10,790'; 10,832';10,999'. 7/6/2016 7/6/2016 1.25 PROD3 DRILL DRLG P 11,540'.BOBD 1.7 @ 3887 psi FS, 11,540.0 11,592.0 11:30 12:45 BHP 4395 psi,WOB-3 to-5k,ROP 20 -90 FPH.Stacking,multiple(9)PUs. 7/6/2016 7/6/2016 0.25 PROD3 DRILL WPRT P BHA wiper,PUW 38k. 11,592.0 11,592.0 12:45 13:00 7/6/2016 7/6/2016 0.50 PROD3 DRILL DRLG P 11,592'BOBD.Stacking,multiple(5) 11,592.0 11,600.0 13:00 13:30 PUs. 7/6/2016 7/6/2016 0.25 PROD3 DRILL WPRT P 500 ftwiperto 11,100',PUW 39k. 11,600.0 11,600.0 13:30 13:45 7/6/2016 7/6/2016 0.75 PROD3 DRILL DRLG P 11,600'BOBD. 1.69 BPM @ 3888 psi 11,600.0 11,609.0 13:45 14:30 FS,BHP 4395 psi,WOB-4.5k,ROP 25 FPH.Purposely cross cut A5 up into the A6,TD called at 11,609'.PUH while mixing&pumping 15 x 20 sweep. 7/6/2016 7/6/2016 1.00 PROD3 DRILL WPRT P Sweep out of bit,POOH chasing 11,609.0 9,306.0 14:30 15:30 sweep to swab(wiper trip). 1.77 BPM. 7/6/2016 7/6/2016 0.10 PROD3 DRILL WPRT P Jog in open hole to clean-up prior to 9,306.0 9,504.0 15:30 15:36 entering build area. 1.78 BPM. 7/6/2016 7/6/2016 1.90 PROD3 DRILL WPRT P Cont POOH for swab wiper trip,WOB 9,504.0 72.0 15:36 17:30 negative 0.7 pull @ billet(8,973'). 7/6/2016 7/6/2016 1.50 PROD3 DRILL TRIP P Bump up,reset counters,RBIH 72.0 8,340.0 17:30 19:00 7/6/2016 7/6/2016 0.25 PROD3 DRILL DLOG P Tie at HRZ for plus 15 ft correction, 8,360.0 8,410.0 19:00 19:15 PUW 29k. 7/6/2016 7/6/2016 1.65 PROD3 DRILL TRIP P RBIH,clean thru pilot hole,window 8,410.0 11,580.0 19:15 20:54 and past billet. 7/6/2016 7/6/2016 2.85 PROD3 DRILL DISP P POOH laying in 11.8 ppg beaded liner 11,580.0 72.0 20:54 23:45 pill/completion fluid to surface.EOP flags at 8,500 ft and 5,800 ft. 7/6/2016 7/7/2016 0.25 PROD3 DRILL OWFF P On surface,monitor well for flow. 72.0 72.0 23:45 00:00 Discrepency in MW out 11.3 ppg measured, 11.8 ppg MW in measured. 7/7/2016 7/7/2016 0.65 PROD3 DRILL OWFF P Monitor well for flow,well appears 72.0 72.0 00:00 00:39 dead,concerns of low weight of mud out.Confer with town. Page 25/27 Report Printed: 7/11/2016 a • . (t;..6.:,:,,„ Operations Summary (with Timelog Depths) ;Joct&' 1L-24 ConacoPhillips Al.M Aa Rig: NABORS CDR2-AC Job: DRILLING SIDETRACK Time Log Start Depth Start Time End Time Dur(hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth(ftKB) 7/7/2016 7/7/2016 1.10 PROD3 DRILL TRIP T RIH to 5,000 ft.MW in 11.8/MW out 72.0 5,000.0 00:39 01:45 11.4 at 500 ft measured, 11.8/11.6 at 1,000 ft, 11.8 in/11.7 out at 2,000 ft, 11.8 in/11.7 out at 3,000 ft, 11.8 in/ 11.8 out at 4,500 ft all measured weights. 7/7/2016 7/7/2016 0.75 PROD3 DRILL CIRC T 5,000 ft.MW 11.8 ppg in/ MW 11.8 5,000.0 72.2 01:45 02:30 ppg out measured,POOH. 7/7/2016 7/7/2016 0.50 PROD3 DRILL OWFF T On surface,monitor well for flow, 11.8 72.2 72.2 02:30 03:00 ppg in/11.8 ppg out. PJSM-LD BHA over dead well. 7/7/2016 7/7/2016 0.85 PROD3 DRILL PULD P LD BHA#23,check pipe above CTC, 72.2 0.0 03:00 03:51 mild gouging 20 ft above CTC, bit condition: 1-1-PN-N-X-I-NO-TD 7/7/2016 7/7/2016 0.40 COMPZ3 CASING PUTB P Prep floors to run liner.PJSM-MU 0.0 0.0 03:51 04:15 liner 7/7/2016 7/7/2016 1.75 COMPZ3 CASING PUTB P MU 33 jts slotted liner 0.0 1,010.6 04:15 06:00 7/7/2016 7/7/2016 0.50 COMPZ3 CASING PUTB P Crew change,valve check,check liner 1,010.6 1,010.6 06:00 06:30 in pipe shed,PJSM-MU liner 7/7/2016 7/7/2016 2.50 COMPZ3 CASING PUTB P MU remaining 53 jts slotted liner(86 1,010.6 2,974.1 06:30 09:00 total)followed by 11 jts of solid liner. Clean rig floor. 7/7/2016 7/7/2016 1.00 COMPZ3 CASING PUTB P PJSM.PU&MU MWD&SBR.Test 2,974.1 2,974.1 09:00 10:00 MWD. 7/7/2016 7/7/2016 2.50 COMPZ3 CASING RUNL P RIH BHA#24(liner+SBR).Stop @ 2,974.1 11,320.0 10:00 12:30 painted flag(8818.3'),BHA just above window(+3.89 ft correction). 7/7/2016 7/7/2016 0.50 COMPZ3 CASING RUNL P Attempt to tie-in to HRZ,stacking out. 11,320.0 11,579.0 12:30 13:00 Work pipe down hole.PUH to second painted flag,BHA-66'off bottom (missed it while RIH).+1.76 ft ' correction 7/7/2016 7/7/2016 0.25 COMPZ3 CASING RUNL P RBIH,work pipe down to set depth. 11,579.0 11,588.0 13:00 13:15 7/7/2016 7/7/2016 0.25 COMPZ3 CASING RUNL P PU 40k to neutral weight.Pump 1.5 11,588.0 11,588.0 13:15 13:30 BPM to release off liner. PU,still pulling heavy,RBIH,PU. Released from liner.RBIH while pumping to push liner back down to required set depth. 7/7/2016 7/7/2016 0.50 COMPZ3 CASING TRIP P Release off liner,PUH to tie-in @ HRZ 11,588.0 8,345.0 13:30 14:00 (+3 ft correction). 7/7/2016 7/7/2016 0.75 COMPZ3 CASING DISP P RBIH&swap well to seawater. 8,345.0 8,571.0 14:00 14:45 7/7/2016 7/7/2016 1.25 COMPZ3 CASING TRIP P POOH while pumping seawater. 8,571.0 2,500.0 14:45 16:00 7/7/2016 7/7/2016 1.10 DEMOB WHDBOP FRZP P Pump freeze protect from 2,500'to 2,500.0 44.2 16:00 17:06 surface. POOH 7/7/2016 7/7/2016 1.90 DEMOB WHDBOP PULD P PJSM-PUD BHA#24,LD liner 44.2 0.0 17:06 19:00 running tools,pull checks. 7/7/2016 7/7/2016 1.50 DEMOB WHDBOP MPSP P Bring in BPV equipment,PJSM, RU 0.0 0.0 19:00 20:30 BPV equipment,lubricate in BPV,test from below good,RDMO BPV equipment. Page 26/27 Report Printed: 7/11/2016 1 • • Operations Summary (with Timelog Depths) is 1 L-24 { CanocoPhi1 lips' iLKka Rig: NABORS CDR2-AC Job: DRILLING SIDETRACK Time Log Start Depth Start Time End Time Dur(hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth(ftKB) 7/7/2016 7/7/2016 3.00 DEMOB WHDBOP RURD P PJSM-Install nozzle,jet stack,flush 0.0 0.0 20:30 23:30 surafce lines,blow down steam heaters,blow down surface lines,coil and TT lines,freeze protect tree, begine RD check list,complete off loading fluids from rig. 7/7/2016 7/8/2016 0.50 DEMOB WHDBOP NUND P PJSM-ND BOPE,torque checked,2 0.0 23:30 00:00 bolts loose around SSV flange(30 min) Rig released at 00:00 on 07/08/2016 Page 27/27 Report Printed: 7/11/2016 \G\,1, -OCCE, RECEIVED • • --1CI Cs) AV 17 '115 WELL LOG TRANSMITTAL#903232310 To: Alaska Oil and Gas Conservation Comm. May 11, 2016 Attn.: Makana Bender 333 West 7th Avenue, Suite 100 DATA LOGGED Anchorage, Alaska 99501 s h'BENDER K RE: Perforation Record: 1L-24 Run Date: 4/19/2016 The technical data listed below is being submitted herewith. Please address any problems or concerns to the attention of: Chris Gullett, Halliburton Wireline &Perforating, 6900 Arctic Blvd., Anchorage, AK 99518 FRS_ANC@halliburton.com 1L-24 Digital Data in LAS format, Digital Log Image file 1 CD Rom 50-029-22170-00 Perforation Record (Field Print) 1 color log 50-029-22170-00 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING A COPY OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: Halliburton :,,,�,• -,.�--• - _,._.,.� Wireline&Perforating Attn: Chris Gullett 6900 Arctic Blvd. Anchorage, Alaska 99518 SCANNED Office: 907-273-3527 Fax: 907-273-3535 FRS_ANC@halliburton.com Date: Signed: �di „X„ ,���= • • ,oFTR . g�\-,1//7,'"s THE STATE Alaska Oil and Gas 0f/` TAsKA Conservation Commission � = 333 West Seventh Avenue GOVERNOR BILL WALKER Anchorage, Alaska 99501-3572 Main: 907.279.1433 OF ALAS Fax: 907.276.7542 www.aogcc.alaska.gov Keith Herring CTD Engineer ConocoPhillips Alaska, Inc. -s cjr 0 ( P.O. Box 100360 Anchorage, AK 99510-0360 Re: Kuparuk River Field, Kuparuk River Oil Pool, KRU 1L-24 Permit to Drill Number: 191-066 Sundry Number: 316-187 Dear Mr. Herring: Enclosed is the approved application for sundry approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the AOGCC grants for good cause shown, a person affected by it may file with the AOGCC an application for reconsideration. A request for reconsideration is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. Sincerely, dyk Cathy . Foerster Chair DATED this ay of April, 2016. RBDMS 1.k.- APR 0 5 2016 • • RECEIVED STATE OF ALASKA • ALASKA OIL AND GAS CONSERVATION COMMISSION MAR 10 2016 APPLICATION FOR SUNDRY APPROVALS o `^-kica//6 20 AAC 25.280 AOGGC 1.Type of Request: Abandon ❑ Plug Perforations 0 • Fracture Stimulate ❑ Repair Well ❑ Operations shutdown❑ Suspend ❑ Perforate ❑ Other Stimulate ❑ Pull Tubing ❑ Change Approved Program❑ Plug for Redrill Q • Perforate New Pool ❑ Re-enter Susp Well ❑ Alter Casing ❑ Other: Cement Squeeze 2.Operator Name: 4.Current Well Class: 5.Permit to Drill Number. ConocoPhillips Alaska, Inc. Exploratory ❑ Development Q • 191-066 • 3.Address: Stratigraphic ❑ Service ❑ 6.API Number. P.O.Box 100360 Anchorage,AK 99510-0360 50-029-22170-00 • 7.If perforating: 8 Well Name and Number. What Regulation or Conservation Order governs well spacing in this pool? N/A - Will planned perforations require a spacing exception? Yes ❑ No Q KRU 1L-24 9.Property Designation(Lease Number): 10.Field/Pool(s): ADL 25664 - Kuparuk River Field/Kuparuk River Oil Pool • 11. PRESENT WELL CONDITION SUMMARY Total Depth MD(ft): Total Depth TVD(ft): Effective Depth MD: Effective Depth TVD: MPSP(psi): Plugs(MD): Junk(MD): 9241' • 6287' • 9155' 6232' 3014 " None None Casing Length Size MD TVD Burst Collapse Conductor 78' 16" 122' 122' 1640 670 Surface 5038' 9-5/8" 5081' 3610' 3520 2220 Production 9213' 7" 9241' 6287' 4980 4320 Perforation Depth MD(ft): Perforation Depth TVD(ft): Tubing Size: Tubing Grade: Tubing MD(It): 8735'-8782' 5966'-5996' 8920'-8949' 6084'-6102' 3-1/2" 9.3#,L-80 8655'MD,5914'TVD 9010'-9029' 6141'-6153' Packers and SSSV Type: Packer-Baker FHL Retrievable Packer Packers and SSSV MD(ft)and TVD(ft): 8386'MD!5741'TVD Packer-Baker FHL Packer 8491'MD!5809'TVD Packer-TIW HM-1 Retrievable Packer 8604'MD 15882'TVD No SSSV 12.Attachments: Proposal Summary ❑ Wellbore schematic Q 13.Well Class after proposed work: Detailed Operations Program ❑ BOP Sketch ❑ Exploratory ❑ Stratigraphic ❑ Development 0 Service ❑ 14.Estimated Date for 15.Well Status after proposed work: 4/1/2016 Commencing Operations: OIL ❑ WINJ ❑ WDSPL ❑ Suspended ❑ • 16.Verbal Approval: Date: GAS ❑ WAG ❑ GSTOR ❑ SPLUG ❑ Commission Representative: GINJ ❑ Op Shutdown ❑ Abandoned ❑ 17. I hereby certify that the foregoing is true and the procedure approved herein will not be deviated from without prior written approval. Contact Keith Herring @ 263-4321 Email Keith.E.Hen-ing(a�conocophilliips.com Printed Name Keith Herring Title CTD Engineer 3/7//6' Signature Phone: 263-4321 Date COMMISSION USE ONLY Conditions of approval: Notify Commission so that a representative may witness Sundry Number. 7 Plug Integrity ❑ BOP Test Mechanical Integrity Test ❑ Location Clearance ❑ Other: Bop 1-c51' to ‘ 5o1:2 n5; ZSdo 5• ffrye vlar reVeva fee- 'x-' �' �' tJ/fCl�'►4 G P Iv plactmev't aPpa-ovr4 per �a.�ttf C ZS. lIZ Ci Post Initial Injection MIT Req'd? Yes ❑ No [� Spacing Exception Required? Yes ❑ No Subsequent Form Required: 119.-4,0 RBDMS fit'APR 0 5 2016 APPROVED SY � Approved by: �. � O MISSIONER THE COMMISSION Date: �j�•- ��Q • Sucltrni Foim ani Form 10-403--vised 11/2015 Orct.v4pII� jd for 12 months from the date of approval. / Attachm nts in Duplicate VTL 414 11 �laa�ld s./��� • • KRU 1L-24 CTD Summary for Plugging Sundry (10-403) Summary of Operations: KRU well 1 L-24 is a Kuparuk A-sand and C-sand producer equipped with 3-1/2" tubing and 7" production casing. The CTD sidetrack will utilize two laterals to target the A5 sand to the southeast and northwest of 1 L-24. The laterals will be supported by injectors 1 L-18 and 2E- 05. Prior to CTD operations, E-Line will punch 2' of holes in the 3-1/2" tubing tail at 8626' MD and the "D" nipple at 8621' MD will be milled out to a 2.80" ID. The existing A-sand and C-sand perforations will be squeezed with cement and the 3-1/2" tubing tail will be cemented in place . to provide a means to kick out of the 7" casing. ConocoPhillips requests a variance from the requirements of 20 AAC 25.112(c)(1) to plug the A-sand and C-sand perforations in this manner. Following the cement squeeze Nabors CDR2-AC will drill a pilot hole to 8905' MD and set a mechanical whipstock in the 2.80" pilot hole to kick off at 8875' MD. Both laterals will be completed with 2-3/8" slotted liner from TD with the second lateral liner top located inside the 3-1/2" tubing tail. Using the maximum formation pressure in the area of 3619 psi in 2E-05, the maximum potential surface pressure, assuming a gas gradient of 0.1 psi/ft, would be 3014 psi. CTD Drill and Complete 1L-24 Laterals: May 2016 Pre-CTD Work 1. RU Slickline: Obtain SBHP, dummy off gas lift mandrels, and pressure test. 2. RU E-line: Punch 2' of holes in the 3'/z" tubing tail at 8626' MD. 3. RU Pumping Unit: perform injectivity test down the tubing. 4. RU Service Coil: Mill out "D" nipple and cement squeeze the A-sand and C-sand perforations up to the holes in the tubing tail. 5. RU Slickline: Tag top of cement and pressure test cement. 6. Prep site for Nabors CDR2-AC and set BPV. Riq Work 1. MIRU Nabors CDR2-AC rig using 2" coil tubing. NU 7-1/16" BOPE, test. 2. 1 L-24A Sidetrack (A5 sand - Southeast) a. Drill 2.80" high-side pilot hole through cement to 8905' MD b. Caliper pilot hole c. Set top of whipstock at 8875' MD d. Mill 2.80" window at 8875' MD. e. Drill 3" bi-center lateral to TD of 13400' MD. f. Run 2%" slotted liner with an aluminum billet from TD up to 8970' MD. 3. 1 L-24AL1 Lateral (A5 sand - Northwest) a. Kick off of the aluminum billet at 8970' MD. b. Drill 3" bi-center lateral to TD of 11750' MD. c. Run 2%" slotted liner with deployment sleeve from TD up to 8640' MD. Page 1 of 2 3/7/2016 4. Freeze proect, set BPV, ND BOPE, and RDMO Nabors CRD2-AC. Post-Riq Work 1. PuII BPV 2. Obtain SBHP 3. Install gas lift design 4. Return to production Page 2 of 2 3/7/2016 1L-24 Proposed CTD Schematic Modified by KEH 3/2/16 3-1/2"9.3#J-55 EUE 8rd Tubing to surface 16"62#H-40 —.N. shoe @ 122'MD 3-1/2"Camco MMG gas lift mandrel @ 3339',4994',6220', 7200',7871',8299MD 9-5/8"36#J-55 shoe @ 5081'MD 1.1 Baker 80-40 PBR @ 8363 MD(4.0"ID) Baker Fl-IL packer @ 8386'MD(2.93"ID) 3-1/Z'Camco DS nipple @ 8573"MD(2.875'min ID) Baker Poorboy Overshot @ 8456'MD(3.00"min ID) Baker 80-40 PBR @ 8477'MD(2.98"ID) Baker FHL packer @ 8491'MD(2.93"ID) 3-1/2"Camco DS nipple @ 8573"MD(2.812"min ID) "Ill TIW Seal Assy @ 8590'MD(3.00"ID) 11.1111111 TIW PBR @ 8591'MD(3.0T ID) TIW HM-1 Retrievable Packer @ 8604'MD(3.5"ID) 111111 3-1/2"Camco D landing nipple @ 8621"MD(2.75"min ID) 3-1/Z SOS @ 8654'MD(8649'PDC) , 1111 C-sand perfs 8735'-8782'MD KOP @ 8875'PDC ‘‘` 1 L-24AL1 wp01(A5 sand-Northwest) TD @ 11,750'MD Top of liner @8640 MD A-sand perfs 8920'-8949 MD ---- ..................t::: 9010'-9029'MD 7"26#J-55 shoe @ -;=;11-1-0100000 9241'MD 1 L-24A wp03(A5 sand-Southeast) TD @ 13,400'MD Liner Billet @ 8970'MD ypL b KUP PROD 1 L-24 ConocoPhillips ; Well Attributes Max Angle&MD TD Alaska Inc. Wellbore API/UWI Field Name Wellbore Status not I°) MD(ft(B) Act Btm(ftKB) aCmnadtx36pa 500292217000 KUPARUK RIVER UNIT PROD 53.31 4,700.00 9,241.0 --- Comment H2S(ppm) Date Annotation End Date KB-Grd(ft) Rig Release Date 1L-24,5/12/20158.50:55 AM SSSV:NONE 75 11/8/2014 Last WO: 12/17/2013 42.99 5/23/1991 Vertical schematic(actual) Annotation Depth(ftKB) End Date Annotation Last Mod By End Date - --.-...- Last Tag:SLM 8,938.0 5/11/2015 Rev Reason:TAG hipshkf 5/12/2015 HANGER;39.2 1M Casing Strings Casing Description OD(in) ID(in) Top(ftKB) Set Depth(ftKB) Set Depth(ND)... WtlLen(I...Grade Top Thread CONDUCTOR 16 15.062 44.0 122.0 122.0 62.50 H-40 WELDED Casing Description OD(in) ID(in) Top(ftKB) Set Depth(ftKB) Set Depth(ND)... Wt/Len(1...Grade Top Thread SURFACE 95/8 8.921 43.0. 5,081.2 3,610.2 36.00 J-55 BTC Casing Description OD(in) ID(in) -Top(ftKB) 'Set Depth(ftKB) Set Depth(ND)....Wt/Len(I...Grade Top Thread PRODUCTION 7 6.276 28.31 9,240.9 6,286.8 26.00 J-55 BTC-MOD Tubing Strings Tubing Description String Ma...I ID(in) 'Top(MB) I Set Depth(ft..f Set Depth(ND)(...I Wt(lb/ft) 'Grade 'Top Connection TUBING WO-2013 31/2 2.992 39.2 846441 5,791.9 9.30 L-80 EUE-m .n.AJ CONDUCTOR;44.0-122.0- -"'-Is.n..u"Completion Details Nominal ID Top(ftKB) Top(ND)(ftKB) Top Incl(°) Item Des Com (in) GAS LIFT;3,338.6 392 39.2 0.08 HANGER FMC Gen IV TUBING HANGER 2.992 8,355.3 5,721.4 49.72 LOCATOR BAKER LOCATOR SUB 2.990 .8,356.3 5,722.0 49.72 SEAL ASSY 'BAKER SEAL ASSY-Space out above PBR locator sub 2.990 "Actual space out" 7.08'locator above PBR 8,363.4 5,726.6 49.72 PBR BAKER 80-40 POLISH BORE RECEPTACLE 40,000 4.000 GAS LIFT;4,994.3 -. Shear force 8,385.8 5,741.1 49.72 PACKER BAKER FHL RETRIEVABLE PACKER 60,000 PSI Shear 2.930 Release 8,438.5 5,775.2 49.75 NIPPLE CAMCO"DS"NIPPLE 2.875" 2.875 SURFACE;43.0-5,0812-4 4 8,456.1 5,786.6 49.76 OVERSHOT BAKER POORBOY OVERSHOT 6"OD x 3.62"ID 3.000 Swallowed 6.84'of tbg stub. Tubing Description String Ma...ID(in) Top(MB) -Set Depth(ft..Set Depth(ND),...rt(lb/ft) Grade Top Connection TUBING WO-2004 31/2' 2.9921 8,457.6 8,602.31 5,880.91 9.301 J-55 [op AB MOD GAS LIFT;6,219.9 Completion Details II Nominal ID Top(ftKB) Top(ND)(ftKB) Top Incl(°) Item Des Com (in) 8,476.0 5,799.4 49.78 SEAL ASSY BAKER 80-40 SEAL ASSEMBLY 2.980 GAS LIFT;7,199.4 8,477.3 5,800.2 49.78 PBR BAKER 80-40 PBR 2.980 8,491.0 5,809.) 49.79 PACKER BAKER FHL PACKER 2.930 8,572.5 5,861.6 49.89 NIPPLE CAMCO DS NIPPLE WITH 2.72"NO-GO 2.812 GAS LIFT;7,870.9 _ 8,589.6 5,872.6 49.92 SEAL ASSY TIW SEAL ASSEMBLY/PBR,STABBED INTO EXISTING 3.000 PBR _. Tubing Description String Ma...ID(in) Top(ftKB) Set Depth(ft..Set Depth(ND)(...Wt(lb/ft) Grade Top Connection TUBING-Original 31/2 2.992 8,590.9 8,654.6 5,914.4 9.30 J-55 EUE8rdABMOD Completion Details GAS LIFT;8,299.3 Nominal ID - Top(ftKB) Top(ND)(ftKB) Top Incl(°) Item Des Corn (in) 8,590.9 5,873.5 49.92 PBR TIW PBR w/10'STROKE 3.000 8,603.7 5,881.7 49.94 PACKER TIW HM-1 RETRIEVABLE PACKER 3.500 LOCATOR;8,355.38,621.0 5,892.9 49.98 NIPPLE CAMCO D NIPPLE NO GO 2.750 SEAL ASSY;0,356.3 -7 8,653.6 5,913.8 50.06 SOS TIW SHEAR OUT SUB 3.015 PBR;8,363.4 Perforations&Slots PACKER;8,385.84011 Shot Dens Top(ND) Btm(ND) (shotslr Top(ftKB) Btm(ftKB) (ftKB) (ftKB) Zone Date t) Type Com 8,735.0 8,782.0 5,966.0 5,996.0 C-4,1L-24 8/20/1991 6.0 IPERF 21/8"Flow Jet Stri;0 NIPPLE;8,438.5 deg.ph 8,920.0 8,949.0 6,083.8 6,102.2 A-5,1L-24 6/18/1991 4.0 IPERF 4.5"Carrier;180 deg.ph OVERSHOT;6,456.1 9,010.0 9,029.0 6,141.0' 6,153.0 A-4,1L-24 6/18/1991 4.0 IPERF 4.5"Carrier;180 deg.ph Mandrel Inserts SEAL ASSY;8,476.0 St ati PBR;8,477.3 on Top(ND) Valve Latch Port Size TRO Run PACKER;8,491.0N Top(ftKB) (MB) Make Model OD(in) Sero Type Type (In) (psi) Run Date Corn T/ 1 3,338.6 2,496.9 CAMCO MMG 1 1/2 GAS LIFT GLV RK 0.188 1,264.0 1/6/2014 - 2 4,994.3 3,549.7 CAMCO MMG 1 1/2 GAS LIFT GLV RK 0.188 1,253.0 1/6/2014 3 6,219.9' 4,344.4 CAMCO MMG 1 1/2 GAS LIFT GLV RK 0.188 1,241.0 1/6/2014 4 7,199.5 4,959.4 CAMCO MMG 1 1/2 GAS LIFT GLV RK 0.188 1,228.0 1/6/2014 NIPPLE;8,572.5 5 7,870.9 5,403.2 CAMCO MMG 11/2 GAS LIFT OV RK 0.250 0.0 1/7/2014 1 6 8,299.3 5,685.2 CAMCO MMG 1 1/2 GAS LIFT DMY RK 0.000 0.0 12/22/2013 11 SEAL ASSY;8,589.6 - Notes:General&Safety PBR;8,590.9 - End Date Annotation El 6/12/2004 NOTE:WORKOVER PACKER:8,603.7 '' 6/12/2004 NOTE:TREE CAP CONNECTION:3" A1.1 6/12/2004 NOTE:TREE:CAMERON/GEN 5/3-1/8"/5000 psi NIPPLE;8,6216 10/5/2010 NOTE:View Schematic w/Alaska Schematic9.0 1 SOS;8,653.6 - (PERF;8,735.0-8,782.0 (PERF;8,920.0-8,949.0.