Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout198-124 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LoRECEIVED MAY 132004 1a. Well Status: 0 Oil 0 Gas a Plugged a Abandoned 0 Suspended 0 WAG 1~1..YVn~11 Class: 20AAC25.105 20AAC25.110 t.la~~i~Qons. Cllih~ory No. of Completions Zero Other 0 Strati~io~t 0 Service 5. Date Comp., Susp., or Aband. tL Iv. 12. Permit to Drill Number ,~ 1¡S-'Orp" 198-124 304-055 6. Date Spudded ç-17.b113. API Number 07/14/1998 50-029-22897-00-00 7. Date TD. Reached 14. Well Name and Number: 07/18/1998 MPJ-22 8. KB Elevation (ft): 15. Field 1 Pool(s): KBE = 68.08' Milne Point Unit 1 Schrader Bluff 9. Plug Back Depth (MD+TVD) Surface + Surface 10. Total Depth (MD+TVD) 5760 + 4299 11. Depth where SSSV set N/A MD 19. Water depth, if offshore N/A MSL .. - - " 0 GINJ 0 WINJ 0 WDSPL 2. Operator Name: BP Exploration (Alaska) Inc. 3. Address: P.O. Box 196612, Anchorage, Alaska 99519-6612 4a. Location of Well (Governmental Section): Surface: 2151' NSL, 3265' WEL, SEC. 28, T13N, R10E, UM Top of Productive Horizon: N/A Total Depth: 2769' NSL, 1055' WEl, SEC. 29, T13N, R10E, UM 4b. Location of Well (State Base Plane Coordinates): Surface: x- 552057 y- - 6014550 Zone- ASP4 TPI: x- N/A y- N/A Zone- N/A Total Depth: x- 548981 y- 6015146 Zone- ASP4 18. Directional Survey 0 Yes a No 21. Logs Run: MWD , GR , RES, CALIPHER , GRlJB 22. Ft Ft 16. Property Designation: ADL 025517 17. Land Use Permit: 20. Thickness of Permafrost 1800' (Approx.) . CASING ,SIZE 13-3/8" 5-112" . ' , , , WT. P-eR;FT: GRADE' 72# L-80 15.5# J-55 CASING, LINER AND CEMENTING RECORD SETJJN(åJ:;l~MD { Se:rrI i G~lf'r',¡tl' 'R~~: . lOP. ,'-aÖTIÓM'toP BOTtOM"'; Stæ' , ",'CEMMIN<i RECORD " ' , . . '. ' 35' 120' 35' 120' 16" 250 sx Arcticset I (Approx.) 33' 5738' 33' 4285' 6-3/4" 400 sx Coldset III, 90 sx Foamed 'G', 90 sx 'G' 300' To Surface PRODUCTION TEST Method of Operation (Flowing, Gas Lift, etc.): N/A Oll-BBl 23. Perforations open to Production (MD + TVD of Top and Bottom Interval, Size and Number; if none, state "none"): None MD TVD MD 26. Date First Production: Not on Production Date of Test Hours Tested PRODUCTION FOR TEST PERIOD ... Flow Tubing Casing Pressure CALCULATED ....... Press. 24-HoUR RATE""" Oll-BBl Mo!,Mr' " .PtJiJ.èDrt 24. " ,. TUBING RECORD DEPTH SET (MD) PACKER SET (MD) SIZE None TVD 25.\" ,ACID, FRACTURE, CEM.Et-1T SQU¡;EZE, !;TC.' , DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED 4600' Set Cement Retainer squeezed 35 Bbls ' G' below, Lay in 5 Bbls 'G' on top of Retainer Set Bridge Plug Surface plug of 8 1/2 Bbls Arcticset GAs-McF CHOKE SIZE I GAS-Oil RATIO Oil GRAVITY-API (CORR) WATER-BBl GAs-McF WATER-BBl CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water (attach separate sheet, if necessary). Submit core chips; if none, state "npQ~"',;,7:':::~';-:--~A&-J~f 1\IMd:r', JON 0 9 2004 j v.)~¡~;~ '\J'~J x* ~<l-~~~'..:IQ'~ ß\n/I \A S"'A"~'\ßø'-' . I r' jÇ': Ó 71 \oS'-~ '1.(J" J' \:;/ -0' \ .., î \1<:."-;::[' ¡ * C>-~ ~ p:):... ;)"\. ~::_J OR' GI NAI RBOMSBfL 27. Form 10-407 Revised 12/2003 MØ'I"? - G¡; CONTINUED ON REVERSE SIDE ~ , .. 28. GEOLOGIC MARKERS 29. FORMATION TESTS NAME MD TVD Include and briefly summarize test results. List intervals tested, and attach detailed supporting data as necessary. If no tests were conducted, state "None". Schrader Bluff 'D3' 5282' 4002' None Schrader Bluff 'C' 5334' 5391' 4033' 4068' Schrader Bluff 'B' RECEIVED MAY I 3 2004 Alaska Oil & Gas Cons. Commission Anchorage 30. list of Attachments: Summary of Daily Drilling Reports, Well Schematic Diagram and a Post Rig Summary. 31. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed ..I~4 -"~ .- T'tl T h. I A . t t Sondr~ewman '({I:XlS.l¿t:J:JJ:jJ'f;o ----- I e ec mca S51S an "- MPJ-22 198-124 304-055 Prepared By Name/Number: Well Number Permit No. / Approval No. Drilling Engineer: INSTRUCTIONS Date (jC) -/7... - 01 Sandra Stewman, 564-4750 David Reem, 564-5743 GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. ITEM 1a: Classification of Service Wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. ITEM 4b: TPI (Top of Producing Interval). The Kelly Bushing elevation in feet above mean low low water. Use same as reference for depth measurements given in other spaces on this form and in any attachments. ITEM 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00). ITEM 8: ITEM 20: True vertical thickness. ITEM 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. ITEM 23: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). ITEM 26: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, or Other (explain). ITEM 27: If no cores taken, indicate "None". SCANNED JUN 0 9 2004 ITEM 29: List all test information. If none, state "None". Form 10-407 Revised 12/2003 . , Tree: 21/16" - ADS Gray Wellhead: 7 1/16" Gray Descoping Sys Tbq. HnQ: 2 3/8" x 7 1/16" Gray wI 2 3/8" EU 8rd T&B and 2" CIW H BPV profile MPU J-22 13 3/8" 72 ppf, L-80 I 115' ,. Orig. DF Elev. = 68.08' (N 27E) Orig. GL Elev. = 34.90' DF to 7" csg. hng. = ' (N 27E) ~: .,~ 7" 26#", L.BO ,,' \ ' 158 ppg7::::::rta~ 118 Bridge plug set @ 300' KOP @ 500' Max. hole angle = 60 @ 4850' Hole angle thru' perfs = 50 deg 0 5.5" Port Collar Cementer I 1815' md 9,8# Bnne Two 5.5" x 20' short jts. fI 4890' to 4930' me Stimulation Summary OBIOA 7131/98 - 91,397# of 16/30 Badger sand was placed behind pipe Size SPF (TVD) 5 Bbls of cement above plug. GMT Retainer @ 4600' 35 Bbls of cement below plug Perforation Summary Ref loa: MLGRlCCL run 7/24/98 HES X-Nipple (2.313') WLEG 15,031' I 15,047' 1 15,098'1 15,165' I 5,160' 5,176' 5,184' Interval HES 14#-17# Versatrieve pkr. 3.5" Micron poroplus screen Pup 31.87" 3.5" Micron poroplus screen 31,87" Straight slot locator & seals Collet Muleshoe guide HES 5.5"BWD Packer i :z m 0 Co- c: :z: 0 ø f') C) 0 ,J::", 3-3/8" 6 3-3/8" 6 3-3/8" 6 3-3/8" 1/2 3-3/8" 0.64 3-3/8" 2 N 5050'-5076' 3918'-3922' N 5102'-5110' 3894'-3902' N 5140',5148' 3868'-3883' OA 5294',5300' 4008',4012' OA 5316',5330' 4022',4030' OB 5402'-5422' 4073'-4087' Fish: 90 ea. 7/8 "dia. 1.3 s.g. ball sealers 5.5" landing collar (PBTD) 5,653' md 5.5' float collar 5,655' md 5.5" float shoe 5,738' md DATE REV. BY COMMENTS MILNE POINT UNIT 07/26/98 MDO Drilled and Cased by Nabors 27E WELL J-22 08/01/98 KJW OB/QA Sands parfed and fractured API NO: 50-029-22897 08/21/98 MDO PC Completion & Screens 5s 04/02/04 MOO P&A 4-es BP EXPLORATION (AK) . , Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: MPJ-22 MPJ-22 PLUG+ABANDON NABORS ALASKA DRILLING I NABORS 4ES Start: 3/29/2004 Rig Release: 4/2/2004 Rig Number: Spud Date: End: 3/31/2004 06:00 - 11 :00 5.00 MOB P PRE RDMO of MPE-25 & move to MPJ-22. 11 :00 - 15:00 4.00 RIGU P PRE Spot in rig sub, pipe shed & pits. Spot in rig camp. Rig up rig. Raise & scope derrick. 15:00 - 18:00 3.00 RIGU P DECOMP R/U hard lines to tree. Move & spot in tiger tank. Connect hard lines to tiger tank. Take on seawater. Pull BPV. Test kill lines. Rig accepted @ 15:00 hrs. 18:00 - 18:30 0.50 KILL P DECOMP Hold PJSM & Pre-spud meeting wI all hands. 18:30 - 19:30 1.00 KILL P DECOMP Open well. SITP 150 psi, Ann 120 psi. Circulate & kill well wI seawater. 3 1/2 BPM @ 850 psi. Bullheaded 20 bbls as follows: 3 BPM @ 1400 psi. 2 BPM @ 1050 psi. 1 BPM @ 620 pSI. 19:30 - 20:30 1.00 KILL P DECOMP Con't to circulate well thru pits & clean up. Pumping 3 BPM @ 900 psi. SO & monitor well, well dead & on vacuum. 20:30 - 21 :00 0.50 WHSUR P DECOMP Set TWC & test. Blow down & RID lines from tree. 21 :00 - 22:00 1.00 WHSUR P DECOMP Bleed off void & NID X-mas tree. 22:00 - 00:00 2.00 BOPSUF P DECOMP N/U BOPE & install 2 3/8" pipe rams. 4/1/2004 00:00 - 01 :30 1.50 BOPSUF P DECOMP R/U test equip. Perform body& ram test. UP 250 psi, HIP 3500 psi. RID test equip. BOP testing waived by John Crisp wI AOGCC. 01 :30 - 03:00 1.50 WHSUB P DECOMP M/U lubricator. Pull TWC. UD lubricator. 03:00 - 03:30 0.50 WHSUB P DECOMP M/U landing jt & screw into hanger. BOLDS. 03:30 - 04:30 1.00 PULL P DECOMP Pull hanger to floor wI 38K. UD hanger. 04:30 - 05:30 1.00 PULL P DECOMP Pull ESP cable over sheave & RlU equip to pull 2 3/8" completion. 05:30 - 10:30 5.00 PULL P DECOMP POOH wI 2 3/8" completion. Stand back tbg to use as work string. 10:30 - 12:30 2.00 PULL P DECOMP PJSM. UD ESP equipment. Recovered all steel bands & flat guards. 12:30 - 14:30 2.00 CLEAN P ABAN Clearlclean rig floor. Rig up to run 2 3/8" tbg. P/U & M/U bit, scraper & junk sub. 14:30 - 17:30 3.00 CLEAN P ABAN PJSM. RIH w/2 3/8" tbg to 4670'. 17:30 - 18:00 0.50 CLEAN P ABAN Circulate bottoms up. Had slight amount of oil & gas when bottoms up. Circulate clean & monitor well. 18:00 - 19:30 1.50 CLEAN P ABAN POOH wI BHA #1. 19:30 - 20:00 0.50 CLEAN P ABAN UD BHA #1. clear & clean rig floor. 20:00 - 21 :00 1.00 CEMT P ABAN Hold PJSM. M/U cement retainer & setting tool. UD 2 singles. 21 :00 - 23:30 2.50 CEMT P ABAN RIH wI cement retainer on 2 3/8" tubing to 4600'. 23:30 - 00:00 0.50 CEMT P ABAN M/U circulating head. Break circulation & fill hole wI 14 bbls. Space out & set cement retainer @ 4600'. Shear out wI 38K over. P/U 25K, SIO 24K. Perform 20 Bbl injectivity test as follows: 1 BPM @ 200 psi, 2 BPM @ 775 psi, 3 BPM @ 1525 psi. Unsting from cement retainer. 4/212004 00:00 - 00:30 0.50 CEMT P ABAN Circulate. Hold PJSM & RlU cementers. 00:30 - 01 :30 1.00 CEMT P ABAN Squeeze well as follows thru cement retainer @ 4600'. Pump 5 Bbls of fresh water. Pressure test lines to 3800 psi. Mix & pump 40 BBls of Class "G" cement 15.8 ppg, yld 1.16 cuftlsx. Displce wI 12.8 Bbls of fresh water. Pull & UD 6 singles tbg, leaving last 5 Bbls of cement above cement retainer. APR 2.5 BPM. Pressure increased from 1200 to 1900 psi. CIP @ 0130 hrs. 01 :30 - 02:30 1.00 CEMT P ABAN Reverse out excess cement had approx 1/2 Bbls of cement to surface after reversing out. Con't to reverse out until well completely clean. S{;ANNEÛ JUt\ 0 9 2004 Pnnted 4/5/2004 94646 AM < ... . #' legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: MPJ-22 MPJ-22 PlUG+ABANDON NABORS ALASKA DRILLING I NABORS 4ES Start: 3/29/2004 Rig Release: 4/2/2004 Rig Number: Spud Date: End: 41212004 02:30 - 03:30 1.00 CEMT P ABAN R/U & pressure test squeeze job. pressured up to 1500 psi & test for 30 min. Good test, charted same. Testing witnessed by John crisp wI AOGCC. 03:30 - 05:00 1.50 CEMT P ABAN Displace well bore wI 9.8 ppg brine water. Pumped 120 Bbls, 3.5 BPM @ 1000 psi. 05:00 - 09:00 4.00 CEMT P ABAN Break out circulating head & lines. Blow down same. POOH & UD 2 3/8" tubing. 09:00 - 09:30 0.50 CEMT P ABAN PJSM. Make up Halliburton 5 1/2" EZSV Bridge plug & RIH to 300' (+ -i. Rotate to the right 35 turns & pick up 10K. Close annular preventor & pull to 37K, see setting tool shear. 09:30 - 10:00 0.50 CEMT P ABAN POOH & UD setting tool. 10:00 - 10:30 0.50 CEMT P ABAN RIH w/2 3/8" tbg to bridge plug & pick up 2'. 10:30 - 11 :00 0.50 CEMT P ABAN Safety meeting with all personel regarding cement job. 11 :00 - 11 :30 0.50 CEMT P ABAN Pump 5 bbls fresh water, test lines @ 1700 psi, OK. Pump 8.5 bbls 15.8 ppg ARCTICSET class G cement. Flush lines. 