Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAbout204-180CAUTION: This email originated from outside the State of Alaska mail system. Do not
click links or open attachments unless you recognize the sender and know the content
is safe.
From:NSK DHD Field Supv
To:Regg, James B (OGC); Brooks, Phoebe L (OGC); DOA AOGCC Prudhoe Bay; Wallace, Chris D (OGC)
Cc:WNS Wells Integrity Eng
Subject:CD1-06 ,11,13,16 and 20 non-witnessed MITIA"s 06-21-25
Date:Sunday, June 22, 2025 10:24:04 AM
Attachments:image001.png
MIT CRU CD1-6,11,13,16 and 20 SI TESTS 06-21-25.xlsx
Good Morning,
Please see the attached 10-426 form from the non witnessed shut in MITIA’s on CD1-06
,11,13,16 and 20 that were conducted on 6-21-25. If you have any questions please let me
know.
Thanks,
Bruce Richwine/Matt Miller
DHD Field Supervisor
KOC F-wing 2-14
(907) 659-7022 Office
(907) 943-0167 Cell
N2238@COP.com
&ROYLOOH5LYHU8QLW&'
37'
Submit to:
OOPERATOR:
FIELDD // UNITT // PAD:
DATE:
OPERATORR REP:
AOGCCC REP:
Well Pressures: Pretest Initial 15 Min. 30 Min. 45 Min. 60 Min.
PTD 2000830 Type Inj N Tubing 5 10 10 10 Type Test P
Packer TVD 6622 BBL Pump 1.9 IA 430 2000 1965 1960 Interval 4
Test psi 1656 BBL Return 1.9 OA 460 465 470 470 Result P
Well Pressures: Pretest Initial 15 Min. 30 Min. 45 Min. 60 Min.
PTD 2041800 Type Inj N Tubing 715 890 930 930 Type Test P
Packer TVD 6748 BBL Pump 1.6 IA 470 2000 1960 1960 Interval 4
Test psi 1687 BBL Return 1.6 OA 710 715 715 715 Result P
Well Pressures: Pretest Initial 15 Min. 30 Min. 45 Min. 60 Min.
PTD 1990520 Type Inj N Tubing 1080 1750 1290 1295 Type Test P
Packer TVD 6783 BBL Pump 1.0 IA 500 2040 1990 1985 Interval 4
Test psi 1696 BBL Return 1.0 OA 150 155 155 155 Result P
Well Pressures: Pretest Initial 15 Min. 30 Min. 45 Min. 60 Min.
PTD 1990940 Type Inj N Tubing 510 685 705 710 Type Test P
Packer TVD 6733 BBL Pump 1.2 IA 470 2010 1960 1955 Interval 4
Test psi 1683 BBL Return 1.2 OA 635 640 640 640 Result P
Well Pressures: Pretest Initial 15 Min. 30 Min. 45 Min. 60 Min.
PTD 2042400 Type Inj N Tubing 985 1165 1205 1205 Type Test P
Packer TVD 6843 BBL Pump 1.4 IA 440 2000 1950 1950 Interval 4
Test psi 1711 BBL Return 1.4 OA 600 610 610 610 Result P
Well Pressures: Pretest Initial 15 Min. 30 Min. 45 Min. 60 Min.
PTD Type Inj Tubing Type Test
Packer TVD BBL Pump IA Interval
Test psi BBL Return OA Result
Well Pressures: Pretest Initial 15 Min. 30 Min. 45 Min. 60 Min.
PTD Type Inj Tubing Type Test
Packer TVD BBL Pump IA Interval
Test psi BBL Return OA Result
Well Pressures: Pretest Initial 15 Min. 30 Min. 45 Min. 60 Min.
PTD Type Inj Tubing Type Test
Packer TVD BBL Pump IA Interval
Test psi BBL Return OA Result
TYPE INJ Codes TYPE TEST Codes INTERVAL Codes Result Codes
W = Water P = Pressure Test I = Initial Test P = Pass
G = Gas O = Other (describe in Notes) 4 = Four Year Cycle F = Fail
S = Slurry V = Required by Variance I = Inconclusive
I = Industrial Wastewater O = Other (describe in notes)
N = Not Injecting
Notes:
ConocoPhillips Alaska Inc,
Alpine / CRU / CD1 PAD
Van Camp / Burton
06/21/25
Notes:
Notes:
Notes:
Notes:
CD1-06
CD1-11
CD1-16
CD1-20
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
MMechanicall Integrityy Test
jim.regg@alaska.gov;AOGCC.Inspectors@alaska.gov;phoebe.brooks@alaska.gov chris.wallace@alaska.gov
Notes:
CD1-13
Notes:
CD1-20
Notes:
Form 10-426 (Revised 01/2017)2025-0621_MIT_CRU_CD1-11
9
9
9
9
999
99
9 9
9
9
-5HJJ
CD1-11
C:\Users\kmjunke\AppData\Local\Microsoft\Windows\INetCache\Content.Outlook\H2LGR515\2023-12-27_15962_CRU_CD1-11_CaliperSurvey_LogData_Transmittal.docx
DELIVERABLE DISCRIPTION
Ticket # Field Well # API # Log Description Log Date
15962 CRU CD1-11 50-103-20500-00 Caliper Survey w/ Log Data 27-Dec-23
DELIVERED TO
Company & Address
DIGITAL FILE
# of Copies
LOG PRINTS
# of Prints
CD’s
# of Copies
AOGCC
Attn: Natural Resources Technician
333 W. 7th Ave., Suite 100
Anchorage, Ak. 99501-3539
Delivered By: CPAI Sharefile
______________________________ ______________________________________
Date received Signature
PLEASE RETURN COPY VIA EMAIL TO:
DIANE.WILLIAMS@READCASEDHOLE.COM
READ CASED HOLE, INC., 4141 B STREET, SUITE 308, ANCHORAGE, AK 99503
PHONE: (907)245-8951
E-MAIL : READ-Anchorage@readcasedhole.com WEBSITE : WWW.READCASEDHOLE.COM
PTD: 204-180
T38263
1/10/2024
Kayla
Junke
Digitally signed
by Kayla Junke
Date: 2024.01.10
09:44:16 -09'00'
MEMORANDUM
TO: Jim Regg
P.I. Supervisor
FROM: Lou Laubenstein
Petroleum Inspector
NON -CONFIDENTIAL
State of Alaska
Alaska Oil and Gas Conservation Commission
DATE: Thursday, June 17, 2021
SUBJECT: Mechanical Integrity Tests
ConocoPhillips Alaska, Inc.
CDl-11
COLVILLE RIV UNIT CDI-I I
Src: Inspector
Reviewed By:
P.I. Supry J —
Comm
Well Name COLVILLE RIV UNIT CDI-I I API Well Number 50-103-20500-00-00 Inspector Name: Lou Laubenstein
Permit Number: 204-180-0
Inspection Date: 6/12/2021 ✓
Insp Num: mitLOL210612151730
Rel Insp Num:
Packer Depth Pretest
Initial 15 Min 30 Min 45 Min 60 Min
Well cD1-n 2510
Type Inj w .TVD 6788 -i Tubing _
2510 _ 2510- 2510 -
PTD
2041800 '
Type Test
SPT-
Test psi
1687
IA
675
1890 -
1855 _
j 1855 -
BBL Pumped: 1.8 113131, Returned:
1.8
OA
510 -
675
75
675 '
Interval 4YRTST IP/Fi' P
Notes:
Thursday, June 17, 2021 Page I of 1
• •
MEMORANDUM State of Alaska
Alaska Oil and Gas Conservation Commission
TO: Jim Regg DATE: Monday,June 19,2017
P.I.Supervisor ( jU I17 SUBJECT: Mechanical Integrity Tests
6 CONOCOPHILLIPS ALASKA INC
CD1-11
FROM: Bob Noble COLVILLE RIV UNIT CD1-I1
Petroleum Inspector
Src: Inspector
Reviewed By:
P.I.Supry
NON-CONFIDENTIAL Comm
Well Name COLVILLE RIV UNIT CD1-11 API Well Number 50-103-20500-00-00 Inspector Name: Bob Noble
Permit Number: 204-180-0 Inspection Date: 6/11/2017 ✓
Insp Num: mitRCN170612095428
Rel Insp Num:
Packer Depth Pretest Initial 15 Min 30 Min 45 Min 60 Min
Well CDI-11 Type Inj W 'TVD 6748 - Tubing 2225 - 2225 2225- 2225 -
PTD 2041800 Type Test SPT Test psi 1687 - IA 1470 3000 - 2960 - 2950
BBL Pumped: 2.2 BBL Returned: 1 7 - OA 700 - 700 - 700 - 700
Interval 4YRTST P/F P ✓
Notes:
%AHMED AUG 2 3 2 0
Monday,June 19,2017 Page 1 of 1
MEMORANDUM State of Alaska
Alaska Oil and Gas Conservation Commission
TO: Regg DATE:Tuesday,June 18,2013
Jim Re '7
P.I.Supervisor ( q qfr( 1 3 SUBJECT: Mechanical Integrity Tests
CONOCOPHILLIPS ALASKA INC
CDI-I I
FROM: Jeff Turkington COLVILLE RIV UNIT CDl-I I
Petroleum Inspector
Src: Inspector
Reviewed By:
P.I.Supry,,.i "
NON-CONFIDENTIAL Comm
Well Name COLVILLE RIV UNIT CDI-l1 API Well Number 50-103-20500-00-00 Inspector Name: Jeff Turkington
Permit Number: 204-180-0 Inspection Date: 6/12/2013
Insp Num: mitJAT130614191417
Rel Insp Num:
Packer Depth Pretest Initial 15 Min 30 Min 45 Min 60 Min
Well CD]-11 Type In' 1 W•'TVD 6748 IA 640 2000 1920 1910
T --e Test ..
X041800 SPT 1687 - OA 660 - 660 660 � 670
Interval YP
PTD Test psi
val
aYRTST IP/F P Tubingd 2540 2540 2540 2540 '
Notes: 1.6 bbl diesel to fill.
SCANNED FEB 2 0 2014
Tuesday,June 18,2013 Page 1 of 1
~
MEMORANDUM
To: Jim Regg ~l`
P.L Supervisor ` \~l'y~' ~(7~I ~~
l,
FROM: Bob Noble
Petroleum Inspector
~
State of Alaska
Alaska Oil and Gas Conservation Commission
DATE: Monday, June 22, 2009
SUBJECT: Mechanical Integrity Tests
CONOCOPHILLIPS ALASKA INC
CDl-11
COLVILLE RIV UNIT CDl-11
Src: Inspector
NON-CONFIDENTIAL
Reviewed By:
P.I. Suprv ~
Comm
Well Name: COLVILLE RIV iJNIT CDI-11 API Well Number: 50-103-20500-00-00 Inspector Name: Bob Noble
Insp Num: mitRCN090617211419 Permit Number: 204-180-0 ~ InspeCtion Date: 6/13/2009
Rel Insp Num:
Packer Depth Pretest Initial 15 Min. 30 Min. 45 Min. 60 Min.
We~~ CDl-11 Type Inj. W 7'~ 6748 / jA 2000 2730 2680 2680 ~
P.T.D zoaisoo TypeTest SPT Test psi 2~30 ,/ OA ~oo ~oo ~oo ~oo
Interval a~rsT p~ r ~ Tubing 1222 izz2 izzz izzz
Notes:
~1~ n. °E~ ~r~5t.~.r~- j~~.7~`
. . ~OC~
` ~1~~.~~`~`j°~ '" , ~
4~ Ld.:+ ~t '
V
Monday, June 22, 2009 Page 1 of 1
4 year state witnessed MITIA for CD 1-11 Page 1 of 1
•
Regg, James B (DOA)
From: NSK Problem Well Supv [n1617@conocophillips.com] ~~ ~ ~ItS~
Sent: Friday, June 27, 2008 9:18 AM
To: Regg, James B (DOA); Maunder, Thomas E (DOA); Fleckenstein, Robert J (DOA); DOA
AOGCC Prudhoe Bay
Subject: 4 year state witnessed MITIA for CD1-11
Attachments: MIT KRU CD1-11 06-26-08.x1s
Jim /Tom
This is the last of the 4 year state witnessed MITIA for the month of June.
Please let me know if you have any questions.
Russ Colee
Problem Wells Supervisor
659-7224 «MIT KRU CD1-11 06-26-08.x1s»
~P~NE~ JUL ~ ~ 2008
7/15/2008
•
Email to:jim.regg@alaska.gov; tom.maunder@alaska.gov;bob.fleckenstein@alaska.gov;doa.aogcc.prudhoe.bay@alaska.gov
OPERATOR:
FIELD /UNIT /PAD:
DATE:
OPERATOR REP:
AOGCC REP:
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
Mechanical Integrity Test
ConocoPhillips Alaska, Inc. ~~ l ~(lSl~
Kuparuk /KRU / CD1-11
06/26/08
Ives /Bates
4 Year State Waived MITIA
•
Packer De Pretest Initial 15 Min. 30 Min.
Well CD1-11 Type Inj. G TVD 6,748' Tubing 2,800 2,800 2,800 2,800 Interval 4
P.T.D. 2041800 Type test P Test psi 1687 Casing 1,530 /2,300 2,220 2,220 P/F P
Notes: OA 700 700 700 700
Well Type Inj. TVD Tubing Interval
P.T.D. Type test Test psi Casing P/F
Notes: OA
Well Type Inj. TVD Tubing Interval
P.T.D. Type test Test psi Casing P/F
Notes: OA
Well Type Inj. TVD Tubing Interval
P.T.D. Type test Test psi Casing P/F
Notes: OA
Well Type Inj. TVD Tubing Interval
P.T.D. Type test Test psi Casing P/F
Notes: OA
TYPE INJ Codes
D =Drilling Waste
G=Gas
I =Industrial Wastewater
N =Not Injecting
W =Water
TYPE TEST Codes
M =Annulus Monitoring
P =Standard Pressure Test
R = Internal Radioactive Tracer Survey
A =Temperature Anomaly Survey
D =Differential Temperature Test
INTERVAL Codes
I =Initial Test
4 =Four Year Cycle
V =Required by Variance
T =Test during Workover
O =Other (describe in notes)
MIT Report Form
BFL 11/27/07 MIT KRU CD1-11 06-26-O8.xls
Message
•
Maunder, Thomas E (DOA)
_.
•
From: Wiess, JORDAN F [JORDAN.F.Wiess@conocophillips.com]
Sent: Thursday, August 02, 2007 12:01 PM
To: Roby, David S(DOA); Uldrich, David O
Cc: Maunder, Thomas E(DOA); Wilson, Chris; Davies, Stephen F(DOA)
Subject: RE: AOGCC Guidance on Alpine Area Injection Order
Page 1 of ~ ~ .
Dave,
a-U~-r~~
As a result of receiving these interpretations, CPAI has initiated lean gas injection into CD1-02,
CD1-05 and CD1-21 (with CD1-06 and CD1-14 previously on lean gas injection). CD1-11 is
on long-term continuous miscible gas injection (no WAG) because it is twinned with CD1-05.
When it reaches the end of its miscible gas EOR service, it will be converted to continuous
lean gas injection as well. Also, after the facility shut down in August, CD2-06 and CD2-07 will
start on lean gas WAG.
Jordnn
~ ~~,
~:~~~~~~~ :~.f~G :a ~ 2D~}~
-----Origin al Message-----
From: Roby, David S (DOA) [mailto:dave.roby@alaska.gov]
Sent: Wednesday, August 01, 2007 3:45 PM
To: Wiess, JORDAN F; Uldrich, David O
Cc: Maunder, Thomas E(DOA); Wilson, Chris; Davies, Stephen F(DOA)
Subject: RE: AOGCC Guidance on Alpine Area Injection Order
Jordan,
One more thing, could you please tell us which three wells have been converted to lean gas injection, and
email us when wells are converted in the future, so that we can put a note in the appropriate well files?
Thanks again,
Dave Roby
Phone: 907-793-1232
email: dave ro~ alaska_gov
From: Wiess, JORDAN F [mailto:JORDAN.F.Wiess@conocophillips.com]
Sent: Wednesday, August O1, 2007 8:18 AM
To: Roby, David S(DOA); Uldrich, David 0
Cc: Maunder, Thomas E(DOA); Wilson, Chris; Davies, Stephen F(DOA)
Subject: RE: AOGCC Guidance on Alpine Area Injection Order
Dave R,
Dnve Uldrich is out of the office until mid/end of next week. I will ensure he provides you a prompt
reply upon his return.
Thnnks for your time last week.
~\~°~~ ~`~
Q ~~
8/17/2009
Message ~
~ Page 2 of ~
~--
Jordan
-----Original Message-----
From: Roby, David S (DOA) [mailto:dave.roby@alaska.gov]
Sent: Wednesday, August O1, 2007 8:15 AM
To: Uldrich, David 0
Cc: Maunder, Thomas E(DOA); Wilson, Chris; Wiess, JORDAN F; Davies, Stephen F(DOA)
Subject: RE: AOGCC Guidance on Alpine Area Injection Order
David,
I do have one request for you. During the meeting it was mentioned that normal laboratory testing
to demonstrate miscibility wasn't working because of the way the samples were obtained and
analyzed and that the MMP values that the lab determined were in error by several hundred psi.
Could you please provide a short note, an email would be fine, to explain these problems and what
you are doing to ensure miscibility?
Thanks in advance,
Dave Roby
Phone: 907-793-1232
email: dave,r~ a~alaskagov
From: Uldrich, David 0 [mailto:David.O.Uldrich@conocophillips.com]
Sent: Tuesday, July 31, 2007 4:46 PM
To: Roby, David S (DOA)
Cc: Maunder, Thomas E(DOA); Wilson, Chris; Wiess, JORDAN F
Subject: AOGCC Guidance on Alpine Area Injection Order
Dave:
I wanted to thank you and Tom very much for meeting with Jordan and myself last week. We
appreciate your time and efforts to clarify the issues that we raised through the draft request for
amendment of the Alpine area injection order. Naving confirmation from you that the existing area
injection order and State regulations permit post-MWAG lean gas injection, we are moving ahead
with the plans we discussed with you. As we discussed with you, CPAI believes that the injection of
lean gas in the post-MWAG injectors will enhance the recovery from the Alpine reservoir.
As a result of the guidance that we received from you and Tom on behalf of AOGCC, CPAI has
started lean gas injection into 3 wells that were previously used for miscible gas injection. These
conversions, and several others we intend to implement later this summer, will help us manufacture
gas that is miscible for the Alpine reservoir as well as the Fiord and Nanuq-Kuparuk reservoirs. In
addition, we anticipate that the expanded lean gas injection will generate increased recovery
through pressure maintenance and some reduced residual oil saturations.
Thanks again for you help.
David Uldrich
Staff Reservoir Engineer
Alpine Development Engineering
ATO-1766
ConocoPhillips Alaska Inc.
`ea~ (907) 265-6828
~ David.O.Uldrich@conocophillips.com
8/17/2009
• ~
r M ~..
MICROFILMED
03/01 /2008
DO NOT PLACE
_;`>
_r `s'
~..
~,
~;.
.:.
ANY NEW MATERIAL
UNDER THIS PAGE
F:\LaserFiche\CvrPgs_Inserts\Microfilm Maricer.c~c
.
.
~
ConocoPhillips
Alaska
V~ÙP ~t ~
P.O. BOX 100360
ANCHORAGE, ALASKA 99510-0360
i~~~.í:J ~& .~~~ c~Dl1;, ,coo.m~$,~1ill
o",r~Cì~ mr·Q! tin [;tI.m:s. !;OO:/fmi!§$1!J!T
i~wtáelH'
March 24, 2007
Mr. Tom Maunder
Alaska Oil & Gas Commission
333 West 7th Avenue, Suite 100
Anchorage, AK 99501
_ ~ CõÛ
dvD"t
Dear Mr. Maunder:
Enclosed please find a spreadsheet with a list of wells from the Alpine field (ALP). Some of
these well1) were found to have a void in the conductor by surface casing annulus. The voids that
were greater than 3 feet were first filled with cement to a level of approx. 1.0 foot. The
remaining volume of annular void respectively was coated with a corrosion inhibiter, RG2401
engineered to prevent water from entering the annular space. As per previous agreement with
the AOGCC, this letter and spreadsheet serves as notification that the treatments took place and
meets the requirements of form 10-404, Report of Sundry Operations.
The cement top-fill operation was completed on March 21st, 2007. Schlumberger Well Services
mixed 15.7 ppg Arctic set I in a blender tub. The cement was pumped into the conductor bottom
and cemented up via a hose run to the existing top of cement. The corrosion inhibitor sealant
was pumped in a similar manner March 21 st_ 22n ,2007. The attached spreadsheet presents the
well name, top of cement depth prior to filling, and volumes used on each conductor.
Please call Jerry Dethlefs or M.J. Loveland at 907-659-7043, if you have any qu~§.t!9ns.
Sincerely,
'»#
¡:: Arend-
ConocoPhillips Well Integrity Field Supervisor
~
~MAR 282007
.,... ~ ~ , -"...
Attachment
.
.
ConocoPhillips Alaska Inc.
Suñace Casing by Conductor Annulus Cement, Corrosion inhibitor, Sealant Top-off
Alpine Field
March 24,2007
Initial top of
Well Name PTD # cement
ft
Final top of Cement top off
cement date
ft
Corrosion
RG casing filler inhibitor! sealant
vol. date
al
.
.
ConocoPhillips Alaska Inc.
Suñace Casing by Conductor Annulus Cement, Corrosion inhibitor, Sealant Top-off
Alpine Field
March 24,2007
Initial top of
Well Name PTD # cement
ft
Final top of Cement top off
cement date
ft
Corrosion
RG casing filler inhibitor! sealant
vol. date
al
.
.
WELL LOG TRANSMITTAL
To: State of Alaska
Alaska Oil and Gas Conservation Comrn.
Attn.: Librarian
333 West 7th Avenue, Suite 100
Anchorage, Alaska 99501
November 15, 2006
RE: MWD Formation Evaluation Logs: CDI-07_PB2, CDI-08, CDl-11, CDI-12_Ll.
The technical data listed below is being submitted herewith. Please address any problems or
concerns to the attention of:
Rob Kalish, Sperry Drilling Services, 6900 Arctic Blvd., Anchorage, AK 99518
.......:.
CDI-07_PB2: U::I:~ ~ò"3-~~Š-- t:i /L.j(-Iò~
Digital Log Images:
50-103-20478-00, 71
CDI-08: 96L[-OS""'9 i1 t4L/~CANNED FEB 0 1 2007
Digital Log Images:
50-103-20489-00
1 CD Rom
1 CD Rom
CDl-11: U.:I:(!. gol....[- "2fO it 144D3
Digital Log Images:
50-103-20500-00
1 CD Rom
CDI-12 Ll:
Digital Log Images:
50-103-20501-00, 60
1 CD Rom
Jb'-/ .. gòS-
-1t L../L./ D<O
e-o<-/-'d3C)
I '-IL.../ D 7-
Co
--;;2 De-· c-
DATA SUBMITTAL COMPLIANCE REPORT
11/27/2006
Permit to Drill
Operator CONOCOPHILLlPS ALASKA INC
2041800
Well Name/No. COLVILLE RIV UNIT CD1-11
MD 15057
TVD 6984
Completion Status WAGIN
Current Status WAGIN
.~,,~-_.~._~--~--,._~.._..~,._--_.-...__.._-._-~-----
Completion Date 11/7/2004
5 c.t.¿ )..3 ö 'ìi-)..~ ~'1
API~O. 50-103-20500-00-00
~
-~-~~^'-,~._._---~-_.__._-~,-~-_.__.._--------,.._._-~-'_'-~-_'..--~,----------,..---
REQUIRED INFORMATION
-~~._.._-
Directional surv~
---===----------==---------===-------=---~-"- ~==:.:.=
Mud Log No
Samples No
---~---~--
~---
DATA INFORMATION
Types Electric or Other Logs Run: GR/Res
Well Log Information:
(data taken from Logs Portion of Master Well Data Maint
Logl Electr
Data Digital Dataset
Type Med/Frmt Number Name
~: Asc Directional Survey
Directional Survey
Asc Directional Survey
Directional Survey
r Cement Evaluation
I
ko 0 TfF 12957 Gamma Ray
..EÓ C Lis 13746 Induction/Resistivity
Log Log Run
Scale Media No
Interval OHI
Start Stop CH
0 15057
0 15057
0 15057
0 15057
11303 12092 Case
3309 14995 Open
3333 15057 Open
5 Blu
-,---_.__._-~-~-----~----~------_.....__._~--,-_._._.-._~~~
Well Cores/Samples Information:
Name
Interval
Start Stop
Sample
Set
Number Comments
Sent
Received
ADDITIONAL INFORMATION
Well Cored? Y ~
Daily History Received?
(3s/N
@N
Chips Received? -v+N-
Formation Tops
Analysis
Received?
'N1'\Í
_.~~
.~-
,'---
---.-
Comments:
Received Comments
-~~--'---"-I
IIFR I
IIFR I
MWD I
MWD I
I
.
12/21/2004
12/21/2004
12/21/2004
12/21/2004
111912005
CEMENT BOND
LOG/SCMT- ['
CB/PRESSITEMP
1/27/2005 GRlEWR4/ABIIROP/PWD/ I
GEO PILOT '
2/22/2006 ROP DGR EWR plus ,
~__ Graphi~________J
.
--'--~
DATA SUBMITTAL COMPLIANCE REPORT
11/27/2006
Permitto Drill 2041800
Well Name/No. COLVILLE RIV UNIT CD1·11
Operator CONOCOPHILLlPS ALASKA INC
API No. 50-103-20500-00-00
MD 15057
TVD 6984
Completion Status WAGIN
Current Status WAGIN
UIC Y
_.._~--~-~--,-~-,---_._~.- --------_._-------
~~----
--~---~-- Ñ' --~. -~. ---.---.-----
Date: ~ 'Õ 6o.J ~ t\ ~-P
Compliance Reviewed By:
.
.
.
.
WELL LOG TRANSMITTAL
To: State of Alaska
Alaska Oil and Gas Conservation Carom.
Attn.: Librarian
333 West th Ave., Suite 100
Anchorage, Alaska 99501
¡JiG j-Ü4--/ \'[)O
February 16, 2006
} ~ l 4-t;,
RE: MWD Formation Evaluation Logs CD 1-11,
The technical data listed below is being submitted herewith. Please address any problems or
concerns to the attention of:
Rob Kalish, Sperry Drilling Services, 6900 Arctic Blvd., Anchorage, AK 99518 907-273-3500
CDl-ll:
LAS Data & Digital Log Images:
50-103-20500-00
1 CD Rom
'\ "Q
~
2'1 ~~ID(o
Schlumberger
NO. 3602
Alaska Data & Consulting Services
2525 Gambe" Street, Suite 400
Anchorage, AK 99503-2838
ATTN: Beth
Company: State of Alaska
Alaska Oil & Gas Cons Comm
AUn: Helen Warman
333 West 7th Ave, Suite 100
Anchorage, AK 99501
Field: Prudhoe Bay, Milne Pt.
Well Job # Log Description Date BL Color CD
02-308 10980587 RST 07/17/05 1 1
PSI-07 10674389 RST 10/27/03 1 1
PSI-07 10679045 RST 12/26/03 1 1
L3-02 11072860 RST 06/13/05 1 1
X-16A 10980531 RST 03/01/05 1 1
F-30 10987523 RST 06/22/05 1 1
W-31 10913021 RST 06/30/05 1 1
Z-15 10980580 RST 07/10/05 1 1
C-30 10980583 RST 07/13/05 1 1
W-39A 10928650 MCNL 10/16/05 1 1
18-31A 10942210 MCNL 04/28/05 1 1
H-02A 10928622 MCNL 04/05/05 1 1
05-24A ;¿0.4 - 1 '80 10928609 MCNL *(PRINT SENT 1/24/05) . 12/22/04 1 13371
K-06A 11075903 MCNL 07/30/05 1 1
L-03 10913041 OH LDWG EDIT FOR WIRELlNE DATA 08/01/05 2 1 1
B-02A 10889169 SCMT 09/22/04 1
H-05 10674407 CBL 01/21/04 1
G-13A 10563175 SCMT 06/17/03 1
E-06A 11051045 SCMT 05/19/05 1
W-20 10672389 USIT 06/03/04 1
MPF-87A 10708043 USIT 01/08/04 1
MPA-03 11058243 USIT 09/07/05 1
MPF-89 11051088 USIT 08/17105 1
BP Exploration (Alaska) Inc.
Petrotechnical Data Center LR2-1
900 E. Benson Blvd.
Anchorage, Alaska 99508
Alaska Data & Consulting Services
2525 Gambell Street. Suite 400
Anchorage. AK 99503-2838
A TTN: Beth
R~Nodbyt~~!ð -
Date Delivered:
~\r\C ntbC V D \ I 8CC}:;;;
11/17/05
.
.
~.
;
MEMORANDUM
.
State of Alaska
.
Alaska Oil and Gas Conservation Commission
TO:
Jim Regg Ð d I
P.I. Supervisor 1)'1 ,··rlS fêJ 5
DA TE: Wednesday, March 23, 2005
SUBJECT: Mechanical Integrity Tests
CONOCOPHILLIPS ALASKA INC
CDl-11
COLVILLE RIV UNIT CD I-II
FROM:
John Spaulding
Petroleum Inspector
Src: Inspector
Reviewed By:
'T!'f.'_
P.I. Suprv -..J~-
Comm
NON-CONFIDENTIAL
Well Name: COLVILLE RIV UNIT CDI-I I API Well Number: 50-103-20500-00-00 Inspector Name: John Spaulding
Insp Num: miUS0503I9132035 Permit Number: 204- I 80-0 Inspection Date: 3/1712005
Rei Insp Num:
Packer Depth Pretest Initial 15 Min. 30 Min. 45 Min. 60 Min.
Well CDl-1I ¡Type Ioj. G ! TVD I 6749 ! IA I 700 I 2000 2000 I 2000 i I
P.T. 2041800 TypeTest SPT I Test psi I 1687.2S lOA ¡ I ! ¡ I
I
Interval INITAL PIF P Tubing i 1260 I 1260 I 1260 I 1260 ¡ I
Notes: Initial test. Very good reults.
Wednesday, March 23, 2005
Page! of!
.
Conoc6Phillips
.
G. C. Alvord
Alpine Drilling Team Leader
Drilling & Wells
P. O. Box 100360
Anchorage, AK 99510-0360
Phone: 907-265-6120
January 26, 2005
Commissioner
State of Alaska
Alaska Oil & Gas Conservation Commission
333 West ih Avenue Suite 100
Anchorage, Alaska 99501
2005
Subject: Well Completion Report for CD1-11 (#204-180)
Dear Commissioner:
ConocoPhillips Alaska, Inc. submits the attached Well Completion Report for the
recent drilling operations on the Alpine well CD1-11.
If you have any questions regarding this matter, please contact me at 265-6120.
Sincerely,
-zs--=-r) -v¡ ~
~
G. C. Alvord
Alpine Drilling Team Leader
CPAI Drilling and Wells
GCAlskad
n
\~}
t\L
! i . )nn·~
1a. Well Status: Oil 0 Gas U Plugged U Abandoned U Suspended U WAG 0 1 b. Well Class: ,.
20AAC 25.105 20AAC 25.110 DeveiÒprnerit .ŒJ tx~atpt)l,...,.C:L þi¡;:
GINJ 0 WlNJ 0 WDSPL 0 No. of Completions _ Other - Service 0 ,. $t;atigr~h;~'~~rJ'
2. Operator Name: 5. Date Comp., Susp., 12. Permit to Drill Number: .,...
/
ConocoPhillips Alaska, Inc. or Aband.: November 7,2004 204-1801
3. Address: 6. Date Spudded: 13. API Number:
/
P. O. Box 100360, Anchorage, AK 99510-0360 October 23, 2004 50-103-20500-00
4a. Location of Well (Governmental Section): 7. Date TD Reached: 14. Well Name and Number:
Surface: 293' FNL, 2502' FWL, Sec. 5, T11 N, R5E, UM November 5, 2004 ,/ CD1-11
At Top Productive 8. KB Elevation (ft): 15. Field/Pool(s):
Horizon: 827' FNL, 558' FEL, Sec. 9, T11 N, R5E, UM 36.5' RKB 1 56' AMSL Colville River Field
Total Depth: 9. Plug Back Depth (MD + ND): Alpine Oil Pool
1919' FSL, 854' FWL, Sec. 10, T11 N, R5E, UM 15057' MD /6984' TVD
4b. Location of Well (State Base Plane Coordinates): 10. Total Depth (MD + TVD): 16. Property Designation:
Surface: x- 385929 ' y- 5975834 ' Zone- 4 , 15057' MD 1 6984' TVD , ADL 025559, 372095
TPI: x- 393357 y- 5969911 Zone- 4 11. Depth where SSSV set: 17. Land Use Permit:
Total Depth: x- 394737 , y- 5967357 / Zone- 4 Landing Nipple @ 2326' ALK n/a
18. Directional Survey: Yes 0 NoU 19. Water Depth, if Offshore: 20. Thickness of
N/A feet MSL Permafrost: 1900' MD
21. Logs Run:
GRlRes
22. CASING, LINER AND CEMENTING RECORD
SETTING DEPTH MD SETTING DEPTH TVD HOLE AMOUNT
CEMENTING RECORD
CASING SIZE WT. PER FT. GRADE TOP BOTTOM TOP BOTTOM SIZE PULLED
16" 62.5# H-40 36.5' 114' 36.5' 114' 42" 10 cu yds Portland 1/1
9.625" 36# J-55 36.5' 3334' 36.5' 2368' 12.25" 430 sx AS Lite, 231 sx Class G
7" 26# L-80 36.5' 12293' 36.5' 6960' 8.5" 90 sx LiteCrete, 120 sx Class G
23. Perforations open to Production (MD + TVD of Top and Bottom 24. TUBING RECORD
Interval, Size and Number; if none, state "none"): SIZE DEPTH SET (MD) I PACKER SET
4.5" 11576' I 11505'
25. ACID, FRACTURE, CEMENT SQUEEZE, ETC.
/
open hole completion from 12293' to 15057' md DEPTH INTERVAL (MD) AMOUNT AND KIND OF MATERIAL USED
n/a
26. PRODUCTION TEST
Date First Injection Method of Operation (Flowing, gas lift, etc.)
January 26, 2005 , Injector
Date of Test Hours Tested Production for OIL-BBL GAS-MCF WA TER-BBL CHOKE SIZE GAS-OIL RATIO
Test Period -->
Flow Tubing Casing Pressure Calculated OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY - API (carr)
press. psi 24-Hour Rate -> not available
27. CORE DATA
Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water (attach separate sheet, if necessary).
Submit core chips; if none, state "none". 0,:,n '~!;TiÜ~!
.oJ
NONE RBDMS 8Ft FEF3 (} 2 2005
.&D
.. .~:~..: . "..,
..¿
GY
I STATE OF ALASKA ..
ALA KA OIL AND GAS CONSERVATION CO~SION
WELL COMPLETION OR RECOMPLETION REPORT ANDL(;)6
Form 10-407 Revised 12/2003
CONTINUED ON REVERSE
r~
",--I
28.
29.
GEOLOGIC MARKERS
FORMATION TESTS
NAME
MD
TVD
Include and briefly summarize test results. List intervals tested, and
attach detailed supporting data as necessary. If no tests were
conducted, state "None".
CD1-11
Seabee Form.
Nanushak
Gamma Ray Shale
Kalubik
Kuparuk Formation
Miluveach
Top Alpine 0
Top Alpine C
Base Alpine C
TO
3365'
5683'
11017'
11390'
11482'
11593'
12004'
12150'
13633'
15057'
2379'
3797'
6490'
6693'
6737'
6787'
6920'
6945'
6967'
6984'
N/A
30. LIST OF ATTACHMENTS
Summary of Daily Operations, Directional Survey, MIT
31. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Contact: Vern Johnson @ 265-6081
Printed Name ~ C. Alvord r-
Signature 7J..--..:- (ð -rJ-<.,
Title:
Phone
Alpine Drillina Team Leader
Date
¡/2cf"/DJ
.
Prepared by Sharon AlJsu~Drake
INSTRUCTIONS
General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and
leases in Alaska.
Item 1a: Classification of Service wells: Gas injection, water injection, Water-Alternating-Gas Injection, salt water disposal, water
supply for injection, observation, or Other. Multiple completion is defined as a well producing from more than one pool with
production from each pool completely segregated. Each segregated pool is a completion.
Item 4b: TPI (Top of Producing Interval).
Item 8: the Kelly Bushing elevation in feet abour mean low low water. Use same as reference for depth measurements given in other
spaces on this form and in any attachments.
Item 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00).
Item 20: True vertical thickness.
Item 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location
of the cementing tool.
Item 23: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item
23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to
be separately produced, showing the data pertinent to such interval).
Item 26: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection,
Shut-in, Other (explain).
Item 27: If no cores taken, indicate "none".
Item 29: List all test information. If none, state "None".
