Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout204-221CAUTION: This email originated from outside the State of Alaska mail system. Do not click links or open attachments unless you recognize the sender and know the content is safe. From:Wallace, Chris D (OGC) To:AOGCC Records (CED sponsored) Subject:FW: NOT OPERABLE: MPB-27 (PTD# 2042210) - Shut in for 4 year AOGCC MIT-IA Date:Thursday, July 31, 2025 11:32:35 AM From: Stephen Soroka <steve.soroka@hilcorp.com> Sent: Thursday, July 31, 2025 10:59 AM To: Wallace, Chris D (OGC) <chris.wallace@alaska.gov> Cc: Regg, James B (OGC) <jim.regg@alaska.gov>; Ryan Thompson <Ryan.Thompson@hilcorp.com> Subject: NOT OPERABLE: MPB-27 (PTD# 2042210) - Shut in for 4 year AOGCC MIT-IA Mr. Wallace – PWI well MPB-27 (PTD# 2042210) is currently shut in and will not be brought online for its scheduled 4-year MIT-IA due this month. The well is now classified as NOT OPERABLE and will remain shut in. A witnessed MIT-IA will be scheduled once the well is returned to injection. Please respond with any questions. Steve Soroka Hilcorp Alaska LLC Field Well Integrity Steve.Soroka@hilcorp.com P: (907) 830-8976 Alt: Chris Casey The information contained in this email message is confidential and may be legally privileged and is intended only for the use of theindividual or entity named above. If you are not an intended recipient or if you have received this message in error, you are herebynotified that any dissemination, distribution, or copy of this email is strictly prohibited. If you have received this email in error, pleaseimmediately notify us by return email or telephone if the sender's phone number is listed above, then promptly and permanently deletethis message. While all reasonable care has been taken to avoid the transmission of viruses, it is the responsibility of the recipient to ensure that the onward transmission, opening, or use of this message and any attachments will not adversely affect its systems or data. No responsibilityis accepted by the company in this regard and the recipient should carry out such virus and other checks as it considers appropriate. MEMORANDUM TO: Jim Regg P.I. Supervisor �� FROM: Matt Herrera Petroleum Inspector Well Name MILNE PT UNIT B-27 Insp Num: mitMFH210726111400 Rel Insp Num: NON -CONFIDENTIAL State of Alaska Alaska Oil and Gas Conservation Commission DATE: Monday, July 26, 2021 SUBJECT: Mechanical Integrity Tests Hilcorp Alaska, LLC B-27 MILNE PT UNIT B-27 Src: Inspector Reviewed By: P.I. Supry ;:r3r-- Comm API Well Number 50-029-23233-00-00 Inspector Name: Matt Herrera Permit Number: 204-221-0 Inspection Date: 7/25/2021 1 - Packer Depth Pretest Initial 15 Min 30 Min 45 Min 60 Min Well iB-27 Type Inj w - - Type Test, PTD 2042210 SPT ':TVD r . 4373 --I------ B-27 _ � Tubing 602 - 602 -Test pSl I 1500IA 234 1802 744 BBL Pumped: 14 , urned 1.4 OA 166 170 166 - BBL Ret Interval 4YRTST PIF p Notes: MIT -IA performed to 1800 PSI per Operator Monday, July 26, 2021 Page 1 of 1 • • MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission DATE: Wednesday,August 09,2017 TO: Jim Regg P.I.Supervisor }S e.C� 6 (-7 SUBJECT: Mechanical Integrity Tests HILCORP ALASKA LLC B-27 FROM: Guy Cook MILNE PT UNIT B-27 Petroleum Inspector Src: Inspector Reviewed By: P.I.Supry '16p NON-CONFIDENTIAL Comm Well Name MILNE PT UNIT B-27 API Well Number 50-029-23233-00-00 Inspector Name: Guy Cook Permit Number: 204-221-0 Inspection Date: 8/6/2017 Insp Num: mitGDC170806194923 Rel Insp Num: Packer Depth Pretest Initial 15 Min 30 Min 45 Min 60 Min Well B-27 ' Type Inj W •TVD 4373 - Tubing 1091 1092 - 1095 1092 • PTD 2042210 Type Test SPT Test psi 1500 - IA 268 1812 • 1764 - 1753 • BBL Pumped: 0.4 BBL Returned: 1 - OA 168 - 193 - 172 - 170 Interval 4YRTST P/F P Notes: MIT-IA. Used Little Red Services for testing. Wednesday,August 09,2017 Page 1 of 1 0 0 MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission DATE: Thursday,August 22,2013 TO: Jim Regg ? (-1(z4 1 P.I.Supervisor (3 Sege(' SUBJECT: Mechanical Integrity Tests BP EXPLORATION(ALASKA)INC B-27 FROM: Chuck Scheve MILNE PT UNIT SB B-27 Petroleum Inspector Src: Inspector Reviewed By: P.I.Supry jf_ NON-CONFIDENTIAL Comm Well Name MILNE PT UNIT SB B-27 API Well Number 50-029-23233-00-00 Inspector Name: Chuck Scheve Permit Number: 204-221-0 Inspection Date: 8/17/2013 Insp Num: mitCS130818071436 Rel Insp Num: Packer Depth Pretest Initial 15 Min 30 Min 45 Min 60 Min F— Well' B-27 . ,Type-n• 1 j ! w ]'I'VD 4373 I IA 5 2009 7I, 9697 1959 , I I —k 13TD I 2042210 - Type Test SPT Test psi i 1500 OA 1 115 1 149 I 135 I 117 k , 1 i Interval 4YRTST JP/F P '' I Tubing 1075 I 1075 - 1075 k 1075 • Notes: SCANNED DE -_, 2 32[113 Thursday,August 22,2013 Page 1 of 1 „+ww.ae't+.sr: `ei... _ r v x r • '' y m rwpY,;ca ., .. WTm.,. - _ r w.. re ••S v.4 a, .. e+ -n r ,. . , r ..n r • • bp BP Exploration (Alaska) Inc. •- Attn: Well Integrity Coordinator, PRB -20 �# Post Office Box 196612 Anchorage, Alaska 99519 -6612 December 30, 2011 FEB LdiL Mr. Tom Maunder Alaska Oil and Gas Conservation Commission ap 4 333 West 7 Avenue I� Anchorage, Alaska 99501 ,,�n Subject: Corrosion Inhibitor Treatments of MPB -Pad 1( Y 1i Dear Mr. Maunder, Enclosed please find multiple copies of a spreadsheet with a list of wells from MPB -Pad that were treated with corrosion inhibitor in the surface casing by conductor annulus. The corrosion inhibitor is engineered to prevent water from entering the annular space and causing external corrosion that could result in a surface casing leak to atmosphere. The attached spreadsheet represents the well name, API and PTD numbers, top of cement depth prior to filling and volumes of corrosion inhibitor used in each conductor. As per previous agreement with the AOGCC, this letter and spreadsheet serve as notification that the treatments took place and meet the requirements of form 10 -404, Report of Sundry Operations. If you require any additional information, please contact me or my alternate, Gerald Murphy, at 659 -5102. Sincerely, Mehreen Vazir BPXA, Well Integrity Coordinator • _ , • .' ,_ . , -. a -^^r 1 °'L:' -c^s. :.me, , ¶ e+rp _ •£„.<. , , v-1 Ax , ss °.t aiw n. „.y • I BP Exploration (Alaska) Inc. Surface Casing by Conductor Annulus Cement, Corrosion inhibitor, Sealant Top -off Report of Sundry Operations (10404) MPB -Pad 8/22/2011 Corrosion Initial top of Vol_ of cement Final top of Cement top off Corrosion inhibitor/ Well Name PTD # API # cement pumped cement date inhibitor sealant date ft bbls ft gal MPB-01 1800750 50029204900000 Sealed coductor NA NA NA NA NA MPB-02 1811420 50029206620000 40 NA Need tob job MPB-03 1820560 50029207320000 Sealed coductor NA NA NA NA NA MPB -04A 1821000 50029207480100 Sealed coductor NA NA NA NA NA MPB-05A 1851480 50029207720100 Sealed coductor NA NA NA NA NA MPB-06 1850130 50029212760000 Tanko conductor NA NA NA NA NA MPB-07 1850620 50029213240000 Sealed coductor NA NA NA NA NA MPB-08 1850630 50029213250000 Tanko conductor NA NA NA NA NA MPB -09 1850340 50029212970000 Tanko conductor NA NA NA NA NA MPB-10 1850170 50029212800000 Tanko conductor NA NA NA NA NA MPB-11 1850430 50029213050000 Tanko conductor NA NA NA NA NA MPB-12 1850800 50029213380000 Tanko conductor NA NA NA NA NA MPB-13 1850930 50029213480000 Tanko conductor NA NA NA NA NA MPB-14 1851120 50029213660000 Tanko conductor NA NA NA NA NA MPB-15 1851210 50029213740000 Tanko conductor NA NA NA NA NA MPB-16 1851490 50029213840000 Tanko conductor NA NA NA NA NA MPB -17 1852090 50029214340000 Tanko conductor NA NA NA NA NA MPB -18 1852290 50029214500000 Tanko conductor NA NA NA NA NA MPB-19 1852300 50029214510000 Tanko conductor NA NA NA NA NA MPB-20 1860050 50029215240000 Tanko conductor NA NA NA NA NA MPB -21 1860230 50029215350000 Tanko conductor NA NA NA NA NA MPB -22 1853020 50029215090000 Tanko conductor NA NA NA NA NA MPB -23 1890160 50029219150000 Sealed coductor NA NA NA NA NA MPB-24 1960090 50029226420000 5 NA 5 NA 35.7 8/22/2011 MPB-25 1972330 50029228410000 3.8 NA 3.8 NA 25.5 8/22/2011 > MPB-27 2042210 50029232330000 1.6 NA 1.6 NA 15.3 8/22/2011 MPB-50 2042520 50029232400000 2.1 NA 2.1 NA 8.5 8/22/2011 ~ MEMORANDUM TO: Jim Regg ~~> ~~ ~~ ~ P.I. Supervisor ~~ FROM: John Crisp Petroleum Inspector ~ State of Alaska Alaska Oil and Gas Conservation Commission DATE: Monday, August 24, 2009 SUBJECT: Mechanical Integrity Tests BP EXPLORATION (ALASKA) INC B-2~ MII,NE PT LJNIT SB B-27 Src: Inspector NON-CONFIDENTIAL Reviewed By: P.I. Suprv ~ Comm Well Name: MILNE PT L1NIT SB B-27 Insp Num: mitJCr09082ot6o85o Rel Insp Num: API Well Number: 50-029-23233-00-00 Permit Number: 204-221-o Inspector Name: John Crisp Inspection Date: 8/20/2009 Packer Depth Pretest Initial 15 Min. 30 Min. 45 Min. 60 Min. Well B~Z~ Type Inj. W ~j'~ 4372 jA 980 2020 / 2000 1990 - P.T.D 2042210 TypeTest SPT Test psi 1500 QA 200 210 200 190 Irit01'Va~ 4YRTST P~ P i Tllblrig 1150 ll50 ll50 1150 NOtes' ~9 bbls diesel pumped for test. Duel injector 1150 psi average between the 2 strings, short & long. ~ .. v ~,. ~:~~...~. [G ~' jr " ' ' ~~.t Monday, August 24, 2009 Page 1 of 1 • • ~«=.. MICROFILMED 03/01 /2008 DO NOT PLACE ANY NEW MATERIAL UNDER THIS PAGE F:tLaserFiche\CvrPgs_Inserts\A~icrafilm Mazke~:doc / J a-- ~ö ~ 7 DATA SUBMITTAL COMPLIANCE REPORT 12/11/2006 Permit to Drill 2042210 Well Name/No. MILNE PT UNIT SB B-27 Operator BP EXPLORATION (ALASKA) INC >tJ......t- ~ rJ~,.J ~ '1 API No. 50-029-23233-00-00 MD 8480--" TVD 4545 _" Completion Date 12/1/2004 / Completion Status 1-01l REQUIRED INFORMATION Mud log No Samples No DATA INFORMATION Types Electric or Other Logs Run: MWD, GR, IFR/CASANDRA, RES, ASI, SCMT, eel Well Log Information: Log/ Electr Data Digital Dataset Type Med/Frmt Number Name l2 D Asc Directional Survey D Asc Directional Survey /og Cement Evaluation ~ D Lis 13167 Induction/Resistivity tØ 13167 LIS Verification C . 2¡; f 1..\ ~ 13531 Induction/Resistivity U C Pdf 13531 Induction/Resistivity Log Log Run Scale Media No 5 Col Well Cores/Samples Information: Name Interval Start Stop Received Sent ADDITIONAL INFORMATION Well Cored? Y (0 Chips Received? Y / N Daily History Received? Formation Tops Analysis Received? ~. Current Status 2WINJ ~~CY ) Directional surve~ (data taken from logs Portion of Master Well Data Maint Interval OHI . Start Stop CH Received Comments 0 8480 1/27/2005 IIFR 0 8480 1/27/2005 MWD 4980 7264 Case 2/28/2005 cement map & bond log/scmUgr/ccl 60 8422 Open 6/10/2005 MWD: GRlEWR4/ROP 60 8422 6/10/2005 MWD: GRlEWR4/ROP 114 8480 Open 2/22/2006 ROP Rate of Penetration DGR Dual Gamma Ray EWR Electromagnetic Wave Resistivity Horizontal Presentation 114 8480 Open 2/22/2006 ROP Rate of Penetration DGR Dual Gamma Ray EWR Electromagnetic Wave Resistivity Horizontal . Presentation ~ Sample Set Number Comments ~N (Y/N DATA SUBMITTAL COMPLIANCE REPORT 12/11/2006 Permit to Drill 2042210 Well Name/No. MILNE PT UNIT SB B-27 Operator BP EXPLORATION (ALASKA) INC MD 8480 TVD 4545 Completion Date 12/1/2004 Completion Status 1-01L Current Status 2WINJ Comments: Compliance Reviewed By: k Date: API No. 50-029-23233-00-00 UIC Y 3 J~.L~7 . . . . o WELL LOG TRANSMITTAL To: State of Alaska Alaska Oil and Gas Conservation Comm. Attn.: Librarian 333 West ih Ave., Suite 100 Anchorage, Alaska 99501 February 16, 2006 135~ I RE: MWD Formation Evaluation Logs MPB-27, The technical data listed below is being submitted herewith. Please address any problems or concerns to the attention of: Rob Kalish, Sperry Drilling Services, 6900 Arctic Blvd., Anchorage, AK 99518 907-273-3500 MPB-27: LAS Data & Digital Log Images: 50-029-23233-00 me) J)OJr .~1) r 1 CD Rom ~QJ-lr) 1} ~9'lo{P _ STATE OF ALASKA . ALASKA1II!!JfL AND GAS CONSERVATION COMrJfP!SION WELL COMPLETION OR RECOMPLETION REPnRT AND LOG '1 Dw t¡ -'2f)~ ' 1bq.zP·tl 'iT - Revision: /71' ~ . 1a. Well Status: ~il 0 GaiÆ.p~g~ 0 Abandoned 0 Suspended "'A~ I'f"I"r .ß.f!!..J O¡vJ- 20MC 25.105 20MC 25.110 o GINJ IR1VíÑJ 0 W SPL No. of Completions One Other 2. Operator Name: 5. Date Comp., Susp., or Aband. BP Exploration (Alaska) Inc. 12/1/2004 3. Address: 6. Date Spudded P.O. Box 196612, Anchorage, Alaska 99519-6612 11/20/2004 4a. Location of Well (Governmental Section): 7. Date T.D. Reached Surface: 11/28/2004 5249' NSL, 4295' WEL, SEC. 19, T13N, R11E UM Top of Productive Horizon: 8. KB Elevation (ft): 1643' NSL, 1167' WEL, SEC. 19, T13N, R11E, UM (OA) 56.90' Total Depth: 9. Plug Back Depth (MD+ TVD) 954' NSL, 1760' WEL SEC. 19, T13N, R11E, UM (OA) 8480 + 4545 4b. Location of Well (State Base Plane Coordinates): 10. Total Depth (MD+TVD) Surface: x- 571997 y- 6023092 Zone- ASP4 8480 + 4545 TPI: x- 575175 y- 6019518 Zone- ASP4 11. DepthwhereSSSVset Total Depth: x- 574591 y- 6018823 Zone- ASP4 N/A MD 19. Water depth, if offshore 18. Directional Survey 0 Yes !HI No N/A MSL SIZE Long 2-3/8", 4.7#, L-80/TCII Short 2-3/8",4.7#, L-80/TCII 25. DEPTH INTERVAL (MO) AMOUNT & KIND OF MATERIAL USED Freeze Protected with 88 Bbls of Diesel 21. Logs Run: MWD , GR , IFRlCASANDRA , RES, ABI , SCMT , CCL CASING, LINER AND CEMENTING RECORD SETTING DEP1'I-IMD SETTINGDeP"tI-\WD BOTTOM ToP BOTTOM 114' 35' 114' 3593' 35' 2863' 7614' 33' 4520' 8480' 4490' 4545' 22. 20" 92# 40# 26# 12.6# H-40 L-80 L-80 L-80 35' 35' 33' 7471' 42" 9-5/8" 12-1/4" 8-3/4" 6-1/8" 7" 4-1/2" 23. Perforations open to Production (MD + TVD of To,e and Bottom Interval, Size and Number; if none, state' none"): 4-112" Slotted Liner 2-7/8" & 4-1/2" Gun Diameter MD TVD MD TVD 7606' - 8435' 4520' - 4537' 2-7/8",6SPF 2-7/8",6SPF (, 09/01/0!f; Staft(~ction /' 1 b. Well Class: o Development 0 ExplorätOry o Stratigraphic !HI Service 12. Permit to DrUI Number 204-221 ,?i 305-076 13. API Number 50- 029-23233-00-00 14. Well Name and Number: MPB-27i 15. Field 1 Pool(s): Milne Point Unit / Schrader Bluff Ft Ft 16. Property Designation: ADL 047438 17. Land Use Permit: 20. Thickness of Permafrost 1800' (Approx.) 260 sx Arctic Set (Approx.) 443 sx AS Lite, 372 sx Class 'G' 370 sx Class 'G' Uncemented Slotted Liner DEPTH SET (MD) 7507' 7180' PACKER SET (MD) 7142' 7298' - 7308' 4-1/2",5SPF 4428' - 4432' 4-1/2", 5SPF 7298' - 7313' 4428' - 4433' 7322' - 7352' 4437' - 4447' 26. Date First Production: August 1 , 2005 Date of Test Hours Tested PRODUCTION FOR TEST PERIOD .. Flow Tubing Casing Pressure CALCULATED ....... Press. 24-HoUR RATE""" PRODUCTION TEST Method of Operation (Flowing, Gas Lift, etc.): Water Injection I Oll-BSl GAs-McF WATER-Bsl Oll-Bsl GAs-McF WATER-Bsl CHOKE SIZE I GAS-Oil RATIO Oil GRAVITY-API (CORR) 27. CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water (attach separate sheet, if necessary). Submit core chips; if none, state "none". None RBDMS BFl SEP 2 0 2005 Form 10-407 Revised 12/2003 CONTINUED ON REVERSE SIDE ORIGiNAL 28. e GEOLOGIC MARKERS 29. ~ORMATION TESTS NAME MD TVD Include and briefly summarize test results. List intervals tested, and attach detailed supporting data as necessary. If no tests were conducted, state "None". MA SBF2-NA SBF21 SBF24-MF SBF12 SBE4-NC SBE41 SBE3-ND SBE2-NE SBE1-NF TSBD-OA TSBC 6681' 7178' 7195' 7212' 7286' 7295' 7314' 7323' 7371' 7477' 7565' 8394' 4174' 4386' 4392' 4398' 4424' 4427' 4434' 4437' 4454' 4492' 4514' 4531' None 30. List of Attachments: 31. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed Title Technical Assistant Date rjq - ()/(/,(,:[\ ~ MPB-27i Well Number 204-221 305-076 Permit NO.1 Approval No. INSTRUCTIONS GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Prepared By Name/Number: Drilling Engineer: Sondra Stewman, 564-4750 Jim Smith, 564-5773 ITEM 1a: Classification of Service Wells: Gas Injection, Water Injection, Water-Altemating-Gas Injection, Salt Water Disposal, Water Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. ITEM 4b: TPI (Top of Producing Interval). ITEM 8: The Kelly Bushing elevation in feet above mean low low water. Use same as reference for depth measurements given in other spaces on this form and in any attachments. ITEM 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00). ITEM 20: True vertical thickness. ITEM 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. ITEM 23: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). ITEM 26: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, or Other (explain). ITEM 27: If no cores taken, indicate "None". ITEM 29: List all test information. If none, state "None". Form 10-407 Revised 12/2003 Submit Original Only MEMORANDUM · TO: Jim Regg '":":) _ I j P.I. Supervisor . \'<1~ 1, z,{o~ FROM: Lou Grimaldi Petroleum Inspector Well Name: MILNE PT UNIT SB B-27 Insp Num: mitLG050907073745 Rei Insp Num Packer . State of Alaska Alaska Oil and Gas Conservation Commission DATE: Monday, September 12,2005 SUBJECT: Mechanical Integrity Tests BP EXPLORATION (ALASKA) INC B-27 MILNE PT UNIT SB B-27 Src: Inspector NON-CONFIDENTIAL API Well Number 50-029-23233-00-00 Permit Number: 204-221-0 ~" ~ '1-" Reviewed By: P.I. Suprv ~ Comm Inspector Name: Lou Grimaldi Inspection Date: 9/5/2005 ; I Well B-27 ,Type Inj. : W TVD P.T. 2042210 ITypeTest I SPT i Test psi Interval INITAL P/F P Notes Dual string completion, Long string entered. Short string pressure was 1090 throughout test. Depth Pretest Initial 15 Min. 30 Min. 45 Min. 60 Min. 4372 IA 550 1600 1560 1550 1093 OA 230 270 250 250 Tubing 1130 1140 1140 1140 Monday, September 12,2005 Page 1 of 1 · _ __ STATE OF ALASKARE C E···· , ALAS~ANDGASCONSERVATIONC.ISSION. . ,IVED REPORT OF SUNDRY WELL OPERATIONSuG 0 g 2005 1. Operations Performed: o Abandon o Alter Casing o Change Approved Program 2. Operator Name: BP Exploration (Alaska) Inc. 3. Address: P.O. Box 196612, Anchorage, Alaska 7. KB Elevation (ft): 8. Property Designation: ADL 047438 11. Present well condition summary Total depth: measured Effective depth: true vertical measured true vertical Casing Structural Conductor Surface Intermediate Production Liner Length Perforation Depth MD (ft): Perforation Depth TVD (ft): o Suspend o Repair Well 181 Pull Tubing 56.90' 8480 4545 8480 4545 79' 3558' 7581' 1009' 99519-6612 7298' - 7352' 4428' - 4447' Tubing Size (size, grade, and measured depth): Packers and SSSV (type and measured depth): 12. Stimulation or cement squeeze summary: Intervals treated (measured): NIA o Operation Shutdown o Plug Perforations o Perforate New Pool AJask» Oil &. Gas Con$, Cornmissiört conmfb~R~~blnjector < .... .q 181 Perforate o Stimulate o Waiver 181 Other o Re-Enter Suspended Well o Time Extension 4. Current Well Class: o Development 0 Exploratory o Stratigraphic 181 Service 5. Permit To Drill Number: 204-221 6. API Number: 50-029-23233-00-00 9. Well Name and Number: MPB-27i 10. Field 1 Pool(s): Milne Point Unit 1 Schrader Bluff feet feet Plugs (measured) 7400' feet Junk (measured) NIA feet Size MD TVD Burst Collapse 20" 114' 114' 1530 520 9-5/8" 3593' 2863' 5750 3090 7" 7614' 4520' 7240 5410 4-1/2" 7471' - 8480' 4490' - 4545' 8430 7500 - \c:>~\().