11:30-12:30 1.00 CEMT P ABAN PJSM. POOH wI 2 3/8" tubing & UD same. 12:30 - 17:30 5.00 PXA P ABAN PJSM. Change out pipe rams to 2 7/8" x 5" VBRs. Clean cement out of stack & test ports. N/D BOPE. 17:30 - 18:00 0.50 PXA P ABAN N/U flange & Dry hole tree. Test to 1000 psi, OK. RELEASE RIG @ 1800 hrs. 18:00 - 00:00 6.00 MOB P ABAN RID Move off. SCANNED JUN 0 9 2004 Pnnted. 4/5/2004 9:46 46 AM ~ < - . Well: Field: API: Permit: MPJ-22 Milne Point Unit / Schrader Bluff 50-029-22897-00-00 198-124 POST-RIG WORK 04/12/04 HELP ATP WITH PEAK AND BP SAFETY PRIOR TO STARTING SURFACE ABANDONMENT. BEGAN TRENCHING AROUND THE J-22 CELLAR BOX IN PREPARATION FOR EXCAVATING G RAVEL. 04/15/04 CUT 13-3/8" SURFACE CASING AND 7" PRODUCTION CASING AT 3' BELOW TUNDRA LEVEL. WELDED CAP ON TOP OF STUBS CONTAINING THE FOLLOWING BEAD WELD, "BP EXPLORATION (ALASKA) INC. PTD #198-124, WELL MPJ-22, API#50-029-22897". CHUCK SCHEVE OF THE AOGCC WITNESSED P&A. SCANNED JUN Q 9 2004 ~. ~, ~~ ~. ~ ¡~ MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission TO: Jim Regg,. K¿t11 4 (-¿:/()Ir P. I. Supervisor ( DATE: April 15, 2004 FROM: Chuck Scheve, Petroleum Inspector SUBJECT: Surface Abandonment MPU J-22 PTD#198-124 Thursday. April 15.2004: I traveled to BPX's MPU J Pad to inspect the casing cut off depth and abandonment of well J-22. All casing strings were cut off at approximately 4' below original ground level and all were found to be full of cement. A %" thick marker plate was welded to the conductor casing with the required information bead welded to it. SUMMARY: I inspected the casing cut off depth, and the P&A marker plate on BPX's MPU well J-22 and found all to be in order. Attachments: MPU J-22 plate.JPG MPU J-22 cut off.JPG , ~ -- Milne Point J-22 (BPXA) Suñace Abandonment Inspection Photos from AOGCC Inspector Chuck Scheve April 15, 2004 Casing cut-off 4 ft BGL Marker plate .... TO: State of Alaska Alaska Oil and Gas Conservation Commission Jim Regg, ~~q 4\9104 DATE: April 2,2004 P. I. Supervisor MEMORANDUM FROM: John Crisp, Petroleum Inspector SUBJECT: BPX MPU J-22 Cement retainer Pressure test Surface Plug Cement Job PTD 198-124 April 2. 2004: I traveled to Milne Point Units J-22 to witness the Perforation to cased hole segregation plug pressure test & to witness the surface plug cement job. I witnessed a pressure test of the cement plug & mechanical retainer set @ 4400' MD. Casing was tested to surface along wI segregation plug. Initial pressure applied to plug & casing was 1690 psi. Pressure stabilized to 1610 psi. after 15 minutes & stabilized to final pressure of 1600 psi. after 30 minutes. I witnessed Haliburton EZSV run to 300' RKB. I witnessed Arctic set 1 15.8 ppg. cement spotted from 300' to the wellhead. Summary: I witnessed Plug & Abandon work performed on BP's MPU J-22. Attachment: Copy of pressure test chart recording. NON-CONFIDENTIAL Plug & Abandonment MPU J-22 04-02-04 JC.doc , ... 451.1. }..Afvl .:f - z.- 7..-- frt) l q tb -l 'L-4- À ÒJ ~ 'WSP . It' ALASKA 01 L AND ~~;~g~S~L:::;;ON COMMISS 1 otf< E C F !'\ ,/ r~ ¡", . ~) (:> C; ~. \~ ,-" .-,,', <ï<J' . APPLICATION FOR SUNDRY APPROV~~B 24 2004 Y' JZ 20 AAC 25.280 ' f\I...!. ')." :, :"", ~~.f"' r' ;',/ ",." ('rv'-,"" """", '\ ~ "è" ~ 4 ", ,', '.,.. '" 1. Type of Request: ~ì ";" :', q r ~',,;"\ ;:,' !HI Abandon 0 Suspend 0 Operation Shutdown 0 Perforate 0 Waiver ' . 0 Oth"8r ' 0 Alter Casing 0 Repair Well !HI Plug Perforations 0 Stimulate 0 Time Extension 0 Change Approved Program 0 Pull Tubing 0 Perforate New Pool 0 Re-Enter Suspended Well 0 Annular Disposal 2. Operator Name: 4. Current Well Class: 5. Permit To D~ Number BP Exploration (Alaska) Inc. 181 Development 0 Exploratory 198-124" 3. Address: 0 Stratigraphic Test 0 Service 6. API Number: / P.O. Box 196612, Anchorage. Alaska 99519-6612 'v 50- 029-22897-00-00 ' 7. KB Elevation (ft): KBE = 68.08' 9. Well Name and Number: MPJ.22 8. Property Designation: 10. Field I Pool(s): ADL 025517 Milne Point Unit I Schrader Bluff 11. .,. ,,' ...' , P~ESENTWELLCdNDITION SUMMARY".. ,. ".", ""'" .' ,..' .', ". '. ". '.'. ., ," '.;,' Total Depth MD ~ Total Depth TV~): Effective Depth MD (ft): Effective Depth TVD (ft): Plugs (measured): Junk (measured): 5760 '. 4299 5653 4231 NIA N/A Casin~ .". ""'.""'. ,"'. ..,,'." , .',"." Length.~ ',',' ,..,.'.,.'..,,".'. "..".'Size"'....,,.',...... 1'..,..,' "'."'.,',.MO' , .'.." ',' '. "WD ',.,' .". "".".'" ,Burst ." ',', 'Collapse ""...' ...' :,'"", " Structural . 85' 13-3/8" 120' 120' 4930 2670 Lul Surface . . . prnnllf"tion 5705' 7" x 5-1/2" 5738' 4285' 7000 4990 Liner Perforation Depth MD (ft): Perforation Depth.TVD (ft): Tubing Size: Tubing Grade: Tubing MD (ft): 5050' - 5422' 3868' - 4087' 2-3/8",4.7# J-55 4941' Packers and SSSV Type: (Gravel Screen Assembly) 5-1/2" Versatrieve Packer and a Packers and SSSV MD (ft): 5031',5160' 5-1/2" 'BWD' Packer 12. Attachments: 13. Well Class after proposed work: 181 Description Summary of Proposal 0 BOP Sketch 0 Exploratory 181 Development 0 Service 0 Detailed Operations Program 14. Estimated Date for 15. Well Status after proposed work: Commencing Operations: March 04, 2004 0 Oil 0 Gas 181 Plugged 181 Abandoned 16. Verbal Approval: Date: 0 WAG DGINJ DWINJ 0 WDSPL Commission Representative: 17. I hereby certi~y1(1at the foregoing is true and correct to the best of my knowledge. Contact David Reem. 564-5743 Printed Namr q>avid. Re~m -, í) Title Drilling Engineer Prepared By Name/Number: Signature ~ ~.. ( ~ Iv (/"",,- Phone 564-5743 Date 2/1ti}O Lj Sondra Stewman, 564-4750 "'.""~~>'.-,~...:.....'.;..',;..".,..i"'."',:,'\/,' ""':""";.'" '..,Comrnisáiohl.Jse,~()l1ly" ',',., :."i~'.;~ .."..""..,.,.",""....,..."":";;/~,ii,',..',.''."","';'."...."',...,..'.'".,..,'" ~ "'" ,'. I:..., .',.'/ .": .."...,','., ";..,' .'. '" '.'.. ...",':' """ ",: '.! I Sundry Number: 304.. CJ-,:j!:J - ~:tions of appro*,ify Commission so that a representative may witness Plug Integrity BOP Test 0 Mechanical Integrity Test 0 Location Clearance 'Other: X... ~~~~~ " Í\..<) Ç>~C -\- ",:A-öCL" ~ G\ ~ ~'Q. \x \" ~.\c..\ \..a.\-\'ô". Subsequent for ~;;;1 b~ 77 ~~ ~CA\~i\iE[) MA~ 1 @ 2004 BY ORDER OF Date ~ 1J15Í #,£ Approved' J ~ J COMMISSIONER THE COMMISSION Form 10-403 d1~~ '- pubmit (, Duplicate ~.1' L, FfS ~u lD~,~ ORIGINAL Programs for MPE-20 and MPl-22 revised ....""-"'-.. ..,.",..,.- Subject: Programs for MPE-20 an MPl-22 From: "Reem, David C" <ReemDC Date: Wed, 25 Feb 2004 09:23:42 -0900 To: tom- maunder@admin.state.ak.us «AOGCC ProcedureE-20.doc» «AOGCC Procedure. doc» Tom, as requested per our phone conversations, here are the revised l-page programs for the proposed Milne pt abandonments for E-20 (pre-sidetrack) and J-22 (complete abandonment). Let me know if further details are needed. Thanks! Dave Reem Sr. Workover Engineer 564-5743 C t t D . f AOGCC on en - escrlp Ion: ProcedureE-20.doc ProcedureE-20.doc Content-Type: application/msword Content-Encoding: base64 Content-Description: AOGCC Procedure.doc Procedure.doc Content-Type: application/msword Content-Encoding: base64 1 of 1 2/25/2004 9:32 AM .- \v -- ~ \ ,,\ I)' d-'. AOGCC Permittine Requirement 1. 10-403 must be submitted and approved prior to abandonment 4ES Scope - Abandonment procedure per AOGCC Reeulations 1. MIRU Nabors 4ES 2. Kill Well a. 1/14/2004 FL shot found -1745 psi @ 4000' TVDss (0.4363 psi/ft, -8.4 ppg) - r \,,'~~\\.~ ,~~.\- ~~~ 3. Pull existing ESPCP completion (KUDU 100TP1800 ESPCP, Centrilift PHD, 3500' ofCentrilift heat trace) 4. Set 5.5" cement retainer @ -4950' MD a. Retainer must be set 50' to 500' above the top perforated interval (5050' MD) 5. Pump cement through retainer to isolate perforated intervals a. Volume pumped needs to fill at least 100' below lowest perforated interval (5422' MD) 6. Record the location and integrity of plug/retainer by either: 7. Placing sufficient weight on plug to confirm location and competency 8. ii. Testing of plug to hold a surface pressure of 1500 psig -or- (0.25 psi/ft)(TVD casing shoe) whichever is greater i. (0.25)(4231' TVDkb) = 1058 psi Use 1500 psi surface pressure if this option used ii. Note: Surface pressure cannot subject casing to a hoop stress of greater than 70% of the casing's minimum yield (burst). iii. For new 5.5" 15.5# L-80 min yield (burst) is 7000 psi, 70% = 4900 psi 9. Cap cement retainer with at least a 50' cement plug (-4900' MD) 10. PUR and fill wellbore with a fluid of sufficient density to exert a hydrostatic pressure greater than the highest formation pressure (plan on 8.5 ppg brine) a. 1/14/2004 FL shot found -1745 psi @ 4000' TVDss (0.4363 psi/ft, ----8.4 ppg) 11. Set 5.5" CIBP at ----300' MD 12. PUR and fill 5.5" x 7.0" casing with cement to original ground elevation (31' MSL ). 13. RDMO 4ES 14. Cut all casing strings 3' below tundra grade and weld on marker plate. AOGCC Field Inspector must be notified to witness the marker plate before covering with gravel. . Þ-üC ~ \ <"-""'y<:.C\O \ +0 \1'S~Q.c..:~ c.v\- ~ ?DQ, \-t::> ~Q \~\ "'- ~ (:)~, "'''°, \'-4-\ ? \c:~:~ ~ . /Vt P l,":' 2. 2. 4ES Sco e - Abandonment 1. MIRU Nabors 4ES 2. Kill Well a. 1/14/2004 FL shot found ~ 1745 psi @ 4000' ppg) 3. Pull existing ESPCP completion (KUDU lOOT 800 ESPCP, Centrilift PHD, 3500' of Centrilift heat trace) ~~ . Ù 4. Set 5.5" cement retainer @ ~~ ../'J a. Retainer must be set 50' to 5 ,. ' a ove the top perforated interval (5050' MD) 5. Pump cement through retai~r À~ ate perforated intervals a. V olume pumped ne~to~f at least 100' below lowest perforated interval (5422' ) 6. Record the location -in, g 'ty of plug/retainer by either: 7. Placing sufficient weigh plug to confirm location and competency 8. ii. Testing of plu to surface pressure of 1500 psig -or- (0.25 psi/ft)(TVD casing shoe) whiche . '. greater i. (0.2~ 31' TVDkb) = 1058 psi Use 1500 psi surface pressure if t i ption used ii. . Surface pressure cannot subject casing to a hoop stress of r ter than 70% of the casing's minimum yield (burst). r new 5.5" 15.5# L-80 min yield (burst) is 7000 psi, 70% = LJ.900 psi ~<;.() 0 9. Cap cemen retainer with at least a 50' cement plug (~4000' MD) 10. PUH and llwellbore with a fluid of sufficient density to exert a hydrostatic pressure greater than the highest formation pressure a. /14/2004 FL shot found ~ 1745 psi @ 4000' TVDss (0.4363 psi/ft, ~8.4 ppg) 11. Set .5" CIBP at ~300' MD 12. P and fill 5.5" to 7.0" casing with cement to original ground elevation (31' L). 13. DMO 4ES AOGCC Permittine: ReQuirement 1. 