Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAboutPBU CCP/FFGU - Hilcorp North Slope, LLC2. Facility NamePBU CCP/FFGUPercent100.00%MCF19. Remarks:0CommissionerDateBlock 6: Includes Gas Sales to Alyeska Pipeline, Norgasco, Northstar and KRU; Block 12: Includes COTP Non-PBU Fuel Gas = 8,245 mscf; Block 18:Fuel Gas to LPC = 0 mscfI hereby certify that the foregoing is true and correct to the best of my knowledge.SignatureTitleNote: All volumes must be correctedto pressure of 14.65 psia and to atemperature of 60o F. Authority 20AAC25.235.Printed NamePhone12. Fuel gas used in lease operations.7,136,616DateMCF15. NGL Gas Equivalent0ConservationMCF16. Purchased gas0Waste:17. Transferred from: CGF & FS1238,167,24018. Transferred to: (Express as a negative #)13. Other (see instructions)0Official Use OnlyAuthorization >1 hr:SafetyMCF14. TOTAL VOLUME (ITEMS 6-12)238,167,240Lease Use11. Assist Gas09. Flared or vented more than 1 hour (see instr.)010. Pilot and Purge35,5738. Flared or vented 1 hour or less1650290000000 PBU - EOA HILCORP NORTH SLOPE January-2021Disposition Volume MCF20.For production from multiple pools, list contribution of each pool as a percent ofTotal Volume.6. Sold498,947Pool Name Pool Code7. Reinjected230,495,939PRUDHOE 640150STATE OF ALASKAALASKA OIL AND GAS CONSERVATION COMMISSIONFACILITY REPORT OF PRODUCED GAS DISPOSITION1. Facility Number 3. Field 4. Operator 5. Month/Year of DispositionForm 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in DuplicateTommy HoangProduction AnalystTommy Hoang346.237.22442/18/2021 HILCORP ALASKAPRUDHOE BAY UNIT - CENTRAL COMPRESSOR PLANTGAS FLARING AND VENTING INCIDENT REPORTJanuary 2021Unplanned events less than or equal to 1 hourDATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE1/11/2021 1555-1600 8 Not required for events <= 1 hr Not required for events <= 1 hr1/11/2021 1625-1630 8TOTAL 16Unplanned events greater than 1 hourDATE TIME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSESee Attachments See AttachmentsTOTAL0Planned events less than or equal to 1 hourDATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE1/1/2021 0045-0050 135 Not required for events <= 1 hr Not required for events <= 1 hr1/5/2021 0250-0255 14TOTAL149Planned events greater than 1 hourDATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSESee Attachments See AttachmentsTOTAL0 TOTALUnplanned Events < 1 Hour 16Unplanned Events > 1 Hour 0Planned Events < 1 hour and not 149exceeding 5,000 MCFPlanned Events > 1 hour or 0exceeding 5,000 MCFPilot Purge 35,573Assist 0TOTAL FLARED VOLUME 35,738 2. Facility Name PBU CCP/FFGU Percent 100.00% MCF 19. Remarks: 0 Commissioner 346.237.2244 Date 3/15/2021 Block 6: Includes Gas Sales to Alyeska Pipeline, Norgasco, Northstar and KRU; Block 12: Includes COTP Non-PBU Fuel Gas = 6,773 mscf; Block 18: Fuel Gas to LPC = 0 mscf I hereby certify that the foregoing is true and correct to the best of my knowledge. Signature Tommy Hoang Title Production Analyst Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60o F. Authority 20 AAC25.235.Printed Name Tommy Hoang Phone 12. Fuel gas used in lease operations.5,930,645 Date MCF 15. NGL Gas Equivalent 0 Conservation MCF 16. Purchased gas 0 Waste: 17. Transferred from: CGF & FS1 207,538,488 18. Transferred to: (Express as a negative #) 13. Other (see instructions)0 Official Use Only Authorization >1 hr:Safety MCF 14. TOTAL VOLUME (ITEMS 6-12)207,538,488 Lease Use 11. Assist Gas 0 9. Flared or vented more than 1 hour (see instr.)0 10. Pilot and Purge 30,751 8. Flared or vented 1 hour or less 3,662 0290000000 PBU - EOA HILCORP NORTH SLOPE February-2021 Disposition Volume MCF 20.For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 503,028 Pool Name Pool Code 7. Reinjected 201,070,402 PRUDHOE 640150 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 3. Field 4. Operator 5. Month/Year of Disposition Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate HILCORP ALASKA PRUDHOE BAY UNIT - CENTRAL COMPRESSOR PLANT GAS FLARING AND VENTING INCIDENT REPORT February 2021 