\tCJ ~~~~~~~ .~ç- S\--.o~ c::,\-~\('o..~ /fL.~ __ <6{~-ò ~ Long - 2-3/8",4.7# L-80/TCII 7507' Short - 2-3/8", 4.7# L-80/TCII 7180' Baker 'GT' Retrievable Packer 7142' \....eNS s~~:> <'~'\.)\~c,. ~\C)\\~\ \"''\.~Ç- k2-~/~_oç Treatment description including volumes used and final pressure: RBDMS 8Fl AUG 0 9 2005 13. Prior to well operation: Subsequent to operation: 14. Attachments: Oil-Bbl Representative Daily Average Production or Injection Data Gas-Met Water-Bbl CasinQ Pressure TubinQ Pressure 15. Well Class after proposed work: o Exploratory 0 Development 181 Service 16. Well Status after proposed work: j\''W1 ~ o Oil 0 Gas 0 WAG 0 GINJ 181 W~J 0 WDSPL 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. I Sundry Number or N/A if C.O. Exempt: Contact Jim Smith, 564-5773 305-076 o Copies of Logs and Surveys run 181 Daily Report of Well Operations 181 Well Schematic Diagram Printed Name Sondra Stewman Si9~-LÛJ"'- Form 10-404 Revised 04/2004 Title Technical Assistant Phone Prepared By Name/Number: Sondra Stewman, 564-4750 Submit Original Only 564-4750 Date O~~O~-(ì') Tree: 2-3/8" Dual ca.5M Wellhead: FMC 11" 5M, Gen. 5 wI 11" x 2-3/8" C Tbg. Hgr. w/2-3/8" TC-II Top & Btm. 2" CIW 'H' BPV profile 20" 92 ppf, H-40 I 80' 2-3/8" HES X-Nipple ( 1.875" id) I 2,883' I 95/8",40 ppf, L-80 Btrc. I 3,593' ,. KOP @ 300' Max. hole angle = 64 to 70 deg. f/2900' to 7,500' Hole angle through perfs = 90 deg. 7" 26 ppf, L-80, btc production casing ( drift ID = 6.151 ", cap. = 0.0383 bpf) 2-3/8",4.7 #/ft L-80, TC-II tubing (drift id = 1.901, cap.=.00387 bpf) 7" "RA Tag" Installed in coupling Short Joint 7,115 - 7,125' 2-3/8" HES X-Nipple ( 1.875" id ) 7,147' I 2-3/8" HES XN-Nipple (1.875 Pk9) 7,168' I (No-Go 1.791" id) 2-3/8" Baker Hydro-Trip sub w/ out sub seat I 7,175' I 2-3/8" Tail Pipe I 7,180' I Perforation Summary Ref log: SCMT Log dated 11/30/04 Size SPF Interval (T\jP) 2-7/8" 6 7,298'-7,308' 4428' - 4432' 4.5" 5 7,298' -7,313' 4428' - 4433' 4.5" 5 7,322' -7,352' 4437' - 4447' Weatherford Float Collar I 7,527' Weatherford Float Shoe I 7,614' DATE 12/07/04 07/04/05 REV. BY MDO MDO COMMENTS Drilled and completed by Doyon-14 Dual Completion Nabors 4-ES MILNE POINT UNIT WELL MPB-27 API NO: 50-029-23233-00 MPU B-27i ) ¡" ~ . rig.. KB. elev. ':.. 57.3~' Ig. GL. .el~V.-f3.3 ig. DF. el~v. = .56.9' 2-3/8" HES X-Nipple ( 1.875" id) I 2,867' I RECEr lED AUG 0 8 ~005 Alaska Oil & Gas Cor s. CQmmi$$/¡:;n AnchoTa Ie 2-3/8" HES X-Nipple ( 1.875" id) I 7,129' I Baker "GT' Retrievable Packer 7,142' I ~ 2-3/8" HES XN-Nipple (1.875 pkg) 7,456' I ËI (No-Go1.791"id) ~ 2-3/8" Baker Hydro-Trip sub 1 7,461' I ~ Baker No-Go Locator sub I 7,474' I 80-40 Seal sub 17,475' - 7,5071 Baker Tie back sleeve 7,471' 7" x 5" Baker ZXP Liner top 7,483' Baker HMC liner Hgr. w/ dg slips 7,490' Baker 80-40 Seal bore ex!. 5" 7,498' - 7,517' ~ HES 4.5" "V" Float shoe 8480' t 20 joints of slotted liner 7,605' - 8,425' BP EXPLORATION (AK) legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: MPB-27 MPB-27 WORKOVER NABORS ALASKA DRilLING I NABORS 4ES Start: 6/30/2005 Rig Release: 7/8/2005 Rig Number: , "II J¡ILH, Anchorage Spud Date: 11/20/2004 End: 7/8/2005 PJSM. Scope down & layover derrick. Rig down rig components. Prep fo rmove. PJSM. Move rig components from MP F pad to MP B pad. 10 mile move. Continue moving rig & rig components from MP F pad to MP B pad. PJSM. Spot rig over well. Raise & scope up derrick. Rig accepted @ 04:00 hrs, 07/01/2005. PJSM. Rig up lines to tree & tiger tank. Take on heated seawater. Install secondary annulus valve. Pull BPV. SITP = 0 psi, SICP = 0 psi, OIA = 210 psi. PJSM. Pressure test lines to 3500 psi, OK. PJSM on well kill & over view of rig operations. Line up to pump heaqted seawater down tubing, taking returns thru choke to tiger tank. Attempt to pump down tubing, pressuring up immediately. Double check all valves, OK. Attempt to pump down IIA, pressuring up also, as with tubing. DPRB DECOMP PJSM. Continue attempting to establish circulation while rigging up Hot Oil. Rig up Hot Oil, test lines to 5000 psi, OK. Attempt to circulate hot diesel, (90 deg), down tubing, 5000 psi max pressure. Rig pump lined up on itA, pressuring up to 3500 psi max pressure. Alternate pumping on one & bleeding down the other wI various combinations there of, all to no avail. Ice andlor thick oil blockage suspected. PJSM. P/U lubricator, set BPV & rig down Hot Oil. PJSM. Rig down rig components, scope down & layover derrick. Move rig components off to the side, in preparation for rigging up coil tubing unit. CTU Unit #4 spotted R/U, tested I Tag obstruction at 976' and jet slushy ice to 1350' I Circulate out well with 350 bbls of seawater RDMO with Coil Well prep Set BPV Move rig over location PJSM. Nipple up secondary inner annulus valve. Rig up surface lines & test @ 250 1 3500 psi, OK. Pick up lubricator & pull BPV. SITP = 0 psi, SICP = 0 psi, OIA = 200 psi. PJSM regarding well killing operations & overview of workover ops. Line up & curculate seawater @ 5 bpm I 700 psi, taking oily seawater returns thru choke & to tiger tank. W /115 bbls pumped, shut well in & bullhead 10 bbls into formation @ 2 bpm 11450 psi. Resume circulating seawater around @ 5 bpm 11400,25 bbls. Bleed all pressure & shut in well. Monitor SITP. Zero pressure build up in 45 minutes. Open well & resume pumping seawater around to clean seawater returns. Moniotr well, well dead. PJSM. Set two way check valve & test, OK. NID wellhead & HCR valve. PJSM. N/U DSA, test spool & 13518" x 5M BOPE. N/U secondary annulus valve. PJSM. Conduct full test on BOPE. Witnessing of test waived by AOGCC State Rep Chuck Scheve. Test witnessed by Nabors Tool Pusher Gene Sweatt and BP Company Man Paul Haynes. No failures. UD test joint. P/U lubricator & pull two 6/30/2005 16:00 - 18:00 2.00 RIGD P PRE 18:00 - 00:00 6.00 MOB P PRE 00:00 - 02:00 2.00 MOB P PRE 02:00 - 04:00 2.00 RIGU P PRE 04:00 - 07:00 3.00 KILL P DECOMP 07:00 - 07:30 0.50 KILL P DECOMP 07:30 - 08:30 1.00 KILL P DECOMP 7/1/2005 08:30 -12:30 4.00 KILL N 12:30 - 13:00 0.50 KILL N DPRB DECOMP 13:00 - 16:30 3.50 RIGD N DPRB DECOMP 16:30 - 00:00 7.50 CLEAN N DPRB DECOMP 7/2/2005 00:00 - 02:30 2.50 RIGD N DPRB DECOMP 02:30 - 06:00 3.50 RIGU N DPRB DECOMP 06:00 - 07:30 1.50 KILL P DECOMP 07:30 - 09:00 1.50 KILL P DECOMP 09:00 - 09:30 0.50 KILL P DECOMP 09:30 - 10:30 1.00 KILL P DECOMP 10:30 - 12:00 1.50 WHSUR P DECOMP 12:00 - 13:30 1.50 BOPSUF P DECOMP 13:30 - 17:30 4.00 BOPSUPP DECOMP Printed: 7/11/2005 10:18:12 AM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: MPB-27 MPB-27 WORKOVER NABORS ALASKA DRILLING I NABORS 4ES Start: 6/30/2005 Rig Release: 7/8/2005 Rig Number: I 8. GF"~ Co f" a" . ns. l.ommi¡;sío[¡ ~iJíDØe: 11/20/2004 End: 7/8/2005 71212005 13:30 - 17:30 4.00 BOPSUP P DECOMP way check valve. 17:30 - 21 :00 3.50 PULL P DECOMP Reverse Circulate hot seawater around. Monitor well, build up 20 psi, flow 2 bbls back in 5 min Monitor no build up, open & watch slight flow. Weight up to 8.8 ppg 21 :00 - 23:00 2.00 KILL P DECOMP Circulate 8.8 ppg seawater full volume I Monitor well, fluid dropping slowly. 23:00 - 00:00 1.00 PULL P DECOMP PJSM Pick up pulling Jt. Tie into hanger, back out LDs I Pull hanger to floor. PIU wieght 80K max, drop to 70K I Lay down Pulling Jt. and hanger. 7/3/2005 00:00 - 00:30 0.50 PULL P DECOMP R/U fill line I Pump 7 bbls to fill weill Watch well fluid dropping slowly I Est at 7 bbls in 1-1/2 hrs Resume pull and lay down completon string. 00:30 - 06:00 5.50 PULL P DECOMP Pull and lay down 4.5" 12.6 # L-80 IBT - M Tbg pumpimg single diplacement of Tbg watching hole. At 75 Jts out did double displacement to check hole fill, "Good" Back to single displacement. 06:00 - 10:00 4.00 PULL P DECOMP PJSM. Continue to POOH w/4 1/2" completion string. 10:00 - 11 :30 1.50 PULL P DECOMP PJSM. Break out & lay down Baker seal assembly. Clear Iclean rig floor. 11 :30 - 13:30 2.00 PRFADD P DECOMP PJSM. NID flow nipple, nipple up shooting flange. 13:30 - 16:00 2.50 PRFADD P DECOMP PJSM wI Schlumberger. Rig up lubricator & Eline BOPE. Pick up gun assembly including 30' of 41/2",5 spf powerjet, CCUgamma, rollers. 16:00 - 20:00 4.00 PRFADD P DECOMP RIH wI perforating assembly, 70' I minute max speed. Correlate with SCMT/GRlCCL Log 30-Nov-2004 from 7400' up to 7100' Tie in to RA collar at 7115.1 Log in to depth stop at 7310' + 12' to top shot at 7322' bottom shot at 7352' I Fire guns fair indication I Log out I POOH 20:00 - 20:30 0.50 PRFADD P DECOMP Safety meeting held with all rig personnel night crew, Schlumberger, and Co. man for next interval of perforations 20:30 - 00:00 3.50 PRFADD P DECOMP RlU 4.5" Csg. gun 5-spf power jet 4505 HMX RIH to 7420' and correlate up to 7115' RA tag. Log into CCL depth 7281.8' + 16.2' to top shot at 7298' bottom shot at 7313' I Fire guns good indication I Log out 7/4/2005 00:00 - 01 :30 1.50 PRFADD P DECOMP POOH with ElL after perforating 01 :30 - 03:00 1.50 PRFADD P DECOMP PJSM RID Schlumberger I Shooting flange. 03:00 - 04:30 1 .50 CLEAN P DECOMP Make up flow nipple, install wear bushing 04:30 - 05:00 0.50 CLEAN P DECOMP Clear rig floor ready to run drill pipe 05:00 - 06:00 1.00 CLEAN P DECOMP Pick BHA clean out assembly, 2-7/8" mule shoe, 1 Jt. 2-7/8" DP, sub, 2 X boot baskets, Csg. scraper, Bit sub, Oil jar, 3 x 4 3/4" drill collar 06:00 - 11 :30 5.50 CLEAN P DECOMP PJSM. RIH w/3 1/2" DP from pipe shed. With 231 jts in the hole, up wt = 81 K, down wt = 57K. Make up headpin on jt #232. Wash down @ 3 bpm 1500 psi to 7518', (4' in on # 233). No go out to verify. 11 :30 - 12:30 1.00 CLEAN P DECOMP PJSM. Pick up 5' & circulate (2) bottoms up @ 5 bpm 11400 psi. Load pipe shed w/2 318" TCII tubing. Very small quantinty of oil wI gas breaking out wI bottoms up. Monitor well, well on slight vacuum. 12:30 - 18:00 5.50 CLEAN P DECOMP PJSM. POOH & UD DP. 18:00 - 19:30 1.50 CLEAN P DECOMP Clean and lay down BHA 19:30 - 21 :00 1.50 CLEAN P DECOMP Clean rig floor, RID DP equip., Pull wear ring 21 :00 - 23:00 2.00 BOPSUF P DECOMP Install test plug, change out rams to 2-3/8", Test 250 psi 13500 Printed: 7/11/2005 10:18:12AM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: MPB-27 MPB-27 WORKOVER NABORS ALASKA DRILLING I NABORS 4ES Start: 6/30/2005 Rig Release: 7/8/2005 Rig Number: Spud Date: 11/20/2004 End: 7/8/2005 7/4/2005 21 :00 - 23:00 2.00 BOPSUF P DECOMP psi, RID test equip. 23:00 - 00:00 1.00 RIGU P RUNCMP PJSM Rig up 2-3/8" running equip 7/5/2005 00:00 - 08:30 8.50 RUNCOMP RUNCMP RIH 2-3/8" TC II Tbg. to make up stands for racking back. Setting up 1.905" drift run procedure practice. Torquing connections to 1200 ft Ilbs. Ran 239 jts. (Long String) 08:30 - 11 :00 2.50 RUNCOMP RUNCMP PJSM. Circulate bottoms up @ 5 bpm I 2450 psi. 11 :00 - 15:00 4.00 RUNCOMP RUNCMP TOH with 2-3/8" TC II Tbg. and rack back in Stds = 78 stds + Single. 15:00 - 00:00 9.00 RUNCOMP RUNCMP RIH 2-318" TC II Tbg. to make stands for racking back. Torque connections to 1200 ft Ilbs Ran 226 Jts. (Short String) 7/6/2005 00:00 - 01 :30 1.50 RUNCOMP RUNCMP Circulate well from 7130' and spotted EP mud lube up to 5000' 01 :30 - 06:00 4.50 RUNCOMP RUNCMP PJSM POH with 2-3/8" TC II Tbg and rack back in Stds = 75 Stds + single for SS completion run 06:00 - 08:00 2.00 BOPSUF P RUNCMP Change out 2 3/8" single Pipe Rams to 2 3/8" dual Pipe rams. Test at 250/3500 psi. Rig down test equipment. Drain BOP stack. 08:00 - 08:30 0.50 RUNCOMP RUNCMP Rig up 2 3/8" dual string handling equipment. 08:30 - 11 :00 2.50 RUNCOMP RUNCMP Make-up Split Moon Dual Hanger on two Landing Jts. Attempt to "dry" land Hanger to verify measurements. However, we aborted "dry run" as we were unable to completly land hanger with no weight string weight hanging below Hanger. Lay down same. 11 :00 - 11 :30 0.50 RUNCOMP RUNCMP PJSM with All. 11 :30 - 12:00 0.50 RUNCOMP RUNCMP Make final Completion Jewelry inspection. Finish rigging-up handling equipment. 12:00 - 14:00 2.00 RUNCOMP RUNCMP Pick-up Seal Assembly, Nipple Assembly (Hydro-Trip sub wlBall Seat and XN-Nipple), 9 Jts of 2 3/8" 4/7 Ib/ft, L-80 TCII Tbg Long String). Pick-up Baker GT Retrievable Dual Packer wI Tail Pipe for the Short String as follows: Hydro-Trip Sub wINo Ball Seat, XN-Nipple with RHC-M Plug installed. 14:00 - 00:00 10.00 RUNCOMP RUNCMP Install 1.875" HES "X" Nipples in US & S/S. TIH wI 2-3/8" 4.6# L-80 TC II Tbg by Stds making 1.904 drift run each Std. AT 45 Stds in install 1.875" HES "X" Nipples in US & SIS Continue running completion in Stds. 7/7/2005 00:00 - 06:00 6.00 RUNCOMP RUNCMP Continue running 2-3/8" dual completion keeping wieght balanced on strings; torque at 1200 ft lib added 1 pup in Short string at Jt. 171 to equal spacing 06:00 - 07:00 1.00 RUNCOMP RUNCMP Finish running Dual String Completion. PUW = 56K. SOW = 32K. Bring pump on line at 1.5 bpm/300 psi. Enter into Seal Bore Extention with Seal Assembly and pressure increased to 400 psi. Continue in to No-Go Sub. Space out both Strings. 07:00 - 08:30 1.50 RUNCOMP RUNCMP Make-up Split Moon Hanger. Make-up Landing Jts. Land Tubing Strings. Verify alignment. RILDS. Test Hanger. Good. 08:30 - 09:30 1.00 RUNCOMP RUNCMP Lay down Landing Jts. Rig down Dual String handling equipment. 09:30 - 10:00 0.50 RUNCOMP RUNCMP Set and test TWCs. 10:00 - 11 :00 1.00 BOPSUF P RUNCMP Nipple down BOP Stack and 11" DSA. 11 :00 - 14:30 3.50 BOPSUF P RUNCMP Nipple up Adaptor Flange. Dual String Injection Tree. Test at 5,000 psi. Good. 14:30 - 15:30 1.00 BOPSUF P RUNCMP Pick-up Lubricator and pull TWCs. Lay down same. 15:30 - 16:00 0.50 BOPSUF P RUNCMP Rig-up lines to Tree. Test lines at 5,000 psi 16:00 - 18:00 2.00 CONDHL P OTHCMP Reverse Circulate in with 200 bbls of warm Sea Water Printed: 7/11/2005 10:18:12 AM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: MPB-27 MPB-27 WORKOVER NABORS ALASKA DRILLING I NABORS 4ES Start: 6/30/2005 Rig Release: 7/8/2005 Rig Number: as OriS. t,;omrmssíon SPJcpff~~q1~0~004 End: 7/8/2005 7/7/2005 16:00 - 18:00 2.00 CONDHL P OTHCMP containing 55 gals of Corrosion Inhibitor (EC 1124-A). 18:00 - 19:00 1.00 CONDHL P OTHCMP PJSM with Little Red Test lines 4000 psi Reverse circulate 58 bbls of doesel for Freeze protection in 7" Csg. 19:00 - 22:00 3.00 DHEQP P OTHCMP Drop 1.5" setting ball and pump 11 bbls sea water place ball on seat of Hyro sub at 7461' I Rig up on Long String with Little Red Pressure up slowly to 3000 psi set GT packer at 7142' hold for 15 minutes I Pressure up to 3500 psi on US test for 30 min charted I Pressure up 4000 psi on US and shear ball seat. I Test Packer with 4000 psi on IA 30 min charted All good tests. Freeze Protect LS. 22:00 - 00:00 2.00 DHEQP P OTHCMP Rig up on Short String I Displace Tbg with diesel 2200'1 Drop ball let drop pump on seat with diesel Pressure up test Short String to 3000 psi for 30 min charted Good test 7/8/2005 00:00 - 00:30 0.50 RIGD P OTHCMP Rig down lines from from tree and circulating equip. 00:30 - 01 :30 1.00 RIGD P OTHCMP PJSM Pick up lubricator - Install BPV in US & S/S 01 :30 - 06:00 4.50 RIGD P OTHCMP Secure weill Release Rig I Move to MPC 13. Rig down. Prep to move off. Printed: 7/11/2005 10:18:12 AM ~~~~E (ID~~~~~~~~ . AT~SIiA OIL AND GAS CONSERVATION COMMISSION FRANK H. MURKOWSKI, GOVERNOR 333 W. 7'" AVENUE, SUITE 100 ANCHORAGE, ALASKA 99501-3539 PHONE (907) 279-1433 FAX (907) 276-7542 Fred Johnson Senior Drilling Engineer BP Exploration (Alaska) Inc. P.O. Box 196612 Anchorage, Alaska 99519-6612 Re: Milne Point MPB-27i Sundry Number: 305-076 Dear Mr. Johnson: Enclosed is the approved Application for Sundry Approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. Please provide at least twenty-four (24) hours notice for a representative of the Commission to witness any required test. Contact the Commission's petroleum field inspector at (907) 659-3607 (pager). As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the Commission grants for good cause -shown, a person affected by it may file with the Commission an application for rehearing. A request for rehearing is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls a h liday or weekend. A person may not appeal a Commission decision to Su or 0 unless rehearing has been requested. DATED this 1f. day of April, 2005 Encl. D15 1--( /1- (c . STATE OF ALASKA r 4---/f-05 REœlVEt) ALASKA ~ AND GAS CONSERVATION COMMISSION MAR 2. 5 2005 h~" APPLICATION FOR SUNDRY APPROVAL 20 AAC 25.280 Alaska Oil & Gas Cons. Commission . 1. Type of Request: o Abandon o Alter Casing o Change Approved Program º~nvert to DuaJJ"jector___ o Repair Well III Pull Tubing o Operation Shutdown o Plug Perforations o Perforate New Pool III Perforate o Stimulate o Waiver o Re-Enter Suspended Well III Other o Time Extension 2. Operator Name: BP Exploration (Alaska) Inc. 3. Address: P.O. Box 196612, Anchorage, Alaska 7. KB Elevation (ft): 4. Current Well Class: 181 Development D Exploratory D Stratigraphic D Service 5. Permit To Drill Number 204-221 6. API Number: 50- 029-23233-00-00 99519-6612 56.90' 9. Well Name and Number: MPB-27i 8. Property Designation: 10. Field / Pool(s): ADL 047438 Milne Point Unit / Schrader Bluff 11. Total Depth MD (ft): 8480 , Structural Total Depth TVD (ft): 4545 Lenath PRESENT WELL CONDITION SUMMARY Effective Depth MD (ft): Effective Depth TVD (ft): Plugs (measured): Junk (measured): 8480 4545 7400' N/A M[ITVD ' 0..., r 79' 3558' 20" 114' 114' 1530 520 9-5/8" 3593' 2863' 5750 3090 7" 7614' 4520' 7240 5410 4-1/2" 7471' - 8480' 4490' - 4545' 8430 7500 Surface IntAr Prnl'i"f"tinn liner 7581' 1009' Perforation Depth MD (ft): Perforation Depth TVD (ft): I 7298' - 7308' 4428' - 4432' Packers and SSSV Type: N/A Tubing Size: 4-1/2", 12.6# Tubing Grade: IBT-M/TCII Packers and SSSV MD (ft): I Tubing MD (ft): 7512' 12. Attachments: 181 Description Summary of Proposal 181 Detailed Operations Program 14. Estimated Date for Commencing Operations: D BOP Sketch 13. Well Class after proposed work: D Exploratory D Development 181 Service 16. Verbal Approval: Commission Representative: 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Printed Name A Fred Johns9n Title Senior Drilling Engineer Signature :Z J d ¿.. A .......... V ' , March 28, 2005 Date: 15. Well Status after proposed work: DOil DGas D WAG D GINJ D Plugged 181 WINJ D Abandoned D WDSPL Contact Jim Smith, 564-5773 Phone , Prepared By Name/Number: 564-5427 Date 'J,h </ ~.