Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout212-090MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission DATE:Wednesday, May 14, 2025 SUBJECT:Mechanical Integrity Tests TO: FROM:Sully Sullivan P.I. Supervisor Petroleum Inspector NON-CONFIDENTIAL Hilcorp Alaska, LLC SI25-N02 NIKAITCHUQ SI25-N02 Jim Regg InspectorSrc: Reviewed By: P.I. Suprv Comm ________ JBR 05/14/2025 SI25-N02 50-629-23472-00-00 212-090-0 W SPT 3752 2120900 1500 559 559 560 560 110 114 120 110 4YRTST P Sully Sullivan 4/15/2025 30 MinPretestInitial15 Min Well Name Type Test Notes: Interval P/F Well Permit Number: Type Inj TVD PTD Test psi API Well Number Inspector Name:NIKAITCHUQ SI25-N02 Inspection Date: Tubing OA Packer Depth 25 1710 1661 1652IA 45 Min 60 Min Rel Insp Num: Insp Num:mitSTS250416120900 BBL Pumped:3.5 BBL Returned:3.1 Wednesday, May 14, 2025 Page 1 of 1 9 9 9 9 9 9 9 999 99 9 9 9 9 James B. Regg Digitally signed by James B. Regg Date: 2025.05.14 12:41:04 -08'00' MEMORANDUM TO: JintRegg 2 5441(�t P.I. Supervisor FROM: Guy Cook Petroleum Inspector Well Name NIKAITCHUQ S125-NO2 Insp Num: mitGDC210501113211 Rel Insp Num: NON -CONFIDENTIAL State of Alaska Alaska Oil and Gas Conservation Commission DATE: Wednesday, May 5, 2021 SUBJECT: Mechanical Integrity Tests Eni US Operating Company Inc. S125-NO2 NIKAITCHUQ SI25-1402 Src: Inspector Reviewed By: P.I. Supry Comm API Well Number 50-629-23472-00-00 Inspector Name: Guy Cook Permit Number: 212-090-0 Inspection Date: 4/30/2021 Notes: Testing done with a triplex pump. calibrated gauges and a bleed trailer. Ie-S� D2CeAi- 7 -ow Wednesday, May 5, 2021 Page I of 1 Packer Depth Pretest Initial 15 Min 30 Min 45 Min 60 Min Well S125 NO2Tye Ipe Ip nj ��' TVD ��5'- Tubing 506 506 506 507 - PT� 2120900 -Type Test Nest psi 19u0 IA 8521737 1719 1714 BBL Pum ed: t.5 - 11131- Returned: P--�--- i.1. - OA 140 154 140 - 140 - Interval 4YRTST P/F — - -- _ _ Notes: Testing done with a triplex pump. calibrated gauges and a bleed trailer. Ie-S� D2CeAi- 7 -ow Wednesday, May 5, 2021 Page I of 1 0 • MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission TO Jim Regg DATE: Wednesday,December 28,2016 P.I.Supervisor (c e( (Z 2,-0 1t SUBJECT: Mechanical Integrity Tests ENI US OPERATING CO INC SI25-NO2 FROM: Jeff Jones NIKAITCHUQ S125-NO2 Petroleum Inspector Src: Inspector Reviewed By: P.I.Supry TP— NON-CONFIDENTIAL Comm Well Name NIKAITCHUQ S125-NO2 API Well Number 50-629-23472-00-00 Inspector Name: Jeff Jones Permit Number: 212-090-0 Inspection Date: 12/10/2016 Insp Num: mitJJ161212171646 Rel Insp Num: Packer Depth Pretest Initial 15 Min 30 Min 45 Min 60 Min SI25-NO2 W 3752 339 339 339 . 339 2120900 SPTT IAng �— - well Type Inj TVD PTD Type Test Test psi 1500638 1658 - 1644 - 1640 YP Interval I4YRTST P/F P ✓ OA , 150 430 - 430 - 400 Notes: 2 barrels diesel pumped. 1 well inspected,no exceptions noted. ✓ SCANNED APR 0 5 201? Wednesday,December 28,2016 Page 1 of 1 Technical Report Title Date Client: ENI Petroleum Field: Nikaitchuq Rig: Doyon 15 Date: August 26, 2012 Surface Data Logging End of Well Report SI25-N2 TABLE OF CONTENTS 1. General Information 2. Daily Summary 3. Morning Reports 4. Bit Record 5. Mud Record 6. Show Reports 7. Formation Tops 8. Survey Report 9. Days vs. Depth Digital Data to include: Final Logs Halliburton Log Viewer EMF Log Viewer End of Well Report in PDF format ADI Backup GENERAL WELL INFORMATION Company: Eni Petroleum Rig: Doyon 15 Well: SI25-N2 Field: Nikaitchuq Borough: North Slope Borough State: Alaska Country: United States API Number: 50-629-23472-00-00 Sperry Job Number: AK-AM-0009649170 Job Start Date: 23 Jul 2012 Spud Date: 25 Jul 2012 Total Depth: 13,882’ MD, 3748.7’ TVD Total Depth Date: 16 Aug 2012 North Reference: True Declination: 20.390˚ Dip Angle: 81.064˚ Total Field Strength: 57620.589 nT Date Of Magnetic Data: 30 Jul 2012 Wellhead Coordinates N: North 70° 33’ 27.80147” Wellhead Coordinates W: West 149° 54’ 20.28898“ Drill Floor Elevation: 53.920’ Ground Elevation: 13.1’ Permanent Datum: Mean Sea Level SDL Engineers: Zachary Beekman, Emil Opitz, Christina Medlyn, Leigh Ann Rasher Company Geologist: Andrew Buchanan Company Representatives: Jack Keener, Mike Ross SSDS Unit Number: 110 DAILY SUMMARY Begin SI25-N2 07/23/2012 Rig is being moved. Mudloggers are on standby. 07/24/2012 Rig is being moved. Mudloggers are on standby. 07/25/2012 Mudloggers rigged up equipment in the unit to get ready to spud. The rig crew began to load pipe shed with 5” drill pipe. Picked up 5” drill pipe, filled pits with spud mud and pick up tools. 07/26/2012 Continue picking up BHA #2. Drill ahead from 160’ MD to 250’ MD, encountered heavy clay and had to clear the flow line. Continue drilling ahead from 250’ MD and pull out of hole to pick up final BHA #2. Run in hole to 280’ MD and drill ahead to 1332’ MD at 602 gpm, 1030 psi, 40 rpm, and 20-30K WOB as of midnight. Max gas observed during the last 24 hours was 54 units at a depth of 1031’ MD. 07/27/2012 Continue drilling ahead from 1332’ MD to TD at 2936’ MD. Circulate 3 bottoms up while back reaming out of the hole from 2936’ MD to 2710’ MD. Continue to back ream out of the hole to 1502’ MD at 800 gpm and 1500 psi as of midnight. Max gas observed during the last 24 hours was 4202 units at a depth of 1887’ MD with a chromatograph reading of predominantly Methane gas. While back reaming out of the hole, high gas was observed again while back reaming from 1900’-1800’ MD. 07/28/2012 Continue to back ream out of the hole from 1502’ MD to BHA #2. Lay down BHA #2. Rig up the 13 3/8” casing equipment. Check float and run in hole with the 13 3/8” casing to 2922’ MD, filling every 10 joints. Break circulation at 7 bpm with no losses. Had an issue with the hanger hanging up in the riser stack. The decision was made to cement with the hanger set. Rig down the casing equipment and circulate and condition the mud for the cement job. Max gas observed while circulating on bottom was 117 units. 07/29/2012 Continue to condition the mud for the cement job. Rig up the cementers and proceed with the cement job. Clean all surface equipment of cement. Rig down the cement crew. Nipple down the riser. Nipple up the well head and BOP stack. Test the BOP stack as of midnight. 07/30/2012 Continue testing the BOP’s. Pick up BHA #3. Run in hole to 1213’ MD and perform a shallow hole test per DD. Run in hole from 1213’ MD to 2718’ MD and wash to 2809’ MD. Test the 13 3/8” casing to 2500 psi for 30 minutes. Continue to wash to 2840’ MD and tag the plug. Drill out the shoe track and the shoe, then drill 20’ of new hole to 2955’ MD. Displace spud mud with 9.2 ppg LSND. Clean the surface equipment and cut and slip drill line. Circulate bottoms up and perform an FIT to 12.2 ppg EMW. Rig down the testing equipment as of midnight. 07/31/2012 Continue drilling ahead from 2955’ MD to 4790’ MD at 750 gpm, 1120 psi, and 60-80 rpm as of midnight. Encountered calcareously cemented sandstones/siltstones reducing ROP. Max gas observed during the last 24 hours was 84 units at a depth of 3088’ MD. 08/01/2012 Continue drilling ahead from 4790’ MD to 4865’ MD. Encountered more erratic torque and slow drilling. Varied drilling parameters were noticed and the decision was made to pull out of the hole. Back ream from 4865’ MD to 2905’ MD. Circulate 2 bottoms up with semi heavy unloading at the shakers. Pump a dry job and pull out of the hole on elevators. Lay down BHA #3. Pick up BHA #4 with a new 12 ¼” PDC bit. Run in hole and shallow test the MWD. Continue running in hole as of midnight. 08/02/2012 Continue to run in hole with BHA #4. Wash and ream from 4678’ MD to 4864’ MD. Circulate and condition the mud to get to 900 gpm. Drill ahead from 4864’ MD to 5515’ MD at 897 gpm. 1580 psi, 180 rpm as of midnight. Max gas observed during the last 24 hours was 59 units at a depth of 5437’ MD. 08/03/2012 Continued drilling ahead from 5515’ MD to 7680’ MD with 2-10K WOB, 120-180 rpm, 800-900 gpm, and 1500 psi. Still encountering hard spots during drilling with slow ROP. Max gas observed during the last 24 hours was 2294 units during the N Sand at a depth of 7064’ MD. 08/04/2012 Continued drilling ahead from 7680’ MD to TD at 7930’ MD. Circulate one bottoms up for the first five stands per K&M rep. Continue back reaming out of the hole to 2904’ MD at 140 rpm, 900 gpm, and 1750 psi as of midnight. Max gas observed during the last 24 hours was 2765 units at a depth of 7848’ MD. 08/05/2012 Continue to back ream out of the hole from 2904’ MD to 1000’ MD. Circulate three bottoms up. Continue to pull out of the hole on elevators. Lay down BHA #4. Prep and change out the rams to 9 5/8” and test. Rig up the 9 5/8” casing equipment. Run in hole without filling casing to 3404’ MD as of midnight. 08/06/2012 Continue running in hole with 9 5/8” casing. Began rotating from 4964’ MD to 7920’ MD. Rig down casing equipment. Rig up cementing head with bleeder open to choke “poor boy to relieve trapped air from pipe. Hold a prejob safety meeting on filling the pipe. Fill pipe per plan to about 300 bbls, 150 bbls, and 100 bbls. Finish filling pipe. Break circulation at .5 bpm and staged up to 6.5 bpm and condition the mud for cement as of midnight. 08/07/2012 Check calibrations of gas gear. Total Gas Analyzer calibration is reading correctly; detecting 998 units when 1000 units are being supplied. Gas Chromatograph is also reading properly; detecting a total of 24,530 ppm of a total 24,640 ppm supplied to the instrument, which yields an effective error of 0.45%. 08/08/2012 Finish BOP testing. Pick up and run in hole with 5” drill pipe joints. Slip and cut drill line. Finish running in hole with 5” drill pipe. Pull out of hole, installing WEI subs and racking back stands. Test casing to 2000 psi for 10 minutes. Pick up BHA #5 and begin to run in hole. 08/09/2012 Run in hole with BHA #5. Shallow test MWD tools – OK. Cement bond log from 2890’ MD to 7748’ MD. Tag float collar at 7828’ MD. Circulate and condition 9.2ppg LSND mud in preparation for casing test. Perform casing test to 3000 psi for 30 minutes. Test WEI manifold to 3000 and 5000 psi. Displace LSND to 9.3 ppg FazePro OBM. 08/10/2012 Drill 20’ of new hole to 7950’ MD. Circulate and condition mud for Formation Integrity Test. Perform FIT to 13.0 ppg EMW. Drill ahead. Samples consist primarily of unconsolidated sand, with lesser amounts of siltstone. Maximum gas of 1911 units, and average gas of 790 units. 08/11/2012 Drill ahead to 9860’ MD. Troubleshoot Xceed tool. Pull out of hole due to Xceed tool failure. BROOM per K&M. Lay down BHA #5. Samples consisted primarily of unconsolidated sand. Maximum gas of 730 units, and average gas of 451 units. 08/12/2012 Finish Laying down BHA #5. During this time, the top drive began leaking hydraulic fluid. Commenced repairing the top drive and conducting rig maintenance. 08/13/2012 Finish repairing blown seal on top drive. Finish up rig maintenance. Begin to pick up BHA #6. 08/14/2012 Run in hole with BHA #6, and shallow test MWD tools – OK. Run in hole circulating every 20 stands to condition mud. Wash down from 9392’ MD to bottom. Drill ahead. Samples consisted primarily of unconsolidated sands, with lesser amounts of siltstone. Maximum gas of 1483 units, with average gas of 812 units. 08/15/2012 Drill ahead. Cuttings consist primarily of unconsolidated sands, with lesser amounts of calcareously cemented sandstone and siltstone. Maximum gas of 1322 units, with average gas of 467 units. 