Form 10-407 Revised 12/2003
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
CD1-11
CD1-11
ROT - DRILLING
Doyon Drilling Inc
Doyon 19
Start:
Rig Release:
Rig Number:
10/22/2004
11/7/2004
19
Spud Date: 10/23/2004
End: 11/7/2004
Group:
10/22/2004 15:00 - 00:00 9.00 MOVE MOVE MOVE Disconnect & move pit & motor complexes - Split pit & motor
complexes - Move motor & pit complexes fl C02 -54 to CD1-11 & spot
on location - Move pipe shed - Skid rig floor & move off of C02-54 -
Move sub to CD1 - Sub @ runway @ OOOOhrs.
10/23/2004 00:00 - 08:30 8.50 MOVE MOVE MOVE Move subbase onto pad and over hole. Skid rig over hole - spot Pits
and Motor complexes - spot pipe shed - Ru mud, water and air lines.
Rig highline power on @ 0830 hours.
08:30 - 09:30 1.00 MOVE RURD MOVE RU - set in and evaluate riser - laid down riser for modification by
welder.
* Accepted rig @ 0900 hrs.
09:30 - 10:45 1.25 DRILL OTHR RIGUP PU mousehole - load drill pipe into shed - service Top Drive - take on
spud mud @ 1030 hrs.
10:45 - 11 :00 0.25 DRILL SFTY RIGUP Held Pre-Job safety meeting on picking up drill pipe.
11 :00 - 14:15 3.25 DRILL PULD RIGUP Pick up and stand back 72 joints of 5" drill pipe.
14:15 - 15:00 0.75 DRILL PULD RIGUP Pick up and stand back 12 jts of hwdp.
15:00 - 15:45 0.75 DRILL RIRD RIG UP PU and install riser - RU flowline, fill up line and turnbuckles.
15:45 - 17:00 1.25 DRILL PULD RIGUP Pick up and stand back 15 joints of hwdp (27 jts total)
Pu drilling jars and 2-8" nmdc's and stand back in derrick
17:00 - 19:00 2.00 DRILL PULD SURFAC MU BHA - bit, motor (1.83 bend) Float sub - String stab - MWD - UBHO
- Orient mule shoe - Plug in to program MWD
19:00 - 19:30 0.50 DRILL SFTY SURFAC Held pre-spud meeting with rig crew & service hands on rig
19:30 - 20:00 0.50 DRILL TRIP SURFAC Run -in w/2 NM flex De's & jars - tag ice plug @ 102' - fill hole wI mud
& check for leaks OK - Fill drill string & test mud lines to 4000 psi OK -
Clean out conductor f/102 'to 114'
20:00 - 00:00 4.00 DRILL DRLG SURFAC Spud in @ 2000 hrs.
Drill 12 1/4" hole f/114' to 570' MD 566' TVD
ADT - 1.1 hrs. = ART - .3 hrs. AST - .8 hrs.
RPM 50 WOB 6/30 k GPM 475 @ 1050 psi
String wt. PU 100 So 100 Rot 100
Torque onloff btm. - 5500/5000 ftllbs.
10/24/2004 00:00 - 12:00 12.00 DRILL DRLG SURFAC Drill 12 1/4" hole fl 570' to 2304' MD 1798' TVD
ADT - 7.0 hrs. = ART - 3.35 hrs. AST - 3.65 hrs.
RPM 60 WOB 15/35 k GPM 650 @ 2260 psi
String wt. PU 128 So 110 Rot 118
Torque on/off btm. - 8500/8000 ftllbs.
12:00 - 20:30 8.50 DRILL DRLG SURFAC Drill 12 1/4" hole f/2304' to 3343' MD 2368'TVD
ADT - 5.3 hrs. = ART - 4.34 hrs. AST - .96 hrs.
RPM - 70 WOB 20/45 k GPM 646 @ 2350 psi
String wt. PU 145 SO 115 Rot 125
Torque onloff btm. - 10,000/8,000 ftllbs.
20:30 - 21 :30 1.00 DRILL CIRC SURFAC Circulate hole clean for wiper trip - 2X btms up @ 670 gpm @ 2350 psi
wI 70 rpm - stood back 2 stds. while circulating
21 :30 - 23:15 1.75 DRILL TRIP SURFAC Wiper trip fl 3150' to 2170' - pumping 600 gpm wI 70 rpm's
23:15 - 00:00 0.75 DRILL CIRC SURFAC Circulate btms. up @ 600 gpm @ 1870 psi wi 70 rpm's
10/25/2004 00:00 - 01 :30 1.50 DRILL WIPR SURFAC Backream from 2170' to 1000' 480 gpm I 1330 psi 170 rpm
01 :30 - 03:00 1.50 DRILL WIPR SURFAC Flow check well, static. Orientate tools highside and RIH to 3260',
precaultionary wash and ream to 3343'.
03:00 - 04:00 1.00 DRILL CIRC SURFAC Circ and cond mud - 670 gpm I 2350 psi 170 rpm
Stood back 1 stand every 30 min. to 3160'
04:00 - 06:00 2.00 DRILL TRIP SURFAC POOH on trip tank from 3160' to 970' - hole taking proper fill.
06:00 - 06:30 0.50 DRILL OBSV SURFAC Flow check well, observed annulus percolating moderatly, fluid level
dropping slowly - 1 bbl in 20 min.
06:30 - 08:15 1.75 DRILL TRIP SURFAC Orientate tools highside - RIH for evaluation, precautionary wash and
Printed: 11/18/2004 4:03:55 PM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
CD1-11
CD1-11
ROT - DRILLING
Doyon Drilling Inc
Doyon 19
Start: 10/22/2004
Rig Release: 11/7/2004
Rig Number: 19
Spud Date: 10/23/2004
End: 11/7/2004
Group:
ream from 360' to 3343'.
Circ and condition mud 650 gpm 12330 psi / 70 rpm
Circulated 1.5 BU - no gas cut mud observed, zero LEL deteched at
possum belly. Final mud wt. 9.8 ppg in and out.
Flow check well, static. Pump out 5 stands to 2875', flow check well,
static.
POOH on trip tank from 2875' to 970' - hole took 8 bbls over calculated
pipe displacement, hole in good condition. Monitor well, static.
POOH - stood back hwdp and 8' nmdc's. Flush tools with fresh water -
Lay down MWD, Motor and bit. Clear tools from rig floor.
RU to run 9 5/8" casing
Held Pre-Job safety and Opts meeting with crew.
Run 9 5/8" 36# J-55 BTC casing as follows: FS, 2 jts. FC, 2 jts.
BakerLoc 1 st four connections - fill pipe - circ & check floats - 39 jts. to
1800' (43 jts. total)
Staged pumps up to 6 bpm - CBU - FCP = 370 psi
PUW 125K SOW 105K
Continue running 9 5/8" 36# J-55 BTC casing f/1800' as follows: ran 35
jts to 3295.59" ( 78 jts. total) - PU FMC fluted mandrel hanger & landing
jt. - land casing on landing ring wI shoe @ 3333.56' & FC @ 3244.73'
LD fill up tool & MU cement head & lines
Stage pumps up to 8.0 bpm - Circulate hole clean & condition mud for
cement job - FCP @ 400 psi - reciprocated pipe with full returns
throughout. Held PJSM
Cement 9 5/8" casing as follows: Pumped 40 bbls Biozan water wI nut
plug - Pump 5 bbls water fl Dowell - Test lines to 2700 psi - Drop btm
plug - Mix & pump 50 bbls Mud Push XL @ 10.5 ppg @ 5.5 bpm 1180
psi - Mix & pump lead slurry ASL @ 10.7 ppg @ 7.5 bpm 1228 - 160 psi
- Observed nut plug @ shakers w/310 bbls lead slurry pumped-
finished pumping down surge can - total of 340 bbls lead slurry -
switched to tail slurry - mixed & pumped 46.8 bbls of tail slurry Class G
wI 0-46 0.20 %,0650.30%, S001 2%, @ 15.8 ppg @ 5.5 bpm 1160
psi.
0.75 CEMEN DISP SURFAC Dropped top plug wI 20 bbls water fl Dowell - switched to rig pumps &
displaced cement wI 228.5 bbl - 9.6 ppg mud @ 7 bpm /460 to 570 psi
- full returns for 177 bbls -partial returns last 51.5 bbls - slowed rate to
5.0 bpm 1580 psi when retums diminished - slowed pumps to 4.0 bpm /
560 psi for last 8.5 bbls of displacement - bumped plug w/ 1180 psi -
had 52 bbls of 10.7 ppg cement returns to surface - check floats - floats
held - CIP @ 2355 hrs.
RU and test 9 5/8" casing to 2500 psi for 30 minutes. Bleed off test
pressure and blow down lines
RD cement head and casing equipment - LD landing joint.
RD riser and FMC speed adaptor.
Install FMC Unihead - test MIM seal to 1000 psi for 10 min.
NU BOP stack - change saver sub on Top Drive
Set test plug - RU to test BOPE - Test BOPE - pipe rams, blind rams,
choke & kill line valves, choke manifold valves, TO IBOP's, floor dart &
TIW valves to 250 psi & 5000 psi - Hydril to 250 & 3500 psi - performed
accumulator closure test - RD test euqipment - Pull test plug - set wear
bushing - Witnessing of test waived by Chuck Scheve AOGCC.
1.00 DRILL OTHR SURFAC LD long bails and Pu and install drilling bails on Top Drive - spot & RU
GeoSpan skid.
10/25/2004 06:30 - 08: 15 1.75 DRILL TRIP SURFAC
08:15 - 09:00 0.75 DRILL CIRC SURFAC
09:00 - 10:00 1.00 DRILL TRIP SURFAC
10:00 - 11 :45 1.75 DRILL TRIP SURFAC
11 :45 - 14:30 2.75 DRILL PULD SURFAC
14:30 - 15:45 1.25 CASE RURD SURFAC
15:45 - 16:00 0.25 CASE SFTY SURFAC
16:00 - 18:00 2.00 CASE RUNe SURFAC
18:00 - 18:30 0.50 CASE CIRC SURFAC
18:30 - 20:00 1.50 CASE RUNe SURFAC
20:00 - 20:30 0.50 CEMEN RURD SURFAC
20:30 - 22:00 1.50 CEMEN CIRC SURFAC
22:00 - 23:15 1.25 CEMEN PUMP SURFAC
23:15 - 00:00
10/26/2004 00:00 - 00:45 0.75 CASE DEQT SURFAC
00:45 - 01 :30 0.75 CASE RURD SURFAC
01 :30 - 02:30 1.00 CASE NUND SURFAC
02:30 - 03:30 1.00 CASE NUND SURFAC
03:30 - 05:00 1.50 WELCT NUND SURFAC
05:00 - 09:30 4.50 WELCT BOPE SURFAC
09:30 - 10:30
Printed: 11/18/2004 4:03:55 PM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
CD1-11
CD1-11
ROT - DRILLING
Doyon Drilling Inc
Doyon 19
Start:
Rig Release:
Rig Number:
10/22/2004
11/7/2004
19
Spud Date: 10/23/2004
End: 11/7/2004
Group:
10/26/2004 10:30 - 11 :00 0.50 RIGMNT RGRP SURFAC Complete repairs to drawworks disc brake system.
11 :00 - 23:30 12.50 DRILL PULD SURFAC Pick up 306 Jts. 4" drill pipe from shed and stood back in derrick.
23:30 - 00:00 0.50 RIGMNT RSRV SURFAC Slipped and cut drilling line.
10/27/2004 00:00 - 00:30 0.50 RIGMNT RSRV SURFAC Slip and cut drilling line
00:30 - 01 :00 0.50 DRILL PULD SURFAC POOH stand back 4" drill pipe
01 :00 - 01 :30 0.50 RIGMNT RSRV SURFAC Service Top Drive and Drawworks
01 :30 - 01 :45 0.25 DRILL OTHR SURFAC Preessure test GeoSpan skid to 4000 psi.
01 :45 - 02:15 0.50 RIGMNT RGRP SURFAC Repair actuator valve on Top Drive
02:15 - 05:00 2.75 DRILL PULD SURFAC MU BHA #2 - initialise LWD tools - RIH wi hwdp
05:00 . 07:30 2.50 DRILL PULD SURFAC PU 1 st ghost reamer and shallow test tools - RIH - picked up 69 joints
of 4" drill pipe to 3100'.
07:30 - 08:00 0.50 DRILL REAM SURFAC Wash down from 3100', break in GeoPilot bearing package - tag
cement @ 3204'.
08:00 - 09:30 1.50 CEMEN DSHO SURFAC Clean out to FC @ 3245', drill out FC, cement, FS and rat hole. Drilled
20' of new hole to 3363'. Circ clean for FIT 650 gpm 12750 psi 180 rpm
PUW 150K SOW 11 OK RWT 120K
09:30 - 10:15 0.75 CEMEN FIT SURFAC RU and perfom FIT to 17.9 ppg EMW - Blow down lines· RD.
10:15 - 10:30 0.25 DRILL CIRC INTRM1 Pumped 40 bbls high vis sweep and begin change over to 9.6 ppg
LSND mud
10:30 . 12:00 1.50 DRILL DRLG INTRM1 Drill 8 1/2" hole f/3363' to 3525' MD 2463 ' TVD
RPM 145 WOB 51 10 k GPM 670 @ 1640 psi
ADT= 0.7 hrs
String wt. PU 152 So 112 Rot 120
Torque onloff btm. - 9000/8000 ftIlbs.
12:00 - 00:00 12.00 DRILL DRLG INTRM1 Drill 81/2" hole f/3525' to 5061' MD 3418' TVD
RPM 170 WOB 5/15 k GPM 670 @ 2950 psi
ADT = 7.5 hrs
String wt. PU 165 So 110 Rot 130
Torque on/off btm. - 10000/8500 ftIlbs.
10/28/2004 00:00 - 12:00 12.00 DRILL DRLG INTRM1 Drill 8 1/2" hole fl 5061' to 6442' MD 4183 ' TVD
RPM 170 WOB 10/25 k GPM 670 @ 3120 psi
ADT = 8.04 hrs
String wt. PU 170 So 120 Rot 140
Torque onloff btm. - 10500/10000 ftIlbs.
12:00 - 19:00 7.00 DRILL DRLG INTRM1 Drill 8 1/2" hole f/6442' to 7397' MD 4622 ' TVD
RPM 160 WOB 15/25 k GPM 670 @ 3350 psi
ADT = 4.76 hrs
String wt. PU 200 So 120 Rot 145
Torque on/off btm. - 12000/11000 ftIlbs.
19:00 - 19:30 0.50 DRILL CIRC INTRM1 CBU.
19:30 - 22:30 3.00 DRILL TRIP INTRM1 Monitored well. POOH to 3200' on trip tank. Flow checked well at
casing shoe. Well had gas rolling in bell nipple but not flowing. MW cut
1.3 PPG. CBU well still rolling.
22:30 - 00:00 1.50 DRILL TRIP INTRM1 RIH to 4200'.
10/29/2004 00:00 . 01 :30 1.50 WELCT TRIP INTRM1 RIH from 4200' to 7397'.
01 :30 - 02:00 0.50 WELCT CIRC INTRM1 Circulated and raised MW to 9.8 PPG. Well static.
02:00 - 04:30 2.50 DRILL TRIP INTRM1 POOH to 5488' with pump @ 3 BPM. Flow checked well. Gas rolling
mud in bell nipple. Well not flowing.
04:30 . 05:30 1.00 DRILL CIRC INTRM1 CBU and monitered well. BU Mud gas cut 1.5 PPG to 8.3 PPG. Well
static.
05:30 - 07:30 2.00 DRILL TRIP INTRM1 POOH on trip tank to 3100'. Hole fill correct. Flow check Gas breaking
out of mud.
07:30 - 08:15 0.75 DRILL CIRC INTRM1 CBU and monitored well. Gas breaking out of mud but well not flowing.
Printed: 11/18/2004 4:03:55 PM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
CD1-11
CD1-11
ROT - DRILLING
Doyon Drilling Inc
Doyon 19
Start: 10/22/2004
Rig Release: 11/7/2004
Rig Number: 19
Spud Date: 10/23/2004
End: 11/7/2004
Group:
10/29/2004 08:15 - 10:00 1.75 DRILL TRIP INTRM1 POOH on trip tank to BHA. Hole fill correct.
10:00 - 12:30 2.50 DRILL PULD INTRM1 POOH BHA and changed out MWD. Made up new BHA and RIH.
12:30 - 14:30 2.00 DRILL TRIP INTRM1 RIH to 700' and tested MWD. RIH to 3329'.
14:30 - 15:00 0.50 DRILL CIRC INTRM1 CBU.
15:00 - 16:45 1.75 DRILL TRIP INTRM1 RIH to 7300'.
16:45-17:15 0.50 DRILL REAM INTRM1 Washed from 7300' to 7397' (MADD pass).
17:15 - 00:00 6.75 DRILL DRLG INTRM1 Drill 8 1/2" hole fl 7397' to 8162' MD 4995' TVD
RPM 170 WOB 15/30 k GPM 670 @ 3550 psi
ADT = 4.0 hrs
String wt. PU 220 So 120 Rot 150
Torque on/off btm. - 13500/12000 ftIIbs.
10/30/2004 00:00 - 12:00 12.00 DRILL DRLG INTRM1 Drill 8 1/2" hole f/8,162' to 9,780' MD 5,802' TVD
RPM 170 WOB 15/30 k GPM 668 @ 3750 psi
ADT= 7.74 hrs
String wt. PU 225 So 128 Rot 165
Torque on/off btm. . 16,000/15,500 Nibs.
ECD = 10.7 - 10.9 ppg
12:00 - 14:30 2.50 DRILL DRLG INTRM1 Drill 8 1/2" hole fl 9,780' to 10,100' MD 5982 ' TVD
RPM 170 WOB 15/35 k GPM 668 @ 3900 psi
ADT= 1.6 hrs
String wt. PU 225 So 128 Rot 165
Torque on/off btm. - 16,000/15,500 Nibs.
ECD = 10.7 - 10.9 ppg
14:30 - 16:45 2.25 RIGMNT RGRP INTRM1 Sheared two cylinder head flange bolts on pump #2, clyliner #3.
Circ and condition mud - 420 gpm 11560 psi 1100 rpm stood back 1
stand 1 hour. Repair #2 pump. RIH to 10070' - wash and ream to
10100'.
16:45 - 20:15 3.50 DRILL DRLG INTRM1 Drill from 10,100' to 10,370' MD 6,131 'TVD
RPM 160 WOB 10/18 k GPM 441 @ 1780 psi
ADT = 2.6 hrs
String wt. PU 245 So 128 Rot 165
Torque on/off btm. - 16,000/15,500 Nibs.
ECD = 10.3 - 10.6 ppg
20:15 - 00:00 3.75 DRILL DRLG INTRM1 Drill 8 1/2" hole f/10,370' to 10,733' MD 6,332' TVD
RPM 160 WOB 15/35 k GPM 668 @ 3450 psi
ADT = 2.00 hrs
String wt. PU 275 So 125 Rot 170
Torque on/off btm. - 16,500/16,000 Nibs.
ECD = 10.4 - 10.8 ppg
10/31/2004 00:00 - 12:00 12.00 DRILL DRLG INTRM1 Drill 8 1/2" hole fl 10,733' to 12,070 MD 6931' TVD
RPM 170 WOB 20/30 k GPM 600 @ 3970 psi
ADT= 7.42 hrs
String wt. PU 245 So 135 Rot 178
Torque on/off btm. - 15,500/15,000 Nibs.
ECD = 10.5 - 10.8 ppg
12:00 - 14:00 2.00 DRILL DRLG INTRM1 Drill 8 1/2" hole f/12070' to 12,306 MD 6960' TVD
RPM 170 WOB 10/15 k GPM 550 @ 3400 psi
ADT = 1.55 hrs
String wt. PU 250 So 130 Rot 175
Torque on/off btm. - 16,000/14,000 Nibs.
ECD = 10.5 - 10.8 ppg
14:00 - 15:30 1.50 DRILL CIRC INTRM1 Pumped 40 bbls high vis sweep - circulate and condition mud 2 x BU
620 gpm 1 3750 psi 1160 rpm
Printed: 11/18/2004 4:03:55 PM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
CD1-11
CD1-11
ROT - DRILLING
Doyon Drilling Inc
Doyon 19
Start:
Rig Release:
Rig Number:
10/22/2004
11/7/2004
19
Spud Date: 10/23/2004
End: 11/7/2004
Group:
10/31/2004 15:30 - 17:45 2.25 DRILL WIPR INTRM1 Backream from 12,306' to 10,990' - 550 gpm 13240 psi /120 rpm
17:45 - 18:30 0.75 DRILL WIPR INTRM1 RIH to 12,230' and washed to 12,306'.
18:30 - 20:00 1.50 DRILL CIRC INTRM1 Pumped 40 bbls high vis sweep - circulate and condition mud 2 x BU
620 gpm I 3750 psi /160 rpm
20:00 - 22:00 2.00 DRILL WIPR INTRM1 Backream from 12,306' to 10,990' - 550 gpm / 3240 psi /120 rpm
22:00 - 22:30 0.50 DRILL WIPR INTRM1 RIH to 12,230' attempted to screw in top drive and plug burned up.
22:30 - 00:00 1.50 DRILL CIRC INTRM1 RU cement hose and head pin. Circulated @ 9 BPM and raised MW to
9.8 PPG (Replacing plug on top drive while circulating.).
11/1/2004 00:00 - 01 :00 1.00 DRILL CIRC INTRM1 Circ through pump down hose @ 12,230' - reciprocate pipe - increased
mud wt to 9.8 ppg
380 gpm / 2040 psi.
01 :00 - 01 :45 0.75 DRILL CIRC INTRM1 Wash down from 12,229' to 12,306' - circ and condition mud - spot
casing pill to bit. 600 gpm I 3940 psi 1100 rpm
01 :45 - 03:30 1.75 DRILL TRIP INTRM1 Flow check well, static. Pump out from 12,306' to 10,988' spotting
casing pill @ 2 bpm. Flow check well, static
03:30 - 07:15 3.75 DRILL TRIP INTRM1 POOH on trip tand from 10,988' to 6219' - hole in good condition -
taking proper fill. Monitor well, gas breaking out of annulus - fluid level
dropping slowly.
07:15 - 07:45 0.50 DRILL TRIP INTRM1 Pump out from 6219' to 5834' - 450 gpm / 1910 psi /120 rpm
07:45 - 08:45 1.00 DRILL CIRC INTRM1 Circ BU - 600 gpm /2500 psi /120 rpm
Observed 9.8 ppg mud cut to 8.6 ppg @ BU.
08:45 - 09:00 0.25 DRILL TRIP INTRM1 RIH to 6315'.
09:00 - 11 :00 2.00 DRILL CIRC INTRM1 Circ and condition mud 590 gpm /2830/100 rpm - increase mud wt. to
10.5 ppg Monitor well, static.
11 :00 - 11 :45 0.75 DRILL TRIP INTRM1 Pump out from 6315' to 5934' - 450 gpm/1740 psi /100 rpm
Monitor well, static.
11 :45 - 15:30 3.75 DRILL TRIP INTRM1 POOH on trip tank from 5934' to 3262' - hole in good condition - taking
proper fill - Monitor well, static. Continue to POOH from 3262' to 706',
flow check well, static. Stand back hwdp and nmdc's.
15:30 - 16:45 1.25 DRILL PULD INTRM1 Down load LWD - Lay down bha: TM - HCIM - stab - LWD - Stab - GP
flex - Geo-Pilot - bit - Clear tools from rig floor.
16:45 - 17:30 0.75 DRILL PULD INTRM1 Cleared rig floor and laid down Geo Span.
17:30 - 19:00 1.50 WELCT EQRP INTRM1 Changed top rams to 7". Tested to 5000 PSI.
19:00 - 19:30 0.50 CASE RURD INTRM1 Rigged up casing tools to run 7" casing.
19:30 - 19:45 0.25 CASE SFTY INTRM1 PJSM.
19:45 - 00:00 4.25 CASE RUNC INTRM1 Ran 123 Jts 7" 26 # L 80 BTCM casing to 5205'.
11/2/2004 00:00 - 01 :00 1.00 CASE RUNC INTRM1 Ran 26 Jts 7" 26 # L 80 BTCM casing to 6314'.
01:00 - 02:15 1.25 CASE CIRC INTRM1 Circulated 240 Bbls. @ 5 BPM.
02:15 - 07:45 5.50 CASE RUNe INTRM1 Ran 110 Jts 7" 26 # L 80 BTCM casing to 11011'.
07:45 - 09:00 1.25 CASE CIRC INTRM1 Circulated and conditioned mud @ 3.7 BPM 460 PSI. Partial returns.
Lost 95 Bbls.
09:00 - 11 :15 2.25 CASE RUNe INTRM1 Ran 29 Jts 7" 26 # L 80 BTCM casing to 12,293". Landed casing on
hanger.
11: 15 - 11 :30 0.25 CASE RURD INTRM1 Rigged down circulating tool and rigged up cement head.
11 :30 - 15:30 4.00 CEMEN CIRC INTRM1 Circulated @ 4.5 BPM 490 PSI and lowered MW to 9.7 PPG.
15:30 - 18:30 3.00 CEMEN PUMP INTRM1 PJSM. Dowell pumped 5 Bbls. CW 100. Tested lines to 3700 PSI.
Pumped 55 Bbls CW 100 @ 4.5 BPM 500 PSI and dropped bottom
plug. Pumped 50 Bbls. Mud push XL 12.5 PPG @ 4.5 BPM 450 PSI.
Followed by 53 Bbls. Lite Crete mixed at 11 PPG. and 24 Bbls. of
Dowell INTER mixed at 15.8 PPG. Pumped at 4.5 BPM 500 PSI.
Dropped top plug and Dowell pumped 20 Bbls. water. Switched to Rig
Printed: 11/18/2004 4:03:55 PM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
CD1-11
CD1-11
ROT - DRILLING
Doyon Drilling Inc
Doyon 19
Start:
Rig Release:
Rig Number:
Spud Date: 10/23/2004
End: 11/7/2004
Group:
10/22/2004
11/7/2004
19
18:30 - 19:00
19:00 - 19:30
19:30 - 20:15
20:15 - 00:00
INTRM1
INTRM1
INTRM1
INTRM1
11/3/2004 00:00 - 00:45 0.75 CASE RURD INTRM1
00:45 - 03:30 2.75 DRILL PULD INTRM1
03:30 - 05:30 2.00 DRILL PULD INTRM1
05:30 - 06:30 1.00 RIGMNT RGRP INTRM1
06:30 - 07:00 0.50 DRILL PULD INTRM1
07:00 - 10:45 3.75 DRILL TRIP INTRM1
10:45 - 11 :45 1.00 RIGMNT RSRV INTRM1
11:45 -13:00 1.25 CASE CIRC INTRM1
13:00 - 14:00 1.00 CASE MIT INTRM1
14:00 - 16:00 2.00 CEMEN DSHO INTRM1
16:00 - 16:30 0.50 DRILL DRLH INTRM1
16:30 - 17:45
17:45 - 18:30
18:30 - 20:30
20:30 - 00:00
1.25 CEMEN
0.75 CEMEN
2.00 DRILL
3.50 DRILL
CIRC
FIT
CIRC
DRLH
11/4/2004
00:00 - 12:00
12.00 DRILL DRLH PROD
12:00 - 00:00
12.00 DRILL DRLH PROD
11/5/2004
00:00 - 12:00
12.00 DRILL DRLH PROD
INTRM1
INTRM1
PROD
PROD
Pump and displaced with 447 Bbls. 9.7 PPG mud at 4.5 BPM bumped
plug and CIP @ 1830 Hrs. 11/2104. Floats held and had good returns.
Rigged down Cement head and laid down landing joint.
Set and tested FMC packoff.
Changed top rams to VBR.
Set test plug - RU to test BOPE - Test BOPE - pipe rams, blind rams,
choke & kill line valves, choke manifold valves, TO IBOP's, floor dart &
TIW valves to 250 psi & 5000 psi - Hydril to 250 & 3500 psi - performed
accumulator closure test - RD test euqipment - Pull test plug - set wear
bushing - Witnessing of test waived by John Crisp AOGCC.
Installed wear bushing and changed bails and elevators.
Picked up BHA for 6 1/8th hole.
Picked up 4" DP from pipe shed and RIH to 2851'.
Repaired switch on Iron Roughneck.
Picked up 4" DP from pipe shed and RIH to 3990'.
RIH with pipe from derrick to 12,100'.
Slipped and cut drilling line.
Circulated and conditioned mud.
Rigged up and tested casing to 3500 PSI for 30 Min.
Tagged cement and drilled out shoe track to 12,293'. Stuck in float
collar and had to pull 375 K and work pipe free. Reamed Fe and no
other problems.
Drill 6 1/8" hole f/12306' to 12,326 MD 6960' TVD
RPM 60 WOB 5/10 k GPM 220 @ 1700 psi
ADT = .3 hrs
String wt. PU 215 So 130 Rot 170
Torque on/off btm. - 10,500/10,000 ftllbs.
Circulated for FIT.
Performed FITto 12.5 PPG EMW.
Displaced LSND mud with 9.1 PPG Flo Pro mud.
Drill 6 1/8" hole f/12326' to 12,481' MD 6959' TVD
RPM 60 WOB 5/10 k GPM 220 @ 1750 psi
ART = 1.41 hrs AST .61 hrs
String wt. PU 215 So 130 Rot 170
Torque on/off btm. - 10,500/10,000 ftllbs.
Note: AP gauge = 50 PSI @ 2300 Hrs.
Drill 6 1/8" hole f/12,481' to 13,172' MD 6962' TVD
RPM 60/90 WOB 5/10 k GPM 220 @ 2280 psi
ART= 4.77 hrs AST .93 hrs
String wt. PU 210 So 140 Rot 174
Torque on/off btm. - 12,000/10,500 ftllbs.
ECD 10.1
Drill 6 1/8" hole f/ 13,172' to 13,800' MD 6969' TVD
RPM 60/90 WOB 5/10 k GPM 233 @ 2510 psi
ART = 4.11 hrs AST 3.16 hrs
String wt. PU 210 So 135 Rot 170
Torque onloft btm. - 11,500/10,000 ftllbs.
Note: AP gauge = 550 PSI @ 2300 Hrs.
Drill 6 1/8" hole f/13,800' to 14,580' MD 6954' TVD
RPM 50/80 WOB 5/10 k GPM 220 @ 2350 psi
ART == 5.85 hrs AST 1.59 hrs
Printed: 11/18/2004 4:03:55 PM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
CD1-11
CD1-11
ROT - DRILLING
Doyon Drilling Inc
Doyon 19
Start: 10/22/2004
Rig Release: 11/7/2004
Rig Number: 19
Spud Date: 10/23/2004
End: 11/7/2004
Group:
1115/2004 00:00 - 12:00 12.00 DRILL DRLH PROD String WI. PU 210 So 135 Rot 173
Torque on/off btm. - 12,000/11,000 ftlbs.
12:00 - 19:00 7.00 DRILL DRLH PROD Dril/6 1/8" hole f/ 14,590' to 15,057' MD 6983' TVD .-
RPM 80 WOB 5/10 k GPM 220 @ 2470 psi
ART = 5.61 hrs AST .5 hrs
String WI. PU 215 So 132 Rot 170
Torque onloff btm. - 12,500/11,000 ft/lbs.
Note: AP gauge = 360 PSI @ 2400 Hrs.
19:00 - 22:00 3.00 DRILL CIRC PROD Circulated and conditioned mud while brine was being mixed and
delivered.
22:00 - 00:00 2.00 DRILL CIRC PROD Displaced well to 9.1 PPG Brine.
11/6/2004 00:00 - 01 :00 1.00 DRILL CIRC PROD Circulated 60 BPH loss. Spotted Flo Vis pill.
01:00 - 03:15 2.25 DRILL TRIP PROD Monitored well, loss 17 BPH. POOH to casing shoe.
03:15 - 05:30 2.25 DRILL TRIP PROD Monitored well, loss 12 BPH. POOH to 9,239'.
05:30 - 14:30 9.00 DRILL PULD PROD POOH laid down 179 Jts. DP. Laid down BHA.
14:30 - 15:30 1.00 CMPL TN RURD CMPL TN Pulled wear ring. Rigged up to run tubing.
15:30 - 20:00 4.50 CMPL TN RUNT CMPL TN Ran completion on 4.5" tubing to 4,180'. Laid down 7 Jts. bad tubing.
20:00 - 21 :30 1.50 CMPL TN OTHR CMPL TN Inspected and cleaned tubing. Found sand in dope of some boxes.
Started cleaning boxes on the fly.
21 :30 - 00:00 2.50 CMPL TN RUNT CMPL TN Ran completion on 4.5" tubing to 5,650'. Cleaning boxes on rack.
11m2004 00:00 - 04:30 4.50 CMPL TN RUNT CMPL TN RIH w/4 1/2" 12.6# L-80 IBTM tbg from 5650' to 11,544'. MU hanger .-
and land tbg at 11,576'.
04:30 - 05:00 0.50 CMPL TN OTHR CMPL TN Run in and torque lock down screws and gland nuts.
05:00 - 05:30 0.50 CMPL TN SEQT CMPL TN Install TWC. Test MTM hanger seals to 5000 psi. Had small leak by
upper MTM seal.
05:30 - 10:45 5.25 CMPL TN SEQT CMPL TN Remove TWC. Pull hanger to floor. Inspect seals. No visable damage.
Replace hanger and reland.Test MTM hanger seals to 5000 psi with
same results. Suspect damage to wellhead bore. Replace hanger with
a hanger dressed with elastomer seals. Reland and test to 5000 psi.
OK.
10:45 - 13:00 2.25 CMPL TN NUND CMPL TN PJSM. NO BOP. Remove mouse hole, turn buckles and flow line. "
13:00 - 15:00 2.00 CMPL TN NUND CMPL TN Nippled up tree and tested to 5000 PSI. /
15:00 - 19:00 4.00 CMPL TN FRZP CMPL TN Rigged up and pumped 165 Bbls. 9.3 PPG brine followed by 226 Bbls.
diesel. Pumped @ 3 BPM. by Dowell.
19:00 - 21 :30 2.50 CMPL TN DEQT CMPL TN Rigged up lubracator and dropped rod/ball. Tested lines to 4500 PSI.
Pressured tubing to 4200 PSI and set packer. Tested tubing to 4200
PSI for 30 Min. Bled tubing to 700 PSI and tested annulus to 3500 PSI
for 30 Min. Bled Annulus to 0 and left 700 PSI on tubing.
21 :30 - 22:00 0.50 CMPL TN RURD CMPL TN Sucked diesel out of lines and rigged down displacement manifold.
22:00 - 23:00 1.00 CMPL T RURD CMPL TN Set back pressure valve and secured well.
23:00 - 00:00 1.00 CMPL TN OTHR MOVE Prep Rig to move while Ball mill injecting pit reinse.
Printed: 11/18/2004 4:03:55 PM
.
.
08-Dec-04
AOGCC
Robin Deason
333 W. 7th Ave. Suite 100
Anchorage, AK 99501
DEFINITIVE
Re: Distribution of Survey Data for Well CD1-11
Dear Dear Sir/Madam:
Enclosed are two survey hard copies and one disk with the *.PTT and *.PDF
files.
Tie-on Survey:
Window / Kickoff Survey:
Projected Survey:
0.00' MD
0.00' MD
15,057.00' MD
(if applicable)
PLEASE ACKNOWLEDGE RECEIPT BY SENDING AN EMAIL TO
CARL.ULRICH@HALLlBURTON.COM OR SIGNING AND
RETURNING A COPY OF THE TRANSMITTAL LETTER TO THE
ATTENTION OF:
Sperry-Sun Drilling Services
Attn: Carl Ulrich
6900 Arctic Blvd.
Anchorage, AK 99518
Date ) } þu.. ~ ''1
2?l~ A
f . .' IÎ
Signed / : OiLJ(
I ,
Please call me at 273-3545 if you have any questions or concerns.
Regards,
William T. Allen
Survey Manager
Attachment(s)
Äüv{- rt 0
Halliburton Sperry-Sun
Alaska North Slope
North Slope, Alaska
CD1-11
Job No. AKZZ349027, Surveyed: 5 November, 2004
Survey Report
7 December, 2004
Your Ref: AP/501032050000
Surface Coordinates: 5975834.23 N, 385929.27 E (70020' 34.2161" N, 150055' 32.9021" W)
Grid Coordinate System: NAD27 Alaska State Planes, Zone 4
Kelly Bushing E/evation: 55. 98ft above Mean Sea Level
SPE!'r"'r"'Y-SU:f1
bFttL.LtNG $e~.Vtc:e$
A Halliburton Company
DEFJ
'riVE
.
.
Survey Ref: svy452
Halliburton Sperry-Sun
Survey Report for CD1-11
Your Ref: AP/501032050000
Job No. AKZZ349027, Surveyed: 5 November, 2004
A/aska North Slope North Slope, A/aska
Measured True Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft)
0.00 0.000 0.000 -55.98 0.00 0.00 N 0.00 E 5975834.23 N 385929.27 E 0.00 CB-SS-Gyro
84.00 0.250 55.000 28.02 84.00 0.11 N 0.15 E 5975834.33 N 385929.42 E 0.298 0.03
169.00 1.050 135.000 113.01 168.99 0.34 S 0.85 E 5975833.88 N 385930.12 E 1.219 0.85
258.00 5.000 124.000 201.87 257.85 3.09 S 4.65 E 5975831.07 N 385933.87 E 4.466 5.48
348.00 8.300 136.000 291.26 347.24 9.95 S 12.41 E 5975824.09 N 385941.53 E 3.959 15.84
437.00 10.700 139.000 379.03 435.01 20.81 S 22.30 E 5975813.08 N 385951.25 E 2.753 30.50 .