~- Sondra 564-4750 , "C ' I Sundry Number: ::3Þb -- ¿) 7~ Conditions of approval: Notify Commission so that a representative may witness D Plug Integrity D BOP Test ~echanicallntegrity Test 0 Location Clearance ath." ~ "'" ""'~ \-\ \ "\ __' ~"'ð 0"- «>,:\,'«\\0'"" ~-¥<.r- -\<ë",,~<,o.~~'" "'-0. -:,Iè "" -\c.1,;,\\;¡~ ~ <..~oz !. ~~~.- ""'!.;-"6.<,<t'ð \-'L \T () \S SO_O<OIZ Rl/~~ O\k=\-'<>"S~"~:::'~'O' \ ';, / /' Approved By. -r /I /~ COMMISSIONER THE COMMISSION Date tj¡K/ d!:> Form 10-403 RevbØ'66, > ',,' it/, i RBDMS BFL APR 1 ð 206 >ubrmt In Duplicate ~ . . AOGCC: Re: MPB-27 Pennit No. 204-221 Dear Sirs: Attached is a sundry application fonn 403 requesting approval to convert well MPB-27 from pre-production to water injection. The well was drilled and completed as a pre- produced injector in November of 2004. There was only very limited production made from the Schrader OA sand in an effort to clean up the completion prior to injection. The proposed work scope will include: · MIRV, ND tree, NU and test BOPE · Circulate out freeze protection fluid and circulate/kill well with seawater · POOH with existing 4-112" tubing completion · E-line perforate the Schrader NC and ND sands with 45' total perfs o 4.5-in HSD Powerjet, 5-spf, 4505 HMX o NC-sand: 7,298-ft to 7,313-ft MD (15-ft) o ND-sand: 7,322-ft to 7,352-ft MD (30-ft) o Reference log: MWD log 19 to 29Nov04 o If not yet obtained on pre-rig work, run in PDS mode. o Short joint: 7,115 to 7, 125-ft MD o RA Tag: 7,115-ft · Cleanout the seal bore extension below the liner hanger · Set RBP and stonn packer baniers, swap out tubing head for dual tubing head, remove packers · Run 2-3/8" dual completion o Set upper dual packer at 7, 160-ft MD. o Sting bottom completion seal nipple into PBR below 7" liner hanger · Set BPVs · RDMO Ô BP Alaska, Inc. u " 900 1800 2700 3600 Scete: Ilnch. 900ft North Slope, Alaska 0 ---- ---- 0 Milne Point Unit I I 0 J MPB-27 . ~',' " "!I! ,~ ~ I ..}~ J ) -900 I -900 . ,"J ~)UJl) * . . 800 Reference is True North I 1· I:..~ eroJ.'-1 I Current wen Properties w..: MP8-27 -1800 I "" ,,/~ ·1800 1,SJ Iu" HoIIøIntIII CooI'IInaIeI: . "'-f. GIobeI CootdineI.. : +8023092.10. +671997.32 I .'" IJ ·":I.j "'-f. ~pNcaf Coon:Iinet.. : 70- 28' 24.1468" N, 1049" 24' 42.9370- .~ 1800 AI<8 EIlv8lIon : ~., ~ 1 56.9Oft above Mean Sea Level I .,>-~ Norlh R~: True North \ Z - .~. .,: ,.,..,110 Un..: Feet (US Survey) I i -2700 ·2700 I 5J2!¡-'I""'Y-SUI! MPB-2711 I 4381.90 TVO. -3251.97. +3279.38 2..00 t·~ a"'ILLINCi 1i."VIC.a A HoI"u"o. ~.Y I MPB-27 12 I 4505.90 TVO. ·3636.55. +3130.65 " I -3600 -3600 I 3200 I I MPB-27 13 4506.90 TVO. ·3815.26. +2995.91 I I I -'" . í I --4500 --4500 . J I -4000 0 900 1800 2700 3600 I I s ,¡> ~ -MPB-27 (Surveys)- Scale: !Inch . 800ft ." . ,.,~ 800 001 = 6.1 0 1800 2400 3200 4000 4800 SectIOn Azifllll(l¡ ! ::~C'.d(q.í . . . ',1- I..; .:.: I ~ 1) : ~3.03.0S.006 6.B:2'1.@01i! e. e.1I22.@@1i! 6. IIZ L. ~~I! Eì.12m.ml<lll S. IU 9. ¡¡¡¡¡'III e.llje.00~ 6. ¡¡Wl. eel¡! 6.11:16.001.1 M Area of Investigation u 4-1/2" GLM at +/- 2000' MD 9-5/8", L-80, BTC 3594' 2868' TVD Perted and 7" at 7298'-7308' +/- 7500' MD Set at +/- 800 ..... ~ ... . . J. ---~~---------------~~ 9-5/8",40#, BTC-Mod 3594' MD, 2868' TVD TOL at +/- Set at +1- J. Smith . I -- -- -- -- -- -- -- -- -- -- -- -- -- -- - -- -- -- .1!IIIi\!II1I~..!IIIIIIIIIlf ;_""'_"'" ........... ----- / 8 . N " ... io N 2800 + \X ~ I? :! ,.." .-\~ ~ _,co ~~ &j(; ------, VJ,¿jj "1)1 \ <..J'<..J b\ [@ I !2/::;: I 20. .21 I Q:' \ I ,Q: · 19 I -~- , 18 . .24' I I , 8. · 121 I I I I 7. .141 / I I VICINITY MAP \ · 13 ........I0 ~RAVEL SI~~ N.T.S. I 11 . I :----: .2".... r- -_ ;:::;::: \ 9 . · 16 I -....."" I I I · 151 I 10. I 123. I - I 6 . · 22 I LEGEND - I .... PROPOSED CONDUCTOR I I --I 2 · 5 I . EXISTING CONDUCTOR B-27 ... I - /'- I · 3 ' . . Sf!: 18 I 17. I 25. I SEe 19' - . . . I 1 . · 4 I - I I I \ I 0 ¿. B-PAD ª ~ I :::!I + N 1000 NOTES 1. ALASKA STATE PLANE COORDINATES ARE ALASKA ZONE 4, NAD 27. 2. GEODETIC COORDINATES ARE NAD 27. 3. PAD SCALE FACTOR IS 0.999905887. 4. HORIZONTAL AND VERTICAL CONTROL IS BASED ON OPERATOR MONUMENTS B-1 AND B-2. 5. ELEVATIONS ARE BASED ON BPX MILNE PT. DATUM (M.S.L.). LOCA TED WITHIN WELL A.s. P . NO. COORDINATES 27 y= 6,023,092.17 X= 571,997.42 PROTRACTED SEC. 19, T. 13 N., R. 11 E., UMIAT MERIDIAN, PLANT GEODETIC GEODETIC GROUND COORDINATES POSITION(DMS) POSITION(D.DD) ELEVATION N. 1,438.00 70'28'24.147" 70.4733742' E. 604.00 149'24'42.934" 149.4119261' ALASKA SECTION OFFSETS 5,249' FSL 4,295' FEL o 9 30 04 ISSUED FOR INFORMA 1100 NO. OA 1E REVISION ~Î DRAWN: ALLISON b.p CHECI<ED: HACKLEMAN DATE: 9/30/04 , DRAWING: SHEET: fRB04 MPB 02-00 MILNE POINT UNIT ~ [f)gj~[ ]œo JOB NO: SCALE: PROPOSED WELL CONDUCTOR RfA K'M-t EMCINEERSlINDlANIISIJR'o'EYCRS WELL 8- 27 1 Of 1 801 'fiat M£'/IEtO L.N4[ l' = 400' BY CHK ~AŒ. ALASICA 99503 . . ifOl.\- d- d- \ HECRANICAL INTEGRITY REPORT' '.., \\1 -. :?UD DA::::: lòH:yQ l...\.. ?IG R.sl...s;_S:::: . \~ 1\ -oy , OPER & FIELD ~'Y M\\~?cl\,,-~ "W"ELL NUMBER K ~ \'S -à ~ rn: ~4<tsb.MD.. 4S.45"' TVD i ?BTD: MD TVD ~~LL DATA Cas ing : \ ~~~~iJ _ . _-,-.,e.:. . '-"I'd- Shoe: ~<o\\..~ MD L\SciC) TVD¡ DV: ~~ MD ·TVD Shoe: )S~~Ò MD y9-(Ç TVD i :C?: ~L\~ \ l-m 4L-\~t) :VD _'JD~;:;g: Pé!.cke~ . HI) TVD i See ê t ::ole Siz.e ~~ ,~, ana G y", . P er£s "1.<oD<.o ~~~ to <6\.\~ Ç" ...' <> ~ \\~ ~?-. ~~-'\~\""3 ")~ ':>';} -~šS;l. :--:EC7.ÞJEC';'~ INTEGRITY - PART /1 Annulus Press Test: ~p 15 min ; 30 min COITi!:ùents: k\T ~~"'d o..~-\e~~~~ /' ~CRÞ..NICÞ.L INTEGRITY - PART 12 ~ "~h~\";) ; DV ~~ ~~ \ Csg ~\~ Cement: Volumes:' Þ-..mt, l.iner CUlt -,101 to caveI' perfs C ~~o '1. ~ \~~ -=-~ <;.~~,,<:..'\(.~~ ~ ~'-.)\$~ ~~ \>~~ ~\..;)~ SC)Ò' Thear::;: T~()~ ~~<:~ 1~'<-~\\<:'\~k~() nhc-c:J \.J Cement Bond Log (Yes or No) '{<t~ i n AOGCC File ~~~ CBL Evaluation, zone above perfs \:-o~\rck... '\'<""'t-~~ ~. ~...,.._~ \"'-\<o~"~ -\,,~~~-\- ~cJ\~~~c..\ 9;:;)CY-'\'d-S(J. <".,......\\<:i." ~~~\-\,..\. e~">~ ~ Proà.uc..tion Log: Type ¡Evaluation 'I CONCLUSIONS: j ?art ;1: ?ar~ #2: V\. ~ \~ '~\-co,-kO M?yV( t..t (\ ~ -(J ç-- - Schlumberger Schlumberger-DCS 2525 Gambell St, Suite 400 Anchorage, AK 99503-2838 A TTN: Beth . 202-009 /).~ ¡/'_ "I "- MPS-21 <7-tTf/ - >eT-MPE_25 l1 '76 '-I . 1?,;2" - MPG-19 ""'" d ~PB-27 P-O I,; 2-').1. MPE-25A nO ¡./-()~'1.. ¿;/ MPC-42 ..L E-102 Âo'l-02,(/ ;20{- 1'i0 Well 10670013 10687675 10900120 10964102 10703992 10830797 10672379 Job# Log Description MEM CBl CBl SCMT SCMT SCMT SCMT RST 05/03/04 03/30/04 11/25/04 11/30/04 04/18/04 05/01/04 05/01/04 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COpy EACH TO: BP Exploration (Alaska) Inc. Petrotechnical Data Center LR2-1 900 E Benson Blvd. Anchorage AK 99506-4254 Date Delivered: . ;;þ:6) 02/22/05 NO. 3346 Company: Alaska Oil & Gas Cons Comm Attn: Helen Wannan 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Field: Milne Point Midnight Sun Date Bl CD Color Schlumberger OCS 3940 Arctic Blvd Suite 300 Anchorage AK 99503-5769 tL ::~.ë)(;¡¡:.lllL Ú~ . t- _ STATE OF ALASKA a ALAS~IL AND GAS CONSERVATION CO.3SION WELL COMPLETION OR RECOMPLETION REPORT AND LOG :1 1a. Well Status: 181 Oil 0 Gas 0 Plugged 0 Abandoned 0 Suspended 0 WAG 20AAC 25.105 20AAC 25.110 21. Logs Run: MWD , GR , IFRlCASANDRA , RES, ABI , SCMT , CCL CASING, LINER AND CEMENTING RECORD SElTINGPEPTH. MD SETTING DEPTH TVD HOl.E Top BOTTOM Top BOTTOM SIZE 35' 114' 35' 114' 42" 35' 3593' 35' 2863' 12-114" 33' 7614' 33' 4520' 8-3/4" 7471' 8480' 4490' 4545' 6-1/8" o GINJ 0 WINJ 0 WDSPL No. of Completions 2. Operator Name: BP Exploration (Alaska) Inc. 3. Address: P.O. Box 196612, Anchorage, Alaska 99519-6612 4a. Location of Well (Governmental Section): Surface: 5249' NSL, 4295' WEL, SEC. 19, T13N, R11E UM Top of Productive Horizon: 1643' NSL, 1167'WEL, SEC. 19, T13N, R11E, UM (OA) Total Depth: 954' NSL, 1760' WEL SEC. 19, T13N, R11E, UM (OA) 4b. Location of Well (State Base Plane Coordinates): Surface: x- 571997' y- 6023092' Zone- ASP4 TPI: x- 575175 y- 6019518 Zone- ASP4 - - Total Depth: x- 574591 { y- 6018823"' Zone- ASP4 18. Directional Survey 181 Yes 0 No 22. CASING SIZE WT. PER FT. 92# 40# 26# 12.6# GRADE H-40 L-80 L-80 L-80 20" 9-5/8" 7" 4-1/2" 23. Perforations op'en to Production (MD + TVD of Top and Bottom Interval, Size and Number; if none, state "none"): 4-1/2" Slotted Liner MD TVD MD TVD 7606' - 8435' 4520' - 4537' One Other 5. Date Comp., Susp., or Aband. 12/1/2004 I 6. Date Spudded 11/20/2004 7. Date T.D. Reached 11/28/2004 .' 8. KB Elevation (ft): 56.90' 9. Plug Back Depth (MD+ TVD) 8480 + 4545 10. Total Depth (MD+TVD) "' 8480 + 4545 11. Depth where SSSV set N/A MD 19. Water depth, if offshore N/A MSL 24. SIZE 4-1/2", 12.6#, TCII 1 b. Well Class: 181 Development 0 Exploratory o Stratigraphic 0 Service 12. Permit to Drill Number 204-221 13. API Number 50- 029-23233-00-00 14. Well Name and Number: MPB-27 15. Field / Pool(s): Milne Point Unit 1 Schrader Bluff Ft Ft 16. Property Designation: ADL 047438 17. Land Use Permit: 20. Thickness of Permafrost 1800' (Approx.) AMOUNT PULLED 260 sx Arctic Set (Approx.) 443 sx AS Lite, 372 sx Class 'G' 370 sx Class 'G' Uncemented Slotted Liner TUSING RECORD DEPTH SET (MD) 7512' PACKER SET (MD) None 25. At;ID, F~CTORe.ÇEMENT DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED Freeze Protected with 88 Bbls of Diesel PRODUCTION TEST Method of Operation (Flowing, Gas Lift, etc.): N/A Oll-BSl GAs-McF W A TER-Bsl GAs-McF WATER-Bsl 26. Date First Production: Not on Production Date of Test Hours Tested PRODUCTION FOR TEST PERIOD .. Flow Tubing Casing Pressure CALCULATED -Ào.. Press. 24-HoUR RATE""?" 27. CORE DATA Brief ~escriptio~ of !ithology, porosity, fractures, apparent dips and p,r.es.elJç~Qfpil, gas or watef..((ltaëf~~~f)f necessary). Submit core chips; If none, state "none" .j:'!;\'; .. \ i.', ,; ; l "!k"i',.,~!.T...·, '\~i'.. .ë,J Oll-BSl None RBDMS 8Ft ,IAN 2 1 2005 Form 10-407 Revised 12/2003 ¡ "/b ..1.··. ~L':-þ........... 'I v~ .~ V££!.'.'.r."..... I.... J~~',! "i..."......~:... .,...~..__....,_.,..y.;-;..: CONTINUED ON REVERSE SIDE CHOKE SIZE I GAS-Oil RATIO Oil GRAVITY-API (CORR) J'A· .N, I .~ t~ . - ..t..~)I ~y 28. GEOLOGIC MARKE. 29. . FORMATION TESTS NAME MD TVD Include and briefly summarize test results. List intervals tested, and attach detailed supporting data as necessary. If no tests were conducted, state "None". MA SBF2-NA SBF21 SBF24-MF SBF12 SBE4-NC SBE41 SBE3-ND SBE2-NE SBE1-NF TSBD-OA TSBC 6681' 7178' 7195' 7212' 7286' 7295' 7314' 7323' 7371' 7477' 7565' 8394' 4174' 4386' 4392' 4398' 4424' 4427' 4434' 4437' 4454' 4492' 4514' 4531' None 30. List of Attachments: Summary of Daily Drilling Reports, Well Schematic Diagram, Surveys and a Leak-Off Test Summary foregoing is true and correct to the best of my knowledge. Signed ~ Technical Assistant Date Ol-lO-D~ 204-221 Prepared By Name/Number: Sondra Stewman, 564-4750 Drilling Engineer: Skip Coyner, 564-4395 Permit No. / Approval No. INSTRUCTIONS GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. ITEM 1a: Classification of Service Wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. ITEM 4b: TPI (Top of Producing Interval). ITEM 8: The Kelly Bushing elevation in feet above mean low low water. Use same as reference for depth measurements given in other spaces on this form and in any attachments. ITEM 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00). ITEM 20: True vertical thickness. ITEM 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. ITEM 23: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). ITEM 26: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, or Other (explain). ITEM 27: If no cores taken, indicate "None". ITEM 29: List all test information. If none, state "None". Form 10-407 Revised 12/2003 Submit Original Only ,Tree: Cameron 4 1.'" 5M Wellhead: FMC 11 " 5M, Gen. 5 wI 11" x 4. C Tbg. Hnr. wI 4.5 TC-11 Top & Btm." 4" CIW 'H' BPV profile 20" 92 ppf, H-40 I 80' KOP @ 300' Max. hole angle = 64 to 70 deg. f/2900' to 7,500' Hole angle through perfs = 90 deg. 95/8",40 ppf, L-80 Btrc. I 3,593' I ~ 4.5" 12.6 ppf, L-80 IBT-M tubing (cap. = 0.0152 bpf, drift = 3.958") 7" 26 ppf, L-80, btc production casing ( drift ID = 6.151 ", cap. = 0.0383 bpf) Short Joint 7,115 - 7,125' 7" "RA Tag" Installed in couPling 7,115' I Perforation Summary Ref log: Size SPF Interval (TVD) Weatherford Float Collar I 7,527' Weatherford Float Shoe I 7,614' "> DATE 12/07/04 MPU B-27i ) . ~ REV. BY COMMENTS MDO Drilled and completed by Doyon-14 ~ ~i~. KB. elev.: 57.3?' ,.,;;ng. GL. elev.-. 23.3 . Orig. DF. elev. = 56.9' , . ¡ 4.5"x1" Cameo KGB-2 GLM I 2,762' I ~ NOTE: Minimum id 2.90" @ 7,468' 4.5" "XD" Duro slv. I 7,186' I 4.5" HES XN-Nipple (3.725") I 7,251' I Baker No-Go Locator I 7,479' I 4" Bonded seal assy. I 7,500 - 7,512\ Baker Tie back sleeve 7,471' 7"x5" Baker zxp Liner top 7,483' Baker HMC liner hgr. w/dg slips 7,490' Baker 80-40 Seal bore ex!. 5" /7,498' " 7,517' HES 4.5" "V" Float shoe 8480' 1 20 joints of slotted liner 7,605' - 8,425' MILNE POINT UNIT WELL B-27i API NO: 50-029-23233-00 BP EXPLORATION (AK) Legal Name: MPB-27 Common Name: MPB-27 11/23/2004 11/28/2004 FIT FIT 3,592.0 (ft) 7,613.0 (ft) 2,866.0 (ft) 4,520.0 (ft) 9.00 (ppg) 9.20 (ppg) 447 (psi) 660 (psi) 1,787 (psi) 2,820 (psi) 12.00 (ppg) 12.01 (ppg) . . Printed: 12/6/2004 9:20:07 AM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: MPB-27 MPB-27 DRILL+COMPLETE DOYON DRILLING INC. DOYON 14 Start: Rig Release: Rig Number: 11/15/2004 12/1/2004 Spud Date: 11/20/2004 End: 12/1/2004 11/18/2004 12:00-14:00 2.00 MOB P PRE Skid rig floor, remove conveyor 14:00 . 16:00 2.00 MOB P PRE Move rig off MPG·03 16:00- 18:00 2.00 MOB P PRE Install Booster wheels 18:00 - 22:30 4.50 MOB P PRE Move rig and camp to MPB-27 22:30 . 00:00 1.50 MOB P PRE Remove booster wheels 11/19/2004 00:00 - 02:00 2.00 MOB P PRE Spot rig over MPB-27 02:00 . 07:00 5.00 MOB P PRE Skid floor, Hook up conveyor, spot rock washer, water tanks, mwd house, mud lab., rigging up, Rig accept @ 07:00 11/19/2004 07:00 - 10:30 3.50 RIGU P PRE Nipple up diverter, inspect derrick 10:30 . 11 :00 0.50 RIGU P PRE Service rig and top drive 11:00-21:00 10.00 DRILL P SURF Picking up drill pipe and standing in derrick, 258 jts., 86 stands 21 :00 . 22:30 1.50 DRILL P SURF Picking up HWDP and Jars, standing in derrick 22:30 . 00:00 1.50 DRILL P SURF Picking up BHA # 1, Bit motor, MWD 11/20/2004 00:00 . 01 :30 1.50 DRILL P SURF Finish picking up BHA 01 :30 . 03:30 2.00 DRILL P SURF Slip and cut 1029' of drilling line, service topdrive 03:30 - 04:00 0.50 BOPSUB P SURF Funtion test Diverter, the right to witness test was wavier by I..ou Grimauldi, Rig up Sperry sun Gyro unit 04:00 . 05:00 1.00 DRILL P SURF Pre spud meeting with crew, fill hole and check for leaks 05:00 . 06:30 1.50 DRILL P SURF Spud well, Drilling 114 to 254', 50 rpms, 400 gpm, 1000 psi, 06:30 . 07:30 1.00 DRILL P SURF Picking up 8" dcs 07:30 - 00:00 16.50 DRILL P SURF Drilling 254' to 1288' with 450 gpm, 1200 psi, 70 rpms, AST 7.85, ART 2.90, Tq 3500 Run Gyros every 100 ft. from 100 to 700', Catching mud and cutting samples every 500 ft. 11/21/2004 00:00 . 06:30 6.50 DRILL P SURF Drilling 1288' to 2,244' with 500 gpm, 2000 psi, 70 rpms, Catching mud and cutting samples every 500 ft. 06:30 . 07:30 1.00 DRILL P SURF Circ. two bottoms up, 1900 psi, 500 gals per min., 70 rpms 07:30 - 08:30 1.00 DRILL P SURF Pumping out with full drillng rate to HWDP 08:30 . 09:00 0.50 DRILL P SURF Rih to 2244', wash last stand to bottom. 09:00 - 10:30 1.50 DRILL N DFAL SURF Circ. and check out surface MWD eq., pump water pill, MWD would not turn on. 10:30 - 11 :30 1.00 DRILL N DFAL SURF Pumping out with full drillng rate to HWDP 11 :30 . 13:00 1.50 DRILL N DFAL SURF Standing back BHA, laying down MWD 13:00 - 15:30 2.50 DRILL N DFAL SURF Picking up BHA # 2, surface test MWD tools 15:30 . 16:30 1.00 DRILL N DFAL SURF Rih, wash last stand to bottom 16:30 - 00:00 7.50 DRILL P SURF Drilling 2244' to 3100' with 500 gpm, 2100 psi, 70 rpms, Catching mud and cutting samples every 500 ft. 11/22/2004 00:00 - 01 :30 1.50 DRILL P SURF Drilling 3100' to 3312' with 500 gpm, 2200 psi, 70 rpms, Catching mud and cutting samples every 500 ft. 01 :30 - 02:00 0.50 DRILL P SURF Circ out Hydrates, raise mud wt from 9.3 to 9.5 02:00 - 04:30 2.50 DRILL P SURF Drilling 3312' to 3603' TD with 500 gpm, 2400 psi, 70 rpms, 04:30 . 