HomeMy WebLinkAbout212-156MEMORANDUM State of Alaska
Alaska Oil and Gas Conservation Commission
DATE:Wednesday, May 14, 2025
SUBJECT:Mechanical Integrity Tests
TO:
FROM:Sully Sullivan
P.I. Supervisor
Petroleum Inspector
NON-CONFIDENTIAL
Hilcorp Alaska, LLC
SI13-FN04
NIKAITCHUQ SI13-FN04
Jim Regg
InspectorSrc:
Reviewed By:
P.I. Suprv
Comm ________
JBR 05/14/2025
SI13-FN04
50-629-23477-00-00
212-156-0
W
SPT
3829
2121560 1500
619 619 619 619
250 400 395 390
4YRTST P
Sully Sullivan
4/15/2025
30 MinPretestInitial15 Min
Well Name
Type Test
Notes:
Interval P/F
Well
Permit Number:
Type Inj TVD
PTD Test psi
API Well Number Inspector Name:NIKAITCHUQ SI13-FN04
Inspection Date:
Tubing
OA
Packer Depth
5 1711 1690 1681IA
45 Min 60 Min
Rel Insp Num:
Insp Num:mitSTS250416115448
BBL Pumped:6.7 BBL Returned:4.8
Wednesday, May 14, 2025 Page 1 of 1
9
9
9
9
9
9 9
999
9 9
99
9
9
James B. Regg Digitally signed by James B. Regg
Date: 2025.05.14 12:29:41 -08'00'
MEMORANDUM State of Alaska
Alaska Oil and Gas Conservation Commission
DATE: Wednesday, May 5, 2021
TO: Jim Regg -Zi I ,I
—Z l`9 SLI SUBJECT: Mechanical Integrity Tests
P.1. Supervisor
Ent US operating Company Inc.
5113-FN04
FROM: Guy Cook NIKAITCHUQ SII3-FN04
Petroleum Inspector
Src: Inspector
Reviewed By!:7,
P.I. Supry
NON -CONFIDENTIAL Comm
Well Name NIKAITCHUQ 5113-FN04
Insp Num: mitGDC210501112345
Rel Insp Num:
API Well Number 50-629-23477-00-00 Inspector Name: Guy Cook
Permit Number: 212-156-0 Inspection Date: 4/30/2021 '
Packer Depth Pretest Initial
Well -. -S113 FN04 dType Inj w TVD 1829 Tubing 390 - 390 -
PTD 2121560 Type Test s 'Test psi o - IA 851 176
BBL Pumped '-' -7BBL Returned: " OA zoo 330
Interval 4rRIS"I P/F 1'
Notes: Testing done with a triplex pump, calibrated gauges and a bleed trailer.
Tes3� dj4k be'n-- 6e,
15 Min 30 Min 45 Min 60 Min
390 - 389
-
290 _ 270-
Wednesday,
70-
Wednesday, May 5, 2021 Page I of I
• S
MEMORANDUM State of Alaska
Alaska Oil and Gas Conservation Commission
TO: Jim Regg DATE: Wednesday,December 28,2016
P.I.Supervisor i -et 1 ( Z't ll Ga SUBJECT: Mechanical Integrity Tests
l ENI US OPERATING CO INC
SI13-FNO4
FROM: Jeff Jones NIKAITCHUQ SI13-FN04
Petroleum Inspector
Src: Inspector
Reviewed By:
P.I.SuprvJ2_—
NON-CONFIDENTIAL Comm
Well Name NIKAITCHUQ S113-FNO4 API Well Number 50-629-23477-00-00 Inspector Name: Jeff Jones
Permit Number: 212-156-0 Inspection Date: 12/10/2016
Insp Num: mitJJ161213202941
Rel Insp Num:
Packer Depth Pretest Initial 15 Min 30 Min 45 Min 60 Min
Well
S113-FN04 - Type Inj W TVD 3829 " Tubing 389 - 389 , 389, j 389
PTD 2121560 - Type Test SPT Test psi 1500 IA 434 1662 - 1649 - 1640 -
- lF— - --
Interval iTST P/F P OA zso 280 280 _280
Notes: 3,4 barrels diesel pumped. 1 well inspected,no exeptions noted.
SCAVOIED
Wednesday,December 28,2016 Page 1 of 1
Technical Report Title
Date
Client: ENI Petroleum
Field: Nikaitchuq
Rig: Doyon 15
Date: December 12, 2012
Surface Data Logging
End of Well Report
SI13-FN4
TABLE OF CONTENTS
1. General Information
2. Daily Summary
3. Morning Reports
4. Bit Record
5. Mud Record
6. Show Reports
7. Formation Tops
8. Survey Report
9. Days vs. Depth
Digital Data to include:
Final Logs
Halliburton Log Viewer
EMF Log Viewer
End of Well Report in PDF format
ADI Backup
GENERAL WELL INFORMATION
Company: Eni Petroleum
Rig: Doyon 15
Well: SI13-FN4
Field: Nikaitchuq
Borough: North Slope Borough
State: Alaska
Country: United States
API Number: 50-629-23472-00-00
Sperry Job Number: AK-AM-0009957275
Job Start Date: 06 Nov 2012
Spud Date: 09 Nov 2012
Total Depth: 20,974’ MD / 3,833’ TVD
Total Depth Date: 30 Nov 2012
North Reference: True
Declination: 20.238˚
Dip Angle: 81.068˚
Total Field Strength: 57617.961 nT
Date Of Magnetic Data: 06 Nov 2012
Wellhead Coordinates N: North 70° 33' 28.02313"
Wellhead Coordinates W: West 149° 54' 16.83772"
Drill Floor Elevation: 54.01’
Ground Elevation: 13.1’
Permanent Datum: Mean Sea Level
SDL Engineers: Emil Opitz, Leigh Ann Rasher,
Alexander Kalenuik
Company Geologist: Andrew Buchanan
Company Representatives: Jack Keener, Mike Ross
SSDS Unit Number: 110
DAILY SUMMARY
Begin SI13-FN4
11/06/2012
Rig is being moved. Mudloggers are on standby.
11/07/2012
Mudloggers rigged up. Load pipe shed with 5” drill pipe.
11/08/2012
Mudloggers finish rigging up and calibrate gas equipment. Finish picking up 5” drill pipe.
11/09/2012
Drill out conductor to 160’ MD. Pick up BHA #2 and drill ahead to 310’ MD. Rack back one stand and pick
up flex collar and jars. Inspect top drive, run in hole and drill ahead taking gyro surveys as needed.
11/10/2012
Continue to drill ahead in 16” surface section.
11/11/2012
Continue to drill ahead 16” surface section to TD of 3735’ MD/ 2421.1’ TVD. Back ream out of hole per
K&M.
11/12/2012
Continue to back ream out of hole per K&M. Lay down BHA #2.
11/13/2012
Rig up for running casing. Run in hole with 13 3/8” casing to 3720’ MD. Rig up and prepare for cement.
Cement casing and lay down landing joint. Rig down cement and casing equipment.
11/14/2012
Continue to rig down casing equipment. Clean out and nipple down diverter system. Nipple up well head
and BOPE. Service top drive, rig up and test BOPE.
11/15/2012
Continue to test BOPE. Rig down BOPE testing equipment. Make up BHA #3 and shallow test BHA at
253’ MD. Run in hole to 3614’ MD, circulate bottoms up and test casing to 2500 psi for 30 minutes. Wash
to 3735’ MD, drill shoe track and 20’ of new hole. Displace well and perform FIT to 12.8 ppg EMW. Drill
ahead to 4100’ MD as of midnight. Max gas observed was 46 units.
11/16/2012
Drill ahead from 4100’ MD to 6710’ MD. Max gas observed was 101 units at 4701’ MD.
11/17/2012
Continue to drill ahead from 6710’ MD to 8935’ MD. Max gas observed was 41 units at 8286’ MD.
11/18/2012
Continue to drill ahead 8935’ MD to 9494’ MD. Circulate bottoms up and back ream out of hole due to
Xceed tool failure. Max gas observed was 46 units at 9400’ MD.
11/19/2012
Continue to back ream out of hole to shoe, monitor well static. Back ream to 1000’ MD and circulate
bottoms up 3 times. Pull out of the hole and change out BHA. Run in hole to 3700’ MD. Cut and slip drill
line.
11/20/2012
Run in hole to 9400’ MD and wash to 9492’ MD. Drill ahead to intermediate TD of 11453’ MD. Circulate
bottoms up 4.5 times while pulling out of hole to 11000’ MD. Max gas observed was 531 units at 10202’
MD.
11/21/2012
Back ream out of hole from 11000’ MD to 1000’ MD per K&M. Circulate bottoms up twice, pull out of hole
and lay down BHA #4.
11/22/2012
Continue to lay down BHA #4. Rig up casing equipment and run in hole with 9 5/8” casing.
11/23/2012
Continue to run in hole with 9 5/8” casing to 11446’ MD. Rig up cement head and lines. Fill casing per
well plan and condition mud. Pump 110 bbls mud push, 203 bbls cement, 10 bbls water and bump plug
with 850 bbls LSND. Test casing to 1000 psi for 10 minutes and perform 20 bbl injectivity test down
annulus with LSND. Rig down cement equipment, nipple down BOPE and set e-slips.
11/24/2012
Finish e-slips and nipple up BOPE. Freeze protect annulus and rack back 4.5” drill pipe. Change out rams
in BOPE, rig up and test BOPE.
11/25/2012
Test BOPE, R/D testing equipment, M/U drilling BHA #5, RIH & shallow test@ 280’, RIH t/8,533’, CBL to
9,407’.
11/26/2012
CBL to 11356’ MD. Casing pressure test 3000psi for 30 min. Displace OBM. Drill out cement and then
20’ MD of new formation. To 11473’ MD. Perform FIT to 13.0 ppg EMW. Drill ahead.
11/27/2012
Drill ahead 8.75” hole from 11,586 MD to 14,307’ MD/3,852T TVD. Cuttings consist of unconsolidated
sands with lesser amounts of calcareously cemented sandstone and siltstone cuttings.
11/28/2012
Drill ahead 8.75” hole from 14,307’ MD to 16,681’ MD / 3,844’ TVD. Cuttings consist of unconsolidated
sands with lesser amounts of calcareously cemented sandstone and siltstone cuttings. Max gas 1502
units with BG 98 units.
11/29/2012
Drill ahead 8.75” hole from 16,681’ MD to 19,480’ MD / 3,832’ TVD. Cuttings consist of unconsolidated
sands with lesser amounts of calcareously cemented sandstone and siltstone cuttings. Max gas was
1403 u, min 73u.
11/30/2012
Drill ahead 8.75” hole from 19,480’ MD to TD at 20,974’ MD / 3,829’ TVD. Backream OOH; rack back one
std every 30 min. at 525 gpm, 140 rpm & 3750 psi. Cuttings consist of unconsolidated sands with lesser
amounts of calcareously cemented sandstone and siltstone cuttings
12/01/2012
Backream out of hole per K&M detail & as hole dictates from 20,760’ at 545 to 520 gpm, 140 rpm & 3000
to 3810 psi & 140 rpm to 14,065’.
12/02/2012
Continue to BROOH per K&M. Circulating at the casing shoe. POOH on elevators. L/D BHA #5.
12/03/2012
M/U BHA #6. RIH to 11350’ MD. Slip and cut drill line. RIH to bottom. Circulate and condition mud in
preparation for spotting breaker. Max trip gas of 140 units.
12/04/2012
Spot breaker fluid. POOH per K&M. Max trip gas of 20 units.
.
.
Density (ppg) Viscosity
out (sec/qt)
ROP
Set AtSize
178.9 X-65
Bit #
Current
in cP
Area:
Location:
Grade
Silt Siltst
4.23
Tuff
Footage
ROP (ft/hr)
Bit Type
96% Gallons/stroke @
Lst
EVAMAR
Weight
TFA
pH
%
MBT
Flow In (spm)
Flow In (gpm)
Hours
SPP (psi)
(ppb Eq)
Mud Data PV
Size
160'
160'
0'
Current Pump & Flow Data:
Current Depth:
24 Hour Progress:
$6,350.00
Yesterday's Depth:
Rig Activity:$2,550.00
Keener/Wimmer/BuchananReport For:
Daily Charges:
Max @ ft
Casing
Summary
WOB
Make
160'
Ss
20"
ShClystCly
Customer:
Well:
Avg
MWD Summary Depth
160' to 160'
Rig:
Total Charges:
Eni Petroleum
Chlorides
SI13-FN4
Spy Island
24 hr Max
North Slope
Doyon 15
AK-AM-000Job No.:
1
8-Nov-2012
24:00Time:
Report #:
Date:
(current)
Cht Lithology (%)
YP
(lb/100ft2)
Condition
Depth Mud Type mg/l
Coal Gvl
API FL Cor Solids
ml/30min
RPM
ECD
(ppg)
Avg
Depth in / out
Tools Min Max
* 10000 units = 100% Gas In Air
Logging Engineers:Emil Opitz / Leigh Ann Rasher
Connection
0
0
C-3
0
0
0
C-5n
(current)
Report By:
(max)
Emil Opitz
0
(max)
Chromatograph (ppm)
0
0
C-1
0
Minimum
C-4i
0
C-5iC-4nC-2
000
0
Sperry rigged up unit and calibrated gas equipment. Finished picking up 5" DP.
md
Average
0
Gas Summary
Units*
0
00000
Maximum
Depth
907-685-0772Unit Phone:
24 hr Recap:
TripBackground
.
.
Density (ppg) Viscosity
out (sec/qt)
Max
ml/30min
RPM
ECD
(ppg)
Avg
1,600
Depth in / out
Tools Min
mg/l
Coal Gvl
API FL
5.7
Cor Solids
Spud Mud
Depth Mud Type
Condition
YP
1
9.00
(lb/100ft2)
160'
113
(current)
Cht Lithology (%)
2
9-Nov-2012
24:00Time:
Report #:
Date:
Eni Petroleum
Chlorides
SP Motor 1.83*, GyroPulse, Telescope 825, ARC 825
SI13-FN4
Spy Island
24 hr Max
North Slope
Doyon 15
AK-AM-0009957275Job No.:
Customer:
Well:
Avg
MWD Summary Depth
160' to 446'
Rig:
Total Charges:
ShClystClySs
20"
2.2
Casing
Summary
WOB
37
Make
160'
Rig Activity:
1200.0
$2,810.00
286'
Keener/Wimmer/BuchananReport For:
Daily Charges:
595
Max @ ft
Size
160'
446'
286'
Current Pump & Flow Data:
Current Depth:
24 Hour Progress:
$9,160.00
Drilling Ahead 16"
Yesterday's Depth:
503 SPP (psi)
9.80
(ppb Eq)
Hughes MX-1 Milltooth
Mud Data
313'
PV
22.0
16"
MBT
Flow In (spm)
Hours
1.117
31
236.4
Lst
EVAMAR
Weight
TFA
pH
Flow In (gpm)
120 Gallons/stroke @
%
ROP (ft/hr)
Bit Type
96%4.23
Tuff
Footage
Silt Siltst
Grade
Area:
Location:
ROP
Set AtSize
178.9 X-65
Bit #
Current
in
389.6
cP
* 10000 units = 100% Gas In Air
Background
24 hr Recap:
1 Trip
Maximum
Depth
00000
0
Units*
Average
0
Gas Summary
Drill out conductor to 160'. P/U BHA #2. Drill to 310'. Rack back one stand and P/U Flex collar and Jars. Inspect Top
0
000
C-5iC-4nC-2C-1
0
Minimum
C-4i
0
(max)
Chromatograph (ppm)
0
0
(max)
Emil Opitz
0
Report By:
Drive. RIH and drill ahead. Take Gyro surveys as needed.
907-685-0772Unit Phone:
C-3
0
0
0
C-5n
(current)
Logging Engineers:Emil Opitz / Leigh Ann Rasher
Connection
0
0
.
.