08/16/2012 Drill ahead to Final TD of 13882’ MD. Monitor well – static. Backream out of hole per K&M representative. Cuttings consisted primarily of unconsolidated sand, with lesser amounts of calcareously cemented sandstone and siltstones. Maximum gas of 881 units, with average gas of 404 units. 08/17/2012 Backream out of hole per K&M representative. Background gas of 18 units. 08/18/2012 Continue to BROOH per K&M. Lay down BHA #6. Pick up BHA #7 and run in hole for clean out run. Background gas of 16 units, with maximum trip gas of 155 units. 08/19/2012 Circulate and condition mud prior to spotting FazeAway breaker on bottom. Pump breaker. Pull out of hole. Lay down BHA #7. Maximum trip gas of 71 units. 08/20/2012 Run in hole with 4.5” liner to 6179’ MD. Make up hangar. Set packer. Cut and slip drill line. Lay down 5” drill pipe. . . Density (ppg) Viscosity out (sec/qt) Mud Data Casing Summary Grade ROP Set At Size 178.9 X-65 Bit # Current in Footage Area: Location: Max @ ft Silt Siltst Lst @4.23 Tuff Rig: Job No.: Current Depth: 24 Hour Progress: Daily Charges: 96% SPP (psi) Gallons/stroke % ROP (ft/hr) Bit Type TFA pH Yesterday's Depth: Flow In (gpm) Hours EVAMAR cP $6,610.00 Report For: Keener/Smith/Buchanan 0' 160' 160' Current Pump & Flow Data: Total Charges: 4.0 P/U BHA #2 Rig Activity: Flow In (spm) $2,810.00 (ppb Eq) Weight Hughes MX-1 Milltooth 160' Lithology (%) Ss 20" Cht Sh Clyst Cly PV MBT MWD Summary Depth 0' to 160' Tools ENI Petroleum SI25-N2 Spy Island 24 hr Max North Slope Doyon 15 AK-AM-0009649170 Customer: Well: Avg 3 25-Jul-2012 24:00 Time: Report #: Date: 21.3 35 1.117 37 Size 16" WOB Depth in / out (current) YP 1 8.70 (lb/100ft 2) 160' Make 9.40 Condition 160' Spud Mud Depth Mud Type 113 mg/l Coal Gvl API FL 4.0 Cor Solids Chlorides 900 ECD (ppg) Avg Min Max Gamma, Resistivity, PWD ml/30min RPM *10000 units = 100% Gas In Air 0 0 Connection 0 0 N/A C-5n Zach Beekman C-3 0 Logging Engineers: Zach Beekman / Christina Medlyn (max) (current) Report By: (max) 0 0 Chromatograph (ppm) 00 0 Minimum C-4i C-5i C-1 0 000 pipe. Take on 730 bbls of spud mud from the mud plant. Rig up wireline for Gyrodata. Pre spud meeting. Pick up BHA #1 and clean Continue to pick up 5" drill pipe. Work on suitcases for WIF and Mud Plant, test suitcases. Pick up heavy weight drill md. Average 0 C-4n 0 Gas Summary C-2 Depth Units* 0000 0 Maximum 907-685-0772 Unit Phone: N/A 24 hr Recap: N/A Background out the 20" conductor to 160' MD to be able to pick up BHA #2. Pick up BHA #2 as of midnight. Trip . . Density (ppg) Viscosity out (sec/qt) ml/30min RPM ECD (ppg) Avg Min Max Gamma, Resistivity, PWD mg/l Coal Gvl API FL 4.8 Cor Solids Chlorides 2,600 Spud Mud Depth Mud Type 80 9.80 Condition 1032' YP 1 9.20 (lb/100ft 2) 160' 1172' Make (current) 80.0 31 1.117 23 Size 16" WOB Depth in / out 4 26-Jul-2012 24:00 Time: Report #: Date: ENI Petroleum SI25-N2 Spy Island 24 hr Max North Slope Doyon 15 AK-AM-0009649170 Customer: Well: Avg MWD Summary Depth 160' to 1332' Tools Sh Clyst Cly Cht Hughes MX-1 Milltooth 160' Lithology (%) Ss 20" Total Charges: 5.0 Drilling Ahead Rig Activity: Flow In (spm) 579.3 $2,810.00 (ppb Eq) 56.1 160' 1332' 1172' Current Pump & Flow Data: 1060' EVAMAR 1277 cP $9,420.00 Report For: Keener/Smith/Buchanan Weight PV MBT pH Yesterday's Depth: Flow In (gpm) Hours ROP (ft/hr) Bit Type TFA % Rig: Job No.: Current Depth: 24 Hour Progress: Daily Charges: 96% 639 151 SPP (psi) Gallons/stroke @4.23 Tuff Silt Siltst Lst Max @ ft Area: Location: Footage 119.6 Grade ROP Set At Size 178.9 X-65 Bit # Current in Mud Data Casing Summary *10000 units = 100% Gas In Air was ahead to 1332' MD at 602 gpm, 1030 psi, 40 rpm, and 20-30K wob as of midnight. Max gas observed during the last 24 hours 54 Trip 907-685-0772 Unit Phone: N/A 24 hr Recap: 38 Background Maximum 1031' 294' 0 0 000 Depth Units* Gas Summary C-2 0 line. Continue drilling ahead from 250' MD to 280' MD and pull out of hole to pick up final BHA #2. Run in hole to 280' MD and drill Continue picking up BHA #2. Drill ahead from 160' MD to 250' MD, encountered heavy clay and had to clear the flow 22 md. Average 00012 C-5i C-1 0 C-4n 0 0 Minimum C-4i Chromatograph (ppm) 0 (max) 1517 6 6010 Logging Engineers: Zach Beekman / Christina Medlyn (max) (current) Report By: N/A C-5n Zach Beekman C-3 0 0 0 Connection 0 0 . . Density (ppg) Viscosity out (sec/qt) Mud Data Casing Summary ROP Set At Size 178.9 X-65 Bit # Current in Grade Area: Location: Max @ ft Footage Silt Siltst Lst @4.23 Tuff Daily Charges: 96% 795 188 SPP (psi) Gallons/stroke % ROP (ft/hr) Bit Type TFA pH Yesterday's Depth: Flow In (gpm) Hours EVAMAR 1285 cP $12,230.00 Report For: Keener/Smith/Buchanan Weight PV MBT 93.2 1332' 2936' 1604' Current Pump & Flow Data: 2695' Rig: Job No.: Current Depth: 24 Hour Progress: Total Charges: 8.0 BROOH Rig Activity: Flow In (spm) 612.5 $2,810.00 (ppb Eq) Hughes MX-1 Milltooth 160' Lithology (%) Ss 20" Cht Sh Clyst Cly MWD Summary Depth 1332' to 2936' Tools ENI Petroleum SI25-N2 Spy Island 24 hr Max North Slope Doyon 15 AK-AM-0009649170 Customer: Well: Avg 5 27-Jul-2012 24:00 Time: Report #: Date: 21.3 34 1.117 32 Size 16" WOB Depth in / out (current) YP 1 9.55 (lb/100ft 2) 160' 2936' 2776' Make 9.40 Condition 2936' Spud Mud Depth Mud Type 94 mg/l Coal Gvl API FL 5.2 Cor Solids Chlorides 1,000 ECD (ppg) Avg Min Max Gamma, Resistivity, PWD ml/30min RPM *10000 units = 100% Gas In Air 0 0 Connection 0 0 N/A C-5n Zach Beekman C-3 0 Logging Engineers: Zach Beekman / Christina Medlyn (max) (current) Report By: (max) 25155 14 305732 Chromatograph (ppm) 00 0 Minimum C-4i C-5i C-1 0 C-4n 00942 from 2936' MD to 2710' MD. Continue to back ream out of the hole to 1502' MD at 800 gpm and 1500 psi as of midnight. Max gas Continue drilling ahead from 1332' MD to TD at 2936' MD. Circulate 3 bottoms up while back reaming out of the hole 223 md. Average 0 77 Gas Summary C-2 Depth Units* 0010 0 Maximum 1887' 1390' 907-685-0772 Unit Phone: N/A 24 hr Recap: 36 Background gas. While back reaming out of the hole observed high gas again while back reaming from 1900'-1800' MD. observed during the last 24 hours was 4202 units at a depth of 1887' MD with a chromatograph reading of predominantly Methane 4202 Trip . . Density (ppg) Viscosity out (sec/qt) ml/30min RPM ECD (ppg) Avg Min Max Gamma, Resistivity, PWD mg/l Coal Gvl API FL 6.0 Cor Solids Chlorides 1,000 Spud Mud Depth Mud Type 79 2936' Condition YP 1 9.45 (lb/100ft 2) 160' 2936' 2776' Make (current) 21.5 32 1.117 23 Size 16" WOB Depth in / out 6 28-Jul-2012 24:00 Time: Report #: Date: ENI Petroleum SI25-N2 Spy Island 24 hr Max North Slope Doyon 15 AK-AM-0009649170 Customer: Well: Avg MWD Summary Depth 2936' to 2936' Tools Sh Clyst Cly Cht Hughes MX-1 Milltooth 160' Lithology (%) Ss 20" 6.5 Condition for Cement Rig Activity: Flow In (spm) $2,810.00 (ppb Eq) 9.00 2936' 2936' 0' Current Pump & Flow Data: Rig: Job No.: Current Depth: 24 Hour Progress: Total Charges: cP $15,040.00 Report For: Keener/Smith/Buchanan Weight PV MBT Yesterday's Depth: Flow In (gpm) Hours EVAMAR 139 ROP (ft/hr) Bit Type TFA pH % Daily Charges: 96% 274 64 SPP (psi) Gallons/stroke Lst @4.23 Tuff Footage Silt Siltst Max @ ft Grade Area: Location: ROP Set At Size 178.9 X-65 Bit # Current in Mud Data Casing Summary *10000 units = 100% Gas In Air bottom was 117 units. casing equipment and circulate and condition the mud for the cement job as of midnight. Max gas observed once circulating on no losses. Had issue with the hanger hanging up in the riser stack. Decision was made to cement with hanger set. Rig down the Trip 907-685-0772 Unit Phone: N/A 24 hr Recap: 19 Background Maximum 0 0 000 Units* Gas Summary C-2 Continue to back ream out of the hole from 1502' MD to BHA #2. Lay down BHA #2. Rig up the 13 3/8" casing md. Average 0 0 000 Depth C-5i C-1 0 C-4n 0 0 Minimum C-4i 0 Chromatograph (ppm) 0 (max) 0 Logging Engineers: Zach Beekman / Christina Medlyn (max) (current) Report By: equipment. Check float and run in hole with the 13 3/8" casing to 2922' MD, filling every 10 joints. Break circulation at 7bpm with N/A C-5n Zach Beekman C-3 0 0 0 Connection 0 0 . . Density (ppg) Viscosity out (sec/qt) Mud Data Casing Summary ROP Set At Size 178.9 X-65 Bit # Current in Area: Location: L-80 Max @ ft Grade Silt Siltst @4.23 Tuff Footage 96% SPP (psi) Gallons/stroke Lst % BTC ROP (ft/hr) Bit Type TFA pH Yesterday's Depth: Flow In (gpm) Hours EVAMAR cP $18,450.00 Report For: Keener/Smith/Buchanan Weight PV MBT (ppb Eq) 8.40 2936' 2936' 0' Current Pump & Flow Data: Current Depth: 24 Hour Progress: 20" 6.0 Test BOP Rig Activity: Flow In (spm) $3,410.00 160' 2922' Lithology (%) Ss Cht 13 3/8" Hughes MX-1 Milltooth Sh Clyst Cly Customer: Well: Avg MWD Summary Depth 2936' to 2936' Tools Rig: SI25-N2 Spy Island 24 hr Max North Slope Doyon 15 AK-AM-0009649170 Job No.: Total Charges: Daily Charges: 16" WOB Depth in / out 7 29-Jul-2012 24:00 Time: Report #: Date: ENI Petroleum 21.0 16 1.117 16 Size Make (current) 68.0 YP 1 9.40 (lb/100ft 2) 160' 2936' 2776' Condition 53 2922' Chlorides 1,000 Spud Mud Depth Mud Type mg/l Coal Gvl API FL 6.0 Cor Solids ml/30min RPM ECD (ppg) Avg Min Max *10000 units = 100% Gas In Air 0 0 Connection 0 0 N/A C-5n Zach Beekman C-3 0 Logging Engineers: Zach Beekman / Christina Medlyn (max) (current) Report By: equipment of cement. Rig down the cement crew. Nipple down the riser. Nipple up the well head and BOP stack. Test BOP stack (max) 0 Chromatograph (ppm) 00 0 Minimum C-4i 0 C-5i C-1 0 C-4n 000 Continue to condition the mud for cement job. Rig up cementers and proceed with cement job. Clean all surface md. Average 0 0 Gas Summary C-2 Units* Depth 0000 0 Maximum 907-685-0772 Unit Phone: N/A 24 hr Recap: Trip as of midnight. Background . . Density (ppg) Viscosity out (sec/qt) Max 12 1/4" 0.969 2936' ml/30min RPM ECD (ppg) Avg Min mg/l Coal Gvl API FL 6.8 Cor Solids LSND Depth Mud Type 2955'600 Condition YP 1 9.20 (lb/100ft 2) 160' 2936' 2776' 46 Make (current) 68.0 2.0 19 1.117 9 Size Depth in / out 8 30-Jul-2012 24:00 Time: Report #: Date: ENI Petroleum Chlorides Gamma, Resistivitey, PWD SI25-N2 Spy Island 24 hr Max North Slope Doyon 15 AK-AM-0009649170 Job No.: Total Charges: Daily Charges: Customer: Well: Avg MWD Summary Depth 2936' to 2955' Tools Rig: Sh Clyst Cly Cht 13 3/8" Hughes MX-1 Milltooth 16" Hycalog SKHI716-E4C 160' 2922' Lithology (%) Ss 20" 4.0 R/D FIT Test Equip Rig Activity: Flow In (spm) $3,410.00 WOB 2936' 2955' 19' Current Pump & Flow Data: Current Depth: 24 Hour Progress: $21,860.00 Report For: Keener/Smith/Buchanan Weight PV MBT 2 (ppb Eq) Yesterday's Depth: Flow In (gpm) Hours EVAMAR 830 ROP (ft/hr) Bit Type TFA pH % BTC 96% 704 166 SPP (psi) Gallons/stroke Lst 9.90 @4.23 Tuff Footage Silt Siltst Max @ ft Grade Area: Location: L-80 ROP Set At Size 178.9 X-65 Bit # Current in 155.2 cP Mud Data Casing Summary *10000 units = 100% Gas In Air Rig down testing equipment as of midnight. 