527.00 12.100 139.000 467.26 523.24 34.24 S 33.97 E 5975799.48 N 385962.71 E 1.556 48.22
617.00 13.800 135.000 554.96 610.94 48.95 S 47.75 E 5975784.56 N 385976.27 E 2.134 68.35
706.00 15.700 132.000 641.03 697.01 64.51 S 64.20 E 5975768.75 N 385992.48 E 2.300 91.00 MWD+IIFR+MS+8AG
745.15 16.770 132.110 678.62 734.60 71.84 S 72.33 E 5975761.29 N 386000.50 E 2.734 101.94
833.22 20.000 130.740 762.18 818.16 90.20 S 93.17 E 5975742.62 N 386021.06 E 3.700 129.68
924.01 23.970 124.080 846.37 902.35 110.68 S 120.23 E 5975721.74 N 386047.80 E 5.157 163.36
1019.31 29.400 126.110 931.49 987.47 135.33 S 155.18 E 5975696.56 N 386082.38 E 5.777 205.63
1114.13 35.020 129.160 1011.69 1067.67 166.25 S 195.12 E 5975665.03 N 386121.84 E 6.168 255.83
1209.43 39.080 126.500 1087.73 1143.71 201.408 240.49 E 5975629.19 N 386166.67 E 4.579 312.88
1304.89 42.420 126.710 1160.04 1216.02 238.56 S 290.50 E 5975591.28 N 386216.11 E 3.502 374.66
1400.01 45.050 127.200 1228.76 1284.74 278.09 S 343.04 E 5975550.95 N 386268.04 E 2.788 439.91
1493.94 49.690 127.470 1292.36 1348.34 320.00 S 397.97 E 5975508.21 N 386322.33 E 4.944 508.53
1589.69 52.650 127.290 1352.39 1408.37 365.28 S 457.24 E 5975462.04 N 386380.90 E 3.095 582.60
1684.69 55.090 128.170 1408.40 1464.38 412.23 S 517.91 E 5975414.16 N 386440.85 E 2.675 658.86
1778.27 54.580 127.780 1462.30 1518.28 459.31 S 578.21 E 5975366.18 N 386500.43 E 0.643 734.93
1875.08 53.470 127.770 1519.17 1575.15 507.30 S 640.14 E 5975317.25 N 386561.62 E 1.147 812.81
1970.40 54.520 125.720 1575.20 1631.18 553.42 S 701.93 E 5975270.20 N 386622.70 E 2.059 889.29 .
2065.42 56.380 125.370 1629.09 1685.07 598.91 S 765.61 E 5975223.74 N 386685.67 E 1.981 966.68
2160.92 59.520 125.090 1679.76 1735.74 645.59 S 831.72 E 5975176.05 N 386751.07 E 3.297 1046.66
2256.14 59.590 124.590 1728.01 1783.99 692.49 S 899.09 E 5975128.14 N 386817.72 E 0.459 1127.69
2351.60 59.930 125.060 1776.09 1832.07 739.59 S 966.79 E 5975080.02 N 386884.70 E 0.555 1209.10
2446.49 57.700 125.720 1825.22 1881.20 786.59 8 1032.97 E 5975032.01 N 386950.15 E 2.424 1289.34
2541.43 57.120 125.340 1876.36 1932.34 833.08 S 1098.07 E 5974984.54 N 387014.53 E 0.698 1368.45
2637.37 56.390 124.300 1928.95 1984.93 878.90 8 1163.93 E 5974937.72 N 387079.70 E 1.184 1447.65
2732.69 56.040 123.550 1981.96 2037.94 923.118 1229.67 E 5974892.51 N 387144.75 E 0.750 1525.64
2827.77 56.760 126.020 2034.58 2090.56 968.29 S 1294.70 E 5974846.35 N 387209.09 E 2.292 1603.79
2922.59 56.230 125.860 2086.92 2142.90 1014.708 1358.71 E 5974798.98 N 387272.38 E 0.576 1682.06
3016.93 56.240 128.250 2139.36 2195.34 1061.95 S 1421.29 E 5974750.78 N 387334.24 E 2.106 1759.90
3112.16 57.530 129.400 2191.39 2247.37 1111.968 1483.43 E 5974699.83 N 387395.61 E 1.691 1839.33
7 December, 2004 - 14:05
Page 20f7
DríllQuest 3.03.06.006
Halliburton Sperry-Sun
Survey Report for CD1-11
Your Ref: API 501032050000
Job No. AKZZ349027, Surveyed: 5 November, 2004
Alaska North Slope North Slope, Alaska
Measured True Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft)
3208.05 58.560 128.980 2242.14 2298.12 1163.37 S 1546.49 E 5974647.47 N 387457.87 E 1.137 1920.39
3292.10 58.640 128.230 2285.93 2341.91 1208.13 S 1602.55 E 5974601.86 N 387513.25 E 0.768 1991.81
3362.04 58.900 128.170 2322.19 2378.17 1245.11 S 1649.55 E 5974564.16 N 387559.68 E 0.379 2051.30
3457.74 58.340 128.310 2372.02 2428.00 1295.68 S 1713.72 E 5974512.62 N 387623.07 E 0.598 2132.58
3553.30 57.400 129.280 2422.84 2478.82 1346.38 S 1776.79 E 5974460.97 N 387685.37 E 1.306 2213.17
3648.57 56.570 129.050 2474.75 2530.73 1396.83 S 1838.73 E 5974409.58 N 387746.53 E 0.894 2292.76 .
3744.00 55.680 128.720 2527.94 2583.92 1446.57 S 1900.40 E 5974358.91 N 387807.44 E 0.976 2371.67
3839.30 54.740 128.500 2582.32 2638.30 1495.41 S 1961.56E 5974309.14 N 387867.84 E 1.004 2449.58
3934.81 53.690 128.770 2638.17 2694.15 1543.78S 2022.08 E 5974259.86 N 387927.62 E 1.123 2526.72
4030.57 52.820 128.900 2695.45 2751.43 1591.90 S 2081.85 E 5974210.84 N 387986.65 E 0.915 2603.13
4125.92 51.840 128.630 2753.72 2809.70 1639.16 S 2140.70 E 5974162.69 N 388044.78 E 1.052 2678.28
4221.43 51.060 129.580 2813.24 2869.22 1686.27 S 2198.66 E 5974114.70N 388102.02 E 1.128 2752.70
4316.43 50.610 129.310 2873.24 2929.22 1733.06 S 2255.54 E 5974067.05 N 388158.18 E 0.522 2826.12
4412.25 49.150 129.520 2934.99 2990.97 1779.59 S 2312.15 E 5974019.67 N 388214.07 E 1.533 2899.15
4507.22 49.050 131.080 2997.17 3053.15 1826.01 S 2366.89 E 5973972.42 N 388268.10 E 1.246 2970.77
4602.62 49.140 131.820 3059.64 3115.62 1873.74 S 2420.93 E 5973923.87 N 388321.41 E 0.594 3042.80
4698.36 48.640 132.620 3122.59 3178.57 1922.21 S 2474.35 E 5973874.59 N 388374.09 E 0.818 3114.90
4793.57 50.290 132.440 3184.46 3240.44 1971.12S 2527.68 E 5973824.87 N 388426.66 E 1.739 3187.23
4889.03 49.280 131.750 3246.10 3302.08 2019.99 S 2581.77 E 5973775.19 N 388480.00 E 1.193 3260.08
4984.81 50.270 132.650 3307.95 3363.93 2069.11 S 2635.94 E 5973725.25 N 388533.42 E 1.258 3333.17
5079.78 50.090 132.080 3368.77 3424.75 2118.27 S 2689.83 E 5973675.28 N 388586.56 E 0.498 3406.08
5175.39 49.810 133.630 3430.29 3486.27 2168.04 S 2743.48 E 5973624.69 N 388639.44 E 1.275 3479.25
5270.38 50.520 133.310 3491.14 3547.12 2218.22 S 2796.42 E 5973573.71 N 388691.61 E 0.791 3552.19 .
5366.03 52.290 131.850 3550.81 3606.79 2268.79 S 2851.47 E 5973522.31 N 388745.88 E 2.202 3626.91
5461.27 52.830 131.110 3608.71 3664.69 2318.88S 2908.12 E 5973471.37 N 388801.77 E 0.838 3702.46
5556.56 53.060 131.880 3666.13 3722.11 2369.26 S 2965.08 E 5973420.13 N 388857.95 E 0.689 3778.43
5651.97 54.360 131.430 3722.60 3778.58 2420.37 S 3022.54 E 5973368.15 N 388914.63 E 1.415 3855.26
5747.42 56.110 131.850 3777.02 3833.00 2472.47 S 3081.13 E 5973315.16 N 388972.43 E 1.869 3933.60
5840.98 59.690 129.500 3826.74 3882.72 2524.09 S 3141.25 E 5973262.63 N 389031.75 E 4.378 4012.70
5938.93 59.230 128.230 3876.51 3932.49 2577.03 S 3206.93 E 5973208.70 N 389096.62 E 1.211 4096.71
6033.63 60.330 128.100 3924.17 3980.15 2627.59 S 3271.27 E 5973157.17 N 389160.18 E 1.168 4178.11
6129.09 60.780 125.160 3971.11 4027.09 2677.18S 3337.97 E 5973106.57 N 389226.12 E 2.723 4260.53
6224.55 60.350 124.110 4018.02 4074.00 2724.43 S 3406.37 E 5973058.28 N 389293.79 E 1.059 4342.55
6319.80 59.850 123.570 4065.50 4121.48 2770.41 S 3474.96 E 5973011.26 N 389361.67 E 0.719 4423.81
6412.46 60.340 123.640 4111 .70 4167.68 2814.87 S 3541.85 E 5972965.79 N 389427.88 E 0.533 4502.80
7 December, 2004 - 14:05
Page 3 of 7
DrillQuest 3.03.06.006
Halliburton Sperry-Sun
Survey Report for CD1-11
Your Ref: API 501032050000
Job No. AKZZ349027, Surveyed: 5 November, 2004
Alaska North Slope North Slope, Alaska
Measured True Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft)
6510.87 62.890 127.220 4158.49 4214.47 2865.07 S 3612.36 E 5972914.53 N 389497.62 E 4.117 4588.38
6606.45 62.870 125.550 4202.06 4258.04 2915.53 S 3680.84 E 5972863.03 N 389565.32 E 1.555 4672.69
6702.16 62.740 123.870 4245.81 4301.79 2964.00 S 3750.82 E 5972813.50 N 389634.55 E 1.567 4756.68
6797.60 62.090 123.310 4290.00 4345.98 3010.80 S 3821.28 E 5972765.63 N 389704.30 E 0.857 4839.87
6893.22 61.820 123.010 4334.96 4390.94 3056.96 S 3891.93 E 5972718.40 N 389774.24 E 0.395 4922.74
6987.84 62.640 121.740 4379.05 4435.03 3101.79S 3962.64 E 5972672.50 N 389844.25 E 1.470 5004.73 .
7083.99 62.960 122.450 4423.00 4478.98 3147.23 S 4035.09 E 5972625.97 N 389916.00 E 0.736 5088.39
7179.25 63.090 122.000 4466.21 4522.19 3192.50 S 4106.90 E 5972579.61 N 389987.12 E 0.443 5171.49
7275.04 62.660 121.790 4509.88 4565.86 3237.54 S 4179.29 E 5972533.47 N 390058.81 E 0.489 5254.83
7369.39 61.390 121.780 4554.14 4610.12 3281.43 S 4250.11 E 5972488.51 N 390128.96 E 1.346 5336.25
7465.01 60.920 122.600 4600.27 4656.25 3326.05 S 4321.00 E 5972442.82 N 390199.16 E 0.898 5418.22
7560.25 60.480 122.870 4646.88 4702.86 3370.96 S 4390.86 E 5972396.85 N 390268.33 E 0.524 5499.66
7655.82 60.670 123.990 4693.83 4749.81 3416.82S 4460.33 E 5972349.94 N 390337.09 E 1.040 5581.48
7751.29 60.410 124.310 4740.79 4796.77 3463.48 S 4529.12 E 5972302.23 N 390405.16 E 0.399 5663.36
7847.00 61.090 124.030 4787.55 4843.53 3510.38 S 4598.21 E 5972254.28 N 390473.53 E 0.755 5745.63
7942.11 60.930 124.410 4833.65 4889.63 3557.17 S 4667.00 E 5972206.46 N 390541.61 E 0.388 5827.60
8037.52 61.240 123.710 4879.78 4935.76 3603.94 S 4736.19E 5972158.64 N 390610.07 E 0.720 5909.85
8132.68 60.770 123.630 4925.91 4981.89 3650.09 S 4805.46 E 5972111.44 N 390678.63 E 0.499 5991.72
8228.46 60.560 123.810 4972.83 5028.81 3696.44 S 4874.91 E 5972064.04 N 390747.37 E 0.274 6073.87
8324.04 60.130 123.250 5020.12 5076.10 3742.32 S 4944.15 E 5972017.11 N 390815.90 E 0.679 6155.53
8419.03 59.980 124.480 5067.54 5123.52 3788.19 S 5012.49 E 5971970.21 N 390883.54 E 1.133 6236.54
8514.58 60.290 125.900 5115.12 5171.10 3835.94 S 5080.21 E 5971921.44 N 390950.52 E 1.329 6318.41
8610.02 61.030 123.390 5161.89 5217.87 3883.22 S 5148.65 E 5971873.11 N 391018.24 E 2.420 6400.48 .
8705.09 60.560 124.090 5208.28 5264.26 3929.31 S 5217.66 E 5971825.98 N 391086.53 E 0.811 6482.13
8800.29 61.190 122.620 5254.62 5310.60 3975.03 S 5287.12 E 5971779.21 N 391155.29 E 1.502 6563.84
8895.34 60.900 123.430 5300.63 5356.61 4020.36 S 5356.85 E 5971732.83 N 391224.33 E 0.806 6645.47
8990.71 61.020 123.560 5346.93 5402.91 4066.37 S 5426.38 E 5971685.76 N 391293.15 E 0.173 6727.44
9085.93 60.490 124.610 5393.45 5449.43 4112.93 S 5495.19 E 5971638.16 N 391361.24 E 1.112 6809.27
9181.12 60.480 126.560 5440.35 5496.33 4161.13 S 5562.56 E 5971588.94 N 391427.86 E 1.783 6891.20
9274.33 60.550 125.620 5486.23 5542.21 4208.93 S 5628.12 E 5971540.15 N 391492.70 E 0.881 6971.56
9372.02 60.460 126.360 5534.32 5590.30 4258.89 S 5696.92 E 5971489.15 N 391560.73 E 0.666 7055.75
9467.48 59.810 126.340 5581.86 5637.84 4307.96 S 5763.59 E 5971439.07 N 391626.65 E 0.681 7137.78
9562.65 58.980 126.810 5630.31 5686.29 4356.77 S 5829.38 E 5971389.27 N 391691.68 E 0.970 7219.00
9658.08 57.900 127.310 5680.26 5736.24 4405.77 S 5894.27 E 5971339.28 N 391755.81 E 1.217 7299.71
9753.35 56.450 128.540 5731.90 5787.88 4454.97 S 5957.42 E 5971289.13 N 391818.21 E 1.869 7379.30
7 December, 2004 - 14:05
Page 4 of7
Dri/lQuest 3.03.06.006
Halliburton Sperry-Sun
Survey Report for CD1-11
Your Ref: AP/501032050000
Job No. AKZZ349027, Surveyed: 5 November, 2004
Alaska North Slope North Slope, Alaska
Measured True Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft)
9847.79 55.750 129.140 5784.57 5840.55 4504.12 S 6018.47 E 5971239.05 N 391878.51 E 0.910 7457.36
9943.85 55.250 128.880 5838.98 5894.96 4553.96 S 6079.99 E 5971188.29 N 391939.26 E 0.566 7536.22
10038.88 56.290 129.900 5892.44 5948.42 4603.82 S 6140.70 E 5971137.51 N 391999.21 E 1.40g 7614.53
10133.95 56.430 128.770 5945.11 6001.09 4653.98 S 6201.92 E 5971086.41 N 392059.66 E 1.000 7693.41
10229.51 56.430 128.020 5997.95 6053.93 4703.44 S 6264.32 E 5971036.02 N 392121.30 E 0.654 7772.64
10325.16 56.300 127.980 6050.93 6106.91 4752.46 S 6327.08 E 5970986.04 N 392183.30 E 0.140 7851.84 .
10420.47 56.510 126.620 6103.67 6159.65 4800.57 S 6390.23 E 5970936.98 N 392245.71 E 1.209 7930.67
10515.85 56.240 125.460 6156.48 6212.46 4847.30 S 6454.45 E 5970889.28 N 392309.21 E 1.052 8009.32
10611.00 56.600 126.530 6209.11 6265.09 4893.89 S 6518.58 E 5970841.72 N 392372.63 E 1.010 8087.81
10706.96 56.660 125.690 6261.90 6317.88 4941 .12 S 6583.32 E 5970793.51 N 392436.65 E 0.734 8167.18
10800.97 56.350 125.630 6313.78 6369.76 4986.82 S 6647.02 E 5970746.85 N 392499.64 E 0.334 8244.74
10897.90 56.170 125.760 6367.61 6423.59 5033.85 S 6712.48 E 5970698.82 N 392564.38 E 0.217 8324.49
10993.29 56.360 124.850 6420.59 6476.57 5079.69 S 6777.22 E 5970652.00 N 392628.41 E 0.818 8402.89
11088.57 56.210 126.230 6473.48 6529.46 5125.76 S 6841.71 E 5970604.96 N 392692.19 E 1.215 8481.27
11183.94 56.180 127.370 6526.54 6582.52 5173.23 S 6905.16 E 5970556.53 N 392754.91 E 0.994 8559.88
11279.38 57.550 129.810 6578.71 6634.69 5223.08 S 6967.61 E 5970505.73 N 392816.60 E 2.577 8639.43
11375.01 58.850 131.550 6629.11 6685.09 5276.06 S 7029.24 E 5970451.82 N 392877.41 E 2.059 8720.56
11470.19 61.840 134.110 6676.20 6732.18 5332.30 S 7089.86 E 5970394.67 N 392937.18 E 3.915 8803.23
11565.84 64.280 135.270 6719.53 6775.51 5392.27 S 7150.47E 5970333.78 N 392996.86 E 2.771 8888.49
11661.31 67.090 134.470 6758.84 6814.82 5453.64 S 7212.13 E 5970271.48 N 393057.58 E 3.041 8975.47
11756.91 69.160 137.660 6794.47 6850.45 5517.52 S 7273.66 E 5970206.67 N 393118.13 E 3.778 9064.11
11852.57 72.380 138.240 6825.97 6881.95 5584.59 S 7334.14 E 5970138.69 N 393177.59 E 3.414 9154.21
11947.71 76.240 139.750 6851.69 6907.67 5653.70 S 7394.22 E 5970068.67 N 393236.60 E 4.335 9245.45 .
12043.36 79.700 141 .090 6871.63 6927.61 5725.79 S 7453.81 E 5969995.68 N 393295.09 E 3.868 9338.40
12137.25 81.760 144.080 6886.75 6942.73 5799.38 S 7510.09 E 5969921.24 N 393350.25 E 3.833 9430.02
12201.04 82.680 146.100 6895.39 6951.37 5851.21 S 7546.26 E 5969868.87 N 393385.62 E 3.453 9492.05
12275.40 85.620 149.830 6902.97 6958.95 5913.90 S 7585.48 E 5969805.59 N 393423.89 E 6.366 9563.83
12344.06 87.350 149.900 6907.18 6963.16 5973.17 S 7619.88 E 5969745.80 N 393457.38 E 2.522 9629.76
12439.99 84.500 149.330 6914.00 6969.98 6055.71 S 7668.28 E 5969662.54 N 393504.52 E 3.029 9721.93
12534.95 86.600 150.250 6921.36 6977.34 6137.52 S 7715.91 E 5969580.02 N 393550.90 E 2.413 9813.04
12630.93 91.790 150.150 6922.71 6978.69 6220.77 S 7763.59 E 5969496.05 N 393597.30 E 5.408 9905.20
12726.32 91 .430 150.480 6920.03 6976.01 6303.61 S 7810.81 E 5969412.50 N 393643.26 E 0.512 9996.73
12821.92 91.180 149.710 6917.86 6973.84 6386.46 S 7858.46 E 5969328.94 N 393689.64 E 0.847 10088.58
12917.03 91.140 150.840 6915.93 6971.91 6469.03 S 7905.61 E 5969245.65 N 393735.53 E 1.189 10179.88
13012.20 92.850 150.150 6912.62 6968.60 6551.81 S 7952.45 E 5969162.18 N 393781.11 E 1.937 10271.10
7 December, 2004 - 14:05
Page 50f7
DrillQuest 3.03.06.006
Halliburton Sperry-Sun
Survey Report for CD1-11
Your Ref: API 501032050000
Job No. AKZZ349027, Surveyed: 5 November, 2004
Alaska North Slope North Slope, Alaska
Measured True Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft)
13107.44 92.180 150.270 6908.44 6964.42 6634.385 7999.72 E 5969078.89 N 393827.12 E 0.715 10362.49
13202.91 90.440 149.230 6906.25 6962.23 6716.83 5 8047.80 E 5968995.72 N 393873.94 E 2.123 10454.36
13298.05 89.710 149.150 6906.13 6962.11 6798.54 5 8096.53 E 5968913.28 N 393921.42 E 0.772 10546.20
13393.22 88.780 149.180 6907.38 6963.36 6880.25 S 8145.31 E 5968830.84 N 393968.94 E 0.978 10638.07
13488.72 89.520 149.850 6908.80 6964.78 6962.545 8193.75E 5968747.82 N 394016.13 E 1.045 10730.10
13584.51 89.200 149.870 6909.87 6965.85 7045.37 5 8241.84 E 5968664.27 N 394062.96 E 0.335 10822.26 .
13679.45 88.090 150.160 6912.12 6968.10 7127.58 S 8289.28 E 5968581.35 N 394109.13 E 1.208 10913.51
13774.94 89.260 151.700 6914.32 6970.30 7211.01 5 8335.66 E 5968497.21 N 394154.24 E 2.025 11004.85
13870.22 92.480 152.170 6912.88 6968.86 7295.07 5 8380.48 E 5968412.49 N 394197.77 E 3.415 11095.51
13965.67 91.120 152.360 6909.88 6965.86 7379.51 5 8424.87 E 5968327.38 N 394240.88 E 1 .439 11186.12
14061.39 92.230 153.040 6907.08 6963.06 7464.535 8468.76 E 5968241.70 N 394283.46 E 1.360 11276.78
14156.66 91.930 153.120 6903.62 6959.60 7549.42 5 8511.86E 5968156.17 N 394325.27 E 0.326 11366.78
14252.16 91.190 153.230 6901.02 6957.00 7634.61 S 8554.94 E 5968070.33 N 394367.05 E 0.783 11456.97
14347.56 90.310 153.340 6899.78 6955.76 7719.82 5 8597.82 E 5967984.48 N 394408.63 E 0.930 11547.04
14442.84 90.390 153.090 6899.19 6955.17 7804.87 5 8640.76 E 5967898.78 N 394450.27 E 0.275 11637.03
14538.32 87.860 151.960 6900.65 6956.63 7889.57 5 8684.80 E 5967813.43 N 394493.02 E 2.902 11727.57
14633.84 87.550 151.930 6904.48 6960.46 7973.79 S 8729.69 E 5967728.53 N 394536.62 E 0.326 11 818.40
14729.28 87.610 151.660 6908.51 6964.49 8057.835 8774.76 E 5967643.82 N 394580.40 E 0.290 11909.21
14824.72 87.850 151.160 6912.29 6968.27 8141.565 8820.39 E 5967559.40 N 394624.76 E 0.581 12000.23
14919.46 86.120 149.750 6917.27 6973.25 8223.87 S 8867.04 E 5967476.39 N 394670.15 E 2.354 12090.98
15012.54 85.310 149.960 6924.22 6980.20 8304.13 S 8913.66 E 5967395.43 N 394715.54 E 0.899 12180.29
15057.00 85.310 149.960 6927.86 6983.84 8342.49 5 8935.84 E 5967356.74 N 394737.13 E 0.000 12222.91 Projected 5urvey
All data is in Feet (U5 Survey) unless otherwise stated. Directions and coordinates are relative to True North. .
Vertical depths are relative to 55.98' above MSL. Northings and Eastings are relative to Well.
Global Northings and Eastings are relative to NAD27 Alaska State Planes, Zone 4.
The Dogleg Severity is in Degrees per 100 feet (US Survey).
Vertical Section is from Well and calculated along an Azimuth of 134.048° (True).
Based upon Minimum Curvature type calculations, at a Measured Depth of 15057,OOft.,
The Bottom Hole Displacement is 12224.82ft., in the Direction of 133.033° (True).
7 December, 2004 - 14:05
Page 6 of 7
DrillQuest 3.03.06.006
Halliburton Sperry-Sun
Survey Report for CD1-11
Your Ref: API 501032050000
Job No. AKZZ349027, Surveyed: 5 November, 2004
Alaska North Slope
North Slope, Alaska
Comments
Measured
Depth
(ft)
Station Coordinates
TVD Northings Eastings
(ft) (ft) (ft)
Comment
15057.00
6983.84
8342.49 S
8935.84 E Projected Survey
.
Survey tool program for CD1-11
From
Measured Vertical
Depth Depth
(ft) (ft)
To
Measured Vertical
Depth Depth Survey Tool Description
(ft) (ft)
0.00
706.00
0.00
697.01
706.00
15057.00
697.01 CB-SS-Gyro
6983.84 MWD+IIFR+MS+SAG
.
7 December, 2004· 14:05
Page 7 of 7
DrillQuest 3.03.06.006
.
.
08-Dec-04
AOGCC
Robin Deason
333 W. 7th Ave. Suite 100
Anchorage, AK 99501
Re: Distribution of Survey Data for Well CD1-11 MWD
Dear Dear Sir/Madam:
Enclosed are two survey hard copies and one disk with the *.PTT and *.PDF
files.
Tie-on Survey:
Window / Kickoff Survey:
Projected Survey:
0.00' MD
0.00' MD
15,057.00' MD
(if applicable)
PLEASE ACKNOWLEDGE RECEIPT BY SENDING AN EMAIL TO
CARL.ULRICH@HALLlBURTON.COM OR SIGNING AND
RETURNING A COPY OF THE TRANSMITTAL LETTER TO THE
ATTENTION OF:
Sperry-Sun Drilling Services
Attn: Carl Ulrich
6900 Arctic Blvd.
Anchorage, AK 99518
Date ) 11~)·-.t\-ü-1
Signed
¡/~-.J1 0 JLJ
Please call me at 273-3545 if you have any questions or concerns.
Regards,
William T. Allen
Survey Manager
Attachment(s)
Å(J v(__ f(~ 0
Halliburton Sperry-Sun
Alaska North Slope
North Slope, Alaska
CD1-11 (mwd)
.
Job No. AKMW349027, Surveyed: 5 November, 2004
Survey Report
7 December, 2004
Your Ref: API 501032050000
Surface Coordinates: 5975834.23 N, 385929.27 E (70' 20' 34.2161" N, 150' 55' 32.9021" W)
Grid Coordinate System: NAD27 Alaska State Planes, Zone 4
.
Kelly Bushing Elevation: 55.98ft above Mean Sea Level
spar"'r"'v-su:í!
bAILL ING· SSA.VICes
A Halliburton Company
Survey Ref: svy460
Halliburton Sperry-Sun
Survey Report for CD1-11 (mwd)
Your Ref: API 501032050000
Job No. AKMW349027, Surveyed: 5 November, 2004
Alaska North Slope North Slope, Alaska
Measured True Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) ("/1 DOft)
0.00 0.000 0.000 -55.98 0.00 0.00 N 0.00 E 5975834.23 N 385929.27 E 0.00 CB-8S-Gyro
84.00 0.250 55.000 28.02 84.00 0.11 N 0.15 E 5975834.33 N 385929.42 E 0.298 0.03
169.00 1.050 135.000 113.01 168.99 0.348 0.85 E 5975833.88 N 385930.12 E 1.219 0.85
258.00 5.000 124.000 201.87 257.85 3.09 S 4.65 E 5975831.07 N 385933.87 E 4.466 5.48
348.00 8.300 136.000 291.26 347.24 9.95 S 12.41 E 5975824.09 N 385941.53 E 3.959 15.84
437.00 10.700 139.000 379.03 435.01 20.81 8 22.30 E 5975813.08 N 385951.25 E 2.753 30.50 .
527.00 12.100 139.000 467.26 523.24 34.24 S 33.97 E 5975799.48 N 385962.71 E 1.556 48.22
617.00 13.800 135.000 554.96 610.94 48.95 S 47.75 E 5975784.56 N 385976.27 E 2.134 68.35
706.00 15.700 132.000 641.03 697.01 64.51 8 64.20 E 5975768.75 N 385992.48 E 2.300 91.00 MWD Magnetic
745.15 16.980 132.220 678.60 734.58 71.90 8 72.37 E 5975761.24 N 386000.54 E 3.273 102.01
833.22 20.220 130.820 762.06 818.04 90.49 8 93.42 E 5975742.32 N 386021.30 E 3.713 130.06
924.01 24.200 124.150 846.11 902.09 111.21 S 120.71 E 5975721.20 N 386048.27 E 5.183 164.08
1019.31 29.640 126.090 931.05 987.03 136.078 155.94 E 5975695.80 N 386083.13 E 5.782 206.69
1114.13 35.270 129.310 1011.03 1067.01 167.268 196.11 E 5975664.01 N 386122.81 E 6.209 257.24
1209.43 39.340 126.470 1086.83 1142.81 202.66 8 241.71 E 5975627.92 N 386167.87 E 4.636 314.63
1304.89 42.690 126.690 1158.85 1214.83 239.99 8 292.01 E 5975589.82 N 386217.59 E 3.513 376.74
1400.01 45.330 127.110 1227.25 1283.23 279.678 344.85 E 5975549.34 N 386269.82 E 2.792 442.31
1493.94 49.960 127.360 1290.52 1346.50 321.67 8 400.09 E 5975506.51 N 386324.42 E 4.933 511.21
1589.69 52.930 127.250 1350.19 1406.17 367.04 S 459.65 E 5975460.24 N 386383.28 E 3.103 585.56
1684.69 55.380 127.730 1405.82 1461.80 413.91 S 520.74 E 5975412.45 N 386443.65 E 2.611 662.06
1778.27 54.860 127.400 1459.33 1515.31 460.71 S 581.59 E 5975364.72 N 386503.78 E 0.626 738.34
1875.08 53.730 127.410 1515.83 1571.81 508.46 S 644.04 E 5975316.03 N 386565.50 E 1.167 816.42
1970.40 54.800 126.200 1571.50 1627.48 554.81 8 705.99 E 5975268.74 N 386626.74 E 1.524 893.17 .
2065.42 56.660 126.980 1625.00 1680.98 601.62 S 769.03 E 5975220.98 N 386689.06 E 2.072 971.03
2160.92 59.790 124.610 1675.29 1731.27 649.07 S 834.88 E 5975172.53 N 386754.18 E 3.897 1051.35
2256.14 59.870 123.510 1723.15 1779.13 695.178 903.08 E 5975125.39 N 386821.67 E 1.002 1132.42
2351.60 60.210 122.750 1770.82 1826.80 740.37 S 972.34 E 5975079.15 N 386890.23 E 0.776 1213.63
2446.49 57.990 125.180 1819.55 1875.53 785.84 S 1039.87 E 5975032.66 N 386957.06 E 3.209 1293.77
2541 .43 57.410 125.650 1870.28 1926.26 832.34 S 1105.27 E 5974985.17 N 387021.75 E 0.740 1373.11
2637.37 56.680 124.070 1922.47 1978.45 878.36 8 1171.32E 5974938.15 N 387087.09 E 1.577 1452.58
2732.69 56.300 123.310 1975.10 2031.08 922.44 8 1237.45 E 5974893.07 N 387152.54 E 0.775 1530.76
2827.77 57.030 125.240 2027.35 2083.33 967.18 S 1303.08 E 5974847.34 N 387217.48 E 1.862 1609.03
2922.59 56.510 125.450 2079.31 2135.29 1013.068 1367.78 E 5974800.47 N 387281.47 E 0.579 1687.44
3016.93 56.510 127.900 2131.37 2187.35 1060.05 8 1430.87 E 5974752.53 N 387343.85 E 2.166 1765.45
3112.16 57.820 128.140 2183.01 2238.99 1109.33 S 1493.91 E 5974702.29 N 387406.12 E 1.392 1845.02
7 December, 2004 - 14:10
Page 2 of7
Dril/Quest 3.03.06.006
Halliburton Sperry-Sun
Survey Report for CD1-11 (mwd)
Your Ref: API 501032050000
Job No. AKMW349027, Surveyed: 5 November, 2004
Alaska North Slope North Slope, Alaska
Measured True Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft)
3208.05 58.840 127.800 2233.35 2289.33 1159.54 8 1558.24 E 5974651.11 N 387469.69 E 1.106 1926.17
3292.10 58.920 127.940 2276.79 2332.77 1203.71 8 1615.04 E 5974606.08 N 387525.81 E 0.171 1997.71
3362.04 58.930 126.990 2312.89 2368.87 1240.158 1662.59 E 5974568.93 N 387572.80 E 1.163 2057.22
3457.74 58.370 127.270 2362.68 2418.66 1289.48 8 1727.75E 5974518.61 N 387637.20 E 0.636 2138.35
3553.30 57.430 128.570 2413.46 2469.44 1339.23 8 1791.61 E 5974467.90 N 387700.29 E 1.515 2218.83
3648.57 56.610 128.050 2465.32 2521.30 1388.778 1854.32 E 5974417.41 N 387762.24 E 0.975 2298.35 .
3744.00 55.710 128.330 2518.47 2574.45 1437.77 S 1916.61 E 5974367.46 N 387823.79 E 0.974 2377.20
3839.30 54.780 128.400 2572.79 2628.77 1486.37 S 1978.01 E 5974317.93 N 387884.43 E 0.978 2455.11
3934.81 53.690 127.700 2628.62 2684.60 1534.14 S 2039.03 E 5974269.24 N 387944.72 E 1.287 2532.18
4030.57 52.850 128.850 2685.88 2741.86 1581.678 2099.28 E 5974220.80 N 388004.24 E 1.302 2608.54
4125.92 51.870 128.600 2744.11 2800.09 1628.91 8 2158.19 E 5974172.67 N 388062.42 E 1.049 2683.72
4221.43 51.100 129.500 2803.59 2859.57 1675.98 8 2216.22 E 5974124.72 N 388119.73 E 1.092 2758.16
4316.43 50.640 129.300 2863.54 2919.52 1722.76 S 2273.17 E 5974077.08 N 388175.96 E 0.511 2831.61
4412.25 49.190 129.170 2925.24 2981.22 1769.13 S 2329.95 E 5974029.85 N 388232.03 E 1.517 2904.66
4507.22 49.070 130.820 2987.39 3043.37 1815.288 2384.96 E 5973982.87 N 388286.34 E 1.320 2976.29
4602.62 49.170 131.180 3049.82 3105.80 1862.60 S 2439.40 E 5973934.72 N 388340.05 E 0.304 3048.32
4698.36 48.680 132.120 3112.73 3168.71 1910.57 S 2493.33 E 5973885.95 N 388393.24 E 0.900 3120.43
4793.57 50.300 132.210 3174.58 3230.56 1959.16 S 2546.98 E 5973836.54 N 388446.15 E 1.703 3192.77
4889.03 49.320 131.720 3236.18 3292.16 2007.92 S 2601.20 E 5973786.96 N 388499.62 E 1.099 3265.65
4984.81 50.290 132.250 3297.99 3353.97 2056.86 S 2655.58 E 5973737.20 N 388553.25 E 1.097 3338.76
5079.78 50.120 132.250 3358.78 3414.76 2105.92 S 2709.59 E 5973687.32 N 388606.51 E 0.179 3411 .69
5175.39 49.830 133.610 3420.27 3476.25 2155.798 2763.20 E 5973636.65 N 388659.35 E 1.131 3484.89
5270.38 50.540 133.060 3481.09 3537.07 2205.86 S 2816.27 E 5973585.78 N 388711.65 E 0.870 3557.85 .
