Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
HOME
EVENTS
DATA
Data List
Drilling
Production
Orders
Data Miner
Document Search
REPORTS
Reports and Charts
Pool Statistics
FORMS
LINKS
Links
Test Notification
Data Requests
Regulations
Industry Guidance Bulletins
How to Apply
ABOUT US
History
Staff
HELP
Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
212-131
7. Property Designation (Lease Number): 1. Operations Performed: 2. Operator Name: 3. Address: 4. Well Class Before Work:5. Permit to Drill Number: 6. API Number: 8. Well Name and Number: 9. Logs (List logs and submit electronic data per 20AAC25.071): 10. Field/Pool(s): Susp Well Insp Install Whipstock Mod Artificial Lift Perforate New Pool Perforate Plug Perforations Coiled Tubing Ops Other Stimulate Fracture Stimulate Alter Casing Pull Tubing Repair Well Other: Change Approved Program Operations shutdown 11. Present Well Condition Summary: Casing Length Size MD TVD Burst Collapse Exploratory Stratigraphic Development Service 14. Attachments (required per 20 AAC 25.070, 25.071, & 25.283) 16. Well Status after work: 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. OIL GAS WINJ WAG GINJ WDSPL GSTOR Suspended SPLUG Authorized Name and Digital Signature with Date: Authorized Title: Contact Name: Contact Email: Contact Phone: PBU 18-27E Pull LTP, cut tbg Hilcorp North Slope, LLC 3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 212-131 50-029-22321-05-00 13187 Surface Intermediate Liner Liner Liner 8671 3459 9033 998 1623 4496 13152 13-3/8" 9-5/8" 7" 4-1/2" 3-1/2" x 3-1/4" x 2-7/8" 8672 38 - 3497 36 - 9069 8829 - 9827 8678 - 10301 8691 - 13187 38 - 3497 36 - 8259 8110 - 8618 8011 - 8660 8020 - 8671 13152 1950 / 2260 4760 5410 7500 7820 None 3450 / 5020 6870 7240 8430 8620 8710 - 13130 4-1/2" 12.6# 13Cr85 / L-80 34 - 8684 8033 - 8672 Conductor 80 20" 38 - 118 38 - 118 1490 470 4-1/2" HES TNT , 8435 , 7836 No SSSV 8435 , 8629 7836 , 7977 Bo York Operations Manager Dave Bjork David.Bjork@hilcorp.com (907) 564-4672 PRUDHOE BAY / PRUDHOE OIL Total Depth Effective Depth measured true vertical feet feet feet feet measured true vertical measured measured feet feet feet feet measured true vertical Plugs Junk Packer Measured depth True Vertical depth feet feet Perforation depth Tubing (size, grade, measured and true vertical depth) Packers and SSSV (type, measured and true vertical depth) 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13a.Representative Daily Average Production or Injection Data Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: Subsequent to operation: 15. Well Class after work: Exploratory Development Service StratigraphicDaily Report of Well Operations Copies of Logs and Surveys Run Electronic Fracture Stimulation Data Sundry Number or N/A if C.O. Exempt: ADL 028307 34 - 8015 0 0 0 0 0 0 0 0 0 0 N/A 13b. Pools active after work:PRUDHOE OIL 4-1/2" Baker S-3 , 8629 , 7977 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS Sr Pet Eng: Sr Pet Geo: Form 10-404 Revised 10/2022 Submit in PDF format to aogcc.permitting@alaska.gov Sr Res Eng: Due Within 30 days of Operations Digitally signed by Bo York (1248) DN: cn=Bo York (1248) Date: 2025.04.17 11:39:54 - 08'00' Bo York (1248) By Grace Christianson at 2:35 pm, Apr 17, 2025 JJL 5/8/25 DSR-4/17/25 RBDMS JSB 042525 ACTIVITYDATE SUMMARY 2/28/2025 ***WELL S/I ON ARRIVAL*** RAN 4-1/2" BLB, 3.80" GAUGE RING S/D @ 8,468' MD (BRUSH JEWELRY) ***CONTINUE 3/1/25*** 2/28/2025 Travel to location, PJSM 3/1/2025 ***CONTINUE FROM 2/28/25*** LOAD TUBING W/ LRS 130 BBLS OF CRUDE SET 4-1/2" PX PLUG BODY @ 8,468' MD SET 4-1/2" BAIT SUB/GUTTED 2-1/2" JDC, PX PRONG @ 8,468' MD PULLED RK-OGLV FROM ST #3 @ 5,078' MD PULLED RK-LGLV FROM ST #4 @ 3,012' MD SET RK-DGLV IN ST #4 @ 3,012' MD SET RK-FLOWSLEEVE IN ST #3 @ 5,078' MD LRS CIRCULATED 420 BBLS CRUDE LRS PERFORMED A FAILING COMBO TO 3000 PSI LRS PERFORMED PASSING COMBO CMIT- TXIA TO 3109 PSI PULL STA.# 3 RK-FLOWSLEEVE @ 5,078' MD ***CONTINUE 3/2/25*** 3/1/2025 T/I/O= 2500/99/0 Assist SL Loaded tbg with 130 bbls 70* crude, worked FL ice plug on outlet well 18-06 Circ out TxIA with 420 bbls 70* crude CMIT TxIA PASSED to 3000 psi (3200 max applied) Pressured TxIA to 3200 psi with 8.3 bbls 60* crude, TxIA lost 57/54 in 1st 15 min and 19/20 in 2nd 15 min for a toatal loss of 76/74 in 30 min test. Bleed TxIA to 1000 psi. ***job continued to 03-02-25*** 3/2/2025 ***CONTINUE FROM 3/1/25*** SET RK-DGLV IN ST. # 3 @ 5,078' MD LRS PERFORMED PASSING MIT-T TO 3,000 PSI PULL BAITED PX PRONG ASSY. @ 8,468' MD PULL 4-1/2" PX PLUG @ 8468' MD RAN 3.70" LIB S/D @ 8,680' MD (corroded fish neck) WELL CONTROL DRILL w/ WSL PLANT 45KB PACKER SPEAR @ 8,680' MD JAR ON 45KB LTP @ 8,680' MD (JARRING1800# FOR 3 HOURS) ***CONTINUE 3/3/25*** ***** 45KB PACKER SPEAR (3.65" od, 31" LIH***** 3/2/2025 ***job continued from 03-01-25*** MIT-T to3000 psi (max applied 3200) Pressured tbg to 3200 psi with 1.6 bbls crude. Tbg lost 93 psi in 1st 15 min and 34 psi in second 15 min for a total loss of 127 psi in 30 min test. Bleed tbg to 2500 psi bbls Final WHP's 2500/1076/3 SL in well at departure 3/3/2025 ***CONTINUE FROM 3/2/25*** RIG DOWN POLLARD 59 ***WELL LEFT S/I*** Daily Report of Well Operations PBU 18-27E Daily Report of Well Operations PBU 18-27E 3/3/2025 ***WELL S/I ON ARRIVAL*** TRAVEL FROM ENDICOTT ***WSR CONT ON 3-4-27*** 3/4/2025 ***WSR CONT FROM 3-3-25*** ATTEMPTED TO FISH LTP FROM 8680' MD MULTI TIMES (see log) PLANTED 45KB PACKER SPEAR @ 8680' MD MULTI TIMES (see log) ATTEMPTED TO PLANT 45KB PACKER SPEAR @ 8680' MD ***WSR CONT ON 3-5-25*** 3/5/2025 ***WSR CONT FROM 3-4-25*** PLANT 4-1/2'' G-FISH NECK SPEAR @ 8680' MD JAR ON 45KB LTP @ 8680' MD (JARRING 1800# FOR 6 HRS, NO MOVEMENT) ***WELL LEFT S/I*** **** 4-1/2'' G-FISH NECK SPEAR (3.65" od, 26" LIH)**** 3/8/2025 ***WELL S/I ON ARRIVAL*** 2 RUNS W/ 3-1/2" DUMP BAILER. DUMPED 5 GALLONS OF OILSAFE ON LTP @ 8,678' MD RAN 3-1/2" GS, S/D 8,678' MD (1.5 HRS JARRING/ .160 wire) RAN 3-1/2" GS, S/D @ 8,678' MD (1 hour & 10 min.) (RECOVERED 32" OF 45KB LTP, PARTED BELOW SLIP HOUSING) (MISSING 1 ELEMENT & 3-1/2 SLIPS) ***CONTINUE 3/9/25*** Daily Report of Well Operations PBU 18-27E 3/9/2025 ***CONTINUE FROM 3/8/25*** LAY DOWN .160", PICK UP .125" RAN 3.25" CENT. IN-LINE MAGNET, 2.25" MAGNET, S/D @ 8,660' SLM RAN 3.65" OLD STYLE RELEASABLE SPEAR (2.60"-2.67" grapple) TO 8,662' SLM. RECOVERED REMAINDER OF KB PACKER & LOCATOR SUB. STINGER IS STILL IN HOLE RAN 2.70" WFD RELEASABLE SPEAR (2.30"-2.43" grapple) TO 8.666' SLM. SPEAR STRIPPED OUT OF STINGER RAN 2.70" OLD STYLE RELEASABLE SPEAR (2.30"-2.50" grapple) TO 8,666' SLM. SPEAR STRIPPED OUT RAN 2.48" CENT, DOUBLE 3" BRUSHES, 2.1" SWAGE TO 8,666' SLM, WORKED TO 8,677' SLM. NO RECOVERY RAN 2.70" BAITSUB & 1.87" BOWEN (1348 series, 2.430" grapple) TO 8,671' SLM, GOT 10 MINUTES OF JARRING BEFORE SPEAR SLIPPED OUT RAN KJ, 3' x 1-3/4", 2.48" CENT, SD @ 8,666' SLM (UNABLE TO PASS) RAN 3-1/2" GR, 3-1/2" BAIT SUB, 1.87" BOWEN (1348 series, 2.516" GRAPPLE, S/D @ 8,666' SLM RAN KJ, 2.34" CENT. 3-1/2" BLB, 1.875" IN-LINE MAGNET, ZELDA SWORD MAGNET S/D @ 8,675' SLM (NO RECOVERY) RAN 4-1/2" GR, 4-1/2" BAIT SUB, 2' X 1-7/8" STEM, 3.73" CENT. 3' X 1-7/8" STEM, BOWEN 1348 SERIES 2.43" GRAPPLE, S/D @ 8,667' SLM (JAR 10 MINUTES SHEAR GR) LAY DOWN TO TEST WLV EMERGENCY RESPONCE DRILL (leak below the wlv) ***CONTINUE 3/10/25*** 3/10/2025 ***CONTINUE FROM 3/9/25*** JARRED ON SPEARED LTP STINGER FOR 40 MIN & PARTED WIRE. LEFT ~111' OF WIRE ON A 24.42' TOOLSTRING RAN 3.01" BLINDBOX TO TOP OF TOOLSTRING @ 8,639' SLM, GOOD MARKS ON BLINDBOX MADE ONE ATTEMPT TO FISH WIRE W/OUT SUCCESS. SAT DOWN ON TOP OF TOOLSTRING RECOVERED TOOLSTRING FROM 8,639' SLM 3-1/2" GR, BAITSUB, 2' x 1-7/8", 4-1/2" BRUSH & 3.50" WIRE GRAB, SD @ 8,530' SLM (RECOVERED 121' OF .125" WIRE) RAN 4-1/2" GS, S/D @ 8,661' SLM (JAR FOR 30 MINUTES @ #1500) ***CONTINUE 3/11/25*** Daily Report of Well Operations PBU 18-27E 3/11/2025 ***CONTINUE FROM 3/10/25*** PULLED 4-1/2" BAIT SUB, 2' STEM, 3.75" SWAGE, 3' STEM, BOWEN 1.87" GRAPPLE 2.43" @ 8,661' SLM RAN 4-1/2" GR, 4-1/2" BAIT SUB, 2' STEM, 3.75" SWAGE, 3' STEM, 2.5" BOWEN SPEAR W/ 2.514" S/D @ 8,668' SLM (SHEAR GR 5 MINUTES) PULLED BAITED 2' STEM, 3.75" SWAGE, 3' STEM, 2.5" BOWEN SPEAR W/ 2.514"GRAPPLE (20 MINUTES JARRING NO RECOVERY) RAN 4-1/2" GR 4-1/2" BAIT SUB, 2' STEM, 3.75" SWAGE, 3' STEM, 2.5" BOWEN SPEAR W/ 2.514" S/D @ 8,666' SLM (SHEAR GR) RAN 4-1/2" GS. SPEAR SLIPPED OUT IN 5MIN OF JARRING RAN 2.34" CENTRALIZER. SAT DOWN @ 8,661' SLM & 8,673' SLM RAN 2.25" CENTRALIZER. SAT DOWN @ 8,661' SLM & 8,673' SLM RAN 1.90" CENTRALIZER. SAT DOWN @ 8,678' SLM RAN KJ, 3' x 1-1/4", 2.25" MAGNET, SD @ 8,664' SLM (UNABLE TO GET INTO DEPLOYMENT SLEEVE) RAN KJ, 3' x 1-1/4", 3" BRUSH, 2.34" CENT, 2.25" MAGNET, SD @ 8,664' SLM, (UNABLE TO WORK PAST) RAN DUAL 1.5" BOWSPRING CENTS, 2.25" MAGNET, S/D @ 8,664' SLM (UNABLE TO WORK PAST) RAN KJ, 1.74" CENT. 3-1/2" BLB, 2.10" SWAGE S/D @ 8,664' SLM, WORK PAST DOWN TO 8,695' SLM RAN KJ, 2.34" CENT. 3-1/2" BLB, 2.13" IN-LINE MAGNET, ZELDA SWORD MAGNET, S/D @ 8,675' SLM (UNABLE TO PASS THROUGH) ONSITE WLV TEST PER AOGCC 25.280(-post wlv use- pass) ***CONTINUE 3/12/25*** 3/12/2025 ***CONTINUE FROM 3/11/25*** FINISHED 3-1/2" BLB, IN-LINE MAGNET RUN S/D @ 8,675' SLM (NO RECOVERY) RAN KJ, 2.20" CENT. 3-1/2" BLB, 2.31" PINEAPPLE BROACH S/D @ 8,667' SLM, UNABLE TO WORK THROUGH RAN READ 24 ARM CALIPER FROM 8,700' SLM TO SURFACE. GOOD DATA THROUGH DEPLOYMENT SLEEVE. FINGERS GOT BENT UP RAN 3-1/2" BRUSH & 2.12" SWAGE. BRUSHED DPLOYMENT SLEEVE/BROKEN STINGER AREA. DRIFTED DOWN TO 9,600' SLM RAN 4-1/2" GR. ATTEMPTED TO LATCH DEPLOYMENT SLEEVE @ 8,691' MD. NO LUCK RAN BOWSPRING CENTRALIZER, 10' x 2" BAILER, BOWSPRING CENTRALIZER. NO ISSUES DOWN TO 9,610' SLM RAN REED 24 ARM CALIPER FROM 9,600' TO 8,670' (GOOD DATA) RIG DOWN & TRAVEL TO SHOP ***WELL LEFT S/I*** 3/12/2025 T/I/O = 2500/850/0 (Assist S-Line w/ Brush & Flush) RU'd to SL and stood by till TFS released. FINAL WHPS = 2500/850/0 Pollard SL in control of well upon TFS departure Daily Report of Well Operations PBU 18-27E 3/15/2025 WELL SI ON ARRIVAL*** (TUBING CUT) RIG UP YJ ELINE. PT PCE 300 PSI LOW /3000 PSI HIGH CUT TUBING @ 9607' WITH 2" RCT CCL TO CUTTER 17.7 ' CCL STOP DEPTH 9589.3'', CONFIRM CUTTER FIRED CCL CORRELATE TO LINER TIEBACK SUMMARY RDMO YJ ELINE ***WELL S/I ON DEPARTURE*** JOB COMPLETE 3/18/2025 *** WELL S/I ON ARRIVAL*** 2 ATTEMPTS TO PLANT SPEAR IN DEPLOYMENT SLEEVE @ 8,691' MD ON SECOND ATTEMPT, RECOVER 34" OF STINGER FROM LTP (~1' of stem seal body still in hole 2.48-2.52 ID) RAN 4-1/2" GR TO DEPLOYMENT SLEEVE @ 8,691' MD. NO ISSUES LATCHING ***WELL LEFT S/I ON DEPARTURE*** 3/20/2025 SLB CTU #8 1.75" CT x .156 WT Job Objective - Pull on liner to make sure its cut MIRU. Function test BOP. MU YJ fishing assembly with 4" GS. Start laoding the well. ***Job continued on 3/21/25*** 3/21/2025 SLB CTU #8 1.75" CT x .156 WT Job Objective - Pull on liner to make sure its cut Finish loading the well. RIH. Tag the liner top 8680 CTM. Pull 11K over pick up and see a weight break, Pulled 7K over afterwards. RBIH and pump off liner. Weights back to normal. POOH. RDMO. ***Job Complete*** OO By Grace Christianson at 10:23 am, Apr 01, 2025 Digitally signed by Sean McLaughlin (4311) DN: cn=Sean McLaughlin (4311) Date: 2025.03.28 16:03:43 - 08'00' Sean McLaughlin (4311) 325-185 4/7/25 SFD 4/4/2025 DSR-4/2/25JJL 4/7/25 10-407 *Variance as per 20 AAC 25.112(i): Approved for alternate abandonment plug placement on parent well contingent upon fully cemented liner on upcoming sidetrack. *Window milling on service coil not approved on 10-403, refer to sidetrack PTD for approval. *&: Jessie L. Chmielowski Digitally signed by Jessie L. Chmielowski Date: 2025.04.07 15:16:40 -08'00'04/07/25 RBDMS JSB 040825 To: Alaska Oil & Gas Conservation Commission From: Trevor Hyatt Drilling Engineer Date: March 28, 2025 Re:18-27E Sundry Request Sundry approval is requested to set a whipstock and mill a window in the 18-27E wellbore as part of the drilling and completion of the proposed 18-27F CTD lateral. Proposed plan for 18-27F Producer: Prior to drilling activities, screening will be conducted to MIT. The existing 3-1/2" liner will be cut with E-line and verified it is free (and ready to be pulled by rig) with service coil. See 18-27F PTD request for complete drilling details - A coil tubing drilling sidetrack will be drilled with the Nabors CDR2 or CDR3 rig. The rig will move in, test BOPE and kill the well. The rig will latch up to the 3-1/2" pre- cut liner and pull out of hole. A whipstock drift will be performed followed by setting a 4-1/2" packer whipstock. A dual string 3.80" window + 10' of formation will be milled out of the 4-1/2" and 7" liners. The well will kick off drilling in the Ivishak Zone 2 and lands in Zone 1. The lateral will continue in Zone 1 to TD. The proposed sidetrack will be completed with a 3-1/2"x3-1/4"x2-7/8” 13Cr solid liner, cemented in place and selectively perforated post rig (will be perforated with rig if unable to post rig). This completion will not completely isolate and abandon the parent Prudhoe Pool perfs (Sag perfs will remain open). 20 AAC 25.112(i) Variance Request: Hilcorp requests to plug the existing perforations via the liner cement job, packer whipstock and/or liner top packer, if the liner lap pressure test fails as an alternate plug placement. The following describes the work planned. A wellbore schematic of the current well and proposed sidetrack is attached for reference. Pre-Rig Work: (Estimated to start April 2025) x Reference 18-27E Sundry submitted in concert with this request for full details. 1. E-Line : Cut 3-1/2" coil at 9,610' MD 2. Fullbore : MIT-IA and/or MIT-T to 2,500 psi 3. Slickline : Bait deployment sleeve for service coil 4. Coil : Latch liner and pick up, verify liner free. Set down and release. 5. Valve Shop : Pre-CTD Tree Work 6. Operations : Remove wellhouse and level pad. Rig Work: 1. MIRU and test BOPE 250 psi low and 3,500 psi high (MASP 2,460 psi). Give AOGCC 24hr notice prior to BOPE test (install VBRs for pulling liner) 2. Pull 3-1/2" pre-cut liner from 9,610' MD and lay down 3. Drift for whipstock (swap to 3” pressure deployment rams and test) 4. Set 4-1/2" Packer Whipstock* at 9,550’ MD at 180 degrees ROHS 5. Mill 3.80” Window 6. Drill build section: 4.25" OH, ~379' (28 deg DLS planned). 7. Drill production lateral: 4.25" OH, ~1850' (12 deg DLS planned). Swap to KWF for liner. 8. Run 3-1/2” x 3-1/4” x 2-7/8” 13Cr solid liner (swap to VBRs and test prior to running liner) 9. Pump primary cement job: 32 bbls, 15.3 ppg Class G, 1.24 (ft3/sk), TOC at TOL.* 10. Only if not able to do with service coil extended perf post rig – Perforate Liner 11. Freeze protect well to a min 2,200' TVD. 12. Close in tree, RDMO. * Alternate plug placement variance request per 20 AAC 25.112(i) py completion will not completely isolate andppg(p g pg) abandon the parent Prudhoe Pool perfs (Sag perfs will remain open) Post Rig Work: 1. Valve Shop : Valve & tree work 2. Slickline : Set LTP* (if necessary). Set live GLVs. 3. Service Coil : Perforate (~1250’) - see extended perf procedure attached. 4. Testing : Portable test separator flowback. Trevor Hyatt CC: Well File Drilling Engineer Joseph Lastufka (907-223-3087) Well Date Quick Test Sub to Otis -1.1 ft Top of 7" Otis 0.0 ft Distances from top of riser Excluding quick-test sub Top of Annular 2.75 ft C L Annular 3.40 ft Bottom Annular 4.75 ft CL Blind/Shears 6.09 ft CL 2-3/8" Pipe / Slips 6.95 ft B3 B4 B1 B2 Kill Line Choke Line CL 3.0" Pipe / Slip 9.54 ft CL 2-3/8" Pipe / Slips 10.40 ft TV1 TV2 T1 T2 Flow Tee Master Master LDS IA OA LDS Ground Level 3" LP hose open ended to Flowline CDR2-AC BOP Schematic CDR2 Rig's Drip Pan Fill Line from HF2 Normally Disconnected 3" HP hose to Micromotion Hydril 7 1/16" Annular Blind/Shear 2-3/8" Pipe/Slips 2 3/8" Pipe/Slips 2 3/8" Pipe/Slips 7-1/16" 5k Mud Cross 2-3/8" Pipe/Slips 3-1/8" Pipe / Slip Well Date Quick Test Sub to Otis Top of 7" Otis Top of Annular C L Annular Bottom Annular CL Blind/Shears CL 2-3/8" Pipe / Slips B6 B5 B8 B7 Choke Line Kill Line CL 3" Pipe / Slip CL 2-3/8" Pipe / Slips TV1 TV2 T1 T2 Flow Tee Master Master LDS IA OA LDS Ground Level CDR3-AC BOP Schematic CDR3 Rig's Drip Pan Fill Line Normally Disconnected 2" HP hose to Micromotion Hydril 7 1/16" Annular Blind/Shear 2-3/8" Pipe/Slips 2 3/8" Pipe/Slips 2 3/8" Pipe/Slips 7-1/16" 5k Mud Cross 2-3/8" Pipe/Slips 3" Pipe / Slip neceeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeee Nolan Vlahovich Hilcorp Alaska, LLC Geotech 3800 Centerpoint Drive, Suite 1400 Anchorage, AK 99503 Tele: (907) 564-4558 E-mail: nolan.vlahovich@hilcorp.com Please acknowledge receipt by signing and returning one copy of this transmittal. Received By: Date: Date: 4/02/2025 To: Alaska Oil & Gas Conservation Commission Natural Resource Technician 333 W 7th Ave Suite 100 Anchorage, AK 99501 SFTP DATA TRANSMITTAL T#20250402 Well API #PTD #Log Date Log Company Log Type AOGCC E-Set# BCU 19RD 50133205790100 219188 3/20/2025 YELLOWJACKET GPT-PERF BCU 19RD 50133205790100 219188 3/16/2025 YELLOWJACKET PLUG BRU 212-26 50283201820000 220058 3/21/2025 AK E-LINE Perf BRU 212-26 50283201820000 220058 3/15/2025 AK E-LINE Perf CLU 7 50133205310000 203191 1/22/2025 YELLOWJACKET PLUG IRU 11-06 50283201300000 208184 3/20/2025 AK E-LINE Perf KALOTSA 10 50133207320000 224147 3/1/2025 YELLOWJACKET GPT-PLUG-PERF KBU 22-06Y 50133206500000 215044 1/25/2025 YELLOWJACKET GPT-PLUG-PERF KU 13-06A 50133207160000 223112 3/18/2025 AK E-LINE CIBP MPE-20A 50029225610100 204054 3/13/2025 READ CaliperSurvey MPI 1-39A 50029218270100 206187 3/4/2025 YELLOWJACKET PERF MPU C-01 50029206630000 181143 1/30/2025 YELLOWJACKET PERF MPU K-17 50029226470000 196028 2/7/2025 AK E-LINE Caliper MPU S-53 50029238110000 224159 3/7/2025 YELLOWJACKET SCBL MRU A-15RD2 50733201050200 202019 3/10/2025 AK E-LINE TubingCut PBU 18-27E 50029223210500 212131 3/15/2025 YELLOWJACKET RCT PBU B-30A 50029215420100 201105 3/7/2025 READ CaliperSurvey PBU S-10A 50029207650100 191123 11/18/2024 YELLOWJACKET CBL-TEMP PBU W-220A 50029234320100 224161 2/22/2025 YELLOWJACKET SCBL Revision explanation: Fixed API# on log and .las files Please include current contact information if different from above. T40256 T40256 T40257 T40257 T40258 T40259 T40260 T40261 T40262 T40263 T40264 T40265 T40266 T40267 T40268 T40269 T40270 T40271 T40272 PBU 18-27E 50029223210500 212131 3/15/2025 YELLOWJACKET RCT Gavin Gluyas Digitally signed by Gavin Gluyas Date: 2025.04.02 12:55:27 -08'00' New Plugback Esets 6/21/2024 Well Name API Number PTD Number ESet Number Date Kaladachabuna 2 PB1 50-283-20169-70-00 212-157 T38946 5-3-2013 Kaladachabuna 2 PB2 50-283-20169-71-00 212-157 T38947 5-3-2013 Kaladachabuna 2 PB3 50-283-20169-72-00 212-157 T38948 5-3-2013 Kaladachabuna 2 PB4 50-283-20169-73-00 212-157 T38949 5-3-2013 ODSN-18 PB1 50-703-20624-70-00 210-142 T38950 2-18-2011 ODSN-18 PB2 50-703-20624-71-00 210-142 T38951 2-18-2011 ODSN-18 PB3 50-703-20624-72-00 210-142 T38952 2-18-2011 ODSN-18 PB4 50-703-20624-73-00 210-142 T38953 2-18-2011 ODSN-18 PB5 50-703-20624-74-00 210-142 T38954 2-18-2011 ODSN-24 PB1 50-703-20662-70-00 212-178 T38955 6-13-2013 ODSN-24 PB2 50-703-20662-71-00 212-178 T38956 6-13-2013 PBU 18-27E PB2 50-029-22321-72-00 212-131 T38957 2-12-2013 PBU 18-27E PH 50-029-22321-71-00 212-131 T38958 2-12-2013 Redoubt Unit 7 PB1 50-733-20526-70-00 203-150 T38959 10-22-2003 SP18-N05 PB1 50-629-23453-70-00 211-101 T38960 7-11-2016 3K-103 PB1 50-029-23392-70-00 208-115 T38961 2-3-2009 3K-103 PB2 50-029-23392-71-00 208-115 T38962 2-3-2009 3K-103 PB3 50-029-23392-72-00 208-115 T38963 2-3-2009 3K-103 PB4 50-029-23392-73-00 208-115 T38964 2-3-2009 3K-103 PB5 50-029-23392-74-00 208-115 T38965 2-3-2009 ODSN-25 PB1 50-703-20656-70-00 212-030 T38966 8-11-2012 ODSN-25 PB2 50-703-20656-71-00 212-030 T38967 8-11-2012 ODSN-25 PB3 50-703-20656-72-00 212-030 T38968 8-11-2012 ODSN-25 PB4 50-703-20656-73-00 212-030 T38969 8-11-2012 PBU 18-27E PB2 50-029-22321-72-00 212-131 T38957 2-12-2013 PBU 18-27E PH 50-029-22321-71-00 212-131 T38958 2-12-2013 7. Property Designation (Lease Number): 1. Operations Performed: 2. Operator Name: 3. Address: 4. Well Class Before Work:5. Permit to Drill Number: 6. API Number: 8. Well Name and Number: 9. Logs (List logs and submit electronic data per 20AAC25.071):10. Field/Pool(s): Abandon Suspend Plug for Redrill Perforate New Pool Perforate Plug Perforations Re-enter Susp Well Other Stimulate Fracture Stimulate Alter Casing Pull Tubing Repair Well Other: Change Approved Program Operations shutdown 11. Present Well Condition Summary: Casing Length Size MD TVD Burst Collapse Exploratory Stratigraphic Development Service 14. Attachments (required per 20 AAC 25.070, 25.071, & 25.283) 16. Well Status after work: 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. OIL GAS WINJ WAG GINJ WDSPL GSTOR Suspended SPLUG Authorized Name and Digital Signature with Date: Authorized Title: Contact Name: Contact Email: Contact Phone: PBU 18-27E Mill CIBP Hilcorp North Slope, LLC 3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 212-131 50-029-22321-05-00 13187 Surface Intermediate Tie-Back Liner Tie-Back Liner Liner 8671 3497 9069 998 1623 4507 13152 13-3/8" 9-5/8" 7" 4-1/2" 3-1/2"x3-1/4"x2-7/8" 8672 38 - 3497 36 - 9080 8829 - 9827 8678 - 10301 8680 - 13187 38 - 3497 36 - 8265 8110 - 8618 8011 - 8660 8013 - 8671 13152 1950 / 2260 4760 5410 7500 10530/7820/11160 none 3450 / 5020 6870 7240 8430 10160/8620/10570 10961 - 13130 4-1/2" 12.6# 13-CR & L-80 32 - 8594 8692 - 8672 Conductor 80 20" 38 - 118 38 - 118 1490 470 8435 , 8629, 8680 8435 , 8629, 8680 7836 ,7978 , 8013 Bo York Operations Manager David Bjork David.Bjork@hilcorp.com (907) 564-4672 PRUDHOE BAY, PRUDHOE OIL Total Depth Effective Depth measured true vertical feet feet feet feet measured true vertical measured measured feet feet feet feet measured true vertical Plugs Junk Packer Measured depth True Vertical depth feet feet Perforation depth Tubing (size, grade, measured and true vertical depth) Packers and SSSV (type, measured and true vertical depth) 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final 13.Representative Daily Average Production or Injection Data Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: Subsequent to operation: 15. Well Class after work: Exploratory Development Service StratigraphicDaily Report of Well Operations Copies of Logs and Surveys Run Electronic Fracture Stimulation Data Sundry Number or N/A if C.O. Exempt: ADL 0028307 No SSSV 32 - 7953 7836 ,7978 , 8013 191 754 17527 21032 432 4871 0 0 365 491 N/A STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS Sr Pet Eng: Sr Pet Geo: Form 10-404 Revised 10/2021 Submit Within 30 days or Operations Sr Res Eng: 4-1/2" Baker S-3, 3-1/2" Baker 45 KB, 7" Baker S By Samantha Carlisle at 10:15 am, Nov 22, 2021 Digitally signed by Bo York DN: cn=Bo York, c=US, o=HIlcorp Alaska LLC, ou=Alaska North Slope, email=byork@hilcorp.com Date: 2021.11.22 08:02:51 -09'00' Bo York DSR-11/22/21 SFD 11/29/2021 MGR29DEC2021 SFD 11/29/2021 8710 RBDMS HEW 11/24/2021 ACTIVITYDATE SUMMARY 10/31/2021 CTU #9, 1.75" CT - 0.145" WT, 34.8bbl. Objective: Mill CIBP MIRU. Weekly BOP test, 250psi/3500psi - pass. NU BOP's. MU & RIH w/ TB 2.30" milling BHA. FP flowline. Load well w/ 1% slick KCL w/ safelube. ...In Progress... 11/1/2021 CTU #9, 1.75" CT - 0.145" WT, 34.8bbl. Objective: Mill CIBP Continue to RIH w/ TB 2.30" milling BHA. Dry tag & begin milling from 11728'. Push to TD - 13144'. POH. FP coil w/ diesel. FP well per pad op request w/ 40bbls diesel. ***Complete*** 11/1/2021 T/I/O = 540/Vac/20. Temp = 102°. IA FL (Ops request). No AL. Increased IAP using 18-06 gas from a Vac to 130 psi. OAP increased 20 psi. IA FL @ 3250' (238' below #4 Dome, 174 bbls). Final WHPs = 540/130/40. SV = C. WV, SSV, MV = O. IA, OA = OTG. 11:40 Daily Report of Well Operations PBU 18-27E Operator Name:2. Development Exploratory Service 5 Permit to Drill Number:212-131 6.50-029-22321-05-00 PRUDHOE BAY, PRUDHOE OIL Hilcorp North Slope, LLC 5. Well Name and Number:8. 10.Field/Pools: Well Class Before Work4. Present Well Condition Summary:11. Total Depth: measured feet feet Plugs measured feet feet Effective Depth: measured feet feet Packer measured feet feettrue vertical true vertical 13187 11740 8672 8435 , 8631 none 11740 7836 , 7979 Casing: Length: Size: MD: TVD: Burst: Collapse: Conductor 80 20" 38 - 118 38 - 118 1490 470 Surface 3497 13-3/8" 38 - 3497 38 - 3497 3450 / 5020 1950 / 2260 Intermediate 9069 9-5/8" 36 - 9080 36 - 8265 6870 4760 Tie-Back Liner 998 7" 8829 - 9827 8110 - 8618 7240 5410 Tie-Back Liner 1623 4-1/2" 8678 -10301 8011 - 8660 8430 7500 Perforation Depth: Measured depth: 10961 - 13130 feet True vertical depth:8692 - 8672 feet Tubing (size, grade, measured and true vertical depth)4-1/2" 12.6# 13-CR 32 - 8594 32 - 7953 8435 , 8631 7836 , 7979Packers and SSSV (type, measured and true vertical depth) 4-1/2"Baker S-3, 3-1/2" Baker 45 KB, 7" Baker S Liner 4507 3-1/2"x3-1/4"x2-7/ 8680 - 13187 8013 - 8671 10160/8620/10570 10530/7820/11160 12. Stimulation or cement squeeze summary: Intervals treated (measured): Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure 4470564229 6619794 0 6258 295 368 Representative Daily Average Production or Injection Data Prior to well operation: Subsequent to operation: 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Name: Contact Email: Dave Bjork David.Bjork@hilcorp.com Authorized Name:Bo York Authorized Title: Authorized Signature with Date:Contact Phone:(907) 564-4672 Treatment descriptions including volumes used and final pressure: 13. Operations Manager Operations Performed1. Abandon Plug Perforations Fracture Stimulate Pull Tubing GSTOR WINJ WAG GINJ SUSP SPLUG 16. Well Status after work:Oil 5 Gas Exploratory Development 5 Stratigraphic 15. Well Class after work: Service WDSPL 14. Attachments: (required per 20 AAC 25.070.25.071, & 25.283) Daily Report of Well Operations Copies of Logs and Surveys Run true vertical measured8671 Sundry Number or N/A if C.O. Exempt: 321-181 No SSSV Junk Packer Printed and Electronic Fracture Stimulation Data 5 Tubing Swap Operations shutdown Change Approved Program 5 Senior Pet Engineer:Senior Res. Engineer: STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS Suspend Perforate Other Stimulate Alter Casing Plug for Redrill Perforate New Pool Repair Well Re-enter Susp Well5 3.Address: 3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 7.Property Designation (Lease Number):ADL 0028307 PBU 18-27E 9. Logs (List logs and submit electronic and printed data per 20AAC25.071): Stratigraphic Other: API Number: Form 10-404 Revised 03/2020 Submit Within 30 days of Operations By Samantha Carlisle at 12:52 pm, Jul 15, 2021 Digitally signed by Bo York DN: cn=Bo York, c=US, o=HIlcorp Alaska LLC, ou=Alaska North Slope, email=byork@hilcorp.com Date: 2021.07.15 11:19:19 -08'00' Bo York MGR30JUL2021 SFD 7/16/2021RBDMS HEW 7/20/2021 DSR-7/15/21 ACTIVITYDATE SUMMARY 3/20/2021 T/I/O = SSV/450/vac. Temp = SI. PPPOT-T (PASS), PPPOT-IC (PASS), Pre RWO. PPPOT-T: Stung into test port (0+ psi), bled void to 0 psi. Function LDS, all moved freely. Pressured test void to 5000 psi for 30 min test, lost 150 psi in 15 min, lost 50 psi in second 15 min (PASS). Bled void to 0 psi. PPPOT-IC: Stung into test port (200 psi), bled void to 0 psi. Did not function LDS. Pressured test void to 3500 psi for 30 min test, lost 0 psi in 15 min, lost 0 psi in second 15 min (PASS). Bled void to 0 psi. SV, WV, SSV = C. MV = O. IA & OA = OTG. 09:30 4/10/2021 T/I/O=480/490/-4 temp= SI LRS unit 46 CMIT-TxIA (LEAK DETECTION LOG) Attempted CMIT-TxIA (SEE LOG) established a LLR of .18 bpm @ 1700 psi and .28 bpm @ 2000 psi. using 5 bbls of crude. SV/WV/SSV=C MV=O IA/OA=OTG Tags hung FWHP's480/480/-12 4/16/2021 T/I/O=600/550/0 ( TFS Unit 2 Assist E-Line with Leak Detection Log) Pumped 116 bbls of crude down the TBG and IA to assist E-Line with log. FW HP=1500/1450/0 E- Line still on well upon departure. 4/16/2021 ...Well shut in on arrival... (HES EL - acx ldl) LOG BASELINE FROM SURFACE TO JUST ABOVE PX PLUG AT 8,654'. THUNDERBIRD ESTABLISH LLR OF 0.25 BPM AT 2,000 PSI WITH TBG AND IA JUMPERED AT SURFACE. PERFORM STOP COUNTS ABOVE PX PLUG AND ACROSS PACKER. DETERMINE THE LEAK IS AT THE PRODUCTION PACKER AT 8,629'. ***Job Complete. Well shut in on departure.*** 4/27/2021 T/I/O=0/500/0 SI Circ-Out well to KCL (RWO EXPENSE) Pumped 870 BBLS KCL down TBG up the IA taking returns down the FL of 18-06. Pumped 172 BBLS of Diesel down IA taking returns up the TBG to 18-06 FL. U-Tube for 1 hr to freeze protect TxIA. Pumped 5 BBLS 60/40 followed by 76 BBLS crude down FL of 18-06 to Freeze Protect FL. Tags hung on WV and LV of 18-06. Tag hung on MV on 18-27 DSO/WSL notified Valve positions=SV WV SSV closed MV open CVs OTG FWHP=160/170/0 4/28/2021 ***Pollard E-Line Unit 306 / Job Scope: String Shot and Chem Cut Pre-Rig RIH WITH STRING SHOT BHA. RAN DOWN THRU THE PACKER @ 8629' AND LOGGED UP THRU GLM#1. TIE INTO TBG TALLY APRIL-1998. SHOT 9' OF 2 WRAPS OF 80 GRAIN DET CORD FROM 8575.5' - 8584.5'. POOH. RIH WITH CHEM CUTTER. CORRELATE TO TBG TALLY & CHEM CUT 4-1/2" TUBING W / 3- 5/8" CHEM CUTTER AT 8584'. GOOD WEIGHT INDICATION DURING CUT. NO PRESSURE INDICATION. T/I/O REMAINED THE SAME BEFORE & AFTER THE CUT. AT SURFACE, SEVERING HEAD SHOWED A GOOD CUT. RIG DOWN ELINE UNIT. ***JOB COMPLETE*** 4/29/2021 T/I/O=400/156/0 Temp= S/I TxIA Pressure Test to 2000 psi Failed. Pressured up T/IA to 2100/2024 psi with 14 bbls diesel. T/IA lost 400/384 psi in 5 min. Pumped 3 bbls diesel to get LLR of .15 bpm @ 2115/2052 psi. Bled T/IA to 400/350 psi. SW WV SSV= closed MV IA OA= open. Final Whp's=400/350/0 Daily Report of Well Operations PBU 18-27E Daily Report of Well Operations PBU 18-27E 5/16/2021 T/I/O = SSV/180/0. Temp = SI. OA Integrity Test to 1200 psi PASSED (Pre rig). No AL, flowline, wellhouse, scaffolding, or ladder. IA FL @ surface. OA FL @ 60' (3.5 bbls). Used 5.2 bbls Diesel to pressure OA to 1200 psi. OAP decreased 134 psi to 1066 psi during the 5 min test. No sign of leaks anywhere on the surface kit. Bled OAP to 0 psi (2.5 bbls). Bled IAP to 60 psi in 1 hr (Fluid, 7 bbls). IAP would not bleed below 60 psi. Monitored for 30 min. IAP increased 120 psi. Final WHPs = SSV/180/0. SV, WV, SSV = C. MV = O. IA, OA = OTG. 16:10 5/19/2021 ***COST PLACEHOLDER*** Shear Valve and 4 DGLV's and latches 6/22/2021 T/I/O = 950/165/50. Temp = SI. TBG & IA FL (RWO). No WH, FL, or S-riser. Drilling scaffold on well. TBG FL @ 1374' (74 bbls), IA FL @ near surface. SV, WV, SSV = C. MV = O. IA & OA = OTG. 18:00. 6/23/2021 T/I/O=0/0/0. RD Fullbore circ-out. Set 4" H CTS BPV w/ dry rod. ND 4-1/16" CIW tree & 13-5/8" 5M x 4-1/16" 5M FMC THA. Wellhead techs cut & cap C&B lines, function LDS's, install CTS plug and PT CTS assembly. NU 13-5/8" BOP's & torque to 2000 ft/lbs. Tool Service site prep. RDMO. 6/23/2021 T/I/O= 940/150/40. LRS unit 72 Circ-Out (RWO EXPENSE). Pumped 5 bbls of 60/40 MeOH, 50 bbls of FW with Baraklean, and 880 bbls of 1% KCl water into the IA while taking TBG returns to 18-05 FL (IA was fluid packed while TBG had 1375' of gas). Bled the OA as needed to stay below 1000 psi (6 times). Shut in TBG returns and performed LLRT= 0.21 bpm. Pumped 7 bbls of 1% KCl. OA lost pressure during the test. Continued to circulate well bore until UR tanks were empty. Bled OA to 0 psi. Final T/I/O= 0/0/0. 6/24/2021 TBird - 1: Continue to Rig up TB-1. Set for AOGCC witnessed BOP testing. Pre- BOP shell test. . Receive completion and tubulars. WS, TS and TB Floor hand, start strapping pipe. Review procedure for testing BOP's, WC Plan, and line up. Chk valves per Standing Orders. Set up PVT's, trip tank, and trip sheet. Test PVT alarms, calibration & set points. Test gas alarms. Perform BOPE test 250 psi low/3000psi high- AOGCC witness waived by Guy Cook. Pull TWC. Hanger pulled free @ 95K. Work up to 185K for 1 hour. Tubing not cut. Call For Eline & RCT cutter. *** In Progress *** / 6/25/2021 ***TB RIG SUPPORT*** JOB SCOPE: TBG CUT RIG UP ON THUNDERBIRD RIG. RIH W/ 2.5" RCT CUTTER. CORRELATE TO TBG TALLY 4/8/1998. CUT TUBING @ 8587' ( 3' BELOW EXISTING CHEM CUT). POOH. TOOLS LOOKED GOOD. RIG PULLED ~ 175K TO GET TBG MOVING. RELEASED FROM RIG. ***JOB COMPLETE*** 6/25/2021 TBird - 1: Continue from previouse WSR. Wait on Eline for Tubing Re-cut. RU Eline, RIH with RCT cutter. Make Cut at 8,587' (3') deeper than previous Chem Cut. Change out Landing joint. RU & Pull Hanger. Hanger free at 175K. Continue POOH with 4-1/2" IBT Tubing to the SSSV assembly. Terminate control lines. 51 bands recovered. Job continues on 6/26 Daily Report of Well Operations PBU 18-27E 6/26/2021 TBird - 1: Continue from previouse WSR: POOH with 4-1/2" completion. Verified sucessful RCT cut 3' below failed Chemical cut. Attempt to test 2-7/8" x 5-1/2" VBR's. 2-7/8" Test failed. Install Test plug, install 2-7/8" Fixed bore rams. Swap Rig tongs. PU Yellow Jacket 9-5/8" Test Packer. Wrong size Test Packer. Called For Baker Test Packer. Job continues on 6/27 6/27/2021 TBird - 1: Continue from previouse WSR: RIH with 9-5/8" Test Packer on 2-7/8" PH6 workstring. Set Packer ~8,450' MIT 9-5/8" casing to 3000 psi. POOH from 8,466'. LD BOT test packer. RU for Ram change out. Job continues on 6/28 6/28/2021 TBird - 1: Continue from previouse WSR: PJSM/Prcedure- C/O 2-7/8" Fixed rams to 2-7/8" x 5-1/2" VBRs and Test. 250 low / 3000 high Charted. - Good test. RU Torque turn equipment. Run new 4-1/2" 13Cr VAM TOP 12.6# completion, torque turned to spec. Two positive shears & stack out. Land completion over tubing stub at 8594 ft. 96k PUW, 85k SOW. . RILD. Reverse Circulate 300 bbls corrosion inhibited KCL 1% Baracore with .1% Oxygone. Packer fluid. *** job continues on WSR 6/29 6/28/2021 Standby for TBS Rig. Relased by WSL 6/29/2021 ***Assist Rig*** Pump 1.3 bbls diesel for MIT X T to 3000 psi. (PASSED) Pumped 6.6 bbls diesel for MIT X IA to 3000 psi. (PASSED) Rig in control of well at time of departure. 6/29/2021 TBird - 1: Continue from previouse WSR: . MIT-T 3215 psi (PASS) lost 10/5 psi in 15/30 mins. Final pressure 3200 psi. MIT-IA 3195 psi (PASS) 0/0 in 15/30 mins. Final pressure 3195 psi. Bleed off tubing and to open shear valve in GLM #4. Bleed T and IA to zero. Set 4" H plug. RD and Move to 18-26 Final Report for 18-27 6/29/2021 T/I/O = 0/0/0. Pull 13-5/8" BOP's. Land 13-5/8" 5M x 4-1/16" 5M FMC THA, torque flange to 1990 ft/lbs. Wellhead tech PT adapter void. Land 4-1/16" CIW tree, torque flange to 750 ft/lbs. Tie-in lateral piping and install wellhead scaffolding. PT tree to 500 psi low and 5000 psi high. Pull 4" CIW H TWC w/ dry rod. Set well shelter and install shelter flooring. RDMO. 6/30/2021 ***WELL S/I ON ARRIVAL***(post rig) PULL BALL&ROD @ 8464' SLM ***JOB CONT. 6/30/21*** 6/30/2021 T/I/O= 300/300/0 Circ-Out (Post RWO) Pressure tested flowline to 2400 psi w/ 2.2 bbls diesel. Pumped 250 bbls of ambient diesel down IA, up tubing, taking returns to 18-27 flowline. Tags hung on WV/IA. FWHP= 300/300/0. SV/WV/SSV= C, MV= O, IA/OA= OTG. Well shut in upon departure. 7/1/2021 ***JOB CONT. FROM 6/30/21***(post rig) PULL RKP-CIRC VALVE FROM STA.#4 SET RK-LGLV (16/64" tro 1500psi) PULL RK-DGLV FROM STA.#3 SET RK-OGLV (20/64" orifice) PULL RHC @ 8464' SLM UNABLE TO LATCH P-PRONG FROM PLUG BODY AT 8662'MD RAN LIB TO 8645' SLM TAKE IMPRESSION OF TOP OF P-PRONG( tbg cut impression, no prong top) ***JOB CONT. 07/2/21*** Daily Report of Well Operations PBU 18-27E 7/2/2021 ***JOB CONT. FROM 07/01/21***(post rig) BAILING FILL OFF OF P-PRONG AND PX PLUG @ 8662' MD(1/2gal fill/trash recovered) PULL P-PRONG @ 8662' MD ATTEMPT TO PULL PLUG BODY( recovered 1 ctrl line band, 2 cups fill) *** JOB CONT. 07/03/21*** 7/3/2021 *** JOB CONT. FROM 07/02/21*** ( post rig) BAIL FILL OFF OF PX PLUG @ 8662' MD( Recovered approx. 2-1/2 gals slag & misc trash / 1 ctrl line band) PULL PX PLUG BODY(5/16""ports) @ 8662' MD(plugged) ***JOB COMPLETE*** Operator Name:2. Exploratory Development Service 5 Permit to Drill Number:212-131 6.API Number:50-029-22321-05-00 PRUDHOE BAY, PRUDHOE OIL Hilcorp North Slope, LLC 5. Field/Pools:9. Well Name and Number: ADL 028307 Property Designation (Lease Number):10. 8. PBU 18-27e 7.If perforating: What Regulation or Conservation Order governs well spacing in this pool? Will planned perforations require a spacing exception? Stratigraphic Current Well Class:4. Type of Request:1.Abandon Plug Perforations Fracture Stimulate Repair Well 5 Operations shutdown Op Shutdown GAS GSTOR WAG SPLUG Abandoned Oil 5 WINJ Exploratory Development 5Stratigraphic Service WDSPL 12. Attachments: PRESENT WELL CONDITION SUMMARY 13187 Effective Depth MD: L-80 11. 