06:30 2.00 CASE P SURF Circ. Three bottoms up with 80 rpms, 520 gpms, 2450 psi 06:30 - 07:30 1.00 CASE P SURF Pumping out with full drilling rate to 2060' 07:30 - 08:00 0.50 CASE P SURF Rih wash last stand to bottom 08:00 - 10:00 2.00 CASE P SURF Circ. three bottoms up with 80 rpms, 520 gpms, 2450 psi 10:00 - 12:00 2.00 CASE P SURF Pumping out to HWDP with full drilling rate 12:00-14:00 2.00 CASE P SURF Standing back BHA, laying down MWD and Motor 14:00-15:30 1.50 CASE P SURF PJSM, Rig up to run 9.625 csg 15:30 - 19:30 4.00 CASE P SURF Picking up 87 jts of 9.62540# L-80 BTC csg; land same with P/u 185K, SIO 120K, shoe @ 3592, float 3507 19:30 - 20:00 0.50 CASE P SURF RID Franks tool and rig up cement head 20:00 - 21 :30 1.50 CASE P SURF Circ and thin mud for cement job, 400 gals min. 340 psi Printed: 12/6/2004 9:20:12 AM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: MPB-27 MPB-27 DRILL+COMPLETE DOYON DRILLING INC. DOYON 14 Start: Rig Release: Rig Number: 11/15/2004 12/1/2004 Spud Date: 11/20/2004 End: 12/1/2004 11/22/2004 21 :30 - 23:30 2.00 CEMT P SURF Cement with Schlumberger, Pump 5 bbls water, test lines to 3000 psi, 15 bbls water, 25 bbls CW1 00, 75 bbls Mud Push mixed @ 10.5, Drop bottom plug, ~sx. 350 bbls ASL cement mixed @ 10.7 yield 4.44, tail with 372 ø80 bbls Class G mixed @ 15.8 yield 1.21, drop top plug, kicked out with 30 bbls water, cement was mixed and pump 7-8 bbls min. 200- 300 psi 23:30 - 00:00 0.50 CEMT P SURF Displace with rig pumps @ 6-7 bbls min, 300 to 700 psi, full returns 11/23/2004 00:00 - 00:30 0.50 CEMT P SURF Displace with rig pumps @ 6-7 bbls min, 300 to 700 psi, full retums, bump plug with 1700 psi, floats held, 29Q<bQisof good cement to surface 00:30 - 01 :30 1.00 CASE P SURF Rig down cement head and landing jt., flush hydrill, flow lines 01 :30 - 02:00 0.50 CASE P SURF Change out bails, csg Equip., clear floor 02:00 - 03:30 1 .50 CASE P SURF Nipple down diverter 03:30 - 04:00 0.50 CASE P SURF Nipple up starting head, test meteal to metal seal to 1000 psi for 10 min. 04:00 - 05:30 1.50 CASE P SURF Nipple up BOPS 05:30 - 06:30 1.00 CASE P SURF PJSM - Install test plug - Rig up testing equipment 06:30 - 10:30 4.00 CASE P SURF Test BOPS - Annular 250 low 2500 high 5 mins each test - Pipe - Blind rams - Choke Manifold - HCR Choke - Kill - Manual choke - kill valves - Upper I Lower IBOP - Floor valves - 250 low 3500 high 5 mins each test - Acc~""'- John Crisp with AOOCC witness BOP test·· Inspect derrick 10:30 - 11 :00 0.50 CASE P SURF Pull test plug - Install wear ring - Close Annulus valves - Rig down testing equipment 11 :00 - 11 :30 0.50 CASE P SURF Change out bails - Install elevators - Mobilize BHA to rig floor and steam same 11 :30 - 13:00 1.50 CASE P SURF Make up bit - motor - MWD - Orient same - PU DC's - RIH with HWT - Test MWD 13:00 - 14:00 1.00 CASE P SURF Con't RIH to 3490' - Break circ 14:00 - 15:30 1.50 CASE P SURF Rig up to test casg - Test casing to 2000 psi for 30 mins 15:30 - 16:30 1.00 DRILL P SURF Drill out float equipment to shoe @ 3592' - Drill rat hole to 3603' - Drill 20' new hole to 3623' 16:30 - 17:00 0.50 CASE P SURF Circ hole clean - Displace to 9 ppg LSND mud 17:00 - 18:00 1.00 EVAL P SURF Rig up to FIT - RUn FIT· 9 ppg - Surface pressure 447 psi - MD 3952 - TVD 2862 == EMW 12 ppg - Rig down testing equiJHTI~t 18:00 - 00:00 6.00 DRILL P INT1 Directional Drill from 3623' to 4455' - WOB 5 to 20 - RPM 70 - TO on 5 - off 5 - GPM 550 - PP on 2980 - off 2880 - PU 130- SO 86 - ROT 100 11/24/2004 00:00 - 11 :30 11.50 DRILL P INT1 Directional Drill from 4455' to 5887' - WOB 20 - RPM 70 - TO on 6 - off 5 - GPM 550 - PP on 3490 - off 3330 - PU 145 - SO 87 - ROT 100 - (Coal section from 5325' to 5330') 11 :30 - 12:30 1.00 DRILL P INT1 CBU 2 X - GPM 550 - PP 3350 - RPM 70 - TO 6 12:30 - 15:00 2.50 DRILL P INT1 Pump out from 5887' to 3592' at shoe - Pump at 500 GPM - No Problems - Hole good 15:00 - 15:30 0.50 DRILL P INT1 CBU 1 X - GPM 500 - PP 2530 - RPM 60 - TO 5 15:30 - 16:30 1.00 DRILL P INT1 RIH from 3592' to 5887' - Ledge @ 5498 - Precauctionary wash from 5792 to 5887' 16:30 - 00:00 7.50 DRILL P INT1 Directional Drill from 5887' to 6560' - WOB 15 to 25 - RPM 70- TQ on 8· off 7 - GPM 530 - PP on 3690 - off 3640 - PU 153- SO 90 - ROT 110 11/25/2004 00:00 - 14:00 14.00 DRILL P INT1 Directional Drill from 6560' to 7614' - T.D. 83/4" hole - WOB 5 Printed: 12/6/2004 9:20: 12 AM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: MPB-27 MPB-27 DRILL+COMPLETE DOYON DRILLING INC. DOYON 14 Start: Rig Release: Rig Number: 11/15/2004 12/1/2004 Spud Date: 11/20/2004 End: 12/1/2004 11125/2004 00:00 - 14:00 14.00 DRILL P INT1 to 25 - RPM 70 - TO on 7.5 - off 6 - GPM 500 - PP on 3650- off 3450 - PU 152 - SO 95 - ROT 115 14:00 - 15:30 1.50 CASE P INT1 CBU 2 X - GPM 525 - PP 3540 - PU 152 - SO 95 - ROT 115 15:30 - 21 :30 6.00 CASE P INT1 Pump out from 7613' to 5315' - Survey 5 X from 7681 to 6697'- Tight packing off @ 5984' - Regain circ - Back ream from 5984' to 5794'. @ 50 rpm 40 spm - Pump out with out back ream from 5794' to 5699' @ 50 RPM 50 spm - Packing off tight @ 5699' - Regain circ - Back ream from 5699' to 5315' @ 50 RPM 50 spm - Hole very ratty unstable and packing off with pump rates above 50 spm - From 6000' to 5320' 21 :30 - 23:00 1.50 CASE P INT1 CBU 1.5 X - GPM 335 - PP 1550 - RPM 63 - TO 7 - (Massive. amounts coal over shakers - Sizes as big as your open hand and 1" te 1 1/2" thick to drill cuttings size) - Hole did not completely clean up 23:00 - 00:00 1.00 CASE P INT1 RIH from 5315' tp 7613' - Bridge @ 5503' - Work through bridge from 5503' to 5509' - Did not ream out or circulate through this section as hole was very ratty and unstable with pump on - From 5315' to 5503' and from 5509' to 7613' no other problems on trip in 11/26/2004 00:00 - 02:00 2.00 CASE P INT1 CBU 3 X - RPM 70 - TO 8.5 - GPM 500 " PP 3550 - Flow check - Well Static 02:00 - 1 0:30 8.50 CASE P INT1 Pump out from 7613 to 6000' at 418 GPM - Pump out from 6000' to 5150' at 60 spm through ratty section - Pack -off @ 5150' - Back ream at 60 RPM 75 spm from 5150 to 5116'- Pump from 5116' to 5046' @ 75 spm - Pack-off - Back ream from 5076' to 3600' staging up pump rates from 60 spm to 100 spm - RPM 70 10:30 - 11 :00 0.50 CASE P INT1 CBU 2 X @ Shoe - 450 GPM - 1920 psi - 50 RPM 11 :00 - 13:00 2.00 CASE P INT1 RIH frrom 3600' to 7613' - No problems 13:00 - 14:30 1.50 CASE P INT1 CBU 3 X - Pump weighted Hi-vis sweep - @ 500 GPM - PP 3480 - RPM 70 - Lots of coal cuttings over shakers - Flow check - Well static 14:30 - 17:00 2.50 CASE P INT1 Pump out from 7613' to 5196' - Pump 460 GPM - PP 2350 - No Problems hole in good shape 17:00 -18:00 1.00 CASE P INT1 CBU 1.5 X - Pump Hi-vis weighted sweep - GPM 470 - PP 2550 - RPM 70 - Shakers cleaned up - Flow check - Well static 18:00 - 20:00 2.00 CASE P INT1 Con't Pump out to shoe from 5196' to 3550' - GPM 460 - PP 2350 - Hole in good shape no problems - 20:00 - 20:30 0.50 CASE P INT1 CBU 1 X - GPM 480 - PP 2230 - RPM 50 - Shalkers clean - Flow check - Well static - Pump dry job 20:30 - 21 :30 1.00 CASE P INT1 POH from 3550' to BHA @ 715' 21 :30 - 00:00 2.50 CASE P INT1 Lay down 5" HWT I BHA 11/27/2004 00:00 - 00:30 0.50 CASE P INT1 Pull wear ring - Install test plug - Change pipe rams to 7" casg rams - Test door seals to 1500 psi - Pull test plug 00:30 - 03:00 2.50 CASE P INT1 Rig up casg tools to run 7" casg 03:00 - 07:00 4.00 CASE P INT1 PJSM - Pick up float joints - Check floats - Pick up and run 7" L-80 BTC-M 26# casg to 3587' 07:00 - 07:30 0.50 CASE P INT1 Circulate 7" casg vol 137 bbls @ 6 bpm 500 psi 07:30 - 11 :00 3.50 CASE P INT1 Con't RIH with 7" casg from 3587' to 7613' - No Problems 11 :00 - 12:00 1.00 CASE P INT1 Break Circulation and Circ one casg vol 290 bbls with Franks fill up tool - Staging up pumps from 3.8 bpm 500 psi to 5.8 bpm at 630 psi - PU 210 - SO 110 12:00 - 13:30 1.50 CEMT P INn Rig down Franks fill up tool - Rig up Dowell Schlumberger Printed: 12/6/2004 9:20: 12 AM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: MPB-27 MPB-27 DRILL+COMPLETE DOYON DRILLING INC. DOYON 14 Sta rt: Rig Release: Rig Number: 11/15/2004 12/1/2004 Spud Date: 11/20/2004 End: 12/1/2004 11/27/2004 12:00 - 13:30 1.50 CEMT P INT1 Cementing head - Re-establish circulation at 5 bpm at 430 psi 13:30 - 16:00 2.50 CEMT P INT1 PJSM - Cement 7" - Give to Dowell Schlumberger Pump 5 bbls water Test lines to 3500 psi Pump 25 bbls CW-100- Pump 40 bbls Mud Push spacer mixed at 10.5 ppg Drop bottom plug Pun'tf)79 bbts -369.8 sxs - Yield 1.20 - mixed at 15.8 ppg - Class "G" cement Drop Top Plug Kick out plug with 20 bbls water Give to rig for displacement - 265 bbls of pre-treated LSND mud - Full returns through out job - recipf'OCI¡\ted through out entire job - PU 185 - SO 88 - Final displacement pressure 800 - Bump plug with 1850 psi - Bleed off check floats - Floats holding - CIP 14:50 hrs 16:00 - 16:30 0.50 CASE P INT1 Test casing to 3000 psi for 30 mins - recorded on chart 16:30 - 17:30 1.00 CASE P INT1 Rig down cementing head - Flush stack - Blow down lines - Lay down cementing tools 17:30 - 18:30 1.00 CASE P INT1 PJSM - Nipple down BOP - Pick stack 18:30 - 19:30 1.00 CASE P INn Pick up string to 205K - Set slips - 205K - 50K block weight = 155K string weight on slips - Blow down landing joint - Rig up CIW mechanical casg cutter - Cut off 7" casg 19:30 - 20:30 1.00 CASE P INT1 Nipple up BOP stack - Set FMC Pack-off - Test to 4300 psi - 10 mins 20:30 - 21 :30 1.00 CASE P INT1 Chaoge.rams.from 7" casgto V8riable pipe rams - TesHo 250 low -.3500 higbfo/l5 min8 each test - (Freeze protect OA anl'lUlO$ with 60 bblsdiesel-I~ 15tID - FCP1625 - Shut in pre&S1Jre iOO - Pumped at 2.8 bpm) 21 :30 - 22:00 0.50 CASE P INn Lay down casg tools - Change out bails on blocks - Clear rig floor 22:00 - 00:00 2.00 CASE P INT1 PJSM - Mobilize BHA to rig floor - Make up BHA - Orient MWD 11/28/2004 00:00 - 00:30 0.50 CASE P INT1 Con't make up BHA - Surface test MWD - 5.8 bpm 950 psi 00:30 - 03:00 2.50 CASE P INT1 RIH from 210' to 7400' 03:00 - 04:30 1.50 CASE P INT1 Cut Drlg line - Service Top drive I Rig 04:30 - 08:00 3.50 DRILL P INT1 Tag cement @ 7477' - Wash ream cement from 7477' to float collar 7527' - Drill shoe track and 20' new hole from 7613' to 7633' - GPM 251 - PP 1770 - RPM 40 - TO 7K 08:00 - 09:00 1.00 CASE P INT1 Displace LSND mud with 9.2 ppg Flo-Pro - GPM 251 - PP 1750 - RPM 40 - TO 7K 09:00 - 10:00 1.00 EVAL P INT1 Preform FIT - MW 9.2 - MD 7613- TVD 4520 - Surface pressUØf 661)... EMW 12 ppg 10:00 - 21 :30 11.50 DRILL P PROD1 Directional Drill from 7633' to 8480' - WOB 5 - RPM 70 - TO on 5 - off 5 - GPM 251 - PP on 2380 - off 2270 - PU 124 - SO 86- ROT 103 21 :30 - 22:30 1.00 CASE P PROD1 CBU 2 X - GPM 251 - PP 2230 - RPM 70 - TO 5 - Flow check - Well static 22:30 - 23:30 1.00 CASE P PROD1 Pump out to shoe from 8480' to 7583' - Pump at drlg rate 251 gpm - 1980 psi 23:30 - 00:00 0.50 CASE P PROD1 CBU 1 X - GPM 250 - PP 1980 - RPM 50 - TO 4.5 11/29/2004 00:00 - 00:30 0.50 CASE P PROD1 Con't Circulate - GPM 251 - PP 1980 - RPM 50 - TO 4 00:30 - 01 :00 0.50 CASE P PROD1 RIH from 7583' to 8480' - Hole in good shape 01 :00 - 02:30 1.50 CASE P PROD1 CBU 3 X - GPM 251- PP 2050 - RPM 70 - Tà 5 - Flow check- Printed: 12/6/2004 9:20:12 AM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: MPB-27 MPB-27 DRILL+COMPLETE DOYON DRILLING INC. DOYON 14 Start: Rig Release: Rig Number: 11/15/2004 12/1/2004 Spud Date: 11/20/2004 End: 12/1/2004 11/29/2004 01 :00 - 02:30 1.50 CASE P PROD1 Well Static 02:30 - 03:30 1.00 CASE P PROD1 Pump out to shoe from 8480' to 7583' - GPM 251 - PP 1950 03:30 - 04:30 1.00 CASE P PROD1 CBU - GPM 251 - PP 1850 - RPM 50 - TO 4 - Flow check - Well static 04:30 - 07:30 3.00 CASE P PROD1 Pump dry job - POH from 7583' to BHA @ 210' 07:30 - 08:30 1.00 CASE P PROD1 Lay down BHA 08:30 - 09:00 0.50 CASE P PROD1 Clear rig floor 09:00 - 10:30 1.50 CASE P PROD1 Rig up casing tools- PU and run 4 1/2" slotted liner 10:30 - 13:30 3.00 CASE P PROD1 Rig up inner string tools - PU and run 2 3/8" inner string - Make u[p Baker seal bore - HMC Liner hanger - ZXP liner top packer - Fill pipe - Rig down inner string tools 13:30 - 17:00 3.50 CASE P PROD1 RIH with liner on DP to 7613' Fill every 20 stands - 3 bpm @ 825 psi 17:00 - 17:30 0.50 CASE P PROD1 Pump drill pipe and liner vol at shoe 3 bpm 820 psi 17:30 - 18:00 0.50 CASE P PROD1 Can't RIH with from 7613' to 8480' - PU 131 - SO 100 18:00 - 18:30 0.50 CASE P PROD1 Break circ - Pump 50 bbls 9.2 ppg KCL - Drop ball - Pump ball on seat @ 5 bpm 1080 psi - Slow last 10 bbls to 1 bpm 18:30 - 20:30 2.00 CASE P PROD1 Pressure up to 3500 psi - Bleed off- Slack off 25K - PU to 140 hanger did not appear to have released - Work string from 140 to 50 - Pressure up to 4000 - Bleed off pick up to 140 - Released off liner - Slack off set 40k down to set ZXP packer work string three times - Close Annular - pressure up to 1500 psi - hold for 10 mins - to confirm packer set - Test good- Bleed off pressure - Open Annular - Pull one stand - Pressure up to 4225 psi blow ball 20:30 - 21 :30 1.00 CASE P PROD1 Pump out inner string at 1 bpm @ 310 psi to top of liner tie back sleeve 21 :30 - 22:30 1.00 CASE P PROD1 PJSM - Displace with 30 barrel pill with 4 drums EP mud Lube - 9.2 KCL water - Pump at 10 bpm @ 3050 psi - Flow check- Well static 22:30 - 00:00 1.50 CASE P PROD1 Lay down 4" Dp 11/30/2004 00:00 - 04:30 4.50 CASE P PROD1 Lay down 4" DP 04:30 - 05:00 0.50 CASE P PROD1 Service break Baker running tools - Lay down running tools 05:00 - 06:30 1.50 CASE P PRODt Lay down 2 3/8" inner string 06:30 - 07:30 1.00 CASE P PROD1 Lay down 8 Stands of 4" out of derrick 07:30 - 08:00 0.50 CASE P PROD1 Clear rig floor form all 2 3/8" handling tools 08:00 - 19:00 11.00 EVAL P PROD1 Rig up Schlumberger- Run GR I'SCMrf CCllog" Run in hole work log down to 7100' could not get pass 7100' - Log up to 5000' - Pull out hole to 2000' - Run back to bottom on 2nd attempt - Ran in hole to>7£53' - Log up for repeat log to 5000' - Pull out to 2000' - Run in hole for 3rd attempt - Run in to 7253' could not get passed 7253' POH - Rig down Schlumberger 19:00 - 20:00 1.00 CASE P PROD1 Pull Wear ring - Clear rig floor of all 4" and 3 1/2" handling tools - Wear ring - Test plugs - Running tool 20:00 - 20:30 0.50 RUNCOMP RUNCMP Rig up completion handling tools 20:30 - 00:00 3.50 RUNCOMP RUNCMP PJSM - Pick up and Run 4 1/2" completion to 4767' - (total joints ran 116) 12/1/2004 00:00 - 02:00 2.00 RUNCOMP RUNCMP Con't RIH with 41/2" completion from 4767' to 7511' 02:00 - 02:30 0.50 RUNCOMP RUNCMP Space out - PU 110 - SO 92 02:30 - 03:30 1.00 RUNCOMP RUNCMP CBU 1 X - 5 bpm @ 390 psi - Drop ball & rod - Pump ball on seat - Ball on seat pressure up to 1000 psi - Bleed off 03:30 - 04:30 1.00 RUNCOMP RUNCMP Land tubing - RILDS - Lay down landing joint - Test TWC to 1000 psi from above - test good Printed: 12/612004 9:20: 12 AM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: MPB-27 MPB-27 DRILL+COMPLETE DOYON DRILLING INC. DOYON 14 12/1/2004 04:30 - 05:30 1.00 BOPSUP P RUNCMP 05:30 - 07:00 1.50 WHSUR P RUNCMP 07:00 - 07:30 0.50 WHSUR P RUNCMP 07:30 - 08:00 0.50 WHSUR P RUNCMP 08:00 - 10:30: 2.50 WHSUR P RUNCMP 10:30 - 11 :30 1.00 WHSUR P RUNCMP 11 :30 - 13:00 1.50 WHSUR P RUNCMP 13:00 - 13:30 0.50 WHSUR P RUNCMP 13:30 - 14:00 0.50 WHSUR P RUNCMP Start: Rig Release: Rig Number: Spud Date: 11/20/2004 End: 12/1/2004 11/15/2004 12/1/2004 Nipple down BOP's Nipple up tubing head adapter and CIW 4-1/8" X 5M carbon tree. Pressure tested tubing head adapter and tree to 5000 psi for 10 minutes. Rig up lines to pressure test tubing and annulus. Pressure test tubing to 2000 psi for 30 minutes (lost 20 psi in 30 minutes). Leave 2000 psi on tubing and pressured annulus to 3500 psi. Lost 200 psi in 10 minutes and pressure on tubing increased to 3000 psi. Pressured up annulus to 3500 psi again. Pressure equalized with pressure in tubing at 3250 psi. Held pressure test for 30 minutes and recorded on chart. Appear to have small leak from annulus to tubing. Bled off tubing pressure and sheared DCK-2 valve with 2500 psi differential pressure. Bled off all pressure on well. Rigged up Hot Oil Truck and tested lines to 3000 psi. Pumped 88 bbls of diesel down annulus while taking returns up tubing. Pumped 3 bpm at 2000 psi. Hooked up tubinglannulus equalizing lines and let well equalize. Suck lines clear. Rigged down Hot Oil Truck and rigged down lines from tree. Rigged up lubricator and install BPV in tubing hanger. RD lubricator. Secure well (checked all valves on tree and wellhead). Recorded pressures (50 psi on tubing and lA, 100 psi on outer annulus). Released rig at 1400 hrs 12-01-2004. Printed: 12/6/2004 9:20: 12 AM . . Survey Ref: svy1506 Halliburton Sperry-Sun Milne Point Unit BPXA MPB-27 Job No. AKZZ3405887, Surveyed: 28 November, 2004 Survey Report 13 December, 2004 Your Ref: API 500292323300 v Surface Coordinates: 6023092.10 N, 571997.32 E (70028' 24.1468" N, 149024' 42.9370" W) Grid Coordinate System: NAD27 Alaska State Planes, Zone 4 Kelly Bushing Elevation: 56. 90ft above Mean Sea Level spe..........y-sul1 D A H"'C fN G seAVIr=es A Halliburton Company Halliburton Sperry-Sun Survey Report for MPB-27 Your Ref: API 500292323300 Job No. AKZZ3405887, Surveyed: 28 November, 2004 BPXA Milne Point Unit Measured True Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment (ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft) 0.00 0.000 0.000 -56.90 0.00 0.00 N 0.00 E 6023092.10 N 571997.32 E 0.00 CB-SS-GYRO 114.00 0.000 0.000 57.10 114.00 0.00 N 0.00 E 6023092.10 N 571997.32 E 0.000 0.00 170.00 0.600 147.000 113.10 170.00 0.25S 0.16 E 6023091.86 N 571997.48 E 1.071 0.25 261.00 0.800 128.000 204.09 260.99 1.04 S 0.92 E 6023091.07 N 571998.25 E 0.334 1.04 . 352.00 1.200 75.000 295.08 351.98 1.18 S 2.34 E 6023090.94 N 571999.67 E 1.057 1.18 443.00 2.100 53.000 386.04 442.94 0.07 N 4.59 E 6023092.21 N 572001.91 E 1.192 -0.07 535.00 3.150 35.000 477.95 534.85 3.15 N 7.39 E 6023095.33 N 572004.68 E 1 .438 -3.15 MWD+IIFR+MS 574.99 3.440 35.940 517.87 574.77 5.03 N 8.72 E 6023097.21 N 572005.99 E 0.738 -5.03 662.76 4.000 38.930 605.45 662.35 9.54 N 12.19 E 6023101.76 N 572009.42 E 0.675 -9.54 760.55 5.090 57.390 702.94 759.84 14.53 N 17.99 E 6023106.80 N 572015.17 E 1.852 -14.53 857.35 6.240 65.960 799.27 856.17 18.99 N 26.41 E 6023111.34 N 572023.55 E 1.472 -18.99 951.69 9.120 80.910 892.76 949.66 22.26 N 38.48 E 6023114.73 N 572035.58 E 3.691 -22.26 1047.08 10.980 83.950 986.68 1043.58 24.41 N 54.98 E 6023117.04 N 572052.06 E 2.027 -24.41 1144.38 13.910 86.630 1081.69 1138.59 26.08 N 75.88 E 6023118.91 N 572072.94 E 3.068 -26.08 1240.32 20.470 89.570 1173.29 1230.19 26.88 N 104.19 E 6023119.99 N 572101.25 E 6.895 -26.88 1336.16 23.890 90.970 1262.03 1318.93 26.68 N 140.37 E 6023120.13 N 572137.42 E 3.611 -26.68 1434.85 23.740 89.380 1352.32 1409.22 26.55 N 180.21 E 6023120.40 N 572177.27 E 0.668 -26.55 1528.19 23.770 90.690 1437.75 1494.65 26.53 N 217.81 E 6023120.74 N 572214.86 E 0.566 -26.53 1624.58 25.110 95.640 1525.51 1582.41 24.29 N 257.59 E 6023118.88 N 572254.67 E 2.538 -24.29 1720.58 25.480 97.980 1612.31 1669.21 19.42 N 298.32 E 6023114.40 N 572295.43 E 1.110 -19.42 1816.34 26.320 103.700 1698.46 1755.36 11.53 N 339.35 E 6023106.91 N 572336.54 E 2.752 -11.53 .. 1912.89 26.540 105.920 1784.92 1841.82 0.54 N 380.89 E 6023096.33 N 572378.18 E 1.048 -0.54 2009.14 28.030 109.250 1870.47 1927.37 12.81 S 422.92 E 6023083.38 N 572420.34 E 2.216 12.81 2105.21 30.020 113.780 1954.48 2011.38 29.95 S 466.23 E 6023066.66 N 572463.82 E 3.085 29.95 2201.08 34.960 116.560 2035.32 2092.22 51.92 S 512.78 E 6023045.15 N 572510.58 E 5.382 51.92 2281.33 37.140 118.240 2100.20 2157.10 73.66 S 554.69 E 6023023.81 N 572552.70 E 2.983 73.66 2377.33 38.890 121.380 2175.84 2232.74 103.07 S 605.96 E 6022994.89 N 572604.25 E 2.716 103.07 2473.48 41 .590 124.800 2249.24 2306.14 137.01 S 657.95 E 6022961.46 N 572656.56 E 3.628 137.01 2568.98 41 .920 127.260 2320.49 2377.39 174.42 S 709.37 E 6022924.55 N 572708.34 E 1.750 174.42 2663.71 46.820 127.350 2388.18 2445.08 214.56 S 762.04 E 6022884.93 N 572761.40 E 5.173 214.56 2758.39 53.580 129.190 2448.75 2505.65 259.62 S 819.08 E 6022840.41 N 572818.87 E 7.294 259.62 2854.82 58.560 131.730 2502.57 2559.47 311.56 S 879.90 E 6022789.07 N 572880.19 E 5.607 311.56 2948.89 63.370 134.350 2548.22 2605.12 367.70 S 939.95 E 6022733.51 N 572940.79 E 5.663 367.70 3043.74 67.910 135.090 2587.33 2644.23 428.49 S 1001.33 E 6022673.31 N 573002.74 E 4.839 428.49 3140.58 67.450 133.950 2624.11 2681.01 491.31 S 1065.20 E 6022611.12 N 573067.22 E 1.188 491.31 13 December, 2004 - 15:55 Page 2 of 6 DrillQuest 3.03.06.006 Halliburton Sperry-Sun Survey Report for MPB-27 Your Ref: API 500292323300 Job No. AKZZ3405887, Surveyed: 28 November, 2004 BPXA Milne Point Unit Measured True Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment (ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/10aft) 3235.40 67.110 133.700 2660.73 2717.63 551.87 S 1128.30 E 6022551.17 N 573130.90 E 0.433 551.87 3331.79 67.440 134.500 2697.97 2754.87 613.74 S 1192.14 E 6022489.92 N 573195.34 E 0.839 613.74 3427.54 65.510 133.840 2736.19 2793.09 674.91 S 1255.11 E 6022429.36 N 573258.90 E 2.112 674.91 3523.55 65.160 134.220 2776.25 2833.15 735.55 S 1317.84E 6022369.33 N 573322.21 E 0.512 735.55 . 