Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
HOME
EVENTS
DATA
Data List
Drilling
Production
Orders
Data Miner
Document Search
REPORTS
Reports and Charts
Pool Statistics
FORMS
LINKS
Links
Test Notification
Data Requests
Regulations
Industry Guidance Bulletins
How to Apply
ABOUT US
History
Staff
HELP
Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
176-076
1 Regg, James B (OGC) From:Brooks, Phoebe L (OGC) Sent:Monday, February 27, 2023 4:44 PM To:Tom Kavanagh - (C) Cc:Regg, James B (OGC) Subject:RE: BOPE Test Report CDR2 Attachments:Nabors CDR2AC 01-27-23 Revised.xlsx Tom, Attached is a revised report changing the well name to 09‐09, based on PTD #1760760 and sundry 322‐723. I also rounded the control system response times as they are whole numbers only. Please update your copy or let me know if you disagree. Thank you, Phoebe Phoebe Brooks Research Analyst Alaska Oil and Gas Conservation Commission Phone: 907‐793‐1242 CONFIDENTIALITY NOTICE: This e-mail message, including any attachments, contains information from the Alaska Oil and Gas Conservation Commission (AOGCC), State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged information. The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an unintended recipient of this e-mail, please delete it, without first saving or forwarding it, and, so that the AOGCC is aware of the mistake in sending it to you, contact Phoebe Brooks at 907-793-1242 or phoebe.brooks@alaska.gov. From: Tom Kavanagh ‐ (C) <Tom.Kavanagh@hilcorp.com> Sent: Saturday, January 28, 2023 9:47 PM To: Regg, James B (OGC) <jim.regg@alaska.gov>; DOA AOGCC Prudhoe Bay <doa.aogcc.prudhoe.bay@alaska.gov>; Brooks, Phoebe L (OGC) <phoebe.brooks@alaska.gov> Cc: Alaska NS ‐ CTD DSM <AlaskaNS‐CTD‐DSM@hilcorp.com> Subject: BOPE Test Report CDR2 Hello, Here is our initial test on well 09‐09A. Thank you, Tom Kavanagh CTD Drillsite Manager – CDR2 Rig 907 670 3097 Cell 907 841 2410 H4169 CAUTION: This email originated from outside the State of Alaska mail system. Do not click links or open attachments unless you recognize the sender and know the content is safe. PBU 09-09PTD 1760760 STATE OF ALASKA OIL AND GAS CONSERVATION COMMISSION *All BOPE reports are due to the agency within 5 days of testing* Submit to:jim.regg@alaska.gov; AOGCC.Inspectors@alaska.gov; phoebe.brooks@alaska.gov Rig Owner:Rig No.:CDR2AC DATE:1/27/23 Rig Rep.:Rig Email: Operator: Operator Rep.:Op. Rep Email: Well Name:PTD #1760760 Sundry #322-723 Operation:Drilling:Workover: X Explor.: Test:Initial: X Weekly:Bi-Weekly:Other: Rams:250/3500 Annular:250/3500 Valves:250/3500 MASP:2460 MISC. INSPECTIONS:TEST DATA FLOOR SAFETY VALVES: Test Result/Type Test Result Quantity Test Result Housekeeping P Well Sign P Upper Kelly 0 NA Permit On Location P Hazard Sec.P Lower Kelly 0 NA Standing Order Posted P Misc.NA Ball Type 4 P Test Fluid Water Inside BOP 0 NA FSV Misc 2 P BOP STACK:Quantity Size/Type Test Result MUD SYSTEM:Visual Alarm Stripper 1 2"P Trip Tank P P Annular Preventer 1 7 1/16" GK P Pit Level Indicators P P #1 Rams 1 Blind / Shears P Flow Indicator P P #2 Rams 1 2.0" Pipe / Slip P Meth Gas Detector P P #3 Rams 1 2 3/8"x3-1/2" VBR P H2S Gas Detector P P #4 Rams 1 2.0" Pipe / Slip FP MS Misc 0 NA #5 Rams 0 NA #6 Rams 0 NA ACCUMULATOR SYSTEM: Choke Ln. Valves 1 2-1/16"P Time/Pressure Test Result HCR Valves 2 2-1/16"P System Pressure (psi)3000 P Kill Line Valves 1 2-1/16"P Pressure After Closure (psi)2200 P Check Valve 0 NA 200 psi Attained (sec)19 P BOP Misc 2 2.0" Piper FP Full Pressure Attained (sec)56 P Blind Switch Covers:All stations Yes CHOKE MANIFOLD:Bottle Precharge:P Quantity Test Result Nitgn. Bottles # & psi (Avg.):10@1910 P No. Valves 12 P ACC Misc 0 NA Manual Chokes 1 P Hydraulic Chokes 1 P Control System Response Time:Time (sec)Test Result CH Misc 0 NA Annular Preventer 4 P #1 Rams 3 P Coiled Tubing Only:#2 Rams 3 P Inside Reel valves 1 P #3 Rams 3 P #4 Rams 2 P Test Results #5 Rams 0 NA #6 Rams 0 NA Number of Failures:2 Test Time:7.0 HCR Choke 2 P Repair or replacement of equipment will be made within days. HCR Kill 2 P Remarks: AOGCC Inspection 24 hr Notice Yes Date/Time 01/23/23 05:27 Waived By Test Start Date/Time:1/26/2023 22:00 (date)(time)Witness Test Finish Date/Time:1/27/2023 8:00 BOPE Test Report Notify the AOGCC of repairs with written confirmation to: AOGCC.Inspectors@alaska.gov Adam Earl Nabors F/P on Lower 2" Pipe/Slip rams were cycled then Pass. F/P on BOP Test Valve1 valve was greased then passed. We have an additional 2 TIW and 2 Dart valves on this well. R.Coyne / W. Williams Hilcorp North Slope, LLC M.Igtanloc / T. Kavanagh PBU 09-09 Test Pressure (psi): robert.coyne@nabors.com alaskans-ctd-dsm@hilcorp.com Form 10-424 (Revised 08/2022)2023-0127_BOP_Nabors_CDR2AC_PBU_09-09 J. Regg; 5/31/2023 MN-80 / S00- 95 / RS-95 1000 sx Class G, 300 sx AS, 250 sx Class G By James Brooks at 3:13 pm, Feb 13, 2023 Abandoned 2/1/2023 JSB RBDMS JSB 022823 xG MGR28JULY2023 DSR-3/3/23 2.13.2023 Digitally signed by Monty M Myers DN: cn=Monty M Myers, c=US, o=Hilcorp Alaska, LLC, ou=Technical Services - AK Drilling, email=mmyers@hilcorp.com Reason: I am approving this document Date: 2023.02.13 15:02:45 -09'00' Monty M Myers ACTIVITYDATE SUMMARY 1/15/2023 ***WELL S/I ON ARRIVAL*** (Ctd) DRIFTED w/ 6.02" GAUGE RING TO BAL-O NIPPLE @ 2,208' MD THUNDERBIRD PUMPED 200BBLS CRUDE BRUSHED NIPPLE w/ 7" BLB & 4.65" GAUGE RING. ***CONTINUED ON 1/16/23 WSR*** 1/15/2023 T/I/O= 400/1850/250 Temp=S/I (TFS Unit 4 Assist SL with Load and Test) Loaded TBG With 2 bbls 60/40 followed by 200 bbls crude. ***Job continued on 01/16/2023*** 1/16/2023 ***Job continued from 01/15/2022*** TFS unit 4 Assist SL (Load & Test) Assist SL in Pulling and Setting SSSV ***Job continued on 01/17/2023*** 1/16/2023 ***CONTINUED FROM 1/15/23 WSR*** (Ctd) SET 5.937" DSSSV w/ P-PLUG BODY @ 2,208' MD (No cl or bl integrity, spring missing from z-6) PULLED DSSSV @ 2,208' MD (6.5 hrs jarring) ***CONTINUED ON 1/17/23 WSR*** 1/17/2023 ***CONTINUED FROM 1/16/23 WSR*** SET 7" DSSSV PLUG IN BAL-O NIP @ 2208' MD (DSSSV PLUG BODY= 55" oal, 4x 3/16" eq ports / PRONG= 72" oal, 3.72" cent, 2.31" FN) T-BIRD PERFORMED MIT-T TO 2500 PSI **PASS** ***WELL S/I ON DEPARTURE*** 1/17/2023 ***Job continued from 01/16/2023*** TFS unit 4 assist slick line (L&T) *******MIT-T PASSED***** MIT-T PASSED to 2610 psi. Max Applied Pressure= 2750. Target Pressure=2500. 1st 15 min TBG lost 50 psi. 2nd 15 Min TBG lost 15 psi. TBG lost 65 psi in a 30 Min test. Bled back 1.2 bbls. Final WHPS= 0/1495/277 SL in Control of well upon departure. 1/21/2023 T/I/O=0/0/0.Set 6" CIW TWC #403.LTT (PASSED). RD Production Tree. RU CDR Tree. Torque to API specs. PT Tree against TWC 300 psi low & 5000 psi high. (PASSED). Pulled TWC. Fianl WHP's= SI/0/0.***JOB COMPLETE***. RDMO. 1/21/2023 ***WELL S/I ON ARRIVAL*** (CTD) POLLARD #60 RIG UP ***CONT ON 1/22/23 WSR*** 1/22/2023 **** WELL SI ON ARRIVAL *** Intital T/I/O = 100/1400/250 RU Eline and GyroData for pre rig direcrtional survey. Hoist Gyro tools under the direction of GyroData. Surveyed from surface - 10,350'. TD @ 10,396' Well SI on departure, final T/I/O = 100/1400/250 *** JOB COMPLETE *** 1/22/2023 ***CONT FROM 1/21/23 WSR*** (CTD) PULLED 7" DSSSV PLUG @ 2208' MD ***JOB COMPLETE, WELL LEFT S/I, DSO NOTIFIED*** Daily Report of Well Operations PBU 09-09 Activity Date Ops Summary 1/23/2023 Continue moving rig to Drill Site 9. Rig on location. Wait on final gravel pad lift. Install rig mat dance floor. PJSM with Cruz. Back trucks under. Spot sub module over well. Spot pit module. Set down and accept rig at 23:00. R/U Cellar. Connect PUTZ. Spot return tanks. LTT tree valves. Master valve leaking. Call grease crew. Continue MIRU checklist. LTT tree valves. Pass. N/U BOP stack. 1/24/2023 Continue NU BOPE. NU MPD Line and Choke Trailer line to 3-1/2" modified spool. Well support rigging up TT return line and choke trailer (for drilling liner annulus bleed off). Valve Crew on location to RU and set a 2-Way Check in 7". WO Well Support to finish return line RU and PT. Return line & choke trailer RU and PT'd to 4250psi. Stab Valve Crew Lubricator on stack and PT 250 low and 3500 high. Good PT bleed off to 700psi and open M & S Valves. Set 2-way check and PT to 250psi low and 3500psi high. Good PT, bleed off and blow down stack to the TT, pressure not bleeding off, line inside the rig is froze up, bleed off lubricator to bleed trailer. Ice plug at the valve just outside the rig, steamed line and line is thawed. Blow down line and remove VC lubricator. Remove hyd and LD Lubricator in PS. Tools LD, MU a nozzle on the coil, stab on and fluid pack coil and surface lines. During fluid pack of coil tubing, pressure exceeded 4800 psi and then fell off suddenly. Rig injector back and test eline. Eline failed MEG test. Cut coil and eline to find competent eline. Test eline every 100'. Discover bird nested eline in coil. Continue cutting coil and eline. Verify collector and pressure bulkhead eline test is good. Continue cutting coil and eline. Testing every 100' for wireline integrity. Cut total of 2000' of coil and eline. Discuss options moving forward. Continue cutting coil and testing eline until final length of 13,000'. Simultaneously prep to blow down and swap reels. 1/25/2023 Continue cutting coil testing eline every 100'. We have cut 2423', we are at the minimum length we would need to drill this well and the next on and eline is still not testing. Prep to blow down and swap reels. MU a CTC for nozzle to blow down. HES N2 on location, spot unit, RU and cool down to blow down reel. Pressure bulkhead was removed last night, PT Reel iron to 3500psi. N2 cooled down ready to PT, hold PJSM to blow down reel. Pad Op notified for venting N2 on the pad. PT N2 line to 35500psi and pump 5 bbls of neat meth into the coil. N2 line PT'd, online with N2 at 1500sqft/min for 15 min. N2 at the WH, shut down N2 and bleed off. Remove reel iron and pressure bulkhead. MU grapple and coil and prep to unstab coil. Unstab coil and secure at reel. Continue prep reel for offload. Lower reel onto truck and secure for transport. Take old reel to Nabors 1ES yard and offload. Load up new reel and bring to rig. Spot reel truck at rig, open reel doors and hook up slings. Lift new reel into stand, close reel doors. Torque up saddle clamps. Remove stripper, install new brass. Remove shipping wrap from reel. 1/26/2023 Continue with reel swap. Stab coil into injector. Ream coil for CTC. MU CTC and pull test. Good pull test to 40k. Remove Snow and Ice from inner reel to MU the reel iron. Head up BHI UQC. MU the pressure bulkhead. Secure reel iron and move injector cart. Remove drilling riser install night cap. Line up valves to fill stack. Fluid pack BOP stack and surface lines. Shell test BOP stack 250 / 3500 psi against TWC, bleeding off slightly. Bleed off pressure get small amount of gas back, TWC not holding. Close tree valves. Will test BOPs against closed tree valves then change out TWC. Circ and fluid pack lines. Grease valves. Get stack measurements. Test BOPs as per Hilcorp and AOGCC Regulations. All tests to 250 / 3500 psi. Test witness waived by AOGCC inspector Adam Earl. Test 1: C7, C9, C10, C11 - Pass. Test 2: Blind/Shears, R2, BL2, C15 - Pass. Install test joint. Test 3: Annular (2"), TIW1, B1, B4 - Pass. Test 4: Upper 2" Pipe/Slips, TIW2, B2, B3. Grease valves T1, T2, both swabs and inside gate valve on 3-1/2" tubing spool. Test 5: Lower 2" Pipe/Slip, C5, C6, C8, TV2 . F/P on Lower 2" Pipe/Slip cycle rams then pass. Test 6: Choke A, Choke C - Pass. Test 7: VBR (2-3/8"), C1, C4, TV1 . F/P on TV1, grease then pass. Test 8: VBR (3-1/2"), C2, C3 - Pass. Rig down BOP test equipment purge w/ air. Install nozzle for filling reel forward. Change CT packoffs. 1/27/2023 Fluid pack pump line with methanol taking fresh water returns to the TT. Reel Temp - Inner 65, Outer = 85. Line up to pump 10 bbls of methanol into reel followed by Hot Fresh Water to fluid pack the coil. Coil fluid packed. Test Gas Alarms. Test #10 . Pack off, Inner Reel Valve . Pass. Pump 1 circulation forward at max rate to pump slack forward. Rate = 2.4 bpm at 4900psi. Shut down pump and PU injector, install test plate and PT Reel Iron to the CTC to 6700psi. Good PT, bleed off, move injector back. Pull TWC and set a new one. New TWC set and is leaking, checked all possible flow paths and no leaks TWC profile might be damaged. Discuss with DE. 2nd TWC not holding, perform rolling test on T1 & T2 Valves and passed. Pull TWC and pump methanol through TWC Profile. Reset TWC to test Swab 1 & Swab 2. Swab 1 passed, bleed off and test swab 2. Good test, PU VC Lubricator and swap tools to retrieve the TWC. Pull TWC. Offload TWC pulling equipment. Flush stack out to tiger tank. Swap out risers, install QTS. Install floats in UQC. PT connection and floats, good. Install weight bars for testing PDLs. Test PDLs, good. M/U XO on dart and TIW back to BOP test hose fitting. Test one of the dart valve and TIW for the velocity string, good. Rig down test equipment, prep to BH kill well. M/U nozzle and stinger. BH kill well. 10 bbls MeOH. 420 bbls 1% KCl. Open to tiger tank, check loss rate 4.75 bpm In / 1.35 bpm Out. 30 bbls Polyswell. 20 bbls Fresh water. 225 bbls 1% KCl. 1/28/2023 BH Kill completed, in rate = 4.75 bpm, out rate = 1.35 bpm, loss rate = 204 bph. Increase LCM PolySwell Pill from 10.5 ppb to 20 ppb. Mix 25 bbls at 20 ppb PolySwell Pill (hesitate 10min) then Bullhead . 27 bbls PolySwell, 10 bbls KCl, 22 bbls Freshwater at 3.5 bpm, swap to 1% KCl and increase rate to 7+ bpm. Frac info = 12.8 ppg eq, Max WHP = 2013psi. 289 bbls away PolySwell at the perfs WHP = 760 psi at 7.3 bpm. 300 bbls away WHP = 1560psi. 304 bbls away WHP = 1624psi reduce rate to 5.5 bpm. 316 bbls away WHP = 1430psi all PolySwell away. 326 bbls away WHP = 1061psi Freshwater at the perfs reduce rate to 1 bpm. 330 bbls away WHP = 0psi increase rate to 1.5 bpm to maintain a little WHP. 338 bbls away WHP = 33psi at 1.5 bpm. 348 bbls away WHP = 28psi at 1.5 bpm, line up to take returns back to the pits circulating across the top. Allow PolySwell to soak for 1-hr. Rate across the top = 2.17 bpm, out rate = 0.85 bpm, loss rate 1.32 bpm or 79 bph. Static loss rate is still the same at ~84 bph. Close the choke and see what the WHP builds up to. 2.5 bpm = 365psi WHP. 5.5 bpm = 935 psi WHP. 6.5 bpm = 1030 psi WHP. Prep to pump another 20 ppb pill. Fire Drill with Jones Crew. PolySwell Pill #2 . Mix 25 bbls at 20 ppb PolySwell Pill (hesitate 10min) then Bullhead . 29 bbls PolySwell, 10 bbls KCl, 20 bbls Freshwater at 3.5 bpm, swap to 1% KCl and increase rate to 5.0 bpm, WHP = 770psi. Frac info = 12.8 ppg eq, Max WHP = 2013psi. Very minimal PolySwell came back to surface be. 285 bbls away PolySwell at the perfs WHP = 1300 psi at 4.5 bpm. 300 bbls away WHP = 1389psi at 3.5 bpm. 303 bbls away WHP = 1709psi reduce rate to 1.6 bpm. 318 bbls away. WHP = 1229psi all PolySwell away. 328 bbls away WHP = 866psi Freshwater at the perfs reduce rate to 1 bpm. 331 bbls away WHP = 345psi at 1.0 bpm. First pill at this point we were at 28 psi WHP at 1.5 bpm. Reduce rate to 0.75 bpm, WHP = 217 psi. 0.75 bpm at 261psi WHP and slowly climbing. Loss rate is between 20-24 bph. Prep to PU WS and RIH to set. PU the NSAK WS & BHI MWD. RIH with WS BHA. 9877 WT CK = 42k, RIH WT = 27k. 10200' log gamma tie in. Logged down to 10,319' and Geo is not seeing anything that the PDC Log has for tie in. PUH and CCL Log to see if we can see the Nipple and WLEG in the TBG Tail. Shift CCL +80' correction. PU log GR again from 10240' correct -2'. Up wt 43k. PU log CCL again from 10100' match jewelry within 2' of PDC. RIH to set depth. Bit depth 10390.75' places top WS at 10382.0' at 0L TF. Get up wt back to 40k. Close EDC, pressure up setting tool shears out at 2171 psi Diff. Slackoff 4.1k DWOB hold for 1 min, solid. Good set. Top WS at 10382.0 at 0L TF. Open EDC POOH pump 1.8 bpm. Tag stripper, assess loss rate 24 bbl/hr with injector on. L/D BHA #1, setting tool has functioned normally. Keep well full through MP line. Remove QTS and CT riser sections. Continue strapping and drifting 3-1/2" liner for velocity string. Remove flange to riser on top of annular and install spool. 1/29/2023 7-1/16 riser MU. Continue loading, strapping and drifting 3-1/2 tubing. Inspect and grease top drive. Review tally and jt count. Rig up choke on hole fill line for continuous hole fill. M/U 3-1/2" velocity string. Maintain continuous hole fill 28 . 30 bbl/hr. D1 drill w/ McGrath crew while M/U velocity string. 50-029-20232-01-00API #: Well Name: Field: County/State: PBE 09-09A Prudhoe Bay East Hilcorp Energy Company Composite Report , Alaska 1/31/2023Spud Date: 1/30/2023 Continue running 3-1/2" Velocity string, on jt 172 of 314. All 235 jts of 3-1/2" ST-L ran, MU thread X-O to 3-1/2" VamTop and run 79 jts. 270 jts ran, hold KWT Drill (Jones crew). Well secured in 3:10, no deficiencies to report. Continue running TBG to 9862'. MU Hanger and landing joint, land hanger, 5' stick in 21.9'. PU WT = 100k, Hanging WT = 93k, SO WT = 72k. Hanger landed on depth, RILDS. Close Swab 1 & 2. Line up on MPD Line for hole fill. Swap out 7-1/16 Riser for 7-1/16 Otis Flange & Drilling Riser. Risers swapped, prep to fluid pack and PT Swabs 1 & 2 then swap rams. Both swabs leaking, call out grease crew to service tree valves. Service both valves, swab 1 failed. Re-grease, swab 1 pass. Swab 2 pass. Vac out stack past BOPs. De-energize koomey, remove 2-3/8" x 3-1/2" VBR install 2-3/8" Pipe/Slip rams. Test 2-3/8" Pipe/Slip rams 250 / 3500 psi, good. Test witness is waived by AOGCC Inspector Brian Bixby. Remove test riser install QTS. PT riser break, good. M/U BHA #2 window mill and reamer. Mill and reamer 2.80" NoGo 2.81" Go. M/U injector. RIH. BHA #2, window mill and reamer. Tie-in depth from 10200', correct -10'. Up wt at 10340 is 43k. Close EDC. Light tag (1.7k DWOB) dry at 10385'. Pick up bring pump to 1.8 bpm. Ease down to engage casing. Mill window from 10384.5' 1.77 / 1.21 bpm In/Out. 2350 . 2400 psi Circ. MW 8.39 / 8.39 ppg. Window ECD = 8.88 ppg. 1/31/2023 Continue milling window at 10386.4. Rate In 1.77 bpm, Out Rate = 1.18 bpm, Loss Rate = ~35 bph. Density In = 8.38 ppg, Out Density = 8.39 ppg. Window ECD = 8.91 ppg. Continue milling window at 10386.4. Rate In 1.77 bpm, Out Rate = 1.21 bpm, Loss Rate = ~34 bph. Density In = 8.38 ppg, Out Density = 8.39 ppg. Window ECD = 8.94 ppg. Continue milling window at 10388.0. Rate In 1.74 bpm, Out Rate = 1.23 bpm, Loss Rate = ~31 bph. Density In = 8.39 ppg, Out Density = 8.39 ppg. Window ECD = 8.98 ppg. 10388.1 slow progress with 3.38k WOB, PU 2' to check WOB then ease back down. WOB is correct, the mill is at the mid-point of the 9-5/8" and the string mill is dressing the bottom of the window. COM problem w/ BHI connection in Putz. Troubleshoot and restart computers. DWOB went to 0 on restart, pick up and get parameters again. Continue milling window at 10388.9. Rate In 1.74 bpm, Out Rate = 1.22 bpm. Density In = 8.39 ppg, Out Density = 8.39 ppg. Window ECD = 8.96 ppg. Stall at 10389.7' likely casing exit depth. Keep milling 1 ft/hr to let reamer work. Rate In 1.74 bpm, Out Rate = 1.28 bpm. Density In = 8.39 ppg, Out Density = 8.39 ppg. Window ECD = 9.00 ppg. Drill rathole to 10400'. Pump 10 bbls mud sweep. 1st reaming pass up 0L see 70 psi Motor Work 10388'. 1st pass down 0L 30 psi MW 10386.6'. 2nd up 0L 50 psi MW 10384'. 2nd down 0L 30 psi MW 10386'. Continue reaming window. 3rd up 0L 45 psi MW 10384'. 3rd down 0L 40 psi MW 10386'. 4th up 0L 35-40 psi MW 10384'. 4th down 0L 30 psi MW 10386'. 5th up 0L 35-40 psi MW. Continue reaming window. 5th down 0L 25-30 psi MW 10386'. 6th up 0L 30-35 psi MW 10383'. 6th down 0L 25-30 psi MW 10386'. 7th up 15L 30-35 psi MW 10384'. David Douglas Hilcorp North Slope, LLC Sr. Geotechnician 3800 Centerpoint Drive, Suite 1400 Anchorage, AK 99503 Tele: (907) 777-8337 E-mail: david.douglas@hilcorp.com Please acknowledge receipt by signing and returning one copy of this transmittal Received By: Date: Hilcorp North Slope, LLC Date: 02/03/2023 To: Alaska Oil & Gas Conservation Commission Natural Resource Technician 333 W 7th Ave Suite 100 Anchorage, AK 99501 DATA TRANSMITTAL PBU 09-09 -PTD 176-076 -API 50-029-20232-00-00 Definitive Directional Survey (Gyro + MWD Composited) Gyrodata Survey 01/23/2023 Multi-shot Gyro Survey 01/14/1977 Main Folder Contents: Please include current contact information if different from above. By Meredith Guhl at 3:14 pm, Feb 03, 2023 176-076 T37485 Meredith Guhl Digitally signed by Meredith Guhl Date: 2023.02.03 15:16:16 -09'00' 1 Regg, James B (OGC) From:Tom Kavanagh - (C) <Tom.Kavanagh@hilcorp.com> Sent:Tuesday, January 31, 2023 3:22 AM To:Regg, James B (OGC); DOA AOGCC Prudhoe Bay; Brooks, Phoebe L (OGC) Cc:Alaska NS - CTD DSM Subject:BOPE Test Report CDR2 01/30/23 Ram Swap Attachments:Nabors CDR2 01-30-23.xlsx Hello, here is the BOP Test Report for the single ram swap on CDR2. Thanks, Tom Kavanagh CTD Drillsite Manager – CDR2 Rig 907 670 3097 Cell 907 841 2410 H4169 The information contained in this email message is confidential and may be legally privileged and is intended only for the use of the individual or entity named above. If you are not an intended recipient or if you have received this message in error, you are hereby notified that any dissemination, distribution, or copy of this email is strictly prohibited. If you have received this email in error, please immediately notify us by return email or telephone if the sender's phone number is listed above, then promptly and permanently delete this message. While all reasonable care has been taken to avoid the transmission of viruses, it is the responsibility of the recipient to ensure that the onward transmission, opening, or use of this message and any attachments will not adversely affect its systems or data. No responsibility is accepted by the company in this regard and the recipient should carry out such virus and other checks as it considers appropriate. CAUTION: This email originated from outside the State of Alaska mail system. Do not click links or open attachments unless you recognize the sender and know the content is safe. PBU 09-09PTD 1760760 STATE OF ALASKA OIL AND GAS CONSERVATION COMMISSION *All BOPE reports are due to the agency within 5 days of testing* Submit to:jim.regg@alaska.gov; AOGCC.Inspectors@alaska.gov; phoebe.brooks@alaska.gov Rig Owner:Rig No.:CDR2AC DATE:1/30/23 Rig Rep.:Rig Email: Operator: Operator Rep.:Op. Rep Email: Well Name:PTD #1760760 Sundry #322-723 Operation:Drilling:Workover: X Explor.: Test:Initial:Weekly:Bi-Weekly:Other:X Rams:250/3500 Annular:N/A Valves:N/A MASP:2460 MISC. INSPECTIONS:TEST DATA FLOOR SAFETY VALVES: Test Result/Type Test Result Quantity Test Result Housekeeping P Well Sign P Upper Kelly 0 NA Permit On Location P Hazard Sec.P Lower Kelly 0 NA Standing Order Posted P Misc.NA Ball Type 4 NA Test Fluid Water Inside BOP 0 NA FSV Misc 2 NA BOP STACK:Quantity Size/Type Test Result MUD SYSTEM:Visual Alarm Stripper 1 2"NA Trip Tank P NA Annular Preventer 1 7 1/16" GK NA Pit Level Indicators P NA #1 Rams 1 Blind / Shears NA Flow Indicator P NA #2 Rams 1 2.0" Pipe / Slip NA Meth Gas Detector P NA #3 Rams 1 2-3/8" Pipe / Slip P H2S Gas Detector P NA #4 Rams 1 2.0" Pipe / Slip NA MS Misc 0 NA #5 Rams 0 NA #6 Rams 0 NA ACCUMULATOR SYSTEM: Choke Ln. Valves 1 2-1/16"NA Time/Pressure Test Result HCR Valves 2 2-1/16"NA System Pressure (psi)NA Kill Line Valves 1 2-1/16"NA Pressure After Closure (psi)NA Check Valve 0 NA 200 psi Attained (sec)NA BOP Misc 2 2.0" Piper NA Full Pressure Attained (sec)NA Blind Switch Covers:All stations NA CHOKE MANIFOLD:Bottle Precharge:NA Quantity Test Result Nitgn. Bottles # & psi (Avg.):NA No. Valves 12 NA ACC Misc 0 NA Manual Chokes 1 NA Hydraulic Chokes 1 NA Control System Response Time:Time (sec)Test Result CH Misc 0 NA Annular Preventer NA #1 Rams NA Coiled Tubing Only:#2 Rams NA Inside Reel valves 1 P #3 Rams NA #4 Rams NA Test Results #5 Rams NA #6 Rams NA Number of Failures:0 Test Time:0.5 HCR Choke NA Repair or replacement of equipment will be made within days. HCR Kill NA Remarks: AOGCC Inspection 24 hr Notice Yes Date/Time 1/29/23 07:34 Waived By Test Start Date/Time:1/30/2023 22:00 (date)(time)Witness Test Finish Date/Time:1/30/2023 22:30 BOPE Test Report Notify the AOGCC of repairs with written confirmation to: AOGCC.Inspectors@alaska.gov Brian Bixby Nabors This was a test following a single ram swap. The 2-3/8" x 3-1/2" VBR were removed and 2-3/8" Pipe/Slip rams were installed. R.Coyne / W. Williams Hilcorp North Slope, LLC M.Igtanloc / T. Kavanagh PBU 09-09 Test Pressure (psi): robert.coyne@nabors.com alaskans-ctd-dsm@hilcorp.com Form 10-424 (Revised 08/2022)2023-0130_BOP_Nabors_CDR2AC_ram-change_PBU_09-09 J. Regg; 5/31/2023 10396, 10404, 10492, 10502 7" 26# x 5-1/2" 17# x 4-1/2" 12.6# 12.28.2022 By Anne Prysunka at 10:43 am, Dec 28, 2022 322-723 Digitally signed by Monty M Myers DN: cn=Monty M Myers, c=US, o=Hilcorp Alaska, LLC, ou=Technical Services - AK Drilling, email=mmyers@hilcorp.com Reason: I am approving this document Date: 2022.12.28 07:21:25 -09'00' Monty M Myers DSR-1/11/23MGR11JAN22 10-407 SFD 12/30/2022 BOPE test to 3500 psi. Variance to 20 AAC 25.112(i) alternate plug placement approved for abandonment. Brett W. Huber, Sr. GCW 01/13/23JLC 1/13/2023 1/13/23 RBDMS JSB 011723 To: Alaska Oil & Gas Conservation Commission From: Sean McLaughlin Drilling Engineer Date: December 27, 2022 Re: PBU 09-09 Sundry Request Sundry approval is requested to prepare 09-09 for a CTD sidetrack. Proposed plan for 09-09 Producer: Prior to drilling activities, screening will be conducted to drift for whipstock, caliper and MIT. A hang off spool will be added to the wellhead to accommodate a temporary 3-1/2" drilling liner. See 09-09A PTD request for rig details - A coil tubing drilling sidetrack will be drilled with the Nabors CDR2 rig. The rig will move in, test BOPE and kill the well. A 3-1/2" drilling liner will be run to 9850' to cover up large ID tubing. A 3-1/2" x 7" HEW whipstock will be set with the rig and then cemented in place. A 2.80" dual string window +10’ of formation will be milled out of the 7" and 9-5/8” casing strings. The well will kick off drilling in the Ivishak Zone 2 and target Zone 2 sands. The proposed sidetrack will be completed with a 2-3/8” 13Cr solid liner and cemented in place. The well will be selectively perforated. This completion will completely isolate and abandon the parent Ivishak perfs. This Sundry covers plugging the existing perforations via cement squeeze, liner cement job or liner top packer, if the liner lap pressure test fails (alternate plug placement per 20 AAC 25.112(i)). The following describes the work planned. A wellbore schematic of the current well and proposed sidetrack is attached for reference. Pre-Rig Work - (Estimated to start in January 2023): Pre-Rig Work 1 Slickline Dummy WS drift and caliper to PBTD (~10,396) 2 Fullbore MIT- IA to 2500 psi 3 Valve Shop Bleed wellhead pressures down to zero. 4 Valve Shop Bleed production, flow and GL lines down to zero and blind flange. 5 Valve Shop Pre-CTD wellhead and tree work (install hang off spool with side outlet valves for monitoring pressure, leak-tight master) 6 Operations Remove wellhouse and level pad. Rig Work: x Reference PBU 09-09A PTD submitted in concert with this request for full details. General work scope of Rig work: x MIRU and test BOPE to 3500 psi. MASP with gas (0.10 psi/ft) to surface is 2,460 psi a. Give AOGCC 24hr notice prior to BOPE test b. Test against swab and master valves (No TWC) c. Testing of 3-1/2” liner rams required d. Load pits with drilling fluid e. Open well and ensure zero pressure x Run Whipstock and cement in place a. Kill well prior to picking up whipstock assembly b. 3-1/2” x 7” HEW to be set at 10,382’ 0 ROHS c. Lay down WS running tools and PU a blind sub, stinger, and a nozzle d. Pump 13 bbls of 15.8 ppg cement past the whip and lay in 2 bbl above the WS. e. Wash cement to 10’ above top of the WS tray. POOH 1:1 x Run 3-1/2” drilling liner to 9850’. a. Hang off liner in tubing spool x Mill 2.80” single string window (out of 7” and 9-5/8”) plus 10’ of rathole a. Swap 3-1/2” liner rams for 2-3/8” liner rams. Perform ram test b. Top of window (whipstock pinch point) at 10,385’ MD. c. Mill window with straight motor d. Hold 11.0 ppg MPD while milling window x Drill – Build & Lateral x Run and Cement 2-3/8” L-80 solid liner x Recover 3-1/2” drilling liner and perforate a. Swap to 3-1/2” liner rams b. Pull 3-1/2” drilling liner c. Perforate ~700’ of Zone 2 sand with 1.56” guns. i. If cement quality is suspect, perforating will be done post rig after running a CBL d. Freeze protect well from ~2200’ MD (min) e. RDMO * Approved alternate plug placement per 20 AAC 25.112(i) Sean McLaughlin CC: Well File Drilling Engineer Joseph Lastufka 907-223-6784 Sundry 322-723 PTD 3-1/2" drilling liner to be removed after drilling Well Slimhole Date Quick Test Sub to Otis -1.1 ft Top of 7" Otis 0.0 ft Distances from top of riser Excluding quick-test sub Top of Annular 6.0 ft Top of Annular Element 6.7 ft Bottom Annular 8.0 ft CL Blind/Shears 9.3 ft CL 2" Pipe/Slips 10.1 ft B1 B2 B3 B4 Choke Line Kill Line CL 2-3/8" Pipe/Slips 12.6 ft CL 2" Pipe/Slips 13.4 ft CL of Top Swab 16.0 ft Swab Test Pump Hose T1 T2 Swab 1 CL of Flow Cross 17.4 ft Master CL of Master 18.8 ft LDS IA OA LDS Ground Level CDR2-AC 4 Ram BOP Schematic 21-Nov-17 CDR2 Rig's Drip Pan 7-1/16" 5k Flange X 7" Otis Box Hydril 7 1/16" Annular 2" Pipe/Slips 7-1/16" 5k Mud Cross 2" Pipe/Slips Blind/Shear 7-1/16" 5 Mud Cross 2-3/8" Pipe/Slips 3-1/2" rams required for running and pulling 3-1/2" drilling liner STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMI N REPORT OF SUNDRY WELL OPERATIONS ti 1. Operations Performed Abandon 0 Plug Perforations Q Fracture Stimulate 0 Pull Tubing 0 Operations shutdown 0 Suspend 0 Perforate 0 Other Stimulate 0 Alter Casing 0 Change Approved Program ❑ Plug for Redrill 0 Perforate New Pool 0 Repair Well 0 Re-enter Susp Well 0 Other: 0 S /I SC f(,)u� Lt}' /� 2. Operator Name: BP Exploration(Alaska),Inc 4. Well Class Before Work 5. Permit to Drill Number: 176-076 / 3. Address: P.O.Box 196612 Anchorage, Development Q Exploratory 0 AK 99519-6612 Stratigraphic 0 Service ❑ 6. API Number: 50-029-20232-00-00 7. Property Designation(Lease Number): ADL 0028327 8. Well Name and Number: PBU 09-09 9. Logs(List logs and submit electronic and printed data per 20AAC25.071): 10. Field/Pools: PRUDHOE BAY,PRUDHOE OIL 11.Present Well Condition Summary: ip Total Depth: measured 10800 feet Plugs measured See Attachment feet RECEIVED true vertical 9133 feet Junk measured feet 1 4 2016 Effective Depth: measured 10396 feet Packer measured 10042 feet JULV 0 true vertical 8782 feet Packer true vertical 8479.75 feet AOGCC Casing: Length: Size: MD: TVD: Burst: Collapse: Structural Conductor 78 20"94#H-40 35-113 35-113 1530 520 Surface 2696 13-3/8"72#MN-80 34-2730 34-2730 5380 2670 Intermediate Production See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Liner 610 7"26#13Cr80 10084-10694 8515-9041 7240 5410 Perforation Depth: Measured depth: See Attachment feet True vertical depth: See Attachment feet SCANNED ,J,6,N cyy ,. 2[L7, Tubing(size,grade,measured and true vertical depth) See Attachment See Attachment See Attachment Packers and SSSV(type,measured and See Attachment See Attachment See Attachment true vertical depth) 7"Camco Bal-O SSV 2211 2211 12.Stimulation or cement squeeze summary: Intervals treated(measured): Treatment descriptions including volumes used and final pressure: 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation: 58 222 10608 1497 355 Subsequent to operation: Shut-In 1880 0 14.Attachments:(required per 20 AAC 25.070.25.071,&25.283) 15.Well Class after work: Daily Report of Well Operations Q Exploratory ❑ Development Q Service 0 Stratigraphic 0 Copies of Logs and Surveys Run 0 16.Well Status after work: Oil Q Gas 0 WDSPL 0 Printed and Electronic Fracture Stimulation Data 0 GSTOR ❑ WINJ 0 WAG 0 GINJ 0 SUSP 0 SPLUG ❑ 17.I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O.Exempt: N/A Contact Catron,Garry R(Wipro) Email Garry.Catron@bp.com Printed Name Catron,Garry R(Wipro) Title PDC Principal Engineer Signature A I (/.�:�' -`— Phone +1 907 564 4424 Date 7/13/16 rT1- q Form 10-404 Revised 5/2015 RBDMS LV JULp 2016Submit Original Only • s Plugs Attachment PBU 09-09 SW Name Date MD Description 09-09 06/13/2016 10396 Cement Plug 09-09 06/12/2016 10404 2-1/8" Posiset Plug 09-09 11/11/2010 10492 Cement Plug 09-09 11/08/2010 10502 2-1/8" POSSISET PLUG • • m Q p o 0 0 0 0 0 0 0 0 CrjNN- ccc N- 0 O O Tr O V tt N O tf) up 0 N u) tf) t[) O N- 0 COQ) cc tL) ON- LC)) r 3 .7 . M to M r 00 ' N N N- CO 4 mTm1C) c0 c0 co r- ti N- 00 00 M O r- Cf co 0 00 4 th I- 4 Tm 4 O 00 0- 00 0- N O0 T- O O 4 M to Cs1 Cq CD CD 0100 CO OD H to 4 N N 'a' Tm O O C0 00 M M 07 N O0 to M O M 4 N N- 00 01 c0 00 sir Of� to d O M M f� up O O O L N O f— N N CO p 0 0 N N0) � O M O 0 0 V O) Q O to 4 N 0- tU) 23 0 03 0 0 N C)cy) chMMNNpcI) OCDp _ co N O) 00 C)) = CL p In O O oo O d) p p O0 O U Z Z (n 00 00 U ch C.) CD 60 NNNN l!) In I� r co to 6 01 a, VI 4 t +' CO 10 00 00 O0 Q1 cn O N CD N 0 CD N CO cs) 10 CO N O CV C N Tm Z Z z 0)O 000 cI— w1- 1 • 1- .a 00000 tamQ » D 0000 0 O u_ 0 0 0 O z Z Z z zcOOOWmmmm 0DCCCCCLZ » » cAaaaMI— I— I— I— • • a> N CO• Tr r- T CO N- N Ns O OD UD T- Tr T- O N V- 0 Tr r- Tr L N- 01 N Ul to Tr O Tr N- O) CO to UI C) TN Ns T— O N- .N T- CV 00 c0 01 CD U, CO UI �- N I� O (O 00 1� T 00 CO N N- OOOOr, r_ C)) 0) OO — to CO CO CO CD C)) CD - CY) N- N- OO O Ns N- NsOO Ns Ns CO 00 CO OD 0000 CO OD CO CO O) CD C)) CD 0) 00 CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO 00 CO CO 0 O. 0 .0▪ CO Ns co N O T' to 6 Tr 00 tNs OD t[ O O) CD 00 to UD CD 00 ONO N d' O. ON '- N NO O C) a) to CO CO ti N- N- 0 Ti CO CO N d' N O d N ti CO CO C)) co 0) O O Tr to CO 00 CO CA 0) C)) N 00 N- CO W 0 N- N- N- N- N N- N- OD co CO CO OD 00 CO CO CO CO CD CD CD 0) > 0 CO 00 CO CO CO OD OD 00 CO OD CO OD CO CO CO CO CO CO CO 00 CO O O O UW Z W g Y g 0 5 U o > 0 0 Wcn Y Y N Et Ul to CO N- OO C D CO 01 Tr Tr CO C D OO O — CO O N N Tr N N J U U W CO C D C D C D 0 O — N N C1) N- CO T- N N N01 to N- T- N0/ � J - a s m W Q' Q 01 01 00 M Tr T' T' Tr Tr d' r Tr Lo In to to UD to to 0 CO 0 a Q a W 8 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 U U U J W W U J U O J J J o 43) O w z z z = 0 0 a U U U w O o O Z Q Z LU LU 0- O O v 2 2 2 O ) ca tai) CO (ai) Q O. a O I- _ N to to CO to CO CD VD 01 C) 01 N- 00000OOOTrNTr r- M� O co OD O CD O O O .- N N N- 0O c N N CV C'7 CO N- — N W 0 01 0 0 0 0 0 0 0 0 0 0 0 0 0 UD 0 0 0 0 0 0 UD 0 0 0 ( LI L at 2 2 O v~i o c va) cai) d a. 0 U c .2 LL LL LL U) O (� u) u) u) u) u) u) (n (n (n u) On 0) U) 0) 00 U)iEL as a as a a a a a a a a a a a as • 00mmmmmmmmmmmmmmmmmmm Q 0 C) d a • o � CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO COCO V- '''. 0.• N N 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 W J J Z O � ‹ NCV NNCV NNNNNNNNNCVCVNNNN ZZ �- D 1. < V W LL 6 T- T- 07 M 01 01 01 00 01 OD 01 01 01 01 01 01 01 01 07 M 01 CO O W W O W JJ O W J 0 LU Q T CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO Cfl a O 0 J 0 H J J D -I CC 0_ O CO O E D E W -10c7 d W W < < Y10_ COC/) ti (T_ LL C/) 0_ a) co co CD CD CD CD CD CD CD CD CD CD CD CD CD CD CD CD CD CD CD CD O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 • o) o) a) o) w o) o) o) CD CD co a) o) o) CD C) o) o) o) o) a) o) CO a a a 0 u_ U_NU' LU a 0000000000000000000000 a s CO m LLU U) (/) 0_ m IP . 70 / IL O / ? 0 R a_ 0 2 m 0 0 I- 00 / ¥ R _i ¥ , a) 2 LLI w \ \ O / k R w EJ: L 3 Z $ w w 0 L 0 L 0 :Sm .., IL ® 0 Oa) N— 0 0 b & w E ' _ � & W (Ni cc kCL H CD 0 0 0 W-J ( O b 0 m _ w Ni 0 / / eo 01 Jtwo 0 0 o eL < , m ru ■ / w % o CV cij ( o - ' LU 0 < < < \ ct § >- < 413c° 0 1- 0%I - 0 0 0 2 < _ / _cq 2 = - d L & w i- lia E < ' ' % CO W 03 CL 1- 2 2 k / < E m / / o w o 1- -J III D _ CL o o d - \ A �$ O 0 O z E ® p / E » ., g ; 1- 2 2 cc L / 2 % = 1- �jo\ % 2 /3 , co q \ w E ƒ � � Sam uOP % 0U_ « k U / 0 'a 2 Nr o - 0 0 L 9 0 = 66. _ 41- n t 4 0 0 2 2 : CL- % 0 L L 0 Z 1" K K E * 4— / < W D / 2 0 N Z \ : = ?.,' "> w w O z 7 n n mo I W => L) � Qb / 2NL 1_ 2 Z z < up >, 7Rz % ro � R �zklYQ / 2 ww / \ \ � m / 001-30 ._ 0 < -....,f E a = 0 2 < < _ . < ' ¥ 0 (.9 .,"_ — 2 R Lu 6 « D \ \ \ w a O 0 0 « 0 w o - o w 2owc) LU & m •- n = n - • o ° = 0 > 2 $ � � k & H < = � Ni ? Ni74 \ # w & 220 = @ Ra2 20 - o . o n17a 2 O x - O 2 C) q@ _ .. k 2 UJ 63 3 y- R T- 2 6 o W aw222 r2 = O w22 2 _J w R 42 � , _Iou- W ow — IIWZ O — X < I < = " O f : W0w � \ w � _IA2 & 00 U � % w ± eEEw � 0 oI � 0 WF—rLi_ NroWf0wk ® d % co = a % 3 % 3 3 \ = � § 2U ■ 2 KOQQK _ K2 � / -- 23b � R RDW jWZ ' Gt2g � R @ � � @ : 2 : : E2 : G / : k W R CL : : 2 Of Q Of 0 2 Q e : 0z - o0 L < m o 0 0 (0 3 0 0 0 0 cn ® 7 0 % % / ^ � ^ / / 2 > - r � © $ $ + a < TIS= 6"C1YY • S NOTES: IA SQZ 04/20/97. '"'CHROME TBG& ACTUATOR= FMC 09-09 LHR'"" ACTUAaOR= BAKER C t INIAL KB.Et.EV= 54' BF ELEV= I LI KOP= 3033' Max Angle= 45°@ 4833' Datum MD= 10479 20"COND H 77 2208' H 7"CAM BAL O SSSV NP D=5.937" Datum ND= 8800'SS 13-3/8"CSG,72#,MN-80,D=12.347" H 2726' 3005' —{7"X 5-1/2"XO,D=4.892" 7"TBG,26#,L-80,13CR,.0383 bpf,D=6.276"y-I 3005' I -- / GAS LFT MANDRELS ST MD TVD DEV TYPE VLV LATCH PORT DATE Ui 3017 3016 10 MC-FMFD DOME RK 16 05/22/14 2 5339 4966 44 MGFMFD SO RK 26 05/22/14 Minimum ID = 3.00" @ 9900' 3 7311 6389 43 MGFMFD DM' RK 0 09/19/10 3-1/2"ALPHA SOFT SET PATCH 4 8422 7208 42 MC-FM-IDDMY RKo 01/31/94 5 8971 7623 40 MC-FM-D DMY RK 0 04/01!96 6 9433 7984 38 PC-FM-10 OM1' RK 0 07/23/91 7 9809 8286 35 MGFMFD DMY RK 0 04/26/97 8 9924 8381 34 MC-FMFD DMY RK 0 02/02/94 ESTIMATED TOP OF CEMENT(04/20/97) H 9809' 111._ -_ ��� 9900' —3-1/2"CHROME ALPHA SOFT SET PATCH 1/ ti ID=3.00"(04/23/94) 1/4 - v 144._ - 5-1/2"TBG,17#,L-80,13CR,.0232 bpf,D=4.892' —{ 10036' ,1T• ,�') 10036' H5-1/2"X 4-1/2"XO,D=3.958" AVA� 1.1.1 '4 10039' H9-5/8"X 4-1/2"BKR MODEL 0 PKR,OD=4.75" TOP OF r LNR-SCAB H 10081' Hs 4-1/2"TBG,12.6#,L-80,13CR, H 10161' I f 10149' H4-1/2-OTIS XN NP,D=3.725" .0152 bpf,D=3.958" 10161' H4-1/2"W.EG,D=3.9558" / ‘ PERFORATION SUMMARY 10144' H RM)TT LOGGED 07/29/91 FEF LOG:BRCS ON 11/30/76 ANGLE AT TOP PBZF:30°@ 10382' • —10396 H TOP OF CBMENIT(06/13/16) Note:Refer to Production DB for historical perf data 'Q _j„- SIZE SPF INTERVAL Opn/Sqz SHOT SQZ 10404' —2-1/8"PDSISET PLUG(06/12/16) 2-1/2" 6 10382-10397 0 11/11/10 — 3-1/8" ? 10387-10397 S 06/25/86 2-1/2" 6 10405-10423 C 11/11/10 • 2-1/2" 6 10408-10416 C 10/01/04 3-1/8" ? 10411-10430 S 06/25/86 10492'ELMD H TOP OFCE EIsIT(11/11/10) 2-1f2" 6 10424-10434 C 11/11/10 ...........e 3-1/8" ? 10474-10477 S 06/25/86 10502' 12-1/8"POSkiET PLUG(11!08!10) 3-1/8" ? 10484-10490 S 06/25/86 = 3-3/8" 2 10518-10520 C 07/12/92 3-3/8" 1/8 10519- 10528 C 10/04/90 3-3/8" 2 10526-10530 C 07/12/92 ir * ?? -1FISP-1.2 BP ELEMENTS 3-1/8" ? 10529-10553 S 07/21/91 8 STFF8NE2(03/26/10) ? ? 