Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAbout212-1791. Type of Request: Abandon Plug Perforations Fracture Stimulate Repair Well Operations shutdown
Suspend Perforate Other Stimulate Pull Tubing Change Approved Program
Plug for Redrill Perforate New Pool Re-enter Susp Well Alter Casing Other: ESP Swap
2. Operator Name: 4. Current Well Class: 5. Permit to Drill Number:
Exploratory Development
3. Address: Stratigraphic Service
6. API Number:
7. If perforating:8. Well Name and Number:
What Regulation or Conservation Order governs well spacing in this pool?
Yes No
9. Property Designation (Lease Number): 10. Field:
11.
Total Depth MD (ft): Total Depth TVD (ft): Effective Depth MD: Effective Depth TVD: Junk (MD):
21,230 NA
Casing Collapse
Conductor NA
Surface 2,260psi
Intermediate 3,090psi
Slotted Liner NA
Packers and SSSV Type: Packers and SSSV MD (ft) and TVD (ft):
12. Attachments: Proposal Summary Wellbore schematic 13. Well Class after proposed work:
Detailed Operations Program BOP Sketch Exploratory Stratigraphic Development Service
14. Estimated Date for 15. Well Status after proposed work:
Commencing Operations: OIL WINJ WDSPL Suspended
16. Verbal Approval: Date: GAS WAG GSTOR SPLUG
AOGCC Representative: GINJ Op Shutdown Abandoned
Contact Name:
Contact Email:
Contact Phone:
Authorized Title:
Conditions of approval: Notify AOGCC so that a representative may witness Sundry Number:
Plug Integrity BOP Test Mechanical Integrity Test Location Clearance
Other Conditions of Approval:
Post Initial Injection MIT Req'd? Yes No
APPROVED BY
Approved by: COMMISSIONER THE AOGCC Date:
Comm. Comm. Sr Pet Eng Sr Pet Geo Sr Res Eng
NIKAITCHUQ
SLXP Liner Hanger Packer, 5 oil swell packers, and NA 11,764' MD/3,975' TVD, see schematic for swell packers, and NA
20,617
20,674'
Slotted Liner
907-777-8438
keith.lopez@hilcorp.com
Operations Manager
August 1, 2025
4-1/2"
Perforation Depth MD (ft):
Slotted Liner
160' 20"
13-3/8"
9-5/8"
3,909'
5-1/2"8,911'
11,889'
5,020psi
5,750psi
2,452'
3,997'
3,910'
3,909'
11,889'
160' 160'
12.25# / L-80
TVD Burst
10,918'
MD
NA
NA
Hilcorp Alaska, LLC
Length Size
Proposed Pools:
3,733 20,617 3,918 1,003
SCHRADER BLUFF OIL SCHRADER BLUFF OIL
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
APPLICATION FOR SUNDRY APPROVALS
20 AAC 25.280
ADL0388571, ADL0388581, ADL0388583, ADL0391283
212-179
C.O. 639 NIKAITCHUQ SP05-FN07
3800 Centerpoint Dr, Suite 1400 Anchorage, AK 99503 50-629-23481-00-00
PRESENT WELL CONDITION SUMMARY
AOGCC USE ONLY
Tubing Grade: Tubing MD (ft):Perforation Depth TVD (ft):
Keith Lopez
Subsequent Form Required:
Suspension Expiration Date:
Will perfs require a spacing exception due to property boundaries?
Current Pools:
MPSP (psi): Plugs (MD):
17. I hereby certify that the foregoing is true and the procedure approved herein will not be deviated from without prior written approval.
Authorized Name and
Digital Signature with Date:
Tubing Size:
Form 10-403 Revised 06/2023 Approved application valid for 12 months from date of approval.Submit PDF to aogcc.permitting@alaska.gov
By Grace Christianson at 9:32 am, Jun 25, 2025
Digitally signed by Sara
Hannegan (2519)
DN: cn=Sara Hannegan (2519)
Date: 2025.06.24 14:53:02 -
08'00'
Sara Hannegan
(2519)
325-381
10-404
MGR14JULY25 SFD 7/22/2025
CO 477B SFD
DSR-6/30/25
* Initial BOPE pressure test to rated working pressure of BOPE to 5000 psi. Annular to 2500.
* Subsequent BOPE pressure tests to 2500 psi.
JLC 7/23/2025
Gregory C. Wilson Digitally signed by Gregory C. Wilson
Date: 2025.07.23 14:47:09 -08'00'
07/23/25
RBDMS JSB 072425
Well: SP-05
PTD: 212-179
API: 50-629-23481-00-00
Well Name:SP-05 API Number:50-629-23481-00-00
Current Status:Producer Rig:Team Snubbing 101
Estimated Start Date:08/01/2025 Estimated Duration:8days
Regulatory Contact:Darci Horner Permit to Drill Number:212-179
First Call Engineer:Keith Lopez (907) 777-8438 (O) (907) 903-5432 (M)
Second Call Engineer:Ryan Rupert (907) 777-8503 (O) (907) 301-1736 (M)
Current Bottom Hole Pressure: 1,400 psi @ 3,975’ TVD |6.8 PPGE
Max Potential Surface Pressure: 1,003 psi Gas Column Gradient (0.1 psi/ft)
Max Angle: 78° Sail Angle from 3,024’ MD to ESP setting depth of 10,900’ MD
Brief Well Summary:
SP05 was drilled and completed in January 2013 as a Schrader Bluff OA producer with an TTCESP completion.
This well has had 2 TTCESP completions and the current ESP is the 3 rd conventional ESP run. The current ESP
ran for 4.2 years before grounding out on 05/16/2025.
Objectives:
Pull ESP completion and run new ESP completion.
Notes Regarding Wellbore Condition:
x OAxIA communication was discovered when attempting to kill the well on 08/30/2018. An expandable
casing patch was set at 2,265-2,285 and pressure tested from 11,700’ to 1,500 psi for 30 minutes on
11/24/18.
x Casing was tested from 2,197’ to surface to 1,500 psi for 30 minutes on 02/15/21.
HWO Conditions
x Traditional well control approach will be implemented.
x KWF will be a barrier at all times during HWO operations.
x No snubbing operations are planned during this work.
x Team Snubbing’s BOP stack will be used for this operation (see attachment).
Pre-Rig Procedure (Non Sundried Work)
Operations:
1. Bleed off gas cap from IA before the rig move to the well.
HWO Procedure (Begin Sundried Work)
1. MIRU Team Snubbing Hydraulic Workover (HWO) Unit 101, ancillary equipment, and lines.
2. Displace corrosion inhibitor from capillary line prior to pulling ESP.
3. Kill well by bullheading the tubing string and the IA with injection water.
a. Tubing volume 165 bbls.
b. Annulus volume 678 bbls.
c. Monitor OA annulus during kill.
Well: SP-05
PTD: 212-179
API: 50-629-23481-00-00
4. Flow check for 30 min to ensure the well is killed.
5. Install BPV/TWC inside tubing hanger as per Vault.
6. Nipple up BOP.
7. Conduct BOP Test.
a. Notify AOGCC 48 hours in advance for witness
b. Test to 250psi Low /2,500psi High / 2,500psi Annular
c. BOPE will be used as needed to circulate the well
8. Pull BPV/TWC from the tubing hanger per Vault procedure.
9. Call out ESP Contractor to pull ESP and pull tubing hanger.
10. RU tubing handling equipment.
11. Pump approximately 10 bbl/hour (+ pipe displacement while pulling pipe) of injection water down
the annulus throughout the operations to maintain well fill.
12. POOH with 4-1/2” ESP completion laying down tubing and ESP. Record number of clamps
recovered.
13. RIH with ESP completion on either 3-1/2” or 4-1/2” tubing to +/- 10,925’.
a. Check electrical continuity every 1000’.
b. Note PU and SO weights on tally.
14. Land tubing hanger. Use extra caution to not damage cable.
15. Lay down landing joint.
16. Set BPV/TWC, ND BOP.
17. NU tree and test, pull BPV/TWC.
18. RDMO TS HWO 101.
Attachments:
1. Current Wellbore Schematic
2. Proposed Wellbore Schematic
3. Snubbing BOP diagram (TSI)
4. HWO Fluid Flow Diagrams (TSI)
5. Snubbing stack stabilization diagram (TSI)
* Initial BOPE test to rated working pressure of equipment. 5000 psi. - mgr
4-½” 12.6 ppf L80 W563 Production TubingHAL 5-½” Oil SwellPackerSP12-SE3Dual Lateral Producerwith ESP LiftNikaitchuq Field –Spy IslandAs completedNovember 24th 20194,917' MD, 3,923'TVD – L1 - BakerSLXP LinerHanger/Packer4,992'-5,009' MD,3,943'-3,946' TVDCasing Exit Window4-½” X-Coupling Cable Protector for ES Power Cable, (1) 3/8" ChemicalInjection Line with 5K psi check valve at bottom4,657' MD, 3,815' TVD, 63º Inc – Bottom of Motor Centralizer Centrilift,66 stages 538PMSXD Flex + 20 stages 538PMSXD GINPSHH ESP Pump,GSB3DB seals, 250HP Motor 562XP, Zenith AL-PT00752 SensorSurf. Casing13-3/8", 68 #2,878' MD,2,463' TVD19º Inc. Interm. Casing9-5/8", 40#5,193' MD, 3,980' TVD83º Inc.5,053' MD, 3,957' TVDBaker MLXP LinerHanger/PackerTD 8 3/4”15,216 MD,4,063' TVD 90º Inc.5-½” 15.5 ppf L80Slotted LinerSilver Bullet Ecc. Nose Guide Shoe 15,205' MD, 4,063' TVD, 90º Inc.Silver Bullet Ecc. NoseGuide Closed Shoe 15,200' MD, 4,050' TVD,90º Inc.TD 8 3/4”15,245' MD,4,050' TVD90º Inc.5-½” 15.5/17 ppfL80 Slotted LinerItem MD (ft)Swell Packer #1 13,947Swell Packer #2 12,462Swell Packer #3 10,992Swell Packer #4 9,570Swell Packer #5 7,948Swell Packer #6 6,614Swell Packer #7 5,478Sealbore Receptacle4.75" ID4,981' MD RAM Hanger4-½” x 9-5/8" RAMSeal Bore Diverterw/ 3.68" Seal BoreBottom of SealAssembly4 ½” Lateral EntryModule (LEM) w/ 3.68Seal Bore3.65" Lateral Drift ID3.63" Mainbore Drift IDTOC 9 5/8", 3746'MD, 3257' TVD39' MD/TVD Fast Swivel joint4" ½ 12.6ppf 13Cr L80 W563Doyon 15 RKB 31.80'Date Activity7/17/2014Drill and Complete withTTC_ESP3/17/2017Replace TTC-ESP withconventional ESP5/6/2019Replace conventional ESPand run ESPCP11/24/2019Replace failed ESPCP andrun conventional ESPWell History
3-½” or 4-½” Production TubingHAL 5-½” Oil SwellPackerSP12-SE3Dual Lateral Producerwith ESP LiftNikaitchuq Field –Spy IslandProposedJun 20254,917' MD, 3,923'TVD – L1 - BakerSLXP LinerHanger/Packer4,992'-5,009' MD,3,943'-3,946' TVDCasing Exit Window(2) 3/8" Chemical Injection Lines~4,657' MD, 3,815' TVD, 63º Inc – Bottom of Motor CentralizerSurf. Casing13-3/8", 68 #2,878' MD,2,463' TVD19º Inc. Interm. Casing9-5/8", 40#5,193' MD, 3,980' TVD83º Inc.5,053' MD, 3,957' TVDBaker MLXP LinerHanger/PackerTD 8 3/4”15,216 MD,4,063' TVD 90º Inc.5-½” 15.5 ppf L80Slotted LinerSilver Bullet Ecc. Nose Guide Shoe 15,205' MD, 4,063' TVD, 90º Inc.Silver Bullet Ecc. NoseGuide Closed Shoe 15,200' MD, 4,050' TVD,90º Inc.TD 8 3/4”15,245' MD,4,050' TVD90º Inc.5-½” 15.5/17 ppfL80 Slotted LinerItem MD (ft)Swell Packer #1 13,947Swell Packer #2 12,462Swell Packer #3 10,992Swell Packer #4 9,570Swell Packer #5 7,948Swell Packer #6 6,614Swell Packer #7 5,478Sealbore Receptacle4.75" ID4,981' MD RAM Hanger4-½” x 9-5/8" RAMSeal Bore Diverterw/ 3.68" Seal BoreBottom of SealAssembly4 ½” Lateral EntryModule (LEM) w/ 3.68Seal Bore3.65" Lateral Drift ID3.63" Mainbore Drift IDTOC 9 5/8", 3746'MD, 3257' TVDDoyon 15 RKB 31.80'Date Activity7/17/2014Drill and Complete withTTC_ESP3/17/2017Replace TTC-ESP withconventional ESP5/6/2019Replace conventional ESPand run ESPCP11/24/2019Replace failed ESPCP andrun conventional ESPWell History
1. Type of Request: Abandon Plug Perforations Fracture Stimulate Repair Well Operations shutdown
Suspend Perforate Other Stimulate Pull Tubing Change Approved Program
Plug for Redrill Perforate New Pool Re-enter Susp Well Alter Casing Other: ESP Swap
2.Operator Name: 4.Current Well Class:5.Permit to Drill Number:
Exploratory Development
3. Address:Stratigraphic Service
6. API Number:
7. If perforating:8.Well Name and Number:
What Regulation or Conservation Order governs well spacing in this pool?
Yes No
9.Property Designation (Lease Number):10. Field:
11.
Total Depth MD (ft): Total Depth TVD (ft): Effective Depth MD: Effective Depth TVD: Junk (MD):
21,230 NA
Casing Collapse
Conductor NA
Surface 2,260psi
Intermediate 3,090psi
Slotted Liner NA
Packers and SSSV Type: Packers and SSSV MD (ft) and TVD (ft):
12. Attachments: Proposal Summary Wellbore schematic 13.Well Class after proposed work:
Detailed Operations Program BOP Sketch Exploratory Stratigraphic Development Service
14.Estimated Date for 15.Well Status after proposed work:
Commencing Operations: OIL WINJ WDSPL Suspended
16. Verbal Approval: Date: GAS WAG GSTOR SPLUG
AOGCC Representative: GINJ Op Shutdown Abandoned
Contact Name:
Contact Email:
Contact Phone:
Authorized Title:
Conditions of approval: Notify AOGCC so that a representative may witness Sundry Number:
Plug Integrity BOP Test Mechanical Integrity Test Location Clearance
Other Conditions of Approval:
Post Initial Injection MIT Req'd? Yes No
APPROVED BY
Approved by: COMMISSIONER THE AOGCC Date:
Comm. Comm. Sr Pet Eng Sr Pet Geo Sr Res Eng
Keith Lopez
Subsequent Form Required:
Suspension Expiration Date:
Will perfs require a spacing exception due to property boundaries?
Current Pools:
MPSP (psi): Plugs (MD):
17. I hereby certify that the foregoing is true and the procedure approved herein will not be deviated from without prior written approval.
Authorized Name and
Digital Signature with Date:
Tubing Size:
PRESENT WELL CONDITION SUMMARY
AOGCC USE ONLY
Tubing Grade: Tubing MD (ft):Perforation Depth TVD (ft):
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
APPLICATION FOR SUNDRY APPROVALS
20 AAC 25.280
ADL0388571, ADL0388581, ADL0388583, ADL0391283
212-179
C.O. 639 NIKAITCHUQ SP05-FN07
3800 Centerpoint Dr, Suite 1400 Anchorage, AK 99503 50-629-23481-00-00
Hilcorp Alaska, LLC
Length Size
Proposed Pools:
3,733 20,617 3,918 1,003
SCHRADER BLUFF OIL SCHRADER BLUFF OIL
160' 160'
12.25# / L-80
TVD Burst
10,918'
MD
NA
NA
11,889'
5,020psi
5,750psi
2,452'
3,997'
3,910'
3,909'
11,889'
Slotted Liner
160' 20"
13-3/8"
9-5/8"
3,909'
5-1/2"8,911'
Slotted Liner
907-777-8438
keith.lopez@hilcorp.com
Operations Manager
January 1, 2025
4-1/2"
Perforation Depth MD (ft):
NIKAITCHUQ
SLXP Liner Hanger Packer, 5 oil swell packers, and NA 11,764' MD/3,975' TVD, see schematic for swell packers, and NA
20,617
20,674'
Form 10-403 Revised 06/2023 Approved application valid for 12 months from date of approval.Submit PDF to aogcc.permitting@alaska.gov
By Grace Christianson at 4:16 pm, Nov 25, 2024
Digitally signed by Sara
Hannegan (2519)
DN: cn=Sara Hannegan (2519)
Date: 2024.11.25 14:40:15 -
09'00'
Sara Hannegan
(2519)
324-670
Witnessed BOP Test to 3500 psi, Annular Test to 2500 psi.
X
10-404
A.Dewhurst 26NOV24 DSR-12/16/24JJL 12/03/24*&:
Jessie L.
Chmielowski
Digitally signed by Jessie L.
Chmielowski
Date: 2024.12.17 11:24:37 -09'00'12/17/24
RBDMS JSB 121924
Well: SP-05
PTD: 212-179
API: 50-629-23481-00-00
Well Name:SP-05 API Number:50-629-23481-00-00
Current Status:Producer Rig:Doyon 15
Estimated Start Date:01/01/2025 Estimated Duration:9 days
Regulatory Contact:Darci Horner Permit to Drill Number:212-179
First Call Engineer:Keith Lopez (907) 777-8438 (O) (907) 903-5432 (M)
Second Call Engineer:Sara Hannegan (907) 564-4624 (O) (907) 309-1196 (M)
Current Bottom Hole Pressure: 1,400 psi @ 3,975’ TVD |6.8 PPGE
Max Potential Surface Pressure: 1,003 psi Gas Column Gradient (0.1 psi/ft)
Max Angle: 78° Sail Angle from 3,024’ MD to ESP setting depth of 10,900’ MD
Brief Well Summary:
SP05 was drilled and completed in January 2013 as a Schrader Bluff OA producer with an ESP completion. The
current ESP ran for 3.5 years before grounding out on 9/20/2024.
Objectives:
Pull ESP completion, run VAC tool to remove sand from ESP setting depth and 1,800’ into liner top, run new ESP
completion.
Notes Regarding Wellbore Condition:
x Expandable casing patch installed @ 2,265’ installed in November 2018.
x Casing test above the casing patch @ 2,265’ to 1,500 psi passed 2/15/2021.
Pre-Rig Procedure (Non Sundried Work)
Operations:
1. Bleed off gas cap from IA before the rig move to the well
Brief RWO Procedure (Begin Sundried Work)
1. MIRU Doyon 15 WO Rig, ancillary equipment, and lines.
2. Displace corrosion inhibitor from capillary line prior to pulling ESP.
3. Kill well by bullheading the tubing string and the IA.
a. Pump 130% tubing volume (214 bbls) of injection water inhibited with biocide.
b. Pump 130% annulus volume (800 bbls) of injection water inhibited with biocide.
c. Monitor OA annulus during kill.
4. Flow check for 30 min to ensure the well is killed.
5. Install BPV inside tubing hanger as per Vault.
6. Nipple down X-mas tree.
7. Make up blanking plug on top of tubing hanger as per Vault procedure.
8. Nipple up BOP.
9. Run 4-1/2”, and 2-7/8” test joint and engage tubing hanger blanking plug.
a. Perform full BOP pressure test to 250/3,500 psi (notify AOGCC 48 hours prior to BOP test).
Submit to AOGCC completed 10-424 form within 5 days of BOPE test.
10. Pull 4-1/2” test joint with blanking plug.
Well: SP-05
PTD: 212-179
API: 50-629-23481-00-00
11. Pull BPV from the tubing hanger per Vault procedure.
12. Call out Centrilift to pull ESP and pull tubing hanger.
13. RU tubing handling equipment.
14. Pump approximately 10 bbl/hour (+ pipe displacement while pulling pipe) of 8.6 ppg 3% KCl/NaCl
brine down the annulus throughout the operations to maintain well fill.
15. POOH with 4-1/2” ESP completion standing back tubing and laying down ESP. Record number of
clamps recovered.
16. PU 4-1/2” work string (tubing pulled from SP33) and RIH with Cleanout/VACS assembly as outlined
below:
17. RIH to 50’ above the top of liner and mark pipe. RIH to top of liner at 30 fpm (roughly 1 min per
joint) using VACS tool.
18. POOH and lay down cleanout/VACS BHA
a. Break down BHA capturing sand in containment. Report amount of sand captured in daily
report. Inspect and empty washpipe and VACS tool.
19. PU and RIH with 5-1/2” liner cleanout assembly as outlined below:
Well: SP-05
PTD: 212-179
API: 50-629-23481-00-00
20. RIH until BHA is approximately 30’ above liner top. Break circulation and record working
parameters of VACS.
21. Slowly wash down into liner top and while maintaining operating parameters of the VACS. Wash
down till snorkel pipe is 1,800’ into the liner.
22. POOH with VACS cleanout BHA laying down 2-7/8” snorkel pipe and 4-1/2” work string.
a. Break down BHA capturing sand in containment. Report amount of sand captured in daily
report. Inspect and empty washpipe and VACS tool.
23. Call Operations Engineer after each cleanout run to discuss sand returns.
24. RIH with 4-1/2” 12.6# L-80 TK-15XT and ESP completion w/ motor shroud to +/- 10,925’ with duel
encapsulated capillary strings.
a. Check electrical continuity every 1000’.
b. Note PU and SO weights on tally.
c. Install ESP clamps per Baker, and cross coupling clamps every other joint
25. Land tubing hanger. Use extra caution to not damage cable.
26. Lay down landing joint.
27. Set BPV.
28. ND BOPE and NU tree.
29. Test tubing hanger void to 500 psi low/5,000 psi high. Pull BPV.
30. RDMO Doyon 15.
Attachments:
1. Current Wellbore Schematic
2. Proposed Wellbore Schematic
3.BOPE Schematic
Surf. Casing13-3/8", 68 # 3,909'MD, 2,452' TVD78º Inc. Interm. Casing9-5/8", 40#11,889' MD, 3,997' TVD84º Inc.4-½” 12.6# L80 TK-15XT (InternallyCoated) Hydril 563 Production TubingSlotted Liner,5-½” 15.5 ppfHAL 5-½” Oil SwellPacker4-½” x-cplg cable clamps, for ESPPower Cable, (1) 3/8" Chem Inj Linewith 2500 psi check valve at bottomSP05-FN7Oil Producer withESP LiftNikaitchuq Field –Spy Island 11,764' MD, 3,975' TVD - Baker SLXP Liner Hanger/Packer5-½” Silver Bullet Ecc.Nose Guide Shoe20,675' MD, 3,910'TVD 97º INC.As CompletedFeb-18 202110,918' MD, 3,838' TVD, 79º Inc – Bottom of Motor Centralizer Centrilift, ESP, 66 StageFLEX 47 SXD, 20 stage GINPSHH 538 PMSXD, 225 HP 562XP Motor10,925' MD (3,839' TVD), 79º Inc. 7-5/8" Shroud Assembly,cable and chemical injection line feed-thruItem MD (ft)5-1/2" Swell Pkr #1 205585-1/2" Swell Pkr #2 198565-1/2" Swell Pkr #3 179825-1/2" Swell Pkr #4 162455-1/2" Swell Pkr #5 149945-1/2" Swell Pkr #6 13653Top Hanger/Packer20,617 MD,3,918' TVD,97º Inc.Cement SqueezeSaltel internal casing patchID 7.95"top 2,265.49' and bottom 2,284.51'MD (1931.6' to 1944' TVD)(maximum external pressure rating ofthe patch is 1,130 psi)10,851' MD, 3825' TVD, 79º Inc – DGUDate Activity1/23/2013Drill and Complete with TTC-ESP main wellbore & L12/28/2014 CT TTC-ESP pump swap5/11/2014Clean wellbore and replaceTTC-ESP with new TTC-ESP12/28/2014Replace TTC-ESP with new TTC-ESP5/6/2016Swap TTC-ESP withconventional ESP system11/30/2018Set 9-5/8" casing patch, swapESP system2/18/2021 ESP SwapWell History
Surf. Casing13-3/8", 68 # 3,909'MD, 2,452' TVD78º Inc. Interm. Casing9-5/8", 40#11,889' MD, 3,997' TVD84º Inc.4-½” 12.6# L80 ProductionTubingSlotted Liner,5-½” 15.5 ppfHAL 5-½” Oil SwellPacker4-½” x-cplg cable clamps, for ESPPower Cable, (2) 3/8" Chem Inj Linewith 2500 psi check valve at bottomSP05-FN7Oil Producer withESP LiftNikaitchuq Field –Spy Island 11,764' MD, 3,975' TVD - Baker SLXP Liner Hanger/Packer5-½” Silver Bullet Ecc.Nose Guide Shoe20,675' MD, 3,910'TVD 97º INC.Proposed Nov2024~10,918' MD, ~3,838' TVD, 79º Inc – Bottom of Motor Centralizer Centrilift ESP~10,925' MD (~3,839' TVD), 79º Inc. 7-5/8" Shroud Assembly,cable and chemical injection line feed-thruItem MD (ft)5-1/2" Swell Pkr #1 205585-1/2" Swell Pkr #2 198565-1/2" Swell Pkr #3 179825-1/2" Swell Pkr #4 162455-1/2" Swell Pkr #5 149945-1/2" Swell Pkr #6 13653Top Hanger/Packer20,617 MD,3,918' TVD,97º Inc.Cement SqueezeSaltel internal casing patchID 7.95"top 2,265.49' and bottom 2,284.51'MD (1931.6' to 1944' TVD)(maximum external pressure rating ofthe patch is 1,130 psi)~10,851' MD, ~3825' TVD, 79º Inc – DGUDate Activity1/23/2013Drill and Complete with TTC-ESP main wellbore & L12/28/2014 CT TTC-ESP pump swap5/11/2014Clean wellbore and replaceTTC-ESP with new TTC-ESP12/28/2014Replace TTC-ESP with new TTC-ESP5/6/2016Swap TTC-ESP withconventional ESP system11/30/2018Set 9-5/8" casing patch, swapESP system2/18/2021 ESP SwapWell History
By Samantha Carlisle at 9:45 am, Mar 10, 2021
DSR-3/10/21 SFD 3/16/2021VTL 5/5/21
RBDMS HEW 3/10/2021
Surf. Casing13-3/8", 68 # 3,909' MD, 2,452' TVD78º Inc. Interm. Casing 9-5/8", 40#11,889' MD, 3,997' TVD84º Inc.4-½” 12.25 ppf L80 TK-15XT (Internally Coated) Hydril 563 Production Tubing Slotted Liner,5-½” 15.5 ppfHAL 5-½” Oil Swell Packer4-½” x-cplg cable clamps, for ESP Power Cable, (1) 3/8" Chem Inj Line with 2500 psi check valve at bottomSP05-FN7Oil Producer withESP LiftNikaitchuq Field –Spy Island 11,764' MD, 3,975' TVD - Baker SLXP Liner Hanger/Packer5-½” Silver Bullet Ecc. Nose Guide Shoe20,675' MD, 3,910' TVD 97º INC.As CompletedFeb-18 202110,918' MD, 3,838' TVD, 79º Inc – Bottom of Motor Centralizer Centrilift, ESP, 66 Stage FLEX 47 SXD, 20 stage GINPSHH 538 PMSXD, 225 HP 562XP Motor10,925' MD (3,839' TVD), 79º Inc. 7-5/8" Shroud Assembly, cable and chemical injection line feed-thruItem MD (ft)5-1/2" Swell Pkr #1 205585-1/2" Swell Pkr #2 198565-1/2" Swell Pkr #3 179825-1/2" Swell Pkr #4 162455-1/2" Swell Pkr #5 149945-1/2" Swell Pkr #6 13653Top Hanger/Packer20,617 MD,3,918' TVD,97º Inc.Cement SqueezeSaltel internal casing patch ID 7.95" top 2,265.49' and bottom 2,284.51' MD (1931.6' to 1944' TVD) (maximum external pressure rating of the patch is 1,130 psi) 10,851' MD, 3825' TVD, 79º Inc – DGU
:HOO1DPH63)125
:HOOERUH1DPH63)1
:HOO&RGH
-RE:25.29(5
:&(,/(9(/
'DLO\5HSRUW
'DWH
5HSRUW
3DJHRI
:HOO+HDGHU
3HUPLW&RQFHVVLRQ1
$'/
2SHUDWRU
(1,3(752/(80
6XEVLGLDU\
(1,3HWUROHXP&R,QF
,QLWLDO/DKHH&RGH
'(9(/230(17:(//
5RWDU\7DEOH(OHYDWLRQIW
*URXQG/HYHOIW )LUVW)ODQJHIW
5.%%DVH)ODQJHIW
5.%7XELQJ6SRROIW
5LJV
5LJ1DPH
5,*
&RQWUDFWRU
'2<21
5LJ7\SH
/$1'5,*
5LJ1XP
5LJ6WDUW'DWH
5LJ5HOHDVH'DWH
'DLO\,QIRUPDWLRQ
:HDWKHU
2YHUFDVW:&
7HPSHUDWXUH)
:LQG
6:#03+
'D\V/7,GD\V 'D\V5,GD\V 32%
&RVW6XPPDU\
-RE$FFRXQW
&XUUHQF\&RGH
86'
7RWDO$)($PRXQW&RVW
'DLO\&RVW&RVW
&XPXODWLYH&RVW&RVW
'DLO\0XG)LHOG(VW&RVW
&XPXODWLYHPXG&RVW&RVW
7RWDO)LHOG6XSSRUWLV
6DIHW\,QFLGHQWV1HDU0LVV
'DWH
&DWHJRU\ 7\SH 6XEW\SH 6HYHULW\ &DXVH /RVWWLPH"
1R
&RPPHQW
=HUR+6(,QFLGHQWV5HYLHZHGWKH&
VZLWKDIRFXVRQ&RQWURORI:RUN5HYLHZHG(QL*ROGHQ5XOHVZLWKDIRFXVRQ/LIWLQJ2SHUDWLRQV
6DIHW\'ULOOV
7\SH 2FFXU /DVW'DWH 1H[W'DWH
'D\V8QWLO1H[W&KHFN
GD\V
&DVLQJVVHDW
&DV7\SH 2'LQ ,'LQ *UDGH 7RSIW.% %RWWRPIW.% 79'%RWIW.% /DQGLQJ'DWH
&21'8&725
&$6,1* /
&$6,1* /
/,1(5
/,1(5 /
/DVW&HPHQWLQJ
&HPHQWLQJ6WDUW'DWH6WULQJ/,1(5IW.%&RPPHQW;OLQHUKDQJHUSDFNHUVHWLQVLGHOLQHU72OLQHU#
EWPRIIORDWVKRH#
6WJ 7RSIW.% 7RS0HDV0HWK %WPIW.% &RP
6/%7HVWOLQHVWRSVL6/%SXPSEEOV0XG3XVKEEOVFHPHQWGURSZLSHUEDOOEEOV
0XG3XVKDQGULJGLVSODFHZEEOVVOLFNZDWHU6WLQJLQWROLQHUSDFNHUDQGVTXHH]HFHPHQWZEEOVRIVOLFN
ZDWHU&,3#KUV
-RE,QIRUPDWLRQ
-RE3KDVH
:25.29(5
%XGJHW7\SH
23(;
3ODQQHG6WDUW'DWH
6WDUW'DWH
(QG'DWH 3'XUDWLRQGD\V
3&RVW&RVW
'DLO\6XPPDU\2SHUDWLRQV
K)RUHFDVW
&RPSOHWHPRYLQJWR63)1
K6XPPDU\
3UHSIRUULJPRYHWR631VNLGULJIORRUDQG5'ULJFRPSRQHQWV
2SHUDWLRQDW
&RQWLQXHPRYLQJWR63)1
7LPH/RJ
6WDUW
7LPH
(QG
7LPH 'XUKU
&XP'XU
KU3KDVH 2SU $FW 3ODQ 2SHU'HVFU
(QG'HSWK
IW.%
02% $ 3 3-60±&KHFNOLVWDQGSUHSWRVNLGULJIORRU&OHDQLQJULJSLWV5'(63VSRROLQJXQLWDFFXPXODWRUKRXVH
GLVFRQQHFWPXGSXPS%ORZGRZQVXLWFDVHOLQHVDQGVWDUWGLVFRQQHFWLQJOLQHV0RYH+3´FRPSRQHQWV
DQG*DL7URQLFVWRZHOO%D\
02% $ 3 3-60&OHDQLQJURFNZDVKHUSLWVDQGFXWWLQJVER[3UHSULJSLWVIRUFHQWULIXJHLQVWDOOUHPRYHKRSSHUV5'
VXLWFDVHRQHDVWVLGHWRPXGSODQW&UDQHSLFNVRQDFFXPXODWRUKRXVHDQGPRYHG+DOOLEXUWRQORJJLQJXQLW
&KHFNWLUHSUHVVXUHRQPRYLQJV\VWHP1RWH6ZLWFKRIIKLJKOLQHSRZHUWRULJSRZHU#KUV
02% $ 3 3-60/D\RXWKHUFXOLWHOLQHUDQGULJPDWVIRU63)1ZHOO&RPSOHWHGURFNZDVKHUFOHDQLQJDQGSUHSWR
PRYH%ORZGRZQZDWHUDQGVWHDPOLQHRQULJIORRUURFNZDVKHUSLWVDQGSXPSV5HPRYHEULGJHRYHUXWLOLGRU
GLVFRQQHFWFHPHQWDQGWUDQVIHUOLQHVWR:,)IURPWKHURFNZDVKHUDQGFXWWLQJER[5'VFDIIROGLQJIUDPLQJIRU
KRRFKRQFXWWLQJWDQN
02% % 3 3-60±6NLGULJIORRUWRPRYHSRVLWLRQRYHUSLSHVKHGDQGUDLVHVWRPSHUVRQVXEPRGXOH5'
LQWHUFRQQHFWLRQVDQGHOHFWULFDOIURPURFNZDVKHUDQGSLWV0RYHPXGSXPSFXWWLQJWDQNDQGURFNZDVKHU
WRVWDJLQJDUHD(PSW\ULJZDWHUWDQNDQGIUHH]HSURWHFWERLOHUSXPSDQGVRIWHUV\VWHP5HPRYHKLJKOLQH
SRZHUFDEOHIRUVXEPRGXOH5'LQWHUFRQQHFWEHWZHHQSLWDQGVXEPRGXOHVFOHDUVWDJHDUHDIRUSLWPRGXOH
6SOLWSLWIURPVXEPRGXOH
2SHUDWLRQIURPWR
6WDUW
7LPH
(QG
7LPH 'XUKU
&XP'XU
KU3KDVH 2SU $FW 3ODQ 2SHU'HVFU
02% $ 3 3-60±-DFNXSDQGEDFNSLWPRGXOHDZD\IURPVXEPRGXOHUHPRYLQJVKLPVDQGVHWGRZQ6KXIIOHULJPDWVWREXLOGEULGJH
IRUPRYHWR63)1-DFNXSVXEPRGXOHDQGUHPRYHVKLPVEDFNRII631/0RYHKLJKOLQHSRZHUFDEOHHQGVIRU
63)1&RQWLQXHOD\LQJULJPDWVIRUWUDQVLWLRQEULGJHWR63
*DV5HDGLQJV
$YJ%DFNJURXQG*DV 0D[%DFNJURXQG*DV $YJ&RQQHFWLRQ*DV 0D[&RQQHFWLRQ*DV
$YJ'ULOO*DV 0D['ULOO*DV $YJ7ULS*DV 0D[7ULS*DV
&XPXODWLYH0XG9ROXPHV
$FWLYH9ROXPHEEO +ROH9ROXPHEEO /RVVHVEEO &XP$GGLWLRQVEEO $GGLWLRQVEEO &XP/RVVHVEEO
'DLO\&RQWDFWV
3RVLWLRQ &RQWDFW1DPH &RPSDQ\ 7LWOH (PDLO 2IILFH 0RELOH
(QLUHSUHVHQWDWLYH %UXFH6LPRQVRQ $65&(QHUJ\6HUYLFHV 'ULOOLQJ6XSY VLGGULOOLQJ#HQLFRP
(QLUHSUHVHQWDWLYH 'DYLG6PLWK $65&(QHUJ\6HUYLFHV 'ULOOLQJ6XSYVLGGULOOLQJ#HQLFRP
(QLUHSUHVHQWDWLYH :DGH7KRPDV $65&(QHUJ\6HUYLFHV 5LJ&OHUN $.5LJ&OHUNV'R\RQ#HQLFRP
(QLUHSUHVHQWDWLYH 3DW$KHUQ %HDFRQ +6( 3DWULFN$KHUQ#H[WHUQDOHQLFRP
7RRO3XVK 9LNWRU7RUUHV 'R\RQ'ULOOLQJ 7RRO3XVKHU ULJ#GR\RQGULOOLQJFRP
7RRO3XVK 7HG.UXJHU 'R\RQ'ULOOLQJ 7RXU3XVKHU ULJ#GR\RQGULOOLQJFRP
6DIHW\5HSUHVHQWDWLYH &OLII2ZHQV 'R\RQ'ULOOLQJ +6( FRZHQV#GR\RQGULOOLQJFRP
6DIHW\5HSUHVHQWDWLYH 6KDXQ7RZHU 'R\RQ'ULOOLQJ +6( VWRZHU#GR\RQGULOOLQJFRP
:HOO1DPH63)125
:HOOERUH1DPH63)1
:HOO&RGH
-RE:25.29(5
:&(,/(9(/
'DLO\5HSRUW
'DWH
5HSRUW
3DJHRI
3HUVRQQHO/RJ32%
&RPSDQ\ 6HUY7\SH :RUN+KU 6WDQGE\+KU &RXQW 1RWH
$65&(QHUJ\6HUYLFHV 5LJFOHUN
$65&(QHUJ\6HUYLFHV 62$
$65&(QHUJ\6HUYLFHV /LIW$GYLVRU
%($&21 +6(
&203(7(17,$ )XHOHU
$65&(QHUJ\6HUYLFHV &RPSDQ\PDQ
+$//,%85721 0XG/RJJHUV
6&+/80%(5*(5 6/%0,6ZDFR0XG(QJLQHHU
6&+/80%(5*(5 &HPHQW
9HWFR :HOOKHDG
%DNHU+XJKHV &RPSOHWLRQV
6&+/80%(5*(5 6/%0,6ZDFR0XGSODQW
6&+/80%(5*(5 6/%:,)
(;352 :HOO)ORZ
:25/(< 5LJ6XSSRUW
'2<21 2QVKRUH5LJ
%236WDFN &RPSRQHQWV
'HVFULSWLRQ
%236WDFN
6WDUW'DWH
/DVW&HUWLILFDWLRQ'DWH
3UHVVXUH5DWLQJSVL
7\SH 0DNH 0RGHO ,'1RPLQ 35DQJHSVL /DVW&HUW'DWH
$QQXODU +\GULO *.
;9%5
V +\GULO 03/
%OLQG6KHDU5DP +\GULO 03/
[9%5V +\GULO 03/
6ORZ&LUFXODWLRQ5DWHV
3XPS1XPEHU 0DNH0RGHO
6WDUW'DWH (QG'DWH /LQHU6L]HLQ 9ROXPH3HU6WURNH2YHUULGHEEOVWN 0D[3UHVVXUHSVL
'DWH 'HSWKIW.% 6ORZ6SG 6WURNHVVSP 3SVL (II 4)ORZJSP
'DLO\%XON
6XSSO\,WHP'HVFULSWLRQ(TXLSPHQW)XHO 8QLW/DEHO*DO 8QLW6L]H1RWH
'DWH &RQVXPHG 5HFHLYHG 5HWXUQHG &XP&RQVXPHG &XP5HFHLYHG &XP5HWXUQHG &XP2Q/RF 1RWH
6XSSO\,WHP'HVFULSWLRQ0XG3ODQW%RLOHUV 8QLW/DEHO*DO 8QLW6L]H 1RWH
'DWH &RQVXPHG 5HFHLYHG 5HWXUQHG &XP&RQVXPHG &XP5HFHLYHG &XP5HWXUQHG &XP2Q/RF 1RWH
6XSSO\,WHP'HVFULSWLRQ5LJ)XHO 8QLW/DEHOJDOXV 8QLW6L]H1RWH
'DWH &RQVXPHG 5HFHLYHG 5HWXUQHG &XP&RQVXPHG &XP5HFHLYHG &XP5HWXUQHG &XP2Q/RF 1RWH
6XSSO\,WHP'HVFULSWLRQ5LJ:DWHU 8QLW/DEHOEEO 8QLW6L]H1RWH
'DWH &RQVXPHG 5HFHLYHG 5HWXUQHG &XP&RQVXPHG &XP5HFHLYHG &XP5HWXUQHG &XP2Q/RF 1RWH
6XSSO\,WHP'HVFULSWLRQ:,)%RLOHUV 8QLW/DEHO*DO 8QLW6L]H 1RWH
'DWH &RQVXPHG 5HFHLYHG 5HWXUQHG &XP&RQVXPHG &XP5HFHLYHG &XP5HWXUQHG &XP2Q/RF 1RWH
/DVW$XWKRULW\9LVLW
'DWH 7RWLQVS1EU 7RWDO,1&QXPEHU &RPPHQW
6723&DUGV6XEPLWWHG
&RPSDQ\ 5SWV &RP
&RPSHWHQFLD 6WRS:RUN
&RPSHWHQFLD 2EVHUYDWLRQV
'R\RQ'ULOOLQJ,QF 3-60
V
'R\RQ'ULOOLQJ,QF 6WRS:RUN
'R\RQ'ULOOLQJ,QF +D]DUG,'
0,6ZDFR 2EVHUYDWLRQV
0,6ZDFR 6WRS:RUN
*HQHUDO1RWHV
&RPPHQW
:HOO1DPH63)125
:HOOERUH1DPH63)1
:HOO&RGH
-RE:25.29(5
:&(,/(9(/
'DLO\5HSRUW
'DWH
5HSRUW
3DJHRI
:HOO+HDGHU
3HUPLW&RQFHVVLRQ1
$'/
2SHUDWRU
(1,3(752/(80
6XEVLGLDU\
(1,3HWUROHXP&R,QF
,QLWLDO/DKHH&RGH
'(9(/230(17:(//
5RWDU\7DEOH(OHYDWLRQIW
*URXQG/HYHOIW )LUVW)ODQJHIW
5.%%DVH)ODQJHIW
5.%7XELQJ6SRROIW
5LJV
5LJ1DPH
5,*
&RQWUDFWRU
'2<21
5LJ7\SH
/$1'5,*
5LJ1XP
5LJ6WDUW'DWH
5LJ5HOHDVH'DWH
'DLO\,QIRUPDWLRQ
:HDWKHU
2YHUFDVW:&
7HPSHUDWXUH)
:LQG
6:#03+
'D\V/7,GD\V 'D\V5,GD\V 32%
&RVW6XPPDU\
-RE$FFRXQW
&XUUHQF\&RGH
86'
7RWDO$)($PRXQW&RVW
'DLO\&RVW&RVW
&XPXODWLYH&RVW&RVW
'DLO\0XG)LHOG(VW&RVW
&XPXODWLYHPXG&RVW&RVW
7RWDO)LHOG6XSSRUWLV
6DIHW\,QFLGHQWV1HDU0LVV
'DWH
&DWHJRU\ 7\SH 6XEW\SH 6HYHULW\ &DXVH /RVWWLPH"
1R
&RPPHQW
=HUR+6(,QFLGHQWV5HYLHZHGWKH&
VZLWKDIRFXVRQ&RPSHWHQF\5HYLHZHG(QL*ROGHQ5XOHVZLWKDIRFXVRQ3HUPLWWR:RUN
6DIHW\'ULOOV
7\SH 2FFXU /DVW'DWH 1H[W'DWH
'D\V8QWLO1H[W&KHFN
GD\V
&DVLQJVVHDW
&DV7\SH 2'LQ ,'LQ *UDGH 7RSIW.% %RWWRPIW.% 79'%RWIW.% /DQGLQJ'DWH
&21'8&725
&$6,1* /
&$6,1* /
/,1(5
/,1(5 /
/DVW&HPHQWLQJ
&HPHQWLQJ6WDUW'DWH6WULQJ/,1(5IW.%&RPPHQW;OLQHUKDQJHUSDFNHUVHWLQVLGHOLQHU72OLQHU#
EWPRIIORDWVKRH#
6WJ 7RSIW.% 7RS0HDV0HWK %WPIW.% &RP
6/%7HVWOLQHVWRSVL6/%SXPSEEOV0XG3XVKEEOVFHPHQWGURSZLSHUEDOOEEOV
0XG3XVKDQGULJGLVSODFHZEEOVVOLFNZDWHU6WLQJLQWROLQHUSDFNHUDQGVTXHH]HFHPHQWZEEOVRIVOLFN
ZDWHU&,3#KUV
-RE,QIRUPDWLRQ
-RE3KDVH
:25.29(5
%XGJHW7\SH
23(;
3ODQQHG6WDUW'DWH
6WDUW'DWH
(QG'DWH 3'XUDWLRQGD\V
3&RVW&RVW
'DLO\6XPPDU\2SHUDWLRQV
K)RUHFDVW
&RPSOHWH58RQ63)1
K6XPPDU\
0RYHWR631VNLGULJIORRUDQG58ULJFRPSRQHQWV
2SHUDWLRQDW
&RQWLQXHULJPRYHRSHUDWLRQV
7LPH/RJ
6WDUW
7LPH
(QG
7LPH 'XUKU
&XP'XU
KU3KDVH 2SU $FW 3ODQ 2SHU'HVFU
(QG'HSWK
IW.%
02% $ 3 3-60±-DFNXSDQGEDFNSLWPRGXOHDZD\IURPVXEPRGXOHUHPRYLQJVKLPVDQGVHWGRZQ6KXIIOHULJPDWV
WREXLOGEULGJHIRUPRYHWR63)1-DFNXSVXEPRGXOHDQGUHPRYHVKLPVEDFNRII631/0RYH
KLJKOLQHSRZHUFDEOHHQGVIRU63)1&RQWLQXHOD\LQJULJPDWVIRUWUDQVLWLRQEULGJHWR63
02% $ 3 3-60±0RYHVXEPRGXOHGRZQZHOOUROHVSRWWLQJRYHU63)1DQGVKLPDVUHTXLUHG3LFNXSSLWPRGXOH
DQGPRYHWRVXEPRGXOHDQGVKLPDVUHTXLUHGPDWFKLQJVXEKHLJKW3LFNLQJXSULJPDWVDQGEHUPLQJIURP
63
02% $ 3 3-60±,QVWDOOLQWHUFRQQHFWEHWZHHQVXESLWPRGXOHVDQGWXUQRQVWHDPORRSV3OXJSRZHUIURPSLWVWRVXE
DQGSRZHUWRULJVKRS6SRWPXGPDQVKDFNSOXJLQSRZHUDQGWDNHRQZDWHUIRUERLOHUV,QVWDOOKLJKOLQHFDEOH
WRULJVXEPRGXOH&RQWLQXHFKLQNLQJDLUJDSVEHWZHHQPRGXOHV
02% $ 3 3-60±6HWVWRPSHUVRIVXEPRGXOHRQEDFNVXSSRUWEHDPVNLGULJIORRULQWRGULOOLQJSRVLWLRQDQGORFNLQ
SODFHUDLVHVXSSRUWEHDPV,QVWDOOKDQGUDLOVDQGZDONZD\VRQVXESLWPRGXOHVDQGSHUIRUPSRVWFKHFNOLVWIRU
VNLG3UHSVXSSRUWWDEOHLQSLWVDQGLQVWDOOFHQWULIXJH,QVWDOOLQWHUFRQQHFWXQGHUULJIORRUDQGWXUQRQVWHDP/D\
KHUFXOLWHOLQHUDQGPDWVIRUPXGSXPSVDQGURFNZDVKHU1RWH6ZLWFKWRKLJKOLQHSRZHU#KUV
2SHUDWLRQIURPWR
6WDUW
7LPH
(QG
7LPH 'XUKU
&XP'XU
KU3KDVH 2SU $FW 3ODQ 2SHU'HVFU
02% $ 3 3-60±/D\GRZQKHUFXOLWHDQGPDWVIRUURFNZDVKHUDQGPXGSXPS$VVLVW(;352ZLWKFRQVWUXFWLRQRIFRQWDLQPHQWIRU
IORZEDFN58DFFXPXODWRUXQLWOLQHVWRULJVXEDQGEXLOGEHUP&RPSOHWHLQVWDOORIFHQWULIXJHDQGUHPRYHLQVWDOODWLRQWDEOHV
IRUSLWKRSSHUDUHD6SRWPXGSXPSWRSLWPRGXOH6WDUWEHUPLQJDURXQGULJ
*DV5HDGLQJV
$YJ%DFNJURXQG*DV 0D[%DFNJURXQG*DV $YJ&RQQHFWLRQ*DV 0D[&RQQHFWLRQ*DV
$YJ'ULOO*DV 0D['ULOO*DV $YJ7ULS*DV 0D[7ULS*DV
&XPXODWLYH0XG9ROXPHV
$FWLYH9ROXPHEEO +ROH9ROXPHEEO /RVVHVEEO &XP$GGLWLRQVEEO $GGLWLRQVEEO &XP/RVVHVEEO
'DLO\&RQWDFWV
3RVLWLRQ &RQWDFW1DPH &RPSDQ\ 7LWOH (PDLO 2IILFH 0RELOH
(QLUHSUHVHQWDWLYH %UXFH6LPRQVRQ $65&(QHUJ\6HUYLFHV 'ULOOLQJ6XSY VLGGULOOLQJ#HQLFRP
(QLUHSUHVHQWDWLYH 'DYLG6PLWK $65&(QHUJ\6HUYLFHV 'ULOOLQJ6XSYVLGGULOOLQJ#HQLFRP
(QLUHSUHVHQWDWLYH :DGH7KRPDV $65&(QHUJ\6HUYLFHV 5LJ&OHUN $.5LJ&OHUNV'R\RQ#HQLFRP
(QLUHSUHVHQWDWLYH 3DW$KHUQ %HDFRQ +6( 3DWULFN$KHUQ#H[WHUQDOHQLFRP
7RRO3XVK 9LNWRU7RUUHV 'R\RQ'ULOOLQJ 7RRO3XVKHU ULJ#GR\RQGULOOLQJFRP
7RRO3XVK 7HG.UXJHU 'R\RQ'ULOOLQJ 7RXU3XVKHU ULJ#GR\RQGULOOLQJFRP
6DIHW\5HSUHVHQWDWLYH &OLII2ZHQV 'R\RQ'ULOOLQJ +6( FRZHQV#GR\RQGULOOLQJFRP
6DIHW\5HSUHVHQWDWLYH 6KDXQ7RZHU 'R\RQ'ULOOLQJ +6( VWRZHU#GR\RQGULOOLQJFRP
:HOO1DPH63)125
:HOOERUH1DPH63)1
:HOO&RGH
-RE:25.29(5
:&(,/(9(/
'DLO\5HSRUW
'DWH
5HSRUW
3DJHRI
3HUVRQQHO/RJ32%
&RPSDQ\ 6HUY7\SH :RUN+KU 6WDQGE\+KU &RXQW 1RWH
$65&(QHUJ\6HUYLFHV 5LJFOHUN
$65&(QHUJ\6HUYLFHV 62$
$65&(QHUJ\6HUYLFHV /LIW$GYLVRU
%($&21 +6(
&203(7(17,$ )XHOHU
$65&(QHUJ\6HUYLFHV &RPSDQ\PDQ
+$//,%85721 0XG/RJJHUV
6&+/80%(5*(5 6/%0,6ZDFR0XG(QJLQHHU
6&+/80%(5*(5 &HPHQW
9HWFR :HOOKHDG
%DNHU+XJKHV &RPSOHWLRQV
6&+/80%(5*(5 6/%0,6ZDFR0XGSODQW
6&+/80%(5*(5 6/%:,)
(;352 :HOO)ORZ
:25/(< 5LJ6XSSRUW
'2<21 2QVKRUH5LJ
%236WDFN &RPSRQHQWV
'HVFULSWLRQ
%236WDFN
6WDUW'DWH
/DVW&HUWLILFDWLRQ'DWH
3UHVVXUH5DWLQJSVL
7\SH 0DNH 0RGHO ,'1RPLQ 35DQJHSVL /DVW&HUW'DWH
$QQXODU +\GULO *.
;9%5
V +\GULO 03/
%OLQG6KHDU5DP +\GULO 03/
[9%5V +\GULO 03/
6ORZ&LUFXODWLRQ5DWHV
3XPS1XPEHU 0DNH0RGHO
6WDUW'DWH (QG'DWH /LQHU6L]HLQ 9ROXPH3HU6WURNH2YHUULGHEEOVWN 0D[3UHVVXUHSVL
'DWH 'HSWKIW.% 6ORZ6SG 6WURNHVVSP 3SVL (II 4)ORZJSP
'DLO\%XON
6XSSO\,WHP'HVFULSWLRQ(TXLSPHQW)XHO 8QLW/DEHO*DO 8QLW6L]H1RWH
'DWH &RQVXPHG 5HFHLYHG 5HWXUQHG &XP&RQVXPHG &XP5HFHLYHG &XP5HWXUQHG &XP2Q/RF 1RWH
6XSSO\,WHP'HVFULSWLRQ0XG3ODQW%RLOHUV 8QLW/DEHO*DO 8QLW6L]H 1RWH
'DWH &RQVXPHG 5HFHLYHG 5HWXUQHG &XP&RQVXPHG &XP5HFHLYHG &XP5HWXUQHG &XP2Q/RF 1RWH
6XSSO\,WHP'HVFULSWLRQ5LJ)XHO 8QLW/DEHOJDOXV 8QLW6L]H1RWH
'DWH &RQVXPHG 5HFHLYHG 5HWXUQHG &XP&RQVXPHG &XP5HFHLYHG &XP5HWXUQHG &XP2Q/RF 1RWH
6XSSO\,WHP'HVFULSWLRQ5LJ:DWHU 8QLW/DEHOEEO 8QLW6L]H1RWH
'DWH &RQVXPHG 5HFHLYHG 5HWXUQHG &XP&RQVXPHG &XP5HFHLYHG &XP5HWXUQHG &XP2Q/RF 1RWH
6XSSO\,WHP'HVFULSWLRQ:,)%RLOHUV 8QLW/DEHO*DO 8QLW6L]H 1RWH
'DWH &RQVXPHG 5HFHLYHG 5HWXUQHG &XP&RQVXPHG &XP5HFHLYHG &XP5HWXUQHG &XP2Q/RF 1RWH
/DVW$XWKRULW\9LVLW
'DWH 7RWLQVS1EU 7RWDO,1&QXPEHU &RPPHQW
6723&DUGV6XEPLWWHG
&RPSDQ\ 5SWV &RP
'R\RQ'ULOOLQJ,QF +D]DUG,'
'R\RQ'ULOOLQJ,QF 6WRS:RUN
'R\RQ'ULOOLQJ,QF 0HQWRULQJ
'R\RQ'ULOOLQJ,QF3-60
V
([SUR 2EVHUYDWLRQV
([SUR 0HQWRULQJ
0,6ZDFR 2EVHUYDWLRQV
0,6ZDFR 6WRS:RUN
:RUOH\ 2EVHUYDWLRQV
*HQHUDO1RWHV
&RPPHQW
:HOO1DPH63)125
:HOOERUH1DPH63)1
:HOO&RGH
-RE:25.29(5
:&(,/(9(/
'DLO\5HSRUW
'DWH
5HSRUW
3DJHRI
:HOO+HDGHU
3HUPLW&RQFHVVLRQ1
$'/
2SHUDWRU
(1,3(752/(80
6XEVLGLDU\
(1,3HWUROHXP&R,QF
,QLWLDO/DKHH&RGH
'(9(/230(17:(//
5RWDU\7DEOH(OHYDWLRQIW
*URXQG/HYHOIW )LUVW)ODQJHIW
5.%%DVH)ODQJHIW
5.%7XELQJ6SRROIW
5LJV
5LJ1DPH
5,*
&RQWUDFWRU
'2<21
5LJ7\SH
/$1'5,*
5LJ1XP
5LJ6WDUW'DWH
5LJ5HOHDVH'DWH
'DLO\,QIRUPDWLRQ
:HDWKHU
&OHDU:&
7HPSHUDWXUH)
:LQG
1(#03+
'D\V/7,GD\V 'D\V5,GD\V 32%
6DIHW\,QFLGHQWV1HDU0LVV
'DWH
&DWHJRU\ 7\SH 6XEW\SH 6HYHULW\ &DXVH /RVWWLPH"
1R
&RPPHQW
=HUR+6(,QFLGHQWV5HYLHZHGWKH&
VZLWKDIRFXVRQ&RPPLWPHQW5HYLHZHG(QL*ROGHQ5XOHVZLWKDIRFXVRQ)LUH6DIHW\
6DIHW\'ULOOV
7\SH 2FFXU /DVW'DWH 1H[W'DWH
'D\V8QWLO1H[W&KHFN
GD\V
5LJ,QVSHFWLRQ
6DIHW\0HHWLQJ
&DVLQJVVHDW
&DV7\SH 2'LQ ,'LQ *UDGH 7RSIW.% %RWWRPIW.% 79'%RWIW.% /DQGLQJ'DWH
&21'8&725
&$6,1* /
&$6,1* /
/,1(5
/,1(5 /
/DVW&HPHQWLQJ
&HPHQWLQJ6WDUW'DWH6WULQJ/,1(5IW.%&RPPHQW;OLQHUKDQJHUSDFNHUVHWLQVLGHOLQHU72OLQHU#
EWPRIIORDWVKRH#
6WJ 7RSIW.% 7RS0HDV0HWK %WPIW.% &RP
6/%7HVWOLQHVWRSVL6/%SXPSEEOV0XG3XVKEEOVFHPHQWGURSZLSHUEDOOEEOV
0XG3XVKDQGULJGLVSODFHZEEOVVOLFNZDWHU6WLQJLQWROLQHUSDFNHUDQGVTXHH]HFHPHQWZEEOVRIVOLFN
ZDWHU&,3#KUV
-RE,QIRUPDWLRQ
-RE3KDVH
:25.29(5
3ODQQHG6WDUW'DWH
6WDUW'DWH
(QG'DWH 3'XUDWLRQGD\V
'DLO\6XPPDU\2SHUDWLRQV
K)RUHFDVW
.LOOZHOOSHUSURFHGXUH1'WUHHDQG18%233UHSWRWHVW
K6XPPDU\
&RPSOHWH587UDQVIHUEULQHWRULJIRUZHOONLOO
2SHUDWLRQDW
:HOO.LOO2SHUDWLRQV
7LPH/RJ
6WDUW
7LPH
(QG
7LPH 'XUKU
&XP'XU
KU3KDVH 2SU $FW 3ODQ 2SHU'HVFU
02% $ 3 3-60±/D\GRZQKHUFXOLWHDQGPDWVIRUURFNZDVKHUDQGPXGSXPS$VVLVW(;352ZLWKFRQVWUXFWLRQRIFRQWDLQPHQWIRU
IORZEDFN58DFFXPXODWRUXQLWOLQHVWRULJVXEDQGEXLOGEHUP&RPSOHWHLQVWDOORIFHQWULIXJHDQGUHPRYHLQVWDOODWLRQWDEOHV
IRUSLWKRSSHUDUHD6SRWPXGSXPSWRSLWPRGXOH6WDUWEHUPLQJDURXQGULJ
02% $ 3 3-60±58VXLWFDVHOLQHVIURPPXGSODQWDQGSURGXFWLRQGLHVHOZDWHUDQGEULQHSUHVVXUHWHVW58OLQHVRQ%23IRU
EXOOKHDGRSHUDWLRQRQNLOOOLQHV+RRNXSFKRNHOLQHRQSLWPRGXOHURRI5HLQVWDOOWZRPXGKRSSHULQPXGSLW&RQWLQXH
EHUPLQJDURXQGPRGXOHVDQGPXGSXPSDQGURFNZDVKHU
02% $ 3 3-60±)LQLVKHGVSRWWLQJPXGSXPSKRRNXSLQWHUFRQQHFWLRQDQGWXUQRQVWHDPDQGSOXJLQHOHFWULFDO+RRNXSIORZOLQH
DQGFKRNHOLQH0DNHXS%23DFFXPXODWRUKRVHVWRXQLW6SRWURFNZDVKHUDQGKRRNXSVWHDPDQGHOHFWULFDO6SRWFXWWLQJ
WDQNXQGHUDXJHURIURFNZDVKHU6SRW+DOOLEXUWRQORJJHUVKDFNDQGSOXJLQ&RQWLQXHEHUPLQJDURXQGULJ1RWH1RWLILHG
$2*&&RI%23WHVW#KUV*X\&RR.#KUVUHVSRQGHGDQGZLOOXSGDWHLQWKHPRUQLQJ
02% $ 3 3-60±58OLQHVWRWXELQJDQG$DQQXOXVIURP#VHFRQGDU\NLOOOLQHIRUEXOOKHDGLQJ&RPSOHWHGEHUPLQJDQGWDNHRQGLHVHO
IURPSURGXFWLRQ
02% $ 3 7DNHRQEEOVRISSJ.&/1$&OEULQHZLWKELRFLGHWRULJSLWVIURPPXGSODQW1RWH+HOGVDIHW\VWDQGGRZQZLWK
FUHZFRPLQJRQWRXU±UHYLHZDQGGLVFXVVHGUHFHQWILQJHULQFLGHQW$OVRKHOGVDIHW\VWDQGGRZQZLWK:,)DQG0XGSODQW
SHUVRQQHO5HSDLUPDQXDOWDQNLQGLFDWRUFDEOHLQSLW
02% $ 3 +HOG6DIHW\6WDQG'RZQUHYLHZHGDQGGLVFXVVHGUHFHQWILQJHULQFLGHQW
*DV5HDGLQJV
$YJ%DFNJURXQG*DV 0D[%DFNJURXQG*DV $YJ&RQQHFWLRQ*DV 0D[&RQQHFWLRQ*DV
$YJ'ULOO*DV 0D['ULOO*DV $YJ7ULS*DV 0D[7ULS*DV
'DLO\0XG9ROXPHV
7DQN$GGLWLRQ/RVV 7\SH 'HV 9ROXPHEEO
7DQN
+ROH
/RVV
&XPXODWLYH0XG9ROXPHV
$FWLYH9ROXPHEEO
+ROH9ROXPHEEO
$GGLWLRQVEEO
&XP$GGLWLRQVEEO
/RVVHVEEO
&XP/RVVHVEEO
'DLO\&RQWDFWV
3RVLWLRQ &RQWDFW1DPH &RPSDQ\ 7LWOH (PDLO 2IILFH 0RELOH
(QLUHSUHVHQWDWLYH %UXFH6LPRQVRQ $65&(QHUJ\6HUYLFHV 'ULOOLQJ6XSY VLGGULOOLQJ#HQLFRP
(QLUHSUHVHQWDWLYH 'DYLG6PLWK $65&(QHUJ\6HUYLFHV 'ULOOLQJ6XSYVLGGULOOLQJ#HQLFRP
(QLUHSUHVHQWDWLYH :DGH7KRPDV $65&(QHUJ\6HUYLFHV 5LJ&OHUN $.5LJ&OHUNV'R\RQ#HQLFRP
(QLUHSUHVHQWDWLYH 3DW$KHUQ %HDFRQ +6( 3DWULFN$KHUQ#H[WHUQDOHQLFRP
7RRO3XVK 9LNWRU7RUUHV 'R\RQ'ULOOLQJ 7RRO3XVKHU ULJ#GR\RQGULOOLQJFRP
7RRO3XVK 7HG.UXJHU 'R\RQ'ULOOLQJ 7RXU3XVKHU ULJ#GR\RQGULOOLQJFRP
6DIHW\5HSUHVHQWDWLYH &OLII2ZHQV 'R\RQ'ULOOLQJ +6( FRZHQV#GR\RQGULOOLQJFRP
6DIHW\5HSUHVHQWDWLYH 6KDXQ7RZHU 'R\RQ'ULOOLQJ +6( VWRZHU#GR\RQGULOOLQJFRP
3HUVRQQHO/RJ32%
&RPSDQ\ 6HUY7\SH :RUN+KU 6WDQGE\+KU &RXQW 1RWH
$65&(QHUJ\6HUYLFHV 5LJFOHUN
:HOO1DPH63)125
:HOOERUH1DPH63)1
:HOO&RGH
-RE:25.29(5
:&(,/(9(/
'DLO\5HSRUW
'DWH
5HSRUW
3DJHRI
3HUVRQQHO/RJ32%
&RPSDQ\ 6HUY7\SH :RUN+KU 6WDQGE\+KU &RXQW 1RWH
$65&(QHUJ\6HUYLFHV 62$
$65&(QHUJ\6HUYLFHV /LIW$GYLVRU
%($&21 +6(
&203(7(17,$ )XHOHU
$65&(QHUJ\6HUYLFHV &RPSDQ\PDQ
+$//,%85721 0XG/RJJHUV
6&+/80%(5*(5 6/%0,6ZDFR0XG(QJLQHHU
6&+/80%(5*(5 &HPHQW
9HWFR :HOOKHDG
%DNHU+XJKHV &RPSOHWLRQV
6&+/80%(5*(5 6/%0,6ZDFR0XGSODQW
6&+/80%(5*(5 6/%:,)
(;352 :HOO)ORZ
:25/(< 5LJ6XSSRUW
'2<21 2QVKRUH5LJ
%236WDFN &RPSRQHQWV
'HVFULSWLRQ
%236WDFN
6WDUW'DWH
/DVW&HUWLILFDWLRQ'DWH
3UHVVXUH5DWLQJSVL
7\SH 0DNH 0RGHO ,'1RPLQ 35DQJHSVL /DVW&HUW'DWH
$QQXODU +\GULO *.
;9%5
V +\GULO 03/
%OLQG6KHDU5DP +\GULO 03/
[9%5V +\GULO 03/
6ORZ&LUFXODWLRQ5DWHV
3XPS1XPEHU 0DNH0RGHO
6WDUW'DWH (QG'DWH /LQHU6L]HLQ 9ROXPH3HU6WURNH2YHUULGHEEOVWN 0D[3UHVVXUHSVL
'DWH 'HSWKIW.% 6ORZ6SG 6WURNHVVSP 3SVL (II 4)ORZJSP
'DLO\%XON
6XSSO\,WHP'HVFULSWLRQ(TXLSPHQW)XHO 8QLW/DEHO*DO 8QLW6L]H1RWH
'DWH
&RQVXPHG
5HFHLYHG
5HWXUQHG &XP&RQVXPHG
&XP5HFHLYHG
&XP5HWXUQHG
&XP2Q/RF
1RWH
6XSSO\,WHP'HVFULSWLRQ0XG3ODQW%RLOHUV 8QLW/DEHO*DO 8QLW6L]H 1RWH
'DWH
&RQVXPHG
5HFHLYHG
5HWXUQHG &XP&RQVXPHG
&XP5HFHLYHG
&XP5HWXUQHG
&XP2Q/RF
1RWH
6XSSO\,WHP'HVFULSWLRQ5LJ)XHO 8QLW/DEHOJDOXV 8QLW6L]H1RWH
'DWH
&RQVXPHG
5HFHLYHG
5HWXUQHG &XP&RQVXPHG
&XP5HFHLYHG
&XP5HWXUQHG
&XP2Q/RF
1RWH
6XSSO\,WHP'HVFULSWLRQ5LJ:DWHU 8QLW/DEHOEEO 8QLW6L]H1RWH
'DWH
&RQVXPHG
5HFHLYHG
5HWXUQHG &XP&RQVXPHG
&XP5HFHLYHG
&XP5HWXUQHG
&XP2Q/RF
1RWH
6XSSO\,WHP'HVFULSWLRQ:,)%RLOHUV 8QLW/DEHO*DO 8QLW6L]H 1RWH
'DWH
&RQVXPHG
5HFHLYHG
5HWXUQHG &XP&RQVXPHG
&XP5HFHLYHG
&XP5HWXUQHG
&XP2Q/RF
1RWH
/DVW$XWKRULW\9LVLW
'DWH 7RWLQVS1EU 7RWDO,1&QXPEHU &RPPHQW
6723&DUGV6XEPLWWHG
&RPSDQ\ 5SWV &RP
'R\RQ'ULOOLQJ,QF +D]DUG,'
'R\RQ'ULOOLQJ,QF 6WRS:RUN
'R\RQ'ULOOLQJ,QF 3-60
V
'R\RQ'ULOOLQJ,QF 2EVHUYDWLRQV
([SUR +D]DUG,'
([SUR 2EVHUYDWLRQV
0,6ZDFR 8QVDIH&RQGLWLRQ
0,6ZDFR 6WRS:RUN
0,6ZDFR 2EVHUYDWLRQV
:RUOH\ 2EVHUYDWLRQV
*HQHUDO1RWHV
&RPPHQW
:HOO1DPH63)125
:HOOERUH1DPH63)1
:HOO&RGH
-RE:25.29(5
:&(,/(9(/
'DLO\5HSRUW
'DWH
5HSRUW
3DJHRI
:HOO+HDGHU
3HUPLW&RQFHVVLRQ1
$'/
2SHUDWRU
(1,3(752/(80
6XEVLGLDU\
(1,3HWUROHXP&R,QF
,QLWLDO/DKHH&RGH
'(9(/230(17:(//
5RWDU\7DEOH(OHYDWLRQIW
*URXQG/HYHOIW )LUVW)ODQJHIW
5.%%DVH)ODQJHIW
5.%7XELQJ6SRROIW
5LJV
5LJ1DPH
5,*
&RQWUDFWRU
'2<21
5LJ7\SH
/$1'5,*
5LJ1XP
5LJ6WDUW'DWH
5LJ5HOHDVH'DWH
'DLO\,QIRUPDWLRQ
:HDWKHU
&OHDU:&
7HPSHUDWXUH)
:LQG
1(#03+
'D\V/7,GD\V 'D\V5,GD\V 32%
6DIHW\,QFLGHQWV1HDU0LVV
'DWH
&DWHJRU\ 7\SH 6XEW\SH 6HYHULW\ &DXVH /RVWWLPH"
1R
&RPPHQW
=HUR+6(,QFLGHQWV5HYLHZHGWKH&
VZLWKDIRFXVRQ&RQWURORI:RUN5HYLHZHG(QL*ROGHQ5XOHVZLWKDIRFXVRQ:DVWH0DQDJHPHQW
6DIHW\'ULOOV
7\SH 2FFXU /DVW'DWH 1H[W'DWH
'D\V8QWLO1H[W&KHFN
GD\V
5LJ,QVSHFWLRQ
6DIHW\0HHWLQJ
&DVLQJVVHDW
&DV7\SH 2'LQ ,'LQ *UDGH 7RSIW.% %RWWRPIW.% 79'%RWIW.% /DQGLQJ'DWH
&21'8&725
&$6,1* /
&$6,1* /
/,1(5
/,1(5 /
/DVW&HPHQWLQJ
&HPHQWLQJ6WDUW'DWH6WULQJ/,1(5IW.%&RPPHQW;OLQHUKDQJHUSDFNHUVHWLQVLGHOLQHU72OLQHU#
EWPRIIORDWVKRH#
6WJ 7RSIW.% 7RS0HDV0HWK %WPIW.% &RP
6/%7HVWOLQHVWRSVL6/%SXPSEEOV0XG3XVKEEOVFHPHQWGURSZLSHUEDOOEEOV
0XG3XVKDQGULJGLVSODFHZEEOVVOLFNZDWHU6WLQJLQWROLQHUSDFNHUDQGVTXHH]HFHPHQWZEEOVRIVOLFN
ZDWHU&,3#KUV
-RE,QIRUPDWLRQ
-RE3KDVH
:25.29(5
3ODQQHG6WDUW'DWH
6WDUW'DWH
(QG'DWH 3'XUDWLRQGD\V
'DLO\6XPPDU\2SHUDWLRQV
K)RUHFDVW
0RQLWRUZHOOSHUSURFHGXUH1'WUHHDQG18%23
K6XPPDU\
%XOOKHDGZHOOSHUSURFHGXUHVQRWNLOO%XLOGKHDYLHUEULQHDQGEXOOKHDGDJDLQSHUSURFHGXUH
2SHUDWLRQDW
%OHHGGRZQZHOOPRQLWRUSUHVVXUH
7LPH/RJ
6WDUW
7LPH
(QG
7LPH 'XUKU
&XP'XU
KU3KDVH 2SU $FW 3ODQ 2SHU'HVFU
:2 0 3 3-60±&RQWLQXHWUDQVIHUULQJSSJ.&/1D&OZLWKELRFLGHIURPPXGSODQW&RQILUPOLQHXSIRUEXOOKHDGLQJ
:2 0 3 3-60±3HUIRUPEXOOKHDGRSHUDWLRQZLWKSSJ.&/1D&OZLWKELRFLGHSUHVVXUHWHVWOLQHVWRSVL%HIRUHSXPSLQJ
VWDWLFSUHVVXUHWEJ SVL$DQQXOXV SVL%DQQXOXV SVL%XOOKHDGEEOVGRZQWEJUDWHESP#
SVL6ZLWFKWR$DQQXOXVSXPSHGEEOVUDWHESP#SVL6KXW
GRZQWEJ SVL$DQQXOXV SVL%DQQXOXV SVL
$IWHU,KRXUWEJ SVL$DQQXOXV SVL%DQQXOXV SVL
:2 0 3 3-60±/LQHXSWXELQJWREOHHGWDQNDQGVWDUWHGEOHHGLQJREVHUYHGFUXGHDQGJDVPL[WXUHZLWKDWRWDOEEOVEDFNVKXW
GRZQSUHVVXUHWEJSVL$DQQXOXV SVL%DQQXOXV SVL3UHSWREOHHG$DQQXOXVWRSURGXFWLRQ
:2 0 3 3-60±%OHHG$DQQXOXVWRSURGXFWLRQKHDGHUDQGPRQLWRUSUHVVXUHWEJDQG%DQQXOXV%XLOGSSJ.&/1D&OZLWK
ELRFLGHLQPXGSODQW3URGXFWLRQRQO\KDVRQHVRXUFHZDWHURSHUDWLRQDO
:2 0 3 &RQWLQXHWREOHHGWRSURGXFWLRQDQGPRQLWRUSUHVVXUH7UDQVIHUEEOVIURPPXGSODQWWRPXGSLWVZLWKWRWDOEEOVRI
SSJDQGZHLJKWXSWRSSJ0XGSODQWFRQWLQXHGEXLOGLQJEULQHIRUZHOONLOO
:2 0 3 3-60±6HFRQGEXOOKHDGRSHUDWLRQZLWKSSJ.&/1D&OZLWKELRFLGH%HIRUHSXPSLQJVWDWLFWEJ SVL$
DQQXOXV SVL%DQQXOXV SVL%XOOKHDGEEOVGRZQWEJUDWHESP#SVL6ZLWFKWR$DQQXOXVSXPSHG
EEOVUDWHESP#SVL6KXW
GRZQWEJ SVL$DQQXOXV SVL%DQQXOXV SVL$IWHUPLQWEJ
SVL$DQQXOXV SVL%DQQXOXV SVL
1RWH7RWDOORVV EEOVSSJSSJRI.&/1D&OEULQH
*DV5HDGLQJV
$YJ%DFNJURXQG*DV 0D[%DFNJURXQG*DV $YJ&RQQHFWLRQ*DV 0D[&RQQHFWLRQ*DV
$YJ'ULOO*DV 0D['ULOO*DV $YJ7ULS*DV 0D[7ULS*DV
'DLO\0XG9ROXPHV
7DQN$GGLWLRQ/RVV 7\SH 'HV 9ROXPHEEO
7DQN
+ROH
/RVV
&XPXODWLYH0XG9ROXPHV
$FWLYH9ROXPHEEO
+ROH9ROXPHEEO
$GGLWLRQVEEO
&XP$GGLWLRQVEEO
/RVVHVEEO
&XP/RVVHVEEO
'DLO\&RQWDFWV
3RVLWLRQ &RQWDFW1DPH &RPSDQ\ 7LWOH (PDLO 2IILFH 0RELOH
(QLUHSUHVHQWDWLYH %UXFH6LPRQVRQ $65&(QHUJ\6HUYLFHV 'ULOOLQJ6XSY VLGGULOOLQJ#HQLFRP
(QLUHSUHVHQWDWLYH 'DYLG6PLWK $65&(QHUJ\6HUYLFHV 'ULOOLQJ6XSYVLGGULOOLQJ#HQLFRP
(QLUHSUHVHQWDWLYH &KDG*XHFR $65&(QHUJ\6HUYLFHV 'ULOOLQJ6XSY VLGGULOOLQJ#HQLFRP
(QLUHSUHVHQWDWLYH :DGH7KRPDV $65&(QHUJ\6HUYLFHV 5LJ&OHUN $.5LJ&OHUNV'R\RQ#HQLFRP
(QLUHSUHVHQWDWLYH 0DUN+XEOHU %HDFRQ +6( PDUNKXEOHU#H[WHUQDOHQLFRP
7RRO3XVK 9LNWRU7RUUHV 'R\RQ'ULOOLQJ 7RRO3XVKHU ULJ#GR\RQGULOOLQJFRP
7RRO3XVK 7HG.UXJHU 'R\RQ'ULOOLQJ 7RXU3XVKHU ULJ#GR\RQGULOOLQJFRP
6DIHW\5HSUHVHQWDWLYH &OLII2ZHQV 'R\RQ'ULOOLQJ +6( FRZHQV#GR\RQGULOOLQJFRP
6DIHW\5HSUHVHQWDWLYH 'DYH6HQD 'R\RQ'ULOOLQJ +6( GVHQD#GR\RQGULOOLQJFRP
:HOO1DPH63)125
:HOOERUH1DPH63)1
:HOO&RGH
-RE:25.29(5
:&(,/(9(/
'DLO\5HSRUW
'DWH
5HSRUW
3DJHRI
3HUVRQQHO/RJ32%
&RPSDQ\ 6HUY7\SH :RUN+KU 6WDQGE\+KU &RXQW 1RWH
$65&(QHUJ\6HUYLFHV 5LJFOHUN
$65&(QHUJ\6HUYLFHV 62$
$65&(QHUJ\6HUYLFHV /LIW$GYLVRU
%($&21 +6(
&203(7(17,$ )XHOHU
9HWFR :HOOKHDG
$65&(QHUJ\6HUYLFHV &RPSDQ\PDQ
+$//,%85721 0XG/RJJHUV
6&+/80%(5*(5 6/%0,6ZDFR0XG(QJLQHHU
6&+/80%(5*(5 &HPHQW
%DNHU+XJKHV &RPSOHWLRQV
/LWWOH5HG6HUYLFHV 3XPSLQJ
*%5 &DVLQJ6HUYLFH
6&+/80%(5*(5 6/%0,6ZDFR0XGSODQW
6&+/80%(5*(5 6/%:,)
(;352 :HOO)ORZ
:25/(< 5LJ6XSSRUW
'2<21 2QVKRUH5LJ
%236WDFN &RPSRQHQWV
'HVFULSWLRQ
%236WDFN
6WDUW'DWH
/DVW&HUWLILFDWLRQ'DWH
3UHVVXUH5DWLQJSVL
7\SH 0DNH 0RGHO ,'1RPLQ 35DQJHSVL /DVW&HUW'DWH
$QQXODU +\GULO *.
;9%5
V +\GULO 03/
%OLQG6KHDU5DP +\GULO 03/
[9%5V +\GULO 03/
6ORZ&LUFXODWLRQ5DWHV
3XPS1XPEHU 0DNH0RGHO
6WDUW'DWH (QG'DWH /LQHU6L]HLQ 9ROXPH3HU6WURNH2YHUULGHEEOVWN 0D[3UHVVXUHSVL
'DWH 'HSWKIW.% 6ORZ6SG 6WURNHVVSP 3SVL (II 4)ORZJSP
'DLO\%XON
6XSSO\,WHP'HVFULSWLRQ(TXLSPHQW)XHO 8QLW/DEHO*DO 8QLW6L]H1RWH
'DWH
&RQVXPHG
5HFHLYHG
5HWXUQHG &XP&RQVXPHG
&XP5HFHLYHG
&XP5HWXUQHG
&XP2Q/RF
1RWH
6XSSO\,WHP'HVFULSWLRQ0XG3ODQW%RLOHUV 8QLW/DEHO*DO 8QLW6L]H 1RWH
'DWH
&RQVXPHG
5HFHLYHG
5HWXUQHG &XP&RQVXPHG
&XP5HFHLYHG
&XP5HWXUQHG
&XP2Q/RF
1RWH
6XSSO\,WHP'HVFULSWLRQ5LJ)XHO 8QLW/DEHOJDOXV 8QLW6L]H1RWH
'DWH
&RQVXPHG
5HFHLYHG
5HWXUQHG &XP&RQVXPHG
&XP5HFHLYHG
&XP5HWXUQHG
&XP2Q/RF
1RWH
6XSSO\,WHP'HVFULSWLRQ5LJ:DWHU 8QLW/DEHOEEO 8QLW6L]H1RWH
'DWH
&RQVXPHG
5HFHLYHG
5HWXUQHG &XP&RQVXPHG
&XP5HFHLYHG
&XP5HWXUQHG
&XP2Q/RF
1RWH
6XSSO\,WHP'HVFULSWLRQ:,)%RLOHUV 8QLW/DEHO*DO 8QLW6L]H 1RWH
'DWH
&RQVXPHG
5HFHLYHG
5HWXUQHG &XP&RQVXPHG
&XP5HFHLYHG
&XP5HWXUQHG
&XP2Q/RF
1RWH
/DVW$XWKRULW\9LVLW
'DWH 7RWLQVS1EU 7RWDO,1&QXPEHU &RPPHQW
6723&DUGV6XEPLWWHG
&RPSDQ\ 5SWV &RP
'R\RQ'ULOOLQJ,QF3-60
V
'R\RQ'ULOOLQJ,QF2EVHUYDWLRQV
'R\RQ'ULOOLQJ,QF 6WRS:RUN
'R\RQ'ULOOLQJ,QF +D]DUG,'
([SUR 2EVHUYDWLRQV
([SUR +D]DUG,'
0,6ZDFR 8QVDIH&RQGLWLRQ
0,6ZDFR +D]DUG,'
0,6ZDFR 2EVHUYDWLRQV
:RUOH\ +D]DUG,'
:RUOH\ 2EVHUYDWLRQV
*HQHUDO1RWHV
&RPPHQW
:HOO1DPH63)125
:HOOERUH1DPH63)1
:HOO&RGH
-RE:25.29(5
:&(,/(9(/
'DLO\5HSRUW
'DWH
5HSRUW
3DJHRI
:HOO+HDGHU
3HUPLW&RQFHVVLRQ1
$'/
2SHUDWRU
(1,3(752/(80
6XEVLGLDU\
(1,3HWUROHXP&R,QF
,QLWLDO/DKHH&RGH
'(9(/230(17:(//
5RWDU\7DEOH(OHYDWLRQIW
*URXQG/HYHOIW )LUVW)ODQJHIW
5.%%DVH)ODQJHIW
5.%7XELQJ6SRROIW
5LJV
5LJ1DPH
5,*
&RQWUDFWRU
'2<21
5LJ7\SH
/$1'5,*
5LJ1XP
5LJ6WDUW'DWH
5LJ5HOHDVH'DWH
'DLO\,QIRUPDWLRQ
:HDWKHU
&OHDU:&
7HPSHUDWXUH)
:LQG
1(#03+
'D\V/7,GD\V 'D\V5,GD\V 32%
6DIHW\,QFLGHQWV1HDU0LVV
'DWH
&DWHJRU\ 7\SH 6XEW\SH 6HYHULW\ &DXVH /RVWWLPH"
1R
&RPPHQW
=HUR+6(,QFLGHQWV5HYLHZHGWKH&
VZLWKDIRFXVRQ6DIHW\&XOWXUH5HYLHZHG(QL*ROGHQ5XOHVZLWKDIRFXVRQ+HDOWK0DQDJHPHQW
6DIHW\'ULOOV
7\SH 2FFXU /DVW'DWH 1H[W'DWH
'D\V8QWLO1H[W&KHFN
GD\V
5LJ,QVSHFWLRQ
6DIHW\0HHWLQJ
6SLOO'ULOO
775LJ)LUH'ULOO
&DVLQJVVHDW
&DV7\SH 2'LQ ,'LQ *UDGH 7RSIW.% %RWWRPIW.% 79'%RWIW.% /DQGLQJ'DWH
&21'8&725
&$6,1* /
&$6,1* /
/,1(5
/,1(5 /
/DVW&HPHQWLQJ
&HPHQWLQJ6WDUW'DWH6WULQJ/,1(5IW.%&RPPHQW;OLQHUKDQJHUSDFNHUVHWLQVLGHOLQHU72OLQHU#
EWPRIIORDWVKRH#
6WJ 7RSIW.% 7RS0HDV0HWK %WPIW.% &RP
6/%7HVWOLQHVWRSVL6/%SXPSEEOV0XG3XVKEEOVFHPHQWGURSZLSHUEDOOEEOV
0XG3XVKDQGULJGLVSODFHZEEOVVOLFNZDWHU6WLQJLQWROLQHUSDFNHUDQGVTXHH]HFHPHQWZEEOVRIVOLFN
ZDWHU&,3#KUV
-RE,QIRUPDWLRQ
-RE3KDVH
:25.29(5
3ODQQHG6WDUW'DWH
6WDUW'DWH
(QG'DWH 3'XUDWLRQGD\V
'DLO\6XPPDU\2SHUDWLRQV
K)RUHFDVW
0RQLWRUZHOOSUHSDULQJEULQHWRNLOOZHOO3HUIRUPNLOORSHUDWLRQSHUSURFHGXUH
K6XPPDU\
%OHHGDQGPRQLWRUZHOOSUHVVXUHDIWHUEXOOKHDGLQJDQGFLUFXODWHZLWKKHDYLHUEULQHSHUSURFHGXUHV
2SHUDWLRQDW
%OHHG:HOODQG0RQLWRU
7LPH/RJ
6WDUW
7LPH
(QG
7LPH 'XUKU
&XP'XU
KU3KDVH 2SU $FW 3ODQ 2SHU'HVFU
:2 0 3 3-60±0RQLWRUZHOOSUHVVXUHVKXWLQDIWHUEXOOKHDGLQJSSJ.&/1D&OZLWKELRFLGH7KHWXELQJDQG$DQQXOXV
WUDFNHGWRJHWKHUZLWKSUHVVXUHGURSVWXELQJISVLWSVL$DQQXOXVISVLWSVL:KLOHWKH%DQQXOXV
UHPDLQHGFRQVWDQW#SVL
:2 0 3 3-60±58EOHHGOLQHVRQWXELQJWREOHHGWDQNDQG$DQQXOXVWRSURGXFWLRQOHDGHUDQGEOHGRIIVLPXOWDQHRXVO\ZLWKSUHVVXUH
GURSVWXELQJSVLWSVL$DQQXOXVISVLWSVL%DQQXOXVLQFUHDVHGISVLWSVL
:2 0 7: :DWHU6RXUFH:HOOSXPSLVGRZQZDWHUVXSSO\IRU.LOOEULQHSUHSDUDWLRQIURP3URGXFWLRQLVVORZHGGRZQ0DLQWHQDQFHRQ
:DWHU6RXUFH:HOORQJRLQJ([WUHPHFROGZHDWKHUVORZGRZQNLOOEULQHSUHSDUDWLRQIXUWKHUO\1RWH&RQVWUXFWHGEHUPLQJ
DQGVSRWWLJHUWDQNLQVDPH58´KLJKSUHVVXUHVKROHVDQGEORZGRZQWRFRQILUPHGFOHDURILFHSOXJV
:2 0 3 3-60±6KXWLQDQGDWWDFKHG´+3OLQHIURPWXELQJWRWLJHUWDQNDQG$DQQXOXV´+3WRSURGXFWLRQKHDGHUWRWDQN0XG
3ODQWFRQWLQXHGWREXLOGSSJ.&/1D&OEULQHZLWKELRFLGHDGGHGZKHQSODQWUHFHLYHGIUHVKZDWHUIURPSURGXFWLRQ
:2 0 3 3-60±5HRSHQZHOOWREOHHGSUHVVXUHIURPWXELQJWRWLJHUWDQNDQG$DQQXOXVWRSURGXFWLRQ&RQWLQXHWRPRQLWRUSUHVVXUH
GURSVWXELQJSVLWSVL$DQQXOXVISVLWSVL%DQQXOXVLQFUHDVHGISVLWSVLWRRULJLQDOSUHVVXUH
EHIRUHEXOOKHDGLQJ
:2 0 7: %XLOGSSJ.&/1D&OZLWKELRFLGHLQPXGSODQW:DWHU6RXUFH:HOOSXPSLVGRZQZDWHUVXSSO\IRU.LOOEULQH
SUHSDUDWLRQIURP3URGXFWLRQLVVORZHGGRZQ0DLQWHQDQFHRQ:DWHU6RXUFH:HOORQJRLQJ([WUHPHFROGZHDWKHUVORZ
GRZQNLOOEULQHSUHSDUDWLRQIXUWKHUO\
:2 0 3 6KXWLQZHOOWRPRQLWRU±REVHUYHGSUHVVXUHLQFUHDVHGWXELQJISVLWSVL$DQQXOXVLQFUHDVHGISVL
WSVL7KH%DQQXOXVUHPDLQHGWKHVDPH#SVL
:2 0 3 3-60±3XPSEEOVRISSJ.&/1D&OZLWKELRFLGHGRZQ$DQQXOXVZLWKDUDWHRIESPZLWK
UHWXUQVRXWWKHWXELQJWRWLJHUWDQN3XPSSUHVVXUHWXELQJ,&3 SVL)&3 SVL$DQQXOXV,&3
SVL)&3 SVL%DQQXOXVLQFUHDVHGISVLWSVL&DOFXODWHGIOXLGUHWXUQZKLOHSXPSLQJZDV
6KXWGRZQSUHVVXUHGURSSHGWXELQJSVL$DQQXOXVSVL%DQQXOXV#SVL1RWH0XGSODQW
EXLOGLQJSSJEULQH
:2 0 3 0RQLWRUSUHVVXUHEOHHGWRWLJHUWDQNWXELQJISVLWSVL$DQQXOXVISVLWSVL%DQQXOXV
UHPDLQHGWKHVDPH#SVL
:2 0 3 3-60±3XPSEEOVRISSJ.&/1D&OZLWKELRFLGHGRZQ$DQQXOXVZLWKDUDWHRIESPZLWK
UHWXUQVRXWWKHWXELQJWRWLJHUWDQN3XPSSUHVVXUHWXELQJ,&3 SVL)&3 SVL$DQQXOXV,&3
SVL)&3 SVL%DQQXOXVGHFUHDVHGISVLWSVL6KXWGRZQSUHVVXUHGURSWXELQJSVL$
DQQXOXVSVL%DQQXOXV#SVLZLWKSXPSVRII&DOFXODWHGIOXLGUHWXUQZKLOHSXPSLQJ
:2 0 3 &RQWLQXHWREOHHGLQJWKHWXELQJWRWLJHUWDQNISVLWSVL$DQQXOXVSVLWSVL%DQQXOXV
LQFUHDVHGISVLWSVL
:2 0 7: 6KXWLQZHOOPRQLWRULQJSUHVVXUH±REVHUYHGWXELQJSVLWSVL$DQQXOXVISVLWSVLWKH%DQQXOXVLQFUHDVHG
ISVLWSVL0XGSODQWEXLOGLQJEDWFKRIEEOVSSJ.&/1D&OEULQHZLWKELRFLGH:DWHU6RXUFH:HOO
SXPSLVGRZQZDWHUVXSSO\IRU.LOOEULQHSUHSDUDWLRQIURP3URGXFWLRQLVVORZHGGRZQ0DLQWHQDQFHRQ:DWHU6RXUFH:HOO
RQJRLQJ([WUHPHFROGZHDWKHUVORZGRZQNLOOEULQHSUHSDUDWLRQIXUWKHUO\
*DV5HDGLQJV
$YJ%DFNJURXQG*DV 0D[%DFNJURXQG*DV $YJ&RQQHFWLRQ*DV 0D[&RQQHFWLRQ*DV
$YJ'ULOO*DV 0D['ULOO*DV $YJ7ULS*DV 0D[7ULS*DV
'DLO\0XG9ROXPHV
7DQN$GGLWLRQ/RVV 7\SH 'HV 9ROXPHEEO
7DQN
:HOO1DPH63)125
:HOOERUH1DPH63)1
:HOO&RGH
-RE:25.29(5
:&(,/(9(/
'DLO\5HSRUW
'DWH
5HSRUW
3DJHRI
'DLO\0XG9ROXPHV
7DQN$GGLWLRQ/RVV 7\SH 'HV 9ROXPHEEO
+ROH
/RVV
&XPXODWLYH0XG9ROXPHV
$FWLYH9ROXPHEEO
+ROH9ROXPHEEO
$GGLWLRQVEEO
&XP$GGLWLRQVEEO
/RVVHVEEO
&XP/RVVHVEEO
'DLO\&RQWDFWV
3RVLWLRQ &RQWDFW1DPH &RPSDQ\ 7LWOH (PDLO 2IILFH 0RELOH
(QLUHSUHVHQWDWLYH %UXFH6LPRQVRQ $65&(QHUJ\6HUYLFHV 'ULOOLQJ6XSY VLGGULOOLQJ#HQLFRP
(QLUHSUHVHQWDWLYH 'DYLG6PLWK $65&(QHUJ\6HUYLFHV 'ULOOLQJ6XSYVLGGULOOLQJ#HQLFRP
(QLUHSUHVHQWDWLYH &KDG*XHFR $65&(QHUJ\6HUYLFHV 'ULOOLQJ6XSY VLGGULOOLQJ#HQLFRP
(QLUHSUHVHQWDWLYH :DGH7KRPDV $65&(QHUJ\6HUYLFHV 5LJ&OHUN $.5LJ&OHUNV'R\RQ#HQLFRP
(QLUHSUHVHQWDWLYH 0DUN+XEOHU %HDFRQ +6( PDUNKXEOHU#H[WHUQDOHQLFRP
7RRO3XVK 9LNWRU7RUUHV 'R\RQ'ULOOLQJ 7RRO3XVKHU ULJ#GR\RQGULOOLQJFRP
7RRO3XVK 7HG.UXJHU 'R\RQ'ULOOLQJ 7RXU3XVKHU ULJ#GR\RQGULOOLQJFRP
6DIHW\5HSUHVHQWDWLYH +DUROG5LFKDUGVRQ 'R\RQ'ULOOLQJ +6( KULFKDUGVRQ#GR\RQGULOOLQJFRP
6DIHW\5HSUHVHQWDWLYH 'DYH6HQD 'R\RQ'ULOOLQJ +6( GVHQD#GR\RQGULOOLQJFRP
3HUVRQQHO/RJ32%
&RPSDQ\ 6HUY7\SH :RUN+KU 6WDQGE\+KU &RXQW 1RWH
$65&(QHUJ\6HUYLFHV 5LJFOHUN
$65&(QHUJ\6HUYLFHV 62$
$65&(QHUJ\6HUYLFHV /LIW$GYLVRU
%($&21 +6(
&203(7(17,$ )XHOHU
9HWFR :HOOKHDG
7$0 3DFNHUV
$65&(QHUJ\6HUYLFHV &RPSDQ\PDQ
+$//,%85721 0XG/RJJHUV
6&+/80%(5*(5 6/%0,6ZDFR0XG(QJLQHHU
6&+/80%(5*(5 &HPHQW
/LWWOH5HG6HUYLFHV 3XPSLQJ
*%5 &DVLQJ6HUYLFH
%DNHU+XJKHV &RPSOHWLRQV
6&+/80%(5*(5 6/%0,6ZDFR0XGSODQW
6&+/80%(5*(5 6/%:,)
(;352 :HOO)ORZ
:25/(< 5LJ6XSSRUW
'2<21 2QVKRUH5LJ
%236WDFN &RPSRQHQWV
'HVFULSWLRQ
%236WDFN
6WDUW'DWH
/DVW&HUWLILFDWLRQ'DWH
3UHVVXUH5DWLQJSVL
7\SH 0DNH 0RGHO ,'1RPLQ 35DQJHSVL /DVW&HUW'DWH
$QQXODU +\GULO *.
;9%5
V +\GULO 03/
%OLQG6KHDU5DP +\GULO 03/
[9%5V +\GULO 03/
6ORZ&LUFXODWLRQ5DWHV
3XPS1XPEHU 0DNH0RGHO
6WDUW'DWH (QG'DWH /LQHU6L]HLQ 9ROXPH3HU6WURNH2YHUULGHEEOVWN 0D[3UHVVXUHSVL
'DWH 'HSWKIW.% 6ORZ6SG 6WURNHVVSP 3SVL (II 4)ORZJSP
'DLO\%XON
6XSSO\,WHP'HVFULSWLRQ(TXLSPHQW)XHO 8QLW/DEHO*DO 8QLW6L]H1RWH
'DWH
&RQVXPHG
5HFHLYHG
5HWXUQHG &XP&RQVXPHG
&XP5HFHLYHG
&XP5HWXUQHG
&XP2Q/RF
1RWH
6XSSO\,WHP'HVFULSWLRQ0XG3ODQW%RLOHUV 8QLW/DEHO*DO 8QLW6L]H 1RWH
'DWH
&RQVXPHG
5HFHLYHG
5HWXUQHG &XP&RQVXPHG
&XP5HFHLYHG
&XP5HWXUQHG
&XP2Q/RF
1RWH
6XSSO\,WHP'HVFULSWLRQ5LJ)XHO 8QLW/DEHOJDOXV 8QLW6L]H1RWH
'DWH
&RQVXPHG
5HFHLYHG
5HWXUQHG &XP&RQVXPHG
&XP5HFHLYHG
&XP5HWXUQHG
&XP2Q/RF
1RWH
6XSSO\,WHP'HVFULSWLRQ5LJ:DWHU 8QLW/DEHOEEO 8QLW6L]H1RWH
'DWH
&RQVXPHG
5HFHLYHG
5HWXUQHG &XP&RQVXPHG
&XP5HFHLYHG
&XP5HWXUQHG
&XP2Q/RF
1RWH
6XSSO\,WHP'HVFULSWLRQ:,)%RLOHUV 8QLW/DEHO*DO 8QLW6L]H 1RWH
'DWH
&RQVXPHG
5HFHLYHG
5HWXUQHG &XP&RQVXPHG
&XP5HFHLYHG
&XP5HWXUQHG
&XP2Q/RF
1RWH
/DVW$XWKRULW\9LVLW
'DWH 7RWLQVS1EU 7RWDO,1&QXPEHU &RPPHQW
6723&DUGV6XEPLWWHG
&RPSDQ\ 5SWV &RP
'R\RQ'ULOOLQJ,QF +D]DUG,'
'R\RQ'ULOOLQJ,QF6WRS:RUN
'R\RQ'ULOOLQJ,QF3-60
V
'R\RQ'ULOOLQJ,QF 2EVHUYDWLRQV
([SUR 2EVHUYDWLRQV
([SUR +D]DUG,'
0,6ZDFR +D]DUG,'
0,6ZDFR 2EVHUYDWLRQV
0,6ZDFR 0HQWRULQJ
:RUOH\ 6WRS:RUN
:RUOH\ 2EVHUYDWLRQV
*HQHUDO1RWHV
&RPPHQW
:HOO1DPH63)125
:HOOERUH1DPH63)1
:HOO&RGH
-RE:25.29(5
:&(,/(9(/
'DLO\5HSRUW
'DWH
5HSRUW
3DJHRI
:HOO+HDGHU
3HUPLW&RQFHVVLRQ1
$'/
2SHUDWRU
(1,3(752/(80
6XEVLGLDU\
(1,3HWUROHXP&R,QF
,QLWLDO/DKHH&RGH
'(9(/230(17:(//
5RWDU\7DEOH(OHYDWLRQIW
*URXQG/HYHOIW )LUVW)ODQJHIW
5.%%DVH)ODQJHIW
5.%7XELQJ6SRROIW
5LJV
5LJ1DPH
5,*
&RQWUDFWRU
'2<21
5LJ7\SH
/$1'5,*
5LJ1XP
5LJ6WDUW'DWH
5LJ5HOHDVH'DWH
'DLO\,QIRUPDWLRQ
:HDWKHU
&OHDU:&
7HPSHUDWXUH)
:LQG
6:#03+
'D\V/7,GD\V 'D\V5,GD\V 32%
6DIHW\,QFLGHQWV1HDU0LVV
'DWH
&DWHJRU\ 7\SH 6XEW\SH 6HYHULW\ &DXVH /RVWWLPH"
1R
&RPPHQW
=HUR+6(,QFLGHQWV5HYLHZHGWKH&
VZLWKDIRFXVRQ:RUNSODFH'LVWUDFWLRQ5HYLHZHG(QL*ROGHQ5XOHVZLWKDIRFXVRQ3HUPLWWR:RUN
6DIHW\'ULOOV
7\SH 2FFXU /DVW'DWH 1H[W'DWH
'D\V8QWLO1H[W&KHFN
GD\V
5LJ,QVSHFWLRQ
6DIHW\0HHWLQJ
6SLOO'ULOO
77+6'ULOO
775LJ(YDF'ULOO
775LJ)LUH'ULOO
&DVLQJVVHDW
&DV7\SH 2'LQ ,'LQ *UDGH 7RSIW.% %RWWRPIW.% 79'%RWIW.% /DQGLQJ'DWH
&21'8&725
&$6,1* /
&$6,1* /
/,1(5
/,1(5 /
/DVW&HPHQWLQJ
&HPHQWLQJ6WDUW'DWH6WULQJ/,1(5IW.%&RPPHQW;OLQHUKDQJHUSDFNHUVHWLQVLGHOLQHU72OLQHU#
EWPRIIORDWVKRH#
6WJ 7RSIW.% 7RS0HDV0HWK %WPIW.% &RP
6/%7HVWOLQHVWRSVL6/%SXPSEEOV0XG3XVKEEOVFHPHQWGURSZLSHUEDOOEEOV
0XG3XVKDQGULJGLVSODFHZEEOVVOLFNZDWHU6WLQJLQWROLQHUSDFNHUDQGVTXHH]HFHPHQWZEEOVRIVOLFN
ZDWHU&,3#KUV
-RE,QIRUPDWLRQ
-RE3KDVH
:25.29(5
3ODQQHG6WDUW'DWH
6WDUW'DWH
(QG'DWH 3'XUDWLRQGD\V
'DLO\6XPPDU\2SHUDWLRQV
K)RUHFDVW
0RQLWRUZHOO±2SHUDWLRQVKXWGRZQWRH[WUHPHFROGZHDWKHUFRQGLWLRQ
K6XPPDU\
0RQLWRUEOHHGZHOOSUHVVXUH±3UHSDUDWLRQRIEULQHNLOOIOXLGVUHVWULFWHGE\SURGXFWLRQZDWHUVRXUFHDQGH[WUHPHZHDWKHUWHPSHUDWXUHFRQGLWLRQ
2SHUDWLRQDW
0RQLWRULQJ:HOO
7LPH/RJ
6WDUW
7LPH
(QG
7LPH 'XUKU
&XP'XU
KU3KDVH 2SU $FW 3ODQ 2SHU'HVFU
:2 0 7: 3-606KXWLQZHOOPRQLWRULQJSUHVVXUH±REVHUYHGWXELQJSVLWSVL$DQQXOXVISVLWSVL%DQQXOXV
UHPDLQHG#SVL0XGSODQWDUHEXLOGLQJEDWFKRIEEOVSSJ.&/1D&OEULQHZLWKELRFLGH:DWHU6RXUFH:HOO
SXPSLVGRZQZDWHUVXSSO\IRU.LOOEULQHSUHSDUDWLRQIURPSURGXFWLRQUHGXFHGWRFDSDFLW\0DLQWHQDQFHRQ:DWHU
6RXUFH:HOOLVRQJRLQJ([WUHPHFROGZHDWKHUFRQGLWLRQLVVORZLQJGRZQSUHSDUDWLRQRINLOOZHLJKWEULQHIXUWKHU
:2 0 7: 3-60±0RQLWRUZHOOSUHVVXUHWXELQJ SVL$DQQXOXV SVL%DQQXOXV SVL%OHHGRIIJDVHYHU\KRXUV
WRWKHWLJHUWDQNLIUHTXLUHGKLJKHVWSVLRQWXELQJVLGHWKH$DQQXOXVUHPDLQHGWKHVDPH0XGSODQWUHFHLYLQJVPDOO
EDWFKHVRIIUHVKZDWHUIURPSURGXFWLRQDVFRXOGSURGXFH1RWHKUVORVV EEOV7RWDOORVV EEOV.&/1D&O
EULQH
1RWH2SHUDWLRQVXVSHQGHGDQGRQKROGGXHWRH[WUHPHFROGZHDWKHU)ZLWKZLQGFKLOOIDFWRURI) *DV5HDGLQJV
$YJ%DFNJURXQG*DV 0D[%DFNJURXQG*DV $YJ&RQQHFWLRQ*DV 0D[&RQQHFWLRQ*DV
$YJ'ULOO*DV 0D['ULOO*DV $YJ7ULS*DV 0D[7ULS*DV
'DLO\0XG9ROXPHV
7DQN$GGLWLRQ/RVV 7\SH 'HV 9ROXPHEEO
7DQN
+ROH
/RVV
&XPXODWLYH0XG9ROXPHV
$FWLYH9ROXPHEEO
+ROH9ROXPHEEO
$GGLWLRQVEEO
&XP$GGLWLRQVEEO
/RVVHVEEO
&XP/RVVHVEEO
'DLO\&RQWDFWV
3RVLWLRQ &RQWDFW1DPH &RPSDQ\ 7LWOH (PDLO 2IILFH 0RELOH
(QLUHSUHVHQWDWLYH %UXFH6LPRQVRQ $65&(QHUJ\6HUYLFHV 'ULOOLQJ6XSY VLGGULOOLQJ#HQLFRP
(QLUHSUHVHQWDWLYH 'DYLG6PLWK $65&(QHUJ\6HUYLFHV 'ULOOLQJ6XSYVLGGULOOLQJ#HQLFRP
(QLUHSUHVHQWDWLYH &KDG*XHFR $65&(QHUJ\6HUYLFHV 'ULOOLQJ6XSY VLGGULOOLQJ#HQLFRP
(QLUHSUHVHQWDWLYH :DGH7KRPDV $65&(QHUJ\6HUYLFHV 5LJ&OHUN $.5LJ&OHUNV'R\RQ#HQLFRP
(QLUHSUHVHQWDWLYH 0DUN+XEOHU %HDFRQ +6( PDUNKXEOHU#H[WHUQDOHQLFRP
7RRO3XVK 9LNWRU7RUUHV 'R\RQ'ULOOLQJ 7RRO3XVKHU ULJ#GR\RQGULOOLQJFRP
7RRO3XVK (LQHU)OHDJOH 'R\RQ'ULOOLQJ 7RXU3XVKHU ULJ#GR\RQGULOOLQJFRP
6DIHW\5HSUHVHQWDWLYH +DUROG5LFKDUGVRQ 'R\RQ'ULOOLQJ +6( KULFKDUGVRQ#GR\RQGULOOLQJFRP
6DIHW\5HSUHVHQWDWLYH 'DYH6HQD 'R\RQ'ULOOLQJ +6( GVHQD#GR\RQGULOOLQJFRP
3HUVRQQHO/RJ32%
&RPSDQ\ 6HUY7\SH :RUN+KU 6WDQGE\+KU &RXQW 1RWH
/LWWOH5HG6HUYLFHV 3XPSLQJ
$65&(QHUJ\6HUYLFHV 5LJFOHUN
:HOO1DPH63)125
:HOOERUH1DPH63)1
:HOO&RGH
-RE:25.29(5
:&(,/(9(/
'DLO\5HSRUW
'DWH
5HSRUW
3DJHRI
3HUVRQQHO/RJ32%
&RPSDQ\ 6HUY7\SH :RUN+KU 6WDQGE\+KU &RXQW 1RWH
$65&(QHUJ\6HUYLFHV 62$
$65&(QHUJ\6HUYLFHV /LIW$GYLVRU
%($&21 +6(
&203(7(17,$ )XHOHU
7HQDULV 7KUHDG5HS
7$0 3DFNHU5HS
$65&(QHUJ\6HUYLFHV &RPSDQ\PDQ
+$//,%85721 0XG/RJJHUV
6&+/80%(5*(5 6/%0,6ZDFR0XG(QJLQHHU
6&+/80%(5*(5 &HPHQW
9HWFR :HOOKHDG
*%5 &DVLQJ6HUYLFH
%DNHU+XJKHV &RPSOHWLRQV
6&+/80%(5*(5 6/%0,6ZDFR0XGSODQW
6&+/80%(5*(5 6/%:,)
(;352 :HOO)ORZ
:25/(< 5LJ6XSSRUW
'2<21 2QVKRUH5LJ
%236WDFN &RPSRQHQWV
'HVFULSWLRQ
%236WDFN
6WDUW'DWH
/DVW&HUWLILFDWLRQ'DWH
3UHVVXUH5DWLQJSVL
7\SH 0DNH 0RGHO ,'1RPLQ 35DQJHSVL /DVW&HUW'DWH
$QQXODU +\GULO *.
;9%5
V +\GULO 03/
%OLQG6KHDU5DP +\GULO 03/
[9%5V +\GULO 03/
6ORZ&LUFXODWLRQ5DWHV
3XPS1XPEHU 0DNH0RGHO
6WDUW'DWH (QG'DWH /LQHU6L]HLQ 9ROXPH3HU6WURNH2YHUULGHEEOVWN 0D[3UHVVXUHSVL
'DWH 'HSWKIW.% 6ORZ6SG 6WURNHVVSP 3SVL (II 4)ORZJSP
'DLO\%XON
6XSSO\,WHP'HVFULSWLRQ(TXLSPHQW)XHO 8QLW/DEHO*DO 8QLW6L]H1RWH
'DWH
&RQVXPHG
5HFHLYHG
5HWXUQHG &XP&RQVXPHG
&XP5HFHLYHG
&XP5HWXUQHG
&XP2Q/RF
1RWH
6XSSO\,WHP'HVFULSWLRQ0XG3ODQW%RLOHUV 8QLW/DEHO*DO 8QLW6L]H 1RWH
'DWH
&RQVXPHG
5HFHLYHG
5HWXUQHG &XP&RQVXPHG
&XP5HFHLYHG
&XP5HWXUQHG
&XP2Q/RF
1RWH
6XSSO\,WHP'HVFULSWLRQ5LJ)XHO 8QLW/DEHOJDOXV 8QLW6L]H1RWH
'DWH
&RQVXPHG
5HFHLYHG
5HWXUQHG &XP&RQVXPHG
&XP5HFHLYHG
&XP5HWXUQHG
&XP2Q/RF
1RWH
6XSSO\,WHP'HVFULSWLRQ5LJ:DWHU 8QLW/DEHOEEO 8QLW6L]H1RWH
'DWH
&RQVXPHG
5HFHLYHG
5HWXUQHG &XP&RQVXPHG
&XP5HFHLYHG
&XP5HWXUQHG
&XP2Q/RF
1RWH
6XSSO\,WHP'HVFULSWLRQ:,)%RLOHUV 8QLW/DEHO*DO 8QLW6L]H 1RWH
'DWH
&RQVXPHG
5HFHLYHG
5HWXUQHG &XP&RQVXPHG
&XP5HFHLYHG
&XP5HWXUQHG
&XP2Q/RF
1RWH
/DVW$XWKRULW\9LVLW
'DWH 7RWLQVS1EU 7RWDO,1&QXPEHU &RPPHQW
6723&DUGV6XEPLWWHG
&RPSDQ\ 5SWV &RP
'R\RQ'ULOOLQJ,QF +D]DUG,'
'R\RQ'ULOOLQJ,QF2EVHUYDWLRQV
'R\RQ'ULOOLQJ,QF6WRS:RUN
'R\RQ'ULOOLQJ,QF3-60
V
([SUR +D]DUG,'
([SUR 2EVHUYDWLRQV
+DOOLEXUWRQ 2EVHUYDWLRQV
0,6ZDFR +D]DUG,'
0,6ZDFR 0HQWRULQJ
0,6ZDFR 2EVHUYDWLRQV
:RUOH\ 2EVHUYDWLRQV
:RUOH\ 6WRS:RUN
*HQHUDO1RWHV
&RPPHQW
:HOO1DPH63)125
:HOOERUH1DPH63)1
:HOO&RGH
-RE:25.29(5
:&(,/HYHO/(9(/
'DLO\5HSRUW
'DWH
5HSRUW
3DJHRI
:HOO+HDGHU
3HUPLW&RQFHVVLRQ1
$'/
2SHUDWRU
(1,3(752/(80
6XEVLGLDU\
(1,3HWUROHXP&R,QF
,QLWLDO/DKHH&RGH
'(9(/230(17:(//
5RWDU\7DEOH(OHYDWLRQIW
*URXQG/HYHOIW )LUVW)ODQJHIW
5.%%DVH)ODQJHIW
5.%7XELQJ6SRROIW
5LJV
5LJ1DPH
5,*
&RQWUDFWRU
'2<21
5LJ7\SH
/$1'5,*
5LJ1XP
5LJ6WDUW'DWH
5LJ5HOHDVH'DWH
'DLO\,QIRUPDWLRQ
:HDWKHU
2YHUFDVW:&
7HPSHUDWXUH)
:LQG
6:#03+
'D\V/7,GD\V 'D\V5,GD\V 32%
6DIHW\,QFLGHQWV1HDU0LVV
'DWH
&DWHJRU\ 7\SH 6XEW\SH 6HYHULW\ &DXVH /RVWWLPH"
1R
&RPPHQW
=HUR+6(,QFLGHQWV5HYLHZHGWKH&
VZLWKDIRFXVRQ0DQDJHPHQWRI&KDQJH5HYLHZHG(QL*ROGHQ5XOHVZLWKDIRFXVRQ)LUH6DIHW\
6DIHW\'ULOOV
7\SH 2FFXU /DVW'DWH 1H[W'DWH
'D\V8QWLO1H[W&KHFN
GD\V
5LJ,QVSHFWLRQ
6DIHW\0HHWLQJ
6SLOO'ULOO
77+6'ULOO
770DQ'RZQ'ULOO
775LJ(YDF'ULOO
775LJ)LUH'ULOO
&DVLQJVVHDW
&DV7\SH 2'LQ ,'LQ *UDGH 7RSIW.% %RWWRPIW.% 79'%RWIW.% /DQGLQJ'DWH
&21'8&725
&$6,1* /
&$6,1* /
/,1(5
/,1(5 /
/DVW&HPHQWLQJ
&HPHQWLQJ6WDUW'DWH6WULQJ/,1(5IW.%&RPPHQW;OLQHUKDQJHUSDFNHUVHWLQVLGHOLQHU72OLQHU#
EWPRIIORDWVKRH#
6WJ 7RSIW.% 7RS0HDV0HWK %WPIW.% &RP
6/%7HVWOLQHVWRSVL6/%SXPSEEOV0XG3XVKEEOVFHPHQWGURSZLSHUEDOOEEOV
0XG3XVKDQGULJGLVSODFHZEEOVVOLFNZDWHU6WLQJLQWROLQHUSDFNHUDQGVTXHH]HFHPHQWZEEOVRIVOLFN
ZDWHU&,3#KUV
-RE,QIRUPDWLRQ
-RE3KDVH
:25.29(5
3ODQQHG6WDUW'DWH
6WDUW'DWH
(QG'DWH 3'XUDWLRQGD\V
'DLO\6XPPDU\2SHUDWLRQV
K)RUHFDVW
0RQLWRUZHOO±([WUHPHFROGZHDWKHUFRQGLWLRQDQGOLPLWHGZDWHUYROXPHWRSUHSDUHNLOOEULQH
K6XPPDU\
0RQLWRUEOHHGZHOOSUHVVXUH±&RQWLQXHGH[WUHPHZHDWKHUWHPSHUDWXUHFRQGLWLRQVDQGUHVWULFWHGZDWHUVRXUFHIURPSURGXFWLRQIRUSUHSDUDWLRQRINLOOZHLJKWEULQH
2SHUDWLRQDW
0RQLWRULQJ:HOO
7LPH/RJ
6WDUW
7LPH
(QG
7LPH 'XUKU
&XP'XU
KU3KDVH 2SU $FW 3ODQ 2SHU'HVFU
:2 0 7: 3-60±0RQLWRUVKXWLQZHOOSUHVVXUHWXELQJ SVL$DQQXOXV SVL%DQQXOXV SVL%OHHGRIIJDVHYHU\
KRXUVIRUPLQXWHVSHULRGWRWKHWLJHUWDQNLIUHTXLUHGKLJKHVWRQWXELQJVLGHZDVSVL$DQQXOXVUHPDLQHGWKHVDPH
SVL0XGSODQWUHFHLYLQJRQO\EEOEDWFKHVRIIUHVKZDWHUIURPSURGXFWLRQGXHWR:DWHU6RXUFH:HOOSXPSGRZQ
FDSDFLW\WRSURYLGHGVXSSO\1RWH:HDWKHUFRQGLWLRQVWLOOZLWKH[WUHPHFROGDPELHQWWHPSHUDWXUHRIPLQXVVORZLQJ
GRZQRSHUDWLRQRIHTXLSPHQW
:2 0 7: 3-60±&RQWLQXHGPRQLWRULQJVKXWLQZHOOSUHVVXUH±REVHUYHGWXELQJSVL$DQQXOXVSVL%DQQXOXVUHPDLQ
FRQVWDQW#SVL/DVWEOHHGRIIRQWXELQJZLWKSVL#KUV3URGXFWLRQFRQWLQXHGSURYLGHEEOVEDWFKHVRI
IUHVKZDWHUZLWKRQO\RQH:DWHU6RXUFH:HOOSXPSZKHQDYDLODEOH0XGSODQWEXLOWEEOEDWFKHVRI.&/1D&OZLWK
ELRFLGHEULQHDWSSJNLOOZHLJKW7KHH[WUHPHFROGZHDWKHUORZDPELHQWWHPSHUDWXUHVUHGXFHWKHFDSDELOLW\1RWHKUV
ORVV EEOV7RWDOORVV EEOV.&/1D&OEULQH
1RWH2SHUDWLRQVXVSHQGHGDQGRQKROGGXHWRH[WUHPHFROGZHDWKHU)ZLWKZLQGFKLOOIDFWRURI)
2SHUDWLRQIURPWR
6WDUW
7LPH
(QG
7LPH 'XUKU
&XP'XU
KU3KDVH 2SU $FW 3ODQ 2SHU'HVFU
:2 0 7: 3-60±0RQLWRUVKXWLQZHOOSUHVVXUHWXELQJ ISVL±W$DQQXOXV ISVL±W%DQQXOXV SVL
0XGSODQWUHFHLYLQJRQO\EEORIIUHVKZDWHUIURPSURGXFWLRQGXHWR:DWHU6RXUFH:HOOSXPSGRZQ1RWH:HDWKHU
FRQGLWLRQLPSURYHGZLWKDPELHQWWHPSHUDWXUHDWPLQXVEXWZLQGFKLOOPLQXVVORZLQJRSHUDWLRQ
*DV5HDGLQJV
$YJ%DFNJURXQG*DV 0D[%DFNJURXQG*DV $YJ&RQQHFWLRQ*DV 0D[&RQQHFWLRQ*DV
$YJ'ULOO*DV 0D['ULOO*DV $YJ7ULS*DV 0D[7ULS*DV
'DLO\0XG9ROXPHV
7DQN$GGLWLRQ/RVV 7\SH 'HV 9ROXPHEEO
7DQN
+ROH
/RVV
&XPXODWLYH0XG9ROXPHV
$FWLYH9ROXPHEEO
+ROH9ROXPHEEO
$GGLWLRQVEEO
&XP$GGLWLRQVEEO
/RVVHVEEO
&XP/RVVHVEEO
'DLO\&RQWDFWV
3RVLWLRQ &RQWDFW1DPH &RPSDQ\ 7LWOH (PDLO 2IILFH 0RELOH
(QLUHSUHVHQWDWLYH %UXFH6LPRQVRQ $65&(QHUJ\6HUYLFHV 'ULOOLQJ6XSY VLGGULOOLQJ#HQLFRP
(QLUHSUHVHQWDWLYH 'DYLG6PLWK $65&(QHUJ\6HUYLFHV 'ULOOLQJ6XSYVLGGULOOLQJ#HQLFRP
(QLUHSUHVHQWDWLYH &KDG*XHFR $65&(QHUJ\6HUYLFHV 'ULOOLQJ6XSY VLGGULOOLQJ#HQLFRP
(QLUHSUHVHQWDWLYH :DGH7KRPDV $65&(QHUJ\6HUYLFHV 5LJ&OHUN $.5LJ&OHUNV'R\RQ#HQLFRP
(QLUHSUHVHQWDWLYH 0DUN+XEOHU %HDFRQ +6( PDUNKXEOHU#H[WHUQDOHQLFRP
:HOO1DPH63)125
:HOOERUH1DPH63)1
:HOO&RGH
-RE:25.29(5
:&(,/HYHO/(9(/
'DLO\5HSRUW
'DWH
5HSRUW
3DJHRI
'DLO\&RQWDFWV
3RVLWLRQ &RQWDFW1DPH &RPSDQ\ 7LWOH (PDLO 2IILFH 0RELOH
7RRO3XVK 9LNWRU7RUUHV 'R\RQ'ULOOLQJ 7RRO3XVKHU ULJ#GR\RQGULOOLQJFRP
7RRO3XVK (LQHU)OHDJOH 'R\RQ'ULOOLQJ 7RXU3XVKHU ULJ#GR\RQGULOOLQJFRP
6DIHW\5HSUHVHQWDWLYH +DUROG5LFKDUGVRQ 'R\RQ'ULOOLQJ +6( KULFKDUGVRQ#GR\RQGULOOLQJFRP
6DIHW\5HSUHVHQWDWLYH 'DYH6HQD 'R\RQ'ULOOLQJ +6( GVHQD#GR\RQGULOOLQJFRP
3HUVRQQHO/RJ32%
&RPSDQ\ 6HUY7\SH :RUN+KU 6WDQGE\+KU &RXQW 1RWH
/LWWOH5HG6HUYLFHV 3XPSLQJ
7HQDULV 7KUHDG5HS
$65&(QHUJ\6HUYLFHV 5LJFOHUN
$65&(QHUJ\6HUYLFHV 62$
$65&(QHUJ\6HUYLFHV /LIW$GYLVRU
%($&21 +6(
&203(7(17,$ )XHOHU
9HWFR :HOOKHDG
7$0 3DFNHU5HS
+$//,%85721 0XG/RJJHUV
6&+/80%(5*(5 6/%0,6ZDFR0XG(QJLQHHU
6&+/80%(5*(5 &HPHQW
*%5 &DVLQJ6HUYLFH
$65&(QHUJ\6HUYLFHV &RPSDQ\PDQ
%DNHU+XJKHV &RPSOHWLRQV
6&+/80%(5*(5 6/%0,6ZDFR0XGSODQW
6&+/80%(5*(5 6/%:,)
(;352 :HOO)ORZ
:25/(< 5LJ6XSSRUW
'2<21 2QVKRUH5LJ
%236WDFN &RPSRQHQWV
'HVFULSWLRQ
%236WDFN
6WDUW'DWH
/DVW&HUWLILFDWLRQ'DWH
3UHVVXUH5DWLQJSVL
7\SH 0DNH 0RGHO ,'1RPLQ 35DQJHSVL /DVW&HUW'DWH
$QQXODU +\GULO *.
;9%5
V +\GULO 03/
%OLQG6KHDU5DP +\GULO 03/
[9%5V +\GULO 03/
6ORZ&LUFXODWLRQ5DWHV
3XPS1XPEHU 0DNH0RGHO
6WDUW'DWH (QG'DWH /LQHU6L]HLQ 9ROXPH3HU6WURNH2YHUULGHEEOVWN 0D[3UHVVXUHSVL
'DWH 'HSWKIW.% 6ORZ6SG 6WURNHVVSP 3SVL (II 4)ORZJSP
'DLO\%XON
6XSSO\,WHP'HVFULSWLRQ(TXLSPHQW)XHO 8QLW/DEHO*DO 8QLW6L]H1RWH
'DWH
&RQVXPHG
5HFHLYHG
5HWXUQHG &XP&RQVXPHG
&XP5HFHLYHG
&XP5HWXUQHG
&XP2Q/RF
1RWH
6XSSO\,WHP'HVFULSWLRQ0XG3ODQW%RLOHUV 8QLW/DEHO*DO 8QLW6L]H 1RWH
'DWH
&RQVXPHG
5HFHLYHG
5HWXUQHG &XP&RQVXPHG
&XP5HFHLYHG
&XP5HWXUQHG
&XP2Q/RF
1RWH
6XSSO\,WHP'HVFULSWLRQ5LJ)XHO 8QLW/DEHOJDOXV 8QLW6L]H1RWH
'DWH
&RQVXPHG
5HFHLYHG
5HWXUQHG &XP&RQVXPHG
&XP5HFHLYHG
&XP5HWXUQHG
&XP2Q/RF
1RWH
6XSSO\,WHP'HVFULSWLRQ5LJ:DWHU 8QLW/DEHOEEO 8QLW6L]H1RWH
'DWH
&RQVXPHG
5HFHLYHG
5HWXUQHG &XP&RQVXPHG
&XP5HFHLYHG
&XP5HWXUQHG
&XP2Q/RF
1RWH
6XSSO\,WHP'HVFULSWLRQ:,)%RLOHUV 8QLW/DEHO*DO 8QLW6L]H 1RWH
'DWH
&RQVXPHG
5HFHLYHG
5HWXUQHG &XP&RQVXPHG
&XP5HFHLYHG
&XP5HWXUQHG
&XP2Q/RF
1RWH
/DVW$XWKRULW\9LVLW
'DWH 7RWLQVS1EU 7RWDO,1&QXPEHU &RPPHQW
6723&DUGV6XEPLWWHG
&RPSDQ\ 5SWV &RP
'R\RQ'ULOOLQJ,QF3-60
V
'R\RQ'ULOOLQJ,QF2EVHUYDWLRQV
'R\RQ'ULOOLQJ,QF6WRS:RUN
'R\RQ'ULOOLQJ,QF +D]DUG,'
([SUR 2EVHUYDWLRQV
([SUR +D]DUG,'
+DOOLEXUWRQ 2EVHUYDWLRQV
0,6ZDFR 2EVHUYDWLRQV
0,6ZDFR +D]DUG,'
0,6ZDFR 0HQWRULQJ
:RUOH\ 2EVHUYDWLRQV
:RUOH\6WRS:RUN
*HQHUDO1RWHV
&RPPHQW
:HOO1DPH63)125
:HOOERUH1DPH63)1
:HOO&RGH
-RE:25.29(5
:&(,/HYHO/(9(/
'DLO\5HSRUW
'DWH
5HSRUW
3DJHRI
:HOO+HDGHU
3HUPLW&RQFHVVLRQ1
$'/
2SHUDWRU
(1,3(752/(80
6XEVLGLDU\
(1,3HWUROHXP&R,QF
,QLWLDO/DKHH&RGH
'(9(/230(17:(//
5RWDU\7DEOH(OHYDWLRQIW
*URXQG/HYHOIW )LUVW)ODQJHIW
5.%%DVH)ODQJHIW
5.%7XELQJ6SRROIW
5LJV
5LJ1DPH
5,*
&RQWUDFWRU
'2<21
5LJ7\SH
/$1'5,*
5LJ1XP
5LJ6WDUW'DWH
5LJ5HOHDVH'DWH
'DLO\,QIRUPDWLRQ
:HDWKHU
&OHDU:&
7HPSHUDWXUH)
:LQG
1:#03+
'D\V/7,GD\V 'D\V5,GD\V 32%
6DIHW\,QFLGHQWV1HDU0LVV
'DWH
&DWHJRU\ 7\SH 6XEW\SH 6HYHULW\ &DXVH /RVWWLPH"
1R
&RPPHQW
=HUR+6(,QFLGHQWV5HYLHZHGWKH&
VZLWKDIRFXVRQ&RPPXQLFDWLRQ5HYLHZHG(QL*ROGHQ5XOHVZLWKDIRFXVRQ:RUNLQJDW+HLJKWV
6DIHW\'ULOOV
7\SH 2FFXU /DVW'DWH 1H[W'DWH
'D\V8QWLO1H[W&KHFN
GD\V
5LJ,QVSHFWLRQ
6DIHW\0HHWLQJ
6SLOO'ULOO
77+6'ULOO
770DQ'RZQ'ULOO
775LJ(YDF'ULOO
775LJ)LUH'ULOO
&DVLQJVVHDW
&DV7\SH 2'LQ ,'LQ *UDGH 7RSIW.% %RWWRPIW.% 79'%RWIW.% /DQGLQJ'DWH
&21'8&725
&$6,1* /
&$6,1* /
/,1(5
/,1(5 /
/DVW&HPHQWLQJ
&HPHQWLQJ6WDUW'DWH6WULQJ/,1(5IW.%&RPPHQW;OLQHUKDQJHUSDFNHUVHWLQVLGHOLQHU72OLQHU#
EWPRIIORDWVKRH#
6WJ 7RSIW.% 7RS0HDV0HWK %WPIW.% &RP
6/%7HVWOLQHVWRSVL6/%SXPSEEOV0XG3XVKEEOVFHPHQWGURSZLSHUEDOOEEOV
0XG3XVKDQGULJGLVSODFHZEEOVVOLFNZDWHU6WLQJLQWROLQHUSDFNHUDQGVTXHH]HFHPHQWZEEOVRIVOLFN
ZDWHU&,3#KUV
-RE,QIRUPDWLRQ
-RE3KDVH
:25.29(5
3ODQQHG6WDUW'DWH
6WDUW'DWH
(QG'DWH 3'XUDWLRQGD\V
'DLO\6XPPDU\2SHUDWLRQV
K)RUHFDVW
&LUFXODWHDQGPRQLWRUZHOO±1'DQG18±WHVW:HDWKHUFRQGLWLRQLPSURYLQJEXWOLPLWHGZDWHUYROXPHWRPL[NLOOEULQH
K6XPPDU\
0RQLWRUZHOOSUHVVXUHEXOOKHDGLQJDQGFLUFXODWHZHOODVSURFHGXUH:HDWKHUWHPSHUDWXUHFRQGLWLRQLPSURYLQJ6WLOOUHVWULFWHGZDWHUVRXUFHYROXPHVIURPSURGXFWLRQIRUSUHSDUDWLRQRINLOOZHLJKWEULQH
2SHUDWLRQDW
0RQLWRULQJ:HOO
7LPH/RJ
6WDUW
7LPH
(QG
7LPH 'XUKU
&XP'XU
KU3KDVH 2SU $FW 3ODQ 2SHU'HVFU
:2 0 7: 3-60±0RQLWRUVKXWLQZHOOSUHVVXUHWXELQJ ISVL±W$DQQXOXV ISVL±W%DQQXOXV SVL
0XGSODQWUHFHLYLQJRQO\EEORIIUHVKZDWHUIURPSURGXFWLRQGXHWR:DWHU6RXUFH:HOOSXPSGRZQ1RWH:HDWKHU
FRQGLWLRQLPSURYHGZLWKDPELHQWWHPSHUDWXUHDWPLQXVEXWZLQGFKLOOPLQXVVORZLQJRSHUDWLRQ
:2 0 3 3-60±58OLQHVWREXOOKHDGWHVWOLQHVWRSVL3XPSEEOVRISSJ.&/1D&OZLWKELRFLGHGRZQWXELQJUDWH
RIESP#,&3 SVL)&3 SVL$DQQXOXV,&3 SVL)&3 SVL%DQQXOXVLQFUHDVHGISVLW
SVL6KXWGRZQDQGVZLWFKYDOYHV0XGSODQWVWLOOUHGXFHSURGXFWLYHWREEOVVXSSO\OLPLW
:2 0 3 %XOOKHDGGRZQ$DQQXOXV3XPSEEOVRISSJ.&/1D&OZLWKELRFLGHGRZQUDWHRIESP7XELQJ,&3
SVL)&3 SVL$DQQXOXV,&3 SVL)&3 SVL%DQQXOXVLQFUHDVHGISVLWSVL6KXWLQDQG
PRQLWRUHGSUHVVXUHIRUPLQXWHVZLWK$DQQXOXVDQGWXELQJSUHVVXUHIDOOLQJWR36,%OHGSUHVVXUHRIIWR36,WR
WLJHUWDQNZLWKZLWKWXELQJDQG$DQQXOXVWUDFNLQJ6KXWLLQDQGPRQLWRUHGSUHVVXUHZLWKSUHVVXUHIDOOLQJWRYDFXXPRQERWK
WXELQJDQG$DQQXOXV
1RWH'LVFXVVHGLPSRUWDQFHRISURPSWUHSRUWLQJRIDQ\LQFLGHQWVXQZDQWHGHYHQWV
:2 0 3 3-60±3UHVVXUHWHVWOLQHVWRSVL6WDUWFLUFXODWHGRZQWXELQJZLWKDUDWHRIESPUHWXUQVIURP$DQQXOXVWRWKHWLJHU
WDQN7XELQJ,&3 SVL)&3 SVL$DQQXOXV,&3 SVL)&3 SVL%DQQXOXV,&3 SVL)&3
SVL0RQLWRUUHWXUQV7RWDOSXPSHGEEOVRIUHTXLUHGYROXPH
1RWHKUVORVV EEOV7RWDOORVV EEOV.&/1D&OEULQH
2SHUDWLRQIURPWR
6WDUW
7LPH
(QG
7LPH 'XUKU
&XP'XU
KU3KDVH 2SU $FW 3ODQ 2SHU'HVFU
:2 0 3 &RQWLQXHWRFLUFXODWH33*.&/1D&OEULQHZLWKELRFLGHGRZQWXELQJWDNLQJUHWXUQVIURP$DQQXOXVWRWLJHUWDQNDW
%30,&3DWEHJLQQLQJRIWRXU7%*36,$DQQXOXV36,%DQQXOXV36,)&3 7%*36,$DQQXOXV
36,%DQQXOXV36,7RWDOIOXLGSXPSHG%%/UHFRYHUHG%%/
:2 0 3 6KXWLQZHOODQGPRQLWRUHGZHOOZLWKSUHVVXUHVIDOOLQJWR7%*36,$DQQXOXV36,%DQQXOXV36,
:2 0 3 2SHQ%DQQXOXVDQGEOHGRLOFDSRIIWRWLJHUWDQNZLWKSUHVVXUHVIDOOLQJ7%*36,$DQQXOXV36,
:2 0 3 &RQWLQXHWRPRQLWRUZHOOZLWKERWKWXELQJDQG$DQQXOXVSUHVVXUHJRLQJRQYDFXXP:LWKWXELQJDQG$DQQXOXVSUHVVXUHVRQ
YDFXXPFRQWLQXHWRPRQLWRUIRUDQDGGLWLRQDOKRXUWRYHULI\ZHOOZDVGHDG1RWHDW+56SUHVVXUHZDV7%*36,$
DQQXOXV36,
*DV5HDGLQJV
$YJ%DFNJURXQG*DV 0D[%DFNJURXQG*DV $YJ&RQQHFWLRQ*DV 0D[&RQQHFWLRQ*DV
$YJ'ULOO*DV 0D['ULOO*DV $YJ7ULS*DV 0D[7ULS*DV
'DLO\0XG9ROXPHV
7DQN$GGLWLRQ/RVV 7\SH 'HV 9ROXPHEEO
7DQN
+ROH
/RVV
:HOO1DPH63)125
:HOOERUH1DPH63)1
:HOO&RGH
-RE:25.29(5
:&(,/HYHO/(9(/
'DLO\5HSRUW
'DWH
5HSRUW
3DJHRI
&XPXODWLYH0XG9ROXPHV
$FWLYH9ROXPHEEO
+ROH9ROXPHEEO
$GGLWLRQVEEO
&XP$GGLWLRQVEEO
/RVVHVEEO
&XP/RVVHVEEO
'DLO\&RQWDFWV
3RVLWLRQ &RQWDFW1DPH &RPSDQ\ 7LWOH (PDLO 2IILFH 0RELOH
(QLUHSUHVHQWDWLYH %UXFH6LPRQVRQ $65&(QHUJ\6HUYLFHV 'ULOOLQJ6XSY VLGGULOOLQJ#HQLFRP
(QLUHSUHVHQWDWLYH 'DYLG6PLWK $65&(QHUJ\6HUYLFHV 'ULOOLQJ6XSYVLGGULOOLQJ#HQLFRP
(QLUHSUHVHQWDWLYH &KDG*XHFR $65&(QHUJ\6HUYLFHV 'ULOOLQJ6XSY VLGGULOOLQJ#HQLFRP
(QLUHSUHVHQWDWLYH :DGH7KRPDV $65&(QHUJ\6HUYLFHV 5LJ&OHUN $.5LJ&OHUNV'R\RQ#HQLFRP
(QLUHSUHVHQWDWLYH 0DUN+XEOHU %HDFRQ +6( PDUNKXEOHU#H[WHUQDOHQLFRP
7RRO3XVK 9LNWRU7RUUHV 'R\RQ'ULOOLQJ 7RRO3XVKHU ULJ#GR\RQGULOOLQJFRP
7RRO3XVK (LQHU)OHDJOH 'R\RQ'ULOOLQJ 7RXU3XVKHU ULJ#GR\RQGULOOLQJFRP
6DIHW\5HSUHVHQWDWLYH +DUROG5LFKDUGVRQ 'R\RQ'ULOOLQJ +6( KULFKDUGVRQ#GR\RQGULOOLQJFRP
6DIHW\5HSUHVHQWDWLYH 'DYH6HQD 'R\RQ'ULOOLQJ +6( GVHQD#GR\RQGULOOLQJFRP
3HUVRQQHO/RJ32%
&RPSDQ\ 6HUY7\SH :RUN+KU 6WDQGE\+KU &RXQW 1RWH
/LWWOH5HG6HUYLFHV 3XPSLQJ
$65&(QHUJ\6HUYLFHV 5LJFOHUN
$65&(QHUJ\6HUYLFHV 62$
$65&(QHUJ\6HUYLFHV /LIW$GYLVRU
%($&21 +6(
&203(7(17,$ )XHOHU
9HWFR :HOOKHDG
7HQDULV 7KUHDG5HS
7$0 3DFNHU5HS
+$//,%85721 0XG/RJJHUV
6&+/80%(5*(5 6/%0,6ZDFR0XG(QJLQHHU
6&+/80%(5*(5 &HPHQW
*%5 &DVLQJ6HUYLFH
$65&(QHUJ\6HUYLFHV &RPSDQ\PDQ
%DNHU+XJKHV &RPSOHWLRQV
6&+/80%(5*(5 6/%0,6ZDFR0XGSODQW
6&+/80%(5*(5 6/%:,)
(;352 :HOO)ORZ
:25/(< 5LJ6XSSRUW
'2<21 2QVKRUH5LJ
%236WDFN &RPSRQHQWV
'HVFULSWLRQ
%236WDFN
6WDUW'DWH
/DVW&HUWLILFDWLRQ'DWH
3UHVVXUH5DWLQJSVL
7\SH 0DNH 0RGHO ,'1RPLQ 35DQJHSVL /DVW&HUW'DWH
$QQXODU +\GULO *.