Density (ppg) Viscosity
out (sec/qt)
ROP
Set AtSize
178.9 X-65
Bit #
Current
in
172.3
cP
Area:
Location:
Grade
Silt Siltst
4.23
Tuff
Footage
ROP (ft/hr)
Bit Type
96%@
%
191.6
Lst
EVAMAR
Weight
TFA
pH
Flow In (gpm)
MBT
Flow In (spm)
Hours
1.117
27
Hughes MX-1 Milltooth
Mud Data
1525'
PV
23.0
16"
Drilling Ahead 16"
Yesterday's Depth:
675 SPP (psi)
10.00
(ppb Eq)
162 Gallons/stroke
1357
Max @ ft
Size
446'
1820'
1374'
Current Pump & Flow Data:
Current Depth:
24 Hour Progress:
$11,970.00
Make
160'
Rig Activity:
1167.0
$2,810.00
482'
Keener/Wimmer/BuchananReport For:
Daily Charges:
4.3
Casing
Summary
WOB
41
ShClystCly
Customer:
Well:
Avg
MWD Summary Depth
446' to 1820'
Rig:
Total Charges:
Eni Petroleum
Chlorides
SP Motor 1.83*, GyroPulse, Telescope 825, ARC 825
SI13-FN4
Spy Island
24 hr Max
North Slope
Doyon 15
AK-AM-0009957275Job No.:
3
10-Nov-2012
24:00Time:
Report #:
Date:
Cht Lithology (%)Ss
121
(current)
20"
YP
1
9.10
(lb/100ft2)
160'
Condition
Spud Mud
Depth Mud Type
9.80
mg/l
9.34
Coal Gvl
API FL
5.0
Cor Solids
10.57
ml/30min
RPM
ECD
(ppg)
Avg
1,800
Depth in / out
Tools Min Max
* 10000 units = 100% Gas In Air
Logging Engineers:Emil Opitz / Leigh Ann Rasher
Connection
0
0
C-3
0
0
0
-
C-5n
(current)
Report By:
907-685-0772Unit Phone:
(max)
Emil Opitz
4535
2
(max)
Chromatograph (ppm)
0
0
C-1
0
Minimum
C-4i
34136
C-5iC-4nC-2
0014
0
Continue drilling ahead 16" surface section.
41
497'
1743'
Average
0
Gas Summary
0
00000
DepthUnits*
Maximum
-
24 hr Recap:
133 Trip
267
Background
.
.
Density (ppg) Viscosity
out (sec/qt)
Min Max
10.43
ml/30min
RPM
ECD
(ppg)
Avg
800
Depth in / out
Tools
Coal Gvl
API FL
5.2
Cor Solids
Condition
YP
1
9.30
(lb/100ft2)
160'
Spud Mud
(current)
20"
Cht Lithology (%)Ss
4
11-Nov-2012
24:00Time:
Report #:
Date:
Eni Petroleum
Chlorides
SP Motor 1.83*, GyroPulse, Telescope 825, ARC 825
SI13-FN4
Spy Island
24 hr Max
North Slope
Doyon 15
AK-AM-0009957275Job No.:
Customer:
Well:
Avg
MWD Summary Depth
1820' to 3735'
Rig:
Total Charges:
ShClystCly
5.7
Casing
Summary
WOB
36
160'
Rig Activity:
693.0
$2,810.00
2578'
Keener/Wimmer/BuchananReport For:
Daily Charges:
96
1915'
Current Pump & Flow Data:
Current Depth:
24 Hour Progress:
$14,780.00
Make
10.05
mg/l
9.81
Yesterday's Depth:
846 SPP (psi)
9.60
(ppb Eq)
202 Gallons/stroke
Max @ ft
1820'
3735'
Mud Data
3676'
PV
23.0
16"
BROOH
1842
Size
Depth Mud Type
MBT
Flow In (spm)
Hours
1.117
30
Hughes MX-1 Milltooth
258.4
Lst
EVAMAR
Weight
TFA
pH
Flow In (gpm)
@
%
ROP (ft/hr)
Bit Type
96%4.23
Tuff
Footage
Silt Siltst
Grade
Area:
Location:
ROP
Set AtSize
178.9 X-65
Bit #
Current
in cP
* 10000 units = 100% Gas In Air
779
Background 61
24 hr Recap:
47 Trip
Maximum
DepthUnits*
00000
00
Gas Summary
Continue drilling ahead 16" surface section to TD of 3735' MD. BROOH per K&M. .
158
3499'
1946'
Average
0
005535
C-5iC-4nC-2C-1
0
Minimum
C-4i
92095
(max)
Chromatograph (ppm)
0
0
(max)
Emil Opitz
17389
49
Report By:
907-685-0772Unit Phone:
C-3
0
0
0
-
C-5n
(current)
Logging Engineers:Emil Opitz / Leigh Ann Rasher
Connection
0
0
.
.
Density (ppg) Viscosity
out (sec/qt)
ROP
Set AtSize
178.9 X-65
Bit #
Current
in cP
Area:
Location:
25.0
Grade
4.23
Tuff
Footage
96%
ROP (ft/hr)
Bit Type
Silt Siltst
@
%
MBT
Flow In (spm)
Hours
1.117
27
Hughes MX-1 Milltooth
Mud Data
3732'
PV
24.0
16"
RIH w/casing
Size
Depth Mud Type
Yesterday's Depth:
SPP (psi)
9.40
(ppb Eq)
Gallons/stroke
Max @ ft
3735'
3735'
0'
Current Pump & Flow Data:
Current Depth:
24 Hour Progress:
$17,590.00
Make
mg/l
Rig Activity:$2,810.00
Keener/Wimmer/BuchananReport For:
Daily Charges:
Flow In (gpm)
22.40
WOB
30
160'
78
EVAMAR
Weight
TFA
ShClystCly
Customer:
Well:
Avg
MWD Summary Depth
3735' to 3735'
Rig:
Total Charges:
Eni Petroleum
Chlorides
SI13-FN4
Spy Island
24 hr Max
North Slope
Doyon 15
AK-AM-0009957275Job No.:
5
12-Nov-2012
24:00Time:
Report #:
Date:
Ss
20"
Cht Lithology (%)
(current)
Casing
Summary
Lst
YP
1
9.40
(lb/100ft2)
160' 3735' 3575'
Spud Mud
Condition
40.0
Coal Gvl
API FL
5.6
0-0-NO-A-E-I-NO-TD
Cor Solids
6.0
pH
ml/30min
RPM
ECD
(ppg)
Avg
800
Depth in / out
Tools Min Max
* 10000 units = 100% Gas In Air
Logging Engineers:Emil Opitz / Leigh Ann Rasher
Connection
0
0
C-3
0
0
0
-
C-5n
(current)
Report By:
907-685-0772Unit Phone:Emil Opitz
0
(max)
Chromatograph (ppm)
0
0
C-1
0
Minimum
C-4i
0
C-5iC-4nC-2
000
0
Average
0
Gas Summary
0
00000
Units*Depth
Maximum
1373
24 hr Recap:
-Trip
Continue to BROOH per K&M. L/D BHA #2.
(max)
Background
.
.
Density (ppg) Viscosity
out (sec/qt)
ROP
Set AtSize
178.9 X-65
Bit #
Current
in cP
Area:
Location:
L-80
25.0
Grade
4.23
Tuff
Footage
96%
BTC
ROP (ft/hr)
Bit Type
Silt Siltst
3735'
@
%
MBT
Flow In (spm)
Hours
1.117
15
Hughes MX-1 Milltooth
Mud Data PV
22.5
16"
R/D cement/casing
Size
Daily Charges:
Flow In (gpm)
Depth Mud Type
Yesterday's Depth:
SPP (psi)
8.50
(ppb Eq)
Gallons/stroke
Max @ ft Current Pump & Flow Data:
Current Depth:
24 Hour Progress:
$20,400.00 Keener/Wimmer/BuchananReport For:
Make
mg/l
Rig Activity:$2,810.00
22.40
WOB
16
160'
46
EVAMAR
Weight
TFA
20"
ShClystCly
Customer:
Well:
Avg
MWD Summary Depth
3735' to 3735'
Rig:
Total Charges:
Eni Petroleum
Chlorides
SI13-FN4
Spy Island
24 hr Max
North Slope
Doyon 15
AK-AM-0009957275Job No.:
6
13-Nov-2012
24:00Time:
Report #:
Date:
3735'
3735'
0'
Ss Cht Lithology (%)
13 3/8"
(current)
68.03720'
Casing
Summary
Lst
YP
1
9.30
(lb/100ft2)
160' 3735' 3575'
Spud Mud
Condition
40.0
Coal Gvl
API FL
5.4
0-0-NO-A-E-I-NO-TD
Cor Solids
5.8
pH
ml/30min
RPM
ECD
(ppg)
Avg
800
Depth in / out
Tools Min Max
* 10000 units = 100% Gas In Air
Logging Engineers:Emil Opitz / Leigh Ann Rasher
Connection
0
0
C-3
0
0
0
-
C-5n
(current)
Report By:
R/D cementing and casing equipment.
907-685-0772Unit Phone:Leigh Ann Rasher
0
(max)
Chromatograph (ppm)
0
0
C-1
0
Minimum
C-4iC-2
0
C-5iC-4n
000
0
Average
0
Gas Summary
0
00000
Units*Depth
Maximum
54
24 hr Recap:
-Trip
R/U for running casing. RIH w/ 13 3/8" casing. R/U and prepare for cement. Cement casing. L/D landing joint and
(max)
Background
.
.
Density (ppg)Viscosity
out (sec/qt)
Min Max
ml/30min
RPM
ECD
(ppg)
Avg
800
Depth in / out
Tools
Coal Gvl
API FL
5.4
0-0-NO-A-E-I-NO-TD
Cor Solids
5.8
pH
Condition
40.0
YP
1
9.30
(lb/100ft2)
160' 3735' 3575'
Spud Mud
(current)
68.03720'
Casing
Summary
LstCht Lithology (%)
13 3/8"
Ss
Job No.:
7
14-Nov-2012
24:00Time:
Report #:
Date:
3735'
3735'
0'
Total Charges:
Eni Petroleum
Chlorides
SI13-FN4
Spy Island
24 hr Max
North Slope
Doyon 15
AK-AM-0009957275
Customer:
Well:
Avg
MWD Summary Depth
3735' to 3735'
Rig:
ShClystCly
22.40
WOB
15
160'
45
EVAMAR
Weight
TFA
20"
Make
mg/l
Rig Activity:$3,110.00
Current Pump & Flow Data:
Current Depth:
24 Hour Progress:
$23,510.00 Keener/Wimmer/BuchananReport For:
Depth Mud Type
Yesterday's Depth:
SPP (psi)
8.00
(ppb Eq)
Gallons/stroke
Max @ ft
PV
22.5
16"
Testing BOPE
Size
Daily Charges:
Flow In (gpm)
Flow In (spm)
Hours
Gas Summary
1.117
15
Hughes MX-1 Milltooth
Mud Data
@
%
MBT
ROP (ft/hr)
Bit Type
Silt Siltst
3735'
96%
BTC
4.23
Tuff
Footage
25.0
Grade
Area:
Location:
L-80
ROP
Set AtSize
178.9 X-65
Bit #
Current
in cP
*10000 units = 100% Gas In Air
Background -
24 hr Recap:
-Trip
R/D casing equipment. Clean out and N/D diverter system. N/U well head and BOPE. Service top drive. R/U and test
(max)
Maximum
DepthUnits*
00000
0 0
Average
0
000
0
C-5iC-4nC-1
0
Minimum
C-4iC-2
(max)
Chromatograph (ppm)
0
0
Leigh Ann Rasher
0
Report By:
BOPE.
907-685-0772Unit Phone:
C-3
0
0
0
-
C-5n
(current)
Logging Engineers:Emil Opitz / Leigh Ann Rasher
Connection
0
0
.
.
Density (ppg) Viscosity
out (sec/qt)
ROP
Set AtSize
178.9 X-65
Bit #
Current
in
284.0
cP
Area:
Location:
L-80
25.0
Grade
4.23
Tuff
Footage
96%
BTC
ROP (ft/hr)
Bit Type
Silt Siltst
3825'
@
%
MBT
Flow In (spm)
Hours
1.117
10
Hughes MX-1 Milltooth
Mud Data PV
-
16"
Drill 12.25" Section
1307
Size
Daily Charges:
171.7 Flow In (gpm)
Depth Mud Type
Yesterday's Depth:
911 SPP (psi)
9.50
(ppb Eq)
215 Gallons/stroke
Max @ ft Current Pump & Flow Data:
Current Depth:
24 Hour Progress:
$27,920.00 Keener/Amend/BuchananReport For:
Make
9.78
mg/l
9.62
Rig Activity:
338.2
$4,410.00
4075'
22.40
WOB
2
20
160'
50
EVAMAR
Weight
TFA
20"
ShClystCly
15
Customer:
Well:
Avg
MWD Summary Depth
3735' to 4100'
Rig:
Total Charges:
Eni Petroleum
Chlorides
Xceed 900, TeleScope 825, ARC 825
SI13-FN4
Spy Island
24 hr Max
North Slope
Doyon 15
AK-AM-0009957275Job No.:
8
15-Nov-2012
24:00Time:
Report #:
Date:
3735'
4100'
365'
Ss
85
3735'
Cht Lithology (%)
13 3/8"
(current)
68.03720'
Casing
Summary
Lst
YP
1
9.20
(lb/100ft2)
160' 3735' 3575'
LSND
Smith MDSi716 LHEBPX PDC
Condition
40.0
Coal Gvl
API FL
7.0
0-0-NO-A-E-I-NO-TD
Cor Solids
4.0
pH
9.93
ml/30min
RPM
ECD
(ppg)
Avg
900
Depth in / out
Tools Min Max
12.25" 1.167
* 10000 units = 100% Gas In Air
Logging Engineers:Leigh Ann Rasher/ Alexander Kalenuik
Connection
0
0
C-3
0
0
0
-
C-5n
(current)
Report By:
2500psi for 30 min. Wash to 3735', drill shoe track and 20' new hole. Displace well and perform FIT to 12.8 ppg EMW. Drill ahead to
907-685-0772Unit Phone:Leigh Ann Rasher
3257
5
(max)
Chromatograph (ppm)
0
0
C-1
0
Minimum
C-4iC-2
3284
C-5iC-4n
0011
0
29
3756'
3986'
Average
0
Gas Summary
0
00000
Units*Depth
Maximum
10
24 hr Recap:
27 Trip
Cont. test BOPE. R/D BOPE test equip. M/U BHA #3, shallow test BHA @ 253'. RIH to 3614', CBU, test casing to
(max)
4100' MD as of midnight. Max gas observed was 46 units.
46
Background
.
.
Density (ppg) Viscosity
out (sec/qt)
Min Max
12.25" 1.167
10.47
ml/30min
RPM
ECD
(ppg)
Avg
1,200
Depth in / out
Tools
Coal Gvl
API FL
5.0
0-0-NO-A-E-I-NO-TD
Cor Solids
5.0
pH
Condition
40.0
YP
1
9.25
(lb/100ft2)
160' 3735' 3575'
LSND
Smith MDSi716 LHEBPX PDC
(current)
68.03720'
Casing
Summary
Lst
95
3735'
Cht Lithology (%)
13 3/8"
Ss
Job No.:
9
16-Nov-2012
24:00Time:
Report #:
Date:
4100'
6710'
2610'
Total Charges:
Eni Petroleum
Chlorides
Xceed 900, TeleScope 825, ARC 825
SI13-FN4
Spy Island
24 hr Max
North Slope
Doyon 15
AK-AM-0009957275
Customer:
Well:
Avg
MWD Summary Depth
4100' to 6710'
Rig:
ShClystCly
5
22.40
WOB
2
27
160'
56
EVAMAR
Weight
TFA
20"
Make
10.10
mg/l
9.64
Rig Activity:
690.0
$3,410.00
6609'
Current Pump & Flow Data:
Current Depth:
24 Hour Progress:
$31,330.00 Keener/Amend/BuchananReport For:
Depth Mud Type
Yesterday's Depth:
905 SPP (psi)
9.80
(ppb Eq)
214 Gallons/stroke
Max @ ft
PV
15.0
16"
Drill 12.25" Section
1862
Size
Daily Charges:
31142.0 Flow In (gpm)
Flow In (spm)
Hours
1.117
14
Hughes MX-1 Milltooth
Mud Data
@
%
MBT
ROP (ft/hr)
Bit Type
Silt Siltst
6337'
96%
BTC
4.23
Tuff
Footage
25.0
Grade
Area:
Location:
L-80
ROP
Set AtSize
178.9 X-65
Bit #
Current
in
356.0
cP
* 10000 units = 100% Gas In Air
101
Background -
24 hr Recap:
6 Trip
Drill ahead from 4100' MD to 6710' MD as of midnight. Max gas observed was 101 units at 4701' MD.
