Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAbout197-0951. Operations Susp Well Insp Plug Perforations Fracture Stimulate Pull Tubing Operations shutdown
Performed: Install Whipstock Perforate Other Stimulate Alter Casing Change Approved Program
Mod Artificial Lift Perforate New Pool Repair Well Coiled Tubing Ops Other:
Development Exploratory
Stratigraphic Service 6. API Number:
7. Property Designation (Lease Number): 8. Well Name and Number:
9. Logs (List logs and submit electronic data per 20AAC25.071): 10. Field/Pool(s):
11. Present Well Condition Summary:
Total Depth measured 19,893 feet 19,000 feet
true vertical 7,944 feet 19,785 feet
Effective Depth measured 19,000 feet 9,194 feet
true vertical 7,227 feet 4,600 feet
Perforation depth Measured depth See Schematic feet
True Vertical depth See Schematic feet
Tubing (size, grade, measured and true vertical depth)4-1/2" 12.6# / L-80 / IBT 9,231' 4,608'
Packers and SSSV (type, measured and true vertical depth)NA See Above NA
12. Stimulation or cement squeeze summary: N/A
Intervals treated (measured):
Treatment descriptions including volumes used and final pressure: N/A
13a.
Prior to well operation:
Subsequent to operation:
13b. Pools active after work:Same
15. Well Class after work:
Daily Report of Well Operations Exploratory Development Service Stratigraphic
Copies of Logs and Surveys Run 16. Well Status after work: Oil Gas WDSPL
Electronic Fracture Stimulation Data GSTOR GINJ SUSP SPLUG
Sundry Number or N/A if C.O. Exempt:
Authorized Name and
Digital Signature with Date: Contact Name:
Contact Email:
Authorized Title:Wells Manager Contact Phone:
9-5/8"
Baker S-3
NA
Sr Pet Eng: Sr Pet Geo: Sr Res Eng:
WINJ WAG
0
Water-BblOil-Bbl
17. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Ryan Thompson
ryan.thompson@hilcorp.com
907-564-5005
N/A
measured
true vertical
Packer
MD
110'
Size
110'
4,623'
Length
Liner
Casing
Representative Daily Average Production or Injection Data
Casing Pressure Tubing Pressure
14. Attachments (required per 20 AAC 25.070, 25.071, & 25.283)
0
Gas-Mcf
220
02200
0 1500
150
TVD
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
REPORT OF SUNDRY WELL OPERATIONS
197-095
50-029-22770-00-00
3800 Centerpoint Dr, Suite 1400
Anchorage, AK 99503
3. Address:
Hilcorp Alaska LLC
NA
5. Permit to Drill Number:2. Operator Name 4. Well Class Before Work:
ADL0025509, ADL0355016, ADL0355017, ADL0355018
MILNE POINT / KUPARUK RIVER OIL
MILNE PT UNIT F-41
Plugs
Junk measured
measured
Conductor
19,868'
9,304'Surface
Production
Liner
20"
7"
110'
9,304'
19,868' 7,923'
5,750psi
7,240psi 5,410psi
Burst
NA
Collapse
NA
3,090psi
Form 10-404 Revised 10/2022 Due Within 30 days of Operations Submit in PDF format to aogcc.permitting@alaska.gov
By Grace Christianson at 8:41 am, Aug 20, 2024
Digitally signed by Taylor
Wellman (2143)
DN: cn=Taylor Wellman (2143)
Date: 2024.08.19 21:18:06 -
08'00'
Taylor Wellman
(2143)
RBDMS JSB 082224
WCB 10-1-2024 DSR-8/21/24
_____________________________________________________________________________________
Revised By: TDF 8/8/2018
SCHEMATIC
Milne Point Unit
Well: MPU F-41
Last Completed: 9/10/1997
PTD: 197-095
TD =19,893’(MD) / TD = 7,944’(TVD)
20”
7” Short joint f/
19,264’ to 19,306’
Orig. KB Elev.: 29.00’/ GL Elev.: 12.30’ (N 22E)
7”
2
Est. TOC @
18,000’
9-5/8”
1
3
MIN ID= 3.725”
@ 9,217’
PBTD =19,785’ (MD) / PBTD = 7,857’(TVD)
KUP A3
KUP A2
KUP A1Fish @ Unknown
Seat and ball from
shear out sub
ES Cementer
@ 2,009’
Cement Top @
19,000’
CASING DETAIL
Size Type Wt/ Grade/ Conn ID Top Btm
20" Conductor 91.1 / H-40 / N/A N/A Surface 110'
9-5/8" Surface 40 / L-80 / BTC 8.835 Surface 9,304’
7" Production 26 / L-80 / BTC 6.276 Surface 19,868’
TUBING DETAIL
4-1/2” Tubing 12.6 / L-80 / IBT 3.958 Surface 9,231’
JEWELRY DETAIL
No Depth Item
1 9,194’ 7” Baker S-3 Packer
2 9,217’ 4-1/2” XN-Nipple – 3.725” No Go
3 9,230’ 6.125” x 15” Scoop Re-entry Guide
PERFORATION DETAIL
Kuparuk Sands Top (MD) Btm (MD) Top (TVD) Btm (TVD) FT Date Status
A3 19,475’ 19,487’ 7,607’ 7,617’ 12’ 7/01/1997 Open
A2 19,495’ 19,513’ 7,623’ 7,637’ 18’ 7/01/1997 Open
A1 19,521’ 19,555’ 7,644’ 7,671’ 34’ 7/01/1997 Open
WELL INCLINATION DETAIL
KOP @ 300’
Max Hole Angle = 78.77 deg. 10,250’
Hole Angle thru perfs = 36 Deg. DLS = 0.6 Deg. / 100’
TREE & WELLHEAD
Tree 4-1/8”5M CIW
Wellhead 11” 5M FMC Gen 5
Tubing Hanger 4-1/2” FMC w/ 4.5” NS-CT Threads, 4” CIW H BPV Profile
GENERAL WELL INFO
API: 50-029-22770-00-00
Drilled and Cased by Nabors 22E - 6/07/1997
Perforated – 7/01/1997
Initial Completion by Nabors 4ES – 9/10/1997
Plug for Redrill CTU – 6/11/2018
OPEN HOLE / CEMENT DETAIL
20” 250 sx Arcticset I(Approx.) in a 24” Hole
9-5/8” 1,000 sx PF ‘E’, 993 sx ‘G’, 900 sx PF ‘E’ in a 12.25” Hole
7” 300 sx Class “G” in a 8.5” Hole
STIMULATION DETAIL
Non-Performed
MPF-41 suspended well inspection pics
Sign Frontside
Right side Backside
MPF-41 suspended well inspection pics
Left side Cellar
Backside of wellhead Right side of wellhead
MPF-41 suspended well inspection pics
Left side of wellhead TBG gauge
IA gauge OA gauge
MPF-41 suspended well inspection pics
Frontside of wellhead
MPF-41 suspended well inspection pics
Before and after cleaning Blue-Goo in cellar – addressed inspector comment from 8-3-24
regarding Blue Goo in cellar
Before Inspection
After Cleaning Blue Goo
Reviewed By:
P.I. Suprv
Comm ________
:ZϭϬͬϬϴͬϮϬϮϰ
/ŶƐƉĞĐƚEŽ͗ƐƵƐ'ϮϰϬϴϬϯϭϮϰϱϯϲ
tĞůůWƌĞƐƐƵƌĞƐ;ƉƐŝͿ͗
ĂƚĞ/ŶƐƉĞĐƚĞĚ͗ϴͬϯͬϮϬϮϰ
/ŶƐƉĞĐƚŽƌ͗'ƵLJŽŽŬ
/ĨsĞƌŝĨŝĞĚ͕,Žǁ͍KƚŚĞƌ;ƐƉĞĐŝĨLJŝŶĐŽŵŵĞŶƚƐͿ
^ƵƐƉĞŶƐŝŽŶĂƚĞ͗ϲͬϭϮͬϮϬϭϴ
η ϯϭϴͲϮϮϯ
dƵďŝŶŐ͗ϭϱϬ
/͗ϮϮϬ
K͗ϯϯϬ
KƉĞƌĂƚŽƌ͗,ŝůĐŽƌƉůĂƐŬĂ͕>>
KƉĞƌĂƚŽƌZĞƉ͗ZŽŐĞƌůůŝƐŽŶ
ĂƚĞK'EŽƚŝĨŝĞĚ͗ϴͬϭͬϮϬϮϰ
dLJƉĞŽĨ/ŶƐƉĞĐƚŝŽŶ͗^ƵďƐĞƋƵĞŶƚ
tĞůůEĂŵĞ͗D/>EWdhE/d&Ͳϰϭ
WĞƌŵŝƚEƵŵďĞƌ͗ϭϵϳϬϵϱϬ
tĞůůŚĞĂĚŽŶĚŝƚŝŽŶ
dŚĞǁĞůůŚĞĂĚŝƐŝŶŐŽŽĚƐŚĂƉĞ͕ďƵƚĂďŝƚƌƵƐƚLJ͘dŚĞǁĞůůŝƐƉƌŽƚĞĐƚĞĚďLJĂǁĞůůŚŽƵƐĞ͘dŚĞǁĞůůŝƐƐƚŝůůĐŽŶŶĞĐƚĞĚƚŽ
ĨůŽǁůŝŶĞƐ͘dŚĞƌĞǁĞƌĞŶŽůĞĂŬƐŶŽƚĞĚ͘dŚĞƌĞŝƐĂƐƵďƐƚĂŶĐĞŽŶƚŚĞĨůƵƚĞƐŽĨƚŚĞƐƵƌĨĂĐĞĐĂƐŝŶŐŚĂŶŐĞƌƚŚĂƚĂƉƉĞĂƌƐƚŽŚĂǀĞ
ƐĞĞƉĞĚƵƉĨƌŽŵƚŚĞĐŽŶĚƵĐƚŽƌ͘/ǁĂƐƚŽůĚďLJZŽŐĞƌůůŝƐŽŶƚŚĂƚŝƚŝƐΗďůƵĞŐŽŽΗ͕ďƵƚŚĞŝƐŶŽƚƐƵƌĞ͘
^ƵƌƌŽƵŶĚŝŶŐ^ƵƌĨĂĐĞŽŶĚŝƚŝŽŶ
dŚĞƌĞŝƐŐŽŽĚŐƌĂǀĞůƉĂĚƐƵƌƌŽƵŶĚŝŶŐƚŚĞǁĞůůĂŶĚǁĞůůŚŽƵƐĞǁŝƚŚŶŽŽďǀŝŽƵƐƐŝŐŶƐŽĨŚLJĚƌŽĐĂƌďŽŶƐ͘dŚĞƌĞŝƐŶŽŽďǀŝŽƵƐ
ƐŝŐŶƐŽĨƐƵďƐŝĚĞŶĐĞĂƌŽƵŶĚƚŚĞǁĞůůĞŝƚŚĞƌ͘
ŽŶĚŝƚŝŽŶŽĨĞůůĂƌ
ƐŵĂůůĂŵŽƵŶƚŽĨǁĂƚĞƌŝƐŝŶƚŚĞĐĞůůĂƌĂůŽŶŐǁŝƚŚƚŚĞΗďůƵĞŐŽŽΗƚŚĂƚŚĂƐĐŽŵĞĨƌŽŵƚŚĞĐŽŶĚƵĐƚŽƌ͘ƐŵĂůůĂŵŽƵŶƚŚĂƐ
ĚƌŽƉƉĞĚŽĨĨƚŚĞĨůƵƚĞƐŽĨƚŚĞƐƵƌĨĂĐĞĐĂƐŝŶŐŚĂŶŐĞƌĂŶĚŝƐŝŶƚŚĞƐƚĂŶĚŝŶŐǁĂƚĞƌŝŶƚŚĞĐĞůůĂƌ͘
ŽŵŵĞŶƚƐ
dŚĞůŽĐĂƚŝŽŶŽĨƚŚĞǁĞůůǁĂƐǀĞƌŝĨŝĞĚďLJĂǁĞůůƉĂĚŵĂƉ͘/ĂƐŬĞĚZŽŐĞƌůůŝƐŽŶĨŽƌƚŚĞΗďůƵĞŐŽŽΗƚŽďĞĐůĞĂŶĞĚƵƉĂŶĚĂ
ƉŝĐƚƵƌĞŽĨƚŚĞǁĞůůŚĞĂĚĂĨƚĞƌŝƚŚĂƐďĞĞŶĐůĞĂŶĞĚƵƉƚŽďĞƐĞŶƚƚŽŵĞ͘
^ƵƉĞƌǀŝƐŽƌŽŵŵĞŶƚƐ
WŚŽƚŽƐ;ϭϯͿĂƚƚĂĐŚĞĚ
^ƵƐƉĞŶƐŝŽŶƉƉƌŽǀĂů͗^ƵŶĚƌLJ
>ŽĐĂƚŝŽŶsĞƌŝĨŝĞĚ͍
KĨĨƐŚŽƌĞ͍
&ůƵŝĚŝŶĞůůĂƌ͍
tĞůůďŽƌĞŝĂŐƌĂŵǀĂŝů͍
WŚŽƚŽƐdĂŬĞŶ͍
sZWůƵŐ;ƐͿ/ŶƐƚĂůůĞĚ͍
Ws/ŶƐƚĂůůĞĚ͍
dƵĞƐĚĂLJ͕KĐƚŽďĞƌϴ͕ϮϬϮϰ
Reviewed By:
P.I. Suprv
Comm ________
:ZϭϬͬϬϴͬϮϬϮϰ
/ŶƐƉĞĐƚEŽ͗ƐƵƐ'ϮϰϬϴϬϯϭϮϰϱϯϲ
tĞůůWƌĞƐƐƵƌĞƐ;ƉƐŝͿ͗
ĂƚĞ/ŶƐƉĞĐƚĞĚ͗ϴͬϯͬϮϬϮϰ
/ŶƐƉĞĐƚŽƌ͗'ƵLJŽŽŬ
/ĨsĞƌŝĨŝĞĚ͕,Žǁ͍KƚŚĞƌ;ƐƉĞĐŝĨLJŝŶĐŽŵŵĞŶƚƐͿ
^ƵƐƉĞŶƐŝŽŶĂƚĞ͗ϲͬϭϮͬϮϬϭϴ
η ϯϭϴͲϮϮϯ
dƵďŝŶŐ͗ϭϱϬ
/͗ϮϮϬ
K͗ϯϯϬ
KƉĞƌĂƚŽƌ͗,ŝůĐŽƌƉůĂƐŬĂ͕>>
KƉĞƌĂƚŽƌZĞƉ͗ZŽŐĞƌůůŝƐŽŶ
ĂƚĞK'EŽƚŝĨŝĞĚ͗ϴͬϭͬϮϬϮϰ
dLJƉĞŽĨ/ŶƐƉĞĐƚŝŽŶ͗^ƵďƐĞƋƵĞŶƚ
tĞůůEĂŵĞ͗D/>EWdhE/d&Ͳϰϭ
WĞƌŵŝƚEƵŵďĞƌ͗ϭϵϳϬϵϱϬ
tĞůůŚĞĂĚŽŶĚŝƚŝŽŶ
dŚĞǁĞůůŚĞĂĚŝƐŝŶŐŽŽĚƐŚĂƉĞ͕ďƵƚĂďŝƚƌƵƐƚLJ͘dŚĞǁĞůůŝƐƉƌŽƚĞĐƚĞĚďLJĂǁĞůůŚŽƵƐĞ͘dŚĞǁĞůůŝƐƐƚŝůůĐŽŶŶĞĐƚĞĚƚŽ
ĨůŽǁůŝŶĞƐ͘dŚĞƌĞǁĞƌĞŶŽůĞĂŬƐŶŽƚĞĚ͘dŚĞƌĞŝƐĂƐƵďƐƚĂŶĐĞŽŶƚŚĞĨůƵƚĞƐŽĨƚŚĞƐƵƌĨĂĐĞĐĂƐŝŶŐŚĂŶŐĞƌƚŚĂƚĂƉƉĞĂƌƐƚŽŚĂǀĞ
ƐĞĞƉĞĚƵƉĨƌŽŵƚŚĞĐŽŶĚƵĐƚŽƌ͘/ǁĂƐƚŽůĚďLJZŽŐĞƌůůŝƐŽŶƚŚĂƚŝƚŝƐΗďůƵĞŐŽŽΗ͕ďƵƚŚĞŝƐŶŽƚƐƵƌĞ͘
^ƵƌƌŽƵŶĚŝŶŐ^ƵƌĨĂĐĞŽŶĚŝƚŝŽŶ
dŚĞƌĞŝƐŐŽŽĚŐƌĂǀĞůƉĂĚƐƵƌƌŽƵŶĚŝŶŐƚŚĞǁĞůůĂŶĚǁĞůůŚŽƵƐĞǁŝƚŚŶŽŽďǀŝŽƵƐƐŝŐŶƐŽĨŚLJĚƌŽĐĂƌďŽŶƐ͘dŚĞƌĞŝƐŶŽŽďǀŝŽƵƐ
ƐŝŐŶƐŽĨƐƵďƐŝĚĞŶĐĞĂƌŽƵŶĚƚŚĞǁĞůůĞŝƚŚĞƌ͘
ŽŶĚŝƚŝŽŶŽĨĞůůĂƌ
ƐŵĂůůĂŵŽƵŶƚŽĨǁĂƚĞƌŝƐŝŶƚŚĞĐĞůůĂƌĂůŽŶŐǁŝƚŚƚŚĞΗďůƵĞŐŽŽΗƚŚĂƚŚĂƐĐŽŵĞĨƌŽŵƚŚĞĐŽŶĚƵĐƚŽƌ͘ƐŵĂůůĂŵŽƵŶƚŚĂƐ
ĚƌŽƉƉĞĚŽĨĨƚŚĞĨůƵƚĞƐŽĨƚŚĞƐƵƌĨĂĐĞĐĂƐŝŶŐŚĂŶŐĞƌĂŶĚŝƐŝŶƚŚĞƐƚĂŶĚŝŶŐǁĂƚĞƌŝŶƚŚĞĐĞůůĂƌ͘
ŽŵŵĞŶƚƐ
dŚĞůŽĐĂƚŝŽŶŽĨƚŚĞǁĞůůǁĂƐǀĞƌŝĨŝĞĚďLJĂǁĞůůƉĂĚŵĂƉ͘/ĂƐŬĞĚZŽŐĞƌůůŝƐŽŶĨŽƌƚŚĞΗďůƵĞŐŽŽΗƚŽďĞĐůĞĂŶĞĚƵƉĂŶĚĂ
ƉŝĐƚƵƌĞŽĨƚŚĞǁĞůůŚĞĂĚĂĨƚĞƌŝƚŚĂƐďĞĞŶĐůĞĂŶĞĚƵƉƚŽďĞƐĞŶƚƚŽŵĞ͘
^ƵƉĞƌǀŝƐŽƌŽŵŵĞŶƚƐ
WŚŽƚŽƐ;ϭϯͿĂƚƚĂĐŚĞĚ
^ƵƐƉĞŶƐŝŽŶƉƉƌŽǀĂů͗^ƵŶĚƌLJ
>ŽĐĂƚŝŽŶsĞƌŝĨŝĞĚ͍
KĨĨƐŚŽƌĞ͍
&ůƵŝĚŝŶĞůůĂƌ͍
tĞůůďŽƌĞŝĂŐƌĂŵǀĂŝů͍
WŚŽƚŽƐdĂŬĞŶ͍
sZWůƵŐ;ƐͿ/ŶƐƚĂůůĞĚ͍
Ws/ŶƐƚĂůůĞĚ͍
dƵĞƐĚĂLJ͕KĐƚŽďĞƌϴ͕ϮϬϮϰ
9
9
9
9
9
9
9
9
9
3KRWRRIZHOOKHDGDIWHUEOXHJRRFOHDQXSLQFOXGHGMEU
2024-0803_Suspend_MPU_F-41_photos_gc
Page 1 of 7
Suspended Well Inspection – MPU F-41
PTD 1970950
AOGCC Inspection Rpt # susGDC240803124536
Photos by AOGCC Inspector G. Cook
8/3/2024
2024-0803_Suspend_MPU_F-41_photos_gc
Page 2 of 7
2024-0803_Suspend_MPU_F-41_photos_gc
Page 3 of 7
2024-0803_Suspend_MPU_F-41_photos_gc
Page 4 of 7
“Blue-Goo” released from Conductor
2024-0803_Suspend_MPU_F-41_photos_gc
Page 5 of 7
S-Riser and Flowlines connected to well Tubing Pressure
2024-0803_Suspend_MPU_F-41_photos_gc
Page 6 of 7
Tubing-Casing Annulus (IA) Pressure Casing-Casing Annulus (OA) Pressure
2024-0803_Suspend_MPU_F-41_photos_gc
Page 7 of 7
Wellhead and Cellar after
removing “Blue Goo”
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
REPORT OF SUNDRY WELL OPERATIONS
1. Operations Abandon LJ Plug Perforations LJ
Fracture Stimulate Li
Pull Tubing .Operations shutdown Li
Performed: Suspend ❑ Perforate ❑
Other Stimulate ❑
Alter Casin g ❑ Change Approved Program ❑
Plug for Redrill ❑ erforate New Pool ❑
Repair Well ❑
Re-enter Susp Well ❑ Other: Inspect Well ❑�
2. Operator
Hilcorp Alaska LLC
4. Well Class Before Work:
5. Permit to Drill Number:
Name:
Development ❑
Stratigraphic❑
Exploratory ❑
Service ❑✓
197-095
3. Address: 3800 Centerpoint Dr, Suite 1400 Anchorage,
6. API Number:
AK 99503
50-029-22770-00-00
7. Property Designation (Lease Number):
8. Well Name and Number:
ADL0355016
MILNE PT UNIT F-41
9. Logs (List logs and submit electronic and printed data per 20AAC25.071):
10. Field/Pool(s):
N/A
MILNE POINT/ KUPARUK RIVER OIL
11. Present Well Condition Summary:
Total Depth measured 19,893 feel
Plugs
measured 19,000 feet
true vertical 7,944 feet
Junk
measured 19,785 feet
Effective Depth measured 19,000 feet
Packer
measured 9,194 feet
true vertical 7,227 feet
true vertical 4,600 feet
Casing Length Size
MD
TVD Burst Collapse
Conductor 110' 20"
110'
110' N.A N/A
Surface 9,304' 9-5/8"
9,304'
4,623' 5,750psi 3,090psi
Production 19,868' 7"
19,868'
7,923' 7,240psi 5,410psi
Perforation depth Measured depth See Schematic feet
True Vertical depth See Schematic feet
Tubing (size, grade, measured and true vertical depth)
4-1/2" 12.6# / L-80 / IBT 9,231' 4,608'
Packers and SSSV (type, measured and true vertical depth)
Baker S-3
N/A See Above N/A
12. Stimulation or cement squeeze summary: N/A
Intervals treated (measured): N/A
Treatment descriptions including volumes used and final pressure:
N/A
13.
Representative Daily Average Production or Injection Data
Oil -Bbl
Gas-Mcf
Water -Bbl Casing Pressure Tubing Pressure
Prior to well operation: 0
0
0 240 140
Subsequent to operation: 0
0
0 240 140
14. Attachments (required per 20 Aa.0 25.070, 25.071, a 25.280)
15. Well Class after work:
Daily Report of Well Operations ❑Q
Exploratory❑
Development ❑ Service Q Stratigraphic ❑
Copies of Logs and Surveys Run ❑
16. Well Status after work:
Oil Gas WDSPL
Printed and Electronic Fracture Stimulation Data ❑
GSTOR ❑ WINJ
❑ WAG ❑ GINJ ❑ SUSP ❑✓ SPLUG ❑
17. 1 hereby certify that the foregoing is true and correct to the best of my knowledge.
Sundry Number or N/A if C.O. Exempt:
N/A
Zr41 a N. �
XYZ
Authorized Name: Chad Helgeson
Wyl_
Contact Name: Wyatt Rivard
Authorized Title: Operations Manager
Contact Email: Wriyard2hilcorp.com
Authorized Signature:
pat,
8/14/2019 Contact Phone: 777-8547
Lllei
4/ RBDMS �'� AUG 2 12019
Form 10-404 Revised 4/2017 ,W �17 �? Submit Original Only
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
Suspended Well Inspection Report
Date Inspected:
12- H9
Inspector:
A4" 1Y'
Well Name.
PTD No.:
Q Z "O 4 S
Location Verified?
if Veriiled,How?
aA�
Onshore 1 Offshore.
OAi 5 �e Ak
Suspension Date:
-8en
i i
Well Pressures (psi): Tubing tl A40
IA 24
OA 3 zo
of
Of {{{
ig Surface 6
-"{i7a
Actions
Operator. y ��
Oper. Rep: �'3 A14 r* -f Ong
Oper. Phone:
Oper.Email:
Date AOGCC Notified:
Type of Inspection:-s"`P46Abcb V&4."
Wellbore Diagram Avail.? GS
Photos Taken?
-
SupN
BY:
Newest Copy of Suspended Well Inspection Form - Copy
PLB 1212014
Milne Point Unit
Well: MPU F-41
SCHEMATIC Last Completed: 9/10/1997
1lilcorp Alaska, LLC PTD: 197-095
Orig. KB Elev.: 29Ad/ GL Elev.: 12.3(Y IN 22E)
IT
IJ
Lemnter
@ zaxr
@9,217
Est. TOC @
18,000
T Short joint f/
19264! to 19,306
Cement Top @
19,000
-`C° �KUP A3
.�:.KUP A2
Fy,�txuaxan KUPA1
Seat ano �If
sF�raut sub 7" .•4�
TD =19,893' (MD) /TD= 7,944(TVD)
PBTD=19,785'(MD) / PBTD = 7,957(TVD)
TREE & WELLHEAD
Tree
4-1/8"5MCIW
W ellhead
11" 5M FMC Gen 5
Tubing Hanger
4-1/2" FMC w/ 4.5" NS -CT Threads 4" CI W H BPV Profile
20"
OPEN HOLE / CEMENT DETAIL
91.1/H-40/N/A
20"
250 sx Arcticset [(Approx.) in a 24" Hole
110'
9-5/8"
9-5/S"
1,000 5'x PF'E', 993 sx'G', 900 5'x PF 'E' in a 12.25" Hole
8.835
Surface
7"
300 sx Class "G" in a 8.5" Hole
Production
CASING DETAIL
Size
Type
Wt/Grade/Conn
ID
TopBtm
7" Baker S-3 Packer
20"
Conductor
91.1/H-40/N/A
N/A
Surface
110'
9-5/8"
Surface
40/L-80/BTC
8.835
Surface
9,304'
7"
Production
26/L-80/BTC
6.276
Surface
19,868'
TUBING DETAIL
4-1/2" 1 Tubing 126/L-80/IBT 3.958 Surface 9,231'
JEWELRY DETAIL
No
Depth
Item
1
9,194'
7" Baker S-3 Packer
2
9,217'
4-1/2" XN-Nipple —3.725" No Go
3
9,230'
6.125" x 15" Scoop Re-entry Guide
WELL INCLINATION DETAIL
KOP @ 300'
Max Hole Angle = 78.77 deg. 10,250'
Hole Angle thru perfs = 36 Deg. DLS =0.6 Deg. / 100'
PERFORATION DETAIL
Kuparuk Sands
Top (MD)
Btm (MD)
Top (TVD)
Btm (TVD)
FT
I Date I
Status
A3
19,475'
1 19,487'
1 7,607' 1
7,617' 1
12'
1 7/01/1997 I
Open
A2
19,5
49
19,513'
7,623'
7,637'
18'
7/01/1997
Open
A3
19,521'
19,555'
1 7,644'
7,671' 1
34'
7/01/1997
Open
STIMULATION DETAIL
FNon -Performed
GENERAL WELL INFO
API: 50-029-22770-00-00
Drilled and Cased by Nabors 22E - 6/07/1997
Perforated — 7/01/1997
Initial Completion by Nabors 4ES — 9/10/1997
Plug for Redrill CTU — 6/11/2018
Revised By: TDF 8/8/2018
/ Aff
6/1 � ..
trf1a
n IK 2-
1
124C Kw.. llooa r Kw.. 1,p
a
' �-0 93
a
I
C N Iv Iia SA J , ��9?
99
46� 77
SR 1
621
87
88 54 69 6913
//�$+�6�i��_ ` 85 y...aT-5��:�v�1 t 65 �� }J /fie
a�F 't►^ 5a8S �g4j?.JS X346
r IK5 :�,p /t ll
3
}�w 666 e��":�'� 45= t��pI'.
9081 1122�I�IF. *�t 341
�..
lip
" 9
23
.1IT ill
2t
I.
os N��1 su
21
Vo i.� building � 1]
q
5
i,'� 035 pn tor s
Old ESIP'
�s
IlHilcorp Alaska, LLC
MILNE POINT UNIT
!1111h
MPU F PAD
LOCATION MAP
2S;fhtffi
'1w, e:!
Map D.teMapquthor: p
No .Mr2018 MF Mtl ., Ma ]oH0
Suspended Well Inspection Review Report
InspectNo: susBDB190805065046
Date Inspected: 8/1/2019
Inspector: Brian Bixby
Well Name:
MILNE PT UNIT F-41
Permit Number:
1970950
Suspension Approval:
Completion Report '
Suspension Date:
6/12/2018
Location Verified?
d❑
If Verified, How?
Other (specify in comments)
Offshore?
❑
Type of Inspection: Initial
Date AOGCC Notified: 7/31/2019
Operator: Hilcorp Alaska LLC
Operator Rep: Matt Linder
Wellbore Diagram Avail? ❑D
Photos Taken? ❑D '
Well Pressures (psi): Tubing:
140 Fluid in Cellar?
❑
-- IA:
240 BPV Installed?
❑
OA:
320 VR Plug(s) Installed?
❑
Wellhead Condition
Good
Condition of Cellar
Good
Surrounding Surface Condition
Good
Comments
Location verified by Bell Survey As Built pad map.
Supervisor Comments
Photos(3)attached
6 w- ro�0<\n
Wednesday, August 14, 2019
Suspended Well Inspection — MPU F-41
PTD 1970950
AOGCC Inspection Report # susBDB190805065046
Photos by AOGCC Inspector B. Bixby
2019-0801_ Suspend_MPU _F-41 _photos_bb.docx
Pagel of 2
2019-0801 _Suspend_MPU_F-41 _photos_bb.docx
Page 2 of 2
THE STA. • Alaska Oil and Gas
of ' Conserv. tion mmissi®n
LAsKA
54}� _ 333 West Seventh Avenue
.11F. GOVERNOR BILL WALKER Anchorage, Alaska 99501-3572
Main: 907.279.1433
of ALASY'� Fax: 907.276.7542
www.aogcc.alaska.gov
Bo York %Amp JUN 0,8 2018
Operations Manager
Hilcorp Alaska, LLC.
3 800 Centerpoint Drive, Suite 1400
Anchorage,AK 99503
Re: Milne Point Field, Kuparuk River Oil Pool, MPU F-41
Permit to Drill Number: 197-095
Sundry Number: 318-223
Dear Mr. York:
Enclosed is the approved application for the sundry approval relating to the above referenced well.
Please note the conditions of approval set out in the enclosed form.
As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further
time as the AOGCC grants for good cause shown,a person affected by it may file with the AOGCC
an application for reconsideration. A request for reconsideration is considered timely if it is
received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if
the 23rd day falls on a holiday or weekend.
Sincerely,
Hollis S. French
Chair
DATED this 5 day of June,2018.
RBDMSF\JUN 0 7 2018
• 0 • F77 1 i . ' '.
MAY 3 0 :018
STATE OF ALASKA (o •S
ALASKA OIL AND GAS CONSERVATION COMMISSION u G C
APPLICATION FOR SUNDRY APPROVALS
20 AAC 25.280
1.Type of Request: Abandon ❑ Plug Perforations I . Fracture Stimulate ❑ Repair Well ❑ Operations shutdown❑
Suspend ❑ Perforate ❑ Other Stimulate ❑ Pull Tubing ❑ Change Approved Program❑
Plug for Redrill R Perforate New Pool ❑ Re-enter Susp Well ❑ Alter Casing ❑ Other: ESP Change-cut ❑
l
2.Operator Name: 4.Current Well Class: 5.Permit to Drill Number:
Hilcorp Alaska LLC Exploratory ❑ Development ❑ 197-095 •
3.Address: 3800 Centerpoint Dr,Suite 14006.API Number:
Stratigraphic ❑ Service Q .
Anchorage Alaska 99503 50-029-22770-00-00 '
7.If perforating: 8.Well Name and Number:
What Regulation or Conservation Order governs well spacing in this pool? C.O.432D
Will planned perforations require a spacing exception? Yes ❑ No LI MILNE PT UNIT F-41 •
9.Property Designation(Lease Number): 10.Field/Pool(s):
ADL0355016 • MILNE POINT/KUPARUK RIVER OIL •
11. PRESENT WELL CONDITION SUMMARY
Total Depth MD(ft): Total Depth TVD(ft): Effective Depth MD: Effective Depth TVD: MPSP(psi): Plugs(MD): Junk(MD):
19,893' - 7,944' . 19,785' 7,857' 2,962 N/A 19,785'
Casing Length Size MD TVD Burst Collapse
Conductor 110' 20" 110' 110' N.A N/A
Surface 9,304' 9-5/8" 9,304' 4,623' 5,750psi 3,090psi
Production 19,868' 7" 19,868' 7,923' 7,240psi 5,410psi
Perforation Depth MD(ft): Perforation Depth TVD(ft): Tubing Size: Tubing Grade: Tubing MD(ft):
See Schematic See Schematic 4-1/2" 12.6#/L-80/IBT 9,231'
Packers and SSSV Type: Packers and SSSV MD(ft)and TVD(ft):
Baker S-3 Packer and N/A 9,194MD/4,600TVD and N/A
12.Attachments: Proposal Summary Q Wellbore schematic Q 13.Well Class after proposed work:
Detailed Operations Program ❑ BOP Sketch ❑Q Exploratory ❑ Stratigraphic
❑ Development❑ Service Q
14.Estimated Date for 15.Well Status after proposed work:
Commencing Operations: 6/3/2018 OIL
❑ WINJ ❑ WDSPL ❑ Suspended 0
16.Verbal Approval: Date: (;, f._/c1 GAS ❑ WAGIN ❑ GSTOR ❑ SPLUG El
Commission Representative: C--)„,,„, SII.....,...)-J.-v-4-2-- GINJ ❑ Op Shutdown ❑ Abandoned ❑
17. I hereby certify that the foregoing i true and the procedure approved herein will not
be deviated from without prior written approval.
Authorized Name: Bo York Contact Name: Stan Porhola STP
Authorized Title: Operations Manager Contact Email: sporhola@hilcorp.com
2 Contact Phone: 777-8412
Authorized Signature: ' Date: ✓ Zp tq
COMMISSIONSE ONLY
Conditions of approval: Notify Commission so that a representative may witness Sundry Number: n lr1 ^„
Plug Integrity BOP Test Mechanical Integrity Test ❑ Location Clearance ❑ lhJ UX �///
Q(
Other: 4 3500 ,?$ 8z'e /TS--
Post Initial Injection MIT Req'd? Yet ❑ No ❑
Spacing Exception Required? Yes ❑ No f Subsequent Form Required: , b cf 0
Lg-206.___\.._ APPROVED BY al S
Approved by: COMMISSIONER THE COMMISSION Date: Ile,
RBDMS- JUN 0 7 2018
zt.*10 7Z s-3.:-(P ORIGINAL ter ! .p
Submit Form and
Form 10-403 Revised 4/2017 Approved application is valid for 12 months from the date of approval. Attachments in Duplicate
Well Prognosis
Well: MPU F-41
1Ii!cora Alaska,Lb
Date:5/29/2018
Well Name: MPU F-41 API Number: 50-029-22770-00
Current Status: SI Injector Pad: F-Pad
Estimated Start Date: June 3'd, 2018 Rig: Coil
Reg.Approval Req'd? Yes Date Reg.Approval Rec'vd:
Regulatory Contact: Tom Fouts Permit to Drill Number: 197-095
First Call Engineer: Stan Porhola (907) 777-8412 (0) (907) 331-8228 (M)
Second Call Engineer: Paul Chan (907) 777-8333 (0) (907)444-2881 (M)
AFE Number _ Job Type: _ PluOack for Sidetrack
Current Bottom Hole Pressure: 3,662 psi 7,000' TVD (Offset BHP measured in F-49 on
p @ 8/28/2014)
Maximum Expected BHP: 3,662 psi @ 7,000' TVD (No new perfs being added)
MPSP: 2,962 psi (0.10 psi/ft gas gradient)
Brief Well Summary:
MPU F-41 was drilled with Nabors 22E as an injector in the Kuparuk A sands in 1997. The original
completion was ran in September 1997 using Nabors 4ES running the tubing/packer completion. The well last
injected in May 2005.The well currently has an ice plug at 1,470' MD.
Notes Regarding Wellbore Condition
• Well has not injected since 2001.
• Ice plug in tubing at 1,470' MD.
• Tubing tail located +10,000' MD above perfs.
Objective:
/
The purpose of this work/sundry is to plugback the well, isolating the open perfs. A separate sundry will be
submitted for a drilling rig to cut and pull the tubing and sidetrack the well.
e.
174
Work Procedure:
ft'La -d
Coiled Tubing Procedure:
1. MIRU Coiled Tubing Unit and spot ancillary equipment. Fill source tank w/8.5 ppg Produced Water.
2. Pressure test BOPE to 3,500 psi Hi 250 Low, 10 min Hi, 5 min Low each test.
a. Each subsequent test of the lubricator will be to 3,500 psi Hi 250 Low to confirm no leaks.
b. No AOGCC notification required.
c. Record BOPE test results on 10-424 form.
3. RIH w/1.75" coil w/2.0"to 3.5" max OD cleanout BHA to ice plug at 1,470' and thaw out ice plug.
4. Continue to RIH to tubing tail @ 9,230' MD and cleanout tubing. POOH w/coil.
5. Notify AOGCC inspector at least 24 hours before cement plugging operations.
6. RIH w/1.75" coil w/extended reach BHA and RIH to+/- 19,555' or as deep as possible.
• Well Prognosis
Well: MPU F-41
Ililcon'Alaska,LL'
Date:5/29/2018
7. Lay in cement plug from base of perfs to 100' above top perfs to 19,375' MD. Plan to pump a total of
30 bbl and squeeze away 5 bbls of cement, leaving 25 bbl (which is 9.3 bbl above capacity) in the casing
(Casing Capacity from 19,785'—19,375' =410' @ 0.0382 bbl/ft= 15.7 bbl).
a. Note: BHT @ perfs= 200° F.
8. Contingency: If unable to reach perfs, bullhead cement into perfs. Estimated volume to pump is+/-35
bbl, squeezing+/-5 bbl of cement into the perfs while leaving 30 bbl (which is 7.8 bbl above capacity)
in the casing, with the estimated cement top no lower than +/- 18,975' MD. (Casing Capacity from
19,555'—18,975' =580' @ 0.0382 bbl/ft=22.2 bbl). /10
9. POOH.Wait on cement minimum of 12 hours.
10. RIH and tag cement top. If cement top is below desired depth, repeat either Step#6 or Step#7. •
11. POOH.Wait on cement minimum of 12 hours.
12. RIH and tag cement top. If cement top is below desired depth, repeat either Step#6 or Step#7 again.
a. Note: If layed in cement plugs or bullheaded plugs do not hold, plan to PU inflatable cement .
retainer. — ,(�z�� i—t' # Z4`, ' /? .� /ate
13. Contingency: PU 3-3/8" inflatable cement retainer and RIH to+/- 18,975' MD.
a. Mix 30 bbl of 15.8 ppg cement.
b. Set retainer and squeeze away 25 bbl of cement below the retainer.
c. Unsting from retainer and lay in 5 bbl of cement above the retainer.