- (PERF;9.010.0-9,029.0-- PRODUCTION;28.3-9240.9 • S Sundry Application Plug for Re-drill Wells Work Flow This process is used to identify wells that are suspended for a very short time prior to being re- drilled. Those wells that are not re-drilled immediately are identified every 6 months and assigned a current status of"Suspended." Step Task Responsible 1 The initial reviewer will check to ensure that the "Plug for Redrill" box Geologist / 6 in the upper left corner of Form 10-403 is checked. If the "Abandon" or 1/ "Suspend" boxes are also checked, cross out that erroneous entry and initial it on both copies of the Form 10-403 (AOGCC's and operator's copies). 2 If the "Abandon" box is checked in Box 15 (Well Status after proposed Geologist work)the initial reviewer will cross out that erroneous entry and initial then it on both copies of the Form 10-403 (AOGCC s and operator's copies). Instead, check the "Suspended"box and initial that change. Drilling Engineer The drilling engineers will serve as quality control for steps 1 and 2. (QC) 3 When the Stat Tech receives a Form 10-403 with a check in the "Plug Stat Tech for Redrill" box, she will enter the Typ_Work code "IPBRD" into the History tab for the well in RBDMS. This code automatically generates a comment in the well history that states "Intent: Plug for Redrill." 4 When the Stat Tech receives any Form 10-407, she will check the Stat Tech History tab in RBDMS for the "Intent: Plug for Redrill" code (IPBRD). If present and there is no evidence that a subsequent re-drill has been COMPLETED, the Stat Tech will assign a status of SUSPENDED to the well bore in RBDMS no matter what status is listed on the 10-407. The Stat Tech will also change the status on the 10-407 form to SUSPENDED, and date and initial this change. If the Stat Tech does not see the "Intent: Plug for Redrill" comment or code, she will enter the status listed on the Form 10-407 into RBDMS. 5 When the Form 10-407 for the redrill is received, the Stat Tech will Stat Tech change the original well's status from SUSPENDED to ABANDONED. 6 The first week of every January and July, the Stat Tech and one of the Stat Tech Geologists will check the "Well by Type Work Outstanding" user query in RBDMS to ensure that all of the Plug for Redrill wells have been Geologist handled properly. At this same time, they will also review the list of suspended wells for accuracy. z 54S3°I WELL LOG TRANSMITTAL DATA LOGGED 614E/2015 M K.BENDER To: Alaska Oil and Gas Conservation Comm. May 18, 2015 Attn.: Makana Bender 333 West 7th Avenue, Suite 100 Anchorage, Alaska 99501 RECEIVED MAY 2 1 2015 RE: Multi Finger Caliper(MFC) : 1L-24 AOGCC Run Date: 5/9/2015 The technical data listed below is being submitted herewith. Please address any problems or concerns to the attention of: Chris Gullett, Halliburton Wireline &Perforating, 6900 Arctic Blvd., Anchorage, AK 99518 FRS_ANC@halliburton.com 1L-24 Digital Data(LAS), Digital Log file, Casing Inspection Report, 3D Viewer 1 CD Rom 50-029-22170-00 SCANNED JUN 1 2 2015 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING A COPY OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: Halliburton Wireline&Perforating Attn: Chris Gullett 6900 Arctic Blvd. Anchorage, Alaska 99518 Office: 907-273-3527 Fax: 907-273-3535 FRS_ANC@halliburton.com Date: Signed:MALidukikt_agligmat XHVZE Pages NOT Scanned in this Well History File This page identifies those items that were not scanned during the initial scanning project. They are available in the original file and viewable by direct inspection. o, PAGES TO DELETE Complete RESCAN Color items - Pages: Grayscale, halftones, pictures, graphs, charts- Pages: Poor Quality Original - Pages: [] Other- Pages: DIGITAL DATA n Diskettes, No. n Other, No/Type OVERSIZED Logs 'of vadous kinds . [] Other COMMENTS: Scanned by: Beverly D~than Lowell TO RE-SCAN Notes: Re-Scanned by: Bevedy Dianna Vincent Nathan Lowell Date: /si STATE OF ALASKA ALA 1 OIL AND GAS CONSERVATION COMIC_ MON REPORT OF SUNDRY WELL OPERATIONS E rtf4"kr ,,1.Operations Performed: Abandon r Repair well r RugPeerforations r Perforate r Other,✓�Alter Casing r Pull Tubing r Stimulate-Frac r Waiver r Time ExtensioA c ru Change Approved Program rOperat. Shutdown r Stimulate-Other r Re-enter Suspended Well r 2.Operator Name: 4.Well Class Before Work: 5.Permit to Drill Number: ConocoPhillips Alaska, Inc. Development rrr Exploratory r r 191-066 3.Address: 6.API Number: P. O. Box 100360,Anchorage,Alaska 99510 Stratigraphic r Service r • 50-029-22170-00 7.Property Designation(Lease Number): 8.Well Name and Number: ADL 25664 . v 1 L-24 9.Logs(List logs and submit electronic and printed data per 20AAC25.071): 10.Field/Pool(s):, none Kuparuk River Field/Kuparuk River Oil Pool 11.Present Well Condition Summary: Total Depth measured . 9241 feet Plugs(measured) none true vertical 6287 feet Junk(measured) none Effective Depth measured 9155 feet Packer(measured) 8386, 8491, 8604 true vertical 6232 feet (true vertical) 5741, 5809, 5882 Casing Length Size MD ND Burst Collapse CONDUCTOR 78 16 122 122 SURFACE 5038 9.625 5081 3610 PRODUCTION 9213 7 9241 6287 Perforation depth: Measured depth: 8735-8782, 8920-8949,9010-9029 SCONE° AA" 2 ' { 1 ° True Vertical Depth: 5966-5996,6084-6102, 6141-6153 Tubing(size,grade,MD,and ND) 3.5, L-80,8464 MD, 5792 TVD RBDMS° MAY 17 2014 Packers&SSSV(type,MD,and TVD) PACKER-BAKER FHL RETRIEVABLE PACKER @ 8386 MD and 5741 TVD PACKER-BAKER FHL PACKER @ 8491 MD and 5809 TVD PACKER-TIW HM-1 RETRIEVABLE PACKER @ 8604 MD and 5882 ND NO SSSV 12.Stimulation or cement squeeze summary: Intervals treated(measured): no stimulation or cement squeeze during this operation Treatment descriptions including volumes used and final pressure: 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation shut-in Subsequent to operation 14.Attachments 15.Well Class after work: Copies of Logs and Surveys run Exploratory r Development r • Service r Stratigraphic r 16.Well Status after work: Oil 17 Gas r WDSPL r Daily Report of Well Operations XXX I. GSTOR r WINJ r WAG r GINJ r SUSP r SPLUG r 17.I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O.Exempt: none Contact Jonathan Coberly Cad 265-1013 Email Jonathan.Coberly conocophillips.com Printed Name Jo ath n Coberly Title Workover Engineer Signature CY Phone:265-1013 Date ( -2/" Zo IN 74 ,s--,z6- I'8 Form 10-404 Revised 10/2012 y� Submit Original Only y t KUP PROD 1 L-24 ..t ✓ Dr6 ConocoPhjlhhps ' .w ,Well Attributes IMax Angle&MD TD Alaska.Inc. Wellbore API/UWI Field Name Wellbore Status ncl I") MD(ftKB) Act Btm(ftKB) 500292217000 KUPARUK RIVER UNIT PROD 53.31 4,700.00 9241.0 ••• Comment H2S(ppm) Date Annotation End Date KB-Grd(ft) 'Rig Release Date rL-24.1/17/20148:45'.33 AM SSSV:NONE 70 8/14/2012 Last WO: 12/17/2013 42.99 5/23/1991 Vaniwf schem lK(actual) Annotation Depth(ftKB) End Date Annotation Last Mod By End Date ___ _... _._. __.__._...Last Tag:SLM 8,869.0 1/9/2014 Rev Reason:WORKOVER,GLV C./0,PULL haggea 1/16/2014 t PLUG/CATCHER,TAG,Pull RHC Plug HANGER'39.2 +y'I1};, 'Casing Sbfngs. �I� Casing Description OD(in) ID(in) Top(ftKB) Set Depth(ftKB) Set Depth(ND)... Wt/Len(I...Grade Top Thread CONDUCTOR 16 15.062 44.0 122.0 122.0 62.50 H-40 WELDED Casing Description OD(in) ID(in) Top(ftKB) Set Depth(ftKB) Set Depth(TVD)... Wt/Len(I...Grade Top Thread 1l SURFACE 95/8 8.921 43.0 5,081.2 3,610.2 36.00 J-55 BTC Casing Description OD(in) ID(in) Top(ftKB) Set Depth(ftKB) Set Depth(TVD)... Wt/Len(I...Grade Top Thread PRODUCTION 7 6276 28.3 9,240.9 6,286.8 26.00 J-55 BTC-MOD Tubing Strings Tubing Description String Ma...ID(in) Top(ftKB) Set Depth(ft..Set Depth(TVD)(...Wt(Ib/ft) Grade Top Connection TUBING WO-2013 312 2.992 392 8,464.4 5,791.9 9.30 L-80 EUE-m .A-n1 CONDUCTOR,44.0-122.0III Completion Details Nominal ID Top(ftKB) Top(TVD)(ftKB) Top Incl(°) Item Des Com (in) GAS LIFT;3.338.6 39.2 39.2 0.08 HANGER FMC Gen IV TUBING HANGER 2.992 III 8,355.3 5,721.4 49.72 LOCATOR BAKER LOCATOR SUB 2.990 8,356.3 5,722.0 49.72 SEAL ASSY BAKER SEAL ASSY-Space out above PBR locator sub 2.990 "Actual space out" 7.08'locator above PBR 8,363.4 5,726.6 49.72 PBR BAKER 80-40 POLISH BORE RECEPTACLE 40,000 4.000 GAS LIFT,4.994.3 - : Shear force 111 8,385.8 5,741.1 49.72 PACKER BAKER FHL RETRIEVABLE PACKER 60,000 PSI Shear 2.930 Release 8,438.5 5,775.2 49.75 NIPPLE CAMCO"DS"NIPPLE 2.875" 2.875 SURFACE,430-5,0812-u . 8,456.1 5,786.6 49.76 OVERSHOT BAKER POORBOY OVERSHOT 6"OD x 3.62"ID 3.000 Swallowed 6.84'of tbg stub. III Tubing Description String Ma...ID(in) Top(ftKB) Set Depth(k...Set Depth(TVD)(...Wt(INR) Grade Top Connection GAS LIFT;6.219.9 TUBING WO-2004 3 1/2 2.992 8,457.61 8,602.3 5,880.9 9.30 J-55 EUE AB MOD Completion Details :� Nominal ID Top(ftKB) Top(ND)(ftKB) Top Incl(°) Item Des Com (in) • I 8,476.0 5,799.4 49.78 SEAL ASSY BAKER 80-40 SEAL ASSEMBLY 2.980 GAS LIFT,7,199.4 III. 8,477.3 5,800.2 49.78 PBR BAKER 80-40 PBR 2.980 , 8491.0 5,809.1 49.79 PACKER BAKER FHL PACKER 2.930 a8,572.5 5,861.6 49.89 NIPPLE CAMCO DS NIPPLE WITH 2.72"NO-GO 2.812 GAS LIFT,>.e7os 8,589.6 5,872.6 49.92 SEAL ASSY TIW SEAL ASSEMBLY/PBR,STABBED INTO EXISTING 3.000 PBR B Tubing Description String Ma...ID(in) Top(ftKB) Set Depth(ft..Set Depth(ND)(...Wt(Ib/ft) Grade Top Connection . TUBING-Original 312 2.992 8,590.91 8,654.6 5,914.4 9.30 J-55 EUEBrdABMOD III Completion Details GAS LIFT;8.299.3111 Nominal ID B Top(ftKB) Top(ND)(ftKB) Top Incl(°) Item Des Com (in) 8,590.9 5,873.5 49.92 PBR TIW PBR w/10'STROKE 3.000 8,603.7 5,881.7 49.94 PACKER TIW HM-1 RETRIEVABLE PACKER 3.500 LOCATOR,8.355.3 8,621.0 5,892.9 49.98 NIPPLE CAMCO D NIPPLE NO GO 2.750 SEAL ASSY,8,356.3 8,653.6 5,913.8 50.06 SOS TIW SHEAR OUT SUB 3.015 PER,8.363.4 r Perforations&Slots PACKER;8.3858 4.4.:-.i, . Shot.... It Dens Top(TVD) 13.(ND) (shots/f Top(ftKB) Btm(ftKB) (ftKB) (ftKB) Zone Date t) Type Com ,0 8,735.0 8,782.0 5,966.0 5,996.0 C-4,1L-24 8/20/1991 6.0 IPERF 2 1/8"Flow Jet Stri;0 deg.ph NIPPLE.8.438.5 a 8,920.0 8,949.0 6,083.8 6,102.2 A-5,1L-24 6/18/1991 4.0 IPERF 4.5"Carrier;180 deg.ph OVERSHOT;8,456.1 I'I'.I 9,010.0 9,029.0 6,141.0 6,153.0 A-4,1L-24 6/18/1991 4.0 IPERF 4.5"Carrier;180 deg.ph S I Mandrel Inserts SEAL ASSY,8.476.0 St ati C PBR;8,477.3 on Top(ND) Valve Latch Port Size TRO Run PACKER,8591 0 _ No Top(ftKB) (ftKB) Make Model OD(in) Sery Type Type (in) (psi) Run Date in 1 3,338.6 2,496.9 CAMCO MMG 1 1/2 GAS LIFT GLV RK 0.188 1,264.0 1/6/2014 I 2 4,994.3 3,549.7 CAMCO MMG 1 1/2 GAS LIFT GLV RK 0.188 1,253.0 1/6/2014 3 6,219.9 4,344.4 CAMCO MMG 1 1/2 GAS LIFT GLV RK 0.188 1,241.0 1/6/2014 4 7,199.5 4,959.4 CAMCO MMG 1 1/2 GAS LIFT DMY RK 0.188 1,228.0 1/6/2014 NIPPLE,65725 5 7,870.9 5,403.2 CAMCO MMG 1 1/2 GAS LIFT OV RK 0.250 0.0 1/7/2014 a 6 8,299.3 5,6852 CAMCO MMG 1 1/2 GAS LIFT DMY RK 0.000 0.0 12/22/2013 • Notes:General&Safety SEAL ASSY,8589.61 •=. End Date Annotation PER.B.590.9 6/12/2004 NOTE:WORKOVER I• 6/12/2004 NOTE:TREE CAP CONNECTION:3" PACKER,8,603.7 ''"" 6/12/2004 NOTE:TREE:CAMERON/GEN 5/3-1/8"/5000 psi NIPPLE;8,621.0 - 10/5/2010 NOTE:View Schematic w/Alaska Schematic9.0 I 505 8,653.6 1 ii IPERF.8735.0-8,782.0 (PERF;8.9200-8.949.0- 1 PERF;9,010.0-9,029.0 PRODUCTION;28.3-9,240.9 f 1L-24 PRE AND POST RIG WELL WORK DATE SUMMARY PRE-RIG WELL WORK 10/22/2013 Set Catcher Assembly @ 8531'SLM; Replaced Ext Pkg DV @ 7880' RKB w/DV; Replaced OV @ 6932' RKB w/DV. In Progress. 10/24/2013 Replaced GLV's @ 5509' &3471' RKB w/DV's; Pulled Empty Catcher @ 8531' SLM. Ready for BPV. POST RIG WELL WORK 1/4/2014 PULL BALL N' ROD @ 8430' RKB, PULL SOV @ 7874' RKB, PULL DV'S @ 7199, 6220 &4994' RKB, IN PROGRESS. 1/6/2014 PULL DV @ 3339' RKB, SET GLV'S @ 3339, 4994, 6220' RKB, JOB IN PROGRESS 1/7/2014 SET GLV @ 7199' RKB &OV @ 7871' RKB; PULL RHC PLUG @ 8439' RKB; DRIFT W/BAILER AND ENCOUNTER FILL @ 8505'SLM (CSA-2 PLUG @ 8572' RKB). JOB IN PROGRESS 1/8/2014 PULL CATCHER FROM TOP OF PLUG @ 8572' RKB; ATTEMPT TO LATCH PRONG FROM PLUG @ SAME. IN PROGRESS. 1/9/2014 PULL CSA-2 PLUG @ 8572' RKB; TAG FILL @ 8869' SLM (EST 135'OF FILL)&MEASURE BHP (3093 psi)@ 8780' RKB. JOB COMPLETE. ConocoPhillips Time Log & Summary WeIMew Web Reporting Report Well Name: 1L-24 Rig Name: NABORS 7ES Job Type: RECOMPLETION Rig Accept: 12/17/2013 10:00:00 PM Rig Release: 12/23/2013 12:00:00 PM Time Logs Date From To Dur S. Depth E. Depth Phase Code Subcode T Comment 12/17/2013 24 hr summary MIRU on well 1 L-24, Spot rig, berm all areas, RU tiger tanks and hardlines, PU lubricator and RU to kill well with 8.6 ppg seawater. Rig accepted at 22:00 12/17/2013 00:00 05:00 5.00 MIRU MOVE MOB P Blow down all lines and RD, remove all berming,remove cuttings tank, pull pits away from rig. Clean up herculite and rig site. 05:00 09:30 4.50 MIRU MOVE MOB P Pull sub off well remove old tree and equipment from around wellhead. Hang new tree in cellar. Set mats around 1 L-24 and spread herculite Attempt to spot sub,well house 23 too close. 09:30 12:00 2.50 MIRU MOVE MOB P Call out to remove well house handrails and ladder. Crew change. 12:00 13:00 1.00 MIRU MOVE MOB P Remove well house handrails and ladder. REmove excess gravel from cellar area to access OA valves and wellhead. 13:00 15:30 2.50 MIRU MOVE MOB P Set sub over well,set tubing head in cellar. 15:30 19:00 3.50 MIRU MOVE MOB P Position pit module, set mats, herculite and cuttings tank with stairs. Set pits, position to rig and set down. Place parts house and mud shack. 19:00 22:00 3.00 MIRU MOVE MOB P RU interconnect mud lines and electrical. Berm up rig, pits, cuttings tank and fuel tank. Rig accepted at 22:00 22:00 23:30 1.50 MIRU WHDBO RURD P PU lubricator to floor and prep same. 23:30 00:00 0.50 MIRU WHDBO RURD P Pull BPV per FMC rep with lubricator. 12/18/2013 RU circ lines in cellar, PT lubricator to 1000 psi for 5 minutes; Good. Pull BPV and LD lubricator. RU hardlines to well head and squeeze manifold. Incident; hand injury. Safety Standdown: Discuss incident and re-focus crews to task. IP to medic. Finish RU and PT all lines;good. Displace well with 8.6 Seawater at 5 BPM with IP-870 psi FP=1140 psi. RD circulating lines and blow down. Monitor well; Static. Perform Safety standdown with all crew on location for heightened awareness with AM crew. Perform Safety standdown with all crew on location with PM crew. Install BPV, ND tree, inspect hanger threads, install Blanking plug. NU BOPs, RU to test and PU test tools. Perform Koomey test;good. Safety Standdown at KCS with C.Alvord for field incident review. PU test tools and MU test joint. Page 1of9 Time Logs Date From To Dur S. Depth E. Depth Phase Code Subcode T Comment 00:00 01:00 1.00 MIRU WHDBO PRTS P PT lubricator to 1000 psi for 5 minutes;good. Pull BPV, lubricator showing 20 psi on gauge. RU lubricator. 01:00 03:30 2.50 MIRU WHDBO RURD P RU hardlines to rig, RU squeeze manifold and circ lines to tree. 03:30 04:00 0.50 MIRU WHDBO SFTY P Safety Standdown; Gathered all crew and discussed heightened awareness of pinch points; hand and body placement.Addressed change of scope of tasks and mitigation measures for all tasks; STOP and discuss changes, Reassess plans. Discussed using mechanical advantage to move and hold heavy objects. If a pry bar is being used, there should be no hands on the item being moved. 04:00 06:00 2.00 MIRU WHDBO RURD P Continue to RU hardlines to rig, Circ manifold and circ lines to tree. 06:00 07:30 1.50 MIRU WHDBO PRTS P PT all lines with air;correct leak in hardline. Re-test with air;good. Initial pressure on IA= 10 psi, Tbg= 20 psi,OA=360 psi. Fill lines and PT same with seawater and test to 3500 psi;good. 07:30 10:30 3.00 MIRU WELCTL CIRC P Circulate 8.6 seawater taking returns from the tubing until seawater to Tiger tank. Circulate down tubing taking returns from the IA until clean 8.6 seawater at TT. Circ at 5 BPM with 870 psi IP and 1140 psi FP. 406 BBLs pump for displacement. 10:30 11:00 0.50 MIRU WELCTL OWFF P Observe well for flow; Static. RD circ lines and blow down all lines. 11:00 11:45 0.75 MIRU WELCTL SFTY P Well SI with no flow for Standdown on the rig with AM crew and Supervisors. 11:45 12:00 0.25 MIRU WELCTL OWFF P Open well and observe no pressure build during SI. Observe well; Static. Crew change. 12:00 13:00 1.00 MIRU WELCTL SFTY P Safety Standdown on the rig with PM crew and Supervisors. Incicent discussion and IFC discussions. 13:00 14:00 1.00 MIRU WELCTL RURD P Well Static, RD all circ lines and empty TT. 14:00 16:30 2.50 MIRU WHDBO OWFF P FMC rep install BPV and ND tree. Inspect hanger threads;good. Install blanking plug with 10 1/2 RH turns, running XO ACME= 10 LH turns. 16:30 19:30 3.00 MIRU WHDBO NUND P NU 13-5/8" BOPE. 19:30 21:00 1.50 MIRU WHDBO RURD P PU test tools and RU to test BOP. 21:00 21:30 0.50 MIRU WHDBO PRTS P Perform Koomey test; IP=2975 psi, 200 psi recovery= 15 sec with full recovery=94 sec. Electric rec=24 sec,Air rec=60 sec. Page 2of9 Time Logs Date From To Dur S. Depth E. Depth'Phase Code Subcode T Comment 21:30 23:30 2.00 MIRU WHDBO SFTY P Safety Standdown with C.Alvord at KCS pad for discussion of the incidents around the field to heighten awareness to the increasing trend of incidents. 23:30 00:00 0.50 MIRU WHDBO RURD P PU test joint, TIW,XO, LH ACME x 3 1/2 IF XO; MU blanking plug Crew change. 12/19/2013 Test BOPE;Witness waived by Jeff Turkington AOGCC rep.; Good tests 250/3500 psi with 3 1/2"test joint. RU GBR and change rig equipment to handle tubing. PUll blanking plug and BPV with no pressure under it. MU landing joint and engage hanger, attempt to pull seals without success up to 145K indicated weight. Call out HES E-line, RU and cut tubing at 8456'WLM. Tubing reaction on rigfloor and confirmation pass with CCL showed 5'upward movement on tubing. Free PU=85K, SO=67K. RD and release HES E-line. 00:00 01:30 1.50 MIRU WHDBO RURD P Rig up to test BOPE. Steam top drive. Organize cellar and measure space out for rams and test joint. 01:30 07:00 5.50 MIRU WHDBO BOPE P Test 13-5/8 5m BOPE w/3.5"OD test jt.Witness of test waived by AOGCC rep Jeff Turkington. Test to 250 psi low and 3500 psi high, held all tests for 5 min.All tests charted. 07:00 08:00 1.00 MIRU WHDBO RURD P Lay down testing equipment. Blow down lines. Remove FMC blanking plug. 08:00 08:15 0.25 MIRU WHDBO OWFF P Observe no pressure on well below back pressure valve. 08:15 08:30 0.25 MIRU WHDBO OTHR P Remove FMC 3"ISA back pressure valve. 