5/1/2021 Commission Representative: 15. Suspended Contact Name: David Bjork Contact Email: David.Bjork@hilcorp.com Authorized Name: Bo York Authorized Title:Operations Manager Authorized Signature: Plug Integrity BOP Test Mechanical Integrity Test Location Clearance Other: Yes No Spacing Exception Required?Subsequent Form Required: Approved by:COMMISSIONER APPROVED BYTHE COMMISSION Date: OtherAlter Casing Pull Tubing Conditions of approval: Notify Commission so that a representative may witness Sundry Number: COMMISSION USE ONLY 17. I hereby certify that the foregoing is true and the procedure approved herein will not be deviated from without prior written approval. Detailed Operations Program Packers and SSSV Type: No SSSV Packers and SSSV MD (ft) and TVD (ft): Perforation Depth MD (ft):Tubing Size: Size Total Depth MD (ft):Total Depth TVD(ft): 8671 Effective Depth TVD:Plugs (MD):Junk (MD): Other Stimulate Re-enter Susp Well Suspend Plug for Redrill Perforate Perforate New Pool 8631,8680,8686 7979,8013,8017 Date: Liner 4507 3-1/2"x3-1/4"x2-7/8"8680 - 13187 8013 - 8671 10160/8620/10570 10530/7820/11160 Well Status after proposed work: 16. Verbal Approval: Change Approved Program 38 - 118 36 - 9080 36 - 8265 14. Estimated Date for Commencing Operations: BOP Sketch 38 - 3497 Conductor 7240 Proposal Summary 13. Well Class after proposed work: 4-1/2"Baker S-3, 3-1/2" Baker 45 KB, 7" Baker S 8710 - 13130 8033 - 8672 4-1/2" 12.6# L-80 34 - 8686 Tie-back Liner 8662 8001 8662 , 11740 none 38 - 3497 1950 / 2260 9-5/8" 7" Contact Phone:(907)564-4672 Date: 4/7/21 5410 3497 3450 / 5020 13-3/8"Surface 4760 GINJ 5 Post Initial Injection MIT Req'd? Yes No 5 5 Comm. STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS 20 AAC 25.280 80 20"38 - 118 470 Intermediate 9069 6870 Tie-back Liner 998 8829 - 9827 8110 - 8618 1623 4-1/2" 8678 -10301 8011 - 8660 8430 7500 Address:3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 3. No 5Yes Casing Length MD TVD Burst 1490 Tubing Grade:Tubing MD (ft):Perforation Depth TVD (ft): Collapse MPSP (psi): Wellbore Schematic 2470 Comm.Sr Pet Eng Sr Pet Geo Sr Res Eng Form 10-403 Revised 03/2020 Approved application is valid for 12 months from the date of approval. 55 By Samantha Carlisle at 10:06 am, Apr 09, 2021 321-181 Digitally signed by Bo York DN: cn=Bo York, c=US, o=HIlcorp Alaska LLC, ou=Alaska North Slope, email=byork@hilcorp.com Date: 2021.04.09 09:02:58 -08'00' Bo York SFD 4/9/2021 DSR-4/12/21 10-404 BOPE test to 3000 psi. Annular to 2500 psi. MGR15APR2021 Yesn Required? Comm 4/15/21 dts 4/15/2021 JLC 4/15/2021 RBDMS HEW 4/16/2021 RWO 18-27e PTD: 2121310 Well Name:18-27e API Number:500292232105 Current Status:Shut-In Rig:Thunderbird #1 Estimated Start Date: Estimated Duration:4 days Reg.Approval Req’std?10-403, 404 Date Reg. Approval Rec’vd:N/A Regulatory Contact:Carrie Janowski Permit to Drill Number:2121310 First Call Engineer:Dave Bjork 907-564-4672 907-440-0331 Second Call Engineer:Ryan Thompson 907-564-5280 907-301-1240 AFE Number:215-01274 IOR 140 Current Bottom Hole Pressure:3,350 psi @ 8,800’ TVD 7.4 PPGE | Offset producer 18-14c - 12/19 Max. Anticipated Surface Pressure:2,470psi (Based on 0.1 psi/ft. gas gradient) Last SI WHP:1,750 psi (Taken on 9/05/20) Min ID:2.36” ID KB packer @ 8,680’ MD Max Angle:97 Deg @ 11,055’ Brief Well Summary: 18-27 was drilled in February 1993 and sidetracked and completed as a 4 ½” monobore in 1998. Later in 1998, 2000, 2005 and 2012 it was coil sidetracked to the current bottom hole location. In Feb 2016 the toe perfs were isolated and Z1A heel perfs were added with great result. The well produced until 2020 when a tubing leak was identified. A caliper indicated it is not worth patching. We will now pursue a RWO to replace the L-80 tubing. Objective: Pull the existing 4 ½” L80 tubing out of the well and replace with 13 chrome tubing. Achieve a passing MIT-IA & MIT-T. Pre RWO work: DHD – MIT OA – 1200 psi CMIT-TxIA to 3,000-psi, run eline LDL if failing. Cycle LDS’s PPPOT-T PPPOT-IC EL – LDL if necessary Cut tubing @ ~ 8,649’ Circulate well to 1% KCL w/ diesel FP on T & IA DHD - Bleed WHP’s to 0 Proposed RWO Procedure: 1. MIRU Thunderbird #1 Rig. 2. Circulate KWF as necessary and bleed pressure to 0. 3. Set TWC 4. ND tree. 5-1-2021 00 SFD 4/9/2021 and tubing head adapter. ~8,589' MD RWO 18-27e PTD: 2121310 5. NU BOPE configured top down, Annular, 2-7/8” x 5-1/2” VBRs, Blinds and integral flow cross. Test BOPE to 250psi Low/3000psi High, annular to 250psi Low/2500psi High (hold each ram/valve and test for 5-min). Record accumulator pre-charge pressures and chart tests. A. Perform Test per Thunderbird #1 BOP test procedure. B. Notify AOGCC 24 hrs in advance of BOP test. C. Confirm test pressures per the Sundry Conditions of approval. D. Test the 2-7/8” x 5-1/2” VBR’s with 4 ½” and 2-7/8” test joints. Test the Annular preventer with a 2-7/8” test joint. E. Submit to AOGCC completed 10-424 form within 5 days of BOPE test. 6. Pull TWC 7. Pull 4 1/2” tubing 8. Run 4 ½” tubing with stacker packer completion 9. Land Hanger 10. Drop ball and rod. 11. Set Packer. 12. Perform MIT-T to 3000 psi and MIT-IA to 3000 psi. 13. Shear valve and circulate FP fluid. 14. Set TWC 15. ND BOPE 16. NU tree and tubing head adapter. 17. Test both tree and tubing hanger void to 500psi low/5,000psi high. 18. Pull TWC 19. Rig down Thunderbird #1. Post rig Slickline Work 1. Pull Ball and rod and RHC profile 2. Set GLV’s per GL Engineer 3. RDMO & pop well Attachments: 1. Wellbore Schematic 2. Proposed Wellbore Schematic 3. BOP Drawing MITs to be 30 minute charted test. From Schematic: Completion to include (from bottom up) - Nonsealing overshot, X - nipple, 4-1/2" X 9-5/8" packer, X -nipple -Space out tubing and GLMS to surface, X - Nipple below BOPF. GLMs - dummied w/ 1 shear valve RWO 18-27e PTD: 2121310 Wellbore Schematic RWO 18-27e PTD: 2121310 Proposed Wellbore Schematic Tubing cut ~8,589'MD RWO 18-27e PTD: 2121310 RWO BOPs MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission TO: Jim Regg.�DATE: 6/26/2021 P. I. Supervisor FROM: Guy Cook SUBJECT: BOPE Test — VBR Test Failure Petroleum Inspector PBU 18-27E , Thunderbird Rig 1 Hilcorp North Slope LLC. PTD 2121310;-Sundry321-181 6/26/2021: Arrived at location and spoke with the Company Representative Jay Murphy about the failed 2 7/8" tests on their last BOP test on 6/24/21. They had two failures with two different 2 7/8" x 5 '/2" VBRs. The rams tested on the 4 '/2" test joint so they left in the VBRs and moved forward planning to test the 2 7/8" again after pulling the 4 '/2" tubing out of the well. Once they were ready, testing started. The hydraulic pressure on the rams currently was 1700 psi. The first attempt to get a 250 -psi low pressure test failed. There was a leaking needle valve that was part of the issue, but at the time was assumed it was the only leak. On the second attempt to get a good 250 psi low test, the leak was still present so it was decided to bump up the hydraulic control pressure on the ram to see if the VBRs would seal. The control pressure was increased to 1900 psi. The pressure on the VBRs was bumped back up to 300 psi and got a good five-minute low test. Then proceeded up to 3200 psi for the high test and the VBRs leaked immediately and the pressure fell off rapidly. The pressure was bled to zero and the hydraulic control pressure on the rams was increased to 2200 psi, proceeded to the high-pressure test and the pressure continued to bleed off. It was decided by Jay Murphy that the VBRs would be removed and a set of 2 7/8" solid rams would be installed. He told me this same issue had happened on the last well (PBU Z-11) and that this is how they were able to proceed. I left location but instructed Mr. Murphy to send me a picture of the chart after they test the 2 7/8" solid rams, before they proceeded with the workover. Attachments: Test Chart 2021-0626_BOP_Hilcorp_Thunderbird 1 _V BR-Test-Fail_gc.docx Page 1 of 2 Hilcorp Thunderbird 1 — VBR Test Failure Test Chart Photo by AOGCC Inspector G. Cook 6/26/2021 2021-0626_BOP Hilcorp_Thunderbirdl_VBR-Test-Fail_gc.docx Page 2 of 2 STATE OF ALASKA ASKA OIL AND GAS CONSERVATION COMMIS REPORT OF SUNDRY WELL OPERATIO 1. Operations Performed Abandon 0 Plug Perforations Q Fracture Stimulate 0 Pull Tubing 0 Operations shutdown 0 Suspend 0 Perforate Q Other Stimulate 0 Alter Casing 0 Change Approved Program 0 Plug for Redrill 0 Perforate New Pool 0 Repair Well 0 Re-enter Susp Well 0 Other: ,SC7' e/13P 12 vn- 2. Operator Name: BP Exploration(Alaska),Inc 4. Well Class Before Work 5. Permit to Drill Number: 212-131 3. Address: P.O.Box 196612 Anchorage, Development Q Exploratory 0 AK 99519-6612 Stratigraphic 0 Service ❑ 6. API Number: 50-029-22321-05-00 7. Property Designation(Lease Number): ADL 0028307 8. Well Name and Number: PBU 18-27E 9. Logs(List logs and submit electronic and printed data per 20AAC25.071): 10. Field/Pools: PRUDHOE BAY,PRUDHOE OIL 11.Present Well Condition Summary: Total Depth: measured 13187 feet Plugs measured 11740 feet RECEIVED true vertical 8671 feet Junk measured feet MAR 0 7 2016 Effective Depth: measured 11740 feet Packer measured 8631 feet I true vertical 8672 feet Packer true vertical 7979.27 feet OGCC Casing: Length: Size: MD: TVD: Burst: Collapse: Structural Conductor 80 20"91.5#H-40 38-118 38-118 1490 470 Surface See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Intermediate 9044 9-5/8"47#L-80 36-9080 36-8265 6870 4760 Production Liner See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Perforation Depth: Measured depth: 10961 -10991 feet 10991-11021 feet 11021-11051 feet 11051-11081 feet 11800-11870 feet 11900-11980 feet 12040-12490 feet 12770-12980 feet 13040-13130 feet True vertical depth: 8692-8694 feet feet 8694-8696 feet 8696-8697 feet 8697-8696 feet 8674-8677 feet 8676-8678 feet 8677-8675 feet 8675-8676 feet 8673-8672 feet Tubing(size,grade,measured and true vertical depth) 4-1/2"12.6#L-80 34-8686 34-8017 Packers and SSSV(type,measured and See Attachment See Attachment See Attachment true vertical depth) 12.Stimulation or cement squeeze summary: �y y� Intervals treated(measured): 'CAAlrif^16i 1/ a I,I t; Treatment descriptions including volumes used and final pressure: A16� 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation: 540 40927 103 1057 Subsequent to operation: Shut-In 14.Attachments:(required per 20 AAC 25.070.25.071,&25.283) 15.Well Class after work: Daily Report of Well Operations Q Exploratory 0 Development Q Service 0 Stratigraphic 0 Copies of Logs and Surveys Run 0 16.Well Status after work: Oil Q Gas 0 WDSPL 0 Printed and Electronic Fracture Stimulation Data 0 GSTOR ❑ WINJ 0 WAG 0 GINJ 0 SUSP 0 SPLUG 0 17.I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O.Exempt: N/A Contact Catron,Garry R(Wipro) Email Garry.Catron@bp.com Printed Name Catron,Garry R(Wipro) Title PDC Principal Engineer Signature Phone +1 907 564 4424 Date 3/3/16 rT L 4 7�y Form 10-404 Revised 5/2015 3/0 /l/ RBDMS w MAR 0 9 2016 Submit Original Only it / v • • CD O CN 0 � T O W Nr T- cyCO o o U 00008000NCD CD 1.11 N N- M Cf N ul M m r M CO CP O 0000 N- O CO O OD r � M CC) N O 0) N T- '- N- 00 N O CO 'r CO F CO N- N- T- T N CC) N O CO CC) C0 CO O F e- M CO CO CO 00 CO CO CO CO M M M T- N T- CO CO N CO r- •- w CO N- Tr M co M O O T- U) CC) VD M co 00 00 OD OD OD cl) CID OD Cq U) O CNP OM ONOCj CO M 0) 0) 0) 0) CO co w Q N N O O Tr O N O 00 00 CO CO OD M N N- re, d' M M Cq M CO CO CO VD CO M 2)CO OD OD 00 CD 0) im r z co L 0 0 0 0 0 O O O 0OO i 0000000 z Y J J J J J J J = w4* OODDOD is, M -- ZMepLo (C). N Nto. COCONI. cNi4tCA• CP• CO � v- - O bp ao0 N (V cr 00 - V - M M N _ CV p I i F rNr - NCn F0) C7 4 M M N 4 J= _ T- CD 01 of O Tr 0 Tr N O N CO 00C c0 03 C[) CD 01 C0) O (F N F O J W C C,O c wW as WcCeece0 c D Z Z r W W W W W W W m 0 Z ZZ ZZ ZD 0 Cn U) Z J J J J J J 1— • • Packers and SSV's Attachment PBU 18-27E SW Name Type MD TVD Depscription 18-27E TBG PACKER 8631.34 7979.27 4-1/2" Baker S-3 Perm Packer 18-27E PACKER 8680.26 8012.94 3-1/2" Baker 45 KB Packer 18-27E PACKER 8686.36 8017.06 7" Baker ZXP Top Packer 18-27E PACKER 8842.33 8118.06 7" Baker S Packer • . ..-- c o co m X Lo cricc.�° o- = p � m � m ca U) = U _, - Y o) 3 ao a) c) XXX a) 0 ao ca ca 12 � � � JD o°)CD,- E oU = _ = 0 CO J O V 7 0) p) 0)co d am Q • 0 � a) EEE O co S CO LO 4-. 0 0 0 N CO CD 1- ' N 0_ a a o 0 N- 02_ � 'a 000 CD v O 'J O O O J o) 0 N N N LL a) aii EU s cocoo (0 0 _ a 't Q v � b � � ;' � � w co 0 0 = a a (COoi aa) aaa > N a) a U) U) U) 0 m cc a aM -F-- 0 a) co co co _ E W .... 0 a) to I 1 1 N E a) L. Q Co U N .c U) = Co Cl) U) X 0 0- 0 _ 0. 2 m cr a) � o_D 0 . = = = a) M cr) ~ O Wu0 w .- p2Q-N a) 0 _ -o m o 1., — co 0) 2L = .— NNN 13 J CD N Co U M J O 3 0 ce ) p X X X < U) L_ 03 o) - > '� •..7., w -0 a) MMC° ,> s J L.L. .? 6. tOa) a- � � � c) ,..- O m H a) p a) p0a 333 a) rn t m > • a) * ' 0 aO o > .0 o O d i U) ° 0 * v 0E- M Q � * o 0 0 0 * co a) 00 • 0. = ii o .•:--- c y a) w11 , , .— � in � � ce O .o p c � � cam p � 0 O � 4 •- m E O . M to c) t OU • , _ i- ; 4, N 00 �+ c a) C.) � � O o) = = NCC) N0 . N ,_ •� U N H C co. �' O Cop Y p O V 0 O 0 M W' Q ,_ m * o D 0)L` Ca api v a ,-• >> ,- ,-1 . � * �U * m Ch • Cn y N H p '- E ru O v> N Ca N Cn •p Ca : in rn rn . C� Cn o o p v p �._ o aa) aa)i aaa) rn U o N a) c° 00 0 N N Cr) O U am N c c c p c Q ca — a- c o _ 0 � Som p p = � � = � -o -oa. . 6 -p E co c C Nip �� . C13- 1- U E Q c c,� c :? a) a) c c� Y o a) cei p v) ° 0 < 4* c 3 0 = v 0 0 % c al co m jo 4t C m j O +� c O O O O O O O a) I- . * s 9 V2 000HU � 0.00 S a) OH * a) ate) ate) * HV a) * NI- m UQ « CO HU) QU « .ted — cn -o0 : dda : 0 : ax COa w H 0 co CO CO CO CO r r o N >- N co N co m V' N co \ \ N M N N N N 0 Q TREE= 4-1/16"FMC �.>R=-- BAKER C FAC • I 8-2 7 E ** L� AS WELL SIGN�Ow It1WT @i dOKB ELEV= 50.90' 982T.ST''B","C'&"D'NOT SHOWN BELOW (iEF BEY=:-- - 53.3T' MILLOUT•10301'1' BF 8..E/= _ - 17.63' KOP= 4000' • 2223' -14-112"CAMCO BAL-O SSS/N,D=3.812" Max Angle= 97"@ 11055' GAS LFT MANDRELS Datum MD= WA Datum TVD= m__. 8800'SS ST AID TVD DEV TYFE VLV LATCH PORT DATE 1 2986 2986 1 MMG DOME RK 16 10/29/12 13-3/8"CSG,68#,L-80 BTD,D=12.415" H 3497" 2 5308 5198 28 A81AG SO RK 20 10/29112 1 3 7260 6898 29 MNG t&W FK 0 08/18/05 4 8439 7839 42 MNG (Me' RK 0 08/18/05 Minimum ID =2.36" @ 8680' ► 9— 8629' -I9-5/8"X 4-1/2"BKR S-3 RCR,D=3.875" 4-112" KB LNR TOP PKR I I 8882' -14-lir HESXN',D=3.813" TOP OF 4-1/2"LNR -I 8678' 8678' H BKR TEBK SLV,13=7.50"(MIND LNR) 4-1/2"TBG,12.6#,L-80,.0152 bpf,D=3.958" --I 8684' I g 8680' -H4-1P2"KB LNR TOP PKR,D=2.360' $684' ---14-1/2"WLEG,D=3.958"(886110 LNR) 9-518"X 7"BKR ZXP PKR,D=6.30" H 86$4` ►�4y .� BEHIND 8891' --13.70"DEPLOY SLV,D=3.00" CT LNR 9-5/8"X 7"BKR HMC LNR HGR,D=6.25' -I 8692' 8707' _-13-112"HES X NP,D=2.813' 7'X4-1/2"XO,D=3.937' 8699' i 8829' IHTOP OF TNN TEBACK SLEEVE =' BEHIND 8838' -19-5/8'X7"MA/9-6 PKR CT LNR 9-5/8"CSG,47#,L-80 MRS,D=8.681" H 9069' , 8842' J-{9-5/8"x r TNV DTH-S LNR HGR. 9204' H4-1/2"HES X NP,D=3.813" 3-1/2"LNR,9.3#,L-80 STL,.0087 bpf,D=2.992" -{ 9618' 9618' H3-1/2"X 2-7/8",D=2.377" 9620' H3.70"DEPLOY SLV,D=3.00" 3-1/2"LNR,9.3#,L-80 STL,.0087 bpf,113=2.992" H 9672' --------I 9672' H3-1/2-X 3-3/16"XO,D=2.786" 7"LNR,26#,NT80 NSCC,.0383 bpf,D=6.276" H -9827 I- 14-1/2"WFPSTOCK(10/09/12) -j 10300' 7"MLLOUT WINDOW(18-27A)9827"-9850' 4-112a"LW;12.6#,L-80 BT,.0158 bpf,D=3.958" -{ -10300' + 10008' H4-1/2'HES X NP,D=3.813"(MIND LNR) I I 4-1/2'MLLOUT WINDOW(18-27E)10301'-10310' FE ORATION SUIVIMARY ' REF LOG:SIB MCINL ON 10/22/12 ANGLEAT TOP FGF:86"g, 10961' ' Note:Refer to Production DB for historical perf data SIZE 1 SWI MHi.VAL I Opn/Sqz 11( SHOT I SQZ _ 11698' -13-3/16"X 2-7/8"XO,D=2.377" 11 -SEE PAGE 2 FOR PERF SRY- I 11740' H2-7/8"CIBP(02/01/16). I I 1 I I I 3-1/4"LNR,6.6#,L-80 STL,.0079,D=2.85" -J 11698' I MID H 13152' ,,t. 12-7/8"LM ,6.5#,L-80 STL,.0058,D=2.441" ,-I 1318T DATE REV BY COM VE N TS I DATE REV BY CX)MtAB'fTS PRt1DHOE BAY UNIT 02/23/93 D-9 INITIAL COM PLETBON 1 11/06/12 PJC/AD DWG CORRECTIONS VV13L- 18.27E 04/11/98 D-9 SIDETRACK (18-27A) 01/07/13 JU PJC DRAWING REFORMIkT P834T 2121310 11/01/98 N-CDR1 CTD SIDETRACK (18-27131 02/15/16 SM/.MO SET CIBP/ADFERFS(02/1-3/16) AR No: 50-029-22321-05 10/18/00 N-CDR1 CTD SIDETRACK (18-27C) 02/26/16 GC/JMD UPDATB)REF BEV SEC 24,T11 N,R14E 893'FNL&236'FEL 09/28/05 NORDICI CTD SIDETRACK(18-27D) 10/26/12 NOREIC1 CTD SIDETRACK(1$.27E) BP Exploration(Alaska) • 18-27E S C r � n PERFORATION SUMMARY REF LOG:SLB M( L ON 10/22/12 AN(aLEATTOP PERF:86°@ 10961' Note:Refer to Production DB for historical perf data SIZE SPF INTERVAL Opn/Sgz SHOT SQZ 3-3/8" 6 8710-8750 C 03/21/05 2" 6 10961-10991 0 02/03/16 I I 2' 6 10991-11021 0 02/02/16 2' 6 11021-11051 0 02/02/16 2' 6 11051-11081 0 02/02/16 I j 2' 6 11800-11870 C 10+23/12 2" 6 11900-11980 C 10/23/12 2' 6 12040-12490 C 1(/23/12 r 6 12770-12980 C 10/23/12 2" 6 13040-13130 C 10/23112 DATE REV BY COM/ERIS DATE REV BY COMMIS PR1./0HOE BAY LNT 02/23/93 0.9 NATIAL COMPLETBON 11/06/12 PJCIJl4D DWG CORRECTIONS VVEI.L: 18-27E 04/11/98 019 SIDETRACK (18-27A) 01/07/13 JL/PJC DRAWING FST PERA : 2121310 11/01198 $CDR1 CTO SIDETRACK(18-278) 02/15/16 SJVV/JM)SET CBRADPF3FS(02/1-3/16) AR Pb: 50-029-22321-05 10/18/00 t4-CDR1 CTD SIDETRACK (18-27C) 02/26/16 GC/J143 UPDATED FIEF BEV SEC 24,T11N,R14E,893'FAIL&236'FEL 09/28/05 NOIiDIC1 CTD SIDETRACK(18-27t 10126/12 NOROIC1'CTD SIDETRACK(18-27E) BP Brploratlon(Alaska) Image Project Well History File Cover Page XHVZE This page identifies those items that were not scanned during the initial production scanning phase. They are available in the original file, may be scanned during a special rescan activity or are viewable by direct inspection of the file. j ,D, - 13 I Well History File Identifier Organizing (done) ❑ Two-sided ❑ Rescan Needed RESCAN: OVERSIZED: NOTES: Col Items: ❑ Maps: rayscale Items: ogs: ❑ Poor Quality Originals: ❑ Other: ❑ Other: BY: MS Date: / `v ! /s/ ye Project Proofing BY: :Maria) Date: I A/0 / /s/ MP • Scanning Preparation 3 x 30 = (0 + / = TOTAL PAGESqi 1 / (Count does not include cover sheet) fBY: Maria Date: /� 9. 14')I Production Scanning Stage 1 Page Count from Scanned File: (Count does include cov eet) q Page Count Matches Number in Scanning Preparation: V' YES NO � BY: AD Date: ,-///O /� /s/1/14/3 Stage 1 If NO in stage 1, page(s) discrepancies___ were found: YES NO BY: Maria Date: /s/ Stage 2 Additional Well Reports: YES NO TOTAL PAGES: Digital version appended by: Meredith Michal Date: /s/ Final Page Count: Stage 1 + Stage 2: TOTAL PAGES: Scanning is complete at this point unless rescanning is required. ReScanned BY: Maria Date: /s/ Comments about this file: Quality Checked 7/8/2014 Well History File Cover Page_20140708.doc o I 4 1 I E a E a U pl w E >. E _>. o w_ co CV Z '7 I J + C7 > E (7 > E N w N ' N O) O) .> y `v�y7 >. y m wl JI co U N N >_ ',, c I C C .y CC L .y CC L 9 N w Z I ac O LL N III p a)tY O 12 N O T. ° ao d pl T ami a'i m C7 �— �w �w �O g Z 2 I Z Z o m + o m + E_1 E�� Eu- EU NI a w? (D 73' o o p o o c� �_ �_ Ca N J J N Q (nU c m o aai a) oC o d m 16 W =I it it it,w U 0 .0 d� a.- a 0 a.- ° - 0 'n E p N m a)N a)N O JI pp o J O O E0 E .N a) O 7 a7 a) O j c co,- cnM_ cow cna N O co o� o� aJ g� ft aJ g� co (13 z; o mZ o c II E o� o a g'•E m m E m CO C7 ON 00 00 p i`-° Ww y a Z N a_cc 2= aW a uF .0 m .0m gip= cv I Q m -I o F- °'r m o co E ,__ m °' cWi) E 2 2ww ow ow o�mi EWE J to0 U 0 0 0 m E p m p m m a p m p m m w N 0 N Nc. a)n'o d�I= Q -.- 12 E 21- 20 2W F-o d m �w �U d w — W.- W.- W N N W N m a) E 0^ o U C 'O IM_ _M _M co_ co_ _M co_ co co co co co_ _M li Y > 0 O O O O O O O O O O O 0 W m N N N N N N N N N N N N N V'(O CO (O c0 c0 (� CD CO M M (\ O O N m 1i m co co co co CD co co ‘- Ce a X I c c c c c c c c W w I a) a) a) a) a) a) a) a) X UoV 0_ 03 lo O O O O o o Zo , al p p 0 OO OO coO coO coO hao co coO H coa+ N IO O _ N,MO MO coO coO OOO MNOO co a) II .- .- 0 co a, ' CV CV CV N CL M CO ZI C O OCO O CV O O M M co h. N. r- r � O O ,_ .- O O O O G z � N co 0 0 o co co co co ON a Cl)c O E a O U E I m J n wz° Q N 00 J co I 11 N U pO JO UU UHZ N 2 U W Q > N U C)(0 1:13 O_ /U J c N N O N O W a) CC CO I M ° 1 iW Q a o 1 W Qa) C a ZI I / Ex 0 Z IS Uo, p E J Z 0 m m m m m > as m m m m a) am' CC CC CC CC ce cC m is m m m n !I c E c c m m a) m m m 0 0 0 0 0 ) (c co o c o ZIP 2 E E E E E E E E E E E :° :° w° - :° E a) a) a) rn ) 1 Cl)a) Z a) C0 0 0 0 0 Cco c co co co 7 ° 0 0 0 0 c ° Z o " m` Q J a) I0 N N N O O O U) V ''I Q i .) ch 'E 'o O N r N- N- N- n co co co O O a) t) .� E M M N. h f- n ao CO ao CO CO N z 0 o W co Z IN N N N N N N N N CV N N H H O 0 Q o € - El o7 2 c °)'vi a a a 0 Z Lu O U U 0 U U U U 0 Q J rn:° o ' p o p ° ° ° p pp Cr m .Io ° o o o d1 r4 HJ0 F 3J G W J J W J J W W W W W W / / i1 / 1 i / i 1 c 1 N I I w w w 01 4 _1 _ JI JLI 1 J1 Z Z z Ir N Z �I �1 Z Z Z r } >" N U Z Z UI UI UI H ci, in o = LILI wI 0 0 0 a �p ak Q Q > > > W C 1 C I 21 HI HI HI li 1' y o a LZ N N N N N L o — oN oN oN N oN 0 a Q j HI— H0 F-0 H0 92 d a 0 00 O O O 0 0 0 � • Q 6 N I c6 N I 6 N I 6 N I m 6 N I ED 1 14. U ci co m ui Et) a)cn ai co ai cn Z LLct E ILEt U- Etrn LLcc rn wix0 c a a Q 0 1 v_ I U 10 0 lo 910- m Z z Y m o0 rn o0Q o02 20= 002 ' E > > c J �_ _�nI= y ni= ^1�1 y r-0 y^1�1 E -.a.,CO m O Ce Q C WNm WNCD WNJ WNJ WN-I � O N N ` Q w 0 O M co f�) co co O.r .D a H 0 o 0 0 0 0 E co E p' 0 WO N N N N N m 7 Q O O O O O u) Z IX 0 c0 (O (O CO c0 m a it E V1 W W 9 O1 V1 N J d m (7) O. d N> E J E Z m m O •U .O-. (n Q .:§ Q' O 0 01 `41 y O. C !CL� 0 U c U U G O .� W 0 =' E O a V U Z ~ W >- >- J c Q on N o to 1 ~ N 0. O � N p Z N m O c CO 11 >- N aC N E li CO o o H E O i' m U (1) ,I C = m (I) U G) C ? 0 O c O ; ICC cc C — f6 a To N C U Q '\ Q O aU t 0 \� as O 0 E 0 0 2 a 1 1 m .,Z ., co co co co co �\ h. 3 10 0 00 0 a n cfl To To m To To p Z o I D 2) .2' .2' .� to >- >- >- Q 0 Q Q Q C V.� o Q o CO CO W CO N W C 0. y in Tr in g Tr r N N N N CO N N V 0 N H H H H H �. o c N ) , m E Z ai Qo O co d z Q o C c U 0 U U 0 o 2 d .0 .� m 1 m iU n 7 0 II E ! E y 0 I 0 0 0 0 0 j m Z o 2 cu o o a w w w w w 3 0 a 0 1t 0 O Zt2-'3 RECEIVED DEC 202013 raw" AOGCC BAKEHUGHES 2-31.32 www.bakerhughes.com PRINT DISTRIBUTION LIST DATA LOGGED ‘,2.30/2o13 M K BENDER COMPANY BP EXPLORATION(ALASKA), INC COUNTY NORTH SLOPE BOROUGH WELL NAME 18-27EPB1 STATE ALASKA HELD PRUDHOE BAY UNIT UA I L 12/18/2013 THIS DISTRIBUTION LIST AUTHORIZED BY: Alfredo Martinez SO#4991608 CopiesLog Log Data CD Client/ Partners Copies Data CD Client/ Partners Company BP EXPLORATION(ALASKA), INC Company Person PETROTECHNICAL DATA CENTER Person 3 1 Address LR2-1 Address 900 E BENSON BLVD ANCHORAGE,AK 99508 Company EXXON MOBIL ALASKA 'Company 1 1 Person Lynda Myascell/Leonardo Elias Person Address 3700 Centerpoint Dr. Address Suite 600 ANCHORAGE,AK 99503 Company STATE OF ALASKA-AOGCC Company 1 1 Person CHRISTINE MAHNKEN Person Address 333 W.7TH AVE. Address SUITE 100 ANCHORAGE,AK 99501 Company DNR-DIVISION OF OIL&GAS Company Person CORAZON MANAOIS Person 1 Address 550 WEST 7TH AVE. Address SUITE 800 ANCHORAGE,AK 99501 Company ConocoPhillips Alaska Inc. Company Person Ricky Elganicio Person 1 Address PO Box 10036 Address Anchorage,AK 99510 Company Company Person Person Address Address Page 1 of 1 2-�2.-l3t 2-313y RECEIVED DEC 19 2013 BAKER 11QG CC HUGHES wirw.bakerhughes.com PRINT DISTRIBUTION LIST DATA LOGGED 12,/30/2013 .M K BENDER COMPANY BP EXPLORATION(ALASKA),INC COUNTY NORTH SLOPE BOROUGH WELL NAME 18-27E STATE ALASKA FIELD PRUDHOE BAY UNIT DAIL 12/17/2013 THIS DISTRIBUTION LIST AUTHORIZED BY: Alfredo Martinez SO#4991608 CopiesL og g Data CD Client Partners Coo es Data CD ClientPartners � P� / Company BP EXPLORATION(ALASKA), INC Company Person PETROTECHNICAL DATA CENTER Person 3 1 Address LR2-1 Address 900 E BENSON BLVD ANCHORAGE,AK 99508 Company EXXON MOBIL ALASKA Company 1 1 Person Lynda Myascell/Leonardo Elias Person Address 3700 Centerpoint Dr. Address Suite 600 ANCHORAGE,AK 99503 Company STATE OF ALASKA-AOGCC Company 1 1 Person CHRISTINE MAHNKEN Person Address 333 W.7TH AVE. Address SUITE 100 ANCHORAGE,AK 99501 Company DNR-DIVISION OF OIL&GAS Company Person CORAZON MANAOIS Person 1 Address 550 WEST 7TH AVE. Address SUITE 800 ANCHORAGE,AK 99501 Company ConocoPhillips Alaska Inc. Company Person Ricky Elganicio Person 1 Address PO Box 10036 Address Anchorage,AK 99510 Company Company Person Person Address Address Page 1 of I g a rim It BAKER PRINT DISTRIBUTION LISTN 10 ZU.i3 HUGHES AOC COMPANY BP Exploration(Alaska)Inc. INTERMEDIATE FINAL Yes (mandatory) WELL NAME 1'- ZT RUN NUMBER Z\ Z \--S \ (mandatory) LC— CO FIELD Prudhoe Bay BH SALESMAN Okechukwu(Okey)Anyanwu (mandatory) (mandatory) COUNTY North Slope Borough BH DISTRICT Alaska (mandatory) (mandatory) STATE Alaska PAGE OF (mandatory) LOG DATE: TODAYS DATE: 6/5/2013 (mandatory) DISTRIBUTION LIST AUTHORIZED BY: BP Exploration(Alaska)Inc. (mandatory) HAS CLIENT BEEN INVOICED FOR ADDITIONAL PRINTS? COMPANY FIELD FINAL (dig CiDl/ ADDRESS(FEDEX WILL NOT DELIVER TO P.O.BOX) LOGS LOGS image) FILM PERSON ATTENTION #OF PRINTS #01-THIN 15 #OF COPIES #OF COPIES 1 BP Exploration(Alaska)Inc. I I 3 1 I I Petrotechnical Data Center ll LR2-1 900 E.Benson Blvd. Anchorage,Alaska 99508 2 ConocoPhillips Alaska Inc. I 1 1 I I Attn Ricky Elgarico PO Box 100360 Anchorage,Alaska 99510 3 ExxonMobil,Alaska I 1 I 1 1 I Attn Lynda M.Yaskell and/or Leonardo Elias 3700 Centerpointe Dr. Suite 600 Anchorage,Alaska 99503 4 State of Alaska-AOGCC I 1 I 1 I I I Christine Shartzer 333 West 7th Ave,Suite 100 Anchorage,Alaska 99501 5 DNR-Division of Oil&Gas I I 1 I I I Attn:Sean Clifton 550 W.7th Ave,Suite 800 Anchorage,Alaska 99501 TOTALS FOR THIS PAGE: 0 5 5 0 0 0 TOTALS FOR ALL PAGES: 0 5 5 0 0 0 '>e lWI f it 1`.1r,'µ,-1 -_a9 4:y e.— BAKER. PRINT DISTRIBUTION LISiT 0 6 2013 HUGHES AOGCC COMPANY BP Exploration(Alaska)Inc. INTERMEDIATE FINAL Yes (mandatory) -2—k'-2--` t WELL NAME \%-Z1VbA 2 RUN NUMBER (mandatory) 22--^-7 I FIELD Prudhoe Bay BH SALESMAN Okechukwu(Okey)Anyanwu 666 (mandatory) (mandatory) COUNTY North Slope Borough BH DISTRICT Alaska (mandatory) (mandatory) STATE Alaska PAGE OF (mandatory) LOG DATE: TODAYS DATE: 5/31/2013 (mandatory) 1 DISTRIBUTION LIST AUTHORIZED BY: BP Exploration(Alaska)Inc. (mandatory) HAS CLIENT BEEN INVOICED FOR ADDITIONAL PRINTS? ,oma CD COMPANY FIELD FINAL (digital/ ADDRESS(FEDEX WILL NOT DELIVER TO P.O.BOX) LOGS LOGS image) FILM PERSON ATTENTION #OF PRINTS #Or NHIN I S #OF COPIES #OF COPIES g 4 4 11 4 1 BP Exploration(Alaska)Inc. I 3 I 1 I 1Petroterhnical Data Center LR2-1 900 E.Benson Blvd. 1 Anchorage,Alaska 99508 1 1 2 1ConocePhillips Alaska Inc. [ I I 1 I I IAttn Ricky Elgarico IPO Box 100360 Anchorage,Alaska 99510 1 3 ExxonMobil,Alaska 1 1 I I Attn Lynda M.Yaskell and/or Leonardo Elias 3700 Centerpointe Dr. 1 Suite 600 Anchorage,Alaska 99503 1 4 State of Alaska-AOGCC 1 I 1 I 1 I I Christine Shartzer 333 West 7th Ave,Suite 100 Anchorage,Alaska 99501 51DNR-Division of Oil&Gas I I I 1 I I I Attn:Sean Clifton 1550 W.7th Ave,Suite 800 Anchorage,Alaska 99501 TOTALS FOR THIS PAGE: 0 5 5 0 0 0 TOTALS FOR ALL PAGES: 0 5 5 0 0 0 • • Letter of Transmittal FARM BAKERDate: December 20, 2012 HUGHES To: From: State of Alaska AOGCC Baker Hughes INTEQ 333 W. 7th Ave., Suite 100 795 East 94th Avenue Anchorage, Alaska 99501 Anchorage, Alaska 99515 Bill Michaelson Please find enclosed the directional survey data for the following well(s): \ll t X29 9$61-21j -- 18-27EPB 1, 18-27EPB2, 18-27E 06-16A D-29A E-20B D-19C P-19L1PB1, P-19L1 swop APR 2 12011 P-12BL1 W-02B Z-07B Enclosed for each well(s): 2 hardcopy prints of directional survey reports 1 compact disk containing electronic survey files Please sign and return one copy of this transmittal form to: BP Exploration (Alaska) Inc. Petrotechnical Data Center, LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99508 to acknowledge receipt of this data. RECEIVED BY: VI) tate of Alaska AOGCC DATE: 42S-1 -1)7424144-. `3 2v2-k 31 2-1rt 2`7 rj�� BAKER KER �, HUGHES INTEQ1:::-';;;;;;Iiiti; =a „n North America - ALASKA - BP Prudhoe Bay PB DS 18 18-27 18-27E .' Survey: MWD fi fig; y. Survey Report - Geographic i 26 October, 2012 0� f 4 ::',€::4';.:::- T k,,,,,;:::::',-,',''', 1::: .,4,1:07::4.,',14::1;,,..:4,11'.,(14;171: 0 1"" 1 V 0 ;. HUGHES Survey Report- Geographic INTEQ Company: North America-ALASKA-BP Local Co-ordinate Reference: Well 18-27 Project: Prudhoe Bay TVD Reference: 18-27C @ 53.35ft(Nordic 1) Site: PB DS 18 MD Reference: 18-27C @ 53.35ft(Nordic 1) Well: 18-27 North Reference: True Wellbore: 18-27E Survey Calculation Method: Minimum Curvature Design: 18-27E Database: EDM .16-ANC Prod-WH24P Project Prudhoe Bay,GPB,PRUDHOE BAY Map System: US State Plane 1927(Exact solution) System Datum: Mean Sea Level n Well Reference Point Geo Datum: NAD 1927(NADCON CONUS) Map Zone: Alaska Zone 04 Using geodetic scale factor Site PB DS 18,TR-11-14 Site Position: Northing: 5,959,213.15ft Latitude: 70° 17'35.252 N From: Map Easting: 691,583.44ft Longitude: 148°26'55.55 W'. Position Uncertainty: 0.00 ft Slot Radius: 0.000 in Grid Convergence: 1.46 ° Well 18-27 API No 500292232100 Well Position +N/-S 0.00 ft Northing: 5,960,969.34 ft Latitude: 70° 17'52.535 N +EI-W 0.00 ft Easting: 691,522.34 ft Longitude: 148°26'56.03 W Position Uncertainty 0.00 ft Wellhead Elevation: ft Ground Level: 15.40ft 1 Wellbore 18-27E API No 500292232105 Magnetics Model Name Sample Date Declination Dip Angle Field Strength (0) (°) BGGM2012 9/15/2012 20.91 81.04 57,640 Design 18-27E Audit Notes: Version: 1.0 Phase: ACTUAL Tie On Depth: 10,490.32 Vertical Section: Depth From(TVD) +N/-S +El-W Direction ' : w` (ft) (ft) (ft) (0) 37.65 0.00 0.00 310.59 Survey Program Date: 10/22/2012 From To (ft) (ft) Survey(Wellbore) Tool Name Description 951.56 9,733.51 18-27 Srvy MWD(18-27) MWD MWD-Standard 9,830.00 10,294.09 18-27A Srvy MWD(18-27A) MWD MWD-Standard 10,300.50 10,490.32 MWD(18-27EPB1) MWD MWD-Standard 10,501.00 13,187.00 MWD(18-27E) MWD MWD-Standard 10/26/2012 2:53:51 PM Page 2 COMPASS 2003.16 Build 73 Mid I ,. BAKER • II HUGHES Survey Report- Geographic 0 by INTEQ Company: North America-ALASKA-BP Local Co-ordinate Reference: Well 18-27 Project: Prudhoe Bay TVD Reference: 18-27C @ 53.35ft(Nordic 1) Site: PB DS 18 MD Reference: 18-27C @ 53.35ft(Nordic 1) Well: 18-27 North Reference: True Wellbore: 18-27E Survey Calculation Method: Minimum Curvature Design: 18-27E Database: EDM.16-ANC Prod-WH24P Survey f� Measured Vertical Map Map Depth Inclination Azimuth Depth +N/-S +E/_W Northing Easting (ft) (') (°) (ft) (ft) (ft) (ft) (ft) Latitude Longitude 10,490.32 86.35 321.91 8,673.89 1,478.99 -3,659.31 5,962,354.51 687,826.74 70° 18'7.072 N 148°28'42.72 W TIP 10,501.00 86.40 323.33 8,674.57 1,487.46 -3,665.78 5,962,362.81 687,820.06 70°18'7.155 N 148°28'42.91 W KOP 10,530.26 89.39 318.82 8,675.64 1,510.20 -3,684.15 5,962,385.07 687,801.12 70° 18'7.379 N 148°28'43.45 W 10,560.45 91.26 316.44 8,675.47 1,532.50 -3,704.49 5,962,406.85 687,780.21 70° 18'7.598 N 148°28'44.04 W 10,590.52 88.41 312.69 8,675.56 1,553.59 -3,725.91 5,962,427.39 687,758.27 70°18'7.806 N 148°28'44.66 W 10,620.57 86.13 314.66 8,676.99 1,574.32 -3,747.62 5,962,447.55 687,736.04 70° 18'8.009 N 148°28'45.30 W 10,650.63 86.07 320.16 8,679.04 1,596.39 -3,767.90 5,962,469.10 687,715.20 70° 18'8.226 N 148°28'45.89 W 10,680.46 83.70 325.47 8,681.70 1,620.05 -3,785.86 5,962,492.29 687,696.65 70° 18'8.459 N 148°28'46.41 W 10,710.33 84.16 330.43 8,684.86 1,645.21 -3,801.61 5,962,517.04 687,680.26 70°18'8.706 N 148°28'46.87 W'''' 10,740.41 85.18 334.69 8,687.65 1,671.79 -3,815.41 5,962,543.26 687,665.79 70° 18'8.968 N 148°28'47.27 W 10,770.66 88.31 338.78 8,689.37 1,699.53 -3,827.33 5,962,570.68 687,653.16 70° 18'9.240 N 148°28'47.62 W, 10,800.65 90.37 339.07 8,689.72 1,727.51 -3,838.12 5,962,598.37 687,641.67 70°18'9.515 N 148°28'47.94 W C 10,830.59 91.60 334.67 8,689.20 1,755.03 -3,849.87 5,962,625.59 687,629.22 70° 18'9.786 N 148°28'48.28 W 10,860.53 92.00 330.60 8,688.26 1,781.60 -3,863.62 5,962,651.80 687,614.79 70°18'10.047 N 148°28'48.68 W 10,890.47 89.36 330.21 8,687.91 1,807.63 -3,878.41 5,962,677.44 687,599.35 70° 18'10.303 N 148°28'49.11 W 10,920.51 86.81 335.37 8,688.91 1,834.32 -3,892.13 5,962,703.77 687,584.95 70° 18'10.566 N 148°28'49.51 W 10,950.48 85.52 341.10 8,690.92 1,862.08 -3,903.22 5,962,731.23 687,573.17 70° 18'10.839 N 148°28'49.84 W 10,980.71 86.50 345.87 8,693.02 1,890.98 -3,911.79 5,962,759.91 687,563.86 70°18'11.123 N 148°28'50.09 W 11,010.33 84.78 349.98 8,695.27 1,919.85 -3,917.96 5,962,788.61 687,556.95 70° 18'11.407 N 148°28'50.27 W 11,040.47 88.86 354.90 8,696.95 1,949.67 -3,921.92 5,962,818.32 687,552.24 70° 18'11.700 N 148°28'50.38 W I 11,070.25 91.69 359.65 8,696.80 1,979.41 -3,923.33 5,962,848.00 687,550.07 70°18'11.992 N 148°28'50.43 W 11,100.35 93.72 5.17 8,695.38 2,009.43 -3,922.07 5,962,878.05 687,550.56 70° 18'12.288 N 148°28'50.39 W 11,130.38 90.34 8.74 8,694.32 2,039.21 -3,918.44 5,962,907.91 687,553.44 70° 18'12.581 N 148°28'50.28 W l 11,160.30 91.41 12.72 8,693.86 2,068.60 -3,912.87 5,962,937.43 687,558.25 70° 18'12.870 N 148°28'50.12 W i 11,190.30 93.10 8.60 8,692.68 2,098.05 -3,907.32 5,962,967.01 687,563.05 70° 18'13.159 N 148°28'49.96 W 11,220.41 94.05 4.45 8,690.80 2,127.90 -3,903.91 5,962,996.94 687,565.70 70° 18'13.453 N 148°28'49.86 W 11,250.39 96.75 0.65 8,687.98 2,157.71 -3,902.58 5,963,026.77 687,566.27 70° 18'13.746 N 148°28'49.82 W f 11,280.33 96.37 354.74 8,684.56 2,187.42 -3,903.78 5,963,056.44 687,564.32 70°18'14.038 N 148°28'49.86 W 11,310.36 96.79 351.22 8,681.11 2,217.02 -3,907.42 5,963,085.93 687,559.92 70° 18'14.329 N 148°28'49.97 W 11,341.44 94.70 351.41 8,678.00 2,247.59 -3,912.09 5,963,116.37 687,554.47 70° 18'14.630 N 148°28'50.10 W I 11,372.45 92.21 356.34 8,676.13 2,278.35 -3,915.39 5,963,147.04 687,550.39 70° 18'14.933 N 148°28'50.20 W I 11,401.95 91.56 0.47 8,675.16 2,307.82 -3,916.21 5,963,176.47 687,548.82 70°18'15.222 N 148°28'50.22 W 11,430.37 90.86 4.38 8,674.56 2,336.20 -3,915.01 5,963,204.88 687,549.30 70° 18'15.502 N 148°28'50.19 W 11,460.38 90.12 9.04 8,674.30 2,366.00 -3,911.50 5,963,234.75 687,552.04 70°18'15.795 N 148°28'50.09 W 11,500.44 91.78 4.96 8,673.64 2,405.74 -3,906.62 5,963,274.61 687,555.91 70° 18'16.186 N 148°28'49.95 W 11,530.63 91.26 0.56 8,672.84 2,435.88 -3,905.17 5,963,304.77 687,556.59 70° 18'16.482 N 148°28'49.90 W 11,560.19 90.92 356.07 8,672.28 2,465.41 -3,906.04 5,963,334.27 687,554.97 70°18'16.772 N 148°28'49.93 W I 11,590.19 91.44 352.62 8,671.66 2,495.26 -3,908.99 5,963,364.02 687,551.26 70° 18'17.066 N 148°28'50.02 W 11,620.57 90.52 349.64 8,671.14 2,525.27 -3,913.68 5,963,393.90 687,545.81 70° 18'17.361 N 148°28'50.15 W 11,650.67 90.86 344.83 8,670.78 2,554.61 -3,920.32 5,963,423.07 687,538.42 70° 18'17.650 N 148°28'50.35 W I 11,680.79 89.42 340.94 8,670.70 2,583.39 -3,929.19 5,963,451.61 687,528.82 70° 18'17.933 N 148°28'50.61 W 11,710.11 88.37 336.82 8,671.27 2,610.73 -3,939.75 5,963,478.67 687,517.57 70°18'18.201 N 148°28'50.91 W 11,740.53 88.28 332.25 8,672.16 2,638.18 -3,952.82 5,963,505.77 687,503.81 70°18'18.471 N 148°28'51.30 W I 11,770.60 87.91 326.70 8,673.16 2,664.05 -3,968.08 5,963,531.25 687,487.89 70° 18'18.726 N 148°28'51.74 W 11,800.75 88.37 322.17 8,674.14 2,688.56 -3,985.60 5,963,555.30 687,469.75 70°18'18.967 N 148°28'52.25 W 11,830.55 87.21 317.71 8,675.29 2,711.35 -4,004.76 5,963,577.59 687,450.02 70° 18'19.191 N 148°28'52.81 W 11,860.40 88.23 317.98 8,676.47 2,733.46 -4,024.77 5,963,599.18 687,429.45 70° 18'19.408 N 148°28'53.40 W 11,890.63 91.35 325.60 8,676.59 2,757.19 -4,043.46 5,963,622.43 687,410.17 70° 18'19.641 N 148°28'53.94 W 11,922.15 89.14 331.34 8,676.45 2,784.04 -4,059.93 5,963,648.85 687,393.02 70°18'19.905 N 148°28'54.42 W 11,949.85 88.07 334.07 8,677.13 2,808.65 -4,072.63 5,963,673.13 687,379.70 70° 18'20.147 N 148°28'54.79 W 11,979.81 89.66 340.12 8,677.72 2,836.23 -4,084.28 5,963,700.40 687,367.35 70° 18'20.418 N 148°28'55.13 W 12,010.53 89.85 344.75 8,677.85 2,865.51 -4,093.55 5,963,729.43 687,357.33 70°18'20.706 N 148°28'55.40 W 12,040.58 92.02 351.40 8,677.36 2,894.89 -4,099.75 5,963,758.64 687,350.38 70° 18'20.995 N 148°28'55.58 W j 10/26/2012 2:53:51PM Page 3 COMPASS 2003.16 Build 73 NMI • • HUGHES Survey Report- Geographic 0 by ., IQ CompaNTEny: North America-ALASKA-BP Local Co-ordinate Reference: Well 18-27 Project: Prudhoe Bay TVD Reference: 18-27C @ 53.35ft(Nordic 1) Site: PB DS 18 MD Reference: 18-27C @ 53.35ft(Nordic 1) Well: 18-27 North Reference: True Wellbore: 18-27E Survey Calculation Method: Minimum Curvature Design: 18-27E Database: EDM .16-ANC Prod-WH24P Survey .. y,y . . .