5366.03 52.300 131.380 3540.74 3596.72 2256.09 8 2871.65 E 5973534.71 N 388766.26 E 2.296 3632.58
5461.27 52.850 131 .140 3598.62 3654.60 2305.97 S 2928.51 E 5973483.97 N 388822.35 E 0.611 3708.12
5556.56 53.080 131.240 3656.01 3711.99 2356.068 2985.75 E 5973433.01 N 388878.82 E 0.255 3784.09
5651.97 54.370 130.960 3712.46 3768.44 2406.62 S 3043.71 E 5973381.57 N 388936.01 E 1.373 3860.91
5747.42 56.120 131.290 3766.87 3822.85 2458.20 8 3102.78 E 5973329.10 N 388994.29 E 1.855 3939.22
5840.98 59.720 128.580 3816.56 3872.54 2509.04 8 3163.57E 5973277.34 N 389054.30 E 4.563 4018.27
5938.93 59.260 125.390 3866.30 3922.28 2559.81 8 3230.96 E 5973225.56 N 389120.91 E 2.845 4102.00
6033.63 60.350 127.490 3913.93 3969.91 2608.43 8 3296.80 E 5973175.94 N 389186.00 E 2.236 4183.12
6129.09 60.800 123.690 3960.84 4016.82 2656.80 8 3364.40 E 5973126.55 N 389252.85 E 3.499 4265.34
6224.55 60.380 123.160 4007.72 4063.70 2702.60 8 3433.80 E 5973079.69 N 389321.55 E 0.654 4347.07
6319.80 59.880 122.860 4055.16 4111.14 2747.60 S 3503.06 E 5973033.64 N 389390.12 E 0.592 4428.14
6412.46 60.360 122.800 4101.32 4157.30 2791.16S 3570.57 E 5972989.06 N 389456.96 E 0.521 4506.94
7 December, 2004 - 14:10
Page 3 of7
DríllQuest 3.03.06.006
Halliburton Sperry-Sun
Survey Report for CD1-11 (mwd)
Your Ref: API 501032050000
Job No. AKMW349027, Surveyed: 5 November, 2004
Alaska North Slope North Slope, Alaska
Measured True Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft)
6510.87 62.900 126.120 4148.08 4204.06 2840.17 S 3641.93 E 5972938.98 N 389527.56 E 3.933 4592.30
6606.45 62.900 124.560 4191.63 4247.61 2889.38 8 3711.34 E 5972888.71 N 389596.21 E 1.453 4676.41
6702.16 62.760 123.140 4235.33 4291.31 2936.81 8 3782.05 E 5972840.21 N 389666.20 E 1.328 4760.21
6797.60 62.120 122.190 4279.49 4335.47 2982.48 S 3853.28 E 5972793.4 7 N 389736.72 E 1.108 4843.15
6893.22 61.850 122.250 4324.40 4380.38 3027.488 3924.69 E 5972747.38 N 389807.44 E 0.288 4925.77
6987.84 62.660 120.610 4368.46 4424.44 3071.14 S 3996.14 E 5972702.63 N 389878.22 E 1.757 5007.49 .
7083.99 62.980 121.780 4412.38 4468.36 3115.458 4069.31 E 5972657.22 N 389950.70 E 1.132 5090.87
7179.25 63.120 121.340 4455.55 4511.53 3159.898 4141.66E 5972611.69 N 390022.37 E 0.437 5173.78
7275.04 62.690 121.190 4499.18 4555.16 3204.15 S 4214.56 E 5972566.32 N 390094.58 E 0.470 5256.94
7369.39 61 .430 120.710 4543.39 4599.37 3247.028 4286.04 E 5972522.37 N 390165.40 E 1 .409 5338.12
7465.01 60.950 120.460 4589.47 4645.45 3289.658 4358.16 E 5972478.65 N 390236.87 E 0.552 5419.60
7560.25 60.510 120.670 4636.03 4692.01 3331.89 S 4429.70 E 5972435.32 N 390307.76 E 0.500 5500.39
7655.82 60.700 121.710 4682.94 4738.92 3375.02 8 4500.93 E 5972391.12 N 390378.32 E 0.969 5581.57
7751.29 60.440 123.010 4729.85 4785.83 3419.52 S 4571.17 E 5972345.55 N 390447.87 E 1.217 5662.99
7847.00 61.110 123.090 4776.58 4832.56 3465.07 8 4641 .18 E 5972298.94 N 390517.18 E 0.704 5744.98
7942.11 60.960 123.110 4822.64 4878.62 3510.51 S 4710.89 E 5972252.44 N 390586.19 E 0.159 5826.68
8037.52 61.260 123.290 4868.74 4924.72 3556.26 8 4780.79 E 5972205.64 N 390655.39 E 0.355 5908.72
8132.68 60.800 123.750 4914.83 4970.81 3602.23 S 4850.19 E 5972158.62 N 390724.09 E 0.642 5990.57
8228.46 60.580 123.680 4961.71 5017.69 3648.59 8 4919.66 E 5972111.21 N 390792.85 E 0.238 6072.74
8324.04 60.160 121.740 5008.97 5064.95 3693.48 8 4989.56 E 5972065.25 N 390862.06 E 1.818 6154.19
8419.03 60.010 124.550 5056.35 5112.33 3738.49 S 5058.49 E 5972019.20 N 390930.29 E 2.569 6235.03
8514.58 60.310 131.140 5103.94 5159.92 3789.31 S 5123.88 E 5971967.40 N 390994.90 E 5.990 6317.36
8610.02 61.050 123.720 5150.72 5206.70 3839.81 S 5189.91 E 5971915.89 N 391060.15 E 6.822 6399.93 .
8705.09 60.590 124.270 5197.07 5253.05 3886.22 8 5258.72 E 5971868.44 N 391128.25 E 0.699 6481.66
8800.29 61.210 122.640 5243.37 5299.35 3932.07 8 5328.12 E 5971821.54 N 391196.95 E 1.632 6563.42
8895.34 60.930 123.120 5289.35 5345.33 3977.24 8 5397.99 E 5971775.32 N 391266.11 E 0.531 6645.03
8990.71 61.050 123.780 5335.60 5391.58 4023.21 S 5467.58 E 5971728.29 N 391334.99 E 0.618 6727.01
9085.93 60.520 125.570 5382.08 5438.06 4070.48 S 5535.92 E 5971679.98 N 391402.61 E 1.733 6809.00
9181.12 60.500 126.250 5428.94 5484.92 4119.088 5603.03 E 5971630.37 N 391468.97 E 0.622 6891.02
9274.33 60.580 125.590 5474.79 5530.77 4166.698 5668.75 E 5971581.76 N 391533.97 E 0.622 6971.36
9372.02 60.580 125.980 5522.77 5578.75 4216.458 5737.78 E 5971530.96 N 391602.23 E 0.348 7055.57
9467.48 59.810 125.610 5570.22 5626.20 4264.90 S 5804.97 E 5971481.50 N 391668.67 E 0.874 7137.55
9562.65 59.010 126.630 5618.65 5674.63 4313.198 5871.14 E 5971432.21 N 391734.10 E 1.248 7218.69
9658.08 57.940 126.580 5668.55 5724.53 4361.69 8 5936.45 E 5971382.71 N 391798.66 E 1.122 7299.34
9753.35 56.490 128.060 5720.14 5776.12 4410.24 S 6000.14 E 5971333.20 N 391861.61 E 2.005 7378.88
7 December, 2004 - 14:10
Page 4 of7
Dril/Quest 3.03.06.006
Halliburton Sperry-Sun
Survey Report for CD1-11 (mwd)
Your Ref: API 501032050000
Job No. AKMW349027, Surveyed: 5 November, 2004
Alaska North Slope North Slope, Alaska
Measured True Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft)
9847.79 55.780 128.770 5772. 76 5828.74 4458.96 S 6061.59 E 5971283.55 N 391922.30 E 0.977 7456.92
9943.85 55.280 128.790 5827.13 5883.11 4508.57 S 6123.32 E 5971233.01 N 391983.28 E 0.521 7535.78
10038.88 56.300 130.330 5880.56 5936.54 4558.62 S 6183.90 E 5971182.04 N 392043.09 E 1.717 7614.12
10133.95 56.460 128.290 5933.20 5989.18 4608.77 S 6245.15 E 5971130.97 N 392103.57 E 1.795 7693.01
10229.51 56.460 127.130 5986.00 6041.98 4657.48 S 6308.16 E 5971081.30 N 392165.83 E 1.012 7772.17
10325.16 56.330 127.000 6038.94 6094.92 4705.50 S 6371.73 E 5971032.32 N 392228.66 E 0.177 7851.24 .
10420.47 56.540 126.190 6091.64 6147.62 4752.84 S 6435.49 E 5970984.01 N 392291.70 E 0.742 7929.99
10515.85 56.270 124.360 6144.42 6200.40 4798.72 S 6500.35 E 5970937.15 N 392355.85 E 1.623 8008.50
10611.00 56.630 125.670 6197.00 6252.98 4844.23 S 6565.29 E 5970890.67 N 392420.09 E 1.208 8086.81
10706.96 56.690 124.640 6249.74 6305.72 4890.38 S 6630.83 E 5970843.52 N 392484.92 E 0.899 8166.01
10800.97 56.380 124.550 6301.58 6357.56 4934.91 S 6695.39 E 5970798.01 N 392548.79 E 0.339 8243.37
10897.90 56.200 125.320 6355.38 6411.36 4981.08 S 6761.49 E 5970750.84 N 392614.19 E 0.686 8322.99
10993.29 56.390 124.040 6408.31 6464.29 5026.23 S 6826.75 E 5970704.70 N 392678.75 E 1.134 8401.28
11088.57 56.230 126.070 6461.17 6517.15 5071.76S 6891.64 E 5970658.19 N 392742.94 E 1.781 8479.58
11183.94 56.210 129.180 6514.21 6570.19 5120.15 S 6954.41 E 5970608.86 N 392804.97 E 2.710 8558.33
11279.38 57.560 130.340 6566.35 6622.33 5171.28 S 7015.86 E 5970556.80 N 392865.63 E 1.743 8638.04
11375.01 58.870 134.420 6616.73 6672.71 5226.06 S 7075.87 E 5970501.10 N 392924.80 E 3.876 8719.27
11470.19 61.840 134.800 6663.81 6719.79 5284.15 S 7134.75 E 5970442.12 N 392982.79 E 3.140 8801.98
11565.84 64.280 135.450 6707.14 6763.12 5344.58 S 7194.90 E 5970380.79 N 393042.01 E 2.622 8887.23
11661.31 67.090 135.930 6746.44 6802.42 5406.83 S 7255.67 E 5970317.62 N 393101.83E 2.979 8974.18
11756.91 69.170 135.510 6782.05 6838.03 5470.34 S 7317.61 E 5970253.17 N 393162.79 E 2.214 9062.86
11852.57 72.380 136.080 6813.55 6869.53 5535.09 S 7380.57 E 5970187.48 N 393224.76 E 3.402 9153.13
11947.71 76.230 137.840 6839.28 6895.26 5602.02 S 7443.06 E 5970119.60 N 393286.23 E 4.421 9244.58 .
12043.36 79.700 140.170 6859.23 6915.21 5672.62 S 7504.40 E 5970048.08 N 393346.49 E 4.340 9337.76
12137.25 81.770 144.260 6874.35 6930.33 5745.84 S 7561.16 E 5969974.00 N 393402.12 E 4.831 9429.46
12201.04 82.700 145.880 6882.97 6938.95 5797.66 S 7597.34 E 5969921.64 N 393437.52 E 2.908 9491.49
12275.40 85.610 148.850 6890.54 6946.52 5859.94 S 7637.22 E 5969858.76 N 393476.44 E 5.577 9563.46
12344.06 87.160 149.770 6894.87 6950.85 5918.87 S 7672.20 E 5969799.31 N 393510.51 E 2.624 9629.57
12439.99 84.310 149.410 6902.00 6957.98 6001.36 S 7720.61 E 5969716.08 N 393557.67 E 2.994 9721.72
12534.95 86.600 150.280 6909.53 6965.51 6083.21 S 7768.16 E 5969633.53 N 393603.97 E 2.579 9812.80
12630.93 91.600 149.500 6911.03 6967.01 6166.20 S 7816.29 E 5969549.81 N 393650.83 E 5.272 9905.10
12726.32 91.230 150.570 6908.68 6964.66 6248.81 S 7863.92 E 5969466.48 N 393697.19 E 1.187 9996.77
12821.92 90.990 150.140 6906.83 6962.81 6331.88 S 7911.20 E 5969382.70 N 393743.20 E 0.515 10088.51
12917.03 90.930 152.080 6905.23 6961.21 6415.14 S 7957.14 E 5969298.76 N 393787.87 E 2.040 10179.42
13012.20 92.650 151.050 6902.26 6958.24 6498.78 S 8002.43 E 5969214.43 N 393831.89 E 2.106 10270.12
7 December, 2004 - 14:10
Page 50f7
DrillQuest 3.03.06.006
Halliburton Sperry-Sun
Survey Report for CD1-11 (mwd)
Your Ref: API 501032050000
Job No. AKMW349027, Surveyed: 5 November, 2004
Alaska North Slope North Slope, Alaska
Measured True Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (°/1 DOft)
13107.44 91.980 150.320 6898.41 6954.39 6581.76S 8049.02 E 5969130.76 N 393877.21 E 1.040 10361.30
13202.91 90.250 149.880 6896.56 6952.54 6664.50 8 8096.60 E 5969047.30 N 393923.52 E 1.870 10453.03
13298.05 89.510 149.410 6896.75 6952.73 6746.60 S 8144.68E 5968964.48 N 393970.35 E 0.921 10544.67
13393.22 88.580 149.830 6898.34 6954.32 6828.69 S 8192.80 E 5968881.67 N 394017.22 E 1.072 10636.33
13488.72 89.320 149.320 6900.09 6956.07 6911.02 8 8241.16 E 5968798.61 N 394064.31 E 0.941 10728.33
13584.51 89.010 149.440 6901.49 6957.47 6993.45 8 8289.94 E 5968715.45 N 394111.84 E 0.347 10820.70 .
13679.45 87.900 150.090 6904.05 6960.03 7075.44 8 8337.73 E 5968632.74 N 394158.37 E 1.355 10912.06
13774.94 89.260 151.580 6906.41 6962.39 7158.798 8384.25 E 5968548.69 N 394203.62 E 2.112 11003.45
13870.22 92.280 152.510 6905.13 6961.11 7242.94 S 8428.90 E 5968463.87 N 394246.99 E 3.316 11094.05
13965.67 90.930 152.250 6902.46 6958.44 7327.488 8473.14E 5968378.67 N 394289.93 E 1 .440 11184.62
14061.39 92.040 152.730 6899.98 6955.96 7412.34 S 8517.33E 5968293.14 N 394332.83 E 1.263 11275.39
14156.66 91.730 153.400 6896.84 6952.82 7497.238 8560.47 E 5968207.61 N 394374.66 E 0.775 11365.41
14252.16 90.990 152.930 6894.58 6950.56 7582.42 8 8603.56 E 5968121.77 N 394416.46 E 0.918 11455.62
14347.56 90.120 153.430 6893.65 6949.63 7667.55 S 8646.60 E 5968035.99 N 394458.20 E 1.052 11545.74
14442.84 90.190 153.150 6893.40 6949.38 7752.67 8 8689.43 E 5967950.24 N 394499.73 E 0.303 11635.70
14538.32 87.650 151.690 6895.20 6951.18 7837.278 8733.62 E 5967864.97 N 394542.63 E 3.068 11726.29
14633.84 87.350 151.960 6899.36 6955.34 7921.39 S 8778.68 E 5967780.17 N 394586.40 E 0.422 11817.16
14729.28 87.410 151.590 6903.73 6959.71 8005.40 8 8823.77 E 5967695.49 N 394630.21 E 0.392 11907.98
14824.72 87.650 151.120 6907.84 6963.82 8089.08 S 8869.48 E 5967611.13 N 394674.64 E 0.553 11999.01
14919.46 85.920 150.020 6913.15 6969.13 8171.468 8915.96 E 5967528.05 N 394719.85 E 2.163 12089.69
15012.54 85.120 149.740 6920.42 6976.40 8251.728 8962.52 E 5967447.08 N 394765.19 E 0.910 12178.97
15057.00 85.120 149.740 6924.20 6980.18 8289.99 S 8984.84 E 5967408.49 N 394786.93 E 0.000 12221.62 Projected Survey
All data is in Feet (U8 8urvey) unless otherwise stated. Directions and coordinates are relative to True North. .
Vertical depths are relative to 55.98' above M8L. Northings and Eastings are relative to Well.
Global Northings and Eastings are relative to NAD27 Alaska State Planes, Zone 4.
The Dogleg 8everity is in Degrees per 100 feet (US 8urvey).
Vertical Section is from Well and calculated along an Azimuth of 134.050° (True).
Based upon Minimum Curvature type calculations, at a Measured Depth of 15057.00ft.,
The Bottom Hole Displacement is 12225.03ft., in the Direction of 132.69r (True).
7 December, 2004 - 14:10
Page 60f7
DrillQuest 3.03.06.006
Halliburton Sperry-Sun
Survey Report for CD1-11 (mwd)
Your Ref: API 501032050000
Job No. AKMW349027, Surveyed: 5 November, 2004
Alaska North Slope
North Slope, Alaska
Comments
Measured
Depth
(ft)
Station Coordinates
TVD Northings Eastings
(ft) (ft) (ft)
Comment
15057.00
6980.18
8289.99 S
8984.84 E Projected Survey
.
Survey tool program for CD1-11 (mwd)
Fro m
Measured Vertical
Depth Depth
(ft) (ft)
To
Measured Vertical
Depth Depth Survey Tool Description
(ft) (ft)
0.00
706.00
0.00 706.00
697.01 15057.00
697.01 CB-SS-Gyro
6980.18 MWD Magnetic
.
7 December, 2004 - 14:10
Page 70f7
DrillQuest 3.03.06.006
Re: CD 1-11 Request to Commence Injection
e
e
Subject: Re: CDl-ll Request to Commence Injection
From: Thomas Maunder <tom_maunder@admin.state.ak.us>
Date: Tue, 25 Jan 2005 14:26:33 -0900
To: "Hanson, Kelli L" <Kelli.L.Hanson@conocophillips.com>
CC: jimJegg@admin.state.ak.us, "Pierson, Chris R" <Chris.R.Pierson@conocophillips.com>,
"Alonzo, Chris" <Chris.Alonzo@conocophillips.com>, "Schneider, Tim S."
<Tim.S.Schneider@conocophillips.com>
Kelli, et al:
The new MIT has been provided for CD 1-11 and it is acceptable. Based on the operations
description, bond log and new MIT, I concur with your assessment regarding the isolation of the
Alpine interval. You have approval to place the well in service.
Once the well is thermally stable, please make arrangements for an Inspector to witness a MIT.
Please call or message with any questions.
Tom Maunder, PE
AOGCC
Hanson, Kelli L wrote:
Mr. Maunder,
CPAI requests approval to commence injection into CD1-11.
The CD1-11 SCMT log is attached. The log indicates good quality cement is
present across the logged interval from 12/098 MD (6/881' TVD SS) up to the
tubing tail at 11/576' MD (6/724' TVD SS).
The packer is located at 11/505' MD (6/692' TVD SS) @ 62.7 deg.
The top of the Alpine C sand is located at 12/150' MD (6/889' TVD SS) @ 82
deg.
The 7" casing shoe is located at 12/293' MD (6/904' TVD SS) @ 86 deg.
PBTD is located at 15/057' MD (6/928' TVD SS) @ 85 deg.
Placement of the cement job went as planned with good returns:
Description of the 7" casing cement job pumped on 11/2/04:
PJSM. Dowell pumped 5 Bbls. CW 100. Tested lines to 3700 PSI. Pumped 55 Bbls CW 100 @ 4.5
BPM 500 PSI and dropped bottom plug. Pumped 50 Bbls. Mud push XL 12.5 PPG @ 4.5 BPM 450
PSI. Followed by 53 Bbls. Lite Crete mixed at 11 PPG. and 24 Bbls. of Dowell INTER mixed at
15.8 PPG. Pumped at 4.5 BPM 500 PSI. Dropped top plug and Dowell pumped 20 Bbls. water.
Switched to Rig Pump and displaced with 447 Bbls. 9.7 PPO mud at 4.5 BPM bumped plug and
CIP @ 1830 Hrs. 11/2/04. Floats held and had good returns.
The tubing and casing were successfully MIT'd on 11/7/04 as documented
below:
Rigged up lubricator and dropped rodlball. Tested lines to 4500 PSI. Pressured tubing to 4200 PSI
and set packer. Tested tubing to 4200 PSI for 30 Min. Bled tubing to 700 PSI and tested annulus to
lof2
1/25/20052:26 PM
Re: CD 1-11 Request to Commence Injection
e
e
3500 PSI for 30 Min. Bled Annulus to 0 and left 700 PSI on tubing.
Based on this information I've concluded the Alpine interval is adequately
isolated in CD1-ll. ·
We would like to place this well on injection as soon as possible.
Your early attention to this request would be appreciated.
Thanks,
Kelli
«CD1-11_1320 Alpine disposal. pdt» «CD1-11_ SCMT.zip» «rev CD1-11 Tbg detail.xls»
«MIT CD1-11 11-7-04.xls» «CD1-11_State.ppt»
Kelli L. Hanson
Production Engineer
Alpine Engineering
WNS Subsurface Development
907.265.6945
20f2
1/25/2005 2:26 PM
.
.
MECHANI CAL INTEGRITY REPORT'
'..
dOl.\. -\.«;0
?-IG RELE;..S~: .
OPER & FIELD C.V~!: ~\~\~ c..\2.~
w"'ELL NUMBER <-t) \ - \ \
::?UD D.!..'!Z: :
.:..:.;:;e:r:
~~
TD: , 5OS1HD.. G,C\)f( TVD i :?BTD: HD TVD
'\ \\ Sc,. \-J ~ MD
Shoe: \ð~ ~ till lDq 0\.\ TVD i DV: ·TV"D
~~ Shoe: MD TVD¡ 7CP: t·m :"-tD
~!:;.LL DATA
Ca.sing:
_ ~D:!..~g:
Packer \ \5t>ç MD
TVD i See ê t \ \ S ~ -:;>
P e:r£5 ~<t 'f"'.... to ~\Cè
\ Ç) ð-~ ~ - \S'OS'l
:'-:ole Size
anå
~C?..Þ...NIC;-L INTEGRITY - PART 11
\\l....-o'-\ Annulus Press Test: ::;:1' 3SòÕ i 15 min ~45"O i 30 min ~,",öO.
Co¡¡¡¡¡¡en t s: 'T'h~.. ..... !.\-~CIt.... 'I't)\- 0(> ~,~ 'N1~c o¡,~ \0\ 1:\ -=~ .
...-
~ CRJÜ'll Cp...l. INTEGRITY - PART J 2 \t(.(...J 5~ \)\.>\ s
Cement: Volumes :". ,Amt. Liner Ñ ~ ; Csg ~\ ~""b~\"'DV \J~
Cwe -';01 to cover perfs 'Nt '3>O~o ~ ~ \ ~ 'o\,)\~ ~~\\~Ct.~
~v~'\c-~t,,~\o c,o\Xt, ~~ ~Ç> O~ ~\~\N. f(\~~ ÇOj'
Theoretical TOe WI ~O(O v..~ ~~Otf"~\C.Ck\.. \Oc.\~ '"X..c;')OO'
. ~<::'"",,"l,,,-o>
Cement Bond Log (Yes or NO)~i In AOGCC File ~~~
\.D<;, S>~'<> ...o\- .....c.o.<-\... +o~ o~ ~\N'. .
CBL E:valuation, :::.one above perfs 1:", ~~ '~~r-....\t....\ (t~CI.\vc.
~rt.~~ c:.ctc..~"c, ~/bc...:ë) '.> c;.O~o. <:>O~u..JI.r-..u.~ \ou.Jtl..~\o(J.'íoQ:.\\'''f" t..~()'lCllo\
-\--\-..0." o+~, ~~~ b" ~\r~....o- ~~'\\"':.-
Proàu~tion Log: Type
¡Evaluation
CONCLUSIONS: .,
? art il : QjI,.'r: -.-.n'¡) <,. ~ "1'O->~t: o~\.tr\o-\. ,"\ / ~...;)\1S\ ~:§:J
?ar~ :2: H!:'"",~ \~~ . . \J~-t)Ç
'¡lfl ~'/~)--ob
t W: CUI-II MIT (I/25/05)
e
e
Subject: FW: CDI-II MIT (1/25/05)
From: NSK Problem Well Supv <nI617@conocophillips.com>
Date: Tue, 25 Jan 2005 13:35:07 -0900
To: Thomas Maunder <tom_maunder@admin.state.ak.us>, "Hanson, Kelli L"
<Kelli.L.Hanson@conocophillips.com>
CC: bob_fleckenstein@admin.state.ak.us, NSK Problem Well Supv <nI617@conocophillips.com>
Tom,
Here is the pre start up retest MITIA for CD1-11.
Please let us know if you have enough data to approve injection commencement.
After the well is brought on line and warmed up we will complete a State Witnessed MITIA
MJ Loveland
ConocoPhillips
Problem Well Supervisor
659-7224
-----Original Message-----
From: Alpine Lead Operators
Sent: Tuesday, January 25,2005 1:21 PM
To: NSK Problem Well Supv
Cc: Hanson, Kelli L; Pierson, Chris R; Schneider, Tim 5.; Alpine Lead Operators
Subject: CD1-11 MIT (1/25/05)
MJ...
Looked a lot better this time.
Ian
«MIT CRU CD1-11 1-25-05.xls»
Content-Description: MIT CRU CDI-II 1-25-05.xls
Content-Type: application/vnd.ms-excel
Content-Encoding: base64
CRU CD1-11
I of 1
1/25/20052:19 PM
e
e
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
Mechanical Integrity Test
Email to:Tom_Maunder@admin.state.ak.us;Bob_Fleckenstein@admin.state.ak.us;andJim_Regg@admin.state.ak.us
OPERATOR:
FIELD I UNIT I PAD:
DATE:
OPERATOR REP:
AOGCC REP:
ConocoPhillips Alaska Inc.
Alpine I CRUI CD1
January 25th, 2005
Shorty Davis
I
P
Well
P.T.D.
Notes:
Well
P.T.D.
Notes:
Well
P.T.D.
Notes:
Well
P.T.D.
Notes:
Test Details:
(..\t..,-t~~ \~ <
1ft ?YV\. \, ,».1)
TYPE INJ codes
F = Fresh Water Inj
G = Gas Inj
S = Salt Water Inj
N = Not Injecting
TYPE TEST Codes
M = Annulus Monitoring
P = Standard Pressure Test
R = Internal Radioactive Tracer Survey
A = Temperature Anomaly Survey
0= Differential Temperature Test
INTERVAL Codes
I = Initial Test
4 = Four Year Cycle
V = Required by Variance
Test during Workover
o = Other (describe in notes)
MIT Report Form
Revised: 05/19/02
MIT CRU CD1-11 1-25-05-1.xls
1/2512005
e
-
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
Mechanical Integrity Test
Email to:Jimr.¡¡~Qg(â?adrnin.sta[¡~.ak.us. Bob Fieckenst0in(â?adrnin.staie.ak.u:>
OPERATOR: ConocoPhillips Alaska, Inc.
FIELD I UNIT I PAD: Alpine/CD1
DATE: 11/7/2004
OPERATOR REP: Larry Hill
AOGCC REP:
Packer Depth Pretest Initial 15 Min. 30 Min. 45 Min. 60 Min.
Well1CD1-11 I Inj. Type N TVD 6,749' Tubing 700 1,100 1,080 1,080 Interval! I
P.T.D.204-180 / Test Type p Test psil 3500 IA 3,500 3,450 3,400 P/F/ P
Notes: OA
"'\~ .\-~~-\- ~C<è~ N)\- ~\\.J ç:~O\)\ h'2û~ðV\..
-
50 v>c:;.\ \~~,\" ~c-~obC;€~Q\\()~ ¡xr-\ocl r
~1H
\/~~-ðÇ
MIT Report Form
Revised: 03/18/04
MITCD1-1111-7-04.xls
Kb: ttwd: CDI-ll Request to Commence Injl>n]
e
Subject: RE: [Fwd: CD1-ll Request to Commence Injection]
From: NSK Problem Well Supv <n1617@conocophillips.com>
Date: Mon, 24 Jan 2005 07:38:46 -0900
To: Thomas Maunder <tom_maunder@admin.state.ak.us>
CC: "Hanson, Kelli L" <Kelli.L.Hanson@conocophillips.com>
Tom
Agreed.
MJ
-----Original Message-----
From: Thomas Maunder [mailto:tom_maunder@admin.state.ak.us]
Sent: Monday, January 24,20057:33 AM
To: NSK Problem Well Supv
Cc: Hanson, Kelli L
Subject: Re: [fwd: CD1-11 Request to Commence Injection]
MJ,
That will work for me. As usual, once the well is thermally stable then the witnessed MIT will need
to be conducted.
Tom
NSK Problem Well Supv wrote:
Tom,
I think it would be appropriate if we re MIT'd the well.
I can get it scheduled this week and will submit the results for your
review.
Kelli and I can provide a review of the testing criteria with those
involved in conducting the tests to ensure the criteria are understood.
MJ Loveland
ConocoPhillips
Problem Well Supervisor
659-7224
-----Original Message-----
From: Thomas Maunder [!!'.,,:,-1~_t..2_:t:.9_J!l_~~:r:!:.9_":Fi§Ì~9~i:.!:1:..:~!.9-t~:_i3.k. us]
Sent: Monday, January 24, 2005 7:12AM
To: NSK Problem Well Supv
Cc: Hanson, Kelli L
Subject: Re: [Fwd: CD1-11 Request to Commence Injection]
MJ and Kelli,
It may be appropriate to make sure that all who do such tests know that
there are two criteria for passing an MIT. Since this test was
conducted during the completion, Problem Wells likely was not involved.
The MIT criteria are:
1. Less than 10% pressure decline in 30 minutes and;
2. A stabilizing trend.
For this particular well, the test meets condition #1, but fails
condition #2. In this case it would have been possible to continue the
observation to 1 hour or to bleed off and begin a new test.
Please call or message with comments.
lof4
1/24/20052:35 PM
RE: [Fwd: CDl-ll Request to Commence Injln]
e
Tom Maunder, PE
AOGCC
NSK Problem Well Supv wrote:
Tom,
You are right. The MIT does not appear stable. This is the first that
I have seen of this documentation, the testing information was not
routed through our office.
I will follow up with give you a call and follow up with the Engineer
on
Monday.
MJ Loveland
ConocoPhillips
Problem Well Supervisor
659-7224
-----Original Message-----
From: Thoma s Ma unde r [~'9.:~l.~:(?.=.!:S2!!1_!l1a~J!l0:~_~([\\.?:dmi n . S tat e . ak . us]
Sent: Saturday, January 22, 2005 10:12 AM
To: NSK Problem Well Supv
Subject: [Fwd: CD1-11 Request to Commence Injection]
MJ, Brad, Jerry, or who ever:
You should have just received a message regarding the completion MIT
conducted on this well. For your information, the MIT is contained in
the attachments. Stabilization is not indicated.
Jerry, give me a call on this.
Tom
-------- Original Message --------
Subject: CD1-11 Request to Commence Injection
Date: Wed, 12 Jan 2005 17:38:01 -0900
From: Hanson, Kelli L cKelli.L.Hanson@conocophillips.com>
To: torn rnaunder@admin.state.ak.us,
bob f 1 eckens teTn@a¿ffiin~··sEate:iik·:l~ls;---
Jiffi-regg@adffiIri.:·staEe:ãk:liš--··---_·_-
CC: Pierson, Chris R cChris.R.Pierson@conocophillips.co¡n>, Alonzo,
Chr is c Chr is. Al onzo@conocõpETITTp·s·:coffi·;~··scEri.eTder;·-TTffi-s:--·
5.::r::~.!l1:_§:~~.b:0..~i0:.~E~\;C?I.1:9.C::S2Phj:..:1_~.~E~..:_s:g1!!?
Mr. Maunder,
CPA I requests approval to commence injection into CD1-11.
The CD1-11 SCMT log is attached. The log indicates good quality cement
is present across the logged interval from 12,098 MD (6,881' TVD SS) up
20f4
1/24/20052:35 PM
Kb: Ltwd: ("Vl-ll Request to Commence Inj.n]
e
to the tubing tail at 11,576' MD (6,724' TVD SS).
The packer is located at 11,505' MD (6,692' TVD SS) @ 62.7 deg.
The top of the Alpine C sand is located at 12,150' MD (6,889' TVD SS) @
82 deg.
The 7" casing shoe is located at 12,293' MD (6,904' TVD SS) @ 86 deg.
PBTD is located at 15,057' MD (6,928' TVD SS) @ 85 deg.
Placement of the cement job went as planned with good returns:
Description of the 7" casing cement job pumped on 11/2/04:
PJSM. Dowell pumped 5 Bbls. CW 100. Tested lines to 3700 PSI. Pumped 55
Bbls CW 100 @ 4.5 BPM 500 PSI and dropped bottom plug. Pumped 50 Bbls.
Mud push XL 12.5 PPG @ 4.5 BPM 450 PSI. Followed by 53 Bbls. Lite Crete
mixed at 11 PPG. and 24 Bbls. of Dowell INTER mixed at 15.8 PPG. Pumped
at 4.5 BPM 500 PSI. Dropped top plug and Dowell pumped 20 Bbls. water.
Switched to Rig Pump and displaced with 447 Bbls. 9.7 PPG mud at 4.5
BPM
bumped plug and CIP @ 1830 Hrs. 11/2/04. Floats held and had good
returns.
The tubing and casing were successfully MIT'd on 11/7/04 as documented
below:
Rigged up lubricator and dropped rod/ball. Tested lines to 4500 PSI.
Pressured tubing to 4200 PSI and set packer. Tested tubing to 4200 PSI
for 30 Min. Bled tubing to 700 PSI and tested annulus to 3500 PSI for
30
Min. Bled Annulus to 0 and left 700 PSI on tubing.
Based on this information I've concluded the Alpine interval is
30f4
1/24/20052:35 PM
1ili: U"wd: CDI-II Request to Commence Injln]
e
adequately isolated in CD1-11.
We would like to place this well on injection as soon as possible.
Your early attention to this request would be appreciated.
Thanks,
Kelli
«CD1-11 1320 Alpine disposal.pdf» «CD1-11_SCMT.zip» «rev CD1-11
Tbg
detail.xls» «MIT CD1-11 11-7-04.xls» «CD1-11_State.ppt»
Kelli L. Hanson
Production Engineer
Alpine Engineering
WNS Subsurface Development
907.265.6945
40f4
1/24/20052:35 PM
Ke: cv 1-11 (204-180)Request to Commence ¡tion
e
Subject: Re: CD 1-11 (204-180)Request to Commence Injection
From: Thomas Maunder <tom _ maunder@admin.state.ak.us>
Date: Sat, 22 Jan 2005 10:09:28 -0900
To: "Hanson, Kelli L" <Kelli.L.Hanson@conocophillips.com>
CC: jimJegg@admin.state.ak.us, "Pierson, Chris R" <Chris.R.Pierson@conocophillips.com>,
"Alonzo, Chris" <Chris.Alonzo@conocophillips.com>, "Schneider, Tim S."
<Tim.S.Schneider@conocophillips.com>, NSK Problem Well Supv <NI617@conocophillips.com>
All,
I am examining the infonnation submitted with regard to this well. Please look at the MIT conducted
on 11/7/04 that was provided. It does not appear that the reported pressures exhibit stabilization. 50
psi is lost in each observation period. It would appear that prior to initiating injection into this well
that a new MIT be conducted.
Please call or message with any questions.
Tom Maunder, PE
AOGCC
Hanson, Kelli L wrote:
Mr. Maunder,
CPAI requests approval to commence injection into CDl-ll.
The CDl-ll SCMT log is attached. The log indicates good quality cement is
present across the logged interval from 12,098 MD (6,881' TVD SS) up to the
tubing tail at 11,576' MD (6,724' TVD SS).
The packer is located at 11,505' MD (6,692' TVD SS) @ 62.7 deg.
The top of the Alpine C sand is located at 12,150' MD (6,889' TVD SS) @ 82
deg.
The 7" casing shoe is located at 12,293' MD (6,904' TVD SS) @ 86 deg.
PBTD is located at 15,057' MD (6,928' TVD SS) @ 85 deg.
Placement of the cement job went as planned with good returns:
Description of the 7" casing cement job pumped on 11/2/04:
PJSM. Dowell pumped 5 Bbls. CW 100. Tested lines to 3700 PSI. Pumped 55 Bbls CW 100 @ 4.5
BPM 500 PSI and dropped bottom plug. Pumped 50 Bbls. Mud push XL 12.5 PPG @ 4.5 BPM 450
PSI. Followed by 53 Bbls. Lite Crete mixed at 11 PPG. and 24 Bbls. of Dowell INTER mixed at
15.8 PPG. Pumped at 4.5 BPM 500 PSI. Dropped top plug and Dowell pumped 20 Bbls. water.
Switched to Rig Pump and displaced with 447 Bbls. 9.7 PPG mud at 4.5 BPM bumped plug and
CIP @ 1830 Hrs. 11/2/04. Floats held and had good returns.
The tubing and casing were successfully MIT'd on 11/7/04 as documented
below:
Rigged up lubricator and dropped rodlball. Tested lines to 4500 PSI. Pressured tubing to 4200 PSI
lof2
1/22/2005 10:19 AM
Ke: CD 1-11 (204-I80)Request to Commence action
e
and set packer. Tested tubing to 4200 PSI for 30 Min. Bled tubing to 700 PSI and tested annulus to
3500 PSI for 30 Min. Bled Annulus to 0 and left 700 PSI on tubing.
Based on this information I've concluded the Alpine interval is adequately
isolated in CDl-ll.