9.2 ppg LSND. Clean the surface equipment and cut and slip drill line. Circulate a bottoms up and perform FIT to 12.2 ppg EMW. 2840' MD and tag the plug. Drill out the shoe track and the shoe, then drill 20' of new hole to 2955' MD. Displace spud mud with Background 907-685-0772 Unit Phone: N/A 24 hr Recap: Trip Maximum 0 0 000 Units* Depth Gas Summary C-2 Continue testing BOP's. Pick up BHA #3. Run in hole to 1213' MD and perform a shallow hole test per DD. Run in hole md. Average 0 0 000 C-5i C-1 0 C-4n 0 0 Minimum C-4i 0 Chromatograph (ppm) 0 (max) 0 Logging Engineers: Zach Beekman / Christina Medlyn (max) (current) Report By: from 1213' MD to 2718' MD and wash to 2809' MD. Test the 13 3/8" casing to 2500 psi for 30 minutes. Continue to wash to N/A C-5n Zach Beekman C-3 0 0 0 Connection 0 0 . . Density (ppg) Viscosity out (sec/qt) Max 12 1/4" 0.969 2936' ml/30min RPM ECD (ppg) Avg 1,300 Depth in / out Tools Min mg/l Coal Gvl API FL 5.2 1-1-WT-A-1-1-NO-TD Cor Solids LSND Depth Mud Type 4774' Condition 40.0 YP 1 9.25 (lb/100ft 2) 160' 2936' 2776' 52 Make (current) 68.0 10.0 30 1.117 11 Size 9 31-Jul-2012 24:00 Time: Report #: Date: ENI Petroleum Chlorides Gamma, Resistivitey, PWD SI25-N2 Spy Island 24 hr Max North Slope Doyon 15 AK-AM-0009649170 Job No.: Customer: Well: Avg MWD Summary Depth 2955' to 4790' Sh Clyst Cly 10 90 Cht 13 3/8" Rig: Total Charges: Daily Charges: 16" Hycalog SKHI716-E4C 160' 2922' Lithology (%) Ss 20" 5.0 Drilling Ahead Rig Activity: Flow In (spm) 501.6 $3,410.00 WOB Weight 2955' 4790' 1835' Current Pump & Flow Data: 3060' Current Depth: 24 Hour Progress: $25,270.00 Report For: Keener/Smith/Buchanan PV MBT 80.3 2 (ppb Eq) Hughes MX-1 Milltooth Yesterday's Depth: Flow In (gpm) Hours EVAMAR 1086 ROP (ft/hr) Bit Type TFA pH % BTC 96% 744 176 SPP (psi) Gallons/stroke Lst 10.00 @4.23 Tuff Footage Silt Siltst Max @ ft 25.0 Grade Area: Location: L-80 ROP Set At Size 178.9 X-65 Bit # Current in 9.0 cP Mud Data Casing Summary *10000 units = 100% Gas In Air 3088' MD. 84 Background 907-685-0772 Unit Phone: N/A 24 hr Recap: 3 Trip Maximum 0 0 000 Units* Depth Gas Summary C-2 Continue drilling ahead from 2955' MD to 4790' MD at 750 gpm, 1120 psi, and 60-80 rpm as of midnight. Encountering 17 md. Average 0 0 00138 4752' 3088' C-5i C-1 0 C-4n 0 0 Minimum C-4i 8834 Chromatograph (ppm) 0 (max) 1355 5 Logging Engineers: Zach Beekman / Christina Medlyn (max) (current) Report By: calcareously cemented sandstone/siltstone reducing ROP. Max gas observed during the last 24 hours was 84 units at a depth of N/A C-5n Zach Beekman C-3 0 0 0 Connection 0 0 . . Density (ppg) Viscosity out (sec/qt) 140 1-2-CT-S-X-I-NO-PR 0.969 21.50 2936' 4865' 1929' 12 cP Casing Summary ROP Set At Size 178.9 X-65 Bit # Current in L-80 Grade Area: Location: Max @ ft 25.0 Footage Silt Siltst @4.23 Tuff BTC 96% 67 Gallons/stroke Lst ROP (ft/hr) Bit Type TFA pH EVAMAR 301 % Yesterday's Depth: Flow In (gpm) Hours 283 SPP (psi) 9.70 MBT 10.0 2 (ppb Eq) Hughes MX-1 Milltooth Mud Data 2 Hycalog SKHI716-E4C 12 1/4" WOB Weight 4790' 4865' 75' Current Pump & Flow Data: Current Depth: 24 Hour Progress: $28,680.00 Report For: 4.5 RIH w/ BHA #4 Rig Activity: Flow In (spm) 143.6 $3,410.00 4819' Keener/Smith/Buchanan PV 160' 2922' Lithology (%) Ss 20" 90 Cht 13 3/8" Rig: Total Charges: Daily Charges: 16" Sh Clyst Cly 10 Customer: Well: Avg MWD Summary Depth 4790' to 4865' ENI Petroleum Chlorides Gamma, Resistivitey, PWD SI25-N2 Spy Island 24 hr Max North Slope Doyon 15 AK-AM-0009649170 Job No.: 10 1-Aug-2012 24:00 Time: Report #: Date: 17.25 10.0 27 1.117 10 Size Make (current) 68.0 YP 1 9.25 (lb/100ft 2) 160' 2936' 2776' 49 Hycalog SKHI716-E4C Condition 40.0 4864' LSND Depth Mud Type mg/l Coal Gvl API FL 5.6 1-1-WT-A-1-1-NO-TD Cor Solids ml/30min RPM ECD (ppg) Avg 900 Depth in / out Tools Min Max 12 1/4" 0.969 4865' *10000 units = 100% Gas In Air 0 0 Connection 0 0 N/A C-5n Zach Beekman C-3 0 and was decided to pull out of the hole. Back ream from 4865' MD to 2905' MD. Circulate 2 bottoms up with semi heavy unloading Logging Engineers: Zach Beekman / Christina Medlyn (max) (current) Report By: (max) 277 5 837 Chromatograph (ppm) 00 0 Minimum C-4i 4824' C-5i C-1 0 C-4n 0093 4863'0 0 Continue drilling from 4790' MD to 4865' MD. Encountered erratic torque and slow drilling. Varied drilling parameters C-2 7 md. Average Gas Summary Units* Depth 0010 0 Maximum 907-685-0772 Unit Phone: N/A 24 hr Recap: 7 Trip Run in hole and shallow hole test the MWD. Continue running in hole as of midnight. at the shakers. Pump a dry job and pull out of the hole on elevators. Lay down BHA #3. Pick up BHA #4 with new 12.25" PDC bit. 13 Background . . Density (ppg) Viscosity out (sec/qt) Max 12 1/4" 0.969 4865' ml/30min RPM ECD (ppg) Avg 900 Depth in / out Tools Min mg/l Coal Gvl API FL 5.6 1-1-WT-A-1-1-NO-TD Cor Solids LSND Depth Mud Type 5366' Condition 40.0 YP 1 9.25 (lb/100ft 2) 160' 2936' 2776' 21 Hycalog SKHI716-E4C Make (current) 68.0 17.25 10.0 29 1.117 11 Size 11 2-Aug-2012 24:00 Time: Report #: Date: ENI Petroleum Chlorides Gamma, Resistivitey, PWD SI25-N2 Spy Island 24 hr Max North Slope Doyon 15 AK-AM-0009649170 Job No.: Customer: Well: Avg MWD Summary Depth 4865' to 5515' Sh Clyst Cly Cht 13 3/8" Rig: Total Charges: Daily Charges: 16" 160' 2922' Lithology (%) Ss 20" 100 5.0 Drilling Ahead Rig Activity: Flow In (spm) 682.1 $3,410.00 4980' Ross/Smith/Buchanan PV WOB Weight 4865' 5515' 650' Current Pump & Flow Data: Current Depth: 24 Hour Progress: $30,090.00 Report For: MBT 42.6 3 (ppb Eq) Hughes MX-1 Milltooth Mud Data 2 Hycalog SKHI716-E4C 12 1/4" 650' Yesterday's Depth: Flow In (gpm) Hours 801 SPP (psi) 9.80 EVAMAR 1337 % ROP (ft/hr) Bit Type TFA pH BTC 96% 190 Gallons/stroke Lst @4.23 Tuff Footage Silt Siltst Max @ ft 25.0 Grade Area: Location: L-80 ROP Set At Size 178.9 X-65 Bit # Current in 240.7 cP Casing Summary 140 1-2-CT-S-X-I-NO-PR 0.969 21.50 2936' 4865' 1929' 12 *10000 units = 100% Gas In Air the last 24 hours was 59 units at a depth of 5437' MD. 59 Background 907-685-0772 Unit Phone: N/A 24 hr Recap: 10 Trip Maximum 0 0 000 Depth Units* Gas Summary C-2 15 md. Average Continue to run in hole with BHA #4. Wash and ream from 4678' MD to 4864' MD. Circulate and condition the mud to 0 0 00386 5034' 5437' C-5i C-1 0 C-4n 0 0 Minimum C-4i 6692 Chromatograph (ppm) 0 (max) 1229 6 Logging Engineers: Zach Beekman / Christina Medlyn (max) (current) Report By: get to 900 gpm. Drill ahead from 4864' MD to 5515' MD at 897 gpm, 1580 psi, 180 rpm as of midnight. Max gas observed during N/A C-5n Zach Beekman C-3 0 0 0 Connection 0 0 . . Density (ppg) Viscosity out (sec/qt) cP Casing Summary ROP Set At Size 178.9 X-65 Bit # Current in 254.5 L-80 Grade Area: Location: Max @ ft Footage Silt Siltst @4.23 Tuff BTC 96% 190 Gallons/stroke Lst ROP (ft/hr) Bit Type TFA pH EVAMAR 1664 % Yesterday's Depth: Flow In (gpm) Hours 806 SPP (psi) 9.70 MBT 97.2 (ppb Eq) Hycalog SKHI716-E4C Mud Data WOB Weight 5515' 7680' 2165' Current Pump & Flow Data: Current Depth: 24 Hour Progress: $33,500.00 Report For: 6.0 Drilling Ahead Rig Activity: Flow In (spm) 617.6 $3,410.00 6485' Ross/Smith/Buchanan PV Ss 20" 60 Cht 13 3/8" Rig: Total Charges: Daily Charges: 12 1/4" 160' 2922' Lithology (%) Sh Clyst Cly 40 Customer: Well: Avg MWD Summary Depth 5515' to 7680' ENI Petroleum Chlorides Gamma, Resistivitey, PWD SI25-N2 Spy Island 24 hr Max North Slope Doyon 15 AK-AM-0009649170 Job No.: 12 3-Aug-2012 24:00 Time: Report #: Date: 15.0 34 0.969 12 Size Make (current) 68.0 YP 3 9.45 (lb/100ft 2) 4865' 2805' 55 Condition 7416' LSND Depth Mud Type mg/l Coal Gvl API FL 4.7 Cor Solids ml/30min RPM ECD (ppg) Avg 1,300 Depth in / out Tools Min Max *10000 units = 100% Gas In Air 0 1159 Connection 0 618 N/A C-5n Zach Beekman C-3 312 encounter hard spots during drilling with slow ROP. Max gas observed during the last 24 hrs. was 2294 units during the N Sand Logging Engineers: Zach Beekman / Christina Medlyn (max) (current) Report By: (max) 19807 16 217426 Chromatograph (ppm) 156 124 1016 Minimum C-4i 7064' C-5i C-1 1784 C-4n 001005 5610'0 2789 Continued drilling ahead F/5,515' MD to 7,680' MD with a WOB 2-10, RPM 120-180, GPM 800-900, 1,500 psi. Still C-2 248 md. Average Gas Summary Units* Depth 52 98 234 181 0 Maximum 907-685-0772 Unit Phone: N/A 24 hr Recap: 75 Trip at a depth of 7064' MD. 2294 Background . . Density (ppg) Viscosity out (sec/qt) Max ml/30min RPM ECD (ppg) Avg 1,000 Depth in / out Tools Min mg/l Coal Gvl API FL 5.2 Cor Solids LSND Depth Mud Type Condition YP 3 9.45 (lb/100ft 2) 4865' 7930' 3055' 48 Make (current) 68.0 15.0 26 0.969 10 Size 13 4-Aug-2012 24:00 Time: Report #: Date: ENI Petroleum Chlorides Gamma, Resistivitey, PWD SI25-N2 Spy Island 24 hr Max North Slope Doyon 15 AK-AM-0009649170 Job No.: Customer: Well: Avg MWD Summary Depth 7680' to 7930' Sh Clyst Cly Rig: Total Charges: Daily Charges: 12 1/4" 160' 2922' Ss 20" 100 Cht 13 3/8" Lithology (%) 6.5 BROOH Rig Activity: Flow In (spm) 450.0 $3,410.00 7852' Ross/Smith/Buchanan PV WOB Weight 7680' 7930' 250' Current Pump & Flow Data: Current Depth: 24 Hour Progress: $36,910.00 Report For: MBT 29.3 (ppb Eq) Hycalog SKHI716-E4C Mud Data 7930' Yesterday's Depth: Flow In (gpm) Hours 888 SPP (psi) 9.70 EVAMAR 1245 % ROP (ft/hr) Bit Type TFA pH BTC 96% 211 Gallons/stroke Lst @4.23 Tuff Footage Silt Siltst Max @ ft Grade Area: Location: L-80 ROP Set At Size 178.9 X-65 Bit # Current in cP Casing Summary *10000 units = 100% Gas In Air 24 hours was 2765 units at a depth of 7848' MD. 2765 Background 907-685-0772 Unit Phone: N/A 24 hr Recap: 10 Trip Maximum 470 209 229 399 456 Depth Units* Gas Summary C-2 517 md. Average Continued drilling ahead from 7680' MD to TD at 7930' MD. Circulate one bottoms up for first five stands per K&M. 291 2905 208 175 15474 7689' 7848' C-5i C-1 2626 C-4n 415 1994 Minimum C-4i 205092 Chromatograph (ppm) 555 (max) 32259 186 Logging Engineers: Zach Beekman / Christina Medlyn (max) (current) Report By: Continue back reaming out of hole to 2904' MD at 140 rpm, 900 gpm, 1750 psi as of midnight. Max gas observed during the last N/A C-5n Zach Beekman C-3 845 127 2466 Connection 225 1529 . . Density (ppg) Viscosity out (sec/qt) ROP Set At Size 178.9 X-65 Bit # Current in cP Area: Location: L-80 Max @ ft 15.0 Grade Silt Siltst @4.23 Tuff Footage BTC 96% Gallons/stroke Lst ROP (ft/hr) Bit Type TFA pH EVAMAR % Yesterday's Depth: Flow In (gpm) Hours SPP (psi) 9.80 MBT (ppb Eq) Hycalog SKHI716-E4C Mud Data 7930' PV WOB Weight 7930' 7930' 0' Current Pump & Flow Data: Current Depth: 24 Hour Progress: $40,320.00 RIH w/ 9 5/8" Csg Rig Activity: Flow In (spm) $3,410.00 Ross/Smith/Buchanan Report For: Cht 13 3/8" Lithology (%) 5.5 Casing Summary Daily Charges: 12 1/4" 160' 2922' Ss 20" Sh Clyst Cly Customer: Well: Avg MWD Summary Depth 7930' to 7930' Rig: Total Charges: ENI Petroleum Chlorides Gamma, Resistivitey, PWD SI25-N2 Spy Island 24 hr Max North Slope Doyon 15 AK-AM-0009649170 Job No.: 14 5-Aug-2012 24:00 Time: Report #: Date: 35.00 15.0 25 0.969 11 Size Make (current) 68.0 YP 3 9.40 (lb/100ft 2) 4865' 7930' 3065' 50 Condition 140.0 LSND Depth Mud Type mg/l Coal Gvl API FL 5.0 0-1-CT-S-X-I-NO-TD Cor Solids ml/30min RPM ECD (ppg) Avg 900 Depth in / out Tools Min Max *10000 units = 100% Gas In Air Connection 0 0 N/A C-5n Zach Beekman C-3 0 0 0 Logging Engineers: Zach Beekman / Christina Medlyn (max) (current) Report By: on elevators. Lay down BHA #4. Prep and change out rams to 9 5/8" and test. Rig up 9 5/8" casing equipment. Run in hole without (max) 0 Chromatograph (ppm) 0 0 Minimum C-4i 0 C-5i C-1 0 C-4n 000 0 0 Continue to back ream out of the hole from 2904' MD to 1000' MD. Circulate 3 bottoms up. Continue to pull out of hole C-2 md. Average Gas Summary Depth Units* 00000 0 Maximum 907-685-0772 Unit Phone: N/A 24 hr Recap: Trip filling casing to 3404' MD as of midnight. Background . . Density (ppg) Viscosity out (sec/qt) Max ml/30min RPM ECD (ppg) Avg 900 Depth in / out Tools Min mg/l Coal Gvl API FL 4.8 0-1-CT-S-X-I-NO-TD Cor Solids LSND Depth Mud Type Condition 140.0 YP 3 9.40 (lb/100ft 2) 4865' 7930' 3065' 54 Make (current) 68.0 19 0.969 13 Size 15 6-Aug-2012 24:00 Time: Report #: Date: ENI Petroleum Chlorides Gamma, Resistivitey, PWD SI25-N2 Spy Island 24 hr Max North Slope Doyon 15 AK-AM-0009649170 Job No.: Customer: Well: Avg MWD Summary Depth 7930' to 7930' Rig: Total Charges: Sh Clyst Cly 12 1/4" 160' 2922' Ss 20" Cht 13 3/8" Lithology (%) 5.5 Casing Summary 35.00 Rig Activity: Flow In (spm) $3,410.00 Ross/Smith/Buchanan Report For: Daily Charges: WOB Weight 7930' 7930' 0' Current Pump & Flow Data: Current Depth: 24 Hour Progress: $43,730.00 Circulate & Condition Mud (ppb Eq) Hycalog SKHI716-E4C Mud Data 7930' PV 18.5 Yesterday's Depth: Flow In (gpm) Hours SPP (psi) 9.40 EVAMAR % MBT ROP (ft/hr) Bit Type TFA pH BTC 96% Gallons/stroke Lst @4.23 Tuff Footage Silt Siltst 15.0 Grade Area: Location: L-80 Max @ ft ROP Set At Size 178.9 X-65 Bit # Current in cP *10000 units = 100% Gas In Air condition the mud as of midnight. per plan to about 300 bbls, 150 bbls, and 100 bbls. Finish filling pipe. Break circulation at .5 bpm and staged up to 6.5 bpm and Background 907-685-0772 Unit Phone: N/A 24 hr Recap: Trip Maximum 00000 0 Depth Units* Gas Summary md. Average Continue running in hole with 9 5/8" casing. Began rotating from 4964' MD to 7920' MD. Rig down casing equipment. 