Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAboutPBU CCP/FFGU - BP and Hilcorp2. Facility Name
PBU CCP/FFGU
Percent
100.00%
MCF
19. Remarks:
(346) 237-2244 Date 8/17/2020
Block 6: Includes Gas Sales to Alyeska Pipeline, Norgasco, Northstar and KRU; Block 12: Includes COTP Non-PBU Fuel Gas = 2,117 mscf; Block
18: Fuel Gas to LPC = 0 mscf
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signature Title Production Analyst
Note: All volumes must be corrected
to pressure of 14.65 psia and to a
temperature of 60o F. Authority 20
AAC25.235.Printed Name Tommy Hoang Phone
Date
MCF
15. NGL Gas Equivalent 0
Conservation MCF
16. Purchased gas 0 Waste:
17. Transferred from: CGF & FS1 200,118,884
18. Transferred to: (Express as a negative #)0 Commissioner
13. Other (see instructions)0 Official Use Only
Authorization >1 hr:Safety MCF
14. TOTAL VOLUME (ITEMS 6-12)200,118,884
Lease Use
12. Fuel gas used in lease operations.5,826,239
10. Pilot and Purge 36,158
11. Assist Gas 0
9. Flared or vented more than 1 hour (see instr.)0
8. Flared or vented 1 hour or less 4,768
0290000000 PBU - EOA HILCORP July-2020
Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold 347,666 Pool Name Pool Code
7. Reinjected 193,904,053 PRUDHOE 640150
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number 3. Field 4. Operator 5. Month/Year of Disposition
Tommy Hoang
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
HILCORP ALASKA
PRUDHOE BAY UNIT - CENTRAL COMPRESSOR PLANT
GAS FLARING AND VENTING INCIDENT REPORT
July 2020
Unplanned events less than or equal to 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
7/19/2020 0152-0222 3,774 Not required for events <= 1 hr Not required for events <= 1 hr
7/24/2020 1616-1621 156
TOTAL 3,930
Unplanned events greater than 1 hour
DATE TIME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
See Attachments See Attachments
TOTAL 0
Planned events less than or equal to 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
7/26/2020 1445-1450 135 Not required for events <= 1 hr Not required for events <= 1 hr
7/28/2020 2245-2250 408
7/29/2020 2030-2035 152
7/31/2020 2027-2032 135
7/31/2020 2239-2244 8
TOTAL 838
Planned events greater than 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
See Attachments See Attachments
TOTAL 0
TOTAL
Unplanned Events < 1 Hour 3,930
Unplanned Events > 1 Hour 0
Planned Events < 1 hour and not 838
exceeding 5,000 MCF
Planned Events > 1 hour or 0
exceeding 5,000 MCF
Pilot Purge 36,158
Assist 0
TOTAL FLARED VOLUME 40,926
2. Facility Name
PBU CCP/FFGU
Percent
100.00%
MCF
19. Remarks:
0 Commissioner
(346) 237-2244 Date 9/17/2020
Block 6: Includes Gas Sales to Alyeska Pipeline, Norgasco, Northstar and KRU; Block 12: Includes COTP Non-PBU Fuel Gas = 3,220 mscf; Block
18: Fuel Gas to LPC = 0 mscf
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signature Tommy Hoang Title Production Analyst
Note: All volumes must be corrected
to pressure of 14.65 psia and to a
temperature of 60o F. Authority 20
AAC25.235.Printed Name Tommy Hoang Phone
12. Fuel gas used in lease operations.5,513,845
Date
MCF
15. NGL Gas Equivalent 0
Conservation MCF
16. Purchased gas 0 Waste:
17. Transferred from: CGF & FS1 187,446,737
18. Transferred to: (Express as a negative #)
13. Other (see instructions)0 Official Use Only
Authorization >1 hr:Safety MCF
14. TOTAL VOLUME (ITEMS 6-12)187,446,737
Lease Use
11. Assist Gas 0
9. Flared or vented more than 1 hour (see instr.)0
10. Pilot and Purge 36,244
8. Flared or vented 1 hour or less 803
0290000000 PBU - EOA BP August-2020
Disposition Volume MCF 20.For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold 372,078 Pool Name Pool Code
7. Reinjected 181,523,767 PRUDHOE 640150
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number 3. Field 4. Operator 5. Month/Year of Disposition