10564-10614 C 10/17/88 _ 3-3/8" 4 10569-10622 C 08/01/91 6 3-3/8" 4 10627- 10634 S 10/10/86 ? _ 7 10632-10667 C 10/17/88 7"LHR:SCAB,26#,L-80, H 10691' 13CR,.0383 bpf,D=6.276" TATA'A'A'1TATA'A'A'1 9-5/8"CSG,47#,MN-80,ID=8.681" --{ 10780' 146461446661������� DATE REV BY COMMENTS DATE REV BY COMMENTS FRUDHOE BAY UNIT 12/15/76 ROWAN 34 ORM COMPLETION 04/14/14 DU/JMD TREE GO(04/09/14) WELL: 09-09 07/23/91 LAST WORKOVB2 05/28/14 STF/.HMD GLV C/O(05/22/14) PB2MT No:9760760 08/14/11 IMF/PJC TOC/PATCH CORRECTIONS 06/14/16 CJS/JVD SET PLUG/CMT(06/12-13/16) API No: 50-029-20232-00 09/18111 SWC/PJC GLV C/0(08/29/11) SEC 1,T10N,R15E 1698'FSL 8.01'FWL 03/04/13 JMJM3 GLV C/O(03/02/13) 04/09/14 CJWJMD GLV C/O(03/15/14) BP Exploration(Alaska) bp RECEIVED 0 AUG E 12014 AoGcc BPXA WELL DATA TRANSMITTAL Enclosed are the materials listed below. (BPXA LOG DATA) Date 21 -Aug -2014 Transmittal Number: 93373 If you have any questions, please contact Doug Dortch at the PDC at 564-4973 Contents 1 CD-ROM Containing OPEN HOLE Digital Log Data: 01-14, 03-20, 04-03, 04-09, 04-10, 04-24, 06-03, 06-04, 06-04A, 09-01, 09-02, 09-03, 09-04, 09-05, 09-08, 09-09, 09-10, 09-11, 09-12, 09-13, 09-14, 09-15, 09-16, 09-17, 09-18, 09-19, 09-20, 14-26, 16-07, A-031 B-111 B-241 B-251 C-10, L2 -07A, 0-02, M-041 M-05, U-14 The information on this CD is to be used for BP Exploration (Alaska) Inc. business only. If you are not the owner or licensed user of this CD, any disclosure, copying or use of the A information on this CD is prohibited. If you obtain this Angela K. CD by error, please return the CD to the address shown g below. BP will pay the postage. Thank you. Please Sign and gancpdc@bp.com Doug Dortch Petrotechnical If found please return CD to: BP Exploration PO Box 196612 Anchorage, AK 99519-6612 by 0 =or External Distribution ..., Attn: State of Alaskd� CD 1 of 1 - Attn: Makana Bender, � BPXA OH Log Data 333 W. 7th Ave, Suite 1 01-14, 03-20, 04-03, 04-09, 04-10, 04-24, 06-03, 06-04, e, Anchors Alaska 99501 06-04A, 09-01, 09-02, 09-03, 09-04, 09-05, 09-08, 09-09, Anchorage, 09-10, 09-11, 09-12, 09-13, 09-14, 09-15, 09-16, 09-17, 09-18, 09-19, 09-20, 14-26, 16-07, A-03, B-11, B-24, B-25, �:. C-10, L2 -07A, 0-02, M-04, M-05, U-14 18 -AUG -2014 Petrotechnical Dataen-ter -2-1 900 E. Benson Blvd. PO Box 196612 Anchorage, AK 99519-6612 r 177-077 183-101 171-005 176-030 176-042 185-301 175-073 175-062 200-102 175-076 176-016 176-035 176-040 176-047 176-070 176-076 176-082 176-084 177-007 177-008 177-025 177-036 177-037 177-038 177-039 177-040 177-041 181-110 185-204 171-038 178-069 182-140 182-151 179-035 204-053 186-154 171-023 176-110 193-100 Originated: Schlumberger PTS - PRINT CENTER 2525 GAMBELL STREET, STE. 400 ANCHORAGE, AK 99503 (907) 273-1700 main RECEIVED JUL 0 9 2014 Delivered to: ,%IMakanaK Bender Natural Resources Technician II Alaska Oil & Gas Conservation Commission 333 W. 71" Ave. Suite 100 Anchorage, AK 99501 C7 (V- 0-1 TRANSMITTAL DATE 9 -Jul -14 TRANSMITTAL # ' DATA LODGE D `1/%0/2014 M K BENDER WELL NAME.Ali.- 03-29 - SERVICE ORDER #4&11 CODG-00032 FIELD NAAL4ERVICE PRUDHOE BAY DESCRIPTION• WL PERF DATA FINAL FIELD DATE LOGG 2 -Jun -14 • • 1 1 04-40 _ CV6H-00020 PRUDHOE BAY WL LEAK FINAL FIELD 26 -May -14 1 1 11-32 _ CODG-00031 PRUDHOE BAY WL PERF FINAL FIELD 31 -May -14 1 1 17-13A CFGK-00074 PRUDHOE BAY WL JEWELRY FINAL FIELD 13 -Jun -14 1 1 18-09B _ CRR3-00024 PRUDHOE BAY WL TUB CUT FINAL FIELD 15 -Jun -14 1 1 B -33A CBBZ-00105 PRUDHOE BAY WL IBP FINAL FIELD 24 -May -14 1 1 J -17D CFGK-00075 PRUDHOE BAY WL GR/CCL FINAL FIELD 14 -Jun -14 1 1 J -22A C4W7-00125 PRUDHOE BAY WL PATCH FINAL FIELD 16 -Jun -14 1 1 L1-01 CBBZ-00109 LISBURNE WL TUB CUT FINAL FIELD 29 -May -14 1 1 N-19 C2JC-00150 PRUDHOE BAY WL LEAK FINAL FIELD 13 -Jun -14 1 1 N-19 C2JC-00150 PRUDHOE BAY WL PLUG FINAL FIELD 12 -Jun -14 1 1 P-24 C4W7-00126 PRUDHOE BAY WL PATCH FINAL FIELD 17 -Jun -14 1 1 P-28 CODG-0037 PRUDHOE BAY WL PERF FINAL FIELD 6 -Jun -14 1 1 S -02A CYCD-00008 PRUDHOE BAY WL TUB CUT FINAL FIELD 30 -May -14 1 1 S-104 CRR3-00023 PRUDHOE BAY WL LEAK FINAL FIELD 14 -Jun -14 1 1 09-09 _ C4W7-00123 PRUDHOE BAY WL PPROF FINAL FIELD 4 -Jun -14 1 1 17-13A CFGK-00074 PRUDHOE BAY MEMORY IPORF FINAL FIELD 13 -Jun -14 1 1 C -17B CV6H-00021 PRUDHOE BAY MEMORY PPROF FINAL FIELD 2 -Jun -14 1 1 E -02B ClSD-00116 PRUDHOE BAY MEMORY PPROF FINAL FIELD 29 -May -14 1 1 J -17D CFGK-00075 PRUDHOE BAY MEMORY PPROF FINAL FIELD 14 -Jun -14 1 1 18-11B C2JC-00148 PRUDHOE BAY WL USIT FINAL FIELD 9 -Jun -14 1 1 18-11B C2JC-00147 PRUDHOE BAY WL USIT FINAL FIELD 5 -Jun -14 1 1 Transmittal Receipt A Transmittal Receipt signature confirms that a package (box, ,nn envelope, etc.) has been received and the contents of the package have been verified to match the media noted above. The specific Print Name Signature Date content of the CDs and/or hardcopy prints may or may not have been verified for correctness or quality level at this point. Please return via courier or sign/scan and email a copy to Schlumberger. (907) 561-8317 fax SCANNED Wallace, Chris D (DOA From: AK, D&C Well Integrity Coordinator [AKDCWeIlintegrityCoordinator@bp.comj Sent: Saturday, January 11, 2014 2:36 PM To: AK, OPS FS2 OSM; AK, OPS FS2 DS Ops Lead; AK, OPS FS2 Facility OTL; AK, OPS PCC EOC TL; AK, D&C Wireline Operations Team Lead; AK, D&C Well Services Operations Team Lead; Cismoski, Doug A; AK, RES GPB East Wells Opt Engr; Igbokwe, Chidiebere; AK, OPS EOC Specialists; Daniel, Ryan; AK, RES GPB West Wells Opt Engr; G GPB FS2 Drillsites; Wallace, Chris D (DOA); Regg, James B (DOA) Cc: AK, D&C DHD Well Integrity Engineer; AK, D&C Well Integrity Coordinator; AK, D&C Projects Well Integrity Engineer Subject: UNDER EVALUATION: Producer 09-09 (PTD #1760760) OA exceeded MOASP Attachments: Producer 09-09 TIO Plot 01-11-14.docx; 09-09 Wellbore Schematic.pdf All, Producer 09-09 (PTD # 1760760) OA exceeded MOASP on January 08, 2014 with TBG/IA/OA = 320/1680/1150 psi, indicating a potential lack of competent barriers. At this time the well has been reclassified as Under Evaluation and may remain online for further diagnostics. Plan Forward: 1. DHD: Perform a warm Outer Annulus Repressurization Test 2. Cameron: Confirm wellhead integrity with a PPPOT-IC A copy of the TIO plot and wellbore schematic have been included for reference Please call with any questions. Thank you, Laurie Climer (411ornate. Jack Disbrow) BP Alaska - Well Integrity Coordinator SWOD 9 N14, G] / &ooa dve is Y Y orgarozat:ori WIC Office: 907.659.5102 WIC Email: AKDCWeIlintegrityCoordinator@BP.com Producer 09-09 (PTD #1760760) TIO Plot 01/11/2014 �ng t w � on ow — N TREE = ' FMC GEN 1 WaE'HFAD= FMC ACTUATOR = BAKER C KTIAL IB. ELEV = 54' _ BF. ELJIA _ KOP= 3033' Max Angle = 45` @ 4833' �_. Datum MD = 10479' 20" COND Datum ND= 8800' SS 13-318" CSG, 72#, MN -80, D = 12.347" — 7" TBG, 26#, 1.-80, 13CR..0383 bpf, D = 6.276" �- 2726' 3005' Minimum ID = 3.00" @ 9900' 3-112" ALPHA SOFT SET PATCH ESTAMTED TOP OF CEMENT (04/20/97) 1- j 9809' 1 5-1/2" TBG, 17#, L-80, 13CR 0232 bpf, D=4.892" 1-1 10036' TOP OF 7" LNR - SCAB I 10081' 4-1/2" TBG, 12.6#, L-80, 13CR, 10161' .0152 bpf, D = 3.958" PERFORATION SU%4ARY RT LOG: BHCS ON 11/30%/6 ANGLE AT TOP PELF: 30° @ 10382' Note: Refer to Production DB for historical perf data SIZE SPF INTERNAL Opn/Sgz DATE 2-112" 6 10382 - 10397 O 11/11/10 3-118" ? 10387 - 10397 S 06/25/86 2-1/2" 6 10405 - 10423 O 11/11/10 2-112" 6 10408 - 10416 O 10/01/04 3-1/8" ? 10411 - 10430 S 06/25/86 2-112" 6 10424- 10434 O 11/11/10 3-1/8" ? 10474 - 10477 S 06/25/86 3-1/8" ? 10484 - 10490 S 06/25/86 3-3/8" 2 10518 - 10520 9433 07/12/92 3-3/8" 1/8 10519 - 10528 (: 10/04/90 3-318" 2 10526 - 10530 35 07/12/92 3-1/8" ? 10529- 10553 S 07/21/91 ? ? 10564 - 10614 DMY 10/17/88 3-3/8" 4 10569 - 10622 !; 08/01/91 3-3/8" 4 10627- 10634 S 10/10/86 ? ? 10632 - 10667 10/17/88 7" LNR-SCAB, 26#, L-80,10691' 13CR, .0383 bpf, D = 6.276" 9-5/8" CSG, 47#, MN -80, D = 8.681" 1 10780' SAFETY NOTES: IA SQZ 04/20197. —CHROME TBG & LNR — 2208' 1-� 7" CAM BAL-O SSSV NF, D = 5.937- 3005' —{ 7" X 5-1/2- XO, D = 4.892" GAS LFT MANDRELS ST MD TVD DEV TYPE I VLV LATCH I PORT DATE 1 3017 3016 10 M -FMI-D DOKE RK 16 03/02/13 2 5339 4966 44 M -FMHD SO RK 24 03/02/13 3 7311 6389 43 MC-FMI-fl DMY RK 0 09/19/10 4 8422 7208 42 M -FMHD DMY RK 0 01/31/94 5 8971 7623 40 MGFMHD DMY RK 0 04/01/96 6 9433 7984 38 MGFMI-D DMY RK 0 07/23/91 7 9809 8286 35 MC-FMHD DMY RK 0 04/26/97 8 1992418381 34 MC-FMHD DMY RK 1 0 02/02/94 9900' 3-1/2" CHROME ALPHA SOFT SET PATCH COMMENTS DATE REV BY COMMENTS D= 3.00" (04123194) ROWAN 34 ORIG COM PLEnON 08/14/11 MJF/ PJC TOC / PATCH CORRECTIONS 10036' 5-1/2" X 4-1/2" XO, ID —=3--958--] 10039' 09/18/11 SWC/ PJC GLV C/O (08/29/11) 9-5/8" X 4-112" BKR MODB D PKR OD = 4.75" JKC/TLH 13P SET (05/10/09) 10149' 4-1/2" OTIS XN NF', ID= 3.725" 10161' 4 1/2" WLEG, D = 3.958" 10144' ELMD TT LOGGED 07/29/91 10492' ELMD TOPOF C&AE NT 01/11/10) 10502' 2-1/8" POSISET FLUG (11/08/10) ?? 11 FISH-2 BP ELEMENTS & STFFE NER (03/26/10) DATE REV BY COMMENTS DATE REV BY COMMENTS 12/15/76 ROWAN 34 ORIG COM PLEnON 08/14/11 MJF/ PJC TOC / PATCH CORRECTIONS 07/23/91 LAST WORKOVE R 09/18/11 SWC/ PJC GLV C/O (08/29/11) 06/01/09 JKC/TLH 13P SET (05/10/09) 03/04/13 JIWJMD GLV CIO (03/02113) 03/29/10 SWC/PJC PULL BP/ FISH (03!26110) 09/21/10 TAR/PJC GLV C/O (09/19/10) 11/15/10 TTW/PJC POSISET/ PEWS (11/11/10) PRUDHOE BAY UNIT WILL: 09-09 PERMIT No:'1760760 AR No: 50-029-20232-00 SEC 1, T10N, R15E , 1698' FSL &.01' FWL BP Exploration (Alaska) 12/10/10 Schhodener NO. 5658 Alaska Data 8 Consulting Services Company: State of Alaska 2525 Gambell Street, Suite 400 Alaska Oil 8, Gas Cons Comm Anchorage, AK 99503 -2838 Attn: Christine Shartzer ATTN: Beth 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Well Job # Log Description Date BL Color CD MPF -13 BDAD -00024 USIT / 1 j--- (a;.,) 09/29110 1 1 q9 p5/ Co NK-65A BCRD -00064 INJ PROFILE/RST/WFL g 0,5 - h( j 10/21/10 1 1 ...765 /6 S-41A BCRD-00058 USIT j () /(? 09/24/10 1 1 1 1 s 6, ( /, 1- 15IP -25 6350 -00096 - SCMT / '3 — 10/31/10 W -219 BGZ7 -00012 USIT ,a/ /GS 11/22/10 1 1 (-,$ / 09 -09 BCRD-0006 RST j (� '� 10/14/10 1 1 0$1 01-02 BCRD -00066 RST / (p —(/ aj 10/26/10 1 1 05 -338 BAUJ -00042 MCNL /O— ?l( 08/28/10 1 1 A (� 05 -316 10AKA0071 OH MWD /LWD EDIT a --01,-T 08/30/10 2 _ 1 0, ( I • PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO: BP Exploration (Alaska) Inc. Alaska Data & Consulting Services Petrotechnical Data Center LR2 -1 2525 Gambell Street, Suite 400 900 E. Benson Blvd. Anchorage, AK 99503 -2838 • viiiiiwo 4 'LOA C I 0 ,^' ' �^ �f "` 0 A ' A CA STATE OF ALASKA • ALASAL AND GAS CONSERVATION COMMISSI REPORT OF SUNDRY WELL OPERATIONS 1. Operations Abandon ❑ Repair Well ❑ Plug Perforations ❑ Stimulate Other Q POSISET PLUG Performed: Alter Casing ❑ Pull Tubing ❑ Perforate New Pool ❑ waiver[:] Time Extension ❑ Change Approved Program ❑ Operat. Shutdown ❑ Perforate Re -enter Suspended Well ❑ 2. Operator BP Exploration (Alaska), Inc. 4. Well Class Before Work: 5. Permit to Drill Number: Name: Development ❑r Exploratory ❑ 176 -0760 3. Address: P.O. Box 196612 Stratigraphic❑ Service ❑ 6. API Number: Anchorage, AK 99519 -6612 -50- 029 - 20232 -00 -00 8. Property Designation (Lease Number) : Ir 9. Well Name and Number: ADLO- 028327 PBU 09 -09 10. Field /Pool(s): PRUDHOE BAY FIELD / PRUDHOE OIL POOL 11. Present Well Condition Summary: Total Depth measured 10800 feet Plugs (measured) None feet true vertical 9132.85 feet Junk (measured) UNKNOWN feet (3/26/10) Effective Depth measured 1069 feet Packer (measured) 9900 9917 10039 feet true vertical 9038 feet (true vertical) 8361 8375 8477 feet Casing Length Size MD TVD Burst Collapse Structural Conductor 80' 20" 91.5# H-40 31 - 111 31 - 111 1490- 470 Surface 2696' 13- 3/8 "72# MN -80 30 - 2726 30 - 2726 5380 2670 Production 2245' 9 -5/8" 47# SOO -95 29 - 2274 29 - 2274 8150 5080 Production 6977' 9 -5/8" 47# MN -80 2274 - 9251 2274 - 7840 6870 4760 Production 1529' 9 -5/8" 47# R -S -95 9251 - 10780 7840 - 9115 8150 5080 Liner 610' 7" 29# L -80 10081 - 10691 8513 - 9038 8160 7020 Perforation depth: Measured depth: SEE ATTACHED - True Vertical depth: Tubing: (size, grade, measured and true vertical depth) 7" 17# L -80 SURFACE - 3005 SURFACE - 3004 5 -1/2" 17# L -80 3005 -10039 3004 -8477 4 -1/2" 12.6# L -80 10039 -10161 8477 -8581 Packers and SSSV (type, measured and true vertical depth) 3 -1/2" DWP Patch Packer 9900 8361 3 -1/2" DWP Patch Packer 9917 8375 4 -1/2" Baker Model D Packer 10039 8477 A1VE 12. Stimulation or cement squeeze summary: Y O 1 Intervals treated (measured): x ����N�V 1 2010 g -� _�- � }� � Treatment descriptions including volumes used and final pressure: U d & Gal Cons. tli �EK "JSi dfl AnC ora Q 13. Representative Daily Average Production or Injection Data Oil -Bbl Gas -Mcf Water -Bbl Casing Pressure Tubing pressure Prior to well operation: 95 29 11200 351 Subsequent to operation: 14. Attachments: 15. Well Class after work: Copies of Logs and Surveys Run Exploratory❑ Development 0 Service ❑ Stratigraphic ❑ Daily Report of Well Operations X 16. Well Status after work: Oil d Gas WDSPL GSTOR ❑ WINJ ❑ WAG[ GINJ ❑ SUSP❑ SPLUG ❑ 17. 1 hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt: NA Contact Joe Lastufka Printed Na Jo Last < Title Data Manager Signatur Phone 564 -4091 Date 11/12/2010 Form 10 -404 Revised 10/2010 RBDMS NOY 15 10'� yC.� r` •�S fO Sub Original Only QQ �ll/ 09 -09 176 -076 PERF ATTACHMENT Sw Name Operation Date Perf Operation Code Meas Depth Top Meas Depth Base Tvd Depth Tor Tvd Depth Base 09 -09 5/17/77 PER 10,385. 10,395. 8,772.74 8,781.37 09 -09 5/17/77 PER 10,409. 10,434. 8,793.47 8,815.09 09 -09 5/17177 PER 10,473. 10,476. 8,848.88 8,851.48 09 -09 5/17177 PER 10,483. 10,489. 8,857.55 8,862.75 09 -09 5/17/77 PER 10,517. 10,521. 8,887.04 8,890.51 09 -09 5/17177 PER 10,528. 10,552. 8,896.59 8,917.41 09 -09 6/25/86 SQZ 10,385. 10,552. 8,772.74 8,917.41 09 -09 7/11/86 APF 10,564. 10,614. 8,927.82 8,971.14 09 -09 7/11/86 APF 10,627. 10,632. 8,982.41 8,986.74 09 -09 11/8/86 RPF 10,564. 10,614. 8,927.82 8,971.14 09 -09 11/8/86 RPF 10,627. 10,632. 8,982.41 8,986.74 09 -09 10/17/88 RPF 10,564. 10,614. 8,927.82 8,971.14 • 09 -09 10/17/88 RPF 10,627. 10,632. 8,982.41 8,986.74 09 -09 1/4/90 RPF 10,528. 10,552. 8,896.59 8,917.41 09 -09 1/4/90 RPF 10,517. 10,521. 8,887.04 8,890.51 09 -09 7/21/91 SQZ 10,385. 10,632. 8,772.74 8,986.74 09 -09 8/1/91 APF 10,614. 10,622. 8,971.14 8,978.07 09 -09 8/1/91 RPF 10,572. 10,614. 8,934.76 8,971.14 09 -09 7/11/92 RPF 10,518. 10,520. 8,887.91 8,889.64 09 -09 7/11/92 APF 10,526. 10,528. 8,894.85 8,896.59 09 -09 7/11/92 RPF 10,528. 10,530. 8,896.59 8,898.32 09 -09 10/1/04 APF 10,408. 10,416. 8,792.6 8,799.52 09 -09 5/11/09 BPS 10,558. 10,564. 8,922.62 8,927.82 09 -09 3/26/10 BPP 10,558. 10,564. 8,922.62 8,927.82 09 -09 11/8/10 BPS 10,502. 10,632. 8,874.03 8,986.74 09 -09 11/9/10 SPS 10,502. 10,517. 8,874.03 8,887.04 09 -09 11/11/10 APF 10,405. 10,423. 8,790.01 8,805.57 09 -09 11/11/10 APF 10,382. 10,397. 8,770.16 8,783.1 09 -09 11/11/10 APF 10,424. 10,434. 8,806.44 8,815.09 AB ABANDONED PER PERF • APF ADD PERF RPF REPERF BPP BRIDGE PLUG PULLED SL SLOTTED LINER BPS BRIDGE PLUG SET SPR SAND PLUG REMOVED FCO FILL CLEAN OUT SPS SAND PLUG SET FIL FILL I SQF SQUEEZE FAILED MIR MECHANICAL ISOLATED REMOVE SQZ SQUEEZE MIS MECHANICAL ISOLATED STC STRADDLE PACK, CLOSED MLK MECHANICAL LEAK STO STRADDLE PACK, OPEN OH JOPEN HOLE 09 -09 DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS EVENT SUMMARY 11/7/20101 ** *WELL FLOWING UPON ARRIVAL * ** (ELINE: PLUG, CMT DUMP, PERF) EQUIPMENT SPOTTED, BEGIN RIG UP, UNABLE TO FREEZE PROTECT, LAY LUB BACK DOWN, RETURN TOMORROW. ** *WELL FLOWING UPON DEPARTURE, JOB INCOMPLETE * ** I o a E ' i 11/7/20 NO Freeze Protect TBG & F/L (Pre E -line work). Pumped 96 bbls o crude down TBG to displace. Pumped 7 bbls neat meth followed by 53 bbls crude down the flowline to freeze protect. Pressured up flowline to 1500 psi w/ 2.2 bbls neat **Tags Ta shun and wellhead valves left in the following positions: SV & WV =S /I. 9 9 5P SSV, MV, A/L & OA left open. ** FWP's= 1300/1980/0 3 3 11/8/2010 ** *WELL SHUT -IN UPON ARRIVAL * ** (ELINE: PLUG, CMT DUMP, PERF) INITIAL T /1 /0= 1950/1950/0. SET TOP OF 2 -1/8" POSSISET PLUG IN 7 INCH SCAB LINER AT 10502'. DUMP TWO RUNS OF CMT ( -5', -8 GAL). LAY DOWN RETURN 1 TOMORROW. M =O, SSV =C, W =C, CSG =OTG. FINAL T /1 /0= 1950/1950/0. ** *WELL SHUT -IN UPON DEPARTURE, JOB INCOMPLETE * ** E i � 3 l i 11/9/20 0 * *JOB CONTINUED FROM 8- NOV- 2010 * ** WELL SHUT -IN UPON ARRIVAL. ( ELINE: PLUG, CMT DUMP, PERF) 1 INITIAL T /1 /0= 1950/1950/0. jDUMP ONE RUN OF CMT ( -2.5', -4 GAL). LAY DOWN TO LET CMT HARDEN l ( RETURN TOMORROW FOR PERF j M =O, SSV =O, W =C, CSG =OTG. FINAL T /1 /0= 1950/1950/0. ** *WELL SHUT -IN UPON DEPARTURE, JOB INCOMPLETE * ** 3 • ' I 11/11 /2010'; ** *CONTINUE JOB FROM 08 -NOV- 2010 * ** (ELINE: PERF ?WELL SHUT -IN UPON ARRIVAL. INITIAL T /1 /0= 2000/1950/0 PSI TOC TAGGED AT 10492' ON EACH GUN RUN 1 PERFORATED INTERVALS. 10424'-10434', - 10405 10423 , 10382'-10397', WITH 2 - 11/2" HSD POWER JET, 2506 HMX, 6 SPF, 60 DEG PHASING, API DATA: - - PENETRATION - 25.2 ,ENTRANCE HOLE - 0.32. A LL DEPTHS REFERENCED I 3 1 TO CAMCO COLLAR LOG DATED 29- JULY -1991. ?SSV - CLOSED, FINIAL T /I /O = 2000/2000/0 1WELL SHUT -IN ON DEPARTURE, DSO NOTIFIED JOB COMPLETE * ** FLUIDS PUMPED BBLS 16 METH 149 CRUDE 5 DIESEL 170 TOTAL TREE = FMC GEN 1 WELL = _ FMC SAFETY : IA SOZ 04/20/97. CHROMETBG AND ACTUATOR = BAKER C 09-09 LNR. KB. ELEV = 54' BF. ELEV = KOP = 3033' Max Angle = 45° @ 4833' Datum MD 10479' 20" CONDUCTOR ?? 2208' 7" CAM BAL -0 SSSV NIP, ID = 5.937" = Datum TV D = 8800' SS 13 -3/8" CSG, 72 #, MN 80, ID = 12.347" 2726' ,4 -- 3 - 00 - 5' --- j — F . T 7 X 5 -1 XO, ID = 4.892" 7" TBG, 26 #, L -80, 13CR, .0383 bpf, ID = 6.276" 3005' GAS LIFT MANDRELS ST MD I TV I DEV TYPE VLV LATCH PORT DATE 1 3017 3016 10 MC -FMHD DOME RK 16 09/19/10 2 5339 4966 44 MC -FMHD SO RK 26 09/19/10 Minimum ID = 3.00" @ 9900' 3 7311 6389 44 MC -FMHD DMY RK 0 09/09/97 3 -1/2" ALPHA SOFT SET PATCH 4 8422 7208 42 MC -FMHD DMY RK 0 01/31/94 5 8971 7623 40 MC -FMHD DMY RK 0 04/01/96 6 9433 7984 38 MC -FMHD DMY RK 0 07/23/91 7 9809 8286 35 MGFMHD DMY RK 0 04/26/97 8 9924 8381 34 MGFMHD DMY RK 0 02/02/94 ESTIMATED TOP OF CEMENT ( ? ?1 ? ?! ? ?) ?? 9900' 1 3- 1 /2 " CHROME ALPHA SOFT SETPATCH ID = 3.00" ( ? ? / ? ? / ? ?) 5 -1/2" TBG, 17 #, L -80, 13CR, .0232 bpf, ID = 4.892" 10039' 10039' 5 -1/2" X 4 -112" XO, ID = 3.958" 10039' 9 -5/8" X 4 -1/2" BKR MODEL D PKR TOP OF 7" LNR - SCAB 10081' 10149' 4 -112" OTIS XN NIP, ID = 3.725" 4 -1/2" TBG, 12.6 #, L -80, 13CR, 10161' .0152 bpf, ID = 3.958" 10161 144' --C4 1/2" WLEG, ID 10 MD TT LOGGED 07/29/91 PERFORATION SUMMARY REF LOG: BHCS ON 11/30/76 ANGLE AT TOP PERF: 30° @ 10529' Note: Refer to Production DB for historical perf data SIZE SPF INTERVAL Opn /Sqz DATE 3 -1/8' ? 10387 - 10397 S 06/25/86 2 -1/2" 6 10408 - 10416 0 10/01/04 3 -1/8" ? 10411 - 10430 S 06/25/86 3 -1/8" ? 10474 - 10477 S 06/25/86 3 -1/8" ? 10484 - 10490 S 06/25/86 3 -3/8" 2 10518 - 10520 0 07/12/92 3 -3/8" 1/8 10519 - 10528 0 10/04/90 ?? FISH -2 IBP ELEMENTS 3 -3/8" 2 10526 - 10530 0 07/12/92 & STIFFENER (03/26/10) 3-1/8" ? 10529 - 10553 S 07/21/91 ? ? 10564 - 10614 C 10/17/88 3 -3/8" 4 10569 - 10622 C 08/01/91 3 -3/8" 4 10627 - 10634 S 10/10/86 ? ? 1 10632 - 10667 C 10/17/88 7" LNR -SCAB, 26#, L -80, 10 - 6 - 9V -- T- 1 1 .0383 bp f, I = 6.2 76" 9 -5/8" CSG, 47 #, MN-80, ID = 8.681" 10780' DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT 12/15/76 ORIGINAL COMPLETION 07/27/07 LJL /SV PERF CORRECTIONS WELL: 09 -09 07/23/91 LAST WORKOVER 06/01/09 JKC/TLH IBP SET (05/10/09) PERMIT No: 1760760 09/23/01 RN/TP CORRECTIONS 03/29/10 SWC/PJC PULL IBP/ FISH (03/26/10) API No: 50- 029 - 20232 -00 09/02/02 BHC/TP PERF CORRECTIONS 09/21/10 TAR/PJC GLV C/O (09/19/10) SEC 2, T20N, R15E, 1294.95' FEL & 1103.75' FNL 10/01/04 JNA/TLP ADD PERF 1 05/30/061 DTM I WELLHEAD CORRECTION I I BP Exploration (Alaska) I 06/08/09 i SC~I~~t'~~' Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 Anchorage, AK 99503-2838 ATTN: Beth Well Job # Log Description N0.5271 Company: State of Alaska Alaska Oil & Gas Cons Comm Attn: Christine Mahnken 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Date BL Color CD H-35 AYTO-00018 s CROSS FLOW CHECK ~ 05/09/09 1 1 14-35 ANHY-00087 _ - INJECTION PROFILE 05/15/09 1 1 O6-OSA AV1H-00012 IBP/FBS/CFS/GRADIO/PRESSIf P 05/11/09 1 1 A-44 AWLS-00017 SCMT 05/25/09 1 1 12-07A BOCV-00016 SBHP SURVEY 05/19/09 1 1 09-24 ANHY-00088 CROSS FLOW CHECK/IBP ~ 05/17/09 1 1 H-29A AYQO-00027 PPROF/RST - 05/19/09 1 1 09-09 AYTU-00032 CROSS FLOW CHECK , 05/06/09 1 1 15-45B ANHY-00010 PRODUCTION PROFILE '~~ 05/09/09 1 1 13-13A AYTU-00033 USIT -- '~~ ' ~ 05/08/09 1 1 M-196 AY3J-00024 PRODUCTION PROFILE 05/14/09 1 1 Z-12 ANHY-00084 INJECTION PROFILE 05/07/09 1 1 E-36A B1JJ-00018 MEM CNL/STP f s 05/18/09 1 1 X-30A 62WY-00005 C MEM PROD PROFILE 05/10/09 1 1 12-23 AYKP-00021 USIT .L - 05/08/09 1 1 W-34A AWJI-00031 MEM PROD PROFILE 05/19/09 1 1 Z-14B AZCM-00022 PROD PROFILE/JEWELRY LOG ~ (~- 05/20/09 1 1 L1-21 82NJ-00006 PRODUCTION PROFILE 05/24/09 1 1 A-31A AZCM-00023 USIT ~ - Q ~ L 05/22/09 1 1 H-19B' B2WY-00004 MEM PROD PROFILE L 05/07/09 1 1 G-16 AYKP-00022 SCMT / / - 05/09!09 1 1 M-19B AY3J-00024 SCMT - 05/15/09 1 1 12-37 AWL9-00032 PRODUCTION PROFILE G/!a ~ 04/21/09 1 1 11-04A AYOO-00028 USIT /~e/- 05/21/09 1 1 18-30 B1JJ-00015 MEM PROD PROFILE JG/ 05/13/09 1 1 4-14A/S-37 AYKP-00024 PRODUCTION PROFILE ~j - - t 05/11/09 1 1 3-37/L-35 AWL9-00035 PROD/INJECTION PROFILE 05/22/09 1 1 3-37/L-35 AWL9-00035 TEMPERATURE SURVEY 05/20!09 1 1 V-217 AYOO-00024 INJ PROFILE/RST WFL ~ /~lJ 04/26/09 1 1 YLtAJt AI:KNUWLtU(at Fitt:tlF'1 CT ,1(aNIN(a AIVU F(tl UFfIVINIi Urvt ~;VY1f CALM I U: BP Exploration (Alaska) Inc. Petrotechnical Data Center LR2-1 ~ 1 t~f.'j 1 j ~~~ -~ ry~~~ 900 E. Benson Blvd. ~ L. Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 Anchorage, AK 99503-2838 Scblumberger RECEIVED NO. 3907 Alaska Data & Consulting Services 2525 Gambell Street, Suite 400 Anchorage, AK 99503-2838 ATTN: Beth I~UG 1 0 Z006 Company: State of Alaska Alaska Oil & Gas Cons Comm Attn: Christine Mahnken 333 West 7th Ave, Suite 100 Anchorage, AK 99501 ~aska Oil & Gas Cons. Commission Anchorage l-=t-r:ø - 07-6 SCl,NNED q: 'G 'j lL t.."'·on;~ , ,'J,., ~¿ ~'M . .. vV Field: Prudhoe Bay Well Job# LOQ DescriDtion Date BL Color CD 02-166 11209601 04/25/06 1 lö-21 1122105!! UKVI:Y 04/03/06 1 16-01 1105228 INJECTION PROFILE 07/21/05 1 16-01 10980601 INJECTION PROFILE 08/15/05 1 D.S 11-08 11223100 INJECTION PROFILE 02/27/06 1 D.S. 02-26C 11223117 LDL 05/16/06 1 09-09 11211484 PROD PROFILE W/DEFT 04/28/06 1 18-33A 11258719 LDL 06/08/06 1 X-07A 11217272 USIT 08/05/06 1 D-03A 11243918 SCMT 06/02/06 1 D-03A 11217271 USIT 08/04/06 1 Z-19 11217273 US IT 08/06/06 1 Petrotechnical Data Center LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99508 Alaska Data & Consulting Services 2525 Gambell Street. Suite 400 Anchorage, AK 99503·2838 ATTN: Beth 08/08/06 . . ) STATE OF ALASKA ) RECEIVED ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATION~CT 2 62004 IUd:')Kij Oil & Gá;) Cõii£. GMfimiss¡cm Stimulate 0 OtherÃŒhorage waiverD Time ExtensionO Re-enter Suspended Well 0 5. Permit to Drill Number: 176-0760 6. API Number 50-029-20232-00-00 1. Operations Performed: Abandon 0 Alter Casing D Change Approved Program D Repair Well 0 PluQ PerforationsD Pull Tubing 0 Perforate New Pool D Operation Shutdown 0 Perforate IKI 2. Operator BP Exploration (Alaska), Inc. Name: 3. Address: P.O. Box 196612 Anchorage, Ak 99519-6612 7. KB Elevation (ft): 54.00 8. Property Designation: ADL-0028327 11. Present Well Condition Summary: Total Depth 4. Current Well Class: Development [!] ExploratoryD ServiceD Stratigraphic D 9. Well Name and Number: 09-09 10. Field/Pool(s): Prudhoe Bay Field / Prudhoe Oil Pool measured 10800 feet Effective Depth true vertical 9132.9 feet Size 20" 91.5# H-40 7" 29# L-80 9-5/8" 47# SOO-95 9-5/8" 47# MN-80 9-5/8" 47# R-S-95 13-3/8" 72# M N-80 Plugs (measured) None Junk (measured) None MD TVD Burst Collapse 31 111 31.0 111.0 1490 470 10081 - 10691 8512.7 - 9038.0 8160 7020 29 - 2274 29.0 - 2274.0 8150 5080 2274 - 9251 2274.0 - 7840.2 6870 4760 9251 - 10780 7840.2 - 9115.4 8150 5080 30 - 2726 30.0 - 2725.9 5380 2670 measured 10692 feet true vertical 9038.9 feet Casing Conductor liner Production Production Production Surface Length 80 610 2245 6977 1529 2696 Perforation depth: Measured depth: 10408 -10409,10409 -10416,10518-10520,10526 -10528,10528 -10530, 10572 -10614,10614 -10622 True vertical depth: 8792.6 - 8793.47,8793.47 - 8799.52,8887.91 - 8889.64,8894.85 - 8896.59,8896.59 - 8898.32,8934.76 - 8971.14 8971.14 - 8978.07 Tubing ( size, grade, and measured depth): Packers & SSSV (type & measured depth): 7" 26# 13Cr80 5-1/2" 17# 13Cr80 3-1/2" 7.7# L-80 4-1/2" 12.6# 13Cr80 3-1/2" DWP Patch Packer 3-1/2" DWP Patch Packer 4-1/2" Baker Model D Packer 7" Camco Bal-O SSV @ 27 @ 3005 @ 9900 @ 10039 @ @ @ @ 3005 10039 9921 10161 9900 1~IcANNED NOV 0 3 2004 2208 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13 Prior to well operation: Subsequent to operation: 14. Attachments: Copies of Logs and Surveys run - Daily Report of Well Operations - X Oil-Bbl 178 134 Representative Daily Average Production or Injection Data Gas-Met Water-Bbl Casing Pressure 0.2 5730 1500 0.2 4169 1900 Tubing Pressure 322 335 15. Well Class after proposed work: ExploratoryD 16. Well Status after proposed work: OilŒ] GasD DevelopmentŒ) ServiceD WAG D GINJD WINJD WDSPLD Prepared by Garry Catron (907) 564-4657. Sundry Number or N/A if C.O. Exempt: N/A Contact 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Garry Catron Printed Name Garry Catron ;j~ C~ Form 10-404 Revised 4/2004 Signature Title Production Technical Assistant Phone 564-4657 Date 10/19/04 nRIG1t\IAI .IØ)MS 8Ft.. OCT ~ II ) ) 09-09 DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS EVENT SUMMARY 10101/04 (PRE ADPERF). LOC TT @ 101111 SLM + 331 = 101441 ELMD.. TAGGED BOTTOM @ 10567' SLM + 331 = 106001 ELMD.. SAMPLE BAILER CAME BACK WI FRAC SAND.. ** TURNED WELL OVER TO DSO TO POp** 10101/04 Perforated 104081-1041616 SPF with 2-1/211X81 HSD PJ-2506 HMX gun. All shots fired. FLUIDS PUMPED BBLS No Fluids Pumped 0 I TOTAL Page 1 ~REE 0:: '" FMC GEN 1 WELLHEAD = CrN ACTUATOR;;; - ---- sÄKER ë 'KEf'ECEV"';-'---'o,--",," ---"~=5¿F ....................... ........ "".... BF. ELEV = -í«5P;"_w_'=-=_V"==--==~o3Ò33i' .. . -.-. ,,,. .~.. ".,,,,,,,.. ...~ ..... . no " . . Max Angle = 45 @ 4833' batumMÖ;" . ..u1Ö479; .......'"«H",,..m. .><.-.,0> ..,,,,,.,,,. ... .. ....., ..... Datum TVD = 8800' SS ') 09-09 ') SAFETY NOTES: IA SQZ 04/20/97. CHROMETBG AND LNR . 2208" l-i 7" CAM BAL-O SSSV NIP, ID = 5.937" 1 113-3/8" CSG, 72#, MN-80, ID = 12.347" l-i 2726" IT' TBG, 26#, L-80, 13-CR, .0383 bpf, ID = 6.276" l-i 3005" ITOPOF 5-1/2" TBG l-i 3005" ~ ~ ~ I 3005" l-i 7" X 5-1/2" XO 1 Minimum ID = 3.00" @ 9900' 3-1/2" ALPHA SOFT SET PATCH L ST MD TVD 1 3017 3016 2 5339 4966 3 7310 6388 4 8422 7208 5 8971 7623 6 9433 7984 7 9809 8286 8 9924 8381 GAS LIFT MANDRELS DEV TYÆ VLV LATCH 1 0 M~FMHD RK 44 M~FMHD RK 44 M~FMHD RK 43 M~FMHD RK 43 M~FMHD RK 43 M~FMHD RK 42 M~FMHD RK 42 M~FMHD RK PORT DATE I 5-1/2" TBG, 17#, L-80, 13-CR, .0232 bpf, ID = 4.892" l-i 10039" I TOP OF 4-1/2" TBG l-i 10039" I TOP OF 7" LNR - SCAB l-i 10081" t---s 14-1/2" TI3G, 12.6#, L-80, 13.CR. .0152 bpI, ID = 3.958" 1-1 10161' ~ l I 9900" l-i 3-1/2" CHROME ALPHA SOFT SET PATCH 1 I 10039" l-i 5-1/2" X 4-1/2" XO J I 10039" l-i 9-5/8" X 4-1/2" BAKER MODEL D PKR 1 I I 10149" 1-i4-1/2" OTIS X LAND NO-GO NIP, ID = 3.725" 1 I 10161" 1-i4-1/2" TUBING TAIL 1 I 10144" I-iELMD TT LOGGED 07/29/91 1 PERFORA TION SUMMARY REF LOG: BHCS ON 11/30/76 ANGLE AT TOP PERF: 30 @ 10529' Note: Refer to Production DB for historical perf data SIZE SPF INTERV A L Opn/Sqz DA TE 3-1/8" ? 10387 - 10397 S 06/25/86 2-112" 6 10408 - 10416 0 10/01/04 3-1/8" ? 10411 - 10430 S 06/25/86 3-1/8" ? 10474 - 10477 S 06/25/86 3-1/8" ? 10484 - 10490 S 06/25/86 3-3/8" 2 10518 - 10520 0 07/12/92 3-3/8" 1/8 10519 - 10528 0 10/04/90 3-3/8" 2 10526 - 10530 0 07/12/92 3-1/8" ? 10529 - 10553 S 07/21/91 ? ? 10564 - 10614 0 10/17/88 3-3/8" 4 10569 - 10619 0 08/01/91 3-3/8" 4 10627 - 10634 S 10/10/86 ? ? 10632 -10667 0 10/17/88 3-3/8" 6 11012 - 11022 0 10/04/04 7" LNR-SCAB, 26#, L-80, -i 10691" ~ 13.CR, .0383 bpf, ID = 6.276" 9-S/S"CSG,47#,MN-80,ID=8.681" l-i 10780" ~ I REV BY DATE 12/15/76 07/23/91 09/23/01 09/02/02 10/01/04 COMMENTS ORIGINAL COM PLETION LAST WORKOVER RNlTP CORRECTIONS BHClTP PERF CORRECTIONS JNAITLP ADD PERF DA TE REV BY COMMENTS PRUDHOE BAY UNIT WELL: 09-09 PERMIT No: 1760760 API No: 50-029-20232-00 SEe 2, T20N, R15E, 1294.95' FEL & 1103.75' FNL BP Exploration (Alas ka) STATE OF ALASKA ' ALASKA OIL AND GAS CONSERVATION COMMISSIuN REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation Shutdown_ Stimulate__ Plugging_ Perforate __ Pull tubing Alter casing _ Repair well _ Other _X 2. Name of Operator: 5. Type of Well: 6. Datum of elavation (DF or KB feet): ARCO Alaska, Inc. Development _X 54' RKB 3. Address: Exploratory_ 7. Unit or Property: P.O. Box 100360 Stratagrapic_ Anchorage, AK 99510-0360 Service_ Prudhoe Bay Unit 4. Location of well at surface: 8. Well number: 1698' FSL, 0' FEL, Sec2, T10N, R15E, UM. 9-09 At top of productive interval: 9. Permit number/approval number: 1126' FNL, 1346' FEL, Sec 1, T10N, R15E, UM. 76-76 At effective depth: 10. APl number: 50-029-20232 At total depth: 11. Field/Pool: 1104' FNL, 1297' FEL, Sec 1, T10N, R15E, UM. Prudhoe Bay Oil Pool 12, Present well condition summary Total Depth: measured 10800 feet Plugs (measured) Tagged PBTD @ 10566' MD (6/1/97). true vertical 9132 feet Effective Depth: measured 10566 feet Junk (measured) true vertical 8930 feet Casing Length Size Cemented Measured depth True vertical depth Conductor 80' 20" 300 Sx AS 107' 107' Surface 2672' 13-3/8" 6100 Sx AS 2726' 2726' Production 10726' 9-5/8" 1000 Sx Class G 10780' 9113' & 300 Sx AS Liner 610' 7" 147 Sx Class G 10691' 9036' Perforation Depth measured 10518-10520'; 10526-10530'; 10572-10622' ORIGINAL true vertical 8887 - 8888'; 8893 - 8895'; 8933 - 8974' Tubing (size, grade, and measured depth) 7", 13 Cr80, Fox @ 3005' MD; 5.5", 13 Cr80, Fox @ 10039' MD; 4.5", 12.6#, 13 Cr80, Fox @ 10061' MD. Packers and SSSV (type and measured depth) Baker D Packer @ 10039'MD; CamcoBaI-OSSSV @ 2208'MD. J~ ECE~V~ 13. Stimulation or cement squeeze summary :.i!.~[':j 6 1997' Intervals treated (measured) see attached 41aska 0il .& Gas Cons, C_.o.m[[t[~ Intervals treated (measured) ~c .h0.rag~l 14. Representitive Daily Average Production or Injection Data OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation Shut-In - - Subsequent to operation 2433 2300 6846 431 15. Attachments 16. Status of well classification as: Copies of Logs and Surveys run _ Daily Report of Well Operations _ X Oil _X Gas _ Suspended _ Service _ 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed '~'~'~.,~ ~ . ~'~ Title: Engineering SupervJsor Date ~'-5- ~'7 Form 10-404 Rev 06/15/88 SUBMIT IN DUPLICATE 9-09 TUBING LEAK CEMENT SQUEEZE DESCRIPTION OF WORK COMPLETED 11/12/96: Performed a Leak Detection Log and saw a leak present at bottom seal of tubing patch at 9940' MD. 11/27/96: RIH & tagged PBTD at 10590' MD. 12/1/96: MIRU CTU & PT equipment. RIH w/CT & loaded the wellbore w/Slick Seawater & Crude, then tagged bottom & pumped gelled sand slurry containing a total of 11,900 lbs of 20/40 mesh sand, to place an isolation sand plug across the open perforation intervals located at: 10518- 10520' MD (Z2) 10526 - 10530' MD (Z2) 10572 - 10622' MD (Z1 B) POOH w/CT leaving an estimated TOS at 10219' MD. 12/3/96: RIH & tagged TOS at 10226' MD. Ref. Log: BHCS 11/30/76. RD. 12/4/96: RIH w/bailer & dumped a CaCO3 Cap on top of sand plug to 10202' MD. 2/22/97: RIH w/CT & tagged TOS at 10232' MD, then PU & pumped sand slurry containing an additional 7,160 lbs of 20/40 mesh sand to raise top of sand plug. POOH w/CT. RD. 2/23/97: RIH &tagged TOS at 9910' MD. 3/25/97: RIH w/CT & pumped gelled sand slurry containing an additional 1250 lbs of 20/40 mesh sand to raise the sand plug to 9820' MD. POOH w/CT. RD. 3/27/97: RIH & tagged TOS at 9834' MD, then made bailer runs to dump 50 lbs of CaCO3 on top of sand plug. Pulled station 7 DGLV (at 9809' MD) and left station empty for cement squeeze. 4/1/97: RIH &tagged TOS at 9913' MD. 4/17/97: Made runs w/bailer to dump 16 gallons of sand & 5 gallons of CaCO3 to raise the sand plug to 9882' MD. 4/20/97: MIRU CTU & PT equipment. RIH w/CT & fluid packed the well w/Hot 1% KCI Water. Tagged TOS at 9891' MD, then PU & pumped 20 bbls of Latex Acid Resistive Cement to squeeze off the tubing patch leak through open gas lift station 7. Took cement returns up the IA, then shut down holding 500 psi on the well for 75 minutes. Circulated biozan, followed by Crude to circulate out the IA through gas lift station 7, and jetted down the tubing to 9879' MD. POOH w/CT pumping in Crude. RD. 5/1/97 - 6/1/97: Milled through cement & sand w/underreamer (5/2) to 10200' MD & jetted CT fill cleanouts (5/13 & 5/29) to 10517' MD. Tagged PBTD (6/1) at 10566' MD, indicating the top two perforation intervals were uncovered. Returned the well to production w/lift gas & obtained a valid welltest. GeoQuest 500 w. International Airport Road Anchorage, AK 99518-1199 ATTN: Sherrie NO. 9575 Company: 7/1 4/95 Alaska Oil & Gas Cons Corem Attn: Larry Grant 3001 Porcupine Drive Anchorage, AK 99501 Field: Prudhoe Bay Floppy Well Job # Log Description Date BL RF Sepia DIR MWD Disk D.S. 1-5ST '7(.] '~(..~ PROD PROFILE 950610 I I - ID.S. 4-7 ST'~'"- '"/'7 INFLATABLE BRIDGE PLUG 950627 I 1 D.S. 6-16 ~ ~ '~"~ PROD PROFILE 950624 1 1 D.S. 9-9 'e~ C ,~ ~1~ ~ PROD PROFILE 950628 I 1 D.S. 5-6A ~ [ INDUCTION LOG (IRT-J ILD/SN) 950626 I 1 D.S. 5-6A -/~ (-'" O ~ CBT SONIC (OPEN HOLE) 95 0 6 2 6 I 1 ,,, ,, SIGNED: Please sign and return one copy of this transmittal to Sherrie at the above address. Thank you. AUG 4 ]995 DAl~/?ka 0il & Gas Cons. C011]rilissJ0n ~cnorage STATE OF ALASKA ' ALASKA AND GAS CONSERVATION CC --vlISSION REPORT OF SUNDRY WELL OPERATION: 9 / /,.., Operation shutdown Stimulate Plugging Perforate Pull tubing Alter casing Repair well Other 1. Operations performed: 2. Name of Operator ARCO Alaska, Inc. 3. Address P.O. Box 100360, Anchorage, AK 99510-0360 4. Location of well at surface 1698' FSL, 0' FEL, sec. 2, T20N, R15E, UM At top of productive interval 1126' FNL, 1346' FEL, Sec. 1, T10N, R15E, UM At effective depth 1126' FNL, 1346' FEL, Sec. 1, T10N, R15E, UM At total depth 1104' FNL, 1297' FEL, sec. 11, T10N, R15E, UM 5. Type of Well Development X 6. Datum of elevation(DF or KB) % 54 RKB feet 7. Unit or Property Prudhoe Bay Unit Exploratory Stratigraphic Service RECEIVED JUL 1 1 1994 Nas~ ~il & Gas Cons. Commission *., N~ch0ra~e 8. Well number 9-9 9. Permit number/approval number 76-76 10. APl number 50 - 029-20232 11. Field/Pool Prudhoe Bay Oil Pool 12. Present well condition summary Total depth: measured true vertical 10800 feet 9132 feet Plugs(measured) Fill Tag @ 10588' MD (3/31/94) Effective depth: measured 10588 feet true vertical 8946 feet Junk(measured) Casing Length Size Cemented Measured depth True vertical depth Conductor 80' 20" 300 sx AS 107' 107' Surface 2672' 13-3/8" 6100 sx AS 2726' 2726' Production 10726' 9-5/8" 1000 sx CL G & 300 sx AS 10780' 9113' Scab Liner 610' 7" 147 sx CL G 10691' 9036' Perforation depth: measured 10518-10520'; 10526-10530'; 10572-10622' true vertical 8887-8888'; 8893-8895'; 8933-8974' Tubing (size, grade, and measured depth) 7", 13 Cr-80, Fox @ 3005' MD; 5-1/2", 13 Cr-80, Fox @ 10039' MD; 4-1/2", 12.6~, 13 Cr-80, Fox @ 10061' MD Packers and SSSV (type and measured depth) Baker D pkr @ 10039' MD; 7", Camco BaI-O SSSV @ 2208' MD 13. Stimulation or cement squeeze summary Intervals treated(measured) See attached. Treatment description including volumes used and final pressure 14. Prior to well operation Subsequent to operation Representative Daily Average Production or Injection Data OiI-Bbl Gas-Md Water-Bbl Casing Pressure 1824 4482 9073 1681 4869 7626 Tubing Pressure 404 368 15. Attachments Copies of Logs and Surveys run Daily Report of Well Operations 16. Status of well classification as: Oil x..~. Gas__ Suspended__ Service 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed /1~.~.,..~/~-~ ~'-~r ~',/..~,~,.,dV~,,k"' Title Engineering Supervisor Form 10-404 Rev 06/15/88 11041Q ~,r,. I~1'~ I~,AII:::) Date SUBMIT IN DUPLICATE 9-09 TUBING PATCH INSTALLATION DESCRIPTION OF WORK COMPLETED 4/23/94 · RIH & set a 3.00" ID Alpha Chrome 'Soft Set' Tubing Patch at 9900' to 9920.6' MD (seal to seal), in the 5-1/2" tubing, across leaking GLM #8 located at 9909' - 9914.5' MD. Rigged down. Returned the well to production w/lift gas & obtained a valid welltest. REEEIVED JUL 1 1 1994 Alaska Oil & Gas Cons. Commission Andi0ra~e ARCO Alaska, Inc. Date: Subject: From/Location: Telephone: To/Location: P.O. Box 100360, Anchorage, AK May 10, 1994 ARCO Cased Hole Finals John E. DeGrey/ATO- 1529 (907) 263-4310 Transmittal #: 94037 99510,~ ~ R C£1, oil ~ ~as Cons. ,Anchorage Distribution i Well · Number __~~,' OWDW- cO- ?_q 0 NW OWDW- 00- ~.~sq SE ~- ~ - ~ 1-4 ~-~- ~ 1-17 1 ~&-I5% - ~ 1-24A ~-2~-~ 2-18 ~ 2-19 ~- '~ 2-25 ~-~- ~ 2-34 ~t-~ ~-' ~ 2-35 ~ 3-17 ~toL ~ 3-17 9S-t~t ~~ 3-21 8q-~ -~ 3-29 ~-%~% ~ 4-29 ~-~ ~ 4-33 ~q-iO( { 4-44 ~ 4-44 4-45 ~-~%. ~ 5-10 5-15A, g%~ ~ 5-15A ~~. ~ 6-6 ~-~ ~ 6-14~ '~-%~ ~ ~ 6-14A ~ - %% .... ~ 6-22A Log Date (M-D-Y) Tool Type Run, Scale f CNL / TDT-P 04-30-94 Pump-in Temp 1, 5" 04-30-94 Pump-in Temp 1, 5" 04-19-94 1, 5" 1 5" 04-20-94 04-07-94 /- TDT-P I 5" 04-08-94 J Perf Record i I 5" 04-16-94 / Perf Record ~ 1 5" 04-17-94 / Prod Profile i 1 5" 1 5" 04-18-94 04-19-94 / Bridge Plug .-- Prod Log ~' Prod Profile /Injection Profile / Perf Record 04-12-94 04-27-94 04-19-94 Contractor f Perf Record : 511 Sch Sch Sch Sch Sch Sch Sch Sch Sch 1, 1"&5" Sch Sch I t 5II 04-20-94 1, 5" 04-14-94 . 04-29-94 Leak Detect [. 1, 1 "&2"&5" -"lniection Profile l 1 f USIT 04-12-94 04-14-94 f TDT-P 04-14-94 ~' CNTG / CNTG /' TDT-P f Perf Record 04-24-94 04-24-94 04-22-94 04-13-94 j~ Leak Detect i 1 15" I 5" 1, 2"&5" 04-25-94 1'"' CTU Prod Log 04-26-94 I / TDT-P 04-16-94 t ~- Leak Detect 04-17-94 !~ Completion 04-08-94 t~ TDT-P 04-19-94 ! ~ Completion 04-27-94 j /Perf Record Sch Sch Sch Sch 5" Sch 5" Sch 5" Sch 5" Sch 5" Sch Sch Sch Sch Sch Sch Sch Sch Sch Sch i 07-23 07-23 ,. 04-13-94 j -~Patch Record 04-16-94 i /~Leak Detect 12-09-93 i ~'~ TDT-P 7-24 i 1, 5" 7-24 04-18-94 i -'~ Inj Profile ~ 1, 5" 9-1 04-12-94 j~' Patch 04-23-94 i .--Patch Record 04-20-94 i -'-Inject Profile Sch Sch Sch Sch Sch Sch : , Sch : Sch ARCO Alaska, Inc. Is a Subsidiary of AtlantlcRIchfleldCompany ARCO Alaska, Inc. Date: Feb 16, 1994 P.O. Box 100360, , .,orage, AK Transmittal #: 94023 99510,~ ~, Subject: ARCO C~ From/Location: John E. DeGrey/ATO-1529 Telephone: (907) 263-4310 To/Location: Distribution o Well Number l 3-20A ! 3-21 i 3-27 3'32 4-$ ,4-32 [//4-46 ,P~ 4-46 ~ 9-9 ! 