14. PU to 2,500' and freeze protect well. POOH w/coil.
15. RD Coiled Tubing and ancillary equipment.
16. Turn well over to production.
41. Petele
Attachments: —�� L ) �I
1. As-built Schematic
2. Proposed Schematic
3. Coil BOPE Schematic
• Milne Point Unit
II . Well: MPU F-41
SCHEMATIC Last Completed: 9/10/1997
Ililcorp Alaska,LLC PTD: 197-095
Orig.KB Elev.:29.00'/GL Elev.:12.30'(N 22E) TREE&WELLHEAD
Tree 4-1/8"5M CIW
Wellhead 11" 5M FMC Gen 5
20'-i 1 ,t
'! Tubing Hanger 4-1/2"FMC w/4.5"NS-CT Threads,4"CIW H BPV Profile
OPEN HOLE/CEMENT DETAIL
20" 250 sx Arcticset I(Approx.)in a 24"Hole
0 (' 9-5/8" 1,000 sx PF'E',993 sx'G',900 sx PF'E'in a 12.25"Hole
ES Cementer s;F 7" 300 sx Class"G"in a 8.5"Hole
@ 2,0179' I,
til , CASING DETAIL
Size Type Wt/Grade/Conn ID Top Btm
20" Conductor 91.1/H-40/N/A N/A Surface 110'
W 9-5/8" Surface 40/L-80/BTC 8.835 Surface 9,304'
7" Production 26/L-80/BTC 6.276 Surface 19,868'
TUBING DETAIL
;. 4-1/2" Tubing 12.6/L-80/IBT 3.958 Surface 9,231'
lLiAlt
_14,:_ , 1 JEWELRY DETAIL
No Depth Item
te 1 9,194' 7"Baker S-3 Packer
- 2 2 9,217' 4-1/2"XN-Nipple—3.725"No Go
1 3 9,230' 6.125"x 15"Scoop Re-entry Guide
r;
3
9-5/8" tee,
WELL INCLINATION DETAIL
MIN Ilk 3.725" ,
@9,217 KOP @ 300'
Max Hole Angle=78.77 deg. 10,250'
Hole Angle thru perfs=36 Deg.DLS=0.6 Deg./100'
PERFORATION DETAIL
Kuparuk Sands Top(MD) Btm(MD) Top(ND) Btm(ND) FT Date Status
A3 19,475' 19,487' 7,607' 7,617' 12' 7/01/1997 Open
A2 19,495' 19,513' 7,623' 7,637' 18' 7/01/1997 Open
Al 19,521' 19,555' 7,644' 7,671' 34' 7/01/1997 Open
Est.TOC@ STIMULATION DETAIL
18,000
Non-Performed
GENERAL WELL INFO
API:50-029-22770-00-00
Drilled and Cased by Nabors 22E -6/07/1997
Perforated—7/01/1997
Initial Completion by Nabors 4ES—9/10/1997
7'Short joint f/ 1
19,264'to 19,306'
— KUP A3
.KUP A2
Fish @Unknosm , KUPA1
Seat and ball from 4_
shear out sub 7„°a,-
TD=19,893'(MD)/TD=7,944'(1VD)
PBTD=19,785'(MD)/PBTD=7,857'(TVD)
Revised By:STP 5/29/2018
II . IllMilnePoint Unit
Well: MPU F-41
PROPOSED Last Completed: 9/10/1997
IIilcorp Alaska,LLC PTD: 197-095
Orig.KB Elev.:29.00'/GL Elev.:12.30'(N 22E) TREE&WELLHEAD
Tree 4-1/8"5M CIW
Wellhead 11" 5M FMC Gen 5
20 1* [ilk
Tubing Hanger 4-1/2"FMC w/4.5"NS-CT Threads,4"CIW H BPV Profile
`' ' OPEN HOLE/CEMENT DETAIL
20" 250 sx Arcticset I(Approx.)in a 24"Hole
0 9-5/8" 1,000 sx PF'E',993 sx'G',900 sx PF'E'in a 12.25"Hole
FS Cementer 3 '}✓ 7" 300 sx Class"G"in a 8.5"Hole
@ 2,009' ° 4
CASING DETAIL
Size Type Wt/Grade/Conn ID Top Btm
to 20" Conductor 91.1/H-40/N/A N/A Surface 110'
°I' 9-5/8" Surface 40/L-80/BTC 8.835 Surface 9,304'
`° ,, 7" Production 26/L-80/BTC 6.276 Surface 19,868'
s
TUBING DETAIL
V 4-1/2" Tubing 12.6/1-80/IBT 3.958 Surface 9,231'
wt
1 JEWELRY DETAIL
i,. No Depth Item
a* 1 9,194' 7"BakerS-3 Packer
2 2 9,217' 4-1/2"XN-Nipple—3.725"No Go
3 9,230' 6.125"x 15"Scoop Re-entry Guide
4 MI 3
9-5/8"tillI
WELL INCLINATION DETAIL
MIN Ilk 3.725"
@9217 KOP @ 300'
Max Hole Angle=78.77 deg. 10,250'
Hole Angle thru perfs=36 Deg.DLS=0.6 Deg./100'
PERFORATION DETAIL
Kuparuk Sands Top(MD) Btm(MD) Top(ND) Btm(TVD) FT Date Status
A3 19,475' 19,487' 7,607' 7,617' 12' 7/01/1997 Open
A2 19,495' 19,513' 7,623' 7,637' 18' 7/01/1997 Open
Al 19,521' 19,555' 7,644' 7,671' 34' 7/01/1997 Open
Est TOC @m a, STIMULATION DETAIL
18,003'
t, g Non-Performed
tA
0 ti
GENERAL WELL INFO
API:50-029-22770-00-00
e Drilled and Cased by Nabors 22E -6/07/1997
Perforated—7/01/1997
k TC 4.....„,..)--. Initial Completion by Nabors 4ES—9/10/1997
7'Start joint f/ Cement Top: V t. '/ �,✓°i `y
19,264'to 19,306 18 975 or I GMK (
19,375' IV
pp
;1M KUP A3
— r KUP A2
' *' KUPA1
Fish @ LhkrxxTnn 4,,..t,,,i, -
Seat and ball from ' ,'
shear out sub 7"iii'
TD=19,893'(MD)/TD=7,944'(TVD)
PBTD=19,785'(MD)/PBTD=7,857'(WD)
Revised By:STP 5/29/2018
II 4.
0
MILNE POINT UNIT
COIL BOPE MPU F-41
Hilcorp Ala.•ka,LLC 5/29/2018
MPU F-41
20X9% X7X4/2
Coil Tubing BOP
Lubricator to injection
head
$ 0 1
(11111
2.00"Single Stripper
I I
• 1/16 10 !:Bhmn
® ---
c= Blind/Shear d/Shear :
1•',I, Blind/Shear ��Blind/Shear.,' 41•
- ME 1
OO -a41
0* P
Slie= � Slip Oh
�
JIi.
P5ipe E air Pipe ,I,'•
01
i,i ai l
iI =D
Crossover spool
4 1/16 10M X 4 1/16 5M
sus
Pump-In Sub lc,
{.,
4 1/16 5M {• ° l3 ii .1 1502 Union
Manual Gate Manual Gate
io'l o
Valve,Swab,WKM-M, 2 1/8 5M 2 1/8 8 5M
4 1/16 5M FE t
,
7cc
1•11111111:1111141.111111 0 C.5
(
W. ■
ji: i
\.
A
/
Valve,Upper Master,Baker,
4 1/16 5M FE,w/Hydraulic
t .
Valve,Lower Master,WKM-M, 161-.0-\`:,
41/165MFE
illiiiill,01.111t1 ell
Tubing Adapter,4 1/16 5M ��� -
•
•
Schwartz, Guy L (DOA)
From: Stan Porhola <sporhola@hilcorp.com>
Sent: Tuesday,June 05, 2018 1:20 PM
To: Schwartz,Guy L(DOA)
Subject: RE: Requesting verbal approval for MPU F-41 (PTD 197-095) Coil Tubing Procedure
They are in a separate email I sent last Thursday.
Here is the basic procedure for the rig for the sidetrack:
1.) MIRU E-line and Cut the 4-1/2"tubing at+/-4,000' MD. RDMO E-line.
2.) MIRU the Innovation Rig.Test BOPE.
3.) Pull 4-1/2"tubing from+/-4,000' MD.
4.) Cut 7" casing at+/-4,000' MD.
5.) Pull 7" casing at+/-4,000' MD. 1
6.) RIH w/9-5/8"cleanout assembly to casing stub at+/-4,000' MD.
7.) RIH w/E-line and set a 9-5/8"CIBP above the casing stub. '7 /
8.) RIH w/whipstock and set on top of CIBP.
9.) Mill window at+/-4,000'MD.
Stan
Original Message
From:Schwartz,Guy I(DOA) [mailto:guy.schwartz@alaska.gov]
Sent: Monday,June 04,2018 8:14 AM
To:Stan Porhola<sporhola@hilcorp.com>
Subject: RE: Requesting verbal approval for MPU F-41(PTD 197-095)Coil Tubing Procedure
Don't forget the rig steps so I can finish up the sundry.
Guy Schwartz
Sr. Petroleum Engineer
AOGCC
907-301-4533 cell
907-793-1226 office
CONFIDENTIALITY NOTICE:This e-mail message, including any attachments,contains information from the Alaska Oil
and Gas Conservation Commission (AOGCC),State of Alaska and is for the sole use of the intended recipient(s). It may
contain confidential and/or privileged information.The unauthorized review, use or disclosure of such information may
violate state or federal law. If you are an unintended recipient of this e-mail, please delete it,without first saving or
forwarding it,and,so that the AOGCC is aware of the mistake in sending it to you,contact Guy Schwartz at(907-793-
1226)or(Guy.schwartz@alaska.gov).
Original Message
From:Stan Porhola [mailto:sporhola@hilcorp.comj
Sent: Friday,June 01,2018 2:16 PM
To:Schwartz,Guy L(DOA)<guy.schwartz@alaska.gov>
Subject: Re: Requesting verbal approval for MPU F-41(PTD 197-095)Coil Tubing Procedure
1
•
Thanks,Guy. •
Will keep you posted.
Stan Porhola
Operations Engineer
On Jun 1,2018,at 2:13 PM,Schwartz,Guy L(DOA)<guy.schwartz@alaska.gov<mailto:guy.schwartz@alaska.gov»
wrote:
Stan,
Verbal approval granted for plugging well using CT as proposed in your sundry application. The cement plug must be
tagged as well as pressure tested to 2000 psi for 30 min.
Regarding the BOPE test waiver: a full BOPE test is not required if work is completed within the one week testing
window. SWS will need to do a function test of rams/BOP as normal prejob SOP.
Regards, I
Guy Schwartz
AOGCC
Sent from my iPhone
On Jun 1, 2018,at 12:54 PM,Stan Porhola<sporhola@hilcorp.com<mailto:sporhola@hilcorp.com»wrote:
Guy,
Requesting verbal approval for the sundry submittal of MPU F-41 (PTD 197-095)for the coil tubing procedure(Steps#1-
#16).
We are making this verbal request for a few different reasons:
1.) As part of our Innovation Rig schedule,we had a gap between already planned drill wells at Milne Point[currentlY
on MPU C-47(PTD 217-077)] and work out at Endicott that cannot start until after July 5th due to barging logistics.W(
identified a sidetrack of MPU F-41 as the best candidate for this gap in our rig schedule.We have also evaluated other
rig workovers and potentially idling the rig.We made the decision to add this sidetrack of MPU F-41 as one of the best
projects amongst the other projects and did not wish to idle the rig at this time in fear of losing rig crews and the addad
expense of shutting down and reactivating a rig.This well was identified between early to mid-May 2018.The planned
sidetrack is toward the end of June 2018.
2.) In preparation of the rig sidetracking operations,we identified the need to plugback the existing perfs.We
determined the best tool for the job was coil tubing. However,the only coil unit with a long enough string to potentially
g
n o hilli s.We were able)to
er er s CTU#14,currentlyworkingfor Co oc P
reach these perfs that was available was Schlumb g p
secure this unit, but for only a limited time.The unit became available on May 29th and we currently have the unit doing
non-sundried coil work at Milne.
As part of this request,we would like to formally request to not do a full BOPE test for MPU F-41,as we performed a full
BOPE test on May 31,2018(documentation is available if requested)while doing non-sundried work on MPU F-86(PTD
201-087).The request would be to not do a full BOPE test until required after 1 week of operations(which we do not
anticipate our work to last this long but could if we have delays).Therefore,the next weekly BOPE test would be on 10e
7th.
2
•
•
Let me know if you have any questions.
Regards,
Stan Porhola I Operations Engineer
North Slope Asset Team
Hilcorp Alaska, LLC
sporhola@hilcorp.com<mailto:sporhola@hilcorp.com>
Office: (907)777-8412
Mobile: (907)331-8228
I,III �I
III
3
•
•
Schwartz, Guy L (DOA)
From: Stan Porhola <sporhola@hilcorp.com>
Sent: Thursday, May 31, 2018 4:11 PM
To: Roby, David S(DOA);Schwartz, Guy L(DOA)
Subject: RE: F-41 PLug for redrill
Dave,
MPU F-41 (PTD 197-095) is located in the 7F Hydraulic Unit of the Kuparuk reservoir of Milne Point and only supports
MPU F-57A(PTD 203-167). However,this well is located over 5,000 feet away from the injector and little to no support is
seen at the producer. Also,the injector is located in the aquifer, limiting its usefulness as an injector.
There is a fault that bifurcates the 7F Hydraulic Unit that isolates this well from other offset producers.
Let me know if you need any additional information.
Stan
From: Roby, David S(DOA) [mailto:dave.roby@alaska.govj
Sent:Thursday, May 31,2018 2:54 PM
To:Schwartz,Guy L(DOA)<guy.schwartz@alaska.gov>;Stan Porhola<sporhola@hilcorp.com>
Subject: RE: F-41 PLug for redrill
Stan,
Also please include a little discussion on why this well is no longer needed as in injector at its current location. I know it
hasn't injected in over a decade but I can't find anything in out records as to why it was shutin,other than in the annu*l
shutin wells report saying it is shut in for reservoir management.
Thanks,
Dave Roby
(907) 793-1232
CONFIDENTIALITY NOTICE:This e-mail message,including any attachments,contains information from the Alaska Oil and Gas Conservation
Commission (AOGCC),State of Alaska and is for the sole use of the intended recipient(s).It may contain confidential and/or privileged
information.The unauthorized review,use or disclosure of such information may violate state or federal law.If you are an unintended
recipient of this e-mail,please delete if,without first saving or forwarding it,and,so that the AOGCC is aware of the mistake in sending it}o
you,contact Dave Roby at(907)793-1232 or dave.roby@alaska.gov.
From:Schwartz,Guy L(DOA)
Sent:Thursday, May 31,2018 2:46 PM
To:Stan Porhola<sporhola@hilcorp.com>
Cc: Roby, David S(DOA)<dave.roby@alaska.gov>
Subject: F-41 PLug for redrill
Stan,
For plugging a well for a sidetrack the box"Plug for redrill "should be checked off. This promps Dave Roby to do a
reserves assessment before authorizing the sidetrack. Do not check the box"plug perforations"for wells that are
intended to be permanently abandoned. ...
1
•
I _.
•
• •
Also, in this case the sundry should also include the basic rig steps up until the window is milled to start the
sidetrack. You can email me a procedure and I can append it to this sundry.
Guy Schwartz
Sr. Petroleum Engineer
AOGCC
907-301-4533 cell
907-793-1226 office
CONFIDENTIALITY NOTICE:This e-mail message,including any attachments,contains information from the Alaska Oil and Gas Conservati n
Commission(AOGCC),State of Alaska and is for the sole use of the intended recipient(s),It may contain confidential and/or privileged
information.The unauthorized review,use or disclosure of such information may violate state or federal law.If you are an unintended
recipient of this e-mail,please delete it,without first saving or forwarding it,and,so that the AOGCC is aware of the mistake in sending it to
you,contact Guy Schwartz at(907-793-1226) or(Guy.schwartz@alaska.gov).
2
Pages NOT Scanned in this Well History File
XHVZE
This page identifies those items that were not scanned during the initial scanning project.
They are available in the original file and viewable by direct inspection.
~.. ~_~ File Number of Well History File
PAGES TO DELETE
Complete
RESCAN
Color items - Pages:
GraYScale, halftones, pictures, graphs, charts -
Pages:
Poor Quality Original- Pages:
Other- Pages:
DIGITAL DATA
[] Diskettes, No.
Other, No/Type
'OVERSIZED
.Logs of vadous kinds
Other
COMMENTS:
Scanned b~-~ildred. D'aretha
Nathan Lowell
TO RE-SCAN
Notes:
Re-Scanned by: Bevedy Mildred Daretha Nathan Lowell Date: /si
• •
bp
BP Exploration (Alaska) Inc.
Attn: Well Integrity Coordinator, PRB -20
Post Office Box 196612
Anchorage, Alaska 99519 -6612
December 30, 2011
1
Mr. Tom Maunder J f 1
Alaska Oil and Gas Conservation Commission '/�/� P '"Y
333 West 7 Avenue
Anchorage, Alaska 99501
Subject: Corrosion Inhibitor Treatments of MPF -Pad
Dear Mr. Maunder,
Enclosed please find multiple copies of a spreadsheet with a list of wells from MPF -Pad
that were treated with corrosion inhibitor in the surface casing by conductor annulus.
The corrosion inhibitor is engineered to prevent water from entering the annular space
and causing external corrosion that could result in a surface casing leak to atmosphere.
The attached spreadsheet represents the well name, API and PTD numbers, top of
cement depth prior to filling and volumes of corrosion inhibitor used in each conductor.
As per previous agreement with the AOGCC, this letter and spreadsheet serve as
notification that the treatments took place and meet the requirements of form 10 -404,
Report of Sundry Operations.
If you require any additional information, please contact me or my alternate, Gerald
Murphy, at 659 -5102.
Sincerely,
Mehreen Vazir
BPXA, Well Integrity Coordinator
. 0
1
BP Exploration (Alaska) Inc.
Surface Casing by Conductor Annulus Cement, Corrosion inhibitor, Sealant Top-off
Report of Sundry Operations (10 -404)
MPF -Pad
10/29/2011
Corrosion
Initial top of Final top of Cement top off Corrosion inhibitor/
Well Name PTO # API # cement Vol. of cement pumped cement date inhibitor sealant date
ft bbls ft gal
MPF -01 1950450 50029225520000 10.2 N/A 102 N/A 122.4 8/7/2011
MPF-02 1960700 50029226730000 4 N/A 4 N/A 35.7 8/8/2011
MPF-05 1970740 50029227620000 1.3 N/A 1.3 N/A 13.6 8/9/2011
MPF-06 1960020 50029226390000 1.2 N/A 12 N/A 15.3 8/2/2011
MPF-09 1971040 50029227730000 5.0 N/A 5.0 N/A 54.4 8/9/2011
MPF -10 1960940 50029226790000 1.7 N/A 1.7 N/A 20.4 8/2/2011
MPF -13 1950270 50029225490000 0.2 N/A 02 N/A 8.5 10/6/2011
MPF -14 1952120 50029226360000 0.1 N/A 0.1 N/A 8.5 10/6/2011
MPF -17 1971960 50029228230000 4.1 N/A 4.1 N/A 37.4 8/6/2011
MPF -18 1961000 50029226810000 8.3 N/A 8.3 N/A 91.8 8/2/2011
MPF -21 1961350 50029226940000 1.8 N/A 1.8 N/A 15.3 8/6/2011
MPF -22 1952010 50029226320000 4 N/A 4 N/A 13.6 8/1/2011
MPF -25 1950160 50029225460000 0.3 N/A 0.3 N/A 6.8 10/29/2011
MPF -26 1970840 50029227670000 1.8 N/A 1.8 N/A 11.9 8/1/2011
MPF -29 1961170 50029226880000 6.7 N/A 6.7 N/A 56.1 8/9/2011
MPF -30 1951840 50029226230000 0.8 N/A 0.8 N/A 6.8 8/1/2011
MPF -33 2010620 50029226890000 23 Need top job
MPF -34 1971970 50029228240000 4.1 N/A 4.1 N/A 13.6 8/1/2011
MPF-37 1950250 50029225480000 0.2 N/A 02 N/A 8.5 10/6/2011
MPF-38 1951680 50029226140000 0.3 N/A 0.3 N/A 6.8 10/5/2011
---- MPF-41 1970950 50029227700000 0.8 N/A 0.8 N/A 8.5 8/9/2011
MPF-42 1970200 50029227410000 1.8 N/A 13 N/A 13.6 8/1/2011
MPF-45 1950580 50029225560000 8 N/A 8 N/A 78.2 8/112011
MPF-46 1940270 50029224500000 Sealed Conductor N/A N/A N/A N/A N/A
MPF-49 1970030 50029227320000 2.3 N/A 2.3 N/A 18.7 8/11/2011
MPF -50 1970580 50029227560000 1.7 N/A 1.7 N/A 6.8 7/31/2011
MPF -53 1951080 50029225780000 2.8 N/A 2.8 N/A 11.9 9/19/2011
MPF -54 1961920 50029227260000 1.7 N/A 1.7 N/A 10.2 8/12011
MPF -57A 2031670 50029227470100 1.3 N/A 1.3 N/A 13.6 8/11/2011
MPF -58 1961560 50029227060000 1.7 N/A 1.7 N/A 13.6 7/312011
MPF -61 1951170 50029225820000 62 Need top job
MPF -62 1951610 50029226090000 2.0 NA/ 2.0 N/A 13.6 9/1/2011
MPF-65 1970490 50029227520000 1.5 N/A 1.5 N/A 13.6 8/11/2011
MPF -66A 1961620 50029226970100 0.8 N/A 0.8 N/A 8.5 7/31/2011
MPF -69 1951250 50029225860000 0.8 N/A 0.8 N/A 8.5 8/4/2011
MPF -70 1951530 50029226030000 1.7 N/A 1.7 N/A 15.3 7/31/2011
MPF -73A 2001980 50029227440100 1.5 N/A 1.5 N/A 13.6 8/11/2011
MPF -74 1961080 50029226820000 1.7 N/A 1.7 N/A 13.6 7/31/2011
MPF -77 1951360 50029225940000 0.2 N/A 02 N/A 6.8 10/5/2011
MPF -78 1951440 50029225990000 0.7 N/A 0.7 N/A 5.1 7/31/2011
MPF -79 1971800 50029228130000 0.6 N/A 0.6 N/A 6.8 8/3/2011
MPF -80 1982170 50029229280000 0.5 N/A 0.5 N/A 3.4 8/3/2011
MPF -81 2000660 50029229590000 0.9 N/A 0.9 N/A 8.5 8/3/2011
MPF-82 2091350 50029229710000 1.7 N/A 1.7 WA 15.3 8/3/2011
MPF-83 2000930 50029229630000 12 WA 12 N/A 13.6 8/3/2011
MPF -84B 2001760 50029229310200 1.2 N/A 12 N/A 10.2 8/3/2011
MPF-85 1982500 50029229360000 0.1 N/A 0.1 N/A 7.7 9/1/2011
MPF -86 2010870 50029230180000 0.8 N/A 0.8 N/A 6.8 8/12/2011
MPF -87A 2032130 50029231840100 1.3 N/A 1.3 N/A 11.9 8/132011
MPF -88 2031930 50029231850000 1.3 N/A 1.3 N/A 15.3 8/3/2011
MPF -89 2050900 50029232680000 1.2 N/A 1.2 N/A 102 8/3/2011
MPF -90 2012110 50029230510000 1.8 N/A 1.8 N/A 18.7 8/3/2011
MPF -91 2051100 50029232710000 1.7 N/A 1.7 N/A 11.9 8/13/2011
MPF -92 1981930 50029229240000 0.8 N/A 0.8 N/A 5.1 8/13/2011
MPF -93 2050870 50029232660000 0.3 N/A 0.3 N/A 7.7 9/1/2011
MPF -94 2011700 50029230400000 1.8 N/A 1.8 N/A 13.6 8/13/2011
MPF -95 1981790 50029229180000 0.5 N/A 0.5 N/A 3.4 8/13/2011
MPF -96 2081860 50029234060000 0.1 N/A 0.1 N/A 6.0 9/1/2011
MPF -99 2061560 50029233320000 1.3 N/A 1.3 N/A 11.9 8/11/2011
~-,,--- ~,
~~.~..__..\'.~ u...
c4¡c:
/",,->-."-'\
Winton, Jim and Bob,
Please see the attached M/T forms for the following wells:
./ PBU 03-10: CMIT-/AxOA for Waiver compliance:! ¡ ?a.J /
)
PBU 04-08: MIT!A to evaluate the well for an IAxOA AA and waiver
./PBU R-25A: MITIA Pre-dewatering ( ! z...::.~) ~
/PBU 04-13: M/T/A Pre MI swap ;:¿._;)
v'~BU P1-25: MIT/A Pre MI swap c¡J:"ZC~IC, f!,tS5
,/PBU S-101: MITIA Pre MI swap 1\\'23IZ'-('3 j' 5.S
(...,PBU NK-13: M!TIA for UIC Compliance, Chuck Scheve witnessed
:~
'~! Z ,.,\~'L I
/,The MIT form for PBU X-36 (prD #1961670) was emailed by Anna Dube on 9/10/06. If you need an
additional copy or did not receive the emai!, ! will gladly send it again.
Thank you for your patience.
«MIT PBU S-10111-23-03.x/s» «MIT GPMA P1-25 09-06-06.xls» «MIT PBU 04-13
08-10-03.xfs» «MIT PBU 04-08 08-04-05.xls» «MIT PBU R-25A 06-12-05.xls» «MIT PBU 03-10
09-30-05.xls» «MIT PBU NK-13 09-19-06.xfs»
Andrea Hughes
(Filling in for Joe Anders)
Well Integrity Engineer
Office: (907) 659-5102
Pager: (907) 659-5100 x1154
seI\NNE~); SEP 2 9 20Gt
Hi Jim,
Thank you for the note.
To update you on MITs that are
é 1) PBU 04-13; due 1/8/2006
.2) PBU 8-101; due 2/25/2006
3) PBU NK-13; due 5/4/2006
~4) PBU X-36; due 5/20/2006
5) PBU R-25A; due 7/24/2006
past due:
Completed
Completed
Completed
Completed
Completed
8/10/03
11/23/03
9/Ð/06
9/5/06 -
6/12/05
Sent in earlier e-mail
We agree to schedule MITs on the following wells once on injection:
lof4
9/25/2006 9: 15 AM
~- .~ ,- --"., '--'-1' -' -- V'~ . 'v-"e' ~J" \' '~', ,/...
.
Schedule when
Schedule post Rig
Schedule when
Schedule post Rig
1) MPU H-06; due 2/28/2006 (S1 since 7/2002)
returned to injection
2) PBU WG1-01; due 4/22/2006 (S1 since 12/12/2005)
Sidetrack later this year
3) MPU F-41; due 5/14/2006 (S1 since 5/2005)
returned to injection
4) PBU S-31A; due 6/1/2006 (S1 since 12/2004)
Workover
~ 5) PBU PI-0l; due 6/4/2006 (S1 since 6/2006 for workover) A patch to
restore integrity is planned. Scheduel when returned to injection
¿ 6) PBU Pl-25; due 7/2/2006 (81 since 6/2006)
'l 7) PBU GC-02C; due 7/22/2006 (S1 since 4/2006)
returned to injection, estimated some time in '07.
Completed 9/6/06
Schedule when
Others
/1) PBU 03-10; M1T 9/30/2005 (CM1T 1AxOA)
2) PBU 04-08; M1Ts (1A and OA) doneper monthlyinjector rpt; date unknown-
"
this well is currently S1 with an AA and Waiver being drafted.
I apologize for this office dropping the ball on these wells. Thank you for
your patience in this matter,
Ron Wilson
WI Tech
659-5524
------------------------------
We have recently completed a mid year review of MIT data from our inspection
database to see how many injection wells may be in question regarding M1T
timing. Results of our review relating to BP-operated fields are as follows:
M1Ts are past due for the following wells (injecting as of 7/31/2006)
1) PBU 04-13; due 1/8/2006
2) PBU S-101; due 2/25/2006
3) PBU NK-13; due 5/4/2006
4) PBU X-36; due 5/20/2006
5) PBU R-25A; due 7/24/2006
The following shut in wells are past their due date for M1T
1) MPU H-06; due 2/28/2006 (S1 since 7/2002)
2) PBU WG1-01¡ due 4/22/2006 (81 since 12/12/2005)
3) MPU F-41; due 5/14/2006 (S1 since 5/2005)
4) PBU S-31A; due 6/1/2006 (S1 since 12/2004)
5) PBU PI-01¡ due 6/4/2006 (S1 since 6/2006 for workover)
6) PBU Pl-25; due 7/2/2006 (S1 since 6/2006)
7) PBU GC-02C; due 7/22/2006 (81 since 4/2006)
A M1T for each well injecting on the list should be conducted as soon as
practical; please notify the Commission for an opportunity to witness.
Regarding S1 injectors, the Commission suggests deferring testing (at least
20f4
9/25/20069: 15 AM
_~ \Å Å~ ,u~-'-h _. vv \"~ ..v_>." ~Jn \Á 'L" 1/...
h C ., , d ) . 1 ., . ,. d d 11
t e ommlSSlon's wltnesse test untl In]ectlon lS recommence an we
conditions have stabilized.
There's also two wells with M1Ts that have apparently been done (not
witnessed) that we would like to have for our database:
1) PBU 03-10; M1T 9/30/2005 (CM1T 1AxOA)
2) PBU 04-08; M1Ts (1A and OA) done per monthly injector rpt; date unknown
As with all operating companies, the Commission is willing to work with you
to take advantage of operating efficiencies in scheduling M1Ts (perform
multiple M1Ts per pad; perform tests during the more temperate months;
etc.). Feel free to call if you have any questions, and thank you in advance
for your prompt attention to those M1Ts that are past due.
Jim Regg
AOGCC
Content-Description: MIT PBU S-lOl 11-23-03.xls
MIT PBU S-lOl 11-23-03.xls Content-Type: application/vnd.ms-excel
Content-Encoding: base64
Content-Description: MIT GPMA Pl-25 09-06-06.xls
MIT GPMA Pl-25 09-06-06.xls Content-Type: application/vnd.ms-excel
Content-Encoding: base64
Content-Description: MIT PBU 04-13 08-10-03.xls
MIT PBU 04-13 08-10-03.xls Content-Type: application/vnd.ms-excel
Content-Encoding: base64
Content-Description: MIT PBU 04-08 08-04-05.xls
MIT PBU 04-08 08-04-05.xls Content-Type: application/vnd.ms-excel
Content-Encoding: base64
Content-Description: MIT PBU R-25A 06-12-05.xls
MIT PBU R-25A 06-12-05.xls Content-Type: application/vnd.ms-excel
Content-Encoding: base64
3 of 4 9/25/2006 9: 15 AM
VJ 'V\' ,~""/v~,vhv,,,,-VU\' 'L/>en'VV'V.-",-..Jn\l ,,-,en/...
.
Content-Description: MIT PBU 03-10 09-30-05.xls
MIT PBU 03-10 09-30-0S.xls Content-Type: application/vnd.ms-excel
Content-Encoding: base64
Content-Description: MIT PBU NK-13 09-19-06.xls
MIT PBU NK-13 09-19-06.xls Content-Type: application/vnd.ms-excel
Content-Encoding: base64
4 of 4 9/25/2006 9: 15 AM
~
~
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
REPORT OF SUNDRY WELL OPERATIONS
~
~-
""'
1. Operations Performed:
AbandonD
Alter Casing 0
Change Approved Program 0
2. Operator
SuspendD
Repair Well 0
Pull TubingD
Operation Shutdown D
Plug PerforationsD
Perforate New Pool D
4. Current Well Class:
Perforate 0 WaiverD
Stimulate 0 Time ExtensionO
Re-enter Suspended Well 0
Other]]
Change to WAG
Name:
BP Exploration (Alaska), Inc.
5. Permit to Drill Number:
197-0950
41.30
8. Property Designation:
ADL-355016
11. Present Well Condition Summary:
Development D
Stratigraphic D
9. Well Name and Number:
MPF-41
10. Field/Pool(s):
Kuparuk River Field I Kuparuk River Oil Pool, Milne Point Unit
ExploratoryD
ServiceŒ)
6. API Number
50-029-22770-00-00
3. Address: P.O. Box 196612
Anchorage, Ak 99519-6612
7. KB Elevation (ft):
Total Depth measured 19893 feet
true vertical 7943.6 feet
Effective Depth measured 19785 feet
true vertical 7856.7 feet
Plugs (measured)
Junk (measured)
None
19784
Casing
Conductor
Production
Surface
Length
82
19839
9274
Size
20" 91.5# H-40
7" 26# L-80
9-5/8" 40# L-80
MD
TVD
Burst
1490
7240
5750
Collapse
470
5410
3090
31
29
30
113 31.0 - 113.0
- 19868 29.0 - 7923.5
9304 30.0 - 4622.7
Perforation depth:
Packers & SSSV (type & measured depth): 4-1/2" Baker S-3 Perm Packer
12. Stimulation or cement squeeze summary:
Intervals treated (measured):
Treatment descriptions including volumes used and final pressure:
Representative Daily Average Production or Iniection Data
Gas-Met Water-Bbl Casing Pressure
0 -1830 948
@
RECEIVED
MAY 2 (j
9229 .4'-t.- 2004
.~ Oil & G.!s 1'--
~~
Measured depth: 19475 -19487,19495 -19513,19521 -19555
True vertical depth: 7607.19.7616.87,7623.32 - 7637.81,7644.25 - 7671.59
Tubing ( size. grade. and measured depth):
4-1/2" 12.6# L-80
@
27
9194
13
Prior to well operation:
Subsequent to operation:
Oil-Bbl
0
0
-1371
0
617
Tubing Pressure
3177
4115
14. Attachments:
15. Well Class after proposed work:
ExploratoryD
DevelopmentD
ServiceŒ]
Signature
Garry Catron
Garry Catron
)j~~
16. Well Status after proposed work: Operational Shutdown D
OilD GasD WAG ŒI GINJD WINJD WDSPLD
Prepared by Garry Catron (907) 564-4657.
SUndry Number or NIA if C.O. Exempt:
N/A
Copies of Logs and Surveys run -
Daily Report of Well Operations-
17. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Contact
Printed Name
Title
Production Technical Assistant
Phone 564-4657
Date
10/13/98
Form 10-404 Revised 12/2003
OR1G\t~AI
RIDMS SF l
JUN 0 8 li- .
..
~.
r--...
,~
~
MPF-41
DESCRIPTION OF WORK COMPLETED
NRWO OPERATIONS
EVENT SUMMARY
08/10/98 Attempt to tag TO. Only got to 14,431' MD, couldn't get any further
10/07/98 Attempted injection survey with Atlas tractor. Slow going, so will reconfigure tool with lower
temp oil and try again
10/12/98 Atlas tractor injection survey attempt #2. Tractor shorted out
10/13/98 Put on WAG Injection
FLUIDS PUMPED
BBLS
0
No Fluids Pumped
TOTAL
Page 1
..~-'
t.
",.......,
..J~
Tree: 4 1/8" - 5M "FLS" CIW tree
Wellhead: 11" x 11" 5M FMC Gen.
5 wI 11" FMC Tbg. Hng. ,4.5" NSCT
lift threads, 4" CIW "H" BPV profile
20" 91.1 ppl, H-40
I 113' I-
KOP @ 300'
Max. hole angle = 76 to 78.6 deg.
tl 4500' to 17,300'
Hole angle through perfs = 36 deg.
4.5", 12.6 ppl, L-80 IBT tubing
(cap. = 0.0152 bpf, drift = 3.958")
Minimum tubing restriction = 3.725"
no-go in "XN" profile @ 9217' md'
95/8",40 ppt, L-80 Btre. 19304' md ~
7" 26 ppl, L-80, Mod. Btrc. prod. casing
( drift 10 = 6.151", cap. = 0.0383 bpI)
Stimulation Summary
none performed
Perforation Summary
Ref log: 06/24/97 CET
Size SPF Interval (TVD)
Kup "A3"
3-318 6 19,475'-19,487' 7,;;07' -7,617'
Kup "A2"
3-318 6 19,495'-19,513' 7,1323' -7,637'
Kup "Ai"
3-318 6 19.521'-19,555' 7,644' -7,671'
Alpha Jet eharges @ 60 deg. phasing
Fish: Seat (5.5" 00 x l' ) and 2" ball
trom shear out sub (used to set packer)
å. 119,785' md I
,~1\:Ù;M . ~ ;:' ::;~~O~I:~~PBTD) 119,868' md I
MPU F. 41i
\1;..
\
I
I
DATE REV. BY COMMENTS
06/07/97 JBF Drilled and Cased by Nabors 22E
07/01/97 MOO Initital Perforations
09/10/97 JBF Initial Completion By Nabors 4ES
~
Orig. DF elev. = 29.0' (N 22E)
Orig. GL. elev.= 12.3'
DF to top of 7" hgr. = 28.5' (N 22E)
0 9 5/8" Howco
'ES' Cementer
I 2009' md I
7" Baker 'S-3" Packer 19194' md I
4.5" HES 'XN' npl. 19217' md I
(wI 3.725" no-go)
6.125" x 15" scoop guide 19230' md I
Two 7" 21' marker joints
trom 19,264' t019,306' md
r
I
l
j
MILNE POINT UNIT
WELL F-41i
API NO: 50-029-22770
BP EXPLORATION (AK)
MEMORANDUM
State of Alaska
Alaska Oil and Gas Conservation Commission
TO: Camille O. Taylor ~ DATE' May 14, 2002
Chair
~O~~~BJECT: Mechanical IntegrityTests
THRU: Tom Maunder ~ BPX
P.I. Supervisor~~~., ~'o.,~\,~,-'~~¥, MPU B-25,F-41 ,J-17, L-34
FROM: John Crisp Milne Point Field
Petroleum Inspector Milne Point Unit
NON- CONFIDENTIAL
,
Well[ B-2~
P.T;D.I ..~853020'''
! Notes:
'Well! 1~-41
P'.T-D.I 197O95o
Notes'
' ~elli J-17 .
P.T.D.I 1972080
Notes'
'We,,I L-3~
P.T.D.i ~*~°~°6'
~ote~:
Packer 'Depth ' Pretest I'nitial 15 M'in. L30 Mi"n. ' '
Type Inj.I N IT'v'D' I 7032 ITubingl 2600J 260(~ '!'2600 i' 2600 l~nterval! 4'
,T.'ypetestl P., ITMpsil 2000 ! caSing J 650 i 2000 I, 1990, ! 196.0, I P/F I ---P
Typeinj'I ~
Type test
i i ! i ! i I
," 'lTest psi J !5'Oo I Casing ! 590 ,J" i'510 '1 1460 J 1460
9rval"j 4
Type,nj.! S ! T.V.D. I' 3432 I Tubing I~0 I~0 I~0 I~0
Type testl P I Testp'sil 15.00 Icasingl 36°' ,I ~54° J '~5°° I 1490 I P/~:' !'P
Type lnj.! N '! T'v'D' !~408 I'Tubingl 780[ 840 ! "840 I" 840 I~nterva~l 4'
Typetest! P , ITestpsiI 1~00 I Casi'ng'[ ' ', .... 'i,1700 I, .1670 ! 1660 i PiF ! P
Type INJ. Fluid Codes
F = FRESH WATER INJ.
G -- GAS INJ.
S = SALT WATER INJ.
N = NOT INJECTING
Type Test
M= Annulus Monitoring
P= Standard Pressure Test
R= Internal Radioactive Tracer Survey
A= Temperature Anomaly Survey
D= Differential Temperature Test
Test's Details
I traveled to BP's Milne Point Field to wimess MIT's. No Failures witnessed.
Interval
I= Initial Test
4= Four Year Cycle
V= Required by Variance
W= Test during Workover
O= Other (describe in notes)
M.I.T.'s performed: 4 Number of Failures: 0_
Attachments:
Total Time during tests: 8 hm.
cc:
MIT report form
5/12/00 L.G.
MIT BPX MPU 05-14-02jc. xls
5/16/02
THE MATERIAL UNDER THIS COVER HAS BEEN
MICROFILMED
·
ON' OR BEFORE
JANUARY 03, 2001,
P L
M
A T
E
E IA L U N D
W
E R
T H
IS M ARK ER
C:LO~ILM.DOC
AOGCC Geological Materials Inventory
PERMIT 97-095
BP EXPLORATION
Log Data Sent Recieved
7733 ~PERRY MPT/GRC/EWR/CNP/RI-IOB 7/23/97 7/23/97
7770 d~CHLUM. PDC-GR/CCL 8/8/97 8/12/97
CET 6/24/97 1~188300-19730 7/10/97 7/11/97
Box
CHEM CTTR ~6811-7020 8/29/97 11/5/97 11/5/97
CHEM CTTR 6//6811-7020 8/20/97 11/5/97 11/5/97
DGR/CNP/SLD-MD ~0-19893 7/23/97 7/23/97
.
DGR/CNP/SLD-TVD ~,jl/12-7948 7/23/97 7/23/97
DGR/EWR4-MD .420-19893 7/23/97 7/23/97
DGR/EWR4-TVD ~12-7948 7/23/97 7/23/97
OR ~9000-19750 7/10/97 7/11/97
GR/CCL ~91~00-19700 7/10/97 7/11/97
GR/CCL/JWL .;_.~ 9210-19651 7/2/97 7/7/97
INJP ~I~00-19600 10/27/98 11/3/98
wA~-407 Completion Date ~/5 ~3/. V ~' Daily well ops J'; .....
Are dry ditch samples required? yes ~ no And received? ~ej~,_~:_~ ..... no
Was the well cored? yes ~ no Analysis _description recieved?
Are tests required? yes ~ no Received? ._, no
Well is in compliance ~ -'[!
Initial
Comments
UIC
yes ..-:.: ..... no
Thursday, September 23, 1999 Page 1 of l
· '- STATE OF ALASKA ~'~. ~' ¢~
ALASKA OIL AND GAS CONSERVATION COMMISSION
WELL COMPLETION OR R£COMPLETION REPORT AND
1. Status of Well Classificati~~J/d~"l~l]]0n$. C0mmJr~i0
[] Oil [--] Gas [] Suspended []Abandoned [] Service Water Injection Anchorage
2. Name of Operator 7. Permit Number
BP Exploration (Alaska)Inc. 97-95 397-121
3. Address 8. APl Number
P.O. Box 196612, Anchorage, Alaska 99519-6612 50-029-22770
4. Location of well at surface~': i;_//._cub__...~. _. __~~.~ !'~ :',~ '~. i~!i~I 9. Unit or Lease Name
1955' NSL, 2625' WEL, SEC. 6, T13N, R10E, Ui~l ,,~/).~" ~/ ' Milne Point Unit
At top of productive interval
, ............. 10. Well Number
At total depth ~ · - '~ .... 11. Field and Pool
424' NSL, 481' EWL, SEC. 21, T14N, R10E, UN ........ · ........ '-"~' ' ...... ~" ' ' Milne Point Unit / Kuparuk River
5. Elevation in feet (indicate KB, DF, etc.) 16. Lease Designation and Serial No. Sands
KBE = 41.3'I ADL 355016
12. Date Spudded5/23/97 113' Date T'D' Reached ! 14' Date C°mp" Susp" °r Aband'J15' Water depth' if °fish°re 16' N°' °f C°mpleti°ns6/4/97 9/10/97 N/A MSL One
17. Total Depth (MD+TVD) 118. Plug Back Depth (MD+TVD)119. Directional Survey 120. Depth where SSSV set 21. Thickness of Permafrost
19893 7944 FTI 19785 7857 FTI []Yes []NoI N/A MD 1800' (Approx.)
22. Type Electric or Other Logs Run
MWD, EMSS, RLL/DEN, GR/JB
23. CASING~ LINER AND CEMENTING RECORD
CASING SE-FI-lNG DEPTH HOLE
SIZE WT. PER FT. GRADE TOP BOTTOM SIZE CEMENTING RECORD AMOUNT PULLED
20" 91.1# H-40 32' 110' 24" 250 sx Arcticset I (Approx.)
9-5/8" 40# L-80 31' 9304' 12-1/4" 1900 sx PF 'E', 993 sx Class 'G'
7" 26# L-80 28' 19868' 8-1/2" 300 sx Class 'G'
24. Perforations open to Production (MD+TVD of Top and 25. TUBING RECORD
Bottom and interval, size and number) S~ZE DEPTH SET (MD) PACKER SET (MD)
3-3/8" Gun Diameter, 6 spf 4-1/2", 12.6#, L-80 9231' 9194'
MD TVD MD TVD
19475'-19487' 7607'-7617'
19495'-19513' 7623'-7638' 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC.
19521 '-19555' 7644'-7672' DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED
Freeze protect with 240 bbls diesel
ngl lP,[hl
27. PRODUCTION TEST
Date First Production J Method of Operation (Flowing, gas lift, etc.)
September 14, 1997J Water Injection
Date of Test !Hours Tested PRODUCTION FOR OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE J GAS-OIL RATIO
TEST PERIOD
I
Flow Tubing Casing Pressure CALCULATED OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-APl (CORR)
Press. 24-HOUR RATE
28. CORE DATA
Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips.