;9%5
V +\GULO 03/
%OLQG6KHDU5DP +\GULO 03/
[9%5V +\GULO 03/
6ORZ&LUFXODWLRQ5DWHV
3XPS1XPEHU 0DNH0RGHO
6WDUW'DWH (QG'DWH /LQHU6L]HLQ 9ROXPH3HU6WURNH2YHUULGHEEOVWN 0D[3UHVVXUHSVL
'DWH 'HSWKIW.% 6ORZ6SG 6WURNHVVSP 3SVL (II 4)ORZJSP
'DLO\%XON
6XSSO\,WHP'HVFULSWLRQ(TXLSPHQW)XHO 8QLW/DEHO*DO 8QLW6L]H1RWH
'DWH
&RQVXPHG
5HFHLYHG
5HWXUQHG &XP&RQVXPHG
&XP5HFHLYHG
&XP5HWXUQHG
&XP2Q/RF
1RWH
6XSSO\,WHP'HVFULSWLRQ0XG3ODQW%RLOHUV 8QLW/DEHO*DO 8QLW6L]H 1RWH
'DWH
&RQVXPHG
5HFHLYHG
5HWXUQHG &XP&RQVXPHG
&XP5HFHLYHG
&XP5HWXUQHG
&XP2Q/RF
1RWH
6XSSO\,WHP'HVFULSWLRQ5LJ)XHO 8QLW/DEHOJDOXV 8QLW6L]H1RWH
'DWH
&RQVXPHG
5HFHLYHG
5HWXUQHG &XP&RQVXPHG
&XP5HFHLYHG
&XP5HWXUQHG
&XP2Q/RF
1RWH
6XSSO\,WHP'HVFULSWLRQ5LJ:DWHU 8QLW/DEHOEEO 8QLW6L]H1RWH
'DWH
&RQVXPHG
5HFHLYHG
5HWXUQHG &XP&RQVXPHG
&XP5HFHLYHG
&XP5HWXUQHG
&XP2Q/RF
1RWH
6XSSO\,WHP'HVFULSWLRQ:,)%RLOHUV 8QLW/DEHO*DO 8QLW6L]H 1RWH
'DWH
&RQVXPHG
5HFHLYHG
5HWXUQHG &XP&RQVXPHG
&XP5HFHLYHG
&XP5HWXUQHG
&XP2Q/RF
1RWH
/DVW$XWKRULW\9LVLW
'DWH 7RWLQVS1EU 7RWDO,1&QXPEHU &RPPHQW
6723&DUGV6XEPLWWHG
&RPSDQ\ 5SWV &RP
'R\RQ'ULOOLQJ,QF 0HQWRULQJ
'R\RQ'ULOOLQJ,QF +D]DUG,'
'R\RQ'ULOOLQJ,QF 2EVHUYDWLRQV
'R\RQ'ULOOLQJ,QF3-60
V
([SUR 2EVHUYDWLRQV
([SUR +D]DUG,'
+DOOLEXUWRQ 2EVHUYDWLRQV
0,6ZDFR +D]DUG,'
0,6ZDFR 2EVHUYDWLRQV
0,6ZDFR 0HQWRULQJ
:RUOH\ 6WRS:RUN
:RUOH\ 2EVHUYDWLRQV
*HQHUDO1RWHV
&RPPHQW
:HOO1DPH63)125
:HOOERUH1DPH63)1
:HOO&RGH
-RE:25.29(5
:&(,/HYHO/(9(/
'DLO\5HSRUW
'DWH
5HSRUW
3DJHRI
:HOO+HDGHU
3HUPLW&RQFHVVLRQ1
$'/
2SHUDWRU
(1,3(752/(80
6XEVLGLDU\
(1,3HWUROHXP&R,QF
,QLWLDO/DKHH&RGH
'(9(/230(17:(//
5RWDU\7DEOH(OHYDWLRQIW
*URXQG/HYHOIW )LUVW)ODQJHIW
5.%%DVH)ODQJHIW
5.%7XELQJ6SRROIW
5LJV
5LJ1DPH
5,*
&RQWUDFWRU
'2<21
5LJ7\SH
/$1'5,*
5LJ1XP
5LJ6WDUW'DWH
5LJ5HOHDVH'DWH
'DLO\,QIRUPDWLRQ
:HDWKHU
&OHDU:&
7HPSHUDWXUH)
:LQG
1(#03+
'D\V/7,GD\V 'D\V5,GD\V 32%
6DIHW\,QFLGHQWV1HDU0LVV
'DWH
&DWHJRU\ 7\SH 6XEW\SH 6HYHULW\ &DXVH /RVWWLPH"
1R
&RPPHQW
=HUR+6(,QFLGHQWV5HYLHZHGWKH&
VZLWKDIRFXVRQ&RQWURO2I:RUN5HYLHZHG(QL*ROGHQ5XOHVZLWKDIRFXVRQ+\GURJHQ6XOILGH
6DIHW\'ULOOV
7\SH 2FFXU /DVW'DWH 1H[W'DWH
'D\V8QWLO1H[W&KHFN
GD\V
$XWKRULW\9LVLW
5LJ,QVSHFWLRQ
6DIHW\0HHWLQJ
6SLOO'ULOO
77+6'ULOO
770DQ'RZQ'ULOO
775LJ(YDF'ULOO
775LJ)LUH'ULOO
&DVLQJVVHDW
&DV7\SH 2'LQ ,'LQ *UDGH 7RSIW.% %RWWRPIW.% 79'%RWIW.% /DQGLQJ'DWH
&21'8&725
&$6,1* /
&$6,1* /
/,1(5
/,1(5 /
/DVW&HPHQWLQJ
&HPHQWLQJ6WDUW'DWH6WULQJ/,1(5IW.%&RPPHQW;OLQHUKDQJHUSDFNHUVHWLQVLGHOLQHU72OLQHU#
EWPRIIORDWVKRH#
6WJ 7RSIW.% 7RS0HDV0HWK %WPIW.% &RP
6/%7HVWOLQHVWRSVL6/%SXPSEEOV0XG3XVKEEOVFHPHQWGURSZLSHUEDOOEEOV
0XG3XVKDQGULJGLVSODFHZEEOVVOLFNZDWHU6WLQJLQWROLQHUSDFNHUDQGVTXHH]HFHPHQWZEEOVRIVOLFN
ZDWHU&,3#KUV
-RE,QIRUPDWLRQ
-RE3KDVH
:25.29(5
3ODQQHG6WDUW'DWH
6WDUW'DWH
(QG'DWH 3'XUDWLRQGD\V
'DLO\6XPPDU\2SHUDWLRQV
K)RUHFDVW
7HVW%23DQGGHFRPSOHWLRQRIZHOODVSHUSURFHGXUH
K6XPPDU\
&RPSOHWHZHOONLOO±1LSSOHGRZQWUHHDQG1LSSOHXS%23(±%HJLQ7HVWLQJ%23(SHU$2*&&6XQGU\
2SHUDWLRQDW
7HVWLQJ%23(
7LPH/RJ
6WDUW
7LPH
(QG
7LPH 'XUKU
&XP'XU
KU3KDVH 2SU $FW 3ODQ 2SHU'HVFU
:2 0 3 &RQWLQXHWRFLUFXODWH33*.&/1D&OEULQHZLWKELRFLGHGRZQWXELQJWDNLQJUHWXUQVIURP$DQQXOXVWRWLJHUWDQNDW
%30,&3DWEHJLQQLQJRIWRXU7%*36,$DQQXOXV36,%DQQXOXV36,)&3 7%*36,$DQQXOXV
36,%DQQXOXV36,7RWDOIOXLGSXPSHG%%/UHFRYHUHG%%/
:2 0 3 6KXWLQZHOODQGPRQLWRUHGZHOOZLWKSUHVVXUHVIDOOLQJWR7%*36,$DQQXOXV36,%DQQXOXV36,
:2 0 3 2SHQ%DQQXOXVDQGEOHGRLOFDSRIIWRWLJHUWDQNZLWKSUHVVXUHVIDOOLQJ7%*36,$DQQXOXV36,
:2 0 3 &RQWLQXHWRPRQLWRUZHOOZLWKERWKWXELQJDQG$DQQXOXVSUHVVXUHJRLQJRQYDFXXP:LWKWXELQJDQG$DQQXOXVSUHVVXUHVRQ
YDFXXPFRQWLQXHWRPRQLWRUIRUDQDGGLWLRQDOKRXUWRYHULI\ZHOOZDVGHDG1RWHDW+56SUHVVXUHZDV7%*36,$
DQQXOXV36,
:2 & 3 5LJGRZQKLJKSUHVVXUHFLUFXODWLQJKRVHVLQVWDOO´&,:W\SH³+´%39LQWXELQJKDQJHUDQGUHPRYHWUHH,QVSHFWODQGLQJ
WKUHDGVLQWRSRIWXELQJKDQJHUWHUPLQDWHFDSLOODU\OLQHDQGFDSVDPHLQVWDOOIDOVHERZOUHPRYDOSODWHDQGLQVWDOO9HWFRWHVW
GDUW,QVWDOOKLJKSUHVVXUHULVHUDQGWLJKWHQ*UD\ORFNKXEFRQQHFWLRQ1RWH$2*&&UHSUHVHQWHQWLYH*X\&RRNZDLYHG
ZLWQHVVRIWHVW#KUV
:2 & 3 ,QVWDOO%23VWDFNRQKLJKSUHVVXUHULVHWRUTXHEROWVWRVSHF,QVWDOOHGWZRVHWVRIFKRNHNLOOYDOYHVWRVWDFNDQGWKHQFRQQHFW
KLJKSUHVVXUHFKRNHOLQHV+RRNXSDFFXPXODWRUOLQHVWR%23DQG+&5YDOYHV,QVWDOOEHOOQLSSOHULVHUIORZOLQHPRXVHKROH
DQGVNLUWLQJRQVWDFN3HUIRUPDFFXPXODWRUIXQFWLRQWHVWRQ%23FRPSRQHQWVEORZGRZQNLOOOLQHVDQGLQVWDOOKROHILOOOLQH
IRUWULSWDQN3XPS%%/6.&/1D&OELRFLGHWUHDWHGEULQHLQWKHDQQXOXV
:2 & 3 58WRWHVWLQJHTXLSPHQWDQGLQVWDOO´WHVWMRLQWZLWKEODQNLQJSOXJSHU9HWFRUHS3XPS%%/6ELRFLGHWUHDWHGEULQHLQ
WKHDQQXOXV
:2 & 3 )OXLGSDFN%23DQGZHOOFRQWUROHTXLSPHQWZLWKZDWHU±SHUIRUPVKHOOWHVWWR36,JRRGWHVW3XPS%%/6
ELRFLGHWUHDWHGEULQHLQWKHDQQXOXV
:2 & 3 7HVW%23WR$2*&&6XQGU\RI36,36,ZLWKWHVWVHTXHQFHRQ$QQXODUFKRNHYDOYHVSULPDU\DQGVHFRQGDU\
NLOOYDOYHVDQGXSSHUWRSGULYH,%23YDOYHIRUPLQV
3XPS%%/6ELRFLGHWUHDWHGEULQHLQWKHDQQXOXV
1RWHKUVORVV %%/67RWDOORVV %%/6.&/1D&OEULQH
*DV5HDGLQJV
$YJ%DFNJURXQG*DV 0D[%DFNJURXQG*DV $YJ&RQQHFWLRQ*DV 0D[&RQQHFWLRQ*DV
$YJ'ULOO*DV 0D['ULOO*DV $YJ7ULS*DV 0D[7ULS*DV
'DLO\0XG9ROXPHV
7DQN$GGLWLRQ/RVV 7\SH 'HV 9ROXPHEEO
7DQN
+ROH
/RVV
&XPXODWLYH0XG9ROXPHV
$FWLYH9ROXPHEEO
+ROH9ROXPHEEO
$GGLWLRQVEEO
&XP$GGLWLRQVEEO
/RVVHVEEO
&XP/RVVHVEEO
:HOO1DPH63)125
:HOOERUH1DPH63)1
:HOO&RGH
-RE:25.29(5
:&(,/HYHO/(9(/
'DLO\5HSRUW
'DWH
5HSRUW
3DJHRI
'DLO\&RQWDFWV
3RVLWLRQ &RQWDFW1DPH &RPSDQ\ 7LWOH (PDLO 2IILFH 0RELOH
(QLUHSUHVHQWDWLYH %UXFH6LPRQVRQ $65&(QHUJ\6HUYLFHV 'ULOOLQJ6XSY VLGGULOOLQJ#HQLFRP
(QLUHSUHVHQWDWLYH 'DYLG6PLWK $65&(QHUJ\6HUYLFHV 'ULOOLQJ6XSYVLGGULOOLQJ#HQLFRP
(QLUHSUHVHQWDWLYH &KDG*XHFR $65&(QHUJ\6HUYLFHV 'ULOOLQJ6XSY VLGGULOOLQJ#HQLFRP
(QLUHSUHVHQWDWLYH :DGH7KRPDV $65&(QHUJ\6HUYLFHV 5LJ&OHUN $.5LJ&OHUNV'R\RQ#HQLFRP
(QLUHSUHVHQWDWLYH 0DUN+XEOHU %HDFRQ +6( PDUNKXEOHU#H[WHUQDOHQLFRP
7RRO3XVK 9LNWRU7RUUHV 'R\RQ'ULOOLQJ 7RRO3XVKHU ULJ#GR\RQGULOOLQJFRP
7RRO3XVK (LQHU)OHDJOH 'R\RQ'ULOOLQJ 7RXU3XVKHU ULJ#GR\RQGULOOLQJFRP
6DIHW\5HSUHVHQWDWLYH +DUROG5LFKDUGVRQ 'R\RQ'ULOOLQJ +6( KULFKDUGVRQ#GR\RQGULOOLQJFRP
6DIHW\5HSUHVHQWDWLYH 'DYH6HQD 'R\RQ'ULOOLQJ +6( GVHQD#GR\RQGULOOLQJFRP
3HUVRQQHO/RJ32%
&RPSDQ\ 6HUY7\SH :RUN+KU 6WDQGE\+KU &RXQW 1RWH
/LWWOH5HG6HUYLFHV 3XPSLQJ
$65&(QHUJ\6HUYLFHV 5LJFOHUN
$65&(QHUJ\6HUYLFHV 62$
$65&(QHUJ\6HUYLFHV /LIW$GYLVRU
%($&21 +6(
&203(7(17,$ )XHOHU
9HWFR :HOOKHDG
7HQDULV 7KUHDG5HS
7$0 3DFNHU5HS
+$//,%85721 0XG/RJJHUV
6&+/80%(5*(5 6/%0,6ZDFR0XG(QJLQHHU
6&+/80%(5*(5 &HPHQW
*%5 &DVLQJ6HUYLFH
$65&(QHUJ\6HUYLFHV &RPSDQ\PDQ
%DNHU+XJKHV &RPSOHWLRQV
6&+/80%(5*(5 6/%0,6ZDFR0XGSODQW
6&+/80%(5*(5 6/%:,)
(;352 :HOO)ORZ
:25/(< 5LJ6XSSRUW
'2<21 2QVKRUH5LJ
%236WDFN &RPSRQHQWV
'HVFULSWLRQ
%236WDFN
6WDUW'DWH
/DVW&HUWLILFDWLRQ'DWH
3UHVVXUH5DWLQJSVL
7\SH 0DNH 0RGHO ,'1RPLQ 35DQJHSVL /DVW&HUW'DWH
$QQXODU +\GULO *.
;9%5
V +\GULO 03/
%OLQG6KHDU5DP +\GULO 03/
[9%5V +\GULO 03/
6ORZ&LUFXODWLRQ5DWHV
3XPS1XPEHU 0DNH0RGHO
6WDUW'DWH (QG'DWH /LQHU6L]HLQ 9ROXPH3HU6WURNH2YHUULGHEEOVWN 0D[3UHVVXUHSVL
'DWH 'HSWKIW.% 6ORZ6SG 6WURNHVVSP 3SVL (II 4)ORZJSP
'DLO\%XON
6XSSO\,WHP'HVFULSWLRQ(TXLSPHQW)XHO 8QLW/DEHO*DO 8QLW6L]H1RWH
'DWH
&RQVXPHG
5HFHLYHG
5HWXUQHG &XP&RQVXPHG
&XP5HFHLYHG
&XP5HWXUQHG
&XP2Q/RF
1RWH
6XSSO\,WHP'HVFULSWLRQ0XG3ODQW%RLOHUV 8QLW/DEHO*DO 8QLW6L]H 1RWH
'DWH
&RQVXPHG
5HFHLYHG
5HWXUQHG &XP&RQVXPHG
&XP5HFHLYHG
&XP5HWXUQHG
&XP2Q/RF
1RWH
6XSSO\,WHP'HVFULSWLRQ5LJ)XHO 8QLW/DEHOJDOXV 8QLW6L]H1RWH
'DWH
&RQVXPHG
5HFHLYHG
5HWXUQHG &XP&RQVXPHG
&XP5HFHLYHG
&XP5HWXUQHG
&XP2Q/RF
1RWH
6XSSO\,WHP'HVFULSWLRQ5LJ:DWHU 8QLW/DEHOEEO 8QLW6L]H1RWH
'DWH
&RQVXPHG
5HFHLYHG
5HWXUQHG &XP&RQVXPHG
&XP5HFHLYHG
&XP5HWXUQHG
&XP2Q/RF
1RWH
6XSSO\,WHP'HVFULSWLRQ:,)%RLOHUV 8QLW/DEHO*DO 8QLW6L]H 1RWH
'DWH
&RQVXPHG
5HFHLYHG
5HWXUQHG &XP&RQVXPHG
&XP5HFHLYHG
&XP5HWXUQHG
&XP2Q/RF
1RWH
/DVW$XWKRULW\9LVLW
'DWH
7RWLQVS1EU 7RWDO,1&QXPEHU &RPPHQW
$2*&&UHSUHVHQWHQWLYH*X\&RRNZDLYHGZLWQHVVRIWHVW#KUV
6723&DUGV6XEPLWWHG
&RPSDQ\ 5SWV &RP
'R\RQ'ULOOLQJ,QF +D]DUG,'
'R\RQ'ULOOLQJ,QF 6WRS:RUN
'R\RQ'ULOOLQJ,QF 3-60
V
'R\RQ'ULOOLQJ,QF2EVHUYDWLRQV
([SUR 6WRS:RUN
([SUR 2EVHUYDWLRQV
+DOOLEXUWRQ 2EVHUYDWLRQV
+DOOLEXUWRQ 6WRS:RUN
0,6ZDFR +D]DUG,'
0,6ZDFR 0HQWRULQJ
0,6ZDFR 2EVHUYDWLRQV
:RUOH\ 2EVHUYDWLRQV
:RUOH\ 6WRS:RUN
*HQHUDO1RWHV
&RPPHQW
:HOO1DPH63)125
:HOOERUH1DPH63)1
:HOO&RGH
-RE:25.29(5
:&(,/HYHO/(9(/
'DLO\5HSRUW
'DWH
5HSRUW
3DJHRI
:HOO+HDGHU
3HUPLW&RQFHVVLRQ1
$'/
2SHUDWRU
(1,3(752/(80
6XEVLGLDU\
(1,3HWUROHXP&R,QF
,QLWLDO/DKHH&RGH
'(9(/230(17:(//
5RWDU\7DEOH(OHYDWLRQIW
*URXQG/HYHOIW )LUVW)ODQJHIW
5.%%DVH)ODQJHIW
5.%7XELQJ6SRROIW
5LJV
5LJ1DPH
5,*
&RQWUDFWRU
'2<21
5LJ7\SH
/$1'5,*
5LJ1XP
5LJ6WDUW'DWH
5LJ5HOHDVH'DWH
'DLO\,QIRUPDWLRQ
:HDWKHU
&OHDU:&
7HPSHUDWXUH)
:LQG
1(#03+
'D\V/7,GD\V 'D\V5,GD\V 32%
6DIHW\,QFLGHQWV1HDU0LVV
'DWH
&DWHJRU\ 7\SH 6XEW\SH 6HYHULW\ &DXVH /RVWWLPH"
1R
&RPPHQW
=HUR+6(,QFLGHQWV5HYLHZHGWKH&
VZLWKDIRFXVRQ&RPSHWHQF\5HYLHZHG(QL*ROGHQ5XOHVZLWKDIRFXVRQ:DVWH0DQDJHPHQW
6DIHW\'ULOOV
7\SH 2FFXU /DVW'DWH 1H[W'DWH
'D\V8QWLO1H[W&KHFN
GD\V
$XWKRULW\9LVLW
%237HVWSUHVVXUH
5LJ,QVSHFWLRQ
6DIHW\0HHWLQJ
6SLOO'ULOO
77%23'ULOO
77+6'ULOO
77.LFN:KLOH7ULSSLQJ
770DQ'RZQ'ULOO
775LJ(YDF'ULOO
775LJ)LUH'ULOO
&DVLQJVVHDW
&DV7\SH 2'LQ ,'LQ *UDGH 7RSIW.% %RWWRPIW.% 79'%RWIW.% /DQGLQJ'DWH
&21'8&725
&$6,1* /
&$6,1* /
/,1(5
/,1(5 /
/DVW&HPHQWLQJ
&HPHQWLQJ6WDUW'DWH6WULQJ/,1(5IW.%&RPPHQW;OLQHUKDQJHUSDFNHUVHWLQVLGHOLQHU72OLQHU#
EWPRIIORDWVKRH#
6WJ 7RSIW.% 7RS0HDV0HWK %WPIW.% &RP
6/%7HVWOLQHVWRSVL6/%SXPSEEOV0XG3XVKEEOVFHPHQWGURSZLSHUEDOOEEOV
0XG3XVKDQGULJGLVSODFHZEEOVVOLFNZDWHU6WLQJLQWROLQHUSDFNHUDQGVTXHH]HFHPHQWZEEOVRIVOLFN
ZDWHU&,3#KUV
-RE,QIRUPDWLRQ
-RE3KDVH
:25.29(5
3ODQQHG6WDUW'DWH
6WDUW'DWH
(QG'DWH 3'XUDWLRQGD\V
'DLO\6XPPDU\2SHUDWLRQV
K)RUHFDVW
3XOO(63FRPSOHWLRQDVSHUSURFHGXUH
K6XPPDU\
&RPSOHWH%23WHVW5LJXSSXOOKDQJHUIUHHFRQWLQXHGSXOOLQJ(63FRPSOHWLRQ
2SHUDWLRQDW
3XOOLQJRXWRIKROH:(63$VV\
7LPH/RJ
6WDUW
7LPH
(QG
7LPH 'XUKU
&XP'XU
KU3KDVH 2SU $FW 3ODQ 2SHU'HVFU
:2 & 3 &RPSOHWH%23WHVWRQ´DQG´SLSHSHU$2*&&6XQGU\36,ORZDQG36,KLJKSHUIRUPDFFXPXODWRUGUDZGRZQ
WHVWVWDUWLQJSUHVVXUH36,DIWHUIXQFWLRQ36,36,UHFRYHU\VHFRQGVIXOOUHFRYHU\VHFRQGVERWWOHV
1DYHUDJH36,&RQWLQXHWRDGG%3+RI33*.&/1D&OEULQHGRZQDQQXOXV
:2 & 3 5HPRYHEODQNLQJSOXJDQGULJGRZQ%23WHVWHTXLSPHQW&RQWLQXHWRDGG%3+RI33*.&/1D&OEULQHGRZQ
DQQXOXV
:2 0 3 ,QVWDOODQWLSROOXWLRQKRVHRQ(63VKHDYHDQGKDQJLQGHUULFN&RQWLQXHGWRDGG%3+RI33*.&/1D&OEULQHGRZQ
DQQXOXV
:2 0 3 5LJXS*%5DQG%DNHU&HQWULOLIWHTXLSPHQWFKDQJHRXWVSRROVLQFDEOHVSRROLQJXQLWDQGSUHSIRUGHFRPSOHWLRQ&RQWLQXHWR
DGG%3+RI33*.&/1D&OEULQHGRZQDQQXOXV
:2 & 3 0DNHXS7EDUDQGUHPRYH³&,:W\SH³+´%39&RQWLQXHWRDGG%3+RI33*.&/1D&OEULQHGRZQDQQXOXV
:2 / 3 &RQGXFW3-600DNHXSODQGLQJMRLQWDQGVFUHZLQWRWRSGULYHEDFNRXWORFNGURZQSLQV$WWHPSWWRSXOOWXELQJKDQJHUIUHH
E\VWDJHGSXOOLQJZHLJKWXSWR.ZLWKKDQJHUQRWSXOOLQJIUHH3XOOHG.RQKDQJHUDQGULJJHGXSVWHDPRQWXELQJKHDG
ERG\WRIUHHKDQJHU&RQWLQXHWRZRUNKDQJHUIURPQHXWUDOWR.KDQJHUXQWLOIUHHSXOOKDQJHUWRULJIORRUZLWKWUDYHOOLQJ
ZHLJKWRI.
:2 / 3 ,QVSHFWWXELQJKDQJHUIRXQGPXOWLSOHKROHVLQ,%7SXSMRLQWEHORZWXELQJKDQJHU5HPRYHGSHQHWUDWRUDQGSUHSHQGRI
(63FDEOHDQGFDSLOODU\OLQHIRUGHFRPSOHWLRQ/D\GRZQWXELQJKDQJHUDQGUHPRYHODQGLQJMRLQW&RQWLQXHWRDGG%3+RI
33*.&/1D&OEULQHGRZQDQQXOXV
:2 / 3 3XOOMRLQWVRI´33)+<'WXELQJI¶W¶LQVSHFWHGHDFKIRUKROHVMRLQWKDGKROHDOVRERWKKDG
VHYHUHSLQGDPDJH38ZW N0DNHXSKLJKSUHVVXUHFLUFXODWLQJKRVH$GG%3+RI33*.&/1D&OEULQHGRZQ
DQQXOXVYLDWULSWDQN
:2 / 3 3XPS%%/RI.&/1D&OEULQHGRZQWKHWXELQJ±UDWHRIESP#36,WRFLUFXODWHDQGIOXVKZLWKDUHWXUQ
UDWHWRWDORI%%/RIPRVWFUXGHWR9DFWUXFN
:2 / 3 322+ZLWK(63FRPSOHWLRQI¶W¶LQVSHFWLQJWRKROHMRLQWIRXQGKROH#¶DOVRREVHUYHGVHYHUHSLQ
GDPDJHRQMRLQWV38ZW N3XPS%3+RI33*.&/1D&OEULQHGRZQDQQXOXVZLWKWULSWDQN
:2 / 3 3XPS%%/RI.&/1D&OEULQHGRZQWKHWXELQJUDWH%30#36,WRFLUFXODWHDQGIOXVKZLWK%%/6SXPS
REVHUYHGUHWXUQVZLWKUHWXUQUDWHWRWDOYROXPHRI%%/6RIPRVWFUXGHWR9DFWUXFN
:2 / 3 322+ZLWK(63DVVHPEO\I¶W¶LQVSHFWLQJWRKROHVDQGREVHUYHGVHYHUHWRVLJKWSLQGDPDJHI¶W¶
38ZW N&RQWLQXHWRDGG%3+RI33*.&/1D&OEULQHGRZQDQQXOXV
1RWHKUVORVV %%/67RWDOORVV %%/6RI.&/1D&OEULQH
*DV5HDGLQJV
$YJ%DFNJURXQG*DV 0D[%DFNJURXQG*DV $YJ&RQQHFWLRQ*DV 0D[&RQQHFWLRQ*DV
$YJ'ULOO*DV 0D['ULOO*DV $YJ7ULS*DV 0D[7ULS*DV
:HOO1DPH63)125
:HOOERUH1DPH63)1
:HOO&RGH
-RE:25.29(5
:&(,/HYHO/(9(/
'DLO\5HSRUW
'DWH
5HSRUW
3DJHRI
'DLO\0XG9ROXPHV
7DQN$GGLWLRQ/RVV 7\SH 'HV 9ROXPHEEO
7DQN
+ROH
/RVV
&XPXODWLYH0XG9ROXPHV
$FWLYH9ROXPHEEO
+ROH9ROXPHEEO
$GGLWLRQVEEO
&XP$GGLWLRQVEEO
/RVVHVEEO
&XP/RVVHVEEO
'DLO\&RQWDFWV
3RVLWLRQ &RQWDFW1DPH &RPSDQ\ 7LWOH (PDLO 2IILFH 0RELOH
(QLUHSUHVHQWDWLYH 6WHYH/DZUHQFH $65&(QHUJ\6HUYLFHV 'ULOOLQJ6XSY VLGGULOOLQJ#HQLFRP
(QLUHSUHVHQWDWLYH 'DYLG6PLWK $65&(QHUJ\6HUYLFHV 'ULOOLQJ6XSYVLGGULOOLQJ#HQLFRP
(QLUHSUHVHQWDWLYH &KDG*XHFR $65&(QHUJ\6HUYLFHV 'ULOOLQJ6XSY VLGGULOOLQJ#HQLFRP
(QLUHSUHVHQWDWLYH :DGH7KRPDV $65&(QHUJ\6HUYLFHV 5LJ&OHUN $.5LJ&OHUNV'R\RQ#HQLFRP
(QLUHSUHVHQWDWLYH 0DUN+XEOHU %HDFRQ +6( PDUNKXEOHU#H[WHUQDOHQLFRP
7RRO3XVK 9LNWRU7RUUHV 'R\RQ'ULOOLQJ 7RRO3XVKHU ULJ#GR\RQGULOOLQJFRP
7RRO3XVK (LQHU)OHDJOH 'R\RQ'ULOOLQJ 7RXU3XVKHU ULJ#GR\RQGULOOLQJFRP
6DIHW\5HSUHVHQWDWLYH +DUROG5LFKDUGVRQ 'R\RQ'ULOOLQJ +6( KULFKDUGVRQ#GR\RQGULOOLQJFRP
6DIHW\5HSUHVHQWDWLYH 'DYH6HQD 'R\RQ'ULOOLQJ +6( GVHQD#GR\RQGULOOLQJFRP
3HUVRQQHO/RJ32%
&RPSDQ\ 6HUY7\SH :RUN+KU 6WDQGE\+KU &RXQW 1RWH
/LWWOH5HG6HUYLFHV 3XPSLQJ
$65&(QHUJ\6HUYLFHV 5LJFOHUN
$65&(QHUJ\6HUYLFHV 62$
$65&(QHUJ\6HUYLFHV /LIW$GYLVRU
%($&21 +6(
&203(7(17,$ )XHOHU
9HWFR :HOOKHDG
7HQDULV 7KUHDG5HS
7$0 3DFNHU5HS
+$//,%85721 0XG/RJJHUV
6&+/80%(5*(5 6/%0,6ZDFR0XG(QJLQHHU
6&+/80%(5*(5 &HPHQW
*%5 &DVLQJ6HUYLFH
$65&(QHUJ\6HUYLFHV &RPSDQ\PDQ
%DNHU+XJKHV &RPSOHWLRQV
6&+/80%(5*(5 6/%0,6ZDFR0XGSODQW
6&+/80%(5*(5 6/%:,)
(;352 :HOO)ORZ
:25/(< 5LJ6XSSRUW
'2<21 2QVKRUH5LJ
%236WDFN &RPSRQHQWV
'HVFULSWLRQ
%236WDFN
6WDUW'DWH
/DVW&HUWLILFDWLRQ'DWH
3UHVVXUH5DWLQJSVL
7\SH 0DNH 0RGHO ,'1RPLQ 35DQJHSVL /DVW&HUW'DWH
$QQXODU +\GULO *.
;9%5
V +\GULO 03/
%OLQG6KHDU5DP +\GULO 03/
[9%5V +\GULO 03/
6ORZ&LUFXODWLRQ5DWHV
3XPS1XPEHU 0DNH0RGHO
6WDUW'DWH (QG'DWH /LQHU6L]HLQ 9ROXPH3HU6WURNH2YHUULGHEEOVWN 0D[3UHVVXUHSVL
'DWH 'HSWKIW.% 6ORZ6SG 6WURNHVVSP 3SVL (II 4)ORZJSP
'DLO\%XON
6XSSO\,WHP'HVFULSWLRQ(TXLSPHQW)XHO 8QLW/DEHO*DO 8QLW6L]H1RWH
'DWH
&RQVXPHG
5HFHLYHG
5HWXUQHG &XP&RQVXPHG
&XP5HFHLYHG
&XP5HWXUQHG
&XP2Q/RF
1RWH
6XSSO\,WHP'HVFULSWLRQ0XG3ODQW%RLOHUV 8QLW/DEHO*DO 8QLW6L]H 1RWH
'DWH
&RQVXPHG
5HFHLYHG
5HWXUQHG &XP&RQVXPHG
&XP5HFHLYHG
&XP5HWXUQHG
&XP2Q/RF
1RWH
6XSSO\,WHP'HVFULSWLRQ5LJ)XHO 8QLW/DEHOJDOXV 8QLW6L]H1RWH
'DWH
&RQVXPHG
5HFHLYHG
5HWXUQHG &XP&RQVXPHG
&XP5HFHLYHG
&XP5HWXUQHG
&XP2Q/RF
1RWH
6XSSO\,WHP'HVFULSWLRQ5LJ:DWHU 8QLW/DEHOEEO 8QLW6L]H1RWH
'DWH
&RQVXPHG
5HFHLYHG
5HWXUQHG &XP&RQVXPHG
&XP5HFHLYHG
&XP5HWXUQHG
&XP2Q/RF
1RWH
6XSSO\,WHP'HVFULSWLRQ:,)%RLOHUV 8QLW/DEHO*DO 8QLW6L]H 1RWH
'DWH
&RQVXPHG
5HFHLYHG
5HWXUQHG &XP&RQVXPHG
&XP5HFHLYHG
&XP5HWXUQHG
&XP2Q/RF
1RWH
/DVW$XWKRULW\9LVLW
'DWH
7RWLQVS1EU 7RWDO,1&QXPEHU &RPPHQW
$2*&&UHSUHVHQWHQWLYH*X\&RRNZDLYHGZLWQHVVRIWHVW#KUV
6723&DUGV6XEPLWWHG
&RPSDQ\ 5SWV &RP
'R\RQ'ULOOLQJ,QF2EVHUYDWLRQV
'R\RQ'ULOOLQJ,QF3-60
V
'R\RQ'ULOOLQJ,QF +D]DUG,'
'R\RQ'ULOOLQJ,QF6WRS:RUN
([SUR 6WRS:RUN
([SUR 2EVHUYDWLRQV
+DOOLEXUWRQ 6WRS:RUN
+DOOLEXUWRQ 2EVHUYDWLRQV
0,6ZDFR +D]DUG,'
0,6ZDFR 6WRS:RUN
0,6ZDFR 2EVHUYDWLRQV
:HOO1DPH63)125
:HOOERUH1DPH63)1
:HOO&RGH
-RE:25.29(5
:&(,/HYHO/(9(/
'DLO\5HSRUW
'DWH
5HSRUW
3DJHRI
6723&DUGV6XEPLWWHG
&RPSDQ\ 5SWV &RP
:RUOH\ 2EVHUYDWLRQV
:RUOH\6WRS:RUN
*HQHUDO1RWHV
&RPPHQW
:HOO1DPH63)125
:HOOERUH1DPH63)1
:HOO&RGH
-RE:25.29(5
:&(,/HYHO/(9(/
'DLO\5HSRUW
'DWH
5HSRUW
3DJHRI
:HOO+HDGHU
3HUPLW&RQFHVVLRQ1
$'/
2SHUDWRU
(1,3(752/(80
6XEVLGLDU\
(1,3HWUROHXP&R,QF
,QLWLDO/DKHH&RGH
'(9(/230(17:(//
5RWDU\7DEOH(OHYDWLRQIW
*URXQG/HYHOIW )LUVW)ODQJHIW
5.%%DVH)ODQJHIW
5.%7XELQJ6SRROIW
5LJV
5LJ1DPH
5,*
&RQWUDFWRU
'2<21
5LJ7\SH
/$1'5,*
5LJ1XP
5LJ6WDUW'DWH
5LJ5HOHDVH'DWH
'DLO\,QIRUPDWLRQ
:HDWKHU
2YHUFDVW:&
7HPSHUDWXUH)
:LQG
6:#03+
'D\V/7,GD\V 'D\V5,GD\V 32%
6DIHW\,QFLGHQWV1HDU0LVV
'DWH
&DWHJRU\ 7\SH 6XEW\SH 6HYHULW\ &DXVH /RVWWLPH"
1R
&RPPHQW
=HUR+6(,QFLGHQWV5HYLHZHGWKH&
VZLWKDIRFXVRQ&RPSODFHQF\5HYLHZHG(QL*ROGHQ5XOHVZLWKDIRFXVRQ)LUH6DIHW\
6DIHW\'ULOOV
7\SH 2FFXU /DVW'DWH 1H[W'DWH
'D\V8QWLO1H[W&KHFN
GD\V
$XWKRULW\9LVLW
%237HVWSUHVVXUH
5LJ,QVSHFWLRQ
6DIHW\0HHWLQJ
6SLOO'ULOO
77%23'ULOO
77+6'ULOO
77.LFN:KLOH7ULSSLQJ
770DQ'RZQ'ULOO
775LJ(YDF'ULOO
775LJ)LUH'ULOO
&DVLQJVVHDW
&DV7\SH 2'LQ ,'LQ *UDGH 7RSIW.% %RWWRPIW.% 79'%RWIW.% /DQGLQJ'DWH
&21'8&725
&$6,1* /
&$6,1* /
/,1(5
/,1(5 /
/DVW&HPHQWLQJ
&HPHQWLQJ6WDUW'DWH6WULQJ/,1(5IW.%&RPPHQW;OLQHUKDQJHUSDFNHUVHWLQVLGHOLQHU72OLQHU#
EWPRIIORDWVKRH#
6WJ 7RSIW.% 7RS0HDV0HWK %WPIW.% &RP
6/%7HVWOLQHVWRSVL6/%SXPSEEOV0XG3XVKEEOVFHPHQWGURSZLSHUEDOOEEOV
0XG3XVKDQGULJGLVSODFHZEEOVVOLFNZDWHU6WLQJLQWROLQHUSDFNHUDQGVTXHH]HFHPHQWZEEOVRIVOLFN
ZDWHU&,3#KUV
-RE,QIRUPDWLRQ
-RE3KDVH
:25.29(5
3ODQQHG6WDUW'DWH
6WDUW'DWH
(QG'DWH 3'XUDWLRQGD\V
'DLO\6XPPDU\2SHUDWLRQV
K)RUHFDVW
5LJGRZQ%DNHU&HQWULOLIW±5XQFOHDQRXWDVVHPEO\SHUSURFHGXUH
K6XPPDU\
3XOO(63FRPSOHWLRQDQG/'SXPSVHDOVPRWRUVKURXGDVVHPEO\SHUSURFHGXUH
2SHUDWLRQDW
08&OHDQ2XW%+$
7LPH/RJ
6WDUW
7LPH
(QG
7LPH 'XUKU
&XP'XU
KU3KDVH 2SU $FW 3ODQ 2SHU'HVFU
:2 / 3 &RQWLQXHWRSXOORXWRIKROHZLWK(63FRPSOHWLRQOD\LQJGRZQò´WXELQJI¶W¶8: .$GGLQJ%3+RI
33*.&/1D&OWUHDWHGZLWKELRFLGHEULQHGRZQDQQXOXV
:2 / 3 &KDQJHRXW(63FDEOHVSRROLQVSRROLQJXQLW&RQWLQXHWRDGG%3+RI33*.&/1D&OEULQHWUHDWHGZLWKELRFLGH
GRZQDQQXOXV
:2 / 3 &RQWLQXHWRSXOORXWRIKROHZLWK(63FRPSOHWLRQOD\LQJGRZQò´WXELQJI¶W¶8: .&RQWLQXHWRDGG
%3+RI33*.&/1D&OEULQHELRFLGHWUHDWHGGRZQDQQXOXV
:2 / 3 5LJXSKLJKSUHVVXUHFLUFXODWLQJKRVHSXPSRI33*.&/1D&OEULQH%%/33*.&/1D&OFLWULFSLOO
DOOWUHDWHGELRFLGHWRFOHDQ,'RISLSHDW%30#36,$W%%/¶VDZD\KDGUHWXUQVYHU\GLUW\GLYHUWHGWRFXWWLQJV
WDQN
:2 / 3 &RQWLQXHWRSXOORXWRIKROHZLWK(63FRPSOHWLRQOD\LQJGRZQò´WXELQJI¶W¶8: .
:2 / 76 *%5SRZHUSDFNWKURWWOHFRQWUROORVWUHVSRQVHDQGXQLWZDVFKDQJHGRXWZLWKEDFNXSDQGRSHUDWLRQVUHVXPHG$GGHG
%3+RI33*ELRFLGHWUHDWHGEULQH
:2 / 3 &RQWLQXHWRSXOORXWRIKROHZLWK(63FRPSOHWLRQOD\LQJGRZQò´WXELQJI¶W¶8: .$GG%3+RI
33*.&/1D&OEULQHZLWKELRFLGHGRZQDQQXOXV
:2 / 3 5LJXSKLJKSUHVVXUHFLUFXODWLQJKRVHDQGSXPSRI33*.&/1D&OEULQH%%/33*FLWULFSLOOELRFLGH
WUHDWHGWRFOHDQ,'RISLSHDW%30#36,$W%%/¶VDZD\KDGUHWXUQVYHU\GLUW\GLYHUWHGWRFXWWLQJVWDQN
1RWH3HUIRUPHGZRUNVKRSRQWKHLPSRUWDQFHRI+D]DUG5HSRUWLQJLQ:HOO2SHUDWLRQV
:2 / 3 &RQWLQXHWRSXOORXWRIKROHZLWK(63FRPSOHWLRQOD\LQJGRZQò´WXELQJI¶W¶8: N&RQWLQXHWRDGG
%3+RI33*.&/1D&OEULQHELRFLGHWUHDWHGGRZQDQQXOXV
:2 / 3 3XOORXWRIKROHZLWK(63FRPSOHWLRQOD\LQJGRZQò´WXELQJI¶W¶8: .&RQWLQXHWRDGG%3+RI
33*.&/1D&OEULQHELRFLGHWUHDWHGGRZQDQQXOXV
:2 / 3 3-60±/'(63SXPSVHDOVPRWRUVKURXGDVVHPEO\I¶WVXUIDFH6HFXUHG(63FDEOHDQG&DSOLQH&KHFNURWDWLRQDOO
FRPSRQHQWVJRRGDQGRLOZDVWUDQVSDUHQW0DLQWDLQLQJ%3+33*.&/1D&OWUHDWHGZLWKELRFLGHGRZQDQQXOXV
1RWHKUVORVV %%/67RWDOORVV %%/6RI.&/1D&OEULQH
*DV5HDGLQJV
$YJ%DFNJURXQG*DV 0D[%DFNJURXQG*DV $YJ&RQQHFWLRQ*DV 0D[&RQQHFWLRQ*DV
$YJ'ULOO*DV 0D['ULOO*DV $YJ7ULS*DV 0D[7ULS*DV
'DLO\0XG9ROXPHV
7DQN$GGLWLRQ/RVV 7\SH 'HV 9ROXPHEEO
7DQN
+ROH
:HOO1DPH63)125
:HOOERUH1DPH63)1
:HOO&RGH
-RE:25.29(5
:&(,/HYHO/(9(/
'DLO\5HSRUW
'DWH
5HSRUW
3DJHRI
'DLO\0XG9ROXPHV
7DQN$GGLWLRQ/RVV 7\SH 'HV 9ROXPHEEO
/RVV
&XPXODWLYH0XG9ROXPHV
$FWLYH9ROXPHEEO
+ROH9ROXPHEEO
$GGLWLRQVEEO
&XP$GGLWLRQVEEO
/RVVHVEEO
&XP/RVVHVEEO
'DLO\&RQWDFWV
3RVLWLRQ &RQWDFW1DPH &RPSDQ\ 7LWOH (PDLO 2IILFH 0RELOH
(QLUHSUHVHQWDWLYH 6WHYH/DZUHQFH $65&(QHUJ\6HUYLFHV 'ULOOLQJ6XSY VLGGULOOLQJ#HQLFRP
(QLUHSUHVHQWDWLYH 'DYLG6PLWK $65&(QHUJ\6HUYLFHV 'ULOOLQJ6XSYVLGGULOOLQJ#HQLFRP
(QLUHSUHVHQWDWLYH :DGH7KRPDV $65&(QHUJ\6HUYLFHV 5LJ&OHUN $.5LJ&OHUNV'R\RQ#HQLFRP
(QLUHSUHVHQWDWLYH 0DUN+XEOHU %HDFRQ +6( PDUNKXEOHU#H[WHUQDOHQLFRP
7RRO3XVK 9LNWRU7RUUHV 'R\RQ'ULOOLQJ 7RRO3XVKHU ULJ#GR\RQGULOOLQJFRP
7RRO3XVK (LQHU)OHDJOH 'R\RQ'ULOOLQJ 7RXU3XVKHU ULJ#GR\RQGULOOLQJFRP
6DIHW\5HSUHVHQWDWLYH +DUROG5LFKDUGVRQ 'R\RQ'ULOOLQJ +6( KULFKDUGVRQ#GR\RQGULOOLQJFRP
6DIHW\5HSUHVHQWDWLYH 'DYH6HQD 'R\RQ'ULOOLQJ +6( GVHQD#GR\RQGULOOLQJFRP
3HUVRQQHO/RJ32%
&RPSDQ\ 6HUY7\SH :RUN+KU 6WDQGE\+KU &RXQW 1RWH
/LWWOH5HG6HUYLFHV 3XPSLQJ
$65&(QHUJ\6HUYLFHV 5LJFOHUN
$65&(QHUJ\6HUYLFHV 62$
$65&(QHUJ\6HUYLFHV /LIW$GYLVRU
%($&21 +6(
&203(7(17,$ )XHOHU
9HWFR :HOOKHDG
7HQDULV 7KUHDG5HS
7$0 3DFNHU5HS
$65&(QHUJ\6HUYLFHV &RPSDQ\PDQ
+$//,%85721 0XG/RJJHUV
6&+/80%(5*(5 6/%0,6ZDFR0XG(QJLQHHU
6&+/80%(5*(5 &HPHQW
*%5 &DVLQJ6HUYLFH
%DNHU+XJKHV &RPSOHWLRQV
6&+/80%(5*(5 6/%0,6ZDFR0XGSODQW
6&+/80%(5*(5 6/%:,)
(;352 :HOO)ORZ
:25/(< 5LJ6XSSRUW
'2<21 2QVKRUH5LJ
%236WDFN &RPSRQHQWV
'HVFULSWLRQ
%236WDFN
6WDUW'DWH
/DVW&HUWLILFDWLRQ'DWH
3UHVVXUH5DWLQJSVL
7\SH 0DNH 0RGHO ,'1RPLQ 35DQJHSVL /DVW&HUW'DWH
$QQXODU +\GULO *.
;9%5
V +\GULO 03/
%OLQG6KHDU5DP +\GULO 03/
[9%5V +\GULO 03/
6ORZ&LUFXODWLRQ5DWHV
3XPS1XPEHU 0DNH0RGHO
6WDUW'DWH (QG'DWH /LQHU6L]HLQ 9ROXPH3HU6WURNH2YHUULGHEEOVWN 0D[3UHVVXUHSVL
'DWH 'HSWKIW.% 6ORZ6SG 6WURNHVVSP 3SVL (II 4)ORZJSP
'DLO\%XON
6XSSO\,WHP'HVFULSWLRQ(TXLSPHQW)XHO 8QLW/DEHO*DO 8QLW6L]H1RWH
'DWH
&RQVXPHG
5HFHLYHG
5HWXUQHG &XP&RQVXPHG
&XP5HFHLYHG
&XP5HWXUQHG
&XP2Q/RF
1RWH
6XSSO\,WHP'HVFULSWLRQ0XG3ODQW%RLOHUV 8QLW/DEHO*DO 8QLW6L]H 1RWH
'DWH
&RQVXPHG
5HFHLYHG
5HWXUQHG &XP&RQVXPHG
&XP5HFHLYHG
&XP5HWXUQHG
&XP2Q/RF
1RWH
6XSSO\,WHP'HVFULSWLRQ5LJ)XHO 8QLW/DEHOJDOXV 8QLW6L]H1RWH
'DWH
&RQVXPHG
5HFHLYHG
5HWXUQHG &XP&RQVXPHG
&XP5HFHLYHG
&XP5HWXUQHG
&XP2Q/RF
1RWH
6XSSO\,WHP'HVFULSWLRQ5LJ:DWHU 8QLW/DEHOEEO 8QLW6L]H1RWH
'DWH
&RQVXPHG
5HFHLYHG
5HWXUQHG &XP&RQVXPHG
&XP5HFHLYHG
&XP5HWXUQHG
&XP2Q/RF
1RWH
6XSSO\,WHP'HVFULSWLRQ:,)%RLOHUV 8QLW/DEHO*DO 8QLW6L]H 1RWH
'DWH
&RQVXPHG
5HFHLYHG
5HWXUQHG &XP&RQVXPHG
&XP5HFHLYHG
&XP5HWXUQHG
&XP2Q/RF
1RWH
/DVW$XWKRULW\9LVLW
'DWH
7RWLQVS1EU 7RWDO,1&QXPEHU &RPPHQW
$2*&&UHSUHVHQWHQWLYH*X\&RRNZDLYHGZLWQHVVRIWHVW#KUV
6723&DUGV6XEPLWWHG
&RPSDQ\ 5SWV &RP
'R\RQ'ULOOLQJ,QF6WRS:RUN
'R\RQ'ULOOLQJ,QF +D]DUG,'
'R\RQ'ULOOLQJ,QF2EVHUYDWLRQV
'R\RQ'ULOOLQJ,QF3-60
V
(QL +D]DUG,'
([SUR 6WRS:RUN
([SUR 2EVHUYDWLRQV
*%5 6WRS:RUN
+DOOLEXUWRQ 2EVHUYDWLRQV
+DOOLEXUWRQ 6WRS:RUN
0,6ZDFR 2EVHUYDWLRQV
0,6ZDFR 6WRS:RUN
0,6ZDFR +D]DUG,'
:RUOH\ +D]DUG,'
:HOO1DPH63)125
:HOOERUH1DPH63)1
:HOO&RGH
-RE:25.29(5
:&(,/HYHO/(9(/
'DLO\5HSRUW
'DWH
5HSRUW
3DJHRI
6723&DUGV6XEPLWWHG
&RPSDQ\ 5SWV &RP
:RUOH\ 6WRS:RUN
:RUOH\ 2EVHUYDWLRQV
*HQHUDO1RWHV
&RPPHQW
:HOO1DPH63)125
:HOOERUH1DPH63)1
:HOO&RGH
-RE:25.29(5
:&(,/HYHO/(9(/
'DLO\5HSRUW
'DWH
5HSRUW
3DJHRI
:HOO+HDGHU
3HUPLW&RQFHVVLRQ1
$'/
2SHUDWRU
(1,3(752/(80
6XEVLGLDU\
(1,3HWUROHXP&R,QF
,QLWLDO/DKHH&RGH
'(9(/230(17:(//
5RWDU\7DEOH(OHYDWLRQIW
*URXQG/HYHOIW )LUVW)ODQJHIW
5.%%DVH)ODQJHIW
5.%7XELQJ6SRROIW
5LJV
5LJ1DPH
5,*
&RQWUDFWRU
'2<21
5LJ7\SH
/$1'5,*
5LJ1XP
5LJ6WDUW'DWH
5LJ5HOHDVH'DWH
'DLO\,QIRUPDWLRQ
:HDWKHU
2YHUFDVW:&
7HPSHUDWXUH)
:LQG
6:#03+
'D\V/7,GD\V 'D\V5,GD\V 32%
6DIHW\,QFLGHQWV1HDU0LVV
'DWH
&DWHJRU\ 7\SH 6XEW\SH 6HYHULW\ &DXVH /RVWWLPH"
1R
&RPPHQW
=HUR+6(,QFLGHQWV5HYLHZHGWKH&
VZLWKDIRFXVRQ&RPPLWPHQWWR6DIHW\5HYLHZHG(QL*ROGHQ5XOHVZLWKDIRFXVRQ(QHUJL]HG6\VWHPV
6DIHW\'ULOOV
7\SH 2FFXU /DVW'DWH 1H[W'DWH
'D\V8QWLO1H[W&KHFN
GD\V
$XWKRULW\9LVLW
%23'ULOO
%237HVWSUHVVXUH
5LJ,QVSHFWLRQ
6DIHW\0HHWLQJ
6SLOO'ULOO
77%23'ULOO
77&DPS)LUH'ULOO
77+6'ULOO
77.LFN:KLOH7ULSSLQJ
770DQ'RZQ'ULOO
775LJ(YDF'ULOO
775LJ)LUH'ULOO
&DVLQJVVHDW
&DV7\SH 2'LQ ,'LQ *UDGH 7RSIW.% %RWWRPIW.% 79'%RWIW.% /DQGLQJ'DWH
&21'8&725
&$6,1* /
&$6,1* /
/,1(5
/,1(5 /
/DVW&HPHQWLQJ
&HPHQWLQJ6WDUW'DWH6WULQJ/,1(5IW.%&RPPHQW;OLQHUKDQJHUSDFNHUVHWLQVLGHOLQHU72OLQHU#
EWPRIIORDWVKRH#
6WJ 7RSIW.% 7RS0HDV0HWK %WPIW.% &RP
6/%7HVWOLQHVWRSVL6/%SXPSEEOV0XG3XVKEEOVFHPHQWGURSZLSHUEDOOEEOV
0XG3XVKDQGULJGLVSODFHZEEOVVOLFNZDWHU6WLQJLQWROLQHUSDFNHUDQGVTXHH]HFHPHQWZEEOVRIVOLFN
ZDWHU&,3#KUV
-RE,QIRUPDWLRQ
-RE3KDVH
:25.29(5
3ODQQHG6WDUW'DWH
6WDUW'DWH
(QG'DWH 3'XUDWLRQGD\V
'DLO\6XPPDU\2SHUDWLRQV
K)RUHFDVW
3HUIRUPFOHDQRXWUXQVIRUOLQHUDQGFDVLQJ3UHSWRUXQWHVWSDFNHUDVVHPEO\SHUSURFHGXUH
K6XPPDU\
5LJGRZQ%DNHU&HQWULOLIW±5,+´FOHDQRXWDVVHPEO\SHUSURFHGXUH
2SHUDWLRQDW
3XOORXWRIKROH:&OHDQ2XW$66<
7LPH/RJ
6WDUW
7LPH
(QG
7LPH 'XUKU
&XP'XU
KU3KDVH 2SU $FW 3ODQ 2SHU'HVFU
:2 / 3 5LJGRZQ%DNHU&HQWULOLIWHTXLSPHQWIURPULJIORRUSXOOEDFN(63FDEOHDQG&DSLOODU\OLQHIURPVKHDYHVWRVSRROLQJXQLW&OHDU
DQGFOHDQULJIORRUIURPSXOOLQJ(63FRPSOHWLRQ0RELOL]H´KDQGOLQJHTXLSPHQWIRUQH[WUXQ&RQWLQXHWRDGG%3+RI
33*.&/1D&OWUHDWHGZLWKELRFLGHEULQHGRZQDQQXOXV
:2 / 3 5HPRYHDQWLSROOXWLRQKRVHIURP(63FDEOHVKHDYHVLQGHUULFNDQGVWRUHLQER[FRQWLQXHWRFOHDQULJIORRUDQGRUJDQL]H
$GGLQJ33*.&/1D&OELRFLGHWUHDWHGEULQHGRZQDQQXOXV
:2 & 3 ,QVWDOOZHDUEXVKLQJSHU9HWFRUHS$GG33*.&/1D&OELRFLGHWUHDWHGEULQHGRZQDQQXOXV
:2 0 3 3-606WUDSDQGPDNHXSFOHDQRXW%+$DVVHPEO\3LFNXSVLQJOHRI´3+SLSHWR¶WRUTXHWRVSHFZLWK*%5
WRQJV&RQWLQXHWRDGG%3+RI33*.&/1D&OEULQHWUHDWHGZLWKELRFLGHGRZQDQQXOXV
:2 0 3 &RQWLQXHWRVLQJOHLQKROHZLWKFOHDQRXWDVVHPEO\SLFNLQJXS´'HOWD'3IURP¶WR¶8: .': .
$GGLQJ%3+RI33*.&/1D&OEULQHWUHDWHGZLWKELRFLGHGRZQDQQXOXV
:2 0 75 'UDZZRUNVKLJKWHPSHUDWXUHDODUPVRXQGHGLQVSHFWHGDQGIRXQGGUDZZRUNVEUHDNZDWHUFRROLQJKDGIUR]HQLQVWDOOKHDWRQ
VDPHDQGWKDZHG
:2 0 3 &RQWLQXHWRVLQJOHLQKROHZLWKFOHDQRXWDVVHPEO\SLFNLQJXS´'HOWD'3IURP¶WR¶8: .':
.&RQWLQXHWRDGG%3+RI33*.&/1D&OEULQHWUHDWHGZLWKELRFLGHGRZQDQQXOXV
:2 0 3 6ZLWFKKDQGOLQJHTXLSPHQWWRVLQJOHLQKROHZLWKFOHDQRXWDVVHPEO\SLFNLQJXS´77'3IURP¶WR¶
(VWDEOLVKSDUDPHWHUV%30#36,DQG%30#36,DQG530#NWRUTXH8: .': .
57: .&RQWLQXHWRDGG%3+RI33*.&/1D&OEULQHWUHDWHGZLWKELRFLGHGRZQDQQXOXV
1RWHKUVORVV %%/67RWDOORVV %%/6RI.&/1D&OEULQH
*DV5HDGLQJV
$YJ%DFNJURXQG*DV 0D[%DFNJURXQG*DV $YJ&RQQHFWLRQ*DV 0D[&RQQHFWLRQ*DV
$YJ'ULOO*DV 0D['ULOO*DV $YJ7ULS*DV 0D[7ULS*DV
'DLO\0XG9ROXPHV
7DQN$GGLWLRQ/RVV 7\SH 'HV 9ROXPHEEO
7DQN
+ROH
/RVV
&XPXODWLYH0XG9ROXPHV
$FWLYH9ROXPHEEO
+ROH9ROXPHEEO
$GGLWLRQVEEO
&XP$GGLWLRQVEEO
/RVVHVEEO
&XP/RVVHVEEO
:HOO1DPH63)125
:HOOERUH1DPH63)1
:HOO&RGH
-RE:25.29(5
:&(,/HYHO/(9(/
'DLO\5HSRUW
'DWH
5HSRUW
3DJHRI
'DLO\&RQWDFWV
3RVLWLRQ &RQWDFW1DPH &RPSDQ\ 7LWOH (PDLO 2IILFH 0RELOH
(QLUHSUHVHQWDWLYH 6WHYH/DZUHQFH $65&(QHUJ\6HUYLFHV 'ULOOLQJ6XSY VLGGULOOLQJ#HQLFRP
(QLUHSUHVHQWDWLYH 'DYLG6PLWK $65&(QHUJ\6HUYLFHV 'ULOOLQJ6XSYVLGGULOOLQJ#HQLFRP
(QLUHSUHVHQWDWLYH :DGH7KRPDV $65&(QHUJ\6HUYLFHV 5LJ&OHUN $.5LJ&OHUNV'R\RQ#HQLFRP
(QLUHSUHVHQWDWLYH 0DUN+XEOHU %HDFRQ +6( PDUNKXEOHU#H[WHUQDOHQLFRP
7RRO3XVK 9LNWRU7RUUHV 'R\RQ'ULOOLQJ 7RRO3XVKHU ULJ#GR\RQGULOOLQJFRP
7RRO3XVK (LQHU)OHDJOH 'R\RQ'ULOOLQJ 7RXU3XVKHU ULJ#GR\RQGULOOLQJFRP
6DIHW\5HSUHVHQWDWLYH +DUROG5LFKDUGVRQ 'R\RQ'ULOOLQJ +6( KULFKDUGVRQ#GR\RQGULOOLQJFRP
6DIHW\5HSUHVHQWDWLYH 'DYH6HQD 'R\RQ'ULOOLQJ +6( GVHQD#GR\RQGULOOLQJFRP
3HUVRQQHO/RJ32%
&RPSDQ\ 6HUY7\SH :RUN+KU 6WDQGE\+KU &RXQW 1RWH
/LWWOH5HG6HUYLFHV 3XPSLQJ
$65&(QHUJ\6HUYLFHV 5LJFOHUN
$65&(QHUJ\6HUYLFHV 62$
$65&(QHUJ\6HUYLFHV /LIW$GYLVRU
%($&21 +6(
&203(7(17,$ )XHOHU
9HWFR :HOOKHDG
7HQDULV 7KUHDG5HS
7$0 3DFNHU5HS
$65&(QHUJ\6HUYLFHV &RPSDQ\PDQ
+$//,%85721 0XG/RJJHUV
6&+/80%(5*(5 6/%0,6ZDFR0XG(QJLQHHU
6&+/80%(5*(5 &HPHQW
*%5 &DVLQJ6HUYLFH
%DNHU+XJKHV &RPSOHWLRQV
6&+/80%(5*(5 6/%0,6ZDFR0XGSODQW
6&+/80%(5*(5 6/%:,)
(;352 :HOO)ORZ
:25/(< 5LJ6XSSRUW
'2<21 2QVKRUH5LJ
%236WDFN &RPSRQHQWV
'HVFULSWLRQ
%236WDFN
6WDUW'DWH
/DVW&HUWLILFDWLRQ'DWH
3UHVVXUH5DWLQJSVL
7\SH 0DNH 0RGHO ,'1RPLQ 35DQJHSVL /DVW&HUW'DWH
$QQXODU +\GULO *.
;9%5
V +\GULO 03/
%OLQG6KHDU5DP +\GULO 03/
[9%5V +\GULO 03/
6ORZ&LUFXODWLRQ5DWHV
3XPS1XPEHU 0DNH0RGHO
6WDUW'DWH (QG'DWH /LQHU6L]HLQ 9ROXPH3HU6WURNH2YHUULGHEEOVWN 0D[3UHVVXUHSVL
'DWH 'HSWKIW.% 6ORZ6SG 6WURNHVVSP 3SVL (II 4)ORZJSP
'DLO\%XON
6XSSO\,WHP'HVFULSWLRQ(TXLSPHQW)XHO 8QLW/DEHO*DO 8QLW6L]H1RWH
'DWH
&RQVXPHG
5HFHLYHG
5HWXUQHG &XP&RQVXPHG
&XP5HFHLYHG
&XP5HWXUQHG
&XP2Q/RF
1RWH
6XSSO\,WHP'HVFULSWLRQ0XG3ODQW%RLOHUV 8QLW/DEHO*DO 8QLW6L]H 1RWH
'DWH
&RQVXPHG
5HFHLYHG
5HWXUQHG &XP&RQVXPHG
&XP5HFHLYHG
&XP5HWXUQHG
&XP2Q/RF
1RWH
6XSSO\,WHP'HVFULSWLRQ5LJ)XHO 8QLW/DEHOJDOXV 8QLW6L]H1RWH
'DWH
&RQVXPHG
5HFHLYHG
5HWXUQHG &XP&RQVXPHG
&XP5HFHLYHG
&XP5HWXUQHG
&XP2Q/RF
1RWH
6XSSO\,WHP'HVFULSWLRQ5LJ:DWHU 8QLW/DEHOEEO 8QLW6L]H1RWH
'DWH
&RQVXPHG
5HFHLYHG
5HWXUQHG &XP&RQVXPHG
&XP5HFHLYHG
&XP5HWXUQHG
&XP2Q/RF
1RWH
6XSSO\,WHP'HVFULSWLRQ:,)%RLOHUV 8QLW/DEHO*DO 8QLW6L]H 1RWH
'DWH
&RQVXPHG
5HFHLYHG
5HWXUQHG &XP&RQVXPHG
&XP5HFHLYHG
&XP5HWXUQHG
&XP2Q/RF
1RWH
/DVW$XWKRULW\9LVLW
'DWH
7RWLQVS1EU 7RWDO,1&QXPEHU &RPPHQW
$2*&&UHSUHVHQWHQWLYH*X\&RRNZDLYHGZLWQHVVRIWHVW#KUV
6723&DUGV6XEPLWWHG
&RPSDQ\ 5SWV &RP
'R\RQ'ULOOLQJ,QF 2EVHUYDWLRQV
'R\RQ'ULOOLQJ,QF6WRS:RUN
'R\RQ'ULOOLQJ,QF3-60
V
'R\RQ'ULOOLQJ,QF +D]DUG,'
(QL +D]DUG,'
([SUR 6WRS:RUN
([SUR 2EVHUYDWLRQV
*%5 6WRS:RUN
+DOOLEXUWRQ 2EVHUYDWLRQV
+DOOLEXUWRQ 6WRS:RUN
0,6ZDFR 6WRS:RUN
0,6ZDFR +D]DUG,'
0,6ZDFR 2EVHUYDWLRQV
:RUOH\ 6WRS:RUN
:RUOH\ 2EVHUYDWLRQV
:RUOH\+D]DUG,'
*HQHUDO1RWHV
&RPPHQW
:HOO1DPH63)125
:HOOERUH1DPH63)1
:HOO&RGH
-RE:25.29(5
:&(,/HYHO/(9(/
'DLO\5HSRUW
'DWH
5HSRUW
3DJHRI
:HOO+HDGHU
3HUPLW&RQFHVVLRQ1
$'/
2SHUDWRU
(1,3(752/(80
6XEVLGLDU\
(1,3HWUROHXP&R,QF
,QLWLDO/DKHH&RGH
'(9(/230(17:(//
5RWDU\7DEOH(OHYDWLRQIW
*URXQG/HYHOIW )LUVW)ODQJHIW
5.%%DVH)ODQJHIW
5.%7XELQJ6SRROIW
5LJV
5LJ1DPH
5,*
&RQWUDFWRU
'2<21
5LJ7\SH
/$1'5,*
5LJ1XP
5LJ6WDUW'DWH
5LJ5HOHDVH'DWH
'DLO\,QIRUPDWLRQ
:HDWKHU
&OHDU:&
7HPSHUDWXUH)
:LQG
1(#03+
'D\V/7,GD\V 'D\V5,GD\V 32%
6DIHW\,QFLGHQWV1HDU0LVV
'DWH
&DWHJRU\ 7\SH 6XEW\SH 6HYHULW\ &DXVH /RVWWLPH"
1R
&RPPHQW
=HUR+6(,QFLGHQWV5HYLHZHGWKH&
VZLWKDIRFXVRQ6DIHW\&XOWXUH5HYLHZHG(QL*ROGHQ5XOHVZLWKDIRFXVRQ3HUPLW7R:RUN
6DIHW\'ULOOV
7\SH 2FFXU /DVW'DWH 1H[W'DWH
'D\V8QWLO1H[W&KHFN
GD\V
$XWKRULW\9LVLW
%23'ULOO
%237HVWSUHVVXUH
5LJ,QVSHFWLRQ
6DIHW\0HHWLQJ
6SLOO'ULOO
77%23'ULOO
77&DPS)LUH'ULOO
77+6'ULOO
77.LFN:KLOH7ULSSLQJ
770DQ'RZQ'ULOO
775LJ(YDF'ULOO
775LJ)LUH'ULOO
&DVLQJVVHDW
&DV7\SH 2'LQ ,'LQ *UDGH 7RSIW.% %RWWRPIW.% 79'%RWIW.% /DQGLQJ'DWH
&21'8&725
&$6,1* /
&$6,1* /
/,1(5
/,1(5 /
/DVW&HPHQWLQJ
&HPHQWLQJ6WDUW'DWH6WULQJ/,1(5IW.%&RPPHQW;OLQHUKDQJHUSDFNHUVHWLQVLGHOLQHU72OLQHU#
EWPRIIORDWVKRH#
6WJ 7RSIW.% 7RS0HDV0HWK %WPIW.% &RP
6/%7HVWOLQHVWRSVL6/%SXPSEEOV0XG3XVKEEOVFHPHQWGURSZLSHUEDOOEEOV
0XG3XVKDQGULJGLVSODFHZEEOVVOLFNZDWHU6WLQJLQWROLQHUSDFNHUDQGVTXHH]HFHPHQWZEEOVRIVOLFN
ZDWHU&,3#KUV
-RE,QIRUPDWLRQ
-RE3KDVH
:25.29(5
3ODQQHG6WDUW'DWH
6WDUW'DWH
(QG'DWH 3'XUDWLRQGD\V
'DLO\6XPPDU\2SHUDWLRQV
K)RUHFDVW
322+±/'´FOHDQRXWDVVHPEO\5XQ7DPSDFNHUDQGWHVWFDVLQJSHUSURFHGXUH
K6XPPDU\
5XQ´DQG´FOHDQRXWDVVHPEOLHVSHUSURFHGXUH
2SHUDWLRQDW
5XQLQKROH:7$03DFNHU
7LPH/RJ
6WDUW
7LPH
(QG
7LPH 'XUKU
&XP'XU
KU3KDVH 2SU $FW 3ODQ 2SHU'HVFU
:2 0 3 3-60±3LFNLQJXS´77'3ZLWK´FOHDQRXWDVVHPEO\IURP¶WR¶8: .': .57:
.(QWHUHGOLQHUWRSDW¶FRQWLQXHGLQWROLQHUWR¶¶ZLWKRXWVHHLQJDQ\VHWGRZQZHLJKW$GG%3+RI
33*.&/1D&OEULQHWUHDWHGZLWKELRFLGHGRZQDQQXOXV
:2 0 3 &LUFXODWHDQGSXPSWKH%%/GULOOSLSHYROXPHZLWKUDWH%30#36,2EVHUYHGUHWXUQVDIWHU%%/6SXPSHG
UHFRYHU\IORZUDWHRI8: .': .
:2 0 3 3-60±0RQLWRUZHOOIRUPLQXWHVVWDWLFORVVHV322+ZLWK´FOHDQRXWDVVHPEO\IURP¶WR¶ULJJHGXS
*%5DQGOD\GRZQ%+$´3+$GGLQJ%3+RI33*.&/1D&OELRFLGHWUHDWHGEULQHSOXVSLSH
GLVSODFHPHQWGRZQDQQXOXV
:2 0 3 3-60&OHDQDQGFOHDUULJIORRURI´KDQGOLQJHTXLSPHQWDQGPRELOL]H´FOHDQRXWHTXLSPHQWWRULJIORRU0DNHXS
%+$ZLWK*%5WR¶
:2 0 3 3-607ULSLQKROHZLWK´FDVLQJFOHDQLQJWRROIURP¶WR¶8: .': .'LGQRWREVHUYHGDQ\GUDJ
SDVVLQJWKURXJK6DOWHOSDWFKORFDWHGDW¶WR¶&RQWLQXHWRDGG%3+RI33*.&/1D&OEULQHWUHDWHG
ZLWKELRFLGHGRZQDQQXOXV
:2 0 3 &LUFXODWHZDVKDQGUHFLSURFDWHGIURP¶WR¶SXPSUDWHRI%30#36,7RWDO%%/6ORVHVUDWHRI
%3+5RWDWLQJ530#.WRUTXH8: .': .57: .
:2 0 3 3-60±%ORZGRZQWRSGULYHDQGREVHUYHGZHOOVWDWLFORVVHV322+IURP¶WR¶EHORZ6DO7HOSDWFK8: .
': .$GGLQJ%3+RI33*.&/1D&OELRFLGHWUHDWHGEULQHSOXVSLSHGLVSODFHPHQWGRZQDQQXOXV
:2 0 3 &LUFXODWHZDVKIURP¶WR¶UHFLSURFDWHGEHORZ6DO7HOSDWFK3XPSUDWHRI%30#36,5RWDWH530#
.WRUTXH6HWEDFNRQHVWDQGLQGHUULFNIURP¶WR¶&LUFXODWHZDVKIURPWR¶UHFLSURFDWHGDERYH
6DOWHOSDWFK3XPSUDWHRI%30#36,5RWDWH530#.WRUTXH8: .': .57: .
1RWHKUVORVV %%/67RWDOORVV %%/6RI.&/1D&OEULQH
*DV5HDGLQJV
$YJ%DFNJURXQG*DV 0D[%DFNJURXQG*DV $YJ&RQQHFWLRQ*DV 0D[&RQQHFWLRQ*DV
$YJ'ULOO*DV 0D['ULOO*DV $YJ7ULS*DV 0D[7ULS*DV
'DLO\0XG9ROXPHV
7DQN$GGLWLRQ/RVV 7\SH 'HV 9ROXPHEEO
7DQN
+ROH
/RVV
:HOO1DPH63)125
:HOOERUH1DPH63)1
:HOO&RGH
-RE:25.29(5
:&(,/HYHO/(9(/
'DLO\5HSRUW
'DWH
5HSRUW
3DJHRI
&XPXODWLYH0XG9ROXPHV
$FWLYH9ROXPHEEO
+ROH9ROXPHEEO
$GGLWLRQVEEO
&XP$GGLWLRQVEEO
/RVVHVEEO
&XP/RVVHVEEO
'DLO\&RQWDFWV
3RVLWLRQ &RQWDFW1DPH &RPSDQ\ 7LWOH (PDLO 2IILFH 0RELOH
(QLUHSUHVHQWDWLYH 6WHYH/DZUHQFH $65&(QHUJ\6HUYLFHV 'ULOOLQJ6XSY VLGGULOOLQJ#HQLFRP
(QLUHSUHVHQWDWLYH 'DYLG6PLWK $65&(QHUJ\6HUYLFHV 'ULOOLQJ6XSYVLGGULOOLQJ#HQLFRP
(QLUHSUHVHQWDWLYH :DGH7KRPDV $65&(QHUJ\6HUYLFHV 5LJ&OHUN $.5LJ&OHUNV'R\RQ#HQLFRP
(QLUHSUHVHQWDWLYH 0DUN+XEOHU %HDFRQ +6( PDUNKXEOHU#H[WHUQDOHQLFRP
7RRO3XVK 9LNWRU7RUUHV 'R\RQ'ULOOLQJ 7RRO3XVKHU ULJ#GR\RQGULOOLQJFRP
7RRO3XVK (LQHU)OHDJOH 'R\RQ'ULOOLQJ 7RXU3XVKHU ULJ#GR\RQGULOOLQJFRP
6DIHW\5HSUHVHQWDWLYH +DUROG5LFKDUGVRQ 'R\RQ'ULOOLQJ +6( KULFKDUGVRQ#GR\RQGULOOLQJFRP
6DIHW\5HSUHVHQWDWLYH 'DYH6HQD 'R\RQ'ULOOLQJ +6( GVHQD#GR\RQGULOOLQJFRP
3HUVRQQHO/RJ32%
&RPSDQ\ 6HUY7\SH :RUN+KU 6WDQGE\+KU &RXQW 1RWH
/LWWOH5HG6HUYLFHV 3XPSLQJ
$65&(QHUJ\6HUYLFHV 5LJFOHUN
$65&(QHUJ\6HUYLFHV 62$
$65&(QHUJ\6HUYLFHV /LIW$GYLVRU
%($&21 +6(
&203(7(17,$ )XHOHU
9HWFR :HOOKHDG
7HQDULV 7KUHDG5HS
7$0 3DFNHU5HS
$65&(QHUJ\6HUYLFHV &RPSDQ\PDQ
+$//,%85721 0XG/RJJHUV
6&+/80%(5*(5 6/%0,6ZDFR0XG(QJLQHHU
6&+/80%(5*(5 &HPHQW
*%5 &DVLQJ6HUYLFH
%DNHU+XJKHV &RPSOHWLRQV
6&+/80%(5*(5 6/%0,6ZDFR0XGSODQW
6&+/80%(5*(5 6/%:,)
(;352 :HOO)ORZ
:25/(< 5LJ6XSSRUW
'2<21 2QVKRUH5LJ
%236WDFN &RPSRQHQWV
'HVFULSWLRQ
%236WDFN
6WDUW'DWH
/DVW&HUWLILFDWLRQ'DWH
3UHVVXUH5DWLQJSVL
7\SH 0DNH 0RGHO ,'1RPLQ 35DQJHSVL /DVW&HUW'DWH
$QQXODU +\GULO *.
;9%5
V +\GULO 03/
%OLQG6KHDU5DP +\GULO 03/
[9%5V +\GULO 03/
6ORZ&LUFXODWLRQ5DWHV
3XPS1XPEHU 0DNH0RGHO
6WDUW'DWH (QG'DWH /LQHU6L]HLQ 9ROXPH3HU6WURNH2YHUULGHEEOVWN 0D[3UHVVXUHSVL
'DWH 'HSWKIW.% 6ORZ6SG 6WURNHVVSP 3SVL (II 4)ORZJSP
'DLO\%XON
6XSSO\,WHP'HVFULSWLRQ(TXLSPHQW)XHO 8QLW/DEHO*DO 8QLW6L]H1RWH
'DWH
&RQVXPHG
5HFHLYHG
5HWXUQHG &XP&RQVXPHG
&XP5HFHLYHG
&XP5HWXUQHG
&XP2Q/RF
1RWH
6XSSO\,WHP'HVFULSWLRQ0XG3ODQW%RLOHUV 8QLW/DEHO*DO 8QLW6L]H 1RWH
'DWH
&RQVXPHG
5HFHLYHG
5HWXUQHG &XP&RQVXPHG
&XP5HFHLYHG
&XP5HWXUQHG
&XP2Q/RF
1RWH
6XSSO\,WHP'HVFULSWLRQ5LJ)XHO 8QLW/DEHOJDOXV 8QLW6L]H1RWH
'DWH
&RQVXPHG
5HFHLYHG
5HWXUQHG &XP&RQVXPHG
&XP5HFHLYHG
&XP5HWXUQHG
&XP2Q/RF
1RWH
6XSSO\,WHP'HVFULSWLRQ5LJ:DWHU 8QLW/DEHOEEO 8QLW6L]H1RWH
'DWH
&RQVXPHG
5HFHLYHG
5HWXUQHG &XP&RQVXPHG
&XP5HFHLYHG
&XP5HWXUQHG
&XP2Q/RF
1RWH
6XSSO\,WHP'HVFULSWLRQ:,)%RLOHUV 8QLW/DEHO*DO 8QLW6L]H 1RWH
'DWH
&RQVXPHG
5HFHLYHG
5HWXUQHG &XP&RQVXPHG
&XP5HFHLYHG
&XP5HWXUQHG
&XP2Q/RF
1RWH
/DVW$XWKRULW\9LVLW
'DWH
7RWLQVS1EU 7RWDO,1&QXPEHU &RPPHQW
$2*&&UHSUHVHQWHQWLYH*X\&RRNZDLYHGZLWQHVVRIWHVW#KUV
6723&DUGV6XEPLWWHG
&RPSDQ\ 5SWV &RP
'R\RQ'ULOOLQJ,QF 2EVHUYDWLRQV
'R\RQ'ULOOLQJ,QF6WRS:RUN
'R\RQ'ULOOLQJ,QF 3-60
V
'R\RQ'ULOOLQJ,QF +D]DUG,'
(QL +D]DUG,'
([SUR 6WRS:RUN
([SUR 2EVHUYDWLRQV
*%5 6WRS:RUN
+DOOLEXUWRQ 2EVHUYDWLRQV
+DOOLEXUWRQ 6WRS:RUN
0,6ZDFR +D]DUG,'
0,6ZDFR 2EVHUYDWLRQV
0,6ZDFR 6WRS:RUN
:RUOH\+D]DUG,'
:RUOH\ 2EVHUYDWLRQV
:RUOH\ 6WRS:RUN
:HOO1DPH63)125
:HOOERUH1DPH63)1
:HOO&RGH
-RE:25.29(5
:&(,/HYHO/(9(/
'DLO\5HSRUW
'DWH
5HSRUW
3DJHRI
*HQHUDO1RWHV
&RPPHQW
:HOO1DPH63)125
:HOOERUH1DPH63)1
:HOO&RGH
-RE:25.29(5
:&(,/HYHO/(9(/
'DLO\5HSRUW
'DWH
5HSRUW
3DJHRI
:HOO+HDGHU
3HUPLW&RQFHVVLRQ1
$'/
2SHUDWRU
(1,3(752/(80
6XEVLGLDU\
(1,3HWUROHXP&R,QF
,QLWLDO/DKHH&RGH
'(9(/230(17:(//
5RWDU\7DEOH(OHYDWLRQIW
*URXQG/HYHOIW )LUVW)ODQJHIW
5.%%DVH)ODQJHIW
5.%7XELQJ6SRROIW
5LJV
5LJ1DPH
5,*
&RQWUDFWRU
'2<21
5LJ7\SH
/$1'5,*
5LJ1XP
5LJ6WDUW'DWH
5LJ5HOHDVH'DWH
'DLO\,QIRUPDWLRQ
:HDWKHU
&OHDU:&
7HPSHUDWXUH)
:LQG
(#03+
'D\V/7,GD\V 'D\V5,GD\V 32%
6DIHW\,QFLGHQWV1HDU0LVV
'DWH
&DWHJRU\ 7\SH 6XEW\SH 6HYHULW\ &DXVH /RVWWLPH"
1R
&RPPHQW
=HUR+6(,QFLGHQWV5HYLHZHGWKH&
VZLWKDIRFXVRQ&XOWXUH5HYLHZHG(QL*ROGHQ5XOHVZLWKDIRFXVRQ3HUPLWWRZRUN
6DIHW\'ULOOV
7\SH 2FFXU /DVW'DWH 1H[W'DWH
'D\V8QWLO1H[W&KHFN
GD\V
$XWKRULW\9LVLW
%23'ULOO
%237HVWSUHVVXUH
5LJ,QVSHFWLRQ
6DIHW\0HHWLQJ
6SLOO'ULOO
77%23'ULOO
77&DPS)LUH'ULOO
77+6'ULOO
77.LFN:KLOH7ULSSLQJ
770DQ'RZQ'ULOO
775LJ(YDF'ULOO
775LJ(YDFXDWLRQ'ULOO
775LJ)LUH'ULOO
&DVLQJVVHDW
&DV7\SH 2'LQ ,'LQ *UDGH 7RSIW.% %RWWRPIW.% 79'%RWIW.% /DQGLQJ'DWH
&21'8&725
&$6,1* /
&$6,1* /
/,1(5
/,1(5 /
/DVW&HPHQWLQJ
&HPHQWLQJ6WDUW'DWH6WULQJ/,1(5IW.%&RPPHQW;OLQHUKDQJHUSDFNHUVHWLQVLGHOLQHU72OLQHU#
EWPRIIORDWVKRH#
6WJ 7RSIW.% 7RS0HDV0HWK %WPIW.% &RP
6/%7HVWOLQHVWRSVL6/%SXPSEEOV0XG3XVKEEOVFHPHQWGURSZLSHUEDOOEEOV
0XG3XVKDQGULJGLVSODFHZEEOVVOLFNZDWHU6WLQJLQWROLQHUSDFNHUDQGVTXHH]HFHPHQWZEEOVRIVOLFN
ZDWHU&,3#KUV
-RE,QIRUPDWLRQ
-RE3KDVH
:25.29(5
3ODQQHG6WDUW'DWH
6WDUW'DWH
(QG'DWH 3'XUDWLRQGD\V
'DLO\6XPPDU\2SHUDWLRQV
K)RUHFDVW
3XOORXW7DPSDFNHUWRLQYHVWLJDWHSRVVLEOHIDLOXUH±SURFHHGWRWHVWFDVLQJSHUSURFHGXUH
K6XPPDU\
322+DQG/'´FOHDQRXWDVVHPEO\5,+ZLWK7$0SDFNHUSHUIRUPHGFDVLQJWHVWLQFRQFOXVLYHUHVXOWV6WDUW322+7$0SDFNHU
2SHUDWLRQDW
3UHSDULQJWRUXQLQKROHZLWKFOHDQRXWDVVHPEO\
7LPH/RJ
6WDUW
7LPH
(QG
7LPH 'XUKU
&XP'XU
KU3KDVH 2SU $FW 3ODQ 2SHU'HVFU
:2 0 3 &RQWLQXHWRSXOORXWRIKROHZLWK´FDVLQJFOHDQRXWDVVHPEO\IURPµWRVXUIDFHEUHDNGRZQ%+$FOHDQDQGFOHDU
ULJIORRU$GGLQJ%3+RI33*.&/1D&OELRFLGHWUHDWHGEULQHSOXVSLSHGLVSODFHPHQWGRZQDQQXOXV
:2 0 3 0RELOL]H7$0SDFNHUWRULJIORRUDQGPDNHXSVDPH
:2 0 3 7ULSLQKROHZLWK´7$0SDFNHUWR¶SRVLWLRQ7$0SDFNHUZLWK&2(DW¶8: .': .
:2 0 3 6FUHZLQWRWRSGULYHDQGSXPS%%/RI33*.&/1D&OEULQHZLWKELRFLGHGRZQGULOOSLSHDW%30#36,
'URS´EDOOGRZQGULOOSLSHDQGSXPS%%/RIEULQHDW%30#36,6ORZUDWHWRò%30DQGFRQWLQXHWRSXPS
DQDGGLWLRQDO%%/#36,IRUDWRWDORI%%/6SXPSHG:LWKEDOORQVHDWSUHVVXUHXSWR36,VHHQSRSSHW
VKHDUFRQWLQXHWRSUHVVXUHXSWR36,DQGZDLWHGPLQXWHVDQGSXOO.RYHUXSZHLJKWWRYHULI\DQFKRUHQJDJHPHQW
3UHVVXUHXSWR36,WRLQIODWHHOHPHQWDQGKROGIRUPLQXWHVSUHVVXUHGXSWR36,DQGFKRNHVKHDUHGZLWKDOO
SUHVVXUHIDOOLQJRII
:2 0 3 %ORZGRZQWRSGULYHDQGULJXSFDVLQJWHVWLQJHTXLSPHQWIORRGVWDFNDQGFKRNHFORVHDQQXODUSUHVVXUHWHVWFDVLQJLQ
36,LQFUHPHQWVWR36,PRQLWRUHGWKH%DQQXOXVZKLFKLQFUHDVHGIURP36,WR36,FRQWLQXHWRWHVWIRU
PLQXWHVDQG$DQQXOXVSUHVVXUHEOHHGRII36,%OHGRIISUHVVXUHDQGGHFLVLRQWRUHWHVW±LQFUHDVHGSUHVVXUHLQ36,
LQFUHPHQWVWR36,PRQLWRUHGWKH%DQQXOXVLQLWLDOSUHVVXUHSVLEXLOGLQJWRDPD[RISVL1RWHGXULQJWHVWORVW
DWRWDORI36,RQ$DQQXOXVZLWKDSUHVVXUHIDOOLQJ36,RQ%DQQXOXV
:2 0 3 3HUIRUPHGWKLUGFDVLQJWHVWIRUDQKRXUVWDJLQJSUHVVXUHXSLQ36,LQFUHPHQWVWR36,PRQLWRULQJWKH%DQQXOXV
ZLWKLQLWLDOSUHVVXUHRI36,DQGDPD[RI36,,QPLQXWHVSUHVVXUHGURSSHG36,DQGDWPLQXWHVSUHVVXUH
KDGIHOODQDGGLWLRQDO36,IRUDWRWDORI36,&RQWLQXHPRQLWRULQJWKH$DQQXOXVIRUDQDGGLWLRQDOPLQXWHVZKLFK
SUHVVXUHIDOOLQJWR36,DQG%DQQXOXVVWDELOL]HG#36,$WPLQXWHVLQWRWKHWHVW$DQQXOXVSUHVVXUHIHOOWR
36,DQG%DQQXOXVSUHVVXUHGURSSHGWR36,DQGWKHQUHWXUQHGWR36,3RVVLEOHSDFNHUIDLOXUH
:2 0 3 &RQILUPHGWKDWDOODQQXOXVDQGVXUIDFHEOHHGRIIDQGRSHQDQQXODU±ILOOKROHZLWK%%/6DQGPRQLWRU'HFLVLRQPDGHWR
VODFNRIIDQGFRQILUPLISDFNHUKDGUHOHDVHGSULRUWRSXOOLQJRXWRIKROHVODFNHGRII¶
:2 0 3 3XOORXWRIKROHZLWK7$0´LQIODWDEOHSDFNHUWHVWSDFNHUIURP¶WR¶VWDQGLQJEDFNGULOOSLSHLQGHUULFN8:
.': .
1RWHKUVORVV %%/67RWDOORVV %%/6RI.&/1D&OEULQH
*DV5HDGLQJV
$YJ%DFNJURXQG*DV 0D[%DFNJURXQG*DV $YJ&RQQHFWLRQ*DV 0D[&RQQHFWLRQ*DV
$YJ'ULOO*DV 0D['ULOO*DV $YJ7ULS*DV 0D[7ULS*DV
:HOO1DPH63)125
:HOOERUH1DPH63)1
:HOO&RGH
-RE:25.29(5
:&(,/HYHO/(9(/
'DLO\5HSRUW
'DWH
5HSRUW
3DJHRI
'DLO\0XG9ROXPHV
7DQN$GGLWLRQ/RVV 7\SH 'HV 9ROXPHEEO
7DQN
+ROH
/RVV
&XPXODWLYH0XG9ROXPHV
$FWLYH9ROXPHEEO
+ROH9ROXPHEEO
$GGLWLRQVEEO
&XP$GGLWLRQVEEO
/RVVHVEEO
&XP/RVVHVEEO
'DLO\&RQWDFWV
3RVLWLRQ &RQWDFW1DPH &RPSDQ\ 7LWOH (PDLO 2IILFH 0RELOH
(QLUHSUHVHQWDWLYH 6WHYH/DZUHQFH $65&(QHUJ\6HUYLFHV 'ULOOLQJ6XSY VLGGULOOLQJ#HQLFRP
(QLUHSUHVHQWDWLYH 'DYLG6PLWK $65&(QHUJ\6HUYLFHV 'ULOOLQJ6XSYVLGGULOOLQJ#HQLFRP
(QLUHSUHVHQWDWLYH 0LWFK%LOOLQJWRQ $65&(QHUJ\6HUYLFHV 5LJ&OHUN $.5LJ&OHUNV'R\RQ#HQLFRP
(QLUHSUHVHQWDWLYH 0DUN+XEOHU %HDFRQ +6( PDUNKXEOHU#H[WHUQDOHQLFRP
7RRO3XVK 9LNWRU7RUUHV 'R\RQ'ULOOLQJ 7RRO3XVKHU ULJ#GR\RQGULOOLQJFRP
7RRO3XVK (LQHU)OHDJOH 'R\RQ'ULOOLQJ 7RXU3XVKHU ULJ#GR\RQGULOOLQJFRP
6DIHW\5HSUHVHQWDWLYH +DUROG5LFKDUGVRQ 'R\RQ'ULOOLQJ +6( KULFKDUGVRQ#GR\RQGULOOLQJFRP
6DIHW\5HSUHVHQWDWLYH 'DYH6HQD 'R\RQ'ULOOLQJ +6( GVHQD#GR\RQGULOOLQJFRP
3HUVRQQHO/RJ32%
&RPSDQ\ 6HUY7\SH :RUN+KU 6WDQGE\+KU &RXQW 1RWH
6&+/80%(5*(5 &HPHQW
/LWWOH5HG6HUYLFHV 3XPSLQJ
$65&(QHUJ\6HUYLFHV 62$
$65&(QHUJ\6HUYLFHV /LIW$GYLVRU
%($&21 +6(
&203(7(17,$ )XHOHU
9HWFR :HOOKHDG
7HQDULV 7KUHDG5HS
7$0 3DFNHU5HS
$65&(QHUJ\6HUYLFHV &RPSDQ\PDQ
$65&(QHUJ\6HUYLFHV 5LJFOHUN
+$//,%85721 0XG/RJJHUV
6&+/80%(5*(5 6/%0,6ZDFR0XG(QJLQHHU
*%5 &DVLQJ6HUYLFH
%DNHU+XJKHV &RPSOHWLRQV
6&+/80%(5*(5 6/%0,6ZDFR0XGSODQW
6&+/80%(5*(5 6/%:,)
(;352 :HOO)ORZ
:25/(< 5LJ6XSSRUW
'2<21 2QVKRUH5LJ
%236WDFN &RPSRQHQWV
'HVFULSWLRQ
%236WDFN
6WDUW'DWH
/DVW&HUWLILFDWLRQ'DWH
3UHVVXUH5DWLQJSVL
7\SH 0DNH 0RGHO ,'1RPLQ 35DQJHSVL /DVW&HUW'DWH
$QQXODU +\GULO *.
;9%5
V +\GULO 03/
%OLQG6KHDU5DP +\GULO 03/
[9%5V +\GULO 03/
6ORZ&LUFXODWLRQ5DWHV
3XPS1XPEHU 0DNH0RGHO
6WDUW'DWH (QG'DWH /LQHU6L]HLQ 9ROXPH3HU6WURNH2YHUULGHEEOVWN 0D[3UHVVXUHSVL
'DWH 'HSWKIW.% 6ORZ6SG 6WURNHVVSP 3SVL (II 4)ORZJSP
'DLO\%XON
6XSSO\,WHP'HVFULSWLRQ(TXLSPHQW)XHO 8QLW/DEHO*DO 8QLW6L]H1RWH
'DWH
&RQVXPHG
5HFHLYHG
5HWXUQHG &XP&RQVXPHG
&XP5HFHLYHG
&XP5HWXUQHG
&XP2Q/RF
1RWH
6XSSO\,WHP'HVFULSWLRQ0XG3ODQW%RLOHUV 8QLW/DEHO*DO 8QLW6L]H 1RWH
'DWH
&RQVXPHG
5HFHLYHG
5HWXUQHG &XP&RQVXPHG
&XP5HFHLYHG
&XP5HWXUQHG
&XP2Q/RF
1RWH
6XSSO\,WHP'HVFULSWLRQ5LJ)XHO 8QLW/DEHOJDOXV 8QLW6L]H1RWH
'DWH
&RQVXPHG
5HFHLYHG
5HWXUQHG &XP&RQVXPHG
&XP5HFHLYHG
&XP5HWXUQHG
&XP2Q/RF
1RWH
6XSSO\,WHP'HVFULSWLRQ5LJ:DWHU 8QLW/DEHOEEO 8QLW6L]H1RWH
'DWH
&RQVXPHG
5HFHLYHG
5HWXUQHG &XP&RQVXPHG
&XP5HFHLYHG
&XP5HWXUQHG
&XP2Q/RF
1RWH
6XSSO\,WHP'HVFULSWLRQ:,)%RLOHUV 8QLW/DEHO*DO 8QLW6L]H 1RWH
'DWH
&RQVXPHG
5HFHLYHG
5HWXUQHG &XP&RQVXPHG
&XP5HFHLYHG
&XP5HWXUQHG
&XP2Q/RF
1RWH
/DVW$XWKRULW\9LVLW
'DWH
7RWLQVS1EU 7RWDO,1&QXPEHU &RPPHQW
$2*&&UHSUHVHQWHQWLYH*X\&RRNZDLYHGZLWQHVVRIWHVW#KUV
6723&DUGV6XEPLWWHG
&RPSDQ\ 5SWV &RP
'R\RQ'ULOOLQJ,QF 2EVHUYDWLRQV
'R\RQ'ULOOLQJ,QF 3-60
V
'R\RQ'ULOOLQJ,QF 6WRS:RUN
'R\RQ'ULOOLQJ,QF +D]DUG,'
+DOOLEXUWRQ 2EVHUYDWLRQV
0,6ZDFR 2EVHUYDWLRQV
:RUOH\ 2EVHUYDWLRQV
:RUOH\ 6WRS:RUN
*HQHUDO1RWHV
&RPPHQW
:HOO1DPH63)125
:HOOERUH1DPH63)1
:HOO&RGH
-RE:25.29(5
:&(,/HYHO/(9(/
'DLO\5HSRUW
'DWH
5HSRUW
3DJHRI
:HOO+HDGHU
3HUPLW&RQFHVVLRQ1
$'/
2SHUDWRU
(1,3(752/(80
6XEVLGLDU\
(1,3HWUROHXP&R,QF
,QLWLDO/DKHH&RGH
'(9(/230(17:(//
5RWDU\7DEOH(OHYDWLRQIW
*URXQG/HYHOIW )LUVW)ODQJHIW
5.%%DVH)ODQJHIW
5.%7XELQJ6SRROIW
5LJV
5LJ1DPH
5,*
&RQWUDFWRU
'2<21
5LJ7\SH
/$1'5,*
5LJ1XP
5LJ6WDUW'DWH
5LJ5HOHDVH'DWH
'DLO\,QIRUPDWLRQ
:HDWKHU
2YHUFDVW:&
7HPSHUDWXUH)
:LQG
1:#03+
'D\V/7,GD\V 'D\V5,GD\V 32%
6DIHW\,QFLGHQWV1HDU0LVV
'DWH
&DWHJRU\ 7\SH 6XEW\SH 6HYHULW\ &DXVH /RVWWLPH"
1R
&RPPHQW
=HUR+6(,QFLGHQWV5HYLHZHGWKH&
VZLWKDIRFXVRQFRPPLWPHQW5HYLHZHG(QL*ROGHQ5XOHVZLWKDIRFXVRQ)LUH6DIHW\
6DIHW\'ULOOV
7\SH 2FFXU /DVW'DWH 1H[W'DWH
'D\V8QWLO1H[W&KHFN
GD\V
$XWKRULW\9LVLW
%23'ULOO
%237HVWSUHVVXUH
)LUH'ULOO
.LFN:KLOH7ULSSLQJ
5LJ,QVSHFWLRQ
6DIHW\0HHWLQJ
6SLOO'ULOO
77%23'ULOO
77&DPS)LUH'ULOO
77+6'ULOO
77.LFN:KLOH7ULSSLQJ
770DQ'RZQ'ULOO
775LJ(YDF'ULOO
775LJ(YDFXDWLRQ'ULOO
775LJ)LUH'ULOO
&DVLQJVVHDW
&DV7\SH 2'LQ ,'LQ *UDGH 7RSIW.% %RWWRPIW.% 79'%RWIW.% /DQGLQJ'DWH
&21'8&725
&$6,1* /
&$6,1* /
/,1(5
/,1(5 /
/DVW&HPHQWLQJ
&HPHQWLQJ6WDUW'DWH6WULQJ/,1(5IW.%&RPPHQW;OLQHUKDQJHUSDFNHUVHWLQVLGHOLQHU72OLQHU#
EWPRIIORDWVKRH#
6WJ 7RSIW.% 7RS0HDV0HWK %WPIW.% &RP
6/%7HVWOLQHVWRSVL6/%SXPSEEOV0XG3XVKEEOVFHPHQWGURSZLSHUEDOOEEOV
0XG3XVKDQGULJGLVSODFHZEEOVVOLFNZDWHU6WLQJLQWROLQHUSDFNHUDQGVTXHH]HFHPHQWZEEOVRIVOLFN
ZDWHU&,3#KUV
-RE,QIRUPDWLRQ
-RE3KDVH
:25.29(5
3ODQQHG6WDUW'DWH
6WDUW'DWH
(QG'DWH 3'XUDWLRQGD\V
'DLO\6XPPDU\2SHUDWLRQV
K)RUHFDVW
5,+DQGVHW7DP,QIODWDEOHSDFNHU7HVW´FDVLQJ±322+DQGWHVW%23±$2*&&%ULDQ%L[E\WRZLWQHVV
K6XPPDU\
322+ZLWK7$0,QIODWDEOHSDFNHU/'3HUIRUPFOHDQRXWUXQZLWKVFUDSHUPDJQHW387$0,QIODWDEOHSDFNHUWULSLQKROH
2SHUDWLRQDW
3HUIRUPLQJFDVLQJWHVW
7LPH/RJ
6WDUW
7LPH
(QG
7LPH 'XUKU
&XP'XU
KU3KDVH 2SU $FW 3ODQ 2SHU'HVFU
:2 0 3 &RQWLQXHWRSXOORXWRIKROHZLWK7$0,QIODWDEOHWHVWSDFNHUIURP¶WRVXUIDFHFRQWLQXHWRDGG%3+RI33*
.&/1D&OELRFLGHWUHDWHGEULQHSOXVSLSHGLVSODFHPHQWGRZQDQQXOXV
:2 0 3 /D\GRZQ7$0,QIODWDEOHSDFNHUFOHDQDQGFOHDUULJIORRU1RWHGDPDJHWRDQFKRUVODWDUHDRIHOHPHQW$GGLQJ%3+RI
33*.&/1D&OELRFLGHWUHDWHGEULQH
:2 0 3 0RELOL]H´5D]RUEDFNVFUDSSHUDQG0DJQRVWDUPDJQHWWRULJIORRUDQGPDNHXSVDPH&RQWLQXHWRDGG%3+RI
33*.&/1D&OELRFLGHWUHDWHGEULQH
:2 0 3 7ULSLQKROHZLWK´5D]RUEDFNVFUDSSHUDQG0DJQRVWDUPDJQHW%+$WR¶8: .':.5:.&RQWLQXH
WRDGG%3+RI33*.&/1D&OELRFLGHWUHDWHGEULQH
:2 0 3 &LUFXODWHERWWRPVXSZKLOHUHFLSURFDWLQJFDVLQJVFUDSSHUIURP¶WR¶ZLWKSXPSUDWH%30#36,ZKLOH
URWDWLQJ530#.WRUTXH
:2 0 3 &XWDQGVOLSGULOOLQJOLQHLQVSHFWDQGDGMXVWGUDZZRUNEUDNHVVHUYLFHGUDZZRUNVWRSGULYHDQGEORFNVFDOLEUDWHGEORFN
KHLJKW&RQWLQXHWRDGG%3+RI33*.&/1D&OELRFLGHWUHDWHGEULQH
:2 0 3 3XOORXWRIKROHZLWK´5D]RUEDFN6FUDSSHUDQG0DJQRVWDUPDJQHWIURP¶WRVXUIDFHDQGOD\GRZQ%+$&RQWLQXH
WRDGG%3+RI33*.&/1D&OELRFLGHWUHDWHGEULQHDQGSLSHGLVSODFHPHQWGRZQDQQXOXV
:2 0 3 3LFNXS7$0,QIODWDEOH3DFNHU%+$¶SHU7$05HS8: .$GGLQJ%3+RI33*.&/1D&OELRFLGH
WUHDWHGEULQH
:2 0 3 3-60±7ULSLQWKHKROHZLWK7$0,QIODWHG3DFNHUIURP¶WR¶8: .': .$GGLQJ%3+RI33*
.&/1D&OELRFLGHWUHDWHGEULQH
1RWHKUVORVV %%/67RWDOORVV %%/6RI.&/1D&OEULQH
1RWH1RWLILHG$2*&&RI%23WHVW#+56%ULDQ%L[E\UHSOLHG#WRZLWQHVVWHVW
*DV5HDGLQJV
$YJ%DFNJURXQG*DV 0D[%DFNJURXQG*DV $YJ&RQQHFWLRQ*DV 0D[&RQQHFWLRQ*DV
$YJ'ULOO*DV 0D['ULOO*DV $YJ7ULS*DV 0D[7ULS*DV
'DLO\0XG9ROXPHV
7DQN$GGLWLRQ/RVV 7\SH 'HV 9ROXPHEEO
7DQN
+ROH
:HOO1DPH63)125
:HOOERUH1DPH63)1
:HOO&RGH
-RE:25.29(5
:&(,/HYHO/(9(/
'DLO\5HSRUW
'DWH
5HSRUW
3DJHRI
'DLO\0XG9ROXPHV
7DQN$GGLWLRQ/RVV 7\SH 'HV 9ROXPHEEO
/RVV
&XPXODWLYH0XG9ROXPHV
$FWLYH9ROXPHEEO
+ROH9ROXPHEEO
$GGLWLRQVEEO
&XP$GGLWLRQVEEO
/RVVHVEEO
&XP/RVVHVEEO
'DLO\&RQWDFWV
3RVLWLRQ &RQWDFW1DPH &RPSDQ\ 7LWOH (PDLO 2IILFH 0RELOH
(QLUHSUHVHQWDWLYH 6WHYH/DZUHQFH $65&(QHUJ\6HUYLFHV 'ULOOLQJ6XSY VLGGULOOLQJ#HQLFRP
(QLUHSUHVHQWDWLYH 'DYLG6PLWK $65&(QHUJ\6HUYLFHV 'ULOOLQJ6XSYVLGGULOOLQJ#HQLFRP
(QLUHSUHVHQWDWLYH 0LWFK%LOOLQJWRQ $65&(QHUJ\6HUYLFHV 5LJ&OHUN $.5LJ&OHUNV'R\RQ#HQLFRP
(QLUHSUHVHQWDWLYH 0DUN+XEOHU %HDFRQ +6( PDUNKXEOHU#H[WHUQDOHQLFRP
7RRO3XVK 5\DQ3DQNUDW] 'R\RQ'ULOOLQJ 7RRO3XVKHU ULJ#GR\RQGULOOLQJFRP
7RRO3XVK (LQHU)OHDJOH 'R\RQ'ULOOLQJ 7RXU3XVKHU ULJ#GR\RQGULOOLQJFRP
6DIHW\5HSUHVHQWDWLYH +DUROG5LFKDUGVRQ 'R\RQ'ULOOLQJ +6( KULFKDUGVRQ#GR\RQGULOOLQJFRP
6DIHW\5HSUHVHQWDWLYH 'DYH6HQD 'R\RQ'ULOOLQJ +6( GVHQD#GR\RQGULOOLQJFRP
3HUVRQQHO/RJ32%
&RPSDQ\ 6HUY7\SH :RUN+KU 6WDQGE\+KU &RXQW 1RWH
6&+/80%(5*(5 &HPHQW
/LWWOH5HG6HUYLFHV 3XPSLQJ
$65&(QHUJ\6HUYLFHV 5LJFOHUN
$65&(QHUJ\6HUYLFHV 62$
$65&(QHUJ\6HUYLFHV /LIW$GYLVRU
%($&21 +6(
&203(7(17,$ )XHOHU
9HWFR :HOOKHDG
7HQDULV 7KUHDG5HS
7$0 3DFNHU5HS
$65&(QHUJ\6HUYLFHV &RPSDQ\PDQ
+$//,%85721 0XG/RJJHUV
6&+/80%(5*(5 6/%0,6ZDFR0XG(QJLQHHU
*%5 &DVLQJ6HUYLFH
%DNHU+XJKHV &RPSOHWLRQV
6&+/80%(5*(5 6/%0,6ZDFR0XGSODQW
6&+/80%(5*(5 6/%:,)
(;352 :HOO)ORZ
:25/(< 5LJ6XSSRUW
'2<21 2QVKRUH5LJ
%236WDFN &RPSRQHQWV
'HVFULSWLRQ
%236WDFN
6WDUW'DWH
/DVW&HUWLILFDWLRQ'DWH
3UHVVXUH5DWLQJSVL
7\SH 0DNH 0RGHO ,'1RPLQ 35DQJHSVL /DVW&HUW'DWH
$QQXODU +\GULO *.
;9%5
V +\GULO 03/
%OLQG6KHDU5DP +\GULO 03/
[9%5V +\GULO 03/
6ORZ&LUFXODWLRQ5DWHV
3XPS1XPEHU 0DNH0RGHO
6WDUW'DWH (QG'DWH /LQHU6L]HLQ 9ROXPH3HU6WURNH2YHUULGHEEOVWN 0D[3UHVVXUHSVL
'DWH 'HSWKIW.% 6ORZ6SG 6WURNHVVSP 3SVL (II 4)ORZJSP
'DLO\%XON
6XSSO\,WHP'HVFULSWLRQ(TXLSPHQW)XHO 8QLW/DEHO*DO 8QLW6L]H1RWH
'DWH
&RQVXPHG
5HFHLYHG
5HWXUQHG &XP&RQVXPHG
&XP5HFHLYHG
&XP5HWXUQHG
&XP2Q/RF
1RWH
6XSSO\,WHP'HVFULSWLRQ0XG3ODQW%RLOHUV 8QLW/DEHO*DO 8QLW6L]H 1RWH
'DWH
&RQVXPHG
5HFHLYHG
5HWXUQHG &XP&RQVXPHG
&XP5HFHLYHG
&XP5HWXUQHG
&XP2Q/RF
1RWH
6XSSO\,WHP'HVFULSWLRQ5LJ)XHO 8QLW/DEHOJDOXV 8QLW6L]H1RWH
'DWH
&RQVXPHG
5HFHLYHG
5HWXUQHG &XP&RQVXPHG
&XP5HFHLYHG
&XP5HWXUQHG
&XP2Q/RF
1RWH
6XSSO\,WHP'HVFULSWLRQ5LJ:DWHU 8QLW/DEHOEEO 8QLW6L]H1RWH
'DWH
&RQVXPHG
5HFHLYHG
5HWXUQHG &XP&RQVXPHG
&XP5HFHLYHG
&XP5HWXUQHG
&XP2Q/RF
1RWH
6XSSO\,WHP'HVFULSWLRQ:,)%RLOHUV 8QLW/DEHO*DO 8QLW6L]H 1RWH
'DWH
&RQVXPHG
5HFHLYHG
5HWXUQHG &XP&RQVXPHG
&XP5HFHLYHG
&XP5HWXUQHG
&XP2Q/RF
1RWH
/DVW$XWKRULW\9LVLW
'DWH
7RWLQVS1EU 7RWDO,1&QXPEHU &RPPHQW
$2*&&UHSUHVHQWHQWLYH*X\&RRNZDLYHGZLWQHVVRIWHVW#KUV
6723&DUGV6XEPLWWHG
&RPSDQ\ 5SWV &RP
'R\RQ'ULOOLQJ,QF 3-60
V
'R\RQ'ULOOLQJ,QF 2EVHUYDWLRQV
'R\RQ'ULOOLQJ,QF +D]DUG,'
([SUR 6WRS:RUN
([SUR 2EVHUYDWLRQV
+DOOLEXUWRQ 2EVHUYDWLRQV
+DOOLEXUWRQ 6WRS:RUN
0,6ZDFR 2EVHUYDWLRQV
0,6ZDFR 6WRS:RUN
:RUOH\ 2EVHUYDWLRQV
*HQHUDO1RWHV
&RPPHQW
:HOO1DPH63)125
:HOOERUH1DPH63)1
:HOO&RGH
-RE:25.29(5
:&(,/HYHO/(9(/
'DLO\5HSRUW
'DWH
5HSRUW
3DJHRI
:HOO+HDGHU
3HUPLW&RQFHVVLRQ1
$'/
2SHUDWRU
(1,3(752/(80
6XEVLGLDU\
(1,3HWUROHXP&R,QF
,QLWLDO/DKHH&RGH
'(9(/230(17:(//
5RWDU\7DEOH(OHYDWLRQIW
*URXQG/HYHOIW )LUVW)ODQJHIW
5.%%DVH)ODQJHIW
5.%7XELQJ6SRROIW
5LJV
5LJ1DPH
5,*
&RQWUDFWRU
'2<21
5LJ7\SH
/$1'5,*
5LJ1XP
5LJ6WDUW'DWH
5LJ5HOHDVH'DWH
'DLO\,QIRUPDWLRQ
:HDWKHU
&OHDU:&
7HPSHUDWXUH)
:LQG
1#03+
'D\V/7,GD\V 'D\V5,GD\V 32%
6DIHW\,QFLGHQWV1HDU0LVV
'DWH
&DWHJRU\ 7\SH 6XEW\SH 6HYHULW\ &DXVH /RVWWLPH"
1R
&RPPHQW
=HUR+6(,QFLGHQWV5HYLHZHGWKH&
VZLWKDIRFXVRQ&KDQJHRIPDQDJHPHQW5HYLHZHG(QL*ROGHQ5XOHVZLWKDIRFXVRQ)LUH6DIHW\
6DIHW\'ULOOV
7\SH 2FFXU /DVW'DWH 1H[W'DWH
'D\V8QWLO1H[W&KHFN
GD\V
$XWKRULW\9LVLW
%23'ULOO
%237HVWSUHVVXUH
)LUH'ULOO
.LFN:KLOH7ULSSLQJ
5LJ,QVSHFWLRQ
6DIHW\0HHWLQJ
6SLOO'ULOO
77%23'ULOO
77&DPS)LUH'ULOO
77+6'ULOO
77.LFN:KLOH7ULSSLQJ
770DQ'RZQ'ULOO
775LJ(YDF'ULOO
775LJ(YDFXDWLRQ'ULOO
775LJ)LUH'ULOO
&DVLQJVVHDW
&DV7\SH 2'LQ ,'LQ *UDGH 7RSIW.% %RWWRPIW.% 79'%RWIW.% /DQGLQJ'DWH
&21'8&725
&$6,1* /
&$6,1* /
/,1(5
/,1(5 /
/DVW&HPHQWLQJ
&HPHQWLQJ6WDUW'DWH6WULQJ/,1(5IW.%&RPPHQW;OLQHUKDQJHUSDFNHUVHWLQVLGHOLQHU72OLQHU#
EWPRIIORDWVKRH#
6WJ 7RSIW.% 7RS0HDV0HWK %WPIW.% &RP
6/%7HVWOLQHVWRSVL6/%SXPSEEOV0XG3XVKEEOVFHPHQWGURSZLSHUEDOOEEOV
0XG3XVKDQGULJGLVSODFHZEEOVVOLFNZDWHU6WLQJLQWROLQHUSDFNHUDQGVTXHH]HFHPHQWZEEOVRIVOLFN
ZDWHU&,3#KUV
-RE,QIRUPDWLRQ
-RE3KDVH
:25.29(5
3ODQQHG6WDUW'DWH
6WDUW'DWH
(QG'DWH 3'XUDWLRQGD\V
'DLO\6XPPDU\2SHUDWLRQV
K)RUHFDVW
&RPSOHWH%23WHVW±7HVWFDVLQJSHUSURFHGXUH
K6XPPDU\
6HW7$0,QIODWDEOHSDFNHUDQGWHVWSHUSURFHGXUHSUHVVXUHORVV322+IRXQGSDFNHUGDPDJH7HVW%23ZLWK$2*&&ZLWQHVV
2SHUDWLRQDW
7HVWLQJFDVLQJZLWKUHWULHYRPDWLFSDFNHU
7LPH/RJ
6WDUW
7LPH
(QG
7LPH 'XUKU
&XP'XU
KU3KDVH 2SU $FW 3ODQ 2SHU'HVFU
:2 0 3 3-60±,QVWDOOHG)269RQGULOOSLSHSRVLWLRQ´7$0,QIODWDEOHWHVWSDFNHUZLWK&2(DW¶8: .': .
3XPS%%/RI33*.&/1D&OEULQHUDWH%30#SVLGURS´VHWWLQJEDOOGRZQGULOOSLSH7KHQSXPS
%%/RIEULQHVDPHUDWH%30#SVLVORZUDWHWRò%30#36,FRQWLQXHWRSXPS%%/6IRUDWRWDORI
%%/6FDOFXODWHG'3YROXPH
:2 0 3 3XPSHGDQDGGLWLRQDO%%/ZLWKYDULHGSXPSUDWHVIURPò%30WR%30ZRUNSLSH¶¶DQGZDVDEOHWRVHDWEDOODQG
SUHVVXUHGWR36,&RQILUPHGSRVLWLRQ&2(DW¶DQGZDLWHG+56IRUEULQHWHPSHUDWXUHWRKHDWXSWRIRUPDWLRQ
WHPSHUDWXUHSHU7$0UHS
:2 0 3 3UHVVXUHGXSRQGULOOSLSHWR36,WRLQIODWHDQGHQJDJHDQFKRUKHOGIRUPLQXWHV3LFNHGXS.RYHUXSZHLJKWWRYHULI\
DQFKRUVHW6ODFNRIIGULOOSLSHWRQHXWUDOZHLJKWFRQWLQXHWRSUHVVXUHXSWR36,DQGKROGIRUPLQXWHVEOHHGSUHVVXUH
WR36,DQGFORVH)269WRLVRODWH±EORZGRZQWRSGULYH
:2 0 3 )OXLGSDFNOLQHDQGWHVW´FDVLQJWR36,LQFUHDVLQJSUHVVXUHLQ36,LQFUHPHQWVZKLOHPRQLWRULQJ%DQQXOXV
SUHVVXUH7KH$DQQXOXVSUHVVXUHIHOO36,GXULQJWKHILUVWPLQXWHVRIWKHWHVWDQGIHOODQRWKHU36,GXULQJWKH
VHFRQGPLQXWHVRIWKHWHVW$WPLQXWHVLQWRWKHWHVWWKHSUHVVXUHIHOOWR36,RQWKH$DQQXOXV'XULQJWKLVWHVWWKH%
DQQXOXVSUHVVXUHLQFUHDVHGIURP36,WR36,ZKHQWKH$DQQXOXVSUHVVXUHIHOOWR36,WKH%DQQXOXVIHOOWR36,
DQGLQFUHDVHGWR36,LQPLQXWHV
:2 0 3 0DNHWRSGULYHSUHVVXUHGXSWR36,DERYHFORVHG)269DQGRSHQHG)269ZKLFKSUHVVXUHVORZO\IHOOWR36,
2SHQHGDQQXODUSUHYHQWHUDQGSLFNHGXS¶ZLWKQRRYHUSXOODQGVODFNHGRIIZLWKRXWVHHLQJDQ\ZHLJKWORVVFRQILUPLQJWKDW
WKHLQIODWDEOHSDFNHUZDVIUHH3XPSHGGRZQGULOOSLSHDW%30DW36,WRVKHDUSDFNHUFKRNHVKXWLQSXPSDQGGULOO
SLSHSUHVVXUHLPPHGLDWHO\IHOOWR36,
1RWHRQJRLQJLQYHVWLJDWLRQWRXQGHUVWDQGUHDVRQVIRU7$0SDFNHUUHOHDVHIDLOXUH´
:2 0 3 3XOORXWRIKROHZLWK´7$0,QIODWDEOHWHVWSDFNHUIURPWRVXUIDFHDQGOD\GRZQSDFNHUSHU7$0UHS3DVVHG
WKURXJK´6DOWHOFDVLQJSDWFKDW¶WR¶ZLWKRXWLQFLGHQW1RWH7KHORZHUDUHDRIDQFKRUVODWKDGH[WHUQDO
GDPDJHWRWKHHOHPHQWRI7$0,QIODWDEOHSDFNHU$GGLQJ%3+RI33*.&/1D&OELRFLGHWUHDWHGEULQHSOXVPHWDO
GLVSODFHPHQW
:2 & 3 3-60±SXOOZHDUEXVKLQJSHU9ROWUHSEORZGRZQSULPDU\DQGVHFRQGDU\FKRNHNLOOOLQHVDQGIOXVKRXWZLWKZDWHU,QVWDOOWHVW
SOXJRQWHVWMRLQWSHU9ROWUHS
:2 & 3 3-60±5LJXSWRWHVW%23PDNHXSIORRUYDOYHV'HOWD77IORRGOLQHVDQGIOXLGSDFN%23(3HUIRUPVKHOOWHVWWR
36,JRRGWHVW$GGLQJ%3+RI33*.&/1D&OELRFLGHWUHDWHGEULQH
:HOO1DPH63)125
:HOOERUH1DPH63)1
:HOO&RGH
-RE:25.29(5
:&(,/HYHO/(9(/
'DLO\5HSRUW
'DWH
5HSRUW
3DJHRI
7LPH/RJ
6WDUW
7LPH
(QG
7LPH 'XUKU
&XP'XU
KU3KDVH 2SU $FW 3ODQ 2SHU'HVFU
:2 & 3 7HVW%23WR$2*&&6XQGU\RI36,36,ZLWK$%WHVWVHTXHQFHPLQV3HUIRUPDFFXPXODWRUGUDZGRZQ
WHVWRQ´WXEXODUVWDUWLQJSUHVVXUH36,DIWHUIXQFWLRQ36,36,UHFRYHU\VHFRQGVIXOOUHFRYHU\
VHFRQGV%7/1DYHUDJH36,7HVWVHTXHQFHZLWK´WXEXODUDQQXODU7HVWSLWOHYHOVJDLQORVVDQGDOOJDV
DODUPV3XPS%3+RI33*.&/1D&OELRFLGHWUHDWHGEULQH
1RWHKUVORVV %%/67RWDOORVV %%/6RI.&/1D&OEULQH
1RWH%ULDQ%L[E\ZLWKWKH$2*&&ZLWQHVVWHVW
*DV5HDGLQJV
$YJ%DFNJURXQG*DV 0D[%DFNJURXQG*DV $YJ&RQQHFWLRQ*DV 0D[&RQQHFWLRQ*DV
$YJ'ULOO*DV 0D['ULOO*DV $YJ7ULS*DV 0D[7ULS*DV
'DLO\0XG9ROXPHV
7DQN$GGLWLRQ/RVV 7\SH 'HV 9ROXPHEEO
7DQN
+ROH
/RVV
&XPXODWLYH0XG9ROXPHV
$FWLYH9ROXPHEEO
+ROH9ROXPHEEO
$GGLWLRQVEEO
&XP$GGLWLRQVEEO
/RVVHVEEO
&XP/RVVHVEEO
'DLO\&RQWDFWV
3RVLWLRQ &RQWDFW1DPH &RPSDQ\ 7LWOH (PDLO 2IILFH 0RELOH
(QLUHSUHVHQWDWLYH 6WHYH/DZUHQFH $65&(QHUJ\6HUYLFHV 'ULOOLQJ6XSY VLGGULOOLQJ#HQLFRP
(QLUHSUHVHQWDWLYH 'DYLG6PLWK $65&(QHUJ\6HUYLFHV 'ULOOLQJ6XSYVLGGULOOLQJ#HQLFRP
(QLUHSUHVHQWDWLYH 0LWFK%LOOLQJWRQ $65&(QHUJ\6HUYLFHV 5LJ&OHUN $.5LJ&OHUNV'R\RQ#HQLFRP
(QLUHSUHVHQWDWLYH 0DUN+XEOHU %HDFRQ +6( PDUNKXEOHU#H[WHUQDOHQLFRP
7RRO3XVK 5\DQ3DQNUDW] 'R\RQ'ULOOLQJ 7RRO3XVKHU ULJ#GR\RQGULOOLQJFRP
7RRO3XVK (LQHU)OHDJOH 'R\RQ'ULOOLQJ 7RXU3XVKHU ULJ#GR\RQGULOOLQJFRP
6DIHW\5HSUHVHQWDWLYH +DUROG5LFKDUGVRQ 'R\RQ'ULOOLQJ +6( KULFKDUGVRQ#GR\RQGULOOLQJFRP
6DIHW\5HSUHVHQWDWLYH 'DYH6HQD 'R\RQ'ULOOLQJ +6( GVHQD#GR\RQGULOOLQJFRP
3HUVRQQHO/RJ32%
&RPSDQ\ 6HUY7\SH :RUN+KU 6WDQGE\+KU &RXQW 1RWH
6&+/80%(5*(5 &HPHQW
/LWWOH5HG6HUYLFHV 3XPSLQJ
$65&(QHUJ\6HUYLFHV 5LJFOHUN
$65&(QHUJ\6HUYLFHV 62$
$65&(QHUJ\6HUYLFHV /LIW$GYLVRU
%($&21 +6(
&203(7(17,$ )XHOHU
9HWFR :HOOKHDG
7HQDULV 7KUHDG5HS
7$0 3DFNHU5HS
$65&(QHUJ\6HUYLFHV &RPSDQ\PDQ
+$//,%85721 0XG/RJJHUV
6&+/80%(5*(5 6/%0,6ZDFR0XG(QJLQHHU
*%5 &DVLQJ6HUYLFH
%DNHU+XJKHV &RPSOHWLRQV
6&+/80%(5*(5 6/%0,6ZDFR0XGSODQW
6&+/80%(5*(5 6/%:,)
(;352 :HOO)ORZ
:25/(< 5LJ6XSSRUW
'2<21 2QVKRUH5LJ
%236WDFN &RPSRQHQWV
'HVFULSWLRQ
%236WDFN
6WDUW'DWH
/DVW&HUWLILFDWLRQ'DWH
3UHVVXUH5DWLQJSVL
7\SH 0DNH 0RGHO ,'1RPLQ 35DQJHSVL /DVW&HUW'DWH
$QQXODU +\GULO *.
;9%5
V +\GULO 03/
%OLQG6KHDU5DP +\GULO 03/
[9%5V +\GULO 03/
6ORZ&LUFXODWLRQ5DWHV
3XPS1XPEHU 0DNH0RGHO
6WDUW'DWH (QG'DWH /LQHU6L]HLQ 9ROXPH3HU6WURNH2YHUULGHEEOVWN 0D[3UHVVXUHSVL
'DWH 'HSWKIW.% 6ORZ6SG 6WURNHVVSP 3SVL (II 4)ORZJSP
'DLO\%XON
6XSSO\,WHP'HVFULSWLRQ(TXLSPHQW)XHO 8QLW/DEHO*DO 8QLW6L]H1RWH
'DWH
&RQVXPHG
5HFHLYHG
5HWXUQHG &XP&RQVXPHG
&XP5HFHLYHG
&XP5HWXUQHG
&XP2Q/RF
1RWH
6XSSO\,WHP'HVFULSWLRQ0XG3ODQW%RLOHUV 8QLW/DEHO*DO 8QLW6L]H 1RWH
'DWH
&RQVXPHG
5HFHLYHG
5HWXUQHG &XP&RQVXPHG
&XP5HFHLYHG
&XP5HWXUQHG
&XP2Q/RF
1RWH
6XSSO\,WHP'HVFULSWLRQ5LJ)XHO 8QLW/DEHOJDOXV 8QLW6L]H1RWH
'DWH
&RQVXPHG
5HFHLYHG
5HWXUQHG &XP&RQVXPHG
&XP5HFHLYHG
&XP5HWXUQHG
&XP2Q/RF
1RWH
6XSSO\,WHP'HVFULSWLRQ5LJ:DWHU 8QLW/DEHOEEO 8QLW6L]H1RWH
'DWH
&RQVXPHG
5HFHLYHG
5HWXUQHG &XP&RQVXPHG
&XP5HFHLYHG
&XP5HWXUQHG
&XP2Q/RF
1RWH
6XSSO\,WHP'HVFULSWLRQ:,)%RLOHUV 8QLW/DEHO*DO 8QLW6L]H 1RWH
'DWH
&RQVXPHG
5HFHLYHG
5HWXUQHG &XP&RQVXPHG
&XP5HFHLYHG
&XP5HWXUQHG
&XP2Q/RF
1RWH
/DVW$XWKRULW\9LVLW
'DWH
7RWLQVS1EU 7RWDO,1&QXPEHU &RPPHQW
$2*&&%ULDQ%L[E\:LWQHVV%237HVW
:HOO1DPH63)125
:HOOERUH1DPH63)1
:HOO&RGH
-RE:25.29(5
:&(,/HYHO/(9(/
'DLO\5HSRUW
'DWH
5HSRUW
3DJHRI
6723&DUGV6XEPLWWHG
&RPSDQ\ 5SWV &RP
'R\RQ'ULOOLQJ,QF 2EVHUYDWLRQV
'R\RQ'ULOOLQJ,QF3-60
V
'R\RQ'ULOOLQJ,QF 6WRS:RUN
'R\RQ'ULOOLQJ,QF +D]DUG,'
+DOOLEXUWRQ 2EVHUYDWLRQV
0,6ZDFR 6WRS:RUN
0,6ZDFR 2EVHUYDWLRQV
:RUOH\ 2EVHUYDWLRQV
:RUOH\ 6WRS:RUN
*HQHUDO1RWHV
&RPPHQW
:HOO1DPH63)125
:HOOERUH1DPH63)1
:HOO&RGH
-RE:25.29(5
:&(,/HYHO/(9(/
'DLO\5HSRUW
'DWH
5HSRUW
3DJHRI
:HOO+HDGHU
3HUPLW&RQFHVVLRQ1
$'/
2SHUDWRU
(1,3(752/(80
6XEVLGLDU\
(1,3HWUROHXP&R,QF
,QLWLDO/DKHH&RGH
'(9(/230(17:(//
5RWDU\7DEOH(OHYDWLRQIW
*URXQG/HYHOIW )LUVW)ODQJHIW
5.%%DVH)ODQJHIW
5.%7XELQJ6SRROIW
5LJV
5LJ1DPH
5,*
&RQWUDFWRU
'2<21
5LJ7\SH
/$1'5,*
5LJ1XP
5LJ6WDUW'DWH
5LJ5HOHDVH'DWH
'DLO\,QIRUPDWLRQ
:HDWKHU
&OHDU:&
7HPSHUDWXUH)
:LQG
1(#03+
'D\V/7,GD\V 'D\V5,GD\V 32%
6DIHW\,QFLGHQWV1HDU0LVV
'DWH
&DWHJRU\ 7\SH 6XEW\SH 6HYHULW\ &DXVH /RVWWLPH"
1R
&RPPHQW
=HUR+6(,QFLGHQWV5HYLHZHGWKH&
VZLWKDIRFXVRQ&RQWURORIZRUN5HYLHZHG(QL*ROGHQ5XOHVZLWKDIRFXVRQ'ULYLQJ6DIHW\
6DIHW\'ULOOV
7\SH 2FFXU /DVW'DWH 1H[W'DWH
'D\V8QWLO1H[W&KHFN
GD\V
$XWKRULW\9LVLW
%23'ULOO
%237HVWSUHVVXUH
)LUH'ULOO
.LFN:KLOH7ULSSLQJ
5LJ,QVSHFWLRQ
6DIHW\0HHWLQJ
6SLOO'ULOO
77%23'ULOO
77&DPS)LUH'ULOO
77+6'ULOO
77.LFN:KLOH7ULSSLQJ
770DQ'RZQ'ULOO
775LJ(YDF'ULOO
775LJ(YDFXDWLRQ'ULOO
775LJ)LUH'ULOO
&DVLQJVVHDW
&DV7\SH 2'LQ ,'LQ *UDGH 7RSIW.% %RWWRPIW.% 79'%RWIW.% /DQGLQJ'DWH
&21'8&725
&$6,1* /
&$6,1* /
/,1(5
/,1(5 /
/DVW&HPHQWLQJ
&HPHQWLQJ6WDUW'DWH6WULQJ/,1(5IW.%&RPPHQW;OLQHUKDQJHUSDFNHUVHWLQVLGHOLQHU72OLQHU#
EWPRIIORDWVKRH#
6WJ 7RSIW.% 7RS0HDV0HWK %WPIW.% &RP
6/%7HVWOLQHVWRSVL6/%SXPSEEOV0XG3XVKEEOVFHPHQWGURSZLSHUEDOOEEOV
0XG3XVKDQGULJGLVSODFHZEEOVVOLFNZDWHU6WLQJLQWROLQHUSDFNHUDQGVTXHH]HFHPHQWZEEOVRIVOLFN
ZDWHU&,3#KUV
-RE,QIRUPDWLRQ
-RE3KDVH
:25.29(5
3ODQQHG6WDUW'DWH
6WDUW'DWH
(QG'DWH 3'XUDWLRQGD\V
'DLO\6XPPDU\2SHUDWLRQV
K)RUHFDVW
/D\GRZQGULOOSLSH±5LJXSDQGUXQ(63FRPSOHWLRQSHUSURFHGXUH
K6XPPDU\
&RPSOHWH%23WHVW±7HVWFDVLQJSHUSURFHGXUH±/D\GRZQGULOOSLSH
2SHUDWLRQDW
3LFNLQJXS(63DVVHPEO\
7LPH/RJ
6WDUW
7LPH
(QG
7LPH 'XUKU
&XP'XU
KU3KDVH 2SU $FW 3ODQ 2SHU'HVFU
:2 & 3 &RQWLQXHWRWHVW%23(RQ´SLSH36,ORZDQG36,KLJKSHU$2*&&VXQGU\$GGLQJ%3+RI33*
.&/1D&OELRFLGHWUHDWHGEULQHWRDQQXOXV
:2 & 3 5LJGRZQ%23WHVWHTXLSPHQWUHPRYHWHVWSOXJDQGLQVWDOOZHDUEXVKLQJSHU9DXOWUHS
:2 0 3 3-600RELOL]H´%DNHU5HWULHYDPDWLFWHVWSDFNHUWRULJIORRUPDNHXSVDPHDQGWULSLQKROHWR¶$GGLQJ%3+
RI33*.&/1D&OELRFLGHWUHDWHGEULQH
:2 0 3 6HW%DNHU5HWULHYDPDWLFWHVWSDFNHUZLWK.GRZQZHLJKWDQG&2(DW¶3UHVVXUHWHVW´FDVLQJWR36,
VWDJLQJSUHVVXUHXSLQ36,LQFUHPHQWVZKLOHPRQLWRULQJSUHVVXUHRQ%DQQXOXV+HOGWHVWIRUPLQXWHVORVW36,LQ
WKHILUVWPLQXWHVRIWKHWHVWDQG36,LQWKHVHFRQGPLQXWHVRIWKHWHVWDQG36,LQWKHODVWPLQXWHVRIWKHWHVW
0D[SUHVVXUHVHHQRQ%DQQXOXVGXULQJWHVWZDV36,$DQG%DQQXOXVFKDUWUHFRUGHG
1RWH1ROHDNVDUHGHWHFWHGLQWKH´VHFWLRQDERYHFDVLQJSDWFKUHFRUGHGWXELQJOHDNVLQWHUYDO4XDOLILHGLQWHJULW\RI
´FDVLQJXVLQJILQJHUSULQWFDVLQJWHVWRI
:2 0 3 %OHHGSUHVVXUHRIIRIZHOODQGUHOHDVHWHVWSDFNHUEORZGRZQFKRNHDQGNLOOOLQHV3XOORXWRIKROHZLWKWHVWSDFNHUIURP¶
WRVXUIDFHDQGOD\GRZQVDPH$GGLQJ%3+RI33*.&/1D&OELRFLGHWUHDWHGEULQHSOXVSLSHGLVSODFHPHQW
:2 0 3 3-60&KDQJHHOHYDWRUVSUHSSLSHVKHGIRUOD\LQJGRZQSLSHLQVWDOOPRXVHKROHLQURWDU\WDEOHVWDJHWKUHDGSURWHFWRUV
/D\GRZQDOOGULOOSLSHVWDQGVIURPGHUULFN$GGLQJ%3+RI33*.&/1D&OELRFLGHWUHDWHGEULQHWR
DQQXOXV
1RWHKUVORVV %%/67RWDOORVV %%/6RI.&/1D&OEULQH
*DV5HDGLQJV
$YJ%DFNJURXQG*DV 0D[%DFNJURXQG*DV $YJ&RQQHFWLRQ*DV 0D[&RQQHFWLRQ*DV
$YJ'ULOO*DV 0D['ULOO*DV $YJ7ULS*DV 0D[7ULS*DV
'DLO\0XG9ROXPHV
7DQN$GGLWLRQ/RVV 7\SH 'HV 9ROXPHEEO
7DQN
+ROH
/RVV
:HOO1DPH63)125
:HOOERUH1DPH63)1
:HOO&RGH
-RE:25.29(5
:&(,/HYHO/(9(/
'DLO\5HSRUW
'DWH
5HSRUW
3DJHRI
&XPXODWLYH0XG9ROXPHV
$FWLYH9ROXPHEEO
+ROH9ROXPHEEO
$GGLWLRQVEEO
&XP$GGLWLRQVEEO
/RVVHVEEO
&XP/RVVHVEEO
'DLO\&RQWDFWV
3RVLWLRQ &RQWDFW1DPH &RPSDQ\ 7LWOH (PDLO 2IILFH 0RELOH
(QLUHSUHVHQWDWLYH 6WHYH/DZUHQFH $65&(QHUJ\6HUYLFHV 'ULOOLQJ6XSY VLGGULOOLQJ#HQLFRP
(QLUHSUHVHQWDWLYH 'DYLG6PLWK $65&(QHUJ\6HUYLFHV 'ULOOLQJ6XSYVLGGULOOLQJ#HQLFRP
(QLUHSUHVHQWDWLYH 0LWFK%LOOLQJWRQ $65&(QHUJ\6HUYLFHV 5LJ&OHUN $.5LJ&OHUNV'R\RQ#HQLFRP
(QLUHSUHVHQWDWLYH 0DUN+XEOHU %HDFRQ +6( PDUNKXEOHU#H[WHUQDOHQLFRP
7RRO3XVK 5\DQ3DQNUDW] 'R\RQ'ULOOLQJ 7RRO3XVKHU ULJ#GR\RQGULOOLQJFRP
7RRO3XVK (LQHU)OHDJOH 'R\RQ'ULOOLQJ 7RXU3XVKHU ULJ#GR\RQGULOOLQJFRP
6DIHW\5HSUHVHQWDWLYH +DUROG5LFKDUGVRQ 'R\RQ'ULOOLQJ +6( KULFKDUGVRQ#GR\RQGULOOLQJFRP
6DIHW\5HSUHVHQWDWLYH 'DYH6HQD 'R\RQ'ULOOLQJ +6( GVHQD#GR\RQGULOOLQJFRP
3HUVRQQHO/RJ32%
&RPSDQ\ 6HUY7\SH :RUN+KU 6WDQGE\+KU &RXQW 1RWH
6&+/80%(5*(5 &HPHQW
/LWWOH5HG6HUYLFHV 3XPSLQJ
$65&(QHUJ\6HUYLFHV 5LJFOHUN
$65&(QHUJ\6HUYLFHV 62$
$65&(QHUJ\6HUYLFHV /LIW$GYLVRU
%($&21 +6(
&203(7(17,$ )XHOHU
9HWFR :HOOKHDG
7HQDULV 7KUHDG5HS
7$0 3DFNHU5HS
$65&(QHUJ\6HUYLFHV &RPSDQ\PDQ
+$//,%85721 0XG/RJJHUV
6&+/80%(5*(5 6/%0,6ZDFR0XG(QJLQHHU
*%5 &DVLQJ6HUYLFH
%DNHU+XJKHV &RPSOHWLRQV
6&+/80%(5*(5 6/%0,6ZDFR0XGSODQW
6&+/80%(5*(5 6/%:,)
(;352 :HOO)ORZ
:25/(< 5LJ6XSSRUW
'2<21 2QVKRUH5LJ
%236WDFN &RPSRQHQWV
'HVFULSWLRQ
%236WDFN
6WDUW'DWH
/DVW&HUWLILFDWLRQ'DWH
3UHVVXUH5DWLQJSVL
7\SH 0DNH 0RGHO ,'1RPLQ 35DQJHSVL /DVW&HUW'DWH
$QQXODU +\GULO *.
;9%5
V +\GULO 03/
%OLQG6KHDU5DP +\GULO 03/
[9%5V +\GULO 03/
6ORZ&LUFXODWLRQ5DWHV
3XPS1XPEHU 0DNH0RGHO
6WDUW'DWH (QG'DWH /LQHU6L]HLQ 9ROXPH3HU6WURNH2YHUULGHEEOVWN 0D[3UHVVXUHSVL
'DWH 'HSWKIW.% 6ORZ6SG 6WURNHVVSP 3SVL (II 4)ORZJSP
'DLO\%XON
6XSSO\,WHP'HVFULSWLRQ(TXLSPHQW)XHO 8QLW/DEHO*DO 8QLW6L]H1RWH
'DWH
&RQVXPHG
5HFHLYHG
5HWXUQHG &XP&RQVXPHG
&XP5HFHLYHG
&XP5HWXUQHG
&XP2Q/RF
1RWH
6XSSO\,WHP'HVFULSWLRQ0XG3ODQW%RLOHUV 8QLW/DEHO*DO 8QLW6L]H 1RWH
'DWH
&RQVXPHG
5HFHLYHG
5HWXUQHG &XP&RQVXPHG
&XP5HFHLYHG
&XP5HWXUQHG
&XP2Q/RF
1RWH
6XSSO\,WHP'HVFULSWLRQ5LJ)XHO 8QLW/DEHOJDOXV 8QLW6L]H1RWH
'DWH
&RQVXPHG
5HFHLYHG
5HWXUQHG &XP&RQVXPHG
&XP5HFHLYHG
&XP5HWXUQHG
&XP2Q/RF
1RWH
6XSSO\,WHP'HVFULSWLRQ5LJ:DWHU 8QLW/DEHOEEO 8QLW6L]H1RWH
'DWH
&RQVXPHG
5HFHLYHG
5HWXUQHG &XP&RQVXPHG
&XP5HFHLYHG
&XP5HWXUQHG
&XP2Q/RF
1RWH
6XSSO\,WHP'HVFULSWLRQ:,)%RLOHUV 8QLW/DEHO*DO 8QLW6L]H 1RWH
'DWH
&RQVXPHG
5HFHLYHG
5HWXUQHG &XP&RQVXPHG
&XP5HFHLYHG
&XP5HWXUQHG
&XP2Q/RF
1RWH
/DVW$XWKRULW\9LVLW
'DWH
7RWLQVS1EU 7RWDO,1&QXPEHU &RPPHQW
$2*&&%ULDQ%L[E\:LWQHVV%237HVW
6723&DUGV6XEPLWWHG
&RPSDQ\ 5SWV &RP
$&6 2EVHUYDWLRQV
'R\RQ'ULOOLQJ,QF +D]DUG,'
'R\RQ'ULOOLQJ,QF3-60
V
([SUR 2EVHUYDWLRQV
0,6ZDFR 2EVHUYDWLRQV
:RUOH\ 2EVHUYDWLRQV
*HQHUDO1RWHV
&RPPHQW
:HOO1DPH63)125
:HOOERUH1DPH63)1
:HOO&RGH
-RE:25.29(5
:&(,/HYHO/(9(/
'DLO\5HSRUW
'DWH
5HSRUW
3DJHRI
:HOO+HDGHU
3HUPLW&RQFHVVLRQ1
$'/
2SHUDWRU
(1,3(752/(80
6XEVLGLDU\
(1,3HWUROHXP&R,QF
,QLWLDO/DKHH&RGH
'(9(/230(17:(//
5RWDU\7DEOH(OHYDWLRQIW
*URXQG/HYHOIW )LUVW)ODQJHIW
5.%%DVH)ODQJHIW
5.%7XELQJ6SRROIW
5LJV
5LJ1DPH
5,*
&RQWUDFWRU
'2<21
5LJ7\SH
/$1'5,*
5LJ1XP
5LJ6WDUW'DWH
5LJ5HOHDVH'DWH
'DLO\,QIRUPDWLRQ
:HDWKHU
2YHUFDVW:&
7HPSHUDWXUH)
:LQG
6:#03+
'D\V/7,GD\V 'D\V5,GD\V 32%
6DIHW\,QFLGHQWV1HDU0LVV
'DWH
&DWHJRU\ 7\SH 6XEW\SH 6HYHULW\ &DXVH /RVWWLPH"
1R
&RPPHQW
=HUR+6(,QFLGHQWV5HYLHZHGWKH&
VZLWKDIRFXVRQ&RPSHWHQF\5HYLHZHG(QL*ROGHQ5XOHVZLWKDIRFXVRQ:DVWHPDQDJHPHQW
6DIHW\'ULOOV
7\SH 2FFXU /DVW'DWH 1H[W'DWH
'D\V8QWLO1H[W&KHFN
GD\V
$XWKRULW\9LVLW
%23'ULOO
%237HVWSUHVVXUH
)LUH'ULOO
.LFN:KLOH7ULSSLQJ
5LJ,QVSHFWLRQ
6DIHW\0HHWLQJ
6SLOO'ULOO
77%23'ULOO
77&DPS)LUH'ULOO
77+6'ULOO
77.LFN:KLOH7ULSSLQJ
770DQ'RZQ'ULOO
775LJ(YDF'ULOO
775LJ(YDFXDWLRQ'ULOO
775LJ)LUH'ULOO
776WULSSLQJ'ULOO
&DVLQJVVHDW
&DV7\SH 2'LQ ,'LQ *UDGH 7RSIW.% %RWWRPIW.% 79'%RWIW.% /DQGLQJ'DWH
&21'8&725
&$6,1* /
&$6,1* /
/,1(5
/,1(5 /
/DVW&HPHQWLQJ
&HPHQWLQJ6WDUW'DWH6WULQJ/,1(5IW.%&RPPHQW;OLQHUKDQJHUSDFNHUVHWLQVLGHOLQHU72OLQHU#
EWPRIIORDWVKRH#
6WJ 7RSIW.% 7RS0HDV0HWK %WPIW.% &RP
6/%7HVWOLQHVWRSVL6/%SXPSEEOV0XG3XVKEEOVFHPHQWGURSZLSHUEDOOEEOV
0XG3XVKDQGULJGLVSODFHZEEOVVOLFNZDWHU6WLQJLQWROLQHUSDFNHUDQGVTXHH]HFHPHQWZEEOVRIVOLFN
ZDWHU&,3#KUV
-RE,QIRUPDWLRQ
-RE3KDVH
:25.29(5
3ODQQHG6WDUW'DWH
6WDUW'DWH
(QG'DWH 3'XUDWLRQGD\V
'DLO\6XPPDU\2SHUDWLRQV
K)RUHFDVW
&RQWLQXHUXQQLQJ(63FRPSOHWLRQSHUSURFHGXUH
K6XPPDU\
&RPSOHWHGSLSH/'±3LFNXS(63DVVHPEO\DQGUXQSHUSURFHGXUH
2SHUDWLRQDW
5XQQLQJLQKROHZLWK(63FRPSOHWLRQVWULQJDW
0'
7LPH/RJ
6WDUW
7LPH
(QG
7LPH 'XUKU
&XP'XU
KU3KDVH 2SU $FW 3ODQ 2SHU'HVFU
:2 0 3 3-60&RQWLQXHGWROD\GRZQ´77GULOOSLSHIURPGHUULFNXVLQJPRXVHKROH$GGLQJ%3+RI33*.&/1D&O
ELRFLGHWUHDWHGEULQHLQDQQXOXV
:2 0 3 /D\GRZQPRXVHKROHIURPURWDU\WDEOH5HPRYHZHDUEXVKLQJSHU9DXOWUHS,QVWDOO;2RQ)269IRU´+\G
WXELQJ&KDQJHHOHYDWRUVFOHDQDQGFOHDUULJIORRU$GGLQJ%3+RI33*.&/1D&OELRFLGHWUHDWHGEULQH
:2 . 3 3-600RELOL]H%DNHU&HQWULOLIWHTXLSPHQWWRULJIORRUDQGULJXS*%5SRZHUWRQJV6WULQJURSHRYHU(63VKHDYHLQGHUULFN
SXOO(63FDEOHDQG´FDSLOODU\OLQHVRYHUVKHDYHVWRWKHULJIORRUIURPVSRROLQJXQLWDQGVHFXUHG$GGLQJ%3+RI
33*.&/1D&OELRFLGHWUHDWHGEULQH
:2 . 3 3-600DNHXS´VKURXG3LFNXSPDNHXS(63PRWRUDQGVHDOVILOOLQJZLWKRLO0DNHXSLQWDNHDQGJDVVHSDUDWRU
DORQJZLWKWZR(63SXPSVHFWLRQVHQVXUHIUHHURWDWLRQRIDOOHTXLSPHQW$GGLQJ%3+RI33*.&/1D&OELRFLGH
WUHDWHGEULQH
:2 . 3 3XOOXSWR´FHQWUDOL]HUIURPVKURXGDQGLQVWDOOFKHFNYDOYHDQG´FDSLOODU\OLQHWRFHQWUDOL]HULQVWDOOHG7(&OLQHIRU
0*8FRPHGRZQDQGLQVWDOO0/(LQWRPRWRUSRWKHDG5XQPRWRUDVVHPEO\DQG´OLQHVLQVKURXGLQVWDOOLQJUHTXLUHG
FODPSVLQVWDOOVKURXGKDQJHUDQGPDNHXSVDPH&RQWLQXHLQKROHLQVWDOOLQJGLVFKDUJHKHDG'*8DVVHPEO\3HUIRUPHG
0*8DQG'*8FRPPXQLFDWLRQWHVWWKURXJK0/(JRRGWHVW$GGLQJ%3+RI33*.&/1D&OELRFLGHWUHDWHG
EULQH :2 . 3 0DNHXSMRLQWPDNHFDSLOODU\OLQHVSOLFHIURPó´WR´WXELQJ0DNH0/(WR(63FDEOHVSOLFH1RWH6SOLFHZLWQHVVHGE\
(1,HOHFWULFLDQ7\OHU'LD]3HUIRUPHGHOHFWULFDOFKHFNVDOOJRRG3UHVVXUHGXSFDSLOODU\OLQHWR36,PRQLWRUHG
SUHVVXUHRQGDWDORJJHUIRUPLQXWHV3UHVVXUHGWR36,DQGVHHQFKHFNYDOYHRSHQFRQWLQXHWRSXPSWKURXJKFKHFN
IRUPLQXWHV6KXWLQDQGPRQLWRUHGSUHVVXUHFKHFNYDOYHFORVLQJDW36,%OHGSUHVVXUHWR36,DQGPRQLWRUHG
SUHVVXUHRQGDWDORJJHU6SOLFHFODPS¶XSRQMRLQW&RQWLQXHDGGLQJ%3+RI33*.&/1D&OELRFLGHWUHDWHG
EULQH :2 . 3 3-605,+ZLWK(63FRPSOHWLRQRQ´/+<'7.;7LQWHUQDOFRDWLQJWXELQJI¶W¶*%5WRUTXH
WXUQDOOFRQQHFWLRQZLWQHVVE\7HQDULVUHS%DNHUSHUIRUPHGFRQWLQXLW\DQGUHDGLQJRQ¶LQWHUYDOVDQGPRQLWRUFDSOLQHV
ZLWK36,,QVWDOOFURVVFRXSOLQJFODPSVRQDOOFRQQHFWLRQ':ZW .$GGLQJ%3+RI33*.&/1D&O
ELRFLGHWUHDWHGEULQH
:2 . 3 3HUIRUPFRQWLQXLW\JDXJHUHDGLQJDQGFDSLOODU\OLQHSUHVVXUH3XPSWXELQJYROXPHRI%%/6ZLWKDUDWHRI%30#
36,RI33*.&/1D&OELRFLGHWUHDWHGEULQH':ZW .