9-13 9-20 9-34 11- 16ST1 1-17 f 12-16A 14-2B ~14-2 B 4-31 [15-9A ~15-22 16-7 16-22 ~ 16-29A Number of Records:32 John E. DeGrey Log Date (M-D-Y) 12-24-92 01-24-94 1-30-94 2-5-94 2-2-94 2-4-94 2-4-94 2-3-94 1-25-94 1-26-94 2-2-94 2-6-94 2-6-94 2-7o94 2-7-94 1-26-94 1-24-94 1-29-94 1-24-94 1-25-94 2-3-94 Tool Type PFC/GR Static press/Temp Perf Record CNL Perf Record Compi Record CompI Record Prod Profile Bridge Plug ~ Tubing Cutter Compl Record Run, Scale , 5II 1 511 1,5" 1~ 5II 1 511 , 5tI 1 511 1, 1"&5" 1 5" 1 5" USlT/Cement 1 5" PDC & Jeweri¥ 1 5" Leak Detec 1 2" Leak Detec 1, 2"&5" Leak Detec Bridge Plug%t~l Bridge Plug Mi Inj Profile Bridge Plug Bridge Plug ~., 2-5-94 Leak Detec 2-2-94 Perf Record 2-3-94 USlT/Oement 2-4-94 2-4-94 2-6-94 2-6-94 6-16-92 2-3-94 1-31-94 Perf Record , 5II ! 5II 1, 5" 1,5" z t~--- 1, 1"&5" 1 5" 1 5" I 5" 1 5" Prod Profile I Perf Record I 5" Perf Record I 5" Casing Collar ( _~"~ I 5" Gas lift survey I- 1 1" Prod Log ~ 1, 1"&5" Contractor Atlas Sch Sch Sch Sch Sch Sch Sch Sch Sch Sch Sch Sch Sch Sch Sch ~ Sch Sch Sch Sch Sch Sch Sch Sch Sch Sch Sch Sch Atlas Sch Sch DS# 1-24ST the correct well name is 1-24A DS# 11-16ST1 the correct APl# is 50-029-21581-00 ARCO Alaska, Inc. Is a SubsldlaW of AtlantlcRIchfleldCorr~my ARCO Alaska, Inc. P.O.B~x 100360 Anchorage, Alaska 99510 DATE: 10-8-93 77-~7 1-11 ?~7L_2-12 ~-2~.z. 4-29 ~lq~ 4-42 -17 1 ~- S7 ~-2~ v~-c~-7-8 7~~-9 ~ 11-25 ~3-1 ~B-~l 14-24 5-18 e 15-3o ~~ 16-7 ~6-31 ~17-21 8-29-93 Prod Proflle/k~l~l~a~ Run 1, 5" I~0~~ch 8-29-93 Prod Proflle/~a~l~~5 Run 1, 5" ~u0o-~\~0Sch 8-29-93 Prod ~offie (s~i¢~~~~~ 5" ~q~ ~Sch ~ 9-7-93 ~j ~offie & S~cl~?,~~~ 5" ~q~Sch 9-7-93 ~j ~offie & Staflc]~'°)~~ 1, 5"~qo-t~ch 9-3-93 ~l B~t T~P R~. ~ 5" ~q~- Sch ~qo 9-8-93 ~j ~offie & Static lsf~l~~~'' ~7~-a ~ Sch 9-3-93 ~ B~t T~P R~ 1, 5"~- q~o Sch 9-4-93 Pe~ Record ~-tto~ R~ 1, 5" Sch · 9-4-93 Pe~ Record ~-~ R~ 1, 5" Sch 9-10-93 ~uc~on~alg~]~e R~ 1, 1"&5" ~ Schq~ 8-31-93 USIT (Cement) Color R~m 1, 5''~ tZ~~ch~q 8-31-93 USIT (~sion) ~lor R~ 1, 5"t~l~sq Sch 9-2-93 ~ B~t ~P R~ 1, 5"~~- Sch~%5 9-10-93 ~od ~offie~O[?~~ R~ 1, 5'~ Sch ~qo~- as~ 8-29-93 ~od ~offie[~l~~ R~ 1, 5" ~.o~ Sch t~ 9-5-93 C~ l~-~~ R~ 1, 5" Sch 9-12-93 ~P ~%o R~ 2, 5" Sch 8-30-93 ~ Detecti~l~R~ 1, 2" to0-~Sch 9-10-93 Pe~ Record ~ ~z~s-l~ R~ 1, 5" Sch 9-3-93 GR/CCL (TCP ~e-~) R~ 1, 5" ~--- ~t~zso 9-5-93 ~ ~/ae~al~[~:/e~ R~ 1, 1"&5" ~- Sch ~5 9-7-93 ~~ ~- i~ Rnn 1, l"&5" Sch 9-4-93 Pe~ Record %~a~o R~ 1, 5" Sch RECEIVED BY___~ '~ Have A Nice Dayl Sonya WallAce ATO-1529 # CENTRAL FILES # CHEVRON # CLINT CHAPMAN # EXXON # MOBIL the attached copy as receipt of data. APPROVED Trans# 93109-- -- # PHILLIPS # BPX # STATE OF ALASKA The correct top logged interval for this log is 12,900 feet. The correct top logged interval for this log is 10,400 feet. ARCO J.1A~rA, Inc. P.O.Box 100360 Anchorage, Alaska 99510 DATE: 9-18-92 REFERENCE: ARCO CASED HOLE FINALS //'~// 3..1R 7-31-93 IJlJ Proffie ~ ~ -/-~-~3-17 7-31-92 InJ Profile 9-g 8-x-g'J x ome - ~-~.. ~__~_.~ g-xx . 8-2-02 Prod ~onle ~ X2-X4ST ?-.S X.-O'J C~t X3-6 8-4-93 XnJ Profile ~~ 8-4-02 P~o~ P~°ffie 7-~O-f~J Profile 7-~X-g~ 8-~-02 P~od Profile l~m 1, 5" Rxm 1, 5" Rxm L 5" R,m Run 1, 5" Run 1, 5" Run L 5" Run L 5" Run L5" CAmco CAmco Camco CAmco CAmco Camco Please sign nr~d return tl!.e attach~l copy as receipt of data. RECEIVED BY~~~r~~/~ Sonya Wallace 0 5 1991 APPROVED ATO-1529 0CT Trans# 9220~-- # PHILIAPS PB WELL FILES R&D # BPX # STATE OF ALASKA TEXACO Alaska Oil & Gas Cons. Commission Anchorage # CENTI~ ~ # C.B~VRON # EXTENSION EXPI23RATION # EXXON MARATHON # MOBIL * The correct well name is 16-29A not 16-29ST. .... STATE OF ALASKA ALASKA . AND GAS CONSERVATION CC REPORT SUNDRY WELL OPEHATIONS 1. Operations performed: Operation shutdown Stimulate Plugging Perforate X Pull tubing Alter casing Repair well Other 2. Name of Operator ARCO Alaska, Inc. 3. Address P.O. Box 100360, Anchorage, AK 99510-0360 4. Location of well at surface 1698' FSL, 0' FEL, Sec. 2, T20N, R15E, UM At top of productive interval 1126' FNL, 1346' FEL, Sec. 1, T10N, R15E, UM At effective depth 1126' FNL, 1346' FEL, Sec. 1, T10N, R15E, UM At total depth 1104' FNL, 1297' FEL, Sec. 11, T10N, R15E, UM 5. Type of Well Development Exploratory Stratigraphic Service 6. Datum of elevation(DF or KB) 54' RKB 7. Unit or Property Prudhoe Bay Unit 8. Well number 9-09 9. Permit number/approval number 76-76 10. APl number 50 - 029-20232 11. Field/Pool Prudhoe Bay Oil Pool feet 12. Present well condition summary Total depth' measured true vertical 10800 feet Plugs(measured) 9132 feet Effective depth: measured 10691 feet true vertical 9037 feet Junk(measured) Casing Length Size Cemented Measured depth True vertical depth Conductor 80' 20" 300 sx AS 107' 107' Sudace 2672' 13-3/8" 6100 sx AS 2726' 2726' Production 10726' 9-5/8" 1000 sx CL 'G' & 300 sx AS 10780' 9113' Liner 610' 7" 147 sx CL 'G' 10691' 9036' Perforation depth: measured 10518-10520';10526-10530';10572-10622' true vertical 8887-8888';8893-8895';8933-8974' Tubing (size, grade, and measured depth) 7",13CR-80,Fox @ 3005' MD;5-1/2",13CR-80,Fox @ 10039' MD;4-1/2" 12.6#,13CR-80, Fox @10161' MD Packers and SSSV (type and measured depth) Baker 'D' pkr @ 10039 MD; 7", Camco 'Bal-O' SSSV @ 2208' MD 13. Stimulation or cement squeeze summary ~-~ECEIVED 14. Intervals treated(measured) Treatment description including volumes used and final pressure Prior to well operation Subsequent to operation S E P - 1 1992 AI~ 0!! & 6*s Rnn~ gnmrniSSi0n Representative Daily Average Production or Injection Data ~[Ichnrnna OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure ~u~g Pressure 1650 ~ 2558 291 - 320 3100 ¢ 4495 1527 - 315 15. Attachments Copies of Logs and Surveys run Daily Report of Well Operations 16. Status of well classification as: Oil X Gas __ Suspended Service 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed ~ , Form10_404 Rev 06/15/88 ~-~ ~ Title FS-2RegionalOperationsEngineer sDL~tBeMiTf¢~//~DUPL;~CATE ~ REPORT OF WELL OPERa. ~ONS DS 9-09 Perforating Operations: ARCO Alaska, Inc. perforated DS 9-09 at selected intervals in the Sadlerochit Sand of the Prudhoe Bay Unit on 7/11/92. The intervals perforated were the following: 10518'-10520'; 10526'-10530' MD (Reference Log: SWS-BHCS dated 11/30/76). Production fluid was in the wellbore during perforating operations. All wireline work was done through a 5000 psi WP BOP/Lubricator tested to 1.2 times the maximum expected surface pressure. A short summary of the work is given below: Began perforating operations on 7/11/92. RU perforating unit, pressure tested BOP's and lubricator to 3000 psi, okay. S.I. well, RIH and perforated 10526'-10530' MD at 2 SPF, Logged up and perforated 10518'-10520' MD at 2 SPF, POOH, and confirmed all shots fired. (ref: SWS-BHCS of 11/30/76). Rigged down and secured well. RDC: 8/14/92 RECEIVED s P - ! 199 Alaska 0il & Gas Cons. Commission Anchorage ARCO .~l~sk_~_, Inc. P.O.Box 100360 Anchorage, Alaska 99510 DATE: 7-3 1-92 REFERENCE: ARCO CASED HOLE FINAI~ 1-4 ~o ~>~ 7-12-92 CCL/Perf Run 1, 5" Atlas 1-13 2~ 7-18-92 CCL/Perf Run 1, 5" Atlas 2-31 7-6-92 Prod/Press/Spin/Temp/Trap Run 1, ~' Sch 3-10 2~-~/ 7-6-92 CCL/Perf Run 1, 5" Atlas 3-35 7-13-92 C~L/Perf Run 1, ~' Atlas 9-9 ~/"~ 7-12-92 CCL/Perf Run 1, 5" Atlas 9-11 ?~/ 7-13-92 CCL/Perf Run 1, 5" Atlas 11-7 ~/-/~ 7-11-92 CCL/Tubing Cutter Run 1, ~' Atlas 11-16ST 5-30-92 MAI Acoustic Filtered Waveforms Run 2, ~' Atlas 11-16ST 5-30-92 BHC MAI Comp Slowness Curves Run 2, ~' & ~' Atlas 12-6A~.~-~'~/7-11-92 PFC/GR Run 1, ~' Atlas 15-9 7-13-92 Collar/Perf Run 1, 5" Atlas 15-28 ~ ~/y~ 7-12-92 PFC/GR. R~_m 1, ~' Atlas 17-3 7-12-92 CCL/Perf Run 1, 5" Atlas NGI-11 7-19-92 CCL/Tubing Cutter Run 1, 5" Atlas Please sign and return the attached copy as receipt of data. RECEIVED B Y___~-~~~_L___ Have A Nice Day! Sonya W~ll~_ce ATO-1529 # CENTRAL FILES # CHEVRON D&M . ' # EXTENSION EXPLORATION # EXXON MARATHON # MOBIL # PHILLIPS PB WELL FILES R&D # BPX # STATE OF ALASKA TEXACO AUG 1 0 199 Alaska Oil 8, G~s (ions. commission Anchorage ..... STATE OF ALASKA ALASKA . AND GAS CONSERVATION CC ~IlSSION REPORT SUNDRY WELL OPEHATIONS 1. Operations performed: Operation shutdown Stimulate X Plugging Pull tubing Alter casing Repair well Perforate Other 2. Name of Operator ARCO Alaska, Inc. 3. Address P.O. Box 100360, Anchorage, AK 99510-0360 4. Location of well at surface 1698' FSL, 0" FEL, Section 2, T20N, R15E, UM At top of productive interval 1126' FNL, 1346' FEL, Section 1, T10N, R15E, UM At effective depth 1126' FNL, 1346' FEL, Section 1, T10N, R15E, UM At total depth 1104' FNL, 1297' FEL, Section 1, T10N, R15E, UM 5. Type of Well Development X Exploratory , , Stratigraphic Service RECEIVED JUN - 2 1992 Alaska 0ii & Gas Cons. O0mmissiO' Anchorage 6. Datum of elevation(DF or KB) 54' RKB 7. Unit or Property Prudhoe Bay Unit 8. Well number 9-9 9. Permit number/approval number 76-76 10. APl number 50 - 029-20232 11. Field/Pool Prudhoe Bay Oil Pool feet 12. Present well condition summary Total depth: measured true vertical 10800 feet Plugs(measured) 9132 feet Effective depth: measured 10691 feet true vertical 9037 feet Junk(measured) Casing Length Size Cemented Measured depth True vertical depth Conductor 80' 20" 300 sx AS 107' 107' Sudace 2672' 13-3/8" 6100 sx AS 2726' 2726' Production 10726' 9-5/8" 1000 sx G & 300 sx AS 10780' 9113' Liner 610' 7" 147 sx CIG 10691' 9036' Perforation depth: measured 10572-10614'; 10614-10622' true vertical 8932-8969'; 8969-8976' Tubing (size, grade, and measured depth) 7", 13 Cr-80, Fox @ 3005' MD; 5-1/2", 13 Cr-80, Fox @ 10039' MD; 4-1/2", 12.6#, 13 Cr-80, Fox @ 10161' MD. Packers and SSSV (type and measured depth) Baker "D" Packer @ 10039' MD; 7" Camco "BaI-O" SSSV @ 2208' MD 13. Stimulation or cement squeeze summary Intervals treated(measured) See attached. Treatment description including volumes used and final pressure 14. Representative Daily Average Production or Injection Data OiI-Bbl Gas-Md Water-Bbl Casing Pressure Prior to well operation 398 566 0 -- Subsequent to operation 1634 2470 293 ~- Tubing Pressure 258 334 15. Attachments Copies of Logs and Surveys run Daily Report of Well Operations . 16. Status of well classification as: Oil x Gas , Suspended~.. Service 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed Title Sr. Area Operations Engineer Form 10-404 Rev 06/15/88 SUBMIT IN DUPLICATE 9-9 DESCRIPTION OF WORK COMPLETED FRACTURE TREATMENT OF ZONE I 4/8/92: RIH w/RHC Plug surge disk & set plug in the tubing tail at 10116' MD. 4/9/92 · MIRU & PT equipment to 9500 psi. Proceeded the fracture treatment by shearing the surge disk at 5900 psi, after pumping 114 bbls 1% KCl Water. Pumped a Hydraulic Fracture Treatment, using 16/20 mesh & resin coated proppants, through the perforations located at: 10572 - 10614' MD (Z1B) 10614 - 10622' MD (Z1B) Ref. Log: BHCS 11/30/76. Pumped: a) 398 bbls 20# Pre Pad Gel, @ 30 bpm, followed by b) Shutdown. Resumed pumping: c) 610 bbls 40//Gelled Pad, @ 30 bpm, w/137 gals ESL Scale Inhibitor, followed by d) 270 bbls Crosslinked Slurry, w/proppant in I - 10 ppg stages, followed by e) 291 bbls Flush w/3% HCI @ 40 bpm, followed by f) Shutdown. Placed a total of 37,000 lbs of proppant into the formation. Rigged down. 4/10/92- Performed a proppant fill cleanout to 10660' MD. 4/1 2/92: RIH & tagged bottom at 10660' MD. Returned well to production & obtained a valid production test. RECEIVED J u N - 199 Alaska Oil & Gas Cons. CommiSsio~ Anchorage STATE OF ALASKA ALA,SrtA OIL AND GAS CONSERVATION COMMISS~,,.,N ~ REPORT OF SUNDRY WELL OPERATIONS RIGINAI 1. Operations performed: Operation shutdown Stimulate Plugging__ Pulltubing X AItercasing X Repairwell Perforate , Other X WORKOVER 2. Name of Operator ARCO Alaska, Inc. 3. Address P. O. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 1698' FSL, O' FEL, Section 2 TION, R15E, UM At top of productive interval 1126' FNL, 1346' FEL, Section 1, TION, R15E, UM At effective depth 1126' FNL, 1346' FEL, Section 1, TION, R15E, UM At total depth 1104'FNL, 1297' FEL, Section 1, TION, R15E, UM 5. Type of Well: Development X Exploratory Stratigraphic Service 6. Datum elevation (DF or KB) 7. Unit or Property name Prudhoe Bay Unit 8. Well number DS 9-9 9. Permit number/approval number 76-76 / N/A (Cons Order #258) 10. APl number 50- 029-20232 11. Field/Pool Prudhoe Bay Fie/d/Oil Pool 54 feet 12. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical 10800 feet Plugs (measured) 9132 feet 10692 feet Junk (measured) 9038 feet Casing Length Size Cemented Measured depth Structural Conductor 80' 20' 300 sx AS 107' Surface 2672' 13-3/8" 6100 sx AS 2726' Intermediate Production 10726' 9-5/8" 1250 sx G & 300 sx AS 10780' Liner 610' 7" 147sx CIG 10691' Perforation depth: measured None True vertical depth 107' 2726' 9113' true vertical None Tubing (size, grade, and measured depth) 7" 13Cr-80 Fox @ 2907'& 5-1/2' 13 er-80 Fox @ 10061' Packers and SSSV (type and measured depth) Baker'D'Packer@ 10148'; Cam~'~l-~'~f~~j~' 13. Stimulation or cement squeeze summary See Attached Activity Summary Intervals treated (measured) D ,'~laska Treatment description including volumes used and final pressure Anchorage 14. Prior to well operation Subsequent to operation Representative Daily Average Production or Iniection Data OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure 15. Attachments Copies of Logs and Surveys run Daily Report of Well Operations 16. Status of well classification as: Oil X Gas Suspended Service 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sicjned ~)~ ~-~'~t~_ TitleWorkoverSuperintendent Form 10-404 Rev 06/15/88 Date ///~'/~ SUBMIT IN DUPLICATE ACTIVITY SUMMARY BP/ALI SHARED SERVICE PRUDHOE BAY NORTH SLOPE DS 9-9 AK AUDI 4 NDNU: 10.0 07/12/91 ( 1) TD:10800 PB:10692 SUPV:GDM KILL WELL W/ SEAWATER MW: 8.5 Seawater RIG ACCEPTED @ 20:00 HRS, 7/11/91. R/U HARD LINES TO TREE. TEST LINES. PULL BPV. BLEED GAS OFF IN ANNULUS. R/U TO KILL WELL. DAILY:S52,029 CUM:$52,029 ETD:S52,029 EFC:$1,839,000 KILL: 13.5 NDNU: 10.5 07/13/91 ( 2) CIRC HEC SWEEP. MW: 8.5 Seawater TD:10800 CIRC DN ANNULUS, TBG. ANNULUS DEAD. SET BPV. N/D TREE. PB:10692 N/U BOPE. TEST BOPE. NO TEST. TEST BOPE. PULL TEST PLUG. SUPV:GDM M/U LAND JT. PULL OUT PBR. PULL HGR TO FLOOR. LOAD ANNULUS. PUMP DN TBG. CIRC HEC SWEEP TO SURFACE. DAILY:S27,240 CUM:$79,269 ETD:S79,269 EFC:$1,839,000 KILL: 1.5 PTBG: 22.5 07/14/91 ( 3) REPAIR PIPE P/U MACHINE. MW: 8.5 Seawater TD:10800 CIRC. POOH W/ 7" X 5-1/2" TBG. TEST BOPE. P/U TSA SPEAR. PB:10692 REPAIR PIPE P/U MACHINE. SUPV:GDM DAILY:S30,870 CUM:$110,139 ETD:S110,139 EFC:$1,839,000 PPBR: 11.5 PPKR: 12.5 07/15/91 ( 4) MILL ON PKR. MW: 8.5 Seawater TD:10800 RIH. TAG PBR @ 10135'. ENGAGE PBR. SPOT 100 BBLS XCD. PB:10692 POOH. L/D SPEAR, PBR. RIH W/ TSA MILL. MILL ON BAKER SUPV:GDM 'SAB' PKR @ 10151'. DAILY:S32,335 CUM:$142,474 ETD:S142,474 EFC:$1,839,000 PPKR: 18.5 COUT: 5.5 07/16/91 ( 5) CBU. MW: 8.5 Seawater TD:10800 MILL ON PKR @ 10153'. PUMP 50 BBLS XCD SWEEP. WORK PKR PB:10692 FREE. PUMP 50 BBLS XCD SWEEP. CBU. POOH. PKR HUNG UP @ SUPV:GDM 10113' MILL ON PKR. POOH. L/D PKR, TAIL ASS'Y. RIH W/ CSG SCRAPER. CIRC XCD SWEEP. DAILY:S29,850 CUM:$172,324 ETD:S172,324 EFC:$1,839,000 COUT: 1.5 TCSG: 16.0 LPRF: 6.5 07/17/91 ( 6) RIH W/ MILL. MW: 8.5 Seawater TD:10800 CBU. POOH. RIH W/ TEST PKR. SET @ 2488'. TEST. RIH TO PB:10692 4903'. SET @ 4903' TEST. RIH TO 10152'. SET PKR. TEST. SUPV:GDM OK. POOH. R/U ATLAS. RIH W/ VERTILOG F/ 10375'-SURFACE. RIH W/ MILL. DAILY:S66,471 CUM:$238,795 ETD:S238,795 EFC:$1,839,000 ACTIVITY SUMMARY BP/AAI SHARED SERVICE PRUDHOE BAY NORTH SLOPE DS 9-9 AK AUDI 4 07/18/91 (7) TD:10800 PB:10692 SUPV:GDM SQZ : 8.0 COUT: 16.0 PREP TO SQZ MW: 8.5 Seawater RIH W/ MILL. DRLG FILL, JUNK TO 10692'. PUMP 75 BBLS XCD SWEEP. POOH. RIH W/ STINGER. CIRC. PUMP 10 BBLS WATER, 50 BBLS (255 SX) 'G' W/ .7% FL-20, .15% A-2, 1 GPHS FP-6L. DISP W/ 4 BBLS WATER, 70 BBLS SEAWATER. POOH 15 STDS. REV CIRC. DAILY:S28,045 CUM:$266,840 ETD:S266,840 EFC:$1,839,000 SQZ : 24.0 07/19/91 ( 8) TD:10800 PB:10692 SUPV:GDM DRLG CMT. MW: 8.5 Seawater SQX CMT W/ 500 PSI TO 2000 PSI. PUMP 8 BBLS. RELEASE PREE. BLED BACK 5.5 BBLS. POOH. TEST BOPE. RIH W/ BIT. TAG CMT @ 10104'. DRLG CMT F/ 10139'- 10483' DAILY:S52,169 CUM:$319,009 ETD:S319,609 EFC:$1,839,000 COUT: 16.0 RCSG: 8.0 07/20/91 ( 9) RIH W/ LNR. MW: 8.5 Seawater TD:10800 DRLG CMT F/ 10483'-10680' FELL THRU TO PBTD. CIRC 100 PB:10692 BBLS HEC PILL. REV CIRC. CIRC. TEST SQZ. POOH. R/U SUPV:GDM WEATHERFORD. RIH W/ 7" LNR. DAILY:S35,495 CUM:$354,504 ETD:S354,504 EFC:$1,839,000 RCSG: 24.0 07/21/91 (10) TD:10800 PB:10692 SUPV:GDM RCSG: 24.0 07/22/91 (11) TD:10800 PB:10692 SUPV:GDM POOH. MW: 8.5 Seawater RIH W/ 7" LNR. PUMP 30 BBLS (185 SX) 'G' CMT W/ 1% CD31, 15% RI, 1 GPHS FP6L @15.8 PPG. DISP W/ 91 BBLS SEAWATER. BUMP PLUG W/ 3000 PSI. RELEASE F/ LNR. POOH. RIH. TAG CMT @ 9948'. DRLG TO 9953' (FIRM CMT). DRLG CMT F/ 9953'-10081'. CIRC 100 BBLS HEC SWEEP. POOH. 7" LNR F/ 10691'-10081'. DAILY:S67,863 CUM:$422,367 ETD:S422,367 EFC:$1,839,000 POOH. MW: 8.5 Seawater POOH. RIH W/ CSG SCRAPER. TAG TOL @ 10081' DRLG CMT TO 10106'. RIH. TAG CMT @ 10600' DRLG F/ 10~00'-10650' (VALVE, CMT, FLOAT). CIRC 100 ~BLS HEC SWEEP. TEST LNR. CIRC. POOH. DAILY:S82,578 CUM:$504,945 ETD:S504,945 EFC:$1,839,000 RPKR: 22.5 RCMP: 1.5 07/23/91 (12) R/U WEATHERFORD. MW: 8.5 Seawater TD:10800 POOH. R/U WEATHERFORD. RIH W/ BAKER 'D' PKR & 3-1/2" 13 CR PB:10692 TAIL ASS'Y. SET PKR @ 10030' TEST BOPE. R/U JAM SUPV:GDM EQUIPMENT. DAILY:S73,984 CUM:$578,929 ETD:S578,929 EFC:$1,839,000 ACTIVITY SUMMARY BP/AAI SHARED SERVICE NORTH SLOPE AK PRUDHOE BAY DS 9-9 AUDI 4 RCMP: 24.0 07/24/91 ( 13) TD:10800 PB:10692 SUPV:GDM CIRC. MW: 8.5 Seawater RIH W/ 7" X 5-1/2" 13 CR FOX TBG. TEST CNTRL LINES. OK. M/U TBG HGR, CNTRL LINES, LAND JT. PUMP DIESEL. DAILY:S448,292 CUM:$1,027,221 ETD:S1,027,221 EFC:$1,839,000 NDNU: 4.5 RCMP: 2.5 07/25/91 (14) RIG RELEASED. MW: 8.5 Seawater TD:10800 U-TUBE DIESEL. LADN TBG HGR. TEST TBG. OK. L/D LAND JT. PB:10692 SET BPV. N/D BOPE. N/U TREE. TEST TREE. INSTALL BPV. SUPV:SMS SECURE SELL. RIG RELEASED @ 13:00 HRS, 7/24/91. DAILY:S14,116 CUM:$1,041,337 ETD:S1,041,337 EFC:$1,839,000 ~.-. STATE OF ALASKA ._. ALASKA _AND GAS CONSERVATION CC /IISSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown Stimulate Plugging ~ Perforate X Pull tubing Alter casing Repair well Other 2. Name of Operator ARCO Alaska, Inc. 3. Address P.O. Box 100360, Anchorage, AK 99510-0360 4. Location of well at surface 1698' FSL, 0' FEL, Sec. 2, T10N, R15E, UM At top of productive interval 1196' FNL, 1485' FEL, Sec. 1, T10N, R15E, UM At effective depth 1126' FNL, 1346' FEL, Sec. 1, T10N, R15E, UM At total depth 1104' FNL, 1297' FEL, Sec. 1, T10N, R15E, UM 5. Type of Well Development X Exploratory Stratigraphic 6. Datum of elevation(DF or KB) 54 RKB 7. Unit or Property Prudhoe Bay Unit 8. Well number 9-09 9. Permit number/approval number 76-76/90-006 10. APl number 50 - 029-20232 11. Field/Pool Prudhoe Bay Oil Pool feet 12. Present well condition summary Total depth: measured true vertical 10,800 feet 9132 feet Effective depth: measured 10,692 feet true vertical 9039 feet Casing Length Size Contractor 80' 20" S u dace 2699' 13-3/8" Production 10,753' 9-5/8" Liner 610' 7" Plugs(measured) Junk(measured) Cemented 300 sx Arcticset cmt 6100 sx Arcticset cmt 1250 sx Cl 'G' & 300 sx AS 185 sx CI 'G' Measured depth 107' 2726' 10,780' 10,691' True ve~icaldepth 107' 2726' 9115' 9037' Perforation depth: measured 10,572-10,622' true vertical 8933-8975' Tubing (size, grade, and measured depth) 7 x 5 1/2", L-80 tubing w/tail @ 10,173' Packers and SSSV (type and measured depth) SAB packer @ 10,039'; Camco SSSV @ 2208' 13. Stimulation or cement squeeze summary RECEIVED Intervals treated(measured) Treatment description including volumes used and final pressure Alaska Oil & Gas Cons. (;omrnis Anchorage 14. Prior to well operation Representative Daily Averaae Production or Iniection Data OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure 0 0 0 Tubing Pressure Subsequent to operation 250 250 50 15. Attachments J 16. Status of well classification as: Copies of Logs and Surveys run I Daily Report of Well Operations X OilX Gas _._ Suspended 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Service 230 ~iogr nj~0~88~ ~ Title Sr. Area Operations Engineer SUBMIT IN DUPLICATE _ql Ikl/nh DS 9-09 pERFORATING SUMMARY OF oPERATIONS intervals in the Sadterochit sand of the interval perforated was the f '- "~'e wettbore during ARCO Alaska, inc. pedorated DS 9-09 at selected ollowing' 10572-10622' MD · we _, ,~o ~OP/Lubricator _ ,,~ Unit on 8/1/9.1.. ~h~e~,,~n/76~ Produced flu!ds re m ~- ~.,rudhoe B~,,~_... RHCS ctateo ~,'-'"' _,_ J.'..,,, ~ ne through a 5000 psi ,,- ~- Reference Lu~..._-.~ all wireline wor~ woo ..o ~)erforating operauo,~." expected surface pressure. tested to 1.2 times the maximum A short summary of the work is given below: Began perforating operations on 811191. RU perforating unit, pressure tested BOP's and lubricator to 3500 psi, okay. Perforated 10572-10622' MD at 4 SPF in two Gun runs (ref: BHCS of 11/30/76). SI welt, POOH, and confirmed all shots fired. Rigged down and secure well. RECEIVED OCT 1 0 199 Alaska Oil & Gas Cons. Commissio~ Anchorage ARCO ALASKA, :[NC· P.O. BOX ANCHORAGE, ALA3;K A 99L v -DATE' 9--6-9t REFERENCE' ARCO CASED HOLE FINALS i -9- 8-t 7-9t F'ROD F'ROF'ILE' RUN 2-5- 8-8-91 TEMPERATURE RUN 2-26- 8-8-9t F'ROD PROFILE RUN dS\ 'L~(3 '--'$- S 5- 8-S-9t GR-COLLAR RUN 4-''~ ~'-- 8-i 0-9i F'I 1'S RUN ..,,\ --5- :3 2- 8-i 0-9t JEWELRY RUN '~ 7'7A- 8-9-9t F'ROD F'ROFILE RUN 7-t 6~ 8-4-9t TEMPERATURE IN:UN 7-2~s- 8--i 8-9t F'ROD F'ROFILE RUN 7-28- 8-t -9t TEMPERATURE RUN 7-2~ 8-3-91 F'ERF BREAK DOWN/HF'FM/I'E:MP RUN 9-6- 8-2-9t LEAK DETECT RUN 9-'~ 8-t 9-9i F'IT~ RUN 9-17~ 8-4-9i INJ PROFILE RUN t~-Z~ 8-9-9t INJ PROFILE RUN tt-~ 8-4-9t LEAK DETECT RUN i f-24- 8-4-9t PIT~/HF'FN RUN t2-S~ 8-t4-9t LEAK DETECT RUN t2-8B- 8-9-9t F'ROD PROFILE RUN * tS-S- 8-tt-9i PROD F'ROFILE RUN tS-ti- 8-tt-9t F'ROD PROF'ILE RUN rS-t2- 8-i5-9~ F'ROD F'ROFILE RUN tS-t4- 8-t6-9t F'ROD F'ROFILE RUN t4-2S- 8-tt-9t F'ROD PROFILE RUN t5-2~ 8-t4-9t F'ERF BREAKDOWN TREATMENT RUN t6-t- 8-i6-9t INJ PROFILE RUN t8-3-- 8-i6-9t LEAK DETECT RUN CAMCO CAMCO CAHCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO PLEASE HAVE A NICE DAY! SIGN AND RETURN THE ATTACHED COF'Y AS RECEIF'i- OF DATA. SON'fA WALLACE: ATO-t 529 APF'ROVED 'T'RAN$~ 9 DISTRIBUTION CENTRAL FILES :~ PHILLIPS CHEVRON PB WELL FILES D & M R & D EXTENSION EX~:'LORAT I ON ~ BPX EXXON ~ STATE OF ALASKA MARATHON TEXACO MOBIL * 'I"HE COR. RECTED AF'I~ FOR 13-3 IS' 50-029--20325, ARCO ALA2KA., INC. ~--- F'. O. BOX ANCHORAGE, ALASKA 995t DATE · 8--26-9t REFERENCE' ARC(] CA;~ED HOLE F'tNAL2 S-2S S-2S 6-6 7-t4 7-i -? 7-i7 7-~9 7-28 7--¥S 9-2 9-9 1S-4 i4-~t *. ~4-t5 7--'~2-c~t,,__ . PROD PROFILE RUN ~ , 5' .8--6-9i GR-CCL RUN i, 5' 8--7-9~ CCL-PERF RUN t , 5' 8--7-9t CCL-PFC (PACKER) F:UN ~, 5" 7--24-9~ PROD F'ROFILE RUN t , 5" ,-~-V1 PROD PROFILE RUN 8-9-9~ TUBING CUTTER RUN ~ , 5' 8-~-9~ TUBING CUTTER RUN ~, 5' 7-27-9~ PIT2 RUN 8-9-9 ~ CCL-F'ERF RUN 7-'~;'-~~, . THD . RUN ~, 5' ~ ~9-9~ PROD PROFTLE RUN ~'-'~-~~ ~, , ~ COLLAR RUN 7-25-9~ JEWELRY RUN t, 5' 7-2~-9~ 2TATIC I'EMP 2URVEY RUN 7-2~-9~ ~TATIC TEMF' 2URYEY RUN 7-2~--9~ 2TATIC TEMP 2URVEY RUN ~, 5' PLEASE 2IGN AND RETURN THE ATTACHED COPY AS RECEIRT OF DATA. RECEIVED BY .4~ ...... HAVE A NICE DAY! ' 20NYA WALLACE AF'F'R~VED AT0-~529 TRAN~ 9~57 [;ANCO A]'LA,~ A'I"L_A6' A 'f'L A $ [;ANCO CAi,,iCO ATLAZ,' ATLAS CANCO A"i'LA3* HLS' CAMCO CAMCO CAidCO CAMCO CAMCO CAMCO D I $'f'R I BU'f' I ON ~ CENTRAL FILES' ~"" CFtEVRON D & M :~ E'"XTEN2I ON EXF'LORATION ~- EXXON MARATHON ~ MOBIL t:'HILLIP ~.' PB WELL F']:LE3.' R & D BPX STATE OF ALA,~.'KA TEXACO THE COR. RECTEi) TOF' LOG INTERVAL FOF.'. i4-i~' ARCO ALASKA, INC. F',O, BOX i00560 ANCHORAGE, ALASKA 995 -DATE' 8-t 6-91 REFEF,'LENCE' ARCO CASED HOLE FINALS · ~.. 9-3,._ 7-26-9i CNL-GR RUN ":'-'" S- 9 ., '5" ~ ~."5 8- t COLLAR-PERF RUt',! -" ":'-'~' "'-26-9i TUBING CUTI-ER ' RUN i , ~"' ,D -- .,._,_. ¢ _.. /°~'~)-.....-S-:S5 7-"25-9i PFC-GR (PACKEF;: "SETTING) Ix'UN t., 5" "~'-i S 7--5¢-- ¢,:' i PFC RUN ~/"~'~..-,"'5-S2 8-5-9t COLLAR/PACKER RUN t., 5" 7-2 7-26-9t CNL-GR RUN i., 5" 7- i '7 7-'5 i -9 i COLLAR RUN i, ~_,~" 7-29 7-5i-9t COLLAR-F:'ER'F RUN 9-2 8-t -9t TUBING CUTTER RUN i, 5' 9-9 8-t-9i COLLAR.-F'ERF RUN i , 9-i 8 - o,~ · ?-~.,=-9i COLLAR-I:'ERF RUN i , ~.~* 9-SF) 7-'24-9 i CNL-GR RUN i 2.-'29 7-24-9t CNI_-GR RUN PLEASF ~IGN AND RETURN THE ATTACHED COPY AS' RECEIP'F OF DATA, RECEIVED BY HAVE A NICE DAY! ~ONYA WALLACE ATO-'~ ~')~ AF'F'ROVFI) '¥RANS¢ 9i A '1' I... A .'::.' A TL. AS A 'f' L. A- S A 'J I_ A ,'~,' A f'L. AS AI'I..A;~ r::~ 'f' L.A A 'J'L A }:,' A 'f't_ A 2' A'f'LAS A"I" L A,.,. ~''' A'i'L.A:~ A T I... A ;".: A T t_ A 2"' DISTRIBUTION · .-'"' .CENTRAL FILES '"- CHEVRON D & M · ,~: EXTENSION EXF'LOR. ATI ON · I~ E X X 0 N HAF:ATHON :~ MOBIL .IL -.- P tq I L L :[ F' S PB WEL. L. F'IL.E:S R & D ~: B P X "" ~'i"A'f'E OF AL.A,?KA T E X A C 0 "f'HEi: CORRFCTED AF'I~- FOR '2-.7-; ]:$ 5(_":,-,:)29-'26,(-}77. THE CORRECi-ED AFZ_Z~ FOR'.~9-3-~ Z$ 5,~-,:-}29-'2i4i i. RECEivE AUC 1 9 199t :4laska 0il & ~as Cons. ~nChorage C°mrnissiot~ ARCO ALASKA, INC, F'.O. BOX i00S60 ANCHORAGE, ALASKA 995.~ DATE: 8-?-9i REFERENCE: ARCO CASED HOLE FINAL£ t-7' 7-t7-9i DIFFERENTIAL TEMF' RUN i-7~ 7-i7-9t F'DK-~Oe/GR/CCL RUN i , 5 i-22' 4-~4-9i PERF RECORD RUN t, 5 · ** 2-S,' ?-2i-9t COLLAR/PERF RUN i, 5 · ~1-~'7 4-S7" 7-2e-9i COLLAR RUN " .3c/~-S6~ 7-i8-9t GR-CCL RUN i, 5" ~1-,~5_S6. 7-t9-9t PERF-PACKER RUN ~, 5" 6-4 - 6-7-9i PERF RECORD RUN i, 5 · 6-?~ 4-t0-9i PERF RECORD RUN ~, 5 · T-SS- 4-28-9i COLLAR/PERF RUN t, 5" 9-9- 7-i7-9t VERTIL06 RUN t, 5" 9-S4. 7-6-9t PERF RECORD RUN i, 5" ~ ~' ~',~--~- 4.',. 7-~-s,~ PERF RECORD RUN it-i' 5-~2-?i PERF RECORD RUN i t~-S' 5-i8-9t F'ERF RECORD RUN ~, 5' ti-5- 7-i2-9t F'ERF RECORD RUN t S-2A~ 7-t 5-9i JEWELRY-PERF RUN i6-24' 7-8-9i COLLAR RUN i , 5 iT-S- 7-7-9~ PERF RECORD RUN iT-it- 4-24-9t COLLAR RUN t, 5' iT-it- 7-i9-9i COLLAR/F'ERF RUN t, 5' PLEASE SIGN AND RETURN THE ATTACHED COPY AS RECEIPT OF DATA~ RECEIVED BY~~I~_~ HAVE A NICE DAY! £ONYA WALLACE AT0-~529 DISTRIBUTION 'CENTRAL FILES CHEVRON D & M EXTENSION EXPLORATION EXXON MARATHON MOBIL A O'G ~ 2 1991 't4~.!;.,.ra Oil ~.Gos Con,,o PHI L L I F'S AnCh°rage' O°rnr~is~iot~ F'B WELL FILES R & D BPX STATE OF ALASKA TEXACO HLS ATLA~ A~LAS HL$ ATLAS ATLAS SCH SCH HL$ HL$ HLS ATLAS HLY HL$ HL~ HLS H£_~ HLS ATLA~ HL~ HLS ATLAS , THE cORRECTED AF'I$ FOR t-tB IS ** THE CORRECTED API$ FOR 2-S I$ 5~-~29-2~877~ ARCO ALASKA, INC. P.O. BOX 100360 '--' ANCHORAGE, ALASKA 995 DATE: 7-t2-9t REFERENCE: ARCO CASED HOLE FINALS t-it 6-5-9t F'ROD PROFILE-"' t-tt 6-5-9t GR-COLLAR J t-2t 6-7-9t F'ROD F'ROFILE/ 2-4 6-30-91 CCL-PERF/ 4-t 6-ii-gl GAS LIFT' (i-J6 6-i9-9i CBT/' -36 6-2i-9i F'FC-GR (PACKER SETTINGY /-4-37 6-2t -9t CBT-~ 6-2 ~,.l_"'l ) 4-37 t -9 t CETJ i~,_..-k~4_37 6-24-9t F'FC-GR (PACKER SETTING ~ i'5~...~-S t 6-28-9i GR-CCL~ 5-33 7-2-9i COLLAR-F'ERF~ ¢'/I'~ -33 7-2-9i PRODUCTION PACKER--- ~/-(~' 5-35 6-30-9i SBL/GR/CCL- 7- t 5 6-30-9 t CCL-PERF--- * 9-6 6-t 6-9t _ LEAK DETECTIONs' 9-8 6-5-9 t PERFORAT I ON BREAK DOWN~ 9-9 6-23-9t COLLAR-PERF-- ** 9-t0 4-i7-9t INJ PROFILEJ 9-i 8 6-i 3-9i JEWELRY-~ 9-3S 6-t 4-9t LEAK DETECTION--' ~'"l~* 9-40 6-i 2-9i lng PROFILE-' 0 -If~)9-47 6-8-9t DATA FRAC TEHF'---, ** ii-3 4-i7-9i LEAK DETECTION---' i i-5 6-1 2-9i PROD PROFILE"-. ~" ~ i t-22 7-t-9t F'DK--i O0/GR/CCL-BORAX-' i2-t2 6-i6-9t LEAK DETECTION-- t 3-i 5 6-i 7-9t INJ PROFILE--'-- **** i3-i6 6-i7-9t INJ PROFILE--- i 6-i 6 6-t 3-9i INJECTION/PRODUCTION-- t 7-i 6-t 6-9t PRISM--- t 7-t t 5-8-9t LEAK DETECT'ION-~ RUN i, 5' CAMCO RUN t, 5" CAMCO RUN t, 5" CAMCO RUN i, 5" ATLAS RUN t, S' CAMCO RUN t, S' SCH RUN t, S' SCH RUN i, 5" ATLAS RUN t, 2"&5" SCH RUN t, 2'&5' $CH RUN t, 5' ATLAS RUN t, 5' Al'LAS RUN t, 5" Al'LAS RUN i, 5' ATLAS RUN i, 5' ATLAS RUN t, 5' Al'LAS RUN t, 2'&5' CAMCO RUN t, 5' CAMCO RUN i, 5' ATLAS RUN t, 5" CAMCO RUN t, 5' CAMCO RUN t, 2' CAMCO RUN t, 5' CAMCO RUN t, 5' CAMCO RUN t, 5' CAMCO RUN t, 5' CAMCO RUN t, 5" ATLAS RUN t, 2"&5" CAMCO RUN i, 5" CAMCO RUN t, S' CAMCO RUN i, 5" CAMCO RUN t, 5" ATLAS RUN t, 2'&5' CAMCO PLEASE SIGN AND RETURN THE ATTACHED HAVE A'NICE DAY! SONYA WALLACE AT0-i529 DISTRIBUTION CENTRAL FILES CHEVRON EXTENSION EXPLORATION EXXON MARATHON MOBIL COPY AS RECEIPT OF DATA. STATE OF ALASKA TEXACO * CORRECTED.LOG INTERVAL FOR 9-6 I£ 6700-7700 ** REFERENCE MIX UF' ON TRANSMITTAL 91159 - POSSIBLE DUPLICATE LOGS *** CORRECTED LOGGED INTERVAL FOR 9-40 I$ t395t-t425t **** CORRECTED API$ FOR t3-t6 IS 50-029-20823 STATE OF ALASKA ALASKA ' AND GAS CONSERVATION CC AISSION REPORT uF SUNDRY WELL OPERATIONS !... Operations performed: Operation shutdown Stimulate Plugging Perforate X Pull tubing Alter casing Repair well , Other 2. Name of Operator ARCO Alaska, Inc. 3. Address P.O. Box 100360, Anchorage, AK 99510-0360 4. Location of well at surface 1698' FSL, 0' FEL, Sec. 2, T10N, R15E, UM At top of productive interval 1196' FNL, 1485' FEL, Sec. 1, T10N, R15E, UM At effective depth 1126' FNL, 1346' FEL, Sec.1, T10N, R15E, UM At total depth 1104' FNL, 1297' FEL, Sec.1, T10N, R15E, UM 5. Type of Well Development X Exploratory Stratigraphic Service 6. Datum of elevation(DF or KB) 54 RKB 7. Unit or Property Prudhoe Bay Unit 8. Well number 9-09 9. Permit number/approval number 76-76/90-006 10. APl number 50 - 029-20232 11. Field/Pool Prudhoe Bay Oil Pool feet 12. Present well condition summary Total depth: measured true vertical 10,800 feet 9132 feet Plugs(measured) Effective depth: measured 10,692 feet true vertical 9039 feet Junk(measured) Casing Length Size Cemented Measured depth Contractor 80' 20" 300 sx Arcticset cmt 107' Sudace 2699' 13-3/8" 6100 sx Arcticset cmt 2726' Production 10,753' 9-5/8" 1250 sx Cl 'G' & 300 sx AS 10,780' True vertical depth 107' 2726' 9115' Perforation depth: measured 10,517-10,521 ', 10,528-10,552', 10,564-10,614', 10,627-10,632' true vertical 8887-8890', 8897-8917', 8928-2971', 8982-8987' Tubing (size, grade, and measured depth) 7", 1/2", L-80 tubing w/tail @ 10,302' Packers and SSSV (type and measured depth)SAB packer @ 10,160'; Camco SSSV @~!~19t' ~ ii~ ~ ~ ~' 13. Stimulation or cement squeeze summary Intervals treated(measured) Treatment description including volumes used and final pressure 14. Prior to well operation Subsequent to operation Reoresentative Daily Avera(~e Production or Iniection Data OiI-Bbl Gas-Md Water-Bbl Casing Pressure 1260 1300 3990 5400 4590 4418 Tubing Pressure 330 430 15. Attachments Copies of Logs and Surveys run Daily Report of Well Operations 16. Status of well classification as: OilX__ Gas__ Suspended__ Service. 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed ~0,1'~.. ~ Title Sr. Area Operations Engineer Form 10-404 Rev 06/15/88 SUN/nb Date SUBMIT IN DUPLICATE DS 9-09 PERFORATING SUMMARY OF OPERATIONS ARCO Alaska, Inc. reperforated DS 9-09 in the Ivishak Sand of the Prudhoe Bay Unit on 1/4/90 (10517-10552' MD) , ref. log BHCS 11/30/76. Produced fluids were in the wellbore during perforating operations. All wireline work was done through a 5000 psi WP BOP/lubricator tested to 1.2 times the maximum expected surface pressure. A summary of the work is below: Rig up perforating unit on 1/4/90 and pressure tested equipment to 3000 psi. Open up well and produce for drawdown. Shot 10528-10552' MD, 1/4 spf. $1 Well. Shot 10517-10521' MD, 1/4 spf. Secured well. RD. Returned well back to production. ARCO ALA:~KA, INC. .,, I..IL.H~'. ~, A .., i 0 i "" '._"$ (') 4 - 4 '"' 9 i 2 .... i6 ':! .... iS'"'9i -'~ .... i 7 4-" t ":' ":' · .. ,::. .... .-" i /'1' 4' .... i'J:) ';"' .... 6 '-' 9:i '-.RI · " ,,~ ..-5: .... 2 ,::-;, .4 .... 22.- 9 i 6 .... i '5 4-.8.-.-9 i 6--.- 2 (..'.', -":1 .... 6- 9 "i 9 ..... 4 4 .... i :5 .... 9 i '::;', .... '::;', .d., .... ../'"":": 9 "i qO - Io-I s: ...... ,:i ..... :?:.i ..... o q 5; ..... .,.., ..... ',,.-.9.t i i .... i 4 .... 2"-9i ti .... 3 4 .... 2.-.-':.?i ii .... 4 4 .... 3""91 i "' "'~ "'~ .... 6'"' 9 ,:.: "- 2 ,:,.-:. t i2 .... '2'5. 4 .... t4""9i · v. i a .... '-" 3 ~ ... 'i' ... ,:', ·- ~ ,.... , .,,; ' '~" i t 4 .... 3'::'..;- 4 .... 3...-9 t T E i'"'i F:' E I:;: A 'f' U R Iii: I... E A K D Ii.:. 'i" lie C: T I 0 N L. Iii: A K D Ii.': 'i" E C': '/" I 0 N ! N,J lie C 'T ! 0 N C: B 'f' F' R' 0 }:.'.', U C' 'f' I 0 N F' R 0 D L.I C '1" .'1:0 N !... !ii: A I< D E'i" Ii.] C'i" I 0 N I... Iii: A K i.':, Iii: "f' E C 'i" I 0 N C: 01... I... A F;.'. ,," F:' Ii':: R I:: (5 A N N A / C C L../' ....I li:: i,,.! Iii: l.. R i" 1... Ii.] A K i) I!..': T Ii-:_ C'f' 1 3 N L. !ii: A k i;', !ii:'1" E. C l I 0 N F:' I T ;i~ / :[ N J E C: '1" I 0 N I N d Iii: C 1' ]: CI H I N J Iii: C 'i' I 0 N F:' F;..' 0 b U C' l' ]: 0 N C,' 0 L I.. A R F:' F;:. OD U C "l' ]: [) N 'i" ti.': H F'/' Z F:' I iq N E R F:.:UNt, '::'" .;. C A i'i C 0 F;.:'UNt., "~'" i ..... ":' ..... ~.:, PIC RUiq i, i" CAMCO RLJN t, 5" CAH(30 F;.: U N i , ..,.~'" ..:.r' C H I-';,' I..~ N i , 5 ' C, A j"i C'; O F;..'UN i , 5';" CAMCO RI. JNt , 5" C:Ai"!CO F;,' U N. t , ,...."~" 6..'" ..>'""" F.' .... A H C:: 0 !:;:l..Ji',~ t: 5" AT'LA;ii: F;.: t..I iq i , .,-"~'" C A H C 0 I;:tJNi, 5" CAHCO R t.J N i , ..,.'::"" C A M C I"!... RUN t, 5:" CAMISO Rt.JN i, 5:" CAf'iCO 5" C A J'l C 0 I:;:LJNt., _ F;.:LII-.,I .... t, '::..," F;Ai'-iCF'~. . _ RUN 1, .,':~'" CAMCO F;: t .... Ii',I t , ':".:-" [; A i"i C 0 F;.'. I..li',! t, ..,':."" I';. A i,i C 0 F:' I.. E A %' E ,iT 16; N A i's, D R Iii: 'T' t.J !:;.' N T Fi E A 'f' .1" A C H E D C 0 F:' Y A,? Fi: E C F:' I F:' T 0 I:: ~.) A i' A, I"1A V ["' A i",I I C Iii D A Y ! D ]: :':./7' R I B U T ]; 0 N :II: C E N T I'? A !... F:' :[ L. E: S 4I: C I"1 Iii: V F;: r_) iq D & ?"i :,",:E X '1" E: i'.,! :}i: I 0 iq E. X F:' L. 0 R A T I 0 N '"' E w × 0 N i"i A R A T I-.t 0 N .11, ... HOB ]:1... :,",:F' i"1 :[ 1_ L. I I::' S F:'B WF_...'.L..I.. F']:LIZ~' IR&I) :,",:B F:' X '~ .? "I" A T I:_: I'IF ' "" ( ,,. _ (-~ L. ~.,,', I, A 'i" E!: X A C: 0 · x. -,," I'-I ]: ,S' I S A D LJ P L. ]: C A '1" Iii: O F T I-.IE: L 0 [; Y 0 L.I A I.. R E A D Y R E C E I V EL I), E. X C E F:' T 'F H [:.' A F:' I ~: I,.? COF;;RECTED, F'L_Ii.=.A,~;'E THROW THE F'REVIOL!.':,,' COPY WII'H 'f'HE WF','ON(; (:iF'I:ll: AWAY, R F F' iii: R E N C: E ' A F:.'. C: C,'. C A 3' iii D H O I...lii] F:' I N A L.. C: O L.. L.. A R /F:' Iii; R F" t=' F:.: O i"? U C"I' :I: O N F:' !::.'. O I::' :1: I... Iii: F:' R O D U C T .'1; O N F:' R O F: I L.. E C 0 I... L A R / F:' E R F:' I N J F:' R 0 F:' I L.. E C O I... L. A R / F:' Iii2 R F:' I=' F;,' O D LI C: T I O N P R (3 F:' I I... E T Iii H F:' Ii"' R A '1" U R Ii"' I... E A K D E 'T' E C: '1' 11 O N ill N,J F:' R O F:' :l: I... FZ F:' R O D I..)C T 'Il O N P R O F' I L. E I N,J F:' F;,' O F:' i I... E 1... E A K D E T E C: T I O N (30 L_ L A F:,'/' P Ii:' R I:= F:' R O D U C: l' 1' O N P R O F I L.. E J Ii"' W Iii L.. R Y F:' R O D U C i" I O N F:' R r) F' I L.. E P R O I) U C T I O N F:' R O F:' I I,.. E F:'F~ I..~'H ANAL..Y~' I.?; 1_ E A t< D E T E C 1F I O N L.. E A K D E T E C l' I 0 N I=' R O D U C T :l: O N F:' I."c O F-' :r LIE F;,' LJ iR U r,J f:;..' U f'..~ R U N R L) N R U i".! F;.', U N R U N F;: i..) I:i.: U N R IJ r..~ R U H IR t..) N R U N F:,' U N R !.J N I::,' U N F:,' LJ N R U N R U N R I.J N i; i, !, i, i, i, i, i., i, i, 1, i, i, i., t, t, t.. ,'-I_E:.F,,.~E i.'} I[~N AND F;.'.ETURN THE A l 1 ~-,~[,HED R Ii." C: E I V Iii D B Y ._~ ......... I..I A",/E A N il: C: E D A Y ! ,S' t..t A R C) N W I L..,:? 0 N A i" 0- t 5 2 9 C 0 F:' Y A &' FL: E C: Ii!: I F:"l" 0 F:' D ~ 'l' A I::' fl ..) I:' il .., c:.' tl .,~ .,,, t:;,' II I::' II I::~ II ,.: (:~...5 I:[' II ,./ ..~ -- . DI$'fRIBUI'ION :x- 'i" I"! E C 0 R R E C'T' -x.-:,~. 'T' I--I E C 0 I::: IR Iii: C F' !'-i I L. L. I F:' $ F:' B W E L. L F:' I I... Ii:.,.: ~'' R & D · ,-'"' B F:'X · .- .~ 'i" A l' Ii:'. Ol:: A L. A 3' I< A T E X A C 0 ED AI::'I~: I::'OR t3-5 I,S' 5:0-029'-20626, AF,'CO ALASKA~ P~ 0, BOX ANCHORAGE', ALASKA DATE ' 6,"2(D/9(D REFERENCE]' {"~F~C[) CASED HOLE F'INAL£.' 9 .... 6 9-ii 9-';"' () y-'-.._' 4 :. ~:o _;. i2-4A i:3-7 5-28-9,3 6 - S- 9 ,:-} 6-3-9() ,':::, - 5 - 9 ,::';, 6 ..- S - 9 ,::.:, ~':., - 4- 9 (3' 6 -" ~.t - 9 ,':; 6--4-9,:-} 6 - ,¥ - 9 (:} 6-4-9,:::, d:.-- ,q...- 9,S~ S - :$ ,:-') - ':?,:Z~ _;. :=, f.~ -- .. ~, F'F;:Oi)UC:"t"I ON F'F~'.OFIL. E SUF;:VE=.Y TEHF'EF:ATUF,'E LOG T E HF:'EF~:A T LIF;:.E LOG TI.=NF'ERA'TURE SUI;.'.VE Y T E NF'EF.:A T LIr4.'.E .S' U F;.'. ¥ E Y TEHF'ERATUF:E TEHF:'EF;.:A T U F..'E TE HPEF:ATUr-;..'E $1JI;,'VE Y ]"EHF:'EF.:AT URE LO5 TEHF'ERATURE StJF:¥1F ¥ T E' H F:' E F;.'. A T U F;-'. E LOG LEAK DFZ'i"ECT I ON T['£HF'/SF'Ii"~i'-,!EF~.: G/'L. SURVEY RUN i, RUN i, 5" F;.:t. Ji'.! i , 5." Iq:UN i, 5" F;~UN. i, _.'.':" RUN i, .5':" F..'UN i , 5. F;:UN i , 5" Ri_ii'.!i RUN i, 5" .. RUN i 1;,' U N. i , _,.':: F.:~IN_ i, .~. (:'.: A H i'-:: (] C A i'd C: [) C: A i"'i C 0 C A H C: Ci C ~'::~ ~'"~ C': O C A f.i C: 0 C: Fa ~','~ C: 0 C: A r'i C O C A ri C': [) CAMCO C A ri C F) PLEASE S:[(.~N AND RETURN THE A'FTACHED COPY AS I:;:F'CEI_'F'f' OF DATA. I:;.'. [: C: [-~. ]: ',/E: D BY ~"E~.'~ N:[CE DAY! JUN 2 2 1990 ;':-: A L L ¥ H r). F' ,~':' E C K E'.. F',. Alask,3. Oil & Gas Cons. Comm't$$ion A T 0- i '5 2 ?' Anchorage A F' F'R 0 V E: D ._..~.}.'_ 'i'F.'.AN S :~ 9(-}226 i) i ;:?TR I BUT I ON · '" CENTRAl_ FILES .11. .,- C I.-t IE V R 0 N · :II:EXTENSION EX PL. OF;,'AT I Oi'i -'~ EXXON HAR~THON · $ NOBLE I:'H :[ I..I.. :[ F'Z F'B WELL. F'IL. ES R & D '"' BF:'X '"' STATE 0i= ALA£'KA "'1I" T E X A C: 0 ARC[) ALASKA, INC. F'.O. BOX i¢0S6~'J ANCHORAGE, ALASKA DATE' 4-27-90 REFERENCE: ARCO CASED HOLE FINALS 2-4 t0-t2-89 F'ERF RECORD RUN 4.-4 4-S-90 PRODUCTION PROFILE/PI T3' RUN 4-5 4-5-90 F'RODUCTION F'ROFILE/F'ITS' RUN t 4-27 t2-9-89 PERF RECORD RUN 5-t6~ t0-t2-89 F'ERF RECORD RUN t 6-t t 0-2'?-89 TEMF' RUN 7-i t2-24-89 PERF RECORD RUN 7-t 4-7-9¢ PRODUCTION PROFILE RUN 7-2 4-7-90 PRODUCTION PROFILE RUN 7-2e 4-6-9r~ PRODUCTION PROFILE RUN 7-2:~ t :2-".24-89 PERF RECORD RUN 9-9 4-8-9e F'RODUCTION PROFILE RUN tS-4 it-25-89 PERF RECORD RUN 1 t4-56 t2-2e-89 PERF RECORD RUN t 7-5 t 2-8-89 COLLAR RUN F'LEA~'E SIGN AND RETURN '[HE ATTACHED COPY AS RECEIPT OF DATA FILS' CAMCO CAMCO HL,? fILS I.'IL:~ HL£' C A M C 0 CAidCO CAMCO I--IL. £' CAMCO HL.~' HL,S' HL£' RECEIVED BY HAVE A NICE DAY! SALLY HOFFECKER AT0-t529 DISTRIBUTION CENTRAL FILES ~,~ PHILLIPS CHEVRON F'B WELL FILES D & M R & D EXTENSION EXF'LORATION ~~ BPX EXXON $ STATE OF ALASKA MARATHON TEXACO MOBIL * THE CORRECTED API~ FOR 4-27 ...., :....... : ..... ; .. ,: ~: ... t% 2 .... 2 7 2 .... ~'::!: .... ':i;"'::) C: iii': "f' t::'. !. 2 "" :? ",:' ....."::' ..... .....::: ..... ::.:', "':',.... C: iii: 'i", i';.: ',..., ~ ~".~.. --:'-'f. .... ,:!~ :~?: 'i i:i .... ,::;,,.h :'~ I~.1' '"- r, .... i::, ::' i:i'l ii'..! .... . ...... L.i... ~.- ,".... , I... F,: F:' , .... '::' ..... " ;.?: '"' ..::!; .... ':.]; ~'"", J::' Iii: J:;.'. J::' J:;..' Iii: C: ()J:;..' )) F;:I il'...! ':i; ...... ::;' *, ....... '!. .... ':i-:',:) F:'lii: t:;,' F:' FL: ii:. C C} F;..' :l:) i:,.:! i".! ':i.:' .... 