Unplanned events less than or equal to 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 2/19/2021 1458-1503 8 Not required for events <= 1 hr Not required for events <= 1 hr TOTAL 8 Unplanned events greater than 1 hour DATE TIME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE See Attachments See Attachments TOTAL 0 Planned events less than or equal to 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 2/7/2021 0102-0113 461 Not required for events <= 1 hr Not required for events <= 1 hr 2/13/2021 2217-2222 408 2/13/2021 2255-2300 109 2/14/2021 0120-0125 152 2/16/2021 0453-0458 109 2/16/2021 0940-0945 43 2/16/2021 1356-1401 109 2/16/2021 1552-1557 408 2/18/2021 1207-1212 135 2/18/2021 2046-2051 135 2/18/2021 2201-2206 8 2/18/2021 2310-2315 135 2/19/2021 0141-0146 135 2/19/2021 0317-0322 8 2/19/2021 0544-0549 135 2/19/2021 0930-0935 135 2/19/2021 1045-1050 156 2/19/2021 1148-1153 135 2/19/2021 1230-1235 156 2/19/2021 1310-1315 135 2/19/2021 1422-1427 156 2/19/2021 1429-1434 135 2/19/2021 1602-1607 156 TOTAL 3,654 Planned events greater than 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE See Attachments See Attachments TOTAL 0 TOTAL Unplanned Events < 1 Hour 8 Unplanned Events > 1 Hour 0 Planned Events < 1 hour and not 3,654 exceeding 5,000 MCF Planned Events > 1 hour or 0 exceeding 5,000 MCF Pilot Purge 30,751 Assist 0 TOTAL FLARED VOLUME 34,413 2. Facility Name PBU CCP/FFGU Percent 100.00% MCF 19. Remarks: STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 3. Field 4. Operator 5. Month/Year of Disposition 0290000000 PBU - EOA HILCORP NORTH SLOPE,March-2021 Disposition Volume MCF 20.For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 501,432 Pool Name Pool Code 7. Reinjected 226,383,278 PRUDHOE 640150 8. Flared or vented 1 hour or less 1,215 9. Flared or vented more than 1 hour (see instr.)0 10. Pilot and Purge 33,920 11. Assist Gas 0 13. Other (see instructions)0 Official Use Only Authorization >1 hr:Safety MCF 14. TOTAL VOLUME (ITEMS 6-12)233,470,231 Lease Use 12. Fuel gas used in lease operations.6,550,386 Date MCF 15. NGL Gas Equivalent 0 Conservation MCF 16. Purchased gas 0 Waste: 17. Transferred from: CGF & FS1 233,470,231 18. Transferred to: (Express as a negative #)0 Commissioner 346.237.2244 Date 4/19/2021 Block 6: Includes Gas Sales to Alyeska Pipeline, Norgasco, Northstar and KRU; Block 12: Includes COTP Non-PBU Fuel Gas = 2,615 mscf; Block 18: Fuel Gas to LPC = 0 mscf I hereby certify that the foregoing is true and correct to the best of my knowledge. Signature Tommy Hoang Title Production Analyst Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60o F. Authority 20 AAC25.235.Printed Name Tommy Hoang Phone Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate HILCORP ALASKA PRUDHOE BAY UNIT - CENTRAL COMPRESSOR PLANT GAS FLARING AND VENTING INCIDENT REPORT March 2021 Unplanned events less than or equal to 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 3/22/2021 1844-1849 135 Not required for events <= 1 hr Not required for events <= 1 hr 3/22/2021 1938-1943 135 3/22/2021 2041-2046 135 3/22/2021 2107-2112 8 3/28/2021 0505-0510 156 TOTAL 569 Unplanned events greater than 1 hour DATE TIME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE See Attachments See Attachments TOTAL 0 Planned events less than or equal to 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 3/15/2021 0525-0535 135 Not required for events <= 1 hr Not required for events <= 1 hr 3/15/2021 0730-0735 14 3/22/2021 0855-0900 135 3/22/2021 1342-1347 45 3/28/2021 0554-0601 135 3/28/2021 0650-0655 11 3/28/2021 0715-0720 6 3/28/2021 0805-0810 135 3/28/2021 0918-0923 8 3/28/2021 1022-1027 8 3/28/2021 1355-1400 14 TOTAL 646 Planned events greater than 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE See Attachments See Attachments TOTAL 0 TOTAL Unplanned Events < 1 Hour 569 Unplanned Events > 1 Hour 0 Planned Events < 1 hour and not 646 exceeding 5,000 MCF Planned Events > 1 hour or 0 exceeding 5,000 MCF Pilot Purge 33,920 Assist 0 TOTAL FLARED VOLUME 35,135 2. Facility Name