1RWHKUVORVV %%/67RWDOORVV %%/6RI.&/1D&OEULQH
:HOO1DPH63)125
:HOOERUH1DPH63)1
:HOO&RGH
-RE:25.29(5
:&(,/HYHO/(9(/
'DLO\5HSRUW
'DWH
5HSRUW
3DJHRI
*DV5HDGLQJV
$YJ%DFNJURXQG*DV 0D[%DFNJURXQG*DV $YJ&RQQHFWLRQ*DV 0D[&RQQHFWLRQ*DV
$YJ'ULOO*DV 0D['ULOO*DV $YJ7ULS*DV 0D[7ULS*DV
'DLO\0XG9ROXPHV
7DQN$GGLWLRQ/RVV 7\SH 'HV 9ROXPHEEO
7DQN
+ROH
/RVV
&XPXODWLYH0XG9ROXPHV
$FWLYH9ROXPHEEO
+ROH9ROXPHEEO
$GGLWLRQVEEO
&XP$GGLWLRQVEEO
/RVVHVEEO
&XP/RVVHVEEO
'DLO\&RQWDFWV
3RVLWLRQ &RQWDFW1DPH &RPSDQ\ 7LWOH (PDLO 2IILFH 0RELOH
(QLUHSUHVHQWDWLYH 6WHYH/DZUHQFH $65&(QHUJ\6HUYLFHV 'ULOOLQJ6XSY VLGGULOOLQJ#HQLFRP
(QLUHSUHVHQWDWLYH 'DYLG6PLWK $65&(QHUJ\6HUYLFHV 'ULOOLQJ6XSYVLGGULOOLQJ#HQLFRP
(QLUHSUHVHQWDWLYH 0LWFK%LOOLQJWRQ $65&(QHUJ\6HUYLFHV 5LJ&OHUN $.5LJ&OHUNV'R\RQ#HQLFRP
(QLUHSUHVHQWDWLYH 0DUN+XEOHU %HDFRQ +6( PDUNKXEOHU#H[WHUQDOHQLFRP
7RRO3XVK 5\DQ3DQNUDW] 'R\RQ'ULOOLQJ 7RRO3XVKHU ULJ#GR\RQGULOOLQJFRP
7RRO3XVK 7HG.UXJHU 'R\RQ'ULOOLQJ 7RXU3XVKHU ULJ#GR\RQGULOOLQJFRP
6DIHW\5HSUHVHQWDWLYH +DUROG5LFKDUGVRQ 'R\RQ'ULOOLQJ +6( KULFKDUGVRQ#GR\RQGULOOLQJFRP
6DIHW\5HSUHVHQWDWLYH 'DYH6HQD 'R\RQ'ULOOLQJ +6( GVHQD#GR\RQGULOOLQJFRP
3HUVRQQHO/RJ32%
&RPSDQ\ 6HUY7\SH :RUN+KU 6WDQGE\+KU &RXQW 1RWH
6&+/80%(5*(5 &HPHQW
/LWWOH5HG6HUYLFHV 3XPSLQJ
$65&(QHUJ\6HUYLFHV 5LJFOHUN
$65&(QHUJ\6HUYLFHV 62$
$65&(QHUJ\6HUYLFHV /LIW$GYLVRU
&203(7(17,$ )XHOHU
9HWFR :HOOKHDG
7HQDULV 7KUHDG5HS
7$0 3DFNHU5HS
$65&(QHUJ\6HUYLFHV &RPSDQ\PDQ
%($&21 +6(
+$//,%85721 0XG/RJJHUV
6&+/80%(5*(5 6/%0,6ZDFR0XG(QJLQHHU
*%5 &DVLQJ6HUYLFH
(;352 :HOO)ORZ
%DNHU+XJKHV &RPSOHWLRQV
6&+/80%(5*(5 6/%0,6ZDFR0XGSODQW
6&+/80%(5*(5 6/%:,)
:25/(< 5LJ6XSSRUW
'2<21 2QVKRUH5LJ
%236WDFN &RPSRQHQWV
'HVFULSWLRQ
%236WDFN
6WDUW'DWH
/DVW&HUWLILFDWLRQ'DWH
3UHVVXUH5DWLQJSVL
7\SH 0DNH 0RGHO ,'1RPLQ 35DQJHSVL /DVW&HUW'DWH
$QQXODU +\GULO *.
;9%5
V +\GULO 03/
%OLQG6KHDU5DP +\GULO 03/
[9%5V +\GULO 03/
6ORZ&LUFXODWLRQ5DWHV
3XPS1XPEHU 0DNH0RGHO
6WDUW'DWH (QG'DWH /LQHU6L]HLQ 9ROXPH3HU6WURNH2YHUULGHEEOVWN 0D[3UHVVXUHSVL
'DWH 'HSWKIW.% 6ORZ6SG 6WURNHVVSP 3SVL (II 4)ORZJSP
'DLO\%XON
6XSSO\,WHP'HVFULSWLRQ(TXLSPHQW)XHO 8QLW/DEHO*DO 8QLW6L]H1RWH
'DWH
&RQVXPHG
5HFHLYHG
5HWXUQHG &XP&RQVXPHG
&XP5HFHLYHG
&XP5HWXUQHG
&XP2Q/RF
1RWH
6XSSO\,WHP'HVFULSWLRQ0XG3ODQW%RLOHUV 8QLW/DEHO*DO 8QLW6L]H 1RWH
'DWH
&RQVXPHG
5HFHLYHG
5HWXUQHG &XP&RQVXPHG
&XP5HFHLYHG
&XP5HWXUQHG
&XP2Q/RF
1RWH
6XSSO\,WHP'HVFULSWLRQ5LJ)XHO 8QLW/DEHOJDOXV 8QLW6L]H1RWH
'DWH
&RQVXPHG
5HFHLYHG
5HWXUQHG &XP&RQVXPHG
&XP5HFHLYHG
&XP5HWXUQHG
&XP2Q/RF
1RWH
6XSSO\,WHP'HVFULSWLRQ5LJ:DWHU 8QLW/DEHOEEO 8QLW6L]H1RWH
'DWH
&RQVXPHG
5HFHLYHG
5HWXUQHG &XP&RQVXPHG
&XP5HFHLYHG
&XP5HWXUQHG
&XP2Q/RF
1RWH
6XSSO\,WHP'HVFULSWLRQ:,)%RLOHUV 8QLW/DEHO*DO 8QLW6L]H 1RWH
'DWH
&RQVXPHG
5HFHLYHG
5HWXUQHG &XP&RQVXPHG
&XP5HFHLYHG
&XP5HWXUQHG
&XP2Q/RF
1RWH
/DVW$XWKRULW\9LVLW
'DWH
7RWLQVS1EU 7RWDO,1&QXPEHU &RPPHQW
$2*&&%ULDQ%L[E\:LWQHVV%237HVW
6723&DUGV6XEPLWWHG
&RPSDQ\ 5SWV &RP
'R\RQ'ULOOLQJ,QF 2EVHUYDWLRQ
'R\RQ'ULOOLQJ,QF3-60
V
'R\RQ'ULOOLQJ,QF +D]DUG,'
'R\RQ'ULOOLQJ,QF 6WRS:RUN
+DOOLEXUWRQ 2EVHUYDWLRQV
0,6ZDFR 2EVHUYDWLRQV
0,6ZDFR 0HQWRULQJ
:HOO1DPH63)125
:HOOERUH1DPH63)1
:HOO&RGH
-RE:25.29(5
:&(,/HYHO/(9(/
'DLO\5HSRUW
'DWH
5HSRUW
3DJHRI
6723&DUGV6XEPLWWHG
&RPSDQ\ 5SWV &RP
:RUOH\ 2EVHUYDWLRQV
*HQHUDO1RWHV
&RPPHQW
:HOO1DPH63)125
:HOOERUH1DPH63)1
:HOO&RGH
-RE:25.29(5
:&(,/HYHO/(9(/
'DLO\5HSRUW
'DWH
5HSRUW
3DJHRI
:HOO+HDGHU
3HUPLW&RQFHVVLRQ1
$'/
2SHUDWRU
(1,3(752/(80
6XEVLGLDU\
(1,3HWUROHXP&R,QF
,QLWLDO/DKHH&RGH
'(9(/230(17:(//
5RWDU\7DEOH(OHYDWLRQIW
*URXQG/HYHOIW )LUVW)ODQJHIW
5.%%DVH)ODQJHIW
5.%7XELQJ6SRROIW
5LJV
5LJ1DPH
5,*
&RQWUDFWRU
'2<21
5LJ7\SH
/$1'5,*
5LJ1XP
5LJ6WDUW'DWH
5LJ5HOHDVH'DWH
'DLO\,QIRUPDWLRQ
:HDWKHU
2YHUFDVW:&
7HPSHUDWXUH)
:LQG
6:#03+
'D\V/7,GD\V 'D\V5,GD\V 32%
6DIHW\,QFLGHQWV1HDU0LVV
'DWH
&DWHJRU\ 7\SH 6XEW\SH 6HYHULW\ &DXVH /RVWWLPH"
1R
&RPPHQW
=HUR+6(,QFLGHQWV5HYLHZHGWKH&
VZLWKDIRFXVRQ&RPSODFHQF\5HYLHZHG(QL*ROGHQ5XOHVZLWKDIRFXVRQ+HDOWK0DQDJHPHQW
6DIHW\'ULOOV
7\SH 2FFXU /DVW'DWH 1H[W'DWH
'D\V8QWLO1H[W&KHFN
GD\V
$XWKRULW\9LVLW
%23'ULOO
%237HVWSUHVVXUH
)LUH'ULOO
.LFN:KLOH7ULSSLQJ
5LJ,QVSHFWLRQ
6DIHW\0HHWLQJ
6SLOO'ULOO
77%23'ULOO
77&DPS)LUH'ULOO
77+6'ULOO
77.LFN:KLOH7ULSSLQJ
770DQ'RZQ'ULOO
775LJ(YDF'ULOO
775LJ(YDFXDWLRQ'ULOO
775LJ)LUH'ULOO
776WULSSLQJ'ULOO
&DVLQJVVHDW
&DV7\SH 2'LQ ,'LQ *UDGH 7RSIW.% %RWWRPIW.% 79'%RWIW.% /DQGLQJ'DWH
&21'8&725
&$6,1* /
&$6,1* /
/,1(5
/,1(5 /
/DVW&HPHQWLQJ
&HPHQWLQJ6WDUW'DWH6WULQJ/,1(5IW.%&RPPHQW;OLQHUKDQJHUSDFNHUVHWLQVLGHOLQHU72OLQHU#
EWPRIIORDWVKRH#
6WJ 7RSIW.% 7RS0HDV0HWK %WPIW.% &RP
6/%7HVWOLQHVWRSVL6/%SXPSEEOV0XG3XVKEEOVFHPHQWGURSZLSHUEDOOEEOV
0XG3XVKDQGULJGLVSODFHZEEOVVOLFNZDWHU6WLQJLQWROLQHUSDFNHUDQGVTXHH]HFHPHQWZEEOVRIVOLFN
ZDWHU&,3#KUV
-RE,QIRUPDWLRQ
-RE3KDVH
:25.29(5
3ODQQHG6WDUW'DWH
6WDUW'DWH
(QG'DWH 3'XUDWLRQGD\V
'DLO\6XPPDU\2SHUDWLRQV
K)RUHFDVW
5XQDQGODQG(63FRPSOHWLRQ1LSSOHGRZQ%23DQGLQVWDOOWUHH
K6XPPDU\
5XQ(63FRPSOHWLRQSHUSURFHGXUH
2SHUDWLRQDW
5XQQLQJLQKROHZLWK(63FRPSOHWLRQVWULQJDW
0'
7LPH/RJ
6WDUW
7LPH
(QG
7LPH 'XUKU
&XP'XU
KU3KDVH 2SU $FW 3ODQ 2SHU'HVFU
:2 . 3 3-60±5XQLQKROHZLWK(63FRPSOHWLRQRQ´/+<'7.;7LQWHUQDOFRDWLQJWXELQJIURP¶WR
¶*%5WRUTXHWXUQDOOFRQQHFWLRQZLWQHVVE\7HQDULVUHS%DNHUSHUIRUPHGHOHFWULFDOFRQWLQXLW\FKHFNVLQ¶
LQWHUYDOVZKLOHPDLQWDLQLQJFDSLOODU\OLQHSUHVVXUHDW36,,QVWDOOFURVVFRXSOLQJFODPSVRQDOOFRQQHFWLRQ': .
$GGLQJ%3+RI33*.&/1D&OELRFLGHWUHDWHGEULQH
:2 . 3 3XPSDWXELQJYROXPHRI33*.&/1D&OELRFLGHWUHDWHGEULQH%%/UDWH%30#36,ZKLOHFKDQJLQJ
RXW(63UHHOLQVSRROLQJXQLW
:2 . 3 3HUIRUP(63FDEOHVSOLFHDQGFRQGXFWHOHFWULFDOFKHFNVRQFDEOHSUHDQGSRVWVSOLFH1RWH(1,HOHFWULFLDQ7\OHU'LD]ZLWQHVV
WKHVSOLFHDQGWHVWLQJ$GGLQJ%3+RI33*.&/1D&OELRFLGHWUHDWHGEULQH
:2 . 3 3-605XQLQKROHZLWK(63FRPSOHWLRQRQ´/+<'7.;7LQWHUQDOFRDWLQJWXELQJIURP¶WR
¶/DLGGRZQMRLQWDQGLQVWDOOHG¶SXSMRLQWWRNHHSVSOLFHIURPODQGLQJDFURVVDFRXSOLQJ$OOFRQQHFWLRQVZHUH
LQVSHFWHGE\7HQDULVUHSDQGVHDOULQJVUHSODFHGDVQHHGHG*%5WRUTXHWXUQDOOFRQQHFWLRQZLWQHVVE\7HQDULVUHS%DNHU
SHUIRUPHGHOHFWULFDOFRQWLQXLW\FKHFNVLQ¶LQWHUYDOVZKLOHPDLQWDLQLQJFDSLOODU\OLQHSUHVVXUHDW36,,QVWDOOFURVV
FRXSOLQJFODPSVRQDOOFRQQHFWLRQ8: .':.$GGLQJ%3+RI33*.&/1D&OELRFLGHWUHDWHGEULQH
1RWHKUVORVV %%/67RWDOORVV %%/6RI.&/1D&OEULQH
*DV5HDGLQJV
$YJ%DFNJURXQG*DV 0D[%DFNJURXQG*DV $YJ&RQQHFWLRQ*DV 0D[&RQQHFWLRQ*DV
$YJ'ULOO*DV 0D['ULOO*DV $YJ7ULS*DV 0D[7ULS*DV
'DLO\0XG9ROXPHV
7DQN$GGLWLRQ/RVV 7\SH 'HV 9ROXPHEEO
7DQN
+ROH
/RVV
&XPXODWLYH0XG9ROXPHV
$FWLYH9ROXPHEEO
+ROH9ROXPHEEO
$GGLWLRQVEEO
&XP$GGLWLRQVEEO
/RVVHVEEO
&XP/RVVHVEEO
:HOO1DPH63)125
:HOOERUH1DPH63)1
:HOO&RGH
-RE:25.29(5
:&(,/HYHO/(9(/
'DLO\5HSRUW
'DWH
5HSRUW
3DJHRI
'DLO\&RQWDFWV
3RVLWLRQ &RQWDFW1DPH &RPSDQ\ 7LWOH (PDLO 2IILFH 0RELOH
(QLUHSUHVHQWDWLYH 6WHYH/DZUHQFH $65&(QHUJ\6HUYLFHV 'ULOOLQJ6XSY VLGGULOOLQJ#HQLFRP
(QLUHSUHVHQWDWLYH 'DYLG6PLWK $65&(QHUJ\6HUYLFHV 'ULOOLQJ6XSYVLGGULOOLQJ#HQLFRP
(QLUHSUHVHQWDWLYH 0LWFK%LOOLQJWRQ $65&(QHUJ\6HUYLFHV 5LJ&OHUN $.5LJ&OHUNV'R\RQ#HQLFRP
(QLUHSUHVHQWDWLYH 0DUN+XEOHU %HDFRQ +6( PDUNKXEOHU#H[WHUQDOHQLFRP
7RRO3XVK 5\DQ3DQNUDW] 'R\RQ'ULOOLQJ 7RRO3XVKHU ULJ#GR\RQGULOOLQJFRP
7RRO3XVK 7HG.UXJHU 'R\RQ'ULOOLQJ 7RXU3XVKHU ULJ#GR\RQGULOOLQJFRP
6DIHW\5HSUHVHQWDWLYH +DUROG5LFKDUGVRQ 'R\RQ'ULOOLQJ +6( KULFKDUGVRQ#GR\RQGULOOLQJFRP
6DIHW\5HSUHVHQWDWLYH 6KDXQ7RZHU 'R\RQ'ULOOLQJ +6( VWRZHU#GR\RQGULOOLQJFRP
3HUVRQQHO/RJ32%
&RPSDQ\ 6HUY7\SH :RUN+KU 6WDQGE\+KU &RXQW 1RWH
6&+/80%(5*(5 &HPHQW
$65&(QHUJ\6HUYLFHV 5LJFOHUN
$65&(QHUJ\6HUYLFHV 62$
$65&(QHUJ\6HUYLFHV /LIW$GYLVRU
%($&21 +6(
&203(7(17,$ )XHOHU
9HWFR :HOOKHDG
7HQDULV 7KUHDG5HS
$65&(QHUJ\6HUYLFHV &RPSDQ\PDQ
+$//,%85721 0XG/RJJHUV
6&+/80%(5*(5 6/%0,6ZDFR0XG(QJLQHHU
(;352 :HOO)ORZ
*%5 &DVLQJ6HUYLFH
%DNHU+XJKHV &RPSOHWLRQV
6&+/80%(5*(5 6/%0,6ZDFR0XGSODQW
6&+/80%(5*(5 6/%:,)
:25/(< 5LJ6XSSRUW
'2<21 2QVKRUH5LJ
%236WDFN &RPSRQHQWV
'HVFULSWLRQ
%236WDFN
6WDUW'DWH
/DVW&HUWLILFDWLRQ'DWH
3UHVVXUH5DWLQJSVL
7\SH 0DNH 0RGHO ,'1RPLQ 35DQJHSVL /DVW&HUW'DWH
$QQXODU +\GULO *.
;9%5
V +\GULO 03/
%OLQG6KHDU5DP +\GULO 03/
[9%5V +\GULO 03/
6ORZ&LUFXODWLRQ5DWHV
3XPS1XPEHU 0DNH0RGHO
6WDUW'DWH (QG'DWH /LQHU6L]HLQ 9ROXPH3HU6WURNH2YHUULGHEEOVWN 0D[3UHVVXUHSVL
'DWH 'HSWKIW.% 6ORZ6SG 6WURNHVVSP 3SVL (II 4)ORZJSP
'DLO\%XON
6XSSO\,WHP'HVFULSWLRQ(TXLSPHQW)XHO 8QLW/DEHO*DO 8QLW6L]H1RWH
'DWH
&RQVXPHG
5HFHLYHG
5HWXUQHG &XP&RQVXPHG
&XP5HFHLYHG
&XP5HWXUQHG
&XP2Q/RF
1RWH
6XSSO\,WHP'HVFULSWLRQ0XG3ODQW%RLOHUV 8QLW/DEHO*DO 8QLW6L]H 1RWH
'DWH
&RQVXPHG
5HFHLYHG
5HWXUQHG &XP&RQVXPHG
&XP5HFHLYHG
&XP5HWXUQHG
&XP2Q/RF
1RWH
6XSSO\,WHP'HVFULSWLRQ5LJ)XHO 8QLW/DEHOJDOXV 8QLW6L]H1RWH
'DWH
&RQVXPHG
5HFHLYHG
5HWXUQHG &XP&RQVXPHG
&XP5HFHLYHG
&XP5HWXUQHG
&XP2Q/RF
1RWH
6XSSO\,WHP'HVFULSWLRQ5LJ:DWHU 8QLW/DEHOEEO 8QLW6L]H1RWH
'DWH
&RQVXPHG
5HFHLYHG
5HWXUQHG &XP&RQVXPHG
&XP5HFHLYHG
&XP5HWXUQHG
&XP2Q/RF
1RWH
6XSSO\,WHP'HVFULSWLRQ:,)%RLOHUV 8QLW/DEHO*DO 8QLW6L]H 1RWH
'DWH
&RQVXPHG
5HFHLYHG
5HWXUQHG &XP&RQVXPHG
&XP5HFHLYHG
&XP5HWXUQHG
&XP2Q/RF
1RWH
/DVW$XWKRULW\9LVLW
'DWH
7RWLQVS1EU 7RWDO,1&QXPEHU &RPPHQW
$2*&&%ULDQ%L[E\:LWQHVV%237HVW
6723&DUGV6XEPLWWHG
&RPSDQ\ 5SWV &RP
'R\RQ'ULOOLQJ,QF +D]DUG,'
'R\RQ'ULOOLQJ,QF 3-60
V
'R\RQ'ULOOLQJ,QF 2EVHUYDWLRQ
'R\RQ'ULOOLQJ,QF 6WRS:RUN
0,6ZDFR 2EVHUYDWLRQV
0,6ZDFR 6WRS:RUN
:RUOH\ 6WRS:RUN
:RUOH\ 2EVHUYDWLRQV
:RUOH\ +D]DUG,'
*HQHUDO1RWHV
&RPPHQW
:HOO1DPH63)125
:HOOERUH1DPH63)1
:HOO&RGH
-RE:25.29(5
:&(,/HYHO/(9(/
'DLO\5HSRUW
'DWH
5HSRUW
3DJHRI
:HOO+HDGHU
3HUPLW&RQFHVVLRQ1
$'/
2SHUDWRU
(1,3(752/(80
6XEVLGLDU\
(1,3HWUROHXP&R,QF
,QLWLDO/DKHH&RGH
'(9(/230(17:(//
5RWDU\7DEOH(OHYDWLRQIW
*URXQG/HYHOIW )LUVW)ODQJHIW
5.%%DVH)ODQJHIW
5.%7XELQJ6SRROIW
5LJV
5LJ1DPH
5,*
&RQWUDFWRU
'2<21
5LJ7\SH
/$1'5,*
5LJ1XP
5LJ6WDUW'DWH
5LJ5HOHDVH'DWH
'DLO\,QIRUPDWLRQ
:HDWKHU
&OHDU:&
7HPSHUDWXUH)
:LQG
6:#03+
'D\V/7,GD\V 'D\V5,GD\V 32%
6DIHW\,QFLGHQWV1HDU0LVV
'DWH
&DWHJRU\ 7\SH 6XEW\SH 6HYHULW\ &DXVH /RVWWLPH"
1R
&RPPHQW
=HUR+6(,QFLGHQWV5HYLHZHGWKH&
VZLWKDIRFXVRQ&XOWXUH5HYLHZHG(QL*ROGHQ5XOHVZLWKDIRFXVRQ/LIWLQJ2SHUDWLRQV
6DIHW\'ULOOV
7\SH 2FFXU /DVW'DWH 1H[W'DWH
'D\V8QWLO1H[W&KHFN
GD\V
$XWKRULW\9LVLW
%23'ULOO
%237HVWSUHVVXUH
)LUH'ULOO
.LFN:KLOH7ULSSLQJ
5LJ,QVSHFWLRQ
6DIHW\0HHWLQJ
6SLOO'ULOO
77%23'ULOO
77&DPS)LUH'ULOO
77+6'ULOO
77.LFN:KLOH7ULSSLQJ
770DQ'RZQ'ULOO
775LJ(YDF'ULOO
775LJ(YDFXDWLRQ'ULOO
775LJ)LUH'ULOO
776WULSSLQJ'ULOO
&DVLQJVVHDW
&DV7\SH 2'LQ ,'LQ *UDGH 7RSIW.% %RWWRPIW.% 79'%RWIW.% /DQGLQJ'DWH
&21'8&725
&$6,1* /
&$6,1* /
/,1(5
/,1(5 /
/DVW&HPHQWLQJ
&HPHQWLQJ6WDUW'DWH6WULQJ/,1(5IW.%&RPPHQW;OLQHUKDQJHUSDFNHUVHWLQVLGHOLQHU72OLQHU#
EWPRIIORDWVKRH#
6WJ 7RSIW.% 7RS0HDV0HWK %WPIW.% &RP
6/%7HVWOLQHVWRSVL6/%SXPSEEOV0XG3XVKEEOVFHPHQWGURSZLSHUEDOOEEOV
0XG3XVKDQGULJGLVSODFHZEEOVVOLFNZDWHU6WLQJLQWROLQHUSDFNHUDQGVTXHH]HFHPHQWZEEOVRIVOLFN
ZDWHU&,3#KUV
-RE,QIRUPDWLRQ
-RE3KDVH
:25.29(5
3ODQQHG6WDUW'DWH
6WDUW'DWH
(QG'DWH 3'XUDWLRQGD\V
'DLO\6XPPDU\2SHUDWLRQV
K)RUHFDVW
,QVWDOOWUHH3HUIRUPSDVVSRUWWHVW3UHSIRUULJPRYH
K6XPPDU\
5XQDQGODQG(63FRPSOHWLRQDVVHPEO\1LSSOHGRZQ%23(
2SHUDWLRQDW
3UHSSLQJWRPRYHULJ
7LPH/RJ
6WDUW
7LPH
(QG
7LPH 'XUKU
&XP'XU
KU3KDVH 2SU $FW 3ODQ 2SHU'HVFU
:2 . 3 &RQWLQXHWRUXQLQKROHZLWK(63DVVHPEO\RQ´33)/+<'7.LQWHUQDOO\FRDWHGWXELQJIURP¶WR
¶': .*%5WRUTXHWXUQFRQQHFWLRQVDQG7HQDULVLQVSHFWLQJWKUHDGVDQGVHDOV$GGLQJ%3+RI33*
.&/1D&OELRFLGHWUHDWHGEULQH
:2 . 3 0DNHXS)269ZLWKKLJKSUHVVXUHFLUFXODWLQJKRVHDQGSXPSDWXELQJYROXPHRI%%/DW%30UDWHDQG36,ULJ
GRZQKRVHDQG)269
:2 . 3 &RQWLQXHWRUXQLQKROHZLWK(63DVVHPEO\RQ´33)/+<'7.LQWHUQDOO\FRDWHGWXELQJIURP¶
WR¶': .*%5WRUTXHWXUQFRQQHFWLRQVDQG7HQDULVLQVSHFWLQJWKUHDGVDQGVHDOV$GGLQJ%3+RI33*
.&/1D&OELRFLGHWUHDWHGEULQH
:2 . 3 3-600DNHXSIDVWVZLYHOFRQQHFWRUDQGWXELQJKDQJHUZLWKWZRZD\FKHFNYDOYHLQVWDOOHGLQKDQJHU,QVWDOOFDSLOODU\OLQH
WKURXJKWXELQJKDQJHUDQGWHVWYRLGDUHDEHWZHHQVZDJHORFNILWWLQJVWR36,IRUPLQXWHV3UHVVXUHGFDSLOODU\OLQHWR
36,DQGKHOGIRUPLQXWHVJRRGWHVW&RQWLQXHWRSUHVVXUHXSFDSLOODU\OLQHWR36,ZHUHWKHFKHFNYDOYH
RSHQHGSXPSHGWKURXJKFKHFNYDOYHIRUPLQXWHV6KXWGRZQDQGPRQLWRUHGFDSLOODU\OLQHSUHVVXUHIRUFKHFNYDOYHFORVXUH
#36,/DQGWXELQJKDQJHUZLWK8: .': .9DXOWUDQLQ/'6WHVWLQJXSSHUDQGORZHUWXELQJKDQJHU2'
VHDOVWR36,IRUPLQXWHVJRRGWHVW%DNHU&HQWULOLIWSHUIRUPHGFRQWLQXLW\DQGJDXJHUHDGLQJVZLWKXPELOLFDOFRUG
JRRGWHVW5HPRYHODQGLQJMRLQWDQG/'
:2 . 3 3-603UHSWRQLSSOHGRZQ%23FOHDUFOHDQULJIORRURI&HQWULOLIW*%5FRPSRQHQWVFOHDQGULSSDQXQGHUIORRU%OHGRIIDQG
GLVFRQQHFWDFFXPXODWRUKRVHVIURPVWDFN3UHSIRUULJPRYHUHPRYHSLSHDQGWRROVIURPVKHGHPSW\DQGFOHDQSLWVPRYH
PXGSXPS
:2 & 3 3-601LSSOHGRZQ%23FRPSRQHQWVUHPRYHIORZOLQHDQGORZSUHVVXUHULVHUUHPRYHFKRNHNLOOKRVHVDQG+&5PDQXDO
YDOYHV6HWEDFN%23VWDFNDQGKLJKSUHVVXUHULVHUVHFXUHIRUPRYH&RQWLQXHSUHSULJIRUPRYH
1RWHKUVORVV %%/67RWDOORVV %%/6RI.&/1D&OEULQHELRFLGHWUHDWHG
*DV5HDGLQJV
$YJ%DFNJURXQG*DV 0D[%DFNJURXQG*DV $YJ&RQQHFWLRQ*DV 0D[&RQQHFWLRQ*DV
$YJ'ULOO*DV 0D['ULOO*DV $YJ7ULS*DV 0D[7ULS*DV
:HOO1DPH63)125
:HOOERUH1DPH63)1
:HOO&RGH
-RE:25.29(5
:&(,/HYHO/(9(/
'DLO\5HSRUW
'DWH
5HSRUW
3DJHRI
'DLO\0XG9ROXPHV
7DQN$GGLWLRQ/RVV 7\SH 'HV 9ROXPHEEO
7DQN
+ROH
/RVV
&XPXODWLYH0XG9ROXPHV
$FWLYH9ROXPHEEO
+ROH9ROXPHEEO
$GGLWLRQVEEO
&XP$GGLWLRQVEEO
/RVVHVEEO
&XP/RVVHVEEO
'DLO\&RQWDFWV
3RVLWLRQ &RQWDFW1DPH &RPSDQ\ 7LWOH (PDLO 2IILFH 0RELOH
(QLUHSUHVHQWDWLYH 6WHYH/DZUHQFH $65&(QHUJ\6HUYLFHV 'ULOOLQJ6XSY VLGGULOOLQJ#HQLFRP
(QLUHSUHVHQWDWLYH 'DYLG6PLWK $65&(QHUJ\6HUYLFHV 'ULOOLQJ6XSYVLGGULOOLQJ#HQLFRP
(QLUHSUHVHQWDWLYH 0LWFK%LOOLQJWRQ $65&(QHUJ\6HUYLFHV 5LJ&OHUN $.5LJ&OHUNV'R\RQ#HQLFRP
(QLUHSUHVHQWDWLYH 0DUN+XEOHU %HDFRQ +6( PDUNKXEOHU#H[WHUQDOHQLFRP
7RRO3XVK 5\DQ3DQNUDW] 'R\RQ'ULOOLQJ 7RRO3XVKHU ULJ#GR\RQGULOOLQJFRP
7RRO3XVK 7HG.UXJHU 'R\RQ'ULOOLQJ 7RXU3XVKHU ULJ#GR\RQGULOOLQJFRP
6DIHW\5HSUHVHQWDWLYH +DUROG5LFKDUGVRQ 'R\RQ'ULOOLQJ +6( KULFKDUGVRQ#GR\RQGULOOLQJFRP
6DIHW\5HSUHVHQWDWLYH 6KDXQ7RZHU 'R\RQ'ULOOLQJ +6( VWRZHU#GR\RQGULOOLQJFRP
3HUVRQQHO/RJ32%
&RPSDQ\ 6HUY7\SH :RUN+KU 6WDQGE\+KU &RXQW 1RWH
6&+/80%(5*(5 &HPHQW
$65&(QHUJ\6HUYLFHV 5LJFOHUN
$65&(QHUJ\6HUYLFHV 62$
$65&(QHUJ\6HUYLFHV /LIW$GYLVRU
%($&21 +6(
+DOOLEXUWRQ 0HFKDQLFZLUHOLQH
7HQDULV 7KUHDG5HS
$65&(QHUJ\6HUYLFHV &RPSDQ\PDQ
&203(7(17,$ )XHOHU
+$//,%85721 0XG/RJJHUV
6&+/80%(5*(5 6/%0,6ZDFR0XG(QJLQHHU
9HWFR :HOOKHDG
(;352 :HOO)ORZ
*%5 &DVLQJ6HUYLFH
%DNHU+XJKHV &RPSOHWLRQV
6&+/80%(5*(5 6/%0,6ZDFR0XGSODQW
6&+/80%(5*(5 6/%:,)
:25/(< 5LJ6XSSRUW
'2<21 2QVKRUH5LJ
%236WDFN &RPSRQHQWV
'HVFULSWLRQ
%236WDFN
6WDUW'DWH
/DVW&HUWLILFDWLRQ'DWH
3UHVVXUH5DWLQJSVL
7\SH 0DNH 0RGHO ,'1RPLQ 35DQJHSVL /DVW&HUW'DWH
$QQXODU +\GULO *.
;9%5
V +\GULO 03/
%OLQG6KHDU5DP +\GULO 03/
[9%5V +\GULO 03/
6ORZ&LUFXODWLRQ5DWHV
3XPS1XPEHU 0DNH0RGHO
6WDUW'DWH (QG'DWH /LQHU6L]HLQ 9ROXPH3HU6WURNH2YHUULGHEEOVWN 0D[3UHVVXUHSVL
'DWH 'HSWKIW.% 6ORZ6SG 6WURNHVVSP 3SVL (II 4)ORZJSP
'DLO\%XON
6XSSO\,WHP'HVFULSWLRQ(TXLSPHQW)XHO 8QLW/DEHO*DO 8QLW6L]H1RWH
'DWH
&RQVXPHG
5HFHLYHG
5HWXUQHG &XP&RQVXPHG
&XP5HFHLYHG
&XP5HWXUQHG
&XP2Q/RF
1RWH
6XSSO\,WHP'HVFULSWLRQ0XG3ODQW%RLOHUV 8QLW/DEHO*DO 8QLW6L]H 1RWH
'DWH
&RQVXPHG
5HFHLYHG
5HWXUQHG &XP&RQVXPHG
&XP5HFHLYHG
&XP5HWXUQHG
&XP2Q/RF
1RWH
6XSSO\,WHP'HVFULSWLRQ5LJ)XHO 8QLW/DEHOJDOXV 8QLW6L]H1RWH
'DWH
&RQVXPHG
5HFHLYHG
5HWXUQHG &XP&RQVXPHG
&XP5HFHLYHG
&XP5HWXUQHG
&XP2Q/RF
1RWH
6XSSO\,WHP'HVFULSWLRQ5LJ:DWHU 8QLW/DEHOEEO 8QLW6L]H1RWH
'DWH
&RQVXPHG
5HFHLYHG
5HWXUQHG &XP&RQVXPHG
&XP5HFHLYHG
&XP5HWXUQHG
&XP2Q/RF
1RWH
6XSSO\,WHP'HVFULSWLRQ:,)%RLOHUV 8QLW/DEHO*DO 8QLW6L]H 1RWH
'DWH
&RQVXPHG
5HFHLYHG
5HWXUQHG &XP&RQVXPHG
&XP5HFHLYHG
&XP5HWXUQHG
&XP2Q/RF
1RWH
/DVW$XWKRULW\9LVLW
'DWH
7RWLQVS1EU 7RWDO,1&QXPEHU &RPPHQW
$2*&&%ULDQ%L[E\:LWQHVV%237HVW
6723&DUGV6XEPLWWHG
&RPSDQ\ 5SWV &RP
$&6 $$5
'R\RQ'ULOOLQJ,QF +D]DUG,'
'R\RQ'ULOOLQJ,QF3-60
V
'R\RQ'ULOOLQJ,QF 6WRS:RUN
'R\RQ'ULOOLQJ,QF 2EVHUYDWLRQ
'R\RQ'ULOOLQJ,QF$$5
+DOOLEXUWRQ 6WRS:RUN
0,6ZDFR 6WRS:RUN
0,6ZDFR 2EVHUYDWLRQV
:RUOH\$$5
:RUOH\ 2EVHUYDWLRQV
*HQHUDO1RWHV
&RPPHQW
:HOO1DPH63)125
:HOOERUH1DPH63)1
:HOO&RGH
-RE:25.29(5
:&(,/HYHO/(9(/
'DLO\5HSRUW
'DWH
5HSRUW
3DJHRI
:HOO+HDGHU
3HUPLW&RQFHVVLRQ1
$'/
2SHUDWRU
(1,3(752/(80
6XEVLGLDU\
(1,3HWUROHXP&R,QF
,QLWLDO/DKHH&RGH
'(9(/230(17:(//
5RWDU\7DEOH(OHYDWLRQIW
*URXQG/HYHOIW )LUVW)ODQJHIW
5.%%DVH)ODQJHIW
5.%7XELQJ6SRROIW
5LJV
5LJ1DPH
5,*
&RQWUDFWRU
'2<21
5LJ7\SH
/$1'5,*
5LJ1XP
5LJ6WDUW'DWH
5LJ5HOHDVH'DWH
'DLO\,QIRUPDWLRQ
:HDWKHU
3DUWO\&ORXG\:&
7HPSHUDWXUH)
:LQG
6:#03+
'D\V/7,GD\V 'D\V5,GD\V 32%
6DIHW\,QFLGHQWV1HDU0LVV
'DWH
&DWHJRU\ 7\SH 6XEW\SH 6HYHULW\ &DXVH /RVWWLPH"
1R
&RPPHQW
=HUR+6(,QFLGHQWV5HYLHZHGWKH&
VZLWKDIRFXVRQ&KDQJHRIPDQDJHPHQW5HYLHZHG(QL*ROGHQ5XOHVZLWKDIRFXVRQ(QHUJL]HGV\VWHPV
6DIHW\'ULOOV
7\SH 2FFXU /DVW'DWH 1H[W'DWH
'D\V8QWLO1H[W&KHFN
GD\V
$XWKRULW\9LVLW
%23'ULOO
%237HVWSUHVVXUH
)LUH'ULOO
.LFN:KLOH7ULSSLQJ
5LJ,QVSHFWLRQ
6DIHW\0HHWLQJ
6SLOO'ULOO
77%23'ULOO
77&DPS)LUH'ULOO
77+6'ULOO
77.LFN:KLOH7ULSSLQJ
770DQ'RZQ'ULOO
775LJ(YDF'ULOO
775LJ(YDFXDWLRQ'ULOO
775LJ)LUH'ULOO
776WULSSLQJ'ULOO
&DVLQJVVHDW
&DV7\SH 2'LQ ,'LQ *UDGH 7RSIW.% %RWWRPIW.% 79'%RWIW.% /DQGLQJ'DWH
&21'8&725
&$6,1* /
&$6,1* /
/,1(5
/,1(5 /
/DVW&HPHQWLQJ
&HPHQWLQJ6WDUW'DWH6WULQJ/,1(5IW.%&RPPHQW;OLQHUKDQJHUSDFNHUVHWLQVLGHOLQHU72OLQHU#
EWPRIIORDWVKRH#
6WJ 7RSIW.% 7RS0HDV0HWK %WPIW.% &RP
6/%7HVWOLQHVWRSVL6/%SXPSEEOV0XG3XVKEEOVFHPHQWGURSZLSHUEDOOEEOV
0XG3XVKDQGULJGLVSODFHZEEOVVOLFNZDWHU6WLQJLQWROLQHUSDFNHUDQGVTXHH]HFHPHQWZEEOVRIVOLFN
ZDWHU&,3#KUV
-RE,QIRUPDWLRQ
-RE3KDVH
:25.29(5
3ODQQHG6WDUW'DWH
6WDUW'DWH
(QG'DWH 3'XUDWLRQGD\V
'DLO\6XPPDU\2SHUDWLRQV
K)RUHFDVW
7KLVZLOOEHODVW5:2UHSRUW0RYHWR631/
K6XPPDU\
,QVWDOOWUHHDQGSHUIRUPSDVVSRUWWHVW3UHSWRULJPRYH5HOHDVHGULJIURP63)1#KRXUV
2SHUDWLRQDW
1RDFWLYLW\
7LPH/RJ
6WDUW
7LPH
(QG
7LPH 'XUKU
&XP'XU
KU3KDVH 2SU $FW 3ODQ 2SHU'HVFU
:2 & 3 3-609DXOWLQVWDOOó´FDSLOODU\OLQHVWKURXJKZHOOKHDGDQGQLSSOHXSWUHHLQVWDOOFODPSDQGWRUTXHWRVSHF7HVWHGKDQJHU
YRLGWR36,IRUPLQ%DNHUUHSFKHFNHGHOHFWULFDOFRQGXFWLYLW\DQGJDXJHUHDGVRQSHQHWUDWRUJRRGWHVW
'LVFRQQHFWOLQHVXQGHUULJIORRUDQGLQVWDOOLQGH[HURQUHDUVXEEDVHPRYLQJV\VWHP3UHSURFNZDVKHUIRUPRYH
:2 & 3 3-603HUIRUPSDVVSRUWWHVWRQWUHHSHUSURFHGXUHWR36,IRUPLQUHPRYH7:&DQGWHVWWUHHFDSDJDLQVWVZDE
YDOYH5LJGRZQWHVWHTXLSPHQWIRUZHOO&OHDQSLWVSUHSURFNZDVKHUIRUPRYHDFFXPXODWRUEXLOGLQJIRUPRYHDQGFRQWLQXH
WRGLVFRQQHFWFKRNHOLQHVIURPURRIDOVRGLVFRQQHFWWUDQVIHUOLQHVIURPULJWRYDOYHKRXVH
:2 $ 3 3-600RYHURFNZDVKHUDZD\IURPSLWPRGXOHEORZGRZQULJIORRUPXGSLWVDQGSXPSURRP3RZHUGRZQWRSGULYH
VHFXUHIRUPRYHGLVFRQQHFWSRZHUOLQHVDQGKDQJXSXQGHUULJIORRU'LVFRQQHFWHOHFWULFDOLQWHUFRQQHFWV5HYLHZULJIORRU
VNLGFKHFNOLVW
5LJGLVFRQQHFWHGIURPKLJKOLQHSRZHUDW
:2 $ 3 6NLGULJIORRUWRPRYLQJSRVLWLRQDQGVHFXUHG6SUHDGKHUFXOLWHOLQHUDQGOD\ULJPDWVLQSUHSDUDWLRQIRUULJPRYH
*DV5HDGLQJV
$YJ%DFNJURXQG*DV 0D[%DFNJURXQG*DV $YJ&RQQHFWLRQ*DV 0D[&RQQHFWLRQ*DV
$YJ'ULOO*DV 0D['ULOO*DV $YJ7ULS*DV 0D[7ULS*DV
'DLO\0XG9ROXPHV
7DQN$GGLWLRQ/RVV 7\SH 'HV 9ROXPHEEO
7DQN
+ROH
/RVV
&XPXODWLYH0XG9ROXPHV
$FWLYH9ROXPHEEO
+ROH9ROXPHEEO
$GGLWLRQVEEO
&XP$GGLWLRQVEEO
/RVVHVEEO
&XP/RVVHVEEO
:HOO1DPH63)125
:HOOERUH1DPH63)1
:HOO&RGH
-RE:25.29(5
:&(,/HYHO/(9(/
'DLO\5HSRUW
'DWH
5HSRUW
3DJHRI
'DLO\&RQWDFWV
3RVLWLRQ &RQWDFW1DPH &RPSDQ\ 7LWOH (PDLO 2IILFH 0RELOH
(QLUHSUHVHQWDWLYH 6WHYH/DZUHQFH $65&(QHUJ\6HUYLFHV 'ULOOLQJ6XSY VLGGULOOLQJ#HQLFRP
(QLUHSUHVHQWDWLYH 'DYLG6PLWK $65&(QHUJ\6HUYLFHV 'ULOOLQJ6XSYVLGGULOOLQJ#HQLFRP
(QLUHSUHVHQWDWLYH 0LWFK%LOOLQJWRQ $65&(QHUJ\6HUYLFHV 5LJ&OHUN $.5LJ&OHUNV'R\RQ#HQLFRP
(QLUHSUHVHQWDWLYH 0DUN+XEOHU %HDFRQ +6( PDUNKXEOHU#H[WHUQDOHQLFRP
7RRO3XVK 5\DQ3DQNUDW] 'R\RQ'ULOOLQJ 7RRO3XVKHU ULJ#GR\RQGULOOLQJFRP
7RRO3XVK 7HG.UXJHU 'R\RQ'ULOOLQJ 7RXU3XVKHU ULJ#GR\RQGULOOLQJFRP
6DIHW\5HSUHVHQWDWLYH +DUROG5LFKDUGVRQ 'R\RQ'ULOOLQJ +6( KULFKDUGVRQ#GR\RQGULOOLQJFRP
6DIHW\5HSUHVHQWDWLYH 6KDXQ7RZHU 'R\RQ'ULOOLQJ +6( VWRZHU#GR\RQGULOOLQJFRP
3HUVRQQHO/RJ32%
&RPSDQ\ 6HUY7\SH :RUN+KU 6WDQGE\+KU &RXQW 1RWH
6&+/80%(5*(5 &HPHQW
$65&(QHUJ\6HUYLFHV 5LJFOHUN
$65&(QHUJ\6HUYLFHV 62$
$65&(QHUJ\6HUYLFHV /LIW$GYLVRU
%($&21 +6(
&203(7(17,$ )XHOHU
%DNHU+XJKHV &RPSOHWLRQV
7HQDULV 7KUHDG5HS
$65&(QHUJ\6HUYLFHV &RPSDQ\PDQ
+$//,%85721 0XG/RJJHUV
6&+/80%(5*(5 6/%0,6ZDFR0XG(QJLQHHU
9HWFR :HOOKHDG
(;352 :HOO)ORZ
6&+/80%(5*(5 6/%0,6ZDFR0XGSODQW
6&+/80%(5*(5 6/%:,)
:25/(< 5LJ6XSSRUW
'2<21 2QVKRUH5LJ
%236WDFN &RPSRQHQWV
'HVFULSWLRQ
%236WDFN
6WDUW'DWH
/DVW&HUWLILFDWLRQ'DWH
3UHVVXUH5DWLQJSVL
7\SH 0DNH 0RGHO ,'1RPLQ 35DQJHSVL /DVW&HUW'DWH
$QQXODU +\GULO *.
;9%5
V +\GULO 03/
%OLQG6KHDU5DP +\GULO 03/
[9%5V +\GULO 03/
6ORZ&LUFXODWLRQ5DWHV
3XPS1XPEHU 0DNH0RGHO
6WDUW'DWH (QG'DWH /LQHU6L]HLQ 9ROXPH3HU6WURNH2YHUULGHEEOVWN 0D[3UHVVXUHSVL
'DWH 'HSWKIW.% 6ORZ6SG 6WURNHVVSP 3SVL (II 4)ORZJSP
'DLO\%XON
6XSSO\,WHP'HVFULSWLRQ(TXLSPHQW)XHO 8QLW/DEHO*DO 8QLW6L]H1RWH
'DWH
&RQVXPHG
5HFHLYHG
5HWXUQHG &XP&RQVXPHG
&XP5HFHLYHG
&XP5HWXUQHG
&XP2Q/RF
1RWH
6XSSO\,WHP'HVFULSWLRQ0XG3ODQW%RLOHUV 8QLW/DEHO*DO 8QLW6L]H 1RWH
'DWH
&RQVXPHG
5HFHLYHG
5HWXUQHG &XP&RQVXPHG
&XP5HFHLYHG
&XP5HWXUQHG
&XP2Q/RF
1RWH
6XSSO\,WHP'HVFULSWLRQ5LJ)XHO 8QLW/DEHOJDOXV 8QLW6L]H1RWH
'DWH
&RQVXPHG
5HFHLYHG
5HWXUQHG &XP&RQVXPHG
&XP5HFHLYHG
&XP5HWXUQHG
&XP2Q/RF
1RWH
6XSSO\,WHP'HVFULSWLRQ5LJ:DWHU 8QLW/DEHOEEO 8QLW6L]H1RWH
'DWH
&RQVXPHG
5HFHLYHG
5HWXUQHG &XP&RQVXPHG
&XP5HFHLYHG
&XP5HWXUQHG
&XP2Q/RF
1RWH
6XSSO\,WHP'HVFULSWLRQ:,)%RLOHUV 8QLW/DEHO*DO 8QLW6L]H 1RWH
'DWH
&RQVXPHG
5HFHLYHG
5HWXUQHG &XP&RQVXPHG
&XP5HFHLYHG
&XP5HWXUQHG
&XP2Q/RF
1RWH
/DVW$XWKRULW\9LVLW
'DWH
7RWLQVS1EU 7RWDO,1&QXPEHU &RPPHQW
$2*&&%ULDQ%L[E\:LWQHVV%237HVW
6723&DUGV6XEPLWWHG
&RPSDQ\ 5SWV &RP
'R\RQ'ULOOLQJ,QF +D]DUG,'
'R\RQ'ULOOLQJ,QF3-60
V
'R\RQ'ULOOLQJ,QF 2EVHUYDWLRQ
0,6ZDFR 2EVHUYDWLRQV
0,6ZDFR 6WRS:RUN
0,6ZDFR +D]DUG,'
:RUOH\ 6WRS:RUN
:RUOH\$$5
*HQHUDO1RWHV
&RPPHQW
STATE OF ALASKA
Reviewed B
OIL AND GAS CONSERVATION COMMISSION Z�Zs� 4
P.I. Suprv�
BOPE Test Report for: NIKAITCHUQ SP05-FN07 v' Comm
Contractor/Rig No.: Doyon 15
Operator: Eni US Operating Company Inc.
Type Operation: WRKOV Sundry No:
Type Test: WKLY 1 320-452
PTD4: 2121790 - DATE: 2/15/2021 -
Operator Rep: S. Lawrence / D. Smith
Test Pressures:
Rams: Annular: Valves: MASP:
250/3500 250/3500" 250/3500- 1340 -
TEST DATA
MISC. INSPECTIONS:
MUD SYSTEM:
P/F
P/F
1
Visual
Alarm
Location Gen.:
P .
Trip Tank
P -
P -
Housekeeping:
P
Pit Level Indicators
P
P
PTD On Location
P
Flow Indicator
P
P
Standing Order Posted
P
Meth Gas Detector
P
P '
Well Sign
P
H2S Gas Detector
P
P
Drl. Rig
P
MS Misc
0
NA
Hazard Sec.
P _
BOP Misc
0
Misc
NA
FLOOR SAFTY VALVES:
BOP STACK:
Quantity
P/F
Upper Kelly
1
P
Lower Kelly
1
P -
Ball Type
2
P '
Inside BOP
2
P
FSV Misc
0
NA
BOP STACK:
Quantity
Size
Stripper
0
Annular Preventer
1 -
135/8
#1 Rams
1
4 1/2 x 7
#2 Rams
1
Blind Shear
#3 Rams
1 "
3 1/2 x 6
#4 Rams
0
#5 Rams
0
#6 Rams
0
Choke Ln. Valves
2
- 3 1/8
HCR Valves
4
' 31/8
Kill Line Valves
2
31/8
Check Valve
0
BOP Misc
0
Inspector Brian Bixby Insp Source
Rig Rep: R. Pankmtz / I Flcagle Inspector
Inspection No: bopBDB210215133929
Related Insp No:
ACCUMULATOR SYSTEM:
Time/Pressure P/F
System Pressure 3050 P
Pressure After Closure 2150 P -
200 PSI Attained 11 P
Full Pressure Attained 58 P
Blind Switch Covers: YES P
Nitgn. Bottles (avg): I0(a),3950 P
ACC Misc 0 NA
CHOKE MANIFOLD:
P/F Quantity P/F
NA No. Valves 15 P -
P Manual Chokes 1 P-
P Hydraulic Chokes 1 P
P CH Misc 0 NA
P
NA
NA INSIDE REEL VALVES:
NA (Valid for Coil Rigs Only)
P - Quantity P/F
P - Inside Reel Valves 0 NA
P
NA
NA
Number of Failures: 0 - Test Results Test Time 5.5
Remarks: Tested all gas alarms and PVT's with no issues. Test slack with both 4 1/2" and 5" test joints. Verified both chokes worked.
By Samantha Carlisle at 11:21 am, Oct 22, 2020
320-452
BOPE Test to 3500 psi. 24 hour notice to AOGCC.
10-404
MGR23OCT20 DSR-10/22/2020SFD 10/22/2020
10/23/2020
dts 10/23/2020
RBDMS HEW 11/9/2020
3700 Centerpoint Drive Suite 500
Anchorage, Alaska 99503
Stefano Pierfelici
Phone (907) 865-3320
Email: Stefano.perfelici@eni.com
October 21st, 2020
Alaska Oil and Gas Conservation Commission
333 West 7th Avenue, Suite 100
Anchorage, Alaska 99501
RE: Application for Sundry Approval for SP05-FN7 Rig Workover
Dear Commissioners,
ENI US Operating Co. Inc. hereby applies for a Workover Sundry for well SP05-FN7.
SP05-FN7 is a producer well with ESP lift. The well was completed on Spy Island
on January 23rd 2013.
The well had produced oil with high WC until January 23rd 2014, when the ESP
went down. In February 2014, a CT clean out was performed, detecting a large amount of
sand. After that, a pump change-out was attempted, but it was unsuccessful. A workover
was performed and the well was started up for production in May 2014.
On November 26th 2014, an ESP failure occurred. A workover was performed in
December 2014 and production was restored in January 2015.
On December 6th 2015, an ESP failure occurred. A workover was completed on
May 20th, 2016 and shortly thereafter production was restored.
Due to a suspected tubing leak, the well was shut-in on August 12th, 2017. A
workover was successfully performed in November 2018 and production was restored.
The well has been continually operated until July 23rd 2020, when the well was
shut in due to suspected tubing leak. Rigless operations started on August 28th 2020.
After setting an Evo Trieve at 10,001 ft MD, attempt to pressurize the tubing failed,
revealing communication tubing-annulus. Two Caliper and Acoustic Log runs detected
multiple holes at 74.2, 75, 77.2, 77.8, 171 and 422 ft MD.
The estimated date for beginning this work is January 15th, 2021.
Please find attached for the review of the Commission forms 10-403 and supporting
documentation.
If you have any questions or require further information, please contact Alessio Medea at
907-865-3347.
Sincerely,
Stefano Pierfelici
Well Operations Project Manager
SP05-FN7 Workover – Proposal Summary and Wellbore Schematic
PTD#: 212-179
Current Status
Well SP05-FN7 is currently shut down due to multiple tubing leaks detected through
Caliper and Acoustic Logs.
Scope of Work
Scope of this workover is to pull the current tubing completion and recomplete with a
new conventional ESP system and coated tubing. Repair has to be completed with no
HSE accidents or incidents, to comply with state AOGCC and company requirements.
General Well Info
Reservoir Pressure/TVD: Wellhead pressure during shut-in is around 1350 psi
Wellhead type/pressure rating: Vetco Gray, MB-247/5000 psi
BOP configuration: Annular/Pipe/Blind/Pipe
Well type: Producer
TIFL/MIT-IA/MIT-OA: Intermediate 9-5/8” casing was tested to 1500 psi
during workover on November 24th, 2018.
Estimated start date: January 15th, 2021
Drilling Rig: Doyon 15
Drilling Engineer: Alessio Medea
Alessio.medea@eni.com
Work: 907-865-3347
Well Operations Project Manager: Stefano Pierfelici
Stefano.pierfelici@eni.com
Work: 907-865-3320
Procedure Summary
1. MURU Doyon 15;
2. Kill the well;
3. Set BPV;
4. N/D X-tree;
5. Set Blanking Plug;
6. N/U BOP and test to 250/3500 psi; 24 hour notice to AOGCC to witness;
7. Pull out of hole Blanking Plug and BPV;
8. POOH tubing and lay down ESP assembly;
9. Perform a contingent clean-out run;
10. MU new ESP assembly and RIH new coated tubing to setting depth;
11. Land hanger and test it;
12. Install BPV;
13. N/D BOP;
14. N/U tubing adapter and X-tree;
15. Pull BPV;
16. Install Two Way Check Valve and test X-tree;
17. Circulate Freeze protect through X-tree down IA;
18. RDMO.
Below the current schematic of the well:
Vetco Gray, MB-247/5000 psi
STATE OF ALASKA' cf,
ALASKA OIL AND GAS CONSERVATION COMMISSION N^'4 0 u
REPORT OF SUNDRY WELL OPERATIONS pF'ki 0 1 2019
1. Operations Abandon L Plug Perforations LJ
v v Operation shutdown
Fracture Stimulate L Pull Tubing j
Performed: Suspend ❑ Perforate ❑
y
CO,� /yC
Other Stimulate ❑ Alter Casing 21 n n r d rogram ❑
Plug for Redrill ❑ Perforate New Pool ❑
Repair Well ❑Q Re-enter Susp Well ❑ r `y �eT: -E Chance Out ❑✓
2. Operator Eni US Operating Co. Inc.
4. Well Class Before Work:
5. Pennit to Drill Number:
Name:
Development Exploratory ❑
Stratigraphic ❑ Service ❑
212-179
3. Address: 3800 Centerpoint Or Ste 300, Anchorage, AK
6. API Number:
99503
50-629-23481-00-00
7. Property Designation (Lease Number):
8. Well Name and Number:
ADL 0391283, 0388583, 0388581, 0388571
SP05-FN7
9. Logs (List logs and submit electronic and printed data per 20AAC25.071):
10. Field/Pool(s):
Caliper
Nikaitchu / Schrader Bluff Oil Pool
11. Present Well Condition Summary:
Total Depth measured 21230 feet
Plugs measured N/A feet
true vertical 3733 feet
Junk measured N/A feet
Effective Depth measured 20617 feet
Packer measured N/A feet
true vertical 3918 feet
true vertical N/A feet
Casing Length Size
MD TVD Burst Collapse
Structural
Conductor 160 20"
160 160
Surface 3909 13-3/8"
3909 2452 5210 2480
Intermediate 11889 9-5/8"
11889 3997 6890 4790
Production
Liner 8911 5-1/2"
20674 3910 slotted slotted
Perforation depth Measured depth 11889-20617 feet
True Vertical depth 3997-3918 feet
Tubing (size, grade, measured and true vertical depth)
4-1/2" 12.6 opt L80 10065' MD 3,668 TVD
Packers and SSSV (type, measured and true vertical depth) N/A N/A N/A N/A
12. Stimulation or cement squeeze summary:
1 6 r MD
1
Intervals treated (measured):
ed57+�q{- le,)-#/�11� L3li
�`il"/
Treatment
AU k-
descriptions including volumes used and final pressure:
5
2Z� I,+
13.
Representative Daily Average Production or Injection Data
Oil -Bbl
Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure
Prior to well operation: 1405 43 1714 268 1281
Subsequent to operation: 304 37 11491 165 1283
14. Attachments (required per 20AAC 25.070, 25.071, s 25.283) 15.
Well Class after work:
Daily Report of Well Operations ❑�
Exploratory ❑ Development ❑Q Service ❑ Stratigraphic ❑
Copies of Logs and Surveys Run ❑Q 16. Well Status after work: Oil Gas L WDSPL
Printed and Electronic Fracture Stimulation Data ❑ GSTOR ❑ WINJ ❑ WAG ❑ GINJ ❑ SUSP ❑ SPLUG ❑
17. 1 hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt:
318-360 318 -- j o G
Authorized Name: Stefano Pierfelici
Contact Name: Amjad Chaudhry
Authorized Title: ell Operations Pro)qct mana er Contact Email: amiad.chaudhryCWeni=m
907-865-3379
Authorized Signature:
Date: 1i Contact Phone:
11
Form 10-404 Revised 4/2017 RBDM
Oii Z:in�q EB 0 8 201lubmit Original Only
Surf. Casing
13-3/8", 68 # 3,909'
MD, 2,452' TVD
78° Inc.
Nikaitchuq Field —Spy Island
4-'/2" 12.6 ppf Production Tubing Hydril 563
baltel internal casing patch ID 7.95
top 2,265.49' and bottom 2,284.51'
MD (1931.6' to 1944' TVD)
(maximum external pressure rating of
the patch is 1,130 psi)
4- Y2 x-cplg—able Vis, for ESP
Power Cable, (1) 3/8" Chem Inj Line
with 2500 psi check valve at bottom
e ((11 i petroku n`nl
SP05-FN7
Oil Producer with
ESP Lift
As Completed
11/30/2018
10,065' MD, 3,668' TVD, 790 Inc – Bottom of Motor Centralizer
Centrilift, ESP, 66 Stage FLEX 47 SXD, 20 stage GINPSHH SXD, 538,
250 HP 562 XP Motor
10,106' MD 23# Shroud Assembly, cable and chemical injection
line feed-thrus.
11,764' MD, 3,975' TVD - Baker SLXP Liner Hanger Packer
Interm. Casing
9-5/8", 40#
11,889' MD, 3,997' TVD
84° Inc.
HAL 5-'/z" Oil Swell
Packer
Slotted Liner,
5-'/" 15.5 ppf
5-/" Silver Bullet Ecc.
Nose Guide Shoe
20,675' MD, 3,910'
TVD 970 INC.
Top Hanger Packer T
20,617 MD, I
3,918' TVD,
97° Inc. Cement Squeeze
Item
MD t
5-1/2"
e
1 20558
5-1/2"
e
2 19856
5-1/2"
a
17982
5-1/2"
a
16245
i-112"
e
5 14994
15-1/2"
e
6 13653
Nikaitchuq Field —Spy Island
4-'/2" 12.6 ppf Production Tubing Hydril 563
baltel internal casing patch ID 7.95
top 2,265.49' and bottom 2,284.51'
MD (1931.6' to 1944' TVD)
(maximum external pressure rating of
the patch is 1,130 psi)
4- Y2 x-cplg—able Vis, for ESP
Power Cable, (1) 3/8" Chem Inj Line
with 2500 psi check valve at bottom
e ((11 i petroku n`nl
SP05-FN7
Oil Producer with
ESP Lift
As Completed
11/30/2018
10,065' MD, 3,668' TVD, 790 Inc – Bottom of Motor Centralizer
Centrilift, ESP, 66 Stage FLEX 47 SXD, 20 stage GINPSHH SXD, 538,
250 HP 562 XP Motor
10,106' MD 23# Shroud Assembly, cable and chemical injection
line feed-thrus.
11,764' MD, 3,975' TVD - Baker SLXP Liner Hanger Packer
Interm. Casing
9-5/8", 40#
11,889' MD, 3,997' TVD
84° Inc.
HAL 5-'/z" Oil Swell
Packer
Slotted Liner,
5-'/" 15.5 ppf
5-/" Silver Bullet Ecc.
Nose Guide Shoe
20,675' MD, 3,910'
TVD 970 INC.
Top Hanger Packer T
20,617 MD, I
3,918' TVD,
97° Inc. Cement Squeeze
Well Name:S
Wellbore Name: e: SP05P05-FNFN7
Well Code: 26944
anip� Job: WORKOVER
WCER Level:
Daily Report
Date: 10130/2018
Report #: 1
Page: 1 of 2
Well Header
Por utl ntesslon W Operator gubaltl ary InlNal Lobes Code
ALASKA ENI PETROLEUM ENI PMroleum Co. Inc. DEVELOPMENTWELL
Rotary Table Elevation RD W.er Depm(it) First Flange(R) RKB - Base Filings UQ RKB - Tubing SucM(ftl
5362 0.00 18.9] 3665 3174
Rigs
Rig Name Corior Rig Type Rig Num R g $tart Dale Rig Release Date
RIG 15 00VON LAND RIG 0723 1225201]
Daily Information
Weather Temperature(°FI Wind Bay a LTl(days) Days R! (days) POB
86 NE@6MPH 33].00 337.00 850
Safe
Safety Incidents -Near Miss
Dah, Category Type Subtype 6evernty use 1-osttime2
Comment
Safety Drills
Days Until Next Check
Type
#Occur
Last Date
Next Data
(days)
pecdion
2 8/312018
9/112018
-59
Safety
Safety Meeting
2 BI312018
902018
-59
TT Rig Evacuation Gill
1
W112018
11292018
30
Casings seat
Cas. Type
00 it.)
to (in)
I Grade
I Bull An
i Bottom (RKB)
I TVD BOL(RKB)
Run Oah
CONDUCTOR
0
1600
1/12011
CASING
13318
12.42
L -W
-0.1
3,W9.0
2,4525
12/192012
CASING
95/0
L
8.84
L-80
O.t
11,9Be0
3,995.0
IVM2012
LINER
512
4.95
L-80
11,]]1.0
20,6]5.0
J,901.0
111]2013
LINER
312
20.616.6
20,873.0
3,901A
UX2014
Last Cementing
Cementing Start Date: Sn2014 SMng: LINER. 24673.OXKB Comment 3. ' X 5.5- liner hanger/ packer set inside 5.5" finer, TO liner C 20,618', Mm of float shoe 20,673'.
Stg# Tooth
Top Meas Meth
Btn(ftl i Cam
1 20.618.0
211,673 0 SLB Test Ilnes to 3500 psi. SLS Pump 25 bMs 10.5# MWPush, 25 bbls 158# cement, drop 5"wiper Call, 15 bbls
10.5# MudPush and rig displace wl 184 tats slick water. Sting into Ther packer and seueexe cement wl 43 this m slick
water. CIP @ 1010 hos.
Job Information
Job PM1ase planned Std Ose Start DaleEnd Date PSD Dungen (Moral
WORKOVER 10Swisci91a:o0 10130201818:00 0.00
Daily Summary Operations
2Ah Forecast
Solid rune end kill well. Move dg over well.
24h Summary
Rig up Iger tank and bleed well. Bled well fin, 2'/° hours from tubing, a total of 355 bbis of diesel 6.8 pp9, press re: Tuber, 337 In 154 psi, UAW to 160 psi. OA -340 to 190 psi.
OPerslon at 07.00
Monitor well. Prepare to move dg.
Time Log
Start
End
Co. Our
Time
Time
Dur (br) (hr)
Phase
Opr.
Act
Plan
Oper. Oeacr.
1]:OD
0:0
7.00 7.00
W.
A
P
Presse to move SIMOPS berm Iger tan and up 10-k We l heads ng to tlger tank. Bled will far a totalof ours
1m tubing. BMetl for 15 minutes and allow pressure to stablll¢e before documenting pressure and starting another 15
minutes of bleed. A total of 355 plus of diesel was bled ag and ro gas, SS PP9, pressures dropped 150 pan, Tubing 337 to
181 psi. IA -330 to 180 psi, 0A-340 to 201 psi. All pressures medical close b Me same decreases. Ager total of 2 hours bleed
the wax was shut in. Tubing pressure was IM and increased to 175 psi after 30 mMutes, increased to 181 psi after an hour.
W pressure was 160 psi after Me bleed and increased to 105 psi after 30 min pace and was at 180 after one hour. The OA
Pressure was 190 psi after Me blood aincreased to 200 psi after SO minutes and stayed at 200 psi other we hour.
Operation
from 00:00 !0 08:00
Stad
Enit
Cum Dur
Time
Ti..
.1 Mr)
(Iml
Phase
Our. Act.
Plan
Chet. Des.,
0000
08:300.50
15.50
W.O.
A 2
P
Prepare rig for move, Scoops Need tubbing im 15 minutes, shut and stabile far 15 mmutes.
Tubing=130119W6 PSI
IA= 1608501140 psi
OA= 1801IM178 psi
7.2 ping ch dendnesel recovered at 15.20 bble per cycle.
15 min Meed and 30 min shut irtWba=90psi, IA=1blind, OA=IOne.
15 min bleed antl 15 min shut nnEUCe=1ISpiel. IA=150psn, 0A- Whirrs
90 min bleed and 30 min shut nn:tube=106psi, M=136psn, OA=144psi
Primary gas with 13 Due of L3 on recoveretl.
Blow down lines to tiger tank and pump #3.
as Readings
Avg Background Gas (%) Max Background Gas l%)
Avg Connection Gas (y)
Max Connection Go CA)
Avg Drill Gas (%1 Max Drill Gas (%)Avg
Trip Gas (°6)
Max TNp Gas ng)
Cumulative Mud Volumes
Active Volum¢ (bd) Hale Volume MIA) intuitions MIN) Cum Addition. (Cbl) I Losses (bbl) Cum Losses (CCS
Daily Contacts
Position
Contact Name
Company
Title
Email
Office
Mobile
End nepresentahve
amce Simonson
End
Drilling Supv.
nddnifngigirmlooroleum.com
907-685-0715
End repoesenM6ve
Mike Grubb
Enl
Drting Supv.
siddnllingitempeboieum.com
907685-0715
End reP.N.d
Arl Chaudhry
EN
Drilling Engineer
Ent repredentetive
Wed. Thomas
Em
Rig Clerk
AKRgClerke0ayonl5itempelmleum,
9076850722
End representative
Mark Hurler
Enh
HSE
com
Ent representative
Grind Leonard
End
HSE
Tool Push
Justin Hays
Doyen Drilling
Tool Pusher
ngl5didoyondrilling.cem
Tool Push
Ted Kruger
Dayan DrIlk,
Tour Pusher
ug15@doyoMn1lin9.com
9076050718
Tool Push
Hamid Richardson
Option Dung
HSE
limmardsoultski unllNgcom
685-0796
Tool Push
Scott Simmons
Doyen Ddl6mt
HSE
Well Name: SP05-FN7 OR
Wellbore Name: SP05-FN7
Well Code: 26944
Job: WORKOVER
WCER Level:
Daily Report
Date: 10/3012016
Report p: 1
Page: 2 of 2
Personnel Log (POB)
Company
Sam. The
Work H (bD
Standby H (I
Count
I Note
Archer
commlas,iming
12.50
0
Drilling
Doyon
Ratti Superintendent
12.50
0
Drilling
Canng
Rig Watch
1250
0
Drilling
ASRC,
Clerk
12.50
1
Drilling
ASRC
SOA
12.50
1
SIDSupport
ASRC
Crane Advisor
12.50
1
SID Support
Beacen
Nestle
12.50
1
SID Support
MI Sees.
MW Plant
12.50
1
Drilling
NOMem Oilfeild Seoicea
Foster
12.50
1
SID Support
Hallibunon
Mud loggers
12.50
1
oruing
ACS
Environmental
12.50
2
SIO Support
ASRC
Conpany Men
12.50
2
Drilling
Beemn
HSE
12.50
2
SID SUppod
Doyon
Tool .he.
12.50
2
Driving
Doyon
HSE
12.50
2
Dulling
tittle Rod Sae..
Pumping
12.50
2
SIDSupWrt
Vetm Gray
Wellhead
12.50
2
Drilling
ASRC
Logkfe
12.50
3
SID Supporl
Purcell
Security
12.50
4
SID Support
GBR
Casing Serres
12.50
4
Drilling
Baker Hughes
Baker Hughes Centrilift
12.50
5
Dnilling
Ml Swam
WIF12.50
5
SIO Support
Jambs
Truck tluver I Cone operator
12.50
10
Drilling
ESS
Catering
12.50
11
SID Suppod
Doyon
Rig Personnel
12.50
22
On1ing_T.GI Dulling Personnel 53
BOP Stack 6 Components
Description
Start Data
last Certification Data Pressure Rating (pari
Type Make Model
ID Nam go,
I
PRange (psi) Last Deft Data
Slow Circulation Rates
Pump Numbs: Make:
Model:
Sbrt Da@ I End Date
Liner St. fl.) Volume Per areas Override (bbllatp Max Pressure (psi)
Date I Depth (NKBI
Stew Sod
Strokes, (spm)
P load
EN(%I O Flow (gpml
Daily Bulk
Supply Item Description: Equipment Fuel
Unit ulasI
Gal
Unit Size: 1
Note:
Data Consumetl Recelvetl
Returned
Cum Consumed
I Cum Received Cum Returned
OUm On Loc Note
Supply Item Description: Mud Plats Bailers
UnNLabel:
Gal
Unit Size:
Note:
Data Consumetl Receivetl
Returned
Cum Consumed
Cum Recelved I Cum Returned
I Cum On Loc Note
Supply Nem Description: Rug Fuel
Unit Legal;
gal us
Unit Size:I
Note:
Data Consumed Recelved
Returnetl
Cum Consumetl
Co. Received Cum Returned
Cum Go Loc Note
Supplyltem Deacriptlon: Ry Water
Unit Lahel:
bbl
Unit Size:1
Note:
Date Consumed Recelvetl
Returned
I Cum Consumed
Cum Recelved I Cum Returned
Cum On Lpp I Note
Supply It.. Description, WIF Bagels
Unit Legal:
Gal
Unit Size:
Note:
Data Consumed Recelead
Returned
Cum Consumed
Cum Received Co. Returned
I Cum On Loc I Note
Supply Item DuscHption: WIF Injected DNael
Unat Label:
Gal
Unit Size:
N.
Date Cpnsumad Receivetl
Returned Cum Consumed
Cum Received Cum Returned
Cum On Loc Note
Last Authority Visit
Date Tot map. Nor Total LN.C. number Comment
STOP Cars Submitted
Company
d Rprs
Con
Doyon Drilling
PJSM'S
Doyon Drilling Inc.
Safe Cards
Doyen Drilling Inc.
COW
Doyon Dulling Inc.
HRWS
Ml Swam
HARCUSA
MI Swam
RIR's
General Notes
Comment
Well Name:N7 OR
Wellbore Name: e: SPSPOS-FNFN7
Well Code: 26944
anir�tl'I Job: WORKOVER
WCER Level:
Daily Report
Date: 10131/2018
Report #: 2
Page: 1 of 2
Well Header
Permi.0oncession N- Operebr Subaltllary Initial Lahee Code
ALASKA ENI PETROLEUM ENI Patrdeum Co. Inc. DEVELOPMENT WELL
Rotary Table Elevation( h) seem, Depth ON) Frsr Flange fit) RKB - Base Flange (k) RKB-Tubing Spool (h)
5362 000 16.9] 36.65
Rigs
Rig Name Conhedw Rig Type Rig Num Rig Start Date Rig Release Data
RIG 15 DOYON LANDRIG 0723 1225/2017
Daily Information
Weamer Temperature PFI Wind Days LTI (days) Days NO (Being POB
Cloudy WC -1]' -].6 ESE�eMPH 338.00 338.00 83.0
Sa ety Incidents - Near Miss
Data category Type Subtype Silvestri Cause Lost timet
Comment
Safety Drills
Days Until Next Check
Type
poccur
Last Date
Next Date
(days)
Rig Inspemfin
28131/2918
9/1/2018
s...40
40
Safety Meeting
28/312018
9/1/2018
40
Rig E Onll
1813112010
018
29
C s scan
Casings seat
CaS.TYPe
DD (in)
to (I.)
Grade
Top(ftKB)
Bottom lit")
TVD Bot(OKB)
Run Data
CONDUCTOR
160.0
160.0
1/112011
CASING
13318
1242-
4.1::.
2,452.5
12/1.2.2
CASING
9518
8.84
L-80
D.1
11,989..
3,995.0
12/302012
LINER
512
4.95
L-80
11,]]1.0
20.875.0
3,9010
111712013
LINER
312
20,616.6
206730
3.901.4
502014
Last Cementing
Cementing Start Date: S72014 Sbing: LINER, 20,8 3.0 KB Comment J.5" X fis' liner hanger/ pecker set indite 5.5" liner. TO liner @ 20,618', ban of goat shoe @ 20,6]3'.
Stgb Top (i
Top Meas MeM Bhn(WEII
I Com
1 20.6180
20,8 3.
LB Teal linea to 3500 psi. SLB pump 25 bible 10.54 WdPush, 25 able 1584 cement, drop V wiper Dall. 15 pole
10.54 MudPush and dg displace .1 184 bole slick wales Sling into liner racket and squeeze cement w143 Ohms of slick
water. COP ®1010 hrs.
Job Information
JOD Phase PbanneU Start Deb BbO Date End Data P50 Duration (days)
WORKOVER 1W301201818:00 to13a201818:00 000
Dally Summary Operations
272 Forecast
Kill well, move rig over well.
24h Spmmary
Monitor pressums after 93 ppg bane was pumped roto well. Build and pump 9.6 ppg Anne and kronor well. Well not dead.
Doused.at OT.00
Blamm, tlown well.
Time Log
Start
Eral
Co. Dur
Time
Time
our (tin
@q
Phase
on,
Act.
Plan
Oper. Descr.
0000
0850
850
W.O.
A
2
P
Prepare Or, for move, Elmore D ead tubing in 15 measure. shut and stabs 2e for 15 minutes.
Tubing=13aIM6 PSI
IA= 160,1501140 psi
OA= 18.1801178 psi
7.2 Dp9 m+tlefi iesel renowned M 15-20 bola per cycle.
15 min bleed and 30 min shut 1.1.1 =90pai, M=150psi, OA=165pmt
15min bleed and 15 min shut in4obe=118psi. K=1 Saps, DA•160psi
g0 min bleed and 30 min Out ialube=106psi. M=Iftie. OA=144psi
prmary gas with 13 bible of ].3 ppg monverea.
Bow down Imes b Iger bank and pump 0
0830
18:00
9.50
1800
W
A
2
P
Mlnue preparing dg mt move, Simops continue to monitor pressures on well shut in Our 3 boors, assume Increased,
Tubing 188200 DSO, IA 201220 PSI. CA. 2141220 poi.
Bleed WWg OO for 5 minutes reoovemg 10 bale diesel and cruise min some gas. Pressures aper blaedland every hour for
me next ] hours :
Tube: 1]1I21422p22622923223N23T W.
IA• 1762132242262291232230 236 psi,
OA= 19522a22a22a229I29024a240 Poi,
18:00
1900
100
19M
WO
A
9
P
Pump 220 oble 0 9.6 pmt bane down luIng, FCP=1030 psi at 194 ,m,
Sbart pressures: Tune=137psl, V=140psi, OA=160md
Finalprearmar Tube J16psi.IA SBOpsi,CA=570pai
1900
23:00
4.00
2300
W.
A
9
P
Pump 1050 able of Its ppg brine down Vc P�0 at 252 gpm.
Start pressure. tuba=3psl, IAn280pgi. IA=280psi
Fort dm press: tube=]20psi, IA=680, OA=880DSO at 6 ban.
2300
00:00
100
2400
W.O.
A
2
P
Continue with pmpare4ons for ng move, shut in well and monitor, how down lines.
15 min-Iuby81 psi, OA-�10pd. OM590p31
30 min tube=M5pN, WQ80psI, OA=520psi
45mm- tuba<313psi, IA=260pai, CA=490psi
BOmm- tuba=303psi, A=24501, OA=460pai
Gas Readings
Avg Background Gas (%)
171
Ges (Y.)
Avg Connection Gas (•A) Max Connection Gas PA)
Avg Drill Gas
Max Drill Gas (%)
Ark, Me
g Trip Gas I%) x Trip Gas (%)
Cumulativea Mud Volumes
Active Volume (big) Hole Volume (bbl) Addklon5 (bbl) Cum Additions (bot) Losses fbbil Cum Losses (bop
Daily Contacts
Position
Contact Name
Company
This
Eased
ORe
Mobile
Eni representative
Bmce Simonson
Ern
Drilling Supv.
Zddnlling enmetremum.com90]8850]15
Eni repreaeMativa
Mike Gable
Eni
Drilling Supv.
sidddlling�musalmleum.opm
90]485-0]15
Eni representative
Mitch aOlingbn
Eni
Rig Clak
AKRgClarks0oyonl Sltenlpetleum.
9074054722
EM repbsentatiea
Mark Hubner
Eni
HSE
.in
Eni fepreaonbathre
David Leonab
Eni
HSE
Well Name: SP05-FN7 OR
Wellbore Name: SP05-FN7
Well Code: 26944
Job: WORKOVER
WCER Level:
Daily Report
Date: 10131/2018
Report #: 2
Page: 2 of 2
Daily Contacts
P.11W.
Contact Name
Company
Tlda
Email
offs.
Mobile
Tool NA
Hays
Doyon DrillingTocl
Pusher
ngl5EdoyDMNIlI1lg.com
Tool Ppsh
Ryan Pankralz
Down Drilling
Tour Pusher
rig15Qdpyontldlling.c m
11...
Tool Push
Cliff Donato
Doyon Unit,
HSE
comanattooeandfinfling,con,
8850]98
Tool Push
Scott Sknmons
Doyon Drilling
HSE
Personnel Log (POB)
Company
Sew. Type
Work H(N)
Sbntl-byH(N)
Count
Note
Doyon
RodSupsrintendenl
12.50
0
Dolling
Cenng
Rg Watch
12.50
0
Dnlling
ASK
Cleric
12.50
1
Drilling
ASRC
SOA
1250
1
SID Support
ASK
Crane Advisor
12.50
1
SID Support
Beacon
Medic
12.50
1
SID Support
MI Swaoo
Mud Plant
12.50
1
Dulling
Northam Oilhow Service.
Fueler
12.50
1
SID Support
HaIIWYMn
had loggers
12.50
ACS
al
12.50
2
SIDSu
Srigin, Support
ASRC
Company
Campamy Man
12.50
2
Dulling
Beacon
HSE
12.50
2
SIDSupp°n
Doyon
Tool pushers
12.50
2
Drilling
Doyon
HSE
12.50
2
Drilling
Little Red Services
Pumping
1250
2
SID Support
Veho Gray
WelMeed
12.50
2
Drilling
GER
Casing Service
12.50
2
Dnllmg
ASK
L°gisgc
12.50
3
SID Support
Baker Hughes
Baker Hughes Cenlrilib
12.50
5
Drilling
Ml Swaco
WIF
12.50
5
SIDSupport
Purcell
Security,
12.50
5
SIO Support
Jacohs
Truck driver Crane operator
12.5010
Drilling
ESS
Caterilg
1250
10
SIDSupport
Doyon
Rig Personnel
12.50
22
Onlling Total Drilling Personnel N
BOP Stack & Components
DescbPN°^
Start Dab
Last Certification Dale Pressure Rating (psi)
Type
Make Model
ID N. (in)
PRange (psi)
Lasl Cart Date
Slow Circulation Rates
Pump Number: Make:
klotlel:
SbrtDale End Date
Uner St. (I.)
Volume Per Stroke Override(bMsM) Max Pressure (psi)
Date
Moth(KKB)
Slow Bpd
Smokes Want)
P(pal)
EX (X)
OFlow tgpml
Dally Bulk
Suppty Item Description: Equipment Fuel
UMI Label:
Gel
Unit Size: 1
Note:
Oeb Consumetl Recelvetl
R.Wrnetl
Cum Consumetl
tum Recehetl
Cum Remrnetl Cum On Loc Nole
1onlnme 1 o55.o tass.o
torso
1,asba
o.o
o.o
sup pty Ilam Dperip0do Mud Plant Boners
UMI Label:
one
Unit Size:
Note:
Data Consumetl Receivetl
Returned
Cum Consumed
Cum Received
Cum
Returned Cum On Loc NINe
lonlixis 42.a 4z.o
42.0
4z.o
0.0
0.0
supply Hem Macriptlon: Rig Fuel
Unit Label:
gal us
Units.:1
Note:
Oab Consumetl Resolved
Returned
Consumetl
Cu. Received
Cum Returned Cum On Loc Note
10/3112018 1.893.0 8.893.0
1693.0
5893.0
00
7,2000
Supply Item Description: Rig Water
Unit Label:
bbl
Unit Size: t
Nola:
Gate Consumed Receivetl
ReNruetl
Lum Consumed
Cum Received
Co. Returuetl Cum On Loc NOW
10/312018 330 127.0
330
129,0
00
94.p
Supply Item Description: WIF Boilers
Unit Label:
GM
Unit he
Nofe:
Dab Consumetl Racelve0
Returned
Cum Consumed
Cum Received
Cum ReturnedCum On Loc Note
1013112018 198 0 198.0
198.0
198.0
0.0
CO
Supply IbDescripM1o^: WEIn ecled Closed
UMt Label:
Gel
Unit Size:
Note:
Doe Consumetl Receloed
ReNrnetl
Cum Consumetl
Cum Received
Cum Returned Cum On Loc Note
10912018 114.0 ]14.0
]14.0
]14.0
0.0
0.0
Last Authority Visit
Dab Tot map. Nor TotM I.N.L. number Comment
TOP Cards Submitted
Company
4 R
Com
Doyen Doling
7
PJSM'S
Doyen Detling Inc.
15
Safe Cares
Doyon Calling Inc.
]
HRWB
Doyon onto, Inc.
]
DOW
MI Swaco
4
IARC/JSA
MI Swaco
4
Res
General Notes
Comment
Well Name:N7 OR
Wellbore Name: e: SPEPOS-FNFN7
Well Code: 26944
Job: WORKOVER
ani WCER Level:
Daily Report
Date: 11/1/2018
Report A: 3
Page: 1 of 2
Well Header
PennibConce akin N°
Oceralm Subcitliary dial Lahee Code
ALASKA
JENIPETROLEUM ENI Pefmleum CG. Inc CEVELOPMENT WELL
Rotary Table elevation To Water Depth (it) First Flange(ft) RKB-Base Flange (ft) RKB- Tubing Spool Od
53.62 0.00 16.9] 3fi 65 31.74
Rigs
Mg Name Conhacbr Rig Type Rig Num Rig Steri Date Rig Release Date
RIG 15 OOYON LAUD RIG 0723 12/25201]
Daily Information
Weather Temperature(°F) Wind Days LTlidays) Days Ed idays) POS
Cloudy WC 19° 29.6 SW 0g 19 MPH 339.00 339 DO 840
afety Incidents - Near Miss
Date Cabgwy Tyce Subtype Severity Cause Lost dmei
Comment
Safety Drills
Days Unb Next Check
TYpe
w Occur
Last Date
Next Data
Nays)
pe n
3 11/1/2018
1122018
1
eti
Safety Meeting
Safety
3 11112018
1122018
i
TT Rig Evacuation NO
1 10/312018
12912019
gg
Casings seat
Cas. Type
OD (in)
IO (in)
Grand
Top(ftKB)
SotiOm(ROME)
Tim But. IRKB)
Run Date
CONDUCTOR
160.0
160.0
t/1/201
CASING
13318
12421,-80
-0.1
3,9090
2,452.5
12n92012
CASING
9513
8.84
L-80
0.1
1:8890
3.985.0
12/3012012
LINER
512
4.95
L-80
11,]]1.0
296]5.0
3,801.0
1/1]12013
LINER
312
20,616.6
2D,673.0
3,901.4
522014
Last Cementing
Cementing Start Date: 5nr2014 String: LINER, 20,8]3.OM(B Comment: 3 5 X 5,V Mar hanger/ packer set inside 5.5" IineL TO liner 0 20,618', btm of add has @ 20.673'.
SN# I Toppd(B) Top Meas Mein BM 1ROce) I Conn
1 20,6130
20.8]3.0
6LB Test lines to 3500 psi. SLB pump 25 bids 10.50 MudPush, 25 bible 15 Be cement, drop 5' wiper ball, l5 bbls
10.5N MudP sh and He displace w/ 184 mils allies water. Sting into liner packer and squeeze cement wl 43 we of slick
water. CIE 9T 1010 hem
Job Information
Job PM1ase Plannetl Start Gate Start Dale End Dab P50 DOM—=(ddye)
WORKOVER 10130201818:00 10/30201818:00 ggg
Daily Summary Operations
24h Forecast
Complete dg up and rig =eplance. Nipple down tree, Nipple up BOP s. Teat SOP's.
lam Summary
Monitor well pressures after pumping 9.6 ppg /till fluid Bleed diesepcmde mix from Tubing. Bleed diesel/cmde from A -annulus. Rg dawn and move rig. Stan rig up uderrennds.
Operation at 07.00
Hooking up iemonnects lines and pump 3 hook up.
Time Log
Start
End
Cum Our
Time
Time
I nor (bl
Ib)
Phase
Opr.
I Act
Plan
op a-
R.
60
01:30
1.50
1.50
O
A
1
P
oMinue getiirg ng res y tp move, con6nge to monitor w.l e m Right mud pumped down Turing and A -Annulus (96
ppg (nine).
Time Tube A -Annulus BAnnuks
0000 289 pal 235 psi 425 psi
0130 259 psi 226 Psi 345 be
0130
0430
300
4.50
W.O.
A
1
IS
Bleed bring for 15 minutes and shut In for 30 min.
Time Tube A-Anrarks B-Aamulus Comments
DIAS 64 pal 1120 220 pal Bled 57 bbls of 7.5ppg in 15 minutes
G2:15 150 psi 180 psi 280 psi pressure ager 30 minutes area in
0230 18 psi 126 pad n5p. Sled 11 table of 7.5 ppg in 15 min
03:00 39 psi 180 One 240 psi pleasure Offer 30 minutes and in
03:15 5per 162 pat 245 psi Sled lO bids of 7.5 ppg In 15 mimaee
IK.OD 5 pal 151 psi 245 psi pressure after 30 minutes shut in
04:15 Spat 148 psi 245 psi Bled O Otale in 15 minutes
04:30
0900
4.50
900
W.O.
A
1
P
Blow down Mind /las and rig up on A -Annulus to bleed.
Tine Tube A -Annulus B -Annulus Comment
05:00 0 psi 142 psi 240 psi Stein pressure
05:15 -] psi 17 pat 240 pai 31 Obis bled of 6.8 ppg fluid
Sege Opel 62 pat 210psi and in pressure
WAS Opt 17 psi 190 pa Mail 26 bible of g.] ppg fluid
WAS Goal 23 W1 200 OR Shut in pressure
0]:01) A par 4 psi 200 psi Bled it bbls of 67 ppg fluid
07:45 2 psi 12 pal 200 pat Smut in pleasure
08:00 3 be 2 psl 200 pal ailed 5 Wild of 6.7 ppg fluid
S&S" -2 pai 5 pat 200 fled Shut in pressure
08:45 -2 pal 3ped 200 psi Shed O Safe of fluid
0 9:00
0090
15 00
2400
W.O.
A
2
P
Cantinas tp prepare r rg move, aloes dawn tiger tank lines and serum well. Rig down mud pump fines. Prepare W me esdg.
Empty pits ad blow down Ilnes. Sten removal of flmm on aasl side. Move pumples. ask dg floor. Move suit cases. Ley out
IineraM mat boaMs. Prepare orb move plls awfrom sub. Mosub d o
ry, ve off well amove no well 81,06 Move pits Into
poaigan. SW rg floor. Sin nggOr9 uD been. Sten N up inmpnneds.
te
Gas Readings
Avg Background Gas I%1
Mex Background Gas 1%)
Avg Connection Gas (%) Max Connection Gas I%)
Avg DNI/ Gas (%)
Max Dm. Gas (%)
Avg Trip Gas 1%) Mar Trip Ga. I%)
Cumulative Mud Volumes
Active Volume(bd) Hole Volume OMI) Addifions(bhn Gam Additions(bb) Losses@bl) Cum Loesea(bbp
Daily Contacts
Pasban
Contact Name
Company
Titia
Small
Offke
Mobile
Enirepredenbtke
Impose 9monson
OrilOrg Supv.
sitldrillingQgenipeiroleum cum
8mEe5A]15
End iopresentalive
Mike Gmbb
Em
Orilling Supv.
wddnlltng0$entpeuoleom.com
9m-6859]15
Ek repreaenbtive
Milch Billingkn
jeno I
EM
Rig Clerk
AKRgClerksDoyonl5@enipetm1eum.
907-685-0]22
Ent repredantalive
Merle Hubkf
EM
HSE
cum
Well Name: SP05-FN7 OR
Wellbore Name: SP05-FN7
Well Code: 26944
Job: WORKOVER
WCER Level:
Daily Report
Date: 11/112018
Report #: 3
Page: 2 of 2
Daily Contacts
PosMon
Contact Name
Company
Title
I Email
I rem.-
IMobile
Per mpmsenulhe
David Leonard
en,
HSE
Tool Push
Sam Dye
Doyon DrOing
Field Superintendent
Tool Push
Justin Heys
Dayton Drilling
Tool Pusher
rg15®doyond1ging.esm
Tool Push
Ryan Pankentz
Doyon DrilFng
Tour Pusher
rglSWdoyonddllhp.com
Tool Push
Cliff Owens
Doyon Drilling
HSE
rowans@dayonarille,cam
685-0]9fi
Tool Push
Smtt Simmons
Doyon Drilling
HSE
Personnel Log (POB)
Company
Sam. Type
Work H (hr)
Sund4sy N (hr)
Count
Note
ARRC
cuh
1250
l
Drilling
ASRC
SOA
12.50
1
SID Support
ASRC
Cone Atlelsor
12.0
1
SID Support
Baawn
Medic
12.0
1
SID Support
Dayon
Field Superintendent
12.50
1
Delle,
MI Swaco
Mud Plant
12.50
1
Drilling
Northam 011leiM Senate.
Feder
12.50
1
SID Support
HaOibudon
Mud loggers
12.0
1
get,
ACS
Enviromenul
12.50
2
SIDSupport
ASRC
Co.,, Man
12.0
2
Drilling
Baecon
HSE
12.0
2
SID Support
Doyon
Taalpushers
12.50
2
DrIIIMg
Doyon
HSE
12.50
2
Drilling
UNIe Red Services
Pumping
12.0
2
SID Support
Video Gray
Wellhead
12.0
2
Ddgiog
GBR
Casing Service
12.50
2
Dulling
ASRC
Logistic
12.50
4
SID Support
Ml Senses
WIF
12.0
4
SID Support
Baker Hughes
Baker Hughes CenbillX
12.0
5
Dosing
Purcell
ascent,
12.50
5
SID Support
Jacobs
T.kd.r/Cmneopamtor
12.50
10
Drilling
ESS
Catering12.0
10
SID Support
Do,on
Rig Personnel
12.0
22
Drising Total Drilling Personnel 5l
BOP Stack 6 Components
Description
Btarc nate
Leat Certatanon Date %assure Rating (psi)
Type Make Motlel
ID Nom (Int
P Range (purl Last Cert Data
Slow Circulation Rates
Pump Number: Make:
Mco l:
Stan Data End Date
Liner Size lie)
Volume Per Stroke Override(bbl/sdk) Maz Pro asure, (psi)
Date Depth(bKa1
Sloen Spd
smokes(spm)
P(pai)
ENI%)
OFlow(norm
Daily Bulk
Supply Item Description: Equipment Fuel
Unit Label:
Gel
Unit Size: t
Note:
Date Consumetl Recelvetl
ReWnmd
Cum Consumetl Cum Recelvetl
Cum Returned Cum Onlac No[e
11/1/2018 1,4880 19680
2,543.0
12,5430
0.0
no
Supply lura Dasgrcptipn: Mud Punt Boiurs
Untt Label:
Gel
Unit Size:
Node:
Date Consumed RecNved
Returned
Cum Consumetl Cum Receivetl
Co.
ReWmetl Cum On La Note
11/1/2018 42.0 42.0
84-0
84.0
DO
0.0
supplyltem assumption, Rig Fuel
UMt Label:
pal us
Unit Size:I
Note:
Oau Consumed Receivetl
Returnetl
Cum Conaumetl Cum Receivetl
Co. Returned Cum On Loc Note
11/12018 tp6]0 1.518.0
3,1fi0.0
10,4410
0.0
],281.0
Supply Item Description: kg Waur
Unit Label:
bat
Unid Size:1
Note:
Oma Oo erred Recelvetl
Retained Cum Consumed Cum Receivetl
Cum Returned Cum On Lee Note
ttll/2018 940 0,0
12].0
12].0
Bo
00
Supply Item Oescdptlon: WIF Boilers
Unit Label:
Gel
Unit Size:
Note:
Oau Consumetl
Recelvetl
Retumetl
Catm Consumetl Cum Recelvetl
Cum
Returned Cum On Loc Note
11/12018 7980
198.0
398.0
398.0
0.0
0.0
supply tum Descrip[lon: WIF Intent
Diesel
Unit Label:
Gal
Unit size:
Note:
Dah Consumetl
Received
ReWmetl
Cum Consumetl Cum Recelvetl
Cum ReWrneO Cum On Loc
Note
11(112018 0.0
0.0
]16.0
]740
0.0
0.0
Last Authority Visit
Data Tot inti. Nbr Tote I.N.C. number Comment
STOP Cards Submarea
Company
9Rone
Com
Doyon Dnlgng
5
PJSM'
Doyon Dulling Inc.
9
Sate cams
Doyon Drilling Inc
5
HRWS
Doyon Drilling Inc.
5
COY
Mi Swaco
4
MRC/JSA
Ml Swaco
4
RIR.
General Notes
Comment.
Well Name:N7 OR
Wellbore Name: e: SP?POS-FNFN7
Well Code: 26944
Job: WORKOVER
ani WCERLevel:
Daily Report
Date: 11/2/2018
Report #: 4
Page: 1 of 2
Well Header
Pemduconcesslon N° Operator Subsidies, Initial Lahee Code
ALASKA ENI PETROLEUM ENI Petroleum Co. Inc. DEVELOPMENT WELL
Ril Table Elevation (A) Water Depth (it) First Flange D) RKB-Base Flange (ft) RKB -Tubing Spoal (N)
5362 0.00 18.9] 3665 31]4
Rigs
Me Name Contradpr Rlg Type RIB Num Rla $tan Dere Rlg Release Date
RIG 15 DOTON LAND RIG W23 1225201]
Daily informa#on
Wea01w Temperature (°F) Wind Days LTI (days) ys RI (days) PDB
Cloudy WC 15' 26.9 SW 10 MPH 340.00 Pool 05D
zxanny Incidents - Near Miss
new Category Type Subtype SevefBy Cause Lost time?
Comment
Safety Drills
Days UnVI Next Check
Type
NOccur
Last Date
Next Dam
(tlays)
Man Down Dtlll
1
HI2I2018
113112018
90
Rg Inspeclwn
4 1122018
11212010
1
Sanity Meeting
4 1122018
1113/201a
1
iT Rg Evacuation 0.A]
1 1013112016
11292018
88
Casings seat
Cas.Type
OD (in)
to (in)
Grade
To. HNIM
I on.-1NKB)
ITVD Bot INKS)
Run Dam
CONDUCTOR
160.0
1600
/2 it
CASING
1318
12.42
L-80
-0.1
3,809.0
2,452.5
:1.11.
i&192012
CASING
9 L8
8.84
L-80
0.1
11.989.0
3,995.0
12!!02012
LINER
512
4.95
L-00
11,]11.0
2'8]5.0
3,901.0
111]2013
LINER
312
20.816.6
20,6>3.0
3,901.4
5/!2014
Last Cementing
Cementing Start Dam: W12014 String: LINER, 20,6]S.We Comment 35" X 5.s liner han erl packer set houde 5.Y liner. TO liner @ 20,618', Dim of Mat shoe @ 20,673'.
Stga Top (kKB)
Top Meas Me[h BM (RKB) Com
1 20,618.010.1313,138
Teat lines to 3500 psi. SLB pump 2 hots 10 5a MudPush, 25 bbis 15.84 cement drop 5' wlPor a1,1 h I5
1. MutlPush and ng displace w/ 184 bible slick wage, Sthg into liner packer and squeeze cement w143 bb,s of stick
ander. CIP @ 1010 his.
Job In/ormation
Job Phase anrmd ren Data Start Dare End Dare P50 Duration (days)
WORKOVER 1ay30201s 18:00 1013020101800 0.00
Daily Summary Operations
24h Forecast
Finish nippling up Blip's. Test SOPS - Rig down test equipment Rig up to decomplale. Pull tubing hanger and shin pulling tubing.
24h Summary
Connotes, dg up and rig acceptance. Nipple down tree. Nibbling up BOP'S. Start loading drill pipe in pipe shed.
Operation at 01.00
Tem, BOP..'
Time Log
Stan EM
Co. Our
Time Time
our aid
gal
Phase
On,
Act.
Plan
O"n. cr.
0000 O6 00
600
6.00
W.O.
A
2
77—
Spat 03 mud pump and to Ri
flow. Rig up pressure mud line to rg floor, Moke line to floor,
In
and gas buster va d- lbsteam
bleeder hose, Cow line and gas buster vent Install roof covers on pipe shed.
on ed
0600 1030
4.50
1050
W-0—
A
2
P
ing Group and VFD hawse. Spot mmngs box. VFD house. Pipe she ramp and Halliburton mud
logger shesuit es
loggw shack Make up suit case lines to sub. Prepare pits for fluid. Rig up interconnects to sub and pump so, Plug In
electrical unon shack.
b W mud amp add Hatfiaggressor
103p 12:00
1 50
1200.
W.O.
C
5
P
w
wire line valve and Nb an Vee, Tubing and AAnnulus on a vacuum B -Annulus 160 psi. Instal BPV. RIg tlown
land 1
Noon lay tlown valve and lubricator,
ator,
a 10:30 AM.
Notalrgsed"ad
1200 1430
2.50
14.M
W.
5
P
Nipple Prepare
Vee. Prean hanger, cap and terminate linea, install Dela.
g
1430 0000
9.50
24M
W.
C
5
P
up Fixed and seig
Nipple up RNw antl P snick. Nipple up ooshi liana, prtmery and secontlary choke and kill lines
lines, bane in
H2SFirlsh&loading
pini. Loatling S doll pipe In shed Sletl to dnfl, slurp and hilty tlRl pipe. HalliOurton tested gas as,ema H2S 8 LEL (good). Rig
up emdncaI cables for top drtve VFD house.
Gas Readings
Avg Background Gas 1%)
Max Background Gas (%)
An Connection Gas � h)
Max Connection Gas tib)
Avg or", -Gas(%)
Max.1.11 Gas(%)
Avg Trip Gas I%)
Max Trip Gas I%)
Cumulative Mud Volumes
Active Volume (w) Hoe Volume(bbl) Ablition,(bon) Cum Actions (bbl) lies (w) cum Losses(bbp
Daily Contacts
Position
Contact Name
Commonly
Tile
EmHI
office Moale
Eni repmsentetive
Broca Briancon
nI
GtlPng Suba
aiddn„hiq@eniatrDleum.cam
90]-685-0]15
Eni repmselda0ve
Mike Grubb
Em
Drilling Supv
aMdnlling,itendetros,um corn
90]-605-0]15
Eni reprosentative
Mitch Billington
End
Rig Clark
AKRIgC,eNSDawn15®enipetroleum.
907-685-0122
Eni reprasonhillve
Mad dealer
Eni
HSE
Ertl represenhi(e
David Leotard
Eni
HSE
Tool Push
Sam Dye
Doyon Doll,
Field Superintendent
Tool Push
Justin Hays
Doyen Doling
Too, Pusher
rgl5@doy mdnlliig.mm
Taal Push
Ryan Plateau
Down Drilling
Tour Pusher
0915®downddlling.com
Tool Push
Cliff Owns
Dayan Drilling
HSE
cowensfltdowndnOmgeom
605-0796
Taal Push
Scott Simmons
Doyon Dedfing
HSE
Personnel Log (POB)
Company
Serv. Type
Work H or)
I Sland4ly H(hr)
Could
Note
A RC
Clerk
@.50
1
Dnllinp
ASRO
SOA
1250
i
SID Support
ASRC
Crone Adwam
12.50
1
SID Support
Beacon
Medic
12.50
1
SID Support
Well Name: SP05-FN7 OR
Wellbore Name: SP05-FN7
Well Code: 26944
Job: WORKOVER
WCER Level:
Daily Report
Date: 11/2/2018
Report #: 4
Page: 2 of 2
Personnel Log (POB)
Company
Sears. Type
Work H (m)
Staral H (hr)
Count
NOW
Wynn
Field Superintendent
12.50
1
Drilling
Northern 00fuld Servica s
Fueler
12.50
1
SID Support
HOIIWOW.
Mud kggers
12.50
1
Drilling
ACS
Envimmental
12.50
2
SID Support
ASRC
Company Man
12.50
2
Drilling
Beacon
HSE
12.50
2
SIDSupport
Wyon
Toolpusbers
12.50
2
Drilling
Doyon
HSE
12.60
2
Drilling
Little Red Services
Pumping
12.50
2
SID Support
MI Svaco
Mud Plum
12.50
2
Drill,
thinks, only
Wellhead12.50
2
Drilling
GBR
Casing S.".12.50
2
Drilling
ASRC
Logistic
12.50
4
SID Support
MI SWaco
WIF
12.50
4
SID Support
Baker Hughes
Baker Hughes CentuliR
12.5)
5
Drying
Purcell
Security
12.50
5
SIDSupptod
Jacobs
TmNc driver/Creme operator
12.50
10
Drilling
ESS
Coledng
12.50
10
SID Support
Wyton
Rig Personnel 1
12.50
1
22
Difihng_Tolal Drilling Personnel 52
BOP Stack 8 omponents
Description
Start Data
Last Certification Date Pressure Rating (psi)
Type
Make Martel
I
ID No. [Ind
PRange Wail Last Cart Daft
Slow Circulation Rates
Pump Number. Make:
Model:
StaN DatEntl Date
Liner Sirn Qnl
Volume Per Stroke Overcitle (bbgslk) Mar Pressure (ps)
Data DepIN INRBI
Slog Spa
Strokes leper)
P(Pal)
EH(%) 0Fl. (gpm)
Daily Bulk
Supply Item Description: Equipment Fuel
Unit Label:
GAI
unit size: 1
Note:
Date Consumetl Recelved
Returnetl
Cum Consumed
Cum Re setend
Cum Returned
Cu. On Lac Note
1122018 1,2220 1,2220
3,]650
0
00
0.0
Supply Item Wscdption: Mud Plant Beilen
Unit Label:
Gal
Unit size:
Note:
Date Consumed Ramived
Returned
Cum Consumed
Gum Recelvetl
Cum RNurnetl
Lum On Loc Note
1122018 420 42.0
126.0
126.0
0.0
00
Supply Item Description: Wg FUN
unit lapel:
gal us
Unit Size:1
NOW:
Data Consumed Recelvetl
Rammed
Cum Consumed
Cum Received
Cum Returned
Cum On Loc Nofe
11)/2018 isOT.O 0.0
a,882.0
10,4410
0.0
5,7]5.0
Supply Item Description: Rig Water
UasLaber,
bbl
Unit suc;1
Note:
Dale Consumetl Recelved
Returnetl
CO. Consumed
Cum Receivetl
Cum Returnetl
Cum On Los Note
11)/2018 5.0 2]00
1320
397.0
0.0
265.0
Supply Ilan Wseripoor, WIFBoners
UNt LabN:
Gal
Unit Size:
Note'
Wle Consumed astly, adReturned
Cu. Communist
Lum Received
Cum Returned
Cum On Loc Nom
1122018 1980 195.0
594.0
594.0
0.0
00
Supply Rem Das."Pi WIF lnjedetl Diesel
Unit Label:
Gal
Unit Size:
Note:
Date Consumed Received
RNUInetl
Cum Consumed
Cum Resolved
Cum Returned
Cum On Loc Note
1122018 420.0 4204
1,134.0
1,134.0
0.0
0.0
Last Authority Visit
Data Tot map, Nbr Total I.N.O. number Cammmt
STOP Cards Submitted
Company
# Npb
cern
Wyton DNllilg
6
PJSM'S
Dayton Drilling Inc,
14
Sale Cards
Doyon Drilling Inc.
6
COW
Doyon Calling Inc.
5
HRWS
Ml S.
4
HARCIJSA
Ml Swaca
4
RIR'e
General Notes
Comment:
Well Name:S-FN7 OR
Wellbore Name: e: SPO6-FNFN7
Well Code: 26944
��n e' Job: WORKOVER
II Il0 WCER Level:
Daily Report
Date: 11/3/2019
Report #: 5
Page: 1 of 3
Well Header
PermlVGoncession N° Operator Suhsidlary Initial LaM1eeCMe
ALASKA ENI PETROLEUM ENIPetroleua Co. Inc. pEVELO'a WELL
Rotary Table Elevation (ft) Waley Depth (k) First Flange (ft) RKB - Base Flange(It) RKB- Tubing Spool in,
53.62 0.00 16.9] 31 3134
Rigs
Rig Nam. Conhactw Rig Type Rig Num Rig Smrc Cam Rig Release Dam
RIG 15 DDYON LUNO RIG 0723 1&262017
Daily Information
Weather Tempest amI'F) Windpays LTl idrysl Days Rl'days, POB
Cloudy WC 1° 22.4 INE @30 MPH 341.00 34100 050
Safety Incidents - Near Miss
Dam cmagoy Type subtype sm.erltY Cause Lost Mani
Comment
Safety Drills
Days Until Next Check
Type N Duce
Last Date
Next Date
(days)
Aulhodry Visit 1 1113/2018
111102010
7
Man Down Drill 1 1122018
11312019
89
Rig Inspection 5 11/3/2018
11/42018
1
Safety Meeting 5 11=018
11/42018
1
Spill Drill 1 110201:
11/42018
1
TT Kink While Tripping 1 11/32018
11/42018
1
TT Rig Evacuation Wt) 1 10/312018
12912019
0]
Casings seat
Cas. Type
Do (in)
IC pni
Grade
Tacit
I Bodom(ft.A;
I TVD one 1.161
1Run Dntr
C NDUCTOR
160.0
180.0
1/12011
CASING
133/8
12.42
L-60
-0.1
3,9W.0
2.452.5
12/192012
CASING
9518
8.84
L-80
0.1
11,989.0
3,995.0
12/302012
LINER
512
4.95
L-00
117710
20,6750
3,9010
1/172013
LINER
312
20.6168
20,8]30
3sme
5132014
Last Cementing
Cementing Sort Date: 5212014 Sheath: LINER, 20, B Dgnment 3.5" X 5.5"liner hanger/ packer set inside 5.5" liner. TO liner @ 20.616, blm of float shoe @ 20.673'.
S1gN Top IMKBk
Top Meas Med am INKeI Com
t 20,6180
20,6]3.0 SLB Test links to 3500 psi. SLS Pump 25 obis MEN Medi 25 one 15,811 cement, dap 5" wiper bell. 15 bbla
101 MudPush and dg displace w/ 184 Ibis slick Water Sling into liner packer and squeeze cement w143 bbls of slick
I
water. CIP @ 1010 his.
Job Information
Job Planned Start Datr Dam End Date P50. DOUG fdq )
KOV
WORKOVER 10130201810:00 10130201810'00 6,80
I=
Daily Summary Operations
24h Forecast
Finish laying dawn 4Y tubing and ESP wary. Pick up scraps and single r ham to 7,340. S18M back bull pipe and lay down scraper.
Lh Summary
Finish rg up BOPS. Test BOP's with both 4.5- and S' test joints. Rig up GBR and Baker. Pull tubing hanger. Pull 4.Y WMtg and ESP out of hale laying down tubing )/9785'.
0"e on at 07.00
Pulling out of hole with 4.5' 12,8 ppf Had 563 tubing @ 5,851' MD
Time Log
StanEnd
Cum Due
Time
Time
Dun fhrl
(hit)
Phos.
Opp
Act
Plan
Opef. Dough,
00:00
0200
2.00
2 00
W.O.
C
5
P
Continue to insmll Flow line. Install deer, hole fill line, di pan and drip pan cover. Center up sack.
02:00
05:30
3.50
5.50
w .
C
12
P
Function fast BOPS Insmfl testjoinh Hg up to test Fbod stack and Wmk air out dsyslem. Flcod mud ling and mud
manifold and lest Ifres to 3500 psi far 10 minumafgood test.
0530
15:OD
9 53
1500
W.O.
C
12
P
Test BOP uniu ment 25012500 psi: Test InAmula, choke mandold vanes 1,12,13,14, and 15. Demco valva t and 2. an
upper IBOP. Tini earthY lestpoint TOP pipe maN4.5' X 7- V9R), choke valves 8,10,11, HCR kill valves i and 2 and
lave( ISOP. Test #S- with W histjolM: Choke valves 67.9. manual MII valvas 1 and 2, and Tend valve. Test N4 -with 5° lest
join: HCR choke valves m i and 2, 5' Davalet. TaN5-w
t eh 5- fast joint 1 and 2 manual choke valves. Tat #6 -with S' text
joint: bottom pipe nams(3T X 6' VBR), choke manifold vanes 1 and! 2. Tatra SlUm s, choke valva 3 and 4. Test IdeA-
Remotely operated super choke tor 2 minutes, Tat NBBJ4amm* operated super choke for 2 min. Test N9 with 4- fast lolnl:
nnular and dartvane. Test #10 with 4.5 -test joint: upper pipe mmsi4Y X7'). FOSV
Test #11 With 4.5'tN tjoint lower pipe panni X 0° VBR). Perform Kcomey Draw down fast Starting pexaure 3OKI K
Madrad pmssure 1500 psi, after all mnctlons=2125 pal. 20D psi knees seconds, full recovery in 47 seconds. Nitrogen back
up -10 bones with 3500 psi average.
NOW: AO= Jeff Jona waned overran to BOP mal.
1500
16:30
1.50
1650
Wo.
C
15
P
Bow down surface Ones. Pull test jaknt and bfandng plug. Pull BPV. Pump 10 bola 9.6 pM brine per hour down annulus.
1630
19:30
3.00
1950.
WO
L
i
P
Rig up GBR won Volant CRT and Baker Center lift equlpmem. Pick up landing joint, make up to hanger and back out look
down bolts.
19:30
21:30
200
2150
W.
L
4
P
Sgi WUing Weight from IM k m 100 Is, Pull to 190 k and hand for 5 minutes and set down all seegM. Stage up A 10 k
per cycle and hold fee 5 arum and relesse weight. Hanger puked free at 210 k. UW=140K. DW=70k. Pull hanger to floor and
lay down and, joint and hanger
Note: found damage on hatpler false bank, vedmal acmtching and suchuffitg on e#erior Of telex bowl.
21:30
00:00
7.50
24 Oo
W O.
L
4
P
Continue, m pull out of hole with 4.5' 12.6 ppf 180" F/10,0]3' T/9)85'. Run ESP cable and cap tube lines war
shleves aM mnna'4 to the spools in de spMlh un0_ PU=130 k. A 8=
nnulus 180 psi. Pumped handle 90 bhls for last 24
Operation
from 00:00 to 06:00
Sod
End CO. Dur
Time
Time Our (he) @d Phase
Can ACL Plan Opei. Descr.
0000
04:00 4.00 28.00 W.O.
L 4 P Coni POOH & lay down 4.Y 12.6ppf L80 HYD 563 tubing f/9]85' V ]028', add 10 BPH 9 6 pp9 brine, found hole in tubing at
2263. F4I hole with 10 box per hour down back side.
04:00
04:30 0.50 2850 W.O.
L 9 P Started ciroulating tubing Mme of 101 bble. Pumping at 105 spm at 973 psi we seen returns to surface after 25 bbls.
Stopped pumping fluid.
0430
08:00 3.50 3200 W.O.
L 4 P Continue m lay down 45' 12.6 ppf Hyd 5631ubing FRO28' T/4 890 Pumping 5 ban down tubing every 30 min, starting at
5500' at 118 spm, 330 psi. Found hole in tubing in pup below top gas lift mandrel at 2263.]5' app. 1- long antl'/:' Wide (de
threads pn pup flan and were pomaded through over nation one side of de bottom), the hole and the conosign Were on OM
south aide Of tubing.
Gas Readings
Avg Background Gas 1 % I Max Background Gas (°6k Avg Connection Gas (%I
Max Connection Gas � hk
Avg Grill Gas i%I Max Dekl Gas (%i Avs Trip Ga. (%)
Max Trip Gas (%)
Well Name: SP05-FN7 OR
Wellbore Name: SP05-FN7
Well Code: 26944
Job: WORKOVER
WCER Level:
Daily Report
Date: 11/312018
Report #: 5
Page: 2 of 3
Daily Mud Volumes
Tanklgeeitlonli-oss TV"
Des
Volume(bMl
Tank gdlve Pih
Hole Hob
toss Fonnanpn
Cumulative Mud Volumes
Active Volume @M) HalVolume(bhp Additions(b60 Cum AJdRlons(bbl) Losses(bbl) Cum Losses (bbl)
0.0 0.0 00 0.0 0.0 210.5
Daily Contacts
Posebn
Contact Name
Company
Thin
Send
Office Mobile
Ent represenMWe
Bruce Simonson
Ent
Waling Supv.
siiddiing®enipeVoleumcom
90>-685-0715
Em representative
Mike Grubb
Ent
Drilling Supv.
siddrilkn
eurDayroleum.mm
90]-685-0715
Erie represemalNMuch
WilliamsWilliams
Enl
Rig Clerk
AKRigGeoksD0yon15®enipetroleum.
907-605-0722
Ent lapresenhMe
Man Hubbr
Ent
HSE
com
Ent representative
Steve Kolb
Ent
HSE
Tod Push
Sam D,
Devon DolOng
Field Superintendent
Test Push
Juatln Hays
Covert Ddling
Tool Pusher
rigi5@doyonddkng.mm
Tool Push
Ryan Radbatz
Doyon Drilling
Tour Pusher
rg15®doyonandula.mm
Tool PusM1
CIiROwem
Doyon On10ng
HSE
ena@aoronarinmg.mm
sfi5479a
Tool Pesn
s[pR Simmons
opypd Drimnq
HSE
Personnel Log (POB
Company
Set Type
Work Hleo
Summary H flan
Count
Note
ASR
Lien
12.50
1
Charnel
ASRC
SOA
1250
1
SID Supper)
ASRC
Crane Ativtsor
12.50
1
SID Supmrt
Beacon
Medic
12.50
1
SID Support
Cloyed
Field Superintendent
12.50
1
Drilling
Northern Carl Sentence
Faster
12.50
1
SID Support
ACS
Enviromental
12.50
2
SID Support
ASRC
Company Man
12.50
2
Mai,
Beacon
HSE
12.50
2
SID Support
Doyon
Toolpusbers
12.50
2
Dtlllbg
DOWn
HSE
1250
2
Drilling
Little Red Saint...
Pumping
12.50
2
SID Support
MI Siam
Mud Plant
12.50
2
Doing
Heated.
Mud began
1250
2
Drilling
Vetco Gray
Wellhead
12.50
2
Drilling
GBR
Castrg Servtm
1250
2
Dulling
ASRC
Logistic
12.50
3
SID Support
Ml Swam
WIF
12.50
4
SIDSuppod
Baker Hughes
Baker Hughes CenbAifi
12.50
5
Drilling
Prompt
Security
12.50
5
SID Support
Jambs
Truck driver l Crane operator
12.50
10
Wiling
ESS
Catering
1250
10
SID Support
Dayan
Pog Personnel
12.50
22
Orilling Total Drilling Personnel 53
BOP Stack 6 Components
Description Start Data Last Certification Date Pressure Rating (,I)
'You Make Motlel
ID N. (in) Is Range (psl) Last Cert Date
Slow Circulation Rates
Pump Number. Make: Motlel:
Start Data End Date Liner Size (I.)
Volume Per Stroke Gnonde(bblled) Max Pressure (,at)
Date Depth(NKB)
ISlow Spd Strok.a )spm) P(pai) Eff(°hl
0plans (gpm)
Daily Bulk
SupplylMn Des[dptlon: Equipment Fuel Unit Label:
Gal Unit Size: 1 Net.:
Date ad R.celvetl Returned
Cum Consumetl Cum Received cum Returned Cum On Lee Non
I..
111312010 12800 1280.0
5,045.0 5,045.0 00 DO
Supply Rem Description: MW Plant Speak Unit Label:
Gd at, bile: Note:
Data Co"I'm Received RaNrned
Cum Cproumetl Cum Receivetl Gum Relurrretl Cum On Loc Note
11/3/2018 42.0 42.0
1580 1(380 Do 0.0
Supply )tam Description: Pog Fuel Unit Label:
galus Udt Size: 1 Note:
Data Consumetl Procedure! Re rl.
Cum Contended Co. Receivetl Cum Returned Cum On Lm Note
11YS2018 1,]72.0 4,500.0
6034.0 14,9410 00 0,507.0
I I
Supply Rerrr Description: Rig Water Ude Label:
the Unit Stze: i Note:
Date Consumetl Receivetl Returned
Cum Consumetl Cum Reserved Cum Returned Cum On Lm NOM
11I3r2018 12.0 0.0
204.0 39].0 0.0 193.0
Supplylbem Descriptipm WIFBallas Unit Label:
Gel Unit Size: Noie'
Data Cornumed RecaNetl Returned Cum Consumed Cum Received Cum Returned Co. On Loc Nine
11I3I201a 198.01980 792.0 7920 00 0.0
Supply Non Deacriptame WIF Inleatod Dbeet Unit Label:
Gal Unit St.: Note:
Date Consumetl Received ReNmetl
Lum Consumetl Cum Cum Relurned Cum On Loc Nota
11rJ/2018 420.0 42e0
1,554.0 1,554.0 0.0 0.0
LastAurnorily VSjr
Data Tot las, later Total I.N.C. numberComment
1113/2018 BOP TezI A 0 G C C Jett Jones waivetl witness to BOP lad, esH test tlue 11/1012018
STOP Cards Submitted
Corrrpamv
It RP1e
Cpm
Doyon Drilling
5
PJSM'S
Doyon Dnlllng Inc.
6
Sale Cards
Doyon Drilling In.
5
HRWS
Doyon Dngng Inc.
5
COW
Ml Swam
6
HARCIJSA
MI Swam
4
RIR's
Well Name: SP05-FN7 OR
Wellbore Name: SP05-FN7
Well Code: 26944
Job: WORKOVER
WCER Level:
Daily Report
Date: 1 11312 01 8
Report M 5
Page: 3 of 3
Well Name:S
Wellbore Name: e: SP05-FNPOS-FN7
Well Code: 26944
�
yp Job: WORKOVER
lClllli WCER Level:
Daily Report
Date: 1114/2018
Report* 6
Page: 1 of 2
ll der
kfConcession N°
III
operator sub¢I ary Initial LaM1ee Code
Co
SKA
ENI PETROLEUM euro Co.lnc, pEVELObe.
ENI Petroleum WELL
ry Table Elevation(fl) Wanr Depm(R) Firs[Flange(fl) RKB-Bece Flange(RI RKB - Tubing Spool (it)
2 a M 36.fi5 31.]4
s
Name Clmeaemr Rlg Type Rig Num Rlg SpiN Dap Rig Ron. Dark
IG 15 DOYON LAND RIG 0]23 12/25201]
ly Information
ther Temperature l°F) Wind Days LTI(days) Days Rl(days) POB
r WC -12° 122 ENE its 29 MPH 312.00 36200 BSA
ety Incidents - Near Miss
R
Category Type Subtype Seminar Cause Lost time?
ment
ety Drills
Type
Days Goal Next Check
tlN Visit
#occur
Last Date
Next Data
(days)
1 111312018
1111012018
6
Down Drill
1 1122010
1/312019
68
spection
6 11/412018
11/52018
1
Y MeeXn9
6 111412018
111512018
1
Spill Drill
1 111112018
11/42010
0
TT Kick While Tripping
1 11/32018
11/42018
0
TT Rig Evacuation Drill
1 1013112018
12912019
B6
Casings seat
Cas.TYPe
CONDUCTOR
OD(in)
ID(Im
Gnde
Top (flNe)
Bo[tpn (RKB)
TVD BOG (flKB)
Run Dale
CASING
13&8
12.42 LE0
-0.1
ifi0.0
3,909.0
180.0
2,452.5
1112011
1111&2012
CASING
9518
8.84 LEO
04
119890
3,9950
12/30/2012
LINER
512
4.95 L-80
11,771.0
20,6]5.0
3,9010
1/1]2013
LINER
312
20,616.6
20,673.0
3,901.4
5"12014
Last Cementing
Cementing Start Date: 5(/2014 apple LINER. 20.6]3.Ofl Comment: 3.six 5.5° gnerhangerl packerset inside 5.5liner.TOkner@ 20818', him of Ooatshoe@20,673'.
Stg # Top (hKB) I Top Meas Mem Bim (MB) I Corn
t 20.6180
20,8]3. SLB Tesl tines io 3500 psi. SLB pump 25 bis 10.5# MudpUsh, 25 bila 15 8# cement, amP S wiper bell, 15 bbls
10.5#..'Z ch and ig displace w/ 184 bible slick water. Sting into liner pecker and squeeze cement w143 bilis of slick
Water op®1010 his
Job Information
Job PhasePlanneU Start Date start Data End Date P50 Duration (days)
WORKOVER
19730201818:00 10130201818W pop
Daily Summary Operations
Uh Forecast
Pick up 9518" spinster and single in hole to 11.730. POOH 0 stand back all pipe runt lay down acreper. Prepare and con USIT log.
Uh Summary
Finish IaVng down 4.5' completron FArripi . Rig down GBR and Baker equipment and clear Mor. Change out saver sub on top all
Operation at 07.00
Pick up and make up 5" dnti pipe and Ian in hole with 9 50'scnper @ 2,000' MO.
Time Log
spirt End Cum Our
Time Time Der tor) (li) Phase opr. Aur. Plan One,. Descr.
00.00 04:00 4.00 400 WC) L 4 p Cont POO B lay dawn 4.Y 12 fippf 180 HYD 563 tubng 09785' V 7028', add 10 BPH 96 ppg brie, found hole in tubing at
2263'. Fill M1de wXM1 10 bbl- Par hour down back side.
04:00 04:30 0.5 4c L 9P Slated circulabg tubing vWume p 101 bbls. ping al tll6 gpm al 973 plu we seen rebme to w ace altar 2 ODIs.
Stopped pumping fluid.
04:30 08:00 3 50 600 W.O. L 4 P ICotlXnue io lay down 43 12.6 ppl Hyd 563 loping F17028 1-14.890'. Pumping 5 bill, down tubing every W min, staring at
5500' at 118 gpm. 330 par. Found We in tubing In pup below top gn Ito mandrel at 228975' app. 1' long and W wide (me
darkness on pup pin and wen conaded through lower hall on core we of me Wants), the hole and the corrosion were an me
mine side of bil
0800 0900 1.00 9.00 W.O. L 5 P Change out most for cable in spooling ins.
0990 16:30 1.50 16.50 W.O. L 4 P Coraue chairman 4.5 12.6 opt Hyd 563 Ium, F14.890 EANY Continue m pump 9.6 ppg brine down out everlo
minute-, with -alums to su fil PI 58k
1630 1 D.50 1 OO W.O. 6 Perminate cap We at spire on lob,#1. Conficum b pull out at hole F1160 1102'Wri, Must total and X,0 pups to DGU.
7 20:110 3 OD 20.00 W.O. L 4 P Put pump axal out af r shroud and decomeete. Break M shroud and lay down. Continue to 011 We at 10 bph with no
rettep Speeda8y pampa=12. prose collar damps -249, Protespoliker tlampd4. all pito agppum, for. Smatl amount of
sign on gas di-ponlon tube and ESP hosing.
23:00 3.00 23 00 W.O. 5 P mtring ESP ebb aM cap tube line shieves. Clean and em, floorof decompleiron equipment Rig down BR equipment
and unload tubing from pipe shed. Continue n fill We at 10 bph wllh no retains.
00:97 100 2400 W.O. M 20 Is- ChcmJeold saver sub on lop drive to TT525. Serves Mpdrive and Mw works. Mop weer ring and running fool long Mm.
tas
Continue to 94 hole at 10 bph with no realms.
2fi0 bike d 96 ppg brine pumped into the We me last 24 hours.
eadings
AvgBackground Gas (°)
Max Background Gas (%) Avg Connection Gas I%)
Max Connection Gas (%)
Avg Drill Gas (%)
-Da
Max -Ix Gas I,) Avg Trip Gas (%)
Mak Trip Gas rs)
Py Mud Volumes
TanMAtldlitimiLses
Tank
Type
Des
Vplume(W)
drys Pils
62
Hole
Hole
1,104.2
Loss
Formation
2514
Cumulative Mud Volumes
Active Volume (bbl)C"
Volume flo l) Additimre (bil) Cum Additions. (bbl) Losses (ball Lum Losses (bbl)
1.7312 1,104.2 OO 00 2514 593.9
Daily Contacts
Positron
Conpip[Name
Company
Title
Email
ORke
Mobile
E -M reprecentalive
Bryce Simonton
Eni
Drilling Supv.
cidMllin enipetroleum coin
907E05-0]15
Eni representative
Mike Gibb
Eni
Orillin Su v.
9 p
siMdllio
g�enipeWloum.cam
907E850]15
Well Name: SP05-FN7 OR
Wellbore Name: SP05-FN7
Well Code: 26944
Job: WORKOVER
WCER Level:
Daily Report
Date: 11/4/2016
Report #: 6
Page: 2 of 2
Daily Contacts
Position
Contact Name
Company
Title
Email
Office
Mobile
Eni repreesntallve
MXA Billington
Eni
Rig Clerk
AKRigCIk,eDoyon15@edpeimleum.
907885-0722
nom
Em represeclaim
Mark RUN.
Em
HSE
Em representative
Steve Kdb
Em
HSE
Tool Push
Sam Dye
Doyon Doling
RUN Superintendent
Tool Push
Justin Hays
Doyon Drilling
Tool %.her
rig15®doycodrd11ng cam
Taal Push
Ryan Panimatz
Doyon Drilling
Tour Pusher
rigl5d5adoyondr Min9,com
Tool Push
CIMOwens
Dayan Drilling
HSE
coareared@aJoyondifffing com
605-0798
Tool Push
Seoul Simmons
Dcyon Dtllling
HSE
Personnel Log (POB)
Company
Sam.
Sam. Type
Work H(hr)
Suntl- H(N)
Coun[
Note
Little ell Services
drinking
0
ID upport
ASRC
Geek
12.50
1
Drilling
ASRC
SOA
12.50
1
BID Support
ASRC
Crane Ativisor
t250
1
SID Support
eeacen
Medic
12.50
1
SID Support
Doyon
Field Superintendent
12.50
1
Orillmg
Northern Oillegd Services
Fueler
12.50
1
SID Support
Vence Gray
imposed
12,50
1
Drilling
Ml Sven
Mud Engineer
12.50
1
Drilling
ACS
EnviromeMal
12.50
2
SID Support
ASRC
Company Man
12.50
2
Dri
Beacon
HSE
12.50
2
SID Support
Doyon
Tool pi shes
12.50
2
Drilling
Gotten
HSE
12.50
2
Drilling
MI Swann
Mud Plant
12.50
2
Crude,
Halliburton
Mud loggers
12.50
2
Drilling
GBR
Casing Service
12.50
3
Drilling
ASRC
Logistic
12.50
4
SID Support
Ml Based
WIF
12.50
4
SID Supporl
Baker Hughes
Baker Hughes CentrillX
12.50
5
Dtllling
Purcell
Security
12.50
5
SID Support
Jacobs
Truck driver I Crane operator12.59
10
Drilling
ESS
Catering
12.50
10
SID Support
Doyon
Rig Personnel
12.50
22
Dolling Total Dtllling Personne154
BOP Stack 8 Components
Uesariplion
Stert Date
Las' Certification Data Pressure Rating hasp
Type Make Model
ID No. 11.)
PRange (pat)
Last Cert Dat,
Slow Circulation Rates
Pump Number: Make:
Mudel-
Start Data End Dam
Liner Size (In)
Volume Per Stroke Override (bbllslk) Max Pressure (pei)
Date pepM (1X(B)
Slow Spot
Strokes(spm)
Phad)
EN(%) 0Flow (gpml
Daily Bulk
S"Upty ttcn Desedpit- Equipment Fuel
Unit label:
Gal
Unit Size: 1
Note:
Date L,morma C RecNved
Returned
Cum Coceumetl
Cum Rosalind
Cu.
Returned Cum On Loc Note
111412010 12050 1,2850
6,3100
6,310.0
0.0
00
Supply Item Condition: Mud Plant Boilers
Uftlt Labek
Gal
Unit Size:
Note:
Dain Consumed Rectived
Returned
Cum Component t
Cum Received
Cum
Returned Co. On Loc Note
11/42018 42.0 42.0
2100
210.0
00
0.0
Supply Ilei Descripudtp Mg Fuel
UnX Label:
gal us
Led Size: 1
now:
Data lConsomed I Received
Relumetl
Cum Consumetl
Gum Receivetl
Lum R¢Nrrcetl Cum On Lac Note
ii/d12018 2,0700 00
I 8,509.0
14,941'0
0.0
6.437.0
Supplyltem Descrip8on: urg Water
Unit Label:
out
Unit Size: i
Note:
Date Consumetl Received
Returned
Cum Consumetl
Cum Reoelved
Cu. Returned Cum On Loc Nole
11/42016 430 0.0
29].0
39].0
0.0
150.0
Supply Item Description: WIF boles
Urdt labs:
Gel
Unit Size:
Note:
Gale Consumed Receivatl
11//2016 1980 198.0
Returned
Cum Consumetl
990.0
Cum Received
990.0
Lum Returned Cum On Loc Note
locate
Supply Ron Desedpu m WIF lnlecwal
Diesel
unat Label:
Gal
Unit a,.:
Note:
0.t, Consumed
Ransom
Returned
Cum Cermumed
Lunn Received
Cum
Returned Cum On Lac Note
11/M201B 420.0
4200
1,9]4.0
1,8]4.0
0.0
0.0
Last AUtnonty Visit
Date Tut insp. Nat
Total I.N.C. number Comment
11rd2U18
BOP Test, AOGCC Jeff Jones waivetl witness
to SLIP test, ind test
do. 1111012918
TOP Cards SUnmltted
Company
XRpM
corn
Doyon Drilling
13
Rim
Gotten Drilling Inc.
10
Bine Cams
Gordo Drilling Inc.
13
COW
Doyon Delling Inc.
13
HRWS
MISwaco
4
HARC/JSA
Ml Swaco
4
WiTs
General Notes
Comment
Well Name:S-FN7 OR
Wellbore Name: e: SPO5-FNFN7
Well Code: 26944
Job: WORKOVER
eni WCER Level:
Daily Report
Date: 11/5/2018
Report #: 7
Page: 1 of 2
Well Header
PermdbConcession N°
Operator Subsidary Initial Lahee Code
ALASKA
ENI PETROLEUM ENI Petroleum Co. Ina DEVELOPMENT WELL
Rotary Table ElevaOon (fi) Water ..Pan (n) Float Flange(RI n.- Base Flange(B) RKB- Tubing agrees" UB
53.62 0.00 16.9] W(gr 3114
Rigs
Rig Name Contractor Rig Tyge Rig Num DaM1 Rig Release Date
j=Date
RIG 15 OOVON LAND RIG 083 12/25201]
Daily Information
Weather Temperature (°F) Wind Days LTI (days) Days RI (days) P8oe
MuCloudy WC -02° 114 E @ 33 MPH 343.00 34J.00 8.0
Safety Incidents - Near Miss
Date Category Type Subtype Severity Cause Lost time]
Comment
Safety Drills
Days Until Next Check
Type
aDccur
Last Date
Next Data
(days)
Authority Visit
1
11/3/2018
1111N2018
5
Fire Drill
f
11/42018
111182018
13
Kick While Tripping Dol
3
11/52018
lllIV2010
7
Man Down Drill
1
11/1/2018
11312019
87
Rig Illega on
7
1113/2010
1182018
1
Safety Meeting
7
11/3/2018
1182018
1
Spill Drill
1
1122018
11/42018
-1
TT Kick While Tripping
1
1182010
I IIQ2018
-1
TT Rg Evacuation Drift
1
10912018
129/2019
85
Casings seat
Cas. Type
00 ren)
ID (Int
Group
Too(frKS)
a.Bom IRKS)
I TVD BOL(NKBt
I Run DaM1
CONDUCTOR
160.0
160.0[.1.2.12
12011CAGING
13318
12.42
1-80
-0.1
3,90902,452.5
CASING
9518
8.84
L -Bo
0.f
11.
3,995.02/012012
LINER
5112
4.95
L-80
11,]]10
206]50
3,9D1.0/172013
LINER
3112
20,616.6
20,6]3.0
3801.4132014
Lasf Cementing
Dementing Start Date: W12014 agbing: MNER. 20,6730KKB Comm l 35" %5.5" liner hanger/ packer set inside 5.5- finer. TO -liner® 20,618, arm o oat shoe 20 W3'.
agtg N Top (BKBI Top Meas MetM1I
Bbn (()list
I Co.
f 20.618 0
20,6139
SLBTest lines to 0 psi LB pump 25 bine 10.. MMPua , 5 bbls 156%cement, drop V wiper ball. 15 able
1050 Mucoush and fig grainer w/ 184 bbls slick water. Sting into liner packer and squeeze cement w/ 43 bels of slick
I
water. CIP @ 1010 hon.
Job Information
Job Phase Plannetl SM1rt Deb SM1rt one End DAN P50 Duration (days)
WORKOVER 1N3020f818:00 10130201018:00 0.00
Daily Summary operations
2" Forecast
Pull out of hole with 9 SIB° scraper and stand back 5' drill pipe in tlenick. Pick up Renewal packer and run in hole and test 9 Spa' casing below depth of hole Net was found in tubing. Run SLB E -line and perform
celiper log with PDS tad and weIllec baiter.
24b Be...,
Pik up 9 518'scraper and single in hole to 11,738'. No excess drag. Pullout of hole standing back pipe in dinner F111.738'113,065'.
Eliminating at 07.00
Laying down redevabie lest paclar.
limo Log
Skirt End Cum Our
Time Time Dur @r) (fir) Phase I Opr. Act. Plan Open Descr.
7003 0400 400 4.00 W.O. M 5 P Continua to Install TT525 saver sub an tap drive, kit l wear rang, rig down sheaves from derrick. Put elephant Mac away
and remove than in front of spooling ung.
-18:30
Moo 14.50 is so W.O. M 4 P Makeup 9 W scraper BHA, pickup 5 TT525 dill pipe from pipe shed and single in hole T111,738wall ria excees drag.