Form 10-407 Rev. 07-01-80 Submit In Duplicate
29. Geologic Markers 30. Formation Tests
Measured True Vertical Include interval tested, pressure data, all fluids
Marker Name Depth Depth recovered and gravity, GOR, and time of each phase.
Top Kuparuk 'B' 19426' 7568'
Top Kuparuk 'A' 19485' 7615'
Top Kuparuk A2 19511' 7636'
31. List of Attachments
Summary of Daily Drilling Reports, Surveys
32. I hereby certify that the foregoing is true and correct to the best of my knowledge
Signed ChipAJvord :~-~ ~. ~ Title Senior Drilling Engineer Date
MPF-41¢ 97-95 397-121 Prepared By Name/Number: Kathy Campoamor, 564-5122
Well Number Permit No. / Approval No.
INSTRUCTIONS
GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and
leases in Alaska.
ITEM 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water
supply for injection, observation, injection for in-situ combustion.
ITEM 5.' Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces
on this form and in any attachments.
ITEM 16 AND 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item
16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional
interval to be separately produced, showing the data pertinent to such interval.
ITEM 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.).
ITEM 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of
the cementing tool.
ITEM 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In,
Other-explain.
ITEM 28: If no cores taken, indicate 'none'.
Form 10-407 Rev. 07-01-80
Performance Enquiry Report
Operator BP Exploration Date 22:11, 04 Dec 97
Page 1
The analysis is from - 02:00, 30 May 97 - to - 02:00, 30 May 97
Programs in Result Table: MPF-4 ! DRILL AND COMPLETE
Well Type Time From Time To Duration Description E.M.W.(equivalent mud weight)
MPF-41 Event 02:00, 30 May 97 02:00, 30 May 97 0 hr 0 min Obtained leak off 11.8
Hole Size MDR
8-1/2
Facility
Date/Time
21 May 97
22 May 97
23 May 97
24 May 97
25 May 97
26 May 97
27 May 97
28 May 97
M Pt F Pad
Progress Report
Well MPF-41
Rig Nabors 22E
Page
Date
Duration
Activity
18:01-04:30
04:30-04:45
06:00-08:00
08:00-10:00
10:00-11:00
11:00-12:00
12:00-16:30
16:30-17:00
17:00-06:00
06:00-14:30
14:30-15:30
15:30-16:30
16:30-17:00
17:00-18:00
18:00-06:00
06:00-10:30
10:30-12:00
12:00-14:30
14:30-15:30
15:30-17:00
17:00-18:00
18:00-19:00
19:00-20:30
20:30-20:45
20:45-06:00
06:00-12:00
12:00-13:30
13:30-15:00
15:00-16:00
16:00-06:00
06:00-16:00
16:00-16:30
16:30-17:00
17:00-17:30
17:30-18:00
18:00-23:00
23:00-01:30
01:30-05:00
05:00-06:00
06:00-10:00
10:00-12:30
12:30-15:30
15:30-19:30
19:30-20:30
20:30-20:45
20:45-06:00
06:00-08:30
08:30-10:30
10:30-12:00
12:00-17:00
17:00-18:00
18:00-18:30
18:30-19:30
19:30-20:30
10-1/4 hr
1/4 hr
2hr
2hr
lhr
lhr
4-1/2 hr
1/2 hr
13hr
8-1/2 hr
lhr
lhr
1/2 hr
lhr
12hr
4-1/2 hr
1-1/2 hr
2-1/2 hr
lhr
1-1/2 hr
lhr
lhr
1-1/2 hr
1/4 hr
9-1/4 hr
6hr
1-1/2 hr
1-1/2 hr
lhr
14hr
10hr
1/2 hr
1/2 hr
1/2 hr
1/2 hr
5hr
2-1/2 hr
3-1/2 hr
lhr
4hr
2-1/2 hr
3hr
4hr
lhr
1/4 hr
9-1/4 hr
2-1/2 hr
2hr
1-1/2 hr
5hr
lhr
1/2 hr
lhr
lhr
Rig moved 95.00 %
Rig moved 100.00 %
Rigged up Drillfloor / Derrick
Rigged up Bell nipple
Made up BHA no. 1
Fill pits with Water based mud
Made up BHA no. 1
Held safety meeting
Drilled to 1298.0 fl
Drilled to 2537.0 ft (cont...)
Circulated at 2537.0 ft
Pulled out of hole to 193.0 ft
Serviced Top drive
R.I.H. to 2537.0 ft
Drilled to 4345.0 ft
Drilled to 5013.0 ft (cont...)
Circulated at 5013.0 ft
Pulled out of hole to 1107.0 ft
Pulled BHA
Made up BHA no. 2
Serviced Top drive
Singled in drill pipe to 1700.0 ft
R.I.H. to 5013.0 ft
Took MWD survey at 4936.0 ft
Drilled to 6344.0 ft
Drilled to 7000.0 ft (cont...)
Circulated at 7000.0 ft
Pulled out of hole to 4825.0 ft
R.I.H. to 7000.0 ft
Drilled to 8217.0 ft
Drilled to 8965.0 ft (cont...)
Circulated at 8965.0 ft
Pulled out of hole to 8407.0 ft
Singled in drill pipe to 8872.0 ft
Reamed to 8965.0 ft
Drilled to 9325.0 ft
Circulated at 9325.0 ft
Pulled out of hole to 197.0 ft
Serviced Top drive
R.I.H. to 9325.0 ft
Circulated at 9325.0 ft
Pulled out of hole to 1112.0 ft
Pulled BHA
Rigged up Casing handling equipment
Held safety meeting
Ran Casing to 9304.0 ft (9-5/8in OD)
Circulated at 9303.0 ft
Mixed and pumped slurry - 551.000 bbl
Displaced slurry - 698.000 bbl
Circulated at 2008.0 ft
Mixed and pumped slurry - 387.000 bbl
Displaced slurry - 152.000 bbl
Cleared Bell nipple
Rigged down Casing handling equipment
1
24 September 97
Facility
M Pt F Pad
Progress Report
Well MPF-41
Rig Nabors 22E
Page
Date
2
24 September 97
Date/Time
29 May 97
30 May 97
31 May 97
01 Jun 97
02 Jun 97
03 Jun 97
04 Jun 97
05 Jun 97
20:30-21:30
21:30-22:30
22:30-00:00
00:00-02:30
02:30-03:30
03:30-06:00
06:00-08:30
08:30-09:30
09:30-10:30
10:30-13:00
13:00-15:00
15:00-16:00
16:00-18:00
18:00-21:00
21:00-22:00
22:00-00:30
00:30-01:30
01:30-02:00
02:00-06:00
06:00-04:00
04:00-05:30
05:30-06:00
06:00-07:30
07:30-08:30
08:30-09:30
09:30-06:00
06:00-21:30
21:30-23:30
23:30-02:30
02:30-03:30
03:30-04:30
04:30-06:00
06:00-07:30
07:30-06:00
06:00-10:00
10:00-12:30
12:30-13:30
13:30-14:30
14:30-15:30
15:30-03:30
03:30-06:00
06:00-06:30
06:30-10:00
10:00-11:00
11:00-12:00
12:00-16:00
16:00-17:30
17:30-21:00
21:00-00:30
00:30-06:00
06:00-10:00
10:00-12:30
12:30-14:00
14:00-15:00
Duration
lhr
lhr
1-1/2 hr
2-1/2 hr
lhr
2-1/2 hr
2-1/2 hr
lhr
lhr
2-1/2 hr
2hr
lhr
2hr
3hr
lhr
2-1/2 hr
lhr
1/2 hr
4hr
22 hr
1-1/2 hr
1/2 hr
1-1/2 hr
lhr
lhr
20-1/2 hr
15-1/2 hr
2hr
3hr
lhr
lhr
1-1/2 hr
1-1/2 hr
22-1/2 hr
4hr
2-1/2 hr
lhr
lhr
lhr
12hr
2-1/2 hr
1/2 hr
3-1/2 hr
lhr
lhr
4hr
1-1/2 hr
3-1/2 hr
3-1/2 hr
5-1/2 hr
4hr
2-1/2 hr
1-1/2 hr
lhr
Activity
Removed Bell nipple
Installed Casing head
Rigged up BOP stack
Tested BOP stack
Installed Wear bushing
Racked back drill pipe
Racked back drill pipe (cont...)
Serviced Block line
Serviced Top drive
Made up BHA no. 3
Singled in drill pipe to 2008.0 ft
Drilled installed equipment - DV collar
Singled in drill pipe to 5500.0 ft
R.I.H. to 9216.0 ft
Tested Casing - Via annulus and string
Drilled installed equipment - Float collar
Circulated at 9345.0 ft
Performed formation integrity test
Drilled to 9973.0 ft
Drilled to 13019.0 ft (cont...)
Circulated at 13019.0 ft
Pulled out of hole to 11624.0 ft
Pulled out of hole to 9300.0 ft (cont...)
Serviced Top drive
R.I.H. to 13019.0 ft
Drilled to 15636.0 ft
Drilled to 17540.0 ft (cont...)
Circulated at 17540.0 ft
Pulled out of hole to 9300.0 ft
Serviced Block line
Serviced Top drive
R.I.H. to 12000.0 ft
R.I.H. to 17540.0 ft (cont...)
Drilled to 18642.0 ft
Drilled to 18879.0 ft (cont...)
Circulated at 18879.0 ft
Pulled out of hole to 16000.0 ft
Serviced Top drive
R.I.H. to 18879.0 ft
Drilled to 19893.0 ft
Circulated at 19893.0 ft
Circulated at 19893.0 ft (cont...)
Pulled out of hole to 9300.0 ft
Serviced Block line
Serviced Top drive
R.I.H. to 19260.0 ft
Reamed to 19893.0 ft
Circulated at 19893.0 ft
Dropped EMSS survey barrel
Pulled out of hole to 5100.0 ft
Laid down 4650.0 ft of 5in OD drill pipe
Pulled BHA
Tested Top ram
Rigged up Casing handling equipment
Facility
M Pt F Pad
Progress Report
Well MPF-41 Page
Rig Nabors 22E Date
3
24 September 97
Date/Time
06 Jun 97
07 Jun 97
15:00-15:30
15:30-00:00
00:00-01:00
01:00-06:00
06:00-11:00
11:00-11:30
11:30-15:00
15:00-15:30
15:30-15:45
15:45-18:00
18:00-18:30
18:30-19:30
19:30-22:00
22:00-01:00
01:00-04:00
04:00-06:00
06:00-08:00
08:00-18:00
18:00-19:00
Duration
1/2hr
8-1/2 hr
lhr
5hr
5hr
1/2 hr
3-1/2 hr
1/2 hr
1/4 hr
2-1/4 hr
1/2hr
lhr
2-1/2 hr
3hr
3hr
2hr
2hr
10hr
lhr
Activity
Held safety meeting
Ran Casing to 9000.0 ft (7in OD)
Circulated at 9000.0 ft
Ran Casing to 7in (14350.0 ft OD)
Ran Casing to 19868.0 ft (7in OD) (cont...)
Rigged up Cement head
Circulated at 19868.0 ft
Pumped Water based mud spacers - volume 70.000 bbl
Mixed and pumped slurry - 61.000 bbl
Displaced slurry - 757.000 bbl
Tested Casing
Rigged down Casing handling equipment
Installed Seal assembly
Rigged down BOP stack
Installed Tubing head spool
Installed Xmas tree
Serviced Xmas tree
Laid out 5in drill pipe from derrick
Serviced Block line
SUMMARY OF DALLY OPERATIONS
SHARED SERVICES DRILLING- BPX/ARCO
Well Name: MPF-41i Rig Name: N-4ES AFE# 347073
Accept Date: 08/17/97 Spud Date: . Release Date: 09/10/97
AUGUST 18, 1997
MIRU. RD, SCOPE LOWER DERRICK, INSTALL RING, MU TORQUE PIT SIDE SUB
TIRES, MOVE PIPESHED, PITS, CAMP, #3 GEN, INSTALL TORQUE SUB TIRES.
RIG ACCEPTED 08/17/97 @ 1500 HRS.. ND FRAC TREE, NU ADAPTER FLANGE,
NU BOP, PULL FALSE BOWL W/BPV, SET TEST PLUG, NU BOP, CHANGE RAMS
TO 3-1/2". TEST BOP, WITNESS TEST WAIVED BY JOHN SPAULDING W/AOGCC.
PULL TEST PLUG, SET WR, LOAD PIPESHED W/3-1/2" DP, RIG F/I-IH. TIH W/DP
F/PIPESHED, SLM DRIFT 3-1/2" DP. SLIP DRLG LINE. TIH W/DP F/PIPESHED, SLM
DRIFT. CIRC OUT DIESEL FREEZE PROTECT. TIH W/ DP F/ PIPESHED, SLM
DRIFT.
AUGUST 19, 1997
LUB RIG. TIH W/3-1/2" DP & RBP RETRIEVING TOOL. LOAD PIPESHED W/3-1/2"
DP. CONT TIH. CIRC DISPLACE WELL W/BRINE. REV CIRC/WASH TO RBP, TAG
@ 15145, MONITOR WELL, LATCH INTO RBP, 5K OVER, PU 10', RIH T/15237',
MONITOR WELL STATIC, NO FILL. CBU. RETURN DIRTY FLUID. MONITOR WELL.
POOH. POOH SLOW W/3-1/2" DP. LD DP.
AUGUST 20, 1997
CUT 84', SLIP 42' DRILL LINE, LUB RIG. TOH W/3-1/2" DP & 7" RBP. PULL WR, SET
TEST PLUG, ND RAMS, NU 4-1/2" RAMS. TEST 4-1/2" RAMS. RU FLOOR FOR
TUBING RUN. MU PACKER & TAILPIPE ASSY, TIH T/4615'. PACKER STARTED
TAKING WT, 30k OVER, ATTEMPT TO PULL UP - NO GO. SET DOWN 30K - NO GO,
PULL 60K OVER - NO GO. PRESS UP ANNUL TO/1000#, HOLDING, RELEASE
HYDRIL, WORK UP/DOWN - NO GO. INSTALL HP, DROP BALL, SET PACKER
3000# @ 4615'. WAIT FOR HALLIBURTON SLICK LINE TO RETRIEVE RHC PLUG.
RU HES, RIH W/4-1/2" GR, ENGAGE BALL SEAT PLUG, POOH, RIG DOWN HLS RU
SWS ATTEMPT TO RIG CHEM CUTTER MU LUB PUMP IN SOH BAKER SENT
WRONG XO TO LOCATION SENT (4.5 NSC, NEED 4.5 BTC) W/FOR BAKER TO
DELIVER 4.5 BTC x 4.5 IF XO.
AUGUST 21, 1997
LUB RIG RU SWS NOTIFY MPU MEDIC REQUEST RADIO SILENCE ARM
CHEMICAL CUTTER RIH W/CHEM CUTTER TO 4300' CUTTER STOPPED DUE TO
HIGH HOLE ANGLE BRING PUMP ON LINE @ 2 BPM/2500 PSI CONT FILL LOG
CHEM CUTTER ON DEPTH & CUT 1 ¼" TUBING @ 4612' POOH & RD SWS TOOH
W/4 ~" TUBING SET TEST PLUG PULL 4 ~" RAMS & INSTALL 3 Y2 RAMS TEST 3
~" PIPE RAMS PER BP/AOGCC REQUIREMENTS GOOD TEST START PU BHA #1
FINISH PU BHA #1 PU 3 W' DP TAG @ 4612' WT 85k UP/50k DOWN MILL TUBING
Page 1 of 6
SUMMARY OF DALLY OPERATIONS
STUB & TOP SET SLIPS OF PKR (STOP MILLING @ BLM SLIPS) CIRC/COND
HOLE W/HIGH VIS SWEEPS PREP TO TOOH W/BHA #1.
AUGUST 22, 1997
PUMP DRY JOB LUB RIG TOOH (HAD OVER PULL SEVERAL TIMES 15-40k) W/DP
& BHA. CLEAN JUNK SUBS RIG REPAIRS DRAW WORKS CLUTCH MU BHA #2 TIH
TO PKR @ 4628' (PKR MOVED DOWN HOLE) SET 10k DOWN PU WT GAIN 8k
DROP BACK DOWN HOLE 15' BELOW WHERE PKR WAS FIRST TAGGED. ACTS
LIKE WE HAVE FISH. TOOH W/DP & BHA #3 - NO FISH! SPEAR GRAPPLES IN
CATCH POSITION NEVER GOT INSIDE OF FISH. START TIH W/BHA #2 START PU
2 7/8" 10.4# S-135 DRILL PIPE TAGGED FISH AGAIN @ 4712' SET DOWN 20k PU
SAW "BOBBLE" SET BACK DOWN FISH APPEARS TO BE GONE AGAIN PU AGAIN
NO BITE CONT IN HOLE.
AUGUST 23, 1997
LUB RIG FINISH LOADING PIPE SHED W/2 7/8" 10.4# PAC S-135 DRILL PIPE
START TIH W/2 7/8" DP TO 12000' REV CIRC TBG VOL + PUW 90k SOW 32k CONT
TIH W/REMAINDER OF 2 7/8" DP (TOTAL JTS 423) START TIH W/3 'Y:~" 15.5# DP
FROM DERRICK STOP @ 16000' REV CIRC TBG VOL + PUW 127k SOW 40k
FINISH RUNNING 3 Y:~" DP FROM DERRICK FINISH TIH W/3 Y:~" DP FROM PIPE
SHED PUSH FISH TO BTM @ 19808' DRILLERS DEPTH TOP OF FISH @ 19784'
WORK TOOLS START REV CIRC SWEEP PUW 190k SOW 65k FINISH REV CIRC
HOLE VOL CLEAN TOOH W/3 ~" DP SLIP 42' DRILLING LINE CONT TOOH W/2 7/8"
DP.
AUGUST 24, 1997
FINISH TOOH LD BHA #2 (RECOVERED FISH) LD FISH CLEAN (FLUSH) INSIDE OF
BOP STACK MU BHA #3 START TIH W/2 7/8" DP & 3 Y:~" DP FINISH TIH W/DP TAG
BTM W/MULE SHOE DEPTH OF CSG SCRAPER @ 19250'. START POOH W/BHA
#3 LD 3 Y2" DP CUT 84' SLIP 42' DRILL LINE CONT POOH W/BHA #3 LD 2 7/8" DP.
AUGUST 25, 1997
FINISH POOH W/BHA #3 LD 2 7/8" DP. PULL WEAR BRUSHING INSTALL TEST
PLUG CHANGE OVER TO 4W' PIPE RAMS PERFORM BOPE TEST PER BP/AOGCC
REQUIREMENTS RIGHT TO WITNESS WAIVIED BY L. GRIMALDI. LOAD PIPE
SHED W/4 Y~"x 12.6# x L-80 x IBT MOD TUBING. FINISH LOADING PIPE SHED
REVIEW WELL BORE W/BAKER SERVICE HAND & DRILLER PU TALL PIPE &
BAKER PKR START RIH W/4 ~" TUBING SET DOWN @ 4408' PU & TRY AGAIN
FELL THRU CONT SLOWLY IN HOLE SET DOWN AGAIN @ 4697' TRY THREE
TIMES TO EASE THRU NO-GO DECIDED NOT TO CONTINUE IN HOLE START
POOH LD (RANGE 3) TUBING.
AUGUST 26, 1997
FINISH POOH W/4 ~" COMPLETION ATTEMPT. INSPECT PACKER & LD RU HES
RIH W/5.9750" GR/JB TO 5075' RECOVERED A LARGE PEICE OF RUBBER & TWO
LARGE PIECES OF METAL SHAVINGS FROM "MILLED PACKER" RUN #2 RERAN
Page 2 of 6
SUMMARY OF DALLY OPERATIONS
SAME TO 5391' RECOVERED PIECE OF PKR "SLIPS" RUN #3 RERAN SAME TO
8072' RECOVERED A LARGE PIECE OF PKR "SLIPS" RUN #4 RERAN SAME TO
9550' RECOVERED METAL CUTTING RUN #5 RERAN SAME STOP @ 9800 START
POOH BECAME STUCK @ 7075' WORK FREE & FINISH POOH. RECOVER LARGE
PIECE OF METAL SHAVING & SOME METAL CUTTINGS. RD HES SET TEST PLUG
ND 4 Y2" RAMS INSPECT INSIDE OF BOP STACK CLEAN NU 2 7/8" RAMS TEST
PIPE RAMS TO 250/5000 PSI GOOD PULL TEST PLUG & SET WR RU FOR 2 7/8"
DRILL PIPE. MU BHA #4 START PICKUP 2 7/8" DRILL PIPE MU BHA #4 START
PICK UP 2 7/8" DRILL PIPE STOP @ 4750' REV TUBING VOL + 4 BPM/1100 PSI
CONT IN HOLE W/2 7/8" DP.
AUGUST 27, 1997
LUB RIG CONT PU 2 7/8" DP & RUN BHA #4 TO 9375' NO PROBLEMS REV CIRC
TUBING VOL + TOOH FOR BHA #5 CUT & SLIP DRILLING LINE MU BHA #5 & TIH
W/2 7/8" DP STOP @ 13000' REV CIRC TUBING VOL LOAD PIPE SHED W/3 ½" DP
CONT TIH W/3 ~" DP STOP @ 17600' REV CIRC TUBING CONT TIH W/3 Y:~" DP.
AUGUST 28, 1997
LUB RIG FINISH TIH W/3 Y~" DP TAG PBTD @ 19792' POH TO 19710' REV CIRC
HOLE VOL W/2 40 BBL HI VIS SWEEPS. START TOOH (LD) W/3 1/~,, DP & BHA #5
FINISH TOOH W/3 Y~" DP & BHA #5. FINISH TOOH W/3 ~" DP x 2 7/8" DP x BHA #5
x 2 7/8 x MULE SHOE CLEAN JBS JUNK BASKETS HAD HANDFULL OF METAL
SHAVINGS IN THEM & THERE WAS ONE SMALL PIECE OF METAL WEDGED IN
CASING SCRAPER.
AUGUST 29, 1997
PULL WEAR BUSHING & INSTALL TEST PLUG. CHANGE RAMS TO 4 W' TUBING
TEST RAMS TO BP & AOGCC REQUIREMENTS GOOD TEST. FINISH LOADING
PIPE SHED W/4 Y2" COMPLETION TUBING PU & INSPECT BAKER PKR & TAILPIPE
ASSY. START TIH W/4 ~" 12.6 L-80 TUBING PKR STARTED TO SET @ 6990'
ATTEMPT TO PUMP DOWN ANNULUS PRESSED UP TO 2500 PSI & HOLDING
DROP 2" BALL LET FALL ON SEAT PRESSURE UP & SET PKR TO LOCK IN
PLACE. ATTEMPT TO SHEAR SO SUB @ 5000 PSI RU HIGH PRESSURE
CONNECTION SHEAR SO SUB @ 6200 PSI (PREP WELL TO ALLOW SWS CHEM
CUTTER TO BE PUMPED DOWN HOLE - NOTE: A TUBING PUNCH WAS NOT AN
OPTION, NO 4 ¼" PUNCH ON SLOPE). WO SWS (FINISH UP ON PRESENT
JOB/LOAD OUT TRUCK/TRAVEL TO LOC) NOTIFY MPU MEDIC OF CHEM CUT
OPS STARTING. RU SWS.
AUGUST 30, 1997
CONT RIH W/CHEM CUTTER. HAD TO PUMP CUTTER DOWN @ 2 BPM/1800 PSI
LOG CUTTER INTO PLACE & CUT TUBING @ 6979' WLM START POOH HAVING
PROBLEMS W/TOOL HANGING UP STUCK TOOL SEVERAL TIMES WORKED
FREE & FINISHED POOH LD TOOL RD SWS RELEASE RADIO SILENCE. START
TOOH W/4 Y2" TUBING FINISH TOOH LD 169 JTS PUP JT & STUB FROM 2 FT PUP
JT ABOVE PKR INSTALL TEST PLUG CHANGE TO 3 W' PIPE RAMS. TEST PIPE
Page 3 of 6
SUMMARY OF DALLY OPERATIONS
RAMS TO BP/AOGCC REQUIREMENTS PULL TEST PLUG & INSTALL WEAR
BRUSH. RIG UP FLOOR TO RUN DP MU BHA #6 TIH W/BHA & 3 Y2" DP TAG TOF
@ 6987' (DRILLERS DEPTH) MILL ON 4 ~" TUBING STUG & PKR.
AUGUST 31, 1997
MILLED ON PKR TO 6992' PULLED UP HOLE (FRICTION BITE) TO 6972' PUMP
DRY JOB POOH W/3 ~" DP. FINISH TOOH LD MILL CLEAN JUNK BASKETS
(RECOVERED 1 GAL OF SHAVINGS & CHIPS) MU BHA #3 PULL WR INSTALL
TEST PLUG CHANGE RAMS TO 2 7/8" TEST PIPE RAMS TO BP/AOGCC
REQUIREMENTS. PULL TEST PLUG & INSTALL WEAR BRUSHING START RIH
W/BHA PU 2 7/8" DP FOUND PKR @ 6974' WORK TOOLS FISH ON SPEAR. START
TOOH W/FISH.
SEPTEMBER 01, 1997
LUB RIG FINISH TOOH W/3 Y2" DP & BHA LD FISH PKR. FLUSH & INSPECT INSIDE
OF BOP STACK INSTALL TEST PLUG PERFORM WEEKLY BOPE TEST PER
BP/AOGCC REQUIREMENTS - TEST WITNESSED BY C. SHEVEY. MU BHA #8, 6
3/16" SHOE ON GLOBE BASKET WOULD NOT ENTER CASING LD FLOBE BASKET
ATTEMPT TO REDUCE OD W/HAND GRINDER & TRY AGAIN NO-GO. SEND
GLOBE BASKET TO MACHINE SHOP TO REDUCE OD TO 6 1/16" CUT DRILLING
LINE ADJ BRAKE ROLLERS. RIG UP FLOOR PU 2 7/8" DP FROM PIPE SHED
(WHILE WO GLOBE BASKET) STAND BACK IN DERRICK. PU GLOBE BASKET RE-
DRESSED TO 6 1/16" TIH W/BHA #8 TO 6863' TAGGED JUNK REPAIR
ELECTRICAL ON RIG PUMP ATTEMPT TO WASH THRU JUNK NO GO. PU KELLY
& WASH/ROTATE THRU TO 6865' RIH TO 6928'. REV CIRCULATE TUBING VOL @
4 BPM/1500 PSI.
SEPTEMBER 02, 1997
FINISH REV CIRC TUBING VOL FROM 6950' GOT JUNK MOVING DOWN HOLE.
CONT TIH W/2 7/8" DP TAG JUNK AGAIN @ 6950' GOT JUNK MOVING DOWN
HOLE. CONT TIH PUSHING JUNK TO 9420' PUW 74k SOW 34k REV CIRC TUBING
VOL + CONT TIH PUSHING JUNK TO 13032' POW 97k SOW 47k REV CIRC TUBING
VOL + CONT TIH W/2 7/8" x 3 Y~" DP TO 17563' POW 140k SOW 49k START REV
CIRC FINISH REV CIRC TUBING VOL + CONT TO PBTD @ 19793' POH TO 19727'
POW 190k SOW 60k REC CIRC HOLE VOL W/2 HI VIS SWEEPS @ 3 BPM/1750 PSI.
START TOOH W/3 Y~"x 2 7/8" DP & BHA #8.
SEPTEMBER 03, 1997
LUB RIG FINISH TOOH W/2 7/8" DP & BHA #8 LD GLOBE BASKET RECOVERED 1
LARGE PIECE OF METAL & THE 2" STEEL PKR SETTING BALL LD & CLEAN BOOT
BASKETS RECOVERED A HANDFULL OF CUTTINGS/SHAVINGS MU BHA #9 (BALL
INSTALLED) START TIH W/2 7/8" DP TO 2679' WASH DOWN 1 JT WHILE PUMPING
THRU REV BASKET (RB). CONT TIH TO 3324' SAW "BOBBLE" WASH DOWN 1 JT
WHILE PUMPING THRU RB SLIP & OUT DRILLING LINE CONT RIH TO 6378' WASH
DOWN 1 JT WHILE PUMPING THRU RD REPEAT AGAIN @ 7290' CONT RIH TO
Page 4 of 6
SUMMARY OF DALLY OPERATIONS
8175' UNABLE TO GET ANY DEEPER UNABLE TO ROTATE DP LD RB CLEAN OUT
MISC PIECES OF JUNK RECOVERED 1 LARGE PIECE OF "FLATTEN" METAL.\
SEPTEMBER 04, 1997
CLEAN BOOT BASKETS & MU BHA TIH & TAG JUNK @ 3523' & 3873' & CONT RIH
TO 5473' CIRC F/5473' TO 5504' @ 72-SPM 1800 PSI TIH & WORK THRU TIGHT
SPOTS & CIRC F/8564' TO 8578' TIH TO 10012' CIRC F/10012' TO 10042' TIH &
WORK THRU TIGHT SPOTS @ 10742'-10835', 11169', 11471', 13281' CIRC
F/13308'-13339' & RIG FLOOR TO RUN 3.5" DP RIH & WORK THRU TIGHT SPOTS
@ 15028', 15059', 15602', 15833' CIRC ON BTM @ 3 BPM 3000 PSI & DROP BAR &
PUMP DN TO CIRC SUB & PUMP DRY JOB POOH W/REVERSE CIRC BASKET &
TIGHT SPOTS @ 12600', 11680', 10400' .
SEPTEMBER 05, 1997
CONT POOH & CLEAN REVERSE BASKET REC 2.5 GAL IRON H2S DRILL W/MAN
DN & ERT WAIT ON TOOLS MU BHA #11 & RIH W/SAME CUT & SLIP DRILLING
LINE CONT TIH W/6.125" REVERSING BASKET TAG JUNK 8272' CONT RIH & CIRC
F/8301'-8330' & 8578'-8609' & 10773', 11745', 14216' & CONT RIH TO 19792' CIRC
@ 19707' & DROP BAR & PUMP DN TO CIRC SUB POOH & TIGHT SPOTS @
13481', 12280', 10770'.
SEPTEMBER 06, 1997
CONT POOH & CLEAN OUT REV BASKET & JUNK BASKET REC A SMALL
AMOUNT OF STEEL SLIVERS RIH W/FTA #12 TO 5000' REV CIRC BU @ 7 BPM
500 PSI CONT RIH TO 7000' CIRC BU @ 5 BPM 1900' PSI TIH TO 8000' & REV OUT
TAG OBSTRUCTION @ 8492' WORK & LD 3 JTS & REVERSE OUT @ 4.5 BPM
1900' PSI. CONT RIH TO 16441' & REV OUT EVERY 1000' GETTING LOTS OF IRON
SLIVERS OVER SHAKER (AFTER CHANGING LINES TO BYPASS SHAKER)
SEPTEMBER 07, 1997
CONT RIH W/FTA #12 & REVERSE CIRC OUT EVERY 1000' TO 19252' SLIP
DRILLING LINE. POOH LD DP (DRAG SPOTS ON TOH) 10329', 8914', 8781' REC
NO IRON IN JUNK BASKETS OR GLOBE BASKETS.
SEPTEMBER 08, 1997
RIG HES & RIH W/5.5" MAGNET 4 RUNS WORK TO 8453' & REC SMALL IRON
SHAVING STOPPING DUE TO WELL BORE CHG RAMS TO 4.5" & TEST SAME TO
5000 PSI. MU BAKER PKR W/SCOOP GUIDE 6.125" O.D. & STAB 6 1/8" ON TOP
SUB ABOVE PKR WORK JTS #163, 164 & 165 10' IN ONE EACH JT AS IF IT IS CSG
COLLAR (WIND IS MAKING IT SLOW RUNNING DUE TO STABBING).
SEPTEMBER 09, 1997
CONT TO RIH W/COMPLETION BAKER 7" SAB 3 & PREMATURELY SET @ 9223'
ATTEMPT TO REV CIRC UNABLE DROP 2" SETTING BALL & SET PKR TO 2500
PSI. TEST ANNULUS TO 3500 PSI FOR 30 MIN GOOD TEST & TEST TUBING WAIT
ON ORDERS SHEAR OUT BALL @ 3800 PSI RIG HES WIRE LINE & RIH W/"XN"
Page 5 of 6
SUMMARY OF DALLY OPERATIONS
PLUG STARTED PUMPING @ 4500 PSI PLUG IN XN NIPPLE PROFILE & UNABLE
TO SHEAR OFF. POOH W/PLUG & REDRESS W/SAMLLER KEY STOCK RIH W/"XN"
PLUG & PUMPING DN.
SEPTEMBER 10, 1997
SET PLUG IN "XN" NIPPLE @ 9242' & POOH & TEST TO 3000 PSI BLIND BACK OF
4.5" TUBING @ 548.95' ND BOP'S TIH W/4.5" TBG. 13 JTS & SPACE OUT PUPS
FREEZE PROTECT TO SURFACE W/DIESEL SCREW INTO TUBING & TORQUE &
PU TO 100k RU & TEST TUBING TO 3500 PSI (OK) RU BOWL & SLIPS ON TUBING
HEAD & MU HANGER & LANDING JT & LAND W/80k ON HANGER TEST HANGER
TO 5000 K & MU TREE & TEST TO 5000k. TEST ANNULUS TO 1500 PSI (PER
AOGCC WITNESSED BY JOHN SPAULDING & TEST TO 3500 PER BP) SET BPV &
RIG DOWN CELLAR LINES & SECURE & CLN PITS & MOVING RIG TO MPU F-33.
RIG RELEASED @ 0300 HRS.
Page 6 of 6
SPi
,Y-SUN DRILLING SERVICES
~tNCHOR,AGE ALASKA
7--
BP EXPLORATION
MILNE POINT / MPF-41
500292277000
NORTH SLOPE BOROUGH
COMPUTATION DATE: 6/17/97
DATE OF SURVEY: 060497[~)E(.'~
MWD SURVEY
JOB NUMBER: AK-MM-701
KELLY BUSHING ELEV{aS~
OPERATOR: BP EXPLORATION;~ff~°Tags '
TRUE SUB-SEA
MEASD VERTICAL VERTICAL
DEPTH DEPTH DEPTH
COURS
INCLN
DG MN
COURSE DLS TOTAL
DIRECTION RECTANGULAR COORDINATES
DEGREES DG/100 NORTH/SOUTH EAST/WEST
VERT.
SECT.
.00 .00 -41.30
112.00 112.00 70.70
142.98 142.98 101.68
208.41 208.41 167.11
300.74 300.73 259.43
0 0
0 0
0 12
0 17
1 18
N .00 E .00 .00N .00E
N .00 E .00 .00N .00E
N 59.58 W .68 .03N .05W
N 77.20 E .71 .13N .01E
N 75.64 E 1.10 .44N 1.26E
.00
.00
.00
.11
1.00
392.48 392.42 351.12
483.33 483.17 441.87
573.19 572.85 531.55
665.12 664.45 623.15
760.90 759.64 718.34
2 10
3 14
3 57
5 35
7 0
N 78.20 E .94 1.05N 3.98E
N 77.84 E 1.18 1.95N 8.17E
N 72.96 E .86 3.39N 13.61E
N 72.89 E 1.79 5.64N 20.92E
N 73.99 E 1.48 8.62N 31.01E
2.86
5.69
9.61
15.15
22.69
848.55 846.58 805.28 7 35
939.05 936.05 894.75 9 34
1028.98 1024.45 983.15 11 31
1124.39 1117.61 1076.31 13 19
1220.02 1210.48 1169.18 14 16
1315.64 1302.87 1261.57
1411.27 1394.49 1353.19
1506.79 1484.88 1443.58
1602.55 1575.06 1533.76
1697.62 1664.31 1623.01
15 31
17 45
20 1
19 17
20 58
N 73.05 E .68 11.79N 41.69E
N 72.96 E 2.20 15.74N 54.60E
N 67.61 E 2.42 21.35N 70.07E
N 68.47 E 1.90 29.02N 89.12E
N 66.88 E 1.07 37.70N 110.22E
N 63.78 E 1.55 47.98N 132.55E
N 59.16 E 2.71 61.12N 156.56E
N 51.35 E 3.55 78.80N 181.85E
N 48.62 E 1.22 99.50N 206.51E
N 49.78 E 1.82 120.86N 231.29E
30.67
40.43
52.89
68.90
86.79
106.68
129.88
157.67
187.79
218.54
1793.06 1752.58 1711.28 23 42
1888.83 1839.68 1798.38 25 25
1984.32 1925.10 1883.80 27 37
2078.31 2007.61 1966.31 29 33
2173.86 2089.56 2048.26 32 19
N 50.45 E 2.87 144.11N 259.12E
N 51.88 E 1.90 169.05N 290.13E
N 49.96 E 2.48 195.95N 323.21E
N 50.89 E 2.11 224.60N 357.89E
N 50.66 E 2.89 255.66N 395.94E
252.43
289.35
328.99
370.93
416.64
2269.65 2169.59 2128.29
2364.25 2247.55 2206.25
2459.90 2326.15 2284.85
2555.32 2404.15 2362.85
2650.13 2481.24 2439.94
34 19
34 43
34 45
35 35
35 36
N 48.51 E 2.42 289.78N 435.97E
N 43.86 E 2.82 326.88N 474.62E
N 39.47 E 2.61 367.57N 510.82E
N 36.22 E 2.15 410.96N 544.51E
N 32.68 E 2.17 456.45N 575.72E
465.98
517.25
570.44
624.77
679.71
2745.59 2558.99 2517.69 35 19
2840.72 2635.55 2594.25 37 28
2936.27 2710.16 2668.86 39 49
3031.99 2782.60 2741.30 41 47
3126.55 2851.86 2810.56 44 0
N 33.21 E .44 502.93N 605.84E
N 31.69 E 2.45 550.56N 636.10E
N 31.26 E 2.48 601.44N 667.25E
N 30.73 E 2.10 655.06N 699.45E
N 31.59 E 2.41 710.13N 732.76E
734.98
791.32
850.94
913.46
977.78
', i61NAL
SP~
.Y-SUN DRILLING SERVICES
ANCHORAGE ALASKA
PAGE
BP EXPLORATION
MILNE POINT / MPF-41
500292277000
NORTH SLOPE BOROUGH
COMPUTATION DATE: 6/17/97
DATE OF SURVEY: 060497
MWD SURVEY
JOB NUMBER: AK-MM-70147
KELLY BUSHING ELEV. = 41.30 FT.
OPERATOR: BP EXPLORATION
TRUE SUB-SEA
MEASD VERTICAL VERTICAL
DEPTH DEPTH DEPTH
COURS
INCLN
DG MN
COURSE DLS TOTAL
DIRECTION RECTANGULAR COORDINATES
DEGREES DG/100 NORTH/SOUTH EAST/WEST
VERT.
SECT.
3220.22 2918.20 2876.90
3315.39 2983.14 2941.84
3411.01 3045.62 3004.32
3506.29 3105.17 3063.87
3601.44 3162.24 3120.94
45 47
48 7
50 16
52 20
53 55
N 32.39 E 2.01 766.19N 767.79E
N 30.91 E 2.69 825.40N 804.26E
N 31.08 E 2.25 887.43N 841.53E
N 32.84 E 2.62 950.50N 880.90E
N 31.17 E 2.17 1015.05N 921.23E
1043.81
1113.29
1185.63
1259.89
1335.92
3697.37 3217.14 3175.84 56 13
3792.22 3268.44 3227.14 58 16
3886.69 3316.75 3275.45 60 13
3981.76 3362.11 3320.81 62 46
4076.79 3403.90 3362.60 65 1
N 30.76 E 2.42 1082.49N 961.69E
N 30.46 E 2.17 1151.13N 1002.30E
N 29.40 E 2.28 1221.48N 1042.79E
N 29.06 E 2.71 1294.39N 1083.58E
N 28.19 E 2.51 1369.29N 1124.45E
1414.53
1494.27
1575.43
1658.97
1744.29
4172.40 3442.70 3401.40 67 4
4267.70 3477.57 3436.27 69 59
4363.03 3507.92 3466.62 72 52
4458.40 3533.91 3492.61 75 30
4554.07 3556.08 3514.78 77 41
N 28.19 E 2.14 1446.29N 1165.73E
N 28.53 E 3.07 1524.33N 1207.85E
N 28.91 E 3.04 1603.57N 1251.27E
N 29.47 E 2.81 1683.66N 1296.02E
N 29.29 E 2.31 1764.74N 1341.67E
1831.64
1920.31
2010.66
2102.42
2195.46
4649.45 3576.51 3535.21 77 33
4744.80 3597.12 3555.82 77 28
4840.37 3617.98 3576.68 77 19
4936.02 3639.26 3597.96 76 58
5031.57 3660.39 3619.09 77 28
N 29.55 E .30 1845.90N 1387.44E
N 28.53 E 1.05 1927.28N 1432.62E
N 27.62 E .94 2009.57N 1476.52E
N 30.04 E 2.49 2091.25N 1521.47E
N 30.97 E 1.09 2171.53N 1568.77E
2288.63
2381.72
2474.96
2568.19
2661.35
5127.31 3680.69 3639.39 78 2
5222.32 3700.22 3658.92 78 13
5317.95 3719.59 3678.29 78 24
5413.71 3739.70 3698.40 77 20
5509.17 3760.60 3719.30 77 21
N 30.11 E 1.05 2252.11N 1616.31E
N 29.80 E .38 2332.67N 1662.74E
N 29.74 E .19 2413.96N 1709.24E
N 29.10 E 1.28 2495.51N 1755.23E
N 28.65 E .46 2577.07N 1800.21E
2754.89
2847.86
2941.51
3035.12
3128.26
5604.52 3781.42 3740.11
5700.25 3802.25 3760.95
5795.77 3823.10 3781.80
5890.69 3843.68 3802.38
5986.16 3864.36 3823.06
77 25
77 26
77 20
77 37
77 21
N 29.38 E .75 2658.44N 1845.34E
N 29.51 E .14 2739.81N 1891.27E
N 27.77 E 1.78 2821.61N 1935.94E
N 26.71 E 1.13 2903.99N 1978.35E
N 29.16 E 2.52 2986.32N 2022.01E
3221.31
3314.75
3407.95
3500.55
3593.70
6079.80 3884.41 3843.11 77 54
6171.81 3903.69 3862.39 77 54
6265.57 3924.84 3883.54 76 1
6357.97 3946.73 3905.43 76 34
6451.17 3967.48 3926.18 77 42
N 28.08 E 1.27 3066.60N 2065.82E
N 29.56 E 1.57 3145.42N 2109.18E
N 29.08 E 2.07 3225.05N 2153.91E
N 30.05 E 1.18 3303.13N 2198.20E
N 28.59 E 1.96 3382.34N 2242.68E
3685.16
3775.12
3866.45
3956.21
4047.06
SP1
Y-SUN DRILLING SERVICES
ANCHORAGE ALASKA
PAGE
BP EXPLORATION
MILNE POINT / MPF-41
500292277000
NORTH SLOPE BOROUGH
COMPUTATION DATE: 6/17/97
DATE OF SURVEY: 060497
MWD SURVEY
JOB NUMBER: AK-MM-70147
KELLY BUSHING ELEV. = 41.30 FT.