(max)
Maximum
DepthUnits*
00000
00
Gas Summary
27
6715'
4701'
Average
0
0010
12426
C-5iC-4nC-1
0
Minimum
C-4iC-2
(max)
Chromatograph (ppm)
0
0
Leigh Ann Rasher
2966
3
Report By:
907-685-0772Unit Phone:
C-3
0
0
0
-
C-5n
(current)
Logging Engineers:Leigh Ann Rasher/ Alexander Kalenuik
Connection
0
0
.
.
Density (ppg) Viscosity
out (sec/qt)
ROP
Set AtSize
178.9 X-65
Bit #
Current
in
154.0
cP
Area:
Location:
L-80
25.0
Grade
4.23
Tuff
Footage
96%
BTC
ROP (ft/hr)
Bit Type
Silt Siltst
8660'
@
%
MBT
Flow In (spm)
Hours
1.117
12
Hughes MX-1 Milltooth
Mud Data PV
18.8
16"
Drill 12.25" Section
2101
Size
Daily Charges:
273.6 Flow In (gpm)
Depth Mud Type
Yesterday's Depth:
903 SPP (psi)
9.70
(ppb Eq)
214 Gallons/stroke
Max @ ft Current Pump & Flow Data:
Current Depth:
24 Hour Progress:
$34,740.00 Keener/Amend/BuchananReport For:
Make
10.38
mg/l
10.14
Rig Activity:
1125.2
$3,410.00
7895'
22.40
WOB
2
28
160'
51
EVAMAR
Weight
TFA
20"
ShClystCly
20
Customer:
Well:
Avg
MWD Summary Depth
6710' to 8935'
Rig:
Total Charges:
Eni Petroleum
Chlorides
Xceed 900, TeleScope 825, ARC 825
SI13-FN4
Spy Island
24 hr Max
North Slope
Doyon 15
AK-AM-0009957275Job No.:
10
17-Nov-2012
24:00Time:
Report #:
Date:
6710'
8935'
2225'
Ss
80
3735'
Cht Lithology (%)
13 3/8"
(current)
68.03720'
Casing
Summary
Lst
YP
1
9.35
(lb/100ft2)
160' 3735' 3575'
LSND
Smith MDSi716 LHEBPX PDC
Condition
40.0
Coal Gvl
API FL
5.4
0-0-NO-A-E-I-NO-TD
Cor Solids
5.5
pH
10.61
ml/30min
RPM
ECD
(ppg)
Avg
1,700
Depth in / out
Tools Min Max
12.25" 1.167
* 10000 units = 100% Gas In Air
Logging Engineers:Leigh Ann Rasher/ Alexander Kalenuik
Connection
0
0
C-3
0
0
0
-
C-5n
(current)
Report By:
907-685-0772Unit Phone:Leigh Ann Rasher
1482
3
(max)
Chromatograph (ppm)
0
0
C-1
0
Minimum
C-4iC-2
4253
C-5iC-4n
0014
0
15
8806'
8286'
Average
0
Gas Summary
0
00000
Units*Depth
Maximum
-
24 hr Recap:
11 Trip
Drill ahead from 6710' MD to 8935' MD as of midnight. Max gas observed was 41 units at 8286' MD.
(max)
41
Background
.
.
Density (ppg) Viscosity
out (sec/qt)
Min Max
12.25" 1.167
10.44
ml/30min
RPM
ECD
(ppg)
Avg
1,300
Depth in / out
Tools
Coal Gvl
API FL
5.4
0-0-NO-A-E-I-NO-TD
Cor Solids
6.0
pH
Condition
40.0
YP
1
9.40
(lb/100ft2)
160' 3735' 3575'
LSND
Smith MDSi716 LHEBPX PDC
(current)
68.03720'
Casing
Summary
Lst
3735'
Cht Lithology (%)
13 3/8"
Ss
Job No.:
11
18-Nov-2012
24:00Time:
Report #:
Date:
8935'
9494'
559'
Total Charges:
Eni Petroleum
Chlorides
Xceed 900, TeleScope 825, ARC 825
SI13-FN4
Spy Island
24 hr Max
North Slope
Doyon 15
AK-AM-0009957275
Customer:
Well:
Avg
MWD Summary Depth
8935' to 9494'
Rig:
ShClystCly
22.40
WOB
2
23
160'
52
EVAMAR
Weight
TFA
20"
Make
10.26
mg/l
10.01
Rig Activity:
479.0
$3,410.00
9043'
Current Pump & Flow Data:
Current Depth:
24 Hour Progress:
$38,150.00 Keener/Amend/BuchananReport For:
Depth Mud Type
Yesterday's Depth:
912 SPP (psi)
9.70
(ppb Eq)
215 Gallons/stroke
Max @ ft
PV
17.5
16"
BROOH
1761
Size
Daily Charges:
151.1 Flow In (gpm)
Flow In (spm)
Hours
1.117
15
Hughes MX-1 Milltooth
Mud Data
@
%
MBT
ROP (ft/hr)
Bit Type
Silt Siltst
9494'
96%
BTC
4.23
Tuff
Footage
25.0
Grade
Area:
Location:
L-80
ROP
Set AtSize
178.9 X-65
Bit #
Current
in cP
* 10000 units = 100% Gas In Air
46
Background 36
24 hr Recap:
-Trip
Drill ahead from 8935' MD to 9494' MD. CBU. BROOH due to Xceed tool failure. Max gas observed was 46 units at
(max)
Maximum
DepthUnits*
00000
00
Gas Summary
16
9434'
9400'
Average
0
0013
3134
C-5iC-4nC-1
0
Minimum
C-4iC-2
(max)
Chromatograph (ppm)
0
0
Leigh Ann Rasher
1600
3
Report By:
9400' MD.
907-685-0772Unit Phone:
C-3
0
0
0
-
C-5n
(current)
Logging Engineers:Leigh Ann Rasher/ Alexander Kalenuik
Connection
0
0
.
.
Density (ppg) Viscosity
out (sec/qt)
9494' 5758' 10 180 3-4-CT-A-X-I-BT-DTF2Smith MDSi716 LHEBPX PDC 12.25" 1.167 43.70 3735'
ROP
Set AtSize
178.9 X-65
Bit #
Current
in cP
Area:
Location:
L-80
25.0
Grade
4.23
Tuff
Footage
96%
BTC
ROP (ft/hr)
Bit Type
Silt Siltst
9494'
@
%
MBT
Flow In (spm)
Hours
1.117
14
Hughes MX-1 Milltooth
Mud Data PV
18.0
16"
RIH w/ BHA #4
Size
Daily Charges:
Flow In (gpm)
Depth Mud Type
Yesterday's Depth:
SPP (psi)
9.70
(ppb Eq)
Gallons/stroke
Max @ ft Current Pump & Flow Data:
Current Depth:
24 Hour Progress:
$41,560.00 Keener/Amend/BuchananReport For:
Make
mg/l
Rig Activity:$3,410.00
22.40
WOB
3
28
160'
48
EVAMAR
Weight
TFA
20"
ShClystCly
Customer:
Well:
Avg
MWD Summary Depth
9494' to 9494'
Rig:
Total Charges:
Eni Petroleum
Chlorides
Xceed 900, TeleScope 825, ARC 825
SI13-FN4
Spy Island
24 hr Max
North Slope
Doyon 15
AK-AM-0009957275Job No.:
12
19-Nov-2012
24:00Time:
Report #:
Date:
9494'
9494'
0'
Ss
9494'
Cht Lithology (%)
13 3/8"
(current)
68.03720'
Casing
Summary
Lst
YP
1
9.30
(lb/100ft2)
160' 3735' 3575'
LSND
Hycalog SKHI716D-E4C PDC
Condition
40.0
Coal Gvl
API FL
5.4
0-0-NO-A-E-I-NO-TD
Cor Solids
6.0
pH
ml/30min
RPM
ECD
(ppg)
Avg
1,400
Depth in / out
Tools Min Max
12.25" 1.167
* 10000 units = 100% Gas In Air
Logging Engineers:Leigh Ann Rasher/ Alexander Kalenuik
Connection
0
0
C-3
0
0
0
-
C-5n
Report By:
907-685-0772Unit Phone:Leigh Ann Rasher
0
Chromatograph (ppm)
0
0
C-1
0
Minimum
C-4iC-2
0
C-5iC-4n
000
0
Average
0
Gas Summary
0
00000
Units*Depth
(current)
Maximum
20
24 hr Recap:
-Trip
BROOH to shoe, monitor well static. BROOH to 1000' MD, CBU x3. POOH, C/O BHA. RIH to 3700', Cut & slip drill line.
Background
.
.
Density (ppg) Viscosity
out (sec/qt)
Max
12.25" 1.167
ECD
(ppg)
Avg
1,400
Depth in / out
Tools Min
Coal Gvl
API FL
4.8
0-0-NO-A-E-I-NO-TD
Cor Solids
7.0
pH
Condition
40.01
9.50
(lb/100ft2)
160' 3735' 3575'
LSND
Hycalog SKHI716D-E4C PDC
ml/30min
Cht Lithology (%)
13 3/8"
(current)
68.03720'
Ss
9494'
11453'
1959'
Lst
13
20-Nov-2012
24:00Time:
Report #:
Date:
Eni Petroleum
Chlorides
Xceed 900, TeleScope 825, ARC 825
SI13-FN4
Spy Island
24 hr Max
North Slope
Doyon 15
AK-AM-0009957275Job No.:
Customer:
Well:
Avg
MWD Summary Depth
9494' to 11453'
Rig:
ShClystCly
3
26
160'
54
EVAMAR
Weight
TFA
20"
9494'
Casing
Summary
1152.5
$3,410.00
11322'
22.40
WOB
Total Charges:
YP
10.62
RPM
24 Hour Progress:
$44,970.00 Keener/Amend/BuchananReport For:
Make
10.30
mg/l
9.78
Rig Activity:
Yesterday's Depth:
908 SPP (psi)
9.60
(ppb Eq)
214 Gallons/stroke
Max @ ft Current Pump & Flow Data:
Current Depth:
Mud Data PV
17.5
16"
BROOH
2567
Size
Daily Charges:
339.9 Flow In (gpm)
MBT
Flow In (spm)
Hours
1.117
13
Hughes MX-1 Milltooth
%Depth Mud Type
ROP (ft/hr)
Bit Type
Silt Siltst
10987'
4.23
Tuff
Footage
96%
BTC
@
25.0
Grade
Area:
Location:
L-80
cP
ROP
Set AtSize
178.9 X-65
Bit #
Current
in
3735'9494' 5758' 10 180 3-4-CT-A-X-I-BT-DTF2Smith MDSi716 LHEBPX PDC 12.25" 1.167 43.70
* 10000 units = 100% Gas In Air
531
Background 27
24 hr Recap:
-Trip
RIH to 9400' MD, wash to 9492'. Drill ahead to 11453' MD, CBU x4.5 while POOH to 11000' MD. Max gas observed was
(current)
Units*
89148122110111
00
Gas Summary
121
9611'
10202'
Average
603
0014
C-4n
66329
C-5iDepth
Maximum
C-1
98
Minimum
C-4iC-2
Chromatograph (ppm)
151
16
Leigh Ann Rasher
10824
2
Report By:
531 units at 10202' MD.
907-685-0772Unit Phone:
0
C-3
0
0
19
-
C-5n
Logging Engineers:Leigh Ann Rasher/ Alexander Kalenuik
Connection
0
.
.
Density (ppg) Viscosity
out (sec/qt)
9494' 5758' 10 180 3-4-CT-A-X-I-BT-DTF2Smith MDSi716 LHEBPX PDC 12.25" 1.167 43.70
ROP
Set AtSize
178.9 X-65
Bit #
Current
in
Area:
Location:
L-80
25.0
Grade
96%
BTC
@4.23
Tuff
FootageBit Type
Silt Siltst
11453'
Depth Mud Type
ROP (ft/hr)
Flow In (spm)
Hours
1.117
12
Hughes MX-1 Milltooth
%
Mud Data PV
18.0
16"
L/D BHA #4
Size
Daily Charges:
Flow In (gpm)
Yesterday's Depth:
SPP (psi)
9.80
(ppb Eq)
Gallons/stroke
Max @ ft Current Pump & Flow Data:
Current Depth:
24 Hour Progress:
$48,680.00 Ross/Perry/Amend/BuchananReport For:
Make
mg/l
Rig Activity:$3,710.00
22.40
WOB
Total Charges:
YP
RPM
3
24
160'
48
EVAMAR
Weight
TFA
20"
9494'
Casing
Summary
ShClystCly
Customer:
Well:
Avg
MWD Summary Depth
11453' to 11453'
Rig:
Eni Petroleum
Chlorides
Xceed 900, TeleScope 825, ARC 825
SI13-FN4
Spy Island
24 hr Max
North Slope
Doyon 15
AK-AM-0009957275Job No.:
14
21-Nov-2012
24:00Time:
Report #:
Date:
11453'
11453'
0'
LstSs Cht Lithology (%)
13 3/8"
(current)
68.03720'
1
9.40
(lb/100ft2)
160' 3735' 3575'
LSND
Hycalog SKHI716D-E4C PDC
ml/30min
Condition
40.0
Coal Gvl
API FL
5.2
0-0-NO-A-E-I-NO-TD
Cor Solids
7.0
pH
ECD
(ppg)
Avg
1,400
Depth in / out
Tools Min
MBT
cP
3735'
Max
12.25" 1.167
* 10000 units = 100% Gas In Air
Leigh Ann Rasher/ Alexander Kalenuik
Connection
0
0
C-3
0
0
0
-
C-5n
Report By:
907-685-0772Unit Phone:Logging Engineers:Leigh Ann Rasher
0
Chromatograph (ppm)
0
0
C-1
0
Minimum
C-4iC-2
0
0
C-4n C-5i
0
Depth
Maximum
Average
00 0
Gas Summary
0
00000
Units*
(current)
64
24 hr Recap:
-Trip
BROOH from 11,000' MD to 1,000' MD per K&M rep. CBU x2, POOH, L/D BHA #4.
Background
.
.
Density (ppg) Viscosity
out (sec/qt)
Max
12.25" 0.969 6.50 11453'
Avg
1,400
Depth in / out
Tools
1-1-NO-A-X-NO-TD
Min
MBT
cP
3735'
Coal Gvl
API FL
5.2
0-0-NO-A-E-I-NO-TD
Cor Solids
7.0
200
pH
Condition
40.01
9.40
(lb/100ft2)
L-80
160' 3735' 3575'
LSND
Hycalog SKHI716D-E4C PDC
ml/30min
13 3/8"
1960'
(current)
68.03720'
9 5/8"
Ss
11453'
11453'
0'
40.0
Lst
15
22-Nov-2012
24:00Time:
Report #:
Date:
Eni Petroleum
Chlorides
SI13-FN4
Spy Island
24 hr Max
North Slope
Doyon 15
AK-AM-0009957275Job No.:
Customer:
Well:
Avg
MWD Summary Depth
11453' to 11453'
Rig:
9494'
Casing
Summary
ShClystClyCht Lithology (%)
RPM
3
24
160'
48
EVAMAR
Weight
TFA
20"
$3,410.00
22.40
WOB
Total Charges:
YP
ECD
(ppg)
24 Hour Progress:
$52,090.00 Ross/Perry/Amend/BuchananReport For:
Make
10
mg/l
Rig Activity:
Yesterday's Depth:
SPP (psi)
9.70
(ppb Eq)
Gallons/stroke
Max @ ft Current Pump & Flow Data:
Current Depth:
PV
17.5
16"
RIH w/ 9 5/8" casing
Size
Daily Charges:
Flow In (gpm)
Hours
1.117
12
Hughes MX-1 Milltooth
%
Mud Data
Depth Mud Type
ROP (ft/hr)
4.23
Tuff
Hydril
Footage
Siltst
Flow In (spm) 96%
BTC
@
25.0
Grade
L-80
Area:
Location:
Bit Type
X-65
Bit #
Current
in
ROP
Set AtSize
178.9
Silt
11453'
9494' 5758' 10 180 3-4-CT-A-X-I-BT-DTF2Smith MDSi716 LHEBPX PDC 12.25" 1.167 43.70
* 10000 units = 100% Gas In Air
Background 14
24 hr Recap:
-Trip
L/D BHA #4. R/U casing equip. RIH w/ 9 5/8" casing.
(current)
Units*
00000
00
Gas Summary
Average
00
Depth
Maximum
C-4n C-5i
0
0
00
C-4i
Chromatograph (ppm)
C-1
Minimum
C-2
0
0
0
907-685-0772Unit Phone:Logging Engineers:Leigh Ann RasherReport By:
C-3
0
0
0
-
C-5n
Leigh Ann Rasher/ Alexander Kalenuik
Connection
0
0
.