PBU CCP/FFGU Percent 100.00% MCF 19. Remarks: STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 3. Field 4. Operator 5. Month/Year of Disposition 0290000000 PBU - EOA HILCORP NORTH SLOPE April-2021 Disposition Volume MCF 20.For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 414,296 Pool Name Pool Code 7. Reinjected 212,240,770 PRUDHOE 640150 8. Flared or vented 1 hour or less 4,309 9. Flared or vented more than 1 hour (see instr.)0 10. Pilot and Purge 35,319 11. Assist Gas 0 13. Other (see instructions)0 Official Use Only Authorization >1 hr:Safety MCF 14. TOTAL VOLUME (ITEMS 6-12)218,863,717 Lease Use 12. Fuel gas used in lease operations.6,169,023 Date MCF 15. NGL Gas Equivalent 0 Conservation MCF 16. Purchased gas 0 Waste: 17. Transferred from: CGF & FS1 218,863,717 18. Transferred to: (Express as a negative #)0 Commissioner 346.237.2244 Date 5/14/2021 Block 6: Includes Gas Sales to Alyeska Pipeline, Norgasco, Northstar and KRU; Block 12: Includes COTP Non-PBU Fuel Gas = 4,902 mscf; Block 18: Fuel Gas to LPC = 0 mscf I hereby certify that the foregoing is true and correct to the best of my knowledge. Signature Tommy Hoang Title Production Analyst Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60o F. Authority 20 AAC25.235.Printed Name Tommy Hoang Phone Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate HILCORP ALASKA PRUDHOE BAY UNIT - CENTRAL COMPRESSOR PLANT GAS FLARING AND VENTING INCIDENT REPORT April 2021 Unplanned events less than or equal to 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 4/20/2021 1953-1958 8 Not required for events <= 1 hr Not required for events <= 1 hr 4/21/2021 1542-1547 109 4/21/2021 1628-1633 109 4/21/2021 1708-1713 109 TOTAL 335 Unplanned events greater than 1 hour DATE TIME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE See Attachments See Attachments TOTAL 0 Planned events less than or equal to 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 4/1/2021 0534-0539 156 Not required for events <= 1 hr Not required for events <= 1 hr 4/1/2021 0800-0805 11 4/1/2021 1530-1535 156 4/5/2021 1353-1427 357 4/15/2021 1439-1444 156 4/15/2021 0303-0308 135 4/15/2021 0424-0429 11 4/15/2021 0827-0832 14 4/15/2021 1846-1851 135 4/15/2021 1922-1927 14 4/16/2021 1356-1401 77 4/16/2021 2013-2018 8 4/16/2021 2045-2050 156 4/16/2021 2204-2209 135 4/16/2021 2243-2248 11 4/17/2021 0145-0150 14 4/17/2021 2016-2021 156 4/17/2021 2221-2226 11 4/18/2021 0152-0157 135 4/18/2021 0553-0558 14 4/18/2021 1536-1541 45 4/18/2021 1722-1727 135 4/18/2021 1934-1939 14 4/19/2021 0155-0200 135 4/19/2021 0340-0345 14 4/19/2021 2320-2325 135 4/20/2021 0114-0119 14 4/20/2021 1530-1535 408 4/20/2021 1752-1757 408 4/20/2021 1858-1903 135 4/21/2021 0043-0048 408 4/21/2021 0331-0336 152 4/21/2021 1455-1500 109 TOTAL 3,974 Planned events greater than 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE See Attachments See Attachments TOTAL 0 TOTAL Unplanned Events < 1 Hour 335 Unplanned Events > 1 Hour 0 Planned Events < 1 hour and not 3,974 exceeding 5,000 MCF Planned Events > 1 hour or 0 exceeding 5,000 MCF Pilot Purge 35,319 Assist 0 TOTAL FLARED VOLUME 39,628 2. Facility Name PBU CCP/FFGU Percent 100.00% MCF 19. Remarks: STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 3. Field 4. Operator 5. Month/Year of Disposition 0290000000 PBU - EOA HILCORP NORTH SLOPE May-2021 Disposition Volume MCF 20.For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 415,085 Pool Name Pool Code 7. Reinjected 214,689,930 PRUDHOE 640150 8. Flared or vented 1 hour or less 1,756 9. Flared or vented more than 1 hour (see instr.)0 10. Pilot and Purge 36,309 11. Assist Gas 0 13. Other (see instructions)0 Official Use Only Authorization >1 hr:Safety MCF 14. TOTAL VOLUME (ITEMS 6-12)221,347,880 Lease Use 12. Fuel gas used in lease operations.6,204,800 Date MCF 15. NGL Gas Equivalent 0 Conservation MCF 16. Purchased gas 0 Waste: 17. Transferred from: CGF & FS1 221,347,880 18. Transferred to: (Express as a negative #)0 Commissioner 346.237.2244 Date 6/16/2021 Block 6: Includes Gas