Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAboutPBU FS1 - BP and Hilcorp
%43Jessie L. ChmielowskiDigitally signed by Jessie L. Chmielowski Date: 2021.09.16 07:50:41 -08'00'
2. Facility Name
PBU FS 1
Percent
99.95%
0.05%
MCF
19. Remarks:
(346) 237-2244 Date 8/17/2020
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signature Title Production Analyst
Note: All volumes must be corrected
to pressure of 14.65 psia and to a
temperature of 60o F. Authority 20
AAC25.235.Printed Name Tommy Hoang Phone
Date
MCF
15. NGL Gas Equivalent 0
Conservation MCF
16. Purchased gas 0 Waste:
17. Transferred from: CGF 166,232
18. Transferred to: (Express as a negative #) CGF & CCP -55,357,240 Commissioner
13. Other (see instructions)0 Official Use Only
Authorization >1 hr:Safety MCF
14. TOTAL VOLUME (ITEMS 6-12)709,100
Lease Use
12. Fuel gas used in lease operations.580,981
10. Pilot and Purge 34,495
11. Assist Gas 81,482
9. Flared or vented more than 1 hour (see instr.)0
PUT RIVER SOUTH LOBE 640182
8. Flared or vented 1 hour or less 12,142
0290000028 PBU - EOA HILCORP July-2020
Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold 0 Pool Name Pool Code
7. Reinjected 0 PRUDHOE 640150
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number 3. Field 4. Operator 5. Month/Year of Disposition
Tommy Hoang
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
HILCORP ALASKA
PRUDHOE BAY UNIT - FS-1
GAS FLARING AND VENTING INCIDENT REPORT
July 2020
Unplanned events less than or equal to 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
7/24/2020 1622-1656 4,228 Not required for events <= 1 hr Not required for events <= 1 hr
7/26/2020 1200-1230 2,850
7/26/2020 1434-1522 5,064
TOTAL 12,142
Unplanned events greater than 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
See Attachments See Attachments
TOTAL 0
Planned events less than or equal to 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
Not required for events <= 1 hr Not required for events <= 1 hr
TOTAL 0
Planned events greater than 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
See Attachments See Attachments
TOTAL 0
TOTAL
Unplanned Events < 1 Hour 12,142
Unplanned Events > 1 Hour 0
Planned Events < 1 hour and not 0
exceeding 5,000 MCF
Planned Events > 1 hour or 0
exceeding 5,000 MCF
Pilot Purge 34,495
Assist 81,482
TOTAL FLARED VOLUME 128,119
2. Facility NamePBU FS 1Percent99.96%0.04%MCF19. Remarks:-52,556,823Commissioner(346) 237-2244 Date 9/17/2020I hereby certify that the foregoing is true and correct to the best of my knowledge.SignatureTommy HoangTitleProduction AnalystNote: All volumes must be correctedto pressure of 14.65 psia and to atemperature of 60o F. Authority 20AAC25.235.Printed NameTommy HoangPhone12. Fuel gas used in lease operations.588,233DateMCF15. NGL Gas Equivalent0ConservationMCF16. Purchased gas0Waste:17. Transferred from: CGF158,94718. Transferred to: (Express as a negative #) CGF & CCP13. Other (see instructions)0Official Use OnlyAuthorization >1 hr:SafetyMCF14. TOTAL VOLUME (ITEMS 6-12)706,843Lease Use11. Assist Gas82,7589. Flared or vented more than 1 hour (see instr.)2,35010. Pilot and Purge33,502PUT RIVER SOUTH LOBE 6401828. Flared or vented 1 hour or less00290000028 PBU - EOA BP August-2020Disposition Volume MCF20.For production from multiple pools, list contribution of each pool as a percent ofTotal Volume.6. Sold0Pool Name Pool Code7. Reinjected0PRUDHOE 640150STATE OF ALASKAALASKA OIL AND GAS CONSERVATION COMMISSIONFACILITY REPORT OF PRODUCED GAS DISPOSITION1. Facility Number 3. Field 4. Operator 5. Month/Year of DispositionForm 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate'65Jessie L. ChmielowskiDigitally signed by Jessie L. Chmielowski Date: 2021.09.16 08:05:32 -08'00'