.
Density (ppg) Viscosity
out (sec/qt)
9494' 5758' 10 180 3-4-CT-A-X-I-BT-DTF2Smith MDSi716 LHEBPX PDC 12.25" 1.167
ROP
Set AtSize
178.9
Silt
11453'
43.70
Current
in
Area:
Location:
Bit Type
Grade
L-80
X-65
25.0
Flow In (spm)96%
BTC
@
Bit #
11446'
4.23
Tuff
Hydril
Footage
Siltst
Depth Mud Type
ROP (ft/hr)
Mud Data
Hours
1.117
9
Hughes MX-1 Milltooth 16"
Set E-slips
Size
Daily Charges:
Flow In (gpm)
%
Yesterday's Depth:
SPP (psi)
9.60
(ppb Eq)
Gallons/stroke
Max @ ft Current Pump & Flow Data:
Current Depth:
24 Hour Progress:
$55,500.00 Ross/Perry/Amend/BuchananReport For:
Make
10
mg/l
Rig Activity:
20"
$3,410.00
22.40
WOB
Total Charges:
YP
ECD
(ppg)
PV
Lithology (%)
RPM
3
13
160'
42
EVAMAR
Weight
TFA
ClystClyCht
Customer:
Well:
Avg
MWD Summary Depth
11453' to 11453'
Rig:
Eni Petroleum
Chlorides
SI13-FN4
Spy Island
24 hr Max
North Slope
Doyon 15
AK-AM-0009957275Job No.:
16
23-Nov-2012
24:00Time:
Report #:
Date:
11453'
11453'
0'
40.0
Lst
9 5/8"
Ss
13 3/8"
1960'
(current)
68.03720'
9494'
Casing
Summary
Sh
1
9.40
(lb/100ft2)
L-80
160' 3735' 3575'
LSND
Hycalog SKHI716D-E4C PDC
ml/30min
Condition
40.0
Coal Gvl
API FL
5.6
0-0-NO-A-E-I-NO-TD
Cor Solids
6.8
200
pH
Avg
1,400
Depth in / out
Tools
1-1-NO-A-X-NO-TD
Min
MBT
cP
3735'
15.0
Max
12.25" 0.969 6.50 11453'
* 10000 units = 100% Gas In Air
Connection
0
0
0
0
-
C-5n
Report By:
push, 203 bbls cement, 10 bbls water and bump plug with 850 bbls LSND. Test to 1000 psi for 10 min, perform 20 bbl injectivity
907-685-0772Unit Phone:Logging Engineers:Leigh Ann RasherLeigh Ann Rasher/ Alexander Kalenuik
0
0
0
Chromatograph (ppm)
C-1
Minimum
C-2
00
C-4i
0
C-3
0
C-4n C-5i
Average
00
Gas Summary
0
Depth
Maximum
0
000000
Units*
(current)
-
24 hr Recap:
-Trip
RIH w/ casing to 11446' MD. R/U cement head & lines. Fill casing per well plan, condition mud. Pump 110 bbls mud
test down annulus w/ LSND. R/D cement equip, N/D BOPE, set E-slips.
Background
.
.
Density (ppg) Viscosity
out (sec/qt)
Max
12.25" 0.969 6.50 11453'
Avg
1,400
Depth in / out
Tools
1-1-NO-A-X-NO-TD
Min
MBT
cP
3735'
17.5
Coal Gvl
API FL
5.6
0-0-NO-A-E-I-NO-TD
Cor Solids
7.0
200
pH
Condition
40.01
9.40
(lb/100ft2)
L-80
160' 3735' 3575'
LSND
Hycalog SKHI716D-E4C PDC
ml/30min
13 3/8"
1960'
(current)
68.03720'
9494'
Casing
Summary
Sh
9 5/8"
Ss
11453'
11453'
0'
40.0
Lst
17
24-Nov-2012
24:00Time:
Report #:
Date:
Eni Petroleum
Chlorides
SI13-FN4
Spy Island
24 hr Max
North Slope
Doyon 15
AK-AM-0009957275Job No.:
Customer:
Well:
Avg
MWD Summary Depth
11453' to 11453'
Rig:
ClystClyCht Lithology (%)
RPM
3
15
160'
43
EVAMAR
Weight
TFA
$3,410.00
22.40
WOB
Total Charges:
YP
ECD
(ppg)
PV
24 Hour Progress:
$58,910.00 Ross/Perry/Amend/BuchananReport For:
Make
10
mg/l
Rig Activity:
Yesterday's Depth:
SPP (psi)
9.50
(ppb Eq)
Gallons/stroke
Max @ ft Current Pump & Flow Data:
Current Depth:
Test BOPE
Size
Daily Charges:
Flow In (gpm)
%
Hours
1.117
9
Hughes MX-1 Milltooth 16"
Depth Mud Type
ROP (ft/hr)
Mud Data
Bit #
11446'
4.23
Tuff
Hydril
Footage
Siltst
25.0
Flow In (spm)96%
BTC
@
X-6520"
Grade
L-80
Area:
Location:
Bit Type
11453'
43.70
Current
in
ROP
Set AtSize
178.9
Silt
9494' 5758' 10 180 3-4-CT-A-X-I-BT-DTF2Smith MDSi716 LHEBPX PDC 12.25" 1.167
* 10000 units = 100% Gas In Air
Background -
24 hr Recap:
-Trip
Finish e-slips. N/U BOPE, freeze protect annulus, and stand back 4.5" DP. C/O rams in BOPE, R/U and test BOPE.
(current)
Units*
000000
00
Gas Summary
0
Depth
Maximum
Average
0
C-3
00
C-4n C-5i
00
C-4i
0
Chromatograph (ppm)
C-1
Minimum
C-2
Leigh Ann Rasher/ Alexander Kalenuik
0
0
907-685-0772Unit Phone:Logging Engineers:Leigh Ann RasherReport By:
-
C-5n
Connection
0
0
0
0
.
.
Density (ppg) Viscosity
out (sec/qt)
9494' 5758' 10 180 3-4-CT-A-X-I-BT-DTF2Smith MDSi716 LHEBPX PDC 12.25" 1.167
ROP
Set AtSize
178.9
Silt
11453'
43.70
Current
in
Area:
Location:
Bit Type
L-80
20"
Grade
Flow In (spm) 96%
BTC
@
X-65
Bit #
11446'
4.23
Tuff
Hydril
Footage
Siltst
25.0
Depth Mud Type
ROP (ft/hr)
Mud Data
Hours
1.117
9
Hughes MX-1 Milltooth 16"
Cement bond logs
Size
Daily Charges:
Flow In (gpm)
%
Yesterday's Depth:
SPP (psi)
(ppb Eq)
Gallons/stroke
Max @ ft Current Pump & Flow Data:
Current Depth:
24 Hour Progress:
$62,320.00 Ross/Perry/Wimmer/BuchananReport For:
Make
10
mg/l
Rig Activity:$3,410.00
22.40
WOB
Total Charges:
YP
ECD
(ppg)
PV
Lithology (%)
RPM
3
16
160'
45
EVAMAR
Weight
TFA
ClystClyCht
Customer:
Well:
Avg
MWD Summary Depth
11453' to 11453'
Rig:
Eni Petroleum
Chlorides
Xceed 675, Ecoscope 675, Telescope 675, SonicVision 675
SI13-FN4
Spy Island
24 hr Max
North Slope
Doyon 15
AK-AM-0009957275Job No.:
18
25-Nov-2012
24:00Time:
Report #:
Date:
11453'
11453'
0'
40.0
Lst
9 5/8"
Ss
13 3/8"
1960'
(current)
68.03719'
9494'
Casing
Summary
Sh
1
9.40
(lb/100ft2)
L-80
160' 3735' 3575'
LSND
Hycalog SKHI716D-E4C PDC
ml/30min
Condition
40.0
Coal Gvl
API FL
5.6
0-0-NO-A-E-I-NO-TD
Cor Solids
200
pH
Avg
Depth in / out
Tools
1-1-NO-A-X-NO-TD
Min
MBT
cP
3735'
Max
12.25" 0.969 6.50 11453'
* 10000 units = 100% Gas In Air
Connection
0
0
0
0
-
C-5n
Report By:
907-685-0772Unit Phone:Logging Engineers:Leigh Ann RasherLeigh Ann Rasher/ Alexander Kalenuik
0
0
0
Chromatograph (ppm)
C-1
Minimum
00
C-4i
0
C-4n C-5iC-2 C-3
0
Average
00
Gas Summary
0
Depth
Maximum
0
000000
Units*
(current)
-
24 hr Recap:
-Trip
Test BOPE. R/D testing equip. M/U BHA #5. RIH & shallow test @ 280' MD. RIH to 8533' MD & CBL to 9407' MD.
Background
.
.
Density (ppg) Viscosity
out (sec/qt)
ECD
(ppg)
Tools
Xceed 675, EcoScope 675, TeleScope 675, sonicVision 675
API FL
Depth
11586'to11453' 10.9210.6410.83
Avg Min Max
11473' FazePro
Depth Mud Type
YP Cor Solids
(lb/100ft2)
3.252.50
Mud (lb/bbl)ml/30min
4
10
Cht Silt Siltst
90
HYDRIL
Ss
-
Lst
EVAMAR
Make
9.40 9.40 65/35 10
11453'
WOB
19
26-Nov-2012
24:00:00Time:
Report #:
Date:
AK-AM-0009957275
Customer:
Well:
Avg
0.902
1446
8.75"
PVOil / Water
Footage
ENI Petroleum
SI13-FN4
Spy Island
24 hr Max
North Slope
181.6
Lithology (%)
(current)
ShClyst
68.0
Weight
Size
Hycalog SKH616M-E1D PDC
160'
3719'
11446'
TuffGvlCoal
$4,410.00
9.9
Alkal Lime
$66,730.00 Report For:
Ratio cP
Ross/Wimmer/Buchanan
Flow In (gpm)
Total Charges:
11453'
11586'
133'
Current Depth:
24 Hour Progress:
Drilling AheadRig Activity:
Doyon 15
Daily Charges:
Current Pump & Flow Data: Max @ ft Current
11457'165.6
4.23 Flow In (spm)
MWD Summary
Bit Type TFA
Cly
RPM Hours Depth in / out
%
Casing
Summary
Condition
in
Mud Data
@
Yesterday's Depth:
340.0
Rig:
Job No.:
ROP (ft/hr)
Area:
Location:
96%
450
108
SPP (psi)
Gallons/stroke
2286
ROP
Set AtSize
178.9 X-65
Bit #
L-80
Grade
L-80
40.0
20"
13 3/8"
9 5/8"
BTC
* 10000 units = 100% Gas In Air
Connection(max)
Chromatograph (ppm)
24 hr Recap:
48Background Trip
87
46 30 8
0
20
C-4i C-4n C-5n
00
13183 117
Gas Summary
md
Networking/Communication issues with Canrig Rigwatch. We are unable to transmit data to, nor receive data from, Rigwatch.
A Canrig Technician is due to arrive on location first thing in the morning on 11-27-2012.
new formation to 11473' MD. Perform FIT to 13.0 ppg EMW. Drill ahead.
CBL to 11356' MD. Casing pressure test to 3000psi for 30 min. Displace to OBM. Drill out cement, and then 20' MD of
38
Units*
13
11532'291
11508'
17
58
25Minimum
Average 46619
6
Depth C-2 C-3
786
C-1
30Maximum70
907-685-0772Unit Phone:
15
Emil OpitzReport By:Logging Engineers:Emil Opitz / A. Paul Kalenuik
(max)(current)
C-5i
.
.
Density (ppg) Viscosity
out (sec/qt)
20"
13 3/8"
9 5/8"
BTC
L-80
Grade
L-80
40.0
ROP
Set AtSize
178.9 X-65
Bit #
Area:
Location:
96%
551
131
SPP (psi)
Gallons/stroke
3294
@
Yesterday's Depth:
288.0
Rig:
Job No.:
ROP (ft/hr)
Condition
in
Mud Data
Depth in / out
%
Casing
Summary
RPM HoursBit Type TFA
Cly
Current Pump & Flow Data: Max @ ft Current
11767'290.4
4.23 Flow In (spm)
MWD Summary
Total Charges:
11586'
14346'
2760'
Current Depth:
24 Hour Progress:
Drilling AheadRig Activity:
Doyon 15
Daily Charges:$3,410.00
11.1
Alkal Lime
$70,140.00 Report For:
Ratio cP
Ross/Wimmer/Buchanan
Flow In (gpm)
TuffGvlCoal
68.0
Weight
Size
Hycalog SKH616M-E1D PDC
160'
3719'
11446'
Lithology (%)
(current)
ShClyst
Footage
Eni Petroleum
SI13-FN4
Spy Island
24 hr Max
North Slope
564.0
Customer:
Well:
Avg
0.902
1549
8.75"
PVOil / Water
11453'
WOB
20
27-Nov-2012
24:00:00Time:
Report #:
Date:
AK-AM-0009957275
9.40 65/35 18
Ss
3.2
Lst
EVAMAR
Make
9.40
4
Cht Silt Siltst
100
HYDRIL
YP Cor Solids
(lb/100ft2)
3.252.50
Mud (lb/bbl)ml/30min
11473' FazePro
Depth Mud Type
Depth
14346'to11586' 11.7310.9511.42
Avg Min MaxECD
(ppg)
Tools
Xceed 675, EcoScope 675, TeleScope 675, sonicVision 675
API FL
* 10000 units = 100% Gas In Air
Logging Engineers:Emil Opitz / A. Paul Kalenuik
(max)(current)
C-5i
907-685-0772Unit Phone:
104
Emil OpitzReport By:
C-1
195Maximum425
27
Depth C-2 C-3
1698Minimum
Average 5131620131
363
353313229'
1133
Units*
36
12526'
calcareously cemented sandstone and siltstone cuttings.
Drill ahead in production section. Cuttings primarily consist of unconsolidated sands, with lesser amounts of
388
md
120951 849
Gas Summary
C-5n
2541
C-4i C-4n
249 184 90
53
164
566
Trip -
24 hr Recap:
38Background -Connection(max)
Chromatograph (ppm)
.
.
Density (ppg) Viscosity
out (sec/qt)
ECD
(ppg)
Tools
Xceed 675, EcoScope 675, TeleScope 675, sonicVision 675
API FL
Depth
16775'to14346' 12.0511.2711.78
Avg Min Max
16681' FazePro
Depth Mud Type
YP Cor Solids
(lb/100ft2)
3.122.40
Mud (lb/bbl)ml/30min
4
Cht Silt Siltst
100
HYDRIL
Ss
4.2
Lst
EVAMAR
Make
9.40 9.45 66/34 15
11453'
WOB
21
28-Nov-2012
24:00:00Time:
Report #:
Date:
AK-AM-0009957275
Customer:
Well:
Avg
0.902
1547
8.75"
PVOil / Water
Footage
Eni Petroleum
SI13-FN4
Spy Island
24 hr Max
North Slope
543.0
Lithology (%)
(current)
ShClyst
68.0
Weight
Size
Hycalog SKH616M-E1D PDC
160'
3719'
11446'
TuffGvlCoal
$3,410.00
11.6
Alkal Lime
$73,550.00 Report For:
Ratio cP
Ross/Wimmer/Buchanan
Flow In (gpm)
Total Charges:
14346'
16775'
2429'
Current Depth:
24 Hour Progress:
Drilling AheadRig Activity:
Doyon 15
Daily Charges:
Current Pump & Flow Data: Max @ ft Current
16682'285.3
4.23 Flow In (spm)
MWD Summary
Bit Type TFA
Cly
RPM Hours Depth in / out
%
Casing
Summary
Condition
in
Mud Data
@
Yesterday's Depth:
264.0
Rig:
Job No.:
ROP (ft/hr)
Area:
Location:
96%
533
126
SPP (psi)
Gallons/stroke
3465
ROP
Set AtSize
178.9 X-65
Bit #
L-80
Grade
L-80
40.0
20"
13 3/8"
9 5/8"
BTC
* 10000 units = 100% Gas In Air
-Connection(max)
Chromatograph (ppm)
-
24 hr Recap:
98Background Trip
557
285 199 113
69
187
C-4i C-4n C-5n
4063
155342 901
Gas Summary
md
calcareously cemented sandstone and siltstone cuttings.
Drill ahead in production section. Cuttings primarily consist of unconsolidated sands, with lesser amounts of
544
Units*
49
14693'1502
16437'
150
368
4941Minimum
Average 6648573
31
Depth C-2 C-3
2278
C-1
217Maximum434
907-685-0772Unit Phone:
121
Emil OpitzReport By:Logging Engineers:Emil Opitz / A. Paul Kalenuik
(max)(current)
C-5i
.