Sales to Alyeska Pipeline, Norgasco, Northstar and KRU; Block 12: Includes COTP Non-PBU Fuel Gas = 2,702 mscf; Block 18: Fuel Gas to LPC = 0 mscf I hereby certify that the foregoing is true and correct to the best of my knowledge. Signature Tommy Hoang Title Production Analyst Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60o F. Authority 20 AAC25.235.Printed Name Tommy Hoang Phone Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate HILCORP ALASKA PRUDHOE BAY UNIT - CENTRAL COMPRESSOR PLANT GAS FLARING AND VENTING INCIDENT REPORT May 2021 Unplanned events less than or equal to 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE Not required for events <= 1 hr Not required for events <= 1 hr TOTAL 0 Unplanned events greater than 1 hour DATE TIME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE See Attachments See Attachments TOTAL 0 Planned events less than or equal to 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 5/22/2021 0215:0230 689 Not required for events <= 1 hr Not required for events <= 1 hr 5/24/2021 2220:2230 135 5/25/2021 0015:0020 8 5/25/2021 0503:0518 775 5/30/2021 0959:1004 135 5/30/2021 1212:1217 14 TOTAL 1,756 Planned events greater than 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE See Attachments See Attachments TOTAL 0 TOTAL Unplanned Events < 1 Hour 0 Unplanned Events > 1 Hour 0 Planned Events < 1 hour and not 1,756 exceeding 5,000 MCF Planned Events > 1 hour or 0 exceeding 5,000 MCF Pilot Purge 36,309 Assist 0 TOTAL FLARED VOLUME 38,065 2. Facility NamePBU CCP/FFGUPercent100.00%MCF19. Remarks:STATE OF ALASKAALASKA OIL AND GAS CONSERVATION COMMISSIONFACILITY REPORT OF PRODUCED GAS DISPOSITION1. Facility Number 3. Field 4. Operator 5. Month/Year of Disposition0290000000 PBU - EOA HILCORP NORTH SLOPE June-2021Disposition Volume MCF20.For production from multiple pools, list contribution of each pool as a percent ofTotal Volume.6. Sold359,065Pool Name Pool Code7. Reinjected195,794,422PRUDHOE 6401508. Flared or vented 1 hour or less09. Flared or vented more than 1 hour (see instr.)8,52410. Pilot and Purge35,10811. Assist Gas013. Other (see instructions)0Official Use OnlyAuthorization >1 hr:SafetyMCF14. TOTAL VOLUME (ITEMS 6-12)201,632,400Lease Use12. Fuel gas used in lease operations.5,435,281DateMCF15. NGL Gas Equivalent0ConservationMCF16. Purchased gas0Waste:17. Transferred from: CGF & FS1201,632,40018. Transferred to: (Express as a negative #)0CommissionerDateBlock 6: Includes Gas Sales to Alyeska Pipeline, Norgasco, Northstar and KRU; Block 12: Includes COTP Non-PBU Fuel Gas = 872 mscf; Block 18:Fuel Gas to LPC = 0 mscfI hereby certify that the foregoing is true and correct to the best of my knowledge.SignatureTitleNote: All volumes must be correctedto pressure of 14.65 psia and to atemperature of 60o F. Authority 20AAC25.235.Printed NamePhoneForm 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in DuplicateProduction AnalystBeth Farouse713-289-26279/22/218,524DSR-2/14/22JLC 2/16/2022Daniel SeamountDigitally signed by Daniel Seamount Date: 2022.02.15 08:56:07 -09'00'Jeremy PriceDigitally signed by Jeremy Price Date: 2022.02.16 13:43:27 -09'00' HILCORP ALASKAPRUDHOE BAY UNIT - CENTRAL COMPRESSOR PLANTGAS FLARING AND VENTING INCIDENT REPORTJune 2021Unplanned events less than or equal to 1 hourDATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSENot required for events <= 1 hr Not required for events <= 1 hrTOTAL 0Unplanned events greater than 1 hourDATE TIME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSESee Attachments See AttachmentsTOTAL0Planned events less than or equal to 1 hourDATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSENot required for events <= 1 hr Not required for events <= 1 hrTOTAL0Planned events greater than 1 hourDATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE6/15/2021 1035:1153 8,524 See Attachments See AttachmentsTOTAL8,524 TOTALUnplanned Events < 1 Hour 0Unplanned Events > 1 Hour 0Planned Events < 1 hour and not 0exceeding 5,000 MCFPlanned Events > 1 hour or 8,524exceeding 5,000 MCFPilot