HILCORP ALASKAPRUDHOE BAY UNIT - FS-1GAS FLARING AND VENTING INCIDENT REPORTAugust 2020Unplanned events less than or equal to 1 hourDATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSENot required for events <= 1 hr Not required for events <= 1 hrTOTAL 0Unplanned events greater than 1 hourDATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE8/11/2020 1747-2020 800 See Attachments See Attachments8/12/2020 1200-0120 400TOTAL1,200Planned events less than or equal to 1 hourDATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSENot required for events <= 1 hr Not required for events <= 1 hrTOTAL0Planned events greater than 1 hourDATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE8/9/2020 1200-1400 600 See Attachments See Attachments8/11/2020 0245-0527 550TOTAL1,150 TOTALUnplanned Events < 1 Hour 0Unplanned Events > 1 Hour 1,200Planned Events < 1 hour and not 0exceeding 5,000 MCFPlanned Events > 1 hour or 1,150exceeding 5,000 MCFPilot Purge 33,502Assist 82,758TOTAL FLARED VOLUME 118,610
Flare Start Date 08/01/2020
Flare End Date 08/31/2020
FS1 Flare Report Total Volume (MSCF) 2350
Report
Number System Date Start Time Stop Time Duration Intermittent Black Smoke Planned Reported By Volume
20-154 Flare Relief 08/09/2020 12:00:00 pm 2:00:00 pm 120 min No No Yes HEC-HOU\CA4
579
600
Planned flare event to depressurize the Annex for maintenance.Determination Cause
Completed depressuring.Action Taken
Daily Volume (MSCF)600
20-158 Flare Relief 08/11/2020 2:45:00 am 5:27:00 am 162 min No No Yes HEC-HOU\CA4
579
550
Depressurize DS02 for maintenanceDetermination Cause
Completed depressuring.Action Taken
20-158 Flare Relief 08/11/2020 5:47:00 pm 8:20:00 pm 153 min No No No HEC-HOU\CA4
579
800
STV-IP T\C 1825 shutdown due to a problem associated with UnknownDetermination Cause
Loaded STV/IP T/C.Action Taken
Daily Volume (MSCF)1350
20-160 Flare Relief 08/12/2020 12:00:00 am 1:20:00 am 80 min No No No HEC-HOU\CA4
579
400
STV-IP T\C 1825 shutdown due to a problem associated with UnknownDetermination Cause
Loaded STV/IP T/C.Action Taken
Daily Volume (MSCF) 400
Total Volume (MSCF) 2350
Generated 09/04/2020 12:14:32PM Pa ge 3 of 8
2. Facility Name
PBU FS 1
Percent
100.00%
0.00%
MCF
19. Remarks:
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number 3. Field 4. Operator 5. Month/Year of Disposition
0290000028 PBU - EOA HILCORP September-2020
Disposition Volume MCF 20.For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold 0 Pool Name Pool Code
7. Reinjected 0 PRUDHOE 640150
PUT RIVER SOUTH LOBE 640182
8. Flared or vented 1 hour or less 275
9. Flared or vented more than 1 hour (see instr.)0
10. Pilot and Purge 33,844
11. Assist Gas 80,454
13. Other (see instructions)0 Official Use Only
Authorization >1 hr:Safety MCF
14. TOTAL VOLUME (ITEMS 6-12)686,424
Lease Use
12. Fuel gas used in lease operations.571,851
Date
MCF
15. NGL Gas Equivalent 0
Conservation MCF
16. Purchased gas 0 Waste:
17. Transferred from: CGF 170,000
18. Transferred to: (Express as a negative #) CGF & CCP -57,633,049 Commissioner
(346) 237-2244 Date 10/14/2020
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signature Tommy Hoang Title Production Analyst
Note: All volumes must be corrected
to pressure of 14.65 psia and to a
temperature of 60o F. Authority 20