10-403 must be submitted and approved prior to abandonment . . Tree: 2 1/16" - RDS Gray Wellhead: 7 1/16" Gray Descoping Sys Tba. Hna: 23/8" x 7 1/16"Gray w/2 3/8" EU 8rd T&B and 2" CIW H BPV profile 133/8" 72 ppf, L-80 I 115' KOP @ 500' Max. hole angle = 60 @ 4850' Hole angle thru' perfs = 50 deg 23/8" 4.70" ppf, J-55, 8 rd EUE tbg.. ( drift 10 =1.995 ", cap. = 0.00387 bpf ) 5.5" 15.5 ppf, J-55, Btrc. prod. casing ( drift ID = 4.950", cap. = 0.0238 bpf ) Pump Intake @ 3786' TVD Two 5.5" X 20' short jts. fl 4890' to 4930' m Stimulation Summary OBJOA 7/31/98 - 91,397/1 ot 16/30 Badger sand was placed behind pipe Perforation Summary Ref loa: MLGR/CCL run 7/24/98 Size SPF Interval (TVD) 3-3/8" 6 N 5050'-5076' 3918'-3922' 3-3/8" 6 N 5102'-5110' 3894'-3902' 3-3/8" 6 N 5140'-5148' 3868'-3883' 3-3/8" 1/2 þA 5294'-5300' 4008'.4012' 3-3/8" 0.64 OA 5316'-5330' 4022'-4030' 3-3/8" 2 OB 5402'-5422' 4073'-4087' Fish: 90 ea. 7/8 "dia. 1.3 s.g. ball sealers MPU J-22 Orig. OF Elev. = 68.08' (N 27E) Orig. GL Elev. = 34.90' OF to 7" csg. hng. = I (N 27E) T' 26#/ft L-80 7"x 5.5" X-Over Camco 2 3/8" X 1" sidepocket KBMM GLM I 118' I I 140' 5.5" Port Collar Cementer I 1815' md I 3,500' I Centrilift heat trace Camco 2 3/8" x 1" sidepocket KBMM GLM 2-3/8" HES X-Nipple ( 1.875" id ) KUOU 100TP1800 PCP, Centrilift flex shaft Centrilift seal section fst3db i Ihspfsaflas uthsr Centrilift FMH series, 54 hp motor, 1020 v. I 35 amps. [9:01 Gear Box] Centrilift PHO HES 14#-17# Versatrieve pkr. 3,5" Micron poroplus screen Pup 31.87" 3.5" Micron poroplus screen 31.87" Straight slot locator & seals Collet Muleshoe guide HES 5.5" BWD Packer HES X-Nipple (2.313'1 WLEG 14,821' I 14,868' I I 4,880' I I 4,916' I 14,928' I I 4,941' I 15,031' I I 5,047' I 15,098' 1 15.165' I 5,160' 5,176' 5,184' 5.5" landing collar (PBTD) 5,653' md 5.5" float collar 5,655' md 5.5" float shoe 5,738' md 07/26/98 08101 198 08/21/98 MOO KJW MDO COMMENTS Drilled and Cased by Nabors 27E OB/OA Sands perfed and fractured PC Completion & Screens 5s MILNE POINT UNIT WELL J-22 API NO: 50-029-22897 DATE REV. BY BP EXPLORATION AK , '«" MPJ-22Proposed Orig. OF Elev. = 68.08' (N 27E) Orig. GL Elev. = 34.90' DF to 7" csg. hng. = ' (N 27E) KOP @ 500' Max. hole angle = 60 @ 4850' Hole angle thru' perfs = 50 deg 5.5" 15.5 ppf, J-55, Btrc. prod. casing ( drift 10 = 4.950", cap. = 0.0238 bpf ) Two 5.5" x 20' short jts. fI 4890' to 4930' m Stimulation Summary OBlOA 7/31/98 - 91,397# of 16/30 Badger sand was placed behind pipe Perforation Summary Ref loa: MLGR/CCL run 7/24/98 Size SPF Interval (TV D) 3-318" 6 3-3/8" 6 3-3/8" 6 3-3/8" 1/2 3-3/8" 0.64 3-3/8" 2 N 5050'-5076' 3918'-3922' N 5102'-5110' 3894'-3902' N 5140'-5148' 3868'-3883' A 5294'-5300' 4008'-4012' OA 5316'-5330' 4022'-4030' OB 5402'-5422' 4073'-4087' Fish: 90 ea. 7/8 "dia. 1.3 s.g. ball sealers DATE REV. BY xxxxxx XXXXXX XXXXXX XXXXXX xxx XX XXXXX XXXXX xxx XX xxx XX Surface cement plug placed from 175' to within 5' of the original GL 7" 26#/ft L-80 13 3/8" 72 ppf, L-80 7" x 5.5" X-Over 5.5" CISP I 115' I I 118' I I -175' I 5.5" Port Collar Cementer 11815' md Top of Cement Cap 5.5" EZSV Cement Retainer HES 14#-17# Versatrieve pkr. 3.5" Micron poroplus screen Pup 31.87" 3.5" Micron poroplus screen 31.87" Straight slot locator & seals Collet Muleshoe guide HES 5.5" BWD Packer HES X-Nipple ( 2.313') WLEG I -4000'1 1-4050'1 15,031'1 I 5,047' I 15,098' I 15,165' I 5,160' 5.176' 5,184' 5.5" landing collar (PBTO) 5,653' md 5.5" float collar 5,655' md 5.5" float shoe 5,738' md 07/26/98 08101/98 08/21/98 MOO KJW MOO COMMENTS Drilled and Cased by Nabors 27E OB/OA Sands perfed and fractured PC Completion & Screens 5s MILNE POINT UNIT WELL J-22 API NO: 50-029-22897 BP EXPLORATION AK =Weli Complianbe RePort File on Left side of folder 198-124-0 MD 05760 ~- Microfilm Roll MILNE POINT UNIT SB J-22 TVD 04299 "~' Completion Date:/--~2/98 / - Roll 2 / 50- 029-22897-00 BP EXPLORATION (ALASK A \ IKI~ Completed Status: 1-OIL Current: Name D 8732 L 4 ARM CALIPER L BP SETTING L DGR/EWR4-MD L DGR/EWR4-TVD L PERF L PERF R SRVY RPT Daily Well Ops Was the well cored? yes no Interval b-4/~ SPERRY MPT/GR/EWR4 OH '-FinAL 14%5510 · ~ 4718-4780 ~l,~l~ ~ 2941-5560 ~tl~/~ OH ~ 2700-4299 ~ OH FINAL 4850-5605 / 7~a~ ~ff CH 5 FINAL 0-5550 gO0v~¢X 7Z.~, CH 5 0-.60. Are Dry Ditch Samples Required? yes Analysis Description Received? yes no Sent Received T/C/D 11/18/98 11/18/98 8/13/98 8/20/98 9/25/98 10/22/98 11/18/98 11/18/98 11/18/98 11/18/98 9/25/98 10/22/98 9/25/98 10/22/98 1/12/99 1/13/99 no And Received? yes no Sample Set # Comments: Tuesday. August 01, 2000 Page 1 of 1 MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission TO: THRU: >-.._?~ .:~:~ Julie Heusser, :'-~,x¥? ~? Commissioner - ,.\,~ Tom Maunder, ~. ~F~_~'~., P. !. Supervisor ~/~.~--',~L\ FROM: Chuck Scheve; SUBJECT: Petroleum Inspector DATE' April 22, 2001 Safety valve Tests Milne Point Unit J'&:l Pads Sunday A~3ril 22, 2001' I traveled to BPXs MPU J & ! Pads and witnessed the semi annual safety valve system testing. As the attached AOGCC Safety Valve System Test Report indiCates I witnessed the testing of 17 wells and 34 components with no failures. Lee Hulme performed the testing today; he demonstrated good test procedures and was a pleasure to work with. I also inspected the well houses on these pads during the SVS testing. All the wellhouses were very clean and the equipment appeared to be in excellent condition. Summary: I witnessed SVS testing at BPXs MPU J &l Pads. MPU J Pad, 11 wells 22 components O~failUres MPU I Pad 6 wells 12 components O. failures 23 wellhouse inspections Attachment: SVS MPU J Pad 4-22-01 CS SVS MPU I Pad 4-22-01 CS X Unclassified Confidential (Unclassified if doc. removed ) Alaska Oil and Gas Conservation Commission Safety Valve System Test Report Operator: BPX Operator Rep: Lee Hulme AOGCC Rep: .... Chuck Schev,,e. Submitted By: 'ChUck Scheve' Date: Field/Unit/Pad: Milne Point / MPU / I Pad Separator psi: LPS 140 lIPS 4/22/01 Well Permit Separ Set L/P Test Test Test Date Oil, WAG, GIN J, Number Number PSI PSI .., TOp Code Code Code Passed GAS or CYCLE I-0i 1~00900! .......... 1-02 1900910 140 100! 95 P P OIL 1-03 1 ~00920 140 100 95 P P .... OIL 1-04 1~00930 140! 100 95 P '"P OIL 1-06 1971950 L 140i 100, 95 p p .......... OIL 'I-07 1951510 140 10(~" 951' P' 'P OII~' I-Og" 1971920 140 100 "95 p ' p ' ~ OIL , J , , , , ,, Wells: 6 Components: 12 Failures: ,._ O. Failure Rate: 0.00% I~ 90 var Remarks: RJF 1/16/01 Page 1 ofl SVS MPU I Pad 4-22-01 CS Alaska Oil and Gas Conservation Commission Safety Valve System Test Report Operator: BPX Operator Rep: Lee Hulme AOGCC Rep: Chuck Scheve Submitted By: 'Ch~¢l~ ~cheve Date: Field/Unit/Pad: Milne Point / MPU / J Pad Separator psi: LPS 140 HPS 4/22/01 Well Permit Separ Set L/P Test Test Test Date oa, WAG, GI~J, Number Number PSI PSI Trip Code Code Code Passed GAS or CYCLE J-01A '" 1991110 140 100 951 e .... e ' " 0IL , ,,, , , ....... J-03 1900970 140 100 95 P e OIL J-'04 1900980 140 100 95 e P ' ' OIL J-05 1910950 140 100 95 P P OIL J-06 1940950 140 100 125 P P OIL i'-07 "' 19i0970 140 ' 100 95 ..... P' P' ~ OIL , , j-08A 1991170 140 100 95 P p OIL , , J-09A 1991140 140 100 110 P P oIL , , J- 10 1941100 140 100 95 P P OIL J-11 1941140 J. 12 .... 19;~i18o .... J- 18 1972200 J-19A 1951700 J-20 1972150 ..... J-21 1972000 140 100 95 P P oIL J-22 1981240 140 100 95 P P OIL J-23 2001200 Wells: 11 Components: 22 Failures: 0 Failure Rate: 0.00% F190 Day Remarks: RJF 1/16/01 Page 1 ofl SVS MPU JPad 4-22-01 CS , .. STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND 1. Status of Well Classification (~ Oil [--I Gas i--I Suspended [] Abandoned i-q Service 2. Name of Operator 7. Permit Number BP Exploration (Alaska)Inc. 98-124 3. Address 8. APl Number P.O. Box 196612, Anchorage, Alaska 99519-6612 50-029-22897 4. Location of well at surface !' .,::;;i.i. li-i;~:,:ii;,?i-~ .--. __ . .~, 9. Unit or Lease Name , , ~;--,~,,-~,,~,~J-~ Milne Point Unit 2151 NSL, 3265 WEL, SEC. 28, T13N, il0E, UM,~'~'?~'-~"--'~'-~ ~i i,,; ,'-' ! ~_~_~'~- '~~ At top of productive interval iI ...¥¢~_i 10. Well Number 2660' NSL, 699' WEL, SEC. 29, T13N, R10E, UM : : ~,,~¢.~~ i- MPJ-22 At total depth ~~'..;, ~.! 11. Field and Pool 2770' NSL, 1057' WEL, SEC. 29, T13N, R10E, UM .. .......... Milne Point Unit / Schrader Bluff 5. Elevation in feet (indicate KB, DF, etc.) 16. Lease Designation and Serial No. KBE = 68.08'I ADL 025517 12. Date Spudded7/14/98 J 13' Date I'D' Reached I 14' Date C°mp" Susp" °r Aband'115' Water depth' if °fish°re 116' N°' °f C°mpleti°ns7/18/98 ?' 7/22/98 N/A MSLI One 17. Total Depth (MD+TVD) 118. Plug Back Depth (MD+TVD)119. Directional Survey 120. Depth where SSSV set 121. Thickness of Permafrost 5760 4299 FTI 5653 4231 FTI [~Yes [--INoI N/A MD { 1800' (Approx.) 22. Type Electric or Other Logs Run MWD, GR/RES, Calipher, GR/JB 23. CASING, LINER AND CEMENTING RECORD CASING SETTING DEPTH HOLE SIZE WT. PER FT. GRADE TOP BOTTOM SIZE CEMENTING RECORD AMOUNT PULLED 13-3/8" 72# L-80 35' 120' 16" 250 sx Arcticset I (Approx.) 5-1/2" 15.5# J-55 33' 5738' 6-3/4" 400 sx Coldset III, 90 sx Foamed 'G', 90 sx 'G' 24. Perforations open to Production (MD+TVD of Top and 25. TUBING RECORD Bottom and interval, size and number) S~ZE DEPTH SET (MD) PACKER SET (MD) 3-3/8" Gun Diameter, 6spf 3-3/8" Gun Diameter, 2 spf 2-3/8", 4.7#, J-55 4941' None MD TVD MD TVD 5050' - 5076' 3868' - 3883' 5402' - 5422' 4073' - 4087' 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. 5102' - 5110' 3894' - 3902' DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED 5140' - 5148' 3918' - 3922' 5294' - 5300' * 4008' - 4012' Freeze Protect with 52 bbls Diesel 5316' - 5330' ** 4022' - 4030' 27. PRODUCTION TEST Date First Production I Method of Operation (Flowing, gas lift, etc.) October 30, 1998I Electric Submersible Pump Date of Test Hours Tested PRODUCTION FOR OIL-BBL GAS-MCF WATER-DEL CHOKE SIZE IGAS-OIL RATIO TEST PERIOD I Flow Tubing Casing Pressure CALCULATED OIL-DEL iGAs-MCF WATER-BBL OIL GRAVITY-APl (CORR) )ress. 24-HOUR RATE 28. CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips. Notation to Section 24 Perforations: · 3-3/8" gun diameter with total of 3 shots · * 3-3/8" gun diameter with total of 9 shots Form 10-407 Rev. 07-01-80 Submit In Duplicate 29. Geologic Markers 30. Formation Tests Measured True Vertical Include interval tested, pressure data, all fluids Marker Name Depth Depth recovered and gravity, GOR, and time of each phase. Schrader Bluff 'D3' 5282' 4002' Schrader Bluff 'C' 5334' 4033' Schrader Bluff 'B' 5391' 4068' 31. List of Attachments Summary of Daily Drilling Reports, Survey 32.1 hereby ce~ th,~ t~h~ _~~,_.