1830 1900 0.50 1-900 W.O. M 9 P Make up sting and pump 25 bbls of 9.6 ppg brine down pipe at 3 Orem. Reforms at surface diverted d whn, box. With
pumps off fluid level dropping blow down top drive.
19:00 20:30 1.50 20.50 W.O. M 4 P Pull out of hits wail 9 SB° steeper on 5° all pipe F111J38' Ti Racking back stands of pipe m deckle. Filing hole set
pipe displacement with no Mums. PU=185k, SOFelft
2030 2100 D50 2100 W.O. M 25 P Service rig. Lp Us cables ontop drivgdem ice form dedcic
21:00 00:00 3.00 24.00 W.O. M 4 P Canine pulling out of Mle with atom assembly on 5° dill Fipe PA. 124' Tp3,OB5' racking back drill pipe In defifick Pumping
9.6 ppg brine for pipe displarement ail m reNms. PU=105k. SOegSk. Normal dreg on trip with no over puff.
94 this of 9.6 pipe brume pumped In hale the lag 24 Mum.
Gas Readings
Avg Background Gas (%1
Max Background Gas (%) Avg Connection Gas 1%) Mea Connection Gas 1%t
Avg Drill Gas (%)Max
Drill Gas (1) Avg Trip Gas (%) Mas Trip Gas (%)
Daily Mud Volumes
TenMAdditiodloss
Type
Des
Volume(bi
Tank
gdive PIIS
591 0
Hole
Hole
1064.0
Loss
Formation
168.1
Cumulative Mud Volumes
ACOve Volume (bbl) Hole Volume (hi) Additions (bap Cum Adtlitions (bbl) Losses (bap Cum Losses (big
1 675 1,084.0 0C 0.0 1 168.1 862.0
Daily Contacts
Position
Contact Name
Company
Tied
Email
Office
Mobile
End representative
Brucensa n
End
Done, So,
sdddrimg enlpeWleumLom
907-685-0715
Ernrepresermitive
Mike Gmbh
Eal
Drilling SUPv.
adddnng@ampelMeum.wm
90]-685-0715
Ed mgese t.e
MiICM1 Billington
Ed
Rig Clerk
AKRIgQermDoyonl NESmiretroneum.
cone
907-685-0722
Em repregarammwe
Mark Hubler
End
HSE
End representaMa
Steve Kolb
Em
HSE
Tool Push
Sam Dye
Doyon Drilling
Field Superintendent
Well Name: SP05-FN7 OR
Wellbore Name: SP05-FN7
Well Code: 26944
Job: WORKOVER
WCER Level:
Daily Report
Date: 11/512018
Report #: 7
Page: 2 of 2
Daily Contacts
Position
Contact Name
Company
Title
Email
Office Mobile
Tool Push
Justin Hays
Doyon onlnna
Tool rainerryts�tloronadllmg.com
Tool Push
Ryan PanlvaU
Doyon DNlli�g
Tour Pusher
rg15®dorondrilling cum
Tool Push
CIM Owens
Doyon Drilling
ME
cravens@doyondrillinecem
685-0798
Tool Push
SmU Sknmona
poyan DMling
ME
Personnel Log (POB)
Company
Sam. Type
Work H(hr)
Standby H(hN
Court
Note
ASRC
eR
12.50
1
Dnllmg
ASRC
SOA
12.50
1
SID Support
ASRC
Crane AMlsor
12.50
1
SID Support
Beacon
11
12.50
1
SIDSupport
Doyon
Field Superintendent
12.50
1
Drilling
Nodhem Oiffid Services
Fueler
12.50
1
$ID Support
Vence Gray
Weltread
12.50
1
Boiling
MI Sworn
Mud Engineer
12.50
1
Driving
FDS
Caliper logging
12.50
1
Drilling
ACS
Envbomental
12.50
2
SID Supped
ASRC
Company Man
12.50
2
Drilling
Baker Hughes
Baker Hughes CenmMt
12.50
2
Dribing
Beacon
ME
12.50
2
SIDSuppod
Doyon
Tool pushers
12.50
2
Drilling
Doyon
ME
12.50
2
Drilling
MI Sam.
Mud Plant
1250
2
Drilling
Hallibudon
Mud "mrs
12.50
2
Drilling
Well -Tec
Trader Service
12.50
2
Dtllling
GBR
Casing Service
12.50
3
Drilling
SLB
E4ne
12.50
3
Drilling
ASRC
Logistic12.50
4
SIDSuppat
Ml Sworn
WIF
12.504
SID Support
Purcell
S ... My
2. go
5
SIDSuppod
Jacobs
Truck diner/Crane operator
12.50
10
Drilling
ESS
Catering
12.50
10
SIDSupport
Doyon
It Personnel
12.50
22
Onl0g_Total Drilling Personnel 57
BOP Stack Components
DescHph.n
Start Data Lasl LertlMation Dea pressure Rating Ipso
Type Make Model
IDNam(in)
PRange (pail Last Cert Date
View Cimulation Rates
Pump Number: Make:
Madel;
Shrt Cam End Out.
Liner Size (in)
Volume Per Stooke 0,runme IbbI Mea Pressure(pai)
Date OeptM1 lflaB)
Slow Sptl
Spoken,(apm)
I Is (Pat)
I ER1%) OFIBw (gpm)
Daily Bulk
Supply been Descdptlon: Equipment Fuel
Unit Label:
Gal
U.1 Size: 1
Note:
Date Consumetl Recelvetl
Returned
WmCansumetl
Cum Recaivetl
Cum Returnetl Cum On Loc Note
it/5I20te 1,131.0 1.131.0
7,441.0
7,4410
0.0 0.0
Supply Item Oeacriptlon: Mud Plant Boilarm
than, Label:
Gai
Unit Size:
Note:
Date Consumed Recaivetl
Returned
Lum Consumetl
Cum Received
Cum Returned Cum On Loc Note
11/52018 q2.o 42.0
252.0
252.0
00 11.0
Supp Item Dattdpdon: Nig Fuel
unit Labebgal
us
unitanr:I
Note:
Cah Consumed Recelvetl
Returned
Cum
Cum Received
Lum Returnetl Cum On Loc Note
11/52018 ]1790 3,825.0
3C7upmetl
10,603.0
10,566.0
00 7,0830
Supply Item Oesoriptien: MITI
Unit Label:
bbl
Unit Size: t
Note:
Date Consumetl Received
Returned
Cum Consumed
Cum Received
Cum Returned Cum On 1pc Nate
t V52o18 550 135.0
302.0
532.0
00 230.0
Supply Item Description: WIF Bollen:
Unit Label:
Gal
Unit Size:
Note:
Date ConcumaU ped
Returned Cum Consumetl
Cum ReceNetl
Lum Returned Cum On Loc Note
IN
111512018 1980 198.9
1,108.0
1,188.0
00 0.0
Supply limn Description: WIF lnjectetl Diesel
Untt Label:
Gel
Unit Size:
Note:
Data lConsermed iRso.hied
Returned
Cum Consumetl
Cum Recaivetl
Cum Returned Lum On Loc Note
11152018 420.0 4208
2,394.0
2,394.0
0.0 p.0
Last Authority Visit
Date Tot insR Nor Total I.N.C. number Comment
it/31Z018
BOP Test, AOGCC JeD Jones waived wNresa 1p BOP lest, neat teal due 1111012018
STOP Cards Submitted
CnnPany
d"
Coln
Doyon Drilling
8
PJSM'S
Doyon Dulling Inc.
18
Salle Cards
Doyon Drilling Inc.
8
COW
Doyon Drilling Inc.
8
HRWS
Ml Swece
4
HARC/JSA
MI Swaco
4
RIR's
General Notes
Comment:
Well Name: SP05-FN7 OR
Iilllkl(Q Wellbore Name: SP05-FN7
Well Code: 26944
r�r�1'l Job: WORKOVER
DCII II II WCER Level:
Daily Report
Date: 11/6/2018
ReportM: 8
Page: 1 of 2
Well Header
Pennate no ..led N. Operator Subsidiary Initial laM1ee Code
ALASKq ENI PETROLEUM ENI Potroleum Co. Inc DEVELOPMENT WELL
Rotary Teton....an,, Water DapM ml First Flange IN) RKB.Base Flange (N) RKB.Tubin95pool (g)
53.62 0.00 16.97 36.fi5 31 ]4
Rigs
Rig Name ContraIXa Rlg Type Rig Num Rig Start Data Rig Release Doo
RIG 15 DOYON IANC RIG OY23 12/23201]
Daily Innermation
WwMer Temperature (°F) Who Days LTI (drys) Day. RI (days) POB
Mostly CWudy WC -2' 17.6 E@22 MPH 344.00 314.00 05.0
Salety incidents - Near Miss
Date Cate9ory TYPe SubryPe Severity Cause Lost time?
Comment
Safety Drills
Days U ul Next Check
Typs
aoccur
Last Date
Next Date
(day.)
AuthontyVisit
1
1102018
((/1012018
4
Fire Drill
1
11/42010
111182018
12
Kick While TnpWW Dnll
3
111512018
11/12/2018
6
We Down Gid
1
11r212018
11312019
86
Rg inspection
B
11/6/2018
11912018
1
safety Meaning
8
1152010
1192018
1
SPH Dell
1
111312018
11M2018
2
TT Kick While drilling
1
11/8/2018
1192018
1
TT Kick While Tripping
1
1102018
11/02018
.2
TT Man Down Drill
1
115/2018
119/2018
1
TT Rig Evacuation Gill
1
1013112018
1292019
84
Casings seat
Cas. Type
OD (in)
ID In)
Gratle
Top (ftK8)
Bottom (RKBI
TVD ad. (NKB)
Run Data
ONDUCTOR
1600
1fi00
t/1/ZOO
CASING
13318
12.42
L40
-0.1
3,9090
2052.5
12/192012
CASING9518
8.84
L-80
0.1
11,9890
3,9950
12302012
LINER
512
4.95
L-80
11.771.0
2DRS0
3.901.0
11172013
LINER
3112
20,616.61
20.673A
3.901.4
5132014
Last Cementing
Cementing StartData: 5/]2014 Stang: LINER. 20.fi]3.OhK8 Cmnment 3.5" K 5.5" liner hargerl packer set inside 5.5" Imer. TO liner W 2D,618%tern of float she, @ 20,673'.
Stgp Top (ftKel Top Meas Mem Bhn (mcel Cpm
1 20,6180
20.8]3.0
SLB Tast lines to 3500 psi. SLB pump 25 bus 10 5s tantrum, 25 bhb 15.80 cement, dmp 5- wiper ball. 15 bbl.
10.30 MudPush and dg displace, wl 184 MUs stick water. Sling Into liner packer and squeeze cement w/ 43 this of slick
water. CIP 191010 his
Job Information
Jab Phase Panned Start Date StartDab End Data P50 Dora on (days)
WORKOVER f00d201810:00 10/30201818:00 0.00
Daily Summary Opendoons
240 Forecast
RV down and lay out e -line loots from caliper run. Load tubing in pipe shed Prepare to lest casing with retrievamanic and inflatable pack¢[ Prepare for casing Patch job.
2M Summary
Pull out of hole with 9 55'scmper and lay down. Pick up baker relnevamatic and mm In hole and test F2.216 W surface (good test). RIH to 2,308and rest to surface (lest hilt Pus out of hole and lay down parker.
WU and perform a camper log hem 11.703' to surface.
OWastion at 07.00
Loading tubing in pipe shed, dMing and shopping_
Time Log
Sort
EM
Cum Dur
Time
1!r:Dur
(M1r)
(M1r)
Phase
I Doc
Act.
Plan
ODirect..
00:00
0470
4.00
4.00
Wo,
M
4
P
Continue W ro W)I ollpf M1 F0, 'remdng back Mi pipper. e in demck Lay down scraper assembly Pick up and make up
Baker retinum ii. patlrer and ran in hole 102,215.
04:00
05:30
1.50
5.50
W O.
M
12
P
Set packer and test 9 5l8-casog from 2215' W surface n 1500 pal for 15 minutes charted (Good Test). Puck up one stand
and me in hole to 2308' and test seeing from 2208' to surface (best Fan). Annulus B (pressure stating .1 170 psi) sorted to
pressure up and tolkrw Pressures of 9 518' wsirrg indicating dkect communication.
05.30
07:00
1.50
7.00
67.0.
M
4
P
Pull out Of hole with packer and* down 2 items and th packer.
0700
13:30
6.50
13.50
W.O.
J
5
Tr
fgup SLB E -i WHIWc and PDS WOB.Funmiw host fools.
1330
22:30
9.00
22.50
W.O.
J
11
P
Run In hole with wiper IN from surhne W 11.703' with welitec tractor. SLB..Lino and PDS caliper W. Fill hole with 9.6ppg
brine oke 33 phis. Trader engaged at 2ID , Tractor was seeing debris at 11703' and stopped t0 prevent debris from
in orke ding with Palmer. Siad caliper lag from 11,]03' at 50' W minute to surface. no caliper recardegs indicate damage on
in.. of the caliper fingers at -2,275 WLM near where a hole was recemed in the Wring that was pusad. The do.,.
appears W be approximatey 1.8Inches long and measures approximately 17% of wall thickness shop.
SIMOPS Watling pipe shed with 4.5' 521 tubing to drift strap and oily
22:30
00:00
1.50
2470
W.
J
5
P
Sentl dale i1 be evmuatetl al PGS h Houston. Prepaze and begin W dgpetl down togs.
33 bbh m B.6 ppg bene tamped down hole the last 24 hours.
Gas Readings
Avg Background Gas (%1 Max Background Gas I%)
Avg Connection Gas (%)
Mar Connection Gas (%)
Avg Drill Gas (%) I Max Drill Gas I%)
Avg Trip Gas I%)
Ma. Trip has (%)
Daily Mud Volumes
TanMAdditkouLass
Type
Do.
Volume Ri
Tank
-HI,.-Pits
5]4.0
Hole
Hole
1,104.2
Lacs
Formation
31.8
Cumulative Mud Volumes
Active Volume(bbe HOW Volume(bbp Additions that Gum Additions Losses(bbp Cum Losses (WO
1,670.2 1,104.2 0.0 0.0 1]1.8 9939
Daily Contacts
Position
Contact Name
I Company
Tisa
Email
OMise
Mobile
Eni represenotiva
BmcaSimonson
EM
Orill'mg Sup¢
sMd` rg�enipatroleum.Pm
90]-885-0]15
Enl repmsenoWe
Mike Grvbb
Eni
Drilling Supv.
siddnlling@enipetrust arcem
90]E05-0)15
Well Name: SP05-FN7 OR
Wellbore Name: SP05-FN7
Well Code: 26944
Job: WORKOVER
WCER Level:
Daily Report
Date: 11/6/2018
Report A: 8
Page: 2 of 2
Daily Contacts
Position
Contact Name
Company
TitleEmail
Office
Mobile
Enirepresentmoe
Much BIllington
End
Sly Clark
AKRigClerks0cwn l 5@enipelmleum.
907-605-0722
mm
EN repreaentatwe
Mark Hubler
EM
HSE
Ent heresentafive
Steve Kalb
Fal
HSE
Tool Push
Sam Dye
Doyon Dnllung
Field Superintendent
Tool Push
JueS. Hays
Do,. Dulling
Tad Pusher
ns SQdoyromm111ng.com
Tool Push
Ryan Panklak
Doyon Gelling
Tour Pusher
rg15®dpyopUd11ihBcom
Tool Push
Ctiff Owens
Doyon Dniling
HSE
cmens@dMnddlling.com
685-0796
Tool Push
Smttslmmons
Doyon Drilling
USE
Personnel Log (POB)
Company
Sam. Type
Work H (hr)
Sued* H (hr)
Count
Note
GBR
Casing Service
12.50
0
Dulling
ASRC
Clan:
12.50
1
Drain,
ASRC
SOA
12.50
1
SID Suppon
ASRC
Creme Adasor
12.0
1
SID Support
Beacon
Medic
12.0
1
SID Support
Doyon
Field Superintendent
12.50
1
Driving
Northam o4hold Sera«s
Fuekr
12.50
1
SID Support
Vet. Gray
Wellhead
12.0
1
Dniling
Ml Swaco
Mud Engineer
12.0
1
Citing
PDS
Cuiperlogging
12.50
t
Dribing
ACS
Enviromental
12.50
2
SID Support
ASRC
Company Man
12.50
2
Drilling
Baker Hughes
Baker Hughes CenNIR
12.0
2
Dolling
Beacon
HSE
12.50
2
SID Support
Doyon
Toolpushers
12.50
2
DnXing
Doyon
HSE
12.50
2
Drilling
MI Stew
Mud Phat
12.0
2
Dulling
Halllbumon
Men loggers
12,0
2
Ddlinq
Well -Tec
Tractor Service
12.50
2
Drilling
SLB
E -line
12.50
3
Drilling
ASRC
Lagkkc
12.0
4
SID Support
Ml Swam
WIF12.50
4
SID Support
Purcell
Security
12se
5
SID Support
Jamba
Truck driver/Cane operator
12.50
10Dn""
ESS
Gaining
12.0
10
-up'
SID Suppon
Doyon
Rip Personnel
12.0
22
at Total Dolling Personnel 5]
BOP Stack 8 Components
Description
Start Dab
Last Codification Data Pressure Raring (pat)
Type Make Model
ID Nom(in)
PSange (pail "at Cert Bate
Slow Circulation Rates
Pump Number: Make:
Modek
Siert Data End Date
Later Suez (in)
Volume Per Stroke Cr artme (bbllsih) Max Pressure (psi)
Data Depth(M(B)
Slow Sptl I
strokes ham)
Iper)
I OF(%) OFl. fi z l
Daily Bulk
Supply lcem Deacdptlon: Equlpmenl Fuel
Unit /steel:
Gal
Unit Size: 1
Note:
Bete Consumed R«Nvttl
Returnetl
tum Consumed
Cum Received
Cum ReNrnetl Cum On Loc Nde
nmuzate lzozg tzozo
esaeo
e,fiaao
0.9
0.0
Suppry lstimulate Npaan: Med pla"olbra
UNt Label:
Gal
Unit size:
NOW
Date Consumed Received
Returned CumConsumetl
Cum Reoai sd1
Cum Returned Cum Cn Loc Nth
11/!/218 42.0 42.0
294.0
z94.o
0.0
0.0
Supplylteiootpam: Rig Fuel
m D
or.,..: gal us
Unit Size: i
Note:
Data Conaumed R«eivetl
ReNrnetl Cum Consumetl
Cum Storeyed
Cum
Returned Cum On Loc Note
11/6218 1,mu 7]64.0
12,543.0
26,330.0
0.0
13,]8]0
Suppry Rem DexNpaon: Pop Water
Udt Label:
bbl
Und size:1
Note:
Date Consumetl RecNvca
Represent
Cu. Consumed
Cum Received
Co. Returned Cum on L« Nate
IIWD1B 3fi0 36.0
338.0
588.0
00
230A
Supp/ Icem DeecNptlon: WIF Rollers
UnNLahto
Gal
Unit Size:
Nde:
ince Consumetl R«event
Returned
Consumed
Lum notation!
Cum Returned Cum On Loc Nde
11/82010 1980 1980
IC
1,388.0
1,3860
0.0
0.0
Suppry Item Oescripaon: WIFinjaded Diesel
UNI Label:
Gal
Unit size:
Note:
Data Consumed RsceWed
Returned Cum Consumed
Cum Remivetl
Cum
Returned Cum On L« Note
11Ifi2018 420.0 420.0
2,814.0
2.014.0
0.0
0.0
LaSt AUthOrlty Visit
Data Tot net. She Total I.N.L. number Cato at
1IM2010
BOP Test AOGCC Jeff Jones waived wilnesa
to BOP lest, next kat rine 11/102/8
S P Cards Submitted
Company
aRpra
Co.
Doyon Onili^B
14
PJ M's
Deren Drilling Inc,
19
Ears Cama
Doyle Drilung Inc,
14
COW
Doyon Drilling Inc.
14
HRWS
Ml Swaco
4
IIARCIJSA
MI Swam
4
RIR's
General Notes
Comment:
Well Name:S-FN7 OR
Wellbore Name: e: SPOS-FNEN7
Well Code: 26944
ani WCERLevel
eve OVER
Daily Report
Date: 11/'7/2018
Report #: 9
Page: 1 of 2
Header
mieConcession N° Operator
Subsidi11;4a5
SKA ENI PETROLEUM
Initial "has Cotle
ENI PetDEVELOPMENT
ry Table Elevation(ft) Water DepM lfti
WELL
Fla Flange
2 p W
ge(m) RKB Tubing Spool lfti
16.9]
s
31]4
Name Contractor
15 DOYON
Rig TYpRIg Start Date Rig Release Date
Informationther
LANDRI1225201]ily
Temperature PF)
tly Cloudy
Word
Data RI(do,) Pooety
rrel
25.7
Incitlents• Hear Miss
SW 14 MPHda,)
345.00 76.0
Category Type
Subtype severftOause Lost time?mentety
DrillsType
ority Visit
MOccur
Last Date
Nest Date
Days Unml Next Check
(do,.)
Drill
1
11WO18
11/1012018
3
ftk2
Drill
11n12018
1121/2018Dr.
14
Down Drill
IN1
3
11/512018
1111&2016
g
Rig Inspection
1
11=018
ini=19
85
Satisfy Meetllg
9 11172018
I IIW2018
1
Spill Did
9 11172010
111/820181
TT Kbk While tldllirg
1 11/312018
11142018
,3
TT Kick While Td
Tripping
1 11/8/2010
1192010
0
TT Man Down End
1 1832018
limno10
a
TT Rip Evawatoon RAI
1
nrcr2ole
nn2ole
3
TT Well NUII Dna
1 1
013121110
12912019
03
Casings seat
1 1117/2018
2x512018
90
Cos. Type
R
OD (in)
ID ... 0
Grade
To,(ftKB)
AM.jftK8)
TVD Bot. IftKB)
Run Data
CASING 13 318
160.0 160.0 1112011
12.42 L-80
CASING 8518
-0.1 3.909.0 2.452.5 12192012
8.84 L -BO
LINER 512
0.1 11,9880 3,8950 121302012
4.95 L-80
LINER 3112
f1,]]LO 20,6750 3,9010 111]12013
Last Cementing
'0S 6a 20,6]3.0 3,9014 502014
Cementing Start Oats: 5172014 aging: UNER, 20,673.OM(B
Comment: 3.5' X 5S^ liner hanger/ packer net inside 5.5" liner. TO liner 20,616'. biro at at shoe � 20,6]3'.
8[p b Top IftKBi Top Meas Mealami
(BKB)
1 20,818.0
Cam
2 , 73.0 SLB Test lines l0 3500 psi. SLB pump 25 bels f0.5k MutlPuaM1, 25 ebb 158M cement, Map 5' wiper bell, 15 bels
10.M MWP sh and rig displace w1184 bble.Iick water. Sting into liner packer anti squeeze cement W 43 bible of slick
Job Information
water. CUP @ 1010 bre.
Job Phan Penned Start Dale
WORKOVER 10/30201018:00
Start Date Entl Oale PSO Duration Joe,)
t0I30201818'00 0.00
Daily Summary Operations
T4M1 Forecast
Rig up wire line anti run a Gemma ray, CCL anti calirr. RIg tlown care Nne after tlata Is c.nfmletl su8able bice rrtebelon
BW. Shut rams and install McMlafing head.
w0M1 casing tech. Farm hole 5' TT525 as kill string W2500 and Land tubing hanger Win
24M1 Summary
Rig down and lay oro e -Ione Tool. Nom caliper run, Load tubing in pipe Mad and strep anti dd0 Cut and sop drilling line. Run scmpar end la
for wire line dg up, pared mill enough liner pe1cM1 area. Ley down mill assemble and prepare
opera".. at 87.00
Rig ups -We.
Time og
Start Erol Co. Dur
Tome TNne Our bn (Io) Phase Opr. Act.
Plan
Saw 01:00 100 1.00 W.O. J 5
0.r. Descr.
P Finbb uggim down Hine.
01:00 12:00 11.00 1300 w . M 2D
P Loading pope into pipe aM1ed, sirup and tlnR Replecaw...lore on C,can
damunme. and Missiles mud trough N pHs for Inside.
Chian rig floor end 0rgad.. cabonets. Oben and Inspect cannot, camera. Inspect drill Pipe for scale, mire round
12:00 14:00 2.00 14.00 W.O. M 25
P Cash slop drilling line G.M., w_ sub, d.w won¢ brake. and Ing...
14:01) 18:30 4.50 18 5() W.O. M W
P Continue W land, strap and dnfl mum in pipe a ed Confinue b moollor Inventory
well Dump parts anti flits.. Gear Ice from
stain end walkways. Add 24 bbN t. fill well up m.U&.
18:30 21:00 250 21.00 W.O. M 5
P Mese m 8 SIB (9 518" rsing drift) tarred mill and scraper aese nts aid o. o bole to 240]'. No excess tlreg m
mnning
hot.. Nil at of nob F/2401" T2310' and stand back one island Rofata slowN M 5RPM, TD4ak, With 3 bpm 50
bt psi,
RTw90k. (Su.peded bole in casing @ 2,275' wire line depth) SboRbg ham MIS, to 2221' wiping enough 2 times. Stopped
Pipe movement & Pump and rotation and W prevent fluid from going down flow line due to diesel and oil cap, waited 15
minutes. Run scraper assembly back through F/ 2,221' T2,310' at 4-5 bpm and beck F2.310' T2 221'. No over pall
21:00 0000 00 24 00 W.O. M 4
06selveil. aluw down tap drive.
P Pull out of hole F2,221 t. sutler. Mom beide drill pipe and laying down craper aid tapered mill assembly. Clean and
clai n fluor. Prepare farwore fine rig up Fill hole well calculated pipe replacement warm m relvma.
89 bels of 9.8 pD9 bone pumped down hale Me lest 24 hours
Gas Readings
Avg Background Gas (%) Max Background Gas (%)Avg i:: Gas (%) Max Commodes Use (%)
Avg Drill Gas (%) Max Drift Gas (%)
Avg Tdp Gas (hl Max Trip gas (%)
Daily Mud Volumes
TanMAddftion/Loss
TYPe
Des
Volume (6611
Hale
Aotive Pita
5080
Hole
Loss
i 1042
Formation
Cumulative Mud Volumes
69.0
Ac"ve Volume Ind) Hole Volume 1661) Additions IbM7 Cum Addili.ns Ibbll Losses (661)Cum Losses (bbl)
1,6@9.2 1,104.2
0.0
0.0 1690 1.062.9
Well Name: SP05-FN7 OR
Wellbore Name: SP05-FN7
Well Code: 26944
Job: WORKOVER
WCER Level:
Daily Report
Date: 11!7/2018
Report #: 9
Page: 2 of 2
Daily Contacts
position
Contact Name
Company
Tire
Email
Office Mobile
Ertl representative
David Smith
Eni
Calling Supv.
EN representatNe
Mike Grubb
Eni
Drilling Supv.
siddelingtienipeeMeum.com
907fi sl)715
Em reprasentatrve
Macb dilinglon
Eni
Rig Clerk
AKR1gCle1dDoyon1 5®enipetroleum,
90]-685-0]22
Eni repmsenletrve
Me&Nobler
Eni
HSE
com
Eni repmserdative
Slave KMb
Eni
HSE
Tool Push
Sam Dye
Doyon
Dtlling
Field Superintendent
Tool Push
Chad Johnsan
Doyon
Calling
Tool Pusher
ngl5Qtloyondn8ingcam
907-6850716
Tool Push
Ryan PankmM
Doyon
DHling
Tour Pusher
riglS@doyondnmrg.com
That Push
CliXGvrens
Open
Drilling
HSE
cowens@doyondnPing.com
68s07W
Tool Push
Dave Sena
Doyen
Drilling
HSE
dsena®doWntlnl0ng.com
685-0796
Personnel Log fP
8)
Company
S.rv. Type
Work H ad)
Stand-by H (hr)
Count
Note
GSR
Casing Service
1250
0
Dnlling
Well -Tec
Tractor Service
1250
0
Calling
PCs
Caliper logging
12.50
0
Dulling
SLB
E -line
12.50
0
Calling
ASRC
Cie*
12.50
1
Dri irg
ASRC
SOA
12.50
1
SIDS.,ort
ARRC
Gane Adwsor
12.50
1
slosupporl
Beacon
Medic
12.50
1
SID Support
Dayan
Field Superintendent
12.50
1
Drilling
Northern Oill Services
Foekz
12.50
1
SID Support
Vagi, Gary
Wellhead
12.50
1
Dn9irg
Ml Sworn
Mud Engineer
1250
1
Detling
ACS
Envpomentil
1250
2
SID Support
ASRC
Comparry Man
1250
2
Drilling
Baker Hughes
Baker Hughes Cenbilat
12.50
2
Calling
Beacon
HSE
12.50
2
SID Support
Doyon
Toolmakers
12.50
2
Drain,
Cayce
MSE
12.50
2
Dr Uing
MI Sen.
Mud Plant
12.50
2
Dnll'mg
Halliburton
Mud loggers,
1250
2
Drilling
ASRC
Logistic
12.50
4
SID Support
Ml Sween
WIF
12.50
4
SID Supped
Pushing
Security
"o5
SID Support
Jacobs
Truck dryer I Crena operator
12.50
10
Drilling
ESS
Catering
12.50
10
SID Suppart
Coyne
Rig Personnel
1250
21
Dnlling Total Calling Personnel 47
BOP Stack 8 Components
Description
Start Date
Last Certlficliion Data P.m. Rating 1psil
Type Wke Model
ID N. (in) I
PRange (psi) Last Cert Oat.
Slow Circulation Rates
Pump Number: Maks,:
Model:
StartDate Entl Date
Liner Size (in)
Volume Per Stroke Override lbbNSY4) Max Pressure !Psi)
Date Dep1M1 (Itl(B)
Slaw Spd
Strokes s 1
P(psi)
EXI%) 0Flow (gpm)
DailyBulk
Supply Item Description: Equipment Fuel
Unit Label:
Gal
Unit Size: I
Note:
Data Consumed Recelvetl
Returned
Cum Consumed
Cum Received
Lum Returmtl cum On Loc Note
11,]12018 1,1590 1,159.0
8.8W.0
9,80].0
0.0
0.0
Supply Hem Deaeripbn: Mud Plant Boilers
Unit label:
Get
Unit Size:
Note:
Daea Consumed Re Ned
Returned
Cum Consumetl
Cum Received
Cum Returned Co. On Loc Note
111201s 42.0 420
338.0
336.0
0.0
0.0
Supply Item Description: Rig Fuel
Untt LebM:
gel us
Unit Site: 1
Note:
Oats Consumetl Recalved
ReWmetl
Lum Consumed
Cum Recopied
Cum Returned Cum On Loc Note
111@pts 1,}19.0 DO
13,8620
26,330.0
0.0
12,4680
Supply team Description: Rig Water
Una Label:
bM
Unit Size: 1
Note:
Date Oonsametl Received
Returnetl
Cum Consumed
Lum Recelvetl
Cum Returnetl Cum On Loc Note
11112018 520 135.0
390.0
'/03.0
0.0
313.0
Supply Hmn Desoriptlpn: WR BOYere
Unit Label:
Ger
Unit Size:
Note:
Date Consum.tl Neceivetl
Returned
Cu. Consumed
Cu. Recelvetl
Cum Returned Cum On Loc Note
,"..18 t9s0 198.0
1,5s4.0
1.584.0
OD
0.0
Supply flim Deacdptlon: MF meacted DHssl
Unit Label:
Gan
unit Size:
Note:
Data Consumed ReceNotl
Returned Cum Consumed
Cum Recelvetl
Cu. Returned Cum On Loc Note
11!2018 0.0 0.0
I I 2,8140
I 2.8140
I 0.0
I 0.0
last Authority Visit
Data Tot leap. Nbr
Total LN.C. number comment
11132018
BOP Test, AOGCC Jeff Janes waived witness
to BOP test, next test
due 11/1012018
STOP Cards Submitted
Company
# Rpla
Co.
Dayan Dnlling
9
PJSM'S
Cayce Dnlling Inc.
18
Sale Cams
Dayan Calling Inc.
9
COW
Doyan Drilling Inc.
9
HRWS
Ml Syge.
4
HiRGJSA
MI Sworn
2
RIR'.
General Notes
Cashmere:
Well Name:S-FN7 OR
Wellbore Name: e: SPOS-FNFN7
Well Code: 26944
Job: WORKOVER
en i WCER Level:
Daily Report
Date: 11/8/2018
Reportp: 10
Page: 1 of 2
Well Header
Pennitooncession N°
Operator Subs tliary InNal Lahee Code
ALASKA
ENI PETROLEUM ENIPetrd mCa. Inc. DEVELOPMENT WELL
Rotary Table Elevation (111rDepth too "PenFlange in) RKB - Base Flange on RKB- Tubing cartoon
5362 0.00 16.97 36.65 31.74
Rigs
Rig Name Conhacfor Rig ITRig Num Rig Start Deb Rig Release Date
RIG 15 OOYON LAND RIG 0]23 1225201]
Daily Information
Weather Temperature(°FI Wintl Oays LTI(days) Days RI /days) POB
Overcast 226 WNW @6MPH 346.00 34600 790
Safety Incidents - Near Miss
Dab cutegdry Type Subtype Severity cause Lost lime]
Comment
Safety Drills
Days Unlit Next check
Type
aCocur
Last Data
Next Data
(days)
Authority Visit
1
11W2018
llflV2018
2
Fire Doll
3
11/82018
11=2018
14
Kick While Tripping Doll
3
11/52018
11112/2010
4
Man Down Drill
1
1102018
11312019
84
Rig Inspection
10
111812018
IIMI 018
1
Safety Meeting
10
11182018
11/9/2018
1
Spot Doll
1
11132018
11/412018
A
TT 12S Drill
1
11162018
201 19
90
TT Kock While collrg
1
11/62018
1102010
-1
TT Kick While Topping
1
11/3/2018
111412018
4
TT Man Down Doll
211/82018
21612019
90
TT Rig Evacuation Gil
2
all
2/62019
90
IT Well all Doll
1
lin/2010
2/5/2019
89
Casings seat
Cas. Type
OO On)
IDlinl
Gfatle
Top HtKB)
Bottom(ftKBI
TVD But.(ftKB)
Run Data
CONDUCTOR
160.0
160.0
tT17761 -1
CASING
1338
12.421-80
-0.1
3,909.0
2.452.51211&2012
CASING
95/8
8.84
LA0
0.1
11,959.0
3,9950
1213W2012
LINER
512
4.95
LA0
11,771
0 20.6750
3,9010
11171M13
LINER
312
20,61661
20.673.0
3,9014
513/2014
Last Cementing
Cementing Start Date: fifiri SMn9: LINER, So eggi6fIKB Comment 35"x55" liner hanged packer set inside 5,5 liner. TO liner@ 20,618, him official shoe@ 20673'.
Sit, g p Top Top Meas Meth
Bhn lftice)
Co.
1 loos .0
20.6130
SLB Test lines to 3500 psi. SLB pump 25 bbls 10.50 MudPuzh, 25 bids 15 N cement, drop 5 wiper ball, 15 h6k
ID.50 MudPush and og displace al 184 lbs slick water. Sling Into liner packer and squeeze cement wl 43 blue of slick
1
water. CIP @ 1010 hts.
Job Information
Job Phase Plannretl SWrt Oate StartDate End Data P50 Barrel (days)
WORKOVER 10I30201a18:00 10130201818:00 0.00
Daily Summary Operations
24h Forecast
Waiting on SLB materials and personnel, ng mainbnaee 8 houselmephg. Prepare He for upcoming rasing pal human well pressures. Rectum Wool on loutlon.
24h Summary
Rig up wire line and ton a Gamma ray. CCL and calms. Rig down wire line after data is con6mled suitable for consisted with casing patch Run in hate with 5' W525 as kill slmy W 2667 and Land tubing hanger
wife BPM. Shut ems and install circulating head.
operation at 0.00
Waging on SLB materiels and personnel, SIMOPS load, step antl My 45" $21 Hptl on pipe ahetl
Time Log
Stall
End
Co. our
Time
Time
margin
(In
Phase
Op, I
Act,
Plan
Oper. Deer.
0:
700
7.00
W .
M 25
P
Lead tubing into pipe What to strap and drift. prepare bar Install of Wit string. Complete MPI work adders far rig ficon
Inspect and add htdrea oil to tap drive. Start inspect mud pumps 1, 2 and p3 fluid ends. Adjust protective evening on top
drive servtu In,
000
1600
9.00
16,00
W .
J 11
P
Rig up SLB Eine. Pick up gamma ray and COL tank, ton 0 We to 2,980' and reg up. Acquire acoepbbk data for
conalation of Sahel rasing p h. Rig down SLB el Wars and equipment.
1600
0000
800
24.00
W.O.
23
P
Welling on SLB tools and equipment Wr using "" SIMOPS make up mule shoe and X-0 sub to bottom of F TT525 Run
In nos with 27 stands of dill] pipe and xro antl pup on border of hanger wife leading Pim T12,587.4. Pumped 32 bible of 9.6
peg brine dawn hole, fluid Weal b stack, shut oft pump, add level Nearly dripping. Land out tubing hanger who new OnWg
and REV installed and ton in lock downs. Test 00 seals to 50M psi (goad teal, Shut lower pipe tams an landing joint and M
up pump in sub on Wp of landing Pint and shut in valve. Load 10 Pints of 4.S Hyd 521 P pipe shed W strank dot ark Wlty.
Continue to clan and organWe dg. Inventory BOP components. 34 bbls pumped into well of 9.6 mpg brine In the Net 24
hours.
Gas Readings
Avg Background Gas (%)
Max Background Gas I%)
Avg Connection Gas (%)
Mea Connection Gas Pb)
Avg 0r11I Gas 1%)
Max Drill Gas 1%)
Avg Trip Gas (%)
Max Trip Gas (%)
Daily Mud Volumes
TanWAdd'dfomL Type
Des Volume(bb0
Tank Asliee Ins.
536.0
Hole Hole
1.1043
Loss Equal
320
Cumulative Mud Volumes
Active Volume (hot) Held Volume (bbl) Amidons (bbl) Cum Addkto s (bbp Losses (bbl) Cum Lasses (blip
1642.2 1,104.2 00 00 32.0 1.094.9
Daily Contacts
Position
Contact Name
Company
Title
Email
Ofrpe
se'do
Enl Wrasentaliva
David Smith
EN
Drilling Supv.
Eni represantNive
Mlke Gmbh
Ed
Drilling Supv.
siddrilting@enW"a um.com
90]A85-0]15
Well Name: SP05-FN7 OR
Wellbore Name: SP05-FN7
Well Code: 26944
Job: WORKOVER
WCER Level:
Daily Report
Date: 1118/2018
Report #: 10
Page: 2 of 2
Daily Contacts
Poe tbn
Contact Name
Company
Title
Email
ORlce
Mobiw
Enlrepresentative
Mitch Billington
End
Rig Clerk
AKRigCierkaWyonl5Q �enipetmleum.
907-685-0722
cern
EN representalN.
Mark Holder
Eni
HSE
Em rap .... dollar
Pat AN.
End
HSE
Tool Push
Sem Dye
Doyon Will,
Field Superintendent
Tod Push
Chari Johnson
Doyon Drilling
Tool Pusher
ng15 do tln15n
yon g.com
907-605-0716
Tool Push
Ryan Pankratz
Doyen Dulling
Tour Pusher
rIg15®doyorMn1lirrg.com
Tool Push
Cliff Owens
Wynn Doling
HSE
cooemlififir,oraftl1h,corm
685-0786
Tool Push
Dave Sena
Dart. Dnlldng
HSE
dinneittloyontlrdlling.com
NM796
Personnel Log (P( B)
Company
Sam. Type
Work H (h0
Standby H (ti)
Count
Note
ASPC`eYk
12.50
1
Idng
ASRC
SOA
12.50
1
SID Support
ASRC
Crane Admor
1250
1
SID Support
Baker Hughes
Baker Hughes CenlnliR
12.50
1
Dulling
Be...
Medic
12.51)
1
SIDSUpmd
Doyon
Field Supeuntenrlent
12.50
1
Drilling
Witham OWaild Sa eops,
Fueler
12.50
1
SID Support
Velm Gray
Wellhead
12.50
1
Owing
MI Swam
Mud Engineer
12.50
1
Dulling
ACS
Emmen Mal
12.50
2
SIDSuppw1
ASRC
Company Man
12.50
2
Drilling
Beam.
HSE
12.50
2
SID Support
Con.
Toolpushers
12.50
2
Drilling
Coyon
HSE
12.50
2
DuddrM
MI Sween
Mud Plant
1250
2
Driiting
HaIIlbuMn
Mud loggers
12.50
2
Dolling
ASRC
Logistic
12.50
4
SID Support
Ml Sham
WIF
12.50
4
SID Support
Final
Security
12.50
5
SID S ... on
Jambs
Truck driver l Crane operewr
12.50
10
Drilling
ESS
Catering
12.50
10
BID Support
Doyon
Rig Psm.nnel
1250
1
23
Dnlldng_Tmal Dulling Personnel 48
BOP Stack & Components
Description
Start ew
I
Last Comfication Date Pressure Raring (psi)
Type Make Model
IC Now (in)
PRan,.(,I) Last Cert Date
Slow Circulation Rates
Pump NumheC Make:
Madel:
Sununu, End Date
Liner Size (in)
Volume Per Stroke Override(bdletk) Max pro ssera(Psi)
Wm D Pap ntKBl
I Slow Spd
Strokes (show
P(,I)
Ed I%) OFlow(gpm)
Daily Bulk
Supply Item description: Eaudpment Fuel
Unit Label:
Gal
Unit Sion: 1
Now:
Ww Consumed Received
Returned
Cu. Consumed
Cum Received
Cum Returned Cum On Loc Now
1ll02018 1,290.0 1,290.0
1]09]0
11,0970
00
0.0
Supply now Conscription: Mud Ram Screws
Undt Lerch
Gal
.."Sure:
Note:
Copan Received
M
Returned
Cum Consumetl
Cum Receivetl
Lum Repornetl Cum On Loc Now
42.0 42.0
NSA
3]8.0
00
0.0
Supply Iwm Descdpdon: mg Fuel
Unit label:
gal us
Unit Size: 1
Note:
Ww Consumetl Received
Returned
Cum Consumetl
Cum Received
Cum Returned Cum On Loc Note
11/82018 1,28].0 10,1000
15,129.0
366300
0.0
21.301.0
Supply Item Description: mg Water
Unl[Label:
is
Unit Size:1
Now:
Oau ConsumetlReceNed
deposited
Cum Consumed
Cum Received
C1m Returned Cum On La Nota
11102018 30.0 0.0
420.0
703L
0.0
283.0
Supplyltam Oew www: WIF Bokser
Unit Label:
as
Unit Size:
Note:
Wte Consumetl Received
11182018 198.0 198.0
Returnetl
Cum Consumed
1,782.0
Cum Recelvetl
1,7820
Cum
00
Returnetl Cum On Loc Now
0.0
Supply lwm description: WlF l,jadad Dwael
Umt Label:
Gal
Unit Size:
Note:
Cum, Consumed Recelvetl
11/52018 4200 4200
Returnetl Cum Consumetl
3,2M.0
Cum Recamed
3,234.0
Cum Returned Lum On Loc Note
O.o 0.0
Last Autbonty Visit
insp. Nbr
DareTotal
I.N.C.number Comment
1U312018 For
SOP Test, AOGCC Jett Jones wmoad witness
to BOP test, neM wsl
tlue 111102018
STOP Cards Submitted
Co."#
laws
Com
yen Dnllln9
1
PJ
Doyon Wilting Inc.
14
Safe Cells
Doyon Willing Inc.
10
MW
Doyon Wiling Inc.
10
HRWS
Ml S.C.
4
HARCIJSA
MI Swaco
4
RIR's
General Notes
Comment:
Well Name:SPN7 OR
Wellbore Name: e: SPOS-FNFN7
Well Code: 26944
�n '
Job: WORKOVER
eni WCER Level:
Daily Report
Date: 11/9/2018
Report #: 11
Page: 1 of 2
Well Header
PaI.WC.... aalon N°
Operator SuhslElery Initial Lance Code
ALASKA
ENI PETROLEUM ENIPM h. Co. Inc. DEVELOPMENT WELL
—law Table Ebverem 1.1 Water Depth (ft) as Flange(k) RKB-Base lange(tt) RKB- Tubing Spool (8)
53.82 0.00
ifi.9] 3665 J19q
Rigs
Rig Nam.
Lonhacmr Rig Typo Rig Num Rig Smrt Wm Rig Release nate
RIG 15
OOYON LAND RIG 03 1225201]
]2
Daily Information
Weather
Temperature l°FI Wind Oats LTl (drink) Days In fidaYsi PCB
Clear
11.6 E 4MPH St .0 34].00 7l0
Safety Incidents- ear Miss
Doh categoryType
Subrype Soviet, Cause Lost tons?
Comment
Safety Drills
Days Until Next Check
Type
#Occur
last Date
Next Date
(days)
AUMoriy Visit
1
11132018
11/102018
1
Fire Doll
3
111812018
1122/2018
13
Kirk While Tripping Doll
3
1115/2010
lllIV2018
3
Man Dawn Drill
1
1122018
1/3112019
83
Rig I®peclion
11
11/92018
11/102018
1
Sakti Meeting
11
111912018
11/102018
1
Spill Drill
2
1152018
11/1012018
1
TT H2S Drill
2
1152018
2n2019
90
TT Kick While dolling
1
1182018
1102018
-2
TT Kick While Topping
1
111312018
11/42018
-5
TT Man Down Ddl
2
I lIV2018
2812019
Bs
TT Rig Evacuation Will
2
11812018
M12019
69
TT Wali Kill 0611
1
1102018
2/52019
88
Casings Seat
Cas. Typo
I Col.)
ID hot
I Grade
I Top(ftum)
I ii I--
I TVD BOL I ... I
Run OaN
CONOLICTOR
'no .0
1800
111/2011
CASING
133E
1242
L60
-0d
3.909.0
2,452.5
IVIM012
CASING
9 S
8.84
L-80
0.1
11,989.0
3.9950
1213012012
LINER
5 f2
4.95
L-80
11,]]1.0
20,8]50
3.801.0
1/1]12013
LINER
312
20,618.6
20.5]3.0
3,901.6
Sl3/2Gi4
Last Cementing
Cementing Start Date: 502014 Shing: LINER.20,8]30111(8 Comment 3.5%5.5" finer hanged packer set inside 5,F lines TO liner @20,6t&, blm of tshoe 20,5]3'.
Top IkK6I
Top Mea. Meth
Bbn (ttKB) Com
20.fi18 D
20fi]30 SLB est linea to 3500 Po. SLB pump 25 bbls 1D.5# MudPosh, 25 bble 15.0# camenL drop Y wiper ball15Ims
push and og displace w1164 bids stick water. Sling into finer packer anti squeeze cement wl 43 bbla or slick
@ 1010 his
Pormat/oneStart
DaleEnd Dam P50 DmAaon (drys)
F24hForecast
ER 10/30201818:00 10130201818:00 0.00
ummary Operations
with welt operaYwna smpended waiting on SLB casng patch moderate and personnelary
Continue with well operations suspended, wailing an SLB casing Patch materials and personnel, SPACES ng maintenance.
Operation at 07.00
Continue with well operations suspended wafting on SLB casing patch materials and personnel, SIMOPS rig maintenance.
Time Log
Stan
EM
tum Dur
Time
I Time
Dur (M1G (m)
PM1ase
Opr.
Act
Plan
Over. Descr.
00 00
0M
'o fm 2400
W O.
M
23
P
Canova wait" on SLB materfals and personnel for casing patch. SHADES rig performing maintenance m Planetary gears
I
n dg moving syslem. Fabing finer wash cooing system for mud pumps 1 and 2. perform general house keeping. Extend drip
pan drain Ilnea. Prop and paint arms of need.
Gas Readings
Avg Background Gas (%)
We Background Gas (%)
Avg Connection Gas (%) Max Connection Gas (%)
Avg Doll Gas (%)
Max Doll Gas 1%)
Avg Trip Gas (%) Max Trip Gas (%)
Daily Mud Volumes
r..WMditi L..s
Type
Des
Volum. (MillTank
Active Pits
5380
Hole
Hae
1,1042
Loss
Fpmralion
Cumulative Mud Volumes
Active Volume (bbl) Hole Volume (bbl) Additnm (bbl) Gum Mtlitians rybo Lasses (poll Cum Losses(bMl
1,642.2 1,1042
0.0 0.0 0.0 1,094.9
Daily Contacts
Position
Contact Name
Commny
Title
Email
OMce
Mobile
Eni representative
David Smiih
En
74-ing Supe.
Eni Rpmmntathm
Mike Gmbh
EN
piling Supv
siddrillingl®enicetrokum coca
90]$85-0]15
Eni representative
Mitch Billington
Em
Rig Clark
AKRigClerks0oyonl Sidienipeholeum,
907685-0722
one representative
Mark Hubler
Em
HSE
Eni represmblNe
Pal Ahem
E.
HSE
Tool Push
Sam Da
Doyon Ddftng
Field Superintendent
Tool Push
Chad Johnson
Doyon Drilling
Tool Pusher
dgl5@doycndnlling.com
907685-0716
Tool Push
Ryan Pankratz
Doyon Dnlftng
Tour Pusher
ng15@doyondn11ing.com
Toll Push
CliffOwens
Doyon Dnim,
HSEens®da
yp nddllln
605-0790
Tad Push
DavisSena
Doyon Wiling
HSE
damaitdoyon0olling.omon.cem
6050798
Well Name: SP05-FN7 OR
Wellbore Name: SP05-FN7
Well Code: 26944
Job: WORKOVER
WCER Level:
Daily Report
Date: 11/9/2018
Report #: 11
Page: 2 of 2
Personnel Log (POB)
Company
Be,. Type
Wolk H (hr)
Stand-by H pr)
Count
Note
Vel. Gray
Wellhead
12.50
0
Drilling
ASRC
Clark
12.50
1
During
ASRC
BOA
12.50
1
SID Support
ASRC
Crane Advisor
12.50
1
SIDSUPW
Baker Hughes
Baker Hughes Centilih
12.50
1
Drilling
Enamor
Medic
12.50
1
SIO Support
Doyon
FIeM Superintendent
12.50
1
Drilling
Northam Oiffeild Services
Fueler
12.50
1
SID Support
MI award
Mud Engineer
12.50
1
Dd0ing
ACS
Environmental
12.50
2
SID Support
ASRC
Company Man
12.50
2
Drilling
Bean
HSE
12.50
2
SID Support
Dayan
Tool pushers
12.50
2
Dulling
Dayan
WE
1250
2
Drilling
Ml Sworn
Mud Plant
12.50
2
Dulling
Halliburton
Mud entities
12.50
2
Or N,
ASRC
Logistic
12.50
4
SID Support
MI Swas,
WIF
12.50
4
SIDSUpport
Pundit
Security
1250
5
SID Support
Jacobs
Tmck drver/Crane operator
1250
10
pilling
ESS
Catering
12.50
10
SID Support
Caton
Rig Personnel
12.50
22
Nfling_Tolal DdOing Personnel 48
BOP Stack 8 Components
Description
Start DateLast
Certification Dale Pressure Rating Joe)Type
Make
Model
ID N. (I.)
PRange (psi)
TLast Cert Data
Slow Circulation Rates
Pump Number: Make:
Mortal:
Start Date End Dale
Liner Size(In)
Volume Per Stroke Override(bbthadu Max Pressure(psi/
Data Depth (MB)
Slow So
Stickle (am)
P(psi)
EN(%7 0Flow, (go.)
Daily Bulk
Supply Hem Oescrlpdon: Equipment Fuel
Unit Lahel:
cal
Unit St.:I
Note:
Data Consumetl Received
RNurnetl
Cum Consumed
Cum R¢celved
Cu. Returned
Cum On Lac Nolo
1198018 16030 1503.0
12,]00.0
12,70011
00
00
SUppIylMn Omcdopen, Mud Plant Boilers
Unit Label:
Gal
Unit Size:
Note:
Dale Consumed Receivetl
Returned
Cum Consumetl
Cum Received
Cum Returned
Lum On Loc Nme
11/98018 420 420
4200
420.0
00
00
Supply Item Description: Big FUN
Unit Label:
gel us
Unit Blze:1
Note:
ion
Date Consumetl Received
Returned
Cum Consumed
Cum Receivetl
Cum ReNrnetl
Cu. On L. Na[e
11.2018 1,3200 0.0
16,449.0
36,4300
0.0
19,981.0
Supply Item DancHption: Rig water
Uri/Label:
h l
Unit Size: 1
Note:
Date Consumed RanWait
Returned
Cum Consumetl
Cum Received
urn Returned
Cum On Lac Note
1192010 27.0 0.0
44].0
7030
0.0
256.0
SUPPIVRemr Deacripbon: WIFEnters
Unit Label:
Gal
Unit Size:
Note:
Date Consumetl R.ehetl
RNurnetl
Cum Consumetl
Cum Receivetl
Cum Returned
Cum On Loc Note
1192010 1980 198.0
1.880.0
1,980.0
0.0
00
Supply Item Oesertption: WIF Infected DMaN
Unll Label:
Gal
Unit Size:
Note:
Dale Consumetl Runde/ d
ReNrnetl
Cum consumed
Own Receivetl
Cum Returned
C.0
Cum On Loc
11x92018 420.0 4200
3,654.0
3.854.0
0.0
liable
Last Authority Visit
Data Tot lump. NM
Total I.N.C. number ComrMin
1113x2018
BOP Test, AOGCO Jeff Jonas waived wilrress to BOP la t, next last
due 11/1 02 01 8
STOP Cars Submitted
Company
a Role
Cam
Cavan DOIIIng
6
PJSM'S
Doyon Cuba, Inc.
12
Safe Cards
Doyon Cutting, Inc.
6
COW
Doyon Drilling Inc.
6
HRWS
MI Seem
4
HARCIJSA
MI Swam
4
RIR's
General Notes
Comment
Well Name:S-FN7 OR
Wellbore Name: e: SPOS-FNFN7
Well Code: 26944
en i WCER Level
Daily Report
Date: 11/10/2018
Report #: 12
Page: 1 of 2
ll Header
otlConcessl er N° Operator Subs d a ry
SKA ENI PETROLEUM Do
ENI Petroleum Co. Inc pEVELGPMENT WELL
DEVEInstsid LOPMENT
NT
ry, Table Elevation lftl Wafer Depm (ft1 First Flange lftl RKS-Base Flange lftl RKB- Tubing Spod (1U
2 0 00
16.9] 3885 31.74
s
Name
Typtum RtiZ52U Data Rig Release Data
15 GOYON
kAHD RIG W23
ily /nPormation
Weather T-rhaft re PFM Wena Days LTl /days) Y. RI (days) POB
tlY
1]0 E®15 MPH
ety Incidents - Near Miss3as.00 348.00 ]a.D
rSafe4fy,
Category T subtype Sevenmentety
DrillsTyoe
4occur
Last Dete
NextDate
Days Until Nen Check
(tlars)
NilYreO
Grill
1
111312018
11/102018
0
While Tnppng Nil
4
11/102018
11242018
14
Down Dd0
3
11152018
11/12/2018
2
Rig Inspection
1
112/2018
11312019
82
Safety Meeang
12
111102018
11/11/2018
1
Spill onn
12 11/1012018
11/11no18
1
TT H2S Din
2 11MG18
IIIIW2018
0
TT Kick While drilling
311/1012019
2/82019
SO
TT Kick While Tripping
1 11/6/2018
1102018
-3
TT Man Down No
1 11/32018
11/4/2018
6
TT Rig Evacuation Drill
211/&2018
2/6/2019
88
TTWe11KUNN
2 1IM018
Miami)
88
Casings seat
1 11O201a
952019
87
Cas
CONDUCTOp-
Oo lin/
to (in)
Grade
Top
Bo6dmRa)
TVD Sol.
t(ft
Run Date
C lw 180.I 1800 1/12011
133/8 12.42 L60
-0.i 3.909.0 2,452.5 12/192012
CASING 9518 8.84 L-80
0.1 11.989.0 3.985.0 12/302012
LINER 512 4.95 L60
11,]I'D 20,6T5.0
LINER 3,901 0 1/1]2013
3 12
20.618.6 20,8]3.0 3,901A 5212014
Last Cementing
Oemenwg Start pate: 5/12014 String: LINER, 20.873.OftKB Comment: 3.5 X 5.5" he, hanger/ packer set Inside 55' liner. TO liner ® 20,610', ban float
of shoe rp? 208]3'.
Stg Y Top (ftKG) Top Mesa Meq Bon lt[KBI
1 20.618.0 Dpm
20,6]9.0 LB Teal k'nea to 3 00 psi. SLB pump 25 bbls 1e5p MutlPusM1. 25 bbls 15.00 cement, drop 5" will ball, 15 bbls
1 O.Sn MudPush and ng displace cal 184 bots slick water Sting Info finer packer and squeeze cement W 43 bbls of slick
Job Information water. CIP @ 1010 bre.
Job Phaseplannetl SfanOW sun owe End pate P50 Duration (days)
WORKOVER 10130201810:00
10130/101818:00
o.Bg
Daily ummary para#son
241, Forecast
Continue with wall operations suspended waging an SLB casing Patch materials and personnel.
24h summary
Continue with well apsztim s suspended, waiting on SLB casing Patch mwenals and personnel, SIMOPS tlg maintenance.
Operation at 07.08
Continue with —11 donations suspended, in, on SLB caning porch materials ant pereonlrcl, SIMOPS ng makllaren.,
Time Log
Sten End Co. our
Time Time our lar) Ihr) Phase OPr. Act Plan
OOOper. basic,basic,00.0DOM24.00 24 00 W.O. M 23 P COnBnue wai0ng on GLB materials and personnel for casing pelta, SIMCPS Rig pertorming maintenance on mW trough,
as Readings steam system, rod wash cooling system, brackets on mud puma, housekeeping and palnung pmjeds around up.
Avg Background Gas (%j Max Background Gas (%1 Avg Connection Gas (%) Max Connection Gas 1%)
Avg Drill Gas (%1 Max Grill Gas (•hl Avg Trip Gas IY.1 Max Trip Gas 1%)
ily Mud Vo umes
Tank/Addgiun/Loss
TYPe Des
Volume (6611
Tank Active Pils
Hole Hole
Loss Formation
Cumulative Mud Volumes
Alive Volume (ball Hole Volume (bop Adtlitions (bbl) Cum Atlddlons Ibdl Losses Ibdl Cum Losses (bbl)
0.0 11.0
0.0 00 0.0 1.094.9
Daily Contacts
Position
Contact Name
Company
T.U.
Email
ni represeniatNe
David Smith
Eni
Drilling Supv.
office
Mobile
Enl representation
Milch Billington
Ed
Rig Clerk
AKRi9CIeduDdydnl5�enipwrolaum.
90]6850]22
Eni represanfalNa
Pal Ahem
Eni
HSE
om
End redesn onah,
Rale Toups
Em
HSE
Tool Push
Sam Dye
Doyen Name
Field Superintendent
Tool Push
Tool Push
Chad Johnson
potion Drilling
Tool Posher
rigl5�doyontld0g.can
93]685-0716
Risen Panlvatz
Doyon Drilling
Tour Pusher
0,15�doyondnnial, clan
Tool Push
Cliff Canada
Dopn Drilkng
HSE
cowens®dokinddlling.com
605-0795
Tool Push
Dave Sana
Doyon ogling
HSE
tlsene�doyontlnningcnm
Ba5-0]98
Well Name: SP05-FN7 OR
Wellbore Name: SP05-FN7
Well Code: 26944
Job: WORKOVER
WCER Level:
Daily Report
Date: 11/10/2018
Report #: 12
Page: 2 of 2
Personnel Log (POB)
Co."
Sam. Type
Work H lhn
Stand-by H lhr)
Count
Note
Helliburion
Mud loggers
12.50
0
Drilling
Veto Gray
Weigh!
1250
0
Win,
at Swam
Mud Engineer
12.50
0
Dnlling
ASRC
Company Man
12.50
1
Drilling
ASRC
Cork
12.50
1
Drilling
ASRC
SOA
12.50
1
SID Support
ASRC
Crane Advisor
12.50
1
SID Support
Sell Hughes
Baker Hughes Cal
12.50
1
Drilling
eeamn
Medic
12.50
1
SIDSuppan
Doyon
Field Superintendent
12.50
1
Drilling
Northam OiRegd Services
Naler
12.50
1
SID Support
ACS
Enviromenlal
12.50
2
SID Support
Beacon
HSE
12.50
2
SID Support
Doyon
Tool pushers
12.50
2
During
Doyon
we
12.50
2
During
MI Svaco
Mud Pont
12.50
2
Drilling
ARRC
Lagiaf¢
12.50
4
SIDSupmn
MI Seam
WIF
12.50
4
SIDSuppm
Purcell
Sal
12.50
5
SID Support
Jambs
Truck diner/Crane operator
12.50
10
Drilling
ESS
Catering
12.50
10
SID Support
Doyon
Rig Personnel
12.50
22
Dri ing_Talal Drilling Personnel 48
BOP Stack 8 Components
Description
start Date
Last Cottrel n Data Pressure Rating (psi)
Type Make Mochu
ID Nom (in)
P Range (pan Last Cert Date
Slow Circulation Rates
Pump Number: Make:
Model:
Start Date End Date
Lina, St. gin)
Volume Per Stroke Overtax (bbllaik) Max Pressure (psi)
Date
I Depth IMB)
$low Sptl
strokes (ap.)
P(pe)
I ER (%) 1 0FIow(gpm)
Daily Bulk
Supply Rem Description: Equipment Fuel
Ung Label
Gal
Unit Size:1
Note:
Dao Consumed Receivetl
Returned
Cu. Consumed Cum Received Cum Returned Cum On Loc Note
11/102018 1,0830 1,0830
13,703.0
13.783.0 0.0
0.0
Supply lour Description: Mud Rem Boilers
Unit Label
Gal
Unit Size:
Note:
Date Consumed Receivetl
Ret rnual
Cum Consumed Lum Receivetl Cum Rmunretl Cum On Loc Note
11/1012018 42.0 42A
462.0
462.0 0.0
0.0
Supp Item Description: Ria Fuel
Unit Lebed:
gal us
Unit6lze: 1
Note:
Date
Returned
Co. Consumed
Cum Recelved Co. ReNrnetl Cu. On Loc Note
received
11/102010 minions.75.0 0.0
18,424.0
36,430.0 0.0
18,90f>.9
Supplylsan MSCHPtiom Rig Wats
Unit Label:
bbl
UnR51ze:1
Note:
Date consumed ReceNed
Returned Cum Consumed
Cum Received Cum Returned Cum On Loc Note
111402018 440 00
1 491.0
703.0 0.0
212.0
Supply Item Description: WIF Bogers
Unit Label: Gal
Unit Size:
Note:
Deb Consumed ReceNetl
Returned Cum Consumed
Cum Received Lum Returned Lum On Loc Note
11/102018 198.0 1980
2.1780
2,1780 0.0
0.0
Supply Item DescripBon: WIF Injected Diesel
Day Label: Gal
Unit Size:
Note:
Date Consumed Received
Returned Cum Consumed
Cum Received Cum Returned Cum On Loc Net.
11/102018 420.0 420.0
dp74.0
4,074.0 0.0
0.0
Last Authority Visit
Dab roc her. Nor
Total I.N.C. number comment
1122018 I I
BOP Test, AOGCC Jeff Jones waived witness to
BOP test next test
due 11nW2018
STOP Cards Suhmrtted
Company
0Spta
Com
Doyon Drilling
5
PJSM'S
Doyon Drilling Inc.
12
Safe Cards
Doyon DnOing Inc.
5
cow
Doyon Drill Inc.
5
HRWS
MlSliru
4
HARCIJSA
Ml Sen
4
RIR's
General Notes
Comment:
Well Name:S-FN7 OR
Wellbore Name: e- SPOS-FNFN7
Well Code: 26944
ra
r�i1 Job: WORKOVER
sn i WCER Level:
Daily Report
Date: 1111112018
Report #: 13
Page: 1 of 2
Well Header
PandliConcession N°
Operator Smashes, Initial Lahee Code
AUSKA
ENI PETROLEUM ENI Petmlaum Co. Inc. DEVELOPMENT WELL
Rotary Tame Elevation (ft) Watar DapM (k) F851 Flange (hl RKB ..an Flange (tt) FormsTubing Spool (k)
53 62 0.00 16.9] 36,65 31.74
Rigs
Rig NameConkactu Fla Type Rig Num Rig 5ad Date Rig Release Date
RIG 15 DOYON LAND RIG 0723 14/252017
Daily Information
W..Mer Temperature R -F) Wind Days Ln (days) Days RI (days) POB
Overcast 14.5 ENE @27 MPH 34900 349.00 ]3.0
Sall Incidents - Near Miss
Data Category Type Subtype Severity Cause Lost dmei
Comment
Safety Drills
Days Until Next Check
Type
AOR.' LastDate
Next Data
(day.)
Authority Visit
1 1IM2010
11/10/2016
-1
Fire Drill
4 111102018
112412018
13
lock While Tripping Nil
3 11IW2018
11/12/2018
1
Man Down Drill
1 11220118
1/312019
81
N, Instead.
13 11/112018
11/12/2018
1
$duty Meering
13 111112018
111122018
1
Spill Drill
2 11192018
111IW2018
-1
TT H2S Drill
3 111102010
WM019
89
TT Kick While drilling
1 111812018
112/2018
4
TT Kkk While Tripping
211111ANa
11/122018
1
TT Man Down Drip
3 10112018
11/122018
1
TT Rig Evacuation Drill
2 11 WO18
2512019
07
TTWall Nit DSII
1 119201e
VS12019
86
Casings seat
Cas. Type
OD (in)
ID (In)
Grade
I Top MNS)
I Bottom (kK61 1 TVD Bot. (ftKB)
I Run Date
CONDUCT
"No Rd0
1112011
CASING
1335
12.42
L-00
-01
3.909.0 2.452.5
1VIW012
CASING
9518
8.84
LA0
0.1
11.989.0 3,895.0
12/302012
LINER
512
4.95
LA0
11.]]1.0
20.8]50 3,901.0
1/1]2013
LINER
3112
20,616.6
20,6730 3.01.4
5/312014
Last Cementing
Cementing San DMR: 51712014 SMng: LINER, 20,673gMIS Comment 3.5" K 5.5" Inver hanger/ packer set inside 5.5" liner. TO her @ 20,6181 mm of float shoe @ 20.673'.
Sig #
Top RttKB)
Top Was Mein
Bhn jil
I Com
t
20.618.0
20,6]3.0
SLB Test line. t0 3500 psi. SLB pump 25 table Wild MudPush, 25 table 158# cement drop 5" wiper ball, 15 bbls
10.5# MudPush and rig displace w/ 184 table slick water. Sling into liner packer and s0ui ue cement w143 this of slick
water. CIP @ 1010 hre.
Job Information
Job Phase Planned San Dab Sart Data End Deft PSO Duradon(days)
WORKOVER 105M01818:00 10p020181800 0.00
Daily Summary opeagamorris
24h Forecast
Continue with well operations suspended waiting on SLS casing patch materials and personnel.
24h Summary
Continue with well operelions succeeded, wailing on SLB chains patch materials and personnel, SIMOPS rig maintenance.
Operation at 07.00
Continue with well operations suspended, waiting on SLB casing patch materiels and perspnnei, SIMOPS rig maintenance.
Time Log
sun
End
Co. D
Time
Time
DurbN
Mnur
Phase
I Op, I
Act. I Plan
Oper. Dec.,.
00.00
0000
2400
24.00
W,
M 23
P
CwBnue waiting on SLB mapords and p...W for casing patch, SIMOPS Rg perfuming m (mica nes on auction linksges
1 1
1
In pBs, aceumorator jumper hoes, sump Brat ng, mud pump rad wash ending system, agdal dean and paid Mound dg,
housekeeping.
Gas Readings
Avg Background Gas R%)
Max Background Gas (%)
Avg Connemean Gas (%)
Max Connection Gas (%)
Avg Drill Gas I%)
Max Will Gas (%)
Avg Trip Gas(%)
Max Trip Gas I%)
Daily Mud Volumes
TanklAtldlthnfins
Type
Des
Volume MbB
Tank
gckve Rte
Hole
Hoa
Loss
Formation
Cumulative Mud Volumes
Active Volume (bM) Note Volume ball AMldow (bed) Cum Additions (bbl) Losses (bbl) Cum Lwece tbM)
On 0.0 D,0 0.0 Job 1,094.9
Daily Contacts
Position
Contact Name
Company
Title
Emalh
Oeke
Mobile
Em representative
David Smith
Em
Drilling Supv.
Eni representative
Mich BIIlingtpn
Eni
Rg Clark
AKRigClerksDoyonl 5@enipelmisum.
907685-0722
Eni repmsenalwe
PMAhem
Ed
HSE
Ed represenafne
RRw Toups
Ed
HSE
Tod Push
Sam Die
Doyen Drilling
Field Suwrintendenl
Tod Push
Chad Johnson
Doyon Dolling
TOOI Pusher
rigl5®doyandrillin8com
907685-0716
Tool Push
Ryan PaMrea
Dayan Drilling
Tour Pusher
rig15@doyonddlling.wm
Tod Push
Clift Owens
Doyon Billing
HSE
covens@doyonddlag.com
685-0796
ToolPush
Dave Sew
Doyon timing
HSE
dsena@do ndriking.com
885-0796
Well Name: SP05-FN7 OR
Wellbore Name: SP05-FN7
Well Code: 26944
Job: WORKOVER
WCER Level:
Daily Report
Date: 11/11/2018
Report #: 13
Page: 2 of 2
Personnel Log (POB)
Company
S., Type
Work Hine) Skena.by H(nj
Count
I Note
Halkburton
Mud loggers
1250
0
Drilling
Voce Gray
Wellhead
12.50
0
Drilling
MI SWaco
Mud Engineer
12.50
0
Dung
ASRC
Company Mae
12.50
1
Wiling
ASRC
Clerk
12.50
1
Drilling
ASRC
SOA
12.0
1
SID Support
ASK
Crane Advisor
12.0
1
SID Support
Baker Hughes
Baker Hughes Cenirlill
12.50
1
Drilling
Beacon
Medic
12.50
1
SID Support
Doyon
Field SupenMendenl
12.50
1
Drung
WMarn Oi uld Sadness
Fuser
12.0
1
SID Support
ACS
Environmental
12.0
2
SID Support
Beacon
HSE
12.0
2
SIDSupport
Onion
Tad pushers
12.50
2
Drilling
Doyen
HSE
12.50
2
Dolling
Ml evince
Mud Plant
12.50
2
Dolling
ASRC
Logistic
12.50
4
SID Support
MI Sees.
WIF
12.50
4
SIDSupport
Purcell
Security
12.50
5
SIOSUPPort
Jambs
Truck drive/Crane operator
12.0
10
Drilling
ESS
CUM,
12.50
10
SID Support
Doyon
Rig Personnel
12.50
22
Orging_TDtel Drilling Personnel 48
BOP Stack 8 Components
Description
Start Date
Last CorbBcamm bate Pressure Rating ("I)
Type Make Model
ID Nan (in)
PRange UnitLast
Cert Date
Slow Circulation Rates
Pump Number: Make:
Model:
Start Date End Gate
Liner Size (MI Volume Per Stroke Override (bblla&) Max Pressure psg
Date
Depth (hKB)
Slow Spl
Stmkes(spm)
P(psi)
Ea (X) OFlow (gpm)
Daily Bulk
Supply lame Description: Equipment Fuel
Unit Label:
Gal
UntSIze:1
Note:
Dae Consumed Receivetl
Returmtl
CUm Consumed Co. Received Cum Returned
Cum On Loc Note
111112018 13340 1,334.0
15,117.0
15,1170 CO
0.0
Supply lam Descrip8on: MW Plain Soikas
Unit Label:
Gal
Unit Size:
Note:
Da- Consumetl Received
Returnetl Cum Consumetl
Cum Received Cum Retumetl
CUM On Loc Note
11/1112018 42.0 420
504.0
504.0 (0
00
Supply Item Descdptlon: Rig Fuel
Unit Label:
gal us
Unit Sea:1
Not:
Dab ConsumetlReceivetl
Returned
Lum Consumed
Cum Received Cu. Returned
Cu. On Lm Note
11/112018 1,9500 0.0
20,3]4.0
36.430.0 0.0
16,0560
Supply lam Disclpeon: Rg whoa
Unit Label:
bbl
Unit Bizet
Note:
Dae Consumed Becomes!
Returned
Cu. Consumed
Cum Resolved Cum Returned
Cum On Lee Note
111112018 34.0 00
525.0
7030 00
178.0
Supply Oem DesalpBon: WIF Boilers
Unit Label:
Gal
unit Size:
Note:
Dae Consumed Received
Retueretl
Cum Consumetl
Cum Received Cum Returned
CUm On Lx Note
11/112018 198.0 1980
2,3760
2,3760 0.0
00
Supply lam Description: WIF Infected Diesel
UnNLabel:
Gal
Unit Size:
Note:
Date Consumetl Received
Returnetl
Cum Consumetl
Cum Receivetl Cum Returnetl
CUm On Lac Nae
11/1112018 4200 420.0
4,494.0
44940 0.0
0.0
Last AUMOnty Visit
DateTot USP. Nor
TOMI I.N.O. number Comment
11212018
BOP Test, AOGCC Jeff Janna hived answers,a BOP test resat lest
due i f/102018
STOP Cards Strcorded
Chip Perry
B pipes
Can
Doyan Dnlling
5
PJSM'S
Doyon Drilling Inc.
8
Sate Cards
Wynn Drilling Inc.
5
COW
Wyon Drilling Inc.
5
HRWS
Ml Swede
4
HARCNSA
Ml Swam
4
FiRs
General Notes
Comment
Well Name:5-FN7 OR
Wellbore Name: e: SPOS-FNFN7
Well Code: 26944
Job: WORKOVER
ani WCER Level:
Daily Report
Date: 11/12/2018
Report #: 14
Page: 1 of 2
Well Header
PermUConcesslon N° Operator SubsidiaryInitlal L"N" Code
ALASKA ENI PETROLEUM ENI Petroleum Co. Inc. DEVELOPMENT WELL
Rotary Table Elevation (k) Watet OepM (R) First Range (ft) We -Base Ran, In, KKB- Tubing Spool(k)
5362 000 16.97 36.65 31.74
Rigs
Rig Nam , Cpn wr Rig Type Rig Num Rig Start Data Rig Release Date
RIG 15 MYON LAND RIG 0]23 12/25201)
Daily Information
weather Temperature ('F) Wind Days LTl(days)mys RI (days) POB
Cloudy 65 NE®10 MPH 350.00 35000 )t0
Sa ery Incidents - Near Miss
Dab Category Type Subtype averiry Cause Lost time?
Comment
Safety Drills
Days Unfit Next Check
Type
ly Moo,
Last Date
Next Date
(days)
T.thodly YaM
t
11131201811/10/2018
.2
Fire Drill
4 111IW2018
11242018
12
pick While Tripping 0611
3 11/512018
111122018
0
Man Down Dri0
1 1122018
113112019
80
Rig Inspection
14 111122018
11/1312018
1
Safety Mouth,
14 11/12/20183M18
Spill Drill
3 11/12x1018
11282018
14
TT H2S Drill
3 11/102018
2/812019
as
TT Kok Wells drilling
1 1152018
i1n12018
5
TT Kick While T6,eng
2 11/11/2018
11/12/2018
0
TT Man Down Drip
3 11111/2018
11/1212018
0
TT Rig Eva..Imn Drill
2 11/82018
252019
%
TT Snipping doll
1 11/122018
vim 19
GO
TT Well Kill Drill
1 11n12018
2/512019
85
Casings seat
OO (in)
ID(In)
Grade
Top(ftKS)
eattem(RKeI
TVD Bob(kKB)
Run Date
160.0
1001112011
ri
1335
12.42
LA0
-01
3.909.0
2,452.5
12/1912012
955
8.84
LA0
0.1
11,9890
3995.0
1W[12012
512
4.95
L-80
11,))1.0
20,6)5.0
3,9010
1/1712013
312
20,616.6
20,873.0
3,901.4
5132014
Last Cementing
Cementing Stert Dale: 5n 014 StringLINER, 20.6) . Comment. 3. X 5.5" liner Hanger pec er set inside 5.5' liner. Ener @ 20.610, can o oat shoe 20673.
S[g p Tap Hole) Top Meas Meth Bbn (irl Com
1 20.610 0
20.8)3.0
SLB Tesf final to 3500 psi. SLB pump 25 We 10.5p MudPush, 25 bola 15.810 cement, dmp 5' vapor bell. 15 obis
10.5-6 MUtlPush and rig displace wl 184 bons slick water. Sling into liner packer and aqueous cement w/ 43 bola of slick
water CIP ®1010 his
Job information
Jab PM1ase Planned Skirt Date surf Dab End Data Pyo Duration (days)
WORKOVER 10/30201818:00 10/30201818:00 0,00
Daily Summary uperations,
24h Forecast
Continue with well operations suspended war ing on SLB casing patch materials and personnel.
24h Summary
Continue with well operations suspended, wailing on SLB rasing Patch materials and personnel. SIMOPS rig maintenance.
Opar.u. at 0).00
Continue with well operations auspeMed, waiting on SLB razing patch materials and para mus, SIMOPS ng makdarence.
Time Log
$letl
End
cum Dur
Time
I Time
Cur(M)
(hr)
'An.Op.
AR
Plan Oper. Dan.,
00:0000'.00
24 00
24 OD
W.O.
M
23
p ConOnue waiting on SLB materials and parsomrel m cedt.g patch, SIMOPS Rig performing maintenance on insulation
I
shea@Ing an steam lines, demos inspection including all bolts kaapea and Grandame, mud pump and rn fin, system, clean,
prime and paint around rig, housekeeping_
Gas Readings
Avg Background Gas (%) Max Background Gas I%)
Avg Connection Gas (%)
Moa Connection Gas (%)
Avg Una Gas (%1 u Max 0.111 GPh)
Avg Trip Gas (%)
Max Trip Gas (° )
Daily Mud Volumes
rarAdAdalnonlLoss
rype De,
Vol...(lal
Tank
le Pits
Hole
Ho
Hole
Ho
Loss
Fomanon
Cumulative Mud Volumes
Active Volume (bbl) Hole Volume (bbl) Additions (bbl) Cum Addition$ (bbl) Losses (bb0 Cum Losses (bbl)
0.0 0.0 0.0 0.0 0.0 1,094.9
Daily Contacts
Position
Contact Name
Company
Tilde
Email
Deice Mobile
Em napresemaG;
D,Vk Smith
Eni
palling Su,
Ere AspmsenlaMe
MMM Bandon
Eol
Rg Clerk
AKRigCteriaDoynnl5�enipatmlaum.
90)-6960]22
Eni rapatentalrve
Pal Ahem
Eni
HSE
cons
Eni repreaentalive
Rene Toupa
Ed
HSE
Tool Push
Sam Dya
Doyon Dnlihg
Field Superintendent
Tool Push
Chad Johnson
Doyon Drilling
Tool Pusher
ngl5itdopod rif ing.cpn
907-685-0716
Tool Push
Ryan pardmM
Doyon Drilling
Tour Pusher
1gl51lttlo,ondnein,toon
Tod Push
CIMI Owen,
Doyon ON line
HSE
cowend@doundiffling.com
685-07%
Tad Purh
Dave Sena
Doyon Who,
NSE
asena@do ddhing.com
605-0796
Well Name: SP05-FN7 OR
Wellbore Name: SP05-FN7
Well Code: 26944
Job: WORKOVER
WCER Level:
Daily Report
Date: 11/12/2018
Report #: 14
Page: 2 of 2
Personnel Log (POB)
Company
Ser¢Type
Werk Hllrr)
Stand-by H(hr)
Count
Note
Baker Hughes
Baker Hughes CmInIlft
12.50
0
Drill,
Haihbuoon
Mud loggers
12.50
0
Drilling
Velco Gray
Weebead
12.50
0
Drilling
MI Swaco
Mud Engineer
12.50
0
Drilling
ASRC
Company Man
12.50
1
Drilling
ASRC
Clerk
1250
1
Drilling
ASRC
SOA
12.50
1
SID Support
ASRC
Crane Advisor
12.50
1
SIDSupport
Boston
Medic
12.50
1
SIO Support
Doyon
Field Stuselp oodent
12.50
1
Drilling
Northern OWN Services
Foster
12.50
1
SID Support
ACS
Envimmentil
12.50
2
SO Support
Beacon
HSE
12.50
2
SID Seppod
Dayan
Tool pusM.
12.50
2
Doling
Wynn
HSE
12.50
2
Drilling
MI Swam
Mud Plant
12.50
2
Drilling
ASRC
Logistic
1250
4
SID Support
Ml Sams.
WIF
12.50
4
SID Support
Purcell
Security
12.50
4
SIDSupport
Jacobs
Truck driver l Crane operator
12.50
10
Doll.g
ESS
Craning
12.50
10
SID Supow
Doyon
Rig Personnel 1
12.50
1
22
Drilling Total Drilling Peramnel41
BOP Stack B Components
Description
Start Do*
Last Certifkadon Date Pressure Rating (psi)
Type Make model
ID Nan (InI
P Range (psi) Last Cert Data
Slow Circulation Rates
Pump NMMer: Make:
Madel:
Start Data Entl Date
Liner Size Ii.)
Volume Per Stroke Override (bolls*) N" Pressure(psi)
Dale OepIM1 (ttKBl
Slow Spd
Strauss (a")
P(put
Ell (%) 0Flow(gpm)
Daily Bulk
Supply Item Description: Equipmen( uei
UMILabel:Gal
Unit9ize:1
Note:
Datu Conmetl Receivetl
Returnetl
Cumsumetl
u,m ReceivetlIC
Note
1,5680
.
18,IVIV2010
5.0
00
0J)
Supply Item Description: Mud Plant Boilem
Unit label:
Gel
Unit Size:
Note:
Date Consumed Recetried
Returned
Cum Compound!Gum
Receivetl
Cum Returnetl
C. On Loc Note
11/12/2010 azo 42.0
546.0
546.0
0.0
00
Supply Ibm Description: Rig Fuel
UMt Label
gal us
Unit Size: I
Note:
Wee Consumetl Receivetl
Returned
Cum Consurred
Cum Received
Gum Raturmtl
Cum On Loc Note
11112(2013 19690 0.0
22.343.0
36,4300
0.0
14,087.0
Supply Mm Deserlptian: Rig Water
UnItkabel:
bol
Unit Bize: t
No.
Date Consumetl
Receivetl
Returned
Cum Consumetl
Cum Received
Cum Reeunretl
Co. On Lac Note
1102/2010 57.0
1350
5820
838.0
00
256.0
Supply Item Description: WIF Balers
Unit Label:
Gal
Unit Size:
Note:
O%Oah Consumed Received
Returned
Cum Consumed
Co. Receivetl
Cum Returned
Cum On Los Note
go10 190.0 1980
2,5740
2574.0
0.0
OA
Supply lMn Description: WIF Injected Diesel
U. Label:
Gal
Unit Sim:
Note:
Date Consumed Receivetl
Returnetl Cum Consumed
Lum Rxeved
Cum Returnetl
Cu. On Lac Note
11AM018 336.0 336.0
4,830.0
4,830.0
00
0.0
Last AUVIOUly Visit
Date Tot map. Nor
Total I.N.C. number Cornmeal
1 V32010 I I
I BOP Test, AOGCC Jett Jones waived witness to BOP last, nest *at
due 1111/12010
TOP Cards Submitted
company
IF Rots
can
Doyon Coding
7
PJSM'S
Doyon Ddning Inc.
9
Safe Cards
Doyon Detling m,.
7
COW
Doyon Dolling Inc.
7
HRWS
Ml Swaco
4
HARCIJSA
Ml Swaco
4
Mire
General Notes
Comment
Well Name:S-FN7 OR
Wellbore Name: e: SPOS-FNFN7
Well Code: 26944
BTrA�e Job: WORKOVER
DCII IIII WCER Level:
Daily Report
Date: 11113/2018
ReportA: 15
Page: 1 of 2
Well Header
Pematiconcession N° Operator Subsltlbry Initial Lahee Code
ALASKA
ENI PETROLEUM ENI Petroleum Co. Inc. DEVELOPMENT WELL
ea
Rotary Table Elevation(R) Water Deptr IN hard Flaange(ft) RKS-Base Flange(ft) RKB-Tubing Spool(ft)
$362 0.00 36ss 31.]4
Rigs
Rlg Name Contraeror Rig Type Rig Num Rlg SeaK Date Rig Release Dale
RIG 15
DOYON LAND RIG 0]23 11251207,
Daily Information
Weather Temperature (°F) WInO Oays LTl (days) Days R.(drysl POB
ear J ] NE 12 MPH 351.00 351.00 72.0
Safety Incidents - Near M/ss
Data Category Type Subtype Seventy Cause Lost time?
Comment
Safety Drills
TYPa
Days Until Next Check
AUMonry Ysi[
aoccur
Last Date
Next Date
(days)
Fire DOII
1
1192018
11/102018
-3
Kkk While Tapping Drill
4
11/1M2018
112412018
11
3
11512018
11/1212018
.1
Man Dawn NO
1
i1n o10
11312019
79
Rig Inspection
15
11/1312018
11/14/2018
1
Safely Meeting
15
1111312018
11/14/2018
1
I2S
3
1111 mole
1120,9018
13
TT
Ti H25 Drill
311/10,2018
282019
87
TT Kick While drilling
1
11512018
11!//2018
{
TT Kkk While Tapping
2
111112o18
11/12/2010
.1
TT Man Down Dall
3
11/1112018
11/112018
.1
TT Rig Evacuation Drill
2
11182018
2612019
SS
TT Skipping drill
2
111132018
2/112019
tip
1
11n2o04
eat
ype
OD (in)
to(in)
Grade
Top (ftKB)
BOKam(RHB)
TVD eor(RK.i
rn1whna
133/8
1242
L-80
-0i
160
3.909.0
1600
2,452,511/1&21112
1112011
95/8
884
L-80
0.1
11,9890
3,995.0
1290,2012
51/2
4.95
L-80
11]]10
MAT5n
3,9010
1/1]12013
3112
20,616.6
20,6]3.0
3,901.4
592014
nting
Cementing Start Date: 014 stnmJ: LINER, 0.6]3Aw Comment: 35"x 5-5" liner ranged Packer set inside 5.5- finer. TO liner @ 20,618', lkn of post shoe
at, p I Top (One)
Top Meas Meth
a" (hil
Com Com
20.618.0
1lnformatien
20, 3.0
SLS Test lines to 35W psi. SLB pump 25 bbl. 10,U df 25 obis i5.8k cement amp 5" wiper ball. 15 Ells
10 SA MUdP ah and d9 displace w/ 184 able slick water. Sling into liner packer act squeeze cement wl 43 EMs M slick
water. C]P @ 1010 hm.
Job
Job Phase planned send Date Start Dab End Data PSD Durationda
Weaken(data)
WORKOnIER lwI ol8 Is 00 10130201818:00 060
Daily Summary Operations
24r Forecast
Continue with well operations suspended washing on SLB casing patch materials and personnel.
To Summary
Continue with well openaWns suspended wading on SLB casing patch materials and pemonnel, SIMOPS ng hainlenarco.
Operation at 07.00
Continue with well operations suspended, waiting on SLB rasing patch materials a" personnel. SIMOPS rig maintenance.
Time Log
start
End
Cum Dur
Time
Time Our in
e)
Phase
Opr.
Act
plan
Door. Dena.
0000
00:00 24N
2400
W.O
M
23
Genome waiting on SLB matedals act pemoncasingSIM
PS far parch, SIP RN pedprmeman
iny mtence Inspection on
1
mud Dib suction linkage. grafin, in pits, Quin fall beams, repair heafercere 0 meaenme, fab cempmanh for must pump rad
cooling system, ren corMuil for LED Bights, dean. prime add RIM around rig, i dusekeepin,
Gas Readings
Avg background Gas (Na
Max Background! Gas (%)
Avg Connection Gas (%)
Max Connection Gas (%1
Avg Onll Gas (%)
Max Drill Gas (%)
Avg Tnp Gas (%)
Mex Trip Gas (%)
ally Mu Volumes
Tank/AddhiaMLps
Type
Des
VOWme (boll
Tank
Active Pits
H°Ie
Hole
Loss
Formation
Cumulative Mud Voiumes
Active Volume Into Hole Volume (bbl) Additions (bo)Cum Additions (bbl) Losses (6617 Cum Losses (bop
000
00 O.o 00 1,0949
Daily Contacts
Position
Contact Name
Company
Title
Email
ORice
Mobile
Eni representative
David SmOh
End
Dulling Supe.
Ed representative
MBch SIIOngton
EM
Rig Clerk
AKRigCkmx Doyanl5@enipwadaum.
907,685-0722
Eat mpresentalrve
Pat Ahem
EM
HSE
earn
Em representative
Rene Taupe
Eni
HSE
Tool Push
Sam Dye
Doyon Drilling
Field Superintendent
Tod Push
Chad Johnson
Doyon Drilling
Tool Pusher
rigl5&oyondnlling can
907685-0716
Tool Push
Ryan Parti
Doyon Drilling
Tour Pusher
rgi5litdopridinfle,cem
Teel Push
CIM Owens
Doyon Onlan9
HSE
coveens@doyondMling.com
6850796
Tao] Push
Dave Sena
Doyon DMOn9
HSE
d.ena®doyoMnllingcont
6850796
Well Name: SP05-FN7 OR
Wellbore Name: SP05-FN7
Well Code: 26944
Job: WORKOVER
WCER Level:
Daily Report
Date: 11/13/2018
Report #: 15
Page: 2 of 2
Personnel Log (POB)
Company
Sam. Type
Work H (hr)
Stand-by H (m)
Count
Note
ASRC
Company Man
12.50
1
Dining
ASRC
Clark
12.50
1
Dulling
ASRC
SOA
12.50
1
SID Support
ASRC
Crane osor
12.50
t
SID Support
Beacon
Medic
12.50
1
SID Support
Doyon
Frets Superintendent
12150
1
Dulling
NoMem Odfuld Semiwr
P.M.
12.50
1
SID Support
Little Red
Pumping
12.50
1
Diking
ACS
nowminenlal
1250
2
SID Support
Beacon
HSE
12.50
2
SIDSupporl
Doyon
Toolpusbem
12.50
2
Dnllmg
Doyon
HSE
1250
2
Dnllmg
MI Swam
Mud Plant
12.50
2
Dnlling
ASRC
Logistic
12.50
4
SID Support
W Gera.
WIF
'12.50
4
SID Support
Purnell
Security
12.50
5
SID Support
ESS
Grinning
12.50
9
SID Support
Jacobr
Truck Eder/Crane operator
12.50
10
Driing
Olson
Rig Personnel
12.50
22
Dnlling Total Drums Personnel 42
BOP Stack B Components
Description
Start Data
Last Cermilor on Dale Pressure Rating (pap
Type
Make Motlel
ID Nom (in)
P Range (psi)
Last Cen Dare
Slow Circulation Rates
Pump Number: Make:
Model:
Stall Data End Data
Liner St. Qml Volume Per Stroke Dvenitle(hand) Max Pressure (psi)
Dare Depth IRKS)
Slow Sptl
SUokes(spm)
P(PI)
En ( -Q
aFlow (gpm)
Daily Bulk
Supply Item Description: Eauipmenl rual
Unit Label:
Gal
Outsize:1
Noe:
Dale Consumed Recelvetl
Returned
Gum Consumetl Gum Received Cum Ratumetl
Cum On Loc Note
111132015 1,5960 1,598.0
18,281.0
18,281.0 0.0
0.0
Sooty Ibwl Description: Mud Plant Salinas
Unit Label:
Gal
Unit Size:
Note:
Da[a Conaumed Recelved
Returned
Cum Consumed Lum Receivetl Gum Returned
Cum On Lac Note
1111312010 42.0 420
588.0
5880 00
00
SupplyldmD dption: Rig Poet
Unit Label:
gal us
Unit Sun I
Note:
Data Consumetl Receivetl
Returned
Cu. Consumed Cu. Received Cum Remrnetl
Cum On Loc Note
11/13/2010 2,065.0 0.0
24,428.0
36,430.0 0.0
12,002.0
Supply learn Deectlptlpn: Mg Wake
Unit Label:
bbl
Unit Size: i
Nom:
Data Consumed Receivetl
Returned
Cum Consumetl Cum Receivetl Cum Remrnetl
tum On Lac Note
11/13/2018 350 0.0
61].0
838.0 0.0
221.0
Supply Nem Desoiption: WIF Bollars
UMl Label:
Gal
Unit Size:
Note:
Dairy Consumed Recelvetl
Returned
Cum Consumetl Cu. Received tum Returned
Gum On Loc Nora
11/1312018 198.0 198.0
2,]i2.0
2,]]20 0a
00
Supply Rem Description: WIF Injected
Dreael
Unit Label:
Gal
Unit Size:
Note:
Orta Consumetl
Racaivad
Returned
Cum Consumed Cum Received Cum Returned!Lum
On Loc Note
11/1312018 420.0
420.0
5,250.0
5,250.0 0.0
0.0
Last Authority Visit
Date Tot lisp. Nbr
Total I.N.G. number Comment
1113/2018 I I
I SOP Test, AGGCC Jeff Jones waived witness to SOP lest, next test
due 111102010
STOP Cards Submitted
Company
%Rpts
Com
Doyon pillars
]
PJSM'S
Doyon DElgns Inc,
4
Safe Cards
Doyon Doling Inc.
4
COW
Doyon Doling Inc.
4
HRWS
Ml Swam
4
HARCDSA
Ml Swam
4
RIR%
General Notes
Comment:
Daily Report
Date: 11/14/2818
Report #: 16
Page: 1 of 2
Well Header
Well Name: S-FN7 OR
ALASKA ENIPETROLEUM ENI Petroleum Co. Inc. DEVELOPMENT WELL
Wellbore Name: me: SPO5-FNFN7
53.62 0.00 ifi.9] 3655 31.74
Well Code: 26944
eni
Job: WORKOVER
Daily information
WCERLevel:
Daily Report
Date: 11/14/2818
Report #: 16
Page: 1 of 2
Well Header
PermiVConcession N° Operator Sub Idlary In]tial LaM1ee Code
ALASKA ENIPETROLEUM ENI Petroleum Co. Inc. DEVELOPMENT WELL
Rotary Table Elevation (ft) Water Depth IN) Flrat Flange(ft) RKB-Base Flange (it) RKB-Tubing 6peol(it)
53.62 0.00 ifi.9] 3655 31.74
Rigs
Rig Name Contend Rlg Typo RlI Num Rig Start Dap Rig Release Data
RIG 15 DOYON WIO RIG 0]23 12/25201]
Daily information
Weather Temperature ('F) Wind Days LTl (days) Days RI (days) POB
Clear -94 8 Q 6 MPH 35200 352L0 72D
Safety Incidents - Near Miss
Date Category Type Subtype lament, Cause Lost time?
Comment
Safety Drills
Days Until Next Check
Type
#Occur
Last Date
Next Date
ltlays)
Authorityvisit
1
1IM2018
11/1012018
4
Fire Dult
6
lllIO2018
1128/2018
14
Kick While Tripping Oil
3
111512018
11/12/2018
-2
Man Down Dnll
1
1122o18
11312019
78
Rig Inspection
16
11/142018
11115(2018
t
Safety Mean,
16
11/142018
111152010
1
Spill Deal
3
1111MO18
11saii
12
TT 112S Dnil
3
11/102018
2/82019
86
TT Kick Waite cint ins
1
11512010
112/2018
-2
TT Kick While Tripping
2
11111IM18
11/122018
-2
TT Man Down Or k
3111=18
11/122018
-2
TT Rig Evacuation Old
2
11182018
252019
84
TT Sbippng di2
lllIM018
2/112019
69
TT Won Kill Drill
1
11n2018 2/512019
83
Casings seat
Cas. Type
OD lin)
10 si
Grade TOP(f )
Bottom
I TVD Sot. lose)
I Run Data
CONDUCTO
16 .0
160.0
11112011
CASING
13318
12.42
L-80 -0.1
3.9090
2,4525
121122012
CASING
9518
0.04
L-00 0.1
11.9090
3,995.0
121302012
LINER
512
4.95
L-80 11,]]10
20,6750
3,901.0
11172013
LINER
312
20,616.6
20,873.0
3,901.4
SWO14
Last Cementing
Cementing Start Date: 5/]12014 Stang: LINER, 20.573 ORKIB Comment: 3.5" %5.5" liner M1angerl packer set Inaitle 5.5"firer. TO liner ®20.618', chn of Sod shoe
Stg#
Tpp(RK6)
Top Meas Meth
Ban(ftKB) Com
1
20.618.0
20,6130 SLB Ted lines m 3500 psi. SLB pump 25 bbis 10.50MudP.ah, 25 table 15.8# cement, drop 5" wryer bell, 15 able
10.5# Mu iPush and ng displace w1184 bbis slick water. arms into firer packer and Mueeze cement w/ 43 table of slick
water. CUP ®1010 his.
Job Information
Job Phase Planned Start Date Start Data End Dap Paid Duration (days)
WORKOVER 1W30201810:00 1050201818:00 0.00
Daily Summary Operations
24M1 Forecast
Continue won well operations suspended wafting on SLB misiag patch materials and personnel.
24h Summary
Continue with well operelloes suspended, wainp on SLB casing Patch materials and persmrel, SIMOPS rig maintenance.
operation at 07.00
Continue with well opembions suspended, weaken, on SLB mining patch materials and persamrel. SIMOPS its maintenance.
-Log
T-19
Stan Ene
I
Co. our
Time Time
Dur(brl
In,)
Phase
I Opr. I
AcG
I Plan
O'er. Oescr.
00:00 00:00
24 00
24.00
W.O.
M 23
P
CanBhe. ..an on SL materials and personnel far =me patch. SIM P Rig perprmar, maintenance 8 impsdion on
mud tails suction linkage, grating in pits. Main fill heama, repa4 M1eder core In me7ranine, fan mmponenh for mud pump ratl
morins system, min contlwt for LED lights, dean. prime and peid around ng, housekeeping.
Gas Readings
Avg Background Gas (%)
Max Background Gas (%I
Avg Connection Gas (%)
Max Connedicn Gas (M)
Avg Drill Gas 1%) 1
Max Dil Gas (%)
Avg Trip Gas (%)
Max Trip
Daily Mud Volumes
Tank/MdMONLoss Type
Das
Volume(bbi)
Teak Active Pits
Hole Hole
Loss Formation
Cumulative Mud Volumes
Active Vdume (bN) Hole Volume Ibbs) Additions (bid) Cu. Mdkians (bap Losses (ban Cu. Lenses Ibbs)
0.0 0.0 DO 0.0 0.0 1,094.9
Daily Contacts
lomiion
CPntrod Name
Company
Title
Email
Office
Mobile
Eni representative
David Smith
Ene
Drilling Supv.
Bell representative
Wade Thomas
Eta
Rig Clerk
AKMgCleftDayonl S®empetroleum.
90]-685.0]22
core
EM representative
Pal AM1em
Eni
HSE
Ed representative
Rene Toups
End
HSE
Tool Push
Sam Dye
Doyon Drilling
Field Superintendent
Tool Push
Chad Johnson
Doyon Dnlleng
Tool Pusher
ng15®doyoMnlleng mm
907685-0716
Teel Push
Ryan Paduatc
Doyon snake,
Tour Pusher
nglS@doydVklin,dxs
Tao] Push
Cliff Owens
Doyon Diling
RBE
onewa s@doyonddlling.com
685-07%
Too]Push
Dave Sena
Doycn Ddling
HSE
dsena@tliscrunllin,com
685-0796
Well Name: SP05-FN7 OR
Wellbore Name: SP05-FN7
Well Code: 26944
Job: WORKOVER
WCER Level:
Daily Report
Date: 11/14/2018
Report #: 16
Page: 2 of 2
Personnel Log (POB)
Company
Sere. Type
Work H (hr)
Stend4ry H (hr)
Count
Note
ASRC
Company Man
12.50
1
Drilling
ASRC
Clerk
12.50
1
Dulling
ASRC
SOP
12.50
1
SID Supporl
ASRC
Crena Adorn,
12.50
1
SID Support
aeamn
Madic
1250
1
SID Support
Doyon
Field Superintendent
12.50
1
Dtlting
Northam Oilhold Semoss
Fue er
12.50
1
SID Support
Little Red
Pumpnlg
12.50
1
Dolling
ACS
Enviromental
12.50
2
SID Suppon
Beacon
HSE
12.50
2
SID Support
Doyon
Tooipushem
12.50
2
Dulling
Doyon
HSE
12.50
2
Dulling
MI Swam
Mud Plant
12.50
2
Drilling
ASRO
Logistic
1250
4
SID Support
Ml Swam
WIF
12.50
4
SIDSwUU1
Purcell
Security
12.50
5
SID Suppon
ESS
Catenng
12.50
9
SID Suppon
Jacobs
Tmck dove, l Ce. .,.Or
12.50
10
Doling
Doyon
Rig Personnel
12.50
22
Drilling Total Only, Personnel 42
BOP Stack 8 Components
Description
Stan Daft
Last Certification Date Pressure Rating (psi)
Type Make
I Model
ID Nan (in)
P Ruin, (psi)
Last Cert Date
Slow Circulation Rates
Pump Number: Make:
Model:
Start Date End Data
Liner Size (in)
Volume
Per Stroke Ovemide(bbllsik) Max Pressure(psi)
Data Depth(hRB)
Slow Sod I
Strokes(spm)
I
P(psi)
EN(X) OFlow (gain)
Daily Bulk
Supply Item Description: Equipment Fuel
Unit Label: Gal
Unit Size:1
Note:
Data Consumed
Ram"'k,
Returned Cum conaumad
CUm Received
Cum Returned
Cum On Loc Note
11/142018 1,361.0
1,351.0
1 19,642.0
19,642.0
0.0
0.0
Supply Item Description: Mud Plant
Raters
Unit Label: Gel
Unit 5lze:
No.
Data Consumed Rembeed
Retumetl Cum eonsumetl
Lum Recelvetl
Cum Returned
Cum On Loc Note
11/1412018 42.0 42.0
8311.11
630.0
00
00
Supply Item Description: Rig Fuel
Unit label:
gal us
Unit Size:1
Nate:
Date Consumed Received
Rehrned
Co. Consumed
Lum Remboul
Cum Returned
Cum On Lac Note
11/1412010 2.356.0 B.TOO.D
I
26,]840
43,130.0
OA
16,398.0
SUppIyNem DmcrIpdwn Rig Water
Una Label:
bbl
Unit Size:1
Note:
Doh Consumed RaceWed
ReWrnetl
Cu. Curve umetl
CUm Received
Cum ReWrnetl
Co. On Loc Note
11/1412018 43.0 00
660.0
038.0
0.0
SuPpty Item Description: WIF Boilers
Unit Label:
Gel
Unit Size:
Note:
Date Consumetl Received
Returned
Cum Consumed
Cum Rumored
Cum Returned
Cum On Loc Nota
11/142018 196.0 198.0
2.9]00
0.0
0.0
SupplYllem Desenption: WIFlnjeaad D'msal
Unit Lahel:
Gal
Unit Size:
Note:
Data Consumetl Received
ReYumetl
Cum Consumed
Cum Receivetl
Cum Returned
Cum On Loc Note
11/162018 4200 4211.0
5,0]0.0
5,670.0
0.0
0.0
LastAUVIOCity VISIt
Oace Tot Urine. Me
Total LN.C. number Lamoent
11.18
BOP Test, AOGCC Jeff Jones walked witness W BOP lest, next lest
due 1111012010
STOP Carus Submitted
Com"
N Rpte
Com
Doyon Drilling
3
PJSM'S
Doyon Drilling Inc.
0
Sete Cards
Doyon Units, Im.
3
COW
Outrun Drilling loc.
3
HRWS
Ml Swam
4
RIR'c
Ml Swam
4
HARCIJSA
General Notes
Comment
Well Name: S-FN7 OR
Wellbore Name: me: $POS-FNFN7
Well Code: 26944
Job: WORKOVER
ani WCER Level:
Daily Report
Date: 11118/2018
Report #: 17
Page: 1 of 2
Well Header
PermwConcesstoo N°
Oparabr Subsidiary Initial Lahae Code
ALASKA
ENI PETROLEUM ENI petroleum Co. Inc. pEVELOPMENT WELL
Rotary Table Elevation (tt) Water Dorm fit) had Flange (h) RKB -Base Flange In) RKB-Tubing Spool (tt)
5362 0.00 1697 36.65 31]4
I
Rigs
Rig Name Contrecbr Rig Type RIg Num Rig Start Oab Rig Release pate
RIG 15 00YON LAND RIG 0723 121252017
Daily Information
Weachis Temperabml-F) Wlntl Days LTI(days) Days RI (days) P08
Ctoutly 88 817 MPH 353.00 353.00 70.0
Safe tyncidents - Near miss
Date Category Type subtype Severity Cause Lost time?
Comment
Safety Drills
Days Until Next heck
Type
00ccor
Lest Data
Next Data
(days)
qumority Visti
1
1192018
11IID2018
-5
Fire Drill
6
11/142018
11282018
13
Kick While Th se, Dull
3
11152010
11/12/2018
A
Man Dawn Ong
1
1102018
1912019
77
W9 Inspection
17
11/[52018
111162018
1
Safety Meeting
17
11/152018
111162018
1
Spill Dun
3
11/122018
112&2018
11
TT 80PE Gulf
1
111152018
11292018
14
TT H2S Ong
3
11/102018
2162019
85
TT Kick While drilling
1
1192018
119/2018
41
IT Kick While Tripping
2
11/112010
11/122018
41
IT Man Down Drill
3
1[/112016
11/122010
3
TT Rig Evaceation Dull
2
1102018
2 019
83
TT Slipping did
2
11/132018
2/1112019
88
TT well Nit Drill
1
1102018
2/512019
ez
Casings seat
Cas. Type
OD pnl I
ID (til
Grade
I T-1 ... I
I Bottom IRKBI
I TVD BOG (NKB)
Run Data
CONDUCTOR
1 0
160.0V2014
2011
CASING
13318
12.42
LA0
-0.1
3,900.0
2p52592012
CASING
9518
9.83
L-00
0.1
11.889.0
3,995.0012D12
LINER
512
695
L-00
11'71.0
20.675.0
3,901.012013
LINER
312
20,616.8
20,673.0
3,901.4
Last Cementing
Cementing Start Dee: 5&12014 among: LINER, 20,673.MKB Comment 35" X 5.5" liner hanger/ packer set Inside 5.5 -liner. TO finer @ 20,618', him of float shoe U20 '67T
S[9 k Top INKB) Top Meas Mew Bhn (NRB) I Co.
i 20618.0ZU.673C
SLB Test lines to 3500 psi. SLB pump 25 MIs IDD MWPum, 26 nth 15.80 cement, drop R sonar ball. 15 bay
IDWx MudPush and ng displace wl 184 bbh Wick water. Sling into liner partner and squeeze cement w/ 43 bola of slick
I
water. CIP @ 1010 his.
Job Information
Job Phase Planned Start Dale stag Dab End Date P50 Duratum(days)
WORKOVER I 10130201818:00 1 1119020181800 000
Daily Summary Operations
Wit Fgrecast
Continue with well operations suspended waiting on SLB casing patch materials and personnel.
24h Summary
Continue with well operations suspended, waiting on SLB casing patch materials and personnel. SIMOPS ng maiMenatme.
Operation at 07.00
Continue wnh well operations suspended, waiting on SLB casing patch materials and personnel. SIMOPS hg maintenance.
Time Log
StartErin
Cum Dur
Time
Time
our (hr)
(hr)
IPhase I
Opr. I
Act.
I plan
ON, Dinim.
0000
2400
4.
23
P
pnenue waiting an LB mabriah entl pereorme rcpo., patch, SHMOPS Rig prolamii, rarrinvermice 8 inspection on
100:0
1
IW'D. Iss
mutl Dits suction linkage, gratbg In Dill. Mein fell beams, repair heater ea<In meaarme, fab components for mud pump roti
cooling system, mn antluit for LED Ighia, tlean, Dema and paint around M. housekeeping.
perabon
from
00:00 to 06:00
stare
ens
cum our
Time
rime
Duryhrl
kr)
Phase I
Our. I
Act.
I Plan
Oper. Descr.
00:00
011:00
24.00
216.00
W.O.
M
23
P
Cenrinue waning on6LB memories and patrsonnel for casing patch, SHOOTS Rig performing maintenance 8 inspection on
1
mud pits suction linkage, grating in pile. Men bol beams, repair heater core in mezzanine, fab comporrams for mud pump rod
coaling system, ran conduit for LED lights, clean, prime and paint around my housekeeping.
Gas Readings
Avg Background Gas (%)
Max Background Gas 1%)
Avg Connection Gas 1%)
Max Connection Gas I%1
Avg Drill Gas (%)
Max Drill Gas I%1
Avg Trip Gas (%)
Mex Trip Gas (%7
Dayly Mud Vo umes
TWOUAdiitioraltws
Type
Des Veume(bbg
Tank
gclive Pns
Rule
ole
Los
Loss
Formation
Cumulative Mud Volumes
Active Volume (bbl) Hole Volume (bbl) Atltlitl(hot) Cum Addhume and) Losses (bbl) Cum Losses (bog
0.0ons
0.0 0.0 0.0 00 1,094.9
Daily Contacts
Position
Contact Name
Company
Title
Email
Office
Mobile
Eni repreeentalrva
Davin Bmdh
Eni
Oriliing Supv.
Ent repreaenieive
Wade Thames
Eni
RigCie.
AK RgClerksDoyonlSWenipelroleum.
907A05-0722
eon
Eat representative
Pat Ahem
Ent
HSE
Well Name: SP05-FN7 OR
Wellbore Name: SP05-FN7
Well Code: 26944
Job: WORKOVER
WCER Level:
Daily Report
Date: IlMS12018
Report #: 17
Page: 2 of 2
Daily Contacts
Position
Contact Name
Company
Title
I Email
I Office
I Mobile
En! mpmssamome
Rem Too,
Enl
HSE
Tool Push
Chad Johnson
Doyon
Drilling
Tool Pusher
ng15®doymtlnl0n g.com
90741850716
Tad Push
Ted Kmger
Dppn
@illing
Tour Pusher
rigl5�doynntlnlling.mm
90]6850]16
Tool Push
Humid Richardson
Doyon
Drilling
HSE
hrkhardson®doynMrilling com
685-0796
Tool Push
Dave So.
DDyon
Coiling
HSE
dsemigtloyondrilling.com
685-0]95
Personnel Log (POB)
Company
Sem. Type
Work H Mr)
Stind-by H(hr)
Count
Note
Doyon
Field Superintendent
12.50
0
DdOng
Uma Red
Pumping
12.50
0
on me
ASRC
Company Man
1250
1
Dulling
ASRC
Cledr
12.50
1
Dulling
ASRC
SOA
12.SD
1
SID Suppod
ASRC
Crane Advisor
12.0
1
SID Suppod
Beacon
Medic
12.50
1
SID Suppod
Norham Diftild Services
Fueler
12.50
1
SIDS.Ppon
ACS
Em immental
12.50
2
SID Supped
Beacon
HSE
12.50
2
SID Support
Doyon
Tool pushem
12.50
2
Dulling
Doyon
HSE
12.0
2
Dog ng
Ml Swam
Mud Plant
12.0
2
Drilling
ASRC
Logistic
12.0
d
SID Support
Ml Swam
WIF
12.50
4
SID Suppod
Purcell
Security
12.50
5
SID Suppod
ESS
Catering
12.50
9
SID Suppod
Jacobs
Tmck union l Crone oW.W
12.0
10
Drilling
Doyon
Rig personnel
12.50
22
Dnlling_Tolal Drilling Personnel 40
BOP Stack & Components
Malcontbn
Slant Date
Last CerNticetion Date Pressure Rating (psi)
Type Make Model
ID Nom lin/ I
PMan, (,.I) "sl Lem Dah
Slow Circulation Rates
Pump Number: Make:
Mouc:
Start Date End out.
Liner Samjin)
Volume Per Stroke Disunion lbblls0.) Max Pressure lost)
Data DepN (flKB)
Slow Sptl
Stokes(so.)
P(pat)
ENI%) OFlowtgpm)
Daily Bulk
Supply Item Description: Equipment Fual
Unk Label:
Gal
Unit Size: 1
Note:
Date Commumd Received
Rimmed
Cum Consumed
Cum Receivetl
Cum Returned Cum On Lm
Note
11/1512010 14110 1411.0
21.063.0
21,053.0
0.0
0.0
Supply Item Consumption: Mud Plain goiters
UnKlabel:
Gal
Unit Size:
Note:
Doh Consumed Receivetl
Remrnetl Lum Consumetl
Cam Receivetl
Co. Rammed Cum On Loc
Note
11(1512010 42.0 420
672 a
6]2.0
o 0
D0
Supply Item Oescdption: Rig Fuel
UnIt "bel:
gal us
Umt Slee: 1
Note:
Dab LO" sumetl Recehed
Returned
Cum Consumed
tum Receivetl
Cum ReturnedCum Oa Loc
Nqe
11(152018 2.3840 0.0
29,1fi80
d3,10.0
0.0
13,9620
Supply Item Dncdduan: Rig Water
Unstudied:
bbl
Unit Size: t
Note:
Cate Consumetl Receivetl
Retumed
Cum Consumetl
Cum Received
Gum Remrnetl Co. On Loc
Note
11,152018 5)D 135.0
717.0
973.0
00
256.0
SUpplyltem Doic:pfi , WIF Boilers
Unit "pill:
Gel
Unit Size:
Note:
Date Consumetl Received
Remrnetl
Lum Consumetl
Cum Receivetl
Cum Returned Gum On Loc
Note
1111512010 1911.0 198.0
3.168.0
3.160.0
0.0
0.0
Supply Ihm OescmOn- WIF Injectetl Diesel
Unit "bel:
Gal
Unit Size:
Note:
Dale Consumed Received
Remrnetl
Lum Consumed
Cum Receivetl
Cum Returned Cum On lou
Note
11,152010 420.0 620.0
8,0900
6.00 .0
0.0
00
Last Authority Visit
Dam Tot Ins, Nbr
Total I.N.C. number Comment
11132018
BOP Test. AOGCC Jeff Jonas waived witness to BOP lest, nem test due 1111012018
STOP Cards Submitted
Com"
9 Minh
Com
Doyon Onlling
3
PJSM'S
Doyon Drilling Inc.
3
COW
Daycn Drilling lm.
3
HRWS
Doyen DNling Inc
12
Seta Cards
Ml Swam
4
MRCIJSA
MI Swam
4
MR.
General Notes
comment:
Well Name:N7 OR
Wellbore Name: e: SPSPOS-FNFN7
Well Code: 26944
Job: WORK
en i WCER Leve OVER
Daily Report
Date: 11116/2018
Report #: 18
Page: 1 of 2
l Header
N Ccncession N°
KA
Operates Subsidle ry
Initlal Laine Gotle
ENI PETROLEUM ENI Petroleum On Inc
DEVELOPMENT WELL
ry Table Elevatlon (RI Wahr-a-(RI First Flange(K) RKB. Base Flange(K)
RKB - Tubing Stang (In
0.00
s
16.9) 36.65
31.74
Me ame
15
Contractor es Rig Type Rig Num Rig Rebase Data
OOYON
ly Information
LAND RIG 0)23 1�y25201Dah
or
Te perahre('F) Wind Days LID(days)
Days RI ltlays) POB
ety ncidents-Hear Miss
pDall
NE @ 26 MPH 354.00
]54.00 70.0
Category
Type Subtype Severey
Cause Losttimei
ent
ty Drills
Visit
Type
#Occur Last Date
Days Until Next Check
Most Date (days)
Fast o
1 111312018
11/102018
.8
aite Topping Onll
6 11/142018
11202018
12
own pill
3 11/32018
1111V2010
q
Rig Impaction
1 112/2018
1912019
78
So" Meths g
18 111162018
1111)12018
1
Spot nll
18 11/1612018
1111)/2018
I
TT ROPE Odll
3 111122018
11282018
10
TT H28 Call
1 11/152D10
112912018
13
TT Rick While
3 11/1012018
2/82019
84
ripn9
MTripping
TT Kick While Tri
1 11/6/2018
1192018
-9
TT Man Owen Dan
2 11/112018
1111&2018
q
TT Rig Evacuation pill
3 11/1112018
11/122018
q
TT drill
2 11/62018
2/62019
82
Well 10
Tr wen Kul Drill
2 11/1018
32
V1112019
87
Casings seat
1 11m2018
pJ512019
81
Co.. Type
CONDUCTOR
—un,
I lint
IGrade
Top IhKB)
Bdtesn (RKB/
TVD 8p1. INKS)
Run Oeste
CASING 1339
160.0
12.42 L-80 -0.1
166.1 1/12011
CARING 9518
3,909.0
884 L-80
2452.5 1&182012
LINER 512
01 11,989.0
3,995.0 1MM012
LINER
495 L-80 11,7)10 20,675.0
3,901.0 1/1]2013
3112
Last Cementing
20,616.6 "gn-
06730
3,9014 592014
ome
omerdhe Stan Date: W12016 Stang: LINER, 20,6)3.OflKB Comment 3.5" X 5,5" liner hanger/ packer set udide 5.5" liner. TO finer W 20.618, bbl cast 2
Sip TopRKB) Top Maas Meth Bbn IRKS)
of shoe a 673'.
1 20. 18.0
Com
20,873. BLB Teat knee to 35 psi. SLB pump 25 b N 10.5# ----b, 25 bhh 15.0a cement drop 5" wqw ball, 15 bb s
0.5# MutlPush antl dg displace w/ 1114 bah slick
kweler. Sling into
liner packer end saueaa- coined ad 43 able of slick
ater. CIP @ 1010 M1rs.
Job Information
Job PhasePhnnM Sh18rt18:Gala Shrt Doh
WORKOVER End Data
10/302000
P50 Duration (days)
10130201018:0
0.00
Daily Summary Operations
24h Foment
Cmnru8 with well operations suspended wood, on SLB
casing mach normals and personnel.
24h Summary
Continue with well operations suspended, waning on SLB casing patch material and p sam nek SIMOPS dg maintenance.
Operation at 117.00
Continue will, well o,umb a suspended, wailing on SLB casing patch materials and personnel. SIMOPS dg maintenance.
Time Log
Short End Cum our
Time Time Our (w) (d) Phan
0%. qct %an OPer. Descr.
00:00 90:00 24.00 000 W. .
M Can nue wei on BLB mahtiah en Dareoone r casing palM1, SIM
wg p rming maintenance nspechance
lassitude suction nnkaga, ,reit, l mil, Main MI beams. repair heater care
in mezaadne. fab comPoneds fes mW pump had
cooling M aim, inn conduit M LED light, dean. Poona and Print amund nig,
housekeeping.
Gas Readings
Avg Background Gan I%)
Max owunwa um Gas (%) qvg Connectbn Gaa (X)
Max Connection Gu 1%)
Avg Drill Gas (%)
Max Drill Gas (Ya) Av, Ttlp Gas (%)
Max Trip Gas (%)
Daily Mud Volumes
TanWgddb.....
type Des
Tank
AclPils
Volume gdQ
Hole
Ile
Loss
FonmaVon
Cumu/alive Mud Volumes
Active Volume i—,Hole Volume (bap
0.0
Additions (bbl. Cum Atldtions (bbl) Lasses (bbl)
Cum Losses (ba p
0.0
Daily Contacts
09 00 119
1994.9
Position
Contact Name
Company
Too
Emoll
OW..
Ent rapresenhttve
David Smdh
Eni
Dann, Supv.
Mobile
Eni monitorial
Wade Thomas
Ent
Rig Clerk
AKRigCIrbDDyonl 5@wupetroleum.
907-685-0722
Enl represenhlive
Pat Ahem
End
HSE
Nm
Ent representative
Rene red,
Ed
HSE
Tool Push
Chad Johnson
Doyon Doling
Tool Pusher
-g15@2doyoadd1ling cam
907-685-0716
Tod Push
Ted Kroger
Doyon Dans,
Tour Pusher
rW5@doyandgirg com
907-6050718
Tool Push
Rood Richardson
Doyon Dolling
HSE
M1dchadson®doyonardlice.com
685-0796
Tool Peak
Dave Sena
Doyon Entire
HSE
dean@tluyOnduINing.mm
6850786
Well Name: SP05-FN7 OR
Wellbore Name: SP05-FN7
Well Code: 26944
Job: WORKOVER
WCER Level:
Daily Report
Date: 11116/2018
Report #: 18
Page: 2 of 2
Personnel Log (POB)
Company
5mv. Type
Work H lint)
Stand-by Hna)
Count
Nota
Doyon
Field Superintendent
12.50
0
Drilling
Life Red
Pumping
12.50
0
Ddllleg
ASRC
Company Man
12.50
1
Driving
ASRC
Clerk
12.50
1
Drilling
ASRC
SOA
12.50
1
SIDSuppotl
ASRC
Crane Advisor
12.50
1
SID Support
Beacon
Media
12.50
1
SID Support
Northern OIBeYd S.M.
Fueler
12.50
1
SID Support
ACS
Eaviamental
12.50
2
SID Support
Beacon
HSE
12.50
2
SIDSuppotl
Doyon
Tool pushers
12.50
2
Oriting
Doyon
HSE
1250
2
Drilling
MI Swam
Mud PWM
12.50
2
Drilling
ASRC
Logistic
12.50
4
SIDSuppou
Ml Swam
WIF
12.50
4
SID Support
Purcell
Security
1250
5
SID Support
ESS
Calming
12.50
9
SID Support
Jamba
Truck timer l Crane operator
12.50
10
Drilling
Doyon
Rig Personnel
12.50
22
Drilling TOWI Drilling Personnel 40
BOP Stack 8 Components
Descrlmon
$ran Date
Last C.Niffh ation Data Pressure Rating (psi)
Type
Make
Model
ID Nom (int
P Range loci) Vat Cert Date
Slow Circulation Rates
Pump Number: Make:
Motlel:
Start Dale End Data
Liner$1. lin)
Volume Per Stroke Ovemitle@bl/.ik) Max Pressure(psq
Dale Dep[M1 FK -B)
Slow Sptl
Strokes loom)
P(psi)
I Ea tX) OFlow (gPm)
Daily Bulk
Supply Item Description: Equipment Fuel
Unit Label:
Gal
Unit pa: 1
NOW
Date Consumed Received
Ratunretl
Cu. Consumed
Cum Received
Cum Returned Cum On Loc Note
iln1 01B 1,4]12.0 14]60
22,529.0
22529.0
0.0
0.0
Supply Ilam Description: Mud Plant Boilers
Unit Label:
Gel
Unit Sze:
Note:
Date Consumetl Received
Re[ome4
Cum Consumetl
Cum Receivetl
Cum Four Cum On Loc Note
11118/2018 42.0 420
]140
]14.0
0.0
0.0
Su Nem Dmaiption: Rig Fuel
Unit Label:
gal us
Unit Size: 1
Note:
Cate Consumed Receivetl
Returned
Cum Consumed
Cum Received
Cum Returned on Cn Loc
11/iB201B 2.113.0 0.0
31,2810
43.1300
00
11,8490
Jerre
Supply Nem Deacription: Rig Water
Unit Label:
bbl
Unit Size:1
Note:
Data Consumed lRecoveol
Returned
Cu. Consumed
Cu. Receivetl
Cum Returned Cum On Loc Nofe
11/102018 35.0 100
752.0
I 973.0
0.0
221.0
Supply /tion Description: WIF Bolters
Unit Label:
Gal
Unit Size:
No.
Dare Consumed R...I-
ReWrnetl
Cum Consumed
Cum Received
Cum Returned Cum On Lee Note
1111.018 198.0 1950
33Wo
3,366.0
00
0.0
Supply lMn Description: WIF lin sled
Diesel
Unit Label:
Gal
Unit Size:
Note:
pop"Consumetl
Receivetl
Returned
Co. Consumed
Co. Received
Co. Returned Cum On Loc Note
11/162018 420.0
420.0
6.510.0
6,510.0
00
On
Last Authority Visit
Date Tot map. Nbr
Total I.N.O. number Cone ent
m
11132010
BOP Test. AOGCC Jeff Jones waived Moves to
BOP lest, noxi lest
due 111IW2018
STOP Cards Submitted
Company
#Rpm
Cpm
Doyon Urge,
3
PJSMS
Doyon Drilling Inc.
0
Safe Cams
Doyon Drilling Inc.
3
COW
Dayan Dulling Inc.
3
HRWS
Ml Swam
4
HARCIJSA
Ml Swam
4
RIR.
General Notes
Comment.
Well Name:S-FN7 OR
Wellbore Name: e: SPOS-FNFN7
Well Code: 26944
r�'e Job: WORKOVER
e !III WCER Level:
Daily Report
Date: 11117/2018
Report #: 19
Page: 1 of 2
Well Header
PeImiNConcessum N°peramr Subsidiary Initial Lanka Cade
ALASKA ENIPETROLEUM ENI paint Co. tam. DEVELOPMENT WELL
Rdary, Table Etavagon(k) Weter Depth(k) First Flange (k) RKB.Base Flange(k) RK B' Tubing Spool(k)
n"
5362 0.00 16.97 3665 31
I
Rigs
18g Name Cotrbador Rig Type Rig Num Rig Start Data Rig Halt Date
RIG 15 DOYON LAND RIG 0729 12/2512011
Daily Information
weather Temperatum FF) Wind Days LTI(days) Days Rl bli POB
Cloudy 140 NE @ 11 MPH 355.00 355.00 71.0
Safety Incidents - Near Miss
Data category Type Subtype Severity Cause Lost tlme)
Comment
Safety Drills
Days Until Next Check
Type
#Occur
Last Date
Next Date
(days)
Authanly Visit
1
11/312018
1111012018
-7
Fire Dail
6
11/14/2018
11282018
11
Kick While Tripping Ung
3
11/52018
11/122018
-5
Man Down Drill
1
1122018
431/2019
75
Rig lnspechon
19
111172018
11/1&2018
1
Safety Meeting
19
111172018
11/152018
1
Sind Doll
4
111172010
12/12010
14
TT ROPE Dill
1
1111512018
112&2018
12
TT Hi Drill
3
111102010
VW2019
83
TT Kick While drilling
1
11/fi12018
110/2010
-10
TT Kick While Tripping
2
11/11/2018
11/122018
-5
TT Man Down Dog
3
11/112018
11/122018
-5
Tr Rig Evacuation Drill
2
11/82018
2/6/2019
81
TT Stopping doll
211/132016
2A 112019
86
TT Well Kill Still
1
11112016
2152019
60
Casings seat
Cas.Type
OD (in)
to (in)
Grade
TOpRK8)
Bottom (HIM
I TVD But(ftKB)
Run Data
CONDUCTOR
160.0
160.0
1112011
CASING
13318
12.42
LA0
1
3,90902,452S
lNl M012
CASING
95/8
8.04
L40
0.1
11,989.0
3,9950
12202012
LINER
512
4.95
L-80
11,771.0
20,875.0
3,901.0
1/172013
LINER
312
20,618.8
20.873.0
3,9014
5132014
Las"Cementing
Cementing Start Date: 502014 Sting: LINER. 20,6M.01<8 Comment 3.5"X55"liner hanger/ packer set Inside 55"liner. TO liner@ 20,618', him of float shine@206]3'.
Sip# I Top(ftKB)
Top Mese Meth
B.(11KB)
I Cam
1 20,6150
20,073 0
SLB Test Iinss to 3500 psi. SLB pump 25 bbls 1051t MudPush, 25 took 15.0# cement, drop 6' wiper ball. 15 table
10.5# Mudicsh and tig displace, w/ 184 table slick water. Sting into liner packer and consent cement wl 43 bots of slick
I
water, CIP @ 1010 tars.
Job Information
Job Phase Planned Start Date Start Date End Date Pyo Duration flays)
WORKOVER 101301201618:00 10130201818:00 0.00
Daily Summary Openttions
24h Forecast
Continue with welt opemtbns suspended wading on SLS o sllg patch materials and personnel.
24h Summary
Continue with well managers suspended wading on SLB casing patch matenes and personnel.
Operation at 07.00
Continue with well operations suspended. wailing on SLB casing patch matrres and personnel, SIMOPS rig maintenance.
Time Log
Start
End
Co. Dur
Time
Time
DurbrI I
(lin
I Phase
I Opr. I
Ant
I Plan
Opac Dialect.
00:00
00:00
2,;
e
P
Conran, waiting on SLB materials and personnel far acing path. SIMOPB RIg pe tmilg maitdenry ce Inspection on
1 1
iW
Its 1,,
mud pits suction groups, gating M pit, chain fall beams, repair heater core in ma crunlne, feta components tar mud prop lots
I
coding system, on conduit for LED light, dean, prime and ptt around ift housekeeping.
Gas Readings
Avg Background Gas (%) Max Background Gas (%)
Avg Connection Gas (%)
Max Connection Gas (%1
Avg Drill Gas 1%) Max thrill Gas (XI
et, Trip Gas (%)
Max Trip Gas (%)
Daily Mud Volumes
TanMAdtlkionlLoss
Type
Des
VolumeRind)
Tank
[five Its
Hole
Hole
Loss
Formation
Cumulative Mud Volumes
Active Volume (tad) Hale Volume (bbp Additions (tad) Cum Additions (bbl) Losses (bop tum Lasses (tato)
0.0 0.0 oe 00 50 1094.9
Daily Contacts
Position
Contact Name
Company
Tithe
Emall
Office
Mobile
Eni repmsentr ive
David! Smith
Eni
Drilling Supe.
Eni representative
Mike Grubb
EM
Mill, Supv.
sidddlling@enipetmtumcom
907-685-0715
Eni representarrve
Wade Thomas
Ent
Rig Clerk
AKRIVCIer1uDoyonl 51ffeethemistim.
com
907-685-0722
Eni apres.intake
Pat Mem
EM
HSE
Eni representative
Rene Too,
Ed
HSE
Tool Push
Chad Johnson
Doyon Dnllhg
Tool Pusher
dg15@doyonddlling con,
907-606-0716
Tool Push
Ted Keder
Doyon Spur,
Tour Pusher
iigl5@doyund6lling.com
907-6050716
Tool Push
Ham1d protection
Doyon Dnlgig
HSE
hdchaNson@doyandditing.com
605-07%
Well Name: SP05-FN7 OR
Wellbore Name: SP05-FN7
Well Code: 26944
Job: WORKOVER
WCER Level:
Daily Report
Date: 11/17/2018
Report #: 19
Page: 2 of 2
Daily Contacts
Position Contact Name Company
Title
Email
Office
Mobile
Tool Push 1 Dave Serie
I Doyon Oohing
HSE
1 tlaena®dpyon.reng com
685-0]96
Personnel Log (POB)
Company
Sew. Type
Work H(hr)
Stand-by H(m0
Count
Note
Doyon
Field Superintendent
12.50
0
Drilling
Lane Rod
Pumping
12.50
0
Drilling
ASRC
Compmry Man
12.50
1
Drilling
ASRC
Clark
12.50
1
Selling
ASRC
SOA
12.50
1
SID Supped
ASRC
Crane Admor
12.50
1
SID Support
Beacon
Medic
12.50
1
$IO Support
Numsern Called $a,,.
Feeler
12.50
1
SID Support
ACS
Envimmental
12.50
2
SID Support
aeecdn
HSE
1250
2
SID Support
Doyon
Tool pushers
1250
2
Drilling
Doyon
HSE
1250
2
DriAing
MI Swam
Mud Plant
12.50
2
Sinning
ASRC
Logistic
12.50
4
SID Support
All Swam
WIF
1250
4
SID Support
Purcell
Security
12.50
5
SID Support
Jacobs
Tmcktldver/Claneoperator
1250
10
Drilling
ESS
Cabinet
1250
10
SID Support
Doyon
Rig perennial
12.50
22
citing Total Dulling Personnel 40
BOP Stack & Components
Description
Start Data
Last Certification Data Pressure Raring 1pah
Type Make
Model
1
ID Nom In)
P Range (psi) "at Cert Date
Slow Circulation Rates
Pump Number: Make:
Motlel:
$ran Date Entl Oats
Liner $ize (in)
Volume Per Stroke Overfills, Ur! Ikl Max Pressure Ipso
Date Daptt lffNa)
Slow Sptl
farmers (start
P(ptl)
ERI•/I 0Flow (go.)
Daily Bulk
Supply Item Description: Cyuipment Fuel
Unit Label: Gel
Unit SizeI
Note:
out. Consumetl Received
Returnetl Cum Consumed
Cum Received
Lum Returnetl
Cum On Lac Note
11/17/2018 1,5450 1,545.0
24,0]4.0
24,0]4.0
Oo
0.0
Supply Item ailer
unam"on: Mud Plant Bs
Unit Label:
Gal
Unit Size:
Note:
Oato Consumed Receivetl
RaMrned
Co. Consumetl
Cum Received!
Cum Returned
Cum On Lee Note
11/1120/8 42.0 420
156.0
756.0
0.0
0.0
Supply IMn Description: Rig Fuel
Unit Labet
gal us
Unit 6ize: 1
Nate:
Oats Conaumad Receivetl
R¢lur.ad
Cum Consumed
Lvm Receiv¢d
Cum fl¢Wrnetl
Cum On LOG NOM
11/1]/2018 1,941.0 0.0
33,222.0
43,t30o
0.0
9,908.0
supply Rem Oeuripram Rig Water
Unit"bM:
bbl
Untt Size:1
..to
OaM Consumed Received
Returned
Cum Consumed
Cum Rueetved
Cum Returned
Dum On Led Nola
11/172018 26.0 0.0
]78.0
9]3.0
0.0
195.0
Supply learn Description: WIF Boaeo
Unit Label:
Gal
Unit and
Note:
Date Consumetl ReceNed
Reternetl
Cum Cgruumetl
Cum Receivetl
Cum Raturoad
Cum On Loc NOM
11/1]12018 198.0 198.0
3,S64A
3,5640
0.0
DO
supply team Description: WIF Injected
Diesel
Unit Label:
Gal
Unit Size:
Need:
Data Consumetl
Receivetl
Returned Cum Consumed
Cum Received
Cum Returned
Cum On La[ Note
11/172018 4200
420.0
69300
6,930.0
0.0
0.0
Last AUVIOnty Visit
Date T. load. Nor
Total I.N.C. number Comment
1113/2018 1 1
BOP Test, AOGCC Jeff Jones weNrid wXneas M BOP test, rico tut
due 11/102018
S0P Cards Submitted
company
a Rpts
Com
De,on Drilling
5
PJSM'S
Doyon Drilling Inc.
15
Safe Cards
Doyon Drilling Inc.
4
COW
Doyon DMGng Inc.
4
HRWS
Ml Swaco
4
HARL/JSA
Ml Swaco
4
RIR's
General Notes
Comment
�._ Well Name:N7 OR
Wellbore Name: e: SPSPOS-FNFN7
TIM
Well Code: 26944
Job: WORKOVER
ani WCER Level:
Daily Report
Date: 11/18/2018
Report k: 20
Page: 1 of 2
Well Header
PermibConcession N'
Operator Bubsla I,fial Lehee Code
AIASKA
ENIPETROLEUM ENI Pebaleum Co. Inc. DEVELOPMENT WELL
Rotary Table Elevation ad Water Deplb(N) 1.1 F..age DO RKB- Base".age I-) RKB - Tubing Spool(.)
53.62 0.00 16.7 36.65 31.74
Rigs
Rig Name Contractor Rig Type Rig Num
=Date Dab RIg Release Data
RIG 15 DOYON LAND RIG 0723 1225201]
I
Daily Information
Weather Temperature (-F) Wind Days LTI (days) Days Rl (days) POB
Clan', 12.2 NE@23 MPH 358.00 358.00 72.0
Safety Incidents - Near Miss
Data Category Type Subtype Severity Cause Lust lime?
Comment
Safety Drills
Days Until Next Check
Type
60ccur
Last Date
Next Data
(days)
Authority Visit
1 11/312018
11/1012018
6
Fire 0411
6 11II
V2018
1112812010
10
Kick While Tripping Dill
3 11IW2018
1111212018
d
Man Down 0611
1 1122018
1/31/2019
74
Rig Inspection
20 111182018
111192018
1
Safety Meeting
20 111182010
11/192018
1
Spill Drill
4 111172018
1211/2018
13
TT BOPS Doll
1 11/15/2018
I VM2018
11
TT Dive ter Drill
1 111182018
5/172019
180
TT H2S Drill
3 1111012018
M2019
82
TT Kick While drilling
i 111612018
11mmill
-11
TT Kick While Tribal
2 11I11MIS
1111&2018
6
TT Man Down Drill
3 111112018
I
llIV2018
6
TT Rig Evacuation Nil
2 11/02010
2/62019
6o
TT Stripping dill
2 11/132018
21112019
85
TT Well Kill Ord
1 11112018
2152019
79
Casings seat
Cas. Type
OO (in)
ID (in)
Grade
TrP(NKB)
Bottom(ftl
I TVD But. III
I Run Date
CONDUCTOR
1 0
160.0
1/1/2011
CASING
13318
12.42
L-80
-0.1
3.9080
2,452.5
1VIM012
CASING
8518
0.84
L-80
0.1
11.988.0
3.995.0
IMM012
LINER
512
4.95
L-80
11,7710
20,675.0
3,901.0
11172O13
LINER
312
20,616.6
20.6
3,901.4
61312014
Last Cementing
Cementing Start Date: W1214 Smleg: LINER. 20.673.OI00 Comment 3.5'X55"liner hanger/ packer selm,,ide 5. S"Inner. TO liner@ 20,610'. Lim offload shoe@20.673'.
spit Top(ftKB)
Top Meas Meth Ban(11KII) Com
1 Soul
20,73.0 SLB Test linea to State psi. SLB pump 25 table 10 At MudPush, 25 blue 15 88 cement, drop 5' wiper ball, 15 bbla
10.59 MudPusb and dg displace cal 1Be table slick water. Sting into drier packer and squeeze cement w143 bull of stick
i
water. CIP @ 1010 hes.
Job Information
Job Pbese Planned Start Date StartDaer End Data P50 Nation talks)
WORKOVER 10/30201818:00 10130201818:00 0.00
Daily ummary Operations
24h Forecast
Continue with well operations suspended wailing on SLB casing patch ormal is and personnel.
24h $ummary
Continue with well operations suspended wading on SLB using patch materials and personnel,
Operation at 7.06
Continua with well operations suspended, waiting on SLB dosing patch materials and personnel SIMOPS dg mak Meeance.
Time Log
$tartim
cum our
Time
Time
puribl
Ihn
'base
Opt.
Act
Plan
0", Dead.
00011
12-00
12.00
um
W O.
M
z i
P
Cor thru s waiting on SLB mabials and personnel for casing patch. SIMOPS Rig performing maintenance & inspection an
1 i
mud Fila suction linkage, grating in pita, chain bit beams, repair heater core in merzahxle, lab components for mud pump red
cooling system, rem conduit for LED lights, Mean, prime and paint around rig, housekeeping.
Gas Readings
Avg Background Gas (%)
Max Background Gaa (%)
Avg Connection Gas (°6)
Max Connecter Gas (%)
Avg Drill Gas I%)
Max Drill Gas (%)
Avg Trip Gas (%I
Max Trip Gas (%)
Daily Mud Volumes
TanMMtlkignlLoss
Type Des
Volume(bbl)
Tankgc8ve
Pita ,
Hob
Hole
Lose
Formation
Cumulative Mud Volumes
Active Volume (bbl)Hole Volueew(b ll Cam Cum Additions( bbl) Losses (bat Cum Losses than
Ad
0.0 00 00 00 0) 1,094.9
Daily Contacts
Panama.
Contact Name
Comwry
Thin
Email
O1Bce
Mobil
Ent rep®senbiNe
Dil Smith
Em
Drilling Supv.
Em represenbtiva
Mike Grubb
Em
Drilling Sam,
siddilling@enipereleurtcom
90irki 15
EM representative
Wade rllomas
Ent
Rig Clerk
AKRIgClerksDWmll5@MmpetmIeum.
earn
97685-0722
Ent representative
Pat Ahem
Ent
HSE
Ent representative
Rena rates
Ent
HSE
Tool Push
Chad John.
boyish Drilling
Taal%aber
igt5@doyondi1iA,com
90]685-0718
Tool Push
Ted Kroger
Dayan Drilling
Tour Pusher
ng15@doyondidin,com
676850716
Well Name: SP05-FN7 OR
Wellbore Name: SP05-FN7
Well Code: 26944
Job: WORKOVER
WCER Level:
Daily Report
Date: 11/1812018
Report #: 20
Page: 2 of 2
Daily Contacts
Praline" Contact Name
Company
Tito
Emall
Office Mobile
Tool Push amltl RICnaNaon
Doyon Dolling
HSE
mcnamsonrgooyonartlling com
685-0]96
Tad Push Dave Sena
Doyon DNlinp
HSE
nsenastaoyandogingcom
805-0)95
Personnel Log (POB)
CompanyServ.
Type
Work H go)
Stand-by H(m)
Count
Note
Doyon
Field Supermfe deM
12.50
0
Drilling
Uleo Red
Pumping
12.50
0
Ddllllp
ASRC
Company Man
12.50
1
Ddtfng
ASRC
Gad
12.50
1
Dulling
ASRC
SOA
12.50
1
SID Support
ASRC
Crane Advisor
12.50
1
SID Support
Sadden
Medic
12.50
1
SID Support
Northam Oilfeils Servkoa
Fusser
12.50
1
SID Support
Vatco Grey
Wellhead Service
12.50
1
Dolling
ACS
Envlromental
12.50
2
SID Suppari
Beacon
HSE12.50
2
SIDSupport
Doyon
Tool puaners
12.50
2
Dulling
Doyon
HSE
12.50
2
Drilling
MI Sam.