- "w � _< Measured Vertical Map Map Depth Inclination Azimuth Depth +N/-S +E/-W Northing Easting (ft) (1 (0) (ft) (ft) (ft) (ft) (ft) Latitude Longitude 12,070.50 90.31 355.64 8,676.75 2,924.60 -4,103.13 5,963,788.26 687,346.25 70°18'21.287 N 148°28'55.68 W 12,100.55 89.39 0.97 8,676.83 2,954.63 -4,104.02 5,963,818.25 687,344.60 70° 18'21.583 N 148°28'55.71 W 12,130.98 89.75 5.34 8,677.06 2,985.00 -4,102.34 5,963,848.65 687,345.50 70°18'21.881 N 148°28'55.66 W' 12,161.83 91.17 2.29 8,676.81 3,015.78 -4,100.29 5,963,879.47 687,346.77 70° 18'22.184 N 148°28'55.60 W 12,190.70 91.81 359.40 8,676.06 3,044.63 -4,099.87 5,963,908.32 687,346.46 70°18'22.468 N 148°28'55.59 W 12,220.59 91.50 355.59 8,675.20 3,074.48 -4,101.17 5,963,938.12 687,344.39 70° 18'22.761 N 148°28'55.63 W 12,250.72 89.45 351.05 8,674.95 3,104.39 -4,104.67 5,963,967.94 687,340.13 70°18'23.056 N 148°28'55.73 W 12,282.37 89.85 347.35 8,675.14 3,135.47 -4,110.60 5,963,998.86 687,333.41 70° 18'23.361 N 148°28'55.90 W 12,310.53 88.56 343.77 8,675.53 3,162.74 -4,117.62 5,964,025.93 687,325.69 70° 18'23.629 N 148°28'56.11 W i 12,340.59 90.09 340.11 8,675.88 3,191.31 -4,126.94 5,964,054.25 687,315.65 70° 18'23.910 N 148°28'56.38 W 12,370.77 90.18 336.72 8,675.81 3,219.37 -4,138.04 5,964,082.02 687,303.84 70° 18'24.186 N 148°28'56.71 W,I 12,400.61 90.31 332.95 8,675.69 3,246.37 -4,150.73 5,964,108.69 687,290.47 70°18'24.452 N 148°28'57.08 W 12,432.41 89.88 329.41 8,675.63 3,274.23 -4,166.06 5,964,136.14 687,274.44 70° 18'24.726 N 148°28'57.52 W, 12,460.85 90.28 326.31 8,675.59 3,298.30 -4,181.18 5,964,159.83 687,258.71 70°18'24.962 N 148°28'57.97 W 12,492.55 90.80 322.95 8,675.29 3,324.15 -4,199.53 5,964,185.20 687,239.71 70° 18'25.216 N 148°28'58.50 W 12,520.59 90.25 319.46 8,675.04 3,346.00 -4,217.09 5,964,206.59 687,221.59 70°18'25.431 N 148°28'59.01 W 12,550.29 90.55 315.37 8,674.83 3,367.86 -4,237.19 5,964,227.93 687,200.95 70° 18'25.646 N 148°28'59.60 W 12,582.67 89.05 310.49 8,674.94 3,389.91 -4,260.89 5,964,249.36 687,176.70 70°18'25.863 N 148°29'0.29 W 12,610.83 89.26 313.40 8,675.36 3,408.73 -4,281.83 5,964,267.64 687,155.29 70° 18'26.048 N 148°29'0.90 W I1 12,640.77 89.17 319.35 8,675.77 3,430.39 -4,302.47 5,964,288.77 687,134.10 70° 18'26.261 N 148°29'1.50 W 12,670.57 90.12 324.61 8,675.95 3,453.85 -4,320.82 5,964,311.76 687,115.16 70° 18'26.491 N 148°29'2.04 W 1 12,700.46 90.28 320.75 8,675.85 3,477.62 -4,338.94 5,964,335.05 687,096.44 70° 18'26.725 N 148°29'2.57 W 12,731.25 90.92 317.51 8,675.53 3,500.90 -4,359.08 5,964,357.81 687,075.71 70°18'26.954 N 148°29'3.16 W 12,760.77 90.12 316.53 8,675.26 3,522.49 -4,379.21 5,964,378.89 687,055.05 70° 18'27.166 N 148°29'3.74 W 12,790.67 89.42 322.45 8,675.38 3,545.22 -4,398.62 5,964,401.10 687,035.06 70°18'27.390 N 148°29'4.31 W 12,820.71 89.33 326.91 8,675.71 3,569.72 -4,415.98 5,964,425.16 687,017.08 70° 18'27.630 N 148°29'4.82 W j 12,850.35 89.60 331.18 8,675.98 3,595.13 -4,431.22 5,964,450.17 687,001.20 70°18'27.880 N 148°29'5.26 W 12,880.95 89.02 335.84 8,676.35 3,622.51 -4,444.87 5,964,477.19 686,986.86 70° 18'28.149 N 148°29'5.66 W 12,910.66 88.80 339.88 8,676.92 3,650.02 -4,456.06 5,964,504.40 686,974.97 70°18'28.420 N 148°29'5.99 W 12,940.77 90.00 344.30 8,677.23 3,678.66 -4,465.32 5,964,532.80 686,964.99 70° 18'28.702 N 148°29'6.26 W 12,971.85 91.87 347.83 8,676.73 3,708.81 -4,472.80 5,964,562.75 686,956.74 70° 18'28.998 N 148°29'6.48 WI 13,002.46 94.64 345.07 8,674.99 3,738.52 -4,479.96 5,964,592.26 686,948.83 70° 18'29.290 N 148°29'6.69 W I 13,031.08 91.96 342.15 8,673.34 3,765.92 -4,488.02 5,964,619.45 686,940.07 70°18'29.560 N148°29'6.92 W 13,060.67 90.86 338.33 8,672.61 3,793.76 -4,498.02 5,964,647.02 686,929.37 70° 18'29.833 N 148°29'7.21 W 13,090.91 89.48 333.11 8,672.52 3,821.31 -4,510.45 5,964,674.25 686,916.24 70° 18'30.104 N 148°29'7.58 W 13,116.82 91.23 331.13 8,672.36 3,844.21 -4,522.56 5,964,696.83 686,903.55 70°18'30.329 N 148°29'7.93 W 13,142.57 90.83 329.60 8,671.90 3,866.59 -4,535.29 5,964,718.87 686,890.25 70° 18'30.549 N 148°29'8.30 W 13,187.00 90.83 329.60 8,671.26 3,904.91 -4,557.77 5,964,756.60 686,866.80 70° 18'30.926 N 148°29'8.96 W TD-2718" 10/26/2012 2:53:51PM Page 4 COMPASS 2003.16 Build 73 • 2�2-`31 • 2$l2� BAKER HUGHES INTEQ North America - ALASKA - BP Prudhoe Bay PB DS 18 18-27 18-27EPB1 Survey: MWD Survey Report - Geographic 26 October, 2012 0 by • 0 HUGHES II) Survey Report- Geographic bp INTEQ Company: North America-ALASKA-BP Local Co-ordinate Reference: Well 18-27 Project: Prudhoe Bay TVD Reference: 18-27C @ 53.35ft(Nordic 1) Site: PB DS 18 MD Reference: 18-27C @ 53.35ft(Nordic 1) Well: 18-27 North Reference: True Wellbore: 18-27EPB1 Survey Calculation Method: Minimum Curvature Design: 18-27EPB1 Database: EDM .16-ANC Prod-WH24P Project Prudhoe Bay,GPB,PRUDHOE BAY Map System: US State Plane 1927(Exact solution) System Datum: Mean Sea Level Geo Datum: NAD 1927(NADCON CONUS) Using Well Reference Point Map Zone: Alaska Zone 04 Using geodetic scale factor Site PB DS 18,TR-11-14 j Site Position: Northing: 5,959,213.15ft Latitude: 70° 17'35.252 N From: Map Easting: 691,583.44ft Longitude: 148°26'55.55 W Position Uncertainty: 0.00 ft Slot Radius: 0.000in Grid Convergence: 1.46 ° ..-----.-. I Well 18-27 API No 500292232100 Well Position +NI-S 0.00 ft Northing: 5,960,969.34 ft Latitude: 70° 17'52.535 N i +EI-W 0.00 ft Easting: 691,522.34 ft Longitude: 148°26'56.03 W I Position Uncertainty 0.00 ft Wellhead Elevation: ft Ground Level: 15.40ft i Wellbore 18-27EPB1 API No 500292232171 Magnetics Model Name Sample Date Declination Dip Angle gField Strength 1 BGGM2012 9/15/2012 20.91 81.04 57,640 Design 18-27EPB1 Audit Notes: Version: Phase: ACTUAL Tie On Depth: 10,294.09 Vertical Section: Depth From(ND) +NI-S +E/-W Direction (ft) (ft) (ft) (°) 37.65 0.00 0.00 292.76 .._--.- ....--.-. Survey Program Date: 10/15/2012 From To (ft) (ft) Survey(Wellbore) Tool Name Description 951.56 9,733.51 18-27 Srvy MWD(18-27) MWD MWD-Standard 9,830.00 10,294.09 18-27A Srvy MWD(18-27A) MWD MWD-Standard 10,300.50 11,025.00 MWD(18-27EPB1) MWD MWD-Standard 10/26/2012 2:44:39PM Page 2 COMPASS 2003.16 Build 73 • Will BAKER HUGHES Survey Report- Geographic 0 by INTEQ Company: North America-ALASKA-BP Local Co-ordinate Reference: Well 18-27 Project: Prudhoe Bay TVD Reference: 18-27C @ 53.35ft(Nordic 1) Site: PB DS 18 MD Reference: 18-27C @ 53.35ft(Nordic 1) Well: 18-27 North Reference: True Wellbore: 18-27EPB1 Survey Calculation Method: Minimum Curvature Design: 18-27EPB1 Database: EDM .16-ANC Prod-WH24P Survey Measured Vertical Map Map Depth Inclination Azimuth Depth +N/-S +E/-W Northing Easting (ft) (°) (°) (ft) (ft) (ft) (ft) (ft) Latitude Longitude 10,294.09 86.67 296.13 8,659.36 1,356.96 -3,508.45 5,962,236.37 687,980.65 70° 18'5.873 N 148°28'38.32 W TIP 10,300.50 86.67 295.83 8,659.73 1,359.76 -3,514.20 5,962,239.03 687,974.83 70° 18'5.900 N 148°28'38.49 W KOP 10,330.24 84.61 300.88 8,662.00 1,373.84 -3,540.29 5,962,252.43 687,948.40 70°18'6.039 N 148°28'39.25 W 10,360.71 84.21 306.08 8,664.97 1,390.56 -3,565.58 5,962,268.50 687,922.69 70° 18'6.203 N 148°28'39.99 W 10,390.28 86.83 308.41 8,667.28 1,408.40 -3,589.04 5,962,285.74 687,898.79 70° 18'6.378 N 148°28'40.67 W 10,428.40 85.61 313.83 8,669.79 1,433.41 -3,617.68 5,962,310.00 687,869.51 70°18'6.624 N 148°28'41.51 W 10,457.14 86.40 317.03 8,671.79 1,453.83 -3,637.80 5,962,329.91 687,848.88 70°18'6.825 N 148°28'42.09 W 10,490.32 86.35 321.91 8,673.89 1,478.99 -3,659.31 5,962,354.51 687,826.74 70° 18'7.072 N 148°28'42.72 W 10,527.35 86.53 326.82 8,676.19 1,509.02 -3,680.84 5,962,383.98 687,804.46 70° 18'7.367 N 148°28'43.35 W 10,553.13 86.72 331.69 8,677.71 1,531.13 -3,693.99 5,962,405.74 687,790.75 70°18'7.585 N 148°28'43.73 W, 10,579.64 85.30 334.99 8,679.56 1,554.76 -3,705.85 5,962,429.06 687,778.28 70°18'7.817 N 148°28'44.08 W 10,610.12 84.86 337.36 8,682.17 1,582.54 -3,718.12 5,962,456.52 687,765.31 70° 18'8.090 N 148°28'44.44 W 10,641.59 85.18 339.54 8,684.90 1,611.69 -3,729.64 5,962,485.37 687,753.06 70° 18'8.377 N 148°28'44.77 W 10,670.29 85.76 341.06 8,687.17 1,638.63 -3,739.28 5,962,512.05 687,742.73 70°18'8.642 N 148°28'45.05 W 10,703.30 86.78 339.25 8,689.32 1,669.61 -3,750.46 5,962,542.74 687,730.77 70° 18'8.946 N 148°28'45.38 W 10,734.46 87.79 336.26 8,690.79 1,698.42 -3,762.24 5,962,571.23 687,718.26 70° 18'9.230 N 148°28'45.72 W 10,773.34 87.27 333.92 8,692.47 1,733.64 -3,778.60 5,962,606.03 687,701.00 70°18'9.576 N 148°28'46.20 W 10,800.73 86.66 338.49 8,693.92 1,758.66 -3,789.64 5,962,630.76 687,689.34 70°18'9.822 N 148°28'46.52 W 10,830.36 86.80 341.46 8,695.61 1,786.45 -3,799.76 5,962,658.28 687,678.51 70° 18'10.095 N 148°28'46.82 W 10,860.59 88.01 346.25 8,696.98 1,815.45 -3,808.16 5,962,687.05 687,669.38 70° 18'10.381 N 148°28'47.07 W 10,890.22 87.09 350.64 8,698.25 1,844.45 -3,814.09 5,962,715.88 687,662.71 70° 18'10.666 N 148°28'47.24 W 10,920.33 87.21 354.78 8,699.75 1,874.27 -3,817.90 5,962,745.60 687,658.14 70° 18'10.959 N 148°28'47.35 W 10,951.02 87.73 0.03 8,701.10 1,904.89 -3,819.29 5,962,776.17 687,655.97 70°18'11.260 N 148°28'47.39 WI 10,979.96 87.33 4.45 8,702.35 1,933.77 -3,818.16 5,962,805.07 687,656.36 70° 18'11.544 N 148°28'47.36 W 11,025.00 87.33 4.45 8,704.45 1,978.63 -3,814.67 5,962,850.00 687,658.71 70° 18'11.985 N 148°28'47.26 W TD 10/26/2012 2:44:39PM Page 3 COMPASS 2003.16 Build 73 • • Vali, BAKER HUGHES INTEQ : . North America - ALASKA - BP Prudhoe Bay PB DS 18 18-27 18-27EPB2 Survey: 18-27EPB2 Survey Report - Geographic 26 October, 2012 arty BAKER0 - , HUGHES Survey Report- Geographic • bp ' INTEQ Company: North America-ALASKA-BP Local Co-ordinate Reference: Well 18-27 Project: Prudhoe Bay TVD Reference: 18-27C @ 53.35ft(Nordic 1) Site: PB DS 18 MD Reference: 18-27C @ 53.35ft(Nordic 1) Well: 18-27 North Reference: True Wellbore: 18-27EPB2 Survey Calculation Method: Minimum Curvature Design: 18-27EPB2 Database: EDM.16-ANC Prod-WH24P Project Prudhoe Bay,GPB,PRUDHOE BAY Map System: US State Plane 1927(Exact solution) System Datum: Mean Sea Level Geo Datum: NAD 1927(NADCON CONUS) Using Well Reference Point Map Zone: Alaska Zone 04 Using geodetic scale factor Site PB DS 18,TR-11-14 Site Position: Northing: 5,959,213.15ft Latitude: 70°17'35.252 N From: Map Easting: 691,583.44ft Longitude: 148°26'55.55 W Position Uncertainty: 0.00 ft Slot Radius: 0.000 in Grid Convergence: 1.46 ° I Well 18-27 API No 500292232100 Well Position +N/-S 0.00 ft Northing: 5,960,969.34 ft Latitude: 70° 17 52.535 N +E/-W 0.00 ft Easting: 691,522.34 ft Longitude: 148°26'56.03 W Position Uncertainty 0.00 ft Wellhead Elevation: ft Ground Level: 15.40ft . .._...-...-_....... . Wellbore 18-27EPB2 API No 500292232172 Magnetics Model Name Sample Date Declination Dip Angle Field Strength 1 (0) (°) (nT) BGGM2012 9/15/2012 20.91 81.04 57,640 Design 18-27EPB2 Audit Notes: Version: Phase: ACTUAL Tie On Depth: 10,773.34 Vertical Section: Depth From(TVD) +N/-S +E/-W Direction (ft) (ft) (ft) (0) 37.65 0.00 0.00 304.94 Survey Program Date: 10/15/2012 From To (ft) (ft) Survey(Wellbore) Tool Name Description 951.56 9,733.51 18-27 Srvy MWD(18-27) MWD MWD-Standard 9,830.00 10,294.09 18-27A Srvy MWD(18-27A) MWD MWD-Standard 10,300.50 10,773.34 MWD(18-27EPB1) MWD MWD-Standard 10,775.00 11,903.00 18-27EPB2(18-27EPB2) MWD MWD-Standard 10/26/2012 2:48:04PM Page 2 COMPASS 2003.16 Build 73 •BAKER !2 HUGHES Survey Report-Geographic bN 1NTEQ Company: North America-ALASKA-BP Local Co-ordinate Reference: Well 18-27 Project: Prudhoe Bay TVD Reference: 18-27C @ 53.35ft(Nordic 1) Site: PB DS 18 MD Reference: 18-27C @ 53.35ft(Nordic 1) Well: 18-27 North Reference: True Wellbore: 18-27EPB2 Survey Calculation Method: Minimum Curvature Design: 18-27EPB2 Database: EDM .16-ANC Prod-WH24P Survey Measured Vertical Map Map Depth Inclination Azimuth Depth +N/-S +E/-W Northing Easting (ft) (°) (°) (ft) (ft) (ft) (ft) (ft) Latitude Longitude 10,773.34 87.27 333.92 8,692.47 1,733.64 -3,778.60 5,962,606.03 687,701.00 70° 18'9.576 N 148°28'46.20 W TIP 10,775.00 87.23 334.20 8,692.55 1,735.14 -3,779.33 5,962,607.50 687,700.24 70° 18'9.591 N 148°28'46.22 W KOP 10,805.27 90.03 329.54 8,693.27 1,761.81 -3,793.59 5,962,633.80 687,685.30 70° 18'9.853 N 148°28'46.64 W 10,835.59 91.69 326.34 8,692.82 1,787.50 -3,809.68 5,962,659.07 687,668.57 70° 18'10.106 N 148°28'47.11 W 10,867.29 89.57 332.16 8,692.47 1,814.73 -3,825.88 5,962,685.88 687,651.68 70° 18'10.373 N 148°28'47.58 W 10,896.71 91.07 337.09 8,692.31 1,841.30 -3,838.48 5,962,712.12 687,638.40 70° 18'10.635 N 148°28'47.95 W 10,925.65 89.72 341.07 8,692.11 1,868.33 -3,848.81 5,962,738.87 687,627.39 70° 18'10.900 N 148°28'48.25 W 10,965.60 90.43 348.41 8,692.05 1,906.84 -3,859.32 5,962,777.10 687,615.90 70°18'11.279 N 148°28'48.56 W 11,000.49 90.77 354.25 8,691.69 1,941.32 -3,864.58 5,962,811.43 687,609.77 70°18'11.618 N 148°28'48.71 W' 11,030.67 91.14 358.67 8,691.18 1,971.43 -3,866.44 5,962,841.48 687,607.14 70° 18'11.914 N 148°28'48.77 W 11,060.71 91.66 3.94 8,690.45 2,001.44 -3,865.76 5,962,871.50 687,607.06 70° 18'12.209 N 148°28'48.75 W 11,090.63 90.18 8.51 8,689.97 2,031.17 -3,862.51 5,962,901.30 687,609.54 70° 18'12.502 N 148°28'48.65 W 11,120.52 90.06 11.97 8,689.91 2,060.58 -3,857.20 5,962,930.83 687,614.10 70° 18'12.791 N 148°28'48.50 W 11,150.46 91.78 7.69 8,689.43 2,090.07 -3,852.09 5,962,960.44 687,618.46 70° 18'13.081 N 148°28'48.35 W 11,180.47 90.06 5.14 8,688.94 2,119.88 -3,848.74 5,962,990.33 687,621.05 70°18'13.374 N 148°28'48.25 W 11,210.60 90.46 1.39 8,688.81 2,149.96 -3,847.02 5,963,020.44 687,622.00 70°18'13.670 N 148°28'48.20 W 11,241.77 89.60 357.43 8,688.79 2,181.12 -3,847.34 5,963,051.58 687,620.89 70° 18'13.977 N 148°28'48.21 W 11,270.73 89.17 352.94 8,689.10 2,209.97 -3,849.77 5,963,080.35 687,617.72 70° 18'14.260 N 148°28'48.28 W 11,300.79 89.63 349.28 8,689.42 2,239.66 -3,854.42 5,963,109.92 687,612.32 70° 18'14.552 N 148°28'48.42 W 11,330.07 88.19 345.51 8,689.97 2,268.22 -3,860.81 5,963,138.31 687,605.21 70° 18'14.833 N 148°28'48.61 W 11,360.33 87.91 350.44 8,691.00 2,297.79 -3,867.10 5,963,167.70 687,598.16 70° 18'15.124 N 148°28'48.79 W 11,390.53 88.31 356.26 8,692.00 2,327.76 -3,870.60 5,963,197.57 687,593.90 70°18'15.419 N 148°28'48.89 W 11,421.68 88.34 358.67 8,692.91 2,358.87 -3,871.98 5,963,228.63 687,591.73 70°18'15.725 N 148°28'48.93 W 11,450.43 88.01 355.44 8,693.83 2,387.56 -3,873.45 5,963,257.27 687,589.53 70° 18'16.007 N 148°28'48.98 W 11,480.09 88.62 352.13 8,694.70 2,417.03 -3,876.66 5,963,286.65 687,585.57 70° 18'16.297 N 148°28'49.07 W 11,510.49 90.71 356.31 8,694.88 2,447.26 -3,879.72 5,963,316.80 687,581.74 70° 18'16.594 N 148°28'49.16 WI 11,540.39 93.10 1.15 8,693.88 2,477.13 -3,880.38 5,963,346.63 687,580.32 70° 18'16.888 N 148°28'49.18 W 11,570.33 92.61 0.23 8,692.39 2,507.03 -3,880.02 5,963,376.53 687,579.91 70° 18'17.182 N 148°28'49.17 W 11,599.89 92.06 355.16 8,691.19 2,536.53 -3,881.21 5,963,405.99 687,577.97 70°18'17.472 N 148°28'49.21 W 11,630.13 94.27 351.62 8,689.52 2,566.52 -3,884.69 5,963,435.88 687,573.74 70°18'17.767 N 148°28'49.31 W 11,660.57 96.86 347.47 8,686.56 2,596.30 -3,890.18 5,963,465.51 687,567.49 70°18'18.060 N 148°28'49.47 W 11,696.39 95.96 340.56 8,682.56 2,630.50 -3,899.98 5,963,499.45 687,556.82 70° 18'18.396 N 148°28'49.75 W 11,720.59 95.69 337.06 8,680.10 2,652.94 -3,908.68 5,963,521.66 687,547.55 70° 18'18.617 N 148°28'50.01 W' 11,750.54 97.53 332.03 8,676.65 2,679.80 -3,921.46 5,963,548.18 687,534.09 70° 18'18.881 N 148°28'50.38 W 11,780.57 100.21 328.12 8,672.02 2,705.51 -3,936.25 5,963,573.50 687,518.65 70°18'19.134 N 148°28'50.81 W 11,812.03 100.61 322.66 8,666.33 2,730.96 -3,953.82 5,963,598.50 687,500.44 70° 18'19.384 N 148°28'51.33 W 11,843.47 99.55 321.34 8,660.83 2,755.36 -3,972.88 5,963,622.40 687,480.77 70° 18'19.624 N 148°28'51.88 W 11,903.00 99.50 321.34 8,650.98 2,801.20 -4,009.55 5,963,667.29 687,442.94 70° 18'20.074 N 148°28'52.95 W TD 10/26/2012 2:48:04PM Page 3 COMPASS 2003.16 Build 73 RECEIVED STATE OF ALASKA NOV 2 0 2012 ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOB`OGCC la. Well Status: ®Oil 0 Gas 0 SPLUG ❑Other 0 Abandoned 0 Suspended 1b. Well Class 20AAC 25 105 20AAC 25 110 0 Exploratory 0 Stratigraphic 0 GINJ 0 WINJ 0 WAG 0 WDSPL 0 Other No.of Completions . ®Development 0 Service 2. Operator Name: 5.Date Comp.,Susp.,or Aband.: 12. Permit to Drill Number: BP Exploration(Alaska) Inc. 10/26/2012 212-131 • • 3. Address: 6. Date Spudded: 13. API Number P.O. Box 196612,Anchorage,Alaska 99519-6612 _ 10/11/2012 50-029-22321-05-00 - 4a. Location of Well(Governmental Section): 7. D_ate T.D. Reached: 14. Well Name and Number: Surface: 10/19/2012 PBU 18-27E ' 893'FNL,236' FEL, Sec.24,T11 N, R14E, UM 8. KB(ft above MSL): 53.35' • 15. Field/Pool(s) Top of Productive Horizon: 772'FSL,4048' FEL, Sec. 13,T11 N, R14E, UM GL(ft above MSL): 15.7' Prudhoe Bay/Prudhoe Bay • Total Depth: (3 9.Plug Back Depth(MD+TVD) 3011'FSL,4792'FEL, Sec. 1'+4,T11N, R14E, UM , 13152' 8672' 4b. Location of Well(State Base Plane Coordinates,NAD: 10.Total Depth(MD+TVD) 16. Property Designation: Surface: x- 691522 y- 5960969 Zone- ASP4 . 13187' 8671' • ADL 028307 • TPI: x- 687669 y- 5962538 Zone- ASP4 11.SSSV Depth(MD+TVD) 17. Land Use Permit: Total Depth:x- 686869 y- 5964758 Zone- ASP4 None 19 Water depth,if offshore' 20. Thickness of Permafrost(TVD): 18. Directional Survey: ®Yes ❑No (Submit electronic and printed information per 20 AAC 25.050) N/A ft MSL 1900'(Approx.) 21.Logs Obtained (List all logs here and submit electronic and printed information per 20 AAC 25.071): 22 Re-Drill/Lateral Top Window MD/TVD: MWD/GR/RES, GR/CCL/MCNL 10301' 8660' 23. CASING,LINER AND CEMENTING RECORD SETTING DEPTH MD SETTING DEPTH ND HOLE AMOUNT CASING WT PER FT. GRADE TOP BOTTOM TOP BOTTOM SIZE CEMENTING RECORD PULLED 20" 91.5# _ H-40 Surface_ 110' _Surface 110' 30" 2000#Coldset II 13-3/8" _ 68# K-55/L-80 Surface 3497' Surface 3497' 16" 2706 cu ft CS III,460 cu ft Class'G' _ 9-5/8" 47# L-80 Surface 9069' Surface 8259' 12-1/2" 2217 cu ft Class'G' _ 7" 26# NT8OS 8829' _ 9827' 8110' 8618' 8-1/2" 398 cu ft Class'G' 4-1/2" 12.6# _ L-80 , 8678' 10301' 8011' 8660' 6" 832 cu ft Class'G' 3-1/2"x3-1/4"x2-7/8" 9 3N/6 6#/6 5# L-80 8680' 13187' 8013' 8671' 4-1/4"x 4-1/8" 175 sx Class'G' ir 24. Open to production or injection? ®Yes 0 No 25. TUBING RECORD If Yes,list each interval open SIZE DEPTH SET(MD) PACKER SET(MD/ND (MD+TVD of Top&Bottom;Perforation Size and Number): ) 2"Gun Diameter,6 spf 4-1/2", 12.6#, L-80 8684' 8629'/7978' 26. ACID,FRACTURE,CEMENT SQUEEZE,ETC. 11800'-11870' 8674'-8677' WAS HYDRAULIC FRACTURING USED DURING COMPLETION?❑Yes ®No 11900'-11980' 8676'-8678' -- L c••:,v, 12040'-12490' 8677'-8675' `; i' ' •. i. DEPTH INTERVAL(MD AMOUNT AND KIND OF MATERIAL USED 12770'-12980' 8675'-8676' ` 2500' Freeze Protect w/38 Bbls of Diesel 13040'-13130' 8673'-8672' • 4,i rn,l 27. PRODUCTION TEST Date First Production Method of Operation(Flowing,Gas Lift,etc November 14,2012 Flowing Date of Test Hours Tested Production For OIL-BBL: GAS-MCF: WATER-BBL: CHOKE SIZE. GAS-OIL RATIO: 11/14/2012 8 Test Period 4 1550 966 4 128 624 Flow Tubing Casing Press: Calculated OIL-BBL: GAS-MCF: WATER-BBL' OIL GRAVITY-API(CORR): Press. 0 1220 24-Hour Rate 4 4649 2899 11 30.8 28. CORE DATA Conventional Core(s)Acquired? 0 Yes ®No . Sidewall Core(s)Acquired? 0 Yes ®No 1 If Yes to either question,list formations and intervals cored(MD+TVD of top and bottom of each),and summarize lithology and presence of oil,gas or water (submit separate sheets with this form,if needed). Submit detailed descriptions,core chips,photographs and laboratory analytical results per 20 AAC 250.071. None e L' • ','i,:. . 'I 2 17x1,2 Form 10-407 Revised 10/2012 CONTINUED ON REVERSE /.3.13Submit Original Only G C ,4)x2., 3 �j 29. GEOLOGIC MARKERS(List all formations an irkers encounter 30 FORMATION TESTS NAME j ND Well Tested i J Yes ®No Permafrost Top If yes,list intervals and formations tested,briefly summarizing test Permafrost Base results Attach separate sheets to this form,if needed,and submit detailed test information per 20 AAC 25.071. Zone 1B 10332' 8662' None TDF I Zone 1A 10734' 8687' Formation at Total Depth: Zone 1A 10734' 8687' 31.List of Attachment Summary of Daily Drilling Reports,Well Schematic Diagram,Surveys 32. I hereby certify that the foregoing is true and correct to the best of my knowledge Contact: Troy Jakabosky,564-486 ,yak @bp.com Email: lastufjn@bp.com Printed Name Title: Drilling Technologist Joe La tufk� Signature: Phone 564-4091 Date. 11 /2-0I I Z INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. Item la: Classification of Service Wells. Gas Injection,Water Injection,Water-Alternating-Gas Injection,Salt Water Disposal,Water Supply for Injection, Observation,or Other Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. Item 4b. TPI(Top of Producing Interval). Item 8: The Kelly Bushing and Ground Level elevation in feet above mean sea level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. Item 13• The API number reported to AOGCC must be 14 digits(ex: 50-029-20123-00-00). Item 20: Report true vertical thickness of permafrost in Box 20. Provide MD and ND for the top and base of permafrost in Box 28. Item 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. Item 24• If this well is completed for separate production from more than one interval(multiple completion),so state in item 1,and in item 23 show the producing intervals for only the interval reported in item 26 (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Item 27. Method of Operation: Flowing,Gas Lift,Rod Pump, Hydraulic Pump,Submersible,Water Injection,Gas Injection,Shut-In,or Other(explain) Item 28• Provide a listing of intervals cored and the corresponding formations,and a brief description in this box. Submit detailed description and analytical laboratory information required by 20 AAC 25.071. Item 30. Provide a listing of intervals tested and the corresponding formation,and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Form 10-407 Revised 10/2012 Submit Original Only TREE= 4-1/16'FMC WELLHEAD- FMC 18 2 71 E SAFE DOTES: WELL ANGLE>70°@ 9830'. ACTUATOR= BAKER C INITIAL&"A"NOT SHOWN BELOW MILLOUT @ KVITIAL KB.ELEV= 50.90' J M D DRAFT 9827'.ST"B","C"&"D"NOT SHOWN BELOW BF.ELEV NA MILLOUTt 10301""" KOP= 4000' Max Angle= 97°@ 11055' Datum MD= NtA O 2223' -I4-112"CA MCO BAL-OSSSVN,ID=3.812* Datum TV D= 8800'SS GAS LIFT MANDRELS ST MD TVD DEV TY FE VLV LATCH PORT DATE 11 �� 1 2986 2986 1 WAG DOSE RK 16 10/29/12 13-3/8"CSG,68#,L-80 BTD,ID=12.415" - 3497' 7I 1 I 2 5308 5198 28 MMG SO RK 20 10/29/12 -- - 1_11 3 7260 6898 29 MG DMY RK 0 08/18/05 4 8439 7839 42 MMIC MY RK 0 08/18/05 Minimum ID = 2.370" @ 8680" g 8629' -9-5/8"x 4-112"BKR S-3 NCR ID=3.875" 4-112" KB LTP ■ ' 8662' -I4-1/2"HES X NP,ID=3.813' 4-1/2"KB LTP,D=2.370" - 8680' ■ 8678' H TOP OF BKR TIEBACK SLV,ID=7.50" 4-1/2"TBG, 12.6#,L-80,.0152 bpf,ID=3.958" - 8684' 8684' I-I4-112"WLEG,ID=3.958" BEHIND _, ., CT LNR 3.70"DEFLOY MENT SLEEVE,ID=3.00" H 8691' M C8684' 9-5/8"X 7"BKR ZXP PKR ID=6.30" TOP OF 4-1/2'LNR H 8698' 8 ii 8692' _49-5/8"X 7"BKR HMC LNR HGR,D=6.25" 9-5/8"CSG,47#,L-80 BTRS,ID=8.681" H 9069' I { 8699' -17"X 4-1/2"XO,ID=3.937" l I 8707' -13-1/2"HES X NIP,ID=2.813" 3-1/2"LNR,9.3#,L-80 STL, - 9618' .0087 bpf,ID=2.992" 8829' H TOP OF TM/TIEBACK SLEEVE 3-1/2"LNR,9.3#,L-80 STL, -{ 9672' 8838' -19-5/8"X 7"TMVS 6 PKR BEHIND .0087 bpf,ID=2.992" ' 8842' -19-5/8"X 7"TM/DTH-S LNR HGR CT LNR 9204' H4-1/2"HES X NP,ID=3.813" 7"MILLOUT WINDOW(18-27A)9827-9850' 9618' -3-1/2"X 2-7/8",ID=2.377" 7"LNR,264,NT80 NSCC,.0383 bpf, -{ 9827' 9620' H 3.70"DEPLOYMENT SLEEVE,ID=3.00" ID=6.276" 4-1/2"WHIPSTOCK(10/09/12) - 10300' 9672' 1-I3-1/2"X 3-3/16"XO,ID=2.786" 4-1/2"LNR, 12.64,L-80 IBT,.0158 hpf,ID=3.958" --10300 10008' H4-1/2"HES X NP,D=3.813" BEHIND CTLNR PERFORATION SUMMARY REF LOG:SWS MEMORY GR/CCL ON 10/04/00 4-112"MLLOUT WINDOW(18-27E)10301'-10310' vz ANGLE AT TOP FERE:88°@ 11800' Note:Refer to Reduction DB for historical perf data SIZE SPF INTERVAL Opn/Sgz SHOT SQZ 2" 6 11800-11870 0 10/23/12 11698' --13-3/16"X 2-7/8"XO,ID=2.377" I/ 2" 6 11900-11980 0 10/23/12 2" 6 12040-12490 0 10/23/12 2" 6 12770-12980 0 10/23/12 I 2" 6 13040-13130 0 10/23/12 I 3-1/4 LNR,6.6#,L-80 STL,.0079,ID=2.85" -{ 11698' I PEIM --1 13152' 2-7/8"LNR,6.5#,L-80 STL,-0058,ID=2.441" H 13187' El DATE REV BY COMvETTfS DATE REV BY COMMENTS FRUDHOE BAY UNIT 02/23/93 INITIAL COMPLETBON 11/05/12 JMD DRLG HO CORRECTIONS WELL 18-27E 04!11/98 D-9 SIDETRACK (18-27A) "11/05/12 TBD/JMD GLV CIO(10/29/12) FEN T `L121310 11101/98 N-CDR1 CTD SIDETRACK (18-27B) 11/05/12 PJC LEGEND CORRECTION AR Na: 50-029-22321-05 • 10/18/00 N-CDR1 CTD SIDETRACK (18-27C) 11/06/12�PJCUMD DWG CORRECTIONS SEC 24,T11N,R14E,893'FNL&236'FEL 09/28105 NORDICI CTD SIDETRACK(18-270) 10/26/12 NORDIC1 CTD SIDETRACK(18-27QBP Exploration(Alaska) BAKER HUGHES INTEQ North America - ALASKA - BP Prudhoe Bay PB DS 18 18-27 18-27E Survey: MWD Survey Report - Geographic 26 October, 2012 /aaRI BAKER HUGHES Survey Report-Geographic 0 bp INTEQ Company: North America-ALASKA-BP Local Co-ordinate Reference: Well 18-27 Project: Prudhoe Bay TVD Reference: 18-27C @ 53.35ft(Nordic 1) Site: PB DS 18 MD Reference: 18-27C @ 53.35ft(Nordic 1) Well: 18-27 North Reference: True Wellbore: 18-27E Survey Calculation Method: Minimum Curvature Design: 18-27E Database: EDM.16-ANC Prod-WH24P Project Prudhoe Bay,GPB,PRUDHOE BAY Map System: US State Plane 1927(Exact solution) System Datum: Mean Sea Level Geo Datum: NAD 1927(NADCON CONUS) Using Well Reference Point Map Zone: Alaska Zone 04 Using geodetic scale factor Site PB DS 18,TR-11-14 Site Position: Northing: 5,959,213.15ft Latitude: 70°17'35.252 N From: Map Easting: 691,583.44ft Longitude: 148°26'55.55 W Position Uncertainty: 0.00 ft Slot Radius: 0.000in Grid Convergence: 1.46 ° Well 18-27 API No 500292232100 Well Position +N/-S 0.00 ft Northing: 5,960,969.34 ft Latitude: 70°17'52.535 N +E/-W 0.00 ft Easting: 691,522.34 ft Longitude: 148°26'56.03 W Position Uncertainty 0.00 ft Wellhead Elevation: ft Ground Level: 15.40 ft Wellbore 18-27E API No 500292232105 Magnetics Model Name Sample Date Declination Dip Angle Field Strength (°) (°) (nT) BGGM2012 9/15/2012 20.91 81.04 57,640 Design 18-27E Audit Notes: Version: 1.0 Phase: ACTUAL Tie On Depth: 10,490.32 Vertical Section: Depth From(TVD) +N/-S +E/-W Direction (ft) (ft) (ft) (1 37.65 0.00 0.00 310.59 Survey Program Date: 10/22/2012 From To (ft) (ft) Survey(Wellbore) Tool Name Description 951.56 9,733.51 18-27 Srvy MWD(18-27) MWD MWD-Standard 9,830.00 10,294.09 18-27A Srvy MWD(18-27A) MWD MWD-Standard 10,300.50 10,490.32 MWD(18-27EPB1) MWD MWD-Standard 10,501.00 13,187.00 MWD(18-27E) MWD MWD-Standard 10/26/2012 2:53:51PM Page 2 COMPASS 2003.16 Build 73 n..I BAKER HUGHES Survey Report-Geographic 0 bP INTEQ Company: North America-ALASKA-BP Local Co-ordinate Reference: Well 18-27 Project: Prudhoe Bay TVD Reference: 18-27C @ 53.35ft(Nordic 1) Site: PB DS 18 MD Reference: 18-27C @ 53.35ft(Nordic 1) Well: 18-27 North Reference: True Wellbore: 18-27E Survey Calculation Method: Minimum Curvature Design: 18-27E Database: EDM.16-ANC Prod-WH24P Survey Measured Vertical Map Map Depth Inclination Azimuth Depth +N/-S +E/-W Northing Easting (ft) (0) (0) (ft) (ft) (ft) (ft) (ft) Latitude Longitude 10,490.32 86.35 321.91 8,673.89 1,478.99 -3,659.31 5,962,354.51 687,826.74 70°18'7.072 N 148°28'42.72 W li TIP 10,501.00 86.40 323.33 8,674.57 1,487.46 -3,665.78 5,962,362.81 687,820.06 70°18'7.155 N 148°28'42.91 W KOP 10,530.26 89.39 318.82 8,675.64 1,510.20 -3,684.15 5,962,385.07 687,801.12 70°18'7.379 N 148°28'43.45 W 10,560.45 91.26 316.44 8,675.47 1,532.50 -3,704.49 5,962,406.85 687,780.21 70°18'7.598 N 148°28'44.04 W 10,590.52 88.41 312.69 8,675.56 1,553.59 -3,725.91 5,962,427.39 687,758.27 70°18'7.806 N 148°28'44.66 W 10,620.57 86.13 314.66 8,676.99 1,574.32 -3,747.62 5,962,447.55 687,736.04 70°18'8.009 N 148°28'45.30 W 10,650.63 86.07 320.16 8,679.04 1,596.39 -3,767.90 5,962,469.10 687,715.20 70°18'8.226 N 148°28'45.89 W 10,680.46 83.70 325.47 8,681.70 1,620.05 -3,785.86 5,962,492.29 687,696.65 70°18'8.459 N 148°28'46.41 W 10,710.33 84.16 330.43 8,684.86 1,645.21 -3,801.61 5,962,517.04 687,680.26 70°18'8.706 N 148°28'46.87 W 10,740.41 85.18 334.69 8,687.65 1,671.79 -3,815.41 5,962,543.26 687,665.79 70°18'8.968 N 148°28'47.27 W 10,770.66 88.31 338.78 8,689.37 1,699.53 -3,827.33 5,962,570.68 687,653.16 70°18'9.240 N 148°28'47.62 W 10,800.65 90.37 339.07 8,689.72 1,727.51 -3,838.12 5,962,598.37 687,641.67 70°18'9.515 N 148°28'47.94 WI 10,830.59 91.60 334.67 8,689.20 1,755.03 -3,849.87 5,962,625.59 687,629.22 70°18'9.786 N 148°28'48.28 W 10,860.53 92.00 330.60 8,688.26 1,781.60 -3,863.62 5,962,651.80 687,614.79 70°18'10.047 N 148°28'48.68 W 10,890.47 89.36 330.21 8,687.91 1,807.63 -3,878.41 5,962,677.44 687,599.35 70°18'10.303 N 148°28'49.11 W 10,920.51 86.81 335.37 8,688.91 1,834.32 -3,892.13 5,962,703.77 687,584.95 70°18'10.566 N 148°28'49.51 W 10,950.48 85.52 341.10 8,690.92 1,862.08 -3,903.22 5,962,731.23 687,573.17 70°18'10.839 N 148°28'49.84 W 10,980.71 86.50 345.87 8,693.02 1,890.98 -3,911.79 5,962,759.91 687,563.86 70°18'11.123 N 148°28'50.09 W 11,010.33 84.78 349.98 8,695.27 1,919.85 -3,917.96 5,962,788.61 687,556.95 70°18'11.407 N 148°28'50.27 W 11,040.47 88.86 354.90 8,696.95 1,949.67 -3,921.92 5,962,818.32 687,552.24 70° 18'11.700 N 148°28'50.38 W 11,070.25 91.69 359.65 8,696.80 1,979.41 -3,923.33 5,962,848.00 687,550.07 70° 18'11.992 N 148°28'50.43 WI 11,100.35 93.72 5.17 8,695.38 2,009.43 -3,922.07 5,962,878.05 687,550.56 70°18'12.288 N 148°28'50.39 W 11,130.38 90.34 8.74 8,694.32 2,039.21 -3,918.44 5,962,907.91 687,553.44 70°18'12.581 N 148°28'50.28 W 11,160.30 91.41 12.72 8,693.86 2,068.60 -3,912.87 5,962,937.43 687,558.25 70°18'12.870 N 148°28'50.12 W I 11,190.30 93.10 8.60 8,692.68 2,098.05 -3,907.32 5,962,967.01 687,563.05 70°18'13.159 N 148°28'49.96 W 11,220.41 94.05 4.45 8,690.80 2,127.90 -3,903.91 5,962,996.94 687,565.70 70°18'13.453 N 148°28'49.86 W 11,250.39 96.75 0.65 8,687.98 2,157.71 -3,902.58 5,963,026.77 687,566.27 70°18'13.746 N 148°28'49.82 W 11,280.33 96.37 354.74 8,684.56 2,187.42 -3,903.78 5,963,056.44 687,564.32 70°18'14.038 N 148°28'49.86 W 11,310.36 96.79 351.22 8,681.11 2,217.02 -3,907.42 5,963,085.93 687,559.92 70°18'14.329 N 148°28'49.97 W 11,341.44 94.70 351.41 8,678.00 2,247.59 -3,912.09 5,963,116.37 687,554.47 70°18'14.630 N 148°28'50.10 W 11,372.45 92.21 356.34 8,676.13 2,278.35 -3,915.39 5,963,147.04 687,550.39 70°18'14.933 N 148°28'50.20 W 11,401.95 91.56 0.47 8,675.16 2,307.82 -3,916.21 5,963,176.47 687,548.82 70°18'15.222 N 148°28'50.22 W 11,430.37 90.86 4.38 8,674.56 2,336.20 -3,915.01 5,963,204.88 687,549.30 70°18'15.502 N 148°28'50.19 W 11,460.38 90.12 9.04 8,674.30 2,366.00 -3,911.50 5,963,234.75 687,552.04 70°18'15.795 N 148°28'50.09 W 11,500.44 91.78 4.96 8,673.64 2,405.74 -3,906.62 5,963,274.61 687,555.91 70°18'16.186 N 148°28'49.95 W' 11,530.63 91.26 0.56 8,672.84 2,435.88 -3,905.17 5,963,304.77 687,556.59 70°18'16.482 N 148°28'49.90 W 11,560.19 90.92 356.07 8,672.28 2,465.41 -3,906.04 5,963,334.27 687,554.97 70°18'16.772 N 148°28'49.93 W 11,590.19 91.44 352.62 8,671.66 2,495.26 -3,908.99 5,963,364.02 687,551.26 70°18'17.066 N 148°28'50.02 W li 11,620.57 90.52 349.64 8,671.14 2,525.27 -3,913.68 5,963,393.90 687,545.81 70°18'17.361 N 148°28'50.15 W 11,650.67 90.86 344.83 8,670.78 2,554.61 -3,920.32 5,963,423.07 687,538.42 70°18'17.650 N 148°28'50.35 W 11,680.79 89.42 340.94 8,670.70 2,583.39 -3,929.19 5,963,451.61 687,528.82 70°18'17.933 N 148°28'50.61 W 11,710.11 88.37 336.82 8,671.27 2,610.73 -3,939.75 5,963,478.67 687,517.57 70° 18'18.201 N 148°28'50.91 W 11,740.53 88.28 332.25 8,672.16 2,638.18 -3,952.82 5,963,505.77 687,503.81 70° 18'18.471 N 148°28'51.30 W 11,770.60 87.91 326.70 8,673.16 2,664.05 -3,968.08 5,963,531.25 687,487.89 70° 18'18.726 N 148°28'51.74 W 11,800.75 88.37 322.17 8,674.14 2,688.56 -3,985.60 5,963,555.30 687,469.75 70° 18'18.967 N 148°28'52.25 W 11,830.55 87.21 317.71 8,675.29 2,711.35 -4,004.76 5,963,577.59 687,450.02 70°18'19.191 N 148°28'52.81 W 11,860.40 88.23 317.98 8,676.47 2,733.46 -4,024.77 5,963,599.18 687,429.45 70°18'19.408 N 148°28'53.40 W 11,890.63 91.35 325.60 8,676.59 2,757.19 -4,043.46 5,963,622.43 687,410.17 70°18'19.641 N 148°28'53.94 W 11,922.15 89.14 331.34 8,676.45 2,784.04 -4,059.93 5,963,648.85 687,393.02 70°18'19.905 N 148°28'54.42 W 11,949.85 88.07 334.07 8,677.13 2,808.65 -4,072.63 5,963,673.13 687,379.70 70°18'20.147 N 148°28'54.79 W 11,979.81 89.66 340.12 8,677.72 2,836.23 -4,084.28 5,963,700.40 687,367.35 70°18'20.418 N 148°28'55.13 W 12,010.53 89.85 344.75 8,677.85 2,865.51 -4,093.55 5,963,729.43 687,357.33 70°18'20.706 N 148°28'55.40 W 12,040.58 92.02 351.40 8,677.36 2,894.89 -4,099.75 5,963,758.64 687,350.38 70°18'20.995 N 148°28'55.58 W 10/26/2012 2:53:51PM Page 3 COMPASS 2003.16 Build 73 Mill BAKER HUGHES Survey Report-Geographic 0 by INTEQ Company: North America-ALASKA-BP Local Co-ordinate Reference: Well 18-27 Project: Prudhoe Bay TVD Reference: 18-27C @ 53.35ft(Nordic 1) Site: PB DS 18 MD Reference: 18-27C @ 53.35ft(Nordic 1) Well: 18-27 North Reference: True Wellbore: 18-27E Survey Calculation Method: Minimum Curvature Design: 18-27E Database: EDM.16-ANC Prod-WH24P Survey Measured Vertical Map Map Depth Inclination Azimuth Depth +N/-5 +EI-W Northing Easting (ft) (°) (°) (ft) (ft) (ft) (ft) (ft) Latitude Longitude 12,070.50 90.31 355.64 8,676.75 2,924.60 -4,103.13 5,963,788.26 687,346.25 70°18'21.287 N 148°28'55.68 W 12,100.55 89.39 0.97 8,676.83 2,954.63 -4,104.02 5,963,818.25 687,344.60 70°18'21.583 N 148°28'55.71 W 12,130.98 89.75 5.34 8,677.06 2,985.00 -4,102.34 5,963,848.65 687,345.50 70°18'21.881 N 148°28'55.66 W 12,161.83 91.17 2.29 8,676.81 3,015.78 -4,100.29 5,963,879.47 687,346.77 70°18'22.184 N 148°28'55.60 W 12,190.70 91.81 359.40 8,676.06 3,044.63 -4,099.87 5,963,908.32 687,346.46 70°18'22.468 N 148°28'55.59 W 12,220.59 91.50 355.59 8,675.20 3,074.48 -4,101.17 5,963,938.12 687,344.39 70°18'22.761 N 148°28'55.63 W 12,250.72 89.45 351.05 8,674.95 3,104.39 -4,104.67 5,963,967.94 687,340.13 70°18'23.056 N 148°28'55.73 W 12,282.37 89.85 347.35 8,675.14 3,135.47 -4,110.60 5,963,998.86 687,333.41 70°18'23.361 N 148°28'55.90 W 12,310.53 88.56 343.77 8,675.53 3,162.74 -4,117.62 5,964,025.93 687,325.69 70°18'23.629 N 148°28'56.11 W 12,340.59 90.09 340.11 8,675.88 3,191.31 -4,126.94 5,964,054.25 687,315.65 70°18'23.910 N 148°28'56.38 W 12,370.77 90.18 336.72 8,675.81 3,219.37 -4,138.04 5,964,082.02 687,303.84 70°18'24.186 N 148°28'56.71 W 12,400.61 90.31 332.95 8,675.69 3,246.37 -4,150.73 5,964,108.69 687,290.47 70°18'24.452 N 148°28'57.08 W 12,432.41 89.88 329.41 8,675.63 3,274.23 -4,166.06 5,964,136.14 687,274.44 70°18'24.726 N 148°28'57.52 W 12,460.85 90.28 326.31 8,675.59 3,298.30 -4,181.18 5,964,159.83 687,258.71 70°18'24.962 N 148°28'57.97 W 12,492.55 90.80 322.95 8,675.29 3,324.15 -4,199.53 5,964,185.20 687,239.71 70°18'25.216 N 148°28'58.50 W' 12,520.59 90.25 319.46 8,675.04 3,346.00 -4,217.09 5,964,206.59 687,221.59 70°18'25.431 N 148°28'59.01 W 12,550.29 90.55 315.37 8,674.83 3,367.86 -4,237.19 5,964,227.93 687,200.95 70°18'25.646 N 148°28'59.60 W 12,582.67 89.05 310.49 8,674.94 3,389.91 -4,260.89 5,964,249.36 687,176.70 70°18'25.863 N 148°29'0.29 W 12,610.83 89.26 313.40 8,675.36 3,408.73 -4,281.83 5,964,267.64 687,155.29 70°18'26.048 N 148°29'0.90 W 12,640.77 89.17 319.35 8,675.77 3,430.39 -4,302.47 5,964,288.77 687,134.10 70° 18'26.261 N 148°29'1.50 W 12,670.57 90.12 324.61 8,675.95 3,453.85 -4,320.82 5,964,311.76 687,115.16 70°18'26.491 N 148°29'2.04 W 12,700.46 90.28 320.75 8,675.85 3,477.62 -4,338.94 5,964,335.05 687,096.44 70° 18'26.725 N 148°29'2.57 W 12,731.25 90.92 317.51 8,675.53 3,500.90 -4,359.08 5,964,357.81 687,075.71 70° 18'26.954 N 148°29'3.16 W 12,760.77 90.12 316.53 8,675.26 3,522.49 -4,379.21 5,964,378.89 687,055.05 70° 18'27.166 N 148°29'3.74 W'. 