We would like to place this well on injection as soon as possible.
Your early attention to this request would be appreciated.
Thanks,
Kelli
«CD1-11_1320 Alpine disposal.pdf» «CD1-11_SCMT.zip» «rev CD1-11 Tbg detail.xls»
«MIT CD1-11 11-7-04.xls» «CD1-11_State.ppt»
KelJi L. Hanson
Production Engineer
Alpine Engineering
WNS Subsurface Development
907.265.6945
20f2
1/22/2005 10: 19 AM
LV 1-11 Request to Commence Injection
e
e
Kelli L. Hanson
Production Engineer
Alpine Engineering
WNS Subsurface Development
907.265.6945
Content-Description: CD1-11_1320 Alpine
CDI-Il_1320 Alpine Content-Type: application/octet-stream
Content-Encoding: base64
Content-Description: CDI-II_SCMT.zip
CDI-ll_SCMT .zip Content-Type: application/x -zip-compressed
Content-Encoding: base64
Content-Description: rev CD 1-11 Tbg detai1.xls
rev CDI-II Tbg Content-Type: application/vnd.ms-excel
Content-Encoding: base64
Content-Description: MIT CD1-11 11-7-04.xls
MIT CDI-1l1 Content-Type: application/vnd.ms-excel
Content-Encoding: base64
Content-Description: CD 1-11_ State.ppt
Content- Type: application/vnd.ms-powerpoint
Content-Encoding: base64
20f2
1/22/2005 9:36 AM
o
-1500
-3000
-4500
-6000
-7500
-9000
-10500
-12000
4500
10500
12000
13500
6000
7500
9000
W 68t(- )/East( + )
",,/
ConocoPhil
d
"0
1'''
:po
,...
"0
'n
o
;U
;;
:po
:::!
o DEPTH SS'TVD
I: FEET FEET
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
Mechanical Integrity Tes1
OPERATOR: ConocoPhillips Alaska inc
E-Mail to;Tom_Maunder@admin.state.ak.usandBob_Fleckenstein@admin.state.ak.us
PTD: 204-180
Well #: CD1-11
COMMENTS:
PTD: 204-180
Well #: CD1-11
COMMENTS:
PTD:
Well #:
COMMENTS:
PTD:
Well #:
COMMENTS:
PTD:
Well #:
COMMENTS:
FIELD I UNIT I PAD:
7", 26#, L -80
7", 26#, L -80
TBG. INJ. FLUID CODES
F = FRESH WATER INJ.
G = GAS INJ.
S = SALT WATER INJ.
N = NOT INJECTING
Distribution:
orig - Well File
c . Operator
c - Database
c· Trip Rpt File
c - Inspector
TEST TYPE:
M = ANNULUS MONITORING
P = STD ANNULUS PRESSURE TEST
R = INTERNAL RAD. TRACER SURVEY
A = TEMPERATURE ANOMALY TEST
D = DIFFERENTIAL TEMPERATURE TEST
OPERATOR REP SIGNATURE:
Larry Hill
Alpine I CD1
DATE:
11n/2004
ANNULAR FLUID: P.P.G.
DIESEL 6.8
GLYCOL
SALTWATER 9.3
DRILLING MUD
OTHER
Grad.
0.35
0.00
0.48
0.00
0.00
WELL TEST:
Initial X
4 - Year
W orkover
Other
, AOGCC REP SIGNATURE:
http://partners.conocophillipsalaska.com/drilling/dataloperationslalpine/cd1/cd1-11/casing & tubing detailslCD1-11 MIT.xls
(Rev 9/23/99)
.
Well Job# Log Description Date BL
.2œ-215 CD1-229 10942798 INJECTION TEST 11/23/04 1
J./)j-- {77 CD2-27 10922509 TEMPERATURE LOG 12/10/04 1
').oe(...t10 CD1-11 10922523 SCMT 01/07/05
2t:> 'I~2J{o CD1-20 10942823 SCMT 01/07/05
.
1119/05
Schlumberger
NO. 3310
Schlumberger-DCS
2525 Gambell Street, Suite 400
Anchorage, AK 99503-2838
Attn: Beth
Company: Alaska Oil & Gas Cons Comm
Attn: Helen Warman
333 West 7th Ave, Suite 100
Anchorage, AK 99501
Field:
Alpine
Color
Prints
CD
1
1
,
,II j f'
SIGCi ~Áf .l(/~ DATE: /lrf6'
Please sign and ,e,",J)e copy ofth is '..nsmlttal to Beth a' the above address 0' fax '0 (907) 561-8367. Than k you.
.
.
-:;;0 ý - ('t 0
WELL LOG TRANSMITTAL
To: State of Alaska
Alaska Oil and Gas Conservation Comm.
Attn.: Helen Warman
333 West ih Avenue, Suite 100
Anchorage, Alaska 99501-3539
December 1,2004
RE: MWD Formation Evaluation Logs: CD I-II,
AK-MW-3349027
The technical data listed below is being submitted herewith. Please acknowledge receipt by
returning a signed copy of this transmittal letter to the attention of:
Rob Kalish, Sperry-Sun, 6900 Arctic Blvd., Anchorage, AK 99518
I LDWG formatted Disc with verification listing.
API#: 50-103-20500-00.
* ) ?- qq
01
Re: BOP Doyon 19 11-03-04 CD 1-II.xIs
.
Subject: Re: BOP Doyon 19 11-03-04 CDl-ll.xls
From: Thomas Maunder <tom_maunder@admin.state.ak.us>
Date: Thu, 04 Nov 200409:14:24 -0900
To: "Johnson, Vern" <Vern.Johnson@conocophillips.com>
.
.,,/
Thanks Verno Good management decision. I thought that was what it might be.
Tom
Johnson, Vern wrote:
Tom,
The first test was performed after setting 9-5/8" surface casing and installing
the BOP. The second test was performed after running and cementing 7" casing.
We mayor may not have been able to drill production hole and run the completion
within 14 days of the initial test, so the logical time to test BOP is after 7"
casing is ran. Odds are that we could have made it within the 14 day window, but
we decided not to risk it. That proved to be the right decision on the last
well.
Vern
-----Original Message-----
From: Thomas Maunder [mailto:tom maunder@admin.stat~.ak.us]
Sent: Thursday, November 04, 2004 8:08 AM
To: Johnson, Vern
Subject: Re: BOP Doyon 19 11-03-04 CD1-11.xls
Vern,
I was cleaning emails out on CD1-11 and I
submitted for October 26 and November 3.
close in time. Anything unusual??
Tom
noted that there were BOP test reports
Interesting that 2 tests were done so
I of I
11/4/20049:18 AM
STATE OF ALASKA
OIL AND GAS CONSERVATION COMMISSION
BOPE Test Report
Submit to: ¡jm reQQ~admin.state.ak.us
aOQcc prudhoe bav@adm;r1.state.ak.us
bob f;ecker1ste;r1~admin . state .ak.us
Contractor: Doyon Rig No.: 19 DATE: 11/3/2004
Rig Rep.: D. Lutrick Rig Phone: 670-4300 Rig Fax: 670-4301
Operator: Conoco Phillips Alaska IrOp. Phone: 670-4302 Op. Fax: 670-4303
Rep.: R. Lupton
Field/Unit & Well No.: Colville R. CD1-11
Location: Section: 5
Operation: Drlg: x
Test: Initial:
Test Pressure: Rams: 250/5000
MISC. INSPECTIONS:
Test Result
Location Gen.: P
Housekeeping: P
PTD On Location P
Standing Order Posted P
BOP STACK:
Quantity
1
1
1
1
1
2
1
o
1/28/04
Annular Preventer
Pipe Rams
Lower Pipe Rams
Blind Rams
Choke Ln. Valves
HCR Valves
Kill Line Valves
Check Valve
Well Sign
Dr!. Rig
Hazard Sec.
Size
13-5/8
3-1/2 x 6
3-1/2 x 6
blinds
3-1/8
3-1/8
3-1/8
MUD SYSTEM: Visual Test
Trip Tank P
Pit Level Indicators P
Flow Indicator P
Meth Gas Detector P
H2S Gas Detector P
Alarm Test
P
P
P
P
P
PTD #204-189
Township: T11N
Workover:
Weekly: x
si Annular: 250/3500
TEST DATA
Meridian:
Range:
Explor. :
Other:
Valves: 250/5000 si
Umiat
R5E
Test Result
P
P
P
FLOOR SAFETY VALVES:
Quantity Test Result
Upper Kelly 1 P
Lower Kelly 1 P
Ball Type 1 P
Inside BOP 1 P
Test Result
P
P
P
P
P
P
P
NA
CHOKE MANIFOLD:
Quantity Test Result
No. Valves 16 P
Manual Chokes 1 P
Hydraulic Chokes 1 P
ACCUMULATOR SYSTEM:
Time/Pressure Test Result
System Pressure 3000 P
Pressure After Closure 1500 P
200 psi Attained 32 P
Full Pressure Attained 2 min 57 sec. P
Blind Switch Covers: All stations P
Nitgn. Bottles (avg): 4 @ 1750 psi
Test Results
Number of Failures: º Test Time: 4.5 Hours Components tested 28
Repair or replacement of equipment will be made within n/a days. Notify the North Slope
Inspector 659-3607, follow with written confirmation to Superviser at: Bm reQQ~admin.state.ak.us
Remarks: Good Test
24 HOUR NOTICE GIVEN
YES x NO
Waived By John Crisp
Date 11/01/04 Time 8:30pm
Witness Robert Lupton
Test start 9:00pm11/2 Finish 1 :30am11/3
BOP Test (for rigs)
BFL 1/28/04
BOP Doyon 1911-03-04 CD1-11.xls
Re: CD 1-11 outer annular pressure
.
Subject: Re: CD1-11 outer annular pressure
From: Thomas Maunder <tom _ maunder@admin.state.ak.us>
Date: Wed, 03 Nov 2004 15:43:21 -0900
To: "Johnson, Vem" <Vem.Johnson@conocophillips.com>
.
d,O 4- \.&-0
Vern,
Thanks for the information. I am glad that on further investigation, the original
issue was not confirmed. With no high pressure issue now evident, your normal plan
forward is appropriate. Keeping an eye on the OA pressure of CD1-11 for some
period of time is appropriate as well.
Please inform us if anything unusual is seen.
Tom Maunder, PE
AOGCC
Johnson, Vern wrote:
Tom,
As discussed, here are the details regarding the outer annular pressure on
CD1-11.
While drilling the 8-1/2" intermediate hole section with Doyon 19 on CD1-11, gas
break out from the mud system was observed at surface. Gas cut mud was also
observed at surface. The well was checked for flow several times and there was
never an indication of an influx. After total depth for the section was reached,
a heavier mud cap was placed above the suspected zone to facilitate running the
7" casing string.
It is estimated that the gas bearing zone is in the K2/K3 interval between 6040'
MD/3983, TVD and 6230' MD/4072' TVD. LWD logs indicate several sand intervals
which could be gas bearing. Offset porosity and density logs show that these
sands are thin bedded with varying reservoir properties due to secondary
cementation. For further details regarding the geologic interpretation, please
contact Steve Moothart 265-6965.
After running and cementing 7" casing, a pressure gauge was connected to the
9-5/8" x 7" annulus. The initial pressure reported by a member of the rig crew
was 1750 psi. Alpine operations, and ConocoPhillips Problem Wells Group were
notified. The AOGCC was also then notified. Upon further investigation the
gauge was originally misread, and the pressure on the annulus is actually 200
psi, which is not abnormally high. We plan to perform an annular LOT and pump
diesel for freeze protection as originally planned. We will also continue to
monitor annular pressure on the well.
We apologize for the confusion. Please let me know if you need further
information.
Vern Johnson
CPAI Alpine Drilling
907-265-6081 (w)
907-748-3906 (c)
907-265-1515 (fx)
«Johnson, Vern.vcf»
1 ofl
11/4/2004 8:01 AM
STATE OF ALASKA
OIL AND GAS CONSERVATION COMMISSION
BOPE Test Report
Submit to: ¡¡m re~m@admín.state.ak.us
aogcc prudhoe bav@adm¡n.state.8k.us
bob Í;eckenste;n@admín.state.ak.us
Contractor: Doyon Rig No.: 19 DATE: 10/26/2004
Rig Rep.: D. Burley Rig Phone: 670-4300 Rig Fax: 670-4301
Operator: Conoco Phillips Alaska IrOp. Phone: 670-4302 Op. Fax: 670-4303
Rep.: R. Lupton
Field/Unit & Well No.: Colville R. CD1-11
Location: Section: 5
Operation: Drlg: x
Test: Initial: x
Test Pressure: Rams: 250/5000
MISC. INSPECTIONS:
Test Result
Location Gen.: P
Housekeeping: P
PTD On Location P
Standing Order Posted P
BOP STACK:
Quantity
1
1
1
1
1
2
1
o
1/28/04
Annular Preventer
Pipe Rams
Lower Pipe Rams
Blind Rams
Choke Ln. Valves
HCR Valves
Kill Line Valves
Check Valve
Well Sign
Dr!. Rig
Hazard Sec.
Size
13-5/8
3-1/2 x 6
3-1/2 x 6
blinds
3-1/8
3-1/8
3-1/8
MUD SYSTEM: Visual Test
Trip Tank P
Pit Level Indicators P
Flow Indicator P
Meth Gas Detector P
H2S Gas Detector P
Alarm Test
P
P
P
P
P
PTD # 28...180
Township: T11 N
Workover:
Weekly:
si Annular: 250/3500
TEST DATA
Meridian:
Range:
Explor. :
Other:
Valves: 250/5000 si
Umiat
R5E
Test Result
P
P
P
FLOOR SAFETY VALVES:
Quantity Test Result
Upper Kelly 1 P
Lower Kelly 1 P
Ball Type 1 P
Inside BOP 1 P
Test Result
P
P
P
P
P
P
P
NA
CHOKE MANIFOLD:
Quantity Test Result
No. Valves 16 P
Manual Chokes 1 P
Hydraulic Chokes 1 P
ACCUMULATOR SYSTEM:
Time/Pressure Test Result
System Pressure 2975 P
Pressure After Closure 1400 P
200 psi Attained 28 P
Full Pressure Attained 2 min 55 see, P
Blind Switch Covers: All stations P
Nitgn. Bottles (avg): 4 @ 1750 psi
Test Results
Number of Failures: º Test Time: 4.5 Hours Components tested 28
Repair or replacement of equipment will be made within n/a days. Notify the North Slope
Inspector 659-3607, follow with written confirmation to Superviser at: Hm reQQ@admín.state.ak.us
Remarks: Good Test
24 HOUR NOTICE GIVEN
YES x NO
Date
1 0/25/04
Waived By
Chuck Scheve
Time
12:00PM
Test start 5:00am10/26 Finish 9:30am10/26
Witness
Robert Lupton
BOP Test (for rigs)
BFL 1/28/04
BOP Doyon 19 10-26-04 CD1-11.xls
.
ffi)~
.
11)
~
FRANK H. MURKOWSKI, GOVERNOR
AT~ASIiA. OILAlWD GAS
CONSERVATION COMMISSION
333 W. 7fH AVENUE, SUITE 100
ANCHORAGE, ALASKA 99501-3539
PHONE (907) 279-1433
FAX (907) 276-7542
C. Alvord
Alpine Drilling Team Leader
ConocoPhillips Alaska, Inc.
P.O. Box 100360
Anchorage, Alaska 99510-0360
Re: Colville River CD 1-11
ConocoPhillips Alaska, Inc.
Permit No: 204-180
Surface Location: 293' FNL, 2503' FEL, SEC. 5, T11N, R5E, UM
Bottomhole Location: 1275' FSL, 1203' FWL, SEe. 10, T11N, R5E, UM
Dear Mr. Alvord:
Enclosed is the approved application for permit to drill the above referenced service well.
This permit to drill does not exempt you from obtaining additional permits or approvals required
by law from other governmental agencies, and does not authorize conducting drilling operations
until all other required permits and approvals have been issued. In addition, the Commission
reserves the right to withdraw the permit in the event it was erroneously issued.
Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the
Alaska Administrative Code unless the Commission specifically authorizes a variance. Failure
to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska
Administrative Code, or a Commission order, or the terms and conditions of this permit may
result in the revocation or suspension of the permit. Please provide at least twenty-four (24)
hours notice for a representative of the Commission to witness any required test. Contact the
Commission's petroleum field inspector at (907) 659-36 ager).
BY ORDER 9F THE COMMISSION
DATED this~ day of October, 2004
cc: Department ofFish & Game, Habitat Section wlo encl.
Department of Environmental Conservation wlo encl.
1a. Twe of Work: Drillllj
Re-entr~ D
2. Operator Name:
ConocoPhillips Alaska. Inc.
3. Address:
-- --'
~(;)'"'
STATE OF ALASKA
ALASKA OIL & GAS COMMISSION
PERMIT TO DRILL
Redrill U 1b. Current Well Class:
Stratigraphic Test D
P.O. SOX 100360 Anchorage, AK 99510-0360
4a. Location of Well (Govemmental Section):
Surface: 293' FNL,~FEL, Sec. 5, T11N, R5E, UM ~
Top of Productive HOriZOn;r;¿?/ 7 8 PL.J
786' FNL, 554' FEL, Sec. 9, T11 N, R5E, UM
Total Depth:
1275' FSL, 1203' FWL. Sec. 10. T11 N, R5E, UM /
4b. Location of Well (State Base Plane Coordinates):
Surface: x- 385929.303 ./ y-
16. Deviated wells:
Kickoff depth: 200
18. Casing Program
Size
Hole Casing
42" 16"
12.25" 9.625"
8.5" 7"
N/A 4.5"
19
Total Depth MD (tt):
Casing
Structural
Conductor
Detailed Operations
Intennediate
Production
Uner
Perforation Depth MD (ft):
,,/
5975834.2 Zone-
ft. fv1aximum Hole Angle: 90°
Spa( 'fications
Weight Grade Coupling Length
62.5# H-40 Weld 77'
36# J-55 BTC 3306'
26# L-80 STc-M 12248'
12.6# L-80 1ST-mod 11592'
PRESENT WELL CONDITION SUMMARY
Total Depth TVD (tt): Plugs (measured)
Length
Size
20. Attachments: Filing Fee 0
Property Plat D
BOP SketchD
Diverter Sketch D
Drilling programEJ
Seabed Report D
21. Verbal Approval: Commission Representative:
22. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Commission Use Only
API Number: Permit Approval
50-/63- 2Dç()()-ó::) Date: /0/ ¿,/~t./
Samples required D Yes ~NO Mud log required ( D Yes ~ No
Hydrogen sulfide measures D Yes ~NO Directional survey required ~Yes Ò No
. \J\ \ \~. \t"'\-~'->~\\~ \~ O\,t..\\>\~"-~ 't"o..c..c...a~ "'-11 ~ \(J \ ~ ~ .
Oth2l:3r. ~5i 0 't \~~ ~""- ~O ~ ~<>\-f \SO\'-tê~\-\~~~CJ. \ L \ '-\.~'l<>,
v« Ie; o.:''-J~ dO~'-d-S\O'3S-~~';)) "~t.~~\)\"'ú.~~ à-\Jt\t\tð-S-"\sct(),')
/ BY ORDÈR OF . /~
Appr edbyf U '1 COMMISSIONER THE COMMISSION Date: /tJ/ .lÚ¥:__
KI::Ut:I'Vt=U
Printed Name
Signature
C. Alvord
~.A-{()tJ¿
.I
Permit to Drill
Number: 2b c{ - I g ()
Conditions of approval :
Vv- '-"
ExploratoryU Development Oil U Multiple Zone 0
SeNice 0 Development Gas D Single Zone 0
5. Bond: ~ Blanket U Single Well 11. Well Name and Number:
Bond No. 59-52-180 CD1-11
6. Proposed Depth: 12. FieldlPool(s):
MD: 15785' , TVD: 6968' / Colville River Field
7. Property Designation:
ADL 025559. 372095
8. Land Use Permit:
Alpine River Pool
13. Approximate Spud Date:
10/23/2004
ASRCNPRA
9. Acres in Property.
2560
14. Distance to
Nearest Property. 293' FNL, Sec. 5
10. KB Elevation
15. Distance to Nearest
4
Well within Pool: CD1-12. 1596'
(Height above GL): 52 feet
17. Anticipated Pressure (see 20 AAC25.035)
Max. Downhole Pressure: 3153 psig '" / Max. Surface Pressure: 2456 pSig
Setting Depth Quantity of Cement
Bottom c. 1. or sacks
TVD (including stage data)
114'
2368' 616 sx AS Lite & 230 sx LiteCrete
6962' 188 sx Class G
6792'
Top
MD
37'
37'
37'
32'
TVD
37'
37'
37'
32'
MD
114'
3343'
12285'
11624'
(To be completed for Redrill and Re-Entry Operations)
Effective Depth MD (ft): Effective Depth TVD (tt): Junk (measured)
Cement Volume MD
TVD
Perforation Depth TVD (ft):
Time v. Depth Plot lJ
Drilling Fluid Program 0
Date:
Shallow Hazard Analysis D
20 AAC 25.050 requirements 0
Contact Vem Johnson @ 265-6081
Title Alpine Drilling Team Leader
Phone 2J;, é _ ~ / Î-D Date 1 ( (If- ((:) +-
.) . PrRnared hv Zam~ KuenzlF!r~_
See cover letter
for other requirements
SEP 1 5 2004
Form 10-401 Revised 3/2003, Submit in Duplicate
ORIGINAL
Alaska Oil & Gas Cons. Commission
Anchorage
CD1-11 Drilling Hazards Summary
(to be posted in Rig Floor Doghouse Prior to Spud)
(See Well Plan Attachment: Detailed Risk Information for further discussion of these risks)
12 1/4" H I /9 5/8" C I t
- oe - aSlna n erva
Event Risk Level Mitigation Strategy
Conductor Broach Low Monitor cellar continuously durinq interval.
Well Collision Low Gyro single shots as required
Gas Hydrates Low Monitor well at base of permafrost, increased mud
,¡ weight, decreased mud viscosity, increased
~ circulating times, controlled drilling rates, low mud
temperatures
Running Sands and Gravel Low Maintain planned mud parameters, Increase mud
weight, use weighted sweeps.
Abnormal Pressure in Low Increase mud weight
Surface Formations
>2000' TVD
Lost Circulation Low Reduce pump rates, mud rheology, lost circulation
material, use of low density cement slurries
8-1/2" Hole /7" Casin
Event
Abnormal Pressure in
Surface Formations
>2000' TVD
Lost circulation
Interval
Risk Level
Low
Low
Hole swabbing on tl'ips
Moderate
Abnormal Reservoir
Pressure
Low
Hydrogen Sulfide gas
Low ./
v
Miti ation Strate
BOPE drills, Keep mud weight above 9.6 ppg. v'
Check for flow during connections and if needed,
increase mud wei ht.
Reduced pump rates, reduced trip speeds, real time
equivalent circulating density (ECO) monitoring, mud
rheolo ,lost circulation material
Reduced trip speeds, mud properties, proper hole
filling, pumping out of hole, real time equivalent
circulating density (ECO) monitoring, weighted
swee s.
Well control drills, increased mud weight. No
mapped faults occur within 7001 of the planned
wellbore.
H2S drills, detection systems, alarms, standard well
control ractices, mud scaven ers /
6-1/8" Hole / Horizontal Production Hole
Event Risk Level
Lost circulation Low
Hole swabbing on trips
Moderate
Abnormal Reservoi:'
Pressure
Medium
Hydrogen Sulfide gas
Low
/
M iti ation Strate
Reduced pump rates, reduced trip speeds, real time
equivalent circulating density (ECO) monitoring, mud
rheolo ,lost circulation material
Reduced trip speeds, Pump out to 7" shoe, mud
properties, proper hole filling, pumping out of hole,
real time equivalent circulating density (ECD)
monitorin ,wei hted swee s.
BOPE drills, Keep mud weight above 8.8 ppg.
Check for flow during connections and if needed,
increase mud weight. Well control drills, increased
mud wei ht.
H2S drills, detection systems, alarms, standard well
control ractices, mud scaven ers
Q. fã t6~IAt
. 1\~. . . u, ~"
--.-
~
Alpine: CD1-11 Procedure
Procedure
1. Move on Doyon 19.
2. Rig up on riser
3. Drill 12-1j.¡" hole to the surface casing point as per the directional plan.
4. Run and cement 9-5/8" surface casing.
5. Pressure test casing to 2500 psi.
6. Install and 'cest BOPE to 5000 psi.
7. Pick up and run in hole with 8-1/2" drilling BHA.
8. Drill out 20' of new hole. Perform leak off test.
.I
9. Drill 8-%" hole to intermediate casing point in the Alpine Sands. (LWD Program: GR/RES/PWD)
10. Run and cement 7" casing as per program. Top of cement> 957' MD above Alpine C sand. Carry out a
leak off test down the 9-5/8" x 7" casing annulus to confirm the fracture pressure referenced to the casing
shoe. Freeze protect casing annulus and casing. Note: Additional cement may be required if any
sands are deemed commercially viable. ---- ---.J
11. Pressure test casing to 3500 psi.
12. BOPE test to 5000 psi.
13. Run drilling assembly. Drill out and perform formation integrity test to 12.5 ppg EMW. Minimum acceptable
leak off for drilling ahead is 11.5 ppg EMW.
0/
14. Drill 6-1/8" horizontal section to well TD (LWD Program: GR/RES/PWD).
15. Circulate the hole clean and pull out of hole, displacing the well to 9.2 ppg brine.
16. Run 4-Y2, 12.6#, L-80 tubing with DB nipple, gas lift mandrel(s), and packer. Land hanger.
17. Install 2 way check and pressure test hanger seals to 5000 psi. Nipple down BOP.
18. Install tubi~g head adapter assembly. Pressure test adapter assembly to 5000 psi. Remove 2 way check.
19. Circulate tubing to diesel and install freeze protection in the annulus.
20. Drop ball and set packer. Test tubing and tubing-casing annulus separately to 3500 psi 1 30 mins.
21. Set BPV and secure well. Move rig off.
ORIGINAL
Well Proximity Risks:
Directional drilling / collision avoidance information as required by 20 ACC 25.050 (b) is provided in
following attachments. CD1-10 will be the closest well to CD1-11. Well separation is 10.1' @ 300' MD.
Accounting for survey uncertainties, the ellipse-to-ellipse separation is 5.2' @ 300' MD.
Orillina Area Risks:
There are no high-risk events (e.g. over-pressures zones) anticipated. ,/
Lost circulation: Faulting within the Alpine reservoir section is considered to be the most likely cause of lost
circulation. Standard LCM material has proved effective in dealing with lost circulation in previous
development wells.
Additional care and attention will be given to the higher potential of inducing a kick when drilling horizontally
as opposed to vertically. Good drilling practices will be stressed to minimize the potential of taking swabbed
kicks.
Annular Pumpina Operations:
Incidental fluids developed from drilling operations on well C01-11 will be injected into a permitted annulus
on C02 pad or the class 2 disposal well on CD1 pad.
The CD1-11 surface/intermediate casing annulus will be flushed with 300 bbls of fresh water prior to freeze
protecting with diesel to 2000' TVD. The only significant hydrocarbon zone is the Alpine reservoir and there
will be 500'· of cement fill above the top of the Alpine as per regulations.
Upon completion of CD1-11 form 10-403, Application for Sundry Operations,will be filed. Annular pumping
of fluids occurring due to drilling operations, per regulation 20 AAC 25.080, could then begin once properly
permitted. As stated above, any zones containing significant hydrocarbons will be isolated prior to initiating
annular pumping. There will be no USDW's open below the shoe or potable/industrial water wells within
one mile of the receiving zone. Reference the enclosed directional drilling plan for other formation markers
in this well.
Surface càsing will be set near the base of the Schrader Bluff Formation (C-40). These 450-500' thick
shales are part of the Colville Group and are known to provide vertical barriers to fluid flow in other areas.
The maximum volume of fluids to be pumped down the annulus of this well will not exceed 35,000 bbl
without the specific permission of the AOGCC. Fluid densities will range from diesel to a maximum of 12.0
ppg for drilling fluid wastes. Using 12.0 ppg fluid and the rig's specified maximum pumping pressure of
1,500 psi for annular injection, the maximum pressure at the surface casing shoe is estimated by:
Max Shoe Pressure = (12.0 ppg) * (0.052) * (Surf. Shoe TV D) + 1,500 psi
= (12.0 ppg) * (0.052) * (2390') + 1,500 psi
= 2,990 psi
Pore Pressure = 1,081 psi
Therefore Differential = 2991 - 1081 = 1910 psi.
The internal casing pressure is conservative, since frictional losses while pumping have not been taken into
consideration. The surface and intermediate casing strings exposed to the annular pumping operations
have sufficient strength by using the 85% collapse and burst ratings listed in the following table:
Wt Connection 85% of 85% of
00 (ppf) Grade Range Type Collapse Collapse Burst Burst
9-5/8" 36 J-55 3 BTC 2,020 psi 1,717psi 3,520 psi 2.992 psi
7" 26 L-80 3 BTC-Mod 5,41 0 ps i 4.599 psi 7,240 psi 6,154 psi
l1\.¡ Ril'ß;tN A L
.WI f I.i "" 5 "-"r.-' ;' ; ,
.........
.--/
CD1-11
DRilliNG FLUID PROGRAM
SPUD to Intermediate hole to 7" Production Hole
9-5/8"surface casing casing point - 8 Y2" Section - 6 1 18"
point - 12 14"
Density 8.8 - 9.6 ppg 9.6 - 9.8 ppg 9.0-9.6 ppg ../
PV 1 0 - 25 10-15
YP 20 - 60 15 - 25 25 -30
Funnel Viscosity 1 00 - 200
Initial Gels 4-8 1 0-15
10 minute gels <18 12-20
API Filtrate NC - 10 cc I 30 min 4 -12 cc/30 min (drilling) NA
HPHT Fluid Loss at 160 12-14 cc/30 min
PH 8.5-9.0 9.0 - 10.0 9.0-9.5
KCL 6%
Oil Iwater ratio
Surface Hole:
A standard high viscosity fresh water I gel spud mud is recommended for the surface interval. Keep
flowline viscosity at ± 200 sec/qt while drilling and running casing. Reduce viscosity prior to cementing.
Maintain mud weight < 9.6 ppg by use of solids control system and dilution where necessary.
Intermediate Hole Section:
Fresh water gel I polymer mud system. Ensure good hole cleaning by pumping regular sweeps and
maximizing fluid annular velocity. There is potential for lost circulation, particularly after the Alpine is
penetrated. Maintain mud weight at or below 9.8 ppg and be prepared to add loss circulation material. Good
filter cake quality, hole cleaning and maintenance of low drill solids (by diluting as required) will all be
important in maintaining wellbore stability.
Production Hole Section :
The horizontal production interval will be drilled with aM-I Flo-Pro drill-in fluid. The base fluid will consist of
6% KCI, with ± 30PPB calcium carbonate bridging material to minimize formation damage. Flo-Vis Polymer
and Dual-Flo starch will be used for viscosity and fluid loss control respectively.
ORIGINAL
Colville River Field
CD1-11 Injection Well Completion Plan
16" Conductor to 114'
Updated 9/13/04
Sperry Sun Directional
Plan WP 02
4-1/2" Camco OS Nipple (3.812')
at 1800' TVD = 2283' MD
9-5/8" 36 ppf J-55 STC
Surface Casing
@ 3343' MD / 2368' TVD
cemented to surface
Packer Fluid mix:
92 PPQ KCI Srine
with 2000' TVD diesel cap
4-1/2" 12.6 ppf L-80 1ST M
tubing run with Jet Lube Run'n'Seal
pipe dope
Tubìna susoended with diesel
Comoletion MD TVD
Tubing Hanger 32' 32'
4-1/2", 12.6#/ft, 1ST-Mod Tubing
Camco DS6 nipple 2283' 1800'
4-1/2", 12.6#/ft, 1ST-Mod Tubing
Camco KSG2- GLM (3.909" 10) 11452' 6710'
4-1/2", 12.6#/ft, 1ST -Mod Tubing (2)
Baker S3 Packer w/ millout extension 11532' 6750'
4-1/2", 12.6#/ft, 1ST-Mod Tubing (1)
HES "XN" (3.725")-64.0° inc 11612' 6787'
4-1/2", 12.6#/ft, 1ST-Mod 10' pup joint
WEG 11624' 6792'
'''<'~~t~~_ ~_
'-....;..;.c ·~,_~c
Top Alpine C at 12113' MD / 6941' TVD ...<~-- -
Cameo KBG-2 GLM (3.909" DRIFT 10)
wi dummy
Baker 83 Packer WI millout extension at +1- 11532' MOl
6750' TVD < 200' TVD from top of Alpine
TOC @ +1- 11156' MD I 6552' TVD
(>2058' MD above top Alpine)
Well TD at
15785' MD I
6968' TVD
--
7" 26 ppf L-80 STC Mod
Production Casing @ 12285' /6968' TVD @+/- 86.0º
œJIßI~r\L
-'
'-'
CD1-11
PRESSURE INFORMATION AND CASING DESIGN
(per 20 ACC 25.005 ( c ) (3,4) and as required in 20 ACC 25.035 (d) (2))
The following presents data used for calculation of anticipated surface pressure (ASP) during drilling of this well:
Casing Size Csg Setting Fracture Pore pressure ASP Drilling
(in) Depth Gradient (Ibs. I (psi) (psi)
MDfTVD(ft) gal)
16 114/114 10.9 52 53
9 5/8 3343 I 2368 14.5 1072 1549
7" 12285 I 6962 16.0 3150 2456
N/A 15785 I 6968 16.0 3153 N/A
. NOTE: The Doyon 19 5000 psi BOP equipment is adequate. Test BOP's to minimum 3500 psi.
PROCEDURE FOR CALCULATING ANTICPATED SURFACE PRESSURE (ASP)
ASP is determined as the lesser of 1) surface pressure at breakdown of the formation casing seat with a gas
gradient to the surface, or 2) formation pore pressure at the next casing point less a gas gradient to the surface as
follows:
1) ASP = [(FG x 0.052) - 0.1]0
Where: ASP = Anticipated Surface pressure in psi
FG = Fracture gradient at the casing seat in Ib/gal
0.052 = Conversion from Ib./gal to psi/ft
0.1 = Gas gradient in psi/ft
0=: true Vertical depth of casing seat in ft RKB
OR
2) ASP = FPP - (0.1 x D)
Where; FPP = Formation Pore Pressure at the next casing point
ASP CALCULATIONS
1. Drilling below conductor casing (16")
ASP = [(FG x 0.052) - 0.1] D
= [(10.9 x 0.052) - 0.1] x 114 = 53 psi
OR
ASP = FPP - (0.1 x D)
= 1072 - (0.1 x 2368) = 835 psi
2. Drilling below surface casing (9 5/8")
ASP = [(FG x 0.052) - 0.1] 0
= [(14.5 x 0.052) - 0.1] x 2368 = 1549 psi
OR
ASP = FPP - (0.1 x D)
= 3150 - (0.1 x 6962') = 2454 psi
3. Drilling below intermediate casing (7")
ASP = FPP - (0.1 x D)
= 3153 - (0.1 x 6968') = 2456 psi I
ORIGINAL
95/8" Surface Casine: run to 3343' MD I 2368' TVD.
Cement from 3343' MD to 2843' (500' of fill) with Class G + Adds @ 15.8 PPG, and from 2710' to surface with
Arctic Set Lite 3. Assume 300 % excess annular volume in permafrost and 50 % excess below the permafrost
(1795' MD).
Lead slurry:
(2843'-1795') X 0.3132 fe/ft X 1.5 (50% excess) = 401.2 fe below permafrost
1795' X 0.3132 fe/ft X 4 (300% excess) = 2248.8ft3 above permafrost
Total volume = 492.4 + 2248.8 = 2741.2 ft3 => 616 Sx @ 4.45 ft3/sk
System:
616 Sx ArcticSet Lite 3 @ 10.7 PPG yielding 4.45 ft3/sk, Class G + 30% D053 thixotropic additive,
0.6% D046 antifoamer, 1.5% D079 extender, 1.5% SOOI accelerator, 50% D124 extender and 9%
BWOW1 D044 freeze suppressant
Tail slurry:
500' X 0.3132 fe/ft X 1.5 (50% excess) = 234.9 fe annular volume
80' X 0.4341 fe/ft = 34.7 fe shoe joint volume
Total volume = 234.9 + 34.7 = 269.6 fe => 230 Sx @ 1.17 fe/sk
System:
230 Sx Class G + 0.2% D046 antifoamer, 0.3% D065 dispersant and 1 % SOOI accelerator @ 15.8
PPG yielding 1.17 felsk
7" Intermediate Casine: run to 12285' MD 16962' TVD
Cement from 12285' MD to +1- 11156' MD (minimum 500' MD above top of Alpine C Formation) with Class G
+ adds @ 15.8 PPG. Assume 40% excess annular volume.
Tail:
(12285' - 11156') X 0.1268 fe/ft X 1.4 (40% excess) = 200.4 fe annular vol.
