Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAboutPBU FS1 - BP and Hilcorp %43Jessie L. ChmielowskiDigitally signed by Jessie L. Chmielowski Date: 2021.09.16 07:50:41 -08'00' 2. Facility Name PBU FS 1 Percent 99.95% 0.05% MCF 19. Remarks: (346) 237-2244 Date 8/17/2020 I hereby certify that the foregoing is true and correct to the best of my knowledge. Signature Title Production Analyst Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60o F. Authority 20 AAC25.235.Printed Name Tommy Hoang Phone Date MCF 15. NGL Gas Equivalent 0 Conservation MCF 16. Purchased gas 0 Waste: 17. Transferred from: CGF 166,232 18. Transferred to: (Express as a negative #) CGF & CCP -55,357,240 Commissioner 13. Other (see instructions)0 Official Use Only Authorization >1 hr:Safety MCF 14. TOTAL VOLUME (ITEMS 6-12)709,100 Lease Use 12. Fuel gas used in lease operations.580,981 10. Pilot and Purge 34,495 11. Assist Gas 81,482 9. Flared or vented more than 1 hour (see instr.)0 PUT RIVER SOUTH LOBE 640182 8. Flared or vented 1 hour or less 12,142 0290000028 PBU - EOA HILCORP July-2020 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 0 Pool Name Pool Code 7. Reinjected 0 PRUDHOE 640150 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 3. Field 4. Operator 5. Month/Year of Disposition Tommy Hoang Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate HILCORP ALASKA PRUDHOE BAY UNIT - FS-1 GAS FLARING AND VENTING INCIDENT REPORT July 2020 Unplanned events less than or equal to 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 7/24/2020 1622-1656 4,228 Not required for events <= 1 hr Not required for events <= 1 hr 7/26/2020 1200-1230 2,850 7/26/2020 1434-1522 5,064 TOTAL 12,142 Unplanned events greater than 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE See Attachments See Attachments TOTAL 0 Planned events less than or equal to 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE Not required for events <= 1 hr Not required for events <= 1 hr TOTAL 0 Planned events greater than 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE See Attachments See Attachments TOTAL 0 TOTAL Unplanned Events < 1 Hour 12,142 Unplanned Events > 1 Hour 0 Planned Events < 1 hour and not 0 exceeding 5,000 MCF Planned Events > 1 hour or 0 exceeding 5,000 MCF Pilot Purge 34,495 Assist 81,482 TOTAL FLARED VOLUME 128,119 2. Facility NamePBU FS 1Percent99.96%0.04%MCF19. Remarks:-52,556,823Commissioner(346) 237-2244 Date 9/17/2020I hereby certify that the foregoing is true and correct to the best of my knowledge.SignatureTommy HoangTitleProduction AnalystNote: All volumes must be correctedto pressure of 14.65 psia and to atemperature of 60o F. Authority 20AAC25.235.Printed NameTommy HoangPhone12. Fuel gas used in lease operations.588,233DateMCF15. NGL Gas Equivalent0ConservationMCF16. Purchased gas0Waste:17. Transferred from: CGF158,94718. Transferred to: (Express as a negative #) CGF & CCP13. Other (see instructions)0Official Use OnlyAuthorization >1 hr:SafetyMCF14. TOTAL VOLUME (ITEMS 6-12)706,843Lease Use11. Assist Gas82,7589. Flared or vented more than 1 hour (see instr.)2,35010. Pilot and Purge33,502PUT RIVER SOUTH LOBE 6401828. Flared or vented 1 hour or less00290000028 PBU - EOA BP August-2020Disposition Volume MCF20.For production from multiple pools, list contribution of each pool as a percent ofTotal Volume.6. Sold0Pool Name Pool Code7. Reinjected0PRUDHOE 640150STATE OF ALASKAALASKA OIL AND GAS CONSERVATION COMMISSIONFACILITY REPORT OF PRODUCED GAS DISPOSITION1. Facility Number 3. Field 4. Operator 5. Month/Year of DispositionForm 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate'65Jessie L. ChmielowskiDigitally signed by Jessie L. Chmielowski Date: 2021.09.16 08:05:32 -08'00' HILCORP ALASKAPRUDHOE BAY