Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAboutPBU GC3 - BP and Hilcorp
%43Jessie L. ChmielowskiDigitally signed by Jessie L. Chmielowski Date: 2021.09.16 07:55:48 -08'00'
2. Facility Name
PBU GC 3
Percent
100.00%
MCF
19. Remarks:
(346) 237-2244 Date 8/17/2020
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signature Title Production Analyst
Note: All volumes must be corrected
to pressure of 14.65 psia and to a
temperature of 60o F. Authority 20
AAC25.235.Printed Name Tommy Hoang Phone
Date
MCF
15. NGL Gas Equivalent 0
Conservation MCF
16. Purchased gas 0 Waste:
17. Transferred from: 0
18. Transferred to: (Express as a negative #) CGF -24,903,229 Commissioner
13. Other (see instructions)0 Official Use Only
Authorization >1 hr:Safety MCF
14. TOTAL VOLUME (ITEMS 6-12)553,532
Lease Use
12. Fuel gas used in lease operations.532,215
10. Pilot and Purge 20,367
11. Assist Gas 0
9. Flared or vented more than 1 hour (see instr.)0
8. Flared or vented 1 hour or less 950
0290000033 PBU - WOA HILCORP July-2020
Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold 0 Pool Name Pool Code
7. Reinjected 0 PRUDHOE 640150
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number 3. Field 4. Operator 5. Month/Year of Disposition
Tommy Hoang
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
HILCORP ALASKA
PRUDHOE BAY UNIT - GC-3
GAS FLARING AND VENTING INCIDENT REPORT
July 2020
Unplanned events less than or equal to 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
7/5/2020 1200-1220 950 Not required for events <= 1 hr Not required for events <= 1 hr
TOTAL 950
Unplanned events greater than 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
See Attachments See Attachments
TOTAL 0
Planned events less than or equal to 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
Not required for events <= 1 hr Not required for events <= 1 hr
TOTAL 0
Planned events greater than 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
See Attachments See Attachments
TOTAL 0
TOTAL
Unplanned Events < 1 Hour 950
Unplanned Events > 1 Hour 0
Planned Events < 1 hour and not 0
exceeding 5,000 MCF
Planned Events > 1 hour or 0
exceeding 5,000 MCF
Pilot Purge 20,367
Assist 0
TOTAL FLARED VOLUME 21,317
2. Facility Name
PBU GC 3
Percent
100.00%
MCF
19. Remarks:
-24,388,363 Commissioner
(346) 237-2244 Date 9/17/2020
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signature Tommy Hoang Title Production Analyst
Note: All volumes must be corrected
to pressure of 14.65 psia and to a
temperature of 60o F. Authority 20
AAC25.235.Printed Name Tommy Hoang Phone
12. Fuel gas used in lease operations.529,847
Date
MCF
15. NGL Gas Equivalent 0
Conservation MCF
16. Purchased gas 0 Waste:
17. Transferred from:0
18. Transferred to: (Express as a negative #) CGF
13. Other (see instructions)0 Official Use Only
Authorization >1 hr:Safety MCF
14. TOTAL VOLUME (ITEMS 6-12)554,115
Lease Use
11. Assist Gas 0
9. Flared or vented more than 1 hour (see instr.)0
10. Pilot and Purge 24,268
8. Flared or vented 1 hour or less 0
0290000033 PBU - WOA BP August-2020
Disposition Volume MCF 20.For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold 0 Pool Name Pool Code
7. Reinjected 0 PRUDHOE 640150
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number 3. Field 4. Operator 5. Month/Year of Disposition
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
HILCORP ALASKA
PRUDHOE BAY UNIT - GC-3
GAS FLARING AND VENTING INCIDENT REPORT
August 2020
Unplanned events less than or equal to 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
Not required for events <= 1 hr Not required for events <= 1 hr
TOTAL 0
Unplanned events greater than 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
See Attachments See Attachments
TOTAL 0
Planned events less than or equal to 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
Not required for events <= 1 hr Not required for events <= 1 hr
TOTAL 0