.
Density (ppg) Viscosity
out (sec/qt)
ECD
(ppg)
Tools
Xceed 675, EcoScope 675, TeleScope 675, sonicVision 675
API FL
Depth
19575'to16775' 12.6711.0512.25
Avg Min Max
19203' FazePro
Depth Mud Type
YP Cor Solids
(lb/100ft2)
2.992.30
Mud (lb/bbl)ml/30min
4
10
Cht Silt Siltst
90
HYDRIL
Ss
4.0
Lst
EVAMAR
Make
9.40 9.45 68/32 16
11453'
WOB
22
29-Nov-2012
24:00:00Time:
Report #:
Date:
AK-AM-0009957275
Customer:
Well:
Avg
0.902
1449
8.75"
PVOil / Water
Footage
Eni Petroleum
SI13-FN4
Spy Island
24 hr Max
North Slope
533.0
Lithology (%)
(current)
ShClyst
68.0
Weight
Size
Hycalog SKH616M-E1D PDC
160'
3719'
11446'
TuffGvlCoal
$3,710.00
8.9
Alkal Lime
$77,260.00 Report For:
Ratio cP
Ross/Wimmer/Buchanan
Flow In (gpm)
Total Charges:
16775'
19575'
2800'
Current Depth:
24 Hour Progress:
Drilling AheadRig Activity:
Doyon 15
Daily Charges:
Current Pump & Flow Data: Max @ ft Current
17615'290.8
4.23 Flow In (spm)
MWD Summary
Bit Type TFA
Cly
RPM Hours Depth in / out
%
Casing
Summary
Condition
in
Mud Data
@
Yesterday's Depth:
298.0
Rig:
Job No.:
ROP (ft/hr)
Area:
Location:
96%
527
125
SPP (psi)
Gallons/stroke
3788
ROP
Set AtSize
178.9 X-65
Bit #
L-80
Grade
L-80
40.0
20"
13 3/8"
9 5/8"
BTC
* 10000 units = 100% Gas In Air
-Connection(max)
Chromatograph (ppm)
-
24 hr Recap:
129Background Trip
562
421 303 156
110
265
C-4i C-4n C-5n
5392
145297 894
Gas Summary
md
calcareously cemented sandstone and siltstone cuttings.
Drill ahead in production section. Cuttings primarily consist of unconsolidated sands, with lesser amounts of
657
Units*
73
16904'1403
18816'
226
369
8172Minimum
Average 8656819
58
Depth C-2 C-3
3865
C-1
210Maximum415
907-685-0772Unit Phone:
111
Emil OpitzReport By:Logging Engineers:Emil Opitz / A. Paul Kalenuik
(max)(current)
C-5i
.
.
Density (ppg) Viscosity
out (sec/qt)
20"
13 3/8"
9 5/8"
BTC
L-80
Grade
L-80
40.0
ROP
Set AtSize
178.9 X-65
Bit #
Area:
Location:
96%
546
129
SPP (psi)
Gallons/stroke
4030
@
Yesterday's Depth:
Rig:
Job No.:
ROP (ft/hr)
Condition
in
Mud Data
Depth in / out
%
Casing
Summary
RPM HoursBit Type TFA
Cly
Current Pump & Flow Data: Max @ ft Current
19767'228.9
4.23 Flow In (spm)
MWD Summary
Total Charges:
19575'
20974'
1399'
Current Depth:
24 Hour Progress:
BROOHRig Activity:
Doyon 15
Daily Charges:$3,410.00
9.0
Alkal Lime
$80,670.00 Report For:
Ratio cP
Ross/Wimmer/Buchanan
Flow In (gpm)
TuffGvlCoal
68.0
Weight
Size
Hycalog SKH616M-E1D PDC
160'
3719'
11446'
Lithology (%)
(current)
ShClyst
Footage
Eni Petroleum
SI13-FN4
Spy Island
24 hr Max
North Slope
459.9
Customer:
Well:
Avg
0.902
1651
8.75"
PVOil / Water
11453'
WOB
23
30-Nov-2012
24:00:00Time:
Report #:
Date:
AK-AM-0009957275
9.60 67/33 17
Ss
4.4
Lst
EVAMAR
Make
9.50
4
Cht Silt Siltst
100
HYDRIL
YP Cor Solids
(lb/100ft2)
3.252.50
Mud (lb/bbl)ml/30min
20974' FazePro
Depth Mud Type
Depth
20974'to19575' 12.6611.1012.47
Avg Min MaxECD
(ppg)
Tools
Xceed 675, EcoScope 675, TeleScope 675, sonicVision 675
API FL
* 10000 units = 100% Gas In Air
Logging Engineers:Emil Opitz / A. Paul Kalenuik
(max)(current)
C-5i
907-685-0772Unit Phone:
131
Emil OpitzReport By:
C-1
246Maximum444
62
Depth C-2 C-3
6470Minimum
Average 6736948150
391
696220351'
1172
Units*
85
19707'
primarily consist of unconsolidated sands, with lesser amounts of calcareously cemented sandstone and siltstone cuttings.
Drill ahead in production section to TD of 20974' MD. CBU. Monitor well for 30min. BROOH per K&M. Cuttings
479
md
122833 870
Gas Summary
C-5n
5081
C-4i C-4n
274 188 118
94
181
560
Trip 144
24 hr Recap:
32Background -Connection(max)
Chromatograph (ppm)
.
.
Density (ppg) Viscosity
out (sec/qt)
ECD
(ppg)
Tools
Xceed 675, EcoScope 675, TeleScope 675, sonicVision 675
API FL
Depth
20974'to20974'
Avg Min Max
20974' FazePro
Depth Mud Type
YP Cor Solids
(lb/100ft2)
3.322.55
Mud (lb/bbl)ml/30min
4
Cht Silt Siltst
HYDRIL
Ss
4.5
Lst
EVAMAR
Make
9.40 68/32 14
11453'
WOB
24
1-Dec-2012
24:00:00Time:
Report #:
Date:
AK-AM-0009957275
Customer:
Well:
Avg
0.902
1548
8.75"
PVOil / Water
Footage
Eni Petroleum
SI13-FN4
Spy Island
24 hr Max
North Slope
Lithology (%)
(current)
ShClyst
68.0
Weight
Size
Hycalog SKH616M-E1D PDC
160'
3719'
11446'
TuffGvlCoal
$3,410.00
8.5
Alkal Lime
$84,080.00 Report For:
Ratio cP
Ross/Wimmer/Buchanan
Flow In (gpm)
Total Charges:
20974'
20974'
0'
Current Depth:
24 Hour Progress:
BROOHRig Activity:
Doyon 15
Daily Charges:
Current Pump & Flow Data: Max @ ft Current
4.23 Flow In (spm)
MWD Summary
Bit Type TFA
Cly
RPM Hours Depth in / out
%
Casing
Summary
Condition
in
Mud Data
@
Yesterday's Depth:
Rig:
Job No.:
ROP (ft/hr)
Area:
Location:
96%
501
118
SPP (psi)
Gallons/stroke
2748
ROP
Set AtSize
178.9 X-65
Bit #
L-80
Grade
L-80
40.0
20"
13 3/8"
9 5/8"
BTC
* 10000 units = 100% Gas In Air
-Connection(max)
Chromatograph (ppm)
144
24 hr Recap:
-Background Trip
0
0 0 0
0
0
C-4i C-4n C-5n
00
00
Gas Summary
md
Power was lost temporarily to the mudlogging unit early in the morning; ~2am. Resulted in loss of data and monitoring
capabilities until restored a short while later.
Continue to BROOH per K&M.
Units*
0
0
00Minimum
Average 00
0
Depth C-2 C-3
0
C-1
0Maximum0
907-685-0772Unit Phone:
0
Emil OpitzReport By:Logging Engineers:Emil Opitz / A. Paul Kalenuik
(max)(current)
C-5i
.
.
Density (ppg) Viscosity
out (sec/qt)
20"
13 3/8"
9 5/8"
BTC
L-80
Grade
L-80
40.0
ROP
Set AtSize
178.9 X-65
Bit #
Area:
Location:
96%
SPP (psi)
Gallons/stroke @
Yesterday's Depth:
Rig:
Job No.:
ROP (ft/hr)
Condition
in
Mud Data
Depth in / out
%
Casing
Summary
RPM HoursBit Type TFA
Cly
Current Pump & Flow Data: Max @ ft Current
4.23 Flow In (spm)
MWD Summary
Total Charges:
20974'
20974'
0'
Current Depth:
24 Hour Progress:
RIH to spot breakerRig Activity:
Doyon 15
Daily Charges:$3,110.00
8.6
Alkal Lime
$87,190.00 Report For:
Ratio cP
Ross/Wimmer/Buchanan
Flow In (gpm)
TuffGvlCoal
68.0
Weight
Size
Hycalog SKH616M-E1D PDC
160'
3719'
11446'
Lithology (%)
(current)
ShClyst
Footage
Eni Petroleum
SI13-FN4
Spy Island
24 hr Max
North Slope
Customer:
Well:
Avg
0.902
1448
8.75" 9521'
PVOil / Water
11453' 20974'
WOB
25
2-Dec-2012
24:00:00Time:
Report #:
Date:
AK-AM-0009957275
54.30
68/32 11
Ss
5.0
Lst
EVAMAR
Make
9.40
140.04
Cht Silt Siltst
HYDRIL
YP
1-1-CT-S-X-I-NO-TD
Cor Solids
(lb/100ft2)
3.122.40
Mud (lb/bbl)ml/30min
20974' FazePro
Depth Mud Type
Depth
20974'to20974'
Avg Min MaxECD
(ppg)
Tools
API FL
12.0
* 10000 units = 100% Gas In Air
Logging Engineers:Emil Opitz / A. Paul Kalenuik
(max)(current)
C-5i
907-685-0772Unit Phone:
0
Emil OpitzReport By:
C-1
0Maximum0
0
Depth C-2 C-3
0Minimum
Average 000
0
00
Units*
Continue to BROOH per K&M. Circulate at casing shoe. POOH on elevators. L/D BHA #5.
md
00
Gas Summary
C-5n
00
C-4i C-4n
0 0 0
0
0
0
Trip -
24 hr Recap:
-Background -Connection(max)
Chromatograph (ppm)
.
.
Density (ppg) Viscosity
out (sec/qt)
ECD
(ppg)
Tools
API FL
12.0
Depth
20974'to20974'
Avg Min Max
20974' FazePro
Depth Mud Type
YP
1-1-CT-S-X-I-NO-TD
Cor Solids
(lb/100ft2)
3.252.50
Mud (lb/bbl)ml/30min
4
Cht Silt Siltst
HYDRIL
Ss
5.1
Lst
EVAMAR
Make
9.45
140.054.30
68/32 14
11453' 20974'
WOB
26
3-Dec-2012
24:00:00Time:
Report #:
Date:
AK-AM-0009957275
Customer:
Well:
Avg
0.902
1352
8.75" 9521'
PVOil / Water
Footage
Eni Petroleum
SI13-FN4
Spy Island
24 hr Max
North Slope
Lithology (%)
(current)
ShClyst
68.0
Weight
Size
Hycalog SKH616M-E1D PDC
160'
3719'
11446'
TuffGvlCoal
$3,110.00
8.6
Alkal Lime
$90,300.00 Report For:
Ratio cP
Ross/Wimmer/Buchanan
Flow In (gpm)
Total Charges:
20974'
20974'
0'
Current Depth:
24 Hour Progress:
Spot BreakerRig Activity:
Doyon 15
Daily Charges:
Current Pump & Flow Data: Max @ ft Current
4.23 Flow In (spm)
MWD Summary
Bit Type TFA
Cly
RPM Hours Depth in / out
%
Casing
Summary
Condition
in
Mud Data
@
Yesterday's Depth:
Rig:
Job No.:
ROP (ft/hr)
Area:
Location:
96%
102
24
SPP (psi)
Gallons/stroke
398
ROP
Set AtSize
178.9 X-65
Bit #
L-80
Grade
L-80
40.0
20"
13 3/8"
9 5/8"
BTC
* 10000 units = 100% Gas In Air
-Connection(max)
Chromatograph (ppm)
140
24 hr Recap:
8Background Trip
0
0 0 0
0
0
C-4i C-4n C-5n
00
00
Gas Summary
md
M/U BHA #6. RIH to 11350' MD. Slip & Cut. RIH to bottom. Circulate and condition mud. Prep for spotting breaker.
Units*
0
0
00Minimum
Average 00
0
Depth C-2 C-3
0
C-1
0Maximum0
907-685-0772Unit Phone:
0
Emil OpitzReport By:Logging Engineers:Emil Opitz / A. Paul Kalenuik
(max)(current)
C-5i
.
.
Density (ppg) Viscosity
out (sec/qt)
20"
13 3/8"
9 5/8"
BTC
L-80
Grade
L-80
40.0
ROP
Set AtSize
178.9 X-65
Bit #
Area:
Location:
96%
211
50
SPP (psi)
Gallons/stroke
429
@
Yesterday's Depth:
Rig:
Job No.:
ROP (ft/hr)
Condition
in
Mud Data
Depth in / out
%
Casing
Summary
RPM HoursBit Type TFA
Cly
Current Pump & Flow Data: Max @ ft Current
4.23 Flow In (spm)
MWD Summary
Total Charges:
20974'
20974'
0'
Current Depth:
24 Hour Progress:
Displace to BrineRig Activity:
Doyon 15
Daily Charges:$3,110.00
8.6
Alkal Lime
$93,410.00 Report For:
Ratio cP
Keener/Wimmer/Buchanan
Flow In (gpm)
TuffGvlCoal
68.0
Weight
Size
160'
3719'
11446'
Lithology (%)
(current)
ShClyst
Footage
Eni Petroleum
SI13-FN4
Spy Island
24 hr Max
North Slope
Customer:
Well:
Avg
1352
PVOil / Water
WOB
27
4-Dec-2012
24:00:00Time:
Report #:
Date:
AK-AM-0009957275
68/32 14
Ss
5.4
Lst
EVAMAR
Make
9.45
Cht Silt Siltst
HYDRIL
YP Cor Solids
(lb/100ft2)
3.122.40
Mud (lb/bbl)ml/30min
20974' FazePro
Depth Mud Type
Depth
20974'to20974'
Avg Min MaxECD
(ppg)
Tools
API FL
* 10000 units = 100% Gas In Air
Logging Engineers:Emil Opitz / A. Paul Kalenuik
(max)(current)
C-5i
907-685-0772Unit Phone:
0
Emil OpitzReport By:
C-1
0Maximum0
0
Depth C-2 C-3
0Minimum
Average 000
0
00
Units*
Spot breaker fluid. POOH per K&M.
md
00
Gas Summary
C-5n
00
C-4i C-4n
0 0 0
0
0
0
Trip 20
24 hr Recap:
14Background -Connection(max)
Chromatograph (ppm)
.
.
Density (ppg) Viscosity
out (sec/qt)
ECD
(ppg)
Tools
API FL
Depth
20974'to20974'
Avg Min Max
20974' Brine
Depth Mud Type
YP Cor Solids
(lb/100ft2)Mud (lb/bbl)ml/30min
Cht Silt Siltst
HYDRIL
Ss Lst
EVAMAR
Make
9.15
WOB
28
5-Dec-2012
24:00:00Time:
Report #:
Date:
AK-AM-0009957275
Customer:
Well:
Avg
27
PVOil / Water
Footage
Eni Petroleum
SI13-FN4
Spy Island
24 hr Max
North Slope
Lithology (%)
(current)
ShClyst
68.0
Weight
Size
160'
3719'
11446'
TuffGvlCoal
$3,110.00
Alkal Lime
$96,520.00 Report For:
Ratio cP
Keener/Wimmer/Buchanan
Flow In (gpm)
Total Charges:
20974'
20974'
0'
Current Depth:
24 Hour Progress:
RIH 4.5" linerRig Activity:
Doyon 15
Daily Charges:
Current Pump & Flow Data: Max @ ft Current
4.23 Flow In (spm)
MWD Summary
Bit Type TFA
Cly
RPM Hours Depth in / out
%
Casing
Summary
Condition
in
Mud Data
@
Yesterday's Depth:
Rig:
Job No.:
ROP (ft/hr)
Area:
Location:
96%
SPP (psi)
Gallons/stroke
ROP
Set AtSize
178.9 X-65
Bit #
L-80
Grade
L-80
40.0
20"
13 3/8"
9 5/8"
BTC
* 10000 units = 100% Gas In Air
-Connection(max)
Chromatograph (ppm)
-
24 hr Recap:
-Background Trip
0
0 0 0
0
0
C-4i C-4n C-5n
00
00
Gas Summary
md
At intermediate casing shoe, displace OBM to Brine. POOH and L/D BHA #6. R/U and begin to RIH w/ 4.5" liner.