80' X 0.2148 fe/ft = 17.2 fe shoe joint volume
Total volume = 200.4 + 17.2 = 217.6 ft3 => 188 Sx @ 1.16 felsk
System:
188 Sx Class G + 0.2% D046 antifoamer, 0.25% D065 dispersant, 0.25% D800 retarder and 0.18%
D167 fluid loss additive @ 15.8 PPG yielding 1.16 felsk
1 By Weight Of mix Water, all other additives arä:NíU¡tMAL
--
ConocÓÁ,illips
ConocoPhillips Alaska Inc.
Colville River Unit
Alpine CD1
Plan: CD1-11
CD1-11
Plan: CD1-11 (wp02)
Standard Planning Report
13 September, 2004
ORIGINAL
~
ConocoPhillips Alaska Inc.
Engineering
Calculation Method:
Error System:
Scan Method:
Error Surface:
Warning Method:
ConocóPhillips
Project: Colville River Unit
Site: Alpine CD1
Well: Plan: CD1-11
Well bore: CD1-11
Plan: CD1-11 (wp02)
-
-
-
-
0
-
-
-
-
·750
-1500
-
-
-2250
-3000
ê
:5
~ -3750
0
Ll)
,--
"+
?:: -4500
t
0
Z
--:-
?:: -5250
"5
0
(f)
-6000
-6750
-7500
-8250
-
-9000
-
-
-
-
Alpine
Minimum Curvature
ISCWSA
Elliptical Conic
Rules Based
Trav. Cylinder North
Approved Plan
I
p ~ JHL -- 2=3~t i~;L 3< 2TnH IFEl. SeeS- T111N+15E I
~S+- _ - - - - - _ _ _ _ - - Begin Dir @3.oo: 2OO.010ft,200.01Oft
~~ - - - - - - - - Cont1nue Dir @ 4~00 : 6OO.01~, 597.092ft I
1__ _____ I I I I
I --
I 1 ""- Erd Dir, Start Sail @ 57.62.: 1742.54Oft, 1510.795ft
I : ~ 9-&'8" clsg PI... Drill' out 8-1/2" Hole: 3343.052ft, 2368.000ft
I I ~._ _ _ _ _ -
--- --ï-
I I
I I "'-
i i i ~
i! i ~
I I I '"
i j ¡ ~~
¡ i ¡ ~~
:: : Begin Dir @ 4.00: 11407.58Oft,6687.215ft ~
::: I I -r----- --~"
: -: - T T 1 -1 - - - - -~
I I I 7" Csg PI... Begin 6-1/8" hole: 12285.000ft, 6961.73Oft -- Continue Dir : '\
f- - - - ~ - - _1- - - - - I- - - - t - - - - + - - - - 4- - - - - 4- - - - - -4 - - - - ~ ..:-::.. ---- .:; ::..~-....- ~ _ ---
'f ì ì ì 1 _--J-----l--------:- - Thl~
Target (Hee!) Continue Dir. 12405.1100, 6966.000ft, {1ü34ft FNL, 402ft FEL, Sec9?·T11N-R5E I II
'! I I,
I : :: ~~
I II \\
I II \\'
! ! ! ¡¡ "
I I :;: "\~' ·1
I I II I
i I I II I I
¡ I II
¡ ¡ I _ _ ,,:L - - - - - ,/,/ r \ I
Target (Tfe): 15784.7,200, 6968.000ft ,(4005ft FNl' 4077ft FIEL' S;C1O-TI11~-R5E I ,/,/,/ : \ I
! : :: CD1-11 (Toe) ~en Hole
I I T T T T T T T T T , T T·, I I I I I I I I I I I I I
~~,
r-
I
I
I
I:
[I
I
I
I
CD1-11 (Heel) §'
/- I î
I 0 I
QI
~
ë
(t
ã:
I
I
I
II
jl
I
I
I
I
I
II
II
Ii
Ii
Íi
I
I
I
I
I I
()
750
2250
3000
5250
6750
8250
9750
3750
4500
6000
7500
9000
1500
West(-)/East(+) (1500 fVin)
SECTION DETAILS
See MD he AzI TVD +NI-S +EI-W DLeg TFace VSec Target
1 36.500 0.00 0.00 36.500 0.000 0.000 0.00 0.00 0.000
2 200.000 0.00 0.00 200.000 0.000 0.000 0.00 0.00 0.000
3 600.000 12.00 133.00 597.082 -28.463 30.523 3.00 133.00 41.728
4 1742.534 57.62 126.71 1510.791 -418.739 530.968 4.00 -7.43 672.770
5 11407.572 57.62 126.71 6687.211 -5297.350 7074.422 0.00 0.00 8767.830 SpSI'I'\I-sun
6 12405.118 89.97 151.47 6966.000 -6016.633 7674.784 4.00 40.77 9699.435 CD1-11 (Heel)
7 15784.728 89.97 151.46 6968.000 -8985.665 9289.283 0.00 -89.9812924.123 CD1·11 (Toe)
DRtL.L.ING s Ii-A vi c1æ~s
A Il\I..LIIlt'RTQS CO\II'A.'S
'~Ph··· '·1111II
Conoco . I IpS
ConocoPhillips Alaska Inc.
Engineering
Calculation Method:
Error System:
Scan Method:
Alpine
Minimum Curvature
ISCWSA
Trav. Cylinder North
10JJ
~O
vC9,
O'/:>
~~
'/}
Project: Colville River Unit
Site: Alpine CD1
Well: Plan: CD1-11
Wellbore: CD1-11
Plan: CD1-11 (wp02)
o
- -it- ~ SHL·- 293ft FNL & 2Tr7f! FEl., Sees- T11N-R5E
- ~.. - .
- 1 I I
- - ----- ----- - Begin Dir @ 3.00 : 200.010ft,200.01Oft
- I I I
-
- - -----I t----- Continue Dir @ 4.00: 600.0100, 597.092ft
I I I
i~ I I I
End Dir, Start Sail @ 57.62: 1742.54Oft, 151D.795ft
- -- - I I
-- -- - r
I ¡~ I I
I 9-518" Csg Pt... Drill out 8-1/2" Hole: 3343.052ft, 2368.000ft
- If I
- I '" -----1 I ! I
¡...<.. .. I , '- - ..... ..... .. j
...-!.- --- 1'__- _ ;.. _ _ _ _ _ _ _ ~ - I I I I I
- ... I I I I I I I I I I
- J~ - - .... ::1 I : ~
-
- I I ~ ~ Ñ
I , ¡~ a.
- I ~
- ... ¡r I ,
... I
... ... I "'" 0
... -
r·· .,;......c. '" .··u.·. '. ..... I....... .. :........ ........... .. ..........'" ¡....... ....... ..... . .... .., ". . .' I ..' I .. .... I . I I .... I I I I I ;; I
r:" :.: ...... ;.. : .....,........ ..... ...... :..... K····· i i I I I i i i ¡ i i i
.."- 1- _ 0
... ~... r . I .'. ... ~
... - . I Ü
... ... I ¡..:
... ... T I ~ I I I ta
- ã:
- I I I I
- I: I I ~ \
- I I 7" Csg Pt... Begin 6-118" hole: 12285.000ft, 6961.73Oft - Continue Dlr
·1
- I I .......... ~ \ I
... ... I; I \ I
... I \ I
... '" I I \ I Open Hole
... ;:;-~ll J I ..... ...... i········ .'. ~.... \ I \1
..... \
-~... I I . I ! ~ \ I t
..:. ....... .,: .... .~... ... ..J, .. ....... ·····~I·········· ".;', ·····························r······················dl ........... .... ··r·· ..............d·······I···f ...... ....... '·11·· . .'. \ I I I I I r\CD1-~1 1 I
I CD1-11 (Heel) (Toe)
-I ~-,. _--- '. ...~ I ......'1
: :--::: :::::.:::;c;; ·'"~'1- ··········r ". ·····r.r.r.lf .1 . ·f··1. .... 'fu ... .... r .... \ I I ! ! ! I \ I ! !
~.,.=-=,..;.'~:.¡~,..;....,~.;;;~~ ';;;'''';'~''';':;;:;- ~f,';;'1·"';'~·';;'-·;;'·{;;';" ;;;'·;",-.·~r;;;'.;", .;;.- ,..;.:-;... ;:.:..;;.-:,..;.-...,;... - ¡..;- - - -1-;"'- -- 1-"';' -;... -.1- -- I '" . : \ I
:-1--:" .:1..·... ,! '! ....i! ··.·.r.[ .!.). ·1 ..!'..!' ! . I~~ I»'" ·.··1 ! ! L14/ ,,W
r "1-: ~ ...~1:::- ---~ ~ - - - -l- - - r ~~e~(~~I;~n~n~:D~~~2~~ft~6~ft~(;~;~I=~ ;£.:~':;T~1~'~5~ -::f ~--- ~ = f-~ -='J~::f~~: ~;~ft, 6~, (~OO5ftFNL, l077ft FËL,~~;1~~~
I-
I
I I I, ~ I I I I.. ~ _I I I 1 I 1 1 I 1 1 I 1 I I I I 1 I I I I I I I I I I I I I I I I 1 I I I I I I I I I I I I I I I I I 1 I 1 1 I I I I I I
(
750
1500
2250
3000
5250
6000
6750
I
I
I
-750
", 0
... '7.52
1500
2250
3000
3750
4500
5250
6000
6750
7500
8250
9000
9750
10500
11250
12000
12750
13500
SECTION DETAILS
See MD Inc AzI TVD +NI-S +EI-W DLeg TFace VSec Target
1 36.500 0.00 0.00 36.500 0.000 0.000 0.00 0.00 0.000
2 200.000 0.00 0.00 200.000 0.000 0.000 0.00 0.00 0.000
spar"r"'\(-SUn 3 600.000 12.00 133.00 597.082 -28.463 30.523 3.00 133.00 41.728
4 1742.534 57.62 126.71 1510.791 -418.739 530.968 4.00 -7.43 672.770
º Ft 1.b.6!NG ... ..§.Ê.fU!J.Ç.;.sá 5 11407.572 57.62 126.71 6687.211 -5297.350 7074.422 0.00 0.00 8767.830
6 12405.118 89.97 151.47 6966.000 -6016.633 7674.784 4.00 40.77 9699.435 CD1-11 (Heel)
A M,I,Hlol'I\'I'n,~ co~.u':~~·" 7 15784.728 89.97 151.46 6968.000 -8985.665 9289.283 0.00 -89.9812924.123 CD1-11 (Toe)
-r/
ConocoPhillips
SPERRY_SUN HES
Planning Report
Database:
Company:
Pr(jjEict:
Slt&:
Well:
W@IU.)Orø:
Design:
EDM 2003.11 Single User Db
ConocoPhillips Alaska Inc.
Colville River Unit
Alpine C01
Plan: C01-11
C01-11
CD1-11 (wp02)
Local..Co-ordinateReJe rence;
¡YD Reference:
MDRëference:
North Reference:
Survey Calcuªijðri~ethOc;i:
Well Plan: CD1-11 - Slot CD1_11
CD1 (Planning RKB) @ 56' @ 56.000ft (C01 (Planning RKB)
CD1 (Planning RKB) @ 56' @ 56.000ft (C01 (Planning RKB)
True 1
Minimum Curvature
Colville River Unit, North Slope Alaska, United States
Map System:
Geo Datum:
Map Zone:
US State Plane 1927 (Exact solution)
NAD '1927 (NADCON CONUS)
Alaska Zone 04
System Datum:
Mean Sea Level
Using Well Reference Point
Using geodetic scale factor
,Site
Alpine C01
0.000 ft
Northing:
Easting:
Slot Radius:
5,975,904.92°ft
385,999.990 ft
0"
Latitude:
Longitude:
Grid Convergence:
700 20' 34.922" N
1500 55' 30.868" W
-0.87 0
Site Position:
From:
Position Uncertainty:
Map
I"X'U
¡ Well Position
!
I Position Uncertainty
Plan: C01-11 - Slot C01_11
+N/·S
+E/-W
0.000 ft
0.000 ft
0.000 ft
Northing:
Easting:
Wellhead Elevation:
5,975,834.197 ft
385,929.303 ft
ft
Latitude:
Longitude:
Ground Level:
700 20' 34.216" N
150055' 32.901" W
0.000 ft
I Wellbora
I
I
I
i
!
CD'í-11
23.95
Declination
CO)
; Design
Audit Notes:
Version:
5 Phase: PLAN Tie On Depth: 36.500
+N/-S +Ef-W Direction
(ft) eft) e}
0.000 0.000 134.05
¡ Vertical Section:
. Plan Sections
Measured Verticat Dogleg Build Turn
Depth Inclinatíon Azimuth Depth +N¡:S +E/·W Rate Rate Rate TFO
(ft) (0) CO) (ft) eft) eft} e/100ft} (0/100ft) (0/100ft) e) Target
36.500 0.00 0.00 36.500 0.000 0.000 0.00 0.00 0.00 0.00
200.000 0.00 0.00 200.000 0.000 0.000 0.00 0.00 0.00 0.00
600.000 12.00 133.00 597.082 -28.463 30.523 3.00 3.00 0.00 133.00
1,742.534 57.62 126.71 1,510.791 -418.739 530.968 4.00 3.99 -0.55 -7.43
11,407.572 57.62 126.71 6,687.211 -5,297.350 7,074.422 0.00 0.00 0.00 0.00
12,405.118 89.97 151.47 6,966.000 -6,016.633 7.674.784 4.00 3.24 2.48 40.77 CD1-11 (Heel)
15,784.728 89.97 151.46 6,968.000 -8,985.665 9,289.283 0.00 0.00 0.00 -89.98 C01-11 (Toe)
9/13/2004 8:34:40AM
Page 2 of 7
COMPASS 2003.11 Build 38
o RI!eÅ~t-fuL:!.:. n
N~.f ~¥ 1~~J1 H .
Conoc~illips
SPERRY_SUN HES
Planning Report
..~
'-'
Database:
CQl11pany:
P@Etct
Site:
Well:
Wellbore:
Design:
EDM 2003.11 Single User Db
ConocoPhillips Alaska Inc.
Colville River Unit
Alpine CD1
Plan: CD1-11
CD1-11
CD1-11 (wp02)
Local Co-ordinate Reference:
TVD Reference:
MD Reference:
North Reference:
Survey Calculation Method:
Well Plan: CD1-11 - Slot CD1_11
CD1 (Planning RKB) @ 56' @ 56.000ft (CD1 (Planning RKB)
CD1 (Planning RKB) @ 56' @ 56.0000 (CD1 (Planning RKB)
True
Minimum Curvature
Measured Vertical Vertical Dogleg. Build Tum
Depth Inclination Depth +N/-5 +E/-W Section Rate Rate Rate
(ft) CO) (ft) (ft) (ft) (ft) (OMODft) (0110Oft) (01100ft)
36.500 0.00 0.00 36.500 0.000 0.000 0.000 0.00 0.00 0.00
SHL -- 293ft FNL & 2777ft FEL, Sec5-T11N-R5E ,/
100.000 0.00 0.00 100.000 0.000 0.000 0.000 0.00 0.00 0.00
200.000 0.00 0.00 200.000 0.000 0.000 0.000 0.00 0.00 0.00
Begin Dlr @ 3.00: 200.010ft,200.010ft
300.000 3.00 133.00 299.954 -1.785 1.914 2.617 3.00 3.00 0.00
400.000 6.00 133.00 399.635 -7.135 7.652 10.461 3.00 3.00 0.00
500.000 9.00 133.00 498.768 -16.036 17.197 23.510 3.00 3.00 0.00
600.000 12.00 133.00 597.082 -28.463 30.523 41.728 3.00 3.00 0.00
Continue Dir @ 4..00 : 600.010ft, 597.092ft
700.000 15.97 131.12 694.098 -44.609 48.499 65.874 4.00 3.97 -1.88
800.000 19.96 129.98 789.203 -64.633 71.954 96.654 4.00 3.98 -1.14
900.000 23.95 129.20 881.933 -88.436 100.772 133.917 4.00 3.99 -0.78
1,000.000 27.94 128.64 971.836 -115.904 134.814 177.482 4.00 3.99 -0.57
1,100.000 31.94 128.20 1,058.475 -146.901 173.914 227.137 4.00 3.99 -0.43
1,200.000 35.93 127.86 1,141.427 -181.278 217.881 282.639 4.00 4.00 -0.35
1,300.000 39.93 127.57 1,220.289 -218.866 266.501 343.719 4.00 4.00 -0.29
1,400.000 43.92 127.33 1,294.675 -259.483 319.537 410.078 4.00 4.00 -0.24
1,500.000 47.92 127.12 1,364.225 -302.931 376.731 481.394 4.00 4.00 -0.21
1,600.000 51.92 126.94 1,428.598 -348.997 437.804 557.319 4.00 4.00 -0.18
1,700.000 55.92 126.77 1,487.481 -397.458 502.459 637.483 4.00 4.00 -0.16
1,742.534 57.62 126.71 1,510.791 -418.739 530.968 672.770 4.00 4.00 -0.15
End Dir, Start Sail @ 57.62: 1742.540ft, 1510.795ft
1,800.000 57.62 126.71 1,541.569 -447.746 569.874 720.901 0.00 0.00 0.00
1,900.000 57.62 126.71 1,595.127 -498.223 637.576 804.657 0.00 0.00 0.00
2,000.000 57.62 126.71 1,648.685 -548.700 705.278 888.413 0.00 0.00 0.00
2,100.000 57.62 126.71 1,702.244 -599.177 772.981 972.169 0.00 0.00 0.00
2,200.000 57.62 126.71 1,755.802 -649.654 840.683 1,055.926 0.00 0.00 0.00
2,300.000 57.62 126.71 1,809.360 -700.130 908.385 1,139.682 0.00 0.00 0.00
2,400.000 57.62 126.71 1,862.918 -750.607 976.088 1,223.438 0.00 0.00 0.00
2,500.000 57.62 126.71 1,916.476 -801.084 1,043.790 1,307.194 0.00 0.00 0.00
2,600.000 57.62 126.71 1,970.035 -851.561 1,111.492 1,390.950 0.00 0.00 0.00
2,700.000 57.62 126.71 2,023.593 -902.038 1,179.194 1,474.706 0.00 0.00 0.00
2,800.000 57.62 126.71 2,077.151 -952.515 1,246.897 1,558.462 0.00 0.00 0.00
2,900.000 57.62 126.71 2,130.709 -1,002.992 1,314.599 1,642.218 0.00 0.00 0.00
2,993.899 57.62 126.71 2,181.000 -1,050.389 1,378.171 1,720.865 0.00 0.00 0.00
C-40
3,000.000 57.62 126.71 2,184.267 -1,053.469 1,382.301 1,725.974 0.00 0.00 0.00
3,100.000 57.62 126.71 2,237.826 -1,103.946 1,450.004 1,809.731 0.00 0.00 0.00
3,200.000 57.62 126.71 2,291.384 -1,154.423 1,517.706 1,893.487 0.00 0.00 0.00
3,300.000 57.62 126.71 2,344.942 -1,204.899 1,585.408 1,977.243 0.00 0.00 0.00
3,343.052 57.62 126.71 2,368.000 -1,226.631 1,614.556 2,013.302 0.00 0.00 0.00
9-5IS" Csg pt... Drill out 8-1/2" Hole: 3343.052ft, 236S,000ft- 95/8"
3,361.724 57.62 126.71 2,378.000 -1,236.056 1 ,627.197 2,028.940 0.00 0.00 0.00
C-30
3,400.000 57.62 126.71 2,398.500 -1,255.376 1,653.111 2,060.999 0.00 0.00 0.00
3,500.000 57.62 126.71 2,452.058 -1,305.853 1,720.813 2,144.755 0.00 0.00 0.00
3,600.000 57.62 126.71 2,505.617 -1,356.330 1,788.515 2,228.511 0.00 0.00 0.00
3,700.000 57.62 126.71 2,559.175 -1,406.807 1,856.218 2,312.267 0.00 0.00 0.00
3,800.000 57.62 126.71 2,612.733 -1,457.284 1,923.920 2,396.023 0.00 0.00 0.00
3,900.000 57.62 126.71 2,666.291 -1,507.761 1,991.622 2,479.780 0.00 0.00 0.00
4,000.000 57.62 126.71 2,719.849 -1,558.238 2,059.325 2,563.536 0.00 0.00 0.00
9/13/2004 8:34:40AM Page 3 of7 COMPASS 2003.11 Build 38
ORIGINAL'
~/ SPERRY - SUN HES
ConocoPhillips Planning Report
Datäbue: EDM 2003.11 Single User Db Local Co-ordinäteRefételicè: Well Plan: CD1-11 - Slot CD1 - 11
COmp~!)y: ConocoPhillips Alaska Inc. 'TVDRefèrence: C01 (Planning RKB) @ 56' @ 56.000ft (C01 (Planning RKB)
Pr()jE¢~ Colville River Unit MDuRefèrenee: C01 (Planning RKB) @ 56' @ 56.000ft (C01 (Planning RKB)
Sit&: Alpine C01 North Reference: True
Well: Plan: C01-11 Survey Calculation Method: Minimum Curvature
Wellbore: CD1-11
~$jgn:: C01-11 (wp02)
57.62 126.71 2,768.000 -1.603.618 2,120.191 2,638.835 0.00 0.00 0.00
57.62 126.71 2,773.408 -1.608.715 2,127.027 2,647.292 0.00 0.00 0.00
57.62 126.71 2,826.966 -1,659.192 2,194.729 2,731.048 0.00 0.00 0.00
57.62 126.71 2,880.524 -1,709.668 2,262.431 2,814.804 0.00 0.00 0.00
57.62 126.71 2,934.082 -1.760.145 2,330.134 2,898.560 0.00 0.00 0.00
4,500.000 57.62 126.71 2,987.640 -1.810.622 2,397.836 2,982.316 0.00 0.00 0.00
4,600.000 57.62 126.71 3,041.199 -1.861.099 2,465.538 3,066.072 0.00 0.00 0.00
4,700.000 57.62 126.71 3,094.757 -1.911.576 2,533.241 3,149.829 0.00 0.00 0.00
4,800.000 57.62 126.71 3,148.315 -1,962.053 2,600.943 3,233.585 0.00 0.00 0.00
4,900.000 57.62 126.71 3,201.873 -2.012.530 2,668.645 3,317.341 0.00 0.00 0.00
5,000.000 57.62 126.71 3,255.431 -2,063.007 2,736.348 3,401.097 0.00 0.00 0.00
5,100.000 57.62 126.71 3,308.989 -2,113.484 2,804.050 3,484.853 0.00 0.00 0.00
5,200.000 57.62 126.71 3,362.548 -2,163.961 2,871.752 3,568.609 0.00 0.00 0.00
5,300.000 57.62 126.71 3,416.106 -2,214.437 2,939.455 3,652.365 0.00 0.00 0.00
5,400.000 57.62 126.71 3,469.664 -2,264.914 3,007.157 3,736.121 0.00 0.00 0.00
5,500.000 57.62 126.71 3,523.222 -2,315.391 3,074.859 3,819.878 0.00 0.00 0.00
5,600.000 57.62 126.71 3,576.780 -2,365.868 3,142.561 3,903.634 0.00 0.00 0.00
5,700.000 57.62 126.71 3,630.339 -2,416.345 3,210.264 3,987.390 0.00 0.00 0.00
5,800.000 57.62 126.71 3,683.897 -2,466.822 3,277.966 4,071.146 0.00 0.00 0.00
5,900.000 57.62 126.71 3,737.455 -2,517.299 3,345.668 4,154.902 0.00 0.00 0.00
6,000.000 57.62 126.71 3,791.013 -2,567.776 3,413.371 4,238.658 0.00 0.00 0.00
6,016.779 57.62 126.71 3,800.000 -2,576.245 3,424.731 4,252.712 0.00 0.00 0.00
K-3 MARKER
6,100.000 57.62 126.71 3,844.571 -2,618.253 3,481.073 4,322.414 0.00 0.00 0.00
6,200.000 57.62 126.71 3,898.130 -2,668.730 3,548.775 4,406.170 0.00 0.00 0.00
6,300.000 57.62 126.71 3,951.688 -2,719.206 3,616.478 4,489.926 0.00 0.00 0.00
6,365.932 57.62 126.71 3,987.000 -2,752.487 3,661.115 4,545.149 0.00 0.00 0.00
BASAL K·3 55
6,400.000 57.62 126.71 4,005.246 -2,769.683 3,684.180 4,573.683 0.00 0.00 0.00
6,446.219 57.62 126.71 4,030.000 -2,793.013 3,715.471 4,612.394 0.00 0.00 0.00
K-2 MARKER
6,500.000 57.62 126.71 4,058.804 -2,820.160 3,751.882 4,657.439 0.00 0.00 0.00
6,600.000 57.62 126.71 4,112.362 -2,870.637 3,819.585 4,741.195 0.00 0.00 0.00
6,672.141 57.62 126.71 4,151.000 -2,907.052 3,868.426 4,801.618 0.00 0.00 0.00
BASE K·2SEQUENCE
6,700.000 57.62 126.71 4,165.921 -2,921.114 3,887.287 4,824.951 0.00 0.00 0.00
6,800.000 57.62 126.71 4,219.479 -2,971.591 3,954.989 4,908.707 0.00 0.00 0.00
6,900.000 57.62 126.71 4,273.037 -3,022.068 4,022.691 4,992.463 0.00 0.00 0.00
7,000.000 57.62 126.71 4,326.595 -3,072.545 4,090.394 5,076.219 0.00 0.00 0.00
7,100.000 57.62 126.71 4,380.153 -3,123.022 4,158.096 5,159.975 0.00 0.00 0.00
7,200.000 57.62 126.71 4,433.712 -3,173.498 4,225.798 5,243.732 0.00 0.00 0.00
7,300.000 57.62 126.71 4,487.270 -3,223.975 4,293.501 5,327.488 0.00 0.00 0.00
7,400.000 57.62 126.71 4,540.828 -3,274.452 4,361.203 5,411.244 0.00 0.00 0.00
7,500.000 57.62 126.71 4,594.386 -3,324.929 4,428.905 5,495.000 0.00 0.00 0.00
7,600.000 57.62 126.71 4,647.944 -3,375.406 4,496.608 5,578.756 0.00 0.00 0.00
7,700.000 57.62 126.71 4,701.503 -3,425.883 4,564.310 5,662.512 0.00 0.00 0.00
7.800.000 57.62 126.71 4,755.061 -3,476.360 4,632.012 5,746.268 0.00 0.00 0.00
7.900.000 57.62 126.71 4,808.619 -3,526.837 4,699.715 5,830.024 0.00 0.00 0.00
8,000.000 57.62 126.71 4,862.177 -3,577.314 4,767.417 5,913.781 0.00 0.00 0.00
8,100.000 57.62 126.71 4,915.735 -3,627.791 4,835.119 5,997.537 0.00 0.00 0.00
8,200.000 57.62 126.71 4,969.293 -3,678.267 4,902.821 6,081.293 0.00 0.00 0.00
8.300.000 57.62 126.71 5,022.852 -3,728.744 4,970.524 6,165.049 0.00 0.00 0.00
8,400.000 57.62 126.71 5,076.410 -3,779.221 5,038.226 6,248.805 0.00 0.00 0.00
8,500.000 57.62 126.71 5.129.968 -3,829.698 5,105.928 6,332.561 0.00 0.00 0.00
8,600.000 57.62 126.71 5,183.526 -3,880.175 5,173.631 6,416.317 0.00 0.00 0.00
8,700.000 57.62 126.71 5,237.084 -3,930.652 5,241.333 6,500.073 0.00 0.00 0.00
8,800.000 57.62 126.71 5,290.643 -3,981.129 5,309.035 6,583.829 0.00 0.00 0.00
9/13/2004 8:34:40AM Page 4 of 7 COMPASS 2003. 11 Build 38
ORJS~¡Nl1[j: -{
Conoc~illips '- SPERRY_SUN HES -
Planning Report
Database: EDM 2003.11 Single User Db Well Plan: CD1-11 - Slot CD1_11
Compðny: ConocoPhillips Alaska Inc. (Planning RKB) @ 56' @ 56.000ft (CD1 (Planning RKB)
Project: Colville River Unit (Planning RKB) @ 56' @ 56.0000 (CD1 (Planning RKB)
Site: Alpine CD1
Well: Plan: CD1-11
Wellbore: CD1-11
D&sign: CD1-11 (wp02)
8,900.000 57.62 126.71 5,344.201 0.00 0.00 0.00
9,000.000 57.62 126.71 5,397.759 0.00 0.00 0.00
9,100.000 57.62 126.71 5,451.317 -4,132.560 5,512.142 6,835.098 0.00 0.00 0.00
9,200.000 57.62 126.71 5,504.875 -4,183.036 5,579.845 6,918.854 0.00 0.00 0.00
9,300.000 57.62 126.71 5,558.434 -4,233.513 5,647.547 7,002.610 0.00 0.00 0.00
9,400.000 57.62 126.71 5,611.992 -4,283.990 5,715.249 7,086.366 0.00 0.00 0.00
9,500.000 57.62 126.71 5,665.550 -4,334.467 5,782.951 7,170.122 0.00 0.00 0.00
9,600.000 57.62 126.71 5,719.108 -4,384.944 5,850.654 7,253.878 0.00 0.00 0.00
9,700.000 57.62 126.71 5,772.666 -4,435.421 5,918.356 7,337.635 0.00 0.00 0.00
9,800.000 57.62 126.71 5,826.225 -4,485.898 5,986.058 7,421.391 0.00 0.00 0.00
9,900.000 57.62 126.71 5,879.783 -4,536.375 6,053.761 7,505.147 0.00 0.00 0.00
9,958.287 57.62 126.71 5,911.000 -4,565.796 6,093.222 7,553.965 0.00 0.00 0.00
ALBIAN 97
10,000.000 57.62 126.71 5,933.341 -4,586.852 6,121.463 7,588.903 0.00 0.00 0.00
10,100.000 57.62 126.71 5,986.899 -4,637.329 6,189.165 7,672.659 0.00 0.00 0.00
10,200.000 57.62 126.71 6,040.457 -4,687.805 6,256.868 7,756.415 0.00 0.00 0.00
10,300.000 57.62 126.71 6,094.016 -4,738.282 6,324.570 7,840.171 0.00 0.00 0.00
10,400.000 57.62 126.71 6,147.574 -4,788.759 6,392.272 7,923.927 0.00 0.00 0.00
10,441.873 57.62 126.71 6,170.000 -4,809.895 6,420.621 7,958.998 0.00 0.00 0.00
ALBIAN 96
10,500.000 57.62 126.71 6,201.132 -4,839.236 6,459.975 8,007.684 0.00 0.00 0.00
10,600.000 57.62 126.71 6,254.690 -4,889.713 6,527.677 8,091.440 0.00 0.00 0.00
10,700.000 57.62 126.71 6,308.248 -4,940.190 6,595.379 8,175.196 0.00 0.00 0.00
10,800.000 57.62 126.71 6,361.807 -4,990.667 6,663.082 8,258.952 0.00 0.00 0.00
10,900.000 57.62 126.71 6,415.365 -5,041.144 6,730.784 8,342.708 0.00 0.00 0.00
11,000.000 57.62 126.71 6,468.923 -5,091.621 6,798.486 8,426.464 0.00 0.00 0.00
11,024.417 57.62 126.71 6,482.000 -5,103.945 6,815.017 8,446.915 0.00 0.00 0.00
TOP HRZ
11,100.000 57.62 126.71 6,522.481 -5,142.098 6,866.188 8,510.220 0.00 0.00 0.00
11,200.000 57.62 126.71 6,576.039 -5,192.574 6,933.891 8,593.976 0.00 0.00 0.00
11,300.000 57.62 126.71 6,629.597 -5,243.051 7,001.593 8,677.733 0.00 0.00 0.00
11,302.619 57.62 126.71 6,631.000 -5,244.373 7,003.366 8,679.926 0.00 0.00 0.00
BASE HRZ
11,400.000 57.62 126.71 6,683.156 -5,293.528 7,069.295 8,761.489 0.00 0.00 0.00
11,403.444 57.62 126.71 6,685.000 -5,295.266 7,071.627 8,764.373 0.00 0.00 0.00
K-1 MARKER
11,407.572 57.62 126.71 6,687.211 -5,297.350 7,074.422 8,767.830 0.00 0.00 0.00
Begin Dir @ 4.00 : 11407.580ft,6687.215ft
11,494.393 60.27 129.32 6,732.000 -5,343.163 7,132.994 8,841.782 4.00 3.06 3.01
TOP KUPARUK
11,500.000 60.45 129.48 6,734.773 -5,346.256 7,136.760 8,846.639 3.97 3.07 2.90
11,591.707 63.31 132.08 6,778.000 -5,399.093 7,197.973 8,927.372 4.00 3.12 2.84
LCU
11,600.000 63.57 132.31 6,781.708 -5,404.076 7,203.468 8,934.786 3.98 3.13 2.74
11,700.000 66.75 134.99 6,823.719 -5,466.720 7,269.093 9,025.508 4.00 3.18 2.68
11,800.000 69.97 137.54 6,860.602 -5,533.885 7,333.315 9,118.366 4.00 3.22 2.55
11,899.388 73.20 139.98 6,892.000 -5,604.794 7,395.445 9,212.322 4.00 3.26 2.45
MILUVEACH A
11,900.000 73.22 140.00 6,892.177 -5,605.243 7,395.822 9,212.905 3.69 3.02 2.22
12,000.000 76.50 142.36 6,918.290 -5,680.446 7,456.308 9,308.665 4.00 3.28 2.37
12,020.697 77.19 142.85 6,923.000 -5,696.458 7,468.547 9,328.595 4.01 3.30 2.33
ALPINE D
12,100.000 79.81 144.67 6,938.813 -5,759.127 7,514.479 9,405.181 4.00 3.30 2.30
12,112.614 80.23 144.96 6,941.000 -5,769.280 7,521.638 9,417.385 4.02 3.33 2.28
ALPINE C
12,200.000 83.13 146.92 6,953.648 -5,840.905 7,570.052 9,501.981 4.00 3.32 2.25
9/13/2004 8:34:40AM Page 5 of 7 COMPASS 2003.11 Build 38
ORIGINAL
...,../ .
ConocoPhillips
SPERRY_SUN HES
Planning Report
Database:
Company:
Proj~ct;
Site:
Well:
Well bore:
Qè'sign:
EDM 2003.11 Single User Db
ConocoPhillips Alaska Inc.