12,790.67 89.42 322.45 8,675.38 3,545.22 -4,398.62 5,964,401.10 687,035.06 70° 18'27.390 N 148°29'4.31 W 12,820.71 89.33 326.91 8,675.71 3,569.72 -4,415.98 5,964,425.16 687,017.08 70° 18'27.630 N 148°29'4.82 W 12,850.35 89.60 331.18 8,675.98 3,595.13 -4,431.22 5,964,450.17 687,001.20 70° 18'27.880 N 148°29'5.26 W 12,880.95 89.02 335.84 8,676.35 3,622.51 -4,444.87 5,964,477.19 686,986.86 70° 18'28.149 N 148°29'5.66 W 12,910.66 88.80 339.88 8,676.92 3,650.02 -4,456.06 5,964,504.40 686,974.97 70° 18'28.420 N 148°29'5.99 W 12,940.77 90.00 344.30 8,677.23 3,678.66 -4,465.32 5,964,532.80 686,964.99 70° 18'28.702 N 148°29'6.26 W 12,971.85 91.87 347.83 8,676.73 3,708.81 -4,472.80 5,964,562.75 686,956.74 70° 18'28.998 N 148°29'6.48 W 13,002.46 94.64 345.07 8,674.99 3,738.52 -4,479.96 5,964,592.26 686,948.83 70° 18'29.290 N 148°29'6.69 W 13,031.08 91.96 342.15 8,673.34 3,765.92 -4,488.02 5,964,619.45 686,940.07 70° 18'29.560 N 148°29'6.92 W 13,060.67 90.86 338.33 8,672.61 3,793.76 -4,498.02 5,964,647.02 686,929.37 70°18'29.833 N 148°29'7.21 W 13,090.91 89.48 333.11 8,672.52 3,821.31 -4,510.45 5,964,674.25 686,916.24 70° 18'30.104 N 148°29'7.58 W 13,116.82 91.23 331.13 8,672.36 3,844.21 -4,522.56 5,964,696.83 686,903.55 70° 18'30.329 N 148°29'7.93 W 13,142.57 90.83 329.60 8,671.90 3,866.59 -4,535.29 5,964,718.87 686,890.25 70° 18'30.549 N 148°29'8.30 W 13,187.00 90.83 329.60 8,671.26 3,904.91 -4,557.77 5,964,756.60 686,866.80 70°18'30.926 N 148°29'8.96 W TD-2 7/8" 10/26/2012 2:53:51 PM Page 4 COMPASS 2003.16 Build 73 BAKER HUGHES INTEQ North America - ALASKA - BP Prudhoe Bay PB DS 18 18-27 18-27EPB1 Survey: MWD Survey Report - Geographic 26 October, 2012 bp NM BAKER 11 15 Survey Report-Geographic 0 bp INTEQ Company: North America-ALASKA-BP Local Co-ordinate Reference: Well 18-27 Project: Prudhoe Bay TVD Reference: 18-27C @ 53.35ft(Nordic 1) Site: PB DS 18 MD Reference: 18-27C @ 53.35ft(Nordic 1) Well: 18-27 North Reference: True Wellbore: 18-27EPB1 Survey Calculation Method: Minimum Curvature Design: 18-27EPB1 Database: EDM.16-ANC Prod-WH24P Project Prudhoe Bay,GPB,PRUDHOE BAY Map System: US State Plane 1927(Exact solution) System Datum: Mean Sea Level Geo Datum: NAD 1927(NADCON CONUS) Using Well Reference Point Map Zone: Alaska Zone 04 Using geodetic scale factor Site PB DS 18,TR-11-14 1 Site Position: Northing: 5,959,213.15ft Latitude: 70°17'35.252 N From: Map Easting: 691,583.44ft Longitude: 148°26'55.55 W Position Uncertainty: 0.00 ft Slot Radius: 0.000in Grid Convergence: 1.46 ° Well 18-27 API No 500292232100 Well Position +N/-S 0.00 ft Northing: 5,960,969.34 ft Latitude: 70°17'52.535 N +EI-W 0.00 ft Easting: 691,522.34ft Longitude: 148°26'56.03 W j Position Uncertainty 0.00 ft Wellhead Elevation: ft Ground Level: 15.40 ft Wellbore 18-27EPB1 API No 500292232171 Magnetics Model Name Sample Date Declination Dip Angle Field Strength (°) (°) (nT) BGGM2012 9/15/2012 20.91 81.04 57,640 Design 18-27EPB1 Audit Notes: Version: Phase: ACTUAL Tie On Depth: 10,294.09 Vertical Section: Depth From(TVD) +N/-S +E/-W Direction (ft) (ft) (ft) (°) 37.65 0.00 0.00 292.76 Survey Program Date: 10/15/2012 From To (ft) (ft) Survey(Wellbore) Tool Name Description 951.56 9,733.51 18-27 Srvy MWD(18-27) MWD MWD-Standard 9,830.00 10,294.09 18-27A Srvy MWD(18-27A) MWD MWD-Standard 10,300.50 11,025.00 MWD(18-27EPB1) MWD MWD-Standard 10/26/2012 2:44:39PM Page 2 COMPASS 2003.16 Build 73 BAKER HUGHES Survey Report-Geographic bp INTEQ Company: North America-ALASKA-BP Local Co-ordinate Reference: Well 18-27 Project: Prudhoe Bay TVD Reference: 18-27C @ 53.35ft(Nordic 1) Site: PB DS 18 MD Reference: 18-27C @ 53.35ft(Nordic 1) Well: 18-27 North Reference: True Wellbore: 18-27EPB1 Survey Calculation Method: Minimum Curvature Design: 18-27EPB1 Database: EDM.16-ANC Prod-WH24P Survey Measured Vertical Map Map Depth Inclination Azimuth Depth +Nl-S +E/-W Northing Easting (ft) (°) (°) (ft) (ft) (ft) (ft) (ft) Latitude Longitude 10,294.09 86.67 296.13 8,659.36 1,356.96 -3,508.45 5,962,236.37 687,980.65 70°18'5.873 N 148°28'38.32 W TIP 10,300.50 86.67 295.83 8,659.73 1,359.76 -3,514.20 5,962,239.03 687,974.83 70°18'5.900 N 148°28'38.49 W KOP 10,330.24 84.61 300.88 8,662.00 1,373.84 -3,540.29 5,962,252.43 687,948.40 70°18'6.039 N 148°28'39.25 W'. 10,360.71 84.21 306.08 8,664.97 1,390.56 -3,565.58 5,962,268.50 687,922.69 70°18'6.203 N 148°28'39.99 W 10,390.28 86.83 308.41 8,667.28 1,408.40 -3,589.04 5,962,285.74 687,898.79 70°18'6.378 N 148°28'40.67 W 10,428.40 85.61 313.83 8,669.79 1,433.41 -3,617.68 5,962,310.00 687,869.51 70°18'6.624 N 148°28'41.51 W 10,457.14 86.40 317.03 8,671.79 1,453.83 -3,637.80 5,962,329.91 687,848.88 70°18'6.825 N 148°28'42.09 W 10,490.32 86.35 321.91 8,673.89 1,478.99 -3,659.31 5,962,354.51 687,826.74 70°18'7.072 N 148°28'42.72 W 10,527.35 86.53 326.82 8,676.19 1,509.02 -3,680.84 5,962,383.98 687,804.46 70°18'7.367 N 148°28'43.35 W 10,553.13 86.72 331.69 8,677.71 1,531.13 -3,693.99 5,962,405.74 687,790.75 70°18'7.585 N 148°28'43.73 W 10,579.64 85.30 334.99 8,679.56 1,554.76 -3,705.85 5,962,429.06 687,778.28 70°18'7.817 N 148°28'44.08 W 10,610.12 84.86 337.36 8,682.17 1,582.54 -3,718.12 5,962,456.52 687,765.31 70°18'8.090 N 148°28'44.44 W 10,641.59 85.18 339.54 8,684.90 1,611.69 -3,729.64 5,962,485.37 687,753.06 70°18'8.377 N 148°28'44.77 W 10,670.29 85.76 341.06 8,687.17 1,638.63 -3,739.28 5,962,512.05 687,742.73 70°18'8.642 N 148°28'45.05 W 10,703.30 86.78 339.25 8,689.32 1,669.61 -3,750.46 5,962,542.74 687,730.77 70°18'8.946 N 148°28'45.38 W 10,734.46 87.79 336.26 8,690.79 1,698.42 -3,762.24 5,962,571.23 687,718.26 70°18'9.230 N 148°28'45.72 W 10,773.34 87.27 333.92 8,692.47 1,733.64 -3,778.60 5,962,606.03 687,701.00 70°18'9.576 N 148°28'46.20 W 10,800.73 86.66 338.49 8,693.92 1,758.66 -3,789.64 5,962,630.76 687,689.34 70°18'9.822 N 148°28'46.52 W 10,830.36 86.80 341.46 8,695.61 1,786.45 -3,799.76 5,962,658.28 687,678.51 70° 18'10.095 N 148°28'46.82 W 10,860.59 88.01 346.25 8,696.98 1,815.45 -3,808.16 5,962,687.05 687,669.38 70° 18'10.381 N 148°28'47.07 W 10,890.22 87.09 350.64 8,698.25 1,844.45 -3,814.09 5,962,715.88 687,662.71 70°18'10.666 N 148°28'47.24 W 10,920.33 87.21 354.78 8,699.75 1,874.27 -3,817.90 5,962,745.60 687,658.14 70° 18'10.959 N 148°28'47.35 W 10,951.02 87.73 0.03 8,701.10 1,904.89 -3,819.29 5,962,776.17 687,655.97 70° 18'11.260 N 148°28'47.39 WI 10,979.96 87.33 4.45 8,702.35 1,933.77 -3,818.16 5,962,805.07 687,656.36 70°18'11.544 N 148°28'47.36 W'i 11,025.00 87.33 4.45 8,704.45 1,978.63 -3,814.67 5,962,850.00 687,658.71 70°18'11.985 N 148°28'47.26 W TD 10/26/2012 2:44:39PM Page 3 COMPASS 2003.16 Build 73 BAKER HUGHES INTEQ North America - ALASKA - BP Prudhoe Bay PB DS 18 18-27 18-27EPB2 Survey: 18-27EPB2 Survey Report - Geographic 26 October, 2012 0 by Mill BAKER HUGHES Survey Report-Geographic 0 bp INTEQ Company: North America-ALASKA-BP Local Co-ordinate Reference: Well 18-27 Project: Prudhoe Bay TVD Reference: 18-27C @ 53.35ft(Nordic 1) Site: PB DS 18 MD Reference: 18-27C @ 53.35ft(Nordic 1) Well: 18-27 North Reference: True Wellbore: 18-27EPB2 Survey Calculation Method: Minimum Curvature Design: 18-27EPB2 Database: EDM.16-ANC Prod-WH24P Project Prudhoe Bay,GPB,PRUDHOE BAY Map System: US State Plane 1927(Exact solution) System Datum: Mean Sea Level Geo Datum: NAD 1927(NADCON CONUS) Using Well Reference Point Map Zone: Alaska Zone 04 Using geodetic scale factor Site PB DS 18,TR-11-14 Site Position: Northing: 5,959,213.15ft Latitude: 70°17'35.252 N From: Map Easting: 691,583.44ft Longitude: 148°26'55.55 W Position Uncertainty: 0.00 ft Slot Radius: 0.000in Grid Convergence: 1.46° Well 18-27 API No 500292232100 Well Position +N/-S 0.00 ft Northing: 5,960,969.34 ft Latitude: 70°17'52.535 NI +El-W 0.00 ft Easting: 691,522.3411 Longitude: 148°26'56.03 W Position Uncertainty 0.00 ft Wellhead Elevation: ft Ground Level: 15.40ft Wellbore 18-27EPB2 API No 500292232172 Magnetics Model Name Sample Date Declination Dip Angle Field Strength (°) (°) (nT) BGGM2012 9/15/2012 20.91 81.04 57,640 Design 18-27EPB2 Audit Notes: Version: Phase: ACTUAL Tie On Depth: 10,773.34 Vertical Section: Depth From(TVD) +N/-S +E/-W Direction (ft) (ft) (ft) (°) 37.65 0.00 0.00 304.94 Survey Program Date: 10/15/2012 From To (ft) (ft) Survey(Wellbore) Tool Name Description 951.56 9,733.51 18-27 Srvy MWD(18-27) MWD MWD-Standard 9,830.00 10,294.09 18-27A Srvy MWD(18-27A) MWD MWD-Standard 10,300.50 10,773.34 MWD(18-27EPB1) MWD MWD-Standard 10,775.00 11,903.00 18-27EPB2(18-27EPB2) MWD MWD-Standard 10/26/2012 2:48:04PM Page 2 COMPASS 2003.16 Build 73 BAKER NYOMES Survey Report-Geographic ()bp INTEQ Company: North America-ALASKA-BP Local Co-ordinate Reference: Well 18-27 Project: Prudhoe Bay ND Reference: 18-27C @ 53.35ft(Nordic 1) Site: PB DS 18 MD Reference: 18-27C @ 53.35ft(Nordic 1) Well: 18-27 North Reference: True Wellbore: 18-27EPB2 Survey Calculation Method: Minimum Curvature Design: 18-27EPB2 Database: EDM.16-ANC Prod-WH24P Survey Measured Vertical Map Map Depth Inclination Azimuth Depth +N/-S +El-W Northing Easting (ft) (0) (0) (ft) (ft) (ft) (ft) (ft) Latitude Longitude 10,773.34 87.27 333.92 8,692.47 1,733.64 -3,778.60 5,962,606.03 687,701.00 70°18'9.576 N 148°28'46.20 W TIP 10,775.00 87.23 334.20 8,692.55 1,735.14 -3,779.33 5,962,607.50 687,700.24 70°18'9.591 N 148°28'46.22 W KOP 10,805.27 90.03 329.54 8,693.27 1,761.81 -3,793.59 5,962,633.80 687,685.30 70°18'9.853 N 148°28'46.64 W 10,835.59 91.69 326.34 8,692.82 1,787.50 -3,809.68 5,962,659.07 687,668.57 70°18'10.106 N 148°28'47.11 W 10,867.29 89.57 332.16 8,692.47 1,814.73 -3,825.88 5,962,685.88 687,651.68 70°18'10.373 N 148°28'47.58 W 10,896.71 91.07 337.09 8,692.31 1,841.30 -3,838.48 5,962,712.12 687,638.40 70°18'10.635 N 148°28'47.95 W 10,925.65 89.72 341.07 8,692.11 1,868.33 -3,848.81 5,962,738.87 687,627.39 70°18'10.900 N 148°28'48.25 W 10,965.60 90.43 348.41 8,692.05 1,906.84 -3,859.32 5,962,777.10 687,615.90 70°18'11.279 N 148°28'48.56 W 11,000.49 90.77 354.25 8,691.69 1,941.32 -3,864.58 5,962,811.43 687,609.77 70°18'11.618 N 148°28'48.71 W 11,030.67 91.14 358.67 8,691.18 1,971.43 -3,866.44 5,962,841.48 687,607.14 70°18'11.914 N 148°28'48.77 W 11,060.71 91.66 3.94 8,690.45 2,001.44 -3,865.76 5,962,871.50 687,607.06 70°18'12.209 N 148°28'48.75 W 11,090.63 90.18 8.51 8,689.97 2,031.17 -3,862.51 5,962,901.30 687,609.54 70°18'12.502 N 148°28'48.65 W 11,120.52 90.06 11.97 8,689.91 2,060.58 -3,857.20 5,962,930.83 687,614.10 70°18'12.791 N 148°28'48.50 W 11,150.46 91.78 7.69 8,689.43 2,090.07 -3,852.09 5,962,960.44 687,618.46 70°18'13.081 N 148°28'48.35 W 11,180.47 90.06 5.14 8,688.94 2,119.88 -3,848.74 5,962,990.33 687,621.05 70°18'13.374 N 148°28'48.25 W 11,210.60 90.46 1.39 8,688.81 2,149.96 -3,847.02 5,963,020.44 687,622.00 70°18'13.670 N 148°28'48.20 W' 11,241.77 89.60 357.43 8,688.79 2,181.12 -3,847.34 5,963,051.58 687,620.89 70°18'13.977 N 148°28'48.21 W 11,270.73 89.17 352.94 8,689.10 2,209.97 -3,849.77 5,963,080.35 687,617.72 70°18'14.260 N 148°28'48.28 W 11,300.79 89.63 349.28 8,689.42 2,239.66 -3,854.42 5,963,109.92 687,612.32 70° 18'14.552 N 148°28'48.42 W 11,330.07 88.19 345.51 8,689.97 2,268.22 -3,860.81 5,963,138.31 687,605.21 70° 18'14.833 N 148°28'48.61 W 11,360.33 87.91 350.44 8,691.00 2,297.79 -3,867.10 5,963,167.70 687,598.16 70° 18'15.124 N 148°28'48.79 W 11,390.53 88.31 356.26 8,692.00 2,327.76 -3,870.60 5,963,197.57 687,593.90 70° 18'15.419 N 148°28'48.89 W 11,421.68 88.34 358.67 8,692.91 2,358.87 -3,871.98 5,963,228.63 687,591.73 70° 18'15.725 N 148°28'48.93 W 11,450.43 88.01 355.44 8,693.83 2,387.56 -3,873.45 5,963,257.27 687,589.53 70° 18'16.007 N 148°28'48.98 W 11,480.09 88.62 352.13 8,694.70 2,417.03 -3,876.66 5,963,286.65 687,585.57 70° 18'16.297 N 148°28'49.07 W 11,510.49 90.71 356.31 8,694.88 2,447.26 -3,879.72 5,963,316.80 687,581.74 70° 18'16.594 N 148°28'49.16 W 11,540.39 93.10 1.15 8,693.88 2,477.13 -3,880.38 5,963,346.63 687,580.32 70° 18'16.888 N 148°28'49.18 W'. 11,570.33 92.61 0.23 8,692.39 2,507.03 -3,880.02 5,963,376.53 687,579.91 70°18'17.182 N 148°28'49.17 W' 11,599.89 92.06 355.16 8,691.19 2,536.53 -3,881.21 5,963,405.99 687,577.97 70°18'17.472 N 148°28'49.21 W 11,630.13 94.27 351.62 8,689.52 2,566.52 -3,884.69 5,963,435.88 687,573.74 70°18'17.767 N 148°28'49.31 W 11,660.57 96.86 347.47 8,686.56 2,596.30 -3,890.18 5,963,465.51 687,567.49 70°18'18.060 N 148°28'49.47 W 11,696.39 95.96 340.56 8,682.56 2,630.50 -3,899.98 5,963,499.45 687,556.82 70°18'18.396 N 148°28'49.75 W', 11,720.59 95.69 337.06 8,680.10 2,652.94 -3,908.68 5,963,521.66 687,547.55 70°18'18.617 N 148°28'50.01 W 11,750.54 97.53 332.03 8,676.65 2,679.80 -3,921.46 5,963,548.18 687,534.09 70°18'18.881 N 148°28'50.38 WI 11,780.57 100.21 328.12 8,672.02 2,705.51 -3,936.25 5,963,573.50 687,518.65 70°18'19.134 N 148°28'50.81 W 11,812.03 100.61 322.66 8,666.33 2,730.96 -3,953.82 5,963,598.50 687,500.44 70°18'19.384 N 148°28'51.33 W 11,843.47 99.55 321.34 8,660.83 2,755.36 -3,972.88 5,963,622.40 687,480.77 70°18'19.624 N 148°28'51.88 W 11,903.00 99.50 321.34 8,650.98 2,801.20 -4,009.55 5,963,667.29 687,442.94 70°18'20.074 N 148°28'52.95 W TD 10/26/2012 2:48:04PM Page 3 COMPASS 2003.16 Build 73 2-2A0 o Letter of Transmittal r' u BAKERDate: HUGHESDecember 20, 2012 To: From: State of Alaska AOGCC Baker Hughes INTEQ 333 W. 7th Ave., Suite 100 795 East 94th Avenue Anchorage, Alaska 99501 Anchorage, Alaska 99515 Bill Michaelson Please find enclosed the directional survey data for the following well(s): —18-27EPB1, 18-27EPB2, 18-27E 06-16A D-29A E-20B D-19C P-19L1PB1, P-19L1 P-12BL1 W-02B Z-07B Enclosed for each well(s): 2 hardcopy prints of directional survey reports 1 compact disk containing electronic survey files Please sign and return one copy of this transmittal form to: BP Exploration (Alaska) Inc. Petrotechnical Data Center, LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99508 to acknowledge receipt of this data. RECEIVED BY: 11 tate of Alaska AOGCC DATE: ZS d3 222100 BAKER HUGHES INTEQ North America - ALASKA - BP Prudhoe Bay PB DS 18 18-27 18-27E Survey: MWD Survey Report - Geographic 26 October, 2012 Øbp Mill BAKER HUGHES Survey Report- Geographic 0 bp INTEQ Company: North America-ALASKA-BP Local Co-ordinate Reference: Well 18-27 Project: Prudhoe Bay TVD Reference: 18-27C @ 53.35ft(Nordic 1) Site: PB DS 18 MD Reference: 18-27C @ 53.35ft(Nordic 1) Well: 18-27 North Reference: True Wellbore: 18-27E Survey Calculation Method: Minimum Curvature Design: 18-27E Database: EDM.16-ANC Prod-WH24P Project Prudhoe Bay,GPB,PRUDHOE BAY Map System: US State Plane 1927(Exact solution) System Datum: Mean Sea Level Geo Datum: NAD 1927(NADCON CONUS) Using Well Reference Point Map Zone: Alaska Zone 04 Using geodetic scale factor Site PB DS 18,TR-11-14 Site Position: Northing: 5,959,213.15ff Latitude: 70°17'35.252 N From: Map Easting: 691,583.44ft Longitude: 148°26'55.55 W Position Uncertainty: 0.00 ft Slot Radius: 0.000 in Grid Convergence: 1.46 ° Well 18-27 API No 500292232100 Well Position +N/-S 0.00 ft Northing: 5,960,969.34 ft Latitude: 70°17'52.535 N +E/-W 0.00 ft Easting: 691,522.34 ft Longitude: 148°26'56.03 W Position Uncertainty 0.00 ft Wellhead Elevation: ft Ground Level: 15.40ft Wellbore 18-27E API No 500292232105 • Magnetics Model Name Sample Date Declination Dip Angle Field Strength (0) (0) (nT) BGGM2012 9/15/2012 20.91 81.04 57,640 Design 18-27E Audit Notes: Version: 1.0 Phase: ACTUAL Tie On Depth: 10,490.32 Vertical Section: Depth From(TVD) +N/-S +E/-W Direction '.; (ft) (ft) (ft) (0) 37.65 0.00 0.00 310.59 Survey Program Date: 10/22/2012 From To (ft) (ft) Survey(Wellbore) Tool Name Description 951.56 9,733.51 18-27 Srvy MWD(18-27) MWD MWD-Standard 9,830.00 10,294.09 18-27A Srvy MWD(18-27A) MWD MWD-Standard 10,300.50 10,490.32 MWD(18-27EPB1) MWD MWD-Standard 10,501.00 13,187.00 MWD(18-27E) MWD MWD-Standard 10/26/20 12 2:53:51PM Page 2 COMPASS 2003.16 Build 73 , BAKER HUGHES Survey Report-Geographic 0 bp INTEQ Company: North America-ALASKA-BP Local Co-ordinate Reference: Well 18-27 Project: Prudhoe Bay TVD Reference: 18-27C @ 53.35ft(Nordic 1) Site: PB DS 18 MD Reference: 18-27C @ 53.35ft(Nordic 1) Well: 18-27 North Reference: True Wellbore: 18-27E Survey Calculation Method: Minimum Curvature Design: 18-27E Database: EDM .16-ANC Prod-WH24P Survey Measured Vertical Map Map Depth Inclination Azimuth Depth +N/-S +E/-W Northing Easting (ft) (°) (°) (ft) (ft) (ft) (ft) (ft) Latitude Longitude 10,490.32 86.35 321.91 8,673.89 1,478.99 -3,659.31 5,962,354.51 687,826.74 70°18'7.072 N 148°28'42.72 W TIP 10,501.00 86.40 323.33 8,674.57 1,487.46 -3,665.78 5,962,362.81 687,820.06 70°18'7.155 N 148°28'42.91 W KOP 10,530.26 89.39 318.82 8,675.64 1,510.20 -3,684.15 5,962,385.07 687,801.12 70°18'7.379 N 148°28'43.45 W 10,560.45 91.26 316.44 8,675.47 1,532.50 -3,704.49 5,962,406.85 687,780.21 70°18'7.598 N 148°28'44.04 WI 10,590.52 88.41 312.69 8,675.56 1,553.59 -3,725.91 5,962,427.39 687,758.27 70°18'7.806 N 148°28'44.66 W 10,620.57 86.13 314.66 8,676.99 1,574.32 -3,747.62 5,962,447.55 687,736.04 70°18'8.009 N 148°28'45.30 W 10,650.63 86.07 320.16 8,679.04 1,596.39 -3,767.90 5,962,469.10 687,715.20 70°18'8.226 N 148°28'45.89 WI 10,680.46 83.70 325.47 8,681.70 1,620.05 -3,785.86 5,962,492.29 687,696.65 70°18'8.459 N 148°28'46.41 W 10,710.33 84.16 330.43 8,684.86 1,645.21 -3,801.61 5,962,517.04 687,680.26 70°18'8.706 N 148°28'46.87 W 10,740.41 85.18 334.69 8,687.65 1,671.79 -3,815.41 5,962,543.26 687,665.79 70°18'8.968 N 148°28'47.27 W 10,770.66 88.31 338.78 8,689.37 1,699.53 -3,827.33 5,962,570.68 687,653.16 70° 18'9.240 N 148°28'47.62 W 10,800.65 90.37 339.07 8,689.72 1,727.51 -3,838.12 5,962,598.37 687,641.67 70°18'9.515 N 148°28'47.94 W 10,830.59 91.60 334.67 8,689.20 1,755.03 -3,849.87 5,962,625.59 687,629.22 70° 18'9.786 N 148°28'48.28 W 10,860.53 92.00 330.60 8,688.26 1,781.60 -3,863.62 5,962,651.80 687,614.79 70° 18'10.047 N 148°28'48.68 W' 10,890.47 89.36 330.21 8,687.91 1,807.63 -3,878.41 5,962,677.44 687,599.35 70° 18'10.303 N 148°28'49.11 W1 10,920.51 86.81 335.37 8,688.91 1,834.32 -3,892.13 5,962,703.77 687,584.95 70° 18'10.566 N 148°28'49.51 W 10,950.48 85.52 341.10 8,690.92 1,862.08 -3,903.22 5,962,731.23 687,573.17 70° 18'10.839 N 148°28'49.84 W, 10,980.71 86.50 345.87 8,693.02 1,890.98 -3,911.79 5,962,759.91 687,563.86 70° 18'11.123 N 148°28'50.09 W 11,010.33 84.78 349.98 8,695.27 1,919.85 -3,917.96 5,962,788.61 687,556.95 70° 18'11.407 N 148°28'50.27 W 11,040.47 88.86 354.90 8,696.95 1,949.67 -3,921.92 5,962,818.32 687,552.24 70° 18'11.700 N 148°28'50.38 W 11,070.25 91.69 359.65 8,696.80 1,979.41 -3,923.33 5,962,848.00 687,550.07 70°18'11.992 N 148°28'50.43 W 11,100.35 93.72 5.17 8,695.38 2,009.43 -3,922.07 5,962,878.05 687,550.56 70° 18'12.288 N 148°28'50.39 W 11,130.38 90.34 8.74 8,694.32 2,039.21 -3,918.44 5,962,907.91 687,553.44 70° 18'12.581 N 148°28'50.28 W 11,160.30 91.41 12.72 8,693.86 2,068.60 -3,912.87 5,962,937.43 687,558.25 70° 18'12.870 N 148°28'50.12 W 11,190.30 93.10 8.60 8,692.68 2,098.05 -3,907.32 5,962,967.01 687,563.05 70° 18'13.159 N 148°28'49.96 W 11,220.41 94.05 4.45 8,690.80 2,127.90 -3,903.91 5,962,996.94 687,565.70 70°18'13.453 N 148°28'49.86 W 11,250.39 96.75 0.65 8,687.98 2,157.71 -3,902.58 5,963,026.77 687,566.27 70°18'13.746 N 148°28'49.82 W 11,280.33 96.37 354.74 8,684.56 2,187.42 -3,903.78 5,963,056.44 687,564.32 70°18'14.038 N 148°28'49.86 W 11,310.36 96.79 351.22 8,681.11 2,217.02 -3,907.42 5,963,085.93 687,559.92 70°18'14.329 N 148°28'49.97 W 11,341.44 94.70 351.41 8,678.00 2,247.59 -3,912.09 5,963,116.37 687,554.47 70°18'14.630 N 148°28'50.10 W • 11,372.45 92.21 356.34 8,676.13 2,278.35 -3,915.39 5,963,147.04 687,550.39 70°18'14.933 N 148°28'50.20 W1, 11,401.95 91.56 0.47 8,675.16 2,307.82 -3,916.21 5,963,176.47 687,548.82 70°18'15.222 N 148°28'50.22 W 11,430.37 90.86 4.38 8,674.56 2,336.20 -3,915.01 5,963,204.88 687,549.30 70° 18'15.502 N 148°28'50.19 W 11,460.38 90.12 9.04 8,674.30 2,366.00 -3,911.50 5,963,234.75 687,552.04 70°18'15.795 N 148°28'50.09 W 11,500.44 91.78 4.96 8,673.64 2,405.74 -3,906.62 5,963,274.61 687,555.91 70°18'16.186 N 148°28'49.95 W 11,530.63 91.26 0.56 8,672.84 2,435.88 -3,905.17 5,963,304.77 687,556.59 70° 18'16.482 N 148°28'49.90 W'i. 11,560.19 90.92 356.07 8,672.28 2,465.41 -3,906.04 5,963,334.27 687,554.97 70°18'16.772 N 148°28'49.93 W 11,590.19 91.44 352.62 8,671.66 2,495.26 -3,908.99 5,963,364.02 687,551.26 70° 18'17.066 N 148°28'50.02 W 11,620.57 90.52 349.64 8,671.14 2,525.27 -3,913.68 5,963,393.90 687,545.81 70° 18'17.361 N 148°28'50.15 W 11,650.67 90.86 344.83 8,670.78 2,554.61 -3,920.32 5,963,423.07 687,538.42 70°18'17.650 N 148°28'50.35 W' 11,680.79 89.42 340.94 8,670.70 2,583.39 -3,929.19 5,963,451.61 687,528.82 70° 18'17.933 N 148°28'50.61 W 11,710.11 88.37 336.82 8,671.27 2,610.73 -3,939.75 5,963,478.67 687,517.57 70° 18'18.201 N 148°28'50.91 W' 11,740.53 88.28 332.25 8,672.16 2,638.18 -3,952.82 5,963,505.77 687,503.81 70° 18'18.471 N 148°28'51.30 W' 11,770.60 87.91 326.70 8,673.16 2,664.05 -3,968.08 5,963,531.25 687,487.89 70°18'18.726 N 148°28'51.74 W 11,800.75 88.37 322.17 8,674.14 2,688.56 -3,985.60 5,963,555.30 687,469.75 70°18'18.967 N 148°28'52.25 W 11,830.55 87.21 317.71 8,675.29 2,711.35 -4,004.76 5,963,577.59 687,450.02 70°18'19.191 N 148°28'52.81 W 11,860.40 88.23 317.98 8,676.47 2,733.46 -4,024.77 5,963,599.18 687,429.45 70° 18'19.408 N 148°28'53.40 W 11,890.63 91.35 325.60 8,676.59 2,757.19 -4,043.46 5,963,622.43 687,410.17 70° 18'19.641 N 148°28'53.94 W 11,922.15 89.14 331.34 8,676.45 2,784.04 -4,059.93 5,963,648.85 687,393.02 70° 18'19.905 N 148°28'54.42 W 11,949.85 88.07 334.07 8,677.13 2,808.65 -4,072.63 5,963,673.13 687,379.70 70° 18'20.147 N 148°28'54.79 W 11,979.81 89.66 340.12 8,677.72 2,836.23 -4,084.28 5,963,700.40 687,367.35 70° 18'20.418 N 148°28'55.13 W 12,010.53 89.85 344.75 8,677.85 2,865.51 -4,093.55 5,963,729.43 687,357.33 70° 18'20.706 N 148°28'55.40 W 12,040.58 92.02 351.40 8,677.36 2,894.89 -4,099.75 5,963,758.64 687,350.38 70° 18'20.995 N 148°28'55.58 W 10/26/2012 2:53:51PM Page 3 COMPASS 2003.16 Build 73 EMI BAKER HUGHES Survey Report- Geographic 0 bP ' INTEQ Company: North America-ALASKA-BP Local Co-ordinate Reference: Well 18-27 Project: Prudhoe Bay TVD Reference: 18-27C @ 53.35ft(Nordic 1) Site: PB DS 18 MD Reference: 18-27C @ 53.35ft(Nordic 1) Well: 18-27 North Reference: True Wellbore: 18-27E Survey Calculation Method: Minimum Curvature Design: 18-27E Database: EDM.16-ANC Prod-WH24P ! Survey I Measured Vertical Map Map ! 1 Depth Inclination Azimuth Depth +N/-S +E/-W Northing Easting (ft) (°) (°) (ft) (ft) (ft) (ft) (ft) Latitude Longitude ' 12,070.50 90.31 355.64 8,676.75 2,924.60 -4,103.13 5,963,788.26 687,346.25 70°18'21.287 N 148°28'55.68 W I 12,100.55 89.39 0.97 8,676.83 2,954.63 -4,104.02 5,963,818.25 687,344.60 70°18'21.583 N 148°28'55.71 W 12,130.98 89.75 5.34 8,677.06 2,985.00 -4,102.34 5,963,848.65 687,345.50 70°18'21.881 N 148°28'55.66 W 12,161.83 91.17 2.29 8,676.81 3,015.78 -4,100.29 5,963,879.47 687,346.77 70°18'22.184 N 148°28'55.60 W 12,190.70 91.81 359.40 8,676.06 3,044.63 -4,099.87 5,963,908.32 687,346.46 70°18'22.468 N 148°28'55.59 W 12,220.59 91.50 355.59 8,675.20 3,074.48 -4,101.17 5,963,938.12 687,344.39 70°18'22.761 N 148°28'55.63 W 12,250.72 89.45 351.05 8,674.95 3,104.39 -4,104.67 5,963,967.94 687,340.13 70°18'23.056 N 148°28'55.73 W 12,282.37 89.85 347.35 8,675.14 3,135.47 -4,110.60 5,963,998.86 687,333.41 70°18'23.361 N 148°28'55.90 W 12,310.53 88.56 343.77 8,675.53 3,162.74 -4,117.62 5,964,025.93 687,325.69 70° 18'23.629 N 148°28'56.11 W 12,340.59 90.09 340.11 8,675.88 3,191.31 -4,126.94 5,964,054.25 687,315.65 70° 18'23.910 N 148°28'56.38 W 12,370.77 90.18 336.72 8,675.81 3,219.37 -4,138.04 5,964,082.02 687,303.84 70° 18'24.186 N 148°28'56.71 W'; 12,400.61 90.31 332.95 8,675.69 3,246.37 -4,150.73 5,964,108.69 687,290.47 70° 18'24.452 N 148°28'57.08 W 12,432.41 89.88 329.41 8,675.63 3,274.23 -4,166.06 5,964,136.14 687,274.44 70° 18'24.726 N 148°28'57.52 W 12,460.85 90.28 326.31 8,675.59 3,298.30 -4,181.18 5,964,159.83 687,258.71 70° 18'24.962 N 148°28'57.97 W 12,492.55 90.80 322.95 8,675.29 3,324.15 -4,199.53 5,964,185.20 687,239.71 70° 18'25.216 N 148°28'58.50 W 12,520.59 90.25 319.46 8,675.04 3,346.00 -4,217.09 5,964,206.59 687,221.59 70° 18'25.431 N 148°28'59.01 W 12,550.29 90.55 315.37 8,674.83 3,367.86 -4,237.19 5,964,227.93 687,200.95 70°18'25.646 N 148°28'59.60 W I 12,582.67 89.05 310.49 8,674.94 3,389.91 -4,260.89 5,964,249.36 687,176.70 70°18'25.863 N 148°29'0.29 W 12,610.83 89.26 313.40 8,675.36 3,408.73 -4,281.83 5,964,267.64 687,155.29 70°18'26.048 N 148°29'0.90 WI 12,640.77 89.17 319.35 8,675.77 3,430.39 -4,302.47 5,964,288.77 687,134.10 70°18'26.261 N 148°29'1.50 W 12,670.57 90.12 324.61 8,675.95 3,453.85 -4,320.82 5,964,311.76 687,115.16 70° 18'26.491 N 148°29'2.04 W' 12,700.46 90.28 320.75 8,675.85 3,477.62 -4,338.94 5,964,335.05 687,096.44 70° 18'26.725 N 148°29'2.57 WI 12,731.25 90.92 317.51 8,675.53 3,500.90 -4,359.08 5,964,357.81 687,075.71 70° 18'26.954 N 148°29'3.16 W 12,760.77 90.12 316.53 8,675.26 3,522.49 -4,379.21 5,964,378.89 687,055.05 70°18'27.166 N 148°29'3.74 W 12,790.67 89.42 322.45 8,675.38 3,545.22 -4,398.62 5,964,401.10 687,035.06 70° 18'27.390 N 148°29'4.31 W 12,820.71 89.33 326.91 8,675.71 3,569.72 -4,415.98 5,964,425.16 687,017.08 70° 18'27.630 N 148°29'4.82 W, 12,850.35 89.60 331.18 8,675.98 3,595.13 -4,431.22 5,964,450.17 687,001.20 70° 18'27.880 N 148°29'5.26 W 12,880.95 89.02 335.84 8,676.35 3,622.51 -4,444.87 5,964,477.19 686,986.86 70°18'28.149 N 148°29'5.66 W; 12,910.66 88.80 339.88 8,676.92 3,650.02 -4,456.06 5,964,504.40 686,974.97 70° 18'28.420 N 148°29'5.99 W j 12,940.77 90.00 344.30 8,677.23 3,678.66 -4,465.32 5,964,532.80 686,964.99 70° 18'28.702 N 148°29'6.26 W 12,971.85 91.87 347.83 8,676.73 3,708.81 -4,472.80 5,964,562.75 686,956.74 70° 18'28.998 N 148°29'6.48 W 13,002.46 94.64 345.07 8,674.99 3,738.52 -4,479.96 5,964,592.26 686,948.83 70° 18'29.290 N 148°29'6.69 W 13,031.08 91.96 342.15 8,673.34 3,765.92 -4,488.02 5,964,619.45 686,940.07 70° 18'29.560 N 148°29'6.92 W 13,060.67 90.86 338.33 8,672.61 3,793.76 -4,498.02 5,964,647.02 686,929.37 70° 18'29.833 N 148°29'7.21 W 13,090.91 89.48 333.11 8,672.52 3,821.31 -4,510.45 5,964,674.25 686,916.24 70°18'30.104 N 148°29'7.58 W 13,116.82 91.23 331.13 8,672.36 3,844.21 -4,522.56 5,964,696.83 686,903.55 70°18'30.329 N 148°29'7.93 W 13,142.57 90.83 329.60 8,671.90 3,866.59 -4,535.29 5,964,718.87 686,890.25 70°18'30.549 N 148°29'8.30 W'. 13,187.00 90.83 329.60 8,671.26 3,904.91 -4,557.77 5,964,756.60 686,866.80 70°18'30.926 N 148°29'8.96 W! TD-27/8" j 1 10/26/2012 2:53:51PM Page 4 COMPASS 2003.16 Build 73 2-\\-04-1 2.2-2 Oo rr,IIIII BAKER HUGHES INTEQ North America - ALASKA - BP Prudhoe Bay PB DS 18 18-27 18-27EPB1 Survey: MWD Survey Report - Geographic 26 October, 2012 0 bp • //.il BAKER HUGHES Survey Report-Geographic 0 by INTEQ Company: North America-ALASKA-BP Local Co-ordinate Reference: Well 18-27 Project: Prudhoe Bay TVD Reference: 18-27C @ 53.35ft(Nordic 1) Site: PB DS 18 MD Reference: 18-27C @ 53.35ft(Nordic 1) Well: 18-27 North Reference: True Wellbore: 18-27EPB1 Survey Calculation Method: Minimum Curvature Design: 18-27EPB1 Database: EDM.16-ANC Prod-WH24P Project Prudhoe Bay,GPB,PRUDHOE BAY Map System: US State Plane 1927(Exact solution) System Datum: Mean Sea Level Geo Datum: NAD 1927(NADCON CONUS) Using Well Reference Point Map Zone: Alaska Zone 04 Using geodetic scale factor Site PB DS 18,TR-11-14 Site Position: Northing: 5,959,213.15ft Latitude: 70°17 35.252 N From: Map Easting: 691,583.44ft Longitude: 148°26'55.55 W Position Uncertainty: 0.00 ft Slot Radius: 0.000 in Grid Convergence: 1.46° L _ Well 18-27 API No 500292232100 Well Position +N/-S 0.00 ft Northing: 5,960,969.34 ft Latitude: 70°17'52.535 N +E/-W 0.00 ft Easting: 691,522.34 ft Longitude: 148°26'56.03 W Position Uncertainty 0.00 ft Wellhead Elevation: ft Ground Level: 15.40 ft Wellbore 18-27EPB1 API No 500292232171 Magnetics Model Name Sample Date Declination Dip Angle Field Strength (0) (°) (nT) BGGM2012 9/15/2012 20.91 81.04 57,640 Design 18-27EPB1 Audit Notes: Version: Phase: ACTUAL Tie On Depth: 10,294.09 Vertical Section: Depth From(TVD) +N/-S +E/-W Direction (ft) (ft) (ft) (0) 37.65 0.00 0.00 292.76 Survey Program Date: 10/15/2012 From To (ft) (ft) Survey(Wellbore) Tool Name Description 951.56 9,733.51 18-27 Srvy MWD(18-27) MWD MWD-Standard 9,830.00 10,294.09 18-27A Srvy MWD(18-27A) MWD MWD-Standard 10,300.50 11,025.00 MWD(18-27EPB1) MWD MWD-Standard 10/26/2012 2:44:39PM Page 2 COMPASS 2003.16 Build 73 BAKER HUGHES Survey Report- Geographic 0 bp INTEQ Company: North America-ALASKA-BP Local Co-ordinate Reference: Well 18-27 Project: Prudhoe Bay TVD Reference: 18-27C @ 53.35ft(Nordic 1) Site: PB DS 18 MD Reference: 18-27C @ 53.35ft(Nordic 1) Well: 18-27 North Reference: True Wellbore: 18-27EPB1 Survey Calculation Method: Minimum Curvature Design: 18-27EPB1 Database: EDM .16-ANC Prod-WH24P Survey Measured Vertical Map Map Depth Inclination Azimuth Depth +N/-S +E/-W Northing Easting (ft) (°) (°) (ft) (ft) (ft) (ft) (ft) Latitude Longitude 10,294.09 86.67 296.13 8,659.36 1,356.96 -3,508.45 5,962,236.37 687,980.65 70° 18'5.873 N 148°28'38.32 W TIP 10,300.50 86.67 295.83 8,659.73 1,359.76 -3,514.20 5,962,239.03 687,974.83 70°18'5.900 N 148°28'38.49 W KOP 10,330.24 84.61 300.88 8,662.00 1,373.84 -3,540.29 5,962,252.43 687,948.40 70°18'6.039 N 148°28'39.25 W 10,360.71 84.21 306.08 8,664.97 1,390.56 -3,565.58 5,962,268.50 687,922.69 70°18'6.203 N 148°28'39.99 W 10,390.28 86.83 308.41 8,667.28 1,408.40 -3,589.04 5,962,285.74 687,898.79 70°18'6.378 N 148°28'40.67 W 10,428.40 85.61 313.83 8,669.79 1,433.41 -3,617.68 5,962,310.00 687,869.51 70°18'6.624 N 148°28'41.51 W 10,457.14 86.40 317.03 8,671.79 1,453.83 -3,637.80 5,962,329.91 687,848.88 70°18'6.825 N 148°28'42.09 W 10,490.32 86.35 321.91 8,673.89 1,478.99 -3,659.31 5,962,354.51 687,826.74 70°18'7.072 N 148°28'42.72 W 10,527.35 86.53 326.82 8,676.19 1,509.02 -3,680.84 5,962,383.98 687,804.46 70°18'7.367 N 148°28'43.35 W 10,553.13 86.72 331.69 8,677.71 1,531.13 -3,693.99 5,962,405.74 687,790.75 70°18'7.585 N 148°28'43.73 W', 10,579.64 85.30 334.99 8,679.56 1,554.76 -3,705.85 5,962,429.06 687,778.28 70°18'7.817 N 148°28'44.08 W 10,610.12 84.86 337.36 8,682.17 1,582.54 -3,718.12 5,962,456.52 687,765.31 70°18'8.090 N 148°28'44.44 W 10,641.59 85.18 339.54 8,684.90 1,611.69 -3,729.64 5,962,485.37 687,753.06 70°18'8.377 N 148°28'44.77 W 10,670.29 85.76 341.06 8,687.17 1,638.63 -3,739.28 5,962,512.05 687,742.73 70°18'8.642 N 148°28'45.05 W 10,703.30 86.78 339.25 8,689.32 1,669.61 -3,750.46 5,962,542.74 687,730.77 70°18'8.946 N 148°28'45.38 W 10,734.46 87.79 336.26 8,690.79 1,698.42 -3,762.24 5,962,571.23 687,718.26 70°18'9.230 N 148°28'45.72 W 10,773.34 87.27 333.92 8,692.47 1,733.64 -3,778.60 5,962,606.03 687,701.00 70° 18'9.576 N 148°28'46.20 W 10,800.73 86.66 338.49 8,693.92 1,758.66 -3,789.64 5,962,630.76 687,689.34 70°18'9.822 N 148°28'46.52 W 10,830.36 86.80 341.46 8,695.61 1,786.45 -3,799.76 5,962,658.28 687,678.51 70° 18'10.095 N 148°28'46.82 W 10,860.59 88.01 346.25 8,696.98 1,815.45 -3,808.16 5,962,687.05 687,669.38 70° 18'10.381 N 148°28'47.07 W 10,890.22 87.09 350.64 8,698.25 1,844.45 -3,814.09 5,962,715.88 687,662.71 70° 18'10.666 N 148°28'47.24 W 10,920.33 87.21 354.78 8,699.75 1,874.27 -3,817.90 5,962,745.60 687,658.14 70° 18'10.959 N 148°28'47.35 W 10,951.02 87.73 0.03 8,701.10 1,904.89 -3,819.29 5,962,776.17 687,655.97 70° 18'11.260 N 148°28'47.39 W 10,979.96 87.33 4.45 8,702.35 1,933.77 -3,818.16 5,962,805.07 687,656.36 70° 18'11.544 N 148°28'47.36 W 11,025.00 87.33 4.45 8,704.45 1,978.63 -3,814.67 5,962,850.00 687,658.71 70° 18'11.985 N 148°28'47.26 W TD 10/26/2012 2:44:39PM Page 3 COMPASS 2003.16 Build 73 22�ao BAKER HUGHES INTEQ North America - ALASKA - BP Prudhoe Bay PB DS 18 18-27 18-27EPB2 Survey: 18-27EPB2 Survey Report - Geographic 26 October, 2012 , TIMI BAKER HUGHES Survey Report- Geographic 0 by INTEQ Company: North America-ALASKA-BP Local Co-ordinate Reference: Well 18-27 Project: Prudhoe Bay TVD Reference: 18-27C @ 53.35ft(Nordic 1) Site: PB DS 18 MD Reference: 18-27C @ 53.35ft(Nordic 1) Well: 18-27 North Reference: True Wellbore: 18-27EPB2 Survey Calculation Method: Minimum Curvature Design: 18-27EPB2 Database: EDM.16-ANC Prod-WH24P Project Prudhoe Bay,GPB,PRUDHOE BAY Map System: US State Plane 1927(Exact solution) System Datum: Mean Sea Level Geo Datum: NAD 1927(NADCON CONUS) Using Well Reference Point Map Zone: Alaska Zone 04 Using geodetic scale factor Site PB DS 18,TR-11-14 Site Position: Northing: 5,959,213.15ft Latitude: 70°17'35.252 N From: Map Easting: 691,583.44ft Longitude: 148°26'55.55 W Position Uncertainty: 0.00 ft Slot Radius: 0.000in Grid Convergence: 1.46 ° Well 18-27 API No 500292232100 Well Position +N/-S 0.00 ft Northing: 5,960,969.34 ft Latitude: 70° 17'52.535 N +E/-W 0.00 ft Easting: 691,522.34 ft Longitude: 148°26'56.03 W Position Uncertainty 0.00 ft Wellhead Elevation: ft Ground Level: 15.40ft Wellbore 18-27EPB2 API No 500292232172 Magnetics Model Name Sample Date Declination Dip Angle Field Strength (0) (0) (nT) BGGM2012 9/15/2012 20.91 81.04 57,640 Design 18-27EPB2 Audit Notes: Version: Phase: ACTUAL Tie On Depth: 10,773.34 Vertical Section: Depth From(TVD) +N/-S +E/-W Direction (ft) (ft) (ft) (0) 37.65 0.00 0.00 304.94 Survey Program Date: 10/15/2012 From To (ft) (ft) Survey(Wellbore) Tool Name Description 951.56 9,733.51 18-27 Srvy MWD(18-27) MWD MWD-Standard 9,830.00 10,294.09 18-27A Srvy MWD(18-27A) MWD MWD-Standard 10,300.50 10,773.34 MWD(18-27EPB1) MWD MWD-Standard 10,775.00 11,903.00 18-27EPB2(18-27EPB2) MWD MWD-Standard 10/26/2012 2:48:04PM Page 2 COMPASS 2003.16 Build 73 BAKER • HUGHES Survey Report- Geographic 0 bp INTEQ Company: North America-ALASKA-BP Local Co-ordinate Reference: Well 18-27 Project: Prudhoe Bay TVD Reference: 18-27C @ 53.35ft(Nordic 1) Site: PB DS 18 MD Reference: 18-27C @ 53.35ft(Nordic 1) Well: 18-27 North Reference: True Wellbore: 18-27EPB2 Survey Calculation Method: Minimum Curvature Design: 18-27EPB2 Database: EDM .16-ANC Prod-WH24P Survey Measured Vertical Map Map Depth Inclination Azimuth Depth +N/-S +E/-W Northing Easting (ft) (°) (°) (ft) (ft) (ft) (ft) (ft) Latitude Longitude 10,773.34 87.27 333.92 8,692.47 1,733.64 -3,778.60 5,962,606.03 687,701.00 70° 18'9.576 N 148°28'46.20 W TIP 10,775.00 87.23 334.20 8,692.55 1,735.14 -3,779.33 5,962,607.50 687,700.24 70° 18'9.591 N 148°28'46.22 WI KOP 10,805.27 90.03 329.54 8,693.27 1,761.81 -3,793.59 5,962,633.80 687,685.30 70° 18'9.853 N 148°28'46.64 W 10,835.59 91.69 326.34 8,692.82 1,787.50 -3,809.68 5,962,659.07 687,668.57 70°18'10.106 N 148°28'47.11 W 10,867.29 89.57 332.16 8,692.47 1,814.73 -3,825.88 5,962,685.88 687,651.68 70°18'10.373 N 148°28'47.58 W 10,896.71 91.07 337.09 8,692.31 1,841.30 -3,838.48 5,962,712.12 687,638.40 70° 18'10.635 N 148°28'47.95 W 10,925.65 89.72 341.07 8,692.11 1,868.33 -3,848.81 5,962,738.87 687,627.39 70° 18'10.900 N 148°28'48.25 W 10,965.60 90.43 348.41 8,692.05 1,906.84 -3,859.32 5,962,777.10 687,615.90 70° 18'11.279 N 148°28'48.56 W' 11,000.49 90.77 354.25 8,691.69 1,941.32 -3,864.58 5,962,811.43 687,609.77 70° 18'11.618 N 148°28'48.71 W 11,030.67 91.14 358.67 8,691.18 1,971.43 -3,866.44 5,962,841.48 687,607.14 70° 18'11.914 N 148°28'48.77 W1 11,060.71 91.66 3.94 8,690.45 2,001.44 -3,865.76 5,962,871.50 687,607.06 70° 18'12.209 N 148°28'48.75 W1 11,090.63 90.18 8.51 8,689.97 2,031.17 -3,862.51 5,962,901.30 687,609.54 70° 18'12.502 N 148°28'48.65 W, 11,120.52 90.06 11.97 8,689.91 2,060.58 -3,857.20 5,962,930.83 687,614.10 70° 18'12.791 N 148°28'48.50 W 1 11,150.46 91.78 7.69 8,689.43 2,090.07 -3,852.09 5,962,960.44 687,618.46 70° 18'13.081 N 148°28'48.35 W 11,180.47 90.06 5.14 8,688.94 2,119.88 -3,848.74 5,962,990.33 687,621.05 70° 18'13.374 N 148°28'48.25 W 11,210.60 90.46 1.39 8,688.81 2,149.96 -3,847.02 5,963,020.44 687,622.00 70° 18'13.670 N 148°28'48.20 W 11,241.77 89.60 357.43 8,688.79 2,181.12 -3,847.34 5,963,051.58 687,620.89 70° 18'13.977 N 148°28'48.21 W 11,270.73 89.17 352.94 8,689.10 2,209.97 -3,849.77 5,963,080.35 687,617.72 70° 18'14.260 N 148°28'48.28 W 11,300.79 89.63 349.28 8,689.42 2,239.66 -3,854.42 5,963,109.92 687,612.32 70° 18'14.552 N 148°28'48.42 W 11,330.07 88.19 345.51 8,689.97 2,268.22 -3,860.81 5,963,138.31 687,605.21 70° 18'14.833 N 148°28'48.61 WI 11,360.33 87.91 350.44 8,691.00 2,297.79 -3,867.10 5,963,167.70 687,598.16 70° 18'15.124 N 148°28'48.79 W 11,390.53 88.31 356.26 8,692.00 2,327.76 -3,870.60 5,963,197.57 687,593.90 70° 18'15.419 N 148°28'48.89 W 11,421.68 88.34 358.67 8,692.91 2,358.87 -3,871.98 5,963,228.63 687,591.73 70° 18'15.725 N 148°28'48.93 W I 11,450.43 88.01 355.44 8,693.83 2,387.56 -3,873.45 5,963,257.27 687,589.53 70° 18'16.007 N 148°28'48.98 WI 11,480.09 88.62 352.13 8,694.70 2,417.03 -3,876.66 5,963,286.65 687,585.57 70° 18'16.297 N 148°28'49.07 W 11,510.49 90.71 356.31 8,694.88 2,447.26 -3,879.72 5,963,316.80 687,581.74 70° 18'16.594 N 148°28'49.16 W 11,540.39 93.10 1.15 8,693.88 2,477.13 -3,880.38 5,963,346.63 687,580.32 70° 18'16.888 N 148°28'49.18 W 11,570.33 92.61 0.23 8,692.39 2,507.03 -3,880.02 5,963,376.53 687,579.91 70° 18'17.182 N 148°28'49.17 W' 11,599.89 92.06 355.16 8,691.19 2,536.53 -3,881.21 5,963,405.99 687,577.97 70°18'17.472 N 148°28'49.21 W 11,630.13 94.27 351.62 8,689.52 2,566.52 -3,884.69 5,963,435.88 687,573.74 70°18'17.767 N 148°28'49.31 W 11,660.57 96.86 347.47 8,686.56 2,596.30 -3,890.18 5,963,465.51 687,567.49 70°18'18.060 N 148°28'49.47 W 11,696.39 95.96 340.56 8,682.56 2,630.50 -3,899.98 5,963,499.45 687,556.82 70°18'18.396 N 148°28'49.75 W 11,720.59 95.69 337.06 8,680.10 2,652.94 -3,908.68 5,963,521.66 687,547.55 70°18'18.617 N 148°28'50.01 W 11,750.54 97.53 332.03 8,676.65 2,679.80 -3,921.46 5,963,548.18 687,534.09 70° 18'18.881 N 148°28'50.38 W 11,780.57 100.21 328.12 8,672.02 2,705.51 -3,936.25 5,963,573.50 687,518.65 70° 18'19.134 N 148°28'50.81 W 11,812.03 100.61 322.66 8,666.33 2,730.96 -3,953.82 5,963,598.50 687,500.44 70° 18'19.384 N 148°28'51.33 W 11,843.47 99.55 321.34 8,660.83 2,755.36 -3,972.88 5,963,622.40 687,480.77 70° 18'19.624 N 148°28'51.88 W1 11,903.00 99.50 321.34 8,650.98 2,801.20 -4,009.55 5,963,667.29 687,442.94 70° 18'20.074 N 148°28'52.95 W I TD 10/26/2012 2:48:04PM Page 3 COMPASS 2003.16 Build 73 North America -ALASKA- BP `` - e.1 of Operation Summary Report Common Well Name. 18-27 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:9/24/2012 End Date: X3-01299(2,713,188.76) X3-01299-C:DRILL Project:Prudhoe Bay Site: PB DS 18 Rig Name/No.: NORDIC 1 Spud Date/Time: 10/11/2012 12:00.00AM Rig Release: 10/26/2012 Rig Contractor:NORDIC CALISTA UWI: Active Datum: 18-27E New RKB @53.70ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 10/5/2012 06.00 - 09:30 3.50 MOB P PRE FINISH RIG MOVE CHECKLIST TASKS. HOLD PJSM ON MOVING RIG OFF OF WELL. ASSIGN SPOTTER POSITIONS,DISCUSS IMPORTANCE OF CLEAR,CONCISE COMMUNICATION AND GENERAL RIG MOVE HAZARDS. MOVE RIG OFF OF B-27 AND STAGE ON B-PAD. 09:30 - 12:30 3.00 MOB P PRE REMOVE T-MATS AND CONTAINMENT FROM AROUND B-27. CLOSE OUT WWT FOR B-27 WITH PAD OPERATOR. DRILLER AND TOOLPUSHER MAKE ROUTE DRIVE FROM B-PAD TO DS 18. 