Units*
0
0
00Minimum
Average 00
0
Depth C-2 C-3
0
C-1
0Maximum0
907-685-0772Unit Phone:
0
Emil OpitzReport By:Logging Engineers:Emil Opitz / Kori Jo Plowman
(max)(current)
C-5i
.
.
Density (ppg) Viscosity
out (sec/qt)
20"
13 3/8"
9 5/8"
BTC
L-80
Grade
L-80
40.0
ROP
Set AtSize
178.9 X-65
Bit #
Area:
Location:
96%
SPP (psi)
Gallons/stroke @
Yesterday's Depth:
Rig:
Job No.:
ROP (ft/hr)
Condition
in
Mud Data
Depth in / out
%
Casing
Summary
RPM HoursBit Type TFA
Cly
Current Pump & Flow Data: Max @ ft Current
4.23 Flow In (spm)
MWD Summary
Total Charges:
20974'
20974'
0'
Current Depth:
24 Hour Progress:
POOHRig Activity:
Doyon 15
Daily Charges:$3,110.00
Alkal Lime
$99,630.00 Report For:
Ratio cP
Keener/Wimmer/Buchanan
Flow In (gpm)
TuffGvlCoal
68.0
Weight
Size
160'
3719'
11446'
Lithology (%)
(current)
ShClyst
Footage
Eni Petroleum
SI13-FN4
Spy Island
24 hr Max
North Slope
Customer:
Well:
Avg
27
PVOil / Water
WOB
29
6-Dec-2012
24:00:00Time:
Report #:
Date:
AK-AM-0009957275
Ss Lst
EVAMAR
Make
9.15
Cht Silt Siltst
HYDRIL
YP Cor Solids
(lb/100ft2)Mud (lb/bbl)ml/30min
20974' Brine
Depth Mud Type
Depth
20974'to20974'
Avg Min MaxECD
(ppg)
Tools
API FL
* 10000 units = 100% Gas In Air
Logging Engineers:Emil Opitz / Kori Jo Plowman
(max)(current)
C-5i
907-685-0772Unit Phone:
0
Emil OpitzReport By:
C-1
0Maximum0
0
Depth C-2 C-3
0Minimum
Average 000
0
00
Units*
RIH w/ 4.5" liner to 17776' MD. POOH due to incorrect liner configuration. At depth of 11300' MD as of 0330.
md
00
Gas Summary
C-5n
00
C-4i C-4n
0 0 0
0
0
0
Trip -
24 hr Recap:
-Background -Connection(max)
Chromatograph (ppm)
.
.
Density (ppg) Viscosity
out (sec/qt)
ECD
(ppg)
Tools
API FL
Depth
20974'to20974'
Avg Min Max
20974' Brine
Depth Mud Type
YP Cor Solids
(lb/100ft2)Mud (lb/bbl)ml/30min
Cht Silt Siltst
HYDRIL
Ss Lst
EVAMAR
Make
9.15
WOB
30
7-Dec-2012
24:00:00Time:
Report #:
Date:
AK-AM-0009957275
Customer:
Well:
Avg
27
PVOil / Water
Footage
Eni Petroleum
SI13-FN4
Spy Island
24 hr Max
North Slope
Lithology (%)
(current)
ShClyst
68.0
Weight
Size
160'
3719'
11446'
TuffGvlCoal
$7,536.00
Alkal Lime
$107,166.00 Report For:
Ratio cP
Keener/Wimmer/Buchanan
Flow In (gpm)
Total Charges:
20974'
20974'
0'
Current Depth:
24 Hour Progress:
RIH w/ 4.5" linerRig Activity:
Doyon 15
Daily Charges:
Current Pump & Flow Data: Max @ ft Current
4.23 Flow In (spm)
MWD Summary
Bit Type TFA
Cly
RPM Hours Depth in / out
%
Casing
Summary
Condition
in
Mud Data
@
Yesterday's Depth:
Rig:
Job No.:
ROP (ft/hr)
Area:
Location:
96%
SPP (psi)
Gallons/stroke
ROP
Set AtSize
178.9 X-65
Bit #
L-80
Grade
L-80
40.0
20"
13 3/8"
9 5/8"
BTC
* 10000 units = 100% Gas In Air
-Connection(max)
Chromatograph (ppm)
-
24 hr Recap:
-Background Trip
0
0 0 0
0
0
C-4i C-4n C-5n
00
00
Gas Summary
md
NOTE: Daily cost includes engineer changeout on 12/4 and consumables from this well.
L/D liner. Open ICDs. Re-run in hole with liner.
Units*
0
0
00Minimum
Average 00
0
Depth C-2 C-3
0
C-1
0Maximum0
907-685-0772Unit Phone:
0
Emil OpitzReport By:Logging Engineers:Emil Opitz / Kori Jo Plowman
(max)(current)
C-5i
.
.
Density (ppg) Viscosity
out (sec/qt)
20"
13 3/8"
9 5/8"
BTC
L-80
Grade
L-80
40.0
ROP
Set AtSize
178.9 X-65
Bit #
Area:
Location:
96%
SPP (psi)
Gallons/stroke @
Yesterday's Depth:
Rig:
Job No.:
ROP (ft/hr)
Condition
in
Mud Data
Depth in / out
%
Casing
Summary
RPM HoursBit Type TFA
Cly
Current Pump & Flow Data: Max @ ft Current
4.23 Flow In (spm)
MWD Summary
Total Charges:
20974'
20974'
0'
Current Depth:
24 Hour Progress:
RIH w/ 4.5" linerRig Activity:
Doyon 15
Daily Charges:$2,810.00
Alkal Lime
$109,976.00 Report For:
Ratio cP
Keener/Wimmer/Buchanan
Flow In (gpm)
TuffGvlCoal
68.0
Weight
Size
160'
3719'
11446'
Lithology (%)
(current)
ShClyst
Footage
Eni Petroleum
SI13-FN4
Spy Island
24 hr Max
North Slope
Customer:
Well:
Avg
27
PVOil / Water
WOB
31
8-Dec-2012
24:00:00Time:
Report #:
Date:
AK-AM-0009957275
Ss Lst
EVAMAR
Make
9.15
Cht Silt Siltst
HYDRIL
YP Cor Solids
(lb/100ft2)Mud (lb/bbl)ml/30min
20974' Brine
Depth Mud Type
Depth
20974'to20974'
Avg Min MaxECD
(ppg)
Tools
API FL
* 10000 units = 100% Gas In Air
Logging Engineers:Emil Opitz / Kori Jo Plowman
(max)(current)
C-5i
907-685-0772Unit Phone:
0
Emil OpitzReport By:
C-1
0Maximum0
0
Depth C-2 C-3
0Minimum
Average 000
0
00
Units*
Continue to RIH with 4.5" liner per K&M.
md
00
Gas Summary
C-5n
00
C-4i C-4n
0 0 0
0
0
0
Trip -
24 hr Recap:
-Background -Connection(max)
Chromatograph (ppm)
.
.
Density (ppg) Viscosity
out (sec/qt)
ECD
(ppg)
Tools
API FL
Depth
20974'to20974'
Avg Min Max
20974' Brine
Depth Mud Type
YP Cor Solids
(lb/100ft2)Mud (lb/bbl)ml/30min
Cht Silt Siltst
HYDRIL
Ss Lst
EVAMAR
Make
9.15
WOB
32
9-Dec-2012
24:00:00Time:
Report #:
Date:
AK-AM-0009957275
Customer:
Well:
Avg
27
PVOil / Water
Footage
Eni Petroleum
SI13-FN4
Spy Island
24 hr Max
North Slope
Lithology (%)
(current)
ShClyst
68.0
Weight
Size
160'
3719'
11446'
TuffGvlCoal
$2,810.00
Alkal Lime
$112,786.00 Report For:
Ratio cP
Keener/Wimmer/Buchanan
Flow In (gpm)
Total Charges:
20974'
20974'
0'
Current Depth:
24 Hour Progress:
Test BOPsRig Activity:
Doyon 15
Daily Charges:
Current Pump & Flow Data: Max @ ft Current
4.23 Flow In (spm)
MWD Summary
Bit Type TFA
Cly
RPM Hours Depth in / out
%
Casing
Summary
Condition
in
Mud Data
@
Yesterday's Depth:
Rig:
Job No.:
ROP (ft/hr)
Area:
Location:
96%
SPP (psi)
Gallons/stroke
ROP
Set AtSize
178.9 X-65
Bit #
L-80
Grade
L-80
40.0
20"
13 3/8"
9 5/8"
BTC
* 10000 units = 100% Gas In Air
-Connection(max)
Chromatograph (ppm)
-
24 hr Recap:
-Background Trip
0
0 0 0
0
0
C-4i C-4n C-5n
00
00
Gas Summary
md
Finish running liner. POOH and rack back 25 stands. L/D 5" DP. Begin testing BOPs.
Units*
0
0
00Minimum
Average 00
0
Depth C-2 C-3
0
C-1
0Maximum0
907-685-0772Unit Phone:
0
Emil OpitzReport By:Logging Engineers:Emil Opitz / Kori Jo Plowman
(max)(current)
C-5i
W
E
L
L
N
A
M
E
:
SI
1
3
-
F
N
4
LO
C
A
T
I
O
N
:
Spy Island
OP
E
R
A
T
O
R
:
EN
I
P
e
t
r
o
l
e
u
m
AREA:North Slope
MU
D
C
O
:
MI
S
w
a
c
o
STATE:Alaska
RI
G
:
Do
y
o
n
1
5
SPUD:9-Nov-12
SP
E
R
R
Y
J
O
B
:
AK
-
A
M
-
0
0
0
9
9
5
7
2
7
5
TD:30-Nov-12
BI
T
RE
C
O
R
D
MW
D
BH
A
#
SD
L
RU
N
#
Bi
t
#
B
i
t
T
y
p
e
B
i
t
Si
z
e
De
p
t
h
In
(
f
t
)
De
p
t
h
Ou
t
(
f
t
)
Fo
o
t
a
g
e
B
i
t
Ho
u
r
s
TF
A
A
V
G
RO
P
WO
B
(m
a
x
)
RP
M
(m
a
x
)
SP
P
(m
a
x
)
FL
O
W
G
P
M
(m
a
x
)
Bi
t
G
r
a
d
e
R
e
m
a
r
k
s
2
1
0
0
1
H
u
g
h
e
s
M
X
-
1
M
il
l
t
o
o
t
h
1
6
"
1
6
0
3
73
5
3
5
7
5
2
2
.
4
0
1
.
1
1
7
1
5
9
.
4
25
40
2
1
0
0
8
5
0
0-
0
-
N
O
-
A
-
E
-
I
-
N
O
-
T
D
Surface TD
3
2
0
0
2
S
m
i
t
h
M
D
S
i
7
1
6
L
H
EB
P
X
P
D
C
1
2
.
2
5
"
3
7
3
5
9
4
9
3
5
7
5
8
4
3
.
7
0
1
.
1
6
7
1
3
1
.
8
10
18
0
2
1
0
0
9
0
0
3-
4
-
C
T
-
A
-
X
-
I
-
B
T
-
D
T
F
MWD Exceed tool failure
4
3
0
0
3
H
y
c
a
l
o
g
S
K
H
I
7
1
6
D
-
E
4
C
P
D
C
1
2
.
2
5
"
9
4
9
3
1
1
4
5
3
1
9
6
0
6
.
5
0
0
.
9
6
9
3
0
2
.
0
10
20
0
2
7
5
0
9
0
0
1
-
1
-
N
O
-
A
-
X
-
N
O
-
T
D
I
n
t
e
r
m
e
d
i
a
t
e
T
D
5
4
0
0
4
H
y
c
a
l
o
g
S
K
H
6
1
6
M
-
E
1
D
P
D
C
8
.
7
5
1
1
4
5
3
2
0
9
7
4
9
5
2
1
5
4
.
3
0
0
.
9
0
2
1
7
5
.
3
12
14
0
3
7
0
0
5
2
5
1
-
1
-
C
T
-
S
-
X
-
I
-
N
O
-
T
D
P
r
o
d
u
c
t
i
o
n
T
D
WE
L
L
N
A
M
E
:
L
O
C
A
T
I
O
N
:
OP
E
R
A
T
O
R
:
A
R
E
A
:
MU
D
C
O
:
S
T
A
T
E
:
RI
G
:
S
P
U
D
:
SP
E
R
R
Y
J
O
B
:
T
D
:
Mu
d
R
e
c
o
r
d
W
a
t
e
r
B
a
s
e
d
M
u
d
R
e
c
o
r
d
MI
S
p
u
d
M
u
d
S
u
r
f
a
c
e
S
e
c
t
i
o
n
1
6
0
'
t
o
3
7
3
5
'
LS
N
D
I
n
t
e
r
m
e
d
i
a
t
e
S
e
c
t
i
o
n
3
7
3
5
'
t
o
1
1
4
5
3
'
Da
t
e
D
e
p
t
h
W
t
V
i
s
P
V
Y
P
G
e
l
s
F
i
l
t
R6
0
0
/
R
3
0
0
/
R
2
0
0
/
R
1
0
0
/
R6
/
R
3
Ca
k
e
S
o
l
i
d
s
Oi
l
/
W
a
t
e
r
Sd
P
m
p
H
M
B
T
P
f
/
M
f
C
h
l
o
r
H
a
r
d
R
e
m
a
r
k
s
ft
-
M
D
p
p
g
s
e
c
l
b
/
1
0
0
l
b
/
1
0
0
f
t
2
m
/
3
0
m
R
h
e
o
m
e
t
e
r
3
2
n
d
s
%
v
o
l
%
v
o
l
m
g
/
l
C
a
+
+
10
-
N
o
v
3
1
3
9
.
0
0
1
1
3
3
1
3
7
1
9
/
3
6
/
4
4
5
.
7
9
9
/
6
8
/
5
7
/
4
2
/
1
9
/
1
7
3
/
-
2
.
2
.
5
/
9
7
.
3
0
.
0
0
0
.
0
9
9
.
8
2
2
.
0
.
0
2
/
.
1
7
1
6
0
0
6
0
Spudded @ 1515hrs. Drilling ahead
11
-
N
o
v
1
5
2
5
9
.
1
0
1
2
1
2
7
4
1
2
1
/
4
1
/
4
8
5
.
0
9
5
/
6
8
/
5
8
/
4
5
/
2
1
/
2
0
3
/
-
4
.
3
.
5
/
9
5
.
2
0
.
1
5
0
.
0
9
1
0
.
0
2
3
.
0
.
0
3
/
.
1
9
1
8
0
0
8
0
Drilling ahead, TD Surface Section
12
-
N
o
v
3
7
3
5
9
.
4
0
7
8
2
7
3
0
1
5
/
3
4
/
4
1
5
.
6
8
4
/
57
/
4
8
/
3
4
/
1
5
/
1
4
2
/
-
6
.
0
.
5
/
9
3
.
5
0
.
2
0
0
.
0
2
9
.
4
24
.
0
.
0
1
/
.
1
4
8
0
0
4
0
B
R
O
O
H
,
L
/
D
B
H
A
#
2
13
-
N
o
v
3
7
3
5
9
.
3
0
4
6
1
5
1
6
4
/
1
0
/
1
2
5
.
4
4
6
/
31
/
2
4
/
1
6
/
4
/
4
1
/
-
5
.
8
1
/
9
4
0
.
1
0
0.
0
1
8
.
5
2
2
.
5
.
0
0
/
.
0
4
8
0
0
4
0
R
/
D
C
a
s
i
n
g
E
q
u
i
p
m
e
n
t
14
-
N
o
v
3
7
3
5
9
.
3
0
4
5
1
5
1
5
4
/
1
0
/
1
2
5
.
4
4
5
/
3
0
/
2
3
/
1
5
/
4
/
4
1
/
-
5
.
8
1
/
9
4
0.
1
0
0
.
0
1
8
.
0
2
2
.
5
.
0
0
/
.
0
3
8
0
0
4
0
T
e
s
t
B
O
P
E
15
-
N
o
v
3
8
2
5
9
.