08:30 11:00 2.50 COMPZ RPCOM RURD P Pick up third party tools to the floor. Rig up to pull 3.5"9.3 ppf L-80 and J-55 EUE 8rd tubing completion. Rig up GBR tools. Change bales to long bales to rig up crossovers and TIW valve for reverse circulation. 11:00 12:00 1.00 COMPZ RPCOM RURD P Make up 3.5"EUE-m 9.3 ppf L-80 pups for landing joint. Screw into the FMC 3-1/2"EUE hanger. Crew change. 12:00 13:30 1.50 COMPZ RPCOM RURD P Continue to MU 3.5"landing joint. Screw into the FMC 3-1/2"EUE hanger. 13:30 13:45 0.25 COMPZ RPCOM OTHR P Pull on 3-1/2"9.3 ppf Tubing string. 4'of movement at surface w/140K on weight indicator. 13:45 15:15 1.50 COMPZ RPCOM CIRC P Pulling and work pipe to 140K while pumping 4.2 BPM with 530 psi,final circ rate 5.5 BPM with 830 psi at 145K on weight indicator.Total movement=5'from landed. Circulated surface to surface plus. 15:15 16:15 1.00 COMPZ RPCOM RURD P Set pipe in slips w/120-125K on weight indicator. Estimated PU wt of 90-95K with Nabors 7es. Change bales and elevators, 16:15 17:30 1.25 COMPZ RPCOM RURD P HES E-line spot unit and prep tools for cutting tubing. RU wireline and prep tools for cutting tubing. Page 3 of 9 .... ........... Time Logs Date From To Dur S. Death E. Depth Phase Code Subcode T Comment 17:30 20:30 3.00 0 COMPZ RPCOM ELNE P Position HES rig and RU E-line, sheaves, circ tee,circ line,weight bars, rollers, Electric jars, knuckle joints, centralizer, CCL, EMA, and RCT 20:30 22:00 1.50 0 8,455 COMPZ RPEQP1 ELNE P RIH with E-line string; CCL, EMA, and RCT. Make correlation pass and get on depth with packer at 8490' WLM. Correlate on up pass,then reset on up pass to cut depth. Set anchor and fire at 8449.9'+9.6'= 8455.5'WLM. 9.6' RCT offset to CCL. Good indication of cut success on the rigfloor. Confirmation pass with CCL showed 5'upward movement on tubing. 22:00 23:30 1.50 8,455 0 COMPZ RPEQP1 ELNE P POOH with E-line to surface. 23:30 00:00 0.50 0 COMPZ RPEQP1 ELNE P RD E-line to the side. 12/20/2013 Pull 3 1/2"completion. With 15K+weight; 163 joints LD. MU storm packer and set 78'below the rigfloor and Test; good. Monitor well;Static. ND BOP and rack back on pedestal. ND Tubing head and remove packoff as per FMC. 7"casing 3/4"growth,did not use Hydratight equipment. RU and spear casing. Pull 200K indicated hookload for 23 1/4"stretch. FMC set new E-slips, install packoff and tubing head,test 250/3000 for 10 minutes; Good. 00:00 00:30 0.50 COMPZ RPEQP1 ELNE P Disassemble E-line string and RD to standby. 00:30 01:00 0.50 COMPZ RPCOM SVRG P Service rig and topdrive. 01:00 02:15 1.25 8,454 8,428 COMPZ RPCOM CIRC P Pull hanger to the floor and close top pipe rams rams. Reverse circulate at tubing cut surface to surface at 7 BPM with 1420 psi. Release HES E-line. 02:15 02:30 0.25 8,428 8,428 COMPZ RPCOM OWFF P Observe well for flow for 15 minutes; Static. 02:30 03:00 0.50 8,428 8,428 COMPZ RPCOM RURD P RU GBR tubing handling equipment. 03:00 06:00 3.00 8,428 7,147 COMPZ RPCOM PULL P LD landing joint pups on the rig floor and LD 15jts 3 1/2"9.3#EUE L-80 tubing(464.8'),42 jts 3 1/2" EUE J-55 tubing(808.57'), space out 6.08', DS nipple 1.60'. PU=74K, SO=65K. 06:00 10:15 4.25 7,147 3,834 COMPZ RPCOM PULL P Continue to POOH laying down 3-1/2"9.3 ppf J-55 tubing: Layed down an additional 106 jts of tubing( 3293.36'),(1)Camco GLM w/pups (18.90'). PU=52k, S0=46k. 10:15 11:00 0.75 3,834 3,834 COMPZ RPCOM RURD P Pull stripping rubber, monitor well- static. Rig down GBR equipment. 11:00 11:15 0.25 3,834 3,834 COMPZ WHDBO RURD P Change elevators f/3.5"slip type to 3.5"bottle neck to handle drill pipe. Page 4 of 9 Time Logs Date From To Dur S. Depth E. Depth Phase Code Subcode T Comment 11:15 12:00 0.75 3,834 3,918 COMPZ WHDBO PULD P Make up crossover (3-1/2"IF box x 3-1/2" EUE pin), Baker Model"L" Retrievamatic, crossover(HT38 box x 3-1/2" IF pin). PU/MU 3-1/2"S-135 HT38 drill pipe, RIH to set center of element @ 78.01'. PU=t 52k, S0= 46k. 12:00 12:30 0.50 3,918 3,918 COMPZ WHDBO TRIP P Apply 1/4 turn left hand,set packer. Back of twin thread w/15 right hand turns, POOH w/2 jts of 3-1/2"dp and top half of the twin thread. 12:30 12:45 0.25 3,918 3,918 COMPZ WHDBO RURD P Rig up to test Baker 7"Model"L" retrievamatic to 1000 psi f/10 min. 12:45 13:00 0.25 3,918 3,918 COMPZ WHDBO PRTS P Pressure test storm packer to 1000 psi f/10 minutes. Chart test. 13:00 13:30 0.50 3,918 3,918 COMPZ WHDBO OWFF P Monitor IA and OA for 30 minutes to atmoshere. Static, no returns. 13:30 15:30 2.00 3,918 3,918 COMPZ WHDBO NUND P Nipple down 13-5/8"BOPE. Set on stump. Nipple down DSA. FMC rep pull packing. 15:30 17:00 1.50 3,918 3,918 COMPZ WHDBO NUND P Nipple down FMC tubing head. 7" casing appeared to have grown only 3/4"from the preferred cut length of 6 1/4". Decision to re-tension to 200k 1 on wt indicator= 150k on 7"string. 17:00 18:00 1.00 3,918 3,918 COMPZ WHDBO CUTP P PU and MU spear as per Baker rep. Engage spear and pull 200K hookload indicated weight. Measured 23 1/4"stretch of the 7" casing. Note: Of the 200k weight indicator reading:20k hanging on a storm packer-will be removed,30k was block weight. So 150k was the actual weight of the 7"casing on the FMC slips. 18:00 20:00 2.00 3,918 3,918 COMPZ WHDBO CUTP P FMC rep pull slips and install new E slips. Slack down and set E-slips with 1/4"downward movement with slackoff. Release spear and LD as per Baker rep. 20:00 21:00 1.00 3,918 3,918 COMPZ WHDBO CPBO P FMC reps cut and bevel 7"casing with Wachs cutter and NU tubing head. Cut is 6-1/4"above the 7" casing flange. Note:Where the slips had been on the joint,was all removed with the cut. 21:00 23:00 2.00 3,918 3,918 COMPZ WHDBO NUND P Install packoff and tubing head as per FMC rep. 23:00 00:00 1.00 3,918 3,918 COMPZ WHDBO PRTS P Test tubing head void as per FMC, 250/3000 psi for 10 minutes each. Page5of9 1 Time Logs Date From To Dur S.Depth E. Depth Phase Code Subcode T Comment 12/21/2013 24hrSummary NU BOP stack and test Inner IA against the storm packer; 250/3000 psi;good.Test breaks above tubing head; Good. Retrieve storm packer and LD. RU GBR and tubing handling equipment. Service rig and topdrive. Trouble-shoot skate non-op and repair. Pull remaining tubing and LD with GLM. LD 18.63'cut joint. Monitor well; Static. Load,strap and drift tubing in the shed. Charge OA with 180 psi for pressure reference. Stage tbg running order and check. Run 3 1/2"completion as per running order; 3 1/2"9.3#L-80 EUE 8rd tubing,4 GLM, PBR, FHL packer, DS nipple and Poorboy Overshot. 00:00 00:30 0.50 3,918 3,918 COMPZ WHDBO PRTS P Continue to test tubing head void as per FMC,250/3000 psi for 10 minutes each;good. 00:30 03:00 2.50 3,918 3,918 COMPZ WHDBO NUND P Set 13-5/8"5m BOP stack on wellhead and torque all bolts to spec and secure stack on well. 03:00 03:30 0.50 3,918 3,918 COMPZ WHDBO RURD P PU test tools,fill stack and RU to test. 03:30 04:30 1.00 3,918 3,918 COMPZ WHDBO PRTS P Test Inner IA valve against storm packer;250/3000 psi;Good. Set test plug and test stack at flange after break above tubing head; 250/3500 psi on chart. 04:30 05:00 0.50 3,918 3,918 COMPZ WHDBO RURD P LD test tools and blow down all lines. 05:00 06:00 1.00 3,918 3,840 COMPZ RPCOM PULL P MU Storm packer retrieving tool. TIH with closed TIW installed and engage storm packer @ 78'. Perform 22 RH turns,open TIW slowly to mitigate any pressure release; None. Pull free with PU=52K. LD Retrieval tool and Storm packer. 06:00 06:30 0.50 3,840 3,840 COMPZ RPCOM RURD P PU and MU tools, RU GBR, prep pipeshed to LD tubiong and strap. 06:30 07:00 0.50 3,840 3,840 COMPZ RPCOM SVRG P Service rig and topdrive. 07:00 09:30 2.50 3,840 3,840 COMPZ RPCOM EQRP T Pipe skate controls not operating; Trouble-shoot and repair. 09:30 12:00 2.50 3,840 1,026 COMPZ RPCOM PULL P Pull tubing and LD; 89 joints 3 1/2" L-80 9.3#EUE 8rd and 3 GLMs. Crew change. 12:00 13:30 1.50 1,026 0 COMPZ RPCOM PULL P Pull tubing and LD; 15 joints 3 1/2" L-80 9.3#EUE 8rd, 1 GLMs and cut joint; 18.63'. Tally of pipe laid down with Nabors RKB=8447.37',which equals 8459.82' Pool 7 RKB. 13:30 15:00 1.50 0 0 COMPZ RPCOM RURD P Monitor well; Static. RD GBR double stack tongs and RU running equipment. Inspect laid out tubing and take pictures for assessment. Stage completion equipment to rigfloor. LD Storm packer and running tool. 15:00 18:30 3.50 0 0 COMPZ RPCOM PULD P Drift and strap tubing in shed. Strap and stage completion in shed. Used test pump and diesel to increase OA pressure to 180 psi to have an active pressure range to observe. Page 6 of 9 Time Logs Date From To Dur S. Depth E. Depth Phase Code Subcode T Comment 18:30 00:00 5.50 0 2,530 COMPZ RPCOM RCST P Run 3 1/2"completion as per running order; 3 1/2"9.3#L-80 EUE 8rd tubing,4 GLM, PBR, FHL packer, DS nipple and Poorboy Overshot. RIH with 72 joints. PU= 46K, SO=43K. Crew change. 12/22/2013 Continue to run 3 1/2'completion as per running order. Observed a shear of the pins on the poorboy overshot w/14'in on jt @ 268,fully swallow tubing stub w/19.75'. Stub top @ 8457.60'(Pool 7 RKB), 8452.99' (Nabors 7es RKB). Pumped 195 bbls of corrosion inhibited seawater,chased w/6 bbls of seawater. Drop ball and rod,set packer. PT the IA to 1000 psi with the tubing open to the atmosphere; Good test. Bleed off IA.Apply 2000 psi to tubing, Pick up and observe shear of PBR w/100k on weight indicator. Pick up 30'. Slack off to locate,then figure space-out. Confirm seal locate with pumps.This is a 7.08'space out of the Seal assembly. RILDS. PT tubing with 3000 psi; Good test. With 1500 psi on tubing, PT IA to 2500 psi for 30 minutes; Good test. SOV in GLM @ 7871'. Sheared w/ 1900 psi on annulus. Confirmed open with flow both directions. Monitor well: Static 30 minutes. FMC rep install 3"ISA BPV and PT to 1000 psi for 10 minutes; Good test. NU adapter and Cameron 3-1/8"5m tree. Orientation verified by DSO. Install test plug and test tree; Good test. 00:00 05:00 5.00 2,530 7,375 COMPZ RPCOM RCST P Run completion string from 2530'to 7375'. 05:00 06:30 1.50 7,375 8,443 COMPZ RPCOM RCST P Continue to run completion as per running order. Observed a shear of the pins on the Poorboy Overshot w/ 14'in on jt @ 268 in the hole w/10k applied. Continued to slowly fully swallow tubing stub w/19.75'in on same jt w/5k down wt, confirming overshot completely swallowing the tubing stub. PU wt 90k, SO wt 65k. Pick up 10'to be 2'above the top of the cut jt stub. Note: Stub top @ 8457.60'(Pool 7 RKB),8445.15'(Nabors 7es RKB). 06:30 06:45 0.25 8,443 8,443 COMPZ RPCOM SFTY P Pre job safety meeting on rig up and pumping corrosion inhibited seawater. 06:45 07:00 0.25 8,443 8,443 COMPZ RPCOM RURD P Rig up to pump corrosion inhibited seawater. 07:00 09:00 2.00 8,443 8,443 COMPZ RPCOM CIRC P With annular closed. Pump down the kill line taking returns f/the tubing. Pumped 3 bpm w/350 psi. Pumped 195 bbls of corrosion inhibited seawater, chased w/6 bbls of seawater to clear lines. PU wt 90k, SO wt 65k. 09:00 09:30 0.50 8,443 8,452 COMPZ RPCOM PACK P Slack off and engage tubing stub again fully, PU 1'to 8451.99'. Drop ball and rod(8.99'long) for pressure setting Baker"FHL"packer. Saw packer set w/1775 psi, continues to pressure up to 2500 psi. Hold for 3 minutes,then bleed off pressure. Page 7 of 9 Time Logs Date From To` Dur S. Depth E.Depth Phase Code Subcode T Comment 09:30 10:30 1.00 8,452 8,465 COMPZ RPCOM DHEQ P Pressure test the IA to 1000 psi w/ the tubing open to the atmosphere for 10 minutes. Good test. Bleed off IA.Apply 2000 psi to tubing, Pick up and observe shear of PBR w/100k on weight indicator. Pick up 30'. Slack off and fully locate seals on PBR w/1k down wt. Mark pipe for space-out. 10:30 11:30 1.00 8,465 8,363 COMPZ RPCOM HOSO P Lay down 3 jts(268,267, and 266). Make up three space out pups, installing 2.40',then 4.11, and 6.28' on top. PU/MU jt 266, MU FMC 3-1/2EUE hanger w/pup,then 3-1/2" EUE landing jt. Idle mud pump @ 3/4 bpm w/60 psi to locate seals entering PBR. Shut down pumps, open bleeder line. 11:30 12:00 0.50 8,363 8,378 COMPZ RPCOM HOSO P Drain stack and continue to slack off to land FMC hanger in the tubing head. Bottom of seal assembly @ 8378.02'.This is a 7.08'space out of the Seal assembly. PU wt 85k, SO wt 665k, blocks 30k. Run in lock down screws. 12:00 12:30 0.50 8,378 8,378 COMPZ RPCOM DHEQ P With annulus open to atmosphere, pressure test tubing to 3000 psi f/15 minutes.Tested to 3020 with 15 psi loss to 3005 in 15 minutes. Good test. Bleed off pressure. 12:30 13:30 1.00 8,378 0 COMPZ RPCOM RURD P Remove landing joint. Blow down the top drive. 13:30 15:15 1.75 0 0 COMPZ RPCOM DHEQ P Re-pressure tubing to 1500 psi with blind rams closed. Pressure test IA to 2500 psi for 30 minutes. Pressured to 2590 psi,final was 2540 psi after 30 minutes. Lost 50 psi. Good test. Had a little trouble getting sensor to chart recorder working properly. Purged line. 15:15 15:30 0.25 0 0 COMPZ RPCOM PRTS P Bleed IA to zero,then bled down tubing to zero.Pressure up IA to shear SOV in GLM @ 7871'. Sheared w/1900 psi on annulus. Pumped 2 BBLs after shear to confirm. Pumping 2.9 BPM w/320 psi.Then pumped 2 BBL's down the tubing @ 2.8 bmp 400 psi. w/400 psi. 15:30 16:30 1.00 0 0 COMPZ RPCOM OWFF P Monitor well f/30 minutes-static. Drain stack. Blow down lines. 16:30 17:30 1.00 0 0 COMPZ WHDBO RURD P FMC rep install 3"ISA BPV. 17:30 17:45 0.25 0 0 COMPZ WHDBO PRTS P Pressure test BPV from below. Pumping through IA to 1000 psi, held f/10 minutes-good test. Page 8 of 9 ( r Time Logs Date From To Dur S. Depth E. Depth Phase Code Subcode T Comment 17:45 18:00 0.25 0 0 COMPZ WHDBO RURD P Blow down and rig down lines. 18:00 19:00 1.00 0 0 COMPZ WHDBO NUND P Nipple down BOP stack and adapter. 19:00 22:00 3.00 0 0 COMPZ WHDBO NUND P Nipple up adapter and Cameron 3-1/8"5m tree per FMC rep. Orientation of tree verified by DSO. FMC rep test adapter 250/5000 psi for 10 minutes each; Good test. 22:00 00:00 2.00 0 COMPZ WHDBO PRTS P FMC rep test tree 250/5000 psi for 10 minutes each; Good test. 12/23/2013 Pull test plug and RU to freeze protect with LRS. Pump 92 BBL diesel down IA, out tubing to cuttings tank. Allow well to equalize. Set BPV per FMC rep. Final pressures;Tbg=0 psi, IA=0, OA=20 psi. RDMO well. Finish pit cleaning, Blow down lines, Switch frorm highline power to generators, Disconnect interconnect and split power between modules. Release from well 1L-24;12:00 12/23/2013 00:00 01:00 1.00 COMPZ WHDBO RURD P LD test tool and RD tree testing equipment, pull tree test plug. 01:00 02:00 1.00 COMPZ WHDBO FRZP P RU LRS and rig lines to freeze protect well, PT lines to 2000 psi; Good. 02:00 03:00 1.00 COMPZ WHDBO FRZP P LRS pump 92 BBL diesel down IA and take returns to cuttings tank. At 2 BPM; ICP=700 psi, FCP=900 psi. 03:00 04:45 1.75 COMPZ WHDBO OWFF P RU communication IA x Tbg to allow U tube of diesel to equalize well. 04:45 05:00 0.25 COMPZ WHDBO RURD P Install BPV per FMC rep. Final pressures;Tbg=0 psi, IA=0, OA= 20 psi. 05:00 06:00 1.00 DEMOB MOVE MOB P Secure well head and RDMO well. / 06:00 11:00 5.00 DEMOB MOVE MOB P Prep Sub for move. Finish pit cleaning, blow down all lines, disconnect interconnect,take rig off highline power. Split power between modules and prep pits for move. 11:00 12:00 1.00 DEMOB MOVE MOB P Jack up pits and remove cuttings tank. Pull matting boards and herculite. Pull pits away from sub and stage for Sub movement. Release Rig 12:00 12/23/2013 Page 9 of 9 I ConocoPhillips ~~~ P.0. BOX 100360 ANCHORAGE, ALASKA 99510-0360 August 3, 2010 Commissioner Dan Seamount Alaska Oil & Gas Commission 333 West 7th Avenue, Suite 100 Anchorage, AK 99501 Commissioner Dan Seamount: ,~,. o~~ 1~ ~;~€ti r, (~~f ~_ ~ . ~~1~ ~ ~s G~'~° Ct~ission ~t~SK~+ ~+~+ ~ ~.~ti~~=3~ ~~ Enclosed please find a spreadsheet with a list of wells from the Kuparuk field (KRU). Each of these wells was found to have a void in the conductor. These voids were filled with corrosion inhibitor, engineered to prevent water from entering the annular space. As per previous agreement with the AOGCC, this letter and spreadsheet serves as notification that the treatments took place and meets the requirements of form 10-404, Report of Sundry Operations. The corrosion inhibitor/sealant was pumped August 1St & 2°d 2010. The attached spreadsheet presents the well name, top of cement depth prior to filling, and volumes used on each conductor. Please call Perry Klein or MJ Loveland at 907-659-7043, if you have any questions. ConocoPhillips Well Integrity Projects Supervisor ConocoPhillips Alaska Inc. Surface Casing by Conductor Annulus Cement, Corrosion inhibitor, Sealant Top-off ® ~ Report of Sundry Operations (10-404) Kuparuk Field Date 8/03/10 1 A_ 1 D_ 1 L PAD Well Name API # PTD # Initial top o cement Vol. of cement um ed Final top of cement Cement top off date Corrosion inhibitor Corrosion inhibitor/ sealant date ft bbls ft al 1A-26 50029221150000 1901660 SF n/a 12" n/a 2.6 8/1/2010 1A-27 50029221240000 1901800 SF n/a 27" n/a 4.3 8/1/2010 1 D-03 50029204080000 1790840 17" n/a 17" n/a 1 8/2/2010 1 D-06 50029204180000 1790960 16" n/a 16" n/a 1.7 8/2/2010 1 D-07 50029204300000 1791120 17" n/a 17" n/a 4.3 8/2/2010 1L-05 50029211550000 1841230 17" n/a 17" n/a 3.4 8/1/2010 1L-21 50029220439000 1910060 17" n/a 17" n/a 4.3 8/1/2010 1L-24 50029221700000 1910660 32" n/a 32" n/a 7.5 8/1/2010 i ~~~~~~~ Schlumberger -DCS 2525 Gambell Street, Suite 400 Anchorage, AK 99503-2838 ATTN: Beth Well Job # Please sign and return one copy of this transmittal to Beth at the above address or fax to (907) 561-8317. Thank you. ~~~~ -- 08/06/08 N0.4803 Company: Alaska Oil & Gas Cons Comm Attn: Christine Mahnken 333 West 7th Ave, Suite 100 ~"~~~® ~~~ ~ ~ ~~~~ Anchorage, AK 99501 Field: Kuparuk Log Description Date BL Color CD 1A-22 12097412 GLS - (p 07/22/08 1 1 2G-04 12096519 PROD PROFILE - 07/23/08 1 1 1A-22 12097413 PROD PROFILE - ~ 07/23/08 1 1 1A-28 11998847 PROD PROFILE / 07/24/08 1 1 1A-25 11996848 PROD PROFILE % 07/25/08 1 1 2A-08 11996649 INJECTION PROFILE 07/26/08 1 1 1 E-112 12080408 INJECTION PROFILE 07/27/08 1 1 2W-05 12080409 INJECTION PROFILE 07!28/08 1 1 3J-10 12097408 SBHP SURVEY 07/20/08 1 1 3M-28 12097411 SBHP SURVEY C - ~( 07/21/08 1 1 1 L-15 11982443 PROD PROFILE 07/06/08 1 1 30-08A 12080407 SBHP SURVEY zC. f Oj'-} - t43 / fO~- 07/26/08 1 1 3Q-09 12080408 SBHP SURVEY /(p ~~ 07/26/08 1 1 1L-24 11978488 PRODUCTION PROFILE 07/28/08 1 1 1 F-17 12080410 PRODUCTION PROFILE '~( ~ (p 07/29/08 1 1 30-11 12100430 SBHP SURVEY _p[~ 07/31/08 1 1 2M-06 12100433 INJECTION PROFILE 08/02/08 1 1 1H--~, 12100434 INJECTION PROFILE tJZ.C. ! '3 {0 08/03/08 1 1 UGNU DS2-OBI 11998650 TEMPERATURE LOG ~ 07/27/08 1 1 2X-14 12100432 LDL G .. ~- 08/01/08 1 1 i F-20 12100435 PRODUCTION P OFILE ! 