0 0 000 C-4n C-2 Minimum C-4i 0 C-5i Chromatograph (ppm) 0 0 C-1 0 0 (max) (current) Report By: Rig up cement head with bleeder open to choke "poor boy" to releive trapped air from pipe. Hold prejob on filling the pipe. Fill pipe (max) Zach Beekman C-3 0 0 0 Logging Engineers: Zach Beekman / Christina Medlyn Connection 0 0 N/A C-5n . . Density (ppg) Viscosity out (sec/qt) ROP Set AtSize 178.9 X-65 Bit # Current in cP Area: Location: L-80 Max @ ft Grade Silt Siltst 4.23 Tuff Hydril 563 Footage BTC 96% Gallons/stroke Lst @ ROP (ft/hr) Bit Type TFA pH % MBT Flow In (gpm) Hours SPP (psi) 9.40 EVAMAR (ppb Eq) Mud Data 7930' PV 17.0 Weight 7930' 7930' 0' Current Pump & Flow Data: Current Depth: 24 Hour Progress: $47,140.00 Test BOPs Yesterday's Depth: Rig Activity: Flow In (spm) $3,410.00 Ross/Smith/BuchananReport For: Daily Charges: 7910' Cht 13 3/8" Lithology (%) 5.5 Casing Summary WOB 160' 2922' 9 5/8" Ss 20" ShClystCly Customer: Well: Avg MWD Summary Depth 7930' to 7930' Rig: Total Charges: ENI Petroleum Chlorides SI25-N2 Spy Island 24 hr Max North Slope Doyon 15 AK-AM-0009649170Job No.: 16 7-Aug-2012 24:00Time: Report #: Date: 1813 Size Make (current) 68.0 40.0 YP 9.40 (lb/100ft2) L-80 50 Condition LSND Depth Mud Type mg/l Coal Gvl API FL 5.2 Cor Solids ml/30min RPM ECD (ppg) Avg 900 Depth in / out Tools Min Max * 10000 units = 100% Gas In Air Connection 0 0 C-5n Emil Opitz C-3 0 0 0 Logging Engineers:Emil Opitz / Christina Medlyn (max)(current) Report By: emergency slip, and cut casing. N/U BOP. Freeze protect. C/O RAMS. Test BOP per AOGCC requirements. (max) 0 Chromatograph (ppm) 0 0 C-1 0 Minimum C-4i 0 C-5iC-4nC-2 000 0 md Average Circulate and condition mud for cement job. Cement as per well plan. Perform injectivity test. N/D BOP, set 0 Gas Summary DepthUnits* 0 00000 Maximum 907-685-0772Unit Phone: 24 hr Recap: TripBackground . . Density (ppg) Viscosity out (sec/qt) Max ml/30min RPM ECD (ppg) Avg 900 Depth in / out Tools Min mg/l Coal Gvl API FL 5.2 Cor Solids LSND Depth Mud Type Condition YP 4 9.30 (lb/100ft2) L-80 7930' 44 (current) 68.0 40.0 0.778 13 Size 17 8-Aug-2012 24:00Time: Report #: Date: ENI Petroleum Chlorides Xceed 675, EcoScope 675, TeleScope 675, sonicVision675 SI25-N2 Spy Island 24 hr Max North Slope Doyon 15 AK-AM-0009649170Job No.: Customer: Well: Avg MWD Summary Depth 7930' to 7930' Rig: Total Charges: ShClystCly 8.75 160' 2922' 9 5/8" Ss 20" 7910' Cht 13 3/8" Lithology (%) 5.5 Casing Summary WOB $3,410.00 Ross/Wimmer/BuchananReport For: Daily Charges: 7930' 7930' 0' Current Pump & Flow Data: Current Depth: 24 Hour Progress: $50,550.00 RIH w/ BHA #5 Yesterday's Depth: Rig Activity: (ppb Eq) Smith MDSi616 EBPX Mud Data 7930' PV 17.0 Flow In (spm) Flow In (gpm) Hours SPP (psi) 9.30 TFA pH % MBT @ ROP (ft/hr) Bit Type 96% Gallons/stroke Lst EVAMAR Weight 15 Make 4.23 Tuff Hydril 563 Footage BTC Silt Siltst Grade Area: Location: L-80 Max @ ft ROP Set AtSize 178.9 X-65 Bit # Current in cP * 10000 units = 100% Gas In Air Background 907-685-0772Unit Phone: 24 hr Recap: Trip Maximum 00000 0 DepthUnits* 0 Gas Summary md Average Finish BOP testing. P/U and RIH w/ 5" DP joints. Slip and cut drill line. Finish RIH with 5", and POOH, installing WEI 0 000 C-4nC-2 Minimum C-4i 0 C-5i Chromatograph (ppm) 0 0 C-1 0 0 (max)(current) Report By: subs and racking back stands. Test casing to 2000 psi for 10 min - OK. P/U BHA #5 and begin to RIH. (max) Emil Opitz C-3 0 0 0 Logging Engineers:Emil Opitz / Christina Medlyn Connection 0 0 C-5n . . Density (ppg) Viscosity out (sec/qt) 20" 13 3/8" 9 5/8" BTC L-80 Grade L-80 40.0 ROP Set AtSize 178.9 X-65 Bit # Area: Location: 96% 461 99 SPP (psi) Gallons/stroke 1533 @ Yesterday's Depth: Rig: Job No.: ROP (ft/hr) Condition in Mud Data Depth in / out % Casing Summary RPM HoursBit Type TFA Cly Current Pump & Flow Data: Max @ ft Current 4.23 Flow In (spm) MWD Summary Total Charges: 7930' 7930' 0' Current Depth: 24 Hour Progress: Drill out cementRig Activity: Doyon 15 Daily Charges:$3,410.00 8.4 Alkal Lime $53,960.00 Report For: Ratio cP Ross/Wimmer/Buchanan Flow In (gpm) TuffGvlCoal 68.0 Weight Size Smith MDSi616 EBPX 160' 2922' 7910' Lithology (%) (current) ShClyst Footage ENI Petroleum SI25-N2 Spy Island 24 hr Max North Slope Customer: Well: Avg 0.778 1147 8 3/4" PVOil / Water 7930' WOB 18 9-Aug-2012 24:00:00Time: Report #: Date: AK-AM-0009649170 65/35 14 Ss - Lst EVAMAR Make 9.25 4 Cht Silt Siltst HYDRIL YP Cor Solids (lb/100ft2) 3.252.50 Mud (lb/bbl)ml/30min 7930' FazePro Depth Mud Type Depth 7930'to7930' Avg Min MaxECD (ppg) Tools Xceed675, EcoScope675, TeleScope675, sonicVision675 API FL * 10000 units = 100% Gas In Air Logging Engineers:Emil Opitz / Christina Medlyn (max)(current) C-5i 907-685-0772Unit Phone: 0 Emil OpitzReport By: C-1 0Maximum0 0 Depth C-2 C-3 0Minimum Average 000 0 00 Units* and condition 9.2 ppg LSND in preparation for casing test. Perform casing test to 3000 psi for 30 min - OK. Test WEI manifold to P/U BHA #5 and RIH. Shallow test MWD - OK. CBL from 2890' to 7748' MD. Tag float collar @ 7828' MD. Circulate md 3000 & 5000 psi - OK. Displace LSND to 9.3 ppg FazePro OBM. 00 Gas Summary C-5n 00 C-4i C-4n 0 0 0 0 0 0 Trip 24 hr Recap: Background Connection(max) Chromatograph (ppm) . . Density (ppg) Viscosity out (sec/qt) ECD (ppg) Tools Xceed675, EcoScope675, TeleScope675, sonicVision675 API FL Depth 9709'to7930' 11.15 Avg Min Max 9558' FazePro Depth Mud Type YP Cor Solids (lb/100ft2) 3.642.80 Mud (lb/bbl)ml/30min 4 Cht Silt Siltst 100 HYDRIL Ss 5.0 Lst EVAMAR Make 9.30 9.30 65/35 20 7930' WOB 19 10-Aug-2012 24:00:00Time: Report #: Date: AK-AM-0009649170 Customer: Well: Avg 0.778 1649 8 3/4" PVOil / Water Footage ENI Petroleum SI25-N2 Spy Island 24 hr Max North Slope 615.4 Lithology (%) (current) ShClyst 68.0 Weight Size Smith MDSi616 EBPX 160' 2922' 7910' TuffGvlCoal $3,410.00 9.4 Alkal Lime $57,370.00 Report For: Ratio cP Ross/Wimmer/Buchanan Flow In (gpm) Total Charges: 7930' 9709' 1779' Current Depth: 24 Hour Progress: Drilling AheadRig Activity: Doyon 15 Daily Charges: Current Pump & Flow Data: Max @ ft Current 8400'247.3 4.23 Flow In (spm) MWD Summary Bit Type TFA Cly RPM Hours Depth in / out % Casing Summary Condition in Mud Data @ Yesterday's Depth: 50.0 Rig: Job No.: ROP (ft/hr) Area: Location: 96% 550 130 SPP (psi) Gallons/stroke 2052 ROP Set AtSize 178.9 X-65 Bit # L-80 Grade L-80 40.0 20" 13 3/8" 9 5/8" BTC * 10000 units = 100% Gas In Air Connection(max) Chromatograph (ppm) 24 hr Recap: 133Background Trip 383 269 181 87 86 154 C-4i C-4n C-5n 3359 203300 634 Gas Summary md consist primarily of unconsolidated sands, with lesser amounts of siltstone. Drill 20' new hole to 7950' MD. Circulate and condition mud for FIT. Drill ahead in production section. Samples 790 Units* 44 9270'1911 8812' 131 271 6559Minimum Average 4662605 41 Depth C-2 C-3 2495 C-1 174Maximum315 907-685-0772Unit Phone: 95 Emil OpitzReport By:Logging Engineers:Emil Opitz / Christina Medlyn (max)(current) C-5i . . Density (ppg) Viscosity out (sec/qt) 20" 13 3/8" 9 5/8" BTC L-80 Grade L-80 40.0 ROP Set AtSize 178.9 X-65 Bit # Area: Location: 96% SPP (psi) Gallons/stroke @ Yesterday's Depth: Rig: Job No.: ROP (ft/hr) Condition in Mud Data Depth in / out % Casing Summary RPM HoursBit Type TFA Cly Current Pump & Flow Data: Max @ ft Current 9802'188.0 4.23 Flow In (spm) MWD Summary Total Charges: 9709' 9861' 152' Current Depth: 24 Hour Progress: L/D BHA #5Rig Activity: Doyon 15 Daily Charges:$3,410.00 10.3 Alkal Lime $60,780.00 Report For: Ratio cP Ross/Wimmer/Buchanan Flow In (gpm) TuffGvlCoal 68.0 Weight Size Smith MDSi616 EBPX 160' 2922' 7910' Lithology (%) (current) ShClyst Footage ENI Petroleum SI25-N2 Spy Island 24 hr Max North Slope 254.7 Customer: Well: Avg 0.778 1446 8 3/4" 1931' PVOil / Water 7930' 9861' WOB 20 11-Aug-2012 24:00:00Time: Report #: Date: AK-AM-0009649170 9.30 12.70 67/33 14 Ss 4.8 Lst EVAMAR Make 9.30 180.04 Cht Silt Siltst 100 HYDRIL YP 1-1-WT-A-X-I-N-DTF Cor Solids (lb/100ft2) 3.582.75 Mud (lb/bbl)ml/30min 9860' FazePro Depth Mud Type Depth 9861'to9709' Avg Min MaxECD (ppg) Tools Xceed675, EcoScope675, TeleScope675, sonicVision675 API FL 6.0 * 10000 units = 100% Gas In Air Logging Engineers:Emil Opitz / Christina Medlyn (max)(current) C-5i 907-685-0772Unit Phone: 80 Emil OpitzReport By: C-1 140Maximum219 31 Depth C-2 C-3 1669Minimum Average 5631626103 181 62469712' 730 Units* 44 9835' Samples consist primarily of unconsolidated sands. Drill ahead to 9860' MD. Troubleshoot Xceed tool. POOH due to Xceed tool failure. BROOH per K&M. L/D BHA #5. 