'i ..;-'::' i .... "~, 'i .... ::i.:' .":;.... J::' iii: J:;..' J::' ,..t:;' li~. ,....i ..... I i:{:. J) t',.: i..J r--J. '"' i..' ':~' :', 't ~'!!; .... 6 ..:."':. ..... ....."':. ..... '::.:'.. ''''''~:.. 'i" !.J i:i", ]: i".! (:;. t:" .... i i".i L.., II... i,. l:;..' Iii: C: ()i:;.' :(::' 1:;.: i IN "i -"'~ .... "::' (."~' ':' .... , ...,. ,. .........'7 .'--:..i..' (::: F:' Ii!: F;..' I': F;.: Jiil i:; C F;.: 0 i~,~ LJ ,u:' i.,.i ...... i":, i.,,i 'j ..... i ,.-.."': ..... ......"': ...... :? ;'";:.. F:' Iii: F': J::' F,.: iii: i"; ........ I".J 1:;.: ):) j:,.:i IH F;.: E: C: ii{: ]: V t!!:).') :i:i.: 'r" :J',: C ii!: N 'i" F;: ~':':',' !... F:' :1: L. l!i: .,."" ,...."'" t"1 Iii: 'v' F;..' i:i N. Iii: × 'i" iii: i',l ,? :t: C) i'.l Ii!: × F' 1... 0 I:;.'. (':'~ 'i" :i: C) N t:i: X X i:) N H J':h I:;; ~'"'~ 'i" I"i 0 N :Il: H i) B :[ L P .% 0 ,. B 0 X i ,:-) (') :-~ 6 () ANCHORAGE: ALASKA D A T E: · '2 - 9 - 9 ,'3 F,'EFEF,,'ENCE' ARCO PRESSURE DA'TA !--,io / i - 2:5 2-2¥ 2; - 6 5-6 ..'3-8 %.: S--2S S_. :.~ ,.:; 7-33 7 - S 4 9-9 9-S4 ~ 6- 9 ~6-t8 ii ii i it ii il ii ii ii ii i(.} ii ii ii ii ii -- i '7--89 .-8-S9 ~ 8 -- ':::' 0 -i ! .... S9 - i · - 1 6-89 · - i 2--:39 -9-i_'39 - i ;.":'- 89 -9-89 · - i ¢-89 --'-'~- 89_, - i 5-89 - 27- :~':.;" -t6-89 -i6-89 - i t -89 - t 9-89 -9-89 B H F'--,':i: T A T :[ C' G R A i) I E N T BHF ....STATIC (:;RADZENT BHF ..... FI...OW ]: NG[:-RAD t ENT BHF ...... FLOW I N(;- GF:ADZENT BHF ..... F:L. OW :1: NC' GRAD I ENi" B lq F: ....... S T A 'f' :[ C (':- R A D l E N'T B i"t F ...... F'L. OWi NC; GRADIENT BHF ....... Fi..F)WING GRADIENT :E':.' H F: ..... t::i...OW i NC; GF;:ADI ENT B t"t F .... S'¥ A T :I: C C- R A D I E N T BHF ....STATIC GRADIENT BI-iF ..... F'RESSUI;..'E FALL-OFF Bi"IF ..... PRESSURE FALL-OFF Bt-IF ..... F:LOW :[ NC- GRAD I EN'i' Bi-IF ..... STATIC GRADIENT BHF'--STATIC GRADIENT BI-IF ..... £'TATIC GRAI)ZENT BHF'--ZTATIC GRADI'EN'F BHP--STATIC C-RAD I'EN i" PI_EASE SIGN F:.'ECE I VED BY HAVE A NICE SALLY HOFFEC ATO-i 529 AND F,'ETURN THE A'TTACHIED COF'Y AS I~.:ECEIF'F OF: DAY ! KEF: FEB 1 5 ! 90 ,_,_taaka Oil & Gas Cons. Corn s$i -J3 Anchoragei APPROVED '/RANS.'~ 9£:, C A ~q C (] C A M C 0 C' A H C'. 0 C A M C 0 C A M C 0 C A H C 0 C A M C 0 C A M C 0 C A M C 0 CAMCO CAMCO CAr!CO C A M C 0 CAM[;[) CAMCO C A M C 0 CANCO C A M C 0 CAMCC~ DATA. DISTRIBUT]:ON CENTRAL FILES .~ F'FI ILI_I F'S CHEVRON F'B WELL F'IL.E,';' D & M :~ R & D EXTENSION EXPLORATION ~- BF'X EXXON ~'"' ,.,¢'i'ATE OF ALA£';<A N A R A 'f'H ri N :;,':T E X A C 0 MOBIL ARCO Alaska, In( Prudhoe Bar cJngineering Post Office Box 100360 Anchorage, Alaska 99510-0360 Telephone 907 263 4248 Donald F. Scheve Operations Engineering Manager January 2, 1990 C. V. "Chat" Chatterton Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Re: Well No. 9-9 Permit No. 76-76 Dear Mr. Chatterton: Attached, in triplicate, is the Application to be performed on the above-referenced for Sundry Approval detailing work well. Very truly yours, D. F. Scheve DFS/GSS/sbm Attachment cc' J.S. Dietz, BP Exploration J. Gruber- ATO 1478 PI(DS 9-9)W1-3 ARCO Alaska, Inc. is a Subsidiary of AtlanticRichfieldCompany AR3B--6132-C f-'~ STATE OF ALASKA ALASK/'~ ~LAND GAS CONSERVATION APPLICA RON FOR SUNDRY APPROVA 1. Type of Request: Abandon Suspend Alter casing Repair well Change approved program 2. Name of Operator ARCO Alaska, Inc. 3. Address P.O. Box 100360, Anchorage, AK 99510-0360 4. Location of well at surface 1698' FSL, 0' FEL, Sect. 2, T10N, R15E,UM At top of productive interval 1196' FNL, 1485' FEL, Sect. 1, T10N, R15E, UM At effective depth 1126' FNL, 1346' FEL, Sect. 1, T10N, R15E, UM At total depth 1104' FNL, 1297' FEL, Sect. 1, T10N, R15E, UM Operation shutdown Plugging Pull tubing Variance 5. Type of Well Development X Exploratory Stratigraphic Service Re-enter suspended well Time extension Stimulate Perforate X Other 6. Datum of elevation(DF or KB) 54 RKB 7. Unit or Property Prudhoe Bay Unit 8. Well number DS 9-9 9. Permit number 76-76 10. APl number 50 - 029-20232 11. Field/Pool Prudhoe Bay Oil Pool feet 12. Present well condition summary Total depth: measured true vertical 10,800 feet Plugs(measured) 9132 feet Effective depth: measured 10,692 feet true vertical 9039 feet Junk(measured) Casing Length Size Cemented Conductor 80' 20" 300 sx AS cmt Surface 2699' 13 3/8" 6100 sx AS cmt Production 10,753' 9 5/8" 1250 sx C1 "G" and 300 sx AS Measured depth 107' 2726' 10,780' True vertical depth 107' 2726' 9115' Perforation depth: measured 10,564-10,614'; 10,627-10,632' true vertical 8928-2971'; 8982-8987' Tubing (size, grade, and measured depth) 7", 5 1/2", L-80 tubing w/tail @ 10,302' Packers and SSSV (type and measured depth) SAB packer @ 10,160'; Camco SSSV @ 2191' 13. Attachments Description summary of proposal 14. Estimated date for commencing operation January 1990 16. If proposal was verbally approved Name of approver Date approved Detailed operations program BOP sketch X X 15. Status of well classification as: Oil X Gas Suspended Service 17. I hereby~ certify that~he foregoing is true and correct to the best of my knowledge. Signed ~, ~---~/~)~ Title Operations Engineering Manager FOR COMMISSION U~l= ONLy Conditions of approval: Notify Commission so representative may witness Plug integrity BOP Test Location clearance ~¢ ~ Mechanical Integrity Test Subsequent form required 10- ORIGINAL SIGNED BY I..0NNIE G. SMITH Date [Approval No.~)~ _ ~:~(~ ~ Commissioner Date //-" ~//- ~/~ Approved by order of the Commissioner SUBMIT IN TRIPLICATE Form 10-403 Rev 06/15/88 DS 9-09 PROPOSED RE-PERFORATIONS API # 50-029-20232 PERMIT # 76-76 ARCO Alaska, Inc. proposes m-perforations of cement squeezed perforations in DS 9-09 within the Sadlerochit Sand from the Prudhoe Bay Unit. The proposed perforation intervals are as follows: Interval, MD Footage, ft. SPF Zone 10517-10521 4 1/4 2A 10528-10552 24 1/4 2A Reference Log: BHCS (11/30/76) Well 9-09 is a producer that is currently flowing. Wellbore fluids present when the perforations will be shot are oil, gas, and water. The expected bottom hole pressure is 3680 psi. All wireline work will be done through a 5000 psi WP BOP/lubricator, tested to 1.2 times the maximum expected surface pressure (diagram attached). 3 1. 5000 PSI 7" WELLHEAD CONNECTOR FLANOE 2. 5000 PSI WlRELIN£ RAMS (VARIABLE SIZE) 3. 5000 PSI 4 1/(5" LUBRICATOR 4. 5000 PSI 4 1/6" FLOW TUBE PACK-OFF ii' ~ i ,I H 1 REL I NE BOP EOU I PHENT ii ARCO ALASKA, iNC. BOX i00S60 ANCHORAGE, ALASKA '995i~ DATE: ii .'-7-89 REFERENCE' ARCO CASED HOLE FINALS ,,'i-S4 i0-i4-89 PRODUCTION PROFILE RUN ;2-2~-3 t 0-25-89 GAMMA DSN RUN ~-27 8-26-89 F'ERF RECORD RUN ~,"5- i i i-9-89 COLLAR/F'ERF/F'ACKER RUN ~ 5-':27 i i-4-89 CBT RUN · "" 6-S t i -2-89 FM 'i'EMP RUN 4 -i4 ii-:5-89 PRODUCTION PF,'OFILE RUN '-TA i ~,-25-89 F'RODUCTION F'IkOFILE RUN ~'~"7-i7 i~-25-89 PRODUCTION PROFILE RUN ~"";;-2~, i i-6-89 PRODUCTION PROFILE RUN /~.'-27 ii-4-89 INJECTION F'ROFILE RUN .~/7-28 i t-:5-89 F'ITS RUN ~"7- 29 i i -4-89 F']:TS RUN /"7-:5~ i i =:'--89 PITS RUN 7-:5:5 ii-5-89 INJECTION PR'OFILE/TEMP RUN _ '~' 9-9 i ~-'77-89 PRODUCTION PROFILE RUN .,~ 9-i i i (~-"28-89 L. EAK DETECTION RUN 9-28 i ~-:5 '~-89 TEMP/GR RUN . 9-:58 ii-5-89 F'ERF RECORI) RUN · .-. ii-5 9-2-89 PERF RECORD RUN .,...-~.i-5 t '~-27-89 PRODUCTION PROFILE/LEAK DEl'. RUN · ...-,/i '2-i i i (~-28-89 LEAK DETECTION RUN .~"'~- :5 i i .3'-27-89 CC/_/TEMP RUN ~I2 :5:5 i~-26-89 INJECTION PROFILE RUN ./i 4-4 i i -6-89 COLLAR/F'ERF RUN .?i5-i:5 ii-7-89 TUBING CUTTER RUN -i 5-i S i ~-28-89 TEMF' RUN --" (') i i-4-89 ..,NL RUN ~,,/i 7-4 9-8-89 F'ERF RECORD RUN PLEASE SIGN AND RETIJ~qN THE ATTACHED COPY AS RECEIF'T OF DATA RECEIVED BY . · HAVE A NICE DAY!' - NOV SALLY HOFFECKER A T O- t 5 2 9 Alaska 0ii & Gas Cons. CommissiOr~ n P F'R 0 V E D _ _ · TRANS~ ~394o6 Anchorage DISTRIBUTION CENTRAL FILES ~ ~- PHILLIPS CHEVRON F'B WELL FILES D & M R & D EXTENSION EXPLORATION ..~' BF'X EXXON ¢ STATE OF ALASKA MARATHON ~ * TEXACO MOBIL CAMCO I--tL£ FILS A FLAY SCH CAMCO CAMCO CAi'riCO CAMCO C A M C; t] CAH!7.~-'~ H R S FI R S HR,? CAMCO CAMCO CAMCO CAMCO $CH HL$ CAMCO CAMCO CAMCO CAMCO Ai"LA2 A T 1_ A 2 CAMCO HL5' * THE CORRECTED AF'I~ F'OR i i-5 IS 5(~-~'}29-26,670, ....... ,- ,-. n r', r_, ,..- r, -r c' r, ,',:,'r~ ~-ng, ~'.~-~ T.? ~-6,29-"2(,~60i ~ ARCO Alaska, Ir Prudhoe Bay r..,,gineering Post Office Box 100360 Anchorage, Alaska 99510-0360 Telephone 907 263 4248 Donald F. Scheve Operations Engineering Manager ORIGINAL September 6, 1989 C. V. "Chat" Chatterton Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Re: DS 9-9, Approval No. 8-637 Dear Mr. Chatterton: Attached is the Report of Sundry Well Operations detailing work performed on the above-referenced well. Sincerely, D. F. Scheve DFS/MJB/jp Attachment cc: J.S. Dietz, BP J. Gruber, ATO-1478 PI(DS 9-9) Wl-3 ARCO Alaska, Inc. is a Subsidiary of AtlanticRichfieldCompany AR3B --6132-C STATE OF ALASKA ALASt' ,_ AND GAS CONSERVATION ('~- ~IISSION REPOR'I OF SUNDRY WELL OF,-rIATIONS 1. Operations performed: Operation shutdown Stimulate Pull tubing Alter casing Plugging Perforate X Repair well Other X 2. Name of Operator ARCO Alaska, Inc. 3. Address P.O. Box 100360, Anchorage, AK 99510-0360 4. Location of well at surface 1698' FSL & 0' FEL, Sec. 2, T10N, R15E, UM At top of productive interval 1126' FNL & 1346' FEL, Sec. 1, T10N, R15E, UM At effective depth 1126' FNL & 1346' FEL, Sec. 1, T10N, R15E, UM At total depth 1104' FNL, 1297' FEL, Sec. 1, T10N, T15E, UM 5. Type of Well Development Exploratory Stratigraphic Service 6. Datum of elevation(DF or KB) 54' RKB 7. Unit or Property Prudhoe Bay Unit 8. Well number DS 9-9 9. Permit number/approval number 76 - 76 / 8 - 637 10. APl number 50 - 029 - 20232 11. Field/Pool Prudhoe Bay Oil Pool feet !2. Present well condition summary Total depth: measured true vertical 10800 feet Plugs(measured) 9132 feet Effective depth: measured 10692 feet true vertical 9038 feet Junk(measured) Casing Length Size Cemented Measured depth True vertical depth Conductor 80' 20" 300 sx AS cmt 107' 107' Surface 2672' 13-3/8" 6100 sx AS cmt 2726' 2726' Production 10726' 9-5/8" 1250 sx CI 'G' & 300 sx AS 10780' 9113' Perforation depth: measured 10564- 10614'; 10627- 10632' true vertical 8926 - 8969'; 8980 - 8984' Tubing (size, grade, and measured depth) 5-1/2", 17#, L-80, PCT @ 10142' MD; 4-1/2", 12.64f, N-80 PCT w/tail @ 10302' MD Packers and SSSV (type and measured depth) Baker SAB Packer @ 10160' MD; Cam .. 191' MD 13. Stimulation or cement squeeze summary Intervals treated(measured) SEE ATTACHED Treatment description including volumes used and final pressure ! 191J9 A ' ch ia e 14. Prior to well operation Subsequent to operation Representative Daily Average Production or Injection Data OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure 1147 1762 8598 .... 544 64 0 Tubing Pressure 333 414 15. Attachments Copies of Logs and Surveys run Daily Report of Well Operations 16. Status of well classification as: Oil X Gas Suspended Service 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed ~"/~'~,~~'~-~- Title Operations Engineering Manager Form 10-404 Rev 06/15/88 D.M. FIFE Date SUBMIT IN DUPLICATE DS 9-9 DESCRIPTION OF WORK COMPLETED CTU CEMENT SQUEEZE FOR WATER SHUT-OFF 9/21/88' MIRU CTU & Stimulation Equipment. PT Equipment to 4000 psi. RIH w/CT and washed perforations at: 10564- 10614' MD Ref. Log' BHCS 11/30/76. 10627 - 10632' MD Pumped the following treatment: 69 bbls 12% HCI w/25% Xylene, followed by, 82 bbls 12-3% HCI-HF, followed by 63 bbls NH4CI Water. Displaced w/ Diesel. POH. Rigged down. 9/29/88: The Squeeze was performed as follows: MIRU CT & Cementing Equipment. PT equipment to 4000 psi. RIH w/CT and fluid packed wellbore w/seawater. Pumped 74 bbls cement, squeezing perforations: 10564- 10614' MD Ref. Log: BHCS 11/30/76. 10627 - 10632' MD Contaminated cement with 147 bbls contaminant. 9/30/88: Cleaned out contaminated cement from WB. 10/17/88- Reperforated- 10564 - 10614' M D 10627 - 10632' MD Ref. Log' BHCS 11/30/76. Returned well to production and obtained valid production test. s P ! .. ~ z~'¢ % AF,'C:O AL.A.':'."J<A, ZNC , F' ,. 0., B 0 X i (:) () 3; 6 E:' ' J.~ L~,~. ~, A 995'~ ¢' ANCHOF(AGE, '* ......z,,, DATE · 7-28-89 REFERENCE' ARCO F'RE3~3'URE DATA 5--i 5 '?'-7-89 BHF'--5']'A'I"IC' GRAD]:ENT HL_5' S--::22 '7-9.-89 BHF'--.STAT IC GRADIENT I-t I.. ~,~' 4-i 6--2F-~-89 Bii F'--~,"[' A T l C GRAD]:ENT HL_£' 4-26 7-i 2-89 BHF ......,':_,_:TAT:r_c~SRADIEh.!T CAi'~CO 7--i 6 6-3,5--89 BHF'--5'TA f'I C ? -::'!:, 7 -.- 5 - 89 9-'7 ?--Z.-89 BHF: .....5"I"A 'T I C GRaD ]: EN'T t--tL.Z ?-9 '7--6'-89 BHF .... STATIC t~-RAD ZENT HL.Z 9-24 7-7-F:9 BHF ..... STATIC GRADIENT HLZ 9-28 7-6-89 BHF'--~'T,qTi C C-RAg_'[ ENT HL$ i i -2_; 7-i 2-89 BHF'--5'TATI'C GRADiEN'F CAtnCO i 6-i 7-5-89 BHF'--,*.;"i-ATIC L;RADiEN'F HL3' i6-6 7-8--89 BHP--ZTA'FIC GRADIENT HL3' i 6-8 7-8-89 BHi- .... ~'-I"ATIC [;F;,'£-~D:LEN [' HL_3' ~ 6-~ '') -' 89 _ .. ~'-9- BHF'--S'-FAT I C GRAD IEN-I" HL,~' i 6-2() '?'-8-89 BHF'--5;TATIC GRAD]:ENT · i 6-24 7--5-89 BHF .... 5'TATIC GRADIENT .. I--ILS' . F'WDW2-~ 7-9-89 BHF'--5~TA'i"IC GRADIENT CAMCO F'I_EASE SIGN AND RETURN THiS AT'FACHED COF'Y AS' RECEIF'T OF DATA. RECEIVED BY :~. HAVE A NICE DAY, j i~~".~-~.~-~:~ ,~ ATO-t 529 ~'- DIg'TRIBUTION CENTRAL FIE-E,~' ~'" CHEVRON ......... . ~ D & M . EXTENSION ~' EXF'LORA'I'I ON -.- EXXON" HAF:ATHON ~ MOBIL "~ F' I--t .[ L L I F' 5' PB DELL F'I:LE~' · ~ R & g ~'"- ~_~F'X '"" Z]'A'T'E OF AL.A,x~'KA -.- I"EXACO ARCO ALA;~;'KA, INC, P,, 0 ,, BOX t O(',"T.~6(') ANCHOI:~A(~E, AI_A..?KA. 995t I)A1'E: 7-t 7-89 RIEI::EF/ENCE: AI;:CO CASED HOI_E FINALS S-'1 t ' 6""'29-89 SF'INi'~IiER StJI;:¥EY ~.~-'t 2 6-29-89 SI:'INNI.::-I:;: SUI:iVEY T.'~ .... t 5 '? -.'7- 8 9 I"E i"l F:' ,.'S' U R V E Y 3-22 7-9-89 'I"EM F' StJRVEY ':'5 -. ;.'~ 7-.. i -~-t9 'I'IE HF' SURVEY 9-'2 7"'5'-89 1'EMI::'.%tJl:iVl:; Y 9-'6 7-'5"89 TIEHF' SLJI~VEY 9-"7 7-5-89 I"IE MF'SURVEY 9-'9 '7 ~"5"' liic? I'E~'IP SUI:iVEY 9-28 7-5-89 '~' IE i'1F" S'URVEY ti-'2 7-?-89 I'EHP $'URVEY t t-7 7"'9-89 'l'El'il":" S'URVEY i t .... i 6 7'"t 0-89 l'E~'ii-'-" SURVEY i 2-25 6-:$0-89 'T'EHF' 2'tJRVEY t 2!"2."5 6-'S0-89 ,5.'F'INNIFR SLJI:~:VEY ~ 6-20 7-8-89 TEItP S'{JRVEY F:,'UNt, 5" I:/UN t , 5 ' I:;:LJN t , '.:.,'" I'(t.JN t, 5" Fi:UN t, '.5' RUN ~., ':~' I:i:LIN t, 5" R U N F/I.JN t, :!5" RUN RUN t , RUN RIJN I'.:,'tJN 't, .5' RlJN I, 5" I:;: U N t, F'I_EASE SIGN AND .,. '1" RE.I JkN I"H RECEIVIED BY FIAYE A NICE DAY! SALLY HOF'I::'ECK ER A'l"O- 1 529 I) ISTRIBUTION r-', H i L 1.. I P S F'B WELL. FIL. ES R & D BF'X STATE OF ALASKA TEXACO 0 l' I $ 0'¥ ]: S 0 'i' .I. 5' 0 i" i S 0/' '.[ ,'."; C) T ,11S 0'1' i $ 0 'l" ]: .? 0 T I 0 '¥ I ;~," OTIS;' OTIS OT I,.S' 01' l 01'IS ARCO ALA£KA: P. O, BOX ANCHORAL;E: AI_A~KA 995t ('~). DATE:' 6-'i 4-89 REFERENCE' ARCO PRE£,S'URE DATA 2- ~i J 5-4-89 BH, P--5,'TAT l: C £~RAD ]~ ENT CAF'~CO ,3-9 5-22-89 BHF'--t--LOWI NG (;;RAD lENT CAMCO 4 - i 5: 5 - i 9 -- 89 B I.-I F .... S' T A "f' :i: C G F;.' A D ]: E]'~ '¥ C A i~ C ('3 4-:3,:'} 5-i 8-89 BiqP--FI_OWIiqG GRADIENT CAI'qCO 4-3'~,~. _..~-i 7-89. BI.-IF .... S'TA'T l C. GRADIENT CAMCO 6-~8 5'-22-89 BHF ..... Y,'TA'TIC GRAD]:ENT CAMCO 9' - S 4 -28 -" 89 B H F ....... F L 0 W l N (; ti R A D I E: N T C A M C 0 9-6 4-'2':?-8:...:' BHF'--FLOW'[ NG C-RAD'r EN'i' CAMCO 9'--7 4-3,3,-89 BHF'--F'LOW lNG GRADIENT CAMCO 9-9 4-2',-'"-89 BI.{F'--Fi..ow'r NG GF:ADIENT C~'~MCO 'i2-~ 5-2~--89 BHF ....Fi_OWING CfRADIENT CAMCO · i 4-2 4-{ .'7'-89 BHF'--,"gTATIC GRADIi'.<N"I' CAMCO PLEASE SIGN AND RETURN THE ATTACHED COPY AS RECEIF'T OF' DATA. ~'ALLY , A r o- ~ ~ 2 9~ ~st~ oi~ ~, ~s cons. c~m~ss,o, r~: A N Anchorage DISTRIBUTION CENTRAL FILE~ CHEVRON D&H EXTENSION EXPLORATION EXXON MARATHON MOBIL PHILLIPS F'B WELL FILES R & D BPX ~'-'T'AI'E OF Ai_A3'KA TEXACO ARCO ALA~;'KA: INC., F', O, BOX i ANCHORAGE, ALA S'I',' A F;,'EFERENCE' ARCO CA~JED HOLE FINAL£' i-i9 fi-'i -89 2 '- '2 t 5 - 4 - 89 5: -' 3 5 -' 5: '- 89 7-i i 4-i 5-89 7-i 4 4-5;3-89 9-S 4-28-89 9 - 6 4 - 29 - 89 9-7 4-~0-89 ~ ._ o 4 - 27 - 8 o i i - t 4..-29-89 i Z--26 4-26-89 iS-SS 4-26-89 i 7- 8 S - 27 - 89 WGI-2 5-2-89 F'RODUCTION F'ROF'I LE COLt_AR/F'ERF COLLAR/F'ERF F'RODUCTION PROF'.'[I_E ..,ULLHR/F'ERF F'ROD~JCT!ON PROFILE F:'RODUC'f'ION PROF'ILE F'I:;:ODUCT I ON PROFILE PRODUCI"I ON PF,'OF I L l:'i: COLLAR/PERF FLOWMETER I"EMP ,TURVEY FI_OWME'FER '¥EMP .?URVEY COI_LAR/PERF PFC PLEASE 3'IGN AND RETURN THE ATTACHED COPY AS' RECF I F'T RtJN RUN RIJN._ F;:tJN RUN RUN RUN RUN RUN. RUN RUN RUN R. UN IN:UN OF DAi'A. C A M C C, A T L. A C A I'd C 0 ':': A M (} U C A i,i {2 t) C A M IL; L.I C A ri c 0 CAMCO HLS A TLA'/,' RECEIVED BY HAVE A NICE DAY! SALLY HOFFECKER ATO-i 529 ;, "t 'l 'I ' i ~ ~F F ROY ED _ 'rRAN2'$ 89],.29 DISTRIBUTION CENTRAL FILES CHEVRON D & M EXTEN~'ION EXPLORATION EXXON MARATHON MOBIL · .-" F'H!LLIPS F'B WELL FILES R & D -,--"- BPX ~' -,.gl'ATE OF ALASKA ~ TEXACO Oil & Gas Cons. Czm:x~sc' .,, Anc~,orage ARCO ALASKA, F'.O. BOX ANCHORA6E, ALASKA 995~ DATE' t 0-2t -88 REFERENCE · "~-i 4 ,5-7 `5-t5 · ,-,i ,-,~. --.~ 9-i 9-9 9-i S t 5-2A t 5-9 t~-22 i 5-'~;~. PWDW2-i PLEASE SI ARCO CASED HOLE FINALS 10-8-88 PERF RECORD RUN i, t 0-5-88 COLLAR/F'ERF RUN i , '¢-i 8.-88 INJECI'ION PROFILE RUN i, t 0-7-88 COLLAR/PERF RUN t , 9-2S-88 COLLAR RUN I , 9-i6-88 F'ROI)UCTION PROFILE RUN i, t~,-i7-88 F'ERF RECORD RUN i , 9-2i-88 PRODUCI'ION F'ROFIL. E RUN i , 9-25-88 PRODUCTION F'ROFILE RtJN i, i 0'-8-88 COLLAR/PERF RUN i , iO-&"r88 F'RODUCTION RtJN i , t 0-7-88 CNL-GAMMA RUN t , i 0-7-88 COLLAR/F'I::I';,'F RUN t , t (:)-6-88 COLLAR/PERF RUN t , i (-)-i 3-88 COLI..AR/F'ERF' RUN i , 9-i 8-88 TEl'iF' F<UN t, GN AND RETURN 'THE AT'f'ACHED COF'Y AS RECEIF'i" OF DATA,, 5' 5' 5" 5' 5" ~,-~ 5' 5' 5' 5' 5' S C H ATLAS CAMCO A I'L.A.S' CAMCO CAMCO $CH CAMCO C A M C 0 ATLAS SCH ATLAS ATLAS ATLAS ATLAS CAMCO RECEIVED BY HAVE A NICE DAY! SALLY HOF'FECKER ATO-~ 529 TRAN~ ~:886t 8 /~ APPROVED Commission Anchorage DISTRIBUTION '.f,: CENTRAL FILE.S' ~ F'HI LL. IF'$ ¢ CHEVRON F'B WELL FILES D & M R & D. ¢ EXTENSION EXF'LORATION ¢- SAF'C ~ EXXON ~ STATE OF' AL.A,S'KA MARATHON .~ ] E×~t., d ,,~ MOBIL THE WRONG AF'I ~ IS PRINTED ON THIS ARCO AL..A.?K A, P,, O, BOX ANCHORAGE, ALAS'KA 995~¢ DATE: 9.-S0-88 I~EF:'ERE£NC;E: ARCO CA~'ED HOI_E I:'INAL. 5' t--8 9-~ 8-88 --.t () 9-26-88 -. '22 9 .-.- 2 ?' .... 88 -'~ '~ 9 - 2 ;3 - 88 3-~ 9-.. ~ -88 ;3-.-4 9-S-88 ;3 .... 2~ 9-2-88 ;3-22 9.-~ .-.88 3-27 9-2-88 5-S 9-9-88 5-..~ 9-9-88 6-~ 4 9-4-88 '7-. t 3 9-2S-88 9.--9 9-3-88 t 5-9 9-5.-88 tD-t OA 9-2t -88 t 5:-t OA 9--2t-88 t 5.-'~ 2 9-t 4..-88 t 5-t 5 9-.3-88 t 5--t 9 9-20-88 t~-q' -.. '~ "~.:. ~ 9-23-88 t 6-4 9-2-88 i 6-.t 2 9--~ t 7 - 4 9- ~ 0'"' 88 t 8- t 9"- t t -88 I NJECI"I ON F:'ROI::'I L.E I:'ERF RECORD AMENDMENT TO ACBL OF 5-t8'"'82 F:'FC F:'R 0 D LJC T I 0 N P R 0 F I L. E INJEC'I'ION F'ROFIL. E f" R 0 D U C 'f' I 0 N P R 0 F:' I L. E F'RODUCTZON I:'I;'.OF:'ZLE P R 0 D U C T I 0 N P R 0 F' I L.. E F:'RODUCTZON F'ROFZI_E P R 0 D LJ C 'F I 0 N P R 0 F' I L. E I:' ~ l'6' C 0 L. L.. A R / F' E R F' PRODtJC'f'ZON PROF.[I_E PRODUC i'I ON F'F~OF' I L.E ..... F:'O~' T-5' T1 H, VER'r I LOG HAGNE:t..O[; F:'RODUCi"ION PROF'iLE F' R 0 D U C l' i 0 N P R 0 F:' I L.. E COMF:'L.E'f'Z ON RECORD C 0 L [. A R GAMMA RAY F' F< U D U L: '1 i U M F' F,'. U F' I L. E F:' I T Y I::'I..EASE SIGN AND RE'rURN AS F;:ECEIF:"F rECE ]: VE > e,Y .............................................. OGt:..U%.t988 HAVE A NICE DAY! ,S'Ai...L.Y HC)FrF:'FC.'.'K ER ATO- t 529 0il & Gas Cons. (;urmnissioll , ~ ~fichol'age I'RAN3 -,.88598 .,~ A F:' F:'R 0 V E D .............. (~ ..................................................... D 13~ i' R I B I.J '1' I 0 N RUN RtJN RtJN F;,'.U N RtJN RLJN RtJN RUN RUN RLJN RUN RUN ~UN RLJN RUN RLJN ~UN RUN RUN RUN ~UN RUN ~LJN OF DAl" t, t, t, t, 1, t, t, t, 2, t, t, t, t, t, t, 1, t, A · 5' _5 ' 5' .5 ' 5' 5" 5' 5' .5" 5' .5 ' 5" 5 ' '5 ' 5' 5' 5' '5' CAMCO SCH ~ A 'T'I.A,S' ~ ~ 'I' I.. A,g,,'"'"' CAMCO ()AMC(3 CAMCO CAMCO CAMCO CAMCO CAHCO C A H C O ATLAS' CAitCO CAMCO Al'LAX A 'f't..AS' CAMCO CAMCO S'CH ATL. A~' CAiMCO CA~ ;C u C A M C 0 CAMCO ~ C EN I'F;..'A L FILES :~ CHIEVRON D & i"l · .-'"' EX'I'FN3'ION EXF:'L_ORA'FION · ..'"' E X X 0 N MARATHON .Il. ,' HOB I L, -,-'"' f:' f'l 1 I.. L. I F:' $ F'B WELl_ F'£LI:'",S' R & D ~ 5,'APC ~: 5"f'Al'E OF' AL. ASK A :~ l' E X A C 0 ARCO Alaska, Inc. Prudhoe Bay P..,gineering Post Office Box 100360 Anchorage, Alaska 99510-0360 Telephone 907 263 4248 Donald F. Scheve Operations Engineering Manager August 17, 1988 C. V. "Chat" Chatterton Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Re: DS 9-9 Permit No. 76-76 Dear Mr. Chatterton: Attached is the Application for Sundry Approval detailing work to be performed on the above-referenced well. Very truly yours, D. F. Scheve DFS/DMF/jp Attachment cc: Standard Alaska Production Company J. Gruber, AT0-1478 PI (DS 9-9)W1-3 WELLS3/13 ARCO Alaska, Inc. is a Subsidiary of AtlanticRichfieldCompany AR3B--6132-C STATE Of ALASKA ALASKa, ,.~IL AND GAS CONSERVATION COMM,,.,,51ON APPLICATION FOR SUNDRY APPROVALS 1. Type of Request: Abandon [] Suspend [] Operation Shutdown [] Re-enter suspended well [] Alter casing L3 Time extension [] Change approved program [] Plugging [] Stimulate [] Pull tubing [] Amend order [] Perforate ~ Other 2. Name of Operator ARCO Alaska~ Inc. 3. Address P.O. Box 100360, Anchorage, AK 99510 4. Location of well at surface 1698' FSL & 0' FEL, Sec. 2, T10N, R15E, UM At top of productive interval 1196' FNL & 1485' FEL, Sec. 1, T10N, R15E, UM At effective depth 1126' FNL & 1346' FEL, Sec. 1, T10N, R15E, UM At total depth 1104' FNL, 1297' FEL, Sec. 1, T10N, R15E, UM 5. Datum elevation (DF or KB) 54' RKB 6. Unit or Property name Prudhoe Bay Unit 7. Well number DS 9-9 8. Permit number 76-76 9. APl number 50-- 029-20332 10. Pool Prudhoe Bay Oil Pool 11. Present well condition summary Total depth: measured true vertical 10800 feet 9132 feet Plugs (measured) feet Effective depth: measured 10692 true vertical 9039 Casing Length Size Conductor 80 ' 20" Surface 2699 ' 13-3/8" Production 10753 ' 9-5/8" feet feet Junk(measured) Cemented 300 sx AS cmt 6100 sx AS cmt 1250 sx C1 'G' 300 sx AS Measured depth 107' 2726' 10780' True Vertical depth 107' 2726' 9115' Perforation depth: measured 10564-10614'; 10627-10632' true vertical 8928-8971'; 8982-8987' ~bing(size, grade and measured depth) 7", 5~", L-80 tubing w/tail @ 10302' Packers and SSSV(type and measured depth) SAB packer @ 10160'; Camco SSSV @ 2191' 12.Attachments Description summary of proposal [] Detailed operations program [] BOP sketch [] 13. Estimated date for commencing operation August 1988 14. If proposal was verbally approved Name of approver Date approved 15. I herebv~certify that the fp, regoing is true and correct to the best of my knowledge Signed ~¢:¢-~ ~..~~ Title Operations Engineering Manager Commission Use Only Date Conditions of approval Notify commission so representative may witness ! Approval No. [] Plug integrity [] BOP Test ~ Location clearance I Approved Copy /,.,--) ./-) ,,,,--~ ~ /~'j ~Return~d ~ F%%%;~>v~1~. ~~~~~ Commissioner " the commission Date . 9~brrf~t"in triplicate/.~/ DS 9-9 CTU Cement Squeeze Project AFE# 797961 Subcomponent AFE# K88004 Procedure 1. Make a slickline tag run to verify the PBTD. Last PBTD was 10228' MD (ELM) on 5-7-87. 2. Do a fill cleanout to 10692' MD. 3. Surge the well with a surge tool. 4. Perform a dispersed xylene/HC1, full strength mud acid wash. Test well. 5. Change out the live gas lift valves with dummys. 6. RIH with coiled tubing and fluid pack the wellbore with filtered seawater. 7. Pump 40 bbls of cement followed by 2 bbls of water and 80 bbls of contaminant. Hold 5100 psi squeeze pressure for 60 minutes. Squeeze off all the perforations as follows: Zone Present Perforations SPF (Ref.: BHCS 11-30-76) lB 10564-10614 8 lB 10627-10632 8 8. Jet or reverse out the contaminated cement. 9. Perforate as follows: Zone Present Perforations SPF lB 10564-10614 FSD IB 10627-10632 FSD 10. Test the well. Reperf Reperf (Ref.: BHCS 11-30-76) Other Well Information: Current status: On production - gas lift. Expected static bottomhole pressure: 3780 psi. @ 8800' SS. Expected fluid in wellbore at reperforation: seawater. 6 5 4 2 COILED TUBI. NG UNIT BOP EOtU 1 PMENT 1. 5000 PSI ?" W£LLH[.AD CONNECTOR FLAhG£ 2. 5000 PSI 4 1/16" PiPE RAMS 3. 5000 PSI 4 1/6" HYDRAULIC SLIPS 4. ~)00 PSI 4 1/6" SHEAR RAMS 5. 5000 PSI 4 1/6" BLIND RAMS 6. 5000 PSI 4 1/16" STUFFING BOX 4 2 N]REL]NE BOP EOU]PMENT 1. 5000 PSI 7" WELLHEAD CONN[CIOR FLANGE :2. 5000 PSI WIRELIN[ RAkeS (VARIABLE SIZE) 3. 5000 PSI 4 1/6" LUBRICATOR 4. 5000 PSI 4 1/6" FLOW TUBE PACK-OFF ARRA AI.A~KA, TN£. ANRHARARF¢ AI.A~KA DATF' 5-5-RR REFERENCE: ARnO PRE~IRE DATA 2-7 7-6-Rffi RHP-STATTC GRADTENT ~-5 4-iS-RR RHP-2TATT~ GRADTENT ~-20 4-~5-~R ~HP-2TATT£ CRADTENT 7-22 4-~-~R ~HF'-2TATI~ GRADTENT 7-24 4-~5-RR ~HF'-~TATT£ GRADTFNT ~-2R 4-tA-RR ~HF'-~TATTR ~RADTFNT ~-t 7-~-R8 RHF'-FI..flNTN~ ~RADIENT · ~. ~:9~:9:~:::: 4-~ A-SR RHF'-~'TAT~£ GRADTFNT Q-~ ~ 4-~7-RR BHF'-~TATT£ CR~DTFNT ~-2~ 4-~-RR RHF'-~TATTC ~RADTFNT i?-t t-2?-RR ~HF'-FI.~WTNG RRA~T~NT AF'F'ROVED. _. DT~TRT~I. ITIDN .[:..F klTR Al._F I.I...E,~ f PH TLI...'[ PS C. HEVRON F';: I,IFI..I... FTI D & M ~ F,' & D EXTENZIDN E×F'LORAT TON ~ .~ A F' .P. EXXON ..___ _.._ _~]~$.TA.TECZ.O.F,~AI_A,~"'' .... --R A . MA~'ATH~N ~ TEYAP. N MOBIl.. flTI~ nTT~ nTTR C4MCn RAM~ nAMnn nTT~ DTT~ DTT~ ARCO Alaska, Inc Prudhoe Bay t:.gineering Post Office Box 100360 Anchorage, Alaska 99510-0360 Telephone 907 263 4248 Donald F. Scheve Operations Engineering Manager C. V. "Chat" Chatterton Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Re: DS 9-9 Approval No. 7-491 Dear Mr. Chatterton: Attached is the Report of Sundry Well formed on the above-referenced well. Very truly yours, D. F. Scheve DFS/JMV/jp Attachment cc: Standard Alaska Production Company Pi(DS (9-9)W1-3 Operations detailing work per- 1 WELL S / 114 ARCO Alaska, Inc. is a Subsidiary of AtlanticRichfieldCompany AR3B 61,'~2 C STATE OF ALASKA ALA,.,,~; .)IL AND GAS CONSERVATION COl .... ,.,SION REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown [] Stimulatelgt Plugging [] Perforate [] Pull tubing Alter Casing [] Other [] 2. Name of Operator ARCO AI~.~I~ :, T'nr,. 3. Address ?, O, Bo× 100360~ Anchorage~ AK 99510 4. Location of well at surface 1698' FSL & 0' FEL, Sec. 2, T10N, R15E, UM At top of productive interva~ 1196' FNL & 1485' FEL, Sec. 1, T10N, R15E, UM At effective depth 1126' FNL & 1346' FEL, Sec. l, T10N, Ri5E, UM At total depth 1104' FNL~ 1297' FEL, Sec. 1, Ti0N, Ri5E, UM 11. Present well condition summary Total depth: measured 10800 feet true vertical 9132 feet Plugs (measured) 5. Datum elevation (DF or KB) 54' RKB 6. Unit or Property name Prudhoe Bay Unit 7. Well number 9-9 8. Approval number 7-491 9. APl number 50-- 029- 20,~32 10. Pool Prudhoe Bay Oil Pool Feet Effective depth: measured 10664 feet true vertical feet 9014 Casing Length Size Structural Conductor 80 ' Surface 2699 ' Intermediate Production 10753 9-5 / 8" Liner Perforation depth: measured 10564-10614'; 10627-10632' true vertical 8928-89971'; 8982-8987' Tubing (size, grade and measured depth) 7", 5½", L-80 tubing w/tail @ 10302' Packers and SSSV(tvpe and measured depth) DB Packer @ 10160'; Camco SSSV @ 2192' 20" 13-3/8" Junk (measured) Cemented Measured depth True Vertical depth 300 Sx 107' 107' 6100 + 250 Sx 2726' 2726' 12. Stimulation or cement squeeze summary 1000 Sx 10780' 9115' Intervals treated (measured) NA'/~ Treatment description including volumes d§ed and final pressure 13. Prior to well operation Subsequent to operation Representative Daily Average Production or Injection Data OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure 2450 1531 15 -- 2480 1810 8800 Tubing Pressure 265 32O 14. Attachments Daily Report of Well Operations Copies of Logs and Surveys Run [-.] 15. I hereby certify that the foregoing is true and correct to the best of my knowledge Form 10-404 Rev. 12-1-85 WELLS/il4 TitleOperations Engineering Manager J. M. Vitucci, 265-6358 D at e19,57~" ) Submit in Duplicate~ DRILL SITE 9-9 SELECTIVE STIMULATION ARCO Alaska Inc. performed the following stimulation on Well 9-9 on 9/6/87: 1. Obtained a valid well test. 2. Performed a fill cleanout to 10640' MD. 3. Fluid packed the 7", 5-1/2" x 9-5/8" annulus. 4. MI and RU pump trucks, transports, CTU, and N2 unit. 5. RIH with CTU to 10380' MD. Fluid packed the coil/production tubing annulus. 6. Stimulated the well as follows: A. 1000 gals of xylene B. 2500 gals of 15% HCI w/additives C. 2000 gals of 6% HCL-1.5% HF w/additives D. 2000 gals of 2% NH4CI water E. 500 gals of 2% NH4CI water w/CMHEC blended with 300# of soild OSR 25 gals of liquid OSR Non-ionic surfactant F. 1500 gals of 15% HCI w/additives G 3000 gals of 6% HCL-1.5% HF w/additives H. 3000 gals of 2% NH4CI water I. 1000 gals of diesel w/10% EGMBE J. Displaced stimulation fluids to bottom of coiled tubing with diesel 7. N2 lifted well immediately after stimulation. 8. RD and released equipment. 9. Tested well for new capacity 24 hrs. after job completion. STATE OF ALASKA r.~ AL/-, .... A ,.)IL AND GAS CONSERVATION CO,..,~oSION APPLICATION FOR SUNDRY APPROVALS 1. Type of Request: Abandon [] Suspend [] Operation Shutdown [] Re-enter suspended well E} Alter casing [1 Time extension [] Change approved program [] Plugging [] Stimulate ~ Pull tubing [] Amend order E:] Perforate E] Other 2. Name of Operator ARCO Alaska: Inc. 3. Address P.O. Box 100360, Anchorage, AK 99510 4. Location of well at surface 1698' FSL & 0' FEL, Sec. 2, T10N, R15E, UM 5. Datum elevation (DF or KB) 54' RKB 6. Unit or Property name Prudhoe Bay Unit 7. Well number 9-9 At top of productive interval 1196' FNL & 1485' FEL, Sec. At effective depth 1126' FNL & 1346' FEL, Sec. At total depth 1104' FNL, 1297' FEL, Sec. 1, T10N, R15E, UM 11. Present well condition summary Total depth: measured true vertical 1, T10N, R15E, UM 1, T10N, R15E, UM 10800 feet 9132 feet 9. APl number 10. Pool Prudhoe Bay Oil Pool Plugs (measured) feet Effective depth: measured true vertical Casing Length Structural Conductor 80' Surface 2699 ' Intermediate Production 10753 9-5 / 8" Liner Perforation depth: measured 10564-10614'; 10627-10632' true vertical 8928-89971'; 8982-8987' Tubing (size, grade and measured depth) 7", 5½", L-80 tubing w/tail @ 10302' Packers and SSSV¢tv[:)e and measured depth/ DB Packer @ ~0160'; Camco SSSV@- 2]'92' 10664 feet 9014 feet Size 20" 13-3/8" Junk (measured) Cemented Measured depth True Vertical depth 300 Sx 107' 107' 6100 + 250 Sx 2726' 2726' 1000 Sx 10780' 9115' Nask~ 0it & Gas Cons. 6ommissm~, ~chom~e 12.Attachments Description summary of proposal 1~ Detailed operations program [] BOP sketch E'] 13. Estimated date for commencing operation July 1987 14. If proposal was verbally approved Name of approver Date approved 15. I hereby, certify that the foregoing is true and correct to the best of my knowledge Signed 2e,,¢,/~/~~ Title Operations Engineering Manager Commission Use Only Date Conditions of approval Approved by L Form 10-403 Rev 12-1-85 WET,L$/ii4 Notify commission so representative may witness [] Plug integrity [] BOP Test Commissioner M. M. Magu~re, 263-44Z8 I Approval No. [] Location clearance '~ "' -"'~/ ~ / , ~ .¢' ~,W"~;'~;,i~i;-,~ '~'~ ~'~'~': "'~' by order of the commission Date Submit in triplicate(~ DRILL SITE 9-9 SELECTIVE STIMULATION PROCEDURE AFE #699012 PROPERTY CODE #2120658-09 · me 3o Perform fill cleanout down to 10690' MD. Obtain a valid well test at the current recommended GLG rate. Fluid pack the 7", 5-1/2" x 9-5/8" annulus with crude. 4. MI and RU pump trucks and transports. o 6, 0 0 Stimulate the well as follows: me fo g. h. i. j. k. 2000 gals of 2% NH,C1 water w/additives 2500 gals of 15% H~i w/additives 2000 gals of 6%-1½% HCl-HF w/additives 2000 gals of 2% NHoCi^ water w/additives 500 gals of 2% NH4~i water w/CMHEC blended with oil soluble resins (300#) 1500 gals of 15% HC1 w/additives 3000 gals of 6%-1½% HC1-HF w/additives 3000 gals of 2% NHACl wa~er w/additives 1000 gals of diese% w/10% EGMBE Displace with 200 bbls of crude Displace with 5 bbls of diesel Begin gas lifting immediately after the displacement diesel. RD and release equipment. Test the well at the current recommended GLG rate for new capacity. 5 WELLS/il4 6 5 4 1. 5000 PSi 7" WELLHEAD CONNECTOR FLANGE 2. 5000 PSI 4- 1/16" PIPE RAMS ,3. 5000 PSI 4- 1/6" HYDRAULIC SLIPS 4. 5000 PSI 4 1/6" SHEAR RAMS 5. 5000 PSI 4 1/6" BLIND RAMS 6. 5000 PSI 4 1/16" STUFFING BOX 2 ,,! I R~£EIVED /-~.,i..i~:i,..,~, :~ i987 Alaska Oil & 6as Cons. Commission, Anchorage CO ! LED TUB ! Nt2 UN ! T BOP EQU ! PMENT ARCO Alaska, F'.O. Box i Anchorage, Alaska 995~ (~ DATE: Juoe 4, i987 REFERENCE: ARCO F'res~ure Data 3-28 5-7-87 Static 9-9 5-4-87 Static PLease ~igo and reCurn ~he gradien~ Camco Gradient Cat,~co a¢kached copy as receipt of data, Received By.. HAYE A ['lICE nAY! Rosanne Peek Approved ARCO ALaska, Inc P,,O. Box Anchorage, ALaska 995~ ~) . DATE' May i4, REFERENCE' ARCO 9-6 5-3-8? 9-9 5-4-87 9-28 5-8-87 ~ J-4 5-3-8-7 t 6-7 5-4 -87 t ?-~ 4 5-9-87 ~987 Cased HoLe Final Prod. Profi te/FLowmeCer/GR FLowmefer/Temp/WaCer HoLd-Up Prod~ Profi Le/LeaK DeC. Le~k De~./FLowme~er/Temp~ Gas Life Temp. ~urvey Leml¢ De¢./Temp./FLowme'ter Run 2, 5" Csmco Run t, 5" Camco Run f, 2" & 5" Camco Run t, 5' Camco Run t, 5' Camco Run ~, 5' C~mco F'Lea~e :si go and reCu'rn Received By. HAVE A NICE DAY! t h e a+.i:ached c ~, -~e~'i:. D:~I' a. ..~. /' //' ~a~Y,a u~ & Gas Cons. Oommission (._.....,../ Anchorage TRAN,~ ... o ";'", ~.':, 'i¢(.~ ! -" ,--"-,.-' Approved DIS~TRIB~JTION '"'-.- Cer,+.ra I 1:' i Les ~~ Chevron · ~'~Ex'ten~Jon ExpLora't ion :~: Ex xoi~ Mara'thon ~: Hob i L · .- Phi LLips .... ...;: '. L F'i Le~ R & D .... · .- ...... ~_oh J 0 "":'"' ':"01" Alaska ,.~...., '..:;Z$ k a 't e · _. '"' Texaco '- '1,~ ' ' ARCO ALaska, Inc· I=' ~ O, Box Anchorage, Alaskm DATE:: May ~3, ~987 REFERENCE: ARCO Cased HoLe Final 2-6 it-7-.86 Perf. Record Run t, S-t2 ti-2'!-86 CET Run 2, 5" 6--.t2 5-.S-87 Perf, Record ' Run i, 5" 7-7 S-28-87 Tubing CoLLar Log Run ~, 9-9 ~-'8-86 F'erf. Record Run ~, 5' ~3-98 ~-~4-86 CH CNI. Epi~herma[ Run 26, i3-98 J~-~4-86 CH CNL ThermaL Run 26, 5 ~3-98 ~J-~4-86 CH DIL Run 26, 5 J3-98 ~2-26-86 CH DIL. Run 27, ~3-98 ~2-26-86 CH CNL Thermal Run 27, JS-98 ~2-26-86 C;l.-I CNL EpithermaL Run 27, ~4-3~ 3-29-87 Tubing ColLar Log Run ~, Ngi ~5 J~-23-86 F:'erf, Record Run J, Sc h Sch $ch Otis $ch Sch Sch Sc h Sch Sch Sch O~i~ $ch PLea.se sign and return the attached copy as receip'~ of data. Received ]By _ ~ ......................... E'l- . HAVE A NICE DA-Y! ~ R o s' a n n e F: e e k ~ ~a~n ~ ~ ~ A T 0 -. t 5 29 t..~;aska Oil & ~as Cons, Commla-' - ~ TRANS :::8724S ~ Al:) p i" oved ................................................ DISTRIBUTION · "' Central Fi Les ... · .- F:'hi llips · .-'"' Chevron .'-'"',".., '.~,'.'.,,,.. I. I. F:'i les D & M I:;: & P :~ E x '1' e r,.s' i o n I.Z x p l o r a ~.' i o n ~: S o h i o .11. · .. E"'xxon ~'. Si'ate of Alaska M a r a '!' h o n $ T e x a c (3 · "' H o b i !_ ':~-' STATE OF ALASKA ALASKA u~L AND GAS CONSERVATION CL, MMISSION~ WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1. Status of Well Classification of Service Well OIL [~ GAS [] SUSPENDED [] ABANDONED [] SERVICE [] 2. Name of Operator 7. Permit Number ARCO Alaska, Inc. 76-76 3. Address 8. APl Number P. 0. Box 100360, Anchorage, AK 99510 50- 029-20232 4. Location of well at surface 9. Unit or Lease Name 1698' FSL, 0' FEL, Sec. 2, T10N, R15E, UM Prudhoe Bay Unit At Top Producing Interval 10. Well Number 1126' FNL, 1346' FEL, Sec. 1, T10N, R15E, UM 9-9 -- At Total Depth il. Field and Pool 1104' FNL, 1297' FEL, Sec. 1, T10N, R15E, UM Prudhoe Bay Field 5. Elevation in feet (indicate KB, DF, etc.) I 6. Lease Designation and Serial No. Prudhoe Bay 0i 1 Pool RKB 54'J ADL 28327 12. Date Spudded11/10/76 i 3' Date T'D' Reached11/30/76 14' Date C°mp" Susp' °r Aband' J 15' Water Depth' if °ffsh°re 116' N°' °f C°mp'eti°nsl 2/15/76* N/A feet MS L 1 17. Total Depth (MD+TVD) 18.Plug Back Depth (MD+TVD) 19. Directional Survey ' I 20. w,,r. SSSV set i 21. Thickness of Permafrost 10800'ND 9132'TVD 10692'MD 9038'TVD..- YES]~] NO[]I 2192' feetMDI 1900' (Approx) · 22. Type Electric or Other Logs Run D IL/SP, BHCS/GR, FDC/CNL/CR/Cal, Gyro, CNL/CR/CCL 23. CASING, LINER AND CEMENTING RECORD SETTING DEPTH MD CASING SIZE WT. PER FT. GRADE TOP BOTTOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED 20" Welded H-40 Surf 107' 30" 300 sx AS cmt 13-3/8" 72.0# MN-80 Surf 2726' 17-1/2" 6100 sx AS cmt 9-5/8" 47.0# MN-80 Surf 10780' 12-1/4" 1000 sx Class G~ 300 s~ AS cmt & 250 sx Class G 24. Perforations open to Production (MD+TVD of Top and Bottom and 25. TUBING RECORD interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD) 7"/5-1/2" 1 0302 ' 10160 ' See attached 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. DEPTH INTERVAL (MD) AMOUNT& KIND OF MATERIAL USED N/A 27. PRODUCTION TEST Date First production I Method of Operation (Flowing, gas lift, etc.) August, 1977I F1 owing Date °f Test09/27/77 H °ur~ 'Tl~sted' TEsTPRODUCTION FORpERIOD -~1~ O I ~[~SB2BoL. 6 G q~-~/C.~ WA~ER-BBL CH~O~E $1ZE42 95/64 IGASIOIL RATIO774 Flow Tubing Casing Pressure CALCULATED=~ OIL-BBL GAS-MCF WATER-BBL OILGRAVITY-APi (corr) Press. 1315 0 24-HOUR RATE I~' 9604 7438 0 27.0 28. CORE DATA Brief description of lithology, Porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips. RECEIVED None JAH 2 3 19~7 Alaska 0il & Gas Cons. Commissi0. A~ch0rage *Note: Perforated well 05/16/77. Well worked over 12/09/86. Form 10-407 WC2:06:DANI Submit in duplicate Rev. 7-1-80 CONTINUED ON REVERSE SIDE 29. 