OPERATOR: BP EXPLORATION
TRUE SUB-SEA
MEASD VERTICAL VERTICAL
DEPTH DEPTH DEPTH
COURS
INCLN
DG MN
COURSE DLS TOTAL
DIRECTION RECTANGULAR COORDINATES
DEGREES DG/100 NORTH/SOUTH EAST/WEST
VERT.
SECT.
6545.32 3988.63 3947.33
6640.01 4011.08 3969.78
6732.83 4033.00 3991.70
6825.21 4054.88 4013.58
6917.53 4077.28 4035.98
76 19
76 14
76 25
76 10
75 45
N 31.14 E 3.02 3461.89N 2288.36E
N 30.11 E 1.06 3541.05N 2335.22E
N 31.10 E 1.06 3618.68N 2381.14E
N 30.66 E .54 3695.70N 2427.20E
N 29.60 E 1.20 3773.16N 2472.15E
4138.79
4230.75
4320.92
4410.63
4500.18
7013 . 27 4099 . 85 4058 . 55
7107 . 15 4121 . 05 4079 . 75
7200.98 4142 . 41 4101.11
7294 . 74 4163 . 68 4122 . 38
7387.64 4184.45 4143.15
76 58
76 55
76 45
77 0
77 9
N 30.88 E 1.83 3853.53N 2519.01E
N 29.35 E 1.59 3932.63N 2564.89E
N 30.40 E 1.10 4011.86N 2610.40E
N 29.32 E 1.15 4091.04N 2655.86E
N 29.39 E .17 4169.97N 2700.25E
4593.20
4684.63
4775.99
4867.30
4957.84
7481.83 4205.47 4164.17
7576.04 4226.60 4185.30
7669.30 4248.01 4206.71
7762.61 4269.97 4228.67
7855.39 4291.41 4250.11
77 4
77 0
76 27
76 19
76 57
N 29.07 E .34 4250.09N 2745.08E
N 29.35 E .30 4330.22N 2789.89E
N 27.13 E 2.39 4410.17N 2832.83E
N 28.77 E 1.71 4490.28N 2875.33E
N 29.68 E 1.18 4569.05N 2919.40E
5049.66
5141.47
5232.20
5322.86
5413.13
7948.35 4312.55 4271.25
8042.99 4332.92 4291.62
8135.83 4352.35 4311.05
8230.49 4373.27 4331.97
8323.73 4394.94 4353.64
76 44
78 24
77 26
77 1
76 6
N 28.41 E 1.35 4648.18N 2963.35E
N 29.10 E 1.89 4729.20N 3007.81E
N 28.53 E 1.20 4808.74N 3051.56E
N 28.33 E .49 4889.92N 3095.51E
N 27.16 E 1.56 4970.18N 3137.73E
5503.64
5596.05
5686.82
5779.13
5869.78
8416.47 4417.09 4375.79
8509.83 4438.80 4397.50
8603.00 4460.13 4418.83
8697.49 4481.24 4439.94
8790.85 4501.71 4460.41
76
76
76
77
77
15
51
4O
30
9
N 27.75 E .64 5050.09N 3179.25E
N 27.99 E .70 5130.35N 3221.70E
N 28.34 E .42 5210.31N 3264.50E
N 28.44 E .89 5291.33N 3308.30E
N 29.78 E 1.45 5370.91N 3352.60E
5959.79
6050.56
6141.24
6233.33
6324.41
8881.70 4521.78 4480.48
8977.83 4542.48 4501.18
9070.92 4562.64 4521.34
9164.76 4583.63 4542.33
9244.65 4601.16 4559.86
77
77
77
76
77
18
49
9
59
39
N 30.56 E .85 5447.51N 3397.13E
N 32.03 E 1.58 5527.72N 3445.89E
N 30.63 E 1.63 5605.34N 3493.14E
N 33.09 E 2.56 5683.00N 3541.41E
N 31.39 E 2.24 5748.92N 3582.98E
6413.00
6506.81
6597.62
6688.97
6766.80
9332.83 4619.56 4578.26
9426.96 4639.14 4597.84
9522.46 4659.76 4618.46
9617.76 4681.15 4639.85
9713.48 4702.61 4661.31
78 15
77 43
77 20
76 43
77 20
N 31.51 E .69 5822.49N 3627.98E
N 31.10 E .71 5901.16N 3675.82E
N 30.44 E .78 5981.27N 3723.52E
N 29.97 E .80 6061.53N 3770.24E
N 29.20 E 1.02 6142.65N 3816.30E
6852.98
6944.99
7038.20
7131.06
7224.33
SPi
.Y-SUN DRILLING SERVICES
ANCHOR_AGE ALASKA
PAGE
BP EXPLOR3~TION
MILNE POINT / MPF-41
500292277000
NORTH SLOPE BOROUGH
COMPUTATION DATE: 6/17/97
DATE OF SURVEY: 060497
MWD SURVEY
JOB NUMBER: AK-MM-70147
KELLY BUSHING ELEV. = 41.30
OPERATOR: BP EXPLOP~ATION
FT.
TRUE SUB-SEA
MEASD VERTICAL VERTICAL
DEPTH DEPTH DEPTH
COURS
INCLN
DG MN
COURSE DLS TOTAL
DIRECTION RECTANGULAR COORDINATES
DEGREES DG/100 NORTH/SOUTH EAST/WEST
VERT.
SECT.
9806.20 4723.30 4682.00 76 52
9904.66 4745.08 4703.78 77 34
9999.25 4765.84 4724.54 77 4
10095.21 4786.59 4745.29 77 56
10190.40 4806.02 4764.72 78 29
N 28.45 E .94 6221.83N 3859.87E
N 27.89 E .90 6306.48N 3905.20E
N 27.16 E .92 6388.31N 3947.85E
N 26.92 E .95 6471.76N 3990.44E
N 27.74 E 1.02 6554.54N 4033.22E
7314.71
7410.71
7502.95
7596.56
7689.69
10285.90 4824.99 4783.69 78
10381.51 4844.04 4802.74 78
10476.22 4863.47 4822.17 77
10569.72 4882.83 4841.53 78
10664.50 4902.08 4860.78 78
35
24
55
10
22
N 28.18 E .47 6637.21N 4077.10E
N 29.37 E 1.24 6719.33N 4122.20E
N 28.57 E .98 6800.42N 4167.10E
N 28.94 E .48 6880.62N 4211.10E
N 30.11 E 1.23 6961.37N 4256.83E
7783.26
7876.95
7969.64
8061.11
8153.91
10760.33 4921.86 4880.56 77 47
10855.89 4942.53 4901.23 77 13
10951.01 4962.92 4921.62 78 0
11046.70 4983.12 4941.82 77 37
11141.46 5003.31 4962.01 77 46
N 29.60 E .81 7042.68N 4303.51E
N 28.91 E .92 7124.08N 4349.10E
N 29.99 E 1.38 7204.98N 4394.78E
N 28.97 E 1.12 7286.40N 4440.81E
N 30.21 E 1.29 7366.90N 4486.53E
8247.66
8340.96
8433.86
8527.39
8619.97
11235.96 5023.52 4982.22
11333.91 5044.67 5003.37
11428.50 5065.30 5024.00
11524.34 5086.69 5045.39
11619.42 5108.60 5067.31
77 31
77 32
77 15
76 56
76 24
N 29.38 E .90 7447.01N 4532.40E
N 30.57 E 1.19 7529.85N 4580.18E
N 30.55 E .30 7609.34N 4627.11E
N 30.51 E .33 7689.81N 4674.57E
N 29.57 E 1.12 7769.90N 4720.88E
8712.28
8807.90
8900.19
8993.59
9086.10
11714.94 5131.58 5090.28 75 46
11810.15 5154.33 5113.03 76 34
11905.75 5176.31 5135.01 76 49
12000.98 5198.17 5156.87 76 37
12096.55 5219.83 5178.53 77 10
N 28.33 E 1.42 7851.03N 4765.76E
N 28.81 E .98 7932.22N 4809.97E
N 30.14 E 1.38 8013.21N 4855.75E
N 28.80 E 1.39 8093.90N 4901.35E
N 30.53 E 1.85 8174.77N 4947.41E
9178.81
9271.25
9364.28
9456.96
9550.03
12191.96 5241.12 5199.82
12287.66 5262.63 5221.33
12382.82 5284.34 5243.04
12478.63 5306.78 5265.48
12574.27 5328.78 5287.48
77 3
76 58
76 39
76 15
77 8
N 29.93 E .63 8255.13N 4994.24E
N 30.09 E .18 8335.88N 5040.88E
N 29.45 E .74 8416.30N 5086.88E
N 28.78 E .79 8497.67N 5132.20E
N 29.14 E .99 8579.10N 5177.26E
9643.02
9736.27
9828.91
9922.05
10015.12
12669.16 5349.68 5308.38 77 24
12764.51 5370.64 5329.34 77 11
12858.25 5391.61 5350.31 76 56
12950.97 5412.70 5371.40 76 46
13044.22 5434.22 5392.92 76 32
N 30.51 E 1.44 8659.40N 5223.30E
N 30.01 E .56 8739.74N 5270.17E
N 29.29 E .80 8819.14N 5315.37E
N 29.56 E .34 8897.78N 5359.72E
N 28.33 E 1.31 8977.18N 5403.63E
10107.67
10200.68
10292.04
10382.33
10473.05
.Y-SUN DRILLING SERVICES
ANCHORAGE ALASKA
PAGE
BP EXPLORATION
MILNE POINT / MPF-41
500292277000
NORTH SLOPE BOROUGH
COMPUTATION DATE: 6/17/97
DATE OF SURVEY: 060497
MWD SURVEY
JOB NUMBER: AK-MM-70147
KELLY BUSHING ELEV. = 41.30 FT.
OPERATOR: BP EXPLORATION
TRUE SUB-SEA
MEASD VERTICAL VERTICAL
DEPTH DEPTH DEPTH
COURS
INCLN
DG MN
COURSE DLS TOTAL
DIRECTION RECTANGULAR COORDINATES
DEGREES DG/100 NORTH/SOUTH EAST/WEST
VERT.
SECT.
13136.23 5455.62 5414.32 76
13230.17 5477.49 5436.19 76
13324.25 5499.61 5458.31 76
13418.15 5522.18 5480.88 75
13510.25 5544.47 5503.17 76
33
31
16
54
4
N 29.51 E 1.25 9055.50N 5446.91E
N 28.56 E .98 9135.37N 5491.25E
N 28.40 E .30 9215.75N 5534.85E
N 28.00 E .57 9296.08N 5577.92E
N 29.19 E 1.27 9374.54N 5620.69E
10562.53
10653.89
10745.32
10836.45
10925.80
13603.54 5567.15 5525.85 75 47
13696.95 5589.68 5548.38 76 18
13791.05 5611.96 5570.66 76 18
13884.67 5634.39 5593.09 75 57
13977.78 5656.46 5615.16 76 37
N 28.87 E .45 9453.66N 5664.60E
N 27.84 E 1.20 9533.43N 5707.65E
N 28.88 E 1.07 9613.88N 5751.08E
N 28.53 E .52 9693.60N 5794.73E
N 29.17 E .97 9772.83N 5838.38E
11016.29
11106.93
'11198.34
11289.22
11379.67
14071.52 5678.51 5637.21 76 10
14165.08 5700.37 5659.07 76 48
14258.69 5721.92 5680.62 76 34
14353.18 5743.14 5701.84 77 28
14446.62 5763.73 5722.43 77 4
N 28.53 E .82 9852.63N 5882.34E
N 29.62 E 1.32 9932.13N 5926.55E
N 29.05 E .65 10011.54N 5971.18E
N 30.19 E 1.51 10091.58N 6016.68E
N 29.18 E 1.14 10170.75N 6061.82E
11470.78
11561.74
11652.84
11744.90
11836.04
14539.87 5785.09 5743.79
14632.69 5806.23 5764.93
14725.61 5827.00 5785.70
14819.89 5848.56 5807.26
14913.94 5869.62 5828.32
76 26
77 14
76 55
76 38
77 28
N 29.09 E .68 10250.04N 6106.01E
N 29.69 E 1.07 10328.78N 6150.36E
N 29.75 E .35 10407.44N 6195.26E
N 29.21 E .63 t0487.33N 6240.43E
N 29.53 E .95 10567.21N 6285.39E
11926.81
12017.19
12107.75
12199.53
12291.19
15008.63 5890.25 5848.95 77 21
15101.85 5910.81 5869.51 77 9
15194.98 5931.71 5890.41 76 54
15289.33 5952.75 5911.45 77 19
15381.62 5973.28 5931.98 76 58
N 29.00 E .56 10647.83N 6330.56E
N 28.69 E .40 10727.47N 6374.43E
N 28.59 E .28 10807.12N 6417.93E
N 29.26 E .82 10887.62N 6462.41E
N 28.65 E .74 10966.35N 6505.97E
12383.60
12474.53
12565.27
12657.24
12747.22
15474.26 5993.89 5952.59 77
15567.71 6014.69 5973.39 76
15661.06 6035.43 5994.13 77
15755.17 6056.14 6014.84 77
15849.59 6077.23 6035.93 76
18
58
21
12
58
N 29.34 E .81 11045.35N 6549.75E
N 29.29 E .37 11124.79N 6594.36E
N 30.22 E 1.06 11203.80N 6639.53E
N 29.77 E .49 11283.31N 6685.42E
N 29.66 E .27 11363.24N 6731.04E
12837.53
12928.64
13019.65
13111.44
13203.48
15942.78 6098.26 6056.96
16038.36 6120.19 6078.89
16134.01 6142.17 6100.87
16229.58 6164.23 6122.93
16325.32 6186.52 6145.22
76
76
76
76
76
55
32
53
25
39
N 29.53 E .15 11442.18N 6775.88E
N 28.59 E 1.04 11523.50N 6821.06E
N 29.19 E .71 11605.00N 6866.04E
N 27.74 E 1.56 11686.74N 6910.35E
N 29.61 E 1.92 11768.42N 6955.03E
13294.26
13387.29
13480.37
13573.34
13666.44
SP1
Y-SUN DRILLING SERVICES
ANCHORAGE ALASKA
PAGE
BP EXPLORATION
MILNE POINT / MPF-41
500292277000
NORTH SLOPE BOROUGH
COMPUTATION DATE: 6/17/97
DATE OF SURVEY: 060497
MWD SURVEY
JOB NUMBER: AK-MM-70147
KELLY BUSHING ELEV. = 41.30 FT.
OPERATOR: BP EXPLORATION
TRUE SUB-SEA
MEASD VERTICAL VERTICAL
DEPTH DEPTH DEPTH
16420.79 6208.70 6167.40
16516.11 6231.17 6189.87
16611.77 6252.99 6211.69
16707.62 6274.63 6233.33
16803.46 6295.93 6254.63
COURS
INCLN
DG MN
COURSE DLS TOTAL
DIRECTION RECTANGULAR COORDINATES
DEGREES DG/100 NORTH/SOUTH EAST/WEST
76 28 N 29.91 E .36 11849.03N 7001
76 15 N 29.05 E .90 11929.67N 7046
77 21 N 29.74 E 1.35 12010.80N 7092
76 33 N 29.86 E .85 12091.83N 7138
77 45 N 30.18 E 1.30 12172.73N 7185
VERT.
SECT.
.12E 13759.29
.70E 13851.92
.42E 13945.05
.82E 14038.42
.57E 14131.85
16899.03 6316.51 6275.21
16993.72 6337.38 6296.08
17089.27 6358.65 6317.35
17185.24 6380.00 6338.70
17280.84 6401.33 6360.03
77 22 N 30.08 E .42 12253.45N 7232
77 10 N 29.94 E .26 12333.43N 7278
77 5 N 29.58 E .37 12414.30N 7324
77 11 N 29.84 E .28 12495.56N 7371
77 0 N 29.25 E .63 12576.63N 7417
.41E 14225.17
.61E 14317.52
.85E 14410.67
.22E 14504.23
.17E 14597.42
17376.36 6422.96 6381.66
17471.57 6444.57 6403.27
17567.01 6467.60 6426.31
17661.88 6493.06 64.51.76
17757.39 6521.24 6479.94
76 49 N 28.95 E .36 12657.93N 7462
76 56 N 28.78 E .21 12739.13N 7507
75 7 N 30.14 E 2.36 12819.76N 7552
73 45 N 29.04 E 1.83 12899.22N 7597
71 55 N 29.24 E 1.93 12978.92N 7642
.42E 14690.46
.18E 14783.18
.72E 14875.78
.84E 14967.16
.27E 15058.40
17852.68 6552.33 6511.03
17948.14 6586.79 6545.49
18044.63 6625.47 6584.17
18140.53 6667.86 6626.56
18235.99 6714.08 6672.78
69 59 N 30.27 E 2.27 13057.10N 7686
67 40 N 31.17 E 2.57 13133.62N 7732
65 3 N 31.99 E 2.83 13208.92N 7778
62 28 N 32.02 E 2.68 13281.86N 7824
59 35 N 32.21 E 3.02 13352.60N 7868
.96E 15148.45
.43E 15237.43
.71E 15325.75
.29E 15411.66
.69E 15495.07
18331.85 6764.86 6723.56
18425.53 6818.95 6777.65
18523.57 6880.33 6839.03
18618.60 6944.33 6903.03
18714.72 7013.04 6971.74
56 25 N 31.90 E 3.33 13421.49N 7911
53 1 N 31.66 E 3.62 13486.49N 7952
49 25 N 30.22 E 3.85 13552.03N 7991
45 53 N 28.67 E 3.92 13613.17N 8025
42 50 N 28.92 E 3.18 13672.07N 8058
.84E 15576.27
.lie 15652.67
.43E 15729.05
.97E 15799.28
.34E 15866.48
18811.13 7085.25 7043.95
18904.97 7157.66 7116.36
19000.63 7232.40 7191.10
19095.64 7307.29 7265.99
19190.47 7382.75 7341.45
40 8 N 29.57 E 2.84 13727.80N 8089
38 51 N 29.16 E 1.39 13779.81N 8118
38 22 N 28.95 E .53 13832.00N 8147
37 34 N 27.55 E 1.23 13883.49N 8175
36 58 N 26.74 E .83 13934.59N 8201
.53E 15930.34
.80E 15990.03
.79E 16049.73
.47E 16108.18
.67E 16165.57
19285.97 7459.27 7417.97
19381.51 7536.23 7494.93
19477.14 7613.52 7572.22
19574.09 7691.67 7650.37
19668.98 7767.98 7726.68
36 32 N 26.53 E .47 13985.67N
36 7 N 25.80 E .63 14036.47N
36 2 N 25.80 E .07 14087.18N
36 30 N 25.84 E .48 14138.82N
36 25 N 26.32 E .31 14189.48N
8227.29E 16222.65
8252.25E 16279.17
8276.77E 16335.39
8301.75E 16392.65
8326.54E 16448.96
SP! Y-SUN DRILLING SERVICES
ANCHORAGE ALASKA
PAGE 7
BP EXPLORATION
MILNE POINT / MPF-41
500292277000
NORTH SLOPE BOROUGH
COMPUTATION DATE: 6/17/97
DATE OF SURVEY: 060497
MWD SURVEY
JOB NUMBER: AK-MM-70147
KELLY BUSHING ELEV. = 41.30 FT.
OPERATOR: BP EXPLOP~ATION
TRUE SUB-SEA COURS COURSE DLS TOTAL
MEASD VERTICAL VERTICAL INCLN DIRECTION RECTANGULAR COORDINATES VERT.
DEPTH DEPTH DEPTH DG MN DEGREES DG/100 NORTH/SOUTH EAST/WEST SECT.
19764.33 7844.72 7803.42 36 24 N 26.36 E
19827.21 7895.29 7853.99 36 31 N 26.45 E
19893.00 7948.16 7906.86 36 31 N 26.45 E
.04 14240.20N 8351.66E 16505.48
.21 14273.67N 8368.27E 16542.80
.00 14308.72N 8385.71E 16581.91
THE CALCULATION PROCEDURES ARE BASED ON THE USE OF
THREE-DIMENSION MINIMUM CURVATURE METHOD.
HORIZONTAL DISPLACEMENT = 16584.92 FEET
AT NORTH 30 DEG. 22 MIN. EAST AT MD = 19893
VERTICAL SECTION RELATIVE TO WELL HEAD
VERTICAL SECTION COMPUTED ALONG 29.28 DEG.
TIE-IN SURVEY AT SURFACE 0.00' MD
PROJECTED SURVEY AT 19,893.00' MD
SPt
~-SUN DRILLING SERVICES
ANCHORAGE ALASKA
PAGE
BP EXPLORATION
MILNE POINT / MPF-41
500292277000
NORTH SLOPE BOROUGH
COMPUTATION DATE: 6/17/97
DATE OF SURVEY: 060497
JOB NUMBER: AK-MM-70147
KELLY BUSHING ELEV. = 41.30 FT.
OPERATOR: BP EXPLORATION
INTERPOLATED VALUES FOR EVEN 1000 FEET OF MEASURED DEPTH
TRUE SUB-SEA
MEASD VERTICAL VERTICAL
DEPTH DEPTH DEPTH
TOTAL
RECTANGULAR COORDINATES
NORTH/SOUTH EAST/WEST
MD-TVD VERTICAL
DIFFERENCE CORRECTION
.00 .00 -41.30 .00 N .00 E
1000.00 996.05 954.75 19.15 N 64.71 E
2000.00 1938.99 1897.69 200.63 N 328.78 E
3000.00 2758.75 2717.45 636.73 N 688.56 E
4000.00 3370.45 3329.15 1308.57 N 1091.46 E
.00
3.95 3.95
61.01 57.06
241.25 180.24
629.55 388.31
5000.00 3653.54 3612.24 2145.11 N 1552.91 E
6000.00 3867.39 3826.09 2998.11 N 2028.59 E
7000.00 4096.86 4055.56 3842.43 N 2512.37 E
8000.00 4324.28 4282.98 4692.40 N 2987.33 E
9000.00 4547.16 4505.86 5546.09 N 3457.39 E
1346.46 716.90
2132.61 786.16
2903.14 770.53
3675.72 772.58
4452.84 777.12
10000.00 4766.01 4724.71 6388.96 N 3948.18 E
11000.00 4973.11 4931.81 7246.49 N 4418.72 E
12000.00 5197.94 5156.64 8093.06 N 4900.89 E
13000.00 5423.93 5382.63 8939.32 N 5383.23 E
14000.00 5661.60 5620.30 9791.70 N 5848.92 E
5233.99 781.15
6026.89 792.90
6802.06 775.17
7576.07 774.01
8338.40 762.33
15000.00 5888.36 5847.06 10640.47 N 6326.48 E
16000.00 6111.26 6069.96 11490.74 N 6803.21 E
17000.00 6338.77 6297.47 12338.74 N 7281.66 E
18000.00 6607.08 6565.78 13174.36 N 7757.28 E
19000.00 7231.91 7190.61 13831.66 N 8147.60 E
9111.64 773.24
9888.74 777.09
10661.23 772.49
11392.92 731.69
11768.09 375.17
19893.00 7948.16 7906.86 14308.72 N 8385.71 E 11944.84
176.74
THE CALCULATION PROCEDURES ARE BASED ON THE USE OF
THREE-DIMENSION MINIMUM CURVATURE METHOD.
SPt
Y-SUN DRILLING SERVICES
ANCHORAGE ALASKA
PAGE
BP EXPLORATION
MILNE POINT / MPF-41
500292277000
NORTH SLOPE BOROUGH
COMPUTATION DATE: 6/17/97
DATE OF SURVEY: 060497
JOB NIJMBER: AK-MM-70147
KELLY BUSHING ELEV. = 41.30 FT.
OPERATOR: BP EXPLORATION
INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH
TRUE SUB-SEA
MEASD VERTICAL VERTICAL
DEPTH DEPTH DEPTH
TOTAL
RECTANGULAR COORDINATES
NORTH/SOUTH EAST/WEST
MD-TVD VERTICAL
DIFFERENCE CORRECTION
.00 .00 -41
41.30 41.30
141.30 141.30 100
241.30 241.30 200
341.32 341.30 300
.30 .00 N .00
.00 .00 N .00
.00 .03 N .04
.00 .17 N .18
.00 .67 N 2.17
E .00
E .00 .00
W .00 .00
E .00 .00
E .02 .02
441.40 441.30 400
541.57 541.30 500
641.86 641.30 600
742.42 741.30 700
843.22 841.30 800
.00
.00
.00
.00
.00
1.45 N 5.85
2.75 N 11.53
4.97 N 18.76
8.00 N 28.84
11.58 N 41.01
E .10 .07
E .27 .17
E .56 .29
E 1.12 .56
E 1.92 .80
944.37 941.30
1046.18 1041.30
1148.73 1141.30
1251.83 1241.30
1355.62 1341.30
9OO
1000
1100
1200
1300
.00
.00
.00
.00
.00
16.00 N 55.45
22.66 N 73.25
31.08 N 94.34
40.78 N 117.43
53.05 N 142.34
E 3.07 1.15
E 4.88 1.81
E 7.43 2.56
E 10.53 3.09
E 14.32 3.79
1460.57 1441.30
1566.79 1541.30
1672.98 1641.30
1780.76 1741.30
1890.63 1841.30
1400
1500
1600
1700
1800
.00
.00
.00
.00
.00
69.57 N 169.55
91.69 N 197.65
115.17 N 224.55
140.98 N 255.34
169.53 N 290.74
E 19.27 4.96
E 25.48 6.21
E 31.68 6.19
E 39.46 7.78
E 49.33 9.87
2002.61 1941.30
2117.26 2041.30
2235.40 2141.30
2356.65 2241.30
2478.33 2341.30
1900
2000
2100
2200
2300
.00
.00
.00
.00
.00
201.40 N 329.70
236.95 N 373.05
277.01 N 421.51
323.78 N 471.60
375.68 N 517.50
E 61.31 11.98
E 75.96 14.66
E 94.10 18.14
E 115.35 21.25
E 137.03 21.68
2601.00 2441.30
2723 · 91 2541 . 30
2847.96 2641.30
2976 . 81 2741.30
3111.87 2841.30
2400
2500
2600
2700
2800
.00
.00
.00
.00
.00
432.43 N 560.20
492.44 N 598.97
554.31 N 638.42
623.63 N 680.72
701.44 N 727.42
E 159.70 22.67
E 182.61 22.91
E 206.66 24.05
E 235.51 28.85
E 270.57 35.06
3253.35 2941.30
3404.26 3041.30
3565.88 3141.30
3740.87 3241.30
3937.20 3341.30
2900.00
3000.00
3100.00
3200.00
3300.00
786.25 N 780.51
882.98 N 838.85
990.46 N 906.35
1113.57 N 980.18
1259.97 N 1064.39
E 312.05 41.48
E 362.96 50.90
E 424.58 61.62
E 499.57 74.99
E 595.90 96.33
SP1
Y-SUN DRILLING SERVICES
ikNCHOP3kGE ALASKA
PAGE 10
BP EXPLORATION
MILNE POINT / MPF-41
500292277000
NORTH SLOPE BOROUGH
COMPUTATION DATE: 6/17/97
DATE OF SURVEY: 060497
JOB NUMBER: AK-MM-70147
KELLY BUSHING ELEV. = 41.30 FT.
OPERATOR: BP EXPLORATION
INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH
TRUE SUB-SEA
MEASD VERTICAL VERTICAL
DEPTH DEPTH DEPTH
TOTAL
RECTANGULAR COORDINATES
NORTH/SOUTH EAST/WEST
MD-TVD VERTICAL
DIFFERENCE CORRECTION
4168.83 3441.30 3400.00
4487.91 3541.30 3500.00
4945.07 3641.30 3600.00
5421.01 3741.30 3700.00
5879.59 3841.30 3800.00
1443.40 N
1708.54 N
2098.88 N
2501.73 N
2894.31 N
1164.17 E 727.53 131.63
1310.08 E 946.61 219.08
1525.88 E 1303.77 357.15
1758.69 E 1679.71 375.94
1973.48 E 2038.29 358.59
6334.57 3941.30 3900.00
6768.18 4041.30 4000.00
7196.14 4141.30 4100.00
7640.64 4241.30 4200.00
8084.46 4341.30 4300.00
3283.43 N
3648.10 N
4007.79 N
4385.38 N
4764.70 N
2186.80 E 2393.27 354.98
2398.88 E 2726.88 333.61
2608.02 E 3054.84 327.96
2820.13 E 3399.34 344.50
3027.54 E 3743.16 343.82
8520.84 4441.30 4400.00
8972.24 4541.30 4500.00
9437.10 4641.30 4600 . 00
9887 . 12 4741 . 30 4700 . 00
10367 . 86 4841 . 30 4800 . 00
5139.82 N
5523.08 N
5909.64 N
6291.34 N
6707.67 N
3226.73 E 4079.54 336.38
3442.99 E 4430.94 351.40
3680.93 E 4795.80 364.86
3897.19 E 5145.82 350.02
4115.64 E 5526.56 380.73
10850.32 4941.30 4900.00
11318.29 5041.30 5000.00
11754.50 5141.30 5100.00
12192.78 5241.30 5200.00
12630.72 5341.30 5300.00
7119.33 N
7516.72 N
7884.78 N
8255.82 N
8627.06 N
4346.48 E 5909.02 382.47
4572.42 E 6276.99 367.97
4783.96 E 6613.20 336.21
4994.64 E 6951.48 338.28
5204.26 E 7289.42 337.93
13074.63 5441.30 5400.00
13497.07 5541.30 5500.00
13913.14 5641.30 5600.00
14344.70 5741.30 5700.00
14788.46 5841.30 5800.00
9003.21 N
9363.36 N
9717.87 N
10084.43 N
10460.64 N
5417.67 E 7633.33 343.91
5614.45 E 7955.77 322.44
5807.93 E 8271.84 316.08
6012.52 E 8603.40 331.56
6225.51 E 8947.16 343.76
15237.31 5941.30 5900.00
15687.91 6041.30 6000.00
16130.17 6141.30 6100.00
16558.77 6241.30 6200.00
17011.38 6341.30 6300.00
10843.33 N
11226.43 N
11601.73 N
11965.90 N
12348.36 N
6437.66 E 9296.01 348.85
6652.71 E 9646.61 350.60
6864.21 E 9988.87 342.26
7066.83 E 10317.47 328.60
7287.20 E 10670.08 352.61
17457.11 6441.30 6400.00
17820.44 6541.30 6500.00
18081.46 6641.30 6600.00
18288.39 6741.30 6700.00
18462.11 6841.30 6800.00
12726.78 N 7500.40 E 11015.81 345.73
13030.94 N 7671.69 E 11279.14 263.33
13237.12 N 7796.33 E 11440.16 161.02
13390.51 N 7892.50 E 11547.09 106.93
13511.21 N 7967.20 E 11620.81 73.72
SP~
JY-SUN DRILLING SERVICES
ANCHOR_AGE ALASKA
PAGE 11
BP EXPLORATION
MILNE POINT / MPF-41
500292277000
NORTH SLOPE BOROUGH
COMPUTATION DATE: 6/17/97
DATE OF SURVEY: 060497
JOB NUMBER: AK-MM-70147
KELLY BUSHING ELEV. = 41.30
OPERATOR: BP EXPLORATION
FT.
INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH
TRUE SUB-SEA
MEASD VERTICAL VERTICAL
DEPTH DEPTH DEPTH
TOTAL
RECTANGULAR COORDINATES
NORTH/SOUTH EAST/WEST
MD-TVD VERTICAL
DIFFERENCE CORRECTION
18614.21 6941.30 6900.00 13610.39 N 8024.44 E
18752.91 7041.30 7000.00 13694.52 N 8070.81 E
18883.96 7141.30 7100.00 13768.30 N 8112.38 E
19011.98 7241.30 7200.00 13838.17 N 8151.20 E
19138.55 7341.30 7300.00 13906.69 N 8187.57 E
11672.91 52.10
11711.61 38.70
11742.67 31.05
11770.68 28.02
11797.25 26.57
19263.61 7441.30 7400.00 13973.76 N 8221.35 E
19387.78 7541.30 7500.00 14039.80 N 8253.86 E
19511.50 7641.30 7600.00 14105.39 N 8285.57 E
19635.82 7741.30 7700.00 14171.83 N 8317.82 E
19760.08 7841.30 7800.00 14237.94 N 8350.54 E
11822.31 25.06
11846.48 24.17
11870.20 23.72
11894.52 24.32
11918.78 24.26
19893.00 7948.17 7906.87 14308.72 N 8385.71 E 11944.83
26.05
THE CALCULATION PROCEDURES USE A LINEAR INTERPOLATION BETWEEN
THE NEAREST 20 FOOT MD (FROM MINIMUM CURVATURE) POINTS
SPk .Y-SI/N DRILLING SERVICES
AlqCHOR_AGE ALASKA
PAGE
BP EXPLORATION
MILNE POINT / MPF-41
500292277000
NORTH SLOPE BOROUGH
COMPUTATION DATE: 6/11/97
DATE OF SURVEY: 060597
MAGNETIC MULTI-SHOT SURVEY
JOB NIZ~BER: AK-EI-70162
KELLY BUSHING ELEV. = 41.30
OPERATOR: BP EXPLORATION
FT.
TRUE SUB-SEA
MEASD VERTICAL VERTICAL
DEPTH DEPTH DEPTH
COURS
INCLN
DG MN
COURSE DLS TOTAL
DIRECTION RECTANGULAR COORDINATES
DEGREES DG/100 NORTH/SOUTH EAST/WEST
VERT.
SECT.
9332.83 4619.84 4578.54
9445.67 4642.90 4601.60
9541.32 4662.86 4621.56
9636.04 4683.69 4642.39
9731.82 4704.96 4663.66
78 15 N 31.51 E .00 5822.81N 3628.18E
78 9 N 31.18 E .30 5917.15N 3685.64E
77 45 N 30.85 E .54 5997.32N 3733.83E
76 50 N 29.75 E 1.48 6077.09N 3780.45E
77 30 N 28.78 E 1.20 6158.56N 3826.10E
6853.35
6963.74
7057.24
7149.62
7243.00
9827.08 4726.23 4684.93
9921.93 4747.28 4705.98
10017.65 4768.14 4726.84
10112.88 4788.62 4747.32
10208.57 4808.01 4766.71
76 41 N 28.16 E 1.06 6240.18N 3870.36E
77 40 N 27.91 E 1.06 6321.81N 3913.83E
77 9 N 27.45 E .72 6404.54N 3957.22E
78 0 N 27.52 E .91 6487.04N 4000.14E
78 36 N 27.88 E .72 6570.00N 4043.70E
7335.84
7428.30
7521.68
7614.64
7708.30
10304.15 4826.85 4785.55
10398.89 4845.63 4804.33
10494.44 4865.24 4823.94
10589.42 4884.83 4843.53
10685.02 4903.97 4862.67
78 39 N 28.78 E .93 6652.48N 4088.16E
78 28 N 29.26 E .52 6733.68N 4133.21E
77 50 N 28.79 E .82 6815.45N 4178.58E
78 20 N 29.42 E .84 6896.65N 4223.79E
78 33 N 30.24 E .87 6977.90N 4270.39E
7801.99
7894.85
7988.36
8081.30
8174.96
10780.61 4923.60 4882.30
10875.69 4944.11 4902.81
10971.44 4964.55 4923.25
11066.18 4984.50 4943.20
11160.62 5004.56 4963.26
77 45 N 29.74 E .97 7058.92N 4317.15E
77 19 N 29.38 E .59 7139.68N 4362.96E
78 1 N 29.96 E .94 7220.95N 4409.26E
77 39 N 29.44 E .66 7301.40N 4455.15E
77 48 N 30.00 E .60 7381.54N 4500.90E
8268.50
8361.34
8454.88
8547.49
8639.77
11255.62 5024.81 4983.51
11350.60 5045.10 5003.80
11446.29 5065.71 5024.42
11541.61 5086.95 5045.65
11637.03 5109.21 5067.91
77 34 N 29.59 E .49 7462.09N 4547.02E
77 45 N 30.62 E 1.08 7542.36N 4593.55E
77 21 N 30.37 E .49 7622.88N 4640.97E
76 54 N 29.88 E .70 7703.25N 4687.61E
76 7 N 29.52 E .89 7783.85N 4733.58E
8732.58
8825.35
8918.78
9011.69
9104.47
11732.26 5132.50 5091.20
11827.89 5155.51 5114.21
11923.20 5177.40 5136.10
12018.66 5199.14 5157.84
12114.34 5220.90 5179.60
75 33 N 28.35 E 1.33 7864.65N 4778.26E
76 35 N 29.00 E 1.27 7946.08N 4822.80E
76 50 N 29.83 E .88 8026.88N 4868.36E
76 49 N 29.57 E .27 8107.62N 4914.41E
76 52 N 30.08 E .53 8188.45N 4960.76E
9196.80
9289.61
9382.37
9475.32
9568.49
12209.77 5242.46 5201.16
12305.16 5264.19 5222.89
12400.78 5286.58 5245.29
12496.47 5308.35 5267.05
12591.43 5328.83 5287.53
77 0 N 29.73 E .38 8269.03N
76 40 N 29.42 E .47 8349.81N
76 14 N 28.58 E .97 8431.11N
77 28 N 29.42 E 1.55 8512.60N
77 36 N 29.54 E .19 8593.32N
5007.11E 9661.44
5052.95E 9754.32
5098.02E 9847.28
5143.20E 9940.45
5188.83E 10033.18
SP1
Y-SUN DRILLING SERVICES
ANCHO1LAGE ALASKA
PAGE
BP EXPLORATION
MILNE POINT / MPF-41
500292277000
NORTH SLOPE BOROUGH
COMPUTATION DATE: 6/11/97
DATE OF SURVEY: 060597
MAGNETIC MULTI-SHOT SURVEY
JOB NUMBER: AK-EI-70162
KELLY BUSHING ELEV. = 41.30 FT.
OPERATOR: BP EXPLORATION
TRUE SUB-SEA
MEASD VERTICAL VERTICAL
DEPTH DEPTH DEPTH
COURS
INCLN
DG MN
COURSE DLS TOTAL
DIRECTION RECTANGULAR COORDINATES
DEGREES DG/100 NORTH/SOUTH EAST/WEST
VERT.
SECT.
12686.86 5349.20 5307.90
12780.46 5369.47 5328.17
12873.02 5389.99 5348.69
12966.72 5410.97 5369.67
13058.82 5432.01 5390.71
77
77
77
76
76
45
13
9
58
37
N 30.15 E .65 8674.18N 5235
N 30.10 E .56 8753.22N 5281
N 29.79 E .34 8831.42N 5326
N 29.18 E .66 8910.91N 5371
N 28.99 E .43 8989.27N 5414
.22E 10126.40
.09E 10217.77
.15E 10308.02
.10E 10399.34
.69E 10489.00
13152.50 5453.80 5412.50 76 29
13246.53 5475.55 5434.25 76 45
13340.37 5497.41 5456.11 76 19
13432.37 5519.38 5478.08 76 2
13525.56 5541.78 5500.48 76 9
N 29.56 E .61 9068.74N 5459.25E
N 29.41 E .32 9148.37N 5504.27E
N 28.70 E .87 9228.14N 5548.59E
N 28.31 E .51 9306.65N 5591.22E
N 28.94 E .66 9386.05N 5634.56E
10580.11
10671.59
10762.85
10852.18
10942.63
13619.04 5564.44 5523.14
13712.92 5587.06 5545.76
13806.51 5609.29 5567.99
13899.53 5631.68 5590.38
13993.83 5654.07 5612.77
75 47
76 19
76 11
75 56
76 34
N 28.65 E .49 9465.53N 5678
N 28.00 E .87 9545.73N 5721
N 28.98 E 1.02 9625.63N 5764
N 28.78 E .34 9704.68N 5808
N 29.18 E .78 9784.81N 5852
.24E 11033.32
.47E 11124.41
.84E 11215.31
.45E 11305.60
.83E 11397.20
14087.36 5676.17 5634.87 76 5
14181.53 5698.16 5656.86 76 53
14275.88 5719.86 5678.56 76 31
14369.17 5740.87 5699.57 77 26
14462.29 5761.65 5720.35 76 46
N 28.73 E .69 9864.33N 5896
N 29.41 E 1.09 9944.36N 5941
N 29.03 E .55 10024.49N 5986
N 29.80 E 1.27 10103.66N 6030
N 29.34 E .86 10182.61N 6075
.83E 11488.08
.32E 11579.64
.1SE 11671.46
.79E 11762.34
.58E 11853.11
14555.13 5783.19 5741.89
14647.88 5804.41 5763.11
14742.67 5825.68 5784.38
14836.01 5847.07 5805.77
14930.67 5868.25 5826.95
76
77
76
76
77
23
9
55
34
33
N 28.92 E .60 10261.49N 6119
N 29.63 E 1.10 10340.24N 6163
N 29.71 E .26 10420.50N 6209
N 29.26 E .59 10499.59N 6254
N 29.50 E 1.06 10579.98N 6299
.55E 11943.42
.70E 12033.70
.43E 12126.07
.14E 12216.93
.40E 12309.18
15023.85 5888.37 5847.07 77 30
15117.01 5908.85 5867.55 77 6
15211.09 5930.19 5888.89 76 40
15304.11 5951.27 5909.97 77 7
15396.65 5971.88 5930.58 77 7
N 29.13 E .38 10659.31N 6343
N 28.67 E .64 10738.87N 6387
N 28.26 E .63 10819.42N 6431
N 28.77 E .72 10899.03N 6474
N 28.44 E .35 10978.24N 6517
.95E 12400.16
.87E 12491.04
.55E 12582.66
.80E 12673.25
.99E 12763.46
15489.99 5992.53 5951.23
15583.07 6013.23 5971.93
15677.07 6034.11 5992.81
15771.48 6054.91 6013.61
15864.46 6075.55 6034.25
77 18
76 59
77 20
77 12
77 8
N 29.28 E .90 11057.96N 6561.92E
N 29.25 E .35 11137.13N 6606.27E
N 30.33 E 1.18 11216.66N 6651.81E
N 29.91 E .45 11296.32N 6698.02E
N 29.43 E .51 11375.09N 6742.90E
12854 .48
12945.23
13036.88
13128.96
13219.61
SPE
f-SUN DRILLING SERVICES
ANCHORAGE ALASKA
PAGE
BP EXPLORATION
MILNE POINT / MPF-41
500292277000
NORTH SLOPE BOROUGH
COMPUTATION DATE: 6/11/97
DATE OF SURVEY: 060597
MAGNETIC MULTI-SHOT SURVEY
JOB NUMBER: AK-EI-70162
KELLY BUSHING ELEV. = 41.30
OPERATOR: BP EXPLORATION
FT.