AAC25.235.Printed Name Tommy Hoang Phone
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
HILCORP ALASKA
PRUDHOE BAY UNIT - FS-1
GAS FLARING AND VENTING INCIDENT REPORT
September 2020
Unplanned events less than or equal to 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
Not required for events <= 1 hr Not required for events <= 1 hr
TOTAL 0
Unplanned events greater than 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
See Attachments See Attachments
TOTAL 0
Planned events less than or equal to 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
9/6/2020 2300-2356 275 Not required for events <= 1 hr Not required for events <= 1 hr
TOTAL 275
Planned events greater than 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
See Attachments See Attachments
TOTAL 0
TOTAL
Unplanned Events < 1 Hour 0
Unplanned Events > 1 Hour 0
Planned Events < 1 hour and not 275
exceeding 5,000 MCF
Planned Events > 1 hour or 0
exceeding 5,000 MCF
Pilot Purge 33,844
Assist 80,454
TOTAL FLARED VOLUME 114,573
2. Facility NamePBU FS 1Percent100.00%0.00%MCF19. Remarks:STATE OF ALASKAALASKA OIL AND GAS CONSERVATION COMMISSIONFACILITY REPORT OF PRODUCED GAS DISPOSITION1. Facility Number 3. Field 4. Operator 5. Month/Year of Disposition0290000028 PBU - EOA HILCORP October-2020Disposition Volume MCF20.For production from multiple pools, list contribution of each pool as a percent ofTotal Volume.6. Sold0Pool Name Pool Code7. Reinjected0PRUDHOE 640150PUT RIVER SOUTH LOBE 6401828. Flared or vented 1 hour or less1,0069. Flared or vented more than 1 hour (see instr.)3,60910. Pilot and Purge35,25211. Assist Gas83,26813. Other (see instructions)0Official Use OnlyAuthorization >1 hr:SafetyMCF14. TOTAL VOLUME (ITEMS 6-12)730,571Lease Use12. Fuel gas used in lease operations.607,436DateMCF15. NGL Gas Equivalent0ConservationMCF16. Purchased gas0Waste:17. Transferred from: CGF182,49718. Transferred to: (Express as a negative #) CGF & CCP-66,182,547Commissioner(346) 237-2244 Date 11/13/2020I hereby certify that the foregoing is true and correct to the best of my knowledge.SignatureTommy HoangTitleProduction AnalystNote: All volumes must be correctedto pressure of 14.65 psia and to atemperature of 60o F. Authority 20AAC25.235.Printed NameTommy HoangPhoneForm 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate'65Jessie L. ChmielowskiDigitally signed by Jessie L. Chmielowski Date: 2021.09.16 08:17:09 -08'00'
HILCORP ALASKAPRUDHOE BAY UNIT - FS-1GAS FLARING AND VENTING INCIDENT REPORTOctober 2020Unplanned events less than or equal to 1 hourDATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSENot required for events <= 1 hr Not required for events <= 1 hrTOTAL 0Unplanned events greater than 1 hourDATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSESee Attachments See AttachmentsTOTAL0Planned events less than or equal to 1 hourDATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE10/3/2020 1230-1330 409 Not required for events <= 1 hr Not required for events <= 1 hr10/15/2020 0200-0250 34710/16/2020 1400-1500 250TOTAL1,006Planned events greater than 1 hourDATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE10/15/2020 0310-0530 972 See Attachments See Attachments10/15/2020 1435-1545 24310/16/2020 1200-0545 2,394TOTAL3,609 TOTALUnplanned Events < 1 Hour 0Unplanned Events > 1 Hour 0Planned Events < 1 hour and not 1,006exceeding 5,000 MCFPlanned Events > 1 hour or 3,609exceeding 5,000 MCFPilot Purge 35,252Assist 83,268TOTAL FLARED VOLUME 123,135
!"##$!