30. GEOLOGIC MARKERS FORMATION TESTS , . NAME Include interval tested, pressure data, all fluids recovered and gravity, MEAS. DEPTH TRUE VERT. DEPTH GOR, and time of each phase. Top Sadl erochit 10378' 8762' N/A Top lB 10540~ 8902' Top lA 10590' 8946' Base Sadlerochit 10650' 8981 ' :, 31. LIST OF ATTACHMENTS None 32. I hereby certify that the foregoing is true and correct to the best of my knowledge -- INSTRUCTIONS General' This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Item 1' Classification of Service Wells' Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate, form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). Item 23: Attached supplemental records for this well should show the details of any multiple stage cement- ing and the location of the cementing tool. Item 27' Method of Operation' Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In- jection, Gas Injection, Shut-in, Other-explain. Item 28: If no cores taken, indicate "none". Form 10-407 WELL COMPLETION OR RECOMPLETION REPORT AND LOG Item 24 Perforation Depths: MD 10564' - 10614' 10629' - 10634' DRILL SITE 9-9 cont. TVD 8928' - 8971' 8984' - 8989' 10385 - 10395 10409 - 10434 10473 - 10476 10483 - 10489 10517 - 10521 10528 - 10552 Perforated w/4 spf Squeezed Perforations 8772 - 8781 8793 - 8815 8849 - 8851 8857 - 8862 8887 - 8890 8896 - 8917 WC2/06 STATE OF ALASKA ALASK.. ,JIL AND GAS CONSERVATION COMMIoolON REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown [] Stimulate [] Plugging [] Perforate [] Pull tubing Alter Casing [] Other ,~ WORKOVER 2. Name of Operator ARCO Alaska· Inc. 3. Add~.s0% Box 100360 Anchorage· AK 99510-0360 4. Location of welt at surface 1698' FSL, 0' FEL· Sec. 2· T10N~ R15E· UN At top of productive interval 1196' FNL· 14.85' FEL~ Sec. 1, T10N· E15E~ UN At effective depth 1126' FNL, 1346' FEL~ Sec. 1~ T10N, R15E· UN At total depth 1104' FNL· 1297· FEL~ Sec. 1, T10N~ R15E¢ UN 11. Present well condition summary Total depth: measured 10800'ND feet true vertical 9132'TVD feet 10692 'MD Effective depth: measured 9038 'TVD feet true vertical feet Plugs (measured) Junk (measured) 5. Datum elevation (DF or KB) RKB 54 ' 6. Unit or Property name Prudhoe Bay Unit 7. Well number 9-9 8. Approval number 576 9. APl number 50-- 029-20332 10. Pool Prudhoe Bay Oil Pool None None Feet Casing Length Size Conductor 80' 20" Surface 2699' 13-3/8" Production 10753' 9-5/8" Cemented Measured depth 300 sx Arctic set 6100 sx Arctic set & 250 sx Class 'C 1000 sx Class G 107'MD 2726'MD 10780'MD True Vertical depth 107 ' TVD 2726'TVD 9115'IVD Perforation depth: measured true vertical See Attached See Attached Tubing (size, grade and measured depth) 7"/5-1/2", L-80~ tbg w/tail ~ 10302' Pa~j~er~ anldlS0~0V, (type and measured depth) uo pKr L~ , ~,amco SSSV ~ 2192' 12. Stimulation or cement squeeze summary N/A Intervals treated (measured) Treatment description including volumes used and final pressure RECEIVED Alaska Oil & Gas Cons. Commission 13. N/A Prior to well operation Subsequent to operation 14. Attachments Representative Daily Average Production or Injection Data OiI-Bbl Gas-Mci Water-Bbl Casing Pressure Tubing Pressure (Workover Well History w/Addendum, dated 12/15/86) Daily Report of Well Operations I~ Copies of Logs and Surveys Run L3 15. I hereby certify that the foregoing is true and correct to the best of my knowledge ~ /'/~ /7- '~-~'" Signed Form 10-404 Rev. 12-1-85 Title Associate Engineer Date (DAM) SW0/148 Submit in Duplicate REPORT OF SUNDRY OPERATIONS DRILL SITE 9-9 cont. Item 11 Perforation Depths: ND 10564' - 10614' 10629' - 10634' 8928' 8984' TVD - 8971 ' - 8989 ' 10385 10409 10473 10483 10517 10528 10395' 10434' 10476' 10489' 10521' 10552' Squeezed Perforations 8772 8793 8849 8857 8887 8896 - 8781' - 8815' - 8851' - 8862' - 8890' - 8917' SWO/151:dmb Distrtot Alaska Field Prudhoe Bay Auth. or W.O. no. Alq[~ AS0910 Well History- Initial Rep°ri~- after a well is spudded or workover operations are started. form giving inclusive dates only. parish or borough North Slope Borough State Alaska ILea. orUnit ADL 28327 Title Recompletion IWell no. DS 9-9 W/O AP1 50-029-20332 Operator ARCO-Alaska, Inc. Spudded or W.O. begun Workover 12/2/86 [.our Date and depth as of 8:00 a.m. t2/03/86 12/04/86 12/05/86 12/06/86 thru 12/08/86 Complete record for each day reported IARCO w.I. Prior status 21.66% if a W.O. 1830 hrs. 9-5/8" @ 10,780' Wt. 9.0 PPS NaC1 Accept ri~ @ 1830 hfs, 12/2/86. ND tree, NU BOPE. 9-5/8" @ 10,780' 10,668' PBTD, LD 5½" tbg Wt. 9.0 ppg NaC1 Pull hgr, pull & LD 5½" tbg. 9-5/8" @ 10,780' 10,668' PBTD, RIH w/RBP pkr 8.7 ppg NaC1 Fluid loss high, cut brine wt to 8.7 ppg & fin TOH, LD 5½" tbs. shed, RIH w/RBP pkr, PU 3½" DP. Load pipe 9-5/8" @ 10,780' 10,668' PBTD, TIH w/5½" CA 8.7 ppg NsC1 TIH w/RBP pkr, set @ 9510'. ND BOPE, chg out tbg spool, NU BOPE, Cst tbg spool to 5000 psi. Tst csg to 2300 psi. Unseat RBP pkr & TOH. RIH w/FTA, pull PBR & K-Anchor. Chg rams to 5½" & prep to rn 5½" CA. The above is correct For form preparation and distribution, see Procedures Manual, Section 10, Drilling, Pages 86 and 87. JDate 1/09/87 [Title Drilling Supervisor * ARCO Olland Gas Company Daily Well History-Final Report Instructions: Prepare and submit the "Final Report" on the first Wednesday after allowable has been assigned or well is Plugged, Abandoned, or Sold. "Final Report~' should be submitted also when operations are suspended for an indefinite or appreciable length of time. On workovers when an official test is not required upon completion, report completion and representative test data in blocks provided. The "Final Report" form may be used for reporting the entire operation if space is available. District~.aska County or Parish Field Lease or Unit Prudhoe Bay Auth. or W.O. no. T t e AFE AS0910 wws #1 Operator I A.R.Co. W.I. ARCO Alaska, Inc. Ii 21.66% Spudded or W.O. begun Date Workover 12/2/86 Date and depth as of 8:00 a.m. Old TD Released rig 12/09/86 12/10/86 Complete record for each day reported North Slope Borough ADL 28327 Recompletion IAccounting cost center code State A~aska AP1 50-029-20332 I otal number of wells (active or inactive) on this est center prior to plugging and bandonment of this well I our I Prlor status if a W,O, 1830 hrs. lWell no. DS 9-9 W/O 9-5/8" @ 10,780' 10,668' PBTD, Tst tree Diesel Rn & land 5-1/2" x 7" prod string w/SSSV @ 2192' & top of pkr @ 10,160'. Land tbg. ND BOPE, NU & tst tree to 5000 psi. 9-5/8" @ 10,780' 10,688' PBTD, RR Diesel Fin Cst tree. Dtspl well w/diesel. New TD 1200 Hrs.Date 12/09/86 Classifications (oil, gas, etc.) Oil RR @ 1200 hrs, 12/9/86. Producing method PB Depth JK nd of rig Type completion (single, dual, etc.) Single Official reservoir name(s) Sadlerochit 10,688' Rotary Potential test data Well no. Date Reservoir Producing Interval Oil or gas Test time Production Oil on test Gas per day Pump size, SPM X length Choke size T.P. C.P. Water % GOR Gravity Allowable Effective date corrected The above is correct Signatur For form preparation and distribution, see Procedures Manual, Section 10, Drilling, Pages 86 and 87. IDate [Title 1/09/87 Drilling Supervisor ADDENDUM WELL: 11/30/86 9-9 Kill and secure well prior to moving r~g. Rn Otis PXN plug to XN nipple @ 10,107', POH, press tst tbg to 2000 psi. RIH w/5-1/2" XA SSlv shifting tl, made 2 art's to shift slv w/o success, POH, RD Otis. RU Gearhart, RIH w/3-1/8" jet gun, perf w/8 shots @ 10,090'-10,088', POH, RD. Pmp 9.0# NaC1 dn tbg until cln rtns. Pmp 10 bbls diesel dn tbg & equalized w/ann across surf f/freeze protection. Secure well. Drilling Supervisor ' bat~ '" · STATE OF ALASKA ALASKA .~,L AND GAS CONSERVATION COMMIc,..,,ON APPLICATION FOR SUNDRY APPROVALS 1. Type of Request: Abandon ~ Suspend ~ Operation Shutdown ~ Re-enter suspended well ~ Alter casing -- Time extension ~ Change approved program ~ Plugging ~ Stimulate ~ Pull tubing ~ Amend order- Perforate- Other- 2. Name of Operator ARCO Alaska, Inc. 3. Address P. 0. Box 100360 Anchorage, AK 9951 0-0360 4. Location of well at surface 1698' FSL, 0' FEL, ,Sec. At top of productive interval 1389' FNL, 1485' FEL, Sec. At effective depth 1167' FNL, 1358' FEL, Sec. At total depth 1139' FNL, 1297' FEL, Sec. 2, TION, R15E, UM 1, TION, R15E, UM 1, TION, R15E, UM 1 , TION, R15E, UM 5. Datum elevation (DF or KB) 54'RKB 6. Unit or Property name Prudhoe Bay Unit 7. Well number 9-9 8. Permit number 76-76 9. APl number 50-- 029-20332 10. Pool P'rudhoe Bay 0il Pool feet 11. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical 1 0800 ' MD feet Plugs (measured) N o ne 9132 ' TVD feet 1 0664 'MD feet Junk (measured) None 9014 ' TVD feet Casing Length Size Cemented Measured depth ~ue Verticaldepth (RKB) (RKB) Conductor 80' 20" 300 sx Arctic set 107'MD 107'TVD Surface 2699' 13-3/8" 6100 sx Arcticset 2726'MD 2726'TVD Production 10753' 9-5/8" 1000 sx Class G cmt 10780'MD 9115'TVD Perforation depth: measured See Attached N©V ! 7 1986 true vertical See Attached Alaska 0il & Gas Cons. Tubing (size. grade and measured depth) 5-1/2", 17#, L-80, tubing to 10160' 4-1/2", 12.6#, N-80 tailpipe from 10173' to 10302' Packers and SSSV(type and measured dept~keris Sssvg-5/8"at SAa2198,packer at 10160' 12.Attachments Description summary of proposal~ Detailed operations program -~Z BOP sketch 13. Estimated date for commencing operation November 24, 1986 14. If proposal was verbally approved Name of approver Date approved 15. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed (~~ .,--,~¢.Jb- Title Associate Engineer Commission Use Only Date //-17.",¢b, (GDH) SA/176 Conditions of approval Notify commission so representative may witness ~ Plug integrity ~_ BOP Test ~- Location clearance Approved by Commissioner Approval NO. ~,,~,.~ ~7 ~ by order of the commission Date Form 10-403 Rev 12-1-85 Submit in triplicate DS 9-9 WORKOVER PROCEDURE SUMMARY Prior to Ri~_~E: 1. RU wireline and set plug in Otis nipple at 10,236'. 2. Clear location and prepare for rig. 3. Set BPV. With Ri~: 1. MIRU workover rig. 2. ND tree and NU BOPE. Test BOPE to 5000 psi. Pull BPV. 3. RU wireline unit and perforate tubing at 10,090'. POH. 4. Circulate down tubing and take returns on the annulus. Circulate all CaC1 from wellbore with seawater. Pressure test casing to 2000 psi. 5. Shear out of PBR if not already sheared. POH and laydown tubing. Note for any corrosion. 6. RIH with new seals, IPC 5-1/2", 17.0#, L-80 tubing and GLMs. Crossover to 7" at 3500'. Displace tubing and annulus with diesel. Stab into PBR. 7. Land tubing and test tubing and annulus. Set BPV. ND BOPE. NU tree. Test. 8. Release rig. Pull BPV. Perform long term tubing test. 9. RU wi rel i ne. Pul 1 Otis plug. NOTE: Bottom hole pressure = 3950 psi ~ 8800'SS Workover fluid will be seawater or NaC1 brine weighted to keep the well overbalanced. Should the packer be milled, NaC1 or Litesal kill pills will be used as necessary. SA/176a:dmr 11-17-86 OhsABOhOf~geO°~' bul~f~sSiOl~ APPLICATION FOR SUNDRY APPROVALS DRILL SITE 9-9 Item 11 Perforation Depths: MD 10564' - 10614' 10627' - 10632' TVD 8928' - 8971 ' 8982' - 8987' 10385 - 10395 10409 - 10434 10473 - 10476 10483 - 10489 10517 - 10521 10528 ~ 10552 Squeezed Perforations 8772 - 8781 8793 - 8815 8849 - 8851 8857 - 8862 8887 - 8890 8896 - 8917 SA/176(p.2) 11-17-86 ANNULAR PREVENTER § BLIND RAMS 5 PIPE RAHS 4 I'UBIN6 HEAl) 2 1. 13-3/8" CASING HEAD 2. 9-5/8" CASING HEAD 3. 5000 PSI TUBING HEAD 4, 15-5/8" - 5000 PSi PIPE RAMS 5. 15-5/8" - 5000 PSI BLIND RAMS 6. 13-5/8" - 5000 PSI ANNULAR ACCUMULATOR CAPACITY TEST 1. CHECK AND FILL ACCUMULATOR RESERVOIR TO PROPER LEVEL WITH HYDRAULIC FLUID. 2. ASSURE THAT ACCUMULATOR PRESSURE IS 5000 PSI WITH 1500 PSI DOWNSTREAM OF THE REGULATOR. 3. 06SERVE TIME, THEN CLOSE ALL UNITS SIMULTANEOUSLY AND RECORD THE TIME AND PRESSURE REMAINING AFTER ALL UNITS ARE CLOSED WITH CHARGING PUFIP OFF. 4. RECORD ON THE IADC REPORT, THE ACCEPTABLE LOWER LIMIT tS 45 SECONDS CLOSING TIME AND 1200 PSI REMAINING PRESSURE. BOP STACK TEST 1. FILL BOP STACK AND MANIFOLD WITH ARCTIC I~JJ~J. OiI& G,~',!: C~rs~; b:;~,,~'::ssic,q 2 CHECK THAT ALL HOLD-DOWN SCREWS ARE FULLY RETRA~T.E~.!'~ge' PREDETERMINE DEPTH THAT TEST PLUG WILL SEAT AND SEAT IN WELLHEAD. RUN IN LOCK-DOWN SCR~ IN HEAD. 3. CLOSE ANNULAR PREVENTER AND CHOKES AND BYPASS VALVES ON THE MANIFOLD. 4. TEST ALL COI~PONENTS TO 250 PSt AND HOLD FOR 10 MINUTES. 5. INCREASE PRESSURE TO 1800 PSI AND HOLD FOR 10 MINUTES. BLEED TO ZERO PSI. 6, OPEN ANNULAR PREVENTER AND CLOSE TOP SET OF PIPE RAMS. 7. INCREASE PRESSURE TO :~000 PSI AND HOLD FOR I0 MINUTES. 8. CLOSE VALVES DIRECTLY UPSTREAM OF CHOKES. BLEED D~STREAM PRESSURE TO ZERO PSI TO TEST VALVES. TEST REMAINING UNTESTED MANIFOLD VALVES, IF ANY, WITH 3000 PSi UPSTREAM OF VALVE AND WITH ZERO PSI DOWNSTREAM. BLEED SYSTEM TO ZERO PSI. 9. OPEN PiPE RAMS. BACKOFF RUNNING JT AND PULL OUT OF HOLE. CLOSE BLIND RAMS AND TEST TO $000 PSI FOR 10 MINUTES. BLEED TO ZERO PSI, 10. OPEN BLIND RAMS AND RECOVER TEST PLUG. MAKE SURE MANIFOLD AN[ LINES ARE FULL OF ARCTIC DIESEL AND ALL VALVES ARE SET IN THE DRILLING POSITION. I 1, TEST STANDPIPE VALVES TO 3000 PSI. 12, TEST KELLY COCKS AND INSIDE BOP TO 3000 PSI WITH KOOMEY PUI'IP 13. RECC~D TEST INFC~MATION ON BLOWOUT PREVENTER TEST FORM, SIGN AND SEND TO DRILLING SUPERVISOR. 14. PERFORM COMPLETE BOPE TEST ONCE A WEEK AND FUNCTIONALLY OPERATE BOPE DAILY. JG dUNE 16, 1986 ARCO A£a_¢.ka, inc. F'.O. Box 100S60 Anchorage, Alaska 99510 DATE: Augu~.t REFERENCE · ~ 4-4. ~4-32 ~-4 J, J986 ARCO Cased HoLe Final , _... .... F'roductio'n F'rofi I.e R,,n 1 ~' 7-9/t¢,-86 Z..pinner log Run ~. ~ .... F'ump in Temp ~?urvey F'.un I=,= ' 7-23-86 F'umpin Temp ~urvey Run ~_~_oA, , .~ Injec*ion, . Profi[e Log Run 7-13-86 ~pinner 57urvey Run t 5' ¢-~4-8o . Gamma Ray Run Please sign and return the attached copy as receipt of data. Received By HAVE A NICE DAY! L i ',-,da Hu ,'ce ATO-t ~.~.o TRAN$ ~°" 478 DIZTRiBUTION Cent. raj Fi [e~ Chevron D * E'¢+ension... E×p~o;-a±ion. . Ex xon Ha;-a thon Mob i t F'hi ;.lips F'B WeLL Fi [es ~ £oh i o -,-' T¢xa,-o_ ~asKa Oil & 6as Cons. 60mmJ~i0n ~ A~ch0~ge ARCO Alaska, Inc. Prudhoe Bay ~,,gineedng Post Office Bo~: 100360 Anchorage, Alaska §9510=0360 Te~ephor~e 907 263 4248 Operations Engineering Manager Mr. C. V. "Chat" Chatterton Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501 RE: DS 9-9 Permit No: 76-76 Dear Mr. Chatterton: Enclosed is the "Intention" Sundry Notice the above mentioned well. Very truly yours, D. F. Scheve DFS/DAR/plt cc: Standard Alaska Production Co. File Pi(DS 9-9)W1-3 detailing work proposed on RECEIVED APR 0 4 1986 Alaska 0il & (.~aS Co~qs, Commissior~ DAR/16 ARCO Alaska, inc. is a Subsidiary of AtlanticRichfietdCor~pany _. STATE OF ALASKA ALASKA AND GAS CONSERVATION C'r MISSION SUNDRY Fi TICES AND REPORTI. ON WELLS 1. DRILLING WELL [] COMPLETED WELL OTHER [] 2. Name of Operator ARCO Alaska, Inc. 3. Address P.O. Box 100360 Anchorage, AK 99510-0360 4. Location of Well 1698' N of SE Cr. Sec. 2, TION, R15E, UM (Surf) sec. 1, T10N, R15E, UM (Bottom) 5. Elevation in feet (indicate KB, DF, etc.) 1 6. Lease Designation and Serial No. RKB 54' I ADL 28327 7. Permit No. 76-76 t2. 8. APl Number 5o- 029-20232 9. Unit or Lease Name 10. Well Number n_g. c~_g (31-?-1n-15) 1 1. Field and Pool Prudhoe Bay Field Prudhoe Oil Pool Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF: (Submit in Triplicate) (Submit in Duplicate) Perforate [] Alter Casing [] Perforations [] Altering Casing [] Stimulate [] Abandon !-] Stimulation [] Abandonment [] Repair Well [] Change Plans [] Repairs Made [] Other [] Pull Tubing [] Other ~ Pulling Tubing [] (Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.) 13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any proposed work, for Abandonment see 20 AAC 25.105-170). ARCO Alaska, Inc. intends to squeeze existing perforations on DS 9-9 using a tubing unit (CTU). After the squeeze the well will be cleaned and reperforated. operations will be performed in the following manner: coiled These , Cleanout well and load with formation water and diesel. Pump cement and squeeze the following perforated intervals: 10385'-10395'MD 10483'-10489'MD 10564'-10614'MD 10409'-10434'MD 10517'-10521'MD 10627'-].0632'MD 10473'-10476'MD 10528'-10552'MD BI Contaminate the cement. Wait 12 hrs. and reverse out the contaminated cement from the wellbore. Reperforate the following intervals: 10564'-10614'MD 10627'-10632'MD RECEIVED (continued) APR 0 4 1986 Alaska 0il & Gas Cons. Uuitl~it~o~,.~n 14. I hereb¥"eertify thatsbe foregoing is true and correct to the best of my knowledge. Signed ,'. . Title The space below for Commission use Operations Engineering Manager Date Conditions of Approval, if any: Approved by By Order of COMMISSIONER the Commission Date Form 10-403 Rev. 7-1-80 10/D. A. Rich ATO 1444 - 263-4351 Submit "Intentions" ~n Triplicate and "Subsequent Reports" in Duplicate ALASKA c~u_ AND GAS CONSERVATION C~4MISSION SUNDRY [ .ITICES AND REPORT,_ ON WELLS 1,3. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, ~ncluding estimated date of starting any proposed work, for Abandonment see 20 AAC 25.105-170). o e FI Stimulate well as follows: 1500 gal of 15% HC1 w/additives atomized w/Nh 3000 gal of 6% HCi-i~% HF w/additives atomizJd w/N 2 1000 gal of NHAC1 water atomized w/N2 750 gal of gelled NHAC1 water w/750# of BAF's 850 gal of 15% HC1 w/additives atomized w/N~ 1700 gal of 6% HC w/l~% HF w/additives atomized w/N2 850 gal of NH4CL water atomized w/N? Displace formation w/dead crude atomized w/N2 Reperforate the following intervals and test well: 10385'-10395'MD 10483'-10489'MD 10409'-10434'MD 10517'-t0521'MD 10473'-10476'MD 10528'-10552'MD Ref: BHCS 11/30/76 ECEIVED APR 0 4 1986 14. I hereb)rcertify that tb~e fore ding :i.~ true and correct to the best of my knowledge. Signed -- _ _ The space below for Commission use Date Conditions of Approval, if any: :,, ;~'* ~,:~ BY Order of Approved by COMMISSIONER the Commission Date / Form 10-403 Rev. 7-1-80 10/D. A. Rich ATO 1444 - 263-4351 Submit "Intentions" in Triplicate and "Subsequent Reports" in Duplicate ARCO ALaska, Inc~ F'~O. Box t OOS&O Anchorage, A Lm$1<m 99510 DATE' December 28, t985 REFERENCE: ARCO C@~ed HoLe Fina DS 9-9 t2-7-.85 F'roduc'l:ion F'rofi Le Run 2 5' Ca~,tco PLease sign and refurn fhe a'l"tached copy as receip't of da'['a~ Received By HAVE A NICE DAY! KeLLy McFa'rLand ATO-J 429F TRANY ~95 D I ~"1" R I BUT I ON Chevron I) & M Exp[ora¢ion Service~ Exte~ion Ex;:Lora~ion Ex xon MaraChon Mob i [ Phi L L ip~: F'B WeLL.Fi Le~' R & D $'oh Jo $~-,m te :o f A l:a~ k a Texaco ARr":n ' ' ....... .,'.~ ~.a:i...-ka, Inc. P..O. Bc, x t~-~056~ A 'r'~ c h ,:::, y' :a g e, A L a s~ k a 995t i:;.' U. Y". £;' >! ,:: :! .i.,..:Ti. Chevron D ,-S H E:'xp lora t i o'n .".~e':"v i ces- Ex x on Ge±fy Nob i L ;'"; "'" :'" i. ::: .!!..: !" !.. Phi LLip~ $ohio ~ta'fe of' ~[.as'ka ARCO Oil and Gas C,,..c~pany ,- ~! O~!i,:-.c. : ,, March 28, 1980 Reference' D.S. 3-13 ~/~ease sign of data. ARCO ~k~gnetic Tapes 3/14/80 CN 8800-11820 1/20/80 Tape #60217 1/26/80 Tape #60250 12/25/79 Tape #60131 and return the attached copy as receipt K. J. Sahlstrom North Engineering TRANSMITTAL # 242 DISTRIBL~IO5 North Geology' R & D ~h'illing Eng. Manager Geology State of Alaska Exxon Mobil Getty Phillips Sohio ~.[arathon Chex,Ton ARCO Oil and Gas Company ~--..~. -" 2.: 7! C: 2 .- .... · ': ': ' '" ' .9 ,':~ ":' ]'. ?v' ';-:77 March 26, 1980 Reference' ARCO Cased Hole Logs "COAA~,' COMM COMM RES ENG ~---2 ENG .... 3-ENG 4 ENG 1 GEOL ...... __. STAT TEE: ,STAT TEC FILF: D.S. 5-7 6/18/78 Continuous Flow Smafey Run ] 5" 6/12/78 " " " ]'<un 1. S" 10/28/78 " " " Run I 5" D.S. 9-17 9/25/78 " " " Ibm 1 5" ~,.~p~S. 9-19 8/5/78 " . " " Run 1 S'; ease sign and return the attached copy as receipt of data. K. J. Sahlstrom North Engineering TRANSMITTAL # 229 DISTRIB[?FION North Geolooo~/ R & D Drilling Eng. ~hanager Ceology S~ate of Alaska F~xx OD blobil Getty Phillips Sohio Marathon ~e~won February 2~, 198(/ Re£erence · Enclosed are Cased I Io]e ]Jogs for tile fol].o~,,':in~,, AR(;O wells' I).S, 5)-5 2/4/80 D.S. 9-6 1/28/80 " Run 1 5" --~'7~7'~Ti'~0' i/27/80 CNL ~q~lease sign and return the attached cop)' as receipt of data. K. J. Sa]~lstrom North Engineering DISTRIBUTIO.~ North Ceoloov R&D Dcilling Eng. ~Ianager D & ~I ~O0] OCrV State of Alaska t'Lxxon },Iobil get. ty t)t~tllips Sohi. o ~.Iarathon (J~evron ., · ,. North Alaska Oistridt Post Office F~"--'"'0 ' Anchorage ..... a 99510 Telephone 907 277 5837 b~rch 16, 1979 Reference' Enclosed are the following cased hole logs.. DS 4-2 ~ Diff. Temp. DS 4-12 ~× CCL DS 9- 20 - Spinner DS 9~13--~ Cont. Flow - DS 14-3' ~" CNL . . _ Diff. Temp. DS 9-16-~/ Cont. Flow DS 9-19'~ Cont. Flow DS 3-7~-' Cont. Flow 9/2s178 12/01/78 121 /78 61 .;178 11/28/78 11/20/78 9118178 6/ 2/'78 10/24/78 8/29/78 Please sign and return the copy as receipt of data. Sincerely, V.G. Reimers North Engineering TR~d',ISMI TTAL #99 DISTRIBUTION North Geology ' Drilling, Fng. Manager. R & D " Geology .. "¥~State of':Alaska} ~D:&,M~ ......~. . . ',.,~, · ..:sE-arr: ~ohio Mobil Marathon Phillips Chevron Getty January 22, 1979 Reference' Enclosed are the following Cased hole logs' DS 7-4 Noise Log 1.0/1./78 DS 9-1Z .Fluid Density 9/25/7~{ DS 7-6 CNL 11/20/78 DS 6-1 Diff. Temp. log 11/20/78 DS 7-6 CCL 11/23/78 Please sign and return the copy as receipt of data.f.'"?¢',~v~ Sincerely, / V.G. Reimers North Engineering .TRANSMITTAL [~03 2 DIS ikI bU J_ liON North Geology Drilling Eng. Manager R& D GeologY State of Alaska D &M January 22, 1979 Reference: Enclsoed are the foil. owing cased hole DS 5-14 Cont. Flow 6/14/78 DS 9-17 ConL. Flow 6/28/78 DS 6-8 Borehole Audio 10/31/78 DS 6-7 CNL 8/25/78 DS~~__~3-7~_ Spinner 10/19/78 (~DS 9-9~? Fluid Density 10/29/78 DS 6-2 CCL w/dummy gun 10/29/78 DS 1-4 O~/~ 11/tl/78 DS 6-4 CCL 11/13/78 DS 4-5 CNL 11/14/78 NGI #2 CCL w/Dummy gun 10/27/78 DS 4-6 CNL 11/12/78 DS 2-1 CNL 11/11/78 NGI #2 CCL w/ Dummy gun 11/23/78 DS 5-12 Cont. Flow 6/10/78 DS 5-2 CNL 11/09/78 Please sign and return the copy as receipt of daLa(, Sincerely, ' / V.G. Reimers North Engineering TP~A~NSHITTAL #033 DISTRIBUTION North Geology Drilling Eng. Manager R& D Geology State of Alaska D E%xon Sohio Mob i 1 Marathon Phi].l~ ps Getty North A!ask~ ?:-~.ict Pos~: Office ~ ,;.. A,nchoraae, Te!ephone 90?' 277 5557 November 16, 1978 Reference: Enclosed are the following logs: S ' ii,/ Fluid Density 9/20/78 '~[~.-#4-2 Diff. Temp. 10/5/78 D..S. #7-5 CNL 10/10/78 D.S. #4-2 ' Flow Meter 10/5/78 .D.S. #7-2 CBL/VDL/GR' 10/2/78 D.S. #4-2 Fluid Density 10/5/78 D.S. #5-1 Neutron 10/12/78 D.S. #7-5 CBL/VDL/GR 10/9/78 D.S. #9-19 Fluid Density 10/24/78 D.S. #5-1 Flow Meter 10/12/78 D.S. #7-4 CBL/VDL/GR 9/15/78 D.S. #9-17 D.S. #7-4 Dual Spaced Neutron 10/26/78 Noise Log 9/30/78 Neutron 10/28/78 please sign and return the copy as receipt of data. Sincerely, V.G. Reimers North Engineering TRANSMITTAL #566 AtlanticRi~c~hfieldCo mpany North American Producing Division North Alask ..... *rict Post Office ,... ,50 Anchorage, Alaska 99510 Telephone 907 277 5637 August 14, 1978 Mr. Hoyle H. Hamilton State of Alaska Department of Natural Resources Division of Oil and Gas 3001 Porcupine Drive Anchorage, Alaska 99501 Subject: DS 9-1 DS 9-2 DS 9-3 DS 9-4 DS 9-5 DS 9-6 Permit No. 75-76 Permit No. 76-16 Permit No. 76-35 Permit No. 76-40 Permit No. 76-47 Permit No. 76-48 DS 9-7 Permit No. 76-58 DS - Permit No. 76-70 Permit No. 76-76 Permit No. 76-82 Dear Sir: Enclosed please find a Completion Report for the above- mentioned wells. Very truly yours, Frank M. Brown District Drilling Engineer FMB: lr Attachments SUBMIT IN DU~'Ju~CATE* STATE OF ALASKA ', Se,, ,:,th,,r m- st ructlon~ on rever~t' shie ~ OIL AND GAS CONSERVATION COMMITTEE i i i ii II i i WELL COMPLETION OR RECOMPLETION REPORT AND LOG* W ELL ~r ELL DB Y Other b. TYPE OF COMPLE~ON: W~:LL ov~ Ex BACK gESVR. Other Perforated 2. NAME OF OPERATOR Atlantic Richfield Company 3. ADDRESS OF OPERATOR P.O. Box 360 Anchorage~ Alaska 99510 4. LOC^r~ON or wELL' (Report location cgearly and in accordance with any State requirements)* At surface 1698'N of SE cr Sec 2, T10N, R15E, UM At top prod. interval reported below At total dept~232'8 & 1485'W of NE cr Sec 1, TiON, R15E, UM 5. AP1 NUg/I]RRiCAL CODE 50-029-20232 6. LEASE DESIGNATION AND SERIAL NO. APL 28327 7. 1F iND1A3q, ALLOTTEE OR TRIBE NANIE 8. UNIT,FA/llVi OR LEASE NAME Prudhoe Bay Unit 9. WELL NO. Dsg-9 (31-2-10-15) ~0. rIE~ A~O POOL, OR w~dhoe _P~r_udhoe Bay .F:$eld-Oil Pool 11. SEC., T., R., M., (BOTTOM HOLE OLLJ EC~I'IV E ) Sec. 1, TiON,. R15E~ UM 12. P~tlVIIT NO, 1139'S & 1297'W of NE cr Sec l, TiON, R15E, UM 76-7.6 11-10-76 | 11-30-76 12-15-76 5-16-77) 21' Pad Elev. (Gravel)J I~, TOTAL DEPTH, MD & TVD ~9. PLUG, BACK MD & T~Dp, IF 1VfULTIPLE CO1ViPL.. 21. HOW 1VIA_N[Y* ROTARY TOOLS 10,800'l~D_ 9128'TVD ! 10~,.692'MI) 9116'TV!~ Ail Single PRODUCING INTERVAL(S), OF THIS CoMPLETION--TO!P, BOTTOM, NAME (MD AND ~5;I))- Top Sadlerochit 10,378® 8762'TVD Base SAdlerochit 10,630'MD 8981'TVD 20" [Welded ]3-3/g" ~72#-Butt 9-5/8" 147#-Butt LINER ~C Ot~D 24. TYPE ELECTRIC AND OTHIKi~ LOGS RUN DIL/SP. BHCS/.GR, FDC~C. NL/GR/Cal~ GR/CNL/CCL, F. DL 25. CASING RECORD (Report all strings set in well) CASU<G SIZE ["GRADE ,.1 DEPTH SET 26. 30, 10,385'-10,395' 10,409'-10,434' 10,473'-10,476' 10,483'-10,489' 10,517'-10,521' - 10,528'-10,552' 10,564' -10,614 ' 10,627'-10,632' W[~ ~h0ts.per. ft. P~ODUCT!ON INTERVALS DRILl,ED BY I ('AB ,E TOOI,M 23. %VAS DIRECTIONAL , S UI{rVEY MADE I Yes 1 HOLE SIZE t CEMLNTING RECOILD 30" 300 sx Arcticset cmt 17-1/2"[. 5950 sx Arcticset cmt. 12-1/4"$ 1000 sx .Class G cmt I 27. TUBING RECOIkl) SCiLEEN (~fD) [ SIZE ~' DEPTH SE/' (MD) ~ PACKER SET (MD) i £t?. 'IOUNT PULLED .... ,z : ":' ,' N/A ; b':,. Ph':,. '' DATE FiRS]2 PliODUCTION ! PP~ODUCT1ON ME I [{OD (Fiowh~g, gas lif i, pumping--size and type of pump, [ V~ ?:LI:, ~:YI:A'fUS {Producing or August 1977 '~':~ [ Flowing [ .......... 'Producing ::27-77 , ! 3.8 [ 42095/64 I:s2°'6 I 1177.7 I 0 [ 774 FLO~V, ~T~BING [CASING P~ESSU~ [CALC~T~ OI~BB~. GAS--MC~. W~BBL ~OIL GRAVITY-~I (CO~.) ~s I 0 I ~ [ 9604 I 743s I 0 I 27.0 . 31. DISPOSITION O~,S (8old, u,edJorJuel, vented, etc.) [TEST W~T~'~SS~V n~ t Raini e.c t e.d 32. LEST OF ATTACHMENTS 33. I h~ . 1 _reby certify that the fs~regotng an~ attached information is comp ete and correct as determined from all-available recurd.~ SlONE -~~:~~~TITLE Pist Prig ~. _ DATE ii *(See Instructions and Spaces [or Additional Data on Reverse Side) INSTRUCTIONS General: This form is designed for submitting o complete ond correct well completion report end log on all types of lanJs ~nd leases in Alaska. Item: 16: Indicate which elevation is used as reference (where not otherwise shown) for depth measure- ments given in cther sp~ces on this form a'nd in any ott~chments. Items~20, and :22:: If this well is completed for sep0ratc, production from more th~n one ~nterval zone (multiple completion), so state in item 20, ~nd in item 22 show the prc. Jucing interval, or intervals, top(s), bottom(s) ~nd name (s) (if any) for only the intervol reported in item 30..Submit a separate report (p~ge) on this form, ~dequately identified, for e~ch additional interval to be seperately produced, show- ing the ~cfditional data pertinent to such interval. Item'S6: "-S~cks Cement": Attached supplemental records for this well should show the details of ~ny mul- tiple stage cementing ~nd the Ioc0tion of the cementing tool. Item 28: Submit ~ Separate completion report on this form for e~ch interval to be separately produced. (See instruction for items 20 and 22 ~bove). ...... 34. SUMMAIt¥ Ob' POI:LMATIoN TF_~TS IN('LUI)IN(; 'IN'I'Ei~V~L TF~CiTED, I'HESSUIIE DATA AN'E) RECOVEH. IF_,.c; OF' ()IL. GAS. 35. G I~OL,OG I C NI AR KE:I~ WATEH. AND MUD NAME Top Sadleroch±t 10,378~ 8762~ Top lB 10,5~0 Top lA 10,590~ 8966.* Base Sadlerochit 10,630' 8981 ' -- , 'r' 11 , ' ,li,~ ..... , , 11 , ~i r , -- 111 · fill. cOrtE DATA, ATTACI[ AN'I) 'D~r~(~pEi) g}'lOWS OF' ()'iL. GAS O~ WATEH. ' __ . ::~lanticRich[ieldCompany North Americ~"'-:~roducin§ Di~,ision North AIaM,, ,tHct Post Office Box 360 Anchorage, Alaska 99510 Telephone 907 277 5637 Reference' Attached are copies of the following reports' BHP Buildup and Flow Profile Analysis ~. s. ~/l~-l~/~ D. S. 9~.2.~2/9/77 ~' D. S. #9-9 12/10-11/77 Transient Pressure Surveys D. S. '#4-5 5/12:15/78 "" ~ ~,~ ~. s. #s-6 S/l-Z/78 -- ~ R. A. Logue ~ Transmittal #359 Please sign attached copy and return as receipt of data. ;~orth Alaska District Enginer TRANSMI TTAL FTOlII ' J. A. Rochon/R. A. Logue · Well Nane' 'l'ransmitted herewith are the following for the subject well' ~}~(~ Io~ ~-/~' . Run No. Scale Xerox Sepia BL Line Acid or Fracture Treatment Log · BHP Buildup & Flo~,~ Profile Smmey Borehole Geometry Log -' Carbon Oxygen Log .o G~sing Collar Log Cement Bon.d Log Compensated Neutron Log - Cased ltole Core Analysis - Interval Core No. '- Core Description (SMC) - Intmnzal Core Description (Cony.) - Core No. Directional Survey - Gyro - Single Shot - }~ltishot .... ~ .. Engineering Production Log Fluid Analysis 'Fhid Density Ganuna Ray Location Plat -. Monthly lVell Test Data Mud Log Perforating Record State Reservoir Pressure Report Surveillance Reports Temperature Log Transient Pressure Surveys %~3 Logs - Duel Induction Laterolog - Compensated Formation Density Log - Compensated Neutron-Formation Density Log - Borehole Compensated Sonic Log - Porosity[ Log .." ~ .qC . fi, ca_ Return Receipt To: Ms R. A. Logue Atlantic Richfield Company P. O. Box 360 Anchorage, Alaska 99510 g I¢7 ..Z-?.I .... ~, ~ . ~ . . ~hanb,cf~lchheldCompany North American Producing Division Alaska Reg: ~--'' Post Office ,_ 360 AnchoraCe, Alaska 99510 Telephone 907 277 5637 January 13,1978 Reference: Dear Gentleman: The ~llowing material is being submitted he~wit]}. Please acknowledge receipt by signing a copy of this letter and returning it to this office. D.S. 9-1 D.S. 9-2 D.S. 9-3 D.S. 9 5 D.S. 9-6 DS. 9-7 D.S. 9-8 "~.~ D. S' D.S 9-11 D.S. 9-12 Initial Transient Pressure Survey Nov. 14/77 Nov'27/77 Nov. 24/77 Nov,21/77 Nov,18/77 Dec.18/77 Dec.6/77 Dsc. 10/77 Dec.17/77 Dec.21/77 Initial Static Gradient Pressure SurveM D.S. 9-13 Nov.20/77 · D.S. 9-14 Nov.18/77 D.S. 9-16 Nov. 21/77 ~~'x Very /,Truly Yours: ~ ~ Donovan Jackson...~./ .\ ' North Alaska Distr,'t ~'ct~ Engineering DRILL SITE #9-9 PERFO~iTIONAND CLEANUP RECORD May 14-15, 1977 D.S. #9-9 has a bottom hole location in the northeast corner, Section 1, T10N, R15E, Pru~oe Bay Field. Depths of interest: Top of Sadlerochit Gas/Oil Contact Perforations (4 shots per foot) Water/Oil Contact Base of Sadlerochit Junk Left in Hole Measured Depth Subsea Depth Zone 10380' 8733' Not Present 10627-10632' 8947-8951' SMB 10564-10614' 8892-8935' SMB 10528-10552' 8861-8882' SMB/LBS 10517-10521' 8851-8854' LBS 10483-10489' 8822-8827' LBS 10473-10476' 8813-8816' LBS 10409-10434' 8758-8780' LBS 10385-10395' 8737-8746' LBS Not Present 10634' 8953' None RIH with first gun (select fire), tagged bottom at 10678', and ran CCL strip from · 10678' to 9950'. Perforated 10627'-10632' and 10594'-10614' with choke open on 32/64". Saw 200 BOPD from first 5', but second 20' misfired. RIH with second gun and perforated 10564-10594' with choke open on 32/64". Flow rate increased to 1800 BOPD and tubing pressure increased from 0 to 100 psi in 5 minutes. RIH with third gun and perforated 10594-10614' while flowing on 48/64" choke. Flow rate increased to 3600 BOPD and tubing pressure increased to 100 psi on 48/64" choke. RIH with fourth gun and perforated 10528'-10552' while flowing on 48/64" d~oke. Flow rate increased to 5200 BOPD and tubing pressure increased to 500 psi. Flowed for 1 hour to clean up well. Average flow rate was 4200 BOPD and final tubing pressure and temperature were 1150 psi and 32°F. Shakeouts indicated the CaC12 water cleaned up as a slug, the last s,qmple showing 100% oil with a 27° AP1 gravity. The highest observed CaC12 water content was 100% and there was never more than a trace of BS. Because of delay on the Fluid Density tool we RIH with the fifth gun (select fire) and perforated 10517'-10521' and 10483'-10489' while flowing on a 48/64" d~oke. Saw a 90 psi increase in tubing pressure (to 1190 psi) within 25 minutes. Both guns fired correctly. RIH with Fluid Density tool and found CaC12 water/oil contact at 10580' with emulsion present up to 10100'. The CCL run with the Fluid Density log failed so we tagged bottom to establish depth after running the survey. D.S. #9-9 Perforation and Cleanup Record Page 2 RIH with sixth gun (select fire) and perforated 10473'-10476' and 10385'-10395' while flowing on 48/64" choke. Tubing pressure increased 30 psi (to ].220 psi) .within 24 minutes after perforating. RIH with seventh gun and per~orated~ IO40g"-I043.4' while flowing on 48/64" choke. Observed a 50 psi increase (to,~ I270)on' the tubing pressure within 5 minutes after perforating. ~ RIH with dual Amerada bombs makingstatic stops near bottom. Flowed well for 90 minutes on 48/64" choke. Final flowing tubing pressure, temperature, and the average rate were 1220 psi, 41°F, and 7018 BOPD. SI well for 1-1/2 hour buildup, recovered Amerada bombs and determined that the pressure at 8800' ss was 4390 psi and the maximum drawdownwhile flowing was 172 psi, giving us an approximate Productivity Index of 40.SSTBD/psi.: The maximum recorded temperature was 190°F. The total volumes of oil aA. gas ~p..roffUCe~ during the perforating operations are estimated at 933 bbls. of o~i~ ~: 7~ ~ ~i' gas. PDL 6/6/77 DfSTB1BU~I~D TO: sTATE OF ALASKA Di¥1S-[ON OF OIL. ~r GA~ North Alaska District Engineering T RAN S bi I T TA L To' From: Date' 9-8-77 Well Name' Transmitted herewith are the folio:ring for the subject well' J. A. P, ochoh/.P'. R~VJac]~Son 4.? " - D.S. 9-9 ,,¢ Run No. Scale Xerox Sepia BL Line BHC Sonic/Caliper Log BHC Sonic/Caliper - Gamma Ray Log BHC Sonic/Gan~na Ray Log Caliper/CCL Cement Bond Log/VDL Compensated Formation Density Log Compensated Neutron-Formation Density Compensated Neutron Log Core Analysis - Interval Core No. Core Description (SWC) - Interval. Core Description (Cony.) - Core No. Directional Survey - Gyro Single Shot B.'~ltishot Drill Stem Test - Test No. Dual Induction Laterolog Fo~nation Density Log Formation Density Log/Gm, rata Ray Gmmna Ray/CCL Laterolog Location Plat bficrolaterolog Microlog Mudlog- Interval ~ Sample Log (A.R. C6.) - Interval Synergetic Log Tkq)- DIL TVD-Porosity Log Casing Collar Log ~ ea _ Iea ReceiPt Ac~o~¢ledged For: Please return receipt to: Atlantic RJ. ch£ie/d Company North Alaska Engineering ~X~nager P. O. Box 360 Anchorage, Alaska 99510 ~578 CONFIDENTiAL DISTRIBUTED TO: STATE OF ALASKA DIVISION OF OIL ~ GA~ North A]_aska ])istrJ. c:t T R A N S kl I T 'i"A I, To'. ................. From: J. A. Rochon/I). R. Jackson ])ate: June 24z 1977 lfell Name' D.S. ti9- 9 Transm:l'tted herewith are the following for the subject we].].' . Run No. Scale Xerox Sepia BL Line BHC Sonic/Caliper Log BtIC Sonic/Caliper - Gamma Ray Log Bt-lC Sonic/Gamma. Ray I,og Caliper/CCL Cement Bond Log/VDL Compensated Formation Density Log Compensated Neutron. Formation Density Compensated Neutron Log Core Analysis ~ Interva.1 Core No. 'Core ])escription (SWC) ~ ~nte-r'val Core ])esc;iption (Cony.) - Core ~o. D..x ec.t.~ona.1 Survey - G~ro Sing1e Shot Drill Stem Test - Test ~o. - Formation Density Log Formation ~ensity Log/danuna Ray (;anuna RaY/CCL I,aterolog Location Plat Mi cro ] at ero log M[crolog Nud].og - Interval Sample Log (A. R. Co~ ~ ]'nterval Synerget~_c Log 'I.'VD- ])Z L %rD-Porosity Log ],¢.c0.~ p t. Acknowledged For' ])].ease' return receSpt to' A~l,~'tS.c R:id~f:le].d Compan~ ' N6~]'~ Al. as;ka EngJ_neorJng ~qanagor P. O. Box 360 By' fl503 AtlanticRichfieldCompany North Arne~;'-~' Producing Division .,- ' North Aias~ ,strict Post Office Box 360 Anchorage, Alaska 99510 Telephone 907 277 5637 May 25, 1977 Mr. Hoyl e Hami 1 ton State of Alaska Department of Natural Resources Division of Oil and Gas 3001 Porcupine Drive Anchorage, Alaska 99501 Subject: Drill Site 9 3 (31-11-10-15) Permit No. 76-35 . Drill Site 9-4 (13- 2-10-15) Permit No 76-40 Drill Site 9-5 (31- 3-10-15) Permit No. 76-47-'C0~F~: Drill Site 9-6 (13- 1-10-15) Permit No. 76-48 Drill Site 9-7 (31- 2-10-15) Permit No. 76-58 r~ll Si+~~- (33-36-11~-15) Permit No. 76-70 C-'~rill..Si~ 9-g~(31- 2-1u-15) Permit No. 76-76 Drill Site-9-10 (11-6-10-16) Permit No. 76-82 Dear Sir: Enclosed please find Our Sundry Notices of Subsequent Report detailing the work done on the above-mentioned wells. Very truly yours, Frank M. Brown District Drilling Engineer /kb Enclosures Form 10-403 REV. 1-10~73 Submit "! ntentions" in Triplicate & "Subsequent Reports" in Duplicate STATE OF ALASKA OIL AND GAS CONSERVATION COMMITTEE SUNDRY NOTICES AND REPORTS ON WELLS (Do not use this form for proposals to drill or to deepen Use "APPLICATION FOR PERMIT--" for such proposals.) 5. APl NUMERICAL CODE 50-029-20232 6. LEASE DESIGNATION AND SERIAL NO. ADL 28327 7. IF INDIAN, ALLOTTEE OR TRIBE NAME ~' O~L I~! GAS r-] WELL L~[ WELL OTHER 99510 2. NAME Of OPERATOR Atlantic Richfield Company 3. ADDRESS OF OPERATOR P. 0. Box 360, Anchorage, Alaska 4. LOCATION OF WELL At surface 1698' N of SE Cr Sec 2, T10N, R15E, UM 13. ELEVATIONS (Show whether DF, RT, GR, etc.) 54' RKB 14. CheCk Appropriate Box To Indicate Nature of Notice, Re 8. UNIT, FARM OR LEASE NAME Prudhoe Bay 9. WELL NO. Drill Site 9-9 (31-2-10-15) 10, FIELD AND POOL, OR WILDCAT ...Prudhoe Bay Field-Prudhoe 0i1 Pool 11. SEC., T., R., M., (BOTTOM HOLE OBJECTIVE) Sec. l, T10N, R15E, UM 12. PERMIT NO. 76-76 )ort, or Other Data NOTICE OF INTENTION TO: FRACTURE TREAT MULTIPLE COMPLETE SHOOT OR ACIDIZE ABANDON* REPAIR WELL CHANGE PLANS (Other) SUBSEQUENT REPORT OF: WATER SHUT-OFF ~ FRACTURE TREATMENT SHOOTING ORACIDIZING (Other) Perforate REPAIRING WELL ALTERING CASING ABANDONMENT* (NOTE: Report results of multiple completion on Well Completion or Recompletion Report and Log form.) 15. DESCRIBE PROPOSED OR COMPLETED OPERATIONS (Clearly state all pertinent details, and 9ive pertinent dates, including estimated date of starting any proposed work. Began perf operations @ 1200 hrs on 5/10/77. Tstd tree, csg, tbg & wireline BOP's. Pulled dummy valve. Perf'd intervals 10,628'-10,633', 10,595'-10,615', 10,565'-10,595', 10,529'-10,553', 10,518'-10,522', 10,48_4'-10,490' w/4 shots per ft. Ran FDL found oil/wtr contact @ 10,580'. Perf'd intervals 10,474'-10,477', 10,411"-10,430', 10,387'-10,397' w/4 shots per ft. Ran Amerada press bombs. Flowed well .for 1½ hrs. SI well. Ran & set ball valve @ 2197'. Tstd balance & control lines to 5000 psi OK. Bled press above ball valve to 0 psi OK, held OK. Installed & tstd tree cap to 5000 psi OK. Released well to Production Department @ 1530 hrs on 5/16/77. 16. I hereby certify that the foregoing is true and correct TITLE District Drilling Engineer DATE. (This space for State office use) APPROVED BY CONDITIONS OF APPROVAL, IF ANY: TITLE DATE See Instructions On Reverse Side 02~01B STATE. of ~KA Division of Oil and Gas ~ation TO.. [-- FROM: Hoyle H. Hamil~~~ DATE : ~.~ay 25, 1977 SUBJECT: Witness Tests on Sub--ace F~afety Valve and Surface Control Safety Valve for Arco Drill Site 9-9 r4o ~nda~__ ~, ~-~y 16, 1977 - 1:00 ~. Kirk ~'~ite, supervisor for ~zco, picked ~ ~"~t Dr-il~- Sl-~-~--~-~e I had just fini.~b~d a BOP test for Arco on 5-12 and took r~ to Drill Site 9-9 to witness a SSSV and SCSV. P~en I arrived on site, ~ Otis D.B.D. SS~qV was set and control ~ ~re tested to 5000 psi each and. held ~. At 1:30 P~i the SF~L~V was o~ and 1500 psi ~ms ~ tubing. The SC~f w~s closed ar~ 1500 psi alx::m~. SC,~ was bled ~ to 500 psi. I observed t/~s for 10 ~. T~re was no buildup of pressure. The SCSV was opened m~. the S~V was closed and 1500 fsi ab~ve ~SV ~s bled, down to 500 psi. I obse~m~ed this for 15 m~nutes. ?here was ~ buil~ of pressure indica~ that both the surfaoe control safety ~alve and subsurface s~ety valve did not leak. Tests concluded at 3:20 ~4. etyI witnesse~ ~ tests on subsurface safety valve ar~] surface valve for Arco on Drill Site 9-9. Tests w~re satisfactory. Attac~nt Sat'i;~'fac%~r~;~??:'~ ~;.~;~YPe 'Inspection;'; .--T:~]";;:~ Sa~iS-,aCtory]]]'- :.?---Type Inspection yes. No~- I-tem,.'(:~,).-Loca%ion,Gen'eral~.~i~'..-.,., 'Yes ~NO'.'_.-Item;'( ),BOPE-leSts ,( ) () 'l.'..Well Sign . . ( ) '(.:)' ~ ~~ ~t ~ ( ) ( ) .~ 2~ General Housekeeping'-.-~. ( ) ( ) .1.6. ~est fluid-( )wt--)mud ( ) oil ( ) ( ) ~'3~'.'Reserve Pit-( )°pen(:?}'filled ( ) '( ) 17. Master Hyd. Control'Sys.- ~sig ( ) -( ) '18. ~ btls. , ,- , ...psig () 19. R~mote Contr°ls ('~) (.) .. 4,'Rig . -.' -~'~} -~- SdrTace-No ~ Wel 1 s / ." '.L '.." i.... (i..).-~..~.