TRUE SUB-SEA
MEASD VERTICAL VERTICAL
DEPTH DEPTH DEPTH
COURS
INCLN
DG MN
COURSE DLS TOTAL
DIRECTION RECTANGULAR COORDINATES
DEGREES DG/100 NORTH/SOUTH EAST/WEST
VERT.
SECT.
15960.06 6097.06 6055.76
16055.63 6119.00 6077.70
16151.21 6141.06 6099.76
16246.89 6163.32 6122.02
16342.27 6185.62 6144.32
76 50 N 29.38 E .31 11456.23N 6788.64E
76 35 N 29.34 E .27 11537.30N 6834.24E
76 43 N 29.66 E .35 11618.25N 6880.04E
76 22 N 29.23 E .57 11699.28N 6925.78E
76 35 N 30.16 E .98 11779.83N 6971.72E
13312.76
13405.78
13498.78
13591.83
13684.56
16437.57 6207.78 6166.48
16533.14 6230.21 6188.91
16629.02 6252.09 6210.79
16724.87 6273.71 6232.41
16820.32 6294.92 6253.62
76 31 N 29.45 E .73 11860.26N 7017.79E
76 19 N 29.35 E .22 11941.19N 7063.40E
77 17 N 29.55 E 1.02 12022.48N 7109.30E
76 37 N 29.79 E .73 12103.61N 7155.52E
77 41 N 29.75 E 1.12 12184.39N 7201.72E
13777.24
13870.14
13963.49
14056.86
14149.92
16915.73 6315.66 6274.36
17011.37 6336.87 6295.57
17107.26 6358.14 6316.84
17202.77 6379.37 6338.07
17298.44 6400.93 6359.63
77 11 N 29.73 E .54 12265.26N 7247.92E
77 10 N 29.37 E .36 12346.38N 7293.91E
77 11 N 29.18 E .20 12427.94N 7339.64E
77 7 N 28.62 E .57 12509.46N 7384.64E
76 49 N 28.12 E .60 12591.48N 7428.93E
14243.05
14336.30
14429.80
14522.92
14616.12
17394.07 6422.81 6381.51
17489.63 6444.57 6403.27
17585.26 6467.42 6426.12
17680.87 6492.87 6451.57
17776.37 6521.22 6479.92
76 43 N 27.90 E .25 12673.67N 7472.64E
76 56 N 28.36 E .53 12755.72N 7516.51E
75 24 N 28.60 E 1.63 12837.34N 7560.79E
73 41 N 28.45 E 1.79 12918.30N 7604.79E
71 45 N 28.64 E 2.04 12998.40N 7648.36E
14709.19
14802.22
14895.06
14987.20
15078.37
17872.01 6552.92 6511.62
17967.60 6588.19 6546.89
18063.32 6627.39 6586.09
18158.85 6670.65 6629.35
18254.65 6718.17 6676.87
69 31 N 29.89 E 2.65 13077.10N 7692.45E
67 10 N 30.19 E 2.48 13154.00N 7736.91E
64 28 N 30.74 E 2.87 13229.26N 7781.17E
61 40 N 30.98 E 2.93 13302.37N 7824.85E
58 49 N 31.18 E 2.98 13373.61N 7867.78E
15168.58
15257.40
15344.69
15429.83
15512.95
18350.50 6770.12 6728.82
18445.88 6826.47 6785.17
18541.51 6887.56 6846.26
18637.01 6952.99 6911.69
18732.76 7022.43 6981.13
55 31 N 30.29 E 3.53 13442.83N 7908.95E
52 1 N 30.08 E 3.68 13509.33N 7947.64E
48 33 N 29.27 E 3.68 13573.22N 7984.07E
44 55 N 28.03 E 3.92 13634.24N 8017.43E
42 5 N 28.95 E 3.03 13692.18N 8048.86E
15593.47
15670.39
15743.94
15813.48
15879.39
18811.00 7081.34 7040.04
18923.16 7167.95 7126.65
19018.61 7242.73 7201.43
19114.02 7318.11 7276.81
19209.47 7394.23 7352.93
40 11 N 28.57 E 2.46 13737.30N 8073.63E
38 41 N 27.77 E 1.41 13800.10N 8107.27E
38 9 N 27.40 E .60 13852.67N 8134.74E
37 26 N 27.00 E .80 13904.68N 8161.47E
36 47 N 25.75 E 1.04 13956.28N 8187.06E
15930.86
16002.09
16061.38
16119.82
16177.34
SPE
f-SUN DRILLING SERVICES
ANCHOR_AGE ALASKA
PAGE
BP EXPLORATION
MILNE POINT / MPF-41
500292277000
NORTH SLOPE BOROUGH
COMPUTATION DATE: 6/11/97
DATE OF SURVEY: 060597
MAGNETIC MULTI-SHOT SURVEY
JOB NUMBER: AK-EI-70162
KELLY BUSHING ELEV. = 41.30 FT.
OPERATOR: BP EXPLORATION
TRUE SUB-SEA
MEASD VERTICAL VERTICAL
DEPTH DEPTH DEPTH
COURS COURSE DLS TOTAL
INCLN DIRECTION RECTANGULAR COORDINATES VERT.
DG MN DEGREES DG/100 NORTH/SOUTH EAST/WEST SECT.
19305.29 7471.15 7429.85 36 24 N 25.12 E .55 14007.87N 8211.59E 16234.34
19400.67 7548.13 7506.83 35 58 N 25.08 E .46 14058.87N 8235.49E 16290.51
19495.87 7625.04 7583.74 36 15 N 26.30 E .81 14109.42N 8259.81E 16346.50
19591.11 7701.76 7660.46 36 25 N 27.99 E 1.06 14159.64N 8285.56E 16402.89
19686.56 7778.61 7737.31 36 19 N 27.86 E .14 14209.66N 8312.07E 16459.48
19741.56 7822.91 7781.61 36 21 N 27.56 E .33 14238.51N 8327.22E 16492.06
THE CALCULATION PROCEDURES ARE BASED ON THE USE OF
THREE-DIMENSION MINIMUM CURVATURE METHOD.
HORIZONTAL DISPLACEMENT = 16494.78 FEET
AT NORTH 30 DEG. 19 MIN. EAST AT MD = 19741
VERTICAL SECTION RELATIVE TO WELL HEAD
VERTICAL SECTION COMPUTED ALONG 29.28 DEG.
TIE-IN SURVEY AT 9,332.83' MD
LAST SURVEY STATION AT 19,741.56' MD
SP~
JY-SUN DRILLING SERVICES
ANCHOR3AGE ALASKA
PAGE
BP EXPLORATION
MILNE POINT / MPF-41
500292277000
NORTH SLOPE BOROUGH
COMPUTATION DATE: 6/11/97
INTERPOLATED VALUES FOR EVEN 1000
DATE OF SURVEY: 060597
JOB NUMBER: AK-EI-70162
KELLY BUSHING ELEV. = 41.30 FT.
OPERATOR: BP EXPLORATION
FEET OF MEASURED DEPTH
TRUE SUB-SEA TOTAL
MEASD VERTICAL VERTICAL RECTANGULAR COORDINATES MD-TVD
DEPTH DEPTH DEPTH NORTH/SOUTH EAST/WEST DIFFERENCE
9332.83 4619.84 4578.54 5822.81 N 3628.18 E 4712.99
10332.83 4832.50 4791.20 6677.13 N 4101.70 E 5500.33
11332.83 5041.33 5000.03 7527.42 N 4584.71 E 6291.50
12332.83 5270.57 5229.27 8373.26 N 5066.18 E 7062.26
13332.83 5495.62 5454.32 9221.72 N 5545.07 E 7837.21
VERTICAL
CORRECTION
787.34
791.16
770.77
774.95
14332.83 5732.97 5691.67 10072.88 N 6013.16 E 8599.86
15332.83 5957.67 5916.37 1,0923.57 N 6488.27 E 9375.16
16332.83 6183.43 6142.13 11771.90 N 6967.11 E 10149.40
17332.83 6408.77 6367.47 12621.01 N 7444.71 E 10924.06
18332.83 6760.19 6718.89 13430.21 N 7901.56 E 11572.64
762.65
775.31
774.24
774.66
648.57
19332.83 7493.32 7452.02 14022.67 N 8218.53 E 11839.51
19741.56 7822.91 7781.61 14238.51 N 8327.22 E 11918.65
266.88
79.13
THE CALCULATION PROCEDURES ARE BASED ON THE USE OF
THREE-DIMENSION MINIMUM CURVATURE METHOD.
SP~
Y-SUN DRILLING SERVICES
ANCHORAGE ALASKA
PAGE
BP EXPLORATION
MILNE POINT / MPF-41
500292277000
NORTH SLOPE BOROUGH
COMPUTATION DATE: 6/11/97
DATE OF SURVEY: 060597
JOB NUMBER: AK-EI-70162
KELLY BUSHING ELEV. = 41.30 FT.
OPERATOR: BP EXPLORATION
INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH
TRUE SUB-SEA
MEASD VERTICAL VERTICAL
DEPTH DEPTH DEPTH
TOTAL
RECTANGULAR COORDINATES
NORTH/SOUTH EAST/WEST
MD-TVD VERTICAL
DIFFERENCE CORRECTION
9332.83 4619.84 4578.54 5822.81 N 3628.18 E 4712.99
9437.89 4641.30 4600.00 5910.64 N 3681.70 E 4796.59 83.60
9893.94 4741.30 4700.00 6297.65 N 3901.03 E 5152.64 356.05
10377.18 4841.30 4800.00 6715.13 N 4122.81 E 5535.88 383.24
10862.89 4941.30 4900.00 7128.80 N 4356.83 E 5921.59 385.71
11332.66 5041.30 5000.00 7527.28 N 4584.63 E 6291.37 369.77
11767.55 5141.30 5100.00 7894.72 N 4794.48 E 6626.25 334.88
12204.59 5241.30 5200.00 8264.65 N 5004.61 E 6963.29 337.05
12649.66 5341.30 5300.00 8642.74 N 5216.97 E 7308.36 345.07
13098.93 5441.30 5400.00 9023.38 N 5433.62 E 7657.63 349.27
13523.57 5541.30 5500.00 9384.36 N 5633.63 E 7982.27 324.64
13939.26 5641.30 5600.00 9738.46 N 5827.02 E 8297.96 315.69
14371.13 5741.30 5700.00 10105.32 N 6031.74 E 8629.83 331.87
14811.14 5841.30 5800.00 10478.48 N 6242.32 E 8969.84 340.01
15259.47 5941.30 5900.00 10860.88 N 6453.88 E 9318.17 348.33
15709.88 6041.30 6000.00 11244.29 N 6667.97 E 9668.58 350.41
16152.27 6141.30 6100.00 11619.15 N 6880.55 E 10010.97 342.39
16580.38 6241.30 6200.00 11981.21 N 7085.92 E 10339.08 328.11
17031.34 6341.30 6300.00 12363.36 N 7303.47 E 10690.04 350.97
17475.13 6441.30 6400.00 12743.29 N 7509.80 E 11033.83 343.79
17838.79 6541.30 6500.00 13050.13 N 7676.94 E 11297.50 263.67
18095.03 6641.30 6600.00 13253.75 N 7795.75 E 11453.73 156.24
18298.35 6741.30 6700.00 13405.40 N 7886.86 E 11557.05 103.32
18469.72 6841.30 6800.00 13525.50 N 7956.96 E 11628.42 71.37
18620.37 6941.30 6900.00 13623.80 N 8011.84 E 11679.07 50.65
1875'8.19 7041.30 7000.00 13707.09 N 8057.11 E 11716.89 37.82
18889.02 7141.30 7100.00 13781.21 N 8097.33 E 11747.72 30.83
19016.79 7241.30 7200.00 13851.68 N 8134.23 E 11775.49 27.78
19143.22 7341.30 7300.00 13920.50 N 8169.53 E 11801.92 26.43
19268.19 7441.30 7400.00 13987.93 N 8202.24 E 11826.89 24.97
19392.23 7541.30 7500.00 14054.38 N 8233.39 E 11850.93 24.04
19516.03 7641.30 7600.00 14120.12 N 8265.09 E 11874.73 23.80
19640.25 7741.30 7700.00 14185.40 N 8299.24 E 11898.95 24.22
19741.56 7822.92 7781.62 14238.51 N 8327.22 E 11918.65 19.70
THE CALCULATION PROCEDURES USE A LINEAR INTERPOLATION BETWEEN
THE NEAREST 20 FOOT MD (FROM MINIMUM CURVATURE) POINTS
B.P. EXPLORATION
F PAD, WELL NO. MPF-41
MILNE POINT FIELD, ALASKA
Gyro Multishot Survey Inside 7" CASING
Survey date: 21 - JUNE, 1997
Job number :A0697GCE408
CONTENTS
JOB NUMBER :A0697GCE408
1. DISCUSSION , SURVEY CERTIFICATION SHEET
2. SURVEY DETAILS
3. OUTRUN SURVEY LISTING
4. QUALITY CONTROL
5. EQUIPMENT AND CHRONOLOGICAL REPORT
1. DISCUSSION , SURVEY CERTIFICATION SHEET
DISCUSSION
JOB NUMBER' A0697GCE408
Tool 778 was run in WELL# MPF-41 on SCHLUMBERGER 318" wireline inside CASING.
We were unable to get to bottom on the first try. After adding a weight bar we were able to
get down. Otherwise the survey was run without problems.
SURVEY CERTIFICATION SHEET
JOB NUMBER- A0697GCE408
The data for this survey and the calculations for this survey were obtained and performed by me
according to standards and procedures as set forth by Gyrodata Limited, true and correct to the best of
my knowledge.
TOM STODDARD
OPERATIONS ENGINEER
The data and calculations for this survey have been checked by me and conform to the standards and
procedures as set forth by Gyrodata Limited.
This report represents a directional survey of this well based on the odginal data obtained at the
wellsite.
Checked by :-
ROB SHOUP
OPERATIONS MANAGER
2. SURVEY DETAILS
SURVEY DETAILS,
JOB NUMBER: A0697GCE408
CLIENT: B.P. EXPLORATION
RIG:
SCHLUMBERGER
LOCATION: F PAD
WELL: MPF-41
LATITUDE: 70.505 N
LONGITUDE: 149.63 W
SURVEY DATE: 21-JUNE-97
SURVEY TYPE : GYRO MULTISHOT IN 7" CASING
DEPTH REFERENCE:
41.3'
MAX. SURVEY DEPTH:
ROTARY TABLE ELEVATION
19700'
SURVEY TIED ONTO: NA
SURVEY INTERVAL:
0-19700'
APl NUMBER: 050-029-22778
TARGET DIRECTION: 29.28
GRID CORRECTION: N/A
CALCULATION METHOD: MINIMUM CURVATURE
SURVEYOR: TOM STODDARD
3. OUTRUN SURVEY LISTING
A Gyrodat a D i re c t i ona i Survey
for
B.P. EXPLORATION
F PAD, WELL NO. MPF-41
MILNE POINT FIELD, ALASKA
Job Number: A0697GCE408
Run Date: 21-Jun-97 12:00:00
Surveyor: TOM STODDARD
Calculation Method: MINIMUM CURVATURE
Survey Latitude: 70.505000 deg. N
Sub-sea Correction from Vertical Reference: 41.3 ft.
Azimuth Correction:
Gyro: Bearings are Relative to True North
Proposed Well Direction: 29.280 deg
Vertical Section Calculated from Well Head Location
Closure Calculated from Well Head Location
Horizontal Coordinates Calculated from Local Horizontal Reference
B.P. EXPLORATION
F PAD, WELL NO. MPF-41
MILNE POINT FIELD, ALASKA
Job Number: A0697GCE408
A Gy r o d a t a D i
r e c t i o n a
1 Survey
Page
MEASURED I N C L AZIMUTH VERTICAL
DEPTH DEPTH
feet deg. deg. feet
VERTICAL
SECTION
feet
DOGLEG CLOSURE
SEVERITY DIST. AZIMUTH
deg./ feet deg.
100 ft.
HORIZONTAL
COORDINATES
feet
0.0 0.00 0.00 0.0
100.0 .25 252.23 100.0
200.0 .08 36.16 200.0
302.0 1.17 64.64 302.0
401.0 2.36 71.52 400.9
0.0
.7
3.0
0.00 0.0 0.0
.25 .2 252.2
.32 .4 258.8
1.08 .8 55.0
1.22 3.8 66.4
0.00 N 0.00 E
.07 S .21 W
.07 S .37 W
.43 N .62 E
1.51 N 3.47 E
501.0 3.49 72.77 500.8
601.0 4.10 71.01 600.6
700.0 5.79 73.13 699.2
800.0 7.01 73.59 798.6
902.0 8.03 71.82 899.7
6
11
17
25
35
.8
.6
.9
.9
.6
1.13 8.9 69.8
.62 15.5 70.6
1.72 24.0 71.2
1.22 35.2 71.9
1.02 48.5 72.1
3.07 N 8.33 E
5.13 N 14.61 E
7.73 N 22.74 E
10.92 N 33.42 E
14.90 N 46.16 E
1000.0 10.57 68.64 996.4
1101.0 12.31 67.46 1095.4
1200.0 14.07 67.22 1191.8
1250.0 14.74 65.94 1240.2
1300.0 15.30 64.29 1288.5
47
63
81
90
101
.6
.2
.0
.9
.4
2.65 64.3 71.6
1.74 84.3 70.7
1.77 106.9 70.0
1.49 119.3 69.7
1.41 132.2 69.2
20.31 N 61.04 E
27.82 N 79.62 E
36.52 N 100.46 E
41.47 N 111.87 E
46.92 N 123.62 E
1350.0 16.01 61.90 1336.7
1400.0 17.42 58.80 1384.5
1450.0 18.64 56.40 1432.1
1500.0 19.59 52.71 1479.3
1550.0 19.56 50.25 1526.4
112
124
138
153
168
.6
.9
.5
.3
.9
1.93 145.6 68.6
3.32 159.9 67.9
2.85 175.1 67.0
3.08 191.1 65.9
1.64 207.4 64.8
53.03 N 135.65 E
60.16 N 148.13 E
68.46 N 161.19 E
77.96 N 174.51 E
88.39 N 187.61 E
1600.0 19.49 49.62 1573.6
1650.0 19.92 49.37 1620.6
1700.0 21.13 49.77 1667.5
1750.0 22.21 50.02 1713.9
1800.0 23.83 50.54 1760.0
184.5
200.3
216.8
234.0
252.3
.45 223.6 63.7
.87 240.0 62.7
2.44 257.1 61.8
2.16 275.2 61.0
3.28 294.4 60.3
99.14 N 200.40 E
110.09 N 213.22 E
121.46 N 226.57 E
133.35 N 240.69 E
145.84 N 255.73 E
B.P. EXPLORATION
F PAD, WELL NO. MPF-4I
MILNE POINT FIELD, ALASKA
Job Number: A0697GCE408
A Gy r o d a t a
D i re c't i ona 1
Survey
Page
MEASURED I N C L AZIMUTH VERTICAL
DEPTH DEPTH
feet deg. deg. feet
VERTICAL
SECTION
feet
DOGLEG CLOSURE
SEVERITY DIST. AZIMUTH
deg./ feet deg.
100 ft.
HORIZONTAL
COORDINATES
feet
1850.0 24.58 50.68 1805.6
1900.0 25.43 50.91 1850.9
1950.0 26.30 50.59 1895.9
2000.0 27.71 50.01 1940.4
2050.0 28.57 50.04 1984.5
271.4
291.0
311.3
332.5
354.6
1.50 314.6 59.7
1.70 335.5 59.1
1.76 357.1 58.6
2.88 379.6 58.1
1.72 402.9 57.6
158.85 N
172.21 N
186.01 N
200.51 N
215.66 N
271.58 E
287.95 E
304.84 E
322.31 E
340.38 E
2100.0 30.03 50.12 2028.1
2150.0 31.42 49.86 2071.1
2200.0 32.74 49.71 2113.4
2250 . 0 33 . 65 49 . 18 2155 . 3
2300.0 34.68 47.96 2196.7
377.5
401.3
426.2
451.9
478.4
2.92 427.2 57.2
2.79 452.6 56.8
2.65 478.9 56.4
1.91 506.1 56.0
2.47 534.0 55.6
231.36 N
247.79 N
264.93 N
282.73 N
301.31 N
359.15 E
378.71 E
398.99 E
419.79 E
440.83 E
2350.0 34.68 44.86 2237.8
2400.0 34.64 42.98 2278.9
2450.0 34.68 40.45 2320.0
2500.0 35.06 38.33 2361.1
2550.0 35.51 36.59 2401.9
505.6
533.1
560.9
589.0
617.6
3.52 562.1 55.2
2.14 590.0 54.6
2.88 617.7 54.1
2.54 645.4 53.4
2.20 673.2 52.7
320.92 N
341.40 N
362.62 N
384.71 N
407.64 N
461.43 E
481.16 E
500.07 E
518.21 E
535.77 E
2600.0 35.66 35.40 2442.5
2650.0 35.56 32.69 2483.2
2700.0 35.61 32.31 2523.9
2750.0 35.36 32.30 2564.6
2800.0 35.99 31.94 2605.2
646.5
675.5
704.5
733.5
762.7
1.41 701.1 52.0
3.17 728.9 51.3
.45 756.5 50.6
.50 784.1 50.0
1.32 811.9 49.3
431.18 N
455.29 N
479.83 N
504.37 N
529.07 N
552.87 E
569.17 E
584.80 E
600.31 E
615.81 E
2850.0 37.74 31.07 2645.2
2900.0 38.66 30.81 2684.5
2950.0 39.76 30.81 2723.2
3000.0 40.69 30.69 2761.4
3050.0 41.90 30.72 2799.0
792.6
823.5
855.1
887.4
920.4
3.65 840.5 48.7
1.87 870.0 48.1
2.18 900.2 47.5
1.88 931.2 46.9
2.41 962.9 46.4
554.64 N
581.16 N
608.31 N
636.06 N
664.43 N
631.49 E
647.38 E
663.57 E
680.08 E
696.93 E
A Gyr oda t a D i re c t i ona i Survey
B.P. EXPLORATION
F PAD, WELL NO. MPF-41
MILNE POINT FIELD, ALASKA
Job Number: A0697GCE408
Page
MEASURED
DEPTH
feet
I N C L AZIMUTH VERTICAL
DEPTH
deg. deg. feet
VERTICAL
SECTION
feet
DOGLEG CLOSURE
SEVERITY DIST. AZIMUTH
deg./ feet deg.
100 ft.
HORIZONTAL
COORDINATES
feet
3100.0
3150.0
3200.0
3250.0
3300.0
42.85 30.89 2835.9
44.11 31.45 2872.2
45.10 31.61 2907.8
46.09 31.57 2942.8
47.34 30.94 2977.0
954.1
988.5
1023.5
1059.2
1095.6
1.93 995.4 45.8
2.62 1028.7 45.4
2.00 1062.8 44.9
1.97 1097.6 44.5
2.66 1133.1 44.1
693.37 N 714.19 E
722.81 N 732.00 E
752.73 N 750.36 E
783.16 N 769.07 E
814.27 N 787.95 E
3350
3400
3450
3500
3550
.0
.0
.0
.0
.0
48.46 30.80 3010.6
49.67 31.18 3043.3
50.54 31.73 3075.4
52.08 31.92 3106.6
52.40 31.56 3137.3
1132
1170
1208
1247
1287
.7
.5
.8
.8
.3
2.26 1169.2 43.6
2.48 1206.1 43.3
1.93 1243.7 42.9
3.11 1282.0 42.6
.85 1320.9 42.2
846.12 N 806.99 E
878.50 N 826.44 E
911.22 N 846.45 E
944.38 N 867.03 E
978.00 N 887.83 E
3600
3650
3700
3750
3800
3850
3900
3950
4000
4050
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
53.57 31.26 3167.4
54.60 30.84 3196.7
56.09 30.47 3225.1
56.73 30.17 3252.8
58.11 29.79 3279.7
58.95 29.37 3305.8
60.15 29.00 3331.1
61.40 28.80 3355.6
62.80 28.64 3379.0
63.81 28.36 3401.4
1327
1367
1408
1450
1492
1535
1578
1621
1666
1710
.2
.6
.8
.4
.5
.2
.3
.9
.1
.8
2.38 1360.1 41.9
2 . 18 1399 . 9 41 . 6
3.03 1440.3 41.3
1.38 1481.2 41.0
2.85 1522.6 40.7
1.82 1564.5 40.4
2.47 1606.8 40.1
2.53 1649.6 39.8
2.82 1693.0 39.5
2.07 1736.8 39.2
1012.07 N
1046.77 N
1082.15 N
1118.10 N
1154.60 N
1191.69 N
1229.32 N
1267.52 N
1306.27 N
1345.52 N
908.63 E
929.52 E
950.49 E
971.51 E
992.56 E
1013.61 E
1034.63 E
1055.72 E'
1076.95 E
1098.27 E
4100.0
4150.0
4200.0
4250.0
4300.0
64.89 28.32 3423.1
66.20 28.33 3443.8
67.40 28.36 3463.5
68.77 28.49 3482.1
70.52 28.83 3499.5
1755.8
1801.3
1847.3
1893.7
1940.5
2.18 1781.1 38.9
2.61 1825.9 38.7
2.39 1871.1 38.4
2.76 1916.8 38.2
3.54 1963.0 38.0
1385.19 N
1425.26 N
1465.70 N
1506.50 N
1547.63 N
1119.66 E
1141.26 E
1163.08 E
1185.16 E
1207.64 E
A Gyroda t a D i r e c t i ona i Survey
B.P. EXPLORATION
F PAD, WELL NO. MPF-41
MILNE POINT FIELD, ALASKA
Job Number: A0697GCE408
Page
MEASURED
DEPTH
feet
I N C L AZIMUTH VERTICAL
DEPTH
deg. deg. feet
VERTICAL DOGLEG CLOSURE
SECTION SEVERITY DIST. AZIMUTH
feet deg./ feet deg.
100 ft.
HORIZONTAL
COORDINATES
feet
4350.0
4400.0
4450.0
4500.0
4550.0
72.22 28.98 3515.5
73.05 29.21 3530.4
74.92 29.44 3544.2
75.91 29.78 3556.8
77.22 29.69 3568.4
1987.9 3.42 2009.8 37.8
2035.6 1.73 2057.0 37.6
2083.7 3.75 2104.6 37.4
2132.1 2.10 2152.6 37.2
2180.7 2.62 2200.8 37.0
1589.10 N
1630.81 N
1672.71 N
1714.78 N
1757.01 N
1230.54 E
1253.74 E
1277.28 E
1301.19 E
1325.30 E
4600
4650
4700
4750
4800
.0
.0
.0
.0
.0
77.55 29.37 3579.3
77.55 29.23 3590.1
77.54 29.03 3600.9
77.25 28.92 3611.8
77.16 28.78 3622.9
2229.5 .90 2249.2 36.9
2278.3 .27 2297.6 36.7
2327.1 .39 2346.0 36.5
2375.9 .62 2394.4 36.4
2424.7 .32 2442.7 36.2
1799.46 N
1842.04 N
1884.69 N
1927.37 N
1970.08 N
1349.35 E
1373.24 E
1397.01 E
1420.65 E
1444.17 E
4850
4900
4950
5000
5050
.0
.0
.0
.0
.0
77.14 28.85 3634.0
76.84 30.03 3645.2
77.04 30.18 3656.5
77.61 30.78 3667.5
77.88 30.90 3678.1
2473.4 .14 2491.1 36.1
2522.2 2.38 2539.5 36.0
2570.9 .50 2587.9 35.9
2619.6 1.64 2636.5 35.8
2668.5 .58 2685.2 35.7
2012.79 N
2055.22 N
2097.35 N
2139.39 N
2181.34 N
1467.67 E
1491.61 E
1516.05 E
1540.79 E
1565.84 E
5100
5150
5200
5250
5300
.0
.0
.0
.0
.0
78.23 30.70 3688.5
78.33 30.53 3698.6
78.41 30.35 3708.7
78.24 30.27 3718.8
78.33 30.15 3729.0
2717.4 .80 2733.9 35.6
2766.3 .39 2782.7 35.5
2815.3 .37 2831.5 35.4
2864.2 .37 2880.2 35.3
2913.2 .29 2929.0 35.2
2223.36 N
2265.49 N
2307.72 N
2349.99 N
2392.29 N
1590.89 E
1615.82 E
1640.64 E
1665.35 E
1689.99 E
5350.0
5400.0
5450.0
5500.0
5550.0
78.02 30.04 3739.2
77.40 29.70 3749.9
77.51 29.46 3760.7
77.19 28.91 3771.7
77.31 28.80 3782.7
2962.1 .65 2977.8 35.2
3011.0 1.40 3026.4 35.1
3059.8 .52 3075.0 35.0
3108.6 1.24 3123.5 34.9
3157.3 .32 3172.0 34.8
2434.63 N
2477.00 N
2519.44 N
2562.04 N
2604.75 N
1714.53 E
1738.86 E
1762.95 E
1786.74 E
1810.27 E
A Gyr oda t a D i r e c t i ona i Survey
B.P. EXPLORATION
F PAD, WELL NO. MPF-41
MILNE POINT FIELD, ALASKA
Job Number: A0697GCE408
Page
MEASURED
DEPTH
feet
I N C L AZIMUTH VERTICAL
DEPTH
deg. deg. feet
VERTICAL DOGLEG CLOSURE
SECTION SEVERITY DIST. AZIMUTH
feet deg./ feet deg.
100 ft.
H O R I Z O N T A L
COORDINATES
feet
5600.0
5650.0
5700.0
5750.0
5800.0
77.52 28.84 3793.6
77.59 28.75 3804.4
77.40 28.50 3815.2
77.21 28.46 3826.2
77.61 28.13 3837.1
3206.1 .43 3220.6 34.7
3255.0 .23 3269.1 34.6
3303.8 .61 3317.7 34.5
3352.5 .38 3366.2 34.4
3401.3 1.03 3414.7 34.4
2647.50 N
2690.29 N
2733.14 N
2776.01 N
2818.98 N
1833.80 E
1857.32 E
1880.70 E
1903.96 E
1927.09 E
5850
5900
5950
6000
6050
.0
.0
.0
.0
.0
77.65 27.95 3847.8
77.80 28.01 3858.4
77.57 28.78 3869.1
77.68 28.94 3879.8
78.28 28.99 3890.2
3450.2 .36 3463.3 34.3
3499.0 .32 3511.8 34.2
3547.8 1.57 3560.4 34.1
3596.7 .38 3609.1 34.0
3645.6 1.20 3657.8 34.0
2862.09 N
2905.23 N
2948.21 N
2990.98 N
3033.77 N
1950.05 E
1972.97 E
1996.20 E
2019.77 E
2043.45 E
6100
6150
6200
6250
6300
.0
.0
.0
.0
.0
78.43 29.31 3900.3
77.98 30.04 3910.5
77.33 29.89 3921.2
76.15 29.66 3932.7
76.76 29.84 3944.4
3694.6 .69 3706.6 33.9
3743.5 1.68 3755.4 33.8
3792.3 1.34 3804.1 33.8
3841.0 2.40 3852.7 33.7
3889.6 1.27 3901.2 33.7
3076.54 N
3119.06 N
3161.38 N
3203.62 N
3245.82 N
2067.30 E
2091.53 E
2115.93 E
2140.10 E
2164.22 E
6350
6400
6450
6500
6550
.0
.0
.0
.0
.0
76.97 29.96 3955.8
77.57 30.22 3966.8
77.82 30.03 3977.5
76.81 30.37 3988.4
76.36 30.60 4000.0
3938.3 .48 3949.8 33.6
3987.1 1.31 3998.4 33.6
4035.9 .63 4047.2 33.6
4084 . 7 2 . 14 4095 . 9 33 . 5
4133 . 3 . 99 4144 . 5 33 . 5
3288.03 N
3330.23 N
3372.48 N
3414.64 N
3456.55 N
2188.49 E
2212.94 E
2237.46 E
2262.00 E
2286.67 E
6600.0
6650.0
6700.0
6750.0
6800.0
76.47 30.55 4011.8
76.44 30.80 4023.5
76.52 30.84 4035.2
76.42 30.79 4046.9
76.20 30.67 4058.7
4181.9 .23 4193.0 33.5
4230.5 .48 4241.6 33.4
4279.1 .20 4290.1 33.4
4327.7 .22 4338.7 33.4
4376.2 .50 4387.2 33.3
3498.40 N
3540.20 N
3581.95 N
3623.70 N
3665.46 N
2311.40 E
2336.19 E
2361.10 E
2386.01 E
2410.83 E
A Gyroda t a D i r e c t i ona i Survey
B.P. EXPLORATION
F PAD, WELL NO. MPF-41
MILNE POINT FIELD, ALASKA
Job Number: A0697GCE408
Page
MEASURED
DEPTH
feet
I N C L AZIMUTH VERTICAL
DEPTH
deg. deg. feet
VERTICAL DOGLEG CLOSURE
SECTION SEVERITY DIST. AZIMUTH
feet deg./ feet deg.
100 ft.
HORIZONTAL
COORDINATES
feet
6850.0 76.04 30.62 4070.7
6900.0 75.81 30.39 4082.9
6950.0 76.18 30.17 4095.0
7000.0 76.93 29.88 4106.6
7050.0 76.78 29.81 4117.9
4424.8 .33 4435.7 33.3
4473.3 .64 4484.1 33.3
4521.8 .85 4532.6 33.2
4570.4 1.61 4581.2 33.2
4619.1 .33 4629.8 33.2
3707.22 N 2435.58 E
3749.00 N 2460.20 E
3790.90 N 2484.66 E
3833.00 N 2509.00 E
3875.23 N 2533.23 E
7100.0 76.76 29.64 4129.4
7150.0 76.96 29.59 4140.8
7200.0 77.10 29.79 4152.0
7250.0 77.17 29.63 4163.1
7300.0 77.31 29.65 4174.2
4667.8 .35 4678.3 33.1
4716.4 .42 4726.9 33.1
4765.2 .49 4775.6 33.1
4813.9 .35 4824.2 33.0
4862.7 .29 4872.9 33.0
3917.50 N
3959.83 N
4002.16 N
4044.50 N
4086.88 N
2557.36 E
2581.42 E
2605.56 E
2629.72 E
2653.83 E
7350.0 77.37 29.46 4185.1
7400.0 77.40 29.48 4196.0
7450.0 77.15 29.35 4207.0
7500.0 77.13 29.21 4218.2
7550.0 77.11 29.07 4229.3
4911.5 .40 4921.6 33.0
4960.2 .07 4970.3 32.9
5009.0 .56 5019.0 32.9
5057.8 .27 5067.7 32.9
5106.5 .27 5116.3 32.8
4129.32 N
4171.80 N
4214.28 N
4256.80 N
4299.37 N
2677.90 E
2701.90 E
2725.85 E
2749.69 E
2773.43 E
7600.0 76.80 28.80 4240.6
7650.0 76.31 28.38 4252.2
7700.0 76.19 28.53 4264.1
7750.0 76.20 29.03 4276.0
7800.0 76.65 29.19 4287.8
5155.2 .82 5164.9 32.8
5203.8 1.28 5213.4 32.7
5252.4 .37 5261.8 32.7
5301.0 .98 5310.3 32.7
5349.6 .95 5358.8 32.6
4342.00 N
4384.70 N
4427.40 N
4469.96 N
4512.42 N
2797.00 E
2820.27 E.
2843.41 E
2866.79 E
2890.43 E
7850.0 77.25 29.46 4299.1
7900.0 77.10 29.17 4310.2
7950.0 76.92 28.91 4321.4
8000.0 78.09 29.44 4332.2
8050.0 78.13 29.46 4342.5
5398.3 1.31 5407.4 32.6
5447.0 .65 5456.1 32.6
5495.7 .62 5504.7 32.6
5544.6 2.57 5553.4 32.5
5593.5 .09 5602.3 32.5
4554.89 N
4597.40 N
4639.99 N
4682.61 N
4725.22 N
2914.29 E
2938.16 E
2961.81 E
2985.61 E
3009.66 E
A Gyro da t a D i r e c t i ona i Survey
B.P. EXPLORATION
F PAD, WELL NO. MPF-41
MILNE POINT FIELD, ALASKA
Job Number: A0697GCE408
Page
MEASURED
DEPTH
feet
I N C L AZIMUTH VERTICAL
DEPTH
deg. deg. feet
VERTICAL DOGLEG CLOSURE
SECTION SEVERITY DIST. AZIMUTH
feet deg./ feet deg.
100 ft.
HORIZONTAL
COORDINATES
feet
8100.0
8150.0
8200.0
8250.0
8300.0
77.57 29.21 4353.0
77.38 28.96 4363.9
77.05 28.78 4375.0
76.62 28.64 4386.3
76.23 28.46 4398.1
5642.4 1.22 5651.1 32.5
5691.2 .62 5699.8 32.4
5739.9 .74 5748.5 32.4
5788.6 .91 5797.1 32.4
5837.2 .85 5845.6 32.3
4767.83 N
4810.48 N
4853.19 N
4895.89 N
4938.58 N
3033.61 E
3057.34 E
3080.88 E
3104.27 E
3127.50 E
8350.0
8400.0
8450.0
8500.0
8550.0
76.00 28.47 4410.1
76.19 29.06 4422.1
76.29 28.98 4434.0
76.82 28.82 4445.6
76.46 29.08 4457.2
5885.7 .47 5894.0 32.3
5934.3 1.22 5942.4 32.3
5982.8 .27 5990.9 32.3
6031.5 1.09 6039.5 32.2
6080.1 .89 6088.1 32.2
4981.25 N
5023.79 N
5066.26 N
5108.84 N
5151.40 N
3150.63 E
3173.99 E
3197.55 E
3221.05 E
3244.59 E
8600.0
8650.0
8700.0
8750.0
8800.0
76.55 29.71 4468.8
77.09 29.41 4480.2
77.32 29.27 4491.3
77.28 30.18 4502.3
76.98 30.87 4513.4
6128.7 1.24 6136.6 32.2
6177.4 1.23 6185.2 32.2
6226.2 .55 6233.9 32.1
6275.0 1.78 6282.7 32.1
6323.7 1.46 6331.4 32.1
5193.76 N
5236.11 N
5278.61 N
5320.97 N
5362.96 N
3268.46 E
3292.48 E
3316.37 E
3340.56 E
3365.32 E
8850.0
8900.0
8950.0
9000.0
9050.0
77.35 31.21 4524.5
77.45 31.35 4535.5
77.73 31.45 4546.2
77.56 31.19 4556.9
77.26 30.68 4567.8
6372.4 1.00 6380.1 32.1
6421.2 .35 6428.9 32.1
6470.0 .59 6477.8 32.1
6518.8 .61 6526.6 32.1
6567.6 1.16 6575.4 32.1
5404.73 N
5446.43 N
5488.11 N
5529.83 N
5571.69 N
3390.45 E
3415.79 E
3441.23 E
3466.62 E
3491.71 E
9100.0
9150.0
9200.0
9250.0
9300.0
77.08 30.84 4578.9
77.08 31.27 4590.1
77.34 31.12 4601.2
78.36 30.86 4611.7
78.06 31.34 4621.9
6616.3 .49 6624.1 32.1
6665.0 .83 6672.9 32.1
6713.7 .59 6721.6 32.1
6762.6 2.11 6770.5 32.0
6811.5 1.11 6819.4 32.0
5613.58 N
5655.33 N
5697.04 N
5738.94 N
5780.85 N
3516.64 E
3541.78 E
3567.04 E
3592.20 E
3617.49 E
A Gyrodat a Di re c t i ona i Survey
B.P. EXPLORATION
F PAD, WELL NO. MPF-41
MILNE POINT FIELD, ALASKA
Job Number: A0697GCE408
Page
MEASURED
DEPTH
feet
I N C L AZIMUTH VERTICAL
DEPTH
deg. deg. feet
VERTICAL DOGLEG CLOSURE
SECTION SEVERITY DIST. AZIMUTH
feet deg./ feet deg.
100 ft.
HORIZONTAL
COORDINATES
feet
9350.0
9400.0
9450.0
9500.0
9550.0
78.42 31.16 4632.1
77.99 30.75 4642.3
77.74 30.38 4652.8
77.50 29.95 4663.5
77.14 29.65 4674.5
6860.4 .81 6868.4 32.0
6909.4 1.18 6917.3 32.0
6958.2 .88 6966.2 32.0
7007.1 .97 7015.0 32.0
7055.8 .92 7063.7 32.0
5822.70 N
5864.67 N
5906.76 N
5948.99 N
5991.32 N
3642.88 E
3668.06 E
3692.91 E
3717.45 E
3741.69 E
9600.0
9650.0
9700.0
9750.0
9800.0
76.90 29.29 4685.7
76.98 28.82 4697.0
77.71 28.36 4708.0
77.22 28.12 4718.8
76.81 27.83 4730.1
7104.6 .84 7112.4 32.0
7153.3 .94 7161.0 31.9
7202.1 1.70 7209.7 31.9
7250.9 1.08 7258.5 31.9
7299.6 .99 7307.1 31.9
6033.74 N
6076.31 N
6119.15 N
6162.15 N
6205.18 N
3765.66 E
3789.32 E
3812.66 E
3835.76 E
3858.61 E
9850.0
9900.0
9950.0
10000.0
10050.0
77.47 27.72 4741.2
77.60 27.55 4752.0
77.28 27.10 4762.9
77.18 26.87 4773.9
77.81 27.01 4784.7
7348.3 1.33 7355.7 31.8
7397.1 .42 7404.4 31.8
7445.9 1.08 7453.0 31.8
7494.6 .49 7501.6 31.8
7543.4 1.28 7550.3 31.7
6248.31 N
6291.56 N
6334.92 N
6378.37 N
6421.89 N
3881.32 E
3903.97 E
3926.37 E
3948.50 E
3970.62 E
10100.0
10150.0
10200.0
10250.0
10300.0
77.95 26.96 4795.2
78.37 27.44 4805.5
78.48 27.58 4815.5
78.77 28.22 4825.4
78.41 28.40 4835.3
7592.2 .30 7599.0 31.7
7641.1 1.26 7647.8 31.7
7690.1 .34 7696.6 31.6
7739.1 1.38 7745.5 31.6
7788.1 .80 7794.5 31.6
6465.45 N
6508.97 N
6552.42 N
6595.74 N
6638.89 N
3992.80 E
4015.17 E
4037.80 E
4060.73 E
4083.98 E
10350.0
10400.0
10450.0
10500.0
10550.0
78.48 28.97 4845.3
78.23 28.85 4855.4
77.98 28.49 4865.7
78.09 28.53 4876.1
78.38 29.03 4886.3
7837.1 1.14 7843.4 31.6
7886.0 .57 7892.3 31.6
7935.0 .86 7941.2 31.5
7983.9 .24 7990.0 31.5
8032.8 1.14 8038.9 31.5
6681.86 N
6724.73 N
6767.66 N
6810.64 N
6853.54 N
4107.49 E
4131.16 E
4154.64 E
4177.98 E
4201.55 E
B.P. EXPLORATION
F PAD, WELL NO. MPF-41
MILNE POINT FIELD, ALASKA
Job Number: A0697GCE408
A Gy r o d a t
a D i re c t i ona i
Survey
Page
MEASURED
DEPTH
feet
I N C L AZIMUTH VERTICAL
DEPTH
deg. deg. feet
VERTICAL DOGLEG CLOSURE
SECTION SEVERITY DIST. AZIMUTH
feet deg./ feet deg.