12:30 - 13:00 0.50 MOB P PRE HOLD PJSM ON MOVING RIG FROM B-PAD TO DS 18. REVIEW GENERAL RIG MOVE HAZARDS,SPECIFIC KNOWN HAZARD AREAS IDENTIFIED DURING ROUTE DRIVES, COMMUNICATION WITHIN THE RIG AND ALSO WITH SECURITY. ASSIGN PEOPLE TO POSITIONS. 13:00 - 19:00 6.00 MOB _P PRE MOVE RIG FROM B PAD TO LISBURNE ACCESS STAGING AREA. ✓ AOGCC GIVEN 24-HR NOTICE FOR 18-27 BOPE TEST AT 1422-HRS. AOGCC REP, CHUCK SCHEVE,LEFT MESSAGE AT 1427-HRS WAIVING STATE'S RIGHT TO WITNESS THE BOPE TEST. 19:00 - 00:00 5.00 MOB P PRE WAIT AT LISBURNE ACCESS STAGING AREA FOR MATS TO FINISH BEING LAID ON DS 18 ACCESS RD. API VALVE SHOP INSTALL UN-TAPPED BLIND FLANGE ON COMPANION SIDE OF TREE. LO/TO L2-21 WITH PAD OPERATOR FOR AC ISSUE. 10/6/2012 00.00 - 04:30 4.50 MOB P PRE WAIT AT LISBURNE ACCESS STAGING AREA FOR MATS TO FINISH BEING LAID ON DS 18 ACCESS RD. COMPLETE WELL WORK TRANSFER PERMIT WITH DS 18 OPERATOR. 04:30 - 07:15 2.75 MOB P PRE MOVE RIG DOWN LISBURNE ACCESS ROAD TO DS-18 ACCESS ROAD AND ON TO DS 18. 07:15 - 14:15 7.00 MOB P PRE WAIT FOR MATS TO BE LAID ON DS 18 TO WELL 18-27. MOVE RIG DOWN BOARDWALK AND TURN TO SPOT RIG JUST IN FRONT OF WELL. 14:15 - 15:15 1.00 MOB P PRE HOLD PJSM ON SPOTTING RIG OVER WELL. DISCUSS EMERGENCY STOP,ASSIGN PEOPLE TO POSITIONS AND STRESS IMPORTANCE OF CLEAR COMMUNICATION. BACK RIG OVER WELL 18-27 AND SHIM IN PLACE. 15:15 - 16:00 0.75 RIGU P PRE SPOT AUXILIARY EQUIPMENT. RU STAIRS& GERONIMO. 16:00 - 18:00 2.00 RIGU P PRE TAKE ON RIG WATER. CONTINUE SPOTTING AUXILIARY EQUIPMENT.CH2 REMOVING RIG MATS FROM DS 18 ACCESS RD. ACCEPT RIG AT 16:00 HOURS. Printed 11/5/2012 10:34:38AM North America-ALASKA- BP Page 2 of 29 O•eration Summa Report Common Well Name: 18-27 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:9/24/2012 End Date: X3-01299(2,713,188.76) X3-01299-C:DR I LL Project:Prudhoe Bay Site:PB DS 18 Rig Name/No.:NORDIC 1 Spud Date/Time: 10/11/2012 12.00.00AM Rig Release: 10/26/2012 Rig Contractor:NORDIC CALISTA UWI: Active Datum: 18-27E New RKB @53.70ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 18:00 - 23:30 5.50 RIGU P PRE SPOT TIGER TANK,FUEL TRAILER AND SATELLITE CAMP.RIG UP HARD LINE TO TIGER TANK.MOUNT PROTECTIVE COVERS OVER ANNULUS VALVES AND SSV.TEST HARD LINES. 23:30 - 00:00 0.50 BOPSUR P PRE HOLD PJSM.PERFORM DUAL BARRIER LEAK TIGHT TEST ON SWAB,SSV AND MASTER- PASS.RIG UP TO CONTINUOUSLY MONITOR VOID BETWEEN SWAB AND SSV. 10/7/2012 00:00 - 00:30 0.50 BOPSUR P PRE PJSM.NIPPLE DOWN SWAB CAP. 00:30 - 02:00 1.50 BOPSUR P PRE NIPPLE UP BOP AND ASSOCIATED EQUIPMENT. 02:00 - 03:30 1.50 BOPSUR P PRE PJSM. INSPECT TOT ELEMENTS. REPLACE TOP SEAL ON VBRS&BLADE SEAL ON BSRS. ALL OTHER ELEMENTS APPEAR IN GOOD ORDER. 03:30 - 04:00 0.50 BOPSUR P PRE HOLD RIG EVACUATION DRILL.ALL PERSONEL EVACUATED IN THE PROPER DIRECTION IN RELATION TO THE WIND. EVERYONE ACCOUNTED FOR,SECURITY AND DS OPERATOR NOTIFIED. AAR SHOWED PERSONNEL FOLLOWED -PROCEDURE,ACCOUNTING FOR THIRD PARTY PERSONNEL AND SIMULATING TURNING OFF EQUIPMENT AS NECCESSARY AND RESTRICTING ACCESS TO THE PAD. 04:00 - 07:00 3.00 BOPSUR P I PRE FLOOD LINES AND BOP. ATTEMPT BODY TEST. DOOR SEAL &CHECK VALVE HOUSING LEAK. REPLACE DOOR SEAL&CHECK VALVE HOUSING SEAL. 07:00 - 13:00 6.00 BOPSUR P PRE BEGIN INITIAL BOPE TEST. 3 D TEST TO 250-PSI/3500-PSI. HOLD AND CHART EACH TEST FOR 5, FLAT-LINE �5� MINUTES. '` TESTS WITNESSED BY BP WSL&NORDIC TOOLPUSHER. AOGCC REP CHUCK SCHEVE WAIVED STATE'S RIGHT TO WITNESS AT 1427-HRS ON 10/5/2012. PERFORM ACCUMULATOR DRAWDOWN TEST. FUNCTION BOPE FROM ALL STATIONS(RIG FLOOR,OPS CAB,ACCUMULATOR). TEST H2S AND LEL ALARMS-GOOD TEST. 13:00 - 14:30 1.50 RIGU P PRE HOLD PJSM ON FILLING COIL. PU INJECTOR AND MU NOZZLE TO COIL. OAL =4.74'. STAB ON WELL AND FILL COIL WITH FRESH WATER AT 2-BPM. FILL PIT 4 WITH FRESH WATER FOR ALL REMAINING TESTING/ SLACK PUMPING. OBTAIN RKBS. IA/OA-0-PSI/0-PSI. 14:30 - 15:00 0.50 BOPSUR P PRE TEST INNER REEL VALVE&PACKOFF TO 250-PSI/3500-PSI. HOLD AND CHART EACH TEST FOR 5 MIN FLAT LINE. TEST 2(EA)FOSV TO SAME CRITERIA. GOOD TESTS. Printed 11/5/2012 10:34:38AM ; - • North America -ALASKA- BP • Page 3 of 2' O.eration Summa Re.ort Common Well Name: 18-27 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date: 9/24/2012 End Date: X3-01299(2,713,188 76) X3-01299-C DRILL Project:Prudhoe Bay Site:PB DS 18 Rig Name/No.:NORDIC 1 Spud Date/Time:10/11/2012 12:00:00AM Rig Release: 10/26/2012 Rig Contractor:NORDIC CALISTA UWI: Active Datum: 18-27E New RKB @53.70ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 15:00 - 16:45 1.75 BOPSUR P PRE POSITION COIL 1'ABOVE SWAB VALVE. TEST MANUAL LOCKS ON LOWER COMBI RAMS,2-3/8"X 3-1/2“VBRS AND UPPER COMBI RAMS. GOOD TESTS. 16:45 - 17:30 0.75 MOB P PRE WITH INJECTOR STABBED ON,REVERSE E-LINE SLACK INTO COIL. NOTICE EVIDENCE THAT PRESSURE BULKHEAD MAY BE LEAKING. TIGHTEN AND THEN RESUME REVERSE CIRCULATING. NO MORE LEAKS SEEN. SURGE PUMPS UP TO 4-BPM AND HEAR WIRE MOVING. 17:30 - 19:00 1.50 BOPSUR P PRE UNSTAB INJECTOR&TEST BSR MANUAL LOCKS. TEST TO 250/3500-PSI. HOLD AND CHART EACH TEST FOR 5-MINUTES. GOOD TESTS. 19:00 - 20:00 1.00 BOPSUR P PRE PJSM FOR CUTTING COIL.MOUNT COIL CUTTER AND ESTABLISH LENGTH OF CUTS. CUT 290'OF COIL WITH NO CABLE EXPOSED. 20:00 - 20:30 0.50 BOPSUR P PRE MAKE UP COIL CONNECTOR AND PULL TEST TO 30K-PASS. 20:30 - 21:00 0.50 BOPSUR N SFAL PRE ATTEMPT TO PRESSURE TEST THE COIL CONNECTOR AND THE INNER PRESSURE BULKHEAD. BULKHEAD PACKOFF LEAKING. UNABLE TO STOP LEAK.DECISION TO CHANGE OUT BULKHEAD AND PACKOFF. 21:00 - 00:00 3.00 BOPSUR N 'SFAL PRE CHANGE OUT INNER PRESSURE BULKHEAD AND PACKOFF.ATTEMPT TO PRESSURE TEST INNER PRESSURE BULKHEAD-FAIL. CONSULT WITH CTS AND DECISION MADE TO TRY SMALLER PACKOFF FOR PRESSURE BULKHEAD. 10/8/2012 00:00 - 03:15 3.25 BOPSUR N SFAL PRE CHANGE OUT PACKOFFS ON INNER PRESSURE BULKHEAD.WAIT ONE HOUR FOR PACKOFFS TO SET UP.TEST COIL CONNECTOR AND INNER PRESSURE BULKHEAD TO 250 PSI LOW,3800 PSI HIGH- PASS 03:15 - 04:00 0.75 BOPSUR P PRE PUMP E-LINE FORWARD FOR HEADING UP TO BHI. 04:00 - 05:15 1.25 BOPSUR P PRE HEAD UP BHI AND TEST. 05:15 - 07:00 1.75 BOPSUR P PRE STAB INJECTOR AND TEST BHI CHECKS, LUBRICATOR AND QTS CONNECTION. DISPLACE COIL REEL WITH 1%KCL AT 3-BPM 07:00 - 08:45 1.75 BOPSUR P PRE HOLD PJSM ON PULLING TWC WITH DSM LUBRICATOR. REVIEW PRESSURE TESTING CRITERIA SAFE EQUIPMENT HANDLING AWARENESS OF WELLBORE PRESSURE PU& RU LUBRICATOR PRESSURE TEST TO 250-PSI/3500-PSI FOR 5-MIN PER TEST GOOD TESTS Printed 11/5/2012 10:34:38AM `North America ALASKA BP Page c - - ~9. Operation Summary Report ., Common Well Name: 18-27 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date: 9/24/2012 End Date: X3-01299(2,713,188.76) X3-01299-C:DRILL Project: Prudhoe Bay Site: PB DS 18 • Rig Name/No.. NORDIC 1 Spud Date/Time: 10/11/2012 12.00:00AM Rig Release: 10/26/2012 Rig Contractor:NORDIC CALISTA UWI: Active Datum: 18-27E New RKB @53.70ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) 1 (ft) 08:45 - 10:00 1.25 BOPSUR P PRE ENGAGE TWC AND EQUALIZE-2600-PSI WELLBORE PRESSURE. PULL TWC. CLOSE MASTER VALVE, BLEED OFF PRESSURE TO TIGER TANK AND LEAK TIGHT TEST FOR 5-MINUTES. NO PRESSURE BUILD UP. CLOSE SSV AND LEAK TIGHT TEST FOR 5-MINUTES. NO PRESSURE BUILD UP. CLOSE SWAB VALVE. UNSTAB DSM LUBRICATOR&RD. LD LUBRICATOR AND TWC. 10:00 - 10:30 0.50 BOPSUR P PRE MU NIGHT CAP&PRESSURE TEST TO 250-PSI/3500-PSI. HOLD AND CHART EACH TEST FOR 5-MINUTES. 10:30 - 12:00 1.50 BOPSUR P PRE HOLD PJSM ON BULLHEAD KILLING WELL. DISCUSS IMPORTANCE OF GOOD COMMUNICATION, PROPER VALVE ALIGNMENT AND PUMPING SCHEDULE AND FLUID MANAGEMENT IN THE EVENT OF EXCESSIVE LOSSES. PUMP 5-BBLS MEOH SPEAR AT 1-BPM/ WHPSI=2500-PSI WHEN DONE. LINE UP AND BULLHEAD 250-BBLS 8.4-PPG 1%KCL AT 5-BPM. INITIAL BULLHEAD PRESSURE AT 5-BPM=2430-PSI. PRESSURE STEADILY DROPPING UNTIL 160-BBLS AWAY (FLUID NEARING PERFS). CONTINUE TO BULLHEAD AT 5-BPM,SEEING STEADY INJECTION AT 5-BPM/1750-PSI WITH 225-BBLS AWAY. BULLHEAD PRESSURE WITH 250-BBLS AWAY=1890-PSI. IA/OA AT END=260-PSI/0-PSI. 12:00 - 14:00 2.00 BOPSUR P PRE MONITOR WELL. WELLBORE PRESSURE DROPS TO 0-PSI. OBTAIN STATIC LOSS RATE OF 18-BPH. EMPTY PIT#1 OF MUD AND FILL WITH 8.4-PPG KCL. MONITOR WELL-LOSS RATE=6-BPH. FLOW CHECK, REMOVE NIGHT CAP AND OBSERVE FLUID LEVEL SLOWLY FALLING. BRING WHIPSTOCK TO RIG FLOOR WHILE MONITORING WELL. BTT REP MU WHIPSTOCK TO BE RIH. IA/OA= 180-PSI/70-PSI AT START,0-PSI/ 40-PSI AT END. 14:00 - 14:30 0.50 WHIP P WEXIT HOLD PJSM ON PU&RUN WHIPSTOCK. DISCUSS PO—SITIONS OF PEOPLE, WHIPSTOCK HANDLING,AND WELL CONTROL CONSIDERATIONS. MU WHIPSTOCK RUNNING BHA. BHA CONSISTS OF WHIPSTOCK.J-HYD SETTING TOOL,XO, HOT, DGS, DPS, EDC, P&C,WEAR SUB, LOC, UQC,XO, CTC. OAL=79.26'. 14:30 - 15:00 0.50 WHIP P WEXIT STAB ON INJECTOR. TEST QTS TO 250-PSI/3500-PSI. HOLD EACH TEST FOR 5-MINUTES. OPEN EDC&ESTABLISH CIRCULATION AT .32-BPM/60-PSI. OUT RATE= .17-BPM. LOSS RATE=8-10 BPH. Printed 11/5/2012 10:34.38AM North America-ALASKA- BP Page 5 of 29' ,, ✓ � f �� Operation Summary Report ! �� Common Well Name: 18-27 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date: 9/24/2012 End Date: X3-01299(2,713,188.76) X3-01299-C:DRI LL Project: Prudhoe Bay Site: PB DS 18 Rig Name/No.: NORDIC 1 Spud Date/Time: 10/11/2012 12:00:00AM Rig Release: 10/26/2012 Rig Contractor:NORDIC CALISTA UWI: Active Datum: 18-27E New RKB @53.70ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 15:00 - 15:45 0.75 WHIP P WEXIT ft IH WITH WHIPSTOCK. CONTINUE TO CIRCULATE AT.3-BPM. AT START, IA/OA/PVT=0-PSI/10-PSI/ 109-BBLS. 15:45 - 17:30 1.75 WHIP N DPRB 2,540.00 WEXIT INCREASE IN OUT RATE WHILE RIH. SHUT DOWN AND FLOW CHECK-WELL FLOWING. ✓` SHUT IN WELL. NOTIFY CTD FIELD SUPT AND ODE. MONITOR PRESSURES AND DEVELOP PLAN FORWARD TO STRIP IN&SET WHIPSTOCK, THEN KILL WELL WITH MUD. ISICP=200-PSI. FSICP PRIOR TO STRIPPING IN WELL=377-PSI. 17:30 - 18:15 0.75 WHIP P WEXIT STRIP IN WELL WITH WHIPSTOCK FROM 2540'TO 6100' MONITOR SICP CONTINUOUSLY VIA CTDS SCREEN. ISICP=381-PSI. FSICP=546-PSI. 18:15 - 00:00 5.75 WHIP { N DPRB 6,100.00 WEXIT WAIT UNTIL RECIEVE APPROVED OCN FROM ODE.EMPTY PIT#1 AND#4 OF 8.4-PPG 1% KCL&FILL WITH 8.6-PPG POWERPRO MUD. MONITOR WELL PRESSURES.SICP FROM 634 PSI TO 1315 PSI.MOVE COIL DOWN 100'FOR FREEZE PROTECT MANAGEMENT. 10/9/2012 00:00 - 02:00 2.00 BOPSUR P WEXIT OPERATION CHANGE NOTE SUBMITTED AND APPROVED TO PROCEED WITH PACKER WHIPSTOCK TO SETTING DEPTH.QF 10.300' MD.RIH AT 80 FPM WITH A STARTING PRESSURE OF 1700 PSI SICP.DOWN WEIGHT 10.5K. RIH TO 9100'AND LOG TIE-IN WITH A"0"CORRECTION.RIH TO 10,400'MD WITH 1900 PSI SICP.LOG FROM 10,100 TO 10,400 FOR COLLAR LOCATOR. 02:00 - 03:00 1.00 WHIP P WEXIT PULL UP TO 10,300'MD,UP WEIGHT 44K, DOWN WEIGHT 13K.SICP AT 1900 PSI. RUN DOWN TO 10,316'MD TO PUT WHIPSTOCK IN COMPRESSION FOR SETTING.TOP OF WHIPSTOCK PLACED AT 10,300'MD. ORIENTATION AT 92 DEGREES RIGHT OF HIGH SIDE.CLOSE EDC BRING PUMPS ON AT 0.4 BPM. PUMP A TOTAL OF 2.8 BBLS FLUID AND PRESSURE UP TO 1700 PSI COIL PRESSURE AND 1485 PSI DIFFERENTIAL PRESSURE AND OBSERVE SHEAR OF PACKER WHIPSTOCK,ENERGIZING PACKER SLIPS.SET DOWN 7K ONTO PACKER TO CONFIRM SET.PICK UP TO SHEAR OFF OF PACKER WHIPSTOCK AT 13-15K OVER NO OBSERVABLE RELEASE AT 57K.STOP AND DISCUSS OPTIONS.DECIDE TO BRING PUMPS BACK ON LINE TO CHECK SHEAR. BRING PUMPS ON AT 0.4 BPM AND PUMP 2.8 BBLS WITH PRESSURE AT 800 PSI VERIFYING SHEAR.ATTEMPT TO PULL UP AND SHEAR OFF OF PACKER. PULL TO 70K AND APPEARS TO BE DRAGGING UP HOLE. STOP AT BIT DEPTH OF 10,300'MD WHICH PUTS TOP OF WHIPSTOCK AT 10,284'MD. STILL 9'BELOW NEXT UPPER COLLAR. SLACK OFF TO 58K SHUT DOWN Printed 11/5/2012 10:34:38AM North America-ALASKA-BP 410 Page 6 of Operation Summary Report" Common Well Name: 18-27 AFE No Event Type. RE-ENTER-ONSHORE(RON) Start Date: 9/24/2012 End Date. X3-01299(2,713,188 76) X3-01299-C:DRILL Project:Prudhoe Bay Site: PB DS 18 Rig Name/No.:NORDIC 1 Spud Date/Time: 10/11/2012 12:00.00AM Rig Release: 10/26/2012 Rig Contractor:NORDIC CALISTA UWI: Active Datum: 18-27E New RKB©53.70ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 03:00 - 16:40 13.67 WHIP N DPRB 10,284.00 WEXIT WAIT ON APPROVAL OF PLAN TO CIRCULATE OUT GAS.SICP AT 1875 PSI. PUMP 1-BBL OF MUD INTO COIL EVERY HOUR AT.3-BPM/100-PSI. 1115-HRS: NOTIFY AOGCC OF WELL SHUT IN VIA PAGER. AOGCC REP CHUCK SCHEVE RETURNED CALL AND WAS MADE AWARE OF CURRENT SITUATION. CTD SUPT SUBMITTED BOPE USAGE FORM TO AOGCC. 16:40 - 16:55 0.25 WHIP N DPRB 10,284.00 WEXIT APPROVED OCN HAS BEEN SENT,HOLD PJSM WITH CREWS TO BH KILL WELL PUMP DOWN COIL TO LOAD WITH MUD WHP= 1810 PSI 16:55 - 17:30 0.58 WHIP N DPRB 10,284.00 WEXIT MOVE IN KCL TRUCK WHILE DISPLACING COIL TO MUD 17:30 - 17:42 0.20 WHIP N DPRB 10,284.00 WEXIT COIL DISPLACED AND UP THE BACKSIDE TO THE PERFS WITH MUD, LINE UP BOTH PUMPS DOWN THE BACKSIDE TO BH KILL WELL STARTING WHP=1900 PSI PVT=234 BBLS 17:42 - 18:00 0.30 WHIP _ N DPRB 10,284.00 WEXIT START BH KILL DOWN THE BACKSIDE 5 BBLS INTO THE KILL WE ARE AT MAX WHP AT 3000 PSI. SHUT DOWN PUMPS AND MONITOPR PRESSURE PRESSURE IS VERY SLOW TO BLEED OFF CALL ODE 18:00 - 19:00 1.00 WHIP N DPRB 10,284.00 WEXIT WHP HAS BLED DOWN 120 PSI IN 20 MIN,WO ORDERS FROM TOWN. 19:00 - 19:30 0.50 WHIP N DPRB 10,284.00 WEXIT TOP UP PITS AND MOVE TRUCKS TO SAFE AREA. NOTIFY PAD-OPERATOR&BP RADIO BEFORE COMMENCING GAS VENTING OPS. 19:30 - 20:00 0.50 WHIP N DPRB 10,284.00 WEXIT HOLD PJSM FOR GAS VENTING OPS. STRAP TIGERTANK(15BBLS). 20:00 - 22:00 2.00 WHIP N DPRB 10,300.00 WEXIT BLEED OFF PRESSURE FROM BACKSIDE: INITIALLY SEE 2,676PSI SIWHP/1,220PSI SICTP. BLEED OFF—250PSI AND SEE 2,390PSI SIWHP/1,205PSI SICTP.SHUT-IN COIL TUBING PRESSURE IS DECREASING ONLY SLIGHTY. CONTINUE BLEEDING DOWN TO 1,859PSI SIWHP/1,113PSI SICTP. RE-STRAP TIGER TANK AND CONFIRM THAT NO LIQUIDS WERE RECEIVED THROUGHOUT BLEEDING. 22:00 - 23:00 1.00 WHIP N DPRB 10,300.00 WEXIT DISCUSS WAY FORWARD WITH TOWN. DECIDE TO CIRCULATE OUT GAS WITH 125BBLS MUD(ANNULUS VOLUME 100BBLS), TAKING RETUNS INTO TIGER TANK. 23:00 - 00:00 1.00 WHIP N DPRB 10,300.00 WEXIT ATTEMPT CIRCULATING OUT GAS APPLYING _ ✓ DRILLER METHOD: INITIAL CIRC PRESSURE:864PSI/1,652PS1 SIWHP. PUMP IN TOTAL 7.4BBLS AND SEE 3,000PSI CIRC PRESSURE/1,685PS1 SIWHP. UNABLE TO CIRCULATE DOWN COIL.STOP OPERATIONS SUSPECTING BLOCKAGE IN COIL-TUBING ANNULUS. Printed 11/5/2012 10.34:38AM North America -ALASKA- BPS ` .Page 7 Operation Summa Re•ort Common Well Name: 18-27 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date: 9/24/2012 End Date: X3-01299(2,713,188.76) X3-01299-C:DRILL Project:Prudhoe Bay Site:PB DS 18 Rig Name/No.: NORDIC 1 Spud Date/Time: 10/11/2012 12:00:00AM Rig Release: 10/26/2012 Rig Contractor:NORDIC CALISTA UWI: Active Datum: 18-27E New RKB @53.70ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 10/10/2012 00:00 - 00:15 0.25 WHIP N DPRB 10,284.00 WEXIT ATTEMPT TO REVERSE CIRCULATE;APPLY 200PSI ON BACKSIDE THUS INCREASING PRESSURE FROM 1,650PS1 TO 1,850PSI. CANNOT OBSERVE ANY CHANGE IN PRESSURE AT BHA ON DPS(ANNULAR PRESSURE REMAINS AT 5,380PS1, BORE PRESSURE REMAINS AT 5,370PSI). -INDICATION FOR COIL BEING PACKED OFF ABOVE BHA. 00:15 - 01:00 0.75 WHIP N DPRB 10,284.00 WEXIT _ABOVE WAY FORWARD WITH CTD SUPERINTENDENT AND CREWS. DISCUSS POSSIBILITY OF BEING TRAPPED BY SHALLOW HYDRATE PLUG. 01:00 - 01:50 0.83 WHIP N DPRB 10,284.00 WEXIT MOLD PJSM,WAIT FOR SLB SERVICE QUALITY COACH TO COME OUT TO RIG AND PREPARE FOR FREE-POINT CALCULATIONS. 01:50 - 02:00 0.17 WHIP N DPRB 10,284.00 WEXIT ;SLACK OFF CT WEIGHT TO-1.5K LBS,THEN PICK UP WEIGHT TO 44K LBS.SEE 0.6FT STRETCH AND CALCULATE FREE POINT TO BE AT 626'. INCREASE PUW WHEN COIL APPEARS TO GET FREE AGAIN. IMMEDIATELY ATTEMPT FORWARD CIRCULATION,HOWEVER ,UNABLE TO ESTABLISH CIRCULATION. SEE CIRC PRESSURE=3,100PSI/SIWHP= 1,620 PSI. 02:00 - 03:00 1.00 , WHIP N DPRB 10,284.00 WEXIT MANAGE TO ESTABLISH INJECTION OF —0.25BPM AT 3.100PSI CIRC PRESSURE INTO UPPER PERFS? TRY TO INCREASE INJECTIVITY BUT HAVE TO LIMIT SURFACE PRESSURE TO AVOID DAMAGING WHIPSTOCK PACKER(RESTRICT DOWNHOLE-ANNULAR PRESSURE TO —6,300PSI TO KEEP DIFFERENTIAL PRESSURE ACROSS PACKER<3 200PSI) RE-DO RFEE POINT CALCULATION AND CONFIRM FREE POINT AT 650'. 03:00 - 04:00 1.00 WHIP N DPRB 10,284.00 WEXIT CALL TOWN ODE AND DECIDE TO ATTEMPT WARMING UP COIL AND MELTING HYDRATE PLUG BY PUMPING DOWM COIL INTO UPPER FORMATION. CALL OUT FOR LRS PUMP TRUCK TO BE ABLE TO FOR HEAT UP MUD TO 160DEG F- LRS IS TRYING TO FIND TRUCK. 04:00 - 05:00 1.00 WHIP N DPRB 10,284.00 WEXIT LRS CALLS BACK.PUMP TRUCK WILL BE ONLY AVAILABLE AROUND SHIFT-CHANGE. 05:00 - 05:15 0.25 WHIP N DPRB 10,284.00 WEXIT PUMPRATE HAS INCREASED TO-0.55BPM AT 3,080PSI CIRC PRESSURE AND 1,685PSI SHUT-IN PRESSURE. 05:15 - 06:00 0.75 WHIP N DPRB 10,284.00 WEXIT PICK UP TO 76K LBS ON COIL WEIGHT INDICATOR-WEIGHT IS VERY SLOWLY DROPPING OFF TO 74K LBS INDICATING SOME MINOR MOVEMENT.SLACK OFF COIL BACK TO 37.5K LBS AND CONTINUE PUMPING. PUMPRATE AT—0 55BPM AT 3,062PSI CIRC PRESSURE AND 1,699PSI SHUT-IN PRESSURE. 06:00 - 06:30 0.50 WHIP N DPRB 10,284.00 WEXIT PUMPRATE AT-0.75 BPM AT 2,966PS1 CIRC PRESSURE AND 1,729PS1 SHUT-IN PRESSURE. Printed 11/5/2012 10:34:38AM North America-ALASKA- BP Page 8 of 29 Operation Summary Report Common Well Name: 18-27 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:9/24/2012 End Date: X3-01299(2,713,188.76) X3-01299-C:DRI LL Project:Prudhoe Bay Site:PB DS 18 Rig Name/No.: NORDIC 1 Spud Date/Time: 10/11/2012 12:00:00AM Rig Release: 10/26/2012 Rig Contractor:NORDIC CALISTA UWI: Active Datum: 18-27E New RKB @53.70ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 06:30 - 09:00 2.50 WHIP N DPRB 10,284.00 WEXIT WO LRS TO HEAT UP DRILLING MUD TO PUMP HOT MUD DOWNHOLE TO THAW ICE PLUG AND ESTABLISH CIRCULATION STARTING MUD TEMP AT 60° 09:00 - 10:30 1.50 WHIP N DPRB 10,284.00 WEXIT MUD TEMP AT 100° 10:30 - 11:00 0.50 WHIP N DPRB 10,284.00 WEXIT MUD IS AT 150°,HOLD PJSM TO CONTINUE MOVING FOWARD WITH OCN#3 WHP=2000 PSI 11:00 - 11:10 0.17 WHIP N DPRB 10,284.09 WEXIT LRS HAS MUD TO 160°,RIG DOWN VAC TRUCK AND MOVE TO THE RIG TO PUMP HOT MUD DOWN HOLE 11:10 - 11:35 0.42 WHIP N DPRB 10,284.00 WEXIT START PUMPING NEAT METH DOWN TUBING X CT ANNULAS STARTING WHP=2161 PSI CTP=2700 PSI MWD ANN/BORE PSI=5741/5782 3-4 BBLS METH PUMPED AND WHP HAS CLIMBED TO 2400 PSI { 5.5 BBLS METH PUMPED WHP=3000 PSI SHUT DOWN TEST PUMP CTP=2700 PSI MWD ANN/BORE PSI= 5745/5789 PSI 11:35 - 12:10 0.58 WHIP N DPRB 10,284.00 WEXIT START 160°MUD DOWN HOLE STARTING PRESSURES W H/CT=3051/2706 PSI MWD ANN/BORE=5742/5785 PSI INCREASE RATE TO 1 BPM CT PSI=2980 PSI 12:10 - 12:20 0.17 WHIP N DPRB 10,284.00 " WEXIT 160°MUD DOWN HOLE to 1700' PRESSURES -� WH/CT=3563/2955 PSI MWD ANN/BORE=5814/5875 PSI 12:20 - 12:30 0.17 WHIP N DPRB 10,284.00 WEXIT 50 BBLS AWAY AND WHP IS STARTING TO DROP FROM 3590 PSI 12:30 - 12:50 0.33 WHIP N DPRB 10,284.00 WEXIT 60 BBLS AWAY INCREASE RATE TO 1.5 BPM AT 3200 CT PSI WHP=3400 PSI COME ONLINE WITH TEST PUMP WITH NEAT METH WH/CT=3423/3193 PSI MWD ANN/BORE=5842/5933 PSI 12:50 - 13:05 0.25 WHIP N DPRB 10,284.00 WEXIT EVERYTHING LOOKS STABILIZED PUMPING DOWN THE CT AND BACKSIDE,PU TO SEE IF WE ARE FREE PICKED UP 1'AND WT LEVELED OFF AT 27K, PU ANOTHER 1.5'CLEAN PU 20'CLEAN,CONTINUE POOH AT 1 FPM STAYING BELOW 8750'(BOTTOM PUT RIVER PERF) 13:05 - 13:50 0.75 WHIP N DPRB 10,284.00 WEXIT LINE UP TO TAKE RETURN OUT TO THE TIGER TANK MAINTAINING<150 PSI DOWNSTREAM OF THE CHOKE STARTING WHP=3300 PSI IA&OA=427 PSI &270 PSI REDUCE PUMP RATE TO 0.5 BPM BHP=5700 PSI 13:50 - 15:00 1.17 WHIP N DPRB 10,284.00 WEXIT WHP=2765 PSI BHP=5460 PSI IAP=648 PSI OAP=461 PSI 15:00 - 15:40 0.67 WHIP N DPRB 10,284.00 WEXIT GETTING SOME FLUID BUT MOSTLY GAS, CONTINUE TAKING RETURNS TO TT UNTIL RETURNS CLEAN UP 15:25 RETURNS HAVE CLEANED UP A LITTLE BUT DENSITY IS SHOWING METH OR DIESEL Printed 11/5/2012 10:34:38AM North America-ALASKA- BP Page 9 of 29 O•eration Summa Re•^oQ Common Well Name: 18-27 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:9/24/2012 End Date: X3-01299(2,713,188 76) X3-01299-C:DRI LL Project:Prudhoe Bay Site: PB DS 18 Rig Name/No.: NORDIC 1 Spud Date/Time: 10/11/2012 12:00:00AM Rig Release: 10/26/2012 Rig Contractor: NORDIC CALISTA UWI: Active Datum: 18-27E New RKB @53.70ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 15:40 - 15:45 0.08 WHIP N DPRB 10,284.00 WEXIT RETURNS ARE CONSISTENT,CHECK RETURNS FOR MUD. RETURNS LOOK LIKE THINNED OUT MUD, LINE UP TO MGS AND BRING RETURNS INSIDE SENT 10 BBLS TO CUTTINGS BOX AND WE ARE KEEPING THE RETURNS 15:45 - 16:05 0.33 WHIP N DPRB 10,284.00 WEXIT -GOOD MUD AT THE SHAKER,ZERO OUT MM, INCREASE RATE TO 2.5 BPM AND CIRC 125 BBLS HOLDING-100 PSI CHOKE 16:05 - 16:50 0.75 WHIP N DPRB 10,284.00 WEXIT POOH TO 8900'WHILE CIRC BOTTOMS UP +25 BBLS AS PER THE OCN 16:50 - 17:05 0.25 WHIP P WEXIT BOTTOMS UP WAS CLEAN AT 100 BBLS 125 BBLS AWAY,LINE UP TO NORMAL FLOW PATH TO FLOW CHECK WELL 17:05 - 19:10 2.08 WHIP P WEXIT GOOD NO FLOW CHECK,COME ONLINE TO CHECK LOSS RATE.ZERO LOSSES. LINE UP TO MGS AND POOH FOR WINDOW BHA 19:10 - 19:45 0.58 WHIP P WEXIT' FLOWCHECK WELL.ACHIEVE GOOD NO FLOW. 19:45 - 20:30 0.75 WHIP P WEXIT LD BHA#1.BTT HYDRAULIC SETTING TOOL IS LOOKING OKAY, NO MARKS OR ANY REASON FOR CONCERN. 20:30 - 20:45 0.25 STWHIP P WEXIT STAB ON INJECTOR AND CIRCULATE TO FILL UP HOLE-HOLE FULL. 20:45 - 21:45 1.00 STWHIP P WEXIT LINE UP TEST-PUMP,CLOSE SWAB VALVE AND CONDUCT PRESSURE-TEST ON HCR/ PACK-OFF'S AND DFCV'S TO 3,500PSI/ 5MINS.ACHIEVE GOOD TEST. 21:45 - 22:20 0.58 STWHIP P WEXIT OPEN SWAB VALVE AND VERIFY THAT HOLE IS STILL FULL.POP OFF INJECTOR. MU BHA#2 WITH 3.80"DIAMOND WINDOW MILL.DRIFT WINDOW MILL WITH GAUGE-RING(3.80"GO/3.79"NO-GO)AND VERIFY STRING MILL'S OD(3.79"GO/3.78" NO-GO). 22:20 - 23:00 0.67 STWHIP P WEXIT STAB ON INJECTOR AND PRESSURE-TEST QTS TO 300PSI/5MINS AND 4,000PSI/5MINS. 23:00 - 00:00 1.00 STWHIP P WEXIT RIH WITH BHA#2.PVT=305BBLS. 10/11/2012 00:00 - 00:40 0.67 STWHIP P WEXIT CONTINUE RIH TO 9,050'(DO NOT OBSERVE ANY LOSSES WHILE RIH). 00:40 - 01:05 0.42 STWHIP P WEXIT LOG FOR TIE-IN AND APPLY-0.5FT DEPTH-CORRECTION. 01:05 - 01:30 0.42 STWHIP P WEXIT TAKE SCR'S BEFORE COMMENCING MILLING OPS: PUMP#1 PUMP#2 2.6 BPM-2,531 PSI-72 SPM2.6 BPM-2885 PSI-71 SPM 1.0 BPM-2,522 PSI-45 SPM1.0 BPM-1,527 PSI-44 SPM 0.5 BPM- 1,300 PSI-23 SPM0.5 BPM-1,326 PSI-20 SPM 01:30 - 01:50 0.33 STWHIP P WEXIT "DRY-TAG"TOP OF WHIPTSTOCK a 10.302'. PU 10FT, BRING PUMPRATE TO 2.6BPM AND RE-TAG TOP OF WHIPSTOCK AT 10,301.60' Printed 11/5/2012 10:34.38AM W/W • �� -T- � ' • North America-ALASKA- BP P f. Operation Summary Report Common Well Name 18-27 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:9/24/2012 End Date X3-01299(2,713,188.76) X3-01299-C:DRILL Project:Prudhoe Bay Site: PB DS 18 Rig Name/No.: NORDIC 1 Spud Date/Time. 10/11/2012 12:00:OOAM Rig Release: 10/26/2012 Rig Contractor:NORDIC CALISTA UWI: Active Datum: 18-27E New RKB©53.70ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 01:50 - 04:45 2.92 STWHIP P WEXIT COMMENCE WINDOW MILLING OPERATION BY TIME-MILLING AT 1 FT/HR.NOTICE STEADILY INCREASE WOB AS MILL IS GETTING ENGAGED. NO STALLS OCCUR. 10,301.60'-2,531 PSI CIRC PRESSURE (FREESPIN=2,500PSI)/PVT=337BBLS/IA= 552PS1/OA= 165PSI 10,302.00'-2,552PS1 CIRC PRESSURE,0.70K LBS WOB 10,303.00'-2,629'PSI CIRC PRESSURE,2.08K LBS WOB 04:45 - 05:30 0.75 STWHIP P WEXIT 10,303.80'-2,480'PSI CIRC PRESSURE,2.19K LBS WOB NOTICE SUDDEN OCCURRENCE OF LOSSES OF NEARLY 50%FOR A BRIEF PERIOD. LOSSES QUICKLY HEAL UP TO-10% �0.25BPM)_ 05:30 - 06:00 0.50 STWHIP r " P WEXIT 10,303 80'-2,593'PSI CIRC PRESSURE,2.71K LBS WOB,PVT=325BBLS,IA=833PSI/OA= 515PS1 MILL AHEAD WITH<10BBLS/HR LOSSES. 06:00 - 06:30 0.50 STWHIP P WEXIT CONTINUE TIME MILLING WINDOW 06:30 - 07:30 1.00 STWHIP P WEXIT -MILLING WINDOW FREE SPIN=2460 PSI DIFF PSI=180 PSI WOB=2.84 K PVT=318 BBLS 07:30 - 08:00 0.50 STWHIP P WEXIT MILLING WINDOW FREE SPIN=2460 PSI DIFF PSI=80 PSI WOB=2.16 K PVT=315 BBLS LOSSES-3 BPH 08:00 - 08:15 0.25 STWHIP P WEXIT MILLING WINDOW FREE SPIN=2460 PSI DIFF PSI=135 PSI WOB=2.41 K PVT=314 BBLS LOSSES-2 BPH GETTING GOOD METAL ON MAGNETS / 08:15 - 09:15 1.00 STWHIP P WEXIT MILLING WINDOW FREE SPIN=2460 PSI ✓ DIFF PSI=60 PSI WOB=2.85 K PVT=314 BBLS LOSSES-2 BPH 09:15 - 10:05 0.83 STWHIP P WEXIT MILLING WINDOW FREE SPIN=2460 PSI DIFF PSI=50 PSI WOB=1.23 K PVT=311 BBLS LOSSES-2-3 BPH GETTING A LITTLE FORMATION BACK 10:05 - 10:30 0.42 STWHIP P WEXIT MILLING WINDOW FREE SPIN=2460 PSI DIFF PSI=40 PSI WOB=0.7 K PVT=3310 BBLS LOSSES-1 BPH 10:30 - 11:00 0.50 STWHIP P WEXIT 600#DROP IN WOB,THIS IS THE CALCULATED BOTTOM WINDOW,WINDOW LENGTH=8 9' ALLOW STRING MILL TO DRESS OFF BOTTOM OF WINDOW BEFORE APPLYING WT TO DRILL RAT HOLE 11:00 - 11:45 0.75 STWHIP P WEXIT INCREASE ROP TO DRILL RAT HOLE IAP=957 PSI OAP=699 PSI 11:45 - 12:00 0.25 STWHIP P WEXIT RAT HOLE DRILLED,BACKREAM AT 1 FPM 12:00 - 12:20 0.33 STWHIP P WEXIT BACK REAM IS CLEAN,DOWN REAM AT 1 FPM BLEED OA DOWN FROM 700 PSI TO 400 PSI SAMPLE FROM 10311'ALL SAND 12:20 - 12:35 0.25 STWHIP P WEXIT DOWN REAM WAS CLEAN, PU FOR LAST UP REAM PASS 12:35 - 12:45 0.17 STWHIP P WEXIT DRY DRIFT IN BOTH DIRECTIONS Printed 11/5/2012 10:34:38AM North America-ALASKA- BP Page 11 of 29 Operation Summary Report Common Well Name: 18-27 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date. 9/24/2012 End Date: X3-01299(2,713,188.76) X3-01299-C:DRILL Project: Prudhoe Bay Site: PB DS 18 Rig Name/No.: NORDIC 1 Spud Date/Time: 10/11/2012 12:00:00AM Rig Release: 10/26/2012 Rig Contractor:NORDIC CALISTA UWI: Active Datum: 18-27E New RKB @53.70ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 12:45 - 12:55 0.17 STWHIP P WEXIT DRY DRIFTS ARE CLEAN,FLOW CHECK WELL AND POOH 12:55 - 14:15 1.33 STWHIP P WEXIT GOOD NO FLOW CHECK,POOH PUMPING AT MAX RATE THROUGH EDC PVT=304 BBLS 14:15 - 14:20 0.08 STWHIP P WEXIT STOP POOH TO CLEAN OUT MM 14:20 - 14:50 0.50 STWHIP P WEXIT PJSM TO LD BHA 14:50 - 15:00 0.17 STWHIP P WEXIT -FLOW CHECK WELL 15:00 - 15:30 0.50 STWHIP P ", WEXIT GOOD NO FLOW CHECK POOH AND LD WINDOW BHA 15:30 - 15:45 0.25 STWHIP P WEXIT BHA OOH,MILLS GAUGED 3.80"GO 3.79"NO GO CHECK TREE BOLTS 15:45 - 16:10 0.42 DRILL P PROD1 TREE-BOLTSAR E TIGHT,MU THE BUILD BHA 16:10 - 18:15 2.08 DRILL P PROD1 MU INJECTOR TO THE BHA AND RIH 18:15 - 20:30 2.25 DRILL P PROD1 START LOG FOR TIE-IN ONWARDS FROM 9,010'. 20:30 - 20:45 0.25 DRILL P PROD1 STOP LOGGING AT 9,201'-NO DEPTH-CORRECTION NECESSARY. CONTINUE RIH. 20:45 - 21:00 0.25 DRILL k P PROD1 TAKE SCR'S: PUMP#1: PUMP#2- 2.6 BPM-2,375 PSI- 108 SPM2.7 BPM-2,450 PSI-113 SPM 1.0 BPM-1,400 PSI-42 SPM1.0 BPM-1,440 PSI-44 SPM 0.5 BPM-1,228 PSI-22 SPM0.5 BPM-1,225 PSI-20 SPM 21:00 - 21:15 0.25 DRILL .)P PROD1 RIH TO BOTTOM. 21:15 - 22:00 0.75 DRILL P PROD1 COMMENCE DRILLING FROM 10,321'WITH ROP= 55 FPH,WOB=0.8K LBS AND CIRC PRESSURE=2,703PS1 AT 2.6 BPM(FREE SPIN=2,461 PSI AT 2.60 BPM). PVT=297 BBLS, NO LOSSES. MW IN=8.50 PPG / MW OUT=8.52 PPG / ECD=9.81 PPG IAP=457 PSI / OAP=17 PSI 22:00 - 22:50 0.83 DRILL P PROD1 NOTICE LATERAL(XY)VIBRATION UP TO"4". BLEED OFF IA FROM 700PSI,SEE-2BBLS DIESEL COMING BACK. 22:50 - 23:45 0.92 DRILL P PROD1 CONDUCT WIPER-TRIP TO WINDOW. MEANWHILE ADJUST GAMMA RAY-DISPLAY AND ALSO VERIFY L2-21A ELLIPSES ON TRAVELLING CYLIDNER-PLOT WITH ODE. 23:45 - 00:00 0.25 DRILL P PROD1 CONTINUE DRILLING AHEAD. 10/12/2012 00:00 - 01:55 1.92 DRILL P PROD1 DRILLING AHEAD FROM 10,407'.DRILL THROUGH 14N-SHALE WITHOUT GREAT COMPLICATION. ROP= 88 FPH,WOB=1.2K LBS AND CIRC PRESSURE=2,717PSI AT 2.6 BPM.PVT=292 BBLS. MW IN=8.53 PPG / MW OUT=8.59 PPG / ECD=9.91 PPG IAP=177 PSI / OAP=298 PSI 01:55 - 02:20 0.42 DRILL P PROD1 2ND 150'WIPER TO WINDOW Printed 11/5/2012 10:34:38AM ,---.: iirii .nir�' ,rna' ,rr„ ,r- gym' rr v'.ix?r.rra,-.,.�c? ,, i.;r;;;:. ;'7'"'.�,ryr o P 1'2 oT 1C5f �1�t'f12t't�c=��' �i age Operation Summary Report Common Well Name: 18-27 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:9/24/2012 End Date: X3-01299(2,713,188.76) X3-01299-C.DRILL Project:Prudhoe Bay Site: PB DS 18 Rig Name/No.: NORDIC 1 Spud Date/Time: 10/11/2012 12:00:00AM Rig Release. 10/26/2012 Rig Contractor:NORDIC CALISTA UWI: Active Datum: 18-27E New RKB @53.70ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 02:20 - 04:30 2.17 DRILL P PROD1 DRILL AHEAD.SEE 13N-SHALE AROUND 10,590'FOLLOWED BY A SHALY SECTION IN WHICH ROP DROPS DOWN TO—25FT/HR AT WOB BETWEEN 4.3-5.5K LBS.CIRC PRESSURE=—2,800PSI AT 2.56 BPM. PVT=279 BBLS / ECD=9.90 PPG IAP=299 PSI / OAP=436 PSI 04:30 - 06:30 2.00 DRILL P PROD1 -CONTINUE SLOW DRILLING AT ROP'S OF <25FT/HR. 06:30 - 07:15 0.75 DRILL P PROD? SLOW ROP,TRY APPLYING MORE WOB TO REDUCE VIBRATION ROP= 90 FPH,WOB=1.2.04K CIRC PRESSURE=2941 PSI AT 2.5 BPM MW IN=8.58 PPG t MW OUT=8.58 PPG / ECD=9.95 PPG IAP=359 PSI / OAP=497 PSI PVT=275 BBLS 07:15 - 07:35 0.33 DRILL P PROD1 WIPER TO WINDOW 07:35 - 07:40 0.08 DRILL P PROD1 PULL INTO CASING AND CIRC AT REDUCED RATE TO WASH SHAKER SCREENS,THEIR PACKING OFF 07:40 - 07:55 0.25 DRILL P PROD1 SCREENS ARE CLEANED OFF, RIH TO LOG TIE IN THEN CONTINUE RIH TO DRILL 07:55 - 08:10 0.25 DRILL P PROD1 CORRECT DEPTH+1'AND RIH 08:10 - 09:50 1.67 DRILL P PROD1 BACK ON BOTTOM DRILLING FREE SPIN —2500 PSI ROP= 100 FPH,WOB=1.6K CIRC PRESSURE=2735 PSI AT 2.5 BPM MW IN=8.58 PPG / MW OUT=8.62 PPG / ECD=10.01 PPG IAP=422 PSI / OAP=541 PSI PVT=270 BBLS 09:50 - 10:15 0.42 DRILL P PROD1 WIPER TO WINDOW PVT=270 BBLS 10:15 - 10:20 0.08 DRILL P PROD1 DRILLER NOTICED A 1%READING ON THE METHANE SENSOR AT THE SHAKER STOP POOH&SHUT DOWN PUMP AND CHECK WELL FOR FLOW 10:20 - 10:35 0.25 DRILL P PROD1 GOOD NO FLOW BRING PUMPS BACK ONLINE AND CONTINUE WIPER. NOTIFY DRLG SUPT AND CHECK POSSUM BELLY WITH HAND HELD GAS METER THERE HAS BEEN NO PIT GAIN OR RATE INCREASE ON THE OUT MICRO MOTION 10:35 - 11:00 0.42 DRILL P PROD1 HAND HELD MONITOR IS READING 4-7% WHERE THE FLUID IS RETURNING INTO THE POSSUM BELLY.THE FIXED SENSOR AT THE SHAKER IS 0%TO 1%.LINE UP TO TAKE RETURNS TO THE MGS AND CALLED DRLG SUPT ASKED THE MUD ENGINEER TO DO A MUD CHECK AND THE MUD IN THE PITS AND COMING BACK ARE BOTH 8.6 PPG SAME AS DENSITY ON BOTH MICRO-MOTIONS HAND HELD WAS PLACED NEXT TO THE FIXED SENSOR AND READ 0% Printed 11/5/2012 10:34:38AM • North America-ALASKA- BP S Page 1 .• ,° Q tion Summary Report Common Well Name: 18-27 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:9/24/2012 End Date: X3-01299(2,713,188.76) X3-01299-C:DRI LL Project:Prudhoe Bay Site:PB OS 18 Rig Name/No.: NORDIC 1 Spud Date/Time: 10/11/2012 12:00:00AM Rig Release: 10/26/2012 Rig Contractor:NORDIC CALISTA UWI: Active Datum: 18-27E New RKB @53.70ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 11:00 - 11:45 0.75 DRILL P PROD1 PULLED ABOVE WINDOW OPEN EDC AND CIRC BOTTOMS UP NO FLOW OBSERVED WHILE SHUT DOWN TO OPEN EDC MM VOL IN/OUT 992/325 BBLS BOTTOMS UP IS 100 BBLS 11:45 - 12:05 0.33 DRILL P PROD1 BOTTOMS UP WAS CLEAN,RATE&DENSITY DID NOT CHANGE 2.5 BPM IN&OUT AND DENSITY 8.57 IN AND 8.57 OUT 12:05 - 12:10 0.08 DRILL P PROD1 5 BBLS AWAY FROM 1.5 VOL AND OUT RATES &DENSITY HAVE NOT CHANGED LINE UP TO TAKE RETURNS THROUGH NORMAL FLOW PATH METHANE AT SHAKER READING 0%,CHECK RETURNS WITH HAND HELD,HAND HELD READING IS 0% 12:10 - 12:15 0.08 DRILL P PROD1 SHUT DOWN TO FLOW CHECK WELL 12:15 - 12:45 0.50 DRILL P PROD1 GOOD NO FLOW CHECK,CALL DRLG SUPT AND WE ARE OK TO GO BACK TO DRILLING GEO SAID MOST OF Z1 B LOOKED LIKE GAS AND WE DRILLED THROUGH IT FOR AT 86° FOR AWHILE 12:45 - 13:25 0.67 DRILL P PROD1 BACK ON BOTTOM DRILLING FREE SPIN 2560 PSI ROP= 100 FPH,WOB=1.6K CIRC PRESSURE=2735 PSI AT 2.5 BPM MW IN=8.58 PPG / MW OUT=8.58 PPG / ECD=10.00 PPG IAP=408 PSI / OAP=564 PSI PVT=264 BBLS 13:25 - 14:20 0.92 DRILL P PROD1 DRILLING AHEAD FREE SPIN-2600 PSI ROP= 55 FPH,WOB=3.1K CIRC PRESSURE =2930 PSI AT 2.5 BPM MW IN=8.58 PPG / MW OUT=8.59 PPG / ECD= 10.06 PPG IAP=439 PSI / OAP=576 PSI PVT=261 BBLS LOAD 40 BBLS OF MUD INTO PITS NO GAS DETECTED AT SHAKER YET, LOOKS LIKE THE MUD IS DOING ITS THING 14:20 - 15:15 0.92 DRILL P PROD1 DRILLING AHEAD FREE SPIN-2600 PSI ROP=80 FPH,WOB=5.25K CIRC PRESSURE =3311 PSI AT 2.70 BPM MW IN=8.61 PPG / MW OUT=8.61 PPG / ECD=10.09 PPG IAP=479 PSI / OAP=594 PSI PVT=300 BBLS 15:15 - 16:00 0.75 DRILL P PROD1 WIPER TO WINDOW PVT=299 BBLS 16:00 - 17:35 1.58 DRILL P PROD1 BACK ON BOTTOM DRILLING FREE SPIN -2600 PSI ROP= 25 FPH,WOB=1.5K CIRC PRESSURE =2911 PSI AT 2.5 BPM MW IN=8.62 PPG / MW OUT=8.64 PPG / ECD= 10.05 PPG IAP=515 PSI / OAP=634 PSI PVT=296 BBLS SLOW ROP Printed 11/5/2012 10:34:38AM i North America -ALASKA- BP Operation Summary Report Common Well Name: 18-27 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date: 9/24/2012 End Date: X3-01299(2,713,188 76) X3-01299-C:DRILL Project: Prudhoe Bay Site:PB DS 18 Rig Name/No.:NORDIC 1 Spud Date/Time:10/11/2012 12:00.00AM Rig Release 10/26/2012 Rig Contractor:NORDIC CALISTA UWI: Active Datum: 18-27E New RKB @53.70ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 17:35 - 18:15 0.67 DRILL P PROD1 SLOW DRILLING WITH STALLS,GEO DOES NOT THINK THIS IS THE KAVIK BUT WANTS A SAMPLE FROM THIS DEPTH PU OFF BOTTOM FOR CREW CHANGE 18:15 - 18:30 0.25 DRILL P PROD1 TD CALLED BY TOWN GEO,RIH TO BOTTOM, FLOW CHECK WELL AND POOH FOR BILLET 18:30 - 19:30 1.00 DRILL P PROD1 GOOD NO FLOW CHECK, POOH. SEE HIGH OVERPULLS AT 10,635 AND 10,610' AND DECIDE TO CLEAN SHALE SECTION BETWEEN 10,600'AND 10,650'. 19:30 - 20:00 0.50 DRILL P PROD1 CONTINUE POOH. 20:00 - 20:15 0.25 DRILL P PROD1 PULL INTO WINDOW AND FLOWCHECK WELL WHILE OPENING UP EDC-ACHIEVE GOOD NO FLOW. PVT=288BBLS. 20:15 - 20:40 0.42 DRILL P PROD1 ""***CONDUCT KICK WHILE TRIPPING DRILL WHILE POOH****** ( DRILLER SIMULATES IN INCREASE IN • RETURNS.CT DRILLER SIMULATES STOP POOH AND FLOWCHECK WELL.WELL IS FLOWING,SO SHUT IN WELL ON HCR AND INCREASE PACK-OFF PRESSURE. -AT THAT POINT WSL MET WITH DRILL CREW AT THE CHOKE MANIFOLD AND DISCUSSED THE CORRECT LINE-UP FOR TAKING RETURNS A)THOUGH THE MGS AND B)OUT TO THE TT.ALSO WSL REVIEWED STEPS TAKEN WITH NEW SLB-HAND TO ENSURE HE FULLY UNDERSTANDS THE PROTOCOL. 20:40 - 22:15 1.58 DRILL P PROD1 CONTINUE POOH TO SURFACE WHILE PUMPING AT HIGHER PUMPRATE(3.5BPM INSTEAD OF 2.6BPM DRILLING RATE). WHILE POOH AT 100FT/MIN SEE FULL RETURNS, I.E.NO LOSSES. 22:15 - 22:45 0.50 DRILL P PROD1 CONDUCT FLOWCHECK AT 200'.ACHIEVE GOOD NO FLOW. PULL TO SURFACE. ✓ 22:45 - 23:00 0.25 DRILL P PROD1 POP OFF INJECTOR AND LAY DOWN BHA#3. GRADE BIT: 1-1-WT-A-X-I-BU-TD. 23:00 - 00:00 1.00 DRILL P PROD1 LOAD BTT-TOOLS TO RIGFLOOR AND MU BHA#4 WITH 3-5/8"ALUMINUM BILLET. 10/13/2012 00:00 - 00:30 0.50 DRILL P PROD1 STAB ON INJECTOR,OPEN EDC AND PRESSURE-TEST QTS TO 250PS1/5MIN AND 4,000PSI/5MINS. TOP UP THE WELL WITH<2BBLS. 00:30 - 02:50 2.33 DRILL P PROD1 RIH WITH BHA#4 AT 76FT/MIN WHILE PUMPING THROUGH OPEN EDC. 02:50 - 03:00 0.17 DRILL P PROD1 CLOSE EDC AT 10,245'. 03:00 - 03:10 0.17 DRILL P PROD1 CONTINUE RIH TO 10,335'AND COMMENCE LOGGING FOR TIE-IN.APPLY+1 FT DEPTH-CORRECTION. 