UNIT - FS-1GAS FLARING AND VENTING INCIDENT REPORTAugust 2020Unplanned events less than or equal to 1 hourDATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSENot required for events <= 1 hr Not required for events <= 1 hrTOTAL 0Unplanned events greater than 1 hourDATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE8/11/2020 1747-2020 800 See Attachments See Attachments8/12/2020 1200-0120 400TOTAL1,200Planned events less than or equal to 1 hourDATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSENot required for events <= 1 hr Not required for events <= 1 hrTOTAL0Planned events greater than 1 hourDATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE8/9/2020 1200-1400 600 See Attachments See Attachments8/11/2020 0245-0527 550TOTAL1,150 TOTALUnplanned Events < 1 Hour 0Unplanned Events > 1 Hour 1,200Planned Events < 1 hour and not 0exceeding 5,000 MCFPlanned Events > 1 hour or 1,150exceeding 5,000 MCFPilot Purge 33,502Assist 82,758TOTAL FLARED VOLUME 118,610 Flare Start Date 08/01/2020 Flare End Date 08/31/2020 FS1 Flare Report Total Volume (MSCF) 2350 Report Number System Date Start Time Stop Time Duration Intermittent Black Smoke Planned Reported By Volume 20-154 Flare Relief 08/09/2020 12:00:00 pm 2:00:00 pm 120 min No No Yes HEC-HOU\CA4 579 600 Planned flare event to depressurize the Annex for maintenance.Determination Cause Completed depressuring.Action Taken Daily Volume (MSCF)600 20-158 Flare Relief 08/11/2020 2:45:00 am 5:27:00 am 162 min No No Yes HEC-HOU\CA4 579 550 Depressurize DS02 for maintenanceDetermination Cause Completed depressuring.Action Taken 20-158 Flare Relief 08/11/2020 5:47:00 pm 8:20:00 pm 153 min No No No HEC-HOU\CA4 579 800 STV-IP T\C 1825 shutdown due to a problem associated with UnknownDetermination Cause Loaded STV/IP T/C.Action Taken Daily Volume (MSCF)1350 20-160 Flare Relief 08/12/2020 12:00:00 am 1:20:00 am 80 min No No No HEC-HOU\CA4 579 400 STV-IP T\C 1825 shutdown due to a problem associated with UnknownDetermination Cause Loaded STV/IP T/C.Action Taken Daily Volume (MSCF) 400 Total Volume (MSCF) 2350 Generated 09/04/2020 12:14:32PM Pa ge 3 of 8 2. Facility Name PBU FS 1 Percent 100.00% 0.00% MCF 19. Remarks: STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 3. Field 4. Operator 5. Month/Year of Disposition 0290000028 PBU - EOA HILCORP September-2020 Disposition Volume MCF 20.For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 0 Pool Name Pool Code 7. Reinjected 0 PRUDHOE 640150 PUT RIVER SOUTH LOBE 640182 8. Flared or vented 1 hour or less 275 9. Flared or vented more than 1 hour (see instr.)0 10. Pilot and Purge 33,844 11. Assist Gas 80,454 13. Other (see instructions)0 Official Use Only Authorization >1 hr:Safety MCF 14. TOTAL VOLUME (ITEMS 6-12)686,424 Lease Use 12. Fuel gas used in lease operations.571,851 Date MCF 15. NGL Gas Equivalent 0 Conservation MCF 16. Purchased gas 0 Waste: 17. Transferred from: CGF 170,000 18. Transferred to: (Express as a negative #) CGF & CCP -57,633,049 Commissioner (346) 237-2244 Date 10/14/2020 I hereby certify that the foregoing is true and correct to the best of my knowledge. Signature Tommy Hoang Title Production Analyst Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60o F. Authority 20 AAC25.235.Printed Name Tommy Hoang Phone Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate HILCORP ALASKA PRUDHOE BAY UNIT - FS-1 GAS FLARING AND VENTING INCIDENT REPORT September 2020 Unplanned events less than or equal to 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE Not required for events <= 1 hr Not required for events <= 1 hr TOTAL 0 Unplanned events greater than 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE See Attachments See Attachments TOTAL 0 Planned events less than or equal to 