100 ft.
HORIZONTAL
COORDINATES
feet
10600.0
10650.0
10700.0
10750.0
10800.0
78.19 29.23 4896.4
78.53 29.87 4906.5
78.07 29.59 4916.6
77.98 29.32 4927.0
77.64 28.93 4937.6
8081.8
8130.7
8179.7
8228.6
8277.5
.55 8087.8 31.5
1.43 8136.8 31.5
1.06 8185.7 31.5
.57 8234.6 31.5
1.02 8283.4 31.4
6896.31 N 4225.39 E
6938.91 N 4249.54 E
6981.42 N 4273.82 E
7024.01 N 4297.88 E
7066.70 N 4321.66 E
10850.0
10900.0
10950.0
11000.0
11050.0
77.54 28.74 4948.3
77.74 29.03 4959.0
78.03 29.22 4969.5
77.83 28.93 4980.0
77.60 28.79 4990.6
8326.3
8375.2
8424.0
8472.9
8521.8
.43 8332.2 31.4
.70 8381.0 31.4
.68 8429.8 31.4
.69 8478.7 31.4
.54 8527.5 31.4
7109.48 N
7152.24 N
7194.95 N
7237.68 N
7280.47 N
4345.21 E
4368.81 E
4392.60 E
4416.36 E
4439.94 E
11100.0
11150.0
11200.0
11250.0
11300.0
77.74 29.58 5001.3
77.91 29.87 5011.8
77.70 29.56 5022.4
77.33 29.49 5033.2
77.62 30.33 5044.0
8570.6
8619.5
8668.4
8717.2
8766.0
1.58 8576.3 31.4
.66 8625.2 31.4
.74 8674.0 31.3
.75 8722.8 31.3
1.72 8771.6 31.3
7323.11 N
7365.56 N
7408.00 N
7450.48 N
7492.79 N
4463.76 E
4488.00 E
4512.22 E
4536.28 E
4560.62 E
11350.0
11400.0
11450.0
11500.0
11550.0
77.78 30.57 5054.7
77.47 30.21 5065.4
77.28 29.97 5076.3
77.04 29.71 5087.5
76.94 29.46 5098.7
8814.9
8863.7
8912.5
8961.2
9009.9
.58 8820.5 31.3
.94 8869.3 31.3
.59 8918.1 31.3
.70 8966.8 31.3
.53 9015.5 31.3
7534.91 N
7577.03 N
7619.25 N
7661.53 N
7703.90 N
4585.37 E
4610.08 E
4634.54 E
4658.80 E
4682.86 E
11600.0
11650.0
11700.0
11750.0
11800.0
76.40 29.19 5110.2
76.28 28.74 5122.1
75.70 28.26 5134.2
76.10 28.42 5146.3
76.66 28.72 5158.1
9058.6
9107.2
9155.7
9204.2
9252.7
1.20 9064.1 31.3
.90 9112.7 31.3
1.51 9161.1 31.3
.86 9209.6 31.2
1.27 9258.1 31.2
7746.31 N
7788.82 N
7831.45 N
7874.13 N
7916.81 N
4706.69 E
4730.22 E
4753.37 E
4776.38 E
4799.62 E
A Gyroda t a Di re c t iona i Survey
B.P. EXPLORATION
F PAD, WELL NO. MPF-41
MILNE POINT FIELD, ALASKA
Job Number: A0697GCE408
Page
10
MEASURED
DEPTH
feet
I N C L AZIMUTH VERTICAL
DEPTH
deg. deg. feet
VERTICAL DOGLEG CLOSURE
SECTION SEVERITY DIST. AZIMUTH
feet deg./ feet deg.
100 ft.
HORIZONTAL
COORDINATES
feet
11850.0
11900.0
11950.0
12000.0
12050.0
76.60 29.13 5169.7
76.87 29.57 5181.2
76.79 29.35 5192.5
76.97 29.10 5203.9
77.18 29.87 5215.1
9301.4 .80 9306.7 31.2
9350.1 1.02 9355.3 31.2
9398.7 .47 9404.0 31.2
9447.4 .62 9452.7 31.2
9496.2 1.55 9501.4 31.2
7959.39 N
8001.80 N
8044.19 N
8086.69 N
8129.11 N
4823.15 E
4847.01 E
4870.95 E
4894.72 E
4918.71 E
12100.0
12150.0
12200.0
12250.0
12300.0
77.44 30.25 5226.1
77.24 29.90 5237.0
77.25 29.69 5248.1
77.42 29.53 5259.0
77.09 29.37 5270.1
9544.9 .92 9550.1 31.2
9593.7 .81 9598.9 31.2
9642.5 .40 9647.7 31.2
9691.3 .46 9696.4 31.2
9740.0 .74 9745.2 31.1
8171.33 N
8213.55 N
8255.87 N
8298.28 N
8340.75 N
4943.14 E
4967.59 E
4991.82 E
5015.92 E
5039.90 E
12350.0
12400.0
12450.0
12500.0
12550.0
76.92 29.12 5281.3
76.59 28.80 5292.8
76.59 28.51 5304.3
76.33 28.49 5316.1
77.24 29.11 5327.5
9788.8 .59 9793.9 31.1
9837.4 .92 9842.5 31.1
9886.1 .55 9891.1 31.1
9934.7 .53 9939.7 31.1
9983.3 2.18 9988.3 31.1
8383.26 N
8425.84 N
8468.52 N
8511.24 N
8553.90 N
5063.70 E
5087.26 E
5110.58 E
5133.78 E
5157.23 E
12600.0
12650.0
12700.0
12750.0
12800.0
77.28 29.33 5338.5
77.64 30.08 5349.4
77.56 30.00 5360.1
77.40 29.87 5370.9
77.28 29.59 5381.9
10032.1 .45 10037.0 31.1
10080.9 1.62 10085.8 31.1
10129.7 .22 10134.7 31.1
10178.6 .41 10183.5 31.1
10227.3 .60 10232.2 31.1
8596.46 N
8638.85 N
8681.13 N
8723.43 N
8765.79 N
5181.04 E
5205.22 E
5229.67 E
5254.02 E
5278.22 E
12850.0
12900.0
12950.0
13000.0
13050.0
77.07 29.43 5393.0
77.02 29.13 5404.2
76.94 28.87 5415.5
76.80 28.71 5426.8
76.53 28.57 5438.4
10276.1 .52 10281.0 31.0
10324.8 .59 10329.7 31.0
10373.5 .53 10378.4 31.0
10422.2 .42 10427.0 31.0
10470.9 .59 10475.6 31.0
8808.22 N
8850.72 N
8893.33 N
8936.01 N
8978.70 N
5302.23 E
5326.06 E
5349.67 E
5373.12 E
5396.44 E
A Gyrodat a D i re c t iona i Survey
B.P. EXPLORATION
F PAD, WELL NO. MPF-41
MILNE POINT FIELD, ALASKA
Job Number: A0697GCE408
Page
11
MEASURED
DEPTH
feet
I N C L AZIMUTH VERTICAL
DEPTH
deg. deg. feet
VERTICAL
SECTION
feet
DOGLEG CLOSURE
SEVERITY DIST. AZIMUTH
deg./ feet deg.
100 ft.
HORIZONTAL
COORDINATES
feet
13100.0
13150.0
13200.0
13250.0
13300.0
76.63 29.24 5450.0 10519.5
76.84 29.39 5461.4 10568.2
76.55 29.16 5473.0 10616.8
76.83 28.81 5484.5 10665.5
76.66 28.35 5495.9 10714.1
.30 10524.2 31.0
.52 10572.9 31.0
.75 10621.5 31.0
.88 10670.1 31.0
.97 10718.8 31.0
9021.28 N 5419.95 E
9063.71 N 5443.78 E
9106.16 N 5467.57 E
9148.72 N 5491.15 E
9191.46 N 5514.43 E
13350.0
13400.0
13450.0
13500.0
13550.0
76.23 28.24 5507.6
76.11 28.00 5519.6
76.08 28.12 5531.6
76.27 28.81 5543.6
76.06 28.59 5555.5
10762
10811
10859
10908
10956
.7
.3
.8
.4
.9
.89 10767.3 30.9
.52 10815.8 30.9
.23 10864.3 30.9
.39 10912.8 30.9
.59 10961.3 30.9
9234.26 N
9277.07 N
9319.90 N
9362.59 N
9405.17 N
5537.47 E
5560.36 E
5583.19 E
5606.33 E
5629.64 E
13600.0
13650.0
13700.0
13750.0
13800.0
75.99 28.22 5567.6
76.20 28.09 5579.6
76.18 27.79 5591.5
76.32 28.45 5603.4
76.40 28.90 5615.2
11005
11053
11102
11151
11199
.4
.9
.5
.0
.6
.72 11009.8 30.9
.49 11058.3 30.9
.58 11106.7 30.9
.31 11155.3 30.9
.90 11203.8 30.8
9447.85 N
9490.64 N
9533.54 N
9576.37 N
9619.00 N
5652.72 E
5675.62 E
5698.37 E
5721.26 E
5744.58 E
13850.0
13900.0
13950.0
14000.0
14050.0
76.27 28.62 5627.0
75.94 28.41 5639.0
76.59 28.95 5650.9
76.65 28.79 5662.5
76.42 28.64 5674.1
11248
11296
11345
11394
11442
.2
.7
.3
.0
.6
.61 11252.4 30.8
.76 11300.9 30.8
.66 11349.4 30.8
.33 11398.0 30.8
.55 11446.6 30.8
9661.59 N
9704.24 N
9746.85 N
9789.45 N
9832.10 N
5767.96 E
5791.13 E
5814.44 E
5837.93 E
5861.29 E
14100.0
14150.0
14200.0
14250.0
14300.0
76.32 28.77 5685.9 11491.2
77.03 29.21 5697.4 11539.8
76.95 28.99 5708.7 11588.5
76.73 28.79 5720.1 11637.2
76.92 29.03 5731.5 11685.9
.32 11495.2 30.8
.66 11543.8 30.8
.45 11592.5 30.8
.59 11641.2 30.8
.60 11689.8 30.8
9874.71 N
9917.27 N
9959.84 N
10002.46 N
10045.08 N
5884.63 E
5908.21 E
5931.91 E
5955.43 E
5978.96 E
A Gyroda t a D i r e c t i ona i Survey
B.P. EXPLORATION
F PAD, WELL NO. MPF-41
MILNE POINT FIELD, ALASKA
Job Number: A0697GCE408
Page
12
MEASURED
DEPTH
feet
I N C L AZIMUTH VERTICAL
DEPTH
deg. deg. feet
VERTICAL
SECTION
feet
DOGLEG CLOSURE
SEVERITY DIST. AZIMUTH
deg. / feet deg.
100 ft.
HORIZONTAL
COORDINATES
feet
14350.0
14400.0
14450.0
14500.0
14550.0
77.56 29.54 5742.5
77.36 29.24 5753.4
77.03 29.04 5764.4
76.83 28.89 5775.7
76.54 28.64 5787.3
11734.7
11783.5
11832.2
11880.9
11929.6
.62 11738.6 30.8
.71 11787.4 30.7
.77 11836.1 30.7
.50 11884.8 30.7
.74 11933.4 30.7
10087.61 N
10130.14 N
10172.72 N
10215.34 N
10257.99 N
6002.82 E
6026.77 E
6050.51 E
6074.10 E
6097.51 E
14600.0
14650.0
14700.0
14750.0
14800.0
77.19 29.04 5798.6
77.36 29.26 5809.6
77.24 29.12 5820.6
76.99 28.90 5831.8
76.80 28.75 5843.1
11978.3
12027.0
12075.8
12124.6
12173.3
.51 11982.1 30.7
.55 12030.8 30.7
.36 12079.6 30.7
.65 12128.3 30.7
.48 12177.0 30.7
10300.64 N
10343.24 N
10385.82 N
10428.44 N
10471.11 N
6121.00 E
6144.75 E
6168.54 E
6192.18 E
6215.66 E
14850.0
14900.0
14950.0
15000.0
15050.0
15100.0
15150.0
15200.0
15250.0
15300.0
76.95 28.63 5854.5
77.52 29.04 5865.5
77.57 28.88 5876.3
77.53 28.71 5887.1
77.46 28.47 5897.9
77.34 28.26 5908.8
77.26 27.97 5919.8
77.08 27.74 5930.9
77.35 28.27 5942.0
77.40 28.26 5952.9
12222.0
12270.7
12319.5
12368.4
12417.2
12466.0
12514.7
12563.5
12612.2
12661.0
.37 12225.6 30.7
1.40 12274.4 30.7
.35 12323.2 30.7
.34 12372.0 30.7
.48 12420.8 30.7
.49 12469.5 30.6
.58 12518.2 30.6
.57 12566.9 30.6
1.16 12615.6 30.6
.10 12664.4 30.6
10513.82 N
10556.54 N
10599.26 N
10642.04 N
10684.91 N
10727.84 N
10770.86 N
10813.97 N
10857.02 N
10899.99 N
6239.04 E
6262.56 E
6286.20 E
6309.71 E
6333.07 E
6356.26 E
6379.24 E
6402.02 E
6424.92 E
6448.03 E
15350.0
15400.0
15450.0
15500.0
15550.0
77.35 28.14 5963.8
77 . 28 28 . 14 5974 . 8
77.45 28.77 5985.8
77.44 28.93 5996.6
77.25 28.87 6007.6
12709.8
12758.5
12807.3
12856.1
12904.9
.26 12713.1 30.6
.15 12761.9 30.6
.27 12810.6 30.6
.33 12859.4 30.6
.39 12908.2 30.6
10942.99 N
10986.00 N
11028.90 N
11071.64 N
11114.35 N
6471.08 E
6494.09 E
6517.33 E
6540.88 E
6564.46 E
A Gyroda t a D i r e c t i ona i Survey
B.P. EXPLORATION
F PAD, WELL NO. MPF-41
MILNE POINT FIELD, ALASKA
Job Number: A0697GCE408
Page
13
MEASURED I N C L AZIMUTH VERTICAL
DEPTH DEPTH
feet deg. deg. feet
VERTICAL DOGLEG CLOSURE
SECTION SEVERITY DIST. AZIMUTH
feet deg./ feet deg.
100 ft.
HORIZONTAL
COORDINATES
feet
15600.0 77.03 29.10 6018.7
15650.0 77.44 29.80 6029.8
15700.0 77.47 29.71 6040.6
15750.0 77.39 29.57 6051.5
15800.0 77.34 29.34 6062.4
12953.7 .64 12956.9 30.6
13002.4 1.59 13005.7 30.6
13051.2 .18 13054.5 30.6
13100.0 .31 13103.3 30.6
13148.8 .47 13152.0 30.5
11156.99 N
11199.46 N
11241.83 N
11284.24 N
11326.72 N
6588.08 E
6612.06 E
6636.28 E
6660.42 E
6684.41 E
15850.0 77.34 29.18 6073.4
15900.0 77.24 29.05 6084.4
15950.0 77.02 28.84 6095.5
16000.0 76.89 28.66 6106.8
16050.0 76.74 28.53 6118.2
13197.6 .30 13200.8 30.5
13246.4 .33 13249.6 30.5
13295.1 .60 13298.3 30.5
13343.8 .44 13347.0 30.5
13392.5 .40 13395.6 30.5
11369.28 N
11411.90 N
11454.55 N
11497.25 N
11540.00 N
6708.25 E
6731.99 E
6755.58 E
6779.01 E
6802.31 E
16100.0 76.97 29.03 6129.6
16150.0 76.81 28.99 6140.9
16200.0 76.75 28.75 6152.4
16250.0 76.57 28.67 6163.9
16300.0 76.71 29.71 6175.5
13441.2 1.08 13444.3 30.5
13489.9 .32 13493.0 30.5
13538.6 .50 13541.6 30.5
13587.2 .39 13590.3 30.5
13635.9 2.05 13638.9 30.5
11582.67 N
11625.26 N
11667.89 N
11710.56 N
11753.03 N
6825.75 E
6849.37 E
6872.87 E
6896.24 E
6919.96 E
16350.0 76.73 29.61 6186.9
16400.0 76.63 29.46 6198.5
16450.0 76.48 29.15 6210.1
16500.0 76.42 29.01 6221.8
16550.0 76.47 29.07 6233.5
13684.5 .19 13687.6 30.5
13733.2 .35 13736.2 30.5
13781.8 .68 13784.8 30.5
13830.4 .30 13833.4 30.5
13879.0 .16 13882.0 30.5
11795.31 N
11837.64 N
11880.05 N
11922.53 N
11965.03 N
6944.04 E
6968.03 E
6991.84 E
7015.46 E
7039.06 E
16600.0 77.30 29.49 6244.9
16650.0 77.13 29.46 6255.9
16700.0 76.83 29.51 6267.2
16750.0 76.89 29.66 6278.5
16800.0 77.88 29.77 6289.5
13927.7 1.85 13930.7 30.5
13976.5 .36 13979.4 30.5
14025.2 .60 14028.2 30.5
14073.9 .30 14076.8 30.5
14122.7 1.98 14125.6 30.5
12007.50 N
12049.95 N
12092.35 N
12134.70 N
12177.07 N
7062.87 E
7086.87 E
7110.85 E
7134.89 E
7159.07 E
A Gyr oda t a D i re c t i ona i Survey
B.P. EXPLORATION
F PAD, WELL NO. MPF-41
MILNE POINT FIELD, ALASKA
Job Number: A0697GCE408
Page
14
MEASURED I N C L AZIMUTH VERTICAL
DEPTH DEPTH
feet deg. deg. feet
VERTICAL DOGLEG CLOSURE
SECTION SEVERITY DIST. AZIMUTH
feet deg./ feet deg.
100 ft.
HORIZONTAL
COORDINATES
feet
16850.0 77.68 29.61 6300.0
16900.0 77.44 29.52 6310.8
16950.0 77.35 29.46 6321.7
17000.0 77.29 29.31 6332.7
17050.0 77.33 29.26 6343.7
14171.5 .50 14174.5 30.4
14220.4 .52 14223.3 30.4
14269.2 .21 14272.1 30.4
14317.9 .33 14320.9 30.4
14366.7 .12 14369.6 30.4
12219.53 N
12261.99 N
12304.47 N
12346.97 N
12389.52 N
7183.28 E
7207.37 E
7231.39 E
7255.32 E
7279.18 E
17100.0 77.36 29.22 6354.6
17150.0 77.38 29.15 6365.6
17200.0 77.20 28.99 6376.6
17250.0 77.35 28.81 6387.6
17300.0 77.02 28.66 6398.7
14415.5 .10 14418.4 30.4
14464.3 .13 14467.2 30.4
14513.1 .47 14516.0 30.4
14561.8 .46 14564.7 30.4
14610.6 .72 14613.4 30.4
12432.09 N
12474.69 N
12517.32 N
12560.02 N
12602.77 N
7303.01 E
7326.80 E
7350.50 E
7374.07 E
7397.51 E
17350.0 76.98 28.53 6409.9
17400.0 76.94 28.46 6421.2
17450.0 77.10 28.41 6432.4
17500.0 76.92 28.52 6443.7
17550.0 75.72 28.88 6455.5
17600.0 75.27 28.81 6468.0
17650.0 73.93 28.81 6481.3
17700.0 73.57 28.77 6495.3
17750.0 71.99 29.20 6510.1
17800.0 71.44 29.34 6525.8
14659.3 .27 14662.1 30.4
14708.0 .15 14710.8 30.4
14756.7 .34 14759.5 30.4
14805.4 .43 14808.2 30.4
14854.0 2.49 14856.8 30.4
14902 . 4 . 91 14905 . 2 30 . 4
14950 . 6 2 . 69 14953 . 3 30 . 4
14998.6 .72 15001.3 30.4
15046.4 3.26 15049.1 30.4
15093.9 1.13 15096.5 30.4
12645.54 N
12688.35 N
12731.19 N
12774.02 N
12816.64 N
12859.04 N
12901.27 N
12943.34 N
12985.12 N
13026.53 N
7420.82 E
7444.06 E
7467.26 E
7490.48 E
7513.81 E
7537.17 E
7560.40 E
7583.52 E
7606.66 E
7629.87 E
17850.0 69.86 30.17 6542.4
17900.0 69.28 30.43 6559.8
17950.0 67.44 31.16 6578.2
18000.0 66.31 31.32 6597.9
18050.0 64.55 31.65 6618.7
15141.0 3.54 15143.7 30.4
15187.9 1.25 15190.6 30.4
15234.3 3.92 15237.0 30.4
15280.3 2.28 15283.0 30.4
15325.7 3.57 15328.5 30.4
13067.48 N
13107.94 N
13147.86 N
13187.18 N
13225.95 N
7653.28 E
7676.92 E
7700.71 E
7724.56 E
7748.31 E
A Gyroda t a D i re c t i ona i Survey
B.P. EXPLORATION
F PAD, WELL NO. MPF-41
MILNE POINT FIELD, ALASKA
Job Number: A0697GCE408
Page
15
MEASURED
DEPTH
feet
I N C L AZIMUTH VERTICAL
DEPTH
deg. deg. feet
VERTICAL DOGLEG CLOSURE
SECTION SEVERITY DIST. AZIMUTH
feet deg./ feet deg.
100 ft.
HORIZONTAL
COORDINATES
feet
18100.0
18150.0
18200.0
18250.0
18300.0
63.70 31.47 6640.5
61.67 31.73 6663.4
60.48 31.73 6687.6
58.65 31.94 6712.9
57.26 31.22 6739.5
15370.7 1.73 15373.5 30.4
15415.1 4.10 15417.9 30.4
15458.8 2.36 15461.6 30.4
15501.9 3.68 15504.7 30.4
15544.2 3.04 15547.1 30.4
13264.29 N
13302.13 N
13339.35 N
13375.97 N
13412.08 N
7771.85 E
7795.13 E
7818.14 E
7840.88 E
7863.08 E
18350
18400
18450
18500
18550
.0
.0
.0
.0
.0
55.33 30.85 6767.2
53.43 30.79 6796.3
51.56 30.36 6826.8
49.84 29.92 6858.4
47.85 29.21 6891.3
15585.8 3.92 15588.7 30.4
15626.4 3.80 15629.3 30.4
15666.1 3.80 15669.0 30.4
15704.7 3.50 15707.7 30.4
15742.4 4.13 15745.3 30.4
13447.72 N
13482.62 N
13516.77 N
13550.22 N
13582.96 N
7884.53 E
7905.35 E
7925.52 E
7944.95 E
7963.53 E
18600
18650
18700
18750
18800
.0
.0
.0
.0
.0
46.03 28.57 6925.5
44.39 28.26 6960.7
42.69 28.98 6997.0
41.31 29.51 7034.1
40.09 29.40 7072.0
15778.9 3.76 15781.8 30.4
15814.4 3.30 15817.3 30.4
15848.8 3.54 15851.7 30.4
15882.3 2.84 15885.2 30.4
15914.9 2.45 15917.8 30.4
13614.95 N
13646.15 N
13676.39 N
13705.58 N
13733.97 N
7981.18 E
7998.06 E
8014.56 E
8030.90 E
8046.93 E
18850
18900
18950
19000
19050
.0
.0
.0
.0
.0
39.58 28.99 7110.4
38.77 28.65 7149.2
38.69 28.39 7188.2
38.26 28.03 7227.3
37.95 27.43 7266.7
15946.9 1.13 15949.8 30.4
15978.5 1.69 15981.4 30.4
16009.8 .36 16012.6 30.4
16040.9 .98 16043.7 30.4
16071.7 .95 16074.5 30.3
13761.93 N
13789.60 N
13817.09 N
13844.50 N
13871.81 N
8062.55 E
8077.78 E
8092.72 E
8107.42 E
8121.78 E
19100.0
19150.0
19200.0
19250.0
19300.0
37.47 26.89 7306.2
37.18 26.40 7346.0
36.82 26.00 7385.9
36.59 26.05 7426.0
36.68 25.92 7466.1
16102.3 1.17 16105.1 30.3
16132.6 .82 16135.3 30.3
16162.6 .87 16165.3 30.3
16192.5 .47 16195.1 30.3
16222.3 .23 16224.9 30.3
13899.02 N
13926.12 N
13953.12 N
13979.97 N
14006.79 N
8135.74 E
8149.34 E
8162.62 E
8175.73 E
8188.80 E
A Gyrodat a D i r e c t iona i Survey
B.P. EXPLORATION
F PAD, WELL NO. MPF-41
MILNE POINT FIELD, ALASKA
Job Number: A0697GCE408
Page
16
MEASURED
DEPTH
feet
I N C L AZIMUTH VERTICAL
DEPTH
deg. deg. feet
VERTICAL DOGLEG CLOSURE
SECTION SEVERITY DIST. AZIMUTH
feet deg./ feet deg.
100 ft.
HORIZONTAL
COORDINATES
feet
19350.0 36.23 25.80 7506.3
19400.0 36.33 25.52 7546.6
19450.0 36.07 25.55 7587.0
19500.0 36.36 25.32 7627.3
19550.0 36.50 25.39 7667.6
16251.9 .91 16254.5 30.3
16281.4 .38 16284.0 30.3
16310.9 .52 16313.4 30.3
16340.4 .64 16342.8 30.3
16370.0 .30 16372.4 30.3
14033.53 N
14060.19 N
14086.84 N
14113.51 N
14140.34 N
8201.76 E
8214.57 E
8227.30 E
8239.99 E
8252.70 E
19600.0 36.44 25.50 7707.8
19650.0 36.49 25.69 7748.0
19700.0 36.37 25.75 7788.2
16399.6 .17 16402.0 30.3
16429.3 .25 16431.7 30.3
16458.9 .26 16461.3 30.2
14167.18 N
14193.98 N
14220.73 N
8265.47 E
8278.31 E
8291.20 E
Final Station Closure: Distance: 16461.26 ft Az: 30.24 deg.
A Gyroda t a D i re c t i onal Survey
for
B.P. EXPLORATION
F PAD, WELL NO. MPF-41
MILNE POINT FIELD, ALASKA
Job Number: SUB408
Run Date: 21-Jun-97 12:00:00
Surveyor: TOM STODDARD
Calculation Method: MINIMUM CURVATURE
Survey Latitude: 70.505000 deg. N
Sub-sea Correction from Vertical Reference: 41.3 ft.
Azimuth Correction:
Gyro: Bearings are Relative to True North
Proposed Well Direction: 29.280 deg
Vertical Section Calculated from Well Head Location
Closure Calculated from Well Head Location
Horizontal Coordinates Calculated from Local Horizontal Reference
A Gyrodat a D i re c t ional Survey
B.P. EXPLORATION
F PAD, WELL NO. MPF-41
MILNE POINT FIELD, ALASKA
Job Number: SUB408
Page
SUBSEA
DEPTH
feet
I N C L AZIMUTH VERTICAL
DEPTH
deg. deg. feet
VERTICAL DOGLEG CLOSURE
SECTION SEVERITY DIST. AZIMUTH
feet deg./ feet deg.
100 ft.
HORIZONTAL
COORDINATES
feet
-41
100
200
300
400
.3
.0
.0
.0
.0
0.00 0.00 0.0
.18 162.99 141.3
.52 47.70 241.3
1.64 67.38 341.3
2.82 72.03 441.3
0.0 0.00 0.0 0.0
-.2 .28 .4 254.9
.1 .63 .8 176.3
1.6 1.13 3.8 59.5
4.5 1.18 8.9 67.8
0.00 N 0.00 E
.07 S .27 W
.22 N .47 E
.86 N 1.75 E
2.14 N 5.43 E
5O0
600
700
800
900
.0
.0
.0
.0
.0
3.74 72.05 541.3
4.80 71.89 641.3
6.31 73.33 741.3
7.44 72.84 841.3
9.12 70.45 941.3
8.7 .92 15.5 70.1
14 . 2 1 . 07 24 . 0 70 . 9
21.3 1.51 35.2 71.5
30.0 1.14 48.5 72.0
40.7 1.72 64.3 71.9
3.91 N 10.88 E
6.21 N 17.97 E
9.08 N 27.26 E
12.60 N 38.80 E
17.23 N 52.56 E
1000
1100
1200
1300
1400
.0
.0
.0
.0
.0
11.36 68.10 1041.3
13.15 67.35 1141.3
14.75 65.90 1241.3
16.15 61.60 1341.3
18.82 55.68 1441.3
54.7 2.24 84.3 71.2
71.7 1.75 106.9 70.4
91.1 1.48 132.2 69.7
113.8 2.06 159.9 68.6
141.4 2.90 191.1 66.8
23.72 N 69.46 E
31.96 N 89.54 E
41.59 N 112.13 E
53.72 N 136.86 E
70.31 N 163.78 E
1500
1600
1700
1800
1900
.0
.0
.0
.0
.0
19.54 50.05 1541.3
20.45 49.55 1641.3
23.17 50.33 1741.3
25.25 50.86 1841.3
27.73 50.01 1941.3
173.8 1.27 223.6 64.4
207.6 1.56 257.1 62.3
244.9 2.82 294.4 60.6
286.9 1.66 335.5 59.2
333.0 2.85 402.9 58.1
91.78 N 191.65 E
115.11 N 219.11 E
140.78 N 249.63 E
169.39 N 284.50 E
200.82 N 322.67 E
2000.0
2100.0
2200.0
2300.0
2400.0
30.46 50.04 2041.3
33.35 49.36 2141.3
34.68 44.70 2241.3
34.88 39.35 2341.3
35.65 35.44 2441.3
384.8 2.88 452.6 57.1
443.3 2.15 506.1 56.2
508.0 3.40 590.0 55.1
575.5 2.70 645.4 53.7
645.6 1.44 701.1 52.1
236.40 N 365.15 E
276.78 N 412.84 E
322.67 N 463.12 E
374.07 N 509.48 E
430.46 N 552.35 E
A Gyroda t a D i r e c t i ona i Survey
B.P. EXPLORATION
F PAD, WELL NO. MPF-41
MILNE POINT FIELD, ALASKA
Job Number: SUB408
Page
SUBSEA
DEPTH
feet
I N C L AZIMUTH VERTICAL
DEPTH
deg. deg. feet
VERTICAL DOGLEG CLOSURE
SECTION SEVERITY DIST. AZIMUTH
feet deg./ feet deg.
100 ft.
H O R I Z O N T A L
COORDINATES
feet
2500.0
2600.0
2700.0
2800.0
2900.0
35.51 32.30 2541.3
37.57 31.16 2641.3
40.20 30.75 2741.3
43 . 04 30 . 98 2841.3
46.05 31.57 2941.3
717.0 .47 784.1 50.3
789.7 3.42 840.5 48.8
870.4 2.04 931.2 47.2
959.2 2.03 1028.7 45.8
1057.7 1.97 1097.6 44.5
490.34 N 591.45 E
552.16 N 629.96 E
621.45 N 671.39 E
697.76 N 716.84 E
781.89 N 768.29 E
3000.0
3100.0
3200.0
3300.0
3400.0
49.60 31.15 3041.3
52 . 56 31 . 52 3141 . 3
56.46 30.29 3241.3
60.67 28.92 3341.3
66.05 28.33 3441.3
1168.1 2.47 1206.1 43.3
1292.6 1.06 1360.1 42.2
1433.1 2.06 1481.2 41.1
1596.4 2.50 1649.6 40.0
1795.9 2.56 1825.9 38.7
876.50 N 825.24 E
982.57 N 890.62 E
1103.18 N 962.79 E
1245.21 N 1043.40 E
1420.50 N 1138.69 E
3500.0
3600.0
3700.0
3800.0
3900.0
74.53 29.39 3541.3
76.94 29.62 3641.3
77 . 90 29 . 98 3741 . 3
77.63 28.06 3841.3
76.60 29.79 3941.3
2073.6 3.33 2104.6 37.4
2505.1 1.60 2539.5 36.0
2971.6 .80 3026.4 35.1
3420.5 .77 3463.3 34.3
3876.7 1.57 3901.2 33.7
1663.91 N
2040.34 N
2442.85 N
2835.88 N
3234.59 N
1272.33 E
1483.22 E
1719.25 E
1936.09 E
2157.80 E
4000.0
4100.0
4200.0
4300.0
4400.0
76.47 30.82 4041.3
76 . 97 29 . 60 4141 . 3
76.77 28.78 4241.3
78.13 29.46 4341.3
76.62 28.88 4441.3
4304.5 .21 4338.7 33.4
4718.8 .42 4775.6 33.1
5158.2 .85 5213.4 32.8
5587.7 .38 5602.3 32.5
6013.5 .79 6039.5 32.2
3603.82 N
3961.87 N
4344.59 N
4720.16 N
5093.06 N
2374.15 E
2582.58 E
2798.41 E
3006.81 E
3212.34 E
4500.0
4600.0
4700.0
4800.0
4900.0
77.60 31.41 4541.3
78.03 30.79 4641.3
77.47 27.72 4741.3
78.45 28.74 4841.3
77.61 28.86 4941.3
6447.7 .48 6477.8 32.1
6904.6 1.15 6917.3 32.0
7348.8 1.33 7404.4 31.8
7817.5 1.01 7843.4 31.6
8294.4 .82 8332.2 31.4
5469.11 N
5860.58 N
6248.71 N
6664.71 N
7081.53 N
3429.63 E
3665.60 E
3881.53 E
4098.10 E
4329.83 E
A Gyroda t a D i r e c t i ona i Survey
B.P. EXPLORATION
F PAD, WELL NO. MPF-41
MILNE POINT FIELD, ALASKA
Job Number: SUB408
Page
SUBSEA
DEPTH
feet
I N C L AZIMUTH VERTICAL
DEPTH
deg. deg. feet
VERTICAL
SECTION
feet
DOGLEG CLOSURE
SEVERITY DIST. AZIMUTH
deg./ feet deg.
100 ft.
HORIZONTAL
COORDINATES
feet
5O00
5100
5200
5300
5400
.0 77.54 30.12 5041.3 8753
.0 75.93 28.35 5141.3 9184
.0 77.24 29.82 5241.3 9612
.0 77.37 29.52 5341.3 10044
.0 76.55 28.74 5441.3 10483
.7
.1
.6
.6
.1
.47 8771.6 31.3
.13 9209.6 31.2
.65 9647.7 31.2
.75 10085.8 31.1
.77 10524.2 31.0
7482.09 N
7856.47 N
8229.95 N
8607.35 N
8989.45 N
4554.46 E
4766.86 E
4976.98 E
5187.25 E
5402.37 E
5500
5600
5700
5800
5900
.0 76.23 28.68 5541.3 10899
.0 76.07 28.52 5641.3 11306
.0 77.49 29.48 5741.3 11729
.0 76.83 28.77 5841.3 12165
.0 77.33 28.24 5941.3 12609
.2
.0
.4
.4
.2
1.17 10912.8 30.9
.93 11349.4 30.8
1.51 11738.6 30.8
.51 12177.0 30.7
1.12 12615.6 30.6
9354.51 N
9712.39 N
10082.99 N
10464.26 N
10854.35 N
5601.95 E
5795.59 E
6000.22 E
6211.89 E
6423.51 E
6000
6100
6200
6300
6400
6500
6600
6700
6800
6900
.0 77.46 29.70 6041.3 13054
.0 76.81 28.99 6141.3 13491
.0 77.04 29.36 6241.3 13912
.0 77.33 29.27 6341.3 14356
.0 76.95 28.50 6441.3 14795
.0 69.96 30.12 6541.3 15138
.0 63.63 31.48 6641.3 15372
.0 57.14 31.19 6741.3 15547
.0 50.77 30.16 6841.3 15683
.0 45.29 28.43 6941.3 15794
.3
.4
.4
.1
.1
.0
.3
.0
.8
.8
.19 13103.3 30.6
.33 13541.6 30.5
1.32 13930.7 30.5
· 17 14369.6 30.4
.41 14808.2 30.4
3.38 15143.7 30.4
1.82 15417.9 30.4
3.10 15588.7 30.4
3.66 15707.7 30.4
3.55 15817.3 30.4
11244.47 N
11626.62 N
11994.18 N
12380.28 N
12764.94 N
13064.86 N
13265.63 N
13414.43 N
13532.11 N
13628.96 N
6637.79 E
6850.11 E
7055.40 E
7274.00 E
7485.56 E
7651.78 E
7772.68 E
7864.50 E
7934.44 E
7988.76 E
7000.0 41.08 29.49 7041.3 15888.5
7100.0 38.93 28.72 7141.3 15972.1
7200.0 38.15 27.82 7241.3 16051.8
7300.0 37.22 26.46 7341.3 16129.0
7400.0 36.62 26.00 7441.3 16203.8
2.77 15917.8 30.4
1.57 15981.4 30.4
.97 16074.5 30.4
.86 16135.3 30.3
.37 16224.9 30.3
13710.96 N
13783.98 N
13854.21 N
13922.93 N
13990.20 N
8033.94 E
8074.69 E
8112.52 E
8147.73 E
8180.72 E
A Gyr oda t a D i r e c t i ona i Survey
B.P. EXPLORATION
F PAD, WELL NO. MPF-41
MILNE POINT FIELD, ALASKA
Job Number: SUB408
Page
SUBSEA I N C L AZIMUTH VERTICAL VERTICAL DOGLEG CLOSURE
DEPTH DEPTH SECTION SEVERITY DIST. AZIMUTH
feet deg. deg. feet feet deg./ feet deg.
100 ft.
H O R I Z O N T A L
COORDINATES
feet
7500.0 36.31
7600.0 36.41
7700.0 36.48
7746.9 36.37
25.56 7541.3 16277.5 .45 16284.0 30.3
25.35 7641.3 16350.6 .52 16372.4 30.3
25.66 7741.3 16424.4 .24 16431.7 30.3
25.75 7788.2 16458.9 .26 16461.3 30.2
14056.66 N
14122.82 N
14189.53 N
14220.73 N
8212.87 E
8244.40 E
8276.18 E
8291.20 E
Final Station Closure: Distance: 16461.26 ft Az: 30.24 deg.
4, QUALITY CONTROL
QUALITY CONTROL REPORT
JOB NUMBER: A0697GCE408
TOOL NUMBER: 778
MAXIMUM GYRO TEMPERATURE:
79.1 C
MAXIMUM AMBIENT TEMPERATURE: 81.5 C
MAXIMUM INCLINATION: 78.77
AVERAGE AZIMUTH: 30.24
WIRELINE REZERO VALUE: N/A
REZERO ERROR / K: N/A
CALIBRATION USED FOR FIELD SURVEY: 2037
CALIBRATION USED FOR FINAL SURVEY: 2037
PRE JOB MASS BALANCE OFFSET CHECK: -.3
POST JOB MASS BALANCE OFFSET CHECK]:
USED O.O/N/A CONTINUOUS
CONDITION OF SHOCK WATCHES
-.3
UPON ARRIVAL AT RIG: OK
UPON COMPLETION OF SURVEY: OK
UPON RETURN TO ATLAS OK
BOTTOM LINE COMPARISIONS
M.D. INC AZIMUTH TVD NORTHING EASTING
MWD 19574 36.51 25.84 7692 14139 8302
FINAL SURVEY 19700 36.37 25.75 7788 14221 8291
FUNCTION TEST
JOB NUMBER' A0697GCE408
5 Survey stations were collected at the measured depth shown below. The tables show the
repeatability of the gyro tool in both inclination and azimuth at one measured depth.
INCLINATION
M.D. ft 1 2 3 4 5
1195 13.99 13.99 13.99 13.99 13.99
AZIMUTH
M.D. ft 1 2 3 4 5
1195 67.21 67.17 67.15 67.30 67.25
5. EQUIPMENT AND CHRONOLOGICAL REPORT
EQUIPMENT REPORT
JOB NUMBER: A0697GCE408
DOWNHOLE ELECTRONICS
SURFACE ELECTRONICS '
PRIMARY
TOOL No. 778
GYRO SECTION
DATA SECTION
POWER SECTION
BACKUP
TOOL No. 770
GYRO SECTION
DATA SECTION
POWER SECTION
A0170
C0089
C0086
A0160
C0111
C0112
COMPUTER A0349
POWER SUPPLY
PRINTER A0079
INTERFACE A0143
COMPUTER A0222
POWER SUPPLY
PRINTER A0029
INTERFACE A0055
A0085
A0107
WIRELINE COMPANY:
CABLE SIZE: 3/8"
SCHLUMBERGER
RUNNING GEAR
SCHLUMBERGER HOUSING W/ROLLERS AND GAMMA RAY
TOTAL LENGTH OF TOOL 36'
MAXIMUM O.D.: 5.5 INCHES
TOTAL WEIGHT OF TOOL: 700 POUNDS
CHRONOLOGICAL REPORT
JOB NUMBER' A0697GCE408
WEDNESDAY,06/18/97
13:50 FLY TO DEADHORSE
16:30 ARRIVE DEADHORSE
19:00 CHECK TOOLS
THURSDAY, 06~19~97
07:45 FLY OTTER TO KUPARUK
09:30 STANDBY -RIG JOB FOR SCHLUMBERGER
FRIDAY,06/20/97
11:30
12:30
13:30
15:00
21:00
21:30
TO LOCATION
ARRIVE LOCATION
MU TOOL,
RUN USIT. COULDN'T GET DOWN.