451 md 81796 393 Gas Summary C-5n 4881 C-4i C-4n 168 117 97 90 134 237 Trip 74 24 hr Recap: Background Connection(max) Chromatograph (ppm) . . Density (ppg) Viscosity out (sec/qt) 20" 13 3/8" 9 5/8" BTC L-80 Grade L-80 40.0 ROP Set AtSize 178.9 X-65 Bit # Area: Location: 96% SPP (psi) Gallons/stroke @ Yesterday's Depth: Rig: Job No.: ROP (ft/hr) Condition in Mud Data Depth in / out % Casing Summary RPM HoursBit Type TFA Cly Current Pump & Flow Data: Max @ ft Current 4.23 Flow In (spm) MWD Summary Total Charges: 9860' 9860' 0' Current Depth: 24 Hour Progress: Repair Top DriveRig Activity: Doyon 15 Daily Charges:$3,410.00 10.3 Alkal Lime $64,190.00 Report For: Ratio cP Ross/Wimmer/Buchanan Flow In (gpm) TuffGvlCoal 68.0 Weight Size Smith MDSi616 EBPX 160' 2922' 7910' Lithology (%) (current) ShClyst Footage ENI Petroleum SI25-N2 Spy Island 24 hr Max North Slope Customer: Well: Avg 0.778 1346 8 3/4" 1931' PVOil / Water 7930' 9861' WOB 21 12-Aug-2012 24:00:00Time: Report #: Date: AK-AM-0009649170 9.30 12.70 67/33 15 Ss 4.8 Lst EVAMAR Make 9.30 180.04 Cht Silt Siltst HYDRIL YP 1-1-WT-A-X-I-N-DTF Cor Solids (lb/100ft2) 3.973.05 Mud (lb/bbl)ml/30min 9860' FazePro Depth Mud Type Depth 9860'to9860' Avg Min MaxECD (ppg) Tools API FL 6.0 * 10000 units = 100% Gas In Air Logging Engineers:Emil Opitz / Christina Medlyn (max)(current) C-5i 907-685-0772Unit Phone: 0 Emil OpitzReport By: C-1 0Maximum0 0 Depth C-2 C-3 0Minimum Average 000 0 00 Units* Finish L/D BHA #5. Top Drive began leaking oil. Repair Top Drive and conduct rig maintenance. md 00 Gas Summary C-5n 00 C-4i C-4n 0 0 0 0 0 0 Trip 24 hr Recap: Background Connection(max) Chromatograph (ppm) . . Density (ppg) Viscosity out (sec/qt) ECD (ppg) Tools API FL Depth 9860'to9860' Avg Min Max 9860' FazePro Depth Mud Type YP Cor Solids (lb/100ft2) 3.582.75 Mud (lb/bbl)ml/30min Cht Silt Siltst HYDRIL Ss - Lst EVAMAR Make 9.30 9.30 67/33 15 WOB 22 13-Aug-2012 24:00:00Time: Report #: Date: AK-AM-0009649170 Customer: Well: Avg 1346 PVOil / Water Footage ENI Petroleum SI25-N2 Spy Island 24 hr Max North Slope Lithology (%) (current) ShClyst 68.0 Weight Size 160' 2922' 7910' TuffGvlCoal $3,410.00 10.3 Alkal Lime $67,600.00 Report For: Ratio cP Ross/Wimmer/Buchanan Flow In (gpm) Total Charges: 9860' 9860' 0' Current Depth: 24 Hour Progress: RIH w/ BHA #6Rig Activity: Doyon 15 Daily Charges: Current Pump & Flow Data: Max @ ft Current 4.23 Flow In (spm) MWD Summary Bit Type TFA Cly RPM Hours Depth in / out % Casing Summary Condition in Mud Data @ Yesterday's Depth: Rig: Job No.: ROP (ft/hr) Area: Location: 96% SPP (psi) Gallons/stroke ROP Set AtSize 178.9 X-65 Bit # L-80 Grade L-80 40.0 20" 13 3/8" 9 5/8" BTC * 10000 units = 100% Gas In Air Connection(max) Chromatograph (ppm) 24 hr Recap: Background Trip 0 0 0 0 0 0 C-4i C-4n C-5n 00 00 Gas Summary md Finish repairing seal on Top Drive. Finish rig maintenance. Begin to pick up BHA #6. Units* 0 0 00Minimum Average 00 0 Depth C-2 C-3 0 C-1 0Maximum0 907-685-0772Unit Phone: 0 Emil OpitzReport By:Logging Engineers:Emil Opitz / Christina Medlyn (max)(current) C-5i . . Density (ppg) Viscosity out (sec/qt) 20" 13 3/8" 9 5/8" BTC L-80 Grade L-80 40.0 ROP Set AtSize 178.9 X-65 Bit # Area: Location: 96% 550 130 SPP (psi) Gallons/stroke 2325 @ Yesterday's Depth: 288.6 Rig: Job No.: ROP (ft/hr) Condition in Mud Data Depth in / out % Casing Summary RPM HoursBit Type TFA Cly Current Pump & Flow Data: Max @ ft Current 9987'249.4 4.23 Flow In (spm) MWD Summary Total Charges: 9860' 10993' 1133' Current Depth: 24 Hour Progress: Drilling AheadRig Activity: Doyon 15 Daily Charges:$7,710.00 11.4 Alkal Lime $75,310.00 Report For: Ratio cP Ross/Wimmer/Buchanan Flow In (gpm) TuffGvlCoal 68.0 Weight Size Smith MDSi616 BPX 160' 2922' 7910' Lithology (%) (current) ShClyst Footage ENI Petroleum SI25-N2 Spy Island 24 hr Max North Slope 518.2 Customer: Well: Avg 0.902 1448 8.75" PVOil / Water 9860' WOB 23 14-Aug-2012 24:00:00Time: Report #: Date: AK-AM-0009649170 67/33 17 Ss 4.2 Lst EVAMAR Make 9.40 5 Cht Silt Siltst 100 HYDRIL YP Cor Solids (lb/100ft2) 3.903.00 Mud (lb/bbl)ml/30min 9860' FazePro Depth Mud Type Depth 10993'to9860' 11.1810.5610.99 Avg Min MaxECD (ppg) Tools PowerDrive X5, EcoScope675, TeleScope675 API FL * 10000 units = 100% Gas In Air Logging Engineers:Emil Opitz / Christina Medlyn (max)(current) C-5i 907-685-0772Unit Phone: 48 Emil OpitzReport By: C-1 94Maximum205 52 Depth C-2 C-3 5849Minimum Average 4273377120 185 323910137' 1483 Units* 97 9993' Drill ahead. Samples consist primarily of unconsolidated sand, with lesser amounts of siltstone. RIH w/ BHA #6, shallow test MWD - OK. RIH circulating every 20 stands to condition mud. Wash down from 9392' MD. 812 md NOTE: Pricing updated to reflect crew changeouts during this well. 166344 606 Gas Summary C-5n 1123 C-4i C-4n 294 162 78 40 144 295 Trip 24 hr Recap: 85Background Connection(max) Chromatograph (ppm) . . Density (ppg) Viscosity out (sec/qt) 20" 13 3/8" 9 5/8" BTC L-80 Grade L-80 40.0 ROP Set AtSize 178.9 X-65 Bit # Area: Location: 96% 533 126 SPP (psi) Gallons/stroke 2391 @ Yesterday's Depth: 138.5 Rig: Job No.: ROP (ft/hr) Condition in Mud Data Depth in / out % Casing Summary RPM HoursBit Type TFA Cly Current Pump & Flow Data: Max @ ft Current 262.8 4.23 Flow In (spm) MWD Summary Total Charges: 10993' 12873' 1880' Current Depth: 24 Hour Progress: Drilling AheadRig Activity: Doyon 15 Daily Charges:$3,410.00 11.7 Alkal Lime $78,720.00 Report For: Ratio cP Keener/Wimmer/Buchanan Flow In (gpm) TuffGvlCoal 68.0 Weight Size Smith MDSi616 BPX 160' 2922' 7910' Lithology (%) (current) ShClyst Footage ENI Petroleum SI25-N2 Spy Island 24 hr Max North Slope 475.9 Customer: Well: Avg 0.902 1347 8.75" PVOil / Water 9860' WOB 24 15-Aug-2012 24:00:00Time: Report #: Date: AK-AM-0009649170 68/32 22 Ss 4.6 Lst EVAMAR Make 9.40 5 10 Cht Silt Siltst 90 HYDRIL YP Cor Solids (lb/100ft2) 3.512.70 Mud (lb/bbl)ml/30min 9860' FazePro Depth Mud Type Depth 12873'to10993' 11.6410.8611.42 Avg Min MaxECD (ppg) Tools PowerDrive X5, EcoScope675, TeleScope675 API FL * 10000 units = 100% Gas In Air Logging Engineers:Emil Opitz / Christina Medlyn (max)(current) C-5i 907-685-0772Unit Phone: 87 Emil OpitzReport By: C-1 159Maximum282 17 Depth C-2 C-3 678Minimum Average 7036331160 232 393112847' 1322 Units* 40 11051' siltstone. Continue drilling ahead in production section. Cuttings primarily consist of sandstone, with lesser amounts of 467 md 143212 570 Gas Summary C-5n 3759 C-4i C-4n 311 221 124 58 192 317 Trip 24 hr Recap: 41Background Connection(max) Chromatograph (ppm) . . Density (ppg) Viscosity out (sec/qt) ECD (ppg) Tools PowerDrive X5, EcoScope675, TeleScope675 API FL Depth 13882'to12873' 11.8211.3911.61 Avg Min Max 13882' FazePro Depth Mud Type YP Cor Solids (lb/100ft2) 3.252.50 Mud (lb/bbl)ml/30min 5 Cht Silt Siltst 100 HYDRIL Ss 4.4 Lst EVAMAR Make 9.40 67/33 18 9860' WOB 25 16-Aug-2012 24:00:00Time: Report #: Date: AK-AM-0009649170 Customer: Well: Avg 0.902 1548 8.75" PVOil / Water Footage ENI Petroleum SI25-N2 Spy Island 24 hr Max North Slope 466.7 Lithology (%) (current) ShClyst 68.0 Weight Size Smith MDSi616 BPX 160' 2922' 7910' TuffGvlCoal $3,410.00 11.9 Alkal Lime $82,130.00 Report For: Ratio cP Keener/Wimmer/Buchanan Flow In (gpm) Total Charges: 12873' 13882' 1009' Current Depth: 24 Hour Progress: BROOHRig Activity: Doyon 15 Daily Charges: Current Pump & Flow Data: Max @ ft Current 13496'238.4 4.23 Flow In (spm) MWD Summary Bit Type TFA Cly RPM Hours Depth in / out % Casing Summary Condition in Mud Data @ Yesterday's Depth: Rig: Job No.: ROP (ft/hr) Area: Location: 96% 547 130 SPP (psi) Gallons/stroke 2495 ROP Set AtSize 178.9 X-65 Bit # L-80 Grade L-80 40.0 20" 13 3/8" 9 5/8" BTC * 10000 units = 100% Gas In Air Connection(max) Chromatograph (ppm) 41 24 hr Recap: 24Background Trip 570 323 229 100 88 163 C-4i C-4n C-5n 4067 94367 884 Gas Summary md siltstones. 13027' MD. Cuttings primarily consisted of unconsolidated sands, with lesser amounts of calcareously cemented sandstone and Continue drilling ahead in production section to FTD of 13882' MD. Monitor well - static. BROOH per K&M, currently at 404 Units* 46 13645'881 13797' 143 317 6870Minimum Average 5633265 43 Depth C-2 C-3 1122 C-1 174Maximum339 907-685-0772Unit Phone: 93 Emil OpitzReport By:Logging Engineers:Emil Opitz / Leigh Ann Rasher (max)(current) C-5i . . Density (ppg) Viscosity out (sec/qt) 20" 13 3/8" 9 5/8" BTC L-80 Grade L-80 40.0 ROP Set AtSize 178.9 X-65 Bit # Area: Location: 96% 550 130 SPP (psi) Gallons/stroke 1414 @ Yesterday's Depth: Rig: Job No.: ROP (ft/hr) Condition in Mud Data Depth in / out % Casing Summary RPM HoursBit Type TFA Cly Current Pump & Flow Data: Max @ ft Current 4.23 Flow In (spm) MWD Summary Total Charges: 13882' 13882' 0' Current Depth: 24 Hour Progress: BROOHRig Activity: Doyon 15 Daily Charges:$3,410.00 11.8 Alkal Lime $85,540.00 Report For: Ratio cP Keener/Wimmer/Buchanan Flow In (gpm) TuffGvlCoal 68.0 Weight Size Smith MDSi616 BPX 160' 2922' 7910' Lithology (%) (current) ShClyst Footage ENI Petroleum SI25-N2 Spy Island 24 hr Max North Slope Customer: Well: Avg 0.902 1346 8.75" PVOil / Water 9860' WOB 26 17-Aug-2012 24:00:00Time: Report #: Date: AK-AM-0009649170 67/33 15 Ss 4.2 Lst EVAMAR Make 9.40 5 Cht Silt Siltst HYDRIL YP Cor Solids (lb/100ft2) 2.862.20 Mud (lb/bbl)ml/30min 13882' FazePro Depth Mud Type Depth 13882'to13882' Avg Min MaxECD (ppg) Tools PowerDrive X5, EcoScope675, TeleScope675 API FL * 10000 units = 100% Gas In Air Logging Engineers:Emil Opitz / Leigh Ann Rasher (max)(current) C-5i 907-685-0772Unit Phone: 0 Emil OpitzReport By: C-1 0Maximum0 0 Depth C-2 C-3 0Minimum Average 000 0 00 Units* BROOH per K&M. md 00 Gas Summary C-5n 00 C-4i C-4n 0 0 0 0 0 0 Trip 24 hr Recap: 18Background Connection(max) Chromatograph (ppm) . . Density (ppg) Viscosity out (sec/qt) ECD (ppg) Tools API FL 10.0 Depth 13882'to13882' Avg Min Max 13882' FazePro Depth Mud Type YP 1-1-CT-A-X-IN-NO-TD Cor Solids (lb/100ft2)Mud (lb/bbl)ml/30min 5 Cht Silt Siltst HYDRIL Ss Lst EVAMAR Make 9.40 120.026.50 9860' 13882' WOB 27 18-Aug-2012 24:00:00Time: Report #: Date: AK-AM-0009649170 Customer: Well: Avg 0.9028.75" 4021' PVOil / Water Footage ENI Petroleum SI25-N2 Spy Island 24 hr Max North Slope Lithology (%) (current) ShClyst 68.0 Weight Size Smith MDSi616 BPX 160' 2922' 7910' TuffGvlCoal $3,410.00 Alkal Lime $88,950.00 Report For: Ratio cP Keener/Wimmer/Buchanan Flow In (gpm) Total Charges: 13882' 13882' 0' Current Depth: 24 Hour Progress: Circulate and ConditionRig Activity: Doyon 15 Daily Charges: Current Pump & Flow Data: Max @ ft Current 4.23 Flow In (spm) MWD Summary Bit Type TFA Cly RPM Hours Depth in / out % Casing Summary Condition in Mud Data @ Yesterday's Depth: Rig: Job No.: ROP (ft/hr) Area: Location: 96% 470 111 SPP (psi) Gallons/stroke 1615 ROP Set AtSize 178.9 X-65 Bit # L-80 Grade L-80 40.0 20" 13 3/8" 9 5/8" BTC * 10000 units = 100% Gas In Air Connection(max) Chromatograph (ppm) 155 24 hr Recap: 16Background Trip 0 0 0 0 0 0 C-4i C-4n C-5n 00 00 Gas Summary md Units* 0 0 00Minimum Average 00 0 Depth C-2 C-3 0 C-1 0Maximum0 907-685-0772Unit Phone: 0 Emil OpitzReport By:Logging Engineers:Emil Opitz / Leigh Ann Rasher (max)(current) C-5i . . Density (ppg) Viscosity out (sec/qt) 20" 13 3/8" 9 5/8" BTC L-80 Grade L-80 40.0 ROP Set AtSize 178.9 X-65 Bit # Area: Location: 96% SPP (psi) Gallons/stroke @ Yesterday's Depth: Rig: Job No.: ROP (ft/hr) Condition in Mud Data Depth in / out % Casing Summary RPM HoursBit Type TFA Cly Current Pump & Flow Data: Max @ ft Current 4.23 Flow In (spm) MWD Summary Total Charges: 13882' 13882' 0' Current Depth: 24 Hour Progress: R/U for 4.5" linerRig Activity: Doyon 15 Daily Charges:$5,721.00 11.4 Alkal Lime $94,671.00 Report For: Ratio cP Keener/Wimmer/Buchanan Flow In (gpm) TuffGvlCoal 68.0 Weight Size 160' 2922' 7910' Lithology (%) (current) ShClyst Footage ENI Petroleum SI25-N2 Spy Island 24 hr Max North Slope Customer: Well: Avg 1452 PVOil / Water WOB 28 19-Aug-2012 24:00:00Time: Report #: Date: AK-AM-0009649170 67/33 16 Ss - Lst EVAMAR Make 9.40 Cht Silt Siltst HYDRIL YP Cor Solids (lb/100ft2) 3.062.35 Mud (lb/bbl)ml/30min 13882' FazePro Depth Mud Type Depth 13882'to13882' Avg Min MaxECD (ppg) Tools API FL * 10000 units = 100% Gas In Air Logging Engineers:Emil Opitz / Leigh Ann Rasher (max)(current) C-5i 907-685-0772Unit Phone: 0 Emil OpitzReport By: C-1 0Maximum0 0 Depth C-2 C-3 0Minimum Average 000 0 00 Units* Circulate and condition mud pripr to spotting Fazeaway Breaker. Pump breaker. POOH. L/D BHA #7. md NOTE: Daily Cost dropped to $2810; sample catchers released. SI25-N2 well consumables added to todays daily cost; $2911.00. 