Purge 35,108Assist 0TOTAL FLARED VOLUME 43,632 2. Facility NamePBU CCP/FFGUPercent100.00%MCF19. Remarks:STATE OF ALASKAALASKA OIL AND GAS CONSERVATION COMMISSIONFACILITY REPORT OF PRODUCED GAS DISPOSITION1. Facility Number 3. Field 4. Operator 5. Month/Year of Disposition0290000000 PBU - EOA HILCORP NORTH SLOPE July-2021Disposition Volume MCF20.For production from multiple pools, list contribution of each pool as a percent ofTotal Volume.6. Sold324,346Pool Name Pool Code7. Reinjected183,197,178PRUDHOE 6401508. Flared or vented 1 hour or less7659. Flared or vented more than 1 hour (see instr.)2010. Pilot and Purge36,12611. Assist Gas013. Other (see instructions)0Official Use OnlyAuthorization >1 hr:SafetyMCF14. TOTAL VOLUME (ITEMS 6-12)189,153,651Lease Use12. Fuel gas used in lease operations.5,595,216DateMCF15. NGL Gas Equivalent0ConservationMCF16. Purchased gas0Waste:17. Transferred from: CGF & FS1189,153,65118. Transferred to: (Express as a negative #)0CommissionerDateBlock 6: Includes Gas Sales to Alyeska Pipeline, Norgasco, Northstar and KRU; Block 12: Includes COTP Non-PBU Fuel Gas = 1,336 mscf; Block18: Fuel Gas to LPC = 0 mscfI hereby certify that the foregoing is true and correct to the best of my knowledge.SignatureTitleNote: All volumes must be correctedto pressure of 14.65 psia and to atemperature of 60o F. Authority 20AAC25.235.Printed NamePhoneForm 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate'65Production AnalystBeth Farouse713-289-26279/22/21JLC 5/6/2022dts 5/6/2022Jeremy PriceDigitally signed by Jeremy Price Date: 2022.05.06 11:56:24 -08'00' HILCORP ALASKAPRUDHOE BAY UNIT - CENTRAL COMPRESSOR PLANTGAS FLARING AND VENTING INCIDENT REPORTJuly 2021Unplanned events less than or equal to 1 hourDATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSENot required for events <= 1 hr Not required for events <= 1 hrTOTAL 0Unplanned events greater than 1 hourDATE TIME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSESee Attachments See AttachmentsTOTAL0Planned events less than or equal to 1 hourDATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE7/1/2021 1340:1345 135 Not required for events <= 1 hr Not required for events <= 1 hr7/1/2021 1742:1747 1357/2/2021 0748:0753 1357/25/2021 0651:0656 1357/25/2021 1224:1229 1357/25/2021 1722:1727 457/25/2021 1801:1806 45TOTAL765Planned events greater than 1 hourDATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE7/30/2021 0304:0442 20 See Attachments See AttachmentsTOTAL20 TOTALUnplanned Events < 1 Hour 0Unplanned Events > 1 Hour 0Planned Events < 1 hour and not 765exceeding 5,000 MCFPlanned Events > 1 hour or 20exceeding 5,000 MCFPilot Purge 36,126Assist 0TOTAL FLARED VOLUME 36,911                !"## $   !             !" "# $%   & '  '$(   "#  %    )*+'  (%"  #             !" ""# $%   & '  '$(   ""#  %    )*+'  (%"  # ,'-. %/0* 12  3     "' '      !"  "4# $%   & '  '$(    "4#  %    )*+'  (%"  # ,'-. %/0* 12       4' 44'      #" # " % & '  '$ 5     "#  % 67 '-& '  '$%"  #       3      #" # " % & '  '$8 5     "#  % 6'  5  (%"  #             #" # "$%   % &'&'%     "#  % 6'  5  (%"  #      4 44      #" # "$%   % &'&'%     "#  % 6'  5  (%"  # ,'-. %/0* 12 4      ' ' 3"     !"  119 ' :#*;  & )*.)0<(0  4(    119 ' :#* % & 4)*+ 6 )*+(%"  # ,'-. %/0* 12   9  ' " =0 )'> &4 2. Facility Name PBU CCP/FFGU Percent 100.00% MCF 19. Remarks: STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 3. Field 4. Operator 5. Month/Year of Disposition 0290000000 PBU - EOA HILCORP NORTH SLOPE August-2021 Disposition Volume MCF 20.For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 383,277 Pool Name Pool Code 7. Reinjected 196,098,623 PRUDHOE 640150 8. Flared or vented 1 hour or less 574 9. Flared or vented more than 1 hour (see instr.)0 10. Pilot and Purge 36,162 11. Assist Gas 0 13. Other (see instructions)0 Official Use Only Authorization >1 hr:Safety MCF 14. TOTAL VOLUME (ITEMS 6-12)202,106,923 Lease Use 12. Fuel gas used in lease operations.5,588,287 Date MCF 15. NGL Gas Equivalent 0 Conservation MCF 16. Purchased gas 0 Waste: 17. Transferred from: CGF & FS1 202,106,923 18. Transferred to: (Express as a negative #)0 Commissioner Date Block 6: Includes Gas Sales to Alyeska Pipeline, Norgasco, Northstar and KRU; Block 12: Includes COTP Non-PBU Fuel Gas = 3,829 mscf; Block 18: Fuel Gas to LPC = 0 mscf I hereby certify that the foregoing is true and correct to the best of my knowledge. Signature Title Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60o F. Authority 20 Printed Name Phone AAC25.235. Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate HILCORP ALASKA PRUDHOE BAY UNIT - CENTRAL COMPRESSOR PLANT GAS FLARING AND VENTING INCIDENT REPORT August 2021 Unplanned events less than or equal to 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 8/8/2021 0804:0809 156 Not required for events <= 1 hr Not required for events <= 1 hr TOTAL 156 Unplanned events greater than 1 hour DATE TIME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE See Attachments See Attachments TOTAL 0 Planned events less than or equal to 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 8/10/2021 0144:0149 141 Not required for events <= 1 hr Not required for events <= 1 hr 8/23/2021 1330:1335 51 8/23/2021 1530:1535 45 8/23/2021 1845:1850 8 8/23/2021 1905:1910 8 8/23/2021 1935:1940 8 8/23/2021 1945:1950 14 8/23/2021 2035:2040 143 TOTAL 418 Planned events greater than 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE See Attachments See Attachments TOTAL 0 TOTAL Unplanned Events < 1 Hour 156 Unplanned Events > 1 Hour 0 Planned Events < 1 hour and not 418 exceeding 5,000 MCF Planned Events > 1 hour or 0 exceeding 5,000 MCF Pilot Purge 36,162 Assist 0 TOTAL FLARED VOLUME 36,736 2. Facility Name PBU CCP/FFGU Percent 100.00% MCF 19. Remarks: STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 3. Field 4. Operator 5. Month/Year of Disposition 0290000000 PBU - EOA HILCORP NORTH SLOPE, ALASKA September-2021 Disposition Volume MCF 20.For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 987,082 Pool Name Pool Code 7. Reinjected 200,497,097 PRUDHOE 640150 8. Flared or vented 1 hour or less 149 9. Flared or vented more than 1 hour (see instr.)0 10. Pilot and Purge 34,971 11. Assist Gas 0 13. Other (see instructions)0 Official Use Only Authorization >1 hr:Safety MCF 14. TOTAL VOLUME (ITEMS 6-12)207,407,316 Lease Use 12. Fuel gas used in lease operations.5,888,017 Date MCF 15. NGL Gas Equivalent 0 Conservation MCF 16. Purchased gas 0 Waste: 17. Transferred from: CGF & FS1 207,407,316 18. Transferred to: (Express as a negative #)0 Commissioner Date Block 6: Includes Gas Sales to Alyeska Pipeline, Norgasco, Northstar and KRU; Block 12: Includes COTP Non-PBU Fuel Gas = 1,944 mscf; Block 18: Fuel Gas to LPC = 0 mscf I hereby certify that the foregoing is true and correct to the best of my knowledge. Signature Title Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60o F. Authority 20 AAC25.235.Printed Name Phone Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate HILCORP ALASKA PRUDHOE BAY UNIT - CENTRAL COMPRESSOR PLANT GAS FLARING AND VENTING INCIDENT REPORT September 2021 Unplanned events less than or equal to 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE Not required for events <= 1 hr Not required for events <= 1 hr TOTAL 0 Unplanned events greater than 1 hour DATE TIME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE See Attachments See Attachments TOTAL 0 Planned events less than or equal to 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 9/10/2021 09:30-09:35 135 Not required for events <= 1 hr Not required for events <= 1 hr 9/10/2021 13:00-13:05 14 TOTAL 149 Planned events greater than 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE See Attachments See Attachments TOTAL 0 TOTAL Unplanned Events < 1 Hour 0 Unplanned Events > 1 Hour 0 Planned Events < 1 hour and not 149 exceeding 5,000 MCF Planned Events > 1 hour or 0 exceeding 5,000 MCF Pilot Purge 34,971 Assist 0 TOTAL FLARED VOLUME 35,120 2. Facility Name PBU CCP/FFGU Percent 100.00% MCF 19. Remarks: 0 Commissioner Date Block 6: Includes Gas Sales