Col'¡ille River Unit
Alpi:le CD1
Plan: CD1-11
CD1-11
CD1-11 (wp02)
Local CCJ"OrdihateReference:
TVD Referencè:
MDReference:
North Reference:
Survey Calculation Methöd:
Well Plan: CD1-11 - Slot CD1_11
CD1 (Planning RKB) @ 56' @ 56.000ft (CD1 (Planning RKB)
CD1 (Planning RKB) @ 56' @ 56.000ft (CD1 (Planning RKB)
True
Minimum Curvature
12,285.000 85.96 148.82 6,961.730 -5,912.552 4.00 3.33 2.23
7" Csg pt ... Begin 6-1/8" hole: 12285.000ft, 6961.730ft .. Continue Dir - 7"
12,300.000 86.46 149.15 6,962.721 -5,925.379 7,622.756 9,598.594 3.99 3.32 2.21
12,400.000 89.80 151.36 6,965.989 -6.012.139 7,672.335 9,694.550 4.00 3,34 2.21
12,405.118 89.97 151.47 6,966.000 -6.016.633 7,674.784 9,699.435 4.00 3.34 2.21
Target (Heel) Continue Dir, 12405.11 Oft, 6966.000ft, (1 034ft FNL, 402ft FEL, Sec9?·T11 N·R5E - CD1-11 (Heel)
12,500.000 89.97 151.47 6,966.056 -6.099.993 7,720.100 9,789.963 0.00 0.00 0.00
12,600.000 89,97 151.47 6,966,115 -6,187,850 7,767.862 9,885.376 0,00 0.00 0,00
12,700.000 89,97 151.47 6,966.175 -6,275,707 7,815.624 9,980,789 0.00 0.00 0.00
12,800,000 89,97 151.47 6,966.234 -6,363,563 7,863,387 10,076,202 0,00 0.00 0.00
12,900.000 89,97 151.47 6,966.293 -6,451.418 7,911.151 10,171.615 0,00 0.00 0.00
13,000,000 89.97 151.47 6,966.352 -6,539,274 7,958.915 10,267.028 0.00 0.00 0.00
13,100.000 89,97 151.47 6,966.411 -6,627,129 8,006.680 10,362.442 0,00 0.00 0.00
13,200.000 89.97 151.47 6,966.470 -6,714.983 8,054.446 10,457.856 0.00 0.00 0.00
13,300.000 89.97 151.47 6,966.530 -6,802.838 8,102.212 10,553.270 0.00 0.00 0.00
13,400.000 89,97 151.47 6,966.589 -6,890.692 8,149.979 10,648.684 0.00 0.00 0.00
13,500,000 89.97 151.47 6,966,648 -6,978,545 8,197,746 10,744.099 0.00 0.00 0,00
13,600.000 89,97 151.47 6,966.707 -7,066.399 8,245.515 10,839.514 0.00 0.00 0.00
13,700.000 89,97 151.47 6,966.766 -7,154,251 8,293.283 10,934,929 0.00 0.00 0,00
13,800.000 89.97 151.46 6,966.826 -7,242,104 8,341,053 11,030,344 0.00 0,00 0.00
13,900.000 89,97 151 .46 6,966.885 -7,329.956 8,388.823 11,125.759 0.00 0,00 0.00
14,000.000 89.97 151 .46 6,966.944 -7,417.808 8,436.594 11,221.175 0.00 0.00 0,00
14,100,000 89,97 151.46 6,967,003 -7,505.660 8,484,365 11,316,591 0.00 0,00 0,00
14,200,000 89,97 1 51 .46 6,967,062 -7,593.511 8,532.138 11,412.007 0.00 0.00 0.00
14,300.000 89.97 151.46 6,967.121 -7,681,361 8,579,910 11,507.423 0,00 0,00 0,00
14,400.000 89.97 1 51 .46 6,967.181 -7,769.212 8,627.684 11,602.840 0,00 0.00 0,00
14,500.000 89.97 1 51 .46 6,967.240 -7,857.062 8,675.458 11,698.257 0.00 0.00 0.00
14,600.000 89.97 151.46 6,967.299 -7,944.912 8,723.233 11,793,674 0.00 0,00 0.00
14,700.000 89.97 151.46 6,967.358 -8,032,761 8,771,008 11,889,091 0.00 0.00 0.00
14,800.000 89,97 151.46 6,967.417 -8,120.610 8,818.784 11,984,508 0.00 0.00 0.00
14,900,000 89,97 151.46 6,967.476 -8,208.459 8,866.561 12,079.926 0,00 0.00 0,00
15,000.000 89,97 151.46 6,967.536 -8,296.307 8,914.338 12,175,344 0.00 0.00 0.00
15,100.000 89,97 151.46 6,967.595 -8,384.155 8,962.116 12,270,762 0,00 0.00 0,00
15,200.000 89.97 151.46 6,967.654 -8,472.003 9,009.895 12,366,180 0,00 0,00 0.00
15,300.000 89.97 151.46 6,967.713 -8,559,850 9,057,674 12,461.599 0.00 0.00 0.00
15,400.000 89.97 1 51 .46 6,967.772 -8,647.697 9,105.454 12,557.018 0,00 0.00 0,00
15,500.000 89.97 151.46 6,967.832 -8,735,543 9,153.234 12,652.437 0,00 0.00 0.00
15,600.000 89,97 151.46 6,967.891 -8,823.389 9,201,016 12,747.856 0.00 0.00 0.00
15,700.000 89,97 151 .46 6,967.950 -8,911.235 9,248.797 12,843.275 0.00 0.00 0.00
15,784.728 89.97 151.46 6,968,000 -8,985.665 9,289,283 12,924,123 0,00 0,00 0.00
Target (Toe) : 15784.720ft, 6968.000ft, (4005ft FNL, 4077ft FEL, Sec10-T11N·R5E· Open Hole· CD1-11 (Toe)
: Target Name
. hit/miss target
- Shape
Latitude
Longitude
CD1-11 (Heel) 0.00 0,00 6.966,000 -6,016,633 7,674.784 5,969,702,000
- plan hits target
- Rectangle (sides W3,379 000 H200.000 00.000)
393,511.000
70" 19' 35.004" N 150" 51' 48.870" W
CD1-11 (Toe)
- plan hits target
- Point
0.00
0.00 6,968.000 -8.985.665 9,289.283 5,966,709.000
395,080.000
70019' 05.786" N 150051' 01.850" W
9/13/2004 8:34:40AM
o ~ .~,GiNA.L
COMPASS 2003.11 Build 38
·~
'-'~
ConocJÃ,illips
SPERRY_SUN HES
Planning Report
Database:
Company:
Prøject
SIt8:
Wèll:
Wellbore:
Design:
EDM 2003.11 Single User Db
ConocoPhillips Alaska Inc.
Colville River Unit
Alpine CD1
Plan: CD1-11
CD1-11
CD1-11 (wp02)
Well Plan: CD1-11- SlotCD1_11
CD 1 (Planning RKB) @ 56' @ 56.000ft (CD1 (Planning RKB)
CD1 (Planning RKB) @ 56' @ 56.000ft (CD1 (Planning RKB)
True
Minimum Curvature
C~si'\gPolnts
Measul"8d
~pth
(ft)
3,343.052
12,285.000
15,784.700
Local Co-ordinate Reference:
TVD Reference:
MD Reference:
North Reference:
Survey Calculation Method:
Vertical
Depth .
(ft)
2,368.000
6,961.730
6,968.000 Open Hole
Cuing
Diameter
('T
9-5/8
7
6-1/8
Hole
Diameter
("I
12-1/4
8-112
6-1/8
2,993.899
3,361.724
4,089.903
6,016.779
6,365.932
6,446.219
6,672.141
9,958.287
10,441.873
11,024.417
11,302.619
11,403.444
11,494.393
11,591.707
11,899.388
12,020.697
12,112.614
:!#4~~~nO~~o~~
Measured
" D~pth
(ft) .
36.500
200.010
600.010
1,742.540
3,343.052
11,407.580
12,285.000
12,405.110
15,784.720
Dip
Depth Name Lithology Dip Direction
(ft) to) r)
2,181.000 C-40 0.00
2,378.000 C-30 0.00
2,768.000 C-20 0.00
3,800.000 K-3 MARKER 0.00
3,987.000 BASAL K-3 SS 0.00
4,030.000 K-2 MARKER 0.00
4,151.000 BASE K-2 SEQUENCE 0.00
5,911.000 ALBIAN 97 0.00
6,170.000 ALBIAN 96 0.00
6,482.000 TOP HRZ 0.00
6,631.000 BASE HRZ 0.00
6,685.000 K-1 MARKER 0.00
6,732.000 TOP KUPARUK 0.00
6,778.000 LCU 0.00
6,892.000 MILUVEACH A 0.00
6,923.000 ALPINE D 0.00
6,941.000 ALPINE C 0.00
Vertical
Depth
(ft)
36.500
200.010
597.092
1,510.795
2,368.000
6,687.215
6,961.730
6,966.000
6,968.000
Local Coordinates .
+NJ-S+E/·W
(ft) (ft)
0.000 0.000
0.000 0.000
-28.465 30.525
-418.742 530.972
-1,226.631 1,614.556
-5,297.354 7,074.427
-5,912.552 7,615.044
-6,016.626 7,674.779
-8,985.658 9,289.279
SHL - 293ft FNL & 2777ft FEL, SeeS- T11 N-R5E
Begin Dir @ 3.00 : 200.01 Oft,200.01 Oft
Continue Dir@4.00 : 600.01 Oft, 597.092ft
End Dir, Start Sail @ 57.62: 1742.540ft, 1510.795ft
9-5/8" Csg Pt... Drill out 8-1/2" Hole: 3343.052ft, 2368.000ft
Begin Dir @ 4.00 : 11407.580ft,6687.215ft
7" Csg Pt... Begin 6-1/8" hole: 12285.000ft, 6961.730ft- Continue Dir
Target (Heel) Continue Dir, 12405.110ft, 6966.000ft, (1034ft FNL, 402ft FEL, Se
Target (Toe) : 15784.720ft, 6968.000ft, (4005ft FNL, 4077ft FEL, Sec1 0- T11 N-F
. COITIRumf,
9/13/2004 8:34:40AM
COMPASS 2003. 11 Build 38
Page 7 of 7
ORIGINAL
of W-S +EJ-W
Northing ElISth19
ltttlttu~
Longlb.ldð CD1_' 1 ~ot
ConocoPhillîps Alaska Inc.
150-5S'32.oo1W
Engineering
Alpine
Calculation Method: Minimum Curvature
Error System: ISCWSA
Scan Method: Trav. Cytinder North
Error Surface: Elliptical Conic
Warning Method: Rules Based
~.'....'~~----------.~~VEY 'RO(;RAM
D"le: 2004-09-IWHMI:00:00 V"lid"'"d: Yes Version: S.(HMI
DClllh From nellh To Survt'yfl'l:m Tool
36.StMI 1250.000 CDJ-11 (WI,02) CB-GYRO-SS
12.'i0'(MMI 15784.72R COI-II (wp02) MWI)+IFR·AK·CA7~SC
l.__
.--.-..-----------,...------,.---
- ---_._--"-----_._---~_._----_._.,-,_..-
o
:;Q
2š
~
~
~
~
.1.,..-' . ..;::
CD1-09
CDI·1
CDI·I:!
CDI If.
CDI·lt-
C01-08
PI.;
I
¡
/
/'
/
/
,/
..~//".
......
I
//
/
/
CD1-19
150
180
____.____~~~~~_~~~lJL~~:Y.~~~_~er ~!~~~_t.!~~!~~~~~~!2..CJ. VS Cel~re to ~~ntre Separa~~n [50 ftlin]
----...,-.-----.---------,..--...-----.-..,..-,-------...-..--------------
SgCTION DETAILS
S<:(' MO Ine A1.i TVO +N/-S +.E/-W Dug TFace VSc<;
1 :~.5IHI 0.00 0.00 36.500 0.000 II.IIIMI 0.00 0.00 0.000
2 21MUHHI OJMI O.IHI 2IMI'(HHI O.!MMI OJUMI 0.00 0.00 O.(HHI
J 600.000 12,/MI LHIMI 597.082 -28.46J :l0.52J 3.00 03.00 41.72R
4 1742.534 57.62 126.71 1510.791 -418.739 530.968 4.00 -7.43 672.770
5 11407.572 57.62 126.71 6687.211 -5297.350 7074.422 0.00 O.IHI 8767.830
Ii 12405.118 89.97 151.47 69M.OIHI -6016.6.1.1 7674.784 4.IHI 441.77 %99.435
7 15784.72R 8').97 t51.4(i 6%8.000 ·8985.665 92R9.2R.' O.IHI -89.98 12924.12.\
Targct
CI)I-11 (Ht,eI)
CIH-11 (Toe)
. . . -,-----,-_._-
--,----_._--"._"._-
From Colour To MD
60
37 - 300
300 - 400
400 500
500 750
750 1000
1000 1250
1250 1500
1500 1750
1750 2000
2000 3000
3000 - 4000
4000 5000
5000 - 6000
6000 7000
7000 -- 8000
8000 9000
9000 - 10000
10000 - 11000
11000 - 12000
12000 13000
13000 14000
14000 15000
15000 -..-- 16000
90
120
I
ANTI-COLLISION SETTINGS
Interpolation Method:
Depth Range From:
MD Interval: 25' Stations
36.500 To 15784.728
Reference:
Maximum Range: 1774.8'
Scanned frolu Surface to TD
CD1-09
I
CDH 0
90
C01-13
2
Plan: CD,., 1 (vt~)
Travelling Cylinder Azimuth (TFO+AZI) [0] vs Centre to Centre Separation [10 Mn]
('tDJ-II (wp-02) Approved Plan
""-'
"---'
ConocJPhillips
ConocoPhillips Alaska Inc.
Colville River Unit
Alpine CD1
Plan: CD1-11
CD1-11
CD1-11 (wp02)
Travelling Cylinder Report
13 September, 2004
ORIGINAt '
..............-
ConocoPhillips
SPERRY_SUN HES
Anticollision Report
C()J11pahY:
Pr()jept:
ReferéliceSite:
SitéEri'ô'r:
Reference.Well:
WelfEttot:
Re:feren¢êWèllbofé
Referencê-D~igl1:
ConocoPhillips Alaska Inc.
Colville River Unit
Alpine CD1
O.OOOft
Plan: CD1-11
O.OOOft
CD1-11
CD1-11 (wp02)
CD1-11 (wp02)
Filter type: GLOBAL FILTER:
Interpolation Method: MD Interval 25.000ft
Depth Range: Unlimited
Results Limited by: Maximum center-center distance of 1,774.823ft
LocalCoc..ortfinateRefetence:
TVDReferèl1ce:
MD Reference:
North Reference:
SUrvey. CaICUlatîöJ'tMethod:
04tputerrorsarëàt· . .
Data~se:
OffsetTVD Reference:··
Well Plan: CD1-11 - Slot CD1_11
CD1 (Planning RKB) @ 56' @ 56.000ft (CD1 (Planning I
CD1 (Planning RKB) @ 56' @ 56.000ft (CD1 (Planning I
True
Minimum Curvature
1.00 sigma
EDM 2003.11 Single User Db
. Offset Datum
Error Model:
Scan Method:
Error Surface:
ISCWSA
Trav. Cylinder North
Elliptical Conic
Survey Tool Program
From To
(ft) (ft)
36.500
1,250.000
1,250.000 CD1-11 (wp02) (CD1-11)
15,784.728 CD1-11 (wp02) (CD1-11)
CB-GYRO-SS
MWD+IFR-AK-CAZ-SC
Camera based gyro single shot
MWD+IFR AK CAZ SCC
CC - Min centre to center distance or covergent point, SF - min separation factor, ES - min ellipse separation
9/13/200411:12:26AM Page 2of237 COMPASS 2003.11 Build 38
ORIG'INÄ:L
ConocóP'hillips
.---
CQf11pany:
Pr()iøct:
RèferènceSite:
Site Error:
Reference Well:
Well Error:
Ref~renceWellbore
ReferenèeDesign:
ConocoPhillips Alaska Inc.
Colville River Unit
Alpine CD1
O.OOOft
Plan: CD1-11
O.OOOft
CD1-11
CD1-11 (wp02)
Súnunary
SPERRY_SUN HES
Anticollision Report
'~--'
Local Co-ordinate Reference:
TVD Reference:
MD Reference:
North Reference:
Survey Calculation Method:
Output errors are at
Database:
Offset TVD Reference:
Well Plan: CD1-11 - Slot CD1_11
CD1 (Planning RKB) @ 56' @ 56.000ft (CD1 (Planning I
CD1 (Planning RKB) @ 56' @ 56.000ft (CD1 (Planning I
True
Minimum Curvature
1.00 sigma
EDM 2003.11 Single User Db
Offset Datum
Reference Offset Centre to No-Go Allowable
Measured Measured Centre Dìstánce Deviation Warning
SiteNarnè Depth Depth Distance (ft) frornPlan .
OffsèfWen -Wellbore, -Design (ft) (ft) (ft) (ft)
Alpine CD1
CD1-01-CD1-01-CD1-01 275.248 275.000 99.832 4.29 95.539 Pass - Major Risk
CD1-01 - CD1-01 PB1 - CD1-01 PB1 275.248 275.000 99.832 4.29 95.539 Pass - Major Risk
CD1-02 - CD1-02 - CD1-02 299.728 300.000 90.592 5.02 85.570 Pass - Major Risk
CD1-03 - CD1-03 - CD1-03 324.458 325.000 80.123 5.13 74.995 Pass - Major Risk
CD1-04 - CD1-04 - C[11-04 225.218 225.000 70.778 3.94 66.840 Pass - Major Risk
CD1-05 - CD1-05 - CD1-05 349.814 350.000 59.167 5.08 54.087 Pass - Major Risk
CD1-05 - CD1-05PB1 - CD1-05PB1 349.814 350.000 59.167 5.08 54.087 Pass - Major Risk
CD1-06 - CD1-06 - CD1-06 324.895 325.000 50 .701 5.23 45.476 Pass - Major Risk
CD1-06- CD1-06PB1 - CD1-06PB1 324.895 325.000 50.701 5.23 45.476 Pass - Major Risk
CD1-07 - CD1-07 - CD1-07 299.596 300.000 41.835 5.68 36.156 Pass - Major Risk
CD1-07 - CD1-07PB1 - CD1-07PB1 299.596 300.000 41.835 5.68 36.156 Pass - Major Risk
CD1-07 - CD1-07PB2 - CD1-07PB2 299.596 300.000 41.835 5.68 36.156 Pass - Major Risk
CD1-08 - CD1-08 - CD1-08 300.480 300.000 30.747 5.49 25.261 Pass - Major Risk
CD1-09 - CD1- 09PB1 - CD1- 09PB1 624.389 625.000 17 .083 10.30 6.781 Pass - Major Risk
CD1-09 - CD1-09 - CD1-09 624.389 625.000 17.083 10.30 6.781 Pass - Major Risk
CD1-10 - CD1-10 - CD1-10 299.751 300.000 10.131 4.96 5.172 Pass - Major Risk
CD1-13 - CD1-13 - CD1-13 349.350 350.000 20.023 5.41 14.612 Pass - Major Risk
CD1-14 - CD1-14 - CD1-14 1 ,152.045 1,150.000 33.174 25.22 7.952 Pass - Major Risk
CD1-14 - CD1-14 PB1 - CD1-14 PB1 1,152.045 1,150.000 33.174 25.22 7.952 Pass - Major Risk
CD1-16 - CD1-16 - CD1-16 598.281 600.000 46.836 9.72 37.118 Pass - Major Risk
CD1-16 - CD1-16PB1 - CD1-16PB1 598.281 600.000 46.836 9.72 37.118 Pass - Major Risk
CD1-17 - CD1-17 - CD1-17 448.641 450.000 59.680 6.86 52.820 Pass - Major Risk
CD1-19 - CD1-19 - CD1-19 346.797 350.000 81.141 5.25 75.893 Pass - Major Risk
CD1-19 - CD1-19A - CD1-19A 349.204 350.000 81.171 5.28 75.893 Pass - Major Risk
CD1-21 - CD1-21 - CD1-21 348.945 350.000 100.052 5.54 94.510 Pass - Major Risk
CD1-21 - CD1-21 L 1 - CD1-21 L 1 348.945 350.000 100.052 5.65 94.401 Pass - Major Risk
CD1-21 - CD1-21 PB1 - CD1-21 PB 1 348.945 350.000 100.052 5.65 94.401 Pass - Major Risk
CD1-22 - CD1-22 - CD1-22 374.197 375.000 111 .534 5.85 105.689 Pass - Major Risk
CD1-22 - CD1-22A - CD1-22A 374.197 375.000 111.534 5.85 105.689 Pass - Major Risk
CD1-229 (aka NQ1) - CD1-229 - CD1-229 174.943 175.000 180.166 2.96 177 .207 Pass - Major Risk
CD1-229 (aka NQ1) - CD1-229 PB1 - CD1-229 PB' 174.943 175.000 180.166 2.96 177.207 Pass - Major Risk
CD1-23 - CD1-23 - CD1-23 954.686 975.000 1 01 .477 17.44 84.036 Pass - Major Risk
CD1-24 - CD1-24 - CD1-24 689.033 700.000 134.772 10.64 124.127 Pass - Major Risk
CD1-25 - CD1-25 - CD1-25 473.605 475.000 140.755 6.89 133.864 Pass - Major Risk
CD1-26 - CD1-26 - CD1-26 548.051 550.000 154.122 8.30 145.825 Pass - Major Risk
CD1-26 - CD1-26PB1 - CD1-26PB1 548.051 550.000 154.122 8.30 145.825 Pass - Major Risk
CD1-27 - CD1-27 - CD1-27 249.700 250.000 160.297 4.17 156.128 Pass - Major Risk
CD1-28 - CD1-28 - CD1-28 422.918 425.000 167.468 6.60 160.865 Pass - Major Risk
CD1-28 - CD1-28 PB1 - CD1-28 PB1 422.918 425.000 167.468 6.60 160.865 Pass - Major Risk
CD1-3O - CD1-3O - CD1-30 200.185 200.000 190.528 3.64 186.886 Pass - Major Risk
CD1-3O - CD1-3O PB1 - CD1-3O PB1 200.185 200.000 190.528 3.64 186.886 Pass - Major Risk
CD1~1-CD1~1 -CD1~1 643.041 650.000 197.192 9.90 187.295 Pass - Major Risk
CD1-31 - CD1-31 CAZ - CD1-31 CAZ 643.037 650.000 197.169 9.91 187.262 Pass - Major Risk
CD1-31 - CD1-31 IIFR - CD1-31 IIFR 643.036 650.000 197.165 9.91 187.252 Pass - Major Risk
CD1-32 - CD1-32 - CD1-32 399.187 400.000 209.999 5.46 204.534 Pass - Major Risk
CD 1 -32 - CD 1-32 P B 1 - CD 1 -32 P B 1 399.187 400.000 209.999 5.46 204.534 Pass - Major Risk
CD1-33 - CD1-33 - CD1-33 619.028 625.000 222.807 9.61 213.197 Pass - Major Risk
CD1-34 - CD1-34 - CD1-34 299.575 300.000 230.331 4.63 225.703 Pass - Major Risk
CD1-35 - CD1-35 - CD1-35 224.437 225.000 240.026 3.70 236.329 Pass - Major Risk
CD1-36 - CD1-36 - CD1-36 199.845 200.000 250.724 3.51 247.212 Pass - Major Risk
CD1-36 - CD1-36 PB1 - CD1-36 PB1 199.845 200.000 250.724 3.51 247.212 Pass - Major Risk
CD1-37 - CD1-37 - CD1-37 349.088 350.000 260.342 5.30 255.040 Pass - Major Risk
Plan: CD1-12 - CD1-12 - CD1-12 relim01 299.899 300.000 10.386 5.79 4.591 Pass - Ma'or Risk
CC - Min centre to center distance or covergent point, SF - min separation factor, ES - min ellipse separation
9/13/200411:12:26AM Page 4 of 237 COMPASS 2003.11 Build 38
o R tß I, N;AÞ.f '
.,.,.../
ConocoPhillips
C·ompa.ny:
Ptón~c~:
RefèrènceSité:
SitèErtor:
ReferenceWeH:
Well Error:
ReferenceWeilbOre
Refere.nc:e. DeSign:
ConocoPhillips Alaska Inc.
Colville River Unit
Alpine CD1
O.OOOft
Plan: CD1-11
O.OOOft
CD1-11
CD1-11 (wp02)
,-summarY
I
; Site Name
¡ Offset Well - Wellbore - Design
Alpine CD1
Plan: CD1-18 - CD1-f8 - CD1-18 (prelim01)
Plan: CD1-20 - CD1-20 - CD1-20 (prelim01)
SPERRY_SUN HES
Anticollision Report
L()cal·Co-ot<iinat~Referê[}ce:
TVDReferélice:
MDReferenc:e:
North Reference:
Survey.·CalCf.jlàtlonMethod:
Output errÖfsareat
Datãbase:
OffsetTVÐRéferehce:
Well Plan: CD1-11 - Slot CD1_11
CD1 (Planning RKB) @ 56' @ 56.000ft (CD1 (Planning I
CD1 (Planning RKB) @ 56' @ 56.000ft (CD1 (Planning I
True
... Minimum Curvature
1.00 sigma
EDM 2003.11 Single User Db
Offset Datum
Réfe~en:(;e
Measured
Depth
·(ft)
Offset
Measured
Depth
(ft) .
399.120
324.778
399.998
325.000
Pass - Major Risk
Pass - Major Risk
70.798
90.202
7.31
5.70
63.488
84.503
CC - Min centre to center distance or covergent point, SF - min separation factor, ES - min ellipse separation
9/13/2004 11:12:26AM Page 5 of 237 COMPASS 2003.11 Build 38
o RI¡~rNAl '; ,
Plan: CDI-Il (wp02) (plan: CDI-IIICDI-II)
f
.o~I~: · f'r
38 IA
:: I I. \ . / - f lJl ~.
36.0-: f-~ ,- ................. /~./ ffL:"~ ... J/ \. ..T,. ·]fl
= : j ~ i " 'I... 'i If: ... ....... · . j
3;J.O--=_ '1---:---- I --- -----~.~.-- - ~- ...... // ... , /. . ---- "
, ....... ........ , I'J ..... ........ ......./J
32.~11 --1--d------:---' ./~A .... 7' .... !!:... .'. · .......·11 ................
30.~L.... 1.....1 :~~_ ~~"'-.. '.' VI'·· .. : . ;/ I
=1···· :~.: ..... : .'; ..·.·':7······. . .0..1':
28~1.1 ,. ~ i··~:·. ir;.!~:..;~/ ~ :. "..' . f· I
26~ '......+ .l'·'···'··jt.rj-+"+-'+-·'I't-'·+'··J,['I; /. j
24
I~""''''~~/ /
/..··....·......···7· ~/
.1 '. -,~-~-T I . ..
......
··11··
:f
o~
:;o.~
-~
(j')~ 22
-~
%ð 20
)::>~
r-~
()
u
:
I
.!.
-
.0--= I......··..·..
-
-
-
18.8 -
. ...1.
..., .
..............
.. .....n
r
'/~
;/
/' '
...-;+ ··.ij
-
-
16.0--= -.-.-,-
-
- .
14.O-=J2.:':'~
-
-
-
12.8 -
. .
: .
. ··.·······:1
/7
,ri!1 ·.·~11,!I,l+!1Ii¡ ..¡
.-:.¡;~~ --.- [O,,;"':, .,. " ' 'i' ..
...-.~ ¡ . ; ¡ ,j:'+i· ).!: if:
_..~
~___ . I
......·1..:.....
-
..)///
fT:r
:I'f
¡;) ..1. ...).
,.
10.0- -
- . '111'¡1+:J "I .' 'll~frl
8.~ ........... ..·~··;;;,:;;¡;;~;~!~·~~,·~..o;;d<. ...... ¡
6.~ ~..._:...:....:...j.._... ~l........
#H-l-!;
i¡lmt-IUII
¡,....,i,l, .
":':·:·1·,
.
,
I..........·.....
.... ..
....... .
'.
.; .·....1:': :::1 ,
·lIf"~tllll:1 i'"
I II I II II I I I I I I
650 700 750 800
-
4.0--:
-
-
2.8 -
,j,',,"',..1:·,'.
ltfllFh
0.8
I
I
I I
150
I
I
II I I I I I
1
I III
450
500
550
600
850
Measured Depth [ft]
250
350
400
300
200
o
50
100
1 \l'\\ e: it· ....... ,/,1/1 ....../
I . i"\~' ... , ' ....... ."/-": . '" / . .
-. ~i} .... .' ·...·..·····/·1 . ./
__ .' .. ...... ... ..¡ I·I·t-_-··· .../.......
........... .......,~........................... I j.ll! 7 ...........
............... ......\""- .............. ..... 1----·
. ........... ...... ...... . . ........\> ....., .....¡ ---TjI
..,.. ....... . .,'.' . "N-..' .. . I --+/
...¡ xl····
.. .
. ,
..11 ..
.......·.·..1. ············.1, ...... ...... ........... ...l· .1 :¡... 'J
__ : :-.:.':'. :.' ~.: :-:-.-., '..: '_, ii : :. ~J-: . ':--.
.~ ...0::-- - .,...: "','" " .~.
.
--
................¡......
.
.
........;..
.,...
.
..
I··
.
.. . . ...
-.
.
..... ...
.....
.
. .
. . . "
: ..
'. ..
,
....
.
I
/ .
'..
.,
i
; (
.
...
...
.
..... ....
.... ,.... ..e' . ..e....
.....
....... .,...,
....,
m..
.
, .....
,
.__.~-_.. --..--..-
.... .....
,
....-............. ¡;
\'(
T
. ..
.
,
...
I I I
I II I II
I
I I
II 11111 1111 I II
III
I
I
I II I 1
..... ........
..-....-.-...
._0._._.'..-... ..._._.~
\ : ! '....
;
¡
..' +. ' :! iH i····
, .
I
..... .........
"....,.."",.....,....
1000 1050 1100 1150 1200 1250 1300 1350 1400 1450 1500
. ... :..L.~.__.. .Ii
!
I
,
,¡.. 'Iiii' ,I ,i .···.·,11 ir', .'
ii
".
COI-II (wp02) - CDI.OI. CDI-OI. CDI.OI VI - CDI-OI. CDI.OIPBI. COI-OIPE!-!-¥!'" COI.02. COI-02. COI.02 V2 - COI-03, COI·03. COI·03 VI - COI·04. COI·04. COI·04 VI - COI·05, COI·05. C01-05 VI - CDI-()5. COI·05PBI. COI-05P_ COI-06, COI-06, COI.06 VI - COI.06. COI-06PBI. COI-06PBI VI
COI-07. COI-07. COI-07 V26 - COI-07. CDI-07PB!, COI-07P_ CDI-07.COI-07PB2. CDI-07P~ COI-08. COI-08. C01-08 V4 - COI·O<). COI- o<)PB!, CDI-O<)P&1-¥1 CDI·(~), CDI-o<). CDI-09 V2 - CDI·IO. COI·IO. COI-IO VI - COI-13, COI·13. CI)I-13 VI - COI-14. COI-14 GYRO, CDI·I_O(J.(DI·14, COI·14 MWO. COI.14 MWD
COI-14, COI-14 PSI MWO, C[)!-t.H'ßCOOMII>,'\I:DI-14 pBI, COI-14 P&1-¥1 CDI-14, COI-14. COI-14 VI - COI-16. COI.16, COI-16 VI - COI-16. CDI-16PßI, CDI·16PE!-!-¥!'" COI·17. COI-17. CDI-17 V2 - COI-19. CDI·19. CDI·19 V2 - CDI·19. CDI-19A, COI-19A V4- COI-21. CDI·21. CDI-21 VI - CDI-21, CDI·2ILI. COI-211.1 VI
CDI.21. COI-2IPBI. CO 1-2 I PE!-!-¥!'" CDI-22, COI-22, CDI-22 V6 - CDI-22. COI-22A. COI.22A V6- COI-229 (uku NQI), COI.229 PB-r,-eÐI-Œl!IIPliP\l1k. NQI), CDI-229. ~9 V-DI·23. COI·23. COI·23 V3 - COI·24, CI)I-24, CDI-24 V4 - COI·25, COI·25. COI·25 VI - 1:01-26. COI-26, CDI-26VI - (;DI-26. CDI-26PßI. CDI-26I'BI VI
COI-27. COI.27. COI-27 VI COI-2K, COI-28 pBI. COI-28 P&1-¥1 COI.28. COI-28, COI.28 VI COI-30. COI-30 PBI. COI·30 P&1-¥1 COI-30, COI-30, COI·30 VI COI·31. COI·31 CAZ. COI·31 (_I (;DI·31. COI·31111'1\, CDI·31Itt'ft-'o'l CDI-31. CDI·31. COI·31 V6 - CDI·32, COI-32 PßI. (;01-321'_ CO 1-32. CDI-32. COI-32 VI
COI-33. COI.33. COI-33 VI - COI.34. COI-34, COI.34 VI - COI-35. CDI-35, 1:01.35 VI - COI-36, COI·36 PßI. COI-36 PÐ1-¥i COI-36, (;DI-36, COI·36 VI - COI·37. CDI·37, (;DI-37 VS - P~tII: CDI-12, CI)I·12, COI·12 (r,",¡imOlJ'WI. (:01·18, (:01·18, (:DI-18 (rm:funOl)'\{ò: CDI·20, CDI-20. CDI·20 (I,,"till;)!) W
--...-......
'[................1:::..: ····.1, ....... ¡tjll!,': .....
.: .... . .
.
,................. ................. ...... ... ...... ............... ..:i) .:... tt¡!11;1J;' · i
I········ ....!¡ ;.
. '.' .' ····:l'f:r::..::·:::l:lJ·..:J::..!'·:r .:.....:.::: ',.. .
.... ... '. '. T'- ...
.
.
.....
..
, . ! "
. ,
,
900
950
GEOLOGIC SUMW,RY: CD1-11
1 ,"MOZ?; PRODUCTION HC Resp: SIeve Moothart - 6965 Ii!! Complete
Forrnatlo Z
n X y ITYD.SS) Porosity Perm Net Pay Preferred Tar. Angle
AlDine C
Heel Tame 393.511 5.969,702 6,910' 019 20md 50
Toe Tarael 395.080 5,966.709 6,912' 0.18 15md to
t Shepe: Reclagúar box 100' either sK]e of weflbQre i.n tt~ hoñzonta! Approx
lane Slepaut:
Remarks:
2 i1'<ßD2;') 010\ Applicable
Formallo Z
n X y ITYD.SS\ Porasltv Perm Nel Pav Preferred Tar. Anale
I
I
I
t Shape: Apprax
S\eoout:
omments:
3 """"27> ; 0Jot Applicable
FormaUo Z
n X y ITYD.SS\ Porasltv Perm Net Pav Preferred Tar. Angle
I Shape: Apprax
Stepaut:
omments:
GeoloQic PrOQn05 ResponsiJle: Steve Moolhart - 6965 Ii!! Complete
Form.stio X y Z MD Gross Net Pay Net to Gross
n (TYD.SS) Thlcknes
s
ProdœHon Hole
I
C-40 I 2 \25'
C-30 I 2,322'
C-20 I 2,712'
-,P·.I:, I::¡:, 3.744'
" ., 3,931'
~ ~ . .: ,. I: I; 3,974'
I: . :1: :':::".'I:'r.:I: 4,095'
-'_':1. , .'1 5,855'
ALBIAN 9<1 6,114'
TOP HRZ I 6.426'
BASE HRZJ 6575'
K-1 MARKER 6,629'
TOP KUPARUK 6,676'
LCU I 6,722'
I.'JLUVEACHA 6,836'
ALPINE 0 I 6.867'
ALPINE C I 6,885' 40
I
Too AlDine C M:xwe Heel 6,893'
I I
Base Aloine Balow Heel 6.933'
I
I
I
I
I
í
Remarks:
Geologic Discussion: Responsible: Steve Moothart - 69S5 Ii!! Complete
C01-11 is being driHea as tr.d off$~t irjec!Oí to the west of prcdo:-er CD1-oS. Tr..a rr.~st criûca] risk in the ·.....enbore is
roser.'oir thçi\nesslqua.!iî.y to the scu'tJ'l. Tre AI~~::e C sar:ds begf!1 to It...i.'1 aJ;j sr,a!e oL!.lo the SQli1h an-d ','last This Îs
evident P.1 Lhe 8ergsr,I1.l"d 2 ard CD1-229pb1 'M3Hs to the \'-.11351- Both CD1-Dì and COI-Qa we!1s to 11'..e easl encoll1tered
mry goc-d qæ.!ity C saf'ds ·..iÜ:h tr:lìr:5d from greater than 40' to <S'lvd after approxmate!y 3500' of r.orizo:1!af seeton
CD1-11 horizontal is p~a.r¡,.,ed for 3500'. SeislTi-cdata s!.J}gests tt':at tr.a sard thins rap~jly at the p!ar~d toe or the "..ell
The !ar.di!;:J point for tt',e horizontaJ section \'....a.s rJ"K)ved so¡Jh approximalety 500' to mis-s a potentia! do'M1:o the sotJ.h faut
In the cU'"rent pIa...., this 'aLit may b-e- eocomte¡ed pr.or to !a")jng m the o'/erly;r.-,J ~/~t!'¡eac,i1 intervaJ Feu; a-jditior-~
potentia! areas of faút1racttre-S Œr/e been tdentiried.
The first at -129&-G'md is pOSSIDiy a smaJ! d0W110 the SGi.1h falJL f'-.iext at 13800'mj is a poterAia! do't.n to :he rrorti1 fatit.
At 14100' md ~ may approach too tip of smaJl ¡jOY.n to the soL1.h faLit or assodated fractures.
The last zena ìs beyord îhe p!anr..ed weHbore by 100·200' am is a ~-Qtent~' dOi'r-rì l',) Ûì9 north f3.ut.
All these zones are near the Emits'of saism): detection a.,'"'.d r, preser~ ILkely represent !J110.....'S of less lÏ';âJ'[ 10'.
Care shoLid bo taken .'lien approolct',i,ïg U)€!se zones as dri;¡~ fit.i-Js coLid be !ost!n fauts.aJìd fraciliŒ lO:105.
Shallow inlervals:
;(3IK; ThÜ1 ir>tsr-bedded sardSfsræes may be present 1;1 ti),e basa1 portkln of the K3 a.'ìd üpper K2 intervals
(3925'-4025' sstvct). Tho sands rray be 9as cl>.arged.
NanLq; Tr~r¡ sams of poterniaJ fe{ìef",'Oir qLB..iit'l VA3re eocol.f1tered Îr¡ ttB basal portkm of the
OR
r.·1' t\tl Af..' Î
i,,·! . . >i ~...'
V·¡ ;.. ¡¡¡..,.,.