MU GYRO/GAMMA COMBO.
CHECK TOOLS. O.K. RUN TOMORROW.
SATURDAY,06/21/97
06:15
07:30
08:00
10:00
11:50
12:15
16:15
20:30
21:30
22:15
TO LOCATION
PU TOOL,MU LUBRICATOR
START INRUN SURVEY
SURVEY CONTINUOUS TO 10000'-COULDN'T GET DOWN.
OUTRUN CONTINUOUS
ADD WEIGHT
SURVEY CONTINUOUS NON STOP TO 19700
OUTRUN CONTINUOUS
RIG DOWN
BRIDGE IN, KTN TO ATLAS
SUNDAY,06/22/97
07:00 PROCESS SURVEY, CHECK TOOL
12:30 RETURN TO MILNE POINT WITH RESULTS
14:00 RETURN TO DEADHORSE
17:25 FLY CHARTER TO ANCHORAGE
CI t:i I I--I-- I !~ G S ~ I::!~./! C E S
WELL LOG TRANSMITFAL
To:
State of Alaska
Alaska Oil and Gas Conservation Comm.
Attn.: Lori Taylor
3001 Porcupine Drive.
Anchorage, Alaska 99501 fi
MWD Formation Evaluation Logs - P2-45A,
AK-MM-70249
November 12, 1997
The technical data listed below is being submitted herewith. Please acknowledge receipt by returning a
signed copy of this transmittal letter to the attention off
Jan Galvin, Sperry-Sun Drilling Services, 5631 Silverado Way, #G, Anchorage, AK 99518
1 LDWG formatted Disc with verification listing.
API#: 50-029-22769-01
5631 Silverado Way, Suite G · Anchorage, AJaska 99518 ° (907) 563-3256 ° Fax (907) 563-7252
A Dresser Industries, Ino. Company
GeoQuest
500 W. International Airport Road
Anchorage, AK 99518-1199
ATTN: Sherrle
NO. 11525
Company:
Field:
Alaska Oil & Gas Cons Comm
Attn: Lori Taylor
3001 Porcupine Drive
Anchorage, AK 99501
Milne Point (Cased Hole)
11/5/97
Well Job # Log Description Date BL RF Sepia LIS Tape
MPC-6 {,~1C__- WATER FLOW LOG/TDTP-GR/CCL 970615 I 1
MPU C-8 L).~ ~ TDT WATER FLOW LOG 970927 I 1
UPU C-10 [_£t(~-- WATER FLOW. LOG W/RSTINVERTED 970911 I 1
MPE-10 · TUBING PUNCHER 970928 I 1
MPU E-22, TUBING LEAK DETECTION LOG 970702 I 1
MPU E-22 ~ TUBING PATCH RECORD 97071 9 I 1
MPU F-09 ~ PERFORATING RECORD 970712 I 1
MPU F-09 ,. !STATIC TEMP/PRESS SURVEY 97071 2 I 1
M PU F-09' . PERFORATING RECORD 97071 9 I 1
F-41 · CHEMICAL cu'rrER 970820 I 1
F-41 · CHEMICAL CUTTER 970829 1 1
MPU F-73 ' PERFORATION RECORD 97081 5 I 1
: MPG-09 ~ RFT 970702 I 1
MPH-11 ~ RFT 970903 I 1
MPU J-2 ~[(.~. WATER FLOW LOG/TDT-GR 970726 I 1
MPU J-09 ~1.[~.-- JETCUTI'ER RECORD 970807 I 1
MPK-43A · GAMMA RAY CORRELATION LOG 971 024 I 1
UPU L-9 {..I,~ ~ WATER FLOW LOG/'rDTP-GR/CCL 97061 4 I 1
MPU L-32 ~ GAMMA RAY CCL TCP CORRELATION LOG 970515 I 1
MPL-33 , TUBING CONVEYED PERF TIE-IN GR-CCL 971010 I 1
MPL-33 ' TIE-IN GR-CCL 971014 I I
c;jo ·
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO:
BP Exploration (Alaska) Inc.
Petrotectnical Data Center MB3-3
900 E. Benson Blvd.
Anchorage, Alaska 99519-6612
Date Delivered:
Schlumberger GeoQuest
500 W. International Airport Road
Anchorage, Alaska 99618-1199
Received by~t (
........ STATE OF ALASKA
ALASKA ...,L AND GAS CONSERVATION CO,,,,,dlSSION
APPLICATION FOR SUNDRY APPROVAL
Type of Request: [] Abandon [] Suspend [] Plugging [] Time Extension [] Perforate
[] Alter Casing [] Repair Well [] Pull Tubing [] Variance [] Other
[] Change Approved Program [] Operation Shutdown [] Re-Enter Suspended Well [] Stimulate Change Completion Program
2. Name of Operator
BP Exploration (Alaska)Inc.
3. Address
P.O. Box 196612, Anchorage, Alaska 99519-6612
t5. Type of well:
[~ Development
[~ Exploratory
[~ Stratigraphic
[~ Service
4. Location of well at surface
1955' NSL, 2625' WEL, SEC. 6, T13N, R10E, UM
At top of productive interval
217' NSL, 4892' WEL, SEC. 21, T14N, R10E, UM
At effective depth
367' NSL, 452' EVVL, SEC. 21, T14N, R10E, UM
At total depth
424' NSL, 481' EWL, SEC. 21, T14N, R10E, UM
Datum Elevation (DF or KB)
Plan RTE = 41.8'
7. Unit or Property Name
Milne Point Unit
8. Well Number
MPF-41i
9. Permit Number
97-95 / 397-121
10. APl Number
50-029-22770
11. Field and Pool
Milne Point Unit / Kuparuk River
Sands
12. Present well condition summary
Total depth: measured 19893 feet
true vertical 7949 feet
Effective depth: measured 19785 feet
true vertical 7862 feet
Casing Length Size
Structural
Conductor
Surface
Intermediate
Production
Liner
78' 20"
9273' 9-5/8"
19840' 7"
Plugs(measured)
Junk(measured)
ORIGINAL
Shear Sub and Ball at 9223'
Cemented
250 sx Arcticset I (Approx.)
1900 sx PF 'E', 993 sx Class 'G'
300 sx Class 'G'
MD
110'
9304'
19868'
TVD
110'
4614'
7928'
Perforation depth:
measured
true vertical
19475'-19487',19495'-19513',19521'-19555'
7612'-7622',7628'-7643',7649'-7677'
Tubing (size, grade, and measured depth) N/A
Packers and SSSV (type and measured depth) N/A
Si-jP 1 2 1997
.Oil & .Gas, C0r~s. C0racs~.
'' ~ncli0rage
13. Attachments [~ Description summary of proposal n Detailed operations program I~ BOP sketch
4. Estimated date for commencing operation
September 8, 1997
16. If proposal was verbally approved¢,./~
Blair Wondzell, Jack Hartz ]
Name of approver
Contact Engineer Name/Number: Bob Laule, 564-5195
9/8/97
Date approved
15. Status of well classifications as:
[~ Oil I--I Gas I--} Suspended
Service Water Injection
Prepared By Name/Number: Kathy Campoamor, 564-5122
17. I hereby certify that the foregoing is true and correct to the best of my knowledge
Signed Chip~vord //'~',~,, ~. ~--~'~ Title Senior Drilling Engineer
Commission Use Only
Date
Conditions of Approval: Notify Commission so representative may witness
Plug integrity_ BOP Test __ Location clearance
Mechanical Integrity Test I,,,/ Subsequent form required 10-
I Approval No.,,~fl.--145
Approved by order of the Commission
Form 10-403 Rev. 06/15/88
Original Signee u)
D~vid W ,1ohn_$ton
Commissioner
Date ¢2-'/~-? 7
Submit In Triplica~
State Of Alaska
AOGCC
3001 Porcupine Dr.
Anchorage, AK 99501
Blair Wondzell
BP Exploration Alaska
900 E. Benson Blvd
Anchorage, AK
Bob Laule
9-9-97
History of the completion of Milne Point Well F-41i:
Drilled by Nabors 22E June of 1997.
Bumped plug with 80 bbl diesel and seawater.
Tested casing to 4000 psi for 30 min 6-6-97.
Released Rig.
Production engineering ran bond log (top of cement picked at 18,830'). The well was perforated in the
Kuparuk "A" sands and set Retrievable Bridge Plug at 15,132'.
Nabors 4ES moved on 8-18-97.
Recovered RPB(5.986") at 15,132.
Attempted first completion with 4-1/2" tubing and Baker S-3 packer.
Packer stopped at 4615'.
Set packer. Cut and recovered the tubing.
Milled and recovered the packer.
Made cleanout run.
Attempted to rerun completion. Packer took weight at 4408 and again at 4697. POH.
Made numerous GR/JB run on wireline to 9800'.
Made cleanout casing scrape and bootbaskets run to PBTD.
Attempted to recomplete well with 4-1/2" tubing and Baker S3 packer. Packer stopped at 6990.
Set packer cut and recovered the tubing.
Mill and recovered the packer.
Made cleanout run with 6-1/16" Globe Basket worked through numerous tight spots. POH
Made cleanout run with 6-1/8" Reversing Basket worked through numerous tight spots to 8175 unable to
go any deeper. POH.
Reran 6-1/16" Globe Basket worked through numerous fight spots to PBTD. POH
Reran 6-1/16" Globe Basket worked through numerous tight spots to PBTD. POH
Made cleanout run with 6-1/8" Globe Basket worked through numerous tight spots. POH LD drill pipe.
Rig Up wireline and ran magnet to 8459'
Attempt to rerun completion. Packer stopped at 9238. No Go Set and test Packer. Wait on Orders.
Proposed forward progress:
Shear out shear sub.
Set wire line plug in tailpipe (bump down)
Determine pipe stretch for space out.
Backoff tubing.
ND BOP.
Set false bowl. Screw back in with space out pups and full joint. Land tubing in slips.
Back out landing joint make up tubing hanger and landing joint.
Pick up out of slips. Remove false bowl and land tubing.
Set TWC NU adapter flange and tree. Test.
All packer milling operation to date have been above the current packer setting depth therefore, the casing
below the packer setting depth has not seem any rotation. The Casing is new and tested to 4000 psi 6-6-97.
No further MIT testing at this time is proposed. Currently no coil unit is available on the slope that could
reach below the top of cement at 18,830'.
Permission to operation well MP F-41i as an injector for the following year is requested.
'97
0B:O6PM SHARED SERVICES DRILLIMG
State Of Alaska
AOOCC
3001 Porcupine Dr
Anchorage Ak. 99501
Blair Wonzell
B.P. Exploration
900 E Benson Blvd
Anck Ak
9-9-97 '
History of the completion of Milne Point Well F-4ii
Drilled and by Nabors 22E Jun6 of 1997.
Bumped plug with 80 bbl diesel and s~awater.
Tested casing to 4000 psi for 30 mia 6-6-9"/.
Released Rig.
Production engineering ran bond Icg (top of cement picked at 18,830'). Tho well was perforated in the
Kuparuk "A" s~ands and sot Retrievable Bridg~ Plug at 15,132'.
N'abores 4E$ move on $. 18-97.
Recovered RPB(5.986") at 15,132.
Attempted first completion wi~ 4.1/2' ~bing and B~r S.3
7[~* Packer stopp,d at 4615.
Set p~ker, Cut an~~er~ thc tubing.
Mill~ and ~ove~d ~, pa~ker,
Mad~ elo~nout mn.
~A~mpted to reran eomple~ion. Pa~ker took w~ight ~ 4408 8nd agsin at 469% POH.
M~e numerous O~JB mn on ~Iin~ ~o 9800'.
M~, cleanout ca,tag ,~ape ~d bootb~t, run to
~.b A~mptod to incomplete woll with 4-1/2" ~bing aM B~er ~3 pa~ker, Packer ~lopped at 6990.
Set p~ker cut ~d recovered ~e ~bing.
~I1 ~d ~cove~d the packer.
M~, cbmout mn with 6-1/16" Olobe Basket worked t~ou~h numerous tight spo~.
Made cle~out mn with 6-1/8" Reversing Broker worked through numerous fi~ht spots ~ 8175 unable to
go any deep~. POH.
Reran 6.1/16" Olob, Basket work~ t~ugh num~ou~ Oght spots to PB~. POH
Reran 6.1/I6" Olobe B~ket w~ed through numerous tight spots to PB~. POH
Made cleano~ mn wi~ 6-1/8" Glob~ Ba,ket worked through numerous tight spo~. POH LD ~ill pipe.
Rig Up wi~ne and ran ~agnet to 8459'
-~A~mpt ~o rerun eompl~uon. Paek~ stopp~ ~t 9238. ~~ ~o Set and test P~c~r. W~t on Orders.
Proposed forward lxogr~ss.
Shear out shc~r sub.
Set wire line plug in tailpipe (bump down)
Det,rmtn~ pipe stretch for spac~ out.
Backoff tubing.
'97
ND BOP.
8¢t false bowl. Screw bgk in with space out pups and full joint. Land tubing in slips.
Back: om landing joint make up tubing hanger and landing jolt.
Pick up out of slips. Remove false bowl and land tubing.
Set TWC NU adapter flange and tree. Test.
All pacl~r milling operation to date have been above th~ curr~nt packer setting depth lherefor~, the casing
below the paelt~r setting depth h~ not seem any rotation. The Casing is new and tested to 4000 psi 6-6-97.
No further MIT testing at this time is proposed. Currently no coil uuit is available on the slope that could
reach below the, top of cement at Ig,$30',
Permission to operation well MP F-4Ii as an injector for the following year is request~l.
WILL NEED A FRAC TREE
~ WKM 11" x 11" SM,
FMC w! 11", x 4,5" Tbg, Hnr. w/
NSCT threads tol~ and bosom, and
4' CIW HBPV profile
20" 91.1 ppf, H-40 ~ 110'
L
O3:O?PH SHREED SERVICES DRILLIHG
~,/ r'-,'l' I I
Orlg, GL '
P,3
KOP @ 800'
Max, hole angle = 76 to 78 deg, f/
4,45B~ to 17,471'
Hole angle thru' perfs = 86 deg
DL8 = 3,~2 deg,/100' @ 18,618'
9 5/S", 40#/ft, L-80 Btm. [9,304'
4.5" 12,6 ppf, L-80 NSCT tubing
(cap. = 0.0152 bpf, ;:Il'iff = 3,958")
7" 26 ppf, L-80, Mod N$OO prod, csg,
( drift ID -- 6,151", oap, - 0,0385 bpf )
none performed
Perforation Summary
I lg,4g2-19,$04'
3-3/8 66 J!19,512'19,550
',641-7,686
',663-7,6g0
DATE
6/17/g7 J B
6/17/g7
REV. BY
I I___! I I
COMMENTS
Drilled and cased by Nabors 22E
Proposed injection completion
-- 7~X 4.$" SABL-3 Baker Pkr. lag,~0''lgflb I
4'~" HE$ 'XN' npL
(v~/$.725' no-go, 3.813" PB) ~
4.5" WLEG I--._ I
7" MARKER dOINT$ [F/19,264.1e,$0~;"' ...... J
7" float collar (PBTD)
7' float shoe
WELL_F-4_1 !
· - _- .... 70
BP EXI
MEMORANDUM
TO:
David John ~St~,
Chairman ~'~
THRU: Blair Wondzell,
P. I. Supervisor
State of Alaska
Alaska Oil and Gas Conservation Commission
DATE: August 31, 1997
FILE NO: awpkh5ee.doc
FROM: Chuck Scheve, c~..~ SUBJECT:
Petroleum Inspector
BOPE Test
Nabors 4ES
MPU F-41i
PTD # 97-95
Sunday Au.qust 31, 1997: ! traveled to BPX's MPU F-41i Well and witnessed the
weekly BOPE test on Nabors Rig 4ES
As the attached AOGCC BOPE test report shows the test lasted 3 hours with no
failures.
The testing went well with good test procedures being employed by the Nabors
crews. The rig was clean and all related equipment appeared to be in good working
order. The location though crowded was well organized.
Summary: I witnessed the weekly BOPE test on Nabors Rig 4ES completing Well
MPU F-41 i '
Nabors 4ES, 8131/97, Test time 3 hours, 0 failures
Attachment: awpkh5ee.xls
X Unclassified
Confidential (Unclassified if doc. removed )
Confidential
STATE OF ALASKA
OIL AND GAS CONSERVATION COMMISSION
BOPE Test Report
OPERATION: Drlg: Workover: X
Drlg Contractor: Nabors Rig No. 4ES PTD #
Operator: BPX Rep.:
Well Name: F-41i Rig Rep.:
Casing Size: 7" Set @ 19,868 Location: Sec.
Test: Initial Weekly X Other
97-95
DATE: 8/31/97
Rig Ph.# 659-4154
Lee Hinkle
Gene Sweat
34 T. 'I3N R. fOE Meridian UM
Test
MISC. INSPECTIONS:
Location Gen.: OK Well Sign N/A
Housekeeping: OK (Gen) Drl. Rig OK
PTD On Location YES Hazard Sec. YES ·
Standing Order Posted YES ·
FLOOR SAFETY VALVES:
Upper Kelly f IBOP
Lower Kelly / IBOP
Ball Type
Inside BOP
Quan.
Pressure P/F
250/5, 000 P
250/5, 000
250/5,000
250/5, 000
P
P
BOP STACK:
Annular Preventer
Pipe Rams
Lower Pipe Rams
Blind Rams
Choke Ln. Valves
HCR Valves
Kill Line Valves
Check Valve
Quan. Test Press.
1 250/3000
25O/5, 000
~ 250/5, 000
1 250/5, 000
2 250/5, 000
I 250/5,000
N/A N/A
P/F
P
P
P
P
P
P
N/A
MUD SYSTEM: Visual Alarm
Trip Tank OK OK
Pit Level Indicators OK OK
Flow Indicator OK OK
Meth Gas Detector OK OK
H2S Gas Detector OK OK
CHOKE MANIFOLD:
No. Valves
No. Flanges 22
Manual Chokes 1
Hydraulic Chokes
·
Test
Pressure
250/5, 000
250/5, 000
Functioned
Functioned
P/F
I F/P
P
.P
P
ACCU M U LATOR SYSTEM:
System Pressure
Pressure After Closure
200 psi Attained After Closure
System Pressure Attained
Blind Switch Covers: Master:
Nitgn. Btl's:
30OO
1800
minutes 28 sec.
2 minutes 30 sec.
OK Remote: OK
4 @ 2100 Psi
Psig.
Number of Failures: 0 ,Test Time: 3.0 Hours. Number of valves tested 19 Repair or Replacement of Failed
Equipment will be made within 0 days. Notify the Inspector and follow with Written or Faxed verification to
the AOGCC Commission Office at: Fax No. 276-7542 Inspector North Slope Pager No. 659-3607 or 3687
If your call is not returned by the inspector within 12 hours please contact the P. !. Supervisor at 279-1433
REMARKS:
Distribution:
orig-Well File
c - Oper./Rig
c - Database
c - Trip Rpt File
c- Inspector
FI-021L (Rev.12/94)
STATE WITNESS REQUIRED?
YES X NO
24 HOUR NOTICE GIVEN
YES X NO
Waived By:
Witnessed By:
AWPKH5EE.XLS
Chuck Scheve
GeoQuest
500 W. International Airport Road
Anchorage, AK 99518-1199
ATTN: Sherrie
NO. 11229
Company:
Alaska Oil & Gas Cons Comm
Attn: Lori Taylor
3001 Porcupine Drive
Anchorage, AK 99501
Field:
Milne Point (Cased Hole)
Well Job # Log Description Date BL RF Sepia LIS Tape
MPF-41 ~ -'7"'7 -'7 (-..~ 97297 CET/GR (PDC) 970624
8/8/97
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO:
BP Exploration (Alaska) Inc.
Petrotectnical Data Center MB3-3
900 E. Benson Blvd.
Anchorage, Alaska 99519-6612
Date Delivered:
Schlumberger GeoQuest
500 W. International Airport Road
Anchorage, Alaska 99618-1199
Received by:~ ~~(_~(~ _~_ ~ (~~
WELL LOG TRANSMITTAL
To:
State of Alaska
Alaska Oil and Gas Conservation Comm.
Attn.: Lori Taylor
3001 Porcupine Dr.
Anchorage, Alaska 99501
MWD Formation Evaluation Logs -
MPF-41, AK-MM-70147
July 23, 1997
The technical data listed below is being submitted herewith. Please acknowledge receipt by returning a
signed copy of this transmittal letter to the attention of.'
Jim Galvin, Sperry-Sun Drilling Services, 5631 Silverado Way, ~G, Anchorage, AK 99518
1 LDWG formatted LIS Tape with verification listing.
API#: 50-029-22770-00
5631 Silverado Way, Suite G · Anchorage, Alaska 99518 · (9.07) 563-3256 · Fax (907) 563-7252
A Dresser In&Jstri¢..~
CI !::! I !--I-- I IM G S I:: ICl L~ I r" I:C S
WELL LOG TRANSNIITTAL
To: State of Alaska July 23, 1997
Alaska Oil and Gas Conservation Comm.
Attn.: Lori Taylor
3001 Porcupine Dr.
Anchorage, Alaska 99501
RE: MWD Formation Evaluation Logs - MPF-41, AK-MM-70147
The technical data listed below is being submitted herewith. Please acknowledge receipt by returning a
signed copy of this transmittal letter to the attention of~
Jim Galvin, Sperry-Sun Drilling Services, 5631 Silverado Way, #G, Anchorage, AK 99518
MPF-41:
2"x 5" MD Resistivity and Gamma Ray Logs:
50-029-22770-00
2" x 5" TVD Resistivity and Gamma Ray Logs:
50-029-22770-00
2" x 5" MD Neutron and Density Logs:
50-029-22770-00
2" x 5" TVD Neutron and Density Logs:
50-029-22770-00
1 Blueline
1 Rev. Folded Sepia
1 Blueline
1 Rev. Folded Sepia
1 Blueline
1 Rev. Folded Sepia
1 Rev. Folded Se
F-~. , ..... ~-~x ~ ~ ~ ~"~- :.?o~
5631 Silverado Way, Suite G · Anchorage, Alaska 99518 ° (9.07) 563-3256 · Fax (907) 563-7252
A Dresser Industries, Inc. Company _
STATE OF ALASKA
ALASKA ~lL AND GAS CONSERVATION COm'-MISSION
APPLICATION FOR SUNDRY APPROVAL
1. Type of Request: [] Abandon [] Suspend [] Plugging [] Time Extension [] Perforate
[] Alter Casing [] Repair Well [] Pull Tubing [] Variance [] Other
[] Change Approved Program [] Operation Shutdown [] Re-Enter Suspended Well [] Stimulate Change to Injector
2. Name of Operator
BP Exploration (Alaska)Inc.
3. Address
P.O. Box 196612, Anchorage, Alaska 99519-6612
4. Location of well at surface
1955' NSL, 2625' WEL, SEC. 6, T13N, R10E, UM
At top of productive interval
N/A
At effective depth
367' NSL, 452' EWL, SEC. 21, T14N, R10E, UM
At total depth
424' NSL, 481' EWL, SEC. 21, T14N, R10E, UM
5. Type of well:
[~ Development
E~ Exploratory
I--I Stratigraphic
[--I Service
6. Datum Elevation (DF or KB)
Plan RTE: 41.8'
7. Unit or Property Name
Milne Point Unit
8. Well Number
MPF-41
9. Permit Number
97-95
10. APl Number
50-029-22770
11. Field and Pool
Milne Point Unit / Kuparuk River
Sands
12. Present well condition summary
Total depth: measured 19893 feet
true vertical 7949 feet
Effective depth: measured 19785 feet
true vertical 7862 feet
Casing Length Size
Structural
Conductor
Surface
intermediate
Production
Liner
78' 20"
9273' 9-5/8"
19840' 7"
Plugs (measured)
Junk (measured)
Cemented
250 sx Arcticset I (Approx.)
1900 sx PF 'E', 993 sx Class 'G'
300 sx Class 'G'
MD TVD
110' 110'
9304' 4614'
19868' 7928'
Perforation depth: measured N/A
true vertical
Tubing (size, grade, and measured depth) N/A
Packers and SSSV (type and measured depth)
ORIGINAL
JUL 1 6 1997
OJ_t.& Gas Cons. C0mmiSs'
~cH0rage
13. Attachments [~ Description summary of proposal
4. Estimated date for commencing operation
July 1, 1997
16. if proposal was verbally approved
Name of approver Date approved
Contact Engineer Name/Number: James Robertson, 564-5159
Detailed operations program F-I BOP sketch
I15. Status of well classifications as:
[~ Oil [~ Gas I--I Suspended
Service
Prepared By Name/Number: Kathy Campoamor, 564-5122
17. I hereby certify that the foregoing is true and correct to the best of my knowledge
Signed ChipAlvord~,~,,~,- I~ ~,,~) Title Senior Drilling Engineer
Commission Use Only
Date
Conditions of Approval: Notify Commission so representative may witness I Approval No.~
Plug integrity ~ BOP Test ~ Location clearance__
Mechanical Integrity Test ~ Subsequent form required 10- Ho ~.
Approved by order of the Commission Origina! q'i,, Ap~_roved..__.,Copy Commissioner
' ~tU~
Form 10-403 Rev. 06/15/88 David W. Jonr, s~o,. '7
Submit In Triplicate
Date
To:
July 10, 1997
Alaska Oil & Gas Conservation Commission
eare. d
rv~ces
rilling
BP Exploration / Arco Alaska
Subject: MPF-41, Permit #97-95
I am submitting Form 10-403 requesting a change in status of MPF-41 from a
development oil well to a service well. MPF-41 is now planned to be an injector
because oil/water contact was encountered while drilling making MPF-41 unsuitable
for production.
Regards,
,~t:~,/)~/'7 ~ ~'~'
Kathy Campoamor
Technical Assistant
564-5122
GeoQuest
500 W. International Airport Road
Anchorage, AK 99518-1199
ATTN: Sherrie
NO. 11138
Company:
Field:
Alaska Oil & Gas Cons Comm
Attn: Lori Taylor
3001 Porcupine Drive
Anchorage, AK 99501
Milne Point (Cased Hole)
7/1 0/97
Well Job # Log Description Date BL RF Sepia LIS Tape
MPU C-14 TUBING PUNCH 97061 7 1 1
M PF-41 GAMMA RAY LOG 970 6 21 1 1
MPF-41 ~ CEMENT EVALUATION LOG 970624 1 1
-MPF-41¢~~(/~c GAMMA RAY/COLLAR LOG 970624 I 1
--
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO:
BP Exploration (Alaska) Inc.
Petrotectnical Data Center MB3-3
900 E. Benson Blvd.
Anchorage, Alaska 99519~6612
Date Delivered:
Schlumberger GeoQuest
500 W. International Airport Road
Anchorage, Alaska 99618-1199
Received
S,~,~e of Alaska ....
Alaska Oil & Gas Conservation Comm.
Atten' Lori Taylor
3001 Porcupine Drive
Anchorage, AK 99501
Transmittal of Final Prints. Please sign and return copy to:
Western Altas Logging Services
Pouch 340013
Prudhoe Bay, AK 99734-0013
02-Jul-97
Well Name
Services
MPF-41 GR/CCL PERF 1
Bluelines R/F Sepia
1
Film
o,!
-Recei~'~d by: (~ -
jUL 0 7 ',997
.Z~ch0r~e
Contact Rebecca Lange if you have a question concerning this transmittal
at (907) 659-2816 or Fax (907) 659-2602. _
TONY KNOWLE$, GOVERNOR
ALASi~& OIL AND GAS
CONSERVATION COMMISSION
3001 PORCUPINE DRIVE
ANCHORAGE, ALASKA 99501-3192
PHONE: (907) 279-1433
FAX: (907) 276-7542
May 21, 1997
Tim Schofield
Senior Drilling Engineer
BP Exploration (Alaska) Inc.
P O Box 196612
Anchorage, AK 99519-6612
Milne Point Unit MPF-41
BP Exploration (Alaska) Inc.
Permit No. 97-95
Sur. Loc. 1954'NSL, 2625'WEL, Sec. 06, T13N, R10E, UM
'Btmnhole Loc. 338'NSL, 4786'WEL, Sec. 21, T14N, R10E, UM
Dear Mr. Schofield:
Enclosed is the approved application for permit to drill the above referenced well.
The permit to drill does not exempt you from obtaining additional permits required bv law from
other governmental agencies, and does not authorize conducting drilling operations until all other
required permitting determinations are made. Your request for a waiver of the diverter system
identified in 20 AAC 25.035(7)(b) has been approved.
Blowout prevention equipment (BOPE) must be tested in accordance with 20 AAC 25 035.
Sufficient notice (approximately 24 hours) must be given to allow a representative of the
Commission to wimess a test of BOPE installed prior to drilling nexv hole. Notice may be given
by contacting the Commission petroleum field inspector on the North Slope pager at 659-3607.
David W.
Chairman
BY ORDER OF THE COMMISSION
dlf/Enciosures
CC:
Department of Fish & Game, Habitat Section w/o encl.
Department of Environmental Conservation w/o encl.
STATE OF ALASKA
ALA'b, ~A OIL AND GAS CONSERVATION '~-- MMISSION
PERMIT TO DRILL
20 AAC 25.005
11a. Type of work [] Drill [] Redrill Jlb. Type of well [] Exploratory [-I Stratigraphic Test [] Development Oil!
[] Re-Entry I--I DeepenI [] Service I-I Development Gas ['q Single Zone I--I Multiple Zone
2. Name of Operator 5. Datum Elevation (DF or KB) 10. Field and Pool
BP Exploration (Alaska) Inc. Plan RTE = 41.8' Milne Point Unit / Kuparuk River
3. Address 6. Property Designation Sands
P.O. Box 196612, Anchorage, Alaska 99519-6612 ADL 355016
4. Location of well at surface 7. Unit or Property Name 11. Type Bond (See 20 AAC 25.025)
1954' NSL, 2625' WEL, SEC. 6, T13N, R10E Milne Point Unit
At top of productive interval 8. Well Number Number 2S100302630-277
106' NSL, 4922' WEL, SEC. 21, T14N, R10E MPF-41
At total depth 9. Approximate spud date Amount $200,000.00
338' NSL, 4786' WEL, SEC. 21, T14N, R10E 05/20/97
12. Distance to nearest property line113. Distance to nearest well 14. Number of acres in property 15. Proposed depth (MD and TVD)
ADL 355017, 338'I No Close Approach 5071 19730' MD / 7781' TVD
16. To be completed for deviated wells 17. Anticipated pressure {see 20 AAC 25.035 (e) (2)}
Kick Off Depth 300' Maximum Hole Angle 76.52° Maximum surface 3333 psig, At total depth (TVD) 7240' / 3704 psig
i18. Casing Program Setting Depth
Size Specifications Top Bottom Quantity of Cement
Hole Casing Weight Grade Coupling Length MD TVD MD TVD (include stage data)
24" 20" 91.1# H-40 Weld 80' 32' 32' 112' 112' 250 sx Arcticset I (Approx.)
12-1/4" 9-5/8" 40# L-80 Btrc 9032' 31' 31' 9063' 4476' 1711 sx PF 'E', 934 sx 'G'
8-1/2" 7" 26# L-80 Btrc-Mod 19700' 30' 30' 19730' 7781' 228 sx Class 'G'
19. To be completed for Redrill, Re-entry, and Deepen Operations.
Present well condition summary
Total depth: measured feet Plugs (measured)
true vertical feet
Effective depth: measured feet Junk (measured)
true vertical feet
Casing Length Size Cemented MD TVD
Structural
Conductor
Surface tl ;:, ? ....
Intermediate
I, ~: ~'., %,/ "'"
Production '~,~'~? ' ' '
Liner
f ,',-:: -L 't .,'. ~ '.: '
Perforation depth: measured
true vertical
20. Attachments [] Filing Fee [] Property Plat [] BOP Sketch [] Diverter Sketch [] Drilling Program
[] Drilling Fluid Program [] Time vs Depth Pict [] Refraction Analysis [] Seabed Report [] 20 AAC 25.050 Requirements
Contact Engineer Name/Number: James Robertson, 564-5159 Prepared By Name/Number: Kathy Carnpoamor, 564-5122
21. I hereby certify that the fore~qoing is. tru~ and ,c.o/rlcct to the best of my knowledge
Tim Schofield - C- Title Senior Drilling Engineer Date %' 7,
Commission Use Only
Permit Number I APl Number Approval Date .., I See cover letter
?,/7- /~..~, 50- O.Z. ? -' ~ 2-. ~ '~' ~ ~.~- c~. /'- ./~ ~I for other requirements
Conditions of Approval' Samples Required []Yes [~ No Mud Log Required []Yes [~ No
Hydrogen Sulfide Measures [~Yes []No Directional Survey Required J~Yes [] No
Required Working Pressure for BOPE []2M; [] 3M; J~ 5M; [] 1OM; l-115M
Other:
Original Signed By by order of
Approved By
Form 10-401 Rev. 12-01-85
7
Submit In Triplicate
Shared Services Drilling Contact:
I Well Name:
James E. Robertson
IMP F-41 I
Well Plan Summary
564-5159
IType of Well (producer or injector):
KUPARUK
PRODUCER
Surface Location: 1954 NSL 2625 WEL Sec 06 T13N R10E UM., AK
Target Location: 106 NSL 4922 WEL Sec 21 T14N R10E UM., AK
Bottom Hole Location: 338 NSL 4786 WEL Sec 21 T14N R10E UM., AK
I AFE Number: 1337073
I Estimated Start Date: 1 20MAY97 I
IUD: 1,9,730' I ITVD:
IWell Design:
Rig: I Nabors 22-E
Operating days to complete:
123
I KBE: 141.8'
IMilne Point Ultra Slimhole Longstring 9-5/8", 40# Surface X 7", 26#
Longstring
Formation Markers:
Formation Tops MD TVD (bkb)
base permafrost 1812 1791
NA 6940 3981 Top of Schrader Bluff Sands (8.3 ppg)
Seabee Shale 8913 4441 Base of Schrader Bluff Sands (8.3 ppg)
HRZ 18842 7101 High Resistivity Zone
MK-19 18920 7161
Top Kuparuk 19064 7271 Kuparuk Cap Rock
Target Sand -Target 19312 7461 Target Sand (9.6 ppg)
Total Depth 19730 7781
Casins/Tub ;n~ Program:
-~r .~, y
Hole Size Csg/ Wt/Ft Grade Conn Length Top Btm
Tbs O.D. MD/'rVD MD/TVD
24" 20" 91.1 # H-40 Weld 80 32/32 112/112
12 1/4" 9-5/8" 40# L-80 btrc 9032 31/31 9063/4476
8-1/2" 7" 26# L-80 btrc- 19700 30/30 19730/7781
mod
Internal yield pressure of the 7" 26# casing is 7240 psi. Worst case surface pressure would occur with a full
column of gas to the reservoir at +7420 TVDSS. Maximum anticipated surface pressure in this case assuming a
reservoir pressure of 3704 psi (9.6 ppg EMW) is 3333 psi, well below the internal yield pressure rating of the 7"
casing.
Logging Program:
Open Hole Loss:
Surface
Intermediate
Final
Cased Hole Loss:
MWD Directional AND gamma ray surface to TD.
N/A
MWD Directional and LWD Triple Combo(GR/RES, Density, Neutron) from
drillout of shoe to TD
N/A
Mudloggers are NOT required for this well.
Mud Program:
I Special design considerations I None-SPUD MUD I
Surface Mud Properties: J
Density Marsh Yield 10 sec l0 min pH Fluid
(PPG) Viscosity Point gel gel Loss
8.6 50 15 8 10 9 8
to to to to to to to
9.6 150 35 15 30 10 15
Intermediate Mud Properties: N/A I
Density Marsh Yield 10 sec 10 min pH Fluid
(PPG) Viscosity Point gel gel Loss
ProdUction Mud properties: I LSND freshwater mud
Density Marsh Yield 10 sec 10 min pH Fluid
(PPG) Viscosity Point gel gel Loss
8.6 35 6 3 7 8.5 6-12
to to to to to to to
10.0 50 20 10 20 9.5 4-6
Well Control:
Shared Services Drilling requests a waiver of the diverter system identified in 20 AAC 25.035 (7)(b)
"Secondary Well Control: Blowout Prevention Equipment (BOPE) Requirements" based upon historical
drilling experience on 'F' Pad in the Milne Point Unit.
To date, there have been 37+ wells drilled on Milne Point 'F' Pad. None of these wells experienced any
difficulty with shallow gas in the interval prior to placement of surface casing to depths not exceeding 5000'
TVD Sub Sea.
In light of the historical evidence indicating virtually no risk due to shallow gas at Milne Pt. 'F' Pad within the ] ,./~
above mentioned interval, it is requested that MP F-41 surface hole be drilled without the installation of theli"~
diverter system. A 20" riser will be installed to act as a conduit to facilitate drilling mud flow.
Well control equipment consisting of 5000 psi W.P. pipe rams, blind rams, and annular preventer will be installed
after setting surface casing and is capable of handling maximum potential surface pressures.
BOPE and drilling fluid system schematics on file with AOGCC.
Directional:
I KOP: 1300'
IMaximum Hole Angle:
Close Approach Well:
76.52
NONE
Disposal:
Cuffings Handling: Cuttings and drilling waste fluids should be hauled to the ball mill at CC-2A or injected down
an APPROVED ANNULUS. The Milne Point reserve pit can be opened in emergencies by notifying Karen
Thomas (564-4305) with request. If the approaches the the Kuparuk River Bddge go out while MP F-41 is being
drilled cuttings are to be hauled to Milne Pt. %' Pad pit for temporary storage.
.
2.
3.
4.
5.
.
.
11.
12.
13.
14.
15.
16.
MP F-4'I
Proposed Summary of Operations
Drill and Set 20" Conductor. Weld a starting head on conductor.
Prepare location for rig move.
MIRU Nabors 22E drilling rig.
NU 20" riser. Build Spud Mud.
Drill a 12-1/4" surface hole as per directional plan. Run Directional MWD AND gamma ray from surface
to TD.
Run and cement 9-5/8" casing.
ND riser. NU and test 13-5/8" BOP.
MU a PDC bit on a motor, with Directional MWD and LWD Tdple Combo (GR/RES/Dens/Neu). RIH,
Drill out Float Equipment and 20' of new formation. Perform LEAKOFF TEST. If LOT EMW is less than
12.5 ppg contact appropriate superintendent.
Drill 8.5" hole to TD as per directional plan. POOH to run 7" casing.
Run and Cement 7", 26#, L-80, Buttress-Modified casing. Displace cement with completion fluid and
enough diesel to cover from the base of permafrost to surface.
Test casing to 3000 psig for 30 min.
ND BOPE, NU and Test Tree. RDMO Nabors 22E drilling rig to drill next well.
Run Cement Bond Log into MP F-41
MIRU completion rig. NU & Test BOPE to 5000 psig.
Complete well with 2-7/8" tubing.
Install Surface Lines and Wellhouse and turn well over to production.
DRILLING HAZARDS AND RISKS:
Seethe updated Milne Point F-Pad Data Sheet prepared by Pete Van Dusen for information on F pad and
review recent wells drilled on F Pad. Most of the trouble time on recent wells has been due to equipment
mechanical problems with the surface equipment, rather than formation drilling problems.
The MPU PE group MAY be perforating, hydraulic fracturing and cleaning out wells shortly after the dg ddlls
and completes them. This will make the near rig area congested and as a result potentially hazardous.
Ensure personnel use caution moving around adjacent production activities.
Close Approach:
There are no close approaches associated with the drilling of MP F-41.
Lost Circulation:
There has not been any appreciable amount of lost circulation on any of the F Pad wellls to date.
Stuck Pipe Potential:
Well MPF-53 was stuck coming out on the short trip at surface casing point. Proir to this incident there was
only minor indications that the gravel and coal were present. It appears that we dragged the gravel up into
the bottom of the curve and reduced our ability to move up or down. Then we lost the ability to circulate
when the hole collapsed.
If significant gravels are encountered stop and raise funnel viscosity to 150 cp viscosity immediately.
Formation Pressure:
The maximum expected pore pressure for this well is 9.6 ppg EMW (3,704 psi @ 7,420' TVDss). There has been
no injection in this region, therefore the reservoir pressure should not exceed this estimate and it is likely the
area is somewhat depleted.
MP F-41
9-$/8" SURFACE CASING
CEMENT PROGRAM - HALLIBURTON
CASING SIZE: 9-5/8" CIRC. TEMP 60 deg F at 2840' TVDSS.
SPACER: 75 bbls water.
STAGE1 LEAD:
ADDITIVES:
WEIGHT:
APPROX #SACKS:
TYPE 'E' PERMAFROST
Retarder + CELLO-FLAKES (1/4 lb/sack)
12.0 ppg YIELD:2.17 ft3/sx MIX WATER: 11.63 gal/sk
846 SACKS THICKENING TIME: Greater than 4 hfs at 50° F.
ANUULAR VOLUME TOP OF TAIL CEMENT TO ES CEMENTER
_+200' MD BELOW BASE OF PERMAFROST (2000' MD) +30%
EXCESS.
STAGE1 TAIL CEMENT TYPE:
PREMIUM 'G'
ADDITIVES:
WEIGHT:
APPROX #SACKS:
FLUID LOSS:
0.2% CFR-3 + 0.20% HALAD-344 + CELLO-FLAKES
15.8 ppg YIELD:l.15 ft3/sx MIX WATER: 5.0 gal/sk
934 THICKENING TIME: Greater than 4 hrs at 50° F.
100-150 cc FREE WATER: 0
ANNULAR VOLUME FROM TD TO 100 FEET TVD ABOVE TOP of
Schrader Bluff + 30% EXCESS + 80'md 9-5/8", 40# capacity for float
joints.
STAGE2 LEAD:
ADDITIVES:
WEIGHT:
APPROX #SACKS:
TYPE 'E' PERMAFROST
Retarder
12.0 ppg
865 SACKS
YIELD:2.17 ft3/sx MIX WATER: 11.63 gal/sk
THICKENING TIME: Greater than 4 hrs at 50° F.
ANUULAR VOLUME ES CEMENTER AT 200' MD (2000' MD) BELOW
BASE OF PERMAFROST TO SURFACE+ 200% EXCESS.
WELLHEAD STABILITY CEMENT TYPE: Permafrost E
NOTE:
ADDITIVES: Retarder
WELLHEAD STABILITY CEMENT WILL BE PUMPED IF THERE ARE NO
CEMENT RETURNS TO SURFACE OR THE CEMENT TOP FALLS BELOW
SURFACE AFTER THE PUMPS ARE SHUT DOWN.