~: (~/) Safety Valve TeS~tS .(') ' ~= 6. SUbsurface-No. We~l ( ) Well Test Data ( ) ( ) 7. Well. Nos. . ,. , ,. (:,.) ()8. Hrs. obser , , - , ( )( ) 9. BS&W ,----~_,__,-~_ ( ) -( ) 10. Gr. Bbls. , , , ~_~ ( ) Final Abandonment () ( ) '( ) '20. Drilling spool- "outlets ( ) ( )"- 21-~ Kill Line-( ) Check val.ve ( ) ( ) '22. Choke Flowline ( ) HCR valve ( ) ~. ( ) 23. Choke Manifold No.- valvs fl~s.__ ( ) ( )' 24'. Chokes-( )Remote( )Po~.(~dj. () ~'( )-';25. Test Plug,( )Vlellhd( )csg( )none ( ) ( ) 26'. A. nnular Preventer,__psi~ ( ) ( ) 27. Blind Rams;__psig ( ) ( ) 11. P&A Marker ( ) ( ) 28. Pipe Rams psig ( ) ( ) 12. Water well-( )capped( )plugged ( ) ( ) 29. Kelly & Kelly-cock psig ( ) ( ) 13. Clean-up _ ( ) ( ) 30. Lower Kelly valve ~si9 -~( ) ( ) 14. Pad' leveled .~r~'~~ ( ) ( ) -31. Safety Floor valve~BV ( .)D/a.;~t _ Total inspection observation time /. ~hr~s~/days Total number leaks a. nd/or equip. Tai~ures /~.~,~.xz- RemarkS ..S S ~. ~'.,? ~.::--'.~-:....'; ~.. ~-? x~ ~j,,~ ?.~.z.--~'. {(2'7'/.:~ ~,"~D). ~.~}/~'.-'~..'z," /:'~.~..i__Z_2~'"'"':..:' cc ', .(q,/~. Notify in days or when ready Inspected by ~,,~/~/~...(~S' Date~;.J/~6.'?;~ ? '. __~. ATIJ~TIC RICHFIELD CO)fPAR~' ~_~ To' Date' North Alaska District EngineerJ~g TRAN S bi I,T T A L J. A. Rochon/p. Hellstron April..' 7, 1977-. Weli Na~e' _... D.$. #9-9 Transmitted herewith are the foll~4ng for the subject well' Run No. Scale Xerox BHC Sonic/Caliper Log .... BHC Sonic/Caliper - Gamma Ray Log -BHC Sonic/Gamna Ray Log ........ 2" ~' 5" Caliper/CCL Cement Bond Log/VDL ._ Compensated Formation Density L0g(GG) ~,, Compensated-Ne-ut~on-Formation Density .' Compensated Neutron Log S" ' Core Analysis - Interval .. Core No. Core Description [~VC) - Interval Core Description (Cony.) - Core No. Directional Survey- Gyro Single shot Multishot Drill Stem Test - Test No. Dual Induction Laterolog 'Formation Density Log Pormation D~nsity Log/Gamma Ray Ganma Ray/CCL S" .Laterolog . Location Plat Microlaterolog Microlog Mudlog- Interval Sample Log (A.R.Co.)-Interval) .Synergetic Log TVD-DIL TVD-Porosity Log 2'" '& 5" Receipt Acknowledged For' By: , . , Date: Richfield Company North Alaska Engineering Manager " P.O. Box 360 Anchorage, Alaska 99510 Sepia BL Line ea. #190 CON:IDENTIAL DISTRIBUTED TO: STATE OF ALASKA To' DIVISION OF-OIL & GAS From: :~.. ATI~NTIC RICHFIELD COMP~uN'f >.~ North Alaska District. Engineering. T RAN S bi I-T TAL J. A. Rochon/p. Hellstrom Date' April ,,7~ 1977 Well Name' D.S. 9-9 Transmitted herewith are the following for the subject well" Run No. Scale' Xerox Sepia BL Line BHC. Sonic/Caliper Log BHC Sonic/Caliper - Gamma Ray Log BHC Sonic/Gamma Ray Log Caliper/CCL.. Cement Bond Lof~iOL Compensated Formation .Densi_ty Log Compensated Neutron-Formation Density Compensated Neutron Log Core Analysis - Interral Core No. Core Description [~VC) - ~ntervai' ...... Core Description (Cony.) - Core No. Directional Survey - Gyro Single Shot' Multishot Drill Stem Test - Test No. Dual Induction Laterolog Fomation Density Log Formation Density Log/Gmmna Ray Gmvma Ray/CCL Laterolog . - Location Plat bf~ crolaterolog Microlog Mudlog- Interval Sample Log [A.R.Cd:)-Interval) .SYnerge tic Log TVD-DIL TVD-Porosity Log Receipt Acknowledged For: Date ' By: Please return receipt to: Atlantic Richfield Company North Alaska Engineering Manager P. O. Box 360 Anchorage, Alaska 99510 }201 AtlanticRichfieldCompany North Americ~.z~_, Producing Division North Alask trict Post Office Box 360 Anchorage, Alaska 99510 Telephone 907 277 5637 March 24, 1977 Mr. Hoyle Hamilton State of Alaska Department of Natural Resources Division of Oil and Gas 3001 Porcupine Drive Anchorage, Alaska 99501 -' ' 4' ~:~ ,.'~ . _ .... i- -;:? <.~;.. '! CONFER; FILE: Subject' Drill Site 9-1 Drill Site 9-2 Drill Site 9-3 Drill Site 9-4 Drill Site 9-5 Drill Site 9-6 Drill Site 9-7 (13-12-10-15) Permit No. 75-76 (31-12-10-15) Permit No. 76-16 (31-11-10-15) Permit No. 76-35 (13- 2-10-15) Permit No. 76-40 (31- 3-10-15) Permit No. 76-47 (13- 1-10-15) Permit No. 76-48 (31- 2-10-15) Permit No. 76-58 (33-36-11-15) Permit No. 76-70 (31- 2-10-15) Permit No. 76-76 (11- 6-10-16) Permit No. 76-82 Dear Si r' Enclosed please find a Sundry Notice outlining our plans for the above-mentioned wel 1. Very truly yours, Frank M. Brown District Drilling Engineer /vp Enclosure · Form 10-403 .~.~ Submit *'i ntentlons" in Triplicate REV. 1-10-73 & *'Subsequent Reports" in Duplicate STATE OF ALASKA OIL AND GAS CONSERVATION COMMITTEE SUNDRY NOTICES AND REPORTS ON WELLS (Do not'use this form for proposals to drill or to deepen Use "APPLICATION FOR PERMIT--J' for ~uch proposals.) O,L i~l GAS F-1 WELL. I~ I WELLI I OTHER NAME OF OPERATOR Atlantic Richfield-Company ADDRESS OF OPERATOR P. O. Box 360 Anchorage, Alaska 99510 4. LOCATION OF WELL At surface 1698' N of SE Cr Sec. 2, T 10 N, R 15 E, UM 13, ELEVATIONS (Show whether DF, RT, GR, etc.) 54' RKB z4. Check Appropriate Box To Indicate Natu~ of Notice, Re 5. APl NUMERICAL CODE 50 - 029 - 20 232 6. LEASE DESIGNATION AND SERIAL NO. ADL - 28327 7. IF INDIAN, ALLOTTEE OR TRIBE NAI~IE 8. UNIT, FARM OR LEASE NAME Prudh0e Bay !9. WELL NO. i0. FIELD AND POOL, OR WILDCAT Prudhoe Bay - Sadlerochit 11. SEC., T., R., M., (BOTTOM HOLE OBJECTIVE) Sec. 1, T 10 N, R 15'E, UM 12. PERMit NO. 76- 76 )ort, or Other Data NOTICE OF INTENTION TO: TEST WATER SHUT~3FF FRACTURE TREAT SHOOT OR ACIDIZE REPAIR WELL (Other) PULL OR ALTER CASING MULTIPLE COMPLETE ABANDON* CHANGE PLANS Perforate i SUBSEQUENT REPORT OF: WATER SHUT-OFF E] REPAIRING WELL FRACTURE TREATMENTH ALTERING CASING SHOOTING OR ACIDIZING ABANDONMENT* (Other) (NOTE: Report results of multiple completion on Well Completion or Recompletion Report and Log form.) 15. DESCRIBE PROPOSED OR COMPLETED OPERATIONS (Clearly state all pertinent (letalls, and give pertinent dates, including estimated date starting any proposed work. Atlantic Richfield Company proposes to perforate selected intervals within the Sadlerochit interval. All perforated intervals will be reported on subsequent report. A 5000 psi WP wireline lubricator, tested to working pressure, will be utilized with all' wireline work. All perforations will be made with hollow carrier type guns at 4 shots per foot. Well will be flowed to a surge tank to recover load fluids and any produced well fluids. All recovered liquids will be retained in the surge tank, then trucked to the oily waste disposal facilities for disposal. Any produced gas will be vented to the atmosphere during perforating operations. The down hole safety valve will be installed and tested upon conclusion of job. ~ i~ ~i, ~, ~;~'./ Estimated start date- 24 JUNE 1977 16. I hereby certify that the foregoing Is true and correct SIG'NED I ~ ~ TITLE District Drilling Engineer DATE ,, i , . , 7 . (This space for State office use) ;:,CONDITIONS OF APPROVAL, IF ANY~' See InstructiOns On Reverse Side DATE' Approved Copy, Returned AtlanticRichfieldCompany North Americ~.[~ Producing Division North Alaslr ~trict Post Office bux 360 Anchorage, Alaska 99510 Telephone 907 277 5637 December 30, 1976 Mr. Hoyle Hamilton State of Alaka Department of Natural Resources Division of Oil and Gas 3001 Porcupine Drive Anchorage, Alaska 99501 Subject' DS 9-9 (31-2-10-15) Permit No. 76-76 Dear Sir: Enclosed please find the Completion Report along with the Drilling History and Multi-shot and Gyroscopic Directional Surveys for the above mentioned wells. Very truly yours, C. R. Knowles District Drilling Engineer KKL/CRK/nb Enclosures RECEIVED JAN 1 ? tgi/ Di¥tllo~! ef Oil and Gas Coneervation STATE OF ALASKA OIL AND GAS CONSERVATION COMMITTEE I nq [ ~ WELL COMPLETION OR RECOMPLETION REPORT AND LOG* !a. TYPE OF WELL: oli, ~--_1~u^s 1 I ~ WELL WELL ~ DRY Other b. TYPE OF COMPLETION: W ELI. OV ER E N BACK nESVR. Other SUBMIT IN DUI, .~ si ructions on NAME OF OPERATOR Atlantic Richfield Company ADDRESS OF OPERATOR P. 0. Box 360, Anchorage, Alaska 99510 4, T.OC~T[ON 0¥ WELL (Report location clearly and in accordance with any State requirements)* At surface 1698~N of SE cr Sec 2 T10N, R15E, UM At top prod. interval-reported below ' 1139'S & 1297'W of NE cr Sec 1, T10N, R15E, UM 5, API NUM_F_ALICAL CODE 50-029-20232 6. LF. ASE D~$1GNATiON A_ND SERIAL NO. ADL 28327 7.IF INDIA_N, ALLOTTEE Git TlilBE NA~LE 8. UNIT,FA/l/VI Of{. LIJL. ISE NAME Prudhoe Bay 9. W~L NO.. t:j DS 9-9 ~31-2-10-15) ~10. FI~ ~D ~OOL, Oil WILDCiT Prudhoe Bay - Sadlerochit 11. SEC., T., R., M., (BOTTOM HOLE Pool OB4 EC'rlVE) Sec 1, T10N, R15E, UM 12, PE~iIT NO, 76-76 l:A D'kTESPUDOED I1~' DATET'D'RF'ACHED p5' DATECOMP SUSPORABANI)'11/10/76 { 11/30/76 12/15/76 p6''ELEVATIONS ~DF' RKI3' IIT'GR'~TC'*'ll7' ELEV' CASINGttEAD21' Pad Elev. (Gravel)gU TOTAL DE.H, ~'~ & TVD~9. PLUG, B~CK MD & ~D~. ~ ~ULT~L~ CO~L., 21. INTERVAI.S I)RILI,ED BY ~OW~Y* ROTARY TOOLS [ ('ABI,E T00]~ 10,800'~ 9128'TVD[10,692'~ 9116'TVD~ Single Ail PRODUCING !N~RVAL(S), OF ~IS COMP~TIO~TO,P, BOSOM, NAME (MD ANDD)~ ~,23. WAS D!HECTIONAL ~ SUHVEY MADE Top Sadlerochit 10,378'~ g762'TVD Base Sand 10,630~ 8981~TVD ~ Yes 24. TYPE ELECTEIC AND OTHEI% LOGS RUN DIL/SP, BHCS/GR, FDC/CNL/GR/Cal, GR/CNL/CCL ~5. CASING RECORD (Report all strings set in well) C7~SI~qG SIZE \VEIGHT. LB, FT. 20" Welded 13-5/8;' 72~/-Butt 9-5/8" 47~/-Butt ['GRADE { DEPT}{ SET (NiD) ,H-40 { 73' HN-80 ~ 2726' ~X-80 ! 10,780.' 26. .LINER t~C GILD , SIZE I TOP (2'iD~ [ ~OTTO~/i ('MD) tSTkCKS CE2IEXT* [ [ 28. PERFOEATiON$ OP~ TO PRODUC~ON (interval, size and number) NA 30. PI%ODUCTION HOLE sIZE ] CEMLNTING RECOILD 30"[300 sx Arcticset cmt 17-1/2"15950 sx Arcticset cmt 12-1/4",[!000[ ,$x Class G Cmt I 27. SCi[EETq (MD~ SIZE 5-1/2" 2P. TUBING £~_Rq O.U N T PULLED DEPTII SET (3.(D} ~ PACKER SET 10,302' , t 10" ] '60' , ,,, ACID. Si:C?, l;'ilA.(:'[ UHE, CkL,IENT SQU2i;?Z2:. ['TI'C. D,~I'Ii I~N'I'~ziV.~L (MD) NA DATE FIRST PIi©DUCTION [ P~ODUCT1ON M}SI[{OD (Flowii~g, g.':a3 Iff[, palnping--size and type of pump, NA CI-iOXE SIZE PP~OD'N FO~ OI~EBL. TEST P~t~!OD ~6%V~ TUBING 31. o~sPos~v~oN oF oas (Sold, used/o~ ~ueL vented, et~.)" 32.LI~T OF ATTACHMENTS AM'OUN£' A.ND l',21b,'i) {O[;' NIA'IE:IiAL USED Drilling History, Single shot, Multishot & Ovro Direction~t¥l~?~aO.~ and ~a, c,,.o,,,...,.._ __ ....... 33.'I hereby certify that the foregoing and at[ached information is complete aha correct as determi,~d from all-avfit~fl~};~(~r~s ' ........ UII SIGNED ~_ _ TITLE ..... I)A' E _ __ *(See Instructions ,and Sp. ce~ lot Aggifion~[ D~t~ 0W Reverse Sige) INSTRUCTIONS General: This form is designed for submitting a comple~'e ar~c:l correct well co,'r~.p!el,or~ report all types of lanJs and leases ~t) AJaska. Item: 16: Inc~Cato vvh~,:.!~ e]evatiot~ :s ~:se,,J as refer(;,~(~ i,%'¼(.'t, r-~, o'!~t',r.',.:~(, ~,bc,,~,r,,~ fo' (~o['~h merits given ~n c_.lher spaces on 'lhis forr~ and ~r'~ any a'..~,3: Items 20, i~nd 22:: If this well is completed for separc~tc F~r~'cJz;c',,or~ !ror*~ r~Ort, lh.'~n or~e ~terYal zone (multiple co*repletion), so state ~n ~tem 20. ,]nd ir'~ ~te.~', ?? sk~©,v thc.-, [_~c;J,.~c-~,r] intcr'¥~[, or top(s), bottom(s) and name (s) (if any) for only the in~er¥~ ret~orted ,ti ~ter~ 30 Suhr'n,~ a sep~-~rate report (page) on this form, adequately identified, for each add,t~or~)l ,r~te~ val to be separately produce.d, show- ing the ackJitional data pertinent to such interval. Item26: "Sacks Cement": Attached supplemental records for this well shoulJ show the details of any mul- tiple stage cementing and the location of the cementing tool. Item 28: Submit a separate completion report on this form for each interval to be separately produced. (See instruction for items 20 and 22 above). 34. SUMMAIiY OF IVORMATION TI~'I'.5 IN('L. UI)IN(; INTEIiVAL TF~STED. f~t~E.~kSUF{E DATA ~'~C()VERI~S ()F OIL GAS. WAT~ AND MUD NAME , Top Sadleroch~t 10,378' 8762' Top lB 10,5~0' 8902' Top lA 10,590' 8946' Base Sand 10,630' 8981' afl. (,~l~ DATA, A'I'I'A('II llRIRP ~{?}{~PI~ONS OP LITHOLOGY, POROglTY, F[IAC~I{F~ APP~NT DiPS AND Dg*l~C"l'~l~ SlIOWS O~ OIL. G&S OR WA~. DS 9-9 Drilling History API#50-029-20232 ADL 28327 Permit No. 76-76 Spudded well @ 0600 hrs 11-10-76. Drld 17-1/2" hole 2750'. Cond hole for csg. POH. Ran 71 jts 13-3/8" 72# MN-80 butt csg w/shoe @ 2726', FC @ 2645'. Cmtd csg w/5950sx Arcticset cmt, slurry 15.2 ppg. Cmtd upper 13-3/8" x 20" anul thru 1" pipe w/150 sx Arcticset. Installed & tstd 13-3/8" pkoff to 2000 psi OK. NU & press tstd BOPE. PU BHA. RIH to FC. Cond mud. Tstd FC, csg, & shoe to 1500 psi. Drld shoe @ 2726' & 10' new form. Press tstd form OK. PU turbo-drill. RIH Oriented & drld to 3078'. Tripped for BHA. Drld 12-1/4" hole 10,800' Circ & cond for open hole logs & dropped multi- shot. Ran D IL/SP, BHCS/G~, FDC/CNL/GR/CAL. RIH to cond for csg. Chgd & tstd 9-5/8" rams. RU & ran 9-5/8" 47# butt csg w/shoe @ 10,780'. Cmtd w/lOOOsx Class G cmt. Plug did not bump. Floats held OK. Installed & tstd 9-5/8" csg pkoff to 5000 psi OK. Chgd rams & tstd BOPs. RIH & opened lower FO @ 2420'. Circ 9-5/8" x 13-3/8" anul. Cmtd w/3OOsx Arctieset cmt mixed w/0.2% D13R & 0.2% D59, slurry 15 ppg. Closed & press tstd FO @ 3000 psi. Opened upper FO @ 2295'. Preceded Arctic Pack w/wtr wash. Pumped 300 bbls Arctic Pack w/break thru @ 154 bbls. Final returns 0% contamination. Closed & press tstd FO @ 3000 psi. Drld FC, float shoe, & new hole to 10,817'. CO to top of cmt @ 10,227'. Drld medium hard cmt to 10,624'. Ran GR/CCL & gyro survey. Set EZ-Drill @ 10,671 PU stinger, stabbed into retainer @ 10,689' w/stinger. Broke down form @ 3800 psi. Established pump in rate 2.5 BPM @ 3500 psi. Mixed 250 sx Class G cmt w/0.75 D65 & 0.3% D13R, slurry 15.8 ppg. Squeezed w/225 sx below retainer. Final press 3100 psi. Rev excess cmt above retainer. Circ. Strapped into hole & drld EZ Drill @ 10,689 & 20' of soft cmt to 10,709'. Tstd csg to 3000 psi OK. Displ hole to CaCI~. Chgd rams to 5-1/2" & tstd BOP's to 5000# OK. Ran 9- 5/8" gauge ring junk bskt. Ran 9-5/8" EZ Drill BP & set 10,692'. Ran 5- 1/2" completion asbly w/shear sub @ 10,302', top @ 10,299', Baker SAB packer @ 10,160', PBR @ 10,115', "XA" sliding sleeve @ 10,072', R ni~@ ~ Landed tbg. Press tstd tbg hgr w/5000 psi. Displ & press tstd ball valve control lines w/5000 psi. ND BOPE. NU & tstd xmas tree to 5000 psi. RU & tstd lubricator. Retrieved dummy valve. Dropped ball & set pkr. Ball sheared @ 2850 psi. Press tstd tbg & tbg anul OK. RU lubricator. Opened sliding sleeve @ 10,068. Displ tbg w/253 bbls warm diesel. Placed 20 bbls in 9-5/8" x 5-1/2" anul. Closed & press tstd sliding sleeve to 3000 psi. Ran GR/CNL/CCL logs & dummy gun. Set dummy valve. NU xmas tree. Began 48 hr press tst on tbg & tbg anul. Released rig @ 2400 hrs 12-15-76. RECEIVED 'JAN ? 977 A PETROLANE COMPANY REPORT of SUB-SURF.~CE DIREC T#OtVA L SURVEY Atlantic Rich£ield COMPANY D. S. 9-9- WELL NAME Prudhoe LOCATI ON JOB NUMBER Al176 S0229 TYPE OF SURVEY Multi-shot DATE 12-15-76 SURVEY BY Jay Martin OFFICE AlaSka MAGNETIC MULTI.SHOT .SURVEY DECLI.NAT_I_ON__3._]. .... DEG., ~ .R'A D I.uS' OF- "CUR V-A-T'~J~-E'-'-~ E T'HO"D''' 'OF'-'~¢.OH RU TA T.I.ON S __C_OM..P_U .TEl D F.o. iR]_E~A.S-_T_'.~'AN.-_''~',/I-H' .[_pi.5 ~oc K ..................................................................... R E-~ 6R D--C~-~ .... SLiRVE-Y ?L_L__~_C. ALCUL_AT!ON$ .pERFOR~,~E9 .BY ! B N ELECTRON!C_ ........................................... TRUE ......... ......................................................................................... DOG. LEG -_.F.!:~. S, DRIFT VER'T ICAL ......... i~...SUB' ....... .....ii'iDR IF..T._'.~."~.-~'~.~'"i_~-O'..T.AL_.¢O.ORD_!J~.A_T._E.$ ............ C,___.L__O .... S ...U.._.R.__E ...... .5 ............. SEV..ERI.TY .SEC-T--~-ON-- DEPTH _SEA ........ DIRE~ D.[$TANCE ...........ANGLE ..... DEG/].OOFT .............. D [$T-ANCE-- D..M D E G, D ..... M 5 ..... ii-._.~'iiiO"'-i~"il0 '-~'-'O-~'i.-._i~--.._.-_~';"O".'O.'-_~.~ii~'.~T"Z~-'4'i';-'0 C~'i_~.'~i.$'2 ~"iO~-EIII ]. 6 A 5,00 .. N ......... 673., 00.:___~ ........... ;~.7.7.7.,_3 ~+.....N ...22 .... 1_5 ........ ]. .... E ........ 0,000 ................... ], ~ 9...l..,. 0~, ..... ~2 0 ]0 ~t+].,99 z+87~99 $Z6~O0-F- ].8A, Z~87 N .......... 67~+..~..0~ .... F~ ......... ~...7_7.~.,_7_7__N._.22 ..... 18 ...... 26 ...... E._ ........ 0~092 ...................... ~90~..~--~-- oo ..... ............ o ...... .2.750 ...... 0 ~5 .....2.7.~.9..,9z 269~ ~ 92 ..... N~ 5 ~OOE ].6S ]. ,~ .... ~ 67_8~.Z.6_.E.. ............ ;L..7.66,8.Z .... ~...22 ..... ~z~ .... 29 E ............ 0 ~Oz+O .................... ....... 2852 1 50 ...... 285..1,._8.9 .......... 2797.,89 .584,00E 1632,01 N 680,~+~.__..E_ ............ ~..768,18 .N..22 ....... 37 .... 5.9 E ......... 1,069 ................... ].5.88.,.0.7 ..... _.2. e ~,~ ........... ~ ....... s 0 .... ~?_~..,.27 .... Z.8..~.z....'?,+ ......... ~ ~.~,o OK...~..z. 6 s s..z.6.1~_.N.-' i. iii.i.6~_~_.,~+.Z~..~ z 77 z.....z ~ ...... ~... z z ..... ~+6 ........... z ...... ~ ................. z. ~.~ ~ z~..ez._~.6_. .sos~ 8 .~5 .......... SO.s..6.,_.t..z ...... 2982, ~. N~]..eO.E ......... ~83~oZ.~ .~ 8~S,96 ..... E.'__ ........ k'?8.0..,O9 ....... N ZZ ~8.._~+~ .... ~ ~+.67~+ ...................... ]..~0.~o.00 ....... 3.~30 ~2 ......0__~_~_.2._7..?...5._?- ...... S073~7 .......... N59,00E 1.62~8,85 N ............ 707_,66__E._ .....~.79~,30.N 23 ],.~ ..... ~+2_E .......... S,~].~+ .................... ], 6_]..9..~ 6. S._ ~222 zs ...... .s.O~..s....z_.Z2_.,..~.O~.~.ZGS.....so ..... N~2.'.00.~.--',i'ii.'.z..658._8~ .... N ...... ?2.~_o_.S..~_.F._ ZSZ..O...~+e .... N_ZS ..... 37 ......... Z ..... ..... SSI. 5 .],~ SO ....... S3.07_*..S~ ....... S25S,.S~. ........ N66~50E 1668~96 N ............. ?~6,..3..0 .... ~ ....... ~..828.,22..N.2~+ ......... ~ ...... SS __3A08 .]6 ...... 0 ....... S.396_,...8.~ ........... SS~+2.,.8~. ............ NTO,OOE 1678,~], N .......... 769,.7.~ ..... ~ ....... ~,82~6oA..1 N..2~ ..... 38 ..... ].7 ~..3.~0.1 ~.8 ....... 0.__.~.~.8_5_,.7.8_._~A.~ ~.~.78 .... N7.~.,..0 ¢.E___.~.686.~,.7.1 .... N ..... _7.9 ~.o..60_LJ..8 6.~..o..9.~ ..... N_.Z ~ ...... ~. ~ ....... 9 ..... __.(' 9~+ 20 SO ...... _]5.?.3.,5.? ......... S5].9o57 ........ NT~o. OO.E ........ 16.9~o~+2_.N ............ 82.~9.9 E .... ]._8.8.5. o~9 N._25 .... 56 5]- E ............ 2o69.~t ~---7.38,-.~S .... .... )o86 2~ .......... 0 ....... ~6..~_.9.~.0..]~_ ..... ~605~ 0 ], ........ NT.~+ ° O...OE_ ......... ;],.7.0 ~ o.],O_N ............ 8~..7 ~ 6.8 ..... E_ .......... 1.9.08. o 66._...N_...26.._,_z+2 ......... 9 E .................. 2.o722 ............ ].769 ,.&8 ..... ~_~_7...80._2. 3__.]..5 ........ 87...~.~._*_.~.6_, S..69]._.:~6 NT.],..,O 0E~.~..~7..1.6.o 20 .... N ..... 8..9.2...o_8.~._E ...~.9.3~.,..5.8 ..... N.._..Z7 .... 29 ....... ;~ ]- __.~ 8.7 S 2.~ .~0 ....... $. 8 ~O.o_.5._O___._._S 776 o 50 ........ N 62,00 E ........ ~7.31_o ]. 9 N 9 Z.7.,..~6_._E_., ....... ~ 9.6 S.,.9.~......N._. 28 ..... 10 .... 37 E ............... Z, 1.~ 9 ............... ]..8.~_9,06 ....... .... 3966.....25 ......... 0 ...... ~ 9. ]._~ .7 9. .6._ ~ 860,96 .......... N 56 oO.OE ........... ~ 1.,2 ~ .... N ............ 980.,...7.2 ..... E_ ....... _:L..9_9_7.~_.~6 ..... N ..2.8. /+.~+. ~ 6 E ............... ~,o 272 .............. ]. 8_7.7, S ~ ...... ~.__o..~.?_.z? ..... O_.~S..t~_8_,_.~? .S..e4?._,.~.~ ....... N~...~..O. OE. ....... Z.7 ?.~.,..3.S N ..... e9~+.,_.3..2 .... E~_Z..O.S.S..o.e.~.....N....Z 9 .... ]. 5.. S ? ..... 2 ...~8 ___~2.~7 ..... s..t ..... .s ~ .......... ~.~_6.2_.,_.6_9 ~..Z08,6.9 ......... N~.7...._OOE ............... Z¢ 8s .... ~ ........... t_o..~..O_.,.67__E_., ...... Z_.Z_Z_~.,.7 S N...SO Z.~ ........ ~ E ............ Z., 7...~.~ ................ ZOO~ ,.~Z_ A.~z.8 S8 .... 25 ....... ~_.~_.9.2..,..76 .... 43;8~.78 N~.8,.~O~ ~ .8.8. .... ~ ......... ~.Z0.6_.,_~6_.~ .... ZZ.$O...~6 N.SZ .... ~.~.8 E .................. z. Gz.z ..................... 22~7,78 ..... ~&.6..22 ..... ~.~. ...... s 0 ...... ~..~.6_~.~.~_9 ....... ~.0 ~.79 ...... N.57 · ~ O.E_. ....... ~.9.4..~..,8.7 N ...... ~.2.~%.,_~.~_.~_. _ 2..~.~.~., 0 B .... N Z ...... ~ S ....... ~ ~ ....... ~7~ ~ ....... 0 ......... ~.~.~.,_08 ..... A~.79.,0.8 ~6~00~ ....... 1978~68_.N ............ ~.3.20.,.26__E ............ 2..3.72,.,9~ N_..3~ ¢0. ~ , ...... R_E_QO R.D _O F .... SURVEY FORMED _.BY _I DEPTH AN6LE DEPTH D M ..... DOG--LBG. SUB ........ :_DR ] FT T_O._TA L _.¢ O0 RD INA T_ES .................. C_ L_.O_ S._ .U__R_..E $ .......... SEVER I_T_Y SECTION SE,A .......... D I R EC b ! STANCE ................ ANGLE ..... DEG/!OOF. T____]_D IS.TANC DE.G, D .... M .... S .......... .__~90 2_45_.30.__A6.65.,_60 .... ~6_11.,.60_..N56 · OOE .... 20 50,82_N !~20_,47_E ........ 2~94,72_.N,_~&.._.&2.._Z8 E ..... 0,9.8] &ggs..45 .... 5 ..... ~7.3!,.02 .......... ~67.7,02 N56, 5089.._.~_.~5 ..... ~797.,58 .......... 4743.,58 ........ N56, ...... 5276.,._~.._0 ........ ~.9~.0.,.5.2 ......... ~876,52 N56. 5368 ~3 50 ~996,7.9 ........ ~9~2_,~9 N56. 50E ..... 2087.54_N ..... !475.,43_E _2556.~1...N_..~5 15. 6..E 0,517 ................ 2486,02 OOE 212~.,42_N ...... 1530,62_E ............. 26!8,39.._N_.35 .... 46 20_.E ~,.__0.~48 ....... 2551.83 50E_ .2_16,0,__78_N.. 1_58~_.;.0_8_E ..... 2680,,42_N]~6 ..... 16_.~7__~ .... 0.,84.1 ..... 26.Ll,5C OOE ....2196.,.52__N ....... 16.40,59_E ...... 2741,58 .... N.....~6__~5.22_.E .......... i.,32~ ................ 2682.04 OOE ._22.32.,20__N ........1693,,50__E ......... 2801,,91 N...__37 11_.10 E .............0,17~ ........ 27&.5,34 00 E .... 2.Z,~ .7.,9.7_N .... 1_7.~ 7,.., 53_E ...... 2863 ,.1.~_. N_3.%3 6_ ~ 8..,_ E ........... 0 ..88 5 5 5 ~ _ ~ ~ .... 15__5..1_29,97 .... 50]5.,97 _N57,5.0E ....... 2_~0~,15~N ............2802.,2~_.E .......... 292-~.48_N_38 ........ 2_.36 _E .............. 0..3_75 __56 ~ 7. ~ ~ ..... 0 ....... 5196,..]_.3 ....... 51 ~ 2,_7.3 ..... N 56 ,. 5.0 E ...... 2.~ 3 8,42 .... N ............ ! 85 6,..54 ..... E ......... 29 85 ,.79 ...... N_.3.,8 ...... 2 b__~ 9 ..... E ................. 0_, 58 ~ ........ ........ 5833 _44__ 0 ....... 5~3...3.0_,.~ .... 5276.., 24 _._N57., O.OE .......... 2~.10., 1..3__N .......... 19.6~, ~7 .... E ...... ~.109,26....N.,.~9 ..... 10 ....... 5~._.E ............. 0., 58~ ............ 3066 ..... 5.926 .._4 4__~0 .... 5_~9_6..,_..8. 65. 3_4 2 ,.86 ......... N56,5 0 E ...... 2.~ 5,7 ~_N ..... ~ 0.18.,.6 ~__E ........... 3171 ,.18 ...... N_3 9_3 2 ........ ~ .... E ................. 0,599 ............. 313.0 ~.6Q...18_.~4_.0 ......5~_62..,]..6~5.40.8_.,_? 6 ....... N 56_.,.00 E .... 2_48.~_,.~.8_N' ...... 2032., 01_~ .... .~2.3 2,22_N_39.~. ~_..6.6_E .... 0,603 6!11 .... ~ 0 - 5529,66 5~75,66 N56,00E 25.~_7..,..50 .... N ............ 2..~25.,..57_.~ ....... ~g94,_8~ ....N_._&O__IO__~O E ................ 0..,0_00 ~6.204__.43__~5 _5596._._7Q _.~5.~2_,..70 ........ N56,.O. OE;. ...... 25.5~,_.5~._.N ...... 2..12.9..,..0~ ..... E ............ ~356,_89 N._..AO ....... 28 ..... 3.0 ..... E ........... 0.,269 ........... 3.322,2( ..... o 36 0,,. ~ ~ ........ 0 .... 5!09_.,,.0.5 ...... 56,5 5.0 5 .......... N 59....0,0 E ........ 26 Z 1...90 ..... N ........ 22_?..0.,.1 ~._..E ............ 3,~ 60.,.57 .... N_~ 0_3.9 ..... ~; .... E ................. 1.,.6 28 ........... ....... 6 ~ 5 ~ _. 4 ~_ 3, 0 ...... 5Z.7_6_.. _~ 9,__5 ] 2.2_...39 ........... N 5 8 ..0. 0.~ ._ 26_46., _1.7__ N ...... 2_ ,32_6_,. 06 .... E ......... ~ .52.3. ,. 18 ..... N _. 41._18_ _59 ....... E ................... O_ · 7 ~ 6 ............. __6.~A8__~.,~_3..0 ..5.8.~%,~..0__. 5Zg.&._O0 _,.~ 5.~..,.P..OE. ~.6.8.Q_,.29_..N~ZZJ¢.l,.,_7.~__E ~..5.85., 61 .... N_A%}7_2 8_b ...... L,173 ..... __66 ~ 2_4 4 ....... 0 59!._!_,9~ .... 58 52_,9 Z ..... N 58,0.0 E ....... Z.T_~.&., 25_N ...... 2.63.7.,16 ..... E ............ 36.~.7., 87 ..... N,_,_~L_5 5_..& 5_ E ............... 0 · 7 3.9 36 .~_67_~ 5_A~__5.5~93_9_,~.6 ..... 5_92%,.56 .... N5 8.,.0.0 E ....... ZTAS., 83_ N ..... 2492..,. 50 ..... E ............. ~ 2. ! 0.., 61 N.._.42 .... 12 ....... 0_.. E ................... 0 ,. 07 ~ ...... 368 6.., ]7 0 ! I ]4 4'].]]]0 ]"--]6~]]~],]312]--'% 6] Z~.]~.].]32]']],.N 5..7¢0¢ E 285_0,5 %.._N ...... 2. 6 ~ ~.,.Z 6_E ........ 3. 89.&,.9 8 ..... N,.. 4Z_ 5 7__2..Z......E ................ 0.,5.3 ~ .................. 38.75, _] ! Q3...__4.~____5 . 6.2_~_~_~_5 _ _ 6_1_8,9,,_4.~___N..5_8.,_0.0 E~ZS,.8.A...,._93_N ..... 2.7_0~,.,..20_E _~ ~3.5.6.,.92_ N..,_43_._1.~ 4__ E .........0-,535--_- .... 7 ~ 95.. ~ 3 ..... 30 .......... 6~09,86 ...... 62 ~5_,.8.6 .......... N 58.,.5_0 E ....... 29.1_8 ,A ~_._ N ...... 2Z.62~,.._~_5__E ....... ~.D18,.~ ~_..... N_._43 25 ...... ~3_._ E ............... O, 69-~-.: __?286...4 3 ...... !5 ....... 6~76,_00_ _63.22.._00 ....... N 58_,50E ....... 29_5_I ,09 N ....... 2815_,63 ..... E__L ..... ~_07.8,,82 .... N._43 ...... 39 ....... 25_,E .................. 0 ,.2~ 5 =-.,: ~Z7.__.43. ......... 0 . 6.~A~'~..2 6_.38.~_,~2__.N57_,.0,0.( ~_9.~A,~9_.N___2..8.&8_,_2_~_E .... 4&_39,.,A.8_N.._~ 3 .... 51_..5.0 _..E..._] ......... 0., 81 ~.] . .......... RE COR_ D_O.F__SURVE¥ AL_ L C_.A_L_C_._U.L_A_T_I 0 NS_P_ER f t R U E .DOG-L~EG _MEA S, ~.DR IF_T__V ER.T_ I.¢A__L. ....... ,SUB .......... DR ! F T T.O T AL_._¢OORD ! NAT_ES ................ _¢ L_O_$_.U.._R_E __5 ................. SEVERLT-Y. SECT- I-ON-. _D_ EpTH _.ANGL.E ........ D E P.T..H ............ SEA ...... D !REC DISTANCE .......... ANGLE ....... DEG/iO-OET-........ D.I-.S.T.AN C E- D M DE.G, _O ........ M ..... 5._ · ,., 60 z+ 3 0 _ §.5.Z(;_..2.6 .. 6.5.2.Z_, 26 ~N5.7.,_0.0.5 _3.0.5_1_,.34_~N~29..7_:t..5.0_E _ Z+.Z60...56_N_4,-4~-.1-5 .%-5.- 15 .... 0 .-.74.1. 4-24`-7-, 6-7-- 7651 ._43 ....... 0 ..... 664.2,_.8]. .... 6588,81 .......N55.,..SQE ....3085,82.N ...... 3.025.10-E- -4.32].,29-N-Q,4.--2-5 50 E .............. 1.t-2-4, .......... 77.z~ 5__4. 3 ...... _5 6~ ~..!..5_1___6657,51 ....... N56_.,.QOF-_ ...... 3.121., 93._N ....... 3. 07_8_ ,.l~_E_____43.8_z+. 22-N-4. 4..--35-~, 3 E ...... ~:0,266 ....... 4.3-7-2-.-8-7-- ___7~8.~3..9._~ 3 0___6_7._8_Q_,~.Q___6_726... 2 O .... tN.5_7_,_0.Q E ~ __~..15.3..,3 4__.N___3.1.3_L._6_4._E _ - 4_¢4_7_,.02--N-~,4`--~-5--5-~- E 0.,-5.0 ~ __.7_93!....4.3 ....... ,O__68A..T...,.A_9_ ..... 67.93.,4.9 ....NS?..,OO[ 3.19..I .. 52 ___N .....31.8_~_..2.6~E_. ........ ~_90$,36---N--4,.4=-56 ......5-5 ............ 0.000 .... z+~+9 8- .- 5 3-- __8.024..?+3 0 ..69~..5.....5_0 6861,,50 .... N5.7,.50F.___3225,.83_N ...... 3237,.60_E.__~.57-0.35 N--~5 =6 ...... 1.5 E ........... 0,367 ~.11.8 ....42.__~_0__~_9.B~_,_.~23 .... 6.9.~..0.. ,.,53___N. 5.6.. ,. 5.0.F.___~.26.0_,_,58_N__32..9.1..,_12_ F____a,.& 3 2,.8 O_ N.-4~ 5--~ 6 .... 1--~ E----,.--O .. 7- 20--------4. 624~,.40- __. 8212 4. 2 ..... }0__,_705.;~._,..8~ ..... 6999 ,. 83 ........ N55 ,"50 E_-~329 ~ .. 09..._N ....3.34.3., 76_5 .... 4`695.2_ 1._N_4,5 ...... 2~.--4.0 15 ................. 0 ..7.1..9 ..... --~4. ~ 8-7 ," :59- .... 8304.__42 ...... Q ..... '/7_.!_2..~...,_9.~ .70.67,9~ ........ N56,.50E_ ...... ;~}30,_6B_J',l ......... 3395.,0.5_E ...... 4.7_5.6.03 N_q.5_32 ...... 53_..E 0.730 ...........4-7.4-8..7-5-- .... 84.9.0...._.4. ], ...... ~·5 .......... 7..260 ,,..5_.7. .... ..7. 206,57 ......... N 57,00E ....... 3.39 7,0 e, _.N ...... 34.9.9...73 .... E ............ 4. 877., :35 N....~, 5-51 ..... 10-. E ............... ~ · 0.7~. .................. __8582_~%_~0 ..... T~.Z~_,.3....~__7_275,3~ ....... NS.7,50E 3z~3.0,.l~_._N ...... 355].,_17 .... 5._ ~..937.,27 .... N_.~5 5-9.-:..35 E ............... 0,362 ......... __8 57..~_kl--lL_7.23.9.9..,_l.2 . ,3~ 63.,.8~_N__3 60.Z..,_.5.7 _ E __ .~.9.9.?_,6 8--N_Q, 6 ..... 7-.2.8 .... E ......0,7.51 .......... __8769 ...... ~ ! ....... 0 L?.4.69..,_93 ......... .74. ! 5,93 ......... N 5 6 ,.00E._--3~.9 8 ,.z~.l_N ...... 3653 · @3__.:E~ 50..58 ,..59 ....N.._~5_1.4`_~.1._...E ................. 0 ,.2 66 .......... ~_8 86 3 ~, 0 ......~ .5 ....... ? 5.~.!..,.Q~ ...... ? ~ 8, '7,01 ...... :._N .5 ? ,. 5 0 E ......... 35 3. 2 ,.1 ~.__N ........ 3 705,2J E ..... 5 19, 09 ..... N ~+ 6. ~ 22 _. 1_3 .... E ............... 0 · 7 3 0 .............. 5 __{:.- n 5.7. 4.0 '~5 .76J,~_,_2 2 ..... 7_5,5.8_,.22. __N 58.~_5._Q.E._~3.5.6.z+.,.66_N .3._7.5_.7_,_3_.1,_E___...5..1..79 ,.20_N_z+6-3.0-,Z5 .... E 0..,.69z+ .......... 5.1._7_5. ,.3. z~.. 91 z+ 3 3 9.._~ 0 ......... 7 75 ~_.,_8. 3 .... 7.7 00,83 .... N ,5_7_.,..5.0 E ......... 3 6 2 8,37 .... N ....... ;..3 ~ 58 .,. 29_E ..... .5 Z 96 · 3 6 .... N _. z+ 6_._.~ 5_. 2 E ................... O, 2.. 6.9 .............. 5 2_9_3 ,.2. 6_ 9328 38 0 7898,92 784.4.,,92 N56,00E 3691,33 N 3955,73 E' 5z~!0,5~ ...... N....~6_.5.8._~8_E ................ ].,.185 94. 2.]..._. 38_.,.0 ..... 7·9_7.~...,..20__79!.8.* 20 ....... :N 56,.00E ............ 37.23,35 ....... N ....... ~00.3.,..;]_0.E.____5.~67,08 ...... N.,.~+7 .......... 4. Z.7_E ................... O, 0.00 ....... ---9514 37 z, 5 804. 5,6 ! 7991,61 .~5..6750.E ........ 3_7.5.5_, 0.7_N~Z~..O.5,0._,_6_7_E ..~,.5.2.3.,.~.5._N_Z~..7_.IQ.__7_E ......... 0.,.3.3.6 96 0.6 ...... 3__7_ ....... ..0...~8..!_~_8_,_7_2 80'6~72 .......... N5.7,0 0 E ......... 3.7 8.5 ,.69 .... N ........ ~+ 097.,..~ 8-E ........ ..5._.5.7..8,53 N._4.7 _ 15 .... 51_ E .................. 0,83 9 ..................... _~969 7 ..... 36_.30 ..... 8..!~9_!.~._6__~___8.13..7..,.64._=._N 58., OOE ........ .381.4. , 95 ..... N ....... 4._ ~ ~.3_,_30 E 5§3.2..,.1.2 ..... N_...4.7-21 ..... 45 E ................... 0., 5.73 .................. 56 _9.7.e 8_3 5..j5 8.8_6.5_,_0_6__8.2.,1..1.. 06 .... N 5 8,,.0 0 E .... 38.~3,/+ z+_.N.__4_!.B_E.,..8,9--E ......... 0 ~.5..25 ............. ..... 98.79 .3 4. .... 1.0 ........... 8.33 9-.5.5 ............ 8. 28 5,55 ........ N 6 0., 0 0 ~ ......... 387..0.,3.5 ....... N ......... 4. 23.3.,.5_B E ..... 573.6, !8 .... N..._.~..7 .... 3 4. ........... I_E ............. 2.05 5 ........................ 5.73.5 996 9 .3 3 30 8z+ 1, z+.,31 .......8 360,31 N6 1,50E ........ 38.9z+, 84. .... N ........ 4.2.7.7_...40 .... F_._ .... 5.78.~ ,9 8 ....... N.._.4.7.... 40....48._.E 0 ,.9.01 ............. 11111'10061 32 ..... 30 ........... e.4:.9!..,.47 .... 8z+37,z+7 N62,00E ...... 3918,,55 N 432..!.,SZ~_E ....... 5..833..,59 ....... r~l....4.7~......z+7._59 E ............... 1,098;.., .......................... AL_L__CAL._CULAT!.ONS PERFORMED BY ...... I .8._N!.. ELEC.TRO~.IC ..... COMPUTER .......................... ~-~'~'; ....DRIFT.VERTICAL. _. SUB DRIFT ..... TOTAL_.¢OORDINATES .... C L 0 S U R_E S SSVER!TY ............... SECTION ..... D.E.P TH ANGLE .......... DEPTH ............. S~A DIREC ..................................... DISTANCE ANGLE DEG/!OOFT ........... DISTANCE--- .................. D ........ M ............................................. DEG, D M S ............................................. ~'~ ~'"~"~'~ ....... ~-~'g~:'-~"-?'~.~ ~2.00~ ~.02....~ ........ ~.,~.~0 ......... ~.0.00 ~ ~..~_~ ,. 0.~ .................... ~...~2 I..02~ 3l .... 0 ....... ~646,2B ..... 8592,2~ N62,5CE ....... ~96~,.~2_N ....... 4'+06,19 E ....... 5926,42. N 48 ..... ~ ..... ~..E .............. 9.8Z~ 5925,.99 . 10426_~0 ..... 5_ .__880B,67 ...... 8749,67 N6~,50E ...... 4005~67 N ........ ~.z~Bg,Bo E ..... 60~5,58 N 48 15 30 E 9,730 ............... ........... m ~ ~ ~ 1..05~7 29__45 ..... 8.882,.54 8828~5~ __ N6~,50~ ...... 402~92__N .... ~.2. ,92 ..... ~ ....... 5060,.~9 N ~8 .... Z2 ..... 16 E ........0.~7~ ................. &060,-2.7- .... 10609 .... ~0 0 ...... 8962,~2 ..... ~.8908,B2 N6~ OOK 40~6~.5_N ...... ~570,~_ E 8!04 69 N ~8 28. 53 E O.~OZ~ .......... 1070~ .29 ~0 ...... 90~,9~ ....... 8989~9~ N64~OCE ...... 4.067.~6 .......N ..... A&!Z,59 .... E ............ 61~9,75 ...... N.~8..~_35 ._~..9 ....E ......... 0,591 .................. 5.!~.9.,.73 ..... ~..0_7.2B ..... 29 ..... ~0_~.9.065,69 ....... 901~, 69 ....... N65,00~ ........ 4072., 66 ......N ....6623.,.70 .... E .......... 6.161,59 .... N _.4B_ ~7 ...... 3.2 .... E .................. !,9.7..0 5.16.1-,-5.8.~ 10800 _29 ~0 ....... 9128,B5 ..... 9074,B5 N65~50E 4087,50.N ............ ~655,90 E . '6195,57 .N ~8 4B. 9..E . 0,3z~2 ......... 6t95,5.7 ........ . . : ..................................................... TRUE 'CODE MEA'SURED- ........ VERTICAl' TOTAl- .... NAME .... DEPTH DEPTH DISTANCE ANGLE .SEA D N S FOR EVgRY gVEN i00_ FEET QF SUB SEA DgPTH, 154 ......................... 154o ........... 100 ................ 0 ................ 254. ............ 254.,,, 200 0 ......... O 354 354, 300 0 454 454, 400 0 554 554. 500 ...... 0 ..................... O 654 654, 600 0 O 854 8 954 9 1054 lO .................... 1!54 .................................... 11 ......................... 1254 12 ~BS.A .... 13 .................. 1454 14 ].64.4_,.82__N ........... ~33-,08 ....g .................................................... ............... i. 644,.53 N ...... 673,22..~ 1644,09 N. 6.73,44. E .1.6.4.3..,_5.0__ N .............. 6_73.,_7. 2 .... ~ 1_6.4g.,_78 .... N 674..08. E i641,99 N 674,39 E .~64.1.,.Z2 .... N ............. 6.74.,59 ..... ~ .... 54, 800'. 0 0 ..................................... 1640,.47.N 674,68..E ................................................................... 54, 900 0 ....... 0 .................................... 163_9,.7 6... N .....674,6.7.5 .............. .o ......... __ 54. 1100 .......... 0 0 .................................................. 163.8,_5D...N ............ 674,38 .... F. ............................................................. 54, ............. 1~00 0 0 i6.3.7,97 N 674.,13 E 54., ........ 1.300 ....................... 0 .0 .... 1.6..3.7.,.52_..~L ........... 6.73.., 8.1 ..... F 54, ........ 1400 0 /_._0 .................................... 1637.,..1~_.N 673,44 E 15.5.4 ........................ 1554, ..... 1500 .... 0 ............................. 0 ....................... : ................... 163.6.,81 N ............ 673,11 £ ................................................... _1.65_4 ___ 1.5.. 54.' ........ 1.60.0 ....................... 0 ............................. Q __ _1.6_3.6.,_36..._.N ................. 6.72,88_._ .................. ~754 .......................... 1754, ~700 0 0 i6_35., 8.0'... N ............. 672,72 . ................. 1854 1854, 1800 0 0 16.35,16 N 672,68 E ..................... .1.95..4 .......... 19.54, ............... 1900 0 O. 1634.,..47 .... N 672,77 E 205..4 ............................. 2054, ................. 2000 0 0 ......................................... 16..33,_76 N 673,0Z E .................... 2154 7.2154, 2100 0 0 1633,06 .N 673,45 E 2254 2254.., ............... 2200 0 ...................................... 0 16. B2..43 .... N ............ 673.,99 ...... 5 2454 2454~ 2400 0 0 1.631,51 N .. 675,52 E '. z,55.4 ........................ 25.54,. ............. zsoo o ................... 2654 2654~ ............. 2600 0 0 i631.,28.. N 677,36 ..... .................... 2754 ................................ 2754, .......... 2700 0 0 i6~t,48 ..N 678,30 .... ................... 2.85~ 2854. 2800 0 0 1632, O1 .... N ........ 6~0,51 ................ 2954 ........................... 2954* ............ 2900 0 0 1633,51 N 685,97 E .................... 3055 ............................ 305.4, ............... 3.000 ............. 1 1 ........................................ 1.641,0.1 N .............. 696.,.19 ..... 315.7 3..I. 5.4, 3 100 .................... 3 2 16..51,7.5_.N .............. .7.12., 5.8_E 3260 ...................... 3254, ............... 3200 .................. 5 ................................ 2 .............................. i663., O0..._.N ............. 733,41 E 3363 ...................................... 3354., ............ 3300 ................. 9 ................................. 4 ......................... i 6.7..4 , 00._N ............. 75.8,21 ..... 3 4 68 3.4.5...4...,____3~0 0 ................. 13 ..4. ...... i _6.83...,_7._9._~ .... _TB 5_,9.2_.]~_ .... ~ 5_7..3 .................... _~.55.4 ~ ........... $ ~ 00 ' ~ 9 ........................................... 6 ................................... 1-6.93,5.2.--N ................. 8 05-:--.E .............. 4122 4054, ..... : ~237 ................ 4154, __ 4356 4254. 4479 4354, 4607 4454. 4744 ............... ~885 .............. 5027 4754, 5168 4854, 5308 4954. 5447 5054. 5587 5154. 5727 5254. 5866 5354. 6006 5454, 6145 5554, TRUE .............................. ............................................................................................................................... DEPTH .......... DEPTH ..... SEA DIFFERENEE .......... EORREET!O.N ..... TOTAL .... COOED :NATES _ ..... :~: .......... ~:'~'. ..... :~oo ................ ~s' ::...-"2':: ...................... ~,.,:'-_ .... _..,.,:__::'~:-'"/:'::%-~..:'~L_.~ .......... 37~9 375~. :700 3~ __ 9 _ .. :717.39 N. S96.2~ 4300 ....... 124 23 ........... 1896,!8_ N ...... 1180.57. ~93B.95 N .... 12~8.7-7 ........ ~600 -- 231 .. ~ ........................ 20~.30....N ......... 1~!0.2_6.-E ~700 273 ~2 ................... 2 :O0..20_._N ..........1~.94.20 ..... 2262.62._ N 5000 393 39 5200 ........... ~72 39 2~9,4~. N 1902,56 5300 512 ...... 40 2422,69. N ........ 1.983.58...E J 2 6283 ........................... 5654, 5600 629 .............. 6<22 57_5<, .... :.:.::..5.700 ............. 06e ........................................... 39 ................................... 263<,.36_N ....... 23.07...0~ '::-/::::/.._:::::.'.:.. ~7oO:::.::::::C/-1::,'::~<. ~oo ~4~ :~ ......................... ~:.:~.~.. ......................... 697 8 ..................................... sl ~. ............ 6 ~ O0 .... 824 : 9 :.28.: S ._I 4..N ........... .......................... 71..17 ........................... 6254- ............ 6200 863 ...................... ~9 g 8.90,0.9 .....N 7'39'3 6454~ 6400 939 ...................................... 37 ....................................... 2990,15._.N 3 ~ ' ' 9 .................. a07 6 6.9 5~., ................ 6900 .......l 122 ......................................... 36 .......... 324.5,.. 24 ..N. ...................... ~'21'2 ............................ 7.05~, ...... 7000 11~ ........................................ 36 ..................... 3296,09 N ................ . .... , : ....... ......... ......................................... ~RUE ................................................................................................................................................... .............. MEASURED ........... V_ER~_ICAL._.SUB._. MD-TVD ............ VERTICAL DEPTH _D~P~.H 5~A..._D ] F ~ ~' .... F.R~N~E .... ~ORRECT.I ON__ ~-O~A L .... ~OORD I NAT.E5 8347 7.154, 7!.0.0 .... 1.193 %5_ 3.3 ~5-,-56._N ............. 3 ~1-9-, O-O-E ......... 8~81 ......... ?254, ...... 7200 1227 ............ 8615 .............. 7354, ...... 7300. ~26~ .......... 3~ ................ 3~42,06_..N._ 3569,40 E .................................................. .... 88~0 ...................... 755&, ....... 7500 ..... ~326 .......... 32 ........................ ~5.38.,L.7....N ...... 37.~6.,59 E ............................................. 9012 7656, 7600 ~3~8 32 ..................... 3~83.,59_...N .... 3.?87,42 £ f 9~2 775~ 7700 ........ ~388 .......................... .... · ........... ¢._.N ......... 3857.,43 .... E ................................................ .. 9P7~ ....................... 7854, 7800 ~17 29 ............ 