Must Plant
12.50
2
Drilling
ASRC
Logistic
12.50
4
SID Support
Ml Swaco
WIF
12W
4
SID Support
Pumall
Security
12.50
5
SID Support
Jacobs
Truck dnver I Crane operator
12.50
10
Drilling
ESS
Claim,
12.50
10
SID Support
Doyon
Rig Personnel
1250
22
DnllMg Tata( Drilling Personnel 41
BOP Stack B Components
Description
Shit Data
Last Certification
Data Pressure Rating Pid)
Type Meke Model
ID Nam(in)
PRange (psi) Last Cert Data
Slow Circulation Rates
Pump Number: Make:
Modek
Start Doh End Date
Liner Size (in)
Volume Per Spoke Overrtde(bbllsik) Mae Pressure(psi)
Date
Depth(Rids)
Slow Spd
strokes (lip.)
P (pai) I
Eff 1%)
0 Flow g,m)
Daily Bulk
Supply Item Description: Equipment Fuel
Unit Label: Gal
Unit St.:i
Note:
Date Consumed Recelvetl
Returned Cum Co.sumetl
Cum RecdVed
Cum Rehrnetl
Cum On Loc
Note
11/102018 1.318.0 1.318.0
25.3920
253920
0.0
0.0
Supply Bern Description: MW Plant SdMrs
Unelabel:
Gd
Unit Size:
Note:
Data Consumed Reacelved
Returned
Lum Donsumetl
Cum ReceWild
Cum Returned
Co. On Loc
Nota
1111812018 42.0 420
T90.0
]98.0
00
00
SuppL Nem Descdptlan: Rig Fuot
UMI Label:
gat as
Umt Size: t
Note:
Date Consumetl Received
Rehrnetl
Cum Consumed
Gum Received
Cum Returned
Cum On Loc
Note
1 V1&2018 1.]280 2536.0
34,945.0
45,6680
0.0
10.]210
Supply Item DeaeNpOon: Rlg Watar
Unit Label:
bbl
Unit Size:1
Noh:
Doh Consumetl Recelvetl
Rehrnetl
Com Consumetl
Cum Received
Cum Rehrnetl
Cum On Loc
Nate
111182018 35.0 00
813.0
9]3.0
D.0
160.0
Supply Item Deaadptlon: WIFSailers
Unit Label:
Cal
Unit 5ize:
ride:
Data Consumed
Recatvad
Returnee
Cum Cansume0
Cum Recelvetl
Cum Returned
Cum Cn Lac
Note
11/182018 198.0
1980
3,]62.0
3,]62.0
0.0
0.0
Supply Item Description: WIF lnjeded
Least
Unit Label:
Gori
Unit Size:
Noh:
Data Consumed ReceivesReturnetl
Cum Consumed
Cum Recelvetl
Co. Returnee
Gum On Lee
Note
1111812018 4200 4200
7.350.0
],3500
0.0
0.0
Last Authority Visit
Data Tot ins, Nbr Total I.N.D. number Commen[
Ila 2018
BOP Test, AOGCC Jeff Jones waivetl witness to BOP tact, next test tluu i
11102010
STOP cams Submitted
Company
pRds
I
Com
Doyon Dolling
8
M'
Doyon Onlling 1.
15
h
El. ," s
Doyon Drilling Inc
T
COW
Duran Digging Inc.
T
HRWS
Ml Swaco
4
HARC1JSA
Ml Swaco
4
RIR's
General Notes
Comment:
Well Name: SP05-FN7 OR
IA Wellbore Name: SP05-FN7
Well Code: 26944
a' Job: WORKOVER
en �1i II II WCER Level:
Daily Report
Date: 11/19/2018
Report 11: 21
Page: 1 of 2
Well Header
PenolVConcession N -Operator
Sutra Glary Initial LaM1ea CoOe
ALASKA ENIPETROLEUM
ENI Palmlaum Co.lna DEVELOPMEM WELL
Rotary Table Elevation(.) Wan DopM(h)
he Flange (it) RKB - Base Flange(ft) RKB- Tubing Shod(1ry
5362 0.00
16.9] 136,65 31,74
Rigs
Rig Name Corporate,
Poe Type me Num Rig Start Date Rig Release Date
RIG 15 DOYCN
IANO RIG 0723 12/252017
Daily Information
Weather Temperature(°F)
Wind Day c LTifdays) pays RI (days) POB
Cloudy 15.8
NE @ 26 MPH 357.00 35200 71.0
Sarety Incidents - Hear Miss
Date category Type
Subtype Severity cause Lost time?
comment
Safety Drills
Days Until Next Cheek
Type
a Occur
Last Date
Next Data
(day:)
Auh.rAy Visit
1
1182018
11/16/2018
-9
Fite Dnli
6
11/142018
11282018
9
Kick While Tripping Drill
3
1115/2010
111122018
-7
Man Down NO
1
1122018
1/312019
73
Rig Inspection
21
11/192018
11202018
1
Safety Meeting
21
11/192018
11202018
1
Stall NO
4
11/1712018
lVla018
2
Ti ROPE Gil
1
111152018
112912018
10
TT 0lverler Drill
t
1111gn018
511712019
179
TT H2S D411
311/102018
2182019
81
TT Kick While tldning
1
11/612018
1122018
-12
TT Kick While Tripping
2
11111/2018
11/12/2018
-7
TT Man Down Drill
3
11/112018
11/12/2018
4
TT Rig Evacuation Gp1
2
1182018
2162019
79
TT Shipping dull
2
11/132018
2/112019
84
TT Well Kill NO
1
11n12018
&S12o19
7a
Casings seat
Cas. Type OD lin)
IO (iit)
Grade
Top (hKB)
Bottom(h(BI
I TVD Bot felts
Run Dnh
CONDUCTOR
ifiOA
160.0
1 1
CASING 13318
12.42
L-80
-0.t
3,809.0
2,452.5
012
12/1921
CASING 958
8.84
L-00
0.1
11,999.0
3,995.11
12802012
LINER 512
4.95
L -e0
11,%71.0
20.675.0
3,901.0
1/172013
LINER 312
206166
20,873.0
3,901.4
582014
Last Cementing
Cementln8 SMk Data: 5/)2014 String: LINER, 20,673. KB
Comment: 3.5" X5.5 her hanger/ packer set ins 5.5" liner. TO finer @ 20.618', Mm of float shoe 8 20.673'.
Stgh Teti I Top Meas Mem
Bbn (h— Co.
1 20.6'60
20,673.0 SLB Tact lines to 3500 poi. SL Dump 25 this 1058 MudPush. 25 bbl. 1S. cement, drop 5' wiper ball, 15 bible
10.511 MudP sh and rig dialyses wl 184 bbls slisk water. Sling Into Inner packer and squeeze cement wl 43 this of slick
water. COP @ 1010 his
Job Information
Job Phase PIen11tl Start OaG
start Dme End Data1750 Duration (days)
WORKOVER 1W30201a 18:00
IWWM01018:00 0.00
Daily Summary Operations
24h Forecast
Continue wdh well operations suspended waiting on SLB using patch materials and personnel
24h Summary
Continue with well operation suspended wading an SLB casing patch materials and personnel.
operation at 07.00
Continue with welt Operations anatomist, waning on SLB casing path materials and personnel. SIMOPS ng maintenance.
Time Log
—
End
rtumour
Time
Time
our (hit
(tel
PMse
Opr.
Act
Plan
Clear. Descr.
00:00
00:00
24.00
24.00
W.O.
M
23
P
i omtnue wain, on SLB materials and personnel for casing patch, SIMOPS Rig performing maintenance & Inspection On
had p8s suction linkage, grefing in lull, chain fall teams. repair heater core in mezxanito fab componenh for raw pump rad
1
waling system, run conduit fm LED Iighbi, dean, prime and pamf around rig, housekeeping.
Passport reel SPAT.
Gas Readings
Avg Backgrountl Gas (%)
Max Background Gas I%) Avg Connection Gas (%1
Max Connection Gas I%)
Avg 0.11 Ga.1%)
Max Orill Gas I%)
Avg Trip u (%)
Max Trip Gas (%l
Daily mua Volumes
TarapAtldtious Lose
Type
Dee
Vulumeabl)
Tank
ACINe Pits
Hole
Hole
Loss
Formation
Cumulative Mud Volumes
Active Volume (bbl) Hole Volume Hate Additions (bbl) Cum Additions (bb0 Losses (b it Cum Looses (Had)
0.0 0.0 0.0
10.0 00 1.094.9
Daily Contacts
Position
Contac<Name
Company
napery
This
Email
office Mobile
Eni reDresantetive
Davitl Smith
-
tinning Sup,.
Eni representative
Mike Guth
Ent
OMling Supv
wildrifingittempetobum core
907-685-0715
Eni representative
Wed. ThomasEnt
Rig Clerk
AKRigCkroDoyonl 5@en,xAmleum.
907-685-0722
corn
End representable
Pal Mo.
Ent
HSE
End representative
Read TOupa
Eni
HSE
Tool Push
Chad Johnson10royon
Dolan Drifng
Tool Pusher
ngl5@dayondK1ng.wm
807fi 716
Tool Fush
Teti Kroger
Drilling
Tour Pusher
rigl5@tdoyondn1ling.com
907-6850716
Well Name: SP05-FN7 OR
Wellbore Name: SP05-FN7
Well Code: 26944
Job: WORKOVER
WCER Level:
Daily Report
Date: 11/1912018
Report #: 21
Page: 2 of 2
Daily Contacts
Position contact Name
Company
Title
Email
C10ce
Mobile
Torii Push Hamid mcharoan
Doyon
uhning
HSE
ancbartlson®doyondnsing.com
605-0796
Tool Push Dave Sen.
Dayan
Onl9ng
USE
dsena@doyontlrilling mm
6850796
Personnel Log (POB)
Company
S." Type
Work H(hn
SRnd-by IN (ha)
Count
Note
Doyon
Field Superintendent
12.50
0
only,
Little Red
Pumping
1250
0
Drilling
ASRC
Company Man
12.50
1
Dolling
ASRC
CRIk
12.50
1
Dolling
ASRC
SOA
12.50
1
SID Support
ASRC
Crane AMisw
12.50
1
SIDSupporl
Beano
Medic
12.50
1
SIDSuppon
hashish Olffeidd Selvims
Faular
12.50
1
SID Support
Vel. Gray
Wellhead Service
12.50
1
Dliding
ACS
Emsennental
12.50
2
SID Suppot
Beacon
HSE
12.50
2
SID Supped
Doyon
Tool pushers
12.50
2
Coding
Dayan
HSE
12.50
2
Dolling
MI Swaco
Mud Plant
12.50
2
Drilling
ASRO
Logistic
12.50
4
SID Suppon
Ml Swam
WIF
12.50
4
SID Support
Purcoll
Security
12.0
5
SIDSuppan
Jacobs
Truck driver I Crone abandon
12.50
9
Drilling
ESS
Gating
12.50
10
SID Support
Doyon
Rig personnel 1
12.50
22
Drilling_Total Drilling Personnel 0
BOP Stack 8 Components
Description
Start Data Last Certification Data pressure Rating (poi)
Type Make
Model
10 N. (I.)
I
Plunge(,,) Leat Con Date
Slow Circulation Rates
Pump Number Make:
Madill:
SRrt Data I End 0010
Liner Sia (in)
Volume Per Stroke Cyanide Dollstk) Mo. Pressure Ipso
Data Depth(fill
I Slow Sptl
Shokes(spm)
Is (al
I Effl%) gFlaw (gpm)
Daily Bulk
Supply IRM Description: Equipment Fuel
UnNlabel:
Gal
Unit Site:1
Note:
Data consumed Receivetl
C
Retorted
Lum Consumetl
Cum Received
Cum Remrnetl Cum On Loc
Net.
11/19.2U16 C ip3L0
28,823.0
26,8230
00 0.0
Supply Itun OascripHm: Mud Ram Bogies
UMt Label:
Gal
Unit Size:
Note:
DataConsumetl lRanceived
Returned
Co. Consumetl
Cu. Racal
Cam potentialCum On Loc
Note
1111912010 420 42.0
840.0
"0D0
0.0 Co
Supply team Description: Rig Fuel
Unit Label:
gal us
Unit Site: I
Note:
pateConsumetl Receivetl
Returned
Cum Consumetl
Cu. Recelvs l
Cum Returrretl Lum Cn Lec
Note
11/19/2018 1.9670 0.0
3eS2.0
45,666.0
00 8,754.0
Supply lRm Distillation: Rewriter
Unittebel:
bbl
Unit Size:1
Note:
Date Consented Receivetl
R.Wmed
Clean Consumed
um Receivetl
CUM Returned Cum Cn Loc
Note
11/192018 390 135.0
052.0
1,108.0
0.0 2560
Supply Item Description: WIF Bolan
Unit Label:
001
Unit Size:
Note:
Date Consumed
Receivetl
Remrnetl
Cum Consumetl
Cum Received
cum Remrnetl Co. On Loc
Note
11/182010 198.0
198.0
3,960.0
3,9600
00 00
Supply item pescriplace WIF lmjeclad
O'nael
Unit Label:
Gal
Unit Size:
Note:
Cam Conaumnd Receivetl
RNurintl Lum Consumed
Cum Receivetl
CUM Returned Cu. On Loc
Note
11/192018 420.0 4200
7770.0
7,770.0
00 0.0
Last Autbonty Visit
Oat. Tot loop. Nbr Total I.N.C. number Comment
IUM018 I
SOP Test, AOGCC Jeff Jones antived witness R BOP test, next Rat due
11/102018
STOP Cards Submlfted
Company
R Rats
Com
Doyon Dulling
3
PJSM'S
Casco Drilling Inc.
16
Safe Cards
Cayce Drilling Inc.
3
COW
Doyan Dulling Inc.
3
HRWS
MI Swam
4
HARC/JSA
Ml Swam
4
RIR's
General All
Comment:
Well Name:S-FN7 OR
Wellbore Name: e: SPOS-FNFN7
Well Code: 26944
e'e Job: WORKOVER
2911 WCERLevel:
Daily Report
Date: 11/2012018
Report #: 22
Page: 1 of 2
Well Header
Parmil/Concession N°GII¢rdWr
66510 qIIIItldI Lah¢e CN
ALASKA
ENI PETROLEUM ENt Petroleum Co. Inc. DEVELOPMENTWELL
Rotary Table biennia. (it) reads, Depth (a) First-onge(tt) RKB-Base Flange tet) KKB - Lown, pomj.)
5362 0.00 16.9] 3665 31.]4
I
Rigs
Rig Name Co menta, R19 Type Rig Num Rig Stale Data Rig Release Daft
RIG 15 DOYON IANC RIG 0723 12/25201]
Daily Information
WeatM1er Temperature ( -F) Wind pays 'T1 (days) Days Rl tdays) POB
Cloutly 176 N®17 MPH }58.00 35800 72.0
Safety Incidents - Near Miss
Data category Type Subtype severity Cause Lost dme]
Comment
Safety Drills
Days Until Nexl Check
Type aoccur
Last Date
Next Data
(days)
Autborky Viisfl 1
it1312om
11/102018
-10
Fire Drill 6
1111412010
11282018
8
Kick While Tripping Drill 3
111WM18
111102010
-8
Man Down Mill 1
1UMMS
1131IM19
72
Rig Inspection 22
111202018
1121/2018
1
Safety Meedp 22
111202018
11212018
1
Spill Dill 4
1111]2018
1012018
11
TT ROPE Drill 1
11/1&2018
11292018
9
TT Dienoter Drill 1
11/1812018
5/172018
170
TT H2S Drill 3
11/102018
0812019
80
TT Kck While dnlling 1
11/62018
11/]/2010
A3
TT Nick Whita Tripping 2
11/112018
11/102018
-8
TT Man Down Drill 3
11/112018
11/122018
E
TT Rig Evacuation ONI 2
111812018
252019
78
TT Stripping dnll 2
111102018
0112019
83
TT Well Kill Drill 1,119/2018
0512019
77
Casings seat
Cas. Type
OD (in)
ID (in)
Grade
Top (RKBI
Bottom IRKS)
TVD Bot IRKS)
Run Data
CONDUCTOR
160.0
1600
1112011
CASING
133/8
1242
L-80
-0.1
3,9080
2.462.5
10192012
CASING
9510
8.84
L-80
0.1
11,9890
3,995.0
10!02012
LINER
512
4.95
480
11,]]1.0
20,6750
3,901.0
1/92013
LINER
312
20,616.6
20,61`3.0
3,901.4
522014
Last Cementing
OemenOng Start Date: 592014 Sorg: LINER, 20.6]3.OXKB Comment: 3 6" %5.5" !mal hanged packer at inside 5.5" hoer. TO liner @ 20.618', biro of float shoe g 20,6]}.
Sts, d Top (MMM
Top Meas Meth
Bbn (MB)
I Com
1 20.618.0
20,6]3.0
BLB Tesl lines to 3500 per. SLB pump 25 nee 10Sit MudPuah 25 bible 15.80 cement, drop 5" wiper ball, 16 bible
10. Ma MUdPush and dg displace col 104 bbls agree water. Sting into liner Packer and squeeze cement w/ 43 bible of slick
water. CIP @ 1010 his.
Job Information
Jab Phase Planned SSM Date Star[ Data End ate P50 Mhudon (days)
WORKOVER 10130201818:00 10130201018:00 0.00
Daily Summary Operations
246 Forecast
HOPE Testing, Resume operations on SP05.
Mrs.,
Continue with well operatns suspended enables, on SLB casing path materials and personnel.
Passport Teskd SP1 0.
Operation at 07.00
Prep For BOPS Test
Time Log
Start
End
Cum Dur
Time
Time
our Ur)
@n
Phase
Opr.
Act
Plan
Oper-0eea.
0000
00:00
24,00
24,00
W.v
es 23
P
waiting on SLB materials and personnel for casing push, SIMOPS Rig performing maintenance & inspection on
1
1
1whanue
mud pita auction linkage, gmtk9 in the, chain fall beams, repair heater core in mkmmntne, fab cumponenls for mud pump rod
cooling system, ron conduit for LED lights, case , prime and paint mount rig, housela epip. Passport Test SP10
Gas Readings
Avg Background Gas l%)
Max Background Gas l%)
Avg Connection Gas (%)
Max Connection Gaa(%)
Avg Drill Gas l%)
Max trill Gas l%)
Avg Trip Gas l%1
Max THP Gas(%)
Daily Mud Volumes
Tank/Additionfloss
Type
Des
Volume alb!)Tank
Active Pils
Hole
Hole
Loss
Formation
Cumulative Mud Volumes
Arbor Volume lbbb Hole Volume(bbl) ad Inner Cum Additions Jobb Losses bbl) Cu;; Losses (still
0.0 ao oD o.g oD 1,09a9
Daily Contacts
Position
Contact Name
Company
Title
Small
I Dake
I Mobile
Ent representative
David Smith
Eni
Drilling Supv.
Ent representative
Mike Gmbh
Eni
Drilling Supv.
stddrilhngitempatroleum.mm
907485-0715
Eni representative
Wada Thomas
Eni
Rig Clerk
AKRIgC1mIdDoypn15®empe1aleum.
com
907485-0722
Eni representative
Pat AM1em
Enl
HSE
Ent representative
Meek Hubler
Ent
HSE
Tool Push
Chad Johnson
Doyen Name
Tool Posher
rig15@doyondMhng.com
907405-0716
Tool Push
Ted Kroger
Doyon DriRng
Tour Pusher
rgl 5@Eopndn1hngcen
90]-6850]16
Well Name: SP05-FN7 OR
Wellbore Name: SP05-FN7
Well Code: 26944
Job: WORKOVER
WCER Level:
Daily Report
Date: 11/20/2018
Report #: 22
Page: 2 of 2
Daily Contacts
Position
Contact Name
Company
Tilde
Email
Omce
What,
Tool Push
Hamid RlChama00
Doyon
Drilling
HSE
bticbesntongdoyonorillmg.com
6BSU]96
Tool Push
Dave Serle
Doyen
Drilling
HSE
oint tloyontldlling..m
6850796
Personnel Log (POB)
Company
Sent. Type
Work H(M)
Stual-by H(hr)
Count
Note
Obyon
R N Superintendent
12.50
0
During
Lithe Red
Pumping
12.50
0
Coiling
ASRC
Company Man
12.50
1
Drilling
ASRC
Clerk
12.60
1
Drilling
ASRC
SOA
12.50
1
SIO Support
ASRC
Crane Advisor
12.50
1
SID Support
Beacon
Medic
12.50
1
SID Support
NorMem OthegE Service.
Fueler
12.0
1
SID Support
Vel. Gray
Wellhead Service
12.50
1
Daring
ACS
Envlromental
12.50
2
SID Support
Been
HSE
12.0
2
SIDSupport
Doyon
Tool pushers
12.0
2
Drilling
Ooy.
HSE
12.0
2
Drilling
MI Sworn
Mud Plan
1250
2
Drilling
ASRC
Logbtic
12.0
4
SID Sopron!
MI any.
WIF
12.50
4
SID Support
Purcell
Security
1250
6
SIDSupppd
Jamb.
Truck driver I Cana operator
12.0
9
Drilling
ESS
Crating
12.0
10
SIO Support
Doyon
Rig Personnel
12.50
22
Drilling Total Drilling Personnel 40
BOP Stack 8 Components
Description
Start Dae Last Castigation Das Pressure Rating (pap
Type Make Model
ID Nam (in) I
P Range (pi Last Cart Date
Slow Circulation Rates
Pump Number: Make:
Model:
Start Date End Dale
Liner St. lint
Volume Per Stroke Override lbbllslk) Max Pressure(psil
Date Deptb (pKBt
Blow Sptl
enhance (.port
P(pat)
EHI%I
OFlow (g m)
Daily Bulk
Supplyltem Description: EquipmendFuel
Unit Label: Gal
Unitsice:1
Note:
Das Conaumetl
Received
Rammed Cum Consumed
Lum Received
Cum Returned CUM On Loc
Note
1120.2010 1,055.0
1.055.0
2],8]8.0
2],Wea
0.0 0.0
Supply ism Descripeom Mud Rant
Boilers
Unit Label:
Gal
unit Size:
Note:
Date Consumetl Received
Rehire
Lum Consumetl
cum Received
Cum Returned cum On Loc
Nate
1112012018 42 ago
8820
882.0
0.0 6.0
SUR" lam DeacripBon: Rig Fuel
Uat Later
gal us
Unit Size:1
Note:
Das Consumed Recelvetl
Returned Cum Consumed
Cum Received
Cum Returned Cum On Loc
Nos
112012018 2009.0 566].0
38,.1.0
51.333.0
0.0 12412.0
Supply ism DescHption: Rig Water
Ust Label:
bs
Unit Size:1
Note:
Dere Consumetl Received
Returned
Cum Consumetl
Cum Received
Cum Resrned Cum On Loc
Nos
1120/2018 610 00
9130
1,108.0
0.0 195.0
Supply Item Description: WIF Boilers
Unit Label:
Gal
unit Sire:
Note:
Dari Consumed ReceNetl
Remrnetl
Cum Cpnaumetl
Cum Received
Cum Returned Cum Qn Lac
Note
112012010 1980 198.0
4,158.0
4,151
00 0.0
Supply Rem Dentcriptiom WIF Injected Dental
Unk tabes:
Gal
Unit Size:
Note:
Date Consumed Received
Returned
Cu. Cunsumetl
Cum Received
Cum Returned Cum On Loc
Note
11120/2018 840.0 0400
8,610.0
8,610.0
00 0.0
Last Autbonly Visit
Dale Tot inap Nbr
Tool I.N.C. number Comment
1113/2018
BOP Teal. AOGCC Jeff Jonas waived witnea t to BOP lest, hand Not due 11/12018
STOP Caids Nubmittedy
Cop"
apple
Corn
Doyon Dolling
8
PJSMS
Doyon Drilling Inc.
20
Safe Cams
Doyon Drilling Inc.
4
COW
Doyon Drilling Inc.
4
HRWS
MI Swaco
4
RIR.
Ml Swaco
4
HARCIJSA
Geoneryll Notes
Comment:
Well Name:5-FN7 OR
Wellbore Name: e: SPOS-FNFN7
Well Code: 26944
' Job: WORKOVER
cent WCERLevel:
Daily Report
Date: 11121/2018
Report fl: 23
Page: 1 of 2
Well Header
Pam d/clumession N°
0, after
$ubtdlary Initial Lahee Code
A"M
ENI PETROLEUM ENI Pelroteum Co. Inc DEVELOPMENT WELL
"M, Table Elevation lft)Water
De Par fro
First Flange(ft) RK. - .ase ..age (of RKB-Tubing Spool (it)
53.62
leaned
16.97 36.65 31.74
Rigs
Rig Name
CmM1eeterRig
Type RI. Num Rg start DowRig Release Dale
RIG 15
ODYON
LAND RIG 0]23 12/25201]
Daily information
Weather
Temperature(°F) Wind Days LTI(day.) Days RI(days) POB
Clouit
8.6
NEQ 29 MPH 359.00 358.00 760
afary Incidents - Near
miss
Date
Category Type Subtype Savorily Cause Lost time?
Comment
Safety Dfills
Days Unt Next Check
Type
#Ducar
Last Date
Net Oat.
(days)
Authorily Dail
1 1122018
111IW2018
-11
Fire Dol
6 11/14/2018
112812010
7
Klok While Tripping Dol
3 IIIW018
11/1212018
-9
Man Down Ono
1 11
wKH8
11312019
71
Rig Inspedion
23 112112018
11222010
1
Safety Meraft
23 1121/2010
11222018
1
Spill Drill
4 11/172018
12/112016
10
TT ROPE Drill
1 11/152018
1112912010
8
TT Diverse Oil
1 11/1&2018
5/1712019
177
TT 112S Drill
3 111102018
2/82019
79
TT Nick While dnlfing
1 111412018
1102018
-14
TT Nick While Tripping
2 111112018
11/12/2018
-9
IT Man Down Drill
3 11/112010
11/122018
-9
TT Rig Evacuation Drill
2 11MO18
21612019
A
TT Stripping drill
211/132018
W1112019
82
TT Well Kin Drill
111UMO1a
2R/2019
76
Casings seat
Cas. Type
Do (in)
to (in)
Grade
Too III
I Sodom INKB)
I TVD Sol Roper
I Run Date
CONDUCTOR160.0
16loo
1/12011
CASING
13 W8
12.42
480
-0.1
3.909.0
2,452.5
1&192012
CASING
9518
8.84
L-80
0.1
11,9890
3.995.0
1213012012
LINER
512
4.95
L-80
117]1.0
20,6750
3,9010
1/1]2013
LINER
312
20.6166
20,673.0
3,9014
51312014
Last Cementing
Centered, Start oto: 6.2014
SMng: LINER, 20,V3.O
Comment: 3.5" X5.5 liner hanger/ packer set inside 5 5" Ilner. TO liner ® 20.618', biro of float shoe Q 20,6]3'.
af9# Top (Mile
TOP Meas MeM
Man(fel
Com
1 20.610.0
2,0]3.0
SLB Test lines to 3500 p;, Ste pump 25 boo 10.5# MudPush, 25 bbls 15.80 cement, drop 5"Most ball. 15lobo
10.50 MudPush and rig displace w/ IBe rims trick water. Sting Into liner packer and squeeze cement w/ 43 bots of slick
I
water. CIP @ 1010 ors.
Job Information
Job Phase
Planned Start Date
Start Data Erb DatePW Duration (days)
WORKOVER
immol818:00
1013020101000 DDo
Daily Summary Operations
24n Forecast
Run lam packer in hale b 11700
and se, Pull out of hole and lay down mnning tool. Pick up Baker entriwamalk and inn in hole to 236W and lest from 2350' to 11,]00' t 1500 psi for 30 minutes. Pull oW of hole
with packer and rig up and start Sahel casing patch operations.
24h Summary
Clean and painting rig wells. Test
BOP whh 4.5' and F test joints. 250(3500 psi. 5 minutes with test witness by Bran Bixby of AOGCC. Bullhead 65 bbN down kill string. Pull tubing hanger and pull Mt string out of
hole. Install wear dog. pick up and
make up Tam Packer add inn in hole TI38'.
Operation at 07.00
RIH elPacker Away ®11,65(Y
Time Log
sur[ End cum our
Time Time our Orr)
inn) Phase Opo. I Act. Plan Opur Descr.
00:00 03-0 3.00
3.00 W.O. M 23
P Continue to clean and paint walls in Wheel well. Mezzanme and hydraulic unit
0300 03:30 050
3.50 W.O. M 23
P Pressures poor to pumping 0=120 psi. A-0 psi. TBG=O psi.
Bullhead 50 Mils of 9.6 ppg brine w1 usan down A annulus at 31,pm, 157psi,
0330 0990 5.50
9.00 W.O. M 23
P Continue to clean and paint in Wheel well, Mezzanine and hydraulic ung.
09-0 1600 ].00
16.00 W.O. C 12
P Test BOP who 4.5'and 5' teal pints. 2SWING psi, 5 minutes with test address by Been Bigby of AOGCC. Ted instead,
upper and lower VSR pipe rems. Chase manifold valves 145. primary and secondary kill demur waves, primary add
secondary choke HCR s. FOSV, dart vieve. test hydraulic shake and manual choke, Not gas alarms, PVT system and alders,
test Mem paddle and alarm Padorm Kqumey draw down testlniml=ACC-3000. Amr=1330. Man -145, after ACG2150, Anm
1400.200 psi -20 sec, full psi in 60 depends. N2 bottles ave=9000 psi.
1600 16:30 0.50
16.50 W.O. C 12
P PJSM, mg; dower test equipment and blow down dl surface lines. Pull tedjelm and landing ping. make up landing joint and
head pin.
1630 17:00 0.50
1700 WO. M 9
P .all head 65 M down kill dMrg.1126 gpm 950 psi."0 psi. BoisM psi.
1790 18:00 1.00
18.00 W.O. M 1
P Bleed. Annulus A care 24 psi to bleed tank. charter annulus A for 3D minutes, no pressure build.
lam 20:00 2.00
2000.W.O. M 5
P Pull landing joint, all BW and makeup landing meal 9ULDS and pull tubli, jumped ng floor UW=f90k Po Wil hanger.
1111=901, Lay down landing joint not change Nevatiou to 5-
2000 2200 2.00
22.00 W.O. M 4
P Pull kill string out of hole from 2 1 ' MIMS hole with 41bbls every 5 Mande,
2200 22:30 0.50
22.50 W.O. M 5
P PickuptioHmatandset.corg.ID=9'. Laydown neer dog mnning tort,
22:30 00:00 1.
24.00 W. M 4
P PJSM, Pick up and make up Tam packer antl ran to holo W 28'.
Pumped 150 bola of 9 6 ppg brine Ne bast 24 Muds.
Gas Readings
Avg Background Gas j%)
Max Background Gas (%1
Avg Equation.. Gas I%)
Max Connection Gas(%)
Avg Drill Ga. I%)
Mex Mill Gas f%1
Avg Top Gas (9.)
Max Trip Gas H A)
Well Name: SP05-FN7 OR
Wellbore Name: SP05-FN7
Well Code: 26944
Job: WORKOVER
WCER Level:
Daily Report
Date: 11/21/2018
Report #: 23
Page: 2 of 2
Daily Mud Volumes
Tank/AdtlgbmlLos.
Type
Des
Volume (bbl)
Tank
Active
Pits
Hole
Hole
Lass
Formation
Cumulative Mud Volumes
Active Volume(bbl) Hole Volume A6ditidns(bbb
0.0 09 0.0
eum Adtlitions(bbU Lenses
0.0 0.0
(bbl' Cum Losses lhbB
1,0949
Daily Contacts
Position
Contact Name
Company
TIO,
Email
Otgee
Mobile
Eni representative
Bruce Simonson
Eni
Billing Sup¢
uddnllimg@emipetmleum.com
907685-015
Eni representative
Mn. Grubb
EM
DMI'ng Supv
undriflir,ttim,ebolsun cdm
907485-0715
Eni reprea.hWW.
Wade Thomas
Eni
Rig Cleh
AKRIgC!mhs0oyon l 5@enieetmisum.
907685-0722
com
Eni representative
David Leonard
Eni
HSE
Eni representative
Mark Hubler
Ent
WE
Tool Push
Justin Hama
DOydn
Dolling
Tool Pusher
dgl5ttide,dndnllilg.com
Tool Push
Ted Kruger
Doyon
Drilling
Tour Pusher
rgl 5(thtlopmInlling corn
9076850716
Tool Push
Hamad Richardson
Doyon
Drilling
HSE
hnchamson@doynndrilling.com
885-0796
Tool Push
Scott Simmons
Doyon
Drilling
HSE
Personnel Log (POB)
Company
$a". TyPe
WOO H @n
Stand-by H (hr)
Count
Note
Ooyon
Field Superintendent
12.50
0
DUIOog
Urge Rod
Pumping
12.50
0
Drilling
ASRC
Company Man
12.50
1
Dulling
ASRC
CbO
12.50
1
Drilling
AMC
SOA
12.50
1
SID Support
AMC
Omm Advisor
12.50
1
SID Support
Baswn
Medic
12.50
1
SID Support
Northern Oiffelld Selvloss
Fueler
12.50
1
SID Support
Vince Gray
Wellhead Service
12.50
1
Ought
TAM
Packets
12.50
1
Drying
ACS
Envkomental
12.50
2
SID Support
Beacon
HSE
12.50
2
SID Suppon
Doyon
Tool pushers
12.50
2
Dolling
Doyon
HSE
12.50
2
Drilling
MI SAA'.
Mud Plant
12.50
2
Coffin,
ASRC
Legible
12.60
4
SID Support
Ml Swaco
WIF
12.50
4
SIDSuppou
Purcell
Security
12.50
5
SID Support
Schlumberger
Wireline
12.50
5
Drilling
Jncpbs
Truckddver/Crurniierato
12.50
10
O1p,
ESS
Catering
12.50
10
SID Support
Doyon
Rig Personnel
12.50
22
Or1IIn,_TotaI Drilling Personnel 49
BOP Stack 8 Components
Oescripbm
Start Dam Last Carpeted.. Data Pressure Rating (psi)
Type Make Model
ID Nam (in)
P Range (psi)
Last Cert Data
Slow Circulation Rates
Pump Number: Make:
MOtlel:
Shirt Due End Oat.
Liner Son (In)
Volume Per streke Override (bbVslp Mas Pressure lobi)
Data I Depth (MOB)
Shear Sind
Snake. ppm)
P(,at)
0Ft. (gpm)
Daily Bulk
Supply Item Description: Equipment Fud
Unit Label: Gal
Unit Size: 1
Note:
Cab Co a"' Received
Returned Cum Consumetl
Cum Receivetl
Cum Returned Cum On Loc
Note
112112018 1068.0 1,468.0
29,396.0
29,346.1
0.) 00
Suppty lMn 0....ip0on: Mud Plerd Boilers
Unit Label: Gal
Unit Size:
Note:
Date Consumed Receivetl
Returned Cu. Consumer!
Cum Received
Cum ReWrnetl Cum On lac
Note
11212018 42 0 42.0
92d 0
924.0
00 0.0
SWPlylbm DOSCKPlion: pal
Unit Lobel:
gains
Unitsloo I
Noe:
Gale Consumed Recelvetl
Reusmed
Cum Consumetl
Cum Receivetl
Cum Returned Cum On Loc
Note
112112018 1,9580 00
40,879.0
51.333.0
0.0 10.454.0
Suppty Item Description: Rig Water
Unit Label:
bbl
Unit St.:I
Note:
Data Consm
uetl RecReturneded
Returned Cum Consumetl
Cum ved
Recei
m W
CuRernetl Cum On Lac
Nota
1121/2010 430 0.0
956.0
11080
0.0 1520
Supplyltam0eaerip0om WI'llas.re
Ubtt Label
Gal
Unit Sou:
Note:
Dab Consumetl Receivetl
Returned
Cum Consumed
Cum Received
Cum Returned Cum On
Note
1121/2018 1980 190.0
4,3560
4,3%.0
Cr 0.0
Supwylbm OeaMptldn: WIF lnjefted Dbael
UNILabel:
Gal
Unit Size:
Note:
Date Consumed Receivetl
Returned
Cum Consumed
Cum Recanted
Co. Returned Cum On Loc
Noe
1121/2018 0.0 00
8,fi10.0
86100
0.0 0.0
Last Authority Visit
Gate Tot ins,. Nor TOM I.N.C. number Comment
111312010
BOP Test AOGCC Jeff Jones ained witness to BOP test, nerd bet due
11/1012018
S70P Cards Submitted
Company
It Rpts
Com
Doyon Detling
4
PJShrS
Odium Drilling Inc.
20
Safe Cams
Doyon Dtlllkg Inc.
7
HRWS
Doyon DnNng Inc.
4
COW
Ml Swaco
4
HARCIJSA
Ml Swaco
4
RIR'.
General Notes
Comment:
Well Name:N7 OR
Wellbore Name: e; SPSPOS-FNFN7
Well Code: 26944
en i WCERLevel
eve OVER
Daily Report
Date: 1 1/2 212 01 8
Report N: 24
Page: 1 of 2
Wellder
ession N° Operator
eubeMlary Initial Lane. Code
ENIPETROLEUM
ENI Pelmleum Co. Inc. DEVELOPMENT WELL
e Elevation (10 Water Depth (ft)
First Flange (ftl RKB Base Flange for RKB- Tubing Spool (it)
0.00
16.97 3665 31.74
Contrapb
RlgTypeRig Num Rig SMrt Data Rig Release DareODYON
IAND R0]231125201]
rmation
Temperature (°F)Wind
Cloudy
WN Y. LTI (says) Days RI (days) me
-7.6
22MPH 350.00 360.00 790
SafetyIncidents - Near miss
Deny Category Type
Subtype Sway Cause Lost time?
Comment
Safety Drills
Type
#occur
Last Dare
Next -Date
Days Until Nezt Cn«x
Wayc)
Au1M1onN Visit
2
11212010
112812018
8
F r Dan
6
11202018
0
Kick While Tripping Dr1Il
3
IV512011/1,U2018
111512010
11111/2/18
-10
Man Down Drill
1 1122018
1/312010
T1
Ri9lnspedpn
24 111222018
11232010
1
SefeN Meeting
24 112212018
11I2M2018
1
Spill Did
4 11/1]2018
1VIIM18
g
TT ROPE DMI
1 11/152018
11292018
)
TT Diversr CUP
1 111182018
5/172019
176
TT H2S Doll
3 11/102018
Z&2019
78
TT Kick While drilling
1 1182018
imnol8
-15
TT Kick While Tapping
2 1111112010
11/122018
-10
TT Man Down Drill
3 11/1112018
111ID2018
-10
TT Rig Evacuation Dr01
2IIAVIN18
282019
76
TT SOippilg doll
2 11113/2018
1/112019
81
TT Well Kill Drip
1 11nY2018
1/512019
]s
Casings seat
Cas. Type
CONDUCT R
00 (in)
ID (in)
Grade
Top (hKB)
I Bottom (ftKB)
TYD Bot (RKB)
Run Delo
CASING
13318
12.42
L-00
-0.1
600
3.9090
160.0
2,4525
111201
121&2012
CASING
95/8
8.84
L-80
0.1
11,909.0
3,995.0
12/3N2012
LINER
512
4.95
L801177110
20.8)5.0
3,901.0
1/172013
LINER
312
20,819.6
20,BTJ.O
3,901A
513.2014
Last Cementing
Cementing start Dare: 5912014 String: LINER, 20 ]3.OnK8
Comment: 3.5" X 5.5" liner hanged packer set imoide 5.5" liner. TO liner ® 20,518', ban of float and. a 20,973.
S[g# Tap (hKe) Top Meas Math
BM (ftl481 Co.
1 20,818.0
20,6]3.0 SLB Test linea m psi. SLB pump 25 blue 10.5# MudPush, 25 blas 15AP cement, drop 5" wiper ball, 1 b Is
10.512 MudPusM1 and o9 displace w/ 184 bbis slick water. Sting into liner packer and sauenz. cement W 43 bible of ski,
ware[ CIP ®1010 hn.
JOD Information
Job Plow.Plannatl Bkrt Dale
Stan Data End Date P50 Duracan d
(sYs)
WORKOVER 1080201818:00
10/30201810:00 o.1D
Daily Summary Operations
24h Forecast
Finish test on 9 Say dasing Fr2280T/11700. Test 9 WIE casing F12260' T/
sulfece. Pull out of (role with rslrievemagc Packer. Prep and ran in hole Saftel liner patch and cw eiak with a -line and Test
casing shop patch from 11,700 to sumacs to 1500 pal for 30 minutes. Run in
set patch
hole with away fBhing and unseat TAM packer and pull out of pole.
24h Summary
Run in hole with TAM packer and set at 11,700. Pup out of We and by down the running tool. Cumulate 90 ppg lane around Make up Baker rablevamatic pecker and his in hole to teat 9 518- opens from 2280'
W 11,]00' at 1500 psi for 30 minutes.
Operation x10).00
Prepare W run Sahel Inver patch in the hole.
Time Log
sort Em
Cu. our
Time Time Our lar)
@n Phase One.
Act
Plan Oper. Dews,
00:00 %;OD ].00
)00 W.O. M
4
p lConfiRsemmn in hole calm TAM single shot IBP p F2B'Tn 1.00. No ratums U, surface, PtA-Mk,S ]ek.
0]00 :30 2.50
ago W.O. M
1
P Drop 1.8 bait antl cirnime down M 2 bpm, cm Wdlesel realms to sudaca at 35 bbie a W kom bag on seat at 2350 seeks
(165 bids). Set plug with 700 psi pressure, hold for 10 morula, over pull 5 k, as, 5 k scrcaae presslue to 1900 pai and
observed pressure drop oh when pins shear Pick up to verify fop release, set down 5 k dawn b confirm Packer was set
0930 1200 250
1200 W.O. M
9
P A0emp1 W Isy do"single, U -tubing from song. Kelly up and wmulate 9,6 ppg brine 205 bible n 35 ban. 140-2psi, MW in
and out 9.6 PMOone.,.11 toe.
1200 1830 6.50
1550 W A M
4
P PJSM. pull out of hole 811699' and lay clown TAM single Shot IBP muning too. Flling h e wsth tlutl pipe lisp acement every
5 stands. Pumped 90 burs. Clean and dear flop[
1830 21 2 512
21.00 W.O M
4
P Make up and ran in hole 9 SIdE Baker Relnevamatic Packer and z-0 can 5' TT525 d e pipe ran in hole TQ.283. Make up Subs.
FOSV and skis an" sub.
21:00 00:00 3.00
24 W V0M
1
P Set Baker 9 thar rahievamatic promise IUSY (canter a eiememl. Sed down 65k. Test from 2,280 011]00'( set depth of
TAM packer). SIa9e pressure up 50 500 ped and held for 2 minutes, atlehnpt LU pr«sure up to 1000 psi and broke over at 950
psi and kat 400 pal in several mhnneslreMms 0 surface). Robed air from drill pipe and stroked pipe up and down. Tat #2 -
Stage pressure up Pressure holding at 500 pal, stage pressure up to 1000 psi and held, attempted W Mage pressure of, k
1$00 psi and broke over at 1350 pal Test # 3, aper bled planar. of we stroked dnll pipe again and applied mom weight an
the pecker. Staged pressure upholding M 500. 1000, and Pressure up to 1600 psi. Pressure hers for 12 minks was 100 psi.
Bletl Pressure o0 antl worked pipe again and started last #4.
Gas Readings
Avg Background Gas I%)
Max Background Gas (%)
Avg C«nedbn Oaa (%) Max Connedbn Gas (%)
Avg 0.11 Das (%)
Mez ONII Gas I%)
Avg Twp was (%1 Maz Trip Gas (%)
Daily Mud Dlumes
TenWAddildmlLose
Tank
Ty"
Das
m
Volume (blit
Active
8.
Hole
Hok
Loss
.z. alioPils
Well Name: SP05-FN7 OR
Wellbore Name: SP05-FN7
Well Code: 26944
Job: WORKOVER
WCER Level:
Daily Report
Date: 1112212018
Report #: 24
Page: 2 of 2
Cumulative Mud Volumes
Active Volume (bbpHol¢ Volume (bbl) 3m... (6611
Cum Additions (hot) Losses
(bbl) Cum Losses (bi
LID 0.0
00
0.0
00
111949
Daily Contacts
Position
Contact Name
Company
TIS.
Email
ORke
Mobile
Eel repmseMetive
Bruce Simonson
Ere
Drilling So,
sicidnlling9@enipetmleum com
907-685-0715
Em representative
Mike Gmbh
End
Drilling Supv.
siddrilldng®enipetroleum.cem
907G85-0715
Em representable
Wade Thomas
End
Rig Clerk
AKRigClerksDoycal 5@entpdromum.
907438541722
.am
End repremplative
Dead Leonard
Eol
HSE
Eni representative
Me* Heider
Eel
HSE
Tool Push
Justin Hays
Doyon
Dmlling
Tool Pusher
rg15@dormp P1I ng com
Tool Push
Ted Kruger
Doyon,
earth,
Tour Pusher
rg15QEoyendnlldng.com
907-6850718
Tool Push
HemM Richardson
Darden
Drilling
HSE
hnchadson@dopednlling.cam
805-07%
Tool Push
Scott Simmons
Doyon
Drilling
HSE
Personnel Log (POB)
Company
Sam. Type
Werk H (hr)
Stand-by H on
Count
Note
Doyon
Field Superintended
12.
0
Drilling
LMm Red
Pumping
12.50
0
Drilling
ASPIC
Company Man
12.50
1
Drilling
ASRC
Clerk
1250
1
Duping
ASRC
SOA
12.50
1
SID Suppod
ASPIC
Crew Adviser
12.50
1
SIDSUPPod
Beacon
Medic
12.50
1
SID Support
Northam Ormiid Services
Fueler
12.50
1
SID Support
Vete. Gray
Wellhead Service
12.50
1
Drilling
TAM
Packers
12.50
1
Drilling
Halleakin
Halliburton
12.50
1
Drilling
ACS
Envimmental
12.50
2
SID Support
Beacon
HSE
1250
2
SID Support
Doyon
Tool pushers
12.50
2
Dulling
Doyon
HSE
12.50
2
Drilling
Ml Swaro
Mud Plant
12.50
2
Drying
ASRC
Logistic
12.50
4
SID Support
All Sworn
WIF
12.50
4
SID Support
Porton
Security
12.50
5
SIDSuppen
Schlumberger
Wireline
12.50
5
Drilling
Jecohs
Truck driver/Crane operator
12.50
10
Drilling
ESS
Catenng
12.50
10
SID Support
Doyon
Rg Personnel
12.50
22
Dnlldng_Tolal Drying Personnel 50
SOP Stack Components
DescnPdden
StaNDate
Last CertOcation DOW Prescure Rating Whop
Type Make Model
I ID Went (In) I
P Range (pal)
Last Cert Date
Slow Circulation Rates
Pump Number: Make:
Model:
Start Date End Dam
Liner St. (in)
Volume Per Stroke Overrule (bbl/auk) Max Pressure (psi)
Date Depth WSKB)
Slow Spd
Strokes (start
P(psi) I
ER(%)
0Flow Spml
Daily Bulk
SUEImm Description: Eguipmed Fuel
Unit Label:
Gal
Unit Size: 1
Note:
Dam Consumetl Received
Returned
Cum Consumed
Lum Receivetl Cum Returned Lum On Loc
Note
11222010 1.J]5.0 13)50
30,]21.0
39]210 0.0
0.0
Supply horn Descnpdon: Mud Plant seism
Unit Label: Gal
Unit Size:
Nora:
Dam Consumed Received
Returned Cum Concumetl
Cum Recelved Cum Returned Cum On Let
Note
1122/2018 42.0 42.0
988.0
988.0 0.0
0.0
Supply Item Descdption: Rig Fuel
Unit Label:
gel us
Unit Size: 1
New
Dam Lonsumetl Recemed
Returned
Cum Consumetl
Cum Received Co. Relurnetl Cum On Loc
Nate
1UMD18 24020 3.9m0
43.281.0
55,271.0 0.0
11.990.0
Supply Hem Description: Rig WaterUnit
Label:
MUnir
size:1
Note:
Date Consumed Receivetl
Returned
Cum Lonsumetl
Cum Receivetl Cum Returned Cum On Lx
Note
it2T/2018 5I0 1350
1,013.0
1,243.0 0.0
2300
Supply Ran Description: WIF Sellers
Unit Latter..
Gal
Unit Size:
Note:
Dam Consumed Received
Rmma
Cum Consumed
Lum Receivetl Cum Returned Cum On Loc
Note
11222018 198.0 i98.0
4,554.0
0.554.0 0.0
0.0
Supply trim Descrlp0on: WIFhteded Diesel
Unit Laopl:
Gal
Unit S.:
Note:
Dam Consumetl Received
Returned
cum Consumed
Lum Recdved Cum Relurnetl Cum On Lee
Nde
11222018 420 0 4200.
I
9,030.0
9,030 0 00
0.0
Last Authority Visit
Dam Tot in., Nor
Trial I.N.C. number Comment
11242/118
BOP Test, AOGCC From grapy witness to SOP test, meal test due 14232018
STOP Cards Submitted
Company
0Rpm
Cam
Doyon Drilling
8
PJSM'S
Dayan Drilling ince
8
HRWS
Dorm Drilling ince
8
COW
Doyen Drilling ince
7
Sam Cards
MI Sao.
4
RIR'.
MI Swam
4
HARC/JSA
General Notes
Comment:
Well NameOR
:
Wellbore Name: e: SP05 SPO5-FNFN7
Well Code: 26944
Job: WORKOVER
eni WCER Level:
Daily Report
Date: 11123/2018
Report #: 25
Page: 1 of 2
Well Header
PermiUCOncess;on N°
Operator Sub6ldlary Initial Laher Coupe
AIASKA
ENI PETROLEUM ENI Petroleum Co. firm. DEVELOPMENT WELL
Rotary Table MevaBon(it, Water Depth (n) First Flange (it RI(B-Base Flange to) RKB-Tubing Sixed(lb
5362 000 1697 311 31.74
I
Rigs
Rig Name Conlmctor Rg Type Rig Num Rig SUtt Dab Rig Release Date
RfG 15 DOVON IAND RIO 0]23 12/25201]
Daily Information
weather Temperature (°F) wind Days LTI(days) Days RI(days) PDB
Cloudy WC -23° -t 1.2 W(g SMPH 36100 3fi100 800
Safety Incidents - Near Miss
Data Code90ry Type Subtype Severity Cause Lost time?
Comment
Safety Drills
Days Until Next check
Type
a occur
Last Date
Next Data
(days)
Amhonty Visit
2
111212018
11282018
5
Fire 0.11
6
11/14/2018
11282018
5
Kok While Tripping Dill
3
111512018
11/122018
-11
Man Down Drib
1
1122010
1512019
69
Rig Inspection
25
11232018
1124/2018
1
Seery Maeklg
25
1123201E
11242018
1
Spilt Drill
4
11/1]2018
1VII2018
8
TT BOPE Drill
1
11/152018
11292018
6
TT Oiveder Out
1
11/182010
W172019
175
TT Ill God
3
11/10/2018
2/02019
77
TT Kok While drilling
1
11512018 1tn2018
-16
TT Kick While Tripping
2
11/112010
11/122018
-11
TT Man Men Oris
3
1111112018
11/122018
-11
TT Rig Evacuation Ono
2
1152010
262019
75
TT stpµn9 dd0
2
11/132018
vllao19
80
TT Well Kill Drill
1
11n2018
2/5ANH9
74
Casings seat
Cas.Type
Do (I.)
ID (in)
Grade
ToUni
Bad. (ftKe)
TVG and. (11108)
Run Date
CONDUCTOR
12.0
160.0
1/120
CASING
13318
1242
1-80
A.i
3,909.11
2.4525
12/192012
CASINO
95/8
8.04
".
01
11,988.0
3,9950
12/3012012
LINER
512
4.95
L-80
11,617710
20,6]50
3,901.0
1/1]2013
LINER
312
20,68
20,613.0
3,901.4
51312014
Last Cementing
Cementing Start Date: Sm2014 SMng: LINER, 20,673DEKB Comment: 3.5" l( 5 5" liner hanger/ packer set inside 5.5" liner. TO liner ® 20,618', bon of float shoe (iy 20.673'.
atg #
Top (hKB)
Top Meas Meth
Ban (RKB)
I Cam
1
20, 160
20.6]3.0
Sl -o, mo lines b 3500 psi. SLB pump 25 bbls 1O N MudPush, 25 balk 15.8k cement, drop S' wiper bell, 15 asks
10Ed Mu lPesh and as displace wl 184 hake stick water Sling Into liner packer and squeeze cement w143 bbls of slick
I
water CIP @ 1010 his.
Job Information
Job Phase Planned Start Date Start Data End Data P50 Duration (days)
WORKOVER 10OROGIS 18 1 10130201810:00 0.00
Daily Summary Operations
24h Forecast
Complete 9 518' caking parch, tun 7.95 trial though patch. Pull out of hole and lay down morning tools. Test using and patch fmm 11.700 to slide.. to 1500 pas for 30 minuses. Room hole wit Baker fishing and
unseal TAM packer and pull out of Mle. Prepare to run completion.
20 Summary
Finish test on 9 518' using F2280 T/11]00'. Test 9 SIB' casing F/2280' Tl surface. Pull mut of hole with mtevamahc packer. Prep and tun in hole Exist liner patch and wer late with ei and set patch anchor.
Siad expansion Schedule to expand patch to using.
Operatlon at 07.00
PN, WU Oveishµ to RI WRetays Packer
Time Lag
Start EM Cum Our
Time Time cur film flo) Phase Do, Act. Plan Open. Descr.
0000 00:30 0.50 050 W.O. M 1 P Continue to test 9518' casing Fl2280T11.700' at light) psi for 30 minules(gmod lest/ no pressure build an annulus 0),
00:30 0230 2.00 250 W . M 1 P Reposition Baker retrievamatic and test 9 518' casing Fr226e' T/Surface at 1500 psi tri 30 minched geod test/ no pressure
build 9n annulus B)
0230 0500 2.50 5 00 W.O. M 1 P Pull auk 9f hale with packer F2260' and bracken mnNig teal. Filling hole with pipe displacement. Clean and clear floor.
0500 06:00 1.00 600 W.O. M 25 P 79. -WP dove and conduct weekly across inspection.
06.00 14:00 8.00 14.00 W 0. M 1 P Makeup parch assembly as per asks and tun in hole T1115'. Fill stand and Assembly with 9.6 pi Anne. Pressure ting to
1000 psi, clicked lest. Pressure gest 0 2500 psi for 5 minutes, goad test Rig due. test erlulpmnot.
1-40077-00 3.00 17,00 W.O. M 4 P Run in hole will patch assembly F1115' T12265' on 5' tlnb pipe Iduhn, ppe wit Da flog hone every sten PU=B BC=85k.
Filling drill µpe every slantl.
1700 2030 T-50 20.50 W.O. M 5 P Rig Up SL8 e -line wlgh Gamma and CCL. Run In hob and carrelale depute. Pull ma of hole end rig down ini Mark pip. with
rrelabd dept.
20:30 3.50 24. Do W.O. M 4 P Pick up amWin pin, antl ee eery sub a nual ham pipe shed. Run in hole From M65' b 2300'. Rig up bases while at Mor
10000 1
level. Put; up and set finer patrol top at MS F Set anchor and Inflate as per Sellel, start pumµng and depth schedule with
ng pump.
Gas Readings
Avg background Gas (%)
Max Background Gas I%)
Avg Connection Gas Pal
Max Connection Gas (%)
Avg Drill Gas (%)
Max Drill Gas (%)
Avg Trip Gas (%)
Max Trip Gas (%)
Daily Mud Volumes
Tank/Addition-ss
Type
Des
Volume(bbp
Tank
Active Pits
Hole
Hole
Loss
Familiar
Well Name: SP05-FN7 OR
Wellbore Name: SP05-FN7
Well Code: 26944
Job: WORKOVER
WCER Level:
Daily Report
Date: 11/2312018
Report #: 25
Page: 2 of 2
Cumulative Mud Volumes
Active Volume par) Hole Volume ibbl) Additions, (bbl)
0.0 0.0 0.0
Cum Atltlilions (bbl) Losses (WI) Cum Lassea (lab!)
0.0 0.0 1,094 9
Daily Contacts
Position
Contact Name
Company
Title
Email
Office
Mobile
Ent rephandauso
emw Simonson
Em
Drilling Sup.
sideriling@enipeooleum.wm
90]-605-0]15
Ent reCrawmatme
Mike GMbb
Em
Drilling Supv.
siddilingittempelmteum.00m
907-685-0715
Eni mpresenides
Wade Thomas
Ent
Rlg Clark
AKRgClerks0oyon15@entpetrdaum.
907485OP82
End represenhlwe
David Leonard
Eni
HSE
tion
Eni reluasenWllve
Mark Hubler
Eni
HSE
Tall Push
Justin Heys
Doyon Dulling
Taal Pusher
rgt5@tloyondnNng.wm
Tad Push
Ted Krupa
Doyon Onlldng
Tour Pusher
rg15@dz zndrilldngtum
907-6850710
Tool Push
Hamid Richardson
Doyon Drilling
HSE
hdchardsoragltloyonerdllog wm
6850796
Tool Push
Scop Simmons
Doyon Drilling
HSE
Personnel Log (PCB)
Company
Serv. Type
Work H(Irn
Shn&py N tor)
Count
Note
Dayan
Feld Superintendent
12.50
0
DnINg
Me Red
Pumping
12.50
0
Dmmng
ASRC
Dennis, Man
12.50
1
Collins
ASPIC
Clerk
12.50
1
Dtllling
ASRC
SOA
1250
1
SID Support
ASPIC
Crane Advisor
12.50
1
SID SUDDod
Beacon
Metl¢
12.50
1
SID Support
NoMem Oilrayd Services
Fueler
12.50
1
SID Support
Voted Oray
Wellhead Service
12.50
1
Digging
TAM
Peckers
12.50
1
Dmllog
Halliburton
Halliburton
12.50
1
Drilling
Beyer
Fishing I Packers
12.50
1
Drilling
ACS
Envdmmental
12.50
2
SID Support
Season
HSE
12.50
2
SID Support
Doyon
Taal pushers
12.50
2
Drilling
Doyon
HSE
1250
2
Drilling
MI Swaw
Mud PWM
12.50
2
Dnlldng
ASRC
Logatto
12.50
4
SID Support
Ml Sworn
WIF
12.50
4
SID Support
Purcell
Secuhb7
12.50
5
SID Support
SchMmbeger
Wireline
12.50
5
Dulling
Jacobs
Tmckddverl Cmneoperator
12.50
10
Drilling
ESS
Catering1250
10
SID Support
Doyon
Rig Personnel
12.50
22
Ddling Total Drilling Personnel 51
BOP Stack 8 Components
Descrlption
Stu[Data Last Cerdfiwtlon Dole Pressure Rating (psi)
Type Meke Model
IO Nom (in) I
P Range (pad)Last Cert Dale
Slow Circulation Rates
Pump Number: Make:
Model:
Skirt Data End Date
1Jner Size (in) Volume Per Stroke Override (bbllsik) Max Pressure (psi)
Data pepih(M(B)
Slow Sptl
Shown, spm) I P(psl)
ER(3d I DPlow Sad)
Daily Bulk
Supply Ilam Des[ripthri Equipment Fed
Une Label:
Gat
Unit Size: 1 Note:
Date Consumed Received
Returnetl
Cum Consumetl
Cum Received Cam Returned Cum On Loc
Note
112312018 1,555.0 1,5550
322]8.0
32.2]6.0 00 0.0
Supply Item Description: Mud Plant Bollen
Uhit Label:
Gal
Unit Size: NOW
Doh Consumetl Recehand
Return,
Cum Consumed
Cum Receind Cum Returned Cum On Loc
Note
112312010 42.0 42.0
1,000.0
1,0080 0.0 0D
Su ly Nem Description: Rig Fuel
UnR Label.
gal as
Unit Size: 1 Note:
Date CDnsumM RweMatl
Returned Cum Consumed
Cum Receivetl Cum Returned Cum On Lo[
Noh
11232018 2261.o 0.0
45,512.0
55.2]10 0.0 9,7290
Supplyltan DaeoriPtlon: IN, Water
Untt Label:
bbl
Unit Size:1 Note:
Date Consumed Reeelvetl
Returned
Cum Consumetl
Cum Rmeivetl Cum Returned Cum On Loc
Note
11232018 39.0 00
10520
12430 0.0 191.0
Supply Ilam DeaeripNon: WIF 9010M
Unit Label:
Gal
Unit site Noh:
Date Consumetl Received
Renamed Cum Consumed
Cum Reeased Lum Returned Lum On Lee
Note
11232018 198.0 1980
4,752.0
4.]52.0 0.0 0.0
SupRtylhm Deseriptlon: WIF Intend
Diesel
Unit Label: Gal
Unit Size: Note:
Doh Consumed
Received
RaNrnetl Cum Consumed
Cum Received Cum Returned Cum On Loc
Nota
112X2010 00
0.0
9,030.0
9,0300 0.0 0.0
Last Authority Visit
Dare Tot map. Mir Total I.N.C. number Comment
11212018 I
BOP Test. AOGCC Brian Ship wilness b BOP lest. next test tlue 11282018
STOP Cards Submitted
Company
N Ron
Com
Doyon Drilling
9
PJSM'S
Doyon Orrin, Ina
6
COW
Doyon Ddlhng Inc.
6
HRWS
Doyon Drilttng lw.
4
Safe Calls
le Swaw
2
HARCUSA
MI Swaw
4
RIR'.
General ffolad,
Comment:
Well Name: SP05-FN7 OR
illlll� Wellbore Name: SP05-FN7
Well Code: 26944
�n e' Job: WORKOVER
e II II WCER Level:
Daily Report
Date: 11124/2018
Report #: 26
Page: 1 of 2
Well eader
PermiVCancession N°
Operator Spieltlbry Initial LaM1ee code
AL45KA
ENI PETROLEUM ENI Petroleum Go. in.. DEVELOPMENT WELL
Rotary Table Ekaton fR) Water Depm (ftl First Flange(ft) RKB-Base Flange(ft1 RKB - Tubing Saudi IS)
5362 000 16.9] 36.65 31 74
Rigs
RIB Name Commuter Rig Type RI9 Num Rig Start Data Rig Release Data
RIG 15 DOVON -AND RIG 0723 12252011
Daily Information
Weamar Temperature (-F) Wind Days LTI(days) Days Rl(days) POB
Cloudy WC J8° .13.0 N ®19 MPH 3620(1 1 362 00 180.0
Safety Incidents - Near Miss
Date Catade, Type Subtype Severity Cause Losttimei
Comment
Safety Drills
Days Until Nexf Check
Type #Occur
Last Data
Next Dam
(day31
Aumorily Visit 2
111212018
11202018
4
Fire Drill 6
11/142018
11/232018
4
Kick While Tpppng 1
11111/2010
111122018
-12
Kick Whlk Tripping Drill 3
11/52018
11112/2018
-12
Man Down Drip 1
1122018
in12019
68
Rig Inspection 26
111242018
11252o18
1
Sell Meaing 26
112412018
112512018
1
Spill Drill 4
11/17/2018
lVI12D1B
7
TT DOPE DMI 1
11/152018
112912018
5
TT Divenar Drill i
11/182018
51172019
174
TT H2S DMI 3
11/102018
2/82019
75
TT Kick While drilling 1
ilAk2018
1102018
-17
TT Kick While Tripping 2
11/1112018
11/12/2018
-12
TT Man Down Drill 3
11111IM10
1111212010
-12
TT Rig Evacuation Call 2
11/82018
M2019
74
TT Stripping drill 2
11/132018
2)11/2019
79
TT Well Kill Drill 1
1102018
2/52019
73
Casings seat
Cas.Type
OD (in)
10 (in)
Grade
Top(NKB(
Bottom fftKBl
7 TVD But.(ftKB)
I Run Data
CONDUCTOR
1600
160.0
1/12011
CASING
13318
12.42
L -BO
-0.1
3,9090
2.452.5
12/192012
CASING
9518
6.84
L-80
0.1
11,9890
3,9950
12/3012012
LINER
512
4.95
L-80
11,7710
20,6]50
3,901.0
11172013
LINER
312
20,616.6
2,673.0
3,901A
502014
Last Cementing
Cementing Stan Date: Si String: LINER, 20,673.OfiKB Comment: 3.5" x 5.5" liner hanger/ packer set inside 5.F liner TO liner Sk 20,618', bpm of float shoe @ 20,673.
big is Tap (RKB/
I Top Meas Meth
Bhn (ttNB) Co.
1 20.618.020.8
SLB Test lines to 3500 psi. SLB pump 25 mils 10.54 MudPosh. 25 Ells 15.8# cement men 5" wiper ball, 15 fills
10.5# MudPush and dg displace el 184 fills slick wales Sting into liner Packer and squeeze cement wl 43 bis of slick
water, CIP Q 1010 hes.
Job Information
Job Phase Planned Sun Dam Start Date End new Pyo Duration (days)
WORKOVER 1013020181 B:00 1013012111810:00 000
Daily Summary Operations
21h Forecast
Finish IaNng down 5- TT525 drill pipe ham dere& out of mouse hole. Prepare to run completion.
24h Summary
Complete 9 518 -casing patch, run 7.95 tool though Patch. Pull out of hok and lay down running tools. Test casing and patch hem 11,700 to surface to 1 S psi for 30 minutes. Run in hole with Baker fishing and
unseal TAM packer and pall out of Mm. Pull wear ring and Install mouse hole N bible. Laying down thrill pipe hem derrick with mouse hole
operation at 117.00
laying down drill pipe from dean& with mouse hob.
Time Log
sun End Co. Dur
Then Time our(&) (hr) Phase Opr. I Act Plan Oper.Deecr.
00:00 61:30 150 150 Wo, M 19 P Fioisb g Sabi 9 SM° ce¢mg pates, pull lad 0.ntry mougM1 patch. Patch top set at 2,284.5' ant bottom at
%Ri down 211E pressure hoses and lay tlown side entry
7 y clow ManimrwNl.
casing
0130 03:3, 2.00 3.50 W.O. q P Pull oto hole
ll am. f P b end layd pa mnnhg end setting lads.
and too.
0330 0530 2.00 5.50 W.O. M 12 P Ig cap tesfing equipment end run a SIB° casing find. al
equipment and red mil m inducing pMd1 et 2281.5'2.284.5' e11500 psi kr 30
inhe s,e niffing off slowly and n
antiisasse B. Bled oftown.and ng down teal equipment.
0530 0600 0.50 6.00 W.O. M 5 P entry s95assembly and and lay down.
ak up side entryer h
0600 1300 7.00 13.00 WO. M 4 P Make u
Makeupof and surd an
Bakee overshot and Bumper sub on 5' T pipe and run in hole to 1760e. Oiaio pammetem, 2r k,
. RIN Tnt aO i
alb set down on TAM pecker hydmuflc release fish neck on pecker.
pas
Release. RT=125k. 10 rpm=Ito
the mss
Release peer with roblow b me right Observe flub tlmp in well ant excess PUW and tlreg. Pull cul rills hole T/11.880'
layng down single and blow darn nip drive.
1300 2000 7.00 20.00 W.O. M 4 P Pull out of hale Fit 1.600 wtih TAM packer, rocking bark stands In dent& pumping 96 Nig brine at 10 bob and pipe
displacement no comma to sena W.
20:00 21:001.00 21 00 W.O. M P Pull wear 9 an Install mouse MIe n Mary u le.
21:00 22:30 1.50 22.50 I W,U I ed 1 I P Clean and clear flan. Ramose pass and takes Mm pipe shed. Farmers b lay down poll pipe. NOS thread pmbctors.
2230 0000 '.50 00 W.j M d P Smd laying therm drill pipe hom derrick to pipe shed using mouse mile.
1 Pumped 220 ibis of 9.6 ppg know imp well the last 24 &urs.
Gas Readings
Avg Background Gas (%)
Max Background Gas (%)
Avg Connection Gas (%I
Max Connection Gas f%)
Avg Drill Gas (•h)
Max Drill Gas J%)
Avg Tip Gla (%I
Max Trip Use I%)
Daily Mud Volumes
TanMAddMOMLoae
Type
De¢
Volume (Wall
Tank
Active Piln
Hole
Hole
Loss
Formation
Well Name: SP05-FN7 OR
Wellbore Name: SP05-FN7
Well Code: 26944
Job: WORKOVER
WCER Level:
Daily Report
Date: 11/24/2018
Report #: 26
Page: 2 of 2
Cumulative Mud Volumes
Active Volume(bbl)Hole Volume di Additions(bbp
Cum Accidents Uml) Loseastbb1)
Cum Losses(bill
0.0 0.0
0.0
00 0.0
1,094.9
Daily Contacts
Position
Contact Name
Company
Title
Small
office
Mobile
Ent represenblive
Brace Sim....
EM
Drilling SUPir.
sCIdrd1mg@empeImWdm.wm
907-665.0715
Eta representeme
Mike Gmbh
Em
Waling Supv,
siddnllingQats etmlaum.com
907-685-0715
Erni representative
Wade Thomas
Ery
Rig Clerk
AKRIgClerkaDoyonl5®enipstmleum.
9075854)722
Enl representative
David Leonard
Ent
HSE
com
Eni represenbWe
Math Hubbr
Eal
HSE
Tod Push Justin
He,
Doyon Drilling
Tool Pusher
rigl5@doyonddllmg.wm
Tool Push
Ted Kruger
Doyam Drilling
Tour Pusher
rg 15@dopntltlllir,Cmn
907-6050716
Tool Push
Humid Richardson
Dayan Drilling
HSE
hdchardson@dopndrilling.com
8854)796
Tool Push Scot
Simmons
Doyon OrBing
HSE
Personnel Log (POB)
Company
Sam. Type
Work H (hr)
Stand-by H len
count
Note
WYpn
Field uperintendent12.50
0
dating
Ldtle, Red
Pumping
12.50
0
Drilling
ASRC
Company Man
12.50
1
Dulling
ASRC
Clerk
12.50
1
Drilling
ASRC
SOA
12.50
1
SID Support
ASRC
Gane Advisor
12.50
1
SID Support
Beacon
Medic
12.0
1
SID Support
Northern Chihli Semites
Fuehr
12.50
1
SID Support
Verso Gray
Wellhe ul Service
12.50
1
Dtllling
TAM
packers
12.50
1
Dulling
institution
Hallibudon
12.50
1
WOing
Baker
Fishing l Packets
12.60
1
Drilling
ACS
Enviromenlal
12.50
2
SIO Support
Beacon
HSE
12.50
2
SID Suppod
Caton
Tool pushers
12.50
2
Dnging
Doyon
RISE
12.50
2
Dumg
MI SWaco
Mud Plant
12.50
2
Drilling
ASRC
Logistic
12.50
4
SID Support
Ml Seraw
WIF
1207
4
SID Support
FumM1
Secudry
1250
5
SID Support
Schlumberger
Wireline
12.50
5
Dolling
Jacobs
Track tlmar l Crane operator12.50
10
Ddtling
ESS
Catering
12.50
10
SID Support
Doyon
Rig P...mail
12 50
22
Drilling_Tolal Dnlling Personne151
BOP Stack 8 Components
Na.,h dme
Start Dab Last Certification Data Pressure Rating Joan
Type Make Madel
ID Nom (In) I
P Rouge (pap Last Cert Data
Slow Circulation Rates
Pump Number. Make:
Model:
Start Data End Date
Liner she lin) Volume Per Stroke Override lbbllethJ Max Pr.aauslash
Date
Depth (WSJ
I Slow S xI I
Stmkes (spm) P Joel)
Eff F%I
D Flow (9Pm)
Daily Bulk
Supply [%m Description: Equipmem Fuel
Unit LabN:
Gat
Unit size: 1 Note:
Date Oonsumed ennoo vetl
Rehrnetl
Cum Lonaumed
Cum Reca[ved Lam Returned Cu. On Lx
Note
11242018 1.301.0 1,301.0
3],5]]0
33.57].0 no 0.0
Supply Item Description: MW Plant Bollen
Unit Labe[:
Gal
Unit Size: Note:
Data Consumed lRemehead
Returns tl
Cum Consumetl
Lum Rewhatl Cum Returned Cum Cn Loc
Note
112412018 420 420
1.050.0
1.050.0 00 0.0
Supply )tam Description: Rig Fuel
Unl[ Label:
pal us
Unit Sia.: 1 Note:
Dale Oonsumed Recalved
Returned
Cum Consumetl
Lum Receivetl Cum Returned Gum On Loc
11242018 2,4250 0.0
47,98].0
55,2710 0.0 "304.0
lease
Supply gem Descupdoo: Big Water
UnItLabel:
bbl
Unit Size: t Note:
Doh Consumed Receivetl
R.Wlnad
Lum Consumetl
Cum Received Cum Returned Gum On Loc
Nob
112412018 390 00
1,091.0
1.2430 0.0 1520
Supply lam Description: WIF Boilers
Umt Label:
Gal
Unit Size: Note:
Oab Consumed Recehetl
Returnetl
Cum Consumed
Cum Received Cum Returnetl Cum On Loc
Nole
1124Y2o18 196.0 1980
4,950.0
4,9500 00 0.0
Supply Rem Des. Aram, WIF Injected Diesel
Unit Label:
Gal
Unit Siee: Note:
Done Consumed Recall
Returned Cum
Lum No eased Cum Returned Cum On Loc
Note
11242018 4200 420.0
-Consumetl
945.0
9p500 0.0 0.0
Last Authority Vi51t
Data Tot Insp. her
Total I.N.C. number Comment
112112018
BOP Test, AOGCC Boon Bl"estness to BOP test, nail lest due 11282018
STOP Cards Submitted
C."
d Rpls
Com
Wan Dmlin9
9
Doan Dnlling Inc.
9
COW COW
Wpn Will, Inc.
9
HRwS
Wood Dtllkng Inc.
19
Safe Cards
MI Sweco
4
RIR's
MI S.C.
2
HARCIJSA
General Notes
Cnmmene
Well Name:5-FN7 OR
Wellbore Name: e: SP05-FNFitt
Well Code: 26944
a'a Job: WORKOVER
entl WCER Level:
Daily Report
Date: 11/25/2018
Report #: 27
Page: 1 of 2
Well Header
PermlBLoncesabn N° Operator Subsidiary Initial LaM1ee Cotle
ALASKA ENI PETROLEUM ENI Petroleum Co. Inc. DEVELOPMENT WELL
Rotary Table Elevatipn(t) Water Depth ad Find Fbingli RKB-Base Filings (R) RKB - Tubing Spool (A)
53.62 000 1S 9] 3665 31.74
Rigs
Me Name Cnancs, Me Type RigNUm Rig start Date Rig Release Date
RIG 15 DOYON LAND RIG 0723 lV2512017
Daily Information
Weather Temperature(°F) Wind Days LT1 ldays) Oays Rl(it".) POS
Cloudy WC -26- -0.3 NE @ 30 MPH 383.00 36300 18.0
Safety incidents - Near Miss
One Category Type Subtype Severity Cause Losttime7
Comment
Safety Drills
Days Umil Nen Check
Type
a Occur
Last Date
Nen Date
ways)
Autheny Vail
2 111212018
112812018
3
Fire Drill
6 11/142018
11282018
3
Kick While Tripping
1 111112010
1111212018
-13
Kick While Tripping Drill
3 11/512018
1111212018
-13
Man Down Drip
1 112/2018
1/31/2019
67
Rig Inspection
27 111252018
11262018
1
Safety Meeting
27 11/252018
11262010
1
Sall Drill
4 11/1712018
12/12018
6
TT BOPE Drill
1 11/152018
11292018
4
TT Dirmor Drill
1 111182018
5/1]2019
173
TT H2S Drill
31[1102018
218.2019
75
TT Kick While dr9png
1 11/612010
1102018
-18
TT Kick While Tdppin9
2 11/11/2018
111122oi8
-13
TT Man Down Drill
3 11/11/2018
11/12/2018
-13
TT Ry Evacuation DMI
2 11182018
2/62019
73
TT Spill Nil
1 111252018
12/9/2018
14
TT Shipping talk
2 1111312018
21112019
78
TT Well Kid Drip
1 11n12018
VU2019
72
Casings seat
Can. Type
Do (in)
to (in)
Grade
Top RIGS)
I Bonom(ftKB)
I TVD R. HOUR
Run Date
CONDUCTOR
160.0
160.0
111/2011
CASING
133/8
12.42
LA0
-0.1
3.809.0
2,452.5
12/192012
CASING
95/8
am
LA0
0.1
11.9880
3,995.0
12/302012
LINER
5112
495
L-80
11,771.0
2DBT50
3.901.0
1/172013
LINER
3 1/2
20,616.620,673.0
3,901.6
5/312014
Last Cementing
Cementing Short Dade: 502016 String: LINER. 20,67301MB Comment: 3 5" X 5.5" liner hanger/ packer set Inside 5.5" liner. TO lint @ 20.618', btm of0oat shoe @ 20.673.
Stg k Top ItK 3)
Top Meas Meth
Bfm Rill
Co.
1 20,618.0
20 673.0
SLB Tall poen to 0 psi. SLB pump 25 bbls 10.5# MudPush. 25 thinks 1 cement drop 5' wiper ball, 15 bible
10.5a MUdPush and rig displace wl 184 bble slick water, Sling into finer packer and squeeae cement al 43 bots of slick
water. CIP @ 1010 has
Job Information
Joe Phase Planrretl Start Data sten Data End Data Ps0 Duration (days)
WORKOVER 10130201818:00 10/30201018:00 0,00
Daily ummay Opereaons
24h Forcesat
Prepare t0 ran completion. Stan Completion.
2" $..A,
Finish laying down 5- TT526 unit plan from Gera, out of mouse buss. Change out sever sub. Prepare to nn compl¢tlon. Take on 246 bon of brine to rg. Lay harm V hare ling equipment. Hang ESP sheave
Operation at 07.00
Prep Toch 8 Equipment t0 RIF! W/ESP Assembly.
SIM OPS: Prep for SLcklme Operations on SPI18-N5
time Log
Start End Cum Dur
Time Time Our 1M1r) Rbn Phase Our, I Act, I Plan Oper. Deacr.
00:00 11:30 11.50 11.50 W.O. M 6 P Continue b lay dawn 5 doll pipe from hero k with mouse hole. Adding 10 bar of 9.6 ppg bone to well.
1130 00:00 12.50 24.00 W O. M 1 P .. rind pipe fall India and. Tum Kely hose olamp. Cleansed cheer or. Change ON Saversun on soldiers, to 4.5' IF
mninfica n for volanl tool. MOB tubing hanger. Hang ESP sheave. Take on 248 obit of 9.8 ppg brine. Inatall new header on
Water line in pump mom. Remove 5-beasking equipment from ng Boor. Continue 0 add 10 bph of ohms to hob.
Pumped 240 obis of 9.6 brine into hole.
Gas Readings
Avg Background Gas I%)
Max Background Gas 1%) Avg Connection Gas I%)
Maa Connection Gas (%)
Avg Drill Gas 61
Maa Drill Gas(%) Avg Trip Gas (%)
Maa Trip Gas (%)
Daily Mutl 0lames
Tanfa MdiRionlLoss
TypeDes Volume ell
Tank
lPits
Hole
=01
H01¢
Loss
Formation
Cumulative Mud Volumes
Active Volume (but)Hole Volume (bbl) Additions (bbl) Cum Mundane long Losses (bull Cum Losses pi
0.0 0.0 0.0 00 00 1.094.9
Daily Contacts
Position
Contact Nam¢
Company
This
Email
Office
Mobile
Eni reWesema&e
Brace Simonsen Ern
Drilling So,
inamel¢um.corn
907Ae5-0]15
Eni representafrva
WA.Grubb Eni
Drling Supv.
:namrs"ahly
siddrilling@ampetrol¢um.com
907A85-0715
Well Name: SP05-FN7 OR
Wellbore Name: SP05-FN7
Well Code: 26944
Job: WORKOVER
WCER Level:
Daily Report
Date: 11/2512018
Report #: 27
Page: 2 of 2
Daily Contacts
Position
Contact Name
Company
Title
Small
Office
Mobile
Ent represeniadi.
Wei
End
Rig Ctar,
AKR,ChrksOnyon l 51tterap.trole.n.
907-685-0722
Ent representative
David Leonard
Eni
HSE
com
Eni represenbtive
Mark Hubler
ed
HSE
Tod Push
Justin Hays
Doyon
Drilling
Tool Pusher
rS15@dc mftfltng.mm
Tool Push
Ted Kruger
Doyon
Drillilg
Tour Pusher
riglS@doy dHiling.com
907$650710
Tool Push
Hamid Rtchardson
Doyon
Dnikng
HSE
hnchantson@doyondrllfng.com
61
Tool Push
Scut Simmons
Doyen
Drilling
HSE
Personnel Log (POB)
Company
Serv. Type
Work H (hr)
Stand-by H (hi
Count
Note
Doyon
Fient Superintendent
12.50
0
Doling
Uth, Red
Pumping
12.%
0
Drilling
Schlumbei
Wireline
12.50
0
OHIIIng
Baker
Fishing I Packers
12.50
0
Dnllhg
ASRC
Company We
12150
1
Drilling
ASRC
cli
12.50
1
Drilling
ASRC
SOA
12.50
1
SID SuppoH
ASRC
Gane Manor
12.50
1
SID Support
Beacon
Medic
12.50
1
SID Support
NorOrern OrKwed Services
F.wIm
12.50
1
SID Support
Vebn Gray
Wellhead Service
12.50
1
D.111n9
ACS
Envlrorri
12.50
2
SID Support
Beacon
HSE
12.50
2
SID Support
Doyon
Tod pushere
12.50
2
Drilling
Doyon
me
12.50
2
Drilling
MI Swaco
Mutl Plant
12.50
2
DiUm,
ASRC
Logistic
12.50
4
SID Support
MIS...
WIF
12.50
4
SID Support
Milithoon
Saudi.
1250
4
Drilling
Purcell
Security
12.50
5
SID Support
Jambs
Truck diI Crone operelor
1250
to
Dolling
ESS
Catering12.50
10
SID Support
Doyan
Rg Personnel
12.50
22
Driung Total Drilling Personnel 53
BOP Stacks Components
Description
Start Date Last Certification DatePresame Rating (psi)
Type Make Model
IO Nan im,
PRarrge(psi) Last Cert DaW
Slow Circulation Rates
Pump Number: Make:
MoEeb
SWN DUN End Date
Uner Size (int Volume Per Stroke Override
(bbllstp Max Pressure (psi)
Date Depth(1003)
Slew Sptl
Stookes(sprn
P(pai) I
Eff(°A) OFlow Isom)
Daily Bulk
Supply add Descriptions: Equipment Fuel
Unit label:
Gal
unit size: t Note:
Oete Consumed Received
Returnetl
Cum Cpnsumetl
Cum Received Cum Returned Cum On Loc
Note
11258018 1 B%.035,47].0
00 00
Supply Nem Desp rip8on: Mutl PMd Bailers
Unit Label:
Gel
Unit Size: Note:
Gate Consumed Receivetl
Returmtl
Lum Consumetl
Gum Received Gum Returned Co. On Lec
Note
114258018 420 42.0
1,092.0
1,092.0 0.0 0.0
"andylWm Desefiptlon: Rig Fud
Unit 1.21
gal us
Untt Sise:1 Note:
Dab Consumed
Returnetl
Cum Consumed
Co. ReceNed Cum Returned On Loc
Note
11425rzm6 2zm incense
5o,55z0
Pont
55,2710 O.g 4.714.0
Suppl,kno DeloHpeon: Retainer
Ustutall:
bbl
Unit Sire: 1 Note:
Cafe Consumed Received
Returned
Cum Consumed
Cum Received tum Returned Cum Dn Loc
Nde
118M2010 50.0 0.0
1.i4L0
1,2430 O9 102.0
Supply Item Description: WIF Boders
Unillabel:
Gel
unit size: Note
CMe Consumetl Receivetl
Returned
Cum Consumetl
Cum Received Cum Returned Cum On-
Note
11252010 180.0 1980.
5,148.0
5,148.0 00 00
Supply Item Description: WIF Initiated! Diesel
Unit label:
Gal
Unit size: Note:
Date Consumetl Receivetl
it
Cum Consumetl
Cum perceived Cum ReturnedCo. On Loc
Nde
N42542e18 420.0 4200
9,070.0
8,0700 00 00
Last Authority Visit
Oats Tot insp. She
Total I.N.C. number Comment
11818016
BOP Teel. AOGCC Brian Bixpywitness to SOP test, nest test due 118880113
STOP Cards Submitted
Company
0 Rpts
Com
oane Dtllpng
it
PJSM'S
Doyon DHHng Inc.
8
COW
Doyon DHIIng Inc.
8
HRWS
Doyon Drilling Inc.
20
Sade Cards
MI S.C.
2
HARCIJSA
MI Swaco
4
RUT.
General Notes
Comment:
Well NameOR
:
Wellbore Name: e: SP05 SP05-FNFN7
Well Code: 26944
r
�awp'n Job: WORKOVER
em 1111 WCER Level:
Daily Report
Date: 11/2612018
Report #: 28
Page: 1 of 2
Well Header
Permldconcession N° Operator Subsidiary Ini0ial Lahee Coria
ALASKA ENI PETROLEUM ENI Petroleum Co. Inc. DEVELOPMENT WELL
Rotary Table Elevation R, Wakf Oepm lit)First Flango,.) RKB -Base Flange (it) Ii -Tubing Stmal(it)
5362 0.00 16.9] M65 31.74
Rigs
Rig Name Contractor Rig Type Rig Num Rig Skirt oak Rig Release Dale
RIG 15 DOyON LAND RIG 0123 12125201]
Daily Information
Weather Temperakre (°F) Wind Days LTI (days)Day. RI (days) POB
Mod, WC -20° 6.8 NE @ 37 MPH 364.00 354 00 A.0
Safety Incidents - Near Miss
Data Category Type Subtype Severity Cause Lost time?
Comment
Safety Drills
Days Until Next Check
Type
#ur Occ
Last Data
Next Date
(tlays)
Aulepriy Viso
2
1121/2018
1112812018
2
Fire Drill
6
11/148018
11126/2018
2
Kick While Topers
1
1111112018
111122018
-14
Kick While Tripping Dri0
3
11158018
11/122018
-14
Man Down Dell
1
112n018
1/312019
66
RIg Inspection
28
11!162018
111272018
1
Safety Melling
28
111268018
11878018
1
Spill Dell
4
11/178018
IVII2018
5
TT BOPE Drill
1
11/158018
11n9n018
3
TT Brother Drill
1
11/102010
61178019
in
TT MS Drill
311/102018
2/812019
74
TT Kick While drilling
1
11/6/2016
l IU12018
-19
TT Kick While Tripping
2
11/11/2018
lllID2018
-14
TT Man Down Drill
4
IIW2018
11272018
1
TT Rig Evacuation Grill
2
11188018
2/88019
72
TT Spill Drill
1
11852018
12/92010
13
TT Stripping doll
2
11/1WO18
2/118019
]]
TT Well Kill Drill
1
1102018
2152019
71
Casings seat
Cas. Type
Do (in)
I IDpn) Grade
Top f9KB)
I B..Iftlte)
I TVD Rot I.KB)
Run h -
CONDUCTOR
160.0
160.0
CASING
13318
12.42 L -M
-0.1
3.9080
2,452588012
ill.
CASING
9518
8.84 L -BO
111
11,98903,895.008012
LINER
518
495 L-80
11))10
20875.03,901.08013
LINER
312
20,616.fi
208]3.0
3901.4
Last Cementing
Colorado, Start Dak: 508019 Soing: LINER. 20,6)3 OM(B Comment 3.5"X &S' liner hanger/ packer set inside 5.5" liner. TO liner @ 20,618', him of Coat shoe a 20,673'.
Sig # Top INKS)
I Top Meas Meth
BM (DKB) I Corn
1 206 8.a
2.8)3.0 SLB Laid Imes to 3500 an. SLB Pump 25 ob1.10 5# MudPush, 25 hots 15.84 cement, drop 5' wiper ball, 15 bble
10.5# Mud%sh and rig displam an 184 bbls suck water. Sling Into liner packer and squee8e amort w/ 43 bots m slick
water. CIP @ 1010 hm.
Job Information
Job Ph.. Plannetl Skrt Date Skrt Date End oak PSO Duration(tlays)
WORKOVER limaGois10:00 11000n0181800 0.00
Daily Summary operations
24h Forecast
Test BOPS. Prepare to den completion. Stan Completron,
241, Summary
While walking on weeper: Prep Tools & Equipment to RIH W/ESP Ass¢mdy, Continue To perbrm maintenance, Clean and painting rig. Clear Odor of X -0's and handling subs.
Operation at 07.00
Operations suspended due to Phase 3 weather conditidns.
Time LOg
Start End I Cum Dur
Time Time Our(b) (or) phase Get.Act Plan Opel. Base,.
I
00:00 10:30 10.50 10.50 W.O.no24 P Prep Toola & Equipment to R111IE P Assembly, tested derrick camera. tine to paint rig floor and mud p85. MOS to rig
ikor X-0 and pups kr completion. Teat 4.S IF FOSV. Clean and clear floorof X -0's and handling subs.
mI 00:00 I 1350 14,W W.O. ss 22 TWOt While wahirg on phase 3 weather lmkll mud pump #1and #2 Red wash dealing evil Labeling Unity lima and cabiade
1 doors. MOB teat ping k beaver slide. Wire In new cable for BOP doth slop Lank high level aleor.
Gas Readings
Avg Background Gas (%)
Max Background Gas (°6) Avg Connection Gas h) Max Connection Gas (%I
Avg Drill Gas(%)
Max pill Gas l%) pvg Trip Gas (%) Max Trip Ga. (%)
Dally ud Volumes
T.sJoAdtldkNLma
Type I
Des
V.I.. Ribg
Tank
Active Pits
Hole
Hine,
Loss
Formation
Cumulative Mud Volumes
Active Volume (bbl) HOM Volume (bbN Adtlfirms (bbl) Cum Atltlhbns (bb0 Los... Bud!) Cum Losses (bbl)
0.0 00 00 OD 0.0 1.094.9
Daily ontacts
Position
Contact Name
Company
Tide
I Email
I office Mobile
Era repr.aentmi
Bruce Simonson Eni
Dolling 5upv.
aiddnlling@enipebokum.com
90"a Uri,
Ent representative
Mike Grubb Eni
Dulling 5upv.
aiddolloq@sZod'okum.dem
90)885.0)15
Enl mprasemW
Wade Tiromaa Eni
R,Clerk
AKRi,CicftDoynnl5@enipeboleum.
90]685-0)22
Em represemative
David Leaned Enl
HSE
Well Name: SP05-FN7 OR
Wellbore Name: SP05-FN7
Well Code: 26944
Job: WORKOVER
WCER Level:
Daily Report
Date: 11126/2018
Report #: 28
Page: 2 of 2
Daily Contacts
Position Contact Name
Company
Title
Email
Office
Mobile
Ent mdnsseniatW Mark Nobler
Ent
HSE
Tod Push Justin Hays
Doyon Drilho
Tool Pusher
ngl5@donyondnlling cent
Tad Push Ted Kruger
Doyon Drilling
Tour Pusher
rig/5@de,ontlnlling.com
9078850716
Tool Push Ronald Richardson
Doyon Drilling
HSE
hnchardson@dayouddi ing.mm
685-07W
Tool Push Scott Simmons
Doyon Dtllling
HSE
Personnel Log (POB)
Company
Bene. Type
Work H (hn
Sta d4,y H Din
Count
Note
Doyon
Field Superintendent
12.50
0
Drilling
lode Red
Pumping
12.50
0
Drilling
SChiurrompur,
Wireline
12.50
0
Drilling
Baker
Fishing I Packets
12.50
0
Dnlling
ASRC
Company Man
12.50
1
Doming
ASRC
Clerk
12.50
1
Drilling
ASRC
SOA
12.50
1
SIDSUppdri
ASRC
Cane Advisor
12.50
1
SIDSUppdri
Bandon
Medic
12.50
1
SID Support
Moment OfHead Services
Fouler
12.50
1
SID Support
V.I. Grey
Wellhead Service
12.50
1
Drilling
ACS
Environmental
12.50
2
SID Support
Beacon
HSE
12.50
2
SID Support
Doyon
Tool onshore
12.50
2
Drilling
Doyon
HSE
1250
2
Drilling
MI Banned
Mud Pizza
12.50
2
Ddling
ASRC
Logistic
12.50
4
SID Support
Ml Sworn
WIF
12.50
4
SID Supped
Hatiburton
Biicidoe
12.50
4
Ddling
Purnell
Become
12.51)
6
SID Support
Jacobs
Truck cover l Crane operator
1250
10
DtlYing
EBB
catering12.50
11)
SID Support
Doyon
Rig Personnel
1250
22
Onlfmg_Td1aI Dnlling Personnel 53
BOP Stack 8 Components
Description
Start Dste Last Certification Dale Pressure Rating (pap
TypeMaka
Model
ID Nam(IN
PRange(psU
T Last Cert Deb
Slow Circulation Rates
Pump Number: Make:
Model:
Stan Date End Uate
Liner St. (I.)
Volume Per Stroke Override (bbllstld Max Pressure(pap
Data
Djp[ SKB)
Slow Sotl
Strokes(spm)
P(Pat)
EN Is) 1 0Flow(gpm)
Daily Bulk
Supplyltem Descrlp6on: Equipment Fusl
Unit "bel:
Gal
Unit Size:I
Note:
Date Consumed Received
Returned
Oum Consumed
Cum Received
Cum Returned Cum On Lee
Note
11262018 1463.0 1.46J.0
36,9360
36,936.0
0.0 0.0
Supply Ilam Description: Mud Plant Bongcrs
UMt Label:
Out
Unit Size:
Note:
Dew Consumetl Received
Returned
Cu- Consumed
Lum Receivetl
Cum ReNrnetl Cum On Loc
Note
11262018 420 420
1,139.0
1,134.0
0.0 0.0
Supplyltem Descriptin: oRug Fuel
Unit Leber.
gal us
Unit Blze:I
Note:
Dine Consumetl Received
ReNrnetl Cum Consumed
Cum Received
Cum ReNrnetl Cum On Lac
Nota
11262018 2,430.0 0.0
52,907.0
55,2710
00 2,284.0
Supply drum Description: Rg Water
Lou label:
bbl
Unit Biu: 1
Note:
Dain Consumetl Received
Returned
Cum Consumetl
Cum Received
Cum ReturnedCum On Loc
Note
112&2016 36.0 135.0
1177.0
1,378.0
00 201.0
Supply Nnn Deseriptlon: WIF Boiled
Unit "bel:
Gat
Unit Size:
Note:
Drto Received
Retunletl
Cum Conapmetl
Cum Receivetl
Cum Returned Cpm On Loc
Note
Presumed
1 V2612015 198.0 190.0
5 346 0
5,346.0
0.0 on
Supply Item Description: WIF Injected Diesel
Unit Label:
Gal
Unit Size:
Note:
Data Consumetl Receivetl
Retumed
Cum Consumetl
Lum Receivetl
Cum Returned Cum On Lee
NoOe
n262016 6400 810.0
10,710.0
107m.a
0.0 0.0
Last Authority Visit
Date Tot insp. Nbr
Total A.C.Lnumber Comment
11212018
BOP Tesl. AOGCC Brian Bivpy whness
to SOP test, next test due 11202010
TOP Cards Suomill
Company,
4 Rpts
Con
Doyon Drilling
4
-
pi -6 -MT -Cohen OIL, Inc.
11
Sake Cards
Doyon Dnlmg Inc.
4
HMS
Doyon Drilling Inc.
4
COW
Ml S..
5
MRVJSA
MI Swaco
4
RIWs
General Notes
Commend.
Well Name:S
Wellbore Name: e: SP05-FNPOS-FN7
Well Code: 26944
e��1l
p9 e'e Job: WORKOVER
1111 WCER Level:
Daily Report
Date: 11/2712016
Report M: 29
Page: 1 of 2
Well Header
PermlVConcessbn N° Operator
hubs tllary dnNal Loh-Cotle
ALABKA ENI PETROLEUM
ENI Peeoleum Go. Inc. DEVELOPMENT WELL
Rotary Table Mershon for WMet Oso -(-I
First Flange(N) RKB-Base Flange IN) RKB-TUMng Spool (it)
5362 000
1691' 38.65 31.74
Rigs
Me Nem. Contreclor
Rig Type Rig Num Rig Sbs Date Rig Release Date
RIG 15 OOVON
LAND RIG 0723 12/2512017
Daily Information
Weather ed -F)
Wind Drys LTI(days) Days RI (days) POB
Cloudy WC -23° 32
NE @ 29 MPH ME 00 136500 80.0
Safety Incidents - Near Miss
Date category Type
Subtype Severity Cause Lost time?
Comment
Safety Drills
Days until Next Check
Type
#Occur
Last Date
Next Date
(days)
Authority YsO
3
11272010
12/4/2018
7
Floe Drill
6 1111412018
11202018
1
Kick While Tripping
1 11/112018
11/122018
-15
Kick While Tripping Drill
3 11/512018
11/1220111
15
Man Down Cut
1 11,22018
1212019
65
Rig Inspection
29 11272018
11282018
1
Safety Meet,
29 112712018
11282018
t
Sol Drill
4 11/172018
Maria
4
TT BOPE Drill
1 11/152018
1112912018
2
TT Dwerter Drill
1
it 018
V17MO19
171
TT H2S Drill
3 111102018
2/0/21119
73
TT Kick While dfdling
21127I2D1a
11282018
1
TT Kick While Trail
2 11/112018
11/122010
-16
TT Man Dawn DOM
4 11282018
11272018
0
TF Rig Evacua00n Orill
2 11A82018
2 019
71
TT Split DCII
1 11252010
12/912010
12
TT Stripping hill
2 11/1312010
V11/2019
76
TT Weil KIII Drill
1 1122010
2/52019
70
Casings seat
Cas. Type
OD (in)
ID pn1
I Gratle
Top frtKRi
IBottom fNKelI
TVD Ba. insult
IRun DaM
CONDUCTOR
1600
160.0
1112011
CASING
13 we
12.42
L-80
`01
3,909.0
2052.5
MWM12
CASING
9518
8.04
L-00
0.1
11,959.0
3,995.0
IMW2012
1
LINER
512
4.95
L-00
117710
20.8750
3,9010
1/172013
LINER
3 t2
20.616.6
20,873.0
3,9010
522014
Last Cementing
Committee Start Data: Wa014 String: LINER, 20.673.011KB
Comment 35 %5.5" Ilner Mnger/ packer sel Nside 5.5' Mner. TO finer @ 20.618', btm of goat shoe @ 20,673.
S[g# Top fNK81
Top Meas Mem
Ben ("BICan
1 20,81a.0
28673.0
SLB Tasl lines to 3500 psi. SLB Wmp 25 bids 10 5# MudPOsh. 25 MIs 150# cement drop V wiper bell, 15 able
10. Be MudPush and rig displace wl 184 bids slick water. Sting into liner packer and squeeze cement wl 43 ibis of slick
water. CIP @ 1010 hrs.
Job Information
Job Phase Pbn.0 Stare Data
abrt Dat. End Dab P50 Duration (days)
WORKOVER 10130201810:00
10130201818:00 Opp
Daily Summary Operations
24h Forecast
Prepare b run complebod, mash ESP assemble and complete fit fest Pick up bbing and mn ESP in hole,
24h Summery
While wailing on weather Perform mainbnt on dg unto 1400, Rig up and test ROPE. Mobilize GBR and Baker equipment and start dg up, prepare for completion intal.tion.
Operaker at 07.00
WU Spooling UnIU Prep to RIH
Time Log
Sort
End
cam Our
Tars
Time
Dueler)
fur)
Phase
Ops.
AOI
Plan
Doer. Descr.
00:00
1400
14.00
1400
WO.
M
22
TW01
Waiangon3weather.
SIM OPS: Install ECD $.a in pump mom. MOB fast plug to rig floor. Rig up lest no. antl chart mcordef for BOP last.
Replumb water to teal pump. Shovel snow and walk ways. General maintenance and housekeeping. Clean and Painting dg.
Confine la pump 10 ads 0 Be Me bmre every hour into well
7400
15: W
1.00
15.OD
WA
C
12
P
Phase 3 weather IffMA @ 1400 Hm. Reaumed SP05 well work operations. Rig up to test DOPE. Flood lines and anti
equipment with fresh water.
1500
2000
5.00
20.00
W.O.
C
12
P
Tas180PE 2WI3500pai for 5 minutes, witness waived by AOGCC rep Je Jones. Test act gas alarms. Test PVT, flow ahmv
and alsems. Test annular, upper and lower pipe rams. HCR #1 ant 42, HCR MI #1 and K2. #1 and t2 demon valves, Upbeat
ant lower I80P. Dart and FOSV. Choke manifold vanes 1-15, Mambl Order valves #1 and #2. Blind shear valve, Manually
opereted choke and remotely operated choke at 2500 psi bleed off. Prebrm Koomey drew don bel: Sort pressure
nrmlar--1375 psi, man 5ad=1450 psi, Aco=3000 psi. After all Nnc4ans: annular -1450 psi, manMd=1400 poi, acorM psi.
seconds, full e .a. in fit ses. Nitrogen back up=b@ 2950 psi averega.
200 ped in i6 preIDottles
FO—OD
2100
1.00
21.00W.O.
C
112
1P
IRg down test equipment antlblow down.
21 Do
TO OD
3. D
24.00
W.O.
K
20
P
M Ilse GBR antl Baker equipment b rig floor Load pace shed with Baker ESP equipment Rig up GB RT tool and pourer
bogs. Hang cap line sheave with snake. Continue to Mi hole with 10 bph of bre. Permitted 240 bba, of 98 brine into hole.
Gas Readings
Avg Background Gas I%)
Mea Background Gas(%)
Avg Connection Gas I%)
Max Connection Gas l%I
Avg Drill Gas 1%) I
Max... use 1%1
Avg Tdp Gas (%)
Max Trip Gas f%)
airy Mud Volumes
TanMAddlttonil...
I
Type Des
Vdume@60
Tank
ACOve Pita
Hole
HOW
Loss
Formation
Well Name: SP05-FN7 OR
Wellbore Name: SP05-FN7
Well Code: 26944
Job: WORKOVER
WIDER Level:
Daily Report
Date: 11/27/2018
Report #: 29
Page: 2 of 2
Cumulative Mud Volumes
Active Volume flan) HON Volume (bbp AtldiWns(bbp
Cum Additional Nal Losses
(bbp Cum Lpaces (bb)
00 0.0
00
D.0
00
1,094.9
Daily Contacts
Position
Contact Name
Company
Title
Email
Office
Motile
End representative
Bence Simonson
Eni
Drilling Sup,
aiddmling@empetioleanCom
w7885-0715
Eni representative
Mike Grubb
End
Drilling Sup¢
m1drillingtgempetr0leum.mm
907885-0715
Eni rapresenlatime
Wade Thomas
Ent
Rig Clem
AKRigClemsDoyon l 5@9nipetmiem,
907{65-0722
cam
Em smoaenhlive
Dead Lecnad
Elm
HSE
End representative
Mark Hubiar
Em
HSE
Tool Push
Justin Heys
Doyon Drilling
Tad Pusher
ngl5@doyonddiling.com
Tool Push
Ted Kruger
Doyon Dnllm,
Tour Pusher
rigi5@doyandm ing.wm
907$853716
Tool Push
Hamid Richardson
Doyon Drilling
HSE
hnchardson@,doondrllling.wm
685-0]96
Tool Push
ScoOStmmons
Doyon Doling
HSE
Personnel Log (PO
BJ
Company
'13ker
Sets. Type
Work H lhn
Stand-byH art
Cpun[
Nob
Fishing Packers
1 . 0
0
Drilling
DDym
Field Superintendent
12.50
0
DElling
Schlumbergo
Wireline
12.50
0
Drilling
ASRC
Company Man
12.50
1
Dulling
ASRC
Clem
12.50
1
Drilling
ASRC
SOA
12.50
1
SID Support
ASRC
Creme AMisor
12.50
1
SID Support
Beacon
Medic
12.50
1
SID Support
Northern Odlead Services
Pumkr
12.50
1
810 Support
Vet. Gray
Wellhead Service
12.50
1
Drilling
ACS
Envimmental
12.50
2
SIDSupport
Beacon
HSE
1250
2
SID Support
Doyon
Tool pushers
1250
2
Orllling
Doyon
MSE
12.50
2
Drilling
PER
Casing Service
12.50
2
Dulling
Hi limitan
Mud Loggers
12.W
2
Disking
Hellibunon
saw,.
12.w
2
DrUmg
Lane Red
Pumping
12.50
2
Drilling
MI Swam
Mud Plant
12.50
2
Drilling
ASRC
Logistic
12.50
4
SID Sup.d
Ml Smax,
WIF
12.50
4
SIDSupport
Purcell
Security
1250
5
SIDSupport
Jacobs
Truck amour Cone operator
1250
10
Drilling
ESS
Catering
12.50
10
SID Support
Doyon
Rig Personnel
1250
22
DmHng_TohI Drilling Personnel 49
BOP Stack 8 Components
Description
Start Data Last Ceimmaction Date Pressure Rating Nod)
Type Make Model
ID Non(I.)
PRem, No0Lao Cert Date
Slow Circulation Rates
Pump Number: W :
stotlei:
Stan Date End Data
Liner Size ten)
Volume Per Stroke Override RA fatk) Moa Pressure (psi)
Date I Deph(NKEN
Slow Sind
Stroke. hapml
I P(psi) I
Efff%) 0Flow(gpm)
Daily Bulk
Supply Item Doacuption: Equipment Fuel
Unit Label: Gat
unit Size: 1
Note:
Date Consumed Recelved
Returned Cum Consumed
Cum Receivetl
Cum assumed Cum On Loc
Note
112]2010 1,316.0 1,3180
38,252.0
38,252.0
0.0 0.0
Supplyltsm Osacuphon: Mud Plant Boilers
Untt bite/:Gal
Unit Sze:
Nate:
tate Consumetl Received
Returned
Cum Consumed
Cum Receivetl
Cum Returned Co. On Loc
Note
11272018 420 42.0
1,1]5.0
11]60
0.0 00
Supply Item Description: INS Fuel
Unittabei:
gains
Unitmn:I
Note:
Dade Consumed Receivetl
Returnetl
Lum Consumetl
Cum Receivetl
Cum Returned Cum On Les
Note
112]2010 22300 0.0
55,21].0
55,2710
00 54.0
Supply tte,n Desalpdion; Rig Water
UnR Label:
bbl
unit Size: t
Note:
Date Consumed Received
Retumed
Lum Consumetl
Cum Received
Cum Returned Co. On Lac
Note
112]2018 600 00
1,23].0
1,3]8.0
00 141.0
Supply Item Description: WIF ounce
Unit Label:
Gel
unit 5ize:
Note:
Ooh Consumetl Remained
Returned
Cum Consumetl
Cum Received
Cm Returned cum On Lac
Note
1127/2010 1980 19E0
I
5,544.0
, T
J.U. 0.0
Suppty Item Oescuptlon: WIF hymned Diesel
tend Label:
Gel
Unit Size:
Note:
Data Conaumed Received
Returned
Cum Consumed
Cum Received
Cum Returned Cum On Loc
Net,
11272018 620.0 L4a0
11,130.0
11.130.0
0.0 00
Last Authority Visit
Diane
Cafe Tot insp. Nbr TohI
LN.C. number Comment
018
BOP Teat, AOGCC Jeff Jones witnessed
SOP test, msd test due 121042018
S70P Cards Submitted
Co."
a adds
Lon
Doyon Drilling
5
PJSM'S
Doyon DMling Inc.
7
HRWS
Doyon Drilling Inc.
25
Safe Cads
Doyon Drilling Inc.
5
COW
Ml S.C.
1
HARCIJSA
Ml Swaco
4
RIR's
General Notes
Comment:
e....._
Well Name:S-FN7 OR
Operator BubslNlary, Intend Labe, Code
Wellbore Name: e: SP05-FNFN7
ENI PETROLEUM ENI Petroleum Co. Ica. DEVELOPMENT WELL
Well Code: 26944
0.00 16.9] 3665 31.)4
Job: WORKOVER
ani
WCERLevel:
Daily Report
Dale: 11128/2018
Report #: 30
Page: 1 of 2
Well Header
PemdtlCanceaslon N°
Operator BubslNlary, Intend Labe, Code
AUSKA
ENI PETROLEUM ENI Petroleum Co. Ica. DEVELOPMENT WELL
Rotary Table Elevation Aft) Water Oepm(it) First FWnge IR) RKB- Base Flange lot RKB-TPblog Spool (fl)
5362
0.00 16.9] 3665 31.)4
Rigs
RIg Name Cormorabr RIO Type Rig Num RIg Start Dab Rig Rel ... a Data
RIG 15 DOYON Vd4D RIG 0723 12/25201]
Daily Information
Weemer Temperature(°F) Wind Days LTl (days) Days ONPOB
Overcast
WC -24" -0.3 NE 126 MPH 366.00 36660 80.0
Safety incidents -Near Miss
Data Category TyPI Subtype Severity Cause Lost lime?
Cmnment
Safety Drills
Type
Days Until Neat Check
Aulhooy Visit
pOccur
Last Data
Ne#bate
(day:)
3
11272018
12/x2018
6
Fire Drill
6
111142018
11282018
0
Kick While Tripping
2
112812018
112912018
1
Ksk While Tripping Drill
3
11AMN 18
11/12/2018
46
Man Down Drill
1
1122018
1/31/2019
84
Rig Inspection
30
11282010
11292018
1
Safety Meeting
30
11282018
112912010
1
Spill Drill
4
11117/2018
12/12018
3
TT BONNE ONO
1
11/152018
11292018
i
TT DNerter Dell
1
11/18/2010
51172019
170
TT H2S WON
311/102m8
W8/2019
72
TT Kick While drillirg
2
112]2018
11282018
0
TT Kick While Tripping
2
11Mimi 0
11/12/2018
.16
TT Man Dawn ONO
4
1126/2018
11212018
-1
TT Rig Evacuation Drill
2
111&2018
2I62019
70
TT SPHI Onll
1
11252018
IVMO18
it
TT Sam,, drill
211/1312018
2/1112019
75
TT Well Kit Drill
1
1102018
252019
69
Casings seat
Cas. Type
OD (m)
In (in)
Gore
Top INKB)
BdtOm (kNB)
TVD Bot (MB)
Run Date
CONDUCTOR
160.0
ISITU
1112011
CASING
133/8
1242
L80
-0.i
3.9080
2,4525
1VIINOM12
CASING
95/0
SON
LA0
0.1
11,909.0
3.995-0
12202012
LINER
512
4.95
L-80
11,]]1.0
20.6150
3,901.0
1/172013
LINER
312
20,616.6
2gfi13.0
3,901.4
5912014
Last Cementing
Censuring Start Date:6n/20141 n.gp. 20,613.0flKB Comment: 3.5' K S5" liner M1engerl piker sat inside 5.5" liner. TO liner 20,818', pan of floe/ shoe 20,673'.
MeLINER.
51g 0 Top RKBI Top as Meb IBOn (tIXB) Com
1 20,618.
20,813.0 S B Test lines Is 3500 an, SLB pump 25 this 10.50 Mu Mush, 26 06615.80 cement, drop 5" wiper ball. 15 bels
10.50 MudP sh and NO displace w/ 184 bible slick water Smg into liner packer and Squeeze cement w/ 43 this of stick
water, CIP ® 1010 him.
Job Information
Job Phase PWnned Sbrt Data Start Date End Data PW Duration ltlays)
WORKOVER 1490201818:00 iW302O181800 0.00
Daily Summary Operetions
24h Farecast
Run In hole wtt 4.5' HYD 563 tubing . Making up all wtmaclons with CRT bmue turn as per GBR. Tasl wire avery1000installing cross enter damps on every connection. Continue to pump 10 bbis per hour of
96 ppg brine into well.
24M1 Summary
Prepare to run completion. Instal ESP assemble and complete Tt test. Spot and ng up spooling unit. Make ESP electoral splice and lest lines. Run in hone with ESP on 4.5' HYd 583 T/1275'.
O,ramtlon at 01.00
Run in hole with ESP @ 2,8185'
Time Log
ion EM cum or
Time Time Dur (h9 (hat Phase nor. Act Plan riper. Descr.
00:00 01:30 1 50 150 Wo K 20 P Conlinue to dg up tit mn wmpledon. Load) 5/8'shmud on sleet. Unload lobs on dg Both, MOB clamps antl tools b rig
Door, Function lest tongs spot spooling unit. UnFoad ESP assembly in pipe shad.
01:30 03:00 1.50 3.00 W.O. K 4 P Pick up shroud assembly and aeMce components.
0300 W:00 360 6.00 W.O. K 20 P RetM1 spotling spodhe unit andwoemgenaabrwhl waling anahrotM hangertoardveon SID.
0600 15:00 9.On 1500 Wo K 20 P hnlal spade in spooling unit and Test cable. Run cable and rap tube over sheaves. Imbllmud hanger. Imbll cop tuba
lins on Pump assembly Continua tit pump 10 bels per hour of 9.6 ppg brine into well.
-and
1500 19:00 4.00 19w W.O K 20 P Perform aphids on MILE to electrical spool lkm wOh ENI eladddan witness. Splice cap late and Install clamp. Continue to pump
10 IRA. per Mur of 96 ppg Win. IMo wall.
1800 20:00 1.00 Mid W.U.- K 12 P TeratESPandcaplines. CuntinuebpumplObblsper Mur 9.6ppgbrineintowell.
2000 0000 1 4.00 24M W.O. K 4 P un In hula wNt 4.5' HYO 563 tubing 1120' 111, 15. Melting up a ennnedipns with CRT Comm tum as per GBR. Test wire
wary 1000' Instilling cross coilar damps on every connection. Continue to pump 10 bible per hour of 9.6 ppb Brine into war.
Gas Readings
Avg Background Gas l%)
Max Background Gas (%)
Avg Connection Go. h)
Mas ConnectionGas (%)
Avg Drill Gas (%)
Mae Drill Gas (%)
Avg Trip Gas (%I
Max Top Gas I%)
Daily Mud Volumes
TanWAdtlMONLmS
Type
Des Volume /bbl)
Tank
A, His
Hale
Hole
Loss
,or
Cumulative Mud Volumes
Active Vplume (bell Nol< Volume 1061) gdtliNons Ibbp Cum AdtllUons (bbl) Losses (Rep Cum Losses (Obit
0.0 0 g 0.0 0.0 0.0 1.094.9
Well Name: SP05-FN7 OR
Wellbore Name: SP05-FN7
Well Code: 26944
Job: WORKOVER
WCER Level:
Daily Report
Date: 11128/2018
Report #: 30
Page: 2 of 2
Daily Contacts
Position
Contact Name
Company
Title
Email
Omw
Mol
Eni repenotalem
Bruce tonescon
Ed
Drilling Supv.
sitldnlling@enipetroleum.
90]-605-0]15
Em rep.ent.Wa
Mike Gmbh
Em
Drilling Supv.
siEniling@enipetroleumcom
907-685-0715
Eni representable
Wade Thomas
Ent
Rig Clerk
AKRigChasDoyonl5itienipelrmalmon
com
907505-0722
End reprueniather
Dead Leonard
Em
USE
EM representative
Mark HOW
Ent
NSE
Tool Push
Joel Hays
Coyon Drilling
TOI Pusher
rigl5ittloyo miling.com
Tool Push
Ted Kroger
Doyon Detling
Tour Pusher
dg15®doyorMolling.com
907-6850716
Tool Push
CIM Owens
Doyon Drilling
MSE
cowens@doyondrilling.com
685-0796
TOO Push
Scott Shoomm
Doyon Drilling
HSE
Personnel Log (POB)
Company
Sera. Type
Work H Urn
Stsnm-by H (hr)
Count
Note
Doyon
Ftem Superintendent
12.50
0
Drilling
SchWmberger
wireline
12.50
0
Drilling
ASRC
Cwngany Man
12.50
1
Drilling
ASRC
Clerk
12.50
1
Drilling
ASRC
SOA
12.50
1
SIO Support
ASRC
Crane Advisor
12.50
1
SID Support
Beacon
Medic
12.50
1
SID Support
Northern OlkeiM Services
Ful
12.50
1
SID Support
Veber Gray
weakened Service
12.50
1
Detling
ACS
Environmental
12.50
2
SID Sol
Several
ME
12.50
2
SID Support
Doyon
Tool pushers
12.50
2
Drilling
Doyon
WE
12.50
2
Drilling
Halliburton
Mud Loggers
12.50
2
Drilling
Lime Rod
Pumping
12.50
2
Drilling
Ml 8waco
Mutl PHnt
12.50
2
Drilling
GDR
Casing Serdce
1250
3
DBlling
ASRC
Loi
12M
4
SID Support
Baker
Fishing/ Packers I Carl
12.50
4
Drilling
HallAurton
SliWine
12.50
4
Detling
AN Swaw
WIF
12.50
4
SID Support
Purcoll
Security
12.50
5
SID Support
Jill
Truck drier/Crane operator12.50
10
Drilling
ESS
cultural
12.50
11
SIO Support
Doyon
Rip Personnel
12.50
22
Dnlling_TOM enking Personnel 53
BOP Sfack 6 Components
Description
Start Dae
Last Deportation Delta Pressure Rating (pall
Type Make Model
1
ID Nom(in)
PRangeJoel last Cart Deb
Slow Circulation Rates
Pump Number: Make:
Moria:
Start Dale End Date
Liner Size Ila)
Volume Per Stroke Override (bolls*) Max Preuure ta.b
Dale Oep[h uns.
Slow Spot I
Stmkes(a m)
P(psi)
Ed (91) OFlow(gpm)
Daily Bulk
Supply learn Description: Equipment Puei
Unit Label:
Gal
Unit Size: 1
Note:
Oats Consumetl Received
Returned
Cum Can Cum Received
Cum Returned Cum On Loc NO
11282018 2.0260 2.026.0
40,2]8.0
40,270.0
00
0.0
Supply Hem Description: Mud Plant Boilers
Unit Label:
Gal
Unit Size:
Note:
Dale Consumetl Received
Returned
Cum Consumed Cum Receivetl
Cum Returned Cum On Luc Note
11282018 42.0 920
1,218.0
1,218.0
0.0
0.0
Supply bem De Ap8 : Rig Wel
Unit Lahti:
gal us
Unll Size: 1
Note:
Date Consumetl Received
Returned
Cum oonsumetl Cum Received
Cum Returnetl Cum On Lac Note
111282018 2,1500 00
5],36].0
55,271.0
0.0
-2.096.0
Supply Item Description: mg WONT
Uldt label:
bbl
Unit Sloe: i
Note:
Date Consumetl Receivetl
Returnetl
Cum Consumed Cum Received
Cum Returned Gum On Loc Note
112&2010 60.0 135.0
1297.0
1,5130
00
216.0
SupM Ifem be¢cripd... WIF Boll..
Umt Label:
Gal
Unit Size:
Note:
Gate Consumetl Receivetl
Cum Consumed Cum Received
Cum Returned Cum On Loc Note
11242010 198.0 190.0
lazing
5,742.0
5,]42.0
0.0
0.0
Supply Posner Desclpapn: WIF Injected Diesel
Umt Label:
Gal
Unit Size:
Note:
pile Consumetl Receivetl
Returned
Cum Consumed Cum Received
Cum Returrred Cum On Loc Note
112&2018 4200 4200
115500
11,550.0
0.0
0.0
Last Authority Visit
Dare TO ins,. Nor
Total I.N.C. number Lomment
112712010
BOP Test, AOGCC left Jones witnessed
BOP test, nand test due IM42018
STOP Cards Submitted
Co."
0 Rpte
cpm
Doyon Dulling
3
PJSM'S
Doyon Dolling Inc.
3
HRWS
Doyon Drilling Inc.
11
Safe Cams
Doyon Dulling Inc.
3
COW
MI Near.
4
HARCIJSA
MI Swaco
4
RIR'.
General Notes
canmenD
Well Name:S-FN7 OR
Wellbore Name: e: SP05-FNFN7
Well Code: 26944
Job: WORKOVER
en i WCER Level:
Daily Report
Date: 1112912018
Report #: 31
Page: 1 of 3
Well Header
PermitKancession N• Operator
Subsidiary Initlal LeM1ee Cotler
AL45KA ENI PETROLEUM
ENI Petmleum Co. Inc. DEVELOPMENT WELL
Rotary Table Elevaton R) Water Depth(N)
First Fling. (ft) RKB - Base F,.ng-M RKB- Tubing Spool @)
5362 0.00
16.97 36.65 31.74
Rigs
Rig Name Contractor
Cog Type Rlg Num Rig Bkrt Date Rig Release Date
RIG 15 DOYON
LAND RIG W23 12/251201]
Daily Information
Weather Temperature (-FI
Wind Days LTI (days) Days RI (Bays) POB
Overcast WC -30° .,0
NE®20 MPH 367.00 36]00 89.0
Safety Incidents - Near Miss
Date Category Type
Subtype Severity Cause Lost time?
Comment
Safety Drills
Days Untll Next Check
Type
0occur Last Data
Next Dam
(daysI
Authority Visit
3 1127/2018
121442018
5
Fire Drill
6 11/142018
112812018
-1
Kick While Tripping
2 111282018
11292018
0
Kick While Tripping Drill
3 11192018
11/122018
-17
Man Down Nit
1 11122018
113112019
63
Rig Inspection
31 112&2018
1113012018
1
Sakti Meeting
31 111292018
11J 018
I
Spill Dell
4 11/172018
12/12018
2
TT ROPE DNI
1 111752018
11292018
0
TT Oimder DNI
i 1141842010
51172019
169
TT H2S DNI
3 1111=018
2/812019
71
TT ka While drilling
2 11272018
112812018
-1
TT nck While Tripping
2 11/112018
11/122018
-17
TT Man Down DNI
4 112612018
11272018
-2
TT Rig Evacuation Drill
2 1102010
262019
69
TT Spvl Drill
1 112512018
12 018
10
IT Stripping tlnll
2 11/13/2018
W1112019
14
TT Well Kill DNI
1 11O/2018
21512019 1
68
Casings seat
Cas. Type
I Do (in)
I IO(in)
I Grade
I Too(ftKB)
I Bo. Marti)
I TVD ROL(hKR) Run Date
CONDUCTOR
160.0
ifi0.0 11111
CASING
13318
1242
L-80
-0.1
3.909.0
2,4525 1]!192012
CASING
958
884
L-80
0.1
11.9890
3,995.0 12!302012
LINER
512
4.95
L-80
11,771.0
20,6750
3,901.0 11172013
LINER
312
20,616.6
20,67!.0
3,901.4 SrJl2D14
Last Cementing
Cementing Start Date: 51712014 String: LINER, 20,673A1K6
Comment 3,S X SS liner hanger/ packer set inside 5.9 liner. TO liner ® 20.618', arm of float shoe @ 20,673'.
St, N Top (111,13)
Top Meas Meet
Stan (Me)
Co.
1 20.8160
20,8 .D
LB Test area to3600 psi. SLB pump 25 bbls 10Ed MWPush, 25 bbls 15 Bk cement, drop 5" wiper ball, 15 bbls
10 W MudPush and ng dl.0l . cal 184 bbl. slkk watn. Sting Into liner packer and ethane cement w143 bbls d slick
water CIP @ 1010 him
Job Information
Jab Phase Plennetl 8krt Dale
Start Daie End Date PSO Duration (days)
WORKOVER 10/30201815:00
10/30201818:00 0.0D
Daily Summary Operations
24h Forecast
Finish ESP cable splirs. Continue to ren ESP in hole and and out. Test hanger void. Nipple down BOP and Nipple up an, Passwn kat.
Zan Summery
Make ESP electrical splice and test lines. Run in hale with ESP On 4.5' Hyd 583 F/1,275' T2480. Install X -O pup and pick up HYD 521 ren In has F2.480' Tn,330. Changed out both spools, pumping 10 bbls
per hour Inner down well and IesOng Ines. Pumping tubing volume every 3,000,
Operation at 07.00
Run in how, with ESP @ 8.851'
Time Log
Start End Cum our
Time Time Nit (hit) (MI phase Opr. Act
Plan Ope, ones.
00:00 0300 3.00 300 W . K 4
P Continue to ren in hole with ESP auembly on 4V Hyd 563 F11,275' 72,475'. Testing Imes every 10W'. No resliictiom, tlmg
-750
orweighl stick up when running through casing Patch at 2,264.5' 1a 2,2845. Contlen to pump in hole 10 apt, no retems.
0300 07:30 4,50 W,O. K 4
P Make up X-0 pup, 521 x 583. Change out elevators. Continue to rue completion in hale Picking up HYD 521 pints F2.475'
TIM00'.
SIM OPS: TmubleaMol spooling unit reel Makes.
07.30 08:00 0.50 L00 wo K 9
P Rig up and pump a tubing volume (47 bots) a126 bpm. 750 psi.
0800 1130 3.50 11.50 W.O. 4
P .Mime to ren in hole with 4 5' 521 HYO cam eon 4 4.484' PB017 Testing inns every 1900- Pumping 0 ph 9.
ppg brine down annulus.
1130 13:00 1.50 1360 W-0-7--yo-7-
Change out cap tube spool and test. Pumping 10 hi of 96 ppg brine down annulus,
1300 1890 SOD 18.00 W,O. K 4
P Continuer to run in hole with 4.5' 521 HYD ESP completion FI 4,484TM 017 Testing lines every 1000. PomPkg 10 bph 9 6
PPg been, dawn annulus,
18:00 1.0019.00 W.O. K
P umP k ring mlvme o able with 9 6 ppg rms at 10 g>m with 1000 I, lentpa cep ne antl cable while pumping.. hmgng
19 bph 9.8 PPg Inn¢ down annulus19:00
2.002100 W.O. 4
P Continue to ren in hale with 45' 521 HYO ESP wmple6 F1 EDIT T17,100' Testing lines every 1000' Pumping 10 bph 96ppg
trine down annulus,
21:00 1 502250W.OK20P
E
Chafeout ESPcable spools aMcmp¢nits2230
0. 02300 O.K 4
P runecerun inhale holewith4.5' 521 HYD E e do I ) 00' T17,330 tomomu ropedcable Ihmu,halma es
antl to ng floor la make splke2300
1002400 W.O. K 20
P Startskung ESP.lectmed.le with ENIGas
R
Avg Background Gas 1%)
Max Background Gas (%)qv9
Connection Gas (%I Max Connection Gas (A)
Avg DNII Gu (%)
Max one Gas (%)
Avg Trip Gas (%) Max Trip Gas (%)
Well Name: SP05-FN7 OR
Wellbore Name: SP05-FN7
Well Code: 26944
Job: WORKOVER
WCER Level:
Daily Report
Date: 1112 9/2 01 8
Report #: 31
Page: 2 of 3
Daily Mud Volumes
TanklAddiXonaoss
Type
Des
Volume (hot)
Tank
gdive
Pits
Hole
Hole
Loss
Formation
Cumulative Mud Volumes
Active Volume (1,10)Hale Volume (bbl) Addittens (bbl)
Cum
Additions(bM) l.gsaea (bbl) Co. Losses (bbl)
0.0 0.0
0.0
0,0
0.0
1,094.9
Daily Contacts
Position
Contact Name
Company
Tilde
Ercall
Office
Mobile
Ent replesentaive
Bruce Si..homn
Ent
DnNng Supv,
sUdr11inggen1pmr010Um mm
907885-0715
Eni representative
Mike Gmbh
Eni
Drilling Supv.
ouldridng@mtpetroleum:um
907805-0715
Eni representative
Wade Thomas
Ent
Rig Clerk
AKRtgClmksOoyonl 5®empelmleum.
907$35-0722
Ent representative
David Leonam
End
HSE
Ent representative
Mad Hubler
Eni
HSE
Drilling SupL
Sam Dye
Dutch Drilling
Field Superintendent
Tod%an
Julian Hays
Doyen Drilling
Tool Pusher
r05CtloymldtlAln,cam
Tool Push
Ted Kruger
Doyon Drilling
Tour Pusher
rigl5@doyondrilltng.com
908850716
Tool Push
CIMG.vene
Doyon Drilling
HSE
ensQmatom illing.com
635-0796
Tool Push
SroUSimmons
Doyon Drilling
HSE
Personnel Log (POB)
Company
Sam. Type
Work Him)
Stand-by H(hr)
Could
Note,
chumbeger
Wtreltne
12.50
0
Drilling
ASPIC
Company Man
1250
1
Drilling
ASRC
Ged
1250
1
Drilling
ASPIC
SOA
12.50
1
SID Support
ASPIC
Crone Advisor
12.50
1
SID Support
Beacon
Medic
12.50
1
SID Support
Doyon
FieldSupetlnlendent
12.50
1
lnding
Northern 011fetld S..
Prater
12.50
1
SIDSWpOn
Veto Cray
Wellhead Service
12.50
1
Drilling
ACS
Emhormntal
1250
2
SID Support
Beacon
HSE
12.50
2
SID Support
Doyon
Tcolpushen
12.50
2
Dulling
Doyon
HSE
12.50
2
Dulling
H.Uhlar ten
Mud Loggers
12.50
2
Drilling
Little Red
Pumping
12.50
2
Driving
MI S.U.
Mud Plant
12.50
2
Drying
GSR
Casing Service
12.50
3
Drilling
Halliburton
SludFra,
12.50
3
Drilling
ASRC
-'rime
12.50
4
SIDSupport
Ml Swaco
WIF
12.50
4
SIDSuppod
Bake,
Fishilg I Packers l Centiiltk
12.50
5
Drilling
Purcell
Security
12.50
5
SID Su on
ESS
Causing
12.50
10
SID Support
Jamba
Truck drum l Crena operator
1250
11
Drilling
I
Doyon
Rg Personnel
12.50
22
Dr ling_Tolal DriOng Personnel 55
BOP Sfac 8 Components
Oescrlp0on
smn Data Las[ Certification Date Prezame Ratio,("")
Type
Make Nortel
ID Near
PRange (psi
Last can Date
Slow Circulation Rates
Pump Number: Make:
Mctlel:
start Data End Date
Liner Site lin)
Volume Per Stroke override(bbllsd) Max Pressure (psi)
Data Depth(mog
So. Spd
Stakes(spm)
P(par) I
Ell I%)
I OFl. (9pm)
Daily Bulk
Supply learn Description: Equipment Fuel
UNttabel: Gal
Unit Size: 1
NON:
Data ConsumetlReceivetl
Returnetl Cum Conaumetl Cum Received
Cum ReNmed Lum On Loc
Note
112912016 193 )0 19370
42,215.0
42,2150
0.0 00
BvpP lean 0¢a[ripit Mud Plant Boilers
Unit labH:
Gal
Unit St.. :
Note:
Date Conaumetl Received
Returned
Cum Consumed Cum Received
Cum ReNmed Cum On Loc
Nota
11292010 42.0 42.0
1,26841
1,260.0
0.0 OD
Supply lean D Hpum: Rig Feel
Unit Label:
gal US
Unit Size: 1
Note:
Date Consumetl Received
Returned
Cum Consumed! Cum Received
Gum Returned Cum On Loc
Note
1129/2010 2.4270 0.0
59,794.0
55,271,0
0.0 -0.5230
supply Son, Description: Rg Water
Unit Label:
bbl
Umfsize:I
Note:
Dah Lonsumetl Received
gummed
Cum Consume" Cum Receivetl
Cum Returned Cum On Loc
Note
11292018 21.0 0.0
1313.0
1513
0.0 195.0
Supply Iften ripXon: WIF Boilers
unit label:
Gel
Unit Size:
Note:
Date Consumetl Received
Returned
Cum Conaumetl Cu. Received
Cum Returned Cum Go Lo[
Note
11292018 198.0 1980
5,940.0
5,9480
80 0.0
Supply Sem Description: WIF Injected Diesel
Unff Label:
Gal
Unit Size:
Note:
Dale COnsumetl Received
Returnetl
Cu. Consumed Cum Receivetl
Cum Returned tum On Loc
Hole
11292018 420.0 4200
11.9]00
11,970.0
0.0 DO
Last Autbonty Visit
Date Tot insp. Nb
Total I.N.C. number Comment
11272018
BOP Test, AOGCC Jeff Jones witnessed
OOP test, next lest due 12/042018
STOP Cards Submitted
Company
at Rpta
Co.
Doyon Dalkon6
PJSM'S
Doyon Drilling Inc.
6
HRWS
Doyon DnlNng Inc.
13
Safe Cams
TOW
Doyon Ddlkng Inc.
Well Name: SP05-FN7 OR
Wellbore Name: SP05-FN7
Well Code: 26944
Job: WORKOVER
WCER Level:
Daily Report
Date: 11129/2018
Report #: 31
Page: 3 of 3
STOP Cards Submitted
Company R Rpte
Com
Ml Swaco 4
MI Swaco 4
1 HARC/JSA
RIR'a
General Notes
Comment:
Well Name: S7 OR
Wellbore Name: e: SP0SP05-FNFN7
Well Code: 26944
a'a Job: WORKOVER
n II WCER Level:
Daily Report
Date: 1113012018
Report #: 32
Page: 1 of 2
Well Header
PermitlConcecslon N° Operener
Subsidiary Initial LaM1ee Cotle
ALASHA ENI PETROLEUM ENI Pateeleum Co. Inc. DEVELOPMENT WELL
Rotary Table Elevation (M Water am VII
Fired Flange(R) RK8-Base Flange in) RKB-Tubing Spool(h)
5362 0.00
1697 W65 31.74
I
Rigs
Rig Name Cgntrector
Rig Type Rig Num Rig Start Date Rig Release Date
RIG 15 DDYON
LAND RIG 0723 12/252017
Daily Information
WeatherTempe®ture PF) Wind Days LTI(days) Days RI (days) Poe
Overcast WC -11° 104
NE @ 27 MPH 368.00 36600 a).0
Safety Incidents - Near Miss
Data Category Type Subtype Severity Cause Lost time?
Comment
Safety Drills
Days Unel Next Check
T pe
# Occur
Last Data
Next Date
(days)
Ahmed, Visit
3
11/2712018
12/42010
4
Fire Will
6
11/1421118
11QW2018
-2
Kirk While Tipping
2
112812018
1112912018
-1
Kick While Tipping Ong
3
11152018
lViv 010
-18
Man Down 0611
1
1122018
1131/2019
62
Rig Inspection
32
11202018
12/112018
1
Safety Meeting
32
11/3012018
IVII2018
t
Spill Dal
4
11/1712018
12/12018
1
TT BOPE Dril
1
11/15/2018
11292018
-1
TT Diverter Dan
1
11/1812018
5/172019
168
TT WS Dril
3
11/102018
DW2019
70
TT Kick While drilling
2
11272018
112812018
-2
TT Kick While Tripping
2
111112018
11/12/2018
-18
TT Man Down Dull
5
11/302018
WWM19
90
TT Rig Evacuation Dell
2limbi8
21812019
68
TT Spill DTII
1
11252018
12/92010
9
TT Shipping poll
211/132018
2/11/2019
73
TT Well Kill Drill
1
1IM2010
VS12019
67
Casings seat
Cas. Type
OD (in)
ID (in)
Drops
To,(kKB)
am.(KKs)
I TVD Bank (final
I Run Data
CONDUCTOR
"0'
160.0
1/1201
CASING
13318
1242
LA0
0.1
3.909.0
2,452.5
12/192012
CASING
95/8
8.84
LA0
1
0.1
1
11.889.0
3,995.0
1MM012
ISWO14
LINER
512
4.95
L40
117710
20,8750
3,901.0
Vl72013
LINER
3112
20,6166
20.673.0
3,901.4
Last Cementing
Cementing Start Date: 522014 String: LINER, 20,613,010%
Comment: 35- X 5.5" liner hangerl packer set inside 5.5- liner, TO liner @ 20,618'. Mm of Mat shoe @ 20,673-
s
Stg # Top RKB)
Top Meas Meth
Bhn IRKBI
I Cam
1 206180
20,673 0
SLB Taal lines to 3500 be SLB pump 25 rads 10.54 MudPui 25 me 15 Bb cement deep S wiper ball, 15 the
10.5# MudPush and rig displace wl 184 bidsslick water. Sling into liner packer and squeeze cement as' 43 bbls of slick
I
water. CIP @ 1010 has.
Job Information
Job Phase Pla Dane
Start Date End DM P50 Duvtion 14'.)WORKOVER
'S.M'rt
1020201018:00
10130201818:00 000
Daily Summary Opearavons
24h Forecast
Finish nipple down BOP stock, test ESP debts. Nippk up Tree and perform passport lest.
2411 Summary
Finish ESP cable splice. Continue to run ESP in hole and land out. Taal huger void. Nippling down BOP
Operation at Drop
Fee spod Testing
Time Log
Start End Cum Our
Time Time Do, (hit) fill Phaco OF, Act Plan Oper. Deecr.
woo 0300 3.00 3.81 WO. 20
P Continue to splice ESP electrical cable and test.
03:00 06.30 3.50 650 W O. K 4
P Continue to ran In hold with ESP assembly on HYD 521 11 6 mf L-80 FIT nO T19,030'. Pumping 10 able Per hour 96 ppg
bane every hour with no returns. Test cap fine anti cable every 1000
0630 0730 1.00 >5[) W O. K 9
P Start pump tubing volume with 102 gond at 1000 psi, at 126 bats away we had aeWms to surface and stopped pumping.
SO -65 k
0730 1100 3.50 11.00 W O. K 4
P Canters to ran in hole F/9030TI10.061 Make up X -O pup and tubing hanger win lending kind Pumping 10 bpi of 9.6 ppg
Mine every hour.
11.00 14:30 3 EO 14.50 W.O. 20
P Test eat teeninane cap and cai. install penelratdn Splice ESP cable at Wbing hanger. Pressure teat rap Nae and test ESP
line at penetrator.
1430 1630 200 1650 W.O. K 4
P Run in hole with tubing hanger and land out at 10.106' wind 80E2K. Run In ask down screws. Test Vold to for 10 minutes
good resp
16:30 1800 1 SO 1800—W-7— .20
P ken and clear Bopr GBR equipment anti Baker goal and equipment Pull landing joint and lay down. Lay desire cap line
end ESP cable horn sheaves. Lay down Sheaves.
1800 00'.00 800 24 00 W. C 1
oey pressure. Vacuum out t of stack. Remove drip guards around
P Blow down choke, M#, hone ml lino and shoed an kom
neer. Remove choke and MI hoses horn stork. remove hydraulic and manual choke valva assemblies tram slack
Gas Readings
Avg Background Gas (%)
Max Background Gas 1%1
Avg Connxlion Gas 1%7
Max Connection Gas (%)
Avg Drill Gas 1%1
Max will Gas (%)
Avg Trio Gas (%)
Max Trip Gas (%)
Daily Mud Volumes
TanklAmitioNLoss
Type
Des
Volume (bb)
TankgcTive
Pik
Hole
Hot.
Lear
mat
Formation
Well Name: SP05-FN7 OR
Wellbore Name: SP05-FN7
Well Code: 26944
Job: WORKOVER
WCER Level:
Daily Report
Date: 11/3012018
Report At: 32
Page: 2 of 2
Cumulative Mud Volumes
Active Volume (bbl) HMe Volume Ibbll Addd U,;ns /bbl)
Cum Additions (1,M) Losses (bbl) Cum Losses (bbl)
0.0 o.D
D.0
Da 0.D
t,0s4s
Dairy Contacts
PositionContact
Name
Company
Title
Email
Office
Mobile
Enirepresenlat..
Brece Im.naon
Eni
Drilling Supv.
sidddllingglienlpetroleum.mm
907-605-0715
Enl representative
Mike Gmbh
Ent
Drilling Supv.
sidddllingi%anipNrde er,om
90]485-0]15
EM reprosenmbve
Wade Thomas
Enl
Rig Clerk
AKRgClerksDo,mI5@enipetmleum.
907-6854722
com
Ent rNessemmWe
David Leon"
Eni
HSE
Ent representative
Meh Nobler
Ent
HSE
Dollar, Supt
Sam Dye
Doyen Dulling
Field Superintendent
Tool Push
Justin Hays
Doyon Drghm,
Taal Pusher
rigl6adsyondnllingcom
T.ol Push
Teri Kregp
Doyon Drilling
True Pusher
d915@d r,ondrflIN.0m
907-6050716
Tool Push
CIM Owens
Doyon Ddim,
HSE
cowenst%hiM dnlling com
685-0795
Tool Pu"
Scott Simmons
Doyon Drilling
HSE
Personnel Log (POB)
Company
Sam, Type
Work IN (hr)
Stand-by H(hr)
Court
Nob
[Mumbetger
Wireline
12.50
0
Dolling
ASRC
Company Man
12.50
1
DMling
ASRC
Cent
12.50
1
Drilling
ASRC
SOA
12.50
1
SID Support
ASRC
Crane Advisor
12.50
1
SID Support
Beacon
Medic
12.50
1
SID Support
Doyon
Field Supemtendent
12.50
1
Drilling
Northern Oilfeild Services
Feeler
12.50
1
SIDSuppotl
ACS
Environmental
12.50
2
SID Support
Beacon
HSE
12.50
2
SID Support
Dayan
Taol pushers
12.50
2
Drilling
Doyon
HSE
12.50
2
Dosing
Halliburton
Mud Loggers
12.50
2
DtlAmg
MI Swam
Mud Plane
12.50
2
Drilling
Vet. Gray
Wellhead Service
12.50
2
Drilling
GBR
Casing Sem.