00 Gas Summary C-5n 00 C-4i C-4n 0 0 0 0 0 0 Trip 71 24 hr Recap: Background Connection(max) Chromatograph (ppm) . . Density (ppg) Viscosity out (sec/qt) ECD (ppg) Tools API FL Depth 13882'to13882' Avg Min Max 13882' Brine Depth Mud Type YP Cor Solids (lb/100ft2)Mud (lb/bbl)ml/30min Cht Silt Siltst HYDRIL Ss Lst EVAMAR Make 9.15 WOB 29 20-Aug-2012 24:00:00Time: Report #: Date: AK-AM-0009649170 Customer: Well: Avg 28 PVOil / Water Footage ENI Petroleum SI25-N2 Spy Island 24 hr Max North Slope Lithology (%) (current) ShClyst 68.0 Weight Size 160' 2922' 7910' TuffGvlCoal $2,810.00 Alkal Lime $97,481.00 Report For: Ratio cP Keener/Wimmer/Buchanan Flow In (gpm) Total Charges: 13882' 13882' 0' Current Depth: 24 Hour Progress: L/D 5" DPRig Activity: Doyon 15 Daily Charges: Current Pump & Flow Data: Max @ ft Current 4.23 Flow In (spm) MWD Summary Bit Type TFA Cly RPM Hours Depth in / out % Casing Summary Condition in Mud Data @ Yesterday's Depth: Rig: Job No.: ROP (ft/hr) Area: Location: 96% SPP (psi) Gallons/stroke ROP Set AtSize 178.9 X-65 Bit # L-80 Grade L-80 40.0 20" 13 3/8" 9 5/8" BTC * 10000 units = 100% Gas In Air Connection(max) Chromatograph (ppm) 24 hr Recap: Background Trip 0 0 0 0 0 0 C-4i C-4n C-5n 00 00 Gas Summary md RIH w/ 4.5" liner to 6179' MD. M/U baker hanger. Set packer. Cut and slip drill line. L/D 5" DP. Units* 0 0 00Minimum Average 00 0 Depth C-2 C-3 0 C-1 0Maximum0 907-685-0772Unit Phone: 0 Emil OpitzReport By:Logging Engineers:Emil Opitz / Leigh Ann Rasher (max)(current) C-5i W E L L N A M E : SI 2 5 - N 2 LO C A T I O N : Spy Island OP E R A T O R : EN I P e t r o l e u m AR E A : North Slope MU D C O : MI S w a c o ST A T E : Alaska RI G : Do y o n 1 5 SP U D : 26-Jun-12 SP E R R Y J O B : AK - A M - 0 0 0 9 6 4 9 1 7 0 TD : 16-Aug-12 BI T R E C O R D MW D BH A # SD L RU N # Bi t # B i t T y p e B i t Si z e De p t h In ( f t ) De p t h Ou t ( f t ) Fo o t a g e B i t Ho u r s TF A A V G RO P WO B (m a x ) RP M (m a x ) SP P (m a x ) FL O W G P M (m a x ) Bi t G r a d e R e m a r k s 2 1 0 0 1 R R H u g h e s M X - 1 M i l l T o o t h 1 6 " 1 6 0 2 9 3 6 2 7 7 6 1 7 . 3 0 1 . 1 1 7 1 6 0 . 8 24 40 1 1 6 0 6 3 0 1- 1 - W T - A - E - I - N O - T D Surface TD 3 2 0 0 2 H y c a l o g S K H I 7 1 6 D - E 4 C P D C 1 2 . 2 5 " 2 9 3 6 4 8 6 5 1 9 2 9 2 1 . 5 0 0 . 9 6 9 8 9 . 6 12 14 0 1 5 0 0 9 0 0 1 - 2 - C T - S - X - I - N O - P R B i t T r i p 4 3 0 0 3 H y c a l o g S K H I 7 1 6 D - E 4 C P D C 1 2 . 2 5 " 4 8 6 5 7 9 3 0 3 0 6 5 3 5 . 0 0 0 . 9 6 9 8 7 . 7 15 14 0 2 0 0 0 9 0 0 0 - 1 - C T - S - X - I - N O - T D I n t e r m e d i a t e T D 5 4 0 0 4 S m i t h M D S i 6 1 6 EB P X P D C 8 . 7 5 " 79 3 0 9 8 6 1 1 9 3 1 1 2 . 7 0 0 . 7 7 8 1 5 1 . 8 6 18 0 2 1 8 0 5 5 0 1 - 1 - W T - A - X - I - N - D T F P O O H d u e t o S L B ' s X c e e d t o o l f a i l u r e 6 5 0 0 5 S m i t h M D S i 6 1 6 BP X P D C 8 . 7 5 98 6 1 1 3 8 8 2 4 0 2 1 2 6 . 5 0 0 . 9 0 2 15 2 . 0 10 1 2 0 2 7 0 0 5 5 0 1- 1 - C T - A - X - I N - N O - T D Production TD WE L L N A M E : L O C A T I O N : OP E R A T O R : A R E A : MU D C O : S T A T E : RI G : S P U D : SP E R R Y J O B : T D : Mu d R e c o r d W a t e r B a s e d M u d R e c o r d 16 0 ' t o 2 , 9 3 6 ' 2, 9 3 6 ' t o 7 , 9 3 0 ' Da t e D e p t h W t V i s P V Y P G e l s F i l t R6 0 0 / R 3 0 0 / R 2 0 0 / R 1 0 0 / R6 / R 3 Ca k e S o l i d s Oi l / W a t e r Sd P m p H M B T P f / M f C h l o r H a r d R e m a r k s ft - M D p p g s e c l b / 1 0 0 l b / 1 0 0 f t 2 m / 3 0 m R h e o m e t e r 3 2 n d s % v o l % v o l m g / l C a + + 25 - J u l 1 6 0 8 . 7 0 1 1 3 3 7 3 5 1 5 / 2 9 / 3 2 4 . 0 1 0 9 / 7 2 / 6 2 / 4 3 / 1 5 / 1 2 2 / - 4 . 0 1 / 9 5 - 0 . 1 3 9 . 4 2 1 . 3 . 0 5 / . 2 5 9 0 0 1 2 0 P / U B H A # 2 26 - J u l 1 3 3 2 9 . 2 0 8 0 2 3 3 1 2 4 / 4 7 / 5 3 4 . 8 7 7 / 5 4 / 4 5 / 3 4 / 1 8 / 1 6 2 / - 5 . 0 1 / 9 4 0 . 5 0 0 . 1 0 9 . 8 1 7 . 5 . 0 5 / . 2 0 2 6 0 0 8 0 D r i l l i n g A h e a d 27 - J u l 2 9 3 6 9 . 5 5 9 4 3 2 3 4 1 7 / 3 9 / 4 6 5 . 2 9 8 / 6 6 / 5 5 / 3 9 / 1 8 / 1 6 3 / - 8 . 0 2 / 9 0 0 . 4 0 0 . 0 8 9 . 4 2 1 . 3 . 0 5 / . 2 0 1 0 0 0 2 0 B R O O H 28 - J u l 2 9 3 6 9 . 4 5 7 9 2 3 3 2 1 4 / 2 8 / 3 9 6 . 0 7 8 / 5 5 / 4 2 / 2 9 / 1 3 / 1 1 2 / - 6 . 5 1 / 9 3 0 . 4 0 0 . 0 5 9 . 0 2 1 . 5 . 0 3 / . 1 0 1 0 0 0 3 0 C o n d i t i o n f o r c e m e n t 29 - J u l 2 9 3 6 9 . 4 0 5 3 1 6 1 6 4 / 4 / 6 6 . 0 4 8 / 3 2 / 2 0 / 1 5 / 5 / 4 2 / - 6 . 0 1 / 9 3 0 . 2 5 - 8 . 4 2 1 . 0 - / - 1 0 0 0 3 0 T e s t B O P 30 - J u l 2 9 5 5 9 . 2 0 4 6 9 1 9 8 / 9 / 1 1 6 . 8 3 7 / 2 8 / 2 5 / 2 0 / 9 / 7 1 / - 4 . 0 2 / 9 4 - 0 . 2 5 9 . 9 2 . 0 . 1 0 / . 7 0 6 0 0 3 0 R / D F I T t e s t e q u i p m e n t 31 - J u l 4 7 9 0 9 . 2 5 5 2 1 1 3 0 1 2 / 2 1 / 2 3 5 . 2 5 2 / 4 1 / 3 2 / 2 8 / 1 3 / 1 2 2 / - 5 . 0 2 / 9 3 t r 0 . 2 5 1 0 . 0 1 0 . 0 . 1 5 / . 7 0 1 3 0 0 4 0 D r i l l i n g A h e a d 1- A u g 4 8 6 4 9 . 2 5 4 9 1 0 2 7 1 1 / 1 8 / 2 0 5 . 6 4 7 / 3 7 / 3 2 / 2 5 / 1 2 / 1 0 2 / - 4 . 5 3 / 9 3 - 0 . 2 3 9 . 7 1 0 . 0 . 1 0 / . 6 5 9 0 0 4 0 R I H w / B H A # 4 2- A u g 5 5 1 5 9 . 2 5 5 1 1 1 2 9 1 1 / 1 7 / 1 8 5 . 6 5 1 / 4 0 / 3 6 / 2 8 / 1 2 / 1 1 2 / - 5 . 0 3 / 9 2 t r 0 . 1 8 9 . 8 1 0 . 0 . 0 8 / . 6 5 9 0 0 4 0 D r i l l i n g A h e a d 3- A u g 7 6 8 0 9 . 4 5 5 5 1 2 3 4 1 6 / 2 7 / 3 1 4 . 7 5 8 / 4 6 / 4 1 / 3 3 / 1 2 / 1 1 2 / - 6 . 0 3 / 9 1 0 . 2 5 0 . 1 5 9 . 7 1 5 . 0 . 0 5 / . 3 0 1 3 0 0 3 0 D r i l l i n g A h e a d 4- A u g 7 9 3 0 9 . 4 5 4 8 1 0 2 6 1 2 / 2 8 / 3 6 5 . 2 4 6 / 3 6 / 3 1 / 2 4 / 1 3 / 1 1 2 / - 6 . 5 3 / 9 1 t r 0 . 1 5 9 . 7 1 5 . 0 . 0 5 / . 3 0 1 0 0 0 3 0 B R O O H 5- A u g 7 9 3 0 9 . 4 0 5 0 1 1 2 5 1 1 / 2 3 / 2 6 5 . 0 4 7 / 3 6 / 3 1 / 2 5 / 1 2 / 1 1 2 / - 5 . 5 3 / 9 2 0 . 1 0 0 . 1 0 9 . 8 1 5 . 0 . 0 5 / . 3 5 9 0 0 2 0 R I H w / 9 5 / 8 " C s g 6- A u g 7 9 3 0 9 . 4 0 5 4 1 3 1 9 1 0 / 1 6 / 2 0 4 . 8 4 5 / 3 2 / 2 8 / 2 0 / 1 1 / 9 2 / - 5 . 5 3 / 9 2 0 . 1 0 0 . 0 5 9 . 4 1 8 . 5 . 0 3 / . 3 0 9 0 0 2 0 C i r c & C o n d M u d f o r C e m e n t 7- A u g 7 9 3 0 9 . 4 0 5 0 1 3 1 8 9 / 1 1 / 1 4 5 . 2 4 4 / 3 1 / 2 6 / 2 0 / 1 0 / 9 2 / - 5 . 5 2 / 9 2 . 5 0 . 1 0 0 . 1 0 9 . 4 1 7 . 0 . 0 5 / . 3 0 9 0 0 2 0 T e s t B O P s 8- A u g 7 9 3 0 9 . 3 0 4 4 1 3 1 5 9 / 1 1 / 1 3 5 . 2 4 1 / 2 8 / 2 3 / 1 8 / 9 / 8 2 / - 5 . 5 2 / 9 2 . 5 0 . 1 0 0 . 1 0 9 . 3 1 7 . 0 . 0 2 / . 2 5 9 0 0 2 0 R I H w / B H A # 5 Oi l B a s e d M u d R e c o r d 7, 9 3 0 ' t o 1 3 , 8 8 2 ' Da t e D e p t h W t V i s P V Y P G e l s F i l t R6 0 0 / R 3 0 0 / R 2 0 0 / R 1 0 0 / R6 / R 3 Ca k e C or r . So l i d Oi l / W a t e r Oi l P m L i m e S a l t C l - E mu l St a b i l i t y Sd Remarks ft - M D p p g s e c l b / 1 0 0 l b / 1 0 0 f t 2 m / 3 0 m R h e o m e t e r 3 2 n d s % v o l % v o l l b / b b l % W t m g / L m g / l % v o l 9- A u g 7 9 3 0 9 . 2 5 4 7 1 1 1 4 5 / 5 / 5 5 . 3 3 6 / 2 5 / 1 9 / 1 4 / 6 / 5 - / 2 8 . 4 6 5 / 3 5 5 7 2 . 5 0 3 . 2 5 3 0 . 6 4 8 7 5 0 0 4 5 5 - D r i l l o u t c e m e n t 10 - A u g 9 5 5 8 9 . 3 0 4 9 1 6 2 0 8 / 8 / 9 5 . 0 5 2 / 3 6 / 3 0 / 2 1 / 8 / 7 - / 2 9 . 4 6 5 / 3 5 5 7 2 . 8 0 3 . 6 4 2 7 . 9 9 7 7 0 0 0 6 3 5 0 . 1 0 D r i l l a h e a d 11 - A u g 9 8 6 0 9 . 3 0 4 6 1 4 1 4 7 / 7 / 8 4 . 8 4 2 / 2 8 / 2 3 / 1 7 / 8 / 7 - / 1 . 5 1 0 . 3 6 7 / 3 3 5 8 2 . 7 5 3 . 5 8 2 6 . 8 4 6 8 0 0 0 6 8 0 t r L / D B H A # 5 12 - A u g 9 8 6 0 9 . 3 0 4 6 1 3 1 5 7 / 7 / 8 4 . 8 4 1 / 2 8 / 2 3 / 1 7 / 8 / 7 - / 1 . 5 1 0 . 3 6 7 / 3 3 5 8 3 . 0 5 3 . 9 7 2 6 . 5 5 6 7 0 0 0 7 2 0 t r T o p D r i v e R e p a i r 13 - A u g 9 8 6 0 9 . 3 0 4 6 1 3 1 5 7 / 7 / 8 - 4 1 / 2 8 / 2 3 / 1 7 / 8 / 7 - / - 1 0 . 3 6 7 / 3 3 5 8 2 . 7 5 3 . 5 8 2 6 . 8 4 6 8 0 0 0 6 7 5 t r P / U B H A # 6 14 - A u g 1 0 7 0 0 9 . 4 0 4 8 1 4 1 7 7 / 7 / 8 4 . 2 4 5 / 3 1 / 2 5 / 1 8 / 8 / 7 - / 1 . 5 1 1 . 4 6 7 / 3 3 5 8 3 . 5 0 3 . 9 0 2 6 . 9 5 6 6 0 0 0 6 0 5 0 . 1 5 D r i l l a h e a d 15 - A u g 1 2 8 1 8 9 . 4 0 4 7 1 3 2 2 7 / 8 / 8 4 . 6 4 8 / 3 5 / 2 8 / 2 1 / 8 / 7 - / 2 1 1 . 7 6 8 / 3 2 5 8 2 . 7 0 3 . 5 1 2 6 . 5 2 6 4 0 0 0 6 5 0 0 . 2 0 D r i l l a h e a d 16 - A u g 1 3 8 8 2 9 . 4 0 4 8 1 5 1 8 7 / 8 / 8 4 . 4 4 8 / 3 3 / 2 8 / 2 0 / 8 / 7 - / 2 1 1 . 9 6 7 / 3 3 5 7 2 . 5 0 3 . 2 5 2 5 . 9 4 6 4 0 0 0 6 7 5 0 . 2 0 B R O O H 17 - A u g 1 3 8 8 2 9 . 4 0 4 6 1 3 1 5 6 / 6 / 7 4 . 2 4 1 / 2 8 / 2 3 / 1 6 / 7 / 6 - / 2 1 1 . 8 6 7 / 3 3 5 8 2 . 2 0 2 . 8 6 2 5 . 5 7 6 2 0 0 0 7 1 5 0 . 2 0 B R O O H 18 - A u g 1 3 8 8 2 9 . 4 0 5 2 1 4 1 6 6 / 6 / 7 - 4 4 / 3 0 / 2 3 / 1 7 / 7 / 6 - 1 1 . 4 6 7 / 3 3 5 8 2 . 3 5 3 . 0 6 2 7 . 9 4 7 0 0 0 0 6 8 0 0 . 1 0 C i r c u l a t e a n d c o n d i t i o n m u d 19 - A u g 1 3 8 8 2 9 . 4 0 4 5 1 4 1 4 6 / 6 / 7 - 4 2 / 2 8 / 2 3 / 1 7 / 7 / 6 - 1 4 . 3 5 8 / 2 8 - 3 . 0 0 - - - - - D i s p l a c e t o b r i n e 13 3 / 8 " S u r f a c e @ 2 , 9 2 0 ' M D Ca s i n g R e c o r d Pr o d u c t i o n S e c t i o n In t e r m e d i a t e S e c t i o n Sp y I s l a n d No r t h S l o p e Al a s k a 25 - J u n - 1 2 16 - A u g - 1 2 20 " C o n d u c t o r @ 1 6 0 ' M D SI 2 5 - N 2 EN I P e t r o l e u m MI S w a c o Do y o n 1 5 9 5 / 8 " I n t e r m e d i a t e @ 7 , 9 1 0 ' M D Su r f a c e S e c t i o n Fa z e P r o MI S p u d M u d LS N D AK - A M - 0 0 0 9 6 4 9 1 7 0 Well Name:Depth (MD)to ft Location:(TVD)to ft Operator:Show Report No. Show Report Report Prepared By:Formation: Report Delivered To:Date Drilled: Depth ft C1 C1 C1 C1 Flowline Background Show C2 C3 C4 C5 ppm ppm ppm Hydrocarbon Ratios C1 -=C1/C2 = C2 -=C1/C3 = C3 -=C1/C4 = C4 -=C1/C5 = C5 -= Production Analysis Gas Oil Water x Non-Producible Hydrocarbons Depth ft Flowline Background Show ppm ppm ppm Hydrocarbon Ratios C1 -=C1/C2 = C2 -=C1/C3 = C3 -=C1/C4 = C4 -=C1/C5 = C5 -= Production Analysis Gas Oil Water x Non-Producible Hydrocarbons Depth ft C1 C1 C1 C1 Flowline Background Show C2 C3 C4 C5 ppm ppm ppm Hydrocarbon Ratios C1 -=C1/C2 = C2 -=C1/C3 = C3 =C1/C4 = C4 -=C1/C5 = C5 -= Production Analysis Gas Oil Water x Non-Producible Hydrocarbons Depth ft Flowline Background Show ppm ppm ppm Hydrocarbon Ratios C1 -=C1/C2 = C2 -=C1/C3 = C3 -=C1/C4 = C4 -=C1/C5 = C5 -= Production Analysis Gas Oil Water x Non-Producible Hydrocarbons SI25-N2 Hydrocarbon Ratios 1000 Mud Chlorides (mg/L) =1000 3731 1 3627 Andrew Buchanan No producible oil within these zones based upon gas and chromatograph data collected. 1159 Mud Chlorides (mg/L) =1000 434 211 105 128 209498 348 2294 6452 6400 7300 1000Mud Chlorides (mg/L) = Spy Island eni Petroleum Emil Opitz 121 263 827 61 766 0 164 468 120 Mud Chlorides (mg/L) = 1236 155339 3-Aug-12 N Sands & OA Sands 702 111 2789 88 1882 100 7222 1784 1016 217426 7928 59 97 405 194 531 7064 0 140 183 0 711 36983 198 638 6636 67971 183 641 108 12435 164 265 54 591 221265 324 140 0 36272 259 137 194 226 190 84 160 87 929 78 1158 129 252 78 148887 1105 1552 6435 1782 Interpretation: Gas Units Gas Units Gas Units Gas Units 55536 530 2701 Hydrocarbon Ratios 2 1 3 4 1725 1 10 100 1000 Oil Gas NPH NPH 1 10 100 1000 NPH Oil Gas NPH Well Name:Depth (MD)to ft Location:(TVD)to ft Operator:Show Report No. Show Report Report Prepared By:Formation: Report Delivered To:Date Drilled: Depth ft C1 C1 C1 C1 Flowline Background Show C2 C3 C4 C5 ppm ppm ppm Hydrocarbon Ratios C1 -=C1/C2 = C2 -=C1/C3 = C3 -=C1/C4 = C4 -=C1/C5 = C5 -= Production Analysis Gas Oil Water x Non-Producible Hydrocarbons Depth ft Flowline Background Show ppm ppm ppm Hydrocarbon Ratios C1 -=C1/C2 = C2 -=C1/C3 = C3 -=C1/C4 = C4 -=C1/C5 = C5 -= Production Analysis Gas Oil Water x Non-Producible Hydrocarbons Depth ft C1 C1 C1 C1 Flowline Background Show C2 C3 C4 C5 ppm ppm ppm Hydrocarbon Ratios C1 -=C1/C2 = C2 -=C1/C3 = C3 =C1/C4 = C4 -=C1/C5 = C5 -= Production Analysis Gas Oil Water x Non-Producible Hydrocarbons Depth ft Flowline Background Show ppm ppm ppm Hydrocarbon Ratios C1 -=C1/C2 = C2 -=C1/C3 = C3 -=C1/C4 = C4 -=C1/C5 = C5 -= Production Analysis Gas Oil Water x Non-Producible Hydrocarbons SI25-N2 Hydrocarbon Ratios 84500 Mud Chlorides (mg/L) =82500 3758 2 3777 Andrew Buchanan No producible oil within these zones based upon gas and chromatograph data collected. 