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 9/6/2020 2300-2356 275 Not required for events <= 1 hr Not required for events <= 1 hr TOTAL 275 Planned events greater than 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE See Attachments See Attachments TOTAL 0 TOTAL Unplanned Events < 1 Hour 0 Unplanned Events > 1 Hour 0 Planned Events < 1 hour and not 275 exceeding 5,000 MCF Planned Events > 1 hour or 0 exceeding 5,000 MCF Pilot Purge 33,844 Assist 80,454 TOTAL FLARED VOLUME 114,573 2. Facility NamePBU FS 1Percent100.00%0.00%MCF19. Remarks:STATE OF ALASKAALASKA OIL AND GAS CONSERVATION COMMISSIONFACILITY REPORT OF PRODUCED GAS DISPOSITION1. Facility Number 3. Field 4. Operator 5. Month/Year of Disposition0290000028 PBU - EOA HILCORP October-2020Disposition Volume MCF20.For production from multiple pools, list contribution of each pool as a percent ofTotal Volume.6. Sold0Pool Name Pool Code7. Reinjected0PRUDHOE 640150PUT RIVER SOUTH LOBE 6401828. Flared or vented 1 hour or less1,0069. Flared or vented more than 1 hour (see instr.)3,60910. Pilot and Purge35,25211. Assist Gas83,26813. Other (see instructions)0Official Use OnlyAuthorization >1 hr:SafetyMCF14. TOTAL VOLUME (ITEMS 6-12)730,571Lease Use12. Fuel gas used in lease operations.607,436DateMCF15. NGL Gas Equivalent0ConservationMCF16. Purchased gas0Waste:17. Transferred from: CGF182,49718. Transferred to: (Express as a negative #) CGF & CCP-66,182,547Commissioner(346) 237-2244 Date 11/13/2020I hereby certify that the foregoing is true and correct to the best of my knowledge.SignatureTommy HoangTitleProduction AnalystNote: All volumes must be correctedto pressure of 14.65 psia and to atemperature of 60o F. Authority 20AAC25.235.Printed NameTommy HoangPhoneForm 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate'65Jessie L. ChmielowskiDigitally signed by Jessie L. Chmielowski Date: 2021.09.16 08:17:09 -08'00' HILCORP ALASKAPRUDHOE BAY UNIT - FS-1GAS FLARING AND VENTING INCIDENT REPORTOctober 2020Unplanned events less than or equal to 1 hourDATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSENot required for events <= 1 hr Not required for events <= 1 hrTOTAL 0Unplanned events greater than 1 hourDATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSESee Attachments See AttachmentsTOTAL0Planned events less than or equal to 1 hourDATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE10/3/2020 1230-1330 409 Not required for events <= 1 hr Not required for events <= 1 hr10/15/2020 0200-0250 34710/16/2020 1400-1500 250TOTAL1,006Planned events greater than 1 hourDATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE10/15/2020 0310-0530 972 See Attachments See Attachments10/15/2020 1435-1545 24310/16/2020 1200-0545 2,394TOTAL3,609 TOTALUnplanned Events < 1 Hour 0Unplanned Events > 1 Hour 0Planned Events < 1 hour and not 1,006exceeding 5,000 MCFPlanned Events > 1 hour or 3,609exceeding 5,000 MCFPilot Purge 35,252Assist 83,268TOTAL FLARED VOLUME 123,135                 !"##$   !      ))#      !=#>$   %  *  - %"  #    *  -,  3) ?(   #          ?## #   ;)  )+ %"  #   )  )+      > ) #) #         !=#> $#   % # *  - %"  #    *  -, <  )  #=!8)- ( 2. Facility Name PBU FS 1 Percent 100.00% 0.00% MCF 19. Remarks: STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 3. Field 4. Operator 5. Month/Year of Disposition 0290000028 PBU - EOA Hilcorp North Slope, LLC November-2020 Disposition Volume MCF 20.For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 0 Pool Name Pool Code 7. Reinjected 0 PRUDHOE 640150 PUT RIVER SOUTH LOBE 640182 8. Flared or vented 1 hour or less 0 9. Flared or vented more than 1 hour (see instr.)0 10. Pilot and Purge 34,492 11. Assist Gas 73,800 13. Other (see instructions)0 Official Use Only Authorization >1 hr:Safety MCF 14. TOTAL VOLUME (ITEMS 6-12)716,678 Lease Use 12. Fuel gas used in lease operations.608,386 Date MCF 15. NGL Gas Equivalent 0 Conservation MCF 16. Purchased gas 0 Waste: 17. Transferred from: CGF 188,566 18. Transferred to: (Express as a negative #) CGF & CCP -65,629,386 Commissioner (346) 237-2244 Date 12/16/2020 I hereby certify that the foregoing is true and correct to the best of my knowledge. Signature Tommy Hoang Title Production Analyst Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60o F. Authority 20 AAC25.235.Printed Name Tommy Hoang Phone Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate HILCORP ALASKA PRUDHOE BAY UNIT - FS-1 GAS FLARING AND VENTING INCIDENT REPORT November 2020 Unplanned events less than or equal to 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE Not required for events <= 1 hr Not required for events <= 1 hr TOTAL 0 Unplanned events greater than 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE See Attachments See Attachments TOTAL 0 Planned events less than or equal to 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE Not required for events <= 1 hr Not required for events <= 1 hr TOTAL 0 Planned events greater than 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE See Attachments See Attachments TOTAL 0 TOTAL Unplanned Events < 1 Hour 0 Unplanned Events > 1 Hour 0 Planned Events < 1 hour and not 0 exceeding 5,000 MCF Planned Events > 1 hour or 0 exceeding 5,000 MCF Pilot Purge 34,492 Assist 73,800 TOTAL FLARED VOLUME 108,292  )DFLOLW\1DPH3%8)63HUFHQW0&) 5HPDUNV&RPPLVVLRQHU 'DWH ,KHUHE\FHUWLI\WKDWWKHIRUHJRLQJLVWUXHDQGFRUUHFWWRWKHEHVWRIP\NQRZOHGJH6LJQDWXUHTommy Hoang7LWOH3URGXFWLRQ$QDO\VW1RWH$OOYROXPHVPXVWEHFRUUHFWHGWRSUHVVXUHRISVLDDQGWRDWHPSHUDWXUHRIR)$XWKRULW\$$&3ULQWHG1DPH7RPP\+RDQJ3KRQH )XHOJDVXVHGLQOHDVHRSHUDWLRQV'DWH0&) 1*/*DV(TXLYDOHQW&RQVHUYDWLRQ0&) 3XUFKDVHGJDV:DVWH 7UDQVIHUUHGIURP&*) 7UDQVIHUUHGWR ([SUHVVDVDQHJDWLYH &*) &&3 2WKHU VHHLQVWUXFWLRQV 2IILFLDO8VH2QO\$XWKRUL]DWLRQ!KU6DIHW\0&) 727$/92/80( ,7(06 /HDVH8VH $VVLVW*DV )ODUHGRUYHQWHGPRUHWKDQKRXU VHHLQVWU  3LORWDQG3XUJH3875,9(56287+/2%(  )ODUHGRUYHQWHGKRXURUOHVV 3%8(2$ +,/&2531257+6/23( 'HFHPEHU'LVSRVLWLRQ 9ROXPH0&))RUSURGXFWLRQIURPPXOWLSOHSRROVOLVWFRQWULEXWLRQRIHDFKSRRODVDSHUFHQWRI7RWDO9ROXPH 6ROG3RRO1DPH 3RRO&RGH 5HLQMHFWHG358'+2( 67$7(2)$/$6.$$/$6.$2,/$1'*$6&216(59$7,21&200,66,21)$&,/,7<5(32572)352'8&('*$6',6326,7,21 )DFLOLW\1XPEHU  )LHOG  2SHUDWRU  0RQWK<HDURI'LVSRVLWLRQ)RUP5HY ,16758&7,216215(9(56(6,'( 6XEPLWLQ'XSOLFDWH'65Jessie L. ChmielowskiDigitally signed by Jessie L. Chmielowski Date: 2021.09.16 08:23:38 -08'00' HILCORP ALASKAPRUDHOE BAY UNIT - FS-1GAS FLARING AND VENTING INCIDENT REPORTDecember 2020Unplanned events less than or equal to 1 hourDATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSENot required for events <= 1 hr Not required for events <= 1 hrTOTAL 0Unplanned events greater than 1 hourDATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE12/24/2020 0800-0930 21,875 See Attachments See AttachmentsTOTAL21,875Planned events less than or equal to 1 hourDATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE12/16/2020 0814-0854 8,333 Not required for events <= 1 hr Not required for events <= 1 hrTOTAL8,333Planned events greater than 1 hourDATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSESee Attachments See AttachmentsTOTAL0 TOTALUnplanned Events < 1 Hour 0Unplanned Events > 1 Hour 21,875Planned Events < 1 hour and not 8,333exceeding 5,000 MCFPlanned Events > 1 hour or 0exceeding 5,000 MCFPilot Purge 35,888Assist 73,419TOTAL FLARED VOLUME 139,515                  !"##$   !  ' $ 8  5 ! "$ $       /!,, ",   *,+0'$ $  5 -*>*' $  ) 6 -  )  )%    ($ % $   .  $ *,+0$< .?  -+ $$   %  ( $.  - %"  # /$ &0 % 1#+'2",  7 $ 3 !,4#*$) 53