to Alyeska Pipeline, Norgasco, Northstar and KRU; Block 12: Includes COTP Non-PBU Fuel Gas = 3,029 mscf; Block 18: Fuel Gas to LPC = 0 mscf I hereby certify that the foregoing is true and correct to the best of my knowledge. Signature Title Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60o F. Authority 20 AAC25.235.Printed Name Phone 12. Fuel gas used in lease operations.6,087,745 Date MCF 15. NGL Gas Equivalent 0 Conservation MCF 16. Purchased gas 0 Waste: 17. Transferred from: CGF & FS1 213,011,858 18. Transferred to: (Express as a negative #) 13. Other (see instructions)0 Official Use Only Authorization >1 hr:Safety MCF 14. TOTAL VOLUME (ITEMS 6-12)213,011,858 Lease Use 11. Assist Gas 0 9. Flared or vented more than 1 hour (see instr.)0 10. Pilot and Purge 36,120 8. Flared or vented 1 hour or less 4,992 0290000000 PBU - EOA HILCORP NORTH SLOPE October-2021 Disposition Volume MCF 20.For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 1,421,192 Pool Name Pool Code 7. Reinjected 205,461,809 PRUDHOE 640150 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 3. Field 4. Operator 5. Month/Year of Disposition Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate HILCORP ALASKA PRUDHOE BAY UNIT - CENTRAL COMPRESSOR PLANT GAS FLARING AND VENTING INCIDENT REPORT October 2021 Unplanned events less than or equal to 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 10/5/2021 1638:1643 109 Not required for events <= 1 hr Not required for events <= 1 hr 10/18/2021 1400:1405 14 10/20/2021 1400:1405 109 10/21/2021 0730:0735 135 10/21/2021 0812:0817 8 10/21/2021 1735:1740 8 10/21/2021 1756:1801 8 10/23/2021 1847:1852 135 10/24/2021 2241:2246 8 10/27/2021 1758:1803 8 10/29/2021 1016:1021 109 TOTAL 651 Unplanned events greater than 1 hour DATE TIME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE See Attachments See Attachments TOTAL 0 Planned events less than or equal to 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 10/5/2021 0308:0313 420 Not required for events <= 1 hr Not required for events <= 1 hr 10/5/2021 1535:1540 408 10/18/2021 1301:1306 135 10/20/2021 0300:0305 135 10/20/2021 0515:0520 14 10/20/2021 0530:0535 156 10/20/2021 0856:0901 8 10/20/2021 1237:1242 408 10/20/2021 1715:1720 156 10/20/2021 1923:1928 11 10/21/2021 0220:0225 135 10/21/2021 0450:0455 14 10/21/2021 2040:2045 135 10/21/2021 2135:2145 14 10/22/2021 0034:0039 11 10/22/2021 0219:0224 156 10/22/2021 0440:0445 11 10/22/2021 1321:1326 135 10/22/2021 1524:1529 14 10/23/2021 2212:22:17 135 10/24/2021 0032:0037 14 10/24/2021 0523:0528 135 10/24/2021 0743:0801 14 10/24/2021 2310:2315 8 10/25/2021 0114:0119 156 10/25/2021 0347:0352 8 10/25/2021 2043:2048 8 10/26/2021 2151:2156 135 10/27/2021 0019:0024 14 10/27/2021 2318:2323 135 10/28/2021 0136:0141 14 10/29/2021 0921:0926 408 10/29/2021 0958:1003 109 10/29/2021 1405:1410 420 10/29/2021 1723:1728 152 TOTAL 4,341 Planned events greater than 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE See Attachments See Attachments TOTAL 0 TOTAL Unplanned Events < 1 Hour 651 Unplanned Events > 1 Hour 0 Planned Events < 1 hour and not 4,341 exceeding 5,000 MCF Planned Events > 1 hour or 0 exceeding 5,000 MCF Pilot Purge 36,120 Assist 0 TOTAL FLARED VOLUME 41,112 2. Facility Name PBU CCP/FFGU Percent 100.00% MCF 19. Remarks: STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 3. Field 4. Operator 5. Month/Year of Disposition 0290000000 PBU - EOA Hilcorp North Slope November-2021 Disposition Volume MCF 20.For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 1,664,992 Pool Name Pool Code 7. Reinjected 222,008,673 PRUDHOE 640150 8. Flared or vented 1 hour or less 410 9. Flared or vented more than 1 hour (see instr.)0 10. Pilot and Purge 35,116 11. Assist Gas 0 13. Other (see instructions)0 Official Use Only Authorization >1 hr:Safety MCF 14. TOTAL VOLUME (ITEMS 6-12)229,822,450 Lease Use 12. Fuel gas used in lease operations.6,113,259 Date MCF 15. NGL Gas Equivalent 0 Conservation MCF 16. Purchased gas 0 Waste: 17. Transferred from: CGF & FS1 229,822,450 18. Transferred