~ and correct to the best of my knowledge Signed ~ Ch ~ ~ Title Drilling Superintendent Date M PJ-22 ~ '~,~ '~' 98-124 Prepared By Name/Number: Carol Withey, 564-4114 Well Number Permit No. / Approval No. INSTRUCTIONS GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. ITEM 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. ITEM 5i Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. ITEM 16 AND 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. ITEM 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). ITEM 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. ITEM 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, Other-explain. ITEM 28: If no cores taken, indicate 'none'. Form 10-407 Rev. 07-01-80 Facility Date/Time 12 Jul 98 13 Jul 98 14 Jul 98 15 Jul 98 16 Jul 98 17 Jul 98 18 Jul 98 M Pt J Pad Progress Report Well MPJ-22 Rig Nabors Duration Activity 05:00-06:00 06:00-11:00 11:00-15:00 15:00-18:00 18:00-21:00 21:00-00:00 00:00-06:00 06:00-07:00 07:00-16:30 16:30-18:00 18:00-22:30 22:30-05:00 05:00-06:00 06:00-10:00 10:00-11:00 11:00-15:00 15:00-16:00 16:00-17:30 17:30-19:30 19:30-02:30 02:30-04:30 04:30-06:00 06:00-06:30 06:30-07:30 07:30-03:00 03:00-04:30 04:30-06:00 06:00-09:00 09:00-09:30 09:30-10:30 10:30-11:00 11:00-13:00 13:00-15:00 15:00-01:00 01:00-03:00 03:00-04:30 04:30-06:00 06:00-07:00 07:00-09:30 09:30-10:00 10:00-15:00 15:00-15:30 15:30-16:00 16:00-20:00 20:00-21:00 21:00-00:30 00:30-01:30 01:30-06:00 06:00-10:30 10:30-12:00 12:00-13:00 13:00-13:30 13:30-23:00 23:00-01:30 1 hr 5hr 4 hr 3 hr 3hr 3 hr 6hr 1 hr 9-1/2 hr 1-1/2 hr 4-1/2 hr 6-1/2 hr 1 hr 4hr lhr 4 hr lhr 1-1/2 hr 2 hr 7hr 2hr 1-1/2 hr 1/2 hr 1 hr 19-1/2 hr 1-1/2 hr 1-1/2 hr 3 hr 1/2 hr lhr 1/2 hr 2 hr 2hr 10 hr 2 hr 1-1/2 hr 1-1/2 hr 1 hr 2-1/2 hr 1/2 hr 5hr 1/2 hr 1/2 hr 4 hr lhr 3-1/2 hr lhr 4-1/2 hr 4-1/2 hr 1-1/2 hr lhr 1/2 hr 9-1/2 hr 2-1/2 hr Rig moved 0.00 % Rig moved 0.00 % Rig moved 25.00 % Rig moved 25.00 % Held safety meeting Rig moved 25.00 % Rig moved 100.00 % Rig moved 100.00 % Rigged up Divertor Rigged up Tubing handling equipment Racked back drill pipe Racked back Tubing Made up BHA in derrick Made up BHA in derrick Serviced Top drive Rig waited · Production facilities Functioned Divertor Repaired High pressure lines Drilled to 900.0 ft Drilled to 745.0 ft Repaired Top drive Drilled to 900.0 ft Circulated at 900.0 ft Pulled out of hole to 700.0 ft Drilled to 3320.0 ft Circulated at 3320.0 ft Pulled out of hole to 929.0 ft Pulled out of hole to 927.0 ft Pulled BHA Held safety meeting Pulled BHA Made up BHA no. 2 R.I.H. to 1820.0 ft Reamed to 2934.0 ft Drilled to 3095.0 ft Circulated at 3095.0 ft Pulled out of hole to 2400.0 fi Pulled out of hole to 1569.0 fi R.I.H. to 3095.0 ft Serviced Top drive Drilled to 3670.0 ft Circulated at 3670.0 ft Pulled out of hole to 3000.0 ft Drilled to 4052.0 ft Circulated at 4052.0 ft Pulled out of hole to 1500.0 fi R.I.H. to 4052~0 ft Drilled to 4450.0 ft Drilled to 4913.0 ft Circulated at 4913.0 ft Pulled out of hole to 3960.0 ft R.I.H. to 4913.0 ft Drilled to 5760.0 ft Circulated at 5760.0 ft Page Date 1 24 November 98 Facility Date/Time 19 Jul 98 20 Jul 98 21 Jul 98 22 Jul 98 M Pt J Pad Progress Report Well MPJ-22 Rig Nabors~8~ ~ ~ ~ Page Date Duration Activity 01:30-06:00 06:00-07:30 07:30-08:00 08:00-09:00 09:00-11:30 11:30-15:30 15:30-19:00 19:00-20:30 20:30-21:30 21:30-06:00 06:00-09:00 09:00-10:00 10:00-18:00 18:00-20:30 20:30-21:30 21:30-23:30 23:30-00:00 00:00-01:00 01:00-03:00 03:00-05:00 05:00-06:00 06:00-08:30 08:30-12:30 12:30-13:30 13:30-16:30 16:30-20:30 20:30-22:00 22:00-23:30 23:30-06:00 06:00-07:00 07:00-08:00 08:00-09:00 09:00-12:00 4-1/2 hr 1-1/2 hr 1/2 hr 1 hr 2-1/2 hr 4 hr 3-1/2 hr 1-1/2 hr 1 hr 8-1/2 hr 3 hr lhr 8hr 2-1/2 hr 1 hr 2 hr 1/2 hr 1 hr 2 hr 2 hr lhr 2-1/2 hr 4hr 1 hr 3hr 4hr 1-1/2 hr 1-1/2 hr 6-1/2 hr 1 hr 1 hr lhr 3 hr Pulled out of hole to 900.0 ft Backreamed to 3187.0 ft Reamed to 3197.0 ft R.I.H. to 5760.0 ft Circulated at 5760.0 ft Pulled out of hole to 0.0 ft Conducted electric cable operations Pulled BHA Rigged up Casing handling equipment Ran Casing to 5738.0 ft (5-1/2in OD) Circulated at 5652.0 ft Held safety meeting Ran Tubing in stands to 5652.0 ft Circulated at 5652.0 ft Held safety meeting Mixed and pumped slurry - 190.600 bbl Cleared B ell nipple Circulated at 5652.0 ft Mixed and pumped slurry - 30.000 bbl Rigged down Tubing handling equipment Circulated at 5595.0 ft Circulated at 5595.0 ft Laid down 1825.0 ft of Tubing Freeze protect well - 52.000 bbl of Diesel Laid down 3770.0 ft of Tubing Rigged down Divertor Rigged up Casing head Tested Casing head Laid down 8000.0 ft of 4in OD drill pipe Laid down 8000.0 ft of Drillpipe Removed Divertor Serviced Block line Rig waited · Orders 2 24 November 98 Facility Date/Time 15 Aug 98 16 Aug 98 17 Aug 98 18 Aug 98 19 Aug 98 20 Aug 98 21 Aug 98 M Pt J Pad Progress Report Well MPJ-22 Rig Nabors 5S Page Date Duration Activity 06:00-12:00 12:00-12:30 12:30-14:00 14:00-15:30 15:30-18:00 18:00-01:00 01:00-03:30 03:30-06:00 06:00-10:00 10:00-12:00 12:00-14:30 14:30-15:00 15:00-17:00 17:00-18:00 18:00-23:30 23:30-00:30 00:30-06:00 06:00-06:30 06:30-10:00 10:00-13:30 13:30-14:00 14:00-15:00 15:00-18:00 18:00-18:30 18:30-01:00 01:00-02:00 02:00-06:00 06:00-06:30 06:30-10:00 10:00-11:00 11:00-13:30 13:30-14:00 14:00-03:30 03:30-05:00 05:00-06:00 06:00-06:30 06:30-09:30 09:30-10:30 10:30-02:00 02:00-06:00 06:00-06:30 06:30-07:30 07:30-13:00 13:00-13:30 13:30-02:00 02:00-06:00 06:00-06:30 06:30-09:00 09:00-10:00 10:00-11:30 11:30-13:30 6 hr 1/2 hr 1-1/2 hr 1-1/2 hr 2-1/2 hr 7 hr 2-1/2 hr 2-1/2 hr 4 hr 2hr 2-1/2 hr 1/2 hr 2hr 1 hr 5-1/2 hr lhr 5-1/2 hr 1/2 hr 3-1/2 hr 3-1/2 hr 1/2 hr lhr 3hr 1/2 hr 6-1/2 hr lhr 4hr 1/2 hr 3-1/2 hr 1 hr 2-1/2 hr 1/2 hr 13-1/2 hr 1-1/2 hr lhr 1/2 hr 3 hr 1 hr 15-1/2 hr 4hr 1/2 hr 1 hr 5-1/2 hr 1/2 hr 12-1/2 hr 4 hr 1/2 hr 2-1/2 hr 1 hr 1-1/2 hr 2 hr Rig moved 100.00 % Held safety meeting Removed Xmas tree Rigged up All rams Rigged up All rams Rigged up All rams Tested All rams Ran Tubing to 250.0 ft (2-3/8in OD) Ran Tubing to 4735.0 ft (2-3/8in OD) Circulated at 4735.0 ft Pulled Tubing in stands to 0.0 ft Laid down 0.0 ft of Tubing Ran Tubing to 4840.0 ft (2-3/8in OD) Circulated at 4840.0 ft Repaired Mud pump power end Ran Tubing in stands to 4865.0 ft Circulated at 5029.0 ft Held safety meeting Washed to 5600.0 ft Circulated at 5600.0 ft Flow check Laid down 620.0 ft of Tubing Pulled Tubing in stands to 0.0 ft Held safety meeting Perforated Conducted electric cable operations Installed Permanent packer Held safety meeting Ran Tubing in stands to 5160.0 ft Set packer at 5032.0 ft with 2500.0 psi Pulled Tubing in stands to 0.0 ft Serviced Drillfloor / Derrick Rigged up sub-surface equipment - ESP Rig waited: Assessed situation Pulled Tubing in stands to 1900.0 ft Held safety meeting Pulled Tubing in stands to 0.0 ft Functioned ESP Rig waited: Equipment Repaired ESP Held safety meeting Repaired ESP Installed ESP Tested ESP - Via annulus Installed ESP Installed Cable Held safety meeting Installed Electric cable Installed Tubing hanger Removed BOP stack Installed Xmas tree , 24 November 98 Milne Point Unit Alaska State Plane Zone 4 Milne Point J Pad MPJ-22 RECEIVED AUG 1 2 1998 BPXA PDC SURVEY*REPORT August, 1998 ORI61NAL Your Ref: AP1-500292289700 Last Survey Date 19-July-98 Job# AKMMS0285 KBE- 68.08' DRILLING SERVICES Survey Ref: svy2175 Milne Point Unit Measured Depth (ft) Incl. Azim. ~=~ Sub-Sea Depth (ft) Vertical Depth (ft) 0.00 0.000 0.000 -68.08 0.00 195.58 0.860 121.480 127.49 195.57 228.98 0.870 112.600 160.89 228.97 318.98 1.040 120.340 250.88 318.96 408.34 1.050 200.770 340.23 408.31 500.31 1.970 230.530 432.16 500.24 590.38 4.690 245.220 522.07 590.15 682.46 5.500 250.240 613.79 681.87 772.01 5.170 253.360 702.95 771.03 862.70 4.780 259.400 793.30 861.38 962.71 6.960 246.600 892.79 960.87 1056.88 7.480 247.960 986.21 1054.29 1152.93 7.900 250.270 1081.39 1149.47 1247.72 10.720 248.590 1174.93 1243.01 1343.69 13.870 252.860 1268.69 1336.77 1439.79 15.870 252.430 1361.56 1429.64 1534.58 18.980 251.100 1451.99 1520.07 1630.54 20.750 251.310 1542.24 1610.32 1726.11 21.660 253.900 1631.34 1699.42 1821.52 25.750 252.110 1718.68 1786.76 1916.40 26.300 250.630 1803.94 1872.02 2012.81 26.040 247.610 1890.47 1958.55 2108.64 27.290 251.860 1976.12 2044.20 2204.17 29.250 261.110 2060.29 2128.37 2299.48 32.880 270.840 2141.97 2210.05 2395.38 34.730 277.960 2221.68 2289.76 2490.49 37.720 284.980 2298.43 2366.51 2586.00 41.290 288.980 2372.13 2440.21 2647.30 41.890 289.170 2417.97 2486.05 2747.13 43.290 289.770 2491.47 2559.55 Sperry-Sun Drilling Services Survey Report for MPJ-22 Your Ref: API-500292289700 Local Coordinates Global Coordinates Do_~leg Vertical Northings Eastings Northings Eastings Rate Section (ft) (ft) (ft) (ft) (°/100ft) (ft) 0.00 N 0.00 E 6014545.25 N 552056.91E 0.00 0.77 S 1.25 E 6014544.49 N 552058.17 E 0.440 -1.38 0.99 S 1.70 E 6014544.26 N 552058.62 E 0.402 -1.86 1.67 S 3.04E 6014543.60 N 552059.96 E 0.237 -3.31 2.85 S 3.44 E 6014542.43 N 552060.37 E 1.510 -3.94 4.64 S 1.93 E 6014540.62 N 552058.87 E 1.283 -2.80 7.17 S 2.61W 6014538.06 N 552054.35 E 3.141 1.15 10.24 S 10.18W 6014534.94 N 552046.80 E 1.003 7.96 12.84S 18.09W 6014532.28 N 552038.91E 0.491 15.20 14.71 $ 25.72W 6014530.36 N 552031.30 E 0.720 22.31 17.88 S 35.38W 6014527.12 N 552021.66 E 2.530 31.15 22.45 S 46.29W 6014522.48 N 552010.77 E 0.581 40.95 27.02 S 58.30W 6014517.82 N 551998.80 E 0.543 51.82 32.44 S 72.65W 6014512.30 N 551984.49 E 2.988 64.81 39.09 S 91.95W 6014505.52 N 551965.23 E 3.414 82.42 46.45 S 115.49W 6014497.99 N 551941.75 E 2.084 104.04 55.36 S 142.43W 6014488.89 N 551914.87 E 3.308 128.69 65.86 S 173.30W 6014478.18 N 551884.07 E 1.846 156.88 76.18 S 206.29W 6014467.63 N 551851.16 E 1.366 187.18 87.43 S 242.94W 6014456.12 N 551814.58 E 4.352 220.89 100.74 S 282.39W 6014442.54N 551775.23 E 0.897 256.93 115.88 S 322.10W 6014427.12 N 551735.62 E 1~407 292.87 130.74 $ 362.44W 6014411.98 N 551695.40 E 2.379 329.47 141.17 S 406.33W 6014401.25 N 551651.57 E 5.018 370.44 144.39 S 455.25W 6014397.68 N 551602.68 E 6.490 417.77 140.22 S 508.36W 6014401.48 N 551549.54 E 4.556 470.65 128.94 S 563.33W 6014412.37 N 551494.49 E 5.373 526.77 111.13 S 621.39W 6014429.78 N 551436.32 E 4.589 587.19 97.83 $ 659.84W 6014442.81N 551397.77 E 1.000 627.52 75.31S 723.53W 6014464.88 N 551333.92 E 1.460 694.41 Comment Alaska State Plane Zone 4 Milne Point J Pad Continued... 10 August, 1998 - 12:51 - 2 - DrillQuest Milne Point Unit Measured Depth (ft) Incl. Azim. =~. Sub-Sea Depth (ft) Vertical Depth (ft) 2839.96 43,590 289,890 2558.87 2626.95 2934,59 43.500 289.170 2627.46 2695.54 3030.68 48.760 289.930 2694.03 2762.11 3124.52 55.710 286.660 2751.48 2819.56 3220.17 56.140 286.020 2805.07 2873.15 3316.36 54.230 286,180 2859.98 2928.06 3412.00 53.930 286.130 2916.09 2984.17 3507.53 55.340 287.040 2971.38 3039.46 3604.34 56.240 286.060 3025.81 3093.89 3699.23 56,440 286.560 3078.40 3146.48 3795.28 55.960 286.400 3131.84 3199.92 3889.89 57.370 285.350 3183.83 3251.91 3987,23 57.170 285.180 3236.46 3304.54 4081,96 55.890 284.850 3288.70 3356.78 4178,00 55.110 285.670 3343.10 3411.18 4273,18 57.900 284,930 3395.62 3463.70 4369,05 60.310 282.230 3444.85 3512.93 4463.76 58,550 282,050 3493.02 3561.10 4559,78 57,270 282,370 3544.03 3612.11 4656.42 57,520 284,280 3596.10 3664.18 4751.63 59.340 286.240 3645.95 3714.03 4847.82 60.000 287.640 3694.53 3762.61 4941.69 59.230 289.240 3742.01 3810.09 5037.54 56.370 288.710 3793.08 3861.16 5133.43 55.450 288.910 3846.82 3914.90 5228.54 53.700 287.900 3901.95 3970.03 5323.77 52,930 288.250 3958.84 4026.92 5419.96 52.190 287.930 4017.32 4085.40 5516.11 51.750 286.930 4076.56 4144.64 5611.26 50.800 286,040 4136.08 4204.16 Sperry-Sun Drilling Services Survey Report for MPJ-22 Your Ref: API-500292289700 Local Coordinates Global Coordinates Dog_._leg Vertical Northings Eastings Northings Eastings Rate Section (ft) (ft) (ft) (ft) (°/100ft) (ft) 53.66 S 783,58W 6014486,12 N 551273,72 E .0,335 757,54 31,87 S 845,02W 6014507,48 N 551212,13 E 0.533 822,08 8.67 S 910,27W 6014530,21 N 551146,72 E 5,504 890,62 14,50 N 980,67W 6014552,89 N 551076,16 E 7,900 964,22 36,79 N 1056,70W 6014574.65 N 550999,98 E 0.714 1043,15 58.68 N 1132,57W 6014596,02 N 550923,96 E 1,990 1121,85 80,23 N 1206,97W 6014617.05 N 550849,41 E 0,317 1199,04 102.48 N 1281,62W 6014638,77 N 550774.60 E 1,668 1276,62 125,28 N 1358,37W 6014661.03 N 550697,70 E 1,251 1356,35 147,46 N 1434,17W 6014682,68 N 550621,75 E 0,487 1435,04 170.10 N 1510,70W 6014704.79 N 550545,05 E 0.519 1514,54 191,71 N 1586,73W 6014725,87 N 550468,88 E 1,755 1593,34 213.27 N 1665.73W 6014746.88 N 550389,73 E 0.253 1675,04 233.75 N 1742,05W 6014766,82 N 550313,27 E 1,382 1753.90 254.58 N 