03:10 - 03:30 0.33 DRILL P PROD1 CONTINUE RIH WITH PUMPS SHUT IN. BRIEFLY SEE WEIGHT DROPPING OFF AT SHALE AROUND 10,745'. PICK UP AND MANAGE TO RUN THROUGH WITHOUT FURTHER ISSUES. Printed 11/5/2012 10:34:38AM North America -ALASKA- BP Page 15 of 294 LiaitikOperation Summary Report Common Well Name: 18-27 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:9/24/2012 End Date: X3-01299(2,713,188.76) X3-01299-C:D RI LL Project:Prudhoe Bay Site: PB DS 18 Rig Name/No.:NORDIC 1 Spud Date/time: 10/11/2012 12:00:00AM Rig Release: 10/26/2012 Rig Contractor:NORDIC CALISTA UWI: Active Datum: 18-27E New RKB @53.70ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 03:30 - 04:00 0.50 DRILL P PROD1 RIH TO 10,8Q0.PICK UP TO 10,78634'BIT DFPTH TO PI ACF TOP OF RII I FT AT 1 Q775' AT 30DEG LOHS.START PUMPS AND SET BILLET AT 4,000PSI.SLACK OF 5K LBS TO CONFIRM ANCHOR IS PROPERLY SET.PICK UP AND PULL INTERNAL ROD OUT OF BILLET. 04:00 - 04:10 0.17 DRILL P PROD1 PULL INTO WINDOW AND FLOWCHECK WELL AT 10,290'.ACHIEVE GOOD NO FLOW. 04:10 - 06:05 1.92 DRILL P PROD1 POOH HOLD PJSM TO LD BHA,MU NOZZLE TO JET STACK&FUNCTION TEST BOPE 06:05 - 06:25 0.33 DRILL P PROD1 FLOW CHECK WELL 06:25 - 07:00 0.58 DRILL P PROD1 GOOD NO FLOW,TAG UP AND LD BHA 07:00 - 07:20 0.33 DRILL P PROD1 BHA OOH, BILLET RUNNING TOOL LOOKS GOOD OFF LOAD BTT TOOLS 07:20 - 07:25 0.08 DRILL P .PROD1 MU NOZZLE TO JET STACK TO PREP FOR FUNCTION.TEST 07:25 - 07:40 0.25 DRILL P PROD1 JET STACK 07:40 - 07:45 0.08 DRILL -P PRODT- PU INJECTOR&REMOVE NOZZLE AND PREP TO FUNCTION TEST BOPE 07:45 - 07:50 0.08 DRILL P PROD1 FUNCTION TEST BOPE 07:50 - 08:10 0.33 DRILL P PROD1 PJSM TO MU DRLG BHA 08:10 - 08:20 0.17 DRILL P PROD1 MU BHA 08:20 - 10:25 2.08 DRILL P PROD1 PU INJECTOR AND MU TO BHA,TEST QT SUB AND RIH 10:25 - 10:40 0.25 DRILL' P PROD1 LOG TIE IN 10:40 - 10:50 0.17 DRILL P PROD1 CORRECT DEPTH-0.5' PU TO 8400'AND LOG THE CCL FOR THE LINER TIEBACK TOL DEPTH 10:50 - 11:25 0.58 DRILL P PROD1 LOG CCL DOWN TO 8900' 11:25 - 12:05 0.67 DRILL P PROD1 RIH TO 9400'AND LOG DOWN FOR TOL PLACEMENT 12:05 - 12:30 0.42 DRILL P PROD1 LOGGED BOTH LINER TOP PLACEMENT AREA'S,RIH CHECK RA THEN RIH TO KICK OFF BILLET 12:30 - 12:35 0.08 DRILL P PROD1 TAG SHALE AT 10630',PU AND WORK THROUGH 12:35 - 13:00 0.42 DRILL P PROD1 TAG TOP OF BILLET,PU AND START MOTOR TO KICK OFF OF BILLET FREE SPIN 3050 PSI AT 3.0 BPM START EASING DOWN TO FIND THE TOB 13:00 - 14:05 1.08 DRILL P PROD1 TAG TOB AT 10775.4'START TIME MILLING AT 1 FPH 14:05 - 14:30 0.42 DRILL P PROD1 STALL PU AND RESTART AS PER WELL PLAN &RP 14:30 - 14:40 0.17 DRILL P PROD1 DRILLED 1'START DRILLING BY DIFF PRESSURE FREE SPIN STILL-3060 PSI AT 3.00 BPM 14:40 - 15:10 0.50 DRILL P PROD1 DRILLING AHEAD FREE SPIN 3060 PSI ROP= 120 FPH,WOB=2.60 K CIRC PRESSURE=3460 PSI AT 3.12 BPM MW IN=8.64 PPG / MW OUT=8.61 PPG / ECD= 10.13 PPG IAP=331 PSI / OAP=355 PSI PVT=273 BBLS Printed 11/5/2012 10:34,38AM ,, North America -ALASKA- BP � n , _,,,,:,. . . ,... ,„...,,, . L Operation Summary Report Common Well Name: 18-27 1 AFE No Event Type: RE-ENTER-ONSHORE (RON) Start Date.9/24/2012 End Date: X3-01299(2,713,188 76) X3-01299-C:DRI LL Project:Prudhoe Bay Site: PB DS 18 Rig Name/No.: NORDIC 1 Spud Date/Time: 10/11/2012 12:00:00AM Rig Release. 10/26/2012 Rig Contractor:NORDIC CALISTA UWI: Active Datum: 18-27E New RKB @53.70ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) I (ft) 15:10 - 16:00 0.83 DRILL P PROD1 PUMP 40 BBL HI-VIS PILL FOLLOWED BY NEW MUD 16:00 - 16:30 0.50 DRILL P PROD1 WIPER TO WINDOW SHAKER SCREENS NEED TO BE PRESSURE WASHED OR CHANGED OUT,LOOSING MUD TO THE CUTTINGS BOX 16:30 - 16:45 0.25 DRILL P PROD1 PULL INTO CASING AND REDUCE RATE TO TRY CLEANING SCREENS 16:45 - 17:15 0.50 DRILL P PROD1 'SCREENS WORKING BETTER,CLOSE THE EDC AND RIH TO CONTINUE DRILLING - 17:15 - 17:20 0.08 DRILL P PROD1 OBTAIN SPR'S AND UPDATE KILL SHEET 17:20 - 19:10 1.83 DRILL P PROD1 DRILLING AHEAD FREE SPIN—3025 PSI AT 3.10 BPM ROP=90 FPH,WOB= 1.9 K CIRC PRESSURE =3345 PSI MW IN=8.55 PPG / MW OUT=8.55 PPG / ECD= 10.18 PPG IAP=342 PSI / OAP=454 PSI PVT=323 BBLS DRILLING UP AT 91°TARGETING 8636'TVD BY 11100'THEN 8643'TVD BY 11400'. TAKE SLOW PUMP RATES AT 11,000'. 19:10 - 20:45 1.58 DRILL P PROD1 PERFORM 2ND WIPER-TRIP TO WINDOW. KEEP TOOLFACE"AS DRILLED"AND SLOW DOWN PUMPRATE DOWN TO 0.2BPM THROUGHOUT SHALE-SECTION BETWEEN 10,650'AND 10,600'AND ALSO WHEN PULLING/RUNNING ACROSS BILLET. 20:45 - 22:00 1.25 DRILL P PROD1 DRILL AHEAD FROM 11.050'TO 11,200'. DRILLING PROGRESS IS NICE&STEADY EVEN WHEN DRILLING SHALES(11,130'- 11,140').ACHIEVE BUILD RATE AS PER DIRECTIONAL PLAN,SEE NO VIBRATIONS AT ALL.SMOOTH,CONTINUOUS DRILLING. ROP=100-120 FPH,WOB=1.4-1.6K LBS, CIRC PRESSURE=3,000-3,225 PSI MW IN=8.55 PPG / MW OUT=8.56 PPG / ECD=10.21 PPG IAP=513 PSI / OAP=613 PSI PVT=317 _ BBLS 22:00 - 22:50 0.83 DRILL P PROD1 PICK UP FOR 3RD 150'WIPER TRIP.AGAIN, ADJUST TOOLFACE AND PUMPRATE WHEN PULLING ACROSS SHALES&BILLET. 22:50 - 00:00 1.17 DRILL P PROD1 PULL INTO WINDOW,OPEN EDC. PVT= 315BBLS. CONTINUE PULLING UP TO 7,500'TO CLEAN OUT THE HORIZONTAL/HIGHLY DEVIATED SECTION OF THE WELL. TURN AROUND AND RUN BACK IN HOLE. 10/14/2012 00:00 - 00:30 0.50 DRILL P PROD1 CONTINUE RIH FROM WIPER TRIP. SEE HUGE AMOUNTS OF BILLET-SHAVINGS AS"BOTTOMS UP"ARRIVES AT SHAKER. OUT MICROMOTION PLUGS UP COUPLE OF TIMES. 00:30 - 00:55 0.42 DRILL P PROD1 CIRCULATE FURTHER BOTTOMS UP AT 3BPM (300FT/MIN ANNULAR VELOCITY)TO CLEAN OUT THE BILLET METAL-SHAVINGS. RETURNS HAVE GREATLY CLEANED UP AFTER BU. Printed 11/5/2012 10:34:38AM North America -ALASKA- BP • Page Operation Summary Report Common Well Name. 18-27 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:9/24/2012 End Date: X3-01299(2,713,188.76) X3-01299-C:DRILL Project:Prudhoe Bay Site:PB DS 18 Rig Name/No.:NORDIC 1 Spud Date/Time:10/11/2012 12:00:OOAM Rig Release: 10/26/2012 Rig Contractor:NORDIC CALISTA UWI: Active Datum: 18-27E New RKB @53.70ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 00:55 - 01:10 0.25 DRILL P PROD1 SHUT DOWN PUMPS AND CLOSE EDC. GEO CALLS AND ADVISES TO REACH TVD OF 8,643'BY 11,500'. 01:10 - 01:20 0.17 DRILL P PROD1 RIH TO 10,340'AND COMMENCE LOGGING FOR TIE-IN,APPLY+4'DEPTH CORRECTION. 01:20 - 01:50 0.50 DRILL P PROD1 RUN BACK TO BOTTOM AT 11,200'. 01:50 - 03:00 1.17 DRILL P PROD1 -DRILLING AHEAD TO 11,350'. CONTINUE TO SEE GOOD DRILLING PROGRESS. PVT=308 BBLS,LOSSES ARE<1 BBLS/HR. ROP=110-140 FPH,WOB=2.6-2.8 K LBS, CIRC PRESSURE=3,170-3,300 PSI MW IN=8.58 PPG f MW OUT=8.63 PPG / ECD= 10.21 PPG IAP=707 PSI / OAP=797 PSI 03:00 - 04:45 1.75 DRILL P PROD1 PERFORM 1ST 150'WIPER TO WINDOW. ORIENT TOOLFACE"AS DRILLED"AND SLOW DOWN PUMPRATES WHEN PASSING THROUGH BILLET AND SHALE-SECTION BETWEEN 10,600'-10,700'. 04:45 - 06:40 1.92 DRILL -P PROD1 DRILL AHEAD FROM 11,350'. ROP DROPS BETWEEN 11,365-11,390' -DOWN TO-5OFT/HR BEFORE RECOVERING BACK TO 100FT/HR.ONWARDS FROM 11,400' ROP IS ERRATIC BETWEEN 50-100FT/HR. PVT=300 BBLS,LOSSES ARE<1 BBLS/HR. MW IN=8.61 PPG / MW OUT=8.61 PPG / ECD=10.21 PPG IAP=721 PSI / OAP=804 PSI 06:40 - 07:00 0.33 DRILL P PROD1 PERFORM 2ND 150'WIPER TO WINDOW. 07:00 - 08:15 1.25 DRILL P PROD1 BLEED OA DOWN FROM 854 PSI TO 500 PSI 08:15 - 08:25 0.17 DRILL P PROD1 OBTAIN SPR'S 08:25 - 09:00 0.58 DRILL P PROD1 DRILLING AHEAD FREE SPIN-3170 PSI AT 3.00 BPM ROP=50 FPH,WOB=4.2 K CIRC PRESSURE =3430 PSI MW IN=8.64 PPG / MW OUT=8.61 PPG / ECD= 10.21 PPG IAP=762 PSI / OAP=540 PSI PVT=293 BBLS 09:00 - 10:15 1.25 DRILL P PROD1 DRILLING AHEAD FREE SPIN-3170 PSI AT 3.00 BPM ROP= 105 FPH,WOB=3.82 K CIRC PRESSURE=3450 PSI MW IN=8.64 PPG / MW OUT=8.64 PPG / ECD= 10.21 PPG IAP=811 PSI / OAP=562 PSI PVT=292 BBLS 10:15 - 10:55 0.67 DRILL P PROD1 DRILLING AHEAD FREE SPIN 3170 PSI AT 3.00 BPM ROP=50 FPH,WOB=4.25 K CIRC PRESSURE=3384 PSI MW IN=8.65 PPG / MW OUT=8.65 PPG / ECD= 10.37 PPG IAP=872 PSI / OAP=613 PSI PVT=293 BBLS DRILLING SHALE Printed 11/5/2012 10:34:38AM North America -ALASKA- BP .Page » Operation Summary Report Common Well Name: 18-27 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date: 9/24/2012 End Date: X3-01299(2,713,188.76) X3-01299-C:DRI LL Project:Prudhoe Bay Site: PB DS 18 Rig Name/No.: NORDIC 1 Spud Date/Time. 10/11/2012 12:00:00AM Rig Release: 10/26/2012 Rig Contractor:NORDIC CALISTA UWI: Active Datum: 18-27E New RKB @53.70ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 10:55 - 11:45 0.83 DRILL P PROD1 WIPER TO WINDOW PVT=292 BBLS DRILLED MOSTLY SHALE FROM 11365'TO 11650' 11:45 - 13:10 1.42 DRILL P PROD1 OPEN EDC AND PUH TO 7500' BOTTOMS UP FROM WINDOW DID NOT HAVE AND INCREASE IN CUTTINGS BOTTOMS UP FROM 7500'DID NOT HAVE AN INCREASE IN CUTTINGS EITHER 13:10 - 14:10 1.00 DRILL P PROD1 .CLOSE EDC,TIE IN AND RIH TO CONTINUE DRILLING GEO WANTS TO DRILL UP HOLDING 95° UNTIL WE SEE A CHANGE IN THE STRUCTURE CORRECT DEPTH+5'AND RIH 14:10 - 15:00 0.83 DRILL P PROD1 DRILLING AHEAD FREE SPIN-3310 PSI AT 3.00 BPM ROP=90 FPH,WOB=5.25 K CIRC PRESSURE=3690 PSI MW IN=8.67 PPG / MW OUT=8.65 PPG / ECD= 10.39 PPG IAP=886 PSI / OAP=674 PSI PVT=287 BBLS DRILLING UP AT 96+°-7K SURFACE WT 15:00 - 16:15 1.25 - DRILL P PROD1 GEO THINKS WE HIT A FAULT AT 11555'WITH A 15'UP THROW DRILLING AHEAD FREE SPIN-3170 PSI AT 3.00 BPM ROP=90 FPH,WOB=4.25 K CIRC PRESSURE=3468 PSI MW IN=8.68 PPG / MW OUT=8.67 PPG / ECD= 10.44 PPG IAP=939 PSI / OAP=697 PSI PVT=287 BBLS 16:15 - 18:00 1.75 DRILL P PROD1 WIPER TO WINDOW PVT=287 18:00 - 18:55 0.92 DRILL P PROD1 DRILLING AHEAD FREE SPIN-3350 PSI AT 3.00 BPM ROP= 120 FPH,WOB=3.45 K CIRC PRESSURE=3550 PSI MW IN=8.72 PPG / MW OUT=8.70 PPG / ECD= 10.44 PPG IAP=1011 PSI / OAP=771 PSI PVT=280 BBLS BLEED OA DOWN TO 500 PSI 18:55 - 19:45 0.83 DRILL P PROW DRILLING AHEAD FREE SPIN-3350 PSI AT 3.00 BPM ROP=60 FPH,WOB= 1.45 K CIRC PRESSURE=3530 PSI MW IN=8.72 PPG / MW OUT=8.69 PPG / ECD=10.66 PPG 19:45 - 20:00 0.25 DRILL P PROD1 DRILL TO 11,900'GEO CALLS TO STOP DRILLING AHEAD. 20:00 - 21:10 1.17 DRILL C PROD1 GO CONFIRMS TOP SETA BILLET. POOH. 21:10 - 22:00 0.83 DRILL C PROD1 PULL TO WINDOW,RUN BACK IN HOLE TO -11,600'TO CLEAN WELLBORE FOR SETTING BILLET. 22:00 - 22:15 0.25 DRILL C PROD1 PULL INTO WINDOW AND CONDUCT FLOWCHECK.ACHIEVE GOOD NO-FLOW. Printed 11/5/2012 10:34.38AM • North America-ALASKA- BP • Page 19 of 29 Operation Summary Report Common Well Name: 18-27 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date: 9/24/2012 End Date: X3-01299(2,713,188.76) X3-01299-C:DRILL Project:Prudhoe Bay Site:PB DS 18 Rig Name/No.:NORDIC 1 Spud Date/Time:10/11/2012 12:00:00AM Rig Release: 10/26/2012 Rig Contractor:NORDIC CALISTA UWI: Active Datum: 18-27E New RKB @53.70ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 22:15 - 00:00 1.75 DRILL C PROD1 CONTINUE POOH AT LOW SPEED TO ENHANCE CLEANING THE HORIZONTAL/ HIGHLY DEVIATED SECTION OF THE WELLBORE. MEANWHILE DEVELOP NEW DIRECTIONAL PLAN. 10/15/2012 00:00 - 03:00 3.00 DRILL C PROD1 FINALIZE DIRECTIONAL PLAN. "MEANWHILE CONTINUE TO POOH. 03:00 - 03:15 0.25 DRILL C PROD1 "JOG"BACK TO 200'AND CONDUCT FLOWCHECK.ACHIEVE GOOD NO FLOW. PULL BACK TO SURFACE. 03:15 - 03:45 0.50 DRILL C PROD1 POP OFF.INJECTOR AND LD BHA#5.GARDE BIT AS 1-1-WT-A-X-1-BU-FM. 03:45 - 04:00 0.25 DRILL C PROD1 TOP UP WELL.MEANWHILE LIFT BILLET AND SETTING TOOL ONTO CATWALK. 04:00 - 04:20 0.33 DRILL C PROD1 MU BHA#6 with 3-5/8"ALUMINUM BILLET. 04:20 - 04:45 0.42 DRILL C PROD1 STAB ON INJECTOR AND PRESSURE-TEST QTS TO 300 PSI/5MIN AND 4,000PSI/5MINS. 04:45 06:50 2.08 DRILL C PROD1 COMMENCE RIH WITH BHA#6. PVT= 206BBLS. 06:50 - 12:50 6.00 DRILL C PROD1 BILLET PLACEMENT HAS CHANGED,WAIT ON ORDERS FROM TOWN AND DD TO PLOT A NEW DIRECTIONAL PLAN 12:50 - 13:00 0.'1,7 DRILL C PROD1 RECIEVED APPROVED OCN TO SET BILLET, RIH TO TIE IN 13:00 - 13:15 0.25 DRILL C PROD1 CLOSE EDC AND TIE IN 13:15 - 14:55 1.67 DRILL C PROD1 CORRECT DEPTH-0.5' 400#DROP IN WT AT 10604'.10627'AND AT 10634'W/8K DOWN(MAX IS 10K DOWN AS PER BTT REP) TAG AT 10778.7', PU AND ORIENT BILLET TO 0°REDUCING THE AMOUNT OF SLIP AREA THAT COULD BE IN CONTACT THE BILLET FACE TAGGED TWICE AT 0°MAX DOWN-5.8K PU AND ORIENT TO 45° ROHS,2 ATTEMPTS FAILED ORIENT TO 90° ROHS.2 ATTEMPTS NO GO ORIENT TO 0°AND TRY 15 FPM TAG ABOUT A FOOT HIGHER AND NO GO TRY LIGHT WEIGHTS 1,2&3K WOB AND ORIENTING TO WORK DOWN, NO GO LINE UP DOWN THE BACKSIDE AND HOLD 100 PSI WHP AND PU NOT ABLE TO MOVE,TRY WORKING PIPE UP AND DOWN. ORIENTING AT NEUTRAL WT NO GO CALL ODE AND DRLG SUPT AND WE ARE GOING TO SET THE BILLET HERE AND POOH FOR ANOTHER ONE 14:55 - 15:10 0.25 DRILL X PROD1 LINE UP BACK DOWN THE COIL AND SET BILLET SURFACE WT AT NEUTRAL,SETTING TOOL SHEARED AT 4100 PSI THEN SHOWED 7.88K WOB PU AND WE ARE FREE,SHUT DOWN PUMP TO FLOW CHECK WELL 15:10 - 15:30 0.33 DRILL X PROD1 GOOD NO FLOW,POOH TO CASING 15:30 - 15:35 0.08 DRILL X PROD1 FLOW CHECK ABOVE WINDOW Printed 11/5/2012 10:34:38AM i North America -ALASKA-BP • : . 'nm< � _ ° Operation Summa Report, Common Well Name: 18-27 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:9/24/2012 End Date: X3-01299(2,713,188.76) X3-01299-C:DRILL Project:Prudhoe Bay Site:PB DS 18 Rig Name/No.:NORDIC 1 Spud Date/Time: 10/11/2012 12:00.00AM Rig Release: 10/26/2012 Rig Contractor:NORDIC CALISTA UWI: Active Datum: 18-27E New RKB @53.70ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 15:35 - 17:35 2.00 DRILL X PROD1 GOOD NO FLOW,POOH 17:35 - 17:40 0.08 DRILL X PROD1 FLOW CHECK WELL 17:40 - 18:00 0.33 DRILL X PROD1 GOOD NO FLOW,TAG UP, REMOVE INJECTOR AND LD BILLET SETTING BHA 18:00 - 18:15 0.25 DRILL X PROD1 LD BHA#6. 18:15 - 18:40 0.42 DRILL X PROD1 --PREPARE BILLET AND SETTING TOOL FOR RUNNING IN HOLE. 18:40 - 19:00 0.33 DRILL X PROD1 MU BHA#7. AGREE WITH BTT-HAND TO SET BILLET AT 0° HS FOR 60°LOHS-EXIT. 19:00 - 19:25 0.42 DRILL X PROD1 STAB ON'INJECTOR AND TEST QTS TO 300PSI/5rMISN AND 4,000/5MINS. 19:25 - 21:50 2.42 DRILL X PROD1 RIH WITH BILLET#3. 21:50 - 22:00 0.17 DRILL X PROD1 RUN TO 10,245'AND CLOSE EDC.CONTINUE TO 10,330' 22:00 - 22:20 0.33 DRILL X PROD1 LOG FOR TIE-IN TO RA-TAG-0'DEPTH CORRECTION. 22:20 - 22:40 0.33 DRILL X PROD1 RIH TO 10,514.PICK UP TO 10,511.34'BIT DEPTH TO PLACE TOP OF BILLET#3 AT 10,500'AT 0°HS. START PUMPS AND SET BILLET AT 3 800PSI. SLACK OF-5K LBS TO CONFIRM ANCHOR IS PROPERLY SET. PICK UP AND PULL INTERNAL ROD OUT OF BILLET.SEE GOOD PUW AND START POOH. 22:40 - 00:00 1.33 DRILL C PROD1 POOH WITH BHA#7. 10/16/2012 00:00 - 00:45 0.75 DRILL X PROD1 POOH TO SURFACE AND"JOB"COIL BACK DOWN TO 200'. ✓ 00:45 - 01:05 0.33 DRILL X PROD1 FLOWCHECK COIL-ACHIEVE GOOD NO-FLOW. 01:05 - 02:00 0.92 DRILL X PROD1 PULL BHA#7 TO SURFACE.POP OFF LUBRICATOR AND LD BHA. 02:00 - 02:20 0.33 DRILL X PROD1 MU BHA#8 WITH 2-7/8"ULS MOTOR AND 4-1/8"HCC-BICENTER(BHA#8 IS IDENTICAL TO BHA#5). 02:20 - 02:45 0.42 DRILL X PROD1 STAB ON INJECTOR AND PRESSURE-TEST QTS TO 300PSI/5MINS AND 4,000PSI/5MINS. 02:45 - 04:50 2.08 DRILL X PROD1 RIH WITH BHA#8 TO 10,340'. 04:50 - 05:15 0.42 DRILL X PROD1 LOG FOR TIE-IN TO RA-TAG-0'DEPTH CORRECTION AND TAKE SPR'S. 05:15 - 06:35 1.33 DRILL X PROD1 RIH TO 10,475'AND DRY-TAG TOP OF BILLET AT 10,501'. PU TO 10,490',ORIENT HOT AND BRING PUMPS TO 2.9BPM(FREESPIN 3,040PSI @2.5BPM). START TIME MILLING DOWN FROM 10,497'. TAG TOP OF BILLET AT 10,500'. CIRC PRESSURE=2996 PSI @ 2.8BPM,PVT= 244 BBLS(NO LOSSES) MW IN=8.74 PPG / MW OUT=8.74 PPG / ECD=10.33 PPG IAP=15 PSI / OAP=0 PSI 06:35 - 06:45 0.17 DRILL X PROD1 NOT SEEING ANY MOTOR WORK OR WOB, CONTINUE TIME MILLING AND CHECK SHAKER FOR BILLET CUTTINGS Printed 11/5/2012 10:34:38AM North America -ALASKA- BP Operation Summary Report Common Well Name: 18-27 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:9/24/2012 End Date. X3-01299(2,713,188.76) X3-01299-C:DRILL Project:Prudhoe Bay Site:PB DS 18 Rig Name/No.:NORDIC 1 Spud Date/Time: 10/11/2012 12:00:00AM Rig Release: 10/26/2012 Rig Contractor:NORDIC CALISTA UWI: Active Datum: 18-27E New RKB @53.70ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 06:45 - 06:55 0.17 DRILL X PROD1 NOT SEEING ANY ALUMINUM AT THE SHAKER LOOK BACK AT THE MWD PRESSURES& WOB AND I DO NOT SEE ANY CHANGE IN PRESSURE OR WOB 06:55 - 08:30 1.58 DRILL X PROD1 GETTING MOTOR WORK AND 1.3K WOB, START TIME MILLING OUR FIRST 1'OR UNTIL `WE SEE CUTTINGS THAT TELL US THERE WAS WERE MILLING BEFORE THIS DEPTH 0 OUT MM FOR BOTTOMS UP AND CONTINUE TO CHECK FOR BILLET ALUMINIUM 08:00 - 09:15 1.25 DRILL X PROD1 START DRILLING BY DIFF PRESSURE AND WOB 09:45 - 10:00 0.25 DRILL X PROD1 DRILLING AHEAD FREE SPIN-3200 PSI AT 3.00 BPM ROP= 110 FPH,WOB=2.9 K CIRC PRESSURE=3604 PSI MW IN=8.68 PPG / MW OUT=8.76 PPG / ECD= 10.44 PPG IAP=393 PSI / OAP=11 PSI PVT=235 BBLS 10:00 - 10:15 0.25 DRILL X PROD1 PUMP 40 BBL HI-VIS PILL(NEW MUD) 10:15 - 10:30 0.25 DRILL X PROD1 WIPER TO WINDOW PVT=51 BBLS REMOVE PITS 1,2%4 FROM ACTIVE TO PREP FOR MUD SWAP 10:30 - 11:15 0.75 DRILL X PROD1 AT THE WINDOW,OPEN EDC AND POOH JETTING TUBING TO 7500'TO SWEEP OUT BILLET CUTTINGS 11:15 - 11:50 0.58 DRILL X PROD1 7500'RIH 11:50 - 12:05 0.25 DRILL X PROD1 STOP ABOVE WINDOW AND SWAP TO NEW ✓ MUD 12:05 - 12:20 0.25 DRILL X PROD1 MUD AT THE TOOL,CLOSE EDC AND LOG TIE IN 12:20 - 12:35 0.25 DRILL X PROD1 +2'RIH TO CONTINUE DRILLING 12:35 - 13:20 0.75 DRILL X PROD1 DRILLING AHEAD FREE SPIN-3100 PSI AT 3.13 BPM ROP=110 FPH,WOB=1.66K CIRC PRESSURE=3440 PSI MW IN=8.55 PPG / MW OUT=8.76 PPG / ECD= 10.15 PPG (OUT DENSITY STILL REFLECTS OLD MUD,SWAP ALMOST COMPLETE) IAP=354 PSI / OAP=44 PSI PVT=MUD SWAP IN PROGRESS 13:20 - 14:40 1.33 DRILL X PROD1 DRILLING AHEAD FREE SPIN 3100 PSI AT 3.13 BPM ROP=80 FPH,WOB=6.64K CIRC PRESSURE =3670 PSI MW IN=8.56 PPG / MW OUT=8.56 PPG / ECD= 10.15 PPG IAP=339 PSI / OAP=33 PSI PVT=STILL FILLING PITS FROM MUD SWAP 14:40 - 15:10 0.50 DRILL X PROD1 WIPER TO WINDOW 15:10 - 16:00 0.83 DRILL X PROD1 DRILLING AHEAD FREE SPIN-3060 PSI AT 2.99 BPM ROP= 120 FPH,WOB=2.68K CIRC PRESSURE=3267 PSI MW IN=8.58 PPG / MW OUT=8.61 PPG / ECD= 10.16 PPG IAP=446 PSI / OAP=87 PSI PVT=326 Printed 11/5/2012 10:34:38AM North America -ALASKA- BP Page 22 of 29 Operation Summary Report Common Well Name: 18-27 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date: 9/24/2012 End Date: X3-01299(2,713,188.76) X3-01299-C:DRILL Project: Prudhoe Bay Site: PB DS 18 Rig Name/No.: NORDIC 1 Spud Date/Time: 10/11/2012 12:00:00AM Rig Release: 10/26/2012 Rig Contractor: NORDIC CALISTA UWI: Active Datum: 18-27E New RKB @53.70ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 16:00 - 16:30 0.50 DRILL X PROD1 DRILLING AHEAD FREE SPIN 3100 PSI AT 3.13 BPM ROP=120 FPH,WOB=2.76K CIRC PRESSURE=3259 PSI MW IN=8.58 PPG / MW OUT=8.61 PPG / ECD= 10.16 PPG IAP=448 PSI / OAP=88 PSI PVT=325 16:30 - 17:15 0.75 DRILL X PROM WIPER TOP WINDOW PVT=325 BBLS 17:15 - 19:00 1.75 DRILL X PROD1 DRILL AHEAD FROM 10,950'TO 11,100'. MW IN AND OUT 8.65 PPG,ECD 10.27 PPG. 19:00 - 21:30 2.50 DRILL X PROD1 WIPER TRIP. TRIP UP TO WINDOW GOOD. NO ISSUES PASSING BY BILLET. CONSULT WITH GEO,HIGHCONTENT OF SHALE AND CLAYSTONE IN RETURNS. PULL INTO WINDOW,OPEN EDC. JET AT 3.9 BPM FROM WINDOW TO 7500'. SLIGHT INCREASE IN CUTTINGS,PREDOMINANTLY SHALE. CIRCULATE BOTTOMS UP AT 7500',LARGER CUTTINGS AND METAL SHAVINGS ACROSS SHAKER. RUN BACK DOWN AT FAST RATE TO HELP MOVE CUTTINGS OUT. CONTINUE TO SEE METAL SHAVINGS AND LARGER CUTTINGS ACROSS SHAKER. CIRCULATE BOTTOMS UP FROM WINDOW;CUTTINGS RETURNS DIMINISH WITH VERY LITTLE RETURNS WITH BOTTOMS UP. CLOSE EDC. 21:30 - 22:00 0.50 DRILL X PROD1 CONDUCT TIE-IN WITH+3.5 CORRECTION. CONTINUE TO RIH TO BOTTOM WITH NO ISSUES. 22:00 - 00:00 2.00 DRILL X PROD1 DRILL AHEAD FROM 11,100'. FREE SPIN 2750 PSI AT 2.7 BPM. -2.6-2.9 BPM,2900-3220 PSI,MW IN 8.6 PPG, MW OUT 8.62 PPG, ECD 10.28 PPG,1.4-4.7K WOB,ROP 70-80 FPH -NO LOSSES,CONSISTENT CUTTINGS ACROSS SHAKERS PREDOMINANTLY SANDSTONE MIXED WITH SHALE 10/17/2012 00:00 - 00:30 0.50 DRILL X PROD1 DRILL AHEAD TO 11,250'. -2.6-2.9 BPM,2900-3220 PSI, MW IN 8.6 PPG, MW OUT 8.62 PPG, ECD 10.28 PPG,1.4-4.7K WOB,ROP 70-80 FPH -NO LOSSES,CONSISTENT CUTTINGS ACROSS SHAKERS PREDOMINANTLY SANDSTONE MIXED WITH SHALE 00:30 - 01:40 1.17 DRILL X PROD1 WIPER TRIP TO WINDOW WITH NO ISSUES. RUN BACK DOWN WITH NO ISSUES. LOSS OF 4 BBLS ON WIPER TRIP. 01:40 - 03:30 1.83 DRILL X PROD1 DRILL AHEAD FROM 11,250'. FREE SPIN 3035 PSI AT 2.92 BPM. -2.85 BPM,3215 PSI,MW IN 8.64 PPG,MW OUT 8.68 PPG, ECD 10.39 PPG,1.87-2.29K WOB,80-90 ROP -SAMPLES REVEALING INTERBEDDED SILTSTONE/SANDSTONE WITH INTERMITTENT SHALE 03:30 - 04:45 1.25 DRILL X PROD1 WIPER TRIP TO WINDOW AND BACK DOWN WITH NO ISSUES. 04:45 - 06:30 1.75 DRILL X PROD1 DRILL AHEAD FROM 11,400'. FREE SPIN 3065 PSI AT 2.90 BPM. MW IN 8.67 PPG, MW OUT 8.73 PPG, ECD 10.45 PPG, PVT 307 BBLS. Printed 11/5/2012 10:34:38AM North America -ALASKA-BP Page 23 of 29 Operation Summary Report Common Well Name. 18-27 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:9/24/2012 End Date: X3-01299(2,713,188.76) X3-01299-C:DRILL Project: Prudhoe Bay Site: PB DS 18 Rig Name/No.: NORDIC 1 Spud Date/Time: 10/11/2012 12:00:00AM Rig Release: 10/26/2012 Rig Contractor:NORDIC CALISTA UWI: Active Datum: 18-27E New RKB @53.70ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 06:30 - 07:10 0.67 DRILL X PROD1 WIPER TO WINDOW PVT=306 BBLS PUMP 20 BBL HI-VIS PILL,TIME TO COME OUT JUST BELOW THE WINDOW 07:10 - 08:10 1.00 DRILL X PROD1 OPEN EDC AND POOH TO 7500' 08:10 - 09:00 0.83 DRILL X PROD1 7500'RIH PILL DID NOT HAVE ANY SIGNIFICANT INCREASE IN CUTTINGS 09:00 - 09:05 0.08 DRILL X PROD1 CLOSE EDC AND LOG TIE IN 09:05 - 10:05 1.00 DRILL X PROD1 CORRECT DEPTH+3.5'AND RIH 10:05 - 10:45 0.67 DRILL X PROD1 DRILLING AHEAD FREE SPIN 3060 PSI AT 2.90 BPM ROP=140 FPH,WOB=2.3K CIRC PRESSURE =3400 PSI MW IN=8.69 PPG / MW OUT=8.69 PPG / ECD=10.55 PPG IAP=950 PSI / OAP=539 PSI PVT=300 BBLS PU TO OBTAIN SLOW PUMP RATES 10:45 - 11:30 0.75 DRILL X PROD1 LOOKS LIKE WE DRILLED INTO THE FAULT AT 11601',STARTING TO TAKE A LOT MORE SURFACE WEIGHT AND WOB TO DRILL 11:30 - 11:55 0.42 DRILL. X PROD1 DRILLING AHEAD FREE SPIN-3060 PSI AT 2.90 BPM ROP=75 FPH,WOB=6.5K CIRC PRESSURE =3655 PSI MW IN=8.69 PPG / MW OUT=8.72 PPG / ECD= 10.48 PPG IAP=980 PSI / OAP=549 PSI PVT=300 BBLS 11:55 - 13:30 1.58 DRILL X PROD1 WIPER TO WINDOW NO LOSSES CROSSING FAULT,GEO WANTS TO DROP A LITTLE ANGLE AND FIND THE BASE OF Z1A. CALL FOR TRUCKS TO SWAP MUD 13:30 - 14:30 1.00 DRILL X PROD1 DRILLING AHEAD FREE SPIN 3060 PSI AT 3.05 BPM ROP=80 FPH,WOB=6.5K CIRC PRESSURE =3595 PSI MW IN=8.71 PPG / MW OUT=8.70 PPG / ECD=10.61 PPG IAP=1030 PSI / OAP=585 PSI PVT=292 BBLS 14:30 - 15:00 0.50 DRILL X PROD1 DRILLING AHEAD FREE SPIN 3060 PSI AT 3.05 BPM ROP=80 FPH,WOB=6.5K CIRC PRESSURE =3595 PSI MW IN=8.71 PPG / MW OUT=8.70 PPG / ECD= 10.61 PPG IAP= 1030 PSI / OAP=585 PSI PVT=292 BBLS 15:00 - 15:20 0.33 DRILL X PROD1 DRILLING AHEAD FREE SPIN 3060 PSI AT 3.05 BPM ROP=80 FPH,WOB=6.5K CIRC PRESSURE =3595 PSI MW IN=8.71 PPG / MW OUT=8.70 PPG / ECD= 10.61 PPG IAP=1030 PSI / OAP=585 PSI PVT=292 BBLS 15:20 - 17:25 2.08 DRILL X PROD1 WIPER TO WINDOW PVT=289 BBLS Printed 11/5/2012 10:34:38AM • North America-ALASKA- BP Page 24 of 29 Operation Summary Report Common Well Name: 18-27 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date: 9/24/2012 End Date: X3-01299(2,713,188.76) X3-01299-C:DR I LL Project:Prudhoe Bay Site: PB DS 18 Rig Name/No.: NORDIC 1 Spud Date/Time: 10/11/2012 12:00:00AM Rig Release: 10/26/2012 Rig Contractor:NORDIC CALISTA UWI: Active Datum: 18-27E New RKB @53.70ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 17:25 - 19:30 2.08 DRILL X PROD1 DRILLING AHEAD FREE SPIN 3100 PSI AT 2.9 BPM ROP= 145 FPH,WOB=2.1K CIRC PRESSURE =3595 PSI MW IN=8.77 PPG / MW OUT=8.88 PPG / ECD= 10.65 PPG IAP= 1071 PSI / OAP=632 PSI PVT= 100 —BBLS ISOLATE TO 1 PIT TO PREP FOR MUD ,SWAP 19:30 - 00:00 4.50 DRILL P PROD1 WIPER TRIP UP TO WINDOW GOOD. PULL INTO WINDOW,OPEN EDC AND JET TUBING UP TO 7500'. SLIGHT INCREASE IN CUTTINGS ACROSS SHAKER. CONTINUE PUMPING AT HIGH RATE WHILE RUNNING IN HOLE. ASSISTED IN CLEANING CUTTINGS. TAKE WEIGHT AT 8780', PICK UP AND TAKE WEIGHT AGAIN. MOVE DOWN TO 9000', PICK UP SLOWLY AND WASH PAST TO 8600'. NO ISSUES. RUN BACK DOWN,NO ISSUES AND NOTHING NOTED ACROSS SHAKERS. CONTINUE TO RIH TO WINDOW,CLOSE EDC. LOG TIE-IN WITH+4.5'CORRECTION. RIH TO COMPLETE WIPER TRIP. 10/18/2012 00:00 - 00:20 0.33 DRILL- P PROD1 COMPLETE RIH WITH NO PROBLEMS. OBTAIN SLOW PUMP RATES. 00:20 - 02:00 1.67 DRILL P PROD1 BEGIN DRILLING AHEAD FROM 12,000'. FREE SPIN 3030 PSI AT 3.0 BPM. -3 BPM,3230-3580 PSI,MW IN 8.60 PPG,MW OUT 8.63 PPG, ECD 10.28-10.44 PPG,WOB 1.51-4.56K,ROP 20-135 FPH -IA 1050 PSI,OA 605 PSI 02:00 - 04:15 2.25 DRILL P PROD1 WIPER TRIP TO WINDOW AND BACK DOWN WITH NO ISSUES PASSING THROUGH SMALL SHALE ZONE AND NO LOSSES. 04:15 - 05:30 1.25 DRILL P PROD1 DRILL AHEAD FROM 12,150'. FREE SPIN 3035 PSI AT 2.9 BPM. -3 BPM,3430-3510 PSI, MW IN 8.65 PPG,MW OUT 8.7 PPG, ECD 1057 PPG,WOB 2.39-2.55K, 135 AVERAGE ROP -IA 1135 PSI,OA 670 PSI,NO LOSSES NOTED 05:30 - 07:05 1.58 DRILL P PROD1 WIPER TRIP TO WINDOW STILL SEE A LITTLE BOBBLE AT 10700'GOING DOWN ANOTHER BOBBLE IN WT AT 11670'(BOTH DIRECTIONS BUT NO MOTOR WORK)WHICH COULD BE THE FAULT ON THE UPPER PART OF THE BHA Printed 11/5/2012 10:34:38AM • „.. North America-ALASKA- BP • Page 25 of 29 O ,b.+eration Summa Re ort aao-ec«.i.;naw�mrµz�,me .rss-avw: r!n �✓!air�; +vrai�,*ar,v � Common Well Name: 18-27 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:9/24/2012 End Date: X3-01299(2,713,188.76) X3-01299-C:DRILL Project:Prudhoe Bay Site:PB DS 18 Rig Name/No.: NORDIC 1 Spud Date/Time: 10/11/2012 12:00:00AM Rig Release: 10/26/2012 Rig Contractor:NORDIC CALISTA UWI: Active Datum: 18-27E New RKB©53.70ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 07.05 - 07:45 0.67 DRILL P PROD1 ***HOLD KICK WHILE TRIPPING DRILL*** CTS SUPERVISOR ANNOUNCE THAT HE HAS AN INCREASE IN FLOW WHILE TRIPPING IN THE HOLE.HE STOPPED RIH AND SHUT DOWN HIS PUMP THE NORDIC DRILLER HAD HIS FLOOR HAND AT THE SHAKER TO MONITOR THE WELL FOR FLOW.HE REPORTED BACK THAT HE HAD FLOW AT THE SHAKER AND THE DRILLER FOLLOWED HIS STANDING ORDERS AND SHUT THE WELL IN WITH THE HCR.ONCE WE WERE LINED UP TO A CLOSED CHOKE&MGS WE EQUALIZED OUR PRESSURE THEN OPENED THE HCR TO MONITOR THE WHP.WE SIMULATED A PIT GAIN OF 2 BBLS AND 50 PSI WHP.ONCE WE GOT APPROVAL FROM TOWN,WE OPENED UP OUR CHOKE AND STARTED OUR FIRST DRILLERS METHOD CIRCULATION AND BROUGHT A SMALL AMOUNT OF GAS BACK TO SURFACE.WE FLOW CHECKED THE WELL AND THE WELL WAS DEAD. 07:45 - 08:00 0.25 DRILL P PROD't OBTAIN SPR'S THE CONTINUE DRILLING 08:00 - 09:00 1.00 DRILL P PROD1 DRILLING AHEAD FREE SPIN 3194 PSI AT 3.0 BPM ROP=140 FPH,WOB=2.4K CIRC PRESSURE =3580 PSI MW IN=8.67 PPG / MW OUT=8.69 PPG / ECD=10.57 PPG IAP=1140 PSI / OAP=680 PSI PVT=292 BBLS 09:00 - 10:15 1.25 DRILL P PROD1 WIPER TO WINDOW PVT=284 10:15 - 11:40 1.42 DRILL P PROD1 OPEN EDC AND JET UP TO 7500' NO INCREASE IN CUTTINGS 11:40 - 11:50 0.17 DRILL P PROD1 LOG TIE IN -------- ------- 11:50 - 13:05 1.25 DRILL P PROD1 CORRECT DEPTH+6'AND RIH TO CONTINUE DRILLING DID NOT SEE ANY ISSUES RUNNING PAST 10690-10700 13:05 - 13:25 0.33 DRILL P PROD1 DRILLING AHEAD FREE SPIN 3100 PSI AT 3.0 BPM ROP=150 FPH,WOB=2.58K CIRC PRESSURE=3580 PSI MW IN=8.68 PPG / MW OUT=8.66 PPG / ECD=10.56 PPG IAP=1180 PSI / OAP=774 PSI PVT=266 BBLS 13:25 - 14:15 0.83 DRILL P PROD1 DRILLING AHEAD FREE SPIN—3100 PSI AT 3.0 BPM ROP=150 FPH,WOB=2.78K CIRC PRESSURE=3575 PSI MW IN=8.69 PPG / MW OUT=8.67 PPG / ECD=10.60 PPG IAP=1206 PSI / OAP=756 PSI PVT=265 BBLS Printed 11/5/2012 10:34:38AM '"?`*-;-" • North America -ALASKA- BP • Page 26 o ,f0 Operation Summary Report Common Well Name: 18-27 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:9/24/2012 End Date: X3-01299(2,713,188.76) X3-01299-C:DRILL Project:Prudhoe Bay Site:PB DS 18 Rig Name/No.: NORDIC 1 Spud Date/Time: 10/11/2012 12:00:00AM Rig Release: 10/26/2012 Rig Contractor NORDIC CALISTA UWI: Active Datum. 18-27E New RKB @53.70ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 14:15 - 15:25 1.17 DRILL P PROD1 DRILLED TO VVITHIN 5'OF OUR NEXT VVIPER HIT A FAULT AND WE ARE LOOSING 95%OF OUR RETURNS PU OFF BOTTOM AND START PULLING TO THE WINDOW.CALLED FOR MORE FLUID AND REDUCED OUR RATE TO CONSERVE FLUID MADE CALLS TO DRLG SUPT&ODE —AND ONCE WE HAVE MORE FLUID WE WILL FOLLOW THE RP TO DRILL AHEAD 100AND REEVALUATE 15:25 - 17:50 2.42 DRILL P PROD1 PULLED INTO CASING TO VVAIT ON FLUIDS PVT= 193 BBLS IN&OUT RATES 1.0 IN/0.45 OUT 17:50 - 19:20 1.50 DRILL P PROD1 2ND TRUCK ON LOCATION RIH TO DRILL AHEAD WITH USED MUD. LINE UP WITH MUD 19:20 - 21:40 2.33 DRILL P PROD1 OBTAIN SLOW PUMP RATES VVITH NEVV MUD SYSTEM. 100%LOSSES AT 12,590'. LINE UP TO PUMP DOWN BACK SIDE. FREE SPIN 2800 AT 2.6 BPM. -PUMP DOWN BACK SIDE AT.25 BPM WHILE DRILLING AHEAD, NO RETURNS. INCREASE TO.5 BPM,THEN TO.75 BPM WITH NO RETURNS. RETURNS AT 1 BPM DOWN BACKSIDE. POSITIVE WELL HEAD PRESSURE WITH 24 BBLS AWAY AT 12,613'. STOP PUMPING DOWN BACKSIDE AND STILL HAVE RETURNS. FLOW IN 2.6 BPM,FLOW OUT 1 35 BPM -DRILL TO 12,625',WIPER TO LOSS ZONE AT 12,590'. RUN BACK DOWN AND CONTINUE TO DRILL AHEAD AT 2.65 BPM WITH 1.58 TO 1.75 BPM OUT RATE. -DRILL TO 12,650',WIPER TO LOSS ZONE. RUN BACK DOWN AND DRILL AHEAD AT 2.65 BPM IN,CONSISTENT 1.70 BPM OUT. -DRILL TO 12,675',WIPER TO LOSS ZONE. RUN BACK DOWN AND CONTINUE DRILLING AHEAD AT 2 60-2.65 BPM IN,1.70-1.76 BPM OUT RATE. -DRILL TO 12,695'. BEGIN WIPER TO WINDOW WHILE DISCUSSING FORWARD PLAN WITH ODE. 21:40 - 00:00 2.33 DRILL P PROD1 WIPER TRIP TO WINDOW WITH 2.65 BPM IN, OUT RATE INCREASE FROM 1 72 BPM TO 1 84 BPM ABOVE THIEF ZONE AT 12,592'. NO ISSUES ON TRIP TO WINDOW. ODE CONFIRMS THAT PLAN FORWARD IS TO DRILL AHEAD WITH LOSSES MANAGING FLUIDS AND MONITORING WELL. BEGIN TRIP BACK DOWN FROM WINDOW. -PVT 322 BBBLS,95 BBLS ON TRUCK,ONE OTHER TRUCK ROUND TRIPPING WITH MUD -LOSSES SLOW TO.3 BPM AS BHA APPROACHES WINDOW -IA AT 380 PSI,OA AT 185 PSI 10/19/2012 00:00 - 00:10 0.17 DRILL P PROD1 WIPER TRIP BACK TO BOTTOM VVITH NO ISSUES.AVERAGE RATE IN 2 6 BPM, AVERAGE RATE OUT 1.95 BPM. MW IN AND OUT 8.73 PPG. Printed 11/5/2012 10:34:38AM North America-ALASKA- BP • Page �4 Operation Summary Report Common Well Name: 18-27 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:9/24/2012 End Date X3-01299(2,713,188.76) X3-01299-C.DRILL Project:Prudhoe Bay Site: PB DS 18 Rig Name/No.: NORDIC 1 Spud Date/Time: 10/11/2012 12'00:OOAM Rig Release: 10/26/2012 Rig Contractor:NORDIC CALISTA UWI: Active Datum: 18-27E New RKB @53.70ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 00:10 - 00:30 0.33 DRILL P PROD1 KICK WHILE TRIPPING DRILL. SHUT IN HCR AND SIMULATE LOSS OF PACKOFF PRESSURE WHILE SLOWLY MOVING COIL UP AFTER CONFIRMING FLOW AND ATTEMPTING TO SHUT IN WELL FOLLOWING STANDING ORDERS. CREW CONTINUES WITH SHUTTING IN BY SIMULATING STOPPING MOVING COIL AND UTILIZING UPPER 2-3/8"COMBIS TO SHUT IN WELL. CONTINUE WITH SIMULATION OF NOTIFICATIONS. CONDUCT AAR. 00:30 - 01:30 1.00 DRILL P PROD1 WIPER TRIP BACK TO BOTTOM WITH NO ISSUES. TOTAL LOST ON WIPER TRIP 125 BBLS. AVERAGE RATE IN 2.6 BPM,AVERAGE RATE OUT 1.95 BPM. MW IN AND OUT 8.73 PPG. 01:30 - 04:00 2.50 DRILL P PROD1 DRILL AHEAD FROM 12,695'. FREE SPIN 3010 PSI AT 2.6 BPM. DRILL AHEAD WITH 2.55-2.6 BPM IN RATE,AVERAGING 1.86-1.95 BPM OUT RATE. -DRILLTO 12,750'.WIPE TO LOSS ZONE AT 12,590'. CLEAN PICK UP. RUN BACK DOWN. -DRILL TO 12,800'AND WIPE TO LOSS ZONE. CLEAN PICK UP WITH 36K PUW. RUN BACK DOWN,SOW 8K. -DRILL AHEAD TO 12,850'AT 2.6 BPM IN RATE,2.1 BPM OUT RATE. MW IN 8.7 PPG, MW OUT 8.75 PPG. -IA 490 PSI,OA 205 PSI 04:00 - 06:50 2.83 DRILL P PROD1 WIPER TRIP TO WINDOW WITH NO ISSUES. LOSS RATE DURING WIPER TRIP APPROXIMATELY 25%. TWO TRUCKS ON LOCATION WITH MUD. 06:50 - 07:25 0.58 DRILL P PROD1 RIH FROM 7500' 07:25 - 07:35 0.17 DRILL P PROD1 STOP TO CLOSE EDC AND CHECK STATIC LOSS RATE 07:35 - 07:55 0.33 DRILL P PROD1 STATIC LOSS RATE IS 0 BPM LOG TIE IN CORRECT DEPTH+8'AND RIH TO CONTINUE DRILLING LOOKS LIKE WE WILL BE ABLE TO DRILL TO TD, START BRINGING THE 2-7/8"LINER BACK IN THE PIPE SHED 07:55 - 09:10 1.25 DRILL P PROD1 OBTAIN SLOW PUMP RATES 09:10 - 09:45 0.58 DRILL P PROD1 DRILLING AHEAD FREE SPIN—3100 PSI AT 3.0 BPM ROP= 150 FPH,WOB= 1.55K CIRC PRESSURE=3417 PSI MW IN=8.67 PPG / MW OUT=8.65 PPG / ECD= 10.53 PPG IAP=493 PSI / OAP=243 PSI PVT=266 BBLS BHP=4715 PSI LOSS RATE IS 21%=2.9 BPM IN /2.3 BPM OUT Printed 11/5/2012 10.34:38AM . .. ; x North America-ALASKA- BP Page 2m , Operation Summary Report Common Well Name: 18-27 AFE No Event Type. RE-ENTER-ONSHORE(RON) Start Date:9/24/2012 End Date. X3-01299(2,713,188.76) X3-01299-C:DRI LL Project:Prudhoe Bay Site:PB DS 18 Rig Name/No.:NORDIC 1 Spud Date/Time:10/11/2012 12:00:00AM Rig Release: 10/26/2012 Rig Contractor:NORDIC CALISTA UWI: Active Datum: 18-27E New RKB @53.70ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 09:45 - 11:10 1.42 DRILL P PROD1 DRILLING AHEAD FREE SPIN-3100 PSI AT 3.0 BPM ROP=105 FPH,WOB=3.08K CIRC PRESSURE=3622 PSI MW IN=8.67 PPG / MW OUT=8.65 PPG / ECD= 10.56 PPG IAP=526 PSI / OAP=254 PSI PVT=249 'BBLS BHP=4729 PSI LOSS RATE IS 20%=3.0 BPM IN /2.39 BPM OUT 11:10 - 14:20 3.17 DRILL P PROD1 WIPER TO WINDOW PVT=269 BBLS 14:20 - 15:30 1.17 DRILL P PROD1 BACK ON.BOTTOM DRILLING FREE SPIN -3200 PSI AT 3.0 BPM ROP=90 FPH,WOB=2.94K CIRC PRESSURE =3460 PSI MW IN=8.63 PPG / MW OUT=8.63 PPG / ECD= 10.50 PPG IAP=599 PSI / OAP=332 PSI PVT=280 BBLS BHP=4698 PSI LOSS RATE IS 18%=2.93 BPM IN /2.43 BPM OUT 15:30 - 16:45 1.25 DRILL P PROD1 CONTINUE DRILLING AHEAD FREE SPIN .-3200 PSI AT 3.0 BPM -ROP= 150 FPH,WOB=2.33K CIRC PRESSURE=3468 PSI MW IN=8.65 PPG I MW OUT=8.63 PPG / ECD= 10.49 PPG IAP=632 PSI / OAP 339 PSI PVT=246 BBLS BHP=4699 PSI LOSS RATE IS 19%=2.95 j BPM IN /2.40 BPM OUT 16:45 - 18:30 1.75 DRILL P PROD1 DRILLED WELL TO TD AT 13185'POOH TO TIE IN 18:30 - 18:40 0.17 DRILL P PROD1 TIE IN 18:40 - 20:30 1.83 DRILL P PROD1 CORRECT DEPTH+5.5'AND RIH TO TD TAG BOTTOM TWO TIMES AT 13,187'CORRECTED DEPTH WITH 1K DOWN WEIGHT. FLOW CHECK ON BOTTOM BEFORE PULLING OUT OF HOLE FLOW CHECK GOOD. 20:30 - 00:00 3.50 DRILL P PROD1 POH LAYING IN LINER PILL LOSING 24 BPH WHILE POH BELOW LOSS ZONE WITH 1 BPM PUMP RATE LOWER RATE TO 6 BPM AND LOSS RATE DROPPED TO 6 BPH. CONTINUE POH TO WINDOW. FLOW CHECK AT WINDOW.NO FLOW OPEN EDC. COME ON WITH PUMPS.WASH ACROSS WHIPSTOCK TRAY CONTINUE POH AT 3.35 BPM IN.2.7 BPM OUT MW IN AND OUT 8.67 PPG. LOSSES AVERAGING 18 BPH AT THIS PUMP RATE PAINT TD FLAG AT 9620'. CONTINUE POH,PAINT WINDOW FLAG AT 6720'. POH TO SURFACE. 10/20/2012 00:00 - 02:00 2.00 DRILL P PROD1 POH WITH DRILLING BHA TO SURFACE. JOG BACK DOWN TO 200'. FLOW CHECK. PJSM ON LAYING DOWN LINER. FLOW CHECK GOOD. CLOSE AND POWER OFF EDC. POH TO SURFACE. Printed 11/5/2012 10:34:38AM North America -ALASKA- BP Page 29 of 29 0•eration Summary Report eller.,za!.,i,/V.4* „�,,,,ie Fi1 ` i,,.,.i i,✓ri...,u;r/,,.nao-_Sdv�"; _, Common Well Name: 18-27 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:9/24/2012 End Date X3-01299(2,713,188.76) X3-01299-C:DRILL Project:Prudhoe Bay Site: PB DS 18 Rig Name/No.: NORDIC 1 Spud Date/Time: 10/11/2012 12:00:00AM Rig Release: 10/26/2012 Rig Contractor: NORDIC CALISTA UWI: Active Datum: 18-27E New RKB @53.70ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 02:00 - 03:00 1.00 DRILL P PROD1 POP OFF WITH INJECTOR. LD BHA. BIT GRADE: 1-1-BU-G-X-I-WT-TD. (BIT DRILLED TOTAL OF 3810'AND MILLED TWO BILLETS) -FILL HOLE,HOLE TAKING—3 BPH -LAY DOWN BAKER INTEQ QUICK CONNECTS, MU PH6 FOR PUMPING SLACK Printed 11/5/2012 10:34:37AM , ,,Page 1 of North America-ALASKA- BP Operation Summary Report - Common Well Name: 18-27 AFE No Event Type: COM-ONSHORE(CON) Start Date. 10/6/2012 End Date: X3-01299(1,956,811.00) Project:Prudhoe Bay Site:PB DS 18 Rig Name/No.:NORDIC 1 Spud Date/Time:10/11/2012 12:00:00AM Rig Release: 10/26/2012 Rig Contractor:NORDIC CALISTA UWI: Active Datum: 18-27E New RKB @53.70ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 10/20/2012 03:00 - 04:00 1.00 CASING P RUNPRD STAB ON WITH INJECTOR,PRESSURE TEST QUICK TEST SUB. CIRCULATE FRESH WATER THROUGH COIL. PUMP SLACK FORWARD IN PREPARATION FOR CEMENT JOB. 178'OF E-LINE RETRIEVED. POP OFF WITH INJECTOR. FILL ACROSS TOP,LOSSES AT 3 BPH. 04:00 - 04:45 0.75 CASING P RUNPRD MOBILIZE BAKER TOOLS TO RIG FLOOR. CHANGE OUT PACKOFFS ON LUBRICATOR. 04:45 - 06:00 1.25 CASING P RUNPRD CUT COIL CONNECTOR AND RE-HEAD WITH BTT COIL CONNECTOR. 06:00 - 06:30 0.50 CASING P RUNPRD CREW CHANGE 06:30 - 06:50 0.33 CASING P RUNPRD PJSM TO CONTINUE OPS 06:50 - 08:20 1.50 CASING P RUNPRD PU INJECTOR AND STAB ON WELL TO PT PACK OFF AND PUMP#2(PUMP#2 HAD NEW VALVE SEATS INSTALLED) SPERETSSSURED UP TO 4500 PSI TO SEAT VALVE A BLED OFF AND 08:20 - 09:10 0.83 CASING P RUNPRD LOAD 3/4"BALL TO REEL AND JET STACK FOR FUNCTION TEST MUD AT MM,SHUT DOWN AND CHECK WELL FOR FLOW 09:10 - 09:30 0.33 CASING P RUNPRD GOOD NO FLOW, PU INJECTOR AND CHECK FOR DRIFT BALL BALL RECOVERED FROM NOZZLE,SET INJECTOR ON ITS LEG PREP TO FUNCTION TEST BOPE CLOSE SWAB AND LOWER TEST JOINT ACROSS STACK 09:30 - 09:35 0.08 CASING P RUNPRD FUNCTION TEST BOPE FROM OPS CAB PANEL 09:35 - 10:00 0.42 CASING P RUNPRD FUNCTION TEST COMPLETED,INSTALL TREE CAP AND PT TO OPEN SWAB VALVE GOOD LOW&HIGH PT,OPEN SWAB VALVE TO A CLOSED CHOKE AND CHECK FOR PRESSURE NO PRESSURE. PUMP DOWN KILL LINE TO FILL HOLE WELL TOOK 1 BBL,OPEN CHOKE TO CHECK WELL FOR FLOW 10:00 - 10:20 0.33 CASING P RUNPRD GOOD NO FLOW CHECK, REMOVE NIGHT CAP AND CHECK FLUID LEVEL MUD IS IN THE STACK HOLD PJSM TO MU LINER AND WALK THROUGH LINER SUMMARY WITH TOOL PUSHER,DRILLER AND BTT HAND 10:20 - 10:45 0.42 CASING P RUNPRD RU FARR TONGS TO RUN LINER FILL HOLE 10:45 - 11:30 0.75 CASING P RUNPRD MU LINER AS PER WELL PLAN AND LINER SUMMARY DRIFTING FIRST 5 JOINTS OF EACH TUBING SIZE 11:30 - 13:00 1.50 CASING P RUNPRD 8 JTS RAN,CHECK FLUID LEVEL WELL TOOK LESS THAN 1 BBL TO FILL 13:00 - 13:15 0.25 CASING P RUNPRD 1000OF PIPE RAN,FILL PIPE Printed 11/20/2012 1 08.39PM North America -ALASKA- BP Page 2 of 9 Operation Summary Report Common Well Name: 18-27 AFE No Event Type: COM-ONSHORE(CON) Start Date: 10/6/2012 End Date: `X3-01299(1,956,811 00) Project:Prudhoe Bay Site:PB DS 18 Rig Name/No.:NORDIC 1 Spud Date/Time: 10/11/2012 12:00:00AM Rig Release: 10/26/2012 Rig Contractor:NORDIC CALISTA UWI: Active Datum: 18-27E New RKB @53.70ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 13:15 - 14:00 0.75 CASING P RUNPRD CONTINUE RUNNING LINER *****13:30 CALLED STATE TO GIVE UPDATE FOR TESTING BOPE***** 14:00 - 14:45 0.75 CASING P RUNPRD 50 JTS OF 2-7/8"RAN,SWAP TO 3-1/4" 14:45 - 15:00 0.25 CASING P RUNPRD FILL HOLE AND PIPE 60 JTS RAN HOLE IS FULL, PIPE DISPLACEMENT IS _ABOUT EQUAL TO FLUID LOSS RATE 15:00 - 15:10 0.17 CASING P RUNPRD CONTINUE RUNNING LINER 15:10 - 16:35 1.42 CASING P RUNPRD JEFF JONES WITH THE STATE CALLED BACK AND WOULD LIKE TO WITNESS TEST 16:35 - 17:00 0.42 CASING P RUNPRD FILL PIPE AT JT 90 JTS RAN 17:00 - 21:45 4.75 CASING P RUNPRD CONTINUE MU LINER PER RUNNING PLAN. LINER ASSEMBLY IN HOLE:INDEX GUIDE SHOE,FLOAT COLLAR,1 JT OF 2-7/8",FLOAT COLLAR,PUP,LATCH COLLAR,PUP,STAGE COLLAR,549 JTS 2-7/8"LINER,XO,66 JTS 3-1/4"LINER,XO, PUP,1 JT 3-1/2"LINER,PUP, DEPLOYMENT SLEEVE. MU LINER RUNNING TOOLS. STAB ON WITH INJECTOR. PRESSURE TEST QUICK TEST SUB. 21:45 - 00:00 2.25 CASING P RUNPRD RIH WITH LINER ASSEMBLY. INITIAL LOSSES 7 BPH, INCREASED TO 16 BPH WHILE TRIPPING IN. AT WINDOW,PUW 38K,SOW 17K. FLAG ON TARGET DEPTH. CONTINUE TO RIH IN OPEN HOLE. 10/21/2012 00:00 - 04:30 4.50 ` CASING P RUNPRD RUN INTO OPEN HOLE WITH LINER ASSEMBLY. WORK STRING THROUGH TIGHT AREAS AT 11,995',12,295',12,332',12,505', 12,830',AND 12,891'. TAGGING CONSISTENTLY AT 12,911';CORRELATES TO SHALE LEDGE ON LOG. -LOSS RATE INCREASED TO 23 BPH WITH ASSEMBLY GETTING CLOSER TO LOSS ZONE AT 12,592'. RATE DID NOT INCREASE PAST THE LOSS ZONE. -WORK STRING IN ATTEMPT TO RE-ORIENT INDEXING GUIDE SHOE,VARY RUNNING SPEEDS TO WORK THROUGH TO BOTTOM. DOWN ON PUMPS AND LET FORMATION RELAX. ATTEMPT TO MOVE BACK DOWN AND ABLE TO RIH FROM 12,928'TO 13,027' WITH LITTLE WORK. ALL PICK UPS WERE GOOD. -HARD TAG AND VERY HARD TO WORK TO GET BY 13,027'. -DOWN ON PUMPS AND LET RELAX. MAKE ATTEMPT TO MOVE DOWN,NO FOOTAGE. PICK UP 100'WITH 1 BPM RATE. PICK UP CLEAN WITH 39K PUW. RUN BACK DOWN. CANNOT MOVE PAST 13,028'. RELAX FORMATION AGAIN WITH NO MOVEMENT. PICK UP CLEAN. -CONSULT WITH ODE FOR PLAN FORWARD. Printed 11/20/2012 1.08:39PM North America-ALASKA- BP Pane 3 of•:' • Operation Summary Report Common Well Name: 18-27 AFE No Event Type. COM-ONSHORE(CON) Start Date: 10/6/2012 End Date. X3-01299(1,956,811 00) Project:Prudhoe Bay Site:PB DS 18 Rig Name/No.: NORDIC 1 Spud Date/Time. 10/11/2012 12 00 00AM Rig Release: 10/26/2012 Rig Contractor:NORDIC CALISTA UWI: Active Datum: 18-27E New RKB©53.70ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 04:30 - 07:10 2.67 CASING P RUNPRD CONTINUE TO STACK DOWN AND DOWN ON PUMPS IN ATTEMPT TO LET FORMATION RELAX AND POP GUIDE SHOE THROUGH. WORK WITH ENGINEER ON TROUBLESHOOTING. PRESSURE DOWN BACK SIDE IN ATTEMPT TO MOVE PIPE, NO-GO. PUMP 40 BBL PILL KCL AROUND IN ATTEMPT TO CLEAN WELLBORE. 07:10 - 07:29 0.32 CASING P RUNPRD KCL AT THE SHOE,MAX PRESSURE WHILE PUMPING IS LIMITED TO 2000 PSI. IN RATE= 1.89 BPM/OUT RATE=1.44 BPM AT 1967 PSI CIRC KCL AROUND AND RECIPROCATE COIL TO SEE IF WE CAN GET SOMETHING TO MOVE. 07:29 - 08:00 0.52 CASING P RUNPRD ALL KCL IS OUT AND WE GOT A 5K JUMP IN WT,TRY RUNNING DOWN, NO GO CALL DRGL SUPT TO SUGGEST PUMPING 20 BBLS OF MINERAL OIL WE HAVE ON LOCATION TO PT CMT LINE, HE IS OK WITH IT.CALL ODE TO DISCUSS PUMPING MINERAL OIL AND GETTING APPROVAL WORK PIPE WHILE WAITING ON APPROVALS 08:00 - 08:15 0.25 CASING k P _ RUNPRD MOVE TRUCKS TO PREP FOR PUMPING MINERAL OIL 08:15 - 08:20 0.08 CASING P RUNPRD ODE HAS VERBAL APPROVAL FROM WTL TO PUMP 20 BBLS OF MINERAL OIL 20 BBLS OF MINERAL OIL WILL REDUCE THE HYDROSTATIC PRESSURE BY—171PSI CURRENT MUD WT=8.6 PPG PT RIVER FORMATION EMW=7.6 PPG OVER BALANCE=414 PSI-171 =242 PSI OVER BALANCE WITH 20 BBLS OF MINERAL OIL IN THE VERTICAL SECTION OF THE WELL IVISHAK FORMATION EMW=7.2 PPG OVER BALANCE=641 PSI-171 =470 PSI OVER BALANCE WITH 20 BBLS OF MINERAL OIL IN THE VERTICAL SECTION OF THE WELL 08:20 - 09:35 1.25 CASING P RUNPRD ONLINE WITH MINERAL OIL 19 BBLS PUMPED OFF TRUCK,ROUND TRIP TRUCK FOR CMT LINE PT 09:35 - 09:45 0.17 CASING P RUNPRD MINERAL OIL AT THE SHOE, PUMP 15 BBLS OUT AND ALOOW TO SOAK A FEW MINUTES THE WORK PIPE 09:45 - 09:55 0.17 CASING P RUNPRD 15 BBLS OUT,NO INCREASE IN LOSSES WITH MINERAL OIL.ALLOW TO SOAK A FEW MINUTES THEN TRY WORKING PIPE MINERAL OIL IS WORKING 09:55 - 10:55 1.00 CASING P RUNPRD LINER IS ON BOTTOM,CIRC MINERAL OIL OUT THEN RELEASE FROM LINER RU CMT EQUIPMENT 10:55 - 11:10 0.25 CASING P RUNPRD MINERAL OIL AT SURFACE,DUMP TO CUTTINGS BOX 11:10 - 11:40 0.50 CASING P RUNPRD PICK UP TO BALL DROP POSITION AND DROP A 5/8"BALL TO RELEASE FROM LINER 11:40 - 11:50 0.17 CASING P RUNPRD BALL ON SEAT,PRESSURE UP TO SHEAR AND RELEASE FROM LINER 11:50 - 11:55 0.08 CASING P RUNPRD TOOL SHEARED AT 4100 PSI PU TO CONFIRM WE ARE RELEASED,FREE AT 38K UP INT AT 13,177.5' SET DOWN TO-13.3K AT 13,186.9' Printed 11/20/2012 1:08:39PM • North America -ALASKA- BP Page 4 of 9 u Operation Summary Report Common Well Name: 18-27 AFE No Event Type. COM-ONSHORE(CON) Start Date. 10/6/2012 End Date: X3-01299(1,956,811 00) Project:Prudhoe Bay Site:PB DS 18 Rig Name/No.:NORDIC 1 Spud Date/Time: 10/11/2012 12:00:00AM Rig Release: 10/26/2012 Rig Contractor:NORDIC CALISTA UWI: Active Datum: 18-27E New RKB @53.70ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 11:55 - 13:40 1.75 CASING P RUNPRD SWAP WELL TO KCL 13:40 - 14:00 0.33 CASING P RUNPRD GETTING DIRTY KCL BACK TO SURFACE AND THE SLB CMT LINE IS TESTED TO 6000 PSI 14:00 - 15:00 1.00 CASING P RUNPRD KEEPING FLUID, PITS ALMOST READY TO START THE CMT JOB 15:00 - 15:20 0.33 CASING P RUNPRD HOLD PJSM TO PUMP CMT 15:20 - 16:00 0.67 CASING P RUNPRD BATCH UP 42 BBLS OF 1508 PPG CLASS G CMT 16:00 - 17:45 1.75 CASING P RUNPRD CMT TO WEIGHT AT 16:00 START BIO 50 Bc 4:38 THICKENING TIME START CMT JOB 16:05 SWAP TO BIOZAN WITH RIG PUMP 14;0111' 16:09 4 BBLS AWAY SHUT DOWN RIG PUMP 16:13 ONLINE WITH CMT PUMP WITH KCL 16:16 5 BBLS PUMPED SWAP TO CMT 16:17 ZERO IN MM AT 14 PPG CMT 16:35 36.5 BBLS AWAY CLEAN OUT CMT LINE 16:40 ONLINE WITH BIOZAN CHASING CMT 16:44 CAUGHT CMT AT 46 BBLS 2.36 BPM IN 2.07 BPM OUT 16:47 CMT IS 1 BBL AWAY FROM SELRT REDUCE RATE 16:48 INCREASE RATE TO CATCH CMT 16:57 82 BBLS AWAY ZERO OUT MM AND TAKE RETURNS TO PIT 1 START VOL=83 BBLS 17:02 90.8 BBLS AWAY SHUT DOWN PUMP, PU TO RELEASE THE PEE WEE DART 17:06 LAUNCH PEE WEE DART,LAND AND HOLD PRESSURE FOR 30 SEC 17:07 PU AND LOOK FOR BLEED OFF THEN STOP TO SIDE EXHAUST 17:10 SIDE EXHAUST 5 BBLS 17:13 STACK BACK DOWN&CLOSE BAKER CHOKE 17:14 SHEAR LWP,SHEARED AT 3900 PSI,IN RATE=2.12 OUT RATE=1.63 BPM AT 2311 PSI 17:18 REDUCE RATE TO REDUCE LOSSES RATES=1.48 BPM IN 1.25 OUT 17:24 LOSSES INCREASING BUT COIL PRESSURE IS CLIMBING 2238 PSI AT 1.53 IN 0.96 OUT 17:28 PLUG BUMPED AT DISPLACEMENT 24.8 BBLS WITH 1000 PSI 17:28 OUT MM=28 BBLS BEHIND PIPE,PIT STRAP SHOWS 27 BBLS BEHIND PIPE VOLUMES ARE LESS 5 BBLS FOR SIDE EXHAUST 17:38 GOOD FLOAT AND NO FLOW CHECK, CLOSE BAKER CHOKE AND PRESSURE UP TO 700 PSI 17:39 PU TIL PRESSURE DROP IS SEEN THEN STOP 17:40 ONLINE AT 1.0 BPM RETURNS ARE 1:1 17:45 - 18:20 0.58 CASING P RUNPRD POOH MAINTAINING 0.5 BPM RETURN RATE 18:20 - 19:45 1.42 CASING P RUNPRD JEFF JONES WITH THE STATE HAS WAIVED WITNESSING THE TEST. POH TO SURFACE. PJSM WHILE POH. FLOW CHECK AT SURFACE. Printed 11/20/2012 1:08:39PM • North America -ALASKA- BP , Page 5 of 9 .� ; Operation Summary Report � � � Common Well Name:18-27 AFE No Event Type:COM-ONSHORE(CON) Start Date: 10/6/2012 End Date X3-01299(1,956,811.00) Project: Prudhoe Bay Site: PB DS 18 Rig Name/No.: NORDIC 1 Spud Date/Time: 10/11/2012 12:00:00AM Rig Release: 10/26/2012 Rig Contractor:NORDIC CALISTA UWI: Active Datum: 18-27E New RKB @53.70ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 19:45 - 20:30 0.75 CASING P RUNPRD POP OFF WITH INJECTOR. LD BHA. RUNNING TOOL IN GOOD SHAPE,5/8"BALL RETRIEVED. 20:30 - 20:45 0.25 CASING P RUNPRD CLOSE BARRIERS TO WELL-SSV AND SWAB VALVE. CONDUCT LEAK TIGHT TEST PER WELL PLAN CRITERIA. GOOD TEST. 20:45 - 00:00 3.25 BOPSUR P WHDTRE OPEN RAM DOORS AND INSPECT BOP RAMS AND SEALS. MONITOR PRESSURE BETWEEN MASTER&SSV REPLACED BLINDS AND TWO DOOR SEALS. TEST FULL OPENING SAFETY VALVES. CLOSE DOORS,CONDUCT BODY TEST ON BOP. -AOGCC REP JEFF JONES WAIVED WITNESS OF TEST. TEST WITNESSED BY TOURPUSHER AND WSL. 10/22/2012 00:00 - 07:15 7.25 BOPSUR P WHDTRE FUNCTION TEST BOP RAMS FROM DRILLERS CONSOLE AND CTD OPS CONSOLE. CONDUCT ACCUMULATOR DRAWDOWN TEST: 18 SEC TO PRESSURE TO 200 PSI,1 MIN 30 SECONDS FOR FULL RECOVERY. TEST BOP PER TESTING PROCEDURE. PRESSURE TEST PACKOFFS AND INNER REEL VALVE. -AOGCC REP JEFF JONES WAIVED WITNESS OF TEST. TEST WITNESSED BY TOURPUSHER AND WSL. 07:15 - 07:30 0.25 BOPSUR P WHDTRE HOLD PJSM TO TEST RAMS WITH MANUAL LOCKS 07:30 - 10:30 3.00 BOPSUR P WHDTRE RUN COIL DOWN TO SWAB VALVE AND PU 0.5' TEST MANUAL LOCKS ON LOWER COMBI RAMS,2-3/8"X 3-1/2"VBRS AND UPPER COMBI RAMS. GOOD TESTS. 10:30 - 11:00 0.50 BOPSUR P WHDTRE OPEN UP WELL TOA CLOSED CHOKE,NO PRESSURE OPEN CHOKE AND PUMP THROUGH KILL LINE TO ENSURE HOLE IS FULL HOLE IS FULL NO LOSSES 11:00 - 11:15 0.25 CASING P RUNPRD HOLD PJSM TO MU 4-1/2"CLEAN OUT BHA HOLE IS STILL FULL NO LOSSES 11:15 - 11:35 0.33 CASING P RUNPRD LOAD BTT EQUIPMENT ON THE RIG 11:35 - 12:25 0.83 CASING P RUNPRD PU INJECTOR,CUT OFF 5-PITCH CTC AND MU 2-3/8 REG CTC.SLIP CTC OVER ELINE AND I DRIFT CTC WITH 3/4"DRIFT BALL TO ENSURE IT WILL PASS,BALL DRIFTED.MU CTC 12:25 - 13:15 0.83 CASING P RUNPRD PT CTC,GOOD TEST,MU MILLING BHA 13:15 - 13:40 0.42 CASING P RUNPRD TEST QTS 13:40 - 14:30 0.83 CASING P RUNPRD RIH 14:30 - 15:35 1.08 CASING P RUNPRD GETTING CMT IN OUR RETURNS 1 15:35 - 16:00 0.42 CASING P RUNPRD TAG TOP OF LINER ON DEPTH AT 9620.5'-0.5' FOR NORMAL CORRECTION ON THIS WELL 16:00 - 16:30 0.50 CASING P RUNPRD REDUCE POOH SPEED AND SLOW DOWN PUMP RATE,CUTINGS BOX IS GETTING FULL. CALLED DISPATCH TO FIND OUT WHERE OUR DIRTY TRUCK IS AND THEY FAILED TO LET US KNOW THE TRUCK NEEDED REPAIRS Printed 11/20/2012 1:08:39PM North America -ALASKA- BP Page 6 of Operation Summary Report Common Well Name: 18-27 AFE No Event Type: COM-ONSHORE(CON) Start Date: 10/6/2012 End Date: 1X3-01299(1,956,811.00) Project:Prudhoe Bay Site: PB DS 18 Rig Name/No.: NORDIC 1 Spud Date/Time: 10/11/2012 12:00:00AM Rig Release: 10/26/2012 Rig Contractor:NORDIC CALISTA UWI: Active Datum: 18-27E New RKB @53.70ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 16:30 - 19:00 2.50 CASING P RUNPRD CONTINUE POOH TAKING RETURNS TO PIT 1. PJSM ON LAYING DOWN BHA. CONDUCT FLOW CHECK AT SURFACE. NO FLOW. PULL TO TAG UP. POP OFF. 19:00 - 19:30 0.50 CASING P RUNPRD LD BHA WITH NO ISSUES. MILL IN GAUGE. MAKE UP NOZZLE ASSEMBLY. 19:30 - 20:45 1.25 BOPSUR P WHDTRE MU TO LUBRICATOR, RIH PAST SWAB AND 'JET STACK OF CEMENT DEBRIS. FLUSH SURFACE LINES. REMOVE LOCK FROM L2-21. CONDUCT CREW CHANGEOUT. POP OFF WITH INJECTOR. 20:45 - 21:15 0.50 EVAL P OTHCMP CONDUCT WELL STATUS MEETING WITH NEW CREW. PJSM ON BRINGING UP LOGGING TOOLS AND MAKE UP OF CLEANOUT AND LOGGING BHA. 21:15 - 00:00 2.75 EVAL P OTHCMP MOBILIZE TOOLS TO FLOOR. MU CLEANOUT AND LOGGING BHA. CONDUCT KICK WHILE MAKING UP BHA DRILL. CREW RESPONSE TIME 1 MIN 50 SEC. CONDUCT AAR. LAY DOWN SAFETY JOINT. MAKE UP HEAD PIN AND PUMP THROUGH STRING. NO ISSUES. CONTINUE TO MAKE UP ASSEMBLY. 10/23/2012 00:00 - 02:15 2.25 EVAL P OTHCMP COMPLETE MAKE UP OF MCNL LOGGING AND 2.30"CLEANOUT BHA. 02:15 - 03:45 1.50 EVAL P OTHCMP RIH WITH LOGGING AND CLEANOUT ASSEMBLY. RIH TO 5000',CONDUCT SHALLOW HOLE CORRELATION. CONTINUE RUNNING IN HOLE TO 8500'. 03:45 - 06:30 2.75 EVAL P OTHCMP LOG DOWN AT 30 FPM,.75 BPM. HARD TAG AND MOTOR WORK AT 9900'. WORK SECTION SEVERAL TIMES,CONTINUE LOGGING DOWN. 06:30 - 08:00 1.50 EVAL P OTHCMP TAG PBTD. PU AND CONFIRM GOOD TAG START PERF PILL 08:00 - 09:05 1.08 EVAL P OTHCMP POOH LOGGING UP 09:05 - 09:35 0.50 EVAL P OTHCMP STOP AT 9520'AND PAINT EOP FLAG(EOP= 5640') 09:35 - 09:45 0.17 EVAL P OTHCMP END OF LOGGING INTERVAL,STOP TO FLOW CHECK WELL 09:45 - 10:50 1.08 EVAL P OTHCMP GOOD NO-FLOW CHECK POOH 10:50 - 11:10 0.33 EVAL P OTHCMP FLOW CHECK WELL AND HOLD PJSM TO PULL LOGGING BHA 11:10 - 17:00 5.83 EVAL P OTHCMP GOOD NO FLOW CHECK, PU INJECTOR AND SET ON LEGS DROP 1/2"BALL TO OPEN CIRC SUB PULL LINER CLEAN OUT/LOGGING BHA. STAND BACK WORK STRING. RETRIEVE 1/2" BALL. 17:00 - 18:00 1.00 PERFOB P OTHCMP LOAD PERFORATION GUNS INTO PIPE SHED, CLEAR AND CLEAN RIG FLOOR. 18:00 - 19:30 1.50 PERFOB P OTHCMP WAIT ON CONFIRMATION OF MCNL LOG AND GEOLOGIST PICK FOR PERFORATION INTERVAL. ADJUST DRAWWORKS BREAK WHILE WAITING. MCNL DATA GOOD,GEO PICK CONFIRMS SHOT INTERVAL. 19:30 - 20:00 0.50 PERFOB P OTHCMP PJSM ON PICKING UP TOOLS AND MAKING UP PEFORATION BHA. MOBILIZE TOOLS TO RIG FLOOR. Printed 11/20/2012 1:08:39PM North America -ALASKA- BP Pa•e 7 of Operation Summary Report Common Well Name: 18-27 AFE No Event Type.COM-ONSHORE(CON) Start Date: 10/6/2012 End Date X3-01299(1,956,811.00) Project:Prudhoe Bay Site:PB DS 18 Rig Name/No.: NORDIC 1 Spud Date/Time: 10/11/2012 12.00.00AM Rig Release: 10/26/2012 Rig Contractor:NORDIC CALISTA UWI: Active Datum: 18-27E New RKB @53.70ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 20:00 - 00:00 4.00 PERFOB P OTHCMP MAKE UP PERFORATION BHA PER RUNNING ORDER. CONTINUE MAKE UP WITH 1-1/4" CSH WORK STRING. 10/24/2012 00:00 - 01:30 1.50 PERFOB P OTHCMP MU PERFORATION BHA. STAB ON, PRESSURE TEST QUICK TEST SUB. 01:30 - 05:00 3.50 PERFOB P OTHCMP RIH WITH PERF BHA. CORRECT LINER TOP FLAG TO MCNL DEPTH WITH 6'CORRECTION. ENTER INTO LINER,DOWN ON PUMPS,AND CONTINUE TO RIH WITH PERF BHA. TAG PBTD AT 13,152'. PICK UP, RE-TAG AT 13,151'. PICK UP TO NEUTRAL AND SET DEPTH ON CTDS. 1 05:00 - 06:00 1.00 PERFOB P OTHCMP CONDUCT TRIAL RUN WITH PUMPS TO MARK RATES. RUN THROUGH PUMP SEQUENCE FOR FIRING. SLOWLY PICK UP TO 13,130' AND FIRE GUNS. POSITIVE INDICATION GUNS FIRED. 06:00 - 07:30 1.50 PERFOB P .OTHCMP POH WITH PERF GUNS HOLDING 200-300 PSI BACK PRESSURE PULL TO THE TOP OF THE LINER. 07:30 - 08:00 0.50 PERFOB - P OTHCMP MONITOR WELL-STATIC LOSSES 3 BPH 08:00 - 09:30 1.50 PERFOB P OTHCMP POH 09:30 - 10:00 0.50 PERFOB P OTHCMP fMONITOR WELL/SET BACK INJECTOR 10:00 - 12:00 2.00 PERFOB P OTHCMP R/U STAND BACK WORK STRING 12:00 - 16:30 4.50 PERFOB P OTHCMP PJMS ON LAYING DOWN PERF GUNS 16:30 - 18:00 1.50 PERFOB P OTHCMP LD PERF GUNS. ALL SHOTS FIRED. CLEAR AND CLEAN RIG FLOOR. 18:00 - 18:45 0.75 TIEBAC P OTHCMP PREPARE EQUIPMENT TO RUN LINER. PJSM ON MAKING UP 3-1/2"LINER PROGRAM. 18:45 - 22:00 3.25 TIEBAC P OTHCMP MU 29 JTS 3-1/2"9.2#L-80 STL TUBING WITH SEAL AND LOCATOR SUB ASSEMBLY. MU PUP,X-NIPPLE AND DEPLOYMENT SLEEVE ASSEMBLY. MU RUNNING ASSEMBLY. POP ON,PT QUICK TEST SUB. 22:00 - 00:00 2.00 TIEBAC P OTHCMP RIH WITH LINER ASSEMBLY. NO ISSUES RUNNING IN. SLOW RUNNING SPEED AT 9000'. PUW AT 9400'40K. PUMP AT.3 BPM, 200 PSI WHILE SLOWLY RUNNING DOWN TO TOP OF DEPLOYMENT SLEEVE. SAW SLACK OFF WEIGHT AND PRESSURE RISE AT 9620'. STACK DOWN WITH 10K, LAND OUT AGAINST LOCATOR SUB AT 9624'. PRESSURE UP, RELEASE FROM LINER WITH GRAPPLE RUNNING TOOL. PUW 33K. TOL AT 8691'. 10/25/2012 00:00 - 01:45 1.75 TIEBAC P OTHCMP PICK UP 20', DISPLACE TO NEW KCL ALL THE WAY AROUND. WITH KCL ABOVE, POH WHILE COMPLYING WITH FLUID MANAGEMENT POLICY. 01:45 - 03:00 1.25 TIEBAC P OTHCMP FLOW CHECK. PJSM ON LAYING DOWN CURRENT BHA AND MU LINER TOP PACKER ASSEMBLY AND NEW RUNNING BHA.. 03:00 - 04:00 1.00 TIEBAC P OTHCMP LD LINER RUNNING BHA. MU LINER TOP PACKER RUNNING BHA. MU LINER TOP PACKER TO RUNNING TOOL. POP ON WITH INJECTOR. PT QUICK TEST SUB. Printed 11/20/2012 1:08.39PM 4p. Tr'North America-ALASKA- BP • Page 8 of 9 7WW .‘: . Operation Summary Report Common Well Name: 18-27 AFE No Event Type:COM-ONSHORE(CON) Start Date: 10/6/2012 End Date: X3-01299(1,956,811.00) Project:Prudhoe Bay Site: PB DS 18 Rig Name/No.:NORDIC 1 Spud Date/Time: 10/11/2012 12:00:00AM Rig Release: 10/26/2012 Rig Contractor:NORDIC CALISTA UWI: Active Datum: 18-27E New RKB @53.70ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 04:00 - 06:30 2.50 TIEBAC P OTHCMP .RIH WITH 45 KB LINER TOP PACKER ASSEMBLY. RUN DOWN TO 8692'CONFIRM WITH PUMP PRESSURE AND WT TOP OF LINER. 06:30 - 07:30 1.00 TIEBAC P OTHCMP SET DOWN AND CONFIRM DEPTH-PICK UP AND PUMP DOWN 5/8"SETTING BALL-SET PACKER ON DEPTH AND PERSSURE UP TO 2000 PSI AND SET AT 8680. 07:30 - 08:00 0.50 TIEBAC P OTHCMP BLEED PRESSURE OFF COIL-PRESSURE TEST TOP OF PACKER 2400 PSI(GOOD TEST)PRESSURE UP 3500 PSI TO RELEASE SETTING TOOL-PULL TO STRING WT COMFIRM RELEASE. 08:00 - 10:00 2.00 TIEBAC P OTHCMP POH WITH PACKER SETTING TOOL-FLOW CHECK WELL 10:00 - 11:30 1.50 TIEBAC P OTHCMP SET BACK INJECTOR-LAY DOWN BHA- CLEAR RIG FLOOR AND PIPE SHED OF TOOLS 11:30 - 13:00 1.50 WHSUR P POST MAKE UP FREEZE PROTECT NOZZLE BHA- ' RIH TO 2500'PUMP FREEZE PROTECT 13:00 - 14:15 1.25 WHSUR P POST GET FREEZE PROTECT AROUND AND PICK UP HOLE SLOWLY. PULL TO SURFACE. FREEZE PROTECT ACROSS TREE. FLOW CHECK WELL. POH, POP OFF AND LD BHA. STAND INJECTOR TO SIDE. 14:15 - 16:00 1.75 WHSUR P POST GREASE TREE VALVES,SET BPV WITH NO ISSUES. CLOSE TREE VALVES,CONDUCT - LEAK TIGHT TEST FOR BARRIER INTEGRITY TO SHUT IN THE WELL. MONITOR WITH GAUGE BETWEEN SSV AND SWAB VALVE. 16:00 - 19:00 3.00 RIGD P POST RU NITROGEN CREW,PRESSURE TEST LINES. BLOW DOWN REEL. RD NITROGEN CREW. 19:00 - 00:00 5.00 RIGD P POST INSTALL GRAPPLE AND PULL TEST. PULL REEL BACK TO REEL HOUSE AND SECURE FOR LOWERING. LOWER REEL. PICK UP REPLACEMENT REEL,CALIBRATE WIEGHT INDICATOR IN REEL HOUSE. 10/26/2012 00:00 - 02:30 2.50 RIGD P POST CALIBRATE WEIGHT INDICATOR IN REEL HOUSE. LIFT REEL,SECURE WITH DRIVE PINS. SIMOPS: EMPTY BOP STACK OF FLUIDS. LINE OUT EQUIPMENT TO OPEN DOORS AND INSPECT BOP SEALS AND RAMS. USE TRUCKING TO MOVE SUPPORT EQUIPMENT OFF OF PAD AND OVER TO DS 6. -CALIBRATION UNSUCCESSFUL; THIRD-PARTY COMPUTER EQUIPMENT DID NOT ULTIMATELY ACCEPT THE LOAD DATA. NORDIC TP TO CONTACT MANUFACTURER. WHILE CLEANING PITS 02:30 - 06:00 3.50 RIGD P POST INSPECT AND CHANGE OUT ELASTOMERS ON INJECTOR CHAINS. OPEN BOP DOORS AND INSPECT SEALS AND RAMS. -CALLED STATE AOGCC REP TO GIVE 24-HOUR NOTICE FOR UPCOMING BOP TEST AT 0530 HRS Printed 11/20/2012 1:08:39PM .: North America-ALASKA- BP Page 9 of 9 Operation Summary Report Common Well Name: 18-27 AFE No Event Type:COM-ONSHORE(CON) Start Date: 10/6/2012 End Date: X3-01299(1,956,811.00) Project:Prudhoe Bay Site: PB DS 18 Rig Name/No.: NORDIC 1 Spud Date/Time: 10/11/2012 12:00:00AM Rig Release: 10/26/2012 Rig Contractor:NORDIC CALISTA UWI: Active Datum: 18-27E New RKB @53.70ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 06:00 - 08:00 2.00 RIGD P POST 1NIPPLE DOWN BOPE/PRESSURE TEST TREE CAP 250/4000 PSI. DRILLER AND TOOLPUSHER MAKE ROUTE DRIVE FROM • DS-18 TO DS-6. -RELEASE RIG FROM DS 18-27E/NOTIFIED BY SUPERINTENDENT DOYON 25 DRILL- SIMULATE SHUTTING DOWN OPERATIONS AND ASSIST IF NEEDED Printed 11/20/2012 1:08:39PM A ,-,O A ._._,ASKA SEAN PARNELL, GOVERNOR ALASKA OIL AND GAS 333 W.7th AVENUE,SUITE 100 CONSERVATION COMMISSION ANCHORAGE,ALASKA 99501-3539 PHONE (907)279-1433 FAX (907)276-7542 John McMullen Engineering Team Leader BP Exploration (Alaska), Inc. P.O. Box 196612 Anchorage, AK 99519-6612 Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, PBU 18-27E BP Exploration (Alaska), Inc. Permit No: 212-131 Surface Location: 893' FNL, 236' FEL, SEC. 24, Ti1 N, R14E, UM Bottomhole Location: 3065' FSL, 4747' FEL, SEC. 14, T11N, R14E, UM Dear Mr. McMullen: Enclosed is the approved application for permit to re-drill the above referenced development well. This permit to drill does not exempt you from obtaining additional permits or an approval required by law from other governmental agencies and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the Commission reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the Commission specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or a Commission order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. Sincerely, 9 Daniel T. Seamount, Jr. Commissioner S � DATED this3 L day of August, 2012. cc: Department of Fish 86 Game, Habitat Section w/o encl. (via e-mail) Department of Environmental Conservation w/o encl. (via e-mail) STATE OF ALASKA RECEIVED ALAS OIL AND GAS CONSERVATION COMM. .ON PERMIT TO DRILL AUG 2 2 2012 20 MC 25.005 la.Type of work• , lb.Proposed Well Class' ®Development Oil ❑Service-Winj ®Single Zone • lc. Specs y�f�l pl'tTI� pced for: 0 Drill ®Redrill 0 Stratigraphic Test ❑ Development Gas ❑Service-Supply 0 Multiple Zone 0 Coalbed Gas ❑Gas Hydrates ❑Re-Entry 0 Exploratory ❑Service-WAG 0 Service-Disp ❑Shale Gas 2. Operator Name. 5 Bond: ®Blanket 0 Single Well 11. Well Name and Number: BP Exploration (Alaska) Inc. Bond No. 6194193 ' PBU 18-27E • 3. Address: 6 Proposed Depth. 12 Field/Pool(s): P.O. Box 196612,Anchorage,Alaska 99519-6612 MD 13185' • TVD 8620'ss Prudhoe Bay/Prudhoe Bay • 4a Location of Well(Governmental Section): 7 Property Designation(Lease Number): Surface ADL 028307 • 893' FNL,236' FEL, Sec. 24,T11N, R14E, UM - Top of Productive Horizon: 8. Land Use Permit 13 Approximate Spud Date. 475' FSL, 3767' FEL, Sec. 13,T11N, R14E, UM September 10,2012 . Total Depth. 9.Acres in Property. 14 Distance to Nearest Property: 3065' FSL,4747' FEL, Sec. 14,T11N, R14E, UM 2560 • 27000' 4b Location of Well(State Base Plane Coordinates-NAD 27): 10 KB Elevation above MSL 53.7' • feet 15 Distance to Nearest Well Open Surface. x- 691522 • y-5960969 • Zone- ASP4 GL Elevation above MSL: 15.7' • feet to Same Pool: 1000' 16.Deviated Wells. Kickoff Depth. • 10300' feet 17.Maximum Anticipated Pressures in psig(see 20 AAC 25.035) Maximum Hole Angle. 92 degrees Downhole: 3294 Surface: 2414 18. Casing Program: Specifications Top-Setting Depth-Bottom Quantity of Cement,c.f.or sacks Hole Casing Weight Grade Coupling Length MD TVD MD TVD (including stage data) 4-1/4" 3-1/4"x2-718" 6.6#16.4# L-80 TC-II/STL 4515' 8670' 7952'ss 13185' 8620'ss 111 sx Class'G' 19. PRESENT WELL CONDITION SUMMARY(To be completed for Redrill and Re-entry Operations) Total Depth MD(ft) Total Depth TVD (ft): Plugs(measured): Effective Depth MD(ft). Effective Depth TVD(ft) Junk(measured): 12200' 8689' 11500' 12200' 8689' None Casing Length Size Cement Volume MD ND Conductor/Structural 110' 20" 2000#Coldset II 110' 110' Surface 3497' 13-3/8" 2706 cu ft CS III,460 ft Class'G' 3497' 3497' Intermediate 9069' 9-5/8" 2217 cu ft Class'G' 9069' 8259' Production Liner 998' 7" 398 cu ft Class'G' 8829'-9827' 8110'-8618' Liner 3588' 4-1/2" 832 cu ft Class'G' 8678'- 11641' 8011'-8669' Perforation Depth MD(ft)- 8710'-8750' (Put River Appraisal) Perforation Depth TVD(ft) 8033'-8059' 11641'- 12200' 8669'-8689' 20.Attachments' 0 Property Plat ®BOP Sketch ®Drilling Program 0 Time vs Depth Plot 0 Shallow Hazard Analysis ®Diverter Sketch ❑Seabed Report ®Drilling Fluid Program ®20 AAC 25.050 Requirements 21. Verbal Approval. Commission Representative: Date 22 I hereby certify that the foregiiiro true and c. rect. Contact Troy Jakabosky,564-4868 Printed Name John ,,n AI/ Title Engineering Team Leader Prepared By Name/Number 4io Signature .' Phone 564-4711 Date r//2../k., Joe Lastufka,564-4091 Commission Use Only Permit ToAPI Number. Permit proval Date. See cover letter for Number 2./ L j - t' 50-029-22321-05-00 y3)1 j other requirements Conditions of Approval: If box is checked,well may not be used to explore for,test,or produce coalbed methane,�thgas hydrates,or gas contained shales: Other 3,5-60' /S4- i36P -re Samples Req'd ❑Yes L�No Mud Log Req'd: ❑yds EfNo H2S Measures: ["Yes ❑ No Directional Survey Req'd Yes 0 No APPROVED BY THE COMMISSION F13/1) Date ,COMMISSIONER Form 10-401 Red 07/2009 This permit is valid for 24 months from the date of approval(20 AAC 25.005(g)) Submit In Duplicat ee•3c..l7_- 1,3ORiGfNA1� ��,� i� To: Alaska Oil & Gas Conservation Commission From: Troy Jakabosky 0 by CTD Engineer Date: August 20, 2012 Re: 18-27E PTD Request Approval is requested for a permit to drill a CTD sidetrack from well 18-27D. - CTD Sidetrack Summary Pre-CT Rig Work: The pre CTD work is planned to begin August 27, 2012. 1. W PPPOT-T to 5000psi 2. C Run Dummy Whipstock Drift down to-10,400 MD. 3. V PT tree (MV,SV,WV) Bleed wellhead pressures down to zero. 4. 0 Bleed production flow lines and GL lines down to zero and blind flange. 5. 0 Remove wellhouse, and level pad. 6. F Load and Kill -24 hrs prior to rig arrival 7. V Set TWC (CIW 4") -24 hrs prior to rig arrival i Rig Sidetrack Operations: (Scheduled to begin on September 10th, 2012 using Nordic Rig 1) ritk 1. MIRU 2. NU 7-1/16" CT Drilling BOPE and test i 3. Set 4-1/2" KB Packer Whipstock at 10,300 MD at 92 ROHS ( L.-i- 4. Mill 3.8" single st nir q window in the 4-1/2" liner at 10,300'. 5. Drill with 4.25" Bi-Center bit 1,015 ft(12°/100) in Zone 1A to a PBTD of 11,315' MD. ✓ z' 6. Set aluminum billet at 10,845. r' f> 7. KIO billet and drill lateral with 3.75" bit 2,340ft (12°/100) in Zone 1A to TD of 13,=111)._.1 A,,✓ 8. Run and cement 2-7/8"x 3-1/4" liner leaving TOL/TOC @9.600 ft with 23 BBLS cement. ‘ -(\s) 9. Run 3-1/4 tieback and LTP to 8670' MD. Test to 2400 psi. 10. Perform cleanout/MCNL log run with mill, motor. 11. Perforate well (-800' planned) 12. Freeze protect well to 2500' MD. 13. Set BPV. ND 7-1/16" BOPE stack. Freeze protect tree and PT tree cap to 3500 psi. 14. RDMO Post-Rig Work: 1. Pull BPV. 2. Set generic GLV's 3. Flowback and well test 1 Mud Program: • Well kill: 8.4 ppg seawater/ brine. • Milling/drilling: 8.6 ppg Geo-VIS for milling window and drilling (-640 psi overbalance Ivishak). • Milling/drilling: 8.6 ppg Geo-VIS for milling window and drilling (-776 psi overbalance Put River). Disposal: • All Class II drilling and completion fluids and all other Class II wastes will go to Grind & Inject at DS 4. • All Class I wastes will go to Pad 3 for disposal. Hole sizes: 4.25" 11,290' and— 13,185' and 3.75" /cy'zv /3/f3 Liner Program: Solid, cemented, and perforated completion. • 3-1/4 TCII x 2-7/8" STL liner, 10,700' and — 13185' md. • Planned 23 bbls of 15.8 class G cement will be used for liner cementing (assuming 4.25" hole size to 10,800 and 3.75" hole to TD and 20% excess in open hole). TOC planned at 9,600 MD. • 3-1/2" tie back liner and LTP ran to 8670 to isolate the Put River perfs. • The primary barrier for this operation: a minimum EMW of 8.4 ppg. • A X-over shall be made up to a safety joint including a TIW valve for all tubulars ran in the hole. Well Control: • BOP diagram is attached. • Pipe rams, blind rams and the CT pack off will be pressure tested to 250 psi and to 3500 psi. • The annular preventer will be tested to 250 psi and a minimum of 3500 psi. Directional • See attached directional plan. Maximum planned hole angle is 91°, inclination at kick off point is 86.6°. • • Magnetic and inclination surveys will be taken every 30 ft. No gyro will be run. • Distance to nearest property—27,000 ft. • Distance to nearest well within pool— 1,000 from 18-31A. Anti-Collision • No anti-collision issues Logging • MWD directional, Gamma Ray and Resistivity logs will be run in the horizontal hole section. • Cased hole GR/CCL/MCNL logs will be run. Perforating • SWS 1.56", 6 spf, perf guns • The primary barrier for this operation: a minimum EMW of 8.4 ppg. • A X-over shall be made up to a safety joint including a TIW valve for all tubulars ran in the hole. Hazards • Drillsite 18 is not considered H2S drillsite. Reservoir Pressure • The reservoir pressure on 18-27E is expected to be 3,294 psi at 8,800' TVDss (7.2 ppg equivalent) • Max expected surface pressure with gas (0.10 psi/ft) to surface is 2,414 psi. • A EMW of 8.4 ppg for this well will provide —549 psi over-balance to the reservoir- Ivishak. • A EMW of 8.4 ppg for this well will provide —685 psi over-balance to the reservoir— Put River. Troy Jakabosky CC: Well File Coiled Tubing Drilling Engineer Sondra Stewman/Terrie Hubble 564-4868 2 TREE= 4-1/16"FMC WELLHEAD= FMC SAF NOTES: WELL ANGLE>70°@ 9830'&> ACTUATOR= BAKER C 1 8-27D 90°@ 10104'.ORIGINAL 18-27 WELLBORE NOT KB. ELEV= 53.35' SHOWN BELOW 7"LNR MILLOUT WINDOW@ BF. ELEV= NA 9827' (18-27N;18-27B NOT SHOWN. KOP= 4000' Max Angle= 97 @ 11055' Datum MD= N/A WI 2223' — 4-1/2"CAMCO BAL-O SSSVN, ID=3.812" Datum TVD= 8800'SS GAS LIFT MANDRELS ST MD TVD DEV TYPE VLV LATCH PORT DATE 13-3/8"CSG,68#,L-80, ID=12.415" H 3497' 1 2986 2986 1 MMG DOME RK 16 03/08/07 LI 2 5308 5198 28 MMG SO RK 20 03/08/07 3 7260 6898 29 MMG DMY RK 0 08/18/05 4 8439 7839 42 MMG DMY RK 0 08/18/05 4-1/2"TBG, 12.6#,L-80, .0152 bpf, ID=3.958" --I 8629' 8629' -J 9-5/8"X 4-1/2"BKR S-3 PKR,ID=3.875" Minimum ID =2.377" @ 11745' I II 8662' — 4-1/2"HES X NIP, ID=3.813" 3-1/2" X 2-7/8" LNR XO 8678' — TOP OF BKR TIEBACK SLV, ID=7.50" / 8683' H 4-1/2"TTP, 12.6#,L-80, .0152 bpf, ID=3.958" ' 8684' —I 4-1/2"WLEG, ID=3.958" 8684' — 9-5/8"X 7"BKR ZXP PKR, ID=6.30" \ 8692' H 9-5/8"X 7"BKR HMC LNR HGR,ID=6.25" 8699' —I 7"X 4-1/2"XO, ID=3.937" :\ 8829' —I TOPOFTNTIEBACKSLE 8838' — 9-5/8"X 7"TM/S-6 PKR 9-5/8"CSG,47#,L-80, ID=8.681" 1 9075' a ' 8842' — 9-5/8"X 7"TM/DTH-S LNR HGR 7"LNR,#, , , ID 6.276" — 9827' I I 9204' — 4-1/2"HES X NIP,ID=3.813" 7"LNR MILLOUT WINDOW (18-27A) PERFORATION SUMMARY ' 9827'-9850' (WHIPSTOCK NOT SHOWN) REF LOG: SWS MEMORY GR/CCL ON 10/04/00 ANGLE AT TOP PERF:48 @ 8710' 10008' H 4-1/2"HES X NIP, ID=3.813" Note: Refer to Production DB for historical perf data SIZE SPF INTERVAL Opn/Sqz DATE 3-3l8" 6 8710-8750 O 03/21/05 11500' H 4-1/2"WFD CIBP(02/23/09) 3-3/8" 6 10860-10940 0 02/25/09 4-1/2"LNR MILLOUT WINDOW __-- 11641'-11647' (18-27D) 4-1/2"LNR, 12.6#, L-80, IBT, ID=3.958" —i 11641') 11650' -{ RA TAG 4-1/2"WFD LSX/N WHIPSTOCK 11641' 4-1/2"CIBP — 11682' 4-1/2"LNR MILLOUT WINDOW 12266'-12278' (18-27C) I 4-1/4"x 3-3/4"OPENHOLE H 12200' DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT 02/23/93 ORIGINAL COMPLETION 03/03/09 SRB/SV SET CIBP/ADPERF(02/25/09) WELL: 18-27D 04/11/98 RIG SIDETRACK (18-27A) 03/19/09 NS/SV FINAL DRAFT CORRECTIONS PERMIT:P2051330 11/01/98 CTD SIDETRACK (18-27B) API No: 50-029-22321-04 10/18/00 CTD SIDETRACK (18-27C) SEC 24,T11N, R14E,893'SNL&236'WEL 09/28/05 NORDIC1 CTD ST SUSPENDED(18-27D) 03/08/07 CJN/PAG GLV C/O BP Exploration(Alaska) TREE= 4-1/16"FMC WELLHEAD= FMC ACTUATOR= BAKER C 1 8-27 E propos( NTIALY NOTES: BL ORE,SDEfRACK"A' AND 3B"NOT KB.8_EV= 53.35' BF BEV= NA SHOWN BELOW MILLOUT @ 9827' KOP= 4000' Max Angle= )7 @ 11055' Datum MD= N/A O Datum TVD= 8800'SS 2223' —1 4-1/2"CAMCO BAL-O SSSVN,ID=3.812" GAS LIFT MANDRELS ST MD ND DEV TYPE VLV LATCH PORT DATE 1 2986 2986 1 MMG DOME RK 16 03/08/07 13-3/8"CSG,68#,L-80,ID=12.415" H 3497' I I I 2 5308 5198 28 MMG SO RK 20 03/08/07 �J1 3 7260 6898 29 MMG DMY RK 0 08/18/05 4 8439 7839 42 MMG DMY RK 0 08/18/05 4-1/2"TBG,12.6#,L-80,.0152 bpf,ID=3.958" H 8629' X 8629' H 9-5/8"X 4-1/2"BKR S-3 PKR,ID=3.875" Minimum ID =2.377" @ 11745' I I 8662' H 4-1/2"HES X NIP,ID=3.813" 3-1/2" X 2-7/8" LNR XO 8678' HTOP OF BKR TIEBACK SLV,ID=7.50" //- f / 8683' H 4-1/2"TTP, 12.6#,L-80,.0152 bpf,ID=3.958" 4.5 KB LTP. 3.7 Deployment Sleeve x 3-1/2" Liner 8670' 8684' H 4-1/2"WLEG,ID=3.958" 8684' H 9-5/8"X 7"BKR ZXP PKR,ID=6.30" (� 8692' H 9-5/8"X 7"BKR HMC LNR HGR,ID=6.25" 9-5/8"CSG,47#,L-80, =8.681" 9075' f , 8699' H 7"X 4-1/2"XO,ID=3.937" \ 7"LW,#,,,ID=6.275" — 9827' \ 1 8829' H TOP OF TW TIEBACK SLEEVE 8838' H 9-5/8"X 7"TM/S-6 PKR 7"LNR MLLOUT WNDOW (18-27A) A 8842' I— 9-5/8"X 7"TIW DTH-S LNR HGR 9827-9850' (WHPSTOCK NOT SHOWN) I I ' 9204' H41/2'HES X NP, ID=3.813" 3.7 Deployment sleeve 3-1/2 , 9,600', TOC • 10,300'-4-1/2 whipstock KB PKR - set with rig I, % 10008' H 41/2"HES XNIP,ID=3.813" CTU pre-rig Drift \ . 3-1/4 x 2-7/8 X-over 10,800' PERFORATION SUMMARY `�f;. 3-1/4 x 2-7/8 Liner REF LOG:SWS MEMORY GR/CCL ON 10/04/00 ANGLE AT TOP PERF:48 @ 8710' 1 Note:Refer to Production DB for historical perf data 10,845'- Billet 13,185' 18-27E SIZE SPF INTERVAL Opn/Sqz DATE 4.125 x 3.75 hole 3-3/8" 6 8710-8750 0 03/21/05 11.315' 18-27E PB1 3-3/8" 6 10860-10940 0 02/25/09 \ 11500' d 4-1/2"WFD CIBP(02/23/09) 4-1/2"LNR, 12.6#, L-80,IBT, ID=3.958" R 11641' 4-1/2"WFD LSX/N WHIPSTOCK --� 11641 4-1/2"LNR MLLOUT VVNDOW J 11641'-11647' (18-27D) —I 4-1/2"CIBP 11682' 4-1/2"LNR MILLOUT WINDOW 11650' H RA TAG 12266'-12278' (18-27C) I 4-1/4"x 3-3/4"OPENHOLE H 12200' DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT 02/23/93 ORIGINAL COMPLETION 03/03/09 SRB/SV SET CBP/ADPERF(02/25/09) WELL: 18-27D 04/11/98 RIG SIDETRACK (18-27A) 03/19/09 NS/SV FINAL DRAFT CORRECTIONS PERMIT:42051330 11/01/98 CTD SIDETRACK (18-27B) 03/29/12 PJC DRAWING CORRECTIONS API No: 50-029-22321-04 10/18/00 CTD SIDETRACK (18-27C) SEC 24,T11 N,R14E,893'SNL&236'VVEL 09/28/05 NORDICI CTD ST SUSPENDED(18-27D) 03/08/07 CJNIPAG GLV C/O .1 BP Exploration(Alaska) C w U e g -I N R I-' a =2 a a i ° A LL1 4 81 I i n1 e lot -1 - :4 " 712g I '_.. ' 1= Oo s C U 1 w C @ UU 2 „1 111 ._ f Vi e + U K U' g $ I III _ ' " Q O. I U III CO I I I 0 I I Alli I J II11 I11 O $ x I —� ' U 11 . 11 Z ' III! U III 4:C F7 I 11 r � I z I O g n m jr' 1 'CC1 7, m c = III J � xE E U ir I W LL • U" = . , U • • • • © III 0 IIFI . 11 6 _ , J ♦ I I) E E W ,111 c„.. 111 _ W COm U" f 111 el • ®• 1 Y01 o 1a U ..7 O 1 12 F ti 7.ffiL JI ..- li111111111111 1 I .Q 1 I U s` CI mroe I m 0I O a II NI M Z m z a 12 ! I 6 111 11 4 .. _.... I III] 1 i c I € ] °° 0 u .� Z ILII—III Iii — ....._.....__.... a m 0 0- CO IQ Cn Q 0a. J Q C)W I RS 0) 0 _ ■— XI C = E 1- N Q g. N • r■� m c 0 N k am W 'trcn w a 74 as mum• o -aptisi ti c W m oo as co a `m; Z aa � � a CO o gi W H Z co N. n. a _0z z ro 1n o 0 N to O MO 0 1fj N6 ,_ tcei o CO tei 117 11) 117 Oo 12y Z0 N 0 NO Po U) a r .4. r- •- a N U = .C O 0 a . rj o C) 0 a w Z a U a) E o m _ a= = a m o a) 1ci7 73 U )w N o r) z > 0 s r` 1n • 0 Q J Cea m a7 aoa N @ O co Cl) c.) 3 7 u)3 0 d d J ui a 75 C‘3 N C co C C C a ' C 2r° F2Li 277 ED .. c 'o a) j J cu J 0 a) 06 7 O C-) a ( O t 0 C CD'O o O J J C7 L NS cn a> E a) u' c C o c• a)) •• c 16 E Cl) C a 0 C) d O 7 a CD• C u 0 a) 0 cm O ii vo d CV CC >, m E = c N 0 mm a) L a) � a) in NI-O • - O as 1n v, cc _ o J > - Z = O N (+7 co O = = = a M N In v v V 0) CO CO O CO N 00 0 t1j CO 111 a7 ci) O 07 C O O C Q) 10 .. t1j < 2 C G L .Q p o 7 O H lC C Q > O O U 1. a1 W O 0_ 7 ',,. .. a) _ F + N P C O) a7 re - O L' C• C 07 a) Oa_ 0 l00 = L C L Z W N C l0 a) of C u Z W .0 (9 O a) Z = 0 O + 0 ' z a Q N m ; Q) 0 uJ m N a) rn co 0 O.Iii — LL Q o 0 o a 1 T h Z ^ O O O N C 0 CO CD O O N O O ci 0 Q °° d N o �� v w E 2 Q C Q O Cn a7 N L ay n n co 7 Cl? C N N Z C7 14 co c) a «N N a n co co 'O m a � c0 co m a).- a) y 0 E m a �q �e _ _ 2 = a CI N N C D Z CO . ` Z W i„ o 2 CO (0 ap f6 C C Z z a a a . IIr 20 v � .w y 7 Wv C .. N c •N C N c a0. V 0 N ai M'D as O c >. as o 0 0 0 0 o m C Z C To 4x ay .. a m aa; COON a = aF. .0 c m « c v Oa (�- oQ Q m ° : o mm y am « c m m 1/1 d R mmm ao 7 Ua 050 a 20 2 to inu_ a 3 a E 0 < > > co 1n _ CO O O O O N- O O N V O N O) N N- 0Q O O C) V CD r O N C) CD O O O CO M O O N N O O CA aD O O 00 O O W CO O) O) C) 0) 0) CO CD CD (A CO 00 CO CO CO CO m N 3C) V (p R o LL v O O N 0) ' O) CO r� 1` CO r CO O O O a- N O CD U) a O CO CD a- O CO CO a- CO N CO CO V a- CO a-Na. O O M CD N O N CO M6 M6 O .