Planned events greater than 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
See Attachments See Attachments
TOTAL 0
TOTAL
Unplanned Events < 1 Hour 0
Unplanned Events > 1 Hour 0
Planned Events < 1 hour and not 0
exceeding 5,000 MCF
Planned Events > 1 hour or 0
exceeding 5,000 MCF
Pilot Purge 24,268
Assist 0
TOTAL FLARED VOLUME 24,268
2. Facility Name
PBU GC 3
Percent
100.00%
MCF
19. Remarks:
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number 3. Field 4. Operator 5. Month/Year of Disposition
0290000033 PBU - WOA HILCORP September-2020
Disposition Volume MCF 20.For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold 0 Pool Name Pool Code
7. Reinjected 0 PRUDHOE 640150
8. Flared or vented 1 hour or less 0
9. Flared or vented more than 1 hour (see instr.)0
10. Pilot and Purge 19,128
11. Assist Gas 0
13. Other (see instructions)0 Official Use Only
Authorization >1 hr:Safety MCF
14. TOTAL VOLUME (ITEMS 6-12)513,982
Lease Use
12. Fuel gas used in lease operations.494,854
Date
MCF
15. NGL Gas Equivalent 0
Conservation MCF
16. Purchased gas 0 Waste:
17. Transferred from:0
18. Transferred to: (Express as a negative #) CGF -25,272,359 Commissioner
(346) 237-2244 Date 10/14/2020
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signature Tommy Hoang Title Production Analyst
Note: All volumes must be corrected
to pressure of 14.65 psia and to a
temperature of 60o F. Authority 20
AAC25.235.Printed Name Tommy Hoang Phone
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
HILCORP ALASKA
PRUDHOE BAY UNIT - GC-3
GAS FLARING AND VENTING INCIDENT REPORT
September 2020
Unplanned events less than or equal to 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
Not required for events <= 1 hr Not required for events <= 1 hr
TOTAL 0
Unplanned events greater than 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
See Attachments See Attachments
TOTAL 0
Planned events less than or equal to 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
Not required for events <= 1 hr Not required for events <= 1 hr
TOTAL 0
Planned events greater than 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
See Attachments See Attachments
TOTAL 0
TOTAL
Unplanned Events < 1 Hour 0
Unplanned Events > 1 Hour 0
Planned Events < 1 hour and not 0
exceeding 5,000 MCF
Planned Events > 1 hour or 0
exceeding 5,000 MCF
Pilot Purge 19,128
Assist 0
TOTAL FLARED VOLUME 19,128
2. Facility Name
PBU GC 3
Percent
100.00%
MCF
19. Remarks:
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number 3. Field 4. Operator 5. Month/Year of Disposition
0290000033 PBU - WOA HILCORP October-2020
Disposition Volume MCF 20.For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold 0 Pool Name Pool Code
7. Reinjected 0 PRUDHOE 640150
8. Flared or vented 1 hour or less 0
9. Flared or vented more than 1 hour (see instr.)0
10. Pilot and Purge 18,129
11. Assist Gas 0
13. Other (see instructions)0 Official Use Only
Authorization >1 hr:Safety MCF
14. TOTAL VOLUME (ITEMS 6-12)573,310
Lease Use
12. Fuel gas used in lease operations.555,181
Date
MCF
15. NGL Gas Equivalent 0
Conservation MCF
16. Purchased gas 0 Waste:
17. Transferred from:0
18. Transferred to: (Express as a negative #) CGF -27,319,457 Commissioner
(346) 237-2244 Date 11/13/2020
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signature Tommy Hoang Title Production Analyst
Note: All volumes must be corrected
to pressure of 14.65 psia and to a
temperature of 60o F. Authority 20
AAC25.235.Printed Name Tommy Hoang Phone
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
HILCORP ALASKA
PRUDHOE BAY UNIT - GC-3
GAS FLARING AND VENTING INCIDENT REPORT
October 2020
Unplanned events less than or equal to 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
Not required for events <= 1 hr Not required for events <= 1 hr
TOTAL 0
Unplanned events greater than 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
See Attachments See Attachments
TOTAL 0