1818.41W 6014787.12 N 550236.77 E 1.075 1832.87 275,51 N 1894,96W 6014807.51 N 550160.07 E 3.002 1912,05 294.80 N 1974.92W 6014826.24 N 550079,98 E 3.487 1994,24 311.95 N 2054.63W 6014842,84 N 550000,15 E 1,865 2075.77 329.15 N 2134.14W 6014859.48 N 549920.52 E 1,363 2157,11 347.92 N 2213.35W 6014877.69 N 549841,18 E 1,685 2238,47 369,28 N 2291,60W 6014898,51N 549762.79 E 2.594 2319.39 393.47 N 2371,02W 6014922.14 N 549683.20 E 1~431 2402.03 419,08 N 2447,83W 6014947,22 N 549606.21 E 1.684 2482.39 445.45 N 2524.52W 6014973.05 N 549529.34 E 3.020 2562.77 471,06 N 2599.69W 6014998.13 N 549453,99 E 0.975 2641.52 495,53 N 2673,23W 6015022,09 N 549380.29 E 2,033 2718,44 519.23 N 2745.83W 6015045.28 N 549307,52 E 0.861 2794,29 542.94 N 2818.42W 6015068.49 N 549234.76 E 0.813 2870.14 565,63 N 2890.68W 6015090,67 N 549162,35 E 0,938 2945,45 586.70 N 2961.86W 6015111.24 N 549091,03 E 1.237 3019.39 Comment Alaska State Plane Zone 4 Milne Point J Pad Continued,., 10 August, 1998- 12:52 -3- DrillQuest Sperry-Sun Drilling Services Survey Report for MPJ-22 Your Ref: AP1-500292289700 Milne Point Unit Measured ~, Sub-Sea Vertical Depth Incl. Azim. Depth Depth (ft) (ft) (ft) Local Coordinates Global Coordinates D_og_...legVertical Northings Eastings Northings Eastings Rate Section (ft) (ft) (ft) (ft) (°/100ft) (ft) 5692.06 50.030 286.460 4187.57 4255.65 5760.00 50.030 286.460 4231.21 4299.29 604.12 N 3021.64W 6015128.24 N 549031.12 E 1.034 3081.44 618.87 N 3071.57W 6015142.65 N 548981.09 E 0.000 3133;30 All data is in feet unless otherwise stated. Directions and coordinates are relative to True North. Vertical depths are relative to Well. Northings and Eastings are relative to Well. The Dogleg Severity is in Degrees per 100ft. Vertical Section is from Well and calculated along an Azimuth of 281.392° (True). Based upon Minimum Curvature type calculations, at a Measured Depth of 5760.00ft., The Bottom Hole Displacement is 3133.30ft., in the Direction of 281.392° (True). Comments Measured Depth 0.00 5760.00 Station Coordinates TVD Northings Eastings Comment (ft) (ft) (ft) 0.00 0.00 N 0.00 E Tie-on Survey 4299.29 618.87 N 3071.57 W Projected Survey Comment Projected Survey Alaska State Plane Zone 4 Milne Point J Pad 10 August, 1998 - '12:52 - 4 - DrillQuest 0 I~t I L-I--I IM G SEI:tL~I C E S To: WELL LOG TRANSMITTAL State of Alaska Alaska Oil and Gas Conservation Comm. Atm.: Lori Taylor 3001 Porcupine Dr. Anchorage, Alaska 99501 MWD Formation Evaluation Logs - MPJ-22, AK-MM-80285 November 18, 1998 MPJ-22: 2" x 5" MD Resistivity and Gamma Ray Logs: 50-029-22897-00 2" x 5" TVD Resistivity and Gamma Ray Logs: 50-029-22897-00 1 Blueline 1 Folded Sepia 1 Blueline 1 Folded Sepia PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ~ ATTACHED COPllgS OF THE TRANSMITTAL LETrER TO ~ ATTENTION OF: Sperry-Sun Drilling Services Attn: Ali Turker 5631 Silverado Way, Suite G. Anchorage, Alaska 99518 --. ~ .-~..~ ... Date: i.~r:\! , ~,,,n'4r,,.. C'-.,': i,d .t'-. :: ~,;-2',:; .... BP Exploration (Alaska) Inc. Petro-technical Data Center, MB3-3 900 E. Benson Blvd. Anchorage, Alaska 99519-6612 Signed: 5631 Silverado Way, Suite G · Anchorage, Alaska 99518 · (907) 273-3500 · Fax (907) 273-3535 A Halliburton Company OF:III--LING WELL LOG TRANSMITTAL To: State of Alaska Alaska Oil and Gas Conservation Comm. Atm.' Loft Taylor 3001 Porcupine Dr. Anchorage, Alaska 99501 November 18, 1998 MWD Formation Evaluation Logs MPJ-22, AK-MM-80285 1 LDWG formatted Disc with verification listing. API#: 50-029-22897-00 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING THE ATYACHED COPIES OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: Sperry-Sun Drilling Services Attn: Ali Turker 5631 Silverado Way, Suite G. BP Exploration (Alaska) Inc. Petro-technical Data Cemer, MB3-3 900 E. Benson Blvd. Anchorage, Alaska 99519-6612 5631 Silverado Way, Suite G · Anchorage, Alaska 99518 · (907) 273-3500 · Fax (907) 273-3535 A Halliburton Company 9/25/98 GeoQuest 3940 Arctic Blvd Anchorage, AK 99503 ATTN: Sherrie NO. 11515 Company: Field: Alaska Oil & Gas Cons Comm Attn: Lori Taylor 3001 Porcupine Drive Anchorage, AK 99501 Milne Point (Cased Hole) Well Job # Log Description Date BL RF Sepia LIS Tape MPB-03 JEWELRY LOG 9 8 0 8 2 3 1 1 MPB-04 JEWELRY LOG 9 8 0 8 2 3 1 1 MPB-10 JEWELRY LOG 9 8 0 8 2 3 I 1 MPB-15 JEWELRY LOG 9 8 0 8 2 5 1 1 MPB-20 JEWELRY LOG 9 8 0 91 1 I 1 MPC-22A TUBING PUNCHER RECORD 9 8 0 8 0 2 I 1 MPE-21 PERFORATING RECORD 9 8 0 9 0 3 I 1 M P E-30 PERFORATING RECORD 9 8 0 9 0 7 1 1 MPH-10 PERFORATING RECORD 9 8 0 8 2 7 I 1 MPH-10 PERFORATING RECORD 9 8 0 8 2 9 1 1 , M P H- 10 PERFORATING RECORD 9 8 0 8 31 I 1 ' M P H- 11 PERFORATION RECORD 9 8 0 8 0 8 1 1 M PH-14 PERFORATING RECORD 9 8 0 7 2 8 I 1 M PH-14 PERFORATING RECORD 9 8 0 7 3 0 I 1 M PH-14 PACKER SETFING RECORD 9 8 0 8 01 1 1 MPJ-22 PERFORATION RECORD 9 8 0 7 3 0 i 1 M PJ-22 BRIDGE PLUG SET RECORD 9 8 0 813 I 1 M PJ-22 PERFORATION RECORD 9 8 0 817 I 1 MPK-21 ~/c__ JEWELRY LOG 98091 3 I 1 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO: BP Exploration (Alaska) Inc. Petrotectnical Data Center MB3-3 900 E. Benson Blvd. Anchorage, Alaska 99519-6612 Date Delivered: Schlumberger GeoQuest 3940 Arctic Blvd Anchorage, AK ,,~¢5g3 GeoQuest 500 W. International Airport Road Anchorage, AK 99518-1199 ATTN: Sherrle NO. 11438 Company: Field: Alaska OII & Gas Cons Comm Attn: Lori Taylor 3001 Porcupine Drive Anchorage, AK 99501 MIIne Point (Cased Hole) 8/18/98 Well Job # Log Description. Date BL RF Sepia LIS Tape MPU F-62 L~ (-.- INJEcTION PROFILE 980706 I 1 MPG-13 INJECTION PROFILE 9 8 0 718 I 1 MPH-09 STATIC TEMPERATURE SURVEY 9 8 0 719 1 1 , M PH-09 STATIC TEMPERATURE SURVEY 9 8 0 719 1 1 MPH-09 STATIC TEMPERATURE SURVEY 9 8 0 719 1 1 MPH-09 CEMENT MAP LOG 980720 !, 1 MPJ-22 4 ARM CALIPER 9 8 0 719 I 1 ,, , · , , · , PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO: BP Exploration (Alaska) Inc. Petrotectnical Data Center MB3-3 900 E. Benson Blvd. Anchorage, Alaska 99519-6612 Date Delivered: RECEIVED AUG 2 0 1998 Alaska Oil & Gas Cons. 6~mmi~ion Schlumberger GeoQuest 500 W. International Airport Road Anchorage, Alaska 99618-1199 TONY KNOWLES, GOVEBNOR ALASKA OIL AND GAS CONSERVATION COMMISSION 3001 PORCUPINE DRIVE ANCHORAGE, ALASKA 99501-3192 PHONE: (907) 279-1433 FAX: (907) 276-7542 July 1, 1998 T. Brcnt Reeves Drilling Engineering Supervisor BP Exploration (Alaska) Inc. P O Box 196612 Anchorage, AK 99519-6612 ac. Milne Point Unit MPJ-22 BP Exploration (Alaska) Inc. Permit No. 98-124 Sur. Loc.' 215 I'NSL. 3265'WEL. Sec. 28. T13N. R10E. UM Btmhole Loc: 2714'NSL. 1047'WEL. Sec. 29, T13N. R10E. UM Dear Mr. Reeves: Enclosed is thc approved application for permit to drill the above referenced well. The permit to drill does not exempt you from obtaining additional permits required by law from other governmental agencies, and does not authorize conducting drilling operations until all other required permitting determinations arc made. Blowout prevcntion equipment (BOPE) must be tested in accordance with 20 AAC 25.035. Sufficient notice (approximately 24 hours) of the BOPE test performed before drilling below the surface casing shoe must be given so that a representative of the Commission may witness the test. Notice max; be given by contacting the Commission petroleum field inspector on the North Slope pager at 659-3607. Si Robert N. Christenson. P.E. Commissioner BY ORDER OF THE COMMISSION dlf enclosures CC: Department of[' Fish & Game. ttabitat Section w/o encl. Department or' Environmental Conservation xwo encl. STATE OF ALASKA ALASKA I.~,_ AND GAS CONSERVATION COM .... ,SSION PERMIT TO DRILL 20 AAC 25.005 la. Type of work [] Drill [] Redrill Ilb. Type of well [] Exploratory [] Stratigraphic Test I~ Development Oil [] Re-Entry I'-I DeepenI [] Service [] Development Gas []Single Zone I--I Multiple Zone 2. Name of Operator 5. Datum Elevation (DF or KB) 10. Field and Pool BP Exploration (Alaska) Inc. Plan KBE = 57' Milne Point Unit / Schrader Bluff 3. Address ~6. Property Designation P.O. Box 196612, Anchorage, Alaska 99519-6612 ADL 025517 4. Location of well at surface 7. Unit or Property Name 11. Type Bond (See 20 AAC 25.025) 2151' NSL, 3265' WEL, SEC. 28, T13N, R10E, UM Milne Point Unit At top of productive interval 8. Well Number Number 2S100302630-277 2588' NSL, 535' WEL, SEC. 29, T13N, R10E, UM MPJ-22 At total depth 9. Approximate spud date Amount $200,000.00 2714' NSL, 1047' WEL, SEC. 29, T13N, R10E, UM 08/10/98 12. Distance to nearest property line} 13. Distance to nearest well 14. Number of acres in property 15. Proposed depth (MD and TVD) ADL 025906, 1047'I No Close Approach 2560 5744' MD / 4301' TV• 16. To be completed for deviated wells 17. Anticipated pressure {see 20 AAC 25.035 (e) (2)} Kick Off Depth 500' MD Maximum HoleAngle 55.615° Maximum surface 1360 psig, At total depth (TVD) 3915' / 1750 psig 18. Casing Program Specifications Setting Depth Size Top Bottom Quantity of Cement Hole Casing Weight Grade Coupling Length MD TVD MD TVD (include stage data) 16" 13-3/8" 72# L-80 BTC-M 120' 32' 32' 112' 112' 250 sx Arcticset I (Approx.) 6-3/4" 5-1/2" 15.5# L-80 BTC-M 5744' 31' 31' 5777' 4334' 187 sx CS III, 170 sx Foamed, 87 sx 'G' 19. To be completed for Redrili, Re-entry, and Deepen Operations. Present well condition summary Total depth: measured feet Plugs (measured) true vertical feet Effective depth: measured feet Junk (measured) true vertical feet Casing Length Size Cemented MD TVD Structural Conductor Surface Intermediate Liner i:':~' ii:; "i.~ iii ': '.~'~ Perforation depth: measured ?.~ ~ i ,~ : .... 20. Attachments [] Filing Fee [] Property Plat [] BOP Sketch [] Diverter Sketch [] Drilling Program [] Drilling Fluid Program []Time vs D. epth Plot [] Refraction Analysis [] Seabed Report [] 20 AAC 25.050 Requirements 21. I hereby certify that t~o~Sing is true ~u~cg~ect to the b~st of my knowledge Signed ~" - · .[~r~~~/~'~,~fi~ ~/~e DdllingEngineedngSupervisor Date / Commission Use Only Permit..~lumber I APl Number ApB. royal Date.. I See cover letter ~'-/2__ _z//, 50- 0 2_ ~ - .Z_. 2 ~' ~..~ "7 ~,~'~,~, for other requirements Conditions of Approval: Samples Required []Yes I'~No Mud Log Required r-lYes [~ No Hydrogen Sulfide Measures ['-lYes '[~ No Directional Survey Required ~Yes [-I No Required Working Pressure for BOPE •2M; J~]3M; []SM; I--IIOM; D15M Other: Approved By ORIGINAL SIGNEDBY by order of ~.-..'-=.-t..H ~hfi~t~nsorl Commissioner the commission Date ¢'"~ "__ Form 10-401 Rev. 12-01-85 Submit In Triplicate Shared Services Drilling Contact: I Well Name: IType of Well (producer or injector): R. George Scoff IMP J-22 I Well Plan Summary ISchrader Bluff Producer ISurface Location: Target Location: Bottom Hole Location: 2151' FSL, 3265' FEL, S28 T13N R10E UM 2588' FSL, 535' FEL, S29 T13N R10E UM 2714'FSL,1047' FEL, S29 T13N R10E UM I AFE Number: 1337138 I Estimated Start Date: Aug 98 I I Rig: I Nabors 27E I Operatin~l days to complete: IUD: Is744' II TVD: 14 0 ' I 16.0 I KBE: [57ft 564-5862 [Well Desitin: Schrader Bluff Producer Formation Markers: Formation Tops MD TVDSS KOP 5OO 5OO Base of Permafrost 1884' 1775' Top of Ugnu 4215' 3304' Top M Sand 4629' 3538' Top NA (Target) 5055' 3790' Top of the N-A (EMW 8.6 ppg) Base Of Schrader 5444' 4040' TD 5744' 4233' TD at 300' MD past base of Schrader Bluff Casin~lrrub in~ Pro~lram: Hole ~,ize "Csg~ Wt/Ft Grade Conn. Length Top Bottom Tb~l O.D. MD/TVD MD/TVD (bkb) 16" 13-3/8" 72# L-80 M BTC 120' 32'/32' 112' / 112' 6-3/4" 5-1/2 .... 