08/04/08 1 1 iH-09 12100436 INJECTION PROFILE U 08/05/08 1 1 • ~~ STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS Repair Well 0 Abandon D Alter Casing D Change Approved Program D 2. Operator Name: ConocoPhillips Alaska, Inc. 3. Address: 1. Operations Performed: Plug Perforations D Stimulate D Waiver D D Time Extension D Re-enter Suspended Well D 5. Permit to Drill Number: Other Pull Tubing D Operat. ShutdownD Perforate New Pool D Perforate D 4. Current Well Status: Development - 0 Stratigraphic D 191-066/ 6. API Number: 50-029-22170-00 Exploratory D Service D P. O. Box 100360, Anchorage, AK 7. KB Elevation (ft): RKB 39' 8. Property Designation: ADL 25664, ALK 473 9. Well Name and Number: 1 L-24 11. Present Well Condition Summary: 10. Field/Pool(s): Kuparuk River Field 1 Kuparuk Oil Pool Total Depth Effective Depth Casing Structural CONDUCTOR SUR. CASING PROD. CASING Perforation depth: measured 9241' feet true vertical 6287' feet measured 8692' feet true vertical 5938' feet Length Size MD 80' 16" 122' 5042' 9-5/8" 5081' 9202' 7" 9241' Plugs (measured) Junk (measured) 8672' TVD Burst Collapse 122' 3610' 6286' Measured depth: 8735'-8782', 8920'-8949', 9010'-9029' r~~ ~:": ,;, ':- ", F~' i: ~:. ,::1 T ,. !,! ,,: true vertical depth: 5966'-5996',6084'-6102',6141'-6153' J ¡J l ,;. ,;~. ',~\JU4 ," :_:::.,: \~! ' Tubing (size, grade. and measured depth) 3-112" . J-55, 8655' MD. .' , Packers & SSSV (type & measured depth) pkr= Baker FHL, TIW 'HM-1' pkr= 8491',8604' SSSV= NIP SSSV= 513' 12. Stimulation or cement squeeze summary: Intervals treated (measured) NIA 13. Treatment descriptions including volumes used and final pressure: Representative Daily Average Production or Injection Data Gas-Met Water-Bbl 625 672 429 1146 15. Well Class after proposed work: Exploratory D Development 0 16. Well Status after proposed work: oil0 GasD WAGD GINJD WINJ D 17. I hereby certify that the foregoing is true and correct to the best or my knowledge. Sundry Number or N/A If C.O. Exempt: Prior to well operation Subsequent to operation 14. Attachments Copies of Logs and Surveys run - Daily Report of Well Operations _X Contact Aras Worthington @ 265-6802 /' Printed Name Aras ~ington V" . .' Title Signature // ~ / ,..7,." Phone ~-. R/~/ Form 10-404 Revised 04/2004 R8DMS BFL Oil-Bbl 120 116 Casinq Pressure Tublnq Pressure 150 149 Service D WDSPLD Wells Group Engineer Date ://11 /~Ji1: Pref)areCl Vv SnarL'n AII$uf)-Dra/(e 2ô3..Jô 12 .'Ul 2 0 1004 Submit Original Only ConocoPhillips Alaska Operations Summary Report Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: Date 1 L-24 1 L-24 WORKOVER/RECOMP Nabors 3S 6/9/2004 From - To Hours Code Sub Phase Code 09:00 - 11 :00 2.00 MOVE MOVE WRKOVR 11 :00 - 17:00 6.00 MOVE MOVE WRKOVR 17:00 - 19:00 2.00 MOVE MOVE WRKOVR 19:00 - 21 :00 2.00 MOVE MOVE WRKOVR 21 :00 - 22:30 1.50 MOVE MOVE WRKOVR 22:30 - 00:00 1,50 RIGMNT RGRP WRKOVR 00:00 - 01 :00 1.00 RIGMNT RGRP WRKOVR 01 :00 . 03:00 2.00 MOVE MOVE WRKOVR 03:00 - 06:00 3.00 MOVE MOVE WRKOVR 06:00 - 08:00 2.00 WELCTL KILL WRKOVR 08:00 - 09:00 1.00 WELCTL NUND WRKOVR 09:00 - 14:30 5.50 WELCTL KILL WRKOVR 6/10/2004 14:30 - 15:00 0.50 WELCTL OBSV WRKOVR 15:00 - 22:00 7.00 WELCTL NUND WRKOVR 22:00 - 00:00 2.00 WELCTL BOPE WRKOVR 6/11/2004 00:00 - 02:00 2.00 WELCTL BOPE WRKOVR 02:00 - 02:30 0.50 WELCTL BOPE WRKOVR 02:30 - 03:00 0.50 CMPL TN TRIP WRKOVR 03:00 - 03:45 0.75 CMPLTNTRIP WRKOVR 03:45 - 04: 15 0.50 CMPL TN TRIP WRKOVR 04:15 - 05:00 0.75 CMPL TN CIRC WRKOVR 05:00 - 08:00 3.00 CMPLTN TRIP WRKOVR 08:00 - 08:30 0.50 CMPL TN TRIP WRKOVR 08:30 - 16:00 7.50 CMPLTNTRIP WRKOVR 16:00 - 19:00 3.00 CMPL TN PULD WRKOVR 19:00 - 19:30 0.50 CMPL TN SFTY WRKOVR 19:30 - 00:00 4.50 CMPL TN RUNT WRKOVR 6/12/2004 00:00 - 00:45 0.75 CMPLTN RUNT WRKOVR Page 1 of 2 Start: 6/10/2004 Rig Release: 6/13/2004 Rig Number: Spud Date: 5/14/1991 End: 6/13/2004 Group: Description of Operations Break apart BOPE for transport. Prep pipe shed for move. Prep rig to lower derrick. Lowered derrick @ 11 :00 hrs. Rigging down Hand-Y-Berm. RID sub. pipe shed & motor complex. Prep for move. Trucks lined up to move rig @ 1400 hrs. Trucks on location and Begin Rig Move to 1 L-24. Move Rig from 2T -220 to 1 L -24. Rig Camp on location and all communication systems re-established. Moved Rig onto 1 L-Pad Repaired steam lines under the rig floor. Repair steam line and sub beam on the carrier. Move Rig over well and mate up the pipe shed and the pits. Complete setting up Rig. APC on location to RU hardline from IA to Open Top Tanks. Accept Rig @ 06:00 Pick -up FMC lubricator and removed BPV. RIU hard line from wellhead to tanks. Load pits with water. Open well, tubing =1100 psi OA = 1100 psi. Displaced wellbore fluids with water (300 bbls.) taking returns to tanks, holding backpress while circulating Followed this with 362 bbls of 11.0 ppg brine through open GLM @ 8537'. Shut down. monitor well. Tbg.= 0 OA O. Well Dead. Shut down, monitor well. Well dead. bg = 0 OA = O. Reset BPV. ND tree, NU BOPE. Installed Test Plug and Test Joint. Pulled Gravel out out of cellar and installed Mouse hole. AOGCC State Inspector (John Crisp) Waived witness of BOP Test 20:00 hrs 6/10/04. Began BOP test but had a leak. It appears to be the Test plug. Removed Test plug and Test joint and test plug. Test plug showed signs of leaking. Redressed Test Plug. Re-set Test plug and Test Jt and continued BOP test. Test completed. Pulled Test plug and Test joint. Verified Well is dead and pulled BPV. BOLDS and pulled Hanger to the floor. Weight was bouncing as we pulled up on tubing. Max pull was 90k then it broke back to 80k and weight was bouncing as if dragging something up. Prepared rig floor for tubing pull. Picked up tongs and slips. Picked up Halliburton spooling unit and RU same. Pulled 2 joints and racked back. Weight is still bouncing and dragging current Up wt is 75k. Attempted to fill the hole and it appears that it is out of balance. Took app: 7 bbls to fill hole. Decided to circulate Circulate @ 4 bpm, pumping 11 # brine down the tubing and taking returns from backside. Pumped a total of 75 bbls. SID the pump and monitored appears to have balanced out. Continued pulling tubing & racking back doubles. Pipe looks to be in good shape. NID SSSV and laid down. RID Haliburton spooler. Continued pulling tubing & racking back doubles, strapping pipe. Pulled seal assembly from PBR. All tubing pulled form well. Build pipe tally for new completion. Prep floor for the completion run. Load pipe shed with jewelry. Pulled seals oH of the TRW seal assy for new completion run. Held Pre- Job on completion run. Pick up jewelry and start running completion. Located ball and rod and verified 2.812" DS nipple has an RHC in it. Drifting tubing & GLM Assy wI 2.867" rabbit. Continued running new completion, drifting all tubing and GLM assemblies with 2.867" rabbit. PrInted. 7/13/200..\ 2 12.04 PM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: Page 2 of 2 ConocoPhillips Alaska Operations Summary Report 1 L -24 1 L-24 WORKOVER/RECOMP Nabors 3S Date Sub From - To Hours Code Code Phase 6/12/2004 00:45-01:15 01:15-05:15 05:15 - 09:30 09:30 - 10:00 10:00 - 11 :00 11 :00 - 17:00 17:00 - 17:30 17:30 - 18:30 18:30 - 19:00 19:00 - 19:15 19:15-20:30 20:30 - 21 :00 21 :00 - 00:00 0.50 RIGMNT RGRP WRKOVR 4.00 CMPL TN RUNT WRKOVR 4.25 CMPL TN RUNT WRKOVR 0.50 CMPL TN PCKR WRKOVR 1.00 CMPL TN PCKR WRKOVR 6.00 CMPL TN SUN WRKOVR 0.50 CMPL TN PCKR WRKOVR 1.00 CMPL TN CIRC WRKOVR 0,50 CMPL TN SOHO WRKOVR 0.25 CMPL TN SFTY WRKOVR 1.25 CMPL TN DEQT I WRKOVR 0.50 WELCTL NUND WRKOVR 3.00 WELCTL NUND WRKOVR Start: 6/10/2004 Rig Release: 6/13/2004 Rig Number: Spud Date: 5/14/1991 End: 6/13/2004 Group: Description of Operations Shut down and repaired the crown saver. Resumed running new completion. drifting all tubing and GLM assemblies with 2.867" rabbit. Reached point where we have to start drifting pipe with 2.910" drift, Rabbit stuck in the first joint attempted. Lay joint down in pipe shed and attempt to retreive rabbit. Due to trouble drifting used pipe to 2.910". Picked up new L-80 tubing to replace top 500'. M/U floor valve, established circ. lowering pipe to see seal assembly enter seal bore. Pumping at 600 psi press increased to 630 when entering seal bore. shut down pump. Up wt = 65K Dwn wt = 43K.Spaced out 1 foot from bottom, dropped ball and rod, waited 45 min. attempted to press up. Ball not on seat. Worked pipe up and down, waited and tried again with no luck gettin ball to seat. Called out slickline, RIU and ran 2.55" centrilizer with weight to push ball down to seat. Tagged up at 8556', set down two or three times and POOH with slickline. RD slickline. NU floor valve,Begin pressure up to 1500 psi set packer. raised press to 2500 wait 5 min. bled off to 1500 psi. Pulled 25K over string wt and sheared PBR. Bled press off and space out with 1- 6' pup. NU hanger. NU landing jt. with floor valve. Established cir. pumped 20 bbls of 1°0 corrosion inhibited 11# brine, followed by 70 bbls of 11 # brine. Spaced out and prepped to land the Hanger. Drained the stack. Landed hanger and RILDS. Pre-job and pressure testing of packer & tubing. Pressured up on the tubing to 2750 psi. Had IA open to atomsphere. Charted test for 15 mins (good test). Bled tubing back to 1500 psi and pressured up on IA to 2500 psi. Charted test for 15 mins (good test). Bled the tubing down slowly and sheared SOV in GLM @ 8441'. Bled both Tubing and IA to 0 psi. Removed landing joint and installed BPV. Emptied the pits. Nipple down BOPE pr,nred 711 31200~ 2.12:04 PM ~ ConocoPhillips Alaska, Inc. ~ 1L-24 API: 500292217000 SSSV Type: NIPPLE TUBING (0-8655. OD 3 500. ID'29921 SEAL 18590-3591, ODA.50C¡¡ PBR 18591-3592. OD 3.500) PKR 1860-1-8605. OD 6.1561 NIP 18621-8622. OD:35üO, 80S 1865-1-8655. OD:35üOI ïTL 18655-8656 OD:3.50ü) Perf 18735,8782) P",rf 13920-89-191 P€:" \9010-90291 J~ ,J~ -~ I t- I I ~ ~ I-II . - Annular Fluid: Well Type. PROD Orig 5/23/1991 Completion: Last W/O: 6/1212004 Reference Log: 39'RKB Last Tag: 8692 Sand Plug Last Tag Date: 6/20/2004 Casing String - ALL STRINGS Description CONDUCTOR SUR. CASING PROD. CASING Tubing String - TUBING Size I Top 3.500 0 Perforations Summary Interval TVD 8735 - 8782 5966 - 5996 Ref Log Date. TO: 9241 ftKB Max Hole Angle: 53 deg @ 4700 Size Top Bottom 16.000 0 122 9625 0 5081 7.000 0 9241 Bottom TVD Wt 8655 5915 9.30 Zone C-4 A-5 A-4 GLV GLV GLV OV DMY KRU Angle @ TS: 50 deg @ 8735 Angle @ TO: 51 deg @ 9241 1 L-24 Rev Reason: WORKOVER. GLV design, Tag, Pull Ball/Rod Last Update. 6/23/2004 TVD 122 3610 9241 Grade H-40 J-55 J-55 Status Ft SPF Date Type Comment 47 6 8/20/1991 IPERF 2 1/8" Flow Jet Stri. 0 deg. ph 29 4 6/18/1991 IPERF 4.5" Carrier; 180 deg. ph 19 4 6/18/1991 IPERF 4.5" Carrier; 180 deq. ph 8920 - 8949 6084 - 6102 9010 - 9029 6141 - 6153 Gas Lift MandrelsNalves St MD TVD Man Man Type V Mfr V Type V OD Latch Port TRO Mfr 1 3471 2583 CAMCO KBUG-M 2 5509 3900 CAMCO KBUG-M 3 6932 4785 CAMCO KBUG-M 4 7879 5408 CAMCO KBUG-M 5 8426 5767 CAMCO KBUG-M Other (plugs, equip., etc.) - JEWELRY Depth TVD Type 32 32 HANGER 513 510 NIP 8477 5800 PBR 8491 5809 PACKER 8572 5861 NIP 8590 5873 SEAL Wt 6250 36.00 26.00 I Grade I J-55 Thread EUE AS MOD 1.0 1.0 1.0 1.0 1.0 Date Run 0.156 1344 6/20/2004 0.188 1370 6/20/2004 0.250 1467 6/20/2004 0.250 0 6/20/2004 0.000 0 6/20/2004 BK-5 BK-5 BK-5 BK-5 BEK Description FMC GEN IV TUBING HANGER set 6/12/2004 CAMCO 'OS' LANDING NIPPLE set 6/12/2004 BAKER 80-40 PBR set 6/12/2004 BAKER FHL PACKER set 6/12/2004 CAMCO 'OS' NIPPLE set 6/22/2004 TIW SEAL ASSEMBL Y/PBR. STABBED INTO EXHISTING PBR, set 6/12/2004 TIW 10' stroke TIW'HM-1' Cameo '0' Nipple NO GO TIW 8591 5874 8604 5882 8621 5893 8654 5914 8655 5915 8672 5926 Generat Notes Date Note 6/12/2004 TREE: CAMERON I GEN 5/3-1/8" I 5000 psi TREE CAP CONNECTION: 3" PBR PKR NIP SOS TTL PLUG SAND PLUG set FOR WORKOVER Thread Vlv Cmnt ID 2.992 2.875 2.980 2.930 2.812 3.000 3.000 3.500 2.750 2.992 2.992 0.000 THE MATERIAL UNDER THIS COVER HAS BEEN MICROFILMED ON OR BEFORE NOVEMBER 2, 2000 P M C:LORIkMFILM.IX3C E E L E W A TE R IA L U N D ER TH IS M A R K ER ARCO Alaska, Inc. Post Office Bo~, ~i00360 Anchorage, Alaska 99510-0360 Telephone 907 276 1215 January 5, 1994 Mr. David W. Johnston, Chairman Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 'Dear Mr. Johnston' Attached in duplicate are multiple Reports of Sundry Well Operations (Form 10-404) notices in the Kuparuk field. The wells are listed below. WELL ACTION ~-:,- ¢~ j, 1B-1 2 Other (SSSV) ?~-1B-1 2 Perforate ',1 B-12 Stimulate ~>-~:~u~ 1F-02 Stimulate ~l---bb 1 L-24 Perforate c/-~_~l 1Y-23 Stimulate q~-ffl 1Y.-34 Stimulate If you have any questions, please call me at 263-4241. Sincerely, P. S. White Senior Engineer Kuparuk Petroleum Engineering ARCO Alaska, Inc. is a Subsidiary of AtlanticRichfleldCompany STATE OF ALASKA ~"" A~_/-~SKA OIL AND GAS CONSERVATION COMIv,,,&SION REPORT OF SUNDRY WELL OPERATIONS 1. Operations Performed' Operation Shutdown Stimulate Plugging Pull tubing ~ Alter casing Repair well Perforate X Other 2. Name of Operator ARCO Alaska, Inc. 3. Address P. O. Box 100360, Anchorage, AK 99510 5. Type of Well: Development X Exploratory _ Stratigraphic _ Service 4. Location of well at surface 567' FNL, 143' FEL, Sec. 31, T11N, R10E, UM At top of productive interval 1309' FNL, 1129' FEL, Sec. 6, T10N, At effective depth 1632' FNL, 1257' FEL, Sec. 6, T10N, At total depth 1699' FNL, 1263' FEL, Sec. 6, T10N, R10E, UM R10E, UM R10E, UM 12. Present well condition summary Total Depth: measured 9 241 ' true vertical 6286' feet Plugs (measured) feet 6. Datum elevation (DF or KB) t30' RKB 7. Unit or Property name Kuparuk River Unit feet 8. Well number 1 L-24 9. Permit number/approval number ,,. 91-66 10. APl number 50-029-22170 11. Field/Pool Kuparuk River Oil Field/Pool Effective depth: measured 91 55' feet Junk (measured) true vertical 6 232' feet Casing Length Size Cemented Measured depth Structural Conductor 1 22' 1 6" 235 Sx AS I 1 2 2' Surface 5081 ' 9 5/8" 750 Sx Type E & 5081 ' Intermediate 550 Sx Class G Production 9 241 ' 7" 250 Sx Class G Prem. 92 41 ' Liner Perforation depth: measured 8735'-8785',8920'-8948',901 0'-9028' true vertical 5965'~5996',6084'-61 01 ',61 40'-61 52' Tubing (size, grade, and measured depth) 3 1/2" 9.3#, J-55, 8655' Packers and SSSV (type and measured depth) Packer: TIW HM-1 @ 8601'; SSSV: Camco TRDP-4A-SSSV @ 1817' True vertical depth 122' 3609' 6286' RECEIVED 13. Stimulation or cement squeeze summary Reperforated "C4" Sand @ 4 SPF on 11/1 & 11/5, 1993. Intervals treated (measured) 8735'-8785' Treatment description including volumes used and final pressure N/A ,.tAN -" b 0it & 6as Cons. Commissio~ Anchorage 14. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcr Water-Bbl Casing Pressure Tubing Pressure Prior to well operation 558 222 36 1200 160 Subsequent to operation 15. Attachments Copies of Logs and Surveys run __ Daily Report of Well Operations X 662 160 35 1200 16. Status of well classification as: Oil X__ Gas Suspended __ Service 180 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed 1~404~~ ~ Engineer , Title Sr. Form Rev 06/15/88 SUBMIT IN DUPLICATE ii WELL 1L-24 'DATE 11/5/93 DAY 3 II ARCO Alaska, Inc. Subsidiary of Atlantic Richfield Company DESCRIPTION OF WORK Complete 'C4' sand reperforation CONTRACTOR / KEY PERSON Schlumberger / Rathert PBTD (RKB) ]LAST rAG (RKB) - DArE 9241' ! 9036'- 9/30/93 TIME 0800 0910 1000 1027 1130 1215 1305 FIELD COST EST. $%115 SSSV TYPE / STATUS Camco TRDP4A-SSA / In service [ '[CHECK THIS BLOCK IF SUMMARY IS CONTINUED ON BACK ,Report 19 °F 8 °F , ] Clr. miles[ 7 mph[ shot to CCL. Displace upper tubing with 5 bbls. diesel. Tie in with CBL dated 6/4/91. Log jewelry up to GLM #8. Drop down, tag fill at 9021' and pull up to 8731' (CCL). Perforate 8735' to 8765' rkb. POOH. Gun failed to fire. Checked out gun and tool string on surface. Indications are that :he failure was located in the primer. Primer failed to check out with 50 ohm resistance. Was good when checked before running the gun. All other tools and gun OK. Installed new. primer and NU to rerun same gun. RIH. Tie in and set CCL at 8731'. Perforate 8735' to 8765' rkb. POOH. Gun hung up half way through 'D' nipple. Pulled free at 2600~. RDMO. Ail shots fired. KUPARUI~ PETROLEUM ENOINEERING I _iL'l} Summary: w w I~l~a~ Il I ~~ Reperforated remainder of 'C4' sand from 8735' to 8765' w/2.625" Titan guns alternatin$ BH DP shots, 180" phasing, BH shots on bottom. Had one misrun due to faulty primer cap. BH charges: .45" hole W/ 1 lgr. charge. 6.85" ave. penetration. DP charges: .36" hole w/11gr, charge. 8.43" ave. ~netration. . JAN ....,5 i994 /,~ .... :'" 0il & Gas &)tis. Commission Auchor'a~ ' COMPLETE INCOMPLETE ,9. RIH w/1.375" RS, 1.8" CCL, 22" x 1.68" magnet, 2.625" X 30' Titan gun. Gun loaded with 4 spf, 180°, phasing, 0° at top, alternating B H/DP charges. B H charges on bottom (180°). 4' from top KUPARUK RIVER UNIT WELL SERVICE REPORT AFC/CC# - SCA# 230DS 10LL - 80223 A'(~CUMULATED COST $16,381 LOG ENTRY MIRU. SI well. Held safety meeting. NU and armed gun. PT to 10(O. ARCO Alaska, In~-"_.~ Subsidiary of Atlantic Richfield Company WELL SERVICE REPORT CONTRACTOR FIELD- DISTRICT- STATE oPERATION AT REPORT TIME REMARKS c ¢ I 230D.5/0~ NUt r,:~(¢k, i~Ei ROLtc. UM ENGiNEERiNG 0730 Ai~ 5chl~6~r~, F7 L u~ To ~/~? ~ /~o ~/. .. ¢ - · - / I -- . - !XLLL! v c [-] CHECK THIS BLOCK IF SUMMARY CONTINUED ON BACK Report oF OFI miles ~ knots ARCO Alaska, Inc. Post Office Box 100360 Anchorage, Alaska 99510-0360 Telephone 907 276 1215 December 13, 1993 Mr. David W. Johnston, Chairman Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Dear Mr. Johnston: Attached in duplicate are multiple Reports of Sundry Well Operations (Form 10-404) notices in the Kuparuk field. The wells are listed below. WELL ACTION 1 L-24 Perforate 1Y-06 Other (conversion) 1G-01 Other (conversion) 1G-01 Stimulate 2W- 1 2 Other If you have any questions, please call me at 263-4241. Sincerely, P. S. White Senior Engineer Kuparuk Petroleum Engineering RECEIVED DEC 1 7 199~ Alaska 0il & Gas Cons. Commission Anchorage ARCO Alaska, Inc. is a Subsidiary of AtlanticRichfieldCompany STATE OF ALASKA ~ OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations Performed: Operation Shutdown Stimulate Plugging Pull tubing ~ Alter casing Repair well Perforate X Other 2. Name of Operator ARCO Alaska. Inc. 3. Address P. O. Box 100360, Anchorage, AK 99510 5. Type of Well: Development X Exploratory _ Stratigraphic _ Service 4. Location of well at surface 567' FNL, 143' FEL, Sec. 31, T11N, R10E, UM At top of productive interval 1309' FNL, 1129' FEL, Sec. 6, T10N, R10E, UM At effective depth 1632' FNL, 1257' FEL, Sec. 6, T10N, R10E, UM At total depth 1699' FNLr 1263' FEL~ Sec. 6, T10N~ R10Er UM 12. Present well condition summary Total Depth: measured 9 2 41 ' feet true vertical 6286' feet Plugs (measured) 6. Datum elevation (DF or KB) 130' RKB 7. Unit or Property name Kuparuk River Unit feet 8. Well number 1 L-24 9. Permit number/approval number 91-66 10. APl number 50-029-22170 11. Field/Pool Kuparuk River Oil Field/Pool Effective depth: measured 9155' feet Junk (measured) true vertical 6232' feet Casing Length Size Cemented Measured depth Structural Conductor 1 2 2' I 6" 235 Sx AS I 1 2 2' Surface 5081' 9 5/8" 750Sx TypeE& 5081' Intermediate 550 SX Class G Production 9241' 7" 250 Sx Class G Prem. 9241 ' Liner Perforation depth: measured 8735'-8785',8920'-8948',9010'-9028' true vertical 5965'-5996',6084'-61 01 ',61 40'-61 52' Tubing (size, grade, and measured depth) 3 1/2" 9.3#, J-55, 8655' Packers and SSSV (type and measured depth) Packer: TIW HM-1 ~ 8601'; SSSV: Camco TRDP-4A-SSSV ~ 1817' 13. Stimulation or cement squeeze summary Reperforated "C4" Sand @ 4 SPF on 11/1 & 11/5, 1993. Intervals treated (measured) 8735'-8785' Treatment description including volumes used and final pressure N/A True vertical depth 122' 3609' 6286' RECEIVED DEC 1 7 19 ,t Alaska 0il & Gas Cons. C0mmissio Anchorage 14. Prior to well operation Subsequent to operation Reoresentative Daily Average Production or In!ection Data OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure . 624//~ 143 33 1200 / 6 6 2 160 35 1200 Tubing Pressure 217 232 15. Attachments Copies of Logs and Surveys run Daily Report of Well Operations 16. Status of well classification as: Oil X Gas Suspended ~ Service 7. I hereby certify that the foregoing is true and correct to the best of my knowledge. Si~ned Title Sr. Engineer Form 10-404 Rev 06/15/88 SUBMIT IN DUPLICATE ARCO Alaska, Inc. O Subsidiary of Atlantic Richfield Company WELL DESCRIPTION OF WORK 1L-24 Complete 'C4' sand reperforation DATE CONTRACTOR / KEY PERSON 11/5/93 Schlumberger / Rathert DAY 3 O8OO 0910 1000 1027 1130 1215 1305 PBTD (RKB) 9241' ILAST TAG (RKB) - DATE 9036' - 9/30/93 LOG ENTRY KUPARUK RIVER UNIT ' WELL SERVICE REPORT [AFC/CC# . SCA# , I ,230DSIOLL- 80223 FIELD COST EST. IACCUMULATED COST $9,115 I ,$16,381 SSSV TYPE / STATUS Camco TRDP-4A-SSA / In service MIRU. SI well. Held safety meeting. NU and armed gun. PT to 1000~. RIH w/1.375" RS, 18" CCL, 22" x 1.68" magnet, 2.625" X 30' Titan gun. Gun loaded with 4 spf, 180° phasing, 0° at top, alternating BH/DP charges. BH charges on bottom (180% 4' from top shot to CCL. Displace upper tubing with 5 bbls. diesel. Tie in with CBL dated 6/4/91. Log jewelry up to GLM #8. Drop down, tag fill at 9021' and pull up to 8731' (CCL). Perforate 8735' to 8765' rkb. POOH. Gun failed to fu'e. Checked out gun and tool string on surface. Indications are that the failure was located in the primer. Primer failed to check out with 50 ohm resistance. Was good when checked before running the gun. All other tools and gun OK. Installed new primer and NU to reran same gun. RIH. Tie in and set CCL at 8731'. Perforate 8735' to 8765' rkb. pOOH. Gun hung up half way through 'D' nipple. Pulled free at 2600~. RI)MO. All shots fired. KUPARUK PETROLEUM ENC!NEE?{' ;q Reperforated remainder of 'C4' sand from 8735' to 8765' w/2.625" Titan guns altematin$ BH DP shots, 180° phasing, BH shots on bottom. Had one mismn due to faulty primer cap. BH charges: .45" hole w/1 lgr. charge. 6.85" ave. penetration. DP charges: .36" hole w/1 lgr. charge. 8.43" ave. penetration. { CHECK q,'liis BLOCK IF SUMMARY IS CONTINUED ON BACK Weather Report RECEIVED DEC 1 7 Anchorage Temp. 19 OF Chill Factor 8 °F INCOMPLETg ARCO Alaska, Subsidiary of Atlantic Richfield Company I PBD~2 ~ 4-/ CONTRACTOR REMARKS WELL SERVICE REPORT IFIELD - DISTRICT- STATE OPERATION AT REPORT TIME · c c, 230D5/0~ S~A ~ ?o/z3 0730 /000 Woo 1!5o · IZ4.S !~Yo RECEIVED DEC 1 7 1995 Aiaska Oil 8, 6as 6on$. f3ommissmr' Anchorage f-J CHECK THIS BLOCK IF SUMMARY CONTINUED ON BACK Weather I T®mP'Report q'- °F [ Chill Factor VisibilitY0F miles Iwind vel'~, knots ARCO Alaska, Inc. Date: February 21, 1992 Transmittal Ct: 8369 RETURN TO: ARCO Alaska, Inc. Attn: Maria Trevithick Kuparuk Operations File Clerk ATO-1119 P.O. Box 100360 Anchorage, AK 99510-0360 Transmitted here with are the following items. Please acknowledge receipt and return one signed copy of this transmittal. 3Q-03 LIS Tape and Listing 1 -27-92 92095 3 R- 12 D LIS Tape and Listing' 2 - 4 - 9 2 92115 THE FOLLOWING LIS TAPES ARE STAMPED WITH A CORRECTED COPY STAMP. PLEASE REPLACE THE PREVIOUS COPY THAT YOU HAVE ALREADY RECEIVED WITH THIS ONE. THANK YOU. ?/-'"//f"/ I R - 1 7 ~/ .../,¢~ I R-20 ? / ..../,/.¢ 1R-21 .,¢,/_/o~' 1R-22 :~l.../o/ 1R-23 ¢/.-.¢$ 1R-24 ~,/.--¢=- I R-26 ?/.../~-"- I R-27 ¢/- ¢¢' I R-29 Receipt LIS Tape and Listing 9 - 1 9 - 91 92026 LIS Tape and Listing 9 - 9 - 91 92026 LIS Tape and Listing 1 0-6-91 92026 LIS Tape and Usting 9 - 2 4 - 91 92026 LIS Tape and Listing I 0 - 2 2 - 91 92026 LIS Tape and Listing 7 - 3 0 - 91 92026 LIS Tape and Listing 7 - 1 8 - 91 92026 LIS Tape and Listing 8 - 3 1 - 9 1 9 2 0 2 6 LIS Tape and Listing 8 - 1 4 - 9 1 9 2 0 2 6 LIS Tape and Listing ,, 6 - 1 9 - 9.1 9 2 0 2 6 LIS Tape and Listing . ,/~ 11-11-91 92026 LIS Tape and Listing ~~,.~ 1 1 I - 1 7 - 9 1 9 20 2 6 LIS Tape and Listing 5 - 9 - 9 1 9 2 0 2 6 LIS Tape and Listing 5 - 1 9 - 9 1 9 2 0 2 6 LIS Tape and Listing 5 - 2 6 - 9 1 9 2 0 2 6 LIS Tape and Listing 6 - 3 - 9 1 9 2 0 2 6 Acknowledged: R-EC--E VE D DISTRIBUTION: Lynn Goettinger FEB 2 8 1992 Alaska 0ii & Gas Cons. Commission Anchorage State of Alaska ARCO Alaska, inc. Date: February 7, 1992 Transmittal #: 8355 RETURN TO: ARCO Alaska, Inc. Attn: Maria Trevithick Kuparuk Operations File Clerk ATO-1119 P.O. Box 100360 Anchorage, AK 99510-0360 Transmitted here with are the following Open hole items. and return o. ne signed copy of this transmittal. ~l"l ~'~'~I2M'102M-10 3QQ:04 Litho-Density & Casing Neutron 'Porosity Data Litho-Density & Casing Neutron Raw Data C[~ ~' 1-12-16-92 CDR ~ 1-12-16-92 CCN ~ 1-24-27-92 1 1-29-91 & 12-29-91 I I-29-91 & 12-29-91 Please acknowledge receipt 7000-7756,~ ~ 7000-7669 7000-7756 7000-7669 4517.7-7720 4517.7-7720 5090-9640 3Q'03 3Q-03 CDR ~ 1-24-27-92 5090-9640 · , THE FOLLOWING LOGS ARE CORRECTED COPIES. IT HAS BEEN REQUES~'~ I THAT YOU THROW OUT THE PREVIOUS (UNCORRECT) COPY OF THIS LOG. ~,.3]'HANK Y~OU. _ · 1L-2~ ~ 5-9-13-91 5 I L- 2 6 (~-~~ ~ 6-3-6-91 5 2M-19~ ~ 3 2M-21~/ ~ 3 1 R-17~ ~ 5 1R-19 / 5 1R-2OJ - ~.~>1 R-26 '/ ~ 5 ~;~1 R-27~ ~ / 6 6 1L-25 ~ ~ ~ 4 1'1:-17-'91 11-11-91 9-15-19-91 6-19-23-91 · 9-9 91 10-6-11-91 9 24-29-91 10-22-91 7-30/8-5-91 7-18-21-91 8-31 -91 8-14-91 5-19-22-91 5-26-29-91 22510065 835 9250 914 1 0599 698 10345 ~~/~7~ 390-9841 568-1OO8O O7O-1O18O 001-10813 330-12188 753-12972 591-10218 547-9250 042-11 368 081-9241 ~ 978-9352 / RECEIVED Alaska 0il & Gas Cans. Commission Anchorage STATE OF ALASKA AL~A OIL AND GAS CONSERVATION COI~r-'~slON i: !! !-',:~ :i '" WELL COMP,. TION OR RECOMPLETION Rr..dORT AND LOG I Status of Well Classification of Se~ce Well OIL I-;i G,s !--'i SUS .DED l--I ^BAN[X .-'D I'"1 SE.V,:E I---i 2 Name of Operator 7 Permit Number ARCO Alaska, Inc 91-66 3 Address 8 APl Number P.O. Box 100360, Anchorage, AK 99510-0360 50-029-22170 4Locationofwellatsurfece ~ -~~[; 9 UnltorLeeseName 567' FNL, 143' FEL, SEC 31, T11N, R10E, UM KUPARUK RIVER I V'I~R'JJ::IE,~ I 10 Well Number At Top Producing Interval ii / ~ ;'rtl 1699' FNL, .1.a6a' FEL, SEC 6, T10N, R10E, UM ,; KUPARUK RIVER FIELD 5 Elevation in feet (indicate KB, DF, etc.) J 6 Lease Dasignetio~ and Serial No. KUPARUK RIVER OIL PCX3L RKB 130', PAD 87' GLI ADL 25664 ALK 473 12 Date Spudded 13 Date T.D. Reached 14 De. re Comp., Susp. or Aband. I 15 Wa~' [~I~, If o~shore /16 5/14/91. 5/21/91. 6119/91. NA feet MS4 1 9241' M D, 6286' TVD 9155' M D, 6232' TVD YES ~ NO J'"'J 1817' feet MO 1500' APPROX 22 Type Electric or Other Logs Run CDN/CDR, GR, CNL, CET, CBL, GYRO 23 CASING, LINER AND CEMENTING RECORD SETTING DEPTH MD CASING SIZE WT. PER FT. GRADE TOP Bo'FrOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED 16" 62.5# H-40 SURF 122' 24" 235 SX AS 1 9-5/8" 36# J-55 SURF 5081' 12-1/4" 750 SX TYPE Er 550 SX CLASS G 7" 26# J-55 SURF 9241' 8-1/2" 250 SX CLASS G PREM. 24 Perforations open to Production (MD+TVD of Top and Bottom and 25 TUBING RECORD interval, size and number) SIZE_ DEPTH SET (MD) PACKER SET (MD) 3-1/2" 8655' 8604' 8920'-8948' W/4-1/2" CSG GUN @ 4SPF MD 6084'-6101' TVD 9010'-902e' W/4-1/2" ~ GUN @ 4SPF MD 6140'-6152' TVD 26 ACID, FRACTURE, CEMENT SQUEEZE, ETC DEPTH INTERV .AL IMD) AMOI.JNT & KIND OF MATERIAL USED SEE ATTACHED ADDENDUM 27 PROOUCTION TEST Date First Production Jldelhod of Operation (Flowing, gas lift, etc.) I , Date of Test Hours Tested PRODUCTION FOR OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE J GAS-OIL RATIO I TEST PERIOD Flow Tubing Casing Pressure CALCULATED OIL-B81_ GAS-~ WATER-BBL OIL GRAVITY-APl (corr) iPress. 24-HOUR RATE 28 CORE DATA Brief description of Illhology, porosity, fractures, apparent dips and presence of oli, gas or water. Submit core chips. RECEIVED AUt3 1 9 1991 Alaska 0il .& Gas Cons. q lcb oraga Form 10-407 Submit In duplicate Rev. 7-1-80 ~D ON I:EVERSE SIDE GEOLOGIC MARKERS FORMATION I~ESTS NAME Include interval tested, pressure data, all fluids recoverd and gravity, MEAS. DEPTH TRUE VERT. DEPTH GOR, and time of each phase. KUPARUK C TOP 8735' 5966' NA KUPARUK C BOTTOM 8785" 5998' KUPARUK A TOP 8890' 6064, KUPARUK A BOTTOM 9036' 6157' , 31. LIST OF AI-rACHMENTS GYRO,FRAC, & WELL HISTORY : ~'~. I hereby certify that the foregoing is true and correct to the best of my knowledge . Sign Title AREA DRILLING ENGIM~ER Date CC~//~-/9 / INSTRUCTIONS General- This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Item 1' ClassifiCation of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21' Indicate whether from.ground level (GL) or other elevation (DF, KB, etc.). Item 23: Attached supplemental records for this well should show the details of any multiple stage cement- ing and the location of the cementing tool. Item 27: Meth°d of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In- jection, Gas Injection,. Shut-l~,~ Othe~-e~0taJn. Item 28: If no cores taken, indicate "none". Form 10-407 ADDENDUM WELL: 7/28/91 1 L-24 Frac KRU "A" sand perfs from 8920'-89~, 9010'-90~.~@ 4spf in 10 stages as follows: Stage 1. Stage 2 Pmp 150 bbls DEL XL GW @ 20 bpm 5700-4150 psi Pmp 85 bbls Non XL GW @ 20 bpm 4150-3473 psi Stage 3 Prop Stage 4 Pmp Stage 5 Pmp Stage 6 Pmp Stage 7 Pmp Stage 8 Pmp Stage 9 Pmp Stage 10 Pmp Pmp Pmp ISIP: 1552 600 bbls DELXL GW @ 20 bpm 3600-4600 psi 150 bbls DEL XL GW w/2ppg @ 20 bpm 4600-4875 psi 125 bbls DEL XL GW w/4ppg @ 20 bpm 4800 psi 100 bbls'DEL XL GWw/6ppg @ 20 bpm 4580 psi 75 bbls DEL XL GW w/8ppg @ 20 bpm 4570 psi 50 bbls DEL XL GW w/10ppg @ 20 bpm 4610 psi 29 bbls DEL XL GW w/12ppg @ 20 bpm 4900 psi 20 bbls DEL XL GW @ 20 bpm 4900 psi 20 bbls Non XL GW @ 20 bpm 4900 psi 7 bbls Slick Diesel 7942 psi 9.6~ @ PERFS 12/18 Average Pressure: Fluid to recover: 1111 H20 Sand in zone: 72,810 Sand in casing: Date/' ARCO ALASKA INC. DAILY OPERATIONS PAGE: 1 WELL: BOROUGH: UNIT: LEASE: API: PERMIT APPROVAL: AFE: WI: 1L-24 NORTH SLOPE KUPARUK RIVER UNIT ADL 25664 ALK 473 50-029-22170 91-66 AK6071 55.252072 SPUD: 05/14/91 RELEASE: 05/23/91 OPERATION: DRILLING RIG: POOL 7 05/14/91 ( 1) TD: 122'( 122) SUPV:JRR 05/15/91 (2) TD: 1600' (1478) SUPV:JRR 05/16/91 ( 3) TD: 4548' (2948) SUPV:CTD 05/17/91 ( 4) TD: 4664' ( 116) SUPV:CTD 05/18/91 (5) TD: 5101' ( 437) SUPV:CTD 05/19/91 ( 6) TD: 5101'( SUPV:CTD o) MOVING RIG MOVING RIG TO 1L-24. MW: 0.0 VIS: 0 DAILY:SO CUM:SO ETD:SO EFC: $1,430,000 DRILLING MW:10.0 VIS: 52 FINISH MOVE RIG F/1L-23 TO 1L-24; SKID RIG FLOOR OVER HOLE. NU AND FUNCTION TEST DIVERTER; HOOK UP FLOWLINE. PU BHA; ORIENT. TAG BTM @ 122'; FILL HOLE AND BUILD SPUD MUD WHILE CHECKING MWD TOOL. DRLD F/122'-1600' DAILY:S74,124 CUM:$74,124 ETD:$~4,124 EFC:$1,430,000 DRILLING MW:10.3 VIS: 52 DRLG F/1600'-2493'. CIRC BU; PUMP SLUG. SHORT TRIP 16 STANDS TO HWDP; NO PROBLEMS. DRLG F/2493'-2602' CHANGE SWIVAL PACKING. DRLG F/2602'-4465'. CIRC OUT GAS CUT MUD AT TOP OF WEST SAK; MUD CUT 10.3 TO 9.0 PPG, INCREASE MUD TO 10.5 PPG. DRLG F/4465'-4548', DIRECTIONAL CORRECTIONS AS NEEDED. DAILY:S65,308 CUM:$139,432 ETD:S139,432 EFC:$1,430,000 BREAK REV JET BASKET 9-5/8"@ 5081' MW:10.7 VIS: 52 DRLG F/4548'-4613'. CIRC BU, DROP SINGLE SHOT SURVEY. POH FOR BIT DUE TO HRS ON BIT #1, LOST CONE. CHANGE BIT, TIH. BREAK CIRC, FEEL FOR BIT CONE ON BTM, CANNOT FEEL JUNK. DRLG F/4613'-4664'; BIT NOT DRLG PROPERLY, CANNOT GET WT TO BIT, MUD MOTOR WILL NOT STALL, TORQUE HIGH. POH, CHECK BIT, CONE RIDING BETWEEN BIT AND STAB ON MOTOR. CUT 60' DRLG LINE. MAKE UP JET BASKET, TIH. BREAK CIRC, DROP BALL, WORK OVER BIT CONE, ATTEMPT TO CORE 5' OF FORMATION, GOT 2' POH WITH JET BASKET. BREAK JET BASKET AND RECOVERED CONE. DAILY:S52,871 CUM:$192,303 ETD:S192,303 EFC:$1,430,000 CIRC 9'5/8 CSG 9-5/8"@ 5081' MW:10.7 VIS: 48 MU BHA. PU MUD MOTOR & MWD. ORIENT MWD. TIH. DRLD 4664 TO 9 5/8 CSG PT@5101. CIRC BTMS UP. SHORT TRIP 10 STDS. CIRC HOLE CLEAN. POH-SLM-LD MUD MOTOR & MWD. RIG UP WEATHERFORD 9 5/8 CSG TOOLS. RUN 118 JTS 9 5/8 36# J-55 BTC JF LONE STAR CSG 5038' SET @ 5081'. RU CMT HEAD. CIRC 9 5/8 CSG @ 8.2 BPM 700 PSI. DAILY:S156,663 CUM:$348,966 ETD:S348,966 EFC:$1,430,000 TIH TO DRL OUT 9 5/8 CSG 9-5/8"@ 5081' MW: 8.3 VIS: 26 PUMP 50 BBL WATER SPACER. CMT W/ 750 SX TYPE E W/ .25 PPS FLOCELE MIXED AT 12.3. TAILED W/ 550 SX CLASS G W/ 2% CACL .25 PPS FLOCELE MIXED AT 15.8 PPG. DISPLACED W/ 385 BBL MUD. BUMP PLUG TO 2000 PSI. FLOAT OK. NO CMT TO SURF. RD CMT HEAD. LD LANDING JT. ND 20" DIVERTER. RU HALLIBURTON. TOP CMT JOB W/ 110 SX TYPE C MIXED AT 15.7 PPG. GOOD CMT AT SURF. MAKE UP FMC 11 3/4 BTC X 11 BRADENHEAD. TORQUE 20000 FT#. NU 13 5/8 10,000 BOP STACK. TEST BOPE ALL RAMS, LINES, VALVES TO 250 LOW & 3000 HIGH. TEST HYDRIL TO 2500 PSI. TEST TOP DRIVE IBOP & INSIDE FLOOR VALVE TO 3000 PSI OK. SET WEAR BUSHING. LD 9 5/8 CSG EQUIP. CLEAR RIG FLOOR. PU BHA. MU TURBINE, ORIENT MWD, PROGRAM & LOAD LWD LOGGING TOOLS. TIH. DAILY:S146,982 CUM:$495,948 ETD:S495,948 EFC:$1,430,000 WELL: 1L-24 OPERATION: DRILLING RIG: POOL 7 PAGE: 2 05/20/91 ( 7) TD: 6900' (1799) SUPV:CTD 05/21/91 (8) TD: 9100' (2200) SUPV:TA 05/22/91 (9) TD: 9241' ( 1.41) SUPV: TA 05/23/91 (10) TD: 9241'( SUPV:JRR o) 05/24/91 (11) TD: 9241'( SUPV:JRR o) 'DRILLING 9-5/8"@ 5081' MW: 9.2 VIS:' 42 CONT TIH. TAG CMT @ 4987'. WASH DWN TO FLOAT COLLAR @ 4992' TEST 9 5/8 CSG TO 2000 PSI OK. DRLD PLUGS & FLOAT COLLAR. LOST 500 PSI PUMP PRESS. CHECK SURF EQUIP OK. POH F/ WASH OUT-WET TRIP. DID NOT FIND WASH OUT ON TRIP OUT. CHECK BIT, MWD & LWD EQUP OK. RAN STEAM UP STANDS AS TIH. FOUND WASH OUT IN JT OF HWT DP, CRACKED TOOL JT. LD JT & REPLACE. CONT TIH. DRLD FLOAT COLLAR, CMT, FLOAT SHOE & 10' NEW FORM TO 5111'. CIRC & COND MUD. TEST FORM TO 650 PSI @ 5111'MD 3632'TVD W/9.1 MUD IN HOLE-12.5 PPG EMW. NO LEAK OFF. DRLD 5111 TO 6900. ADT 9 HRS. ROP 199 FT/HR. DIECTIONAL CORR AS NEEDED. DAILY:S50,024 CUM:$545,972 ETD:S545,972 EFC:$1,430,000 DRLG 7"@ 9240' MW:10.5 VIS: 50 DRLG F/6900'-9100', SLIDE AS NECESSARY, ADT=20 HRS DAILY: $63,554 CUM: $609,526 ETD: $609,526 EFC: $1,430,000 POH TO RUN 7" CSG 7"@ 9240' MW:10.7 VIS: 44 DRLD 9100' TO 9241'. CIRC BTMS UP. PMP DRY JOB. PULL 3 STDS HOLE DRAGGING, TIH. CIRC & COND MUD. DRY JOB. PULL 7 STDS HOLE SWABBING, RIH. CIRC & COND MUD. MUD CUT 10.5 TO 9.8# ON BTMS UP WITH OIL & GAS. WT UP F/10.5 TO 10.7#. SHORT TRIP TO SHOE. RIH. BREAK CIRC @ 9087'. CIRC & COND MUD. PMP DRY JOB. POH TO RUN 7". DAILY:S53,723 CUM:$663,249 ETD:S663,249 EFC:$1,430,000 PU BOP STACK 7"@ 9240' MW:10.7 VIS: 43 TOH. UNLOAD OPEN HOLE LOGS F/LWD TOOLS. LD BHA. PULL WEAR BUSHING. RU WEATHER FORD CSG EQUIP. RUN 7" CSG. BREAK CIRC @ 9 5/8 SHOE. NO RETURNS. FINISH RUN TOTAL 96 JTS 7" 26# J55 BTC CSG PLUS 121 JTS 7" 26# J55 BTC MOD CSG PLUS MARKR JT. FC @ 9155'& FS @ 9241'. RU CMT HEAD. CIRC @ 2 BPM WITH NO RETURNS WHILE RECIPROCATE & BATCH MIX CMT. TEST CMT LINES TO 4000 PSI. PMP 10 BBLS PREFLUSH AND DROP BTM PLUG#1. PMP 35 BBLS ARCO SPACER AND DROP BTM PLUG#2. BATCH MIXED & PMP 250 SX(54 BBLS) CLASS G CMT W/ 3% CAL SEAL + 0.6% LAP-1 + 0.3% CFR-3 + 0.5% GEL + 0.23% HR-5 + 0.02 GPS 434-B @ 15.5 PPG. (YIELD=l.23) DROP TOP PLUG & DISPLACE WITH 352 BBLS 10.6 PPG NACL-NABR BRINE. BUMPED PLUG TO 3500 PSI FOR CSG TEST. RECIPROCATED THROUGHOUT WITHOUT RETURNS. ND BOPS. RD CMT EQUIP. DAILY:S291,867 CUM:$955,116 ETD:S955,116 EFC:$1,430,000 RIG RELEASED. 7"@ 9240' MW: 0.0 VIS: 0 SET CSG SLIPS W/ 200,000#. CUT 7" CSG & SET BACK BOP STACK. NU FMC 11" 3M X 7 1/16" 5M TBG HEAD & LOWER SEAL ASSEMBLY. INSTALLED 7 1/16" 5M ADAPTOR FLANGE & 5M VALVE. TESTED TO 3000 PSI OK. INJECTED MUD AND H20 FROM INJECTION TANK. FREEZE PROTECTED 1L-23 W/ 85 BBL DIESEL. FR PROT 1L-24 W/ 85 BBL DIESEL. RIG RELEASED 1200 HRS 5/23/91. RKB TO TBG HEAD = 35.20' DAILY:S22,705 CUM:$977,821 ETD:S977,821 EFC:$1,430,000 DRILLING ~UPERINTEN~T DATE: ARCO ALASKA INC. DAILY OPERATIONS PAGE: 1 WELL: BOROUGH: UNIT: LEASE: API: PERMIT APPROVAL: AFE: WI: 1L-24 NORTH SLOPE KUPARUK RIVER UNIT ADL 25664 ALK 473 50-029-22170 91-66 AK6071 55.252072 ACCEPT: 06/17/91 RELEASE: 06/19/91 OPERATION: COMPLETION RIG: NORDIC I 06/18/91 (12) TD: 9241 PB: 9155 SUPV:DB PERFORATING 7"@ 9240' MW:10.6 NaCl/Br ACCEPT RIG @ 1600 HRS 6-17-91. NU BOP'S AND TEST. RU SWS AND PERFORATE WELL. DAILY:S30,676 CUM:$1,008,497 ETD:S1,008,497 EFC:$1,430,000 06/19/91 (13) TD: 9241 PB: 9155 SUPV:DB NORDIC 1 7"@ 9240' MW:10.6 NaCl/Br FINISHED PERFORATING WELL. RU AND RAN 3-1/2" SINGLE COMPLETION ASS'Y. SPACED OUT AND SET PACKER. SHEARED PBR. TESTED SSSV. ND BOP'S AND NU TREE. TESTED SAME. OK. FREEZE PROTECT AND SECURE WELL. RR @ 0100 HRS 6-19-91. DAILY:S187,035 CUM:$1,195,532 ETD:S1,195,532 EFC:$1,430,000 SIGNATURE:DRILLtN~~G P ~ DATE: ORlSlN4L SUB- SURFACE DIRECTIONAL SURVEY UIDANCE ~ ONTINUOUS , i"~l OOL RECEIV£D AUG 1 B 1~1 Rlas~a Oil & Gas Cons. Comm'tss[eB Rnchorage Company ARCO ALASKA, INC. Well Name 1L-24 (567' FWL, 143' FEL, SE.C 31, T11N, R10E) Field/Location_,UPARUK, NORTH SLOPE, ALASKA Job Reference No. 74763 Logged By' SCHWARTZ I I I II gate.