3548.03 65.170 134.580 2786.53 2843.43 751.10S 1333.71 E 6022353.94 N 573338.23 E 1.335 751.10 3642.01 62.970 134.460 2827.63 2884.53 810.36 S 1393.97 E 6022295.27 N 573399.06 E 2.344 810.36 3737.89 63.180 134.570 2871 .04 2927.94 870.29 S 1454.93 E 6022235.92 N 573460.60 E 0.242 870.29 3833.90 63.350 133.510 2914.24 2971.14 929.90 S 1516.57 E 6022176.92 N 573522.81 E 1.002 929.90 3929.54 63.790 134.850 2956.81 3013.71 989.58 S 1577.98 E 6022117.83 N 573584.80 E 1.336 989.58 4025.58 65.160 135.210 2998.19 3055.09 1050.90 S 1639.23 E 6022057.11 N 573646.64 E 1 .466 1050.90 4121.70 63.790 135.780 3039.61 3096.51 1112.758 1700.03 E 6021995.84 N 573708.03 E 1.522 1112.75 4218.08 65.870 136.730 3080.60 3137.50 1175.77S 1760.34 E 6021933.41 N 573768.95 E 2.335 1175.77 4314.28 63.670 136.470 3121.60 3178.50 1238.99 S 1820.12 E 6021870.77 N 573829.34 E 2.300 1238.99 4410.10 65.590 136.320 3162.65 3219.55 1301.688 1879.83 E 6021808.66 N 573889.66 E 2.009 1301.68 4506.60 64.970 135.930 3203.01 3259.91 1364.878 1940.59 E 6021746.06 N 573951.02 E 0.740 1364.87 4603.07 65.420 136.730 3243.48 3300.38 1428.21 S 2001.05 E 6021683.31 N 574012.09 E 0.886 1428.21 4698.99 64.430 137.900 3284.13 3341.03 1492.078 2059.95 E 6021620.02 N 574071.61 E 1.512 1492.07 4794.50 64.010 137.260 3325.67 3382.57 1555.56 S 2117.97E 6021557.10 N 574130.24 E 0.747 1555.56 4891.57 68.190 137.780 3364.99 3421.89 1621.00 S 2177.88 E 6021492.24 N 574190.78 E 4.334 1621.00 4987.73 67.930 137.300 3400.92 3457.82 1686.81 S 2238.10 E 6021427.02 N 574251.63 E 0.536 1686.81 5084.40 67.190 136.720 3437.82 3494.72 1752.17 S 2299.02 E 6021362.26 N 574313.18 E 0.945 1752.17 . 5177.75 66.600 136.560 3474.45 3531.35 1814.59 S 2357.97 E 6021300.40 N 574372.73 E 0.651 1814.59 5274.41 66.610 135.910 3512.83 3569.73 1878.66 8 2419.33 E 6021236.93 N 574434.71 E 0.617 1878.66 5370.46 65.580 135.030 3551.75 3608.65 1941.268 2480.91 E 6021174.93N 574496.89 E 1.361 1941.26 5466.44 65.370 136.670 3591.60 3648.50 2003.91 S 2541.73 E 6021112.87 N 574558.32 E 1.570 2003.91 5562.63 64.410 134.870 3632.42 3689.32 2066.32 8 2602.48 E 6021051.05 N 574619.66 E 1.966 2066.32 5658.96 64.220 134.640 3674.17 3731.07 2127.448 2664.12 E 6020990.53 N 574681.90 E 0.292 2127.44 5753.27 63.380 134.000 3715.81 3772.71 2186.56 8 2724.66 E 6020932.00 N 574743.01 E 1.079 2186.56 5848.78 62.780 133.310 3759.05 3815.95 2245.35 S 2786.28 E 6020873.81 N 574805.19 E 0.900 2245.35 5943.80 63.720 135.960 3801.82 3858.72 2304.96 S 2846.64 E 6020814.78 N 574866.13 E 2.680 2304.96 6039.88 64.920 139.270 3843.47 3900.37 2368.92 S 2904.99 E 6020751.40 N 574925.09 E 3.346 2368.92 6134.79 64.560 139.060 3883.97 3940.87 2433.86 S 2961.12 E 6020687.00 N 574981.84 E 0.429 2433.86 6230.80 64.970 138.670 3924.90 3981.80 2499.27 S 3018.25 E 6020622.15 N 575039.60 E 0.563 2499.27 6327.04 65.250 139.250 3965.41 4022.31 2565.12 S 3075.57 E 6020556.86 N 575097.56 E 0.619 2565.12 6423.16 64.910 143.440 4005.92 4062.82 2633.17 S 3130.00 E 6020489.34 N 575152.65 E 3.969 2633.17 13 December, 2004 - 15:55 Page 3 of 6 Dril/Quest 3.03.06.006 Halliburton Sperry-Sun Survey Report for MPB-27 Your Ref: API 500292323300 Job No. AKZZ3405887, Surveyed: 28 November, 2004 BPXA Milne Point Unit Measured True Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment (ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft) 6519.05 63.730 146.490 4047.48 4104.38 2703.91 S 3179.62 E 6020419.08 N 575202.94 E 3.119 2703.91 6614.95 64.700 150.580 4089.21 4146.11 2777.54 S 3224.67 E 6020345.88 N 575248.70 E 3.971 2777.54 6659.31 65.240 154.750 4107.99 4164.89 2813.24 S 3243.11 E 6020310.36 N 575267.50 E 8.604 2813.24 6710.91 65.110 158.310 4129.66 4186.56 2856.19 S 3261.76 E 6020267.60 N 575286.56 E 6.267 2856.19 . 6751.51 64.640 160.740 4146.90 4203.80 2890.62 S 3274.62 E 6020233.29 N 575299.75 E 5.541 2890.62 6805.03 64.660 165.260 4169.82 4226.72 2936.86 S 3288.76 E 6020187.19 N 575314.33 E 7.632 2936.86 6850.78 64.350 170.120 4189.52 4246.42 2977.19 S 3297.56 E 6020146.95 N 575323.52 E 9.612 2977. 19 6901.07 63.040 173.410 4211.81 4268.71 3021.79 S 3304.02 E 6020102.41 N 575330.42 E 6.417 3021.79 6948.40 62.420 176.440 4233.50 4290.40 3063.69 S 3307.75 E 6020060.55 N 575334.55 E 5.839 3063.69 6997.45 63.480 179.940 4255.82 4312.72 3107.34 S 3309.12 E 6020016.91 N 575336.34 E 6.712 3107.34 7045.00 64.980 184.560 4276.50 4333.40 3150.11 S 3307.43 E 6019974.13 N 575335.07 E 9.300 3150.11 7094.18 65.990 188.800 4296.91 4353.81 3194.54 S 3302.22 E 6019929.65 N 575330.29 E 8.108 3194.54 7143.90 67.740 193.230 4316.45 4373.35 3239.40 S 3293.47 E 6019884.71 N 575321.98 E 8.917 3239.40 7189.71 69.400 198.420 4333.20 4390.10 3280.41 S 3281.84 E 6019843.59 N 575310.74 E 11.150 3280.41 7238.71 69.720 201.940 4350.32 4407.22 3323.49 S 3266.00 E 6019800.36 N 575295.32 E 6.763 3323.49 7285.74 69.390 203.460 4366.75 4423.65 3364.15 S 3249.00 E 6019759.54 N 575278.71 E 3.109 3364.15 7334.54 68.930 204.140 4384.11 4441.01 3405.87 S 3230.59 E 6019717.64 N 575260.71 E 1.608 3405.87 7381.64 69.000 203.300 4401.01 4457.91 3446.12 S 3212.91 E 6019677.22 N 575243.41 E 1.671 3446.12 7426.34 68.790 202.950 4417.11 4474.01 3484.47 S 3196.53 E 6019638.71 N 575227.41 E 0.869 3484.47 7478.37 70.260 203.320 4435.31 4492.21 3529.29 S 3177.38 E 6019593.71 N 575208.69 E 2.903 3529.29 7522.34 75.410 204.780 4448.28 4505.18 3567.64 S 3160.26 E 6019555.20 N 575191.94 E 12.134 3567.64 . 7573.21 81.700 206.020 4458.37 4515.27 3612.65 S 3138.88 E 6019509.98 N 575171.00 E 12.593 3612.65 7611.16 83.450 207.670 4463.27 4520.17 3646.23 S 3121.89E 6019476.24 N 575154.33 E 6.313 3646.23 7654.22 89.260 209.490 4466.01 4522.91 3683.95 S 3101.34 E 6019438.33 N 575134.15 E 14.136 3683.95 7706.11 90.000 209.650 4466.35 4523.25 3729.08 S 3075.73 E 6019392.95 N 575108.98 E 1 .459 3729.08 7754.78 90.120 212.900 4466.30 4523.20 3770.67 S 3050.47 E 6019351.12 N 575084.12 E 6.682 3770.67 7802.48 90.740 215.410 4465.94 4522.84 3810.14 S 3023.69 E 6019311.39 N 575057.72 E 5.420 3810.14 7850.48 90.120 218.680 4465.58 4522.48 3848.44 S 2994.78 E 6019272.81 N 575029.18 E 6.934 3848.44 7896.63 90.370 222.280 4465.38 4522.28 3883.54 S 2964.82 E 6019237.42 N 574999.57 E 7.819 3883.54 7945.79 90.800 224.950 4464.88 4521.78 3919.12 S 2930.92 E 6019201.51 N 574966.01 E 5.501 3919.12 7992.43 90.490 227.140 4464.35 4521.25 3951.49 S 2897.34 E 6019168.82 N 574932.75 E 4.742 3951.49 8040.13 89.810 226.170 4464.23 4521.13 3984.23 S 2862.66 E 6019135.74 N 574898.38 E 2.483 3984.23 8088.69 91.670 226.420 4463.60 4520.50 4017.78 S 2827.56 E 6019101.86 N 574863.61 E 3.865 4017.78 8136.58 91.420 225.820 4462.31 4519.21 4050.96 S 2793.05 E 6019068.34 N 574829.43 E 1.357 4050.96 8184.54 87.840 225.520 4462.62 4519.52 4084.47 S 2758.75 E 6019034.51 N 574795.45 E 7.491 4084.47 13 December, 2004 - 15:55 Page 4 of 6 DrillQuest 3.03.06.006 Milne Point Unit Measured True Sub-Sea Vertical Depth Incl. Azim. Depth Depth (ft) (ft) (ft) 8232.95 87.590 225.500 4464.55 4521.45 8280.59 87.780 225.890 4466.47 4523.37 8329.26 87.590 225.370 4468.44 4525.34 8376.57 84.560 223.760 4471.68 4528.58 8409.46 80.390 223.200 4475.98 4532.88 ... 8480.00 80.390 223.200 4487.76 4544.66 Halliburton Sperry-Sun Survey Report for MPB-27 Your Ref: API 500292323300 Job No. AKZZ3405887, Surveyed: 28 November, 2004 BPXA Local Coordinates Global Coordinates Dogleg Vertical Northings Eastings Northings Eastings Rate Section Comment (ft) (ft) (ft) (ft) (0/100ft) 4118.37 S 2724.24 E 6019000.28 N 574761.27 E 0.518 4118.37 4151.62S 2690.18 E 6018966.70 N 574727.53 E 0.910 4151.62 4185.62 S 2655.41 E 6018932.36 N 574693.10 E 1.137 4185.62 4219.25 S 2622.30 E 6018898.42 N 574660.31 E 7.249 4219.25 . 4242.90 S 2599.87 E 6018874.55 N 574638.11 E 12.790 4242.90 4293.60 S 2552.26 E 6018823.39 N - 574590.99 E 0.000 4293.60 Projected Survey All data is in Feet (US Survey) unless otherwise stated. Directions and coordinates are relative to True North. Vertical depths are relative to Well. Northings and Eastings are relative to Well. Global Northings and Eastings are relative to NAD27 Alaska State Planes, Zone 4. The Dogleg Severity is in Degrees per 100 feet (US Survey). Vertical Section is from Well and calculated along an Azimuth of 180.000° (True). Based upon Minimum Curvature type calculations, at a Measured Depth of 8480.00ft., The Bottom Hole Displacement is 4994.90ft., in the Direction of 149.271 ° (True). Comments Measured Depth (ft) Station Coordinates TVD Northings Eastings (ft) (ft) (ft) 8480.00 4293.60 S 2552.26 E Projected Survey 4544.66 13 December, 2004 - 15:55 Comment . Page 5 of 6 DrillQuest 3.03.06.006 Milne Point Unit Halliburton Sperry-Sun Survey Report for MPB-27 Your Ref: API 500292323300 Job No. AKZZ3405887, Surveyed: 28 November, 2004 BPXA Survey tool program for MPB-27 Fro m Measured Vertical Depth Depth (ft) (ft) 0.00 535.00 0.00 534.85 13 December, 2004 . 15:55 To Measured Vertical Depth Depth Survey Tool Description (ft) (ft) . 535.00 8480.00 534.85 CB-SS-GYRO 4544.66 MWD+IIFR+MS . Page 6 of 6 Dril/Quest 3.03.06.006 . . AOGCC Helen Warman 333 W. 7th Ave. Suite 100 Anchorage, AK 99501 DEFINITIVE Re: Distribution of Survey Data for Well MPB-27 Dear Dear Sir/Madam: Enclosed is one disk with the *.PTT and *.PDF files. Tie-on Survey: Window / Kickoff Survey: Projected Survey: 0.00' MD 0.00' MD 8,480.00' MD (if applicable) PLEASE ACKNOWLEDGE RECEIPT BY SENDING AN EMAIL TO CARL.ULRICH@HALLlBURTON.COM OR SIGNING AND RETURNING A COPY OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: Sperry-Sun Drilling Services Attn: Carl Ulrich 6900 Arctic Blvd. AnCh~~age, AK 99518 /) / j/ 0, I J I Date '2 7 .J rwvÌJ}¡J \ - Signed / r:J1-v,r ry;' I.l.di-j Please call me at 273-3545 if you have any questions or concerns. Regards, William T. Allen Survey Manager Attachment(s) 03-Jan-05 Z O\-l- ^ Á-. I . AOGCC Helen Warman 333 W. 7th Ave. Suite 100 Anchorage, AK 99501 . Re: Distribution of Survey Data for Well MPB-27 MWD Dear Dear Sir/Madam: Enclosed is one disk with the *.PTT and *.PDF files. Tie-on Survey: Window / Kickoff Survey: Projected Survey: 0.00' MD 0.00' MD 8,480.00' MD (if applicable) 03-Jan-05 PLEASE ACKNOWLEDGE RECEIPT BY SENDING AN EMAIL TO CARL.ULRICH@HALLlBURTON.COM OR SIGNING AND RETURNING A COPY OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: Sperry-Sun Drilling Services Attn: Carl Ulrich 6900 Arctic Blvd. Anchorage, AK 99518 0)) \ Date p< ~ trY'-tX M~- Signed ~ ðti.J ( Please call me at 273-3545 if you have any questions or concerns. Regards, William T. Allen Survey Manager Attachment(s) ~~ ÕY~)..;z.\ · . ~~fÆ~E (ill F fÆ~fÆ~ fÆ I / / I FRANK H. MURK OW SKI, GOVERNOR ~1,ASIiA ORAND GAS CONSERVATION COMMISSION 333 W. 1'" AVENUE, SUITE 100 ANCHORAGE, ALASKA 99501·3539 PHONE (907) 279-1433 FAX (907) 276-7542 Fred Johnson Senior Drilling Engineer BP Exploration (Alaska) Inc. P.O. Box 196612 Anchorage, Alaska 99519-6612 Re: Milne Point MPB-27 BP Exploration (Alaska) Inc. Permit No: 204-221 Surface Location: 5249' NSL, 4295' WEL, SEC. 19, T13N, RIlE, (As Staked) Bottomhole Location: 978' NSL, 1773' WEL, SEC. 19, T13N, RIlE, UM (OA) Dear Mr. Johnson: Enclosed is the approved application for permit to drill the above referenced service well. This permit to drill does not exempt you from obtaining additional permits or approvals required by law from other governmental agencies, and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the Commission reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the Commission specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or a Commission order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. Please provide at least twenty-four (24) hours notice for a representative of the Commission to witness any required test. Contact the Commission's petroleum field inspector at (907) 659- (pager). cc: ;"':,J, . STATE OF ALASKA . .. ·Ä[Ä~ OIL AND GAS CONSERVATION COMMISSION PERMIT TO DRILL 20 MC 25.005 r b. Current Well Cla(j Stratigraphic Test Ii ~~~?:tOry B g::~~~~~rg~s~~~~~~~~~;!c 5. Bond: 181 Blanket 0 Single Well 11. Well Namêand:p;jûffiber: Bond No. 2S100302630-277 MPB·27 6. Proposed Depth: I 12. Field I Pool(s): MD 8465'; TVD 4518' Milne Point Unit I Schrader Bluff 7. Property Designation: ADL 047438 t~<t pre-producQ~~~1J!tJ4llnjector B.Drill 1 a. Type of work 0 Re-Entry 2. Operator Name: BP Exploration (Alaska) Inc. 3. Address: P.O. Box 196612, Anchorage, Alaska 99519-6612 "4a. Location of Well (Governmental Section): Surface: 5249' NSL, 4295' WEL, SEC. 19, T13N, R11E, (As Staked) Top of Productive Horizon: 1611' NSL, 1178' WEL, SEC. 19, T13N, R11 E, UM (OA) Total Depth: / 978' NSL, 1773' WEL SEC. 19, T13N, R11E, UM (OA) 4b. Location of Well (State Base Plane Coordinates): Surface: x- 571997 r y- 6023092 ,/ Zone- ASP4 16. Deviated Wells: Kickoff Depth: 300 feet Maximum Hole Angle: 90 degrees 8. Land Use Permit: 9. Acres in Property: 2560 13. Approximate Spud Date: 11/12/04 14. Distance to Nearest Property: 2500' 10. KB Elevation 15. Distance to Nearest Well Within Pool (Height above GL): 57.8' feet 2100' away from MPB-13 17. Maximum Anticipated Pressures in psig (see 20 AAC 25.035) Downhole: 2036' Surface: 1585; 18......qa$ìr'lgprogram: Size Hole CasinQ WeiQht Grade CouplinQ LenQth MD TVD MD TVD (includinQ staQe data) 42" 20" 92# H-40 Welded 80' 34' 34' 114' 114' 260 sx Arctic Set (Approx.) 12-114" 9-518" 40# L-80 BTC 3564' 30' 30' 3594' 2868' 467 sx AS Lite, 213 sx Class 'G' 8-3/4" 7" 26# L-80 BTC-M 7566' 30' 30' 7596' 4507' 363 sx Class 'G' 6-1/8" 4-1/2" 12.6# L-80 IBT-M 965' 7500' 4498' 8465' 4518' Uncemented Slotted Liner PRE$ENT WI;LLCQNPITION$UMMARY (To ~completedf()r Rf3(.'J!'ÍIIANI;:) R~f3'1try Operations) Total Depth MD (ft): Total Depth TVD (ft): Plugs (measured): Effective Depth MD (ft): Depth TVD Junk (measured): Structural Conductor Surface Intermediate Production Liner 20. Attachments 181 Filing Fee, $100 0 BOP Sketch 181 Property Plat 0 Diverter Sketch IPerfOration Depth TVD (ft): 181 Drilling Program 0 Time vs Depth Plot o Seabed Report 181 Drilling Fluid Program o Shallow Hazard Analysis 18120 AAC 25.050 Requirements Date: Contact Skip Coyner. 564-4395 Perforation Depth MD (ft): 21. Verbal Approval: Commission Representative: 22. I hereby certify that the foregoing is true and correct to the best of my knowledge. Printed Name 6 ed Johnson Title Senior Drilling Engineer Phone 564-5427 Prepared By Name/Number: Sondra Stewman, 564-4750 Permit To Drill20~' i '. '7 II API Number: I Permit Approval I See cover letter for Number: ì' ~Z 50- o2ft- 2. .3 2. 33 - 00 Date: /1 ~ /0 C( other requirements Conditions of Approval: Samples Required 0 Yes ~No Mud Log Required 0 Yes ~o Hydrogen Sulfide Measures 0 Yes i8J No Directional Survey Required ~es 0 No , Other: ?:O'OO~\ ~\' e.":o ().c:.~\o.~<Ö. ~\)\>~.;A\C\..~f"""~\. ¿ ~4ðo.~.: \J\.\~~\<;\$J.~b0 CJ ~((:.'\t.)., , ~c.c{-Ð ~ I ~\() 10 ß c.o'XL~\()f',~\,,~t.<:.-\o, ~\J\~~ 0 ~~~t¡ >- APPROVED BY i~ It THE COMMISSION Date II / f)7 _ ¡ i k L S mi In Duplicate . bp . I Well Name: I MPB-27 Schrader Bluff: NB, NC, ND & OA Dual Injector IIPre-Produce (clean up) the OA Lateral" DmlingandCompœnonP~nSumma~ I Type of Well: Surface Location: (As Staked) Top NB Sand at 7160' MD Top OA Sand at 7596' MD (OA Heel) BHL at 8464' MD (OA Toe) Distance to Property line Distance to nearest well I AFE Number: 1 Estimated Start Date: 112 Nov 04 1 Schrader Bluff: Dual Injector 5249' FSL and 4295' FEL Section 19, T13N, R11 E UM E = 571,997' N = 6,023,092' 1996' FSL and 1029' FEL Section 19, T13N, R11 E UM E = 575,308' N = 6,019,872' Z = 4383' TVD 1611' FSL and 1178' FEL Section 19, T13N, R11 E UM E = 575,163' N = 6,019,486' Z = 4507' TVD 978' FSL and 1773' FEL / Section 19, T13N, R11 E UM / E = 574,578' N = 6,018,847' Z = 4518' TVD 2,500' 2,100' from MPB-13 I Rig: I Doyon 14 Rig days to complete: I 10 MD: I 8465' I TVD: 14518' 1 ( 1 Max Inc:1900 1 I KOP: 1300' I I KBE:157.8' Well Design: Dual Injector (OA horizontal & perforated N sands) Objective: Schrader Bluff "N" sands & OA sand 1 . Mud Program: 12-1/4" Surface Hole . 8.6-9.6 10 - 20 25-30 10-119.0-9.5 <6 <15 9.0-9.3 10 - 20 20 - 30 10 - 11 9.0 - 9.5 <6 <15 .I 8.8-9.3 8-15 20 - 28 10 - 11 9.0 - 9.5 <6 > 20000 Waste Disposal: NO ANNULAR INJECTION. Drill Cuttings taken to 05-4 disposal site Call the Pad 4 waste disposal site prior to truck leaving location so the site can be ready to unload waste. Exempt liquid wastes can be taken to DS-4 or Phillips KRU 1 R. Recommended Bit Program: 1 2 3 12.25 in 8.75 in 6.125 in Surf - 3,594' 3,594' -7,596' 7,596' - 8,465' 3,480' 4,002' 869' MXC1 1-1-7 FM3641 RR .75 - .90 .50 - .75 .30 - .50 450 - 600 400 - 550 250 - 300 CasinglTubing Program 42 in 20 in* 92# H-40 Welded 80' 34' 114' / 114' 12.25 in 9.625 in 40# l-80 BTC 3,594' 30' 3,564' / 2,868' 8.75 in 7.0 in 26# l-80 BTC-M 7,566' 30' 7,596' / 4,507' 6.125 in 4.5 in 12.6# l-80 IBT-M 965' 7,500' 8,465' / 4,518' Evaluation Program: 12-1/4" Section Open Hole: MWD/GR IFR/CASANDRA InSite 8-3/4" Section Open Hole: MWD/GR/RES/ABI IFR/CASANDRA Sperry InSite Cased Hole: GR / SCMT / CCl 6-1/8" Section Open Hole: MWD/GR/RES/ABI IFR/CASANDRA Sperry InSite 2 . Cement Program: Casing Size Basis Total Cement Volume: 417 bbl CasinQ Size Basis Total Cement Volume: 77.5 bbl . 9-5/8", 40#, L-80, BTC Surface Casing at 3,594' MD Excess from B/Permafrost to Surface = 150% over gauge hole. Use 40% excess below the B/Permafrost. Tail cement = 500' MD. 10 bbl water 25 bbl CW 100 75 bbl of .MudPush 371 bbl, 467 sx of Arctic Set Lite: 10.7 ppg and 4.44 ft~/sx 46 bbl, 213 sx "G" mixed at 15.8 Ib/gal & 1.21 ft~/sx Point BHST 45° F (estimated by Wash Spacer Lead Tail 7",26#, L-80, BTC-M Intermediate Casing at 7,596' MD Top of cement to be 500' MD above Ugnu sands: 40% excess. Shoe Joint = 85 ft TOC = 5,617' MD 5-bbl water 25 bbl CW 100 40 bbl of .MudPush 77.5 bbl, 363 sx "G" mixed at 15.8 Ib/gal & 1.20 ft~/sx BHST =80°F from SOR Wash Spacer Tail Temp Formation Markers: Formation Tops MD TVD Pore Pressure EMW (ft) (ft) (psi) (Ib/gal) BPRF 2,101 2,008 847 8.35 TUZC 6,117 3,938 1685 8.35 Ugnu-MA 6,637 4,163 1782 8.35 Ugnu-MB1 6,671 4,179 1789 8.35 Ugnu-MB2 6,739 4,209 1802 8.35 Ugnu-MC 7,045 4,339 1858 8.35 SBF2-NA 7,095 4,358 1968 8.80 SBF1-NB 7,161 4,383 1979 8.80 SBE4-NC 7,227 4,409 2991 8.80 SBE2-NE 7,308 4,438 2004 8.80 SBE1-NF 7,403 4,473 2036 8.80 Heel-Top OA 7,596 4,507 2036 8.80 PTD - Mid-point OA 4,518 Well Control: Intermediate/Production hole: · Maximum anticipated BHP: · Maximum surface pressure: · Planned BOP test pressure: · Integrity tests: Kick tolerance: · Planned completion fluid: 2,036 psi at 4,508' TVO (Top of the OA sand) 1,585 psi at (Based on a full column of gas at 0.1 psi/ft) . 