15.5# L80 MBTC 5744' 31 '/31' 5777' / 4334' Internal yield pressure of the 5-1/2 .... 15.5# casing is 4,810 psi. With a full column of gas (0.10 psi/fi) to the reservoir at +3915' TVDSS the maximum anticipated surface pressure assuming a reservoir pressure of 1750 psi (8.6 ppg EMW), is 1360 psi, well below the internal yield pressure rating of the 5-1/2" casing (4810psi). ** Note: The top joint in the 5-1/2" surface casing consists of I joint of 7" 26# BTC-MOD L-80, this is required to accommodate the penetrater offset> This will require a X-over to the 5-1/2" 15.5# J-55 BTC- MOD casing. Properties of this top joint are Coupling O.D.-7.656", I.D.-6.276", Drift-6.151", Collapse- 5410psi, Burst-7240psi,yield-604M lbs. MP J-22 Well Plan · PAGE 3 8 Jun 98 Logging Program: Open Hole Logs: MWD directional only from surface to 2200' MD. 4-Arm Caliper Log From T.D. to 151' M.D. (Base of 13-3/8" Conductor. MWD directional and LWD (GR/Resestivity/ROP) from top of Ugnu to TD with a controlled drilling speed of no more than 200 fi/hr. Cased Hole Logs: A USIT LOG WILL BE RUN FROM T.D TO THE BASE OF THE CONDUCTOR. Mud loggers are NOT required for this well. Mud Program- ISpecial design considerations lAn inhibitive polymer mud is planned from surface to TD. Solids control is critical to the success of the system. Surface Mud Properties: I Density Marsh Yield LSRV 10 min pH Fluid (PPG) Viscosity Point gel Loss 8.6 150 40 50,000 8.5 NC to 9.0 Production Mud Properties: I Density Marsh Yield 10 sec 10 min pH Fluid (PPG) Viscosity Point gel gel Loss 9.0 50 30 14 16 8.5 <6 to to to to 9.5 60 35 9.0 LSVR- 40,000+, Fann-600/50-55, 300/40-45, 200/33-37, 6/18-20, 3/14-17 Well Control: Well control equipment consists of: Rig (Nabors 27E) ,13-5/8"", 5000 psi W.P.Annular and 3000 psi Diverter with 10" Diverter Line. A Completion/Workover Rig with 5000 psi W.P. variable pipe rams, blind/shear r~ms, and annular preventer will be used for the completion and is capable of handling maximum potential surface pressures. ' Diverter, BOPE, and drilling fluid system schematics are attached. Directional- IKOP: 1500' MD Maximum Hole Angle: Close Approach Well: t55.615° NONE Waste Management: Cuttings Handling: All cuttings will be hauled to the CC-2A or Drill Site #4 facility. Fluids Handling: All drilling and completion fluids will be hauled to Drill site #4 or CC-2A for injection. Annular Injection: We are currently looking into this option, if Permitted a procedure and copy of permit will be issued. MP J-22 Well Plan PAGE 4 8 Jun 98 MP J-22 Proposed Summary of Operations . 2. 3. 4. 5. 6. 7. . . Drill and Set 13-3/8" Conductor. Weld a starting head on conductor. Prepare location for rig move. MIRU Nabors 27E rig. NU and function test 13-3/8 .... diverter. Spud Mud Will Have been Built as per Mud Program. Drill a 6-3/4" surface hole as per directional plan. Run Directional MWD from surface to +/- 2200'MD. POOH. MU a PDC bit on a motor, with Directional MWD and LWD GR/RES/ROP. Drill 6-3/4" hole to TD as per directional plan. Stand back drill string and run a 4-Armed Caliper from TD to the bottom of the 13-3/8" conductor. Following this, the casing will be cemented. (A 2-7/8" work string will be picked up and stood back prior to running the casing to reduce the time the casing is on bottom prior to cementing.) Run and Cement 5-1/2", 15.5#, J-55, Buttress-Modified casing. Refer to attached Detailed Cement Program and Back-up Port Collar Operating Procedure. Following cementing displace the casing to sea water. POOH freeze protect from 2000'MD to Surface. Following the cementing of the well and the landing of the 7" landing joint the casing will be tested to 3850 psi.(80% of internal yield). The Diverter system will be rigged down and the frac head provided by the Well Services group installed, and tested, POST DRILL AND CASE: ', Nabors Rig 4ES will run the completion on this well following rigless completion work. 1. The first part of the completion is planned to be done rigless. This includes perforating, frac'ing clean out. Rig 4ES is planned to be used for setting the screen and for the final running of the completion assembly. The well will be completed with 2-3/8" tubing. 2. A completion program will be issued for this. It is planned to run an ESPC completion with Centrilift Heat Trace to a depth of 5000'MD. Install Surface Lines and Wellhouse and turn well over to production. MP J-22 Well Plan PAGE 5 8 Jun 98 DRILLING HAZARDS AND RISKS: See the latest Milne Point J-Pad Data Sheet for offset information on J pad. Listed below are specific hazards for J-22. The MPU PE group will be perforating, hydraulic fracturing and cleaning out this as per the completion program. 1. Hydrates: ' HYDRATES HAVE NOT BEEN ENCOUNTERED ON WELLS DRILLED AT MILNE POINT 'J' PAD,. If encountered mud will be treated with 1-1.5 ppb Lechithin (See Attached Mud Program). 2. Close Approach: There are no close approach problems with MP J-22. 3. Lost Circulation: There have not been any significant lost circulation incidents reported on any of the J Pad wells. Some losses have occurred while cementing the Surface Casing. Top cement jobs were required on recent cement jobs. J-04 & J-06 experienced some losses while cementing. Some recent surface casing jobs required to be washed down 12'-40', J-10,J-11 & J-12 were in this catagory. 4. Stuck Pipe Potential: There have been STUCK PIPE incidents on J-Pad wells. On the J-16 well when running the 7" main string it was stuck with shallow set surface casing set on this Kuparuk well. (see J Pad Data Sheet.) If heavy gravel's are encountered while drilling the surface hole section, operations should be immediately stopped and the mud funnel viscosity is increased to help clean hole. While drilling below 2500' make frequent short trips every 1000'md minimum as dictated by hole conditions. 5. Formation Pressure: The Schrader Bluff zone is anticipated to be normally pressured with a gradient of 0.4476 psi/ft and a pressure of 1750 psi in the middle of the Schrader Bluff at 3915' TVDSS. 6. Directional Drillinq Concerns MP E-21 will be an ultra slim 6-3/4" hole drilled to a T.D. of 5744' md. KOP is 500' md and a variable build rate from that point will yield a sail angle of 55.615° at 2813' md. At 4757' md the well will begin to drop until a final angle of 50° is reached. The 50° angle will be held through the reservoir to TD. MP J- 22 will have a horizontal displacement of 3115'. 7. Cement The surface hole will be cemented to surface with Cold Set III Cement, a foamed 10# intermediate slurry followed by Class G, run from TD to 1000' TVD above the top of the Schrader Bluff. The 6-3/4 .... hole will be cemented in a single stage to bring cement 1000' TVD above the top of the Schrader Bluff Sands, and assure cement returns to surface. A back up port collar will be run approximately 200' below the permafrost the exact position determined from the caliper log. A detailed procedure for the foamed cement job is attached to this program including surface handling, schematics of the surface handling equipment, port collar operating procedure, pumping schedule, centrilizer program, etc. This program will be modified once the caliper log results are known. MP J-22 Well Plan PAGE 6 8 Jun 98 MP J-22 5-1/2 .... SURFACE CASING CEMENT PROGRAM - B.J. Alaska CASING SIZE: 5-1/2 .... CIRC. TEMP 80 deg F at 4695' TVDSS. Spacer 250bbls. Water 8.43 ppg. STAGE1 LEAD: TYPE Cold Set III PERMAFROST, Foamed (10# Intermediate) WEIGHT: Cold Set III 12.2ppg YIELD: 1.92ft3/Sk. Mix Water:10.53 gal/Sk. WEIGHT: Foamed 10.0ppg YIELD: 1.74ft3/Sk. Mix Water: 6.06 gal/Sk. APPROX #SACKS: 187 Cold Set III THICKENING TIME: Greater than 6 hrs at 50° F. 170 Foamed Greater than 4:.30 Hrs. ANNULAR VOLUME TOP OF TAIL CEMENT TO Port Collar AT 2200' MD +30% EXCESS. (Confirm From Caliper) STAGE1 TAIL CEMENT TYPE: PREMIUM 'G' ADDITIVES: APPROX #SACKS: FLUID LOSS: FI-33-.4%, CD-32- .3%, R-1-.1% FP-6L lghs. WEIGHT: 15.8 ppg YIELD:1.34 ft3/sx MIX WATER gal/sk 6.06 87 THICKENING TIME: Greater than 3.39 hrs at 50° F. 100-150 cc FREE WATER: 0 TAIL CEMENT FROM TD TO 1000 FEET TVD ABOVE SCHRADER BLUFF + 30% EXCESS + 80'md 5-1/2".", 15.5# capacity for float joints. EST TOC 3310' md (Confirm from Caliper) STAGE2 Contingency: ADDITIVES: WEIGHT: APPROX #SACKS: Cold Set III PERMAFROST (If Single Stage Unsuccessful) Retarder 12.0ppg 272 SACKS YIELD:2.17 ft3/sx MIX WATER: 11.63 gal/sk THICKENING TIME: Greater than 4 hrs at 50° F. ANNULAR VOLUME FROM STAGE COLLAR AT 2200' MD TO SURFACE+ 200% EXCESS. (Confirmed by Caliper) Note Excess is estimate only caliper will be used for final determination. DO NOT PUMP TOP JOB WITHOUT APPROVAL OF AOGCC AND DRILLING SUPERINTENDENT TOP JOB CEMENT TYPE: Permafrost Cold Set Set III NOTE: ADDITIVES: Retarder TOP JOB WILL BE PUMPED IF THERE ARE NO CEMENT RETURNS TO SURFACE OR THE CEMENT TOP FALLS BELOW SURFACE AFTER THE PUMPS ARE SHUT DOWN. WEIGHT: 12.2 ppg YIELD:1.92 ft3/sx MIX WATER: 10.53 gal/sk APPROX NO SACKS: 100 RECIPROCATE CASING STRING WHILE CEMENTING IF POSSIBLE/PRACTICAL MP J-22 Well Plan PAGE 7 8 Jun 98 I' I VICINITY MAP Ii I N.T.S. ~ I :1 I ~ · I _J ~ · !1 i I I I I · ~ · ~ I II 17 Icj I I 19 I § Ii I 21 I 7 ~1 SURVEYOR'S CERTIFICATE  I HEREBY CERTIFY ~AT i AM I MPJ-2 I PROPERLY REGISTERED AND LICENSED TO'PRACTICE LAND SUR~YINO IN ~ I ~E STA~ OF ALASKA AND THAT (%_ I, ~ ~[S PLAT REPRESENTS A SURLY MACE BY ME OR UNDER MY DIRECT I~ I SUPERVISION AND ~AT ALL 01BENS[ONS AND 0~ER 0ETAILS ARE I I CORRECT AS OF MAY 15, 1998. " I I J-2 SOUTH I I NOTES  1. DATE OF SURLY: MAY 15, lg98. I I ~ 2. REFERENCE FIELD BOOKS: ~ MP98-~3 (POS. 58-59), ~ LEGEND ;. ,L,sx, ST,~ Pt,,6 ~ AS-BUILT CONDUCTOR 5. PAD SCALE FACTOR IS ¢.9999¢31. 6. HORIZONTAL A ~RTICAL CON~OL I EX[ST[NO CONDUCTOR eASED ON d PAD ~LLS J-1 AND 7. ELEVATIONS ARE 8PX MILNE POINT OATUM LOCATED WITHIN PROTRACTED SEC. 28, T. 13 N., R. 1¢ E., UMIAT MERIDIAN, ALASKA [ WELL A.~,P, ' PLANT GEODETIC GEODETIC CELLAR S~CTIdN NO. COOROINATES COORDINATES POSITION(DMS) POS[TION(D.DD) BOX. ELEV. I OFFSETS MPJ-22 Y=6,~14,549.54 N= 789.62 ' 7~'27'~1.761'' 7e.~se4892' 34.9' ~2,~5~' FSL X= 552,~5~.9~- E= 1,e24.76 149'34'31.~1~"_1~9.57528~61' .3,~5' FEL~ .... ........ ~ F, R9berL~ o,*~ STO[L .......~ J~ o.~[: 5/19/98 , . ' ~: MILNE POINT UNIT d-PAD .............. co ouc o 9/98 I~SUg,0' F-gR~NFQR.VA~ION. , ' :SS,LO ...... -- ~LL MPJ-22 m WELL A.~,P, PLANT GEODETIC GEODETIC CELLAR SI~cTION NO. COOROINATES COORDINATES POSITION(DMS) POS[TION(D.OD) BOX. ELEV. OFFSETS MPJ-22 Y=6,014,54.9.54. N= 789.62 70'27'01.761" 70.~.504892' 34..9' 2,151' FSL X= 552,65.6.91 E= 1,024.76 149'34'31.010" 1¢9.57528061' 3,2._65' FEL FO'd £O0'ON 6T'O~ 86,6T AUN Shared Services Drilling ~'uest ma'~-.".._a.,?.,.,~,.~.