Planned events less than or equal to 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
Not required for events <= 1 hr Not required for events <= 1 hr
TOTAL 0
Planned events greater than 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
See Attachments See Attachments
TOTAL 0
TOTAL
Unplanned Events < 1 Hour 0
Unplanned Events > 1 Hour 0
Planned Events < 1 hour and not 0
exceeding 5,000 MCF
Planned Events > 1 hour or 0
exceeding 5,000 MCF
Pilot Purge 18,129
Assist 0
TOTAL FLARED VOLUME 18,129
2. Facility Name
PBU GC 3
Percent
100.00%
MCF
19. Remarks:
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number 3. Field 4. Operator 5. Month/Year of Disposition
0290000033 PBU - WOA Hilcorp North Slope, LLC November-2020
Disposition Volume MCF 20.For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold 0 Pool Name Pool Code
7. Reinjected 0 PRUDHOE 640150
8. Flared or vented 1 hour or less 0
9. Flared or vented more than 1 hour (see instr.)0
10. Pilot and Purge 17,969
11. Assist Gas 0
13. Other (see instructions)0 Official Use Only
Authorization >1 hr:Safety MCF
14. TOTAL VOLUME (ITEMS 6-12)558,874
Lease Use
12. Fuel gas used in lease operations.540,905
Date
MCF
15. NGL Gas Equivalent 0
Conservation MCF
16. Purchased gas 0 Waste:
17. Transferred from:0
18. Transferred to: (Express as a negative #) CGF -26,843,655 Commissioner
(346) 237-2244 Date 12/16/2020
I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signature Tommy Hoang Title Production Analyst
Note: All volumes must be corrected
to pressure of 14.65 psia and to a
temperature of 60o F. Authority 20
AAC25.235.Printed Name Tommy Hoang Phone
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
HILCORP ALASKA
PRUDHOE BAY UNIT - GC-3
GAS FLARING AND VENTING INCIDENT REPORT
November 2020
Unplanned events less than or equal to 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
Not required for events <= 1 hr Not required for events <= 1 hr
TOTAL 0
Unplanned events greater than 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
See Attachments See Attachments
TOTAL 0
Planned events less than or equal to 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
Not required for events <= 1 hr Not required for events <= 1 hr
TOTAL 0
Planned events greater than 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE
See Attachments See Attachments
TOTAL 0
TOTAL
Unplanned Events < 1 Hour 0
Unplanned Events > 1 Hour 0
Planned Events < 1 hour and not 0
exceeding 5,000 MCF
Planned Events > 1 hour or 0
exceeding 5,000 MCF
Pilot Purge 17,969
Assist 0
TOTAL FLARED VOLUME 17,969
)DFLOLW\1DPH3%8*&3HUFHQW0&) 5HPDUNV&RPPLVVLRQHU 'DWH ,KHUHE\FHUWLI\WKDWWKHIRUHJRLQJLVWUXHDQGFRUUHFWWRWKHEHVWRIP\NQRZOHGJH6LJQDWXUHTommy Hoang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essie L. ChmielowskiDigitally signed by Jessie L. Chmielowski Date: 2021.09.16 08:23:48 -08'00'
HILCORP ALASKAPRUDHOE BAY UNIT - GC-3GAS FLARING AND VENTING INCIDENT REPORTDecember 2020Unplanned events less than or equal to 1 hourDATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSENot required for events <= 1 hr Not required for events <= 1 hrTOTAL 0Unplanned events greater than 1 hourDATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE12/16/2020 2233-0000 4,950 See Attachments See AttachmentsTOTAL4,950Planned events less than or equal to 1 hourDATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSENot required for events <= 1 hr Not required for events <= 1 hrTOTAL0Planned events greater than 1 hourDATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSESee Attachments See AttachmentsTOTAL0 TOTALUnplanned Events < 1 Hour 0Unplanned Events > 1 Hour 4,950Planned Events < 1 hour and not 0exceeding 5,000 MCFPlanned Events > 1 hour or 0exceeding 5,000 MCFPilot Purge 22,542Assist 0TOTAL FLARED VOLUME 27,492
),+'
!"## $ !
'$
8
5 3 $ " /4!,,!,
@*+.($)
*+0B$5% .
-
*.%
$
$ *+0.
$.$
%
(
5
(
)(
$*+0B=
5$ )$
(
-%"
#
/$&0%
1#+'2 !,
),+'
7
$
3 !,4#*$)
353