__~/OC~ Computed BV: KRUWELL SCHLUMBERGER GCT DIRECTIONAL SURVEY CUSTOMER LISTING FOR ARCO ALASKA INC. 1L - 24 KUPARUK RIVER NORTH SLOPE, ALASKA SURVEY DATE: 3-JUNE-1991 METHODS OF COMPUTATION TOOL LOCATION: INTERPOLATION: VERTICAL SECTION: ENGINEER: SCHWARTZ TANGENTIAL- Averaged deviation and azimuth LINEAR HORIZo DIST. PROJECTED ONTO A TARGET AZIMUTH OF SOUTH 9 DEG 49 MIN WEST COMPUTATION DATE: t-AUG-91 PAGE 1 ARCO ALASKA INC. 1L - 24 KUPARUK RIVER NORTH SLOPE, ALASKA DATE OF SURVEY: 3-JUNE-1991 KELLY BUSHING ELEVATION: 130.00 FT ENGINEER: SCHWARTZ INTERPOLATED VALUES FOR EVEN 100 FEET OF MEASURED DEPTH TRUE SUB-SEA COURSE VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUTH DEPTH DEPTH DEPTH DEG MIN DEG MIN FEET DEG/IO0 FEET FEET FEET DEG MIN 0.00 0.00 -130.00 0 0 N 0 0 E 100,00 100.00 -30.00 0 12 S 52 47 E 200.00 200.00 70.00 0 28 S 19 36 E 300.00 299.97 169 97 1 59 S 4 41 W 400.00 399.63 269 63 7 26 S 8 11 W 500,00 498.01 368 01 13 29 S 6 51 W 600.00 593.80 463 80 19 30 S 6 4 W 700.00 687.09 557 09 22 6 S 7 38 W 800,00 779.08 649 900.00 869.23 739 0 O0 0 0 2 10 27 56 92 08 24 9 S 9 16 W 131 23 27 37 S 10 26 W 174 11 55 5O 18 84 32 26 46 68 0 O0 0 48 0 85 1 50 4 89 8 O2 5 62 1 75 2 1,4 5 2,4 0.00 N 0.13 S 0.14 E 0 0.62 S 0.37 E 0 2.60 S 0.39 E 2 10.22 S 0.64 W 10 27.75 S 2.91 W 27 56.10 S 6.11 W 56 91 .84 S 10.33 W 92 130.62 S 16.13 W 13'i 173.20 S 23.56 W 174 0.00 E 0 O0 N 0 0 E 2O S 46 51 E 72 S 30 52 E 63 S 8 37 E 24 S 3 33 W 90 S 6 0 W 43 S 6 13 W 42 S 6 25 W 61 S 7 2 W 80 S 7 45 W 1000.00 955.56 825 56 32 47 5 10 12 W 225 06 1100.00 1037.32 907 32 38 1 S 10 31 W 282 56 1200.00 1112.19 982 19 44 2 5 10 51 W 348 76 1300.00 1182.99 1052 99 46 13 5 11 41 W 419 35 1400.00 1250.74 1120 74 47 54 S 12 12 W 492 85 1500.00 1318.04 1188 04 47 37 5 12 36 W 566 74 1600.00 1382.80 1252.80 52 1 5 12 4 W 642.81 1700.00 1443.93 1313.93 51 53 5 11 33 W 721.90 1800.00 1506.97 1376.97 50 13 5 11 32 W 799.49 1900.00 1570.86 1440.86 50 43 S 12 16 W 876.36 4.39 7.72 279 1.84 344 4.07 413 0.23 485 1.15 557 3.42 632 1.83 709, 0,95 785 1.90 861 222 77 S 32.58 W 225 1`4 S 8 19 W 33 S 42.90 W 282 42 S 55.05 W 348 68 S 68.82 W 419 61 S 84,14 W 492 85 S 100.02 W 566 24 S 116.32 W 642 70 S 132.55 W 721 77 S 147.93 W 799 03 S 163.89 W 876 61 S 8 44 W 79 S 9 5 W 36 S 9 27 W 85 S 9 50 W 75 5 10 10 W 85 S 10 25 W 97 S 10 35 W 57 S 10 40 W 49 S 10 47 W 2000.00 1632 96 1502.96 52 11 S 12 33 W 954 66 2100 O0 1694 2200 O0 1757 2300 O0 1821 2400 O0 1885 2500 O0 1949 2600 O0 2015 2700 O0 2082 2800 O0 2149 2900 O0 2216 59 1564 59 51 39 S 13 26 W 1033 55 1627 98 1691 43 1755 47 1819 78 1885 28 1952 49 2019 37 2086 55 49 58 S 12 41 W 1110 98 50 13 S 12 37 W 1187 43 50 50 S 13 6 W 1264 47 49 13 S 12 50 W 1341 78 48 17 S 11 19 W 1415 28 48 11 S 11 58 W 1490 49 47 30 S 12 36 W 1564 37 48 35 S 10 6 W 1638 29 8`4 22 41 07 87 53 50 80 0.88 0.76 1014 2.28 1089 0.99 1164 0.95 1239 3.41 1314 0.61 1387 0,91 1461 0,86 1533 1.33 1606 937 59 S 180.65 W 954 83 S 10 54 W 32 S 198.36 W 1033 94 S 2t6.16 W 1111 59 S 232.75 W 1187 97 S 249.88 W 1264 72 S 267.45 W 1341 99 S 282.74 W 1416 16 S 297.74 W 1491 49 S 313.55 W 1565 35 S 328.30 W 1639 53 S 11 4 W 17 S 11 13 W 62 S 11 18 W 89 S 11 24 W 65 S 11 30 W 50 S 11 31W 19 S 11 3t W 22 S 11 33 W 55 S tl 33 W 3000.00 2282 16 2152.16 49 13 S 9 56 W 1714.13 3100.00 2346 89 2216.89 50 8 5 9 52 W 1790.33 3200.00 2410 22 2280.22 51 12 S 9 27 W 1867.71 3300.00 2472 42 2342.42 51 43 S 9 43 W 1946.01 3400.00 2535 47 2405.47 49 32 S 8 53 W 2023.62 3500.00 2600 91 2470.91 49 0 S 8 31 W 2099.22 3600.00 2666.36 2536.36 49 21 S 8 43 W 2174.81 3700.00 2731.23 2601.23 49 53 S 9 2 W 2250.90 3800.00 2794.88 2664.88 50 59 S 9 44 W 2328.02 3900.00 2857.69 2727,69 50 44 S 10 57 W 2405.83 1 01 1680.55 S 341.20 W 1714 83 S 11 29 W 31 1755.61 S 354.42 W 1791 79 1831.92 S 367.27 W 1868 16 1909.13 S 380.26 W 1946 69 1985.69 S 393.03 W 2024 18 2060.45 S 404.33 W 2099 65 2135.21 S 415.60 W 2175 36 2210.39 S 427.38 W 2251 48 2286.51 S 439.84 W 2328 03 S 11 25 W 37 S 11 20 W 64 S 11 16 W 21 S 11 12 W 75 S 11 6 W 29 S 11 1W 33 S 10 57 W 43 S 10 53 W 23 2363.03 S 453.96 W 2406.24 S 10 52 W COMPUTATION DATE: 1-AUG-91 PAGE 2 ARCO ALASKA INC. 1L - 24 KUPARUK RIVER NORTH SLOPE, ALASKA DATE OF SURVEY: 3-JUNE-1991 KELLY BUSH[NG ELEVATION: 130.00 FT ENGINEER: SCHWARTZ INTERPOLATED VALUES FOR EVEN 100 FEET OF MEASURED DEPTH TRUE SUB-SEA COURSE VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUTH DEPTH DEPTH DEPTH DEG MIN DEG MIN FEET DEG/IO0 FEET FEET FEET DEG MIN 4000.00 2921.39 2791 39 50 27 S 11 22 W 2482 89 4100.00 2984.95 2854 4200.00 3048.23 2918 4300.00 3111.62 2981 4400.00 3174.21 3044 4500.00 3235.35 3105 4600.00 3295.81 3165 4700.00 3355.62 3225 4800.00 3417.61 3287 4900.00 3484.09 3354 95 50 40 5 12 18 W 2560 23 50 38 S 10 33 W 2637 62 50 50 5 10 36 W 2714 21 51 48 5 10 58 W 2792 35 52 36 S 11 6 W 2871 81 53 7 5 11 14 W 2951 62 53 19 5 10 40 W 3031 61 49 37 S 10 8 W 3110 O5 44 77 75 86 49 62 O5 09 47 3 S 10 37 W 3184.74 0.64 2438 67 S 468.78 W 2483.32 S 10 53 W 0.69 2514 23 S 484.64 W 2560.52 S 10 55 W 1.46 2590 07 S 500.26 W 2637.94 S 10 56 W 0.67 2666 13 S 514.25 W 2715.28 S 10 55 W 1.27 2742 74 S 528.84 W 2793.26 S 10 55 W 0.28 2820 40 S 544.06 W 2872.40 S 10 55 W 0.66 2898 56 S 559.40 W 2952.04 5 10 55 W 1,07 2977.24 S 574.65 W 3032.19 S 10 55 W 2.94 3054.39 S 588,77 W 3110.62 S 10 55 W 1.97 3127.87 S 602.15 W 3185,30 S 10 54 W 5000.00 3552.81 3422.81 46 17 S 10 51 W 3257.37 5100.00 3622 83 3492.83 45 3 S 10 50 W 3328.75 5200.00 3693 35 3563.35 45 15 5 10 31 W 3399.64 5300.00 3763 08 3633.08 46 54 S 10 6 W 3471.31 5400.00 3829 39 3699.39 49 32 S 9 30 W 3546.15 5500.00 3893 55 3763.55 50 23 S 9 54 W 3622.85 5600.00 3957 53 3827.53 50 7 S 8 45 W 3699.70 5700.00 4021 69 3891.69 50 0 5 7 52 W 3776.38 5800.00 4084.90 3954.90 51 44 S 8 36 W 3853.82 5900.00 4146.37 4016.37 52 9 S 8 49 W 3932.68 1 22 3199.25 S .615 66 W 3257.95 S 10 54 W 22 3269.34 S 629 23 3339.02 S 642 78 3409.53 S 655 16 3483.30 S 667 50 3558.87 S 680 52 3634.73 5 693 09 3710.62 S 704 01 3787.35 S 715 29 3865.28 S 727 23 W 3329.34 S 10 54 W 28 W 3400.24 S 10 53 W 17 W 3471.91 S 10 53 W 76 W 3546.73 S 10 51 W 88 W 3623,42 S 10 50 W 21 W 3700,24 S 10 48 W 37 W 3776,88 S 10 45 W 12 W 3854.27 5 10 42 W 25 W 3933.10 S 10 39 W 6000.00 4207 98 4077 98 51 49 S 8 24 W 4011.43 6100 O0 4269 6200 6300 6400 6500 6600 6700 6800 6900 73 4139 O0 4331 32 4201 O0 4392 89 4262 O0 4454 13 4324 O0 4515 17 4385 O0 4575 95 4445 O0 4636.75 4506 O0 4700.05 4570 O0 4763.89 4633 73 52 0 S B 1 W 4090.06 32 51 57 S 7 32 W 4168.79 89 52 8 S 7 15 W 4247.52 13 52 20 S 6 53 W 4326.48 17 52 26 S 6 40 W 4405.58 95 52 44 S 6 17 W 4484.85 75 51 50 S 7 0 W 4564.09 05 50 16 S 8 7 W 4641.46 89 50 22 S 7 49 W 4718.39 0 34 3943.16 S 739 05 W 4011.82 S 10 37 W 0 40 4021.01 S 750 0 24 4099,08 S 760 0 50 4177.22 S 771 0 40 4255.68 S 780 0 46 4334.34 S 790 0 38 4413.24 S 799 3 84 4492.14 S 807 0.35 4568.82 S 818 0.38 4645.05 S 829 29 W 4090.41 S 10 34 W 90 W 4169.10 S 10 31 W 04 W 4247.78 S 10 27 W 76 W 4326.70 S 10 24 W 07 W 4405.76 S 10 20 W 02 W 4484.99 S 10 16 W 81 W 4564.19 S 10 12 W 37 W 4641.54 S 10 9 W 02 W 4718.45 S 10 7 W 7000 O0 4827.73 4697 73 50 8 S 7 31 W 4795 30 7100 7200 7300 7400 7500 7600 7700 7800 7900 O0 4893.16 4763 O0 4959.24 4829 O0 5025.14 4895 O0 5091.17 4961 O0 5157.31 5027 O0 5223.47 5093 O0 5289.81 5159 O0 5355.99 5225 O0 5421.84 5291 16 48 34 S 8 22 W 4870 24 48 45 S 7 57 W 4945 14 48 45 S 7 43 W 5021 17 48 40 S 7 27 W 5096 31 48 35 S 7 11 W 5171 ,47 48 32 S 6 58 W 5245 81 48 25 S 6 35 W 5320 99 48 39 S 6 11 W 5395 84 49 5 S 6 44 W 5470 88 91 07 11 O5 95 67 5O 61 1.37 4721.35 S 839 23 W 4795.35 S 10 5 W 0.47 4796.22 S 849 0.29 4870.52 S 860 0.59 4945.03 S 870 0.27 5019.48 S 880 0.12 5093.87 S 890 0.37 5168.29 S 899 0.43 5242.59 S 908 0.40 5317,09 S 916 0.25 5391.89 S 924 80 W 4870.92 S 10 3 W 41 W 4945.94 S 10 ~ W 62 W 5021.09 S 9 59 W 53 W 5096.12 S 9 57 W 07 W 5171.05 S 9 55 W 34 W 5245.95 S 9 52 W 18 W 5320.67 S 9 50 W 48 W 5395.50 S 9 47 W 79 W 5470.62 S 9 44 W COMPUTATION DATE: 1-AUG-gl PAGE 3 ARCO ALASKA INC. 1L - 24 KUPARUK RIVER NORTH SLOPE, ALASKA DATE OF SURVEY: 3-JUNE-1991 KELLY BUSHING ELEVATION: 130.00 FT ENGINEER: SCHWARTZ INTERPOLATED VALUES FOR EVEN 100 FEET OF MEASURED DEPTH TRUE SUB-SEA COURSE VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUTH DEPTH DEPTH DEPTH DEG MIN DEG MIN FEET DEG/IO0 FEET FEET FEET DEG MIN 8000,00 5487 43 5357,43 48 56 S 6 26 W 5545,99 8100,00 5553 35 5423,35 48 33 S 6 7 W 5621.04 8200,00 5619 68 5489,68 48 25 S 5 47 W 5695.71 8300.00 5685 37 5555,37 49 43 S 5 39 W 5770,91 8400,00 5749 97 5619,97 49 43 S 5 19 W 5847,02 8500,00 5814 61 5684,6t 49 48 S 4 55 W 5923.06 8600,00 5879 06 5749,06 49 56 S 4 47 W 5999,22 8700,00 5943,25 5813.25 50 11 S 5 6 W 6075,63 8800,00 6007,12 5877,12 50 23 S 4 57 W 6152.31 8900,00 6070.73 5940,73 50 35 S 5 0 W 6229,20 0,38 5466.88 S 933,46 W 5546 O0 S 9 41 W 0,59 5541 0.56 5616 1 21 5691 0 32 5767 0 34 5843 0 65 5919 0 22 5995 0 26 6072 0 28 6149 62 S 941,69 W 5621 06 S 949.44 W 5695 08 S 956,90 W 5770 07 S 964 20 W 5847 06 S 971 O0 W 5923 25 S 977 37 W 5999 64 S 984 07 W 6075 30 S 990 75 W 6152 17 S 997 45 W 6229 06 S 9 39 W 75 S 9 36 W 97 S 9 33 W 11 S 9 29 W 19 S 9 26 W 40 S 9 23 W 86 S 9 19 W 59 S 9 16 W 54 S 9 13 W 9000.00 6134,24 6004.24 50 33 S 4 55 W 6306.15 9100,00 6197,68 6067,68 50 50 S 4 58 W 6383.17 9200,00 6260,67 6130,67 50 58 S 5 3 W 6460.60 9241,00 6286.49 6156.49 50 58 S 5 3 W 6492,34 0.87 6226.12 S 1004.11 W 6306.57 S 9 10 W 0.76 6303.14 S 1010.69 W 6383.66 S 9 7 W 0.00 6380.55 5 1017,43 W 6461.16 S 9 4 W 0.00 6412.28 S 1020.24 W 6492.93 S 9 2 W COMPUTATION DATE: 1-AUG-91 PAGE 4 ARCO ALASKA INC. 1L - 24 KUPARUK RIVER NORTH SLOPE, ALASKA DATE OF SURVEY: 3-JUNE-1991 KELLY BUSHING ELEVATION: 130.00 FT ENGINEER: SCHWARTZ INTERPOLATED VALUES FOR EVEN 1000 FEET OF MEASURED DEPTH TRUE SUB-SEA COURSE MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH DEPTH DEPTH DEPTH DEG MIN DEG MIN VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUTH FEET DEG/IO0 FEET FEET FEET DEG 0.00 1000.00 955 2000.00 1632 3000.00 2282 4000.00 2921 5000.00 3552 6000.00 4207 7000.00 4827 8000,00 5487 9000.00 6134 0 O0 -130 O0 56 825 96 1502 16 2152 39 2791 81 3422 98 4077 73 4697 43 5357 24 6004 0 0 56 32 47 96 52 11 16 49 13 39 50 27 81 46 17 98 51 49 73 50 8 43 48 56 24 50 33 N 0 0 E S 10 12 W 225 S 12 33 W 954 S 9 56 W 1714 5 11 22 W 2482 S 10 51 W 3257 S 8 24 W 4011 S 7 31 W 4795 S 6 26 W 5545 S 4 55 W 6306 0 O0 O6 66 11 89 37 43 30 99 15 0 O0 4 39 0 88 1 01 0 64 1 22 0 34 1 37 0 38 0 87 0.00 N 222 77 S 32 937 59 S 180 t680 55 S 341 2438 67 S 468 3199 25 S 615 3943 16 S 739 4721.35 S 839 5466.88 S 933 6226.12 S 1004 0 O0 E 0 O0 N 0 0 E 58 W 225 14 S 8 19 W 65 W 954 83 S 10 54 W 20 W 1714 83 S 11 29 W 78 W 2483 32 S 10 53 W 66 W 3257 95 S 10 54 W 05 W 4011 82 S 10 37 W 23 W 4795 35 S 10 5 W 46 W 5546.00 S 9 41 W 11 W 6306.57 S 9 10 W 9241.00 6286.49 6156.49 50 58 S 5 3 W 6492,34 0.00 6412.28 S 1020.24 W 6492.93 S 9 2 W ARCO ALASKA INC. 1L - 24 KUPARUK RIVER NORTH SLOPE, ALASKA COMPUTATION DATE: 1-AUG-91 PAGE 5 DATE OF SURVEY: 3-JUNE-1991 KELLY BUSHING ELEVATION: 130.00 FT ENGINEER: SCHWARTZ INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH TRUE SUB-SEA COURSE VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ, DEPARTURE MEASURED VERTICAL VERTICAL DEVIATION AZIMUT~ SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUT~ DEPTH DEPTH DEPTH DEG MIN DEG MIN FEET DEG/IO0 FEET FEET FEET DEG MIN 0 O0 130 O0 130.00 0 230 O0 230.00 100 330 05 330.00 200 43069 430.00 300 533 06 530.00 400 638.61 630.00 500 746,44 730,00 600 856,09 830,00 700 969,85 930,00 800 0,00 -130 O0 0 0 N 0 0 E O0 0 14 S 22 52 E 0 O0 0 47 S 5 49 E 0 O0 2 56 S 6 47 W 3 O0 9 2 S 7 42 W 14 O0 15 38 S 6 38 W 36 O0 20 55 S 6 25 W 69 O0 22 59 S 8 29 W 110 O0 25 35 S 10 1 W 154 O0 31 22 S 10 14 W 209 0 O0 18 84 74 56 15 73 O2 96 07 0 O0 0 3O 1 34 6 22 5 48 5 3O 2 85 2 27 3 88 501 0,00 N 0.00 E 0,00 N 0 0 E O, 22 S O. 21 E O. 30 S 42 52 E 0.93 S 0.43 E 1 ,03 S 24 49 E 3.84 S 0.27 E 3.85 S 4 4 E 14,56 S 1,24 W 14,61 S 4 52 W 36,02 S 3,89 W 36,23 S 6 10 W 69,46 S 7,56 W 69,87 S 6 13 W 109.43 S 12.81 W 110.18 S 6 41 W 153.79 S 20,05 W 155.10 S 7 26 W 207.03 S 29.74 W 209. 16 S 8 10 W 1090 69 1030,00 900,00 37 20 S 10 31 W 276 82 1224 1369 1517 1677 1835 1995 2156 2312 2469 86 1130,00 1000,00 44 24 S 11 3 W 366 11 1230,00 1100,00 47 46 S 12 9 W 469 89 1330.00 1200.00 48 4 S 12 34 W 580 37 1430,00 1300,00 52 17 S 11 41 W .704 96 1530,00 1400,00 50 8 S 11 55 W 827 17 1630,00 1500,00 52 11 S 12 31 W 950 73 1730,00 1600,00 51 1 S 13 21 W 1077 53 1830,00 1700,00 50 20 S 12 39 W 1196 98 1930,00 1800,00 49 55 S 13 22 W 1318 10 97 O2 O8 O9 85 52 84 27 7.36 273.69 S 41.86 W 276.87 S 8 42 W 1.37 361.44 S 58.35 W 366.12 5 9 10 W 0.70 463.23 S 79.31 W 469.97 S 9 43 W 2.83 570.83 S 102.91 W 580.04 S 10 13 W 1.73 692.23 5 128.97 W 704.14 5 10 33 W 0.87 812.81 S 153.54 W 827.19 S 10 42 W 0.84 933.86 S 179.82 W 951.02 5 10 54 W 2.41 1057.43 S 208.66 W 1077.82 S 11 10 W 0,92 1173.99 S 234,85 W 1197.25 S 11 19 W 2,15 1292,47 S 262,28 W 1318.82 S 11 28 W 2621 38 2030.00 1900 O0 48 22 S 11 23 W 1431 83 2771 13 2130 O0 2000 O0 47 32 S 12 33 W 1543 2920 62 2230 O0 2100 O0 48 42 S 9 50 W 1654 3073 72 2330 O0 2200 O0 49 52 S 10 2 W 1770 3231 66 2430 O0 2300 O0 5t 28 S 9 30 W 1892 3391 54 2530 O0 2400 O0 49 47 S 9 1 W 2017 3544 35 2630 O0 2500 O0 49 3 S 8 33 W 2132 3698 09 2730 O0 2600,00 49 52 S 9 2 W 2249 3855,98 2830,00 2700,00 51 13 S 10 37 W 2371 4013,52 2930,00 2800,00 50 28 S 11 30 W 2493 23 27 2O 43 17 69 44 61 31 0.38 1403.64 S 285,87 W 1432,46 S 11 31 W 0 90 1512.71 S 308.92 W 1543,93 5 11 33 W 0 47 1621,58 S 330,99 W 1655.02 5 11 32 W 1 10 1735,78 S 350,95 W 1770,91 S 11 26 W 0 84 1856.30 S 371,33 W 1893 08 S 1t 19 W 3 69 1979.32 S 392.03 W 2017 77 S 11 12 W 0 46 2093,56 S 409,29 W 2133 19 S 11 4 W 1 30 2208.95 S 427,15 W 2249 87 S 10 57 W 1 24 2329,41 S 447,56 W 2372 02 5 10 53 W 0.75 2448,89 S 470,86 W 2493 75 S 10 53 W 4171,22 3030,00 2900 O0 50 46 S 11 15 W 2615 17 4329,16 3130,00 3000 4491,20 3230,00 3100 4657,11 3330,00 3200 4819,02 3430,00 3300 4966,93 3530,00 3400 5110,15 3630,00 3500 5252,16 3730,00 3600 5400,94 3830,00 3700 5557,04 3930,00 3800 O0 51 0 S 10 44 W 2737 O0 52 36 S 11 7 W 2864 O0 53 18 S 10 57 W 2997 O0 49 5 S 10 9 W 3124 O0 46 29 S 10 45 W 3233 O0 45 3 S 10 45 W 3335 O0 45 35 S 10 24 W 3436 O0 49 33 S 9 31 W 3546 O0 50 11 5 9 5 W 3666 40 87 23 48 43 93 75 87 72 2,38 2568 20 S 496.03 W 2615 66 5 10 56 W 0.72 2688 38 S 518.43 W 2737 0,34 2813 54 S 542,72 W 2865 0.97 2943 45 S 568.22 W 2997 2,32 3068 59 S 591.31 W 3125 0.10 3175 72 S 611,18 W 3234 1,03 3276 40 S 630,57 W 3336 1.46 3375,52 S 649,02 W 3437 1,15 3484,01 S 667,87 W 3547 0,77 3602,14 S 688,09 W 3667 91 S 10 55 W 40 S 10 55 W 79 S 10 56 W 05 S 10 54 W O0 S 10 54 W 52 S 10 54 W 35 S 10 53 W 45 S 10 51W 27 S 10 49 W COMPUTATION DATE: 1-AUG-91 PAGE 6 ARCO ALASKA INC. 1L - 24 KUPARUK RIVER NORTH SLOPE. ALASKA DATE OF SURVEY: 3-JUNE-1991 KELLY BUSHING ELEVATION: 130.00 FT ENGINEER: SCHWARTZ INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH TRUE SUB-SEA COURSE VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUTH DEPTH DEPTH DEPTH DEG MIN DEG MIN FEET DEG/IO0 FEET FEET FEET DEG 5712 96 4030.00 3900.00 50 7 S 7 46 W 3786.32 5873 6035 6197 6360 6524 6689 6846 7003 7155 31 4130.00 4000.00 52 10 5 8 54 W 3911.61 61 4230.00 4100.00 51 48 S 8 17 W 4039,40 86 4330.00 4200.00 51 57 S 7 33 W 4167,11 56 4430 O0 4300.00 52 15 S 7 2 W 4295.32 35 4530 O0 4400.00 52 29 S 6 35 W 4424.86 09 4630 00 4500.00 52 10 S 6 40 W 4555,53 89 4730,00 4600.00 50 21 S 7 58 W 4677.52 53 4830 00 4700.00 50 3 S 7 33 W 4798.00 70 4930 O0 4800.00 48 39 S 8 6 W 4912.64 1.56 3720 47 S 705 72 W 3786.81 S 10 44 W 0.18 3844 0.28 3970 0.23 4097 0 36 4224 0 39 4353 3 39 4483 0 21 4604 1 70 4724 0 44 4837 46 S 724 85 S 743 41S 760 70 S 776 52 S 792 63 S 806 55 S 823 02 S 839 56 S 855 01 W 3912 04 S 10 40 W 11W 4039 68 W 4167 98 W 4295 30 W 4425 75 W 4555 41W 4677 59 W 4798 77 W 4912 78 S 10 36 W 43 S 10 31W 56 S 10 25 W 03 S 10 19 W 63 5 10 12 W 59 S 10 8 W 05 S 10 5 W 67 5 10 2 W 7307 36 5030 O0 4900 O0 48 44 S 7 42 W 5026.59 7458 72 5130 00 5000 O0 48 34 S 7 17 W 5140.12 7609 85 5230 O0 5100 O0 48 30 S 6 56 W 5253.32 7760 67 5330 O0 5200 O0 48 36 S 6 19 W 5366.04 7912 44 5430 O0 5300 O0 49 4 S 6 44 W 5480.00 8064 67 5530 O0 5400 O0 48 43 S 6 15 W 5594.57 8215 56 5630 O0 5500.00 48 27 S 5 44 W 5707.33 8369 11 5730 O0 5600.00 49 45 S 5 26 W 5823,52 8523 85 5830 O0 5700.00 49 50 S 4 50 W 5941.21 8679.31 5930.00 5800.00 50 9 S 5 7 W 6059.80 0 48 4950 51 S 871 36 W 5026.62 S 9 59 W 0 15 5063 16 S 886 0 37 5175 61 S 900 0 35 5287 75 S 913 0 24 5401 22 S 925 0 44 5515 26 S 938 0 77 5627 65 S 950 0 28 5743 60 S 961 0.22 5861.22 S 972 0,12 5979.82 S 982 18 W 5140.13 S 9 56 W 23 W 5253.32 S 9 52 W 27 W 5366.04 S 9 48 W 88 W 5480.01 S 9 44 W 83 W 5594.59 S 9 40 W 60 W 5707.37 5 9 35 W 99 W 5823.60 S 9 30 W 54 W 5941.35 S 9 25 W 66 W 6060.02 S 9 20 W 8835,92 6030.00 5900.00 50 28 S 4 59 W 6179,90 8993.32 6130.00 6000.00 50 34 S 4 55 W 6301.02 9151.30 6230.00 6100.00 50 58 S 5 3 W 6422.90 9241.00 6286.49 6156.49 50 58 S 5 3 W 6492.34 0.27 6099.88 S 993.14 W 6180.20 S 9 15 W 0.76 6220.98 S 1003.67 W 6301.42 S 9 10 W 0.00 6342.86 S 1014.10 W 6423.42 S 9 5 W 0.00 6412.28 S 1020.24 W 6492.93 S 9 2 W COMPUTATION DATE: 1-AUG-91 PAGE 7 ARCO ALASKA INC. 1L - 24 KUPARUK RIVER NORTH SLOPE, ALASKA MARKER 9 5/8" CASING TOP KUPARUK C BASE KUPARUK C TOP KUPARUK A BASE KUPARUK A LAST GCT READING PBTD 7" CASING TD DATE OF SURVEY: 3-JUNE-1991 KELLY BUSHING ELEVATION: 130.00 FT ENGINEER: SCHWARTZ INTERPOLATED VALUES FOR CHOSEN HORIZONS SURFACE LOCATION = 567' FNL & 143' FEL, SEC31 T!lN RIOE MEASURED DEPTH BELOW KB TVD FROM KB SUB-SEA RECTANGULAR COORDINATES NORTH/SOUTH EAST/WEST 5081.00 8735.00 8785,00 8890.00 9036.00 9115.49 9155.00 9241,00 9241.00 3609 43 5965 64 5997 55 6064 38 6157 13 6207 46 6232 33 6286 49 6286 49 3479.43 5835.64 5867.55 5934.38 6027,13 6077.46 6102.33 6156.49 6156.49 3256 11 S 6022 44 S 6060 79 S 6141 47 S 6253 81 S 6315 11S 6345 73 S 6412 28 S 6412 28 S 626.68 W 986.43 W 989.75 W 996.78 W 1006.49 W 1011.74 W 1014.36 W 1020.24 w 1020.24 W COMPUTATION DATE: 1-AUG-91 PAGE 8 ARCO ALASKA INC. 1L - 24 KUPARUK RIVER NORTH SLOPE, ALASKA MARKER 9 5/8" CASING TOP KUPARUK C BASE KUPARUK C TOP KUPARUK A BASE KUPARUK A LAST GCT READ[NG PBTD 7" CASING TD DATE OF SURVEY: 3-JUNE-lggl KELLY BUSHING ELEVATION: 130.00 FT ENGINEER: SCHWARTZ ************ STRATIGRAPHIC SUMMARY SURFACE LOCATION = 567' FNL & 143' FEL, SEC31 TllN RIOE MEASURED DEPTH TVD BELOW KB FROM KB SUB-SEA RECTANGULAR COORDINATES NORTH/SOUTH EAST/WEST 5081.00 3609.43 3479.43 8735.00 5965.64 5835.64 8785.00 5997.55 5867.55 8890.00 6064.38 5934.38 9036.00 6157.13 6027.13 9115.49 6207.46 6077.46 9155.00 6232.33 6102.33 9241.00 6286.49 6156.49 9241.00 6286.49 6156.49 3256 11 S 6022 44 S 6O6O 79 S 6141 47 S 6253 81S 6315 11S 6345 73 S 6412 28 S 6412.28 S 626.68 986.43 989.75 996.78 1006.49 1011.74 1014.36 1020.24 1020.24 FINAL WELL LOCATION AT TD: TRUE SUB-SEA MEASURED VERTICAL VERTICAL DEPTH DEPTH DEPTH 9241.00 6286.49 6156.49 HORIZONTAL DEPARTURE DISTANCE AZIMUTH FEET DEG MIN 6492.93 S 9 2 W DIRECTIONAL SURVEY COMPANY FIILO WIU. COUNTRY RUN D~T! I.OQGID [)~rTH UNIT ARCO AL.A~KA INC. KUPARUK RIVER 1L-24 USA ONE O3 - JUN - FEET 91 mmm ~ .~-~ m m~ _?~ mmm .... mmmm fm4mm WELL: 1[.