~..v,l.c s's MPJ-22 (98-1) WP4 · SURFACE LOCATION PLOT DATE: 6/4/98 Horizontal Coordlnale,: 6014540.54 N, 552056.g1 E Created By: L~ RKB Elevation: 33.00 ft ~ (EST) 34.90 tt well (CSE) Coordinate System: NAD27 AlaO, a State Zofte 4, US Fool .Approved By: O Proposal Data for MPJ-22 (98-1) p4 verltcal Origin: Well Horlzontat Origin: Well Measurement Units: ft North Reference: True Norlh tO0.00 ' Dogleg severity: Degrees per 100ff Vertical Section Azimuth: 280.428' ! Vertical Section Dascrlp~ion~Nell Vertical Section Origin: 0,00 N,O.O0 E 6OO -- Meesured Incl. Azlm. Vertical Northlnge Eastlng$ Vertical Dogleg Depth Depth Section Rate I 1~00.00 0.00 0.000 0.4OO 0.00 0.00 rq 0.00 E 0.00 500.00 o.o(lo 0.400 500.00 0.00 N 0.00 E 0.130 0.000 ~ / 800.00 3.0(10 250,400 799.86 2.6't $ 7.40 W 6.80 1.000 [ 11300.00 6.0(30 250.400 999.22 7.90 .q 22.18 W 20.38 1.500 [ 1200.00 10.0(10 250.400 1197.24 17.2:3 8 48.39 W 44.48 2.0(10 ~ 1500.00 t'/.500 250.400 1488.43 4I.t4S 118.52W IO6.1'/ 2.500 I ~ 1726.60 24.297 250.400 1700.130 68.23 $ 191.62 W 1'/6.11 3.000 / 2055.75 24.297 250.400 2000.00 113.6'/.q 319.21 W 293.3'/ 0,000 t 2812 81 55.615 286.358 2580.03 76.57 S 782.66 W 755.87 [1200.00 4756195 55.615 286.358 367?.98 3?5.30 N 2322.13 W 2351.70 0.O00 '~ 200 -- '[ 5054.67 50.003 283.86~ 3857.90 437.29 N 2550,92 W 2587.93 2.000 ~ 5443.~0 50.~ 283.8~ 410,.~0 508.?0, 2840.~?w 2885~4 0.~ _e '~aOo . I~~. ,e~ Base Permafrost 1842.90 --13. k PROPOSAL TARGET SUMMARY ,I O~ ~400.00 T~met Uame: TVOSS TVOmm: wen.ed o,.t,: ~b,a C~rd~at,~: I lam 1~ ~'~: MPJ-22 (98-1) T1 37~0.00 3857.90 437.29N, 2~80.02 W 6014~9.00 N, 54~503.00 E I · 24o0 3000 ..... f-'- .... 3600 , ~ ~~ Top M Sand 3605.90 I ~3 ---' lllt)j.~; -l't '"~200.00 Top Schrader 38.57.90 II · srat~s. ~so~ ~ ..... _x~ ....... .t:O ~e.o~chrader 4107. 90 .~4200 - 5 1/2. Casing '~ ' ~ 5743.60 MD ~ 4300.74 TVD I I I I I 0 600 '1200. ~800 2400 3000 Scale: ~lnch = 600ft Section Azimuth: 280.428' (True North) Vertical Section D~ILLING Shared Services Drilling MPJ-22 (98-1) WP4 J DrillQuest' SURFACE LOCATION Ho~zont~l Coordinates: 6014549.54 N. S52056.91 E RK~ FJevatiea: 33.00 ft Rig (EST) 34.90 ff Well (CBE) 67.90 ff RKB - AMSL Coordinate System: NAD27 AJasY, aZo~eState4, usPlaneS'Foot PLOT DATE: 6/4~98 cr,ated By: _~~ Checked By: .- PROPOSAL TARGET SUMMARY Target Name: MPJ-22 (96-1) T1 'fVOSS 'rVDFU(B: Well'~ad Offsets: Global Coo~inata$: 3790.003857.90 437.29N, 2550.92 W6014969.00 N. 549503.00 E Proposal Data for MPJ-22 (98-1) p4 Ve~cal Origin: Well Ho~zontal Origin: Well Measurement Units:ft Nmlh Reference: True Norl~ Dogleg severity- Degrees per lOOff Vertical Section ~zimuth: 280.428° Vert~.,aJ Section DescdptJon~Nell Ve,'lJcal Section Oflgtn: 0.00 N.0.00 E Measured IncL Azim. Vertical Northlngs Easflng$ Ve~.al Dogleg 0.00 0.000 0.400 0.00 0.00 N 0.00 E 0.00 500.00 0.000 0.400 500.00 0.00 N 0.00 E 0.00 0.0CO 800.00 3.000 2.50.400 799.86 2.63 S 7.40 W 6.80 I.O(X) 1000.00 6.000 250.400 999.22 7.90 S 22.18 W 20.38 ! .500 1200.00 10.000 250.400 1197~A 1723 S 48.39 W 44.48 2_000 1500.00 17.500 250.400 1488.43. 41.14 S 11532W 106.17 2.500 1726.60 24.297 250.400 1700.00 68.23 S 191.62 W 176.11 3.000 2055.75 24.297 2.50.400 2000.00 113.67 S 319.21 W 293.37 0.000 2812.81 55.615 286358 2580.03 7637 S 782.66 W 755.87 5.000 4756.95 55.615 286.358 3677.98 375.30 N 232913 W 2351.70 0.000 5054.67 50.000 283.868 3857.90 437.29 N 2550.92 W 2587.93 2-000 5443.60 50.000 283.868 4107.90 508.70 N 2840.17 W 2885.34 0.000 5743.60 50.000 283.868 4300.74 563.78 N 3063.29 W 3114.74 0.0~0 500 Scale: linch = 50Oft Eastings .=9oo .729oo .:,90o .19oo .19oo - - 5 1/2" Casing [" ~'~ "~.0o 5743.60 MD ~ I~ _ ~22 rt I" i I '" I " I'" I -3000 -2500 -2000 -1500 -1000 -500 0 Scale: linch = 500ft Eastings Reference is True North 500 .1:: Sperry-Sun Drilling Services Proposal Report for MPJ-22 (98-1) - MPJ-22 (98-1) p4 Milne Point Unit Measured Depth (ft) Incl. 0.00 1 o0.0o 200.00 300.00 400.00 500.00 600.00 700.00 800.00 900.00 10oo.oo 11o0.o0 1200.00 13o0.oo 1400.00 1500.00 1600.00 1700.00 1726.60 1800.00 1883.39 1900.00 2000.00 2055.75 2100.00 2200.00 2300.00 2400.00 2500.00 2600.00 0.000 0.000 0.000 0.000 0.000 0.000 1.000 2.000 3.000 4.500 6.000 8.000 10.000 12.500 15.000 17.500 20.500 23.499 24.297 24.297 24.297 24.297 24,297 24.297 25.710 29.247 33.133 37.259 41.552 45.964 Azim. o.ooo o.ooo o.ooo o.ooo o.ooo o.ooo 250.400 250.400 250.400 250.400 250.400 250.400 250.400 250.400 250.400 250.400 250.400 250.400 250.400 250.400 250.400 250.400 250.400 250.400 254.429 262.108 268.196 273.105 277.149 280.554 Sub-Sea Depth (ft) -67.90 32.10 132.10 232.10 332.10 432.10 532.09 632.06 731.96 831.75 931.32 1030.57 1129.34 1227.41 1324.53 1420.53 1515.07 1607.78 1632.10 1699.00 1775.00 1790.14 1881.28 1932.10 1972.20 2060.93 2146.48 2228.20 2305.46 2377.68 Vertical Depth (ft) 0.00 100.00 200.00 300.00 400.00 500.00 599.99 699.96 799.86 899.65 999.22 1098.47 1197.24 1295.31 1392.43 1488.43 1582.97 1675.68 1700.00 1766.90 1842.90 1858.04 1949.18 2000.00 2040.10 2128.83 2214.38 2296.10 2373.36 2445.58 Local Coordinates Global Coordinates Dogleg Vertical Northings Eastings Northings Eastings Rate Section (ft) (ft) (ft) (ft) (°/~OOft) (ft) 0.00N 0.00 E 6014549.54N 552056.91 E 0.00 0.00 N 0.00 E 6014549.54N 552056.91 E 0.000 0.00 0.00N 0.00 E 6014549.54N 552056.91 E 0.000 0.00 0.00N 0.00 E 6014549.54N 552056.91 E 0.000 0.00 0.00N 0.00 E 6014549.54N 552056.91 E 0.000 0.00 0.00 N 0.00 E 6014549.54N 552056.91 E 0.000 0.00 0.29 $ 0.82W 6014549.24 N 552056.09 E 1.000 0.76 1.17 $ 3.29W 6014548.35 N 552053.63 E 1.000 3.02 2.63S 7.40W 6014546.85N 552049.53 E 1.000 6.80 4.83 S 13.56W 6014544.62 N 552043.39 E 1.500 12.46 7.90 S 22.18W 6014541.49 N 552034.79 E 1.500 20.38 11.99 $ 33.66W 6014537.32 N 552023.34E 2.000 30.93 17.23 S 48.39W 6014531.97 N 552008.64E 2.000 44.48 23.78 S 66.77W 6014525.30 N 551990.31E 2.500 61.37 31.75 S 89.16W 6014517.17 N 551967.97 E 2.500 81.94 41.14 S 115.52W 6014507.60 N 551941.68 E 2.500 106.17 52.05 $ 146.19W 6014496.47N 551911.09 E 3.000 134.35 64.62 S 181.47W 6014483.65 N 551875.89 E 3.000 166.78 68.23 S 191.62W 6014479.97 N 551865.77E 3.000 176.11 78.37 S 220.08W 6014469.64N 551837.39 E 0.000 202.26 89.88 S 252.40W 6014457.90N 551805.15 E 0.000 231.96 92.17 S 258.84W 6014455.57N 551798.72 E 0.000 237.88 105.97 S 297.60W 6014441.49 N 551760.06E 0.000 273.50 1~3.67 S 319.21W 6014433.65 N 551738.50 E 0.000 293.37 119.30 S 337.04W 6014427.89 N 551720.72 E 5.000 309.87 · 128.48S 382.16W 6014418.39 N 551675.66 E 5.000 352.59 132.70 S 433.70W 6014413.82 N 551624.15 E 5.000 402.52 131.92 S 491.28W 6014414.19 N 551566.56 E 5.000 459.29 126.15 S 554.45W 6014419.52 N 551503.35 E 5.000 522.46 115.43S 622.74W 6014429.77N 551434.99 E 5.000 591.56 Comment Base Permafrost · Alaska State Plane Zone 4 Milne Point J Pad Con#nued... 5 June, 1998 - 9:14 - 1 - DrillQuest Sperry-Sun Drilling Services Proposal Report for MPJ-22 (98-1) - MPJ-22 (98-1) p4 Milne Point Unit Measured Depth (ft) Incl. 2700.00 2800.00 2812.81 2900.00 3000.00 31o0.0o 3200.00 3500.00 3600.00 3700.00 3800.00 3900.00 4000.00 41oo.oo 4200.00 4214.97 4300.00 4500.00 4600.0o 4629.31 4700.00 4756.95 4300.00 4900.00 5000.00 5054.67 51 oo.oo 5o.463 55.026 55.615 55.615 55.615 55.615 55.615 55.615 55.615 55.615 55.615 55.615 55.615 55.615 55.615 55.615 55.615 55.615 55.615 55.615 55.615 55.615 55.615 55.615 55.615 54.800 52.91o 51 .o27 50.000 50.000 Azim. 283.482 286.051 286.358 286.358 286.358 286.358 286.358 286.358 286.358 286.358 286.358 286.358 286.358 286.358 286.358 286.358 286.358 286.358 286.358 286.358 286.358 286.358 286.358 286.358 286.358 286.020 285.208 284.354 283.868 283.868 Sub-Sea Depth (ft) 2444.31 2504.84 2512.13 2561.37 2617.84 2674.32 2730.79 2787.27 2843.74 2900.22 2956.69 3013.17 3069.64 3126.12 3182.60 3239.07 3295.55 3304.00 3352.02 3408.50 3464.97 3521.45 3538.00 3577.92 3610.08 3634.65 3693.63 3755.24 3790.00 3819.14 Vertical Depth (ft) 2512.21 2572.74 2580.03 2629.27 2685.74 2742.22 2798.69 2855.17 2911.64 2968.12 3024.59 3081.07 3137.54 3194.02 3250.50 3306.97 3363.45 3371.90 3419.92 3476.40 3532.87 3589.35 3605.90 3645.82 3677.98 3702.55 3761.53 3823.14 3857.90 3887.04 Local Coordinates Global Coordinates Dogleg Vertical Northings Eastings Northings Eastings Rate Section (fi) (fi) (fi) (fi) (°/100fi) (fi) 99.84 S 695.62 W 6014444.84 N 551362.00 E 5.000 666.06 79.51 S 772.54 W 6014464.63 N 551284.94 E 5.000 745.39 76.57 S 782.66 W 6014467.50 N 551274.81 E 5.000 755.87 56.31 S 851.70 W 6014487.28 N 551205.62 E 0.000 827.44 33.06 S 930.88 W 6014509.97 N 551126.28 E 0.000 909.52 9.82 S 1010.07 W 6014.532.66 N 551046.93 E 0.000 991.61 13.42 N 1089.26 W 6014555.35 N 550967.59 E 0.000 1073.69 36.66 N 1168.44 W 6014578.04 N 550888.24 E 0.000 1155.78 59.91 N 1247.63 W 6014600.73 N 550808.90 E 0.000 1237.86 83.15 N 1326.81 W 6014623.42 N 550729.55 E 0.000 1319.95 106.39 N 1406.00 W 6014646.11 N 550650.21 E 0.000 1402.03 129.64 N 1485.18 W 6014668.80 N 550570.86 E 0.000 1484.11 152.88 N 1564.37 W 6014691.49 N 550491.51 E 0.000 1566.20 176.12 N 1643.55 W 6014714.18 N 550412.17 E 0.000 1648.28 199.37 N 1722.74 W 6014736.87 N 550332.82 E 0.000 1730.37 222.61 N 1801.92 W 6014759.56 N 550253.48 E 0.000 1812.45 245.85 N 1881.11 W 6014782.25 N 550174.13 E 0.000 1894.54 249.33 N 1892.96 W 6014785.64 N 550162.25 E 0.000 1906.82 269.09 N 1960.29 W 6014804.93 N 550094.79 E 0.000 1976.62 292.34 N 2039.48 W 6014827.62 N 550015.44 E 0.000 2058.70 315.58 N 2118.66 W 6014850.31 N 549936.09 E 0.000 2140.79 338.82 N 2197.85 W 6014873.00 N 549856.75 E 0.000 2222.87 ' 345.64 N 2221.06 W 6014879.65 N 549833.49 E 0.000 2246.93 362.07 N 2277.03 W 6014895.69 N 549777.40 E 0.000 2304.96 375.30 N 2322.13 W 6014908.61 N 549732.22 E 0.000 2351.70 385.16 N 2356.08 W 6014918.23 N 549698.20 E 2.00-0 2386.88 406.90 N 2433.85 W 6014939.43 I',1' 549620.28 E 2.000 2467.30 427.00 N 2510.00 W 6014959.00 N 549543.99 E 2.000 2545.83 437.29 N 2550.92 W 6014969.00 N 549503.00 E 2.000 2587.93 445.61 N 2584.63 W 6014977.09 N 549469.23 E 0.000 2622.60 Alaska State Plane Zone 4 Milne Point J Pad Comment Top Ugnu Top M Sand Top Schrader arget: MPJ-22 T1,200.00 Radius., Geological Continual... 5 June,. 1998 - 9:14 - 2 - DrillQuest Sperry-Sun Drilling Services Proposal Report for MPJ-22 (98-1) - MPJ-22 (98-1) p4 Sub-Sea Vertical Depth Depth (ft) (ft) Local Coordinates Global Coordinates Dogleg Vertical Northings Eastings Northings Eastings Rate Section (ft) (ft) (ft) (ft) (°/lOOft) (ft) .868 3883.42 3951.32 '.868 3947.70 4015.60 .868 4011.98 4079.88 .868 4040.00 4107.90 .868 4076.25 4144.15 · 868 4140.53 4208.43 .868 4204.81 4272.71 .868 4232.84 4300.74 463.97 N 2659.00 W 6014994.93 N 549394.73 E 0.000 2699.06 482.33 N 2733.38 W 6015012.77 N 549320.23 E 0.000 2775.53 500.70 N 2807.75 W 6015030.61 N 549245.73 E 0.000 2852.00 508.70 N 2840.17 W 6015038.39 N 549213.25 E 0.000 2885.34 519.06 N 2882.12 W 6015048.45 N 549171.24 E 0.000 2928.46 537.42 N 2956.49 W 6015066.29 N 549096.74 E 0.000 3004.93 555.78 N 3030.86 W 6015084.13 N 549022.24 E 0.000 3081.40 563.78 N 3063.29 W · 6015091.91 N 548989.76 E 0.000 3114.74 :wise stated. Directions and coordinates are relative to True North. ~ Well. Northings and Eastings are relative to Well. 3tees per 100ft. land calculated along an Azimuth of 280.428° (True). Jre type calculations, at a Measured Depth of 5743.60ft., ~nt is 3114.74ft., in the Direction of 280.428° (True). Comment Base Schrader 5 1/2" Casing Alaska State Plane Zone 4 Milne Point J Pad - 3- DrillCluest H 13 71 6 6 ~. 