WEIGHT: 12.0 ppg
YIELD:2.17 ft3/sx
MIX WATER: 11.63 gal/sk
APPROX NO SACKS: 150
RECIPROCATE CASING STRING WHILE CEMENTING IF POSSIBLE/PRACTICAL
CENTRALIZER PLACEMENT:
1. 1 Bowspring centralizer per joint of 9-5/8" casing on bottom 15 joints of casing ('i5 required).
2. Place all centralizers in middle of joints using stop collars.
OTHER CONSIDERATIONS: Perform lab tests on mixed cement/spacedmud program and ensure
compatibility prior to pumping job. Ensure thickening times are adequate relative to pumping job
requirement. Displace at 12 - 15 bpm. Mix slurry on the fly -- batch mixing is not necessary.
MP F-41 Well
7" PRODUCTION CASING
CEMENT PROGRAM- HALLIBURTON
SINGLE STAGE CEMENT JOB ACROSS THE KUPARUK INTERVAL:
CIRC. TEMP: 140° F BHST 170° F at 7040' TVDSS.
SPACER:
20 bbls fresh water
70 bbls Alpha Spacer mixed as per Halliburton specifications weighted to 1.0 ppg above current
mud weight.
CEMENT TYPE: Premium G
ADDITIVES:
WEIGHT: 15.8ppg
APPROX # SACKS:
FLUID LOSS:
0.2% CFR-3, 0.1% HR-5, 0.4% Halad 344
YIELD: 1.15 cu ft/sk MIX WATER: 5.0 gal/sk
228 SACKS
THICKENING TIME: 3 1/2 - 4 1/2 hrs @ 140° F
< 50cc/30 min @ 140° FREE WATER: 0cc @ 45 degree angle.
CENTRALIZER PLACEMENT:
,
7" x 8-1/4" Straight Blade Rigid Centralizers. Two per joint on the bottom 19 joints of 7" casing (38).
This will cover +300' above the KUPARUK Sand.
Run two (2) 7"x 8-1/4" Straight Blade Rigid Centralizers on the second full joint inside the 9-5/8" casing
shoe.
OTHER CONSIDERATIONS:
Perform lab tests on mixed cement/spacer/mud program and ensure compatibility prior to pumping job.
Ensure thickening times are adequate relative to pumping job requirement. Displace at 8-'10 bpm.
Batch mixing is not necessary.
CEMENT VOLUME:
.
Single stage cement job is calculated to cover 1000 FT MD above the Kuparuk 'C' Sand with
30% excess.
SHARED
SERVTCES
DRTLLTN6
·
ANADRILL ' .AKA'DPC
FEASIB'I LITY PLAN"
NOT APPROVED FOR
EXECUTION "
PLAN I~ '-'"'
i i ii ii i i
/nadri ]] $chJumber#~r
, III III I I I
i i i i iiiii ·
· (P 11),....
VERTICAL, .SECTION.,':,!:VIEW
Sectio a 30.1,8
TVO,Scale.' ~ inch = 2000 feet....
Dep Scale.' '~ inch = 2000. feet
Drawn · '~4 May ~997 '
- - A .... Marker, Identification MD BKB SECTN INC
A) KB 0 0 0 O.
@ -- B) KOP/BUILD 1/100 600 600 0 O.
-.-----I~ .... C) BUILD 1.5/100 700 700.:.:
. ' ' 0) BUILD'2/IO0 ,. 900 900, B 4.
E ~ E) CURVE 2/t00 1200 1t97"" 37 10.'
.... ~ ~A~rP~h~?'~ F) END 2/100 CURVE · 1783 1763 169 18.,
- , . G) BUILD 2.5/100 1843 , 1820, . 187 18.,
H) END 2.5/J00 BUILD 4182 3339.,,'1832 76.~
I) 9-5/8" CASI,N$,POINT. 9064 4477 '6580 76.1
J) DROP 3/100 .... ", 1.7825',6472 .'14906 76.1
K) ENO 3/100 DROP, '18843 7102 15923 40.~
. L) TARGET , 19313 7462;16226 40.~
': " M) 7'CASING POINT 19730" 7782"16494 40.1
~~~-- N) TD ::' 19730 7782'16494 40.1
NA J~U~' . '
~ ~ ...............
, , .
! ! ......... i ! i -- ! I . I I -- -- ! i -- -- ! ii -- i -- -- . I -- I I . ! ! i I -- I i -- . -- I I i -- ! ! . I ! . --
i ii; ;;ii i;i;; ; i;iii;ii ii ii i iiiiiiii iiiiiii ii ii' ~ii ii~ iiiiiiiiiiii iiiii _.
F M
I_
.
·
,
:
O0
o0
O0
O0
GET (R~
10000
0 1000 2000 3000 4000 5000 6000 7000 B000 9000 10000 11000 12000 13000 14000 15000 ~6000 17000
Sect ion Departure
i
naOr]]] (c}97 MPF41P11 3,0C 7:50 AM P}
]us 200
' SHAREB SERVTCES
ii i i ·
ii
DRILLZNG
~ I IVil-'F --Lt 1 ~i-' 1 1 ~
VERTICAL SECTION VIEW
Section 8t:: 30.~8
iT¥[) Scale.: ~ inch = ~00 feet
_~ Oep Scale · 1 inch = ~00 feet
.'/r'._~--''--_ . "' ...... ...... ' ......... ¢~'TF~'-'r'°"2-r,~ Ora~n ' 14 Hay 1997
! i
~--,~ - r,~', .4nadr.i.l ] $ch ] umborgsr
~ I
, ~ Marker Identification HO BKB SECTN INCLN
A) END 3/100 DROP 18843 7102 15923 40.00
B) TARGET 19313 7462 16226 40.00
C) 7" CASING POINT 19730 7782 16494 40.00
--- D) TD 19730 7782 16494 40.00
'T~ -/'b/'2 .......... '~-- .........
, , ,
,
'.~ '
TA I T (RB[ j 200 et
-T~A~ - r4/l...........
'T~' - FS¢ .......... ~'- ..... q.....
..%
,
\i
A NADR
LL
A~ :A-DPt, ' ~
'.\
qOT.,,~,~,APF~RO~,E.D,_. ~. . :OR' :': ~:' '-:
:A~k'U i IUIN
_.,,,,P~.~ :~ //,~ ~ .. .
.
.
. .
~5900 ~5950 J6000 ~6050 16J00 16150 16200 J6250 ~6300 i6350 ~6400 16450 J6500 16550 16600
Section Departure
knadri]] (C)97 14PF4IPll 3.0C 7:51 AN P)
:¢I
SHARED
NarkeP ~dent~ficat~on ND N/S
~1 Kop/~u~o ~/~oo ~oo o.
C) BUILD 1.5/]00 700 0 N ! E
D) BUILD 2/~00 900 4 N
E) CURVE 2/]00 1200 lB N 42 E
F) END 2/SO0 CURVE ~783 ~6 N ]36 E
6) BUILO 2.5/~00 ~843 ~32 N ~45 E
H) END 2.5/]00 BUILD 4]82 1554 N 972 E
I) 9-5/8" CASING POINT 9064 5658 N 335g E
d) DROP 3/~00 ~7625 12855 N 7545 E
KI ENO 3/~00 OROP 18843 13735 N 8057 E
L) TARGET 193t3 13996 N 8209 E
N) 7" CASING POINT ~9730 ~4228 N 8344 E
N) TD ~9730 ~4228 N 8344 E
'SERVTCES
_!
E/~
DRTLLTNG
,
PF-4'I (PI'I)
PLAN VIE~
CLOSURE ..... : 16494 feet at Azimuth 30.39
DECLINATION.: +28.024 (El
SCALE .......: 1 inch : 2200 feet
DRAWN .......: ~4 May ~997
AnadrY]] $£h]umberger
A NADR: LL" AKA-DPC J
~OT AP['RO~'ED i:OR
~I~ ql I? Ak I l
-.
, ,, , '. :. .;.:.- .. .. ~-: .. .- ,.
"-:--' .: .'.'.~7" ., . , ~' -.::,; '
.
.; .
.
...: : ,
,.
0 ~00 2200 3300 4400 '~500 ~6~0 '~?~ ~*~0 ~00 t1000 '~00 ~3200 J4300
<- WEST · EAST ->
Anadri]! (c)g7 14PF41P~I 3.0C 7:52 AM P]
· 78 · 77
· 74. · 7,.3
· 70 · 69
· 66 · 65
· 62 · 61
· 58 · 57
· 54- · 5,3
· 50 · 4-9
· 4-8 · 4-5
· 4.2 "~ F-41
· 38 · 37
· 33
· 30 · 29
F-26 + ·25
· 22 · 21
m18 (,,.
· 14 I 13 ",
rolO ~
· 2 · 1
LEGEND
-~- AS-BUILT CONDUCTOR
· EXISTING CONDUCTOR
VICINITY MAP
N.T.S.
NOTES
1. DATE OF SURVEY: APRIL 2.3, 1997.
2. REFERENCE FIELD BOOK:
MP97-04. (pg. 13-15).
.3. ALASKA STATE PLANE COOR01NATES
ARE ZONE 4-, NAD 27.
4.. GEODETIC COORDINATES ARE NAD 1927.
5. PAD SCALE FACTOR IS 0.99990199.
6. HORIZONTAL/VERTICAL CONTROL IS BASED
ON MONUMENTS F-! SOUTH AND F-2
NORTH.
SURVEYOR'S CERTIFICATE
I HEREBY CERTIFY THAT I AM
PROPERLY REGISTERED AND LICENSED
TO PRACTICE LAND SURVEYING IN
THE STATE OF ALASKA AND THAT
THIS PLAT REPRESENTS A SURVEY
MADE BY ME OR UNDER MY DIRECT
SUPERVISION AND THAT ALL
DIMENSIONS AND OTHER DETAILS ARE
CORRECT AS OF APRIL 23, 1997.
OCATED WITHIN PROTRACTED SEC. 06. T. 1.3 N. R. 10 E., UMIAT MERIDIAN, ALASKA
LU~J~ ILI../ viiIl Ill~l i i,~ il,, ,v .~ ....... ! ....... i
WELL A.S.P. PLANT GEODETIC GEOD~[TIC GROUND SECTION
NO. COORDINATES COORDINATES POSITION(DMS) POSITION(D.DD) ELEVATION OFFSETS
y=6,035,372.88 N=10,180.07 70'30'27.207" 70.5075575' 12.2' 1,921' FSL
!F-26 X= 54-1,779.20 E= 5,000..37 149'39'29.436" 149.6581767' 2,785' FEL
' y=6,035,407.36 N=10,300.02 70'30'27.537" 70.5076492' 12.3' 1,955' FSL
F-41 X= 54-1,937.98 E= 5,110.00 14-9'39'24.753" 149.6568758' 2,625' FEL
~ STOLL
CHECKEO: ALLISON
OAn~: 4/23/97
ORAWNr,: MPUFAB
JOB NO:
SCALE:
EXPLORATION
i'EE'i OF 1
MILNE POINT UNIT F-PAD
AS-BUILT WELL CONDUCTORS
WELLS F-26 & F-41
WELL PERMIT CHECKLISTco
cLAss f-o,'1 GEoL
PROGRAM: expD dev~redrlD servfq wellbore segD ann disp para req~
~' ?'d'~ UNIT" l/~..g ON/OFF SHORE ~ ~
ADMINISTRATION
1. Permit fee attached ................... /x
2. Lease number appropriate ................ Ivl~
3. Unique well name and number ............... I~
4. Well located in a defined pool ............. ~Y
5. Well located proper distance from drlg unit boundary. ' Il
6. Well located proper distance from other wells ...... I!
7. Sufficient acreage available in drilling unit ...... I!
8. If deviated, is wellbore plat included ......... I~
9. Operator only affected party .............. ~
10. Operator has appropriate bond in force ......... ~
11. Permit can be issued without conservation order .... 'l ~
12. Permit can be issued without administrative approval. ./~
13. Can permit be approved before 15-day wait ....... ~
REMARKS
ENGINEERING
14. Conductor string provided ............... ~ N
15. Surface casing p~otects all known USDWs ........ ~y~ N
16. CMT vol adequate to circulate on conductor & surf csg. .
17. CMT vol adequate to tie-in long string to surf csg . .
18. CMT will cover all known productive horizons ...... ~ N
19. Casing designs adequate for C, T, B & permafrost .... ~ N
20. Adequate tankage or reserve pit ............ N
21. If a re-drill, has a 10-403 for abndnmnt been approved.
22. Adequate wellbore separation proposed ......... .~ N
23. If diverter required, is it adequate .......... ~ N
24. Drilling fluid program schematic & equip list adequate .~ N
25. BOPEs adequate ............. ~ ....... ~ N
BOPE press rating adequate; test to ~3-~ psig.t3~' N
27.26. Choke manifold complies w/API RP-53 (May 84) ......
28. Work will occur without operation shutdown ....... ~v_~ N
29. Is presence of H2S gas probable ............ ~ N
GEOLOGY
30. Permit can be issued w/o hydrogen sulfide measures .... Y
31. Data presented on potential overpressure zones ..... /Y
32. Seismic analysis of shallow gas zones .......... X~ /I /~/~/ ~
33. Seabed condition survey (if off-shore) ........
34. Contact name/phone for weekly progress reports . . . /. Y N
[exploratory only]
GEOLOGY: ENGINEERING: COMMISSION: Comments/Instructions:
HOW/dlf- A:\FORMS\cheklist rev 01/97
Well History File
APPENDIX
Information of detailed nature that is not
particularly germane to the Well Permitting Process
but is part of the history file.
To improve the readability of the Well History file and to
simplify finding information, information of this
nature is accumulated at the end of the file under APPENDIX.
No special effort has been made to chronologically
organize this category of information.
* ALASKA COMPUTING CENTER
.
******************************
. ............................
* ....... SCHLUMBERGER .......
. ............................
******************************
COMPANY NAME : BP EXPLORATION (ALASKA)
WELL NAME : MPF-41
FIELD NAME : MILNE POINT
BOROUGH : NORTH SLOPE
STATE : ALASKA
API NUM~ER : 500292277000
REFERENCE NO : 97297
AUG 12 1997
Alaska Oil & Gas Cons. Commission
Anchorage
LI~ Tape V~rification Listing
Schlumberger Alaska Computing Center
8-AUG-1997 07:43
PAGE:
**** REEL HEADER ****
SERVICE NAME : EDIT
DATE : 97/08/ 8
ORIGIN · FLIC
REEL NAME : 97297
CONTINUATION # :
PREVIOUS REEL :
COf~V~JTT · BP EXPLORATION, MILNE POINT, MPF-41, API #50-029-22770-00
**** TAPE HEADER ****
SERVICE NAM~ : EDIT
DATE : 97/08/ 8
ORIGIN : FLIC
TAPE NAME · 97297
CONTINUATION # : 1
PREVIOUS TAPE :
COMPIENT : BP EXPLORATION, MILNE POINT, MPF-41, API #50-029-22770-00
TAPE HEADER
MILNE POINT
CASED HOLE WIRELINE LOGS
WELL NA~E: MPF-41
API NUMBER: 500292277000
OPERATOR: BP EXPLORATION (ALASKA)
LOGGING COMPANY: SCHLUMBERGER WELL SERVICES
TAPE CREATION DATE: 8-AUG-97
JOB NUMBER: 97297
LOGGING ENGINEER: PAWLUK
OPERATOR WITNESS: WHIPP
SURFACE LOCATION
SECTION: 6
TOWNSHIP: 13N
RANGE: 10E
FNL:
FSL: 1954
FEL: 2626
FWL:
ELEVATION (FT FROM MSL O)
KELLY BUSHING: 41.30
DERRICK FLOOR: 41.30
GROUND LEVEL: 12.30
WELL CASING RECORD
OPEN HOLE CASING DRILLERS CASING
BIT SIZE (IN) SIZE (IN) DEPTH (FT) WEIGHT (LB/FT)
1ST STRING 8. 500 7. 000 19868.0 26. O0
2ND STRING
3RD STRING
PRODUCTION STRING
CURVE SHIFT DATA - ALL PASSES TO STANDARD (MEASURED DEPTH)
LI~ Tape V~rification Listing
Schlumberger Alaska Computing Center
8-AUG-1997 07:43
BASELINE CURVE FOR SHIFTS
LDWG TOOL CODE:
LDWG CURVE CODE:
RUN NUMBER:
PASS NUMBER:
DATE LOGGED:
LOGGING COMPANY:
BASELINE DEPTH
$
.......... EQUIVALENT UNSHIFTED DEPTH ..........
GRCH
.......
THIS TAPE CONTAINS THE CASED HOLE LDWG EDIT FOR BP
EXPLORATION WELL MPF-41. THE GAM~A RAY FROM THE CE~IENT
EVALUATION TOOL MAIN PASS, DATED 24-JUN-97, IS THE
PRIMARY DEPTH CONTROL FOR THIS WELL.
$
$
PAGE:
**** FILE HEADER ****
FILE NAME : EDIT .001
SERVICE : FLIC
VERSION · O01CO1
DATE : 97/08/ 8
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
FILE HEADER
FILENUMBER: 1
EDITED CURVES
Depth shifted and clipped curves for each pass in separate files.
PAss NUMBER: 1
DEPTH INCREMENT: 0.5000
FILE SUMMARY
LDWG TOOL CODE START DEPTH STOP DEPTH
CET 19749.5 18250.5
$
CURVE SHIFT DATA - PASS TO PASS (f~EASURED DEPTH) BASELINE CURVE FOR SHIFTS
LDWG CURVE CODE: NONE
PASS NUM~ER:
BASELINE DEPTH
$
.......... EQUIVALENT UNSHIFTED DEPTH ..........
GRCH
.......
REM_ARKS: THIS FILE CONTAINS THE CLIPPED AND EDITED MAIN PASS FOR
LIS Tape V$rification Listing
Schlumberger Alaska Computing Center
8-AUG-1997 07:43
PAGE:
THE PRIMARY DEPTH CONTROL GAMMA RAY.
$
LIS FORMAT DATA
** DATA FORMAT SPECIFICATION RECORD **
** SET TYPE - 64EB **
TYPE REPR CODE VALUE
1 66 0
2 66 0
3 73 16
4 66 1
5 66
6 73
7 65
8 68 0.5
9 65 FT
11 66 64
12 68
13 66 0
14 65 FT
15 66 68
16 66 1
0 66 0
** SET TYPE - CHAN **
NAM~ SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEbl CODE (HEX)
DEPT FT 572358 O0 000 O0 0 1 1 1 4 68 0000000000
GRCH CNTD GAPI 572358 O0 000 O0 0 1 1 1 4 68 0000000000
TENS CNTD LB 572358 O0 000 O0 0 1 1 1 4 68 0000000000
CCL CNTD V 572358 O0 000 O0 0 1 1 1 4 68 0000000000
** DATA **
DEPT. 19749.500 GRCH. CNTD 38.182 TENS.CNTD 1777.000 CCL.CNTD
DEPT. 18250.500 GRCH. CNTD 64.023 TENS. CNTD 3768.000 CCL.CNTD
-0.262
-999.250
** END OF DATA **
LIS Tape VErification Listing
Schlumberger Alaska Computing Center
8-AUG-1997 07:43
PAGE:
**** FILE TRAILER ****
FILE NAME : EDIT .001
SERVICE : FLIC
VERSION : O01CO1
DATE : 97/08/ 8
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
**** FILE HEADER ****
FILE NAME : EDIT .002
SERVICE : FLIC
VERSION : O01CO1
DATE : 97/08/ 8
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
FILE HEADER
FILE AUj!ViBER 2
RAW CURVES
Curves and log header data for each pass in separate files; raw background pass in last file
PASS--ER: 1
DEPTH INCREMENT: 0.5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH STOP DEPTH
19749.5 18250.5
CET
$
LOG HEADER DATA
DATE LOGGED: 24-JUL-97
SOFTWARE VERSION: 8C0 - 609
TI~E LOGGER ON BOTTOM: 1600 24-JUL-97
TD DRILLER (FT) : 19750.0
TD LOGGER (FT) : 19750.0
TOP LOG INTERVAL (FT) : 18300.0
BOTTOM LOG INTERVAL (FT) : 19730.0
LOGGING SPEED (FPHR): 2400.0
DEPTH CONTROL USED (YES/NO): YES
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE TOOL NUMBER
....................................
CET GAM~A RAY SAH- E
CET GAM~A RAY SGT-L
CET CEMENT EVALUATION CEEC- C
$
BOREHOLE AND CASING DATA
LIS Tape V~rification Listing
Schlumberger Alaska Computing Center
8-AUG-1997 07:43
PAGE:
OPEN HOLE BIT SIZE (IN)
DRILLERS CASING DEPTH (FT)
LOGGERS CASING DEPTH (FT)
8.500
19868.0
BOREHOLE CONDITIONS
FLUID TYPE:
FLUID DENSITY (LB/G):
SURFACE TEMPERATURE (DEGF) :
BOTTOM HOLE TEMPERATURE (DEGF) :
FLUID SALINITY (PPM) :
FLUID LEVEL (FT) :
FLUID RATE AT WELLHEAD (BPM):
WATER CUTS (PCT) :
GAS~OIL RATIO:
CHOKE (DEG) :
BRINE
NEUTRON TOOL
TOOL TYPE (EPITHERMAL OR THERMAL)
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE
TOP NORMALIZING WINDOW (FT) :
BASE NORMALIZING WINDOW (FT) :
BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER
FAR COUNT RATE LOW SCALE (CPS):
FAR COUNT RATE HIGH SCALE (CPS):
NF~AR COUNT RATE LOW SCALE (CPS):
NEAR COUNT RATE HIGH SCALE (CPS):
TOOL STANDOFF (IN):
REMAPJfS: TIED INTO GR RUN WITH GYRO DATED 6/21/97
CEMENT TOP APPEARS AT 18500.
GR/CCL LOGGED TO 9000 FT.
RAN TOOL WITH 5 1/2 ROLLERS, WELL WAS DEVIATED
AT 77 DEG FROM 4500 TO 17600 FT.
$
LIS FORMAT DATA
** DATA FORMAT SPECIFICATION RECORD **
** SET TYPE- 64EB **
TYPE REPR CODE VALUE
..............................
1 66 0
2 66 0
3 73 16
4 66 1
LIS ?rape Verification Listing
Schlumberger Alaska Computing Center
8-AUG-1997 07:43
PAGE: 6
TYPE REPR CODE VALUE
5 66
6 73
7 65
8 68 0.5
9 65 FT
11 66 64
12 68
13 66 0
14 65 FT
15 66 68
16 66 1
0 66 1
** SET TYPE - CHAN **
NA~E SERV UNIT SERVICE API API API API FILE NUFIB NUMB SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX)
DEPT FT 572358 O0 000 O0 0 2 1 1 4 68 0000000000
GR PS1 GAPI 572358 O0 000 O0 0 2 1 1 4 68 0000000000
TENS PS1 LB 572358 O0 000 O0 0 2 1 1 4 68 0000000000
CCL PS1 V 572358 O0 000 O0 0 2 1 1 4 68 0000000000
** DATA
DEPT. 19749.500 GR.PS1
38.182 TENS.PSi 1777.000 CCL.PS1
-0.262
** END OF DATA **
**** FILE TRAILER ****
FILE NAME : EDIT .002
SERVICE : FLIC
VERSION · O01CO1
DATE : 97/08/ 8
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
LIS ~'ape Verification Listing
Schlumberger Alaska Computing Center
8-AUG-1997 07:43
PAGE:
**** TAPE TRAILER ****
SERVICE NAME : EDIT
DATE : 97/08/ 8
ORIGIN : FLIC
TAPE NAME : 97297
CONTINUATION # : 1
PREVIOUS TAPE :
COF~iENT : BP EXPLORATION, MILNE POINT, MPF-41, API #50-029-22770-00
**** REEL TRAILER ****
SERVICE NAM~ : EDIT
DATE : 97/08/ 8
ORIGIN · FLIC
REEL NAME : 97297
CONTINUATION # :
PREVIOUS REEL :
COf~4ENT : BP EXPLORATION, MIL1VE POINT, MPF-41, API #50-029-22770-00
Sperry-Sun Drilling Services
LIS Scan Utility
Tue Jul 15 04:31:53 1997
Reel Headez
Service name ............. LISTPE
Date ..................... 97/07/15
Origin ................... STS
Reel Name ................ UNKNOWN
Continuation Number ...... 01
Previous Reel Name ....... UNKNOWN
Comments ................. STS LIS Writing Library. Scientific Technical
Services
Tape Header
Service name ............. LISTPE
Date ..................... 97/07/15
Origin ................... STS
Tape Name ................ UNKNOWN
Continuation Number ...... 01
Previous Tape Name ....... UNKNOWN
Comments ................. STS LIS Writing Library. Scientific Technical
Services
Physical EOF
Comment Record
TAPE HEADER
MILNE POINT UNIT
MWD/MAD LOGS
WELL NAME:
API NUMBER:
OPERATOR:
LOGGING COMPANY:
TAPE CREATION DATE:
JOB DATA
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
SURFACE LOCATION
SECTION:
TOWNSHIP:
RANGE:
FNL:
FSL:
FEL:
FWL:
ELEVATION (FT FROM MSL 0)
KELLY BUSHING:
DERRICK FLOOR:
GROUND LEVEL:
WELL CASING RECORD
MWD RUN 1
AK-MM-70147
B. ZIEMKE
T. ANGLEN
1ST STRING
MPF-41
500292277000
BP EXPLORATION (ALASKA), INC.
SPERRY-SUN DRILLING SERVICES
15-JUL-97
MWD RUN 2
AK-MM-70147
B. ZIEMKE
T. ANGLEN
MWD RUN 3
AK-M~-70147
B. ZIEMKE
C. DIXON
6
13N
10E
1954
2625
.00
29.00
12.30
OPEN HOLE CASING DRILLERS
BIT SIZE (IN) SIZE (IN) DEPTH (FT)
2ND STRING
3RD STRING
PRODUCTION STRING
REMARKS:
20.000 112.0
12.250 9.625 9303.0
8.500 19893.0
1. ALL DEPTHS ARE MEASURED DEPTHS (MD) UNLESS OTHERWISE
NOTED.
2. ANNULAR HYDRAULICS ARE CALCULATED USING THE POWER
LAW MODEL.
3. MWD RUNS 1 AND 2 ARE DIRECTIONAL WITH DUAL GAMMA RAY
(DGR) .
4. MWD RUN 3 IS DIRECTIONAL WITH DUAL GAMMA RAY (DGR),
ELECTROMAGNETIC WAVE
RESISTIVITY PHASE-4 (EWR4), COMPENSATED NEUTRON POROSITY
(CNP), AND
STABILIZIED LITHO DENSITY (SLD).
5. THIS WELL REACHED A TOTAL DEPTH (TD) OF 19893'MD,
7948'TVD.
SROP = SMOOTHED RATE OF PENETRATION WHILE DRILLING.
SGRC = SMOOTHED GAMMA RAY COMBINED.
SEXP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (EXTRA
SHALLOW SPACING).
SESP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY
(SHALLOW SPACING).
SEMP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (MEDIUM
SPACING).
SEDP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (DEEP
SPACING).
SFXE = SMOOTHED FORMATION EXPOSURE TIME.
SPSF = SMOOTHED COMPENSATED NEUTRON POROSITY (SANDSTONE
MATRIX-FIXED
HOLE SIZE).
SNNA = SMOOTHED AVERAGE OF NEAR DETECTORS' COUNT RATES.
SNFA = SMOOTHED AVERAGE OF FAR DETECTORS' COUNT RATES.
SBDC = SMOOTHED BULK DENSITY (CALIPER CORRECTED).
SCOR = SMOOTHED STANDOFF CORRECTION.
SFPE = SMOOTHED FAR DETECTOR ONLY PHOTOELECTRIC
ABSORPTION FACTOR.
ENVIRONMENTAL PARAMETERS USED FOR NUCLEAR/NEUTRON LOG
PROCESSING:
HOLE SIZE =
MUD FILTRATE SALINITY =
MUD WEIGHT =
FORMATION WATER SALINITY =
FLUID DENSITY =
MATRIX DENSITY =
LITHOLOGY =
$
File Header
Service name ............. STSLIB.001
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 97/07/15
Maximum Physical Record..65535
File Type ................ LO
Previous File Name ....... STSLIB.000
1000 PPM
8.3 - 9.5 PPG
14545 PPM
1.0 G/CC
2.65 G/CC
SANDSTONE
Comment Record
FILE HEADER
FILE NUMBER: 1
EDITED MERGED
Depth shifted and clipped curves; all bit runs merged.
DEPTH INCREMENT: .5000
FILE SUMMARY
PBU TOOL CODE START
GR 44
ROP 106
FCNT 9289
NCNT 9289
NPHI 9289
FET 9289
RPD 9289
RPM 9289
RPS 9289
RPX 9289
PEF 9291
DRHO 9291
RHOB 9291
$
BASELINE CURVE FOR SHIFTS:
DEPTH
5
0
0
0
0
0
0
0
0
0
.0
.0
.0
CURVE SHIFT DATA (MEASURED DEPTH)
BASELINE DEPTH
44 5
18586
18590
18894
18898
18900
18905
18907
18973
18974
18979
19003
19074
19182
19187.
19195.
19201.
19203.
19205
19212
19230
19234
19249
19252
19273
19281
19302
19313
19322
19325
19341
19383
19407
19408
19420
19425
19428
19436
19439
19452
19474
19479
19484
GR
58
5 18600
0 18605
0 18911
0 18915
0 18917
0 18922
0 18924
0 18988
5 18991
0 18995
0 19022
5 19096
0 19201
5 19204
0 19209
0 19213
0 19216
0 19222
5 19231
0 19249
5 19252
0 19266
5 19270
0 19299
5 19309
0 19320
5 19331
5 19340
5 19343
5 19359
0 19398
0 19424
5 19426
0 19438
5 19443
0 19446
0 19454
0 19456
5 19471
0 19490
0 19496
0 19503
5
5
5
0
5
0
.5
.5
.5
.0
,5
.0
.5
.0
,0
.5
,5
.5
0
5
0
0
5
0
0
5
0
5
5
5
5
5
0
5
0
5
0
0
5
5
5
0
5
STOP DEPTH
19803.0
19875.5
19757.5
19757.5
19757.5
19783.5
19783.5
19783.5
19783.5
19783.5
19792.0
19792.0
19792.0
EQUIVALENT UNSHIFTED DEPTH
19493
19499
19503
19513
19520
19525
19531
19548
19589
19591
19594
19875
$
.5
.0
.5
.5
5
0
0
5
0
0
5
5
MERGED DATA SOURCE
PBU TOOL CODE
MWD
MWD
MWD
$
REMARKS:
19511 0
19517 0
19521 0
19530 5
19537 0
19543 0
19549 0
19565 0
19606 0
19607 5
19611 5
19892 5
BIT RUN NO MERGE TOP MERGE BASE
1 120.0 5011.0
2 5011.0 9326.0
3 9326.0 19893.0
MERGED MAIN PASS.
$
Data Format Specification Record
Data Record Type .................. 0
Data Specification Block Type ..... 0
Logging Direction ................. Down
Optical log depth units ........... Feet
Data Reference Point .............. Undefined
Frame Spacing ..................... 60 .liN
Max frames per record ............. Undefined
Absent value ...................... -999.25
Depth Units .......................
Datum Specification Block sub-type...0
Name Service Order Units Size Nsam Rep
DEPT FT 4 1 68
ROP MWD FT/H 4 1 68
GR MWD AAPI 4 1 68
RPX MWD OHMM 4 1 68
RPS MWD OHM~ 4 1 68
RPM MWD OH/~4 4 1 68
RPD MWD OHMM 4 1 68
FET MWD HOUR 4 1 68
NPHI MWD P.U. 4 1 68
NCNT MWD CTS/ 4 1 68
FCNT MWD CTS/ 4 1 68
RHOB MWD G/CC 4 1 68
DRHO MWD G/CC 4 1 68
PEF MWD BARN 4 1 68
Code Offset Channel
0 1
4 2
8 3
12 4
16 5
20 6
24 7
28 8
32 9
36 10
40 11
44 12
48 13
52 14
Name
DEPT
ROP
GR
RPX
RPS
RPM
RPD
FET
Min
44.5
7.2
11 9242
1 5555
0 4848
0 0761
1 5803
0 2335
Max
19875.5
2110.96
149.511
11.659
2000
2000
2000
76.0079
Mean Nsam
9960 39663
232.884 39540
73.8538 39518
3.22542 20990
3.56166 20990
3.82631 20990
4.42043 20990
1.23037 20990
First
Reading
44.5
106
44.5
9289
9289
9289
9289
9289
Last
Reading
19875.5
19875.5
19803
19783.5
19783.5
19783.5
19783.5
19783.5
NPHI 19.7902 65.3677 38.9664 20938
NCNT 2272 3472 2751.06 20938
FCNT 463 931 659.021 20938
RHOB 1.4183 2.8731 2.36656 21003
DRHO -0.108 0.3877 0.0230935 21003
PEF 1.3386 4.3307 2.07352 21003
9289
9289
9289
9291
9291
9291
19757.5
19757.5
19757.5
19792
19792
19792
First Reading For Entire File .......... 44.5
Last Reading For Entire File ........... 19875.5
File Trailer
Service name ............. STSLIB.001
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 97/07/15
Maximum Physical Record..65535
File Type ................ LO
Next File Name ........... STSLIB.002
Physical EOF
File Header
Service name ............. STSLIB.002
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 97/07/15
Maximum Physical Record..65535
File Type ................ LO
Previous File Name ....... STSLIB.001
Comment Record
FILE HEADER
FILE NUMBER: 2
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NUMBER: 1
DEPTH INCREMENT: .5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH STOP DEPTH
GR 58.5 4949.5
ROP 120.0 5010.5
$
LOG HEADER DATA
DATE LOGGED: 24-MAY-97
SOFTWARE
SURFACE SOFTWARE VERSION: 4.96
DOWNHOLE SOFTWARE VERSION: 5.46
DATA TYPE (MEMORY OR REAL-TIME): MEMORY
TD DRILLER (FT): 5011.0
TOP LOG INTERVAL (FT): 120.0
BOTTOM LOG INTERVAL (FT): 5011.0
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE: .0
I~AY~IMUMANGLE: 77.7
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE TOOL NUMBER
DGR DUAL GAMMA RAY
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
BOREHOLE CONDITIONS MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S) :
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3) :
RESISTIVITY (OHMS) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL STANDOFF (IN) :
EWR FREQUENCY (HZ) :
REMARKS:
$
Data Format Specification Record
Data Record Type .................. 0
Data Specification Block Type ..... 0
Logging Direction ................. Down
Optical log depth units ........... Feet
Data Reference Point .............. Undefined
Frame Spacing ..................... 60 .liN
Max frames per record ............. Undefined
Absent value ...................... -999.25
Depth Units .......................
Datum Specification Block sub-type...0
P0747CG8
12.250
12.3
SPUD
9.30
60.0
9.0
2500
8.4
.000
.000
.000
.000
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
GR MWD 1 AAPI 4 1 68 4 2
ROP MWD 1 FT/H 4 1 68 8 3
28.9
First
Name Min Max Mean Nsam Reading
DEPT 58.5 5010.5 2534.5 9905 58.5
GR 11.9242 104.823 50.0195 9783 58.5
ROP 19.0496 2110.96 283.431 9782 120
Last
Reading
5010.5
4949.5
5010.5
First Reading For Entire File .......... 58.5
Last Reading For Entire File ........... 5010.5
File Trailer
Service name ............. STSLIB.002
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 97/07/15
Maximum Physical Record..65535
File Type ................ LO
Next File Name ........... STSLIB.003
Physical EOF
File Header
Service name ............. STSLIB.003
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 97/07/15
Maximum Physical Record..65535
File Type ................ LO
Previous File Name ....... STSLIB.002
Comment Record
FILE HEADER
FILE NUMBER: 3
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NUMBER: 2
DEPTH INCREMENT: .5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH
GR 4950.0
ROP 5012.0
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
STOP DEPTH
9260.5
9325.5
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
DGR DUAL GAMMA RAY
$
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT) :
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY S):
MUD PH:
MUD CHLORIDES PPM):
FLUID LOSS (C3 :
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
26-MAY- 97
4.96
5.46
MEMORY
9326.0
5011.0
9326.0
75.7
78.4
TOOL NUMBER
P0747CG8
12.250
12.3
SPUD
9.30
52.0
9.0
1800
6.8
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION
(IN):
TOOL STANDOFF (IN) :
EWR FREQUENCY (HZ) :
REMARKS:
$
Data Format Specification Record
Data Record Type .................. 0
Data Specification Block Type ..... 0
Logging Direction ................. Down
Optical log depth units ........... Feet
Data Reference Point .............. Undefined
Frame Spacing ..................... 60 .liN
Max frames per record ............. Undefined
Absent value ...................... -999.25
Depth Units .......................
Datum Specification Block sub-type...0
.000
.000
.000
.000
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
GR MWD 2 AAPI 4 1 68 4 2
ROP MWD 2 FT/H 4 1 68 8 3
36.7
First
Name Min Max Mean Nsam Reading
DEPT 4950 9325.5 7137.75 8752 4950
GR 16.6902 108.063 64.6381 8622 4950
ROP 13.7903 1829.96 210.904 8628 5012
Last
Reading
9325.5
9260.5
9325.5
First Reading For Entire File .......... 4950
Last Reading For Entire File ........... 9325.5
File Trailer
Service name ............. STSLIB.003
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 97/07/15
Maximum Physical Record..65535
File Type ................ LO
Next File Name ........... STSLIB.004
Physical EOF
File Header
Service name ............. STSLIB.004
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 97/07/15
Maximum Physical Record..65535
File Type ................ LO
Previous File Name ....... STSLIB.003
Comment Record
FILE HEADER
FILE NUMBER: 4
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN NUMBER: 3
DEPTH INCREMENT: .5000
FILE SUMMARY
VENDOR TOOL CODE START DEPTH STOP DEPTH
GR 9254.5 19820.0
FCNT 9303.0 19774.5
NCNT 9303.0 19774.5
NPHI 9303.0 19774.5
FET 9303.0 19800.5
RPD 9303.0 19800.5
RPM 9303.0 19800.5
RPS 9303.0 19800.5
RPX 9303.0 19800.5
PEF 9305.0 19809.0
DRHO 9305.0 19809.0
RHOB 9305.0 19809.0
ROP 9327.0 19892.5
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME):
TD DRILLER (FT) :
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT) :
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
DGR DUAL GAMMA RAY
EWR4 ELECTROMAG. RESIS. 4
CNP COMPENSATED NEUTRON
SLD STABILIZED LITHO DEN
$
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
BOREHOLE CONDITIONS MUD TYPE:
MUD DENSITY (LB/G) :
MUD VISCOSITY S) :
MUD PH:
MUD CHLORIDES PPM) :
FLUID LOSS (C3 :
RESISTIVITY (OHN~) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
04-JUN-97
4.96
5.46
MEMORY
19893.0
9326.0
19893.0
36.0
77.9
TOOL NUMBER
P0742CRDGP6
P0742CRDGP6
P0742CRDGP6
P0742CRDGP6
8.500
8.5
LSND
9.50
44.0
9.0
1000
4.0
1.900
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
REMARKS:
$
Data Format Specification Record
Data Record Type .................. 0
Data Specification Block Type ..... 0
Logging Direction ................. Down
Optical log depth units ........... Feet
Data Reference Point .............. Undefined
Frame Spacing ..................... 60 .liN
Max frames per record ............. Undefined
Absent value ...................... -999.25
Depth Units .......................
Datum Specification Block sub-type...0
.887
1.300
2.800
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
GR MWD 3 AAP I 4 1 68 4 2
RPX MWD 3 OHMM 4 1 68 8 3
RPS MWD 3 OHMM 4 1 68 12 4
RPM MWD 3 OHMM 4 1 68 16 5
RPD MWD 3 OHMM 4 1 68 20 6
NPHI MWD 3 P.U. 4 1 68 24 7
ROP MWD 3 FT/H 4 1 68 28 8
FET MWD 3 HOUR 4 1 68 32 9
FCNT MWD 3 CNTS 4 1 68 36 10
NCNT MWD 3 CNTS 4 1 68 40 11
RHOB MWD 3 G/CC 4 1 68 44 12
DRHO MWD 3 G/CC 4 1 68 48 13
PEF MWD 3 BARN 4 1 68 52 14
72.2
First
Name Min Max Mean Nsam Reading
DEPT 9254.5 19892.5 14573.5 21277 9254.5
GR 24.7464 149.511 88.6194 21132 9254.5
RPX 1.5555 11.659 3.22585 20996 9303
RPS 0.4848 2000 3.56195 20996 9303
RPM 0.0761 2000 3.82644 20996 9303
RPD 1.5803 2000 4.42046 20996 9303
NPHI 19.7902 65.3677 38.963 20944 9303
ROP 7.2 1922.59 218.396 21132 9327
FET 0.2335 76.0079 1.2309 20996 9303
FCNT 463 931 659.047 20944 9303
NCNT 2272 3472 2751.16 20944 9303
RHOB 1.4183 2.8731 2.36654 21009 9305
DRHO -0.108 0.3877 0.0230943 21009 9305
PEF 1.3386 4.3307 2.07354 21009 9305
Last
Reading
19892.5
19820
19800.5
19800.5
19800.5
19800.5
19774.5
19892.5
19800.5
19774.5
19774.5
19809
19809
19809
First Reading For Entire File .......... 9254.5
Last Reading For Entire File ........... 19892.5
File Trailer
Service name ............. STSLIB.004
Service Sub Level Name...
Version Number ........... 1.0.0
Date of Generation ....... 97/07/15
Maximum Physical Record..65535
File Type ................ LO
Next File Name ........... STSLIB.005
Physical EOF
Tape Trailer
Service name ............. LISTPE
Date ..................... 97/07/15
Origin ................... STS
Tape Name ................ UNKNOWN
Continuation Number ...... 01
Next Tape Name ........... UNKNOWN
Comments ................. STS LIS Writing Library.
Services
Reel Trailer
Service name ............. LISTPE
Date ......... ~ ........... 97/07/15
Origin ................... STS
Reel Name ................ UNKNOWN
Continuation Number ...... 01
Next Reel Name ........... UNKNOWN
Comments ................. STS LIS Writing Library.
Services
Scientific Technical
Scientific Technical
Physical EOF
Physical EOF
End Of LIS File