-24 ~ (567' FWL, 143' FEL, SEC 31, T11N, R10E, ) dORIZONTAL PROJECTION I WELL: 1L:24 (567' FWL, 143' FEL, SEC 31, T11N, R10E, ) VERTICAL PROJECTION -4000 . -&~O0 0 0 &N200 4000 ~ BO00 10000 AOGCC GEOLOGICAL h4ATERIALS INVENTORY LIST PERMIT fl c~.t -.....~ WELL NAME COMPLETION DATE - ~ / )~ /~tl CO, CONTACT . . check off or listdata as it is"receiv~d.*liSt received date for 407. if nOt reqSred list as NFl cored int~w~s core analysis ~ , d~ ditch intcwals , digital daW Il I IL~II II I I Ill I Il IIll I I I IL I I I I Il I I Il Ill I Il I IIIII IIII ~ ~1~ I L I I II I II I II I IIIIIN III I I] I I IIII I ' - - I I I I I J I I I . IIII . ~1. I I I I II I,1 LOG TYPE RUN INTERVALS SCALE ...... ,, . .o, ,, ttoth..--.. t ootl .......... \,, I i i i i ii ii i iiii i i i i iiiillll i i i i i,llll I i i i ~ , t . i i J I i i ii i iii i ii i i,, ,mi i III II ] I 71 , i Jill III1'1 III JJJ , i . i ........ i ,lJ IU i± . Il ,, i ,1 ii, ,, _ _~ _ . .J JJl jill i 1 41 ._ .... 161 i~/ i ii i i ii i i ii i iii i t i i 17] ii il I I III ii I i iii I I i ii ii i i IL III 1~1 ": ,,!,,..! .................... ............... i ii i i iii ii i ii III I I II i STATE OF ALASKA A~ OIL AND GAS CONSERVATION COMMI,~olON REPORT OF SUNDRY WELL OPERATIONS 1. Operations Performed: Operation Shutdown __ Stimulate m Pull tubing Alter casing Repair well 2. Name of Operator ~ 5. Type of Well: Development X ARCO Alaska, Inc. Exploratory _ 3. Address Stratigraphic _ P. O. Box 100360, Anchorage, AK 99510 Service _ Plugging , Perforate X Other 6. Datum elevation (DF or KB) 130' RKB 7. Unit or Property name Kuparuk River Unit feet 4. Location of well at surface 567' FNL, 143' FEL, Sec. 31, T11N, R10E, UM At top of productive interval 1309' FNL, 1129' FEL, Sec. 6, T10N, R10E, UM At effective depth 1632' FNL, 1257' FEL, Sec. 6, T10N, R10E, UM At total depth 1699' FNL, 1263' FEL, Sec. 6, T10N~ R10E, UM 12. Present well condition summary Total Depth: measured 9 2 41 ' feet true vertical 6286' feet Plugs (measured) 8. Well number 1L-24 9. Permit number/approval number 91-66 10. APl number 50-029-22170 11. Field/Pool Kuparuk River Oil Pool Effective depth: measured 91 55' feet Junk (measured) true vertical 6232' feet Casing Length Size Cemented Structural Conductor 1 22' 1 6" 235 Sx AS I Surface 5081' 9 5/8" 750 Sx Type E & Intermediate 550 Sx Class G Production 9241' 7" 250 Sx Class G Prem. Liner Perforation depth: measured 8735'-8782',8920'-8948',901 0'-9028' true vertical 5965'-5995',6084'-61 01 ',61 40'-61 52' Tubing (size, grade, and measured depth) 3 1/2" 9.3#, J-55, 8655' Packers and SSSV (type and measured depth) SSSV: Camco TRDP-4A-SSSV, 1817', Packer: TIW HM-1, 8601' Measured depth 122' 5081' 9241' True vertical depth 122' 3609' 6286' RECEIVED 13. Stimulation or cement squeeze summary Perforated "C" Sand @ 6 SPF on 8/20/91 Intervals treated (measured) 8735'-8782' Treatment description including volumes used and final pressure N/A OCT 2 1 1991 Alaska 0il & Gas Cons. c0mm'ts$~0t~ ;Anchorage 14. Representative Daily Average productiQrl or Injection Data OiI-Bbl Gas-Md Water-Bbl Casing Pressure Tubing Pressure Prior to well operation Subsequent to operation 148 1 1 - 0 - 0 - 190 1600~' ....150," 30 1600 200 15. Attachments Copies of Logs and Surveys run Daily Report of Well Operations X 16. Status of well classification as: Water Injector Oil X Gas Suspended Service 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed Title Form 10'-404 Rev-09/12/90 Date SUBMIT IN DUPLICATE ARCO Alaska, Inc,~ ~ Sz, bsidiar7 of Atlantic Richfield Compan~ ~ WELL SERVICE REPORT .WEbL PBDT NTRACTOR REMARKS FIELD- DISTRICT- STATE OPERATION AT REPORT TIME JDAYS DATE F-I CHECK THIS BLOCK IF SUMMARY CONTINUED ON BACK Weather 1 Temp' I Chill Fact°r 1 Visibility IWlnd Vel'Report "F OF miles ARCO Alaska, Inc. Date: August 16, 1991 Transmittal #: 8203 RETURN TO: ARCO Alaska, Inc. Attn: Maria Trevithick Kuparuk Records Clerk ATO-1119 P.O. Box 100360 Anchorage, AK 99510-0360 Transmitted here with are the following items. Please acknowledge receipt and return one signed copy of this transmittal. 1 L- 1 3 Sub-Surface Directional 4- 1 9- 91 74766 Survey 1L-23 Sub-Surface Directional 6-3-91 74764 Survey 1L-24 Sub-Surface Directional 6-3o91 74763 Survey 1 R-1 9 Sub-Surface Directional 7-4- 9 1 74767 Survey Receipt Acknowledged: D&M State of Alaska Date: RECEIVED Naska 011 & Gas Cons. Commission Anchorage ARCO Alaska,/nc. Date: June 14, 1991 1L-23 1L.24 47/-~ ~ L-~5 ~"1 L '25 ARCO Alaska,/nc. A TTN: Maria Trevithick ~'~a-r~k1109Perati°ns Fife Clerk .P.O. ~ox 10036 Anchorage, AK 0 · 99510.0360 Transmitted here With are return one signed COpy of the 'following Case(/ ~'ffP~ 1A-20 this transmittal. Hole items. 1 A - 20 Cement ~9ond Log ,/ ~/'~ ,3,, 1 l., 23 Cement Evaluat. C_ ement Eva, ..... ~on & Thick o 66 ~ Cement ,~ '~,ua~on Log ~,. ness/' ' 9 1 ~Ond Lz~ ~. 6-6.9 1 C_ ement Eval- -.? v~ 6.2.9 1 6-2.91 6-4.91 Log t.; ' 6-4.91 ..._ ' 6'4-91 ReceiptAcknowledge: ~~. Drilling . ' Date. State of A~aska(~sepia) Transmittal #: 8133 Please acknowledge receipt and 90-2274 100-2270 8850-10237 8850-10237 7500-9141 7500-9143 7800-9088 7800-9065 RECEIVED JUN 1 7 1991 Alaska 011 & 6as Cons. Commission Anchorage ARCO Alaska, Inc. Date: June 14, 1991 Transmittal #: 8129 RETURN TO: ARCO Alaska, Inc. Attn: Maria Trevithick Kuparuk Operations File Clerk ATe-1119 P.O. Box 100360 Anchorage, AK 99510-0360 Transmitted here with are the following items. Please acknowledge receipt and return one signed copy of this transmittal. 1L-24 Receipt LIS Tape and Listing 5 - 1 9 - 9 1 4 9 6 5.5 - 9243.5 Acknowledged' - ....... Date' - ......... DISTRIBUTION: Lynn Goettinger State of Alaska ARCO Alaska, Inc. Date: May 31, 1991 Transmittal #: 8115 RETURN TO: ARCO Alaska, Inc. Attn: Maria Trevithick Kuparuk Operations File Clerk ATO-1119 P.O. Box 100360 Anchorage, AK 99510-0360 Transmitted here with are the following Open hole items. Please acknowledge receipt and return one signed copy of this transmittal. 1 L-24 1L-24 Receipt CCN 5-19-22-91 5081-9241 CDR 5-19-22-91 5081-9241 Acknowledged' ~--~~-- Date' - ......... DISTRIBUTION: D&M Drilling Franzen Vendor Package(Johnston) NSK State of Alaska(+Sepia) RECEIVED JUN 0 q 1~1 Alaska 0il & 0;~s O~ns. L;ui~missiol3 Anchorage ALASKA OIL AND GAS CONSERVATION COMMISSION May 10, 1991 WALTER J. HICKEL, GOVERNOR 3001 PORCUPINE DRIVE ANCHORAGE, ALASKA 99501-3192 PHONE: (907) 279-1433 TELECOPY: (907) 276-7542 A. W. McBride Area Drilling Engineer ARCO Alaska, Inc. P. O. Box 100360 Anchorage, AK 99510-0360 Re: Well No. Kuparuk River Unit 1L-24 ARCO Alaska, Inc. Permit No. 91-66 Sur. Loc. 567'FNL, 143'FEL, Sec. 31, TllN, R10E, UM Btmhole Loc. 1739'FNL, 1259'FEL, Sec. 6, T10N, R10E, UM Dear Mr. McBride: Enclosed is the approved application for permit to drill the above referenced well. The permit to drill does not exempt you from obtaining additional permits required by law from other governmental agencies, and does not authorize conducting drilling operations until all other required permitting determinations are made. The Commission will advise you of those BOPE test that it wishes to witness. ~airman Alaska Oil d as Conservation Commission BY ORDER OF THE COMMISSION dlf/Enclosures cc: Department of Fish & Game, Habitat Section w/o encl. Department of Environmental Conservation w/o encl. STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION PERMIT TO DRILL 20 AAC 25.005 la. Type of Work Drill [] Redrill E]I lb. Type el Well Exploratory E] Stratigraphic Test E] Development Oil [] Re-Entry r-] Deepen [~I Service E] Development Gas E] single zone ~, Multiple Zone r-] 2.. Name of Operator 5. Datum Elevation (DF or KB) 10. Field and Pool ARCO Alaska, Inc. RKB 130'~ Pad 87' GL feet Kuparuk River Field 3. Address 6. Property Designation Kuparuk River Oil Pool P. O. Box 100360, Anchorage, AK 99510-0360 ADL 25664, ALK 473 4. Location of well at surface 7. Unit or property Name 11. Type Bond (see 20 AAC 25.025) 567' FNL, 143' FEL, Sec. 31, T11N, R10E, UM Kuparuk River Unit Statewide At top of productive interval (@ TARGET ) 8. Well number Number 1,310' FNL, 1,185' FEL, Sec. 6, T10N, R10E, UM 1L-24 #UG30610 At total depth 9. Approximate spud date Amount 1,739' FNL, 1,259' FEL, Sec. 6, T10N, R10E, UM 5/13/91 $200,000 12. Distance to nearest 13. Distance to nearest well 14. Number of acres in property 15. Proposed depth (MD and TVD) property line 1L-23 9,387' MD 1,739' @ TD feet 30' at SURFACE feet 2501 6,308' TVD feet 16. To be completed for deviated wells 17. Anticipated pressure (see 20 AAC 25.035(e)(2)) Kickoff depth 300 feet Maximum hole angle 52° Maximum surface 2125 psig At total depth (TVD) 31 00 psig 18. Casing program Settinc~ Depth size Specifications Top Bottom Quantity of cement Hole Casin~! Weicjht Grade Couplin~t Length IVl) TVD kO TVD (include stage data1 24" 16" 62.5# H-40 Weld 80' 43' 43' 123' 123' +200 CF 12.25'' 9.625" 36.0# J-55 BTC 4,906' 43' 43' 4,949' 3,590' 750 Sx AS III & HF-ERW 550 Sx Class G 8.5" 7" 26.0# J-55 BTC 9,344' 43' 43' 9~387' 6r308' 200SxClassG HF-ERW Top 500' above Kuparuk 19. To be completed for Redrill, Re-entry, and Deepen Operations. Present well condition summary Total depth: measured feet Plugs (measured) true vertical feet Effective depth: measured feet Junk (measured) true vertical feet Casing Length Size Cemented Measured depth True Vertical depth Structural Conductor Surface Intermediate Liner Perforation depth: measured true vertical 20. Attachments Filing f~e [~ Property plat BI aOPSketch ~] Diverter Sketch Drilling fluid program ~[' Time vs depth plot r"] Refraction analysis 21. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed ~'~ ~...'~~/,/~¢~//~,/,.~,,,~t~ Title Area Drillin, Engineer Date ,~/~/¢/ Commission Use Only Permit Number IAPI number IApprova/date ISee cover letter for '~/~--.~ 50,-~ ~-- '~'"' ~ ~ / 74:~ 0 ~) / 1 0 / 9 ]- other recluirements Conditions of approval Samples required E] Yes '~ No Mud log required r"] Yes ~ .o Hydrogen sulfide measures Yes ~ No Directional survey required Yes No Required working pressure for DOPE [] 2M [~ 3M E] 5M E] 10M E] 15M Other: ---- by order of Approve , Commissioner the commission Date 2O0 150 I I 100 i 5O 0 50 ]00 I I I 150 100 5O 3 5O lO0 150 2OO 25O mm mm mm · ! m 100 4300 ! / / ! I 200 / ! ! / / I 150 4100 / / / / / / / 7'1 / / / / / 1 O0 2300 I 100 2500 21oe' / / ," 900 I 700 900 I I I I i r 1100~ I I i ! I I $0 1500 I I - _ 1 300 ~ / 1700 1900 2100 I I I i I 0 50 100 150 100 5O 5O 100 150 2O0 250 ARCO ALASKA, ][nC. Structure ' Pod 1L Well · 24 Field · Kuporuk River Unit Location · North Slope, Alaska o o · ' 400 _ -6 800 - o _ 120o- _ Q_ - 2000- 0 - 0 2~6o- - - 5200 - - I reQted by ; jones For: T BtLIJNGSLEY ore plotted : 8-Moy--91 Plot Reference is 24- version t3. oordinotes ore in feet reference slot ~24. ,c 2j2T..E2 s ZNEASTMAN S 9 DEG 49 MIN W 6112' (TO TARGET) RKB ELEVATION: 150' KOP 'rVD=500 TMD=500 DEP=O 5.00 9.00 15.00 BUILD 3 DEG/IO0' 21.00 27.00 5.3.00 8/ PERMAFROST TVD=1480 TM0=1572 OEP=408 59.00 45.00 51.00 EOC TVD=ISIO TMD=2042 OEP=741 TARGET LOCATION: [ 1.510' FNL 1185' FEL SEC. 6, TION, RIOE T/ UGNU SNOS W0=2310 TMD=2858 DEP=1386 T/ W SAK SNDS TVD=2910TMO=3838 DEP=2161 B/ W SAKSNDS TVD=3390 TMD=4622 DEP=2781 9 5/8"CSG PT TVD=3590 TMD=4949 DEP=3039 K-lO ~V0=3815 TMD=5316 DEP=5350 AVERAGE ANGLE 52 DEG 15 MIN K-5 TVD=5140 TMD=74-80 DEP=5041 TARGET TVD--5970 TM0-8836 0EP-6112 SOUTH 6O23 · WEST 1042 SURFACE LOCATION: 567' FNL, 145' FEL SEC. 51, T11N~ RIOE <-- West ~,., :=.~ 1200 800 400 0 I I I I I I I I 0 4OO 80O 1200 _ -1604) _ -2000 _ -24O0 _ -2800 - -,$200 $$00 -4O0O _ _ -4800 _ -5200 - L5500 - -6400 .6800 TD LOCATION: 1739' FNL, 1259' ItEL SEC. 6~ TION~ RIOE i i i i i i o 400 8oo 1200 Scale 1 ' 200.00 TARGET - T/ ZONE C TVD=5970 TMD=8856 DEP=6112 T/ ZONE A TVD=6085TMD=9024 OEP=6261 %~. B/ KUP SNDS TVD=6185 TMD=9187 DEP=6390 TD / LOGGING PT Tv'D=6508 TMD=9387 DEP=6548 i i i i i i i i t i i i i i i i i i i i i i i i i I i 1~0o 2oo0 24o0 28o0 3200 3~o ' 4o00 4400 4800 5200 5~00 8000 s4oo ssoo Verticol Section on 189,82 ozimufh with reference 0.00 N, 0,00 E from slot #24 I I ¥ ,.JPARUK RIVER UNI', 20" DIVERTER SCHEMATIC 5 HCR \ 6 4 3 DO NOT SHUT IN WELL UNDER ANY CIRCUMSTANCES MAINTENANCE & OPERATION UPON INITIAL INSTALLATION, CLOSE PREVENTER AND VERIFY THAT VALVE OPENS PROPERLY. CLOSE ANNULAR PREVENTER IN THE EVENT THAT AN INFLUX OF WELLBORE FLUIDS OR GAS IS DETECTED. OPEN APPROPRIATE VALVE TO ACHIEVE DOWNWIND DIVERSION. ARCO ALASKA, INC., REQUESTS APPROVAL OF THIS DIVERTER SYSTEM AS A VARIANCE FROM 20AAC25.035(B) 1. 16" CONDUCTOR 2. SLIP-ON WELD STARTING HEAD ~' 3. FMC DIVERTER ASSEMBLY WITH TWO 2-1/16"- 2000 PSI BALL VALVES 4. 20" - 2000 PSI DRILLING SPOOL WITH TWO 10" OUTLETS. 5. 10" HCR BALL VALVES WITH 10" DIVERTER LINES, A SINGLE VALVE OPENS AUTOMATICALLY UPON CLOSURE OF ANNULAR PREVENTER. VALVES CAN BE REMOTELY CONTROLLED TO ACHIEVE DOWNWIND DIVERSION 6. 20" - 2000 PSI ANNULAR PREVENTER SRE 2J6/90 7 6 5 I 13 5/8" 5000 [-,.,I BOP STACK ACCUMULATOR CAPACITY TEST 1. CHECK AND FILL ACCUMULATOR RESERVOIR TO PROPER LEVEL WITH HYDRAUUC FLUID. 2. ASSURE THAT ACCUMULATOR PRESSURE IS 3000 PSI WITH 1500 PSI DOWNSTREAM OF THE REGULATOR. 3. OBSERVE TIME, THEN CLOSE ALL UNITS SIMULTANEOUSLY AND RECORD THE TIME AND PRESSURE REMAINING AFTER ALL UNITS ARE CLOSED WITH CHARGING PUMP OFF. 4. RECORD ON THE IADC REPORT. THE ACCEPTABLE LOWER LIMIT IS 45 SECONDS CLOSING TIME AND 1200 PSI REMAINING PRESSURE. BOP STACK TEST 1. FILL BOP STACKAND MANIFOLD WITH ARCTIC DIESEL. 2. CHECK THAT ALL HOLD-DOWN SCREWS ARE FULLY RETRACTED. PREDETERMINE DEPTH THAT TEST PLUG WILL SEAT AND SEAT IN WELLHEAD. RUN IN LOCK-DOWN SCREWS IN HEAD. 3. CLOSE ANNULAR PREVENTER AND CHOKES AND BYPASS VALVES ON THE MANIFOLD. ALL OTHERS OPEN. 4. TESTALL COMPONENTS TO 250 PSI AND HOLD FOR 10 MINUTES. INCREASE PRESSURE TO 3000 PSI AND HOLD FOR 10 MINUTES. BLEED TO ZERO PSI. 5. OPEN ANNULAR PREVENTORAND MANUAL KILLAND CHOKE LINE VALVES. CLOSE TOP PIPE RAMS AND HCR VALVES ON KILL AND CHOKE LINES. 6. TEST TO 250 PSI AND 3000 PSI AS IN STEP 4. 7. CONTINUE TESTING AL VALVES, LINES, AND CHOKES WITH A 250 PSI LOW AND 3(X)O PSI HIGH. TEST AS IN STEP 4. DO NOT PRESSURE TEST ANY CHOKE THAT IS NOT A FULL CLOSING POSITIVE SEAL CHOKE. 8. OPEN TOP PIPE RAMS AND CLOSE BO'I-rOM PIPE RAMS. TEST BO'FI'OM RAMS TO 250 PSI AND 3000 PSI. 9. OPEN PIPE RAMS. BACKOFF RUNNING JTAND PULL OUTOF HOLE. CLOSE BLIND RAMS AND TEST TO 3000 PSI FOR 10 MINUTES. BLEED TO ZERO PSI. 10 OPEN BLIND RAMS AND RECOVER TEST PLUG. MAKE SURE MANIFOLD AND LINES ARE FULL OF ARCTIC DIESEL AND ALL VALVES ARE SET IN THE DRILLING POSITION. 11. TEST STANDPIPE VALVES TO 3000 PSI. 12. TEST KELLY COCKS AND INSIDE BOP TO 3000 PSI WITH KOOMEY PUMP. 13. RECORD TEST INFORMATION ON BLOWOUT PREVENTER TEST FORM. SIGN AND SEND TO DRILLING SUPERVISOR. 14. PERFORM COMPLETE BOPE TEST ONCE A WEEK AND FUNCTIONALLY OPERATE BOPE DAILY. 1. 16" - 2000 PSI STARTING HEAD 2. 11" - 3000 PSI CASING HEAD 3. 11" - 3000 PSI X 13-5/8" - 5000 PSI SPACER SPOOL 4. 13-5/8" - 5000 PSI PIPE RAMS 5. 13-5/8" - 5000 PSI DRLG SPOOL W/ CHOKE AND KILL LINES 6. 13-5/8" - 5000 PSI DOUBLE RAM W/ PIPE RAMS ON TOP, BLIND RAMS ON BTM 7. 13-5/8" - 5000 PSI ANNULAR DRILLING FLUID PROGRAM (1L-24) Density PV YP Viscosity Initial Gel 10 Minute Gel APl Filtrate pH % Solids Spud to 9-5/8" surface casing . 8.6-10.0 15-35 15-35 50-100' 5-15 15-40 10-12 9-10 10% __ Drill out to weight up 8.6-9.3 5-15 5-8 30-40 2-4 4-8 8-10 8.5-9 4-7% Drilling Fluid System: Tandem Brandt Shale Shakers Tandem Derrick Shale Shakers Solids Processing System to minimize drilling waste Mud Cleaner, Centrifuge, Degasser Pit Level Indicator (Visual and Audio Alarm) Trip Tank Fluid Flow Sensor Fluid Agitators Notes: Weight up to TD 10.5 10-18 8-12 35-50 2-4 4-8 4-5 9.0-9.5 <10-12% Drilling fluid practices will be in accordance with the appropriate regulations stated in 20 AAC 25.033. Maximum anticipated surface pressure is calculated using a surface casing leak-off of 13.5 ppg EMW and a gas gradient of 0.11 psi/ft. This shows that formation breakdown would occur before a surface pressure of 2125 psi could be reached. Therefore, ARCO Alaska, Inc. will test the BOP equipment to 3,000 psi. The nearest well to 1 L-24 is 1 L-23. As designed, the minimum distance between the two wells would be 30' to surface. The wells would diverge from that point. Excess non-hazardous fluids developed from well operations and those fluids necessary to control the fluid level in reserve pits will be pumped down the surface/production casing annulus of the last well drilled. That annulus will be left with a non-freezing fluid during any extended shut down (> 4hr) in pumping operations. The annulus will be sealed with 175 sx of cement followed by arctic pack upon completion of fluid pumping. *Spud mud should be adjusted to a FV between 100-120 sec/qt to drill gravel beds. GENERAL DRILLING PROCEDURE KUPARUK RIVER FIELD 1L-24 . . . , . . . o , 10. 11. 12. 13. 14. 15. 16. 17. 18. 19. Move in and rig up Pool Rig 7. Install diverter system. Drill 12-1/4" hole to 9-5/8" surface casing point (4,949') according to directional plan. Run and cement 9-5/8" casing. Install and test BOPE. Test casing to 2,000 psi. Drill out cement and 10' of new hole. Perform leak off test to 12.5 ppg EMW. Drill 8-1/2" hole to logging point (9,387') according to directional plan. Run open hole evaluation logs. Run and cement 7" casing. Pressure test to 3,500 psi. ND BOPE and install temporary production tree. Secure well and release drilling rig. Run cased hole cement evaluation and gyro logs. Move in and rig up Nordic Rig 1. Install and test BOPE. Perforate and run completion assembly, set and test packer. ND BOPE and install production tree. Change over to diesel. Shut in and secure well. Clean location and release rig. ITEM (1) .Fee (2) Loc ** CHECK LIST FOR NEW WELL PERMITS ** APPROVE / 2. [2 thru 8] 3. 4. [9 t[hru 13']" ., · , ~.r~ *, ,~, [10 & 13] [14 thru 22] (5) BOPE ~. ~.///K(, .~-/~ - ~z [23 thru 28] (6) Other /~- ~A? [29 thrLJ ~] . 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. 17. 18. 19. 20. 21. 22. 23. 24. 25. 26. 27. 28. 29. 30. 31. 32. Company Is permit fee attached ............................................... Is well to be located in a defined pool ................. , ............. Is'well located proper distance from property line ................... is'well located proper distance from other wells ..................... Is sufficient undedicated acreage available in this pool ............. Is well to be deviated & is wellbore plat included ................... Is operator the only affected party .................................. Can permit be approved before 15-day wait ............................ Does operator have a bond in force ................................... Is a conservation order needed ....................................... Is administrative approval needed .................................... Is lease nLrnber appropriate ........................................... Does well have a unique name & n~rnber ................................ Is Wil to Is Wil Wil conductor string provided ......................................... 1 surface casing protect all zones reasonably expected serve as an underground source of drinking water .................. enough cement used to circulate on conductor & surface ............ 1 cement tie in surface & intermediate or production strings ...... 1 cement cover all known productive horizons ..................... Will all casing give adequate safety in collapse, tension, and burst. Is well to be kicked off from an existing wellbore ................... Is old wellbore abandonment procedure included on 10-403 ............. Is adequate wellbore separation proposed ............................. Is Lease $ Well ~ YES NO ,,t ., , a diverter system requi red ........................................ ~ Is drilling fluid program schematic & list of equipment adequate ..... Are necessary diagrams $ descriptions of diverter & BOPE attached .... Does BOPE have sufficient pressure rating -- test to ~~ psig ..... Does choke manifold comply w/API RP-53 (May 84) ...................... Is presence of H2S gas probable ...................................... FOR EXPLORATORY & STRAT I GRAPH I C WELLS: Are data presented on potential overpressure zones ................... Are seismic analysis data presented on shallow gas zones ............. If offshore loc, are survey results of seabed conditions presented... Add i t ional requirements ............................................. a REMARKS 0 -rZ '-,0 geology' eng i neer i ng.: DWJ MTN ~ ECS RPC~ BEW~ RAD JH ~ rev 03/29/91 jo/6.011 INITIAL GEO1 UNIT ON/OFF POOL CLASS STATUS AREA SHORE Additional remarks' Well History File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history file. To improve the readability of the Well History file and to simplify finding information, information, of this nature is accumulated at the end of the file under APPENDIXi No special'effort has been made to chronologically organize this category of information. * ALASKA COMPUTING CENTER * , , ****************************** *------- SCHLUmBeRGER -- .... -* ****************************** COMPANY NA~E : ARCO At, ASKA, INC, dELL SAME : lb'24 FIELD ~!AME : KUPARIJK RIVER UNIT ~OROUGH : NORTH SLOPE STATE : ALASKA API ~UMBER : 50-029'-2~170 REFERKNC~ NO : 92026 RECEIVED FEB 2. 5 1992. Alasl~ 01t & 8as Oons. Commission Anc~ra~ ;chlumberqer AlasZa Computtn~ Center 21-J~N-1992 05:01 **** R E F.... L HEADF. CR **** I) ~ T ~ : 92/01./21 O~IGIN I FLIC R~EL ?~A~,~E : 7459~ CONTI~,~U~TION ~ : CO:~,~8~{qT : ARCO ALASKA, INC., 1L-24, KUPARUK RIVER UHIT, 50-029-22170 **** TAP~ HE~[)ER **** S~TRVlCE N~M'E : EDIT D~TF : 92/01/21 OmIGIN : FLIC TAPE NA~E ~ 74599 CON'rI~U~TION ~ : 1 CO~ENT : ARCO ALASKA, INC., 15-24, KUPARUK RIVER UNIT, 50-029-22170 PAGE: **** FILM HEADER **** FILE ~ME : EDIT ,001 SERVICE : FLIC VERRION : 001~06 DATE : 92/01/21 ~X ~EC SIZE : ~024 FTLE TYPE : LO ******************************************************************************* ******************************************************************************* ** ** SCHL~!,qBERGER WELL SERVICES ** ******************************************************************************* ******************************************************************************* CO~IPA~Y NAME: aRCO ALASKA, INC. ~WLb: I L-24 STAT~;: ALA:~KA [,nc~'tTON: 567' FNL & 143' FEI, SECTIO?:: 3~ TU~.~?:S~{IP: ~IS Tame Yeriflcation L!stlnq ,chlU!r, Oer~er AlasKa Computin~ Center' 21-JAN-1992 o5:01 LnG MEASURED FRO~ RKB 130 ABOVE PERMANENT DATU~ El, Er ~TIO.NS K~: 1'~0 DF: 130 GL: 87 LOGGED: 19-~AY-91 9241 CASI~G : 9 518" 36 LB ~ D~!LLER DEPTH OF 5081 DENSITY: 10.5 ~UO PESISTIVITY: FILTRATE RESISTIVITY: ].7] M 77 4.06 8 77 v~aXI~,~II~ TEMm RECORDED: 147 bOGGIWG DISTRICT: PRUDHOE BAY HUSBAND RGS04] MDS037 FIELD REMARKS: BIT RUN ONE~ ORILbED INTERVAl., 5101' TO 9241' GAMMA RAY READING 76FT BENIND BIT RESISTIVITY READING 66MT BEHIND BIT, CDR $/N 043 PU~P NOURS: 46-~. 'CANNA RAY READING 76FT BEHIND BIT, DENSITY RE~DING 1]0MT BEHIND BIT. NEUTRON REA[>ING 1]6FT BEHIND BIT, DENSITY MATRIX: 2,65 G/CC. FLUID DENSITY: 1.0 G/CC, CD~ STABILIZER OD: 8.4375" C[)N PUMP HOURS: 46,7. STEERABLE BHA USE~ TO DRILL 8 1/2" H~LE. BIT TYPE: PDC. BARITE USED AS A ~UD ADDITIVe:. D~TE ,]OB STARTED: O]-JUM-91 jn~{ RFFERE~CE NO: 74599 LDPIANA: KOHR!NG PAGE: ******************************************************************************* FILE q~CO ALASKA INC. KUPARUK FIVER UNIT 1I,-24 50-n2q-?217n P. ATA Sl~-~mLEn EvEPY -.5000 F~2ET O~T~ I~CLU'OEO- ,IS ~rape yerificatlon I.istInq ~cblumberqer A!as~a Computl~o Center 21-JAN-tg92 05:0:I TOOL E×TENSION TOO!, ,b~o bOGGInG ~gIbE DRILLING RESISTIVITY/GR 5081' TO 9175' .LwO LOGGI~G ~iHILE DR!LLI~G NEUTRON/DENSITY 5081' TO 9111' THIS LIBRARY TAPE ~.~S B~ .... M REVISED TC{ INCLUDe] RECALIBRATED CnN DE~SITY DATA ~ A~A PRESENTED IS FRO~ 'RHOB ~AX' TABLE TYPE : CONS T,/~' !,,, VALU . DEFI TYPE .. F T FT FT FT MT FT G/C3 CP OEGF r)EG? 50-029-22~70 567' FNL & 143' FEi, ~ORTH SLOPE ALASKA USA 54~114 O. RKB ! 130. 87. 924!. 924~. 5081, 10.5 3.73 77, 77. Compan~ Name Field Name Well Name API Serial Number Field 5ocation Sectio~ Township ange ounty State or Province Nation witness' Name Service Order Number Permanent datum Elevation of Perm. Da Log ~easured From ABOV~ PER~NENT DATU~ Elevation of Kelly Bu Elevation of DerricM Elevation of Ground b Total DePth - Driller Total DePth - Log~er ZONE Bottom Log Interval Top bog Interval Drilling Fluid Type ZONE Drlllino Fluid Densit Drilling Fluid P~ ZONE Drllllno Fluid visco~ ZOgE ~rillinn Fluid Loss ZOnE Resistivity of ~ud Sa ~ud Sample Temperatur aesistivitv of ~ud fi ~ud Filtrate Sample T ~esistivitY of ~ud Ca ZONE ~ud.Ca~e Sample Tempe ZONE S~rface Temperature ,IS ~"ave Ver~fJ. catiot'~ Listlno ;chlu.,..~bercIer AlasKa CompQt.~.,~ Cent. er 21-JAS-1992 DEPT DePth Channel Fame PEF Photoelectric Factor D~H9 Delta RHO RfiS? $S9 ENO Density - LDT R~0~ ~ulK Densit~ nCAa. O~f{erentla Caliper D~HT Density Porosity DPOP nens~tV Porosity Outp%]t fro~u an AppllCat~on Pro,ram FC~L Far C~L Detector Counts NC~L ~ear CNL Detector Cou~ts TNPN Thermal ~eutron Porosity AWE RGS BHC ATTENUATIO~ ~E$ISTIVITY PSR RGS BHC PHAS~ S~iTFT RESISTIVITY DF~ DIELECTRIC RE6ISTIVlTY FROM RGS ROPF RATE OF DRILLIM~ PENETRATION GP Gamma Ray ** DATA FORMAT SPECImlCATION RECORD ** ** SET TYPE - 64MB ** Typ~ REPR CODE VALUE 1 6~ 0 ~ 66 0 3 73 64 4 66 1 5 66 ~chlumber~]er AlasKa Comoutinq CeDter 21-jAN-1992 05:01 8 68 0.5 68 t4 65 ]5 66 68 ~6 66 1 0 66 0 ** SET N~ F E V UNIT '! 0 DEPT FT 548 P~F L~{O 548 TYPE - CHAN · API APl PI FILE IIMB. NUMB PROCESS ORDER ~ bOG TYPE CLASS MOO NUMB SAMP EbEM CODE (HEX) ; ...... 14 00'''''000 ...... O0 '''';'' ...... ! ~ ...... l ''''''''''''''''''''''''''''68 000000 114 00 000 O0 0 1 1. 1. 4 68 0000000000 G/C3 54~1!4 O0 000 O0 0 1 I 1 4 68 0000000000 G/CB 548114 00 000 00 0 1 I ~, 4 68 0000000000 G/C3 548114 O0 000 O0 0 1 1 1 4 68 0000000000 IN 5481,14 O0 OOO O0 0 1 1 I 4 68 0000000000 PU 548114 O0 OOO O0 0 1 1 1 4 68 0000000000 PU 548114 O0 000 O0 0 1 1 1 4 68 0000000000 CPS 548114 O0 000 O0 0 1 ~ 1 4 68 0000000000 CPS 548114 O0 OOO O0 0 1 ! 1 4 68 0000000000 PU 548114 O0 000 OO 0 i 1 1 4 68 0000000000 0~ 548114 O0 000 O0 0 1 1 I 4 68 0000000000 OH~ 54~114 O0 000 O0 0 I 1 I 4 68 0000000000 O~ 54811~ O0 000 O0 0 I 1 1 4 68 0000000000 F/H~ 548114 O0 000 O0 O 1 1 1 4 68 0000000000 GAPT 54~114 O0 000 O0 0 I I 1 4 68 0000000000 mmmmmmmmm#mmmmmmmmmmmmmmmmmmmmmm.m.mmmmmmmmmmmmmmmmm#mmmmm#mmmmmmmmmm * * D A T A * * DFPT. FCNL.LWD PSP.L, wO 9243.500 -999.250 -999.250 -9~9.250 9200.000 -999.250 -90q.250 -999.250 9t00,000 2.486 19,819 2.621 PEF.LWD ~999.250 DRMO.[,WD 999.250 RO$2.LWD DCAL.LWD q99 250 DPHI.LW[) ~999.250 DPOR,LWD MCNb. LWD -999~250 TNPH,LWD -999.250 ATR LWD DER.LWD -999,250 ROPE,LwO 62.709 GR:LWD PF~.T, WD -99n 250 n~HO.bWO -999.250 ROS2,LWD DCAL'Lw~ -999~25o OPHI,LWD 999,~50 DPOR.LWD ;~CNL.LWD -999.250 T~PH.LWD ~999.250 ATR.LWD DFR.bwD -999.250 ~OPE,bWP 21.987 GR.LWD PFF.LWD 4.565 D~HO.I, wD 0.015 ROS2.LWD DCAL.LwD 0.990 DPH!.LwP 9.932 DPOR LWD ,~CNL.L~) 2Ol.236 TNPH.LWD 45.938 ATR~LWD r)ER.L~g 2.657 ROPE.LW0 19.210 GR,LWD '999,250 '999,250 '999,250 '999,250 =999,250 '999,250 '999,250 =999.250 2,486 724 86,308 ,IS Ta~e Verlflcation L1$t. l no :cblumbercer Alaska COm.DutJ~q Center DFPT 8900,000 P~O~' ~,¢!O 2.469 OC,t%[,. LW D FC t',~ t,' ' '~. [. ;~0 28.095 eS~, L~-:JO 5,608 DER DFPT, 8800,000 PEF,LWD ¢~B.LWB 2.398 DCaL.LwD FCNr,,tWO ~9,564 NCNL bwD ~$R.LWB 6,548 DER'LWQ. [)[:PT. 8600,000 PFF.DWD ~"OP.LWD 2.327 DCAL,LWD FCNL,L~D ~.9,759 NCNb,L~O vS~,L~ 2,323 DER,LWD DEPT. ~500,000 PEF.LWD R}~[)B.!.,~D 2,399 DCAL.BWD FCNL*LW[>, 2<),464 NCNL,LWD DS~.LWQ 3.502 DFR.!.,WD DEPT. 9400.000 PFF.LWD RNOB.I,W[~ 2,539 DCAb. LWD FCN[,.[,w~ 23.552 ~CNb. I.,WD PSU.[,~D 2,89~ OER.LWD DF:PT. 8300.000 PEF.bWO R~OF.[,wD 2,496 OCAL.bWD FC~I.,.L~D 21.1.12 NCNL.L~:D ~S~.[,'~D 4.293 DEP?. ~200,000 R~CJiB.L~D 2.408 FC~:L.t~D 22.671 ~CNL.LWD PS~.L~P 2,233 DER.LW9 DFPT. 8iO0.000 PEF.LWO R~tOB.L~h 2.423 DCAL.LWD FCN!..,L~p 23,276 21-JA~-1.992 05:01. 3,505 DRHO.L~D 0,387 DPNI. .hW;' F 224'592 TNPH,LWD 4.957 ROPE.LWD 3,432 D~HO,I, WD 0.186 DPEI.hWD 235,164 TNPH,LWD 5.473 ROPE,LWD 3.028 DCHO.hND 0.104 OPEI.bWD 241,656 TNP?t,5~O 6,595 ROPE,bWO 3.912 DRMO,LWD 0,306 DPMI.LWD 202,063 TNPM.bWD ~.,797 ROPE,LWD 4,378 DRNO.LWD 0,123 DPHI,LWD 202,353 TNPH,LWD 2.233 ROP~,bWO 3,925 DRHO,LWD 0 125 DPHI,LWD 206:~59 TNPH.LWD 3.426 ROPE,LWD 7,209 DRMO.LWD 0 099 DPHI,bWD 223:334 T~PH.LWD 2.797 ROP[<,L~D 5.010 DRNO.bwD 0 31} DP~I,SWD 214:073 TNPH.LWD 3,815 ROPE.L, wD 4.034 DR~.LWD 217,212 TNPH.LWQ 2.268 ROPE,LWD 3.971 DRMO.LWD 0.000 DPHI.LWD 218.395 TNPH.bWO 3,527 ROPE.DwO 3.740 OR~O,[,WD O.e00 DP~!.LWD 203.458 T~Fg. LWD 2,227 RDPE.L~O 0.018 466 90.910 0 003 10i975 33212 112.425 0.004 ~5.269 30.217 116.393 0.007 14.579 46.935 !26,682 49,899 144.327 0.OO4 15.220 47.107 121.091 -0 052 6:725 41.461 !26,427 -0.025 9.303 46 038 156:291 -0.O10 14 642 41:748 2!8.949 -0.012 13.75~ 38.490 260.386 -0.016 22.093 43,~66 267.560 R052 LWD DPOR:LWD ATR.LWD GR.hWD ROS2 LWD DPOR:LWD ATR..LND GRoLWD ROS2 DWD DPORiSWD ATR LWD GR.bWD RO$2.LWD ROS~,LWD DPO~.LWD ATR.LWD GR.LWD RO$~,LWD DPOR,bWD ATR,LWD GR.LWD ROS~,LWD DPOR.bWD ATR.LWD GR.LWD RO$2.LWD DPOR,LWD. ATR.LWD GR.LWD ROS2.LWD DPOR.LWD ATR LWD GR:LWD ROS2.LWD DPOR.LWD ATR.LWD GR.LWD RO$2.LWD DPOR.LWD ATR.LWD GR,LWD PAGE: .,461 ,466 14,994 77.229 75,453 2,39 15,26~ 6..~ 15 68,~23 2'409 14,579 1'.657 106,545 2.,327 I :220 .:180 145'665 2,539 18 145 · 2,496 ,303 167 ,270 ,389 2,408 14,642 2'331 124.492 I 751 252 107.600 2,285 22,093 2 023 111:402 ,I$ Ta~e Verlficatio~ Listin~ 21-JAN-1992 05:01 PAGE: 7 ~chlul~.berger Alaska Comautlnc~ Center DWp?. 790(3.{')09 P~?F. [,~D 4.337 DRHO. b~;O -0.018 ROS2 LWD ~,587 FCN~.L~D 91,775 NCNL,L~ 206.959 T~PH, LW[) 40,697 ATR,LWD DSp. b~'~) 3.684 OER,LWD 3.618 ROPE,hWD ~53.1()7 GR,LWD 114,481 D~:P~' 78C~O,000 PEF,LWD 3.8~9 D~0.L~9 -0.006 ROS25WD 2'544 R ~(}~: [., ~P 2,544 DCAL,LWD 0,342 DPHI,I.,WO 6.445 DPOR:bWD 6,445 FCS. t-.Lw9 3~,0~g ~CNL.LWD 252.733 T~'.~PH.L~D 28,220 ATR,LWD 3;4~9 PS ~. Lt~D 3,151 ~ER. Lmm') 3,240 ROPE,LwO 324. 154 GR,bWD DFPT 7700,000 PEF I.~WD 4,19g DPHO,LWD -0,015 ROS~,LWD 2,~87 ]~OB [ [..~O 2,387 DCAL'LwD 0,~03 DDHI,LW[) 15,964 DPOR,LWD 15,9~4 FCNL. L%,~[) 20,5t2 ~CNL~LWD 201,619 T~.~P~, L~D 44,919 ATR,LWD PS~. [,,W~ 3.614 DER.LWD 3,562 R(.,PE, 5WD 256.659 GR,LWD 127,274 R~O~ I..~D ~,394 OCAL,LWD 0,09~ DPHI,bWD ~5~514 DPOR,LWD 1~'~514 FC:'~ t, ~ I,, wO ~1,050 ~qCNb. LWD 205.454 T?~'PH, bWD 43.679 ~TR,LWD PS~.L~D 3,060 OER,GWD 2,621 ROPE, {~%qD 190,630 GR,SWD D~PT, 7500,000 PFF,LWD 3.694 DRHO. L~{O -0,016 ROS2.LWD 2'402 FCNL L~n 2 ,077 h..NL . O ~12, .~,. , PS~, L~ ..749 DER,LWD 3, 07 ~QPE. L~D 240.383 GR,~WD ~8~,964 P~P~ 7400,000 P~ Lw~ 2,9 I ~RHO,~WO 0 019 RO~2 ~WD R[~GB.[,wD 2,360 OCAL.hWD 0.~ 1 OPNI.hWD 7.601 DPOR [,WD 1 .601 FC~L.L~O 22.852 ~CNL.bWD 22~.941 T~,~PN.SWO 45,531 ATR LWD 2,140 PS~.[.WD ~,044 D~R. LWt:) ~,078 ROPE,~WD 256.368 GR,LWD 80,214 DFPT. 7300,000 PFF.LWD 3041 DR~[~,LWD 0 9~8 ROS~,LWD 2'4t2 R,O~ L~...{D 2.412 DCAL.LW0 0~403 DP,I.LWO 14~,~5 DPO~,LWD 14:~15 FCNL~[.~I~ 24,n47 ~CNL.LWD 219 655 TNPH,L~D 36 $23 ATR,LWD 3 27 PS~. [., :,~ 3.;43 O~R,Lwo 3.231 ROPE. [,WD 250.391 GR.LWD 83.937 DEPT. 7200.000 PEF.LWD 3.016 DRHO,LWD -0 008 ROS2.bWD 2,336 5WD 19~054 DPOR,LWD 19'054 FC ~.~ L. L .~ nR ~ [3~, b ~ D 26. 6722'336 DC a [.,. bW D NC~ L, hW D 226 ~ 2410051 DP~ ~, t~W0 32· 555 A TR, 5WD T~qPN'LwD ]1] ~41 G~,LWD 9~.~9~0 PS~.L~dD 3,073 OER,LWD 3,1(30 ROPE, . DEPT. 7JO0.000 P~F,LWD 2,951 D~HO,LWD -0.005 ROS2 LWD 2,~56 L ~ 17,828 DPOR:LWD 17,828 R~. L~[~ 2.356 QCAL.LWO 0.190 OPHI,. w . FCs:L.LWD 23.954 ~C~;L.LWD 214,933 T~PH.u Q 36 484 AT~,LWD 2,4]0 PS~. [,'~;~) 2.378 OER,LWD 2.397 ~f~PE.LW~ 280.513 GR,LWD 87,712 D~T. 7000,000 PEF.L~D 3.006 O~HO.LWO 0.003 ROS2.LWD 2,]95 ~uOB, [.~.p 2.395 DCAL,LWO 0,201 DDWI.L~D 15.459 DPOR,LWD 15,459 FCfcL,L?n ~3.09(~ NCNL.,LWD 211,853 Ti~PN.LWD 38500 ATR 5WD 2,74{ ~Sn. l.. :.~n 2.39~ DF~.L~D ~.504 ROPF.t, wD 254~037 GR~SWD 97,508 DFpT. 69OC,000 PEF.I.wD 3.193 DRHQ,GWD -0.008 ROS2,LWD 2,{41 R~O~. L"~ 2.34t DCAL.LWD 0.02~ DPH] ,Lw;3 18745 DPOR,LWD 18,745 FO{cl.. . [.w~) 22.. !47 f'~C~~,~. LWr.,.. 210.40~ T~JPE.~ . LwD 37~972 ATR,LWD PSP. [.:v{O 2,347 DFR,Lw[~ 2,345 RC~PE~, LWD 225.590 GR,LWD 91,552 ,IS Tape Verification I. ist!no ichlumberqer AlasKa Computlr~g Center 21-JAN-1992 ©5:01 DEPT. 6800.000 PEF.LWD 3.026 FCNL.LWO 2].lO0 NCNb,I.,VD 210.524 P$~.L~D ~.557 D~.LWQ ~.5~0 DFPT. 6700,.0{., ?EF LWD 2,903 ~HO¢ .'[.,WD 2.302 DCAL,LCD 0.003 FC~L,LW¢ 24.321 NCNL,LW¢ 219,563 PS~. b'~f~ 2. 966 DER. L,~{'3 2,881 6600. 000 PEF. LWD 2. 922 2,2~0 DCAL.LWD 0,002 24,800 NCNL.LWD 218.281 3. 103 DER. LWD 3.135 DEPT. 6500.000 PEF.LWD ~,887 RNOg.L%~D 2.305 DCAL.LWD 0.117 FCNL.LWO 24,668 ~CNL.LWD 216,712 PS~,L~D 3.015 DER.LWD 2,997 DEPT. 6~00,000 PEF.LWD 2.970 R~OB,LWD 2,296 DCAL.LWD 0.222 FCNL.LWD 21.304 NCNI..,LWD 209,708 PS~.LWD 2,444 DER,LwD 2,446 DLP'~T, 6300.000 PEF.LWD 2,979 RHOP.L;~D 2.265 DCAL,LWD 0,005 FCNI:.L~O... 22.780 ~NL~.~ ~.LWD 209,895 PS~.L~D 2,597 ~ER.LWD 2,574 D~PT. 6200,000 P~W.LWD 2.949 ~NOm.t,~D 2,330 DCAL.LWO 0,238 PS~.I.,w!') 2,563 9ER.LWD 9.561 DEPT. 6100.000 P~F.LWD 3 045 R~O~.LWD 2,299 DcAS.LWD 01213 FCNI.L~iD ~2,516 NCNL.LWD ~08'582 PS~.I. WD 2.655 DE~,LW9 2.616 pFpT. 6000,000 PEF.LW~ 2.q~7 CaOS.LWD 2.2~9 DCaL,LWP 0.053 FC~[,L~9 21.472 '~CNL,LwB 206.O52 PSP.L~9 2,597 9~R.LWO 2.607 DFPT. 5900,000 PEF.I,W{) 3.021 R{~O¢.bw!~ 2.377 DCAL.LV~['> 0.138 FCHL.[,~D 21.761 ~CNL.LWD 20~.567 PS~.Lwn 2.a42 DF~.LWD 2.8bl DEPT, 5800,000 PEF. i,:~.-"O 2. 957 p~(;P. Lt~f~ ?, 24~> DCAL, LSD 0,055 FC~,~I,. I,'~:h 20.558 ~CN L,. l.,W~'> 201.941 DR}.iO.LWO 0.074 ROS2.LWD 2.592 DPM!.LWD 3. 515 DPOR.LWD 3,515 TNPH,LWD 381898 ATR.LWD ~,567 ROPE.LW9 ~831052 GR.LWD 91'707 DPEO.LWD -0.009 RO$2,LWD 2,302 DPHI'LWD 21 080 DPOR.LWD TNPE.Bw9 371477 ATR,L~D 2,350 -o.oov ROS .U U T~.LWD 36.057 ATR.LWD ~ 197 ROP~.LwD 218.525 GR.bWD 6_:]325 OR e,hwO -o.oil aos2 05 DPHI',LWD 20,884 DPORiLWD 2v, 84 T~PH,SWD 33.768 ATR,LWD ~ 966 ~DP~,LWD 165,028 GR,LWD 8_1513 DRUO,LWD -0 012 ROS2.LWD TNPH.DWD 42 387 ATR.BWD 448 ROPg,:LWD 88.294 GR.LWD 6~,054 ROPE.h~D 252~000 GR'B~D DREO.LWD -0 007 ROS2.LWD 2,330 DPFI,LWD 19:4~! DPOR,LWD ~9,4~ TNPi~.hWD 38' 797 ATR,LWD 2,557 h~O -0 007 R052 LWD ~.299 DRHO, . DPHI.bWO 21 292 DPOR~tWD 2~,292 TNPiq B~D 37~386 ATR LWD 554 ROPE,bWD 172'403 GR.LWD 7 732 DRHO.bWD -0.006 RO$2.LWD 2,289 DPH].bw~ 2!.892 DPOR LWD 2~,892 TNPH.L~D 4~.065 ATR:LWD ~,624 ROPF,bw9 348.708 GR.LwD DRHO.LWD o 004 RO$2.LWD 2,377 DPMI.LWD 161539 DPD~.LWD TNPH,bWD 38.598 ATR.LWD 2 ~95 ROP~.L'w9 260.230 GR.LWD 77:78 DRNO.LwO 0 004 ROS2.LWD ~.240 DP~l.bWD ~41854 DPOR.LWD 2 854 TNFH.Lw5 42.250 AT~.LWD ~:424 POP~f,L~vt> 292.328 GR.LWD 90,296 ,IS Tave Yeri,~lcation Listlnq ;chlu~berqer AlasKa Co.mPutlnq Center 21-JAN-19g2 05:Ol PAGE: 9 DEPT. 5700.000 PF, F. L~WD ~.949 DRY'O. LwD 0.005 ROS2.BWD ~ 256 ~OP,.LWO 2.~56 DCfiL.~D 0.04~ 5PHI.LWO ~3.879 ~POR LWD 2~ 879 PSP.L~O ?.51~9 P~R.LWO ~.5~0 ~OPE.LwD 20~.455 GR.LWD 57 ~4~ F3E'p~~ 5600 ooo PEF bWo 2.868 DR~ 5~D 0 017 ROS2.LWD 2.352 RF~O~. I.,~n 2.352 D ,.AL. [,w[:~ 0.138 DPHI. L~t, 18~046 DPOR.LWD 18,046 FCNL. I~,,FO ~0.832 NCNL.LWI~ 205.973 TNPH.LWD 4~.~1~ ATR.BWD 3.203 DS~. I.~ ~'h 2.960 OE~. L',~D 3.037 Rr~PE.LwD 216.180 GR.LWD 68.879 ~.O~.I..,~D ~.2~2 DCAh. LwO 1.544 OPHI.L~D 26.53] DPOP.LWD 2~33 FC?~I,. L'~O 16.54,1 ~{':Nb. L~D I 80. 835 TNPH. 5~:D 51 .B30 ATR.BWD 59 PSP I,~D 3 387 DER LWD 3 443 R["~PE..~v;D 107.872 GR.LWD 62,347 D['~PT. 5400.000 PF, F. LW[) 2.878 DP:NO.hWD 0.002 ROS2.LWD 2,365 FC N [,.,. L ~[') 20.58~ NCNL.LWD 202.044 T~,~PN. bW[', 43.06] ATR.LWD PS~.L~O 2.422 DER.I,WD 2.355 ROPE.bWD 313.948 ~R.5~D 93.057 OFPT. 530C~.000 PEF.bwD 2.924 D~HO.Lwo -0 012 ROS2 I~WD 2.2~1 FCNL.[,~h 20.38~ NCNL.L~'O 198.911 TNPH.bWD 42 782 ATR,LWD 3,;270 PSP.LWD 3.~6~ DER.LWD 3.~97 ROPE. GW[) 263 641 GR.LWD 84,615 DEPT. 5200,000 PEF.bWD 3.037 DRHO.LWO 0.005 ROS2.LWD 2.246 R~O~,. [,~D 2.246 DCAB. !.,WD 0 000 OPHI.LWD 24.486 DPOR.LWD 24.486 FC~'~ L. [,, ~,~ D 17.402 ~(~CNL. LWD 191~554 T~,~PH. T~WD 52.024 ATR.bWD PSR.I.,WD 2,291 DER.LW~ 2.307 ROPF:. L~D 340.438 GP*LWD 86,203 RHO~:5;~D 2.049 DCAL.LWD 1.819 DP~I.5~D ~6:.00 DPOR.LWD 3..400 FONL. L:,dD 15.~07 NCNL.LWD 170.825 'T~'~.~ PH. hw D 54 070 ATR.BWD ~.944 ~SR. !,'~D 2.772 DER.LWD 2.829 R[TPF:. LWD 444~284 GR.LWD 7 .697 DEPT 5000.000 PEF.BwD 100.000 DRHO.LWD -0.381 ROS2 DWD ~ 402 PNOF~LWD 2.402 DCAI,. LWQ 0 966 DPEI.LWD 15.01.0 DPO~ :LWD FEN[,. bt~n 15.453 NCNb. UWD 175~570 Tt~Ph. 5wD 56.411 ATR LWD -999'250 PSR. L%."~ D -999. 250 DER. bw~ -999.250 Rf)PE. L~O -999. 250 GR: LWD -999,250 DFPT. 4965.500 PEF. ~,~D -999.250 DPHO.LWO -999.250 ROS2.LWD -999 250 P~O~. I,~D -999.250 DCAL. I.,WD -999 250 DP~T.BWD -999. 250 DPOR.LWD -999:250 FC~,. l,~P 14.322 ~CNL. L%~D -999:250 TNPH.BWO -999.250 ATR.LWD -999.250 PSp.[,t~o -99Q.250 t~ER.LWt} -999' ~50 RPPF.LwD -999.250 GR.LWD -999.250. ** E~ OF DATA IS Tape verJ. flcatlon Listing cblumberger f{!asKa Co,~put~.nq Center **** FILE 8~]RVICE : ~LIC DATE : 92/01121 ~X REC SIZE : 1024 FtLE TYPE : bAST FILE **** TAPE T~AIL~;R **** SE~VIC~' NA~E .... : EDIT [)aw~ : q2/Ol/?l ORIGIN : ~blC TAPM ~A~E : 74590 CnNTINUATION # : % PREVIOUS TAPE ~ CO~MNT ! ARCO ALASKA. INC.. lL-24, KOPARUK RIVER UNIT, 50-029-22170 **** REEl, TRAILER **** SERVICE NA~E : EDIT DATF : 92/0il21 ORIGIN : FLIC RFEL ~:A~E : 74599 CONTI~!U~TION # : P~EVIOUS REEb : CO~E~T : ~RCD ALASka. INC.. 1L-24, KUP~RUK ~IVE~ UNIT, 50-029-22170