04/24/?8 00137,66 VENDOR . ,L~,uKAa ~ 14O0 DATE INVOICE / CREDIT MEMO DESCRIPTION GROSS DISCOUNT NET 042298 CKO42298A i00. O0 lO0. O0 HANDL[NO INST: S/H KATHY CAMPOA~OR X 5122 , · WELL PERMIT CHECKLIST FIELD & POOL ,~.~_. ~',/~0 COMPANY _/~/0 WELL NAME /~/'~ ~-~ ,~ 2._ INIT CLASS _~¢'...,~/' /~<~// GEOL AREA PROGRAM: exp [] dev/~redrll [] serv [] wellbore seg [] ann. disposal para req II ~ O UNIT# //~ 2. ~ ON/OFF SHORE O/"~) ADMINISTRATION 1. Permit fee attached ....................... 2. Lease number appropriate ................... 3. Unique well name and number .................. 4. Well located in a defined pool .................. 5. Well located proper distance from drilling unit boundary .... 6. Well located proper distance from other wells .......... 7. Sufficient acreage available in drilling unit ............ 8. If deviated, is wellbore plat included ............... 9. Operator only affected pady ................... 10. Operator has appropriate bond in force ............. 11. Permit can be issued without conservation order ........ 12. Permit can be issued without administrative approval ...... 13. Can permit be approved before 15-day wait ........... ENGINEERING APPR DATE N N N N N N N N N N N N N 14. Conductor string provided ................... ~ N 15. Surface casing protects all known USDWs ........... ~ N 16. CMT vol adequate to circulate on conductor & surf csg ..... N 17. CMT vol adequate to tie-in long string to surf csg ........ 18. CMT will cover all known productive horizons .......... (~ N 19. Casing designs adequate for C, T, B & permafrost ....... ~ N 20. Adequate tankage or reserve pit ................. N 21. If a re-drill, has a 10-403 for abandonment been approved... 22. Adequate wellbore separation proposed ............. ~ N 23. If diverter required, does it meet regulations .......... N 24. Drilling fluid program schematic & equip list adequate ..... ,Y N _ 25. BOPEs, do they meet regulation ................ 26. BOPE press rating appropriate; test to ~Od)O psig. 27. Choke manifold complies w/APl RP-53 (May 84) ........ 28. Work will occur without operation shutdown ........... Y~__..) GEOLOGY 29. Is presence of H2S gas probable ................. 30. Permit can be issued w/o hydrogen sulfide measures ..... Y N/Y N 31. Data presented on potential overpressure zones ....... Y/,,KI .,¢ ,~ 32. Seismic analysis of shallow gas zones ............. ~y NN /[/~,,. , 33. Seabed condition survey (if off-shore) ............. 34. Con. tact.nam, e/phone forweekly progress reports ....... / Y N lexploratory only] ANNULAR DISPOSAL 35. APPR DATE With proper cementing records, this plan (A) will contain waste in a suitable receiving zone; ....... Y N (B) will not contaminate freshwater; or cause drilling waste... Y N to surface; (C) will not impair mechanical integrity of the well used for disposal; Y N (D) will not damage producing formation or impair recovery from a Y N pool; and (E) will not circumvent 20 AAC 25.252 or 20 AAC 25.412. Y N GEOLOGY: ENGINEERING: UlC/Annular WM JDH COMMISSION: DWJ RNC co _C~ ~'/, Comments/Instructions: M:chel~list rev 05/29/98 dlf C :\IT~SOf fico\wordiarl\dial w,~\(fl ~(~(fldi?,l Well History File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history_ file. To improve the readability of the Well History file and to simplify finding information, information of this nature is accumulated at the end of the file under APPENDIX. No special effort has been made to chronologically organize this category of information. Sperry-Sun Drillir- Services LIS Scan Uta~/.ty Tue Nov 10 10:29:23 1998 Reel Header Service name ............. LISTPE Date ..................... 98/11/10 Origin ................... STS Reel Name ................ UNKNOWN Continuation Number ...... 01 Previous Reel Name ....... UNKNOWN Comments ................. STS LIS Writing Library. Scientific Technical Services Tape Header Service name ............. LISTPE Date ..................... 98/11/10 Origin ................... STS Tape Name ................ UNKNOWN Continuation Number ...... 01 Previous Tape Name ....... UNKNOWN Comments ................. STS LIS Writing Library. Scientific Technical Services Physical EOF Comment Record TAPE HEADER MILNE POINT MWD/MAD LOGS WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: JOB DATA JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL: FSL: FEL: FWL: ELEVATION (FT FROM MSL 0) KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: WELL CASING RECORD 1ST STRING MPJ-22 5002922897 BP EXPLOP~ATION (ALASKA), INC. SPERRY-SUN DRILLING SERVICES 10-NOV-98 MWD RUN 2 AK-MM-80285 M. HANIK P. LOCKWOOD 28 13N 10E 2151 3265 .00 68.10 34.90 OPEN HOLE CASING DRILLERS BIT SIZE (IN) SIZE (IN) DEPTH (FT) . NOV 18 1998 AJasK8 (~.i! & Gss 'L;on.~..; ;'.- ..... 2ND.STRING 3RD STRING PRODUCTION STRING REMARKS: .... 13.375 152.0 6.750 5760.0 1. ALL DEPTHS ARE MEASURED DEPTHS (MD) UNLESS OTHERWISE NOTED 2. DEPTH SHIFTING/CORRECTION OF MWD DATA IS WAIVED AS PER THE E-MAIL MESSAGE FROM D. DOUGLAS FOR KATIE NITZBERG OF BP EXPLORATION (ALASKA), INC. ON 10/27/98. 3. RUN 1 IS DIRECTIONAL ONLY AND IS NOT PRESENTED. 4. RUN 2 IS DIRECTIONAL, DUAL GAMMA R_AY (DGR) UTILIZING GEIGER-MUELLER TUBE DETECTORS, AND ELECTROMAGNETIC WAVE RESISTIVITY PHASE-4 (EWR4) . 5. MWD RUNS 1 AND 2 REPRESENT MPJ-22 WITH API# 50-029-22897. THIS WELL REACHED A TOTAL DEPTH OF 5760'MD, 4299'TVD. SGRC = SMOOTHED GAMMA RAY COMBINED. SROP = SMOOTHED RATE OF PENETRATION. SEXP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (EXTRA SHALLOW SPACING). SESP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (SHALLOW SPACING). SEMP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (MEDIUM SPACING). SEDP = SMOOTHED PHASE SHIFT-DERIVED RESISTIVITY (DEEP SPACING). SFXE = SMOOTHED FORMATION EXPOSURE TIME - RESISTIVITY SENSOR. SLIDE = MUD MOTOR DRILLING. $ File Header Service name ............. STSLIB.001 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/11/10 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.000 Comment Record FILE HEADER FILE NUMBER: 1 EDITED MERGED MWD Depth shifted and clipped curves; all bit runs merged. DEPTH INCREMENT: .5000 FILE SUMMARY PBU TOOL CODE START DEPTH STOP DEPTH ROP 2700 0 5759.5 GR 2891 0 5709.5 FET 2898 5 5716.5 RPD 2898 5 5716.5 RPM 2898 5 5716.5 RPS 2898 5 5716.5 RPX 2898 5 5716.5 $ BASELINE CURVE FOR SHIFTS: CURVE SHIFT DATA (MEASURED DEPTH~ BASELINE DEPTH $ MERGED DATA SOURCE PBU TOOL CODE MWD $ REMARKS: k. IVALENT UNSHIFTED DEPTH ......... BIT RUN NO MERGE TOP MERGE BASE 2 2941.0 5760.0 MERGED MAIN PASS. $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .liN Max frames per record ............. Undefined At, sent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 Name Service Order Units Size Nsam DEPT FT 4 1 ROP MWD FT/H 4 1 GR MWD API 4 1 RPM MWD OHMM 4 1 RPX MWD OHMM 4 1 RPS MWD OHMM 4 1 RPD MWD OHMM 4 1 FET MWD HOUR 4 1 Rep Code Offset Channel 68 0 1 68 4 2 68 8 3 68 12 4 68 16 5 68 20 6 68 24 7 68 28 8 Name Min Max Mean DEPT 2700 5759.5 4229.75 ROP 10.2326 1732.55 205.496 GR 18.4744 345.324 70.2138 RPM 1.2398 2000 12.3466 RPX 1.3958 78.1089 10.4819 RPS 0.797 407.105 11.6796 RPD 1.0711 503.955 12.3808 FET 0.0774 6.3371 0.747394 First Last Nsam Reading Reading 6120 2700 5759.5 6120 2700 5759.5 5638 2891 5709.5 5637 2898.5 5716.5 5637 2898.5 5716.5 5637 2898.5 5716.5 5637 2898.5 5716.5 5637 2898.5 5716.5 First Reading For Entire File .......... 2700 Last Reading For Entire File ........... 5759.5 File Trailer Service name ............. STSLIB.001 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/11/10 Maximum Physical Record..65535 File Type ................ LO Next File Name ........... STSLIB.002 Physical EOF File Header Service name ............. STSLIB.002 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/11/10 Maximum Physical Record..65535 File Type ................ LO Previous File Name ....... STSLIB.001 Comment Record FILE HEADER FILE NLIMBER: 2 R3~W MWD Curves and log header data for each bit run in separate files. BIT RUN NUMBER: 2 DEPTH INCREMENT: .5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH ROP 2700.0 5759.5 GR 2891.0 5709.5 FET 2898.5 5716.5 RPM 2898.5 5716.5 RPM 2898.5 5716.5 RPS 2898.5 5716.5 RPX 2898.5 5716.5 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : BIT ROTATING SPEED (RPM) : HOLE INCLINATION (DEG MINIMUM ANGLE: MAXIMUM ANGLE: TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE DGR DUAL GAMMA P~AY EWR4 ELECTROMAG. RESIS. 4 $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLER'S CASING DEPTH (FT) : BOREHOLE CONDITIONS MUD TYPE: MUD DENSITY (LB/G): MUD VISCOSITY (S) : MUD PH: MUD CHLORIDES (PPM) : 18-JUL-98 ISC 5.07 DEPII(2.22A) MEMORY 5760.0 2941.0 5760.0 .9 60.3 TOOL NUMBER P1043GR4 P1043GR4 6.750 6.8 DUOVI S / KLAGARD 9.30 60.0 8.0 7000 FLUID LOSS (C3) : RESISTIVITY (OHMM) AT TEk .~ATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): MUD AT MAX CIRCULATING TERMPERATURE: MUD FILTRATE AT MT: MUD CAKE AT MT: NEUTRON TOOL MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): TOOL STANDOFF (IN): EWR FREQUENCY (HZ) : REMARKS: $ Data Format Specification Record Data Record Type .................. 0 Data Specification Block Type ..... 0 Logging Direction ................. Down Optical log depth units ........... Feet Data Reference Point .............. Undefined Frame Spacing ..................... 60 .lin Max frames per record ............. Undefined Absent value ...................... -999.25 Depth Units ....................... Datum Specification Block sub-type...0 6.6 .400 .322 .400 .360 .5 Name Service Order Units Size Nsam Rep Code Offset Channel DEPT FT 4 1 68 0 1 ROP MWD 2 FT/H 4 1 68 4 2 GR MWD 2 API 4 1 68 8 3 RPX MWD 2 OHMM 4 1 68 12 4 RPS MWD 2 OHMM 4 1 68 16 5 RPM MWD 2 OHMM 4 1 68 20 6 RPD MWD 2 OHMM 4 1 68 24 7 FET MWD 2 HOUR 4 1 68 28 8 35.0 First Name Min Max Mean Nsam Reading DEPT 2700 5759.5 4229.75 6120 2700 ROP 10.2326 1732.55 205.496 6120 2700 GR 18.4744 345.324 70.2138 5638 2891 RPX 1.3958 78.1089 10.4819 5637 2898.5 RPS 0.797 407.105 11.6796 5637 2898.5 RPM 1.2398 2000 12.3466 5637 2898.5 RPD 1.0711 503.955 12.3808 5637 2898.5 FET 0.0774 6.3371 0.747394 5637 2898.5 Last Reading 5759.5 5759.5 5709.5 5716.5 5716.5 5716.5 5716.5 5716.5 First Reading For Entire File .......... 2700 Last Reading For Entire File ........... 5759.5 File Trailer Service name ............. STSLIB.002 Service Sub Level Name... Version Number ........... 1.0.0 Date of Generation ....... 98/]~/10 Maximum Physical Record..655~ File Type ................ LO Next File Name ........... STSLIB.003 Physical EOF Tape Trailer Service name ............. LISTPE Date ..................... 98/11/10 Origin ................... STS Tape Name ................ UNKNOWN Continuation Number ...... 01 Next Tape Name ........... UNKNOWN Comments ................. STS LIS Writing Library. Reel Trailer Service name ............. LISTPE Date ..................... 98/11/10 Origin ................... STS Reel Name ................ UNK/qOWN Continuation Number ...... 01 Next Reel Name ........... UNKlqOWN Comments ................. STS LIS Writing Library. Scientific Scientific Technical Technical Services Services Physical EOF Physical EOF End Of LIS File