3,000 psi ~ FIT to 11.3 Ib/gal 20' below the 9-5/8" shoe. 50-bbl with 9.0 Ib/gal mud at below the 9-5/8" shoe. Kill Weight Brine with diesel cap. 3 . . Drilling Hazards & Contingencies: · Hydrates have not been reported on B-Pad however nearby pads have seen hydrates to 3000'. · Tight hole and stuck pipe due to clays and poor hole cleaning have occurred on B Pad wells. · The Schrader Bluff sands underlying B Pad are expected to be slightly depleted. Lost Circulation · We do not expect losses while drilling this well if there is good hole cleaning. · Losses are possible in the OA lateral while drilling and running the liner. If seepage and/or losses occur, follow the LOST CIRCULATION DECISION MATRIX in the well plan. Break circulation slowly in all instances and get up to recommended circulating rate slowly prior to cementing. Condition the mud before POOH to run casing/liner and watch surge pressures. Expected Pressures · The Schrader Bluff sands;?:cre xpected to be normally pressured: 8.7 ppg. · Due to production from M8 OA, reservoir pressure could be depleted to ~ 7.0 ppg EMW. t:" ~Þ.l Pad Data Sheet w - zg . è7-f · Please Read the B-Pad Data Sheet thoroughly. Breathing Hazards · None expected, however, some H2S has been detected from wells on the pad (see below). · Appropriate precautions will be employed while drilling (ie: wind socks, H2S detectors, etc.) Hydrocarbons · Hydrocarbons will be encountered in the Ugnu through the Schrader Bluff. Faults · One (1) fault is mapped in the surface hole section at ± 2986' MD. · One (1) fault may be cut in the OA lateral at ± 7950' MO Hydrogen Sulfide · MPB Pad is not designated as an H2S Pad, however, low concentrations of H2S has been detected from Kuparuk wells on the pad: MPB-03 MPB-04A MPB-06 The highest concentration of H2S on MPB: MPB-03 28 ppm 9ppm 5ppm 41 ppm 9/2004 9/2004 9/2004 3/2001 Anti-collision Issues · MPB-27i passes the Major Risk Criteria in the main wellbore and the OA lateral. Gyro surveys will be required for close approach issues and magnetic interference down to ± 1000 ft MD. Distance to Nearest Property · MPB-27i is 2,500 ft from the nearest Milne Point property line. Distance to Nearest Well Within Pool · MPB-27i is 2,100 ft from the nearest Schrader Bluff sand penetration in MPB-13. 4 · . DRILL & COMPLETION PROCEDURE Pre-RiQ Operations 1. The 20" conductor will be installed pre-rig. Drillina: 1. MIRT and NU Diverter. 2. Function Test Diverter, PU 4" DP and BHA. 3. Drill 12.25" surface hole. 4. Run and cement 9.625" surface casing. 5. ND diverter, install wellhead and NUfTest BOPE. 6. Drill 8.75" intermediate hole to the OA sand. 7. Run and cement 7" intermediate casing at T/OA. 8. Drill 6-1/8" OA lateral with FloPro mud. 9. Run a 4.5" slotted liner with HGR, ZXP & PBR. 10. Displace the well with kill weight brine. lDDP. 11. Run a GR 1 SCMT 1 CCl on E-Line. V 12. Run a 4-1/2" temporary, jet pump completion and sting into the PBR. 13. ND BOP/NU Tree. 14. Freeze Protect. 15. RD & MO Doyon 14. T~~ öf~" ~ Post-Ria: 1. Produce (clean up) the AO lateral to tanks with jet pump. 2. Pull the jet pump and catch PVT oil samples, etc. as directed. ~Completion (Duallniector): ......------.- 1. MI & RU Nabors 4ES. 2. Circulate kill weight brine as required. T\ ...... ~~\~ ~\ÇtS 3. ND Tree. NU & test BOP's ì'.. \ <;~' { V 4. UD the 4-1/2" temporary completion. c.. <¡" '-.J NJ"-{ " ØJII I 5. R/U E-Line. Perforate the NB, NC, ND sands as directed. ;'0/'" V v¡ 6. Run the dual tubing strings and dual packer as programmed. ¡t1Y', 7. Sting into the PBR, space out and set and test the dual packer. ¡f)h C'/ 8. ND BOP/NU Tree. ,¿-þ 9. Freeze Protect. 10. RD & MO Nabors 4ES ~ 5 .Ïi "Üi._).'ii I . . " .. I I " I f ~ , ! S' I, - ~ :. ~ I tl L.." 'IV fiIfA.... SÆ ~\ '..~. -"" q .,51; t 1121 I, .IAI .. f . " w : --+ I ~~.. ø .~ 51 , "" .. ¡ ~\ -?ii.I: . It. I """"J " .'1" j aM : . '11 " '1, .. II ~ 'If ~~t1W ~. .. 10W ,.u.r ;; ..- ·':f~, ~...""~ ..~.~ ...""~ ø-J .... II: I :\II t,ij 11"__ +._ / - :z. GEOOEnC COOIPINA_ ARE NAÐ W. 3. PAD SCALE FAQ'Œ II 0..._05117. 4. $. J. Î ï, -.II {..t .i ; ~ -N- I JIf_. . , ~TV MAP R:fa f t ~'lilïÙ_ ,- . " . ' ~~ 1'~~¡.~fXìR~ Ii 'If. IM~ ~_~::~::_;n:_:_::__~::. ".:.:_~:~: '-*- AUIi!IIQN ,. ( ~ øm " ~t~) 'U ~m<J4. .. 01-00;' '_MIl . ~ .--.. UYAT MERfIlAN. AlA5I<A . SECtiON OfTSEm ").'it' 1.1 IIIIIIIIIIIIII COMPANY DETA1L':ì Pian: MPB-27 wp05 (Plan MPB-27tMPB~27) Created By: Troy Jakabosky Date: 10/14/2004 SURVEY PROGRAM Depth Fm Depth To SUl'veyiPlaz¡ 3430 j l{)O.oo 1100.00 8"465.46 Tool BPA!I:IJ;J¢Q Date CB.QYRQ..SS MWD+IFR+MS Checked; Date Reviewed: CASillO DETAILS No. TVD MD Name Size 2588,70 2946.11 9.625 4506.90 7596.00 7.000 4517.79 8465.00 112" 4.500 FORMA nON TOP DETAILS No. TVDPath MDPath Formation I 2007.80 2100.57 2 3937.80 6117.17 3 4162.80 6637.15 4 4177.80 6670.90 5 4207.80 6738.63 6 4337.80 7044.71 7 4357.80 7095.26 8 4382.80 7160.62 9 4407.80 7227.48 10 4437.80 7308.3 I 11 44n80 7403.4 1 12 4506.90 7596.47 WELL DETAILS """" +N/·S +E!·W -. ""ling L_ Longìtude Slot PJ¡¡DMPß-.27 1:541.61 236.77 602309:2.17 571997A2 70~28'24.147N 14JY>24'42.934W >VA TARGET DETAILS Name TVD +NI-S +EI·W Northing Easting Shape MPB-27 T! Top NB 4382.80 -3252.00 3280.00 6019872.35 575308.41 Point MPB-27 T2 Top OA 4506.90 -3636.90 3131.30 6019486.07 575163.46 Point MPB-27 T3 Mid OA 4507.80 -3815.26 2996.78 60 I 9306.43 575030.68 Point MPB-27 T4 Mid OA 4517.80 -4270.34 2539.63 6018847.00 574578.00 Point "¡¡" :¡:¡ g æ. ! -¡¡ '" t " :> " ¡; .... 300' MD, 3oo'TVD 4%.7' MD, 4%.66'TVD See MD Inc Ax; TVD +NI·g +EI-W DLeg TFace VSec Target 1 0.00 0.00 2 0.00 0.00 3 1.69 1.00 4 156.54 2.00 5 427.52 3.00 6 483..07 0.00 7 948,66 4.00 8 961.32 0.00 9 1029.3 I 4.00 !O 3076,99 0.00 II 3280.00 6.00 MPB-27 T! Top NB 12 3251.04 6.00 13 3219,27 0.00 14 3131.30 12.00 MPB-271'2 Top OA 15 3115.28 0.00 16 2996.78 6,00 MPB-27 T3 Mid OA 17 2977,13 6,00 18 / 2539.63 0.00 MPB-27 T4 Mid OA Stmt Dir 31100' : 13%.7' MD, 1378.65'TVD : 2041.TMD, 1958.55'TVD : 2946.02' MD, 2588.65' TVD 6323.01' MD, 4025.09'TVD MPB-27 TI Top NB End!)ír : 7281.91' MD,4428.03' TVD / Start Dir 121lüO' : 7387.84' MD, 4467.24'TVD 4000 II ¡ 11 ¡ COMPANY DETAILS REFERENCE fNFORMA nON SURVEY PROGRAM BP Amooo Depth Fm Depth To Survey/Plan To. Created By: Troy Jakabo$ky Date: 1O!l4!20Q4 3430 1100.00 ) ;B Cheeked: Date:_ JlOO.OO 8465.46 ) "' WELL DETAILS .....~... i: N"", -,.-Nt-S +Ei-W Nonbing Easring Latitude Longitude SID! f i PlanMPB-27 1$41.61 236,77 6023092.17 571991.42 i0"28'24.!47N !49b24'42.934\\' NJA : TARGET DETAILS - i .. Name TVD +N/-S +E/-W Northing Easting Shape ! ..... f· ¡. i ....... M ()- ~ M ..... M i M .....- M ¿if In .............. M -- M ... M j' b ........ - 'f'f';; "" SECTION DETAILS - ... . i +- ". .... f'. - 'i- Sec MD rne Azi TVD +N/-S +E/-W DLeg TFace VSec Target - l' 1 :ci:~ ~ - ~:i; ffT .. iT 2 - ... 3 i6.? - .. 4 i :n - .. f ; .... ... S - () ~9j¿: i .. . .. 7 - '. S - .. 9 t t--- 10 ~ '\ '. ¡¡ MPB-27 Tl Top NB - ... 12 " ~t~Ö'i< 13 ~ - , 14 MPB-27 T2 Top OA 0 - .. IS 0 - f\, 16 ¿ MPB-27 T3 Mid OA '" +" - .. 'if., 17 ~ - ... IS 8 6 .. MPB-27 T4 Mid OA " - .. ',." .... ~ - : i" g - , i ~ "~" ...... " = '" i ........ ....... i, '.' .,- ·i ...... ·i· I -o+vv Y3 CASING DETAILS p' fI' lir No. TVD MD Name Size , " 1 7 >" 2 3 4 112" ! ,if - -4000 )ETAILS - I" ,'j No. Formatîon lilio' - j- , - M'B I - i, fe, , , , , " 0 800 1600 . . BP BP Planning Report Principal: Yes Plan: MPB-27 wp05 Date Composed: Version: Tied-to: 9/1612004 60 From: Definitive Path Field: Milne Point North Slope UNITED STATES Map System: US State Plane Coordinate System 1927 Geo Datum: NAD27 (Clarke 1866) Sys Datum: Mean Sea Level Site: M PI B Pad TR-13-11 UNITED STATES: North Slope Site Position: Northing: From: Map Easting: Position Uncertainty: 0.00 ft Ground Level: 0.00 ft WeD: Plan MPB-27 Map Zone: Coordinate System: Geomagnetic Model: Alaska, Zone 4 Well Centre bggm2004 6021548.49 ft 571775.55 ft Latitude: 70 28 Longitude: 149 24 North Reference: Grid Convergence: 8.986 N 49.895 W True 0.55 deg Slot Name: Well Position: +N/-S 1541.61 ft Northing: 6023092.17 ft Latitude: +EI-W 236.77 ft Easting : 571997.42 ft Longitude: Position Uncertainty: 0.00 ft Casing Points 2946.11 2588.70 9.625 12.250 9 5/8" 7596.00 4506.90 7.000 8.500 .,. 8465.00 4517.79 4.500 6.125 4 1/2" Formations 2100.57 6117.17 6637.15 6670.90 6738.63 7044.71 7095.26 7160.62 7227.48 7308.31 7403.41 7596.47 Targets 2007.80 3937.80 4162.80 4177.80 4207.80 4337.80 4357.80 4382.80 4407.80 4437.80 4472.80 4506.90 0.00 0.00 70 28 24.147 N 149 24 42.934 W BPRF TUZC Ugnu-MA Ugnu-MB1 Ugnu-MB2 Ugnu-MC SBF2-NA SBF1-NB SBE4-NC SBE2-NE SBE1-NF TSBD-Top OA TSBC-Base OA Formation 15 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 MPB-27 Fault 1 2607.80 456.82 1041.15 6023559.00 573034.00 70 28 28.639 N 149 24 12.321 W -Polygon 1 2607.80 456.82 1041.15 6023559.00 573034.00 70 28 28.639 N 149 24 12.321 W -Polygon 2 2607.80 -2310.04 470.30 6020787.00 572490.00 70 28 1.429 N 149 24 29.111 W -Plan out by 843.54 at 2607.80 -384.03 973.85 6022717.61 572974.85 70 28 20.370 N 149 24 14.303 W MPB-27 T1 Top NB 4382.80 -3252.00 3280.00 6019872.35 575308.41 70 27 52.158 N 149 23 6.539 W -Plan hit target MPB-02A poly 4506.80 -3648.43 2764.68 6019471.00 574797.00 70 27 48.261 N 149 23 21.688 W -Polygon 1 4506.80 -3648.43 2764.68 6019471.00 574797.00 70 27 48.261 N 149 23 21.688 W -Polygon 2 4506.80 -4173.64 2055.50 6018939.00 574093.00 70 27 43.098 N 149 23 42.533 W -Polygon 3 4506.80 -4509.21 2523.32 6018608.00 574564.00 70 27 39.796 N 149 23 28.790 W -Polygon 4 4506.80 -3935.04 3133.96 6019188.00 575169.00 70 27 45.441 N 149 23 10.840 W Company: Field: Site: WeD: Wellpath: Targets Name BPAmoco Milne Point MPtBPad Plan MPB-27 MPB-27 -Polygon 5 -Polygon 6 MPB-27 T2 Top OA MPB-27 T3 Mid OA MPB-27 Fault 2 -Polygon 1 -Polygon 2 MPB-27 Fault 3 -Polygon 1 -Polygon 2 MPB-27 T4 Mid OA Plan Section Information MD ft 34.30 300.00 496.70 1396.70 2041.70 2151.02 2946.02 2966.02 3073.63 6323.01 7160.62 7281.91 7387.84 7596.47 7626.69 7820.34 7848.43 8465.46 Survey MD ft 34.30 100.00 200.00 300.00 400.00 496.70 500.00 600.00 700.00 800.00 900.00 1000.00 1100.00 1200.00 1300.00 100 (leg 0.00 0.00 1.97 19.19 33.22 33.22 61.08 61.08 64.91 64.91 68.00 68.28 68.28 89.77 89.77 89.77 89.10 89.10 Inel (leg 0.00 0.00 0.00 0.00 1.00 Description Dip. Dir. AZbn (leg 0.00 0.00 30.00 80.35 111.94 111.94 133.69 133.69 135.91 135.91 191.00 198.84 198.84 212.00 212.00 223.62 225.16 225.16 AZbn deg 0.00 0.00 0.00 0.00 30.00 1.97 2.01 3.58 5.44 7.37 9.33 11.31 13.29 15.28 17.27 . TVD ft 34.30 300.00 496.66 1378.65 1958.55 2050.00 2588.65 2598.32 2647.18 4025.09 4382.80 4428.03 4467.24 4506.90 4507.02 4507.80 4508.08 4517.80 TVD ft 34.30 100.00 200.00 300.00 399.99 30.00 31.55 58.25 67.80 72.43 496.66 499.96 599.84 699.53 798.90 897.84 996.21 1093.91 1190.82 1286.81 75.13 76.90 78.15 79.07 79.79 BP BP Planning Report 1M) ft 4506.80 4506.80 4506.90 4507.80 4512.80 4512.80 4512.80 4512.80 4512.80 4512.80 4517.80 +N/-S ft -3175.65 -3069.42 -3636.90 -3815.26 -3736.82 -3736.82 -4108.47 -4163.29 -4163.29 -4822.58 -4270.34 +N/-S ft 0.00 0.00 2.92 41.42 -7.27 -29.65 -359.87 -371.96 -439.53 -2553.02 -3252.00 -3360.67 -3453.80 -3636.90 -3662.53 -3815.26 -3835.33 -4270.34 Sys 1M) ft -23.50 42.20 142.20 242.20 342.19 438.86 442.16 542.04 641.73 741.10 840.04 938.41 1036.11 1133.02 1229.01 . Date: 10114/2004 Time: 16:22:12 Page: Co-ordinate(NE)Re ence: Well: Plan MPß...27, True North Vertical (fVD) 23.5 + 34.3 57.8 Section (VS) Reference: Well (O.OON,0.OOE,180.00Azi) Survey Calculation Method: Minimum CUrvature Db: Oracle +FJ-W ft 3518.36 3289.35 3131.30 2996.78 2080.73 2080.73 3383.32 1916.58 1916.58 2970.35 2539.63 +FJ-W ft 0.00 0.00 1.69 156.54 427.52 483.07 948.66 961.32 1029.31 3076.99 3280.00 3251.04 3219.27 3131.30 3115.28 2996.78 2977.13 2539.63 NIS ft 0.00 0.00 0.00 0.00 0.76 2.92 3.02 6.16 9.59 13.32 17.33 21.64 26.22 31.08 36.21 Map Northing ft 6019951.00 6020055.00 6019486.07 575163.46 6019306.43 575030.68 6019376.00 574114.00 6019376.00 574114.00 6019017.00 575420.00 6018948.00 573954.00 6018948.00 573954.00 6018299.00 575014.00 6018847.00 574578.00 Map Eastlng ft 575546.00 575316.00 <-- Latitude --> . ~LOngitøde ---> Deg Min See Deg Min See 70 27 52.908 N 149 22 59.533 W 70 27 53.953 N 149 23 6.262 W 70 27 48.373 N 70 27 46.619 N 70 27 47.394 N 70 27 47.394 N 70 27 43.734 N 70 27 43.200 N 70 27 43.200 N 70 27 36.713 N 70 27 42.145 N DLS BuDd Tum deg/100ft deg/100ft deg/100ft 0.00 0.00 1.00 2.00 3.00 0.00 4.00 0.00 4.00 0.00 6.00 6.00 0.00 12.00 0.00 6.00 6.00 0.00 FJW ft 0.00 0.00 0.00 0.00 0.44 1.69 1.75 5.32 12.36 22.86 36.82 54.20 75.00 99.19 126.74 0.00 0.00 1.00 1.91 2.17 0.00 3.51 0.00 3.56 0.00 0.37 0.23 0.00 10.30 10.30 0.00 -2.40 0.00 DLS deg/100ft 0.00 0.00 0.00 0.00 1.00 1.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 0.00 0.00 0.00 5.59 4.90 0.00 2.74 0.00 2.06 0.00 6.58 6.46 0.00 6.31 6.31 6.00 5.50 0.00 MapN ft 6023092.17 6023092.17 6023092.17 6023092.17 6023092.93 6023095.11 6023095.21 6023098.38 6023101.88 6023105.71 6023109.86 6023114.33 6023119.11 6023124.21 6023129.60 TFO (leg 0.00 0.00 30.00 55.00 60.00 0.00 38.00 0.00 27.78 0.00 98.55 89.29 0.00 32.56 0.00 90.01 113.60 0.00 Target 149 23 10.914 W 149 23 14.870 W 149 23 41.788 W 149 23 41.788 W 149 23 3.515 W 149 23 46.615 W 149 23 46.615 W 149 23 15.658 W 149 23 28.308 W MPB-27 T1 Top NB MPB-27 T2 Top OA MPB-27 T3 Mid OA MPB-27 T4 Mid OA ~E ft 571997.42 571997.42 571997.42 571997.42 571997.85 571999.08 571999.14 572002.68 572009.68 572020.15 572034.06 572051.41 572072.16 572096.30 572123.79 Tool/Comment CB-GYRO-SS CB-GYRO-SS CB-GYRO-SS Start Dir 1/100 CB-GYRO-SS Start Dir 2/100 CB-GYRO-SS CB-GYRO-SS CB-GYRQ-SS CB-GYRQ-SS CB-GYRO-SS CB-GYRO-SS MWD+IFR+MS MWD+IFR+MS MWD+IFR+MS . . BP BP Planning Report Survey 1396.70 19.19 80.35 1378.65 1320.85 41.42 156.54 2.00 6023135.10 572153.53 Start Dir 31100 1400.00 19.24 80.61 1381.76 1323.96 41.60 157.61 3.00 6023135.29 572154.60 MWD+IFR+MS 1500.00 20.91 87.89 1475.70 1417.90 44.94 191.71 3.00 6023138.96 572188.66 MWD+IFR+MS 1600.00 22.84 94.06 1568.51 1510.71 44.23 228.91 3.00 6023138.61 572225.87 MWD+IFR+MS 1700.00 24.97 99.28 1659.94 1602.14 39.45 269.10 3.00 6023134.21 572266.10 MWD+IFR+MS 1800.00 27.25 103.70 1749.73 1691.93 30.62 312.19 3.00 6023125.80 572309.27 MWD+IFR+MS 1900.00 29.66 107.47 1837.65 1779.85 17.76 358.05 3.00 6023113.39 572355.24 MWD+IFR+MS 2000.00 32.15 110.72 1923.45 1865.65 0.92 406.55 3.00 6023097.02 572403.90 MWD+IFR+MS 2041.70 33.22 111.94 1958.55 1900.75 -7.27 427.52 3.00 6023089.03 572424.95 End Dir : 2041 2100.00 33.22 111.94 2007.32 1949.52 -19.21 457.15 0.00 6023077.39 572454.69 MWD+IFR+MS 2100.57 33.22 111.94 2007.80 1950.00 -19.32 457.44 0.00 6023077.27 572454.98 BPRF 2151.02 33.22 111.94 2050.00 1992.20 -29.65 483.07 0.00 6023067.20 572480.71 Start Dir 4/100 2200.00 34.78 114.05 2090.61 2032.81 -40.35 508.28 4.00 6023056.74 572506.02 MWD+IFR+MS 2300.00 38.07 117.89 2171.07 2113.27 -66.41 561.59 4.00 6023031.20 572559.58 MWD+IFR+MS 2400.00 41.47 121.19 2247.93 2190.13 -97.99 617.19 4.00 6023000.16 572615.47 MWD+IFR+MS 2500.00 44.95 124.07 2320.82 2263.02 -134.94 674.80 4.00 6022963.77 572673.43 MWD+IFR+MS 2600.00 48.49 126.62 2389.37 2331.57 -177.08 734.13 4.00 6022922.21 572733.16 MWD+IFR+MS 2700.00 52.09 128.90 2453.26 2395.46 -224.21 794.90 4.00 6022875.68 572794.38 MWD+IFR+MS 2800.00 55.72 130.97 2512.17 2454.37 -276.10 856.82 4.00 6022824.40 572856.79 MWD+IFR+MS 2900.00 59.39 132.87 2565.81 2508.01 -332.48 919.58 4.00 6022768.63 572920.09 MWD+IFR+MS 2946.02 61.08 133.69 2588.65 2530.85 -359.87 948.66 4.00 6022741.53 572949.42 End Dir : 2946 2946.11 61.08 133.69 2588.70 2530.90 -359.93 948.72 0.00 6022741.47 572949.48 95/8" 2966.02 61.08 133.69 2598.32 2540.52 -371.96 961.32 0.00 6022729.56 572962.20 Start Dir 4/1 00 2985.83 61.79 134.11 2607.80 2550.00 -384.03 973.85 4.00 6022717.61 572974.85 MPB-27 Fault 1 3000.00 62.29 134.41 2614.44 2556.64 -392.77 982.82 4.00 6022708.97 572983.90 MWD+IFR+MS 3073.63 64.91 135.91 2647.18 2589.38 -439.53 1029.31 4.00 6022662.68 573030.84 End Dir : 3073 3100.00 64.91 135.91 2658.36 2600.56 -456.68 1045.93 0.00 6022645.67 573047.62 MWD+IFR+MS 3200.00 64.91 135.91 2700.77 2642.97 -521.72 1108.95 0.00 6022581.25 573111.26 MWD+IFR+MS 3300.00 64.91 135.91 2743.17 2685.37 -586.77 1171.96 0.00 6022516.82 573174.89 MWD+IFR+MS 3400.00 64.91 135.91 2785.58 2727.78 -651.81 1234.98 0.00 6022452.40 573238.53 MWD+IFR+MS 3500.00 64.91 135.91 2827.99 2770.19 -716.85 1298.00 0.00 6022387.97 573302.17 MWD+IFR+MS 3600.00 64.91 135.91 2870.39 2812.59 -781.89 1361.02 0.00 6022323.55 573365.81 MWD+IFR+MS 3700.00 64.91 135.91 2912.80 2855.00 -846.94 1424.03 0.00 6022259.13 573429.44 MWD+IFR+MS 3800.00 64.91 135.91 2955.20 2897.40 -911.98 1487.05 0.00 6022194.70 573493.08 MWD+IFR+MS 3900.00 64.91 135.91 2997.61 2939.81 -977.02 1550.07 0.00 6022130.28 573556.72 MWD+IFR+MS 4000.00 64.91 135.91 3040.01 2982.21 -1042.07 1613.09 0.00 6022065.85 573620.36 MWD+IFR+MS 4100.00 64.91 135.91 3082.42 3024.62 -1107.11 1676.10 0.00 6022001.43 573684.00 MWD+IFR+MS 4200.00 64.91 135.91 3124.82 3067.02 -1172.15 1739.12 0.00 6021937.00 573747.63 MWD+IFR+MS 4300.00 64.91 135.91 3167.23 3109.43 -1237.20 1802.14 0.00 6021872.58 573811.27 MWD+IFR+MS 4400.00 64.91 135.91 3209.63 3151.83 -1302.24 1865.16 0.00 6021808.15 573874.91 MWD+IFR+MS 4500.00 64.91 135.91 3252.04 3194.24 -1367.28 1928.17 0.00 6021743.73 573938.55 MWD+IFR+MS 4600.00 64.91 135.91 3294.44 3236.64 -1432.33 1991.19 0.00 6021679.31 574002.18 MWD+IFR+MS 4700.00 64.91 135.91 3336.85 3279.05 -1497.37 2054.21 0.00 6021614.88 574065.82 MWD+IFR+MS 4800.00 64.91 135.91 3379.25 3321.45 -1562.41 2117.23 0.00 6021550.46 574129.46 MWD+IFR+MS 4900.00 64.91 135.91 3421.66 3363.86 -1627.46 2180.24 0.00 6021486.03 574193.10 MWD+IFR+MS 5000.00 64.91 135.91 3464.06 3406.26 -1692.50 2243.26 0.00 6021421.61 574256.73 MWD+IFR+MS 5100.00 64.91 135.91 3506.47 3448.67 -1757.54 2306.28 0.00 6021357.18 574320.37 MWD+IFR+MS 5200.00 64.91 135.91 3548.87 3491.07 -1822.58 2369.30 0.00 6021292.76 574384.01 MWD+IFR+MS 5300.00 64.91 135.91 3591.28 3533.48 -1887.63 2432.31 0.00 6021228.34 574447.65 MWD+IFR+MS 5400.00 64.91 135.91 3633.68 3575.88 -1952.67 2495.33 0.00 6021163.91 574511.29 MWD+IFR+MS 5500.00 64.91 135.91 3676.09 3618.29 -2017.71 