367~,86_.N 39Z6,0B. E ............................................... __ 9398 ............... 795~, 7900 2&~ 27 ..... $7~B,~0 N_. 3991,~1 E "' . .................................... 952~. _.80~, ...........8000 ........ 2870 ....................... 26 ............................ 3758,.69..._N ....... 4055.,.75 E .................................................................. ............... 96~0 ........................ 815~, 8100 1~96_ 26 ............. 3Z99,98 N ....... ................ 977~ .......................... 825~, 8200 2520 26 ................. 38.39_,08___N ...... 6-2.81,9. Z-_E .989.6 ............ 8~5.~, .......... 8300 ........... ~5~2 ..................................... 22 .......................... 3.8~,_!0...N ........... 10016 8~& 8~00 ~62.. 20 ........................ $907 .2.3...N .... 4299,9.9. E 10135 855~ 8500 158! ...... !9 ..................... 3937,0 ~ 30 E ................................ ' 3_._N .... 4356, ._.1.0252 86~, ....... 8600 ........... !598 .............................................. 1.7 .............................. ~.96.~,.69._N ............. ~ZO.,2.8.E .... .. ~0368 .................. 8.75~, 8700 ~6Z~ ~6 .... ~99~,57 N ~463,Z4 E .................................... ............. ~0~8~ ................. 8...85~. 8800___Z630 ......... ................. 10599 895~, ........ 8900 .......16~5 ............................ ~5 ................................... ~04.4.,66..._N ........... 4566,30 ..... E ............................................................... .... I071~ ............................ 905~, 9000 1660 ...... ~5 ............. ~069,72 N 461.7,46 E . .............................................................. FEET OF MEASURE~..DEPTH., ............ ' ......................................... TRUE ....... 1'4, E"'A S UR E D ........ ----V-E RT I'C AL ............ S U B ............ DE.P !.~_ ................... ~EP ~_~_ SEA TOTAL. C OORD_,T, NAT. E,S 2000 1999. 1945. 3000 2999, 2945, 4000 3945. 3891, 5000 4734. 4680. ................. 6000 ........................ 5A'.4g , ..... 5395 7000 6169. ..........6115 ~'000 5897' ' 6843 .............. %0'000 84~0. 8386 1636 1759 2089 , 2~74 · 2846 · 3217 · ......... 3579 · 3903 1639, 5 N 67.4,6.3 163~,1~ · ~0__..N ........689..,..91 ..... · 42 N 972,.77_ E .............................................................. ,61 N .2.0.6i_,..48_E · 41N ........ ,i5 N 3223,73 E ,05..N VERTICAL SECTION ' ' ' SCALE I" I000' . ; ..... .... ATLANTIC- RICHFIELD CO. .... DRILL SITE 9-9 800 · ; ....... ,. MAGNETIC.._MULTiSHOT. ' '" .............. RADIUS OF CURVATURE METHOD 1200 ..... 1600 ; ....... · 2000 ALL DEPTHS SHOWN ... 2400 ARE TVD - 400 28OO ;5200 ............ 4400 ................ ........ ....... _ _ 8800 8400 TVD-' 9~1Z8' ' 8000 TMD= 10~800' HORIZONTAL VIEW SCALE I"=1000' ATLANTIC RICHFIELD CO. DRILL SITE 9-9 MAGNETIC MULTISHOT SURVEY RADIUS OF CURVATURE METHOD i ALL DEPTHS SHOWN ARE TVD 4400 3,600 $200 52o0 56o0 4800 7600 7200 - 6400 6000 68OO FOR ATLA~TIC RICHFIELD COHP^NY TYPE OF SURVEY: SURVEY DEPTH: FROM Surface LEASE:, Drillsite //? FIELD: Prud?~ oe COUNTY/PARISH North Slope . DATE OF SURVEY Dece~mb(~r OFFICE: ~nchorage: Alaska C~.yr osc opic Multishot JOB NO. 10,80o Fr. WELL NO ..... 9 , STATF A l ~-~ ~ kn sU3-~6~37 ,. 27l~-6696 t ....... ' ' , SP~.RRY_,.SUN W[l' ~SUkVEYING CO[~PANY ' ~.. P/;GE 1 ANCt-iO& ,~E, ALASKA ATLA;~TIC RICHF!EL~ CO~P~-~,~,Y DATE OF SUR~EY ~,,~,, 9 ~976 dOG t,U~,~R SUS-1613T ALASKA KELLY BUSHZNG ELEV. = 5~.03 FT, TRUE SUB-SEA COURSE COURSE DOG-LEG TOTAL ~tEASURED VERTICAL VERTICAL INCLINATION DIRECTION SEVERITY RECTA GULAR COORDINATES ..... VERTICAt DEPTH DEPTt4 DEPTH BEG HIN DEGREES BEG/lO0 NORTH/SOUTH EAST/WEST SECTIO.~ . O; · 100 200 5O0 qO0 5O0 o,00 ...... rS~,O0 ................. 0 .......... ~ .......... S ....... 0., 0 W ........... 0..00 ...... 1645,00_N ................. 673,00 E ...... 9~.99 ~5.99 0 11 S 30.~8 W 0.16 16q~,86 N 672.91 E lBlq.9~ 199.99 lq5.99 0 6 S I6,23 E 0.15 16~.6~ N ~- 672.86 E 161,.7] 29~.99 2~5.,99 ................ 0__.15 ......... S...~5.5~..W ........... 0,22 164~,qO..N _ 672,75 E 163"153 399.99 345.99 0 21 S 7.95 W 0.21 ........... 16q3,9~-N ....... 672-.55E ....... 161~0~ q99.99 q~5.99 0 10 S 29.q9 E o.2 16~3,51N 672.56 E 1613,7( 700 800 Zoo0 1100 1200 1500 1400 1500 1600 1700 18Oo 1~00 2000 2100 2200 219~,96 2500 2299.9~ 2~00 ......... 239~.9! 2500 2~9~.90 2600 . 2599.89 ........ ¢0.0 ........ 599.99 .. ........... 5~5.99 0 ........ 8 ...... 69~;99 .645,99 0 7 N 55, 6 E 79~.99 7q5.99 0 7 N N9.64 E 89~.99 8q5.99 ................ 0 ..... 11 ......... B_._50.59 E 99~..9a 9~5.98 0 50 S 86.19 E ~o9~.98 io45.98 o 12 s 70.86 E ___ 119~.97 ...... i145.97 .......... 0 ..... 2.9 .......... S...~O.9~_E 129¥.97 12~5.97 0 20 S 25.85 E 1599,97 15~5.97 0 1~ S 23.29 E 0 05 1643,51 N 672.71 E 1613 O,1G I643,28 N 672,88 E 1613.8~ O.Ol 164~;4-1 N 673,0~ E 1614-,0~ 0.06 1643,57 N ........... 675,24 E . 161~,32 0.71 16~.65 N 674.09 E 161~.9~ O.~q 1645.%2 N 675.25 E 1615.65 8~ 0.26 1642,95 N 675.97 E 1615. 0,~9 16~2.S7 N 676.~6 E 1615.7~ 0.10 16q1.92 N 676.56 E 1615,6~ 1~9~.97 ..... 1q~5..97 ........... 0 15 ........ S__.10.!8__U ........... 0..1~ ._ 1641.5I..N ............ 676,60 E ......... 1615.5; 159~.97 1545.97 0 8 N 69.6~ W 0.~0 16ql,3~ N 676.46 E 1615.1~ 1699.97 1645.97 0 10 S-75.28 W 0.09 16~1.5~ N 676.21E 1614.9] 1799.97 ..........17~5,.97 0__16 .... _S._~.8.~8_W ........ 0._19 .......16~I.IO._N ..... _675,_95.._~ _ 1614,62 1699.97 18q5.97 0 22 S 5.13 E 0,19 1640,58 N 675.86 E 161a 1~ 1999.96 1945,96 0 5 N 89.65 W 0,38 1640,26 N 675,81E 161 D~ 209~,96 ...... 20~5..96 0 1~ ........ ~ ..... 0.7~_W .............. 0,18 ......... 16qO,~O~N ...... ~75~,7.3_.E ........ 1615.9~ 2145,96 0 25 N 65.25 E 0.57 16q0.71N 676.05 E 1614.4~ 22~5.94 1 ~ N 55.59 E 1.15 16~1.69 N 677.~8 E 1616.12 ...... 2345.91 ........ 1 .... 1.6 ......... ~.__53..,19__~ ..........0,~0 .......... 16q3,.16_N 679.~6_E ....... 161~,~ 2q~5.90 0 ~ N 72.22 E 0.62 16~,02 N 680.96 E 1620.2~ · 2545.89 0 4~ N 76,58 E 0,05 1644,56 N 682,19 E 1621.~( 2700 ........ 26 .88 ....... 2645.,88 ................ .o__s7 66..4 [ ................ 0_,16 ....... ....... .......... 1622.4 2800 2799.85 27~5.85 1 49 N 79.51 E 1.22 16q5.23 N 685.36 E 162,.53 2900 2899.65 28q5.65 5 1~' N 51.89 E 3.72 16~8.5~ N 690.52 E 1650.1~ 3000 ...... 2998.83 .29~o_83 .......... 9_ _2~ ....... ~9,2~_E ............ ~.,1.1 .......... 1.656,_~__~ .......... ~0_,.25_E ....... 16~2.8~ 'ATLA[¢I!C RICHFIELD COi<PANY DF:iLL$1TE 9-9 CGhPUTAilOil DA~E PRUDHOE BAY DECENBER 9 1976 ALASKA DA5 E OF q'~ SUR~,~EL G'(ROSCC:,i~IC hbLTiSHGT dOB NUFBER SU3-1fi137 KELLY bUSHING ELEV, = 5q,O0 TRUE SUB-SEA COURSE COURSE DOG-LEG TOTAL MEASURED ....... VERTICAL ..... VERTICAL ...... INCLI~.ATION ..... DIRECTION ...... SEVERITy .... RECTA[~GULAR COORDINATES VERTICAl DEPTH DEPTH DEPTH DEG MiN DEGREES DEG/IO0 NORTH/SOUTH EAST/WEST SECTIO~ 310 52O 550 55O 57O 58O 400 410 4DO 440 450 0 ......... 5o9Z.o6 ....... ~o~3.o6 12 1~ 0 $19~.q2 ~140.~2 1~ 6 0 3291.09 ~237.09 15 3~ 0 ........ $~$7,03. .~3,0~ 17 10. _ 0 3481.13 5428,13 18 ~9 0 357b.0~ 3522.04 21 21 60.3~ E 1.89 1678.5q N 735.19 E 16&3.4t 64.31E 1,76 1690.58 N 757.86 .E 1708.0~ 68.,~1_E .............. 1,96 ............. 1701,64__.~ ..... 783,65.._.E ........ 173"~ 62 68.7~ g 1.65 1712,95 N 812.59 E 17c ~3' 70. 3 E 2.57 1725.01 N 8q~.55 E 1795,0l ,2~_N ............ 879,62_E ........ 1829,7; .11 N 91~,86 E 1866.9t 0 ......... 3668.74. ............ 5614,74 ............. 22 _42 ..... N._.._68,.7! E ............... 1. q. 3 ..... 17.38 0 37¢-,0.77 3706.77 23 25 N 60.24 E 3,39 1755 0 3851.29 379~.29 2~ 7 N 5~.55 E 2.39 1776;62 N 9~8.75 E 190~.5' O. ....... -'39~2,.78 .......... 3888,78 ..... 26 .... 13 .... N._55,21..E ................ 2,17 ......... '.1801,90._N .............. ~85,08._E ............19~8,T: 0 403!.63 ~977.6~ 28 23 N 53.52 E 2,17 1829,26 N lO19,BB E 1~94.3~ 0 ~118,33 4064,$$ 31 22 N 53.52 E 2.98 1858.67 N 1059.93 E 0 ........ ~202,39 ....... ~1q8.,39 .......... 34 ...... 12 ............ N.55,75._E ..................... 2,83 ..... 1890,97...N ...... 1103,53 E ......... 2097,5~ 0 q285,9~- q229,9~ 36 30 N 53,89 E 2,30 1925,11N 1150,22 E 2i55,0' 0 4363,30 4309.30 38 2~ N 5g. 5 E 1.93 1960,89 N 1199,~1E 2215,3; 0 ......4~3~,58 ......... ~$85,58 ............. ~2 ........ 7 ............ N..5~.14_E ........ 3,68 .......... 1998,79 N ......... 1251,76_E ............ 2279,5l 4700 4512.53 4458,53 4~ 11 N 54.49 E 2.08 2038.68 N 1307,31 E 2347.33 gSO0 g583,89 4529.89 4900 ........... 5000 ~726.82 ~672.82 ~ 1 N 5~,55 E O.3& 2~60.9~ N lq77.97 E · 5100 ~798,58 47,4.58 *~ 17 N 5~,50 E 0.26 2201.57 N 153~.69 E 5200 ........ 487q. 34 4816._34 4~ 0 N 5~.36_.E 0.29 .......22~1,8_8..N ..... :_~591~._$_4 E 5300 ~941.45 ~888.~5 ~3 ~2 N 5~.80 E 0.42 2282.03 N 1647.79 E 5~00 5014.70 ~60.70 ~$ 47 N 5~.69 E 0.11 2321.94 N 1704.25 E . 5500 ....... 50.8~,~_7, 50~2_,)7 ~3 40 N 5~,5.5_E 0,15 ......... 2361,_96_N 1760.61E 5600 515~.2~ 5105.23 43 47 N 5~.62 E 0.12 2402,02 N 1816.94 E 255~,~' 261 2693,5t 2762.2; 2630.7: 2967.7: 5700 . 5251.4~ '5177.4~ 5800 ..... 5303,66 52~9,.66 5~00 557b.95 5321,95 6000 5~8.2~ 559~.2~ 6~00 5520.37 5~6.37 43 46 N 5~.58 E 0,03 2442.09 N 1873.33 E 3036.2' 43 46 N 5~_5&_E ........... 0_..01 ....... 2~82,19 N __1929.&9 E 5104.8: ~3 36 lq 5~.47 E 0.14 2522.30 N '1985~95 E 3175.3' ~3 47 N 5~,49 E 0.15 2562,~4 N 20~2.19 E 32q1.8' ~3 53 N 5~.51E 0.10 2602.66 N . 2098.57 E 3310.4, D;iiLLSiTE 9~9 COF~?UTAT!ON DA'iE PR DHO~ BAY DECE~,'iBER 9 1976 ALASKA SU¢:;~,,~L GixOSCOPIC F, ULTZS~;OT .. dOB ~"~U['fiBER SUS-:",L6137 KELLY BUSHING ELEV. = 54.03 FT. TRUE SUB-SEA. COURSE COURSE DOG-LEG TOTAL MEASURED .............. VERTICAL ............. VERTICAL ..... INCLINATION .... DIRECTION ..... SEVERI'TY .... RECTANGULAR COORDINATES VE~<TICAL DEPTH DEPTH DEPTH DEG MIN DEGREES DEG/IO0 NORTH/SOUTH EAST/WEST ............ SECTION 6200 6300 6400 6500 6600 5592.45 ......... 5538,.45 ............ ~5 .... _53 ....... N_.5~,89 E ........... 0.26 .............. 2642,72..N ...........2155,15_ E .......... 3379,14 566~.6~ 5610,6~ ~3 ~2 N 55.26 E o.31 2682.3~ N 2211.88 E 3~4,~7.65 5736.96 5682.96 8~ 39 H 55.29 E 0,05 2721.67 N 2268.6ff E 3515.97 5807.37 .... 5755,37 ..... ~_~ ~.~ ...... N__55.5~_.. E ......... 0.19 ................ 2760.62 N 2525.~3 E ~58,, 19 588i.89 5827.89 ~ 28 N 56.1~ E 0.~2 2799.~9 N ....... 2582',~0-E .......... 365 )21 6700 5954.5~ 5900.54 6800 ........ 6.02~,i3_S.~73,13 6900 6099.58 60~5.58 7000 6172.14 6118.1q 71o_o ............ -62~..88 ..... 6!~o.8a 7200 6317,78 6263,78 7:500 6590.80 6336.80 7400 ....... 6~6~.,..08 ......... 6410.08 7500 6537.51 6483.51 7600 6611.11 6557.11 7700 ............ 6685,21 ..... 6631,21 7800 7900 0,1:5 2837.76 N 2~39.ff6 E 3720.03 0.26 ........2876,12. N ......... 2496.56._E ..... 3787.95 N 55.71 E 0.23 291~,78 N 2553.62 E 3656.02 N 55.91 E 0.21 2953,~5 N 2610.54 E 392~.01 N 56_,_ 6__._~ .............. 0.18 ...... 2991,85 N .......... 266~_,..~2_.E ..... ~991,76 N 55.89 E 0.15 5030.14 N 2724,15 E q059,~6 N 56, 9 E 0,16 3068.:56 N 2780.79 E N 55,~9E ...............0,57 ........:5106.~1 N 2837,19 E N 56, 0 E 0.12 :5~,43 N 289:5.~ E ~2~1,07 N 55.56 E 0.~8 :5782.50 N 29~9.41E ~327,95 N 55.56._E ........... 0.48. 3220,57 N ....... 3004.72 E ................... N 55.25 E 0,47 ~258.79 N 3059.95 E ~60.79 N 55. 9 E 0.31 :5297.20 N ~115.1~ E ~527.~5 675~,31 6705.31 683~.31 6779.31 42 25 ~2 7 8000 ....... 6907__,36 6853,36 8100 6981.37 6927.37 8200 7055.~4 7001.44 8:500 ...... 7125,67._ 7075,67__ 8400 7204.36 7150.36 8500 7275.36 7225.36 ........ 8600 ........... 7:55~.57 7300,57 8700 7~30.16 7:576.16 . 8800 7506.19 7452.19 ..... 8~00 ........ 7582.57 7528,57 9000 765~.39 7605.39 9100 7736.87 7682.87 .............. ~200 ....... 781~,_05 7761,05 42 20 N 5~.94 E 42 12 N 54.81E q2 13 N 54.70 E ~1 55 N 54.76 E ~! 27 N 55.19 E 41 22 N 55,50 E ~1 5 N 55.57 E 40 42 20 _ 59 3q. 38 52 38 16 0.23 .......... 3335,74_N_ 317_0.20_~ ____~593.89 0.15 3374,~3 N 3225.21E 4660,50 0.07 3413.20 N ~280.08 E 472 .~6 0.54 5~90.06 N 3389.24 E 4859,28 0.22 :5527,67 N 54~$.65 E 4924.71 0.28 ....... 356.4.,96_N ~7-_PS__E .... ~98~.B6 55,46 E 0.39 3602.03 N :5551.94 E 55,35 E 0.37 5658.91N :5605.42 E 55,63._E__ ..........0.33 ....... 3675.~8__N ..... ~65~,60 E 55.88 E 0.~0 s71i.50 N s71i.52 E 56.15 E 0.72 37~6.85 N 3763.94 E 56. ! E o.~o ....~78i.6~___N ..... ~8i5_,67 E 5054.59 5118.85 5152.66 5245.92 5308,55 5;59.9o PRUDHOE BAY ~C~n~R 9 1~76 ALASKA dOB ¢iUiiL~E?, SU5-!6137 KELLY [¢USHING ELEV. = TRUE SUB-SEA COURSE COURSE MEASURED VERTICAL ....... VERTICAL ..... INCLINATION ....... DIRECTION DEPTH DEPTH DEPTH BEG MIN DEGREES DOG-LEG TOTAL SEVERITY RECTANGULAR ..... CO0.RDINATES VERTICAL BEG/ZOO NORTH/SOUTH EAST/WEST SECTION 9300 9400 9500 9600 9700 9800 10780 10800 7894,00 ......... 7840.00 ........... 57 7973,44 7919,4~ 37 20 N 55,8 605~.08 7999.08 37 5 N 55,7 8135,06 ............ 8079,06 '36 42 N 55.8 62Z5,60 8159.60 56 0 N 55°4 82&b. IO 8241.10 34 q9 N 55.5 9900 ...........8~77,~ ....... 8~23,75 ............ }a ......... ~2 N 56. 10000 8461,39 8~07.39 32 q5 N 56, 10100 85~6.0~ 8~92,04 31 35 N 57. 10200 ........ 86~i,61 ............ 8577,61 ............... 30_ ..... ~5 ............ N._58. lOSO0 8717.69 8663.69 50 25 a 58. 10400 880q. OO 8750.00 30 15 N 58. 10500 .......... 889U,.69 ....... 8~6,69 ............ 29 10600 8977,53 8923.53 29 55 N 59. 10700 9064.57 9010.57 913q.89 9080,89 ~7 55 N 60. 9152.56 9098,56 27- 56 N 60, 9._E .................. 0 .., 8o ...... 3816,00 N .......... ~866,5.,'3.._E ................ 5q-.:.'50.52 0 E 0.14 3650,10 N :5916.79 E 5490.52_ 2 E 0,25 388q,.13 N ,.396&.78 E 5550.27 0 E ................... 0.38 ...... 3917,90 N 4016,ql E 560" 59 9 E 0 72. 3951 35 N ~o65.3~. E 566... 8 E 1._.1.8 ;598q..Zq. N qllS.ZZ E 5725.q. 6 ,31 E .......... 1:18 ..... q. 015,66 N ...... 41.59:Tq-_E ...... 578,1,05 87 E 0.99 q. 045.85 N q-285.q. 8 E 58,35,06 q, 5 E 1.20 q. O74..'TZ N q'250.20 E 5887.q-5 27__E ............ 0.95 ....... q. lO2,2q- N __. q'294:02 E . ..... 5958,26 68 E 0.39 ~128.8~ I,d 4337.39 E 5988.11 "0 N 4380 5~ E 60,37.55 68 E O.l& ~155. -. . 12_.E .................. 0.73 q-180,85 N ffq-23.21 E 6086.3;> 1~+ E 0.~6 4206.29 N L~65.78 E 2~ E 1.01 ~251.14 N 4508.26 E 6182.79 89. E ...... Z.~7_ ~2~9,89 N ..... ~5~1.~9 E .............. 6219,86 89 E 0,08 ~254,u~5 N ~5~9,&7 E 6228,95 ........ HOR I Z ON TAL___ O I SPLA C .... 6228. ~_5 ..... FEET_AT__ .NOR TH,__:N.& DEG. .... 55_MIN, EAST._AT_.___Mq :=_10800 THE CALCULATION PROCEDURES ARE BASED ON THE USE OF THREE DIMENSIONAL RADIUS OF CURVATURE HETHOD. , P[~UDHOE GAY DECE~':,BER 9 1976 dO~; ._L~ L;E[~ SUZ-~SI57 ALASKA K. ELLT CUSiiI~b ELEV, - ~,.OO FT, ALASKA KELLY ~u'sHIf?G-EI~E~;~ ~ -= ........ -~4.0'0 FT. INTERPOLATED VALUES FOR EVEN 1000 FEET OF MEASURED DEPTH ................ TRUE ............. SUB.~SEA ................................... TOTAL MEASURED VERIICAL VERTICAL. RECTANGULAR COORDINATES ND-TVD DEPTH DEPTH DEPTH NORTH/SOUTH EAST/~EGT DIFFERENCE U~RTICAL CORRECTION 1000 9~9.98 9g5.98 2000 199.~,96 ........... !9~5,96 3000 2998.85 29~4.8~ ~000 ~942,78 ~888,78 6000 54~8,2~ 559~.2q 7000 6172.1~ 6118.1~ 8000 ........6907,~6 ......... 685~_,~6 9000 765~.~9 7605.~9 164~,65 N 67~.09 E 0,01 16~0.26_N ....... 675...81.~_~ ............... 0,.0~ ..... 1656.qN N 700.25 E 1.16 Z~01.90 N 9~.0~ E 57.21 2160.9~_..~ ........ 1~77,97.E ............ 27~.17 2562.4~ N 20~2.19 E 551.75 295~.45 N e~Z0.54 E ~3~5.?~ N 3170.20 E 10~2.65 57t1.50 N ~7t1.52 E 15~o.6o loooo 6q61.39 8~07.39 40~,5.~5 N ~205.48 E 15~8.60 101100 ....... 9!.52._~.6 ?0_9_8,56 ............... ~2_54_.~5 _N __ _4.5.99,67_E_ . 16~7.45. 0,01 ..... 0._.02 56,04 ..... 215,95 278,58 276,10 2G~.77 2~7,97 197,99 108,8~ THE CALCULATION PROCEDURES ARE BASED ON THE USE OF THREE DIMENSIONAL RADIUS OF CURVATURE METHOD, _ _ ~.CE~., 9 1976 P~qUD HO~- bAY ALASKA INTEEPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH TRUE SUB-SEA TOTAL ~,iEASURED VERTICAL VERTICAL RECTANGULAR COORDINATES HD-TVD VERTICAL DEPTH ...................... OEP.TH ......................... _DEPTH ................. _N0iiTH/$0U.~lt ............. EAST,'_WEST .... DIFFERENCE ....... _CORREC T..!_0N 0 0,00 -54.00 ..1645,00 N 67S, 5~ ................... 5~,00 .................. 0,00 ................ 16~4,9~.N ................ 672. 154 154,00 100,00 16~.72 N 672. 25~ 25~,00 200.00 16~.5~ N 672. 55~ ................. 55~,00 ............. 500,.00 ..................... 16~,21_._N .............. 672, ~5~ ~5~.oo ~oo.oo ~6~.6~ N 672. 55~ 554.00 500.00 ~643.5B N 672. &5~ .......... 65~,00 .............. 600,.00 .......... 16~,2~_N .......... 672, 75~ 754,00 700.00 16~3,3~ N 672, 85% 85~.00 600.00 ~645,~8 N 67~. 95~ ............... 959,00 .......... 900,00 ........ 16~3,&6_N ............ 67~, 105~ 105~.00 1000.00 16q5,56 N 67~. 115~ 115~.00 1!00.00 16~,2~ N 675. 125~ 125~.00 1200.00 1642,62 N 676, 155q 1~5~.00 I~00,00 1&~2,09 N 676. 1~5~ lq5%.00 lq00.00 16~1,7~ N 165~ 165~.00 1600,00 16~1,$7 N 175~ 175~.00 1700,00 16~1,28 N OD E o.oo - ~a__.E ......................... 0.o0 ....................... O.oo 8~ E o.oo o.oo B6 E o.oo o. 57...E ................... 0,00 .............................. 50 E 0.00 O. 64 E 0.00 ' O, 80 E ...............0,00 ......................... O, 97 E 0.00 O, 13 E 0,00 O. 46..E ..............0,00 .................. O, 83 E 0,01 O, 70 E 0.02 O, O0 O0 O0 O0 O0 00 .................. :_ ...... O0 O0 25 E 0.02 0.00 48 E 0,02 0,00 676,63 E 0.02 0.00 676.55 E 0.02 0,00 676.35 E 0,o2 o.00 67&,06 E 0,02 0.00 INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH · TRUE SUB-SEA TOTAL ~qEASURED VERTICAL VERTICAL R~CTANGULAR COORDINATES fqg-Tvg VERTICAL DEPTH ................... DEPTH_ ...................... DEPTH_ ............ NOR TH/_....SOUT_I-J ............ EAST/_.WEST .......... DIFFERENCE .......... CORRECT.!_ON ...................................... 185~ 185q..00 1800.00 1640,86 N 675.85 195~ .............. 195~,.00 ........... 1900.,00 .............16qO.28._..N ............... 675.87 205~ 205~.00 2000,00 1640,28 N 675,7~ 215~ 215~,00 2100,00 16~0,56 N 675,77 225~ ....... 225~,00 ............. 2200,00 ..............16~0,98_.N ..................... 676,5.1 255~ 235~,00 2300.00 16q2.55 N 678.6~ 2~5~ 2~5~.o0 2~00.00 16~.aS N 68o.58 255N ........... '255~..00 .............. 2500,00 .............. 16q~,22.._N ................. 681.62 2656 265~.00 2600.00 16N~.5~ N 662.85 275~ 275..00 2700.00 16~q.97 N 683.99 285~ ........ 285~.00 ............ 2800.00 ............. 1646.$.1__.N .......... 687.66 2~5~ 295~.00 2~00.00 165~,1~ N 695,2~ 3056 305~,00 3000,00 1662,~1 N 708,09 3158 3154,00 3100,00 1673,53 N 726,~9 ~261 ~25~,00 ~200,00 16~5.91 N 7q8,55 5565 335~,00 5~00,00 1697,87 N 77~.17 5~7o ........ s45ff, o_o ...... ~4oo...o_q .............. z7o9.47 $576 555q'.00 ,5500.00 36a~ 365~ .00 3600.00 E 0,02 0.00 E ............... 0.03 ................... 0.00 ) ....... E 0.03 0.00 E 0.06 0.00 E ..................... 0.03 ............................. 0..00 ..................................... E 0.07 0,03 E 0.09 ' 0,02 .E ........ .0,10 ............................. 0.._00 ...................................... E 0.11 0.00 E 0.12 0.00 E 0.20 0.08 E 0.68 0.47 E 2.0~ 1.36 E ~.32 2.27 E 7.50 3.17 ~ 11.42 3.92 803.~6 E 16.27 ~.85 836.58 E 22,38 6,10 873,87 E 30.02 7.63 ) 1722.10 N 1736.00 N ALASKA dO;,?, i:!U~';;':.'F~ SUS-!6iSY KE''" '" - 5'., CO FT. LU.~ ~,;USHI['JG ELEVo - · HEAS DEPT INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH TRUE SUB-SEA TOTAL UrgED VERTICAL VERTICAL RECTANGULAR COORDINATES F1D-TVD H ............................... OE~TH_ ........ D E P_T...H_ ........ NORT_H/S..OU_TH ....... EAST/WEST ...... DIFFE_RENCE .... VERTICAL COP,.RECT_~ON ................... ; 3792 3901 4012 4125 4242 _ 4562 4~88 4757 4898 5037 .. 5177 5315 5454 5592 5731 5869 6007 6146 5754,00 5700,00 1755,70 N 912 .... 385~.,.00 ......... 5800,00 ........... i.,..~777_._26~ N ............... 949 395q..00 3900,00 1805.21 N 987 405~,00 4000,00 1836.57 N 1029 415~,00 ............ ~100.00 ............ 1872,09__N ......... 1_077 425~.00 4200.00 1912.06 N 1152 4554.00 4~00.00 1~56.55 N 119~.43 E 1~4.12 - 25 ......... ~5~,00 .......... ~400.,00 .............2006.,43__N ..........1262,33 .E .......... 165.,_43 ............. 51 ~55~,00 4500,00 2062.19 N 13~0,19 E 205,91 38 ~65~.00 ~GO0.O0 2119.83 N 1420.29 E 24.4.40 40 __ 475~,00 ............ JTO0,O0 ............. 2176,17 N ........ 1499.~5 E ........... 283,76 __ 39 q85~,00 ~600,00 RR32,69 ~ 1578,51E 323,~8 39 ~95~,00 4900,00 R288,~9 N 1656,60 ~ 361,96 38 .30 E 58.62 8.59 ,37. E .................... ~?.86 9.2~ .51E 58.49 ' ....... i0.63 ,78 E 71,52 13.02 ,84_.E ........................... 88,0.4 .............. 16.~.5.1 ................................ .32 E 108,7~ 20.70 .37 .~8 .37 .68 .......... 505~,0.0 .......... 5000,_qB .............. 2~4~,71 ..~ ............. 173~.796 E ............ 400..~1 ............ 515~.00 5100.00 2399.11 N 1812.84 E 438.74 38.33 5254.00 5200.00 2454,61 N 1890,9~ E 477.23 38.48 ....... 535~.oo ........... 51_oo.,.oo 2510_~.1.3 N 1~68,91...E ................ 515..66 ................. 5~5~.00 5~00.00 2565.65 N 2046.68 E 553,97 5554.00 5500,00 2621.42 N 2124~91 E 592,64 38,67 ATLANTIC RICHFIELD DRILL$ITE 9~9_ PRUDHOE BAY ALASKA COiqPA?JY SRERB_Y- SU.N.._._WELL _SURVEY I NG_C OMP AN_¥ ANCHORAGE, ALASKA CO~?UTA T I ON_.DA TE DECEMBER 9 1976 P_AGE ...." DATE OF SURVEY DECEPiBER 7 1976 SURWEL._~YROS~.OP_IC ~.!.ULTISHOT SURV~- ,JOB NUHBER SU3-1G137 KELLY BUSHING ELEV,'= 54,00 FT INTERPO TRUE SU MEASURED VERTICAL VER DEPTH ..................... DE'IH ......... O 6285 5654,00 560 642~ .... 575~.:_00 ...... 570 6561 585~,00 5S0 6699 5954.00 590 6837 ........... 60_5~_, O0 ........ 600 6975 6154,00 610 7112 625% O0 o20 7249 .......... 635~.00 ...... 65 7386 6454.00 64 7522 655~.00 65 7658 ...... 665g,00 6G 7792 6754.00 67 7927 685q,00 65 8063 695~.00 69 8198 705~.00 70 8~32 7154.00 7! 8466 ...... 725~,00 ..... 72 8599 735~,00 73 8731 7~5~,00 7~ LATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH B-SEA .TOTAL TICAL RECTANGULAR COORDINATES MD-TVD E P_! ~ .N OR T_H/_S.O U_T._H ..... E A S?/.W ES I ......... O I FFERENCE VERTICAL C 0 .~ R .E C _T_I_ O..N 0.00 2676,54 N 2203,53 E 631,28 O,O.O ............. 2T30._?_.93_N ........2282,00 E 0,00 278~,76 N 2360,~5 E 707,56 0,00 2837,47 N 2439,03 E 7~5,2~ 0,00 ................. 2~90,~0 N .......... 2517,77_.._E ................ 783,08__ 0.00 29~3.8g N 2596.5~ E 821.05 0.00 2996.62 N 267~,53 E 858.50 00,00 ......... ~oNg,16.__N ..........2752.26 E ............ 895,65 00.00 5101.19 N 2829.~9 E 932.27 00,00 3152,96 N 2906.08 E 968.46 00,00 520~.62 N 2981.63 E 1004,01 00.00 3256,02 N 3055.94 E 1038,79 00.00 5307.91N 31~0.~8 E 1073.88 00..00 ............ 5560_,1~ .N ........ 3204.9~ E ........ 1109.05 00,00 3~12,45 N 3279,01E 11~4.05 00,00 3~6~.49 N 5352.62 E 1'178.68 O0,OO ............. 3515,02_N .... 3425, 00,00 3564.68 N 5497. 00.00 561~,65 M 5568, 38.63 38,25 38,02 37.67 37,84 37.94 37,q7 37,~2 36.64 56.18 35,55 34.77 35,08 35.17 ................... 35. DO ....................................... . 34.63 2~_E ............. 12Z2;20 .................. 33.52 ............................. 57 E 12~5.23 33,03 82 E 1277,~5 32,~9 ATLANTIC DRILLStTE..gr9 PRUDHOE BAY ALASKA RICHFIELD COMPANY SP_E_R..R.¥--_S__U~.!_WEL..L. _SU_RV_'E% i NG _C_O!~?._A. NY ANCHORAGE, ALASKA PAGE DATE OF SURVEY DECEMBER 7 1976 COMPUTATION OATE SURWEL GYROSCOPIC MULTISHOT SURVEY DECEMBER 9 1976 dOB NUMBER SU3-16137 KELLY BUSHING ELEV. = 54.00 FT. INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH TRUE SUB-SEA TOTAL MEASURED VERTICAL VERTICAL RECTANGULAR COORDINAT DEPTH ........... DE_P.?H .................... OEPT_H .............. NO. R.T_H/$ P U_T..H, .__E_A S_ T/WE ES MD-TVD VERTICAL ST ....... DIFFERENCE ........ C_ORRECTI.ON 8882 7554. 8992 ............ 765~, 9121 7754. 92~9 785S. 9375 795~, 9501 805~. 6~ 9 ~6 815~. 974~ 825~, 9871 835~. 9991 845~, O0 7500.00 3661,91 N 3638 O0 ............ 7600,00 ............. ~709.00 N ............. 37_07 O0 7700.00 5754.53 N 3775 O0 7800.00 3798.76 N 3841 O0 .......... 7900,00 ................ ~8~1,77.._N ..... 3904 O0 8000,00 ~84,5i N ~967 O0 8!00.00 3925,G7 N 4029 O0 8200,00 3967.90 N 4089 O0 8500.00 ~006.88 N 4146 O0 8400.00 ~0~.2~ N 4201 10109 855~.00 8500.00 ~077,5~ N 4254 10z 6 ..... 65 .00 ........... 8600,00 .............. .......4 o5 10~2 8754.00 8700.00 ~159.92 FI 4555 10457 8854.00 8800.00 4170,16 N ~405 10572 '895~.00-~'8900.00 N199.35 N 4454 106~7'~. 10800 .77 ,85 .~+1 ,07 ,53 .$2 .56 .32 ,35' .59 .35 · .16 E 1508,66 31.25 E 1367.99 28.99 E 1395.5~ 27.54 E ................. 1421,54 ........... '_ ....=26,00 .......................................... E I4~7.14 25,59 E E E E E E E E E 1~72.11 24.96 ...... 1495.86 1517.~5 ................... 21~'~ ................. 1557.20 19,7q 1555.33 18.13 1572.05 16,71 1588,09 16.04- 1603,80 15.71 1618,85 15,0~ 9054.00 ~000.00 4228,22 N ~505.16 E 16'55.89 15.0~ e152-,.56 ....... 9098:56 ............... ~25~,~5_N ....... 454_9 ?67 E ..... !6~7,43 ............... 1_3_:_53 Tt-!£ CALCULATION PROCEDUF:£S USE A LINEAR INTERPOLATION BETWEEN T,-iE NEAREST 20 FOOT ;"iD (FROM RAOIUS OF CURVATURE) POINTS )-- ) L ATLANTIC RICHFIELO ORILLSITE 9-9 PRUDHOE 6AY ALASKA COHPA~Y SPE.gB~SU~__~ELL__S~RVE%ING_.C_0HPANY PAGE ANCHORAGE, ALASKA DATE OF SURVEY DECE~6ER 7 197G C O~iRUTA TI.ON .DA TE .............................. ~UR.~EL... G ¥ ~.osc.o~IC_~I_~.~T~ DECEr~BER 9 1976 dOB NUFi[]ER SUS-[G[37 KELLY BUSHING ELEV. =' 54.00 FT. INTERPOLATED VALUES FOR SPECIAL SURVEY POINTS TRUE SUB-SEA TOTAL MEASURED VERTICAL VERTICAL RECTANGULAR COORDINATES DEPTH ........... DEPTH ..................... DEPTH ....... NO~TH/SOUTH E.AST~.WES? .......... MARKER 1065~ 878~,.7~ 8732.73 4i49.86 N 4371.92 E TOP SADLEROCHIT 900~_. O0 .......... 6.953, OO ............. ~2.!_~9_~_. N ........ ~_NSO.,.3~__._E ............... BASE__SADLEROCHIT ! I ' E~$t~~~n / "~ ~.~hipstock A PETROLANE ~PANY REPORT D ~EC Ti O~f R L ~~?VEY Atlantic Richfield COMPANY D. S. 9-9 WELL NAME Prudhoe LOCATION JOB NUMBER ~177 G0249 TYPE OF SURVEY Gyroscopic DATE SURVEY BY Jay Martin OFFICE Alaska -AT'CA U T'I'C--R-~'-C H #"f Ei~-D--CO-,--~//~' D R-I"L'~--S- I-T"~--9'"9'-' -G~'R'ds'coP-fC--$-OR'VE-¥ ........................ ,~~~ ~ D~C'CiN-A-fi'O'N---~f-~--~'R'IS-E-~ EA,ST -RAD-I'US-O~--'CUR'V-A-T-OR-E--M'E-YHO-D-'O'F--C'OMPUT-A-¥-I-ON-$ ~ K B" 'EL'E'V-; 5 4' RECORD OF SURVEY ALL C-A'I~-C-O'L-A-T-I-O'N'S--P-ER'FO R M E D-'B'Y--J--B-M-E-L-E-~¥RO'N-I-C-C~OM pu T E R TR-UE MEAS. DRIFT VERTICAL SUB DRIFT TOTAL~ COORDINATES -D'E~T-H'-A'b~'G'CE ...... D-E'P-T H--S'E-A DJ'RE C D M DEG. CLOSURES D I STANCE ANG i,,, E DOG LEG SEVERITY DEG/ILOOFT sECT DISTAr~¢E 0 0 0--'0-. 00-- -5/+ . 00 $'2'Oi-~'O'E ......... 1-6-/+-51-0'0-N--6-7-3-,-0'0 E 1:7-7'7.3/+ N 22 ~5 1 E --z 33 o o ~' E 233 0 5__232.99__1,78.99 S20.OOE 16/+/+.92 N 6-73-';02-' E- 0,000 0,000 0.090 673.03 E 1777.02 N 22 15 21 E 0.~60 332e99 278.99 $15.00W 164&.63 'N --~33 0 15 432"'99--37'~,-99~-$ 1-'00W---~6'4:4','20 N 672.97 E 1776.59 N 22 15 34 E 0,061 ..--,-5_3~. 0.._2_5__~%2~9..9 ...... ., ~8~ . S.l~tgOW 1643,6~ N__6'7-f~92--E fgJ-6'~O-3--N-2-2--~5----~3--E--O. 180 633 0 10 632.99 578,99 S36.00W 1643.13 N 672,71 E 1775,51 N 22 15 53 E 0.260 733 0 10 732,99 678.99 525.00W 1642.88N 672.56 E 1775e21 N 22 15 48 E 0.033 159~.7/+ 1594.7/+ 159~.~2 15~3"76 .... 1593.29 833 0 5 832,99 778,99 S 5.00E 16/+2,65 N 672.53 E 1775.00 N 22 15 53 E 0,080 1592.83 --933 0 5--932,99--878,99 Si6eOOE 16/+2.50 N--672,55 E 177/+,86 N 2-2---1-6 3 E O-e-O-z-7 1592-,'Y5-- 1033 0 10 1032.99 978.99 586'O_OE___l_6~.2_.37_N ..... 672..72_E- l_7_77_,_80_N__2_2_l_6_._27_E 1133 0 5 1132.99 1078.99 N21.OOW 16/+2.52 N 672.83 E 177/+.99 N 22 16 32 E 0.080 1592.97 1233 0 5 1232.99 1178.99 N16.00E 1642.67 1333 0 I0 1-3-3-2-.-99 1278,99 N86.00W 16/+2,8/+ N 1/+33 0 I0 1/+32.99 1378,99 S16,00W 1642,68 N 672,71 E 1775,23 N 22 16 5 E 0.080 672,~9 E 1775,00 N 22 15 ~8 E 0,21~ 1593.-~ 1592e82 .__1_5_3_3 ..... 0__._~_5 !_53.2..__99 1/+78,99 S28.00E 1642e32 N__ 672.52 E 177/+.69 N 22 16 8 E 0.080 1592.61 -- 1633 0 15 1632.99 1578.99 S 1.,OOW 16/+1e90 N 672,63 1733 O, 10 1732.99 1678e99 $19,00W 16/+leS~+ N 672,56 3,833 0 15 18-3-2-Jg'9----L-7-7-SV99 531,00W :L 64,1 · 2-1-N ...... 672./+~ 177/+,3/+ N 22 16 37 E 1773.98 N 22 16 ~+6 E 1773,62 N 22 16 /+4 E 0,125 0.080 1592.12 OEO80 1591e79' 1933 0 15 1932.98 1878,98 S29,00W 16/+0.83 N 672,19 E 1773,18 N 22 16 37 E 0,009 1591,37 __2_0_33 0.15 293_2,98 1978,98 N16,00W 16/+0.87 2133 0 10 2132.98 2078,98 NSO,OOE 16/+1e15 671.85 E 1773,09 N 22 15 59 E 0.462 1591,15 672.02 E 1773e/+1 N 22 16 6 E 0.080 _..._2~33 1 0 2232.98 2178.98 N20,OOE 16/+1,78 N__ 2333 1 15 2332.96 2278.96 N49.00E 16/+3.38 N 672,77 E 673.87 E 177~.27 N 22 16 58 E 1776.17 N 22 0,830 1592./+3 0.2 50-- 15-94' 32--- --0.087 2433 1 10 2/+32.93 2378.93 N33.00W 1645.29 N 67/+.14 E 1778,05 N 22 16 51 E RECORD OF SURVEY ALL CALCULATIONS PERFORHED BY I B M ELECTRONIC COMPUTER TRUE _HEA~_~_ _DR_I_F_TV_E_R.~.!..C. AL .......$ U B ....... D R]:F ~ _~_EP_TH..__A N G_L_E DE_,P_T_H .......SEA ........ D_!REC D NI DEG. TOTAL COORDINATES C_U_.o_s_u_~_:E_s ......... SEV_ER z TY DI STANCE ANGLE D M S D EG/_!00 F T D!S_TAN~..E_ 2633 o zo 26_3._2_,22..~__;~_57.8~,_9.2.N?_!_,.o. oE ...... 1.6/+_7.,_23 N__674,_7_8_E ....... 1_7_80,08 N 22 16 35 E 0.,~_5.0 _._2..7~__0.~5__2.?,~2...9 2. 2.678_...92~N8.9..-0 0 E 16 47_.._32_N ..... 67_5,2.9 E 1780_,36._N_2"_2_17 2_5_E 0.09 2883 ~ 30 288.~9. _?_82.~.80 .... B~.3_,.O.OE~~ge87 N 679,~6 E [7_8..~)_3.0_N_2.Z_Z2_5~_E ~)~62 2933 6 30 29~_Z.._572_878.~_57 .... N49.. 25E.!653.!8_N~_6.82,.,91_E !78.8....68_N_2~__26_42 E _4..-.003_ 2983 8 25 2982_,.~_. ~928._.~4 ...... N.51,OOE ~6_57_.3_5 N 687_._90_E _~9.~_~4_N_Z2_32_28_E . 3~86.1 _~0.~~_._4.5 .... 3.0.8_0.~?__3.026_,~9 ..... N.5.3....50E__% 66 8.._8~_N 7.01_._78 E__--.!.810_.3.8._N_22__68_2_8 .... E .. _2_. 199 ~_Z~.._Z~.2__5.5_~3_~..29_.,~_4..3075_._34 N54_..O.OE' ~6.75._!~N 7_!~,~.0 E~!8!9_e~5_.N_22 58_5! E __~._36.~~ 3~83 13 2Q 3178,03 3z2.~)_O~___~N.~.e~_o.Q.E _ Z.6.8J_,~9 N 719,81 E ~829,09 N 23 ZO 29 E__0,92 3 3 3 3 15 2 o 3 3 2 3.13 3_%e?_,._-'L3__NAg~_O._O.E. ...... 17..o.0_._57 ___3_3_8_3__~..6 3_0 ...... 3_3.._7_1_;_2._1___33!_7_._21 .... N63_,_0.0 E___!706_.90__N . 3..4~.~. 1_7__30___3.4_~__9_,_0_3__3_3 65_, 03__N 63 · ? 5 E 173.3,45 3483 18 55 3466,52 3412,52 N63,00E 1720,/+6 3533 19 55 35~3,67 3459,67 N62,00E 1728,14 ........... 741,24 E ~8~9,2~ N 23 37 50 E 0,663 1678,43 752,66 E 1859,69 N 23 52 26 E 0,765 1691.22 76/+,82 E 1870,42 N 2/+ 8 10 E 2,326 170/+,52 77"7-':-89 E 1881,76 N 2/+ 25 3 E--2,005 1718,64 791,86 E 806.62 E _~5~__29_~5 _3~6~0~____3506.,_53 N62.,_OOE ....... 173_6.,.33__N .... 822,03 E 3633 22 0 3607, O~ 3~_,_0.6 .... N.6~,~ E 1745 · 06_N__8~_Q3~_O__E__.__. 3683 22 45 3653,29 3599,29 N62,SOE 175~,07 N 85~,87 E 3733 2~ 55 3699,37 3645,37 N57,75E 1763,73 N 87!,69 E 1893,9/+ N 2/+ /+2 53 E 2.864 1907,11 N 25 1 16 E 2.013 1921,09 N 25 20 3 E 2.000 i951,30 N 25 58 58 E 2,158 1,566 1733.75 1766._85__ 1!8~_:67_ 1803.19 1967.39 N 26 18 0 E 1822.19 3783 23 10 3745,38 3691.38 N58,00E 177~,1/+ N__888,27 E__198/+,09 N 26 35 46 E__0,486 ,, ~8~,_5.1_ _ 3_8~3_23___2_O___3791._,_32__373.~,_32.___N58,00E 1784,60 N 905,02 E 2000,97 N 26 53 26 E__ 3883 23 45 3837,16 3783,16 N58,00E 1795,19 N 921,95 E 2018,09 N 27 11 1 E 3g'3'3--2~ .... 0 3'8'Sf'-~O--38'28-,-70---N58-e-OoE---~-8-O-6-,12 N~93~.~5--E-'----2'O~'~e'8~--N-2-7-'28 52-E 3983 27 lO 3927,60 3873,60 N57,50E 1817,85 N 958,05 E 2054,86 N 27 47 24 E 0,340 1860.97 0,820 1880,67 2'. 50 o '1'9 o 1-.-o2- 4,345 1922,72 OEO00 19/+5,26 1,843 19.68,17 RECORD OF SURVEY --ALL CALCULATXONS ELECTRON]:C CONPUTER J'4 EA_S,_DR J.FT_V[ RT_XCAL ,SUB .......... DR ! FT DEPTH ANGLE DEPTH SEA DIREC TOTAL COORDINATES __D_I_$.T_ANC E .................. ANGLE .......... D E.G/_I~O_F_T . D N $ _4,1.33_29__~..0 .... _40.60,.20 ~006,20 ....... N57, OOE .... !855..,..70_N___! 0.]...!~06 E 2.~16.,.$ 3 ...... N...2 e_.....~3 ....... 33,_~ ........ 2,8 23 ~23.3 ..... 32 ....... 0 ...... ~1~6,02 ~092,.02 ......... N56,.50E .... 1883_,55 N !..06~.~5_E~2161_,.~1 N_29 _._4283_33_30___~!88,07__.~134,07 .......... N57.,OOE,~.89..8.,38 .... N~_l..O. 82_,_7~_E 2.185..,.~6.__N..29_~1 ..... 56._E~ 7339.15 o 22 .,o NS .oo[ N E 2 O.SO N 30 0 E 3.O O _~.~__33._~.~.30_.~..31.0.9~ .... ~ 25 6, 0 ~ ~ 5,~.,o,o,E !.9..~6,~3 ~_N__~.,z 5_5)~6 ? E ~ 2263_,,5 9_N._3 0._~2 ~~.8~_~ ..... ~.~_9..,_5_! ::: ~.~9.%,.5.i__NS.6~_O.OE !_gA3_~5.~_N i_l.8j_,_i~_[ 2.2.9_1).3.8_N_3.~ 1 ~2 E l, 500 ~.533~.0_!.0 ~.388.,.~25~33~._,25 N57.,5OE__1980_e8~_N_~Z_~O_7_,_55 E 23.!9.,.89 N 31 22 2 E ~,038 ~583._~[ .... 50 ~.~25.,p.8~37[,98 ........ N55,00E ..... !999.~.06 N .... 1235_,_8~E 23~.9,69 N_3[~.2 [3 E ~,013~ ~6_3.~_~.3_.[.O~_6.2_~.87.~5.0_8_,_8~N55_,O.OE ...... 2.O.[.8_,~.~_N~[_2.6.23._5_O~,E ~ 2380,76 N 32 [ 31 E 2,660 __? 683~~2.5 ~ ~.~98_, 93_~~., 93 ...... N 56, 00 E_~20.3B., 0.~_N~!29_[)_02_E ...... 2_~! 2,5 ~_. N._.32 ~783 ~ ~5~569,99 ~5[.5_,.99. N55,00E~ 20.7_8.,_[?~ [_3~_~,_8p_E~47.7_,.50 N 32 59 8 E ~8.~_3. ~..~ 50 ~..6_0_5_,_~ ~551.,.~7___N5~".~00E 2098,60 N [377,5Z E Z5~0,3[ N 33 ~883_?~_30 ~6~[,03 ~587,03 ...... N55,50E 2~.!8..,.89_N ....[_~0.6.,_21 E~25~3,05 N 33 3~ [3 E~[,623 ~933 ~& 20 ~676,7~ ~622,7~ NS~eOOE 2[39,08 N [~3~,79 E 2575,7[ N 33 2250,0~ 23!_~.'95__ 2352,81 2387,81 2~22.8~ 2 ~ 2/+92.56 2608.4~+ N 34 7 33'E 2641,18 N 34 24 13 E 2674,05 N 3~ 40 30 E 0 e,500 25(32.,.20_ __0 · 0 0 0__25 9_7_.~.~_. __5.1_33__~.~.__~0 . ~.8!_9,_l.3__~765,].3__N55,_OoE___2_Z!_9_e_!3_N :1_550_,_1_8_E____ ....... 5183 _ ~.z~_._~ 5__~.85 ~,.,_72 4800,72 .... N55,50E__2 239.,!_5_N 1579,04 __~.2~ 3._~.~__30 /+8_90 · 30 z+836,30 N55,00E 2259,17 N 1607,90 2706.96 N 3~+ 56 10 E 2739,92 N 35 11 28 E 2772.94 N 35 26 2~ E Q,_7.0_~__2632_,.01_ 0.70~ 2.666,.89_ __0.7o! .... 21o.1~??_ __0.698 2736._4.9_ 0,511 2771,11 __1.023 2805,~ 0,973 28~0.27 __!,!65 2874,_93_ 0,695' 2909,56 ___52.8..3___~6 15 ~9.26.,_0~ 4872,0a N55,.5.0E i227_~,_l.0_N__163b,_63_E .... 2805,_87_N_35_~0 56 E __5.3.33._~__1_0 49.61_,88__AgOT,.88___N55_,O.OE 2298,98 N 1665,28 E__2838,7~ N 35 55 4 E__ __5~.8~__~ O. 4997,80 ~9~3,80 N54,00E 2319,18 N 1693,60 E__2871,73 N 36 8 20 E 5~33_~3_55 5.0~.3_~78__&979_,78 N53,_OOE 2339,.82_N .... 172!_,_50_5 :zg. 0~_,88_N__36__20 ~6__E __5a~3_4,_~_~5 5_069,70~5015_,.70 NS~,..OgE .... 2.360,52_N 1749,46 E 2938,1~__N_.36__32 36 E 5533 a4 0 5105,59 5051,59 N54,50[ 2380,85 N ~777,72 E 2971,32 N 36 ~ 51 E ....................... ~ECORD .............................. AL. ~___C. AL_.C..U L...A?..! .0 NS_. P.E R F 0 R M. ED_._B Y .... I._ B._.M_. E.L E.C.T_ R 0 N~._C__C._O ~.P.U Z E R .I'._B.U.E .NEA.$, ..... D R_!F.~._V.E._R..T._.I..C AL .......... SUB ................ DR [.F.T .............. .TO.TAL__COORD INATES _D..~P TH.._ANG.~_.E ..... _D_~P_T.H ................. 6EA .... D.I.REC D. M .... 5683._.~ ........... 0 _5_2.1~_,.64 .... 5i59.,6~ ..... N.5.5,00E 2~1_.,39__._N ........... 1862.,_.~.3_E ~0_7.0_,.62_N__~7_20 ........ lZ E ................ 1_,0~2 3013..,_0~.~ ~ e 83_..~.3 ..... ~ .... 5.35.7,.6..]~_.53 0~..,.6~ ..... N5%_,O.0E ~ 52.0.,3 8_N._~i.9 ~.6_E ~.2.0.2..~.92 N_.3.8 ....... 6_1!_ E_~_I- 079 ............ 3.[.B_0..,.~8~ ~9~_~3~0 ...... 539~32 ..... 5.33.9~12 .....N5_7_, 50E 25.3.9_,_~ O_N 2~.0_~,_56_E ~.2_3.5~.6.~_N_~.8_l.8_~.~E ..... 0_,.5_12 .... ~_~.8.~,_0.~ ~ 98.~ ~ ~ ......... 0 .... 5.42 9..,_7.3 ........ .5375.,_73 ....... N 57.-00E 255_7,87._.. N ...... 203~,%3_5 ......... 3.2.6.~, ~.6_. N_3.8_3 0 ........ 5 ..... E .......... 0., 579 ..... 3.2.19.,_31~ .... 6_1 ~__?.~ 0 ~_5.3 7_,_5_3 ........ 5483_,.53 ...... NST.,OOE ......26.1~,~2 N .......212.2.,37_E. ' 3367.,.~_.__N_39 ..... ~._!0_ E ..................... 0,000 __6183._..~ .....0 .... 5.5_7.3.,.~0 ...... 5519.,.50 ........ NSB,OOE 2633,08 N ...... 2.151,66 E 3~00e~1 ...... N..39 1.5 16..._..E ..................... 1,389 ~8~___~3 ~0 5~,17,~5 5663.45 N58,50E 2706.27 N 2269,65 E 3532.0~ N 39 59 7 E 0.966 .... 643.3 4~___0___.5.75_3_,_52 5699.,_52 ...... N58,50E 2.724.,36 N 2299,17 E 356~,88 N ~0 9 43 E 0,660__ _6~83 .....4~__0__5.789_,_A9__5735.,49 N58_._50E_ .... 27.4.2,51_N__Z328_,_7.9_E ....... 35.97_,86_N__4.0_20 9._.E. 0_,000__ ~2.8;8_,..06.___ 3.322..~ 3356.,.7.1~ 3390,96 3~25,17 3~59,40 ...... 3.~_9.3.,_55 __ 352.7_, __6.5~3..3__4._3__3_5__5825.58 577~. 58__N59. OOE__ __658~ ~ 3__._5 0__58 6.1_,..72 ~ 5807.,..72 ..... N58.,.5_OE 2.778_,.39 N 2387,9~ 663.~ __ ~__45.__5_897__,_81 ..... 5843,81 .... N 5 8,_00 E__..2.7.96_,.60 N 2417,34 _668.~_A.~._5.0___5.9_~..~_9.0 ......5.8%93_90 Nse,ooE__2814,93 N__ 6733 /,3 50 5969.96 5915,96 N60.005 2832.77 N 26,76,37 -'67~-3--'-~-3-"3-0"--600-6-,'1-3 5952. 13 ...... N60-.-OOE -285'0'.-03-"N 25C6-.-2-7--E --3's 3 6883 43 50 6078.36 6026,.36 N59.75E 288/~.42' N 2566,27 - , ~_6933__~6,3 ~._30 .... 6.!_!6,..5 3 6060..53 .... N5 9_. 50E ..... 29_01.87 N 2596.06 6983 Z~3 45 6150,72 6096,72 N60.OOE 2919.25 N 2625,86 2760.6,6 N 2358,37 E 3630.71 N 40 30 30 E 0.948 3595,89 3663.55 N__.~O_~O 39 E 0,693 3629.89.~ 3696.55 N ~0 50 22 E 0.511 3663.99 26,46.68 E 3729.63 N 6,0 59 ~7 E 0.180 3698.11 3762.58 N /+1 9 36, E 2,771 3732.16 379' 5-,-27--N--6,'i--i 9-'~ o .... E o-"-6'8'o -3765'.'9 9 3-827",9'5-'N-41 ..... 29 ~3 E~0,832 3799,'78'--- 3860.78 N 41 39 34 E 1,039 3833,70 3893.6~ N 6,1 6,8 58 E 0.720 3867.57 3926.~7 N'6,1 58 16 E 0.692 390!.39 RECORD OF SURVEY A L._ L__ .C.A_L_ C U ~_AZ_! iON. s_.. p. E R F_ 0 RM.E D___BY_J:-.B_ N__ E.. LEC_T R ONI~_C_.O.. MP_U]'_E_R ~_TRUE DOG_LEG .D EP.TH_ANG~.E__ .... D.E P~TH ....... _SEA ......... D..!.RE.C D_I_SZANCE ................... ANGLE .............. D EGA.I_.OO.F~ D ~ DE_G,__ D M $ .ii'17o~'i~3 .... 5o ....... 6~e, 6..~ 6,~,~.~', ~5~.ooE 2~6,~ N ~6~.._~.?.__..F, ......... 3~5~_.,.~ ..... N.....~,~- ........ ? ..... !%.~ .............. .... N.6..Z..ie. OOE _295 4., ,0 9_N 2685,59 E D992,)8 N ~2 ~6 27_E 7.%n3.....~3 %~_6295..,5.~___6241.,5.~ ......... N61_,.OOE .... 2987,_31_N .... 27~,..8.3_E .... ~_05_7..,5.3 ...... N_42__35 17 .... E .............. 0.,5..52 12 33_~2_55 ........ 6!~2.,..0..5 6278~,.05.~N6!.,_2.SE__3~q3.,.aO_N 27!5.7~ a~AS_~9~~.a_~2..~[. ...... 7283 ..... ~ ..... lO .... 6368-59 .... 631~,59 ........ N61,50E ........ 3020,!5 .....N ....... ...... 53 ....... 30 .... E ................. ~3~}__43~_0__6.~0.5-.1.0 .... 6351_,_10 ....... N6I..,OOE 3036,58 N ............. 283.5.,.6~_E._ ~Z5.~,.72 ..... N_43 ...... 2_24__.E_: .......... 0., 7,33_A3 ...... 0 6478.,5.~ .... 6~2~,5~ 2895,15_E ..... .......... ...... 7~ 8 ~ ..... ~ 2 ..... ~ 5 ........ 6.5_1_5..._.1_]_ ..... 6.4 ~ !...t ~ ..... N 6 t.._O 0 a ........ 30.S 5. S 2 ..... N ........ 2 g 25..0.3_~ ..... fi2.5~_..69 N_4.~ .... 28 ..... Z.O_E ..... 0_.?_8.5 7583..._~.2 .... 30 .... &.5_88..,.~.7__6 53 ~, ~ 7 ..... N 6.1.,_00E .... 3118,57_._ N .....298.~..., ~ 8,. E'~.~_3.!6., 56_N__~3_~_~_25_E ........ 0,86 O_ 7~33 ~a .... 50 66zs_,_a3 .... 6571.23 NSe-.OOE 3!35.52 ..... N ...... 3013.,._e3 .... E~~.~9.,!O._N._.43_SI_58_E ..... 1.,_970 _ Z6.8.3_~Z ~o _6_66_L,_9~ 6~PY_..95~6_o_~50E... 3..1_52.6~ N 30~.1~ .E ~38Z,75 N ~a 5e 16 a .... 7~ ~ ~__~ 2_!0 669 8,_e6__6~_,.a s ..... N6.!?O_OE ..~ D 1.69,10 N__3072_,.58_E__~.!~_,.O6__N.__4~ ...... 6_50_E~!_,.093 . _7783_.~ 2_~_0__67_3 5, 77 6681.,77 N 61,50E 3 ! 85,3 2_N ...... 