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
HILCORP ALASKA
PRUDHOE BAY UNIT - CENTRAL COMPRESSOR PLANT
GAS FLARING AND VENTING INCIDENT REPORT
August 2020
Unplanned events less than or equal to 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
8/13/2020 1829-1834 135 Not required for events <= 1 hr Not required for events <= 1 hr
8/16/2020 1402-1407 135
TOTAL 270
Unplanned events greater than 1 hour
DATE TIME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
See Attachments See Attachments
TOTAL 0
Planned events less than or equal to 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
8/1/2020 0130-0135 135 Not required for events <= 1 hr Not required for events <= 1 hr
8/1/2020 0330-0335 8
8/1/2020 1029-1034 135
8/6/2020 2031-2036 156
8/6/2020 2324-2329 11
8/16/2020 1620-1625 77
8/16/2020 1822-1827 11
TOTAL 533
Planned events greater than 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
See Attachments See Attachments
TOTAL 0
TOTAL
Unplanned Events < 1 Hour 270
Unplanned Events > 1 Hour 0
Planned Events < 1 hour and not 533
exceeding 5,000 MCF
Planned Events > 1 hour or 0
exceeding 5,000 MCF
Pilot Purge 36,244
Assist 0
TOTAL FLARED VOLUME 37,047
2. Facility Name
PBU CCP/FFGU
Percent
100.00%
MCF
19. Remarks:
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number 3. Field 4. Operator 5. Month/Year of Disposition
0290000000 PBU - EOA HILCORP September-2020
Disposition Volume MCF 20.For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold 377,585 Pool Name Pool Code
7. Reinjected 194,634,708 PRUDHOE 640150
8. Flared or vented 1 hour or less 135
9. Flared or vented more than 1 hour (see instr.)0
10. Pilot and Purge 35,060
11. Assist Gas 0
13. Other (see instructions)0 Official Use Only
Authorization >1 hr:Safety MCF
14. TOTAL VOLUME (ITEMS 6-12)200,625,103
Lease Use
12. Fuel gas used in lease operations.5,577,615
Date
MCF
15. NGL Gas Equivalent 0
Conservation MCF
16. Purchased gas 0 Waste:
17. Transferred from: CGF & FS1 200,625,103
18. Transferred to: (Express as a negative #)0 Commissioner
(346) 237-2244 Date 10/14/2020
Block 6: Includes Gas Sales to Alyeska Pipeline, Norgasco, Northstar and KRU; Block 12: Includes COTP Non-PBU Fuel Gas = 4,855 mscf; Block
18: Fuel Gas to LPC = 0 mscf
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signature Tommy Hoang Title Production Analyst
Note: All volumes must be corrected
to pressure of 14.65 psia and to a
temperature of 60o F. Authority 20
AAC25.235.Printed Name Tommy Hoang Phone
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
HILCORP ALASKA
PRUDHOE BAY UNIT - CENTRAL COMPRESSOR PLANT
GAS FLARING AND VENTING INCIDENT REPORT
September 2020
Unplanned events less than or equal to 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
9/11/2020 0426-0431 135 Not required for events <= 1 hr Not required for events <= 1 hr
TOTAL 135
Unplanned events greater than 1 hour
DATE TIME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
See Attachments See Attachments
TOTAL 0
Planned events less than or equal to 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
Not required for events <= 1 hr Not required for events <= 1 hr
TOTAL 0
Planned events greater than 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
See Attachments See Attachments
TOTAL 0
TOTAL
Unplanned Events < 1 Hour 135
Unplanned Events > 1 Hour 0
Planned Events < 1 hour and not 0
exceeding 5,000 MCF
Planned Events > 1 hour or 0
exceeding 5,000 MCF
Pilot Purge 35,060
Assist 0
TOTAL FLARED VOLUME 35,195
2. Facility Name
PBU CCP/FFGU
Percent
100.00%
MCF
19. Remarks:
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number 3. Field 4. Operator 5. Month/Year of Disposition
0290000000 PBU - EOA Hilcorp October-2020