2558.35 0.00 6021099.49 574574.92 MWD+IFR+MS 5600.00 64.91 135.91 3718.49 3660.69 -2082.76 2621.36 0.00 6021035.06 574638.56 MWD+IFR+MS 5700.00 64.91 135.91 3760.90 3703.10 -2147.80 2684.38 0.00 6020970.64 574702.20 MWD+IFR+MS . . BP BP Planning Report Survey 5800.00 64.91 135.91 3803.30 3745.50 -2212.84 2747.40 0.00 6020906.21 574765.84 MWD+IFR+MS 5900.00 64.91 135.91 3845.71 3787.91 -2277.89 2810.42 0.00 6020841.79 574829.47 MWD+IFR+MS 6000.00 64.91 135.91 3888.11 3830.31 -2342.93 2873.43 0.00 6020777.36 574893.11 MWD+IFR+MS 6100.00 64.91 135.91 3930.52 3872.72 -2407.97 2936.45 0.00 6020712.94 574956.75 MWD+IFR+MS 6117.17 64.91 135.91 3937.80 3880.00 -2419.14 2947.27 0.00 6020701.88 574967.68 TUZC 6200.00 64.91 135.91 3972.92 3915.12 -2473.02 2999.47 0.00 6020648.52 575020.39 MWD+IFR+MS 6300.00 64.91 135.91 4015.33 3957.53 -2538.06 3062.49 0.00 6020584.09 575084.03 MWD+IFR+MS 6323.01 64.91 135.91 4025.09 3967.29 -2553.02 3076.99 0.00 6020569.27 575098.67 Start Dir 6/1 00 6400.00 64.31 140.98 4058.12 4000.32 -2605.04 3123.11 6.00 6020517.70 575145.29 MWD+IFR+MS 6500.00 63.79 147.63 4101.91 4044.11 -2678.00 3175.55 6.00 6020445.26 575198.43 MWD+IFR+MS 6600.00 63.59 154.32 4146.27 4088.47 -2756.32 3219.02 6.00 6020367.38 575242.65 MWD+IFR+MS 6637.15 63.59 156.80 4162.80 4105.00 -2786.61 3232.79 6.00 6020337.23 575256.71 Ugnu-MA 6670.90 63.63 159.06 4177.80 4120.00 -2814.62 3244.14 6.00 6020309.33 575268.33 Ugnu-MB1 6700.00 63.69 161.01 4190.71 4132.91 -2839.13 3253.04 6.00 6020284.91 575277.47 MWD+IFR+MS 6738.63 63.82 163.59 4207.80 4150.00 -2872.13 3263.58 6.00 6020252.01 575288.32 Ugnu-MB2 6800.00 64.11 167.68 4234.75 4176.95 -2925.53 3277.25 6.00 6020198.75 575302.51 MWD+IFR+MS 6900.00 64.82 174.28 4277.90 4220.10 -3014.58 3291.37 6.00 6020109.85 575317.49 MWD+IFR+MS 7000.00 65.83 180.79 4319.68 4261.88 -3105.30 3295.26 6.00 6020019.18 575322.25 MWD+IFR+MS 7044.71 66.36 183.67 4337.80 4280.00 -3146.14 3293.66 6.00 6019978.33 575321.05 Ugnu-MC 7095.26 67.04 186.89 4357.80 4300.00 -3192.36 3289.39 6.00 6019932.07 575317.23 SBF2-NA 7100.00 67.10 187.19 4359.65 4301.85 -3196.70 3288.86 6.00 6019927.74 575316.74 MWD+IFR+MS 7160.62 68.00 191.00 4382.80 4325.00 -3252.00 3280.00 6.00 6019872.35 575308.41 MPB-27 T1 Top N 7200.00 68.05 193.55 4397.54 4339.74 -3287.68 3272.24 6.00 6019836.60 575301.00 MWD+IFR+MS 7227.48 68.11 195.32 4407.80 4350.00 -3312.37 3265.88 6.00 6019811.86 575294.88 SBE4-NC 7281.91 68.28 198.84 4428.03 4370.23 -3360.67 3251.04 6.00 6019763.42 575280.51 End Dir : 7281 7300.00 68.28 198.84 4434.72 4376.92 -3376.57 3245.62 0.00 6019747.47 575275.24 MWD+IFR+MS 7308.31 68.28 198.84 4437.80 4380.00 -3383.88 3243.12 0.00 6019740.14 575272.82 SBE2-NE 7387.84 68.28 198.84 4467.24 4409.44 -3453.80 3219.27 0.00 6019669.99 575249.64 Start Dir 12/10 7400.00 69.51 199.67 4471.62 4413.82 -3464.51 3215.53 12.00 6019659.25 575246.01 MWD+IFR+MS 7403.41 69.85 199.91 4472.80 4415.00 -3467.52 3214.44 12.00 6019656.23 575244.95 SBE1-NF 7500.00 79.76 206.15 4498.10 4440.30 -3553.10 3177.94 12.00 6019570.31 575209.28 MWD+IFR+MS 7596.00 89.72 211.97 4506.90 4449.10 -3636.51 3131.55 12.00 6019486.47 575163.70 7" 7596.47 89.77 212.00 4506.90 4449.10 -3636.90 3131.30 12.00 6019486.07 575163.46 MPB-27 T2 Top 0 7600.00 89.77 212.00 4506.91 4449.11 -3639.90 3129.43 0.00 6019483.06 575161.61 MWD+IFR+MS 7626.69 89.77 212.00 4507.02 4449.22 -3662.53 3115.28 0.00 6019460.29 575147.69 Start Dir 6/100 7700.00 89.77 216.40 4507.32 4449.52 -3723.15 3074.09 6.00 6019399.28 575107.09 MWD+IFR+MS 7800.00 89.77 222.40 4507.72 4449.92 -3800.39 3010.65 6.00 6019321.44 575044.40 MWD+IFR+MS 7820.34 89.77 223.62 4507.80 4450.00 -3815.26 2996.78 6.00 6019306.43 575030.68 MPB-27 T3 Mid 0 7848.43 89.10 225.16 4508.08 4450.28 -3835.33 2977.13 6.00 6019286.17 575011.22 End Dir : 7848 7900.00 89.10 225.16 4508.89 4451.09 -3871.69 2940.56 0.00 6019249.47 574975.02 MWD+IFR+MS 8000.00 89.10 225.16 4510.47 4452.67 -3942.19 2869.66 0.00 6019178.29 574904.80 MWD+IFR+MS 8100.00 89.10 225.16 4512.04 4454.24 -4012.69 2798.75 0.00 6019107.12 574834.59 MWD+IFR+MS 8200.00 89.10 225.16 4513.62 4455.82 -4083.19 2727.85 0.00 6019035.94 574764.38 MWD+IFR+MS 8300.00 89.10 225.16 4515.19 4457.39 -4153.69 2656.95 0.00 6018964.77 574694.17 MWD+IFR+MS 8400.00 89.10 225.16 4516.77 4458.97 -4224.19 2586.04 0.00 6018893.59 574623.96 MWD+IFR+MS 8465.00 89.10 225.16 4517.79 4459.99 -4270.01 2539.96 0.00 6018847.33 574578.32 4112" r 8465.46 89.10 225.16 4517.80 c 4460.00 -4270.34 2539.63 0.00 6018847.00 574578.00 MPB-27 T4 Mid 0 WELL DETAILS Nmne +Nf.s +EI-W - Easting umtuœ Longitude Slot Plan MPB-27 1541.61 216,77 6fl23092.17 571997.42 70"28'24-141N 149"24'4Z.934W NfA ANTI.cOLLIS!ON SETIINOS COMPANY DETAILS BP Amoco Interpolation Method:MD Depth!!Jmge From: 3430 Ma.ximum Range: 1043.12 Interval: 25.00 To: 8465.46 Referenc.e: Plan: MPB-27 \.\'P05 ,-160 -150 -125 -100 45 -50 -25 -0 -25 From 34 1500 2000 2500 3000 3500 4000 4500 5000 5500 6000 6500 7000 7500 8000 8500 9000 90 SURVEY PROGRAM Depth Pm Depth To SurveyIPIan 34-30 1100.00 1100.00 8465.46 ToMD 1500 2000 2500 3000 3500 4000 4500 5000 5500 6000 6500 7000 7500 8000 8500 9000 9500 TcoJ ÇB..o-YRO~SS h-fWD+IFR+MS WELLPATH DETAILS MPB-27 Rìg> Ret: Datum; 235 + 343 57.8Oft Origin Q,jgin Starting +N/-S +E!~W FrornTVD 180.00° 0.00 0.00 3430 LEGEND SECTION DETAILS MPB~27 T1 T-GpNB . . BP Anticollision Report Company: Field: Reference Site: Reference Well: Reference Wellpath: BP Amoco Milne Point MPlBPad Plan MPB-27 MPB-27 Date: 10/14/2004 Time: 16:29:12 Page: Co-ordinate(NE) Reference: Vertical (TVD) Reference: Well: Plan MPB-27, True North 23.5 + 34.3 57.8 GLOBAL SCAN APPLIED: All wellpaths within 200'+ 100/1000 of reference Interpolation Method: MD Interval: 25.00 ft Depth Range: 34.30 to 8465.46 ft Maximum Radius: 1043.12 ft Reference: Error Model: Scan Method: Error Surface: Db: Orade Plan: MPB-27 wp05 & NOT PLANNED PROGRA ISCWSA Ellipse Trav Cyfinder North Ellipse + Casing Casing Points MD 1VD Diameter Hole Size Name ft ft in in 2946.11 2588.70 9.625 12.250 9 518" 7596.00 4506.90 7.000 8.500 7" 8465.00 4517.79 4.500 6.125 4 1/2" Plan: MPB-27 wp05 Date Composed: 9/16/2004 Version: 60 Principal: Yes Tied-to: From: Definitive Path Summary <: Offset Wellpath > Reference Offset Ctr-Ctr No-Go Allowable Site Well Wellpath MD MD Distance Area Deviation Warning ft ft ft ft ft M PI B Pad Beren Plan Beren V2 Plan: Un 300.00 300.00 47.79 0.00 47.79 Pass: NOERRORS M PlB Pad MPB-01 MPB-01 V1 822.43 825.00 200.63 17.81 182.83 Pass: Major Risk M PI B Pad MPB-02 MPB-02 V4 674.65 675.00 25.09 15.24 9.85 Pass: Major Risk M PI B Pad MPB-02 Plan MPB-02A VO Plan: 8465.45 8499.68 0.00 0.00 0.00 Pass: NOERRORS M PI B Pad MPB-03 MPB-03 V1 1578.17 1550.00 65.36 26.21 39.15 Pass: Major Risk M PI B Pad MPB-04A MPB-04A V1 1686.64 1650.00 158.26 30.40 127.86 Pass: Major Risk M PI B Pad MPB-04 MPB-04 V1 1714.36 1675.00 175.64 36.13 139.51 Pass: Major Risk M PI B Pad MPB-05A MPB-05A V1 1959.24 1900.00 82.92 44.67 38.25 Pass: Major Risk M PI B Pad MPB-05 MPB-05 V1 1959.24 1900.00 82.92 44.67 38.25 Pass: Major Risk M PI B Pad MPB-06 MPB-06 V1 869.06 875.00 146.96 17.51 129.45 Pass: Major Risk M PI B Pad MPB-10 MPB-10 V18 579.54 575.00 273.78 11.72 262.06 Pass: Major Risk M PI B Pad MPB-13 MPB-13 V3 2172.50 2325.00 338.38 53.42 284.96 Pass: Major Risk M PI B Pad MPB-15 MPB-15 V1 1665.89 1700.00 120.63 44.16 76.47 Pass: Major Risk M PI B Pad MPB-17 MPB-17 V1 498.05 500.00 81.06 10.78 70.28 Pass: Major Risk M PI B Pad MPB-22 MPB-22 V1 1287.30 1300.00 77.71 31.67 46.04 Pass: Major Risk M PI B Pad MPB-23 MPB-23 V1 844.02 850.00 209.96 19.03 190.93 Pass: Major Risk MPlBPad MPB-25 MPB-25 V1 373.89 375.00 . 111.90 7.16 104.73 Pass: Major Risk M PI B Pad MPB-50 Plan MPB-50 V1 Plan: MPB-50 1499.05 1475.00 85.48 26.69 58.79 Pass: Major Risk M PI B Pad MPB-Disposal#3 Plan MPB-Disposal#3 V5 1945.45 1900.00 4.43 0.00 4.43 Pass: NOERRORS M PI B Pad Plan MPB-26 MPB-26 L 1 Contingency 275.00 275.00 50.16 0.00 50.16 Pass: NOERRORS M PI B Pad Plan MPB-26 MPB-26 L 1 VO Plan: MPB 275.00 275.00 50.16 0.00 50.16 Pass: NOERRORS M PI B Pad Plan MPB-26 MPB-26 V3 Plan: MPB-26 275.00 275.00 50.16 0.00 50.16 Pass: NO ERRORS M PlB Pad Plan MPB-Disposal ~Ian MPB-Disposal Well 1384.66 1400.00 115.23 0.00 115.23 Pass: NO ERRORS MPB...27 Area of Investigation 512. II Ii! Ii! 5i'3.1i!1i!11! 5i''!!:..:I.:I! 575..:I&:I1!! 57!i.5:!I!!EI Si'i'.li.'!lIf/I 5i'B.I!!ElIi! 6.øN.ljøø 6. 82'l.øøe 6.112:3.eølj 6.82:2:.@81j 6.I'!ZL.~~1!I Ei.S21i!.11:I11!1!! s. 8 j 9.1i'I1à1l 6.8j13.øel.l - 6.IU'7.eøl.l - e. IU 6. oel:l S'i'Z:,l:Ie0 57$.1300 5í'? , 0se 5'i'8,lJe0 57'l.0@1J 575.0011 5711.01j0 t Two wells pass beneath the area of investigation: MPE-08 and MPB-13. Both wells have surface casing set and cemented through the Schrader Bluff with the casing shoe outside of the Area of Investigation. e.0Z3.1:I@@ e.0Z2:.1:I@8 6.~Z] ,I.'m~ Ei.l1:IlEl.III1:IEI S.1à19.81à1i'l e.01e.I:I@8 6.817.1:I@8 6.016,l:Ie8 Slot NlA Latitude Longitude 70"28'24.147N 149"24'42.934W LEGEND WELL DETAILS - """"" 6023092,11 571991,42 +8!·W 236,77 +N!.$ 1541.61 """" ManMPB--27 Tool CB..QYRo.s...;; MWD+IFR+MS SURVEY PROGRAM Depth Fm Depth To SurwyiPlan 3430 1.100.00 1100.00 8465,46 "'" N<mb REFERENCE INFORMA nON COMP.~ DETßúLS BP Amoco MPB-01 4, "...... ,........ ..1. j ..... r ""~::: ;~ ~ ,. -. -- I i·, I - i . , 7 800 600()- 200 400 " â 8 t!, +' ?i t: '" ~ ?i ~ 4ôOO 1 i M' 6000 ¡ j , , , , j o , , -2000- Company: Field: Reference Site: Reference Well: Reference Wellpath: . . MPB-27 Area of Investigation Proximity Scan BP Amoco Milne Point MPtBPad Plan MPB-27 MPB-27 NO GLOBAL SCAN: Using user defined selection & scan criteria Interpolation Method: MD Interval: 25.00 ft Depth Range: 34.30 to 8465.46 ft Maximum Radius: 1320.00 ft Casing Points Date: 1012012004 Co-ordinate(NE) Reference: Vertical (IVD) Reference: Reference: Error Model: Scan Method: Error Suñace: Time: 09:46:21 Page: 1 Well: Plan MPB-27, True North 23.5 + 34.3 57.8 Db: Oracle Plan: MPB-27 wp05 & NOT PLANNED PROGRA ISCWSA Ellipse Trav Cylinder North Ellipse + Casing MD TVD Diameter Hole Size Name ft ft in in 3593.89 2867.80 9.625 12.250 9 5/8" 7596.00 4506.90 7.000 8.750 r 8465.00 4517.79 4.500 6.125 4 1/2" Plan: MPB-27 wp05 Date Composed: 9/1612004 Version: 63 Principal: Yes Tied-to: From: Definitive Path Summary < Offset Wellpath .,. Reference Offset Ctr-Ctr No-Go Allowable Site Well Wellpath MD MD Distance Area Deviation Warning ft ft ft ft ft M Pt B Pad MPB-01 MPB-01 V1 822.43 825.00 200.63 17.81 182.83 Pass: Major Risk M Pt B Pad MPB-02 MPB-02 V4 674.65 675.00 25.09 15.24 9.85 Pass: Major Risk M Pt B Pad MPB-03 MPB-03 Vi 1578.17 1550.00 65.36 26.21 39.15 Pass: Major Risk M Pt B Pad MPB-04A MPB-04A V1 1686.64 1650.00 158.26 30.40 127.86 Pass: Major Risk M Pt B Pad MPB-04 MPB-04 V1 1714.36 1675.00 175.64 36.13 139.51 Pass: Major Risk MPtBPad MPB-05A MPB-05A V1 1959.24 1900.00 82.92 44.67 38.25 Pass: Major Risk M Pt B Pad MPB-05 MPB-05 V1 1959.24 1900.00 82.92 44.67 38.25 Pass: Major Risk M Pt B Pad MPB-06 MPB-06 Vi 869.06 875.00 146.96 17.51 129.45 Pass: Major Risk M Pt B Pad MPB-07 MPB-07 V1 867.61 875.00 629.29 17.96 611.33 Pass: Major Risk M Pt B Pad MPB-08 MPB-08 V1 755.85 750.00 744.62 17.38 727.24 Pass: Major Risk M Pt B Pad MPB-08 Plan MPB-08A V14 Plan: 755.85 750.00 744.62 17.44 727.18 Pass: Major Risk M Pt B Pad MPB-09 MPB-09 V1 796.13 800.00 388.77 18.83 369.93 Pass: Major Risk M Pt B Pad MPB-10 MPB-10 V18 579.54 575.00 273.78 11.72 262.06 Pass: Major Risk M Pt B Pad MPB-11 MPB-11 V1 944.30 950.00 510.43 17.98 492.45 Pass: Major Risk M Pt B Pad MPB-12 MPB-12 Vi 1385.01 1375.00 769.66 29.70 739.96 Pass: Major Risk M Pt B Pad MPB-13 MPB-13 V3 2172.50 2325.00 338.38 53.42 284.96 Pass: Major Risk M Pt B Pad MPB-14 MPB-14 V1 1409.21 1400.00 650.33 25.48 624.85 Pass: Major Risk M Pt B Pad MPB-15 MPB-15 V1 1665.89 1700.00 120.63 44.16 76.47 Pass: Major Risk M Pt B Pad MPB-16 MPB-16 Vi 1437.43 1425.00 405.40 28.07 377.33 Pass: Major Risk M Pt B Pad MPB·17 MPB-17 Vi 498.05 500.00 81.06 10.78 70.28 Pass: Major Risk M Pt B Pad MPB-18 MPB-18 V1 896.47 900.00 864.51 19.59 844.91 Pass: Major Risk M Pt B Pad MPB·19 MPB-19 Vi 999.05 975.00 908.00 24.03 883.98 Pass: Major Risk M Pt B Pad MPB-20 MPB-20 Vi 920.61 925.00 983.68 23.72 959.96 Pass: Major Risk M Pt B Pad MPB-21 MPB-21 V1 2143.05 2625.00 741.28 74.28 667.00 Pass: Major Risk M Pt B Pad MPB-22 MPB-22 V1 1287.30 1300.00 77.71 31.67 46.04 Pass: Major Risk M Pt B Pad MPB-23 MPB-23 V1 844.02 850.00 209.96 19.03 190.93 Pass: Major Risk M Pt B Pad MPB-24 MPB-24 Vi 908.94 875.00 851.44 16.49 834.96 Pass: Major Risk M Pt B Pad MPB-25 MPB-25 V1 373.89 375.00 111.90 7.16 104.73 Pass: Major Risk M Pt B Pad MPB-50 Plan MPB-50 V1 Plan: MPB-50 1499.05 1475.00 85.48 26.69 58.79 Pass: Major Risk M PtB Pad Plan MPB-26 MPB-26 L 1 Contingency 448.98 450.00 51.65 10.57 41.09 Pass: Major Risk M Pt B Pad Plan MPB-26 MPB-26 L 1 VO Plan: MPB 448.98 450.00 51.65 10.57 41.09 Pass: Major Risk M Pt B Pad Plan MPB-26 MPB-26 V3 Plan: MPB-26 448.98 450.00 51.65 10.82 40.83 Pass: Major Risk M pt CFP MPCFP-2 MPCFP-2 V3 Out of range M Pt E Pad MPE-04 MPE-04 Vi Out of range M Pt E Pad MPE-06 MPE·06 V1 Out of range M Pt E Pad MPE-08 MPE-08 V1 Out of range M Pt E Pad MPE-09 MPE-09 V2 Out of range M Pt E Pad MPE-090H MPE-090H V1 Out of range M Pt E Pad MPE~10 MPE-10 V1 Out of range M Pt E Pad MPE-17 MPE-17 V1 Out of range M Pt E Pad MPE-21 MPE-21 V14 Out of range M Pt E Pad MPE-21 Plan#1 MPE-21A VO Plan Out of range M Pt E Pad MPE-23 MPE-23 V1 Out of range M Pt E Pad MPE-30 MPE-30 V8 Out of range M Pt E Pad MPE-30 MPE-30A V14 Out of range M Pt E Pad MPE-30 ,MPE-30AL 1 V8 Out of range BP EXPLORATION PB-27 Field: Milne Point Pad: B-Pad DIR/LWD I OH I MWD LOGS FORM DEPTH MD I TVD HOLE SIZE ENG: S. Coyner RIG: Doyon 14 RKB: 59.21 ft CASING SPECS 20.000-in 91.1-lb/ft H-40 Welded, Insul Schrader NB/NC/ND/OA Injector NONE NONE Permafrost 42" MWD/GRlRES NONE 351 10.7 ppg 4.44 tt3/sJ( Base Permafrost 9-5/8" 40 Ib/tt L-80, BTC Int. Yield 5750 psi Collaspse 3090 psi In Permafrost 40% Excess NONE Inclination at Bit IFRlCas Top of Cement 5,617' 65° Inter. CasinCl Cement Slurry 40"k Excess Top Ugnu 6,117' 3,938' 65° Top I NB Sand 7,161' 4,383' Top I NC Sand 7,227' 4,408' Top / NF Shale 7,403' 4,473' 68° 68° 7" 26 Ibslft L-80, BTC-M Int. Yield 7240 psi Collaspse 4790 psi 77.5 bbls, 3635X 15.8 ppg 1.20fI3Isx 2 3% BWOC Ex¡:¡andlng 70° BO° 89° 89° 89° [10/04/04] MPB-27i Weil Plan Schamatic.xJs ____________n__ ---.I -27 ain ell bore MPB .. 27 NB, NC, ND & OA Dual Injector 9-5/8", 40#, L-80, BTC at 3594' MD, 2868' TVD FIT:= 11.3 ppg EMW S Coyner, 10/19/2004 TOC ... 5,617' MD 8-3/4" Hole with LSND Mud 7" Shoe set at ± 890 7596' MD, 4507' TVD ~ 9-5/8", 40#, 3594' MD, STC ND j TOL 80° 7 OA Lateral MPB .. 27i NB, NC, ND & Dual Injector 1" HGR, ZXP& I I ....- .......... ..............!III!IIIIIIII____ I -27 OA Lateral porary Completion Pre-Prod via Jet Pump MPB.. NB, NC, ND & OA Dual Injector 4-1/2" GUIll at +1- 2000' MD BTC .. 3594" MD, 2868' TVD "Reverse Circulation" Jet Pump Configuration I 311 ¡fl II a.1 I I I -1 ..... _........iIIIIIIIiIIIØ -27 OA Lateral Selective Completion ,/: / / / / / I' / I' / I' ,/ ,/ 9-5/8",40#, L-80, BTC /,/ ~ 3594' MD, 2868' TVD ,/,/ / I' I' ,/ I' I' I' ~-3/~ 4,6#. -so, "X" Nipple /") Bore ID :::: 1.875" / / 7" x 2-3/8" x 2-3/8" Annulus Capacilty::: .0273 bbl/ft . 4.6#. -80. "X" Bore ID == 1.875" 2-3/8". -SO. TC-iI ID==1 ,Drift==1.901" Burst == 11200#, Collapse:::; 11780# Capacity == .00387 bbl/ft &ND at .,. MPB .. NB, NC, ND & OA Dual Injector GT-1 Dual Packer ~-3/S". 4.6#. I ..sO. "XN" Nipple Bore ID == 1 , NoGo == 1.791" with WLEG "40 Bore" Seal Nipple ~-3/8", 4.6#. , ..so. "XN" Nipple Bore ID == 1.875", NaGo == 1.791" WLEG (Half Mule-Shoe) / - -- -- - -- -- -""" ,*"'" .......*""" -- """"'~ - ..... ..... ........... ~ I!iiIIIiIIIII _....... _......... 11!111!1111 ....,..__........ _ __...... I 149 32 00 '011 I 30 DO '011 ! 149 2800'011 I 149 26 00 '011 'I ! 1492400 '011 o o o ê N o t5 z MPU Sch Propo 20422 5FD 10/2E1/2004 Feet J . . . . TRANSMIT AL LETTER CHECK LIST CIRCLE APPROPRlA TE LETTERIP ARAGRAPHS TO BE INCLUDED IN TRANSMITTAL LETTER WELL NAME III A~~ ß-2.·7 PTD# /,Development ,/' Service ClIECK WßA T APPLIES ADD-ONS (OPTIONS) MULTI LA TERAL (If APJ Dumber last two. (2) digits are between 60-69) Pll,OT (PH) 7Dcf - 22- / Exploration Stratigraphic ~'CLUE n. Tbe permit is for a Dew wellboresegment of existing weD,. . Permit No, .' API No. Production. sbould continue to be reported as a function 'of tbe original API number. stated above. HOLE )n accordance witb' 20 AAC 25.005(f), an records, data and logs acquired for tbe pilot bole must be dearly differentiated In botb Dame (name on permit plus PH) and API Dumber (50 70/80) from records, data and logs acquired for we)) (name on permit). SPACING EXCEPTJON DRY DITCH SAMPLE The permit is approved subject ·to fun compliance witb 20 AAC 25..0SS~ Approval to perforate and produce is contingent upon issuance of ~ conservation order approving a spacing eneption. (Company Name) assumes tbe liability of any protest to tbe spacing .e:Jception tbat may occur. All dry ditch sample sets submitted to tbe Commission must be in no greater than 30' sample intervals from below tbe permafrost or from where samples are first caught and ] 0' sample h:iter:vals tbrougb target zones. o o Well bore seg Annular Disposal On Program SER On/Off Shore 11328 Unit Well Name: MILNE PT UNIT SB B-27 SER I PEND GeoArea890 gQvemed byCQ 4Z7 El]tire WelUQcated [n_ADL_0~7438 MUnePoint Sc;hrader_ Bluff Oil I=IQo) (5251<40) . 