12.50
3
Drilling
Halliburtmm
Sicpina
12.50
3
DMling
little Red
Pumping
12.50
3
DMling
ASRC
Logistic
12.50
4
SID Support
Baker
Fishing l Paden l Camels
12.50
4
DEllitg
Ml Swam
WIF
12.50
4
SID Support
Purcell
Secumy12.50
5
SID Support
ESS
C tmng
52.50
10
SID Support
Jacobs
Tmd dmmr I Crane .,.is,
12.50
11
1
Drug,
Doyon
Rig Personnel
12.50
22
Dolling Total Drilling Personnel 56
BOP Stack 8 Components
Description
Btart Daps Last C.Nticaoon Data Pressure Rating (poll
Type Make Model
ID Nom(inl
ft,h
I Last Con Date
Slow Circulation Rates
Pump Number: Make:
Motlel:
Start Doh Entl Date
Liner Sin (in) Volume Par Stroke Override (bblm6:) Max Pressure (pai)
Date Depp IKKBI
Slow Sptl
Strokes (spm) I
Flow (,Um)
Daily Bulk
Supplylmm0eamiptlen: Equipment Fuel
UnItLabal:
Gal
Unit Size: t N.W
Doh Cons,mnd Receivetl
Remrnetl
Lum Consumetl Cum ReceWetl Cum Relumetl Co. On Lee
Note
11902018 1;32.0 1.]32.0
43,94].0
43,94)0
Suppylbm consNptlm: Mutl pant Boilers
that Label:
Gal
Unit Size: Note:
Date Consumetl Recelvetl
Returned Cum Consumed Cum Received Cum Returned Cum On Loc
Note
11/30/2018 42.0 42.0
1,3020
LJ020 0.0 0.0
Suppy Ilam Oeaetlptlon: Poe Fuel
unR Lahel:
gal us
Unit Size: 1 Note:
Dam Consumed Rmeivetl
Returned
Cum Consumetl Cum Remi Co. Returned Co. On Loc
Note
11902018 2.4J8.0 8.022.0
62,232.0
63,293.0 11.0 1,061.0
Supply Item Dncriptlsn: Rig Walter
Unit label:
bet
unit Size: 1 Note:
Date C.neumed Receivetl
Returned Cum Consumed Cum Received Cum Returned Cum On Loa
Note
11902010 35.0 00
1.353.0
1,513.0 00 1800
SUPAY lDesulptlon; WIF ablers
unit Label:
Gal
Unit Size: Note:
Dale Consumed ReceWetl
Retwnetl
Cum Consumetl Cum Receivetl cum Returnetl Cum On Loc
Nom
11902018 1980 1980
6,138.0
6,1380 0.l 0.0
Suppy linin Oescnptlon: WIF lnjedad
Diesel
Utdt Label:
Gal
Unit Size: Note:
Dam Cmaumed
Recelvetl
Remrnm
Cum Consumetl Cum Received Cum Returned Cum On Lac
Note
11902018 420.0
420.0
12,390.0
12.390.0 00 00
Last Authority Visit
Dan TM ins,. Nb, Total I.N.C. number CBOPommenTt
11272010
est, AOGCC Jeff Janes wItmv ed BOP test, next lest due 12/04/2018
STOP Cards Submitted
Cam"
0 Ron
Com
Doyon Drilling
8
S
Doyon Drilling Inc.
8
HRWS
Doyon DMling Inc.
0
cow
Doyon Drilling ln.
5
Sam Cams
MI Svaco
4
H RCIJSA
Ml Swam
4
RIRS
General Notes
Comment:
Well Name:S-FN7 OR
Wellbore Name: e: SPOS-FNFN7
Well Code: 26944
Job: WORKOVER
ani WCER Level:
Daily Report
Date: 1211/2018
Report #: 33
Page: 1 of 3
Well Header
PermiVCmcession N• Operator
Subsidiary Initial Lahey Code
ALASKA ENI PETROLEUM ENI Petroleum Co. Inc. DEVELOPMENT WELL
Rotary Table Elevation lXl at., Coal (a)
Fest Flange(a) RKS -Sas. Flang. to) RKB-Tubing Spot lftl
5362 000
16.97 36,65 31]4
Rigs
Rig Name Contractor
we Type Rig Num Rig Sort Date Rig Release Data
RIG 15 DOYON
LAND RIG 0723 12125201]
Daily Information
Weather Temperature l°F) Wind Days LIN(days)Days RI (days) FOR
Cloudy 140
SE@17 MPH 369.00 36900 90.0
Safety Incidents - Near Miss
Date Category Type Subtype Severity Cause Lost time?
Comment
Safety Drills
Days Until Neat Check
Type
#Occur
Last Data
Near Date
(daysl
Authority Ys4
3 11/272010
12/42018
3
Fire bull
7 12/12018
12/1612018
14
Kick While Tripping
2 112&2018
114HY x18
-2
Kick While Tripping Drill
3 11IN2018
1111 VM18
-19
Man Down Drill
1 112/2018
1/312019
61
Rig Inspection
33 12/12018
1222018
1
Safety Memirg
33 12/12018
1=018
1
Spill Drill
4 11/172010
12/12018
0
TT SORE 001
1 11/152018
1129/2018
-2
TT Orveter bull
1 111IW2018
5/1712019
167
TT H2S Drill
3 111IW2018
2/8`2019
69
TT Kee While drAin9
2 1127/2018
11282018
-3
TT Kick While Trygin9
2 11/11/2018
11/12/2018
-19
TT Man Down Drill
511/30/2010
2282019
89
TT Rig Evacuation Doll
3 12/12018
3/12019
90
TT Spill Nil
1 112512018
12912018
B
TT Slurping drill
2 1111312018
2/1112019
72
TT Well Kill N11
I ila
m18
2/512019 1
fib
Casings seat
Cas. Type
Gods)
to (in)
Ends
Top(ftKB)
Bottom(RKB)
TW S.L(ftKR)
Run Data
CONDO OR
t 0
160.0
1/12011
CASING
13310
1242
480
-0.1
3,809.0
2,4525
12/1912012
CASING
9518
884
L-60
0.1
11,9880
9,995.0
iT/31N4012
LINER
512
496
400
11771.0
20,8]6.0
3,9010
1/17/2013
LINER
31,2
20.618.8
20,6]1.0
3,901A
5`32014
Last Cementing
Cementing Shirt Date: W12014 String: LINER. 20.6730nKe
Cerement 3.5" X 5.5" liner hanger/ packer set inside 5 5" liner. TO finer @ 20,616. bum offset shoe @ 20673'.
Big p
Top(ftKB) Top Meas Mein
Ban(ftKBl
Cern
1
2x618.0
20,813.0
SLB Tesl lines to 3500'9l. SLB pump 25 looks 10.50 MudPush, 25 bola 15.8# cement, tlro' 5' wiper ball. 15 the
10.50 MudPush and rig displace w/ 184 bbls slick water. Sling into liner packer and adheres cement wl43 bbls of slick
water. CIP @ 1010 hrs.
Job Information
Job Phar. Planned Start Data
Shirt Dab End Data PW Duration (dayal
WORKOVER 10Y=01818:00
10I30I201818:00 000
Daily Summary Operations
Zen Forecast
Finish cleaning pita.Prepere and move pit system for across to was line work on SP10.
24h Summary
Finish nipple down BOP stack, teal ESP cable. Instill tree and passport cast. Cleaning pee and prepare for pit module move.
Operation at 07.00
Cleaning pits and prepare for pit module move.
Time Log
Start End
Cum our
Time Time
our lar)
@n
Phase
Do,.
Act
Plan
O'e, Desc,
0000 0330
3.50
3.50
W.O.
K
5
P
Construe brig down BOP area Remove Valve assembty and unbolt Shia. Remove riser. Clean and prepare for tree
installation. Test ESP cable and Earnings cap lube to safe of well head.
03:30 1D30
700
10.50
Wo
K
20
P
Install tree and test Vold to 5000 psi ke 10 minutes (good test). Passport test 30(V3000 psi. Remove We way check valve and
secure tree. Rig clown test innateness, remove antiabr from 4g flow
1030 18:00
7.50
1000
W.O.
20
P
Empty and <bsnkg pits. Rig tlawn lines order rig Boar in preparation M skid favor. Prepare pit motlule move. Prepare
pump mom for mud pump 2 workref orm mance maintenance and MP2 work orders. Continue to prepare 69 floor for
skidding. Move sp xping unit to sagm, mea. Remove Gal -m niss and hoses hom well bay.
1800 0000
6.00
2400
W.O.
20
!=--
Cache. claming pits. R, down gas buster Demobs ace (ding arouptl summary hoal Has up hoses on kgomey unit or
trinsport. Pumping pits for moving. Install said braces an pipe shed. Cleanl" gear all pump and Removing high pressure
hoses and waves on #2 mud pump, General housekeeping.
Operation from 00:00 to 06:00
Start End
Cum Do,
Time Time
our(hr)
fin
Phase
1 011.
1 Act.
I Plan
Open Desc,
00'.00
1200
36.00
W .
A
1
P
Cleaning pits. Disconnect air and steam and air fmm pump #3 module. Ensure ar Ones are disconnected between sub bese
and mud pits. Check and air up tires for rig move. Prepare mud pump 42 for removal to remove bull gear. Reconfigure spiral
112,W
1
wap m top dive service loop. Rig down electrical for generator #5 and mud pump #3 module. Welder replacing egthoer
brace for mud pump#2 antl rebuiltl gun line for pit At Disconnect electrical for Mud pump #2, unplug VFD house cables M
lop clave.
Gas Readings
Avg Background Gas 1%)
Max Background Gas (%1
Avg Connection Gas 1°hl Ms. Connection Gea (Y.)
Avg 0NI1 Gas (%1
Max DHII Gas (%)
Avg TOp Gas (%) Mas It" Gu 1%)
Daily Mud Volumes
TankfanddiVor#Lass
Type Des Volume (bb)
Tank
ecave Pits
Well Name: SP05-FN7 OR
Wellbore Name: SP05-FN7
Well Code: 26944
Job: WORKOVER
WCER Level:
Daily Report
Date: 12/1/2018
Report #: 33
Page: 2 of 3
Daily Mud Volumes
TanloAtlOdion/Loss
Type
Des
Volumes(bbil
Hole
Hole
Loss
Fomlation
Cumulative Mud Volumes
APdve Volume (bbl) Hale Volume (hot) Addibons(bbl)
Cum Additions lbb0 Losses(bbl) Cum Lasses (bbl)
0.0 0.0
0.0
6 D
0.0
1.0949
Daily Contacts
position
Contact Name
Company
Title
Email
offs.
Mobile
Ent reprseentaUue
Bruce Sirporom
Ent
Drilling Supv
siddAlingl enipelrokumcom
907-6850715
End repirembeGva
Mike Grubb
Eni
Drilling Supv.
slddMliggQenipetmbum.wm
907685-0715
Ens representative
Wed. Thomas
Era
Rig Clerk
AKRIgOleftDoyonl 5®enipetmleum.
907685.0722
com
Eng represented.
David Leward
Era
HSE
Ent representative
Mary Hubler
Ent
HSE
Will Supt Sam
Dye
Doyon
Doling
Field Superintendent
Tool Push Justin
He,
Drying
Dtllling
Tool Pusher
rgl5iEltloyondmang com
Tool Push Ted
Kruger
onion
Cutting
Tour Pusher
rgl 5@doyodrtlling.com
9076850716
Tool Push chef
Owens
Doyon
Drilling
HSE
ensltlidoyrndnlling.com
685.0796
Tool Push Scott
Simmons
Doyon
Willa,
HSE
Personnel Log (POB)
Conn"
Sam. Type
Work H(bn
Strand -try H govt
Count
Noe
Schlumberger
Wireline
12.50
0
Wiling
ASRC
Company Man
12.50
1
OnIINg
ASRC
Clark
12.50
1
Drilling
ASRC
SOA
12.50
1
SID Support
ASRC
Crane Advisor
12.50
1
SID Suppod
Seamon
Medic
12.50
1
SID Support
Doyon
Feld Superintendent
1250
1
Ddling
Northern OAt ed Services
Pusher
12.50
1
SID Support
ACS
Emaamental
12.50
2
SIO Support
Baawn
HSE
12.0
2
SIO Support
Doyon
Tool "she.
12.50
2
Willing
Doyen
HSE
12.0
2
Drilling
Herliburton
Mud Loggers
12.0
2
Drilling
MI Svaw
Mud Pent
12.50
2
Drising
Valso Gray
Wellhead Service
12.50
2
Drilling
GSR
Casing Service
12.50
3
Driging
Herdsman
Slickltne
12.50
3
Udg'mg
Lille Red
Pumping
12.50
3
Willing
ASRC
Logistic
12.0
4
SID Support
Baker
Fishing l Program /Carvell
12.0
4
Drilling
Ml Swaw
Will
12.0
4
SID Support
Purcell
Security
12.50
5
SID Suppod
ESS
Catering
12.5010
SID Support
Jacobs
Truck driver) Crane operator
1250
11
Mling
Doyon
Rig Personnel
1250
22
Dnlltng_Toel Driving Personnel 56
BOP Stack 8 Components
Description
Start Date
Last Certification Date Preaaure Rating (Pat)
Type Make Model
ID Nom (in)
P Ranee (01)
Last Cart Data
Slow Circulation Rates
Pump Number: Makin:
Motlel:
Start DateEm Dan
Liner Sim(in)
Volume Per Stroke Override dbbilsfk) Ms. Pressure(oil
Date
Depth (Rea)
Slow Sod I
Stroke. (am)
I P (psi)
EN Tii r O Flow (gpm)
Daily Bulk
Supply Item Description: Equipment Fuel
Unit Lased:
Gat
Unit Sim: t
Note:
Doh Cogsumetl Receivetl
Returnetl
Lum Consumed
Cum Received
Cum Returned Cum On Loc
Noh
1VICN118 1 ]640 1 ]64.0
45.711.0
45,711.0
n.
00
Supply Item Dasedpi Mutl PlantBailers
Unit Lal l:
Gel
Unit Size:
Note:
Data Consumed Receivetl
Returned
Cum Consumed
cum Receivetl
cum entered On Lac
Note
tvt/2019 42.0 ago
1,3440
1.3440
00
Can
00
SUPPIY It Weaeriptlon: Rig Fuel
War Label:
gal us
Unit Size: 1
Note:
Date Consumed Receivetl
Returned
Cum Consumed
Cum Received
Co. Returned cum On Loc
Note
12/1/201a 2.071.0 0.0
64.303.0
63,293.0
00
-1,010.0
Supply Imm Description: Rig Water
Un. Label:
bol
and Sze: 1
Noce:
Date Consumetl RweWetl
RNurnetl Cum Consumed
Cum Received
Cum Returned cum Cin Loc
Note
12/12018 113.0 1350
11,465.0
1.648.0
0.0
102.0
Supply Nern oeseid. WIF Rollers
Unit Label: Gai
Unit Size:
Note:
Daft Ccreated Received
Remmetl Cum Consumed
Co. Re..Wetl
Cum Farm." Cu. on Loc
Note
12/12018 1980 1960
6,336.0
6,3360
00
0.0
Supply learn DesMptlon: WIF Injected
Diesel
Urdt Lanai Gal
Unit Size:
Note:
rah Consumetl
Received
Returned Cum Consumetl
Cum Received
Cum Returned Cum On Lou
Note
1212018 420.0
420.0
12,610.0
12,010.0
0.0
00
Last Authonly Visit
Dace Tot map. Nor
Total I.N.C. number Comment
112L2018
BOP Tast, AOGCC Jeff Jones witnessed
BOP test, nem test tlue 12/042018
TOP Cards SNnmitted
Company
eaph
com
Doyon Drilling
6
PJSM'S
Doyon Grain, Inc.
6
HRWS
Doyon Dilling Inc.
6
COW
Doyen Wilting Inc.
13
Safe Cards
Ml Seaw
4
HARC/JSA
Well Name: SP05-FN7 OR
Wellbore Name: SP05-FN7
Well Code: 26944
Job: WORKOVER
WCER Level:
Daily Report
Date: 12/1/2018
Report M 33
Page: 3 of 3
STOP Cards Submitted
Company p Rpft Com
MI Swaco 6 RIR's
General Notes
eummaoe
Well Name: S7 OR
Wellbore Name: e: SP0SP05-FNFN7
Well Code: 26944
r� e'e Job: WORKOVER
krill WCER Level:
Daily Report
Date: 1212/2018
Report 1 34
Page: 1 of 2
Well Header
PermitiConcession N° Operator
SUWI01ary Ini8al"hee Cape
ALASKA ENI PETROLEUM
ENI Pebofeum Co. Inc. DEVELOPMENT WELL
Rotary Table Dai atlon(N) watermmi.)Fire[Flaage
lh) NKB - Base Flange (R) RKB- Tubing P.. to)
5362 0 D
18.9] 3665 31.74
Rigs
Rlg Name connector
Rig Type Rig Nom Rig Start Date Rig Release Date
RIG 15 DDYCN
LAND RIG 0723 122002017
Daily Information
Weather Temperature pP) Wind Days LID (days) Days a(days) POB
Gaudy 17.6
E®23 MPH 370.00 3]000 84.0
Safety Incidents - Near Miss
UMe Category Type Subtype Severity Cause Lost timet
Comment
Safety Drills
Days Until Next Check
Type
90ccur
Last Data
Next Date
(do")
Aumonty Visit
3
112720t8
12/412018
2
Fire Davit
7
12/12018
1211512018
13
Kik White To,,,
2
11282018
11292018
3
Kick White Tripping Call
3
1152010
11/12/2018
-20
Man Down Call
1
11=010
1212019
60
Rig Inspection
N
1212/2018
12/32018
1
Safety Meeting
34
12/2/2018
IDWO18
1
Spill Drill
5
1222018
12/161
14
TT ROPE Dn0
1
11/1512818
11292018
-3
TT Diverter Drill
1
11/18/2018
W1712019
166
TT HUS Call
3
11/102018
VM019
68
TT Kick While drilling
2
11272018
11282(318
4
TT Kick While Tripping
2
11/112010
11/12/2018
-20
TT Man Dawn Drill
6
1222018
322019
90
TT Rig Evacuation Drill
3
12/12018
3112019
89
TT Spill Oral
1
11r252018
12/92018
7
TT stripping drift
2
11IMM18
911/2019
71
TT Well KN D411
1
linimis
2/512019
65
Casings seat
Cas. Type
I DD (in)
ID(in)
Grade
Top INKS)
Bpttpm(kKB)
TVD Bot.(tKB)
I Run bare
CONDUCTOR
160.0
160.0
1/12011
CASING
13 318
1242
L-6)
-0.1
3.909.11
2,452.5
12/192012
CASING
9518
684
L-80
0.1
11,909.0
3,9950
12202012
LINER
512
495
li
11,7710
20.875.0
3,901.0
1/172013
LINER
312
20.616.6
20,673.0
3,901.d
513/2014
Last Cementing
Cementing Start Date: Wallis Stang: DNER. 20,6730 KS
Comment 3h X 55" liner hanged packer sal Inside 5.5" liner. TO linei 20.618'. bum of float shoo® 20,673'.
Big# TopfftKEH
Top Meas Meth
Ban (MB)
j Com
1 20,61.
20,0039
31-8 Test lines to 3500 psi. SLB pump 25 club 10.SPush ay Mud25 bbls 15 Bay cement, drop 9 wiper on, 15 beb
10.W MudPush and dg displace wl 104 Wls stick water. Shing into liner packer am squeexe cement w143 Ws of slick
water. LIP ®1010 his.
Job Information
Jab Phase Planned Start Date
Shirt Dale End Data P50 Ouranon (do,)
WORKOVER 1a3grzola 1e:oo
10/30201818:00 0.00
ally zamingary Operations
24h Forecast
Continue to no down. Prepare pad ter liner and mat board by out ter dg move. Continue to prepare pump ay2 ter removal
24h Summary
Rig down pump ay3 and move M staging area. Clean pits and move pit
system down wall row far access m wnrebne work an SP10. Continue rig down lines and equpment, Prepare pump 02 ter removal.
Operation at 07.80
Prepare for rig move.
Time Log
said
end
Co. Dur
Time
Time
Do, fln)
(hi)
Phase
Oar.
Act
plan
Doer. Deser.
00:00
12:00
12.00
12.00
W.O.
A
1
P
Cleaning pits. Reconnect air and seam and air hoe Pump ay3 module. Ensure all lines was disconnected between sub have
and mud pita. Check and air up tires far rig move, Prepare mud pump ay2 for removal to remove bull gear Bacardi spiral
wrap on tap drive service loop. Rig down electrical far generator p5 and mud pump N module. Welder replacing equalizer
brace for mud Pump h2 and rebuild gun lire for pit a'2. Disconnect electrical fair Mud pump Al on" VFD house refuse for
top dove.
1290
00:00
12.00
24,W
W.O
A
1
P
CanBnue to prepare ay2 and g3 moo Pump and pit module for move. Suck out cutbacks flow, Blow down steam and water linea
Vacuum out water tank and pit dose fluids. Rig down power between sub, plot and shop. DIS out snow around have, of ails
antl walkways. Clear pad M of, mat byout for move also set up matte. Move pit module the well mw. Sold scafbkdiN in
BOP deck for installellon of pad eyes.
Gas Readings
Avg Background Gas (%)
Max Background Gas (%)
Avg Connection Gas (%l, Max Connection Gas (%)
Avg Drill Gas (%)
Max Drill Gas (%)
Avg Trip Gas I%) Max Trip Gas (%)
Daily Mud Volumes
TankuddhbN1-oas
Type
Des Volume (Wp
Tank
A[Ilve Pits
Hole
Hole
Loss
Formation
Cumulative Mud Volumes
Active Volume (bid) Hole Volume (bbl)
Addldona (hal)Cum Additions ball, Losses (bap Cum Losses (bbl)
C.0
0.0 0.0
0.0 0.0 1,094.9
Daily Contacts
Peahen Contact Name
Company Title Email DNice Mobile
Eni reprasenlatNa Boom Simonson lich, 1 Drilling Sup¢ sia nsingQenipelroomm.com 907b85-0715
Well Name: SP05-FN7 OR
Wellbore Name: SP05-FN7
Well Code: 26944
Job: WORKOVER
WCER Level:
Daily Report
Date: 12/2/2018
Report R: 34
Page: 2 of 2
Daily Contacts
Position
Contact Name
Company
TIU.
Email
Office
Mobile
Ent represanbtrva
Mike Gmbh
n
WIIIing Sups
sitlddlling@Bnipetroleum com
907-665-W I5
Em representmtve
Wade Thomas
em
RG Clerk
AKRtgClerldsDopril5 @enipetroleum.
90]-665-0]22
mm
Ent representative
David Leonard
Era
HSE
Eni representative
Mark Hubler
Ent
HSE
Drilling Bust.
Sam Dye
Doyon Drilling
Field Superintendent
Tool Push
Justin Wys
Doyon Drilling
Tool Pusher
r1gl5@doyOntlnl1ing.com
Tool Push
Ryan Panlvztz
Doyon Drilling
Tour Pusher
dgl5@doyondn1hng com
Toni Push
Cliff Ovbne
Doyon Drilling
HSE
wens@doyond011ing.com
6050796
Tool Push
Said Simmons
Doyon Drilling
HSE
Personnel Log (POB)
Company
Sarv.Ty,
Work Hthr)
Stand-by H(hr)
Count
Note
Baker
Fishing l Peckers l Cenulid
12.50
0
Drilling
schlumheryar
WIKIIne
12.50
o
Drilling
ASRC
Company Man
12.a)
1
Drilling
ASRC
Clerk
12.60
1
Drilling
ASRC
SOA
1250
1
SIDSUppon
ASRC
Crane Advisor
12.50
1
SID Support
aeacpn
Medic
12.50
1
SID Support
Doyon
Pahl Superintendent
12.50
1
DIDIng
McMam Olgetld Servtms
Fueler
1250
1
SID Support
Vetm Gray
Wellhead Service
12.50
1
Drilling
ACS
emarmental
12.50
2
SID Support
Beacon
HSE
12.50
2
SID Support
Doyon
Tool pusher:
1250
2
Drilling
Doyon
HSE
12.50
2
Dulling
Hallburlon
Mutl Loggers
12.50
2
Drilling
Little Red
Pumping
12.50
2
Drilling
MI SWaco
Mud Plant
12.50
2
Drilling
GBR
Casing Service
1250
3
Dulling
Hellthutan
Slickline
12.50
3
Drilling
ASRC
Loll
12.W
4
SID Support
MI Sin.
WIF
12.50
4
SID Support
Purcell
Security1250
5
SID Support
ESS
Creating
12.50
10
SID Support
Jacobs
Truck driver l Crane operator
12.50
11
Drilling
Doyon
Rig Personnel
12. W
22
Dulling Total Drilling Personnel W
BOP Stack & Components
Description
Stan Data
Last Codification Data Pressure Rating )psi)
Tyus Make Model
ID Nom(in)
PRange (pai) Last Len Date
Slow Circulation Rates
Pum, Number: Make:
Model:
Stan Data End Date
Liner Size lin)
Volume Per Stroke Override (bMlsek) Max Pressure (psi)
Data Deplb(KKB)
Slow Sptl I
Strokes(a m)
Is(FE
I EH(%) OFlow lg,ml
Daily Bulk
Supply Item Description: Equipment Fuel
Unit Label: Gat
Unit Size: 1
Note:
OaK Consumetl Received
Returnetl Cum Consumed
Cum Received
Cum Reeur ad Cum On Luc Note
12/212018 1.4910 1,491.0
47,202.0
4],2020
0.0
0.0
SUPPIy IKm Description: Mutl Plant BOilars
Unit Label:
Gel
Unit Size:
Note:
Data lCasommus Received
Returned
Cum C -a. -Cum
Received
Can Returned Cum On Loc Nota
i21d2018 42.0 420
1,306.0
1,38fi.0
(10
O.0
Supply IKm DWHption: Rig Fuel
Unit Label:
gal us
Unit Size: 1
Note:
Date Consumed Recelved
Returns tl
Cum Consumetl
Gum Received
Cum
Returnetl Com On Los NOK
12/12018 1,BJ6.0 0.0
65,939.0
63.29J.0
00
-2,846.0
Sup Iatio,: Rig Water
Km DBScri1460
Unit 46e1:
hhl
Unit size:1
Note:
Gate Consumetl Recewetl
ened
Rtur
Gum Consumed
Cum Receivetl
m R.1owartl Cum On Loc
CuJesus
12!12018 0.0
1.612.0
1,6480
0.0
ME
Supply Ibrn Description: WIF Boilers
Use Label:
Gal
Unit Size:
Note:
MK Consumed Received
Returned!
Oum Consumetl
Cum RettWetl
Wm Returned Cum On Lm Note
12220ID 198.0 198.0
6,.40
6,5340
00
00
Supply Item Devalption: WIF kgecbtl owed
UKt Label:
Gal
Unit size:
Note:
Orta Consumetl Received
Returned Cum Consumed
Cum Received
Lum
Returrretl Cum On Loc Nob
1YL2018 420.0 420.0
13,230.0
13,230.0
OU
0.0
Last Aut Onty Visit
Dans Tot !sap. Nbr Total I.N.C. number CnnmeM
112]12018
BOP Test, AOGCC Jeff Jones witnessed
OOP test, nen test due 12/0412018
STOP Cams Submitted
Comyeny
a Rata
Co.
Doyon Drilling
8
PJSM'S
Doyon Drilling Inc.
8
HRWS
Doyon Drilling IM.
0
cow
Wysn Drilling Inc.
0
Safe Cabs
MI Swam
4
111RCIJSA
MI sis.
4
RIR's
General Notes
Comment:
cii S-11-
PRoAcTivE DIAGNOSTIC SERVICES, INC.
WELL LOG
TRANSMITTAL
To: ENI US Aoperating co., Inc.
Amjad Chaudhry
3800 Centerpoint Dr. RECEIVED E C c IVE D
Suite 300 R Gr V G
Anchorage, Alaska 99503
(907) 865-3379 FEB 0 1 2019
AOGCC
RE: Cased Hole/Open Hole/Mechanical Logs and /or Tubing Inspection (Caliper / MTT)
The technical data listed below is being submitted herewith. Please acknowledge receipt by
returning a signed copy of this transmittal letter to the attention of :
ProActive Diagnostic Services, Inc.
Attn: Diane Williams
130 West International Airport Road
Suite C
Anchorage, AK 99518
Fax: (907) 245-8952
1) Caliper Report 06 -Nov -19 SP05-FN041 Report/ 1 USB Drive 50-029-23481-00
2)
Signed :
Print Name:
CA 4, /" Date: Vl/I
PROACTIVE DIAGNOSTIC SERVICES, INC., 130 W. INTERNATIONAL AIRPORT RD SUITE C, ANCHORAGE, AK 99518
PHONE: (907)245-8951 FAX: (907)245-8952
E-MAIL: PDSANCHORAGE(mMEMORYLOG.COM WEBSITE: WWW.MEMORYLOG.COM
2 12 179
30 32 0
D:\Achives\NMsteriemplat6iles\Templates\Distribution\Ta smittdSheetiWilcomp.docx
?12179
30 32 0
Memory Multi -Finger Caliper
Log Results Summary
Company:
BP Exploration (Alaska), Inc.
Well:
SP05-FNO'4
Log Date:
November 6, 2018
Field:
Nikaitchuq Field - Spy Island
Log No.:
16596
State:
Alaska
Run No.:
1
API No.
50-029-23481-00
Pipe Description:
9.625 inch 40 Ib. L-80 BTC -M
Top Log Interval:
Surface
Pipe Use:
Production Casing
Bottom Log Interval:
11,709 Ft. (MD)
Inspection Type : Corrosive & Mechanical Damage Inspection
COMMENTS:
This caliper data is tied into the joint collar at 2,243.67 feet per the attached casing tally.
During logging operations, the tractor assembly weighed down the caliper tool string which resulted
in approximately 12 to 15 of the caliper fingers fully extending toward the high side and not recording
the inside of the pipe wall. Due to the high number of fully extended fingers, we are unable to
process the entire data for accurate wall penetration, cross-sectional wall loss or I.D. restriction
values. The following report is a combination of a visual inspection of the majority of the interval
logged and programmatically calculated wall penetration values in the area of interest.
This log was run to assess the condition of the production casing with respect to internal corrosive and
mechanical damage, particularly between 2,100 feet and 2,300 feet where previous well diagnostics have
isolated a leak. The caliper recordings indicate damage on three of the caliper fingers at -2,275 feet near
where a hole was recorded in the tubing that was pulled. The damage appears to be approximately 1.8
inches long and measures approximately 17% of wall thickness deep. Although the wall penetration value is
only 17% of wall thickness, the fact that no other significant events were recorded between the area of
interest, and it was recorded within 5 feet of the tubing hole, there is a high probability that the damage at
2,275 feet is the leak location. A 3-D log plot of the caliper recording across the recorded damage as well as
a cross-sectional illustration of the damage is included in this report.
A visual inspection of the interval of casing logged indicates no other significant areas of wall penetrations or
cross-sectional wall loss recorded. The caliper recordings indicate possible light deposits from -11,260 feet
to -11,640 feet. While looking at the un -centered data for buckling events, it appeared there might be slight
buckling from -750 feet to -1,400 feet. What appeared to be slight buckling is instead the tool rapidly
rotating as it sits on the low side while the well transitions to the vertical at the kick off point. This rapid
rotation gives the appearance of tool eccentricity due to buckling but is a result of the tool string and not a
well feature. A 3-D log plot of the caliper recordings across the interval of 9.625 inch casing logged is
included in this report. The blue stripe in the Image Map section of the attached 3-D log plot is the fully
extended caliper fingers and not a well feature.
D. Henley C. Waldrop Bruce & M. Grubb
J
ProActive Diagnostic Services, Inc. / .'.O. Box .369, Stafford, TX 77497
Phone: (281)'431-7100 0, (888) 565-)OR5 .'ax: (81) 43.-7125 E-n.A: PDSAnalvsisRmemorvloa com
Prudhoe Bay Flald 0'..fic2 Pnone: (90/) 659-230 Fax: (.907) 559-23P
,6c PDS Multifinger Caliper 3D Log Plot
`
Company: ENI Petroleum Field: Nikaitchuq Field -Spy Island
Well: SP05-FN7
Date : November 6, 2018
Description : Detail of Caliper Recordings Across Probable Hole in Production Casing at 2,275 Feet.
,_S
November 6, 2018
Well:
SP05-FN7
Field:
NikaitchugField - Spy Island
Company:
ENI Petroleum
Country:
USA
Tubing:
9.625 in. 40 ppf L-80 BTC -M
Cross Section for Joint 55 ar -'
Toolspeed = 46
Nominal ID = 8.835
Nominal OD = 9.625
Remaining wall area = 99%
Tool deviation = 55°
PDS Report Cross Sections
Survey Date:
November 6, 2018
Tool Type:
UW MFC 40 Ext. No. 218452
Tool Size:
2.75
No. of Fingers:
40
Analyst:
C. Waldrop
Finger = 6 Penetration = 0.081 in.
Probable Hole 0.08 in. = 17% Wall Penetration HIGH SIDE = UP
Vs.
PDS Multifinger Caliper 3D Log Plot
Company: ENI Petroleum
Well: SP05-FN7
Field: Nikaitchuq Field - Spy Island
Date : November 6, 2018
Description : Detail of Caliper Recordings Across 9.625 Inch Casing Logged.
Joint 280
11500
---- - -------I
Joint 281
11600--
1600
Y-
—Joint
Joint 282
Joint 283
Joint284
Joint 285
11700
— ---
Joint 286
Minimum I.D.
8 inches 10
Maximum I.D.
8 inches 10
Comments Depth Nominal I.D. 3-D Log Image Map
i..................................................................................................
lft:1200ft 8 inches 10 0° 0° 90° 18F 270^ 0°
STATE OF
A
ALA OIL AND GAS CONSERVATION COM SION RECEIVED
REPORT OF SUNDRY WELL OPERATIONS MAY 2 7 2016
1.Operations Abandon U Plug Perforations U Fracture Stimulate ❑ Pull Tubing❑ 4C G( itdown Li
Performed: Suspend ❑ Perforate ❑ Other Stimulate ❑ Alter Casing ❑ Change Approved Program ❑
Plug for Redrill ❑ erforate New Pool ❑ Repair Well ❑ Re-enter Susp Well❑ Other: ESP Change Out ❑✓
2.Operator Eni US Operating Co. Inc. 4.Well Class Before Work: 5.Permit to Drill Number:
Name: Development ❑✓ Exploratory ❑ 212-179
3.Address: 3800 Centerpoint Dr Ste 300,Anchorage,AK Stratigraphic❑ Service ❑ 6.API Number:
99503 50-629-23481-00-00
7.Property Designation(Lease Number): 8.Well Name and Number:
ADL 0391283,0388583,0388581,0388571 SP05-FN7
9.Logs(List logs and submit electronic and printed data per 20AAC25.071): 10.Field/Pool(s):
n/a Nikaitchuq/Schrader Bluff Oil Pool
11.Present Well Condition Summary:
Total Depth measured 21230 feet Plugs measured 20617 feet
true vertical 3733 feet Junk measured n/a feet
Effective Depth measured 20617 feet Packer measured n/a feet
true vertical 3918 feet true vertical n/a feet
Casing Length Size MD TVD Burst Collapse
Structural
Conductor 160 20" 160 160
Surface 3909 13-3/8" 3909 2452 5210 2480
Intermediate 11889 9-5/8" 11889 3997 6890 4790
Production
Liner 8911 5-1/2" 20674 3910 slotted slotted
Perforation depth Measured depth 11889-20617 feet 201
,coop JAN 0 6.
True Vertical depth 3997-3918 feet
Tubing(size,grade,measured and true vertical depth) 4-1/2"12.6 ppf L80 10,111'MD 3,677'TVD
Packers and SSSV(type,measured and true vertical depth) n/a n/a n/a n/a
12.Stimulation or cement squeeze summary:
Intervals treated(measured):
Treatment descriptions including volumes used and final pressure:
13. Representative Daily Average Production or Injection Data
Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure
Prior to well operation: 461 41 696 0 245
Subsequent to operation: 141 25 1011 0 240
14.Attachments(required per 20 AAC 25.070,25.071,&25.283) 15.Well Class after work:
Daily Report of Well Operations 0 Exploratory Development Service ❑ Stratigraphic ❑
Copies of Logs and Surveys Run ❑ 16.Well Status after work: Oil ❑✓ Gas Li WDSPL ❑
Printed and Electronic Fracture Stimulation Data ❑ GSTOR ❑ WINJ ❑ WAG ❑ GINJ ❑ SUSP❑ SPLUG❑
17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O.Exempt:
316-191
Contact Andrea Lazzari Email andrea.lazzari((t�,enipetroleum.corn
Printed Name Marc Kuck Title Well Ops Project Manager
Signature �A —' Phone (907)865-3323 Date 5/13/2016
Form 10-404 Revised 5/2015 /g-A0
Submit Original Only
6�X,,4 RBDMS t_l--- JUN q 2 2016
• U 0
U O O
WL _ •
Q)
O U a)
(`'� Z_ a)
0o7oo .-- \ cr
' 1 w cn a) ti > a)
w r� L .F+ C) ° c o 0 �j
i
' 75 dam, I E O O L U
V LCA a O o ._, Y k; o 0 0
O Lx U
R 11 p � V N a) a L � c
•o co (6 = (a 'Cr)
i I I 'j CO op~j
Cit NM=a Q 'E' Cf) U � 111
z0 �
U Z E c (6 I N M
0 O O
L r_� 2
O v U L L v' L H
X CO _c SQ)) /J�, \ (_)
OL ^` �/ I..- 1
a) •J
X 0) � � E (,..13
o' Q I I a) 0_
U c0 mco ,- . Y J Jln
C� I ti a E E (a ' 'l� -0
_ ETx N L O
_c a» co Q _ > I � � �
c E C7 6 0 0 = O c`i
C2- o U U 1 > (B O -c Orn
J73 CD c c H �, cp ,,
a) LLJ - CO M
ti) Tu o c coY H Lo (0 vi co CNI It o
N O
�_ Ucn 42E6N- m :11 � t
Q c .E � _c a) OSS in CO- L.1-- a) o =
O o N -o o > - (D o W a D' 1 a
c co (o 00 > H M __, CT] -c- ti I H
,C `� (81 ,«-' f
L 0 2 I I n` .(ii),-1
c_
o � UM U MCA a O - �
H C O c M r — O 8
7
O OH (o) � U M Q 00 , U U ' M c
L —
CL � Cn O� o a- c)
O E � 0 °�
O CO
Q Q 0 U 00 - C.rj ' / 45~ O
(O > 00 X a) N O � a0
N 0 _c O 3 �� co
r
of.
N
4 N § %7
j
i
+� oo VI N ,n 'Cr m
1n 1n oo a m 1n
2 N Q-1 eri ,moi ,moi ,-1
\ VV
c
(B
Op
tea ; rnH
co ,-i N V> >
. 1 lD Q
.-
c �N� c E 1
co Y/ M
U CO o — w N Cl N G7 al
_ - N M
Cr)- pp ti s
CO v1 111 111 to 1)1 v1 (6
r Y
2
Well Name: SP05-FN7 ORO ()Daily Report
Wellbore Name: SP05-FN
` Well Code: 26944
Date: 4/27/2016
Job: WORKOVER Report#: 1
nII
Page:1 of 1
Well Header
Permit/Concession N° Operator Subsidiary Initial Lahee.Code.
SOUTH PASS 46(F,I.) ENI PETROLEUM ENI Petroleum Co.Inc. DEVELOPMENT WELL
Rotary Table Elevation(m) Water Depth(m) First Flange(m) RKB-Base Flange(m) RKB-Tubing Spool(m)
16.34 0.00 5.17 11.17 9.67
Rig Information
Rig Name = Contractor Rig Type Rig Num
RIG 15 DOYON LAND RIG 0723
Daily Information
Weather Temperature(°C) Wind Days LTI(days) Days RI(days) POB -Overcast -1.9 N@ 7 MPH 62 0
Daily Summary Operations
24h Forecast
Pump 40 bbls 9.1 ppg bone do tubing,bleed off surface pressure,set BPV,blow do lines and prepare to nipple dn tree and N/U BOPE,build 9.1 brine and kill IA.
24h Summary
PJSM,Prep rig to move,blow dn steam lines,water to pit complex,pull service line jumpers,RID hard line to tiger tank,Move and stage pits down the pad,move sub off well SP04-SE5 and spot over SP05-FN7,
move and spot pit complex,Spot rock washer,PJSM,skid rig floor in to drilling position,Rigging up service lines for sub and pits,switch power to main generators,R/U berming around sub,R/U service lines to
rock washer,R/U outside choke lines,bring on steam and air around rig,remove decomplete tools from pipe shed,set up landing for outside stair cases,PJSM,cont rigging up interconnect lines,berming and
landings around rig.PJSM,rig up tiger tank lines and PT,rig up on well for bullheading,take on 630 bbls 8.8 PPG RO water to mud pits and wt up to 8.95 PPG,PJSM,PT lines T/2000 psi,pump 40 bbls heated
8.95 PPG brine do tubing,ICP 2 BPM @ 830 PSI,FCP 2 BPM @ 500 psi,swap over and pump 550 bbls 8.95 PPG brine down Ann,ICP 3 BPM @ 420 to 450 psi,FCP 3 BPM 460 to 530 psi,shut in well and
observed psi on both tubing and Ann,swap back and pump 40 bbls 8.95 PPG brine do tubing,ICP 2 BPM.910 psi,FCP 2 BPM @ 680 psi,Eni co.rep witnessed„PJSM,Shut in well and let U-tube starting @ 122
psi and ending at 70 psi,PJSM,bleed off through choke to tiger tank,T/38 psi,pressure climbed to 50 psi on Ann and 44 psi on tubing,shut in well,PJSM,wt up brine.in pits T/9.1 PPG T/pump down tubing.
Operation at 07.00
N/U Stack
Time Log
Start End Cum Dur
Time Time Dur(hr) (hr) Phase Opr. Act. Plan Oper.Descr.
00:00 02:00 2.00 2.00 W.O. A 1 P PJSM,Prep rig to move,blow do steam lines,water to pit complex,pull service line jumpers.RID hard line to tiger tank.
02 00 05:00 3.00 5.00'W 0 'A 2 P Move and stage pits down the pad,move sub off well SP04-SE5 and spot over SP05-FN7,move and spot pit complex.
05:00 06:00 ' 1.00' 6.00 W 0 A 2 P Spot rock washer.
06 00 07:00 1.00' 7.00 W.O. A 2 P PJSM,skid rig floor in to drilling position.
07:00 ..10:00 3.00 10.00 W.O. A 1 P Rigging up service lines for sub and pits.switch power to main generators,R/U berming around sub,R/U service lines to rock
washer.
10.00 12:00 2.00 12.00 W.O A 1 P 'R/U outside choke lines,bring on steam and air around rig,remove decomplete tools from pipe shed,set up landing for.
outside stair cases.
12:00 '13 00 1.00 13.00 W 0 A 1 'P PJSM,cont rigging up interconnect lines,berming and landings around rig,
13:00 16:30 3.50 16.50 W O. A 8 P PJSM,ng up tiger tank lines and PT,rig up onwell for bullheading,take on 630 bbls 8.8 PPG RO water to mud pits and wt up
to 8.95 PPG.
16:30 21:30 5.00' 21.50 W 0 M 9 P PJSM,PT lines T/2000 psi,pump 40 bbls heated 8.95 PPG bane do tubing,ICP 2 BPM @ 830 PSI,FOP 2 BPM @ 500 psi,
swap over and pump 550 bbls 8.95 PPG brine down Ann,ICP 3 BPM @ 420 to 450 psi,FCP 3 BPM.460 to 530 psi,shut in
well and observed psi on both tubing and Ann,swap back and pump 40 bbls 8.95 PPG brine do tubing,ICP 2 BPM 910 psi,'
FCP 2 BPM @ 680 psi,Eni co.rep witnessed.
21:30 22.30 1.00 22.50 W.O. M '8 P PJSM,Shut in well and.let U-tube starting @ 122 psi and ending at 70 psi.
22:30 23.30 1.00 23.50 W.O. M '8 P PJSM,bleed off through choke to tiger tank,T/38 psi,pressure climbed to 50 psi on Ann and 44 psi on tubing shut in well.
23:30 00.00 0.50 24.00 W.0 M '8 P PJSM,wt up brine in pits T/9.1 PPG T/pump down tubing.
Daily Contacts
Position Contact Name Company Title Email Office Mobile
Eni representative Bruce Simonson ENI Drilling Supv. 907-685-0715
Eni representative Russ Wimmer ENI Drilling Supv. SIDDrilling@enipetroleum.com 907-685-0715 907-320-0058
Eni representative Mitch Billington' ENI Drilling Supv/Clerk, akrigclerksdoyonl5@enipetroleum.com 907-685-0722
Eni representative Troy England ENI HSE
Eni representative Jeremey Decker ENI Expediter eniexpeditor@gmail.com 907-980-7545 907-980-7545
Tool Push Chad Johnson Doyon Drilling Tool Pusher rig15@doyondrilling.com 907-685-0716
Tool Push Pete Martinusen Doyon Drilling Tour Pusher rig15@doyondrilling.com 907-685-0716
Last Casing Seat
Cas.Type OD(in) ID(in) Grade Top(mKB) Bottom(mKB) TVD Bot.(mKB) Run Date
LINER 31/2 6,283,94 6,30113 1,18913 5/3/2014
aPaw.ft Well Name: SP05-FN7 ORO flijDaily Report
, �. Wellbore Name: SP05-FN
11
Well Code: 26944 Date: 4/28/2016
e Page:- Job: WORKOVER agRep : #: 2
Page:1 of 1
Well Header
Permit/Concession N° Operator Subsidiary Initial Lahee Code
SOUTH PASS 46(F.I.) ENI PETROLEUM ENI Petroleum Co.Inc. DEVELOPMENT WELL
Rotary Table Elevation(m) Water Depth(m) First Flange(m) RKB-Base Flange(m) RKB-Tubing Spool(m)
16.34 0.00 5.17 11.17 9.67
Rig Information
Rig Name Contractor r Rig Type' Rig Num
RIG 15 DOYON I iiiiiL�I LAND RIG 0723 .4
Daily Information
Weather Temperature(CC) Wind Days LTI(days) Days RI(days) POB
62.01
Daily Summary Operations
24h Forecast
Receive salt from deadhorse,weight up brine to 9.6 PPG,kill well.
24h Summary
PJSM,R/U and pump 40 bbls 9.1 PPG brine dn tubing.SITP 50 psi,IA 40 psi.initial injection pressure @ 2 BPM 750 psi,stage pump rate to 2.5 BPM 1170 psi,final injection,pressure 1030 psi.Shut do monitor
pressures.Tubing at 20 psi bleed off lines,tubing on vac.IA=133 psi,Set BPV,B/D,R/D hoses and equipment,PJSM,pull tree,prep and set test dart,N/U lower riser,PJSM,nipple up BOPE,PJSM,R/U
pumping lines to IA,simops loading 8.9 PPG RO water in pits and weight up to 9.1 PPG to kill IA.Service choke manifold,R/U BOP testing equipment,Pump 630 bbls 9.1 PPG brine down IA,initial IA pressure=
120 psi,initial injection pressure 190 psi @ 1.5 BPM,stage rates to 3.5 BPM @ 450 psi,final injection pressure=570 psi.Pumps off pressure 380 psi,after 5 min.120 psi,bleed back 20 bbls,IA pressure 50 psi,
shut in and monitor,pressure built to 120 psi.Bleed down IA to tiger tank F/120 PSI to 50 PSI.Cont.bleeding off IA.Rig up and purge air from choke,test lines and Equip.Test BOPE.AOGCC waived witness by
Lou Girmaldi 4-27-16.Al bled back 64.5 bbl during testing BOPE.RID and blow down test lines and Equip.Pull blanking plug and L/D test joint as per Vetco Grey Rep onsite.Install landing joint and rig up to pump
down tubing.PJSM W/all personnel.PT lines to 2,000 PSI.Pump 440 bbl 9.4 ppg Brine down tubing and IA,2 bpm W/ICP 900 PSI on tubing and 5.5 bpm W/ ICP 1,060 PSI on IA.FCP 1,140 PSI on tubing and
1,180 PSI on IA.Starting IA Press.58 PSI,210 bbl 9.4 ppg Brine away 556 PSI,440 bbl 9.4 ppg Brine away 721 PSI.Pumps off IA Press 120 PSI.Bleed of IA to Tiger Tank F.120 PSI to 17 PSI.Pressstarted to
climb up to 22 PSI,shut in IA.41 bbls bled back to Tiger Tank.Monitor IA 31 PSI.Load Pits with RIO Sea Water and prep to weight up to 9.6 ppg.
Operation at 07.00
Weighting up Brine to 9.6 PPG
Time Log
Start End Cum Dur
Time Time Dur(hr) (hr) Phase Opr. Act. Plan Oper.Descr.
00:00 01:00 1.00 1.00 W . M 9 P PJSM.R/U and pump 40 bbls 9.1.PPG brine dn tubing.SITP 50 psi,IA 40 psiinitial injection.pressure @ 2 BPM 750 psi,
stage pump rate to 2.5 BPM 1170 psi,final injection pressure 1030 psi.Shut do monitor pressures.Tubing at 20 psi bleed off
lines,tubing on vac.IA=133 psi.
01.00 02:00 100 2.00 W.O. M 1 P Set BPV,B/D,RID hoses and equipment.
02:00 03:30. 1:50 3.50 W.O. C '5 P PJSM,pull tree,prep and set test dart,N/U lower dser.
03 30 06 00 2.50 6.00 W . 'C 5 P PJSM,nipple up BOPE
06:00 08:00 2.00 8.00'W:0 'M 8 P PJSM,RWU pumping lines to IA,simops loading 8.9 PPG RO water in pits and weightup to9,1 PPG to kill IA.Service choke
manifold,R/U BOP testing equipment
08:00 12:00 4.00 12.00 W 0 M 9 P Pump 630 bbls 9.1 PPG brine down IA,initial IA pressure=120 psi,initial injection pressure 190 psi @ 1.5 8PM,stage rates
to 3.5 BPM @ 450 psi,final injection pressure=570 psi.Pumps off pressure 380 psi,after 5 min.120 psi,bleed back 20
bbls,IA pressure 50 psi,shut in and monitor,pressure built to 120 psi.
Note for this tour pumped 40 bbls dn tubing and 630 bbls dn IA with 20 bbls returned to tiger tank.
.12:00 1100. 1.00 13.00 W . M 9 P PJSA Bleed down IA to tiger tank Fl 120 PSI to 50 PSI.Cont.bleeding off IA.
13:00 14.00 1.00 14.00 W.O. C 1 P PJSA Rig up and purgeair from choke,test lines and Equip.
14.00 19:00 5.00 19.00 W . C : 12 P PJSM Test BOPE.Annular Preventer 250 PSI low and 2,500 PSI high.Choke Valves 1-14.Upper and Os, 4.5 IF
Dart&FOSV,Manual Choke&Kill,NCR Choke&KiIt,Kill Line Demco,Upper and Lower IBOP W/4, Int to 250
PSI low and 3,500 PSI high for 5 Min.Test Manual and Super Choke to 1.500 PSI.All charted.Paris ey test:Start
Press Manifold 11400 PSI System 3,050 PSI,Annular 750 PSI,after function:Manifold 1,350 PSI Sys 1,500 PSI,
Annular 700 PSI.200 PSI increase in 47 Sec.Full charge 188 Sec. 5 Nitrogen average 2,375 PSI AOGCC waived witness
by Lou Girmaldi 4-27-16.IA bled back 64.5 bbl during testing BOPE
19.00 19:30 0.50 19.50 W.O. C 5 .P -PJSA R/D and blow down test lines and Equip.
19 30 20:30 1.00 20.50 W.O. C 5 P 'PJSA Pull blankingplug and L/D test joint as per Vetco Grey Rep onsite.Install landing joint and rig up to pump down tubing.
20.30 22:00 1.50 22.00 W.O. M 9 'P I PJSM W/all personnel.PT lines to 2,000 PSI.Pump 440 bbl 9.4 ppg Brine down tubing and IA,2 bpm W/ICP 900 PSI on
tubing and 5.5 bpm W/ ICE 1,060 PSI on IA.FCP 1,140 PSf on tubing and 1,180 PSI on IA.Starting IA Press.58 PSI,210
bbl 9.4 ppg Brine away 556 PSI,440 bbl 9.4 ppg Brine away 721 PSI.Pumps off IA Press 120 PSI.
22.00 22:30 0.50 22.50 W.O. M 11 P PJSA Bleed of IA to Tiger Tank F.120 PSI to 17 PSI.Press.started to climb up to 22 PSI,shut in IA.41 bbls bled back to
Tiger Tank.
22:30 00:00. :1.50 24.00 W O M '20 'P PJSA Monitor IA 31 PSI Load Pits with.RIO Sea Water and prep to weight up to 9.6.ppg
Daily Contacts
Position Contact Name Company Title Email _ Office Mobile
Eni.representative Bruce Simonson ENI Drilling Supv. 907-685-0715
Eni representative Oliver Amend ENI Drilling Supv. 907-685-0715
Eni representative Mitch Billington ENI Drilling Supv/Clerk. akrigclerksdoyon15@enipetroleum.com 907-685-0722
Eni representative Paul Holley ENI HSE
Eni representative Jeremey Decker ENI Expediter eniexpeditor@gmail.com 907-980-7545 907-980-7545
Tool Push Justin Hays Doyon', Tool Pusher
Tool Push Pete Martinusen Doyon Drilling Tour Pusher rig15@doyondrilling.com 907-685-0716
Last Casing Seat
Cas.Type OD(in) ID(in) Grade Top(mKB) Bottom(mKB) TVD Bot.(mKB) Run Date
LINER 31/2 6,283.94 6,30113 1,18913 5/3/2014
oi*. Well Name: SP05-FN7 ORIIII •aily Report
Wellbore Name: SP05-FN7
Well Code: 26944• Ret ort#:9132016
Page:Job: WORKOVER Rep
Date:
1 of 1
Well Header
Permit/Concession N° Operator Subsidiary Initial Lahee Code
SOUTH PASS 46(F.I.) ENI PETROLEUM ENI Petroleum Co.Inc: DEVELOPMENT WELL
Rotary Table Elevation(m) Water Depth(m) First Flange(m) RKB-Base Flange(m) RKB-Tubing Spool(m)
16.34 0.00 5.17 11.17 9.67
Rig Information
Rig Name Contractor Rig Type Rig Num
RIG 15 DOYON - LAND RIG 0723
Daily Information
Weather Temperature(°C) Wind Days LTI(days) Days RI(days) POB:
Overcast -2.5 E @ 9 MPH 63.0
Daily Summary Operations
24h Forecast
Cont.to balance to well.Set Hanger and test upper and lower seals.Set BPV and test joint.Test Rams and Choke lines.R/D and.Pull Hanger and 4.5"Tubing.
24h Summary
PJSM Cont.well kill operations.Load Sea Water into Pits.Weight up to 9.6 ppg W/Nadl.SIMOPS Service,inspect and adjust brakes on Drawworks.Service and inspect TDS-8.Service and inspect Crown.A
Press.@ 90 PSI.Bleed off IA to Tiger Tank.Observe Gas/Oli returns for 15 Min.4 bbl crude recorded.Shut in IA,Press.at 40 PSI and increasing.SIMOPS Cont.loading Sea Water and weighting up to 9.6 ppg.
Hang Elephant Trunk on ESP Sheave in Derrick.Cont.Weight up Brine to 9.6 ppg.R/U GBR Power Tongs as per GBR Rep onsite.R/U and pump down tubing and IA,2 bpm down tubing ICP 250 PSI,5.5 bpm
down IA ICP 810 PSI.Stage rate down IA to 6.5 bpm CP 1,380 PSI.2 bpm down tubing FCP 730 PSI.Pumped total 440 bbl 9.6 ppg Brine.Shut down and monitor Press.Tubing 280 PSI,IA 350 PSI.After 40 Min.
Tubing 10 PSI,IA 41 PSI.Line up and bleed IA to Tiger Tank.Pull BPV as per Vetco Rep onsite.Tubing appears to be on a Vac.Monitor IA to Tiger Tank.R/U to pull tubing,install Mouse Hole.No flow observed
at Tank.PJSM WI all essential personnel.BOLDS as per Vetco Grey Rep onsite.Pull Hanger @ 170K on WT Indicator.100K String Weight,HST 140K.Monitor well,noticed Gas breaking out but no increase or
decrease in flow.Cont.to pull Hanger 4'above Well Head observed fluid increase.Slacked off and attempt to land Hanger 3X without success.Space out Hanger about 1'off profile.With no flow from Tubing
install Head Pin,plug valve and close.Close 3.5"X 6"upper rams.Install high Press.hose to plug valve.R/U Choke Manifold to Tiger Tank.Weight up surface brine to 9.6 ppg.Well shut in at 14 30.IA=5 PSI.
Bleed off IA through Choke Manifold to Tiger Tank.Observe Oil/Gas returns till 19:30 W/4 bbl of crude recorded.Shut in IA.Bull head 640 bbl 9.6 ppg Brine through Kill Line.Initial Press.25 PSI.Pump 5 bpm
ICP 250 PSI,stage up to 8 bpm FCP 767 PSI.Shut down and monitor well.Shut IA Press.370 PSI.Monitor shut in IA IP=370 PSI FP=23 PSI.Check Tubi
Operation at 07.00
Testing Upper pipe ram's,choke HCR/Kill HCR
Time Log
Start End Cum Dur'.
Time ', Time Dur(hr) (hr) _ Phase Opr. Act. Plan Oper.Descr.
00:00 03.30 3.50 3.50 W:0 M 20 P PJSM Cont.well kill operations.Load Sea Water into Pits.Weight up to 9.6 ppg W/NaCI.SIMOPS Service,inspect and
adjust brakes on Draw-works.Service and inspect TDS-8.Service and inspect Crown.:
03.30 -06:00 ..2.50 6.00 W.O.. M 20 P IA Press.@ 90 PSI.Bleed off IA to Tiger Tank.Observe Gas/cm returns for 15 Min 4 bbl crude recorded Shut in.IA,Press.
at 40 PSI and increasing.SIMOPS Cont.loading Sea Water and weighting up to 9.6 ppg.
06:00 07.00 1.00 7.00 W.O. M '5 P PJSM Hang Elephant Trunk on ESP Sheave in Derrick.
07:00 09:30 2.50 9.50 W 0 'M '20 P PJSA Cont.Weight up Brine to 9.6 ppg.R/U GBR Power Tongs as per GBR Rep onsite.
09 30 11:30 2.00 11 50 W 0 M 9 P 'R/U and pump down tubing and IA,2 bpm down tubing ICE 250 PSI,5.5 bpm:down IA ICE 810 PSI.Stage rate down IA to
6.5 bpm CP 1,380 PSI.2 bpm down tubing FCP 730 PSI.Pumped total 440 bbl 9.6 ppg Bnne.Shut down and monitor Press
Tubing 280 PSI.IA 350 PSI.After 40 Min.Tubing 10 PSI,IA 41 PSI.Line up and bleed IA to Tiger Tank.
11 30 12:00 0.50 12.00 W.O. C 19 P PJSA Pull BPV as per Vetco Rep onsite.Tubing appears to be on a Vac.
12:00 '14'00 ' -2.00 14.00 W.O. G 20 P PJSM Monitor IA to Tiger Tank.R/U to pull tubing,install Mouse Hole.No flow observed at Tank.
1400 14:30 ' 0.50 14.50 W.O. G 19 P PJSM W/all essential personnel.BOLDS as per Vetco Grey Rep onsite..Pull Hanger @ 170K on WT Indicator:..100K String
Weight,HST 140K.Monitor well,noticed Gas breaking out but no increase or decrease in flow.Cont to pull Hanger 4'above
Well Head observed fluid increase.Slacked off and attempt to land Hanger 3X without success.
14:30 19.30. 5.00 19.50 W.O. M '20 P Space out Hanger about 1'off profile.With no flow from Tubing install Head Pin,plug valve and close.Close 3.5"X 6"upper
rams.Install high Press'.hose to plug valve.R/U Choke Manifold to Tiger Tank.Weight up surface brine to 9.6 ppg.Well shut
in at 14.30.IA=5 PSI Bleed off IA through Choke Manifold to Tiger Tank.Observe Oil/Gas returns till 19:30 WI 4 bbl of
crude recorded.Shut in IA.
19:30 21:30 2.00' 21.50 W 0 'M '9 P PJSM Bull head 640 bbl 9.6 ppg Brine through Kill Line.initial Press.25 PSI.Pump 5 bpm ICE 250 PSI,stage up to8 bpm
FCP 767 PSI.Shut down and monitor well.Shut IA Press.370 PSI
21 30 23:00 1.50 23.00 W 0 'M '20 P ,. Monitor shut in IA IP=370 PSI FP=23 PSI.Check Tubing Press with positive discharge.Appears to be over balanced
SIMOPS Bring on Sea Water to Pits.
23'00 00:00 1.00 24.00 W 0 M '20 P PJSA Bleed off IA through high Press.hose and hard line straight to Tiger Tank.0 PSI on IA with minimal crude returns:'.R/U
Tubing to Choke.Manifold to Tiger Tank.Bleed off Tubing and IA to Tiger Tank to balance well
Daily Contacts
Position Contact Name Company Title Email Office Mobile
Eni representative Bruce Simonson ENI Drilling Supv. 907-685-0715
Eni representative Oliver Amend ENI Drilling Supv. 907-685-0715
Eni representative Mitch Billington ENI Drilling Supv/Clerk. akrigclerksdoyonl5@enipetroleum.com 907-685-0722
Eni representative Matt Smith ENI Malls Coordinator
Eni representative Paul Holley ENI HSE
Eni representative Jeremey Decker ENI Expediter eniexpeditor@gmail.com 907-980-7545 907-980-7545
Tool Push Justin Hays Doyon Tool Pusher
Tool Push Pete,Martinusen Doyon Drilling Tour Pusher rig15@doyondrilling.corn 907-685-0716
Last Casing Seat
Cas.Type OD(in) ID(in) Grade Top(mKB) ::Bottom(mKB) TVD Bot.(mKB) Run Date
LINER 3112 6,283.94, 6,30713 1,189.13 5/3/2014
Well Name: SP05-FN7 OR
• (Daily Report
Wellbore Name: SP05-FN7
Well Code: 26944 Date: 4/30/2016
Report#: 4
Job: WORKOVER
Page:1 of 1
Well Header
'Permit/Concession N° Operator Subsidiary Initial Lahee Code
SOUTH PASS 46(F.I.) ENI PETROLEUM ENI Petroleum Co.Inc. DEVELOPMENT WELL
Rotary Table Elevation(m) Water Depth(m) First Flange(m) RKB-Base.Flange(m) RKB-Tubing Spool(m)
16.34 0.00 5.17 11.17 9.67
Rig Information
Rig Name - ': Contractor Rig Type :.Rig Num
RIG 15 DOYON LAND RIG ` 0723
Daily Information
Weather Temperature(°C) Wind Days LTI(days) Days RI(days) POB
Overcast -2.6 N @ 11 MPH 64.0,
Daily Summary Operations
24h Forecast
Monitor IA,Build and weight up to 9.9 ppg Brine.Bullhead 640 bbl down Tubing and IA.Monitor well and pull Tubing.
24h Summary
Cont.monitor IA Press.@ 1 to 1.5 PSI,bleeding off to Tiger Tank as required.Tubing 0 PSI.Open upper Pipe Rams and land Hanger.RILDS.Test upper and lower Hanger seals to 5,000 PSI for 10 Min.per
Vetco Grey rep onsite,witnessed by Co Rep and Driller.R/D pumping Equip.UD Landing Joint.Set BPV,P/U 4.5"test joint and set Blanking Plug in Hanger.R/U and test 3.5"X 6"Upper Rams W/4.5"Test Joint,
Choke/Kill HCR 250 PSI low and 3,500 PSI high.Charted 5 Min.each.R/D testing Equip.Pull test joint and Blanking Plug.Pull BPV as per Vetco Grey Rep.Tubing on Vac.Set landing joint and R/U Circ..Equip.
SIMOPS Monitor IA Press.10 PSI.Cont.Monitor IA Press.@ 16 PSI,Tubing 0 PSI.Loading Sea Water into Pits.Weight up to 9.8 ppg.At 07:45 IA 37 PSI,bleed down to 0 PSI.Gas returns only.Shut in and
Cont.to monitor while weighting up Brine.At 11:30 tubing on vac,IA at 37 PSI.Built 890 bbl of 9.8 ppg in Pits.Start bull heading at 6 bpm ICP 800 PSI,stage up to 8 bpm WI FCP 1,660 PSI WI 640 bbl of 9.8 ppg
pumped total.Shut in well.Monitor IA 244 PSI,50 min.later IA 28 PSI.Bleed IA straight to Tiger Tank W/Gas,Crude Oil and Brine,4 bbls returned to Tiger Tank.Crude oil returns where seen at Tubing.Shut in
IA.Monitor IA-12 PSI at 14:45.RIU to take tubing returns through Choke Manifold to Tiger Tank.Bleed Tubing to Tiger Tank,minimum crude,Brine and Gas observed.Shut in Tubing. IA-7 PSI at 16:00.
SIMOPS Pits took on 290 bbl Sea Water.Weight up 210 bbl to 9.8 ppg.RIU to pump down Tubing.Bullhead 40 bbl 9.8 ppg at 2 bpm ICP 0 PSI,FCP 670 PSI.Shut down 16:45 IA 22 PSI.Bleed off to Tiger
Tank to 0 PSI.Tubing and IA on Vac.Flush and blow down lines.PJSM Monitor IA 2 PSI.R/U to Circdown tubing through IA and out to Tiger Tank.Pump 100 bbl 9.8 ppg Brine at 2 bpm,ICP 490 PSI FCP 540
PSI,Seen returns to Tiger Tank at about 20 bbls away,total 18 bbl of Crude Oil returned to Tiger Tank.Shut down pump,bleed IA to Tiger Tank w
Operation at 07.00
Weighting up brine to 9.9 PPG
Time Log
Start End Cum Dur
Time Time Dur(hr) (hr) Phase Opr. Act. Plan Oper.Descr.
00:00 02:00 2.00 2.00.W 0 M 11 P PJSM Cont.monitor IA Press.@ 1 to 1.5 PSI,bleeding off to Tiger Tank as required.Tubing()PSI.
02:00 03:00 1.00 3.00 W.O. C 20 P Open upper Pipe Rams and land Hanger.RILDS.Test upper and lower Hanger seals to 5,000 PSI for 10 Min per Vetco Grey
rep onsite,witnessed by Co Rep and Driller.
03:00 03'30 0.50 3.50 W.O. C 5 - P PJSA RID.pumping Equip.UD Landing Joint.Set BPV,P/U 4.5"test joint and set Blanking Plug in Hanger.
03:30 04'30 1.00 4.50 W.O. C 12 P RIU and test 3:5"X 6"Upper Rams W/4.5"Test Joint,Choke/Kill HCR 250 PSI low and 3,500 PSI high.Charted 5 Min.
each.RID testing Equip.Pull test joint and Blanking Plug.
04:30 05.00 0.50 5.00 WI O. C 5 P Pull BPV as per Vetco Grey Rep.Tubing on Vac Set landing joint.and RIU Circ.Equip.SIMOPS Monitor IA.Press:10 PSI
05:00 06.00 .1.00 6.00'W 0 M 11 'P Cont.Monitor IA Press.@ 16 PSI,Tubing 0 PSI 06.00 12:00 6.00 12.00'W:O. M 20 r P Loading Sea Water into Pits.Weight up to 9.8 ppg.At 07:45.IA 37 PSI,bleed down to 0 PSI.Gas returns only.Shut in and
Cont.to monitor while weighting up Brine..At 11.30 tubing on vac,IA at 37 PSI.
12:00 13:30 1:50 13.50 W.0 M 9 'P PJSM Built 890 bbl of 9.8 ppg in Pits.Start bull heading at 6 bpm ICP 800 PSI,stage up to 8 bpm WI FCP 1,660 PSI WI 640
bbl of 9.8 ppg pumped total.Shut in well.
13.30 i 14:30 1.00 14.50 W.O.:' M 11 P Monitor IA 244 PSI,50 min.later IA 28 PSI.Bleed IA straight to Tiger Tank W/Gas,Crude Oil and Brine,4 bbls returned to
Tiger Tank.Crude oil returns where seen at Tubing.Shut in IA,
14:30 16:00 1.50 16.00 W.0 M 11 P Monitor IA-12 PSI at 14:45.RIU to take tubing returns through Choke Manifold to Tiger Tank:Bleed Tubing to Tiger Tank,
minimum crude,Brine and Gas observed.:Shut in Tubing. IA-7 PSI 0116:00.SIMOPS Pits took on 290 ON Sea Water:
Weight up 210 bbl to 9.8 ppg
16:00 : 18:00 2:00 18.00 W.O. M 9 P PJSM RIU to pump down Tubing.Bullhead 40 bbl 9.8 ppg at 2 bpm ICP 0 PSI,FCP 670 PSI.Shut down @ 16:45 IA 22 PSI.
Bleed off to Tiger Tank to 0 PSI.Tubing and IA on Vac.Flush and blow down lines
18:00 21:00 3:00 21.00 W.O. M 9 P PJSM Monitor IA 2 PSI.RIU to Circdowntubing through IA and out to Tiger Tank Pump 100 bbl 9.8 ppg Brine at 2 bpm,
ICP 490 PSI FCP 540 PSI,Seen returns to Tiger Tank at about 20 bbls away,total 18 bbl of Crude Oil returned to Tiger
Tank.Shut down pump,bleed IA to Tiger Tank with 25 PSI.Tubing on.vac.Shut in Tubing.At 20:25 Shut in IA 5 PSI,20:30.
IA 12 PSI,21:00 IA 13 PSI.SIMOPS Build 9.9 ppg Brine in Pits.
21:00 00:00 3.00 24.00 W.O. M 20 P Open IA to Tiger Tank and monitor,IA 0 PSI,At 22:00 Shut in IA 0 PSI,22:30 IA 6 PSI,23:00 IA 7 PSI SIMOPS Cont.to
weight up to 9.9 ppg
Daily Contacts
Position Contact Name _ Company Title Email Office: Mobile
Eni representative` Bruce Simonson ENI Drilling Supv. 907-685-0715
Eni representative Oliver.Amend ENI + Drilling Supv. 907-685-0715
Eni representative Mitch Billington ENI Drilling Supv/Clerk. akrigclerksdoyon15@enipetroleum.con) 907-685-0722
Eni representative - Matt Smith '-.ENI `Malls Coordinator
Eni representative Paul Holley ENI HSE
Eni representative Jeremey Decker ENI Expediter eniexpeditor@gmail.corn 907-980-7545 907-980-7545
Tool Push : Justin Hays - Doyon Tool Pusher
Tool Push Pete Martinusen Doyon Drilling Tour Pusher rig15@doyondrilling.com 907-685-0716
Last Casing Seat
Cas.Type OD(in) ID(in) Grade Top(mKB) Bottom(mKB) TVD Bot,(mKB) Run Date
LINER : 31/2 6283.94 6,30113 1,18913 5/3/2014
Well Name: SP05-FN7 OR Dally Report
Wellbore Name: SP05-FN
Well Code: 26944 •Date: 5/1/2016
2n Job: WORKOVER Report#: 5
Page: 1 of 1
Well Header
Permit/Concession N° Operator Subsidiary Initial Lahee Code
SOUTH PASS 46(F.I.) ENI PETROLEUM EM Petroleum.Co.Inc. DEVELOPMENT WELL
Rotary Table Elevation(m) Water Depth(m) First Flange(m) RKB-Base Flange(m) RKB-Tubing Spool(m)
16.34 0.00 5.17 11.17 967
Rig Information
Rig Name Contractor Rig Type Rig Num
RIG 15 DOYON LAND RIG 0723
Daily Information
Weather Temperature(°C) Wind Days LTI(days) Days RI(days) POB'....
Overcast -3.1 N @ 10 MPH 64.0
Daily Summary Operations
24h Forecast
RID and blow down lines.Monitor well,Tubing on Vac and dead,Fluid falling on back side.POOH 4.5"Tubing 500'and swap reels in spooler.Cont.to POOH 4 5"Tubing.
24h Summary
PJSM,Cont to build brine volume and weight up to 9.9 PPG,cont to monitor IA pressures @ 1:00 IA @ 17 psi,bleed off to 0 psi on gauge for 15 min.(gas returns only)shut in IA,after shut in observed pressure
building again.Tubing on a vac cont to weight up brine in mud pits.IA @ 06.00 13 psi,tubing static.Cont.to build volume and weight up brine to 9.9 PPG and monitor IA pressures.At 07:40.IA pressure @.16 psi,
bleed pressure to tiger tank. Pump 9.9 PPG brine down tubing and IA ICP on tubing 500 psi @ 2 BPM,ICP on IA 910 psi,stage pump rates to 2 BPM on tubing @ 680 psi,7 BPM do IA @ 1250 psi,FCP on tubing
910 psi,FCP on IA 1380 psi,pumped 720 bbls 9.9 PPG brine. Monitor well,initial shut in pressures are 270 psi on tubing,410 psi on.IA, at 11.00 tubing and IA went on a slow vac.Monitor well while on vac-8 psi
initial to-10 psi on IA,tubing on a vac.PJSM W/all essential personnel.ROLD as per Vetco Rep onsite.IA-11 PSI.Open IA to Tiger Tank.Pull Hanger free @ 120K,HST 139K,SLK 95K.Baker Rep disconnect
ESP and CAP line.Remove Penetrator,UD Landing Joint and Hanger.POOH W/4.5"Tubing,ESP and CAP lines F/10,525'to 8,293'MD.HST 132K.Fill 9.9 ppg Brine 10 bbl per hour.Fill 4 bbl every 10 joints
with no returns to surface.SIMOPS lake on 580 bbl Sea Water.PJSM W/all essential personnel for shearing out GLM.M/U TDS-8,X/O and Floor Valve to 4.5"Tubing.Pressure up with 9.9 ppg Brine at 0.5 bpm,
sheared GLM @ 3,200 PSI stand pipe Press.PJSM Cont.to pump down 4.5"Tubing W/9.9 ppg Brine @ 1 bpm due to hydrostatic Presson the back side,to control Crude Oil from going down flow line.Total
pumped 150 bbl down tubing.Loss for Tour 246 bbl
Operation at 07.00
POOH W/4.5"Completion @ 7,850'MD
Time Log
Start End Cum Dur
Time Time Dur(hr) (hr) Phase Opr. Act. Plan Oper.Descr.
00 00 06:00 6.00 6.00 W 0 M 8 P PJSM,Cont to build brine volume and weight up to 9.9 PPG,cont to monitor IA pressures @ 1 00 IA @ 17 psi,bleed off to 0
psi on gauge for 15 min.(gas retums only)shut in IA,after shut in observed pressure building again.Tubing on a vac cont to
weight up brine in mud pits.IA @ 06:00 13 psi,tubing static.
06:00 08:00 2.00 8.00 W.O. M 8 P Cont.to build volume and weight up brine to 9.9 PPG and monitor IA pressures.At 07:40 IA pressure @ 16 psi,bleed
pressure to tiger tank.
08:00 '09.00 ' 1.00 9.00 W 0 M 9 P Pump 9.9 PPG brine down tubing and IA ICP on tubing 500 psi @ 2 BPM,ICP on IA 910 psi,stage pump rates to 2 BPM on
tubing @.680 psi,7 BPM do IA @ 1250 psi,FCP on tubing 910 psi,FCP on IA 1380 psi,pumped 720 bbls 9.9 PPG brine.
09:00 11 00 2.00' 11.00 W.0. M 1 P Monitorwell,initial shut in pressures are 270 psi on tubing,410 psi on IA, at 11 00 tubing and IA went on a slow vac.
11:00 12:00 1.00 1200 W 0 M1 P Monitor well while on vac-8 psi initial to-10 psi on IA,tubing on a vac.
12.00 14.00 2.00 14.00 W.O. C 19 P PJSM W/all essential personnel.ROLD as per Vetco Rep onsite.IA-11 PSI.Open IA to Tiger Tank.Pull Hanger free @
120K,HST 139K,SLK 95K.Baker Rep disconnect ESP and CAP line.Remove Penetrator,L/D Landing Joint and Hanger. (
' 14.00 19:30 5.50 19.50 W.O. L 4 P PJSA POOH W/4.5"Tubing,ESP and CAP lines F,10,525 to 8,293'.MD.HST 132K.Fill 9.9 ppg Brine 10 bbl per hour.Fill 4
bbl every 10 joints with no retums to surface.SIMOPS take on 580 bbl Sea Water.
19.30 21:00 1.50 21.00 W.O.' L 19 P 'PJSM W/allessential personnel for shearing out GLM.M/U TDS-8,X/O and Floor Valve to 4.5"Tubing.Pressure up with 9 9
ppg Brine at 0.5 bpm,sheared GLM @ 3,200 PSI stand pipe Press.
21:00 00'00 3.00 24.00 W.O. L 9 'P 'PJSM Cont,to pump down 4.5"Tubing W/9.9 ppg Brine @ 1 bpm due to hydrostatic Presson the back side,to control
Crude Oil from going down flow line.Total pumped 150 bbl down tubing.Loss for Tour 246 bbl.
Daily Contacts
Position Contact Name Company Title Email Office Mobile
Em representative Bruce Simonson ENI Drilling Supv. 907-685-0715
Eni representative Oliver Amend ENI Drilling Supv. 907-685-0715
Eni representative Mitch Billington ENI Drilling Supv/Clerk. akrigclerksdoyonl5@enipetroleum.com 907-685-0722
Eni representative Matt Smith ENI Matls Coordinator
Eni representative Paul Holley ENI HSE
Eni representative Jeremey Decker ENI Expediter eniexpeditor@gmail.com 907-980-7545 907-980-7545
Tool Push Justin Hays Doyon Tool Pusher
Tool Push Pete Martinusen Doyon Drilling Tour Pusher rig15@doyondrilling.com 907-685-0716
Last Casing Seat
Cas.Type OD(in) ID(in) Grade Top(mKB) Bottom(mKB) TVD Bot.(mKB) Run Date
LINER 31/2 ,. : 6,283.94 6,301.13 1,189.13 5/3/2014
icor* Well Name: SP05-FN7 OR Dally Report
Wellbore Name: SP05-FN
Well Code: 26944 Date: 5/2/2016
.' Report#: 6
2 n ll Job: WORKOVER Page:1 of 1
Well Header
Permit/Concession N° Operator Subsidiary Initial Lahee Code
SOUTH PASS 46(F.I.) EM PETROLEUM EM Petroleum Co.Inc - DEVELOPMENT WELL
Rotary Table Elevation(m) Water Depth(m) First Flange(m) RKB-Base Flange(m) RKB-Tubing Spool(m)
16.34 0.00 5.17 11:17 9.67
Rig Information
Rig Name Contractor Rig Type Rig Num
RIG 15 I' DOYON LAND RIG 0723
Daily Information
Weather Temperature(CC) Wind Days LTI(days) Days RI(days) POB
Overcast -2.0 NNE @ 15 MPH 68.0
Daily Summary Operations
24h Forecast
Spot Schlumberger Equip.Schlumberger timed out.R/U Schlumberger tools and Equip.to rig floor.RIH to perform tubing punch.POOH W/Slickline and UD tools and Equip.Pump through tubing and Cont.to
POOH UD 4.5"Tubing,ESP and CAP line.UD Pump and motor.
24h Summary
PJSM at 8,293 MD,monitor well after pumping down tubing.Well on Vac..Perform well control drill with rig crew and third party.POOH 4.5"Tubing,ESP and Cap line Fl 6,293'to 8,171'MD.Gator Splice at rig
floor,cut out Gator Splice and prep to pull splice to Spool Unit.Cont.to POOH F1 8,171'to 7,688'MD.HST 128K.PJSM Change ESP reel at Spooling Unit.PJSA POOH 4.5"Tubing,ESP and CAP line Fl 7,888'to
3,900'MD.HST 105K.Cont.to pump 10 bbl 9.9 ppg Brine every hour and double displacement,Pump 170 bbl loss for tour.Drift and strap joints in Pipe Shed. PJSA POOH 4.5"tubing,ESP and CAP line F/
3,900'to 2,572'MD.HST 102K.Observe Crude at top of tubing at rig floor.PJSM R/U to pump down tubing.Pump 9.9 ppg Brine @ 0.5 bpm,Press.up to 1,200 PSI.Shut down and decision was made to reverse
Circ due to pack off.PJSM R/U to reverse Circ.out to Tiger Tank.Pump 212 bbl 9.9 ppg Brine W/1 bbl retuming to tiger tank,shut down decision made to get OLE E-line I Halliburton on location to do tubing
punch,PJSM,monitor well,clean and clear rig floor,drift and strap jots UD.R/U and pump do tubing through head pin @.5 BPM,pressured up to 400 psi due to pack off,clean canon clamps for disposal,bring on
225 bbls 9.9 brine to pits.pumped 10 bbls every hour and double displacement,total loss to hole this tour 250 bbls SIMOPS Schlumberger on location @ 23:00 Perform SID and Rig oreintaion.
Operation at 07.00
Work on brine prep canon clamps,E-line crew timed out crew rest.
Time Log
Start End Cum Dur
Time Time Dur(hr) (hr) Phase Opr. Act. Plan Oper.Descr.
0000 '01:00 1.00 1.00 W.O. L 11 P PJSM at 8,293 MD,monitor well after pumping down tubing.Well on Vac.`Perform well control drill with rig crew and third
party.
01:00 02.30 1.50 .2.50 W 0 L 4 P POOH 4.5"Tubing,ESP and Cap line F/8,293'to 8,171'MD.Gator Spice at rig floor,cut out Gator Splice and prep to pull
splice to Spool Unit.Cont.to POOH P1 8,171'to 7,888'MD.HST 128K.
02:30 03:30 1.00 3.50 W.O. L 20 P PJSM Change ESP reel at Spooling Unit.
03:30 '12:00 8.50 12.00 W.O. L 4 P PJSA POOH 4.5"Tubing,ESP and CAP line F/7,888'to 3.900'MD_HST 105K.Cont.to pump 10 bbl 9 9 ppg Brine every
hour and double displacement,Pump 170 bbl loss for tour.Drift and strap joints in Pipe Shed
12:00 '13.30 1.50 13.50 W.O. 'L 4 'P 'PJSA POOH 4.5"tubing,ESP and CAP line F/3,900'to2,572'MD.HST 102K.
1330 14:30 1.00 14.50 W 0 L 9 P Observe Crude at top of tubing at ng floor.PJSM RfU to pump down tubing.Pump 9.9 ppg Brine @ 0.5 bpm,Press up to
1,200 PSI.Shutdown and decision was made to reverse Circdue to pack off.
14:30 17:00 2.50 17.00 W.O. L 9 U PJSM Rill to reverse Circout to Tiger Tank.Pump 212 bbl 9.9 ppg Brine W/1 bbl returning to tiger tank,shut down decision
made to get SLB E-line on location to do tubing punch.
17.00 21.00 4.00 21.00 W.O. L 1 U PJSM,monitor well,clean and clear rig floor,drift and strap jots UD.
21.00 00.00 3.00 24.00 W 0 L1 U R/U and pump down tubing through head pin .5 BPM,pressured up to 400 psi due to pack off;clean canon clamps for
disposal,bring on 225 bbls 9.9 brine to pits.pumped 10 bbls every hour and double displacement,total loss to hole this tour
250 bbls.SIMOPS Schlumberger on location @ 23:00 Perform SID and Rig oreintaion..
Daily Contacts
Position Contact Name Company Title Email Office Mobile
Eni representative Bruce Simonson - ENI Drilling Supv. 907-685-0715
Eni representative Oliver Amend ENI Drilling Supv. 907-685-0715
Eni representative Mitch Billington ENI Drilling Supv/Clerk. akrigclerksdoyon15@enipetroleum.cow 907-685-0722
For representative Matt Smith ENI Malls Coordinator
Eni representative Paul Holley ENI HSE
For representative Jeremey Decker ENI Expediter eniexpeditor@gmail.com 907-980-7545 907-980-7545
Tool Push Justin Hays Doyon Tool Pusher
Tool Push Pete Martinusen Doyon Drilling Tour Pusher rig15@doyondrilling.com 907-685-0716
Last Casing Seat
Cas.Type OD(in) ID(in) Grade Top(mKB) Bottom(mKB) TVD Bot.(mKB) Run Date
LINER 31/2 6,283.94 6,301.13 1,189.13 5/3/2014
Well Name: SP05-FN7 ORO 1pDaiIy Report
Wellbore Name: SP05-FN7
Well Code: 26944 Date: 5/3/2016
Job: WORKOVER Ra #:
Page:
1 1 of 1
Well Header
Permit/Concession N° Operator Subsidiary Initial Lahee Code
SOUTH PASS 46(F.L) ENI PETROLEUM EM Petroleum Co.Inc. '. DEVELOPMENT WELL
Rotary Table Elevation(m) Water Depth(m) First Flange(m) RKB-Base Flange((m) - RKB-Tubing.Spool(m)
16.34 0.00 5.17 11.17 9.67
Rig Information
Rig Name - Contractor - Rig Type Rig Num
RIG 15 DOYON LAND RIG 0723
Daily Information
Weather Temperature(CC) Wind Days LTI(days) Days RI(days) POB
Couds -3.8 NNE @ 11 MPH 67.0
Daily Summary Operations
24h Forecast
POOH 1,000'4.5"Tubing,ESP and CAP line.R/U to suck out tubing to Vac Truck.Clean out and UD Tubing to Pump.Note sand in tubing string and get sample.UD Pump,Motor and Shroud.
24h Summary
PJSM Cont.cleaning Cannon Clamps for disposal.Loading Brine and weight up.Prep tubing for rerun.Schlumberger slick line Mob Equip till 02:00 and timed out.Service TDS-8,Hook,Block and Drawworks.
Finnish cleaning Cannon Clamps for disposal.Prep rig floor for slick line operations.PJSM WI all parties.R/U Slickline for tubing punch run.RIH W/Tubing Punch on Slickline to 1,360'SLM.Log up 4 collars F/
1,360'to 1,223'SLM.Could not slack back down.PIU to 1,222'SLM and punch four 1/4"1'shot holes in tubing.(JD Slickline.PJSM R/U and pump down 4.5"Tubing W/9.7 ppg Brine at 2 bpm,240 PSI.1.5X
Tubing capacity.R/U POOH 4.5"Tubing,ESP and CAP line F/2,572'to 1,846'MD HST 98K.SIMOPS Took on 225 bbl 9.9 ppg Brine to Pits.Observe tubing full of Brine.R/U and pump 2 bpm,80 PSI,1 5X
Tubing capacity W/9.7 ppg Brine.POOH 4.5"Tubing,ESP CAP line FI 1,846'to 1,363'MD,FIST 92K.UD'Jnt 32 WI holes,JNT 55 and 52 bad.PJSM WI all parties.Clean and clear rig floor.Prepfor slickline.R/U
Slickline.RIH W/Weight Bars to 997'SLM.POOH to P/U Tubing Punch.PJSM W/all parties.M/U SLB Tubing Punch and BHA.RIH to 1,037'SLM.Pull up hole 3 collars verify measurement.SLK off to 1,000'
SLM.Punch four 1/4"1'shot holes in tubing just above collar.POOH and R/D Slickline.RN and pump down 4.5"Tubing @ 1 bpm,790 PSI 1.5X tubing volume W/9.7 ppg Brine.Cont.to fill back side at 10 bph.
Total today 308 bbl lost.
Operation at 07.00
At 500'MD Clean out tubing with Vac truck and POOH UD 4.5"Tubing.
Time Log
Start End Cum Dur
Time Time Dur(hr) (hr) Phase Opr. Act. Plan Oper.Descr.
00:00 05:00 5.00 5.00 W.O. L 20 U PJSM Cont.cleaning Cannon Clamps for disposal.Loading Brine and weight up.Prep tubingfor.rerun.Schlumberger slick
line Mob Equip till 02:00 and timed out.
05.00 06:00 1.00 6.00 W.O. 'L 25 P PJSA Service TDS-8.Hook.Block and Drawworks.
06:00 08:00 2.00 8.00 W.O. 'L 20 U PJSA Finnish cleaning Cannon Clamps for disposal.Prep dg floor for slick line operations.
08'00 11.00 3.00 11.00 W 0 i WR 20 U PJSM W/all parties.R/U Slickline for tubing punch run.
11 00 12:30 1.50 12.50 W O. R '15 U 'PJSA RIH W/Tubing Punch on Slickline to 1,360'SLM.Log up 4 collars F/1,360'to 1,223'SLM.Could not slack back down. '
P/U to 1,222'SLM and punch four 1/4"1'shot holes in tubing.LID Slicklion.
12:30 13.00 .0.50 13.00 W.O. L 20 U PJSM R/U and pump down 4.5"Tubing WI 9.7 ppg Brine at 2 bpm,240 PSI.1.5X Tubing capacity.
13:00 14.30 1:50 14.50 W.O. L i 4 'P -PJSM R/U POOH 4.5'Tubing,ESP and CAP line F/2,572'to 1,846'MD HST 98K.SIMOPS Took on.225'.bbl.9.9,ppg Brine to '
Pits.
14:30 15.00 0.50 15.00 W.0 L 9 'P PJSA Observe tubing full of Brine.R/U and pump 2 bpm,80 PSI,1.5X Tubing capacity W/9.7 ppg Bone.
15:00 15:30 0.50 15.50'W 0 'L 4 i P PJSA POOH 4.5"Tubing,ESP CAP line F/1,846'to 1,363'MD,HST 92K.LID Jnt 32 W/holes,JNT 55 and 52 bad.
15:30 i 19:30 4.00' 19.50'W 0 R 20 U PJSM WI all parties.Clean and clear rig floor.Prep for slickline.R/U Slickline.RIH WI Weight Bars to 997'SLM.POOH to
P/U Tubing Punch.
19:30 22:30 3.00' 22.50 W 0 R 20 U PJSM W/all parties.MIU SLB Tubing Punch and BHA.RIH to 1,037'SLM.Pull up hole 3 collars verify measurement.SLK off
to 1.000'SLM.Punch four 1/4"1'shot holes in tubing just above collar.POOH and R/D Slickline.
22:30 i 00:00 .1:501 24.00 W 0 L 9 U PJSA RAJ and pump down 4.5"Tubing @ 1 bpm,790 PSI 1 5X tubing volume WI 9.7 ppg Brine.Cont.to fill back side at 10
bph. iii
Daily Contacts
Position _ Contact Name Company Title Email Office Mobile
Eni representative Bruce Simonson ENI Drilling Supv. 907-685-0715
Eni representative Oliver Amend ENI Drilling Supv. 907-685-0715
Eni representative Mitch Billington ENI Drilling Supv/Clerk. akrigclerksdoyonl5@enipetroleum.com 907-685-0722
Eni representative Matt Smith ENI Matls Coordinator
Eni representative Paul Holley ENI HSE
Eni representative Jeremey Decker ENI Expediter eniexpeditor@gmail.com 907-980-7545 907-980-7545
Tool Push Justin Hays Doyon Tool Pusher
Tool Push Pete Martinusen Doyon Drilling =Tour Pusher rig15@doyondrilling.com 907-685-0716
Last Casing Seat
Cas.Type OD(in) ID(in) Grade Top(mKB) Bottom(mKB) TVD Bot.(mKB) Run Date
LINER 31/2 6,283:94 6,30113 1,189.13 5/3/2014
Well Name: SP05-FN7 OR Dally Report
Wellbore Name: SP05-FN
Well Code: 26944 •Date: 5/4/2016
• Report#: 8
n l', Job: WORKOVER Page:1 of 1
Well Header
Permit/Concession N° Operator Subsidiary Initial Lahee Code
SOUTH PASS 46(F.I.) ENI PETROLEUM ENI Petroleum Co.Inc. DEVELOPMENT WELL
Rotary Table Elevation(m) Water Depth(m) First Flange(m) RKB-Base.Flange(m) "RKB-Tubing Spool(m)
16.34 0.00 5.17 11.17 9.67
Rig Information
Rig Name - Contractor Rig Type Rig Num
RIG 15 DOYON LAND RIG 0723
Daily Information
Weather Temperature(°C) Wind Days LTI(days) Days RI(days) POB
Clouds -8.6 NNE @ 4 MPH 63.0
Daily Summary Operations
24h Forecast
Cont M/U Motor and Pump Assy.R/U ESP and CAP fines over sheave.R/U GBR Volant tool and Equip.RIH 4 5"Tubing,ESP and CAP lines as per Tally.
24h Summary
POOH 4:5"Tubing,ESP and CAP line F/1,365 to 475'MD.HST 85K.Rill and pump down tubing W/.9.7 ppg Brine at 0.5 bpm,800 PSI.9 bbls pumped.POOH F/475'to 375'MD.Found packed off with
sand/crude.R/U Vac truck and suck out tubing.Cont.to POOH Fl 353'to 114'MD.PJSM W/all parties.LID ESP Pump and Motor as per Baker Rep onsite.L/D 7"Shroud and Gas Dispersion Tube.R/D Vac truck
from rig floor.Remove all components,clamps and cables.Spool ESP and CAP lines to Spooler unit.Remove Elephant trunk and drain hose from ESP sheave.Clean and clear rig floor.Bring in 8 joints of 4 5"
Tubing to Pipe Shed.Drift and strap joints.Assist Baker bringing Pump Assy.into Pipe Shed.Prep for completion run.PJSM WI all parties.M/U Gas Dispersion Tube and 7"Shroud 88'MD.P/U M/U Motor,Seals,
Pump and DGU.Baker service motor and fill oil,check rotation all witnessed by Co Rep onsite.Continue filling 10 bph 9.5 ppg Brine.Total lost today 259 bbl.
Operation at 07.00
String up ESP and CAP lines over sheave.
Time Log
Start End Cum Dur
Time Time Dur(hr) (hr) Phase Opr. Act. Plan Oper.Descr.
00:00 02:00 2.00. 2.00 W.O. L 4 P PJSM POOH 4.5"Tubing,ESP and CAP line F/1,365'to 475'MD.HST 85K
02:00 03:00 1.00 3.00 W.O. L '9 P R/U and pump down tubing W/9.7 ppg Brine at 0.5 bpm,800 PSI.9 bbls pumped.
03:00 09:00 6.00 9.00 W 0 L '4 P POOH F1475'to 375 MD.Found packed off with sand/crude.R/U Vac truck and suck out tubing.Cont.to POOH Fl 353'to
114'MD.
09.00 12:00 3.00 12.00 W.O. L 20 P PJSM W/all parties.UD ESP Pump and Motor as per Baker Rep onsite.LID 7"Shroud and Gas Dispersion Tube.
12.00 16.30 4.50 16.50 W.O. K 20 P PJSM RID Vac truck from rig floor.Remove all components,clamps and cables.Spool ESP and CAP lines to Spooler unit.
Remove Elephant trunk and drain hose from ESP sheave.Clean and clear rig floor..Bring in 8 joints of 4.5"Tubing to Pipe
Shed.Drift and strap joints.
16:30 20:00 3.50 20.00 W.0. K 20 P PJSM Assist Baker bringing Pump Assy.into Pipe Shed Prep for completion run.
20:00 00:00 4.00 24.00 W.0 K 20 P - PJSM WI all parties.M/U Gas Dispersion Tube and 7"Shroud 86'MD.P/U Mill Motor,Seals,Pump and DGU.Baker service
motor and fill oil,check rotation all witnessed by Co Rep onsite,Continue filling 10 bph 9.5 ppg Brine.
Daily Contacts
Position Contact Name Company Title Email Office Mobile
Eni representative Bruce Simonson ENI Drilling Supv. 907-685-0715
Eni representative Oliver Amend ENI Drilling Supv. 907-685-0715
Eni representative Mitch Billington ENI Drilling Supv/Clerk. akrigclerksdoyonl5@enipetroleum.com 907-685-0722
Eni representative Matt Omit., - ,„, gm Malls Coordinator
Eni representative Paul Holf <nl�4lr�< ) HSE
Eni representative Jeremey Decker ENI Expediter eniexpeditor@gmail.com 907-980-7545 907-980-7545
Tool Push Justin Hays Doyon Tool Pusher
Tool Push Sean Tower Doyon Drilling ToolPusher
Last Casing Seat
Cas.Type OD(in) ID(in) Grade Top(mKB) Bottom(mKB) TVD Bot.(mKB) Run Date
LINER 31/2 6,283:94 ,6,601.13 1,18913 5/3/2014
trault* Well Name: SP05-FN7 ORill •Daily Report
Wellbore Name: SP05-FN
Well Code: 26944• Ret ort#a 9 16
2Page:Job: WORKOVER Rep
Date:
1 of 1
Well Header
Permit/Concession N° Operator Subsidiary =Initial Lahee Code
SOUTH PASS 46(F.I.) ENI PETROLEUM ENI Petroleum Co.Inc :DEVELOPMENT WELL
Rotary Table Elevation(m) Water Depth(m) First Flange(m) RKB-Base Flange(m) RKB-Tubing Spool(m)
16.34 0.00 5.17 11.17 9.67.
Rig Information
Rig Name - Contractor Rig Type : Rig Num
RIG 15 DOVON LAND RIG 0723
Daily Information
Weather Temperature(°C) Wind Days LTI(days) Days RI(days) POB
Clear -8.3 NNE @ 14 MPH 64 0.
Daily Summary Operations
24h Forecast
Cont.RIH 4.5"Tubing,ESP and CAP line F/7,028'to 8,000'MD.Swap out ESP spool and make splice.Cont.to RIH to 10,111'MD.M/U Hanger and terminate lines.Land Hanger and test ESP line.N/D.
24h Summary
PJSM Terminate MLE,CAP and Tech wires.Run pump down inside 7"Shroud and secure.M/U shroud hanger and secure to 7"Shroud section.Lower in hole to top of BGU 114'MD PJSM w/all parties.M/U
GBR Volant tool and Equip.String up ESP and CAP line over Derrick sheave to ng floor.M/U Joint#1 4.5"Tubing to top of DGU.Make splice to MLE to ESP as per Baker and ENI Electrician onsite:Perform test
on splice.RIH 4.5"Tubing,ESP and CAP line F/101'to 7,028'MD SLK 95K.Test ESP line every 500'.Cont.to pump 10 bbl per hour 9.3 ppg Brine down back side with no returns.Total loss today:240 bbl.
Operation at 07.00
Change out ESP spool in spooling unit and make splice.
Time Log
Start End Cum Dur
Time Time Dur(hr) (hr) Phase Opr. Act. Plan Oper.Descr.
00.00 02.00 2.00' 2.00 W.0. K 20 P-' PJSM Terminate MLE,CAP and Tech wires.Run pump down inside 7"Shroud and secure.M/U shroud hanger and secure
to 7"Shroud section.Lower in hole to top of BGU 114'MD.
02:00 03:30 1.50 3.50 W.O. K 20 P PJSM wl all parties M/U GBR Volant tool and Equip.String up ESP and CAP line over Derrick sheave to rig floor
03.30 . 08:00 4.50 8.00 W.O. K 20 P M/U Joint#1 4.5"Tubing to top of DGU.Make splice to MLE to ESP as per Baker and ENI Electrician onsite.Perform test on
splice
08'00 12:00 4.00 12.00 W.O. K 4 P PJSEA RIH 4.5"Tubing,ESP and CAP line F/101'to 1,507'.;MD.SLK 90K
12'00 '00:00 12.00 24.00 W . K 4 P PJSM W/all parties,RIH 4.5"Tubing,ESP,CAP line FI 1,507'to 7,028 MD Test ESP line every 500'.Cont to pump 10 bbl
per hour 9.3 ppg Brine down back side with no retums
Daily Contacts
Position _ Contact Name Company Title Email Office Mobile
Eni representative Bruce Simonson ENI Drilling Supv. 907-685-0715
Eni representative Oliver Amend ENI Drilling Supv. 907-685-0715
Eni representative Matt Smith ENI Matls Coordinator
Eni representative Paul Holley ENI HSE
Eni representative : Jeremey Decker ENI Expediter eniexpeditor@gmail.com 907-980-7545 907-980-7545
Tool Push Justin Hays Doyon Tool Pusher
Tool Push Sean Tower Doyon Drilling ToolPusher
Last Casing Seat
Cas.Type OD(in) ID(in) Grade Top(mKB) Bottom(mKB) TVD Bot.(mKB) Run Date
LINER 31/2 - 6,283.94 6,301 13 1,18913 5/3/2014
Well Name: SP05-FN7 OR. "'Daily Report
0Wellbore Name: SP05-FN?
Well Code: 26944 Date: 5/6/2016
• Report#: 10
2n Job: WORKOVER Page: 1 of 1
Well Header
Permit/Concession N° Operator Subsidiary Initial Lahee Code
SOUTH PASS 46(F.I.) ENI PETROLEUM EM Petroleum Co.Inc. DEVELOPMENT WELL
Rotary Table Elevation(m) Water Depth(m) First Flange(m) RKB-Base Flange(m) RKB-Tubing Spool(m)
16.34 0.00 5.17 11.17 9.67. _.
Rig Information
Rig Name Contractor Rig Type Rig Num
RIG 15 DOYON LAND RIG 0723
Daily Information
Weather Temperature(°C) Wind Days LTI(days) Days RI(days) POB
Clouds -8.4 N @ 9 MPH .60.0.
Daily Summary Operations
24h Forecast
Finish flushing lines to Stack and Vac out Stack.Remove Pipe Rams and N/D.N/U and test Tree to 5,000 PSI.Baker check pump connections.Start Rig move.
24h Summary
RIH 4.5"Tubing,ESP and CAP Fl 7,028'to 7,846'MD.PJSM W/all parties.Change out ESP spool in Spool Unit,Prep for spool to spool splice.Test new spool as per Baker Rep.SIMOPS Bring Hanger to rig
floor.RIH 4.5"Tubing,ESP and CAP line Fl 7,846'to 8,135'MD.Make up Gator Splice to ESP cable WI Baker and ENI Electrician onsite.RIH 4.5"Tubing,ESP and CAP line Fl 8,135'to 10,067'MD.SLK 85K.
Cont.testing ESP cable every 1,000'MD.M/U Hanger and orientate as per Vetco Rep onsite.M/U Hanger splice and Penetrator as per Baker Rep onsite.PJSM Land Hanger,4 5"Tubing at 10,111'MD.Vetco
verify Hanger landed and RILDS.Test upper and lower seals to 5,000 PSI for 10 Min.witnessed by Co Rep onsite.RID Baker and GBR tools and Equip.Clean and clear ng floor.Kick out extra tubing and used
GLM from Pipe Shed.Clean drip pan.Fill Pit 5 with 130 bbl heated water WI Deep Clean for flushing Equip.R/U for flushing Stack,Pumps and lines.Flush Stack and Mud Pump#2 Blow down TDS-8 and R/D
stack washer.Flush test line on Choke Manifold to Tiger Tank,flush secondary kill line to Tiger Tank.
Operation at 07.00
N/D BOPE
Time Log
Start End Cum Dur
Time Time Dur(hr) (hr) Phase Opr. Act. Plan Oper.Descr.
00:00 02:00 2.00 . -2.00 W.0," K 4 P PJSM RIH 4.5"Tubing,ESP and CAP F/7,028'10 7,846'MD.SLK 93K
02:00 04.00 2.00 4.00 W.O. K 20 P PJSM W/all parties.Change out ESP spool in Spool Unit Prep for spool to spool splice.Test newspool as per Baker Rep.
SIMOPS Bring Hanger to rig floor.
0400 05:00 - 1.00 5.00 W.O. K 4 P PJSA RIH 4.5"Tubing,ESP and CAP line Fl 7,846'to 8,135'MD.SLK 93K
05:00 06:.30 1.50 6.50 W.O. K - '20 P PJSA Make up Gator..Splice to ESP cable WI Baker and ENI Electrician onsite.
D6:30 10130 4.00 10.50 W . K '4 P PJSA RIH 4 5"Tubing,ESP and CAP line F/8,135'to 10,067'MD.SLK 85K.Cont.testing ESP cable every 1,000'MD.
10:30 12:00 1.50 12.00 W.O. K 20 P PJSA M/U Hanger and orientate as per Vetco Rep onsite.Mill Hanger splice and Penetrator as per Baker Rep onsite,
12:00 13:00 1:00 13.00 W.O. C 20 P PJSM Land Hanger,4.5"Tubing at 10,111'MD.Vetco verify Hanger landed and RILDS.Test upper and lower seals to 5,000
PSI for 10 Min.witnessed by Co Rep onsite.
13:00 20:00 7.00 20.00 W.O. K 20 P -PJSM RID Baker and GBR tools and Equip.Clean and clear ng floor.Kick out extra tubing.and.used GLM from Pipe Shed.
Clean drip pan.
20.00 21:30 :1;50 21.50 W.O. K 20 P 'PJSA Fill Pit 5 with 130 bbl heated water WI Deep Clean for flushing Equip.R/U for flushing Stack,Pumps and lines.
21.30 00:00 2:50 24.00 W 0 K 20 P PJSA Flush Stack and Mud Pump#2 Blow down TDS-8 and R/D stack washer.Flush test line on Choke Manifold to Tiger
Tank,:flush secondary kill line to Tiger Tank.
Daily Contacts
Position Contact Name Company Title Email Office Mobile
Eni representative Bruce Simonson ENI Drilling Supv. 907-685-0715
Eni representative Oliver Amend 0911 ,., I Drilling Supv. 907-685-0715
Eni representative Matt.Smith , ,fi Malls Coordinator
Eni representative Paul.Holley � HSE
Eni representative Jeremey Decker b' 4 Expediter eniexpeditor@gmail.com 907-980-7545 907-980-7545
Tool Push Justin Hays Doyon '. Tool Pusher
Tool Push Sean Tower Doyon Drilling (II ToolPusher
Last Casing Seat
Cas.Type OD(in) ID(in) Grade Top(mKB) Bottom(mKB) TVD Bot.(mKB) Run Date
LINER 31/2 6,283.94 6,30113 1,18913 5/3/2014
Well Name: SP05-FN7 OHIO •Dally Report
Wellbore Name: SP05-FN7
Well Code: 26944 Date: 5/7/2016
Job: WORKOVER Report#: 11
Page:1 of 1
Well Header
Permit/Concession N° Operator Subsidiary Initial Lahee Code
SOUTH PASS 46(F.I.) ENI PETROLEUM ENI Petroleum Co.Inc. DEVELOPMENT WELL
Rotary Table Elevation(m) Water Depth(m) First Flange(m) RKB-Base Flange(m) RKB-Tubing Spool(m)
16.34 0.00 5.17 11:17 9.67
Rig Information
Rig Name - Contractor Rig Type Rig Num
RIG 15 DOYON LAND RIG 0723
Daily Information
Weather Temperature("C) Wind Days LTI(days) Days RI(days) POB
Clouds -7.3 NNE @ 13 MPH 58.0
Daily Summary Operations
24h Forecast
Prep for cold stacking rig.
24h Summary
Blow down Tiger Tank lines,Choke and Kill lines.Remove 3.5"X 6"Variable Rams,4"X 6"Variable Rams from BOPE for stack out.SIMOPS Remove Tiger Tank lines.N/D BOPE and high Press.riser.Rack
back and secure BOPE.Prep Well Head.N/U Tree,test void to 5,000 PSI for 10 Min,pull BPV as per Vetco Rep onsite.R/U to test Tree.Test Tree 500 PSI low and 5,000 PSI high for 5 Min all on chart.
Witnessed by Vetco and Co Rep onsite.Baker check Penetrator.Vetco Grey pull TWC.Clean Pits,install drain hoses for rig floor drip pan.Clean rig floor and flush Pumps#1&2.Rig released at 12:00.Clean
and clear subs from rig floor.Clean pits.Begin breaking down MP#1.Prep accumulator for shut down.Remove monitor and receiver from spooling unit.Gather up Witchita brake parts and tools for rebuild.
Remove fluids and clean Rock Washer.Paint sub rack
Operation at 07.00
Cont.cold stack operations.
Time Log
Start End Cum Dur
Time Time Dur(hr) (hr) Phase Opr. Act. Plan Oper.Descr.
00:00. 00:30 0:50 0.50 W.0. 'K 20 P 'PJSM Blow down Tiger Tank lines,Choke and Kill lines..
00:30 04.00 3.50' 4.00 W.O.. 'C 5 P 'PJSM Remove 3 5"X 6"Variable Rams,4"X 6"Variable Rams from BOPE for stack out.SIMOPS Remove Tiger Tank lines.
04:00 05.30 1.50 5.50 W.O. C 5 P PJSM N/D BOPE and high Press.riser.Rack back and secure BOPE..
05:30 '07:00 1.50 7.00 W.O. 'C '5 P PJSM Prep Well Head.N/U Tree,test void to 5,000 PSI for 10 Min,pull BPV as per Vetco Rep onsite.
07.00 08:30 1.50 8.50 W.O.ci C 12 'P PJSM R/U to test Tree.Test Tree 500 PSI low and 5,000 PSI high for 5 Min all on chart.Witnessed by Vetco and Co Rep
onsite.
08:30 05 30 1.00' 9.50 W 0 'C '5 'P 'PJSM Baker check Penetrator.Vetco Grey pull TWO
09:30 12:00 2.50 12.00 W 0 K 20 P PJSM Clean Pits,install drain hoses for rig floor drip pan.Clean rig floor and.flush Pumps#1&2.Rig released at 12:00.
12:00 00:00 12.00 24.00 W.O. A 2 P PJSM Clean and clear subs from rig floor.Clean pits.Begin breaking down.MP#1 Prep accumulator for shut down.Remove
monitor and receiver from spooling unit.Gather up Witchita brakeparts and tools for rebuild.Remove fluids and clean Rock
Washer.Paint sub rack.
Daily Contacts
Position _ Contact Name Company Title Email Office Mobile
Eni representative Bruce Simonson ENI Drilling Supv. 907-685-0715
Eni representative Oliver Amend ENI Drilling Supv. 907-685-0715
Eni representative Matt Smith ENI Malls Coordinator
Eni representative Paul Holley ENI HSE
Eni representative Jeremey Decker ENI Expediter eniexpeditor@gmail.com 907-980-7545 907-980-7545
Tool Push Justin Hays Doyon Tool Pusher
Tool Push: Sean Tower Doyon Drilling ToolPusher
Last Casing Seat
Cas.Type OD(in) ID(in) Grade Top(mKB) Bottom(mKB) TVD Bot.(mKB) Run Date
LINER 31/2 6,283.94 16,301.13 1,189.13 5/3/2014
Well Name: SP05-FN7 OR Dail Report
Wellbore Name: SP05-FN Y
Well Code: 26944
• Date:
5/8/2016
6
Report#: 12
Job: WORKOVERnPage:
1 of 1
Well Header
Permit/Concession N° Operator Subsidiary Initial Lahee Code
SOUTH PASS 46(El.) EM PETROLEUM ENI Petroleum Co.Inc. DEVELOPMENT WELL
Rotary Table Elevation(m) Water Depth(m) First Flange(m) RKB-Base Flange(m) RKB-Tubing Spool(m)
16.34 0.00 5.17 11.17 9.67
Rig Information
Rig Name Contractor Rig Type Rig Num
RIG 15 DOYON LAND RIG 0723
Daily Information
Weather Temperature(°C) Wind Days LTI(days) Days RI(days) POB
Clouds -5.9 E @ 13 MPH 54.0
Daily Summary Operations
24h Forecast
Cont.prep rig for cold stack.
24h Summary
Clean under pipe racks,driller console,mats and under Skate extension on rig floor.Clean and remove Equipfrom rig floor.Clean in pit room.Remove suction and discharge seats from MP#1 Blow down coolant
lines from IDS Brake System..Start removal of swabs,liners and sub rods from MP#1.Clean out Choke house,tool corner and under IDS Brake on rig floor.Press.wash Drawworks.Remove ng floor mats.Clean
Pits.Press.wash drip pan.Clean rig floor.Start cleaning and organizing in Mezzine/Cellar area.Cleaning and organize Pipe Shed.Install and test new hand held gas monitor station.Inventory all Subs and X/O's.
Blind off Shaker in Rock Washer to eliminate fluid going on to Pits.Disconnect and plug/Cap IDS roof hoses.Grease Crown sheave and coat shaft W/LPS 3.Remove Angel Flight from Derrick.Finished cleaning
Pits.Performed Stabbing Board/Derrick inspection.Cont.cleaning Rock Washer Pits.Clean and organize Mezz and cellar.Break down.MP#1.Install Top-Drive rail stops.
Operation at 07.00
Cont.cold stack operations.
Time Log
Start End Cum Dur
Time Time Dur(hr) (hr) Phase Opr. Act. Plan Oper.Descr.
00:00 12:00 12100 12.00 W.O. A 1 P PJSM Clean under pipe racks,driller console,mats and under Skate extension on rig floor.Clean and remove Equip.from rig
floor.Clean in pit room.Remove suction and discharge seats from MP#1.Blow downcoolant lines from IDS brake System.
Start removal of swabs,liners and sub rods from MP#1.Clean out Choke house,tool corner and under IDS Brake on rig
floor.Press.wash Drawworks.Remove rig floor mats.Clean Pits.Press.wash drip pan.Clean rig floor.Start cleaning and.
organizing in Mezzine/Cellar area.Cleaning and organize Pipe Shed.Install andtest new hand held gas monitor station.
Inventory all Subs and X/O's.
12:00 00:0012.00 24.00 W.O. A1 P PJSM Cont.Presswashing and organize Mezzine/Cellar area.Blind off Shaker in Rock Washer to eliminate fluid going on
to Pits.Disconnect and plug/Cap IDS roof hoses.Grease Crown sheave and coat shaft W/LPS 3.Remove Angel Flight from
Derrick.Finished cleaning Pits.Performed Stabbing Board/Dernck'.inspection.Cost.cleaning Rock Washer Pits.Cleanand
organize Mezz and cellar.Break down MP#1.Install.Top-Drive rail stops.
Daily Contacts
Position Contact Name Company Title Email Office Mobile
Eni representative Bruce Simonson ENI Drilling Supv. 907-685-0715
Ent representative Oliver Amend ENI Drilling Supv. 907-685-0715
Eni representative Russ Wimmer ENI Drilling Supv. SIDDrilling@enipetroleum.com 907-685-0715 907-320-0058
Eni representative Matt Smith ENI Malls Coordinator
Eni representative Paul Holley ENI HSE
Eni representative Jeremey Decker ENI Expediter eniexpeditor@gmail.com 907-980-7545 907-980-7545
Tool Push Justin Hays Doyon Tool Pusher
Tool Push Sean Tower Doyon Drilling ToolPusher
Last Casing Seat
Cas.Type OD(in) ID(in) Grade Top(mKB) Bottom(mKB) TVD Bot.(mKB) Run Date
LINER 31/2 6,283.94 6,301.13. 118913 513/2014 °,
.iii Well Name: SP05-FN7 O
"'Daily Report
Wellbore Name: SP05-FN
Well Code: 26944 Date: 5/9/2016
2n P
Job: WORKOVER Page:
#: 13
Page:1 of 1
Well Header
Permit/Concession N° Operator Subsidiary Initial Lahee Code
SOUTH PASS 46(F.l.) ENI PETROLEUM ENI Petroleum Co.Inc. DEVELOPMENT WELL
Rotary Table Elevation(m) Water Depth(m) First Flange(m) RKB-Base Flange(m) RKB-Tubing Spool(m)
16.34 0.00 5.17 11 17 9.67
Rig Information
Rig Name Contractor Rig Type Rig Num
RIG 15 DOYON LAND RIG 0723
Daily Information
Weather Temperature(CC) Wind Days LTI(days) Days RI(days) POB
Clouds -6.2 E@ 11 MPH 53.0
Daily Summary Operations
24h Forecast
Continue with cleaning,organizing and rig down procedures as per plan.
24h Summary
Cleaning,organizing and following rig down!stack out procedures.
Operation at 07.00
RID and stack out procedures.
Time Log
Start End Cum Our
Time Time Dur(hr) (hr) Phase Opr. _ Act. Plan Oper.Descr.
00.00 12'00 12.00 12.00 W O A 1 P PJSM Continue cleaning Mezz,cellar,pipe shed and rock washer.RID MP#2,remove brushes f/MP#1/#2 Clean and
I,. organize Mud Pit area.Complete ST-80 stack out.Remove all 1502 equipment from mud and choke manifold.Grease choke
manifold and all fittings.
12.00 00.00 12.00 24.00 W.O.. A 1 P PJSM Cost cleaning,organizing,wipe walls and equipment.Doping XO's and install on rack.Gather cordless tool batteries
and store.Work on Audible alarm system.Fabricating ladder rack.Mech finish testing stomper cylinder rebuild.Blind off IDS
glycol tank.Inspect auger bearings in pits and rock washer Drain centnfugal pumps.
Daily Contacts
Position Contact Name Company _ Title Email Office Mobile
Em representative Oliver Amend ENI Drilling Supv. 907-685-0715
Eni representative Russ Wimmer ENI Drilling Supv. SIDDrilling@enipetroleum.com 907-685-0715 907-320-0058
Eni representative Matt Smith ENI Malls Coordinator
Eni representative Paul Holley ENI HSE
Eni representative Jeremey Decker ENI Expediter eniexpeditor@gmail.com 907-980-7545 907-980-7545
Tool Push Justin Hays Doyon Tool Pusher
Tool Push Sean Tower Doyon Drilling ToolPusher
Last Casing Seat
Cas.Type OD(in) ID(in) Grade Top(mKB) Bottom(mKB) ND Bot.(mKB) Run Date
LINER 31/2 6,283.94 6,301.13 199913 5/3(2014
�-riirl Well Name: SP05-FN7 O
Wellbore Name: SP05-FA Daily Report
Well Code: 26944 Date: 5/10/2016
2 n Job: WORKOVER Report#: 14
Page:1 of 1
Well Header
Permit/Concession N° Operator Subsidiary Initial Lahee Code
SOUTH PASS 46(F.I.) ENI PETROLEUM ENI Petroleum Co.Inc DEVELOPMENT WELL
Rotary Table Elevation(m) Water Depth(m) First Flange(m) RKB-Base Flange(m) RKB-Tubing Spool(m)
16.34 0.00 5.17 11.17 9.67
Rig Information
Rig Name Contractor Rig Type Rig Num
RIG 15 DOYON LAND RIG 0723
Daily Information
Weather Temperature(CC) Wind Days LTI(days) Days RI(days) POE
Overcast -0.4 E @ 19 MPH 50.0
Daily Summary Operations
24h Forecast
Continue with rig down procedures.
24h Summary
Cold Stack Report#3.Cleaning cellar,rig floor and pipe shed.Store hi-pressure hoses.Bring stomper ram into Mezz.and install on Drill side.Dismantle MP#2.Break down berming to Tiger Tank.MT rock washer
pit#1,gray water and cutting tanks.Prep and painting ng floor.Remove 1502 fittings from rock washer and well bay,clean and grease.Remove well bay Gaitronics.Add air oil to console,super choke and
function.Store chart recorder.Bleed down Koomey bottles to 15 psi and prep for stack out.Reroute load cylinder cable.Install auger shoot in rock washer.Drain test pump and tank.Service derrick board mule
and cable.Clean and service auger gear reduction box.
Operation at 07.00
Rig down/stack out procedures.
Time Log
Start End Cum Dur
Time Time Dur(hr) (hr) Phase Opr. Act. Plan °per.Descr.
00:00 12:00 12.00 12.00 W.O. A1 P PJSM Cleaning cellar,ng floor and pipe shed.Store hi-pressure hoses Bring stomper ram into Mezz and install on Drill side
Dismantle MP#2 Break down berming to Tiger Tank.MT rock washer pit#1,gray water and cutting tanks.
12:00 00.00 12.00 24.00 W 0 A 1 P PJSM Prep and painting rig floor.Remove 1502 fittings from rock washer and well bay;clean and grease.Remove well bay
Gaitronics.Add air oil to console,super choke and function.Store chart recorder.Bleed down Koomey bottles to 15 psi and
prep for stack out.Reroute load cylinder cable.Install auger shoot in rock washer.Drain test pump and tank.Service derrick
board mule and cable.Clean and service auger gear reduction box.
Daily Contacts
Position Contact Name Company Title Email Office Mobile
Eni representative Oliver Amend ENI - Drilling Supv. 907-685-0715
Eni representative Russ Wimmer ENI Drilling Supv. SIDDrilling@enipetroleum.com 907-685-0715 907-320-0058
Eni representative Mitch Billington ENI Drilling Supv/Clerk. akrigclerksdoyon15@enipetroleum.com 907-685-0722
Eni representative Matt Smith ENI Malls Coordinator
Eni representative Paul Holley ENI HSE
Eni representative Jeremey Decker ENI Expediter eniexpeditor@gmail.com 907-980-7545 907-980-7545
Tool Push Justin Hays Doyon Tool Pusher
Tool Push Sean Tower Doyon Drilling. ToolPusher
Last Casing Seat
Cas.Type OD(in) ID(in) Grade Top(mKB) Bottom(mKB) TVD Bot.(mKB) Run Date
LINER 31)2 6,283.94 6,30.113; 1,189.13 81.3g9:14....:21,. ,
040.1ifii* Well Name: SP05-FN7 O "'Daily Report
Wellbore Name: SP05-FN
Well Code: 26944 Date: 5/11/2016
• Report#: 15
2 n n Job: WORKOVER Page:1 of 1
Well Header
Permit/Concession N" Operator Subsidiary Initial Lahee Code
SOUTH PASS 46(F.I.) EM PETROLEUM EM Petroleum Co.Inc_ DEVELOPMENT WELL
Rotary Table Elevation(m) Water Depth(m) First Flange(m) RKB-Base Flange(m) RKB-Tubing Spool(in)
16.34 0.00 5.17 11.17 9.67
Rig Information
Rig Name Contractor Rig Type Rig Num
RIG 15 DOYON LAND RIG 0723
Daily Information
Weather Temperature(°C) Wind Days LTI(days) Days RI(days) POB
' Mostly Cloudy 5.9 Calm 50,0
Daily Summary Operations
24h Forecast
Continue with rig down procedures.
24h Summary
Cold Stack Report#4.PJSM Clean,prep and painting rig floor,pipe shed and and pump room.Spray LPS3 on pump parts.Complete rerouting load cylinder electric cable and MP#1 stackout.Organize
outside of rig,cleaning and organizing shop.Remove choke hoses from roof and prep for stackout.Break apart interconnect.Shut in boiler#2,draun Cat#1 glycol,place MP#3 hoses up off ground.
Operation at 07.00
Rig Down/Stack Out Procedures.
Time Log
Start End Cum Dur
Time Time Dur(hr) (hr) Phase Opr. Act. Plan Oper.Descr.
00.00 i 12:00 12.00 12.00 W.O. A 1 P PJSM Clean,prep and painting rig floor,pipe shed and pump room.Spray LPS3 on pump caps,liners,seats and seat
recepticals.
12'00 00:00 12.00 24.00 W.O. A 1 P PJSM Cont.with painting projects.Complete rerouting load cylinder electric cable,MP#1 stackout.Organize outsideof
rig,cleaning and organizing shop.Remove choke hoses from roof and prep for stackout.Break apart inner connect,Shut in
Boiler#2,drain glycol from Cat#1,place MP#3 hoses up from ground.
Daily Contacts
Position Contact Name Company Title Email Office Mobile
Eni representative Oliver Amend l'ENI Drilling Supv. 907-685-0715
Eni representative Russ Wimmer ENI Drilling Supv. SIDDrilling@enipetroleum.com 907-685-0715 907-320-0058
Eni representative Mitch Billington ENI Drilling Supv/Clerk. akrigclerksdoyonl5@enipetroleum.com 907-685-0722
Eni representative Matt Smith. ENI Malls Coordinator
Eni representative Paul Holley ENI HSE
Eni representative Greg Parker ENI I'.Expediter 907-980-7545
Tool Push Chad Johnson Doyon Drilling Tool Pusher rig15@doyondrilling.com 907-685-0716
Tool Push Sean Tower Doyon Drilling ToolPusher
Last Casing Seat
Cas.Type OD(in) ID(in) Grade Top(mKB) Bottom(mKB) TVD Bot.(mKB) Run Date
LINER ,3112 6,283.94 6,3013 1,16913'..5/3/2014
14 Well Name: SP05-FN7 0R� .Daily Report
Wellbore Name: SP05-FN
• Well Code: 26944 Re ort#: 16 16
e n 0 Job: WORKOVERP
Page:1 of 1
Well Header
' Permit/Concession N° Operator Subsidiary Initial Lahee Code
SOUTH PASS 46(F:I.) ENI PETROLEUM ENI Petroleum Co.Inc. DEVELOPMENT WELL
Rotary Table Elevation(m) Water Depth(m) First Flange(m) RKB-Base Flange(m) RKB-Tubing Spool(m)
16.34 0.00 5.17 11.17 9.67
Rig Information
Rig Name Contractor Rig Type Rig Num
RIG 15 DOYON LAND RIG 0723
Daily Information
Weather Temperature(°C) Wind Days LTI(days) Days RI(days) POB
Overcast 1.8 NE @ 6 MPH : 50.0
Daily Summary Operations
24h Forecast
Cont..w/Rig Down Procedures.
24h Summary
Cold Stack Report#5.Cont.w/painting,reorganizing drilling tools back to rig floor.Clean,prep,lay matts and spot Rock Washer on Stack Out Area.Berm in place.BID water and steam,clean tanks,pits and
boxes.R/D and prep to skid rig floor.Assemble frame for IDS brake removal and repairs.Service,maintain and repair rig components as needed,ex,flow control valves on skate buggy.Secunng areas for stack
out.Remove elevators,bails and store.Store cuttings box and loader stacking DP at corner of location.Freeze protect equipment and add corrosion inhibitor to equipment.Cover outside vents.
Operation at 07.00
Rig Down/Stack Out Procedures.
Time Log
Start End Cum Dur
Time Time Dur(hr) (hr) Phase Opr. Act. Plan Oper.Descr.
00:00 12:00 12.00 12.00 W 0 A 1 P PJSM Cont.painting projects,remove drip pan drains and SLR's.Drain pressure washer tank for sub,complete draining#1
motor glycol.Remove DS suit case lines,LPS 3 equipment,remove all caps from lines,open valves.Drain cellar box,8/D
lines and remove cover and plumbing.B/D water and suck out sumps in pump room.R/D ng floor interconnects,remove flow
line dresser sleeve.B/D steam to rock washer,clean pits and auger.Clean out cuttings tank and vac tank.Bring painted sub
rack to ng floor and load vv/subs and XO's.Move Rock Washer f/pit complex,lay out matt boards and turn subtires to
moving position.Bong glycol drums to ng floor.Remove covers from IDS brake,remove gauges from driller console and
choke house.Bring IDS stand to ng floor.
12:00 00:00 12.00 24.00 W 0 A t P PJSM Lay matts,spread herculite--and spot Rock Washer,secure and berm.Spray shakers,mud cleaner and auger wI light
oil.Install flow control valves for skate buggy.Cover MP#3 inner connect opening.Assemble IDS frame for rebuild and.bring
parts to rig floor.Remove elevators and store in parts house,remove bails and store on rack.Move cuttings box to storage,
cover roof vents on pits.Add anticorrosion to TD gear box.Freeze protect power washers.Install auger box weather proofing
on.pits.Loader stacking DP into comer.
Daily Contacts
Position Contact Name Company Title Email Office Mobile
Eni representative Oliver Amend ENI Drilling Supv. - 907-685-0715
Eni representative Russ Wimmer ENI Drilling Supv. SIDDrilling@enipetroleum.cow 907-685-0715 907-320-0058
Eni representative Mitch.Billington ENI Drilling Supv/Clerk. akrigclerksdoyon15@enipetroleum.corn 907-685-0722
Eni representative Matt Smith ENI Malls Coordinator
Eni representative Troy England ENI HSE
Eni representative Greg Parker ENI Expediter 907-980-7545
Tool Push: Chad Johnson. Doyon Drilling Tool Pusher rig15@doyondrilling.com 907-685-0716
Tool Push i Sean Tower Doyon Drilling ToolPusher
Last Casing Seat
Cas.Type OD(in) ID(in) Grade Top(mKB) Bottom(mKB) TVD Bot.(mKB) Run Date
LINER litii 31/2 6,283 94 6,30113 1,189.13 5/3/2014
Well Name: SP05-FN7 O Dail Report
Wellbore Name: SP05-FN • Y p
Well Code: 26944• Retp ort#:3/1 016
cz II II
n Job: WORKOVER
11 Page:e:1 of 1
�
Well Header
Permit/Concession N° Operator :Subsidiary Initial Lahee Code
SOUTH PASS 46(F.t.) ENI PETROLEUM ENI Petroleum Co.Inc DEVELOPMENT WELL
Rotary Table Elevation(m) Water Depth(m) First Flange(m) RKB-Base Flange(m) RKB-Tubing Spool(m)
16.34 0.00 5.17 11.17 9.67
Rig Information
Rig Name Contractor Rig Type Rig Num ,
RIG 55 DOYON LAND RIG 0723 "(lE
Daily Information
Weather Temperature(°C) Wind Days LTI(days) Days RI(days) POB.
Clear 1.7 SW @ 18 MPH 47.0
Daily Summary Operations
24h Forecast
Cool w/Rig Down Procedures.
24h Summary
Cold Stack Report#6
PJSM Remove Saver Sub,lower and upper IBOP from TDS-8.Blow down and drain boiler.Stack 4.5"D.P in yard.Open up boiler clean and inspect.Service TDS-8 and Blocks.LPS3 all polish rods,sheave and
swivel packing.Start repair on Witchita Brake.LPS3 brake linkage for Drawworks.Service Drawworks.Check moving system tire Press.Block air intake to Mud Pumps.PJSM,cont removing friction brakes from
witichita brake system for repair,cable coat bridge crane lines and drum,clean pit#5,clean and grease lower BOP riser flange,kill I choke line flanges for stack out rig water tank,cont disk removal on brake
system,clean pit#2,shut dn boiler#1 for cool dn,blow dn water lines,blow dnsteam system,set mats for turning pit complex,prep and skid rig floor,prep for moving pit to turn around.
Operation at 07.00
Rig Down!Stack Out Procedures.
Time Log
Start End Cum Dur
' Time Time Dur(hr) (hr) Phase _ Opr. Act. _ Plan Oper.Descr.
00.00 12:00 - 1200 12.00 W.O. A 1 P PJSM Remove Saver Sub,lower and upper IBOP from TDS-8 Slowdown and drain boiler.Stack 4.5"D.P in yard.Open up
boiler clean and inspect.Service TDS-8 and Blocks.LPS3 all polish rods.sheave andswivel packing.Start repair on Witchita
Brake LPS3 brake linkage for Drawworks.Service Draw-works.Check moving system tire Press,Block air intake to Mud
Pumps
12.00 00.00 -1200 24.00 W 0 A1 t P PJSM,cont removing friction brakes from witichita brake system for repair,cable coat bridge crane lines and drum,clean pit
#5,clean and grease lower BOP riser flange,kill/choke line flanges for stack outdrain rig water tank,cont disk removal on
brake system,clean pit#2,shut dn boiler#1 for cool dn,blow do waterlines,blow do steam system set mats for turning pit
complex,prep andskid rig floor,prep for moving pit to turn around.
Daily Contacts
Position Contact Name Company Title Email Office Mobile
Eni representative Oliver Amend 'ENI Drilling Supv. 907-685-0715
Eni representative Mitch Billington ENI Drilling Supv/Clerk. akrigclerksdoyon15@enipetroleum.com 907-685-0722
Eni representative Troy England ENI HSE
Eni representative Greg Parker ENI Expediter 907-980-7545
Tool Push Chad Johnson Doyon Drilling Tool Pusher rig15@doyondrilling.corn 907-685-0716
Tool Push Sean Tower Doyon Drilling ToolPusher
Last Casing Seat
Cas.Type OD(in) ID(in) Grade Top(mKB) Bottom(mKB) TVD Bot.(mKB) Run Date
LINER 31/2 n _ 6,283.94 6,301 13 1,18913 5/3/2014
Well Name: SP05-FN7 ORR� ill Daily Report
Wellbore Name: SP05-FN
Well Code: 26944 Date: 5114/2016
r� ! Job: WORKOVER Report#: 18
�n�!' 1 Page: of 1
Well Header
Permit/Concession N° Operator Subsidiary - Initial Lahee Code
SOUTH PASS 46(F.I.) ENI PETROLEUM ENI Petroleum Co.Inc. DEVELOPMENT WELL
Rotary Table Elevation(m) Water Depth(m) First Flange(m) RKB-Base Flange(m) RKB-Tubing Spool(m)
16.34 0.00 5.17 11.17 9.67
Rig Information
Rig Name - Contractor : (Rig Type Rig Num
RIG.15 DOYON LAND RIG - 0723
Daily Information
Weather Temperature(°C) Wind Days LTI(days) Days RI(days) POB
Overcast -0.5 N @ 5 MPH 47.0
Daily Summary Operations
24h Forecast
Cont.w/Rig Down Procedures.
24h Summary
Cold Stack Report#7
PJSM Move and turn Pits Complex and Sub Module.Spot onwest side of pad.Move Mats and Herculite off SP05-FN7.Level pad,lay Herculite and Mats for cold stack position.Transition for moving modules.
Work on Witchita brake system.Move Sub module and Pit complex into cold stack position.Pick up and stack unused Mats.Canrig disconnect Equip.on ng floor.Finish moving pit complex in to stack out position,
cont repairs on witchita brake system,weld hurculite extension for rig mat placement,begin berming on drillers side and rear of rig,cover pits exhaust fan discharge,cap poor boy degasser stack,dispose of worn
out herculite,spot hot shack under cellar,stage stomper feet under cellar,tear do temp manifold building landing and remove suit cases,inspect and lub demco valves in pump rm.
Operation at 07.00
Rig Down/Stack Out Procedures.
Time Log
Start End Cum Dur
Time Time Our(hr) (hr) Phase Opr. Act. Plan Oper.Descr.
0000 12:00 12.00 12.00 W.O.. A 2 P PJSM Move and turn Pits Complex and Sub Module.Spot on west side of pad.Move Matts and Herculite off SP05-FN7.
Level pad,lay Herculite and Malts for cold stack position.Transition for moving modules.Work on Witchita brake system.
Move Sub module and Pit complex into cold stack position.Pick up and stack unused Matts.Canrig disconnect Equip on.rig
12'00 00:00 12.00 24.00 W 0 A 2 'P Finish moving pit complex in to stack out position,cont repairs on witchita brake system,weld hurculite extension for rig mat
placement,begin berming on drillers side.and rear of rig,coverpits exhaust fan discharge,cap poor boy degasser stack,
dispose of worn out herculite,spot hot shack under cellar,stage stomper feet under cellar,tear do temp manifold building
landing and remove suit cases.inspect and lub demco valves in pump rm
Daily Contacts
Position Contact Name Company Title Email Office Mobile
Eni representative Oliver Amend 'ENI Drilling Supv. 907-685-0715
Eni:representative Mitch Billington ENI Drilling Supv/Clerk. akrigclerksdoyonl5@enipetroleum.com 907-685-0722
Eni.representative Troy England ENI HSE
Eni representative Greg Parker ENI Expediter 907-980-7545
Tool Push Chad Johnson Doyon Drilling Tool Pusher rig15@doyondrilling.com 907-685-0716
Tool Push Sean Tower Doyon Drilling ToolPusher
Last Casing Seat
Cas.Type OD(in) ID(in) Grade Top(mKB) Bottom(mKB) TVD Bot.(mKB) Run Date
'
LINER 31/2 6,283.94 .6,3.0193 1,189.13 513/2014
A, Well Name: SP05-FN7 OR� .Daily Report
Wellbore Name: SP05-FN
Well Code: 26944 Date: 5/15/2016
Job: WORKOVER Report#: 19
1
Page: of 1
Well Header
Permit/Concession N° Operator Subsidiary Initial Lahee Code
SOUTH PASS 46(F.I.) ENI PETROLEUM ENI Petroleum Co.Inc DEVELOPMENT WELL
Rotary Table Elevation(m) Water Depth(m) First Flange(m) RKB-Base Flange(m) 'RKB-Tubing Spool(m)
16.34 0.00 5.17 11.17 9.67
Rig Information
Rig Name Contractor Rig Type Rig Num
RIG 15 DOYON LAND RIG 0723
Daily Information
Weather Temperature(°C) Wind Days LTI(days) Days RI(days) POB
Overcast -1.7 NNE @ 27 MPH 47.0
Daily Summary Operations
24h Forecast
Cont.WI Rig Down Procedures.
24h Summary
Cold Stack Report#8
PJSM Spray LPS3 on moving system polish rods.Coil shop Gai-tronics cable and free power cable from ice.Stack Mats in yard.Cap off drillers side suit case to valve house,Gather tools and string out stomper
cables,Install gauge on stomper cylinder.Service sheaves in Pipe Shed doors and cable coat lines.Remove life lines from Pipe Shed.Install stomper beams with CH2M crane.Remove batteries and shut down
brain boxes on#1-3 Motors.Opendoors on Boiler#1.Clean and grease ng floor Demco valves.Cont.repair on IDS Brake System.Skid rig floor into stack out position.Weld patch on gun line in Pits,Drain water
from Boiler#1.Drain hot well,finish draining rig water tank,rattle tubes,remove all hatches and clean out,prep for stack out,finish beaming around cellar,hang over head flags on pit auger and pallet lift,cont
working on break system,finish cleaning boiler#1,clean and prep pipe skate for stack out,LO/TO rock washer equipment,LOTTO pits moving system,LO/TO pipe skate and hydraulic systems,fill air gaps around
rig,stage equipment in yard for stack out,cover intakes in pump room motor room,service pipe shed door system and coat lines: _.
Operation at 07.00
Rig Down/Stack Out Procedures.
Time Log
Start End Cum Dur
Time Time Dur(hr) (hr) Phase Opr. Act. Plan Oper.Descr.
00:00 12:00 12.00 12.00 W.0 7 A l P Cold Stack Report#8
PJSM Spray LPS3 on moving system polish rods Coil shop Gai-tronics cable and free power cable from ice.Stack Mats in
yard.Cap off drillers side suit case to valve house.Gather tools and string out stomper cables.Install gauge on stomper
cylinder.Service sheaves in Pipe Shed doors and cable coal lines.Remove life lines from Pipe Shed.Install stomper beams
with CH2M crane.Remove batteries and shut down brain boxes on#1-3 Motors.Open doors on Boiler#1.Clean and
grease rig floor Demco valves.Cont:repair en IDS Brake System.Skid rig floor into stack out position.Weld patch on gun
line in Pits.Drain water from Boiler#1.
12.00 00.00 12.00 24.00 W.O. A 1 P Drain hot well,finish draining rig water tank,rattle tubes,remove all hatches and clean out,prep for stack out,finish beaming
around cellar,hang over head flags on pit auger and pallet lift,cont working on break system,finishcleaning boiler#1,clean
and prep pipe skate for stack out,LO/TO rock washer equipment,LO/TO pits moving system,LO/TO pipe skate and
hydraulic systems,fill air gaps around rig,stage equipment in yard for stack out,cover intakes in pump room&motor room
service pipe shed door system and coat lines
Daily Contacts
Position Contact Name Company Title .`Email Office Mobile
Sot representative 'Oliver Amend: ENI Drilling Supv. 907-685-0715
Ent representative Mitch Billington ENI Drilling Supv/Clerk. akrigclerksdoyon15@enipetroleum.com 907-685-0722
Ent representative Troy England ENI HSE
Ent representative Greg Parker ENI Expediter 907-980-7545
Tool Push Chad Johnson Doyon Drilling Tool Pusher rig15@doyondrilling.com 907-685-0716
Tool Push Sean Tower Doyon Drilling ToolPusher
Last Casing Seat
Cas.Type OD(in) ID(in) Grade Top(mKB) Bottom(mKB),. TVD Bot.(mKB) Run Date
LINER 3112 6,283.94 6,30113 1,18913 5/3/2014
Well Name: SP05-FN7 O1 •Daily Report
1,11)14‘
Wellbore Name: SP05-FN
Date: 5/16/2016
• Well Code: 26944 Report#: 20
�n�''' Job: WORKOVER Page:1 of 1
Well Header
Permit/Concession N° Operator Subsidiary Initial Lahee Code
SOUTH PASS 46(F.I.) ENI PETROLEUM EM Petroleum Co.Inc. DEVELOPMENT WELL
Rotary Table Elevation(m) Water Depth(m) First Flange(m) RKB-Base Flange(m) RKB-Tubing Spool(m)
16.34 0.00 5.17 11.17 9.67
Rig Information
Rig Name Contractor Rig Type Rig Num
RIG 15 DOYON LAND RIG 0723
Daily Information
Weather Temperature(°C) Wind Days LTI(days) Days RI(days) POB
Overcast Light snow -4.2 NE @ 26 MPH Gusting to 35 MPH 48.0
Daily Summary Operations
24h Forecast
Cont.w/Rig Down.Procedures.
24h Summary
Cold Stack Report#9
Clean and organize Parts House,rig floor,mezzanine and Pipe Shed.Service and coat Tugger cables and Man Rider on rig floor.Gather tools for draining Drawworks Glycol tank.Clean and organize RAA/SAA
areas.Cont.work on Wichita Brake System.Hook up Derrick lights to shore power.Replace Boiler chemical lines.Clean moving system Hydraulic unit..Install expansion boot and liners for testing Whitchita Brake.
Cont.W/brake repair,sort and store iron racks for stack out,replace pipe shed door seals,pack up drills office equipment for stack out,clean and prep electrical cabinets for stack out,cable coat bridal lines and
super tugger,change chain oil on pump#2,fog intakes on#1 cats for stack out,replace rig floor stair well skid gap rubber,remove nitrogen and acetylene bottles from ng for stack out,housekeeping.
Operation at 07.00
Rig Down I Stack Out Procedures.
Time Log
Start End Cum Dur
Time Time Dur(hr) (hr) Phase Opr. Act. Plan Oper.Descr.
00.00 12:00 12.00 12.00 W 0 A '1 P / PJSM Clean and organize Parts House,rig floor,mezzanine and Pipe Shed.Service and coat Tugger cables and Man Rider
on rig floor.Gather tools for draining Drawworks Glycol tank.Clean and organize RAA/SAA areas.Cont.work on Wichita
Brake System.Hook up Derrick lights to shore power.Replace Boiler chemical lines.Clean moving system Hydraulic unit.
Install expansion boot and liners for testing Whitchita Brake11 .