to: (Express as a negative #)0 Commissioner Date Block 6: Includes Gas Sales to Alyeska Pipeline, Norgasco, Northstar and KRU; Block 12: Includes COTP Non-PBU Fuel Gas = 827 mscf; Block 18: Fuel Gas to LPC = 0 mscf I hereby certify that the foregoing is true and correct to the best of my knowledge. Signature Title Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60o F. Authority 20 AAC25.235.Printed Name Phone Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate HILCORP ALASKA PRUDHOE BAY UNIT - CENTRAL COMPRESSOR PLANT GAS FLARING AND VENTING INCIDENT REPORT November 2021 Unplanned events less than or equal to 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE Not required for events <= 1 hr Not required for events <= 1 hr TOTAL 0 Unplanned events greater than 1 hour DATE TIME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE See Attachments See Attachments TOTAL 0 Planned events less than or equal to 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 11/7/2021 0945:0950 152 Not required for events <= 1 hr Not required for events <= 1 hr 11/7/2021 1125:1130 109 11/13/2021 0030:0035 135 11/13/2021 0230:0235 14 TOTAL 410 Planned events greater than 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE See Attachments See Attachments TOTAL 0 TOTAL Unplanned Events < 1 Hour 0 Unplanned Events > 1 Hour 0 Planned Events < 1 hour and not 410 exceeding 5,000 MCF Planned Events > 1 hour or 0 exceeding 5,000 MCF Pilot Purge 35,116 Assist 0 TOTAL FLARED VOLUME 35,526 2. Facility Name PBU CCP/FFGU Percent 100.00% Safety MCF Lease MCF MCF Waste MCF Reviewed by: Comm.Comm. 19. Remarks: Authorized Name and Digital Signature with date: Beth Farouse 1/31/2022 COMMISSIONER I hereby certify that the foregoing is true and correct to the best of my knowledge. Revision?Date of Revision: Contact Phone:(713)289-2627 Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60° F. Authority 20 AAC 25.235.Beth Farouse Contact Email:bfarouse@hilcorp.com 0 Block 6: Includes Gas Sales to Alyeska Pipeline, Norgasco, Northstar and KRU; Block 12: Includes COTP Non-PBU Fuel Gas = 797 mscf; Block 18: Fuel Gas to LPC = 0 mscf Title:Production Analyst 12. Fuel gas used in lease operations.6,701,413 15. NGL Gas Equivalent 0 16. Purchased gas 0 17. Transferred from: CGF & FS1 246,537,975 18. Transferred to: (Express as a negative #) 13. Other (see instructions)0 Official Use Only 14. TOTAL VOLUME (ITEMS 6-12)246,537,975 Authorization >1 hr: Conservation 11. Assist Gas 0 9. Flared or vented more than 1 hour (see instr.)0 10. Pilot and Purge 36,248 8. Flared or vented 1 hour or less 419 0290000000 PBU - EOA Hilcorp December-2021 Disposition Volume MCF 20.For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 1,689,991 Pool Name Pool Code 7. Reinjected 238,109,904 PRUDHOE 640150 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 3. Field 4. Operator 5. Month/Year of Disposition Form 10-422 Revised 10/2021 20 ACC 25.235 Submit in PDF format to aogcc.reporting@alaska.gov HILCORP ALASKA PRUDHOE BAY UNIT - CENTRAL COMPRESSOR PLANT GAS FLARING AND VENTING INCIDENT REPORT December 2021 Unplanned events less than or equal to 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 12/3/2021 0717:0722 135 Not required for events <= 1 hr Not required for events <= 1 hr 12/3/2021 0851:0856 15 12/3/2021 1509:1514 8 12/25/2021 0450:0455 109 TOTAL 267 Unplanned events greater than 1 hour DATE TIME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE See Attachments See Attachments TOTAL 0 Planned events less than or equal to 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE 12/25/2021 0740:0745 152 Not required for events <= 1 hr Not required for events <= 1 hr TOTAL 152 Planned events greater than 1 hour DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE See Attachments See Attachments TOTAL 0 TOTAL Unplanned Events < 1 Hour 267 Unplanned Events > 1 Hour 0 Planned Events < 1 hour and not 152 exceeding 5,000 MCF Planned Events > 1 hour or 0 exceeding 5,000 MCF Pilot Purge 36,248 Assist 0 TOTAL FLARED VOLUME 36,667