2
0
5
0
1
0
2
0
9
/
1
1
/
1
2
7.
0
4
0
/
3
0
/
2
7
/
2
2
/
1
0
/
8
1
/
-
4
.
0
2
/
9
4
-
0
.
1
0
9
.
5
-
.
0
5
/
.
6
5
9
0
0
4
0
D
r
illing A head
16
-
N
o
v
6
3
3
7
9
.
2
5
5
6
1
4
2
7
1
4
/
2
3
/
2
9
5
.
0
5
5
/
4
1
/
3
5
/
2
8
/
1
4
/
1
2
1
/
-
5
.
0
3
/
9
2
0
.
1
0
0
.
1
0
9
.
8
1
5
.
0
.
0
5
/
.
5
0
1
2
0
0
4
0
D
r
illing A head
17
-
N
o
v
8
6
6
0
9
.
3
5
5
1
1
2
2
8
1
3
/
3
0
/
4
0
5
.
4
5
2
/
4
0
/
3
3
/
2
6
/
1
3
/
1
2
1
/
-
5
.
5
3
/
9
2
0
.
1
0
0
.
0
8
9
.
7
1
8
.
8
.
0
5
/
.
4
5
1
7
0
0
4
0
D
r
illing A head
18
-
N
o
v
9
4
9
3
9
.
4
0
5
2
1
5
2
3
1
3
/
2
6
/
3
4
5
.
4
5
3
/
3
8
/
3
2
/
2
7
/
1
3
/
1
2
1
/
-
6
.
0
3/
9
1
0
.
1
0
0
.
0
5
9
.
7
1
7
.
5
.
0
5
/
.
4
5
1
3
0
0
4
0
B
R
O
O
H
19
-
N
o
v
9
4
9
3
9
.
3
0
4
8
1
4
2
8
1
5
/
2
2
/
2
8
5
.
4
56
/
4
2
/
3
6
/
2
8
/
1
4
/
1
3
1
/
-
6
.
0
3
/
9
1
0.
1
0
0
.
8
0
9
.
7
1
8
.
0
.
0
5
/
2
.
0
0
1
4
0
0
4
0
R
I
H
w
/
B
H
A
#
4
20
-
N
o
v
1
1
4
5
3
9
.
5
0
4
9
1
2
2
5
1
3
/
3
2
/
4
9
5
.
2
4
9
/
3
7
/
3
1
/
2
5
/
1
2
/
1
1
1
/
-
7
.
0
3/
9
0
0
.
1
0
0
.
0
5
9
.
8
2
0
.
0
.
0
5
/
.
5
0
1
4
0
0
4
0
B
R
O
O
H
21
-
N
o
v
1
1
4
5
3
9
.
4
0
4
8
1
2
2
4
1
3
/
2
8
/
4
2
5
.
2
4
8
/
3
6
/
3
0
/
2
4
/
1
2
/
1
1
1
/
-
7
.
0
3
/
90
0
.
1
0
0
.
0
5
9
.
8
1
8
.
0
.
0
5
/
.
5
0
1
4
0
0
4
0
L
/
D
B
H
A
22
-
N
o
v
1
1
4
5
3
9
.
4
0
4
8
1
2
2
4
1
3
/
2
6
/
4
0
5
.
4
4
8
/
3
6
/
31
/
2
4
/
1
3
/
1
2
1
/
-
7
.
0
3
/
9
0
0
.
1
0
0
.
05
9
.
7
1
7
.
5
.
0
5
/
.
4
5
1
4
0
0
4
0
R
I
H
w
/
9
5
/
8
"
c
a
s
i
n
g
23
-
N
o
v
1
1
4
5
3
9
.
4
0
4
2
9
1
3
5
/
8
/
1
1
5
.
6
31
/
2
2
/
1
7
/
1
3
/
6
/
4
1
/
-
6
.
8
3
/
9
0
0
.
00
0
.
0
4
9
.
6
1
5
.
0
.
0
4
/
.
3
0
1
4
0
0
4
0
S
e
t
E
-
s
l
i
p
s
24
-
N
o
v
1
1
4
5
3
9
.
4
0
4
3
9
1
5
6
/
1
0
/
1
4
5
.
6
33
/
2
4
/
1
9
/
1
5
/
7
/
5
1
/
-
7
.
0
3
/
9
0
0
.
00
0
.
0
3
9
.
5
1
7
.
5
.
0
2
/
.
2
5
1
4
0
0
4
0
T
e
s
t
i
n
g
B
O
P
E
25
-
N
o
v
1
1
4
5
3
9
.
4
0
4
3
9
1
6
7
/
1
2
/
1
6
-
-
-
-
-
-
-
-
-
-
-
-
-
Oi
l
B
a
s
e
d
M
u
d
R
e
c
o
r
d
11
4
5
3
'
t
o
2
0
9
7
4
'
Da
t
e
D
e
p
t
h
W
t
V
i
s
P
V
Y
P
G
e
l
s
F
i
l
t
R6
0
0
/
R
3
0
0
/
R
2
0
0
/
R
1
0
0
/
R6
/
R
3
Ca
k
e
C or
r
.
So
l
i
d
Oi
l
/
W
a
t
e
r
Oi
l
P
o
m
L
i
m
e
S
a
l
t
C
l
-
Em
u
l
St
a
b
i
l
i
t
y
S
d
R
e
m
a
r
k
s
ft
-
M
D
p
p
g
s
e
c
l
b
/
1
0
0
l
b
/
1
0
0
f
t
2
m
/
3
0
m
R
h
e
o
m
e
t
e
r
3
2
n
d
s
%
v
o
l
%
v
o
l
l
b
/
b
b
l
%
W
t
m
g
/
L
m
g
/
l
%
v
o
l
26
-
N
o
v
1
1
5
8
6
9
.
4
0
4
6
1
4
1
0
5
/
6
/
7
-
3
7
/
2
4
/
1
8
/
1
6
/
6/
5
-
9
.
9
6
5
/
3
5
5
6
2
.
5
0
3
.
2
5
3
3
.
6
0
9
7
0
0
0
5
1
0
D
r
illing A head
27
-
N
o
v
1
4
3
0
7
9
.
4
0
4
9
1
5
1
8
7
/
7
/
8
3
.
2
4
8
/
3
3
/
2
7
/
1
9
/
8/
7
-
/
2
1
1
.
1
6
5
/
3
5
5
6
2
.
5
0
3
.
2
5
2
9
.
9
8
8
1
0
0
0
6
4
5
0
.
1
0
D
r
illing A head
28
-
N
o
v
1
6
6
8
1
9
.
4
0
4
7
1
5
1
5
6
/
6
/
7
4
.
2
4
5
/
3
0
/
2
5
/
1
7
/
7/
6
-
/
2
1
1
.
6
6
6
/
3
4
5
6
2
.
4
0
3
.
1
2
2
9
.
7
7
7
8
0
0
0
7
2
0
0
.
1
0
D
r
illing A head
29
-
N
o
v
1
9
4
8
0
9
.
4
0
4
9
1
4
1
6
6
/
6
/
7
4
.
0
4
4
/
3
0
/
2
3
/
1
7
/
7/
6
-
/
2
8
.
9
6
8
/
3
2
6
0
2
.
3
0
2
.
9
9
2
9
.
1
7
7
5
0
0
0
6
8
2
0
.
1
0
D
r
illing A head
30
-
N
o
v
2
0
9
7
4
9
.
5
0
5
1
1
6
1
7
6
/
7
/
7
4
.
0
4
9
/
3
3
/
2
6
/
1
8
/
7/
6
-
/
2
9
.
0
6
7
/
3
3
5
9
2
.
5
0
3
.
2
5
2
8
.
5
4
7
4
0
0
0
6
4
5
0
.
1
0
B
R
O
O
H
1-
D
e
c
2
0
9
7
4
9
.
4
0
4
9
1
5
1
4
5
/
6
/
6
4
.
5
4
4
/
2
9
/
2
3
/
1
6
/
6/
5
-
/
2
8
.
5
9
8
/
3
2
6
0
2
.
5
5
3
.
3
2
2
8
.
6
1
7
3
0
0
0
7
5
2
0
.
1
0
B
R
O
O
H
2-
D
e
c
2
0
9
7
4
9
.
4
0
4
8
1
4
1
1
5
/
6
/
6
5
.
0
39
/
2
5
/
1
9
/
1
3
/
6
/
5
-
/
2
8
.
6
6
8
/
3
2
6
1
2.
4
0
3
.
1
2
2
8
.
6
9
7
2
0
0
0
7
0
0
0
.
1
0
R
I
H
t
o
s
p
o
t
b
r
e
a
k
e
r
3-
D
e
c
2
0
9
7
4
9
.
4
5
5
2
1
3
1
4
5
/
6
/
6
5
.
1
40
/
2
7
/
2
0
/
1
4
/
6
/
5
-
/
2
8
.
6
6
8
/
3
2
6
1
2.
5
0
3
.
2
5
2
8
.
6
9
7
2
0
0
0
7
0
0
0
.
1
0
C
i
r
c
u
l
a
t
e
a
n
d
c
o
n
d
i
t
i
o
n
m
u
d
4-
D
e
c
2
0
9
7
4
9
.
4
5
5
2
1
3
1
4
5
/
6
/
6
5
.
4
4
0
/
2
7
/
2
0
/
1
4
/
6/
5
-
/
2
8
.
6
6
8
/
3
2
6
1
2
.
4
0
3
.
1
2
2
8
.
6
9
7
2
0
0
0
6
7
0
0
.
1
0
P
O
O
H
5-
D
e
c
2
0
9
7
4
9
.
1
5
2
7
-
-
-
-
-
-
-
-
-
-
-
-
1
0
4
5
0
0
-
-
3
%
K
C
l
N
a
C
l
B
r
i
n
e
13
3
/
8
"
S
u
r
f
a
c
e
@
3
7
2
0
'
M
D
Ca
s
i
n
g
R
e
c
o
r
d
Pr
o
d
u
c
t
i
o
n
S
e
c
t
i
o
n
Sp
y
I
s
l
a
n
d
No
r
t
h
S
l
o
p
e
Al
a
s
k
a
9-
N
o
v
-
1
2
30
-
N
o
v
-
1
2
20
"
C
o
n
d
u
c
t
o
r
@
1
6
0
'
M
D
SI
1
3
-
F
N
4
EN
I
P
e
t
r
o
l
e
u
m
MI
S
w
a
c
o
Do
y
o
n
1
5
9
5
/
8
"
I
n
t
e
r
m
e
d
i
a
t
e
@
1
1
4
4
6
'
M
D
Fa
z
e
P
r
o
AK
-
A
M
-
0
0
0
9
9
5
7
2
7
5
Well Name: Depth (MD) to ft
Location: (TVD) to ft
Operator:Show Report No.
Show Report Report Prepared By: Formation:
Report Delivered To: Date Drilled:
SI13-FN4
3799
1
3699
Andrew Buchanan
10100 10750
Spy Island
eni Petroleum
Emil Opitz
20-Nov-12
N Sand
Dt h ft C1 C1 C1 C1
Hydrocarbon Ratios
Non-producible Hydrocarbons based upon field chromatograph data.
1300Md C h l i d ( / L )53110202
Interpretation:
GU i t
1
Depth ft C1 C1 C1 C1
Flowline Background Show C2 C3 C4 C5
ppm ppm ppm
Hydrocarbon Ratios
C1 -=C1/C2 =
C2 -=C1/C3 =
C3 -=C1/C4 =
C4 -=C1/C5 =
C5 -=
1300Mud Chlorides (mg/L) =
0 0
0
95
603 23
4976 66329 106
580
0
35 #DIV/0!35
531
98 3
61353
646
1753
10202 Gas Units
1000
NPH
Production
Analysis Gas Oil Water x Non-Producible Hydrocarbons
Depth ft
Flowline Background Show
ppm ppm ppm
Hydrocarbon Ratios
C1 -=C1/C2 =
C2 -=C1/C3 =
1300
103
577
Mud Chlorides (mg/L) =
520
10233
56347
445
23
4976
Gas Units
51371
497
2
10
100
Gas
C3 -=C1/C4 =
C4 -=C1/C5 =
C5 -=
Production
Analysis Gas Oil Water x Non-Producible Hydrocarbons
Depth ft C1 C1 C1 C1
Flowline Background Show C2 C3 C4 C5
ppm ppm ppm
Mud Chlorides (mg/L) =1300
89
17
21
368
3022
21 0
3
17 0
92
10635
2446
Gas Units
Hydrocarbon Ratios3
1
Oil
NPH
pp pp pp
Hydrocarbon Ratios
C1 -=C1/C2 =
C2 -=C1/C3 =
C3 =C1/C4 =
C4 -=C1/C5 =
C5 -=
Production
Analysis Gas Oil Water x Non-Producible Hydrocarbons
291
35479
158450 40
239
220
38300 2821
14
6
172
12414 206
87
285
410
4
225
100
1000
NPH
Depth ft
Flowline Background Show
ppm ppm ppm
Hydrocarbon Ratios
C1 -=C1/C2 =
C2 -=C1/C3 =
C3 -=C1/C4 =
C4 -=C1/C5 =
Mud Chlorides (mg/L) =1300
2821
288 6 282
231
35614
216 14
409 40
10679
202 116
89
14 217
151
162
32793
351
369
Gas Units
4
10
NPH
Oil
Gas
C5 -=
Production
Analysis Gas Oil Water x Non-Producible Hydrocarbons
288 6 282
1
NPH
Well Name: Depth (MD) to ft
Location: (TVD) to ft
Operator:Show Report No.
Show Report Report Prepared By: Formation:
Report Delivered To: Date Drilled:
27-Nov-12
OA Sand
11700 13300
Spy Island
eni Petroleum
Emil Opitz
SI13-FN4
3843
2
3853
Andrew Buchanan
Dt h ft C1 C1 C1 C1
1
11870
Interpretation:
GU i t 900 97000Md C h l i d ( / L )
Hydrocarbon Ratios
Non-producible Hydrocarbons based upon field chromatograph data.
Depth ft C1 C1 C1 C1
Flowline Background Show C2 C3 C4 C5
ppm ppm ppm
Hydrocarbon Ratios
C1 -=C1/C2 =
C2 -=C1/C3 =
C3 -=C1/C4 =
C4 -=C1/C5 =
C5 -=
11870 Gas Units
562519
900
436 11
97741
230
188
140
698
174
529 10
425
719 21
4437 102178
0 174
97000Mud Chlorides (mg/L) =
1000
NPH
Production
Analysis Gas Oil Water x Non-Producible Hydrocarbons
Depth ft
Flowline Background Show
ppm ppm ppm
Hydrocarbon Ratios
C1 -=C1/C2 =
C2 -=C1/C3 =
2
Gas Units
104129
720 820
12232
111456
1013
100
7327
Mud Chlorides (mg/L) =
145
241
97500
10
100
Gas
C3 -=C1/C4 =
C4 -=C1/C5 =
C5 -=
Production
Analysis Gas Oil Water x Non-Producible Hydrocarbons
Depth ft C1 C1 C1 C1
Flowline Background Show C2 C3 C4 C5
ppm ppm ppm
Hydrocarbon Ratios3
Gas Units
358
96
320 171
528
12530
366 75
699432
149
291
1103 Mud Chlorides (mg/L) =97500
1
Oil
NPH
pp pp pp
Hydrocarbon Ratios
C1 -=C1/C2 =
C2 -=C1/C3 =
C3 =C1/C4 =
C4 -=C1/C5 =
C5 -=
Production
Analysis Gas Oil Water x Non-Producible Hydrocarbons
4
388
678
163
272
3155
406328 35
153
363
120951 10536
178
849 171
566
285
425
110415
100
1000
NPH
Depth ft
Flowline Background Show
ppm ppm ppm
Hydrocarbon Ratios
C1 -=C1/C2 =
C2 -=C1/C3 =
C3 -=C1/C4 =
C4 -=C1/C5 =
4
473
Gas Units
272
2938
73441
694
474
155
88 270
25 243 218
547 74
13198
298 143 155
358
79584 6143
Mud Chlorides (mg/L) =87000
10
NPH
Oil
Gas
C5 -=
Production
Analysis Gas Oil Water x Non-Producible Hydrocarbons
298 143 155
1
NPH
Well Name: Depth (MD) to ft
Location: (TVD) to ft
Operator:Show Report No.