-- N r I` O co V V V V CO CO CO O CO CO CO V = o V V V CO O r CO CO O O a- a- N M V V O U) = N N N N N N N N (4 M M M M M M M (.) O >:? N O /35 mx 0 a` c, 0 O Cvi ZO co O O o O O O O O O O O O O o J O o < o N- 0 0 0 0 0 0 0 0 0 0 0 0 0 0 N c 6...A 0 O O N N N N N N N N N N N N N CO f0 V E co O r r r r r r r r r N O —- N N 0) •C J a CC) CO V CO CO 0 O CO CO O CO V h O CD o .a CO N N CO CD O N CO CD CO CA 0 a- V CO CO C p O O r. CO V O O n V CO M O CO ` t W r O CD O CA CA CO (D O M N N CO y rn O CO O b CO r f` O CO CO CO CD CD CO O CD I" E. N- r r- N- N- r N- N- N- r f• N- N- N- r r- Cf 2 N ..'� W as co was Co CD CD Cb CO CO CO CO co Cb CA C @ (D CO Co as as Co CD CD CD CO CO CO CD CD CD CO 0) O W (0 • d 0 C d C R -0 V 0 0) O C C U n N O N N N O N CD V I"- CO (D N CA C d a) w . CO 00 M V CO N e- O M 0 O M O V CO V O w C) 0 N CD oz; r- CO V O CO M6 M6 M4 M N r` o /U R' T co O CO M v CO O CO N N CD N N N it & .0 y -0 C N N N N CO Nr_ O CO CO r CO CO O O a- a- ra ✓ O r Z « a .O .O L = N N N N N N N N N N N N N M M C) o QooR co D co D CO co CO co D CD O CD CD CO CD D J Zn ' m m m -cC rn CD 0) CO 0/ CI) rn al C) a) O rn rn 0) CO � -C CO O Cfi Cri ri crCO O O O O CO Cr) Ci Cri C Z 0 CO CO CO co co c0 CO O r CO CO CO O O N O CO N ID ID CO 0 0 0 V n O Co M O :I- Co co r-- N O co r O CO �j 6 MCO Co CO V CO CO O f` CO CO Cb V 0 O CO O I,- N CO Co CO CO C) Cl V CO CO C O O O O CO N- N- N- r CO CO CO CO O Co 3 ' C7 ,;i C) Ch Ch M M M M M M M C7 (h C7 C7 O S! 0 U CD O CO CO a- CO CO CO CO CO N r CD N V V a O O O M CD V M N O O O CO O N- Co CO O CO O W — O C) CD O Cb N M M N CD 0 E CO co co n CD O O O CC) V N- V V V O CT 10 CO M M Tr V O CD N- Co OO co w— N N CZ Z O O D N ,- N- ,, r .- .- N N N N o Z .. 2 2 2 O co N- O V O O r O O co r- CO co N O M O V O O r I` co O O CO O CD CO CD r N O O N O V O O O CO O O ON CO M V V O O O CD CD CD V) CO CD (0 CD CD CD CD CD CD CD CD CD CD CD CD CD O 0 CO Co co 0o 6 6 c Co Co Co m m m m o0 Q 1- N- r- N r N N co Co co O co r O N O N- r CD V V O N- CO o0 v 0 CO CO N N CO CO CO I` .- r- e- a- O p �jm CO O n r O M O O V N O CC O N M > > W co O O O co V O O V CO V- -0 Q N N N CO CO co co co CO CO CO M r 0 d T Z N NZ ri) u) c° o a Cn N L. N N N O N N J O N O CO -C r n N N. O O Cb O O a- O r Q (D CO CD CO O N O (O r CO O C) V V O CD CD CO CO CD (D CO CD CD O CD CO N- r r (0 ..• .- 0 CD CO CO CD U) CO CO CO CO CO CO CO CO CO CO CO OD CO C.) T M Ni LO J O CO O 0 �•. m co m 0 Fr N 0- C * 0 • u a 00a-- o Q o u) WN o .0 N N C o (0 Es Z• a a r° °r a o ((°n o o CO 0 0 CIO 0 0 0 0 0 0 0 0 0 0 0 0 Cl ca 10 Q . �+ 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 � v W a ` V O O .. O o 0 0 O In O O 6 O O o Cr) - a' O 0 N 0 O O 0 0 0 V C) O N O O O co 1.�= C E O a0 N p cV M a M ,0 V_ O CO r` Co co a) 0 0 • N C') CO (0 co EWO c __ F o Oo to O o ao 0 a0 0 0 0 0 0 0 p Di ND m E •O E O N 7) Z CCE N Z Ua` 'u)550 . to a - c0 0, n. 3 0 ^ O 0cci m ID ct I- 3 Sr LOO oD a0 ON J " N 0) O Co 0) a Sr sr s— a v C) Md _ Z Z o EJ M= v n U 001 O Z -O > .... N N C a) O a I = 5 a` o >Tu Ci to U '' eCo o m ri Z Z J O 7 Q J O O NCa A U N- N- 0."--1. a) E co C N. E d o ca Na) o J O O a) CIo C r° H2W nO n N CO O C ^ n 41 co : CO CD 1 C ao• 16 2 L O W w (U C _ a) N F C a) as, c0 c0 O W O )C) O �6 a) :7 0 0 a) 0 N LC) CV a) C - O O N a) O = ' O r) a O C O r- CSI i C J O n _ - Ta L a7 d C O (A r L O CO CC) C) ❑ «O+ Lc) O O J CV I-2 Z Cn C1 O Z 77« C') O L. � 0 Z C m °' 7E _ N Q 0 a) LU rn r) r) co O C _ co J $ r O 0= W th c-a �+ o o O W o o co C•) a)CO 0)n a) CL rn ri co o co m ON LC)COs- - m 0)C') NM O co Z Cy E a a 'O @ co z + SCD v c F-UJ � LH , a N N CV 0 O O E CO CO CO CD N N Cr) (NI CO Nr N- LO r) O O O_ 0 N Z CO r) O N- sr Cs)0 )f)❑ > O r) CO C) O O to r- a0 co O C(O F OI- a(00 W M M C7 r) r) C°) U) '5 00 00 m + tl)�. C ❑ = N- 6 'a co CO 0 co co O o o o — CD u0] CI 0 O Sr O O ) O cc) O N O ` coW J � CCLO CD N- Lc)O O O CD r) r) r) N- W N i5••••• O r) _ Ca r- ,- ,- N a°- o CDUl N - + a a co M 00 5�. o v co v rn O CD < f0 i0 L 47 N- 4 O a= O C) a a 0 CD CC) M N- LO N O= O N = sr N CO O C7 CO N- Cr) O J 0 O y p M O CO Cu.) +L+ 0 co 0 s- U) coO Q u) o n > t y 4- to co_ co CD CD CO co Q". _o a ❑ DO co 0o co 0o ao U CU a a) a`) )n O •7 ca L) -- c c a v v o E m cc, d C 0 0 y rn N .O O) 0 0 0 0 0 < O W O CL ` 0 0 0 0 0 0 _c -c Q N- ^ N a p) m O C7 CA a •C 4 0 0 ui ui Cn N N C 0 3 CA O N V N O ? CO co c0 lQ d I-r0 H 03 g d s N M r) co O co Zaa a a) CD ft) mN c a) ❑ O O O O '— — Q 111 W ; O ~ 2 y = N O v N /1), = Y C`) i�0g= = E U) a) o.E o•E •o o c") Wo hh ❑ •E aa c aiTS __ a7 N CO c atLC ZcO m m CD CO CO U a Z Uain33 ❑ a F- ico o H i AdW — 14▪ ' I Z Y n n ry m 0 ; v. p ----a- _ e al W Y` 0 ao to I m ^ _ ti C _: - ._.__--_. _g _ P, z , 2 -1 a F +, e= _ gao moi 8 1 � M rE , Nlil m �+ h -- -_. - sErceor, �Z _ 6 cFl IIO Ima� 1 Cr ei at v o n - I--' _ Cji Y g O. _ c2z o O. g ` + mM C 67. r p Q v cn .1W• do • c a o� W w 3 d _--o- t. 8 e o o ^ o o 1 so N o oo 6 -^o C S - (u!/8 OL) +)ulioisa-)r{3nos F. 5 4 r4 �Q2 M a K mrt Q O , U a4aR 8 ') Re 9 U N i Le 8 I _ > .Vxugieu,,9ro 8sw.5%me IT ee T A m cow Mil N 18g8888 1::1 aa.- I I « - az .. 9 ,'",.$888 c• aN o �li oo< o i _�� d N �� wch 0 Etc., g AKtA �4 W N w� co FA €m Pg8r'="71A on MMk-V- a. 1 CI -131 ID1:1^ --T a,. ; iN 0 oa,00000 moo m m s - m.- -S_ 0 .Y`' +0 y m 3o m (u?/8 0£)g3dau jea!uan ares 0 h W Elmo MD a F. e: F. m w 4 rn rl cV P N mut g g s 009$ o tl m m�5 IH1I 711os9s' i �09L8 W -73 O :,:i N W �m "J nm0t I �'Ob::m d 5�oaQ. N o 00 J In Orn 2. a oz-6:, j 8920 6 m f g� ",$3 a IIS 9 T W y tea- 2fl m ag lifal /�\\ I 0006/ �`4 1 fig06 0. — . s w " ' I i N q%. r b a p =NENE T aw I ■ T Ing k. li fOZ£b it v -Li - v N N 6-: �° 4 MILIIIIMI 4 Q q !� gg i 9 ,, $ `y r e� ,,r, N N _ § S F. w a n 5 a ma 1 0 I __...i v 6, i i e a a. N NI N 00 IA i. �ypp W o00 m3 'SrASEa o V^ m pa k WaaRm °Vi0. 3 3 s oa�aass .1 > S3•Zm ss ast3 as3 g i33 s gg gg3i 5555,39 9I rnnN w 5.a63Fygs33gs%34g.9Ng9 3.3$SS`3� 4557E7"±S2 d 5 5 T 1 90 = g�g8 77Y2§§222$§!LI,!!i!2.1.amsmm.LIV, mea2Z%22%2i 0 3 y > a,ggt2 *7 $ yam, ' �+ m p m * 1 1 1 / 1 1 1 1 1 1 1 1 1 i i 1 1 1 1 / 1 1 1 1 1 a 1 / 1 1 1 1 I / 1 / i / 1 n F w e A oO1�� g� - FR rh+��. c oN aW l" � xi z- R388$$ ;2e $ o 0 o 0 0 F. 1j o C LL Zz00 gac O �b O po n O ., 1 'Egan LL 3 N C E m $Eo 1(°::::: o NaErtm CD 0� v) U J oa) U C1 rn U 1 ON ro r _ tN h a, N . m N O > CO \ u Of ,-. TO I N' + _ m ppm m W �`� .\6•• O N 8.� W- •7 9 03'- "- Z �` L Y 3 2i7,- ` \ ' N d N a . Q 550 - m .. E .000000 ti o) 0 - r 1111111111.1 N N8 N N ri.I BAKER HUGHES INTEQ North America - ALASKA - BP Prudhoe Bay PB DS 18 18-27 18-27EPB1 Plan 2 Travelling Cylinder Report 08 August, 2012 Qbp Fan BAKER HUGHES Travelling Cylinder Report 0 bp INTEQ Company: North America-ALASKA-BP Local Co-ordinate Reference: Well 18-27 Project: Prudhoe Bay TVD Reference: Mean Sea Level Reference Site: PB DS 18 MD Reference: 18-27C @ 53.35ft(Nordic 1) Site Error: 0.00ft North Reference: True Reference Well: 18-27 Survey Calculation Method: Minimum Curvature Well Error: 0.00ft Output errors are at 1.00 sigma Reference Wellbore 18-27EPB1 Database: EDM.16-ANC Prod-WH24P Reference Design: Plan 2 Offset TVD Reference: Offset Datum Reference Plan 2 Filter type: GLOBAL FILTER APPLIED:All wellpaths within 200'+100/1000 of referE Interpolation Method: MD Interval 25.00ft Error Model: ISCWSA Depth Range: 10,294.09 to 11,315.00ft Scan Method: Tray.Cylinder North Results Limited by: Maximum center-center distance of 1,327.74ft Error Surface: Elliptical Conic Survey Tool Program Date 8/8/2012 From To (ft) (ft) Survey(Wellbore) Tool Name Description 951.56 9,733.16 18-27 Srvy MWD(18-27) MWD MWD-Standard 9,830.00 10,294.09 18-27A Srvy MWD(18-27A) MWD MWD-Standard 10,294.09 11,315.00 Plan 2(18-27EPB1) MWD MWD-Standard Casing Points Measured Vertical Casing Hole Depth Depth Diameter Diameter (ft) (ft) Name (in) (in) 3,499.45 3,445.94 13 3/8" 13.375 16.000 9,071.45 8,207.08 9 5/8" 9.625 12.250 9,827.00 8,564.64 7" 7.000 8.500 Summary Reference Offset Centre to No-Go Allowable Measured Measured Centre Distance Deviation Warning Site Name Depth Depth Distance (ft) from Plan Offset Well-Wellbore-Design (ft) (ft) (ft) (ft) Lis DS 02 L2-21 -L2-21 -L2-21 11,166.08 10,675.00 245.76 206.18 56.87 Pass-Major Risk L2-21 -L2-21A-L2-21A 11,166.08 10,675.00 245.76 206.29 56.76 Pass-Major Risk L2-21 -L2-21A-Plan#20d 11,166.08 10,675.00 245.76 206.01 57.04 Pass-Major Risk PB DS 18 18-05-18-05-18-05 Out of range 18-05-18-05A-18-05A Out of range 18-05-18-05A-18-05A wp07 Out of range 18-07-18-07-18-07 Out of range 18-07-18-07A-18-07A Out of range 18-07-18-07APB1 -18-07APB1 Out of range 18-07-18-07APB2-18-07APB2 Out of range 18-08-18-08-18-08 Out of range 18-08-18-08B-18-08B Out of range 18-08-18-08BPB1 -18-08BPB1 Out of range 18-27-18-27-18-27 10,344.61 10,350.00 91.46 54.13 48.67 Pass-Major Risk 18-27-18-27A-18-27A 10,324.97 10,325.00 0.75 2.72 -1.97 FAIL-Major Risk 18-27-18-27B-18-27B 10,324.97 10,325.00 0.75 2.72 -1.97 FAIL-Major Risk 18-27-18-27C-18-27C 10,372.63 10,375.00 0.78 5.96 -4.94 FAIL-Major Risk 18-27-18-27D-18-27D 10,324.97 10,325.00 0.75 2.67 -1.92 FAIL-Major Risk 18-27-18-27DPB1 -18-27DPB1 10,324.97 10,325.00 0.75 2.78 -2.03 FAIL-Major Risk 18-27-18-27E-Plan 2 10,850.00 10,850.00 0.05 0.83 -0.77 FAIL-Major Risk CC-Min centre to center distance or covergent point,SF-min separation factor,ES-min ellipse separation 8/8/2012 1:57:03PM Page 2 of 21 COMPASS 2003.16 Build 73 a 0 0_ CO I a V♦ 0 a 0- a a,W I }}•.��•.�� cf3V! _o .c ■ ^L ii W E 1 aN � N o N =moo CU C IP a VlIIII o ,.rA= Q 73 Ci N N a = muio m= a z . . . . . . . . . . . . . . . _ . . . -- - - --� -- m a \ z zz 0 § in = to CO Lo ocncsi oj_ $ � � \ \\ j )/ . 01 \ \ _ = k § § m _ § k jw . CD u \ _( G) § ) \ a )) \ . k \ _ ` o \ k cc = k •,..: -a ) } \ / 3E 277 § — CIk 0 > \ \ G � �k $ k 2 \ \ � co Ns- a) al ; ) .. jE § 2k ( § . 9 | C } - .. R ) 3 ƒ } 2 \ \ E = = £ it k § ■ J = oma C / 75 D \ / § } jk © © ° ... C) - - -LC/ 01 G .a• E ) LO ° ° _ _ _ƒ 01 OD C . F L6 /� I- a CI 0 o % f _ c o \ E ƒ r / i C §k 2 \ { 2 � / ƒ 7 C ^ 7 00 — _ zWU « � � z � k \ f A ƒ ¥ § { 2 j CV I cv B/ § 2 2 m -o_ to -D 0 CL 2£ § f Q. \\ ° ° \ M %§ k o00 CI 2 . a -0 co Z C 0 o \ \ z 0 , : , _ _ o ) e 2 gN. « CL _ ,— .— 2 CO CO ` m � E02 ]- CO] k k \ 2k � 2 \} \ $ � � > } » Ek ) ƒ I .. \ II 16 r k ° o Mai1111 m kE k \ k \ tC.0 c0 ��■ - - § § § $ z 2 «■ 5 �O.� .. j § , CnCIN a- E. % _ 2 ■ / • \# � = � f ° g a a § � 2 = % k a ' % ■ 2 \ Z 3 � a ( ) A � A � � u) u_ 3 ( ) £ o « > > \ CO _ O 0 00 0 CO a _0 0 N CO 0 0 CO N Q O O r- O O O 0 0 0 0 0 0 O CO 0) a O CO r O O O O O O O O O O O O .0 co co 0) CD 0) O) 0) O) 0) 0) CO N O) 0) m 0 011:1 aH O() O N CO LO H r CO O O LO a CO O a0 U) a 1 CO In CD NY CO 01 LO M M r co O a a N0 M O O O 0) 0) 0) CD 6 a ,- O N CO CO N N N a CO N a N a LO CD CO CO N.- c0 O Ne N M M co- M M M M M M M M M co co 0 O Z j O 0 Tv 0 173. aa) c• v 2 z o 0 0 0 0 O o 0 0 o O O o 0 0 J LO 7 < O O 0 O O O O O O O O O 0 O O N0 Aj, U O N N N N N N N N N N N N N N 00 (n 0 7 O)= y O CON a) -E 2 JO CD y 0 7 C Q ❑ . H w ° Co M CO W CO a LO 0 0 r CO N N C.)) .a CD 0) N CO CO N a- CO 01 CO N. r O C O r- MO O O N M Co M 0) (O (O U) O (O d L 0) 0) 0) 0 00 LO a N 0 (0 LO LO LO LO N y O Co co co r M O CO Co (D LO (O LO in 6 1) aiZ.; r r r r N r N r N- N- N- r r r r m 2 'y = co 0o co 0 00 00 0 Co 0 0 0o 00 m oo co m C CO co (D CD CD (0 (0 (0 CO CD (0 Co CO (0 CO CD m ° w R N 0 • () as a C C) C) 3 C y C v N O r r N LO a s-- CO CO CO CO r r Q ` dM N O CO r ((7 M N O CO CD CO CO M O � O w 0 C) 0 N CO M M (Ni LU M 0) M (O (O 6 LO LO N o 0 X T CC O CD N a N N CO LU O 0) 0) 0 N 0) 0) Ta C' t y O C CD r- r CO 0) O O O .- .- N CO CO M a ` Y N N N N N M M M M M M M M M M c) ❑ ❑ 0 7 (6 "O a P a r V (D CO (D CO (D (D (D CO CD CD CO CD CO (D CD J 2 Z W ❑ CD C6 C6 CO O T 0) 0) 0) Cr) 0) 0) 0) 0) 0) 0) 0) 0) 0) 0) C C C -17 C Z In LO (n In (O LO (17 LC) LU LU (O O LO LO U) -= 0 CU Ca CO Ca Q 'a (n CO (n U) ' ' ' CO 0) O 0 M 0) 0) (D 0) r 00 M CD v 0000 CO (0 o) Cr) oo v, CO 0) m m CO a r C) CC g m 0i Di rO a; N a CMO oO co m r r 6 m0 co CD CO 0 6 0 0 CO 1` N- m C0 CO rn CO rn CO 0) I r r L(7 M O N M ; ;=0) r a M M M (D(D O O O 0) a N O 0) LO r LO a a CO C1O r COO C7) O(0s- s- a- a- N N N N N N N N 0- o Z— I°- 2222 N r 0 0 N- CO CO 0 a s a CO N CD CO N r C) CO (D LU LD (O a CO N N a0 0 CO M Cr; M M M M M M M M M N O (D a s a s a s a a s a s a a co U) co co (0 (D CD (D CO (D (D CO C0 CO (0 CO (0 ❑ CO O CO W CA O (0 O CO CO CO O CO O O Q > — r N-- N N o) W r N- O MCO N v Qr CO v LOU) (17 a- LO LO (O LO r (O a • > 1- O CO 0) 0) r LO M 0) L() r 0) O .- M > 2 W W coCOCr) COM COCCO a LO LO d- a ) co co co r r m G7 Z N N T N Aco Tci) u, N ; r n N N M N N C C co H CO CD ° n' O r M N- r CO CD CO (D (D (O (O CO Q s- O O O O O O O O O O O CO N CD 0) CD 0) 0 0 CD 0) O O O O O O O O O O N N CO • 0 0 0 co O 0) CO 0) 0) O) C) 0) 0) 0) 0) 0) 0) 0) O T ❑ 06 6 co 0) a co (.i--. m W OF r N W C�„r Q ornoo0 jCV ❑ N N C E M A Zaar° r° a o L(0o0CD 0 00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Q • • T 0 a 0 0 0 0 0 0 0 0 0 0 0 0 0 0 N IP I a to M rn v (ri p o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 W a 0 N 0 0 0 N CO 0 0 0M 0 0 66 Lill O CO CO N CO 3 CO Y 0) CO O N N N ,-- CO a Ln CO CO CO r co ��e D co c .. m F o rn o o o a o o • r ta m [. o' •owmmy a m N Z (..) a to ❑ (n a co 0) C- CD 0 Q) 0 0 CO 0 0 (D CO V 0 e- C) (C CO 0 CO l- CO t\ Q. N CD O O O O CA 0 O O W W N N N (D O (O O O O O (P CO CO W O W W O C%7 W W (A O O O O CA C) C) C) 0 co Cb co W W OD aD M W 00 coca O) O) C) O) m 0 a) RI o CO ~ M O O N Cn CO CO O) (O 00 00 00 U7 r 0 CO M N. N N (D L CO d CA (O — CA CO CO CD CA O M N O O CA 0 N - et O .- a V' CA (D u') 4 M M M N- O O 4 CA O06 O M N N — N 0 I` 0 N- CA 0 0 CO 0 0 0 CO CO CD CO W N' 00 00 CO CO U = C) CA CA 0 0 0 A- N N M V (O (C) (() CO h CO CA O O a- N 0 'O N „ M M 4- V V' V V V a V a 'V 4 4 (O (O (O 0 O >:? N O 0 M Z Z o o o o o o o o 0 0 0 0 O co co o 0 0 o 0 0 CO = < o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Na) tsla1 0 . N N N N N N N N N N N N N N N N N N N N N a) --'" r r r r r r .- s- .- e-- r r r r E m co (n V E m o CO N 0) .- .e -I 0 0) CO co CO N. (O (C) M CA W CO0 N 0 N- W 0) CO 0 C) .•• N` N N (D CA M N N V' CO m M v. ,_ NI- (O O co CA co. C o ,- O - co M O N CA M N N (O (O V O (O O r ` t co st N CO n CO M CO M N. CD 0 CD M M N 0 CO w d = V V sr co co co M co M N N .- A- O 0 0 O O CA CA dce - R. N- N- N- N n N- r I; N- N- N- N- N- n N- n N- (` (0 0 N co co co co co co co 0 co co 0 co 0 co co co co co co co 0 C R CO CO O CO CD (O (D (D CD CO CD (.0 CO CO (D CO (O CO (O CD CO 0) O W R d i+ C 00 d C 10 C _ _ 'O y C t.1 00 0 N- A- N CO CD •- CA C C N 00 C- O V' N- V' CD 0 Q d w l6 V. O CA (O s- CO F- M co r N M 00 CO CO O CO O M 00 o w y d 0 y N- O O n (O o N O 00 N N A- 0 r N CD 4 V N O 4-„, IX >, 10 8) co co (O co V co 0 M C') CO CA N. CO U) (O (O L d d C (C) (D CO r r r W Q) D) 0 .- a- .- N M et LC) (O CD I,- CO C0 Q Y (0 .- C') C') C') M M M C) M (•i V a 4 sr a a 'Cf a o• Q O 3 t6 r co co CD (O (O (O (0 (O CO (O CO CO CO CO O o CD CD CD O O J 2 co Q O rn rn rn rn rn rn CI) CD m m rn rn m rn CT) Cf) D) rn rn rn co Z (C! (Ci U) ui (Ci (C) U) (fi (Ci O. (Ci (Ci (O (C1 (Ci 1. (D (C) (D (O (D 0 Q M - co r M N 00 CD CO N- CD M 0 (O CO N At M (O mM 0 0 (O h N M (D N M h O CO 00 N CD CO CO M N M r N- (O r N O (b N N N (Li O N N N a- N- CO CO r co N M (O 0 CD F- M N. CO 0 0 N CD C CAO O O O O N— ,- N N N M M M NN V M) m to M st sr 1" I sr v v v v v •i v v v v v v Y Y H 0 U _ co r- h CA O V' h Cb O 0 O CO CO .7 CO (O (O Q. M l0 M CO n f` et M CO I` V' CO r O MN CO N CA N. CO (O N (O O M O N M M CD CO O D) 0) - r O) 10 r co r M I` CO 0 N M O O (O O 0 CO (O CT R R n co 0 0 Q) O O N M CO v (O CD CD C- CO O) C6 (n N N N N N N N CO- C• Cr; C• C' M CO CO. M M M M M M a Z n N M A- (O N LO s- (O COI� NMVNOa0r: : : MNNCOCDCOOCbONN_ NCA CA r r nMOV' LO (O M M M M M M CO CO M M CL Y C7 5 co N N CA W A- v CA N CO (D N CO M M CO 0 CO Q CO azt V M C) O N V N- (A N LC) O) NM M M N 0 W6 CA O) CA m CA O O O O CO CA CA CT CA co (A co co W CO co CA C) CA CA CA CA CA CA CA CA U T 00 N E m W C N Q N N N O O m 00 co (O Z d d Cl_ T o 0 0 0 0 0 0 o 0 0 0 0 0 0 0 0 0 0 0 0 0 co Q . > 0 0 0 0 O 0 0 O O O O O 0 0 0 0 0 O O O O C1 W 0 0 0 0 0 0 0 Lc; o 0 0 ((i 6 0 0 0 6 6 0 0 (D q 0 N- 0 N- CA 0 0 (D 0 0 0 CA 0 0 0 0 (O 0 0 0 CO Calling=u 3 co co M0 (P O N M ([) CO f` CO W O O r R C`) ,WY C ` CO Q N N N O N N N N — N N N N N N N M M M Q O) a .. C t` r co ' O) r- 1. l r ' r r ' N- 1- a- a- r F N m Er o 2 . 0 0 d (0 O z 0 a. co 0 a co fry a a m 0 CO CO CO ii: , rte) '0U J Ni Z Z U N Eco co U) 0 N N 1,'„," 3 .E 2 c ❑ 52 F- 2w a) U -o c o t w a) 2 c d o • c ai U as 'a C V C N (9` c o m w ra o J. d a) U y U ce y .0 T as L ar m F>— cL Z N ❑ 0 Q a) O) • _ O 0 m Q% ,1 a U) J U T (p m a0 E o L ° N No 2 co co co La C ' W o INS kWo T .11; rn MD t= d Cl tu d .. E Gil — m [� o ed+ a7 a) y Z 0 co co co 00co CI M co p M m N. r CO y N v O W r co N 7 O N tO O N- C) M () +_+ LO 6ED im O •� to to CO N W N O) Co N C (VW- N N N N N CO J to to c0 - to 6co d a N o I Z Z Z Z 2 Z Z Z 0 a I- CO to CD V- CO CO CO• 73 CCO, N o CO M co o Z Cl) O o cn to ci a O N co M M M Z U o' t ao eo co to -co ao wc.- Z J tO o Q J O O N- O O O O O N y@ U i I.-- N- r r n I- N N 0 CO C I� — Cp N og o 0 0 o O O o O o 0 0 0 0 0 0 0 0 m 0 ? E- ❑ O o 0 0 0 0 0 0 0 0 O o 0 0 0 o O {- M LI co co C) r O o o M C) M o 0 CO CO C- CO CO CO CO CO CO CO tO CO CO r LO O CO CO N CO CO CO CO V' CO CO O CO r O O a «) (A 't � (P ,:r V" a) I` r to r r r r r r CD r CO CD CD CD I- r Vco C o m co M M co co M O co co 0o O co O M co 'O ' CD co o co coO o o CO CO CO O co co co t0 o co E L W w d c is air o 0 o O o C. 0 o O O 0 0 o O O o 0 C y C.3 CO O O O o 0 0 0 0 0 0 0 C. 0 0 0 O o C) a) C NN co v6 0 0 O O N 6O s — r) O O ' C U E' (9 Co co N N N LO to N V' tO O V tO CO O d C N a) V sr co r N N O CO CO N CO CO N N N CO CO O 0) y (u U Cl) C M c. M M N N N M M M M st to tO tO N N y o co to o o co co co Co o o o co CO CO CO 'CD (,) s- = d r E CA O) O) CO C) O) O) O) O) O) O) CO CC O) CC O) CA 71 ce to tO to to to tC) tO tf) to tO In to to to tri In Co • p `a Z J 1-z ZcO0 0 o. N in N W CO ' r r CO IO CO CO CA (3) h- r..- r- I- r CO O sr O ' '' vr I, CO CO — r r M C.) CO 4 C) C) V r r O s- Co CO CO tO 4 4 O I- r N CO sr sr sr N N CO N N CO CO CO o to O O D rD O CO ( mr Nr COC) COO) O) Cr) O 0 3 W C' E Vii Ci c��j th c� �j ' v th v v�j v v v Cj i + m LLJ co r W ca CA M co co 2 co Q N CO R co co r M U N CO N r CO M CO CO CO N tO 00 to CSD CO CO N r 'is V .4 co to co r... r-r r CO r e-M 1— M) V. V I� N�) MO co O) CD N M N a O] C7) t0 Qi co t0 V cc; (o co r to W/ tO CA V co CO CO CO N tO'3 V' ' CO 0) CO CO CO CO ' CO CO O CO CO CU ^. to Z to .f CO M Z M ,— a Z ' M M O) co Z co co o Z O cc Z N CD N N N 2 .-CD x- e- N 0) N N N M Z V 6 V V N or N a Z o m aco w v V O) 4-.) r o LO CO N- tO r co N tO CO N CD .- N CO tO M N WM C) 0❑ O o O N 0❑ O O 0❑ 0 0 O N O CO 0❑ 0 0 0❑ O O> 0 0 op 0> O O 0> 0 0 0 op 0> 0 0 O> o O H 0 0 > O^ o o O~ 0 00 O~ 0 0 O H ON I- FN p N to N co CO CO sr $ M O M V N CO CO0 O) sri r CO 6 CO CD N O CO CO CO N c0 co M N CO co CO Tr O O co o O o O o O 2 O O o O co O O O= o o O o O O= O o 0 i • O� O h O� O� O co o co O� O c ° r co a) o N p,� CO O O) I. co 0_ p rn u0p _M co [O f0 (D fc o YN = co oo @ = 0 co co o Ch O CO O V o6 O= OIC o0 c)0 co.4- o� o n co),r. o00 o n o ) c).4. di OCD ON O(O OCD O� OM OCD o;co Q co a0 O 117 r a0 co C T T T T T T T T CO• T _a N c) Cl N N N N N N co p C C C C C C C C E m s- C) a) C) a) a) a) a) a) C) Q O w N N N al N CU N 5 N . -0 ❑ N N C 01 01O) O) O) OI O) O) N t6 as �6 m co . co O m N . Z d d d a) y N N N Cl, N N co . C) N a) N s- N (U N Cl) a) a) N C N n N .} V (Cl N lO N N CO N N N 0 tO Q W d y N C C C - to c C_ C .. A C C_ C ul .N .-.- = c C m y c c co Mom E y d OE �'o 'o NES = Emo o 5E �o o E , E J O Em'o o �'E mo C'7 �W0 T ` t6'£ a LL c Td d c c c>,d d LL c 2,d d F c c F c c c Td d if c Td C) `�Ct, •• Z CO 0 O Cc) O CO o tc O CO O co o CO O CO O �' v O c 0 r w as w T=L 0- w Z.IL w ad w as w as w as w na c" �= E d .. d a) W alt r t t r t i r t i r i t r t i r r t i r t i t . N N N N N N N (....4 m F E .O•._ G) m y EN Z U d cn 3 3 O F H Co co co Co Co Co Co CO °...° C) a sp m co0 CVvr 0 ci MO 0) O) O N N N Zo Po 0) v .a- a a a si- N U == Z Z 0 CO co o v o Z D co - a) O ui ui a= > a N CO a) MCDU m m Z J C 7 Q 0 0 NCS v . N- r- m m co , N0. 7 N N 0) •- 2 0 0 0 O co O O N a) ` C❑ 000 O O O O 2 W O N- r N O) O) N NY CO N- COCO f-- c0 W O h O O O I- N- CD n n n n d co co co W W OD W C) O O CO CD CO (D (D C 10 0 D L w a1 a) 2 r C O co O O ul ° N O ON a) jO O O 0 0 O co y ) O C• y Ua c‘i0 0 ri 0 0 0 o 0 d d _ O D voyC _ N D CCVQ C U ` CO aD CO 0 0 CO • ` C0O O 00 N N v = co O a) • d V0 C) v v Cn (f1 (n ❑ U a) — N Co CD CD CO CD CD CD re re L aa)) 0 (ri u) u) (ri (ri CD u7 u7 O (n (n . I- 2 Z 0 0 O co o C7 co C a.) = 0) r vi N oCL O a) O' N in 0) to N- N- CV o vn v ( m o v CD r v v ui C v N CO CD r n CO CO M CD N c'7 CO C') I— CD W CO oN CO O 0) 00 N O O V' (D u7 CD - aD00 0) C- (D v v CD O O 1- csi u) N. CO co O 0) CO vt M Z CO CND O) N v CO (') v In v v co Z co 0) co uo rn a) N co co ❑ O O o o co o o o co O o 0 O 0> 00 O 0 0 N❑ O~ O O co N 01 co uD 0) CD N 00 CO CO ❑ m 2 a a= o 2 o O O O c, O co O co O coM W C) cf.) Lr) (') Q) N- ,— N a v CD CV o CD O 0) f0 O v v a Q CS R L n v CD O) Y co v o O of 0 c= O CD N )n v CO J o 0 o(No 0 Q CO W CO CO Q O CO T T O CO U T m (ru1 o u) o C C '6 v 0 v O CD E a) - U U d = r N O c0 Q O W D. O coCD L L ^ r N N N (� r ❑ N N C 0) O) a) 0 `� o m C7 E D 7 m co co f0 . A E Z a a a N co ■ M N CO sr a) (h HCN co N. O W C C C N . N C C 'C C co Mpg= o 'o 'o () E E 'o omO co CW' c . aaa @, ( �Taa co. ca o a of VdCn Oatall C N4O. 01 g gid Co m t toa 0 0 N 0) (i) a N n IO ' 0 O6 Z D N O Cl.) r), 00 C) =Z LO MN r-- ami 0.0 U @ E co 0 4 Ti N Si 'E O cL X2 ,- 120 - 0 4f• U .a C v OL a) 41 C) 2 CC O C p R d _C u C 10 '6 VU a) C u a) C O .- a) 16 o w y `a) U y O d re >, m m � ctt a) .0 C.) 0 tZ 1° J 2 Z u) 0 0 0_ a) CC O) C_ 7 I— O O O T 0 m 00 CL at d m E O m o g e aQ C) I- N CO O CD N- CO O) C.eN- I- 0_ 1 Q O) O) O CO a e- CO 0 N CON CO CO 00 C 7 CD C0 CD C) U') U) M C- N. h N O s- CD r N M O O O r (N O O N W E C` n CO CO C) C) O O O N '7 CD d M M M M M M CO + C_ O 0 O CO I,- N M , 0 n CA N- n n M Cn 16 a- C` CO CD CO CO C!) O) N- M CO N CI) C.) CO O N CO CD cD 4- N C) N c0 O) o C/) C) N- CD CO CO CC) I,- C!) N- CO N CL) CD J _ I- CO a- a- N- CO CO 0 CO CD CO 2 . a- a- N N N N N N N CO CO CO CO + a CO Q .‘- e- r CA CMD COD NCO N CO r N NCO Q u w M CO CO CO N CO CO N CA _I G VV V V' V' V' M N N CO CO (N N Q d L Co co Co Co co co Co Co CD c0 CD CO CO • 0 CO CO CO CO O 00 CO O CO CO CO cO O m U Ca m a) m E a) °r° ms 0 0 0 0 o 0 0 0 0 0 0 0 0 Q p ,n L1J N a) L 0 0 0 0 0 0 0 0 0 0 0 0 0 c = CD 0 0 0 0 0 0 0 0 0 0 CD CD N N C 3 C 't N N CD M C) C) C) O CO in O 0 7 m % C!) d = co o) N N CD c0 co W D) st CO Z0- 0- - - 0- C y 0 0 0 ,- '- '- '- '- '- CV N N M Q 011/ 22 O W m co Magi co Die >` m0 a) C) CMO cy os .. c m 0 0«) G1 y CCC s N Z Uau) 33o a U �w .. 0 Ut � — a o 1� = �� I i i I II I 1lid { I N kiW0 1 y ,c1- _8 = i - 0 n g m E - W 4 �-. mi_ g i _ N Fm - N i n N T. FF pmt I 1 t 1, 8 __ j_____ ^ C ao y . m_ N g N '-o a o W m m0 8 p o �M o a o re a m m m N N N M o p (w/8 00Z)(+) oN/(-)gnoS = g ,, _, d Li, ajE e 14 ma11 ; ; p y ego p $ N 11 Fg El Q a z.-, c 4 N - I m o ^W '.� #58888853888828 - v I` ^�" :: -mm a-- 32888888888888F._ M, o N 3 a°A o g 0 0 a a (2, 9 9`Mti',Rbb'E^BAR ' Er '?RS}g},�}g}4$$44i$ w uo ^o M zl a Q V2,,M 2m$�8�m 3Mbl _ 8 pl 03 Z5ir,353£3m'm - ,- .g5gMigligg: 4, me ^ a. CL 2SS88E;70.7RMS 4 t-§ .� �,m ;�, _ �0000N-�m m� 30 0 0000000000 00 +s 0 . 3o i oyu SL)g3daQ mopmA 311111 h W kill 1 AW0 CY 02 ■■ LI Z ■ illa gp c cp 1111111111118 i MEM__ r Jitig aiaafrMEM. — ill ems N mX8 m s� am 65 g p m d ppf 4.0 913N SN p . _. -___ _ ___._..._. _ - _.__-�_—r .-... __. --._ .....-__ m w 1 N a o t 6 . 00 '' m N< !98 �/ 0. N 9� o w coo W -'t-t_---- m m _ a m w 09 0098 ii, 95;, o z 1 ., .11 m � r, $ OOLR �6 O 9C N , 0/, 1 c IVY co hed 1Na L[98 �Y — N cO ma)q 0l ii 2 " 6 A e Ill 0. o o s98 m xri T w N Q. 8 aS • N 4,, i \ 4.,.... 4 a0 G4 4 00 ym N T. � 00 zNr _ p a O i - - a`a°`°:°-0 ■■ ■ II ME N ■■■■■ 1 I ■■■■■ _ I _ ■ ■■■■■ _ al Ad ■ II■; oel 7 � /lam■ oo co '-ii--- MMOMMEMMOROWAIMMtMli Q 9 �- 8 ^ ■■�■ ■I i • IIMIIIMIMRtl� 7 - F s � , - — F. N s s s rn rn Y Y 4 Z ? < 0 n 4 y r1 y N N N 0 (u6/8 OSI)(+)g3iow(-)91nos 1 N W ®We tea= - ���_�_v MIN'LI m W 11111 ■■ ■� ■ Z 1 ' (-4 m S a 1 ■m m AA-2g R tic. 3%Hmi I P s s A 0098 . gig p ili-psT „�m g A g 089$ `g r. 09Lg w m 3 N . a, v ry N m .-k- cz, . Opgs. / ':g3' do 0a m N 9. a 3 d M. OZ6: 8920 i €� yi$Nryer . y b 1 . • LL '�°3 3 m 6 to\ o S N b ' - 1 x 09/6 W ■ akd ■ i( ■■ A io a o46 ME 4( 1 a mlt- N Y 46 III ME g Air•rit " Ill :rg ■■■ ■ U tri I _ _.- --.-- .. _.____ N IiUiIIII-0 rsi ;11 1111111111111111111v .Q ■ ■■^ ■ (ui,j S£)(1)twoN/(-)ginos N r N 00 to F 0 0 0 0 MiiiN= a 0m333 '> 3 >> S SS S It" 0m_m<$aog$ $R _ a m N N N 4 m 9m= am!am - Umm$1mn mm mNa '2 I !" $$ 3$$$$$$$$$$$$$ §snE $.1 , ."' 2"22""7m ma6-- oSwm ii4o > £ Nm 6 ao !11Hmooamma212 mnm<d i 9 4E0?$m*.m42MR$41 O m 'W."1' w + + t ♦ 1 ♦ ! i 1 / ! + ♦ + 1 ♦ + i i t ♦ 1 + + + + ! *. W $ W4$4 ,I, aa w m S a` No �mw, nmarU > im 515402S2!50 9$ 5 0$ nan2mmmmmm�ma $Zgmm 2 ^W e o - a a0m6-i w ' m ammrrysJ o o8 : mm mmm� m$ IA2LU m Piiiii ig_ a le LL-M --_ _ m 3P !€ N .n Fligi RP.,, N 1 f ♦ ♦ + ! i 1 + 1 ♦ 1 t ♦ 1 ♦ ♦ f i i + ♦ ♦ ♦ 1 ♦ i 2€ Lx s,hi €g A9E9E5'55m2m55 il Q §, !.1„13 R88oa8oa2$8$$ !MI wRnmEgmEs o 88__ �_ Cx_ N_.mm, 2,2 e UlOOQL _ IIIIIIIIIIIIII 8 8 o o 1.111111141‘ O \ oo -N-N o o N E: , N Zrn \ NJ N mT::; ,111) C s o t2oo al id N m clq am L oC • 2 J Nil' o Df � _ 0 o ii O llir mw Wc,s L N NN aaV Om mI' _ CS= - - GN1 it3a Q m N = U M m 3 EL El; PI N CIE . N N N BAKER HUGHES INTEQ North America - ALASKA - BP Prudhoe Bay PB DS 18 18-27 18-27E Plan 2 Travelling Cylinder Report 08 August, 2012 Qbp vd BAKER Travelling Cylinder Report 0 bp INTEQ Company: North America-ALASKA-BP Local Co-ordinate Reference: Well 18-27 Project: Prudhoe Bay TVD Reference: Mean Sea Level Reference Site: PB DS 18 MD Reference: 18-27C @ 53.35ft(Nordic 1) Site Error: 0.00ft North Reference: True Reference Well: 18-27 Survey Calculation Method: Minimum Curvature Well Error: 0.00ft Output errors are at 1.00 sigma Reference Wellbore 18-27E Database: EDM.16-ANC Prod-WH24P Reference Design: Plan 2 Offset TVD Reference: Offset Datum Reference Plan 2 Filter type: GLOBAL FILTER APPLIED:All wellpaths within 200'+100/1000 of refer( Interpolation Method: MD Interval 25.00ft Error Model: ISCWSA Depth Range: 10,845.00 to 13,185.00ft Scan Method: Tray.Cylinder North Results Limited by: Maximum center-center distance of 1,514.74ft Error Surface: Elliptical Conic Survey Tool Program Date 8/8/2012 From To (ft) (ft) Survey(Wellbore) Tool Name Description 951.56 9,733.16 18-27 Srvy MWD(18-27) MWD MWD-Standard 9,830.00 10,294.09 18-27A Srvy MWD(18-27A) MWD MWD-Standard 10,294.09 10,845.00 Plan 2(18-27EPB1) MWD MWD-Standard 10,845.00 13,185.00 Plan 2(18-27E) MWD MWD-Standard Casing Points Measured Vertical Casing Hole Depth Depth Diameter Diameter (ft) (ft) Name (in) (in) 3,499.45 3,445.94 13 3/8" 13.375 16.000 9,071.45 8,207.08 9 5/8" 9.625 12.250 9,827.00 8,564.64 7" 7.000 8.500 13,185.00 8,619.91 2 7/8" 2.875 4.125 Summary Reference Offset Centre to No-Go Allowable Measured Measured Centre Distance Deviation Warning Site Name Depth Depth Distance (ft) from Plan Offset Well-Wellbore-Design (ft) (ft) (ft) (ft) Lis DS 02 L2-21 -L2-21 -L2-21 11,119.38 10,650.00 216.21 234.07 7.43 Pass-Major Risk L2-21 -L2-21A-L2-21A 11,119.38 10,650.00 216.21 234.17 7.32 Pass-Major Risk L2-21 -L2-21A-Plan#20d 11,119.38 10,650.00 216.21 233.89 7.60 Pass-Major Risk L2-25-L2-25-L2-25 Out of range PB DS 18 18-10-18-10-18-10 Out of range 18-10-18-10A-18-10A Out of range 18-10-18-10APB1 -18-10APB1 Out of range 18-10-18-10APB2-18-10APB2 Out of range 18-10-18-10B-18-10B Out of range 18-10-18-10C-18-10C Out of range 18-10-18-10CPB1 -18-10CPB1 Out of range 18-26-18-26A-18-26A 13,179.52 12,525.00 940.03 511.92 429.63 Pass-Major Risk 18-26-18-26APB1 -18-26APB1 13,075.00 11,888.00 1,482.01 474.12 1,010.87 Pass-Major Risk 18-26-18-26APB2-18-26APB2 13,112.16 12,191.00 1,242.31 488.72 756.77 Pass-Major Risk 18-27-18-27A-18-27A 11,325.00 12,025.00 1,373.31 83.03 1,293.84 Pass-Major Risk 18-27-18-27B-18-27B 11,325.00 12,025.00 1,373.31 83.07 1,293.81 Pass-Major Risk 18-27-18-27C-18-27C 11,325.00 12,025.00 1,367.31 83.07 1,287.83 Pass-Major Risk 18-27-18-27EPB1 -Plan 2 10,850.00 10,850.00 0.05 0.81 -0.76 FAIL-Major Risk CC-Min centre to center distance or covergent point,SF-min separation factor,ES-min ellipse separation 8/8/2012 2.17:36PM Page 2 of 18 COMPASS 2003.16 Build 73 Rff- 4-1116'FUG 1ELLHFAD- FUG8-2 7 1 SAFETY ES: WELLANi3LE 707 @ 9830' & CTUATOR- BAKER C90'6:1)101 04*.ORIGINAL 15-27 WELLBORE NOT 1_ELEir- 5335 Proposed CTD SidetreI:k SHOWN BELOW'7" LNR MILLOUTWINOOW@ F.ELEY- NR 98 27' (18-27A). 3P- 4MEr ax A 1 gle- 97 11065 atl m UD- NA 2L-..):: H 11-/C:1'; 1�'C1'LICO B. L-O S N,ID-3.31] Blum-ND- MUSS GAS L FT I.l4NL'REL'= ST lVt' DEQ! TYPE VLV L4TCH PORT DATE 12.L-3 0, - :349 ( 1 1 x+36 2955 1 WC CODE 1;K 16 OJ2£k+CIS LI 2 iCN 5198 28 PRI ['DUE R K 16 02Q3.1135 3 7250 6897 30 EMU ROUE RK 26 .022813. 4 31.39 7339 40 HI!_ SD RK 22 .0212E415 1f2'TIG,1216/0, L-30, 13162bp' ,ID-3.'5 H BB H 9-5.13•X4-1128k19S3P KR, D-3.875' E.:''• :;E:,:' H BAk:8? kE LNERTOP Ru.CKERID- :_r_, :?F-=.' - 3-311' BAKER DEPLOY DENT SLY, 'D-3.ED' - Min iMU rn ID = 2.37T' 0 12E 50' , • 12 H ?: NP +D- -3'3-1.2' X 2-7a8" LNR }{O l .�, :r H3112'XNPPLEID-2X ' _ E8: H t-11i'TTP, 1�.51p, L- U, D152 bpf, D-3358' r it, t:}-1 jE 34' —I _-5�i X7' 8kR ZA.P PKR,ID-6.3Y C-L'1 869 2' I 9-5. X 7'0149 FOE L NR Iia R, D-5. 5' I ----• 8699' -I 7'..::4-112'::':C{,OE ` i .J' 1 .I 0 i F 9{.0 CSG, CP, L 0, E4-3 631' H fx-17t7 j b. r 26.10NT 50-G L NR LULL[UT iU1t4CU iI I 9204' H 4-1.2' HES X NP,ID-3,813 I (13-27A) 9527.-9455E7 AAIMPSTOCKNOT St$DL P I I 1 0008 - '-12 HESX NIP, D-3.313 I P ER FO P.4TON SU1.1114 RV REF LOG_SUNS NE/IORY GRD L ON 111r0tE13 AIGLEAT173P PERF: 454@371C7 Note:Rene rt Prc4ictbk DI for Itstorlalpentdata r' 1 11480' -I 3-3/14' BAKER DEPLOYLIENTSLV,ID-3.03' SIZE SPF NTERVAL Opti1Qgz DATE P 115[14' -I 31f2'X RP PLED-XXXX 3-31:3• 5 3710-3750 I ' PROPOSED 2' 4 12770-14170 s PRC POSED 11:E:0 711D P 0 F',UHIJ'1:!CK -__ - • _ 11 ;U .Bv _ . 11739' - 10P0F2-7B' LNR,IO-2,377' 12550' -I 33J115'x27 X0 4-1J7 LNR, 12.&V,L-30, 9T, U-3355 17-2i12zE6 - HILL i ilr'UU 4U_ if ' „IMF 14:17-G y iliil' i �..}�'-.. rte' 13810' PBTD I li Z\.i- �I�° -J -,,.r: 1?'-21 3-3811 X2-7.4• LIAR, D-2277• e?,R-r,11' M. DATE REV BY C:OL11.1EN15 DATE REV BY CODUENTS PRUDM3EBAY U11< 02'23198 ORI3INA L COM PLETKJN 09/131133 CI.I.D.TLP DA TIM 1.IEVTVD& PE3RF AN=LE WELL: 18-27D 04/11198 Rl= SIEETRAC:K (13-2'A) 03!4.136 P.a,i=ITCH GLV C.O PERUtf: 11!01198 CTDS IEETRACI; (18-2'6) 04.131,O5-LDK'11H PER FS 033.31,05) API Nil: 50-029-2232 1-04 19118100 CT DS IEETRACIS (18.2'C) M./1905 1.1.E PI 3=D POSED CTD SID ETPACK SEC24,T11N,R11E.5.33 GNL&236'1UEL 11,23#U1 Cli?P CORRECTONS 06115103 CIS01fLP I.1AXA013LECORREGTON EPEtplarahon (Alai Ha) OVERSIZED DOCUMENT INSERT This file contains one or more oversized documents. These materials may be found in the original hard file or check the parent folder to view it in digital format. TRANSMITTAL LETTER CHECKLIST WELL NAME ("Y(/- 7 // Z7 E PTD# Z-I Z— IS 1 ✓ Development Service Exploratory Stratigraphic Test Non-Conventional Well �� FIELD: r�cdl�e-j / POOL: N�%C�1� -e__ 6, -i Check Box for Appropriate Letter I Paragraphs to be Included in Transmitta Letter CHECK ADD-ONS WHAT (OPTIONS) TEXT FOR APPROVAL LETTER APPLIES MULTI LATERAL The permit is for a new wellbore segment of existing well (If last two digits in Permit No. ,API No. 50- - - API number are between 60-69) Production should continue to be reported as a function of the original API number stated above. PILOT HOLE In accordance with 20 AAC 25.005(f), all records, data and logs acquired for the pilot hole must be clearly differentiated in both well name ( PH) and API number (50- - - ) from records, data and logs acquired for well . SPACING The permit is approved subject to full compliance with 20 AAC EXCEPTION 25.055. Approval to produce/inject is contingent upon issuance of a conservation order approving a spacing exception. assumes the liability of any protest to the spacing exception that may occur. DRY DITCH All dry ditch sample sets submitted to the Commission must be in SAMPLE no greater than 30' sample intervals from below the permafrost or from where samples are first caught and 10' sample intervals through target zones. Non-Conventional Please note the following special condition of this permit: Well production or production testing of coal bed methane is not allowed for (name of well) until after (Company Name) has designed and implemented a water well testing program to provide baseline data on water quality and quantity. (Company Name) must contact the Commission to obtain advance approval of such water well testing program. Rev:9/09/2011 • ❑ ❑ • CO a) o. e o am — ' a� c Q 1 c 01 °° c ID_ o o v C co: J >I t E m 0 W C0 C' to a) 0' U O C CO' -p o c 0' y d 0) y' N (E6 O ' M' a' G �� L' '0' O) O '�� o , >, m, E' 3, v r a, 4 3' • r o v `� o o. o, o �; �, o a) 3 w i o �; m; ). 0 8 O. a� o; , . , e2, �, s c • E )1Y y' c' c • 75' w, g, m > n a O co 0. p' L.u. . t O J' p 0 0 E :a Z . O o -. ' 2 U. • M n, y,13' a) �- , d �� CO, 1 0, . 0 a O a s • O C N 1s-, (CO : N Q - _ ci. • m' a `° O' C, N' �' - O. W N' O' y' y' 0 �: C 0 3 �� w .0 �� M m' co', C p N, C Q O O' 0. L' a O' 0. E 0 Tice..' M' 3' �� ,' O� N � • y, �� �, � 03 a D rn 0' Ce H y' c0 y' Q' U' a m' y' > ui CO, 4 a, y 0- CO c, }' N, C' co w C. 4 as ..' Q) 'y 0 a 'C rn E �. v' p E , s, , Q' a) m, , co rn CO d a 'a c > m c a , 0 CD' a' t ¢ m 7 0, N, C, C Ca, c, - �, N 4 p, V, m ai 0 x y, CO'�p CO' U o a a) c, •o N E. o E 4) N' , O a ab p' U U d N y T .a, fa N, • a N V' Q co C9 a' cry a �; 3 Q Z ; a, Q 40.O c a. co co m ,c M •X' t X �° m E' 1 Zc' ' cC 0 co , a > > o. a) = o) N. E' CU' ' ¢' ' N 4 a • m w LO 0 U U cn co a, 0, o i' cr a .„43' 2 2 I 0 w a • a� a .N o Q; ¢, CO), CO), CO CO, a a), aa)), CO)., a), a), a) CO, a), Q ¢' ¢ Q, Q Q. Q. m, a y). CO) aa)), CO• . Q, a• a)' CO aa)), CO), a a), aa) < o a) < < < a Z, z, }' }' }' }' }' >-: >-. >, >, }' ), }' z, z, z, Z, Z, Z. Z, >-, >- >-. >-' >-, Z, >-' >-' >- >- ), ), z z >- z z z y mO c To o a) a E 3 - E a) Z ' jk. y, LL � 7 o o o y;to N Nco o p aaa 1.0.. U � 0,. C• aID ! LI1. ' yTp ' cy, fa• C' ' , �' M' ' 0 3' 4.4 O ' 0, a), V' y' N, a) • C' p' — ' a �' 3, ce' 'G E' ' y' r O' c' m' 3' .c. -O. 4 0 7 0, 'c. a a) O CO• 0 )n, t p ` 2 N' >, 3' a), 0 C O. �, Eco' 7 ' O 'L) O 7 y m E O 'C O) Z ' D C O L' C' co,' j O �' < O y' a) N 0) .. W — O' �' C O N' C' 4' a) N. a 0 0, c (U m, p' p d L' 0' C o , w' co • op �a >, w-, .. >. v, 4 `a)) y a W c O o' a m O •M' E E 'a. C, C E, l6 E O C C to F. C O «S .y. - c, a), « m E N L a C c 0• , co.Q' 4. `O 2. 19. V ' 'O' ° co, E To* O O O O O 3 U 'a 2, a a). V, o Y, 0_-. °. a, 3 O j, (, 4 _> o D O a C' a) a) C >� O, °. V (0 f6 Y al c/0. G' O` O. N m' o �, 1p, �' y, Q' (`, �. y a O, CT O N C N E 0, p. �' a o' O' a) c o' _ Z' ' . r c 3' a`), p. y _c m' 3' v m .0)- E a Q y' 0,, §' 4 c' c B' i m L_' = a m' D -p. m' 7 C. 4 m a) m' N' v) G y' a s 3' o o' 3 c E €, m' o �' :9 m m' Ti a m 0' y 6. 3' lo' ai c m' 0' s- ° m' o rn w aa) CO' 0 o w o O Z w' ' •O. •O' ' y' y' 'l0' a) 'O f0, •3. •3. ; E' - .. .] V� U «. O .' ,,' aa� o y, 0 -, �. 0, o' 3' O =' a.' ,ti' U ao O �' a; o' o �' �' �' o' o �' �' o m E' . o ° '. Y g) o o' y' 73' E' a' @' E' t Cr) o 5' a y, c' ao' ' d) �" ai 0= .O' N' N' a' U O' 7' a C si N a 0 N a) — N �' E' 2' E�' C U' , N; " • y' cp- O C o -p re �, cLi m E co 0 o 0, Ty a y, y• , co, w 'c, rn a Of co' f6 COaa, o' m >,. . 3' 2' v' y' O' a a O co CO CO c, a a E' 3 m m ao' a�' �' 3 c c' rn p> >v 1 c Y' vi �' E ao c� �' �, c' >'•', :r IL J N' _0' C, .0 l' •O' U' N C N' a' a. a' .a L, a�j, N' •y N N, >' _c y' gy a -E. co, '-0--, 0 o U C. a C E X', aci' ao' E ar ::, a�, m, .o, a . c c . 3. m, `o; 8 CO m' �' a ai ai, .- 5 -00 P, m' a car m C o m L' w aC, 3' CO CO c� `o `o v CO a �' m c. m CO CO U c N d' o • ao, _, 0 0 0 m m m c� o. m 0' o' >. 0 3 rn o �, ar); c w w, Y 3' co'' co " 4 E N• m a Y m o, €' 0 c ' ao _ o -0 n 4 m' m co, 3' Qy o' m' �'' �', co v co o, a, = O O .c �' w 0 O m;E ca a aoi o 0 ✓ m Z, d, -I, D, �'' �' �, N w O O, 0-, d, 0, 5', Q, a, 0, cn, U, U, 0 U Q "- Q, 0 CO CO, U �' M d 0, CO, cn 0 I N M a to CO Cl. C) O .- N M A CC) CO n 0O O) O - N M Ln CO N- 00 O E ,- ,- N co--a• )f) co )` W O O N N N (V N N N N N CV M M M M M M M M M M F U N N N_ c 0 O a) O 4) G p C Cwp N 03 N R N V O Ce O 0 O G O 0 MO O) (0 W M• N CO 0)E MW O y N E J N •2 d rn o C C L O w HISS < o W 0 0 Q a