Disposition Volume MCF 20.For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold 407,029 Pool Name Pool Code
7. Reinjected 213,218,445 PRUDHOE 640150
8. Flared or vented 1 hour or less 437
9. Flared or vented more than 1 hour (see instr.)0
10. Pilot and Purge 35,834
11. Assist Gas 0
13. Other (see instructions)0 Official Use Only
Authorization >1 hr:Safety MCF
14. TOTAL VOLUME (ITEMS 6-12)219,641,085
Lease Use
12. Fuel gas used in lease operations.5,979,340
Date
MCF
15. NGL Gas Equivalent 0
Conservation MCF
16. Purchased gas 0 Waste:
17. Transferred from: CGF & FS1 219,641,085
18. Transferred to: (Express as a negative #)0 Commissioner
(346) 237-2244 Date 11/13/2020
Block 6: Includes Gas Sales to Alyeska Pipeline, Norgasco, Northstar and KRU; Block 12: Includes COTP Non-PBU Fuel Gas = 0 mscf; Block 18: Fuel
Gas to LPC = 0 mscf
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signature Tommy Hoang Title Production Analyst
Note: All volumes must be corrected
to pressure of 14.65 psia and to a
temperature of 60o F. Authority 20
AAC25.235.Printed Name Tommy Hoang Phone
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
HILCORP ALASKA
PRUDHOE BAY UNIT - CENTRAL COMPRESSOR PLANT
GAS FLARING AND VENTING INCIDENT REPORT
October 2020
Unplanned events less than or equal to 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
Not required for events <= 1 hr Not required for events <= 1 hr
TOTAL 0
Unplanned events greater than 1 hour
DATE TIME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
See Attachments See Attachments
TOTAL 0
Planned events less than or equal to 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
10/3/2020 1222-1227 135 Not required for events <= 1 hr Not required for events <= 1 hr
10/3/2020 1445-1450 8
10/7/2020 1109-1114 159
10/27/2020 0224-0229 135
TOTAL 437
Planned events greater than 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
See Attachments See Attachments
TOTAL 0
TOTAL
Unplanned Events < 1 Hour 0
Unplanned Events > 1 Hour 0
Planned Events < 1 hour and not 437
exceeding 5,000 MCF
Planned Events > 1 hour or 0
exceeding 5,000 MCF
Pilot Purge 35,834
Assist 0
TOTAL FLARED VOLUME 36,271
2. Facility Name
PBU CCP/FFGU
Percent
100.00%
MCF
19. Remarks:
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number 3. Field 4. Operator 5. Month/Year of Disposition
0290000000 PBU - EOA Hilcorp North Slope, LLC November-2020
Disposition Volume MCF 20.For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold 426,413 Pool Name Pool Code
7. Reinjected 209,449,492 PRUDHOE 640150
8. Flared or vented 1 hour or less 2,233
9. Flared or vented more than 1 hour (see instr.)0
10. Pilot and Purge 34,627
11. Assist Gas 0
13. Other (see instructions)0 Official Use Only
Authorization >1 hr:Safety MCF
14. TOTAL VOLUME (ITEMS 6-12)215,927,251
Lease Use
12. Fuel gas used in lease operations.6,014,486
Date
MCF
15. NGL Gas Equivalent 0
Conservation MCF
16. Purchased gas 0 Waste:
17. Transferred from: CGF & FS1 215,927,251
18. Transferred to: (Express as a negative #)0 Commissioner
(346) 237-2244 Date 12/16/2020
Block 6: Includes Gas Sales to Alyeska Pipeline, Norgasco, Northstar and KRU; Block 12: Includes COTP Non-PBU Fuel Gas = 4,034 mscf; Block
18: Fuel Gas to LPC = 0 mscf
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signature Tommy Hoang Title Production Analyst
Note: All volumes must be corrected
to pressure of 14.65 psia and to a
temperature of 60o F. Authority 20
AAC25.235.Printed Name Tommy Hoang Phone
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
HILCORP ALASKA
PRUDHOE BAY UNIT - CENTRAL COMPRESSOR PLANT
GAS FLARING AND VENTING INCIDENT REPORT
November 2020
Unplanned events less than or equal to 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
11/12/2020 1606-1611 8 Not required for events <= 1 hr Not required for events <= 1 hr