12.00 00:00 12.00 24.00 W.O. A 1 P Cont.W/brake repair,sort and store iron racks for stack out,replace pipe shed door seals,pack up drills office equipment for
stack out,clean and prep electrical cabinets for stack out,cable coat bridal lines and super tugger.change chain oil on pump
#2,fog intakes on#1 cats for stack out,replace rig floor stair well skidgap rubber,remove nitrogen and acetylene
bottles from rig for stack out,housekeeping ii
Daily Contacts
Position Contact Name _ Company Title Email Office Mobile
Drilling Supt .Bruno Ravagli' ENI Drill Superintendent -
Eni representative Oliver Amend ENI Drilling Supv. 907-685-0715
Eni.representative Mitch,Billington ENI Drilling Supv/Clerk. akrigclerksdoyon15@enipetroleum.com 907-685-0722
Eni representative Troy England ENI HSE
Eni representative Greg Parker ENI Expediter 907-980-7545
Tool.Push Chad Johnson Doyon Drilling Toot Pusher rig15@doyondrilling.cam 907-685-0716
Tool.Push Sean Tower Doyon Drilling ToolPusher
Last Casing Seat
Cas.Type OD(in) ID(in) Grade Top(mKB) Bottom(mKB) ND Bot.(mKB) Run Date
LINER - 31/2 6,283.94 6,30113 1,189.13 5/3/2014
040,0011, Well Name: SP05-FN7 O Daily Report
Wellbore Name: SP05-FN •Date: 5/17/2016
• Well Code: 26944 Report#: 21
en° Job: WORKOVER Page:1 of 1
Well Header
Permit/Concession N° Operator Subsidiary Initial Lahee Code
SOUTH PASS 46(F.I.) ENI PETROLEUM ENI Petroleum Co.Ina - DEVELOPMENT WELL
Rotary Table Elevation(m) Water Depth(m) First Flange(m) RKB-Base Flange(m) RKB-Tubing Spool(m)
16.34 0.00 5.17 11.17 9 67
Rig Information
Rig Name Contractor Rig Type Rig Num
RIG 15 DOYON LAND RIG 0723
Daily Information
Weather Temperature(°C) Wind Days LTI(days) Days RI(days) POB
Overcast -1.9 ENE @ 46 MPH Gusting to 50 MPH 47.0
Daily Summary Operations
24h Forecast
Cont.w!Rig Down Procedures.
24h Summary
Cold stack report#10
Box up and remove books and tools from Dog House.Fill air gap in sub wheel wells..Clean and organizerig floor,Pipe Shed and Boiler room.Close and secure air conditioner for TDS-8.Service slips,ng tongs
and dog collar.Clean and organize in Pump Room.Test Witchita Brake System with TDS-8 weight.Operate TDS-8 to mix up corrosion inhibitor.Install Witchita Brake covers.Blow down IDS Glycol lines and blank
off pump.Fill bulk oil tote in pump room.Start to drain Drawworks Glycol tank,Put second layer of cable coat on bridal lines,change hydraulic oil in accumulator,change oil in accumulator triplex pump and gear
case W/addilive and LO/TO for stack out,LO/TO drawworks and drain coolant tank,add oil additive to rotary table,remove drawworks traction motor brushes,service top drive electrical for stack out,set top drive
on stops,cover top dove draw-works driller console,choke panel,remove witchita coolant lines,secure cat exhaust flaps,housekeeping,coat misc equipment W/LPS consolidate oil products on dock,prep
roughneck tools for stack out.
Operation at 07.00
Rig Down/Stack Out Procedures.
Time Log
Start End Cum Dur
Time Time Dur(hr) (hr) Phase Opr. Act. Plan Oper.Descr.
0000 12:00: 12.00 12.00 W . A 1 P PJSM Box up and:remove books and tools from Dog House.Fill air gap in sub wheel wells.:Cleanand organize rig floor,Pipe
Shed and Boiler room.Close and secure air conditioner for TDS-S:Service slips,rig tongs and dog collar.Clean and organize
in Pump Room.Test Witchita Brake System with TDS S.weight.Operate TDS-8 to mix up corrosion inhibitor Install Witchita
Brake covers.Blow down IDS Glycol lines and blank off pump Fill bulk oil tote in pump room.Start to drain Drawworks Glycol
tank.
12.00 00.00 12.00 24.00 W 0 A 1 P Put second layer of cable coat on bridal lines,change hydraulic oil in accumulator,change oil in accumulator triplex pump
and gear case W/additive and LO/TO for stack out,LO/TO draw-works and drain coolant tank,add oil additiveto rotary table, '.
remove drawworks traction motor brushes,service top drive electrical for stack out set top drive on stops,cover top drive
drawworks driller console,choke panel,remove witchita coolant lines,secure cat exhaust flaps,housekeeping,coat misc
equipment W/LPS consolidate oil products on dock,prep roughneck tools for stack out.
Daily Contacts
Position Contact Name Company Title Email Office Mobile
Drilling Supt. Bruno Ravagli, ENI Drill Superintendent
Eni representative Oliver Amend ENI Drilling Supv. 907-685-0715
Eni representative -Mitch Billington ENI Drilling Supv/Clerkakrigclerksdoyon15@enipetroleum.com 907-685-0722
Eni representative Troy England ENI HSE
Eni representative Greg Parker ENI Expediter 907-980-7545
Tool Push Chad Johnson Doyon Drilling Tool Pusher rig15@doyondrilling.cam 907-685-0716
Tool Push Sean Tower Doyon Drilling ToolPusher
Last Casing Seat
Cas.Type OD(in) ID(in) Grade Top(mKB) Bottom(mKB) TVD Bot.(mKB) Run Date
LINER 31/2 : 6,283.94 6,301.13 1,189.13 5/3/2014
Well Name: SP05-FN7 0 •Daily Report
Wellbore Name: SP05-FN
Well Code: 26944 Date: 5/18/2016
Ra
Job: WORKOVERPage: #: 22
1 of 1
Well Header
Permit/Concession N" Operator Subsidiary Initial Lahee Code
SOUTH PASS 46(F.I.) EM PETROLEUM EM Petroleum Co.Inc. DEVELOPMENT WELL
Rotary Table Elevation(m) Water Depth(m) First Flange(m) RKB-Base Flange(m) RKB-Tubing Spool(m)
16.34 0.00 5.17 11.17 9.67
Rig Information
Rig Name Contractor Rig Type Rig Num
RIG 15 DOYON LAND RIG 0723
Daily Information
Weather Temperature(CC) Wind Days LTI(days) Days RI(days) POB
Overcast -1.7 ENE @ 34 MPH Gusting to 42 MPH 47.0:
Daily Summary Operations
24h Forecast
Cont.w/Rig Down Procedures.
24h Summary
Cold Stack Report#11
PJSM Spray LPS3 on valves around rig.Open all water valves for stack out.Inspection on rig hydraulics and moving system.Clean in motor room,RAA and cover generators and control panels with Herculite and
Vici wrap.Prep hand tools for cold stack.Install Desiccant into Boilers.Install Tabulators in Boiler#2.Install Vici in electrical panels.Remove AM 103 from boiler room and place in warm storage.Fill in air gaps in
Pipe Shed,wheel well and cellar.Repair water tank access hatch hinges.House keeping in Pits and Pipe Shed,Remove and store SRL's from around rig,clean PFC cabinet,replace weather stripping on beaver
slide doors,clean out paint lockers,place desiccant in electrical enclosures,finish covering equipment on rig floor,chink rig,set to drain coolant from#2 Cat,contto coat equipment W/LPS,drain coolant from#2
Cat,cover moving system stations,housekeeping,organize equipment in yard for stack out.
Operation at 07.00
Rig Down/Stack Out Procedures.
Time Log
Start End Cum Dar
Time Time Dur(hr) (hr) Phase Opr. Act. Plan Oper.Descr.
00.00 12:00 12.00 12.00 W.O.. A 1 P PJSM Spray LPS3 on valves around rig.Open all water valves for stack out.,Inspection on rig hydraulics and moving system.
Clean in motor.room,RAA and cover generators and:control panels with Herculite and Vici wrap.Prep hand tools for cold
stack.Install Desiccant into Boilers.Install Tabulators in Boiler#2.Install Vici in electrical panels.Remove AM 103 from boiler
room and place in warm storage.Fill in air gaps in Pipe Shed,wheel well and cellar.Repair water tank access hatch hinges.
House keeping in Pits and Pipe Shed
12.00 00:00 12.00' 24.00 W 0 A 1 P Remove and store SRL's from around ng,clean PFC cabinet,replace weather stripping on beaver slide doors,clean out paint
lockers,place desiccant in electrical enclosures,finish covering equipment on rig floor,chink rig,set to drain coolant from#2
Cat,cont.to coat equipment W/LPS,drain coolant from#2 Cat,cover moving system stations,housekeeping,organize
equipment in yard for stack out.
Daily Contacts
Position Contact Name Company Title Email "`Office Mobile
Eni representative Oliver Amend ENI Drilling Sups. 907-685-0715
Eni representative Mitch.Billington ENI. Drilling Supv/Clerkakrigclerksdoyon15@enipetroleum.com 907-685-0722
Eni representative Troy:England ENI HSE
Eni representative Greg Parker ENI Expediter 907-980-7545
Tool Push Chad Johnson Doyon Drilling Tool Pusher ng15@doyondrilling.com 907-685-0716
Tool Push Pete Martinusen Doyon Drilling Tour Pusher rig15@doyondrilling.com 907-685-0716
Last Casing Seat
Cas.Type OD(in) ID(in) Grade Top(mKB) Bottom(mKB) TVD Bot.(mKB) Run Date
LINER 3 1/2 6,283.94 6,301 13 1,189.13'5/3/2014
iptoiii* Well Name: SP05-FN7 OF *Daily Report
Wellbore Name: SP05-FN
Well Code: 26944 Date: 5/19/2016
.; Report#: 23
c�n Job: WORKOVER Page:1 of 1
Well Header
Permit/Concession N° Operator Subsidiary Initial Lahee Code
SOUTH PASS 46(F.I.) ENI PETROLEUM ENI Petroleum Co.Inc DEVELOPMENT WELL
Rotary Table Elevation(m) Water Depth(m) First Flange(m) RKB-Base Flange(m) >- RKB-Tubing Spool(m)
16.34 0.00 5.17 11.17 9.67
Rig Information
Rig Name - Contractor Rig Type Rig Num
RIG 15 DOYON LAND RIG 0723
Daily Information
Weather Temperature(°C) Wind Days LTI(days) Days RI(days) POB
Overcast -2.0 NE g7 MPH 45.0
Daily Summary Operations
24h Forecast
Cont.w/Rig Down Procedures.
24h Summary
Cold Stack Report#12
Prep and paint in mezzanine,housekeeping in pipe shed,cellar,rig shop,chinking around rig,wrap generator W/VCI wrap,cover control panel on generator#2,clean water tank,tie up drill line in derrick,install
weather stripping for outside doors in cellar,block openings for 3512 room,clean and paint motor room floor,cover breaker boxes in boiler room, put VCI in cabinetsaround rig,block off doors to cellar.Rig down
electronics in drillers office,replace hinge on exhaust flap on drillers side,prep and paint under top drive VFD,close out rig RAA/SAA,prep and paint in cellar area,stick picking around location,shut do air heaters
and secure fuel valves,fill air gaps around rig.
Operation at 07.00
Rig Down/Stack Out Procedures.
Time Log
Start End Cum Dur
Time Time Dur(hr) (hr) Phase _ Opr. Act. Plan Oper.Descr.
00:00 12:00 12.00 12.00 W.O. A 1 P Prep and paint in mezzanine,housekeeping inpipe shed,cellar,rig shop,chinking around rig,wrap generator W/VCI wrap,
cover control panel on generator#2,clean water tank,tie up drill line in derrick,install weather stepping for outside doors in
cellar,block openings for 3512 room,clean and paint motor room floor,cover breaker boxes in boiler room, put VCI in
cabinets around rig,block off doors to cellar.
12:00 00:00 12.00 24.00 W.O. A 1 P Rig down electronics in drillers office,replace hinge on exhaust flap on drillers ode,prep and paintunder top drive VFD,
close out rig RAA/SAA,prep and paint in cellar area,stick puking around location,shut do air heaters and secure fuel valves,
fill air gaps around rig.
Daily Contacts
Position Contact Name Company Title Email Office Mobile
Eni representative Bruce Simonson ENI Drilling Supv. 907-685-0715
Eni representative Mitch Billington ENI Drilling Supv/Clerk. akrigclerksdoyon15@enipetroleum.com 907-685-0722
Eni representative Troy England ENI HSE
Eni representative Greg Parker. ENI ':Expediter 907-980-7545
Tool Push Chad Johnson Doyon Drilling Tool Pusher rig15@doyondrilling.com 907-685-0716
Tool Push Pete Martinusen Doyon Drilling Tour Pusher rig15@doyondrilling.com 907-685-0716
Last Casing Seat
Cas.Type OD(in) ID(in) Grade Top(mKB) c Bottom(mKB) TVD Bot,(mKB) Run Date
LINER 31/2 6,283.94 6,30113 1,18913 5/3/2014
fra.,(tlos, Well Name: SP05-FN7 O *Daily Report
Wellbore Name: SP05-FN
Well Code: 26944 Date: 5/20/2016
= Report#: 24
2 n f Job: WORKOVER Page:1 of 1
Well Header
Permit/Concession N° Operator Subsidiary Initial Lahee Code
SOUTH PASS 46(F.I.) ENI PETROLEUM ENI Petroleum Co.Inc: DEVELOPMENT WELL
Rotary Table Elevation(m) Water Depth(m) First Flange(m) RKB-Base Flange(m) - RKB-Tubing Spool(m)
16.34 0.00 5.17 11.17 9.67
Rig Information
Rig Name Contractor Rig Type .Rig Num
RIG 15 DOYON LAND RIG 0723
Daily Information
Weather Temperature(°C) Wind Days LTI(days) Days RI(days) POE
Overcast -2.6 NNE @ 15 MPH 32.0
Daily Summary Operations
24h Forecast
Rig crew to leave location this morning,
This will be last Rig Workover Report,Cold Stack Complete
24h Summary
Cold Stack Report#13 Final Report
Install caps on 3.0&5.0 heater exhaust,repair caps for boiler exhaust,housekeeping,paint in cellar,prep shop for cold stack,cont pulling batteries out of equipment,cont wrapping equipment with VCI wrap and
install VCI caps in electrical equipment,shut off all electrical heaters and non inuse equipment,check all equipment suction valves are closed,Cont with stack out procedures,remove and store shop power lines
and stands,prep and shut down rig shop,remove all electronics,test rig E-stop operations with 3512,shut down all power and remove remaining batteries,drain coolant from 3512 and store,shut fuel valves and
seal for stack out,park rig loader in shop and secure,lock and secure all doors on rig and shop,sweep and clean yard of debris.
Operation at 07.00
Time Log
Start End Cum Dur
Time Time Dur(hr) (hr) Phase Opr. Act. Plan Oper.Descr.
00:00 12100: 12:00 12.00 W.O A 1 P Install caps on 3.0&5.0 heater exhaust,repair caps for boiler exhaust,housekeeping,paint in cellar,prep shop for cold
stack,cont pulling batteries out of equipment,cont wrapping equipment with VCI wrap and install VCI caps in electrical
equipment,shut off all electrical heaters and non in use equipment,check all equipment suction valves are closed.
12:00 00.00 12.00 24.00 W.0 A 1 P Cont with stack out procedures,remove and store shop power lines and stands,prep and shut downrig shop,remove all
electronics,test rig E-stop operations with 3512,shut down all power and remove remaining battenes,drain coolant from
3512 and store,shut fuel valves and seal for stack out,park rig loader in shop and secure,lock and secure all doors on ng
and shop sweep and clean yard of debris.
Daily Contacts
Position Contact Name Company Title Email`. Office Mobile
Eni:representative Bruce Simonson ENI Drilling Supv. 907-685-0715
Eni representative Mitch Billington ENI Drilling Supv/Clerk. akrigclerksdoyonl5@enipetroleum.com 907-685-0722
Eni representative Troy England ENI HSE
Eni representative Greg Parker ENI Expediter 907-980-7545
Tool Push Chad Johnson Doyon Drilling Tool Pusher rig15@doyondrilling.corn 907-685-0716
Tool Push Pete Martinusen Doyon.Drilling f Tour Pusher rig15@doyondrillivg.com 907-685-0716
Last Casing Seat
Cas.Type OD(in) ID(in) Grade Top(mKB) Bottom(mKB) TVD Bot.(mKB) Run Date
LINER 31/2 6,283.94 6,301.13 1,189.13 5/3/2014
• •
k
2
r
OOO N m NA m m NV0 LL ^ V '_ m m 0 N N ' co n O) m0co.- r e-./
co 0
CD
LL
0
y) at M U) COO CO N COm Ovl. N Q V N .- N U N M COmc.N < CO N CO0Y N � CO0
cNil 64
0 CCS
0.
in E <V
CZ
g LI
_N 6'
13
0 a 0 N m N A N 0 CO N N 0
0 CO 0 V N N m CO N V CD 0) CO 0 m CO CO 0 0 m CO N CO n CD N m .
C N CO..- N V 0 CO V N V N N N V .- 0 N 0 N CO0ua•) N 10 CCI COSI CO+) Y N N O VN'
'g
O
a 3
1' m m m co m co N m m m m A m n A CO CO 0) A n n 0) CO n CO 0) n d < M
W N .- N e- m 0
zW CD
` 8 X
1 C
0 ii g
m ter8
m N m m - CV N 0) m c+ O mOmnN 10 IM O? MM � NV0 OO ' O O is At W 1n M V UR 1A .- CO N N N 10 m m V A tlN N Q N
D.
Z S Z m
O
CO m g
0
a o
Tri
A A m N co O m m co N N m N N co m O 0 E
X N C OE n A N N n A N COW OA r N N A m CO A CO m A m P. A A A m A N A m E
0 E
U Z a
11 Z O 0 m o
ap a in
d a
Y ~ KW L g 15 V N N N N .- N N N N N N O CO 0 n O N N A e- CO .- .- N N N N N 0
11 P
W N 0
Q W r 16 "
W
LL .-I N ro` C7 iu m
Z () N N O CO CO N CO V V O m O CO N O CO CO V m O N A O CO CO CO Q
0 U W Q n m m m m m m m m n m m V N CO N CO V' V 0 0) N N N U) co as V O) V _
a)
N N N N N N N N N N N N N N N N N N
Q N¢ B' N co p
I- 4 J N )
N
7 co
(p
Z Z 1yn 8 8 00) m com T m O co ^ Vm O CO g -s 0 0
CD Imo 0) N N CON g '0V N N p A P. �
Q O a V N fV f0 lV l9 N N fV N N N N N m
J 2 `o
0 c
QQ
2
C 2
_ 0 n CO O 0 P. CO m N CO N 0 A N O v O O m
a m N rn m o o m m
CO '7 N 0 N N N N CO co N CO N CO0N N N N N CD N N N N N CD CO C
Q ID
co
m N w
m m
co O N N 1� N r,_
coN [mV CO ^ OCO CO V) r "`f V N N 01 NC m N N Ul
U = m
E
°o i5 e _w
0.0 m
o g c 2 C
W N N N N N N Cl) N N N Cl) CO N N N N N 0 N CO N N N N N N N N N N y E
•p0
y Y 2
1i Z O
a m
m a c
C)
m m m m m CO co m m m m m e CD CO m m m CD m m m m m m m m m CD d
c 43 9 6 d Id d r d m fd 6 o a!) 6 ' d .d rt d ao N m r 0 m
0
O 8
0 0 0 0 0 o g o 0 0 0 0 0 0 ! g8
0 0 0 0 0 0 0 0 o § m
Y oo000roo4000s o ooCD 00Qo9 gg.s 2
ZCco o CV CV Vb O) N' a4 05 6 N r+ QQN (y0 o s' N rt OS A A N A 6 a I[) (� ^ N 6 co -8 N .�,
ri M N N N N N t0 N el l0 l0 0 t0
Q N N N N N N N N N N N N N N pSN� N CV N N N N N N N N N N N N 0 N
N N N N N qN N N N N co N N N N N N N N N N N N N N N N N N N 0
06 60 06 60 a d o �Q} o CD 0 m i0 m cq m Op m m d0 m g co m S CD m m o
d N N N N N N N 0 0 0 1p 1)7 U) 1[) N .0 h 10 10 .0 1a U)) CC) 10 t� 10 0 t0j 0 CC) C a
1D a
0
E r m
`m E m m 1.
5 id
r E
WOmQn 0 m n . Z
11.3
zZOO a OO0O Z n N n O O O c 0] p LLLLZzLLazz 3 . na aa a a a co a a4 IT u? u? z u? Ii z 3 5 3 d iE a — y 0oN . b h m m O V O O o N 8 m h aP m gA0e z` 3 ao ad ao a0 a a a a a a n. a a E a a a a a a a a a a a a a O a Of az wO O O O O O O O O O 0 0 uCO CO CO N CO m 0 (1) 0 CO CO CO y y m m coQt
/��^ Z�Z-1-79l�
� ' °
Reqq, James B (DOA)
From: Regg, James B (DOA) ,\
Sent: Wednesday, K4oy0� 2OI63:55 PM 6-141"`)
To: Simonson Bruce
Cc: DOA AOGCC Prud hoe Bay
Subject: RE: SPU5 FN7extensinn
Thanks for the reply. | somehow missed the report for the BOPE test our Inspector witnessed 4/20/16. Test results have
been good during the recent workovers.
If the rig has not commenced running the ESP by 5/5/16 (due date for BOPE test)you are required to test
BOPE. Otherwise, BOPE test is waived.
Jim Regg
Supervisor, Inspections SEP2 6 2016
AOGC[
333 W7th Ave,Suite z0U
Anchorage,AK 99501
907-793-1236
CONFIDENTIALITY NOTICE:This emai| message, including any attachments,contains information from the Alaska Oil and Gas Conservation
Commission(AOGCC),State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged information.
The unauthorized review,use or disclosure of such information may violate state or federal law.If you are an unintended recipient of this e-mail,
please delete it without first saving or forwarding it,and,so that the AOGCC is aware of the mistake in sending it to you,contact Jim Regg at 907-
793-1236 or jim.regg@alaska.gov.
.
From: Simonson 8ruce [maiho:Bruue.Simonson@enipetno|eum.com]
Sent: Wednesday, May 04, 2016 3:13 PM
To: Regg, James B (DOA)
Subject: RE: SPO5-FN7 extension
Witness was waived for initial on SPO5'FN7 but inspector witnessed initial on SP04'3[5 the week before. We thought
that we would probably do a cleanout run prior to picking up new completion &would have given 24 hour notice while
picking up drill pipe. Since we are not doing the cleanout run & are now ready to pick up completion we could have the
completion mostly in the hole before the seven day deadline which would be before midnight on 5'5'I6. We will be
putting the rig back in cold stack after the RWO on 3P05'FN7. It is not a problem to test before running back in the hole I
was under the impression that it was ok to ask for extensions on weekly tests if it would be that close.
From: Regg, James B (DOA) [naiho:jim.regg@alaska.gov]
Sent: Wednesday, May 04, 2016 2:40 PM
To: Simonson Bruce
Cc: DOA AOGCC Prudhoe Bay
Subject: RE: SPO5-FN7 extension
You asking for an extension or a waiver? Reason why you can't test before running the new ESP?
Witness of BOPE test is a high priority since we had to waive witness on the initial test last week (and rig has just been
restarted after long shut down).
Is this your only well work with Doyon 15?
Jim Regg
1
Supervisor, Inspections
AOGCC
333 W.7th Ave,Suite 100
Anchorage,AK 99501
907-7934236
CONFIDENTIALITY NOTICE:This e-mail message,including any attachments,contains information from the Alaska Oil and Gas Conservation
Commission(AOGCC),State of Alaska and is for the sole use of the intended recipient(s).It may contain confidential and/or privileged information.
The unauthorized review,use or disclosure of such information may violate state or federal law.If you are an unintended recipient of this e-mail,
please delete it,without first saving or forwarding it,and,so that the AOGCC is aware of the mistake in sending it to you,contact Jim Regg at 907-
793-1236 or jim.reggPalaska.gov.
From: Simonson Bruce [mailto:Bruce.Simonson a@enipetroleum.com]
Sent: Wednesday, May 04, 2016 11:50 AM
To: DOA AOGCC Prudhoe Bay
Subject: SP05-FN7 extension
Gents
I would like to request an extension for the BOPE test due on 5-5-16 for ENI Spy Island SP05-FN7, Doyon 15.We are
currently laying down the old ESP completion and planning to turn around & pick the new completion assembly& run in
the hole. My expectation is that we will land the hanger sometime on or before 5-7-16
Bruce Simonson
ENI Drilling Supervisor
907-685-0715 (SID)
907-685-0710 (OPP)
This message may contain information that is confidential, and is being sent exclusively to the Recipient.
If you are not the designated Recipient, you are prohibited from utilizing, copying or divulging the information contained in
this message,or taking any action whatsoever on the basis of the information herein.
If you have received this message by mistake, we ask you to kindly inform the Sender and to delete the message.
It is understood that, with regard to messages sent by its network, the Company is not responsible for any statements
made or opinions expressed, that are not strictly related to the Company's operations.
This message may contain information that is confidential, and is being sent exclusively to the Recipient.
If you are not the designated Recipient, you are prohibited from utilizing, copying or divulging the information contained in
this message,or taking any action whatsoever on the basis of the information herein.
If you have received this message by mistake, we ask you to kindly inform the Sender and to delete the message.
It is understood that, with regard to messages sent by its network, the Company is not responsible for any statements
made or opinions expressed, that are not strictly related to the Company's operations.
2
• ZIZ17`/0
Regg, James B (DOA)
From: Simonson Bruce <Bruce.Simonson@enipetroleum.com>
Sent: Friday, April 29, 2016 5:26 PM ri 51zicg
To: DOA AOGCC Prudhoe Bay
Cc: Kuck Marc; Ravagli Bruno
Subject: well control
As per guidance bulletin No.10-003 SCANNESEP 2 6 2016
4-29-2016, 14:30 hours
SP05-FN/Nikaitchuq Spy Island/PTD 212-179 Sundry 316-191
Doyon 15
907-685-0715
Operations Summary
Prior to pulling the BPV we had pumped 440 bbl of 9.6ppg brine down the tubing through an open shear valve at 2262'
MD & down the IA simultaneously. Shut the pumps down and monitored psi. The tubing had 280 psi &the IA had 350
psi. After 40 minutes the tubing showed 10 psi &the IA had 41 psi. We lined up to a tiger tank and bled off the IA to 0 psi
no fluid returned. We then used a dry rod and pulled the BPV with the tubing on a vac. Next we picked up the landing
joint screwed into the hanger& backed out the lockdowns.The IA had pressured up to 15 psi we again bled off to the
tiger tank with no fluid returned. Leaving the IA open to the tiger tank we unseated the hanger .( No packer in hole
the ESP completion hangs in the 9 5/8" casing^'800' from liner top). We picked up with the string and fluid which
appeared to be crude oil was observed to be slowly moving up the well bore into the stack. We attempted to re-seat the
hanger but it hung up &would not re-seat. The crude was s owl movin: u• throu:h the stack • • • -vent it f .m
getting back to the pits we closed the upper pipe ram. No fluid flowed out the top of the landing joint or down the open
IA to the tiger tank.
BOPE used—upper pipe ram
Reason for BOPE use—unable to re-seat hanger&to prevent crude oil from getting into the pits
Actions—BOPE was tested on 4-28-2016. We will get the well back into balance, re-seat the hanger, install the BPV&
test dart, then re-test the upper ram with the 4.5" test joint. Continue with RWO as per well plan.
ENI Drilling Supervisor
907-685-0715 (SID)
907-685-0710 (OPP)
This message may contain information that is confidential, and is being sent exclusively to the Recipient.
If you are not the designated Recipient, you are prohibited from utilizing, copying or divulging the information contained in
this message,or taking any action whatsoever on the basis of the information herein.
If you have received this message by mistake, we ask you to kindly inform the Sender and to delete the message.
It is understood that, with regard to messages sent by its network, the Company is not responsible for any statements
made or opinions expressed, that are not strictly related to the Company's operations.
1
OF Tek • •
\� ,�,$), THE STATE Alaska Oil and Gas
7.
of LASI�:A Conservation Commission
-
A
.01V '� 333 West Seventh Avenue
C GOVERNOR BILL WALKER Anchorage, Alaska 99501-3572
�T
" Main: 907.279.1433
OF ALAS�� Fax: 907.276.7542
www.aogcc.alaska.gov
Marc Kuck
Well Operations Project Manager
ENI US Operating Co. Inc. $CAN 2, 0 '!'!i!f,
3800 Centerpoint Drive, Suite 300
Anchorage, AK 99503
Re: Nikaitchuq Field, Schrader Bluff Oil Pool, SP05-FN7
Permit to Drill Number: 212-179
Sundry Number: 316-191
Dear Mr. Kuck:
Enclosed is the approved application for sundry approval relating to the above referenced well.
Please note the conditions of approval set out in the enclosed form.
As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further
time as the AOGCC grants for good cause shown, a person affected by it may file with the
AOGCC an application for reconsideration. A request for reconsideration is considered timely if
it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working
day if the 23rd day falls on a holiday or weekend.
Sincerely,
Cathy '. Foerster
Chair
DATED this Ay of March, 2016.
RBDMS Mg. 21 Zu16
RECEIVED
• •STATE OF ALASKA MAR 1 5 2016
ALASKA OIL AND GAS CONSERVATION COMMISSION 9T1 3//6/4
APPLICATION FOR SUNDRY APPROVALS AOGCC
20 AAC 25.280
1.Type of Request: Abandon ❑ Plug Perforations Li Fracture Stimulate
❑ Repair Well ❑ • Operations shutdown❑
Suspend L_i Perforate ❑ Other Stimulate ❑ Pull Tubing ❑ . Change Approved Program _
Plug for Redrill [ Perforate New Pool [_] Re-enter Susp Well ❑ Alter Casing ❑ Other _ESP Chance-out !-'
2.Operator Name: 4.Current Well Class: 5. Permit to DnII Number:
Eni US Operating Co. Inc. ' Exploratory ❑ Development 0 - 212-179
3.Address:
Stratigraphic [I] Service
❑ 6.API Number:
3800 Centerpoint Drive,Ste.300,Anchorage,AK 99503 50-629-23481-00-00
7. If perforating: 8.Well Name and Number:
What Regulation or Conservation Order governs well spacing in this pool? /lip- SP05-FN7 •
Will planned perforations require a spacing exception? Yes ❑ No [/I'
9. Property Designation(Lease Number): 10.Field/Pool(s):
}JL. 0391283, 0388583, 0388581, 0388571 ' Nikaitchuq Schrader Bluff Oil Pool •
11. PRESENT WELL CONDITION SUMMARY
Total Depth MD(ft): Total Depth TVD(ft): Effective Depth MD: Effective Depth TVD: MPSP(psi): Plugs(MD): Junk(MD):
21230 3733 . 20617 • _ 3918 450 20617 N/A
Casing Length Size MD TVD Burst Collapse
Structural
Conductor 160 20" 160 - 160
Surface 3909 13.375" 3909 2452 5210 2480
Intermediate 11889 9.625" 11889 3997 6890 4790
Production
Liner 8911 5.5" 20674 3910 slotted slotted
Perforation Depth MD(ft): Perforation Depth TVD(ft): Tubing Size: Tubing Grade: Tubing MD(ft):
11889-20617 . 3997-3918 4.5" L80 10588
Packers and SSSV Type: Packers and SSSV MD(ft)and TVD(ft):
N/A N/A
12.Attachments: Proposal Summary [ Wellbore schematic n 13.Well Class after proposed work:
Detailed Operations Program p1 BOP Sketch [ J Exploratory [ ] Stratigraphic ❑ Development ❑ - Service ❑
14. Estimated Date for 4/23/2016 15.Well Status after proposed work:
Commencing Operations: OIL Li , WINJ LI WDSPL ❑ Suspended ❑
16.Verbal Approval: Date: GAS
[_J WAG [] GSTOR ❑ SPLUG ❑
Commission Representative: GINJ Li Op Shutdown ❑ Abandoned ❑
17. I hereby certify that the foregoing is true and the procedure approved
herein will not be deviated from without prior written approval. Contact Andrea Lazzari
Email Andrea.lazzarl@enlpetroleurn.corn
Printed Name Marc Kuck Title Well Operations Project Manager
Signature Phone 907-865-3322 Date 3/15/2016
COMMISSION USE ONLY
Conditions of approval: Notify Commission so that a representative may witness Sundry Number.
31/, • 191
Plug Integrity LJ
g y ❑ BOP Test Mechanical Integrity Test ❑ Location Clearance
Other: i 3 SCS(.) (15,: ,3�� 4:;'r -I, , F
Post Initial Injection MIT Req'd? Yes ❑ No ❑ c
Spacing Exception Required? Yes ❑ No d Subsequent Form Required: / t; '/G, •f RBDMS vv M R L 1 206
APPROVED BY
Approved by: ` COMMISSIO T COMMISSION Date: 3./` �i
/ 4,e_t_d__
UatisU Subs in Form and
Form 10-403 Re ised 11/2015 ApproYed application is valid fo �I�t t e royal. Attachments in Duplicate
? 31)(01 6 /‘ a71 3. i‘ •k
• •
voit•
voit Petlrolletilim
3800 Centerpoint Drive Suite 300
Anchorage,Alaska 99503
Marc Kuck
Phone (907) 865-3322
Email: marc.kuck@enipetroleum.com
March 15th , 2016
Alaska Oil and Gas Conservation Commission
333 West 7th Avenue, Suite 100
Anchorage, Alaska 99501
RE: Application for Sundry Approval for SP05-FN7 Rig Workover
Dear Commissioners,
ENI US Operating Co. Inc. hereby applies for a Workover Sundry for well SP05-FN7.
SP05-FN7 was recompleted on Spy Island on December 28th , 2014 with a through-tubing
conveyed electric submersible pump (TTC-ESP) set at a depth of 10,569' MD. This ESP
producer was completed without a packer.
The well was started up for production in January 2015.
On December 6th 2015 an ESP failure was occurred.
The estimated date for beginning this work is April 23`d, 2016.
/
Please find attached for the review of the Commission forms 10-403 and supporting
documentation.
If you have any questions or require further information, please contact Andrea Lazzari at 907-
865-3323.
Sincerely,
Marc Kuck
Well Operations Project Manager
• •
SP05-FN7 Workover— Summary Page
PTD#:212-179
Current Status
Well SP05-FN7 is currently down due a ESP failure.
Scope of Work
Scope of this workover is change ESP pump.
General Well info
Reservoir Pressure/TVD: This well is expected to have a static max bottom
hole pressure of approximately 1600 psi (3,978'
TVD) during the time of workover, which places
the fluid level well below surface.
Wellhead type/pressure rating: Vetco Gray, MB-247/5000 psi
BOP configuration: Annular/pipe/blind rams/Mudcross/pipe
TIFL/MIT-IA/MIT-OA: Due to the completion design these tests were not t,
performed. Intermediate csg 9 5/8" was tested prior
to drill out on December 2012.
Well type: Producer
Estimated start date: April 23rd 2016
Drilling rig: Doyon 15
Completion Engineer: Andrea Lazzari:
andrea.lazzari@enipetroleum.com
Work: 907-865-3323
• •
Procedure:
1. MIRU Doyon 15.
2. Shear upper GLM valve and pump in bullheading 8.6 ppg KC1 brine through tree.
Pump in bullheading 8.6 ppg KCl brine in IA. Ensure well is killed.
3. Set BPV. ND tree and NU BOP and test to 3500 psi.
4. Pull tubing to upper GLM.
5. Shear lower GLM valve and pump in bullheading 8.6 ppg KCl brine.
6. Pull tubing to lower GLM. Rig up wireline and pull tubing stop check valve.
7. Circulate out remaining production fluid.
8. Continue POOH and lay down ESP assembly.
9. MU new ESP assembly and RIH to setting depth.
10. Land hanger, and test it.
11. Install BPV and nipple down BOP.
12.NU tubing adapter and tree.
13. Pull BPV, install test plug and test tree.
14. Circulate Freeze protect through tree down IA.
15. Shut in well.
16. RDMO.
Below the current schematic of the well:
4-LA 126 ppf Production Tubing eni peer,•Oeom
2,263'MD,1,930'TVD 49°Inc-GLM KBMG, 4-W x 1", SPUS FN7
with 2000 psi STS-1 SOV installed
IMF Oil Producer with
4-'A x-cplg cable clamps,for ESP
Power Cable.(1)3/8"Chem Inj Line ESP Lift
with 2500 psi check valve at bottom
IA
10.343'MD,3,723TVD.78°Inc-GLM.KBMG 4-Y'x 1", As Completed
with 3.100 psi STS-1 SOV installed 12/28/2014
10,40444'2M53 D 3,744'TVD-Discharge Gauge Sub
10.545'MD,3,764'TVD,79°Inc-Bottom of Motor Centralizer
Centrilift,TTC-ESP,134-stage 38OP18SXD pump*25-stage
illhikj
Surf.Casing 1GSB3 seals.210 HP 562 MSP1 motor
13-3/8",68# 3,909' 41*
/ 10,5699'MD 234 Shroud Assembly,cable and chemical injection
MD,2,452'TVDline feed-thrus,with 3 5"Perforated gas dispersion tube
78°Inc. . 5-1/4"Silver Bullet Ecc
(%)./.."
11,764'MD,3.975 TVD-Baker SLXP Liner Hanger/Packer Nose Guide Shoe
20.675'MD,3,910'
HAL 5-0 Oil Swell TVD 97°INC.
Packer
i 9 k 3k # 0
�—
Imm motel
51/2"Swell Plan 20558
IS1/2"Swell Pie#2 198% e�,.
151/2"Swell Pkr#3 17982 #IIIIIIIIIIg r T 1l'_
151/2"Swell Pkr#4 16245 Interco.Casing
51/2 Swell Pie#5 14994 9-5/8",40# TopHanger/Packer
51/2"Swell Pkr#6 13853 5-1 Slotted Liner, 9
11,889'MD,3,99T TVD S-%"15.5 ppf 20,617 MD,
84°Inc. 3,918'TVD.
97°IncCement Squeeze
Nikaitchuq Field—Spy Island .
III •
VetcoGray MB-247
SURFACE COMPLETION SYSTEM
--MAN /CL
15
37.19------
•r"--------:..* 0
1.11 ..1 /.,O r1•
__ ___a&
.o. i
11:.1:.!0111.*:11! l'Ar' iaNiCrf=ti:
T.O.S. EL 26' 5-3/4"
A--111OPP7VA
��11 1.062 OFFSET CA TOP
8.0.S. FL 25' 7-1/4"
(J TOP OF WELLHEAD 5.00' EL 25' 2-1/4"
(J I
a U
40. iki
Pi EllELEC M--CAL
.7 tl `3 FEEOTHRU 21.8t
j /.7 1l
13-5/8" 5000 PSI
VG S137 CLAIAP 11
Pluil
'm •• 4-1/18" eria i.,, I •5000 PSI ._
— ,� — .. 7�i111 LJ --- 7�iIIMIj!I!Iii4
343/ OFFSET 106.0
e NINNY"E 6.50"- 1!. Pt ,
•I•
—
2-1/16" i 5000 PSI,/16" M .-1} 1ss� s5000 PSI '�•_�. t 66.71
OUT O g_ -....Alit
13.5000 PSI
POSITION ___ .•i 1' VG 134 MOO.
52.96" lit ii II ' I it
26.5; ri
S.
1 t :t i' _ 34.00•
Wi 2_1/16: iyI,-_-_„11 !-
5000 P51 ,' I I _ . p ,
OUT OF —24.2 �- 4- 1�• 1 15.25"
POSmON ■iii ri 11
yj-
H I E TOG
-i
TOP OF GRADING Hi A EL 16' 1-1/4"
-too
1 movne»xr Hmict oil
1vr
etc
OD 133# K-55 I . � ��"
13-3/8" OD 681 L-80 I ' '",'K"V` ENI ALASKA
ARADO
9-5/8" OD 53.5# L-80 I 1- WARM a HORIZONTAL MULTI-BOWL SYSTEM
4-1/2" OD WITH 6-5/8 VII ' I 20 X 13-3/8 X 9-5/8 X
E.aooN X 4-1/2 WITH 6-5/8 MT
MM.a::_----- --- AND ESP FLAT CABLE
23 AIL 0E
-axe....1-4-4- �w.o H'73370-1 "a'
w.w lam aromr.cox X%Ktmu.pal X I 1112711:1
PRP 10161, NC 0 OF 10 23 JANUARY 2009
0\`. 1 GE Ir1ognotion 0:work
i
• •
• ryee
ti g
sz
••a•
6
•.. yyyj[3Q�Q��f=[ O
N
c. J N NZ
z Q N . .0 ao a
LI cc w .0.. ;::
,O•c\ "O? Oo O z=
3 a J x O = O z = - a
j m Y U m m f- Q
N M N (0 1� O Q pJp{ \
W ttl
soy • E-1
1 E ,.
O
1 N
pp N J
z
co
.-b-4
U= gF @�
J/` N =
✓ 1 O
t iirc,=, O
OnQ T +�1 1O N S E
Y N Z w
e J_
0 D-
b dl/ m O
I
5 mJ
r / Ox wcpmo
U
u_ IL- z
g
R
`s s . 5 s5 8 sla
g 8 si
g� U_
k •• _. $ d g
n ap I �.
-- ' I --
�I �
--
A6 111--., Z
0
�iiIUnI:I!s:IIIiIt: II=--
ATm
Ea
a
z
IV
' i
i V� I �
�
111.1 i §2 I '25
81 I i
a. I __ 1-11 m!h1 = 1
!:_____41._,._,_n_,..__R___.._t_.,,,,, i
i
• •
6g
R ES
r.
w,5 .. ,,,
.a. ,,, _,.„ , 0
'a c0 c0 c0 c0 N NN NI•N N•N 1•N Ih.-(O.-�7c07 tO 7O7107m 7 CO^UlON 0'i00 N 0LO0LOO inON : O� LI
N M a 4-n
n u (`n o7 o7 0 0 0 0 , N N nna a o n 6 Fo N-`0 0 0 0 0 0 N N M M a a N N d Q>
F- c06 c0 tO c0 c0 00 c06 lZ r r r r N:N:r 1`r rr r rr r r r h:6 oo'oo W c0 co oo of oo Ed co 0o O_ 00
0003
t u 88 0,, s�
0 .-NMN,- ,01.000 7NMa 6NOD0 .--NMa cO1•000 7NMa cOl.oOO ^NM
OdZ g NMMcry MMMM�as Tir �n�n c01.
MMM a a aeraa u] un n 6666 u)66 O O cp O 0 6 N 1.1• N
02 . rA
a
c
no
m o,
c a
g 2 E
uIOOOMO Oarna0a0rnao 0M0MN •N•N
1
0T RN ^NNMMa NNNc0c0I•I. 0Oa000--NNMMyaV7NO0h-r-mmpM000— NNM
'go aaaaaaaaaaaaaaaaValn MI[JiONNN666.Lri66NNOlDf0c0666 81
.0 D 2-
0- 0
0
E
Q 1
C i a in cOl•m0 _NMa0 t0 I•m0 7NMa In[01.000 NMaN c01.m0 7NM ain up f.N 5 �
y N N N N N N N N
3.v, 6.,&06.606,60c666„;66666_000000000;:
-OY
8 8
_ N N
y a
d
y -,
J,11
+a
I. a
! w w a
i
o J = w
so
to 1, iV.
• l'-' 'i Y w
c. o w
i
3
a
3
g
8
1I Z
O
1101H
J
w
tI
c
H\
En^
D
m
cn
a
O
• •
t
> _
a� 'ilkIFF e2p:\ PiLi; 41' * iNik ig tnJ
it e 9 tie
C� ° m
emolo 8
co aw —
i m
2 a
„AN V 0
a - �
PO NV ik,
1- 0
0 �'�► pp i'
,;,
Ilkomit
t,,,,, . r iii '
it , , t
mill law
N
4,,,,
'so-
11111k,
a o
* iciiiirliore
9
„arab.rLiiiii.1um ,lAtA,, . 0
ri ..
IIIIIIr
Plik
it)>> a
> _.
N
=
r)
11>
17
rai >O , > ca vi mr ._ ? >as m aZ °' o re
°' 0 R v cO — Uy =J ccoU Ic' _ C 4 N it 0 mtmQ N 2 a CI 'O Tull L r
W LLt7 ... It 'n s J0 6 W .
illftimmm
A k M N A
Q a
43 2 ..- I.--'E _, o :„,_4 03 oriv. Cr ED a
��
6 is)
• STATE OF ALASKA
ALA.. .OIL AND GAS CONSERVATION COMh, JON
•
REPORT OF SUNDRY WELL OPERATIONS
1.Operations Abandon Li Repair Well [✓j Plug Perforations [J Perforate [J Other U Change out ESP
Performed: Alter Casing ❑ Pull Tubing Q Stimulate-Frac ❑ Waiver ❑ Time Extension 0
Change Approved Program ❑ Operat.Shutdown❑ Stimulate-Other ❑ Re-enter Suspended Well El
2.Operator Eni US Operating Co.Inc. 4.Well Class Before Work: 5.Permit to Drill Number:
Name: Development Q Exploratory ❑ 212-179
3.Address: 3800 Centerpoint Drive,Ste.300,Anchorage, Stratigraphic 0 Service Li 6.API Number:
AK 99503 50-629-23481-00-00
7.Property Designation(Lease Number): 8.Well Name and Number: RECEIVED
ADL 0391283,0388583,0388581,0388571 SP05-FN7
9.Logs(List logs and submit electronic and printed data per 20AAC25.071): 10.Field/Pool(s): JAN 1 3 2015
Nikaitchuq/Schrader Bluff Oil Pool
11.Present Well Condition Summary: AOcCC
Total Depth measured 21,230 feet Plugs measured 20,617 feet �J
true vertical 3,733 feet Junk measured feet
Effective Depth measured 20,617 feet Packer measured feet
true vertical 3,918 feet true vertical feet
Casing Length Size MD TVD Burst Collapse
Structural
Conductor 160 20" 160 160
Surface 3,909 13.375 3,909 2,452 5,020 2,270
Intermediate 11,889 9.625 11,889 3,997 6,870 4,760
Production 8,911 5.5 20,675 3,910 slotted slotted
Liner
Perforation depth Measured depth feet
KANME , ,� .4- 7 j 'r
True Vertical depth feet
Tubing(size,grade,measured and true vertical depth) 4.5 12.6 ppf L80 10,550'MD 3,769'TVD
Packers and SSSV(type,measured and true vertical depth)
12.Stimulation or cement squeeze summary:
Intervals treated(measured):
Treatment descriptions including volumes used and final pressure:
13. Representative Daily Average Production or Injection Data
Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure
Prior to well operation: 700 64 111 25 251
Subsequent to operation: 208 37 650 0 240
14.Attachments: 15.Well Class after work:
Copies of Logs and Surveys Run Exploratory Development 0 � Service Li Stratigraphic LiLTJ
Daily Report of Well Operations X 16.Well Status after work: Oil Gas 0 WDSPL 0
GSTOR ❑ WINJ I=1 WAG ❑ GINJ ❑ SUSP 0 SPLUG 0
17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O.Exempt:
314-632
Contact Giuseppe Maugeri Email giuseppe.maugeri@enipetroleum.corn
Printed Name Marc Kuck Title Drilling&Completion Engineering Manager
Signature �� — Phone (907)865-3328 Date 1/12/2015
Form 10-404 Revised 10/2012 /.Z6. 15 cSubmit O iginal Only
RBDMS IAN 1 1 cmc
•
U
UN O
_C °) 0 N
U)
— Ci) riZ a)
C C3 in 0> ? C
CD •gt
N \ Z 0
, .4__--- u)
0 Z j Q. N + N
V J N C L U
in M Y5 I d 15 D D
J •a 'a^ O a) U L > Li
EL
O v, �� N :C d O f C
•= L W H
•
to s I I T (O ti
CIEC a Q 0 = 0) - = oma °'
n U N O 3 I O N M
��� O LI
H
O Q U L — L
N. 0 E 8 2 0 a I I RS
X Q. O Co . ? J °
X 0) 7:57 � >, 5, 45 = I I C �
J
i
pp 0I XI c E O cc) ami
N O co I I.:
) E N 2 U - O
CD 0a= Qa > I (7 12)
m 7 U r �- o
H
_ p -
Y 1 d N (,5 Lf)
dNC• 0 1 > N- N -C -c O)
N L1J C -0 00 > o (a/) N M
Ui in
- �O E > ~ ti W co N 2
la C O N L N 0 M M 0 C D
C 0) E- > M 2 M b CD I % 0
O
cm
;0 ?0 U) U co U ti O •� LOU) C f—
= F— r �L M LO C N ,_ •� O U
2 pH f6 U C Q N Ci a)
U � M C
co U a) .N O - c
a _ . rn� Q- __ O O E M - �
Q Q o_ (15 CO N- ,. O �
0 o X Lc) () _ C O O)
co 20 ON o •`- CoCo
COQ tea.
N
N 3 `
``!!
n:1).Z. 0 N:n oo 4 17, n Lo CV gtm0
'
IV111‘. •
w w 1 1 1 . 0 O) N
00 Ti
o O7 >
�. ._
C - a *ta aa U
aN C EY Y Y Y Y Y
U o c0 — •a� a a a a a a a
c0 V 0 3 3 3 3 3 3 TD
= ix)i _ N N N :. r. ., N cr
CO7
n C e\•1 N N N r\1 .�-1 L
co LA IA LA LA VI lA .-
r -
Z
•
It I Eni E&P Division ..} I Well Name:SPO5-FN7 OR
EN/Petroleum Co.Inc. Daily Repo l Well Code:26944
Field Name:NIKAITCHUQ
� APIIUWI:50-629-23481-00-00
2^ Date:12/17/2014 - Report#: 1
I� II page 1 of 1 wellbore name: SP05-FN7
Well Header
Permit/Concession N° Operator ENI Share(%) Well Configuration type
212179 ENI PETROLEUM 100.00 HORIZONTAL
Rotary Table Elevation(ft) Ground Level(ft) Water Depth(ft) RKB-Base Flange(ft) RKB-Tubing Spool(ft)
53.62 40.52 36.65 31.74
Rig Information
Contractor Rig Name Rig Type
DOYON RIG 15 LAND RIG
Job Information
Wellbore Job Phase Spud Date Target Depth(ftKB) Target Depth(TVD..,Depth Dr.(MD)(ft) Drilling Hours(hr) Avg ROP(ft/hr) DFS(days)
SP05-FN7 WORKOVER 731.75
Daily Information
End Depth(ftKB) End Depth(TVD)(f.. Depth Progress(ft) Drilling Hours(hr) Avg ROP(ft/hr) POB Temperature(`F) Weather Wind
0.0 106.0 -12.0 Clear WC-27' N @ 7 MPH
Daily summary operation
24h Summary
RDMO Well SI26 and spot 0g over Well SP-05.Sim Ops;Halliburton slick line retrieved sheared valve,installed new shear valve and tested,pulled catcher and R/D.LRS pump 35 bbls diesel down tubing
and secured Well S1-26.
Operation at 07.00
Rigging up to kill well.
24h Forecast
Complete R/U,Post move checklist and ACS berming approval.R/U and kill well.Set BPV.N/D tree and N/U stack.Test BOPE as per AOGCC specs.R/U to pull tubing string.
Lithology Shows MAASP Pressure(psi) Mud Weight(Ib/gal)
Time Log
Start End Cum
Time Time Dur(hr) Dur(hr) Phase Opr. Act. Plan Oper.Descr.
00.00 02:30 2.50 2.50 W.O. A 2 P PJSA R/D flow.bluy,choke and flare line.Disconnect and move rock washer away from pits.Sim Ops;Halliburton slick line
operations,retrieve shear valve,RIH and set new 2000 psi A/T shear and test to 500 psi f/5 min.RIH and retrieve catcher
and R/D wire line equipment.
02.30 03:30 1.00 3.50 W.O. A 2 P PJSA Cont.w/R/D operations.LRS pump 35 bbls diesel down tubing @ 1 bpm,700 IP,1050 FP,shut in @ 800.Secure
well @ 0330 hrs.
03:30 06:00 2.50 6.00 W.O. A 2 P PJSA Secure Suitcase hoses in cellar,R/D well bay stairs and move mud plant suitcases.Blow down pit module steam.
06:00 12:00 6.00 12.00 W.O. A 2 P PJSA B/D rig floor steam.Lay herculite and rig mans on Well SP-05.Prep.sub and skid rig floor off Well SI-26.Raise
stompers on sub.Separate pit module from sub.Move sub towards Well SP-05.
12:00 13:00 1.00 13.00'W.O. A 2 P PJSA Cont.to prep,for move and finish laying mans.
13:00 15:00 2.00 15.00 W.O. A 2 P PJSA Move ng off Well S1-26 and spot over Well SP-05.
15:00 16:30 1.50 16.50 W.O. A 2 P PJSA Set stompers on sub,move pit module next to sub.
16:30 17:30 1.00 17.50 W.O. B 2 P PJSA Skid rig floor over Well SP-05.
17:30 21:00 3.50 21.00 W.O. A 2 P PJSA Remove rig mans from Well SI26.Set herculite and mans for pump#3 and rock washer.R/U floor,pits,and pump
room interconnects.Get steam going through rig floor and pits.
21 00 00:00 3.00 24.00 W.O. A 2 P PJSA Spot pump#3,Mud lab and Mud loggers shack.R/U choke,bluy,cement and flow lines.Berming around ng and
install and test driller side suitcases.
Daily Contacts
Position Contact Name Company Title E-mail Office Mobile
Eni representative Mike Ross ENI Senior Drilling Supv SIDDnlling@enipetroleum.com 907-685-0715
Eni representative Russ Wimmer ENI Drilling Supv. SIDDrilling@enipetroleum.com 907-685-0715 907-320-0058
Eni representative Ben Perry ENI Senior Drilling Supv 907-685-0715
Eni representative Mitch Billington ENI Rig Clerk AKRigClerksDoyon15@enipetroleum.com 907-685-0722
Eni representative Vance Dale ENI Malls Coordinator
Eni representative Jack Kvasnikoff ENI HSE 907-685-0721 907-398-8770
Eni representative Jeremey Decker ENI Expediter eniexpedilor@gmail.com 907-980-7545 907-980-7545
Tool Push Steve Dambacher Doyon Dulling Tool Pusher hg15@doyondrilling.com 907-685-0716
Tool Push Pete Martinusen Doyon Dulling Tour Pusher rig15@doyondhlling.com 907-685-0716
Last Casing seat
Cas.Type OD(in) ID(in) Grade Top(RKB) Bottom(ftKB) Run Date
LINER 51/2 4.950 L-80 11,771.0 20,675.0 1/17/2013
Last Leakoff Test
Depth(ftKB) TVD(ftKB) Fluid Type Fluid Density(lb/gal) P Surf Applied(psi) Eq.Mud Weight(Ib/gal) Leak Off Pressure(psi)
12,030.0 3.999.27 OBM 9.40 730.0 12.91 2,682.9
•
fill* Eni E&P Division 'Well Name:SPOS-FN7 OR
ENI Petroleum Co.Inc. Daily Report Well Code:26944
Field Name: NIKAITCHUQ
• Date:12/18/2014 - Report#: 2 API/UW:50 629-23481-00-00
2 r' i page 1 of 1 Wellbore name: SP05-FN7
Well Header
Permit/Concession N° Operator ENI Share(%) Well Configuration type
212179 ENI PETROLEUM 100.00 HORIZONTAL
Rotary Table Elevation(ft) Ground Level(ft) Water Depth(ft) RKB-Base Flange(ft) RKB-Tubing Spool(ft)
53.62 40.52 36.65 31.74
Rig Information
Contractor Rig Name Rig Type
DOYON RIG 15 LAND RIG
Job Information
Wellbore Job Phase Spud Date Target Depth(f1KB) Target Depth(TVD...Depth Dr.(MD)(ft) Drilling Hours(hr) Avg ROP(ft/hr) DFS(days)
SPO5-FN7 VVORKOVER 732.75
Daily Information
End Depth(ftKB) End Depth(TVD)(f.. Depth Progress(ft) Drilling Hours(hr) Avg ROP(ft/hr) POB Temperature(°F) Weather Wind
0.0 112.0 -5.0 Overcast WC-24' NE @ 13 MPH
Daily summary operation
24h Summary
Complete rig up procedures.R/U to kill well and pump 35 bbls down tubing and 600 bbls down IA.Shut in well and check pressures.340 on tubing.Bleed IA to 0 psi and tubing to 76 psi.Well on U-tube
IA/tubing.Set up Tiger tank and bleed tubing w/40 bbls return and diesel and crude present.R/U slick line unit and RIH to set junk catcher.
Operation at 07.00
Wireline operations,Retrieving shear plug
24h Forecast
Set junk catcher,pull sheared valve,install solid shear valve,test to 500 psi and retrieve junk catcher.Pressure up on tubing and shear lower GLM @ 3100 psi.Pump FW to clear tubing and R/U on IA
and pump 600 bbls FW to clear IA.Monitor well to make sure dead.Set BPV and test dart.N/D Tree and R/U BOPE.Test as per AOGCC specs.
Lithology Shows MAASP Pressure(psi) Mud Weight(Ib/gal)
9.00
Time Log
Start End Cum
Time Time Dur(hr) Dur(hr) Phase Opr. Act. Plan Oper.Descr.
00,00 03:00 3.00 3.00 W.O. A 2 P PJSA Spot rock washer and R/U,Steam to Pump#3.ACS approved berming.Beaver slide set up,Balance stompers and
ensure clear and safe Egress.
03:00 04:00 1.00 4.00 W.O. L 20 P PJSA R/U pumping flange and hose from secondary kill on IA and tubing.R/U lines to kill well.Load 120 degree FW to pits
and mix Safe Surf 0.
04:00 09:00 5.00 9.00 W.O. L 9 P PJSA PT lines to 3500 psi,Bull head 35 bbls FW w/Safe Surf 0 down tubing @ 126 gpm,200 psi.Shut in well,Blow down
line,R/U on IA and PT line to 3500 psi.Bull head 600 bbls FW w/Safe Surf 0 down IA @ 126 gpm.200 IP,500-700 FP.
09.00 10.30 1.50 10.50 W.O. L 11 P PJSA Well shut in IA&tubing @ 340 psi.Bleed IA to 0 psi,tubing vd 27 bbls flow back.Tubing after 45 min @ 130 psi.Set
up Bleed tank and bleed tubing to 76 psi after 10 min,100 psi after 20 min.IA on vac confirming U-Tube.
10:30 14:00 3.50 14.00 W.O. L 20 P PJSA R/U pumping flange on choke line and hose to tubing.Spot Tiger tank in berm and M/U hoses to bluy line and install
choke valve and torque valve @ Tiger tank.
14:00 17:00 3.00 17.00 W.O. L 20 P PJSA PT lines w/air to 110 psi.Bleed off tubing to Tiger tank via choke @ 85 psi.40 bbls flowed to Tiger tank w/diesel
and crude.Shut in tubing @ 8 psi.
17:00 22:00 5.00 22,00 W.O. R 20 P PJSA Spot Halliburton slick line unit,prep.stuffing box and tools,R/U sheaves,pup jt,lubricator and tools.
22:00 00:00 2.00 24.00 W.O. R 19 P PJSA Pressure test Halliburton lubricator and equipment to 500 psi.RIH w/junk catcher.
Daily Contacts
Position Contact Name Company Title E-mail Office Mobile
Eni representative Mike Ross ENI Senior Drilling Supv SIDDnlling@enipetroleum.com 907-685-0715
Eni representative Russ Wimmer ENI Drilling Supv. SIDDnlling@enipetroleum.com 907-685-0715 907-320-0058
Eni representative Ben Perry ENI Senior Dulling Supv 907-685-0715
Eni representative Mitch Billington ENI Rig Clerk AKRigClerksDoyonl5@enipetroleum.com 907-685-0722
Eni representative Vance Dale ENI Malls Coordinator
Eni representative Jack Kvasnikoff ENI HSE 907-685-0721 907-398-8770
Eni representative Jeremey Decker ENI Expediter eniexpeditor@gmail.com 907-980-7545 907-980-7545
Tool Push Steve Dambacher Doyon Dulling Tool Pusher ng15@doyondnlling.com 907-685-0716
Tool Push Pete Martinusen Doyon Dulling Tour Pusher ng15@doyondrilling.com 907-685-0716
Last Casing seat
Cas.Type OD(in) ID(in) Grade Top(f1KB) Bottom(f1KB) Run Date
LINER 51/2 4.950 L-80 11,771.0 20,675.0 1/17/2013
Last Leakoff Test
Depth(ftKB) TVD(ftKB). Fluid Type Fluid Density(Ib/gal) P Surf Applied(psi) Eq.Mud Weight(Ib/gal) Leak Off Pressure(psi)
12,030.0 3,999.27 OEM 9.40 730.0 12,91 2,682.9
Eni E&P Division I Well Name:SPO5-FN7 OR I
11* ENI Petroleum Co.Inc. Daily Repo)..}l Well Code:26944
Field Name:NIKAITCHUO
•
2^ Date:12/19/2014 - Report#: 3
APIIUWI:50-629-23481-00-00
II II ii page 1 of 1 Wellbore name: SP05-FN7
Well Header
Permit/Concession N° Operator ENI Share)%) Well Configuration type
212179 ENI PETROLEUM 100.00 HORIZONTAL
Rotary Table Elevation(ft) Ground Level(ft) Water Depth(ft) RKB-Base Flange(ft) RKB-Tubing Spool(ft)
53.62 40.52 36.65 31.74
Rig Information
Contractor Rig Name Rig Type
DOYON RIG 15 LAND RIG
Job Information
Wellbore Job Phase Spud Date Target Depth(ftKB) Target Depth(TVD...Depth Dr.(MD)(ft) Drilling Hours(hr) Avg ROP(fUhr) DFS(days)
SP05-FN7 WORKOVER 733.75
Daily Information
End Depth(ftKB) End Depth(TVD)(f.. Depth Progress(ft) Drilling Hours(hr) Avg ROP(ft/hr) POB Temperature(°F) Weather Wind
0.0 111.0 -1.0 Overcast WC-24` ENE @ 22 MPH
Daily summary operation
24h Summary
Attempt of set junk catcher,insufficient down weight.Bull head 35 bbls FW down tubing.Attempt to set junk catcher with out success.RIH and retrieve shear valve and install dummy valve and tested to
1000 psi.LRS sheared bottom shear valve @ 3950 psi and R/D Halliburton.Bull head 600 bbls FW down IA and 150 bbls down tubing.Monitor well;320 tubing,220 IA.Bleed pressure of tubing w/40
bbls return w/crude.Bleed pressure off IA w/14 bbls w/crude.Batch up 9.0 ppg bone and ship to mud pits.Bull head 9.0 ppg brine down tubing&IA.250 bbls @ 2400 hrs.
Operation at 07.00
Bleeding off well
24h Forecast
Complete Bull heading w/775 bbls total and monitor well.
Lithology Shows MAASP Pressure(psi) Mud Weight(Ib/gal)
9.00
Time Log
Start End Cum
Time Time Dur(hr) Dur(hr) Phase Opr. Act. Plan Oper.Descr.
00.00 00:30 0.50 0.50 W.O. R 19 P PJSA Attempt to set WL junk catcher.Insufficient down weight do to viscus fluid in tubing.POOH into lubricator.
00.30 01:00 0.50 1.00 W.O. R 9 P PJSA R/U to pump down tubing and bull head 35 bbls of FW @ 84 gpm,1400 ICP,1150 FCP.Monitor well.Tubing on vac.
01:00 07:30 6.50 7.50 W.O. R 19 P PJSA C/O Junk catcher,slip stop pin sheared.RIH and attempt to set junk catcher.POOH and junk catcher slip stop pin
sheared.M/U shear valve retriever and RIH and retrieved shear valve.RIH and set dummy valve in GLM and test to 1000
psi.POOH.LRS Tested lubricator each run to 1000 psi.LRS sheared bottom shear valve @ 3950 psi.R/D Halliburton
equipment.
07.30 13.30 6.00 13.50 W.O. L 9 P PJSA R/U to bull head and test lines to 3500 psi.Bull head 600 bbls FW down IA @ 168 gpm,500-700 ICP,1130 FCP @
212 gpm.Bull head 150 bbls FW down tubing @ 84 gpm,500-700 ICP,570 FCP,IA @ 460.Pressure @ 5 min:320
tubing,220 IA.Bleed tubing w/40 bbls returned.Line up to U-tube tubing to IA.Bleed back and observed crude to pits.
Shut in well.
13:30 15:00 1.50 15.00 W.O. L 19 P PJSA Bleed IA through choke to tiger tank w/14 bbls of crude returns.Shut in pressures 30 tubing,40 IA.Blow down lines.
15:00 22:00 7.00 22.00 W.O. L 8 P PJSA Building 9.0 ppg brine for well kill @ Mud plant.Transfer brine to rig pits.
22:00 00:00 2.00 24.00 W.O. L 9 P PJSA Tubing and IA @ 11 psi.Bullhead 9.0 ppg brine down tubing @ 1 bpm.300 psi and Down IA @ 3.7 bpm,180 psi.
Pumped a total of 250 bbls of 775 bbls @ 2400 hrs,545 tubing,520 IA.
Daily Contacts
Position Contact Name Company Title E-mail Office Mobile
Eni representative Mike Ross ENI Senior Drilling Supv SIDDnlling@enipetroleum.com 907-685-0715
Eni representative Russ Wimmer ENI Drilling Supv. SIDDrilling@enipetroleum.com 907-685-0715 907-320-0058
Eni representative Ben Perry ENI Senior Drilling Supv 907-685-0715
Eni representative Mitch Billington ENI Rig Clerk AKRigClerksDoyon15@enipetroleum.com 907-685-0722
Eni representative Vance Dale ENI Matls Coordinator
Eni representative Jack Kvasnikoff ENI HSE 907-685-0721 907-398-8770
Eni representative Jeremey Decker ENI Expediter eniexpeditor@gmail.com 907-980-7545 907-980-7545
Tool Push Steve Dambacher Doyon Drilling Tool Pusher rig15@doyondrilling.com 907-685-0716
Tool Push Pete Maninusen Doyon Drilling Tour Pusher ng15@doyondrilling.com 907-685-0716
Last Casing seat
Cas.Type OD(in) ID(in) Grade Top(RKB) Bottom(ftKB) Run Date
LINER 51/2 4.950 L-80 11,771.0 20,675.0 1/17/2013
Last Leakoff Test
Depth(ftKB) TVD(ftKB) Fluid Type Fluid Density(lb/gal) P Surf Applied(psi) Eq.Mud Weight(Ib/gal) Leak Off Pressure(psi)
12,030.0 3,999.27 OBM 9.40 730.0 12.91 2,682.9
• lip I I I I I I ir*, Eni E&P Division I Well Name:SP05-FN7 OR
EN/Petroleum Co.Inc. Daily Report Well Code:26944
Field Name:NIKAITCHUQ
• Date:12/20/2014 - Report#: 4 APIIUWI:50 629-23481-00-00
e i I page 1 of 1 Wellbore name: SPO5-FN7
Well Header
Permit/Concession N° Operator ENI Share(10) Well Configuration type
212179 ENI PETROLEUM 10000 HORIZONTAL
Rotary Table Elevation(ft) Ground Level(ft) Water Depth(ft) RKB-Base Flange(ft) RKB-Tubing Spool(ft)
53.62 40.52 36.65 31.74
Rig Information
Contractor Rig Name Rig Type
DOYON RIG 15 LAND RIG
Job Information
Wellbore Job Phase Spud Date Target Depth(ftKB) Target Depth(TVD...Depth Dr.(MD)(ft) Drilling Hours(hr) Avg ROP(ft/hr) DFS(days)
SP05-FN7 WORKOVER 734.75
Daily Information
End Depth(ftKB) End Depth(TVD)(f.. Depth Progress(ft) Drilling Hours(hr) Avg ROP(ft/hr) POB Temperature(°F) Weather Wind
0.0 111.0 2.0 Overcast WC-15° E @ 12 MPH
Daily summary operation
24h Summary
Complete Bull heading w/9.0 ppg brine and mender well.Bleed off pressure through tubing and well Dead.Set BPVand N/D Tree.Install blanking plug.N/U BOPE and test w/4.5"test jt as per AOGCC
specs.Witness waived by Matt Herrera.Load Baker and GBR tools to rig floor.Pull tubing hanger @ 160k and pull to rig floor.Baker and Vetco decomplete hanger.Complete decompletion R/U and L/D
hanger.
Operation at 07.00
POOH L/D tubing @ 9,500'MD
24h Forecast
POOH L/D 4.5"tubing string.Baker taking pictures of all components.
Lithology Shows MAASP Pressure(psi) Mud Weight(lb/gal)
9.00
Time Log
Start End Cum
Time Time Dur(hr) Dur(hr) Phase Opr. Act. Plan Oper.Descr.
00:00 01:30 1.50 1.50 W.O. L 9 P PJSA Cont.to Bull head 9.0 ppg down IA @ 42 gpm.660 FCP and Tubing @ 155 gpm,750 FCP.Total of 775 bbls
bullheaded.Shut in pressures;540 Tubing,521 IA.
01:30 05:00 3.50 5.00 W.O. L 19 P PJSA Monitor pressures for 90 min:166 Tubing,217 IA.Bleed off tubing in 10 min increments then shut in.57 bbls bleed
back.Confirm well is dead.
05:00 05:30 0.50 5.50 W.O. L 20 P PJSA B/D and R/D from bull heading operations.
0530 07:00 1.50 7.00 W.O. C 19 P PJSA Set BPV,N/D Tree and install blanking plug as per Vetco.
07:00 09.30 2.50 9.50 W.O. C 20 P PJSA N/U Hi pressure riser,BOPE w/all lines and flow riser.
0930 1300 3.50 13.00 W.O. C 20 P PJSA Install test jt and R/U to test BOPE.Flood stack and C94 body on well head leaking.Pull test Jr,drain stack and install n_
plug.Install test jt and refill stack. '`r/(rn
13:00 18:00 5.00 18.00 W.O. C 12 P PJSA Test BOPE w/4.5"test jt as per AOGCC specs.Witnessed waived by Matt Herrera. 0/
18:00 19:30 1.50 19.50 W.O. C 20 P PJSA B/D and R/D testing equipment.Pull test jt and test dart.Pull BPV. /'r/�
19:30 20:30 1.00 20.50 W.O. L 20 P PJSA Load Baker and GBR tools to ng floor.M/U landing jt and BOLDS.
20:30 22:05 1.50 22.00 W.O. L 4 P PJSA Pull hanger free @ 160k and to rig floor.Baker and Vetco decomplete hanger.Baker prep.ESP and Cap line for
pulling.
22.00 23:30 ' 1.50 23.50 W.O. L 20 P PJSA Hang Elephant trunk to ESP sheave and string up Cap sheave.Tie string up lines to spooler and set berming.
23.30 00:00 0.50 24.00 W.O. L 20 P PJSA UD Vetco hanger.
Daily Contacts
Position Contact Name Company Title E-mail Office Mobile
Eni representative Mike Ross ENI Senior Drilling Supv SIDDnlling@enipetroleum.com 907-685-0715
Eni representative Russ Wormer ENI Drilling Supv. SIDDnlling@enipetroleum.com 907-685-0715 907-320-0058
Eni representative Ben Perry ENI Senior Drilling Supv 907-685-0715
Eni representative Mitch Billington ENI Rig Clerk AKRigClerksDoyon15@enipetroleum.com 907-685-0722
Eni representative Vance Dale ENI Matls Coordinator
Eni representative Jack Kvasnikoff ENI HSE 907-685-0721 907-398-8770
Eni representative Jeremey Decker ENI Expediter eniexpeditor@gmail.com 907-980-7545 907-980-7545
Tool Push Steve Dambacher Doyon Dolling Tool Pusher rig15@doyondrilling.com 907-685-0716
Tool Push Pete Martinusen Doyon Drilling Tour Pusher ng15@doyondrilling.com 907-685-0716
Last Casing seat
Cas.Type OD(in) ID(in) Grade Top(ftKB) Bottom(ftKB) Run Date
LINER 51/2 4.950 L-80 11,771.0 20,675.0 1/17/2013
Last Leakoff Test
Depth(ftKB) TVD(ftKB) Fluid Type Fluid Density(Ib/gal) P Surf Applied(psi) Eq.Mud Weight(lb/gal) Leak Off Pressure(psi)
12,030.0 3.999.27 OBM 9.40 730.0 12.91 2,682.9
fil* Eni E&P Division I Well Name:SPOS-FN7 OR
ENI Petroleum Co.Inc. Daily Report Well Code:26944
Field Name:NIKAITCHUQ
� APIIUWI:50-629-23481-00-00
2^ Date:12121/2014 - Report#: 5
'I II page 1 of 1 Wellbore name: SP05-FN7
Well Header
Permit/Concession N° Operator ENI Share)%) Well Configuration type
212179 ENI PETROLEUM 100.00 HORIZONTAL
Rotary Table Elevation(it) Ground Level(ft) Water Depth(ft) RKB-Base Flange(ft) RKB-Tubing Spool(ft)
53.62 40.52 36.65 31.74
Rig Information
Contractor Rig Name Rig Type
DOYON RIG 15 LAND RIG
Job Information
Wellbore Job Phase Spud Date Target Depth(MB) Target Depth(TVD...Depth Dr.(MD)(ft) Drilling Hours(hr) Avg ROP(ft/hr) DFS(days)
SP05-FN7 WORKOVER 735.75
Daily Information
End Depth(ftKB) End Depth(TVD)(f.. Depth Progress(ft) Drilling Hours(hr) Avg ROP(ft/hr) POB Temperature(°F) Weather Wind
0.0 107.0 -9.0 Mostly Cloudy WC- WSW @ 8 MPH
25"
Daily summary operation
24h Summary
POOH L/D 4.5"completion t/150'.R/U slick line and pull tubing stop and pack off assy.Could not pull pump.
Operation at 07.00
L/D ESP Motor assembly
24h Forecast
POOH w/4.5"completion to top of pump and pull pump assy.POOH and LID all completion tools.Load 5"DP in pipe shed and strap for clean out run.
Lithology Shows MAASP Pressure(psi) Mud Weight(lb/gal)
9.00
Time Log
Start End Cum
Time Time Dur(hr) Dur(hr) Phase Opr. Act. Plan Oper.Descr.
00:00 02:00 2.00 2.00 W.O. L 4 P PJSA POOH L/D 4.5"completion f/10,544'-10,342'.Pull ESP and Cap line through sheaves.
02:00 06:00 4.00 6.00 W.O. L 4 P PJSA POOH L/D 4.5"completion f/10,342'-8180',132k puw,100k sow.Remove Gator slice and crimp ESP together.
06:00 06:30 0.50 6.50 W.O. L 4 P PJSA POOH L/D 4.5"completion f/8180'-7890'.
06:30 07:30 1.00 7.50 W.O. L 20 P PJSA CIO ESP spool.
07:30 12:00 4.50 12.00 W.O. L 4 P PJSA POOH L/D 4.5"completion f/7890'-4281',110k puw,100k sow.
12:00 16:00 4.00 16.00 W.O. L 4 P PJSA POOH L/D 4.5"completion f/4281'-1100',105k sow.
16.00 18:00 2.00 18.00 W.O. R 19 P PJSA R/U Halliburton slick line and RIH w/GR tool.Tag in GLM @ 850'WLM.Made severval attempts to get through
GLM.POOH and R/D slick line.
18-.00 19:30 1.50 19.50 W.O. -L 4 P PJSA POOH L/D 4.5"completion f/1100'-231'.L/D GLM.
19.30 22.00 2.50 22.00 W.O. R 19 P PJSA R/U slick line and RIH w/bailer.Tag sand @ 20'in on Jt#3(10,336'f/RKB).Run bailer 4 X bring 2'sand out each
run.R/D slick line and R/U and flush sand f/tubing w/1"water hose.L/D Jts#3 and#2 t/150'.
22:00 22.30 0.50 22.50 W.O. L 20 P PJSA Flush tubing f/top of PDS to top of tubing stop.
'
22:30 00-.00 1.50 24.00 W.O. R 19 P PJSA RIH vd gauge ring and tag top of tubing stop.POOH and P/U GS tool and RIH and latch on tubing stop and POOH
L/D same.RIH and pull packoff assy.and L/D.RIH and latch pump assy and sheared off 3 times.103 bbls Tourly fluid
losses.180 bbls Tourly fluid losses.
Daily Contacts
Position Contact Name Company Title E-mail Office Mobile
Eni representative Mike Ross ENI Senior Drilling Supv SIDDnlling@enipetroleum.com -907-685-0715
Eni representative Russ Wimmer ENI Dolling Supv. SIDDrilling@enipetroleum.com 907-685-0715 907-320-0058
Eni representative Ben Perry ENI Senior Drilling Supv 907-685-0715
Eni representative Mitch Billington ENI Rig Clerk AKRigClerksDoyon15@enipetroleum.com 907-685-0722
Eni representative Vance Dale ENI Matls Coordinator
Eni representative Jack Kvasnikoff ENI HSE 907-685-0721 907-398-8770
Eni representative Jeremey Decker ENI Expediter eniexpeditor@gmail.com 907-980-7545 907-980-7545
Tool Push Steve Dambacher Doyon Drilling Tool Pusher rig15@doyondrilling.com 907-685-0716
Tool Push Pete Martinusen Doyon Drilling Tour Pusher rig15@doyondrilling.com 907-685-0716
Last Casing seat
Cas.Type OD(in) ID(in) Grade Top(ftKB) Bottom(MB) Run Date
-
LINER 5112 4.950 L-80 11,771.0 20,675.0 1/17/2013
Last Leakoff Test
Depth(ftKB) TVD(ftKB) Fluid Type Fluid Density(lb/gal) P Surf Applied(psi) Eq.Mud Weight(lb/gal) Leak Off Pressure(psi)
12.030.0 3,999.27 OBM 9.40 730.0 12.91 2,682.9
• Of* E&P Division I Well Name:SP05-FN7 OR I
ENI Petroleum Co.Inc. Daily Report Well Code:26944
Field Name:NIKAITCHUQ
• API/UWI:50-629-23481-00-00
2^Int Date:12/22/2014 - Report#: 6
page 1 of 1 Wellbore name: SPO5-FN7
Well Header
Permit/Concession N° Operator ENI Share)%) Well Configuration type
212179 ENI PETROLEUM 100.00 HORIZONTAL
Rotary Table Elevation(ft) Ground Level(ft) Water Depth(ft) RKB-Base Flange(ft) RKB-Tubing Spool(ft)
53.62 40.52 36.65 31.74
Rig Information
Contractor Rig Name Rig Type
DOYON RIG 15 LAND RIG
Job Information
Wellbore Job Phase Spud Date Target Depth(ftKB) Target Depth(TVD...Depth Dr.(MD)(ft) Drilling Hours(hr) Avg ROP(ft/hr) DFS(days)
SP05-FN7 WORKOVER 736.75
Daily Information
End Depth(ftKB) End Depth(TVD)(f.. Depth Progress(ft) Drilling Hours(hr) Avg ROP(ft/hr) POB Temperature(°F) Weather Wind
0.0 104.0 4.0 Light Snow WC-11" W @ 10 MPH
Daily summary operation
24h Summary
R/D Halliburton slick line.POOH and L/D 4.5"completion string.Bottom assemblies sanded off.Load and process 5"DP for clean out 9 5/8"casing to TO Liner.M/U and rack back 52 stands of DP.M/U
BHA and single in hole to 2216'.
Operation at 07.00
Single in the hole with 5"DP @ 5615'.
24h Forecast
Single in the hole then RIH w/stands to TO Liner.Rotation may be needed.Follow K&M Schedule.Perform cleanup cycle w/8.8 ppg viscus bone and BROOH and cleanup well.
Lithology Shows MAASP Pressure(psi) Mud Weight(lb/gal)
9.00
Time Log
Start End Cum
Time Time Dur(hr) Dur(hr) Phase Opr. Act. Plan Oper.Descr.
00:00 00:30 0.50 0.50 W.O. R 20 P 'PJSA Could not retrieve ESP pump w/slick line.R/D Halliburton.
00:30 06:00 5.50 6.00 W.O. L 4 P PJSA UD DGU and pup.P/U jt#1 and attempt to pull pump.Pump hanging up.M/U jt#1,break out pup above upper
perforated housing.P/U jt#1 w/pup and L/D upper section of pump.UD jt#1 and pup.M/U 5'pup to upper perforated
housing and L/D and UD lower pump assy in housing.Will be dismantled in town.L/D motor shroud and 3.5"perforated
tubing tail.Pump and shroud packed off w/sand.Clamps retrieve;234 Cannon.6 half,2 splice.
06:00 06:30 0.50 6.50 W.O. L 20 P 'PJSA L/D ESP and Cap line as per Baker.
06:30 06:00 1.50 8.00 W.O. L 20 P 'PJSA Clear and clean rig floor.
08:00 12:00 4.00 12.00 W.O. L 20 U PJSA Loading and process 380 jts of 5"DP.R/D ESP trunk and ESP and Cap line sheaves.CIO saver sub on top-drive
and service rig.120 bbls Tourly fluid losses.
12:00 15:00 3.00 15.00 W.O. L 20 U PJSA Cont.to load and process 5"DP.
15.00 19:00 4.00 19.00 W.O. L 20 U 'PJSA Install mouse hole.P/U&M/U 52 stands of 5"DP and rack in derrick.
19.bo 20:00 1.00 20.00 W.O. L 20 U 'PJSA UD mouse hole.prep and set wear bushing as per Vetco.
20.00 21:00 1.00 21.00 W.O. L 4 U PJSA M/U clean out BHA and RIH to 70'.
21:00 00:00 3.00 24.00 W.O. L 4 U 'PJSA Single in hole w/5"DP f/70'-2216',110k puwl sow.Fill pipe @ 1936'@ 5 bpm,130 psi.144 bbls Tourty fluid losses.
Daily Contacts
Position _ Contact Name Company Title E-mail Office Mobile
Eni representative Mike Ross ENI Senior Drilling Supv SIDDnlling@enipetroleum.com 907-685-0715
Eni representative Russ Wimmer ENI Drilling Supv. SIDDrilling@enipetroleum.com 907-685-0715 907-320-0058
Eni representative Ben Perry ENI Senior Drilling Supv 907-685-0715
Eni representative Mitch Billington ENI Rig Clerk AKRigClerksDoyon15@enipetroleum.com 907-685-0722
Eni representative Vance Dale ENI Malls Coordinator
Eni representative Jack Kvasnikoff ENI HSE 907-685-0721 907-398-8770
Eni representative 'Jeremey Decker ENI Expediter eniexpeditor@gmail.com 907-980-7545 907-980-7545
Tool Push Steve Dambacher Doyon Drilling Tool Pusher rig15@doyondrilling.com 907-685-0716
Tool Push Pete Martinusen Doyon Drilling Tour Pusher rig15@doyondrilling.com 907-685-0716
Last Casing seat
Cas.Type OD(in) ID(in) Grade Top)ftKB) Bottom(ftKB) Run Date
LINER 5 112 4.950 L-80 11,771.0 20,675.0 1/17/2013
Last Leakoff Test
Depth(ftKB) TVD(ftKB) Fluid Type Fluid Density(Ib/gal) P Surf Applied(psi) Eq.Mud Weight(lb/gal) Leak Off Pressure(psi)
12.030.0 3,999.27 OBM 9.40 730.0 12.91 2,682.9
•
Eni E&P Division 'Well Name:SP05-FN7 OR
ENI Petroleum Co.Inc. Daily Report Well Code:26944
Field Name:NIKAITCHUQ
• API/UWI:50-629-23481-00-00
2^ Date:12/23/2014 - Report#: 7
In II page 1 of 1 Wellbore name: SP05-FN7
Well Header
Permit/Concession N° Operator ENI Share(%) Well Configuration type
212179 ENI PETROLEUM 100.00 HORIZONTAL
Rotary Table Elevation(it) Ground Level(ft) Water Depth(ft) RKB-Base Flange(ft) RKB-Tubing Spool(ft)
53.62 40.52 36.65 31.74
Rig Information
Contractor Rig Name Rig Type
DOYON RIG 15 LAND RIG
Job Information
Wellbore Job Phase Spud Date Target Depth(ftKB) Target Depth(TVD...Depth Dr.(MD)(ft) Drilling Hours(hr) Avg ROP(ft/hr) DFS(days) -
SP05-FN7 WORKOVER 737.75
Daily Information
End Depth(ftKB) End Depth(TVD)(f.. Depth Progress(ft) Drilling Hours(hr) Avg ROP(ft/hr) FOB Temperature(°F) Weather Wind
0.0 104.0 2.0 Light Snow WC-8' N @ 5 MPH
Daily summary operation
24h Summary
Single in hole 5"D.P.F/Pipe Shed F/2,216'to 10,616'MD.Filling every 2,000'.Circ.80 bbl Crude Oil and water to Rock Washer @ 210 GPM,ICP 775 PSI,FCP 500 PSI.Ream down 5"D.P.F/Derrick
F/10,616'to 11,764'MD top of Packer,400 GPM,800 PSI,80 RPM,TRQ 16K.Cont.Circ.the hole clean staging up pump rate to 400 GPM.810 PSI,RPM 40-80,TRQ 16K,Dynamic loss 38 bph.
Reciprocate D.P.F/11,755'to 11,733'MD.Monitor well @ 11,755'MD.Observe breathing,monitor well for 30 Min.Establish down trend in gains and return flow,19 bbl gained in 30 Min.Flow slowed to
a slight trickle almost static.Decision was made to BROOH.BROOH as per K&M schedule F/11,755'to 11,670'MD 360 GPM,810 PSI,100 RPM,TRO 15K.Due to excessive crude contamination.
decision was made to weight up to 8.95 ppg.Circ.and weight up @ 150 GPM,470 PSI,40 RPM,TRQ 11K.HST 200K,SLK 105K,ROT 152K.Try and stage up pump rate as Shakers will allow.
Operation at 07.00
BROOH @ 11,117'MD
24h Forecast
Circ.and weight up to 8.95 ppg staging up pump rate to 400 GPM to be able to BROOH.BROOH at 400 GPM,100 RPM as per K&M schedule to 8.000'MD and check for hole cleaning.If clean RIH to
11,755'MD and POOH laying down 5"D.P.Or Cont.to BROOH till hole is clean.
Lithology Shows MAASP Pressure(psi) Mud Weight(Ib/gal)
8.85
Time Log
Start End Cum
Time Time Dur(hr) Dur(hr) Phase Opr. Act. Plan Oper.Descr.
00:00 08:00 8.00 8.00 W.O. M 4 U PJSA Single in hole 5"D.P.F/Pipe Shed F/2,216'to 10,616'MD.Filling every 2,000'.HST 180K,SLK 100K.Calculated
displacement 65 bbl,actual 218 bbl.Lost 153 bbl.
08:00 08:30 0.50 8.50 W.O. M 7 U PJSA Circ.80 bbl Crude Oil and water to Rock Washer @ 210 GPM,ICP 775 PSI,FCP 500 PSI.
08:30 12:00 3.50 12.00 W.O. M 6 U PJSA Ream down 5"D.P.F/Derrick F/10,616'to 11,764'MD top of Packer,400 GPM,800 PSI,80 RPM,TRO 16K,HST
205K,SLK 105K,ROT 152K.Lost total of 223 bbl for tour.
12:00 21:30 9.50 21.50 W.O. M 7 U PJSM Cont.Circ.the hole clean staging up pump rate to 400 GPM,810 PSI,RPM 40-80,TRQ 16K,Dynamic loss 38 bph.
Reciprocate D.P.F/11,755'to 11,733'MD.
21:30 22:00 0.50 22.00 W.O. L 11 U Monitor well @ 11,755'MD.Observe breathing,monitor well for 30 Min.Establish down trend in gains and retum flow,19
bbl gained in 30 Min.Flow slowed to a slight trickle almost static.Decision was made to BROOH.
SPR @ 11,755'MD(3,974'TVD)MW 8.8 ppg
MP#1 30-360,40-480
MP#2 30-340,40-400
22:00 23:00 1.00 23.00 W.O. M 6 U PJSA BROOH as per K&M schedule F/11,755'to 11,670'MD 360 GPM,810 PSI,100 RPM,TRO 15K.Due to excessive
crude contamination,decision was made to weight up to 8.95 ppg.
23:00 00:00 1.00 24.00 W.O. M 8 U PJSA Circ.and weight up @ 150 GPM,470 PSI,40 RPM,TRQ 11K.HST 200K,SLK 105K,ROT 152K.Try and stage up
pump rate as Shakers will allow.Lost 334 bbl Brine for tour.
Daily Contacts
Position Contact Name Company Title E-mail Office Mobile
Eni representative Mike Ross ENI 'Senior Drilling Supv SIDDdlling@enipetroleum.com 907-685-0715
Eni representative Oliver Amend ENI Drilling Supv. 907-685-0715
Eni representative Ben Perry ENI Senior Drilling Supv 907-685-0715
Eni representative Mitch Billington ENI Rig Clerk AKRigClerksDoyon15@enipetroleum.com 907-685-0722
Eni representative Greg Parker ENI Matls Coordinator 907-980-7545
Eni representative Troy England ENI HOE
Eni representative Ken Bogner ENI Expediter 907-980-7545
Tool Push Steve Dambacher Doyon Drilling Tool Pusher rig15@doyondrilling.com 907-685-0716
Tool Push Pete Maninusen Doyon Dnlling Tour Pusher rig15@doyondrilling.com 907-685-0716
Last Casing seat
Cas.Type OD(in) ID(in) Grade Top(ftKB) Bottom(ftKB) Run Date
LINER 51/2 4.950 L-80 11,771.0 20675.0 1/17/2013
Last Leakoff Test
Depth(ftKB) TVD(ftKB) Fluid Type Fluid Density(Iblgal) P Surf Applied(psi) Eq.Mud Weight(Iblgal) Leak Off Pressure(psi)
12,030.0 3,999.27 OBM 9.40 730.0 12.91 2,682.9
1191*
Eni E&P Division I Well Name:SPOS-FN7 OR
EN!Petroleum Co.Inc. Daily Report Well Code:26944
Field Name:NIKAITCHUQ
• API/DWI:50-629-23481-00-00
2^ Date:12/24/2014 - Report#: 8
II II page 1 of 1 Wellbore name: SP05-FN7
Well Header
Permit/Concession N' Operator ENI Share(%) Well Configuration type
212179 ENI PETROLEUM 100.00 HORIZONTAL
Rotary Table Elevation(ft) Ground Level(ft) Water Depth(ft) RKB-Base Flange(ft) RKB-Tubing Spool(ft)
53.62 40.52 36.65 31.74
Rig Information
Contractor Rig Name Rig Type
DOYON RIG 15 LAND RIG
Job Information
Wellbore •Job Phase Spud Date Target Depth(fiKB) Target Depth(TVD...Depth Dr.(MD)(ft) Drilling Hours(hr) Avg ROP(ftlhr) DFS(days)
SP05-FN7 WORKOVER 738.75
Daily Information
End Depth(MB) End Depth(TVD)(f.. Depth Progress(ft) Drilling Hours(hr) Avg ROP(ft/hr) POE Temperature('F) Weather Wind
0.0 106.0 1.0 Overcast WC-17' N @ 12 MPH
Daily summary operation
246 Summary
Circ.and weight up to 8.95 ppg staging up pump rate F/150 GPM,to 320 GPM.BROOH as per K&M schedule F/11,670'to 7,999'MD.400 GPM,710 PSI,120 RPM,TRQ 6K,HST 150K,SLK 125K,
ROT 138K.Calculated displacement 30 bbl,actual 164 bbl.Lost 134 bbl.Circ.BU 3X as per K&M until hole is clean,400 GPM,700 PSI staging up to 450 GPM,780 PSI,120 RPM,TRQ 6K.Lost 59 bbl.
Monitor well for 10 Min.,static.RIH W/5"D.P.F/7,999'to 11,733'MD.Break Circ.and stage up pumps to 3 bpm,380 PSI.70 RPM,TRO 9K.Reciprocate F/11,733'to 11,643'MD.SIMOPS Prep Pits for
displacement.PJSM W/all essential personnel for displacement. Displace to 9.0 ppg KCL/NaCl Brine as per MI Swaco plan forward.Pump 50 bbl Hi Vis Spacer,chase W/844 bbl Brine @ 3 bpm.380
PSI,70 RPM,TRQ 9K.Stage up pump rate to 6.5 GPM,FCP 360 PSI.Lost 21 bbl during displacement.Monitor well for 10 Min.static.POOH L/D 5"D.P.to Pipe Shed F/11,727'to 9,400'MD.Total lost
for the day 368 bbl.
Operation at 07.00
POOH UD 5"D.P.@ 4,000'MD.
24h Forecast
Cont.to POOH UD 5"D.P.F/9,400'MD.UD BHA#1.R/U test Equip.and test BOPE.R/U and run 4.5"Completion.
Lithology Shows MAASP Pressure(psi) Mud Weight(Iblgal)
9.00
Time Log
Start End Cum
Time Time Dur(hr) Dur(hr) Phase Opr. Act. Plan Oper.Descr.
00.00 01:30 1.50 1.50 W.O. M 8 U PJSA Circ.and weight up to 8.95 ppg staging up pump rate F/150 GPM,to 320 GPM.
0130 08:30 7.00 8.50 W.O. M 6 U PJSA BROOH as per K&M schedule F/11,670'to 7,999'MD.400 GPM,710 PSI.120 RPM,TRO 6K HST 150K.SLK
125K,ROT 138K.Calculated displacement 30 bbl,actual 164 bbl.Lost 134 bbl
08:30 12:00 3.50 12.00 W.O. M 7 U Circ.BU 3X as per K&M until hole is clean,400 GPM,700 PSI staging up to 450 GPM,780 PSI,120 RPM,TRO 6K.Lost
59 bbl.Tour loss 230 bbl.
12.00 15:00 3.00 15.00 W.O. M 4 U PJSM Monitor well for 10 Min.,static.RIH WI 5"D.P.F/7,999'to 11,733'MD.
15.00 16:30 1.50 16.50 W.O. M 7 U Break Circ.and stage up pumps to 3 bpm,380 PSI,70 RPM,TRO 9K.Reciprocate F/11,733'10 11,643'MD.SIMOPS
Prep Pits for displacement. i
16:30 21 00 4.50 21.00 W.O. M 9 U PJSM WI all essential personnel for displacement.Displace to 9.0 ppg KCUNaCI Brine as per MI Swaco plan forward.
Pump 50 bbl Hi Vis Spacer,chase W/844 bbl Bone @ 3 bpm,380 PSI,70 RPM,TRQ 9K.Stage up pump rate to 6.5 GPM,
FCP 360 PSI,Lost 21 bbl during displacement.Monitor well for 10 Min.static.
SPR @ 11,717'MD(3,974'TVD)WI 9.0 ppg MW
MP#1 30-120,40-210
MP#2 30-100,40-180
21:00 00.00 3.00 24.00 W.O. M 4 U PJSM POOH L/D 5"D.P.to Pipe Shed F/11,727'to 9,400'MD.HST 178K,SLK 115K.Lost 138 bbl for tour.
Daily Contacts
Position Contact Name Company Title 1 E-mail Office Mobile
Eni representative Mike Ross ENI Senior Drilling Supv SIDDnlling@enipetroleum.com 907-685-0715
Eni representative Oliver Amend ENI Drilling Supv. 907-685-0715
Eni representative Ben Perry ENI Senior Drilling Supv 907-685-0715
Eni representative Bernie Leas ENI Rig Clerk akrigclerksdoyon15@enipetroleum.com 907-685-0722 907-268-9054
Eni representative Greg Parker ENI Malls Coordinator 907-980-7545
Eni representative Troy England ENI HSE
Eni representative Ken Bogner ENI Expediter 907-980-7545
Tool Push Dave Evans Doyon Drilling Tool Pusher ng15@doyondrilling.com 907-685-0716
Tool Push Pete Martinusen Doyon Drilling Tour Pusher ng15@doyondrilling.com 907-685-0716
Last Casing seat
Cas.Type OD(in) ID(in) Grade Top(RKB) Bottom(fiKB) Run Date
LINER 51/2 4,950 L-80 11.771.0 20,675.0 1/17/2013
Last Leakoff Test
Depth(fiKB) TVD(fiKB) Fluid Type Fluid Density(lb/gal) P Surf Applied(psi) Eq.Mud Weight(lb/gal) Leak Off Pressure(psi)
12,030.0 3,999.27 OBM 9.40 730.0 12.91 2,682.9
•
• ii,...*i Eni E&P Division } I Well Name:SPO5-FN7 OR I
ENI Petroleum Co.Inc. Daily Report L Well Code:26944
Field Name:NIKAITCHUO
e Date:12125/2014 - Report#: 9 API/UWI:50-629-23481-00-00
2 inn'" page 1 of 1 Wellbore name: SP05-FN7
Well Header
Permit/Concession N` Operator ENI Share(%) Well Configuration type
212179 ENI PETROLEUM 100.00 HORIZONTAL
Rotary Table Elevation(ft) Ground Level(ft) Water Depth(ft) RKB-Base Flange(ft) RKB-Tubing Spool(ft)
3.62 40.52 36.65 31.74
Rig Information
Contractor Rig Name Rig Type
DOYON RIG 15 LAND RIG
Job Information
Wellbore Job Phase Spud Date Target Depth(ftKB) Target Depth(TVD...Depth Dr.(MD)(ft) Drilling Hours(hr) Avg ROP(fUhr) DFS(days)
SP05-FN7 WORKOVER 739.75
Daily Information
End Depth(ftKB) End Depth(TVD)(f.. Depth Progress(ft) Drilling Hours(hr) Avg ROP(ft/hr) POB Temperature(°F) Weather Wind
0.0 111.0 -4.0 Overcast WC-27° N @ 17 MPH
Daily summary operation
24h Summary
POOH and rack back in Derrick F/9,400'to 7,072'MD.HST 150K,SLK 120K.POOH laying down 5"D.P.to Pipe Shed F/7,072'to BHA.Calculated displacement 72 bbl,actual 127 bbl,lost 55 bbl.UD
Jars,XO,Bit Sub and Bit.Clean and clear rig floor.Pull Wear Bushing and install test plug as per Vetco Grey Rep onsite.R/U test Equip.Test BOPE:Test W/4.5"and 5"test joint.Test Annular Preventer
to 250 PSI low and 2,500 PSI high.Test Upper and Lower Rams,TIW Valve,IBOP,Choke Manifold 1-14 valves,Upper and lower IBOP,Dart Valves,Blend Rams,Choke and Kill HCR and manual
valves all done to 250 PSI low and 3,500 PSI high for 5 Min.all on chart.Function test Koomey:Before System Press.3,000 PSI,Manifold Press.1,450 PSI,Annular Press.750 PSI.After function
System Press.1,475 PSI,Annular Press.750 PSI,Manifold Press.1,450 PSI,200 PSI increase 44 Sec.Full charge 200 Sec.Average Nitrogen 5 bottles 2,400 PSI.Test Manual Choke and Super Choke
to 1,500 PSI.Pull test plug as per Vetco Grey Rep onsite.Blow down and R/D test Equip.PJSM W/all essential personnel.P/U GBR&Centerlift tools to rig floor for 4.5"Completion. R/U ESP&Capilary
sheave and string up lines.PJSM W/all essential personnel.P/U M/U Gas Dispersion Tube,7"Shroud,Motor Shroud Hanger,Perf Housing,Joint#1,7"Centralizer,Pups and DGU. M/U Pump Assy W/
Halliburton ELine.R/U ELine,Set pump verified by CO Rep onsite.Set Tubing Stop&test tool.Test Pack Off to 1,000 PSI for 15 Min on chart.R/D ELine.POOH and set back pump.M/U and dress
Motor Assy.Fill motor W/oil.Pull Capular line over sheave.Total loss today 151 bbl.
Operation at 07.00
RIH With 4.5"Tubing As Per Tally.
24h Forecast
Cont.to pull ESP and Capular lines over sheave.Make CAP and ESP connection.P/U M/U Pump Assy.R/U GBR and RIH 4.5"Tubing as per tally.
Lithology Shows MAASP Pressure(psi) Mud Weight(lb/gal)
9.00
Time Log
Start End Cum
Time Time Dur(hr) Dur(hr) Phase Opr. Act. Plan Oper.Descr.
00:00 01:00 1.00 1.00 W.O. M 4 U PJSA POOH and rack back in Derrick F/9,400'to 7,072'MD.FIST 150K,SLK 120K
01:00 06:30 5.50 6.50 W.O. M 4 U PJSA POOH laying down 5"D.P.to Pipe Shed F/7,072'to BHA.Calculated displacement 72 bbl,actual 127 bbl,lost 55
bbl.
06:30 07:00 0.50 7.00 W.O. M 4 U PJSA UD Jars,XO,Bit Sub and Bit.Clean and clear rig floor.
07:00 07:30 0.50 7.50 W.O. C 20 P PJSA Pull Wear Bushing and install test plug as per Vetco Grey Rep onsite.
07:30 08:30 1.00 8.50 W.O. C 20 U PJSA R/U test Equip.
08:30 12:30 4.00 12.50 W.O. C 12 U PJSA Test BOPE:Test W/4.5"and 5"test joint.Test Annular Preventer to 250 PSI low and 2,500 PSI high.Test Upper j/�
and Lower Rams,TIW Valve,IBOP,Choke Manifold 1-14 valves,Upper and lower IBOP,Dart Valves,Blend Rams,Choke
and Kill HCR and manual valves all done to 250 PSI low and 3,500 PSI high for 5 Min.all on chart.Function test Koomey:
Before System Press.3,000 PSI,Manifold Press.1,450 PSI,Annular Press.750 PSI.After function System Press.1,475
PSI,Annular Press.750 PSI,Manifold Press.1,450 PSI,200 PSI increase 44 Sec.Full charge 200 Sec.Average Nitrogen
5 bottles 2,400 PSI.Test Manual Choke and Super Choke to 1,500 PSI.
12:30 13:00 0.50 13.00 W.O. C 20 U PJSA Pull test plug as per Vetco Grey Rep onsite.Blow down and R/D test Equip.
-
13:00 14:00 1.00 14.00 W.O. K 20 P PJSM W/all essential personnel.P/U GBR&Centerlift tools to rig floor for 4.5"Completion.
14:00 15:00 1.00 15.00 W.O. K 20 P PJSM R/U ESP 8 Capilary sheave and string up lines.
15:00 17:30 2.50 17.50 W.O. K 4 P PJSM W/all essential personnel.P/U WU Gas Dispersion Tube,7"Shroud,Motor Shroud Hanger,Perf Housing,Joint#1.
7"Centralizer.Pups and DGU.
17:30 18:00 0.50 18.00 W.O. K 20 P PJSA M/U Pump Assy W/Halliburton ELine.
18:00 20:00 2.00 20.00 W.O. K 20 P PJSM R/U ELine,Set pump verified by CO Rep onsite.Set Tubing Stop&test tool.Test Pack Off to 1,000 PSI for 15 Min
on chart.R/D ELine.
20:00 00:00 4.00 24.00 W.O. K 20 P POOH and set back pump.M/U and dress Motor Assy.Fill motor WI oil.Pull Capular line over sheave.Lost 96 bbl for tour.
Daily Contacts
Position Contact Name Company Title E-mail Office Mobile
Eni representative Mike Ross ENI Senior Dolling Supv SIDDrilling@enipetroleum.com 907-685-0715
Eni representative Oliver Amend ENI Drilling Supv. 907-685-0715
Eni representative Ben Perry ENI Senior Drilling Supv 907-685-0715
Eni representative Bernie Leas ENI Rig Clerk akrigclerksdoyon15@enipetroleum.com 907-685-0722 907-268-9054
Eni representative Greg Parker ENI Malls Coordinator 907-980-7545
Eni representative Troy England ENI HSE
Eni representative Ken Bogner ENI Expediter 907-980-7545
Tool Push Dave Evans Doyon Dulling Tool Pusher dg15@doyondriling.com 907-685-0716
Tool Push Pete Martinusen Doyon Dulling Tour Pusher rig15@doyondrilling.com 907-685-0716
Last Casing seat
Can.Type OD(in) ID(in) Grade Top(ftKB) Bottom(ftKB) Run Date
LINER 51/2 4.950 L-80 11,771.0 20675.0 1/17/2013
Last Leakoff Test
Depth(ftKB) TVD(ftKB) Fluid Type Fluid Density(Ib/gal) P Surf Applied(psi) Eq.Mud Weight(lb/gal) Leak Off Pressure(psi)
12.030.0 3,999.27 OBM 9.40 730.0 12.91 2,682.9
Eni E&P Division I Well Name:SP05-FN7 OR
ENI Petroleum Co.Inc. Daily Report Well Code:26944
Field Name:NIKAITCHUQ
2^fl91* Date:12/26/2014 - Report#: 10 API/UWI:50-629-23481-00-00
I� II II
page 1 of 1 Wellbore name: SP05-FN7
Well Header
Permit/Concession N° Operator ENI Share(%) Well Configuration type
212179 ENI PETROLEUM 100.00 HORIZONTAL
Rotary Table Elevation(ft) Ground Level(ft) Water Depth(ft) RKB-Base Flange(ft) RKB-Tubing Spool(ft)
53.62 40.52 36.65 31.74
Rig Information
Contractor Rig Name Rig Type
DOYON RIG 15 LAND RIG
Job Information
Wellbore Job Phase Spud Date Target Depth(ftKB) Target Depth(TVD...Depth Dr.(MD)(ft) Drilling Hours(hr) Avg ROP(ft/hr) DFS(days)
SP05-FN7 WORKOVER 740.75
Daily Information
End Depth(ftKB) End Depth(TVD)(f.. Depth Progress(ft) Drilling Hours(hr) Avg ROP(ftlhr) POB Temperature(°F) Weather Wind
0.0 106.0 -10.0 Overcast WC-28" NW @ 10 MPH
Daily summary operation
24h Summary
PJSM W/all essential personnel.Connect capular lines and ESP on MGU.Terminate tech wire on DGU.R/U Volant CRT as per GBR Rep onsite.M/U Joint#2 RIH to 172'MD.Pull ESP line over sheave.
Splice ESP and Capular line as per Centerlift Rep and ENI electrician onsite.RIH 4.5"H563 12.6#L-80 F/172'to 1,000'MD.After running 1,000',stopped to perform cable test.Found two legs open on
the faze to faze and 1 weak leg on the faze to ground test.Decision was made to POOH.R/D Volant CRT and Equip.Load Csg.Tongs and Equip to rig floor and Prep to POOH.POOH 4.5"Tubing F/
1,000'to 172'MD.Inspect ESP to motor lead Gator splice.Found connection compromised.Simson tested motor lead and ESP spool.All tests good.Cut out and replace motor lead to ESP Gator splice.
R/D and L/D Csg.Equip.R/U Volant CRT tools and Equip.RIH W/4.5"Tubing F/172'to 1,000'MD.PJSM W/all essential personnel.Inspect ESP 8 Capular lines.Inspect Equip,service TDS-8 and
Drawworks.RIH WI 4.5"Tubing F/1,000'to 2,008'MD and lest ESP and Capular every 1,000'.
Operation at 07.00
RIH 4.5"Tubing @ 3,504'MD.
24h Forecast
Cont.to RIH W/4.5"Tubing F/2,008'to 10,569'MD testing ESP and Capular every 1.000'.
Lithology Shows MAASP Pressure(psi) Mud Weight(Iblgal)
9.00
Time Log
Start End Cum
Time Time Dur(hr) Dur(hr) Phase Opr. Act. Plan Oper.Descr.
00:00 04.00 ' 4.00 4.00 W.O. K 20 P PJSM W/all essential personnel.Connect capular lines and ESP on MGU.Terminate tech wire on DGU.R/U Volant CRT
as per GBR Rep ensile.M/U Joint#2 RIH to 172'MD.
04:00 07:30 3.50 7.50 W.O. K 20 P PJSA Pull ESP line over sheave.Splice ESP and Capular line as per Centerlift Rep and ENI electrician onsite.
07:30 09:30 2.00 9.50 W.O. K 4 P PJSA RIH 4.5"H563 12.6#L-80 F/172'to 1.000'MD.
09:30 10:30 1.00 10.50 W.O. K 12 P After running 1,000',stopped to perform cable test.Found two legs open on the faze to faze and 1 weak leg on the faze to w
ground test.Decision was made to POOH.
10:30 12:00 1.50 12.00 W.O. K 20 TD03 PJSM R/D Volant CRT and Equip.Load Csg.Tongs and Equip to rig floor and Prep to POOH.
12:00 13:30 1.50 13.50 W.O. K .'4 TD03 PJSM POOH 4.5"Tubing F/1,000'to 172'MD.
13:30 16.30 3.00 16.50 W.O. K 20 TD03 Inspect ESP to motor lead Gator splice.Found connection compromised.Simson tested motor lead and ESP spool.All
tests good.Cut out and replace motor lead to ESP Gator splice.
16:30 17.30 1.00 17.50 W.O. K 20 TD03 PJSA R/D and L/D Csg.Equip.R/U Volant CRT tools and Equip.
17:30 19:30 2.00 19.50 W.O. K 4 P PJSA RIH W/4.5"Tubing F/172'to 1,000'MD.
19:30 21:00 1.50 21.00 W.O. K 20 P PJSM W/all essential personnel.Inspect ESP 8 Capular lines.Inspect Equip.service TDS-8 and Drawuvrks.
21:00 00:00 3.00 24.00 W.O. K 4 P PJSA RIH W/4.5"Tubing F/1,000'to 2,008'MD and test ESP and Capular every 1,000'.
Daily Contacts
Position Contact Name Company Title E-mail Office Mobile
Eni representative Mike Ross ENI Senior Drilling Supv SIDDrilling@enipetroleum.com 907-685-0715
Eni representative Oliver Amend ENI Drilling Supv. 907-685-0715
Eni representative Ben Perry ENI Senior Drilling Supv 907-685-0715
Eni representative Bernie Leas ENI Rig Clerk akrigclerksdoyonl5@enipetroleum.com 907-685-0722 907-268-9054
Eni representative Greg Parker ENI Malls Coordinator 907-980-7545
Eni representative Troy England ENI HSE
Eni representative Ken Bogner ENI Expediter 907-980-7545
Tool Push Dave Evans Doyon Drilling Tool Pusher rig15@doyondrilling.com 907-685-0716
Tool Push Pete Martinusen Doyon Drilling Tour Pusher rig15@doyondrilling.com 907-685-0716
Last Casing seat
Cas.Type OD(in) ID(in) Grade Top(ftKB) Bottom(ftKB) Run Date
LINER 51/2 4.950 L-80 11,771.0 20,675.0 1/17/2013
Last Leakoff Test
Depth(f1KB) TVD(ftKB) Fluid Type Fluid Density(1b/gall P Surf Applied(psi) Eq.Mud Weight(lb/gal) Leak OH Pressure(psi)
12,030.0 3,999.27 OBM 9.40 730.0 12.91 2,682.9
Eni E&P Division I Well Name:SP05-FN7 OR
0111* ENI Petroleum Co.Inc. Daily Report Well Code:26944
Field Name:NIKAITCHUO
•
Date:12/27/2014 - Report#: 11 APIIUWI:50-629-23481-00-00
2" " page 1 of 1 Wellbore name: SP05-FN7
Well Header
Permit/Concession N° Operator ENI Share(%( Well Configuration type
212179 ENI PETROLEUM 100.00 HORIZONTAL
Rotary Table Elevation(ft) Ground Level(ft) Water Depth(ft) RKB-Base Flange(ft) RKB-Tubing Spool(ft)
53.62 40.52 36.65 31.74
Rig Information
Contractor Rig Name Rig Type
DOYON RIG 15 LAND RIG
Job Information
Wellbore Job Phase Spud Date Target Depth(ftKB) Target Depth(TVD...Depth Dr.(MD)(ft) Drilling Hours(hr) Avg ROP(ft/hr) DFS(days)
SP05-FN7 WORKOVER 741.75
Daily Information
End Depth(ftKB) End Depth(TVD)(f.. Depth Progress(ft) Drilling Hours(hr) Avg ROP(ft/hr) POE Temperature(°F) Weather Wind
0.0 106.0 -14.0 Partly Cloudy WC- ENE @ 28 MPH
45"
Daily summary operation
24h Summary
RIH 4.5"Tubing FI 2,008'to 7,848'MD testing every 500'.Cont.RIH FI 3.499'to 4,914'MD testing every 1,000'.C/O ESP spool and Cont,trip to 8,171'MD.Install spool to spool Gator splice and test.
Cont.to RIH 4.5"Tubing F/8,171'to 10,525'MD testing every 1,000'.P/U M/U Hanger X/O as per Vetco Grey Rep onsite and CO Rep.L/D Volant CRT and Equip.M/U Hanger W/BPV installed.Prep
Hanger and install Penetrator and Capular Tube Assy.Prep and M/U ESP Gator splice for the Penetrator as per Baker and ENI Electrician Rep onsite.Land Hanger as per Vetco Grey Rep onsite.Lost
150 bbl today.
Operation at 07.00
N/D BOPE
24h Forecast
Run in lock down screws and test Hanger seals.N/D Stack and N/U Tree.Test Tree and Freeze Protect IA.Move Rig.
Lithology Shows MAASP Pressure(psi) Mud Weight(Iblgal)
9.00
Time Log
Start End Cum
Time Time Dur(hr) Dur(hr) Phase Opr. Act. Plan Oper.Descr.
00:00 06:00 6.00 6.00 W.O. K 4 P PJSA RIH 4.5"Tubing F/2,008'to 3,499'MD testing every 500'.Cont.RIH P/3,499104,914'MD testing every 1,000'.
06:00 12:00 6.00 12.00 W.O. K 4 P RIH 4.5"Tubing F/4,914'to 7,698'MD testing every 1,000'.
12:00 13:30 1.50 13.50 W.O. K 4 P RIH 4.5"Tubing F/7,698'to 7,848'MD testing every 1,000'.C/O ESP spool and Cont.trip to 8,171'MD.
13:30 16:00 2.50 16.00 W.O. K 20 P PJSA Install spool to spool Gator splice and test.
16:00 20:30 4.50 20.50 W.O. K 4 P PJSA RIH 4.5"Tubing F/8,171'to 10,525'MD testing every 1.000'.
20:30 21:00 0.50 21.00 W.O. K 4 P PJSA P/U M/U Hanger X/O as per Vetco Grey Rep onsite and CO Rep.L/D Volant CRT and Equip.M/U Hanger W/BPV
installed.
21:00 00:00 3.00 24.00 W.O. K 20 P PJSA Prep Hanger and install Penetrator and Capular Tube Assy.Prep and M/U ESP Gator splice for the Penetrator as per
Baker and ENI Electrician Rep onsite.Land Hanger as per Vetco Grey Rep onsite.
Daily Contacts
Position Contact Name Company ITitle E-mail Office Mobile
Eni representative Mike Ross ENI Senior Drilling Supv SIDDrilling@enipetroleum.com 907-685-0715
Eni representative Oliver Amend ENI Drilling Supv. 907-685-0715
Eni representative Ben Perry ENI Senior Drilling Supv 907-685-0715
Eni representative Bernie Leas ENI Rig Clerk akrigclerksdoyon15@enipetroleum.com 907-685-0722 907-268-9054
Eni representative Greg Parker ENI Malls Coordinator 907-980-7545
Eni representative Troy England ENI HSE
Em representative Ken Bogner ENI Expediter 907-980-7545
Tool Push Dave Evans Doyon Drilling Tool Pusher rig15@doyondrilling.com 907-685-0716
Tool Push Pete Martinusen Doyon Drilling Tour Pusher rig15@doyondrilling.com 907-685-0716
Last Casing seat
Cas.Type OD(in) ID(in) Grade Top(ftKB) Bottom(ftKB) Run Date
LINER 51/2 4.950 L-80 11,771.0 20,675.0 1/17/2013
Last Leakoff Test
Depth(RKB) TVD(ftKB) Fluid Type Fluid Density(Iblgal) P Surf Applied(psi) Eq.Mud Weight(lb/gal) Leak Off Pressure(psi)
12,030.0 3.999.27 OBM 9.40 730.0 12.91 2,682,9
• r. # Eni E&P Division I Well Name:SPOS-FN7 OR
ENI Petroleum Co.Inc. Daily Report Well Code:26944
Field Name:NIKAITCHUQ
• API/UWI:50-629-23481-00-00
2�, Date:12/28/2014 - Report#: 12
(I 'I11
page 1 of 1 Wellbore name: SP05-FN7
Well Header
Permit/Concession N° Operator ENI Share(%) Well Configuration type
212179 ENI PETROLEUM 100.00 HORIZONTAL
Rotary Table Elevation(ft) Ground Level(ft) Water Depth(ft) RKB-Base Flange(ft) RKB-Tubing Spool(ft)
53.62. 40.52 36.65 31.74
Rig Information
Contractor Rig Name Rig Type
DOYON RIG 15 LAND RIG
Job Information
Wellbore Job Phase Spud Date Target Depth(ftKB) Target Depth(TVD...Depth Dr.(MD)(ft) Drilling Hours(hr) Avg ROP(ft/hr) DFS(days)
SP05-FN7 WORKOVER 742.75
Daily Information
End Depth(ftKB) End Depth(TVD)(t.. Depth Progress(ft) Drilling Hours(hr) Avg ROP(ft/hr) POB Temperature(°F) Weather Wind
0.0 110.0 1.0 Overcast WC-23' E @ 25 MPH
Daily summary operation
24h Summary
PJSA.Run in hanger lock downs.Test upper and lower hanger seals to 5000 PSI f/10 mins wNetco Rep onsite.Witnessed by Driller.Test was good.
PJSA.Nipple down BOPE.Clean and clear rig floor of all completion equipment.PJSA.Nipple up tree.Test tree,tubing hanger/packoff void to 5000 PSI.Charted wNetco Rep onsite.Check ESP
cable/motor integrity by Baker Rep(all tests are good).Pulled test plug and secured well.PJSA.Prep for rig move.Clean pits and rock washer.Prep well bays for rig move.Lay Herculite and matting
boards.Break lines apart.
Operation at 07.00
Moving ng to SP31-W7. FINAL WORKOVER REPORT
24h Forecast
Move rig to well SP31-W7.
Lithology Shows MAASP Pressure(psi) Mud Weight(Iblgal)
9.00
Time Log
Start End Cum
Time Time Dur(hr) Dur(hr) Phase Opr. Act. Plan Oper.Descr.
00:00 01:30 1.50 1.50 W.O. K 12 P PJSA.Run in hanger lock downs.Test upper and lower hanger seals to 5000 P51 f/10 mins wNetco Rep onsite.Witnessed
by Duller.Test was good.
01:30 04:00 2.50' 4.00 W.O. •C 5 P PJSA.Nipple down BOPE.Clean and clear rig floor of all completion equipment.
04.00 09:00 5.00 9.00 W.O. C 5 P PJSA.Nipple up tree.Test tree,tubing hanger/packoff void to 5000 PSI.Charted wNetco Rep onsite.Check ESP
cable/motor integrity by Baker Rep(all tests are good).Pulled test plug and secured well.
09:00 12:00 3.00 12.00 W.O. A 1 P PJSA.Prep for rig move.Clean pits and rock washer.Prep well bays for rig move.Lay Herculite and matting boards.Break
lines apart.
Daily Contacts
Position i Contact Name Company Title E-mail Office Mobile
Eni representative Mike Ross -ENI Senior Drilling Supv SIDDrilling@enipetroleum.com 907-685-0715
Eni representative Oliver Amend ENI Dulling Supv. 907-685-0715
Eni representative Ben Perry ENI Senior Drilling Supv 907-685-0715
Eni representative Bernie Leas ENI Rig Clerk akrigclerksdoyon15@enipetroleum.com 907-685-0722 907-268-9054
Eni representative Greg Parker ENI Matls Coordinator 907-980-7545
Eni representative Troy England ENI HSE
Eni representative Ken Bogner ENI Expediter 907-980-7545
Tool Push Dave Evans Doyon Drilling Tool Pusher rig15@doyondrilling.com 907-685-0716
Tool Push Pete Martinusen Doyon Drilling Tour Pusher ng15@doyondnlling.com 907-685-0716
Last Casing seat
Cas.Type OD(in) ID(in) Grade Top(ftKB) Bottom(ftKB) Run Date
LINER 51/2 4.950 L-80 11.771.0 20,675.0 1/17/2013
Last Leakoff Test
Depth(ftKB) TVD(ftKB) Fluid Type Fluid Density(Ib/gal) P Surf Applied(psi) Eq.Mud Weight(lb/gal) Leak Off Pressure(psi)
12.030.0, 3,999.27 OBM 9.40 730.0 12.91 2.682.9
Technical Report Title
Date
Client: ENI Petroleum
Field: Nikaitchuq
Rig: Doyon 15
Date: January 24, 2013
Surface Data Logging
End of Well Report
SP05-FN7
TABLE OF CONTENTS
1. General Information
2. Daily Summary
3. Morning Reports
4. Bit Record
5. Mud Record
6. Show Reports
7. Formation Tops
8. Survey Report
9. Days vs. Depth
Digital Data to include:
Final Logs
Halliburton Log Viewer
EMF Log Viewer
End of Well Report in PDF format
ADI Backup
GENERAL WELL INFORMATION
Company: Eni Petroleum
Rig: Doyon 15
Well: SP05-FN7 & SP05-FN7 PB1
Field: Nikaitchuq
Borough: North Slope Borough
State: Alaska
Country: United States
API Number: 50-629-23481-00-00 (SP05-FN7)
50-629-23481-70-00 (SP05-FN7 PB1)
Sperry Job Number: AK-AM-0900072075
Job Start Date: 13 Dec 2012
Spud Date: 16 Dec 2012
Total Depth: 21,230’ MD, 3733’ TVD
North Reference: True
Declination: 20.153°
Dip Angle: 81.071°
Total Field Strength: 57616.514 nT
Date Of Magnetic Data: 25 Nov 2011
Wellhead Coordinates N: North 70° 33’ 28.186”
Wellhead Coordinates W: West 149° 54’ 14.308“
Drill Floor Elevation: 53.62’
Ground Elevation: 13.1’
Permanent Datum: Mean Sea Level
SDL Engineers: Emi l Opitz, Kori Jo Plowman,
Leigh Ann Rasher, Paris Ervin
Company Geologist: Andrew Buchanan
Company Representatives: Jack Keener, Mike Ross
SSDS Unit Number: 110
DAILY SUMMARY
Begin SP05-FN7
12/13/2012
Rig is being moved. Mudloggers are on standby.
12/14/2012
Mudloggers rigged up. Load pipe shed with 5” drill pipe
12/15/2012
Mudloggers finished rigging up and calibrated gas equipment. Finish picking up 5” drill pipe
12/16/2012
Pick up BHA #1. Clean out Conductor. Make up BHA #2. Pull out of hole to pick up 8” Flex collar and jars.
Drill ahead.
12/17/2012
Continue to drill ahead.
12/18/2012
Continue to drill ahead to surface TD of 3925’ MD. Back ream out of hole per K&M.
12/19/2012
Continue to back ream out of hole. Lay down BHA #2 and rig up casing equipment. Run in hole with 13
3/8” casing.
12/20/2012
Continue to run in hole with 13 3/8” casing to 3912’ MD. Circulate bottoms up. Cement casing and lay
down landing joint. Nipple down BOPE.
12/21/2012
Nipple up BOPE, load 252 joints of drill pipe in shed and clean mud pits. Inspect and change out
damaged suction rubber and rock washer. Load intermediate hole section in pipe shed and pick up 5” drill
pipe, make up 10 stands and rack back. Pick up 5” test joint and install test plug in well head. Rig up to
test BOPE. Test annular, choke manifold valve and kill line valve to 2500 PSI. Test BOPE. Annular, rams,
valves tested, HCR valve failed. Continue testing joint, rams, and valves. Choke valve #4 failed. Pull test
plug, drain stack, blow down, and rig down testing equipment. Rig up and pick up 5” drill pipe in mouse
hole.
12/22/2012
Continue to pick up 5” drill pipe for total of 82 stands. Install new manual kill line valve on mud cross. Lay
down mouse hole, pick up test joint and test plug, install test plug. Rig up to test BOPE. Install new saver
sub, install new HCR valve for kill line. Test new HCR valve and kill manual. Pull test plug, set wear
bushings. Make up BHA #3 and shallow hole test tools, blow down. Run in hole with 5” drill pipe filling
pipe every 20 stands.
12/23/2012
Continue to run in hole to 3800’ MD. Circulate hole clean and rig up for casing test. Test casing up to
2500 PSI for 30 minutes. Rig down and blow down from test. Drill out shoe track, circulate and condition
mud. Cont inue to drill shoe to bottom of old hole at 3925’ MD. Displace well with 9.3 ppg LSND mud. Rig
up for formation integrity test and perform formation integrity test to 13.0 ppg equivalent mud weight. Rig
down the circulation equipment and slip and cut the drill line. Drill ahead from 3945’ MD to 5292’ MD. Max
gas observed was 130 units at 4220’ MD.
12/24/2012
Drill ahead from 5292’ MD to 8373’ MD. Max gas observed was 81 units at 5636’ MD.
12/25/2012
Drill ahead from 8373’ MD to 10800’ MD. Max gas observed was 415 units at 9213’ MD.
12/26/2012
Drill ahead from 10800’ MD to intermediate TD of 12004’ MD / 3996’ TVD. Back ream out of hole to
10618’ MD, monitor well, static. Continue to back ream out of hole to 9292’ MD. Max gas observed was
1354 units at 11081’ MD.
12/27/2012
Continue to back ream out of hole per K&M.
12/28/2012
Continue to back ream out of hole to 1150’ MD. Circulate hole clean. Pull out of hole and make up BHA
#4 for logging pass. Run in hole to 12000’ MD and circulate bottoms up twice.
12/29/2012
Continue to circulate bottoms up per K&M. Pull out of hole on elevators to 11315’ MD. Perform MAD pass
from 11315’ MD to 10925’ MD. Continue to pull out of hole on elevators to 3895’ MD. Slip and cut drill line
and service rig. Continue to pull out of hole to 255’ MD, monitor well, static. Lay down BHA #4. Drain
stack, pull wear bushing, set test plug and change out rams.
12/30/2012
Continue to change out variable rams. Rig up casing equipment and float 9 5/8” casing per well plan.
12/31/2012
Continue to float 9 5/8” casing to 11989’ MD. Rig up cement head and lines. Condition the mud for
cement job. Cement casing and rig down cement equipment. Prepare to nipple down BOPE. Max gas
observed was 60 units during circulation.
01/01/2013
Nipple down BOPE and set 9 5/8” emergency slips. Install pack off and test, OK. Change out handling
equipment for 4.5” drill pipe and change out rams to variables. Freeze protect annulus and pick up 4.5”
drill pipe. Set test plug and rig up to test BOPE.
01/02/2013
Continue to test BOPE. Pick up BHA #5 and run in hole with 4.5” drill pipe to 9761’ MD. Continue to run in
hole with 5” drill pipe.
01/03/2013
Wash and ream with 5” drill pipe. Circulate and condition mud and prepare for casing test. Perform casing
test t o 3000 PSI for 30 minutes. Displace well to 9.4 FazePro mud. Slip and cut drill line, inspect brakes,
service crown, drawworks, and travelling equipment. Clean out shoe track and rat hole. Drill out new hole
from 12004’ MD to 12030’ MD. Circulate bottoms up and rig up and perform formation integrity test to
12.9 equivalent mud weight. Drill ahead to 12400’ MD. Max gas observed was 1069 units.
01/04/2013
Drill ahead from 12400’ MD to 13584’ MD. Max gas observed was 1169 units at 13335’ MD.
01/05/2013
Drill ahead from 13584’ MD to 15385’ MD. Max gas observed was 4943 units at 14835’ MD.
01/06/2013
Drill ahead from 15385’ MD to 16665’ MD. Decide to open hole sidetrack. Back ream out of hole to
16476’ MD. Kick off from 16485’ MD. Max gas observed was 973 units at 15610’ MD.
01/07/2013
Drill ahead from 16523’ MD to 17778’ MD. Max gas observed was 932 units at 16811’ MD.
01/08/2013
Drill ahead from 17778’ MD to 19860’ MD. Max gas observed was 1228 units at 19186’ MD.
01/09/2013
Drill ahead from 19860’ MD to final TD of 21230’ MD / 3733’ TVD. Back ream out of hole per K&M. Max
gas observed was 1009 units at 20286’ MD.
01/10/2013
Back ream out of hole from 21230’ MD to 12340’ MD.
01/11/2013
Continue to back ream out of hole. Circulate bottoms up four times at 9761’ MD. Cut and slip drill line and
adjust brakes. Continue to pull out of the hole on elevators. Lay down BHA#5. Pull wear ring and install
test plug. Rip up to test BOPE.
01/12/2012
Finish testing BOP’s. Pick up hole opening BHA and RIH, filling every 20 stands.
01/13/2012
Continue to RIH to bottom. Wait on weather, circulating mud and reciprocating the drill string. PHASE III
CONDITIONS.
01/14/2012
Continue to wait on weather, circulating mud and reciprocating drill string. PHASE III CONDITIONS.
01/15/2013
Continue to wait on weather, circulating mud and reciprocating drill string. PHASE III CONDITIONS.
After weather cleared up, pump and spot FazeAway breaker on bottom. POOH per K&M rep.
01/16/2012
Continue to POOH to 11775’ MD. Displace OBM to Brine. POOH on elevators. L/D hole opening BHA.
R/U to RIH with 5.5” slotted liner.
01/17/2012
RIH w/ 5.5” slotted liner.
01/18/2013
Finish RIH w/ 5.5” slotted liner. L/D 5” Drill pipe.
01/19/2013
Finish L/D Drill Pipe. R/U for 4.5” tubing run.
.
.
Density (ppg) Viscosity
out (sec/qt)
ROP
Set AtSize
178.9 X-65
Bit #
Current
in cP
Area:
Location:
Grade
Silt Siltst
4.23
Tuff
Footage
ROP (ft/hr)
Bit Type
96% Gallons/stroke @
Lst
EVAMAR
Weight
TFA
pH
%
MBT
Flow In (spm)
Flow In (gpm)
Hours
SPP (psi)
9.40
(ppb Eq)
Mud Data
160'
PV
22.5 28
Size
160'
160'
0'
Current Pump & Flow Data:
Current Depth:
24 Hour Progress:
$7,610.00
P/U 5" DP
Yesterday's Depth:
Rig Activity:$2,810.00
Keener/Amend/BuchananReport For:
Daily Charges:
Max @ ft
3.0
Casing
Summary
WOB
33
Make
160'
Ss
20"
ShClystCly
Customer:
Well:
Avg
MWD Summary Depth
160' to 160'
Rig:
Total Charges:
Eni Petroleum
Chlorides
SP05-FN7
Spy Island
24 hr Max
North Slope
Doyon 15
AK-AM-0900072075Job No.:
1
15-Dec-2012
24:00Time:
Report #:
Date:
(current)
Cht Lithology (%)
YP
8.60
(lb/100ft2)
135
Condition
Spud Mud
Depth Mud Type mg/l
Coal Gvl
API FL
6.5
Cor Solids
ml/30min
RPM
ECD
(ppg)
Avg
1,500
Depth in / out
Tools Min Max
* 10000 units = 100% Gas In Air
Logging Engineers:Emil Opitz / Kori Jo Plowman
Connection
0
0
C-3
0
0
0
C-5n
(current)
Report By:
(max)
Emil Opitz
0
(max)
Chromatograph (ppm)
0
0
C-1
0
Minimum
C-4i
0
C-5iC-4nC-2
000
0
R/U diverter. Cut & slip. P/U 5" DP.
md
Average
0
Gas Summary
Units*
0
00000
Maximum
Depth
907-685-0772Unit Phone:
24 hr Recap:
TripBackground
.
.
Density (ppg) Viscosity
out (sec/qt)
Max
ml/30min
RPM
ECD
(ppg)
Avg
1,800
Depth in / out
Tools Min
8.90
mg/l
7.70
Coal Gvl
API FL
5.6
Cor Solids
9.61
Spud Mud
Depth Mud Type
Condition
YP
1
8.85
(lb/100ft2)
160'
127
(current)
Cht Lithology (%)
2
16-Dec-2012
24:00Time:
Report #:
Date:
Eni Petroleum
Chlorides
SP Motor 1.83*, GyroPulse, Telescope 825, ARC 825
SP05-FN7
Spy Island
24 hr Max
North Slope
Doyon 15
AK-AM-0900072075Job No.:
Customer:
Well:
Avg
MWD Summary Depth
160' to 875'
Rig:
Total Charges:
ShClystClySs
20"
2.3
Casing
Summary
WOB
43
Make
160'
Rig Activity:
926.2
$2,810.00
672'
Keener/Amend/BuchananReport For:
Daily Charges:
953
Max @ ft
Size
160'
875'
715'
Current Pump & Flow Data:
Current Depth:
24 Hour Progress:
$10,420.00
Drilling Ahead
Yesterday's Depth:
588 SPP (psi)
10.00
(ppb Eq)
Smith XR+ Milltooth
Mud Data
711'
PV
25.0
16"
MBT
Flow In (spm)
Hours
1.117
26
247.7
Lst
EVAMAR
Weight
TFA
pH
Flow In (gpm)
140 Gallons/stroke @
%
ROP (ft/hr)
Bit Type
96%4.23
Tuff
Footage
Silt Siltst
Grade
Area:
Location:
ROP
Set AtSize
178.9 X-65
Bit #
Current
in
161.0
cP
* 10000 units = 100% Gas In Air
21
Background -
24 hr Recap:
9 Trip
Maximum
Depth
00000
0
Units*
Average
0
Gas Summary
M/U BHA#1. Clean out Conductor. M/U BHA #2. Drill ahead.
8
md
170'
827'0
009
C-5iC-4nC-2C-1
0
Minimum
C-4i
1837
(max)
Chromatograph (ppm)
0
0
(max)
Emil Opitz
462
2
Report By:
907-685-0772Unit Phone:
C-3
0
0
0
-
C-5n
(current)
Logging Engineers:Emil Opitz / Kori Jo Plowman
Connection
0
0
.
.
Density (ppg) Viscosity
out (sec/qt)
ROP
Set AtSize
178.9 X-65
Bit #
Current
in
65.0
cP
Area:
Location:
Grade
Silt Siltst
4.23
Tuff
Footage
ROP (ft/hr)
Bit Type
96%@
%
157.6
Lst
EVAMAR
Weight
TFA
pH
Flow In (gpm)
MBT
Flow In (spm)
Hours
1.117
26
Smith XR+ Milltooth
Mud Data
2361'
PV
22.5
16"
Drilling Ahead
Yesterday's Depth:
842 SPP (psi)
9.80
(ppb Eq)
200 Gallons/stroke
1716
Max @ ft
Size
875'
2240'
1365'
Current Pump & Flow Data:
Current Depth:
24 Hour Progress:
$13,230.00
Make
160'
Rig Activity:
533.5
$2,810.00
1696'
Keener/Amend/BuchananReport For:
Daily Charges:
4.5
Casing
Summary
WOB
32
ShClystCly
Customer:
Well:
Avg
MWD Summary Depth
875' to 2240'
Rig:
Total Charges:
Eni Petroleum
Chlorides
SP Motor 1.83*, GyroPulse, Telescope 825, ARC 825
SP05-FN7
Spy Island
24 hr Max
North Slope
Doyon 15
AK-AM-0900072075Job No.:
3
17-Dec-2012
24:00Time:
Report #:
Date:
Cht Lithology (%)Ss
82
(current)
20"
YP
1
9.35
(lb/100ft2)
160'
Condition
Spud Mud
Depth Mud Type
9.87
mg/l
9.23
Coal Gvl
API FL
5.4
Cor Solids
10.82
ml/30min
RPM
ECD
(ppg)
Avg
1,800
Depth in / out
Tools Min Max
* 10000 units = 100% Gas In Air
Logging Engineers:Emil Opitz / Kori Jo Plowman
Connection
0
0
C-3
0
0
0
-
C-5n
(current)
Report By:
907-685-0772Unit Phone:
(max)
Emil Opitz
11254
17
(max)
Chromatograph (ppm)
0
0
C-1
0
Minimum
C-4i
111244
C-5iC-4nC-2
001605
0
Continue to drill ahead.
123
md
892'
1943'
Average
0
Gas Summary
0
00000
DepthUnits*
Maximum
-
24 hr Recap:
44 Trip
929
Background
.
.
Density (ppg) Viscosity
out (sec/qt)
Min Max
10.75
ml/30min
RPM
ECD
(ppg)
Avg
1,000
Depth in / out
Tools
Coal Gvl
API FL
5.5
Cor Solids
Condition
YP
1
9.30
(lb/100ft2)
160'
Spud Mud
(current)
20"
Cht Lithology (%)Ss
4
18-Dec-2012
24:00Time:
Report #:
Date:
Eni Petroleum
Chlorides
SP Motor 1.83*, GyroPulse, Telescope 825, ARC 825
SP05-FN7
Spy Island
24 hr Max
North Slope
Doyon 15
AK-AM-0900072075Job No.:
Customer:
Well:
Avg
MWD Summary Depth
2240' to 3925'
Rig:
Total Charges:
ShClystCly
5.0
Casing
Summary
WOB
38
160'
Rig Activity:
423.1
$2,810.00
3200'
Keener/Amend/BuchananReport For:
Daily Charges:
86
1685'
Current Pump & Flow Data:
Current Depth:
24 Hour Progress:
$16,040.00
Make
10.19
mg/l
9.80
Yesterday's Depth:
854 SPP (psi)
9.70
(ppb Eq)
202 Gallons/stroke
Max @ ft
2240'
3925'
Mud Data
3925'
PV
25.0
16"
BROOH
1551
Size
Depth Mud Type
MBT
Flow In (spm)
Hours
1.117
28
Smith XR+ Milltooth
229.4
Lst
EVAMAR
Weight
TFA
pH
Flow In (gpm)
@
%
ROP (ft/hr)
Bit Type
96%4.23
Tuff
Footage
Silt Siltst
Grade
Area:
Location:
ROP
Set AtSize
178.9 X-65
Bit #
Current
in cP
* 10000 units = 100% Gas In Air
427
Background 82
24 hr Recap:
29 Trip
Maximum
DepthUnits*
00000
00
Gas Summary
Continue to drill ahead to surface TD of 3925' MD. BROOH per K&M.
79
md
3415'
2582'
Average
0
002912
C-5iC-4nC-2C-1
0
Minimum
C-4i
38866
(max)
Chromatograph (ppm)
0
0
(max)
Emil Opitz
9142
27
Report By:
907-685-0772Unit Phone:
C-3
0
0
0
-
C-5n
(current)
Logging Engineers:Emil Opitz / Kori Jo Plowman
Connection
0
0
.
.
Density (ppg) Viscosity
out (sec/qt)
ROP
Set AtSize
178.9 X-65
Bit #
Current
in cP
Area:
Location:
L-80
30.0
Grade
4.23
Tuff
Footage
96%
BTC
ROP (ft/hr)
Bit Type
Silt Siltst
@
%
MBT
Flow In (spm)
Hours
1.117
30
Smith XR+ Milltooth
Mud Data
3925'
PV
25.0
16"
RIH 13 3/8" casing
Size
Depth Mud Type
Yesterday's Depth:
SPP (psi)
10.00
(ppb Eq)
Gallons/stroke
Max @ ft
3925'
3925'
0'
Current Pump & Flow Data:
Current Depth:
24 Hour Progress:
$18,850.00
Make
mg/l
Rig Activity:$2,810.00
Ross/Amend/BuchananReport For:
Daily Charges:
Flow In (gpm)
25.70
WOB
38
160'
108
EVAMAR
Weight
TFA
ShClystCly
Customer:
Well:
Avg
MWD Summary Depth
3925' to 3925'
Rig:
Total Charges:
Eni Petroleum
Chlorides
SP05-FN7
Spy Island
24 hr Max
North Slope
Doyon 15
AK-AM-0900072075Job No.:
5
19-Dec-2012
24:00Time:
Report #:
Date:
Ss
20"
Cht Lithology (%)
13 3/8"
(current)
68.0
Casing
Summary
Lst
YP
1
9.50
(lb/100ft2)
160' 3925' 3765'
Spud Mud
Condition
40.0
Coal Gvl
API FL
5.0
1-1-WT-A-E-1-NO-TD
Cor Solids
6.0
pH
ml/30min
RPM
ECD
(ppg)
Avg
900
Depth in / out
Tools Min Max
* 10000 units = 100% Gas In Air
Logging Engineers:Leigh Ann Rasher / Kori Jo Plowman
Connection
0
0
C-3
0
0
0
-
C-5n
(current)
Report By:
907-685-0772Unit Phone:Leigh Ann Rasher
0
(max)
Chromatograph (ppm)
0
0
C-1
0
Minimum
C-4i
0
C-5iC-4nC-2
000
0
md
Average
0
Gas Summary
0
00000
Units*Depth
Maximum
-
24 hr Recap:
Trip
Cont. to BROOH. L/D BHA #2 and R/U casing equip. RIH w/ 13 3/8" casing.
(max)
Background
.
.
Density (ppg) Viscosity
out (sec/qt)
Min Max
ml/30min
RPM
ECD
(ppg)
Avg
900
Depth in / out
Tools
Coal Gvl
API FL
5.2
1-1-WT-A-E-1-NO-TD
Cor Solids
5.4
pH
Condition
40.0
YP
1
9.60
(lb/100ft2)
160' 3925' 3765'
Spud Mud
(current)
68.03912'
Casing
Summary
LstCht Lithology (%)
13 3/8"
Ss
Job No.:
6
20-Dec-2012
24:00Time:
Report #:
Date:
Total Charges:
Eni Petroleum
Chlorides
SP05-FN7
Spy Island
24 hr Max
North Slope
Doyon 15
AK-AM-0900072075
Customer:
Well:
Avg
MWD Summary Depth
3925' to 3925'
Rig:
ShClystCly
25.70
WOB
14
160'
59
EVAMAR
Weight
TFA
20"
Make
mg/l
Rig Activity:$2,810.00
3925'
3925'
0'
Current Pump & Flow Data:
Current Depth:
24 Hour Progress:
$21,660.00 Ross/Amend/BuchananReport For:
Depth Mud Type
Yesterday's Depth:
SPP (psi)
9.50
(ppb Eq)
Gallons/stroke
Max @ ft
PV
24.0
16"
N/U BOPE
Size
Daily Charges:
Flow In (gpm)
Flow In (spm)
Hours
1.117
21
Smith XR+ Milltooth
Mud Data
@
%
MBT
ROP (ft/hr)
Bit Type
Silt Siltst
3925'
96%
BTC
4.23
Tuff
Footage
30.0
Grade
Area:
Location:
L-80
ROP
Set AtSize
178.9 X-65
Bit #
Current
in cP
* 10000 units = 100% Gas In Air
Background -
24 hr Recap:
Trip
Cont RIH w 13 3/8" casing to 3912' MD. Circ B/U. Cement casing and L/D landing joint. N/D BOPE, N/U BOPE.