310 2.,.15_E_: ~ ~ ~.6., 30 .... N._~_!~_B.I__E___!.,_I.O 0 __.8033_~.2__30 .... 6919_,_88 .... 6865, 88 .... N5 8,_O.OE 3269,49 N .... 32z+8_., 8.2__E .... __8083_~2_Z5~69_56~_7.6~6902,76 .... N58,00E 3287,38 N 3.277e~5 E __8.~.3~.2_~5 .......... 6_9_9~_,_6.7 .... 6.939.,67 N.5.8,_50E 3305,13 N 3306,1~ .E __8183_4.2_30__7.0 30_,_55~_697~ · 55 ....... N 5 7,_0.0 E_~.323 ,!~_N 3 _823.3_.~.2_.20 7.067, b6_~ 013, a6 N 57,25 E__33.4!, ~ 5_N ~33.6_3_,_0 ~E ~828 }~. ~0 7~D~_,.~ 7050, ~ 7 N 5 T ,_ 2_5 E~3.35 9.,.6.~N .... 3_39_~ 4511,33 N ~4 29 19,5 !,138 ~5.~3,_91 .... N._~ 36 2 E__ 0,~76 4609_,17 .... ~6.y~_e.87_N_& 4707_, 80 N .~ 5 .......... 5_5 ~ E____Z,3!6 ~740,.79 .... 8333_~2__~0____T!~1.,_38___7087_,38 ..... N55,00E ..... 8783_~!_.45 __8~33 ~1 ~5 7215,72__ 712~,~2 ..... N56,50E .... 7161,72 N57,00E 20 .... 39_.E ..~839,~5 N__AS_.2~ .... 58 E ~872,50 N ~5 29 35 E A~ 3.0.1..*.99__ __~ 33_5_,...Z 9~ 4500,56 ~5.&6,-/3 ~599,91__ 4633,20_ 47.66_.~_2_ 2.,296 ~799.,75_ 2.,.270~_L .... 4833.06_ 0.666 4866.01 RECORD Of SURVEY ______A Lt,__CALCULAY. J[ON$_P..ER~ORMEI:)__BY_ ! ..... B_M_._.E LEC~RONIC_COMPUT. ER_ ~T~ _U.E __DOG_LEG _~EA S, .... DR I_F..T_._..V. ERT..I CAL ................ SUB ................ DRIFT ...........TO TAL_.¢OORD I NATES ............ C_L_O._.S..U R_E_S .......... i .......... SEVERLTY_: ...... SECT!ON.__ _DEPTH_ANGLE .... DEPTH ........ SEA ..... DIREC .......................................................... D.I_S.TANCE ................... ANGLE ........... DEG/_iOO.FT ~- DI._STANC~ D~ DE.G., ~D. M ..... S ___848.D__&l__40.?253 ,_0.5__ 7199 , 05 ..... NE.7.~_OOE. _3433-.71 .... N ...... DDO2..e.80_E__~9.05,..ZO ..... N._,...&5___~ ........ 1.~_...E ............... 0.,~60 ___.858.3_40_55__7328,.06_..~27~.,06 ...... N57_,OOE ..... 3~69,.73_N ..... 3558,26_E 496.9,94_N_~5 ~3 .... 18_E ........!,1~0_ ...... 8633_41 ..... 1.5_.?365,.74 .......731!,7~ .......NET,.OOE ..... 3487,63 N .......... 3585_,.82_E .... 5002,1.7_N.45_.47._~3 .... E ................. 0,6~0 __ ~996,8.0__ .... 8733_40_55 ?~1.,.25. 7387,25 _N57,00E .... 3.5.23.,3~ ..... N _3640.,..80_E_ .5.066.,~9_N_~5_56_.21_E ................... 0,!80 .... 5.061_,63_ ~878~_~0_50... 747.9.,.05 ~25,05 .NS.SeOOE _35~0,92 ..... N ...... _3668..,4~_E_ ....... 5098..,56_N_~.6 ......... 0_47_E ........ 0.,874 .... __8.833~_0~.,0 7~6 ,_9.8 7~62..,98 ..... NS.fl.,_50E ~ 35.5 8.,.07_N 369.6_,_!!_E 5_1.30_,4.1_N~6 5_2.~E 0.,_8.0.0 5~2_6_,.0_6_ _. 8883_ ~ 0 .... ~ 0 ..... 7.5.5.5, 0.9 ..... ~ 50 ~.,. 09 ...... N 58...25 E .......... 357 5 · 0 ~..._. N ....... 372_ 3.,67_E___5..!.6 2, 0 4_N ,._4 6._~9 5.9_ E ......... 0 ,.6.92 ~__5157..,_9 ........ 89.33 ~0....10 ..... 7593.,.30 ...... 7539,30 .......NS.8.,25E ...... 3592,0!. N .... 3751.,.10.._.E .... 5_1.93..,58 N...46 ....... !~._.2.8 .... E ........ 0,.000 ~189e.7_2__ ...... 8983 .... 39 .,.55 ........... 7.631 ,.57 ...... ? 5 ? 7,., 57 ........ N 58,25 E .......... 3608 903~ 39 30 ........ 7670-03 7616,03 NEge25E 3625 .... 9083 39 15 .... .77.0.8.,._68 ....... 7654,68 .......N59,50E ......... 36~+1 __9.!.~3_3..9.__5 77~7,45 7693,~5 N58,75E 3657 ,94...N .......... 3778..,76._E____5_22.5.,.05 ...... N.~45 %.8 52 E 0,480 · 51 .N 3805,77 ...... 5 ...... 52.56,26 N 46_23 ..... 22 E ........... 1 · 181 ................ 525.2,85_ · 67 .... N ..... _'.3833_,06__.E___5.28.7_.,.!.7 ..... N._46 ...... 2.8 0__ E 0,5 39 ..... 52.84_,_00_ ,88 N 3860,17 E 5317,99 N ~+6 32 28 E 0,677 5315,04 ...... 9183 ..... 38_30 7.786.-42 ..... 7732,4,2 ........... N58.,50E ........ 3674,,19 ..... 9233...38 .... 5 .... 7.82 5,66 ......... 777 !., 66 ....... N 5.8,2.5E 3690 · 4,3 ..... 3886,92 E 5348,52 N.?5 35_41 3913,30 E 5378,96 N ~+6 40 43 E 0,842 5376,39 _9253_37_5_0 ....... ?_865...,.0_8 ~ 78..l_l,08__N59,00E__3706,45 N 3939,56 __9333 3_7__45 ......... 79.04_,_59 7850,_59 NEg....O_OE___3722,2.3_N ..... 3.965 , 83 __ 9383 _.37_50___7944_*_!0 .... 7890_,10 N 57.,_50E 3738,35_N .... 3991,88 E __943.3__3.7_3_0 7_9.8..3_._6! 7929,67 N57,00E 3754,88 N z~O17,58 ..... 9453_.3.7 .... 15_ 80.2.3.,4!._ ...... 7969,4! .......N57,00E ..... 3771,.~1 N ...... 4,043,03 E__ __9533_37._10 __80.6_3_, 23 8009,23 ....... N5.7, OOE .... 378__7,8 8_N ....... ~068,39 E __~.5.8_~__~ 7 0__8103 ,_1_2 804.9_,_12 ....N57,00E 3804,30 N__4093,58 .... 963.3 .... 36 ..... 50 8_!4,_3_,~09i8089_,.09 N57_eOOE 3820,.66 N 41~8,_8_7_E 9683__36 20 8_1.83..,.2_4 8129,2a, .... N56,75E 3836,95 N ~143,83 E __.9733 35 55 8223,62 ___9783 _35 _! 5 ......82 6a_.,2 8 __9833 4_45 8.3.05_*..2_3 98~3 3z,, 5 8346,48 5~09,06 N 4.5 44 46 E 0,754 5406,67 5/,39,03_ N t+6 ~+8 53 E 0,180 5459.,0~_N.._~5_52_.~2 .... E 1_.,.143--5~66' 5499,10 N ~6 56 8 E__0,774, 54.9_7_,_1.8_ 5528,99 .....N._~6_59 26 E .0.,5.00__ 552.7...!9._ 5588,47 N 4,7 5 54 E 0,340 5586,91 5618,06 N 4,7 9 3 E 0,320 564,7,~3 N 47 12 7 E 1,015 8-169-,'62 NE'6'"5-OE .... 3853',-17 N .... ~1-68'~'5--E "56'7~,'52 N 47 15 2 E 0,838 8210,28 N56,25E 3869,28 N 4,!92,68 E 5705,25 N 47 I7 ~9 E 1,370 8251,23 N56,25E 3885,21 N 4216,53 E 5733,59 N 4,7 20 30 E 1,000 8292e48 N56,50E 3900,86 N 4240,06 E 5761,50 N ~7 23 9 E 1,329 5616,61 56~6,09 5675,28 5704,10 5732,51 5760,51 RECORD OF SUI~V~'Y .... : ~ T...R_U.E ~, E A S .. ..... O R ..!. F.T_.Y E R.T.Z. C A L_~__ 3EP.TH._ANGLE ........ DEPTH DO.G_I,,.F.._G SUB ............. DR.! F.T .............. T..OTAL_.COORD ! NA_TES ............ C_._L_O.._._S__U_.R_E ..... S ......... _SEVER. I._T.Y sEA .............. D..IREC DI..S_Z_ANCE...:. .......... ANGLE ............. DEG/~I_O. OFT D.E.G.~ O M $ ......... SEC.T..] ON ..... D..I..S..TA N C E__ .... 0__..8.~.2.9.,.68 _ B.S ? 5, 68~N 5.9 ,_0.0 E___~ .9_S..O_:5._7_N SD ......... B~TZ,.7.~ ....... 8~7~7~ ..... N60, DOE ........... .... 5_5 .... 8.5.~_3_,_.99 .... 8A59,99 ......... N60_,.OOE 39.57.,..~5._..N~333,~7 .... E ..... 5868,.60 ....... N..?7 .... 35 ~8 E ............... ] ,3~9 _5.867..,_95.~ .~.0_~.S.~.~..~_3.5~8.5_5.6_~5% ..... 8.502.,.5 ~_.N.60..~0.0.5 ' ~_o~.~.__~__~_o .... ~s_9.~..._.~_~ ........... ~.t~ N~o.~o~ ~.~ ~ ~.~ ~ ~.~ N ~ ~z ~ ~ o.~z~ _.~.~_._~..~__ _DAT A_.T o.._ BO.T_T. OM_FR OM_._?H ! S _..PO ! NT F~ OM._...MMS._.S_URV.EY ..~05..t~_29_~5~88a6_.,_6~_es32,6~ ..... N63.,..BOE ~06~_,.9~ .... N~__...~529.,?.5 .... E ....... 608.~.,.2.2 .... N.....¢.8 .... ~ .... O_.E .......... 0,.]?~ ..... 6.08.~_,..ZZ~ _~_06.0.9~0_ 0_ e.9.6.6_,?.~ 89~2,~2__N6_3_,OOE ~082,5~ N__A570,67 E__ 6128,47 N 48 ~3 ~3 E 0,30~ 10703 .... 29 ..... 30 .... 9048.,_03 ....... 8994,03 N64_.,OOE___~.l_0_3_,35 ..... N ~61.2.,41 .... E 61.7.3_,48 ..... N.._.48__.20 33 E ............. 0,591 ~10728___29__3.0~9069.e._79~_9015 J.79 ....... N6.5, OOE .... ~_1.08., 65_N ...... 462 3, 53__E ..... 6.185., 3 l_N.__.~.8 .... 2.2_.27 E ......... 1.,.970 618 5,30__ ~.8..0.0_29~3.0 ~ 9..1.3_2_,~5 9078,~5 N65,50E ~123,~9 N ~655,72 E~6219,2& N ~8 28 9 E O~3~2~621_9..e_2A~ ......... I NTERPO~ATED--T-RUE--VER T.i CAL- ..... OEP. TH$ l,.,--COOED I NATES,-AND-CI~OSURES~-FOR-G I VEN-DEPT.H$· _(ODE ..........MEA S.URED .... _N A M E ...... D. EP.T_.H._ :: TRUE~ _V. ER.T~I CAL .................. T.O..T. AL,.~_C.O0 RD..I.N AT..E.$ ............ C._ L._O_.. S._U_.R_E ............... SUB ,_D E P.T H .... Dj._$..T.AN C.E .......... A NG L~E~ SEA D M ....... S _BASE_SAD ..... _'...! 0.6.~ ................ 8988,08 ......... 4088,17 N z, 581,.80 .NIEAS UR tED__..DEP_T,H_.._AND_O_T HER_DA T.A_, FOR_EVERy_,EVEN_~_O0 ..... F_EE, T_O.F_$ UB_$EA D.EPT. H. ................. ,,,,~ TRUE ......... MEASURED v E R&tCA L._S ........ _DE~_T..H.__.SE.A_D_! F_F.~R EN C E __ .C. OR RE.C T_I_O.N ....... ].5.4 ],.5~_, .............. 100_~0 0 __ 1.64.4.,.99_ N 2.54 25/,.., ............ 2 O0 .................. 0 ................................ 0 ........................ ~t 6_/+4.,.89._N .............. 673.,, 0.3 ........ E S 5 ~, 3.54.,____ .... 300 ............. 0 0 1644..,._.5.4__.N_2. ......... 673_,.01 .... 4_5 t+ 454~ ,__~ 00__0 0 1 55 ~+ 55_4_.,: .................. 5.00 .......... 0 ............................................... 0 3. 643._,4.7_N ........... 672 ,.89 ..... E ....................... 65 A 654, ............... 600 0 ........................................ 0 16.4 S_,. O.e_.N ............. 6.? 2.,.68_.E 754 75 z~, ? 00 ____0 0 1.6~.2_,_82.__N ................. 85 z~ 85.~., ................. 8 O0 ................. 0 ................................................. 0 .......................................... !6.42.:62__N ................ 6?2, .5.3 .... ........................ 954 954, .................. 900 ....... 0 0 !.6_~ 2..,..~+_7_.N 6 105~ 105~+, 1000 0 0 1642,35 N 672,77 1154 1_154., ........ 1t O0 ........... 0 ............................. 0 16.4.2..,_55._N ............. 672_,_82 E 1.2.5 _4 !. 2..5_ 4.., ............ 1200 ............. 0 0 1.6.42.,?..O_N .......... 6.7.Z. :... 8...z+..__E 1.35.? 1._3.5~_, 1.3_00 0 O. ! 6.4.2..,_8.~_N ....6.7.2. 1.~ 54 14.5~+, .......... 1400 .................. 0 ......................................... 0 ............................... ! 64.2e 62_N .......... 672.. ,_.z+7 ...... E 1. 55.z, 1.5.5.4. · ......... ! 500 ...................... 0 ................................ 0 .......................... 16.42._,_.2 Zt_N ....672_,_5 6_ E !657 .165.4_, ......... 1600 0 0 .... 1641,81 N__ 672e62 ................ 175 4 .1.754, ......1700 0 0 ........................................... 16 ~+.1 · 48._..N ............... 6.72 18.5.~+ 18.5_~+., ........... 1800 ..................... 0 0 ........................... 1.6.z+ I_, 13..._.N .......... 672,3 1_9.5_/* l_9.5.Z~e 1900 0 __0 1640,77 N__ 672,13 ...................... 205 ~+ 20.5 ~+, ......... 2000 ............ 0 0 ........................... 16 40.., .9.6 __N ....... 6.7 I..,. 8~+_ E' 2...!..5_~+ 215_~+., 21 O0 .................... 0 0 !641,.17._N .........672_,_1.1 ...... E 2254 225Z+, 2200 0 0 16Z+2,12 N 672,92 E 23.5 ~+ 235'~+-' - -23-00 0 0 i6'4'3'"'62 N --6'7~'"2'5--E 2~54 2454, 2400 0 0 !645,66 N 673,96 E 255/+ 255t+e 2500 0 0 16/+6.90 N 674,28 E .............. 265 ~+ 26_5.~., ..... 2600 .................. 0 0 16Z+_7_e_26_ N .... 674 e.90 E ..................... 275~, 2.7_5~., ..... 2700 0 0 16_47_,_3.3_N ......... 675.., z+5 E 2..85~, 2_8~5.~,, 2800 0 __0 1648,55 N 678,04_E ......................... 295.5 29 5~, ........ 29 O0 ................. 0 0 !65.~.,8.._7_N ............ 684, 89 .... E ................... 3056 305g,, 3000 ! ! 1665,55 N 697,52 E __3!.5~ 3_154,__3100__ A~ ' '3 1678,37 N 715,01 E ................. 326! 325_/+, ...... 3200 7 3 !691e32 N 736.35 E ............... 336 5 3354 · ............ 3300 ............ 11 4 !.70.4_,. 5 9_N ............ 760,3 3_._ E 3Z+70 3454, 3z~O0 15 a~ 1718,62 N 78R,03 E ...................... 357 6- ~.554 , .....3500 ............. 22 7 17 3.5.,_15__. N ........... 819 , 82 ...... E ~,IEASURED-DEPTH-AND-OTHER-DATA-FOR.--EVERY-EVEN .... IO0...,FEET-,OF-.SUB-.SEA .......DEPTH T.RUE ME_A.SUR..ED VERT_I._CAL_SUB ........ ND'.T.VD ..................... VERT.ICAL__ DEpth D.E.P~H.4S E A_D_~.EF~R.E,N C E COR. R E.C~I.ON T_O!AL__C.O~O R D.I~N A ~ES~ 3792 375~., .......... 3700 ............ 38 8 .................................. ~.77.6.,.02_N .............. 89i.,28 ..... .................. 39.0.1 38.5.4.., .... 3.8.00 ............. 47 .................................... 9 l~99eO6_N ............ 928.,16E ~.01.3 3954...,___39.00 .... 5,9 1.2 __1_8.25_~.2..3_N .............. ............ ~!26 .............. ~o.5~, .... ~ooo ......... 71 ............................ 12 ................................. !853.,83_.N ............. lOi~,.lO ~2~.2 ~.1.5~, ........... ~I00 .... 88 17 !.886.,._2.2_N ............... 1.064,12 4~6.3 4.2.5~...,___~200 !09__ 2.1 1923,2~ N ,_~1.!2,0..,.89 .... ~62_.!~_ ~45~_, ........ ~0.0 ........ 1.66 ............................. 32 .................................. 20~3_,_7~_N ........... 12.55,..79 .... 4760 ~.5.5~A..e.~.~.500 .... 2.06 40 ...................... 4.90.! ..................... 465~, ............. 4600 ....... 2.47 ................................. 4! 2..!.26.,.i.5.._N ............. 1~16.,5.2 .................. 50~1 ..................... 475.~, ........ aTO0 .... 287 ........................... ~0 ........................ ,.2.18.2.,_40_N ........... !~96,.93 518...~ ~.85.4., ~.80.0 ...... 3.2.7 ~0 22_38_,..8!_.N .... 1.578.,3.7_E ..................... 5322 ................ ~95~, .............. 4900 ............ 368 al .......... 1658,.91 ...... 5~61 .............. 505a, ........... 5000 ......~0~ 99 .......... 1737.,.09 5600 5.15~._,___5.100 .......... ~6 3.9 2~.07.,.9.5_N ............. 1815_,,~0_E 5739 ............................... 525~., 5200 ........... ~85 39 2~.63.,93 N ........... ~89~,0.0 5878 535~, ..... 5.300 52~ 39 ................................ 2_5i8_~.~9._N .............. 60~7 545~, 5~00 562 38 2570,65 N 205~,~2 .............. 6!56 55.5.~e ...... 5500 ......... 60.2 ~0 ............................ 262.3.,73_N ............ 2~.35-7.4_E 6295 565~, 5600 6~0 38 267~,I1N 2217,62 6~33 575a, 5700 679 39 272~,36 N 2299,17 .... 6572 585~, 5800 718 39 277~,~9 N 2381,36 67!1~ __59.5a_, ...... 5_900____757 39 2825,00_N .......... 68~9 605~, 6000 795 38 2872,73'N 2545,82 6987 615a, 6100 833 38 2920,6~ N 2628,25 7!26 625&e 6200 872 39 2968,~0 N 271!,~0 7263 635~e 6300 909 97 3013-e-72 ..... N ..... 2793,63 --73'9'9 6~5%'; ~a'O0 ga 5 36 3-058-.'~'2-'N--'-2'$ 7 ~", e 3-5 7536 6'¢5~. 6500 ....... 982 ................................... 37 3 !03',-12-N .......... 2955.60 7672 --665&, ...... 6600 1018 ~6 3'1-49",~0- N .... 3036,62 ?~o8 675~. 6700 io~3 3~5 3:i~-j~-~ ~ 3ii~.s~ ................ 79~3 6'8'5~'.- 6800 ..... i089 36 3f3'~780-'~ ....... 3 i 96.35 80? 9 6_95_~e___6_90.0.___1!.2 5 36 3285 , 9 ~ N 32 7 _8~1..5 7054, __7000 ......1.16.1 35 33.3_4.,_S2__N ....... 3352,57 M,,E ASURE o D E P_TH._AN_O_O~. N ER._D A.? A.F.O R_ EV ERY_E V E N ...... 100 ..... F_EET_9_F__S UB_$E A_.DE?T H, i, .......................... ~_ ......... VERTICAL SUB MD-TVD VERTICAL D.F..P.T.H~SE A_DIEF. E RE~C_E CDR.~F~C._T.IDN _ T.O.~.A L___C O0 R,D.! N.ATE. 8.~8 ~ 7.25 4., ............... 72 O0 ............ 1.23.0 3 ................. 86~.7 ................ 7.3.5 ~, .............. 73 0 0 ........ 1263 33 ............................... 3.~,8..!...87_N ........... 3576 8750 745 4., .............. 7400 .......... 1,2,96 3..3 3,5,2~,_3.~,.N ......... 365 0 8981 ..... 7554, 7~00 ~3,27 ........................... 901.2 765~. .......... 76 O0 ... ~...._~.35 ~ ........................... .9.1~.1_. 77_54.,.,, 7700___1~.,87 ...... 29 .......................... 9269 ........................ 7854., .............. 78 O0 ........... 1.~..15 2 ............... 9 ~9.5 .............. 195 A · ~ 900 ..........%44.1 ............ ......................... 96~ 6 ........................ 815 ~, .......... 81 O0 ......... 1~_92 ..................... 25 ............................................... 382~..,.91 ...... N ............ ~ !25, ................. 9~0 ..................... 8254, ...... 8200 ......... 151.6 · ...... 98.9.2_ 8354, 8300. 1_5_38 100! 2 ............................... 8~54, .... S~O0 ........... 1.55.8 ................................. 20 ................................. 3938.,_.60..._N ........... 4300,~ 10!30 ................................. 855~, ......... 8500 ........ 1576 ................................. 1.02~7 8.6.5.~, 8.600 1593 ............ !036~ 8.!.54., ....... 8700 .......... 16! 0 17 !0~79 88.54~ ............ 8800 ....... 162.5 15 hO 53,.6.8_N 10595.. 8..954_,__8900_~640 ............. !0710 ........ 9000 ....... 1656 ............................ -I NT ERPOLATED.-VA~-OES-FOR--EVEN-I-OOO-~,FEET--OF-NE:ASURED--DEP,TH .................................................................................................................. L .... ' .... ......... N E' AS U~ E.D ..... _V...E R_T l..C A .L, ................. ,SUB --._...i.] ............. O EPT..H; .................... D E_P.T_H ........... 5 E A ........... ~_O._TAL .... CO 0 RD..I'_N A.T.. .................................... 1000 9 9.9 ........................ 2000 1999_, ........ 1.9~.5, 16z+.0...76_? ............ 6"t1_.,9~ E 3..00..0 ........................ /~000 39~+2, ............. 3888., ............... ~ ..... !.8.2.2,08.._N ................ 96/+,.55 E_ ~ ................................. _51300 ..... ~6.0.00 _7.000 ..616 ~ · ............. 6.109., ............ 2.9.25 e 16._.N_... ..... : 2.6~ 6,0.2 ..... E_.: ........................................................................................ 8.000. .... --. .6~95e ......... 68z+1~ ............... .3.2.5~e.02 .... N._:_.~229.~.71._IK." ............. 1.0000 ..... .'.. ' ~ ........ HORIZONTAL! V ' - : .... '.; : . .'.". .... . .' SCALE I":1000! ~ : - -- : ATLANTIC RICHFII~'D ' C ' ........ ' DRILL SITE 9-9 ..... ................................................. ' ................................................................... ...... ~ "-' : .... ' ..................RADI US' OF CURVATURE .............. ; ..... GYROSCOPIC SURVEY ..... --,.- - i . .- : ,' ~ l~ . ~ . ~ '- ~ - -' ! - ~ ............... : ........................................................... ~ ........................ ~ ......... ........ , ................. , : '; .... ~ · - : - - ~ ~ '. - - - ~ ............... ~ - l ..... ~ ........... ~ .... ~ . ........ ~ .... . : ; . ~ 8800 8000 -" i " - 7600 ................................................. 7200 TvD= 9,.1:32' TMD= 10~800' _ . 6800 6400 .................. ': .................... 5200 .............. i ......................................... :. _ ~ . ~oo - - ,~¢ -_ ~ ..... - 4000 360o 2800 I ' I ALL DEPTHS SHOWN ......................... ARE TVD ~ , . " ,~oo. - : VERTICAL. SECTiO.N ............... . _ i .... ~ - ' SCALE,":1000' ~ ~ ~ .__t._ 800 ~ ............ ; ATLANTIC RICHFIELD CO. : - ~ DRILL SITE 9-9 t ....................... ,, ...... RADIUS OF CURVATURE ..... ~zoo- . i ....... ~.i _. · - GYROSCOPIC SURVEY I ' . . . ! .... I 'i i ' 1600 - - . ' I : ( ............ . i~ ............. .... 2000- . . 2400 ~ - ' ' .; . . : ~2oo-t- - ...... i " ', [ALL DEPTHS sHoWN~ . .;.. ~ : ! ARE TVD. : ~'':" ' ..... i ....... : . . ,...:-....._,~\ ! ....... i 0°"~ 4 ~" .... , ' ' i ' i ' · , ' 'i ' ....... " - ..... ~ ! .... : ........... : ' -- TVD: 9,157' ...... : ..... ~ , ..... i ..... ,~ .... i I TMD: 10,800''- . P,t~ant~,-H~cnlielclCompany ~ North Arneri~.c~n Producing Division North Aiasr ~strict Post Office ~.,x 360 Anchorage, Alaska 99510 Telephone 907 277 5637 December 14, 1976 Mr. Hoyle Hamilton State of Alaska Department of Natural Resources Division of Oil and Gas 3001 Porcupine Drive Anchorage, Alaska 99501 Subject'S':~ ...... ~'~'~]'~:'~ig3-36-11-15)~7.~ DS 2-3 (23-31-11-15) Permit No. 70-41 Dear Sir' Enclosed please find our Monthly Report of Drilling Operations for the above mentioned wells. Very truly yours, C. R. Knowles District Drilling Engineer CRK/nb Enclosure Ho. P--4 5-1-70 STATE OF /~.LASKA S~CrT l~r DTJPLICAT~ OIL AND GAS CONSERVATION COMMII-rEE MONTHLY REPORT OF DRILLING AND WORKOVER OPERATIONS APl NU.~ERiCAL CODE 50-029-20230 LEASE DESiGIqATION AND SERIAL NO. ADL 28324 ~ IF INDIAN, ALOTT'EE OR TRIBE NAME 1. ~, N~E OF OP~TOR 8. L~IT F.~ OR LEASE At]antSc R~chf~eld Company Prudhoe Bay 2.ADDRESS OF OP~ g WELL NO P. 0. Box 360, Anchorage, Alaska 99510 DS 9-9 (33-36-11-]5) 10 FIE~ ~D P~L. O~ WI~DCAW 4. LOCATION OF WELL 1816'N & 24'N of SE cr Sec 2, TION, R15E, UM Prudhoe Bay-Sadlerochit Pool 11 SEC, T., R., 1VI. (~BO~FOM HOI.~ OB.rEC~ Sec 36, TllN, R15E. 13. RF~ORT TOTAL D~ AT ~D O~ ~ON~, C~NG~ IN HO~ SIZe. CASING A~ C~TING ~OBS INCLUDING DEPTH SET ~ VOL~ USED, P~O~TIONS, ~TS ~ ~SULTS FISHING JO~ J~K LN HO~ ~D SIDE-~CKED HOLE ~D ~Y O~R SIGNIFIC~T ~G~ ~ HO~ ~DITIONS Spudded well @ 0600 hrs 11-10-76. Drld 17-1/2" hole to 2750'. Cond hole for csg. POH. Ran 71 jts 13-3/8" 72# MN-80 butt csg w/shoe @ 2726', FC @ 2645' Cmtd csg w/5950 Arcticset cmt, slurry 15.2 ppg. Cmtd upper 13-3/8'" x 20" anul thru 1" pipe w/150 sx Arcticset. Installed & tstd 13-3/8" pkoff to 2000 psi OK. NU & press tstd BOPE. Pu BHA. RIH to FC. Cond mud. Tstd FC, csg, & shoe to 1500 psi. Drld shoe @ 2726' & 10' new form. Press tstd form OK. PU turb-drill. RIH. Oriented & drld to 3078'. Tripped for BHA. Drld 12-14" hole to 10800' .As of November 30, circ & cond for open hole logs & dropped multi-shot. 14. I hereby certify that t~e I. or/goin~ is t~e and correct NOTE--Report on this form is required for each calendar month% regardless of the status of ap ations-, and must ~ filed in duplicate with the oil and gas conservation committee by the 15th of the succeeding month, ufllees otherwise directed. STATE of ALASKA J1 rector Thru: Lonnie C. Smith Chief Petroleum FROM.' Harole Petroleum Inspector DATE : November 22, 1976 SUBJECT: 1~!itness'flBLP test f~r~ J\rco Sec ! B:> o_n Pe~?.it r-lo 7C-7(~ Sat~~ovember 13, 1976- ! finisneci witnessin~ hal! valve ~.est for ~~t-EEi ~n ~6s~ ~-r Arco and he cane over tn np camp and picked me up at 7:30 P~i. He took me ~, [)S e-q for me to w'~ ~ ~ t'K~P test The test started at 7 '~ '- -~' ~ :uO P!~i. The annt~lar preVm~ter test~u 'to ~:~.,.~u~.~. psi. The upper pipe rams tested 5~00 psi OK. The inside Halliburton low torque wing valve on the kill liF~e and inside ~-~cEvoy valve on the choke side tested to ~nnn psi The s~o~ has ~'~ ftanfied OL~tlets. Low ~i ~e *'~ .... ~' ~','~', · ~' ~', ,- .. ~- t--~ rams ~.~s~,~.~ to 5000 psi. The outside Iow torque wing valves~ both kill va!w~ and choke valve held 5000 psi OK. The check valve also held 5000 psi OK. The accumulator master gauge pressure was 3000 psi. Th~ N2 backup bottles had 2400 psi~ 2400 psi, 2350 psi, 2300 psi. There was a dart valve and ~)all valve on the floor OK. There were 7 Ual!iburton !ow tormue win.~ valves in the cellar away from *~ stack. After initial test, 2 valves that were greased and held 5000 psi. The location is in very goo4 shape, free of debris. The steel fuel tank is also in good shape - no leaks, but not bermed. The reserve pit is open, but well hernied. ~November t~:~, 19i[~ - ~ne lower ~,~e~iy was testeo next and ~..~d :>u~..,,.~ psi '~' r~" ' ~~ i~ kelly also tested to 50nO ps~ .~... The manifold was tested next. ~her,. were six l~alliburton low torture wing valves ~hat tested tn 5000 psi. There were 23 flanqes on tn~ manifol~ The Swaco superchoke ....... ac%uate(~ freely ~' '= ~ was tested to ~finn psi. The .manual choke '-, "' . . ~ ne ;.es,.. pl u~ was pulled and the blind rams tested to 50DO psi. The accumulator controls and remote controls on the floor functioned properly. The well sign was .not on location. They tested with ~iesel and the test plufL~ was a ~-~ellhead type. One 'Flange leaked and 'b. vo valves leaked. tn suJ~: t witnessed a =,OP test for Arco on Drill S~,te ~Sr~ ~a~l~res~ but these were repaired and ali tests were satisfactory. ~irian West, Arco operator, said he would call us as soon as the well was received. Attachment ~eral House it-' _.- . . . )-'Safety. Val SUrface,No· We],l ?'.( )-'We11 :-'~ ' Wel 1 NoS. , , · Obser' , ;&W :'; .... X).-!iBOPE-;-Te~ts'.!~::~ .~:~_~a s i:~ig ~ f l'u'i d- . H,V.d.-, "?'18-2 - );;'-).-'.'-] 9. ...... " . .. ,..- '.i~.'20.;' Drilling spool out'lets .::~'21.' Kill Linel-(_,~ Check ~/e. --,...: (y) (:..)' ':i:. 22'i C'hoke Flowline 0k) t~CR":Va _ .- (})..;:(i i..-,-23. Choke .Manifold No~-: valvsjf ' --: !!.-"_'(Y):' ' (!:') -!':' 24. Chokes-(~Remote( ) Pos. -: ! "(:}) ': :. (',i:.~)- :'!': 2.5.' Test Plug-( )WellhdO~)csg( -. .. '-]0. Gr. Bbls. , , , . (})" (') 26. Annular Preventer,~d~psig ' ' i i-(i:il ' ()Final Abandonment (~) ( ).. 27. Blind Rams~ps~g _ :~? '!i" .' ) .--,~-.i'll' P&A Marker .-' ' : : -(){) . (':,')28. Pipe Rams ~psig ' ()--..:(.:) --'.12. Water well-(. )capped(. )plugged (~) (.) 29. Kelly & Kelly-cock f~mmpsig '' (')':'(")''-'13. Clean-up. - "' ~) (') 30. Lower Kelly valve~~sig ' '~ (") (:') ''.i4'. Pad leveled. . ~ '!"'~., (~) '() 31. Safety Floor valve~BV ~art-. TOtal inSpect'.ioh Observation time6~s~dayS Total n~mber leaks and/or equip, failures~ ' ' -' I''~' ~ "-- ' ' ~ - '- ~' .... ' .c~--~.,~/~,:~ ,ot~ ~n .., ~a~s or w,e, re~.-K ~ns,ecte~ ~/~,~(~, ''.. ...:~...:..':_:: .-~. :(~:'.~:..:"~:::~:.:.::: :~. -.: .. -.:...?,,. ~..::..: .. '..::::..,:-. :-:......:.:j.?.%: :::.:.~.: ...... - . . . ..... ..:::.,.~,:...:~,, .... .. :.,~:: :-:/'~:.:.L ,'-]:.>l~..~i:,~. ~. ~-~:. :~[[~'.'..:~;. ' '.:' : :' :'" ' "-::' ' "'/''' :' ;2~ ',." ~A:-->: :'-( - ":~::,~,~lS.~.....~,:.,:;~..~.[~i~[~' ,? ~.:~,1. :t~: ,.:.~,:,.,, ..~.,,, ~.-.-'- ' Oc~ber 21, 1976 Prudhoe Bay ~ g-g (31-2-10-15) Atlantic Richfield company~ s~ Permit ~. 76-76 M. Waggoner ~ior ~11i~ £ngtr~er Atlantic Richfield Company P. O. Box ~ A~nc~orage, Alaska 99510 ~ar Sir: Enclosed is the approved application for permit to drill the above referenced welt at a l~att~ in ~ti. on l, Township 10{l, Ranoe 1SE, U. M. 14ell samples, core chips and a mud log are not required. A directional survey is require. ~ny rivers in Alaska and their drainage systems have been classified as i~ortant for t~ sp~lng or migration of anadromous fish. Operations in these areas are subject to. AS 16.50.870 and the regulations promulgated t~dnder (Title 5, Alaska Administrative Code). Prior to comencing operations you may ~ contacted .by the Habitat Coordinator's office, Depart- merit of Fish and Game. Pollution of any waters of the State is prohibited by AS 46, Chapter 03, Article 7' and the regulations p~lgated 'thereunder (Title 18, Alaska Administrative C~, Chapter 70} and by the Federal l~ater Pollution Control .Act, as a~. Prior to commencing operations you may be contacted by a rep~sentative of the Department of Environmental Conservation. Pursuant to ~q 3~.40, Local Hire Under State Leases, the Alaska Department of Labor is being notified of the issuance of this permit to drill. To aid us in scheduling field work, ~e would appreciate your notifytn~q this office within 48 hou~ after the ~ell is spudded. 14e would also like to be notifi~ so that a rep~sen~tive of the Division may be present to witness testing of blowout preventer equipment before surface casing shoe is drilled. M.. Waggoner -2- October 21, 1976 In the event of suspension or abandonment please give this office adequate advance notification so that we may have a witness present. Very truly yeurs, Hoyl e I4. Hami I ton Chairman Alaska Oil and Gas Conservation Committee ~qclosure CC: Depart of Fish a~ Game, Habitat Section w/o encl. Oepar~t of Environmental Conservation w/o encl. ~~t of Labor, Supervisor, Labor Law Compliance Oivision w/o ~l. - Atlant[cRichfieldCompany ...... North AmeF""q Producing Division North A~a$~ ~trict Post Office 9ox 360 Anchorage, A~a~k~ Telephone 907 ~77 5637 October 7, 1976 Mr. Hoyle Hamilton State of Alaska Department of Natural Resources Division of Oil and Gas 3001 Porcupine Drive Anchorage, Alaska 99501 RE: DS 9-9 Dear Mr. Hamilton: Enclosed herewith is our Application for Permit to Drill DS 9-9, a $100.00 filing fee, and the required survey plat. Very truly yours, District Drilling Engineer /jw Enclosures Form 10-401 P, E.V. 1.1~71 ia. TYPI: O1' WORK b. 't YPF OF \~,TI,L O:." i, V,'i:.E l_ ~] STA'[E OF ALASKg~:.",~ ~ ;~ APl No. 50-029-20232 L~ ~.5, ' ~'"" ': ..................................... OIL AND GAS CONSER~/ATiON~ COMPliMentS. ...... .~ PEIqMiT TO DRILL OR ~ D a E ? a N ~ a ~<:~ c: ~:,.,~, <:~: ~-'fi:'T~i h'~TX~:~h"77. [:'J~J;-~[:' E(ki [' ...... D 1 L L GAS SIN(iLl: MUL,TIPI E WELl ~] O-I'flER ZONE 2. NA,UE OF OPERATOR Atlantic Richfield Company 99510 3. A'I~Di:ESS OF OI'ERATOP, P. 0. Box 360, Anchorage, At< 4. I OC.,\7IOX OF W£LL Al surface 1698'N of SE cr Sec 2, T1ON, R15E, UM A~ pro?oscd prod. zone 1 320' S & 1 320'W of NE cr Sec 1, T1 0N, R1 5E, UM I3. ])iSTANCE IN MII. ES AND 1)II~,ECTION I:ROM NEAREST TOWN OR POST OFFICE* Approximately fi~ miles northeast of Deadhor'se, Alaska 14. BOND INi;ORMATION: :-y~: Statewides,,~,.~n~/or~o. Federal Insurance Co. 8011-38-40 Prudhoe Uay 9. WI"A,I , DS 9-9 (3]-2-10-15) 10. I"II';I.D AND POOl., OF. V','II.li('AT Prudhoe Bay-- Sadlerochit Pool 11. SI'_'('., T., P,., M, (1~()'1"1 OM 11()1.1,~ 15. DIST:\NCE FROM PROPOSED * LOC.-\TION YO NEAREST }'ROPi'.iU'Y OR LEASE LINE, FT. (Als,> to nearest drip:, unit, if any) 1072' 18. I)IS'I'.-\NCE FROM PROPOSED LOCATION 'I O N!£ARI.iST WELL I)RILLING, COMPLETED, OR APPLIED tieR, FT. 2640 16. No. OI" ACRES IN LEASK 2560 19. PROI'OSEI) I)EFftl 9264'TVD l1042'MD 2i. E!.I:3,'A'I'IONS (Show whether DI:, RT, CR, etc.) 21' Pad Elevation (Gravel) ..... ..s e_c_._'U_T. ].L).[! =__!.U.,5 E 12. I 7. NO,ACI~I,;S ASS1GNI.,I) TO TI ils WE1,1, 320 ?n.p.O'I'AI~.Y Ob'- CABI.I 'IOOI.S ....... ~o_.t?y. .................................... 22. AI>PRO;'L lb\TI: WORK WII,I, S fAl','J .... ,N_'.o__v_e_~.~J::._e_r__2 4.,_:L9.75_ ............ 23. }'ROPOSI~D ('.-*,.$1?~'G AND ('EMIiN I IN(; PROGRAM I 9:i~~~ isJ:q=.aa.J_ l ~z6 ~: ....... ~.5.0.0.:::_.cmt_co_lumn_on_ :1 s,t.--s t a ge---1 ~;00-- s x } &---[..= ~ ~:.00.-.-::-cm~-o,:,-2,~d ....... '~.gc-l. 2~ ...... .,-,,-- ...... Atlantic Richfield Company proposes to directionally drill this well to l1042'.t- 9264'+TVD_ to produce the Sadlerochit zone. Logs will be run across selecSed -iF~:kervals. A 20-3/4" 2000 psi Hydril will be ~sed o~: the 20" coi~ductor. A 13--~/°'',.,/o ~0~0.__~si l-lydril and 13-5/8" 5000 psi pipe and blind tarns will be used on the 13-3/8" casing' The BOP .equipment will be pressure tested each week and operationally tested each trip. A string of 5~:" lY~ N-80 tubing, packer and necessary provisions 'For subsurface safe'ky . equipment wi 11 be run. The packer, wi 11 be set above the Sadl erochi'l;~ The we]'l wi 11 not be perforated at this time. A non-'Freezing fluid will be left in all uncemented annuli within the permafrost'interval. IN ABOVE SPACE DESCRIBE PROPOSED PROGRAM: if propo~ql is to deepen ~','e data on present i)roduclivc zone and i,r<Hmsed new productive zone. tf proposal is to dr~l or deepen dkectio:m!ly, \dye pcrlincnt &tta on 5ub~urfnce locations aud measul[ d ami true 2~. i hs~eb:'Y,wNh~,~th >~qe Fc retoino is True and Correct . :==-=~:~:::~:{~~=L~- .... : ~=:- ....::-----~---~ ....... ~ ........... ~ ........... ~:=- .... -: =:----: ........................................ '=..::-:::- ............... ' :DiIii::CI'tONAL SL:RV::Y RI:QUII:ED A.P.I. NL'MI:I~ICAI_ CODE [_ ~3,~ Dxo 50-029-20232 ~'l:,~,,:~ :.,_,. APPROVAL 1_ A~ I.'. APPOW::~ ~Y ~~~ Trr~_.: Chairman ':See Instruction On Reverse Side October _g_!_,__ ]__9_7.6_ ............................ D^-n:_..0C_tP_b_e__r.._ .2.!,__J 97 6 Well 7 24' Well 0.0' DWell I I 1 SECTION 2 SECTION SECTION ' SECTION CERTIFICATE OF SURVEYOR I HEREBY CERTIFY THAT I AM PROPERLY REGISTERED AND LICENSED TO PRACTICE LAND SURVEYING IN THE STATE OF ALASKA AND THAT THIS PLAT REPRESENTS A LOCATION SURVEY MADE .BY ME OR UNDER MY SUPERA/ISION, AND ALL DIMENSIONS AND OTHER DETAILS ARE CORRECT. J~.c ~.1~7~ DATE SURVEYOR A BUILT WELL No. 7 LAT. 70°14'52.613" LONG. 148° 14' I0 146" Y 5 943 399.24 X 718 315.12 WELL No. 8 LAT. 70o14'51.460'' Y 5 943 282.76 LONG. 148014'09.433'' X 718 343.04 WELL No.9 LAT. 70°14'50.304'' Y 5943 165.96 LONG, 148o14'08.723'' X 718 370.86 · EXISTING WELL OR CONDUCTOR PIPE ICKDt HVL No. 35-DS9-76 I r 'DATE l ARCO No. REVISION ATLANTIC RICHFIELD CO. AS BUILT DRILL SITE No.9 WELLS No. 7,81 9 LOCATED IN PROTRACTED SECTION 2, T. ION.~ R.15E.~U.M. PREPARED BY HEWITT V. LOUNSt3URY 8 ASSOC. 723 W. 6th AVE.~ ANCHORAGE~ ALASKA DATE I1~ JUNE 76 SCALE I": 20(D' ___ CHKD BY GD FIELD BK LOOSE ~EAF BP ALASKA INC. 311 1 - C - STREET · TELEPHONE {907) 279-0644 State of Alaska Department of Natural Resources Division of Oil and Gas 3001 Porcupine Drive Anchorage, Alaska 99510 Attention: Mr. Hoyle Hamilton Acting Director Gentlemen: Drill Site 9-9 (31-2-10-15) Prudhoe BaY Field MAILING ADDRESS: P.O. BOX 4-1379 ANCHORAGE, ALASKA 99509 October 15, 1976 We have reviewed a copy of Atlantic Richfield Company's Application of Permit to Drill the subject well from a surface location of 1698'N of the SE cr. Sec. 2, T10N, R15E, UM to an 8800' subsea target 1320'S and 1320'W of the NE cr. Sec. 1, T10N, R15E, UM. We understand the well is projected to be 1179'S, 1072'W of SW cr. of BP Alaska, Incorporated's lease ADL 28343 at TD. BP Alaska Incorporated, being the affected operator as per Paragraph 22.050, Title II, Part 3 of the Alaska Administrative Code, has no objection to the drilling of this well. Very truly yours, BP ALASKA INC. , i~ ~..~ ' G. D. Taylor Manager Operations GDTPRJ: j le cc: DEV-PB-072/2 Atlantic Richfield Company North Alaska ~".istrict Post Office 360 Anchorage, Alaska 99510 Telephone 907 277 5637 October ll, 1976 Mr. P. R. Judd BP Alaska, Inc. P. O. Box 4-1379 Anchorage, Alaska 99509 Subject: Drill Site 9-9 (31-2-10-15) Prudhoe Bay Field Dear Mr. Judd: We propose to drill the subject well from a surface location of 1698'N of SE cr, Sec 2, TION, R15E, UM to a 8800' subsea target of 1320'S and 1320'W of NE cr Sec 1, TION, R15E, UM. At TD the well is projected to be 1179'S, 1072'W of SW cr of BP lease ADL 29343. Atlantic Richfield will drill and operate the well. Attached is a copy of State Form 10-401, Application for Permit to Drill. Under Paragraph 22,050, Title II, Part 3, of the Alaska Administrative Code, you are classified as an affected operator as far as the proposed well is concerned. Before the State of Alaska Oil and Gas Conservation committee can approve our application for a permit to drill this well, a letter of non-objection from BP Alaska is required. We would be grateful if you would give this matter your earliest attention and if you are in agreement, sign the enclosed letter and transmit it to the Alaska Division of Oil and Gas at your earliest convenience. Very truly yours, District Drilling Engineer CRK/jw Enclosures cc- State of Alaska Division of Oil and Gas CHECK LIST FOR NEW WELL PE,xu, ITS I. I-s the permit fee attached ' . 2. Is well to be located in a defined pool 3. Is a registered survey plat attached . Compa ny ~2t~-~_~<]) Yes Ho Remarks ,/ 4. Is well located proper distance from property line ..... .. . ~ 5. Is well located proper distance from other wells . . E. Is sufficient undedicated acreage available in this pool ...... ~ 7 't, Is well to be deviated ................ ~}~ 9,. Is operator the only affected party Can permit be approved before ten-day wait ......... ,3. Does operator have a bond in force ....... 1_ Is a conservation order needed ........... 2. Is administrative approval needed 3. Is conductor'string provided . ~. Is enounh cement used to circulate on conductor and surface .~ Will cement tie in surface and intermediate or production strings 5. Will cement cover all knov,'n productive horizons ....... 7 Will surface cas;rig prou=cf fresh water zones S. Will all casino aive ade.cuate safe~y in collapse, tension 9. Do~s .... BOPE have sufficie~.f pressure ratina., . ., dditional Requirements' Well Histo.ry File APPENDIX 'Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history file, To improve the readability of the Well History file and to simplify finding information, information-of this nature is accumulated at the end of the file under APPENDIX.' ., No' special'effort has been made to chronologically organize this category of information. ~t)t, onn O00r).Of) 222222 55.55555555 090000 o t, 0 t~ t:. t.., OOOO00 222222 5555~55555 OOOOO0 ~ ~ 00 00 22 2 2 55 0 () 00 ~.,t, O0 O0 22 22 55 O0 Ou 6e:, O0 OGO0 22 555~55 O0 0000 ~ O0 C)OOG' 22 ~5~5~% O0 0000 ~SbO6e~ O0 O0 O0 22 55 O0 O0 O0 e~,~ob6~ O0 O0 O0 22 55 O0 OO O0 uO, t,O 0000 O0 22 55 0000 t~6 ~; O0 O0 22 55 55 oO O0 f.) ~ e~ 6 00 00 22 55 55 00 00 66b066 0000()() 2222222222 555555 000000 t,e, O6b6 0000(~0 2222222222 555555 000000 g 1-.'~ i:t I 'i'{ ) F b ','..~ $ ~. L I (> E: 3 4. ,.l L)13- l q. , S T A i¢' T :'* [ I i I. ! I 1t I] J[ [ 1 i ! I! 1 1 1 1 l .[ .L 1 I [ til ! P P P P t-~CCC PCCC VV v v El:. k~ V¥ v v [:,E h.F, PR VV ~,' v LF t~F VV v v t~ L ~ VV '~, v EL ~R PR V V V v E i-. P R F,: II 1.11 '1. Ii !I 11 II I1 11 I1 ] I ]I 1! I [ I 1 1 ! iL1 I :I i1. Fi" t'F' WY. 1.4:18:05 bA'l~l 80/ i.) A i k,: l,..l i) t ~ i 2 0 ,F 1 B l; C: 0 j.( 1-., p C, tl)i' b rt J TS GAi-' I [., C/C CPS CPS GAP t p !J C/(" CPS CPS C/( CPS C/C C [:' S Cf'5 j. Al~ ]. AP 3LZ~. t 0.2 {> (). () 00 ,1. {'~ 1 (," . < 'v. 000 o,,. N C !', b Gl:< !<t C N b '<~ R g T N [" H ]. G ,P 82. 227. 2. 1.07. 2~9. :~4. 20. ~ v 9. 99. 254. 1. . O. .t08. 2. 1.5. O. 12 3. 4. 51. -999. -999. -999. -999. -999. -999. -999. -999. -999. · (; n © · 429 .429 37 ;5) 60 ~) 25(, 953 0 4o 8 () 0 7 ? 7 900 200 9 040 0 00 O0 0 0 2 2 07 ,! 34O 000 000 552 16 0 960 25O 25O 25O 250 25{; 25O 25O 25O GP FCbl, N C i'i L N f-: A T GP ~'~ R a T GA r,~ p F~ I G~ F C N b a P H I GR FCr,~L N P H 1 0. ~) 2 O 0. O 0 () U. 0 0 0 [). 0 0 0 27. ~60 34.500 Su.652 2.~98 39.18O 40.1 O0 280.1. 37 10.060 1.6.000 141..9q9 11 .a40 116.100 1.39.425 503.21 ? ! .9o4 o. O 20 94.70(3 I, 45.4 31 312.312 ('). o 20 4~4.900 29.601 i24.839 4.496 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 G ~ F C~'~u ~'~ C N b nCab r~RAT G~ r,~ R A 1 GA ? CJ*~L I~ C N u ['J P H 1, f4 P Fi 1 GR i~C N L Fi C N G R N P H 1 GR V A L, ti ~ OO2 020 009 429 429 2.930 29.180 38.000 82.797 231.e6o 3.59d 40.b00 41.900 lll.lll 269.575 1.720 20.620 17.b(}0 Ig2.857 338.9if) 1.910 22.b40 11.0.100 2~ 3. ,:t06 512.226 0.000 14. ,t40 96.900 43. I 15 07.593 0. 000 55.700 39.90O 30.030 124.839 -999.250 -999.250 -999.250 -999.250 -9q9.250 -999.250 -999.250 -999.25() -999.250 -999.250 ~C ~b GR b CNb GR t'~CNb NPHI G~ NCqL n aA i' GR FCNL NCNb NRAT NPHI NCNb NPH 1 [,~ R A T N P H 1 GR NCNb NPHI GR ~'C N b Ni-{AI' FCNL vAI,UL 0.429 0.002 0.020 0.000 0.858 239.811 2.904 21. 79. 2 i4.5b0 3.ol 2 .45.480 49. 300 i17.11 1 5'13.972 2.458 19.aoo 18. lO0 141 . 141 ~. 9.3..350 2. 12.120 10 1.500 25 3.539 0. 000 2.138 1,4.520 103.000 I 39.42 5 0.000 4.258 54.680 34.800 27.885 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 ] t~24. l:itr, lLS AP 1. GAPI. ~52 311 32 0 CtC' 42 42 CPS 42 (, P S ~ 2 3 .t 9 3 () P [~ 4 2 O 9 3 0 C/C CPS q2 .~4 92 0 CPS -'~ 2 3 '~ 9 3 o t'U .~2 68 3 0 C lC 4 2 ,~ 2 1 ~'~ [', i,i ij i, ] C F C F: L, G~ i"] C H b ?C,a b hi P A l' i'.l C N b 7~. 228. 9i. 220. 17. 87. 251. 3. 1. 21. 70. 0. 4. I ? 1. 70. O. 2i . 70. O. 5. -999. -999. -999. -999. -999. -~99. 00 O 0 O0 ?3 93 22 20 3'7 9.~ C} I 94 39 4b 60 35 On 52 (~0 L} 5 O0 60 00 00 25 25 25 2.5 25 25 25 r'.a P h I F C~ql,, P. C t, b N P i'~ 1. F C i-~ fL, GF: ~ ~ [ )lH i GP t~'C: ~ L :h~ ' .F C: ~'. b 1~ P H i Gg .f' ..., h! b o 2O 00 n 858 2 '?. 100 7 9.794 40.2 20 B2.797 27.500 ~ 2.000 ~.100 0.000 0. () o () 38. t 00 0. OOO (). 0 () 0 3 8. ! 00 -999.250 -999.250 -999.250 -999.250 -999,250 '999.250 i*1:,~ L r,4[ tN 1 C MNE:M[jN lC VAbUm 2.842 25.58(') 25.984 G~ r ~J C ~ l{ i~ 220.07 1 !gRAT 2.7bO i~PH1 ]0.078 Gl-: 39. 969 NF'ial. hRA',£' 2.868 NCNb 2~0.~,32 NPHI 28.540 N~Ai' 2.852 GA 20.797 ~PHI 33.b91 ix~RA r {.540 aCNb 252.~81 i-~ P ~ 1 - 5.000 ~"_~ a A i' 0.000 G~ 8 ~, 3-15 NPHI 55.2'73 J:~ ~ A' [; l ]. 5 $ O ~'~ C N b 252. b 81 [~pH 1 -5. 000 NRA'r O. 000 bR 74. )50 NPH I 52.39 3 i'~ R A I 3.5 ,i ~ N C N b 252. o 81 GR ,31.984 NPH i 60.30 3 =999.25{) 'g99. 250 5 7. 969 -999.250 -999.250 -999,25() GR N~,A~I -999.250 t'~C Nb -999.250 NRAf -999.250 NPHI -99925.000 ?~ 80/ ] ! 20