))#
!=#>$
% *
-
%"
#
*
-,
3)
?( #
?## #
;)
)+
%"
#
)
)+
> ) #) #
!=#> $#
% #*
-
%"
#
*
-,
<
) #=!8)-
(
2. Facility Name
PBU FS 1
Percent
100.00%
0.00%
MCF
19. Remarks:
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number 3. Field 4. Operator 5. Month/Year of Disposition
0290000028 PBU - EOA Hilcorp North Slope, LLC November-2020
Disposition Volume MCF 20.For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold 0 Pool Name Pool Code
7. Reinjected 0 PRUDHOE 640150
PUT RIVER SOUTH LOBE 640182
8. Flared or vented 1 hour or less 0
9. Flared or vented more than 1 hour (see instr.)0
10. Pilot and Purge 34,492
11. Assist Gas 73,800
13. Other (see instructions)0 Official Use Only
Authorization >1 hr:Safety MCF
14. TOTAL VOLUME (ITEMS 6-12)716,678
Lease Use
12. Fuel gas used in lease operations.608,386
Date
MCF
15. NGL Gas Equivalent 0
Conservation MCF
16. Purchased gas 0 Waste:
17. Transferred from: CGF 188,566
18. Transferred to: (Express as a negative #) CGF & CCP -65,629,386 Commissioner
(346) 237-2244 Date 12/16/2020
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signature Tommy Hoang Title Production Analyst
Note: All volumes must be corrected
to pressure of 14.65 psia and to a
temperature of 60o F. Authority 20
AAC25.235.Printed Name Tommy Hoang Phone
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
HILCORP ALASKA
PRUDHOE BAY UNIT - FS-1
GAS FLARING AND VENTING INCIDENT REPORT
November 2020
Unplanned events less than or equal to 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
Not required for events <= 1 hr Not required for events <= 1 hr
TOTAL 0
Unplanned events greater than 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
See Attachments See Attachments
TOTAL 0
Planned events less than or equal to 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
Not required for events <= 1 hr Not required for events <= 1 hr
TOTAL 0
Planned events greater than 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
See Attachments See Attachments
TOTAL 0
TOTAL
Unplanned Events < 1 Hour 0
Unplanned Events > 1 Hour 0
Planned Events < 1 hour and not 0
exceeding 5,000 MCF
Planned Events > 1 hour or 0
exceeding 5,000 MCF
Pilot Purge 34,492
Assist 73,800
TOTAL FLARED VOLUME 108,292
)DFLOLW\1DPH3%8)63HUFHQW0&) 5HPDUNV&RPPLVVLRQHU 'DWH ,KHUHE\FHUWLI\WKDWWKHIRUHJRLQJLVWUXHDQGFRUUHFWWRWKHEHVWRIP\NQRZOHGJH6LJQDWXUHTommy Hoang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essie L. ChmielowskiDigitally signed by Jessie L. Chmielowski Date: 2021.09.16 08:23:38 -08'00'
HILCORP ALASKAPRUDHOE BAY UNIT - FS-1GAS FLARING AND VENTING INCIDENT REPORTDecember 2020Unplanned events less than or equal to 1 hourDATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSENot required for events <= 1 hr Not required for events <= 1 hrTOTAL 0Unplanned events greater than 1 hourDATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE12/24/2020 0800-0930 21,875 See Attachments See AttachmentsTOTAL21,875Planned events less than or equal to 1 hourDATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE12/16/2020 0814-0854 8,333 Not required for events <= 1 hr Not required for events <= 1 hrTOTAL8,333Planned events greater than 1 hourDATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSESee Attachments See AttachmentsTOTAL0 TOTALUnplanned Events < 1 Hour 0Unplanned Events > 1 Hour 21,875Planned Events < 1 hour and not 8,333exceeding 5,000 MCFPlanned Events > 1 hour or 0exceeding 5,000 MCFPilot Purge 35,888Assist 73,419TOTAL FLARED VOLUME 139,515
!"##$!
'$
8
5 ! "$ $
/!,, ",
*,+0'$
$ 5
-*>*'$ )
6
-
)
)%
($
% $
.
$ *,+0$<.?
-+$$
%
(
$.
-
%"
#
/$&0%
1#+'2",
7
$
3 !,4#*$)
53