261 Mud Chlorides (mg/L) =82500 385 178 280 488 194750 268 1871 11920 8200 9400 87000Mud Chlorides (mg/L) = Spy Island eni Petroleum Emil Opitz 691 1056 315 137 178 14 102 321 53 Mud Chlorides (mg/L) = 383 203300 10-Aug-12 OA Sands 271 222 545 30 634 101 9270 326 227 197164 2414 44 57 289 111 442 8982 52 243 465 41 3882 91232 206 721 8580 191515 424 1802 51 3619 116 326 87 49 856274 824 278 35 87350 359 319 1075 1967 1119 359 701 128 99 98 285 672 3906 378 191380 174 1911 8240 533 Interpretation: Gas Units Gas Units Gas Units Gas Units 187896 670 515 Hydrocarbon Ratios 2 1 3 4 282 1 10 100 1000 Oil Gas NPH NPH 1 10 100 1000 NPH Oil Gas NPH Well Name:Depth (MD)to ft Location:(TVD)to ft Operator:Show Report No. Show Report Report Prepared By:Formation: Report Delivered To:Date Drilled: Depth ft C1 C1 C1 C1 Flowline Background Show C2 C3 C4 C5 ppm ppm ppm Hydrocarbon Ratios C1 -=C1/C2 = C2 -=C1/C3 = C3 -=C1/C4 = C4 -=C1/C5 = C5 -= Production Analysis Gas Oil Water x Non-Producible Hydrocarbons Depth ft Flowline Background Show ppm ppm ppm Hydrocarbon Ratios C1 -=C1/C2 = C2 -=C1/C3 = C3 -=C1/C4 = C4 -=C1/C5 = C5 -= Production Analysis Gas Oil Water x Non-Producible Hydrocarbons Depth ft C1 C1 C1 C1 Flowline Background Show C2 C3 C4 C5 ppm ppm ppm Hydrocarbon Ratios C1 -=C1/C2 = C2 -=C1/C3 = C3 =C1/C4 = C4 -=C1/C5 = C5 -= Production Analysis Gas Oil Water x Non-Producible Hydrocarbons Depth ft Flowline Background Show ppm ppm ppm Hydrocarbon Ratios C1 -=C1/C2 = C2 -=C1/C3 = C3 -=C1/C4 = C4 -=C1/C5 = C5 -= Production Analysis Gas Oil Water x Non-Producible Hydrocarbons SI25-N2 Hydrocarbon Ratios 70000 Mud Chlorides (mg/L) =70000 3754 3 3758 Andrew Buchanan No producible oil within these zones based upon gas and chromatograph data collected. 264 Mud Chlorides (mg/L) =66000 216 110 272 561 153373 164 1443 10540 10000 11000 70000Mud Chlorides (mg/L) = Spy Island eni Petroleum Emil Opitz 655 1102 239 132 107 6 136 193 29 Mud Chlorides (mg/L) = 255 111684 14-Aug-12 OA Sands 194 220 581 74 449 105 10935 306 222 159236 5863 72 31 167 57 247 10670 21 283 606 21 4742 166344 276 485 10220 126512 585 1122 39 5247 142 390 89 -26 1188369 1483 295 12 161602 571 438 945 2644 876 294 739 164 58 94 161 628 -3890 303 101144 175 1013 10000 344 Interpretation: Gas Units Gas Units Gas Units Gas Units 121265 446 507 Hydrocarbon Ratios 2 1 3 4 234 1 10 100 1000 Oil Gas NPH NPH 1 10 100 1000 NPH Oil Gas NPH Well Name:Depth (MD)to ft Location:(TVD)to ft Operator:Show Report No. Show Report Report Prepared By:Formation: Report Delivered To:Date Drilled: Depth ft C1 C1 C1 C1 Flowline Background Show C2 C3 C4 C5 ppm ppm ppm Hydrocarbon Ratios C1 -=C1/C2 = C2 -=C1/C3 = C3 -=C1/C4 = C4 -=C1/C5 = C5 -= Production Analysis Gas Oil Water x Non-Producible Hydrocarbons Depth ft Flowline Background Show ppm ppm ppm Hydrocarbon Ratios C1 -=C1/C2 = C2 -=C1/C3 = C3 -=C1/C4 = C4 -=C1/C5 = C5 -= Production Analysis Gas Oil Water x Non-Producible Hydrocarbons Depth ft C1 C1 C1 C1 Flowline Background Show C2 C3 C4 C5 ppm ppm ppm Hydrocarbon Ratios C1 -=C1/C2 = C2 -=C1/C3 = C3 =C1/C4 = C4 -=C1/C5 = C5 -= Production Analysis Gas Oil Water x Non-Producible Hydrocarbons Depth ft Flowline Background Show ppm ppm ppm Hydrocarbon Ratios C1 -=C1/C2 = C2 -=C1/C3 = C3 -=C1/C4 = C4 -=C1/C5 = C5 -= Production Analysis Gas Oil Water x Non-Producible Hydrocarbons SI25-N2 Hydrocarbon Ratios 65000 Mud Chlorides (mg/L) =65000 3751 4 3753 Andrew Buchanan No producible oil within these zones based upon gas and chromatograph data collected. 345 Mud Chlorides (mg/L) =65000 209 40 209 404 66242 125 776 4622 11000 12300 66000Mud Chlorides (mg/L) = Spy Island eni Petroleum Emil Opitz 190 2112 383 148 235 126 120 235 110 Mud Chlorides (mg/L) = 531 81055 15-Aug-12 OA Sands 340 203 750 171 791 85 12206 486 309 82533 16291 138 58 193 153 267 11820 194 242 570 78 7292 143212 276 471 11316 93110 492 837 67 8612 246 514 156 137 1133320 1322 317 75 135920 562 425 325 1227 350 108 676 255 54 94 437 175 558 114 76433 189 763 11050 706 Interpretation: Gas Units Gas Units Gas Units Gas Units 84498 404 579 Hydrocarbon Ratios 2 1 3 4 348 1 10 100 1000 Oil Gas NPH NPH 1 10 100 1000 NPH Oil Gas NPH Well Name:Depth (MD)to ft Location:(TVD)to ft Operator:Show Report No. Show Report Report Prepared By:Formation: Report Delivered To:Date Drilled: Depth ft C1 C1 C1 C1 Flowline Background Show C2 C3 C4 C5 ppm ppm ppm Hydrocarbon Ratios C1 -=C1/C2 = C2 -=C1/C3 = C3 -=C1/C4 = C4 -=C1/C5 = C5 -= Production Analysis Gas Oil Water x Non-Producible Hydrocarbons Depth ft Flowline Background Show ppm ppm ppm Hydrocarbon Ratios C1 -=C1/C2 = C2 -=C1/C3 = C3 -=C1/C4 = C4 -=C1/C5 = C5 -= Production Analysis Gas Oil Water x Non-Producible Hydrocarbons Depth ft C1 C1 C1 C1 Flowline Background Show C2 C3 C4 C5 ppm ppm ppm Hydrocarbon Ratios C1 -=C1/C2 = C2 -=C1/C3 = C3 =C1/C4 = C4 -=C1/C5 = C5 -= Production Analysis Gas Oil Water x Non-Producible Hydrocarbons Depth ft Flowline Background Show ppm ppm ppm Hydrocarbon Ratios C1 -=C1/C2 = C2 -=C1/C3 = C3 -=C1/C4 = C4 -=C1/C5 = C5 -= Production Analysis Gas Oil Water x Non-Producible Hydrocarbons Hydrocarbon Ratios 2 1 3 4 510 12913 866 Interpretation: Gas Units Gas Units Gas Units Gas Units 39114 355 776 169 362 99 92712 278 881 329 323 276 107 407 75 238 23 547 66 256 464397 595 389 28 63073 175 159 110 453 13252 47291 572 437 98 8177 224 480 83 361 593 21 1729 64802 313 78014 1159 31 88 182 150 304 13462 16-Aug-12 OA Sands 317 61 797 21 884 18 13645 541 339 57 282 88 136 203 107 Mud Chlorides (mg/L) = 570 94367 1655 12900 13882 64000Mud Chlorides (mg/L) = Spy Island eni Petroleum Emil Opitz 151 1222 344 Mud Chlorides (mg/L) =64000 216 32 110 181 76855 96 751 SI25-N2 Hydrocarbon Ratios 64000 Mud Chlorides (mg/L) =64000 3748 5 3758 Andrew Buchanan No producible oil within these zones based upon gas and chromatograph data collected. 1 10 100 1000 Oil Gas NPH NPH 1 10 100 1000 NPH Oil Gas NPH Marker MD INC AZ TVD TVDSS 16" Surface Borehole 20" Conductor Shoe 160.00 0.20 261.00 160.00 -106.08 SV-4 771.00 19.47 162.50 761.11 -707.19 SV-3 1180.00 34.07 164.65 1117.91 -1063.99 SV-2 1506.00 44.12 166.89 1373.25 -1319.33 Permafrost Base 2031.00 41.60 168.50 1762.60 -1708.68 SV-1 2254.00 41.76 175.69 1929.77 -1875.85 Ugnu Top (UG4)2678.00 41.50 194.62 2242.86 -2188.94 13 3/8" Casing Shoe 2922.00 41.64 206.19 2424.54 -2370.62 TD 16" Borehole 2936.00 41.67 206.40 2434.90 -2380.98 12 1/4" Intermediate Borehole UG-2 Coal Bed Marker 3380.00 41.71 236.23 2764.29 -2710.37 Lower Ugnu 4619.00 78.87 275.40 3403.56 -3349.64 Schrader Bluff Top 6263.00 83.10 286.93 3610.58 -3556.66 N Sequence Top 6614.00 83.19 288.37 3651.91 -3597.99 N Top 7007.00 82.56 298.33 3699.64 -3645.72 N-2 Top 7106.00 83.17 299.66 3712.59 -3658.67 N-3 Top 7121.00 83.49 299.93 3714.33 -3660.41 N Bottom 7265.00 85.17 302.50 3728.58 -3674.66 Int Fault 1 7518.00 86.77 312.10 3742.10 -3688.18 Int Fault 2 7818.00 86.10 314.06 3759.98 -3706.06 OA-2 Top 7895.00 85.40 313.56 3765.68 -3711.76 9 5/8" Intermediate Casing 7910.00 85.25 313.62 3766.90 -3712.98 OA-3 Top 7918.00 85.18 313.65 3767.57 -3713.65 TD 12 1/4" Borehole 7930.00 85.06 313.69 3768.59 -3714.67 8 3/4" Lateral Borehole Fault A 8022.00 86.72 314.90 3775.80 -3721.88 OA Bottom 8057.00 87.80 315.49 3777.49 -3723.57 OA Bottom 8156.00 91.30 317.22 3778.18 -3724.26 OA-4 Top 8350.00 92.96 320.84 3768.39 -3714.47 OA-3 Top 11105.00 91.79 305.42 3749.81 -3695.89 OA-2 Top 11275.00 89.75 305.00 3748.29 -3694.37 OA-2 Top 12603.00 89.66 308.50 3754.91 -3700.99 OA-3 Top 12870.00 87.67 314.62 3756.79 -3702.87 Fault B 12932.00 87.44 313.17 3759.43 -3705.51 OA-4 Top 13367.00 91.05 314.40 3757.26 -3703.34 TD 8 3/4" Borehole 13882.00 89.93 325.56 3748.67 -3694.75 SI25-N2 Interpolated Tops DIRECTIONAL SURVEY REPORT Eni Petroleum SI25-N2 Nikaitchuq Alaska United States AK-XX-0009649170 Measured Vertical Vertical Depth Inclination Direction Depth Latitude Departure Section Dogleg (feet)(degrees)(degrees)(feet)(feet)(feet)(feet)(deg/100ft) 0.00 0.00 0.00 0.00 0.00 N 0.00 E 0.00 TIE-IN 81.00 0.58 341.29 81.00 0.39 N 0.13 W 0.39 0.72 117.00 0.45 331.24 117.00 0.68 N 0.26 W 0.68 0.44 148.00 0.16 268.69 148.00 0.79 N 0.36 W 0.79 1.30 183.00 0.27 252.34 183.00 0.76 N 0.49 W 0.76 0.36 275.00 2.31 186.81 274.97 1.14 S 0.91 W -1.14 2.40 368.00 6.43 182.79 367.68 8.21 S 1.39 W -8.21 4.44 399.00 7.75 182.73 398.44 12.03 S 1.57 W -12.03 4.26 430.00 8.73 180.35 429.12 16.47 S 1.69 W -16.47 3.35 461.00 9.50 178.36 459.73 21.38 S 1.63 W -21.38 2.68 554.00 10.91 172.05 551.26 37.77 S 0.19 W -37.77 1.93 648.00 13.41 169.31 643.14 57.29 S 3.06 E -57.29 2.73 741.00 17.86 162.85 732.69 81.53 S 9.27 E -81.53 5.13 835.13 22.92 161.90 820.89 112.77 S 19.23 E -112.77 5.39 897.55 27.19 161.11 877.42 137.82 S 27.62 E -137.82 6.86 960.00 28.91 162.02 932.54 165.68 S 36.90 E -165.68 2.84 1054.09 33.33 163.05 1013.07 212.07 S 51.47 E -212.07 4.73 1147.16 33.72 163.91 1090.65 261.35 S 66.08 E -261.35 0.66 1240.67 34.73 165.98 1167.97 312.13 S 79.73 E -312.13 1.65 1333.16 37.09 167.64 1242.88 364.94 S 92.08 E -364.94 2.76 1426.22 41.66 168.55 1314.80 422.70 S 104.24 E -422.70 4.95 1520.97 44.59 166.60 1383.95 485.93 S 118.20 E -485.93 3.40 1614.52 43.46 166.18 1451.21 549.12 S 133.50 E -549.12 1.25 1707.61 41.83 165.81 1519.69 610.31 S 148.75 E -610.31 1.77 1800.88 41.18 166.04 1589.54 670.26 S 163.79 E -670.26 0.72 1894.38 41.15 166.65 1659.92 730.07 S 178.32 E -730.07 0.43 1988.34 41.24 168.23 1730.63 790.47 S 191.77 E -790.47 1.11 2081.66 42.01 168.90 1800.39 851.22 S 204.06 E -851.22 0.95 2173.96 40.81 171.28 1869.61 911.35 S 214.58 E -911.35 2.14 2266.83 41.93 176.38 1939.33 972.33 S 221.14 E -972.33 3.82 2361.61 43.43 179.57 2009.01 1036.53 S 223.38 E -1036.53 2.78 2453.23 42.55 182.14 2076.03 1098.98 S 222.46 E -1098.98 2.14 2548.04 42.48 186.65 2145.93 1162.83 S 217.56 E -1162.83 3.22 2641.46 41.37 192.67 2215.47 1224.31 S 207.13 E -1224.31 4.47 2734.85 41.77 197.63 2285.36 1284.08 S 190.94 E -1284.08 3.55 2827.91 42.53 201.92 2354.36 1342.81 S 169.80 E -1342.81 3.20 2864.45 41.55 203.71 2381.50 1365.37 S 160.32 E -1365.37 4.24 2952.14 41.71 207.49 2447.06 1417.88 S 135.15 E -1417.88 2.87 3044.46 42.69 216.21 2515.51 1470.43 S 102.46 E -1470.43 6.43 3137.72 42.32 223.44 2584.30 1518.76 S 62.17 E -1518.76 5.25 3231.28 42.22 227.75 2653.55 1562.77 S 17.23 E -1562.77 3.10 3324.86 41.74 232.21 2723.13 1603.01 S 30.67 W -1603.01 3.23 3418.35 41.78 239.02 2792.90 1638.13 S 81.99 W -1638.13 4.85 3511.88 42.32 244.37 2862.38 1667.80 S 137.11 W -1667.80 3.87 3605.62 44.12 251.86 2930.73 1691.63 S 196.61 W -1691.63 5.80 3698.90 46.52 258.07 2996.35 1708.74 S 260.62 W -1708.74 5.39 3792.54 50.36 264.05 3058.49 1719.51 S 329.78 W -1719.51 6.29 3884.49 54.43 268.55 3114.61 1724.13 S 402.43 W -1724.13 5.88 3978.75 57.54 270.81 3167.33 1724.54 S 480.54 W -1724.54 3.85 4072.24 60.58 273.10 3215.40 1721.78 S 560.67 W -1721.78 3.87 4165.41 63.18 273.10 3259.31 1717.34 S 642.71 W -1717.34 2.79 4258.43 66.85 274.04 3298.59 1712.08 S 726.85 W -1712.08 4.05 4351.63 69.67 274.80 3333.11 1705.40 S 813.15 W -1705.40 3.12 4445.03 73.51 274.65 3362.60 1698.10 S 901.45 W -1698.10 4.11 4538.57 76.77 