11/12/2020 1654-1701 8
11/12/2020 1738-1743 8
11/13/2020 1732-1737 8
11/13/2020 1741-1746 8
11/13/2020 1812-1817 8
11/14/2020 0223-0228 14
11/16/2020 1752-1757 8
TOTAL 70
Unplanned events greater than 1 hour
DATE TIME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
See Attachments See Attachments
TOTAL 0
Planned events less than or equal to 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
11/12/2020 0213-0218 156 Not required for events <= 1 hr Not required for events <= 1 hr
11/12/2020 0425-0430 8
11/12/2020 0758-0803 141
11/12/2020 1059-1104 8
11/12/2020 1555-1600 156
11/14/2020 1232-1237 135
11/15/2020 1231-1236 135
11/15/2020 0215-0220 14
11/15/2020 2305-2310 135
11/16/2020 0106-0111 14
11/16/2020 0513-0518 135
11/16/2020 0706-0711 14
11/17/2020 0207-0212 135
11/17/2020 0440-0445 8
11/17/2020 1349-1354 135
11/17/2020 1546-1551 8
11/17/2020 2259-2304 135
11/18/2020 0055-0100 8
11/18/2020 1252-1257 8
11/21/2020 1009-1014 135
11/21/2020 2326-2331 77
11/22/2020 0926-0931 8
11/22/2020 1258-1303 156
11/22/2020 1333-1338 8
11/22/2020 1930-1935 156
11/23/2020 0708-0713 135
TOTAL 2,163
Planned events greater than 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
See Attachments See Attachments
TOTAL 0
TOTAL
Unplanned Events < 1 Hour 70
Unplanned Events > 1 Hour 0
Planned Events < 1 hour and not 2,163
exceeding 5,000 MCF
Planned Events > 1 hour or 0
exceeding 5,000 MCF
Pilot Purge 34,627
Assist 0
TOTAL FLARED VOLUME 36,860
2. Facility Name
PBU CCP/FFGU
Percent
100.00%
MCF
19. Remarks:
0 Commissioner
346-237-2244 Date 1/15/2021
Block 6: Includes Gas Sales to Alyeska Pipeline, Norgasco, Northstar and KRU; Block 12: Includes COTP Non-PBU Fuel Gas = 1,482 mscf; Block
18: Fuel Gas to LPC = 0 mscf
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signature Tommy Hoang Title Production Analyst
Note: All volumes must be corrected
to pressure of 14.65 psia and to a
temperature of 60o F. Authority 20
AAC25.235.Printed Name Tommy Hoang Phone
12. Fuel gas used in lease operations.6,578,869
Date
MCF
15. NGL Gas Equivalent 0
Conservation MCF
16. Purchased gas 0 Waste:
17. Transferred from: CGF & FS1 245,283,305
18. Transferred to: (Express as a negative #)
13. Other (see instructions)0 Official Use Only
Authorization >1 hr:Safety MCF
14. TOTAL VOLUME (ITEMS 6-12)245,283,305
Lease Use
11. Assist Gas 0
9. Flared or vented more than 1 hour (see instr.)0
10. Pilot and Purge 35,599
8. Flared or vented 1 hour or less 318
0290000000 PBU - EOA HILCORP NORTH SLOPE December-2020
Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold 491,673 Pool Name Pool Code
7. Reinjected 238,176,846 PRUDHOE 640150
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number 3. Field 4. Operator 5. Month/Year of Disposition
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
HILCORP ALASKA
PRUDHOE BAY UNIT - CENTRAL COMPRESSOR PLANT
GAS FLARING AND VENTING INCIDENT REPORT
December 2020
Unplanned events less than or equal to 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
Not required for events <= 1 hr Not required for events <= 1 hr
TOTAL 0
Unplanned events greater than 1 hour
DATE TIME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
See Attachments See Attachments
TOTAL 0
Planned events less than or equal to 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
12/1/2020 0729-0739 208 Not required for events <= 1 hr Not required for events <= 1 hr
12/8/2020 0455-0500 110
TOTAL 318
Planned events greater than 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
See Attachments See Attachments
TOTAL 0
TOTAL
Unplanned Events < 1 Hour 0
Unplanned Events > 1 Hour 0
Planned Events < 1 hour and not 318
exceeding 5,000 MCF
Planned Events > 1 hour or 0
exceeding 5,000 MCF
Pilot Purge 35,599
Assist 0
TOTAL FLARED VOLUME 35,917