10-B J:\rea ~Qn_e. Oolyto çleaRup welJ WelJ driJled from exisíiog pad No._ Injeçtjo_n_Qrder Yes Yes Yes Yes Yes Yes Yes Yes Yes _Yes Yes Yes Yes Yes Yes No_ NA Initial ClasslType MILNE POINT. SCHRADER BLFF OIL - 525140 BP EXPLORATION (ALASKA) INC Permit fee attaçhe~ Field & Pool Company Lease _n!Jmberappropri~te_ .U_niq!Je well name _and ol m~r Well Joc~ted in a_ d_efil]e~ -pool WellJQc~ted proper _distance_ from driJling ul]itb_o!Jl]d_ary_ WeJIJocated pr_oper _distance_ from other welJs indJilIiog unjt il]cJuded S_utfiçientaçreage _aYail~ble Jfdeviated. js_ weJlbQre plç¡t O-perator OI]Iy: affected party _O-perator has_appropriate_ bond inJQrce P_eunit Permit Can permit WellJQc~ted withil] area and_strat~ _authQrized by lojectioo Order ço_nserva_tiOI] order ad_mioistratÏ\le_ a-pprovaJ 15-day wait c;ao be issued wjthQut c_ao be issued withQut (for # (p!JlIO# ol]ly:)_ _ _ (for service well onJy) in_ commeots)_ be approved before reyiew ideotified s.ervjc_e _wel _d!JratiQn_of pre--pro_ductioo less. than 3 mOl]ths_ AÇMP_ Finding of Con$i$tençy_h_as beenis.s!Jed_ for this pr_oject_ (For _AJI weIJs-,,~ithiJl Jl4_mile_area_of PJe-produ_ced ìojector 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 PTD#: 2042210 Administration Date Appr SFD 10/28/2004 J:\Il a~uifers exempted,AD _CFR 1<47-1 Q31b)(3) Toe plaon_ed above UgOlt. SloUe_d lioer _completioo plaOl]ed._ No reserve_pjt-planoe_d, All waste to_disposal wells. Rig is_ e_q!Jippedwith steelpjts. I?r.o~imity: analysis pertoune_d, çJO$e ç¡PPJQache.s identified. Tr~lleJilJg cylinder plot included, e Maximl m expected 61:11=1 8.7 EMW, buUikely: lower due to_PJoductiork 1?1~lJned MWs_ to 9._3ppg. 30QOpsiBQ~ test-planlJed, 1585 psi MJ:\SI=I çalc;ulate~_at 1:125 produ_ctioRis 1]01 reporte~lJrom_Schrader _Bluf( Rigjs equipped with selJsors and ~Iarms. ~Q wells jd_entjfied in_area_of reyiew. Yes NA Yes No_ No_ Yes Yes NA Yes Yes Yes Yes Yes Yes _Yes No_ Yes _Condu_ctor Swfacecasil]gprotec;ts alLkJlown USDWs string_ pJovided 18 19 20 21 Engineering & SUJfc.sg _CMT vol adequate_ to circulate_on _COnd_uctor_ tie-in long _string to surf csg _CJv1T v.ol adequ_ate_ to klJownpro_d!Jc;tiye hori~on_s _CMTwil! çoyer_al _C_asiog designs. adequale for C,T, B&_peunafrost Adequatetankç¡ge_Qr reserve pit 10A03 fQr abandOllmeJlt beeo apPJoved Jfdiverter Jeq_uired. does it meet reguJations_ _DJiUiog fluid program sc;hematic& e~uip Jistadequate _BOPEs, _ d.o _they meet regulatiol] _commel]ts) psig iJl _test to _(pu_t _Chokemanjfold compJies w/API RI'-53 (.May 84) Work will oçc_ur _BOPEpress raliog ap-propriate; withoutoperç¡tioJl_shutdown Date TEM 10/28/2004 29 , Ct:.-iW\ 30 FTr 'Û("cl 31 y~ 32 33 34 22 23 24 25 26 27 28 Ifa re-drilt has_ a_ _A~equate J/Ilellbore s.eparatioJl -proposed Appr only) H2S gn probable Mecha_n[cç¡Lcoodjtion.of wells withil] J:\OR yerifie<t (For service welJ Is presence_ Qf has _H2S _onBol'a~ _ SED Sands expected to be normalJYPJessured (8,rp-pg _EMW); wilJ be drilled with_8,& OOly (up_aru_kJeservoir Yes Yes NA _NA NA c;al1 be issued w/Q hydrogen_s_ulfide measures _ZOnes Peunit _D_ata_PJeseoted on pote_ntial OlleJpres.s!Jre 35 36 Date 37 10/28/2004 38 39 Geology Appr SFD 9.3 ppg_mwt _SeismicanalysJs_ of shallow gas_zooes_ _(if off-sh_ore) _Seç¡bed _conditiøo survey Date 'fir Conta_ct namelphOlleJor_weß~ly progress_reports [explQratøry _only] m td~"e' Date Engineering Commissioner Date: 1i { 1- I Geologic Commissioner: l>1S . . Well History File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history file. To improve the readability of the Well History file and to simplify finding infomlation, information of this nature is accumulated at the end of the file under APPENDIX. No special effort has been made to chronologically organize this category of information. . Sperry-Sun Drilling Services LIS Scan Utility . c1ot/- ¿z! $Revision: 3 $ LisLib $Revision: 4 $ Thu Apr 14 16:07:19 2005 #/)107 Reel Header Service name....... ......LISTPE Date. . . . . . . . . . . . . . . . . . . . .05/04/14 Origin. . . . . . . . . . . . . . . . . . . STS Reel Name........... .....UNKNOWN Continuation Number..... .01 Previous Reel Name.... ...UNKNOWN Comments... ..... ........ .STS LIS Writing Library. Scientific Technical Services Tape Header Service name............ .LISTPE Date. . . . . . . . . . . . . . . . . . . . .05/04/14 Origin. . . . . . . . . . . . . . . . . . . STS Tape Name............... . UNKNOWN Continuation Number.. .., .01 Previous Tape Name. ......UNKNOWN Comments............... ..STS LIS Writing Library. Scientific Technical Services Physical EOF Comment Record TAPE HEADER Milne Point MWD/MAD LOGS # WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: # JOB DATA MPB-27 500292323300 BP Exploration (Alaska), Inc. Sperry Drilling Services 14-APR-05 JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: MWD RUN 1 MW0003405887 C.A. DEMOSKI D. GREEN MWD RUN 2 MW0003405887 C.A. DEMOSKI D. GREEN MWD RUN 3 MW0003405887 C.A. DEMOSKI D. GREEN JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: MWD RUN 4 MW0003405887 C.A. DEMOSKI D. GREEN # SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL: FSL: FEL: FWL: ELEVATION (FT FROM MSL 0) KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: 19 13N llE 5249 4295 56.90 23.30 # WELL CASING RECORD OPEN HOLE CASING DRILLERS 1ST STRING 2ND STRING 3RD STRING PRODUCTION STRING . BIT SIZE (IN) 12.250 8.750 6.125 SIZE (IN) 20.000 9.625 7.000 DEPTH (FT) 114.0 3593.0 7613.0 . # REMARKS: 1. ALL DEPTHS ARE MEASURED DEPTH (MD) UNLESS OTHERWISE NOTED. THESE DEPTHS ARE BIT DEPTHS. 2. ALL VERTICAL DEPTHS ARE TRUE VERTICAL DEPTH (TVD). 3. MWD RUNS 1 & 2 COMPRISED DIRECTIONAL AND DUAL GAMMA RAY (DGR) UTILIZING GEIGER-MUELLER TUBE DETECTORS. 4. MWD RUNS 3 & 4 COMPRISED DIRECTIONAL, DGR, AND ELECTROMAGNETIC WAVE RESISTIVITY PHASE-4 (EWR4). RUN 4 ALSO INCLUDED PRESSURE-WHILE-DRILLING (PWD), AND AT-BIT INCLINATION (ABI). 5. DEPTH SHIFTING/CORRECTION OF MWD DATA WAS WAIVED PER PHONE CONVERSATION BETWEEN DENNIS URBAN (BP GEOSCIENTIST) AND BUSTER BRYANT (SDS) ON 4/13/05. MWD DATA ARE CONSIDERED PDC. 6. MWD RUNS 1-4 REPRESENT WELL MPB-27 WITH API#: 50-029-23233-00. THIS WELL REACHED A TOTAL DEPTH (TD) OF 8480 'MD/4545 'TVD. SROP SMOOTHED RATE OF PENETRATION WHILE DRILLING. SGRC SMOOTHED GAMMA RAY COMBINED. SEXP SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (EXTRA SHALLOW SPACING) . SESP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (SHALLOW SPACING) . SEMP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (MEDIUM SPACING) . SEDP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (DEEP SPACING) . SFXE = SMOOTHED FORMATION EXPOSURE TIME (SEDP). SLIDE = NON-ROTATED INTERVALS. $ File Header Service name............ .STSLIB.001 Service Sub Level Name... Version Number.......... .1.0.0 Date of Generation...... .05/04/14 Maximum Physical Record..65535 File Type.... ........... .LO Previous File Name...... .STSLIB.OOO Comment Record FILE HEADER FILE NUMBER: EDITED MERGED MWD Depth shifted DEPTH INCREMENT: # FILE SUMMARY PBU TOOL CODE GR ROP FET 1 and clipped curves; all bit runs merged. .5000 START DEPTH 60.5 114.5 3550.5 STOP DEPTH 8422.5 8480.0 8429.5 RPD RPM RPS RPX $ . 3550.5 3550.5 3550.5 3550.5 8429.5 8429.5 8429.5 8429.5 . # BASELINE CURVE FOR SHIFTS: CURVE SHIFT DATA (MEASURED DEPTH) --------- EQUIVALENT UNSHIFTED DEPTH --------- BASELINE DEPTH $ # MERGED DATA SOURCE PBU TOOL CODE MWD MWD MWD MWD $ BIT RUN NO 1 2 3 4 MERGE TOP 60.5 2244.5 3603.0 7613.0 MERGE BASE 2244.5 3603.0 7613 . 0 8480.0 # REMARKS: MERGED MAIN PASS. $ # Data Format Specification Record Data Record Type..................O Data Specification Block Type.....O Logging Direction...... ......... ..Down Optical log depth units.......... .Feet Data Reference Point......... .....Undefined Frame Spacing... ....... ......... ..60 .1IN Max frames per record............ . Undefined Absent value....... ........ .......-999 Depth Units. . . . . . . . . . . . . . . . . . . . . . . Datum Specification Block sub-type...O Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD FT/H 4 1 68 4 2 GR MWD API 4 1 68 8 3 RPX MWD OHMM 4 1 68 12 4 RPS MWD OHMM 4 1 68 16 5 RPM MWD OHMM 4 1 68 20 6 RPD MWD OHMM 4 1 68 24 7 FET MWD HOUR 4 1 68 28 8 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 60.5 8480 4270.25 16840 60.5 8480 ROP MWD FT/H 1.9 628.12 198.089 16732 114.5 8480 GR MWD API 9.47 432.86 68.8551 16725 60.5 8422.5 RPX MWD OHMM 0.05 1867.42 6.7596 9759 3550.5 8429.5 RPS MWD OHMM 0.53 2000 7.76997 9759 3550.5 8429.5 RPM MWD OHMM 0.39 2000 15.9628 9759 3550.5 8429.5 RPD MWD OHMM 0.49 2000 30.7165 9759 3550.5 8429.5 FET MWD HOUR 0.16 69.33 1. 77148 9759 3550.5 8429.5 First Reading For Entire File......... .60.5 Last Reading For Entire File.......... .8480 File Trailer Service name.. .......... .STSLIB.001 Service Sub Level Name... Version Number;......... .1.0.0 Date of Generation...... .05/04/14 . h· . Maxlmum P YSlcal Record..65535 File Type. .............. .LO Next File Name.......... .STSLIB.002 Physical EOF File Header Service name.... ..... ... .STSLIB.002 Service Sub Level Name... Version Number.......... .1.0.0 Date of Generation.... ...05/04/14 Maximum Physical Record. .65535 File Type............... .LO Previous File Name...... .STSLIB.001 Comment Record FILE HEADER FILE NUMBER: RAW MWD Curves and log BIT RUN NUMBER: DEPTH INCREMENT: # FILE SUMMARY VENDOR TOOL CODE GR ROP $ 2 . header data for each bit run in separate files. 1 .5000 START DEPTH 60.5 114.5 STOP DEPTH 2191. 0 2244.5 # LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME) : TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: # TOOL STRING (TOP TO VENDOR TOOL CODE DGR $ BOTTOM) TOOL TYPE DUAL GAMMA RAY # BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): # BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: # NEUTRON TOOL 21-NOV-04 Insite 66.37 Memory 2244.0 114.0 2244.0 .0 35.0 TOOL NUMBER 61497 12.250 114.0 Spud Mud 9.00 136.0 8.0 1000 9.2 .000 .000 .000 .000 .0 71.6 .0 .0 . . MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): # TOOL STANDOFF (IN): EWR FREQUENCY (HZ): # REMARKS: $ # Data Format Specification Record Data Record Type.... . . . . . . . . . . . . . .0 Data Specification Block Type.....O Logging Direction.. ......... .... ..Down Optical log depth units.......... .Feet Data Reference Point............. .Undefined Frame Spacing.................... .60 .1IN Max frames per record............ . Undefined Absent value..................... .-999 Depth Units. . . . . . . . . . . . . . . . . . . . . . . Datum Specification Block sub-type...O Service Order Units FT FT/H API Size 4 4 4 Nsam Rep 1 68 1 68 1 68 Code Offset o 4 8 Channel 1 2 3 Name DEPT ROP GR MWD010 MWD010 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 60.5 2244.5 1152.5 4369 60.5 2244.5 ROP MWD010 FT/H 3.43 628.12 181.973 4261 114.5 2244.5 GR MWD010 API 21.84 432.86 67.2784 4262 60.5 2191 First Reading For Entire File.... ..... .60.5 Last Reading For Entire File.......... .2244.5 File Trailer Service name............ .STSLIB.002 Service Sub Level Name... Version Number.......... .1.0.0 Date of Generation...... .05/04/14 Maximum Physical Record. .65535 File Type..... .......... .LO Next File Name. ......... .STSLIB.003 Physical EOF File Header Service name......... ....STSLIB.003 service Sub Level Name... Version Number....... ....1.0.0 Date of Generation.......05/04/14 Maximum Physical Record. .65535 File Type......... .......LO Previous File Name.. .....STSLIB.002 Comment Record FILE HEADER FILE NUMBER: 3 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 2 DEPTH INCREMENT: # FILE SUMMARY VENDOR TOOL CODE GR ROP $ . .5000 START DEPTH 2191. 5 2245.0 STOP DEPTH 3560.0 3603.0 # LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME) : TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: # TOOL STRING (TOP TO VENDOR TOOL CODE DGR $ BOTTOM) TOOL TYPE DUAL GAMMA RAY # BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): # BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: # NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): # TOOL STANDOFF (IN): EWR FREQUENCY (HZ): # REMARKS: $ # Data Format Specification Record Data Record Type..................O Data Specification Block Type.. ...0 Logging Direction. . . . . . . . . . . . . . . . . Down Optical log depth units....... ....Feet Data Reference Point............. . Undefined Frame Spacing....... ...... ........60 .1IN Max frames per record............ . Undefined Absent value.. . . . . . . . . . . . . . . . . . . . . -999 Depth Units. . . . . . . . . . . . . . . . . . . . . . . Datum Specification Block sub-type...O . 21-NOV-04 Insite 66.37 Memory 3603.0 2244.0 3603.0 37.1 67.9 TOOL NUMBER 120557 12.250 114.0 Spud Mud 9.60 110.0 8.3 700 10.0 .000 .000 .000 .000 .0 84.2 .0 .0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT ROP MWD020 GR MWD020 . 4 4 4 FT FT/H API 1 68 1 68 1 68 1. 2 3 o 4 8 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 2191. 5 3603 2897.25 2824 2191.5 3603 ROP MWD020 FT/H 5.38 520.45 219.988 2717 2245 3603 GR MWD020 API 22.51 116.66 64.5102 2738 2191. 5 3560 First Reading For Entire File......... .2191.5 Last Reading For Entire File......... ..3603 File Trailer Service name............ .STSLIB.003 Service Sub Level Name... Version Number.......... .1.0.0 Date of Generation...... .05/04/14 Maximum Physical Record. .65535 File Type............ .., .LO Next File Name..... ..... .STSLIB.004 Physical EOF File Header Service name............ .STSLIB.004 Service Sub Level Name... Version Number...... .....1.0.0 Date of Generation..... ..05/04/14 Maximum Physical Record..65535 File Type............... .LO Previous File Name...... .STSLIB.003 Comment Record FILE HEADER FILE NUMBER: RAW MWD Curves and log BIT RUN NUMBER: DEPTH INCREMENT: # FILE SUMMARY VENDOR TOOL CODE FET RPD RPM RPS RPX GR ROP $ 4 header data for each bit run in separate files. 3 .5000 START DEPTH 3550.5 3550.5 3550.5 3550.5 3550.5 3560.5 3603.5 # LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME) : TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): STOP DEPTH 7560.5 7560.5 7560.5 7560.5 7560.5 7568.0 7613 . 0 25-NOV-04 Insite 66.37 Memory 7613.0 3603.0 7613.0 . HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: # TOOL STRING (TOP TO VENDOR TOOL CODE DGR EWR4 $ BOTTOM) TOOL TYPE DUAL GAMMA RAY ELECTROMAG. RESIS. 4 # BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): # BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: # NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): # TOOL STANDOFF (IN): EWR FREQUENCY (HZ): # REMARKS: $ # Data Format Specification Record Data Record Type..................O Data Specification Block Type... ..0 Logging Direction.. ......... ......Down Optical log depth units.......... .Feet Data Reference Point. ....... '" ...Undefined Frame Spacing.................... .60 .1IN Max frames per record.. ... ...... ..Undefined Absent value..................... .-999 Depth Units. . . . . . . . . . . . . . . . . . . . . . . Datum Specification Block sub-type...O . 63.0 81. 7 TOOL NUMBER 132477 134758 8.750 3593.0 LSND 9.30 50.0 7.5 400 5.4 3.000 2.290 3.600 3.600 75.0 100.5 75.0 75.0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD030 FT/H 4 1 68 4 2 GR MWD030 API 4 1 68 8 3 RPX MWD030 OHMM 4 1 68 12 4 RPS MWD030 OHMM 4 1 68 16 5 RPM MWD030 OHMM 4 1 68 20 6 RPD MWD030 OHMM 4 1 68 24 7 FET MWD030 HOUR 4 1 68 28 8 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 3550.5 7613 5581.75 8126 3550.5 7613 ROP MWD030 FT/H 2.22 605.26 208.329 8020 3603.5 7613 GR MWD030 API 9.47 133.65 71.563 8016 3560.5 7568 RPX MWD030 OHMM 0.05 1867.42 6.18907 8021 3550.5 7560.5 · ~550.5 RPS MWD030 OHMM 0.53 2000 7.19959 8021 7560.5 RPM MWD030 OHMM 0.39 2000 8.73502 8021 3550.5 7560.5 RPD MWD030 OHMM 0.49 2000 20.3027 8021 3550.5 7560.5 FET MWD030 HOUR 0.16 37.74 1.09028 8021 3550.5 7560.5 First Reading For Entire File.. ....... .3550.5 Last Reading For Entire File.......... .7613 File Trailer Service name..... ....... .STSLIB.004 Service Sub Level Name... Version Number... ....... .1.0.0 Date of Generation...... .05/04/14 Maximum Physical Record. .65535 File Type............... .LO Next File Name....... '" .STSLIB.005 Physical EOF File Header Service name............ .STSLIB.005 Service Sub Level Name... Version Number.......... .1.0.0 Date of Generation...... .05/04/14 Maximum Physical Record. .65535 File Type........... .... .LO Previous File Name.... ...STSLIB.004 Comment Record FILE HEADER FILE NUMBER: RAW MWD Curves and log BIT RUN NUMBER: DEPTH INCREMENT: # FILE SUMMARY VENDOR TOOL CODE RPD RPM RPS RPX FET GR ROP $ 5 header data for each bit run in separate files. 4 .5000 START DEPTH 7561.0 7561.0 7561.0 7561.0 7561.0 7568.5 7613.5 STOP DEPTH 8429.5 8429.5 8429.5 8429.5 8429.5 8422.5 8480.0 # LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME) : TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: 28-NOV-04 Insite 66.37 Memory 8480.0 7613.0 8480.0 80.4 91.7 # TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE DGR DUAL GAMMA RAY TOOL NUMBER 62456 EWR4 $ . Electromag Resis. 4 # BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT): # BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S): MUD PH: MUD CHLORIDES (PPM): FLUID LOSS (C3): RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: # NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): # TOOL STANDOFF (IN): EWR FREQUENCY (HZ): # REMARKS: $ # Data Format Specification Record Data Record Type..................O Data Specification Block Type.....O Logging Direction........... ......Down Optical log depth units.......... .Feet Data Reference Point..... ....... ..Undefined Frame Spacing... ................. .60 .1IN Max frames per record. . . . . . . . . . . . .Undefined Absent value. . . . . . . . . . . . . . . . . . . . . . -999 Depth Units. . . . . . . . . . . . . . . . . . . . . . . Datum Specification Block sub-type...O 130910 . 6.125 7613.0 FLO-PRO 9.20 54.0 9.5 23000 4.2 .120 .090 .320 .200 78.0 102.2 78.0 78.0 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD040 FT/H 4 1 68 4 2 GR MWD040 API 4 1 68 8 3 RPX MWD040 OHMM 4 1 68 12 4 RPS MWD040 OHMM 4 1 68 16 5 RPM MWD040 OHMM 4 1 68 20 6 RPD MWD040 OHMM 4 1 68 24 7 FET MWD040 HOUR 4 1 68 28 8 First Last Name Service Unit Min Max Mean Nsam Reading Reading DEPT FT 7561 8480 8020.5 1839 7561 8480 ROP MWD040 FT/H 1.9 318.29 156.016 1734 7613 .5 8480 GR MWD040 API 28.16 112.02 67.0463 1709 7568.5 8422.5 RPX MWD040 OHMM 0.43 962.18 9.39265 1738 7561 8429.5 RPS MWD040 OHMM 0.55 964.89 10.4023 1738 7561 8429.5 RPM MWD040 OHMM 0.45 2000 49.3195 1738 7561 8429.5 RPD MWD040 OHMM 3.42 2000 78.7771 1738 7561 8429.5 FET MWD040 HOUR 0.27 69.33 4.9153 1738 7561 8429.5 First Reading For Entire File......... .7561 ~ . Last Reading For Entire File.. ........ .8480 . File Trailer Service name.. ... ..... ...STSLIB.005 Service Sub Level Name... Version Number......... ..1.0.0 Date of Generation...... .05/04/14 Maximum Physical Record. .65535 File Type............... .LO Next File Name.......... .STSLIB.006 Physical EOF Tape Trailer Service name.......... ...LISTPE Date. . . . . . . . . . . . . . . . . . . . .05/04/14 Origin. . . . . . . . . . . . . . . . . . . STS Tape Name............... .UNKNOWN Continuation Number.... ..01 Next Tape Name.......... . UNKNOWN Comments......... ........STS LIS Writing Library. Scientific Technical Services Reel Trailer Service name..... ...... ..LISTPE Date.................... .05/04/14 Origin.................. .STS Reel Name............... . UNKNOWN Continuation Number.... ..01 Next Reel Name...... .....UNKNOWN Comments................ .STS LIS Writing Library. Scientific Technical Services Physical EOF physical EOF End Of LIS File