(max)
Maximum
DepthUnits*
00000
00
Gas Summary
md
Average
0
000
0
C-5iC-4nC-1
0
Minimum
C-4iC-2
(max)
Chromatograph (ppm)
0
0
Leigh Ann Rasher
0
Report By:
907-685-0772Unit Phone:
C-3
0
0
0
-
C-5n
(current)
Logging Engineers:Leigh Ann Rasher / Kori Jo Plowman
Connection
0
0
.
.
Density (ppg) Viscosity
out (sec/qt)
ROP
Set AtSize
178.9 X-65
Bit #
Current
in cP
Area:
Location:
L-80
30.0
Grade
4.23
Tuff
Footage
96%
BTC
ROP (ft/hr)
Bit Type
Silt Siltst
3925'
@
%
MBT
Flow In (spm)
Hours
1.117
8
Smith XR+ Milltooth
Mud Data PV
0.0
16"
P/U 5" DP
Size
Daily Charges:
Flow In (gpm)
Depth Mud Type
Yesterday's Depth:
SPP (psi)
9.60
(ppb Eq)
Gallons/stroke
Max @ ft Current Pump & Flow Data:
Current Depth:
24 Hour Progress:
$25,070.00 Ross/Amend/BuchananReport For:
Make
mg/l
Rig Activity:$3,410.00
25.70
WOB
20
160'
47
EVAMAR
Weight
TFA
20"
ShClystCly
Customer:
Well:
Avg
MWD Summary Depth
3925' to 3925'
Rig:
Total Charges:
Eni Petroleum
Chlorides
SP05-FN7
Spy Island
24 hr Max
North Slope
Doyon 15
AK-AM-0900072075Job No.:
7
21-Dec-2012
24:00Time:
Report #:
Date:
3925'
3925'
0'
Ss Cht Lithology (%)
13 3/8"
(current)
68.03912'
Casing
Summary
Lst
YP
1
9.30
(lb/100ft2)
160' 3925' 3765'
Spud Mud
Condition
40.0
Coal Gvl
API FL
6.0
1-1-WT-A-E-1-NO-TD
Cor Solids
4.0
pH
ml/30min
RPM
ECD
(ppg)
Avg
600
Depth in / out
Tools Min Max
* 10000 units = 100% Gas In Air
Logging Engineers:Leigh Ann Rasher / Kori Jo Plowman
Connection
0
0
C-3
0
0
0
-
C-5n
(current)
Report By:
rockwasher. Load intermediate hole section in pipe shed & P/U 5" DP, M/U 10 stands and rack back. P/U 5" test joint and install test
907-685-0772Unit Phone:Leigh Ann Rasher
0
(max)
Chromatograph (ppm)
0
0
C-1
0
Minimum
C-4iC-2
0
C-5iC-4n
000
0
md
Average
0
Gas Summary
0
00000
Units*Depth
Maximum
-
24 hr Recap:
Trip
Cont N/U BOPE, load 252 jts of 5" DP in shed and clean mud pits. Inspect and change out damaged suction rubber &
(max)
and R/D testing equip. R/U and P/U 5" DP in mouse hole 12 stands.
valves tested, HCR kill valve failed. Cont testing joint, rams, and valves, choke valve #4 failed. Pull test plug, drain stack, blow down,
plug in well head. R/U to test BOP. Test annular, choke manifold valve, and kill line valve to 2500 PSI. Test BOP. Annular, rams,
Background
.
.
Density (ppg) Viscosity
out (sec/qt)
Min Max
12.25" 0.969
ml/30min
RPM
ECD
(ppg)
Avg
650
Depth in / out
Tools
Coal Gvl
API FL
6.0
1-1-WT-A-E-1-NO-TD
Cor Solids
4.0
pH
Condition
40.0
YP
1
9.30
(lb/100ft2)
160' 3925' 3765'
LSND
Hycalog SKHI716D-E4C PDC
(current)
68.03912'
Casing
Summary
Lst
3925'
Cht Lithology (%)
13 3/8"
Ss
Job No.:
8
22-Dec-2012
24:00Time:
Report #:
Date:
3925'
3925'
0'
Total Charges:
Eni Petroleum
Chlorides
Xceed 900, TeleScope 825, ARC 825
SP05-FN7
Spy Island
24 hr Max
North Slope
Doyon 15
AK-AM-0900072075
Customer:
Well:
Avg
MWD Summary Depth
3925' to 3925'
Rig:
ShClystCly
25.70
WOB
2
20
160'
48
EVAMAR
Weight
TFA
20"
Make
mg/l
Rig Activity:$3,410.00
Current Pump & Flow Data:
Current Depth:
24 Hour Progress:
$28,480.00 Ross/Amend/BuchananReport For:
Depth Mud Type
Yesterday's Depth:
SPP (psi)
9.60
(ppb Eq)
Gallons/stroke
Max @ ft
PV
0.0
16"
RIH w/ 5" DP
Size
Daily Charges:
Flow In (gpm)
Flow In (spm)
Hours
1.117
9
Smith XR+ Milltooth
Mud Data
@
%
MBT
ROP (ft/hr)
Bit Type
Silt Siltst
3925'
96%
BTC
4.23
Tuff
Footage
30.0
Grade
Area:
Location:
L-80
ROP
Set AtSize
178.9 X-65
Bit #
Current
in cP
* 10000 units = 100% Gas In Air
manual. Pull test plug, set wear bushing. M/U BHA #3. Shallow hole test tools, blow down. RIH w/ 5" DP fill pipe every 20 stnds.
Background -
24 hr Recap:
Trip
Cont to P/U 5" DP for total of 82 stnds. Install new manual kill line valve on mud cross. L/D mouse hole, P/U test jt and
(max)
Maximum
DepthUnits*
00000
00
Gas Summary
md
Average
0
000
0
C-5iC-4nC-1
0
Minimum
C-4iC-2
(max)
Chromatograph (ppm)
0
0
Leigh Ann Rasher
0
Report By:
test plug, install test plug. R/U to test BOP. Install new saver sub, install new HCR valve for kill line. Test new HCR valve & kill
907-685-0772Unit Phone:
C-3
0
0
0
-
C-5n
(current)
Logging Engineers:Leigh Ann Rasher / Kori Jo Plowman
Connection
0
0
.
.
Density (ppg) Viscosity
out (sec/qt)
ROP
Set AtSize
178.9 X-65
Bit #
Current
in
260.9
cP
Area:
Location:
L-80
30.0
Grade
4.23
Tuff
Footage
96%
BTC
ROP (ft/hr)
Bit Type
Silt Siltst
4943'
@
%
MBT
Flow In (spm)
Hours
1.117
12
Smith XR+ Milltooth
Mud Data PV
7.5
16"
Drill Ahead 12.25" hole
1569
Size
Daily Charges:
312.5 Flow In (gpm)
Depth Mud Type
Yesterday's Depth:
851 SPP (psi)
10.00
(ppb Eq)
202 Gallons/stroke
Max @ ft Current Pump & Flow Data:
Current Depth:
24 Hour Progress:
$31,890.00 Ross/Amend/BuchananReport For:
Make
9.95
mg/l
9.57
Rig Activity:
793.6
$3,410.00
5284'
25.70
WOB
2
26
160'
51
EVAMAR
Weight
TFA
20"
ShClystCly
5
Customer:
Well:
Avg
MWD Summary Depth
3925' to 5292'
Rig:
Total Charges:
Eni Petroleum
Chlorides
Xceed 900, TeleScope 825, ARC 825
SP05-FN7
Spy Island
24 hr Max
North Slope
Doyon 15
AK-AM-0900072075Job No.:
9
23-Dec-2012
24:00Time:
Report #:
Date:
3925'
5292'
1367'
Ss
95
3925'
Cht Lithology (%)
13 3/8"
(current)
68.03912'
Casing
Summary
Lst
YP
1
9.20
(lb/100ft2)
160' 3925' 3765'
LSND
Hycalog SKHI716D-E4C PDC
Condition
40.0
Coal Gvl
API FL
6.0
1-1-WT-A-E-1-NO-TD
Cor Solids
4.0
pH
10.17
ml/30min
RPM
ECD
(ppg)
Avg
700
Depth in / out
Tools Min Max
12.25" 0.969
* 10000 units = 100% Gas In Air
Logging Engineers:Leigh Ann Rasher / Kori Jo Plowman
Connection
0
0
C-3
0
0
0
-
C-5n
(current)
Report By:
from test. Drill out shoe track, circ & cond mud. Cont drill shoe to bottom of old hole @ 3925' MD. Displace with 9.3 ppg LSND mud.
907-685-0772Unit Phone:Leigh Ann Rasher
6136
3
(max)
Chromatograph (ppm)
0
0
C-1
0
Minimum
C-4iC-2
16374
C-5iC-4n
0023
0
49
md
4920'
4220'
Average
0
Gas Summary
0
00000
Units*Depth
Maximum
-
24 hr Recap:
20 Trip
Cont to RIH to 3800' MD. Circ hole clean, R/U for casing test. Test casing up to 2500 PSI for 30 min. R/D, blow down
(max)
midnight. Max gas observed was 130 units at 4220' MD. Lithology consist mainly of Sst w/ some Siltst.
R/U for FIT, perform FIT to 13.0 ppg EMW. R/D circ equip, slip and cut drill line. Drill ahead from 3945' MD to 5292' MD as of
130
Background
.
.
Density (ppg) Viscosity
out (sec/qt)
Min Max
12.25" 0.969
10.70
ml/30min
RPM
ECD
(ppg)
Avg
1,000
Depth in / out
Tools
Coal Gvl
API FL
4.9
1-1-WT-A-E-1-NO-TD
Cor Solids
5.0
pH
Condition
40.0
YP
1
9.30
(lb/100ft2)
160' 3925' 3765'
LSND
Hycalog SKHI716D-E4C PDC
(current)
68.03912'
Casing
Summary
Lst
85
3925'
Cht Lithology (%)
13 3/8"
Ss
Job No.:
10
24-Dec-2012
24:00Time:
Report #:
Date:
5292'
8373'
3081'
Total Charges:
Eni Petroleum
Chlorides
Xceed 900, TeleScope 825, ARC 825
SP05-FN7
Spy Island
24 hr Max
North Slope
Doyon 15
AK-AM-0900072075
Customer:
Well:
Avg
MWD Summary Depth
5292' to 8373'
Rig:
ShClystCly
15
25.70
WOB
2
29
160'
57
EVAMAR
Weight
TFA
20"
Make
10.37
mg/l
10.00
Rig Activity:
504.9
$3,410.00
5292'
Current Pump & Flow Data:
Current Depth:
24 Hour Progress:
$35,300.00 Ross/Amend/BuchananReport For:
Depth Mud Type
Yesterday's Depth:
901 SPP (psi)
9.80
(ppb Eq)
213 Gallons/stroke
Max @ ft
PV
12.5
16"
Drill Ahead 12.25" hole
2239
Size
Daily Charges:
310.6 Flow In (gpm)
Flow In (spm)
Hours
1.117
17
Smith XR+ Milltooth
Mud Data
@
%
MBT
ROP (ft/hr)
Bit Type
Silt Siltst
7903'
96%
BTC
4.23
Tuff
Footage
30.0
Grade
Area:
Location:
L-80
ROP
Set AtSize
178.9 X-65
Bit #
Current
in
260.9
cP
* 10000 units = 100% Gas In Air
81
Background -
24 hr Recap:
6 Trip
Drill ahead from 5292' MD to 8373' MD. Max gas observed was 81 units at 5636' MD.
(max)
Maximum
DepthUnits*
00000
00
Gas Summary
14
md
8227'
5636'
Average
0
0057
9027
C-5iC-4nC-1
0
Minimum
C-4iC-2
(max)
Chromatograph (ppm)
0
0
Leigh Ann Rasher
1564
2
Report By:
907-685-0772Unit Phone:
C-3
0
0
0
-
C-5n
(current)
Logging Engineers:Leigh Ann Rasher / Kori Jo Plowman
Connection
0
0
.
.
Density (ppg) Viscosity
out (sec/qt)
ROP
Set AtSize
178.9 X-65
Bit #
Current
in
343.2
cP
Area:
Location:
L-80
30.0
Grade
4.23
Tuff
Footage
96%
BTC
ROP (ft/hr)
Bit Type
Silt Siltst
10405'
@
%
MBT
Flow In (spm)
Hours
1.117
15
Smith XR+ Milltooth
Mud Data PV
15.0
16"
Drill Ahead 12.25" hole
2485
Size
Daily Charges:
303.4 Flow In (gpm)
Depth Mud Type
Yesterday's Depth:
901 SPP (psi)
9.80
(ppb Eq)
213 Gallons/stroke
Max @ ft Current Pump & Flow Data:
Current Depth:
24 Hour Progress:
$38,710.00 Ross/Amend/BuchananReport For:
Make
10.52
mg/l
10.27
Rig Activity:
517.4
$3,410.00
8562'
25.70
WOB
2
25
160'
51
EVAMAR
Weight
TFA
20"
ShClystCly
5
Customer:
Well:
Avg
MWD Summary Depth
8373' to 10800'
Rig:
Total Charges:
Eni Petroleum
Chlorides
Xceed 900, TeleScope 825, ARC 825
SP05-FN7
Spy Island
24 hr Max
North Slope
Doyon 15
AK-AM-0900072075Job No.:
11
25-Dec-2012
24:00Time:
Report #:
Date:
8373'
10800'
2427'
Ss
95
3925'
Cht Lithology (%)
13 3/8"
(current)
68.03912'
Casing
Summary
Lst
YP
1
9.35
(lb/100ft2)
160' 3925' 3765'
LSND
Hycalog SKHI716D-E4C PDC
Condition
40.0
Coal Gvl
API FL
4.9
1-1-WT-A-E-1-NO-TD
Cor Solids
6.0
pH
10.84
ml/30min
RPM
ECD
(ppg)
Avg
1,300
Depth in / out
Tools Min Max
12.25" 0.969
* 10000 units = 100% Gas In Air
Logging Engineers:Leigh Ann Rasher / Kori Jo Plowman
Connection
0
0
C-3
0
0
0
-
C-5n
(current)
Report By:
907-685-0772Unit Phone:Leigh Ann Rasher
2148
2
(max)
Chromatograph (ppm)
0
0
C-1
0
Minimum
C-4iC-2
52744
C-5iC-4n
0030
15
20
md
10632'
9213'
Average
0
Gas Summary
0
00000
Units*Depth
Maximum
-
24 hr Recap:
8 Trip
Drill ahead from 8373' MD to 10800' MD. Max gas observed was 415 units at 9213' MD.
(max)
415
Background
.
.
Density (ppg) Viscosity
out (sec/qt)
Min Max
12.25" 0.969
10.87
ml/30min
RPM
ECD
(ppg)
Avg
1,300
Depth in / out
Tools
Coal Gvl
API FL
5.0
1-1-WT-A-E-1-NO-TD
Cor Solids
6.3
pH
Condition
40.0
YP
1
9.50
(lb/100ft2)
160' 3925' 3765'
LSND
Hycalog SKHI716D-E4C PDC
(current)
68.03912'
Casing
Summary
Lst
40
3925'
Cht Lithology (%)
13 3/8"
Ss
Job No.:
12
26-Dec-2012
24:00Time:
Report #:
Date:
10800'
12004'
1204'
Total Charges:
Eni Petroleum
Chlorides
Xceed 900, TeleScope 825, ARC 825
SP05-FN7
Spy Island
24 hr Max
North Slope
Doyon 15
AK-AM-0900072075
Customer:
Well:
Avg
MWD Summary Depth
10800' to 12004'
Rig:
ShClystCly
1050
25.70
WOB
2
23
160'
49
EVAMAR
Weight
TFA
20"
Make
10.67
mg/l
10.45
Rig Activity:
446.4
$3,410.00
10801'
Current Pump & Flow Data:
Current Depth:
24 Hour Progress:
$42,120.00 Ross/Amend/BuchananReport For:
Depth Mud Type
Yesterday's Depth:
909 SPP (psi)
9.70
(ppb Eq)
215 Gallons/stroke
Max @ ft
PV
16.5
16"
BROOH
2317
Size
Daily Charges:
227.9 Flow In (gpm)
Flow In (spm)
Hours
1.117
13
Smith XR+ Milltooth
Mud Data
@
%
MBT
ROP (ft/hr)
Bit Type
Silt Siltst
12004'
96%
BTC
4.23
Tuff
Footage
30.0
Grade
Area:
Location:
L-80
ROP
Set AtSize
178.9 X-65
Bit #
Current
in cP
* 10000 units = 100% Gas In Air
1354
Background 59
24 hr Recap:
-Trip
Drill ahead from 10800' MD to Intermediate TD of 12004' MD/3996' TVD. BROOH to 10618' MD, monitor well, static.
(max)
Maximum
DepthUnits*
006104
00
Gas Summary
185
md
11844'
11081'
Average
563
0023
121482
C-5iC-4nC-1
57
Minimum
C-4iC-2
(max)
Chromatograph (ppm)
0
23
Leigh Ann Rasher
14930
3
Report By:
Cont to BROOH to 9292' MD. Max gas observed was 1354 units @ 11081' MD.
907-685-0772Unit Phone:
C-3
0
0
30
-
C-5n
(current)
Logging Engineers:Leigh Ann Rasher / Kori Jo Plowman
Connection
0
16
.
.
Density (ppg) Viscosity
out (sec/qt)
ROP
Set AtSize
178.9 X-65
Bit #
Current
in cP
Area:
Location:
L-80
30.0
Grade
4.23
Tuff
Footage
96%
BTC
ROP (ft/hr)
Bit Type
Silt Siltst
12004'
@
%
MBT
Flow In (spm)
Hours
1.117
13
Smith XR+ Milltooth
Mud Data PV
18.0
16"
BROOH
1281
Size
Daily Charges:
Flow In (gpm)
Depth Mud Type
Yesterday's Depth:
910 SPP (psi)
9.90
(ppb Eq)
215 Gallons/stroke
Max @ ft Current Pump & Flow Data:
Current Depth:
24 Hour Progress:
$45,530.00 Ross/Wimmer/BuchananReport For:
Make
mg/l
Rig Activity:$3,410.00
25.70
WOB
2
26
160'
48
EVAMAR
Weight
TFA
20"
ShClystCly
Customer:
Well:
Avg
MWD Summary Depth
12004' to 12004'
Rig:
Total Charges:
Eni Petroleum
Chlorides
Xceed 900, TeleScope 825, ARC 825
SP05-FN7
Spy Island
24 hr Max
North Slope
Doyon 15
AK-AM-0900072075Job No.:
13
27-Dec-2012
24:00Time:
Report #:
Date:
12004'
12004'
0'
Ss
3925'
Cht Lithology (%)
13 3/8"
(current)
68.03912'
Casing
Summary
Lst
YP
1
9.50
(lb/100ft2)
160' 3925' 3765'
LSND
Hycalog SKHI716D-E4C PDC
Condition
40.0
Coal Gvl
API FL
5.6
1-1-WT-A-E-1-NO-TD
Cor Solids
6.7
pH
ml/30min
RPM
ECD
(ppg)
Avg
1,100
Depth in / out
Tools Min Max
12.25" 0.969
* 10000 units = 100% Gas In Air
Logging Engineers:Leigh Ann Rasher / Kori Jo Plowman
Connection
0
0
C-3
0
0
0
-
C-5n
(current)
Report By:
907-685-0772Unit Phone:Leigh Ann Rasher
0
(max)
Chromatograph (ppm)
0
0
C-1
0
Minimum
C-4iC-2
0
C-5iC-4n
000
0
md
Average
0
Gas Summary
0
00000
Units*Depth
Maximum
25
24 hr Recap:
-Trip
Cont BROOH per K&M.
(max)
Background
.
.
Density (ppg) Viscosity
out (sec/qt)
Min Max
12.25" 0.969 39.20
ml/30min
RPM
12004'
ECD
(ppg)
Avg
1,000
Depth in / out
Tools
2-1-BT-N-X-I-ER-TR
Coal Gvl
API FL
5.8
1-1-WT-A-E-1-NO-TD
Cor Solids
6.7
180
pH
Condition
40.0
YP
1
9.45
(lb/100ft2)
160' 3925' 3765'
LSND
Hycalog SKHI716D-E4C PDC
(current)
68.03912'
Casing
Summary
Lst
3925'
Cht Lithology (%)
13 3/8"
8079'
Ss
Job No.:
14
28-Dec-2012
24:00Time:
Report #:
Date:
12004'
12004'
0'
Total Charges:
Eni Petroleum
Chlorides
TeleScope 825, ARC 825, SADN 825
SP05-FN7
Spy Island
24 hr Max
North Slope
Doyon 15
AK-AM-0900072075
Customer:
Well:
Avg
MWD Summary Depth
12004' to 12004'
Rig:
ShClystCly
25.70
WOB
2
21
160'
47
EVAMAR
Weight
TFA
20"
Make
10
mg/l
Rig Activity:$3,410.00
Current Pump & Flow Data:
Current Depth:
24 Hour Progress:
$48,940.00 Ross/Wimmer/BuchananReport For:
Depth Mud Type
Yesterday's Depth:
903 SPP (psi)
9.70
(ppb Eq)
214 Gallons/stroke
Max @ ft
PV
17.5
16"
Circulate
2603
Size
Daily Charges:
Flow In (gpm)
Flow In (spm)
Hours
1.117
12
Smith XR+ Milltooth
Mud Data
@
%
MBT
ROP (ft/hr)
Bit Type
Silt Siltst
12004'
96%
BTC
4.23
Tuff
Footage
30.0
Grade
Area:
Location:
L-80
ROP
Set AtSize
178.9 X-65
Bit #
Current
in cP
* 10000 units = 100% Gas In Air
Background 75
24 hr Recap:
-Trip
Cont to BROOH to 1150' MD. Circ hole clean. POH, make up BHA #4 and RIH to 12000' MD. CBU x2.
(max)
Maximum
DepthUnits*
00000
00
Gas Summary
md
Average
0
000
0
C-5iC-4nC-1
0
Minimum
C-4iC-2
(max)
Chromatograph (ppm)
0
0
Leigh Ann Rasher
0
Report By:
907-685-0772Unit Phone:
C-3
0
0
0
-
C-5n
(current)
Logging Engineers:Leigh Ann Rasher / Kori Jo Plowman
Connection
0
0
.
.
Density (ppg) Viscosity
out (sec/qt)
ROP
Set AtSize
178.9 X-65
Bit #
Current
in cP
Area:
Location:
L-80
30.0
Grade
4.23
Tuff
HYDRIL
Footage
96%
BTC
ROP (ft/hr)
Bit Type
Silt Siltst
12004'
@
%
MBT
Flow In (spm)
Hours
1.117
13
Smith XR+ Milltooth
Mud Data PV
17.5
16"
Change Rams
Size
Daily Charges:
Flow In (gpm)
Depth Mud Type
Yesterday's Depth:
SPP (psi)
9.70
(ppb Eq)
Gallons/stroke
Max @ ft Current Pump & Flow Data:
Current Depth:
24 Hour Progress:
$52,350.00 Ross/Wimmer/BuchananReport For:
Make
10
mg/l
Rig Activity:$3,410.00
25.70
WOB
2
18
160'
51
EVAMAR
Weight
TFA
20"
ShClystCly
Customer:
Well:
Avg
MWD Summary Depth
12004' to 12004'
Rig:
Total Charges:
Eni Petroleum
Chlorides
SP05-FN7
Spy Island
24 hr Max
North Slope
Doyon 15
AK-AM-0900072075Job No.:
15
29-Dec-2012
24:00Time:
Report #:
Date:
12004'
12004'
0'
9 5/8"
Ss
3925'
40.0
Cht Lithology (%)
13 3/8"
8079'
(current)
68.03912'
Casing
Summary
Lst
YP
1
9.50
(lb/100ft2)
L-80
160' 3925' 3765'
LSND
Hycalog SKHI716D-E4C PDC
Condition
40.0
Coal Gvl
API FL
5.8
1-1-WT-A-E-1-NO-TD
Cor Solids
6.6
180
pH
ml/30min
RPM
12004'
ECD
(ppg)
Avg
1,000
Depth in / out
Tools
2-1-BT-N-X-I-ER-TR
Min Max
12.25" 0.969 39.20
* 10000 units = 100% Gas In Air
Logging Engineers:Leigh Ann Rasher / Kori Jo Plowman
Connection
0
0
C-3
0
0
0
-
C-5n
(current)
Report By:
on elevators to 3895' MD. Cut drill line, service rig. Cont POOH to 255' MD, monitor well, static. L/D BHA #4. Drain stack, pull wear
907-685-0772Unit Phone:Leigh Ann Rasher
0
(max)
Chromatograph (ppm)
0
0
C-1
0
Minimum
C-4iC-2
0
C-5iC-4n
000
0
md
Average
0
Gas Summary
0
00000
Units*Depth
Maximum
131
24 hr Recap:
-Trip
Cont. to CBU x2 per K&M. POOH on elevators to 11315' MD. Perform MAD pass f/ 11315' MD to 10925' MD. Cont POOH
(max)
bushing, set test plug, change out rams.
Background
.
.
Density (ppg) Viscosity
out (sec/qt)
Min Max
12.25" 0.969 39.20
ml/30min
RPM
12004'
ECD
(ppg)
Avg
1,000
Depth in / out
Tools
2-1-BT-N-X-I-ER-TR
Coal Gvl
API FL
6.0
1-1-WT-A-E-1-NO-TD
Cor Solids
6.6
180
pH
Condition
40.0
YP
1
9.55
(lb/100ft2)
L-80
160' 3925' 3765'
LSND
Hycalog SKHI716D-E4C PDC
(current)
68.03912'
Casing
Summary
Lst
3925'
40.0
Cht Lithology (%)
13 3/8"
8079'
9 5/8"
Ss
Job No.:
16
30-Dec-2012
24:00Time:
Report #:
Date:
12004'
12004'
0'
Total Charges:
Eni Petroleum
Chlorides
SP05-FN7
Spy Island
24 hr Max
North Slope
Doyon 15
AK-AM-0900072075
Customer:
Well:
Avg
MWD Summary Depth
12004' to 12004'
Rig:
ShClystCly
25.70
WOB
2
24
160'
55
EVAMAR
Weight
TFA
20"
Make
10
mg/l
Rig Activity:$3,410.00
Current Pump & Flow Data:
Current Depth:
24 Hour Progress:
$55,760.00 Ross/Wimmer/BuchananReport For:
Depth Mud Type
Yesterday's Depth:
SPP (psi)
9.70
(ppb Eq)
Gallons/stroke
Max @ ft
PV
17.5
16"
Float 9 5/8" casing
Size
Daily Charges:
Flow In (gpm)
Flow In (spm)
Hours
1.117
13
Smith XR+ Milltooth
Mud Data
@
%
MBT
ROP (ft/hr)
Bit Type
Silt Siltst
12004'
96%
BTC
4.23
Tuff
HYDRIL
Footage
30.0
Grade
Area:
Location:
L-80
ROP
Set AtSize
178.9 X-65
Bit #
Current
in cP
* 10000 units = 100% Gas In Air
Background 10
24 hr Recap:
-Trip
Cont change variable rams. R/U and float 9 5/8" casing per well plan.
(max)
Maximum
DepthUnits*
00000
00
Gas Summary
md
Average
0
000
0
C-5iC-4nC-1
0
Minimum
C-4iC-2
(max)
Chromatograph (ppm)
0
0
Leigh Ann Rasher
0
Report By:
907-685-0772Unit Phone:
C-3
0
0
0
-
C-5n
(current)
Logging Engineers:Leigh Ann Rasher / Kori Jo Plowman
Connection
0
0
.
.
Density (ppg) Viscosity
out (sec/qt)
ROP
Set AtSize
178.9 X-65
Bit #
Current
in cP
Area:
Location:
L-80
30.0
Grade
4.23
Tuff
HYDRIL
Footage
96%
BTC
ROP (ft/hr)
Bit Type
Silt Siltst
12004'
@
%
MBT
Flow In (spm)
Hours
1.117
14
Smith XR+ Milltooth
Mud Data PV
16"
Prep N/D BOP
Size
Daily Charges:
Flow In (gpm)
Depth Mud Type
Yesterday's Depth:
SPP (psi)
9.50
(ppb Eq)
Gallons/stroke
Max @ ft Current Pump & Flow Data:
Current Depth:
24 Hour Progress:
$59,170.00 Ross/Wimmer/BuchananReport For:
Make
10
mg/l
Rig Activity:$3,410.00
25.70
WOB
2
16
160'
49
EVAMAR
Weight
TFA
20"
ShClystCly
Customer:
Well:
Avg
MWD Summary Depth
12004' to 12004'
Rig:
Total Charges:
Eni Petroleum
Chlorides
SP05-FN7
Spy Island
24 hr Max
North Slope
Doyon 15
AK-AM-0900072075Job No.:
17
31-Dec-2012
24:00Time:
Report #:
Date:
12004'
12004'
0'
9 5/8"
Ss
3925'
40.0
Cht Lithology (%)
11989'
13 3/8"
8079'
(current)
68.03912'
Casing
Summary
Lst
YP
1
9.50
(lb/100ft2)
L-80
160' 3925' 3765'
LSND
Hycalog SKHI716D-E4C PDC
Condition
40.0
Coal Gvl
API FL
1-1-WT-A-E-1-NO-TD
Cor Solids
180
pH
ml/30min
RPM
12004'
ECD
(ppg)
Avg
Depth in / out
Tools
2-1-BT-N-X-I-ER-TR
Min Max
12.25" 0.969 39.20
* 10000 units = 100% Gas In Air
Logging Engineers:Leigh Ann Rasher / Kori Jo Plowman
Connection
0
0
C-3
0
0
0
-
C-5n
(current)
Report By:
equip, prep to N/D BOP. Max gas was 60 units during circulation.
907-685-0772Unit Phone:Leigh Ann Rasher
0
(max)
Chromatograph (ppm)
0
0
C-1
0
Minimum
C-4iC-2
0
C-5iC-4n
000
0
md
Average
0
Gas Summary
0
00000
Units*Depth
Maximum
-
24 hr Recap:
-Trip
Cont to float 9 5/8" casing to 11989' MD. R/U cement head & lines. Condition mud for cement job. Cement, R/D cement
(max)
Background
.
.
Density (ppg) Viscosity
out (sec/qt)
Min Max
12.25" 0.969 39.20
ml/30min
RPM
12004'
ECD
(ppg)
Avg
Depth in / out
Tools
2-1-BT-N-X-I-ER-TR
Coal Gvl
API FL
1-1-WT-A-E-1-NO-TD
Cor Solids
180
pH
Condition
40.0
YP
1
9.45
(lb/100ft2)
L-80
160' 3925' 3765'
LSND
Hycalog SKHI716D-E4C PDC
(current)
68.03912'
Casing
Summary
Lst
3925'
40.0
Cht Lithology (%)
11989'
13 3/8"
8079'
9 5/8"
Ss
Job No.:
18
1-Jan-2013
24:00Time:
Report #:
Date:
12004'
12004'
0'
Total Charges:
Eni Petroleum
Chlorides
SP05-FN7
Spy Island
24 hr Max
North Slope
Doyon 15
AK-AM-0900072075
Customer:
Well:
Avg
MWD Summary Depth
12004' to 12004'
Rig:
ShClystCly
25.70
WOB
2
16
160'
47
EVAMAR
Weight
TFA
20"
Make
10
mg/l
Rig Activity:$3,410.00
Current Pump & Flow Data:
Current Depth:
24 Hour Progress:
$62,580.00 Ross/Wimmer/BuchananReport For:
Depth Mud Type
Yesterday's Depth:
SPP (psi)
9.50
(ppb Eq)
Gallons/stroke
Max @ ft
PV
16"
R/U Test BOPE's
Size
Daily Charges:
Flow In (gpm)
Flow In (spm)
Hours
1.117
14
Smith XR+ Milltooth
Mud Data
@
%
MBT
ROP (ft/hr)
Bit Type
Silt Siltst
12004'
96%
BTC
4.23
Tuff
HYDRIL
Footage
30.0
Grade
Area:
Location:
L-80
ROP
Set AtSize
178.9 X-65
Bit #
Current
in cP
* 10000 units = 100% Gas In Air
Background -
24 hr Recap:
-Trip
N/D BOPE. Set 9 5/8" emergency slips. Install packoff & test, OK. C/O handling equip for 4.5" DP & C/O rams to
(max)
Maximum
DepthUnits*
00000
00
Gas Summary
md
Average
0
000
0
C-5iC-4nC-1
0
Minimum
C-4iC-2
(max)
Chromatograph (ppm)
0
0
Leigh Ann Rasher
0
Report By:
variables. Freeze protect OA. P/U 4.5" DP. Set test plug and R/U to test BOPE.
907-685-0772Unit Phone:
C-3
0
0
0
-
C-5n
(current)
Logging Engineers:Leigh Ann Rasher / Kori Jo Plowman
Connection
0
0
.
.
Density (ppg) Viscosity
out (sec/qt)
12004' 8079' 10 180 2-1-BT-N-X-I-ER-TR2Hycalog SKHI716D-E4C PDC 12.25" 0.969 39.20 3925'
ROP
Set AtSize
178.9 X-65
Bit #
Current
in cP
Area:
Location:
L-80
30.0
Grade
4.23
Tuff
HYDRIL
Footage
96%
BTC
ROP (ft/hr)
Bit Type
Silt Siltst
11989'
@
%
MBT
Flow In (spm)
Hours
1.117
14
Smith XR+ Milltooth
Mud Data PV
16"
RIH BHA #5
Size
Daily Charges:
Flow In (gpm)
Depth Mud Type
Yesterday's Depth:
SPP (psi)
(ppb Eq)
Gallons/stroke
Max @ ft Current Pump & Flow Data:
Current Depth:
24 Hour Progress:
$65,990.00 Ross/Wimmer/BuchananReport For:
Make
mg/l
Rig Activity:$3,410.00
25.70
WOB
3
17
160'
63
EVAMAR
Weight
TFA
20"
ShClystCly
Customer:
Well:
Avg
MWD Summary Depth
12004' to 12004'
Rig:
Total Charges:
Eni Petroleum
Chlorides
SP05-FN7
Spy Island
24 hr Max
North Slope
Doyon 15
AK-AM-0900072075Job No.:
19
2-Jan-2013
24:00Time:
Report #:
Date:
12004'
12004'
0'
9 5/8"
Ss
12004'
40.0
Cht Lithology (%)
11989'
13 3/8"
(current)
68.03912'
Casing
Summary
Lst
YP
1
9.45
(lb/100ft2)
L-80
160' 3925' 3765'
LSND
Hycalog SKH616M-E1D PDC
Condition
40.0
Coal Gvl
API FL
1-1-WT-A-E-1-NO-TD
Cor SolidspH
ml/30min
RPM
ECD
(ppg)
Avg
Depth in / out
Tools Min Max
8.75" 0.902
* 10000 units = 100% Gas In Air
Logging Engineers:Leigh Ann Rasher / Kori Jo Plowman
Connection
0
0
C-3
0
0
0
-
C-5n
Report By:
907-685-0772Unit Phone:Leigh Ann Rasher
0
Chromatograph (ppm)
0
0
C-1
0
Minimum
C-4iC-2
0
C-5iC-4n
000
0
md
Average
0
Gas Summary
0
00000
Units*Depth
()
Maximum
-
24 hr Recap:
-Trip
Cont test BOPE. P/U BHA #5. RIH w/ 4.5" DP to 9761' MD. Cont RIH w/ 5" DP.
Background
.
.
Density (ppg) Viscosity
out (sec/qt)
12004' 8079' 10 180 2-1-BT-N-X-I-ER-TR2Hycalog SKHI716D-E4c PDC 12.25" 0.969 39.20 3925'
20"
13 3/8"
9 5/8"
BTC
L-80
Grade
L-80
40.0
ROP
Set AtSize
178.9 X-65
Bit #
Area:
Location:
96%
550
135
SPP (psi)
Gallons/stroke
3166
@
Yesterday's Depth:
289.6
Rig:
Job No.:
ROP (ft/hr)
Condition
in
Mud Data
Depth in / out
%
Casing
Summary
RPM HoursBit Type TFA
Cly
Current Pump & Flow Data: Max @ ft Current
12281'192.7
4.23 Flow In (spm)
MWD Summary
Total Charges:
12004'
12400'
396'
Current Depth:
24 Hour Progress:
Drill 8.75" holeRig Activity:
Doyon 15
Daily Charges:$3,410.00
5.6
Alkal Lime
$69,400.00 Report For:
Ratio cP
Keener/Wimmer/Buchanan
Flow In (gpm)
TuffGvlCoal
68.0
Weight
Size
Smith XR+ Milltooth
160'
3912'
11989'
Lithology (%)
(current)
ShClyst
8.75 0.902
Footage
ENI Petroleum
SP05-FN7
Spy Island
24 hr Max
North Slope
331.7
Customer:
Well:
Avg
1.117
1652
16" 3765'
PVOil / Water
160' 3925'
WOB
20
3-Jan-2013
24:00:00Time:
Report #:
Date:
AK-AM-0900072075
5
25.70
2.0 16
Ss
NA
Lst
12004'
EVAMAR
Make
9.40
40.01
3 Hycalog SKH616M-E1D PDC
15
Cht Silt Siltst
80
HYDRIL
YP
1-1-WT-A-E-1-NO-TD
Cor Solids
(lb/100ft2)
3.382.60
Mud (lb/bbl)ml/30min
12254' FazePro
Depth Mud Type
Depth
12400'to12004' 11.0810.5910.85
Avg Min MaxECD (ppg)Tools
Xceed 675, PeriScope 675, TeleScope 675, adnVISION 675
API FL
30.0
* 10000 units = 100% Gas In Air
Logging Engineers:Leigh Ann Rasher/Kori Jo Plowman
C-5i
907-685-0772Unit Phone:
22
Leigh Ann RasherReport By:
C-1
42Maximum107
0
Depth C-2 C-3
41Minimum
Average 166052563
96
0012103'
1069
Units*
16
12175'
FazePro mud. Slip & cut drill line, inspect brakes, service crown, drawworks, travelling equip. Clean out shoe track & rat hole. Drill
Wash & ream w/ 5" DP. Circ & cond mud, prep for csg test. Perform csg test, 3000 psi for 30 min. Displace to 9.4
512
md
new hole f/ 12004' MD to 12030" MD. CBU, R/U & perform FIT to 12.9 ppg EMW. Drill ahead to 12400' MD. Max gas observed was
1069 units.
122180 448
Gas Summary
C-5n
00
(current)
C-4i C-4n
236 105 32
0
75
5
174
1580
Trip -
24 hr Recap:
64Background -Connection
Chromatograph (ppm)
.
.
Density (ppg) Viscosity
out (sec/qt)
12004' 8079' 10 180 2-1-BT-N-X-I-ER-TR 2 Hycalog SKHI716D-E4c PDC 12.25" 0.969 39.20 3925'
20"
13 3/8"
9 5/8"
BTC
L-80
Grade
L-80
40.0
ROP
Set At Size
178.9 X-65
Bit #
Area:
Location:
96%
508
121
SPP (psi)
Gallons/stroke
2784
@
Yesterday's Depth:
1.9
Rig:
Job No.:
ROP (ft/hr)
Condition
in
Mud Data
Depth in / out
%
Casing
Summary
RPM Hours Bit Type TFA
Cly
Current Pump & Flow Data: Max @ ft Current
13306'219.0
4.23 Flow In (spm)
MWD Summary
Total Charges:
12400'
13584'
1184'
Current Depth:
24 Hour Progress:
Drill 8.75" hole Rig Activity:
Doyon 15
Daily Charges: $3,410.00
7.5
Alkal Lime
$72,810.00 Report For:
Ratio cP
Keener/Wimmer/Buchanan
Flow In (gpm)
Tuff Gvl Coal
68.0
Weight
Size
Smith XR+ Milltooth
160'
3912'
11989'
Lithology (%)
(current)
Sh Clyst
8.75 0.902
Footage
ENI Petroleum
SP05-FN7
Spy Island
24 hr Max
North Slope
424.9
Customer:
Well:
Avg
1.117
15 49
16" 3765'
PV Oil / Water
160' 3925'
WOB
21
4-Jan-2013
24:00:00 Time:
Report #:
Date:
AK-AM-0900072075
25.70
66/34 21
Ss
NA
Lst
12004'
EVAMAR
Make
9.40
40.0 1
3 Hycalog SKH616M-E1D PDC
5
Cht Silt Siltst
95
HYDRIL
YP
1-1-WT-A-E-1-NO-TD
Cor Solids
(lb/100ft 2)
3.38 2.60
Mud (lb/bbl) ml/30min
13535' FazePro
Depth Mud Type
Depth
13584'to 12400' 11.23 10.76 11.04
Avg Min Max ECD (ppg)
Tools
Xceed 675, PeriScope 675, TeleScope 675, adnVISION 675
API FL
30.0
*10000 units = 100% Gas In Air
Logging Engineers: Leigh Ann Rasher/Kori Jo Plowman
C-5i
907-685-0772 Unit Phone:
74
Leigh Ann Rasher Report By:
C-1
129 Maximum 288
0
Depth C-2 C-3
19 Minimum
Average 32 45139 96
229
0013561'
1169
Units*
6
13335'
Drill ahead f/ 12400' MD to 13584' MD. Max gas observed was 1169 units at 13335' MD.
412
md.
127826 623
Gas Summary
C-5n
00
(current)
C-4i C-4n
235 145 59
0
120
374
595
Trip -
24 hr Recap:
23 Background -Connection
Chromatograph (ppm)
.
.
Density (ppg) Viscosity
out (sec/qt)
12004' 8079' 10 180 2-1-BT-N-X-I-ER-TR2Hycalog SKHI716D-E4c PDC 12.25" 0.969 39.20 3925'
20"
13 3/8"
9 5/8"
BTC
L-80
Grade
L-80
40.0
ROP
Set AtSize
178.9 X-65
Bit #
Area:
Location:
96%
508
120
SPP (psi)
Gallons/stroke
2921
@
Yesterday's Depth:
0.0
Rig:
Job No.:
ROP (ft/hr)
Condition
in
Mud Data
Depth in / out
%
Casing
Summary
RPM HoursBit Type TFA
Cly
Current Pump & Flow Data: Max @ ft Current
14985'264.8
4.23 Flow In (spm)
MWD Summary
Total Charges:
13584'
15385'
1801'
Current Depth:
24 Hour Progress:
Drill 8.75" holeRig Activity:
Doyon 15
Daily Charges:$3,410.00
8.2
Alkal Lime
$76,220.00 Report For:
Ratio cP
Keener/Wimmer/Buchanan
Flow In (gpm)
TuffGvlCoal
68.0
Weight
Size
Smith XR+ Milltooth
160'
3912'
11989'
Lithology (%)
(current)
ShClyst
8.75 0.902
Footage
ENI Petroleum
SP05-FN7
Spy Island
24 hr Max
North Slope
416.3
Customer:
Well:
Avg
1.117
1548
16" 3765'
PVOil / Water
160' 3925'
WOB
22
5-Jan-2013
24:00:00Time:
Report #:
Date:
AK-AM-0900072075
25.70
67/33 19
Ss
NA
Lst
12004'
EVAMAR
Make
9.40
40.01
3 Hycalog SKH616M-E1D PDC
15
Cht Silt Siltst
85
HYDRIL
YP
1-1-WT-A-E-1-NO-TD
Cor Solids
(lb/100ft2)
4.103.15
Mud (lb/bbl)ml/30min
15208' FazePro
Depth Mud Type
Depth
15385'to13584' 11.5310.7811.24
Avg Min MaxECD (ppg)Tools
Xceed 675, PeriScope 675, TeleScope 675, adnVISION 675
API FL
30.0
* 10000 units = 100% Gas In Air
Logging Engineers:Leigh Ann Rasher/Kori Jo Plowman
C-5i
907-685-0772Unit Phone:
97
Leigh Ann RasherReport By:
C-1
165Maximum344
0
Depth C-2 C-3
73Minimum
Average 63155426154
273
0015279'
4943
Units*
9
14835'
Drill ahead f/ 13584' MD to 15385' MD. Max gas observed was 4943 units at 14835' MD.
1444
md
314266 836
Gas Summary
C-5n
00
(current)
C-4i C-4n
366 226 106
0
202
448
1585
Trip -
24 hr Recap:
92Background -Connection
Chromatograph (ppm)
.
.
Density (ppg) Viscosity
out (sec/qt)
ECD (ppg)Tools
Xceed 675, PeriScope 675, TeleScope 675, adnVISION 675
API FL
30.0
Depth
16523'to15385' 11.6611.0911.40
Avg Min Max
16482' FazePro
Depth Mud Type
YP
1-1-WT-A-E-1-NO-TD
Cor Solids
(lb/100ft2)
3.322.55
Mud (lb/bbl)ml/30min
1
3 Hycalog SKH616M-E1D PDC
20
Cht Silt Siltst
80
HYDRIL
Ss
NA
Lst
12004'
EVAMAR
Make
9.40
40.025.70
67/33 21
160' 3925'
WOB
23
6-Jan-2013
24:00:00Time:
Report #:
Date:
AK-AM-0900072075
Customer:
Well:
Avg
1.117
1448
16" 3765'
PVOil / Water
8.75 0.902
Footage
ENI Petroleum
SP05-FN7
Spy Island
24 hr Max
North Slope
443.8
Lithology (%)
(current)
ShClyst
68.0
Weight
Size
Smith XR+ Milltooth
160'
3912'
11989'
TuffGvlCoal
$3,410.00
9.2
Alkal Lime
$79,630.00 Report For:
Ratio cP
Keener/Wimmer/Buchanan
Flow In (gpm)
Total Charges:
15385'
16523'
1138'
Current Depth:
24 Hour Progress:
Drill 8.75" holeRig Activity:
Doyon 15
Daily Charges:
Current Pump & Flow Data: Max @ ft Current
15639'219.9
4.23 Flow In (spm)
MWD Summary
Bit Type TFA
Cly
RPM Hours Depth in / out
%
Casing
Summary
Condition
in
Mud Data
@
Yesterday's Depth:
46.4
Rig:
Job No.:
ROP (ft/hr)
Area:
Location:
96%
520
123
SPP (psi)
Gallons/stroke
3120
ROP
Set AtSize
178.9 X-65
Bit #
L-80
Grade
L-80
40.0
3925'
20"
13 3/8"
9 5/8"
BTC
12004' 8079' 10 180 2-1-BT-N-X-I-ER-TR2Hycalog SKHI716D-E4c PDC 12.25" 0.969 39.20
* 10000 units = 100% Gas In Air
-Connection
Chromatograph (ppm)
-
24 hr Recap:
23Background Trip
2080
283
366 226 106
0
202
C-4i C-4n
(current)
C-5n
00
106294 474
Gas Summary
md
Max gas observed is 973 units at 15610' MD.
Drill ahead f/ 15385' MD to 16665' MD. Decide to open hole sidetrack. BROOH to 16476' MD. Kick off from 16485' MD.
349
Units*
8
15610'973
15458'
154
190
00Minimum
Average 63155426
237
0
Depth C-2 C-3
24
Report By:
C-1
124Maximum
C-5i
907-685-0772Unit Phone:
74
Leigh Ann RasherLogging Engineers:Leigh Ann Rasher/Kori Jo Plowman
.
.
Density (ppg) Viscosity
out (sec/qt)
12004' 8079' 10 180 2-1-BT-N-X-I-ER-TR2Hycalog SKHI716D-E4c PDC 12.25" 0.969 39.20 3925'
20"
13 3/8"
9 5/8"
BTC
L-80
Grade
L-80
40.0
ROP
Set AtSize
178.9 X-65
Bit #
Area:
Location:
96%
508
120
SPP (psi)
Gallons/stroke
3115
@
Yesterday's Depth:
5.0
Rig:
Job No.:
ROP (ft/hr)
Condition
in
Mud Data
Depth in / out
%
Casing
Summary
RPM HoursBit Type TFA
Cly
Current Pump & Flow Data: Max @ ft Current
17344'241.3
4.23 Flow In (spm)
MWD Summary
Total Charges:
16523'
17778'
1255'
Current Depth:
24 Hour Progress:
Drill 8.75" holeRig Activity:
Doyon 15
Daily Charges:$3,410.00
9.2
Alkal Lime
$83,040.00 Report For:
Ratio cP
Keener/Wimmer/Buchanan
Flow In (gpm)
TuffGvlCoal
68.0
Weight
Size
Smith XR+ Milltooth
160'
3912'
11989'
Lithology (%)
(current)
ShClyst
8.75 0.902
Footage
ENI Petroleum
SP05-FN7
Spy Island
24 hr Max
North Slope
572.8
Customer:
Well:
Avg
1.117
1345
16" 3765'
PVOil / Water
160' 3925'
WOB
24
7-Jan-2013
24:00:00Time:
Report #:
Date:
AK-AM-0900072075
9.40
25.70
68/32 16
Ss
NA
Lst
12004'
EVAMAR
Make
9.40
40.01
3 Hycalog SKH616M-E1D PDC
5
Cht Silt Siltst
95
HYDRIL
YP
1-1-WT-A-E-1-NO-TD
Cor Solids
(lb/100ft2)
3.252.50
Mud (lb/bbl)ml/30min
17592' FazePro
Depth Mud Type
Depth
17778'to16523' 11.5811.0811.35
Avg Min MaxECD (ppg)Tools
Xceed 675, PeriScope 675, TeleScope 675, adnVISION 675
API FL
30.0
* 10000 units = 100% Gas In Air
Logging Engineers:Leigh Ann Rasher/Kori Jo Plowman
C-5i
907-685-0772Unit Phone:
76
Leigh Ann RasherReport By:
C-1
131Maximum265
0
Depth C-2 C-3
48Minimum
Average 4853551121
217
0017165'
932
Units*
14
16811'
Drill ahead f/ 16523' MD to 17778' MD. Max gas observed was 932 units at 16811' MD.
480
md
121859 518
Gas Summary
C-5n
00
(current)
C-4i C-4n
243 160 81
1
154
317
595
Trip -
24 hr Recap:
51Background -Connection
Chromatograph (ppm)
.
.
Density (ppg) Viscosity
out (sec/qt)
ECD (ppg)Tools
Xceed 675, PeriScope 675, TeleScope 675, adnVISION 675
API FL
30.0
Depth
19860'to17778' 11.9711.2511.62
Avg Min Max
19564' FazePro
Depth Mud Type
YP
1-1-WT-A-E-1-NO-TD
Cor Solids
(lb/100ft2)
3.252.50
Mud (lb/bbl)ml/30min
1
3 Hycalog SKH616M-E1D PDC
45
Cht Silt Siltst
55
HYDRIL
Ss
NA
Lst
12004'
EVAMAR
Make
9.40
40.025.70
70/30 19
160' 3925'
WOB
25
8-Jan-2013
24:00:00Time:
Report #:
Date:
AK-AM-0900072075
Customer:
Well:
Avg
1.117
1346
16" 3765'
PVOil / Water
8.75 0.902
Footage
ENI Petroleum
SP05-FN7
Spy Island
24 hr Max
North Slope
448.9
Lithology (%)
(current)
ShClyst
68.0
Weight
Size
Smith XR+ Milltooth
160'
3912'
11989'
TuffGvlCoal
$3,410.00
9.6
Alkal Lime
$86,450.00 Report For:
Ratio cP
Keener/Wimmer/Buchanan
Flow In (gpm)
Total Charges:
17778'
19860'
2082'
Current Depth:
24 Hour Progress:
Drill 8.75" holeRig Activity:
Doyon 15
Daily Charges:
Current Pump & Flow Data: Max @ ft Current
18561'270.2
4.23 Flow In (spm)
MWD Summary
Bit Type TFA
Cly
RPM Hours Depth in / out
%
Casing
Summary
Condition
in
Mud Data
@
Yesterday's Depth:
213.5
Rig:
Job No.:
ROP (ft/hr)
Area:
Location:
96%
512
120
SPP (psi)
Gallons/stroke
3478
ROP
Set AtSize
178.9 X-65
Bit #
L-80
Grade
L-80
40.0
3925'
20"
13 3/8"
9 5/8"
BTC
12004' 8079' 10 180 2-1-BT-N-X-I-ER-TR2Hycalog SKHI716D-E4c PDC 12.25" 0.969 39.20
* 10000 units = 100% Gas In Air
-Connection
Chromatograph (ppm)
-
24 hr Recap:
78Background Trip
4555
291
0 0 0
117
2
C-4i C-4n
(current)
C-5n
4267
128607 451
Gas Summary
md
Drill ahead f/ 17778' MD to 19860' MD. Max gas observed was 1228 units at 19186' MD.
321
Units*
11
19186'1228
19575'
0
205
87110Minimum
Average 049
250
148
Depth C-2 C-3
38751
Report By:
C-1
123Maximum
C-5i
907-685-0772Unit Phone:
68
Leigh Ann RasherLogging Engineers:Leigh Ann Rasher/Paris Ervin
.
.
Density (ppg) Viscosity
out (sec/qt)
12004' 8079' 10 180 2-1-BT-N-X-I-ER-TR2Hycalog SKHI716D-E4c PDC 12.25" 0.969 39.20 3925'
20"
13 3/8"
9 5/8"
BTC
L-80
Grade
L-80
40.0
ROP
Set AtSize
178.9 X-65
Bit #
Area:
Location:
96%
512
120
SPP (psi)
Gallons/stroke
3478
@
Yesterday's Depth:
Rig:
Job No.:
ROP (ft/hr)
Condition
in
Mud Data
Depth in / out
%
Casing
Summary
RPM HoursBit Type TFA
Cly
Current Pump & Flow Data: Max @ ft Current
21189'229.3
4.23 Flow In (spm)
MWD Summary
Total Charges:
19860'
21230'
1370'
Current Depth:
24 Hour Progress:
BROOHRig Activity:
Doyon 15
Daily Charges:$4,410.00
9.7
Alkal Lime
$90,860.00 Report For:
Ratio cP
Wimmer/Amend/Buchanan
Flow In (gpm)
TuffGvlCoal
68.0
Weight
Size
Smith XR+ Milltooth
160'
3912'
11989'
Lithology (%)
(current)
ShClyst
8.75 0.902
Footage
ENI Petroleum
SP05-FN7
Spy Island
24 hr Max
North Slope
631.1
Customer:
Well:
Avg
1.117
1646
16" 3765'
PVOil / Water
160' 3925'
WOB
26
9-Jan-2013
24:00:00Time:
Report #:
Date:
AK-AM-0900072075
25.70
69/31 17
Ss
NA
Lst
12004' 21230'
EVAMAR
Make
9.40
40.01
3 Hycalog SKH616M-E1D PDC
80
Cht Silt Siltst
20
HYDRIL
YP
1-1-WT-A-E-1-NO-TD
Cor Solids
(lb/100ft2)
3.382.60
Mud (lb/bbl)ml/30min
21146' FazePro
Depth Mud Type
Depth
21230'to19860' 12.3211.5011.90
Avg Min MaxECD (ppg)Tools
Xceed 675, PeriScope 675, TeleScope 675, adnVISION 675
API FL
30.0
* 10000 units = 100% Gas In Air
Logging Engineers:Leigh Ann Rasher/Paris Ervin
C-5i
907-685-0772Unit Phone:
79
Leigh Ann RasherReport By:
C-1
130Maximum256
0
Depth C-2 C-3
30Minimum
Average 311475285
201
0020057'
1009
Units*
9
20286'
Drilled ahead f/ 19860' MD to FTD 21230' MD. BROOH. Max gas observed was units at 19186' MD.
291
md
*Please note extra $1000 charge for mudlogger change out on 01/08/2013*
107847 422
Gas Summary
C-5n
00
(current)
C-4i C-4n
117 106 56
0
111
281
8020
Trip -
24 hr Recap:
36Background -Connection
Chromatograph (ppm)
.
.
Density (ppg) Viscosity
out (sec/qt)
ECD (ppg)Tools
Xceed 675, PeriScope 675, TeleScope 675, adnVISION 675
API FL
30.0
Depth
21230'to21230'
Avg Min Max
21230' FazePro
Depth Mud Type
YP
1-1-WT-A-E-1-NO-TD
Cor Solids
(lb/100ft2)
3.252.50
Mud (lb/bbl)ml/30min
1
3 Hycalog SKH616M-E1D PDC
Cht Silt Siltst
HYDRIL
Ss
NA
Lst
12004' 21230'
EVAMAR
Make
9.40
40.025.70
70/30 16
160' 3925'
WOB
27
10-Jan-2013
24:00:00Time:
Report #:
Date:
AK-AM-0900072075
Customer:
Well:
Avg
1.117
1546
16" 3765'
PVOil / Water
8.75 0.902
Footage
ENI Petroleum
SP05-FN7
Spy Island
24 hr Max
North Slope
Lithology (%)
(current)
ShClyst
68.0
Weight
Size
Smith XR+ Milltooth
160'
3912'
11989'
TuffGvlCoal
$3,410.00
8.9
Alkal Lime
$94,270.00 Report For:
Ratio cP
Perry/Wimmer/Amend/Buchanan
Flow In (gpm)
Total Charges:
21230'
21230'
0'
Current Depth:
24 Hour Progress:
BROOHRig Activity:
Doyon 15
Daily Charges:
Current Pump & Flow Data: Max @ ft Current
4.23 Flow In (spm)
MWD Summary
Bit Type TFA
Cly
RPM Hours Depth in / out
%
Casing
Summary
Condition
in
Mud Data
@
Yesterday's Depth:
Rig:
Job No.:
ROP (ft/hr)
Area:
Location:
96%
512
121
SPP (psi)
Gallons/stroke
2650
ROP
Set AtSize
178.9 X-65
Bit #
L-80
Grade
L-80
40.0
3925'
20"
13 3/8"
9 5/8"
BTC
12004' 8079' 10 180 2-1-BT-N-X-I-ER-TR2Hycalog SKHI716D-E4c PDC 12.25" 0.969 39.20
* 10000 units = 100% Gas In Air
-Connection
Chromatograph (ppm)
286
24 hr Recap:
-Background Trip
0
0 0 0
0
0
C-4i C-4n
(current)
C-5n
00
00
Gas Summary
md
BROOH f/ 21230' MD to 12340' MD.
Units*
0
0
00Minimum
Average 00
0
0
Depth C-2 C-3
0
Report By:
C-1
0Maximum
C-5i
907-685-0772Unit Phone:
0
Leigh Ann RasherLogging Engineers:Leigh Ann Rasher/Paris Ervin
.
.
Density (ppg) Viscosity
out (sec/qt)
ECD (ppg)Tools
API FL
10
30.0
Depth
21230'to21230'
Avg Min Max
21230' FazePro
Depth Mud Type
YP
1-1-WT-A-E-1-NO-TD
Cor Solids
(lb/100ft2)
3.512.70
Mud (lb/bbl)ml/30min
1
3 Hycalog SKH616M-E1D PDC
Cht Silt Siltst
HYDRIL
Ss
NA
Lst
12004' 21230'
EVAMAR
Make
9.40
140
40.0
85.90 9226'
25.70
70/30 15
160' 3925'
WOB
28
11-Jan-2013
24:00:00Time:
Report #:
Date:
AK-AM-0900072075
Customer:
Well:
Avg
1.117
1346
16" 3765'
PVOil / Water
8.75 0.902
Footage
ENI Petroleum
SP05-FN7
Spy Island
24 hr Max
North Slope
Lithology (%)
(current)
ShClyst
68.0
Weight
Size
Smith XR+ Milltooth
2-2-CT-A-X-I-BU-TD
160'
3912'
11989'
TuffGvlCoal
$3,410.00
9.0
Alkal Lime
$97,680.00 Report For:
Ratio cP
Keener/Perry/Amend/Buchanan
Flow In (gpm)
Total Charges:
21230'
21230'
0'
Current Depth:
24 Hour Progress:
R/U Test BOPsRig Activity:
Doyon 15
Daily Charges:
Current Pump & Flow Data: Max @ ft Current
4.23 Flow In (spm)
MWD Summary
Bit Type TFA
Cly
RPM Hours Depth in / out
%
Casing
Summary
Condition
in
Mud Data
@
Yesterday's Depth:
Rig:
Job No.:
ROP (ft/hr)
Area:
Location:
96%
SPP (psi)
Gallons/stroke
ROP
Set AtSize
178.9 X-65
Bit #
L-80
Grade
L-80
40.0
3925'
20"
13 3/8"
9 5/8"
BTC
12004' 8079' 10 180 2-1-BT-N-X-I-ER-TR2Hycalog SKHI716D-E4c PDC 12.25" 0.969 39.20
* 10000 units = 100% Gas In Air
-Connection
Chromatograph (ppm)
32
24 hr Recap:
-Background Trip
0
0 0 0
0
0
C-4i C-4n
(current)
C-5n
00
00
Gas Summary
md
install test plug. R/U to test BOPs.
Cont BROOH. CBU x4 @ 9761' MD. Cut & slip drill line, adjust brakes. Cont POOH. L/D BHA#5. Pull wear ring and
Units*
0
0
00Minimum
Average 00
0
0
Depth C-2 C-3
0
Report By:
C-1
0Maximum
C-5i
907-685-0772Unit Phone:
0
Leigh Ann RasherLogging Engineers:Leigh Ann Rasher/Paris Ervin
.
.
Density (ppg) Viscosity
out (sec/qt)
ECD (ppg)Tools
API FL
10
30.0
Depth
21230'to21230'
Avg Min Max
21230' FazePro
Depth Mud Type
YP
1-1-WT-A-E-1-NO-TD
Cor Solids
(lb/100ft2)
3.252.50
Mud (lb/bbl)ml/30min
1
3 Hycalog SKH616M-E1D PDC
Cht Silt Siltst
HYDRIL
Ss
4.5
Lst
12004' 21230'
EVAMAR
Make
9.40
140
40.0
85.90 9226'
25.70
70/30 17
160' 3925'
WOB
29
12-Jan-2013
24:00:00Time:
Report #:
Date:
AK-AM-0900072075
Customer:
Well:
Avg
1.117
1450
16" 3765'
PVOil / Water
8.75 0.902
Footage
ENI Petroleum
SP05-FN7
Spy Island
24 hr Max
North Slope
Lithology (%)
(current)
ShClyst
68.0
Weight
Size
Smith XR+ Milltooth
2-2-CT-A-X-I-BU-TD
160'
3912'
11989'
TuffGvlCoal
$6,971.00
9.0
Alkal Lime
$104,651.00 Report For:
Ratio cP
Keener/Perry/Amend/Buchanan
Flow In (gpm)
Total Charges:
21230'
21230'
0'
Current Depth:
24 Hour Progress:
RIH to spot breakerRig Activity:
Doyon 15
Daily Charges:
Current Pump & Flow Data: Max @ ft Current
4.23 Flow In (spm)
MWD Summary
Bit Type TFA
Cly
RPM Hours Depth in / out
%
Casing
Summary
Condition
in
Mud Data
@
Yesterday's Depth:
Rig:
Job No.:
ROP (ft/hr)
Area:
Location:
96%
SPP (psi)
Gallons/stroke
ROP
Set AtSize
178.9 X-65
Bit #
L-80
Grade
L-80
40.0
3925'
20"
13 3/8"
9 5/8"
BTC
12004' 8079' 10 180 2-1-BT-N-X-I-ER-TR2Hycalog SKHI716D-E4c PDC 12.25" 0.969 39.20
* 10000 units = 100% Gas In Air
-Connection
Chromatograph (ppm)
-
24 hr Recap:
-Background Trip
0
0 0 0
0
0
C-4i C-4n
(current)
C-5n
00
00
Gas Summary
md
NOTE: Daily Cost reflects consumables for this well.
Finish testing BOPs. P/U BHA and RIH to 11530' MD filling every 20 stands.
Units*
0
0
00Minimum
Average 00
0
0
Depth C-2 C-3
0
Report By:
C-1
0Maximum
C-5i
907-685-0772Unit Phone:
0
Emil OpitzLogging Engineers:Emil Opitz / Paris Ervin
.
.
Density (ppg) Viscosity
out (sec/qt)
12004' 8079' 10 180 2-1-BT-N-X-I-ER-TR2Hycalog SKHI716D-E4c PDC 12.25" 0.969 39.20 3925'
20"
13 3/8"
9 5/8"
BTC
L-80
Grade
L-80
40.0
ROP
Set AtSize
178.9 X-65
Bit #
Area:
Location:
96%
SPP (psi)
Gallons/stroke @
Yesterday's Depth:
Rig:
Job No.:
ROP (ft/hr)
Condition
in
Mud Data
Depth in / out
%
Casing
Summary
RPM HoursBit Type TFA
Cly
Current Pump & Flow Data: Max @ ft Current
4.23 Flow In (spm)
MWD Summary
Total Charges:
21230'
21230'
0'
Current Depth:
24 Hour Progress:
POOHRig Activity:
Doyon 15
Daily Charges:$2,810.00
8.9
Alkal Lime
$113,081.00 Report For:
Ratio cP
Keener/Perry/Amend/Buchanan
Flow In (gpm)
TuffGvlCoal
68.0
Weight
Size
Smith XR+ Milltooth
2-2-CT-A-X-I-BU-TD
160'
3912'
11989'
Lithology (%)
(current)
ShClyst
8.75 0.902
Footage
ENI Petroleum
SP05-FN7
Spy Island
24 hr Max
North Slope
Customer:
Well:
Avg
1.117
2059
16" 3765'
PVOil / Water
160' 3925'
WOB
32
15-Jan-2013
24:00:00Time:
Report #:
Date:
AK-AM-0900072075
85.90 9226'
25.70
68/32 23
Ss
-
Lst
12004' 21230'
EVAMAR
Make
9.45
140
40.01
3 Hycalog SKH616M-E1D PDC
Cht Silt Siltst
HYDRIL
YP
1-1-WT-A-E-1-NO-TD
Cor Solids
(lb/100ft2)
3.252.50
Mud (lb/bbl)ml/30min
21230' FazePro
Depth Mud Type
Depth
21230'to21230'
Avg Min MaxECD
(ppg)
Tools
API FL
10
30.0
* 10000 units = 100% Gas In Air
Logging Engineers:Emil Opitz / Paris Ervin
(max)(current)
C-5i
907-685-0772Unit Phone:
0
Emil OpitzReport By:
C-1
0Maximum0
0
Depth C-2 C-3
0Minimum
Average 000
0
00
Units*
per K&M.
Continue to circulate mud and reciprocate pipe until weather cleared up. Pump and spot FazeAway breaker. POOH
md
00
Gas Summary
C-5n
00
C-4i C-4n
0 0 0
0
0
0
Trip -
24 hr Recap:
-Background -Connection
(max)
Chromatograph (ppm)
.
.
Density (ppg) Viscosity
out (sec/qt)
ECD
(ppg)
Tools
API FL
10
30.0
Depth
21230'to21230'
Avg Min Max
21230' KCl Brine
Depth Mud Type
YP
1-1-WT-A-E-1-NO-TD
Cor Solids
(lb/100ft2)Mud (lb/bbl)ml/30min
1
3 Hycalog SKH616M-E1D PDC
Cht Silt Siltst
HYDRIL
Ss Lst
12004' 21230'
EVAMAR
Make
9.15
140
40.0
85.90 9226'
25.70 160' 3925'
WOB
33
16-Jan-2013
24:00:00Time:
Report #:
Date:
AK-AM-0900072075
Customer:
Well:
Avg
1.117
27
16" 3765'
PVOil / Water
8.75 0.902
Footage
ENI Petroleum
SP05-FN7
Spy Island
24 hr Max
North Slope
Lithology (%)
(current)
ShClyst
68.0
Weight
Size
Smith XR+ Milltooth
2-2-CT-A-X-I-BU-TD
160'
3912'
11989'
TuffGvlCoal
$2,810.00
Alkal Lime
$115,891.00 Report For:
Ratio cP
Ross/Perry/Amend/Buchanan
Flow In (gpm)
Total Charges:
21230'
21230'
0'
Current Depth:
24 Hour Progress:
R/U to RIH w/linerRig Activity:
Doyon 15
Daily Charges:
Current Pump & Flow Data: Max @ ft Current
4.23 Flow In (spm)
MWD Summary
Bit Type TFA
Cly
RPM Hours Depth in / out
%
Casing
Summary
Condition
in
Mud Data
@
Yesterday's Depth:
Rig:
Job No.:
ROP (ft/hr)
Area:
Location:
96%
SPP (psi)
Gallons/stroke
ROP
Set AtSize
178.9 X-65
Bit #
L-80
Grade
L-80
40.0
3925'
20"
13 3/8"
9 5/8"
BTC
12004' 8079' 10 180 2-1-BT-N-X-I-ER-TR2Hycalog SKHI716D-E4c PDC 12.25" 0.969 39.20
* 10000 units = 100% Gas In Air
-Connection
(max)
Chromatograph (ppm)
-
24 hr Recap:
-Background Trip
0
0 0 0
0
0
C-4i C-4n C-5n
00
00
Gas Summary
md
Continue to POOH to 11775' MD. Displace to Brine. Cut & Slip. POOH on elevators. L/D BHA. R/U to run 5.5" liner.
Units*
0
0
00Minimum
Average 00
0
0
Depth C-2 C-3
0
Report By:
C-1
0Maximum
C-5i
907-685-0772Unit Phone:
0
Emil OpitzLogging Engineers:Emil Opitz / Paris Ervin
(max)(current)
.
.
Density (ppg) Viscosity
out (sec/qt)
12004' 8079' 10 180 2-1-BT-N-X-I-ER-TR2Hycalog SKHI716D-E4c PDC 12.25" 0.969 39.20 3925'
20"
13 3/8"
9 5/8"
BTC
L-80
Grade
L-80
40.0
ROP
Set AtSize
178.9 X-65
Bit #
Area:
Location:
96%
SPP (psi)
Gallons/stroke @
Yesterday's Depth:
Rig:
Job No.:
ROP (ft/hr)
Condition
in
Mud Data
Depth in / out
%
Casing
Summary
RPM HoursBit Type TFA
Cly
Current Pump & Flow Data: Max @ ft Current
4.23 Flow In (spm)
MWD Summary
Total Charges:
21230'
21230'
0'
Current Depth:
24 Hour Progress:
RIH w/linerRig Activity:
Doyon 15
Daily Charges:$2,810.00
Alkal Lime
$118,701.00 Report For:
Ratio cP
Ross/Perry/Amend/Buchanan
Flow In (gpm)
TuffGvlCoal
68.0
Weight
Size
Smith XR+ Milltooth
2-2-CT-A-X-I-BU-TD
160'
3912'
11989'
Lithology (%)
(current)
ShClyst
8.75 0.902
Footage
ENI Petroleum
SP05-FN7
Spy Island
24 hr Max
North Slope
Customer:
Well:
Avg
1.117
27
16" 3765'
PVOil / Water
160' 3925'
WOB
34
17-Jan-2013
24:00:00Time:
Report #:
Date:
AK-AM-0900072075
85.90 9226'
25.70
Ss Lst
12004' 21230'
EVAMAR
Make
9.15
140
40.01
3 Hycalog SKH616M-E1D PDC
Cht Silt Siltst
HYDRIL
YP
1-1-WT-A-E-1-NO-TD
Cor Solids
(lb/100ft2)Mud (lb/bbl)ml/30min
21230' KCl Brine
Depth Mud Type
Depth
21230'to21230'
Avg Min MaxECD
(ppg)
Tools
API FL
10
30.0
* 10000 units = 100% Gas In Air
Logging Engineers:Emil Opitz / Paris Ervin
(max)(current)
C-5i
907-685-0772Unit Phone:
0
Emil OpitzReport By:
C-1
0Maximum0
0
Depth C-2 C-3
0Minimum
Average 000
0
00
Units*
RIH w/ 5.5" liner
md
00
Gas Summary
C-5n
00
C-4i C-4n
0 0 0
0
0
0
Trip -
24 hr Recap:
-Background -Connection
(max)
Chromatograph (ppm)
.
.
Density (ppg) Viscosity
out (sec/qt)
ECD
(ppg)
Tools
API FL
10
30.0
Depth
21230'to21230'
Avg Min Max
21230' KCl Brine
Depth Mud Type
YP
1-1-WT-A-E-1-NO-TD
Cor Solids
(lb/100ft2)Mud (lb/bbl)ml/30min
1
3 Hycalog SKH616M-E1D PDC
Cht Silt Siltst
HYDRIL
Ss Lst
12004' 21230'
EVAMAR
Make
9.15
140
40.0
85.90 9226'
25.70 160' 3925'
WOB
35
18-Jan-2013
24:00:00Time:
Report #:
Date:
AK-AM-0900072075
Customer:
Well:
Avg
1.117
27
16" 3765'
PVOil / Water
8.75 0.902
Footage
ENI Petroleum
SP05-FN7
Spy Island
24 hr Max
North Slope
Lithology (%)
(current)
ShClyst
68.0
Weight
Size
Smith XR+ Milltooth
2-2-CT-A-X-I-BU-TD
160'
3912'
11989'
TuffGvlCoal
$2,810.00
Alkal Lime
$121,511.00 Report For:
Ratio cP
Ross/Perry/Amend/Buchanan
Flow In (gpm)
Total Charges:
21230'
21230'
0'
Current Depth:
24 Hour Progress:
RIH w/tubingRig Activity:
Doyon 15
Daily Charges:
Current Pump & Flow Data: Max @ ft Current
4.23 Flow In (spm)
MWD Summary
Bit Type TFA
Cly
RPM Hours Depth in / out
%
Casing
Summary
Condition
in
Mud Data
@
Yesterday's Depth:
Rig:
Job No.:
ROP (ft/hr)
Area:
Location:
96%
SPP (psi)
Gallons/stroke
ROP
Set AtSize
178.9 X-65
Bit #
L-80
Grade
L-80
40.0
3925'
20"
13 3/8"
9 5/8"
BTC
12004' 8079' 10 180 2-1-BT-N-X-I-ER-TR2Hycalog SKHI716D-E4c PDC 12.25" 0.969 39.20
* 10000 units = 100% Gas In Air
-Connection
(max)
Chromatograph (ppm)
-
24 hr Recap:
-Background Trip
0
0 0 0
0
0
C-4i C-4n C-5n
00
00
Gas Summary
md
Finish RIH w/ 5.5" liner. L/D 5" DP. R/U to RIH with tubing.
Units*
0
0
00Minimum
Average 00
0
0
Depth C-2 C-3
0
Report By:
C-1
0Maximum
C-5i
907-685-0772Unit Phone:
0
Emil OpitzLogging Engineers:Emil Opitz / Paris Ervin
(max)(current)
.
.
Density (ppg) Viscosity
out (sec/qt)
ECD
(ppg)
Tools
API FL
10
30.0
Depth
21230'to21230'
Avg Min Max
21230' KCl Brine
Depth Mud Type
YP
1-1-WT-A-E-1-NO-TD
Cor Solids
(lb/100ft2)Mud (lb/bbl)ml/30min
1
3 Hycalog SKH616M-E1D PDC
Cht Silt Siltst
HYDRIL
Ss Lst
12004' 21230'
EVAMAR
Make
9.15
140
40.0
85.90 9226'
25.70 160' 3925'
WOB
36
19-Jan-2013
24:00:00Time:
Report #:
Date:
AK-AM-0900072075
Customer:
Well:
Avg
1.117
27
16" 3765'
PVOil / Water
8.75 0.902
Footage
ENI Petroleum
SP05-FN7
Spy Island
24 hr Max
North Slope
Lithology (%)
(current)
ShClyst
68.0
Weight
Size
Smith XR+ Milltooth
2-2-CT-A-X-I-BU-TD
160'
3912'
11989'
TuffGvlCoal
$2,810.00
Alkal Lime
$124,321.00 Report For:
Ratio cP
Ross/Perry/Amend/Buchanan
Flow In (gpm)
Total Charges:
21230'
21230'
0'
Current Depth:
24 Hour Progress:
Prep to RIH w/tubingRig Activity:
Doyon 15
Daily Charges:
Current Pump & Flow Data: Max @ ft Current
4.23 Flow In (spm)
MWD Summary
Bit Type TFA
Cly
RPM Hours Depth in / out
%
Casing
Summary
Condition
in
Mud Data
@
Yesterday's Depth:
Rig:
Job No.:
ROP (ft/hr)
Area:
Location:
96%
SPP (psi)
Gallons/stroke
ROP
Set AtSize
178.9 X-65
Bit #
L-80
Grade
L-80
40.0
3925'
20"
13 3/8"
9 5/8"
BTC
12004' 8079' 10 180 2-1-BT-N-X-I-ER-TR2Hycalog SKHI716D-E4c PDC 12.25" 0.969 39.20
* 10000 units = 100% Gas In Air
-Connection
(max)
Chromatograph (ppm)
-
24 hr Recap:
-Background Trip
0
0 0 0
0
0
C-4i C-4n C-5n
00
00
Gas Summary
md
Finish L/D 4.5" DP. R/U for tubing run.
Units*
0
0
00Minimum
Average 00
0
0
Depth C-2 C-3
0
Report By:
C-1
0Maximum
C-5i
907-685-0772Unit Phone:
0
Emil OpitzLogging Engineers:Emil Opitz / Paris Ervin
(max)(current)
.
.
Density (ppg) Viscosity
out (sec/qt)
12004' 8079' 10 180 2-1-BT-N-X-I-ER-TR2Hycalog SKHI716D-E4c PDC 12.25" 0.969 39.20 3925'
20"
13 3/8"
9 5/8"
BTC
L-80
Grade
L-80
40.0
ROP
Set AtSize
178.9 X-65
Bit #
Area:
Location:
96%
368
87
SPP (psi)
Gallons/stroke
2020
@
Yesterday's Depth:
Rig:
Job No.:
ROP (ft/hr)
Condition
in
Mud Data
Depth in / out
%
Casing
Summary
RPM HoursBit Type TFA
Cly
Current Pump & Flow Data: Max @ ft Current
4.23 Flow In (spm)
MWD Summary
Total Charges:
21230'
21230'
0'
Current Depth:
24 Hour Progress:
Circulate-Wait on weatherRig Activity:
Doyon 15
Daily Charges:$2,810.00
9.0
Alkal Lime
$107,461.00 Report For:
Ratio cP
Keener/Perry/Amend/Buchanan
Flow In (gpm)
TuffGvlCoal
68.0
Weight
Size
Smith XR+ Milltooth
2-2-CT-A-X-I-BU-TD
160'
3912'
11989'
Lithology (%)
(current)
ShClyst
8.75 0.902
Footage
ENI Petroleum
SP05-FN7
Spy Island
24 hr Max
North Slope
Customer:
Well:
Avg
1.117
1450
16" 3765'
PVOil / Water
160' 3925'
WOB
30
13-Jan-2013
24:00:00Time:
Report #:
Date:
AK-AM-0900072075
9.45
85.90 9226'
25.70
70/30 20
Ss
4.7
Lst
12004' 21230'
EVAMAR
Make
9.45
140
40.01
3 Hycalog SKH616M-E1D PDC
Cht Silt Siltst
HYDRIL
YP
1-1-WT-A-E-1-NO-TD
Cor Solids
(lb/100ft2)
3.122.40
Mud (lb/bbl)ml/30min
21230' FazePro
Depth Mud Type
Depth
21230'to21230'
Avg Min MaxECD
(ppg)
Tools
API FL
10
30.0
* 10000 units = 100% Gas In Air
Logging Engineers:Emil Opitz / Paris Ervin
(max)(current)
C-5i
907-685-0772Unit Phone:
0
Emil OpitzReport By:
C-1
0Maximum0
0
Depth C-2 C-3
0Minimum
Average 000
0
00
Units*
Continue to RIH to bottom. Circulate mud and reciprocate pipe - waiting on weather - currently PHASE III CONDITIONS
md
00
Gas Summary
C-5n
00
C-4i C-4n
0 0 0
0
0
0
Trip 341
24 hr Recap:
13Background -Connection
(max)
Chromatograph (ppm)
.
.
Density (ppg) Viscosity
out (sec/qt)
ECD
(ppg)
Tools
API FL
10
30.0
Depth
21230'to21230'
Avg Min Max
21230' FazePro
Depth Mud Type
YP
1-1-WT-A-E-1-NO-TD
Cor Solids
(lb/100ft2)Mud (lb/bbl)ml/30min
1
3 Hycalog SKH616M-E1D PDC
Cht Silt Siltst
HYDRIL
Ss Lst
12004' 21230'
EVAMAR
Make
9.45
140
40.0
9.50
85.90 9226'
25.70 160' 3925'
WOB
31
14-Jan-2013
24:00:00Time:
Report #:
Date:
AK-AM-0900072075
Customer:
Well:
Avg
1.117
50
16" 3765'
PVOil / Water
8.75 0.902
Footage
ENI Petroleum
SP05-FN7
Spy Island
24 hr Max
North Slope
Lithology (%)
(current)
ShClyst
68.0
Weight
Size
Smith XR+ Milltooth
2-2-CT-A-X-I-BU-TD
160'
3912'
11989'
TuffGvlCoal
$2,810.00
Alkal Lime
$110,271.00 Report For:
Ratio cP
Keener/Perry/Amend/Buchanan
Flow In (gpm)
Total Charges:
21230'
21230'
0'
Current Depth:
24 Hour Progress:
Circulate-Wait on weatherRig Activity:
Doyon 15
Daily Charges:
Current Pump & Flow Data: Max @ ft Current
4.23 Flow In (spm)
MWD Summary
Bit Type TFA
Cly
RPM Hours Depth in / out
%
Casing
Summary
Condition
in
Mud Data
@
Yesterday's Depth:
Rig:
Job No.:
ROP (ft/hr)
Area:
Location:
96%
338
80
SPP (psi)
Gallons/stroke
1977
ROP
Set AtSize
178.9 X-65
Bit #
L-80
Grade
L-80
40.0
3925'
20"
13 3/8"
9 5/8"
BTC
12004' 8079' 10 180 2-1-BT-N-X-I-ER-TR2Hycalog SKHI716D-E4c PDC 12.25" 0.969 39.20
* 10000 units = 100% Gas In Air
-Connection
(max)
Chromatograph (ppm)
-
24 hr Recap:
11Background Trip
0
0 0 0
0
0
C-4i C-4n C-5n
00
00
Gas Summary
md
Continue to circulate mud and reciprocate pipe - waiting on weather - currently PHASE III CONDITIONS
Units*
0
0
00Minimum
Average 00
0
0
Depth C-2 C-3
0
Report By:
C-1
0Maximum
C-5i
907-685-0772Unit Phone:
0
Emil OpitzLogging Engineers:Emil Opitz / Paris Ervin
(max)(current)
WELL NAME:SP05-FN7 LOCATION:Spy Island
OPERATOR:Eni Petroleum AREA:North Slope
MUD CO:MI Swaco STATE:Alaska
RIG:Doyon 15 SPUD:16-Dec-12
SPERRY JOB:AK-AM-0900072075 TD:9-Jan-13
BIT RECORD
MWD
BHA#
SDL
RUN #
Bit #Bit Type Bit
Size
Depth
In (ft)
Depth
Out (ft)
Footage Bit
Hours
TFA AVG
ROP
WOB
(max)
RPM
(max)
SPP
(max)
FLOW GPM
(max)
Bit Grade Remarks
2 200 1 Smith XR+ Milltooth 16"160 3925 3765 25.70 1.117 146.3 30 40 2100 850 1-1-WT-A-E-1-NO-TD Surface TD
3 300 2 Hycalog SKHI716D-E4C PDC 12.25"3925 12004 8079 39.20 0.969 206.1 10 180 2500 900 2-1-BT-N-X-I-ER-TR Intermediate TD
5 500 3 Hycalog SKH616M-E1D PDC 8.75"12004 21230 9226 85.90 0.902 107.5 10 140 3400 515 2-2-CT-A-X-I-BU-TD Production TD
WELL NAME:LOCATION:
OPERATOR:AREA:
MUD CO:STATE:
RIG:SPUD:
SPERRY JOB:TD:
Mud Record
Water Based Mud Record
160' to 3925'
3925' to 12004'
Date Depth Wt Vis PV YP Gels Filt
R600/R300/R200/R100/
R6/R3 Cake Solids Oil/Water Sd Pm pH MBT Pf/Mf Chlor Hard Remarks
ft - MD ppg sec lb/100 lb/100ft2 m/30m Rheometer 32nds % vol % vol mg/l Ca++
15-Dec 160 8.60 135 28 33 16/41/50 6.5 89/61/51/38/17/16 3/-3.0 1/96 0.10 0.10 9.4 22.5 .02/.15 1500 60 P/U 5" DP
16-Dec 711 8.85 127 26 43 18/45/50 5.6 95/69/59/46/26/25 2/-2.3 1/97 0.10 0.20 10.0 25.0 .02/.10 1800 80 Drilling ahead
17-Dec 2361 9.35 82 26 32 17/35/42 5.4 84/58/48/36/19/18 2/-4.5 1/95 0.10 0.10 9.8 22.5 .06/.10 1800 60 Drilling ahead
18-Dec 3925 9.30 86 28 38 22/44/57 5.5 94/66/54/40/20/19 2/-5.0 1/94 0.10 0.10 9.7 25.0 .02/.15 1000 40 Back Ream Hole
19-Dec 3925 9.50 108 30 38 22/46/58 5.0 98/68/58/44/24/23 2/-6.0 1/93 0.10 0.10 10.0 25.0 .02/.10 900 40 RIH 13 3/8" Casing
20-Dec 3925 9.60 59 21 14 5/7/8 5.2 56/35/26/17/6/4 2/-5.4 1/94 0.10 0.10 9.5 24.0 .02/.09 900 40 N/U BOP
21-Dec 3925 9.30 47 8 20 7/9/10 6.0 36/28/24/19/10/9 1/-6.0 2/94 0.00 0.10 9.6 0.0 .02/.60 600 40 P/U 5" DP
22-Dec 3925 9.30 48 9 20 9/10/11 6.0 38/29/22/20/11/10 1/-4.0 2/94 0.00 0.10 9.6 0.0 .02/.60 650 40 RIH w/ 5" DP
23-Dec 4943 9.20 51 12 26 11/15/20 6.0 50/38/33/26/12/11 1/-4.0 2/94 0.10 0.15 10.0 7.5 .02/.80 700 60 Drilling ahead
24-Dec 7903 9.30 57 17 29 13/25/29 4.9 63/46/39/30/14/13 1/-5.0 2/93 0.20 0.15 9.8 12.5 .02/.60 1000 60 Drilling ahead
25-Dec 10405 9.35 51 15 25 11/21/23 4.9 55/40/34/27/12/11 1/-6.0 2/92 0.10 0.03 9.8 15.0 .01/.60 1300 60 Drilling ahead
26-Dec 12004 9.50 49 13 23 11/23/27 5.0 49/36/30/24/12/11 1/-6.3 2/91.75 0.10 0.03 9.7 16.5 .01/.50 1300 40 BROOH
27-Dec 12004 9.50 48 13 26 12/25/31 5.6 52/39/33/26/12/11 1/-6.7 2/91.3 0.10 0.05 9.9 18.0 .02/.42 1100 40 BROOH
28-Dec 12004 9.45 47 12 21 10/22/25 5.8 45/33/28/21/11/10 1/-6.7 2/91.3 0.10 0.03 9.7 17.5 .01/.35 1000 40 Circulate
29-Dec 12004 9.50 51 13 18 10/19/24 5.8 44/31/26/20/10/10 1/-6.6 2/91.4 0.10 0.03 9.7 17.5 .02/.44 1000 40 Change Rams
30-Dec 12004 9.55 55 13 24 10/21/26 6.0 50/37/31/24/11/10 1/-6.6 2/91.4 0.10 0.03 9.7 17.5 .01/.45 1000 40 Float 9 5/8" Casing
31-Dec 12004 9.50 49 14 16 8/10/12 -------9.5 ----Prep to N/D BOP
1-Jan 12004 9.45 47 14 16 8/10/12 -------9.5 ----R/U Test BOPE's
2-Jan 11989 9.45 63 14 17 8/12/14 ------------RIH BHA #5
Oil Based Mud Record
12004' to 21230'
Date Depth Wt Vis PV YP Gels Filt
R600/R300/R200/R100/
R6/R3 Cake
Corr.
Solid Oil/Water Oil Pm Lime Salt Cl-
Emul
Stability Sd Remarks
ft - MD ppg sec lb/100 lb/100ft2 m/30m Rheometer 32nds % vol % vol lb/bbl % Wt mg/L mg/l % vol
3-Jan 12254 9.40 52 16 16 6/7/7 4.2 48/32/26/19/7/6 -/2 5.6 67/33 60 2.60 3.38 34.73 102000 400 -Drill 8.75" Hole
4-Jan 13535 9.40 49 15 21 8/8/9 3.6 51/36/29/21/9/8 -/2 7.5 66/34 59 2.60 3.38 31.61 88000 555 0.05 Drill 8.75" Hole
5-Jan 15208 9.40 48 15 19 8/8/9 3.8 49/34/28/21/9/8 -/2 8.2 67/33 60 3.15 4.10 30.15 80000 795 0.05 Drill 8.75" Hole
6-Jan 16482 9.40 48 14 21 8/8/9 4.2 49/35/28/21/9/8 -/2 9.2 67/33 59 2.55 3.32 28.68 74000 770 0.05 Drill 8.75" Hole
7-Jan 17592 9.40 45 13 16 6/7/7 4.0 42/29/23/17/7/6 -/2 9.2 68/32 60 2.50 3.25 28.77 72000 810 0.05 Drill 8.75" Hole
8-Jan 19564 9.40 46 13 19 5/6/7 4.2 45/32/23/10/6/5 -/2 9.6 70/30 61 2.50 3.25 29.54 71000 743 0.04 Drill 8.75" Hole
9-Jan 21146 9.40 46 16 17 5/6/7 4.5 49/33/25/17/6/6 -/2 9.7 69/31 61 2.60 3.38 29.89 73000 770 0.04 Drill 8.75" Hole
10-Jan 21230 9.40 46 15 16 6/6/7 4.7 46/31/23/16/6/5 -/2 8.9 70/30 62 2.50 3.25 30.41 74000 710 0.05 BROOH
11-Jan 21230 9.40 46 13 15 5/6/6 4.4 41/28/21/15/6/5 -/2 9.0 70/30 62 2.70 3.51 30.23 72000 710 0.05 Testing BOPEs
12-Jan 21230 9.40 47 13 15 5/6/6 -41/28/22/15/6/5 -/2 9.0 70/30 62 2.50 3.25 30.23 72000 730 0.05 RIH w/5" DP
Production Section
Intermediate Section
Spy Island
North Slope
Alaska
16-Dec-12
9-Jan-13
SP05-FN7
ENI Petroleum
MI Swaco
Doyon 15
Surface Section
FazePro
MI Spud Mud
LSND
AK-AM-0900072075
Date Depth Wt Vis PV YP Gels Filt
R600/R300/R200/R100/
R6/R3 Cake
Corr.
Solid Oil/Water Oil Pm Lime Salt Cl-
Emul
Stability Sd Remarks
ft - MD ppg sec lb/100 lb/100ft2 m/30m Rheometer 32nds % vol % vol lb/bbl % Wt mg/L mg/l % vol
13-Jan 21230 9.40 50 14 17 6/6/6 -45/31/24/16/6/5 -/2 9.1 70/30 62 2.50 3.25 29.94 71000 725 0.05 Circulating Well
14-Jan 21230 9.45 50 15 19 6/6/7 -49/34/28/20/7/6 -/2 9.0 70/30 62 2.50 3.25 30.53 73000 712 0.05 Circulating Well
15-Jan 21230 9.45 58 18 21 7/8/8 -57/39/33/24/8/7 -/-8.8 68/32 60 2.50 3.25 28.69 72500 710 0.05 POOH
16-Jan 21230 9.45 59 20 23 8/8/9 -63/43/37/27/10/8 -/-8.9 68/32 60 2.50 3.25 28.23 71000 690 0.05 P/U & R/U 5.5" Liner
17-Jan 21230 9.15 28 ------------104000 --RIH 5.5" Liner
18-Jan 21230 9.15 28 ------------104000 --Prep F/ESP Splice
13 3/8" Surface @ 3,912' MD
Casing Record
20" Conductor @ 160' MD
9 5/8" Intermediate @ 11989' MD
Well Name: Depth (MD) to ft
Location: (TVD) to ft
Operator:Show Report No.
Show Report Report Prepared By: Formation:
Report Delivered To: Date Drilled:
SP05-FN7
3933
1
3806
Andrew Buchanan
10800 11400
Spy Island
eni Petroleum
Leigh Ann Rasher
26-Dec-12
N Sand
Dt h ft C1 C1 C1 C1
Hydrocarbon Ratios
Non-producible Hydrocarbons based upon field chromatograph data.
1300Md C h l i d ( / L )53510806
Interpretation:
GU i t
1
Depth ft C1 C1 C1 C1
Flowline Background Show C2 C3 C4 C5
ppm ppm ppm
Hydrocarbon Ratios
C1 -=C1/C2 =
C2 -=C1/C3 =
C3 -=C1/C4 =
C4 -=C1/C5 =
C5 -=
1300Mud Chlorides (mg/L) =
0 0
0
15
219 0
3157 66436 289
219
0
2 #DIV/0!2
535
15 0
63279
4219
31640
10806 Gas Units
1000
NPH
Production
Analysis Gas Oil Water x Non-Producible Hydrocarbons
Depth ft
Flowline Background Show
ppm ppm ppm
Hydrocarbon Ratios
C1 -=C1/C2 =
C2 -=C1/C3 =
1300
225
2800
Mud Chlorides (mg/L) =
591
10994
135476
1204
18
6683
Gas Units
128793
573
2
10
100
Gas
C3 -=C1/C4 =
C4 -=C1/C5 =
C5 -=
Production
Analysis Gas Oil Water x Non-Producible Hydrocarbons
Depth ft C1 C1 C1 C1
Flowline Background Show C2 C3 C4 C5
ppm ppm ppm
Mud Chlorides (mg/L) =1300
46
9
12
1354
14310
12 0
1
9 0
47
11081
10733
Gas Units
Hydrocarbon Ratios3
1
Oil
NPH
pp pp pp
Hydrocarbon Ratios
C1 -=C1/C2 =
C2 -=C1/C3 =
C3 =C1/C4 =
C4 -=C1/C5 =
C5 -=
Production
Analysis Gas Oil Water x Non-Producible Hydrocarbons
30
114799
2050563 18
57
23
121482 6683
1
0
4991
38270 23
211
30
545
4
56
100
1000
NPH
Depth ft
Flowline Background Show
ppm ppm ppm
Hydrocarbon Ratios
C1 -=C1/C2 =
C2 -=C1/C3 =
C3 -=C1/C4 =
C4 -=C1/C5 =
Mud Chlorides (mg/L) =1300
4871
157 12 145
65
35586
112 9
165 29
11372
103 212
226
4 61
504
298
30715
332
136
Gas Units
4
10
NPH
Oil
Gas
C5 -=
Production
Analysis Gas Oil Water x Non-Producible Hydrocarbons
157 12 145
1
NPH
Well Name: Depth (MD) to ft
Location: (TVD) to ft
Operator:Show Report No.
Show Report Report Prepared By: Formation:
Report Delivered To: Date Drilled:
SP05-FN7
3996
2
4008
Andrew Buchanan
12175 13010
Spy Island
eni Petroleum
Leigh Ann Rasher
03-Jan-13 & 04-Jan-13
OA Sand
Dt h ft C1 C1 C1 C1
Hydrocarbon Ratios
Non-producible Hydrocarbons based upon field chromatograph data.
102000Md C h l i d ( / L )106912175
Interpretation:
GU i t
1
Depth ft C1 C1 C1 C1
Flowline Background Show C2 C3 C4 C5
ppm ppm ppm
Hydrocarbon Ratios
C1 -=C1/C2 =
C2 -=C1/C3 =
C3 -=C1/C4 =
C4 -=C1/C5 =
C5 -=
102000Mud Chlorides (mg/L) =
0 65
7
169
448 11
2605 122180 274
437
65
203 1840196
1069
174 5
119575
708
610
12175 Gas Units
1000
NPH
Production
Analysis Gas Oil Water x Non-Producible Hydrocarbons
Depth ft
Flowline Background Show
ppm ppm ppm
Hydrocarbon Ratios
C1 -=C1/C2 =
C2 -=C1/C3 =
90000
268
642
Mud Chlorides (mg/L) =
431
12393
109656
959
45
6214
Gas Units
103442
386
2
10
100
Gas
C3 -=C1/C4 =
C4 -=C1/C5 =
C5 -=
Production
Analysis Gas Oil Water x Non-Producible Hydrocarbons
Depth ft C1 C1 C1 C1
Flowline Background Show C2 C3 C4 C5
ppm ppm ppm
Mud Chlorides (mg/L) =95000
161
63
119
898
1642
133 14
29
113 50
190
12893
869
Gas Units
Hydrocarbon Ratios3
1
Oil
NPH
pp pp pp
Hydrocarbon Ratios
C1 -=C1/C2 =
C2 -=C1/C3 =
C3 =C1/C4 =
C4 -=C1/C5 =
C5 -=
Production
Analysis Gas Oil Water x Non-Producible Hydrocarbons
201
94889
422490 56
269
165
100916 6027
44
49
1249
62489 76
219
152
434
4
225
100
1000
NPH
Depth ft
Flowline Background Show
ppm ppm ppm
Hydrocarbon Ratios
C1 -=C1/C2 =
C2 -=C1/C3 =
C3 -=C1/C4 =
C4 -=C1/C5 =
Mud Chlorides (mg/L) =95000
4345
204 41 163
261
96669
162 61
455 27
13010
101 566
216
27 234
395
914
92324
857
428
Gas Units
4
10
NPH
Oil
Gas
C5 -=
Production
Analysis Gas Oil Water x Non-Producible Hydrocarbons
204 41 163
1
NPH
Well Name: Depth (MD) to ft
Location: (TVD) to ft
Operator:Show Report No.
Show Report Report Prepared By: Formation:
Report Delivered To: Date Drilled:
SP05-FN7
3977
3
3980
Andrew Buchanan
13800 14300
Spy Island
eni Petroleum
Leigh Ann Rasher
5-Jan-13
OA Sand
Dt h ft C1 C1 C1 C1
Hydrocarbon Ratios
Non-producible Hydrocarbons based upon field chromatograph data.
89000Md C h l i d ( / L )99113799
Interpretation:
GU i t
1
Depth ft C1 C1 C1 C1
Flowline Background Show C2 C3 C4 C5
ppm ppm ppm
Hydrocarbon Ratios
C1 -=C1/C2 =
C2 -=C1/C3 =
C3 -=C1/C4 =
C4 -=C1/C5 =
C5 -=
89000Mud Chlorides (mg/L) =
32 127
40
284
522 22
4893 110342 211
500
159
400 830360
991
301 17
105449
371
293
13799 Gas Units
1000
NPH
Production
Analysis Gas Oil Water x Non-Producible Hydrocarbons
Depth ft
Flowline Background Show
ppm ppm ppm
Hydrocarbon Ratios
C1 -=C1/C2 =
C2 -=C1/C3 =
89000
207
363
Mud Chlorides (mg/L) =
542
13936
111644
1028
32
6090
Gas Units
105554
510
2
10
100
Gas
C3 -=C1/C4 =
C4 -=C1/C5 =
C5 -=
Production
Analysis Gas Oil Water x Non-Producible Hydrocarbons
Depth ft C1 C1 C1 C1
Flowline Background Show C2 C3 C4 C5
ppm ppm ppm
Mud Chlorides (mg/L) =85000
291
137
200
980
770
237 37
25
188 51
316
14215
528
Gas Units
Hydrocarbon Ratios3
1
Oil
NPH
pp pp pp
Hydrocarbon Ratios
C1 -=C1/C2 =
C2 -=C1/C3 =
C3 =C1/C4 =
C4 -=C1/C5 =
C5 -=
Production
Analysis Gas Oil Water x Non-Producible Hydrocarbons
278
100548
330563 53
351
220
108376 7828
46
62
817
46697 123
197
216
510
4
305
100
1000
NPH
Depth ft
Flowline Background Show
ppm ppm ppm
Hydrocarbon Ratios
C1 -=C1/C2 =
C2 -=C1/C3 =
C3 -=C1/C4 =
C4 -=C1/C5 =
Mud Chlorides (mg/L) =85000
9673
294 83 211
370
132571
234 161
590 95
14304
73 582
248
84 286
430
1684
122898
1228
495
Gas Units
4
10
NPH
Oil
Gas
C5 -=
Production
Analysis Gas Oil Water x Non-Producible Hydrocarbons
294 83 211
1
NPH
Well Name: Depth (MD) to ft
Location: (TVD) to ft
Operator:Show Report No.
Show Report Report Prepared By: Formation:
Report Delivered To: Date Drilled:
SP05-FN7
3989
4
3979
Andrew Buchanan
14561 15058
Spy Island
eni Petroleum
Leigh Ann Rasher
5-Jan-13
OA Sand
Dt h ft C1 C1 C1 C1
Hydrocarbon Ratios
Non-producible Hydrocarbons based upon field chromatograph data.
85000Md C h l i d ( / L )362514561
Interpretation:
GU i t
1
Depth ft C1 C1 C1 C1
Flowline Background Show C2 C3 C4 C5
ppm ppm ppm
Hydrocarbon Ratios
C1 -=C1/C2 =
C2 -=C1/C3 =
C3 -=C1/C4 =
C4 -=C1/C5 =
C5 -=
85000Mud Chlorides (mg/L) =
115 111
221
258
632 114
13346 282412 519
518
226
528 2424307
3625
369 111
269066
1043
876
14561 Gas Units
1000
NPH
Production
Analysis Gas Oil Water x Non-Producible Hydrocarbons
Depth ft
Flowline Background Show
ppm ppm ppm
Hydrocarbon Ratios
C1 -=C1/C2 =
C2 -=C1/C3 =
85000
554
1128
Mud Chlorides (mg/L) =
557
14729
266482
3126
119
23994
Gas Units
242488
438
2
10
100
Gas
C3 -=C1/C4 =
C4 -=C1/C5 =
C5 -=
Production
Analysis Gas Oil Water x Non-Producible Hydrocarbons
Depth ft C1 C1 C1 C1
Flowline Background Show C2 C3 C4 C5
ppm ppm ppm
Mud Chlorides (mg/L) =84000
215
-12
147
4943
-20207
266 119
110
207 219
325
14835
1650
Gas Units
Hydrocarbon Ratios3
1
Oil
NPH
pp pp pp
Hydrocarbon Ratios
C1 -=C1/C2 =
C2 -=C1/C3 =
C3 =C1/C4 =
C4 -=C1/C5 =
C5 -=
Production
Analysis Gas Oil Water x Non-Producible Hydrocarbons
344
289603
859836 117
448
273
314266 24663
111
128
6436
1341228 45
403
216
719
4
337
100
1000
NPH
Depth ft
Flowline Background Show
ppm ppm ppm
Hydrocarbon Ratios
C1 -=C1/C2 =
C2 -=C1/C3 =
C3 -=C1/C4 =
C4 -=C1/C5 =
Mud Chlorides (mg/L) =84000
20342
299 93 206
373
307864
239 140
660 60
15058
99 1396
479
58 315
913
2904
287522
4671
600
Gas Units
4
10
NPH
Oil
Gas
C5 -=
Production
Analysis Gas Oil Water x Non-Producible Hydrocarbons
299 93 206
1
NPH
Well Name: Depth (MD) to ft
Location: (TVD) to ft
Operator:Show Report No.
Show Report Report Prepared By: Formation:
Report Delivered To: Date Drilled:
SP05-FN7
3974
5
3999
Andrew Buchanan
15610 17083
Spy Island
eni Petroleum
Leigh Ann Rasher
1/6/2013-1/7/2013
OA Sand
Dt h ft C1 C1 C1 C1
Hydrocarbon Ratios
Non-producible Hydrocarbons based upon field chromatograph data.
77000Md C h l i d ( / L )97315610
Interpretation:
GU i t
1
Depth ft C1 C1 C1 C1
Flowline Background Show C2 C3 C4 C5
ppm ppm ppm
Hydrocarbon Ratios
C1 -=C1/C2 =
C2 -=C1/C3 =
C3 -=C1/C4 =
C4 -=C1/C5 =
C5 -=
77000Mud Chlorides (mg/L) =
57 141
61
263
474 18
2696 106294 227
456
198
427 735366
973
283 20
103598
394
283
15610 Gas Units
1000
NPH
Production
Analysis Gas Oil Water x Non-Producible Hydrocarbons
Depth ft
Flowline Background Show
ppm ppm ppm
Hydrocarbon Ratios
C1 -=C1/C2 =
C2 -=C1/C3 =
78000
211
353
Mud Chlorides (mg/L) =
504
15935
103777
946
31
4003
Gas Units
99774
473
2
10
100
Gas
C3 -=C1/C4 =
C4 -=C1/C5 =
C5 -=
Production
Analysis Gas Oil Water x Non-Producible Hydrocarbons
Depth ft C1 C1 C1 C1
Flowline Background Show C2 C3 C4 C5
ppm ppm ppm
Mud Chlorides (mg/L) =72000
283
135
198
932
739
264 66
30
216 81
313
16810
504
Gas Units
Hydrocarbon Ratios3
1
Oil
NPH
pp pp pp
Hydrocarbon Ratios
C1 -=C1/C2 =
C2 -=C1/C3 =
C3 =C1/C4 =
C4 -=C1/C5 =
C5 -=
Production
Analysis Gas Oil Water x Non-Producible Hydrocarbons
265
120743
401518 0
317
217
121859 1116
16
45
714
54948 169
233
220
518
4
301
100
1000
NPH
Depth ft
Flowline Background Show
ppm ppm ppm
Hydrocarbon Ratios
C1 -=C1/C2 =
C2 -=C1/C3 =
C3 -=C1/C4 =
C4 -=C1/C5 =
Mud Chlorides (mg/L) =72000
1787
227 46 181
256
94347
185 53
405 17
17083
132 511
239
19 237
391
701
92560
880
388
Gas Units
4
10
NPH
Oil
Gas
C5 -=
Production
Analysis Gas Oil Water x Non-Producible Hydrocarbons
227 46 181
1
NPH
Well Name: Depth (MD) to ft
Location: (TVD) to ft
Operator:Show Report No.
Show Report Report Prepared By: Formation:
Report Delivered To: Date Drilled:
SP05-FN7
3928
6
3966
Andrew Buchanan
19186 20456
Spy Island
eni Petroleum
Leigh Ann Rasher
1/8/2013-1/9/2013
OA Sand
Dt h ft C1 C1 C1 C1
Hydrocarbon Ratios
Non-producible Hydrocarbons based upon field chromatograph data.
71000Md C h l i d ( / L )122819186
Interpretation:
GU i t
1
Depth ft C1 C1 C1 C1
Flowline Background Show C2 C3 C4 C5
ppm ppm ppm
Hydrocarbon Ratios
C1 -=C1/C2 =
C2 -=C1/C3 =
C3 -=C1/C4 =
C4 -=C1/C5 =
C5 -=
71000Mud Chlorides (mg/L) =
62 129
80
262
451 26
3693 128607 294
425
191
454 968374
1228
291 29
124914
477
334
19186 Gas Units
1000
NPH
Production
Analysis Gas Oil Water x Non-Producible Hydrocarbons
Depth ft
Flowline Background Show
ppm ppm ppm
Hydrocarbon Ratios
C1 -=C1/C2 =
C2 -=C1/C3 =
71000
266
425
Mud Chlorides (mg/L) =
387
19537
97148
898
50
7498
Gas Units
89650
337
2
10
100
Gas
C3 -=C1/C4 =
C4 -=C1/C5 =
C5 -=
Production
Analysis Gas Oil Water x Non-Producible Hydrocarbons
Depth ft C1 C1 C1 C1
Flowline Background Show C2 C3 C4 C5
ppm ppm ppm
Mud Chlorides (mg/L) =72000
211
52
144
1009
1724
235 91
54
189 137
265
20285
623
Gas Units
Hydrocarbon Ratios3
1
Oil
NPH
pp pp pp
Hydrocarbon Ratios
C1 -=C1/C2 =
C2 -=C1/C3 =
C3 =C1/C4 =
C4 -=C1/C5 =
C5 -=
Production
Analysis Gas Oil Water x Non-Producible Hydrocarbons
256
103147
411422 26
281
201
107847 4700
30
75
973
57095 106
260
181
396
4
251
100
1000
NPH
Depth ft
Flowline Background Show
ppm ppm ppm
Hydrocarbon Ratios
C1 -=C1/C2 =
C2 -=C1/C3 =
C3 -=C1/C4 =
C4 -=C1/C5 =
Mud Chlorides (mg/L) =71000
1983
231 62 169
251
95925
181 68
376 13
20456
113 556
259
20 231
407
831
93942
877
363
Gas Units
4
10
NPH
Oil
Gas
C5 -=
Production
Analysis Gas Oil Water x Non-Producible Hydrocarbons
231 62 169
1
NPH
Marker MD INC AZ TVD TVDSS
16" Surface Borehole
20" Conductor Shoe 160.0 0.6 323.9 160.0 -105.9
SV-4 771.0 19.0 337.5 760.4 -706.8
SV-3 1,168.0 30.7 336.3 1,119.7 -1,066.1
SV-2 1,486.0 41.1 338.2 1,377.6 -1,324.0
Permafrost Base 2,004.0 45.4 336.7 1,752.3 -1,698.7
SV-1 2,281.0 49.5 336.8 1,941.8 -1,888.2
Ugnu Top (UG4)2,981.0 76.1 331.3 2,262.9 -2,209.3
13 3/8" Surface Casing Shoe 3,912.0 78.0 329.4 2,453.6 -2,400.0
TD 16" Borehole 3,925.0 78.1 329.3 2,456.3 -2,402.7
12 1/4" Intermediate Borehole
UG-2 Coal Bed Marker 5,650.0 78.5 330.7 2,798.9 -2,745.3
Lower Ugnu 9,207.0 78.6 330.5 3,497.8 -3,444.2
Schrader Bluff Top 10,506.0 78.6 330.1 3,756.7 -3,703.1
N Sequence Top 10,710.0 78.6 329.6 3,797.0 -3,743.4
N Top 10,972.0 78.5 331.2 3,848.7 -3,795.1
N-2 Top 11,073.0 78.1 331.7 3,869.3 -3,815.7
N-3 Top 11,086.0 78.0 331.7 3,872.0 -3,818.4
N Bottom 11,127.0 78.6 332.1 3,880.3 -3,826.7
Lower N Marker 11,235.0 79.0 331.4 3,901.3 -3,847.7
N Sequence Base 11,469.0 82.0 327.0 3,941.5 -3,887.9
9 5/8" Intermediate Casing 11,989.0 83.9 322.1 3,997.1 -3,943.5
OA Top 11,974.0 84.1 322.0 3,995.8 -3,942.2
TD 12 1/4" Borehole 12,004.0 83.7 322.2 3,998.7 -3,945.1
8 3/4" Lateral Borehole
OA-2 Top 12,096.0 86.2 322.0 4,007.2 -3,953.6
OA-3 Top 12,119.0 87.0 321.9 4,009.1 -3,955.5
SP05-FN7 Fault A 12,594.0 90.4 321.0 4,013.5 -3,959.9
OA-4 Top 12,873.0 93.2 321.7 4,004.6 -3,951.0
OA-3 Top 13,614.0 92.5 317.1 3,985.7 -3,932.1
OA-2 Top 13,686.0 91.8 318.1 3,983.1 -3,929.5
OA-2 Top 14,965.0 87.2 319.4 3,987.4 -3,933.8
OA-3 Top 15,033.0 87.1 318.2 3,990.5 -3,936.9
OA-4 Top 15,331.0 88.4 314.1 4,001.3 -3,947.7
OA-4 Top 15,560.0 91.4 313.4 3,999.9 -3,946.3
SP05-FN7 Fault B 16,053.0 91.5 309.8 3,992.9 -3,939.3
OA-3 Top 16,129.0 93.2 312.8 3,990.0 -3,936.4
OA-2 Top 16,367.0 92.1 312.6 3,981.7 -3,928.1
OA-2 Top 17,890.0 88.7 309.8 3,969.0 -3,915.4
OA-3 Top 18,100.0 88.7 311.3 3,973.8 -3,920.2
OA-4 Top 18,453.0 88.6 313.2 3,983.1 -3,929.5
OA Bottom 18,512.0 89.5 313.4 3,983.8 -3,930.2
OA Bottom 18,761.0 94.1 313.7 3,979.2 -3,925.6
OA-4 Top 18,794.0 94.1 313.1 3,976.9 -3,923.3
OA-3 Top 19,811.0 93.5 310.3 3,947.7 -3,894.1
OA-2 Top 19,935.0 92.5 310.4 3,941.0 -3,887.4
OA Top 20,549.0 93.5 313.7 3,924.0 -3,870.4
N Bottom 21,063.7 113.2 308.7 3,799.7 -3,746.1
N Top 21,128.0 113.5 308.5 3,774.3 -3,720.7
TD 8 3/4" Borehole 21,230.0 113.5 308.6 3,733.6 -3,680.0
8 3/4" PB1
Sidetrack Point 16,485.0 92.1 313.8 3,976.7 -3,923.1
OA Top 16,574.0 93.6 313.0 3,970.5 -3,916.9
TD PB1 16,665.0 93.6 312.9 3,964.8 -3,911.2
SP05-FN7 Interpolated Tops
DIRECTIONAL SURVEY REPORT
Eni Petroleum
SP05-FN7
Nikaitchuq
Alaska
USA
AK-XX-0900072075
Measured Vertical Vertical
Depth Inclination Direction Depth Latitude Departure Section Dogleg
(feet) (degrees) (degrees) (feet) (feet) (feet) (feet) (deg/100ft)
0.00 0.00 0.00 0.00 0.00 N 0.00 E 0.00 TIE-IN
40.52 0.00 336.24 40.52 0.00 N 0.00 E 0.00 0.00
67.09 0.42 320.50 67.09 0.08 N 0.06 W 0.10 1.58
118.16 0.54 322.37 118.16 0.41 N 0.33 W 0.52 0.24
163.03 0.62 323.95 163.03 0.77 N 0.60 W 0.98 0.18
193.31 0.92 329.69 193.30 1.12 N 0.82 W 1.38 1.02
223.33 1.23 335.95 223.32 1.62 N 1.07 W 1.94 1.10
256.27 1.61 332.51 256.25 2.35 N 1.43 W 2.74 1.18
294.47 2.03 338.21 294.43 3.46 N 1.93 W 3.92 1.20
355.66 4.33 340.65 355.52 6.64 N 3.10 W 7.18 3.76
386.66 5.61 341.13 386.40 9.18 N 3.97 W 9.74 4.13
448.49 8.02 341.40 447.79 16.13 N 6.33 W 16.71 3.90
540.60 12.20 341.17 538.45 31.44 N 11.52 W 32.09 4.54
634.32 14.37 341.30 629.66 51.83 N 18.45 W 52.58 2.32
692.58 17.08 337.70 685.73 66.60 N 24.01 W 67.74 4.94
784.59 19.31 337.46 773.14 93.15 N 34.97 W 95.58 2.43
877.83 22.41 336.45 860.26 123.69 N 47.99 W 127.84 3.35
970.72 25.38 335.56 945.17 158.05 N 63.30 W 164.55 3.22
1064.17 27.33 336.01 1028.91 195.89 N 80.31 W 205.04 2.10
1157.52 30.56 336.16 1110.59 237.18 N 98.62 W 249.09 3.46
1250.88 31.84 337.59 1190.44 281.66 N 117.60 W 296.10 1.58
1344.35 36.25 336.70 1267.87 329.86 N 137.94 W 346.90 4.75
1437.81 40.63 337.93 1341.06 383.46 N 160.32 W 403.24 4.76
1531.21 41.61 338.49 1411.42 440.50 N 183.11 W 462.59 1.12
1624.53 42.23 338.11 1480.86 498.43 N 206.17 W 522.81 0.72
1717.90 44.44 337.10 1548.77 557.66 N 230.59 W 584.90 2.48
1811.16 44.55 337.39 1615.29 617.93 N 255.87 W 648.33 0.25
1904.49 44.45 337.29 1681.86 678.30 N 281.07 W 711.79 0.13
1997.80 45.33 336.61 1747.96 738.89 N 306.86 W 775.78 1.07
2091.13 46.48 337.56 1812.91 800.63 N 332.95 W 840.87 1.43
2183.73 46.56 337.10 1876.63 862.63 N 358.85 W 906.05 0.37
2277.84 49.38 336.85 1939.63 926.96 N 386.19 W 973.97 3.00
2371.18 51.83 336.70 1998.86 993.24 N 414.63 W 1044.11 2.63
2464.63 55.30 334.50 2054.36 1061.68 N 445.71 W 1117.55 4.17
2557.94 61.09 333.17 2103.52 1132.81 N 480.69 W 1195.48 6.32
2651.33 63.08 334.40 2147.24 1206.84 N 517.14 W 1276.61 2.43
2744.56 66.05 334.31 2187.27 1282.73 N 553.57 W 1359.23 3.19
2838.01 70.21 333.03 2222.08 1360.43 N 592.04 W 1444.52 4.63
2931.34 74.08 331.12 2250.69 1438.90 N 633.65 W 1532.29 4.58
3024.68 77.95 331.48 2273.24 1518.33 N 677.13 W 1621.96 4.16
3118.86 76.25 332.36 2294.27 1599.32 N 720.34 W 1712.72 2.02
3211.30 78.69 331.12 2314.32 1678.79 N 763.07 W 1801.98 2.95
3305.24 80.31 331.20 2331.44 1759.70 N 807.62 W 1893.47 1.73
3397.95 80.13 330.36 2347.19 1839.44 N 852.22 W 1984.05 0.91
3491.28 78.50 329.97 2364.50 1918.99 N 897.85 W 2075.10 1.79
3584.75 77.29 329.73 2384.10 1998.02 N 943.75 W 2165.89 1.32
3677.97 79.06 330.03 2403.20 2076.94 N 989.53 W 2256.53 1.92
3771.32 76.63 328.99 2422.85 2155.57 N 1035.83 W 2347.24 2.82
3842.49 77.46 329.81 2438.81 2215.27 N 1071.13 W 2416.20 1.62
3925.00 77.46 329.81 2456.72 2284.88 N 1111.63 W 2496.22 0.00
3939.71 78.42 330.54 2459.80 2297.36 N 1118.79 W 2510.50 8.13
4033.48 78.54 329.71 2478.52 2377.03 N 1164.56 W 2601.73 0.88
4127.16 78.55 329.79 2497.13 2456.35 N 1210.81 W 2692.96 0.08
4219.98 78.36 330.54 2515.71 2535.23 N 1256.05 W 2783.25 0.82
4313.43 78.75 330.40 2534.25 2614.93 N 1301.20 W 2874.12 0.44
4407.33 78.84 329.99 2552.49 2694.85 N 1346.98 W 2965.56 0.44
4499.91 78.92 330.30 2570.35 2773.64 N 1392.20 W 3055.76 0.34
4593.23 78.54 331.50 2588.59 2853.61 N 1436.71 W 3146.47 1.33
4686.61 78.57 332.00 2607.12 2934.23 N 1480.03 W 3237.00 0.53
4780.02 78.51 331.93 2625.68 3015.03 N 1523.06 W 3327.50 0.10
4873.48 78.39 332.72 2644.39 3096.12 N 1565.59 W 3417.93 0.84
4966.87 78.34 332.86 2663.22 3177.47 N 1607.41 W 3508.14 0.16
5060.30 78.57 332.99 2681.92 3258.98 N 1649.08 W 3598.39 0.28
5153.71 78.57 332.48 2700.43 3340.37 N 1691.02 W 3688.71 0.54
5247.20 78.54 332.28 2718.99 3421.55 N 1733.50 W 3779.19 0.21
5340.59 79.01 333.06 2737.17 3502.93 N 1775.56 W 3869.57 0.96
5434.01 78.34 332.25 2755.51 3584.30 N 1817.63 W 3959.94 1.11
5527.27 78.46 332.43 2774.26 3665.21 N 1860.04 W 4050.16 0.23
5620.61 78.42 331.91 2792.97 3746.08 N 1902.73 W 4140.51 0.55
5714.02 78.54 331.89 2811.62 3826.82 N 1945.84 W 4231.01 0.13
5807.45 78.78 332.03 2829.99 3907.67 N 1988.91 W 4321.57 0.30
5900.87 78.89 332.58 2848.08 3988.82 N 2031.50 W 4412.09 0.59
5994.21 78.61 331.40 2866.29 4069.65 N 2074.50 W 4502.58 1.28
6087.62 78.31 332.42 2884.98 4150.39 N 2117.59 W 4593.07 1.12
6181.72 78.57 330.84 2903.84 4231.50 N 2161.39 W 4684.28 1.67
6274.41 78.46 330.93 2922.30 4310.86 N 2205.59 W 4774.32 0.15
6367.80 78.49 331.23 2940.95 4390.95 N 2249.84 W 4864.98 0.32
6461.13 78.34 332.11 2959.70 4471.43 N 2293.23 W 4955.43 0.94
6554.47 78.40 331.28 2978.51 4551.92 N 2336.58 W 5045.87 0.87
6647.92 78.95 331.89 2996.87 4632.51 N 2380.18 W 5136.54 0.87
6741.63 78.69 331.21 3015.04 4713.34 N 2423.98 W 5227.52 0.76
6834.76 78.75 332.60 3033.25 4793.91 N 2466.99 W 5317.82 1.47
6928.16 78.89 332.26 3051.36 4875.13 N 2509.39 W 5408.28 0.39
7021.59 78.69 332.45 3069.53 4956.32 N 2551.92 W 5498.78 0.29
7114.90 78.87 332.53 3087.68 5037.49 N 2594.19 W 5589.13 0.21
7208.36 78.75 331.65 3105.82 5118.51 N 2637.11 W 5679.74 0.93
7301.82 78.81 332.36 3124.00 5199.46 N 2680.14 W 5770.35 0.75
7395.00 78.83 328.92 3142.08 5279.12 N 2724.95 W 5861.00 3.62
7395.19 78.92 331.72 3142.11 5279.28 N 2725.05 W 5861.18 1.81
7488.37 79.01 330.63 3160.02 5358.29 N 2771.08 W 5952.04 1.81
7581.67 79.01 330.71 3177.81 5438.14 N 2815.94 W 6042.87 0.08
7675.01 78.05 330.75 3196.37 5517.93 N 2860.66 W 6133.57 1.03
7768.30 78.66 331.00 3215.20 5597.75 N 2905.13 W 6224.14 0.70
7861.76 78.81 331.24 3233.46 5678.01 N 2949.40 W 6314.95 0.30
7955.21 78.80 332.63 3251.60 5758.90 N 2992.53 W 6405.57 1.46
8048.69 78.86 333.05 3269.71 5840.49 N 3034.40 W 6496.01 0.45
8142.06 78.75 332.53 3287.84 5921.95 N 3076.28 W 6586.35 0.56
8235.50 79.01 333.33 3305.86 6003.59 N 3118.00 W 6676.74 0.88
8328.89 78.92 333.13 3323.74 6085.43 N 3159.29 W 6767.03 0.23
8422.34 78.84 332.94 3341.76 6167.16 N 3200.87 W 6857.40 0.22
8515.81 78.89 332.54 3359.81 6248.68 N 3242.87 W 6947.86 0.42
8609.17 78.60 333.44 3378.03 6330.26 N 3284.45 W 7038.12 1.00
8702.51 78.45 331.80 3396.60 6411.48 N 3326.52 W 7128.38 1.73
8795.70 78.22 332.56 3415.44 6492.20 N 3369.11 W 7218.55 0.84
8889.15 78.43 332.42 3434.35 6573.37 N 3411.39 W 7308.89 0.27
8982.53 78.72 332.11 3452.85 6654.38 N 3453.98 W 7399.30 0.45
9076.81 78.57 331.79 3471.41 6735.96 N 3497.45 W 7490.68 0.37
9169.37 78.43 331.27 3489.87 6815.69 N 3540.69 W 7580.44 0.57
9262.75 78.78 331.33 3508.32 6895.98 N 3584.65 W 7671.09 0.38
9356.06 78.31 332.15 3526.85 6976.53 N 3627.95 W 7761.54 1.00
9449.75 78.43 332.72 3545.74 7057.88 N 3670.41 W 7852.14 0.61
9543.20 78.57 332.46 3564.37 7139.18 N 3712.57 W 7942.52 0.31
9636.58 78.19 332.34 3583.18 7220.23 N 3754.94 W 8032.83 0.43
9730.09 78.84 331.16 3601.80 7300.95 N 3798.32 W 8123.47 1.42
9823.41 78.77 332.45 3619.91 7381.63 N 3841.57 W 8214.00 1.36
9917.13 78.58 331.46 3638.32 7462.74 N 3884.77 W 8304.84 1.06
10010.29 78.57 331.05 3656.77 7542.80 N 3928.69 W 8395.28 0.43
10103.75 78.49 331.12 3675.36 7622.97 N 3972.97 W 8486.02 0.11
10197.22 78.66 332.12 3693.87 7703.58 N 4016.52 W 8576.67 1.06
10290.65 78.22 330.84 3712.60 7784.01 N 4060.22 W 8667.27 1.42
10383.98 78.22 330.98 3731.65 7863.84 N 4104.64 W 8757.83 0.15
10477.39 78.63 331.41 3750.39 7944.03 N 4148.74 W 8848.47 0.63
10570.85 78.64 331.15 3768.81 8024.39 N 4192.77 W 8939.21 0.27
10664.23 78.48 330.13 3787.33 8104.15 N 4237.64 W 9029.98 1.08
10758.32 78.81 330.96 3805.86 8184.48 N 4283.00 W 9121.49 0.93
10851.52 78.57 332.09 3824.14 8264.81 N 4326.57 W 9211.93 1.22
10944.38 78.75 332.54 3842.39 8345.43 N 4368.87 W 9301.85 0.51
11037.67 77.79 332.95 3861.36 8426.63 N 4410.70 W 9391.95 1.12
11131.04 78.66 333.20 3880.41 8508.13 N 4452.09 W 9482.03 0.97
11224.31 78.95 332.47 3898.52 8589.53 N 4493.87 W 9572.26 0.83
11317.65 79.27 330.67 3916.16 8670.13 N 4537.50 W 9662.96 1.92
11411.57 80.85 328.85 3932.37 8750.05 N 4584.09 W 9754.87 2.54
11504.44 82.70 327.68 3945.66 8828.21 N 4632.44 W 9846.43 2.35
11598.76 83.82 327.09 3956.73 8907.11 N 4682.92 W 9939.86 1.34
11691.17 83.82 326.55 3966.68 8984.00 N 4733.20 W 10031.56 0.58
11784.52 84.44 325.09 3976.22 9060.82 N 4785.37 W 10124.33 1.69
11877.83 84.38 323.29 3985.31 9136.13 N 4839.70 W 10217.18 1.92
11956.77 84.29 323.16 3993.11 9199.05 N 4886.73 W 10295.73 0.20
12004.00 84.29 321.84 3997.80 9236.33 N 4915.34 W 10342.72 2.78
12025.32 83.46 322.42 4000.08 9253.07 N 4928.35 W 10363.92 4.74
12118.66 87.03 321.91 4007.82 9326.52 N 4985.40 W 10456.90 3.86
12211.99 87.61 321.77 4012.18 9399.82 N 5043.00 W 10550.10 0.64
12305.28 89.16 320.96 4014.81 9472.66 N 5101.22 W 10643.29 1.87
12398.54 91.24 322.01 4014.48 9545.63 N 5159.30 W 10736.50 2.50
12491.93 90.45 321.50 4013.11 9618.96 N 5217.10 W 10829.85 1.01
12585.26 90.43 321.02 4012.39 9691.76 N 5275.50 W 10923.12 0.51
12678.48 90.58 320.72 4011.57 9764.07 N 5334.33 W 11016.25 0.36
12771.95 92.87 320.86 4008.75 9836.45 N 5393.39 W 11109.58 2.45
12865.30 93.26 321.69 4003.76 9909.18 N 5451.70 W 11202.74 0.98
12958.74 92.70 321.61 3998.91 9982.36 N 5509.60 W 11296.01 0.61
13052.02 92.09 321.52 3995.01 10055.36 N 5567.53 W 11389.17 0.66
13145.31 90.37 320.03 3993.00 10127.61 N 5626.51 W 11482.34 2.44
13238.64 89.34 320.81 3993.24 10199.54 N 5685.97 W 11575.55 1.38
13331.92 92.39 321.24 3991.83 10272.04 N 5744.63 W 11668.74 3.30
13425.21 92.02 320.90 3988.24 10344.56 N 5803.21 W 11761.89 0.54
13518.56 90.00 320.08 3986.60 10416.56 N 5862.59 W 11855.11 2.34
13612.23 92.48 317.03 3984.57 10486.75 N 5924.56 W 11948.42 4.20
13705.29 91.67 318.42 3981.20 10555.56 N 5987.12 W 12040.97 1.73
13798.75 90.89 318.54 3979.11 10625.51 N 6049.05 W 12134.08 0.84
13892.07 90.30 318.60 3978.14 10695.48 N 6110.80 W 12227.08 0.64
13985.32 90.47 318.07 3977.52 10765.14 N 6172.79 W 12319.98 0.60
14078.64 90.41 319.04 3976.80 10835.09 N 6234.56 W 12412.98 1.04
14172.02 90.27 320.01 3976.25 10906.12 N 6295.17 W 12506.15 1.05
14265.44 90.01 319.58 3976.02 10977.47 N 6355.47 W 12599.40 0.54
14358.89 89.48 318.78 3976.43 11048.18 N 6416.56 W 12692.61 1.03
14452.28 89.58 320.05 3977.20 11119.10 N 6477.31 W 12785.78 1.36
14545.71 89.34 321.73 3978.08 11191.59 N 6536.24 W 12879.12 1.82
14639.12 89.32 322.49 3979.17 11265.31 N 6593.61 W 12972.50 0.81
14732.61 89.48 320.74 3980.15 11338.58 N 6651.65 W 13065.94 1.88
14826.00 88.96 319.24 3981.42 11410.10 N 6711.69 W 13159.17 1.70
14919.42 87.96 320.11 3983.94 11481.30 N 6772.12 W 13252.36 1.42
15012.68 86.46 318.57 3988.47 11551.96 N 6832.81 W 13345.29 2.30
15106.02 89.16 317.02 3992.04 11621.04 N 6895.46 W 13438.12 3.33
15199.43 87.37 314.47 3994.87 11687.90 N 6960.61 W 13530.67 3.33
15292.86 87.31 314.73 3999.21 11753.44 N 7027.06 W 13622.92 0.29
15386.28 89.94 313.19 4001.45 11818.26 N 7094.28 W 13715.07 3.26
15479.62 91.23 314.19 4000.49 11882.73 N 7161.77 W 13807.09 1.75
15573.03 91.38 313.29 3998.37 11947.29 N 7229.24 W 13899.19 0.98
15666.47 91.61 312.63 3995.93 12010.95 N 7297.60 W 13991.08 0.75
15759.82 90.39 309.72 3994.30 12072.39 N 7367.84 W 14082.32 3.38
15853.21 90.11 307.63 3993.89 12130.74 N 7440.75 W 14172.69 2.26
15946.54 90.39 308.49 3993.49 12188.28 N 7514.23 W 14262.74 0.97
16039.88 91.17 309.28 3992.21 12246.87 N 7586.88 W 14353.13 1.19
16133.33 93.30 312.94 3988.57 12308.25 N 7657.22 W 14444.39 4.53
16226.76 91.48 313.10 3984.67 12371.93 N 7725.47 W 14536.24 1.96
16320.17 91.49 312.56 3982.25 12435.41 N 7793.95 W 14628.06 0.58
16413.57 92.79 312.59 3978.76 12498.56 N 7862.68 W 14719.77 1.39
16507.00 91.96 313.42 3974.89 12562.23 N 7930.94 W 14811.62 1.26
16600.40 88.43 312.00 3974.58 12625.57 N 7999.56 W 14903.41 4.07
16693.65 90.23 311.33 3975.67 12687.55 N 8069.21 W 14994.74 2.06
16786.94 90.50 313.44 3975.07 12750.43 N 8138.11 W 15086.34 2.28
16880.41 90.29 312.43 3974.43 12814.10 N 8206.54 W 15178.28 1.10
16973.78 89.81 310.25 3974.35 12875.77 N 8276.64 W 15269.62 2.39
17067.10 91.54 311.88 3973.25 12937.06 N 8346.99 W 15360.81 2.55
17160.42 89.77 310.35 3972.18 12998.42 N 8417.29 W 15452.02 2.51
17253 79 90 70 310 17 3971 80 1 3 0 5 87 6N 8488 54 W 15542 99 10 1
17253.79 90.70 310.17 3971.80 13058.76 N 8488.54 W 15542.99 1.01
17347.17 91.92 311.18 3969.66 13119.60 N 8559.34 W 15634.08 1.70
17440.62 90.43 310.65 3967.75 13180.79 N 8629.94 W 15725.34 1.69
17534.10 90.26 311.91 3967.18 13242.46 N 8700.19 W 15816.77 1.36
17627.47 90.18 310.04 3966.82 13303.69 N 8770.68 W 15907.99 2.00
17720.91 90.86 310.81 3965.98 13364.27 N 8841.81 W 15999.08 1.10
17814.30 88.91 309.53 3966.16 13424.51 N 8913.17 W 16090.02 2.50
17907.75 88.68 309.81 3968.13 13484.15 N 8985.08 W 16180.83 0.39
18001.22 88.65 310.24 3970.31 13544.25 N 9056.64 W 16271.78 0.46
18094.74 88.75 311.31 3972.43 13605.31 N 9127.44 W 16363.05 1.15
18188.18 88.45 311.27 3974.71 13666.95 N 9197.63 W 16454.42 0.32
18281.29 88.52 311.57 3977.17 13728.53 N 9267.42 W 16545.51 0.33
18374.78 88.33 312.08 3979.74 13790.85 N 9337.06 W 16637.10 0.58
18467.94 88.62 313.43 3982.22 13854.07 N 9405.44 W 16728.65 1.48
18561.43 90.38 313.26 3983.04 13918.23 N 9473.43 W 16820.73 1.89
18655.02 90.29 313.02 3982.49 13982.23 N 9541.72 W 16912.86 0.27
18748.26 94.14 313.87 3978.89 14046.28 N 9609.35 W 17004.63 4.23
18841.57 93.98 312.37 3972.28 14109.90 N 9677.29 W 17096.25 1.61
18935.29 92.63 312.00 3966.88 14172.73 N 9746.61 W 17188.05 1.49
19028.71 90.29 311.09 3964.50 14234.66 N 9816.50 W 17279.48 2.69
19122.02 88.25 310.69 3965.69 14295.73 N 9887.03 W 17370.60 2.23
19215.50 87.94 308.57 3968.79 14355.32 N 9958.99 W 17461.38 2.29
19308.82 89.85 307.14 3970.59 14412.57 N 10032.65 W 17551.31 2.56
19402.31 91.59 309.79 3969.42 14470.72 N 10105.84 W 17641.67 3.39
19495.70 93.29 310.41 3965.44 14530.81 N 10177.20 W 17732.51 1.94
19589.16 93.37 310.35 3960.01 14591.26 N 10248.28 W 17823.46 0.11
19682.63 93.55 309.90 3954.37 14651.39 N 10319.62 W 17914.30 0.52
19776.06 93.58 310.04 3948.56 14711.29 N 10391.08 W 18005.04 0.15
19869.39 93.34 310.67 3942.93 14771.61 N 10462.08 W 18095.84 0.72
19962.80 92.15 310.24 3938.46 14832.15 N 10533.07 W 18186.81 1.35
20056.26 91.99 310.10 3935.08 14892.40 N 10604.44 W 18277.77 0.23
20149.70 92.05 310.03 3931.79 14952.50 N 10675.91 W 18368.68 0.10
20243.19 91.24 310.82 3929.10 15013.10 N 10747.05 W 18459.78 1.21
20336.43 89.95 310.84 3928.14 15074.06 N 10817.59 W 18550.82 1.38
20430.05 91.05 313.63 3927.32 15136.98 N 10886.90 W 18642.69 3.20
20523.21 92.06 313.82 3924.79 15201.34 N 10954.19 W 18734.52 1.10
20616.62 97.12 313.41 3917.32 15265.55 N 11021.58 W 18826.27 5.43
20710.01 100.42 312.33 3903.08 15328.34 N 11089.21 W 18917.04 3.71
20803.06 103.71 310.46 3883.63 15388.51 N 11157.46 W 19006.06 4.05
20896.35 107.76 309.73 3858.34 15446.33 N 11226.13 W 19093.47 4.41
20989.85 111.60 309.22 3826.86 15502.29 N 11294.07 W 19178.94 4.14
21083.23 113.60 308.50 3790.97 15556.38 N 11361.19 W 19262.43 2.26
21164.89 113.49 308.54 3758.35 15603.00 N 11419.76 W 19334.82 0.14
21230.00 113.49 308.54 3732.40 15640.21 N 11466.47 W 19392.56 0.00
CALCULATION BASED ON MINIMUM CURVATURE METHOD
SURVEY COORDINATES RELATIVE TO WELL SYSTEM REFERENCE POINT
TVD VALUES GIVEN RELATIVE TO DRILLING MEASUREMENT POINT
VERTICAL SECTION RELATIVE TO WELL HEAD
VERTICAL SECTION IS COMPUTED ALONG A DIRECTION OF 323.29 DEGREES (TRUE)
A TOTAL CORRECTION OF 20.15 DEG FROM MAGNETIC NORTH TO TRUE NORTH HAS BEEN APPLIED
HORIZONTAL DISPLACEMENT IS RELATIVE TO THE WELL HEAD.
HORIZONTAL DISPLACEMENT(CLOSURE) AT 21230.00 FEET
IS 19393.20 FEET ALONG 323.75 DEGREES (TRUE)
Date Printed:13 January 2013
0
1000
2000
3000
4000
5000
6000
7000
8000
9000
10000
11000
12000
13000
14000
15000
16000
17000
18000
19000
20000
21000
22000
0 5 10 15 20 25 30 35
Me
a
s
u
r
e
d
D
e
p
t
h
Rig Days
Prognosed
Actual
SP05-FN7
Days vs. Depth
18 Dec 2012
Reached surface TD
at 1610 hrs
3925' MD / 2457' TVD
30 Dec 2012
Run & Land 9 5/8
casing to 11990'
MD
09 Jan 2013
Reached production TD at
2215 hrs
21230' MD / 3733' TVD
20 Dec 2012
Run & Land 13 3/8"
casing to 3912' MD
23 Dec 2012
RIH, LOT 13.0 ppg
EMW, Drill ahead to
5292' MD
14 Dec 2012
SDL rig up unit and
gas equipment
16 Dec
2012
Pre Spud
meeting and
spud
03 Jan 2013
RIH, FIT 12.9 ppg
EMW, Drill ahead to
12400' MD
26 Dec 2012
Reached intermediate TD at
1030 hrs
12004' MD / 3996' TVD 06 Jan 2013
SP05-FN7 PB1 TD@
16666' MD
Surface Data Logging
After Action Review
Employee Name: Kori Jo Plowman Date: 19-Dec -2012
Well: SP05-FN7 Hole Section: Surface
What went as, or better than, planned:
The new version of Insite was installed, 7.4.2, on all of the computers. During the
surface section Insite ran smoothly. The Canrig cable, umbilical cord, and vortex line
were rigged up over-head as opposed to ground level minimizing pinches by the rig
settling and avoiding lost data. During surface we did not have any Canrig issues that we
had encountered on the last well.
Difficulties experienced:
With the new version of Insite, several things needed to be adjusted such as the
procedure for changing a run. Due to the rigs location over the new well our phone and
internet connection gave us problems for a few days. GCI seems to have fixed the
problem.
Recommendations:
Keep an eye out for any bugs and peculiarities in the new version of Insite.
Innovations and/or cost savings:
N/A
Surface Data Logging
After Action Review
Employee Name: Leigh Ann Rasher Date: 27-Dec -2012
Well: SP05-FN7 Hole Section: Intermediate
What went as, or better than, planned:
The new version of Insite 7.4.2 worked with no problems. We were able to change runs
as needed, making sure to shut down WITS and Insite on the IRIS computer and
restarting after the new run has been entered. We did not encounter any problems with
Canrig equipment.The vortex cooler is still reducing the amount of moisture seen in the
poly flow lines.
Difficulties experienced:
All remarks need to be entered on the Madi computer. The lithology cuttings descriptor
had to be changed to run based due to the lithology remarks not showing up on the log
when entered in under the well based folder.
Recommendations:
Be sure to follow protocol when beginning a new run and check all to see that all
descriptors were created for each new run. Make sure to blow back gas line any time the
pumps are turned off to avoid a frozen gas line.
Innovations and/or cost savings:
N/A
Surface Data Logging
After Action Review
Employee Name: Leigh Ann Rasher Date: 10-Jan-2013
Well: SP05-FN7 Hole Section: Production
What went as, or better than, planned:
Minim al problems were encountered with INSITE and the gas equipment.
Difficulties experienced:
We experienced a short outage of Gamma not writing after creating a sidetrack. The
times under the DGR folder were updating without any new depths or Gamma Ray
values. After about 400 feet of no new values Gamma started writing again once the
DGR Time & Date reached a new day (07-Jan-2013). We are not sure why Gamma
stopped writing but it may have been due to some of the values being deleted after the
well was sidetracked. Once the corrected Gamma is received from MWD it can imported
to fix any missing Gamma data on the log.
Near the end of the production section the gas exhaust line froze up after a shift change.
This caused the sample pressure on the THC to be pegged out until the exhaust line
was thawed out.
Recommendations:
During next well we will have several sidetracks so both mudloggers must be aware how
to properly create new well files for plug backs and be sure to talk to MWD to make sure
WITS is coming across correctly.
Make sure to blowback gas line to avoid freezing up and keep an eye on the gas
exhaust to ensure it does not completely freeze up again.
Innovations and/or cost savings:
During next rig up the gas exhaust line can be taped on top of the heat trace line to see
if it prevents the exhaust line from completely freezing.