DESCRIPTION
DESCRIPTION
Per KØ3126ACS
v
Well 'y' 'X' Lot. (N) Lonq. (W) FNL FWL Gnd Pod
CD1-1 5975.9Ø4.92 385.999.99 7Ø" 2Ø' 34.922" 15Ø' 55' 3Ø.868" 222' 2 572' 13.Ø' 19.5'
CD1-2 5.975.897.89 385.992.91 7Ø" 2Ø' 34.852" 15Ø" 55' 31.Ø71" 229' 2 565' 13.Ø' 19.5'
CD1-3 5 975.89Ø.99 385.985.82 7Ø" 2Ø' 34.783" 15Ø" 55' 31.275" 236' 2558' 13.1 ' 19.5'
CD1-4 5 975.883.83 385.978.79 7Ø" 2Ø' 34.711" 15Ø" 55' 31.4 78" 243' 2551' 13.2' 19.5'
CD1-5 5 975.876.67 385.971.58 7Ø' 2Ø' 34.640" 15Ø" 55' 31.685" 251' 2544' 13.3' 19.5'
CD1-6 5 975.869.89 385 964.83 7Ø" 2Ø' 34.572" 15Ø" 55' 31.879" 258' 2538' 13.4' 19.5'
CD1- 7 5,975,862.73 385.957.33 70" 20' 34.5Ø1" 15Ø- 55' 32.Ø95" 265' 2,530' 13.3' 19.5'
CD1-8
CD1-9 5 975 848.42 385 943.41 7Ø" 2Ø' 34.358" 15Ø' 55' 32.495" 279' 2517' 13.1' 19.5'
CD1-1Ø 5.975.841.34 385.936.18 7Ø" 20' 34.287" 15Ø' 55' 32.703" 286' 2.51Ø' 13.Ø' 19.5'
CD1-11 t5ê75834.19 0385929.30 ./
CD1-12
CD1-13 5.97582Ø.0Ø 385.915. Ø6 7Ø" 20' 34.074" 15Ø' 55' 33.311" 308' 2.489' 12.7' 19.5'
CD1-14 5.975 812.97 385.908.0Ø 7Ø' 20' 34.ØØ4" 15Ø' 55' 33.514" 315' 2.482' 12.6' 19.5'
CD1-15
CD1-16 5.975.798.86 385.894.08 7Ø" 20' 33.863" 15Ø' 55' 33.914" 330' 2.468' 12.4' 19.5'
CD1-17 5 975 791.81 385 886.84 7Ø' 2Ø' 33.793" 15Ø' 55' 34.123" 337' 2.461 ' 12.3' 19.5'
CD1-18 5.975.784.91 385.879.88 70' 20' 33.724" 15Ø' 55' 34.323" 344' 2.454' 12.2' 19.5'
CD1-19 5.975 777.92 385.872.81 7Ø" 2Ø' 33.654" 150' 55' 34.526" 351' 2.447' 12.1 ' 19.5'
CD1-20 5.975.770.66 385.865.67 70" 20' 33.581" 150' 55' 34.732" 358' 2.440' 12.Ø' 19.5'
CD1- 21 5.975 763.76 385.858.49 70" 20' 33.512" 150' 55' 34.938" 365' 2.433' 11. 9' 19.5'
*CD1- 22 5,975,756.46 385,851.10 70" 20' 33.440" 15Ø- 55' 34.151" 373' 2,426' 11.9' 19.5'
CD1- 23 5.975.749.31 385.844.44 70" 2Ø' 33.368" 150- 55' 35.342" 380' 2419' 12.0' 19.5'
CD1-24 5.975.742.40 385.837.3Ø 7Ø" 2Ø' 33.299" 150' 55' 35.548" 387' 2412' 12.2' 19.5'
CD1- 25 5.975.735.34 385.83Ø.26 7Ø" 2Ø' 33.229" 15Ø- 55' 35.75Ø" 394' 2 405' 12.4' 19.5'
CD1- 26 5.975.728.1 Ø 385.823.14 7Ø" 2Ø' 33.156" 15Ø- 55' 35.955" 4Ø1' 2 398' 12.6' 19.5'
CD1- 27 5.975.721.21 385.816.Ø8 70- 2Ø' 33.Ø88" 15Ø- 55' 36.158" 408' 2391' 12.8' 19.5'
CD1-28 5.975.714.15 385.809.1 Ø 7Ø- 20' 33.017" 150' 55' 36.359" 416' 2384' 13.Ø' 19.5'
CD1- 29 5.975.7Ø7.14 385.802.2Ø 7Ø" 2Ø' 32.947" 15Ø- 55' 36.558" 422' 2377' 13.2' 19.5'
CD1-3Ø 5.975.7ØØ.17 385.794.75 7Ø" 2Ø' 32.877" 15Ø' 55' 36.772" 430' 2 37Ø' 13.4' 19.5'
CD1-31 5.975.692.73 385.787.4Ø 7Ø" 20' 32.8Ø3" 15Ø' 55' 36.984" 437' 2.362' 13.3' 19.5'
CD1-32 5.975.685.92 385.78Ø.68 70" 2Ø' 32.735" 15Ø- 55' 37.177" 444' 2.356' 13.2' 19.5'
CD1-33 5.975.678.67 385.773.79 7Ø" 2Ø' 32.663" 15Ø' 55' 37.375" 452' 2.349' 13.1 ' 19.5'
CD1-34 5.975.671.88 385.766.54 7Ø" 2Ø' 32.595" 15Ø' 55' 37.584" 459' 2.342' 12.9' 19.5'
CD1-35 5 975.664.72 385.759.63 7Ø" 2Ø' 32.524" 15Ø' 55' 37.782" 466' 2.335' 12.9' 19.5'
CD1-36 5.975.657.49 385.752.52 7Ø' 20' 32.451" 15Ø" 55' 37.987" 473' 2.328' 12.8' 19.5'
CD1-37 5 975.65Ø.51 385 745.4Ø 7Ø' 2Ø' 32.381" 15Ø- 55' 38.191" 48Ø' 2.321 ' 12.7' 19.5'
CD1-38 5.975.643.79 385 738.44 70" 2Ø' 32.315" 15Ø' 55' 38.391" 487' 2.314' 12.6' 19.5'
CD1-39 5 975 636.34 385 731.37 7Ø" 2Ø' 32.24Ø" 15Ø" 55' 38.595" 495' 2.3Ø7' 12.5' 19.5'
CD1-4Ø 5975629.19 385 724.32 70' 2Ø' 32.168" 15Ø" 55' 38.797" 502' 2.3ØØ' 12.4' 19.5'
CD1-41 5.975 622.37 385.717.4Ø 7Ø" 2Ø' 32.1 Ø1 " 15Ø" 55' 38.997" 509' 2.293' 12.3' 19.5'
CD1-42 5.975615.01 385 71 Ø.21 7Ø" 2Ø' 32.Ø27" 15Ø" 55' 39.204" 516' 2.286' 12.2' 19.5'
CD1-43 5.9756Ø7.63 385.702.97 70' 2Ø' 31.954" 150" 55' 39.412" 523' 2.279' 12.1' 19.5'
CD1-44 5.9756ØØ.75 385 696.ØØ 70" 2Ø' 31.885" 15Ø' 55' 39.613" 531' 2.272' 12.1' 19.5'
CD1-45 5,975,593.74 385,689.04 70" 2Ø' 31.815" 15Ø" 55' 39.813" 538' 2,265' 12.Ø' 19.5'
CD1-46 5,975,586.84 385,681.76 70" 2Ø' 31.746" 150" 55' 4Ø.022" 545' 2,258' 12.2' 19.5'
CD1-47 5,975,579.96 385,674.74 7Ø" 20' 31.677" 15Ø" 55' 4Ø.224" 552' 2,251' 12.1 ' 19.5'
CD1-48 5,975,572.62 385,667.53 7Ø" 20' 31.6Ø4" 15Ø" 55' 40.432" 559' 2,244' 12.0' 19.5'
CD1-49 5,975,565.51 385,66Ø.62 7Ø" 20' 31.533" 15Ø" 55' 4Ø.630" 566' 2,237' 12.0' 19.5'
* CD1-22 CONDUCTOR WAS AS-BUlL T 2/11/98.
ConocJP'hillips
Alaska, Inc.
CADD FILE NO. DRAWING NO:
LK663D1 3
ALPINE MODULE: CD1Ø
ALPINE PROJECT
CD1 WELL CONDUCTORS
ASBUIL T LOCATIONS
CE -C01 0-66301 PART: 2 OF 3
UNIT: CD
REV:
6
ORIGINAL
CRU D1-11
Injec, or
2041$00
SFD 9115/2004
Feet
o 1 ,000
3,000 4,':;00
ConocoPhillips Alaska, Inc..
Post Office Box 100360
Anchorage, Alaska 99510-0360
Telephone 907-276-1215
September 14, 2004
.
ConocJP'hiiii pS
Alaska Oil and Gas Conservation Commission
333 West ¡th Avenue, Suite 100
Anchorage, Alaska 99501
RECEIVED
SEP 1 5 2004
Re: Application for Permit to Drill
CD1-11
Alaska Oil & Gas Cons. Commission
Anchorage
Dear Sir or Madam:
ConocoPhillips Alaska, Inc. hereby applies for a Permit to Drill an onshore injection well
from the Alpine CD2 drilling pad. The intended spud date for this well is October 23rd,
2004. It is intended that Doyon Rig 19 drill the well.
The intermediate section of CD1-11 will be drilled and landed in the Alpine sand
horizontally; 7" casing will then be run and cemented in place. CD1-11 will be
completed as an open hole injector. At the end of the work program the well will be shut
in awaiting surface connection. - ./
./
Note that it is planned to drill the surface hole without a diverter. There have been 40
wells drilled on CD1 p~d and 43 wells ç!rilled on CD2 pad with no significant indication oT
gas or shallow gas hydrates. While drilling two surface hole sections (CD1-07 and CD1-
46) drilled this year, mud logging services were used and there were no significant
indications of gas. One section of well CD1-07 showed up to 751 units of gas in the 0/
depth interval from 1390 to 1420 ft md. There were no measured gains in mud pit
volumes associated with the gas.
It is also requested that the packer placement requirement be relaxed to place the
packer 200 ft TVD above the Alpine formation. This will place the completion at a
maximum inclination less than 65 degrees, and allow access to the completion with
standard wìreline tools for future intervention.
Further, ConocoPhilips, Alaska Inc. requests 14 days are allowed between BOPE
testing intervals. Any well control instance in which the BOP equipment is utilized to ~
control flow will be reported to the AOGCC promptly.
Please find attached the information required by 20 ACC 25.005 (a) and (c) for
your review. Pertinent information attached to this application includes the
following:
1. Form 1 0-401 APPLICATION FOR Permit to Drill per 20 ACC 25.005 (a).
2. Fee of $100 payable to the State of Alaska per 20 ACC 25.005 (c) (1).
3. A proposed drilling program
4. A drilling fluids program summary.
5. Proposed completion diagram.
6. Pressure information as required by 20 ACC 25.035 (d)(2).
7. Directional drilling / collision avoidance information as required by 20 ACC 25.050
(b).
Information pertinent to this application that is presently on file at the AOGCC is:
.
.
1. Diagrams of the BOP equipment, diverter equipment and choke manifold layout as
required by 20 ACC 25.035 (a) and (b).
2. A description of the drilling fluids handling system.
3. Diagram of riser setup which replaces diverter
If you have any questions or require further information, please contact Vern Johnson or
lane Kuenzler at 265-6081 or 265-1308, respectively. Chip Alvord can also be reached
by calling 265-6120.
Sincerely,
7~ ýJ,~/b~
lane Ku;&ler·· ~
Drilling Engineer
Attachments
cc:
CD1-11 Well File / Sharon Allsup Drake
Chip Alvord
Vern Johnson/lane Kuenzler
Cliff Crabtree
Steve Moothart/Jeff Yeaton
Nancy Lambert
Lanston Chin
e-mail:
ATO 1530
ATO 1700
A TO 1702/1704
ATO 1768
A TO 1756/1752
Anadarko - Houston
Kuukpik Corporation
Tommy_Thompson @anadarko.com
·
e
g
~
MEIV/O__
':0;) . .00
---.
-
c., CHASE
U\'.'IEf".';'ll
SHARON K. ALLSUP-DRAKE
CONOCOPHILLIPS
ATO 1530
700 G STREET
ANCHORAGE AI( 99501
PAY TO THE
ORDER OF.
.
.
TRANSMIT AL LETTER CHECK LIST
CIRCLE APPROPRlA TE LETTER/P ARAGRAPHS TO
BE INCLUDED IN TRANSMITTAL LETTER
WELL NAME e,ea C!Þ/-/I
PTD# Wt/- /&6
Exploration
Stratigraphic
./ Development
V Service
CHECKWHAT ADD-ONS ~'CLUEn
APPLJES (OPTIONS)
MULTI Tbe permit is for a new weUboresegment of
LATERAL existing well ,
Permit No, API No. .
(If API number Production.sbould continue to be reponed as
last two. (2) digits a function· of tbe original API number. stated
are between 60-69) above.
Pn,OT HOLE In accordance with 20 AAC 25.005(f), an
(PH) records, data and logs acquired for tbe pilot
bole must be dearly differentiated In botb
name (name on permit plus PH)
.' and API number (SO -
70/80) from records, data and logs acquired
for well (name on permit).
SPACING Tbe permit is approved subject ·to fuD
EXCEPTION compliance with 20 AAC 2S..05S~ Approval to
perforate and produce is contingent upon
issuance of ~ conservation order approving a
spacing e:J ception.
(Company Name) assumes tbe liability of any
protest to tbe spacing .e:Jception tbat may
occur.
DRY DITCH All dry ditcb sample sets submitted to tbe
SAMPLE Commission must be in no greater ·tban 30'
sample intervab from below tbe permafrost
or from where samples are first caugbt and
] 0' sample inter:vals tbrougb target zones.
COLVILLE RIVER, ALPINE OIL - 120100 Well Name: OLVILLE RIV UNIT CD1-11 Program SER Well bore seg 0
ALASKA INC Initial Classrrype SER I PEND GeoArea 890 Unit 50360 On/Off Shore On Annular Disposal 0
Administration · Y~s - - - - - - - -
2 .Leas.e .number .appropn<lte. . - - - - Y~s · . . Surtace locaiion in AD!. .2555.9~ top prod interv~L & TD inAQL37209,5..
3 .U.nique weILn.ame.a!ld oumb.er . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Yes - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - . . - - - - - - - - - - - - - --
4 Well JOC<lted in.a.d.efine.dpool. . Yes · . . CQlvilleRiver Uoit, AIJjineOJI Pool, goyeroedb.YG.Q 443.
5 WellJoc<lted pr9perdistance. from driJling unitb.oundary. . Yes - - - - - - - -
6 Well Joc<lted pr9per .distance. from other wells. . . . . . Yes - - - - - - - --
7 .Sufficientacreage.aYail<lble indJilJiog unit. Yes - - - -
8 RdeviC!ted, is. weJlbore plC!UncJu.ded . Y~s - - --
9 .Qper.ator only: affected party. . . Yes - - - - - - - - -
10 .0J>e(ator has.appr9priate.bond inJorce . . . . . . . . . . . . . . . . . . . . . . . . Yes - - - - - - - - - - - - - - - - - - - . - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - . - - - - - - - - - -
11 Permit GéI!l be issued without co.nservaiion Qrder. . . Y~s - - - - -
Appr Date 12 Permitca!l be issued without C!clministrati\(e.aJjpr9vaJ . . . Yes - - - - - - - - - - - .. .
SFD 9/16/2004 13 Can permit be approved before 15-day wait Yes .
14 WellJoc<lted withir¡ C!rea and.strat<l .authorized by lojectioo Order # (PuUO# in.c9mmeots). (fQr Yes · . Governed by: AIO.t8A. .
15 AJI wells. within .1 l4.miLe.area.of reyiew ideot[fied (For &ervic.e.wellonly:). . . . . . . . . . . . . . . yes . . . . . f'>Qn.eJie withilJ 114 mjle . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . - - - - - - - - - -
16 Pre-produced i!ljectQr; dur<ltio.nof pre-produGtiolJ less. than 3 montbs. (for.service well QnJy) . . No.
17 ACMP finding .of CQn.siJ>tencyhas been .issued. for. tbis pr.oject . NA · . Will be .drilled from .an e)j:isting pad. . .
Engineering 18 .Co!lductor stringpJovided . . . Yes
19 .Surfac.e casing pJotecis alLknowl1 USOWs . NA · . . f'>o aquifers, per AIO 18, conclusio.n3, . - - - -
20 .CMT voL adequate. to circ.ulate on .cOlJductor. & $UJf. CJ>g . . Yes - - - - - - -- - - - -
21 .CMTv.ol adeQuateto tie-in Jong .stri!lg to.surf csg. . . . N.o. · . . AlJnular disp.osal ultimately plaOlJed..
22 .CMT. will coyera]l klJow.nproductiye /JorilQns. . .N.o · . Open hole completion JjLanlJe.dc - - --
23 C.asiog designs ad.equa.te fpr CoT., B .&. permafr9S! . . · Yes - - - - - .. .
24 AJ:!equ<ltetankage. OJ reserve pit . . . . . . . . .Yes · . Rig is e.quippe.d.witb J>teelpits.. No rese.nle.pitJ>lanoed, Wastelo apprQved armulus or. disposal well, .
25 Jf.a.re-drilt hasa to-40;3 for <lbandonment been <lPPJQved . .NA
26 A.dequ<lte.,^,e!lbore sepC!rationJ>roJjosed. . . . . . . . . . . . . . . . . . . ....yes . . . . . I?r9)j:imity: an<llysiS pertorme.d, Jrayelin9 cy:lioder pat/J calcu!ate.d. ßyr.os PQs.siÞLe. . . . . . . . . . . . . . . . . . . .
27 Jf.diverter required, does it meet reguJations. . · .NA. · . DiyertersJare1y .used.ai Alpine.. CQn.tiOllo.US drjlling. has nOUlJdiGélted presen.ce of. any siglJifiq¡ot.g<ls..
Appr Date 28 .DJilIiog fluid. program schematic 8. equiJj .list.aJ:!equ<lte · Yes · . Maximum expected fprmaiion pressure.8,7.EMW.. MW planned 9.6-9c8.pJjg in8.-t/2nholeand 9.0-9..6.ppg in.Alpin
TEM 9/29/2004 29 .BOP.~s,. do they meet reguJatiolJ . Yes - - - - - - - - - - - - -- .
tJi,4vJ\ 30 .BOPE.press ratiog apJjropriate;test to (put psig incommelJts) . · .Y~s · . MASI=' calculate.d.at 2456 Jjsi, 35QOpJ>iaJjpropriate..CPAJ usu<llJy.tests tp50QO.psl. .
31 C.hokemanjfQld cQmpJies w/API RF'-53lMay 84) . . Yes
32 Work will occur withoYloperation .sbutdow.n. . . Yes
33 .Is presence. of H2S gas. probable. . . . . . . .N.o. - - - - - - - -
34 .Meç/Ja.n[caICOlJd.itio!l9f wells within AOR verified (For.s.ervice welJ onJy) Yes f'>o wells identified with.in 1/4 mjle. . - - ~ - - - - - -
Geology 35 Permit. ca!l be issued wlo bydrogen. s.uLfide measures. . . Yes - - -- - - - -
36 .D.ata.pJeseoted Qn. pote.ntia/ oveJpressurezoneJ>. . .. Yes · . Expected reservoir J>re.sSUJe is .8,7.ppg EMW; wilLbe .drilled witb 8.8,9.6 ppg mud. .
Appr Date 37 .Seismic.analysjs of shaJIQW gaszooes. NA CQver /etteJ nQtes Z54units. Qf gas. ilJ CD1-07 frQm j 390' -.10420';CDj -P7 was drilled in same direction Jrom
- - - -
SFD 9/16/2004 38 .SeC!bed .conditipo surve.Y(if Qff-sh9re) . . · .NA . same.sjde.of pa.d, ß.as bydrates.mitigation. rnea.sures disc;usseJ:!.i1l Drilling .H<lzaJdsSum.mary:.
39 . CQnta.ct nam.elphOlle.for.,^,eekly progressreports [exploratory .only]. NA.
- -
Geologic Date: Engineering Date Date
Commissioner: Commissioner: /Ýý'd~
DJ's 1'1:50 /<1--
e
e
Well Histol)' File
APPENDIX
Information of detailed nature that is not
particularly germane to the Well Permitting Process
but is part of the history file.
To improve the readability of the Well History file and to
simplify finding information. information of this
nature is accumulated at the end of the file under APPENDIX.
No special effort has been made to chronologically
organize this category of information.
Sperry-Sun Dri4ltng Services
LIS Scan Utility
$Revision: 3 $
LisLib $Revision: 4 $
Tue Nov 30 16:21:13 2004
Reel Header
Service name.......... ...LISTPE
Date. . . . . . . . . . . . . . . . . . . . .04/11/30
Origin. . . . . . . . . . . . . . . . . . . STS
Reel Name.............. ..UNKNOWN
Continuation Number. .... .01
Previous Reel Name...... . UNKNOWN
Comments................ .STS LIS Writing Library.
.
cJ°t.{-/go
tA 1>/
Scientific Technical Services
Tape Header
Service name............ .LISTPE
Date. . . . . . . . . . . . . . . . . . . . .04/11/30
Origin. . . . . . . . . . . . . . . . . . . STS
Tape Name.............. ..UNKNOWN
Continuation Number..... .01
Previous Tape Name...... . UNKNOWN
Comments............... ..STS LIS Writing Library. Scientific Technical Services
Physical EOF
Comment Record
TAPE HEADER
Colville River Unit (Alpine)
MWD/MAD LOGS
#
WELL NAME:
API NUMBER:
OPERATOR:
LOGGING COMPANY:
TAPE CREATION DATE:
#
JOB DATA
CD 1-11
501032050000
ConocoPhillips Alaska¡ Inc.
Sperry-Sun Drilling Services
30-NOV-04
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
MWD RUN 2
MW0003349027
R. KRELL
D. LUTRICK
MWD RUN 3
MW0003349027
R. KRELL
D. BURLEY
#
SURFACE LOCATION
SECTION:
TOWNSHIP:
RANGE:
FNL:
FSL:
FEL:
FWL:
ELEVATION (FT FROM MSL 0)
KELLY BUSHING:
DERRICK FLOOR:
GROUND LEVEL:
5
11N
5E
294
2502
55.98
19.50
#
WELL CASING RECORD
1ST STRING
2ND STRING
3RD STRING
PRODUCTION STRING
OPEN HOLE
BIT SIZE (IN)
8.500
6.125
12293.000
DRILLERS
DEPTH (FT)
3333.0
3333.0
CASING
SIZE (IN)
9.625
7.000
#
MWD RUN 4
MW0003349027
M. HANIK
D. LUTRICK
REMARKS:
.
.
1. ALL DEPTHS ARE BIT DEPTHS UNLESS OTHERWISE NOTED.
THESE DEPTHS ARE
MEASURED DEPTH (MD).
2. ALL VERTICAL DEPTHS ARE TRUE VERTICAL DEPTH (TVD).
3. MWD RUN 1 WAS DIRECTIONAL ONLY AND IS NOT PRESENTED.
4. MWD RUNS 2 - 4 COMPRISED DIRECTIONAL; DUAL GAMMA RAY
(DGR) UTILIZING
GEIGER-MUELLER TUBE DETECTORS; ELECTROMAGNETIC WAVE
RESISTIVITY
PHASE-4 (EWR4); AND PRESSURE WHILE DRILLING (PWD).
RUNS 2 & 3 ALSO
INCLUDED GEO-PILOT ROTARY STEERABLE BHA (GP). RUN 4
INCLUDED AT-BIT
INCLINATION (ABI).
5. MWD DATA ARE CONSIDERED PDC PER DISCUSSION OF ALPINE
LOGGING
REQUIREMENTS AT PHILLIPS/VENDOR MEETING HELD ON 26
SEPTEMBER 2001.
6. MWD RUNS 2 - 4 REPRESENT WELL CD1-11 WITH API#:
50-103-20500-00.
THIS WELL REACHED A TOTAL DEPTH (TD) OF
15057'MD/6984'TVD.
SROP SMOOTHED RATE OF PENETRATION WHILE DRILLING.
SGRC SMOOTHED GAMMA RAY COMBINED.
SEXP SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (EXTRA
SHALLOW SPACING) .
SESP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (SHALLOW
SPACING) .
SEMP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (MEDIUM
SPACING) .
SEDP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (DEEP
SPACING) .
SFXE = SMOOTHED FORMATION EXPOSURE TIME.
SLIDE = NON-ROTATED INTERVALS REFLECTING BIT DEPTHS.
$
File Header
Service name............ .STSLIB.001
Service Sub Level Name. . .
Version Number.......... .1.0.0
Date of Generation.... ...04/11/30
Maximum Physical Record. .65535
File Type....... ........ .LO
Previous File Name... ... .STSLIB.OOO
Comment Record
FILE HEADER
FILE NUMBER:
EDITED MERGED MWD
Depth shifted
DEPTH INCREMENT:
#
FILE SUMMARY
PBU TOOL CODE
FET
RPD
RPM
RPS
RPX
GR
1
and clipped curves; all bit runs merged.
.5000
START DEPTH
3301.0
3301.0
3301.0
3301.0
3301.0
3309.0
STOP DEPTH
15002.0
15002.0
15002.0
15002.0
15002.0
14995.0
ROP
$
3343.5.
15057.0
.
#
BASELINE CURVE FOR SHIFTS:
CURVE SHIFT DATA (MEASURED DEPTH)
--------- EQUIVALENT UNSHIFTED DEPTH ---------
BASELINE DEPTH
$
#
MERGED DATA SOURCE
PBU TOOL CODE
MWD
MWD
MWD
$
BIT RUN NO
2
3
4
MERGE TOP
3301.0
7397.0
12306.0
MERGE BASE
7397.0
12306.0
15057.0
#
REMARKS:
MERGED MAIN PASS.
$
#
Data Format Specification Record
Data Record Type..................O
Data Specification Block Type.....O
Logging Direction.......... ...... .Down
Optical log depth units.......... .Feet
Data Reference Point......... .....Undefined
Frame Spacing................... ..60 .1IN
Max frames per record............ . Undefined
Absent value...................... -999
Depth Units. . . . . . . . . . . . . . . . . . . . . . .
Datum Specification Block sub-type...O
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD FT/H 4 1 68 4 2
GR MWD API 4 1 68 8 3
RPX MWD OHMM 4 1 68 12 4
RPS MWD OHMM 4 1 68 16 5
RPM MWD OHMM 4 1 68 20 6
RPD MWD OHMM 4 1 68 24 7
FET MWD HOUR 4 1 68 28 8
First Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 3301 15057 9179 23513 3301 15057
ROP MWD FT/H 0.23 477.34 177.877 23428 3343.5 15057
GR MWD API 35.53 410.71 99.6818 23373 3309 14995
RPX MWD OHMM 0.18 2000 9.45046 23403 3301 15002
RPS MWD OHMM 0.13 1798.65 10.506 23403 3301 15002
RPM MWD OHMM 0.14 2000 13.1666 23403 3301 15002
RPD MWD OHMM 0.12 2000 17.0904 23403 3301 15002
FET MWD HOUR 0.12 77.82 1.10615 23403 3301 15002
First Reading For Entire File.... ......3301
Last Reading For Entire File.......... .15057
File Trailer
Service name............ .STSLIB.001
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation..... ..04/11/30
Maximum Physical Record. .65535
File Type........ ..... ...LO
Next File Name.......... .STSLIB.002
.
Physical EOF
File Header
Service name......... ... .STSLIB.002
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .04/11/30
Maximum Physical Record. .65535
File Type........... .... .LO
Previous File Name...... .STSLIB.001
Comment Record
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
RPD
RPM
RPS
RPX
FET
GR
ROP
$
2
.
header data for each bit run in separate files.
2
.5000
START DEPTH
3301.0
3301.0
3301.0
3301.0
3301.0
3309.0
3343.5
STOP DEPTH
7354.5
7354.5
7354.5
7354.5
7354.5
7267.0
7397.0
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME) :
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
TOOL STRING (TOP TO
VENDOR TOOL CODE
DGR
EWR4
$
BOTTOM)
TOOL TYPE
DUAL GAMMA RAY
ELECTROMAG. RESIS. 4
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
28-0CT-04
Insite
66.37
Memory
7397.0
3343.0
7397.0
48.6
63.1
TOOL NUMBER
124725
151812
8.500
3333.0
LSND
9.60
38.0
10.0
250
7.2
6.200
4.310
8.900
5.500
80.0
118.0
80.0
80.0
#
.
.
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
$
#
Data Format Specification Record
Data Record Type..................O
Data Specification Block Type. ....0
Logging Direction..... ..... .... ...Down
Optical log depth units.......... .Feet
Data Reference Point............. . Undefined
Frame Spacing.................... .60 .1IN
Max frames per record........... ..Undefined
Absent value........... ........ ...-999
Depth Uni ts . . . . . . . . . . . . . . . . . . . . . . .
Datum Specification Block sub-type...O
Name Service Order units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD020 FT/H 4 1 68 4 2
GR MWD020 API 4 1 68 8 3
RPX MWD020 OHMM 4 1 68 12 4
RPS MWD020 OHMM 4 1 68 16 5
RPM MWD020 OHMM 4 1 68 20 6
RPD MWD020 OHMM 4 1 68 24 7
FET MWD020 HOUR 4 1 68 28 8
First Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 3301 7397 5349 8193 3301 7397
ROP MWD020 FT/H 10.64 477.34 211.692 8108 3343.5 7397
GR MWD020 API 50.17 177.26 110.466 7917 3309 7267
RPX MWD020 OHMM 0.33 2000 6.44673 8108 3301 7354.5
RPS MWD020 OHMM 0.13 1798.65 5.99799 8108 3301 7354.5
RPM MWD020 OHMM 0.14 1809.23 8.75148 8108 3301 7354.5
RPD MWD020 OHMM 0.12 2000 17.7705 8108 3301 7354.5
FET MWD020 HOUR 0.12 62.3 1. 01161 8108 3301 7354.5
First Reading For Entire File...... .., .3301
Last Reading For Entire File.......... .7397
File Trailer
Service name......... .., .STSLIB.002
Service Sub Level Name...
Version Number.......... .1.0.0
Date of Generation...... .04/11/30
Maximum Physical Record. .65535
File Type............... .LO
Next File Name.......... .STSLIB.003
Physical EOF
File Header
Service name... ......... .STSLIB.003
Service Sub Level Name...
version Number. . . . . ... . . ...0
Date of Generation...... .04/11/30
Maximum Physical Record..65535
File Type................ LO
Previous File Name.. .....STSLIB.002
Comment Record
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
GR
FET
RPD
RPM
RPS
RPX
ROP
$
3
.
header data for each bit run in separate files.
3
.5000
START DEPTH
7267.5
7355.0
7355.0
7355.0
7355.0
7355.0
7397.5
STOP DEPTH
12271.0
12263.5
12263.5
12263.5
12263.5
12263.5
12306.0
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME) :
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
TOOL STRING (TOP TO
VENDOR TOOL CODE
DGR
EWR4
$
BOTTOM)
TOOL TYPE
DUAL GAMMA RAY
ELECTROMAG. RES IS. 4
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
31-0CT-04
Insite
66.37
Memory
12306.0
7397.0
12306.0
48.6
85.6
TOOL NUMBER
076571
121079
8.500
3333.0
LSND
9.60
37.0
9.0
300
7.6
1. 800
.920
1. 500
2.200
70.0
143.6
70.0
70.0
EWR FREQUENCY (HZ):
.
.
#
REMARKS:
$
#
Data Format Specification Record
Data Record Type.. ............ ....0
Data Specification Block Type.....O
Logging Direction.............. ...Down
Optical log depth units.... '" ... .Feet
Data Reference Point............. .Undefined
Frame Spacing................... ..60 .1IN
Max frames per record............ . Undefined
Absent value...................... -999
Depth Units. . . . . . . . . . . . . . . . . . . . . . .
Datum Specification Block sub-type...O
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD030 FT/H 4 1 68 4 2
GR MWD030 API 4 1 68 8 3
RPX MWD030 OHMM 4 1 68 12 4
RPS MWD030 OHMM 4 1 68 16 5
RPM MWD030 OHMM 4 1 68 20 6
RPD MWD030 OHMM 4 1 68 24 7
FET MWD030 HOUR 4 1 68 28 8
First Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 7267.5 12306 9786.75 10078 7267.5 12306
ROP MWD030 FT/H 3.94 449.65 189.514 9818 7397.5 12306
GR MWD030 API 35.73 410.71 111.065 10008 7267.5 12271
RPX MWD030 OHMM 1. 95 43.62 6.38449 9818 7355 12263.5
RPS MWD030 OHMM 2.01 47.22 6.57075 9818 7355 12263.5
RPM MWD030 OHMM 2.13 42.84 6.75635 9818 7355 12263.5
RPD MWD030 OHMM 2.2 39.99 6.72266 9818 7355 12263.5
FET MWD030 HOUR 0.16 22.87 0.596823 9818 7355 12263.5
First Reading For Entire File......... .7267.5
Last Reading For Entire File.......... .12306
File Trailer
Service name.. .......... .STSLIB.003
Service Sub Level Name...
Version Number....... ... .1.0.0
Date of Generation...... .04/11/30
Maximum Physical Record. .65535
File Type....... ........ .LO
Next File Name.. ........ .STSLIB.004
Physical EOF
File Header
Service name............ .STSLIB.004
Service Sub Level Name...
Version Number...... .... .1.0.0
Date of Generation..... ..04/11/30
Maximum Physical Record. .65535
File Type............... .LO
Previous File Name...... .STSLIB.003
Comment Record
FILE HEADER
FILE NUMBER:
RAW MWD
Curves and log
BIT RUN NUMBER:
DEPTH INCREMENT:
#
FILE SUMMARY
VENDOR TOOL CODE
RPD
RPM
RPS
RPX
FET
GR
ROP
$
.
4
.
header data for each bit run in separate files.
4
.5000
START DEPTH
12264.0
12264.0
12264.0
12264.0
12264.0
12271.5
12306.5
STOP DEPTH
15002.0
15002.0
15002.0
15002.0
15002.0
14995.0
15057.0
#
LOG HEADER DATA
DATE LOGGED:
SOFTWARE
SURFACE SOFTWARE VERSION:
DOWNHOLE SOFTWARE VERSION:
DATA TYPE (MEMORY OR REAL-TIME) :
TD DRILLER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
BIT ROTATING SPEED (RPM):
HOLE INCLINATION (DEG
MINIMUM ANGLE:
MAXIMUM ANGLE:
#
TOOL STRING (TOP TO
VENDOR TOOL CODE
DGR
EWR4
$
BOTTOM)
TOOL TYPE
DUAL GAMMA RAY
Electromag Resis. 4
#
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
#
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
MUD CHLORIDES (PPM):
FLUID LOSS (C3):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATING TERMPERATURE:
MUD FILTRATE AT MT:
MUD CAKE AT MT:
#
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
#
TOOL STANDOFF (IN):
EWR FREQUENCY (HZ):
#
REMARKS:
$
#
Data Format Specification Record
Data Record Type..................O
05-NOV-04
Insite
66.37
Memory
15057.0
12306.0
15057.0
84.4
92.8
TOOL NUMBER
156435
156404
6.125
12293.0
Flo Pro
9.20
41.0
8.5
31000
10.2
.180
.092
.160
.200
74.0
152.6
74.0
74.0
Data Specification Block ~e.....o
Logging Direction................ . Down
Optical log depth units.......... .Feet
Data Reference Point........... ...Undefined
Frame Spacing... ... ........ ...... .60 .1IN
Max frames per record.......... ...Undefined
Absent value.......... ........ ... .-999
Depth Units. . . . . . . . . . . . . . . . . . . . . . .
Datum Specification Block sub-type...O
.
Name Service Order Units Size Nsam Rep Code Offset Channel
DEPT FT 4 1 68 0 1
ROP MWD040 FT/H 4 1 68 4 2
GR MWD040 API 4 1 68 8 3
RPX MWD040 OHMM 4 1 68 12 4
RPS MWD040 OHMM 4 1 68 16 5
RPM MWD040 OHMM 4 1 68 20 6
RPD MWD040 OHMM 4 1 68 24 7
FET MWD040 HOUR 4 1 68 28 8
First Last
Name Service Unit Min Max Mean Nsam Reading Reading
DEPT FT 12264 15057 13660.5 5587 12264 15057
ROP MWD040 FT/H 0.23 297.34 107.28 5502 12306.5 15057
GR MWD040 API 35.53 120.14 63.0997 5448 12271.5 14995
RPX MWD040 OHMM 0.18 1637.48 19.3931 5477 12264 15002
RPS MWD040 OHMM 0.2 1390.45 24.2336 5477 12264 15002
RPM MWD040 OHMM 0.84 2000 31.1935 5477 12264 15002
RPD MWD040 OHMM 4.98 2000 34.6687 5477 12264 15002
FET MWD040 HOUR 0.34 77.82 2.15911 5477 12264 15002
First Reading For Entire File......... .12264
Last Reading For Entire File.......... .15057
File Trailer
Service name........... ..STSLIB.004
Service Sub Level Name...
Version Number....... ... .1.0.0
Date of Generation...... .04/11/30
Maximum Physical Record..65535
File Type.......... ......LO
Next File Name.......... .STSLIB.005
Physical EOF
Tape Trailer
Service name............ .LISTPE
Date. . . . . . . . . . . . . . . . . . . . .04/11/30
Origin. . . . . . . . . . . . . . . . . . . STS
Tape Name. . . . . . . . . . . . . . . .UNKNOWN
Continuation Number..... .01
Next Tape Name.......... .UNKNOWN
Comments.... .......... ...STS LIS Writing Library. Scientific Technical Services
Reel Trailer
Service name............ .LISTPE
Date. . . . . . . . . . . . . . . . . . . . .04/11/30
Origin. . . . . . . . . . . . . . . . . . . STS
Reel Name............... .UNKNOWN
Continuation Number..... .01
Next Reel Name...... .....UNKNOWN
Comments................ .STS LIS Writing Library. Scientific Technical Services
.
.
Physical EOF
Physical EOF
End Of LIS File