Show Report Report Prepared By: Formation:
Report Delivered To: Date Drilled:
28-Nov-12
OA Sand
14400 16100
Spy Island
eni Petroleum
Emil Opitz
SI13-FN4
3856
3
3844
Andrew Buchanan
Dt h ft C1 C1 C1 C1
1
14482
Interpretation:
GU i t 1322 81000Md C h l i d ( / L )
Hydrocarbon Ratios
Non-producible Hydrocarbons based upon field chromatograph data.
Depth ft C1 C1 C1 C1
Flowline Background Show C2 C3 C4 C5
ppm ppm ppm
Hydrocarbon Ratios
C1 -=C1/C2 =
C2 -=C1/C3 =
C3 -=C1/C4 =
C4 -=C1/C5 =
C5 -=
14482 Gas Units
596621
1322
497 34
136595
295
220
179
765
302
712 91
463
794 29
2780 139375
73 229
81000Mud Chlorides (mg/L) =
1000
NPH
Production
Analysis Gas Oil Water x Non-Producible Hydrocarbons
Depth ft
Flowline Background Show
ppm ppm ppm
Hydrocarbon Ratios
C1 -=C1/C2 =
C2 -=C1/C3 =
2
Gas Units
147526
839 901
14688
155342
1463
62
7816
Mud Chlorides (mg/L) =
176
300
82000
10
100
Gas
C3 -=C1/C4 =
C4 -=C1/C5 =
C5 -=
Production
Analysis Gas Oil Water x Non-Producible Hydrocarbons
Depth ft C1 C1 C1 C1
Flowline Background Show C2 C3 C4 C5
ppm ppm ppm
Hydrocarbon Ratios3
Gas Units
474
66
368 165
557
15215
434 123
727491
203
311
1163 Mud Chlorides (mg/L) =82000
1
Oil
NPH
pp pp pp
Hydrocarbon Ratios
C1 -=C1/C2 =
C2 -=C1/C3 =
C3 =C1/C4 =
C4 -=C1/C5 =
C5 -=
Production
Analysis Gas Oil Water x Non-Producible Hydrocarbons
4
342
601
192
214
1889
539252 61
162
313
126866 11620
119
728 127
461
337
376
115246
100
1000
NPH
Depth ft
Flowline Background Show
ppm ppm ppm
Hydrocarbon Ratios
C1 -=C1/C2 =
C2 -=C1/C3 =
C3 -=C1/C4 =
C4 -=C1/C5 =
4
567
Gas Units
285
896
94990
923
540
168
56 333
106 264 158
614 47
16088
306 130 176
389
100452 5462
Mud Chlorides (mg/L) =81000
10
NPH
Oil
Gas
C5 -=
Production
Analysis Gas Oil Water x Non-Producible Hydrocarbons
306 130 176
1
NPH
Well Name: Depth (MD) to ft
Location: (TVD) to ft
Operator:Show Report No.
Show Report Report Prepared By: Formation:
Report Delivered To: Date Drilled:
SI13-FN4
3818
4
3854
Andrew Buchanan
16400 18200
Spy Island
eni Petroleum
Emil Opitz
11/28/2012 - 11/29/2012
OA Sand
Dt h ft C1 C1 C1 C1
Hydrocarbon Ratios
Non-producible Hydrocarbons based upon field chromatograph data.
81000Md C h l i d ( / L )99816509
Interpretation:
GU i t
1
Depth ft C1 C1 C1 C1
Flowline Background Show C2 C3 C4 C5
ppm ppm ppm
Hydrocarbon Ratios
C1 -=C1/C2 =
C2 -=C1/C3 =
C3 -=C1/C4 =
C4 -=C1/C5 =
C5 -=
81000Mud Chlorides (mg/L) =
90 150
108
370
651 31
3001 107521 169
620
240
573 697465
998
407 37
104520
282
225
16509 Gas Units
1000
NPH
Production
Analysis Gas Oil Water x Non-Producible Hydrocarbons
Depth ft
Flowline Background Show
ppm ppm ppm
Hydrocarbon Ratios
C1 -=C1/C2 =
C2 -=C1/C3 =
78000
169
283
Mud Chlorides (mg/L) =
894
16908
145297
1382
78
7609
Gas Units
137688
816
2
10
100
Gas
C3 -=C1/C4 =
C4 -=C1/C5 =
C5 -=
Production
Analysis Gas Oil Water x Non-Producible Hydrocarbons
Depth ft C1 C1 C1 C1
Flowline Background Show C2 C3 C4 C5
ppm ppm ppm
Mud Chlorides (mg/L) =78000
486
194
288
1302
710
415 127
76
369 175
562
17650
478
Gas Units
Hydrocarbon Ratios3
1
Oil
NPH
pp pp pp
Hydrocarbon Ratios
C1 -=C1/C2 =
C2 -=C1/C3 =
C3 =C1/C4 =
C4 -=C1/C5 =
C5 -=
Production
Analysis Gas Oil Water x Non-Producible Hydrocarbons
447
126188
270906 116
591
399
135048 8860
124
177
1026
467276 123
160
270
790
4
467
100
1000
NPH
Depth ft
Flowline Background Show
ppm ppm ppm
Hydrocarbon Ratios
C1 -=C1/C2 =
C2 -=C1/C3 =
C3 -=C1/C4 =
C4 -=C1/C5 =
Mud Chlorides (mg/L) =77000
9075
428 196 232
539
114529
377 327
801 142
17958
50 455
160
150 389
271
2109
105454
1082
659
Gas Units
4
10
NPH
Oil
Gas
C5 -=
Production
Analysis Gas Oil Water x Non-Producible Hydrocarbons
428 196 232
1
NPH
Well Name: Depth (MD) to ft
Location: (TVD) to ft
Operator:Show Report No.
Show Report Report Prepared By: Formation:
Report Delivered To: Date Drilled:
11/29/2012 - 11/30/2012
OA Sand
19000 20900
Spy Island
eni Petroleum
Emil Opitz
SI13-FN4
3829
5
3834
Andrew Buchanan
Dt h ft C1 C1 C1 C1
1
19140
Interpretation:
GU i t 938 80000Md C h l i d ( / L )
Hydrocarbon Ratios
Non-producible Hydrocarbons based upon field chromatograph data.
Depth ft C1 C1 C1 C1
Flowline Background Show C2 C3 C4 C5
ppm ppm ppm
Hydrocarbon Ratios
C1 -=C1/C2 =
C2 -=C1/C3 =
C3 -=C1/C4 =
C4 -=C1/C5 =
C5 -=
19140 Gas Units
602476
938
431 49
96242
252
202
152
633
284
623 147
382
673 40
3898 100140
124 160
80000Mud Chlorides (mg/L) =
1000
NPH
Production
Analysis Gas Oil Water x Non-Producible Hydrocarbons
Depth ft
Flowline Background Show
ppm ppm ppm
Hydrocarbon Ratios
C1 -=C1/C2 =
C2 -=C1/C3 =
2
Gas Units
118154
796 870
19707
122833
1172
74
4679
Mud Chlorides (mg/L) =
148
253
75000
10
100
Gas
C3 -=C1/C4 =
C4 -=C1/C5 =
C5 -=
Production
Analysis Gas Oil Water x Non-Producible Hydrocarbons
Depth ft C1 C1 C1 C1
Flowline Background Show C2 C3 C4 C5
ppm ppm ppm
Hydrocarbon Ratios3
Gas Units
443
93
391 241
560
19899
444 177
788467
150
267
1043 Mud Chlorides (mg/L) =75000
1
Oil
NPH
pp pp pp
Hydrocarbon Ratios
C1 -=C1/C2 =
C2 -=C1/C3 =
C3 =C1/C4 =
C4 -=C1/C5 =
C5 -=
Production
Analysis Gas Oil Water x Non-Producible Hydrocarbons
4
431
738
142
251
792
417241 132
177
373
109239 4679
93
812 74
524
243
428
104560
100
1000
NPH
Depth ft
Flowline Background Show
ppm ppm ppm
Hydrocarbon Ratios
C1 -=C1/C2 =
C2 -=C1/C3 =
C3 -=C1/C4 =
C4 -=C1/C5 =
4
573
Gas Units
254
547
82106
810
401
143
41 323
150 257 107
619 46
20830
295 90 205
364
87322 5216
Mud Chlorides (mg/L) =77000
10
NPH
Oil
Gas
C5 -=
Production
Analysis Gas Oil Water x Non-Producible Hydrocarbons
295 90 205
1
NPH
Marker MD INC AZ TVD TVDSS
16" Surface Borehole
20" Conductor Shoe 160.0 0.7 273.8 160.0 -106.1
SV-4 771.0 17.1 309.4 764.1 -710.1
SV-3 1,173.0 32.2 315.8 1,123.9 -1,069.9
SV-2 1,493.0 42.1 309.5 1,380.0 -1,326.0
Permafrost Base 1,993.0 45.1 312.3 1,745.7 -1,691.7
SV-1 2,275.0 53.3 313.6 1,933.2 -1,879.2
Ugnu Top (UG4)2,942.0 71.2 303.5 2,257.9 -2,203.9
13 3/8" Casing Shoe 3,719.0 80.1 312.9 2,418.4 -2,364.4
TD 16" Borehole 3,735.0 80.1 313.3 2,421.1 -2,367.1
12 1/4" Intermediate Borehole
UG-2 Coal Bed Marker 5,343.0 78.2 309.7 2,746.0 -2,692.0
Lower Ugnu 8,490.0 78.3 308.6 3,380.1 -3,326.1
Schrader Bluff Top 9,732.0 79.3 311.2 3,628.0 -3,574.0
N Sequence Top 9,886.0 78.8 313.5 3,654.0 -3,600.0
N Top 10,140.0 78.4 314.3 3,700.2 -3,646.2
N-2 Top 10,152.0 78.2 314.2 3,710.0 -3,656.0
N-3 Top 10,181.0 77.9 314.1 3,715.9 -3,661.9
N Bottom 10,236.0 78.3 314.3 3,727.0 -3,673.0
Lower N Marker 10,363.0 80.4 316.7 3,750.6 -3,696.6
N Sequence Base 10,733.0 84.6 321.6 3,797.0 -3,743.0
9 5/8" Intermediate Casing 11,446.0 87.2 326.1 3,845.8 -3,791.8
TD 12 1/4" Borehole 11,453.0 87.2 326.0 3,846.2 -3,792.2
8 3/4" Lateral Borehole
OA Top 11,528.0 87.0 323.9 3,849.9 -3,795.9
OA-2 Top 12,630.0 89.5 324.9 3,847.2 -3,793.2
OA-3 Top 12,748.0 88.6 323.3 3,849.3 -3,795.3
OA-3 Top 13,233.0 93.0 319.8 3,846.7 -3,792.7
OA-2 Top 13,314.0 92.9 320.0 3,842.7 -3,788.7
OA-2 Top 13,529.0 86.7 317.7 3,842.6 -3,788.6
OA-3 Top 13,577.0 86.5 317.1 3,845.4 -3,791.4
OA-3 Top 14,360.0 93.1 316.6 3,846.1 -3,792.1
OA-2 Top 14,427.0 93.4 314.6 3,842.2 -3,788.2
OA Top 14,551.0 93.4 311.7 3,834.8 -3,780.8
OA Top 14,647.0 89.0 309.3 3,832.7 -3,778.7
OA-2 Top 15,574.0 87.1 311.5 3,832.5 -3,778.5
OA-3 Top 15,811.0 88.0 314.2 3,839.4 -3,785.4
OA-4 Top 16,139.0 86.7 313.0 3,858.4 -3,804.4
OA Bottom 16,234.0 88.9 312.2 3,862.0 -3,808.0
OA Bottom 16,331.0 94.7 312.1 3,859.3 -3,805.3
OA-4 Top 16,414.0 94.5 310.9 3,852.8 -3,798.8
OA-3 Top 17,238.0 92.2 310.9 3,836.4 -3,782.4
OA-2 Top 17,428.0 92.5 314.2 3,829.1 -3,775.1
OA-2 Top 18,699.0 86.8 309.8 3,823.8 -3,769.8
OA-3 Top 18,791.0 87.1 308.7 3,828.6 -3,774.6
OA-3 Top 19,472.0 91.0 311.9 3,830.3 -3,776.3
OA-3 Top 19,614.0 89.0 311.5 3,830.1 -3,776.1
OA-3 Top 20,109.0 91.7 311.5 3,830.4 -3,776.4
OA-2 Top 20,313.0 91.6 310.0 3,823.7 -3,769.7
Int Fault 1 20,911.0 89.1 309.2 3,828.6 -3,774.6
TD 8 3/4" Borehole 20,974.0 89.1 309.2 3,829.7 -3,775.7
SI13-FN4 Interpolated Tops
0
1000
2000
3000
4000
5000
6000
7000
8000
9000
10000
11000
12000
13000
14000
15000
16000
17000
18000
19000
20000
21000
22000
0 5 10 15 20 25 30 35
Me
a
s
u
r
e
d
D
e
p
t
h
Rig Days
Prognosed
Actual
SI13-FN4
Days vs. Depth
11 Nov 2012
Reached surface
TD at 2110 hrs
3735' MD / 2421' TVD
23 Nov 2012
Run & Land 9 5/8"
casing at 9496' MD
26 Nov 2012
RIH with BHA #5, CBL,
FIT to12.0 ppg EMW,
Drill ahead
13 Nov 2012
Run & Land
13 3/8" casing at
3720' MD
15 Nov 2012
RIH with BHA #3,
FIT 12.8.0 ppg EMW,
Drill ahead
07 Nov 2012
SDL rig up
unit and gas
equipment
09 Nov 2012
Pre Spud
meeting and
spud the well
20 Nov 2012
Reached intermediate TD at
1830 hrs
11453' MD / 3846' TVD
30 Nov 2012
Reached production TD
at 1930 hrs
20974' MD / 3833' TVD
19 Nov 2012
RIH with BHA #4
18 Nov 2012
POOH @ 9494' MD/
3582' TVD due to
Xceed tool failure
Surface Data Logging
After Action Review
Employee Name: Leigh Ann Rasher Date: 14-Nov-2012
Well: SI13-FN4 Hole Section: Surface
What went as, or better than, planned:
Insite worked as it was supposed to with minimal to no problems.The vortex cooler is up
and running reducing the amount of moisture in the poly flow lines. Also, we are now
running off of rig air. We had a line plumbed into the pump room, allowing use to run the
rig air through the umbilical cord which eliminates any possibility of the line freezing up.
Difficulties experienced:
Due to this being the first well that the vortex cooler has been operational we had to
keep a close eye on the temperature and RPMs for the condensate pump on the cooler.
We are still learning what settings to use to keep this two parameters close to be
constant.
Recommendations:
Continue to keep an eye on the vortex cooler data.
Innovations and/or cost savings:
Surface Data Logging
After Action Review
Employee Name: Leigh Ann Rasher Date: 25-Nov-2012
Well: SI13-FN4 Hole Section: Intermediate
What went as, or better than, planned:
INSITE worked well with minimal to no problems. The vortex cooler seems to be
reducing moisture in the poly flow lines. Gas equipment worked fine.
Difficulties experienced:
The Canrig computer froze on several occassions during the intermediate section,
causing a loss of ROP, WOB, and RPM data on the log. It is impossible for the Logger to
prevent this from happening, the only solution is to reboot Canrig computer and adjust
the depth in INSITE once everything is back up and running.
Recommendations:
Keep a close eye on Canrig computer in the future to prevent any major data gaps on
the log. Ideal situation would be for Canrig to supply a much more reliable computer
Innovations and/or cost savings:
None for this section.
Surface Data Logging
After Action Review
Employee Name: Emil Opitz Date: 1 December 2012
Well: SI13-FN4 Hole Section: Production
What went as, or better than, planned:
Vortex cooler reduced amount of moisture being carried from gas trap to unit to a
negligble amount and lag has been accurate.
Difficulties experienced:
1. Issues arose with the WITS connection to Canrig. After over 6 hours of
troubleshooting, including 3 hours on the phone with Canrig Support on 3 separate
phone calls, we had resorted to calculating lag manually and using the mud mans
computer for pump strokes. Shortly thereafter, Canrig's computer began working again.
2. One of our computers failed mid-run. This was a "pizza box" style computer. It was
mainly responsible for supplying a constant WITS feed to Petrolink per the contract.
3. Power was lost to our unit. When power was restored initially, we had only partial
capabilities, and no heat.
Recommendations:
Power issue was on the rig side of our electrical connection/supply. The rig electritian
should inspect our connection from end to end each time we rig up and rig down.
Innovations and/or cost savings:
Long term health of gas equipment will improve with reduced amount of moisture
entering them, due to use of the Vortex Cooler.