275.00 3386.59 1690.50 S 991.53 W -1690.50 3.50 4630.66 79.18 275.46 3405.77 1682.29 S 1081.22 W -1682.29 2.66 4725.10 81.34 277.34 3421.75 1671.91 S 1173.71 W -1671.91 3.01 4818.44 82.26 279.69 3435.06 1658.23 S 1265.07 W -1658.23 2.68 4910.78 83.67 281.59 3446.38 1641.30 S 1355.13 W -1641.30 2.55 5004.48 83.19 282.86 3457.10 1621.59 S 1446.10 W -1621.59 1.44 5097.69 83.22 282.95 3468.12 1600.92 S 1536.32 W -1600.92 0.10 5190.64 81.74 284.03 3480.29 1579.43 S 1625.92 W -1579.43 1.97 5284.40 82.90 284.69 3492.82 1556.38 S 1715.94 W -1556.38 1.42 5377.68 82.91 285.81 3504.34 1532.04 S 1805.24 W -1532.04 1.19 5471.17 83.35 286.36 3515.52 1506.32 S 1894.43 W -1506.32 0.75 5564.79 82.96 285.72 3526.68 1480.64 S 1983.76 W -1480.64 0.80 5657.91 83.27 286.29 3537.85 1455.15 S 2072.62 W -1455.15 0.69 5750.18 83.34 286.33 3548.60 1429.41 S 2160.58 W -1429.41 0.09 5843.53 82.93 286.39 3559.76 1403.31 S 2249.50 W -1403.31 0.44 5937.35 83.15 287.06 3571.13 1376.51 S 2338.69 W -1376.51 0.75 6031.21 83.32 286.76 3582.19 1349.40 S 2427.87 W -1349.40 0.37 6124.27 82.72 286.96 3593.50 1322.60 S 2516.27 W -1322.60 0.68 6217.21 83.01 286.89 3605.04 1295.76 S 2604.49 W -1295.76 0.32 6310.64 83.19 286.97 3616.26 1268.75 S 2693.23 W -1268.75 0.21 6403.60 83.04 286.35 3627.41 1242.29 S 2781.64 W -1242.29 0.68 6497.09 83.58 286.34 3638.30 1216.16 S 2870.74 W -1216.16 0.58 6590.67 83.13 287.81 3649.13 1188.87 S 2959.59 W -1188.87 1.63 6684.23 83.37 290.05 3660.13 1158.73 S 3047.48 W -1158.73 2.39 6776.88 83.03 294.25 3671.10 1124.05 S 3132.66 W -1124.05 4.52 6870.63 82.82 296.61 3682.65 1084.10 S 3216.68 W -1084.10 2.51 6963.74 82.95 297.93 3694.18 1041.77 S 3298.80 W -1041.77 1.41 7056.66 82.11 298.78 3706.26 998.02 S 3379.88 W -998.02 1.28 7150.56 84.12 300.46 3717.52 951.94 S 3460.91 W -951.94 2.78 7242.92 84.59 301.83 3726.61 904.41 S 3539.57 W -904.41 1.56 7337.21 87.06 304.67 3733.47 852.85 S 3618.20 W -852.85 3.99 7429.98 87.61 309.00 3737.79 797.31 S 3692.35 W -797.31 4.70 7524.09 86.71 312.65 3742.45 735.87 S 3763.47 W -735.87 3.99 7617.43 86.65 314.01 3747.86 671.93 S 3831.25 W -671.93 1.46 7709.73 86.69 313.99 3753.22 607.92 S 3897.53 W -607.92 0.05 7803.08 86.23 314.18 3758.98 543.10 S 3964.46 W -543.10 0.53 7884.91 85.50 313.52 3764.88 486.56 S 4023.31 W -486.56 1.20 7957.42 84.79 313.80 3771.02 436.68 S 4075.58 W -436.68 1.05 8050.33 87.56 315.38 3777.22 371.61 S 4141.59 W -371.61 3.43 8143.61 90.96 316.96 3778.42 304.33 S 4206.17 W -304.33 4.02 8237.01 93.52 318.95 3774.77 235.03 S 4268.67 W -235.03 3.47 8330.52 93.05 320.47 3769.41 163.83 S 4329.04 W -163.83 1.70 8423.99 92.61 322.23 3764.80 90.92 S 4387.34 W -90.92 1.94 8517.44 90.79 325.41 3762.02 15.54 S 4442.47 W -15.54 3.92 8610.90 90.69 329.33 3760.82 63.15 N 4492.85 W 63.15 4.20 8704.34 90.91 329.57 3759.51 143.61 N 4540.34 W 143.61 0.35 8797.80 90.42 327.73 3758.43 223.42 N 4588.96 W 223.42 2.04 8891.12 89.69 326.11 3758.34 301.61 N 4639.89 W 301.61 1.90 8984.54 91.08 322.88 3757.71 377.65 N 4694.14 W 377.65 3.76 9077.83 90.28 319.46 3756.60 450.30 N 4752.62 W 450.30 3.76 9171.22 89.34 317.65 3756.91 520.30 N 4814.43 W 520.30 2.18 9264.60 89.21 316.02 3758.09 588.41 N 4878.31 W 588.41 1.75 9357.99 90.74 315.57 3758.14 655.35 N 4943.42 W 655.35 1.71 9451.39 89.63 315.72 3757.83 722.13 N 5008.71 W 722.13 1.20 9544.80 89.41 314.15 3758.62 788.10 N 5074.83 W 788.10 1.70 9638.23 89.44 311.34 3759.55 851.51 N 5143.44 W 851.51 3.01 9731.62 92.05 312.32 3758.34 913.78 N 5213.01 W 913.78 2.99 9794.69 90.66 312.63 3756.85 956.36 N 5259.52 W 956.36 2.26 9888.65 89.67 314.08 3756.58 1020.86 N 5327.83 W 1020.86 1.87 9981.78 88.40 313.02 3758.15 1085.01 N 5395.32 W 1085.01 1.78 10075.14 88.96 312.75 3760.30 1148.53 N 5463.71 W 1148.53 0.67 10168.34 90.09 311.70 3761.07 1211.16 N 5532.72 W 1211.16 1.66 10261.37 90.81 310.96 3760.34 1272.59 N 5602.57 W 1272.59 1.11 10354.79 90.91 308.64 3758.94 1332.38 N 5674.33 W 1332.38 2.49 10450.93 89.66 309.04 3758.46 1392.67 N 5749.22 W 1392.67 1.37 10546.96 89.14 307.79 3759.46 1452.34 N 5824.45 W 1452.34 1.41 10643.21 89.20 308.14 3760.86 1511.54 N 5900.33 W 1511.54 0.37 10739.40 89.48 306.36 3761.97 1569.76 N 5976.89 W 1569.76 1.87 10835.70 92.77 308.34 3760.08 1628.16 N 6053.41 W 1628.16 3.99 10931.93 91.72 307.18 3756.31 1687.04 N 6129.43 W 1687.04 1.63 11028.27 92.55 306.16 3752.72 1744.53 N 6206.65 W 1744.53 1.36 11124.54 91.60 305.23 3749.23 1800.67 N 6284.78 W 1800.67 1.38 11220.81 89.78 305.64 3748.07 1856.47 N 6363.21 W 1856.47 1.94 11316.84 89.73 304.51 3748.48 1911.66 N 6441.79 W 1911.66 1.18 11413.02 89.18 303.83 3749.40 1965.67 N 6521.37 W 1965.67 0.91 11509.30 89.77 303.66 3750.28 2019.15 N 6601.42 W 2019.15 0.64 11605.58 90.09 304.15 3750.40 2072.86 N 6681.33 W 2072.86 0.61 11701.87 90.06 303.72 3750.27 2126.61 N 6761.22 W 2126.61 0.45 11798.37 90.12 303.61 3750.12 2180.11 N 6841.54 W 2180.11 0.13 11894.55 89.98 304.81 3750.04 2234.18 N 6921.07 W 2234.18 1.26 11990.08 88.15 305.49 3751.59 2289.17 N 6999.17 W 2289.17 2.04 12086.86 90.79 308.09 3752.49 2347.12 N 7076.66 W 2347.12 3.83 12183.90 90.25 311.62 3751.61 2409.29 N 7151.14 W 2409.29 3.68 12279.68 90.15 312.15 3751.27 2473.24 N 7222.44 W 2473.24 0.56 12375.86 90.01 311.30 3751.14 2537.25 N 7294.23 W 2537.25 0.90 12472.21 88.09 309.01 3752.74 2599.37 N 7367.85 W 2599.37 3.10 12568.14 89.59 307.27 3754.68 2658.60 N 7443.28 W 2658.60 2.39 12664.41 89.79 310.67 3755.20 2719.13 N 7518.11 W 2719.13 3.54 12760.76 90.61 314.79 3754.87 2784.49 N 7588.87 W 2784.49 4.36 12857.01 87.72 314.93 3756.27 2852.37 N 7657.08 W 2852.37 3.01 12953.23 87.36 312.67 3760.40 2918.90 N 7726.46 W 2918.90 2.38 13049.54 88.91 310.77 3763.53 2982.96 N 7798.30 W 2982.96 2.55 13145.88 91.51 311.35 3763.18 3046.23 N 7870.94 W 3046.23 2.77 13242.19 91.97 311.88 3760.26 3110.16 N 7942.91 W 3110.16 0.73 13338.10 90.99 313.64 3757.78 3175.26 N 8013.30 W 3175.26 2.10 13434.72 91.19 316.17 3755.94 3243.44 N 8081.72 W 3243.44 2.63 13531.00 91.74 319.39 3753.48 3314.71 N 8146.38 W 3314.71 3.39 13627.78 90.72 322.91 3751.40 3390.06 N 8207.07 W 3390.06 3.79 13723.58 91.35 326.67 3749.67 3468.30 N 8262.29 W 3468.30 3.98 13819.21 89.93 325.56 3748.60 3547.68 N 8315.60 W 3547.68 1.88 13882.00 89.93 325.56 3748.68 3599.46 N 8351.11 W 3599.46 0.00 CALCULATION BASED ON MINIMUM CURVATURE METHOD SURVEY COORDINATES RELATIVE TO WELL SYSTEM REFERENCE POINT TVD VALUES GIVEN RELATIVE TO DRILLING MEASUREMENT POINT VERTICAL SECTION RELATIVE TO WELL HEAD VERTICAL SECTION IS COMPUTED ALONG A DIRECTION OF 0.00 DEGREES (GRID) A TOTAL CORRECTION OF 0.00 DEG FROM MAGNETIC NORTH TO GRID NORTH HAS BEEN APPLIED HORIZONTAL DISPLACEMENT IS RELATIVE TO THE WELL HEAD. HORIZONTAL DISPLACEMENT(CLOSURE) AT 13882.00 FEET IS 9093.80 FEET ALONG 293.32 DEGREES (GRID) Date Printed:19 September 2012 0 1000 2000 3000 4000 5000 6000 7000 8000 9000 10000 11000 12000 13000 14000 15000 0 4 8 12 16 20 24 28 Me a s u r e d D e p t h Rig Days Prognosed Actual SI25-N2 Days vs. Depth 27 Jul 2012 Reached surface TD at 1700 hrs 2936' MD / 2436' TVD 6 Aug 2012 Run & Land 9 5/8" casing at 7910' MD 9 Aug 2012 RIH with BHA #5, FIT to13.0 ppg EMW, Drill ahead 28 Jul 2012 Run & Land 13 3/8" casing at 2922' MD 30 Jul 2012 RIH with BHA #3, LOT 12.2 ppg EMW, Drill ahead 25 Jul 2012 SDL rig up unit and gas equipment 25 Jul 2012 Pre Spud meeting and spud the well 2 Aug 2012 RIH with BHA #4 and resume drilling at 0630 hrs 1 Aug 2012 0630 hrs, POOH at 4864' MD for bit trip due to low ROP 4 Aug 2012 Reached intermediate TD at 0500 hrs 7930' MD / 3769' TVD 16 Aug 2012 Reached production TD at 1300 hrs 13822' MD/ 3748.7' TVD 13 Aug 2012 RIH with BHA #6 and resume drilling at 1300 hrs. 11 Aug 2012 0330 hrs, POOH at 9860' MD due to Xceed tool failure Surface Data Logging After Action Review Employee Name: Zach Beekman Date: 27-Jul-2012 Well: SI25-N2 Hole Section: Surface What went as, or better than, planned: Rigging up the Vortex Cooler went very smooth. Both with getting the rig to mount it to the wall and with rigging up the air lines. We are waiting to use it after surface casing because we are waiting for Neil Shexneider to become available to help with instruction. The installation was easy and very smooth. There was good communication between all parties during the surface hole as this was the first well on the island that we were not using a diverter line. Communication was key to make sure all parties were paying attention toany potential high gas or gains in the pits. No issues resulted, but everyone did a good job. Difficulties experienced: After updating to the new Insite version (7.3.7), we ran into a problem with our IRIS data mapping and the data being WITS'd in from Canrig. All our WITS'd data had no folder to write to so we had to re-do our IRIS data mapping to accept the data files. Also, while setting up the upper gas trap, the adjusting handle broke. This has caused us to use the lower trap during the surface section. Recommendations: In the future, lubricating the adjusting handle for the trap might be a good idea so it doesn't sieze up. Innovations and/or cost savings: Surface Data Logging After Action Review Employee Name: Zach Beekman Date: 6-Aug-2012 Well: SI25-N2 Hole Section: Intermediate What went as, or better than, planned: Insite worked as it was supposed to with minimal to no problems. Difficulties experienced: About half way through the intermediate section, all internet connections were lost between the camp. We lost out feed to the geologist/co man computers and our WITS feed to Petrolink. Though this was of no control to us it was quite bothersome. A GCI rep was notified and sent to the island to fix communications. We also had our last full size sieve get broken by one of our sample catchers. The sample catchers were left with a 4" sieve originally used for drying samples and easy to use for cleaning. Recommendations: Need to have a few extra sieves on hand for when they break. Innovations and/or cost savings: Surface Data Logging After Action Review Employee Name: Emil Opitz Date: 18-Aug-2012 Well: SI25-N2 Hole Section: Production What went as, or better than, planned: Insite worked as it was supposed to with minimal to no problems. Difficulties experienced: Gas trap motor siezed up just prior to drilling production section. ECD's were not being recognized by INSITE, therefore we were unable to send to RIGWATCH for all drilling personnel to see real time. Recommendations: We had a backup gas trap motor on hand, and the rig electritian wired it up with the previous traps' premeasured cable. This made for an easy swap out. We learned that due to an INSITE update, all settings were deleted. INSITE updates should either incorporate custom settings, or warn users to backup/save custom settings/records. If neither of these two possibilites are feasible, than at least inform personnel that they will need to re-create all custom records. We learned this after drilling had commenced, and were unable to make any changes until the next run was started in INSITE - even if we had made changes, they do not take effect until a new run is started in INSITE. Starting a new run while drilling ahead in production section is not an option, so we were forced to wait until we could start a new run. This prevented us from WITSing real-time ECD data to all rig personnel and screens, as well as the Geo, Pusher, Company Man, and K&M rep in camp; all of whom depend on us relaying this data to them. Innovations and/or cost savings: