Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
HOME
EVENTS
DATA
Data List
Drilling
Production
Orders
Data Miner
Document Search
REPORTS
Reports and Charts
Pool Statistics
FORMS
LINKS
Links
Test Notification
Data Requests
Regulations
Industry Guidance Bulletins
How to Apply
ABOUT US
History
Staff
HELP
Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
195-123
ALASKA OIL AND GAS CONSERVATION COPI~ISSION TONY KNOWLES, GOVERNOR 3001 PORCUPINE DRIVE ANCHORAGE. ALASKA 99501-3192 PHONE: (907) 27%1433 FAX: (907) 276-7542 July 28, 2000 John Barnes, Regional Mgr. Marathon Oil Company P O Box 196168 Anchorage, AK 99519-6168 Dear Mr. Barnes: A recent review of our well history database indicates that Marathon Oil Company is the Operator of three abandoned wells that have not received Commission approval of final "location clearance" as required by 20 AAC 25.170 or 20 AAC 25.172. The attached list indicates that the three wells are "ready for inspection'' and provides additional information about the wells. Please contact Blair Wondzell at (907) 793-1226 within 30 days to arrange for Commission inspection of the location condition. Daniel T. Seamount, Jr. Commissioner Attachment CC: Brock Riddle - Alaska Region Landman Blair Wondzell L-ak-opers-loc-clear PERMIT LOC CLEAR API NUMBER 166-060 4-RDY-FOR-INSP 133-10'042-00 195-123 4-RDY-FOR-INSP 133-20467-00 161-002 4-RDY-FOR-INSP 133-10094-01 WELL NAME BEAVER CKUNIT COREACREEK KENAI UNIT 1 FED 1 44-18 WELL STATUS P&A P&A P&A STATUS DATE ~/15/19~7 7/30/1997 12/01/1986 TALLY OPERATOR MARATHON OIL MARATHON OIL MARATHON OIL ** THIS LIST EXCLUDES WELLS WITH LEASE FED-NPRA ** LUGGINg, & LOCATION CLMA~ ~NCE REPORT State of Alaska · ALASKA 0IL & GAS CONSERVATION COM~/ISSION Me_mcrand'~m To File: Abnd Date Comp! eted Note casing size, wt, depth, cmo vol, & procedure. Review the well file, and' comment on piuq~ing, well head status, and location clearance - provide loc. clear, code. ~ , -- / ) '' ,, / Location Clear~ce: ~~' ~O Code Alaska( ~ion Domestic Production Marathon Oil Company P.O. Box 196168 Anchorage, AK 99519-6168 Telephone 907/561-5311 August 1, 1997 OONFIDENTIAL Blair Wondzell Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501-3192 Dear Mr. Wondzell: Enclosed in triplicate is the AOGCC Form 407, for the Corea Creek Federal ~1 plug and abandonment. Also enclosed is an operation summary report, wellbore diagram, and pictures taken on location. If you have any questions, please contact me at 564-6315. Sincerely, Michael R. Olson Production Engineer cc: CEF ORIGINAL A subsidiary of USX Corporation Environmentally aware for the long run. STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1. Status of Well o Ll--I GASr--I 2. Name of Operator SUSPENDEDr~ ABANDONED~-~ SERVICE~---] MARATHON OIL COMPANY 3. Address P. O. Box 196168, Anchorage, AK 99519-6168 4. Location of Well at Surface 1567' FSL, 1573' FEL, Sec. 12, T1N, R13W, S.M. At top of Producing Interval At Total Depth 1694' FNL, 2030' FWL, Sec. 12, T1 N, R13W, S.M. @ 9052' tvd ~. Elevation in feet (indicate KB, DF, etc.) 16. Lease Designation and Serial No. 32.2' RKB I A-024399 2/27/96 4/2/96 - 9738' md 7/30/97 - Abandoned ~ N/A 7. Total Depth (MD+TVD) 18. Plug Back Depth (MD+TVD) 19. Directional S~.~/ 120. Depth where SSSV set 9738' md/9052' tvd Surface Yes~---]No I I N/A feet MD 12. Type Electric or Other Logs Run Classification of Service Well 7. Perm?~ber. __ /A"~_ 8. APl Number 50-133-20467 9. Unit or Lease Name Corea Creek Federal 0. Well Number Corea Creek Federal #1 1. Field and Pool Wildcat/Tyonek if offshore I16. No. of Completions feet MSLI Single 21. Thickness of Permafrost N/A !3. CASING, LINER AND CEMENTING RECORD HOLE SIZE CEMENTING RECORD AMOUNT PULLED DRIVEN 1' 17-1/2" 280 SX 2' I ;ASING SIZEIWT. PER FT. 20" I 133# 13-3/8" I 61 # 9-5/8" I 43# 7" I 29126# I SETTING DEPTH MD GRADE ITOP BOTTOM K-55 327' L-80 2563' P-110IN-80 9688' :4. Perforations open to Production (MD+TVD of Top and Bottom and interval, size and number) There are no open perfs. )ate First Production )ate of Test 12-1/4" 8-1/2" 870 SX 1200 SX 25. TUBING RECORD SIZE 3-1/2" 5317' DEPTH SET (MD) 5484' PACKER SET (MD) 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. DEPTH INTERVAL (MD) IAMOUNT & KIND OF MATERIAL USED I PRODUCTION TEST IMethod of Operation (Flowing, gas lift, etc.) Hours Tested ~low Tubing Casing Pressure 'mss. :8. CALCULATED 24-HOUR RATE GAS-MCF WATER-BBL GAS-MCF WATER-BBL CORE DATA ICHOKE SIZE IGAS-OIL RATIO OIL GRAVITY-APl (corr) trief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips. )rm 10-407 er. 7-1-80 1997 - · Submit in Triplicate CONTINUED ON REVERSE SIDE 29. 30. -- GEOLOGIC MARKERS FORMATION TESTS -- Include interval tested, pressure data, all fluids recovered NAME MEAS. DEPTH TRUE VERT. DEPTH and gravity, GOR, and time of each phase. __ 31. LIST OF A//ACHMENTS Wellbore Diagram, Operation Summary Report 32. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed .~~.~'~ '.~--~__-~~ Title Production En~lineer Date August 1 1997 INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Item 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.) Item 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-in, Other- explain. Form 10-407 H:\EXCEL\NRSFORMS\AOGCOMPL.XLW OPEP. ATION S~Y REPORT: POST RIG WELL: (20REA (_'.REEK FED #1 L{~i'D. ATE~i.i%iii!i~'"i~:R~T{'iii{ <!J:<!~D~.PTH'<]i/ !{:iMUD'WT..~ DAILy/OPERATIONS SUMMARY 7/22/97 5674' Stage equipment and partially RU Dowell. Check pressures: 9-5/8" x 13-3/8" 0 psig, 7" x 13-3/8" 0 psig, 3-1/2" x 7" 0 psig, 3-1/2" tubing 50 psig. Hauled fresh to location. 7/23/97 5674' RU Cameron and pull 3" Type H back pressure valve. WHP = 125 psig. Tubing bled to 0 psig in 10 minutes. 7/24/97 2300' RU Dowell. PT 9-5/8" x 13-3/8" to 750 psig. PT 7" x 9-5/8" to 510 psig. PT 3-1/2" tubing to 1450 psig. Good tests. RD. RU APRS and perf 2500-2502' w/ 2" GOEX glass strips. Guns did not fire. Rearm guns and perf 2502-2504' Guns fired. RD. RU Dowell al%d establish injection down tubing and up 3-1/2" X 7" Good returns. Could no~ establish returns up 7" x 9-5/8" annulus. MU 12.4 bbls cement. Pump cement down tubing. Placed 200' cement in 3-1/2" x 7" an~ulus. Pumped 200' cement into 7" x 9-5/8" annulus (5.4 bbls). Left 200' cement in tubing from 2300 - 2500' SI pumps and pressure stabilized at 600 psig. SDFN and WOC. 7/25/97 0 RU Dowell. PT 3-1/2" tubing to 1580 psig. PT 3-1/2" x 7" to 1610 psig. PT 7" x 9-5/8" to 1000 psig. Good tests. RD. RU AERS and perf 235-238' w/ 2" GOES glass strips. Guns fired. RD. RU Dowell and establish injection down tubing and up 3-1/2" x 7" and 7" x 9-5/8" annulus. MU 14 bbls cement. Circ. ulated cement down ,J-l/2" tubing and up 3-1/2" x 9-5/8" and 7" x 9-5/8" annulus. Left 200' cement in all 3 strings. C, leanup and RD. WOC. 7/30/97 0 Check wellhead pressure - all strings were 0 psig. RU sawsal and attempt to cold cut casing strings. Minimal progress. RD. RU APC cutting torch and cut 5 strings of pipe below casing hangers. Mud between 13-3/8" x 20", water between 9-5/8" x 13-3/8", cement between 7" x 9-5/8", cement between 3-1/2" x 7", cen'~ent i~ 3-1/2" tubing. Tagged cement in 9-5/8" x 13-3/8" 5' 5" below tilt. Added 3/4 sack Portland cement and mixed. Dress up 20" and weld on 1/~" x 20" marker plate. Description on marker plate: Marathon Oil Company, API ~ 50-133-20467, Eermit below surface gravel pad. Top of gravel is approximately the same e.levatior~ as the original ground level. Secured grating over cellar and cleaned up area. State Inspector Bobby Foster witnessed P/A. G['S coordinates: N 60 degrees 11.295 miriLltes, W 151 degrees 27.186 minutes. Corea Creek #1 Structural Casing (33.0-111.0, OD:20.000, Wt:133.00) Surface Casing (33.0-327.0, OD:13.375, Wt:61.00) Intermediate Casing (33.0-2563.0, OD:9.625, Wt:43.00) Productien Casing (33.0-7770.0, 0[):7.000, Wi:26.00) Cement Plug (33.0-238.0, OD:6.184) Per'rs (235-238) Cement Plug (2300.0-2504.0, OD:6.184) Peris (2502-2504) 3-1/2" Tubing (0-5483.4, OD:3.500, ID:2.992) Cement Plug (5674.0-6115.0, OD:6.276) Core (5825.0-5885.0) Perfs (5860.0-5890.0) Fill (6115.0-6470.0, OD:6.276) Perfs (6620.0-6650.0) Cement Plug (6470.0-6907.0, OD:6.276) Cement Plug (6894.0-7170.0, OD:6.276) Peris (7095.0-7115.0) Bridge Plug (7170.0-7175.0, OD:6.276) Core (8155.0-8215.0) Production Casing (7770.0-9688.0, OD:7.000, Wt:29.00) Cement Plug (8644.0-8844.0, OD:6.184) Sand Plug (8833.0-9524.0, OD:6.184) Peris (9086.0-9101,0) Peris (9105.0-9175.0) Peris (9320.0-9350.0) Cement Retainer (9571.0-9575.0, OD:6.184) APl 50-133-20467 8/1/97 MEMORANDUM t, State of Alaska Alaska Oil and Gas Conservation Commission TO: f~.---- David J o_h nstq). ,~?r~ Chairman ..~.~.~ DATE: July 30, 1997 THRU: FROM: Blair Wondzell, P. I. Supervisor Bobby Foste~~ Petroleum InsiS'ector FILE NO: SUBJECT: Y991G4EE.doc Surface Cement Plug Marathon Oil Company Corea Creek Federal # 1 PTD # 95-0123 Sec. 12,T1N,R13W- S.M. Wednesday, July 30,1997: I traveled this date to Marathon's exploratory well Corea Creek Federal # 1 and witnessed the cutting off of the production tree. After a failed attempt to cut the casing off with a power saw a welder was called in and the casing was cut off 3' below ground level with a torch. The tree was removed and there was cement at surface in all of the casing annuluses and tubing except the 7" X 9.625". A piece of pipe was used to find the top of cement at 5.5'. Cement was then used to fill this void. I told Mike Olsen, Marathon PE, to P & A marker plate on top of the casing and back fill the cellar. I also requested that the AOGCC be furnished with pictures of the plate after being welded on, the cellar filled, and a general view of the entire location after all equipment had been removed and Mike said he would give these pictures to Blair Wondzell. All of the cement plugs as seen on the attached schematic had been placed before I arrived on location. Mike said they had got good returns on all plugs and after I looked in the return tank I would agree since there was about 6 to 8" of cement in the bottom of the tank. Summary: I witnessed the cement at surface on all casing and tubing strings on the final P & A of Marathon's exploratory well Corea Creek Federal # 1. This location needs a final clean up inspection. Attachment: Marathon wellbore schematic Corea Creek #1: Structural Casing (0.0-111.0, OD:20.000, Wt:133.00) Surface Casing (0.0-327.0, OD:13.375, Wt:61.00) Intermediate Casing (0.0-2563.0, OD:9.625, Wt:43.00) Production Casing (0.0-7770.0, OD:7.000, Wt:26.00) Proposed Cement Plug (33.0-204.0, OD:6.184) Proposed Perfs (200.0-204.0) Proposed P~an Proposed Cement Plug (2300.0-2504.0, OD:6.184) Proposed Perfs (2500-2504) 3-1/2" Tubing (0-5483.4, OD:3.500, ID:2.992) Cement Plug (5674.0-6115.0, OD:6.276) Perfs (5860.0-5890.0) Fill (6115.0-6470.0, OD:6.276) Perfs (6620.0-6650.0) Cement Plug (6470.0-6907.0, OD:6.276) Cement Plug (6894.0-7170.0, OD:6.276) Perfs (7095.0-7115.0) Bridge Plug (7170.0-7175.0, OD:6.276) Production Casing (7770.0-9688.0, OD:7.000, Wt:29.00) Cement Plug (8644.0-8844.0, OD:6.184) Sand Plug (8633.0-9524.0, OD:6.184) Perfs (9086.0-9101.0) Perfs (9105.0-9175.0) Perfs (9320.0-9350.0) Cement Retainer (9571.0-9575.0, OD:6.184) APl 50-133-20467 4/8/97 Alaska'h~gion Domestic Production Marathon Oil Company P.O. Box 196168 Anchorage, AK 99519-6168 Telephone 907/561-5311 June 4,1997 LETTER OF TRANSMITTAL Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501-3192 Attn: Lori Taylor The following logs are enclosed: Description Array Induction/GR Corea Creek Federal #1 Run #2 April 3, 1996 Dipole Sonic Imager/GR Corea Creek Federal # 1 Run #2 April 3, 1996 Litho- Density/Neutron Corea Creek Federal # 1 Run #2 April 3, 1996 Natural Gamma Ray Spectrometry Log Corea Creek Federal #1 Run #2 April 3, 1996 )rint Reproducible Film 1 C....-'~ MARATHON OIL COMPANY /t/, ' "l{ec'e~ved By: · '~!"!~' 4 ~99'(' Kirsten K. Gamel Date: ^lasg.a., 0il.& (ias,ti0ns..OumCss~* Enclosures A subsidiary of USX Corporation Environmentally aware for the long run. Alask~ :gion Domestic Production Marathon Oil Company P.O. Box 196168 Anchorage, AK 99519-6168 Telephone 907/561-5311 April 7, 1997 Mr. Blair Wondzell Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501-3192 Dear Mr. Wondzell: Marathon Oil Company intends to abandon the Corea Creek Federal #1 well this summer. Enclosed in triplicate, is the Application for Sundry Approval, the proposed abandonment summary, wellbore diagram, and a summary of the testing and plugging performed to date. The tentative start date for this work is May 15, 1997. If you have any questions please contact Lance Lamons at 907-564-6332. Sincerely, / I ,l~,l~~_~~ ........................... ~..~ T. J. I~¢acevich Operations Superintendent Attachments cc: CEF RECEIVED AP,~ 10 1997 Alaska 0il & Gas Cons. Coml~issJor~ Anchorage A subsidiary of USX Corporation Environmentally aware for the long run. STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS O:\EXCEL~AOGASA.XLS 1. Type of Request: Abandon X Suspend Operation Shutdown Alter Casing Repair Well__ Plugging __ Change Approved Program Pull Tubing Variance Re-enter Suspended Well Time Extension Stimulate Perforate Other 2. Name of Operator MARATHON OiL COMPANY 3. Address P. O. Box 196168, Anchorage, AK 99519-6168 4. Location of Well at Surface 1567' FSL, 1573'FEL, SEC 12, T1N, R13W, S.M. At top of Productive Interval s. Type of Well: Development Exploratory .~X Stratigraphic __ Service 6. Datum Elevation (DF or KB) 32.2 RKB feet 7. Unit or Property Name COREA CREEK FEDERAL 8. Well Number COREA CREEK FEDERAL #1 9. Permit Number 95-0123 2526' FNL, 2614' FEL, SEC 12, T1N, R13W, S.M. @5394' TVD At Effective Depth 1833' FNL, 2469' FEL, SEC 12, T1N, R13W, S.M. @5925' TVD At Total Depth ~ 1694' FNL, 2030' FEL, SEC 12, T1N, R13W, S.M. @9052' TVD 10. APl Number 50-133-20467 11. Field/Pool WILDCAT/TYONEK 12. Present Well Condition Summary Total Depth: measured true vertical 9738 feet Plugs (measured) 9052 feet 9571',8644',6470',5674' Effective Depth: measured true vertical 5674 feet Junk (measured) 5198 feet Casing Structural Conductor Surface Intermediate Production Liner Perforation Depth: measured Length Size Cemented Measured Depth 79' 20" DRIVEN 111' 295' 13 3/8" 190 SX 327' 2531' 9 5/8" 870 SX 2563' 9656' 7" 1200 SX 9688' 5860'-5890',6620'-6650',7095'-7115',9086'-9101' 9105'-9175',9320'-9350' true vertical 5394'-5420', 6057'-6083', 6478'-6496', 8400'-8415', 8419°-8489', 8634'-8664' Tubing (size, grade, and measured depth) 3 12/", 9.3#, L-80, BUTTRESS, @ 5484' Packers and SSSV (type and measured depth) BAKER SAB 84-40X32 PACKER @ 5317' True Vertical Depth 111' 327' 2490' 8973' ALL P/A'D RECEi'VED Ar~chora_~a BOP Sketch 13. Attachments Description Summary of Proposal ~ Detailed Operations Program ...... 14. Estimated Date for Commencing Operation 5-15-97 16. If Proposal was Verbally Approved Name of Approver Date Approved 15. Status of Well Classification as: Oil ..... Gas X Service Suspended 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed~: ~,,~D' 1 (~~'"~ Title 0,25, Date ~onditions of Approval: Plug Integrity f Mechanical Integrity Test ~pproved by Order of the Commission orm 10-403 Rev. 06/15/88 FOR COMMISSION USE ONLY Notify Commission so representative may witness BOP Test /,'"" Location Clearance --{JRf,~iRS' ~'' Subsequent Form Required 10-., .. David W. Johnsto~ ORIGINAL IAppr°val N°'._~ ~ ~'"' 0 V/ Date Submit in Triplicate ~, Corea Creek #1' Hanger (32.2-32.8, OD:6.050, ID:2.992) Structural Casing (0.0-111.0, OD:20.000, Wt:133.00) (0.0-5483.4, OD:3.867, ID:2.992) Surface Casing (0.0-327.0, OD:13.375, Wt:61.00) Tubing (32.8-5483.4, OD:3.500, ID:2.992) Production Casing (0.0-7770.0, OD:7.000, Wt:26.00) Camco Injection Mandrel (890.4-897.3, OD:5.875, ID:2.992) Intermediate Casing (0.0-2563.0, OD:9.625, Wi:43.00) Existing 80-40 K Anchor (5315.7-5316.8, OD:4.750, ID:3.250) Baker SAB 84-40x32 Packer (5316.8-5321.7, OD:5.687, ID:3.250) Camco X Nipple (5369.8-5377.4, OD:3.950, ID:2.813) Camco X Nipple (5445.7-5447.1, OD:3.950, ID:2.813) Wireline Rentry Guide (5482.7-5483.4, OD:3.867, ID:2.992) Cement Plug (5674.0-6115.0, OD:6.276) Perf (5860.0-5890.0) Fill (61.15.0-6470.0, OD:6.276) Perf (6620.0-6650.0) Cement Plug (6470.0-6907.0, OD:6.276) Cement Plug (6894.0-7170.0, OD:6.276) Perf (7095.0-7115.0) Bridge Plug (7170.0-7175.0, OD:6.276) Production Casing (7770.0-9688.0, OD:7.000, Wt:29.00) Cement Plug (8644.0-8844.0, OD:6.184) Sand Plug (8833.0-9524.0, OD:6.184) Perf (9086.0-9101.0) Perf (9105.0-9175.0) Perf (9320.0-9350.0) Cement Retainer (9571.0-9575.0, OD:6.184) APl 50-133-20467 4/8/97 Corea Creek #1' Structural Casing (0.0-111.0, OD:20.000, Wt:133.00) Surface Casing (0.0-327.0, OD:13.375, Wt:61.00) Intermediate Casing (0.0-2563.0, OD:9.625, Wt:43.00) Production Casing (0.0-7770.0, OD:7.000, Wi:26.00) Proposed Cement Plug (33.0-204.0, OD:6.184) Proposed Perrs (200.0-2Q4.0) Proposed Plan Proposed Cement Plug (2300.0-2504.0, OD:6.184) Proposed Perfs (2500-2504) 3-1/2" Tubing (0-5483.4, OD:3.500, ID:2.992) Cement Plug (5674.0-6115.0, OD:6.276) Perfs (5860.0-5890.0) Fill (6t 15.0-6470.0, OD:6.276) Perfs (6620.0-6650.0) Cement Plug (6470.0-6907.0, OD:6.276) Cement Plug (6894.0-7170.0, OD:6.276) Perfs (7095.0-7115.0) Bridge Plug (7170.0-7175.0, 0D:6.276) Production Casing (7770.0-9688.0, OD:7.000, Wi:29.00) Cement Plug (8644.0-8844.0, OD:6.184) Sand Plug (8833.0-9524.0, OD:6.184) Perfs (9086.0-9101.0) Perfs (9105.0-9175.0) Perfs (9320.0-9350.0) Cement Retainer (9571.0-9575.0, OD:6.184) APl 50-133-20467 4/8/97 COREA CREEK FEDERAL #1 ABANDONMENT 1) Pressure test 13 3/8" X 20" annulus to 500 psi. 2) Pressure test 9 5/8" X 13 3/8" annulus to 500 psi. 3) Pressure test tubing and cement plug backs to 1500 psi. 4) RIH w/perfguns and perforate 3 ~A" and 7" casing at +_ 2500'. 5) Est. Circulation in 3 ½" X 7", 7" X 9 5/8" annulus. 6) Spot 200' plug in both annuluses and inside of 3 ½" tubing. 7) W.O.C. 8) Test cement plugs in tubing, 3 iA" x 7", and 7" X 9 5/8" annuluses to 1500 psi. 9) R.IH w/per guns and perforate 3 ~A" and 7" casing at 200'. 10) Establish circulation in 3 ½"x 7" and 7" X 9 5/8" annulus. 11) Set 200' cement plug to surface in 3 V2" tubing, 3 ½" X 7" and 7" X 9 5/8" annulus. 12) W.O.C. '13) N/D Tree and casing spools. 14) Cut 20", 13 3/8", 9 5/8", 7" casing and 3 ~A" tubing at bottom of cellar. '15) Weld on abandonment marker per state regulations. 16) Clear Pad and abandon same as per Kenai Peninsula Borough regulations. F:' ~"~ R I,'11 T 13 A T A T D A T A P L U S /o/~ .,C'(~ '7 ~ P ,E,'. <j e: D a !: e ~ '1...,'."/" 0 6 /, ..C 6 R !J N Ii, A T E __R E C V Iii, g~ ..... 123 CORE PH,C, TOS ~,,R", CORE '1 g,. 2 g5 .... j .,.,.~ ~, ,x ,-~nRE APT ILr',Q 95-12:3 DAILY WELL C, PS i.~'2/"27/'96 - 4/'2~/96 95 .... 123 DIR SURV g.R~,AKER HUGI-'iES 95"- 123 ARRAY INDUCTION ~CC, L. OR 05/'0 2 '" 9 6 ' / 05/0 2./" 96 05,/0 ~/."' 9 E, 05/"0° '"gE, ,~.. ,,, 05,,,'" 0 '~/' 96 95 ..... I .2. 3 95 ...... i,~ '~' 3 ..... 123 95- 123 95 .... 123 ,C ,2, R E ~ L. D T/' ,C N L ,/G R ~ B I_ CORE[ F'FtSOF~ Ih,ID ,L & SEF'IA TVD ~2a---~'~'b "1 & SEF'IA 'FVD )A~"-.A~)~P 1 05/0 2/'96 05/' 02/' 96 05/,/02//96 05/02/'96 05/02,/96 O 5 / 02/" 96 95 .... 123 95 .... '123 95 .... 123 95 ...... 123 95 ~ 123 95 ..... l 23 95 - 123 LDT//'CNL/,'",3F: .~<--BL.. &. SE!PZA ~Z~'--. ~.~'"~(~ "1 , LIT'HO DENS~,.q?~7,¥....~- C,S, LOR ONLY ~ ~ ~ .~i,/~,~ 2 P H A S 0 R I N P U C 05 ./' 0,,. ''~ ./" 96 05/02/'96 0 E,/02. / 96 05/'0 ''~/'96 0 5 / 0 7 ,,,'"' 96 o572:?:/96 '" '"'/'96 05t" X ,,.,. ,, 95 ..... I 23 ,CBT _~:"'". SEPIA .... AFTER ':SCiUEE/~E 1 ~-~,f'~ 2 C) 5/'22/'96 95-' t 2:3 CBT ,-E" SEPIA ~%~6-. q'F'¢'~ '1 95-1°". .',, C~ FH k'IICRO lh.'iAG ~:'~SEF'IA ';ZF~-.q,?~¢,~ 05/' '22 :/96 95 .... 123 95 .... 123 95 .... 123 95 .... 123 05 ,,/22 ,,/96 C) 5 ,,"" ''~ ''~' /9 6 05/2 8/'"' 96 06/' 214./" 96 9 5 ..... t 23 "96 ~SEF:'IA 9175 9250 '1 C C, 1','1 F' R P "I" 6/" 6 .,. .... . (') 6//2 a./' 96 9 5 .... I 23 C.C,i','IF' RC.D 6,/"13,/'96~ SEF'IA 7095 ..... ? 1'15 '1 0 '?/"0 '1 .,," 9 6 ..... '" (] '1/96 95 '* "i 23 F L II D L. VI 6/' 1 "'"/' .96 ~:~: E P I .,':\ 50 "." 88 a.. 0 1 07 ,,.' ,'3 e o '1 o,:2 "1' c: a '1 ivi a 't: e r' i' a '1 s Z n ye n 't o r" y RUN DATE .... REC',,,,'D , 07/" 08 ,,,'" 96 95 ..... i23 COI~"iP F.:CD F'C:,':SISET/SEF':[A '7200 .... 6900 0 '7/,"'08/9 6 9 F .... I 23 95"-'123 ,SC, HP RCD '7/"I,/"96 · , "1 07/" 08//96 F ZI'.AL 08/"05/'"96 95-.12~ ,t ~-C, HF, RC:D 7/'2/ 96 4:-'~900-.9135 F],:N,AI~ OS/'0R /'96 95 .... '12 3 95 ...... I '2 !ii 95 ...... I 23 *, r'e dr'y ',:,! a s 't: h e w e '1 '1 Ar'e v,/e'll We I 1 'i' s C C, I'.t H E N T S /'0 ~=:',/," 96 08 .... ' · 08/"0 B/96 I'10 L.. Alaska Ri`'' ~ Domestic Production Marathon Oil Company P.O. Box 196168 Anchorage, AK 99519-6168 Telephone 907/561-5311 September 5, 1996 ARCO Alaska, Inc. Attn: Mr. Pat Foley P. O. Box 100360 Anchorage, AK 99510-0360 Bureau of Land Management Attn: Joe Dygas 6881 Abbott Loop Rd. Anchorage, AK 99507-2591 Mr. Cliff Burglin P. O. Box 131 Fairbanks, AK 99707-0131 Alaska Oil & Gas Conservation Commission Attn: . Mr Howard O kland 3001 Porcupine Drive Anchorage, AK 99501-3192 RE: Marathon Corea Creek Federal No. 1 Well Data Section 12, T1N, R13W Kenai Peninsula Borough, AK Gentlemen: Listed below are the FINAL three Daily Well Operations Reports for the above- mentioned well. Please sign below and return this letter confirming your receipt of the data. Please consider this information confidential and for use only within your organization. Daily Well Operations Reports for August 7, 8 and 20, 1996 Regards, V. Miesse Exploitation Manager SEP 0 3 1996 Alaska Oil & Gas Co,Is. Commission Anchorage Received by: Date: A subsidiary of USX Corporation Environmentally aware for the long run. MARATHON OIL COMPANY DAILY WELL OPERATIONS REPORT PAGE I OF I DATE: 8/7/96 FIELD: Corea Creek Field WELL #: CC #1 FILL DEPTH/DATE: 6132' (7/12/96) TUBING: 3-1/2" 9.3~, 5482' CASING: 7"- 9688' DATE LAST WL WORK: 7/12/96 TREE CONDITION: Good WORK DONE: Blow down well w/N2 and CT BENCHES OPEN: None PRESENT OPERATION: Set cement plug across TI ~, WOC TI #1, 2, 4, 5, 8 plugged back PROBLEMS: SUMMARY OF OPERATIONS 8/6/96 Received AOGCC approval {Blair Wondzell) for "Opertaion Shutdown" for 1 year. Dowell spotting CT equipment on location. RU BOPs w/night cap. 8/7/96 Continue RU 1-3/4" CTU. :Conduct safety, operations and environmental meeting. Fill coil w/fresh water and PT to 4000 psig. Good test. Open well. WHP = 905 psig. Bleed off WHP (gas) to 200 psig while RIH. Maintain +/- 200 psig throughout job. At 1600', start pumping fresh water at 1/2 bpm. Tag fill at 611,5'. PU to 6000'. Mix up 23 bbls 15.9///gal cement slurry {112 sacks class G cement, 13.4 bbls fresh water, 2.24 gallons D145A turbulance inducer, 3.3 gallons D47 anitfoam). Yield = 1.15 ft3/sack. Pump 18 bbls cement at 1.45 bpm and displace w/fresh water. RIH to 6115'. Begin POOH after pumping I bbl of cement out nozzle. POOH to §650' on a 1:1 displacement. PU to 5600' and circulate 33 bbls fresh water. POOH pumping an additional 40 bbls fresh water. OOH. Left 365 psig on wellhead. Top of cement calculated at 5650'. Secure well. Wait on cement. Tomorrow: test cement plug and tag w/CT. Note: Peak hauled 9 rolls of Geotex to CLU Pad 1. APC hauled two loads of water to 41-18 (50 bbls rec, RECEIVED S EP o9 996; WELL TESTS: BEFORE: AFTER: COMMENTS: TP CP DATE DAILY COST: $ Inc. CUM: $ 430,460 REPORTED BY: Olson ORIGINAL MARATHON OIL COMPANY DALLY WELL OPERATIONS REPORT PAGE I OF I DATE: 818/96 FIELD: Corea Creek Field WELL #: CC #1 FILL DEPTH/DATE: 5674' (8~8~96) TUBING: 3-1/2" 9.34¢, 5482' CASING: 7"- 9688' DATE LAST WL WORK: 8/7/96 TREE CONDITION: Good WORK DONE: Set cement plug across TI #8 BENCHES OPEN: None PRESENT OPERATION: Job complete - tagged cement plug @ 5674' TI #1, 2, 4, 5, 8 plugged back PROBLEMS: SUMMARY OF OPERATIONS 0700 RU 1-3/4" CTU. 0740 PT to 4000 psig. Open well. WHP = 100 psig. Pressure up well to 1100 psig. Monitor leak off for 30 minutes. Pressure dropped 26 psi in 30 minutes. Good test. Bleed off pressure. 0830 RIH and tag cement plug at §674' (186' above top perf). 0930 POOH to 100'. Could not get N2 pump working to blow down CT. Decide to POOH. 1200 RD. Mob CT equipment to Pad 14-6. Cleanup location. Shutdown power and secure well. APC hauled 85 bbls exempt water to 41-18. Work remaining: install BPV in tree. WE PD BWPD TP CP DATE BEFORE: AFTER: COMMENTS: DAILYCOST: $ 27,800 CUM: $ 458,260 REPORTED BY: Olson Ot I INAL MARATHON OIL COMPANY DALLY WELL OPERATIONS REPORT PAGE I OF I DATE: 8/20/96 FIELD: FILL DEPTH/DATE: 5674' (8~8~96) TUBING: DATE LAST WL WORK: 8~8~96 WORK DONE: Test/tag cement plug PRESENT OPERATION: Well secured w/BPV PROBLEMS: Corea Creek Field WELL #: CC #1 3-112" 9.3~, 5482' CASING: 7"- 9688' TREE CONDITION: Good BENCHES OPEN: None TI #1, 2, 4, 5, 8 plugged back SUMMARY OF OPERATIONS GLM on location. Check WHP = 100 psig. Well blew down in less than 2 minutes. Set 3" Type "H" BPV in tubing hanger. Secure well w/lock/chain. Leave location. Note: Marathon owns BPV. WELL TESTS: BEFORE: AFTER: COMMENTS: MSCFPD BWPD TP CP DATE DAILY COST: $ 1,105 CUM: $ 459,365 REPORTED BY: Olson ORIGinAL Alaska~ .~n Domestic Production Marathon Oil Company August 16, 1996 P.O. Box 196168 Anchorage, AK 99519-6168 Telephone 907/561-5311 ARCO Alaska, Inc. Attn: Mr. Pat Foley P. O. Box 100360 Anchorage, AK 99510-0360 Bureau of Land Management Attn: Joe Dygas 6881 Abbott Loop Rd. Anchorage, AK 99507-2591 Mr. Cliff Burglin P. O. Box 131 Fairbanks, AK 99707-0131 Alaska Oil & Gas Conservation Commission Attn: Mr. Howard O~kland 3001 Porcupine Drive Anchorage, AK 99501-3192 RE: Marathon Corea Creek Federal No. I Well Data ~ S; - I?--'~ Section 12, T1N, R13W Kenai Peninsula Borough, AK Gentlemen: The data listed below are supplied to you for the above mentioned well. We will forward any additional data as it becomes available. Please sign below and return this letter confirming your receipt of the data. Please consider this information confidential and for use only within your organization. Daily Well Operations Report May 25, 1996 to July 12, 1996 Exploitation Manager RECEIVED AUG 9 199 o Alaska 0il & Gms Cons. Commlssi,~l. Anchorage kz:EXPL~ccrk0816.1tr Enclosures Received By: Date: A subsidiary of USX Corporation Environmentally aware for the long run. SENT BY:Marathon 011 Company 6115' 5674' ; 8-19-96 ;10:21Aff ; Anchorage-~ WELL: COREA CPd~,EK FED il 907 276 7542;# 11 I fill at 6115,. Place l0 bbl eemsnt plug to 5674,. PT 7100 paj against cement plu~. Good t~s~, Taq cemen% at 5674' SI Well add secure location. Final repoz~c. Total flared gaz = 83.33 mscf. RECEIVED AUG 1 9 1996 Alaska Oil & Gas Cons. Commission Anchorage Gradient Survey Chart 2 o · 1000 2000 ...3000 c34000 5000 6000 7O00 CC #1 Gradient Stops 6/16/96 · Flowing ---~-- 7105' md 1 hr stop 50O PRES., (PSIA) Page 1 Gradient Survey Chart 2 cc #1 Gradient Stops 6/14/96 6000 -- 7OOO 8OOO - 200 400 ~OO 800 1,000 I 200 1,400 1,600 1,800 PRES., (PSlA) 1 o00 2000 3000 ~4000 5OOO Flowing ~7105' md 1 hr stop 2 000 Page 1 Gradient Survey Chart 3 lOOO 2000 30o0 5OOO 600O 7000 CC-1 Gradient Stops 6/16/96 · Flowing 50 60 70 80 90 100 110 TEMP., (F] 120 130 140 Page 1 Gradient Survey Chart 3 1000 2000 I- uJ 50oo 6000 7OO0 8OO0 CC-1 Gradient Stops 6/14/96 60 70 80 90 100 110 120 130 TEMP., (F) 140 Flowing Page 1 Alaska ~ Domestic Production Marathon Oil Company P.O. Box 196168 Anchorage, AK 99519-6168 Telephone 907/561-5311 August 12, 1996 Blair Wondzell Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501-3192 Dear Blair: Enclosed is the AOGCC Well Completion or Recompletion Report and Log Form 10-407 for Corea Creek Federal #1. If you have any questions, please contact me at 907-564-6315. Sincerely, Michael R. Olson Production Engineer Attachments cc: CEF AUG I 5 1996 Oil 8, G~s Cons. commissior~ Ar~chom9e A subsidiary of USX Corporation Environmentally aware for the long' run. CFjit ,SENTiAL ......... : i" STATE OF ALASKA ' ' .... : AL,-,,.,KA OIL AND GAS CONSERVATION cor~ .... :SSION '"" '; .... ~ ' - WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1. Status of Well Classification of Service Well OILN GAS~-~ SUSPENDED~'~ ABANDONEDr~ SERVICE~----~ 2. Name of Operator 7. Permit Number MARATHON OIL COMPANY 95-0123 3. Address 8. APl Number P. O. Box 196188, Anchorage, AK 99519-6188 50-133-20467 4. Location of Well at Surface t ¢-~,~'.'~LET!0~ ~ 9. Unit or Lease Name 1567' FSL, 1573' FEL, Sec. 12, T1 N, R13W, S.M. ! _ ~ATF_,/ f ,, , Corea Creek Federal At top of Producing Interval i ~/,/,/,/,/,/,/,/,//~IFiE~ ~1 ~ 10. Well Number 2526. FWL, 2614' FEL, Sec. 12, T1N, R13W, S.M. {~ 5394' tvd L...~_~.~..~J _~.~ Corea Creek Federal #1 At Total Depth ~ '- 11. Field and Pool 1694' FNL, 2030' FWL, Sec. 12, T1N, R13W, S.M. ~ 9052' tvd .. ......... ' .: ; WildcatJTyonek 5. Elevation in feet (indicate KB, DF, etc.) 16. Lease Designation and Serial No. 32.2' RKBI A-024399 12. Date Spudded 13. Date T.D. Reached 14. Date Comp., Susp. or Aband. 115. Water Depth, if offshore 116. No. of Completions 2/27/96 4/2/96 - 9738' md 5/31/96 - Completed'1 N/A feet MSLI Single 17. Total Depth (MD+'I'VD)9738, md/9052' tvd 18. Plug Back Depth (MD+TVD)5674. md/5235' tvd 19. Direclional Survey Yes, ,No[~ _r~ 120' Depth where sSsv set N/A feet MD 121' ThIckness °f Permafr°st N/A 22. Type Electric or Other Logs Run Resistivity Sonic, Density Neutron, Dip Meter, CMR/GR, VSP, CET/CBT, TDT 23. CASING, LINER AND CEMENTING RECORD SETTING DEPTH MD CASING SIZE WT. PER FT. GRADE TOP BOTTOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED 20" 133# K-55 0' 113' DRIVEN 13-3/8" 61# K-55 0' 327' 17-1/2" 280 SX 9-5/8" 43~ L-80 0' 2563' 12-1/4" 870 SX 7" 29/26~ P-110IN-80 0' 9686. 8-1/2" 1200 SX 24. Perforations open to Production (MD+TVD of Top and Bottom and 25. TUBING RECORD interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD) There are no open perfs. 3-1/2" 5484' 5317' Plugged back and abandoned: 5860-5890' md, 5394-5420' tvd, 2-1/2" HC, 6 spf 6620-6650' md, 6057-6083' tvd, 2-1/2" HC, 6 spf 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. 7095-7115' md, 6478-6496' tvd, 2-1/2" HC, 6 spf DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED 9086-9101' md, 8400-8415' tvd, 1-1/16.' Pivot, 4 spf 9586. 30 bbls cement 9105-9135' md, 8419-8449' tvd, 2-1/2" HC/2-1/8" E J3, 12 spf 9302-9304' 20 bbls cement 9135-9175' md, 8449-6489' tvd, 2-1/8" E J3, 6 spf Production Perfs See Operation Summary, all perfs P/A'd 9320-9350' md, 8634-8664' tvd, 2-1/2" HC, 6 spf 27. PRODUCTION TEST Date First Production I Method of Operation (Flowing, gas lift, etc.) 6/14/96I Flowing Date of Test Hours Tested PRODUCTION FOR OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE IGAS-OIL RATIO 6/19/96 23.5 TEST PERIOD --~, 11 0 48/64 I FIowTubing Casing Pressure CALCULATED OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-APl (c0rr) Press. 1 psig 1250psig 24-HOUR RATE--~ 11 0 ':~8. ' CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil', gas or water. Submit core chips. Core #1 5825-5872' md Interbedded sandstone and carbonaceous shale (description attached). Core #2 8155-8211' md Interbedded coal, carbOnaceous shale_and sandstone (description attached). RECEIVED Form 10-407 Submit in Triplicate Rev. 7-1-80 CONTINUED ON REVERSE SIDE 29. 30. GEOLOGIC MARKERS FORMATION TESTS Include interval tested, pressure data, all fluids recovered NAME MEAS. DEPTH TRUE VERT. DEPTH and gravity, GOR, and time of each phase. Beluga 2147' 2136' Tyonek 5612' 5183' Test description attached. 31. LIST OF ATTACHMENTS Wellbore Diagram, Perf Summary, Operation Summary Report, Geologic Information, Directional Survey '32. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed ~~/,~ ~/~/ .. Title Production Engineer Date INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Item 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.) Item 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-in, Other- explain. Item 28: If no cores taken, indicate "none". [ ECEIVED Form 10-407 MARATHON OIL COMPANY DAILY WELL OPERATIONS REPORT PAGE 1 OF 1 DATE: 7/12/1996 FILL DEPTH/DATE: DATE LAST WL WORK: WORK DONE: PRESENT OPERATION: PROBLEMS: FIELD: Kenai Gas Field PBTD 6470' TUBING: 3.5" 9.3#, 5482' CASING: 7/11/96 TREE CONDITION: Ran gradient survey BENCHES OPEN: Blowdown well, grabe sampies for analysis High pressure, suspected cement stringers below 6233' WELL #: cc~l 7.0" 29# 9688' new t-l, t-2, t-3 SUMMARY OF OPERATIONS 'Dowell RU CT Crane operator arrived, PU grease head stab over tree. PT CT to 4000 psi with water. Displaced the CT with H20. Held environmental and safety review and went over the procedure. RIH with CT, at 2000' started pumping N2 at a rate of 250 scf/min, while running hole. Coil down to 6132" KBD sat down, PUH CT to 6101'. RIH tagged area again. Sat down easy at 6153' (300" shy of target tag). PUH to 6120'. RIH increase N2 rate to 1000 scl/min, while funning in hole, sat down at 6153'. CT pressure up to 3590 psi. appears that the coil is plugged. POOH with coil. At surface with coil, CT has 3100 psi on coil, bled to atmosphere slowly. Pulled the nozzle, nozzle clear, pulled both checks bottom ball check was fine. The upper check was plugged solid with cement. Cut off a couple of feet of coil, pressure on coil where cut made. Bled down prior to removing the peace of coil. Pumped nitrogen into CT with the coil nozzle exposed at surface. Blew 3-4 bbls water and cement out of the coil. RU CT to the tree. RIH with coil, coil has new flapper checks at the end of the coil. note:500 gals of Nitrogen pumped away so far, 1500 gals left on site. RIH to 2000 ft start pumping N2 at 250/scfm. CT depth @ 556' WHP=9, CT=339psig spot the coil at 601 l'kbd, start pumping N2 at 1400 scfm to displace the water in well to PTS tank. PU coil to 5991' KB to make sure coil not plugged. WHP= 106 psi, CT=2598 psig N2 in tank = 1000 gal., 500 gals used so far on second trip in well, pulled water samples through out water returns to tank. Total 105 bbls to PTS tank. POOH with coil, CT at 4500' shut down N2 rate to 500 scf/min. Coil at surface, closed the master valve. RD coil tubing unit. Crane stacking equipment on Dowells' trailers for moving part of the equipment on Saturday to their shop. PTS opened well up to tank and flare. Well died at flare, PTS to monitor the well over night. R&Ls will be out on Sunday to haul water to the KGF, pad 41-18, CT reel and other equipment will be moved on Monday. WELL TESTS: M MSCFPD BEFORE: 0 AFTER: 0 COMMENTS: BWPD TP CP DATE DAILY COST: $ '14, 980 CUM' $ REPORTED BY: ClSSELL MARATHON OIL COMPANY DAILY WELL OPERATIONS REPORT PAGE I OF I DATE: 7/11/96 FIELD: Corea Creek Field WELL #: CC #1 FILL DEPTH/DATE: 6470' (7/10/96) TUBING: 3-1/2" 9.3# L-80 CASING: DATE LAST WL WORK: 7/9/96 TREE CONDITION: WORK DONE: Cement plug placed across TI #5 BENCHES OPEN: PRESENT OPERATION: Well open to atm-waitin~ for fluid to reach surface. PROBLEMS: 7" - 9688' Good TI# 8 TI #1, 2, 4, 5 plu~l~led back SUMMARY OF OPERATIONS 0845 HES on location. Conduct safety, environmental, and procedure meeting. RU wireline unit. 1010 SWS on location. MU tandem LMR electronic gauges. 1035 RIH making 5 minute gradient stops at 50', 2000', 4000', 4500', 5000', 5500'. Make 1 hour stop at 5875', and 30 minute stops at 6000' and 6150'. 1401 POOH. 1420 OOH. Down load gauges. 1500 RD equpment. 0700 hrs: Rate -- 12 mscfpd, 0 psig. Rate starting to decline. 1030 hrs: Rate -- 0.4 mscfpd, 0 psig. 1100 hrs: Rate = 0 mscfpd, 0 psig. Unable to record any lower rate w/ 1/8" orifice. Flare out. Based on final stop at 6175" Fluid level at 2547' md. BHP = 1403 psia. iWHP = 18.5 psia. Fluid level building at 1.2 bph. FBHP increased from 1373 psia to 1403 psia in 30 minutes. Note: temperature was stable at 5875', 6000', and 6150'. There was very little change in temperature between 5875' and 6000' (0.7F). There was 3.4F change between 6000' and 6150'. Perfs at 5860- 5890'. Plan to leave well open to get fluid to surface. WELL TESTS: BEFORE: AFTER: COMMENTS: MSCFPD BWPD TP CP DATE DALLY COST: $ 6,360 CUM: $ 406,130 REPORTED BY: OIson MARATHON OIL COMPANY DAILY WELL OPERATIONS REPORT PAGE I OF I DATE: 7/10/96 FIELD: FILL DEPTH/DATE: 6470' (7/10/96) TUBING: DATE LAST WL WORK: 7~9~96 WORK DONE: Cement plu~l placed across TI #5 PRESENT OPERATION: Flowing well PROBLEMS: Sat down at 6233' w/perf gun Corea Creek Field WELL #: CC #1 3-1/2" 9.3# L-80 CASING: 7"- 9688' TREE CONDITION: Good BENCHES OPEN: TI# 8 TI #1, 2, 4, 5 plu~l~ed back SUMMARY OF oPERATIONS 0700 RU Injector head. Made adjustments to goose neck. Replace bad pressure transducer. O915 PT to 4000 psig. Open well. WHP = 30 psig. Pressure test cement plug to 1000 psig. Hold for 30 minutes - good test. 1000 RIH. Start pumping N2 at 250 scf/min at 3000'. Tag cement top at 6470' KB (6' higher than calculated design.) Note slight wt loss at 6342' - possible cement stringers. 1208 PU to 6300' and increase N2 rate to 1450 scl/min. 1236 'Strong N2 returns at surface - total water produced = 67 bbls. 1252 Total water produced = 96 bbls. Pumped 700 gallons of N2. POOH. 1304 At 5400' cut N2 rate to 1000 scf/min and continue POOH. Increase back pressure on well to 1000 psig. 1347 At 150', SI well. Shutdown N2. Total N2 pumped - 1200 gallons. Total water produced = 101 bbls. Fluid level calculated at 6248'. 1400 OOH. Leave 788 psig N2 on well. RD. 1515 SWS on location. Conduct safety, environmental, and procedure meeting. RU. 1815 Establish communications blackout. MU 30' 2-1/2" Hollow carrier, 6 spf, 60 degree phasing, 10.5 gram 34J Ultrajet charges. PT against SI WHP (788 psig). 1930 RIH. Correlate to Exploitation generated log - made pass between 6233' and 5350' (tt). Guns sat down at 6233' - did not try and work past - suspect cement stringers on Iow side. 2100 Set CCL at 5854' and perforate 5860-5890'. WHP = 783 psig. WHP increasing 100 psi/hr. 2218 Open well up at 381 mscfpd rate. WHP = 914 psig. 2300 Rate = 240 mscfpd, 463 psig. 2320 Gas at surface - lit flare, 321 psig. 0000 7/11/96 Rate = 109 mscfpd, 62 psig. 0100 Rate = 41 mscfpd, 11 psig. 0200 Rate -- 24 mscfpd, 6 psig. 0300 Rate = 15 mscfpd, 1 psig. 0400 Rate = 12 mscfpd, 0 psig. 0500 Rate = 12 mscfpd, 0 psig. 0600 Rate = 12 mscfpd, 0 psig. Plan to run gradient survey this am. WELL TESTS: MSCFPD BWPD TP CP DATE BEFORE: AFTER: COMMENTS: DAILY COST: $ 48,900 CUM: $ 399,770 REPORTED BY: Olson Spidr Chart 1 CC-l' Perf TI #8 1000 8OO 70O 6O0 300 200 lO0 , ~ Open well, (3= 381 mscfpd · ,, --~ Q= 240 mscfpd ~, Choke adj. / "~"~-"~'~~ ~ /' .-'/' Q 109 mscfpd Q= 12 mscfpd 10 12 14 16 18 20 22 Time, HRS WHP } Page 1 Corea Creek #1 Hanger: 32.2-32.$ (OD:6.050 ID:2.992) Structural Cas~_ng: 111.0 (0D:20.000 Wt:133.00) -/ Surface Casing: 327.0 (0D:13.375 Wt:61.00) Intermediate Casing: 2563.0 (OD:9.625 Wt:43.00) _w / Tubing: 32.8-890.4 (OD:3.50C ID:2.992) J~ / C~CO Injectlon Mandrel: 890.4-897.3 (0D:5.$75 ~ ID:2.992) Production Casing: 7770.0 (OD:7.000 Wt:26.00) Tubing: 897.3-5315.7 (OD:3.500 ID:2.992) -/ 80-40 K Anchor: 5315.7-5316.8 (OD:4.750 ID:3.250) Baker SAB 84-40x32 Packer: 5316.8-5321.7 (OD:5.687 ID:3.250) Tubing: 5321.7-5369.8 (OD:3.500 ID:2.992) Camco X Nipple: 5369.8-5377.4 (OD:3.950 ID:2.813) Tubing: 5377.4-5445.7 (OD:3.500 ID:2.992) --~ Camco X Nipple: 5445.7-5447.1 (OD:3.950 ID:2.813) --/ Tubing: 5447.1-5482.7 (OD:3.500 ID:2.992) Nireline Rent ry Guide: 5482.7-5483.4 (OD:3.$67 ID:2.992) Cement Plug: 5674.0-6115.0 (OD:6.276) [Core 5825.0- 5885.0 Perf 5860.'0 - 5890.0 Fill: 6115.0-6470.0 (OD:6.276) --/ Perf 6620.0 - 6650.0 Cement Plug: 6470.0-6907.0 (0D:6.276) Cement Plug: 6894.0-7170.0 (OD:6.276) Perf 7095.0 - 7115.0 Bridge Plug: 7170.0-7175.0 {OD:6.276) ProducTion Casing: 7770.0-9688.0 (OD:7.000 Wt:29.00) Cement Plug: 8644.0-8844.0 (OD:6.184) COREA CREEK FED #1 PERFORATION SUMMARY DATE Perf'd 5/31/96 6/1/96 612/96 6~6~96 6~6~96 6113/96 6/24/96 7/10/96 P/A'd 6/17/96 6/17/96 6/17/96 6/17/96 6/17/96 6/23/96 7/9/96 8/7/96 PERFORATIONS MD 9320-9350 9105-9135' 9105-9135' 9086-9101' 9135-9175' 7095-7115' 6620-6650' 5860-5890' 'TVD 8634-8664' 8419-8449' 8419-8449' 8400-8415' 8449-8489' 6478-6496' 6057-6083' 5394-5420' SAND T3 TI#1 T3 TI#2 T3 TI#2 T3 TI#2 T3 TI#2 T2 TI#.4 T2 TI#5 T1 TI#8 SPF 6 6 6 4 6 6 6 6 GUN TYPE 2-1/2" Hollow Carder 2-1/2" Hollow Carder 2-1/8" Enerjet III 1-11/16" Pivot 2-1/8" Enerjet III 2-1/2" Hollow Carder 2-1/2" Hollow Carder 2-1/2" Hollow Carder WELL: COREA CREEK FED #1 DATE 02/27/96 02/28/96 02/29/96 03/01/96 03/02/96 03/03/96 03/04/96 03/05/96 03/06/96 RPT DEPTH 327 327 327 1280 2137 2585 2585 2585 2585 MUD" WT'. 8.900 9.000 8.650 8.950 9.300 9.450 9.600 9.500 9.700 DALLY: OPERATIONS SUMMARY ACCEPTED RIG FROM MOB AT 1630 HRS 2-26-96. TAGGED AT 35'. SPUDDED WELL AT 1700 HRS. CONTROL DRILLED FROM 35' TO 327'. CIRCULATEO. MADE SHORT TRIP TO SHOE AT 111'. CIRCULATED. POOH. POOH. P/U 9 JTS DP. R/U AND RUN 13 3/8" CASING TO 327'. CIRCULATEO. RAN STAB IN STRING AND CIRCULATED. R/U ANO CEMENTEO CASING WITH 280 SX OF CEMENT. POOH W/STAB IN STRING. MADE CUTS ON 13 3/8" ANO 20" CASINGS. WELDED ON SLIP ON WELLHEAD ANO TESTEO SAME. N/U OIVERTER SYSTEM. R/U DIVERTER SYSTEM, BELL NIPPLE AND FLOgLINE. FUNCTION TESTED DIVERTER AND TESTEO ACCUMULATOR. L/D DRILL PIPE ANO BHA FROM OERRICK. FINISHED L/D PIPE FROM DERRICK. M/U DIRECTIONAL BHA. REPAIRED SCR. CBU. DRILLED CEMENT AND FLOAT EQUIPMENT 321' TO 327'. CBU. DRILLED AND SURVEYED FROM 327' TO 1280'. DRILLED FROM 1280' TO 1503'. CBU. MADE WIPER TRIP TO SHOE. DRILLED FROM 1503' TO 2137'. DRILLED AND SURVEYED FROM 2137' TO 2507'. REPAIRED MUD PUMP. DRILLED TO 2585~. CBU. WIPER TRIP. FINISHED WIPER TRIP TO 1101'. CBU. POOH. L/D DIRECTIONAL TOOLS. R/U TO LOG. RIH. COLILDNOT GET PAST 2118'. LOGGED TO SHOE WITH SP DITE LDT CNL. POOH AND R/D. RIH AND TAGGED UP AT 2118'. REANED FROM 2118' TO 2585'. CBU. WIPER TRIP TO 2075e.CBU. POOH, R/U TO LOG. RIH WITH SP DITE LDT CNL. LOGGED FROM 2585' TO 2118'. POOM. FINISHED LOGGING. BHA. RIH. CIRCULATED AT 2585'. REDUCED MUD WEIGHT. POOH. PULLED WEAR BUSHING. R/U TO RUN CASING. STARTED RUNNING 9 5/8" CASING. RAN 9 5/8" CASING. REPAIRED FLOWLINE. FINISHED RUNNING CASING WITH SHOE AT 2563'. CIRCULATED AND CONDITIONED MUD. RAN STAB IN CEMENTING STRING. CEMENTED WITH 700 SK5(185 BBLS) LEAD AND 2?0 SKS(56 BBLS) OF TAIL. PULLED STAB IN STRING. R/D STAB IN STRING RUNNING TOOLS AND CASING TOOLS. CLEANED CELLAR AREA. STARTED N/O DIVERTER. OPERATION SUMMARY REPORT WELL: COREA CREEK FED #1 DATE 03/10/96 03/11/96 03/12/96 03/13/96 03/14/96 03/15/96 03/16/96 03/17/96 03/18/96 03/19/96 RPT 14 15 16 17 18 19 2O 21 22 DEPTH 3156 3576 4410 5202 5376 5825 5873 6128 666O 7055 MUD. WT. 9.500 9.600 10.100 10.000 10.000 10.000 10.050 10.150 10.200 10.100 DALLY OPERATIONS SUNHARY CASING TO 2000 PSI. DRILLED CEMENT, FLOAT COLLAR, FLOAT SHOE AND 5' OF FORMATION TO 2590'. CIRCULATED. TESTED SHOE TO 13.1 PPG EMW. DRILLED FROM 2590' TO 2818'. CBU. POOH, HAD TO PUMP OUT LAST 6 JOINTS. RIH TO 2818'. CBU. POOH TO 2530'. PUMPED SPUD MUD FROM ACTIVE PITS. CLEANED PITS. STARTED MIXING POLYMER MUD. MIXED UP 675 BBLS POLYMER MUD AND SPACER PILLS. DISPLACED MUD WITH PILLS ANO POLYMER MUO. ORILLED FROM 2818' TO 3156'. DRILLED FROM 3156' TO 3341'. CIRCULATED. POOH, HAD TO PUMP OUT 15 JTS TO GET TO SHOE. CIRC AND PUMP DRY JOB. POOH. M/U MUD MOTOR AND BIT. RIH TO 2800'. WASHED 2800' TO 3341'. DRILLED FROM 3341' TO 3576'. DRILLED FROM 3576' TO 3855'. CBU. MADE 7 STD SHORT TRIP. DRILLED FROM 3855' TO 4410'. CBU. POOH TO SHOE FOR SHORT TRIP. RIH TO 4410'. DRILLED FROM 4410' TO 4967'. CBU. MADE 7 STD SHORT TRIP. DRILLED FROM 4967' TO 5202' DRILLED FROM 5202' TO 5246'. CBU. POOH. L/D MOTOR. TESTED BOPE. M/U PACKEO DRILLING ASSEMBLY. RIH TO SHOE. SLIPPEO AND CUT DRILL LINE. RIH TO 5246'. CBU. DRILLED FROM 5246' TO 5376' DRILLED FROM 5376' TO 5825'. CBU. MADE WIPER TRIP TO 5066'. CBU. POOH. L/D DIRECTIONAL TOOLS. P/U CORING ASSEMBLY. RIH TO 5825'. CBU. CORED FROM 5825' TO 5875'. CORED FROM 587'5' TO 5885'.CBU. POOH. L/D CORING EQUIPMENT. RECOVERED 45' OF CORE. P/U DIRECTIONAL BHA. RIH TO 5825'. REAMED TO 5805'. DRILLED FROM 5885' TO 6128'. DRILLED FROM 6128' TO 6468'. CBU. MADE WIPER TRIP TO 5531' DRILLED TO ~0' DRILLED FROM 6E~50, TO 6837'. CBU. MADE WIPER TRIP TO 6274'. DRILLED TO 7055'. CIRCULATED AND CONDITIONED MUD. POOH. OPERATION SUMMARY REPORT ',./ELL: COREA CREEK FED //1 DATE RPT' DEPTH MUD UT. DAILY OPERATIONS SUMMARY ,,, BLADED MILL AND RIH. MILLED ON JUNK FROM 7519' TO 7523'. 03/23/96 26 7531 10.300 HILLEO FROM 7523' TO 7528', MILL QUIT TORQUEING UP. POOH. MILL WORN AND 1/2" UNDERGAUGE. RECOVERD 1 CUP OF IRON IN BOOT BASKETS. MAKE UP MILL #2 AND RIH. REAMED 7525' TO 7'528'. HILLED 7528' TO 7531' 03/24/96 27 7656 10.300 MILLED ON JUNK AT 7531'. POOH. RECOVERED ONE CUP OF IRON IN BOOT BASKETS. MILL 80% WORN ANO HAO PATTERN OF MILLING UP CONE. P/U BIT ~/9 ANO BHA. RIH. WASHED 7489' TO 7531'. DRILLEO FROM 7531' TO 7656'. 03/25/96 28 7908 10.300 DRILLED FROM 7656' TO 7665m. CBU. POOH. P/U NEW BIT AND MUD MOTOR. RIH. DRILLED FROM 7665' TO 7908'. 03/26/96 29 8155 10.300 DRILLED FROM 7908' TO 8151'. CBU, EVALUATED CUTTINGS. DRILLED FROM 8151' TO 8155'. CBU, EVALUATED CUTTINGS. MADE SHORT TRIP TO 7245'. CBU. POOH. 03/27/96 30 8215 10.300 FINISHED POOH. P/U CORING ASSEMBLY AND RIH TO 8110'. REAMED 8110' TO 8155'. CBU. CORED FROM 8155' TO 8215'. CBU. POOH. 03/28/96 31 8578 10.300 POOH. L/D CORE. TESTED BOPE. P/U DIRECTIONAL BHA AND RIH TO 8142' REAMED FROM 8142' TO 8215'. DRILLED FROM 8215' TO 8578'. 03/29/96 32 9017 10.400 DRILLED FROM 8578' TO 8740'. CBU. WIPER TRIP TO 7965'. DRILLED TO 9017'. CBU. POOH. BHA. 03/30/96 33 9300 10.450 L/D DIRECTIONAL BHA AND P/U ROTARY DRILLING ASSEMBLY. RIH TO SHOE. SLIPPED AND CUT DRILL LINE. RIH TO 8985'. REAMED TO 9017'. DRILLED FROM 9017' TO 9300'. 03/31/96 34 9528 10.550 DRILLED FROM 9300' TO 9365'. CBU. WIPER TRIP TO 8395'. DRILLED FROM 9365' TO 9528'. CBU AND DROPPED SURVEY. POOH TO SHOE. CBU AT SHOE. POOH. 04/01/96 35 9707 10.800 POOH. BHA.M/U NEW BIT. RIH TO 9418'. REAMED TO 9528'. DRILLED FROM 9528' TO 9707'. 04/02/96 36 9738 10.700 DRILLED FROM 9707' TO 9738'. CBU. MADE WIPER TRIP TO 7838'. CBU. POOH. HOLE TIGHT FROM 7374' TO 6169'. BHA. RETRIEVED SURVEY. L/D MONELS AND P/U REAMING ASSEMBLY. RIH TO SHOE. SLIPPED AND CUT DRILL LINE. RIH. 04/03/96 37 9738 10.900 RIH TO 7433'. CIRCULATED HOLE CLEAN. RIH. REAMED BRIDGE AND TIGHT HOLE FROM 7496' TO 7660'. RIH TO 9475'. REAMED TO 9738'. CIRCULATED HOLE CLEAN AND CONDITIONED MUD FOR LOGGING. PGOH. BHA. R/U TO LOG. 04/04/96 38 9738 10.700 M/U AND RIH WITH RESISTIVITY SONIC LOG TO 9720'. LOGGED FROM 9720' TO 2563'. POOH, L/D TOOLS. M/U AND RIH WITH DENSITY NUETRON TO OPERATION SUMMARY REPORT NELL: COREA CREEK FED #1 DATE RPT DEPTH MUD'WT. DALLY OPERATIONS SUNHARY" . . , , ,, 9720' . LOGGED FRO~ 9720~ TO 2.563~. POOH, L/D TOOL. R/D E LINE. PULLED I,/EAR BUSHING, SET TEST PLUG. STARTED TESTING BOP'S. 04/05/96 39 97'58 10.800 FINISHED TESTING BOPS. RIH TO 9738'. CIRCULATED AND CONDITIONED MUD. POOH. R/U E LINE. RIH WITH DIPMETER TO 9500". AMS QUIT tdORKING. POOH AND CHANGED CXJT SANE. RIH IJ/ DIPMETER TO 9720' AND STARTED LOGGING. 04/06/96 40 97'58 10.800 FINISHED LOGGING IdITH DIPMETER FROM 6200' TO 2563'. P/U CMR/GR AND RIH TO 9600'. TOOL STUCK AT 9017' t4HILE ATTEMPTING TO CALIBRATE. R/U TO STRIP OVER 141RELINE, P/U JARS AND OVERSHOT. RIH STRIPPING OVER IdIRELINE TO 7634', TOOL CAME FREE. CIRCULATED. PULLED TOOL INTO OVERSHOT. R/U AND PULLED OUT OF ROPESOCKET. 04/07/96 41 9738 10.800 POOH I,/ITH IJIRELINE. POOH 14/ DRILL PIPE. L/D FISH, FULL RECOVERY OF LOGGING TOOLS. L/D FISHING TOOLS. M/U BHA AND RIH TO 97'55' CIRCULATED AND CONDITIONED MUD. POOH TO RUN CASING. 04/08/96 42 97'58 10.800 L/D BHA. CHANGED RAMS TO 7'. R/U AND RUN 7" PRODUCTION CASING. 04/09/96 43 9688 10.700 FINISHED RUNNING 7" PROOUCTION CASING. CIRCULATED AND CONDITIONED HUD. CEMENTED FIRST STAGE IJITH 550 SX CEMENT. CIRCULATED AND CONDITIONED I~JD. CEMENTED SECOND STAGE 14ITH 650 SX CEMENT. STARTED NIPPLING DOt4N BOP STACK. 04/10/96 44 9688 10.700 N/D BOP"S. SET CASING SLIPS. MADE ROUGH AND FINAL CUTS. INSTALLED TUBING SPOOL AND TESTED SAME. H/U BOP"S AND LINES. TESTED BOP'S. STARTED LAYING DOtJN 5" DP. 04/11/96 45 9688 10.700 L/D 5 "DRILL PIPE FROM DERRICK. L/D KELLY. P/U 3 1/2" KELLY. TESTED KELLY AND KELLY VALVES TO 250/5000 PSI. P/U BHA. RIH P/U 3 1/2" DRILL PIPE. 04/12/96 46 9688 10.700 RIH P/U DRILL PIPE TO 6930'. DRILLED STAGE COLLAR FROM 6930' TO 6933'. CBU. RIH P/U DRILL PIPE TO 9591'. CBU. TESTED CASING TO 3500 PSI. BLED TO 2600 PSI. POOH. SET RETAINER ON E LINE AT 9571' 14LM. R/D E LINE. 04/13/96 47 9688 10.700 TESTED CASING TO 3500 PSI. R/U AND RAN CET/CBT FROM 9575' TO 2300'. RIX WITH BHA TO DISPLACE 300 ' OF MUD FOR VSP. POOH. R/U AND RIH WITH VSP TAKING CHECK SHOTS. 04/14/96 48 9588 10.700 FINISHED RUNNING VSP LOG. N/U AND TESTED LUBRICATOR. RAN CRT/CBT FROM 6000' TO 5000' UNDER 1500 PSI PRESSURE. POOH AND R/D. N/D LUBRICATOR AND N/U BELL NIPPLE. MOVED BHA TO LEFT SIDE OF DERRICK. RAI~N~i.i~E.~.I~I'~,I~ArI~ER SETTING TOOL. TAGGED RETAINER AT 9588,. CB 04/15/96 49 9588 10.500 CBU.~-TO]C~ME~I~;QUEEZED SHOE THROUGH RETAINER AT 9588' WITH 30 BBLS OF CEMENT. REVERSED OUT. POOH. RAN CRT/CBT FROM 9490' TO Al lska Oil & L~as Coi~. Comnliasion OIiFIDENTIAL i, OPERATION SUMMARY REPORT HELL: COREA CREEK FED #1 · _ DATE:: RPT DEPTH MUD UT'. : DAILY OPERATIONS SUNHARY " i':.:: &B90'. RIH AND SHOT SQUEEZE PERFS FROM 9302' TO 9304'. RIH WITH RETAINER. ATTEMPTED TO SET AT 9280'. POOH. CHECK SETTING TOOL. RIH. 04/16/96 50 9588 10.600 RIH WITH RETAINER ON E LINE. SET RETAINER AT 9280' WLM. POOH AND R/D. RIH WITH RETAINER RUNNING TOOL ON DP. TAGGED RETAINER AT 9298 DPM. SQUEEZEO WITH 20 BBLS OF 15.8 PPG CEMENT. REVERSEO OUT. POOH. P/U BIT ANO JUNK BASKET. RIH TO 9288'. CIRCULATED AND WOC. 04/17/96 51 9588 10.500 CIRCULATED ANO WOC. DRILLED RETAINER ANO CEMENT FROM 9298' TO 9320'. CHASED RETAINER JUNK TO 9580'. CBU. TESTEO CASING TO 2000 PSI. PUMPEO SLUG. POOH. L/D JUNK BASKET AND P/U SCRAPER. RIH TO 9580'. R/U TO CIRCULATE. 04/18/96 52 9588 8.500 PUMPED DOWN SURFACE VOLUME. CLEANED PITS. DISPLACED MUD IN HOLE FRESH WATER, THEN WATER WITH 3%~CL. POOH, L/D DRILL PIPE. 04/19/96 53 9588 8.500 POOH LAYING DOWN DRILL PIPE, HEAVY WT, AND DRILL COLLARS. R/U AND STARTEO RUNNING PRODUCTION TUBING. 04/20/96 54 9588 8.500 FINISHED RUNNING PRODUCTION TUBING. CIRCULATED AND INHIBITED 3%I(CL. SET PACKER. TESTEO PACKER. L/D LANOING JOINT, SET BPV. CHANGEO RAMS IN STACK TO 5". PREP TO N/D 04/21/96 55 9588 N/O BOP'S. N/U TREE AND TESTED SAME TO 5000 PSI. RELEASEO RIG TO OEMOB AT 1300 HRS 4-20-96. POST RIG WELL: COREA CREEK FED #1 .:, ,DATE.: RPT!i.:, , 'DEPTH ,MUD~WT' DAILY OPERATIONS;SUMMARY . ? .!.ii:!::i:' ,, 5/25/96 9580' 'Pull BPV from tubing hanger. RU HES and pull d'u~my v~'ive, install double check orifice valve at 890' 5/30/96 9580' Blowdown well to 8853' w/ N2. 5/31/96 9559' Perf 9320-9350' (T3, TIll) w/ 2-1/2" Hollow Carriers, 6 spf, 60 degree phasing, w/ 1100 psi underbalance. Flow well, unable to maintain 50 mscfpd rate. SI well w/ 1490 psia WHP. 6/1/96 9567' Perf 9105-9135' (T3, TI~2) w/ 2-1/2" Hollow Carriers, 6 spf, 60 degree phasing, w/ 1800 psi underbalance. Flow well from 1510 psia to 759 psia WHP. SI well and monitor PBU. WHP inc to 805 psia in 14 hours. 6/2/96 9577' RIH w/ GR/CCL. Log from 9577' to 5200' Reperf 9105-9135' (T3, TI#2) w/ 2-1/8" Enerjet III, 6 spf, 45 degree phasing, w/ 2800 psig underbalance. Left well SI. WHP inc 15 psi to 815 psi. a in 12 hours. 6/3/96 9577' Blowdown well to atm. 6/4/96 9577' Blowdown well to atm. Shot fluid level = 6771' 6/5/96 9577' Pressure up well to 1500 psig using N2. Attempt to reperf TI#2 using 1.-11/16" Pivot guns - two misruns. 6/6/96 9577' Perf 9086-9101' (T3, TI#2) w/ 1-11/16" Pivot gun, 4 spf, 180 degree phasing. Perf 9135-9175' (T3, TI#2) w/ 2-1/8" Enerjet III, 6 spf, 45 degree phasing. WHP = 1530 psi - no change. Flow well to 555 psia WHP and SI. Monitor PBU. WHP increased 25 psi in 8 hours. 6/7/96 9577' WHP = 568 psig. Blowdown well to atm. SI. 6/8/96 9577' WHP = 3 psig. Blowdown well to atm. SI. 6/9/96 9577' WHP = 2 psig. Blowdown well to atm. SI. Perform pump-in test w/ 3% KCl water at 4.78 bpm, 1.91 bpm 6/11/96 9577' and 1 bpm. Inj. for 2 hours at 1.5 bpm. SI well. 6/12/96 9524' Blowdown well w/ N2. WHP dec to 0 psig. Place 15,400# 20/40 frac sand from 9524' to 8938' 6/13/96 8833' Pressure up 1000 psig on plug. RIH and tag plug at 8938' Blowdown tubing/casing to 7186' RIH w/ PL tools. Tag bottom at 8833' Fluid level at 6865~ Perf 7095-7115' (T3 TI#4) w/ 2-1/2" Hollow Carrier, 6 spf, 180 degree phasing 1250 psi underbalance. WHP inc. 35 psi in 1 hour. Flow well to 1000 psi WHP and SI. WHP inc. 85 psi in 3 hours. UU ':I , ,J._ ...... OPERATION SUMbh%RY REPORT: POST RIG WELL: COREA CREEK FED #1 DATE! RP~. DE~TH MUD WT'. DA~LY. OPERATIONS SUMMARY · · 6/14/96" 8833, ' Flowed well to atm. WHP dec to 0 psi. Produced 0.49 mscf of gas. Run flowing P/T gradient survey. Fluid level at 4391' and increasing at 1.9 bph. 6/15/96 8833' Leave well open to atm. 0 flow. 6/16/96 8833' Run flowing P/T gradient survey. Fluid level at 256' and increasing at 0.8 bph. 6/17/96 8844' Tag sand plug at 8844' Set 6.5 bbls cement from 8844' to 8644' 6/18/96 8644' Tag cement plug at 8644' Blowdown well w/ N2 to 7512'. Flowing well at 12 mscfpd, 0 psig WHP. 6/20/96 8642' Run TDT from 8600 - 5600' Fluid level increased from 6256' to 6182' (1.2 bph inc). 6/21/96 8642' Flowing well at 28 mscfpd, 0 psig WHP. Run flowing P/T gradient survey, followed by 12 hr PBU. Gauges failed. 6/22/96 8642' Run SI P/T gradient survey, 3 hr FBHP, and 6 hr PBU. Fluid level at 3707', increasing 1.6 bph. 6/23/96 8642' Set bridge plug @ 7170' Place 10 bbls cement on top of plug. 6/24/96 6893' PT 1000 psi against cement plug. Good test. Tag cement at 6894' Blowdown well to 6207' w/ N2. Perf 6620-6650 (T2, TI#5) w/ 2-1/2" Hollow Carrier, 6 spf, 60 degree phasing. 'Fag cement at 6893'. WHP increased 40 psi to 1180 in 40 minutes. Blow well down to atm. Well flowing 27 mscfpd at 0 psig. 6/25/96 6893' Run flowing P/T gradient survey. Fluid level at 4565', increasing at 0.9 bph. SI well and secure location. Total of 79.33 mscf of gas produced. 7/9/96 6893' Place 16.5 bbl cement plug to 6470' 7/10/96 6470' ~'T 1000 psi against cement plug. Good test. Tag cement at 6470' Blowdown well to 6248' w/ N2. Perf 5860-5890' (TI, TI#8) w/ 2-1/2" Hollow Carrier, 6 spf, 60 degree phasing. WHP increasing 100 psi/hr from 780 psi. Flow well to atm. Well flowing 12 mscfpd at 0 psig. 7/11/96 6470' Run flowing P/T gradient survey. Fluid level at 2547', increasing at 1.2 bph. Leave well open to arm - well dead. 7/12/96 6153' Tagged fill at 6153' CT plugged. POOH, cleaned cement out of nozzle, RIH. Blowdown well w/ N2. Flowed well to atm. Well dead. SI well and secure location. OPERATION SUMMARY REPORT: POST RIG WELL: ~:OREA CREEK FED #1 DATEi'.' RPT : DEPTH '<MUD WT. DALLY OPERATIONS SUMMARY ~ 8/7/96 6115' Tag fill at ~115' Place 18 t,bl cement plug to 5674' ' ...... 8/8/96 5674' ['T 1100 psi a<.jail'~St cement plug. Good test. Tag cement at 5674' SI well and secure location. Final report. To~al flar~J gas = 83.33 mscf. Marathon Corea Creek Federal #1 Completion Summary Jul-96 Perf. 9320-50'md No recovery S.i. WHP = 1505 psia. Perf. 9125'-35'md & 9105'-9125' md Blew well down to FWHP 0#. Perf. 9086-9101'md,9155' - 9175' md & 9135' - 9155' md Blew well down to FWHP 0#, SIWHP 15.2#, flowed water to surface. Covered with sand plug to 8833' md. Perf. 7095'-7115' md Gas to surface. WHP = 150 psia. WHP continued to 0 as rate decreased to 0 mscfpd. Prod. 1.16 bbl of water. S.I. WHP= 22.75 psia. SlBHP inc. from 2577.8 psia to 2587.2 psia in 1 hr., WHP=0 EST. INFLUX: 0.95 bph Set cmt. plug to 8644'md. Gas rate = 16 mscpfd, WHP= 14 psi and dropping. SBHP = 1771 psia after 6 hrs., WHP = 536 psia. Set cement plug across interval. Perf. 6620'-6650' md Gas to surface @ 27 mscfpd, WHP 20 psi. FBHP@6635' md = 756 psia. EST. INFLUX: 0.87 BWPH S.I. WHP=2100# Static fluid level est. to be between 5207' md and 5664' md Blew down well to zero WHP. Set Cmt. plug across interval to 6442' kb (est.) Perf. 5860'-5890' md. Gas to surface @ 12 mscfpd, WHP 0#. Water influx ~ 1.2 bph S.I. well. COREA CREEK FEDERAL #1 TYONEK FORMATION LEGEND Sandstone Calcareous Sandstone Shale Siltstone Planar to wavy bedding Wispy/organic laminae Shale clasts/ rip-ups Rooted zone possible soil Ripples © 'iFiDFNT!AL MOC COREA CREEK ODRE #1 PAGE[ #1 5825 Micaceous, lith ic Disturbed(?) Wavy laminae 5826 Organic debris Planar laminae Ripples Irreg. laminae 5827 Organic-rich partings Mottle d claysto ne 5828 5828 Shalier part ings Massive 5829 Irreg. laminae 583O Massive Wavy/planar laminae 5831 5831 Planar t o irreg, laminae 5832 Organic debris on laminae 5833 Scour Mort led claysto ne 5834 5834 Parallel laminae 5835 Massive mott led claysto ne 5836 5837 RECEIVED AUG 1 5 !99~ Alaska Oil & I~,a~ C0~. 6~,~i¢ MOO COREA CREEK O:::~E #1 PAGE #2 M F S 5837 Very faint laminae 5838 Sharp contac t Coaly debris I: .""~%-~..' '-'h.' ;b 5839 Rap, ar laminae 5840 5840 Truncated crossbedding Ripples 5841 Faint parallel laminar ions 5842 · Massive mott led _- claysto ne 5843 5843 Missing 5844 Mottle d Planar laminat ions 5845 Organic debris 5846 Mottle d 5847 - Massive claysto ne ! - 5848 Planar laminar ions 5846 5849 ~ CORF_.A CREEK CCRI= #1 PAGE #3 M 5849 Massive claysto ne 585O 5851 5852 5853 Mud clast s Lit hic, clay-rich 5853 Erosional surface(?) 5854 5855 M 5855 Sharp contac t Massive, clay-rich 5856 Rootedzone 5857 Scour Parallel laminar ions 5858 5858 Massive, mottle d, silty 5859 Parallel laminat ions 586O Coal spars 5861 i LJL--~ ~ MOC ~EA CREEK O::~E #1 PAGE #4 M F V S M F V S ~i.~..~ - Organic debris '~ ...... - Or a, c ~ .... ~ - J~ laminat ions ~ .~ Truncat~ beds ~ :~ 5866 laminae 58~4 58fl7 5867 Parallel laminat ions 5868 Calcareous Fine laminae 5869 Parallel laminae Wispy, organic laminat ions 5870 5870 Coal clast Shale clast 5871 Wispy laminat Bott om co re #1 5871.3' 5872 MOC COREA CREEK CQ:;IE #2 PAGE #1 8155 8156 8157 8158 8158 8159 8160 8161 8161 8162 8163 8164 8165 8166 8164 8167 MOC CORF~ CR EE~ 03R E #2 P~__~ E #2 F VI S claysto ne 8168 Planar laminae wit h organic debris Finely laminar ed 8169 8170 8170 Massive 8171 Faint planar t o wavy laminae 8172 Organic debris 8173 , M 8173 .,,,]~,.~._.~.~ _-. 8174 . .,~ .... -. - Shaleclasts :?: ~ .-f-:: ~- 8175 .~.~ ~: .- ::: .-+e.' ~.~.· Wavy laminae 8176 8176 Scour Shale clast 8177 Wispy organic laminat ions 8178 Calcareous cement Coal spars Scour 8179 IVIOC CE~ CRED( OCRE #2 PAGE #3 8179 Laminat ed Core break 8180 Minor shale laminar ions 8181 Si. caicar. Wispy organic part ings 8182 8182 SI. calcar. 8183 Massive t o faint parallel laminar ions 8184 8185 8185 Laminat ed 8186 Shale laminae 8187 Shale laminae 8188 8188 Lam inat ed 8189 Sand int erbeds Flames 8190 Calcareous Shale parting s 8191 MOC CORF_~ CR ~ COR ~' #2 PAC..~ I= #4 iS 8191 Shale parting 8192 Calcareous Planar laminations 8193 Thin shale part ings Calcareous 8194 8194 Shale partings Flames 8195 Organic laminae 8196 Shale partings 8197 M F V! 8197 f Goneralized thin bedded " sands in shale 8198 -- Laminat ed 8199 82OO 82OO Generalized thin bedded sands in shale 8201 Burrow(?) Organic laminae 8202 Organic laminae 8203 Moc COREA CREEK CC:RE #2 PAGI: #5 F VF I 82O3 Laminar ed/ silty Organic laminae 8204 Laminat ed 8205 82O6 F VF 8206 Very organic rich 8207 Laminat ed 82O8 Approaches brown coal 82O9 M F iVF 82O9 Very organic rich 8210 Base core #2 8210' * MEAS. * * * TRUE * COORDINATES * * DOG-LEG * * DEPTH * DEVIATION * AZIMUTH * VERTICAL ********************* COURSE * SEVERITY * * FT * DEGREES * DEGREES * DEPTH * + NORTH * + EAST * LENGTH * . . * * FT * - SOUTH * - WEST * FT * DEG/100FT * ************************************************************************************* * 0.0 * 0.0 * 0 * 0.0 * 0 0 * 0.0 * 0.0 * 0.0 * * 40.0 * 0.4 * 165 * 40.0 * -0 2 * 0.0 * 0.2 * 1.0 * * 50.0 * 0 5 * 171 * 50.0 * -0 2 * 0.0 * 0.2 * 1.9 * * 60.0 * 0 4 * 155 * 60.0 * -0 3 * 0.1 * 0.3 * 4.5 * * 70.0 * 0 2 * 131 * 70.0 * -0 3 * 0.1 * 0.4 * 2.3 * * 80.0 * 0 4 * 334 * 80.0 * -0 3 * 0.1 * 0.3 * 11.4 * * 90.0 * 0 5 * 227 * 90.0 * -0 4 * 0.1 * 0.4 * 6.2 * * 100.0 * 0 3 * 260 * 100.0 * -0 4 * 0.0 * 0.4 * 7.1 * * 110.0 * 0 2 * 116 * 110.0 * -0 4 * 0.0 * 0.4 * 6.5 * * 120.0 * 0 1 * 98 * 120.0 * -0 3 * 0.0 * 0 3 * 13.7 * 130.0 * 0.3 * 184 * 130.0 * -0 4 * 0.0 * 0 4 * 3.1 * 140.0 * 0.3 * 134 * 140 0 * -0 5 * 0.0 * 0 5 * 11.6 * * 150.0 * 0 4 * 68 * 150 0 * -0 4 * 0 1 * 0 4 * 1.0 * 160.0 * 0 4 * 24 * 160 0 * -0 4 * 0 1 * 0 4 * 1.4 * 170.0 * 0 4 * 119 * 170 0 * -0 4 * 0 1 * 0 4 * 5.0 * 180.0 * 0 2 * 208 * 180 0 * -0 4 * 0 2 * 0 4 * 7.5 * * 190.0 * 0 4 * 220 * 190 0 * -0 4 * 0 1 * 0 5 * 1.6 * * 200.0 * 0 4 * 226 * 200 0 * -0 5 * 0 1 * 0 5 * 3.1 * * 210.0 * 0 5 * 66 * 210 0 * -0 5 * 0 1 * 0 5 * 3.3 * * 220.0 * 0 2 * 161 * 220 0 * -0 5 * 0 2 * 0 5 * 8.6 * * 230.0 * 0 5 * 261 * 230 0 * -0 5 * 0 1 * 0 5 * 7.0 * * 240.0 * 0 5 * 193 * 240.0 * -0 5 * 0.0 * 0 5 * 10.1 * * 250.0 * 0 7 * 201 * 250.0 * -0 7 * 0.0 * 0 7 * 2.4 * * 260.0 * 0 7 * 185 * 260.0 * -0 8 * 0.0 * 0 8 * 7.5 * * 270.0 * 0.1 * 109 * 270.0 * -0 8 * 0.0 * 0 8 * 5.4 * * 280.0 * 0.5 * 108 * 280 0 * -0 8 * 0.0 * 0.8 * 3.0 * * 290.0 * 0.4 * 89 * 290 0 * -0 8 * 0.1 * 0.8 * 8.3 * * 300.0 * 0.4 * 127 * 300 0 * -0 9 * 0.2 * 0.9 * 1.0 * * 310.0 * 0.3 * 138 * 310 0 * -0 9 * 0.2 * 0.9 * 1.0 * * 320 0 * 0.4 * 122 * 320 0 * -0 9 * 0.3 * 1 0 * 1.2 * * 330 0 * 0.3 * 125 * 330 0 * -1 0 * 0.3 * 1 0 * 1.0 * * 340 0 * 0.3 * 121 * 340 0 * -1 0 * 0.4 * 1 1 * 0.0 * * 350 0 * 0.3 * 118 * 350 0 * -1 0 * 0.4 * 1 1 * 0.0 * 360 0 * 0.3 * 106 * 360 0 * -1 0 * 0.4 * 1 1 * 3.1 * 370 0 * 0 4 * 144 * 370 0 * -1 1 * 0.5 * 1 2 * 1.4 * * 380 0 * 0 5 * 167 * 380 0 * -1 2 * 0.5 * 1 3 * 1.4 * 390 0 * 0 3 * 174 * 390 0 * -1 2 * 0.5 * 1 3 * 1.6 * * 400 0 * 0 5 * 129 * 400.0 * -1 3 * 0.6 * 1 4 * 1.9 * * 410 0 * 0 6 * 126 * 410.0 * -1.3 * 0.6 * 1 5 * 1.9 * * 420 0 * 0 6 * 126 * 420.0 * -1.4 * 0.7 * 1 6 * 1.0 * * 430 0 * 0 6 * 118 * 430.0 * -1.5 * 0.8 * 1 7 * 0.0 * 440 0 * 0 6 * 114 * 440.0 * -1.5 * 0.9 * 1 8 * 0.0 * * 450.0 * 0 6 * 123 * 450.0 * -1.6 * 1.0 * 1 8 * 0.0 * 460.0 * 0 6 * 124 * 460 '0 * -1 6 * 1 1 * * 470.0 * 0 5 * ' - 1 9 * 0.0 * 121 * 470.0 * -1.7 * 1.2 * 2 0 * 2.0 * ************************************************************************************* RECEIVED AUG 1,5 1996 Alaska 0118, Gas Cons,. Commissio~ Anchorage REF 96100 PAGE 2 * MEAS. * * * TRUE * COORDINATES * * DOG-LEG * * DEPTH * DEVIATION * AZIMUTH * VERTICAL ********************* COURSE * SEVERITY * * FT * DEGREES * DEGREES * DEPTH * + NORTH * + EAST * LENGTH * , * FT * - SOUTH * - WEST * FT * DEG/100FT * ************************************************************************************* * 480.0 * 0 5 * 118 * 480.0 * -1.7 * 1.2 * 2.1 * 1.4 * * 490 0 * 500 0 * 510 0 * 520 0 * 530 0 * 540 0 * 550 0 * 560.0 * 570.0 * 580.0 * 590.0 * 600.0 * 610.0 * 620.0 * 630 . 0 * 640.0 * 650.0 * 660 . 0 * 670.0 * 680.0 * 690.0 * 700.0 * 710 . 0 * 720.0 * 730.0 * 740.0 * 750.0 * 760.0 * 770 0 * 780 0 * 790 0 * 800 0 * 810 0 * 820 0 * 830 0 * 840 0 * 850 0 * 860 0 * 870 0 * 880 0 * 890 0 * 900 0 * 910 0 * 920 0 * 930 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 0.2 0.2 0.2 0.4 0.5 0.5 0.5 0.3 0.4 0.3 0.3 0.1 0.1 0 4 0 5 0 6 0 6 0 6 0 6 0 5 0 4 0 4 0 2 0 4 0 5 0 6 125 * 490.0 135 * 500.0 125 * 510.0 155 * 520.0 166 * 530.0 202 * 540.0 166 * 550.0 156 * 560.0 171 * 570.0 190 * 580.0 196 * 590.0 177 * 600.0 179 * 610 0 164 * 620 0 136 * 630 0 141 * 640 0 147 * 650 0 153 * 660 0 177 * 670 0 185 * 680 0 209 * 690 0 210 * 700 0 190 * 710 0 218 * 720 0 227 * 730.0 231 * 740 . 0 280 * 750.0 240 * 760.0 238 * 770.0 235 * 780.0 148 * 790.0 308 * 800 0 281 * 810 0 275 * 820 0 271 * 830 0 279 * 840 0 268 * 850 0 256 * 860 0 238 * 870 0 262 * 880 0 262 * 890 0 276 * 900.0 278 * 910.0 280 * 920.0 292 * 930.0 -3 -3 -3 -3 -3 -3 -3 -3 -3 -3 -3 -3 * 940 0 * 0 5 * 310 * 940.0 * -3 *************************************************** -1.8 * -1.8 * -1.8 * -1.9 * -1.9 * -1.9 * -20* -20* -21' -22* -23* -24* -25* -25* -26* -27* -27* -27* -2.8 * -2.8 * -2.8 * -2.9 * -2.9 * -3.0 * -3.0 * -3.1 * -3.1 * -3.1 * -3.2 * -3.2 * -3.2 * -3.2 * -32* 2 * 2 * 2 * 2 2 * 2 * 3 * 3 * 3 * 3 * 2 * 2 2 * 1.3 * 1.3' 1.4' 1.4' 1.4' 1.4' 1.4' 1.4' 1.5' 1.5' 1.4' 1.4' 1.4' 1.4' 1.5' 1.5' 1.5' 1.6' 1.6' 1.6' 1.6' 1.6' 1.5 * 1.5' 1.4' 1.4' 1.3' 1.3' 1.2' 1.2' 1.1 * 12' 1 1 * 1 0 * 09* 08* 07* 06* 05* 05* 04* 03* 03* 02* 0 1 * 0 0 * 2.2 * 2.2* 2.3* 2.3* 2.4* 2.4 * 2.4* 2.5* 2.6* 2.6* 27* 28* 28* 29* 30* 31' 31' 32* 32* 32* 32* 33* 33* 33* 34* 34* 34* 34* 34* 34* 34* 34* 34* 34* 33* 33* 33* 33* 33* 33* 33* 33* 33* 32* 32* 32* 1.4 * 0.0 * 1.0 * 0.0 1.0 * 2.9 * 2.5 * 3.8 * 3.7 * 1.2 * 1.2 * 2.5 * 1.0 * 1.9 * 1.6 * 0.0 * 1.0 * 1.0 * 0.7 * 1.0 * 0.7 * 1.4 * 1.6 * 1.2 1.2 * 2.4 * 2.2 * 0.0 * 1.4 * 1.0 * 4.0 * 7.7 * 0.0 1.2 * 3.7 * 2.3 2.1 * 0.0 2.0 0.7 * 1.6 * 4.4 * 3.4 * 1.0 2.8 * 0.0 * * 960 . 0 * * 970 . 0 * * 980.0 * * 990.0 * * 1000 0 * ' PAGE 3 * MEAS. * * * TRUE * COORDINATES · * DOG-LEG * * DEPTH * DEVIATION * AZIMUTH * VERTICAL ********************* COURSE * SEVERITY * * FT * DEGREES * DEGREES * DEPTH * + NORTH * + EAST * LENGTH * . . * * FT * - SOUTH * - WEST * FT * DEG/100FT * ************************************************************************************* * 950.0 * 0.6 * 299 * 950.0 * -3 1 * 0.0 0 * 0 * 0 * 0 * 0 * 0 * 0 * 0 * 0 * 0 * 0 0 * 0 * 0 * 0 * 0 * 0 * 0 * 0 * 0 * * 1010 * 1020 * 1030 * 1040 * 1050 * 1060 * 1070 * 1080 * 1090 * 1100 * 1110 * 1120 * 1130 * 1140 * 1150 * 1160 * 1170 * 1180 * 1190 * 1200 0.6 0.5 0.5 0.5 0.5 0.6 0.7 0.7 0.7 0.7 0.7 0.5 0 5 0 5 0 6 0 6 0 6 0 5 0 5 0 3 0 1 0 4 0.9 1.4 1.8 2.0 2.2 2.2 2.2 2.9 2.6 2 2 2 7 3 4 2 9 3 5 4 1 5 0 3 9 4 7 3 9 1.6 0.7 4.4 4.5 6.4 * 1210 * 1220 * 1230 * 1240 * 1250 * 1260 * 1270 * 1280 * 1290 * 1300 * 1310 * 1320 * 1330 * 1340 * 13S0 * 1360 * 1370 * 1380 * 1390 * 1400 * 1410 288 * 960.0 268 * 970 0 257 * 980 0 255 * 990 0 277 * 1000 0 286 * 1010 0 281 * 1020 0 282 * 1030 0 291 * 1040 0 278 * 1050 0 267 * 1060 0 268 * 1070 0 262 * 1080 0 288 * 1090 0 293 * 1100 0 270 * 1110 0 277 * 1120 0 285 * 1130 0 287 * 1140 0 258 * 1150.0 343 * 1160.0 56 * 1170.0 57 * 1180 0 45 * 1190 0 59 * 1200 0 55 * 1210 0 62 * 1219 9 61 * 1229 9 74 * 1239 9 75 * 1249 9 78 * 1259 9 86 * 1269 9 56 * 1279 9 50 * 1289 9 56 * 1299 9 81 * 1309 8 118 * 1319 8 131 * 1329 8 163 * 1339.8 112 * 1349.7 115 * 1359.7 84 * 1369.7 342 * 1379.7 63 * 1389.7 69 * 1399.6 -31' -31' -31' -31' -31' -31' -31' -30* -30* -30* -30* -30* -30 * -30* -30* -29* -2.9 -2.9 * -2.9 * -2.9 * -2.9 -2.9 * -2.8 * -2.7 * -2.5 * -2.3 * -2.1 * -20* -1 8 * -17' -16' -16' -14' -1 1 * -07* -05* -07* -1.2 * -1.8 * -2.1 -2.4 * -2.8 * -2.8 * -2.5 -2.1 * -0.1 * -0.2 * -0.3 * -0.4 * -0.5 * -0.6 * -0.7 * -0.8 * -0.9 * -1.1 * -1.2 * -1.3 * -1.4 * -1.5 * -1.6 * -1.7 * -1.8 * -1.8 * -1.9 -2.0 * -2.0 * -2.0 * -1.9 * -1.7 * -1.5 -1.2 * -0.9 * -0.6 * -0.3 * 0.2* 0.7* 1 0 * 14' 18' 22* 28* 34* 40* 45* 50* 57* 60* 62* 66* 73* 3.1 * 3.1' 3.1' 3.1' 3.1' 3.1' 3.1' 3.1' 3.1' 3.2* 3.2 * 3.2 * 3.2* 3.3* 3.3* 3.3* 34* 34* 35* 35* 35* 35* 35* 34* 3.2* 2.9* 2.6* 2.3* 2.0* 3.0 3.1 2.3 0.7 2.0 2.2 1.0 0.7 0.7 1.9 0.0 4.1 1.7 2.0 0.0 1.0 0.0 0.0 2.2 3.0 2.8 2.6 4.9 5.3 4.9 5.5 3.6 5.2 6.1 83 * 1409.6 * -1.9 * 8 2 * ************************************************************** 1.8 * ll.1 1.7 * 3.0 1.8 * 27.9 1.9 * 49.2 2.0 * 15.7 21 * 28.2 23 * 26.2 2 9 * 45.8 4 * 29.5 2 * 18.4 9 * 33.3 4 * 56.7 2 * 33.2 6 * 42.5 8 * 47.5 1 * 23.2 6 * 30.1 5 * 44.2 * 1430 * 1440 * 1450 * 1460 * 1470 * 1480 * 1490 * 1500 * 1510 * 1520 · PAGE ************************************************************************************* * MEAS. * * * TRUE * COORDINATES . * DOG-LEG * DEPTH * DEVIATION * AZIMUTH * VERTICAL ********************* COURSE * SEVERITY * * FT * DEGREES * DEGREES * DEPTH * + NORTH * + EAST * LENGTH * FT * - SOUTH * - WEST * FT * DEG/100FT ************************************************************************************* * 1420.0 * 6.2 * 81 * 1419 5 * -1.8 * 9.4 * 9.5 * 23.1 * * 1530 * 1540 * 1550 * 1560 * 1570 * 1580 * 1590 * 1600 * 1610 * 1620 7.1 7.0 7 2 7 2 9 0 8 8 9 0 6 8 8 1 9 1 0 * 10.7 0 * 62 0 * 68 0 * 42 0 * 10 1 0 * 38 0w 54 0 * 70 0 * 61 0 * 22 * 1630 0 * 3 0 * 1640.0 * 4 9 * 1650.0 * 7 2 * 1660.0 * 7 7 * 1670.0 * 6 1 * 1680 0 * 5 3 * 1690 0 * 4 4 * 1700 0 * 5 8 0 * 10 0 * 9 0 * 12 0 * 12 0 * 14 0 * 7 0 * 5 0 * 12 0 * 9 0 * 7 0 * 5 0 * 10 0 * 10 0 * 7 0 * 3 0 * 6 0 * 5 * 1710 * 1720 * 1730 * 1740 * 1750 * 1760 * 1770 * 1780 * 1790 * 1800 * 1810 * 1820 * 1830 * 1840 * 1850 * 1860 * 1870 8 2 0 1 1 6 6 9 7 6 8 3 1 4 2 1 9 6 2 * 1880 74 * 1429 5 82 * 1439 4 98 * 1449 3 123 * 1459 2 115 * 1469 1 127 * 1479.0 143 * 1488.9 161 * 1498.8 121 * 1508.7 90 * 1518 6 71 * 1528 4 115 * 1538 3 134 * 1548 2 113 * 1558 2 125 * 1568 1 140 * 1578 0 81 * 1588 0 81 * 1597 9 95 * 1607 8 17 * 1617 8 290 * 1627 8 282 * 1637 8 282 * 1647 7 277 * 1657 6 22 * 1667 5 25 * 1677 5 41 * 1687 4 36 * 1697 4 61 * 1707 3 124 * 1717 2 138 * 1727 0 117 * 1736 8 114 * 1746 6 106 * 1756 4 103 * 1766 3 -1.5 * -1.1 * -1.1 * -1.7 -2.4 * -3.1 * -4.2 -5.6 * -6.6 * -7.0 * -6.6 * -6.5 * -70* -74* -80* -94* -94* -87* -89* -91. -92* -88* -85* -84* -79* -69* -60* -6.0 * -5 2 * -5 3 * -6 5 * -80* -9 0 * -95* -99* 82 * 1776 91 * 1786 104 * 1795 209 * 1805 73 * 1815 99 * 1825 52 * 1835 75 * 1845 92 * 1855 3 * 2 * -10 0 * -9 9 * -9 8 * -10 7 * -10 5 * -10 4 * -10 4 * -10 -9 10.5 * 10.6 * 10.9 11.7 * 11.8 * 52.2 12.9 * 12.9 * 82.9 14.1 * 14.2 * 19.2 15.3 * 15.5 * 13.5 16.7 * 16.9 * 47.0 17.7 * 18.2 * 50.9 18.2 * 19.1 * 34.7 18.8 * 20.0 * 150.7 20.3 * 21.5 * 73.9 22.0 * 23.0 * 22.6 23.5 * 24.4 * 52.0 24.4 * 25.4 * 26.7 25.1 * 26.1 * 24.4 26.0 * 27.3 * 102.3 26.9 * 28.5 * 147.0 27.4 * 29.0 * 117.5 28 6 * 29.9 * 104.2 29 7 * 31.0 * 11.8 30 3 * 31.6 * 107.4 30 3 * 31.6 * 116.3 29 7 * 31.0 * 57.2 28 6 * 29.9 * 51.8 27 3 * 28.5 * 89.6 26.9 * 28.0 * 75.5 27.3 * 28.1 * 54.0 27.6 * 28.2 * 189.2 28.1 * 28.7 * 90.0 29.3 * 29.8 * 36.4 30.8 * 31.2 * 100.9 32.3 * 32.9 * 192.8 33.0 * 34 0 * 180.9 67 * 1865.2 * -9.4 * 35 . 1 * 36 37.0 * 38 37.8 * 39 1 * 39.2 * 40 8 * 41.3 * 42 9 * 42 . 8 * 43 4 * 43.7 * 44 9 * 44.0 * 45 9 * 46 . 2 * 47 5 * 47.5 * 48 0 * 48 . 2 * 49 7 * 49.0 * 50 2 * 27.0 2 * 74.1 1 * 72.5 4 * 134 . 8 4 * 52.2 9 * 58.5 9 * 147 . 3 4 * 143 . 8 4 * 113.1 6 * 72.0 2 * 49.4 0 * 41.8 50.3 * 51.1 * 89.7 76 * 1875.2 * -9.2 * 51.1 * 52.0 * 17.9 * ************************************************************************************* * 1890.0 * 5.2 * 1900 0 * 13.3 * 1910 * 1920 * 1930 * 1940 * 1950 * 1960 * 1970 * 1980 * 1990 * 2000 0 * 7 * 2010 0 * 8 REF 96100 ~i Ii,i:- l; 1',- *** , *********************************** * MEAS. * * * TRUE * COORDINATES * * DOG-LEG * * DEPTH * DEVIATION * AZIMUTH * VERTICAL ********************* COURSE * SEVERITY * * FT * DEGREES * DEGREES * DEPTH * + NORTH * + EAST * LENGTH * , * * * * FT * - SOUTH * - WEST * FT * DEG/100FT * ************************************************************************************* * 124 * 1885.2 * -9.2 * 51.9 * 52.7 * 71.4 0 * 7.6 0 * 6.4 0 * 4.0 0 * 13.5 0 * 11.9 0 * 9.9 0 * 9.5 0 * 14.5 0 * 93 8 8 0 * 177 0 * 10 0 0 * 95 0 * 145 0 * 103 0 * 106 0 * 93 0 * 91 0 * 164 0 * 146 0 * 105 0 * 14.4 0 * 11.2 0 * 3.5 0 * 3.0 0 * 11.5 0 * 16.9 0 * 15.1 0 * 10.6 0 * 12.8 0 * 15.2 0 * 4.4 0 * 8.4 0 * 16.3 0 * 21.7 0 * 18.1 0 * 6.9 0 * 15.2 0 * 12.2 0 * 9.4 0m 3.3 0 * 10.1 0 * 21.7 * 2020 * 2030 * 2040 * 2050 * 2060 * 2070 * 2080 * 2090 * 2100 * 2110 * 2120 * 2130 * 2140 * 2150 * 2160 * 2170 * 2180 * 2190 * 2200 * 2210 * 2220 * 2230 * 2240 * 2250 * 2260 * 2270 * 2280 * 2290 * 2300 * 2310 * 2320 * 2330 * 2340 58 * 1895.0 * 89 * 1904.8 * 68 * 1914.7 * 132 * 1924 7 * 77 * 1934 79 * 1944 84 * 1954 112 * 1964 48 * 1973 80 * 1983 126 * 1993 134 * 2003 179 * 2013 5 * 3 * 1 0 * 7 * 5 5 * 3 * 0 * -8.7 * -8.2 * -8.0 * -7.8 -7.5 * -7.2 * -6.9 * -73* -63* -54* -58* -69* -92* 120 * 2022 34 * 2032 48 * 2042 5 40 * 2052 3 54 * 2062 1 62 * 2072 0 26 * 2081 9 46 * 2091 5 49 * 2101 0 72 * 2110 8 173 * 2120.6 144 * 2130.3 63 * 2140.2 3 * 2150.2 303 * 2160.1 309 * 2169.7 275 * 2179 4 191 * 2189 1 266 * 2198 9 249 * 2208 5 157 * 2218 4 122 * 2228 3 101 * 2238 0 91 * 2247 5 100 * 2256 9 117 * 2266 6 117 * 2276 4 96 * 2286 0 82 * 2295 9 199 * 2305.8 188 * 2315.7 300 * 2325.4 8 * -10.7 * 7 * -10.8 -9.0 * -8.1 * -6.9 * -6.3 * -5.4 * -3.4 * -1.0 * 0 1 * -12' -35 * -35* -3 1 * -20* -09* 04* -02* -18' -22* -29* -34* -41' -41' -48* -4.9 * -55* -61' -61' -61' -73* -8 9 * 53.6 * 54.2 * 93.2 55.3 * 55.9 * 54.8 56.6 * 57.1 * 86.8 57.0 * 57.6 * 153.4 58.6 * 59.1 * 38.7 60.6 * 61.1 * 33.9 62.8 * 63.1 * 107.9 64.2 * 64.6 * 64.2 66.0 * 66.3 * 131.5 67.7 * 67.9 * 86.5 68.9 * 69.1 * 120.4 70.1 * 70.5 * 30.4 70.8 * 71.4 * 125.6 71.8 * 72.6 * 97.6 72.6 * 73.4 * 131.9 74.0 * 74.5 * 83.9 75.2 * 75.7 * 70.8 76.8 * 77.1 * 26.6 78.1 * 78.4 * 150.7 79.5 * 79.7 * 184.2 81.2 * 81.3 * 34.4 83.4 * 83.4 * 223.3 84.9 * 84.9 * 146.7 86.1 * 86.1 * 97.8 86.7 * 86.8 * 343.8 88.0 * 88.0 * 80.8 88.3 * 88.4 * 86.5 87.5 * 87.5 * 146.5 85.2 * 85.3 * 49.4 83.0 * 83.0 * 124.0 80.9 * 80.9 * 166.9 80.2 * 80.2 * 212.8 77.6 * 77.6 * 86.5 76.5 * 76.5 * 141.3 77.4 * 77.5 * 127.9 79.6 * 79.7 * 85.0 82.9 * 83.0 * 119.5 86.1 * 86.2 * 203.9 88.5 * 88.6 * 82.8 90.0 * 90.2 * 100.3 92.7 * 92.9 * 96.6 94.5 * 94.7 * 23.4 95.5 * 95.7 * 80.5 95.8 * 96.0 * 101.3 94.3 * 94.7 * 419.8 * 2350 0 * 15.6 * 209 * 2334.9 * -9 7 * 92.1 * 92.6 * 65.2 * ************************************************************************************* REF 96100 ..... ~ PAGE 6 ************************************************************************************* * MEAS. * * * TRUE * COORDINATES * * DOG-LEG * * DEPTH * DEVIATION * AZIMUTH * VERTICAL ********************* COURSE * SEVERITY * * FT * DEGREES * DEGREES * DEPTH * + NORTH * + EAST * LENGTH * * * * * * FT * - SOUTH * - WEST * FT * DEG/100FT * ************************************************************************************* * 2360.0 * 21.8 * 274 * 2344 2 * -10.1 * 89.0 * 89 6 * 169.9 * * 2370 0 * 21.4 * 248 * 2353 6 * -11.1 * 85.9 * 86 6 * 160.7 * * 2380 0 * 25.6 * 271 * 2362 9 * -11.3 * 82.1 * 82 9 * 58.7 * * 2390 0 * 25.8 * 265 * 2371 9 * -11.2 * 77.8 * 78 6 * 88.9 * 2400 0 * 25.2 * 264 * 2380 9 * -11.4 * 73.6 * 74 4 * 390.5 * * 2410 0 * 24.5 * 233 * 2390 0 * -14.1 * 70.5 * 71 9 * 344.4 * * 2420 0 * 25.9 * 247 * 2399 1 * -15 2 * 66.4 * 68 1 * 36.8 * 2430 0 * 24.2 * 262 * 2408 1 * -16 0 * 62.2 * 64 3 * 31.4 * * 2440 0 * 24.5 * 217 * 2417 3 * -17 8 * 58.7 * 61.3 * 110.1 * * 2450 0 * 23.2 * 262 * 2426 4 * -20 2 * 55.6 * 59.2 * 390.3 * * 2460 0 * 19 8 * 299 * 2435 7 * -19 2 * 52.1 * 55.5 * 80.0 * * 2470 0 * 16 3 * 275 * 2445 2 * -17 9 * 49 3 * 52.5 * 237.9 * 2480 0 * 17 9 * 206 * 2454 9 * -19 1 * 47 3 * 51.0 * 196.9 * * 2490 0 * 5 3 * 56 * 2464 7 * -20 5 * 46 7 * 51.0 * 217.2 * * 2500 0 * 4 2 * 134 * 2474 6 * -21.1 * 47 9 * 52.3 * 163.4 * * 2510 0 * 8 3 * 79 * 2484 5 * -20.9 * 49 3 * 53.6 * 106.5 * * 2520 0 * 7 3 * 185 * 2494 3 * -21.6 * 50 6 * 55.1 * 212.4 * * 2530 0 * 14 4 * 95 * 2504 2 * -22.4 * 51 7 * 56.4 * 138.1 * * 2540 0 * 14 0 * 87 * 2514 0 * -22.0 * 53 7 * 58.1 * 142.9 * * 2550 0 * 15 9 * 102 * 2523 6 * -22.5 * 56 3 * 60.7 * 67.1 * * 2560 0 * 20 0 * 182 * 2533 2 * -23.9 * 58 4 * 63.1 * 431.5 * * 2570 0 * 27 8 * 251 * 2542 7 * -26.0 * 56 0 * 61.8 * 453.1 * * 2580 0 * 28 6 * 306 * 2551 5 * -24.4 * 51 8 * 57.2 * 56.9 * * 2590 0 * 28 9 * 313 * 2560 2 * -21.3 * 48 1 * 52.6 * 17.8 * * 2600 0 * 28 9 * 316 * 2569 0 * -17.9 * 44 6 * 48.1 * 15.4 * * 2610 0 * 28.9 * 316 * 2577 7 * -14.4 * 41 3 * 43.7 * 12.8 * * 2620 0 * 28 8 * 315 * 2586 5 * -11.0 * 37 9 * 39.4 * 7.5 * * 2630 0 * 28 7 * 316 * 2595 3 * -7 5 * 34 5 * 35.4 * 2.6 * * 2640 0 * 28 8 * 317 * 2604 0 * -4 0 * 31.2 * 31.5 * 2.3 * * 2650 0 * 28 9 * 317 * 2612 8 * -0 5 * 27.9 * 27.9 * 4.1 * * 2660 0 * 28 6 * 317 * 2621 6 * 3 0 * 24.7 * 24.8 * 4.2 * * 2670 0 * 28 5 * 317 * 2630 4 * 6 5 * 21.4 * 22.4 * 1.0 * * 2680 0 * 28 8 * 317 * 2639 1 * 10 0 * 18 1 * 20 7 * 0.0 * * 2690 0 * 28 7 * 317 * 2647 9 * 13 5 * 14 9 * 20 1 * 1.4 * * 2700 0 * 28 5 * 317 * 2656 7 * 17 0 * 11 6 * 20 6 * 4.8 * 2710 0 * 28 3 * 317 * 2665.5 * 20 5 * 8 4 * 22 1 * 1.4 * 2720 0 * 28 3 * 317 * 2674.3 * 24 0 * 5 1 * 24 5 * 4.3 * * 2730 0 * 28 6 * 317 * 2683 1 * 27 5 * 1 9 * 27 5 * 3.0 * * 2740 0 * 28 3 * 317 * 2691 9 * 31 0 * -1 4 * 31 0 * 2.1 * * 2750 0 * 28 4 * 317 * 2700 7 * 34 4 * -4 6 * 34 7 * 2.2 * * 2760 0 * 28 3 * 317 * 2709 5 * 37 9 * -7 8 * 38 7 * 2.7 * * 2770 0 * 28 1 * 317 * 2718 3 * 41 3 * -11 0 * 42 8 * 5.3 * * 2780 0 * 28 4 * 318 * 2727 1 * 44 8 * -14.2 * 47 0 * 7.0 * * 2790 0 * 27 9 * 318 * 2735 9 * 48,3 * -17.4 * 51.3 * 3.5 * * 2800 0 * 27 9 * 318 * 2744 8 * 51.8 * -20.5 * 55.7 * 3.6 * * 2810 0 * 28 3 * 318 * 2753.6 * 55.3 * -23.7 * 60.2 * 1.4 * * 2820 0 * 28 0 * 318 * 2762.4 * 58.8 * -26.8 * 64.6 * 6.1 * ************************************************************************************* RE~ 96100 ~Ui~t tUi i~!~i/41 ~E 7 * MEAS. * * * TRUE * COORDINATES * * DOG-LEG * * DEPTH * DEVIATION * AZIMUTH * VERTICAL ********************* COURSE * SEVERITY * FT * DEGREES * DEGREES * DEPTH * + NORTH * + EAST * LENGTH * * * * * * FT * - SOUTH * - WEST * FT * DEG/100FT ************************************************************************************* * 2830.0 * 27.8 * 318 * 2771 2 * 62.3 * -29.9 * 69 1 * 3.2 * * 2840 0 * 28.1 * 318 * 2780 1 * -65.8 * -33.1 * 73 6 * 4.9 * * 2850 0 * 27.6 * 318 * 2788 9 * 69'.2 * -36.2 * 78 1 * 3.9 * * 2860 0 * 27 7 * 318 * 2797 8 * 72.7 * -39.3 * 82 6 * 4.0 * * 2870 0 * 27 6 * 318 * 2806 6 * 76.1 * -42.5 * 87 2 * 1.2 * * 2880 0 * 27 5 * 318 * 2815 5 * 79.5 * -45.6 * 91 7 * 1.2 * * 2890 0 * 27 7 * 318 * 2824 3 * 83.0 * -48.7 * 96.2 * 1.0 * * 2900 0 * 27 6 * 318 * 2833 2 * 86.4 * -51.8 * 100.7 * 0.0 * * 2910 0 * 27 6 * 318 * 2842.1 * 89.8 * -54.9 * 105.3 * 1.0 * * 2920 0 * 27 5 * 317 * 2850.9 * 93.2 * -58.0 * 109.8 * 1.4 * * 2930 0 * 27.6 * 318 * 2859.8 * 96.7 * -61.2 * 114.4 * 6.1 * * 2940 0 * 27 5 * 317 * 2868 7 * 100.1 * -64.3 * 118 9 * 4.6 * * 2950 0 * 27 1 * 317 * 2877 6 * 103.4 * -67.4 * 123 5 * 1.9 * * 2960 0 * 27 3 * 317 * 2886 4 * 106.8 * -70.5 * 128 0 * 4.0 * * 2970 0 * 27 2 * 317 * 2895 3 * 110.2 * -73 6 * 132 5 * 4.9 * * 2980 0 * 27 1 * 317 * 2904 2 * 113.5 * -76 7 * 137 0 * 6.9 * * 2990 0 * 27 1 * 317 * 2913 1 * 116.9 * -79 8 * 141 5 * 4.6 * * 3000 0 * 26 8 * 318 * 2922 1 * 120.2 * -82 8 * 146 0 * 2.0 * * 3010 0 * 27 0 * 317 * 2931 0 * 123.5 * -85 9 * 150 4 * 8.1 * 3020 0 * 27 1 * 317 * 2939 9 * 126.9 * -89 0 * 155 0 * 4.2 * * 3030 0 * 26 8 * 317 * 2948 8 * 130.2 * -92 1 * 159 4 * 2.8 * * 3040 0 * 26 9 * 316 * 2957 7 * 133.5 * -95 1 * 163 9 * 9.3 * * 3050 0 * 26 4 * 315 * 2966 7 * 136.6 * -98 3 * 168 3 * 3.5 * * 3060 0 * 26 4 * 315 * 2975.6 * 139.8 * -101 4 * 172.7 * 1.6 * * 3070 0 * 26 5 * 315 * 2984.6 * 142.9 * -104.6 * 177 1 * 0.7 * * 3080 0 * 26.3 * 315 * 2993.5 * 146.0 * -107.8 * 181 5 * 1.0 * 3090 0 * 26.1 * 314 * 3002.5 * 149.1 * -110.9 * 185 9 * 2.0 * * 3100 0 * 26.0 * 314 * 3011.5 * 152.2 * -114 1 * 190 2 * 1.6 * * 3110 0 * 26.2 * 314 * 3020.5 * 155.3 * -117 3 * 194 6 * 1.2 * * 3120 0 * 26.1 * 314 * 3029..4 * 158 3 * -120 4 * 198 9 * 0.7 * * 3130 0 * 26.3 * 314 * 3038 4 * 161 4 * -123 6 * 203 3 * 3.4 * 3140 0 * 26.2 * 314 * 3047 4 * 164 5 * -126 8 * 207 7 * 7.0 * * 3150 0 * 25 8 * 314 * 3056 4 * 167 5 * -130 0 * 212.0 * 0.0 * * 3160 0 * 25 8 * 314 * 3065 4 * 170 5 * -133 1 * 216 3 * 6.2 * * 3170 0 * 26 0 * 315 * 3074 4 * 173 6 * -136 2 * 220 6 * 2.0 * * 3180 0 * 26 1 * 315 * 3083 4 * 176 7 * -139 3 * 225 0 * 4.2 * 3190 0 * 26 0 * 316 * 3092 3 * 179 8 * -142 4 * 229 4 * 1.9 * 3200 0 * 25 8 * 316 * 3101.3 * 183 0 * -145 4 * 233 7 * 0.0 * * 3210 0 * 25 7 * 316 * 3110.3 * 186 1 * -148 4 * 238 0 * 2.4 * * 3220 0 * 25 9 * 316 * 3119.4 * 189 3 * -151 4 * 242.4 * 3.5 * * 3230 0 * 25 9 * 316 * 3128.3 * 192 4 * -154 4 * 246.7 * 1.9 * 3240 0 * 25.7 * 316 * 3137.4 * 195 5 * -157 5 * 251.0 * 0.7 * * 3250 0 * 25.6 * 316 * 3146.4 * 198 6 * -160 5 * 255.3 * 1.6 * * 3260 0 * 25.6 * 316 * 3155.4 * 201 7 * -163 5 * 259.7 * 0.0 * * 3270 0 * 25.6 * 316 * 3164.4 * 204.8 * -166 5 * 264.0 * 2.0 * 3280 0 * 25.5 * 316 * 3173.4 * 207.9 * -169 5 * 268.3 * 1.6 * * 3290 0 * 25.5 * 314 * 3182.4 * 211.0 * -172 6 * 272.6 * 15.2 * ************************************************************************************* REF 96100 PAGE 8 ************************************************************************************* * MEAS. * * * TRUE * COORDINATES * * DOG-LEG * * DEPTH * DEVIATION * AZIMUTH * VERTICAL ********************* COURSE * SEVERITY * FT * DEGREES * DEGREES * DEPTH * + NORTH * + EAST * LENGTH * * * * * * FT * - SOUTH * - WEST * FT * DEG/100FT * ************************************************************************************* * 313 * 3191 5 * 213.9 * -175.7 * 276.8 * 7.0 * 3300.0 * 25 4 * 3310.0 * 25 * 3320.0 * 25 * 3330 0 * 25 0 * 25 0 * 26 0 * 26 0 * 27 0 * 277 0 * 28.0 0 * 280 0* 279 0* 280 0 * 283 * 3340 * 3350 * 3360 * 3370 * 3380 * 3390 * 3400 * 3410 * 3420 * 3430 * 3440 0 * 28 * 3450.0 * 28 * 3460 0 * 28 0 * 28 0 * 28 0 * 28 0 * 29 0 * 28 0 * 28 0 * 29 0 * 29 0 * 29 0 * 29 0 * 29 0 * 29 0 * 29 0 * 29 0 * 29 0 * 30 0 * 30 0 * 30 0 * 30 0 * 30 0 * 30 0 * 29 0 * 29 0 * 29 0 * 30 0 * 29 0 * 29 0 * 30 0 * 30 * 315 * 3200 * 315 * 3209 * 313 * 3218 * 313 * 3227 * 314 * 3236 * 316 * 3245 * 317 * 3254 * 317 * 3263 * 319 * 3272 * 318 * 3281 * 317 * 3289 * 316 * 3298 * 317 * 3307 * 319 * 3316 * 319 * 3325 * 317 * 3333 * 317 * 3342 * 317 * 3351 * 318 * 3360 * 319 * 3369 * 319 * 3377 * 317 * 3386 * 317 * 3395 * 318 * 3404 * 319 * 3412 * 317 * 3421 * 318 * 3430 * 320 * 3438 * 319 * 3447 * 317 * 3456 * 317 * 3464 * 318 * 3473 * 319 * 3482 * 320 * 3490 * 318 * 3499 * 317 * 3508 * 317 * 3516 * 316 * 3525 * 316 * 3534 * 317 * 3542 * 317 * 3551 * 315 * 3560 * 315 * 3568 * 315 * 3577 * * 3470 * 3480 * 3490 * 3500 * 3510 * 3520 * 3530 * 3540 * 3550 * 3560 * 3570 * 3580 * 3590 * 3600 * 3610 * 3620 * 3630 * 3640 * 3650 * 3660 * 3670 * 3680 * 3690 * 3700 * 3710 * 3720 * 3730 * 3740 * 3750 5 * 216.9 * -178.7 * 281.1 * 6.4 5 * 219.9 * -181.8 * 285.3 * 13.4 6 * 222.9 * -184.9 * 289.6 * 1.6 6 * 225.8 * -188.0 * 293.8 * 7.6 7 * 228.8 * -191.1 * 298.1 * 13.1 6 * 231 9 * -194.3 * 302.5 * 8.4 5 * 235 2 * -197.4 * 307.1 * 4.9 4 * 238 6 * -200.6 * 311.7 * 5.1 2 * 242 1 * -203.7 * 316.4 * 5.1 0 * 245 6 * -206.8 * 321.1 * 5.2 9 * 249 1 * -210.0 * 325.8 * 4.0 7 * 252 5 * -213.2 * 330 5 * 3.3 5 * 255 9 * -216.4 * 335 3 * 259 4 * -219.6 * 339 1 * 263 1 * -222.8 * 344 9 * 266 6 * -225.9 * 349 7 * 270 1 * -229.2 * 354 5 * 273 5 * -232.5 * 359 2 * 277 1 * -235.7 * 363 0 * 280 7 * -238.9 * 368 7 * 284 4 * -242.1 * 373 5 * 288 0 * -245.3 * 378 3 * 291 5 * -248.6 * 383 0 * 295.1 * -251.9 * 388 7 * 298 7 * -255.2 * 392 4 * 302 1 * 306 8 * 309 5 * 313 2 * 317 9 * 320 6 * 324 2 * 328 9 * 332 5 * 335 1 * 339 8 * 343 5 * 346 2 * 350 8 * 353 5 * 357 2 * 361 8 * 364 5 * 368.2 * -319.3 * 487 4 * -258.4 * 397 0 * -261.8 * 402 7 * -265.0 * 407 5 * -268.2 * 412.6 * 12.9 2* 5.0 9* 9.5 7* 1.7 5 * 10.4 2* 2.4 0 * 2.0 8* 7.9 6* 5.2 5* 9.0 3* 4.4 1 * 4.5 0 * 7.9 9* 1.0 8* 5.6 7* 9.5 6* 2.0 1 * -271.6 * 417 5 * 8 * -274 9 * 422 3 * 427 6 * 432 9 * 437 2 * 442 6 * 447 1 * 452 5 * 457 0 * 462 4 * 467 8 * 472 4 * -278 2 * -281 0 * -284 8 * -288 5 * -291 1 * -295 7 * -298 3 * -302 9 * -305 5 * -308 1.4 5* 4.3 4* 7.7 4* 8.4 5* 3.6 5* 8.4 5* 2.6 6* 6.2 5* 7.1 5* 4.3 4* 6.7 4* 4.5 4* 6.8 4* 3.7 3 * 4.4 1 * -312.3 * 477 6 * -315.8 * 482 316 * 3586 1 * 371.7 * -322.9 * 492 4 * 4.6 · 3760 0 * 30 2 * 316 * 3594 8 * 375.4 * -326.3 * 497 4 * 4.1 * ************************************************************************************* 'RECEIVED AUG 1,5 199g ~,laska Oil & Gas Co~s ~,;omm~sio. REF 96100 ...... PAGE 9 ************************************************************************************* * MEAS. * * * TRUE * COORDINATES * * DOG-LEG * * DEPTH * DEVIATION * AZIMUTH * VERTICAL ********************* COURSE * SEVERITY * * FT * DEGREES * DEGREES * DEPTH * + NORTH * + EAST * LENGTH * * * * * * FT * - SOUTH * - WEST * FT * DEG/100FT ************************************************************************************* * 3770.0 * 30.4 * 317 * 3603.4 * 379 0 * -329.8 * 502.4 * 1.7 * 3780 0 * 30.6 316 * 3612.0 * 382 7 * -333.3 * 507.5 * 10.4 315 * 3620 7 * 386 4 * -336.8 * 512.6 * 2.5 * 3790 * 3800 * 3810 * 3820 * 3830 * 3840 * 3850 * 3860 * 3870 * 3880 * 3890 * 3900 * 3910 * 3920 * 3930 * 3940 * 3950 * 3960 * 3970 * 3980 * 3990 * 4000 * 4010 * 4020 * 4030 * 4040 0 * 30.3 0 * 30.4 0 * 30.7 0 * 30.7 0 * 30.9 0 * 31.1 0 * 31.3 0 * 31.1 0 * 31.3 0 * 31.5 0 * 31.3 0 * 31.7 0 * 31.9 0 * 31.9 0 * 31.7 0 * 31.7 0 * 31.5 0 * 31.4 0 * 30.8 0 * 30.0 0 * 300 0 * 299 0 * 299 0 * 300 0 * 302 0 * 302 * 4050 0 * 30.2 * 4060.0 * 30.7 * 4070 0 * 30.3 * 4080 * 4090 * 4100 * 4110 * 4120 * 4130 * 4140 * 4150 * 4160 * 4170 * 4180 * 4190 * 4200 * 4210 * 4220 * 4230 0 * 30.2 0 * 30.4 0 * 30.6 0 * 30.7 0 * 30.5 0 * 30.7 0 * 31.1 0 * 31.0 0 * 31.2 0 * 31.4 0 * 31.2 0 * 31.2 0 * 31.1 0 * 30.8 0 * 30.6 0 * 30.9 315 * 3629 315 * 3637 316 * 3646 317 * 3655 317 * 3663 317 * 3672 3 * 389 9 * -340.4 * 517.6 * 8.2 9 * 393 5 * -344.0 * 522.7 * 4.3 5 * 397 1 * -347.6 * 527.8 * 10.1 1 * 400 9 * -351.1 * 532.9 * 1.0 7 * 404.7 * -354.6 * 538.0 * 4.8 2 * 408.5 * -358.1 * 543.2 * 12.8 315 * 3680.8 * 412.2 * -361.7 * 548.4 * 1.0 316 * 3689 3 * 415.9 * -365.3 * 553.6 * 10.2 318 * 3697 315 * 3706 315 * 3714 317 * 3723 317 * 3731 317 * 3740 317 * 3748 317 * 3757 317 * 3766 318 * 3774 316 * 3783 318 * 3791 317 * 3800 317 * 3809 8 * 419.7 * -368.9 * 558.8 * 0.0 4 * 423.5 * -372.5 * 564.0 * 12.4 9 * 427.2 * -376.2 * 569.2 4 * 431.0 * -379.8 * 574.5 9 * 434.9 * -383.4 * 579.7 4 * 438 8 * -386 9 * 585 0 9 * 442 5 * 590 3 4 * 446 1 * 595 5 0 * 450 6 * 600 7 5 * 454 1 * 605 9 2 * 457 6 * 610 9 8 * 461 4 * -408 5 * 465 1 * -411 2 * 468 7 * -414 6 * -390 4 * -394 2 * -397 0 * -401 7 * -404 7.7 6.5 1.6 2.1 1.2 1.2 4.7 3.2 6.3 0 * ' 615.9 * 10.2 4 * 620.9 * 14.1 8 * 625.9 * 7.9 318 * 3817.8 * 472.4 * -418.1 * 630.9 * 8.1 317 * 3826.5 * 476 1 * -421.5 * 635.9 * 15.6 316 * 3835.1 * 479 317 * 3843.8 * 483 318 * 3852.4 * 487 317 * 3861.0 * 491 317 * 3869 6 * 494 317 * 3878 3 * 498 317 * 3886 9 * 502 316 * 3895 5 * 505 316 * 3904 1 * 509 8 * -425.0 * 640.9 4 * -428.4 * 645.9 2 * -431.8 * 651 0 0 * -435.2 * 656 1 6 * -438.6 * 661 1 3 * -442.1 * 666 1 0 * -445.5 * 671 2 7 * -449 1 * 676 3 4 * -452 6 * 681 4 7.4 1.2 7.6 6.5 1.2 2.2 3.8 2.6 0.7 6.2 3.1 7.4 3.3 316 * 3912 7 * 513.1 * -456 1 * 686 5 318 * 3921.3 * 516 8 * -459 6 * 691 6 * 318 * 3929.9 * 520 6 * -463 1 * 696 8 * 319 * 3938.4 * 524 5 * -466 5 * 701 9 * 318 * 3947.0 * 528 4 * -469 9 * 707 2 * 13.3 316 * 3955.5 * 532 2 * -473 5 * 712 3 * 1.2 316 * 3964.1 * 536 0 * -477.1 * 717.5 * 1.0 317 * 3972.6 * 539 7 * -480.6 * 722.7 * 7.0 316 * 3981.2 * 543.4 * -484.2 * 727.8 * 3.6 317 * 3989.8 * 547.1 * -487.7 * 732.9 * 0.0 317 * 3998.4 * 550.8 * -491.2 * 738.0 * 2.2 REF 96100 PAGE 10 ************************************************************************************* * MEAS. * * * TRUE * COORDINATES * * DOG-LEG * * DEPTH * DEVIATION * AZIMUTH * VERTICAL ********************* COURSE * SEVERITY * * FT * DEGREES * DEGREES * DEPTH * + NORTH * + EAST * LENGTH * * * * * * FT * - SOUTH * - WEST * FT * DEG/100FT * ************************************************************************************* * 317 * 4007.0 * 554 6 * -494 7 * 743.1 * * 4240.0 * 30.7 * 4250 0 * 30.4 * 4260 0 * 30.4 * 4270 0 * 30.6 * 4280 0 * 30.4 * 4290 0 * 30.2 * 4300 0 * 30.3 * 4310.0 * 30.5 * 4320.0 * 30.4 * 4330.0 * 30.6 * 4340.0 * 30.5 * 4350 0 * 30.6 0 * 30.7 0 * 30.8 0 * 31.0 0 * 309 0 * 309 0 * 311 0 * 312 0 * 312 0 * 316 0 * 31.8 0 * 31.9 0 * 32.2 0 * 31.9 0 * 31.6 0 * 31.9 0 * 31.8 0 * 31.3 0 * 31.3 0 * 31.4 0 * 31.5 0 * 31.1 0 * 30.9 0 * 31.0 0 * 308 0 * 305 0 * 302 0 * 297 0 * 297 0 * 295 0 * 296 0 * 297 0 * 299 0 * 301 0 * 302 0 * * * * 317 * 4041 * 317 * 4050 * 318 * 4058 * 319 * 4067 * 318 * 4076 * 319 * 4084 * 319 * 4093 * * * 320 * 4119 * 319 * 4127 * 318 * 4136 * 318 * 4144 * 318 * 4153 * 318 * 4161 * 317 * 4170 * 317 * 4179 * 317 * 4187 * 318 * 4196 * 319 * 4204 * 320 * 4213 * 320 * 4221 * 319 * 4230 * 319 * 4238 * 319 * 4247 * 319 * 4255 * 319 * 4264 * 319 * 4272 * 318 * 4281 * 318 * 4289 * 317 * 4298 * 317 * 4306 * 317 * 4315 * 318 * 4324 * 316 * 4332 * 318 * 4341 * 316 * 4350 * 316 * 4358 * 317 * 4367 * 318 * 4376 * 318 * 4384 * 316 * 4393 * 316 * 4402 * 4360 * 4370 * 4380 * 4390 * 4400 * 4410 * 4420 * 4430 * 4440 * 4450 * 4460 * 4470 * 4480 * 4490 * 4500 * 4510 * 4520 * 4530 * 4540 * 4550 * 4560 * 4570 * 4580 * 4590 * 4600 * 4610 * 4620 * 4630 * 4640 * 4650 * 4660 * 4670 * 4680 * 4690 * 4700 0 * 30 317 * 4015.6 * 558 317 * 4024.2 * 562 317 * 4032 8 * 565 5 * 569 1 * 573 7 * 576 4 * 580 0 * 584 6 * 588 2 * 592 317 * 4101.9 * 595 318 * 4110 5 * 599 3 * -498 0 * -501 7 * -505 4 * -508 1 * -512 8 * -515 6 * -518 4 * -522 2 * -525 3.0 2 * 748.2 * 0.0 6 * 753.3 * 0.0 1 * 758.3 * 4.8 5 * 763.4 * 2.4 0 * 768.5 * 6.2 4 * 773.5 * 6.0 7 * 778.6 * 6.1 0 * 783.6 * 4.3 4 * 788.7 * 7.6 0 * -528.7 * 793.8 * 10.4 8 * -532.1 * 798.8 * 5.3 6 * -535 5 * 803.9 * 7.2 0 * 603 4 * -538 6 * 607 3 * -542 2 * 611.2 * -545 8 * 615 0 * -549 4 * 618 9 * 622 5 * 626 0 * 630 5 * 634 0 * 638 5 * 641 0 * 646 5 * 650 0 * 654 5 * 658 0 * 662 5 * 665 1 * 669 6 * 673 2 * 677 7 * 681 3 * 685 9 * 689 5 * 692 1 * 696 8 * 700 5 * 703 1 * 707 8 * 710 5 * 714 2 * 718 9 * 721 5 * 725 2 * 729 8 * -552 6 * -556 4 * -559 2 * - 563 1 * - 566 0 * -570 9 * -573 0 * -577 0 * -580 0 * -584 0 * -587 0 * -590 9 * -594 8 * -597 8 * -601 6 * -604 5 * -608 2 * -611 0 * -'615 7 * -618 5 * -621 1 * -625 8 * -628 4 * -632 9 * -635 5 * -638 2 * -642 9 * -645 6 * -648 9 * 809 0 * 2* 8142' 7 * 819 3 * 1 * 824 4 * 6 * 829 6 1 * 834 8 * 6 * 839 9 1 * 845.1 7 * 850.4 3 * 855.7 * 8 * 861.0 * 2 * 866.3 * 6 * 871.6 0 * 876.8 * 5 * 882.1 * 9 * 887.3 * 2 * 892.5 6 * 897.7 * 6.8 9.4 2.5 1.2 3 4 2 2 2 0 4 6 1 9 7 8 9 6 5.8 2.0 3.6 2.1 2.0 0.0 2.9 0 * 902.9 * 13.6 5 * 908.1 * 13.4 0 * 913.3 * 13.9 5 * 918.4 0 * 923.5 5 * 928.6 9 * 933.7 3 * 938.7 6 * 943.6 0 * 948.6 4 * 953.5 8 * 958.5 2 * 963.4 5 * 968.4 9 * 973.5 2 * -652.4 * 978.5 1.4 4.5 3 6 5 1 2 2 2 0 6 7 7 5 0.0 6.8 5.7 6.8 5.0 REF 96100 ...... PAGE 11 ************************************************************************************* * MEAS. * * * TRUE * COORDINATES * * DOG-LEG * * DEPTH * DEVIATION * AZIMUTH * VERTICAL ********************* COURSE * SEVERITY * * FT * DEGREES * DEGREES * DEPTH * + NORTH * + EAST * LENGTH * * * * * * FT * - SOUTH * - WEST * FT * DEG/100FT * ************************************************************************************* * 4710.0 * 30 3 * 4720 0 * 30 5 0 * 305 0 * 306 0 * 306 0 * 307 0 * 31.0 0 * 307 0 * 307 0 * 308 0 * 311 0 * 313 0 * 312 0 * 313 0 * 314 0 * 313 0 * 312 0 * 314 0 * 312 0 * 311 0 * 308 0 * 304 0 * 302 0 * 304 0 * 306 0 * 307 0 * 309 0 * 311 0 * 314 0 * 314 0 * 314 0 * 31.3 0 * 31.2 0 * 31.4 0 * 31.1 0 * 31.2 0 * 31.1 0 * 31.1 0 * 309 0 * 311 0 * 307 0 * 302 0 * 307 0 * 307 0 * 307 0 * 306 6 316 * 4410 8 * * 4730 * 4740 * 4750 * 4760 * 4770 * 4780 * 4790 * 4800 * 4810 * 4820 * 4830 * 4840 * 4850 * 4860 * 4870 * 4880 * 4890 * 4900 * 4910 * 4920 * 4930 * 4940 * 4950 * 4960 * 4970 * 4980 * 4990 * 5000 * 5010 * 5020 * 5030 * 5040 * 5050 * 5060 * 5070 * 5080 * 5090 * 5100 * 5110 * 5120 * 5130 * 5140 * 5150 * 5160 * 5170 0 * 30 * 317 * 4419 * 318 * 4428 * 317 * 4436 * 316 * 4445 * 316 * 4453 * 318 * 4462 * 316 * 4471 * 316 * 4479 * 316 * 4488 * 317 * 4496 * 317 * 4505 * 318 * 4513 * 318 * 4522 * 318 * 4531 * 318 * 4539 * 318 * 4548 * 318 * 4556 * 318 * 4565 * 318 * 4573 * 319 * 4582 * 319 * 4590 * 318 * 4599 * 318 * 4608 * 318 * 4616 * 317 * 4625 * 318 * 4634 * 319 * 4642 * 320 * 4651 * 320 * 4659 * 320 * 4668 * 319 * 4676 * 319 * 4685 * 319 * 4693 * 319 * 4702 * 319 * 4710 * 320 * 4719 * 320 * 4728 * 320 * 4736 * 321 * 4745 * 320 * 4753 * 319 * 4762 * 320 * 4771 * 321 * 4779 * 321 * 4788 * 320 * 4796 * 319 * 4805 732.8 * -655 9 * 983.5 * 10.0 4 * 1 * 740 7 * 744 3 * 747 9 * 751 5 * 755 0 * 758 6 * 762 736 5 * -659 3 * -662 1 * -666 7 * -669 4 * -673 1 * -676 4 * 988.5 * 5.6 8 * 993.6 * 1.2 2 * 998.7 * 10.0 7 * 1003.8 * 1.2 2 * 1008.9 * 2.0 8 * 1014.0 * 10.1 9 * -680.3 * 1019.2 * 9.4 6 * -683.8 * 1024.3 * 0.7 2 * 766 8 * 770 3 * 773 9 * 777 4 * 781 0 * 785 5 * 789 1 * 793 6 * 796 2 * 800 7 * 804 3 * 808 9 * 812 5 * 816 2 * 819 3 * -687.4 * 1029.4 * 0 * -690.9 * 1034.5 * 8 * -694.4 * 1039.7 * 7 * -697.9 * 1044 9 * 5 * -701 4 * 1050 3 * - 704 2 * -708 0 * -711 8 * -715 7 * -718 5 * - 722 4 * -725 3 * -729 0 * -732 8 * -735 9 * 1055 4 * 1060 9 * 1065 4 * 1070 9 * 1076 3 * 1081 7 * 1086 1 * 1091 4 * 1096 8 * 1101 * * * * * * * 4.1 * 4.0 * 0.7 * 1.0 * 1 * 0.7 * 3* 3.0 * 5* 1.4 * 7* 1.9 * 9* 1.9 * 1 * 2.5 * 2* 8.2 * 4* 6.4 * 5* 6.7 * 5* 3.3 * 6* 0.7 * 6* 3.0 * 7 * 1.2 * 9* 6.3 * 0 * 8.1 * 2* 2.8 * 4* 0.7 * 6* 0.0 * 8* 2.8 * 0 * 1.4 * 2* 3.3 * 4* 3.0 * 6* 0.7 * 7* 2.6 * 9* 3.1 * 0 * 3.0 2* 0.0 * 3 * 8 . 2 * 4* 4.5 * 4* 6.6 * 5* 7.3 * 6* 7.1 * 7* 5.0 * 8* 2.8 8 * 823.5 * -739 4 * 827.3 * -742 0 * 831.0 * -746 6 * 834.9 * -749 1 * 838.9 * -752 6 * 842 9 * -756 2 * 846 7 * 850 3 * 854 8 * 858 3 * 862 9 * 866 5 * 870 0 * 874 6 * 878 2 * 882 7 * 886 4 * 890 0 * 894 6 * 898 2 * 901 8 * 905 4 * 909 9 * -759 8 * -763 8 * -766 7 * -769 6 * -773 5 * - 776 5 * -779 4 * -783 4 * -786 4 * -789 3 * -793 2 * -796 0 * -799 0 * -802 9 * -806 9 * -809 8 * -812 2 * 1106 7 * 1111 1 * 1116 5 * 1122 9 * 1127 2 * 1132 6 * 1137 0 * 1142 3 * 1148 7 * 1153 1 * 1158 5 * 1163 9 * 1168 2 * 1173 5 * 1179 8 * 1184 0 * 1189 3 * 1194 6 * 1199 9 * 1204 1 * 1209 3 * 1214 6 * 1219 * MEAS. * * * TRUE * COORDINATES * * DOG-LEG * * DEPTH * DEVIATION * AZIMUTH * VERTICAL ********************* COURSE * SEVERITY * * FT * DEGREES * DEGREES * DEPTH * + NORTH * + EAST * LENGTH * * * * * * FT * - SOUTH * - WEST * FT * DEG/100FT * ************************************************************************************* * 5180 0 * 30.9 * 319 * 4814 0 * 913.6 * -816 0 * 1224 9 * 3.2 * 5190 * 5200 * 5210 * 5220 * 5230 * 5240 * 5250 * 5260 * 5270 * 5280 * 5290 * 5300 * 5310 * 5320 * 5330 * 5340 * 5350 * 5360 * 5370 * 5380 * 5390 * 5400 * 5410 * 5420 * 5430 * 5440 * 5450 * 5460 * 5470 * 5480 * 5490 * 5500 * 5510 * 5520 * 5530 * 5540 * 5550 * 5560 * 5570 * 5580 * 5590 * 5600 * 5610 * 5620 * 5630 0 * 31.2 0 * 31.6 0 * 31.5 0 * 31.4 0 * 31.6 0 * 31.4 0 * 31.4 0 * 31.8 0 * 32.1 0 * 31.9 0 * 31.5 0 * 31.4 0 * 316 0 * 315 0 * 315 0 * 318 0 * 319 0 * 318 0 * 316 0 * 31.6 0 * 31.7 0 * 31.9 0 * 31.6 0 * 31.7 0 * 32.1 0 * 31.6 0 * 31.3 0 * 31.3 0 * 31.3 0 * 31.5 0 * 31.7 0 * 31.4 0 * 31.4 0 * 31.5 0 * 31.1 0 * 31.2 0 * 31.4 0 * 31.3 0 * 316 0 * 318 0 * 314 0 * 317 0 * 318 0 * 314 0 * 31.2 * 5640 0 * 31.3 * 319 * 4822 * 321 * 4831 * 320 * 4839 * 320 * 4848 * 321 * 4856 * 319 * 4865 * 319 * 4873 * 319 * 4882 * 321 * 4890 * 321 * 4899 * 320 * 4907 * 320 * 4916 * 320 * 4924 * 320 * 4933 * 319 * 4941 * 319 * 4950 * 320 * 4958 * 319 * 4967 * 319 * 4975 * 319 * 4984 * 319 * 4992 * 320 * 5001 * 320 * 5009 * 321 * 5018 * 321 * 5026 * 322 * 5035 * 321 * 5043 * 320 * 5052 * 319 * 5061 * 319 * 5069 * 319 * 5078 * 321 * 5086 * 321 * 5095 * 321 * 5103 * 320 * 5112 * 320 * 5120 * 320 * 5129 * 321 * 5137 * 322 * 5146 * 322 * 5154 * 322 * 5163 * 321 * 5171 * 321 * 5180 * 321 * 5188 * 321 * 5197 * 321 * 5206 6 * 917 5 * -819 1 * 921 5 * -822 6 * 925 6 * -826 1 * 929 5 * -829 7 * 933 6 * -832 2 * 937 6 * -836 7 * 941.6 * -839 2 * 945 . 5 * -842 7 * 949.6 * -846 2 * 953.7 * -849 7 * 957.8 * -852 2 * 961.8 * -856 8 * 965.8 * -859 3 * 969 8 * -863 8 * 973 3 * 977 8 * 981 3 * 985 8 * 989 3 * 993 9 * 997 4 * 1001 9 * 1005 4 * 1009 9 * 1013 4 * 1018 9 * 1022 7 * -866 7 * -869 7 * -873 7 * -876 7 * -880 7 * -883 7 * -886 7 * -890 7 * -893 8 * -897 9 * - 900 0 * - 903 1 * - 906 4 * 1230 7 * 1235 0 * 1240 4 * 1245 7 * 1251 0 * 1256 4 * 1261 8 * 1266 2 * 1271 5 * 1277 9 * 1282 2 * 1287 6 * 1292 0 * 1298 4 * 1303 8 * 1308 2 * 1313 7 * 1319 1 * 1324 5 * 1329 9 * 1334 3 * 1340 7 * 1345 0 * 1350 4 * 1356 7 * 1361 9 * 1366 4 * 1026 0 * 1030 5 * 1034 0 * 1038 5 * 1042 1 * 1046 6 * 1050 2 * 1054 7 * 1058 1 * -910.3 * 1371 0 * -913 6 * 1376 0 * - 917 0 * -920 0 * - 923 0 * - 927 1 * -930 1 * - 933 0 * -937 0 * 1382 5 * 1387 8 * 1392 1 * 1397 4 * 1402 7 * 1408 0 * 1413 3 * 1062.0 * -940 8 * 1066 0 * -943 4 * 1070 9 * 1074 4 * 1078 9 * 1082 4 * 1086 9 * 1090 5 * 1094 0 * 1098 0 * -947 1 * -950 3 * - 953 3 * - 956 5 * -960 5 * -963 6 * - 966 6 * -969 4 * 1418 7 * 1423 0 * 1428 2 * 1434 5 * 1439 8 * 1444 0 * 1449 3 * 1455 6 * 1460 8 * 1465 1 * 6.7 * 3 * 11.5 * 5 * 15.4 * 8 * 12.1 * 0 * 3.2 * 2* 7.1 * 4* 2.4 * 7* 6.2 * 9* 9.9 * 2* 6.8 * 5* 4.7 * 7* 1.2 * 9* 1.9 * 2* 1.7 * 4* 1.4 * 6* 3.6 * 9* 4.9 * 2* 2.4 * 4* 1.4 * 7* 3.3 * 9* 0.0 * 2* 5.9 * 5* 3.1 * 7* 2.6 * 0 * 5.7 * 3* 8.0 * 5* 9.4 * 6* 2.0 * 8* 4.7 * 0 * 3.3 * 3* 4.0 * 5* 4.7 * 7* 9.1 * 9 * 14.0 * 1 * 1.4 * 3* 4.7 * 5* 4.8 * 7* 8.4 * 9* 2.8 * 1 * 0.0 * 4* 3.3 * 6* 2.1 * 8* 2.0 * 1 * 6.4 * 3* 2.0 * 4* 1.9 * ' PAGE 13 ************************************************************************************** * MEAS. * * * TRUE * COORDINATES * * DOG~LEG * DEPTH * DEVIATION * AZIMUTH * VERTICAL ********************* COURSE * SEVERITY * FT * DEGREES * DEGREES * DEPTH * + NORTH * + EAST * LENGTH * * * * * FT * - SOUTH * - WEST * FT * DEG/100FT * ************************************************************************************* * 321 * 5214.6 * 1102.6 * -973.1 * 1470 6 * 321 * 5223 1 * 1106 6 * -976.4 * 1475 8 * 5650 0 * 31.2 * 5660 0 * 31.3 * 5670 0 * 31.5 * 5680 0 * 31.2 * 5690 0 * 31.3 * 5700 0 * 31.3 * 5710 0 * 31.3 * 5720.0 * 31.2 * 5730 0 * 31.1 0 * 31.3 0 * 31.3 0 * 31.1 0 * 31.3 0 * 311 0 * 310 0 * 311 0 * 310 0 * 311 0 * 312 0 * 310 0 * 311 0 * 30.8 0 * 302 0 * 302 0 * 300 0 * 300 0 * 299 0 * 297 0 * 299 0 * 299 0 * 299 0 * 301 0 * 302 0 * 302 0 * 302 0 * 300 0 * 304 0 * 307 0 * 305 0* 301 0 * 302 0* 299 0 * 29.7 0 * 29.9 0 * 30.0 0 * 29.9 * 5740 * 5750 * 5760 * 5770 * 5780 * 5790 * 5800 * 5810 * 5820 * 5830 * 5840 * 5850 * 5860 * 5870 * 5880 * 5890 * 5900 * 5910 * 5920 * 5930 * 5940 * 5950 * 5960 * 5970 * 5980 * 5990 * 6000 * 6010 * 6020 * 6030 * 6040 * 6050 * 6060 * 6070 * 6080 * 6090 * 6100 * 6110 0 * 29.6 321 * 5231 321 * 5240 321 * 5248 321 * 5257 321 * 5265 321 * 5274 321 * 5282 321 * 5291 321 * 5300 322 * 5308 322 * 5317 322 * 5325 6 * 1110 2 * 1114 7 * 1118 3 * 1122 8 * 1126 4 * 1130 9 * 1134 5 * 1138 0 * 1143 6 * 1147 1 * 1151 7 * 1155 322 * 5334 3 * 1159 321 * 5342 321 * 5351 322 * 5360 321 * 5368 321 * 5377 321 * 5385 320 * 5394 318 * 5402 320 * 5411 8 * 1163 4 * 1167 0 * 1171 5 * 1175 1 * 1179 7 * 1183 2 * 1187 8 * 1191 5 * 1195 319 * 5420.1 * 1198 7 * -979.7 * 1481 7 * -983.0 * 1486 8 * -986.2 * 1491 8 * -989 5 * 1496 8 * -992 9 * -996 9 * -999 9 * -1002 0 * -1005 1 * -1009 0 * 2 * 4 * 6 * 8 * 1501 8 * 0 * 1507 0 * 3 * 1512.1 * 5 * 1517.3 * 8 * 1522.5 * 0 * 1527.7 * 1 * -1012.2 * 1532.9 2 * -1015.4 * 1538.0 2 * -1018.6 * 1543 2 2 * -1021.9 * 1548 3 3 * -1025.1 * 1553 5 3 * -1028.3 * 1558 6 4 * -1031.5 * 1563 8 4 * -1034.7 * 1568 9 4 * -1037.9 * 1574 1 4 * -1041.2 * 1579 3 2 * -1044.6 * 1584.3 0 * -1047.9 * 1589.4 8 * -1051.1 * 1594.4 319 * 5428.8 * 1202.6 * -1054.4 * 1599.4 * 318 * 5437.5 * 1206 3 * -1057.7 * 1604.4 * 318 * 5446.1 * 1210 318 * 5454.8 * 1213 318 * 5463.5 * 1217 318 * 5472.2 * 1221 318 * 5480.8 * 1224 318 * 5489 5 * 1228 318 * 5498 318 * 5506 319 * 5515 320 * 5524 321 * 5532 321 * 5541 320 * 5549 320 * 5558 320 * 5567 320 * 5575 320 * 5584 320 * 5593 319 * 5601 0 * -1061.1 * 1609.3 7 * -1064.4 * 1614.3 4 * -1067.7 * 1619 3 1 * -1071.1 * 1624 8 * -1074.4 * 1629 6 * -1077.8 * 1634 1 * 1232.3 * -1081.1 * 1639 8 * 1236 0 * -1084.5 * 1644 4 * 1239 1 * 1243 7 * 1247 3 * 1251 9 * 1255 6 * 1259 2 * 1263 9 * 1266 6 * 1270 8 * -1087.8 * 1649 6 * -1091.1 * 1654 5 * -1094.3 * 1659 5 * -1097.5 * 1664 4 * -1100.8 * 1669 2 * -1104.0 * 1674 1 * -1107.2 * 1679 9 * -1110.3 * 1684 7 * -1113.5 * 1689 2 * 1274.5 * -1116.7 * 1694 9 * 1278.3 * -1120.0 * 1699 3 * 3 * 3 * 3 * 3 * 4 * 5 * 6 * 6 * 6 * 6 * 6 * 5 * 5 * 5 * 319 * 5610.6 * 1282.0 * -1123.2 * 1704 5 * ************************************************************************************* 2.7 * 5.0 * 3.0 1.7 * 1.9 * 0.0 0.7 * 2.6 * 1.6 * 1.7 * 2.1 * 2.1 * 1.7 * 2.5 * 1.0 1.2 * 1.6 * 3.8 * 4.9 * 0.0 * 6.0 9.3 * 2.2 5.4 * 5.5 * 2.4 * 3.4 * 1.7 * 2.3 * 1.4 * 2.2 * 1.7 * 0.7 * 2.6 * 3.8 * 8.3 * 7.2 * 1.0 * 2.5 * 2.9 1.2 * 4.0 * 1.2 * 1.0 * 5.1 * 2.4 * 3.1 * * 6120.0 * 29 5 * 6130 0 * 29 REF 96100 .- PAGE 14 ****************************************----***************************************** * MEAS. * * * TRLTE * COORDINATES * * DOG-LEG * * DEPTH * DEVIATION * AZIMUTH * VERTICAL ********************* COURSE * SEVERITY * * FT * DEGREES * DEGREES * DEPTH * + NORTH * + EAST * LENGTH * * * * * * FT * - SOUTH * - WEST * FT * DEG/100FT * ************************************************************************************* * 319 * 5619 3 * 1285 7 * -1126 5 * 1709 4 * 2.3 0 * 29 0 * 29 0 * 29 0 * 29 0 * 29 0 * 29.2 0 * 29.6 0 * 29.5 0 * 29.4 0 * 29.5 0 * 292 0 * 290 0 * 293 0 * 292 0 * 291 0 * 292 0 * 292 0 * 293 0 * 292 0 * 292 0 * 290 0* 289 0 * 290 0 * 288 0 * 28.7 0 * 28.9 * 6140 * 6150 * 6160 * 6170 * 6180 * 6190 * 6200 * 6210 * 6220 * 6230 * 6240 * 6250 * 6260 * 6270 * 6280 * 6290 * 6300 * 6310 * 6320 * 6330 * 6340 * 6350 * 6360 * 6370 * 6380 * 6390 * 6400 0 * 29.1 * 6410.0 * 29.1 * 6420.0 * 29.1 * 6430 0 * 28.9 0 * 28.6 0 * 287 0 * 288 0 * 288 0 * 289 0 * 289 0 * 287 0 * 284 0 * 285 0 * 284 0 * 286 0 * 284 0 * 283 0 * 284 0 * 284 * 320 * 5628 * 319 * 5636 * 318 * 5645 * 318 * 5654 * 318 * 5662 * 319 * 5671 * 319 * 5680 * 320 * 5689 * 320 * 5697 * 320 * 5706 * 320 * 5715 * 320 * 5723 * 321 * 5732 * 321 * 5741 * 321 * 5750 * 321 * 5758 * 321 * 5767 * 321 * 5776 * 321 * 5784 * 321 * 5793 * 321 * 5802 * 320 * 5811 * 320 * 5819 * 319 * 5828 * 319 * 5837 * 320 * 5846 * 321 * 5854 * 322 * 5863 * 322 * 5872 * 322 * 5881 * 322 * 5889 * 322 * 5898 * 322 * 5907 * 322 * 5916 ~ 322 * 5924 * 321 * 5933 * 321 * 5942 * 321 * 5951 * 321 * 5960 * 320 * 5968 * 320 * 5977 * 320 * 5986 * 319 * 5995 * 320 * 6004 * 320 * 6012 * 320 * 6021 * 6440 * 6450 * 6460 * 6470 * 6480 * 6490 * 6500 * 6510 * 6520 * 6530 * 6540 * 6550 * 6560 * 6570 * 6580 0 * 1289 7 * 1293 4 * 1296 2 * 1300 9 * 1304 6 * 1307 3 * 1311 0 * 1315 7 * 1319 4 * 1322 1 * 1326 8 * 1330 5 * 1334 3 * 1337 0 * 1341 7 * 1345 5 * 1349 2 * 1353 9 * 1356 7 * 1360 4 * 1364 1 * 1368 9 * 1371 6 * 1375 4 * 1379 1 * 1382 9 * 1386 6 * 1390 4 * 1394 1 * 1398 9 * 1401 6 * 1405 4 * 1409 2 * 1413 9 * 1417 7 * 1420 5 * 1424 2 * 1428 0 * 1432 8 * 1435 6 * 1439 4 * 1443 2 * 1446 0 * 1450 8 * 1453 6 * 1457 4 * -1129 1 * -1133 8 * -1136 4 * -1139 1 * -1142 9 * -1145 6 * -1149 3 * -1152 1 * -1155 8 * -1158 6 * -1161 4 * -1165 1 * -1168 9 * -1171 7 * -1174 4 * -1177 2 * -1180 0 * -1183 8 * -1186 5 * -1189 3 * -1192 1 * -1195 8 * -1198 5 * -1202 1 * -1205 8 * -1208 5 * -1211 3 * -1214 2 * -1217 0 * -1220 8 * -1223 6 * -1226 4 * -1229 2 * -1232 0 * -1235 7 * -1238 5 * -1241 2 * - 1244 0 * - 1247 6 * -1250 3 * -1253 0 * -1256 6 * -1259 2 * -1262 8 * -1265 5 * -1268 7 * 1714 0 * 1719 2 * 1724 5 * 1729 7 * 1733 9 * 1738 2 * 1743 4 * 1748 5 * 1753 7 * 1758 9 * 1763 0 * 1768 1 * 1773 2 * 1778 3 * 1783 4 * 1787 5 * 1792 5 * 1797 6 * 1802 7 * 1807 7 * 1812 8 * 1817 3* 1.9 2* 1.7 1 * 2.0 0 * 1.0 9 * 22.4 9 * 24.7 8 * 11.0 7* 1.6 6* 1.6 5* 2.0 5* 2.7 4* 4.1 2* 2.2 1 * 00 0 * 54 8* 07 7* 0 0 6* 23 5 * 3 1 3* 1.4 2* 3.4 1 * 5.8 9 * 1821.9 1 * 1826.7 3 * 1831.6 4 * 1836.4 5 * 1841.2 5 * 1846 1 5 * 1850 9 5 * 1855 8 4 * 1860 6 4 * 1865 4 4 * 1870 2 3 * 1875 0 3 * 1879 8 3 * 1884 6 3 * 1889 5 3 * 1894 3 3 * 1899 0 4 * 1903 8 4 * 1908 6 4 * 1913 3 6 * 1918 1 6 * 1922 8 7 * 1927 6 8 * 1932 4 2.4 5.5 5.9 4.1 5.0 6.8 1.7 2.7 3.0 1.2 2.7 1.6 1.7 4.5 1.7 0.0 2.2 2.0 2.0 7.7 4.4 3.0 0.0 0.7 RECEIVED ,AUG 1 5 199G Oil & (~as Cons. Anchorage * 6590.0 * 28 4 * 6600 0 * 28 5 REF 96100 ~ PAGE 15 ************************************************************************************* * MEAS. * * * TRUE * COORDINATES * * DOG-LEG * * DEPTH * DEVIATION * AZIMUTH * VERTICAL ********************* COURSE * SEVERITY * * FT * DEGREES * DEGREES * DEPTH * + NORTH * + EAST * LENGTH * * * * * * FT * - SOUTH * - WEST * FT * DEG/100FT * ************************************************************************************* * 320 * 6030 4 * 1461 1 * -1271 9 * 1937.1 * 0 * 285 0 * 286 0 * 288 0 * 286 0 * 28.7 0 * 28.4 0 * 28.1 0 * 28.1 0 * 28.1 0* 281 0 * 283 0 * 284 0 * 285 0 * 286 0 * 286 0 * 284 0 * 279 0 * 281 0 * 282 0 * 281 0 * 282 0 * 281 0 * 281 0 * 28.1 * 6610 * 6620 * 6630 * 6640 * 6650 * 6660 * 6670 * 6680 * 6690 * 6700 * 6710 * 6720 * 6730 * 6740 * 6750 * 6760 * 6770 * 6780 * 6790 * 6800 * 6810 * 6820 * 6830 * 6840 * 6850 0 * 28.1 * 6860.0 * 27.9 * 6870.0 * 27.9 * 6880.0 * 27.5 * 6890.0 * 27.5 * 6900.0 * 27 4 * 6910.0 * 27 3 * 6920.0 * 27 4 * 6930 0 * 27 4 0 * 273 0* 273 0 * 273 0 * 27.3 0 * 27.1 0 * 26.8 0 * 26.7 0 * 26.7 0 * 26.7 0 * 26.9 0 * 27.1 * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * 6940 * 6950 * 6960 * 6970 * 6980 * 6990 * 7000 * 7010 * 7020 * 7030 * 7040 320 * 6039 321 * 6047 321 * 6056 322 * 6065 322 * 6074 322 * 6083 321 * 6091 320 * 6100 320 * 6109 2 * 1464 7 * -1274 9 * 1468 4 * -1277 7 * 1472 1 * -1281 5 * 1475 9 * -1283 3 * 1479 7 * -1286 1 * 1483 5 * -1289 8 * 1487.2 * -1292 6 * 1490.8 * -1295 5 * 1494.4 * -1298 321 * 6118.3 * 1498.1 * -1301 321 * 6127 1 * 1501.8 * -1304 322 * 6135 322 * 6144 323 * 6153 323 * 6162 323 * 6171 322 * 6179 321 * 6188 321 * 6197 321 * 6206 322 * 6215 322 * 6224 322 * 6232 322 * 6241 9 * 1505 7 * 1509 5 * 1513 3 * 1516 1 * 1520 9 * 1524 7 * 1528 5 * 1531 3 * 1535 2 * 1539 0 * 1542 8 * 1546 6 * 1550 322 * 6250.4 * 1554 323 * 6259.2 * 1557 323 * 6268.1 * 1561 323 * 6276.9 * 1565 323 * 6285.8 * 1569 5 * -1307 2 * -1310 0 * -1313 9 * -1316 7 * -1319 5 * -1322 2 * -1325 8 * -1328 5 * -1331.0 * 2032 2 * -1334.0 * 2036 9 * -1336.9 * 2041 6 * -1339.7 * 2046 4 * -1342.6 * 2050 1 * -1345.5 * 2055 8 * -1348.3 * 2060 6 * -1351.2 * 2065 3 * -1354.0 * 2069 0 * -1356.8 * 2074 323 * 6294.6 * 1572.7 * -1359.6 * 2078 323 * 6303.5 * 1576 3 * -1362.4 * 2083 323 * 6312.4 * 1580 324 * 6321.3 * 1583 324 * 6330 324 * 6339 324 * 6347 324 * 6356 323 * 6365 323 * 6374 323 * 6383 321 * 6392 322 * 6401 321 * 6410 322 * 6419 2 * 1587 0 * 1591 9 * 1594 8 * 1598 7 * 1602 6 * 1605 5 * 1609 5 * 1613 4 * 1616 3 * 1620 2 * 1623 0 * -1365 2 * 2088 7 * -1367 4 * -1370 1 * -1373 9 * -1376 6 * -1378 2 * -1381 9 * -1384 5 * -1386 1 * -1389 6 * -1392 1 * -1395 6 * -1398 9 * 1941 9 * 9 * 1946 0 * 1951 9 * 1956 9 * 1961 8 * 1965 8 * 1970 9 * 1975 9 * 1980 9 * 1984 8 * 1989 7 * 1994 6 * 1998 5 * 2003 4 * 2008 3 * 2013 2 * 2018 1 * 2022 0 * 2027 6 4 2 0 8 6 3 0 7 4 2 9 7 4 2 0 7 4 1 8 5 2 9 6 3 0 7 3 9 5 1 9 * 2092 7 6 * 2097 3 3 * 2101 8 0 * 2106 4 7 * 2111 0 4 * 2115 5 1 * 2120 1 9 * 2124 6 6 * 2129 1 4 * 2133 6 2 * 2138.1 0 * 2142.6 323 * 6428 2 * 1627 2 * -1400 8 * 2147.1 * 4.2 · 7050 0 * 26.8 * 323 * 6437 1 * 1630 8 * -1403 6 * 2151.6 * 9.1 ************************************************************************************* 0.0 4.0 * 1.4 4.2 * 5.5 * 2.8 * 6.5 * 6.9 2.3 * 4.6 2.6 * 1.2 * 1.2 * 2.2 * 4 6 * 2 4 * 1 0 4 8 * 6 0 * 4 3 * 0 0 3 4 * 3.0 * 1.2 * 2.4 * 1.0 2.7 * 1.0 * 3.7 * 2.4 * 0.7 * 1.2 * 2.5 4.4 * 3.2 * 3.4 * 2.3 * 3.6 * 3.8 * 3.8 * 1.6 * 5.6 * 3.4 * 2.2 1.6 * * * 7060.0 * 26.8 * 7070 0 * 26.7 REF 96100 · PAGE 16 ******************************** .... . ******************************* * MEAS. * * * TRUE * COORDINATES * * DOG-LEG * * DEPTH * DEVIATION * AZIMUTH * VERTICAL ********************* COURSE * SEVERITY * * FT * DEGREES * DEGREES * DEPTH * + NORTH * + EAST * LENGTH * * * * * * FT * - SOUTH * - WEST * FT * DEG/100FT * ************************************************************************************* * 323 * 6446 0 * 1634 4 * -1406 3 * 2156 1 * 0 * 26.7 0 * 26.7 0 * 26.9 0 * 26.5 0 * 266 0 * 267 0 * 265 0 * 266 0 * 265 0 * 263 0 * 26.5 0 * 266 0 * 265 0 * 263 0 * 262 0 * 256 0 * 251 0 * 24.8 0 * 24.6 0 * 24.4 0 * 24.2 0 * 24.2 0 * 24.2 0 * 24.0 0 * 23.6 0 * 23.3 0 * 23.0 0 * 23.0 0 * 23.1 0 * 22.7 0 * 22.5 0 * 22.0 0 * 22.0 0 * 21.8 0 * 21.6 0 * 21.4 0 * 21.2 0 * 21.0 0 * 20.9 0 * 20.0 0 * 20.8 0 * 20.5 0 * 21.1 0 * 20.6 * 7080 * 7090 * 7100 * 7110 * 7120 * 7130 * 7140 * 7150 * 7160 * 7170 * 7180 * 7190 * 7200 * 7210 * 7220 * 7230 * 7240 * 7250 * 7260 * 7270 * 7280 * 7290 * 7300 * 7310 * 7320 * 7330 * 7340 * 7350 * 7360 * 7370 * 7380 * 7390 * 7400 * 7410 * 7420 * 7430 * 7440 * 7450 * 7460 * 7470 * 7480 * 7490 * 7500 * 7510 * 7520 0 * 20.7 324 * 6454 324 * 6463 325 * 6472 325 * 6481 325 * 6490 325 * 6499 324 * 6508 323 * 6517 323 * 6526 323 * 6535 322 * 6544 323 * 6553 323 * 6562 322 * 6571 322 * 6580 322 * 6589 321 * 6598 322 * 6607 322 * 6616 322 * 6625 322 * 6634 322 * 6643 9 * 1638 9 * 1641 8 * 1645 7 * 1649 7 * 1652 6 * 1656 5 * 1659 5 * 1663 4 * 1667 4 * 1670 3 * 1674 3 * 1677 2 * 1681 2 * 1684 0 * -1409 0 * 2160 6 * -1411 6 * 2165 3 * -1414 2 * 2169 0 * -1416 8 * 2174 6 * -1419 4 * 2178 3 * -1422.0 * 2183 9 * -1424.6 * 2187 6 * -1427.3 * 2191 1 * -1429.9 * 2196 7 * -1432.6 * 2200 2 * -1435.3 * 2205 8 * -1438 0 * 2209 3 * -1440 8 * -1443 6 * 1 * 6 * 1 * 5 * 0 * 4 * 9 * 4 * 8 * 3 * 7 * 1 * 1688.4 * -1446 1 * 1691.9 * -1448 1 * 1695 3 * -1451 1 * 1698 6 * -1454 2 * 1702 0 * -1456 3 * 1705 2 * -1459 4 * 1708 5 * -1462 5 * 1711 7 * -1464 322 * 6652.6 * 1714.9 * -1467 322 * 6661 8 * 1718.2 * -1469 322 * 6670 322 * 6680 321 * 6689 320 * 6698 320 * 6707 320 * 6716 319 * 6726 319 * 6735 318 * 6744 316 * 6753 315 * 6763 316 * 6772 317 * 6781 317 * 6791 317 * 6800 317 * 6809 316 * 6819 317 * 6828 317 * 6837 318 * 6847 318 * 6856 9 * 1721.4 * -1472 0 * 1724 5 * -1474 2 * 1727 4 * 1730 6 * 1733 8 * 1736 0 * 1739 3 * 1742 5 * 1745 8 * 1748 1 * 1750 4 * 1753 7 * 1756 0 * 1758 3 * 1761 6 * 1764 0 * 1766 4 * 1769 7 * 1771 1 * 1774 4 * 1776 7 * 2214 2 5 * 2218 6 2 * 2223.1 9 * 2227 5 6 * 2231 3 * 2236 9 * 2240 5 * 2244 1 * 2248 6 * 2252 1 * 2256 6 * 2261 6 * -1477 7 * -1479 7 * -1482 7 * -1484 6 * -1487 6 * -1489 3 * -1492 1 * -1494 8 * -1497 4 * -1500 1 * -1502 7 * -1505 4 * -1507 0 * -1509 5 * -1512 1 * -1514.7 * 2328 9 * 1 * 4 * 5 * 7 * 8 * 9 * 0 * 2 * 2265.0 * 7 * 2269.1 * 2 * 2273.1 * 7 * 2277.0 * 2 * 2280.9 * 7 * 2284.8 * 2 * 2288 7 * 7 * 2292 2 * 2296 8 * 2300 4 * 2303 0 * 2307 5 * 2311 0 * 2314 5 * 2318 9 * 2321 3 * 2325 2.1 2.1 4.5 1.6 2.4 1.9 1.9 4.4 2.8 7.8 2.7 4.0 1.6 0.7 2.5 2.1 3.0 8.9 5.0 2.7 2.9 1.2 3.6 3.8 2.9 3.4 5.7 2.3 3.0 3.6 7.9 3.0 5* 9.0 3 * 23.3 0 * 1.4 8* 2.6 5* 3.3 1 * 2.1 8* 0.0 4* 2.8 9* 2.6 4* 5.9 9* 2.1 6 * -1517.1 * 2332.4 * 5.0 3 * -1519.5 * 2336.0 * 1.4 9 * -1521.9 * 2339.6 * 3.5 6.6 319 * 6865 8 * 1779 5 * -1524.3 * 2343.1 * ************************************************************************************* REF 96100 PAGE 17 ************************************************************************************* * MEAS. * * * TRUE * COORDINATES * * DOG-LEG * DEPTH * DEVIATION * AZIMUTH * VERTICAL ********************* COURSE * SEVERITY * * FT * DEGREES * DEGREES * DEPTH * + NORTH * + EAST * LENGTH * * * * * * FT * - SOUTH * - WEST * FT * DEG/100FT * ************************************************************************************* * 7530.0 * 20 5 * 320 * 6875.1 * 1782.2 * -1526.5 * 2346.6 * 7540 0 * 20 320 * 6884.5 * 1784 9 * -1528.8 * 2350.1 * * 7550 * 7560 * 7570 * 7580 * 7590 * 7600 * 7610 * 7620 * 7630 * 7640 * 7650 * 7660 * 7670 * 7680 * 7690 * 7700 * 7710 * 7720 * 7730 0 * 20 0 * 20 0 * 20 0 * 20 0 * 19 0 * 19 0 * 198 0 * 19.8 0 * 19.6 0 * 19.2 0 * 19.1 0 * 19.0 0 * 19.0 0 * 19.1 0 * 19.1 0 * 19.0 0 * 19.0 0 * 19.0 0 * 18.7 * 7740 0 * 18.6 * 7750.0 * 18.6 * 7760 0 * 18.6 * 7770 * 7780 * 7790 * 7800 * 7810 * 7820 * 7830 * 7840 * 7850 * 7860 * 7870 * 7880 * 7890 * 7900 * 7910 * 7920 * 7930 * 7940 * 7950 * 7960 * 7970 * 7980 0 * 18.4 0 * 18.1 0 * 17.7 0 * 17.2 0 * 16.8 0 * 17.2 0 * 17.1 0 * 17.0 0 * 16.9 0 * 16.7 0 * 16.3 0 * 15.7 0 * 15.4 0 * 15.3 0 * 15.3 0 * 15.1 0 * 15.2 0 * 15 0 0 * 14 8 0 * 14 6 0 * 14 2 0 * 13 8 320 * 6893.9 * 1787 321 * 6903.3 * 1790 321 * 6912.7 * 1792 321 * 6922.1 * 1795 320 * 6931.5 * 1798 321 * 6940 9 * 1800 319 * 6950 3 * 1803 320 * 6959 7 * 1806 321 * 6969 1 * 1808 320 * 6978 319 * 6988 6 * -1531.0 * 2353.5 * 2 * -1533.2 * 2357.0 * 9 * -1535 3 * 2360.4 * 6 * -1537 2 * -1539 8 * -1541 4 * -1544 0 * -1546 6 * -1548 5 * 1811.2 * -1550.5 * 2384 0 * 1813 6 * -1552.6 * 2387 5 * 2363.9 7 * 2367 3 8 * 2370 7 0 * 2374 1 2 * 2377 5 4 * 2380 9 2 4 318 * 6997 319 * 7006 321 * 7016 321 * 7025 321 * 7035 321 * 7044 321 * 7054 319 * 7063 318 * 7073 319 * 7082 319 * 7092 4 * 1816 9 * 1818 3 * 1821 8 * 1823 2 * 1826 7 * 1828 2 * 1831 6 * 1833 1 * 1836 6 * 1838 1 * 1840 321 * 7101.5 * 1843 321 * 7111.0 * 1845 321 * 7120.5 * 1848 321 * 7130.1 * 1850 321 * 7139.6 * 1852 320 * 7149 2 * 1854 321 * 7158 321 * 7168 321 * 7177 321 * 7187 321 * 7197 319 * 7206 317 * 7216 318 * 7225 319 * 7235 320 * 7245 320 * 7254 321 * 7264 320 * 7274 321 * 7283 320 * 7293 320 * 7303 8 * 1857 3 * 1859 9 * 1861 5 * 1863 1 * 1866 7 * 1868 3 * 1870 9 * 1872 6 * 1874 2 * 1876 9 * 1878 6 * 1880 2 * 1882 9 * 1884 6 * 1886 3 * 1887 1 * -1554.8 * 2390 5 * -1556.9 * 2393 0 * -1559 0 * 2397 6 * -1561 1 * -1563 6 * -1565 1 * -1567 6 * -1569 0 * -1571 4 * -1573 8 * -1575 2 * -1577 6 * -1579 0 * -1581 3 * -1583 6 * -1585 1 * 2400 1 * 2403 2 * 2407 3 * 2410 3 * 2413 4 * 2416 6 * 2419 6 * 2423 7 * 2426 7 * 2429 6 * 2432 5 * 2435 4 * 2438 7 * 9 * 2 * 5 * 7 * 0 2 5 * 7 * 8 * 0 * 2 * 3 * 4 * 4 * 3 * 9 * -1587 2 * -1589 4 * -1590 7 * -1592 9 * -1594 1 * -1596 2 * -1598 2 * -1600 1 * -1601 1 * -1603 1 * -1605 1 * -1606 1 * -1608 1 * -1610 0 * -1611 0 * -1613 2 * 2441.3 1 * 2444.2 9 * 2447.2 8 * 2450.1 6 * 2452.9 4 * 2455 8 2 * 2458 5 0 * 2461 2 8 * 2463 8 5 * 2466 5 2 * 2469 1 9 * 2471 7 6 * 2474 3 2 * 2476.9 8 * 2479.4 4 * 2481.9 8 * -1615.0 * 2484.4 * * 7990 0 * 13 6 * 320 * 7313 0 * 1889 6 * -1616.5 * 2486.7 * 2.6 ************************************************************************************* 6.9 * 2.1 * 1.2 * 1.0 * 4.2 * 5.3 * 5.6 3.9 * 7.8 * 7.9 * 5.6 * 7.6 * 2.5 * 5.1 * 4.4 * 4.6 * 1.7 * 1.7 1.4 4.2 * 3.6 2.0 * 3.4 * 3.0 3.1 * 4.6 3.4 1.2 3.6 * 3.4 * 2.2 * 1.2 * 3.0 * 1.7 * 5.5 * 9.3 * 2.5 * 2.4 4.2 1.2 * 2.8 * 1.6 * 1.0 3.6 * 4.7 * 4.5 * * 8000.0 * 13.0 * 8010.0 * 12.9 * 8020.0 * 12.6 * 8030.0 * 11.3 * 8040.0 * 12.3 * 8050.0 * 12.0 * 8060.0 * 11.9 * 8070.0 * 11.3 * 8080.0 * 11.2 * 8090 0 * 11.5 REF 96100 PAGE 18 ************************************************************************************* * MEAS. * * * TRUE * COORDINATES * * DOG-LEG * * DEPTH * DEVIATION * AZIMUTH * VERTICAL ********************* COURSE * SEVERITY * * FT * DEGREES * DEGREES * DEPTH * + NORTH * + EAST * LENGTH * * * * * * FT * - SOUTH * - WEST * FT * DEG/100FT * ************************~***************************************************~******* * 318 * 7322.7 * 1891.4 * -1618.0 * 2489 0 * 7.9 317 * 7332.5 * 1893.0 * -1619.5 * 2491 3 * 2.7 316 * 7342.2 * 1894.6 * -1621.0 * 2493 4 * 16.8 317 * 7352.0 * 1896.1 * -1622.4 * 2495 4 * 28.2 317 * 7361.8 * 1897 6 * -1623.9 * 2497 6 * 2.3 0 * 11.4 0 * 11.2 0 * 10.5 0 * 10.8 0 * 10.9 0 * 10.7 0 * 10.8 0 * 11.3 0 * 11.1 0 * 11.2 0 * 11.3 0 * 11.0 0 * 10.9 0 * 10.5 0 * 10.3 0 * 9.9 0 * 9.7 0 * 9.8 0 * 9.7 0 * 9.7 0 * 95 0 * 93 0 * 90 0 * 87 0 * 85 0 * 85 0 * 84 0 * 83 0 * 82 0 * 80 0 * 78 0 * 76 0w 77 0 * 76 0 * 75 0 * 73 * 8100 * 8110 * 8120 * 8130 * 8140 * 8150 * 8160 * 8170 * 8180 * 8190 * 8200 * 8210 * 8220 * 8230 * 8240 * 8250 * 8260 * 8270 * 8280 * 8290 * 8300 * 8310 * 8320 * 8330 * 8340 * 8350 * 8360 * 8370 * 8380 * 8390 * 8400 * 8410 * 8420 * 8430 * 8440 * 8450 317 * 7371.6 * 1899 319 * 7381.4 * 1900 320 * 7391.1 * 1902 322 * 7401.0 * 1903 323 * 7410.8 * 1905 322 * 7420.6 * 1906 321 * 7430.4 * 1908 318 * 7440.2 * 1909 320 * 7450.0 * 1911 321 * 7459.8 * 1912 321 * 7469 7 * 1914 325 * 7479 5 * 1915 324 * 7489 3 * 1917 324 * 7499 1 * 1918 324 * 7508 9 * 1920 324 * 7518 7 * 1921 324 * 7528.5 * 1923 324 * 7538 4 * 1925 324 * 7548 323 * 7558 322 * 7567 321 * 7577 322 * 7587 324 * 7597 325 * 7607 325 * 7617 325 * 7627 324 * 7636 2 * 1926 0 * 1928 9 * 1929 7 * 1930 6 * 193~ 4 * 1933 3 * 1934 1 * 1936 0 * 1937 9 * 1938 1 * -1625.3 * 2499 7 * 3.9 7 * -1626.7 * 2501 7 * 5.9 2 * -1628.0 * 2503 7 * 2.2 7 * -1629.2 * 2505 7 * 3.2 3 * -1630.4 * 2507 6 * 2.1 9 * -1631.6 * 2509.6 * 5.0 4 * -1632.8 * 2511.6 * 3.0 8 * -1634.0 * 2513 4 * 5.4 2 * -1635.2 * 2515 3 * 2.6 7 * -1636.4 * 2517 2 * 1.0 1 * -1637 6 * 2519 0 * 7.2 6 * -1638 7 * 2520 2 * -1639 8 * 2522 8 * -1641 0 * 2524 3 * -1642 1 * 2526 9 * -1643 3 * 2528 5 * -1644.4 * 2530 0 * -1645.5 * 2532 5 * -1646.6 * 2534 0 * -1647.7 * 2536 4 * -1648.7 * 2537 7 * -1649.8 * 2539 9 * 14.2 8* 2.1 8* 2.1 7* ]-.2 6* 2.0 6* 2.1 5* 1.2 3* 3.6 1 * 4.0 9* 3.1 6* 1.4 8.9 2.0 1.7 2.3 3.6 3.0 1.7 2.3 0.0 0.0 1.9 1.7 2.3 3.7 1.2 1.7 1.2 2.8 2.8 0 * -1650.8 * 2541.2 4 * -1651.8 * 2542 9 8 * -1652.8 * 2544 6 1 * -1653.8 * 2546 3 5 * -1654.7 * 2547 9 8 * -1655 6 * 2549 5 324 * 7646 323 * 7656 323 * 7666 323 * 7676 323 * 7686 323 * 7696 323 * 7706 323 * 7716 325 * 7725 324 * 7735 324 * 7745.8 * 1951 323 * 7755.7 * 1952 8 * 1940 0 * -1656 7 * 1941 5 * 1942 4 * 1943 3 * 1944 2 * 1945 1 * 1947 0 * 1948 9 * 1949 9 * 1950 2 * - 1657 4 * -1658 5 * -1659 7 * -1660 9 * -1661 0 * -1661 1 * - 1662 2 * -1663 5 * 2551 4 * 2552 3 * 2554 2 * 2555 1 * 2556 0 * 2558 8 * 2559 6 * 2561 4 * 2562 3 * -1664.2 * 2563 3 * -1665.0 * 2565 4 * -1665.8 * 2566 5 0 * 5 * 9 * 3 * 8 * 1 5 * 8 * 1 * 4 * 322 * 7765.6 * 1953 4 * -1666.6 * 2567 7 * · 8460 0 * 7 3 * 322 * 7775.5 * 1954 4 * -1667.3 * 2569 0 * 1.7 * ************************************************************************************* ,, REF 96100 PAGE 19 ************************************************************************************* * MEAS. * * * TRUE * COORDINATES * * DOG-LEG * * DEPTH * DEVIATION * AZIMUTH * VERTICAL ********************* COURSE * SEVERITY * * FT * DEGREES * DEGREES * DEPTH * + NORTH * + EAST * LENGTH * * * * * * FT * - SOUTH * - WEST * FT * DEG/100FT * ************************************************************************************* * 8470.0 * 8480.0 * 8490.0 * 8500.0 * 8510 0 * 8520 0 * 8530 0 * 8540 0 * 8550 0 * 8560 0 * 8570 0 * 8580 0 * 8590 0 * 8600 0 * 8610 0 * 8620 0 * 8630 0 * 8640 0 * 8650 0 * 8660 0 * 8670 0 * 8680 0 * 8690 0 * 8700 0 * 8710 0 * 8720.0 * 8730 0 * 8740 0 * 8750 0 * 8760 0 * 8770 0 * 8780 0 * 8790 0 * 8800 0 * 8810 0 * 8820 0 * 8830 0 * 8840 0 * 8850 0 * 8860 0 * 8870 0 * 8880 0 * 8890 0 * 8900 0 * 8910 0 * 8920 0 * 8930 *******~ 7.3 7.2 7.0 6.9 6.7 6.4 6.0 5.4 4.9 4.7 4.1 3.6 3.2 2.8 2 5 2 6 2 4 2 5 2 5 2 6 2 6 2 7 2 6 2 7 2 6 2.6 2.7 2.8 2.8 2.8 2.4 2.1 1.9 2.0 2.0 2 0 2 0 1 9 2 2 2 3 2 3 2 3 2 4 2 3 2 3 2.3 322 * 7785.4 * 1955.4 * -1668 1 * 2570.3 * 323 * 7795.4 * 1956.4 * -1668 324 * 7805.3 * 1957.4 * -1669 322 * 7815.2 * 1958.4 * -1670 323 * 7825 1 * 1959.3 * -1671 322 * 7835 1 * 1960.2 * -1671 321 * 7845 0 * 1961.1 * -1672 318 * 7855 0 * 1961.8 * -1673 318 * 7864 9 * 1962 5 * -1673 319 * 7874 9 * 1963 1 * -1674 321 * 7884 9 * 1963 7 * -1674 324 * 7894 8 * 1964 2 * -1675 328 * 7904.8 * 1964 7 * -1675 337 * 7914 8 * 1965 2 * -1675 347 * 7924 8 * 1965 6 * -1675 8 * 1966 1 * -1675 8 * 1966 5 * -1675 8 * 1966 9 * -1675 8 * 1967 4 * -1675 7 * 1967 8 * -1675 7 * 1968 3 * -1675 7 * 1968 7 * -1675 7 * 1969 1 * -1675 7 * 1969 6 * -1675 17 * 8024.7 * 1970 0 * -1675 17 * 8034.7 * 1970 4 * -1675.0 * 2586 17 * 8044.7 * 1970 9 * -1674.8 * 2586 16 * 8054 7 * 1971 3 * -1674.7 * 2586 16 * 8064 6 * 1971 8 * -1674.6 * 2586 18 * 8074 6 * 1972.3 * -1674.4 * 2587 15 * 8084 6 * 1972 7 * -1674.3 * 2587 359 * 7934 4 * 7944 6 * 7954 10 * 7964 15 * 7974 16 * 7984 17 * 7994 15 * 8004 16 * 8014 13 * 8094 9 * 8104 6 * 8114 8 * 8124 6 * 8134 4 * 8144 3 * 8154 5 * 8164 4 * 8174 5 * 8184 9 * 8194 9 * 8204 8 * 8214 5 * 8224 2 * 8234 6 * 1973 6 * 1973 6 * 1973 6 * 1974 6 * 1974 6 * 1974 6 * 1975 6 * 1975 6 * 1975 6 ,* 1976 6 * 1976 5 * 1977 5 * 1977 5 * 1977 5 * 1978 9 * 2571.5 6 * 2572.8 4 * 2574.0 1 * 2575.1 8 * 2576.3 4 * 2577.4 1 * 2578.4 7 * 2579.3 3 * 2580.1 8 * 2580.9 2 * 2581.5 5 * 2582.1 7 * 2582.7 9 * 2583.1 9 * 2583.5 9 * 2583.8 9 * 2584.1 8 * 2584.4 7 * 2584.6 6 * 2584.9 5 * 2585 2 4 * 2585 4 2 * 2585 7 1 * 2585 9 1 * -1674.2 * 2587 4 * -1674.1 * 2587 8 * -1674.1 * 2588 1 * -1674 0 * 2588 0 * 2588 0 * 2588 0 * 2589 9 * 2589 9 * 2589 9 * 2589 8 * 2590 8 * 2590 7 * 2590 6 * 2591 6 * 2591 2 * 4 * 7 * 9 * 2 4 * 7 * 9 1 * 4 * 6 8 * 1 * 3 * 6 * 9 * 2 * 4 * 7 * 0 * 3 *. 5 * -1674 8 * -1674 2 * -1674 5 * -1673 9 * -1673 3 * -1673 7 * -1673 1 * -1673 5 * -1673 9 * -1673 3 * -1673 1.2 * 2.5 * 0.0 * 2.8 * 2.0 * 4.5 * 6.5 * 5.6 * 3.2 * 4.0 * 6.3 * 4.7 * 6.1 * 5.3 6.9 * 4.6 * 1.0 3.0 1.6 2.8 * 0.0 * 0.0 0.0 1.4 * 0.0 0.7 * 1.7 * 2.2 * 1.7 * 1.4 * 6.2 * 1.6 * 2.3 * 0.7 * 1.0 1.7 * 1.0 * 2.8 2.9 * 0.0 * 0.0 * 2.3 * 1.6 * 1.6 * 1.7 * 0.0 * 0 * 2.3 * 2 * 8244 5 * 1978 7 * -1673 6 * 2591 6 * 0.0 * ***************************************************************************** * 8940 . 0 * * 8950 0 * * 8960 0 * 8970 0 * * 8980 0 * 8990 0 * * 9000 0 * * 9010 0 * * 9020 0 * * 9030 0 * * 9040 . 0 * 9050 0 * * 9060 0 * * 9070 0 * * 9080 0 * * 9090 0 * * 9100 0 * * 9110 0 * 9120 0 * 9130 0 * * 9140 0 * * 9150 0 * * 9160 0 * * 9170 0 * * 9180 0 * * 9190.0 * * 9200 0 * * 9210 0 * * 9220 0 * * 9230 0 * * 9240 0 * * 9250 0 * * 9260 0 * * 9270 0 * * 9280 0 * * 9290 0 * * 9300 0 * * 9310 0 * * 9320.0 * * 9330 . 0 * * 9340. 0 * * 9350 . 0 * * 9360.0 * * 9370 . 0 * * 9380.0 * * 9390 . 0 ************************************************************************************* * MEAS. * * * TRUE * COORDINATES * * DOG-LEG * * DEPTH * DEVIATION * AZIMUTH * VERTICAL ********************* COURSE * SEVERITY * * FT * DEGREES * DEGREES * DEPTH * + NORTH * + EAST * LENGTH * * * * * * FT * - SOUTH * - WEST * FT * DEG/100FT * ********~*****~************************~*******************~*****************~***~ * 2 * 8254.5 * 1979 1 * -1673 6 * 2591 9 * * * 1 * 8274 * 2 * 8284 * 360 * 8294 * 359 * 8304 * 360 * 8314 * 3 * 8324 * 4 * 8334 * 359 * 8344 * 359 * 8354 * 358 * 8364 * 356 * 8374 * 357 * 8384 * 358 * 8394 * 359 * 8404 * 356 * 8414 * 355 * 8424 * 355 * 8434 * 353 * 8444 * 357 * 8454 * 1 * 8464 * 358 * 8474 * 352 * 8484 * 355 * 8494 * 355 * 8504 * 354 * 8514 * 352 * 8524 * 355 * 8534 * 359 * 8544 * 356 * 8554 * 356 * 8564 * 356 * 8574 * 355 * 8584 * 355 * 8594 * 352 * 8604 * 351 * 8614 * 349 * 8624 * 350 * 8634 * 356 * 8644 * 355 * 8654 * 351 * 8664 * 352 * 8674 * * * 2.3 2.3 2.3 2.3 2.5 2.6 2.6 2.6 2.7 2.8 2.8 2.9 2.9 2.8 2.7 2.7 2.7 2.9 2.8 2.9 2.6 2.7 2.7 2.6 2.8 3.0 2.9 2.9 3.2 3.1 2 9 3 0 3 0 3 1 3 1 3 2 3 2 2 9 2 9 2.9 3.1 2.7 2.7 2.8 3.0 3.2 3 * 8264 5 * 1979 5 * 1979 5 * 1980 5 * 1980 4 * 1981 4 * 1981 4 * 1982 4 * 1982 4 * 1983 4 * 1983 4 * 1984 4 * 1984 4 * 1985 3 * 1985 3 * 1985 3 * 1986 3 * 1986 3 * 1987 3 * 1987 3 * 1988 3 * 1988 3 * 1989 3 * 1989 2 * 1990 2 * 1990 2 * 1991 2 * 1991 2 * 1992 2 * 1992 2 * 1993 1 * 1993 1 * 1994 1 * 1994 1 * 1995 ! * 1996 1 * 1996 1 * 1997 0 * 1997 0 * 1998 0 * 1998 0 * 1999 0 * 1999 352 * 8684.0 * 2000 352 * 8694.0 * 2000 352 * 8703.9 * 2001 5 * -1673 6 * 2592 9 * -1673 6 * 2592 3 * -1673 6 * 2592 7 * -1673 5 * 2593 2 * -1673 6 * 2593 6 * -1673.6 * 2593 1 * -1673.6 * 2594 5 * -1673.5 * 2594 0 * -1673.5 * 2594 5 * -1673.5 * 2595 0 * -1673.5 * 2595 5 * -1673.6 * 2595 0 * -1673.6 * 2596 4 * -1673.6 * 2596 9 * -1673.6 * 2597 4 * -1673.6 * 2597 9 * -1673.7 * 2597 4 * -1673.7 * 2598 9 * -1673.8 * 2598 3 * -1673.8 * 2599 8 * -1673.8 * 2599 3 * -1673.8 * 2599 7 * -1673.9 * 2600 2 * 5 * 8 * 1 4 * 8 * 1 * 4 * 8 * 2 * 5 * 9 * 3 * 7 * 1 * 5 * 9 3 7 * 1 4 * 8 * 2 * 2 * -1673.9 * 2600.6 7 * -1674.0 * 2601.0 2 * -1674 0 * 2601.4 7 * -1674 2 * -1674 8 * -1674 3 * -1674 8 * -1674 3 * -1674 9 * -1674 1 * 2601.8 * 2 * 2602 3 * 2 * 2602 7 * 2 * 2603 1 * 2 * 2603 5 * 3 * 2604 0 * 3 * 2604 4 * 4 * 11674.4 * 2604 0 * -1674.4 * 2605 5 * -1674.5 * 2605 0 * -1674 6 * 2606 5 * -1674 0 * -1674 5 * -1674 0 * -1674 5 * -1674 0 * -1675 5 * -1675 0 * -1675 8 * 3 * 8 * 2 * 7 * 2606 7 * 8 * 2607 1 8 * 2607 5 * 8 * 2607 9 * 9 * 2608 3 * 0 * 2608 7 1 * 2609 2 1 * 2609 6 * 9400.0 * 2.9 * 352 * 8713.9 * 2001 6 * -1675 2 * 2610 1 * 8.6 * ************************************************************************************* 0.0 1.0 * 0.0 2.1 * 1.0 * 1.2 * 1.0 1.6 * 2.0 * 3.1 * 2.2 * 2.0 * 1.6 * 1.0 * 1.4 * 0.7 * 1.0 * 1.2 * 2.7 * 4.0 * 3.5 * 2.2 * 1.9 3.1 * 4.3 * 1.0 * 2.1 * 1.7 * 3.0 3.1 * 0.7 * 0.0 * 1.0 0.0 1.2 * 0.7 * 3.9 * 1.0 2.0 * 3.9 * 4.8 * 2.3 * 0.0 0.0 2.3 * 1.0 * REF 96100 PAGE 21 ************************************************************************************* * MEAS. * * * TRUE * COORDINATES * * DOG-LEG * * DEPTH * DEVIATION * AZIMUTH * VERTICAL ********************* COURSE * SEVERITY * * FT * DEGREES * DEGREES * DEPTH * + NORTH * + EAST * LENGTH * * * * * * FT * - SOUTH * - WEST * FT * DEG/100FT * **** ~* ~***** ~********* ~********* ~******* ~*~* ~*~***********~. ~*************** ~****** * 352 * 8723 9 * 2002.0 * -1675.3 * 2610.5 * 353 * 8733 9 * 2002 6 * -1675.3 * 2610.9 * 3 0 3 0 3 2 3 2 3 2 3 0 3 1 3 2 3 0 3 3 3 2 3 0 3 1 3 2 3 2 2 8 2 9 2 9 3 0 3 3 3 0 3 0 3 0 3 1 3 2 3.1 2.9 3.0 2.9 2.8 2.4 2.3 2.3 2.3 * 9410 * 9420 * 9430 * 9440 * 9450 * 9460 * 9470 * 9480 * 9490 * 9500 * 9510 * 9520 * 9530 * 9540 * 9550 * 9560 * 9570 * 9580 * 9590 * 9600 * 9610 * 9620 * 9630 * 9640 * 9650 * 9660 * 9670 * 9680 * 9690 * 9700 * 9710 * 9720 * 9730 * 9738 355 * 8743 354 * 8753 354 * 8763 353 * 8773 351 * 8783 350 * 8793 348 * 8803 354 * 8813 355 * 8823 9 * 2003 9 * 2003 9 * 2004 8 * 2004 8 * 2005 8 * 2005 8 * 2006 8 * 2006 8 * 2007 354 * 8833.8 * 2008 358 * 8843 7 * 2008 356 * 8853 352 * 8863 354 * 8873 356 * 8883 357 * 8893 359 * 8903 358 * 8913 352 * 8923 353 * 8933 355 * 8943 355 * 8953 355 * 8963 353 * 8973 354 * 8983 7 * 2009 7 * 2009 7 * 2010 7 * 2010 7 * 2011 7 * 2011 6 * 2012 6 * 2012 6 * 2013 6 * 2013 6 * 2014 6 * 2014 6 * 2015 5 * 2015 356 * 8993.5 * 2016 352 * 9003.5 * 2016 350 * 9013.5 * 2017 346 * 9023.5 * 2017 346 * 9033.5 * 2018 346 * 9043.5 * 2018 346 * 9051.5 * 2019 1 * -1675.4 * 2611.4 * 6 * -1675.5 * 2611 8 * 2 * -1675.5 * 2612 7 * -1675.6 * 2612 3 * -1675.6 * 2613 8 * -1675.7 * 2613 3 * -1675.8 * 2614 9 * -1675.9 * 2614 4 * -1676.0 * 2615 0 * -1676.0 * 2615 5 * -1676.1 * 2615 0 * -1676.1 * 2616 6 * -1676 1 * 2616 1 * -1676 6 * -1676 1 * -1676 6 * -1676 2 * -1676 7 * -1676 2 * -1676 8 * -1676 3 * -1676 8 * -1676 2 * 2617 3 * 2617 3 * 2618 3 * 2618 3 * 2618 4 * 2619 4 * 2619 5 * 2620 5 * 2620 6 * 2621 3 7 * 2 * 7 * 1 6 * 1 * 5 * 9 * 4 * 9 * 3 * 7 * 1 * 5 * 9 * 4 * 8 * 3 * 7 * 2 * 4 * -1676.6 * 2621.6 * 9 * -1676 7 * 2622.1 * 7 * 2622.5 8 * 2622.9 9 * 2623.3 0 * 2623.7 1 * 2624.1 2 * 2624.5 2 * 2624.7 4 * -1676 9 * -1676 4 * -1676 8 * -1677 2 * -1677 6 * -1677 0 * -1677 6.9 * 2.6 * 0.0 * 0.7 * 1.2 * 1.0 * 1.7 * 1.0 * 0.7 * 0.7 * 0.7 * 5.2 * 6.0 * 1.2 * 2.1 * 6.1 * 2.2 * 0.0 * 4.3 * 6.2 * 2.2 * 0.7 * 0.0 * 0.0 * 1.7 * 1.7 * 2.8 * 1.0 * 3.6 * 1.2 * 3.5 * 0.0 * 0.0 * 0.0 * REF 96100 - PAGE 22 ************************************************************************************* * BOTTOM HOLE LOCATION . * * COURSE LENGTH 2624.7 FT . * * COURSE AZIMUTH 320.3 DEGREES * * * MEASr.~ED DEPTH 9738.0 FT . * TRUE VERTICAL DEPTH 9051.5 FT . * * DIST32xlCE NORTH 2019.0 FT . * DISTANCE WEST 1677.2 FT . * * EXACT Rg~DIUS OF CURVATIIRE METHOD . AI~' on Domes~,, Hroduction Marathon Oil Company P.O. Box 196168 Anchorage, AK 99519-6168 Telephone 907/561-5311 August 2, 1996 ARCO Alaska, Inc. Attn: Mr. Pat Foley P. O. Box 100360 Anchorage, AK 99510-0360 Bureau of Land Management Attn: Joe Dygas 6881 Abbott Loop Rd. Anchorage, AK 99507-2591 Anchorage Mr. Cliff Burglin P. O. Box 131 Fairbanks, AK 99707-0131 / 'v' Alaska Oil & Gas Conservation Commission Attn: Mr. Howard O~tkland 3001 Porcupine Drive Anchorage, AK 99501-3192 RE: Marathon Corea Creek Federal No. I Well Data d/~-_ /.~ .~ Section 12, TIN, R13W Kenai Peninsula Borough, AK Gentlemen: The data listed below are supplied to you for the above mentioned well. We will forward any additional data as it becomes available. Please sign below and return this letter confirming your receipt of the data. Please consider this information confidential and for use only within your organization. Completion Record Log, 06/01/96 ................ Blue/ine & Sepia Logs Completion Record Log, 06/02/96 ................ Blue/ine & Sepia Logs Completion Record Log, 07/10/96 ................ Blueline & Sepia Logs Gamma Ray/Collar Locater, 06/02/96 ............. Blue/ine & Sepia Logs Regards, Exploitation Manager kz:EXPL~ccrk0802.1tr Enclosures Receive d By: t. '~v'"~~..b~(~;--~ Date: A subsidiary of USX Corporation Environmentally aware for the long run. · Type of Request: Abandon i STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS · Name of Operator ~ Suspend ~ Operation Shutdown X Re-enter Suspended Well Alter Casing ~ Repair Well~ Plugging.~X --'--Time Extension Stimulate Change Approved Program __ Pull Tubing ~ Variance ~ Perforate Other MARATHON OIL COMPANY · Address P. O. Box 196168, Anchorage, AK 99519-6168 ~ Location of Well at Surface 1567' FSL, 1573' FEL, Sec. 12, T1N, R13W, S.M. At top of Productive Interval 2526' FNL, 2614' FEL, Sec. 12, T1N, R13W, S.M. @ 5394' tvd At Effective Depth 1833' FNL, 2469' FWL, Sec. 12, T1N, R13W, S.M. @ 5925' tvd At Total Depth 1694' FNL, 2030' FWL, Sec. 12, T1N, R13W, S.M. @ 9052' tvd Present Well Condition Summary 5. Type of Well: Development Exploratory X Stratigraphic Service 6. Datum Elevation (DF or KB) 32.2' RKB feet 7. Unit or Property Name Corea Creek Federal 8. Well Number Corea Creek Federal #1 9. Permit Number 95-0123 lO. APl Number 50- 133-20467 11. Field/Pool Wildcat/Tyonek Total Depth: measured 9738 feet true vertical 9052 feet Plugs (measured) 9571', 8644', 6470' Effective Depth: measured 6470 feet true vertical 5925 feet Junk (measured) None Casing Length Size Cemented Measured Depth Structural 111' 20" Driven 111' Conductor Surface 2508' 13-3/8" 190 SX 2508' Intermediate 8370' 9-5/8" 870 SX 8370' Production 9688' 7" 1200 SX 9688' Liner Perforation Depth: True Vertical Depth 111' 2463' 7686' 9001' measured Open: 5860-5890', P/A'd: 6620-6650', 7095-7115', 9086-9101', 9105-9175', 9320-9350' true vertical Open: 5394-5420', P/A'd: 6057-6083', 6478-6496', 8400-8415', 8419-8489', 8634-8664' Tubing (size, grade, and measured depth) 3-1/2.', 9.3~, L-80, 5484' Packers and SSSV (type and measured depth) Baker SAB 84-40x32 Packer, 5317' ~,ttachments Description Summary of Proposal X Detailed Operations Program BOP Sketch =,, :_stimated Date for Commencing Operation 15. Status of Well Classification as: 816196 ~Proposal was Verbally Approved Oil Gas X ~ame of Approver Date Approved Service hereby certify that the foregoing is true and correct to the best of my knowledge. Suspended Title Production Engineer FOR COMMISSION USE ONLY Date litions of Approval: Notify Commission so representative may witness Plug Integrity_._.~,.-" BOP Test ~ Location Clearance Mechanical Integrity Test Subsequent Form Required 10- "" ~O ~ )ved by Order of the Commission 0-403 Rev. 06/15/88 Original Signed By ~on Commissioner Date .~ ~-5- ~ Submit in Triplicate Marathon Oil Company Wireline Work Request Well CC-1 Field/Platform: Lease: Site: Corea Creek A-024399 N. Pad Packer: Tbg: EOT: Sand: T-l, Test Interval //8 T-2, Test Interval //5 P/A'd T-3, Test Interval //1, 2, 4 P/A'd Min ID: KB: 32.2' 5316.8' 3-1/2",9.3//,L-80 5483.4' 2.813" (5369.8', 5445.7 Tubing Clear: Yes Est Start Date: 8~6~96 Fill depth: 6132' Est Comp Date: 8/7/96 Tree Connection: 3-1/2" 8rd OBJECTIVE: 8/1/96 Place cement plug across T-l, test plug, and install BVP in tubing hanger. POTENTIAL PROBLEMS: JSticking CT. LAST WELL WORK: 7/12~96 - Blowdown well w/CT. PROCEDURE: 1. Conduct safety and environmental meeting. Review procedure. 2. RU 1-3/4" CTU. PT CT to 4000 psig. 3. RIH and tag bottom (note: fill was last tagged at 6132'). PU above bottom. 4. Mix up cement slurry per Dowell design to bring cement plug up to 5650'. (Volume of cement required for a 482' plug is 18.4 bbls slurry.) 5. RIH to bottom. Pump slurry down CT. Begin POOH on a 1:1 displacement after 1 bbl of cement has passed through CT nozzle. PU above cement plug and pump two CT volumes (48 bbls) while POOH. NOTE: maintain 200 psig back pressure through out job. 6. CCH. Leave 200 psig on well. RD injector head, and secure BOPs w/night cap. 7. Allow cement to set up overnight. 8. RU CT and PT to 4000 psig. 9. Pressure up on cement plug to 1000 psig. Hold for 30 minutes after pressure stabilizes, and montior for leakoff. 10. RIH and tag top of cement. Cement top should be at 5650' but should be a minumum of 5810'. 11. POOH and RD CT. Clean up area and send CT to KGF Pad 14-6. 12. Haul exempt fluids to Pad 41-18. 13. Insure no pressure on tubing or casing strings. 14. RU GLM and install BPV in tubing hanger. 15. Lock all tree valves closed. QUESTIONS/COMMENTS? APPROVALS: Contact Mike Olson, 564-6315 (Terry J. Kovacevich) Fax to KGF Foreman H:excel\wireline\cc\cc- 1 \01 8.xls Corea Creek #1 Hanger: 32.2-32.8 (OD:6.050 ID:2.992) -Y SURFACE CASING: 327.0 [0D:13.375 Wt:61.00) iNTERMEDIATE CASING: 2563.0 (OD:9.625 ;~t:43.00) ~ Tubing: 32.8-890.4 i0D:3.500 ID:2.992) J PRODUCTION CASING: 7770.0 (OD:7.000 Wt:26.00) Tubing: 897.3-5315.7 (0D:3.500 ID:2.992) ~' ~0-40 K Anchor: 5315.7-5316.~ (OD:4.750 [D:3.250) Tubing: 5321.7-5369.8 Camco X Nipple: 5369.8-5377.4 Tubing: 5377.4-5445.7 Camco X Nipple: 5445.7-5447.1 Tubing: 5447.1-54~2.7 OD:3.500 ID:2.992) OD:3.950 ID:2.813) J OD:3.500 ID:2.992) --~ / OD:3.950 ID:2.$13) ~' OD:3.S00 ID:2.992) I'Co~e 5825.0 - 5885.0 Pete 5860.0 - 5890.0 Perf 6620.0 - 6650.0 / Cement Plug: 6470.0-6907.0 (OD:6.279) --/ Cement Plug: 6894.0-7170.0 (0D:6.279) Perf 7095.0 - 7115.0 Bridge Plug: 7170.0'-7175.0 (OD:6.279) PRODUCTION CASING: 7770.0-9688.0 (©D:7.000 Wt:29.00) Cement Plug: 8644.0-8844.0 (OD:6.184) Perf 9086.0 - 9101.0 / Sand Plug: 8833.0-9524.0 (OD:6.184) -/ Peri 9105.0 - 9175.0 Perf 9220.0 - 9350.0 Cement Retainer: 9571.0-9575.0 (0D:6.184) Marathon APl # 50-133-20467 812/96 AlaskaI" Domestic Production Marathon Oil Company P.O. Box 196168 Anchorage, AK 99519-6168 Telephone 907/561-5311 July 3, 1996 ARCO Alaska, Inc. Attn: Mr. Pat Foley P. O. Box 100360 Anchorage, AK 99510-0360 Bureau of Land Management Attn: Joe Dygas 6881 Abbott Loop Rd. Anchorage, AK 99507-2591 Alaska Oil & Gas Conservation Commission Attn: . ~ Mr Howard O kland 3001 Porcupine Drive Anchorage, AK 99501-3192 Chevron USA, Inc. Attn: Mr. Paul Walker P. O. Box 1635 Houston, TX 77251-1635 Mr. Cliff Burglin P. O. Box 131 Fairbanks, AK 99707-0131 RE: Marathon Corea Creek Federal No. I Well Data Section 12, T1N, R13W Kenai Peninsula Borough, AK Gentlemen: The data listed below are supplied to you for the above mentioned well. We will forward any additional data as it becomes available. Please sign below and return this letter confirming your receipt of the data. Please consider this information confidential and for use only within your organization. Dual Spacing Thermal Decay Time Log, 6/20/96 ..... Blueline & Sepia Logs Completion Record Posiset Plug, 6/20/96 .......... Blueline & Sepia Logs Completion Record, 6/24/96 ..................... Blueline & Sepia Logs Daily Well Operations Reports from 5/25/96 to 6/25/96 Regards, Exploitation Manager DLB/kz:EXPL\ccrk0703. Itr Enclosures A subsidiary of USX Corporation Received By: ,~b~,~ ~).~ RECEIVED Date: JUL 0 8 1996 Environmentally a~la~~ ~;1~. Commission Anchorage Marathon Oil Company Alaska ( .~n Domestic Production P.O. Box 196168 Anchorage, AK 99519-6168 Telephone 907/561-5311 July 3, 1996 Blair Wondzell Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501-3192 Dear Blair: Attached is AOGCC Form 403 to abandon Test Interval #5 in Corea Creek Federal #1. To date Marathon has tested Test Intervals 1, 2, 4 and 5. Initial gas rates of 7 - 30 mscfpd have been produced from each zone. Although water has not been produced to surface, the zones have tested wet. Downhole gauges have indicated a fluid level building between 0.5 to 2.5 bph. Test Interval #1 (9320- 9~50')and #2 (9086-9175,) were sanded back on 6/12/96. A cement ~ug was placed on top of the sand plug above Tis #1 and #2 on 18/96. A bridge plug was placed below TI #4 followed by a cement plug across TI #4. Currently only TI #5 is open. Current plans are to P/A TI #5 and perforate/test TI #8 Attached is an updated well bore diagram. ' Should you have any questions please give me a call at 907-564- 6315. ' Sincerely, Production Engineer Attachments cc: CEF RECEIVED JUL 0 8 1996 Alaska 011 & {3as Cons. Comaission Anchorage A subsidiary of USX Corporation Environmentally aware for the long run. STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS 'ype of Request: Abandon Suspend Operation Shutdown Alter Casing __ Repair Well Plugging ~ Change Approved Program Pull Tubing Variance Re-enter Suspended Well Time Extension Stimulate Perforate X Other Jame of Operator MARATHON OIL COMPANY ~ddress P. O. Box 196168, Anchorage, AK 99519-6168 .ocation of Well at Surface 1567' FSL, 1573' FEL, Sec. 12, T1N, R13W, S.M. it top of Productive Interval 2196' FNL, 2342' FWL, Sec. 12, T1N, R13W, S.M. ~t Effective Depth 1699' FNL, 2081' FWL, Sec. 12, T1 N, R13W, S.M. ~t Total Depth 1691' FNL, 2080' FWL, Sec. 12, T1N, R13W, S.M. 'resent Well Condition Summary 'otal Depth: measured true vertical 5. Type of Well: Development iffective Depth: measured true vertical Exploratory ~" Stratigraphic Service 9738 feet Plugs (measured) 9053 feet 6. Datum Elevation (DF or KB) 32.2' feet 7. Unit or Property Name Corea Creek Federal 8. Well Number Corea Creek Federal #1 9. Permit Number 10. APl Number 50- 133-20487 11. Field/Pool Wildcat/Tyonek 9571', 8644', 6894' ORIGINAL 9571 feet Junk (measured) 8886 feet :asing Structural Conductor Surface Intermediate Production Liner 'erforation Depth: Length Size Cemented 111' 20" Driven 327' 13-3/8" 190 SX 2563' 9-5/8" 870 SX 9688' 7" 1200 SX measured Open: 6620-6650', P/A'd: 7095-7135', 9086-9175', 9320-9350' true vertical Open: 6056-6083', P/A'd: 6478-6514', 8402-8491', 8635-8665' 'ubing (size, grade, and measured depth) 3-1/2", 9.3~, L-80, 5484' ackers and SSSV (type and measured depth) Baker SAB 84-40x32 Packer, 5317' Measured Depth True Vertical Depth .ttachments Description Summary of Proposal X 111' 111' 327' 327' 2563' 2537' 9688' 9003' RECEIVED JUL 0 8 1996 Alaslm 0tl & 8;J Cons, Commi~slo. Detailed Operations Program stimated Date for Commencing Operation 7/8/96 Proposal was Verbally Approved Blair Wondzell 7/2/96 ame of Approver Date Approved 15. Status of Well Classification as: Oil Gas X Service Suspended hereby certify that the foregoing is true and correct to the best of my knowledge. (, _ ~ FOR COMMISSION USE ONLY itions of Approval: Notify Commission so representative may witness Plug Integrity e,~ BOP Test ~ Location Clearance Mechanical Integrity Test__ Subsequent Form Required 10-'-~'O ~' ,ved by Order of the Commission n__~.vid W, johnston 9-403 Rev. 06/15/88 JApproval No. Commissioner Approved Copy Returned '1 ........ Submit in Triplicate Marathon Oil Company Wireline Work Request Well CC-1 Field/Platform: Lease: Site: Sand: Corea Creek A-024399 N. Pad T-2, Test Interval #5 T-3, Test Interval #1, 2, 4 P/A'd Packer: Tbg: EOT: 5316.8' 3-1/2", 9.3#, L-80 5483.4' KB: 32.2' Est Start Date: 7/8~96 Est Comp Date: 7/10/96 OBJECTIVE: 7/2~96 Min ID: Tubing Clear: Fill depth: Tree Connection: JPlace cement plug across T-2, TI #5, blowdown well, and perforate/test T-l, TI #8 2.813" (5369.8', 5445.7 Yes 6893' 3-1/2" 8rd EUE PO I ~NTIAL PROBLEMS: l LAST WELL WORK: 6/25/96 - Run flowing gradient survey PROCEDURE: 1. Conduct safety and environmental meeting. Review procedure. 2. RU 1-1/2" CTU. PT CT to 4000 psig. 3. RIH and tag cement plug at 6893'. PU above cement plug. 4. Mix up 18.1 bbls cement slurry (473' plug) per Dowell design. 5. Spot cement above existing cement plug and across TI//5 while POOH on a 1:1 displacement. 6. Allow cement to set up overnight. 7. PT CT to 4000 psig and RIH and tag top of cement. Cement top should be at 6420'. 8. Pressure up on cement plug to 1000 psig and check for leakoff. 9. PU to 6300' and blow down well w/N2. Leave 800 psig on well. 10. POOH and RD CT. 11. Conduct safety and environmental meeting. Review procedure. 12. RU E-line. 13. Establish communications blackout and MU 30', 2-1/2" Hollow Carrier gun, 6 spf, 60 degree phasing. 14. PT against SI WHP. 15. RIH. 16. Perforate TI//8 (5860-5890') w/1500 psig underbalance. 17. Flow test well. RECEIVED JUL 0 8 1996 QUESTIONS/COMMENTS7 APPROVALS: Contact Mike Olson, 564-6315 (Terry J. Kovacevich) Alaska 011 & Ga8 Cons, Commission An~hor~n~ Fax to KGF Foreman H:excel\wireline\cc\cc- 1 \01 5.xls Corea Creek #1 Hanger: 32.2-32.$ (OD:6.050 ID:2.992) INTERMEDIATE CASING: 327.0 (0D:13.375 Wt:61.00) ~ PRODUCITON CASING: 2563.0 (OD:9.625 Wt:43.00) --/ Tubing: 32.$-890.4 (OD:3.500 ID:2.992) --/ Production Liner: 9688.0 (OD:7.000 Wt:29.00) Tubing: 897.3-5315.7 (OD:3.500 ID:2.992) --/ 80-40 K Anchor: 5315.7-5316.8 (OD:4.750 ID:3.250) Tubing: 5321.7-5369.8 (OD:3.500 ID:2.992) ~ Camco X Nipple: 5369.8-5377.4 (OD:3.950 ID:2.813) Tubing: 5377.4-5445.7 (OD:3.500 ID:2.992) --~ Camco X Nipple: 5445.7-5447.1 (OD:3.950 ID:2.813) --/ Tubing: 5~47.I-5482.7 (OD:3.500 ID:2.992) 'lCore 5825.0- 5885.0 Perf 6620.0 - 6650.0 Cement Plug: 6894.0-7170.0 (OD:6.279) Perf 7095.0 - 7115.0 Bridge Plug: 7170.0-7175.0 (OD:6.279) 8155.0 - 8215.0 Cement Plug: 8644.0-8844.0 (OD:6.184) Sand Plug: $833.0-9524.0 (OD:6.184) Perf 9086.0 - 9175.0 Perf 9320.0 - 9350.0 Marathon Cement Retainer: 9571.0-9575.0 APl # 50-133-20467 ECEIVED ARATHON OIL COMPANY DALLY WELL OPERATIONS REPORT PAGE I OF 1 DATE: 5/25/1996 FIELD: Corea Creek Field WELL Cf: cc.,~l / FILL DEP~ ~'TD 9580' TUBING: 3.5" 5482' CASING: 7.0" 29# .9688' DATE LAST WL WORK: new completion TREE CONDITION: new WORK DONE:__ BENCHES OPEN: none PRESENT OPERATION: pull BPV, pull dummy injection valve, install injection valve PROBLEMS: Found tubing scale in tools SUMMARY OF OPERATIONS GLM arrived, ru BP Lubricator to pull the BPV on well, HWS hung the LubriCator with their mask truck. Pulled the BPV, no problems with pulling the valve. RD GLM. GLM off lease. HWS RU unit spot equipment. MU to tree. PT with WHP, WHP= 0 psig. RIH pulled dummy valve @ 890', RIH with the double-check orifce in mandrel set the valve at 890" POOH, RD unit Recovered 1 cup of scale on tool - scale is from used tubing. Met w/Lee Wiley - plans to level out pad tomorrow. CONFIDENTIAL TIGHT HOLE Date"---~,t~.~ RECEIVEI JUL 0 8 1996 GOOS. Comrtl WELL TESTS: BEFORE: AFTER: COMMENTS: MMSCFPD 0 0 BWPD TP CP DATE DAILY COST: $ 1012 CUM: $ REPORTED BY: CISSELL/OLSON OR fi NAL ARATHON OIL COMPANY DAILY WELL OPERATIONS REPORT PAGE I OF 1 DATE: 5/28/96 FIELD: Corea Creek Field WELL #: CC #1 / FILL DEP~0' PBTD TUBING: ~9.-~~ CASING: 7"- 96~'~ DATE LAST WL WORK:--' '-~'~/96 '-- T~ONDITION: -~o~ WORK DONE: Remove B~II doub~ v-~ve BENCHES OPEN: No~e PREBENT OPERATION.'--~--- ~s~~ ' PROBLEMS: SUMMARY OF O~ i 0700 Begin moving PTS equipment from KGF and Dowell CT from shop to CC//1. Spot equipment. 1830 Received last load. SDFN. Plan to RU equipment Wednesday, followed by blowing down well on Thursday, and perforating Friday. CONFIDENTIAL TIGHT HOLF. RECEIVE JUL 0 8 1996 .~asl~a ~al ~ ,,,~a~ LOllS. Coral D lission WELL TESTS: BEFORE: AFTER: COMMENTS: MSCFPD BWPD TP CP DATE DALLY COST: $ Inc CUM: $ Inc REPORTED BY: Olson O IGtNAL ppDiARATHON OIL COMPANY DALLY WELL OPERATIONS REPORT PAGE I OF 1 TE: 5/29-30/96 FIELD: Corea Creek Field WELL #: CC #1 L DEP~0' PBTD TUBING: ~ CASING: 7"-96~'~ TE LAST WL WORK: ~'-'~/96 ~~ONDITION: -~o~ ORK DONE: Remove B~, i~stal, doubt-- BENCHES OPEN: No~ee OBE~M8: ~one . 0700 5/29/96 RU PTS and Dowell CT. Fill 300 bbl tank for emergency water. 1430 Complete RU. CT BOPs installed, injector head beside well ready to stab. Secure well. SDFN. 0600 5/30/96 Conduct operations, safety meeting. RU injector head. PT CT and test equipment to 500 psig. PT CT and piping to choke manifold to 4000 psig. Good test. Test fire water pump/hose. 0850 RIH w/ 1-3/4" CT w/2-1/4" nozzle and 1-3/4" double check valve at 100-120'/min. At 3000', start N2 injection at 200 scf/min. 1025 Increase N2 to1400 scf/min at 1944 psig, annulus = 0 psig. 1110 800 gal away, 2879 psig, annulus = 6 psig. 1145 1250 gal away, 2655 psig, annulus = 272 psig. 1155 Strong N2 returns, 2369 psig, annulus = 547 psig. Gradually choke well back and begin POOH. Cut N2 rate back to 200 scf/min. SI @ PTS choke manifold. Total fluid produced from well = 172 bbls :(fluid level estimated at 8853'). Annulus = 1456 psig. Begin transferring well fluids (3% KCI) to KGF WD-1 .via vac truck. 1315 CCH. Lost prime on N2 w/ 100 gallons of N2 remaining in tank. WHP = 1750 psig. Transfer additional N2 to tank and pressure up tubing to 2000 psig. Pumped a total of 2100 gallons N2. 1530 RD well and secure well. Plan to RU SWS tomorrow at 7:00 am and perforate and test Test Interval //1. Cost summary: 550 GLM (from 5/25/96) 3500 - Weaver 1000 - Carlile 13500 - Dowell 1300- Qwick (Crane) 7000- PTS (2 days)CONFiDENTiAL 1000 - APC vac truck 27,850 - Total TIGHT HOLE RE. CEIVI JUL 0 8 399 '~, .~s~ ~, e ~ O~S. C~ WELL TESTS: BEFORE: AFTER: COMMENTS: MSCFPD BWPD TP CP DATE DALLY COST: $ 27,850 CUM: $ 28,850 REPORTED BY: Olson SUMMARY OF OPERATIONS 0700 SWS on location. Begin RU. Establish communication blackout. MU 20' and 10' (w/select fire) 2-1/2" hollow carrier, 6 SPF, 60 phasing, 34J Ultrajet RDX, 10.5 gm charges. 1100 PT lubricator. Leak at XO. Attempt to tighten. Still did not test. Wait on 2nd XO from shop. 1320 Wrong XO arrived. Was able to get original XO broken apart and retaped. Installed on well and PT to 2050 psig. Good test. RU SPIDR gauge to flowline. 1420 RIH. Check depth w/TI' and stage collar (6916'). Correlate to exploitation generated computer processed log (CBT dated 4/12/96 is 2' shallow). Tag fill at 9558.5' 1703 PU to 9316.25' to perf 9340-9350' (10') - T-3 TI#1. WHP = 2018psia (1100 psi underbalance). Fire gun. 1718 PU to 9318.1' to perf 9320-9340' (20')-T-3TI #1. WHP = 2018psia (1100 psi underbalance). Fire gun. 1722 POOH. Establish communication blackout. 1840 OOH. All shot fired. No change in WHP. Blowdown lubricator and RD. 1852 Begin flowing well @ 600-800 mscfpd rate on 8/64" choke. WHP decreased to 1510 psia in 45 minutes (est. DD = 47%). SI well to see if pressure would build. Pinc to 1517 psia in 20 minutes, to 1519 in 70 minutes. 2045 Open well on 2/64" choke at 50 mscfpd rate. P dec to 1490 psia in 11 minutes - unable to maintain rate. SI well and monitor P. 6/1/96 0600 P = 1505 psia. SWS on location. Begin RU to perf 30' in T-3, Test Interval #2. 'See attached SPIDR gauge chart. CONFIDENTIAL T GHT HOLE RECEIVE JUL. 0-,3 ~asKa ~ e (~a$ Cons, Coll Annotate mission WELL TESTS: BEFORE: AFTER: COMMENTS: MSCFPD BWPD TP CP DATE DALLY COST: $ 15,700 CUM: $ 45,550 REPORTED BY: Olson/Cissell O?,161NAL 2100 2000 1900 1800 1700 1600 1500 1400 CC-I T-3 Test Interval #1 Flow 600-800 mscfp~ / 8/64" choke Flow 10 rain 2/64" choke / / Blow down lubricator 5ra1~96 ~ ~ I-' ~ HRS 1500 hrs ~. 0 0600 hrs MARATHON OIL COMPANY DALLY WELL OPERATIONS REPORT PAGE 1 OF 1 /DATE: 6/1/96 , FIELD: Corea Creek Field WELL #: CC #1 /FILL DEPTH~~6.7 (6/1/96) TUBING: 3-1/2" 9.3# L-80 CASING: 7"- 9688' /DATE LAST WL WORK: 5/31/96 TREE CONDITION: ~o'o~ / WORK DONE: Perf T-3 TIffS-'---' BENCHES OPEN: T-3 T1#1,2 /PRESENT OPERATIC: ~~o build pressure IPROBLEMS: SUMMARY OF OPERATIONS 0600 SWS on location. Begin RU. 0735 Establish communication blackout. MU 20' and 10' (w/select fire) 2-1/2" hollow carrier, 6 SPF, 60 phasing, 34J Ultrajet RDX, 10.5 gm charges. PT lubricator to 1500 psia. Good test. 0815 RIH. Check depth w/TT and stage collar (6916'). Correlate to Exploitation generated computer processed log (CBT dated 4/12/96 is 4' shallow). Tagged fill at 9566.7'. Short joint at 8700' was not present (open hole logging correction?). Correlate up to 7900' to confirm depth w/several short joints. Depth OK. 1113 PU to 9101.2' to perf 9125-9135' (10') - T-3 TI#2. WHP = 1505 psia (1800 psi underbalance). Fire gun. 1135 Correlate andPUto 9103.1' to perf 9105-9125' (20'). WHP =1505 psia (1800 psiunderbalance). Fire gun. 1140 POOH. Logged stage collar at 6912' and tubing tail at 5460' (24' shallow to DPM). 1200 WHP = 1508 psia. 1300 Establish communication blackout. OOH. All shots fired. 1403 WHP = 1510 psia. Open well and begin flowing at 245 mscfpd rate. WHP dropped to 1286 psia in 62 minutes. 1505 Increase rate to 1.04 mmscfpd. WHP dropped to 759 psia in 37 minutes. (Est dd =72.5%) 1542 ~Sl well. Monitor PBU. 6/2/96 0600 WHP = 805 psia. See attached SPIDR gauge chart. CONFIDENTIAL TIGHT HOLE RECEIVE[ JUt_ 0 1995 Alaska Oil & Gas Cons. Comn Anchorage ~ission WELL TESTS: BEFORE: AFTER: COMMENTS: MSCFPD BWPD TP CP DATE DALLY COST: $ 16,000 CUM: $ 61,550 REPORTED BY: Olson/Cissell CONFiDENTiAL T~GHT HOLE ;EIVED MARATHON OIL COMPANY DATE: 6/2_/96 FILL DEPTH/DATE: 9577' (6~2~96) DATE LAST WL WORK: 6/1/96 WORK DONE: Perf T-3 ThOr2 PRESENT OPERATION: Well SI PROBLEMS: DAILY WELL OPERATIONS REPORT PAGE 1 OF 1 FIELD: Corea Creek Field WELL #: CC #1 TUBING: 3-1/2" 9.3# L-80 CASING: 7"- 9688' TREE CONDITION: Good BENCHES OPEN: T-3 T1#1,2 SUMMARY OF OPERATIONS 0600 SWS on location. Begin RU. 0735 MU GR/CCL tool string. PT against SI WHP (805 psia). OK. 805 RIH 0945 Correlate. Tag bottom at 9577'. Log from bottom to 5200'. 1130 POOH. 1207 OOH. Establish communication blackout. MU 30' 2-1/8" Enerjet III, retrievable strip, 6 SPF, 45 phasing off bottom, 14 gm RDX charges. PT lubricator to 795 psia. Good test. 1255 RIH. Correlate to GR/CCL log (on depth w/Exploitation generated computer processed log). 1423 PU to 9101.4' to perf 9105-9135' (30') - T-3 TI#2. WHP = 797 psia (2800 psi underbalance). Fire gun. POOH. Establish communication blackout. 1605 OOH. All shot fired - strip in tact. RD SWS. 1800 SWS off location 6/3/96 0423 Remove SPIDR from well. Secure well w/lock/chains. Shutdown and lock electrical box. Lock trailer. Clean up location. WHP = 815 psia. See attached SPIDR gauge chart. Correlation of GR-CCL to previous perforating runs: Tiff1 - 1' off depth (5/31/96) TI#2 - on depth (6/1/96) CONFIDENTIAL T GHT HOLE RECEIVE JUL 0 1995 Anchorage I, ission WELL TESTS: BEFORE: AFTER: COMMENTS: MSCFPD BWPD TP CP DATE DAILY COST: $ 21,550 CUM: $ 89,750 REPORTED BY: Olson/Cissell C@NFiDENT~AL T~GHT HOLE ECEIVED JUL 0 ~ ~ ~ons. Commission MARATHON OIL COMPANY DAILY WELL OPERATIONS REPORT PAGE 1 OF I DATE: 6~5~96 FILL DEPTH/DATE: 9577' (6/2/96) DATE LAST WL WORK: 6~2~96 WORK DONE: Perf T-3 TI#2 PRESENT OPERATION: PROBLEMS: 2 Pivot ~lun misruns FIELD: Corea Creek Field WELL #: CC #1 TUBING: 3-1/2" 9.3# L-80 CASING: 7" - 9688' TREE CONDITION: Good BENCHES OPEN: T-3 T1#1,2 SUMMARY OF OPERATIONS 12:30 6/3/96 Blow tubing down to 10 psi in 6 hours. 8:30 6/4/96 WHP = 10 psi. Blow down tubing to 0 psig. 1300 Shoot fluid level on tubing. Fluid appears to be at 6771' - data is questionable though (should be 8821'). Decide not to run downhole gauges. WHP = 0 psig. 1200 6/5/96 RU Dowell N2 pump 1400 'PT line to 2000 psig - fix tree-xo connection. OK. 141,5 Pressure up tubing to 1500 psig w/750 gallons of N2. 1503 I Shutdown pumps and RD. Note CP was on a slight vacuum w/0 psig on well, and had a slight blow w/ 1500 psig on well (pressure gauge still reads 0 psig). This pressure change is due to contraction and expansion on tubing w/pressure on it. Also indicates annulus is still fluid packed - ie. fluid has not leaked out of the annulus into the wellbore. 1530 RU SWS. Conduct safety, environmental meeting. 1740 Establish communication blackout. MU 15' 1-11/16" Pivot guns, 4 SPF, 180 phasing, 22 gm charges. RIH. Reprogram SPIDR and connect to flowline - reading WHP. Check depth at stage collar. 1915 Correlate w/GR/CCL (6/2/96). Set CCL at 9076'. Deploy charges. Work guns up and down for 40 minutes to deploy charges%. No luck. POOH. No indication at TT that charges deployed. 2330 Establish communication blackout. OOH. Checked guns. Charges did not deploy due to bleed screw not being removed from deployment head prior to running guns (operator error). Wait on 2nd head from shop. MU same gun above w/new head. 0030 6/6/96 RIH. Correlate to GR/CCL. Set CCL at 9076'. Deploy charges. Work guns up and down for 25 minutes tO deploy charges. No luck. POOH. 0300 Establish communication blackout. OOH. Gun did not fire. Charges partially deployed. SDFN. Plan to start up at 8:00 am. CONFiDENTiAL T GHT HO BvE JUL 0 8 't99 ~sK~ u~ ~ ~as CoDs. CODD An~nraoe D mission WELL TESTS: BEFORE: AFTER: COMMENTS: MSCFPD BWPD TP CP DATE DALLY COST: 6,650 CUM: $ 89,750 REPORTED BY: Olson/Cissell ,//MARATHON OIL COMPANY DAILY WELL OPERATIONS REPORT PAGE 1 OF 1 DATE: 6~6~96 FIELD: FILL DEPTH/DATE: 9577' (6~2~96) TUBING: DATE LAST WL WORK: 6~2~96 WORK DONE: Perf T-3 TIIK2 PRESENT OPERATION: Well SI, monitoring WHP PROBLEMS: Corea Creek Field WELL #: CC #1 3-1/2" 9.3# L-80 CASING: 7"- 9688' TREE CONDITION: Good BENCHES OPEN: T-3 TI#l,2 SUMMARY OF OPERATIONS 0800 Waiting on blasting caps. SWS did not have any in stock for either the pivot gun or the phased enerjet. Blasting caps coming in from offshore. 1150 Arrive w/blasting caps: Establish communication blackout. MU 15' 1-11/16" Pivot guns, 4 SPF, 180 phasing, 22 gm Ultracap charges. 131.5 RIH. Reprogram SPIDR. Check depth at stage collar. Correlate to GR/CCL (6/2/96). Set CCL at 9076' to perforate 9086-9101'. Deploy charges. Did not open 100%. Work guns for 30 minutes. Charges do not appear to be fully deployed. PU to 9076' and fire guns. No indication guns fired. POOH. No problems entering tubing tail. 1700 Establish communication blackout. OOH. Guns fired! Decide to switch guns anyways. No change in WHP (1530 psia). MU 20' 2-1/8" Phased Retrievable Enerjet III, 6 SPF, 45 degree phasing off bottom, 14 gm charges. 174.5 RIH. Correlate to GR/CCL log (6/2/96). 1954 Set CCL at 9150.4' to perforate 9155-9175'. WHP = 1532 psia. Fire guns. No change in WHP. POOH. '2030 Establish communication blackout. OOH. All shots fired. MU 20' 2-1/8" Phased Retrievable Enerjet III, 6 SPF, 45 degree phasing off bottom, 14 gm charges. 2100 RIH. Correlate to GR/CCL log (6/2/96). 2210 Set CCL at 9130.4' to perforate 9135-9155'. WHP = 1532 psia. Fireguns. 2230 Make log strip from 9370-9000' to show perfs. 2235 POOH. WHP = 1535 psia (3 psi in 30 minutes). 2315 OOH. All shots fired. RD SWS. Clean up area. 2345 WHP -- 1530 psia. Open well for 5-1/2 minutes. SI to fix leak. 2354 WHP = 1280 psia. Open well at +/- 900 mscfpd. 6/7/96 0018 WHP decreased to 1021 psia. SI and monitor WHP. WHP increased to 1025 psia - stable. 0028 Open well up at 968 mscfpd. 0057 'SI at 555 psia and monitor build up over night. See attached SPIDR graph CONFIDENT AL TIGHT HOLE ECEIVE : JUl 0 3 lqqR WELL TESTS: BEFORE: AFTER: COMMENTS: MSCFPD BWPD TP CP D DATE .,~..~.~ ,.,,, ,, ..,,~,, ~;ons. Commission Ancflula9e DAILY' COST: 24,350 CUM: $ 114,100 REPORTED BY: Olson CONFiDENTiAL T~GHT HOLE ';'lSd 9 ~90 96//./9 o 96~9/9 JUL 0 3 199B ~t ~ Gas Cons. Oommimion ~n~horaqe 'MARATHON OIL COMPANY DAILY WELL OPERATIONS REPORT PAGE I OF I DATE: 6~9~96 FI ELD: FILL DEPTH/DATE: 9577' (6/2/96) TUBING: DATE LAST WL WORK: 6~6~96 WORK DONE: Perf T-3 TlCY2 PRESENT OPERATION: Well SI, monitoring WHP PROBLEMS: Corea Creek Field WELL #: CC #1 3-1/2" 9.3# L-80 CASING: 7"- 9688' TREE CONDITION: Good BENCHES OPEN: T-3 T1#1,2 SUMMARY OF OPERATIONS 0840' 6/7/96 WHP = 582 psia. Blowdown well to atm. 0949 WHP = 14.9 psia. SI well and monitor PBU. 1743 WHP = 15.7 psia. Remove SPIDR and take to KGF. PTS off location. 1041 6/8/96 WHP = 17.1 psia. Blowdown to to atm. 1117 WHP = 16.05 psia. 0920 6/9/96 WHP -- 16.8 psia. Blowdown to atm. 1000 WHP = 15.2 psia. RECEIVE JUL 0 3 Anchorage ~ission WELL TESTS: BEFORE: AFTER: COMMENTS: MSCFPD BWPD TP CP DATE DAILY COST: 3,700 CUM: $ 117,800 REPORTED BY: OIson/Cissell MARATHON OIL COMPANY DALLY WELL OPERATIONS REPORT PAGE I OF I DATE: 6/11/96 FILL DEPTH/DATE: 9577' (6/2/96) DATE LAST WL WORK: 6~6~96 WORK DONE: Perf T-3 PRESENT OPERATION: Monitoring pressure falloff FIELD: Corea Creek Field WELL #: CC #1 TUBING: 3-1/2" 9.3# L-80 CASING: 7"- 9688' TREE CONDITION: Good BENC_HF.~ QI:~a~:~ I[-~ PROBLEMS: ~ ~ ~ ~ ~ "~ ...... SUMMARY OF OPERATIONS ~l~g~ 06/10/96 Mobilize equipment and begin RU 0700 106/11/96 Continue RU. Mix 440 bbl 3% KCI water. Reprogram and install SPIDR guage to record WHP. 1035 PT lines to 5000 psig. Good test. Pressure up casing to 1200 psig. Control line pressure = 0 psig. 1045 Inject KCl water down tubing at +/- 5 bpm. TP increased to 1190 psia w/56.8 bbls away (fluid level calculated at 5712'). Slow rate to 1 bpm. CP =800 psig, control line pressure = 0 psig. 1100 Inc inj rate to 4.78 bpm for 8 minutes. TPf =3150 psia. 1108 Dec inj rate to 1.91 bpm for 2 minutes. TPf = 2790 psia. 1110 Dec inj rate to 1.0bpm for 2.3 minutes. TPf -- 2640psia. 1113 SI well for 7 minutes. ISlP = 2510 psia (FG - 0.74 psi/ft). Total fluid pumped = 114 bbls. 1120 Inc inj rate to 1.94 bpm. TPf = 3285 psia. Injection pressure increased 495 psia since step rate test. Decide to run 2nd step rate test. Maintain 1.94 bpm injection rate. 1147 Decrease inj rate to 1 bpm for 2 minutes. TPf = 3052 psia. 1149 SI well for 3 minutes. ISlP = 2915 psia (FG = 0.78 psi/ft). Total fluid pumped = 169 bbls. 1152 Inc inj rate to 2 bpm. Lost Iow pressure pump - picked rate back up to 2 bpm using high pressure pump. 1217 Lost air pressure for controls (air compressor works off of Iow pressure pump). SI. ISlP = 3120 psi. Total of 220 bbl pumped. 1226 Restart 2 hour injection test. Increase rate to 1.5 bpm (decreased injection rate to have enough fluid for 2 hours of injection). Lost prime 20 minutes into test (less than a minute down time). Injection pressure ~ncreased to 3545 psia over 2 hours. 1427 SI well. ISlP = 3370 psia (FG = 0.84 psi/ft). Monitor pressure fall off. Total fluid pumped = 406.5 bbls, 350 bbls injected (hole volume -- 182.5 bbls). 1445' RD Dowell injection lines. RU BOPs and install night cap. 1730 Dowell off location 1800 WHP = 2174 psia, CP = 1000 psia. 0412 06/12/96 Download SPIDR data. WHP = 1263 psia, CP = 1150 psig. Attached is a condesed XLS spreadsheet w/graph (SPIDR-XLS) - There are 2 graphs: 1) shows entire injection test and falloff, and 2) injection test only w/comments. To print these graphs, double click on the graph, then print, otherwise you will get multiple sheets of raw data. Attached is the uncondensed ASC file for the SPIDR (SPIDR.ASC) which can be used for WIP. Falloff analysis: K (to water) = 4.9 md, kh = 370 md-ft, S= -3.5, Boundry at 90'. WELL TESTS: BEFORE: AFTER: COMMENTS: DAILY COST: MSCFPD BWPD TP CP DATE 10,400 CUM: $ 128,200 REPORTED BY: Olson/Stover,, JUL ,,',.. 2as Cons. Commissio SPIDR-XLS Chad 1 CC-I Inj. Test, Falloff 4OOO 3500 300O 2500 2000 1500 2 4 6 8 10 12 14 16 18 Time, hrs Page I 20 SPIDR-XLS Chart 2 CC-1 Inj. Test 3600 34OO 32OO 3OOO 2800 2600 2400 2200 2.1 bpm 1.94 bpm 1.54 bpm 4.78 bpm JF / Lost ~ LP ISIP ~ / pump ~ ~ ~ ISIP x. Lost 0 0.5 1 1.5 2 2.5 3 3.5 4 4.5 Time, hrs Page 1 MARATHON OIL COMPANY DAILY WELL OPERATIONS REPORT PAGE 1 OF 1 DATE: 6/12/96 FIELD: FILL DEPTH/DATE: TUBING: DATE LAST WL WORK: 6/11/96 WORK DONE: Iniectivity test PRESENT OPERATION: Sand plug set, SDFN. PROBLEMS: Corea Creek Field WELL #: CC #1 3-1/2" 9.3# L-80 CASING: 7"- 9688' TREE CONDITION: Good BENCHES OPEN: T-3 T1#1,2 sanded back SUMMARY OF OPERATIONS 0733 IWHP = 1116 psia. Open well up through PTS equipment. P dec to 0 immediately. Flowing small stream of water into tank. 10 bbl in 30 minutes, 10.2 bbls in 60 minutes. 0800 RU Dowell 1-3/4" CTU. Conduct operations, safety, environmental meeting. 0940 SI well - total water produced = 10.5 bbls. Reprogram SPIDR gauge. Fill CT w/3% KCI water. PT to 4000 psig. Good test. 1020 RIH at lO0'/min. 1130 Stop at 5400'. Begin injecting N2 at 1400 scf/m. 1214 400 gallons N2 away, N2 returns at PTS tank, SI N2 pump. Total fluid recovered = 61.75 bbls (CT + annulus = 62.8 bbls-calculated). Leave well open. Flowed an additional 3 bbls back while blowing down well - fluid likely left in lines/separator. 1315 WHP -- O psig. SI well. 1422 WHP = 0 psig. Open choke manifold and RIH w/CT pumping 3% KCI. Tag fill lightly at 9524'. PU to 9500'. Mix 15,400# of 20/40 frac sand (7 ppa) in 52.4 bbls of 3% KCI WF140. Total slurry = 69 bbls. Continue pumping 3% KCI water to fill CT. 1555 At 9500' pump sand slurry at 1.85 bpm. Pump 33 bbls (CT volume + 1 bbl) and begin POOH to 7600' on a 1:1 ratio. Total slurry pumped = 67.7 bbls, followed by 37.3 bbl 3% KCl water. Shutdown pumps and SI production manifold. Sand plug design top = 8833'. 1654 'POOH. Maintaining a couple hundred pounds on well head while POOH. 1800 IOOH. Pressure up well to 600 psia. RD injector head. Place night cap on BOPs and secure well. 1840 SDFN. Dowell off location. Tomorrow (6/13/96) CT: Tag sand plug, blow down tubing and casing. E-line: Perf TI#4 (7095-7115') JUL 0 3 199 Anchorage mission WELL TESTS: BEFORE: AFTER: COMMENTS: MSCFPD BWPD TP CP DATE DALLY COST: 24,700 CUM: $ 152,900 REPORTED BY: Olson ,, MARATHON OIL COMPANY DALLY WELL OPERATIONS REPORT PAGE 1 OF I DATE: 6/13/96 FIELD: FILL DEPTH/DATE: 8833' (6/13/96) TUBING: DATE LAST WL WOrk: 6112J96 WORK DONE: Sand back T-3, TI#l, 2 PRESENT OPERATION: Perf'd T-3, TI#4 PROBLEMS: Corea Creek Field WELL #: CC #1 3-1/2" 9.3# L-80 CASING: 7" - 9688' TREE CONDITION: Good BENCHES OPEN: T-3, TI #4 %3 T1#1,2 sanded back SUMMARY OF OPERATIONS 10800 RU CT unit. WHP -- 600 psia. PT CT to 4000 psia. Good test. Reprogram SPIDR gauge. 0900 RIH at 100'/min. 1115 Tag plug at 8938'. PU to 8860' and pressure up on plug to 1000 psia. Bleed off pressure and RIH and tag plug at 8934'. PUH to 8500'. Strap tank. 1153 Pump N2 at 1400 scl/min. 113 bbls water back when N2 hit surface. Choke well back to 1500 psia. RIH to 8800'. Shutdown N2 and tag plug at 8884' twice. PUll to 8750', start N2 at 1400 scf/min and POOH maintaining 1800 psia on well. 1500 OOH. WHP = 1805 psia. RD. Total N2 pumped -- 2300 gallons. Produced 121.5 bbls (32 bbls from CT, 89.5 bbls from well.) Fluid level estimated at 7186'. 1700 SWS on location. Begin RU. MU PTS logging tool. 1933 ,PT to WHP -- 1927 psia. Good test. RIH at lO000'/hr logging pressure, temperature, gradio. Tag bottom at 8833'. Fluid level at 6865'. 2054 POOH. ;2155 OOH. Establish communication blackout. MU 20' 2-1/2" Hollow carrier, 6 SPF, 60 degree phasing, 10.5 gram 34J Ultrajet charges. 2245 RIH. WHP = 1955 psia. Correlate to Exploitation's computer generated log using CCL/GR dated 6/2/96. 2324 WHP = 1951 psia. Blowdown well to 1271 psia. 0035 6/14/96 Set CCL at 7093.1' to Perf 7095-7115' (T-3, TI //4) WHP = 1326 psia (1250 psia underbalanced). Fire gun. POOH. 0115 OOH. All shots fired. 0130 WHP increased to 1361 psi. Open well on 7/64" choke at +/- 250 mscfpd rate. 0300 WHP - 1004 psia (est 55% DD). SI to monitor PBU. 0600 WHP = 1092 psia. R .CE[VE JUL 0 3 199-~ nission WELL TESTS: BEFORE: AFTER: COMMENTS: MSCF Ar~chorage DALLY COST: $ 34,900 CUM' $ 187,800 REPORTED BY: Olson MARATHON OIL COMPANY DAILY WELL OPERATIONS REPORT PAGE I OF 2 DATE: 6/14/96 FIELD: FILL DEPTH/DATE: 8833' (6/13/96) TUBING: DATE LAST WL WORK: 6/13/96 WORK DONE: Perf'd T-3 TI ~ PRESENT OPERATION: Ran gradient survey PROBLEMS: Corea Creek Field WELL #: CC #1 3-1/2" 9.3# L-80 CASING: 7"- 9688' TREE CONDITION: Good BENCHES OPEN: T-3, TI ~4 T-3 T1#1,2 sanded back SUMMARY OF OPERATIONS 0730 WHP = 1091 psia. Open well at 35.5 mscfpd 800 WHP = 994 psia. Open choke to 8/64" at 289.1 mscfpd Gradually increased choke to 12/64" to maintain 250 mscfpd. 1100 Gas to surface. WHP = 150 psia. Lit flare. 1330 WHP continued to 0 psig as rate decreased to 0 mscfpd. Produced a total of 1-1/8 barrel of water. Sample: 10,300 ppm CI-. 1335 Flare went out. Leave well open. Produced 0.49 mscf gas. 1630 HES arrives on location. RU slickline unit. Conduct operations, safety, environmental meeting. MU tandem LMR pressure recorders, w/ 1-7/8" rope socket, 1-7/8" quick connect, 5' X 1-7/8" stem, and 1-7/8" quick connect. 1740 RIH w/well open (0 flow at surface) and make 5 minute stops at 82', 1000', 2000', 3000', 4000', 5000', 5500', 6000', 6500', 7000', 7500' and 8000'. PU to 7105' (datum) and record ~ressure/temperature for 1 hour. Make 10 minute stops at 7154' and 7054' (above and below TI //5 perfs) Note: slow going in hole past 1100'. 2205 POOH and RD W/L. Note pulling +/- 300//extra weight to 1100'. Download gauges. 2400 HES off location. SI well. Gradient survey results: Fluid level at 4391' MD. BHP @ 7105': Pressure increased from1216.0 psia to 1310.4 psia in 1 hour. WHP = 0, indicating an 'influx of water during W/L work. CO DF. T%AL JUL 0 3 199~ WELL TESTS: MSCFPD BWPD TP CP DA/~ii0~'&ge BEFORE: AFTER: COMMENTS: DAILY COST: 7,900 CUM: 195,700 REPORTED BY: Olson CC #1 FLOWING GRADIENT SURVEY 6/14/96 FLOWING FLOWING FLOWING FLOWING STATIC STATIC STATIC STATIC STOP MD TYD PRES. GRAD. TEMP. GRAD. PRES. GRAD. TEMP. GRAD. NO. (ft.} (ft.) {psia) (psi/ft.) (oF) oF/ft> (psia) {psi/ft.) (oF) oF/ft> I 82 82 18 59 2 1tO00 1tO00 18 0.0001 58 (0.0011) 3 2tO00 1 r993 17 {0.0010) 62.5 0.0045 4 31000 2t324 17 {0.0015) 72.5 0.0302 5 4tO00 3~802 17 86 0.0091 6 5~000 4~661 247 0.2685 97.1 0.0129 7 5~500 5t088 463 0.5052 102.6~ 0.0129 8 81000 5t517 680 0.5058 107.5 0.0114 9 6t500 5r953 896 0.4950 114 0,0149 10 7~000 6~394 1~114 0.4937 119.5 0.0125 11 7~500 6~848 lt332 0.4813 125.5 0,0132 12 8~000 7~324 1~560 0.4779 132.2 0.0141 20:41 7r105 6~488 1~216 125.5 21:41 7~105 6t488 1~310 123 7~154 6~532 1~349 124 7,054 6,442 1,328 122.5 lOO 2O0 7~ o lOOO 2000 4oo0 5000 7000 80O0 CC#1 I ~1, Flowing Gradient Stops --e---7105' md 1 hr stop 6/14/96 ' 200 400 600 800 1,000 1,200 1,400 1,600 1,800 2,000 PRES., (PSIA) ~,, ~ ~ ~ ~ CC-1 Gradient Stops 6/14/96 4O 5O 60 70 80 90 100 110 120 130 140 TEMP., (F) L~as Co[is. Co~mlSSIOll Anchorage MARATHON OIL COMPANY DAILY WELL OPERATIONS REPORT PAGE I OF I DATE: 6/15/96 FI ELD: FILL DEPTH/DATE: 8833' (6/13/96) TUBING: DATE LAST WL WORK: 6/14/96 WORK DONE: Gradient Survey PRESENT OPERATION: Well open to atm. PROBLEMS: Corea Creek Field WELL #: CC #1 3-1/2" 9.3# L-80 CASING: 7"- 9688' TREE CONDITION: Good BENCHES OPEN: T-3, TI #4 T-3 T1#1,2 sanded back SUMMARY OF OPERATIONS 0630 WHP = 22.75 psia. Opbtain gas sample for analysis. 0640 Open well up through PTS and leave open. JUL 0 A~ct~0m~e remission WELL TESTS: MSCFPD BWPD TP CP DATE BEFORE: AFTER: COMMENTS: DALLY COST: $ 3,700 CUM: $ 199,400 REPORTED BY: Olson MARATHON OIL COMPANY DALLY WELL OPERATIONS REPORT PAGE 1 OF 2 DATE: 6/16/96 FIELD: FILL DEPTH/DATE: 8833' (6/13/96) TUBING: DATE LAST WL WORK: 6/14/96 WORK DONE: Flowing gradient survey PRESENT OPERATION: Ran gradient survey PROBLEMS: Corea Creek Field WELL #: CC #1 3-1/2" 9.3# L-80 CASING: 7" - 9688' TREE CONDITION: Good BENCHES OPEN: T-3, TI ~4 T-3 T1#1,2 sanded back SUMMARY OF OPERATION,~ 0730 WHP = 19.7 psia 0625 HES arrives on location. RU slickline unit. MU tandem LMR pressure recorders, w/ 1-7/8" rope socket, 1- 7/8" quick connect, 8' X 1-7/8" stem, and 1-7/8" quick connect. 0700 RIH w/well open (0 flow at surface) and make 5 minute stops at 50', 1000', 2000', 3000', 3500', 4000', 4500', 5000', 6000'. Make 1 hour stop at 7105' (datum). 0937 POOH and RD W/L. No problems RIH or POOH. Download gauges. 1100 HES off location. Water sample from test separator: 11,300 ppm CI-. 1130 APC out to remove remainder of fluid from PTS tank. Gradient survey results: Fluid level at 256' MD. BHP @ 7105': Pressure increased from 2577.8 psia to 2587.2 psia in 1 hour. WHP = O, indicating an influx of water during W/L work. JUL 08 ]99~ Anchorage WEll TCeTe, MSCFPD BWPD TP CP DATE BEFORE: AFTER: COMMENTS: DAILY COST: $ 5900 CUM: $ 201,400 REPORTED BY: Olson CC #1 FLOWING GRADIENT SURVEY 6/16/96 FLOWING FLOWING FLOWING FLOWING STATIC STATIC STATIC STATIC STOP MD TVD PRES, GRAD. TEMP. GRAD. PRES. GRAD. TEMP. GRAD~ NO. (ft.) (ft.) (psia) (psi/ft.) (oF) oF/ft > Ipsia) (psi/ft.) {oF) oF/ft > 1 50 50 20 45 2 1~000 1,000 133 0.1188 52 0.0074 - _ 3 2~0OO 1 ~.993 570 0.4400 65 0.0131 _ 4 2~500 2r475 774 0.4249 71 0.0124 - _ 5 3~O00 2,924 975 0.4465 77 0.0134 - _ 6 3~500 3~371 1~179 0.4559 82 0.0112 _ 7 4,000 3,802 1 ~376 0.4578 87 0.0116 - _ 8 4,500 4~232 1,571 0.4535 91 0.0093 _ 9 5,000 4~661 1 ~765 0.4529 96 0.0117 _ 10 6~000 5,517 2,149 0.4478 104 0.0093 _ 11 7~ 105 6r488 2~578 0.4421 112 0.0082 _ 7,105 6,488 2,587 123 5 600 700 1000 2000 CC ~tl · Flowing } Gradient Stops ~ 7105' md 1 hr sto 6/16/96 500 1,000 1,500 2,000 2,500 3 PRES., (PSlA) CC-1 Gradient Stops 6116/96 6000 70O0 40 · · · · · · 50 60 70 80 90 100 110 120 130 140 TEMP., (F) R MARATHON OIL COMPANY DAILY WELL OPERATIONS REPORT PAGE 1 OF I DATE: 6/17/96 FILL DEPTH/DATE: 8833' (6/13/96) DATE LAST WL WORK: 6/16/96 WORK DONE: Flowin~l ~lradient surve)/ PRESENT OPERATION: RU CT PROBLEMS: FIELD: TUBING: Corea Creek Field WELL #: CC #1 3-1/2" 9.3# L-80 CASING: 7"- 9688' TREE CONDITION: Good BENCHES OPEN: T-3, TI #4 T-3 T1#1,2 sanded back Trucking delays due to no overweight permits SUMMARY OF OPERATIONS 0730 Well open to PTS tank (atm). No fluid produced to surface. 1400 Begin mobing CT equipment. Shipping delays due to Carlile not getting over weight permits and not having CDL licence in possession - pulled over by AST and inspected by DOT. 1830 Equipment arriving on location by Carlile and Peak. Dowell begin RU. 0130 6/18/96 Dowell off location. Plan to start up 10:00 am. CONFAB. ENT AL JUL 0 3 199,S ......... i sion WELL TESTS: BEFORE: AFTER: COMMENTS: MSCFPD BWPD TP CP DA~'~0~'a~e *Dowell/CarlileUOS costs incomplete DALLY COST: $ 5050* CUM: $ 206,450 REPORTED BY: Olson MARATHON OIL COMPANY DAILY WELL OPERATIONS REPORT PAGE I OF I DATE: 6/18~96 FILL DEPTH/DATE: 8844' - 6118/96 DATE LAST WL WORK: 6/16/96 WORK DONE: Flowing gradient survey PRESENT OPERATION: WOC PROBLEMS: FIELD: TUBING: Corea Creek Field WELL #: CC #1 3-1/2" 9.3# L-80 CASING: 7"- 9688' TREE CONDITION: Good BENCHES OPEN: T-3, TI #4 T-3 TI#1,2 P/A'd SUMMARY OF OPERATIONS 0815 Received verbal approval to plug back T-3, TI#1 and 2 from Blair Wondzell. 1000 Dowell on location. RU injector head. 1130 Conduct operations, safety and environment meeting. 1205 Fill coil w/3% KCl water. PT to 4000 psi. Fix leak at tree connection. Retest. Good test. 1320 Blow down CT w/N2 so produced water samples will not be contaminated. Pumped 150 gallons of N2. RIH w/ 1-1/2" CT w/ 1-3/4" cement nozzle at 90'/min. Tag sand plug at 8844'. PUH to 8824' and 1405 establish circulation. Pumped 30.3 bbls (24 bbls CT, 6.3 bbl well + surface lines) 3% KCI water. PTS taking fluid samples every 12-15 bbls produced back. MU 10.5 bbls of cement w/additives (6.2 bbls 3% KCI water, 50 sacks class G cement, 10 gallons D145A 1700 (friction reducer), 30 gallons D159 (fluid loss additive), and 5 gallons D47 (antifoam)). Density = 15.9 #/gal. Pump cement at 0.7 to 1.2 bpm. Displace cement w/3% KCI water. 1725 POOH on a 1'1 displacement as cement reaches nozzle plus 1 bbl. Pumped a total of ~1754 6.5 bbls cement (175' plug) followed by 73 bbls 3% KCI water. Shutdown pumps and continue POOH. OOH. Pressure well up to 300 psi. RD injector head and install night cap. Leave well SI over night. 1943 Wait on cement. Fluid samples taken at surface: ppm bbls prod comments 15807 - Fluid sample from batch mixer- 3% KCI ~ 12800 4.5,a'~ ~z 14000 15.7 10500 1113200 1600007001500 89.6 30.4 77.6 50.6 64.1 C~~¢~' g~~~ '~ JUL 03 Alss~a 0il & Gas Cons, C0~ A~ch0mge WELL TESTS: BEFORE: AFTER: COMMENTS: MSCFPD BWPD TP CP DATE *Dowell/Carlile/UOS costs incomplete ~r~issi0n DAILY COST: $ 4,800* CUM: $ 211,250 REPORTED BY: Olson MARATHON OIL COMPANY DALLY WELL OPERATIONS REPORT PAGE 1 OF I DATE: 6/19/96 FIELD: FILL DEPTH/DATE: 8644' (6/19/96) TUBING: DATE LAST WL WORK: 6/18/96 WORK DONE: P/A'd T-3 TI#1 and 2 PRESENT OPERATION: Well blowndown, open to atto PROBLEMS: Corea Creek Field WELL #: CC #1 3-1/2" 9.3# L-80 CASING: 7"- 9688' TREE CONDITION: Good BENCHES OPEN: %3, TI #4 SUMMARY OF OPERATIONS 0800 Dowell on location. Reprogram SPIDR. WHP = 124 psia. RU CT and PT to 4000 psig w/3% KCI water. 1000 RIH at 100'/min. 1048 At 3490' begin pumping N2 at 250 scf/min. 1152 Tag cement plug at 8644' - good tag. PU to 8594' and increase N2 rate to 1450 scf/min. 1331 Shutdown N2, continue flowing well, and POOH. Pumped 1200 gallons of N2. WHP = 726 psia. 1452 CCH. WHP = 329 psia. SI well. Blowdown CT through PTS. Open well up and monitor well for flow. Total of 150 bbls of water recovered. Water height calculated at 7512'. 1555 Dowell off location. Left BOPs RU, SWS will RU on top of BOPs. 1600 WHP = 100 psia and dropping. No additional water produced. Ranarex gas gravity has decreased from 0.960 to 0.890 and is slowly dropping. 1620 Gas gravity = 0.66, lit flare. Gas rate = 100 mscfpd, 20 psia and dropping. 1700 Gas rate = 16 mscfpd, 14. 7 psia (rate dropping) 0600 6/20/96 Rate = 12 mscfpd, 0 psig, 0 bwpd SWS out tomorrow noon to run TDT. I am not planning on running gradient survey, since we should see fluid level w/TDT. JUL 0 8 199S ,A~s~a Oi~ & Gas Cons. Cor~ A~cho~age D ~ission WELL TESTS: BEFORE: AFTER: COMMENTS: MSCFPD BWPD TP CP DATE DALLY COST: 35,325 CUM: $ 246,575 REPORTED BY: Olson MARATHON OIL COMPANY DAILY WELL OPERATIONS REPORT PAGE 1 OF I DATE: 6/20/96 FILL DEPTH/DATE: 8642' (6~20~96) DATE LAST WL WORK: 6/19/96 WORK DONE: Blowdown well w/N2 PRESENT OPERATION: Ran TDT PROBLEMS: FIELD: Corea Creek Field WELL #: CC #1 TUBING: 3-1/2" 9.3# L-80 CASING: 7"- 9688' TREE CONDITION: Good BENCHES OPEN: T-3, TI #4 SUMMARY OF OPERATIONS WELL TESTS: BEFORE: AFTER: COMMENTS: Schlumberger on location. RU on top of Dowell BOPs. Pressure test against WHP (0 psig). Well flowing 12 mscfpd. SI well. RIH w/TDT logging string. Tag bottom at 8642'. Log up at 1200'/hr from 8600' to 5600'. Fluid level at 6256'. Influx of 48.1 bbls of fluid in 26 hours (1.85 bph). RIH to 8642'. POOH logging at 1200'/hr to 5600'. Fluid level at 6182'. Influx of 2.2 bbls of fluid in 1.8 hours (1.2 bph). Overlay passes. OK. POOH. OOH. RD. Secure well for the night. WHP = 209 psia. Reprogram SPIDR for PBU tomorrow. Leave well SI until midnight. TDT log faxed to Paul Gardner. Note: Sigma value reads high for most of log. SWS Anchorage computing center will try and correct for this in am - need to correct for changes in open hole wellbore diameter. Slight crossover of near and far counts across TI#4. Need to correct for gas in wellbore to look at TI#8 - manually overlaying these curves, there is no crossover - could not adjust in field. 6/21/96 Rate = 20 mscfpd, 1 psig. Plan to flow well at midnight, RU PTA in AM and run survey/PBU. HES called and said they did not have enough people to do this job tomorrow. Gas sample and fluid samples were sent to CTE for analysis. Results to be faxed to Paul Garnder 6~26/96. MSCFPD BWPD TP CP A~chora§e DALLY COST: $ 16,500 CUM: $ 263,075 REPORTED BY: Cissell/Olson MARATHON OIL COMPANY DAILY WELL OPERATIONS REPORT PAGE I OF I DATE: 6/21/96 FILL DEPTH/DATE: 8642' (6/20/96) DATE LAST WL WORK: 6~20~96 WORK DONE: Ran TDT PRESENT OPERATION: PBU PROBLEMS: FIELD: Corea Creek Field WELL #: CC #1 TUBING: 3-1/2" 9.3# L-80 CASING: 7" - 9688' TREE CONDITION: Good BENCHES OPEN: T-3, TI ~4 Both LMR gauges failed to record, surface leaks SUMMARY OF OPERATIONS 0530 PTA on location. RU W/L unit. Hold safety and environmental meeting. Discussed ~rocedure. 0705 Open swab valve and RIH w/tandem LMR electronic gauges. WHP = 1 psig, Q = 20 mscfpd. 1000 Make 5 minute gradient stops at 50', 2000', 4000', 6000', 6500'. Stop at 7105' and record FBHP for 2 hours. 2100 SI well and record PBU for 12 hours. Had lubricator leak above BOPs right after SI well. Closed BOP to 2200 seal. OK. 2230 POOH making 5 minute gradient stops at 6500', 6000', 4000', 2000', 50'. 2300 WHP = 554 psia. RD and down load gauges. Gauges collected one data point on each gauge. 2400 Open well up. Well flowing stable at 28 mscfpd in 30 minutes w/0 psig WHP. 0015 SWS out to look at gauges. Both gauges programmed for a duration of 10 second, instead of 10 days. I Reprogram gauges and will repeat PBU in am. 6/22/96 SI well. 0745 WHP = 458 psia, building 45 psi/hr. Downloaded SPIDR gauge. Surface PBU information not interpretable due to fluid in wellbore. Note: During PBU (6/21/96) WHP built to 450 psia in 10.25 hours. Following the PBU/flowing well, well was SI (6/22/96) and WHP built to 458 psia in 9.78 hours. Also, rate has gradually increased after each shut in: 12 mscfpd (6120/96), 20 mscfpd (6/21/96), 28 mscfpd (6/22/96). dUL 0 WELL TESTS: MSCFPD BWPD TP CP DAT~ilC~10[8O BEFORE: AFTER: COMMENTS: DALLY COST: $ 5,800 CUM: $ 268,875 REPORTED BY: Cissell/Olson SPIDR- PBU Chart 1 5OO 2O0 lO0 CC-1 PBU - 6/21/96 Q=28 mscfpd SPIDR st( Blowdown / ~ ~ecording lubricator CF-20 mscfpd ~ ~ -- 5 10 15 20 25 30 time, hrs Page I pped I~ . MARATHON OIL COMPANY DAILY WELL OPERATIONS REPO'RT PAGE 1 OF 2 DATE: 6/22/96 FIELD: FILL DEPTH/DATE: 8642' (6120196) TUBING: DATE LAST WL WORK: 6/21/96 WORK DONE: PBU - gauCes failed PRESENT OPERATION: Complete PBU, flowing well PROBLEMS: Corea Creek Field WELL #: CC #1 3-1/2" 9.3# L-80 CASING: 7"- 9688' TREE CONDITION: Good BENCHES OPEN: T-3, TI ~ SUMMARY OF OPERATIONS i0800 HES on location. RU W/L unit. Conduct operations, safety, environmental meeting. 10958 MU tandem LMR electronic gauges. 1015 Open swab and test lubricator to 600 psia WHP. Good test. RIH making 5 minute gradient stops at 50', 2000', 4000, 6000', 6500'. 1131 Stop at 7105'. WHP -- 664 psia. Check for leaks - tighten packoff. OK. Bring well on line. WHP bled to 4 psig at 30 mscfpd. Record FBHP for 3 hours. 1438 SI well. Record PBU for 6 hours. 2038 POOH making 5 rain gradient stops at 6500', 6000', 4000', 2000', 50'. OOH. Download gauges and transfer files to Anchorage. Results: FBHP = Increased from 1118 psia to 1171.8 psia in 4.75 hours, WHP = 17 psia during flow period. Rate = 30.5 mscfpd. SBHP = 1770.6 psia (6 hours SI). WHP -- 536 psia. Fluid level while RIH = 4603' md. Fluid level while POOH = 3707' md. PBU analysis are inconclusive. Well would have to be SI for several more days due to the extremely Iow perm. JUL 0 8 '1993 Al~sl(¢ 0il & Gas Cons. Commission Anchorage WELL TESTS: BEFORE: AFTER: COMMENTS: MSCFPD BWPD TP CP DATE DALLY COST: 5060 CUM: $ 273,935 REPORTED BY: Olson CC #1 STATIC GRADIENT SURVEY 6/22/96 STATIC1 STATIC1 STATIC1 STATIC1 STATIC2 STATIC2 S'TATIC2 STATIC2 ST, OP MD TVD PRES. GRAD. TEMP. GRAD. PRES. GRAD. TEMP. GRAD. NO. {ft.} Ift.) (psia) {psi/ft.) (oF) oF/ft > {psia) (psi/ft.} (oF) oF/ft > 1 50 50 598 84 532 57,7 2 2r000 1 ,.993 647 0.0253 64 {0.0103) 542 0.0055 81.5 0.0122 3 4,.000 3r802 694 0.0261 85 0.011 6 661 0.0656 96.5 0.0083 4 6,.000 5~.517 1 ,.254 0.3263 103.8 0.0110 1 ,.368 0.41 22 11 2.5 0.0093 5 6~500 5~953 1 ,.459 0.4706 1 12 0.0188 1 ,.549 0.4147 1 17.7 0.01 19 6 7,105 6,488 1,709 0.4675 1 19.8 0.0146 1,771 0.4166 121.5 0.0071 CC ~1 · Static RIH Gradient Stops [] Static POOH 6/22/96 0 1000 70OO - 200 400 600 800 1,000 1,200 1,400 1,600 1,600 2,000 PRES., (PSIA) 0 1000 2OOO [,~ooo 700O 40 Gradient Stops /[] Static POOH 6122/96 50 60 70 80 90 1 00 110 120 130 140 TEMP., (F) JUL 0 Gas Cons. Commissio Anchorage MARATHON OIL COMPANY DALLY WELL OPERATIONS REPORT PAGE I OF 1 DATE: 6/23/96 FIELD: Corea Creek Field WELL #: CC #1 FILL DEPTH/DATE: 8642' (6~20~96) TUBING: 3-1/2" 9.3# L-80 CASING: 7"- 9688' DATE LAST WL WORK: 6/22/96 TREE CONDITION: Good WORK DONE: PBU BENCHES OPEN: None PRESENT OPERATION: Set BP and cement across TI~4, WOC TI #1, 2, 4 plu~ed back PROBLEMS: SUMMARY OF OPERATIONS 0600 SWS on location. RU equipment. 0730 WHP = 3 psig, Q = 34 mscfpd - gradually declining. SI well. 0750 Conduct operations, safety, environmental meeting. 0805 MU 7" Posiset Plug (Model H405501) and RIH at lO,O00'/hr. Correlate to GR/CCL dated 6/2/96 - corrected to Exploitation generated Icg. 0956 Set CCL at 7144.3' to set plug at 7170'. Power up tool and set plug. Plug set in 55 minutes. POOH. 1135 OOH. WHP = 507psia. RD. 1230 RU Dowell 1-1/2" CTU. Cleaned hard cement out of pump from previous job. PT coil to 4000 psig w/3% KCI water. Good test. 1442 Conduct safety, environmental and procedure meeting. 1510 WHP = 695 psia. RIH 95 fpm pumping 1/4 bpm. Bleed off WHP. 1620 Stop at 7170'. Mix up 15 bbls of 15.8 lb/gal cement per Dowell design (80 sacks class G cement, 8.7 bbls fresh water, 8 gallons D80 (Retarder), 36 gallons D159 (fluid loss additive). 1720 Pump 10 bbls of cement @ 1.15 bpm. POOH on a 1:1 ratio as cement reaches the nozzle plus 1 bbl. Displace cement w/48 bbl 3% KCI water. POOH. 1900 OOH. Leave 100 psig on WHP and RD injector head. Install night cap on BOPs. 0545 6/24/96 WHP = 60 psig. Plan to start up at 6:00 am, pressure up against plug to check for leaks, then blowdown well w/N2. 1 JUL 0.3 ~99S Alssi(¢ Oil & Gss Cons. Cor~ WELL TESTS: BEFORE: AFTER: COMMENTS: MSCFPD BWPD TP CP DATE ~issi0n DAILY COST: 39,600 CUM: $ 313,535 REPORTED BY: Olson MARATHON OIL COMPANY DALLY WELL OPERATIONS REPORT PAGE I OF I DATE: 6~24~96 FIELD: FILL DEPTH/DATE: 6893' (6/24/96) TUBING: DATE LAST WL WORK: 6/23/96 WORK DONE: Set BP and cement plug PRESENT OPERATION: Flowing well to atm PROBLEMS: Corea Creek Field WELL #: CC #1 3-1/2" 9.3# L-80 CASING: 7"- 9688' TREE CONDITION: Good BENCHES OPEN: T-2 TI#5 TI #1, 2, 4 plugged back SUMMARY OF OPERATIONS WELL TESTS: BEFORE: AFTER: COMMENTS: RU injector head. PT to 4000 psig. Good test. Pressure up against cement plug to 1000 psig. Hold for 1 hour. Good test. CP = 1250 psig. Bleed off well and RIH w/ 1-1/2" CT. At 2700', start pumping N2 at 250 scf/min. Tag cement plug at 6894' (15' higher than design). PU to 6800' and increase N2 rate to 1350-1450 scf/min. Strong N2 returns (82.75 bbls back), wait 15 minutes (98 bbls back) begin POOH. Reduce N2 to 500 scf/min in tubing, while holding 750 psig back pressure. OOH. WHP = 1154 psia. SI well. RD CT, injector head and BOPs. Total fluid recovered = 1OO bbls (fluid level estimated at 6207'). SWS on location. RU E-line. Conduct operations, safety and environmental meeting. Establish communication blackout. MU 30' 2-1/2" Hollow carrier, 6 SPF, 60 degree phasing, 10.5 gram RDX 34J Ultrajet charges. PT against SI WHP - 1135 psia. RIH. Correlate to GR/CCL dated 6/2/96 correlated to Exploitation generated log. Tied into tubing tail and short joint at 6700'. Tag cement plug at 6893'. WHP = 1142 psia. Set CCL at 6618.2' to perforate 6620-6650' (T-2, TI#5). Fire guns. WHP increased 30 psi in 30 minutes. OOH. All shots fired. RD. Open well initially at 190 mscfpd. WHP decreased from 1181 to 1035 psia in 45 minutes. Increase flow to 950 mscfpd to blow well down. Gas to surface. Lit flare. WHP = 50 psia at 200 mscfpd, gradually declining. WHP = 21 psia at 27.8 mscfpd, 0 bwpd and stablizing. 6/25/96 WHP = 17 psia at 27 mscfpd, 0 bwpd. MSCFPD BWPD TP JUL 0 B ~cj~ CP DATE DALLY COST: $ 25,000 CUM: $ 338,535 REPORTED BY: Olson MARATHON OIL COMPANY DAILY WELL OPERATIONS REPORT PAGE 1 OF I DATE: 6/25/96 FIELD: Corea Creek Field WELL #: CC #1 FILL DEPTH/DATE: 6893' (6~24~96) TUBING: 3-1/2" 9.3# L-80 CASING: 7" - 9688' DATE LAST WL WORK: 6~24~96 TREE CONDITION: Good WORK DONE: Perf %2, TI #5 BENCHES OPEN: T-2 TI#5 PRESENT OPERATION: Shutdown until CT is available TI #1, 2, 4 plu~l~ed back PROBLEMS: SUMMARY OF OPERATIONS 0900 HES arrives on location. Conduct safety, environment, and operational meeting. Wait on CT to move off location. 1040 RU. MU tandem LMR electronic gauges. 1140 PT against flowing WHP (2 psig). RIH making 5 minute gradient stops at 50', 2000', 4000', 6000'. 1241 Make 1 hour stop at 6600' (above perfs) and 30 minute stops at 6700', 6800' (below perfs). 1443 POOH 1505 OOH. Download data. Decide not to run PBU. 1700 RD. FBHP @ 6635' (mid point) = 756.4 psia, 73% dd assuming 0.46 psi/ft gradient. FBHT = 116F. Rate = 21.7 mscfpd, 16 psia, 0 bwpd at surface. At 6600', the FBHP increased from 697 to 741 psi in 1 hour, indicating an influx of 0.87 bbls of fluid per hour. Stationary stops at 6600, 6700 and 6800' did not indicate any influx through the cement plug. 1701 SI well. WHP = 15.85 psia 0049 6/26/96 WHP = 450 psia (removed SPIDR gauge). Secured well and location. PTS off location. Total gas flared from Test Interval 1, 2, 4, 5 is 79.33 mscf. Work shutdown until CTU is available. CONF ENT AL T GHT HOLE _ JUL 0 8 Alssi ,¢ 0it & 8as Cons. Anchorage r ission WELL TESTS: BEFORE: AFTER: COMMENTS: MSCFPD BWPD TP CP DATE DAILY COST: 8,185 CUM: $ 346,720 REPORTED BY: Olson CC #1 FLOWING GRADIENT SURVEY 6/25/96 FLOWING FLOWING FLOWING FLOWING STATIC STATIC STATIC STATIC STOP MD TVD PRES. GRAD. TEMP. GRAD. PRES. GRAD. TEMP. GRAD. NO. (ft.) (ft.) (psia) (psi/ft.) {oF) oF/ft > {psia) {psi/ft.) {oF) oF/ft > 1 5O 50 2O 58 2 2~000 1 ~993 20 10.0003) 59 0.0005 _ 3 4~000 3f802 32 0.0069 80 0.0116 . 4 6fO00 5f515 475 0.2586 103 0.0134 . 5 6r600 6~039 741 0.5080 116 0.0248 - - 6 6~700 6f127 802 0.6909 1 17 0.01 14 - - 7 6,800 6,21 5 864 0.7045 1 18.09 0.01 24 - - 100 200 ?0~ CC#1 I, Flowing1 Gradient Stops 6/25/96 , 100 ;200 300 400 500 600 700 800 900 1 ,~ PRES., (PSIA) CC-1 I · Flowing Gradient Stops 6/25196 40 50 60 70 80 90 1 O0 110 120 TEMP., (F) JUL 0 99S 0il & Gas Co[Is. CoBBissi0~ A~lchoBge MARATHON OIL COMPANY DAILY WELL OPERATIONS REPORT PAGE I OF I DATE: 7/12/96 FIELD: Cored Creek Field WELL #: CC #1 FILL DEPTH/DATE: 6132' (7/12/96) TUBING: 3-1/2" 9.3#, 5482' CASING: 7"- 9688' DATE LAST WL WORK: 7/11/98 TREE CONDITION: Good WORK DONE: Ran ~lradient survey BENCHES OPEN: TI# 8 PRESENT OPERATION: Blowdown well, grab samples for analysis TI #1, 2, 4, 5 plu~l~led back PROBLEMS: Ta~led bottom 300' above cement plug SUMMARY OF OPERATIONS 0700 ,7/12/96 Dowell RU 1-1/2" CT. 0800 Crane operator arrived, PU grease head stab over tree. PT CT_t~~l~i~l~llilesh water. Displaced the CT with N2. Held envi, ronmental and safety review and.~li~~ 1005 RIH with CT, at 2000 started pumping N2 at a~l~-~~~.______d(~ll to 6132 KB sat down. PUH to 6101'. RIH tagged area again. Sat~jill~~~61~.~J~30~j~yl~f~o~ag). PUH to 6120'. RIH increase N2 rate to 1000 scf/min. Whi~" - - =' ~-- --"'~ '~----~rjltl~l~g~in~o~do~~5~3'. CT pressured up to 3590 psi. Appears that the coil is plugged. ~' ~t~[ ~i~ 1200 POOH with coil. ~ ~V 1249 At surface with coil, CT has 3100 psi on coil, bred to atmosphere slowly. Rig off injector head and pulled the CT nozzle - nozzle clear. Pulled both checks - bottom ball check was fine. The upper check (upstream side) was plugged solid with soft cement. Cut off a couple of feet of coil, slight pressure on coil where cut made. Pumped nitrogen into CT with the coil nozzle exposed at surface. Blew 3-4 bbls water and cement out of the coil. 1444 RU injector head to the tree. RIH with coil, coil has new flapper checks at the end of the coil. note:500 gals of Nitrogen pumped away so far, 1500 gals left on site. 1456 RIH to 2000 ft, start pumping N2 at 250 scf/min. Spot the coil at 6011' kb, start~pumping N2 at 1400 scfm to displace water in well to PTS tank. 1627 PU coil to 5991' KB to make sure coil not plugged. WHP = 106 psi, CT = 2598 psig N2 in tank = 1000 gal., 500 gals used so far on second trip in well, pulled water samples through out. Total 105 bbls to PTS tank. First three samples contained 13000-13600 ppm CI-, last 4 sample~ contained 10000-10600 ppm CI-. Will send a 10000 and 10600 ppm CI- to lab for analysis. 1704 POOH with coil, CT at 4500' reduce N2 rate to 500 scf/min. 1801 Coil at surface, closed the master valve. 1830 RD coil tubing unit. Release CTU. Crane stacking equipment on Dowell's trailers for moving part of the equipment on Saturday to their shop. 1835 PTS opened well up to tank and flare. 1930 Flare went out, PTS to monitor the well over night. Vac truck will be out on Sunday to haul water to the KGF, pad 41-18, CT reel and other equipment will be moved on Monday. '7/13/96 - Well open to atmosphere - no measureable rate. No water produced to surface. 0800 SI well. RD PTS test equipment. IELL TESTS: MSCFPD BWPD ~ CP DATE BEFORE: AFTER: COMMENTS: DALLY COST: $ 24,330 CUM: $ 430,460 REPORTED BY: CISSELL Marathon Oil Company 3201 C Street, Suite $00 Anchorage, Alaska 99503 P.O. Box 196165 Anchorage, Alaska 99519-6165 (90?) S61-S311 July 1, 1996 TO: Howard O~land AOGCC Alaska Oil and Gas Conservation Commission 3001 Porkupine Drive Anchorage, Alaska 99501 , Enclosed are samples of materials collected in Falls Creek. The well this was collected from is Corea Creek #1, Section: 1-2, Township: 1North, Range: 13 West. If you have any questions please contact David Brimberry at 564-6402. 7/1/96 _ Sample Materials for Falls Creek (Coreal Creek #1) Section: 12 Township: 1 North Range: 13 West Company Well Field Sample Type' Depths From: Depths To; 1. Marathon Oil Company Corea Creek #1 FALLS CREEK DRY 1020 2340 2. Marathon Oil Company Corea Creek #1 FALLS CREEK DRY 2340 3300 3. Marathon Oil Company Corea Creek #1 FALLS CREEK DRY 3300 4200 4. Marathon Oil Company Corea Creek #1 FALLS CREEK DRY 4230 5160 5. Marathon Oil Company Corea Creek #1 FALLS CREEK DRY 5190 5670 6. Marathon Oil Company Corea Creek #1 FALLS CREEK DRY 5680 6300 7. Marathon Oil Company Corea Creek #1 FALLS CREEK DRY 6300 7350 8. Marathon Oil Company Corea Creek #1 FALLS CREEK DRY 7350 8200 9. Marathon Oil Company Corea Creek #1 FALLS CREEK DRY 8200 9360 10.Marathon Oil Company Corea Creek #1 FALLS CREEK DRY 9360 9738 INVET2.XLS Alaskt an Domestic Production Marathon Oil Company P.O. Box 196168 Anchorage, AK 99519-6168 Telephone 907/561-5311 June 27,1996 ARCO Alaska, Inc. Attn: Mr. Pat Foley P. O. Box 100360 Anchorage, AK 99510-0360 Bureau of Land Management Attn: Joe Dygas 6881 Abbott Loop Rd. Anchorage, AK 99507-2591 Alaska Oil & Gas Conservation Commission Attn: Mr. Howard OCkland 3001 Porcupine Drive Anchorage, AK 99501-3192 Chevmn USA, Inc. Attn: Mr. Paul Walker P. O. Box1635 Houston, TX 77251-1635 Mr. Cliff Burglin P. O. Box 131 Fairbanks, AK 99707-0131 RE: Marathon Corea Creek Federal No. 1 Well Data Section 12, T1N, R13W Kenai Peninsula Borough, AK Gentlemen: The data listed below is supplied to you for the above mentioned well. We will forward any additional data as it becomes available. Please sign below and return this letter confirming your receipt of the data. Please consider this information confidential and for use only within your organization. Completion Record, June 13, 1996 ............. Blueline & Sepia Logs Fluid Level Determination, June 13, 1996 ........ Blueline & Sepia Logs R e. ga.~..cl~s,// ~., I ///~hn V. Miosse v Exploitation Manager RP CEIVED JUL 0 1 199S At~ska 0il & Gas Cons. Commission Anchorage DLB/kz:EXPL\ccrk0523.1tr Enclosures A subsidiary of USX Corporation Received By: Date: Environmentally aware for the long run. Alask~ Domestic ffroduction Marathon Oil Company P.O. Box 196168 Anchorage, AK 99519-6168 Telephone 907/561-5311 June 21,1996 ARCO Alaska, Inc. Attn: Mr. Pat Foley P. O. Box 100360 Anchorage, AK 99510-0360 Bureau of Land Management Attn: Joe Dygas 6881 Abbott Loop Rd. Anchorage, AK 99507-2591 Alaska Oil & Gas Copservation Commission Attn: Mr. Howard O~kland 3001 Porcupine Drive Anchorage, AK 99501-3192 Chevmn USA, Inc. Attn: Mr. Paul Walker P. O.'Box1635 Houston, TX 77251-1635 Mr. Cliff Burglin P. O. Box 131 Fairbanks, AK 99707-0131 RE: Marathon Corea Creek Federal No. 1 Well Data Section 12, TIN, R13W Kenai Peninsula Borough, AK Gentlemen: The data listed below is supplied to you for the above mentioned well. We will forward any additional data as it becomes available. Please sign below and return this letter confirming your receipt of the data. Please consider this information confidential and for use only within your organization. Completion Record, 31 May 1996.. Blueline & Sepia Logs Completion Record, 6 June 1996 .. Blueline & Sepia Logs Reclards, //John V. Miesse c/ Exploitation Manager DLB/kz:EXPL\ccrk0523.1tr Enclosures Received By: RECEIVED JUN 4 Naska Oil & Gas Go~. ~aissio~ Date: A subsidiary of USX Corporation Environmentally aware for the long run. on <:)il Company ; 6-17-96 ; 2:25PM ; Anchorage~. 907 276 7542;# 1/ 3 P. O. Box 1~1~11 Nmhomge, Alaska MARATHON OIL COMPANY OPE__I=!ATION$ FAX COVER LETrER PIFASE DELIVER THE FOLLOWING PAGES TO: NAME: COMPANY/FIRM: FAX NUMBER: CONFIRMATION NO: FROM: EXTENSION WE ARE TRANSMITTING RECEIVED JUN 1 7 1996 Alaska 0il & Gas Cons. Commission Anchorage PAGES (INCLUDING THIS COVER PAGE) IF TRANSMISSION IS NOT COMPLETE, CALL ANCHORAGE: (907) 564-6326 (Nina) MESSAGE: ANCHORAGE Office: (907) ~1.~11 KEHAI GAS FIELD on Oil Company ; 6-17-96 ; 2:26P~1 ; Anchorage-~ STATE OF ALASKA ALASKA Oil AND GAS GONSERVATION GOMMIS$1ON APPLICATION FOIl SUNDRY APPI:iOYAL$ 907 276 7542 o', ~EXCEL~-ME2B2C.XLS Type of Request: ~'. ~lam~'0f Operator Abandon __ Suspend__ Opem, tlon Shutdown __ Re-enter Suspended Well~ Alter Casing __ Repair Well__ Plugging X Time Extension Stimulate Change Approved Program -- Pull Tubing Variance Perforate Other ,, , s. Type of Well; S. Datum Elevation (DF or KB) MARATHON OIL COMPANY $. Address P. O. Box 196168, Anchorage, AK 89519-6168 4. L~)°ati0n of Well at Surface 1567' FSL, 1573' FEL, Sec. 12, T1N, R13W, S.M. At top of Productive Interval 2196' FNL, 2342' FWL, Sec. 12, T1N, R13W, S.M. At Effective Depth 1699' FNL, 2081' FWL, Sec. 12, T1N, R13W, $.M, At Total Depth ............. !_~91'..F'_N~ 20801FWL seo~:I:2,.:T.!~N_~ R,13w, S,M, Present Well Condition Suiy, mry Total Depth; measured 9738 true vertical 0053 feet feet Development Exploratory..~.X Stratigraphic__ Service Effective Depth: measured 9571 feet true vertical 8886 feet Plugs (measured) 95,71' Junk (measured) 32.2' feet 7. Unit or Properly Name Cores Creek Federal 8. Well Number Coma Creek Federal #1 I 5o.. 133-20467 I '11. Field/Pool I Wlldca _t~ryonek ORIGINAL Ca, lng Structural Conductor Surface Intermediate Production Liner Perforation Depth: Length Size 111' 20" 327' 1 2563' 9.E8" 96B8' 7" measured 7095.7135'. 9086.9175', 9320-9350' tree vertical 6478-6S~4', 8402-8491', 8635-8665' Tubing (size, grade, and measured deplh) 8-t/3", 9.3#, L-80, 5484' Packers and $SSV (type and measured depth) Baker SAB 84-40x32 Packer, 5317' E~lmated Date for Commer,~i~g Operation 6/18/96 A~achme~ Descrip~on Summary of Proposal~ If Proposal was Verbally Approved Name of Approver Date Approved Cemented Mea~ured Depth True Vertbal Depth Driven t90 SX 870 SX 1200 SX 111' 111' 327' 327' 2563' 2537' 9688' 9003' RECEIVED JUN 1 7 1996 Alaska 0il & Gas Cons:' Commission Detailed Operatlone Program__ ,~tatus of Well Classification as: 011__ Ga~ ~ Suspended Servloe '. I hereby o,~i;;y that the foregoing Is true and correct to the beat of my knowledge. Signed ! ,j..._..~ ~_. !(.)9~. ,, ...... J~ ,.T,j!!,e Operations Supefinlendent ~%~ C~ FOR COM~.~IO~ '~S-E ~NLY ~nditions of A~rova~o~ommmlon eD representative may withes Plug In~gH~ BOP Test Lo,arian C~ar~ce M~hanlcal I~l~rl~ T~ Sub~eq~ Form R~uired 10---~O ~ Original Signed By ~prove~ by ~der of the Commission David W. Johnston Comml~loner IApproval No. Sub~ffin T~Iplicate 171 10-403 Rev. Approved Copy Returned on Oil Company 6-17-06 ; 2'26P~ Anchorage~ . 907 276 7542;# 2/ 8 Marathon OII Company Wirellne Work Request Well CC-1 Field/Platform: Corec Creek Lease: A-O24399 Site: N. Pad Sand: T-3, Test Interval #4 T-3, Test Interval #1, 2 (sanded back) Packer; 5316.8' Tbg: 3-1/2", 9.8#, L-BO EOT: ~83.4' KB: 32.2' Est Start Dote: 6/18/96 ESt Comp Date 6/18/96 MIn ID: 2.813" (5369.8', 5445, Tubing Clear: Yes Fill depth: 8833' Tree Connection: 3-1/2" 8rd EUE OBJECTIVE: 6/17/95 I Place cement plug above T-3, TI #1, '~;"blOwdown well and test TI#4; place cement plu'~-~-~;~'~] TI ~4 if wet, peff a0~J~_~..~J. ~8 J ~TENTIAL P~BLEMS: ...... ' ..................... High pressure gas, ~lcklng ~T,' expios~s ~ST WELL WORK: ....... 6/15/96 - Run flowing gradient' su~ey ...... PROCEDURE: ....... ' ......... 1. Conduct safety on~i'~nviror~'~ental meeting. Review procedure. 2. RU 1-1/2" CTU, PT CT to 4000 PSlO. 3. RIH and tag sand plug?PO above sand P'iug, 4. Mix up 250' cement plug per Dowell design, 5, Spot cement above sand plug while POOH, CBU, 6, Allow cement to set up overnight, 7, I~IH and tag top of cement. 8, PU to 84[X]' and blow down well w! N2. FlOw test well, g. Test well, If well flows, perform FBHP suwey and PBU, else continue w/procedure. ]0, RU E-line and RIH and set bridge plug below TI #4 (7]40'). Dump ball or place cement using CT across and above TI #4 ports, 11. Allow cement to set up overnight 12. Swab well down to 5000' or If CT Is available,' blowdown well to 6500' w/N2, 13. RU E-line and perforate TI #8 (5855-5885'] w/1500 pslg underbalance. 14. Flaw test well. ::)UESTIONS/COM Mt~NTS? APPROVALS: Contact Mike Olson, 564.63!5 (Terry J. Kovacevlch) RECE !1 ~ . uup~ Alaska Oil & Anchc ED Fax to KGF Foreman H:excell Alaska Domestic Prouuction Marathon OilCompany P.O. Box 196168 Anchorage, AK 99519-6168 Telephone 907/561-5311 May 23, 1996 ARCO Alaska, Inc. Attn: Mr. Pat Foley P. O. Box 100360 Anchorage, AK 99510-0360 Bureau of Land Management Attn: Joe Dygas 6881 Abbott Loop Rd. Anchorage, AK 99507-2591 Alaska Oil & Gas Conservation Commission Attn: Mr. Howard Oekland 3001 Porcupine Drive Anchorage, AK 99501-3192 Chevron USA, Inc. Attn: Mr. Paul Walker P. O. Box 1635 Houston, TX 77251-1635 Mr. Cliff Burglin P. O. Box 131 Fairbanks, AK 99707-0131 RE: Marathon Corea Creek Federal #1 Well Data Section 12, T1 N, R13W Kenai Peninsula Borough, AK Gentlemen: This final mud log report is supplied to you for the above mentioned well. Please sign below and return this letter confirming your receipt of the data. Please consider this information confidential and for use only within your organization. Exploitation Manager DLB/kz:EXPL\ccrk0523.1tr Enclosures Received By: Date: MAY 2 3996 A subsidiary of USX Corporation aska 0il & Gas Cons. CommissioB Angora,ge Environmentally aware for the long run. CONFidENTIAL TiGH~'T HOLE MARATHON OIL COMPANY COREA CREEK FEDERAL NO. 1 MICROFILMED I ' Section 12-T1N-R 13W, SM Falls Creek Kenai Peninsula Kenai Borough, Alaska MAY 28 1996 Oil & Gas Cons. Commissior~ .... AJaBI(a Oil & Ga~, C, un~, commissiOl~ Epoch Well Logging, Inc. TAblE OF CONTENTS 1. Resume 2. Summary and Conclusions 3. Electric Log Tops 4. Daily Chronology 5. Mud Record 6. Bit Record 7. Deviation Survey Record 8. Morning Reports 9. Drilling Curve 10. Formation Log 11. Formation Log - TVD 12. Drilling Dynamics Log t~AY £8 ]996 Alaska Oil & Gas Cons. Commi~O~ WELL RESUME OPERATOR: WELL NAME: FIELD: LOCATION: COORDINATES: ELEVATIONS: COUNTY: STATE: APl INDEX: SPUD DATE: COMPLETION DATE (TD): TOTAL DEPTH: CONTRACTOR: RIG NO,: RIG TYPE: COMPANY GEOLOGIST: COMPANY ENGINEERS: RIG TOOLPUSHERS: MUD COMPANY: MUD ENGINEERS: MUD TYPES: HOLE SIZES: CASING DATA: MUDLOGGING SERVICES: TYPE UNIT: UNIT NO.: LOGGING GEOLOGISTS: SAMPLE TECHNICIANS: ELECTRIC LOGS BY: LOG INTERVALS: LOG SUITE RUN: CORE INTERVALS: CORING COMPANY: DST INTERVALS: BO'FI'OM HOLE FORMATION: WELL STATUS: MARATHON OIL COMPANY COREA CREEK FEDERAL NO. 1 FALLS CREEK SEC. 12, T1 N-R13W, SM 1573' FSL, 1567' FWL K.B. = 280' GL = 246' KENAI BOROUGH ALASKA 50-133-20467 FEBRUARY 26, 1996 APRIL 1, 1996 9,738' POOL ARCTIC ALASKA, INC. 122D SCR DIESEL-ELECTRIC RICHARD BRIMBERRY LANCE LAMONS / PETER BERGA GARY GOERLICH / HOLLY WALDON MI DRILLING FLUIDS, INC. ROBERT WILLIAMS / KEN BUTLER GEL / WATER TO 2585'; LIGHTLY TREATED TO 2818'; POLYMER FLO PRO TO 9738' 17 112" TO 327'; 12 1/4" TO 2585'; 8 1/2" TO 9738' 20" AT 74'; 13 3/8" AT 327'; 9 5~8" AT 2563' EPOCH WELL LOGGING, INC. FID GAS SYSTEM, TOTCO DATA SYSTEM 8 CRAIG ANDERSON / SCO'FI' CARNEY BILL STEVENS/ARNOLD KOSO SCHLUMBERGER 327' - 2585'; 2585' - 9738' LDT-CNL,CMR-GR, FMI 5825' - 5860' AND 8152' - 8212' EASTMAN CHRISTIANSEN NONE LOWER TYONEK PRODUCTION LINER - TESTING FORMATION TOPS / CORRELATION SUMMARY MARATHON OIL COMPANY COREA CREEK FEDERAL NO. I FORMATION MD TVD BELUGA 2145' 2110' TYON EK 5612' 5151' TOTAL DEPTH 9738' 9023' DAILY CHRONOL OG Y MARATHON OIL COMPANY COREA CREEK FEDERAL NO. I 2-28-96: 2-29-96: 3-01-96: 3-02-96: 3-03-96: 3-04-96' 3-05-96' 3-06-96: 3-07-96: 3-08-96: 3-09-96: 3-10-96: 3-11-96: 3-12-96: 3-13-96: Rig up and run 13 3/8" casing to 327'. Circulate and rig up Dowell. Pump cement and rig down Dowell. Rig up diverter line. Nipple up and test BOPE. Drill out of 13 3/8" casing with 12 1/4" bit. Drill ahead from 327' to 1224' at report time. Drill ahead from 1224' to 2122' at report time. No problems. Drill ahead with 12 1/4" hole from 2122' to 2584' at report time. Circulate and condition hole. POOH for Schlumberger E-logs. Run Schlumberger E-logs. Circulate and condition hole. Continue to run E-logs. Circulate and reduce mud weight. Run 9 5/8" casing. Rig up Dowell and mix and pump cement. Displace with 45 bbls. of mud. Pump spacer and cement to auger. Open annular valve and drain to cellar. Flush with water and rig down Dowell. POOH. Casing shoe at 2563'. Rig down diverter system and install stack and casing spool. Test to 2700 psi. Nipple up BOPE. Install flow line to mud pits and trip tank. Continue to nipple up BOPE. Complete nippling up BOPE. Make up BHA anf test MWD tools. RIH and prepare to drill out cement. Drill out cement. Drill ahead with 8 1/2" hole from 2563' to 2818'. Replace lightly treated mud system with Polymer FIo Pro mud system at 2818'. Drill form 2818' to 3073'. Drill from 3073' to 3342' Circulate bottoms up. POOH for new bit. Pick up NB #5 and RIH. Drill from 3342' to 3516'. Drill from 3516' to 3855'. Make wiper trip to shoe. Run back to bottom and drill ahead from 3855' to 4411' Drill from 4411' to 4967' and make a wiper trip to shoe. Continue drilling from 4967' to 5162'. i? AIL Y CHRONOL OG Y MARATHON OIL COMPANY COREA CREEK FED L NO. I 3-14-96: 3-15-96: 3-16-96: 3-17-96: 3-18-96: 3-19-96: 3-20-96: 3-21-96: 3-22-96: 3-23-96: 3-24-96: 3-25-96: 3-26-96: 3-27-96: 3-28-96: 3-29-96: 3-30-96: Drill ahead from 5162' to 5247'. Circulate bottoms up and POOH for NB #8. Pick up BHA and RIH. Drill from 5247' to 5349'. Drill ahead from 5349' to 5825' and make a wiper trip to shoe. RIH and circulate and condition hole for Core No. 1. POOH to pick up core barrel. RIH and core from 5825' to 5860'. Core from 5860' to 5885'. POOH with core. Lay down core and pick up new BHA. Drill ahead with 8 1/2" bit from 5885' to 6104' at report time. Drill from 6104' to 6467'. Circulate hole and make a wiper trip. Run back to bottom and drill to 6626' at report time. Drill from 6626' to 6838' and make a wiper trip to shoe. Drill ahead from 6838' to 7055'. POOH for new bit at 7055'. Pick up BHA and RIH with NB #8. Drill ahead from 7-55' to 7321' at morning report. '~ Drill from 7321' to 7518'. POOH for new bit. RIH with NB #9 and drill ahead from 7518' to 7521' at report time. Drill ahead from 7521' to 7532'. Drill from 7532' to 7654' at report time. Drill from 7654' to 7665' and POOH for new bit. RIH with NB #10 and continue drilling form 7665' to 7904'. Drill ahead with mud motor from 7904' to 8155'. Circulate and condition hole to take Core No. 2. POOH to pick up core bit. RIH with core bit and take core fron 8155' to 8212'. POOH and lay down Core No. 2. RIH with NB #11 and drill ahead from 8212' to 8558'. Drill ahead from 8558' to 8740 and make a wiper trip. RIH and weash from 8700' to 8740'. Drill ahead to 9019'. Circulate bottoms up and POOH for new bit. RIH with NB #12 and drill ahead from 9019' to 9286' at report time. AIL Y CHRONOLOGY ,i MARATHON OIL COMPANY COREA CREEK FEDERAL NO. I 3-31-96: 4-01-96: 4-02-96: 4-03-96: 4-04-96: 2. 4-05-96: 4-06-96: 4-07-96: 4-08-96: 4-09-96: Drill ahead from 9286' to 9365'. Make short trip and run to bottom. Drill ahead to 9526'. Circulate bottoms up. POOH for new bit. POOH for new bit. Change BHA and RIH with NB #13. Drill ahead from 9526' to 9694' at report time. Drill from 9694' to the total depth of 9738'. Short trip 20 stands and circulate bottoms up. POOH for E-logs. Ream tight spots in hole. Circulate and condition hole for E-logs. Run Schlumberger wireline logs. Make log run number I and log run number Complete log run number 2. RIH and circulate bottoms up. POOH for log run number 3. Complete log run number 3. Pick up tools for log run number 4. Stuck tools on log run number 4. Fish for logging tools. Recover stuck logging tools. RIH and circulate and condition hole. POOH for casing run. Rig up to run 7" casing. Rig up Weatherford and run 7" casing. Complete casing run. Rig up and cement 7" casing. DATE 2/25196 2/26196 2/27/96 2/28/96 2/29196 3/1/96 3/2/96 3/3/96 3/4/96 3/5/96 3/6/96 3/7/96 3/8/96 3/9/96 3/t 0196 3/11/96 3/12/96 3/13/96 3/14/96 3/t5/96 3/t6/96 3/t 7/96 3/18/96 3/19/96 3/20/96 3/21/96 3/22/96 3/23/96 3/24/96 3/25/96 3/26/96 3/27/96 3/28/96 3/29196 3/30/96 3/3t/96 4/1/96 DEPTH SURFACE 260 327 327 946 1966 2507 2585 2585 2585 2585 2585 2818 2818 3342 4310 4998 5254 5825 5847 5987 6500 6995 7194 7518 7521 7529 7607 7803 8155 8206 8415 9019 9210 9528 96t6 9738 8.6 8.9 9 8.6 8.9 9.3 9.4 9.6 9.5 9.7 9.7 9.7 9.7 9.4 9.7 10.1 10 10 10 10 10.1 10.2 10.1 10.4 10.2 10.4 t0.3 10.3 t0.3 10.3 10.3 10.3 10.4 t0.4 10.5 10.8 10.7 83 75 49 68 72 58 45 49 46 45 60 54 42 57 58 59 49 50 54 53 58 64 71 79 68 76 69 65 68 73 81 62 76 75 70 65 68 11 12 13 13 14 26 16 19 t4 10 10 13 11 10 11 10 9 9 9 11 13 19 16 24 18 19 18 20 30 27 25 23 25 25 26 2t 24 26 26 19 16 15 20 9 13 7 13 16 18 16 36 42 42 42 44 49 44 53 54 42 47 47 35 36 37 32 26 23 MARATHON OIL COMPANY COREA CREEK FEDERAL NUMBER DALLY MUD SUMMARY e,B.s FL ~ WATER _.SO 12~24 18 3 97 O 15~,31 15.6 5 95 112 12/42/49 14.6 5 95 112 11/27143 15.2 2.5 97.5 1/2 9t22/31 14.4 4 96 1/2 7/24/43 t4.4 8 92 112 5/9/12 12 8 92 3/4 6t11/14 12.4 9 91 3/4 4/8/12 10.4 8 92 1/2 5\10 6.2 10 90 1/2 8~2 6.6 10 90 112 6\15 7.4 10 90 1/2 5\t2 7.6 10 90 1/2 24/28t30 7.4 6 94 9.4 19/27t30 6.6 t0 90 TRACE 21/25t30 6.6 12 88 1/2 16/25/3t 6.4 t2 88 1/4 15/25/30 4.8 12 88 1/2 16/31/37 6.4 13 87 114 t5127t38 8.6 t4 86 0 t6/29/46 8 t4 86 1/4 30\53 9.8 15 85 TRACE 26N4 9.6 15 85 TRACE 23\52 5 16 94 tl4 20~42 4.8 t4 86 1/4 25~6 5 16 84 114 25~42 4.8 15 85 114 24N8 4.8 t5 85 114 15\38 4.8 15 85 114 16~28 5 t5 85 TRACE 15/29149 5.4 16 86 t/4 18/24/40 4.8 t6 84 1/2 22/29/52 5 17 87 112 23/28/49 4.8 17 83 3/4 26/43/65 4.8 19 8t 3/4 2t/4715t 5.8 2t 79 3/4 26/47/52 7.6 21 79 1/2 23 25 20 20 22.5 20 20 20 20 25 27.5 27.5 27.5 TRACE TRACE TRACE 2.5 2.5 5 7.5 7.5 10 10 12.5 12.5 12.5 12.5 12.5 15 t5 t5 14 12.5 12.5 t5 t5 14 9.3 9 8 7.9 8.7 9 10.3 9.8 9.2 9.1 8.7 8.7 10.7 9.4 9.2 9 9.1 9.2 9.3 9.4 9.3 9.4 8.9 8.5 8.3 8.3 8.2 8.3 8.2 8.2 8.1 8.1 8 8 8.3 7.7 7.3 0.2 0.1 0 0 1.1 1.1 1.4 1.1 1 0.8 0.4 0.5 2 0.6 0.4 0.2 0.2 0.3 0.5 0.6 0.5 0.5 0.4 0.3 0.3 0.3 0.5 0.4 0.4 0.5 0.3 0.2 0.2 0.2 0.2 0 0 pfl MI' .2/.3 .t /.3 0/.2 0/.2 .1 /.9 .3 / .4 .6 ! .6 .4 t 1.5 .3/t.6 .2/1.6 .4 / 2.0 .5/2.2 1.6/5.0 .2/.8 TR 1.5 TR / .5 .t /.9 .2/t.t .2/1.1 .3/1.3 .2/1.3 .3/1.6 .1 1 1.2 TR / 1.1 TR / .8 TR / 1.0 TR / .9 TR / .9 TR / .2 TR / .9 0/.8 0/.7 0/.6 0/.5 0/.7 0/.9 0 / .8 800 1000 900 900 900 800 900 900 900 800 800 800 900 58000 41000 48000 43000 42000 45000 47000 49000 41000 50000 52000 48000 47000 46000 48000 4700O 46000 46000 45000 46000 46000 46000 4t00O 42000 o 40 160 t6o 200 16o 140 200 240 --~-~. 12o 120 80 12o 80 80 80 6o 60 60 2o 6o TRACE 80 120 160 160 160 160 t60 160 t80 28O 180 'f$0 120 MARATHON OIL COMPANY COREA CREEK FEDERAL NUMBER 1 DAILY MUD SUMMARY 4/2/96 9738 10.9 89 30 48 22~55 5 23 77 3/4 15 7.9 0 4/3196 9738 10.7 77 15 34 22'~52 5 2t 79 3N 15 7.8 0 4/4/96 9738 10.8 80 20 48 24\56 4.8 22 78 3N. 15 7.7 0 4/5196 9738 t0.8 76 21 43 20~48 5 22 78 3~1. 15 7.8 0 4/6196 9738 10.8 89 22 54 26~59 4.8 22 78 3~ 15 7.8 0 4/7196 9738 10.8 90 18 42 24/55 4.6 22 78 3~4 15 7.9 0 0/1.0 0/1.1 0/1.2 0/1.1 011.2 0/1.3 42000 41000 44O00 42000 46000 44O00 32O 36O 400 400 400 440 COREA CREEK FEDERAL NUMBER 1 BIT RECORD BIT # SIZE MFG TYPE SERIAL # NOZZLES OR TFA IN OUT FTG HRS AVG GPM FT~HR IR I DULL CONDITION / O_~R DC LQ.C B/_..~S(~116' DC RPLD 1_ 17 112" HTC 2 12 1/4" RBI _3 12 114" RBI _4 8 tl2" RBI _5 8 1/2" 6_ 8 1/2" RBI R._.~R 8 112" BHI _7 8 1/2" RBI _8 8 tl2" RBI 9 8 tl2" REED 10 8 1/2" RBI R.._~R 8 1/2" BHI 1t 8 1/2" HTC 12 8 1/2" RBI 13 8 112" RBI GTX-t C86XK 20120/20 C-05 BJ-680 15t15115 C-01 BH-772 15/15/15 C-05 BK-493 121t2/t2 C-1 BJ-607 13113/t3 C-1 BJ-633 13/t3/t3 SC 712 117740 0.9 C-1 BJ-610 13/13/13 C-1 BJ-609 t 3/13/13 HP 2t G PH 6372 13/t3/13 C-1 VLRG BJ-608 14t14/14 SC 712 117740 0.9 ATM GT09 F 96 CM t4/14/t4 CI-VLRG BJ-498 t4/14/t4 C2-VLRG BJ-500 141t4/14 35 327 292 9 32.4 620 327 2585 2258 34.5 65.4 605 2585 2585 0 0 0 650 2585 3342 757 9.5 79.7 430 3342 5247 t905 31 61.45 430 5247 5825 578 18.5 31.24 550 5825 5885 60 21.5 2.7 325 5885 7055 1170 39.5 29.62 497 7055 75t8 463 19.5 23.74 471 753t 7665 134 11 12.18 471 7665 8155 490 20 24.5 430 8155 8215 56 9.5 5.9 300 8215 9019 804 20 40.2 430 9019 9528 509 24.5 20.44 515 9528 9738 210 13.7 12.35 515 1 1 NO A E 1 0 Tn 2 2 NO ALL F 2 NO '~[ I 1 NO ALL E IN NO TD 2 2 2 NO E IN NO BHA 2 2 NtA A EFF 1 NIA HRS I 1 WT A EFF IN N/A CORE PT, 1 2 WT ALL FAILED IN NONE NO CONES~ SPINDALS WORE DOWN APROX 1" 5 6 WT A EFF IN BT 2 3 BT A FAILED IN CD 1&2 2 2 WT ALL EFF 1 3BT.#2 3 3 BT IR'S EFF 1 NONE 2 2 WT ALL EFF IN NONE HRS ROP CORE PT HRS ROP TD MARATHON OIL COMPANY COREA CREEK FEDERAL #1 DRILLING TIME SCHEDULE DEPTH VS TIME Thousands -2 -4 -6 -8 -10 .12f 0 DRILLING 12 1/4" HOLE - - RAN-E-lOGS.' SET 9 5/8"-CASING AT 25'84 ....................................... DRILLING 8 1/2" HOLE. CUT CORE NO. 1 FROM 5825' - 5885' 4 8 12 16 2O 24 CUT CORE NO. 2 FROM 8155' - 8212' RAN SCHLUMBERGER E-LOGS AT TD I I RAN 7" CASING AT TD TOTAL DEPTH: 9738' 28 32 36 4O Days 3-01-96 to 4-02-96 MARATHON OIL COMPANY COREA CREEK FEDERAL #1 DAILY FOOTAGE EPOCH WELL LOGGING INC. HUNDREDS 1,000 8OO 600 4OO 2OO 0 1 5 9 13 17 21 25 29 33 37 DAYS 3-01-96 TO 4-02-96 WELLPATH DATA Incl. Azi. Coordinates reft. Sta. M.D. Angle Angle +N,-S +E,-W TVD Sec. Feet Deg. Deg. Feet Feet Feet Feet 1 0 0.00 0.00 2 330 0.00 0.00 3 377 0.28 300.64 4 840 0.47 288.90 5 1118 0.53 297.68 6 1211 2.44 320.03 7 1304 4.61 317.72 8 1397 6.60 316.07 9 1489 9.76 314.17 10 1581 12.88 311.31 11 1673 13.75 316.69 12 1767 15.81 215.32 13 1860 17.62 313.99 14 1953 19.08 314.37 15 2046 21.06 312.87 16 2139 23.68 314.03 17 2231 24.22 314.81 18 2323 27.02 313.00 19 2416 26.96 313.85 20 2509 27.22 313.81 21 2602 28.61 314.20 22 2695 28.32 314.27 23 2787 27.66 313.62 ~4 2BBO 27.41 314.34 2972 26.81 313.70 2~ 3065 26.41 313.15 27 3157 25.59 312.09 28 3251 25.35 312.18 29 3344 25.26 312.03 30 3437 27.76 314.40 31 3531 28.62 314.75 32 3623 29.77 315.35 33 3715 29.70 312.71 34 3808 30.40 312.67 35 3901 31.12 312.59 36 3993 29.24 313.62 37 4087 30.28 314.33 38 4179 30.92 313.76 39 4271 29.67 315.12 40 4363 30.30 314.55 41 4457 31.40 314.86 42 4550 30.70 314.93 43 4642 29.27 313.79 44 4734 30.20 313.65 45 4828 31.00 313.78 46 4920 30.05 315.07 47 5013 30.85 315.53 48 5106 30.12 317.10 49 5200 30.91 316.68 5303 31.45 317.14 0 0 0 0 0 0 330 0 0 -0 377 0 1 -3 840 2 2 -5 lllB 3 4 -7 1211 5 B -11 1304 10 15 -17 1396 lB 24 -26 1487 29 36 -39 1578 44 51 -55 1667 62 68 -71 1758 83 87 -90 1847 105 107 -111 1935 130 129 -134 2023 156 154 -160 2109 186 1BO -187 2193 217 207 -215 2276 251 236 -246 2359 286 266 -277 2441 321 296 -308 2524 358 327 -340 2605 395 357 -371 2687 431 387 -402 2769 467 416 -432 2851 502 445 -462 2934 537 472 -492 3017 570 499 -522 3102 604 526 -551 3186 636 554 -581 3269 671 585 -613 3352 708 617 -645 3432 746 649 -678 3512 785 680 -712 3592 823 713 -747 3672 862 744 -781 3752 901 777 -B14 3833 940 809 -848 3913 979 842 -BB1 3992 lO1B 874 -914 4072 i057 908 -948 4152 1098 942 -982 4232 1138 974 -1015 4312 1177 1005 -1048 4392 1215 1039 -1082 4473 1255 1071 -1116 4552 1295 1105 -1149 4632 1335 1139 -llB1 4712 1375 1174 -1214 4793 1417 1213 -1250 4881 1463 Closure Dist. Dire. Feet Deg. Rate Change Total Incl. Azi. D.L. TFO Oeg/lO0 Ft Deg/lO0 Ft Deg. 0 O.O 0 0.0 0 300.6 3 293.5 6 293.6 B 300.3 13 308.0 22 311.5 35 312.8 53 312.7 75 313.1 99 313.8 125 314.0 155 314.0 187 313.9 222 313.9 259 313,9 299 313,9 341 313.9 384 313,9 427 313,9 471 313.9 515 313,9 0.00 0.00 0.0 0,00 0.00 0.0 O. 60 126.30 O, 6 0.04 2.54 0,0 0,02 3,16 0,0 2,05 24,03 2.1 2.33 2.48 2.3 2.14 1.77 2.1 3.43 2,07 3.4 3.39 3.11 3.4 0,95 5.85 1.6 2.19 1.46 2.2 1,95 1,43 2,0 1.57 0.41 1.6 2.13 1.61 2.2 2,82 1,25 2,9 0.59 0.85 0,7 3,04 1,97 3,2 -0.06 0.91 0.4 0.2B 0.04 0,3 1,49 0,42 1,5 -0.31 O.OB 0.3 -0.72 0.71 O.B 558 313,9. -0,27 0,77 0,5 600 313,9 -0.65 0,70 0,7 641 313,9 -0,43 0,59 0.5 682 313.8 -0.89 1.15 1.0 722 313.7 -0.26 0.10 0.3 762 313.6 -0.10 0.16 0.1 803 313,6 2,69 2.55 2,9 848 313,7 0,91 0,37 0,9 892 313,7 1,25 0,65 i.3 938 313.B -O.OB 2.87 1.4 985 313.7 0,75 0,04 O.B 1032 313.7 0.77 0,09 O.B 1078 313.6 -2.04 1.12 2.1 1125 313.6 1.11 0.76 1.2 1172 313.7 0.70 0.62 0.8 1218 313.7 -1.36 1.48 1.6 1264 313.7 0.68 0.62 0.8 1312 313.8 1.17 0.33 1.2 1360 313.B -0.75 0.08 0.8 1406 313.8 -1.55 1.24 1.7 1452 313.B 1.01 0.15 1.0 1500 313.B O.B5 0.14 0.9 1547 313.B -1.03 1.40 1.3 1594 313.9 0.86 0.49 0.9 1641 314.0 -0.78 1.69 1.2 1689 314.0 0,84 0,45 0,9 1742 314.1 0,52 0,45 0,6 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ;iSta. Num. 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86. 87 88 89 90 91 92 Incl. Azi. M.D. Angle Angle Feet Deg. Deg. 5388 31.41 316.95 5478 31.24 317.37 5572 30.99 316.59 5664 30.91 316.18 5757 30.65 316.17 5789 30.53 316.96 5BB1 29.93 315.72 5974 29.75 315.66 6066 29.66 315.64 6159 29.24 316.24 6251 28,81 316.44 6344 2B.BO 317.07 6437 28.50 317.51 6529 28.19 317.46 6621 28.22 318.05 6714 27.98 318,55 6806 27.75 319.10 6900 26.95 319.38 6993 26.49 319,54 7081 26.04 319.73 7175 26.03 316.45 7268 23.60 317,73 7361 22.16 315.02 7453 21.05 316.16 7582 19.69 317,56 7643 19.14 318.11 7736 18.56 316.88 7828 16.70 316.75 7920 14.80 316.57 8013 12.64 314.58 8106 lO.91 319.56 8169 10.74 321.80 8261 9.58 320.60 8354 7.92 319.97 8447 6.83 319.86 8540 5.33 316.73 8633 2.65 335.06 8726 1.88 16.01 8819 1.3g 355.67 8912 1.77 353.23 9410 2.25 350.00 9680 2.00 347.00 PROJE£TED 9738 2.00 347.00 WELLPATH DATA CCF1 Coordinates Vert. +N,-S +E,-W TVD Sec. Feet Feet Feet Feet 1245 -1281 4954 1501 1279 -1312 5031 1542 1315 -1346 5111 1584 1349 -1378 5190 1625 1383 -1411 5270 1665 1395 -1422 5298 1679 1429 -1455 5377 1719 1462 -1487 5458 1759 1494 -1519 5538 1798 1527 -i551 5619 i837 1559 -1581 5699 1875 i592 -i612 578i i914 i625 -i642 5862 1953 1657 -1672 5943 1991 1689 -1701 6024 2029 1722 -1730 6106 2067 1754 -1758 6188 2105 1787 -1787 6271 2143 1819 -1814 6354 2180 1848 -1839 6433 2215 1B7g -1867 6518 2251 1908 -1893 6602 2285 1934 -1918 '6688 2316 1958 -1942 6773 2345 1991 -1973 6894 2384 2006 -1986 6952 2401 2028 -2006 7040 2427 2048 -2026 7127 2451 2067 -2043 7216 2473 2082 -2058 7306 2492 2096 -2071 7397 2508 2105 -2079 7459 2519 2118 -2089 7550 2533 2129 -2098 7642 2546 2138 -2105 7734 2557 2145 -2112 7826 2565 2150 -2116 7919 2571 2154 -2116 8012 2575 2156 -2116 8105 2577 2159 -2116 8198 2580 2176 -2119 8696 2597 2186 -2121 8965 2607 2188 -2121 9023 2609 Closure Dist. Dire. Feet Deg. 1786 314.2 1833 314.3 1881 314.3 1929 314.4 1976 314.4 1992 314.4 2039 314.5 2085 314.5 2131 314.5 2176 314.6 2221 314.6 2266 314.6 2310 314.7 2354 314.7 2397 314.8 2441 314.9 2484 314.9 2527 315.0 2569 315.1 2607 315.1 2649 315.2 2688 315.2 2724 315.2 2758 315,2 2803 315.3 2823 315.3 2853 315.3 2881 315.3 2906 315.3 2928 315.3 2947 315.3 2958 315.4 2975 315.4 2989 315.4 3001 315.4 3010 315.4 3017 315.5 3O2O 315.5 3021 315.5 3023 315.6 3037 315.B 3046 315.9 3047 315.9 Rate Change Total Incl. Azi. D.L. TFO Deg/lOO Ft Deg/lO0 Ft Deg. -0.05 0.22 0.1 0 -0.19 0.47 0.3 0 -0.27 0.83 0.5 314 -0.09 0.45 D.3 314 -0.28 0.01 0.3 314 -0.37 0.59 0.5 314 -0.65 0.70 0.7 314 -0.19 0.06 0.2 315 -0.10 0.02 0.1 315 -0.45 0.65 0.6 315 -0.47 0.22 0.5 315 -0.01 0.68 0.3 315 -0.32 0.47 0.4 315 -0.34 0.05 0.3 315 0.03 0.64 0,3 315 -0,26 0.54 0.4 315 -0.25 0.60 0.4 315 -0.85 0.30 0.9 315 -0.49 0.17 0.5 315 -0.51 0.22 0.5 315 -0.01 3.49 1.5 315. -2.61 1.38 2.7 315 -1.55 2.91 1.9 315 -1.21 1.24 1.3 315 -1.05 1.09 1.1 315 -0.90 0.90 1.0 315 -0.62 1.32 O.B 315 -2.02 0.14 2.0 315 -2.07 0.20 2.1 315 -2.32 2.14 2.4 315 -1.86 5.35 2.2 315 -0.27 3.56 0.7 315 -1.26 1.30 1.3 315 -1.78 0.68 1.B 315 -1.17 0.12 1.2 315 -1.61 3.37 1.7 315 -2.88 19.71 3.2 315 -0.83 44.03 1.9 316 -0.53 21.87 0.8 316 0.41 2.62 0.4 316 0.10 0.65 0.1 316 -0.09 1.11 0.1 316 0.00 0.00 0.0 316 MARATHON OIL COMPANY DATE: FEBRUARY 27, 1996 05:00AM DEPTH: 327' Yesterday: Casing to Date: PREPARE TO SET CASING 'EPOCH WELL LOGGING MORNING REPORT. REPORT FOR: 24 Hour Progress: COREA CREEK FEDERAL # 1 LANCE LAMONS BIT INFORMATION: No. Size Type 1 17.50" GTX-1 Serial No. Jets Interval C86XK 20,20,20 0' 327' Footage Hours Condition 327' 9 NIA DRILLING PARAMETERS: High Low Rate of Penetration N/A at N/A at Surface Torque at at Weight on Bit at at Bit RPM at at Pump Pressure at at Average 73 ft./hr 400 psi 10-May Klbs 80-100 RPM 750 psi GAS SUMMARY: High Low Total Ditch Gas Out: ~ 0 ~ at 0 at Methane (C-1) 0 at 0 at Ethane (C-2) at at Propane (C-3) at at Butane (C-4) at at Pentane (C-5) at at Total Cuttings Gas: at at Background Gas: ~ units Wiper Gas: Connection Gas: N/A units average 0 units max. Trip Gas: N/A 0 Average 0 0 units @ N/A units @ 327' units ppm ppm ppm ppm ppm units HYDROCARBONS Other than gas) NONE LITHOLOGY: MOSTLY CLAY, SILTSTONE AND WOODY MATERIAL WITH SOME LIGNITE. Epoch Personnel on site: 4 Epoch Day Rate: 1620 MARATHON OIL COMPANY DATE: FEBRUARY 28, '1996 05:00AM DEPTH: 327' Yesterday: Casing to Date: 13 3/8" at 327' EPOCH WELL LOGGING MORNING REPORT 327' REPORT FOR: 24 Hour Progress: COREA CREEK FEDERAL # '1 LANCE LA~ONS BIT INFORMATION: No. Size Type 1 17.50" GTX-1 Serial No. Jets Interval C86XK 20,20,20 0' 327' Footage Hours Condition 327' 9 N/A DRILLING PARAMETERS: High Rate of Penetration N/A at Surface Torque at Weight on Bit at Bit RPM at Pump Pressure at N/A Low at at at at at Average ft./hr psi Klbs RPM psi GAS SUMMARY: High Total Ditch Gas Out: ~ N/A ~ at Methane (C-1) at Ethane (C-2) at Propane (C-3) at Butane (C-4) at Pentane (C-5) at Total Cuttings Gas: at Background Gas: ~ units Connection Gas: N/A units average 0 units max. N/A Low at at at at at at at Wiper Gas: Trip Gas: N/A units @ 327' N/A units @ 327' Average N/A units ppm ppm ppm ppm ppm units HYDROCARBONS Other than gas) NONE LITHOLOGY: NO DRILLING DURING THE LAST 24 HOURS. POOH. RIG UP AND RUN 13 3/8" CASING. CIRC. RIG UP DOWELL. PUMP CEMENT. RIG DOWN DOWELL. RIG UP DIVERTER LINE. Epoch Personnel on site: 4 Epoch Day Rate: 1620 MARATHON OIL COMPANY DATE: FEBRUARY 29, '!996 05:00AM DEPTH: 327' Casing to Date: 13 3/8" at 327' Yesterday: EPOCH WELL LOGGING MORNING REPORT REPORT FOR: 24 Hour Progress: COREA CREEK FEDERAL LANCE LAMONS BIT INFORMATION: No. Size Type 2 12.25" RBI C-05 VLRG Serial No. Jets Interval B J-680 15,15,15 327' Footage Hours Condition 0' 0' N/A DRILLING PARAMETERS: High Rate of Penetration N/A at Surface Torque at Weight on Bit at Bit RPM at Pump Pressure at N/A Low at at at at at Average N/A ff./hr psi Klbs RPM psi GAS SUMMARY: High Total Ditch Gas Out: ~ N/A J at Methane (C-1) at Ethane (C-2) at Propane (C-3) at Butane (C-4) at Pentane (C-5) at Total Cuttings Gas: at Background Gas: ~ units Connection Gas: N/A units average 0 units max. Low at at at at at at at Wiper Gas: Trip Gas: N/A units @ N/A 0 units @ 327' Average units ppm ppm ppm ppm ppm units HYDROCARBONS 'Other than gas) NONE LITHOLOGY: NO DRILLING DURING THE LAST 24 HIOURS. !Epoch Personnel on site: 4 Epoch Day Rate: 1620 MARATHON OIL COMPANY DATE: MARCH '1, '1996 05:00AM DEPTH: '1224' Yesterday: Casing to Date: 13 3/8" at 327' EPOCH WELL LOGGING MORNING REPORT 327' REPORT FOR: 24 Hour Progress: COREA CREEK FEDERAL # '1 LANCE LAMONS BIT INFORMATION: No. Size Type 2 12.25" RBI C-05 VLRG IDRILLING PARAMETERS: Serial No. Jets Interval B J-680 15,15,15 327' 1224' Footage Hours Condition 897' 0' IN HOLE High Low Average Rate of Penetration 450 at 1158' 29 at 1051' 185 ff./hr Surface Torque 127 at 1157' 12 at 1039' 80 psi Weight on Bit 13 at 1039' 0 at 1065' 7 Klbs Bit RPM 56 at 1068' 18 at 1039' 52 RPM Pump Pressure 1955 at 1392' 1392 at 1070' 1826 psi GAS SUMMARY: High Low Total Ditch Gas Out: ~ at 1156' 0 at 1062' Methane (C-1) 1000 at 1156' 0 at 1062' Ethane (C-2) at at Propane (C-3) at at Butane (C-4) at at Pentane (C-5) at at Total Cuttings Gas: at at Background Gas: ~ units WiperGas: Connection Gas: 0 units average 0 units max. Tdp Gas: N/A 0 units @ units @ 327' Average 1 200 units ppm ppm ppm ppm ppm units HYDROCARBONS Other than gas) NONE LITHOLOGY: MOSTLY SILTSTONE AND CLAY WITH COAL AND LIGNITE. TRACE AMOUNTS OF SAND. Epoch Personnel on site: 4 Epoch Day Rate: 1620 MARATHON OIL COMPANY DATE: MARCH 2, '1996 05:00AM DEPTH: 2'!22' Casing to Date: 13 3/8" at 327' 9 5/8" at 2563' Yesterday: '1224' EPOCH WELL LOGGING MORNING REPORT COREA CREEK FEDERAL REPORT FOR: L. LAMONS / D. BRIMBERRY 24 Hour Progres~ 898' ~ BIT INFORMATION: No. Size Type 2 12.25" RBI B J-680 Serial No. Jets C-05VLRG 15,15,15 Interval Footage Hours Condition 327' 0' 0 N/A DRILLING PARAMETERS: Rate of Penetration Surface Torque Weight on Bit Bit RPM Pump Pressure High 360 at 1886' 168 at 1801' 30 at 1377' 247 at 1604' 2624 at 1605' Low Average 0 at 2058' 139 0 at 2058' 69 0 at 2058' 13 0 at 2058' 121 0 at 2058' 1981 FT/HR FTLBS Klbs RPM PSI GAS SUMMARY: Total Ditch Gas Out: Methane (C-1) Ethane (C-2) Propane (C-3) Butane (C-4) Pentane (C-5) Total Cuttings Gas: Background Gas: ~ Connection Gas: 1 High Low ~ at 1886' 0 at 16436 at 1886' 0 at at at at at at at at at at at Average 2058' 21 2058' 4134 units Wiper Gas: 18 units @ 1501' units average 0 units max. Tdp Gas: 0 units @ 327' units ppm ppm ppm ppm ppm units HYDROCARBONS Other than gas) NONE LITHOLOGY: CHIEFLY FRIABLE SANDS THAT ARE GRAIN SUPPORTED AND COMPOSED MOSTLY OF QUARTZ. DARK VOLCANICS AND SOME CHERT. MINOR AMOUNTS OF FELDSPAR. APPROX 60%. ALSO LOGGED WERE MUDSTONES AND SILTSTONES. ABOUT 40%. I DAILY ACTIVITY: Epoch Personnel on site: 4 Epoch Day Rate: 1620 MARATHON OIL COMPANY DATE: MARCH 3, 1996 05:00AM DEPTH: 2584' Yesterday: Casing to Date: 13 3/8" at 327' EPOCH WELL LOGGING MORNING REPORT 2122' REPORT FOR: 24 Hour Progress: P. BERGA, L. LAMONS BIT INFORMATION: No. Size Type 2 12.25" RBI BJ-680 Serial No. Jets Interval C-05VLRG 15,15,15 327' Footage Hours Condition 0' 0 DRILLING PARAMETERS: Rate of Penetration Surface Torque Weight on Bit Bit RPM Pump Pressure High Low Average 190 at 2240 2 at 2134 55 ff./hr 186 at 2386 0 at 2566 93 psi 32 at 2506 4 at 2355 19 Klbs 264 at 2173 0 at 2568 134 RPM 2836 at 2250 1279 at 2215 2094 psi GAS SUMMARY: Total Ditch Gas Out: Methane (C-1) Ethane (C-2) Propane (C-3) Butane (C-4) Pentane (C-5) Total Cuttings Gas: Background Gas: Connection Gas: High Low ~ at 2582 6 at 2286 15200 at 2582 0 at 2585 at at at at at at at at 4 at 2440 1 at 2580 units Wiper Gas: units average 1 units max. Trip Gas: 0 Average 18 3484 units @ units @ 327' units ppm ppm ppm ppm ppm units HYDROCARBONS NONE LITHOLOGY: DOMINATELY SAND AND TUFFACEOUS CLAYSTONE WITH SOME TUFFACEOUS SILTSTNE. MINOR AMOUNTS OF CARBONACEOUS MATERIAL. FEW COAL BEDS. Epoch Personnel on site: 4 Epoch Day 'Rate: 1620 VIARATHON OIL COMPANY DATE: MARCH 4, t996 35:00AM DEPTH: 2584' Yesterday: Casing to Date: 13 3/8" at 327' EPOCH WELL LOGGING MORNING REPORT 2584.' REPORT FOR: 24 Hour Progress: COREA CREEK FEDERAL # 1 P. BERG/t, L. LAMONS BIT INFORMATION: No. Size Type 2 12.25" RBI BJ-680 Serial No. C-05VLRG Jets Interval 15,15,15 327' to 2584' Footage Hours Condition 2157' 35 DRILLING PARAMETERS: Rate of Penetration Surface Torque Weight on Bit Bit RPM Pump Pressure High at at at at at Low Average at 0 0 fi/hr at 0 0 psi at 0 0 Klbs at 0 0 RPM at 0 0 psi GAS SUMMARY: Total Ditch Gas Out: Methane (C-1) Ethane (C-2) Propane (C-3) Butane (C-4) Pentane (C-5) Total Cuttings Gas: Background Gas: ~ O ~ Connection Gas: High ~ at 2~000 at at at at at at units units average 2584' 2584' units max. Low at at at at at at at Wiper Gas: Trip Gas: Average 130 units @ 2584' units @ units ppm ppm ppm ppm ppm units HYDROCARBONS Other than gas) ILITHOLOGY: Epoch Personnel on site: 4 Epoch Day Rate: 1620 VIARATHON OIL COMPANY DATE: MARCH 5, 1996 05:00AM DEPTH: 2585' Casing to Date: 13 3/8" at 327' 9 5~8" at 2584' Yesterday: EPOCH WELL LOGGING MORNING REPORT 2585' REPORT FOR: 24 Hour Progress: COREA CREEK FEDERAL # 1 P. BERGA, L. LAMONS BIT INFORMATION: No. Size Type 2 12.25" RBI B J-680 Sedal No. C-05VLRG Jets Interval 15,15,15 327' to 2585' Footage Hours Condition 34.7 I-1 -W'I'-A- F 2258' 4-NO-TD DRILLING PARAMETERS: Rate of Penetration Surface Torque Weight on Bit Bit RPM Pump Pressure High Low Average 0 at 0 0 at 0 0 ft./hr 0 at 0 0 at 0 0 psi 0 at 0 0 at 0 0 Klbs 0 at 0 0 at 0 0 RPM 0 at 0 0 at 0 0 psi GAS SUMMARY: Total Ditch Gas Out: Methane (C-1) Ethane (C-2) Propane (C-3) Butane (C-4) Pentane (C-5) Total Cuttings Gas: Background Gas: Connection Gas: High Low at N/A 1 at N/A at at at at at at at at at at at at units Wiper Gas: units @ units average units max. Trip Gas: MISSED units @ Average 1 units ppm ppm ppm ppm ppm units HYDROCARBONS Other than gas) LITHOLOGY: RUN E.LOGS, ClR AND REDUCE MW, RUN 9 5/8" CSG CALIBRATED GAS DETECTOR AND CHROMATOGRAPH WITH INTEGRATOR. PERFORMED ROUTINE UNIT INSPECTIONS AND CALIBRATIONS. REPLACE AIR DRIVEN TRAP MOTOR (BENT SHAFT) WHILE C.B.U NO TRIP GAS DETECTED DUE TO TRAP REPAIRS, GAS TRAP WAS ON LINE AT APPROX. TIME FOR TRIP GAS, ClR GAS WAS 1-2 UNITS PROBABLY DUE TO HIGH MUD WEIGHTS. Epoch personnel on site: 4 EPoch'Day"Rate: "1't~20 MARATHON OIL COMPANY DATE: MARCH 6, '1996 05:00AM DEPTH: 2585' Casing to Date: 13 3/8" at 327' 9 5/8" at 2563' Yesterday: EPOCH WELL LOGGING MORNING REPORT 2585' REPORT FOR: 24 Hour Progress: COREA CREEK FEDERAL # '1 PETE BERGA BIT INFORMATION: No. Size Type 2 12.25" RBI B J-680 Serial No. C-05VLRG Jets Interval 15,15,15 327' to 2585' Footage Hours Condition 34.7 I-1-WT-A-F 2258' 4-NO-TD DRILLING PARAMETERS: Rate of Penetration Surface Torque Weight on Bit Bit RPM Pump Pressure High Low Average 0 at 0 0 at 0 0 ff./hr 0 at 0 0 at 0 0 psi 0 at 0 0 at 0 0 Klbs 0 at 0 0 at 0 0 RPM 0 at 0 0 at 0 0 psi GAS SUMMARY: Total Ditch Gas Out: Methane (C-1) Ethane (C-2) Propane (C-3) Butane (C-4) Pentane (C-5) Total Cuttings Gas: High Low ~ 5 ~ at N/A 1 at N/A 1000 at N/A 200 at N/A at at at at at at at at N/A at N/A at Background Gas: ~ units Wiper Gas: units @ Connection Gas: units average units max. Trip Gas: units @ Average 1 200 units ppm ppm ppm ppm ppm units HYDROCARBONS Other than gas) LITHOLOGY: BEGIN RUNNING 9 5/8" CASING. FINISH RUNNING CASING. RIG UP DOWELL. MIX AND PUMP CEMENT. DISPLACE WITH 45 bbls OF MUD. PUMP SPACER AND CEMENT TO AUGER. OPEN ANNULAR VALVE AND DRAIN TO CELLAR. FLUSH WITH WATER. RIG DOWN DOWELL. PULL OUT OF THE HOLE. HIGH GAS READING WAS 5 UNITS. LOW WAS '1 UNIT. AVERAGE WAS '1 UNIT. CASING SHOE IS AT 2563'. Epoch Personnel on site: 4 Epoch Day Rate: 1620 MARATHON OIL COMPANY DATE: MARCH 7,1996 05:00AM DEPTH: 2585' Casing to Date: 13 3/8" at 327' 9 5/8" at 2563' Yesterday: EPOCH WELL LOGGING MORNING REPORT 2585" REPORT FOR: 24 Hour Progress: COREA CREEK FEDERAL # 1 LANCE LAMONS BIT INFORMATION: No. Size Type 2 12.25" RBI B J-680 Serial No. C-05VLRG Jets Interval 15,15,15 327' to 2585' Footage Hours Condition 34.7 I-1-WT-A-F 2258' 4-NO-TD DRILLING PARAMETERS: Rate of Penetration Surface Torque Weight on Bit Bit RPM Pump Pressure High Low Average 0 at 0 0 at 0 0 tr./hr 0 at 0 0 at 0 0 psi 0 at 0 0 at 0 0 Klbs 0 at 0 0 at 0 0 RPM 0 at 0 0 at 0 0 psi GAS SUMMARY: Total Ditch Gas Out: Methane (C-1) Ethane (C-2) Propane (C-3) Butane (C-4) Pentane (C-5) Total Cuttings Gas: High Low L_____J at at at at at at at at at at at at at at Background Gas: L______J units Wiper Gas: units @ Connection Gas: units average units max. Trip Gas: units @ Average units ppm ppm ppm ppm ppm units HYDROCARBONS Other than gas) LITHOLOGY: Rig down diverter system and install stack and casing spool. Test to 2700 psi. Nipple up BOPE, install flow line to mud pits and trip tank. Continue to nipple up BOPE. Epoch Personnel on site: 4 Epoch Day Rate: 1620 MARATHON OIL COMPANY DATE: .~O~RCH 6, i996 05:00AM DEPTH: 2585' Casing to Date: 13 3/8" at 327' 9 5/8" at 2563' Yesterday: EPOCH WELL LOGGING MORNING REPORT 2585" REPORT FOR: 24 Hour Progress: COREA CREEK FEDERAL # 1 LANCE LAMONS BIT INFORMATION: No. Size Type 4 8.5" RBI C-05 Sedal No. Jets Interval 12,12,12 2585' Footage Hours Condition DRILLING PARAMETERS: Rate of Penetration Surface Torque Weight on Bit Bit RPM Pump Pressure High Low Average 0 at 0 0 at 0 0 it ./hr 0 at 0 0 at 0 0 psi 0 at 0 0 at 0 0 Klbs 0 at 0 0 at 0 0 RPM 0 at 0 0 at 0 0 psi GAS ._-3 iJ ,.-,.'., ,.'~ A R Y: Total Ditch Gas Out: Methane (C-1) Ethane (C-2) Propane (C-3) Butane (C-4) Pentane (C-5) Total Cuttings Gas: High Low at at at at at at at at at at at at at at Background Gas: ~ units Wiper Gas: units @ Connection Gas: units average units max. ""~,, ,~, ..... ..,~,~. units @ Average units ppm ppm ppm ppm ppm units HYDROCARBONS Other than gas) LITHOLOGY' FINISH THE NIPPLE UP OF THE BLOW OUT PREVENTION EQUIPMENT. MAKE UP BI-IA AND TEST MWD SURVEY TOOLS. CONTINUE TO RUN IN THE HOLE. MAKE READY TO DRILL OUT CEMENT. Epoch Personnel on site: 4 Epoch Day Rate: 1620 MARATHON OIL COMPANY DATE: MARCH 9, '1996 05:00AM DEPTH: 28'18' Casing to Date: 13 3/8" at 327' 9 5/8" at 2563' Yesterday: 2585' EPOCH WELL LOGGING MORNING REPORT REPORT FOR: 24 Hour Progress: COREA CREEK FEDERAL # '1 LANCE LAMONS BIT INFORMATION: No. Size Type 4 8.5" RBI C05 RVLRG Sedal No. Jets Interval Footage Hours Condition BK-493 12,12,12 2585' DRILLING PARAMETERS: Rate of Penetration Surface Torque Weight on Bit Bit RPM Pump Pressure High Low Average 300 at 2658 5 at 2633 90 ff./hr 154 at 2585 15 at 2703 34 psi 33 at 2783 8 at 2586 25 Klbs 249 at 2585 76 at 2586 96 RPM 2219 at 2609 1253 at 2588 2013 psi GAS SUMMARY: Total Ditch Gas Out: Methane (C-1) Ethane (C-2) Propane (C-3) Butane (C-4) Pentane (C-5) Total Cuttings Gas: Background Gas: Connection Gas: High Low Average ~ at 2585 1 at 2812 2 units 7700 at 2585 200 at 2812 472 ppm at at ppm at at ppm at at ppm at at ppm at at units units Wiper Gas: N/A units @ units average 0 units max. Trip Gas: 0 units @ 2585 HYDROCARBONS 'Other than gas) :LITHOLOGY: THE CHIEF LITHOLOGIES ARE TUFFACEOUS CLAYSTONE, SAND, CONGLOMERATE, AND COAL. THE TUFFACEOUS CLAYSTONE IS LOGGED THROUGHOUT THE SECTION. THE CONGLOMERATE IS LOGGED BETWEEN 2620' AND ABOUT 2657'. THE SAND IS LOGGED ABOVE AND BELOW THE CONGLOMERATE AND INTERMI'I-I'ENTLY BETWEEN 2585' AND 2818'. COAL IS LOGGED INTERMITTENTLY IN THIS SECTION AND GENERALLY CORRELATES TO FAST DRILL RATES. THERE IS A MINOR AMOUNT OF TUFF LOGGED BETWEEN 2585' AND 2600'. Epoch Pe'r's'ol~'nJi on site: ',4 ........ Epoch Day Rate: 1620 MARATHON OIL COMPANY DATE: MARCH 10, 1996 05:00AM DEPTH: 3073' Casing to Date: 13 3/8" at 327' 9 5/8" at 2563' Yesterday: 28'18' EPOCH WELL LOGGING MORNING REPORT REPORT FOR: 24 Hour Progress: COREA CREEK FEDERAL LANCE LAMONS BIT INFORMATION: No. Size Type 4 8.5" RBI C05 RVLRG Sedal No. Jets Interval BK-493 12,12,12 2585' Footage Hours Condition DRILLING PARAMETERS: Rato of Ponotration Surface Torque Weight on Bit Bit RPM Pump Pressure High Low Average 360 at 296g 21 at 2949 130 ~.~'lr 47 at 2896 7 at 2849 41 psi 47 at 3031 22 at 2820 40 Klbs 91 at 2979 19 at 2849 82 RPM 2388 at 2903 1161 at 2900 1959 psi GAS SUMMARY: Total Ditch Gas Out: Methane (C-1) Ethane (C-2) Propane (C-3) Butane (C-4) Pentane (C-5) Total Cuttings Gas: Background Gas: Connection Gas: High Low ~ at 2873 1 at 3060 882 at 2873 97 at 3037 at at at at at at at at at at units Wiper Gas: units average 0 units max. Trip Gas: N/A 0 Average 2 416 units @ units @ 2818' units ppm ppm ppm ppm ppm units HYDROCARBONS Other than gas) LITHOLOGY: CHIEF LITHOLOGIES ARE TUFFACEOUS CLAYSTONE, SAND, AND COAL. TUFFACEOUS CLAYSTONE IS LOGGED THROUGHOUT THE DRILLED SECTION FROM 2818' TO 3070'. THERE MINOR AMOUNTS OF COAL ~,ND THIN SAND STRINGERS AT ABOUT 3000' Epoch Personnel on site: 4 Epoch Day Rate: 1620 EPOCH WELL LOGGING MARATHON OIL COMPANY DATE: MARCH '1'1, '1996 05:00AM DEPTH: 35~16' Casing to Date: 13 3/8" at 327' 9 5~8" at 2563' Yesterday: 3073' MORNING REPORT REPORT FOR: 24 Hour Progress: COREA CREEK FEDERAL LANCE LAMONS BIT INFORMATION: No. Size Type 5 8.5" RBI C-1 VLRGR Serial No. Jets Interval BJ-607 13,13,13 3342' Footage Hours Condition DRILLING PARAMETERS: Rate of Penetration Surface Torque Weight on Bit Bit RPM Pump Pressure High Low Average 327 at 30082' 10 at 3388' 106 ff./hr 48 at 3082' 0 at 3389' 31 psi 51 at 3082' 0 at 3471' 19 Klbs 204 at 3412' 21 at 3312' 119 RPM 2726 at 3421' 1000 at 3358' 1884 psi GAS SUMMARY: Total Ditch Gas Out: Methane (C-1) Ethane (C-2) Propane (C-3) Butane (C-4) Pentane (C-5) Total Cuttings Gas: Background Gas: Connection Gas: High Low ~ at 3171' 1 at 3091 1110 at 3171' 100 at 3091' at at at at at at at at at at units Wiper Gas: N/A units average 0 units max. Trip Gas: 2 Average 3 508 units @ units @ 3342' units ppm ppm ppm ppm ppm units iHYDROCARBONS !(Other than gas) NONE. LITHOLOGY: NOTE: 23 UNITS OF GAS ONE STAND OFF BO'Fi'OM WHEN PUMPING OUT OF THE HOLE. MOSTLY TUFFACEOUS CLAYSTONE,AND SAND/CONGLOMERATIC SAND WITH SOME COAL AND CARBONACEOUS MATERIAL. MINOR AMOUNTS OF TUFF. Epoch Personnel on site: 4 Epoch Day Rate: 1 620 EPOCH WELL LOGGING MARATHON OIL COMPANY DATE: MARCH t2, t996 05:00AM DEPTH: 4411' Casing to Date: 13 318" at 327' 9 5/8" at 2563' Yesterday: 3516' MORNING REPORT REPORT FOR: 24 Hour Progress: COREA CREEK FEDERAL # 1 LANCE LAMONS BIT INFORMATION: No. Size Type 5 8.5" RBI C-1 VLRGR Serial No. Jets Interval Footage Hours Condition BJ-607 13,13,13 3342' DRILLING PARAMETERS: Rate of Penetration Surface Torque Weight on Bit Bit RPM Pump Pressure High Low Average 327 at 3798' 12 at 3669' 94 ff./hr 39 at 4208' 0 at 4244' 28 psi 33 at 4195' 1 at 3579' 19 Klbs 264 at 3970' 116 at 4227' 186 RPM 2435 at 3578' 1233 at 4073' 2063 psi GAS SUMMARY: Total Ditch Gas Out: Methane (C-1) Ethane (C-2) Propane (C-3) Butane (C-4) Pentane (C-5) Total Cuttings Gas: Background Gas: ~ 5 ~ Connection Gas: 0 High Low Average ~ at 4181' 1 at 3956' 5 units 6190 at 4181' 197 at 3580' 887 ppm at at ppm at at ppm at at ppm at at ppm at at units units Wiper Gas: 7 units @ 3855' units average 0 units max. Tdp Gas: N/A units @ HYDROCARBONS Other than gas) NONE. LITHOLOGY: THE SECTION DRILLED IS FROM 3515' TO 4411'. TUFFACEOUS CLAYSTONE IS LOGGED THROUGHOUT THE SECTION IN THE SECTION COAL AND CARBONACEOU MATERIAL ARE LOGGED INTERMITTENTLY. CONGLOMERATIC SAND AND SAND ARE LOGGED AT VARIOUS DEPTHS. THERE IS TUFFACEOUS SILTSTONE, TUFF, AND MUDSTONE IN THE SECTION. THE LITHOLOGIES ARE DESCRIBED ON THE MUD LOG. Epoch Personnel on site: 4 Epoch Day Rate: 1620 MARATHON OIL COMPANY DATE: MARCH 13, 1996 05:00AM DEPTH: 5162' Casing to Date: 13 3/8' at 327' 9 5/8" at 2563' Yesterday: 4411' EPOCH WELL LOGGING MORNING REPORT REPORT FOR: 24 Hour Progress: COREA CREEK FEDERAL # 1 L. LAMONS / D. BRIMBERRY BIT INFORMATION: No. Size Type 5 8.5" RBI C-1 VLRGR Serial No. Jets Interval B J-607 13,13,13 3342' Footage Hours Condition DRILLING PARAMETERS: Rate of Penetration Surface Torque Weight on Bit Bit RPM Pump Pressure High Low Average 240 at 4654' 8 at 4428' 71 ft./hr 40 at 4551' 0 at 5077' 29 psi 40 at 4886' 4 at 4428' 25 Klbs 206 at 4467' 123 at 4876' 179 RPM 2525 at 5066' 1088 at 4825' 1943 psi GAS SUMMARY: Total Ditch Gas Out: Methane (C-1) Ethane (C-2) Propane (C-3) Butane (C-4) Pentane (C-5) Total Cuttings Gas: Background Gas: Connection Gas: High Low ~ at 5134' 2 at 474O' 6395 at 5134' 300 at 4740' at at at at at at at at at at units Wiper Gas: 15 units @ units average 0 units max. Trip Gas: N/A units @ Average 6 1174 4967' units ppm ppm ppm ppm ppm units HYDROCARBONS Other than gas) NONE. LITHOLOGY: MOSTLY TUFFACEOUS CLAYSTONE WITH SOME TUFFACEOUS SILTSTONE. THERE ARE COALS AND SOME CARBONACEOUS MATERIAL. OTHER LITHOLOGIES THAT ARE LOGGED ARE MUDSTONE SAND AND SHALE. Epoch Personnel on site: 4 Epoch Day Rate: 1620 MARATHON OIL COMPANY iDATE: MARCH '14, '1996 05:00AM DEPTH: 5349' Yesterday: Casing to Date: 13 3/8" at 327' 9 5/8" at 2563' EPOCH WELL LOGGING MORNING REPORT 5'162' REPORT FOR: 24 Hour Progress: COREA CREEK FEDERAL # 1 P. BERGA / D. BRIMBERRY BIT INFORMATION: No. Size Type 6 8.5" RBI Cl- VLRG Serial No. Jets Interval BJ-633 13,13,13 5247' Footage Hours Condition DRILLING PARAMETERS: 'Rate of Penetration Surface Torque 'Weight on Bit :Bit RPM 'Pump Pressure 113 38 33 228 2312 High Low Average at 5162' 10 at 5156' 49 tr./hr at 5236' 30 at 5156' 35 psi at 5206' 16 at 5136' 27 Klbs at 5282' 95 at 5294' 181 RPM at 5262' 700 at 5254' 1972 psi GAS SUMMARY: Total Ditch Gas Out: Methane (C-1) Ethane (C-2) Propane (C-3) Butane (C-4) Pentane (C-5) Total Cuttings Gas: Background Gas: ~ 5 ~ Connection Gas: 0 7700 High at at at at 5144' 2 5144' 300 Low at 5285' at 5285' at at at at at units Wiper Gas: N/A units average 0 units max. Tdp Gas: 6 Average 8 1683 units @ units @ 5247' units ppm ppm ppm ppm ppm units HYDROCARBONS Other than gas) NONE. LITHOLOGY: SHALE AND TUFFACEOUS CLAYSTONE ARE LOGGED THROUGHOUT THIS SECTION. SAND IS LOGGED INTERMI'I-FENTLY IN SECTION FROM 5130' TO 5310'. COAL IS ANOTHER LITHOLOGY AS WELL AS MUDSTONE. EPOCH WELL LOGGING MARATHON OIL COMPANY DATE: MARCH t5, 1996 05:00AM DEPTH: 5825' Casing to Date: 13 3/8" at 327' 9 518" at 2563' Yesterday: 5349' MORNING REPORT REPORT FOR: 24 Hour Progress: COREA CREEK FEDERAL # 1 P. BERGA / D. BRIMBERRY BIT INFORMATION: No. Size Type 6 8.5" RBIC1- VLRG Serial No. Jets Interval Footage Hours Condition BJ-633 13,13,13 5247'- 578' 23 5825' DRILLING PARAMETERS: Rate of Penetration Surface Torque Weight on Bit Bit RPM Pump Pressure High Low Avemge 240 at 5575' 7 ~ 5397' 43 ff./hr 46 at 5650' 31 at 5425' 36 psi 42 at 5657' 23 at 5356' 37 Mbs 141 at 5812' 100 at 5389' 130 RPM 3209 at 5756' 1423 at 5641' 2974 psi GAS SUMMARY: Total Ditch Gas Out: Methane (C-1) Ethane (C-2) Propane (C-3) Butane (C-4) Pentane (C-5) Total Cuttings Gas: Background Gas: iConnection Gas: High Low Average ] 35 ~ at 5508' 1 at 5387' 7 units 12893 at 5589' 200 at 5387~ 1933 ppm at at ppm at at ppm at at ppm at at ppm 4 at 5569' 1 at 5823' 2 units units Wiper Gas: 2 units @ 5825' units average 0 units max. Trip Gas: N/A units @ HYDROCARBONS (Other than gas) NONE. LITHOLOGY: THE LITHOLOGIES LOGGED IN THIS SECTION ARE: TUFFACEOUS CLAYSTONE, SAND, COAL, AND MUDSTONE. Epoch Personnel on site: 4 Epoch Day Rate: 1620 MARATHON OIL COMPANY DATE: MARCH 16, 1996 05:00AM DEPTH: 5861' Casing to Date: 13 3/8" at 327' 9 5/8" at 2563' Yesterday: 5825' EPOCH WELL LOGGING MORNING REPORT REPORT FOR: 24 Hour Progress: COREA CREEK FEDERAL # 1 P. BERGA / D. BRIMBERRY BIT INFORMATION: No. Size Type 6 8.5" RBI C1- VLRG Sedal No. Jets Interval BJ-633 13,13,13 5247'- 5825' Footage Hours Condition 579' 18.3 DRILLING PARAMETERS: Rate of Penetration Surface Torque Weight on Bit Bit RPM Pump Pressure High Low Avenge 20 at 5825' 1 at 5826' 3 ~.~r 47 at 5854' 36 at 5825' 45 psi 41 at 5825' 4 at 5827' 14 Klbs 140 at 5825' 60 at 5827' 72 RPM 3139 at 5825' 687 at 5837' 812 psi GAS SUMMARY: Total Ditch Gas Out: Methane (C-1) Ethane (C-2) Propane (C-3) Butane (C-4) Pentane (C-5) Total Cuttings Gas: Background Gas: Connection Gas: High Low ~ at 5826' 1 at 5853' 548 at 5856' 200 at 5853' at at at at at at at at 2 at 5830' 1 at 5830' units Wiper Gas: 0 units average 0 units max. Tdp Gas: Average 2 326 1 units @ 5825' units @ 5825' units ppm ppm ppm ppm ppm units HYDROCARBONS Other than gas) NONE LITHOLOGY: TUFFACEOUS CLAYSTONE, COAL, AND SOME LOOSE SAND GRAINS. CUTTING CORE #1 FROM 5825' TO 5860' Epoch Personnel on site: 4 Epoch Day Rate: 1620 MARATHON OIL COMPANY DATE: MARCH '17, 1996 05:00AM DEPTH: 6'104' Casing to Date: 13 3/8" at 327' 9 5/8" at 2563' Yesterday: 5864' EPOCH WELL LOGGING MORNING REPORT REPORT FOR: 24 Hour Progress: COREA CREEK FEDERAL # '1 P. BERGA / D. BRIMBERRY BIT INFORMATION: No. Size Type 6 8.5" RBI Cl- VLRG CB#1 8.5" SC-712 Serial No. Jets Interval Footage Hours Condition BJ-633 13,13,13 5247'- 579' 18.3 I-1-WT-A-E 5825' I-NO-CP 117740 CORE 5825' 48' 16.5 DRILLING PARAMETERS: Rate of Penetration Surface Torque Weight on Bit Bit RPM Pump Pressure High Low Average 139 at 6043' 1 at 5877' 43 ft./hr 65 at 6045' 21 at 6066' 44 psi 41 at 6060' 17 at 5865' 35 Klbs 142 at 6004' 50 at 6066' 112 RPM 2765 at 6073' 569 at 5858' 2405 psi GAS SUMMARY: ,Total Ditch Gas Out: 'Methane (0-1) Ethane (C-2) Propane (C-3) Butane (C-4) Pentane (C-5) Total Cuttings Gas: Background Gas: L_Z.__J Connection Gas: 0 High Low Average ~ at 6046' 1 at 5885' 8 units 17500 at 6046' 92 at 5914' 1416 ppm at at ppm at at ppm at at ppm at at ppm 4 at 6000' 1 at 5885' 2 units units Wiper Gas: N/A units @ units average 0 units max. Tdp Gas: 6 units @ 5885' HYDROCARBONS Other than gas) NONE LITHOLOGY: MOSTLY TUFFACEOUS CLAYSTONE AND TUFFACEOUS SILTSTONE. SOME COALS WERE LOGGED INTERMITENTLY IN THIS SECTION. FINE TO MEDIUM GRAIN SAND WAS ALSO LOGGED IN THIS SECTION. BOTH SAND AND COALS ARE GENERALLY ASSOCIATED WITH HIGHER RATES OF PENETRATION. Epoch Personnel on site: 4 Epoch Day Rate: 1620 EPOCH WELL LOGGING MARATHON OIL COMPANY DATE: MARCH 18, 1996 05:00AM DEPTH: 6626' Casing to Date: 13 3/8" at 327' 9 5/8" at 2563' Yesterday: 6104' MORNING REPORT REPORT FOR: 24 Hour Progress: COREA CREEK FEDERAL # 1 P. BERGA / D. BRIMBERRY BIT INFORMATION: No. Size Type 6 8.5" RBI Cl- VLRG CB#1 8.5" SC-712 Serial No. Jets Inte~al BJ-633 13,13,13 5247'- 5825' 117740 CORE 5825' Footage Hours Condition 579' 18.3 I-1-WT-A-E I-NO-CP 48' 16.5 DRILLING PARAMETERS: Rate of Penetration Surface Torque Weight on Bit Bit RPM Pump Pressure High Low Average 277 at 6237' 9 at 6103' 40 ff./hr 77 at 6549' 37 at 6103' 63 psi 44 at 6569' 18 at 6103' 39 Klbs 142 at 6129' 64 at 6103' 128 RPM 3039 at 6237' 1610 at 6257' 2775 psi GAS SUMMARY: Total Ditch Gas Out: Methane (C-1) Ethane (0-2) Propane (C-3) Butane (C-4) Pentane (C-5) Total Cuttings Gas: Background Gas: 8L.__L_j Connection Gas: NO CG'S High Low ~ at 6491' 3 at 6181' 18542 at 6491' 156 at 6363' at at at at at at at at 5 at 6239' 1 at 6181' units Wiper Gas: 75 units @ units average 0 units max. Trip Gas: N/A units @ Average 10 1685 2 6467' units ppm ppm ppm ppm ppm units HYDROCARBONS Other than gas) NONE LITHOLOGY: SAND AND SANDSTONE ARE LOGGED IN THIS SECTION AS ARE TUFFACEOUS CLAYSTON AND TUFFACEOUS SILTSTONES. ALSO LOGGED ARE COALS. Epoch Personnel on site: 4 Epoch Day Rate: 1620 MARATHON OIL COMPANY DATE: MARCH t9, t996 05:00AM DEPTH: 7055' Casing to Date: 13 3/8" at 327' 9 5/8" at 2563' Yesterday: 6626' EPOCH WELL LOGGING MORNING REPORT REPORT FOR: 24 Hour Progress: COREA CREEK FEDERAL P. BERGA / D. BRIMBERRY BIT INFORMATION: No. Size Type 8 8.5" RBI Cl- VLRG SefialNo. J~s Inte~al BJ-633 13,13,13 5885'- 7055' Footage Hours Condition 1170' 40 DRILLING PARAMETERS: Rate of Penetration Surface Torque Weight on Bit Bit RPM iPump Pressure High Low Average 190 at 6779' 13 at 6771' 37 ff./hr 83 at 7015' 63 at 6872' 73 psi 49 at 7008' 25 at 6742' 43 Klbs 142 at 6683' 101 at 6763' 135 RPM 3118 at 6732' 1716 at 6963' 2750 psi GAS SUMMARY: Total Ditch Gas Out: Methane (C-1) Ethane (C-2) Propane (C-3) Butane (C-4) Pentane (C-5) Total Cuttings Gas: Background Gas: ~ Connection Gas: NO CG'S High Low L 58 ] at 6862' 2 at 6843 11600 at 6862' 400 at 6843' at at at at at at at at 6 at 6750' 2 at 6840' units Wiper Gas: 8 units @ units average 0 units max. Trip Gas: N/A units @ Average 5 998 2 6838' units ppm ppm ppm ppm ppm units HYDROCARBONS Other than gas) NONE LITHOLOGY: TUFFACEOUS CLAYSTONE AND TUFFACEOUS SILTSTONE ARE LOGGED IN THIS SECTION. THERE ARE SHALE AND COAL LOGGED AS WELL AS MINOR MUDSTONES. Epoch Personnel on site: 4 Epoch Day Rate: 1620 EPOCH WELL LOGGING MARATHON OIL COMPANY DATE: MARCH 20, '1996 05:00AM DEPTH: 732'1' Casing to Date: 13 3/8" at 327' 9 5~8" at 2563' Yesterday: 7055' MORNING REPORT REPORT FOR: 24 Hour Progress: COREA CREEK FEDERAL # 1 P. BERGA / D. BRIMBERRY BIT INFORMATION: No. Size Type 8 8.5" RBI Cl- VLRG Serial No. Jets Interval B J-609 13,13,13 7055' Footage Hours Condition DRILLING PARAMETERS: Rate of Penetration Surface Torque Weight on Bit Bit RPM Pump Pressure High Low Average 139 at 7244' 14 at 7087' 49 tr./hr 78 at 7057' 0 at 7252' 53 psi 57 at 7148' 19 at 7135' 34 Klbs 273 at 7055' 123 at 7133' 177 RPM 3149 at 7249' 1954 at 7067' 2666 psi GAS SUMMARY: Total Ditch Gas Out: Methane (C-1) Ethane (C-2) Propane (C-3) 'Butane (C-4) Pentane (C-5) Total Cuttings Gas: Background Gas: ~ 6 ~ Connection Gas: NO CG'S High Low ~ at 7130' 2 at 7259' 4500 at 7130' 399 at 7259' at at at at at at at at 4 at 7169' 1 at 7260' units Wiper Gas: N/A units @ units average 0 units max. Trip Gas: 12 units @ Average 7 units 1385 ppm ppm ppm ppm ppm 2 units 7055' HYDROCARBONS Other than gas) NONE LITHOLOGY: MOSTLY TUFFACEOUS CLAYSTONE AND TUFFACEOUS SILTSTONE WERE LOGGEED IN THIS SECTION ALONG WITH SAND AND SANDSTONE. THERE WAS ALSO SHALE AND MINOR AMOUNTS OF MUDSTONE AND SILTSTONE LOGGED. COAL WAS ALSO LOGGED. Epoch Personnel on site: 4 Epoch Day Rate: 1620 MARATHON OIL COMPANY DATE: MARCH 2'1, 1996 05:00AM DEPTH: 75'18' Casing to Date: 13 3/8" at 327' 9 5/8" at 2563' Yesterday: 7321' EPOCH WELL LOGGING MORNING REPORT REPORT FOR: 24 Hour Progress: COREA CREEK FEDERAL # 1 P. BERGA / D. BRIMBERRY BIT INFORMATION: No. Size Type 8 8.5" RBI Cl- VLRG DRILLING PARAMETERS: Serial No. Jets Interval B J-609 13,13,13 7055'- 7518' Footage Hours Condition 463' 18 High Low Average Rate of Penetration Surface Torque Weight on Bit Bit 'RPM Pump Pressure 212 at 7346' 3 at 7508' 33 l~./hr 432 at 7352' 0 at 7506' 154 psi 59 at 7319' 18 at 7293' 39 Klbs 203 at 7506' 131 at 7318' 190 RPM 3063 at 7507' 2198 at 7294' 2614 psi GAS SUMMARY: Total Ditch Gas Out: Methane (C-1) Ethane (C-2) Propane (C-3) Butane (C-4) Pentane (C-5) Total Cuttings Gas: Background Gas: J 3 ~ Connection Gas: NO CG'S HYDROCARBONS High Low ~ at 7400' 1 at 7447' 4500 at 7400' 200 at 7447' at at at at at at at at 4 at 7469' 1 at 7415 units Wiper Gas: 15 units @ units average 0 units max. Trip Gas: units @ Average 4 871 3 7518' units ppm ppm ppm ppm ppm units Other than gas) NO OIL INDICATORS LITHOLOGY: SAND AND SANDSTONE ALONG WITH TUFFACEOUS CLAYSTONE AND TUFFACEOUS SILTSTONE ARE THE PREVAILING LITHOLOGIES IN THIS SECTION. ALSO LOGGED ARE SHALE AND COAL. Epoch Personnel on site: 4 Epoch Day Rate: 1620 MARATHON OIL COMPANY DATE: MARCH 22, 1996 05:00AM DEPTH: 7521' Casing to Date: 13 3/8" at 327' 9 5/8" at 2563' Yesterday: 7518' EPOCH WELL LOGGING MORNING REPORT REPORT FOR: 24 Hour Progress: COREA CREEK FEDERAL # 1 L. LAMONS / D. BRIMBERRY BIT INFORMATION: No. Size Type Serial No. Jets Interval 8 8.5" RBI C-1 B J-609 13,13,13 7055'- VLRG 7518' Footage Hours Condition 463' 16.7 8-8-LC-A F-2-LC-P DRILLING PARAMETERS: High Low Rate of Penetration MILL ON JUNK at at Surface Torque at at Weight on Bit at at Bit RPM at at Pump Pressure at at Average ff./hr psi Klbs RPM psi GAS SUMMARY: High Low Total Ditch Gas Out: ~ at 7518' 2 at 7518' Methane (C-1) 2800 at 7518' 400 at 7518' Ethane (C-2) at at Propane (C-3) at at Butane (C-4) at at Pentane (C-5) at at Total Cuttings Gas: at at Background Gas: ~ 2 ~ units Wiper Gas: Connection Gas: units average units max. Trip Gas: 14 Average 4 N/A units @ units @ 7518' units ppm ppm ppm ppm ppm units HYDROCARBONS Other than gas) LITHOLOGY: FROM 7518' TO 7521' IS TUFFACEOUS CLAYSTONE. TEST BOPE, CHOKE, KELLY, KILL VALVES, STAND PIPE, SAFETY VALVES, AND HYDRILL. RIH. MILL ON CONES. CIRCULATE. POOH. NO CONES IN JUNK BASKET. Epoch Personnel on site: 4 Epoch Day Rate: 1620 EPOCH WELL LOGGING MARATHON OIL COMPANY DATE: MARCH 23, '1996 05:00AM DEPTH: 7532' Casing to Date: 13 3/8" at 327' 9 5/8" at 2563' Yesterday: 7521' MORNING REPORT REPORT FOR: 24 Hour Progress: COREA CREEK FEDERAL L. LAMONS 1 D. BRIMBERRY BIT INFORMATION: No. Size Type 8 8.5" RBI C-1 VLRG Serial No. Jets Interval B J-609 13,13,13 7055'- 7518' Footage Hours Condition 463' 16.7 8-8-LC-A F-2-LC-P DRILLING PARAMETERS: Rate of Penetration Surface Torque Weight on Bit Bit RPM Pump Pressure High Low Average 9 at 7517' 1 at 7527' 3 fi./hr 782 at 7522' 377 at 7517' 625 psi 30 at 7518' 1 at 7531' 14 Klbs 194 at 7518' 69 at 7531' 108 RPM 2744 at 7516' 969 at 7526' 1442 psi GAS SUMMARY: Total Ditch Gas Out: Methane (C-1) Ethane (C-2) Propane (C-3) Butane (C-4) Pentane (C-5) Total Cuttings Gas: Background Gas: ~ 2 [ Connection Gas: NO CG'S High Low ~ at 7515' 1 at 7529' 1000 at 7523' 200 at 7529' at at at at at at at at 1 at 7520' 1 at 7520' units Wiper Gas: units average units max. Trip Gas: Average 2 units 400 ppm ppm ppm ppm ppm 1 units units @ units @ 7521' HYDROCARBONS Other than gas) NONE LITHOLOGY: MAINLY SHALE AND TUFFACEOUS CLAYSTONE WITH SOME SANDSTONE. ABUNDANT METAL PIECES AND METAL SHAVINGS. Epoch Personnel on site: 4 Epoch Day Rate: 1620 IMARATHONOIL COMPANY 05:00AM DEPTH: 7654' Yesterday: 753'1' Casing to Date: 13 3/8" at 327' 9 5~8" at 2563' EPOCH WELL LOGGING MORNING REPORT ~.r-r'v~. I rvr~. 24 Hour Progress: COREA CREEK FEDERAL L,.,~,v,,.,,,o' "~'"'~'" / D · . Dl~,ll¥1Dr....r~ll~ I BIT INFORMATION: No. Size Type 9 8.5" REED HP21G Serial No. Jets Interval PH 6372 13,13,13 7531' Footage Hours Condition DRILLING PARAMETERS: Rate of Penetration Surface Torque Weight on Bit Bit RPM Pump Pressure High Low Average 67 at 7546' 1 at 7532' 22 ff./hr 738 at 7641' 124 at 7623' 656 psi 38 at 7628' 1 at 7531' 25 Klbs 102 at 7603' 20 at 7623' 91 RPM 2863 at 7639' 1190 at 7530' 2547 psi GAS SUMMARY: Total Ditch Gas Out: Methane (C-1) Ethane (0-2) Propane (C-3) Butane (C-4) Pentane (C-5) Total Cuttings Gas: Background Gas: ~ Connection Gas: NO CG'S High Low ~ at 7546' 1 at 7531' 2100 at 7546' 200 at 7531' at at at at at at at at at at units Wiper Gas: units @ units average 0 units max. Trip Gas: 6 units @ Average 4 812 7531' units ppm ppm ppm ppm ppm units HYDROCARBONS 'Other than gas) NONE LITHOLOGY: LITHOLOGIES LOGGED INT THIS SECTION ARE TUFFACEOUS CLAYSTONE AND TUFFACEOUS SI LTSTONE ALSO LOGGED ARE SAND, COAL, AND SHALE. Epoch Personnel on site: 4 Epoch Day Rate: 1620 MARATHON OIL COMPANY DATE: MARCH 25, 1996 05:00AM DEPTH: 7904' Casing to Date: 13 3~8" at 327' 9 5/8" at 2563' Yesterday: EPOCH WELL LOGGING MORNING REPORT 7654' REPORT FOR: 24 Hour Progress: COREA CREEK FEDERAL L. LAMON,S / D. BRIMBERRY BIT INFORMATION: No. Size Type 9 8.5" REED HP21G 10 8.5" RBI Cl SerialNo. Jets Inte~al PH 6372 13,13,13 7531'- 7665' BJ 608 13,13,13 7665' Footage Hours Condition 125' 10 DRILLING PARAMETER`S: Rate of Penetration Surface Torque Weight on Bit Bit RPM Pump Pressure High 164 at 7692' 738 at 7652' 49 at 7691' 309 at 7853' 3132 at 7693' 4 0 21 0 0 Low Avemge at 7651' 34 ff./hr at 7791' 523 psi at 7784' 28 Klbs at 7665' 178 RPM at 7665' 2470 psi GA,S SUMMARY: Total Ditch Gas Out: Methane (C-1) Ethane (C-2) iPropane (C-3) Butane (C-4) Pentane (C-5) Total Cuttings Gas: Background Gas: J 7 ~ Connection Gas: NO CG'S High ~ at 7825' 12355 at 7825' at at at at 4 at 7680' units units average 0 units max. Low 1 at 7652' 99 at 7652' at at at at 1 at 7650' Wiper Gas: Trip Gas: 30 Average 8 units 1647 ppm ppm ppm ppm ppm 2 units units @ units @ 7665' HYDROCARBON,S Other than gas) NONE LITHOLOGY: MOSTLY SAND, TUFFACEOUS CLAYSTONE, SILTSTONE, AND COAL. ALSO LOGGED ARE SHALE AND TUFFACEOUS SILTSTONE. DRILLING AHEAD WITH MUDMOTOR. Epoch Personnel on site: 4 Epoch Day Rate: 1620 MARATHON OIL COMPANY DATE: MARCH 26, '1996 05:00AM DEPTH: 8155' Casing to Date: 13 3/8" at 327' 9 5/8" at 2563' Yesterday: EPOCH WELL LOGGING MORNING REPORT 7904' REPORT FOR: 24 Hour Progress: COREA CREEK FEDERAL # 1 L. LAMONS / D. BRIMBERRY BIT INFORMATION: No. Size Type 9 8.5" REED HP21G 10 8.5" RBI Cl SerialNo. Jets Inte~al PH 6372 13,13,13 7531' 7665' BJ 608 14,14,14 7665' Footage Hours Condition 125' 11 4-6-BT-A E-I-LT-PR 490' 24 DRILLING PARAMETERS: Rate of Penetration Surface Torque Weight on Bit Bit RPM Pump Pressure High 299 at 8082' 768 at 7957' 63 at 8063' 191 at 8066' 3171 at 8065' Low Average 5 at 8126' 34 0 at 8077' 494 7 at 8081' 31 116 at 8059' 169 2093 at 8149' 2521 ff./hr psi Klbs RPM psi GAS SUMMARY: Total Ditch Gas Out: Methane (C-1) Ethane (C-2) Propane (C-3) Butane (C-4) Pentane (C-5) Total Cuffings Gas: Background Gas: ~ 8 ~ Connection Gas: NO CG'S HYDROCARBONS High ~ at 8097' 11200 at 8097' at at at at 5 at 8100' units units average 0 units max. Low 2 at 7923' 400 at 7923' at at at at 1 at 7923' Wiper Gas: Trip Gas: 39 units @ units @ Average 8 1487 2 8155' units ppm ppm ppm ppm ppm units l(Other than gas) NONE LITHOLOGY: MOSTLY SAND, TUFFACEOUS CLAYSTONE, SI LTSTONE, AND COAL. ALSO LOGGED ARE SHALE AND TUFFACEOUS SILTSTONE. DRILLING AHEAD WITH MUDMOTOR. Epoch Personnel on site: 4 Epoch Day Rate: 1620 EPOCH WELL LOGGING MARATHON OIL COMPANY DATE: MARCH 27, t996 05:00AM DEPTH: 82'12' Casing to Date: 13 3/8" at 327' 9 5/8" at 2563' Yesterday: 8155' MORNING REPORT REPORT FOR: 24 Hour Progress: COREA CREEK FEDERAL # 1 L. LAMONS / D. BRIMBERRY BIT INFORMATION: No. Size Type 10 8.5" RBI Cl- VLRG Serial No. Jets Interval BL608 14,14,14 7665' Footage Hours Condition 490' 24 DRILLING PARAMETERS: Rate of Penetration Surface Torque Weight on Bit Bit RPM Pump Pressure High Low Average 20 at 8162' 2 at 8170' 8 ff./hr 819 at 8212' 465 at 8159' 648 psi 32 at 8155' 12 at 8190' 15 Klbs 183 at 8155' 51 at 8156' 65 RPM 2229 at 8155' 953 at 8211' 1131 psi :GAS SUMMARY: High Low !Total Ditch Gas Out: ~ at 8166' 6 at 8212' Methane (C-1) 17069 at 8166' 1199 at 8157' Ethane (C-2) at at Propane (C-3) at at Butane (C-4) at at Pentane (C-5) at at Total Cuttings Gas: 6 at 8160' 2 at 8210 Average Background Gas: ~ Connection Gas: NO CG'S units Wiper Gas: units average 0 units max. Trip Gas: units @ units @ 27 units 5340 ppm ppm ppm ppm ppm 3 units HYDROCARBONS Other than gas) NONE LITHOLOGY: MOSTLY SAND AND SANDSTONE. ALSO LOGGED IN THIS SECTION ARE COAL AND SILTSTONE. PULLING OUT OF THE HOLE TO RECOVER CORE #2. Epoch Personnel on site: 4 Epoch Day Rate: 1620 MARATHON OIL COMPANY DATE: MARCH 28, '1996 05:00AM DEPTH: 8558' Casing to Date: 13 3/8" at 327' 9 5/8" at 2563' Yesterday: 8212' EPOCH WELL LOGGING MORNING REPORT REPORT FOR: 24 Hour Progress: COREA CREEK FEDERAL # 1 L. LAMONS / D. BRIMBERRY BIT INFORMATION: No. Size Type 10 8.5" RBI Cl- VLRG Serial No. Jets Interval BL608 14,14,14 7665' Footage Hours Condition 490' 20.55 .)-3-CD-C12 F-I-CD-CP DRILLING PARAMETERS: Rate of Penetration Surface Torque Weight on Bit Bit RPM Pump Pressure High Low Average 138 at 8345' 3 at 8213' 49 ff./hr 819 at 8212' 0 at 8510' 488 psi 77 at 8408' 17 at 8213' 42 Klbs 264 at 8321' 59 at 8214' 186 RPM 3333 at 8320' 949 at 8213' 2787 psi GAS SUMMARY: Total Ditch Gas Out: Methane (C-1) Ethane (C-2) Propane (C-3) Butane (C-4) Pentane (C-5) Total Cuttings Gas: Background Gas: ~ Connection Gas: NO CG'S High Low ~ 250 ~ at 8285' 6 at 8212' 49791 at 8285' 1200 at 8212' at at at at at at at at 97 at 8370' 2 at 8215' units Wiper Gas: units average 0 units max. Tdp Gas: 104 Average 33 units 6452 ppm ppm ppm ppm ppm 19 units units @ units @ 8215' 'HYDROCARBONS (Other than gas) NONE LITHOLOGY: MOSTLY SAND AND SANDSTONE WITH TUFFACEOUS CLAYSTONE AND COAL. DRILLING AHEAD WITH MUDMOTOR. Epoch Personnel on site: 4 Epoch Day Rate: 1620 MARATHON OIL COMPANY DATE: MARCH 29, '1996 05:00AM DEPTH: 9021' Casing to Date: 13 3/8" at 327' 9 5/8" at 2563' Yesterday: 8558" EPOCH WELL LOGGING MORNING REPORT COREA CREEK FEDERAL # t REPORT FOR: L. LAMONS / D. BRIMBERRY 24 Hour Progresr~'-~ BIT INFORMATION: No. Size Type 11 8.5" ATMGT09 Serial No. Jets Interval Footage Hours F96CM 14,14,14 8215' 804' 26 9019' Condition DRILLING PARAMETERS: Rate of Penetration Surface Torque Weight on Bit Bit RPM 'Pump Pressure High Low Average 299 at 8975' 5 at 8990' 63 ft./hr 962 at 8989' 0 at 8804' 563 psi 79 at 8539' 5 at 8971' 46 Klbs 300 at 8889' 91 at 8990' 166 RPM 3192 at 8529' 1260 at 8990' 2671 psi GAS SUMMARY: Total Ditch Gas Out: Methane (C-1) Ethane (C-2) Propane (C-3) Butane (C-4) Pentane (C-5) Total Cuttings Gas: Background Gas: ~ Connection Gas: NO CG'S High Low Average ~ at 8647' 2 at 8750' 23 units 26300 at 8647' 400 at 8750' 4545 ppm at at ppm at at ppm at at ppm at at ppm 67 at 8639' 2 at 8579' 24 units units Wiper Gas: 35 units @ 8740' units average 0 units max. Tdp Gas: units @ HYDROCARBONS Other than gas) NONE LITHOLOGY: SAND AND SANDSTONE ARE LOGGED IN THIS SECTION AS WELL AS COAL, TUFFACEOUS CLAYSTONE AND TUFFACEOUS SILTSTONE. ALSO LOGGED ARE SHALE, SILTSTONE, AND MUDSTONE. DRILLING BREAKS W/SHOWS FROM TO ROP BEFORE DURING AFTER TOTAL GAS BEFORE DURING AFTER DAILY ACTMTY: DRILLING AHEAD TO 8740'. SHORT TRIP. RUN IN HOLE. WASH FROM 8700' TO 8740'. DRILL AHEAD TO 9019'. C.B.U. PULL OUT OF HO[ Epoch Personnel on site: 4 Epoch Day Rate: 1620 MARATHON OIL COMPANY DATE: MARCH 30, '1996 05:00AM DEPTH: 9286 Casing to Date: 13 3/8" at 327' 9 5/8" at 2563' IBIT INFORMATION: Yesterday: 90'19 EPOCH WELL LOGGING MORNING REPORT COREA CREEK FEDERAL # t REPORT FOR: PETE BERGA / D. BRIMBERRY 24 Hour Progres< 2~~ No. Size Type 11 8.5" ATMGT09 12 8.5" RBI VLRG Serial No. Jets Interval Footage Hours Condition F96C M 14,14,14 8215' 9019' 802' 20 !-I-WT-A-E 14,14,14 9019' 276 DRILLING PARAMETERS: Rate of Penetration Surface Torque Weight on Bit Bit RPM Pump Pressure High Low Average 150 at 9084' 7 at 9045' 39 931 at 9017 140 at 9088' 450 56 at 9149' 33 at 9037' 49 140 at 9067 84 at 9083' 131 2999 at 9020' 1877 at 9271' 2623 FI'/HR FTLBS Kibe RPM PSI GAS SUMMARY: Total Ditch Gas Out: Methane (C-1) Ethane (C-2) Propane (C-3) Butane (C-4) Pentane (C-5) Total Cuttings Gas: Background Gas: 2L~LJ Connection Gas: 20u @ 9059 High Low Average ~ at 9241' 4 at 9017 29 36530 at 9241' 800 at 9017' 5588 at at at at at at at at 75 at 9060' 5 at 9230' 20 units Wiper Gas: units @ units average 20 units max. Tdp Gas: 188 units @ 9019' units ppm ppm pprn ppm ppm units HYDROCARBONS Other than gas) NONE. LITHOLOGY: SANDSTONE AND SAND ARE LOGGED IN THIS SECTION AS WELL AS TUFFACEOUS CLAYSTONE AND TUFFACEOUS SILTSTONE AND COAL. ALSO LOGGED ARE SHALE, SILTSTONE AND MUDSTONE. DRILLING BREAKS W/SHOWS FROM TO ROP BEFORE DURING AFTER TOTAL GAS BEFORE DURING AFTER NONE DAILY ACTIVITY: RIH DRILL AHEAD TO PRESENT DEPTH AT 5 A. M. Epoch Personnel on site: 4 Epoch Day Rate: 1620 MARATHON OIL COMPANY DATE: MARCH 3'1, '1996 05:00AM DEPTH: 9526' Casing to Date: 13 3/8" at 327' 9 5/8" at 2563' Yesterday: 9286' EPOCH WELL LOGGING MORNING REPORT COREA CREEK FEDERAL REPORT FOR: PETE BERGA/D. BRIMBERRY 24 Hour Progres. 2~._~ BIT INFORMATION: No. Size Type 12 8.5" RBI C1VLRG Sedal No. Jets Interval Footage Hours Condition BJ-498 14,14,14 9019' 9526' 507' 27 DRILLING PARAMETERS: Rate of Penetration Surface Torque Weight on Bit Bit RPM Pump Pressure High Low Averaae 200 at 9447' 4 at 9525' 33 FT/HR 694 at 9387' 119 at 9309' 444 FTLBS 59 at 9396' 18 at 9301' 49 Klbs 145 at 9521' 59 at 9429' 133 RPM 3082 at 9434' 1877 at 9274' 2589 PSI GAS SUMMARY: Total Ditch Gas Out: Methane (C-1) Ethane (C-2) Propane (C-3) Butane (C-4) Pentane (C-5) Total Cuttings Gas: Background Gas: ~ Connection Gas: NO CG'S High Low Average ~ at 9241' 6 at 9525' 24 units 36530 at 9241' 1200 at 9525' 4629 ppm at at ppm at at ppm at at ppm at at ppm 40 at 9330' 2 at 9525' 10 units units Wiper Gas: 60 units @ 9365' units average 0 units max. Tdp Gas: N/A units @ 9526' HYDROCARBONS (Other than gas) NONE. LITHOLOGY: MOSTLY COAL, SAND AND SANDSTONE, AND CONGLOMERATIC SANDSTONE ARE LOGGED IN THIS SECTION. ALSO LOGGED ARE TUFFACEOUS CLAYSTONE, TUFFACEOUS SILTSTONE, SHALE AND SOME MUDSTONE. DRILLING BREAKS WI SHOWS FROM TO ROP BEFORE DURING AFTER TOTAL GAS BEFORE DURING AFTER DAILY ACTIVITY: DRILL AHEAD TO 9365' SHORT TRIP. RIH. DRILL AHEAD TO 9526' CBU. PULL OUT OF THE HOLE. Epoch Personnel on site: 4 Epoch Day Rate: 1620 MARATHON OIL COMPANY DATE: APRIL 1, 1996 05:00AM DEPTH: 9694' Casing to Date: 13 3/8" at 327' 9 5/8" at 2563' Yesterday: 9526' EPOCH WELL LOGGING MORNING REPORT COREA CREEK FEDERAL # 1 REPORT FOR: PETE BERGA/D. BRIMBERRY 24 Hour Progres~.~ ~68' ~ BIT INFORMATION: No. Size Type 12 8.5" RBI ClVLRG 13 8.5" RBIC2VLRG Sedal No. Jets Interval Footage Hours Condition BJ-498 14,14,14 9019' 9528' 509' 24.5 NO GOOD B J-500 14,14,14 9528' 9694' 168' 12 GOOD DRILLING PARAMETERS: Rate of Penetration Sudace Torque Weight on Bit Bit RPM Pump Pressure High Low AveraRe 164 at 9626' 4 at 9551' 32 FT/HR 952 at 9660' 287 at 9526' 798 FTL BS 62 at 9614' 39 at 9534' 55 Klbs 141 at 9583' 101 at 9625' 135 RPM 2846 at 9528' 2146 at 9555' 2691 PSI GAS SUMMARY: Total Ditch Gas Out: Methane (C-1) Ethane (C-2) IPropane (C-3) !Butane (C-4) Pentane (C-5) Total Cuttings Gas: Background Gas: I '10 I Connection Gas: NO CG'S High Low Average ~ at 9584' 4 at 9670' 15 units 13383 at 9584' 800 at 9670' 2920 ppm at at ppm at at ppm at at ppm at at ppm 45 at 9630' 5 at 9670' 23 units units Wiper Gas: N/A units @ N/A units average 0 units max. Trip Gas: 94 units @ 9528' HYDROCARBONS Other than gas) NONE. LITHOLOGY: MOSTLY COAL, SAND AND SANDSTONE, AND CONGLOMERATIC SANDSTONE ARE LOGGED IN THIS SECTION. ALSO LOGGED ARE TUFFACEOUS CLAYSTONE, TUFFACEOUS SILTSTONE, SHALE AND SOME MUDSTONE. DRILLING BREAKS WI SHOWS FROM TO ROP BEFORE DURING AFTER TOTAL GAS BEFORE DURING AFTER NONE 'DAILY ACTIVITY: FINSIH POOH. CHANGE BIT. RIH. DRILL AHEAD TO PRESENT DEPTH. Epoch Personnel on site: 4 Epoch Day Rate: 1620 MARATHON OIL COMPANY DATE: APRIL 2, t996 05:00AM DEPTH: 9738' Casing to Date: 13 318" at 327' 9 518" at 2563' BIT INFORMATION: Yesterday: 9694' EPOCH WELL LOGGING MORNING REPORT COREA CREEK FEDERAL REPORT FOR: PETE BERGA I D. BRIMBERRY 24 Hour Progres.~_~_~ No. Size Type 12 8.5" RBI C1VLRG 13 8.5" RBIC2VLRG Serial No. Jets Interval Footage Hours Condition BJ-498 14,14,14 9019' 9528' 509' 24.5 3-3-BT-I BJ-500 14,14,14 9528' 9738' 210' 17 E-1-N-ROF ;DRILLING PARA~ETERS: High Low Averaee Rate of Penetration Surface Torque Weight on Bit Bit RPM Pump Pressure GAS SUMMARY: 95 at 9686' 7 at 9682' 18 540 at 9723' 278 at 9678' 510 58 at 9694' 53 at 9686' 55 137 at 9678' 134 at 9738' 134 2640 at 9678' 2546 at 9721' 2574 High Low FT/HR FTLBS Klbs RPM PSI Total Ditch Gas Out: Methane (C-1) Ethane (C-2) Propane (C-3) Butane (C-4) Pentane (C-5) Total Cuttings Gas: Background Gas: ~ Connection Gas: NO CG'S Average ~ at 9686' 2 at 9736' 6 6360 at 9686' 300 at 9736' 1144 at at at at at at at at 16 at 9689' 3 at 9737' 9 units Wiper Gas: 98 units @ 9738' units average 0 units max. Tdp Gas: units @ 9738' HYDROCARBONS units ppm ppm ppm ppm ppm units 'Other than gas) LITHOLOGY: NONE. MOSTLY TUFF, SAND AND SANDSTONE AS WELL AS CONGLOMERATIC SANDSTONE ARE LOGGED IN THIS SECTION. ALSO LOGGED ARE SHALE AND TUFFACEOUS CLAYSTONE. COAL WAS LOGGED. )RILLING BREAKS WI SHOWS FROM TO ROP BEFORE DURING AFTER TOTAL GAS BEFORE DURING AFTER NONE :DAILY ACTIVITY: DRILL AHEAD TO 9738' SHORT TRIP 20 STANDS. CBU. PULL OUT OF THE HOLE. TIGHT AT ABOUT 7350'. Epoch Personnel on site: 2 Epoch Day Rate: 1620 MARATHON OIL COMPANY DATE: APRIL 3, '1996 05:00AM DEPTH: 9738' Casing to Date: 13 3/8" at 327' 9 5/8" at 2563' Yesterday: EPOCH WELL LOGGING MORNING REPORT COREA CREEK FEDERAL REPORT FOR: PETE BERGA/D. BRIMBERRY 9738' 24 HourProgres~ 0' ~ BIT INFORMATION: No. Size Type 13 8.5" RBIC2VLRG ER13 8.5" RBIC2VLRG Serial No. Jets Interval B J-500 14,14,14 9528' B J-500 14,14,14 REAM Footage Hours 9738' 210 13.7 Condition 2-2-WT-A EF-N-TD DRILLING PARAMETERS: Rate of Penetration Surface Torque Weight on Bit Bit RPM Pump Pressure GAS SUMMARY: N/A N/A N/A N/A N/A High at at at at at Low at at at at at High Low Averafle Average FT/HR FTLBS Klbs RPM PSI Total Ditch Gas Out: Methane (C-1) Ethane (C-2) Propane (C-3) Butane (C-4) .Pentane (C-5) Total Cuttings Gas: Background Gas: ~ Connection Gas: NONE ~ at 18976 at at at at at at 9738' 9738' 7 1397 at VARIABLE at VARIABLE at at units Wiper Gas: 88 units average 0 units max. Trip Gas: 95 units units 10 1989 7334' 9738' units ppm ppm ppm ppm ppm units HYDROCARBONS Other than gas) LITHOLOGY: NOTE: GAS READINGS OF 88 UNITS AT 7334'. 50 UNITS AT SECOND BRIDG 95 UNITS FROM 9738'. MOSTLY SAND AND SANDSTONE WITH COAL WERE SEEN AT THE SURFACE. DRILLING BREAKS WI SHOWS FROM TO ROP BEFORE DURING AFTER TOTAL GAS BEFORE DURING AFTER NONE DALLY ACTIVITY: REAM TIGHT SPOTS. CIRC TO CONDITIOIN HOLE AND MUD BEFORE RUNNING E-LOGS. Epoch per~'~)~nel on site: 2 Epoch Day Rate: 1220 IMARATHON IJ,~. I r', ~rl~lL q., 05:00AM DEPTH: 9738' Casing to Date: 13 3/8" at 327' 9 5/8" at 2563' Yesterday: EPOCH 9738' WELL LOGGING MORNING REPORT COREA CREEK FEDERAL REPORT FOR: L. LAMONS I D. 8RIMBERRY 24 HourProgres~ 0' ~ BIT INFORMATION: No. Size Type Serial No. RR13 8.5" RBIC2VLRG BJ-500 Jets Interval Footage Hours Condition 14,14,14 REAM WASH MANY PLENTY USED DRILLING PARAMETERS: High Rate of Penetration N/A at Surface Torque at Weight on Bit at Bit RPM at Pump Pressure at Low Averaqe at FT/HR at FTLBS at Klbs at RPM at PSI GAS SUMMARY: High Total Ditch Gas Out: ~ at Methane (C-1) at Ethane (C-2) at Propane (C-3) at Butane (C-4) at Pentane (C-5) at Total Cuttings Gas: at Background Gas: ~ units Connection Gas: units average units max. Low Average at units at ppm at ppm at ppm at ppm at ppm at units Wiper Gas: units @ Trip Gas: units @ HYDROCARBONS Other than gas) LITHOLOGY: DRILLING BREAKS W/SHOWS FROM TO ROP BEFORE DURING AFTER TOTAL GAS BEFORE DURING AFTER NONE DAILY ACTIVITY: RUN WIRELINE LOGS. RUN #1 AND RUN #2. Epoch Personnel on site: 2 Epoch Day Rate: 12:20 MARATHON OIL COMPANY DATE: APRIL 5, '!996 05:00AM DEPTH: 9738' Casing to Date: 13 3/8" at 327' 9 5/8" at 2563' Yesterday: EPOCH 9738' WELL LOGGING MORNING REPORT COREA CREEK FEDERAL # '1 REPORT FOR: L. LAMON$ I D. BRIMBERRY 24 Hour Progres.~ 0~_~ BIT INFORMATION: No. Size Type Serial No. RR13 8.5" RBIC2VLRG B J-500 Jets Interval Footage Hours Condition 14,14,14 0' CLEAN UP RUN DRILLING PARAMETERS: High Rate of Penetration at Surface Torque at Weight on Bit at Bit RPM at Pump Pressure at IGA$ SUMMARY: High Total Ditch Gas Out: ~ at Methane (C-1) 18391 at Ethane (C-2) at Propane (C-3) at Butane (C-4) at .Pentane (C-5) at ~Total Cuttings Gas: at Background Gas: ~ Connection Gas: NO CG'S Low Avera.qe at FT/HR at FTLBS at Klbs at RPM at PSI Low 9738' 3 at 9738' 9738' 593 at 9739' at at at at at units Wiper Gas: N/A units average 0 units max. Trip Gas: 92 units @ units @ Average 5 996 9738' 9738' units ppm ppm ppm ppm ppm units HYDROCARBONS (Other than gas) LITHOLOGY: MOSTLY COAL AND SAND WITH SOME SANDSTONE SEEN AT THE SURFACE. DRILLING BREAKS W/SHOWS FROM TO ROP BEFORE DURING AFTER TOTAL GAS BEFORE DURING AFTER NONE DAILY ACTIVITY: FINISH LOG RUN #2. RUN IN THE HOLE WITH PIPE. C.B.U.P.O.O.H. FOR LOG RUN # 3. Epoch Personnel on site: 2 Epoch Day Rate: 1220 .. .'= ';' n r "',, ,, . . W~LL LOGGING Yes~.erday: COREA CREEK FEDERAL # ! REPORT FOR: L. LAMONS / D. BRIMBERRY 2.4 Hour Progres~ G' J Hours Condition I !rv'iARATHON OiL CO.,'v!PANY ! I ..... APRIL 6, 1996 I I I ,u~:OO~N, DEPTH: I I I,,~, l~_.asmg to Date: i 3 3i8" at 327' [ I I I IBIT INFOR~iATION: I I Size -r .... e,~,;a, kl~ I 1 I 1 ! iDRiLLiNG PARA~'GETERS: JR,.,,,.. o,, ,..n,.,, at:o,, NIA at NIA ,,'-* , ,,,-,ku~ ,='r~uR,,, ,, jSu.dace Torque at at ~L BS JtAt_:--Ll... C):L L iBJt RPM at at R Pl~.4 jPump Pressure at at PSi ]GAS SUMMARY: High Lcw Aver,~ge iTotai Ditch Gas Out: i NiA I at at units Methane (C-1) at at ppm Ethane (C-2) ' at at ppm Butane ~C-4, at at ppm Pentane (C-~) at at ppm Total Cuttings Gas' i . at ai un]is I iBackgroundGas: ! N/A I ,,nits Wiper Gas: N/A ,-nAs @ 9738' ]Connection Gas: units averaae units max. Trip Gas: N/A ..... ~ 9738' Lilllt~ -- I - I HYDROCARBONS (Other than gas) I ILITHOLOGY: High Low Averaqe DRILLING BREAKS W/SHOWS FROM TO POP BEFORE DURING AFTER TOTAL GAS BEFORE DURING AFTER IDAILY ACTMTY: ......... 4. " .... ~-4. FINISH LOG RUN NUMBER 3. MAr~c READY FOR LOG RUN NuMo,-~ START LOG nw,~ GOT STUCK FISH FOR STUCK TOOLS. I I I iEpoch Personnel on site: L MARATHON OIL COMPANY DATE: APRIL 7, 1996 05:00AM DEPTH: 9738' Casing to Date: 13 3/8" at 327' 9 5/8" at 2563' Yesterday: EPOCH 9738' WELL LOGGING MORNING REPORT COREA CREEK FEDERAL REPORT FOR: L. LAMONS / D. BRIMBERRY 24 HourProgres~.~ 0' ~ BIT INFORMATION: Size Type Serial No. Jets Interval Footage Hours Condition DRILLING PARAMETERS: High Rate of Penetration N/A at Surface Torque at Weight on Bit at Bit RPM at Pump Pressure at Low Avera~le N/A at N/A FT/HR at FTLBS at Klbs at RPM at PSI GAS SUMMARY: High Total Ditch Gas Out: ~ at Methane (C-1) 12798 at Ethane (C-2) at Propane (C-3) at Butane (C-4) at Pentane (C-5) at Total Cuttings Gas: at 9738' 9738' Low Average 5 at 9738' 8 units 998 at 9738' 1592 ppm at ppm at ppm at ppm at ppm at units Background Gas: ~ Connection Gas: NO CG'S units units average 0 units max. Wiper Gas: N/A units @ 9738' Tdp Gas: 64 units @ 9738' 'HYDROCARBONS '(Other than gas) LITHOLOGY: MOSTLY SAND AND SANDSTONE WITH COAL WERE SEEN AT THE SURFACE. DRILLING BREAKS W/SHOWS FROM TO ROP BEFORE DURING AFTER TOTAL GAS BEFORE DURING AFTER DAILY ACTIVITY: RECOVER FISH. RIH. CBU. POOH. GET READY TO RUN CASING. Epoch Personnel on site: 2 Epoch Day Rate: 1220 MARATHON OIL COMPANY DATE: APRIL 8, '1996 05:00AM DEPTH: 9738' Casing to Date: 13 3/8" at 327' 9 5/8" at 2563' Yesterday: EPOCH 9738' WELL LOGGING MORNING REPORT COREA CREEK FEDERAL REPORT FOR: L. LAMONS / D. BRIMBERRY 24 Hour Progress. oLLJ BIT INFORMATION: Size Type Sedal No. Jets Interval Footage Hours Condition DRILLING PARAMETERS: High Rate of Penetration N/A at Surface Torque at Weight on Bit at Bit RPM at Pump Pressure at Low Averat:le N/A at N/A FT/HR at FTLBS at Klbs at RPM at PSI GAS SUMMARY: High Total Ditch Gas Out: ~ N/A ~ at Methane (C-1) at Ethane (C-,2) at Propane (C-3) at Butane (C-4) at Pentane (C-5) at Total Cuttings Gas: at Background Gas: ~ Connection Gas: NONE units units average 9738' un~s max. Low Average N/A at 9738' N/A units at ppm at ppm at ppm at ppm at ppm at units Wiper Gas: N/A units @ 9738' Tdp Gas: N/A units @ 9738' HYDROCARBONS (Other than gas) LITHOLOGY: NO CIRCULATING DRILLING BREAKS WI SHOWS FROM TO ROP BEFORE DURING AFTER TOTAL GAS BEFORE DURING AFTER DALLY ACTIVITY: RIG UP WEATHERFORD AND RUN CASING. Epoch Personnel on site: 2 Epoch Day Rate: 1220 EPOCH WELL LOGGING MARATHON OIL COMPANY DATE: APRIL 9, 1996 05:00AM DEPTH: 9738' Casing to Date: 13 3/8" at 327' 9 5~8" at 2563' Yesterday: MORNING 9738' REPORT COREA CREEK FEDERAL # 1 REPORT FOR: L. LAMON$ I D. BRIMBERRY 24 Hour Progres~ 0[_._.~ BIT INFORMATION: No. Size Type Serial No. Jets Interval Footage Hours Condition DRILLING PARAMETERS: Rate of Penetration Surface Torque Weight on Bit Bit RPM Pump Pressure N/A High at at at at at N/A Low Averal:le at N/A FT/HR at 0 FTLBS at 0 Klbs at 0 RPM at 580 PSI GAS SUMMARY: Total Ditch Gas Out: Methane (C-1) Ethane (C-2) Propane (C-3) Butane (C-4) Pentane (C-5) Total Cuttings Gas: Background Gas: ~ Connection Gas: NONE units units average High at at at at 9738' N/A units max. Low Average at 9738' N/A units at ppm at ppm at ppm at ppm at ppm at units Wiper Gas: N/A units @ 9738' Trip Gas: N/A units @ 9738' HYDROCARBONS Other than gas) LITHOLOGY: N/A CEMENTING GASES ~ MAX GAS FI CIR 'IST STAGE = 38u, AVG GAS = 8u IVIAX GAS DURING DSPL OF 'IST STAGE CMT = 8u, AVG 4u MAX GAS FI ClR 2ND STAGE = 2u, AVG GAS = 'lu MAX GAS DURING DSPL OF 2ND STAGE CMT = lu DAILY ACTIVITY: RUN AND CMT CSG Epoch Personnel on site: 2 Epoch Day Rate: 1220 Alaska ~ ,,, ,. Domestic Pi:oduction Marathon Oil Company P.O. Box 196168 Anchorage, AK 99519-6168 Telephone 907/561-5311 May 21, 1996 ARCO Alaska, Inc. Attn: Mr. Pat Foley P. O. Box 100360 Anchorage, AK 99510-0360 Bureau of Land Management Attn: Joe Dygas 6881 Abbott Loop Rd. Anchorage, AK 99507-2591 Alaska Oil & Gas ConserVation Commission Attn: Mr. Howard O~{kland 3001 Porcupine Drive Anchorage, AK 99501-3192 Chevron USA, Inc. Attn: Mr. Paul Walker P. O. Box 1635 Houston, TX 77251-1635 Mr. Cliff Burglin P. O. Box 131 Fairbanks, AK 99707-0131 RE: Marathon Corea Creek Federal #1 Well Data Section 12, T1N, R13W Kenai Peninsula Borough, AK Gentlemen: A listing of the enclosed data is supplied to you for the above mentioned well. These are hard copy formats of the data which is associated with the drilling of the well to the total depth of 9,738 feet. We will forward additional data as it becomes available. Please consider this information confidential and for use only within your organization. DLB/kz:EXPL\ccrk0521.1tr Enclosures A subsidiary of USX Corporation Environmentally aware for the long run. Marathon Corea Creek Federal #1 Well Data Section 12, TIN, R13W Kenai Peninsula Borough, AK Enclosures Enclosed are one blueline and one sepia copy of each of the following logs: After Squeeze One, Cement Evaluation Log Squeeze Gun, 9302'-9304', 4/10/96 Formation Micro Imager Run #2 CBT Cement Bond Log After Squeeze One CBT CET-GR Cement Evaluation Cement Retainer Set 9280', 4/15/96 5/21/96 PETROLEUM SERVICEE~ TO: The material Description of materials: ..5 5n~~s' ore listed below is being forwarded by: , . Shipped By. '~~~ Date Shipped- Please mail or fax a signed copy of this transmittal upon receipt of materials. Received By' Core Laboratories, Inc. 3430 Unicorn Road, Bakersfield, California 93308, (805) 392-8600, Fax (805) 392-0824 Fax #: (805) 392-0824 RECEIVED Date' MAY 1 3 1991; Alaska 011 & Gas Cons. Commission Anchorage PETROLEUM SERVICES TO: TRANSMI~AL AND ACKNOWLEDGMENT OF RECEIPT ALASKA OIL AND GAS COMMISSION ANCHORAGE, AK -) MA TERIALS RECEIVED VIA: CORE LAB PERSONNEL ITEMS RECEIVED: COREA CREEK #1 CORE 1 DEPTH DEPTH DEPTH DEPTH '-'5825 "5844 ~'5863 ¢8155 v5826 ~845 ~156 ~"'5827 ~.8.~6....,,~ ~5865 ~5828 ~-'-~4Z ~ ~"5866 ¢. 8158 ¢5829 "~'~8~'~' .... ¢5867 ~159 -5830 ¢5849 ¢5868 ~'8160 ~5831 ~5850 ~869 ~"8161 ~5832 ~5851 '~'"5870 ~8162 -5 33 ¢'5834 ~853 ~5872 '"8164 ~835 ~5854 ¢'8165 4 36 ~' 5838 ,-5857 ~8168 ¢'5839 ~858 ~169 ~5841 ¢5860 ~171 ~5842 ¢ 5861 ~172 ~843 ~862 ~173 CORE CHIP SAMPLES CORE 2 DEPTH. ~-'8174 '-'8175 ~8176 -8177 -8178 '-'8179 ~8180 ~--8181 ~8182 '-'8183 '-'8184 ~185 '~8205 ,,'8188 ~/8189 r/'8190 v8191 ,.-'8192 ~,- 8208 ,..--8210 DEPTH .~-8194 ,-~195 ~--8196 ,8197 ~8198 ~8199 ~8200 ¢8201 ~202 Shipped by: .P~~ Received by: for CORE LAB for AOGC Date: :'-¢ 0 3 ~.998 Please note that the items listed above are inventoried, shipped and received in good faith, but due to errors, are subje~.~itii'r~ia~j~ll~l~, In such case both shipper and receiver agree to make a timely and bona fide effort to correct any observed discrepancies. CORE LABORATORIES, INC. 13671 KAREN ST. ANCHORAGE, AK99515 (907) 349-,3541 ., Alaskai Domestic Production Marathon Oil Company P.O. Box 196168 Anchorage, AK 99519-6168 Telephone 907/561-5311 April 29, 1996 ARCO Alaska, Inc. Attn: Mr. Pat Foley P. O. Box 100360 Anchorage, AK 99510-0360 Chevron USA, Inc. Attn: Mr. Paul Walker P. O. Box 1635 Houston, TX 77251-1635 Bureau of Land Management Attn: Joe Dygas 6881 Abbott Loop Rd. Anchorage, AK 99507-2591 Alaska Oil & Gas Conservation Commission Attn: Mr. Howard Oakland 3001 Porcupine Drive Anchorage, AK 99501-3192 Mr. Cliff Burglin P. O. Box 131 Fairbanks, AK 99707-0131 RE: Marathon Corea Creek Federal #1 Well Data Section 12, T1N, R13W Kenai Peninsula Borough, AK Gentlemen: A listing of the enclosed data is supplied to you for the above mentioned well. These are hard copy formats of the data which is associated with the drilling of the well to the total depth of 9,738 feet. We will forward additional data as it becomes available. Please consider this information confidential and for use only within your organization. Exploitation Manager DLB/kz:EXPL\ccrk0429.1tr Enclosures subsidiary of USX Corporation Environmentally aware for the long run. Marathon Corea Creek Federal #1 Well Data Section 12, T1N, R13W Kenai Peninsula Borough, AK Enclosures 1) 3) 4) 5) Sundry Data Directional Data Core Data .-- Daily Drilling Reports Logs: Formation Log TVD (blueline, color & sepia) Formation Log MD (blueline, color & sepia) -' Drilling Dynamics ..- Natural Gamma Ray Spectrometry Log - Run 2 -- Dipole Sonic Imager/GR - Run 2 Array Induction/GR - Run 2 Litho-Density/Neutron - Run 2 .-"' Phasor Induction-SFL - Run 1 (blueline & sepia)~' LDT/CNL/GR - Run 1 (b. fueline & sepia) ,.. TVD Correlation-Phasor Induction/SFL - Run 1 (blueline & sepia)j TVD Correlation-LDT/CNL/GR - Run 1 (blueline & sepia) .non Oil Company ; 2-23-96 ;ll:45AM Anchorage-, 907 276 7~42;# 2/ 2 1. Type ef Reque~ STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS Abamo~ Sum,mi__ Nter Caaa~ __ Repair W~ 2. Name of Opem~ MARATHON OIL COMPANY 3. P, O, Box 1~188 AK 4. LoBation of We# at Surfaoe 1567' FSL & 1573' FEL SEC 12 T1N Rl~ S.M. At~~l~ ~ FSL & ~ F~ SEC 12 T1N RI~ S,M. AT N Eff~ O~ 1 ~ FNL ~ 3~ ~L SEC 12 T1N ~ FNL & ~~ SEC 12T1N COREA CREEK FEDERAL e. Pe~. Number ... lO. APl Numl~r 1 t. FJl/P~I .................... WILDCAT/TYONEK NOT SPUDOED. ESTIMATED SPUD DATE IS FEBRUARY 24~ Ca,nO OOnglu~ proo'uomm ~ fa~ ~unk (meaaumd) tme wfttcai Tubing (size, grade, and memured depth) P~ am sssv (ty~ and menmed Oef~h) 13. Athchmenm Alaska Oil & Gas Cons. Commission Anchorage Ol~ratim~ Program.._. BOP Sierra 14. EffiJfllM~l Date fro' ~ng Opemti~ t 16. ~ of Well 1:3a~ira=atio~ as: FEBRUARY' 24, 191~ Name ~f 11. I ~W ~ ~fe DRI~NG SUPERINTENDENT FOF COMMISSION U~ ONLY ~ Approval: I p~ Integrity BOPyesl ~ ... Al~lO~'oveO ay Om~ of the Commission '~ ORIGINAL ~Date 2/23/10ge Notify Comrnnsmn, repre.tative ma ' w~tneae '~'~~"~"~ ...~ _, .... ~:~. ,~..e=.,~' ' ~lmic~. .chon 011 Company ; 2-23-96 ;10:14,~t Anchorage-, S07 276 7~42;# 3/ 9 COREA CREEK FEDERAL #1 MARATHON RECENTLY GAINED ACCESS TO ADDITIONAL GEOPHYSICAL INFORMATION THAT IMPACTS THE OPTIMAL LOCATION FOR THE SUBJECT WELL BASED ON THE REVISED STRUCTURAL INTERPRETATION, MARATHON PROPOSES TO DIRECTIONALLY DRILL A ~' SHAPED WELL WITH A TOTAL DISPLACEMENT AT TD OF APPORIMATELY 30a0'. THE REVISED TARGETS OF THE WELL ARE AS FOLLOWS: SURFACE LOCATION: INTERMEDIATE TAGETS: AT 5208' TVD AT 8000' TVD 1587' FSL & 1573' FEL OF SECTION 12 TIN R13W SM 2957' FSL & 2959' FEL OF SECTION 12 T1N R13W SM 1600' FNL & 1800' FWL OF SECTION 12 T1N R13W SM PROPOSED BOTTOM HOLE LOCATION: AT g000' TVD 1800' FNL & 1800' FWL OF SECTION 12 T1N R13W SM THE DIRECTIONAL PLAN 18 SUCH THAT THE ENTIRE WELL BORE WILL BE WITHIN ETANDARD SPACING REQUIREMENTS FOR AN EXPLORATORY GAS WEM.. DIRECTIONAL PLAN: NORTH WEST VERTICAL MD TVD INCL AZIM COORD COORil SECTION RKB ~ ~ 0 0 0' ~ 0' KICK OFF POINT 1199' 1199' 0 0 O' O' END OF BUILD 2400' 2348' 30.03 315.08 218' 21T 308' END OF HOLD 8723' 6088' 30.03 315.08 1750' 1745' 2471' END OF DROP 8725' 8000' O 0 2113' 210T 2984' PROPOSED TD 9725' 9000' 0 0 2113' 2197' 2984' A PLAT AND DETAILED DIRECTIONAL LISTING ARE ATTACHED. ~:hon Oil Company ' 2-23-06 '10'15AM ; Anchorage-, 007 276 7542;# 4/ 0 450 0 . · ]__ - · 8100, , ?,~0 f.2..~ 17.~0 .. MARATHON Oil Company ., 2~ 30.~ 319.~ ~ 218 -317 ~51 67~3 ~,~ 31 ~M e~ ~ 7~ - 1745 0.~ 8~ 0.~ 31 ~ ~ 2113 -2107 I 1 ; I 'l I i 1 I --i i I I i --*~'- l 450 O 4:50 gOO 1.I50 1BO0 22~0 2700 3150 ~1~ I t 2~.~ . .1800 '- 1600 .1200 .fOG0 oZ · ~hon Oi I Company Anchorage~ 807 276 7542 slot #1 CLam Outtch, AL~mlul PI~OPOSAL L I ST I NG ~r H~hl~ INT£Q Your ref: Corem Ck Our ref I Proi)1237' LJem,me: Date printed: ZZ-Feb-96 Date creeled: 18-1#y-9~ I.aet: r~ieed: 22-F~-96 Fle{d Is contr.d m r~) 48 Zl.~&,w150/,9 18.~T Structure te centred on r,~O 11 5.32~,w151 Z6 3Z.388 stol location le ru~6 11 ZO. TTg,u151 27 3.~,97 8tot Or~d coordinate~ are N 22~9~.1~, E ~91T,~ Slot L~L ~J~t~ ere 1567.00 N 15~.00 U R~e~e No~h [8 T~ ~rth J 'tvED FEB 23 1996 Alaska Oil & Gas C~ns. Comm~ion Anchorage Oil Company ; 2-23-96 ;10'15AM ; Anchorafe- 907 276 7542;# 6/ 9 NAIATHON 011 Cmqm~ny PRCW'I:I~,L LISTU/Q Pege 1 Corem CreMe Federal #1,CC~r#I Tour rtl : COl'e~ Ck Feckll Vert. il Expiormttm, Cim Guttch, A~aaka LMt reviraed: ~.-Feb-96 ~ured ZncLffl. Azimuth true vert. R; C T A N o u L A R DogLeg Ver~ Depth Degree~ Degrees Dqmth C 0 0 n D Z # A Z E S Deg/lOOFt Sect 0.00 0.00 315.08 0.00 500.00 O.OO 315.00 1000.00 O.aO 3la.OB 1000.00 I$98.74 0.00 315.00 1198.74 1298. T& ~,$0 315.08 12~8.71 1398.74 5.08 315,00 1398.¢9 I&98. T& ?.SO 3~5.M ILgT. M 1~.74 12.50 315.~ 1~.~ I~.7~ 15.00 315.~ 1898.7& 17.50 315.00 1MT. 91 1998.7, 20.00 315.00 1912,59 Eogs.?4 ~.50 ;315.00 20TS. r8 2198.7& Z5,00 315.08 2167.31 2296.74 27.50 315.M 2256.99 2.T98.7& 30.00 313,08 23&&. M) O.~N O.~E 0.~ 0.~ O.~# 0.00£ 0.~ 0,00 0.00N 0.00E 0.~" 0.~ O.~N O.~E 0.~ 0.~ 1.5~# 1.~g 2.50 2.18 6.18 N 6.16 I/ 2.50 8.~ 13.88 N 13.84 ti 2.50 19.61 24.M # 24,58 Id 2.50 34.82 ~.47 N 38.36 W 2.50 54,32 55.30 N 55.I& ~1 2.50 71.09 ._.. 75,11 # 74.90 g 2.50 106.07 97.a? M 97.59 V 2.50 138,21 1Z~.53 M 1Z3.18 g Z.50 17'4.46 152.0S N 151,65 g 2.50 21&.73 183.37 W 182.~5 ti 2.50 258.~ 217.42 N 216.81 I/ 2.50 307.05 24~0.00 30,03 :513,08 ~¢$.73 217.8r # 217.~5 ti 2.50 307.68 EC)C - 9 5/8" CSG Pt 2500.00 30.03 31S.00 ~32.32 253.31 N 252.59 V 0.00 357.72 3000.00 30.03 315.00 2865.20 430.50 N 429.28 g O.OO 607.96 3500.00 30.03 315.00 3298.07 60~.70 # 605.98 Y 0.00 858.20 &aO0.O0 30.03 315.00 3730,SPJ 711~,90 # 7'82.67 IJ O.O0 1108.~ 4500.00 :30,03 315.08 4163.82 96~.09 M 9S9.36 i/ 0.00 1358,68 SO00. O0 30.03 $15,00 &596.~ 1139.29 N 1136.06 ti 0.00 16O8.~1 5SO0.0a 30.03 315.08 50Z9.57 1316.49 N 1312.73 I/ 0.00 1859.15 5i'06.10 30.03 315.00 5~08.00 138~.5Z N 138S.58 H 0.00 1967.30 TARGET 6000.00 30.03 31S.08 S46Z.~S 1;.gZ.6a . 1~09.~. , o.ao 2109.3; 6500,0030.03 31s.00 5095,32 1670.a8 id 1666.1& u 0.00 zssg.63 6722,93 30.0~ 31S,08 6086,32 1749.08 W 17M~.91 g 0,00 2&TI.20 8egtn AngLe Drop 672S.0C3 30.00 315,00 6090.14 1750.63 Ii 1T~5.66 ti 1.~0 2/,72.25 6825,03 ZIl~O 31S.00 6177.39 J785.~ id 1780.1618 1.JO 2S21,11 69~5,03 2T. O0 315,08 6265,M 1818,20 N 1813.03 U 1.50 2567.67 fl);~5,03 25.50 315,0~ 6355,57 18&9.51 N 184~.26 g 1.50 2611.90 712S,03 24.00 315,00 6486.38 q879,16 Il 187~.82 W 1.50 2653,76 T225,03 22.50 315.08 6538.26 1907,11 N 1901.70 V 1.50 2693,~ 7325.03 21.00 315.00 66:11.14 1933.35 id 19Lrr.861i 1.50 2730.29 ? .03 6.so s, .00 zoo,.,, lm.93, rr s.o3 ,5.ae 3,5.00 7o,,.38 zo,s. ov 1.5o FEB 2 3 1996 7125.03 13.50 315.08 7'108,30 zo38,Zi, If Zo3z,~8 w 1.S0 ~71,45 7~2s.03 lz.oo 31s.08 720s.s4 2o53.89 If zo4a.06 v1.50 zgoo. s~aska Oil& Gas Cons. 80u.03 10.50 315.00 ~a3.91 2067. rI Ii 2061.8~ u 1,50 ~9~0.03 Anchorage 818S.03 9.o0 315.08 r~02.~6 207~.~0 N 2073.79 # 1.50 E936.97 a2u.o~ ?.50 315.00 7s01.~3 ~o89.86, z003.~ ti 1.50 2951.32 ar~.o~ 6.00 3la.Or ~600.73 z09e. la If 2092.a ti 1.,0 ~9ea.o? mz~.o~ 4.50 31s.00 ~00.31 210~.66, 209e., ~ 1.50 ~r/~.2z asas.o~ 3.00 ~15.00 ~eoo.o9 ~109.~9, 2108.30 ~ 1.50 ~9~8.76 86~.03 1.so 31~.00 7900.01 ~118.07, 2106.00 u 8725.03 0.00 315.01 0000,00 ~113,00 N 2107.00 ti 1.50 29~,99 Emi AngLe urop .............. ' ....... 9000,00 0.00 315,00 827&.97. 2113.00 N ~107.00 ti 0.00 2903.99 ALL data is iff feet re&ess other, tar stated Vertical s~ti~ fa fr~ ~(l~ ~ azi~th 315.~ P~~ ~ h~ H~h~ INTEQ Oil Company ; 2-23-/)6 ;lO'16,1A/ ; tnchorat~ 307 276 7542;# 7/ 3 A/aska Oi/& Oas Cons. Commis~on ALI. data is in feet unless othee~lee stated CoeedJneteo rrm stot ri and TVD from l~e (100.00 Ft above mean oeo tevet). Verttcat section is frol I:mtcuimtton urine the mini~ curvature Method. Pr~e~ by laker Ik~tM IIdTEq .,~on Oil Company ; 2-23-~6 ;lO'16Al~t ; Anchorage~ ~07 276 7~42;# 8/ ~ 14eilured lncLtn. Azf.uth Tr~ Yert. DEoth Oegrffee Oegrm Dq~zJ~ PIKX~O~AL LISTING Page 1 Tear ref : Core. Ck FeCWl Vet.. ~1 L~t r~ll~: ~-F~ ~ ECTA N GU LA~ O~ Ve~ COOED I ~A T E SO~l~Ft ~c 0.00 0.0Q :515.08 0.00 1567.00 N 1573.00 Id 0.00 0.00 500.00 0.00 315.08 500.00 1567.00 Ii 1575.00 bi 0.00 .. 0.00 1000.00 0.00 315.08 1000,00 156T.00 # 1575.00 U 0.00 0.00 1198.74 0.00 315.08 1198.?& 1567.00 # 1573.00 g 0.00 12~8.?& ~,50 315.08 IL~gO.?1 15M.54 Il 13T4.54 I,I :).50 2.18 1399.?& 5.00 315.08 1398.&9 1573.18 # 157~.16 # 2.50 14~8.7& 7.50 $15.08 1&g7.88 1580.M N 15M.B& U 2.50 19.61 15~.7( 10.00 31S.M 15H.71 1591.66 Il 1597.58 Id 2.50 ~.~ 1699.7A 1Z,~O 315.08 169~,T~ 1605.47 Il 1611.~ g 2.50 5&.32 1798.74 15.00 315.08 1791.91 16Z~.30 ii 16~8.1& g 2.50 78.09 1~.7& 17,~0 ~15.~ 1~?.91 164~.11 II 16&?.~Og ~.$0 t06.01 1~.7& 20.00 315.~ 196~.$9 1644.87 Il 1670,59, # 2.~0 138.21 Z098. T& 2Z.50 315.08 Z0~.78 16~1.53 N 1696.18 V 2.50 174,46 Z198. T& 2~.00 315.0~ 216T.31 111~.D5 It 1~&.~3 V 2.S0 ;14.73 221~,74 :PT,50 315.08 2:;16.99 1750.37 Ii 1755,85 V 2.50 2398.74 30.00 315.08 Z3~.66 17'84.42 ii 1789.81 g 2.50 307.03 2&OO.OO 30.03 31].08 Z345.75 1784.~7 n 1790.~ Id :;.SO 3o?.68 2500.00 30.1/~ 315.08 2&32.32 1~.31 II 1825.59 g 0.08 357.72 ~000.00 30.03 315.08 ZMS,20 1~7.$0 Il Z002.28 t/ 0.00 3500.00 30.03 315.08 3298.0T ;1TG.70 M 217a. gl u o.O0 858.20 4eoo.oo 3D.03 315.08 $T30.~ Z351.~0 n Z355.6TV o.oo 11oa.~ 4500.00 30,03 31S.08 41g.aZ ~529.09 Ii Z55Z.36 g 0.00 5000.00 30.03 315.06 4596.70 2~06. Z9 , ZTQg. aS V O.O0 1608.91 SmX),O0 30.03 31S.Oe 5029.5? 2883.~9 N zees. Ts v o.oo Ia59.15 5706.10 30.03 315.M 5208.00 Z~56.52 II 2t~8.58bl 0.~ 1962.30 64300,00 30.03 315,08 5~,2.~5 3060,68 N 3062.M Id 0.08 2109.39 6500,00 30.03 315,08 5a95.32 3237.88 Il 333~.1& bl 0,00 ~59,63 6722.613 30,03 51S.08 6088.32. 3316.68 N 3317,91 g 0.00 2471.20 6725.03 30.00 315.08 ISG~O,I& ]317.63 N ~318,66 g 1.50 2&7~.25 6825.03 28,50 315.08 61TT.39 3352.23 Il 3353.16 bi 1.50 2521.11 61q9.03 27.00 315.08 62~.M 3385.20 N 33M.G5 tt 1.50 2567.67 T035.03 2S.SO $1S.08 6355.57 5416,51 N ~11.2~ g 1,50 2611,9Q 7129,03 24,00 31S.08 6446,38 Z~)LG. 16 Ii 34J~.~g 1.50 2653,76 7225.03 22.50 315.08 65~.26 34T~.11 N 3&T&.70 bi 1.50 2693.23 7325.03 21,00 315.08 M31.1& 3500.35 N 3500,M Id 1.50 2730.217 7&25,03 19,S0 315,08 67Z4.~5 352&.86 II 3525.30 ti 1.50 ZT64.90 7'J~.03 18.50 315.08 6819.64 35&7.62 N 3547.99 g 1,50 16~.03 16,50 315.08 6915,14 3568.~62 N 3568.93 g 1.50 25~S.70 T/25.G3 15,00 315.08 7011.3& 3587.84 N 3588.1014 1,50 2853,84 ~,03 13,50 315.08 7108.30 3605.21 Ii 3605.48 g 1.50 2878,&S 7V29.03 12.00. 31],08 7205.B( 3620.89 N 3621.06 kl 1,50 2~00.$2 80Z5,05 10.50 315.08 7303,91 363t).71 II ]~3/,.8& I~ 1.S0 2920.03 81~S.03 9.00 315.~ 7/d)2.~ 3646.70 Il 3646.19 I/ 1.50 29]6.97 8225.03 7,50 315.08 7501.~3 365&.86 Il 3656.92 I~ 1.50 29~1.32 a3~s.03 6.00 315.oa 7600,73 3~.1a M 3663.22 ti 1.50 2~4.0T 8qS.03 &.50 315,08 7700.31 3671.66 N 36T1.68 ti 8525.03 3.08 315,08 7500.09 3&7~.29 11 3676.30 ti M25.03 1.50 315.08 7900,01 367~.01 II ~679.08 ti 8T25.03 0.00 315.08 6000.00 36a0.00 II 3680.00 ti glX]O.O0 0.00 3t5.08 8ZT&,97 3680.00 i :~,gO.O0 bi EOC - 9 5/8" CSG Pt TARI~T #1 ~(n ~m~(e Dr~p Ct:lv _D FEB 2 1996 Oil & Gns ~ns. ~rrgn~ion ' ' ;~'""'"' ~'-:'~ 1.50 Z97Z,2Z 1.50 29]'8.76 1,50 21)82.68 AIL data fl In fe~t tmtese othffMise stated Coorcltrmte~ f~ SE Co~r of S~, 12, T1N, RI~ ~ T~ f~ RQ C100.00 Ft m K s, LML). V~ttcai s~t(m ia fr~ wtth~ ~ ezi~th 315.M ~. D~tl~ttm iS 0,00 ~, C~~e is '1,~ d~. Caiwtat~m wN the minf~ ~t~ m~. P~N ~ hhr ~fl INTEO -,~hon Oil Company ; 2-23-96 ;IO'17A~i ; Anchorage-, ~ . 907 276 7542;# 9/ /) ~THON Oft Ca,pm~ FI~FOUL LZST[IIG Page 2 CM"ei Creek FediriL #1 ,CCFIrl Tour' ref : Corea Ck Fedgl Verl. itl Expioratl~,Ctmn ~uttch, Ata~ka Heleured Znctln. Azimuth True Vert. R E C T A Ii G O L A R Dogleg Yert Depth O~grN~ Degree~ Del~h C 0 0 it D ! U A T £ $ Deg/lOOFt Sect ~raO0. O0 0.00 $15.08 877T.97 g7'~.03 0.00 315.08 IKXX),O0 ~dlO.O0 Ii 3680,00 ii 0.00, 2983.~ TI) / 7" C~G Pt CM.Ylinete. frmn SE Corner of See. 1~, T1N~ R13V ~ ~ f~ ~ C1~.~ Ft ~ ~en see leaL). P~~ W kkir ~ I~EQ Fora ~160--3 L4t=D I I .' 2 I ~ . L . H . i' UNITED STATES P. 02 DEPARTMENT OF THE INTERIOR -~. -.., o,...-.,,. ,'.,,,,, ,~-- BUREAU OF LAND MANAGEMENT ---- A _~~CATION FOR ~RMIT TO DRILL. DEEPEN. OR PLUG 6ACK ' ' ' ~ ' ~1. ~Vf~ Off WOB~ ll~l ~6Mi -- DRILL [] DEEPEN [~ b. Tffl el wtL~ P. ~ Box 19~198~ Aflcho~age~ ~ 99519-6~68 At fuhmce 1500' FSL & ~5~' F'~L of Sec. ~, TIN, E[3~, 5.~. · - [500' ~SL & [500' FEL of Sec. ~2. ~~s south 'of C~em ~u]ch ngnO,,,,,- re~.. L,., rL I5 O' f ' ~..,,t~.~i~ ..~.. ~.~,_." ~t I ~r:~ ' 899.4~ ~;~."' '" 't' .... ""' 6000' 9000'"O/9000'TVD PLUG ~olwI ~ JOUS]flK! Xal'l .... ~, WILL Jrt). " -- Corea Creek Federal #1 lO. ri~Lo sx~ PeeL. O~ WrL~e&T -- ~i ldcat/Tyoflek ~ 1. ~., v.. ~ u., o~ ~L=. -- est. 280' KB above MSL 10-16-95 PROPO3~D CASIXG AND C~MEN'TIh'O PROGIt&K ~i~l~t ............. .... ,, j -__ I 5~00 I534 sac,s ~-~/~ 7" ' 29 J 9~0' 1207 CONF DE AL iGHT HOLE D~]] ] ~n9 P~og~am, A~ea r,~ap, ~u~face Use P~ an, ~0PE and Choke ~an~fo]d sketches. Sec. 12, T1N,R13I~,$.FI. i'2.-CODa¥~ on J'aaMNj 13. l~&Zl Kena I AK OI CABL~' ~0LI -- preventer ~rofmm. If 4ny. I I i CHIEF, BITANCH~ I,,EA~ OPEF~TiC~S // ' :-IOV ~ I --95 ~EI) 1 I : 2 ! B.L.M. A ~'~¢h . Ak . FIN&~I 1ONX~'- NTAL · b--~E NT: H:K)P C~ ~ (DREA (REEK IEDERAL ~ Appendix A CONDITIONS OF APPROVAl, Corea Creek Federal # I. A COPY O]F THESE CONDITIONS SHALL BE FUR~~D TO YOUR FIELD REPRESENTATIVE TO ENSURE COMPLIANCE All lease and/or unit operations are to be conducted in such a manner that full compliance is made with the applicable laws, regulations (43 CFR 3160), applicable Onshore Orders and Notice-to-L~ssees (NTLs), the approved PERMIT TO DRILL, and apprm,ed Plan of Operations, State of Alaska's CZM Consistency Findings under State ID Number AIC930421.OSP(incorporated here by reference as attached), and U.S. Army Corps of Engineers Nationwide Permit Conditions (incorporated here by reference as attachments). The operator is considered fully responsible for the actions of their subcontractors. Thc following items are emphasized. 1. There shall be no dev/ation from the proposed drilling program as approved. Safe drilling and operating practices shall be observed. All wells, whether drilling, producing, suspended, or abandoned shall be identified in accordance with 43 CFR 3162.6. Any changes in operations must have prior approval of this office. 2. All shows of fresh water and minerals shall be report! and protected behind the casing. Oil and gas shows shall be adequately tested for oommemial possibilities, reported, and protected. 3. bio location shall be constructed or moved, no well shall be plugged, and no drilling equipment shall be removed imm a w~ll, which is to be placed in a SUSl~ndexl status, without prior approval of this office. If operations am to be suspended for more than 30 days, prior approval of this office must be obtained and notification given before resumption of operations. 4. In the ~'ent abandonment of the hole is desired, an oral request may be granted by this office, but must be timely followed, within I5 days, with a "Notice of Intention to Abandon" (Form No. 3160-:5). If at all possible, this office shall be notified at least 24 hours in advance to allow a representative to witness the operation. 5. The spud dat~ shall be reported ovally to this offie, e within 24 hours after spudding. the spudding occurs on a weekend or holiday, wait until the following regular wor~ to maim this report. ' If' I' I 0 '.,,' -- ~EI) i I : 22 B. L . M. A nc_.h . Ak . Fi'NAL'liVlION~NTAL ~SI~S~,ENT: I]~PCI~I~) (DREA (REEK ltEDE~L ~/1 Drilling progress r~ports shall be filed w~ldy to this office. If daily drilling reports are submitted by t¢le~x machine, w~kly reports will not b~ required. Our office Fax No. is 27'2-2249. IN ACCORDANCE WITH 43 CFR 3162.4-3, THE WELI, MUST BE REPORTED ON MMS FORM NO. 3160, "MONTHLY REPORT OF OPERATIONS," BEGINNING WITH THE MONTH IN WHICH DRILLING OPERATIONS COMMENCE AND CONT/NUE EACH MONTH U~ THE WELL IS PHYSICALLY PLUGGED AND ABANDONED. THIS I:LEI~Wr SHALL BE FII.ED WITH THE MINERAI~ MANAGEMENT SERVICE IN LAKEWOOD, COLORADO. 6. Any change in the program shall be approved by this office."Sundry Notices and ~rta on Wells" (Form No. 31f~}-3) shall be filed for all change of plans and other operations in ace. ordance with 43 CFR 3160 and Onshore Order No. 1. Emergency apprm~ may b~ obtained orally, but such approval docs not uraive the written report requirement. Any additional construction, reaonstruction, or alterations of facilities, roads, gathering line.% tank settings, ea'.., which will r~auit in new surface disturban~ will requir~ the filing of a suitable p}an pursuant to Onshore Order No. i and prior approval by both this offi~ and the I¢~nai National W'ddlife Refuge office.. 7. Whether the well is completed as a dry hole or as a producer, "Well Completion " and Recompletion l~port and Log" (Form No. 3160-4) shall be submitted ta this office within 30 days after the well is completed or abandoned. Two copies of all logs run (including sepia and magnetic tyl~), core descriptions, c, or~ analyses, w~ll t~st data, geologic automatic% Ixxxtuclng horizon(s) and formation(s) top summaries, sample descriptions, and all other surveys or da~ obtained and compiled during the drilling and/or completion Ol~rations shall also b~ submitted. 8. Ensure a minimum of 100 feet of overlap between the liner and the next larger casing. Thc interval of overlap shall be sealed and tested by fluid entry or pressure test. Test pressure shall b~ maximum anticipated pressure to which thc seal Mil be exposed. 9. All casing strings shall be pressure tested at (0.2 psi/fi., or 1,000 psi, whichever is greater) prior to drilling the plug after cementing; mst pr~ur~s must not exege, d the internal yield pressure, of the ~asing. If the pr~ssur~ declines more than 10 percent in 30 minutes, or if there are other indications of a leak, corr~tive measures must be taken. 10. BOPE shall b~ pressure tested at the time of installation, prior to drilling out each ca~ing shoe and after repairs to any BOPE equipment. Please notify our office as soon as practical of all BOPE t~st~ and r<ord each test in the drilling log. FINAL~VI ION~E NTAI. ~.S-'~SI~,E 1~'1': H:~OP('I~ I~ ({)REA {PEEK wr~RAL ~ · la addition, the BOPE shall be tes~ prior to any formation testing operations, unless the BOP£ has been tested within the last sev~ okays. Pipe and blind rams shall be activated each trip; however, this funclion need not be performed mom tt~an once per day. : Ram type pt'eveners and associated equipment shall be tested to approved stack working pressure, if isolated by test plug, or to 70 percent of internal yield pressure of casing if BOP stack is not isolated from casing. Pressure shall be maintained for at least 10 minutes. If a test plug is utitize~l, no bleed-off of pressure is acceptable. For a t~st not utilizing a test plug, if a decline in pressure of more than 10 percent in 30 minutes occurs, the test shall be considered to hav~ failed. Valve on casing head below test plug shall be open during the test of the BOP stack. Annular type prc~'enters shall be tested to 50 percent of rated working pressure. Pressure shall be maintained at least 10 minutes. A~umulator system shall maintain a pressure capacity reserve at alt times to provide for repeated operations of hydraulic preventers. A drilling string safety valve in the open position shall be maintained on the fig floor at ali times when drilling operations are being eonductM. Blo~uout prevention drills shall be conducted as neeessa~ to ensure that each drilling crew is properly trained to carry out emerg~ey duties. l 1. Minimum standards for all drilling ol~rations (ie., well control, casing and cementing, mud program, em) are contained in Onshore Order No. 2 and must be mci. 12. Undesirable events are subject to the requirements of NTL-3A. 13. I~afing of gas is subject to the requirements of NTI,-4^. 14. Our inspector shall be aliov~d access to the drilling site at all times, AlSo, our geologist shall be all~ access to the drilling site during the last week of drilling and during hole logging. Submit completion plans prior to initiating completion operations. 16. Submit a directional sur~j and final bottom hole location with the information requested in item blo. ? above. 17. All f~eml, state, and local Imrmits, regulations, and/or other conditions of approval shall be strictly adhered to. 16 IA E]~ 1 ! ~ 2 ~ B. L_. P1. A n c~ h . Ak . FINALlt¥11ONb~NTAL ,4iSESSI~ENT: I:ROPEIgI~ 03REA (REEK 1EDERAI,. /~ 1 $. Approval of this application does not warrant or certif7 that the applicant holds legal or equitable title to those rights in the subject lease which would entitle the applicant to conduct operations thereon. 19. Cuts of Mud samples will be made and provided to the BLM. Samples are required from the Beluga formation through all recognized strafigraphic formations to the total depth of the well. In addition, if any cores are taken, samples of' the core 'shall be provided to the BLM for petrographic examination. Copi¢s of any core analysis or other geq~hysical or g~-ochemica[ analyses conducted on well samples shall be provided to the BLM. 20. Copies of all v~i[ logs shall be provided to the BLM. If available we would prefer receiving both paper Icg copies and digital well logs compatible with Atlas Wircline Well Log 21. Copies of all other DSTs, production test data, or other well tests conducted during or after the drilling operation shall also be provided to the BLM. 22. A speed limit of 25 miles per hour will be posted and enforced on the access roads. 23. The access roa~s will be periodically sprayed with water to control dust, if needed. 24. The w~il bore will be plugged with cement as specified by frzh:ral and sram regulations, follmving its useful life or if lhe drilled well is not producible. 25. The affe.¢l~l area will be rehabilitated and reclaimed per spmification$ of the U.S. Bureau of Land Management and the Kenai Borough l.and Use Permit. Generally, all equipment and grawi will removed from thc site, thc disturbed area will be recontoured, and rev~getated. The Bureau of I.and Management will inspect the site for final abandon and reglamation. A ~ of thc final abandonment notice will tm sent to the Ymnai Borough as thc surfac~ management agency (SMA). Final abandonment shall not be approved until the surfac~ reclamation v~rk required by thc approved drilling permit or approved abandonment notice has been completed to the satisfaction of the SMA ( 43 CFR Part, 3160 Onshore oil and Gas Order No. i.) 26. The vehicle parking area will be lined with an impervious liner to contain spills, should any occur. 27. All work will be performed in accordance with the Oil Spill Contingency Plan, Environmental guidelines, Emergency Action Plan, and Safety Policies and Procedures, as set 1.7 I-.l 0 V -- ]. --9~ FINALli~ill)H~AL ~$1~$bEhT: ]ROP~ ti)REA (REEK libeRAL 28. All household and approved industrial garbage will be hauled to the Kenai P~ninsula Borough Sotdotna Landfill. 29. Sewage will be hauled to the Kr. nai sanitation facility. 30. Unused chemicals will be returned to the vendor who provided them. Eftbrts will be made to minimize the use of chemicals. 31. Muds a~d cuttings will be de,vatered on location. All liquids will be hauled to the water disposal facilities on Kenai Unit Pad 34-31 for.injection into Kenai Gas field WI3 #1, an approved disposal well (Alaska Oil and Oas Conservation Disposal Injection Order No. 4). Cuttings and solids will be ground and slurried and transported to Pad 41-18 for disposal into well KU 11-17, a class II disposal well an approved disposal site for exempt waste (Alaska Department of Environmental Conservation Permit #81-176). The rig contractor will be tequin~cl to provide an additional 1500 to 2000 barrels of reserve capacity steel pits ~'hile the rig is in operation. 32. Salts and brines used during the completion of Cores Creek Federal #1 will be hauled to the water disposal facilities on Pad 34-31 for injection into KU WD #1, an approved disposal well (Alaska Oil and Gas Conservation Commission Disposal Injection Order No. 4).. Pted~ wate~ obtained from ma'ting will be disposed of in the same manner. Bureau of Land Management State Office address and contacts are: Minerals Branch: ~'oseph A. ~ Chris Gibson 7:30 a.m.-4:00 p.m. (907) 267-1441 (907) 267-1450 1ee Russell (907) 267-1447 After hours and holidays: lee Russell (907) 248-3010 Joe Dygns (90T) 3384}052 home # Office Fax No.: (907) 267-1304 Address: Bureau ofland Management Anchorage District Office 6881 Abbott Loop Road Anchorage, Alaska 99507 b.l~l'~ 1 1 : '-'~ 5 ~B . L. M = A ~-~ ch . Ak . FINAi.liVIN3~I~NTAL ~i$[SS~ENT: I:ROP~ (DREA (REEK IEDERAL ~[ SUBJECT AND PERSONS/AGENCIES CONSULTED Proposed Alternative - Marathon Oil Co. Ali Surface Concerns - Bureau of Land Management. Solid and Liqaid Waste D~sposal - ADEC Other Stat~ of Alaska Concerns - Office of Coastal Zone Management and the Alaska Oil and Gas Conservation Commission Preparer(s): Jo~ph A. Dygas, Chief, Branch of Lease Opcmtions, BLM; Christopher Gibson, Geologist, BI.M, loc L. Russell, Petroleum Engineoring Technician, BLM left Denton, Wildlif~ Biologist and other District Resources Staff Dat~: October 30, 1995 NOV -- Decision P~cord EA No.: AK-040-95~ Operator: Mamthon_..~o. I.ease No.: A-O24399 Well Name/No.: ~~.,ek.['~dcraI #1 Location: $~fion 12, T. I lq., R. 13 W., SM 3 Mires south of Clam Gulch, (Near Fall Creek Gas Field), Kenai Borough, Alaska NEED FOR THE PROPOSED ACTION The action as described in the reference Application for Permit to drill is needed to further develop gas re,ryes on the above r~mnee lease. This lease was issued ~ the United States Govemmem' in 19:59 for the drilting of oil and gas wells by privat~ industry. Part of this lease is committod to the Falls Creek Unit that qualifies the lease to be held by production by the di.w.x~ery of gas in the Bali Creok unit # I well. These actions am in conformance with the lmm terms and conditions (attachments I & 2., APD conditions of approval and I~nai Land Un Permit). AI,TERNATIVF, S DISCUSSED Alternative A --Apprm, e the APD as submitted, with attaeh~ conditions of approval (see attachmenm gl & 2.) for the propos~ action. Alternative B --Deny the APD as submitted by the operator (no action). DECISION AND RATIONALE The decision is to ~lect Alternative A, to approve the application as submitted with attached eondifion~ of approval from the Corp~ of Engineers, and State of Alaska Coastal Zone Management, Kenai Borough Land Used Permit, Department of Environment Con~rvation, WaZr and Air Quality, and Private land owners, (attachment 1-4). FINDING OF NO SIGNIFICANT IMPACT (FONSI) Based on the assessment in the attached EA, i find that this action will not ha~ a significant impact on the human or natural environment or subsistence uses. Therefore, no Impact statement is necessary (NEPA, Section Ekv~ronmental Asse~ment No. AK-040-9S-001 No. A-0~4~99 Date October 30, ALASKA REGION DAILY DRILLING REPORT February 27, 1996 AKR/Kenai Peninsula/Kenai Gas Field/CCF-1 Development/Operator MARATHON W.I. 100.00% Objective: Drill and test a 9000' TVD Tyonek Test Dry Hole (Days) Total Cost (Days) Depth (MD) 24-hr Ftg AFE (6600695) $4,271,000 (40) $4,271,000 (40) Actual $ 617,893 (1) $ 617,893 (1) LAST CSG: LINER: SHOE TEST: NA MUD WT: 8.9 27 Feb: Accepted rig from mob at 0600 hrs 2-25-96. Mixed spud mud. Welded extension to drive pipe for flow line. R/U flowline and fillup line. Put rig back on mob at 2400 hrs to correct electrical and misc. problems. Accepted rig from mob at 1630 hfs 2-26-96. Tagged 35'. Spudded well at 1700 hrs. Control drilled from 35' to 327'. Circulated. Made short trip to shoe at 111'. Circulated. POOH. ORIGINAL ALASKA REGION DAILY DRILLING REPORT February 28, 1996 AKR/Kenai Peninsula/Kenai Gas Field/CCF-1 Development/Operator MARATHON W.I. 100.00% Objective: Drill and Test a 9000' TVD Tyonek Test Dry Hole (Days) Total Cost (Days) Depth (MD) 24-hr Ftg AFE (6600695) $2,896,000 (40) $4,271,000 (40) Actual $ 685,129 (2) $ 685,129 (2) LAST CSG: LINER-. SHOE TEST: NA MUD WT: 9.0 28 Feb: POOH. P/U 9 jts DP. R/U and run 13-3/8" casing to 327'. Circulated. Run stab in string and circulated. R/U and cemented casing with 280 SX of cement. POOH w/stab in string. Made cuts on 13-3/8" and 20" casing. Welded on slip on wellhead and tested same. N/U diverter system. ALASKA REGION DAILY DRILLING REPORT February 29, 1996 AKR/Kenai Peninsula/Corea Creek Federal #1 Exploration/Operator MARATHON W.I. 100.00% Objective: Drill and Test a 9000' TVD Tyonek Test Dry Hole (Days) Total Cost (Days) Depth (MD) 24-hr Ftg AFE (6600695) $2,896,000 (40) $4,271,000 (40) Actual $ 710,820 (3) $ 710,820 (3) LAST CSG: LINER: SHOE TEST: NA MUD WT: 8.6 29 Feb: R/U diverter system, bell nipple and flowline. Function tested diverter and tested accumulator. L/D drill pipe and BHA from derrick. ALASKA REGION DAILY DRILLING REPORT March 1, 1996 AKR/Kenai Peninsula/Corea Creek Federal #1 Exploration/Operator MARATHON W.I. 100.00% Objective: Drill and Test a 9000' TVD Tyonek Test Dry Hole (Days) Total Cost (Days) Depth (MD) 24-hr Ftg AFE (6600695) $2,896,000 (40) $4,271,000 (40) Actual $ 765,239 (4) $ 765,239 (4) LAST CSG: LINER: SHOE TEST: NA MUD WT: 8.7 01 Mar: Finished L/D Pipe from derrick. M/U directional B~A. Repaired SCR. CBU. Drilled cement and float equipment 321' to 327'. CBU. Drilled and surveyed from 327' to 1280'. ALASKA REGION DAILY DRILLING REPORT March 4, 1996 AKR/Kenai Peninsula/Corea Creek Federal #1 Exploration/Operator MARATHON W.I. 100.00% Objective: Drill and Test a 9000' TVD Tyonek Test AFE (6600695) Actual Dry Hole (Days) $2,896,000 (40) $ 920,295 (7) Total Cost (Days) Depth (MD) 24-hr Ftg $4,271,000 (40) $ 920,295 (7) LAST CSG: LINER: SHOE TEST: NA MUD WT: 9.6 02 Mar: 03 Mar: 04 Mar: Drilled from 1280' to 1503'. CBU. Made wiper trip to shoe. Drilled from 1503' to 2137'. Drilled and surveyed from 2137' to 2507'. Repaired mud pump. Drilled to 2585'. CBU. Wiper trip. Finished wiper trip to 1101'. CBU. POOH. L/D directional tools. R/U to log. RIH. Could not get past 2118'. Logged to shoe with SP DITE LDT CNL. POOH and R/D. RIH and tagged up at 2118'. Reamed from 2118' to 2585' CBU. Wiper trip to 2075'. CBU. POOH. R/U to log. RIH ~ith SP Dite LDT CNL. Logged from 2585' to 2118'. POOH. ALASKA REGION DAILY DRILLING REPORT March 5, 1996 AKR/Kenai Peninsula/Corea Creek Federal #1 Exploration/Operator MARATHON W.I. 100.00% Objective: Drill and Test a 9000' TVD Tyonek Test Dry Hole (Days) Total Cost (Days) Depth (MD) 24-hr Ftg AFE (6600695) $2,896,000 (29) $4,271,000 (40) Actual $ 957,728 (8) $ 957,728 (8) LAST CSG: LINER: SHOE TEST: NA MUD WT: 9.5 05 Mar: Finished logging. Made conditioning trip. Started running 9-5/8" casing. ALASKA REGION DAILY DRILLING REPORT March 6, 1996 AKR/Kenai Peninsula/Corea Creek Federal #1 Exploration/Operator MARATHON W.I. 100.00% Objective: Drill and Test a 9000' TVD Tyonek Test Dry Hole (Days) Total Cost (Days) Depth (MD) 24-hr Ftg AFE (6600695) $2,896,000 (29) $4,271,000 (40) Actual $1,046,641 (9) $1,046,641 (9) LAST CSG: LINER'. SHOE TEST: NA MUD WT: 9.7 06 Mar: Ran 9-5/8" casing. Repaired flowline. Finished running casing with shoe at 2563'. Circulated and conditioned mud. Ran stab in cementing string. Cemented with 700 SKS (185 BBLS) lead and 270 SKS (56 BBLS) of tail. Pulled stab in string. R/D stab in string running tools and casing tools. Cleaned cellar area. Started N/D diverter. ALASKA REGION DAILY DRILLING REPORT March 7, 1996 AKR/Kenai Peninsula/Corea Creek Federal #1 Exploration/Operator MARATHON W.I. 100.00% Objective: Drill and Test a 9000' TVD Tyonek Test Dry Hole (Days) Total Cost (Days) Depth (MD) 24-hr Ftg AFE (6600695) $2,896,000 (29) $4,271,000 (40) Actual $1,087,914 (10) $1,087,914 (10) LAST CSG: LINER: SHOE TEST: NA MUD WT: 9.7 07 Mar: Finish N/D diverter system. P/U diverter, set slips. Made rough cut. N/D diverter. Made final cut. N/U casing spool and tested same. N/U BOP's. ALASKA REGION DAILY DRILLING REPORT March 8, 1996 AKR/Kenai Peninsula/Corea Creek Federal #1 Exploration/Operator MARATHON W.I. 100.00% Objective: Drill and Test a 9000' TVD Tyonek Test Dry Hole (Days) Total Cost (Days) Depth (MD) 24-hr Ftg AFE (6600695) $2,896,000 (29) $4,271,000 (40) Actual $1,121,603 (11) $1,121,603 (11) LAST CSG: LINER: SHOE TEST: NA MUD WT: 9.7 08 Mar-. Finished N/U BOP's and lines. Tested BOP's. L/D 12 stds of DP from derrick. M/U 8-1/2" BHA. RIH to 2283'. Started taking WT. Washed from 2283' to 2415'. ALASKA REGION DAILY DRILLING REPORT March 11, 1996 AKR/Kenai Peninsula/Corea Creek Federal #1 Exploration/Operator MARATHON W.I. 100.00% Objective: Drill and Test a 9000' TVD Tyonek Test Dry Hole (Days) Total Cost (Days) Depth (MD) 24-hr Ftg AFE (6600695) $2,896,000 (29) $4,271,000 (40) Actual $1,281,864 (14) $1,281,864 (14) LAST CSG: 9-5/8" @ 2563 LINER: SHOE TEST: 13.1 MUD WT: 9.6 9 Mar: 10 Mar: 11 Mar: Washed from 2415' to 2462'. Tagged cement. Circulated. Tested casing to 2000 psi. Drilled cement, float collar, float shoe and 5' of formation to 2590'. Circulated. Tested shoe to 13.1 PPG EMW. Drilled from 2590' to 2818'. CBU. POOH. Had to pump out last 6 joints. RIH to 2818'. CBU. POOH to 2530'. Pumped spud mud from active pits. Cleaned pits. Started mixing polymer mud. Mixed up 675 BBLS polymer mUd and spacer pills. Displaced mud with pills and polymer mud. Drilled from 2818' to 3156'. Drilled from 3156' to 3341' Circulated. POOH. Had to pump out 15 jts to get to shoe. ~irc and pump dry job. POOH. M/U mud motor and bit. RIH to 2800'. Washed 2800' to 3341'. Drilled from 3341' to 3576'. ALASKA REGION DAILY DRILLING REPORT March 12, 1996 AKR/Kenai Peninsula/Corea Creek Federal #1 Exploration/Operator MARATHON W.I. 100.00% Objective: Drill and Test a 9000' TVD Tyonek Test Dry Hole (Days) Total Cost (Days) Depth (MD) 24-hr Ftg AFE (6600695) $2,896,000 (29) $4,271,000 (40) Actual $1,332,466 (15) $1,332,466 (15) LAST CSG: 9-5/8" @ 2563 LINER: SHOE TEST: 13.1 MUD WT: 10.1 12 Mar: Drilled from 3576' to 3855'. CBU. Made 7 STD short ~rip. Drilled from 3855' to 4410'. CBU. POOH to shoe for short trip. ALASKA REGION DAILY DRILLING REPORT March 13, 1996 AKR/Kenai Peninsula/Corea Creek Federal #1 Exploration/Operator MARATHON W.I. 100.00% Objective: Drill and Test a 9000' TVD Tyonek Test Dry Hole (Days) Total Cost (Days) Depth (MD) 24-hr Ftg AFE (6600695) $2,896,000 (29) $4,271,000 (40) Actual $1,377,055 (16) $1,377,055 (16) LAST CSG: 9-5/8" @ 2563 LINER: SHOE TEST: 13.1 MUD WT: 10.0 13 Mar: RIH to 4410'. Drilled from 4410' to 4967'. CBU. Made 7 STD short trip. Drilled from 4967' to 5202'. ALASKA REGION DAILY DRILLING REPORT March 14, 1996 AKR/Kenai Peninsula/Corea Creek Federal #1 Exploration/Operator MARATHON W.I. 100.00% Objective: Drill and Test a 9000' TVD Tyonek Test AFE (6600695) Actual Dry Hole (Days) $2,896,000 (29) $1,422,718 (17) Total Cost (Days) Depth (MD) 24-hr Ftg $4,271,000 (40) $1,422,718 (17) LAST CSG: 9-5/8" @ 2563 LINER: SHOE TEST: 13.1 MUD WT: 10.0 14 Mar: Drilled from 5202' to 5246'. CBU. POOH. L/D motor. TeSted BOPE. M/U packed drilling assembly. RIH to shoe. Slipped and cut drill line. RIH to 5246'. CBU. Drilled from 5246' to 5376'. ALASKA REGION DAILY DRILLING REPORT March 15, 1996 AKR/Kenai Peninsula/Corea Creek Federal #1 Exploration/Operator MARATHON W.I. 100.00% Objective: Drill and Test a 9000' TVD Tyonek Test Dry Hole (Days) Total Cost (Days) Depth (MD) 24-hr Ftg AFE (6600695) $2,896,000 (29) $4,271,000 (40) 5825' 449' Actual $1,466,657 (18) $1,466,657 (18) LAST CSG: 9-5/8" @ 2563 LINER: SHOE TEST: 13.1 MUD WT: 10.0 15 Mar: Drilled from 5376' to 5825'. CBU. Made wiper trip to 5066'. CBU. POOH for core barrel. ALASKA REGION DAILY DRILLING REPORT March 18, 1996 AKR/Kenai Peninsula/Corea Creek Federal #1 Exploration/Operator MARATHON W.I. 100.00% Objective: Drill and Test a 9000' TVD Tyonek Test AFE (6600695) Actual Dry Hole (Days) $2,896,000 (29) $1,607,721 (21) Total Cost (Days) Depth (MD) 24-hr Ftg $4,271,000 (40) 6660' 835' $1,607,721 (21) LAST CSG: 9-5/8" @ 2563 LINER: SHOE TEST: 13.1 MUD WT: 10.2 16 Mar: 17 Mar: 18 Mar: L/D directional tools. P/U coring assembly. CBU. Cored from 5825' to 5873'. RIH to 5825'. Cored from 5873' to 5885'. CBU. POOH. L/D coring equipment. Recovered 45' of core. P/U directional BHA. RIH to 5825'. Reamed to 5885'. Drilled from 5885' to 6128'. Drilled from 6128' to 6468'. CBU. Made wiper trip to 5531'. Drilled to 6660'. ALASKA REGION DAILY DRILLING REPORT March 19, 1996 AKR/Kenai Peninsula/Corea Creek Federal #1 Exploration/Operator MARATHON W.I. 100.00% Objective: Drill and Test a 9000' TVD Tyonek Test Dry Hole (Days) Total Cost (Days) Depth (MD) 24-hr Ftg AFE (6600695) $2,896,000 (29) $4,271,000 (40) 7055' 395' Actual $1,646,651 (22) $1,646,651 (22) LAST CSG: 9-5/8" @ 2563 LINER: SHOE TEST: 13.1 MUD WT: 10.1 19 Mar: Drilled from 6660' to 6837'. CBU. Made wiper trip to 6274'. Drilled to 7055'. Circulated and conditioned mud. POOH. ALASKA REGION DAILY DRILLING REPORT March 20, 1996 AKR/Kenai Peninsula/Corea Creek Federal #1 Exploration/Operator MARATHON W.I. 100.00% Objective: Drill and Test a 9000' TVD Tyonek Test Dry Hole (Days) Total Cost (Days) Depth (MD) 24-hr Ftg AFE (6600695) $2,896,000 (29) $4,271,000 (40) 7336' 281' Actual $1,689,584 (23) $1,689,584 (23) LAST CSG: 9-5/8" @ 2563 LINER: SHOE TEST: 13.1 MUD WT: 10.4 20 Mar: POOH. L/D MWD. P/U motor and new MWD. RIH to shoe. Repaired SCR system. RIH to 7003'. Reamed to 7055'. Drilled from 7055' to 7336'. ALASKA REGION DAILY DRILLING REPORT March 21, 1996 AKR/Kenai Peninsula/Corea Creek Federal #1 Exploration/Operator MARATHON W.I. 100.00% Objective: Drill and Test a 9000' TVD Tyonek Test Dry Hole (Days) Total Cost (Days) Depth (MD) 24-hr Ftg AFE (6600695) $2,896,000 (29) $4,271,000 (40) 7518' 182' Actual $1,741,221 (24) $1,741,221 (24) LAST CSG: 9-5/8" @ 2563 LINER: SHOE TEST: 13.1 MUD WT: 10.2 21 Mar: Drilled from 7336' to 7413'. Worked on SCR problems. Driiled from 7413' to 7518'. CBU. Made 10 std short trip. Mud motor stalling out, unable to drill. POOH. Left all three cones in hole. Pull wear bushing. Set test plug to test BOP's. ALASKA REGION DAILY DRILLING REPORT March 22, 1996 AKR/Kenai Peninsula/Corea Creek Federal #1 Exploration/Operator MARATHON W.I. 100.00% Objective: Drill and Test a 9000' TVD Tyonek Test Dry Hole (Days) Total Cost (Days) Depth (MD) 24-hr Ftg AFE (6600695) $2,896,000 (29) $4,271,000 (40) 7523' 5' Actual $1,773,057 (25) $1,773,057 (25) LAST CSG: 9-5/8" @ 2563 LINER: SHOE TEST: 13.1 MUD WT: 10.4 22 Mar: Tested BOP's. M/U reverse circulating basket and RIH. Milled on cones and cut core from 7518' to 7521'. POOH. No recovery. M/U bladed mill and RIH. Milled on junk from 7519' to 7523'. ALASKA REGION DAILY DRILLING REPORT March 25, 1996 AKR/Kenai Peninsula/Corea Creek Federal #1 Exploration/Operator MARATHON W.I. 100.00% Objective: Drill and Test a 9000' TVD Tyonek Test Dry Hole (Days) Total Cost (Days) Depth (MD) 24-hr Ftg AFE (6600695) $2,896,000 (29) $4,271,000 (40) 7908' 385' Actual $1,900,127 (28) $1,900,127 (28) LAST CSG: 9-5/8" @ 2563 LINER. · SHOE TEST: 13.1 MUD WT: 10.3 23 Mar: 24 Mar: 25 Mar: Milled from 7523' to 7528'. Mill quit torqueing up. pOoH. Mill 70% worn and 1/2" undergauge. Recovered 1 cup or iron in boot baskets. Make up mill #2 and RIH. Reamed 7525' to 7528'. Milled 7528' to 7531'. Milled on junk at 7531'. POOH. Recovered one cup or iron in boot baskets. Mill 80% worn and wad pattern of milling up cone. P/U bit #9 and BHA. RIH. Washed 7489' to 7531'. Drilled from 7531' to 7656'. Drilled from 7656' to 7665'. CBU. POOH. P/U new bit and mud motor. RIH. Drilled from 7665' to 7908'. ALASKA REGION DAILY DRILLING REPORT March 26, 1996 AKR/Kenai Peninsula/Corea Creek Federal #1 Exploration/Operator MARATHON W.I. 100.00% Objective: Drill and Test a 9000' TVD Tyonek Test Dry Hole (Days) Total Cost (Days) Depth (MD) 24-hr Ftg AFE (6600695) $2,896,000 (29) $4,271,000 (40) 8155' 247' Actual $1,942,440 (29) $1,942,440 (29) LAST CSG: 9-5/8" @ 2563 LINER: SHOE TEST: 13.1 MUD WT: 10.3 26 Mar: Drilled from 7908' to 8151'. CBU. Evaluated cuttings. Drilled from 8151' to 8155'. CBU. Evaluated cuttings. Made short trip to 7245'. CBU. POOH for core barrel. ALASKA REGION DAILY DRILLING REPORT March 27, 1996 AKR/Kenai Peninsula/Corea Creek Federal #1 Exploration/Operator MARATHON W.I. 100.00% Objective: Drill and Test a 9000' TVD Tyonek Test Dry Hole (Days) Total Cost (Days) Depth (MD) 24-hr Ftg AFE (6600695) $2,896,000 (29) $4,271,000 (40) 8215' 60' Actual $1,972,649 (30) $1,972,649 (30) LAST CSG: 9-5/8" @ 2563 LINER: SHOE TEST: 13.1 MUD WT: 10.3 27 Mar-. Finished POOH. P/U coring assembly and RIH to 8110'. Reamed 8110' to 8155'. CBU. Cored from 8155' to 8215'. CBU. POOH. ALASKA REGION DAILY DRILLING REPORT March 28, 1996 AKR/Kenai Peninsula/Corea Creek Federal #1 Exploration/Operator MARATHON W.I. 100.00% Objective: Drill and Test a 9000' TVD Tyonek Test Dry Hole (Days) Total Cost (Days) Depth (MD) 24-hr Ftg AFE (6600695) $2,896,000 (29) $4,271,000 (40) 8578' 363' Actual $2,018,255 (31) $2,018,255 (31) LAST CSG: 9-5/8" @ 2563 LINER. · SHOE TEST: 13.1 MUD WT: 10.3 28 Mar: POOH. L/D core. Tested BOPE. P/U directional BHAand RIH to 8142'. Reamed from 8142' to 8215'. Drilled from 8215' to 8578'. ALASKA REGION DAILY DRILLING REPORT March 29, 1996 AKR/Kenai Peninsula/Corea Creek Federal #1 Exploration/Operator MARATHON W.I. 100.00% Objective: Drill and Test a 9000' TVD Tyonek Test Dry Hole (Days) Total Cost (Days) Depth (MD) 24-hr Ftg AFE (6600695) $2,896,000 (29) $4,271,000 (40) 9017' 439' Actual $2,059,085 (32) $2,059,085 (32) LAST CSG: 9-5/8" @ 2563 LINER: SHOE TEST: 13.1 MUD WT: 10.4 29 Mar: Drilled from 8578' to 8740'. CBU. Drilled to 9017'. CBU. POOH. BHA. Wiper trip to 7965'. ALASKA REGION DAILY DRILLING REPORT April 1, 1996 AKR/Kenai Peninsula/Corea Creek Federal #1 Exploration/Operator MARATHON W.I. 100.00% Objective: Drill and Test a 9000' TVD Tyonek Test Dry Hole (Days) Total Cost (Days) Depth (MD) 24-hr Ftg AFE (6600695) $2,896,000 (29) $4,271,000 (40) 9707' 690' Actual $2,201,052 (35) $2,201,052 (35) LAST CSG: 9-5/8" @ 2563 LINER: SHOE TEST: 13.1 MUD WT: 10.8 30 Mar: 31 Mar: 1 Apr: L/D directional BHA and P/U rotary drilling assembly. Rim to shoe. Slipped and cut drill line. RIH to 8985'. Reamed to 9017'. Drilled from 9017' to 9300'. Drilled from 9300' to 9365'. CBU. Wiper trip to 8395'. Drilled from 9365' to 9528'. CBU and dropped survey. POOH. POOH. BHA. M/U new bit. RIH to 9418'. Reamed to 9528'. Drilled from 9528' to 9707'. ALASKA REGION DAILY DRILLING REPORT April 2, 1996 AKR/Kenai Peninsula/Corea Creek Federal #1 Exploration/Operator MARATHON W.I. 100.00% Objective: Drill and Test a 9000' TVD Tyonek Test Dry Hole (Days) Total Cost (Days) Depth (MD) 24-hr Ftg AFE (6600695) $2,896,000 (29) $4,271,000 (40) 9738' 31' Actual $2,231,886 (36) $2,231,886 (36) LAST CSG: 9-5/8" @ 2563 LINER: SHOE TEST: 13.1 MUD WT: 10.7 2 Apr: Drilled from 9707' to 9738'. CBU. Made wiper trip to 7838'. CBU. POOH. Hole tight from 7374' to 6169'. BHA. Retrieved survey. L/D monels and P/U reaming assembly. RIH to shoe. Slipped and cut drill line. RIH. ALASKA REGION DAILY DRILLING REPORT April 3, 1996 AKR/Kenai Peninsula/Corea Creek Federal #1 Exploration/Operator MARATHON W.I. 100.00% Objective: Drill and Test a 9000' TVD Tyonek Test Dry Hole (Days) Total Cost (Days) Depth (MD) 24-hr Ftg AFE (6600695) $2,896,000 (29) $4,271,000 (40) 9738' Actual $2,276,391 (37) $2,276,391 (37) LAST CSG: 9-5/8" @ 2563 LINER: SHOE TEST: 13.1 MUD WT: 10.9 3 Apr: RIH to 7433'. Circulated hole clean. RIH. Reamed bridge and tight hole from 7496' to 7660'. RIH to 9475'. Reamed to 9738'. Circulated hole clean and conditioned mud for logging. POOH. BHA. R/U to log. ALASKA REGION DAILY DRILLING REPORT April 4, 1996 AKR/Kenai Peninsula/Corea Creek Federal #1 Exploration/Operator MARATHON W.I. 100.00% Objective: Drill and Test a 9000' TVD Tyonek Test Dry Hole (Days) Total Cost (Days) Depth (MD) 24-hr Ftg AFE (6600695) $2,896,000 (29) $4,271,000 (40) 9738' Actual $2,351,738 (38) $2,351,738 (38) LAST CSG: 9-5/8" @ 2563 LINER: SHOE TEST: 13.1 MUD WT: 10.7 4 Apr: M/U and RIH with resistivity sonic log to 9720'. Logged 'from 9720' to 2563'. POOH. L/D tools. M/U and RIH with density neutron to 9720'. Logged from 9720' to 2563'. POOH. L/D tool. R/D E line. Pulled wear bushing. Set test plug. Started testing BOP's. ALASKA REGION DAILY DRILLING REPORT April 8, 1996 AKR/Kenai Peninsula/Corea Creek Federal #1 Exploration/Operator MARATHON W.I. 100.00% Objective: Drill and Test a 9000' TVD Tyonek Test Dry Hole (Days) Total Cost (Days) Depth (MD) 24-hr Ftg AFE (6600695) $2,896,000 (29) $4,271,000 (40) 9738' Actual $2,673,952 (42) $2,673,952 (42) LAST CSG: 9-5/8" @ 2563 LINER: SHOE TEST: 13.1 MUD WT: 10.8 5 Apr: 6 Apr: 7 Apr: 8 Apr: Finished testing BOPS. RIH to 9738'. Circulated and conditioned mud. POOH. R/U E line. RIH with dipmeter to 9500'. AMS quit working. POOH and changed out same. RIH w/dipmeter to 9720' and started logging. Finished logging with dipmeter from 6200' to 2563'. P/U CMR/GR and RIH to 9600'. Tool stuck at 9017' while attempting to calibrate. R/U to strip over wireline, P/U jars and overshot. RIH stripping over wireline to 7634'. Tool came free. Circulated. Pulled tool into overshot. R/U and pulled out of ropesocket. POOH with wireline. POOH w/drill pipe. L/D fish, full recovery of logging tools. L/D fishing tools. M/U BHA and RIH to 9735'. Circulated and conditioned mud. POOH to run casing. L/D BHA. casing. Changed rams to 7'. R/U and run 7" production ALASKA REGION DAILY DRILLING REPORT April 9, 1996 AKR/Kenai Peninsula/Corea Creek Federal #1 Exploration/Operator MARATHON W.I. 100.00% Objective: Drill and Test a 9000' TVD Tyonek Test Dry Hole (Days) Total Cost (Days) Depth (MD) 24-hr Ftg AFE (6600695) $2,896,000 (29) $4,271,000 (40) 9688' Actual $2,767,447 (43) $2,767,447 (43) LAST CSG: 9-5/8" @ 2563 LINER: SHOE TEST: 13.1 MUD WT: 10.7 9 Apr: Finished running 7" production casing. Circulated and conditioned mud. Cemented first stage with 550 SX cement. Circulated and conditioned mud. Cemented second stage with 650 SX cement. Started nippling down BOP stack. ALASKA REGION DAILY DRILLING REPORT April 10, 1996 AKR/Kenai Peninsula/Corea Creek Federal #1 Exploration/Operator MARATHON W.I. 100.00% Objective: Drill and Test a 9000' TVD Tyonek Test Dry Hole (Days) Total Cost (Days) Depth (MD) 24-hr Ftg AFE (6600695) $2,896,000 (29) $4,271,000 (40) 9688' Actual $2,791,375 (44) $2,791,375 (44) LAST CSG: 9-5/8" @ 2563 LINER: SHOE TEST: 13.1 MUD WT: 10.7 10 Apr: N/D BOP's. Set casing slips. Made rough and final cuts. Installed tubing spool and tested same. N/U BOP's and lines. Tested BOP's. Started laying down 5" DP. ALASKA REGION DAILY DRILLING REPORT April 11, 1996 AKR/Kenai Peninsula/Corea Creek Federal #1 Exploration/Operator MARATHON W.I. 100.00% Objective: Drill and Test a 9000' TVD Tyonek Test Dry Hole (Days) Total Cost (Days) Depth (MD) 24-hr Ftg AFE (6600695) $2,896,000 (29) $4,271,000 (40) 9688' Actual $2,816,793 (45) $2,816,793 (45) LAST CSG: 9-5/8" @ 2563 LINER: SHOE TEST: 13.1 MUD WT: 10.7 11 Apr: L/D 5" drill pipe from derrick. L/D Kelly. P/U 3-1/2" Kelly. Tested Kelly and Kelly valves to 250/5000 psi. P/U BHA. RIH P/U 3-1/2" drill pipe. ALASKA REGION DAILY DRILLING REPORT April 12, 1996 AKR/Kenai Peninsula/Corea Creek Federal #1 Exploration/Operator MARATHON W.I. 100.00% Objective: Drill and Test a 9000' TVD Tyonek Test Dry Hole (Days) Total Cost (Days) Depth (MD) 24-hr Ftg AFE (6600695) $2,896,000 (29) $4,271,000 (40) 9688' Actual $2,846,418 (46) $2,846,418 (46) LAST CSG: 9-5/8" @ 2563 LINER: SHOE TEST: 13.1 MUD WT: 10.7 12 Apr: RIH P/U drill pipe to 6930'. Drilled stage collar from 6930' to 6933'. CBU. RIH P/U drill pipe to 9591'. CBU. Tested casing to 3500 psi. Bled to 2600 psi. POOH. Set retainer on E line at 9571' WLM. R/D E line. ALASKA REGION DAILY DRILLING REPORT April 15, 1996 AKR/Kenai Peninsula/Corea Creek Federal #1 Exploration/Operator MARATHON W.I. 100.00% Objective: Drill and Test a 9000' TVD Tyonek Test AFE (6600695) Actual Dry Hole (Days) $2,896,000 (29) $3,047,000 (49) Total Cost (Days) Depth (MD) 24-hr Ftg $4,271,000 (40) 9588' $3,047,000 (49) LAST CSG: 9-5/8" @ 2563 LINER. · SHOE TEST: 13.1 MUD WT: 10.5 13 Apr: 14 Apr: 15 Apr: Tested casing to 3500 psi. R/U and ran CET/CBT from 9575' to 2300'. RIH with BHA to displace 300' 'of mud for VSP. POOH. R/U and RIH with VSP taking check shots. Finished running VSP log. Ran repeat CET/CBT from 6000' to 5000'. POOH and R/D. Ran in hole with retainer setting tool. Tagged retainer at 9588'. CBU. CBU. R/U to cement. Squeezed shoe through retainer at 9588' with 30 bbls of cement. Reversed out. POOH. Ran CET/CBT from 9490' to 8890'. RIH and shot squeeze perfs from 9302' to 9304'' RIH with retainer. Attempted to set at 9280'' POOH. Check setting tool. RIH with retainer. ALASKA REGION DAILY DRILLING REPORT April 16, 1996 AKR/Kenai Peninsula/Corea Creek Federal #1 Exploration/Operator MARATHON W.I. 100.00% Objective: Drill and Test a 9000' TVD Tyonek Test Dry Hole (Days) Total Cost (Days) Depth (MD) 24-hr Ftg AFE (6600695) $2,896,000 (29) $4,271,000 (40) 9588' Actual $3,096,723 (50) $3,096,723 (50) LAST CSG: 9-5/8" @ 2563 LINER: SHOE TEST: 13.1 MUD'WT: 10.6 16 Apr-. RIH with retainer on E line. Set retainer at 9288' WLM. POOH and R/D. RIH with retainer running tool on DP. Tagged retainer at 9298' DPM. Squeezed with 20 bbls of 15.8 ppg cement. Reversed out. POOH. P/U bit and junk basket. RIH to 9288'. Circulated and WOC. ALASKA REGION DAILY DRILLING REPORT April 17, 1996 AKR/Kenai Peninsula/Corea Creek Federal #1 Exploration/Operator MARATHON W.I. 100.00% Objective: Drill and Test a 9000' TVD Tyonek Test Dry Hole (Days) Total Cost (Days) Depth (MD) 24-hr Ftg AFE (6600695) $2,896,000 (29) $4,271,000 (40) 9588' Actual $2,505,047 (41) $3,118,650 (51) LAST CSG: 9-5/8" @ 2563 LINER: SHOE TEST: 13.1 MUD WT: 10,.5 17 Apr: Circulated and WOC. Drilled retainer and cement from 929~' to 9320'. Chased retainer junk to 9580'. CBU. Tested casing to 2000 psi. Pumped slug. POOH. L/D junk basket and P/U scraper. RIH to 9580'. R/U to circulate. ALASKA REGION DAILY DRILLING REPORT April 18, 1996 AKR/Kenai Peninsula/Corea Creek Federal #1 Exploration/Operator MARATHON W.I. 100.00% Objective: Drill and Test a 9000' TVD Tyonek Test Dry Hole (Days) Total Cost (Days) Depth (MD) 24-hr Ftg AFE (6600695) $2,896,000 (29) $4,271,000 (40) 9588' Actual $2,657,547 (41) $3,306,572 (52) LAST CSG: 9-5/8" @ 2563 LINER: SHOE TEST: 13.1 MUD WT: 8.5 18 Apr: Pumped down surface volume. Cleaned pits. Displaced mud in hole w/fresh water. Displaced water with 3% KCL. POOH. L/D drill pipe. ALASKA REGION DAILY DRILLING REPORT April 19, 1996 AKR/Kenai Peninsula/Corea Creek Federal #1 Exploration/Operator MARATHON W.I. 100.00% Objective: Drill and Test a 9000' TVD Tyonek Test Dry Hole (Days) Total Cost (Days) Depth (MD) 24-hr Ftg AFE (6600695) $2,896,000 (29) $4,271,000 (40) 9588' Actual $2,657,547 (41) $3,337,123 (53) LAST CSG: 9-5/8" @ 2563 LINER: SHOE TEST: 13.1 MUD WT: 8.5 19 Apr-. POOH laying down drill pipe, heavy wt, and drill collars. R/U and started running production tubing. ALASKA REGION DAILY DRILLING REPORT April 22, 1996 AKR/Kenai Peninsula/Corea Creek Federal #1 Exploration/Operator MARATHON W.I. 100.00% Objective: Drill and Test a 9000' TVD Tyonek Test Dry Hole (Days) Total Cost (Days) Depth (MD) 24-hr Ftg AFE' (6600695) $2,896,000 (29) $4,271,000 (40) 9588' Actual $2,657,547 (41) $3,602,737 (55) LAST CSG: 9-5/8" @ 2563 LINER: SHOE TEST: 13.1 MUD WT: 8.5 20 Apr- · 21 Apr: Finished running production tubing. Circulated and inhibited 3% KCL. Set packer. Tested packer. L/D landing joint, set BPV. Prep to N/D BOP's. N/D BOP's. N/U tree and tested same to 5000 psi. Released rig to demob at 1300 hrs 4-20-96. Final Report. CORE DATA M CROi: LMED i ' PETROLEUM SERVICES CORE PHOTOGRAPHS MARATHON OIL CO. COREA CREEK #1 FALLS CREEK FIELD KENAI, ALASKA CORE 1 5825.0 - 5872 . 2 HOL ,~.... ;,.~,? ,%., Core Laboratories, Inc. 3430 Unicorn Road. Bakersfield, California 93308, (805) 392-8600. Fax (805) 392-0824 merit by Marathon. 5872.2 CORE PHOTO~P~PHS COREA CREEK #1 CORE 2 CONFIDENTIAL TIGHT HOLE 8i83 Wo$ taken by Marathon, 8211.1 TITLE: Coma CONFIDENTIAL TIGHT HOLE PAGE ~2 8155 8156 8157 8158 8159 8160 8158 8161 8161 8162 8163 8164 8165 8166 8164 8167 MOC COREA CREEK O:]:{E #2 PAGE #2 M F FVF 8167 claystone 8168 _ _' Planar - laminae wit h .- organic debris Rnely laminated - 8169 8170 8170 Massive 8171 Faint planar t o wavy laminae 8172 Organic debris 8173 8173 SI. Calcar. 8174 Shale clast s Wavy laminae 8175 8176 8176 Scour Shale clast 8177 Wispy organic laminat ions 8178 Calcareous cement Coal spars Scour 8179 MOC COREA CREEK CCRE #2 PAGE #3 8179 Laminat ed Core break 8180 Minor shale laminat ions 8181 SI. calcar. Wispy organic part ings 8182 8182 SI. caicar. 8183 Massive t o faint parallel laminar ions 8184 8185 8185 Lam inat ed 8186 Shale laminae 8187 Shale laminae 8188 8188 Lam inat ed 8189 Sand int erbeds Flames 8190 Calcareo us Shale parting s 8191 ORIGINAL ~ COREA CREEK OCRE #2 PAGE #4 M 8191 Shale parting 8192 Calcareous Planar laminations 8193 Thin shale part ings Calcareous 8194 8194 Shale part ing s Flames 8195 Organic laminae 8196 Shale partings 8197 8197 Generalized thin bedded sands in shale 8198 Lam inat ed 8199 82OO 8200 Generalized thin bedded sands in shale 8201 Burrow(?) Organic laminae 8202 Organic laminae 8203 MOC COREA CREEK CCRE #2 PAGE #5 M F I LS 8203 Laminat ed/ silty Organic laminae 8204 Laminat ed 820'5 82O6 8206 Very organic rich 82O7 Laminat ed 82O8 Approaches brown coal 82O9 VF 82O9 Very organic rich 8210 Base core #2 821'0' CONFIDEN ,'IAL TIGHT HOLE Corea Creek #1 Core #2 Plug Analysis 04/03/96 8175.50 3.8/'0 5.4~2 1000 7.752 12.0 8175, 50 3.~170 5,47'2 2000 7,407 11 ,$ 8175 50 3. B70 5,~,7'~ 3000 7.198 1142 8175,50 3Jl?0 5,472 4000 7.DBI 11,0 8181 .§5 3.B62 5,745 11:X30 9.432 14,0 6181,$5 3,862 5 745 2000 8.1775 13.3 8181.85 3,862 5 74,5 3000 8.693 8181.85 3.862 5,745 4000 8.513 12.8' 8185.50 3,843 5,664 1000 $,961 13.8 8185,50 3.8~,3 5.{~4 2000 8.737 13.3 8185.50 3.843 5,664 30~ 8.582 13,1 8185.50 3,843 5.864 4000 8,4T2 t2.9 a18;.50 3.889 5,550 looo 0.4o6 8,3 81~,50 3,888 ~.060 2086 5,~tB 7.9 slag. SO 3,866 5,550 3086 4 ~31 7,5 818~.50 3.886 S.S50 4000 4741 7.3 8193.50 3.879 5,64~ 10~0 3.142 4,7 6163.50 3.879 5.840 2000 2,864 4,3 8103,50 3.8?~ 5.840 3000 2.697 4,0 8193.~0 $,87B 5040 400:) 2,~Z 3t 819/'.,~0 3,823 5.?~0 100{3 ei,074 10(I 8197.50 3,823 S,7~O 290:) 0,183 g.4 8197,50 3,823 S.?50 3000 5,047 8107,50 3.823 5,750 4000 S.7~l 0,52~ CL73 22,44 5,55E+11 9.B8E+iX2 022" 030 0.14' 0.26 4~,1S 1,~E+12 761E+~ 0,11 0,21 ~,37 1,~E*IZ T, lOE~ 0.~ 1.12 ~.~ 1.80E+11 4.01E+~ 0,~ 0.~' 21 ~ 2.75E*12 4,12E~3 02'/. 0.44 0.19 D418 0,41 0,58 0,2~ 0.43 0.21. ~.35 04o 0.~1 0, t5 0,23 D. 02' ~.~ 1.02 ~ 1 18 · 0.10 0.13 ~.~5 0,07 1,~ I,~0 35.21 4,30E+11 3.eTF..H32 40,1~ 1,58E+11 9.t6E~.01 23,{15 4.01E+12 5.44E~3 37.42 1.71E* 11 1,46~+02 39,7~ 2,43E+I ~ t.74~+02 42,G3 2,51E+11 1.51E+02 1,75 5,18E+00 2.:ZaE+Oq 29.95 0,O0Ee00 62.34 0.OOE+0O 43.23 2.57E+14 8,50 2,~gE+11 8.28ge~2 14.07 2.136F..~.12 1,64Ee0G 18,24 ~.34E+11 3.09EeD2 18.30 4.34E+12 7.00E*03 {L7e 8.92E~.11 2.07E.~3 0,14 0,17' 11.70 3.59E+11 1,92E+~2 0,03 0.0{I 36.~ 2,29E'~13 2,751F,+03 0.01 0.03 77,86 7,71E+13 3.10E+03 FROM MARATHON DNU 04/04/96 11:4i P. 2 TOTAL P. CONFIDEk rIAL TIGHT HOLE Corea Creek #1 Core #2 Plug Analysis 04/09/96 cc mi~mna 8176.5 3.836 5.6~0 1000 9,676 14.8 2.76 3,~6 14,85 4.94E+10 4.44E+l: 8176,5 3.836 5.660 2000 9,263 14,2 1.38 1.97 21,87 8,78E+10 3,g7E+[ 8176.5 3.836 5.6~0 3000 9.009 13.8 0.97 1,42 23,57 1.72E+11 5.72E+[ 8176.5 3,836 5.680 4000 8.846 13,5 0,81 1.22 2S.88 1.81E+11 4.96E+( 8183.5 3.874 5.515 1000 6,636 10,2' 0.85 0.82 14,85 4,28E+1t 9.01E+[' 8183.5 3.874 5.515 2000 6,281 9,7 0.21 0.33 30,95 7,03E+11 5.11 8183.5 3.874 5.515 3000 6,062 9.3 0.12 0,21 42,09 2.12E+12 8,95E+[ 8183.5 3,874 5.515 4000 5.923 9. I 0.09 0,17 49.50 1.78E+11 5,48E+C 8186',,5 3,837 5,308 1000 9.294 15,1 4,67 5.37 7.41 2.03E+10 3,17E~-£ 8186.5 3.837 5,308 2000 8,862 14.4 1.63 2,18 16,77 7,25E+I0 3.7gE+¢ 8186.5 3,837 5,308 3000 8,602 14.0 0,95 1,39 22.95 1.20E+11 3,85E+[ 8188.5 3,837 5,308 4000 8.440 13,8 0,72 1 .og 25.28 1.48E,1.11 3,~1 FROM MARATHON DNU 04/i0×S6 10:37 P · ORIGINAL. TOTAL P. 2 3033475704 I::~SVR CHAR PA6E 02 Corea Creek #1 Core I Plug Analysis 04/23/96 5869.5 3,831 5,a35 1000 13.020 tg. 4 'fe.-~.' 20.5, 10,52 1.g2E+0B g. BIE~-01 ._._.,~- ~5g,5 3.~1 5.~ 20~ 12.~ 17.9 g.~ 12.31 11.33 3.~E+~ 1,~E*~ 5~9.5 3,~1 5.8~ ~ 11,5~ 17.1 ,7.~, ~.28 11.~ 4.31E+~ 1,03E+~ 5~.5 3.81g 5.373 10~ 11.142 18. [ ,~. 1ZO7 8. g3 1.01 E*~ 3.~Ee01 5~0.S 3.alg 5.373 ~ 10.~ 17.3 8~3 I0,~ 10,31 I.~E+0e 3.3gE+01 5~0.S 3.81g 5.373 ~ 10.~3 18,9 ~.S~ 9,20 10.43 ~5.4 3.~ 6.~ 1~ 11.~ 15.0 3.~ 4.~ 13.~ I.~E*10 5~5.4 3.~ 6.5~ ~ 10,871 14,3 2.~ 3,~ 15.59 3.71E+t0 SACS.4 3,~ 6.5~ 3~ 10.5~ 14,0 2,12 2.~ 16.~ 5.03Ee10 ~.5 3.~ 5.7al 1~ 8. g~ 13.e 0.SB 0.~ 18.~ ~.5~+~2 2,47E~03 ~.5 3.6~ 6.781 ~ 8.~6 12,8 0.06 0,~6 40,~ 2.2~+~2 5.~E+02 ~5.5 3,~ 5.781 ~ 8.042 1Z2 ~ 0.~ 60.42 1.2~*13 1 74E+03 ~.5 3.~ 6.~ 1~ 13,746 17.1 . O.Z-3 11.8 10.~ 1.31E, OO ~.~E~I ~ 5 3.~ 6.~ ~ 13,198 t8.4 7,~ g,33 10.95 t.7~+0g 4,31E~1 ~.5 3.~1 6.783 1~ 12.4~ 15.8 18'~~ 21,43 8.16 3.53E+08 ~.5 3.~51 6,783 ~ 11,7~ 14,9 13.~ '15.~ 8,g7 5.08E+08 2.1~+D1 ~.5 3.851 6.7~ ~ 1t.~ 14.4 10.~ 12~ 7.52 5.28E,08 1.~+01 ORI61N,A,L COMPANY WELL FIELD COUNTY COUNTRY LOCATION: ELEVATION: DATE --, :3NFIDEN'I' AL MARATHON OIL COMPANY CORF_.A CREEK FEDERAL #1 FALLS CREEK SEWARD MERIDIAN STATE ALASKA U.S.A. LSD SEC 12 TWP 1N RGE KB DF GL 19-MAR- 1996 FILE NO. 57111-96085 13W CORE ~ DENSITY GAMMA -r INDEX Totol U I Th i K Bulk Corl Gammo IXom IXOm ~: DensiL'y. Index APl gm/cc _ 150 0 25 1.6~ 2.~5 Uranium Free Gamma 0 APl ..... 150 $ Total O Bulk ~ Gamma P~ Densi~.l~ex Uranium F~ ~mma TOTAL U~IUM CORE IND~ COMPANY WELL FIELD COUNTY MARATHON OIL COMPANY COREA CREEK FEDERAL #1 FALLS CREEK SEWARD MERIDIAN STATE ALASKA MARATHON 0il Company Sfrucfure : Corea Creek Federal I~1 Well : CCr~/1 Field : Exploration Location : Clam Gulfch, Alaska o 500 1000 1500 2000 2500 ,.'4)00_ ~OOO_ -- -- 5000_ -- 55~ _ 6000_ 6500. 7000_ 8000. 8500_ 9000_ 9500... <-- West rmon 2200 2000 1800 1600 1400 1200 1000 800 600 20 L m3 3/8 co,ing i i i I I i i i i i i I i i i i I i End of B~ild g ,5/8 Ce.lng End of Hold [nd of Drop Co~ Creek - TD ~ K;ck off Point I I I { I I I I I I I { I I 500 1000 1500 2000 2500 3000 ,.7,500 250.00 &~:tl~ ~ 315.08 .zlm~th with ¢~ere~O.O0 N, 0.00 Ir Carlo Crllk -- Ti) 400 I Scale 1 : 100.00 200 0 200 I I I I I , 2400 _2200 _2000 -- _1800 -- _ 1600 1200 . _10o0 o o 0 200 ~ o Created by : jones Date plotted : 5-Apr-g6 Plot Reference is Coreo Ck FedS1 Vers. ~1 Coordinates are in feet reference slot ~1. True Vertical Depths are reference RKB. --- Baker Hughes INTEO --- I I Z O MARATHON 0il Company Structure :Cor. a Creek Federal ~1 Well : CCF~! Field : Explor~tion Location : Clam Gulfch, ~laska I I V 500 _ 1000_ -- 2000_ 2500_ 3000. 3500_ 4000_ -- 4500_ -- 5000_ 5500_ 6000. 6500. - 7000_ - 7500_ 8000, ~8500_ -- 9000_ -- 95OO 20 caalng ,L 13 3/8 Casing <-- West 2200 2000 1800 1600 1400 1200 1000 800 600 I I I I I I I I t I I I I I I I I I Kick off Point End of Build 9 .5/8 Caling End of Hold End of Drop Coreo Creek - TD .. I I I I I I I I I I I I I I I 0 500 1000 1500 2000 2500 3000 ,3500 ~cale I : ¥1H~r..l ~IIMI em 315.08 mdmMh MM ~4me 0.00 H, O.~O £ fr~m II~ #1 Coreo Creek - TI3 ccFf~ ~gt t~ 400 I Scole 1 : 100.00 20O 0 200 I I I I I 2400 _2000 _1800 .1600 _1400 _1200 -- _ 1000 _800 ,400 _ 200 0 2OO Z o o 0 Created by : jones Date plotted : 5-Apr-g6 Plot Reference is Coreo Ck Fedl~l Vers. ~1. Coordinates are in feet reference slot ill. True Vertical Depths ore reference RKB. --- Baker Hughes INTEO --- MARATHON Oil Company Sfrucfure : Cores Creek Federal ~! Well : CCF~I! Field : £xploroflon Location : Clam Gulfch. Alaska O - .. 500, 2OOO 5500_ 6000. 75OO 8500 _ 9500 , 20 Co~ing L 13 ~/8 Catlng Kick off Point ~ -- - W e s t ~co,~ 1 ' 100.00 2200 2000 1800 1600 1400 1200 1000 800 600 400 200 0 200 I I I I I I I I I I I I I I I I I I I I I I I I I 2400 ~\End of Build 9 5/8 Coming Tgt ~1! '~E:nd of Hold End of Drop Core~ Creek - TO . ~ [ I I I I I I I i I I I i I I 0 500 1000 1500 2000 2500 3000 .3500 CCFiII1 tgt Jlt Seole 1 : 250.00 Yerlkal ~m~lee~ aa 31e,,O~ ~zlmu~h ~1~ M~e 0.00 N, 0.00 ir fearn ~ ~l _ 1600 - _1200 _1000 - , - _ 2OO _ 0 - Created by : jones Date plotted : 5-Apr-96 Plot Reference is Cores Ck F'edl~! Vera. ~1. Coordnates ore in feet reference slot ~1. ITrue Vertical Depths ore reference RKB. --- Baker Hughea INTEO --- MARATHON Oil Company Structure :Corea Creek Federal ~1 Well : CCF~I Field : Exploration Location : Clam Gultch, Alaska 0 ~ .. SOO _ ~ 5500_ 9500 20 Coa/~j ,L 13 3/8 casing I I I I I I I I I I I I I I I I I I I I I I I I I <Z -- - W e S t Sco,e , · ,oo.oo 2200 2000 1800 1600 1400 1200 1000 800 600 400 200 0 200 2400 Kick Off Point L' End ef Build old End of Drop Corec Creek - TI:) I I I I I I I I I I I I i I I 0 500 1000 1500 2000 2500 ,3000 ,3500 Scale 1 : 250.00 Coreo Creek -- 'ID ¥1dlt, al ~lgflmt en 51S.0~ azlmlath wlNt I~e~l~ee O.O0 H, 0.00 £ fi'em i1~ #1 _2200 - _ 1200 J .. o - o 0 _ 20O .c) _. Created by : jones Date plotted : 5-Apr-g6 Plot Reference is Cores Ck Fed~t Vers. #1. Coordinates are in feet reference slot True Vert col Depths are reference RKB. --- Baker Hugheg INT£O --- * SCHLUMBERGER * DIRETIONAL SURVEY COMPANY : MARATHON OIL COMPANY WELL : COREA CREEK FEDERAL FIELD : WILDCAT COUNTRY : USA RI/N : 2 REFERENCE : 96100 i SURVEY CALCULATION AND FIELD Wt.,.,KSHEET Job No. S d,tr,ckNo. Pag. 3 : Company MARATHON OIL COMPA~ Rig ~ra~or & No. Pool Arctic Alaska - Rig: ~I~D Field ~PLO~TION Well Name & No. ~R~ CREEK FEDE~L ~1 Suww ~on N~e ~CO ~ BHI Rep. ~RK D~O I~ WELL DATA Taroet ~D ~ TarGet Coord. N/S Slot C~rd. N/S 1~7,~ Grid Corre~on 0.~ ~pths Measured From: RKB Target Description Targ~ ~ord. ~ Slot C~rd. ~ -1~3.~ Magn. D~linafion 21.~ Calculation Me, od MINIMUM CURVATURE Target Direction ~ Buil~Walk~DL per: 1~ ~m~ lOm~ Ve~ Se~. ~im. 315.~ Magn. to Map ~rr. 21.~ Map No~ to: OTHER SURVEY DATA Suwey Suwey Incl. Hole Course Vedi~l To~l Coordinate Build Rate Walk Rate Date Tool Dep~ Angle Dire~on Len~ ~D Se~on N(+) / S(-) E(+) / W(-) DL Build (+) RigM (+) ~mment Type ~ ~ ~ ~ ~ ~ ~ per ~ ~ Drop (-) L~ (-) I~R-~ ~D ~3.~ 31.45 317.14 1~.~ ~1 .~ 1742.~ 1213.~ -1251.05 0.57 0.~ 0.~ I~R-~ MWD ~.~ 31.41 316.95 ~.~ 49~.~ 17~.~ 1245.~ -1 ~1.25 0.12 ~.05 ~.~ I~MAR-~ ~D ~78.~ 31.24 317.37 ~.~ ~.71 1~.~ 1279.~ -1313.~ 0.31 ~.19 0.47 I~R-~ ~D ~72.~ ~.~ 316.59 ~.~ 5111.19 1~1.~ 1315.~ -1~.~ 0.~ ~.~ ~.~ ~.91 316.18 ~.~ 51~.~ 1~.~ 1~9.~ -1378., 0.24 ~.~ ~.44~ ---~.~~ I~R-~ M WD I~MA~ ~D 57~.~ ~.~ 316.17 ~.~ ~9.~ 1976.81 1~.87 -1411.~ 0.28 ~.~ ~.01 ~/~. 1,~R-~ ~D 5789.~ ~.~ 316.~ 32.~ ~7.~ 1~.~ 1~5.~ -1423.~ 0.~ ~.37 0.59 ~,~~~ I~MAR-~ MWD ~1.~ ~.~ 315.72 ~.~ ~..~ ~9.~ 14~.~ -14~.21 0.74 ~.~ ~.70 Wl'- ~~ 17-~R-~ MWD ~51 .~ 28.81 316.~ ~.~ ~.~ ~1.61 1~9.~ -1 ~2.01 0.~ ~.47 0.~ 17-MAR-~ MWD ~.~ 28.~ 317.07 93.~ ~.~ ~.~ 1~.49 -1612.71 0.~ ~.01 0.~ I~MAR-~ MWD ~.~ 28.19 317.~ ~.~ ~3.11 2~.59 1~7.45 -1672.~ 0.~ ~.~ ~.05 ~ ~ ~ I~MAR-~ ~D ~21.~ 28.~ 318.~ ~.~ ~4.19 2~.~ 1~.~ -1701.71 0.~ 0.~ 0.~ ..... c, ~ I~R-~ ~D 6714.~ 27.~ 318.~ ~.~ 61~.23 2~1.75 17~.~ -17~.~ 0.~ ~.28 0.~ :~.~ oJ ,: 1 ~R-~ MWD ~.~ 27.75 319.10 . ~.~ 6187.57 2~.~ 17~.~ -17~.14 0.~ ~.23 0.~ . ,?~ E:) -. ~.._ ~ . .,- .. .,_. I~MAR-~ ~D ~.~ ~.~ 319.~ ~.~ ~71.~ 2~7.71 1787.39 -1787.~ 0.~ ~.~ 0.~ ; ~ < r I~MAR-~ ~D ~3.~ ~.49 319.~ ~.~ ~.13 2~.41 1819.17 -1814.~ 0.~ ~.49 0.17 _ ~..-. I~R-~ MWD 7~1 .~ ~.~ 319.73 ~.~ ~.~ ~.~ 1~.~ -1~.74 0.~ ~.51 0.~ I~R-~ ~D 7175.~ ~.~ 316.~ ~.~ ~17.51 ~9.41 1879.~ -1~7.~ 1.~ ~.01 ~,49 ~R-~ ~D 7~.~ 23.~ 317.73 ~.~ ~1 .~ ~.42 1~.10 -1 ~.87 2.~ -2.61 1 .~ ~MAR-~ MWD 7~1 .~ ~.16 315.~ ~.~ ~7.~ 2724.~ 1~.~ -1918.79 1 .~ -1 .~ -2.91 SURVEY CALCULATION AND FIELD WI....KSHEET Job.o. 0e( 755. Company MARATHON OIL COMPANY Rig Contractor & No. Pool Arctio Alaska - Rig: #122D Well Name & No. COREA CREEK FEDERAL ~1 Survey Section Name TELECO MWD WELL DATA Sldetreok No. ~ Pagu ~ Field EXPLORATION BHI Rep. MARK DEYO Target 'I'VD (FT) Target Coord. N/S Date 14-MAR-96 14-MAR-96 14-MAR-98 14-MAR-96 14-MAR-96 16-MAR-96 17-MAR-96 17-MAR-96 17-MAR-96 17-MAR-96 17-MAR-96 17-MAR-98 18-MAR-96 18.-MAP,-gG 18-MAR-96 18-MAR-96 20-MAR-96 Survey Depth 5478.00 5572.00 5757.00 5881.00 5974.00 6159.00 6251.00 6437.00 6621.00 6714.00 7081.03 7175.o0 7268.00 7361.00 SURVEY DATA Hole Course Vertical Total Coordinate Build Rate Direction Length TVD Section N(+) I $(-) E(+) / W(-) Build (+) (oo) (FT) (FT) (FT) (FT) Drop (-) 317.14 103.00 4881.30 316.95 85.00 4953.83 317.37 90.03 5030.71 316.59 94.00 5111.19 316.18 92.03 5190.09 316.17 93.00 5269.99 5297.54 316.36 32.03 315.72 92.03 5377.02 315.66 93.00 5457.69 1742.32 1213.02 -1251.05 1786.62 1245.46 -1281.25 1833.38 1279.77 -1313.68 1881.92 1315.28 -1346.20 1929.22 1349.54 -1378.84 1976.81 1383.87 -1411.80 1993.09 1385.64 -1423.05 2039.40 1428.98 -1455.21 2085.67 1462.10 -1467.53 2131.28 1494.70 -1519.40 2176.98 1527.55 -1551.20 2221.61 1559.85 -1582.01 2266.40 1592.49 -1612.71 2310.95 1 625.25 -1 642.96 2354.59 1657.45 -1672.46 2398.03 1689.63 -1701.71 2441,75 1722.33 -1730.64 2484.64 1754.68 -1759.14 2527.71 1787.39 -1787.34 2569.41 1819.17 -1814.52 2608,22 1848.84 -1839.74 2649.41 1879.53 -1867.29 2688.42 1908.10 -1893.87 2724.55 1934.29 -1918.79 315.64 92.00 5.537.60 316.24 93.00 5618,59 316.44 92.0o 5699.03 317.07 93.00 5780.53 317.51 93.00 5862.14 317.46 92.03 5943.11 318.05 92.03 6024.19 318.55 93.03 6106.23 319.10 .92.00 6187.57 319.38 94.00 6271.06 319.54 93.00 6354.13 319.73 68.00 6,433.05 316.45 94.03 6517.51 317.73 93.03 6601.92 315.02 9~.00 6687.6O Walk Rate Right (+) Left (-) Comment 0.52 0.45 -0.28 -0.01 -0.37 0.59 -0.65 -0.70 -0.19 -0.06 -0.10 -0.02 -0.45 0.64 · 0.47 0.22 -0.01 0.68 -0.32 0.47 -0.34 -0.05 0.03 0,64 -0.28 0.54 · 0.23 0.60 -0.85 0.30 -0.49 0.17 -0.51 0 -0.01 -3.49 -2.61 1.38 -1.55 -2.91 SURVEY CALCULATION AND FIELD ,KSHEET Job No. 04,50.75 _ _ Sidetrack No. Pagt, 3 Company MARATHON OIL COMPANY Rig Contractor & No. Pool Arctic Alaska - Rig: #122D Field EXPLORATION Well Name & No. COREA CREEK FEDERAL ~1 Survey Section Name TELECO MWD BHI Rep. MARK DEYO ~'N"r~l~ WELL DATA Target TVD (F3) Target Coord. N/S Slot Coord. N/S 1567.00 Grid Correction 0.000 Depths Measured From: RKB ~ MSL ~ SS~ Target Description Target Coord. E/W Slot Coord. E/W -1573.00 Magn. Declination 21.900 Calculation Method MINIMUM CURVATURE Target Direction (c~ Buil~Walk\DL per: 100ft[~ 30mr'! 10m0 VerL Se<=. Azim. 315.08 Magn. to Map Corr. 21.900 Map North to: OTHER SURVEY DATA Survey Survey Incl. Hole Course Vertical Total Coordinate Build Rate Walk Rate Date Tool Depth Angle Direction Length TVD Section N(+) I S(-) E(+) /W(-) DL Build (+) Right (+) Comment Type (FT) (OD) (130) (FT) (FI) orr) (FI) (Per 100 F'r)Drop (-) Left (-) 14-MAR-96 MWD 5303.00 31.45 317.14 103.08 4881.30 1742.32 1213.02 -1251.05 0.57 0.52 0.45 14-MAR-96 MWD 5388.00 31.41 316.95 85.03 4953.83 1786.62 1245.46 -1281.25 0.12 -0.08 -0.22 14-MAR-96 MWD 5478.08 31.24 317.37 90.08 5030.71 1833.38 1279.77 -1313.08 0.31 -0.19 0.47 14-MAR-96 MWD 5572.00 30.99 316.59 94.00 5111.19 1881.92 1315.28 -1346.20 0.50 -0.26 -0.83 14-MAR-96 MWD 5664.00 30.91 316.18 92.08 5190.09 1929.22 1349.54 -1378.84 0.24 -0.09 -0.44 14-MAR-96 MWD 5757.00 30.65 316.17 93.00 5269.99 1976.81 1383.87 -1411.80 0.28 -0.28 -0.01 14-MAR-g6 MWD 5789.00 30.53 316.38 32.00 5297.54 1993.09 1395.64 -1423.05 0.48 -0.37 0.59 /.*~,~,~i '~'~ 16-MAR-96 MWD 5881.00 29.93 315.72 92.03 5377.02 2039.40 1428.96 -1455.21 0.74 -0.65 -0.70 17-MAR-96 IVWVD 5974,00 29.75 315.66 93.08 5457.69 2085.67 1462.10 -1487.53 0.20 -0.19 -0'08 i~'~-::' , --, 17-MAR-96 MWD ~.00 29.56 315.64 92.00 fi~.qO7.60 2131.26 1494.70 -1519.40 0. t0 -0.10 -0.02 ~.! 17-MAR-96 MWD 6159.00 29.24 316.24 93.00 5618.59 2176.96 1527.55 -1551.20 0.55 -0.45 0.64 1 7-MAR-96 MVVD 6251.00 28.81 316.44 92.00 5699.03 2221,61 1559.65 -1582.01 0.46 -0.47 0.22 ~. j, .... · 17-MAR-96 MWD 6344.00 28.80 317.07 93.00 5780.53 2266.40 1592.49 -1612.71 0.33 -0.01 0.68 :!~,.~ '-~ ?.._: ~.~. 17-MAR-96 MWD 6437.00 28.50 317.51 93.00 5862.14 2310.95 1625.25 -1 642.96 0.39 -0.32 0.47 ;;:.:~ _ i 18-MAP,-96 MWD 6529.00 28.19 317.46 92.00 5943.11 2354.59 1657.45 -1672.48 0.34 43.34 -0.05 18-MAR-96 MWD 6621.00 28.22 318.05 92.00 6024.19 2398.03 1689.63 -1701.71 0.30 0.03 0.64 18-MAR-96 MWD 6714.00 27.96 318.55 93.00 61 08.23 2441.75 1722.33 -1730.84 0.38 -0.28 0.54 18-MAR-96 MWD 6806.08 27.75 319.10 92.00 6187.57 2484.64 1754.68 -1759.14 0.38 -0.23 0.60 18-MAR-96 MWD 6900.08 26.95 319.38 94.00 6271.08 2527.71 1787.39 -1787.34 0.86 -0.65 0.30 18-MAR-96 MWD 6993.00 26.49 319.54 93.00 6354.13 2569.41 1819.17 -1814.52 0.50 -0.49 0.17 119-MAR-96 MWD 7081.00 26.04 319.73 88.00 64,33.08 2608.22 1848.64 -1839.74 0.52 -0.51 0.22 ~19-MAR-96 MWD 7175.00 26.03 316.45 !M.00 6517.51 2649.41 1879.53 -1867.29 1.53 -0.01 -3.49 20-MAR-96 MWD 7268.00 23.60 317.73 93.00 6601.92 2688.42 1908.10 -1893.87 2.68 -2.61 1.38 20-MAR-96 MWD 7361.00 22.16 315.02 93.00 6687.60 2724.55 1934~9 -1918.79 1.92 -1.55 -2.91 SURVEY CALCULATION AND FIELD WI.,.,KSHEET JobNo. S d, ack No. P,g, 3 Company MARATHON OIL COMPANY Rig Contractor & No. Pool Ar, tic Alaska - Rig: #122D Field EXPLORATION Well Name & No, COREA CREEK FEDERAL ~1 Survey Se~ion Name TELECO MWD BHI Rep, MARK DEYO J~l~"~~ WELL DATA Target TVD (F~ Target Coord. N/S Slot Coord. N/S 1567.00 Grid Correction 0.000 Depths Measured From: RKB ~] MSL ~ SS[- Target Description Target Coord. E/W Slot Coord. E/W -1573.00 Magn. Declination 21.900 Calculation Method MINIMUM CURVATURE Target Direction (Do) Build~Walk\DL per: lOOft[~ 30mO 1OmO Vert, Sec, Azim, 315,08 Magn, to Map Corr. 21,900 Map North to: OTHER SURVEY DATA Survey Survey Incl, Hole Course Vertical Total Coordinate Build Rate Walk Rate Date Tool Depth Angle Direction Length TVD Section N(+) / S(-) E(+) ! W(-) DL Build (+) Right (+) Comment Type (F'q (DO) (OD) (Fq (FT) (Fr) (F~ (P~r SO0 F~ Drop (-) Left (-) 14-MAR-96 MWD 5303,00 31,45 317,14 103,00 4881,30 1742,32 1213,02 -1251,05 0,57 0,52 0,45 . .,~.~ ' 14-MAR-96 MWD 5388,00 31,41 316,95 85,00 4953.83 1786,62 1245,46 -1281,25 0,12 -0.05 -0,22 14-MAR-96 MWD 5478,00 31,24 317,37 90,00 5030,71 1833,38 1279,77 -1313,06 0,31 -0,19 0,47 14-MAR-96 MWD 5572,00 30,99 316,59 94,00 5111,19 1881,92 1315.28 -1346,20 0.50 -0,26 -0,83 14-MAR-96 MWD 5664,00 30,91 316,18 92,00 5190,09 1929,22 1349,54 -1378,84 0,24 -0,09 -0,44 14-MAR-96 MWD 5757,00 30.65 316,17 93,00 5269,99 1976.81 1383,87 -1411,80 0,28 -0.28 -0,01 -~ - - 14-MAR-96 MWD 5789,00 30,53 316,38 32,00 5297,54 1993,09 1395,54 -1423.05 0,48 -0,37 0,59 i.~ '~' 16-MAR-96 MWD 5881,00 29,93 315,72 92,00 5377,02 2039,40 1428,98 -1455,21 0,74 -0,65 -0,70 .-;~ 17-MAR-98 MWD 5974.00 29.75 315.66 93.00 5457.69 2085.67 1462.10 -1467.53 0.20 -0.19 -0.06 :~-::~ ¢~ :~ ~ .: --~ 17-MAR-96 MWD 6066.00 29.66 315.64 92.00 5537.60 2131.26 1494.70 -1519.40 0.10 -0.10 -0.02 17-MAR-96 MWD 6159.00 29.24 316.24 93.00 5618.59 2176.98 1527.55 -1551.20 0.55 -0.45 0.64 . 17-MAR-96 MWD 6251.00 28.81 316.44 92.00 ,5699.03 2221.61 1559.65 -1582.01 0.46 -0,47 0.22 17-MAR-96 MWD 6344.00 28.80 317.07 93.00 5780.53 2266.40 1592.49 -1612.71 0.33 -0.01 0.68 17-MAR-96 MWD 6437.00 28.50 317.51 93.00 5862.14 2310.95 1 625.25 -1642.98 0.39 -0.32 0.47 18-MAR-98 MWD 6529.00 28.19 317.46 92.00 5943.11 2354.59 1 657.45 -1672.48 0.34 -0.34 -0.05 18-MAR-98 MWD 6621.00 28.22 318.05 92,00 6024.19 2398.03 1689.53 -1701.71 0.30 0.03 0.54 18-MAR-98 MWD 6714.00 27.96 318.55 93.00 6106.23 2441.75 1722.33 -1730.84 0.38 -0.26 0.54 18-MAR-96 MWD 6806.00 27.75 319.10 92.00 6187.57 2484.64 1754.68 -1759.14 0.36 -0.23 0.60 18-MAR-96 MWD 6900.00 26.95 319.38 94.00 6271.06 2527.71 1787.39 -1787.34 0.86 -0.85 0.30 18-MAR-96 MWD 6993.00 26,49 319.54 93.00 6354.13 2569.41 1819.17 -1814.52 0.50 -0.49 0.17 19-MAR-98 MWD 7081.00 26.04 319.73 88.00 6433.05 2608.22 1848.84 -1839.74 0.52 -0.51 0.22 19-MAR-96 MWD 7175.00 26.03 316.45 94.00 6517.51 2649.41 1879.53 -1867.29 1.53 -0.01 -3.49 20-MAR-98 MWD 7268.00 23,60 317.73 93.00 6601.92 2688.42 1908.10 -1893.87 2.68 -2.61 1.38 20-MAR-98 MWD 7361.00 22.16 315.02 93.00 6687.60 2724.55 1934.29 -1918.79 1.92 -1.55 -2.91 625263 MCLANE CONSULTING GROUP P.0i FACSIMILE TRANSMITTAr_ SHEET Core~ Creek Federal N%. 1 F~~ TOTAL NO. O11 1 Geo~p~ Coo~ Secdo~ 12, TIN, R 13W, Se~u'd M~d&~ AK ~on 12 ~~~ ~m NGS S~on '~-&~ ~co~ ~ ~. N~ ~m~ del 1'57.33F' N ~ ~'05~' N HOLE I5~°~'16-815'' W SE Comer Comer P.O, BOX 468 $OLDOT'NA, AK 99669 ~PR ~1 '96 05:~1RM SHP DRILLIMG MOC P.i×~ DATE ~ RPT 55 FIELD ~REA CRI~EIC VELL NAME L'~EA rREEF~ FED #1 No 1 RZG AFE $ __~,271000 DEEPEST TARGET TTOHEK a ~ PTVD 9C)QQ. AFE,NO. DFPTH (140) ~ (TVD) 8~T3 FOOTAGE -HOuK$ PRESENT OP: RTG RELEASED TO O[JqOB __ .., LArr ~£zqc O.D. ~ LAST LJ~,~aNb ~ill~,~ DEPTH ,~.6~ f~! ~;H~ TEST PeG "":"' '"'-- ttl.l.l!!? ' -- '""" '"'"' '""" '"'"'"'"'-- .'"'-' ~,,r.~ ~. u.u, VAL - ft. RHI~ TFqT IaPC PRoaNogED DAY3 40 Lf¥CR ~1 U.u. INTERVAL . ---- ft. SHOE lEST ----- ppg , ,, ExEt~JTI YE SUN4ARY; )U'D DOP,~I, 14.,~.J 'I'RE~ ANu IF~lt:u ~e, ME TO 5Q00 PSI. RELEASED. RIG T9 DEIdOB AT 1.300 , ,., ,,. · i .....-:.., , ,, BIB ~r Iq q uJr ~ pu vp &EL5 __~__ p~ e e UL HPNT ML Pm 0 Pf/#f_ / ' -- Ct l~--~Ca ~0 X Oit~ X SOLIp~ ii[HTi',~liT __.! q..__~ DIIILLKO _qT.~_ i DP# ail ::t~,. #L -- TOT SPI4 ----- PRESSURE .____. TOT GP~t ~ ANN VEL DP __ DC ClZI ~ ., __ ,. dY: _____ BIT PRESSURE DR~o: __ psi BIT HP: -.-.---_ BIT HP/jn2: ----___ · ,, ,. , .... ROTA'TING STRING I,/T. __. BHA VT. IN WJD: RPH: - SLACK OFF 141. ~ I~01 ~a~.~: '.':,i~.!.i; fHa:h~: .'..,i.:~'~..:'."~'"';v:.::.....: ......... ~ ...... ...... - ........ · -. ',,~',',',',',',',',',' ' ~t'o~~~,~,:,,:;,,,',',',;.,i,~ .... ?'?'i'~?":.'i.~;". e,,~,,,,,,~, _.________.__'RI ELEAS TO D AT I 00 HR i i · i ,, i - , , .. ,, · ......... · - ,,*, h; ""r ~,.:,I~' . ,.,., ...... ..,,. . .... ~', .... :": "i' r:, "':.i":' , ,, -- , -- DALLY UCLL 005T$ 16?'~.~ ~ ~ nJt~v I, nX~,I: ._ ~lJl~ Pn6~11' ~upapvtow~ ~LL_ .. ii il i i i i DATE: J~it21f~)~ llill .q:1211 ~W OIRE~IN i HT. - ~ PITCH ~. ~D ~ ~- -- ~l~ ~ ~1~ . ~_ "' , i ~ ~S to TOTAL: 18 ~E~J~ ~S to T~IP ~ to . 8L~ ~ BATES T~N G ft. P~ ~. 1 ~~ ~-- ~ ...................................................... . .......... '. ' ' '" -- ~:~,;:;~:';:~:':: ~ ...": ....... .'.:'.'...~:,~.~: :'S ,,' g~A':;N~O~,~,:t."':/" ' .';~' ,'m~.,.'"','.'~';";4;:~ ~q~.~.,.'.w w,';'~ '~. ~., .r .':f '1'11'1 '' I/llll~llll llll J J il' IIIIIIIIIIIIIII J Jllllllllljlllllll JJllllllllllllllllll ~JrJ ~ {~ .., .~.. . ]--,. ,, . ,..,....,..... .... ,, ,. ................... ,. ~, O s~ ' " , , ,, , , S~L~ DEN= _ ~E ~ESS: ' ' , , , , . . , , , , iNC~ TGNCI~C (~000 L~) ' " ' · , ,,, , , 1. 2. ' ' ,,, ~ , 3. (. . , 7. 8. ' .... ~ , ,, ..... ill ii i , ~LL JOINT ..... . ~GLE ~ FEET D l RECT l ~ ........ , , ,, ~ .... m , , , , ., ACCIDENTS RE~T~ ~ST 2& ~S: .... ' -- NA~ O; INJ~ED ~ _ ' .... ~L~R : _ --- " ' ~IAL ~C. ~. : ' ' DE~iPT'I~ DF ~IDENT: ' ' TOTAL 8~ ~F.~TH: ' , ~S ~ J~S= ~ NO. $TAT~ OF INJUR~: N~S ~ DC: ........ . , ~RS f::Tb:~'~L;,~::g~:~:;::', :' ',:t ::: ~:~;:~ .'.~,,":' ~ :~,:::.,,,.,:.'".H..L~.,. ..... ; :. . . .:, ..r., ..... . ,~.;...~.;..,~:~ ':":-'; ", ,.~,~.,:~',~ :~:: :',',','.,,,,.,.:., .': ,'::: ,,,',:,,.:.',~,'t: d,,:,u ,,;,.,~ '~:~,, '~ .......... ,.:: : F~I ' ' '~"~' ' .,. ,,.,.'.i ...... .. ..... ,.. ,, ,",.i'",' , ...... ,,, .... ,. ,,,,..,."'~,,,,~,...!~,~,.m~JE.,..,... , /.....' .' ~',' ......... . ......... . . .... .,..,~.,' ...... , -..---' 't' .... j ...... . .,......"" ...~...'., . ' . ' ' ' .t ---~...,.., ................. ~, ",,,: ...... ......... ..... .~ , ....... . ...... , R~,~:,~,~z~,~t~E~E~...~.:,~e,',',' ,.. _ . DEPTH *NGLE, o]~KCT~ . . t~ . 'NI~ ' Fm Vi.T. JiC. "O~ ~. -- ~ 16.~ ~1~.~ ~.~ ~8.~ -~.02 ~1.~ 2.0Z2 ~20 14.~ 316.57 ~15.87 2~.69 -2~3.1s ~.2& 2.~ ~13 12.~ 31~.58 ~.21 ~.~ -~058.s7 ~.~ 2.377 81~ .10.91 319.5¢ ~9T.?~ 2~.SQ 81~ lU;~& ' 3~1.~ 7459.13 2105.~ ~61 9.~ 3~0.~ ~49.~ 2118.30 -Z~9.19 ~.15 1.~ ~S4 7.92 319.97 7~1.60 21~. 19 -2~.~2 ~7 6.~ 319.~ ' ~.~ 21~.~ -2105.91 3001.13 1. ~19 1 ,~9 ~55,67 8104.97 Z156.~ -il 16,45 ~OZ1 .~ 0.~ ~12 1 .~ ~5~.~ A197. O~ ~1~0,~5 -2116,~ ~.~J 0.~15 ~u . ~.25 350.~ ~,62 2176.6~ -2119.31 To~7.M 0,~ NOTES: · , C~CED 1Q~ FOR D~H~, 30K F~K IMdK~IOU OF ~ AT /GF. lg3~O ~0 OBLS OF SL~RY, 1500 B~LS FL~ TOTAL ~9 9BLS. ~A~ q~T n~N GIVE~ ~ ~ OF SLU~Y gAS ~KEUP ~ATER. BEEN INL~ iN SLUfi~ ioTAL H~VER. ' ' '' . ( RPR ~0 '96 05:4~RM SHP DRILLIHG MOC P.i×~ DATE O&[:~O/9~ APT 5& FIELD ,CO~F,J~QREEI~ UELL NA~ CC~EA__C_~EK FEO ~1 Uo 1 RZG 12~ ~FE $ 4Z71000 DEE~ST T~GET TYVEK ~ _5700 PT~ ~O AFE.NO. ~~ ~[PTH C~) ~ (~) _~ F~T~ H~RS _ PRE~T ~: M/D ~'S . LAST ~SZNG O.D. 7.000 ~T ~SZNG S~ DEPTH ~ ft. SH~ TEST PPG DAYS ~ L~TIOM ~INEI 1 O.D. ~ ~NTEgV~ . ft. SH~ TEST ' PPG DMS $ZHCE S~ L~NE~ Z O.D. ;iT~VAL - ~ ft, S~ TE~ .... PPG PR~ DAYS Lt~ 3 O.D. ~NTE~VAL -~-., . - ....... f~. S~ TE~ ~ PPG ..... , · , , , , , F[NI~ RUNNIK ~Z~ ~I. NG ..... ~ZR~LATED ~ 2NHIBIT~ ]~CL...~T P~ER. TE~GD P~KER. ~ING >NT, SET B~. ~GED R~G..I~ STA~ TO ~", PREP TO N/D B~G. _ ,, i ii .... .- , .i ,, ~ ~ 8.~ VZS ~ PV YP ~LS ~ pH ~.6 ~ HPHT ~ ~ O Pf~f / CL ~O~ Ca ~0 20i~ ~ SOLZOS ~ GENT/~LT ~~ 5.~ ORZLLED-2~.~ 8ARZTE 2~.5 , DC CRZT S~ ~1 S~ ~ TOT S~ ,, PRES~E ,, TOT G~ ~N ~L DP , ,,. _. -- ..... ... BZT HP/i~: 3V: ..... BIT PRKS~ OR~: ~i BIT HP: . , - R~ATING STRING ~. B~ ~T. IN ~: R~: PI~ ~ ~T. HANGE~ ~ ~TKL ~IHE. ,~HDED H~G~R. T~IHG ~S ~881YED ~ND , ___ EXTEK~ ~Y T~STK~ ~ ~ P~i. ,, ' .... 1~:~ 16:~0_2.50 .gROttO BALL AND LET SAIqE FALL. 'PRE~R~_.UP T~ 2500 PSi AND SET ~ .... p~KER AT ~1~'. TUBING TAIL AT 5~e. SHEARED~T~RLL AT ~00 PS!. . , T~ST~O PA~KER AND AN~LUS ~ITH ~TUB~NG ~N TO ~00 PS~ ~. L/D LANDING .,. JOINT. SET B~, . '~U 16t~ 06~00~'1].50 HELD SAFETY.~E~G, PULLED AND L/D H~'~EE. ~TTEMPTED ~D~RERK C . ~ ~ ANNULS, BRaE I R~ R~GHNECE~ TH~N_ STR~$ O~ PP. CHAMG~ R~S . IN ~TA~ FR~ 5 1/2" TO S'.' UASHED A~O GRE6fiE~INS~OE OF STACE. R/D NISC ~,l~$_J..~ CELLAR .... ....... ,,, ,. .. ,, . ............ ~: "? ; , ,. , . , , · ,. . . ~ ,. ,',; ,: ~)_. _. , '1 [,,,~ -.~ , ,. . , , , , ., ...... _., , ., ~ILY ~LL ~T$ ~ ~ 3~27 DAILY ~S &~ ~ Z0~17 S,~isor: LHL APR L:~ '96 05:4BAM SHP DRILLIMG MOC P.2×E I~ATE-- ~ IIlG 122D _ _ CONTRACTOR DC~m'NTI#E.____ CUlq "IA.50 hr's, DATE OF LAST BOP TEST*- 0~/10/96 MIND DIRECTION*- VELC~ITY __ __ __ BARITE 262 LIsld UAVE PERIOD ROLL CNT. ~EAT Used ,., PITCH ____ NEAVE CNT. BLE~ Used BARD. HEAD ! ItdG .----. DRILL UATER Used · VOL ..... i., POT LIRTER Uoed ...... FUEL Used PERSONNEL DATA; HOC 1 POOL #I 1 RGK 3 _. i , ,,, ~ GAS to TOTAL: 2] COOPER CONNECT lO~ GAS TRIP GAS to --- , , ,,, SLOU ~ RATES TAKEN i L __ _. ft. ~i' PLOP NO. ~ SR~ ..__... a .-- S~ ,?~:.,?~:?::~?.~:,,..~,:.. :'.:::~::::..:,,:..::?.,:::BHA/::~BER?:..?'i:i::'':'.~i;.?'?;:;.;?':i'''i:::':':':::'''.:''?.~' SRCP a __ SPI4 /" '~':'gEsC~'~P~IoN''' ( ?: ~:.'::'..!'.i:;?i'~',i ,::: :' ~. :. ;?~::.?:':':~X~'~.':: .Io ,.::'::,!,'.;,x':::";.LENG ,~ .... PI~ NO. Z SRCP~ i ~ SP# SRC~ g .._ SPN ..... · ,mi _ _ SHALE DEN: PORE PRESS: ..... , ,, ~ ..... ,. ANCHOR TENSIONS CIOOO Lbs) ,, · 1 .... Z. _ - ' $. /. .... .,.. 5. 6.. ....... 7 ...... 8. , - , , , , BALL JOINT .. mi ANGLE OF FSET D ! RECT ION il ,. ,, ,,m ACCIDENTS REPORTED LAST Z& HOURS: , - MAPLE OI~ INJURED .. ,,, EI4PLOYER : SOCIAL SEC. 140. : , ' .... T]HE OF ACCIDENT: ~ -- ....... TOTAL BHA LENG.T,H..: D£SCIElPT]OIi OF A~CIDENT'- HOURS ON HOTOR: SGl~ NO. -' · - HOURS ON JARS: SER IlO. HOURS ON DC:: . , , STATUS C~ ZNJURE~): HOURS ON HEVZ ~: ......... ....... .... . ;..;. :. :""' 'i;i i ".''' T/36 18.56 316,e~ 7039.65 2028.4,1 -2D06.95 2853.~,3 o.'r~8 7828 16.~ 316.75 7127.32 2048.~ -2026.02 2881.28 2.0Z2 ~20 14,.80 316.57 7215.87 2066.89 -2043,15 2906.:~4, 2.066 8013 12.~ 31;,.58 7306.21 2082.66 -2058.57 2928.29 2.3?? _ 8106 10.9~ _ $19,56 7197,2S 2O96.50 -20?I .53 _29.~?,2~ 2.156 8169 10.74' 321 ,,80 74,59,13 Z105.65 - zoo. 0.3 29~9,02 0.720 826t 9.58 320.60 7~49.68 2118.30 -2089.19 297~.'i5 1.282 KS~ 7.92 319.97 Z64,1,60 2129,19 -2098.22 2989.23 1.788 8~? 6.83 319.~6 7733.83 2138.32 - 2105.91 3001.13 ~ .17~ 8S4,0 .. '.5.33_ ~16.73 7~>A.3o z14,5.?o -zllz.A3, 3OlO.~5 8633 2.65 335.0~ 7~19.07 215o.~9 - -2116.30 ;30i7.29 3.156 8726 ~,88 16,01 8012.00 21%,21 -2116.79 3020.05 1.872 88~9 1.39 355.67 illO~ .97 2156.80 -2116.4,5 302~. .65 0.809 8912 1 .T/' 353.23 B197.93 2159.35 -2116.70 3023.63 9~o 2.25 .. 35o._oP .~95,~ 2176.6~ -z 119.31 30;~?_~8 o. NOTES: ~R 1D ~6 O~:~?~M SH~ DRILI~IM~ MOC P.1/~ :. :.:::~: ....... , ....... ..:,:,.-: ......... ..:,:,.~.:,,. :.~...:.:, .............. ....... ..~.. :..::,....,': ......... ~~., P~'~* .~.'.~... ** .~..~*.*~.. ~~ ................... :~.:,.,:~.,:.:::.::.:,'::.:':. :. .: :..~ ....... ~.::'~:~,? ?.. ;': ........... ; .................. ,.-:'-'.-.?;;.:;: '..'~ .':;' ......... '-.:-....; ,:,. :...:'.:;.; .:: ;.; :-'..... .............. :?. :'. ;, ::::,,:'.,:: ~',:..-.;.:'; ::.,.-;:,:~0 ~:~:::: '.' ::.:: ....................... ~'~:.':. ~ ..::' ........ ~?:':.-:~' '<~ '::' ~x.: :~ ,:; ................. II I II I ' I ' ' Ill ' ' . ' i * ' - ' I III I I I I I II I I I ~A~ ~119~ ~PT 53 FIE~ ~EA. CR~ ~LL ~E ~EA CR~_F~ I1 ~o .1 RIG ~E S _ _4~71000 DE~E~ T~ TyvEK -' ~ 5~0 P~ ~ AFE.NO. ~O~ ~TH C~) ~ C~) ~ F~TAGE ~ ~' . PRESEHT OP: R~MZ~G PR~TZ~ ~ ~SZN~ O.D.T.~O9 L~ ~SZNG S~ DEPTH ~ ft. SH~ TEST ~ PPG DAYS ~ L~TT~ LZH~ 1 O.D. IN~VAL - ft, SN~ TEST PPG DAYS S3N~ ~ LZU~ ~ O.D. ZNT~VAL __ ' ft. ~ TEST ~" P~ P~ED DAYS LZ~R 3 O.D. ZHT~VAL - ft. SH~ TEST PPG I i I i iii E~TI~ ~y: ~N LAYZ~G..DM ~TLL PIPE. HEA~. VT, ~ ORILL ~-~AR~._ R~ ~ STARTED ~NI_NG PR~TT~.~ING. i Iii I i ii i ii - i i Ii ~ ~ 8.~ V~S ~ ~ YP GELS~__ ~ ~ ~ HPHT VL h. 0 Pf~f~ i --. i _ mi ~ ~1 ---_ ~~ TOT ~ . PRES~__ T~ ~~ ANI~L DP DC ~T , i II I ii i . i. i IIII II i i ii dV: __ BiT PUSS~E DRY: , ~ BZT HP2 .. B~T HP/~: ~ ~ ~F ~. __ ~ ~: . - PI~ UP ~. ~ T~E: ~ ~:QO 07:00 1.00 REPAIRED HYOR~.IC H~E LE~ ~ IR~ ~--~GHaFC[, (~ORm~E TQ~} C OT:OQ ~:30 1.50 ~H L/p DRILL PIPE C ~.:30 ~:~ 0.50 BEPA)RED DRAW[S FmT THROT'~LE ...... ' , C 09:00 10:30 1.50 ~H L/D DRILL PIPE C. "'DS 10~30 la:~ 1.jO REPAIRED_ HYDRAULIC ~E LEAK ~ Xn~-~HNE~'. OPinE SPINNER) " C 12:oo iD:OD 8.oo P~ L/D DRZL~ PZ~ AND HEAVY VT DP, .H~E 6R~A~_S ~ ~ELLY. ~/D ' C OS .QC~S. ~LLn ~A~ ~VSHtNG. ' ~:OO ~:~ 2.00 R/U ~ATHERF~ T~GS AND ~T~. hA~r .... C pT ' 22:00 06:00 e.~ RE~D ~EETY ~ETTNG. RU~ 3 l/Z" PR~UqTZ~' TeG. R~BB~Y ~O EXTEl,ALLT C TR TEST TO 5~0 PSi.. AT 0~. H~ 1~ ~TS ~UH mT QF 171 TOT~,. . . II __ i i I .... i I II ii i ii i · i~ ' ' ' , i ,,, ,. _ ., III I i I I I i ii _ I ii . , ,,. .. -- .. __ , ., . ,. ,. , ~'- ]1 ~ , , . . ... . ....... ~r~ .-_ i .. , , II i ii i i ., .. ii DAILY ~LL ~TS ~51 ~S _33371~3 DALLY ~S Q?O ~ _ 2~ S~tsor: LHL i i i ii ii i i i APR 19 ~9~ 05:~8AM SHP DRILLIMG MOC P.~×~ II _ - . IBll DATE: 0~/19/96 RIG 1221) CONTRACTOR DOt~TIIdE_~O0 ~ 1~.50 hr~ DATE OF ~ST ~ TEST: ~ DZRECTZ~ & HT. - ~ITE Z~ U~ ~ PERI~ ROLL ~T. M~T US~ PITCH HEA~ ~T. BLE~ US~ ~O. H~ING DRILL ~TER Um ~T ~TER ~ ...... FUEL Ue~ ~R~EL DATA: ~ 1 ~ 17 ..... ~~ ~s to TOTAL: ~ ~ATHERF~ ~ ~ER 1 ~ECTtN ~5 to TRZP ~ i ~ ~ ~TES T~EN ~. ~t. SRCP ~ ~ ~ SPH ':'::.~,T~L?DTS~IPY:T~'..'.:,':,c'.,',..~...~;~?: .'.:: :':.?.~,.:':~: :':..'".X.::,:'?~Z~i~_:,~,:~ .'.'~.:'.:,LE~TH,: .... ~P NO. 2 SRCP ~Cp ~ ~ ti, -., S~LE DEN; ~E ., . ,. ,1 . --. , , ,, ,., i i i , . · i ,,, 5. , , . . ., i .,, --. ~LL JOINT .... ,, ~GLE OFF~T DIRECTI~ ., i i , ,. ,, i A~tDENTS RE~T~ ~ST Z~ H~S: ......... ~ OF JKJ~ : .......... E~L~ER : .... ~ZAL SEC. ~. : ..... TI~ OF ~]DENT: ~ ,, ,, ~OTAL - nHA LENGTH: DE~IPT]~ OF ~CZDENT~ i , ~ , H~RS STATUS OF INJ~ED; ~S ~ DC: ~ ill Ill H~. DEPTH ., ANGLE DI~T]~ T~ ', .... N/S _E/U VE~T,, ~C._ O~ L~ ~ 18.56 316.~ 7039.65 20~8.41 -2o~.95 ~.~3, 0.748 ~ 16.~ 316.~ T1Z~.32 2~.~ -2026.02 ~1.28 2.02Z ~ 14.~ 316.57 ~15.87 2~.~ -2~3.15 ~.2~ 2.~ 8013 12.~ 31A.~ ~.21 2~.~ -2~8.57 ~.~ 2.3~ ~1~ 10~91 ~19.~ .,. ~97.~ .,2~.50 -2p[~.53 ~T.24., 2.~56 BI~ 10.7~ 3Z1.~ 7459.13 2105.65 -ZOO.03 ~59.0Z 0.~0 ~1 9.58 3~0.~ ~Ag.~ 2118.30 -2~.19 29~.~5 1.~2 ~ 7.92 319.97 7~1 ~7 6.~ 319.~.' ~.g 2~.32 -2~05.9~ 300~. ~3 ~.~ ~5~0 5.~_ 3~&.~ ~26.3o 2~5.?o -2~3 3o~0.~ .1.65~ ~3 2.~ 335.~ ~19.07 2150.'~ -Zl16.30 3017.29 3.156 B~ 1 .~ 16.01 ~12. O0 21~.21 - 2116. ~ 3020.05 1.8~ ~19 1.39 35S.67 81~.97 2156.~ -2116.&5 3021.&S 0,~9 ~12 1 ,~ 353.2~ 8197.93 2159.35 -Zl16,~ 3~.~ 0.~15 ~I0 2.~ 350.0q .. ~,62 .... 21~6.6~ -2119~3J 3037.~ 0.~9 NOTES= _ ...... APR 18 '96 05:~4AM SHP DRILLIMG MOC P.l/2 C)ATE 0A/18/96 RPT __~ FIELD COREA CREEIC tdELL HAHE CC~EA CREEK FET) #1 No 1 RIG 122D ~FE $ &271000 DEEPEST TAIIOET TYONEIC ;) 5700 PTVO ~;~)00 AFE.NO. 6600695 C)EPTH (PLO) ~ (TVO) 8873 FOOTAGE HOURS PRESENT OP: POOHa L/D DRILL PIPE. LAST CASING O.D. ~ LAST CASING SHOE DEPTH 9688 ft. SHOE TEST PPG DAYS ON LOCATION 52 LINER 1 O.D. _ _ INTERVAL _ - _ ft. SHOE TEST ~ PPG DAYS SINCE SPUD LIktER 2 O.D. INTERVAL - ft. SH[]~ TEST PPG PROGKOS£D DAYS LINER ~3 O.D. fNTERVAL - ft. SHCE TEST PPG EXECUTIVE SUPIqARY: PUI4PED DOUN SURFACE VOLt,I4E. CLEANED PITS. D.tSPqrACED ~ Ii( HOi, l~ Id! Fl~i~Sp t~ATI~F~, TPq~N t~ATER HITH POOH. L/D DRfLL PIPE,.. ..... . ....... ~ii i i ._.-.. . im. i .. JquI) ~ 8.5 VIS ~ PV YP GELS _..../__ pN 8.6 ldL HPNT ldL Pm 0 Pr/Hr / CA 1TI)DO Ca &O X Oil ~,SOLID$..~. BENT/SALT / 5.~ DRILLED -Z3,~3 BARITE 2~.3 (Lb/bilL) sPN #1 50 sPI4 dl2 TOT SPI4 ~iO PRESSURE. 1300 TOT Glqq 214 ANN VEL DP ~.20,6 DC 390.0 CRXT ..... . _ LIII I~ I J..I __1 i ii i.i~lM~'. :;.;ELI.~.r~: ,'._,','~1[2i~:~; i.i~.~j:isYDiii:~'i:i';:~'::;':?' ;'iSEl~TA£ i~O ...... ,.;'.: JBT (321 g,) ~_.' "~-I;G~,Ti.~: '~ #OURS':~',:{,'~T,:tWR,:~:: ',:~0;~:?:, ',F~,'~ :0:,' ;D;':;':',L':.:": ;,' O-: '::GE:' :,S.~: 22 I&RR2 6,000 GT-q-1 I;~XA 22 1,50___ 14.66 9580 2 2 taT A ~_ Zi 14RR 6.QQQ ~T_S_-__~ C/FteXA... 9591 ._20 1/, &..OOO .GT_S-1 .... C~&&XA 3 0.50 6.00 95~1 1 1 UT A I TD ,JV: . BIT PRESSUItE DROP: ~ psi BIT XP: BIT HP/{nI: ~ ROTATING STItING I,,'T.--. BHA 1dY. IN Ig. JO: 27' RPH: - SLAC3C OFF h'T. ~ W08: ~ - PSC:IC UP 1,ff. 190 TORQUE: ~ , 06:00 08-'00 2.001 PUI4PED SURFACE VOLUI4E DC~N. TAKING RETU~$ TO A~GER P!.1'.. . ..... C C.F -- 08:0G [1SRO0 7.001 CLEA#EO PITS. FI. USHED THROUGH A~INF.,.S, . . C __ O_T . . :JS;_OOI20:O0 _5.00 FILLED PIT~ UITN FRESHUATER. C 01' 20;00 2~*.;30 1.50 DISPLACED HUD IN HOI. E ~ITH FRESH UATER UNTIL i;L]EAN. BY RE_Y~..~E.ZN_G, C CT 2i;~0 !2~:00 ~,50q J:ILLED PITS UITH FRESH 1dATER AND #tXED tdITH 31f, ECL. C OT :~/~:00~02.::30 .2,50 ~REVERSE CIRCULATED SAFE KLEEN PILL THEN 32 ICCL UMITL RETURNS CLEAN. C ,CZ 02;:30 06:00] 3.501 HELQ PRE JO9 ~AFTEY ldEETING .... PC)OH,_L/D__ 3 1/2u DP. C DS ..... . ......... ,,, , , ,, mi. ..i , , i i ,, · · ,., , ,, ......... . . . . ~lC'ql, , ',' : ,,, :i., ~' , ._ _ · ..... .......... ~_'~ £" mi ,.~, , t, ',', :',,~ i ~,5 i~',.:'';/.,',''i':''i!' ... ;,' ,,,,;;,,,;,. ~:'~,il< ;;; ,!.,,;'% t :,, . ,. . ~ ,, DAILY QII~LL ~S ~1~ ~ 330~57'Z DALLY )(UO$ 6~7 ~ 205112 S~isor: LHL iii ~ mm i , ~ lB 'g6 05:2GAM SHP DRILLING MOC P.2/2 __ ~T[I 0~181~ RIO ID C~TRAC~N D~TIHC ~ 11.~0 h,. ~T[ OF LAST ~ TEST: ~/10~ VZND DIRE~I~: ~L~ITY - __ ~ BIRECTI~ & HT. ' ~IT[ ~ Us~ ~ ~ PERI~ R~L ~T. ~AT Us~ PITCH H~ .. ~I~ ~TER U8~ , ~L ~L ~ ' PER~NEL DATA~ ~ 1 "' .~ 1 ~~D ~S __ tD ~TAI: TRIP ~$ __ to .... . . ~L~ UP RATES TKEH i P~ NO. 1 sR~ n s~ ?~::?~:~:~:~.~?~?~:~;:~::.~:`~21}~>~:??:?:..~:~?~.:~:~d~? ~,o. z sn~ o -- ~ 1 BIT 6.o~ o.~ SR~ ~ -- ~ 1 CSG SCRAPER ~.~13 1.6~S -- 1 BiT ~B - - &.~O 2.250 2.~ i - S~LE DEN: ~E P~ESS: 18 STEEl. ORILL ~LAR ~.~ 2.~0 5.5~31 2& 3.5" ~.3~ H~P 3.500 ~.~63 ~C~ TENSZ~S (1000 L~) 1. 2.~ 3., .... 4. 5. 6. 7. 8.~ ..... ~LL dOINT ......... ~GLE OFF~T DIRECTI~ ........... i il ,,_ .. i. ACC]DENTS RE~TED ~ST 2& ~s~ , EHPL~ER : ...... ~IAL SEC. NO. : TINE OF ACCIOEMT~ , - ............ ~A~ BHA DES~IPTI~ OF ACCIDENT: H~RS ~ ~T~: SER ..... ~-- H~R$ ~ JARS: SER NO. STAWS OF I KJ~ED: H~S ~ DC: H~S ~ HEVZ ~: ,,. HEA...DEPTH ANGLE OlRE~TI~ T~ N/~ E/~ ., ~ ~R~_. ~SEC .... D~ L~ ~6 18.~ 316.~ ~9.65 2028.~1 -2~.~ ~53,&3, 0.748 ~ 16,~ 316.~ 7127.32 2~8.~ -20~.02 Z~1.28 2.0~ ~0 l&.~ 316.57 ~15.87 2~.~ -z~3.15 2G.2~ 2.~ ~13 12.~ 31~.58 ~.21 2~.~ -205~.57 292B.29 2.3~ 81~ ~.91 .. 319.56 ~97.~ ~.50 -Z0?1,53 ~7.2~ 2.1~ 81~ 10.7~ 32~.~ TLS9.13 2105.65 -2079.03 2~9.02 0.~0 ~1 9.58 ~0.~ ~9.~ 2118.30 -2~. 19 ~ 7.92 319.97 ?~1.6O 21~.19 -2~.~ ~9.~ 1 ~7 6.~ 319.~ ~.~ 21~.32 -2105.91 3001. _ _85&0 5.33 316,~ ~26.30 214~._~_ -2112..~3 3010.~ 1.651 ~ 2.65 335,~ ~19.0Z 2150.~ -Z116.~ ~17.~ 3,156 B~ 1 .~ 16.01 8012.00 Z15~.Zl -Z116.~ 3020.05 ~ .8~ ~19 1,39 355.6? 81~.97 2156.80 -2116.&5 ~21.65 0.~ ~12 1.~ 353.~ 8197.93 2159,35 -2116.~ ~.~ 0.&15 KIQ 2.25 ~50.~, , _ ~.6~ _._ 2176.62 -7119.31 3037.~ 0.~ I III I IIII I I APR 17 '96 06:2BAM SHP DRILLING MOC P.1/2 i ' ! '! ' " DATE 0/./17/96 APT ~ FIELD ~EA CI~EEK BEll IIAINE ~E~ ~REEK F~ el ~0 1 RI~ 12~_ AFE $ ~10~ DEEPEST T~T TYO~E~ g S~O PT~ ~00 AFE.~. ~ DEPTH (~) ~ (T~) _~ F~TAGE H~S , PRESENT ~: ~U T~ CIR~LATE. ~ST ~SING O.O. 7.~0 L~T ~NG S~ DEPTH ~ fi- SH~ TEST__ P~ DAYS ~ L~TI~ LZNER 1 O.D. _ _ ZNTERV~ ft. S~ TEST ~ DAYS SZN~.~ LINER 2 O.D. [N~RVAL --- - _ ft. S~ TEST __ P~ PR~~ DAYS LZXER 3 O.D. INTERVAL ' - . , ft. S~ TEST ,, _ .,~ E~T]~ ~Y~ CZR~LA~ A~. ~. pRTLLED RETAINER A~.C~HENT ~R~ 9~' TO 9~0~, ~qAS~ RETAINER JUN~ TQ C~. TESTED ~SZNG TO ~QQQ psi. ~PED SLUG.. P~H. L/D JUN~ BASKET .AND p/u SCR~ER. RIH TO .~'. R/U _ T0 c I R~LATE ~,,,. .. , ., · . ~ .., .,, ,. m. ~ lO.5 vzs~ ~ YP 8 ~LS~~ pK ?,5 ~ 15 HPNTUL~ ~ ~ Pf~tO.3/~ Ct 31~ h ~o z Oil ~~ ~LZPS 1J BENT/~LT ~~ 9~1 DRILLED 155.~ ~RITE -Z8.9 (t~L) .... S~ fl 50 ~ ~ T~ S~ S~ ~ES~E ~ TOT G~ ZI&, ~N VEL DP 220,6 DC 3~.0 GRIT ZO 1~ 6.000 GTS-1 C~ ~ 0,~0 6.00 ~91 1 ~ _ ~ A ~ TD JV: __ lIT PRES~E D~ ~ ~i BZT HP: BIT .... PZC~ ~ ~- ~ T~E: ]50 . 14~00 16:~ ~.00 DRILLED RETAINER'.'F~_~298' IQ ~00, AgO CEHENT T~ ~O't._ ' C DP c TR 16:00 17:~ 1.00 C~SEO RETAINER JUNK TO ~ ........ _C CF 1~ 18:~ 1.00 ~, - 18~11~30 I.~0 ;E~T~D ~RFS TO ZI~ ps~. BLED TO ~ ~S~..~N__~O ~[NS A~ HELD. C. 19~O~ZO;~g, 1.~ CIR~LATED AND ~PED SLUG. 8L~ P~H LINES. ,, , , C CF ZO:]o Z~=og 3.50; p~ .... c 2&:OO 02:30 2.50 .~.~iTff BHA. l/O dUNg BAS~T AND g~ S~Bz RIX glTX R~. C BH ~2;~_~:00 3,50 RIH TO ~t. R~ TO CZRC ..... C TR ........ , ,,, ,, .... -- .... ,, ,, ,,,, . , , , · __ ~ ,., , ,,,, , ........ , ,,, ,.~','~:~ ,,. ,,, --~ , .-.,, . , ,,, . .~, ,.,, ~, ,,., ~ ;? ~"~ ,,. ........ , , ,, ........ , ~ 17 '96 ~6:E~gAM SHP DRILLING MOC I~ATE: 04/17/~$ RIG 1_22~ CONTRACTOR DOWNTIHE_ CUIq, 11.50 hrs ~ ~ ~T ~ TEST: ~/1D~ W~ ~CTION: ~L~ITY __ __ ~ DIRECTI~ & ~vE P~I~ ~. ~AT ~- PITCH ~ HEA~ ~ LL ~TER ~ ~L _ ' ' Hi 1 ~K 1, T~IP ~ __ to , , _ ~ W bTES T~N · ft. MNO. Z ~CP G ~ S~ 1 BIT 6.000 O. ~ G -- S~ 1 CSG_~CRApER &.~ 1.~ 3.12 __~ .... I BIT mir 4.~0, S~LE DEN: ~E PRE~: lQ STEEL O~L' COLLAR.. &.~O Z.~O ~53.31 .. ~ . _24~,5" 25.~ ~P ... 3.500 2.~3 . ~.~ ~CH~ TEKSI~S C1000 L~) .... -- - ii i ~, ' 5.~ 6.~ . ,, 7 ..... B.~ - - .- ' .... ' ii ., , GGLE OFFSET DIRECTZ~ ' ' i , . , . ~tDENTS RE~TED ~ST Z& ~S: ~ OF ZNJ~ : ...... ' ii ii ~ER : ....... " TINE OF ~IOENT: TOTAL_BHA -.. .... -- - H~RS ~ DC: STATUS OF IN~D: H~RS ~ HEVt ~: ........................................... ~......~..: .... .,::~..':..::v.' :~ :~..~::~,:~:~.~:~..~2~::..:~::~..~.'. . '~:'~:'..~..~::?.'.'.~?:'::::~:~?..~'::: '' ~'O. IRECT~A~'.'.~R~ '.~?'.":.'..:'.'..,...:...: ...:~ ........ .. ~: ~ :~....~.~:~ .:-/~V.~.;'.':-:::..-:'.:-..'~.~?: .~%~?~'~`~.:~.x<~:~:.~...~.:~.:~`;~:~.~.~:.:~:~:~.`;~.:.?.~¢~:~:.:~:.~`~.:~;.~.~..:.~..~...- .'., ,,'. ..... ', ' .... .'.'""4", ' ' . d~.' d ,,,, ,,.>...,:'... .... .:. :,.',..,:.:;,.:;;'Z.,,':" · '" ,::' , '." '.','.'",. ;': ~ ~GLE ~-- ~ ~~ ~RT- ~ 18.56 3~6.~ ~65 20~.&1 -20~,95 2853.~3 0.748 ~ 16.~ ]16.n 7127.~ 2~.~ -20~.OZ ~1.Z8 2.~Z ~ 1~.~ 316.57 ~15.8T 2~.~ -Z~3.15 2~.2~ Z.~ ..81~ 10.91 ~19.56 .... ~97.Z5 ~.50 -20?1.53 8169 lO.T( ~1,~ ' ' 7~59.13 Z1~.65 ;20~.03 ~59.~ 0.~0 ~61 9.~ ~.K ~49-M 211B.]0 -2~.19 ~.15 1.2~ ~ 7.~ ~19.97 7~1.~ 21~. 19 -~8.~ ~T. 6.~ 319.~ ~,~ 21~.32 -2105.91 3001.13 1,1~ 85L0 5.~3 __.316-~ ~6.~ 21~5,~ -ZllZ.G3 3010...~ 1.651 ~3 Z.65 ~.06 ~19.07 Z150.~ -2116.30 8~6 1 .M ~6.01 M 12. O0 Z1~.21 - 2116. ~ 3~0.05 1.8?2 ~19 1.39 355.67 ~1~.97 Zl~,SO -2116.~S 3~1.65 0.~ W12 1.~ 353.Z3 8197.93 2159.35 -Z116.~ ~.63 ~10 Z..~. ~50.00 ~.62 ,. Z176.62 -~119.31 3~37.M 0.~ IMOTES~ APR 16 '96 06:46AM SHP DRILLIMG MOC P.1/~ DATE 04/16/96 RPT 50 FIELD COREA C2EEE UELL HAllE CO~EA CREE[_~ED ~! ~1o 1 RIG 122D AFE $ &;~710(~0 DEEPEST TARGET TYONEE ~ 5700 PTVO 9000 A¢£.110. 660069~ DEPTH (KD) _~ (TVD) ~ FOOTAGE -- HCURS PRESENT OP: ~]]~I;ULATING A#O UOC. LAST CASING O.D. ?..000 LAST CASZ#G SHOE DEPTH 968~ ft. SHOE TEST ~ PPG DAYS 011 LOCATION :50 LINER 1 O.D. INTERVAL ft. SHOE TEST PPG DAYS SINCE SPUO 50 LINEii 2 O.D. IHTERVAL ft. SHOE TEST PPG PROGNOSED DAYS 40 LINER 3 O.D. IIITERVAL ft. SHOE TEST PPG ..................... EXECUTIVE SIJI~IARY: RIH WITH RETAiNeR ON E L?IIE. ~ET RETA~NffR AT ~IE88~ 14LH. Pd~H AND DP. TAGGED R£TAI~I~R ~T 9:["9~ @PH~ -qOUEEZED WITH 20 BBL~ OF 15.8 PPG CEI4EIIT. REVERSED OUT. POOH. p/1J BIT AND ~UNI( RASXET. Rig TO g288~. CIRCULATED AND UOC. NUD gT 10.6 ViS 65 PV 10 W' 1½ GELS ..~51 pH 10,~ UL 1--0 HPHT gL-- P~ .,.1. Pfmf 0.3! 2.0 C1 __~)OO C~ .~__8~0 Z Oil 2SOLIDS 1--9 BENT/SALT 12.5 / 8.6 DRILLED 167.7 BARITE ~ (Lb/bbL) .......... · ::~U,#!! ~.~,~:.T.~ !:i'sLz~.i?] ~! ::!'..:?:~ .m/:::~!i :~:~i {St.~.~i-.i~i~O~i~_.:~? :~:~_~T.~,.~a:,.,_S.):~.:.i~ ::.;F_E~:7.~:_~:.~ Z1 1/~RR 6.000! GTS-1 C~XA ... ___20_ _lt, 6..000 .GTS.-1 - -C4~XA _~_ 0:50. ..6~,0_0 9~.91 1 I ~r & I TO 19 I~RR ~.~Og ¢-L~q. RG ' BJ~OQ :1~ 1~ 1+ dY: BIT PRESSURE DROP: .------- p~l BIT HP: BIT liP/in2: , ROTATING STRING UT. BHA UT, IN HUO: ~ , SLACIC OFF IdT. ,,,, VIGB: -- PIO( ~ IdT. TOROUE: "-~ ......... .~ Z- , ..... ---,i, - ' 06:00109:00 _]:00 .._,q~H__AXO.51E_¥ RETA!#ER_~A~T ~2~t~O'__I,I~_H;.__~_I~)H__~A~_NQ_R/O_$CHLUHSERGER. C CII _ ~r~a, OpH. 12:00 1]:00 1.00 SPACED OUT AND R/U TO CIRCULATE. . ............... C OT 13:o0 1~:oo 1tO0 cmj~ uff~D S~T¥IPR~.7~9 ~ET~G. C l&:00 1/,:30 0.50 R/U O0~LL. BJ~(E CIRCULATION, BROKE C~RC THRU C~OKE. TI~$TED L~NES C CN ..... _TO SOeO~Z. _S~Nr- I~. E!R.OF 1 aP_~ ,T 2frs PSL_~D 1.s sm aT ~ .. ?s~. sTt~G OUT. 1/~.'~0_ tl5:~0 _._'L.__O0 CIRCULATED MILLE H~X~NG 20 BBLS(IOO_SK$)_OF 15.O__PPG_CEHENT ......... C CF 15:30 16:00 0.50 PUMPED 5 BBLS KCL DATER, 20 BBLS 15.8 ~ CEHENT~. 5 BBLS KCL UATER AND C CN ., Tqm ~ ~J~- ~mll, 16:00 19;00 ~.00 STUNG IN AND 5_qU~Z_~I)__~O_JlP~L$__OE Cr.H~NT B[LOt~_.L~ETAI[(ER., PEJ~_(LR~D (: (;ii HRS. RETJUNER HELD. 19:00 It:00 ;~.00 kEVt~K-~E ~KCULAYFU im(ee up, VULUF~eS. 15 uaL-~ u~ CLaIIARINA'IeU FlCU~ 'IU C CF."." · SLmlFACE, r 21:00 21::30 0.50 R/D FRITH CEI4EIqTZI~Gt ~t. 1~1,1 I~t~Ral I,~[HfS~ C OT 21:30 01:0D 3.50 POOH. C/9 STI#~;ER~ C TR 01:00 02:001 1.00. #/U BIT AND ,IUNIC' QASX:ETr RIH 'alTH aHA. C 02:00 05:00i _3r~00!.. RIN TO 9288~ ........ ~ !~ C TR , ~:~. ~'~' C lac 05:00 06:001 1.001 CZRCULATED I~HI~E UOC~ : ,, ..,,.,,",,, ,,..,!: ,. ................. ,, ,... z~ ,'~'% , , i i. ~ ................, . .',:, :.i/:', ........ , '"" !i., ~';'':''' i'",,,,',","r~:-"," "' ',,',,,.,: ,i"~ ', '., '~.,"~ ', , ........ ~ ' ""' 'it ri~' ",'~" "' "~ ~"" , , · ,, ~PR 16 ~96 06:~?AM SHP DRILLIM~ MOC P.2/2 DATE: ~ RZG 12~T) COHTRJ~::TO~ DOUNTIPSE CLW4 11.50 hr~ ~ DZ~I~ & HT. __ - NZ~ ~ ~VE PERI~ ~T. ~AT ..... ~ PITCH ~AW __ ~JLL ~TKR ~ ~T ~TER ~ ~ PE~UEL DATA: ~ ~ ~ to .., T~A~: 26 ~HL~B~ER ~ ~ 1 ~CT~ ~ . to .. D~LL TRZP ~ ~ to__ ~CP 8 __ S~ ~CP O S~ 1 JUK ~S~T &.~o 1.5~ 3.4o ............... -- --- - I BIT em' ~,~Q ~.~O 2.~ S~LE DEN: ~E PRESS: .... lQ ~TEEL DRILL ~O~AR ~.~0 2.~0 5~3.31 ...... 24 3,5" 25.~ ANCH~ TENSZ~S (1000 L~) . ..... 5. 6.., ~GLE OFF~T DIRECTI~ -- " . .. . ~[DENTS RE~T~ LAST 2~ ~S~ ~E OF %NJ~ : _ - ..... ~L~E~ : ...... ' '" ~IAL SEC, NO, : . - TINE OF ~CZDENT: TOTAL BHA LENGTH: 1~.~9 '- -- ~E~tPTZ~ OF ~CtDENT: H~S STAT~ OF ZN3~ED; H~S ~S NE~. DEPTH P~E OTRECTION T~ N/S E~ ~RT. ~C. D~ L~ ~ 18.56 316.~ ~b~.~ ~.41 -20~,~ 2~3,~3 0.7~ ~ 16.~ 316.~ 7127.~ ~.~ -20~.~ ~0 1~ .~ 316.57 ~15.87 ~.89 -2~. ~13 12.M 314.58 ~.21 z~.~ -20~.57 ~.~ 2.3~ 8106 10.91 319.56 ~97.~ 2~.50 ,, ;207~_. 5~ ~4~- 2~ 2.156 8169 10:7~ ....... 32~.~ - ~ ~59.13 2105.~ -20~.~ ~9,02 0.~0 e~ 9.58 320.~ ~9.~ 21~8.~ -2~,19 ~.15 1.~2 ~ 7.92 319.~ 7~1 .~ 21~.19 -2~.~ ~9.~ ~7 6,~ 319,M ~.~ 2~,32 -2105.91 30m.13 1. QS~Q 5,33 316.'~ ~6.~ ~I~5.~ -211z.~3 301o.~ ~ 2.65 335.~ ~i9,07 2150,~ -2~16,30 3017.~ 3.156 ~ 1 .~ 16.01 ~12.~ 215~.21 -2~ 16,~ ~,05 1.8~ M19 1.39 355.6? 81~.97 2156.n ~12 1.~ 353.~ 8197,93 2159.35 -z116.~ ~oz3.~ 0,415 H~ES: i i iii ii ii APR 15 '96 OG:ZBAM SHP DRILLIMG MOC OATE ~/1519~ RPT ~9 FIELD ~EA ~EEK ~LL N~E ~a CREEK FED_~ ~o 1 RIG 12~ -- AFE $ ~2710~ DEEPE~ T~T TY~E~ - ~ S~ PT~ 90~ AFE.NO. DEPTH (~) ~ (T~) ~ F~AGE .. ~S P~SENT OP: RIH ~/RETAINER ~ST ~S;NG O.D. 7.~0 L~T ~StNG SH~ DEPTH 9~ ft. SH~ TEST , PPG DAYS'~ L~Tt~ LIME~ 1 O.D. [NTERVAL - ~ fT. SH~ TEST ~ PPG OAYS SINCE S~ L[~E; 2 O.D. [NT~VAL - ft. SH~ TEST PPG PR~ DAYS L]NER ~ O,D, INTERVAL ' ___ ft. SH~ TEST ~ PPG _ _ . ,., , ., . ~.. ~J- _R~ TO ~NT. ~EEZED S~ THIGH R~TAtN~R AT ~ ~I.TH~O BBL$ OF CE~T.._R.E~R5~ ~T. __~H. RAN CET/CBT FR~ ~.', TO 0~90' R1H A~ SHOT ~EZ~ PERFS FR~ 9~02' TO 9~OG'. RIH UITH . _~TAINER. ATTEHPTED TO SET AT.~280~, P~. C~E~ SETTTN.; T~. ~;H. ... .~. ,,~, , .., ., .. ~.. · ,, ,~ ,. ~ m 10.~ V2S ~8 ~ ~ YP ~ GELS ~ 2~ ~ 11.1 ~ 10 HPHT UL ~ Pf/Hf 0.~/ 1..6 ,. ~ .,.. ..,. S~ fl GO ~ ~ TOT SPH ~0 PRES~RE 1~00 TOT ~ 1~ ANN ~L DP 117.6 DC 117.6 CR[T , . . , .... ..... __ ,. , JVt BIT PRESS~E DR~: ~ ~i BIT HP; BET HP/J~; , . ,.... S~ OFF ~. ~: -- PICE ~ ~T. -- T~E: , , ~:oo o~.~o] ~,5o c~ ..... c ...... TFSTED LZNES TO SO00 PSI. STaG ,]~r9 RETAINER AND ESTARLJS~E~ ,,, INJECT~ RATE~.p~.,,,1 B~ AT 29~ PSt AND 1.5 BP,~ AT..~,ZPQ PS~. STUNG . -08~0 09.;~0 O,~O' BATCH .liEn 30 eeLS OF ~S.8..PP~.~NT. c C, , , 09:00 10:~0 1.50 ~_~ 5 BRLS OF UATER, ~0 9BLS OF CEHENT._~ BBL~ OF UATER A~o 2~ BBLS ~ --' .. OF ~, STUMG INTO RETAINER AND SQUE~ ~ITH ~9,5 eeLS OF ~T. ~, ~ES~E ~AS 2500 PSt A~ -25 B~..GtP AT 10AO HRS, STUNG ~T. .. ..... _R.ETAINER HELD. LEFT .5 eeLS OF CEMENT. OM RqTAJNER. p/u 10:I0 1~;~0 1,00 aE~RSEO ~T_ 2 DRILL .~E ~VOLUHES, CONT~tNATEO ~ AND TRAC~OF C CF CE~NT TO ~RFACE.. .......... - 11:30 11:00 1,50 ~PEP SCUG. BLE~ ~ LINES... ~LU~ED STACK ...... C CN 13:00 16;~0 ~,50 ~H A~ L/O STINGER..- .... C TR 16:~0 18L00] 1,~0 FUNCTI~ED AND FLUSHED'~ACE.' G OT ~ 2~:00~ 5.00 ~ SCHLUMBERGER AMD H/U CET/CeT. R[H AND. LOGGED FRO~ 9~90' TO ~0' .~. LN ..... ~H A~ L,/D T~LS ...... 2~tO0~ 02:30 3.50~...H[U LUBRICATOR. H/U S~EE2E GUN. RtH. PER&ORATED FR~ g~02' TO 9~' C ~F ~]TH 6 ~F. P.~ ..... ... O2:~O 06:00 ~.50, L/D ~M A~ M/U CEMENT RETA]NER, R]H ANO AT'TEHPTED TO '~ET_AT 9ZeO', C CM P~H, ~HECEED SETTtNG T~L AND RXH UI.T~ R~TA]ME~r _ i · .., ... ..... ,., _ , .~ .',' , '. '~ :':,,", '~: L ,., ,. ,. ..... ,. .,~... i Il ,, ,.. Il ., .... ~',, ....... ,., ~',. ~*,, ._~ . i ,.. i ..... . "' . , ....... . ........... . --..,, ,, ,, ,;' ,~,, ~ ~',,',.,'~.~.~.',:','~' , "' :'~: :L,:~'.,, *-"' * ' "~---- ' DAZLY UELL COSTS 45118 CUN$. ~0~7000 DALLY ~ 71~ ~?~?::?:~ S~rvisor: P~e ... i i ii i / ~ 15 '96 06:84AM SHP DRILLIMG MOC P.2×2 DATE: 04/15/96 RIG 1220 CONTRI~TC)R C)O~TI~ Cl.~~ hrs DATE OF LAST BOP TEST: 0/,/10/96 I~IIID DIRECTZON: V~LC)CITY __ __ - -- -- ~V~ DIRECTION & HT. BARITE ~ u~ed 20 I,IAVE PERZIX) ROLL ONTo lIE. AT , . UdQed ~ PITCH HEAVE CNT. BLEI~) - Ul~d BARO. #EADING~ DRILl. laATER Used VOL ,, ... POT 1,lATER Used PER~NNEL DAIA: ~ 1 POOL 1 FUEL Used HZ 1 R&K 1 , iAClCGRiXJIID GAS to ~ TOTAL: ~ SCHLLI4BERGER ~0 ~ COiKECTION GAS ~ to DO.ELL 3 TRIP GAS ___ tO NAX. GAS , pi II SLOIJ PlJ4p RATES TAKEN Ga ~t. , ..... .~..~.~.F~i.:.~.::i?::~:!:~:;~...:i/~::~?:!.~HA~.:.:m~N8ER~`:~)~!i:i:;~}..:..::~?:...!~F...:~.:i.:?~.:~:::~i...:.:?.~!:;.~. UP ilO. 1 SRCP .____ Ga __ SPN SRC? B __ SPfl i~i!.iT__d~O~:JOESCR~PT'IM!,'?:?'~':~:::'~ ~':'''' ,',":~:~'~':-~'::OO'!'.:!:'i:.':-X ~.~:"i'~?'D' ~:'~:~':: ?'X' PUNPNO. 2 SRCP B ~ SP~ _ . .. SRCP . .__ ~ ~ SPH ... iiii SNA~E DEH; PORE PRESS; , " . i ANCHOR TENSJOliS ¢1000 Lt:fJ) . . , 1. 2. ____ -, -' ' 3. &- ' .... ' " 6._ ...... .. ". T. B. __ - ...... ii i i ii RALL JOINT , ,i __ __ ANGLE OFFSET DIRECTION .- · ii i ,.. .., ., .. AJ:CIDENT$ REPORTED LAST :)& KOIJRS: - ,, ' NAN~ OF INJURED : ,,, ' .... __ · , ENPLOYER : .- . - SOCIAL SEC. NO- : -- - ---- TINE OF ACCIDENT; '' ~_~oT~'L BHA LENGTH:,, i ii DEScRiPTIoN OF ACCIDENT: KOURS ON MOTOr: SER .... -- fl~UnS O~ JARS: SER KO. , ,, HC)URS ON DC,' ___..___ STATUS OF IH,lURED: HOURS ON H~:VZ UT.' ~ · . ~ ~.~.***.,.....*.****.,,':',' *.: ..... .**, .~,:,**'.,*,: .... , ..:. ..!.,::. , .... ' ........... !'..'i :* ~..'*~': :".' '.~" **"..**~: **'ii~ ~i:.'. :' !':'*! ~' :!'i~'iiD'IR£L"TIC)~AL::.:!$URV~$ ..... ;'ii.*' *.:*' :'. :.!,ii :i ". ...... '?..' .": ...' ... i.:*:.:. ..... :71" '?' '.' *::~' :.' :': .' :" i :.',: :!'{ :.". i. ':' '~i i :' ..::. :" ~#Ai.' .A2Vt~m*H~ 5,0o... ~£A. DEPTH ~ D?~ECTtOH TW N/S____~~ ZaF..B 16070 316.~5 7127.32 2048.7'3 -2026.0Z 2881.28 2.022 ~ 79:)0 1/,.80 $1~.57 7215.87 206~.69 -2043.15 2906.2/, 2.066 8013 12.6/, 314.58 7'30~. 21 2082.66 -2058.57 2928.29 ;).377 {llO~ 10.91 _ _ ]19.56 7397._25 2096.S0 ~Z071.5~ 2947~_Z4 2.156 __ 8169 i0.7& 3Z1.80 7059.13 2105.65 -2679.03 2959.C)Z 0.720 8Z61 '9.58 32O.6O 75~9.68 2118.30 -Z0~9.19 2975.1~ 1.282 B35& 7.92 319.97 7641.6O 21Z9.19 -209~.2Z 2989.23 84<7 6.B] 319.86 773].83 2138.32 -2105.91 ]00~ .13 ~5&o 5.3~ ~16.T3 _~6.30 z1~5.70 ,, -IllS.&3 ]010.9~ 1.65~ 8633 "Z.65 ~).C)6 7919.07 2150.79 -2116.30 3017.29 3.156 8726 1.88 16.01 801:%00 Z15&. 21 -2116.79 3020.05 1.872 8819 1.39 355.67 8104.97 2156.80 -2116.45 3021.65 0.809 8912 1.77 353. ~3 B197.93 2159.35 -2116.70 3023.63 0.&15 .... 9~10 ~.~5 L.. 3~o.oo a695.,6z z~76.67 _ .-z~.19.31 3037.68 t~.o99 I~0T£$: _._ RPR 14 'gG 0G:BORM SHP DRILLIMG MOC P.1/2 ,mi · DATE 0~/1&/96 RPT /~ FIELD COltEA C~EEK UI~LL B~E ~ CREE~ F~ ~1 Bo~1 RZG 12~ :AFE S ~271000 DE~EST T~T TYVEK g 5~ PT~ ~ AfE.~, DEPTH (~) ~ (T~) ~ F~T~ ~S ~ESENT ~: CBU. .. ~$T ~$ZNG a.D. 7.000 L~ ~ING ~ DEPTH ~ ft, SG TEST LINER 1 O.D. ZN~VAL - fi. S~ TEST __ LIN~ 2 O.D. - tN~ _ - ft. S~ TEST . LINER 3 O.D. INT~AL - ft. SG TEST ~ES~[. ~H A~ R~, ~ ~UQRZ~T~ A~ N/U BELL NZPPLE. ~.Q~,,T9 LEFT STOE OF DEflate. ~AN 1N ,H~H RETAINER SETT]NG T~L. TA~ K[TAZNER AT ~'. ~ ....... ............. i i ii ......... , ~ ~ 1~ YXS 65 ~ 17 YP Z& GELS ~ ~ ~ ~ lQ HPHT CL 38000 Ca ~ 2 01~ ~ ~ZDS 2~ BENT/~T ~l~.Q /~ DRSL~ 1~.0 BARTTE -37.1 CLb/~L) m ,ill .... SW il ~ ~ .... TOT ~ ,, PRE~E T~ ~ ANN WL DP .............. JV: BIT P~S~E D~: ~ ~i BIT HP: BlT HP/t~: S~ OFF ~. ~ Pt~ UP UT. T~: ::~ ........ ;..~ ~,:.:.~..~.: :~ ~:: :., .~: :;:.: ~:. :.:~:::~:~E~T Y.~ ~ K ::~k~XCE,,_?. ::~ .::: ,~,.: ?.?:..:?.,:~ .~. ~:.,:~...:~ ? :~: ~..~.,.~ .................... : .............. . ............. ~.,,,~,:, ~t~113;~,_7~ ~TN]SH~ RUNNING,~ ~,~.. ~ ~P T~L~, C LG , , 13t~3 1St~ 2.50 C~G~ ~T BOLTS ~ LUBRI~T~ A~ N~., . P/U ~[TJCBT. T~S AND RZH C 60 ___ ~_O_~O~ '. TE~ L~T~ TO 15~ PSi 15t~~ {8:30 ~.~ ~IH ~ ~N ~T~T FR~ ~,~ !O.~.~' U~ER 1500 PSi PRES~RE. X~~KT IP L~. '~ ~ ~ TmLS ...... 18:30 ~:30 4.~ N/D L~RICAT~. H~ g~ NI~L[ A~ FL~ LINE ..... C BO 22:30 ~:30 2.~ ~D D~ILL ~L~S A~D ~P_ T~.EFT ~IDE OF DERRI~, C 8H ~:30 ~:30 ~ N~ RETAINER GTINGER A~ RIH UITH ORILL_~I.PE TQ~', g. TR os:~' ~:oo 1.5o R;H Pm DRZLL PTPC. T~GG~ RETAINER AT ~e. . C 05~00 ~;OO 1,004 SPA~ ~T DRILL Pl~. STATED EK AT ~0 fiRS. , ...... ; OT ,. , , . ,, , , ,, , ,-, . , a , ' ,, . , , , ,.,.. , ~ .., ..... r,, . , ' , ~?,"'"h ",~, .' ')''" ''~'' ";''""~ ''~ ' ~ ~ ~, "~/ ,,~.,~ /,. '' ~ '' ', .... .,. II ', '1' ' ....... ~'1','~ '~'',', ,,~ '. ' ..... . .. . .. DAILY ~LL C~ 1~9~ ~ ~O01~ DALLY ~ ~ ~ 17~65 S~*sor: ~ ........ I I 11 APR 14 '96 86:B~AM SHP DRILLING MOC P.2/2 I~ATE: ~ RIG 1221) CONTRACTOR DCb'NTII'~ CUH 11.50 hre ~AT£ OF I.AST BOP TEST; OA/IOM UZND DIRECTION; Ti~LOCITY -- _ ' __ UAVE DIRECTZOId & H,T. Mi--. Oil. BT '--'-"----- Used PITCH IIEAVE CHT. ILEND USed BARO. NEADING DRILL IlIA?El! UIId VOL PERSOIIN£L DATA,: NOC; :) POOL 17 FUEL LmIcl -- ~ GAS ~o TOTAL: 32 ~CllLLIHBERGER & #&ICO CONNECTIOII GAS to -- IXI,~LL 3 TRIP GAS to ¥ SLOU ~ IATES TAI~# I ft .... ~ .... :....~ ..... ~ .................. . .... :~. ~:~:~... :::::::::::::::::::::::::::::::: .::~.,~.. IqMP ND, I SIL~)' B " ~t4 :':~:::?:~Y~!:!,!.:: ::'::::::k. ~ :: ~:;.~'.~:i:~'.,4:.".u:'::i::: :;~BHk !t__Mr~4ff_ ER't::::::.;r.'.... :: :.:-..:.; ::::,:.::.':::'::.' ','.'"~ ~ .' ~' ,: .-:'. PiMP NO. 2 ~C~ II .__ 'Sim .............. SRC:P e _._ SPt4 __ i i , · . i SNALE DEN: .... PORE PRESS: . , · i I I I ANC:H~ TENSZONS C1OOO tbs) · m III 1._..._ ~. . - ..... 3. &. ,., $. 6 .... - 7. , 8 ..... i i ,~1 BALL ~OZNT ... · ANGLE DFFSET DZRECTZON ........ i, ...~ · i - . ACCIDENTS REIK3RTED LAST ~& NOLIBS: ~ . .... , NANE OF INJURED : - ' EI4PLOYER : ............... SOCIAL SEC. NO. : ........ TINE OF ACCZDENT: TOTAL ,BHA DESClIZPTICMI OF ACCIDENT: NOUIZS ON NDTOR: . SER No, HOURS ON 3ARS: ~ SER NC). STATUS OF Z#dURED: HOURS OI4 DC: HOURS (IN HEV! biT: ..... ~A. OEPT~ ANGLE DZK:TI~ __, TW N/S E/U VENT. SEC... 7822 16.70 316.75 T127.3Z ZO&$."~ -202~.02 2881.26 Z.07.Z 8013 12.64 31,r,.se 7306.21 2022.~6 .2o58.57 z928.z~ z.377, 8`106 10.91 31 g.. 56. .... 7397'. ~t5 2o96.50 - :~o?'t .s3 29~T. 2& . .2. lS6 -' 8169 '~b.?4 3~l.so ?¢59.13 2105.65 -:,029.03 2959.~ 0.720 8261 9.58 320.60 73&9.68 21 la.30 -2o89.19 2~75.15 8354 7.92 3'!9.97' T641.60 21~9.'~9 -:;K)~.~ :Z9S9.23 1.7'Ss IL&T 6.83 319J6 7733.83 2138.32 -2105.91 3001.13 I. 172 e633 ~.Gs ~.06 ?'f)'19.0T 2150.79 -Zt'~,.30 3017.29 :~.'t.~ 8819 ~.39 355.67 BIO/..9T 2156.~0 -2116.45 3021.65 8~12 1.77 353.23 8197.93 2159.35 -2116.?0 ~23.63 0.415 9410 2.~5 350.00 B69~.02 217&.62 -2119.31 ... 3037,68 0,0';9 dOTES: , · _ . · . ,..,, i i iiii ~R lB ~96 08:~1~M SHP DRILLIM~ MOC P.I~ i ! i i i i ill , · il. l· · DATE 04/_13/~ RPT .~7 FIELD COrnEA CREEK NELL N~E ;~EA CREEC FED ~1 Wo ,1 RIG 12~ _ DEPTH (~) ~ (~) 89~ FffiT~ Xmm$ ~ P~SENT ~: ~tNG ~P L~. L~T ~IRG O.D. ~.~ ~ST ~SING S~ DEPTg 9~ ft. S~ T[ST ~G DAYS ~ L~TI~ LI~E/ 1 O.D. ZNTERV~ ' ft. S~ TEST PPG OAYS SZU~ S~ ~7 LI~ER 2 O.D. I~RVAL - ft. S~ TEST PPG PR~~ DAYS LINER 3 O.D. ZNTERV~ - ft. S~ TEST _ PPG , . ..~,. . ... EXE~I~ F~ VSP.... P~ R~ A~ RtH ~ZTH ~ TAKING CHE~ SHOTS.. ........ ...... . .... , . . ,,. . , . ,,..., ......... ., i ..... C[ 3~ ~ 600 X Oi~ ~ ~LIDS-2~ 8ENT/~LT _14.0 / 10.~ DRILL~ 1~.~ ~lT~ ]~.8 .,. .. ~ ,,,. ~ gl S~ ~ T~ S~ ~E$~E TOT G~ ~N ~L DP DC CRIT ...... ,, ~ ,,-- , l llll JV: . BIT ~ES~lE Pl~: ~ ~i BlT HP: ~ BIT , ,,. , , . .. . ..... ROTAIING STRING ~. B~ ~. IK ~: R~: - S~ OFF ~. ~: - PIC~ ~ ~. T~E: ~:301~:~0~ Z.OQJ ~ gILL NIPPLE. N/U LUBRZCAT~. C LN ~301 10~ 1.50 N~ CET/CBT AND RZ~ TO. 10?.,..JEST[O LUBR~T~. "~NECTI~"LEA~ED. .... C LN 10;00" 16:00 6,OOI N~ LUB~I~T~. IN~ECTED RfNG GR~ES,. BOLT ~S ETC. HIC H~RIL C ~ ..... ....... RING GR~, LuBRI~T.~ .F~3HG~RING GR~ AND REPLACEHENT FLANGE RING GR~. ALL UZTNIN SPECS..N/~_LU_~ICT~, REPLACEHENT sT~S T~ SH~T. ~ILL C~AN~ ~T _AN~$T ~NNECTIOI IF I PRESSURE PASSIg RE. iRED. ~T/CeT I~LS. 01:00 :03:00 ~,~ RIH UITH D~I~L COLL~S TO DISP~ 300' OF ~ F~..~P L~. ~H. " C ' eH 03:00 ;06:00 3~ R~ ~HL~RGER F~ ~ L~. RtH TAKING. CHE~J~, C LO , , .... ......... - ~ , ,,., . ~ .-- , ., ,, ... ........... · ...,. ........ , · .... . ,, · , . ~, ...... . . ~-- ~_ , ,, , ...... ............................. :,, ,, .,.'~',',~ ..... ,.. ,, .,... , . ..:,'.'," ~, '4, ,;, ,, ,., ............... DALLY ~LL COSTS ~1501 ~ 28~19 OAiLY ~$ ~~ ~ _1922_~ S~isor: ~g . . .. . FPR 13 196 08:43AM SHP DRILLING MOC P.2i2 DATE: 047137% DATE OF LAST BOP TEST: 04I10/% BARITE used an. MEAT Used OR. BLEND Used DRILL WATER Used PDT WATER Used FUEL Used BACKGROUND GAS t0 CONNECTION GAS _ to TRIP GAS ,_ to - PAX. GAS SLOW PIMP RATES TAKEN .1 _ ft. PUMP NO. 1 SRCP : _ SPM SRCP a ._ SPM PIMP NO. 2 SRCP ,_- SPM SRCP _ D _ 5DM SHALE OEM: - PORE PRESS: ANCHOR TENSIONS CIOOO lhs) 1. 2. _ 5. 6. 7. �- B• - BALL JOINT AMCLE OFFSET DIRECTION ACCIDENTS REPORTED LAST 24 MOMS; TES NAME OF INJURED DAN CRAIC EMPLOYER:� SOCIALS - EC. 90. I.. n S r.c e21DFUT: tOf OD RIG Ing__ CONTRACTOR DOIMTINE_ CUM 11.50 WIND DIRECTION: VELOCITY _ WAVE DIRECTION A NT- --- WAVE PERIOD ROLL - PITCX HEAVE BARD. _- READING VOL PERSONNEL DATA: MDC 2 POOL NI 1 RLK TOTAL: 25 SCHLIRRIERGER 4 L' 1 DESCRIPTION OF ACCIDENT: ENPOYEE FELL FROM BOP PLATFORM AFTER 891M SPRAYED WITH MID LEAKIMC FROM LUBRICATOR CONNECTIDN STATUS OF INJURED: pu DREAD SORE SNOUI nr¢ rtw ¢ELEASEo FOR WORK. - - HOURS ON MOTOR: NDURS OM JARS: HOURS ON DC: • HOURS ON NEVI WT' SER NO. SER NO. DIRECT 101"AURVEYS F1 HAL A2 tMNTH PLANNED . 315.00 ..,, A ANULL. D tON 316.75 TVD 7127.32 M S E W 2048.73-2026.02 2881.20 2.022 7B2B T920 16.70 14.80 316.57 7215.57 2066.89 -2043.15 2906.24 2928.29 2.066 2.377 8013 12.64 314.58 7306.21 2OB2.66-2058.57 20%.50 -2071.53 2947.24 2.156 8106 10.91 319.56 7397.25 1 5-2079.03 2959.02 0 Slog 10.74 3 .SO 320.60 7549.68 2118.30 -2089.19 2989.23 1.282 8261 8354 9.58 7.92 319.97 7641:60 2129.19 •2096.22 2989.23 3001.13 1.788 1.172 8447 6.83 319.86 7733.83 7826.30 213B.32-2105.91 2145.70 -2112.43 3010.95 1.651 8540 5.33 316.73 3 5.06 7919.07 2150.79 -2116 30 0 7 20 3.156 B726 .65 1.88 16.01 8012.00 2154.21-2116.79 2116 3020.05 1.972 W19 1.39 355.67 8104.97 8197.93 2156.80 2159.35 -2116.45 3023.63 0. 415 5912 1.77 353.23 8695.62 2176.62 -2119.31 3037.68 00.099 9410 2.25 350.00 .5.44 2186.43-2121.29 6 9680 00 NOTES: APR 12 '96 06:45AM SHP DRILLIMG MOC P.I×2 DATE D/,/12/~ RPT && FIELD CCIREA L~EEK _ ELL NANE ~)RER CREEK FED ~1 No 1 RIG_1~_ .... AFE $ ~2~ DEE~ST T~ TY~E~ - g S~ PT~~ AFE.~. DEPTH ~'~) ~ (T~) ~ F~T~ ~ ~S ~E~ENT ~ R/D ~CHL~BERGER., ~ ~lIG O.D. ~ ~ST ~SING S~ DEPTB ~ ft. SH~ TE~ P~ DAYS ~ L~TI~ LINER 1 O.D. ~BTEYAL - __ ft. S~ TEST P~ DAYS SZX~ S~ LINER 2 O.D. INTERVAL _ __ - - ft. S~ TEST _ _ · PPG PR~~ DAYS UNE~ 3 O.D. INT~VAL ~ - ft. SH~ TEST . PPG .. .. ~ ,. __ RZH P~ DRILL PI~ TO ~e, pRZLL~ STAGE..~LAR FR~ 6~0.' TQ 6933~- ~-. R]H PIU DRILL P_~PE TO --~91' C~ TESTED ~SING TO.~500 PSI. BLED T~ 2600 PSI. ~. 5~T RETAINER ~.C L~HE AT ~71~ ULN. R/D E LZH~, ..... -- .--. . .. , ,. .~.. , ,. ...., , , ~ ~ 10.7 VZS ~ ~ 1~ YP ~ GELS ~ &1 ~ 8.~ ~ 9 HPBT UL ~ ~ Pf~f .~ l _ , .lira . , ~ Jl ~ ~ ~ T~ SPH 69 PRES~E 2~0 TOT ~H 2~ A~K VeL DP 2~._t DC &~.a CRZT ~ 1~ 6.000 GTS-~ C~XA ~ O.SO 6.00 ~9~ 1 1 UT A I . TO 19 13RR_. ~.5~ C-~RG .... ~JSO0 lA* 1~ 1~"; ..I ~8 13 8.S~-~LRG BJS0O.. 1~-1& l& 210 1~.~ 15.~2 9~B,Z 2 ~ ~ ~ t cT TD Jr: BIT PRES~E D~: ~ ~t lIT HP: BIT HPlt~: ~ m i i iiii J ilI ROTATING STRING ~, 115 BUm. tN ~: 2? Rm: K - ~ s~ OFF m. 1~ ~; --~"" - ~:OO l&;O0 ~.oo4 ~ZH p/~ 3 1/~' DRILL PIPE. TAGGEP STAGE COLLAR ~T 6930'. C DS -~ - *- ' C CF 1~:00 1.~:30 0.~0~ P~ KELLY.~ OR~E CIR~LATI~r .... .. -~&:~ 15:00 0.50 'DRIkLED STA~ ~LL~..[R~ ~30' TO ~33~. ..... C, O0 , 15:~ 1~:00 1.~. ~, ~, CF 16:PQ ..19:30 3.50 RIH P/U ~RILL P~PE ' "~A~O FL~T ~"AT ~91' C DS · - ' ' ' C CF 19:~0,20~0 ].00 P/U ~LLY ~KD ~, . ., - ~:]0 2~2~ 0.5.0 TESTED CASING TO ~5~ P~S[, BLED TO 2~0 P~_~N 10 ~'N AND NELD. ~ C PT - __16,2 PPG ......... ~1:~ ~Z:OO ~'~ ClR~ATED A~D ~ SL~ ,, ~LE~ D~ LINES. C CF, Z2:~ ol:oa 5_.~ ~ ........ . c. Tq _01:00 01';~0 O.SO~ ~ q~TH B~p, C o1=301~;~0 ~,50 R/u SCHL~BERGEK, x~ RET~I'NER. Riff, TAGGE~ U~ AT 95~' ~H. SET C ~ - RETAINER AT ~71' MLH..~H. P~ SCHL~BERGER~ .. , , .,.. ,,,. ~ ,. ,,, .... ,. ,, , . ,. - .., , - _~ ,. , ., , . , ~ :..,??, ,,,.~ ,~ . .... _ __ . ........ , ..'. , ~,.%, ,5 '~L ,: ,,,, ~....,~,; ' I · . . ' ' ' "' '' "~ ' 'T' '"~ ~ '~"h~ ,, .., ..~ i _ _ ..., , , .... , _ . ·. ·, .'~ '~, ~ ,,'.'. ,~, ,,: , .., ,. . , ,,. ... I ,,,. .,.·. DALLY ~ELL ~TS ~9~5 i ii , i .. ~ 1~ '96 06:~?~M SHP DRILLIM~ MOC DATE: ~/12t96 DATE OF LAST BOP TEST: I~./I0/g6 BARIIE Used UBed Oil. IIF.&T _ _ --- ~RILL SiATER ~ ~ POT gATER Used I~EL Used ~ ~aR$ ...._to CONNECT ION OAS to TRIP GAS to SlIALE OEN: .___._ PORE PRESS: __.___ AJICHOR TENSIONS ¢1000 Lbs) 5. 6._ , 7.~ 8..._._. BALL JOINT ANGLE OFFSET O 1RECT 10N ACCIDENTS REPORTED LAST 2& HOURSt NAI4E OF INJURED : ENPLOYER SOCIAL SEC. NO. : , TINE OF ACCIDENT: , DESCRIPTION OF ACCIDENT; STATUS OF 1 tiJURED: WINED OIRECTtON: VELOCITY .__ gAVE DIRECTION & BT. ~ ' ROLL gAVE PERICID , HEAVE P~TCH ,....._ ~LitO. H[ADING_..___. VOL '~RSONNEL DATA: NOG 1 POOL 17 TOTAL: 24 HOUCO 1 SCHLUI~R~ER .,.:.'.:.'..:: ;: :..F:,". :'~".. :~ N BIT 6.000 3.5" 3.500 3 72B.2,~ ,, -"--------- o HA LENGTH: 1288.4 NOURS ON NOURS ON i~URS ON SER NO. MOTOR: ._._____ JARS: SER NO. DC: , , HEVZ b'l': ,,, ~828 8013 8106 8169 67.61 8~54 8t,~7 85&0 8r~6 8819 8912 16.70 l& 12,64, 10.91 10.74 9..~B 7.92 6.83 5 2.65 t.8a 1.39 1.77 DIRECTI 316.75 316,57 31&.ss :519.56 32o.6o 319.97 319.86 316..73 16.01 355.67 353.23 3SO.O0 7127.32 721,5.~? 7306.21 7'597.25 7/.59.13 7%9.68 76&1 7826.30 11012.0o 810~.97 8197.93 8695.62 8965 2066.89 2~B2.~ 2096,50 211B.30 2129.19 21]8.32 2145.70 215&.21 2156.80 2159.35 2176.62 -2026.02 2.022 -21~3.15 2906.24 2.1166, - 2058.57 2928.29 2.377 - 2071.53 29/.7.24, 2.156 2959,J 0°720 2975.15 1.282 - 2098.2~ 2989 · 23 1.7a8 -2105.91 3001.13 1.172 -2112./.3 3010.95 1.6§1 3017. -Z116.79 :5020.05 1 .B72 -2116.4,5 3021.65 O. 809 -2116.70 302~,63 -2119.31 :50.17.68 0.099 0.101 ~PR 11 '96 06:B?AM SHP DRILLIM~ MOC P.1/~ · i ~i ii i i iii i BATE O&ll_lJ"~ KP? /t,~ ell:LiS 13~l-a {'.ttFF¥ UELL IL4JdE I~,~REA CREEI~ FED #1 No 1 ..... RIG Al;i; $ /,271000 DEEPEST TAIIGET TTONEK a ~1'nll PTVI~ ~11111~ IFF.MI1. nFPTH rm"l ~ ¢TT/13~ ~ FOOTAGE ~ I~$ PRESENT OP: RIH P/U ~ lJ'~' DRI[L~. PIPE. i #J #llg~ I I I LAST CASING O.D. 7.000 LAST ~&SIMG SHaE DEPTH ~ ft. SHOE TEST PPG OArS ON LOCATION LINER 2 O.D. INTERVAL - JR. SHOE TEST PPG PROGN~ED DATS LINER ;3 O.D. INTEItVAL - ft. SLIDE TEST _ __ PPG _ _ .. · ·., , · EXECUTIVE StJ,14ARY: L/D ~ "I~R~LL PIPE I'RGH DERRZC~, L~ K~LLI', ?/1J ,T ~[~'. ~LLy, T[*JT;I} I~J,~,¥ ^~C) ~l,,t,,Y UAt.~g TO ."SO/SO00 PSZ. P/U BHA. RI# P[U ~_]~/~N~PJJ,.,L PZPE. . ........ ,.. , , .. B il i iii IWJO UT '10.? V~S 63 P~ '16, Yp 22 GELS ~ ~1 pH _8~ ~ 10 HPHT ~ Pm~ Pr/ri'F_ / '1.8 SPH #'1 ... S1:91 ~ ~ TOT SPI4 ~ =- PRESSURE TOT Gi~ kNN VEt DP ~ DC _----.- CI~.IT 't07.3 .~L9 !.31~R 8,500! C-~VLRG RJSO0 l& 1/. l&.... 9738 1~ 13 ~l.[oo~i C-3ULiIC BJ~O0 ........ ;1_4 ~, 1/t [ 310 1~.70 15.]2' gT311 Z Z gT...A E ~ rT Tn JV-' git PRESSURE DROP: ._._____ psi BIT HP: BIT HP/irg.: -_-.-..-- .................. ROTATIRG STRING UT. BHA laT. IN NIX); ~7 RP#: SLAC,~ OFF UT. t. K3~: ~ - ~ i)ll."ll: I.~ UT. TaRI]UE! ;;.~:m.m?.,:?.;;.,:~; ,;, ,.;...~ ~..'. ;. ~`.~j~`r~`~t~wt:~L~i~:;.~;.~...;~:~;'"'~'~u~.~;(~`.'~`~'~:~;f~:~'~y~`.~¥~:~:`::F:.:.~:~:~:~ ..... ..~;;:~l~.~.~i :.';~i.~"".'lEd~}l~i~'~ .......... :... .......... ?..,..,.: ....... .~ .......................................... . .......................... ~ .................. '~':'~:~:::'. '..'.. ~.;:'. B6:66 28:~!61 I&.!]§ LAYEG ~ ~1' t~RILL FIFE 6UT 6P 5,ERRIC£. ~ 2o~o ~:oo ?.5o LA'rED m:x,m S" ~LLY ^.0 PIC~D' Ur, $ '1,/:~""IC'~L"L¥..~HA. NGE~_~T BEAK.ING~; ~-' -or ~.u_n BUSHINGS. - P.~-~IJi U-,-~jll I,[g]--?llJJLIFIIAII JU' l{i'~l.~ "UPPIR Ail! I, lgJR I(11,1,¥ ¥^~,V~9 ^'J¥ iaa°n 'fa a nT g}Q/~nO9 PSI. ~:]~, gO;~O ~,00 R/U TO RUld] 1/~" DRILL PIPE. C DS O~:'TO 1~:50 1.00 ._.SLIP AHD___CU_T_!]_O! OF DRILL LIHE. C 0~:'~ 06...00 1.SO nih P/U '~ 1/~'" ORILL PIPE ......... C ,. . . . .... , Illll, I . . m .mil , . . , ........ .,~ .* · ........... , · j ...... · ., ,, .I ................................ .... , .. " ,, ,' '". J .'l , ,, · ' " . · ,', ,% ;': ' ~ :, '> ; L ' .... ~, ', .~,.' ......... ' ' .... r' ""?iii'il. ;~:;:"::":'~: - .......... ' ,, ,,'..,. i,' ",", ,, . , , [ DALLY UELL COSTS 25&18 J CUI4S 281679] DALLY HIJ~$ ,~9~ ~ ~ Supervisor: PKB I __ _ DATE: ~/11/96 RiG 1;~2o CONTRA~TC~ D01.'NTIPIE_ ~ 11.5o hfs ~lc ur I..A~I I~f,.,e' lCb, I: O,~Pt 10/ge, WIND OIR{:CTIC~I~ -VPLOCtq'Y __ __ BARITE Used ~vE PERIOD KUuu I~T. NEAT ...... Used PITCH __ #lAVE lIlT. BLEND u~l__ ~ARo. ~ HEADING DRILL I, IATER Used VOL POT I~.TER Used .__ ..,. I:UEL Used P£RS~I#EL DATA-' ~ 1 POOL 17 gl I e~K 1' BACKGROUND GAS to TOTAL; 70 COIINECT TOll ~A$ to TRiP GAS to ..... SLOW PUHP BATES TAICEN 0 ft ................... , ..... . ...... -~ ~:,- ,.: ............. :'..,. :... .......... ,,,.' ....... ' ~LII) NO. 1 ~ICP G ~ ~':: i" ~'""'": :': "'~:':""'""" "'"""'": (':'''~'''~'~''!''n II&?.,NLII~]~.'; ':~,..' ............ -~9 :. :.'~'::?:?..?::.;::,..:,.,,:,;:.,':,:v:~;:,::.,'::.v:.,:.,:::~,:,':::, SRCP '-- a -- SPN ': .:.~OOL:.,OESL~Rip,~. ON,.i.~::,:.~.:: ....... ,..,....,:.. ,'i:i?i:~'":'~,:':'.:,.,:.',~?:':?:~b:':':~ ~,_~.X,:;'.LENGI ..... : lamp #0. 2 SRCP ~ ~ : 51~1 1 BIT 6.0OO ... 0.75 gCP I SPf4 1 CSG SCI~APER, . /o.313 1.6;)5 2L-IZ '--- .. _1 .B. ZT m_~ ~.750 Z~ZSO 2.99 9UALC DCU: tq)l~C PltCOC: 111 tTEEL DRILL ~::~L,LRR &.750 2.2S0 _5~t_~1 --- -- Z4 ].5Il ZS.~ HM)P 1.500 2.06~5 ANCNOR TENSIONS (1000 Lbe) __ _ '"' ,. ,,,, . _ 1- .___. 2- ------ .... $. 4, S. 6. , 7. 8. .. ...... BALL JOINT ..... , . ____ ANGLE OFFSET O ! RECT ! Oil ..... , , l. iii jrr'ilIFliT1 I, FIE~TFI1 I ART ?L HIIIII'S ...... NAHE OF I KJURED : ENPLOYER : . , · - SOCIAL SEc. NO. : ...... "- TINE OF ACCIDENT; .----- TOTAL B~A LENGTH: 12-,~..,.~'~ DESCRIPTION OF ACCIDENT: HOI~S ON HOTOR: SER NO. - -- -- _ ___ HeURI ~ d~S-i iT '_,c~TUS O~ [#JURED: HOURS ON DC: H[]IJR5 ON #EVi VT: i I~1 II ~ ........................ '_ ..... I' ....... '.~'F[ 'i"i'I~ '"l;[lllilllllllllllllltllllll III lu'l II'U'l'iili'lT(nYiYiiYdii'i'diiiYiYi"i'Y'"'T'T'~ i,u,llllu,.l~ !.!1!!.!! !.!!.~ !.!.!!!! !!!! !!! .. ......... ..,.. ....... ,..,..~..,,.;,:=,;.,~,: ..... ~. :.~. :,.. -: ..._.~ ..... . ..... : .... ..:.:.: ~.~:.,..:::,,~,,::.::::,,,,:,,,,,.,,~:,, .................. ........ ' ..... ; .... "I ;1'1 ' ' ' ' , , , , , , ' ... . ' ~ i I a I I I I i I I ..... . . . ............................... ;;..,,iii ,t) ! ,) ) ,~ ,, ~,,), ~,,,,I,t,W,,~,t,~,,~,.,,.,,~,,...,,.~,,., ,,,,,.,,,.,,.,,,,,.,,,,,,,.,,,,,;,,,,,,,,.:;,,;,;~;;: ',; j .~, ifF. i~,ti'~l iYr,i ~il(~,Lt ~. ~q B~L O~ .......................................... ,, ....................... .Ea. DEPTH AKa.,, eC- 7920 1&.80 316.57 7215.BT 2066.B9 - 204,3.15 291:)6.2~ Z.066 8106 10.91 ~19.:~b ~W. 25 Z096.50 - 2071.53 2947.24 Z. 136 8169 __10: 7_~__. ~;~1.80 7~,59.13 2105.65 -Z07~.03 2959.02 0.720 az61 9.~a $20.60 7~/,9.68 2118.;50 - 2089.19 29~. 15 1.2B2 ~,l, ?.9~ ;]19.97 7IA, I .Z,O ~IL"9.19 ~-,j,,~. ;~.., ;.-.~;. ,,~, ~,&7 .6.B3 ~19.86 77~.83 ~138.$2 -2105.91 ],001.13 1.172 8~&O .5.33 316.73 7~6.~0 ?..14,S.70 -2112.&$ :5D10.9~ R~xx 2.65 .' _315-. o6 7~1e.o7 215o.7g -2116.]0__ ],017. L:1'9 3.156 ' 87Z0 1.88 16.Ol aOlZ .oo Zl~&.Zl -gl 16. n~ ~uzu. u~ '1.672 8819 1 .]9 ;~.6~ m o~.gr zl ~6.uu -il 16.45 30~1.65 0.809 8912 1.7T :5S3. ?.~ 8197.95 2159.:55 -Zl16.71) $0~:~.63 0.&15 ~10 2.2.~ 350.0~ ~ ~ -Z14~.3! :~x.7...6~. ~.,~ :).00 ~?.oD _ ., ~5..4./.__ 2186.43 -~.~ ]0/,6.02 o.lol IIOTES: · ...... ,,,,, _ ___ ..... · , , _ ~PR 18 ~g6 06:16~M SHP DRILLING MOC P.1/2 ii i i · DATE 0~/10/96 RPT ~ FIELD CC~EA CREE~I[ 1,ELL ~ ~EA ~EE[ FED ~1 NO 1 RIG 12~ AFE S ~71~ DE~EST T~T TI~EK ~ ~ PT~' ~0~ AFE.NO. ~ DEPTN (~) ~ (~) .,~ ~ _---~ H~RS PRE~NT ~: LAYING ~ 5" ORtLL PT~ -- ~T ~SING O.D. 7.0~ ~ ~IMG SH~ DEPTH ~ ft. S~ TEST _ ~ DAYS ~ L~TI~ LIK~ 1 O.D. -- INTE~ __ - ft. S~ TEST PK OAYS LIN~ 2 O.D. IS~RV~ ' ft. SHffi TEST P~ PR~D ~YS LINER 3 O.D. ZNT~V~ -- - - ft. S~ TE~ . . , N~ ~S. _~SlNG SLIPg. P_~__R~Gfl ~O FIlL ~T~. INSTALIFD TUqIU~.SP~ ~D TE~EO.~E. ~'[A~ LINES. TES~D ~[$. ST~l~ LAYING.O~N 5- DP. ... . . ., ... .. .. . M . ,, .__ i .. . , . . ~ ~ IO.Z ViS ~ ~ ~ YP 2~ ~LS ~~ ~ Z.~ ~ ~ HP~T ~ ~ Pf/.f~ 1,.~ Ct ~ ~ 600 ~ OiL ~ ~IOS 2~ BENTI~LT 15.~ /~ DRILLED ~9~.1 ~ITE -$1.5 (L~L) ,,. i. ., .,. SPA ~1 ~ ~ TOT ~ PRE~E T~ ~ ~N ~L DP DC : ::~N~ '~t~ ;:~S-~-~.~:;~ b ::. :'.,~ ~.:~:~?~'. ~; ~ ~I:t [/~:~.~::~: ~:~::::::dET{~'~j:.)~:~ FEE.~::~:'~ :~H~d ';::+:FT~HR~?~' l, . _. , ,, ,, , ,,.., Jr; BIT PRES~E p~t .... ~i GIT HP: ~ 81T 8Plid: . , .., ~TATING STaING ~. __ g~ ~. IH ~: ~: __" S~ OFF ~. ~: ~ ' ...... :.t:,:..l,,.~:,.,,.,,~.,.,..,,~.:..:.,.;l.,.~l,.,,,.,%,.'~,,., :?',,, ?~ ?~: ~,~.1~'.'. ' ~..,II:;~:, ~'"'"'"""'"""' ..... "'""'"" ........ .',;.;:J~..l '1 ......... ~:001~30 2.~ ~ ST~ A~ P/U.~. SET SLIPS UETH 1~ .... IES~D ~E TO ~ PSt Fffi.30 Hl~~ . ,, 1&:~.~21:30 7,50 'N/U DSA,. S~. ~O ~,S. ~/U pIT~ER NI~LE, ~L~ LINE._TRIP TANK LINES, HISC ~ES. C~H~P l~.~O ~TT~ SET OF R~S TO ~ 1/2". ._~1:30 122:30 1.~ R/D ~AS,I~ E~I~NT. ,~ OT ~=~0 O~:ffi _~.50 FUNCTT~EO ALL l~S... ~.RF~EO AC~LAT~ TESJ ~[T T~ST ~L~. TESteD C PT ALL LINES, R~S, ~IF~Q A~ VALES 2~0/5000 ~i.. T~TED ANNULAR 250/ -, 25~ PSI.(~ TREBLE GETTING TEST_P[~ TO SEAL ). . ~:00 ~:00 [..~' ~P 5" DP ~ OF OERR.IC~.q .... C OS .... ,... , .. ,, . ,. , ..... ., ... ,.. , ..-, .., ·.. .,. . il ,, ,,... ... ,. .. _.... , . ,, _ · ,, .,,; ?,'./ ~"~ ;~ ~' ,~,.~ .,. ', .,~,; ~. ' ~ ~ ,,, .,. ,, , . ... .. DAZLY ~LL ~S ~928 ~ 2~!3~ DALLY ~ ~ ~ 18~ S~isor: LHL i APR 18 '96 OG:IBAM SHP DRILLIMG MOC P.2×2 OATE: ~ RIG 1220 ~ ~ L~T ~ TE~T: ~/~ g]~ DIRECTLY: ~L~]TY .... ' ~ DIRECT]~ & ~. ' ~Z~ ~ ~ PER]~ ~L ~T. ~T ~ PITCH ~. ~ : _ ~ ~O. __ .. ~ILL ~TER ~ ~L ~T ~T~ ~ .. ..... HZ I R~ 1 ~~ ~ to T~AL: Z1 ~ 1 TRiP ~ to SL~ ~P ~T[S T~H ~ ft. ' · . .. SKE D[K; ~E PRESS: ~ . ........ . ii I I I , il ~C~ TENS]~S (10~ i~) ,.. .. ~-- i i I I I 1 .... 2.~ ....... -- i , 5.:., 6. _. .... 7. ~ ...... "- i i ' i , mi i i ANGLE OF FS[T b ~ ~ECT ~ ~ _ · ..... i B I I I III ii Ill II .~1 A~]OENTS RE~T~ L~T 2~ HUS; .... - N~ DF I KJ~ED : ... .. WL~E~ : ....... ~[AL SEC. ~. : ....... TINE OF ~]DENT: ~ " .., TOTA~'~ LENGTH: ,,' 5E~SPT;~ OF ACCIDENT: ~RS ~ N~: SER ~. .., , ~TATUS OF iNJURED~ .... H~RS ~ HEV2 ~: 27&.0 ...... · . ...,,., ,. ,../., :. :.,,.......,, . ..., ,, ;,, .. ,..,., .., ,., .;..,........, .~; -.~.,~ ...................... :':".':'":';iT '*';;."'; ............................. ............. '"" ~'" ' .... "- E/U ~RT · SEC.. G~ L~ REA. DEPTK ~GLE DIRECT I~ _T~ N/S -- '~0 I~.~ ]16.57 ~1S.~7 2~.~ K13 12.~ 31~.58 ~.21 ~.~ -~8.57 ~.~ 2.3~ 81~ 10.91 319.56 ~.~ 2~.50 -~71,53 ~7.2~ 2.15~ ~1~ 10,74 321 ~ 7459. I~ ~105.65 - ZOo. 03 ~9.02 O,~O ~ 9.58 ~.~ ~9.~ ~1~8.~0 -2~9.19 29~.15 1 .Z~ ~7 6.~ 319.~ ~.~ Z1~.32 -2105.91 3001.13 ~0 5.~ 316.~ ~.30 21L5.~ -2112.U 3010.~ 1.651 ~ 2,65 335.~ ~19.0T M19 1,39 355.6~ 8tM. 97 2156.~ -2116,45 3021.65 0.~ ~2 1 .~ 353.~ 8197.93 Z159.35 -2116,~ 3~.~ 0.4~5 ~10 Z.25 350.DO M~.~ 217~.6a -Z119,31 3037.M 0,~ N~ES; il i - , . ~ I i III i - ' il i I II i II . -- i II i ~ i ~ i DATE ~ RPT &~ FIELD [;~REA CREEk: I~LL NAHE CO~EA cREEK F~_ N] ~o 1 R[G .~22D AFE $ ~71~ DEE~ST T~T TYONEK _ ~ 5~0 PT~ ~ AFE.~. ~~ DEPTH (~) _~ (T~) ~ F~TA~ ~S PRE~NT ~: N/D 9~ STAC~ .. ~T ~t~G O.D. ~0 L~T ~NG S~ DEPTH ~ ft. gH~ TEST ., P~ DAY~ ~ L~TT~ LINER 1 O.D. lXTERVAL ~ ft. S~ TEST ~ PPG DAYS StH~ ~ _ LZNER 2 O.D. ~NT~VAL ft. S~ TEST ~O ~~ DAYS LZNEfl 3 O.D. ~ INTERVAL ft. S~ TEST ~ -.. C~gE. NT. ~IR~kATED ~D ~Tt~ED ~, ~~ ~ STAGE q[TH 6~0 ~ CEHENT. ~T~TED NtPPLXN6 ~ STA~. ' - - i., . i. .. l.. -,- Il .... -- ~ VT 10.7 ViS ~ PV 1~ YP ~ ~L$ ~ ~ ~ ~-T ~ ~ KPHT ~ -- ~ PT/Nf~ 1.~ Ct ~OOO0 C8 ~ ~01t X~LXDS 2~ BENTi~LT ~/ 11.~ DR]LL~ ~ ~RZTE-52.0 (L~L) ... ,.,., . . S~ ~1 ..... S~ ~ ,, TOT ~g . . PRES~[ TOT ~ ~ ANN ~L DP OC CRIT . .. , .. JVc BIT PREPARE O~: .~ ~J B~T HP: BIT R~ATING STRSNG ~. ~ B~ m. IN ~: ~ R~: - S~ OFF ~. ~ ~ ~:~0 0.~0' FI.I~HE9 RUNninG 7" ~UCT~ON ,USING ~o,,~'. _ C ~:30 1]~OO 6.50i CIR~LAT~ AND ~TZ~EO ~, THINNING ~E 6A~. RE~J~R~TEo plp~, C uP ~ ~, 'o~.~or. " 1]~QQ ]5:30 2.5D~ ,E(P ~FETT.KETTNG. ~M~D 10.~S CHEMX~L ~Ht TESTED ~ZNES TO C "'m 3000 PSt. ~ ~ ~LS CHEHI~L ~flr_ HIX A~ ~P~ 550 ~_C~SS " 'G' VZTN ~X ~CL, .~ ~L/~ D-1~9..2 ~L/SX ~-1~5A M 15.0 PPG. _, DISPL~D ulTfl.3.65 BBLS ~. PLUG ~KD. CHEC~ FL~TS ~.. CZP 1510 " .. HRS &-8-~..~ECTPR~TED PIPE. ~ULLRETU~NS ENTIRE aO8, ~72EHPTED T~ pREpaRE UP TO ~EN ST~GE_~LAR, ~PING PAST ~.. ,, -- '~5:DO 16:30 ~.~ OR~D STAGE ~LLAR OP("IN~.DEVICE A.D LET ~ ~. . C 16:30 ~23:30 7,0~] PRESSED ~ AGAINST ~NING DEVICE '~B ~ STAGE ~L~ AT ~. C CF ~TTH 7~ PSI. CIRCUITED AND C~DZTI~ED ~.UHILE ~. GOT CHEHC[AL 23:3~ [O~:~ ~.~-~ HELD ~F~Y ~EETTNG. ~PED 10 BBL~'~HEHICAL ~SHa T~ST ~Z'NES TO ~00 .C' ~t. LEAKING. REPAZK[p .S~E. P~PED ZO Bp. LS. CHENI~L UASH A~ 6~.~ CLASS *G, HIXED A~ ~ AT ~5.8 PPG, DISPLACED UITH 25T BB~ ~- .,, .... CL~P STAGE,,C~R UZTH ~ PSl. CZP AT 310 HRS, ~-~. H~ FULL RET~N~ THR~GH~T J~. CHECK F~ ~L~,N~E N~T~;,,,~OT CHEHI~L '- ~SH ~ To ~FACE. 03:~0 ~:~0 1.,00 ~ITER ~L~, R/O Q~LL~ PREP TO N~ STACK. ' - '' ~ OT ~:~0 ~00 1.5Q ~ ~ STACK ....... C , .., . .. , , ;:' ,, ,.,..,, ,, ,; ,~ . ',*,, ,,~' ,:' ,~ :, , ,. . . ............. .. ~.' ;~,,~ ~' "~,' ,, , . '~,: ~ ~:,~ ?,:[',,:,,' (':,', ~:,,, ~' ,~. :~,..~,,,,,~:,..~:~,,,.:.. ,, Il ' i Mi ;,i;~fl1 ,' i *11 , .. ,. DALLY ~LL ~ ~~ ~ 2767~7 DAlLy ~S 21~ ~ 1~1~ ~isor: LHL . l, · R3G 1220 CONTRACTOR OMTZNE CI~~_Q hfs ~T. N~T ~ PATCH ...... H~VE ~T . BLEND ~ 8ARO. H~ I KG ~ILL ~TEA ~ ~L POT WTER ~ ............................... m 1 E~H ~~ ~ ~ to ~ T~AL: 26 ~ 1 D~LL ~NE~lm ~ ~ tO ~ER 1 N~ 1 TRI~ ~G ~ to SL~ ~P ~TES T~EN ~ ~t. ~,,,,: .............. ~ ' 't: ~:: : ::~::::t~a:~~;:: :::: t: :' m:~: ::m: :~:;:::::: :::::::::::::::::::::::::::::: ~ N~. I II~ I I~ '*.:.': .:'::. ;:::.'~ .............................. . ..... '- ,' .:,.:... :,.'...:,...:...: ............................................ ~ -- ~ ~ ~I 'i;~i'i'~~,O~ii:i:.~ i.ii:..i 'i .i:i')ii ~i,: i~'i i:~,i~,'i(i.iJO,:ii, i,i,',,i~,:im',~N~#'i~',i,:i, B I Iiii g~LE DEN: ~E PRES~: ._ MC~ TENS;~S (1000 1. 2 .... 5. _ . 6. BALL JOIN1 ...... ~GLE OFFSET D;RECTI~ ~CZDENTS RE~?~ L~T 2& H~RS: E~L~ER ~lif ~rr Mn . T]~ Or ACCiDCNT. TOTA~ aHA IG~iPliW OF A~IDGNTi ~S ~ ~: SER ~. ~S ~ aARS: ~R ~. SlATUS O~ INJURED: ~S ~ DC: ~S ~ HGV1 ~: 27~.0 ~I-(~-(I~-(-I-ITIIIIIIlIII'I-I~I-I I~ II~ ~ II T~ III II- Ill .... ~ --~ 1 I I 1 - fY ...... ~T T~I:1H Tt ~T IJTI T ~:[ ] ~U~T1~i~T~T~HH~1~[~i~H~[~1~T~HT~H~HH~H~H~H~H~ I' i I~ ~ll iii ,.I, e , . I . . . . ; * ,,.,,,,,,,, ........ II .... Ill I * , I I Illlll IIIhl Il II II ,llfllll hR,il flllll ,,. , .... .,~ ..... :...,,. . ....... 'EIREG~C,,~V~I,,,,, .............................................. , ................................. , ........ ,,,,,,,,,, .;~L'::~;:.~::'::L~.;.'::L.'~'~.:.':.~.~:~.:.~.:;::.':.~.:: ................... ¥::~.~.:.~..[:~:..~....~.?:...:/:.?.:.~.:.~:?..:.::~.~.:'.~:~;.'~..'..;: .... ' ~.. ................ ',:,....' .' :..~ ': .... : ............. .:~:.:~ .... ... ...... :f ;'.? :, ;.' ~:. :.;: .: .; .;~'::~:~:.";:'..:.~:?~::~.:: ?::'.~:::::::::~.~:;:?.~-:::'::~::.: H~. DEPTH ANGLE DIRECT]~ T~ N/S E/~ VERT. SEC. ~ 16.~ 316.~ 7127.32 ~.~ -~.02 ~1.~' 2.022 i ~7 6.~ 319.M ~.~ 21~.32 -21~.91 3001.13 K 5.33 316.~' G.30 ~1&5.~ -~112.&] ~010~ 1.651 O~ 1.~ 16.01 ~1~,00 ~1~.~1 ;11G.~ 30~. O~ 1.0~ M19 1.39 355.67 81~ .97 2156.~ -2116.45 3021:65 0.~ ~12 1.~ 353.~ 8197.~3 2159.35 -2116.70 30~.~ 0.~15 ~ ~.~ ~7.00 B965.GG 21~.43 -2121 .~ 3~.0~ 0.101 NOTES: ,., ,..,,,, . , . ,.,..,, ....... , ,,, 0., ..,..,,., ,,,,. ..... .... , ...... , , .. .... Il Il Il,... II mil ~/~'d DO~ DNIqqI~fl dHS ~E~:~ 9~, 68 ~d~ APR 08 '96 04:55AM SHP DRILLING MOC P.1/2 iii i , i i · D~AT~ ~ RPT ~ FIELD ,C~EA CgEE~C gELL ~ ~EA ~EEC F~D ~1 No 1, RIG 1~ AFE S ~ DE~E$T T~T TJ~E~ g 57~ PT~ ~ ~FE.~. DEPTK (m) 9~ (~) ~ F~TA~ ~S PRESENT ~: ~NING PR~[~ ~SIN~ ~ ~SZNG O.D. ~,.6~ ~ST ~SZNG S~ DEPTH ~ ft. S~ TEST ~3.10 P~ DAYS ~ L~TI~ LINER 1 O.D. INTEgV~ - ft. $H~ TEST PPG DAYS SZNCE ~ LIN~ 2 O.D. " IM~RVAL ~ ' ~ ft. S~ TE~T ~ P~ P~ED DAYS LINEI 3 O.D. INTE~AL - ~ ft. S~ TEST ~ ~ .. .. L~ 8H~ CHA~ ~ TO 7~. ~U A~ ~ ~ P~TZ~ mS:NG .... __ l' Il '1 I i ~ ~ 10.8 Vl~ ~ ~ 18 YP &2 ~LS ~~ ~ ~.9 ~ ~ HPHT ~ ~ Pf~f~ 1.3 C1 ~ ~ ~2 I 0t~ _- _~ ~IDS ~ BEMT/~L~ 15.~~1~.1 DRILL~ ~Z.~. B~ITE ~(tbl~t)' I I II S~ Il ~ .. TOT ~ ~ PRES~E = T~ ~ ~N ~L DP DC CRIT .:~N~i..~:'~I'i~:~;~ ~'~.~ ~,~t'/??'~PE'~:.':.":/~ ~ ~i~A[" ~.NO ~-':~-~':::.~: ,¢~T.[~.~:~ :~_.:1.:. ~ EE~:.::?.~: :H ~g?.:' ,':..~:~t~;.:~.'...::O~R~I :~_.~:'.~.~';L:_~ ~.=[.~j;.~.> 6 ' 'G ... , , ...... ~__ , ~ , JV: BIT PRE.RE DR~: .. ~i BIT gP: _ BIT HP/i~: .,. . , ~ATING STRING ~. BHA ~. IN ~; R~: - ~ SL~ OFF ~. ~ ~ ~ ' .... ~T~T~ ::::~E~:~'~~1 ::~iT::~..~.,:;::.:!: :,.::{.;.~,~??~.~::::.~.,:;.~:.i~:::~,;::~ :.~.~lrl~,:,lN.~.~E~{~:~::....::-::;:~.;~:~.:::~.~?~(:~i~.~:...~::,~ :;..}:;:~::~:~:~::~:~i:.:':.:~.::::::~:::~::::~::.~: ~.,';.:".~'~:' ~:001~:301 0,501 _~ BREAKS ON KELLT ,q OT __ ~:3o/~.;~: 1,50 ..L/D d~s. STABS. AMD DC?~'. ' ' '" G ~:ffi 10:~ 2.00 ~LL~D ~R ~HING. sET TEST PL~. CHAN~D T~..~l OF ~s TO ~,' C. m _ TESTED D~S TO ,1~ PSI. , _10:09,1~;~ &,~ R~'STA~TNG ~_~, A~ CASiNG.T~$. R~ FILL U~' LINE. HEL~ ~F~TY C HEETING, ~3;0~ ~:oo 1T,~ ~ ~ ~ N-~ gTE, ~ p-116 BTC, ~0 ~ P:.T,TQ ~6 PR~CTI~ C ., ~SING. TOTA~ O~ ~1 ~ENTRALIZERS RUN...HA~ 2~ J[~ ~T OF 2~p RUN ~T .. - FE~RT TIHE ......... , . , _--, il, . ,. ~ , ,. , i -. ' ' .,. . , .. i ....... i '" - ' '" .. ~'. ~ ~//~i':'" .., ,, , ....... ;., .~..,~. ~ ? ~:~' ~:'}' ,, _ ~ . ~ _ ,,, ,, , , ........ , , " ~R~8 'DG O~:SG~M SHP DRILLIMG MOC P.2~2 DRILL I~TEIt ~ U~ed -- POT Id&TER - gm:Kouxam GAs to ___ CXIIIECTIOM GAS ___ to to TRIP GAS ----- SLOU ~ I~TES TAIU[N B .____. ft. ~ KO. 1 SRCP 8 SPl4 PUI4P NO. 2 SRCP , ii __. SP# SRCP __._.. G ----, SPN SHALE DEN: ~ PC~E PRESS ANCtIDI~ TENSZOMS (1000 tbs) 6...__.. BALL JOl ilT ANGLE OFFSET DIRECTIC~I pERSONNEL DATA: HDC 1 POOL HI 1 EPOCN TOTAL'- 27 R&JC UEATNERFOIU:) ACCIDENTS REPQIZTED LAST 2& I~URS: ~ OF INJURED ; ~NPLOYER : SOCIAL SEC. NO, : ~ Ti#E OF ACCIDENT: .._.... DESC.~IPTION OF ACCIDENT: STATUS OF INJUREO: -- SEI~ NO. ~ IU~URS I~ JARS: HOURS OM 0C: ~- HOURS OM H£V! MT; __ 2~r&-O 7e2e 7215.87 2066.89 -;~0~3.15 7920 1&.BO 316.57 -Z051~.57 2~28.29 el~ 10.91 319.56 ~.~ 2~.50 -2071.53 ~47.24 ~1 7~1 .~ 21~.19 -~'~ ~'~ ~5~ 7.9Z 319.97 3~1.13 ~7 6.~ 3W.M ~,~ 21~.]Z -~1~.91 8726 1.58 16.01 0012.00 8819 1,39 355.67 89t2 1.77 353.23 S19';'.93 9410 2.25 350.00 B695.62 2.022 2.066 2.377 2.156 1.2flZ 1.'?~8 1.172 1.651 16.79 1.87~ 2156.80 -~116.&5 30~1.65 0.609 2159.35 -21~6.70 3023.63 0.&15 2176,62 -2119.31 3037.68 0.099 'ES: DAlE ~ RPT ~1 FIELD ~:~)~EA CREEK UI~LL ~ (~)REA CREEK [~ el Wo 1 RIG AFE S ~71000 DEEP~SI TAR~T TYO~ ~ ~ pi~ ~0~ AFE.NO. ~ DEPTH (~) 9~ (T~) ~ F~T~ ~RS , PRE.ST ~: ~ B~ -- ,, _ ,, ~ ~ING O.D. 9.6~ ~T ~ING SH~ DEPTH ~ ft. S~ TEST 13.10. ~G ~Y$ ~ L~TI~ LINER 1 O.D. ~ INTERVAL ~ ' ~t. g~ TEST ___ ~ DAYS SI~CE LIN[R 2 O.D. ~ INTERVAL ~ - ft. S~ T[ST ~ p~ ~~ ~YS ~INER 3 O.D. INTEBV~ - ft. S~ TEST ~ P~ _ ,, EXE~I~ ~Y: ~ glTH UIR~IN~. ~ g/_DRI[~ PX~. L~ FISH, FULL RETRY OF L~GI~G T~S. L~ FI~HIgG T~. H~ 9HA AND RtN TO ~'. CIR~TEO ANO C~DITI~ED ~. PC~ T9 ~ ~S~NO, .-- _ ... . - ., .., ~ ~ 10.8 VIS ~ PV 22 YP ~ GE1.S ~ 5~ ~ Z.B ~ ~ HPHT UL ~ PflNf2 1.2 Ct ~OO Ca ~ I 0i~ ~ ~LIDS 2~ BENT/~LT !5.0_ / 1~.9 DRIlLeD 201,.,~ B~ITE -56.5 Ctbl~t) , , ., l, ~ ~1 ~O ~ ~Z ~ TOT ~N 1~ PRES~E 205~ TOT ~H ~2~ ANK ~L DP . DC___~ CRIT ~ 19 I~R 8.500 C-~RG 8J500 1~ 1~ l& - 18' 1~ 815~ "G-~RG B. JS~ 14.,14 1G 210 11.7o ~..~2 9~ Iz 2_ 17 12 8.500 C-I~RG BJ-~g8 1~ 1~ 14, ~I Z4,.50 ~o.~ ~.ZS[~ 3 BT H E ~ gT PR JV: ~01.5 BIT PRE.RE DRY: ~76.8 ~i 51T HP: Z~7.~ BlT HP/t~: _ ~.~ ,. , ,, ~TATING STRi~ ~T. B~ ~. IN ~: ~ R~: ~ ' ... s~ OFF ~. 1~ ~: ~ ' Pl~ ~ ~. 28~ T~E: ~ ....... E oT 3_ ~-~ IO~OO 1.~ ~ u/ ~[RELZ~E. , ,.,, E TR _ a~oa ~:~ ~,~ _~. ~. _ .... . .... 11:00 ~1:30 0.~0 ~H W_ BHA. l~j~ 13:00~ 1.50 ~O FZgH. f,ULL RE~Y .OF L~GING ~LS. L~ FISHING l~S~ ~'LE~ E Or 3 RIG FL~ OF FISHING T~LS A~ E LINE E~I~ENT. , · ' c 8N 13:00114:ffi 1.00 RI.H ylTH BIT AND B~ ..... lb:O0' 16:30 Z,~O RIH TO ~'.' ~ILLED PIPE. HA~' TIGHT. u~E AT ~OJ,,t C IR ~,. .. ,, 17~0o 18:~ 1,0o'~'nIH TO ~'. '~ASH[g TO 9r~'., H~ 5~ O~ FI~, RE~D S~E TO C 9~5 ', " 18e~01:00 7.00' CZRm~TEp ANO-~D&TZm~D ~. qIXED AND ~P ORY dm. B~ D~ C QF ~ELL[ ...... 01:00, ~;~ 5.00 ~H, PULLEO 50 [ AT ~0~ .. p~ 2~ TO t5,[ ~LL IN S~ F~ 7100~,. TO ~O0'r ,. .. ,, L~T-ON~ ~R OU~ To DAYligHT SAV~NG~ ll~. ,. ., C _ ~ .. ,.. , , ,, .., ..... , , . . .. _... .- . .. ., ., -~ .,. . .. .. ., .. ,- ......... ~.~./ ~-,~" .~,~.~ , .. . ,, ,. ..... DALLY ~LL C~TS ~5 ~ ~05~ DALLY ~S ~ ~ 1~5~ S~rvisor: LHL _. .,, . ,i i E/I'd DOW DNIq]I~O dHS W~EO:90 96, gO ~d~ RPR 06 '96 06:30P~1SHP DRILLING MOC P.1/2 i ii i i i! ..i i 3ATE O&/O~/~ RPT &O FIELD COREA ,CREEK k~LL K)JJE _C~A CREEl: FEO #1 No ~ _ RI~ ~FE $ 4~71000 DE~ST T~T T~EK ~ S~ PT~ ~0~ AFL.NO. ~0~ -_ DEPTH (~) 9~ (T~) ~ F~T~ ~ ~S .... PRESENT ~: FISHING ~LL[NG ~T OF ROP~ .... .. , LAST ~StNG O.D. Q.~ ~T ~SING 5~ DEPTH 2T~ ft. SH~ TE~ 1~.10 PPG DAYS ~ L~TI~ LIXER 1 O.D. iNTERVAL - ~ fi, S~ TEST P~ DAYS SINCE ~ ~0 LINER 2 O,D, _ INT~VAL ~ - ~ ft. SH~ TEST ' ~G PR~D DAYS LZNEX 3 O.D. -- INTEBV~ fT, SH~ TEST PPG . , ftgtS~ L~ING__~ITR DieTER f;~ 62~T T~ ~5~'. P~ ~/GR ~XO R~, TO ~'~ T~ S~U~ AT ~NtLE AT,~EHPTIN~ T~ ~]gOTE. R~ TQ ST~t~ ~ER ~t~ELtNE._P~ JARS AHD~RS~T. _~H STRIPPTNG ~R ~[RELtNE T~7~', T~L_~ FREE. CIRCULATED. ~pLEO T~L .INTO ~ERSHOT. ~ A~ ~&LEO ~T ~F _ R~ET., .... ,, . , , ~ ~T 10.8 VIS ~ ~ 2~ YP ~ ~LS ~~ ~ ~ UL 5 HPHT ~ ~ P~f /, 1.1 .,, , .,, ,, S~ ~1 ~ ~ TOT SPH PRES~E TOT G~ ~N ~L DP ~ OC _ _ CRIT , . , -- . ,, . . . .. , _, .,, JV= . BIT ~ES~E O~: ~ ~i BIT HP: BiT ...... . ,- , ,.. ROTATZ~G STRZNG ~T. BNA ~T. IN ~: RPH: - -- S~ OFF ~, ~ ~g= ~ - .T~LS ........ - ~:301 l&tO01 5.~ N/U ~/GR/~ ANO RIH TQ~O", T~L ~T~ FAILURE~ P~H, L/D~. K LG . - ,_ TESTED T~L ~ UNIT FR~ .939 TQ,11tlS. ,.,~JH UITH ~R/gR (SP LEFT OF~ ), TO ~0,. ~E TIE IN ~ FR~ ?600, TO ~,00 r ATTENPyEO TO ~LI~ATE C~ FR~ ~2Z' TO 9ZOp~NO ~00~ TO,.~~- NO ~CGESS AFTER ~EPEATED.ATTEMPTS. NA~E T~ PA~ES ~ ~AND FR~ ~Q~ TO ~1~. T~L ST~. ~BLE TO ~K ~REE. TOP OF_T~L ~T ~17'. BOTT~ AT ~g'. ~:00 16:~0 2.~0 ~AIT ~' FJS~JNG T~L HA~n -- .~ 16:~0 18~ .~.00 HELD ~FETY HEETING. CL~PED LINE. ~ ~p ~' ~E UP SPEAR ~ E OT ~RS~T. ~ SHEA~ FR~ ~ERRICK. ,. 18~0 Z2:30 -G.~ P~ JARS A~ ~ERSHOT U/ 3.~/8" GR~PLE._. STRIP ~R ~L]ME WITH E BH S~. C~GED ~E~R A~ SINKER.~S, STRIP ~ER ~NE ~[TH ,,H~ UT Op. 2Zt3O ~;~ 5.50 RI~. STRIPPING-~ ~RELINE TO T~' T~ C~E FREE. P~U KELLY AND E CZR~LATED TO CLEAN O~RS~T' -- "~:OP ~00 ~.~ .~ SPEAR 'AND, ~RSHDT OFF. _KNQTTED L~NE ~P S~L~D. ~E ~ TO 'D~. E o~ ~ UITH NTRELZNE [N~ ~RS~T AT. ~6~&~ p~ pP 30,. L~G[N,G T~L_ ., , ~D UP, ~]TH DP. M ~ ~AR CL~P ~ ,~INE AND PULL ~T OF ROPE_~OC[ET . . gl. TH 1~ ~ER~k, ,,. . - ..... , -- .., , ~ ,. , ........ ,,. _ · ..... ~ , , ', ~ . . ,. ~, ,., ,, i .... ,. _ , ,,, .... q~,. 'L., ',' ~, . ....... , ' I , ' , ' ,. ,' ~ ;';~". ~ ''~',~;J',,':'~;'~:'~''' DALLY ~LL ~T$ ~gz&7 C~ 2&5~ DA[LY ~S G~ C~ 1&~85~ s~i~or; LHL ~PR 06 '96 06:BiAM SHP DRILLIMG MOC P.2×2 DATE: ~ DAT£ OF LAST BOP TEST: BARITE 2~ U~ed O4T. NF.J~T ~ CRT. BLEND Used DRILL UATER Used FUEL Used BA~C~ GAS to CONNECTION GAS to TRIP GAS to_.__ HAX. GAS __ . SLOkffPUI4P RATES TAKEN 8 _ ft, PtJHP NO. I SRCP 8 SPI4 SRCP _ _ g ---- SPfl PWg~ NO. ~ SRCP - _. ~ __. SPN SRCP - - a 5P14 SHALE DEN: __ PORE PRESS: ANCHOR TENSIONS (1OO0 Lbs) 1, 3. 4. _ 5. 6. 7.--'--'- BALL JOINT RIG 1721) CONTRACTOi~ I;)CX~TIKE gl--~ DIRECTION: VELOCI'I'Y ~ ~ ~ b/AVE DIRECTION & aT. ~ __ ' -- t,M, VE PERIOD ROLL ~ HEAVE PITCH .__....._ ~RO. , HEAD 1 'VOL 11.5o bra PERSONNEL DATA: IK)C 1 POOL TOTJU.: 27' R&K SC#LUNBERr'r'R TSA ANGLE OFFSET O 1RECl' I ON mm,,. ACCIDENTS REPORTED LAST 2& HOURS: NJU4EE OF IMJU~ '- E#PLOYER : S~IAL SEC:. NO. : TZNE OF ACCIDENT: DESCRIPTION OF ACCIDENT: STATUS OF INJURED: TOTAL ENGT#: SER HOURS ON 140TOR; _.._____ HOURS ON JARS: SER NO. HOURS ON HOURS ON HEVI UT: 274.______~0 · ~ :316.75 7127.32 ZOO./~ -,-u~o.v,~ ...... 78,28 '/920 8013 8106 8261 8354 84~7 85~0 B7'/.6 8819 8912 9410 14.~ 12.6/, 10.91 9.58 7.92 6.83 5.33 2.65 1.B8 1.39 2.25 316.57 314.58 319.56 320.60 319.97 319.86 316.73 10.01 355 .&7 353.23 350.00 30-9& '~~D 3750 7215.$7 7306.21 7397.25 7~9.68 76~1 7733 --- ~12.~ 81~.97 8197.93 2066.89 2082.~ 2096.5O 2105.65 21 IB.30 2129,19 2138.32 21&5.70 2154.21 21S6.80 2159.35 2176.62 -2043.15 -2058.57 -2071.53 -2O89.19 -210S.91 -2112.&3 -2110.30 -2116.79 -2116.&5 -2116.7'0 -2119.31 AND 55O 2906.24 2928.29 29~7.24 2975.15 ~9.~ 3001.13 3010,~ 3017.29._. 3020.05 3021.65 3023o03 3037.68 2.C)66 2.377 2.156 1.26Z 1.788 1.172 1.651 1.872 O.BO~ 0.415 0.101 UATER TOTAL OF ~PR 05 '96 06:~M SHP DRILLIM~ MOC P.1z~ ...... i i ii i i C:)ATE O&/05Pa& RPT 39 FIELJ) ~EEK ..... UELL NAJ4E CCXtEA CREEK FED #I No 1 RIG 122D Ik-FE $ 4271009 DEEPEST T,AJtGET TYONEK a 57'00 PT'VO '~,O0~ AFEoNO. ~)EPTH (ND) 9~ (TVO) . ~;q)Z3 FOOTAGE __ HOL~S PRES~#T OP: LOGGING T~/r F#I/GR[A#S AT ~OO' , , . _ ~AST CASING O.D. 9,675 L~ST CASZNG SHOE DEPTH 25~3 fL. SHOE TEST 13.10 PPG DAYS OJ~ LOCATZM ,39 LINER 1 O.D. INTERVAL . . ~ ft. SHOE TEST PPG DAYS SZliCE SPt3) :S_..~ LZNEil 2 O.D. ~ INTERVAL - ~ ft. SW]E TEST PPG PROGIK)SED DAYS LINER 3 O.D. INTERVAL - - - '-'--' ft. SHOE TEST PPG ' · ,i · .. i EXECUTIVE StH4ARY: FINISflED TI~STING EK~PS. RIN TO 9738'. cIRrllLATED A.k_n CONDITIONI~ li.~r Pf~M, q/U E LINT, KIN _DTPNETER TO 9SC]Qe. ANS QUIT ~ORKZNG. POOH AND CpA~NGJ~D C~,.T. SA~E. Riff.b// Df.P/dETER TO 97~0' AND STARTED _ _LOGGING. . _ _ -- ,--, HUD I/T lo.J vis 80 PV ~0 Yp __~ GELS, 24! 5~6 pH ?.? UL 4 HPNT WL ~ Pf/Hf.__~/ 1._~.~ CZ ~.OOO Ca 400 20iL ..... %SOLIDS 2_~ BENT/SALT _!5.Q~-13.~10RI£[F~D 202.0 BARITE-5&.2 CLb~bbL) _ __ ~ #1 ,,.50 SPfl itl 50 TOT SPIN .,100 PRESSURE ,2.05~ TOT GPfl &2S ANN VEL DP 220.2 DC 3/.6.9 CRIT ,~OO.5 18 1;TL_ ,. 8.500 C-IVLRG RJSO0 14, 14, 1~ ZIO 13.7'0 .... 1~,3~.. _9_738 2_2_-UT"A E ,! CT,,, TO 17 12 8.500 C-lVLR~i Bjo498.,. 1_4.14_.1~ 511 24.50 2Q.85__95_2_8_3~3 81 H E,, & IdT PR JV-- 301,5 BIT PRESSURE DROP; . ~7.6.8 I~1 BIT HP: 217.43 BIT XP/in2; 3,832 ROTATZNG STRING UT. 8HA gl'. ZN 14UO: 60 RPN: - su~ac oFF W. ~ .08.. - PICK UP UT. 28~ TORQUE: ...... · END.. ~tCX~S ....... . ' '; ................. OPEI~T ......................................................... 06:00 07:30 1.50 TESTED 8oP'$. ALL LINES..RN4S..VAJ. VES, HANIFOLD Z50-5000 PSt. ANNULAR. E PT 2SO--X50O. PULLED TEST Pt,.UG,_SET T/EAR BUSHING. --Q~-$_0.08:00 0.50 RIx u/ aHA. " E aH 08:00 13;00 '5-.00' RIH TO 97'38'. HO FILL,_ tJORICED T. IGHT SPOTS AT_ 76~0'. AI~ 9130~. , !~- T~- 13;00 17;.00 4,.00 CIRCULATED AND CONDITIONED HIJO, MAX CAS 92 UNITS E CF :_17_:.00 22:00 5.001 Pt,qdPEO DI~Y JOG ANO PEX)H, PULLED TZG..HT_~..T.9620', 9.~50', 7650', 7'Z10e', E TR 7QQCig. tJO~.KED THROUGH SAHE. - .............. ___~2:30 06:00 7.50! R/IJ SCHLUI4BERGER. RIH UITff"'F#i/GRIAH'$~IQ ~00~. AIdS OLIIT b/ORKING. E IG ...... ~N . CHANGED OI,IT .~dLi4~. RIP TO 9?ZQ'.....LCCGEP FROI4 9~0' TO 6200'--A-T 06~Q .. · .,... ,,, . , , ...... ........... , , .. ,, . .. ,~.. ........ , .. , , ..... , ,, . ,, · ...... , ,, i , ,., ...... - , ,.., .. : ....... " ' '" ,;,"'" ~i i~ ~ · , ~ ' ' i~, ,, ,,..~,,. ,, ....... · i. ,, -. , .. .... · .., · l, , ....... , . ,,. ,,: ,.~ ,., ' . ,,',,,,:,.;, *'i .... '* ., ,.. ..... _ ................. ;' .'i ', ,.' '! ~ :i.!', .'..'~.:. m , . -.. DALLY b/ELL COSTS 5;~607 ~ 240~345 DALLY HUOS ]]05 CUHS 183:356 supervisor: LHL kll II ! I IIIII I II I APR B5 '96 06:~4AM SHP DRILLIM~ MOC P-~×~ I)~TE: C)~l)5~O6 RZG 122D CONTRACTQ~ DCXaNTZI4~ ~ 11.5~ hrs ~ O~ ~T ~ ~ST: ~/~ UZ~ DIRECTLY: ~L~ZTY __ __ ' ~ DIRECTZ~ & HT. - ~ITE 2~ ~ ~ PE~z~ ~ ~ -~LL~ ~. ~T -- ~ PATCH H~ ~T. ~END - ~ ~O. H~ZNG HiLL ~TER U8~ ~T ~T~ ~ PER~NEL ~TA: ~ 2 ~L- 17 ..... NS I E~fl 2 ~~ ~S ._ 5 to ~ TOTAL; 2~ ~ I ~HL~BERGER ~CTJ~ ~$ to TRIP ~S ~ to 92 ~.., ~ ~ ~TES;T~EN O 9~ ft. ~ ~5 O 3~ ~ :~ ?.'~T~:'.~O~IPT'~'~':'~:~:~;:'~ '~.:;::"~ :~ ?~:: ~:':~ ': ~:: :~':' :~.::~.i~'~:it:'.C X: ~ u. ~ SR~ 510 e ZO ~ 1 BiT C-~RG ~5~0 ~.00 ~ 6~ O ~ s~ 1 ,.g~ BIT STABILIZER 6.500 '2.~0 .... ' .... 1 STEEL DRZLL~O~LAR_. 6.500 2,~0 31.15 S~LE ~N: ,, . ~E PRESS: I S~A~ILt2ER 6.250 2.~0 3.~ ,,, -- ~ STEEL DRZLL. ~_LAR 6.5~ ~C~ TENSt~S (1~ L~) ~ ~OSS ~R.~B .... 6.5~ 2.8~ 3.53 .... Z._ 5N 49.3J H~P 5.000 3.0~ 61.70 1. ,, 2. 1 N[CH. 3AqS. 6.125 2.2S0 ~2.9Z 3. &- 28 .5' ~9.3J H~P 5.000 ].GO0 5. 6... . .... 7. 8.,. , ...... ,. _ _ .......... ~LL ... ANGLE OF FSET D t RE~ t ~ ~ , , ...... , ACCTDENTS REP~T~ LAST 2& H~S; ........ ~ ~ INJURED : ........ · ~L~ER ~ T[[ OF AgCtDENT: ........... TOTAL BHA LENGTH~ D~tPT]~ OF ~CZOE~T: ~5 ~ ~T~; ~R NO. ~S ~ HEVt ~1; . flEA. DEPTH ~H~ O[KECTJ~ T~ N/S ~/P ~RT. ~E~. D~ L~ ~8 16.~ ~16.~ 7127.32 Z~.~ -2~26.0~ ~1.2~ 2.022 81~ 10.91 319.56 ~97.25 ~.50 -2~ .53 ~7.2~ 2.156 81~ _ 10.74 321 rBO 7&59.13 21~.65 -ZOO.03 ~9.0~ o.~o ~61 9.58 ~- 320.~ ~49.~ 2118.~ -2089.19 29~.15 1.282 ~ 7.92 319.97 7~I .~ 2~29,19 -2~,22 ~.23 1.~ ~7 6,~ 319.M ~3.~ 23~,32 -2105.91 ~o 5,33 ~6.~ ~.~ 2145.~ -2~2.43 3o~o.~ .~ 2.65 }}5.~ ~19.o7 ~150.~ -Z~ 16.30 3017.~ 3.156 B~ 1.M 16.01 8012.~ 215~.21 -2116.~ 3020.05 1 .fl~ ~19 1.39 355.67 81~,97 2156. ~ -2116.45 ~1.6S 0.~ ~2 q .~ ~53.~ S~97,93 2159.35 -it 16.~ ~.~ ~10 2.2~ 350.00 ~.62 2176.~ -2119.31 3037.~ 0.~ APR 04 '96 06:01AM SHP DRILLING MOC P.1/~ DATE (~/O&[~6 APT ~8 FIELD C.C~EA CREEIC mil N~ CmEA CREEK F;D ~1 ~0 1 RIG 1~ XrE S ~0 D~EST T~T !.~ONEr a _5~ PT~ ~ AFE.~. ~ L~T ~[NG O.D. 9.6~ ~ ~SIRG $H~ DEPTH 2~ ft. S~ TEST ~3.1Q PPG DAYS ~ L~II~ LI~ER 1 O.D. - I~T~VAL ' ft. SH~ TEST ' PPG OATS SZN~ LINER 2 O.D. - INTERV~ - ~ ft. S~ TEST _. ~ ~~D OAY8 LINER 3 O.D. INTE~AL - __ ft. SH~ TEST ~ PPG i E~I~ ~Y: _ ~ ~ Rill UfTH REStSTtVIT~;c L~ T~ ~'. L~D F~ 9~0' TQ 2~'.,,,~. L~ T~LS. RIH UITN ~ENSITY ~T.~ TO 9~0~ . L~D F~ ~0' TO ~'- ~. L~ T~. ~ E LINE. ~LLED ~SHtNGj ~ET TEST PL~. STARTED TESTINQ Q~S. _ .,. , . i , . , ,... i. ~ ~ ~ VIS ,~ ~ 15 YP ~ GELS ~_SZ ~ 7.8 ~ 5 HPKT UL -- ~ Pf~f~~ CL ~OOq C~ ~ I Oi~ X ~IDS 2~ ~NT/~L~]5.0~I?-2 DIILLED 191.~ B~ITE ...... S~ dl S~ ~: T~ ~ PRES~E TOT ~ ~ A~ ~L DP ~ DC ~ CRIT , ,, ,, ,, , - . _,,, . ,, .... lV: BlT pRES~E DRY: ... ~i ItT HP: BIT HP/i~: ROTATING $T~ING ~. BHA ~. ZN ~; ~:, ~ ' ,,. ~ Tffi~E: PI~ UP UT. . ~.. .~,E~:: ,~ '..:::~:~[:.2:,.....:; ~`;~`::.<..~::.~`~:?::;:?~?:~:~:~:~::;~::~:.~8~.~1~8~:..:~]~s~N~..~.::?...~ :.~;~}:.~:?:::;:.:~:~:~::~?.::~..::~:~?~:~?.~::)~:~:?::~'.~:~::~.::~;...:.T~:~::~:~ ~:oo 21;00 15.0o FtMTSHEP AlU ~HL~BERGER. H/U A~ RIH U/ AlT ..DSi NLT ~ ~S, RTH TO E LG - ~t. ~TA~ S~IKING- ~N., ~,~N~D ~. RIH TO ~0~. ~TAGE . . ~I~ZNG . ~. ,CHANG~ TEL~ZTRY CARTRID~- R~H TO 9~0~. ~eu ,, -FK~ ~t~' Iu ~'. ~. '~/G T~_S. {a?~?Ee .L~!g~ .AT ~0~ 21:~ 05,:~ 8.OO~ H~._kOT ~L NGT T~[S AND RIH TO 9~~, .L~EO FRffi 9~' T.O ZS~'. E LG ~H. L~ T~S. R~ ~HL~BERGER. _~:00 ~ 1.00 ~LL ~AR ~SHING. SET TEST PL~. "ST~T ~STING'~'8, E, PT, ..... ...... , · - _ i . -. ~, , . . ~ i .. i.. ...... ....... , i . .,. .., .. , .,, .... .,, .- . . .... ..... ........ . , , _ . ,., .... '" ' ~..'2...~" ' ~ ..... t .,., ~ ~ I .... ., , ~ . , .,, . ,. ~. ~. . ~ '... ~ ,, _ . ... , . , .... ,., ,, '.,~ ...... , '?:,. ~'~,'].".~'"",., .,, , ..... , ,,, ..;~ ~..:; .:i., "' ........ , , , , .. DAILY ~LL ~T$ ~7 ~ 2351~ DAILY ~$ ~ ~ 1~1 S~teor: LHL, il i , , i i , i1 ~ 0~ 'g6 06:08AM SHP DRILLIMG MOC DATE OF LAST BCI) TEST: 0,3/27'/'96 BARITE 28;3 Used 04T. NEAT CNT. BI.EIID Used __ ,- DRILL blATER _______ POT MATER Usecl. FUEL l.~ecl ~D GAS to_.__ CONNECTION GAS __ to TRIP GAS tO NAX. GAS SLOW PUKP RATES TAKEN O f t- PtJHP NO. 1 SRCP ~ O ___ SPN S~CP g -- SPH Pimp i(o. Z ~RCP g --. Sl~ · SRCP O _ ~ RIG 1Z2g COgTRACTOR D(~.BITtK~____ CU~_ 11.50 hfs WZ-~ND D'ZRECTIC~i: VELOCZTY __ ' -- UAV~ DZRECT]OM & H? .... ' .--- gAVE PERIQ) RQLL PITCH HEAVE HEADING ~ VDL ~ PERSONNEL DATA: KOC: Z POOL #! 1 EPOCH TOTAL: Z6 BH Z 1 R&IC SCHLUI4BERGER 3 SHALr DEN: POR~ PRESS: ANCHOR TE#SZC~IS (1000 Lbs) BALL ,JOINT ANGLE OFFSE;T D]RECTZON ACCIDENTg REPORTED LAST 2& HOURS: WU4E OF Z#JURED : EI4PLOYER : ~. ,~:)CIAL SEC. NO. t , TIKE OF ACCZDEHT: DESCRIPTION OF ACGZDE#T: TOTA~ g, HA LENGTH: ,. 14(X~S OH 14OTOR: SER KC). II~URS ON JARS: SER IlO. NGURS Off DC: _ '~?&.O miXeS Off HEVZ I.,r[; 27L.O STATUS OF Z MJURED: ,, ~S& 7:9Z 319:97' ,"1.60 2129.19 '209~.22 2989.23 · 7919.07 8012.00 81(~.97 8197.93 8695.6?- 8965.44 2138.32 2145.70 2154 21S6.80 2159.35 2176.6,?. -2105.91 o2112.&3 -2116.79 -2116.&5 -2116.70 -2119.31 3001.1] 3010.95 30~0.05 3021.65 :~.~$ 3037.6~ 1.172 1.651 1.87Z 0.809 0.A15 0 101 8447 8?26 8819 B912 9410 OTES: 2.65 1.88 1.39 1.77 319.~6 16.01 355.67 353.23 350.00 I'lFi~ ~ 'g~ Ri? l~-~l'll'l ~l-IFi DI:I.'I_LZI,IG blOC ~ATE I~103/96 RPT 37 FIELD COREA CREEK ~LL ~ ~A ~EK ~ gl No ~,, RIG ]~ . .... i ...... : , . ~ ~: - 10 ~:~ ?1,~ 3,ffi ~IgffUiTrh II~r ~C~. kOlO ~ ~ m rlflCT ~ Clfl~TI~S TB~ p Riff, ~ 3 STA~S ~ DRILL Pt~JO ~ VlTH. RE~ED F~ SIDLES TO ...... ~,~ ~oo ~.~ m~. . . '~ ..... ~. , ......... _j ,., ~ __ , ..... DATE: ~c)~_/'I~/~L~ Rln, _I_L)~ (~4TP. AOTGR DOLRI?II~ cUH_ ~.~ ni~ nF l l~ ~ TF~' ~ ~1~ ~IRE~TI~: ~L~I~ ' ~ DZRE~IM & HT. - ~T. ~AT U8~ PITCH fl~ ~ILL ~l Us~ ~L ~t ~ ~ .n~.E~ DATA: ~ 3 ~ Nt 1 E~H ~G~ ~ to TOT~; ZB ARt 1 R~ .... . ,: ~ .: ?.:~ L :::~.:;~2: ~ :~ ~ '. ~ ,. · ,. '. :BNW~:~i~- ?~ ~"~;~'~ ¥ :~:;~: ;:~'~":~ :;;::;~';~' ~' & .Ay ?;'~'" '&'~'~'~' ~": h' ¥ ~'~'~'~ ~ NO. 1 ~CP ~ ~ ~0 ~ ,' ....................... ' .......... ~,'-'"-"-'.' .................... - ............... , ~ , , ,, t i ) . ,,,,.. .,...,.,,,,.., ~ NO. 2 oep ~ a ~ tm 1 itt C.~LRG e.5oo ~ .., - I STE~L DRILL COLLAR 6.500 _2.~0 31.15 S~LE DEa: ~RE PRESS: 1 STABILIZER 6.250 2.~0 3.~ .. i STEpL DR]LL ~LLAR 6.5~ _2._~ 1 ~~VER ~9 6.S~ ..l~U~) 3.53 q. ~. ~ 1 NECH. JAne &.l~ 2.~0 .. 3. ~ &. 28 5" ~9.~ ~P _5,~q 3.000 ~.~ S. 6 7. 8. _. - · -- i ii - · _ , ., i KLL ~llT - ' .. i i i ~GLE OFFKT DIRE~I~ 13 III , , · , .... ~IDENTS RE~TED LAST 24 ~S; ...... M OF INJUR~ : i , ~IAL SEC, ~. : TINE OF ~IDENT; .... - ...... TOTAL.B~A LENGTH: DE~IPTI~ OF ~ClDENT: ~S ~ KT~; ~ NO. _ J _ , ,, STATUS OF INJ~ED: H~R5 m DC: _ ' '"'"""'"~ ~lll~ I I I'1'1¥'1 I'"l"ll'lllfllillllllllllilll ti PgNAk,All~lrr : '~' ' ....... I' I1'11"1, Ii Iiiiii III II .......... .,., ,, . .., ,~ ,inn. '- ....... ~ .... ..., ., ........ ~ ANGLE DIRECTI~ '~ ~~ ~ ~13 12.~ 31&.~ ~.21 2~.~ -2~8.57 ~.~ 2.3~ 8169 10.74 ..... ~21,8o 7459.13 21o5.65 .- 20.~,_03 ~.o2 o.~ ~ 7.92 319.97 T~l .~ 21~.19 -2~.22 ~.~ 1 8447 6.iJ 310-~ ~.B3 21~.32 -71~ 91 T~1 1T 1.1~ .__~3 ,2.65 ~.~ ~9.07 _~tSO.~ -~ ~6.30 ~0~7.~. ~. 156 " B~ 1.~ 16.01 ~12.0D ~1~.21 -2116.~ xa~.~ 1.87Z M19 1.39 355.67 m~.~ 21~.~ -2116.45 ~1.65 0.~ 30~.~ 0.415 ~o 2.z5 35o.~ ~R 0~ ~96 07~Bl~M SH~,,,~LLIM~ i i DATE ~ RPT 36 FIELD _r...l)llEG. CREEl( ~IELL NANE cS)IlEA CK~EI( FED lll No I RIG 1220 _ , , LINrdl 1 O.D. INTE]IVAL ~_ - , ft. SHOE TEST .__._ PPG OAYS SINC~ SFUI) 36 LINER 2 O.D. INTERVAL - _ _ - ft. SH(~ TEST __ PPG PROGNOSEO DAYS LINER ~3 O.D. IlITEIIVAL .____. ft. SHOI~ TEST____.. PPG · .. EX,CUT IVE SUII4ARY: __DRZ. I. LEP FRCXd 9707~ TO 97'38'. C:GU. FtADE ~ll~g TI~IP TO ~?A~t_,, CI~. POOH. HOLE TIGHT FROI~ 7'37&' TO 6169,....gNA. I~I~TIIIEWD SURVFm, Y. I./T) I~)NELS AND t)/V IIEAH[#~; ASSE.I~.i~T, IItH TO SHOE,. -':LIPPED AND CI~T.ORIL~. I.]NE._ JttH. . ,. ,.. .._ , ,.. . .. . , .. ... ,.. 14LN) tat 10.7 VIS 6~ PV ~ YP 2] GELS ~ &7 pH ?.3 UL _Z KPIIT Ut. __ Fhq__ PI/ltl.___/ 0.9 CL ~]_gg_O_- Ca 1~ ~. Oit -'~ SOL]DS 2~_'--~NT/S~.LT !&.O / 5~ DiI]LLED 199._1. BARITE -&9.6 CLI:)/Ic~L) , . , ,, ~ lill 6__0 SPN ltl2 ~ TOT SPtl 12__0 PRESSURE 2800 TOT ~ 520 AkiN VEL DP 269.5 DC /,2&.~_ CIZlT _19 I~IIR 8.500 C-2V,L/I.G ~J~O0 l& 1~ T& ..... 18 _1:3 8.500 -C;2V'LRG B-'500 q4, 1~ 1/~ 2~0 ~:3..7Q ~5,32 9T~8 2...2 UT A E I~ TI) 17 12 8.500 r..-lVLRG BJ-.~gQ 16 ~& t& 511 Z4,.50 20..~5 95283 .3 BT N E 4, la1' PR. Jr: .~58,9 BIT PRESSUIIE DROP; 1.~Q0.5 psi NtT HP: 39~.57 BIT HP/lrtZ: 6.95"3 ., .. ROTATXNG STRING biT. 215 ella biT. IN IgJO: 60 RPII: 1~5 - 13S. SUtCIC OFF blT. 1'~ IdOl: &~ - $__~0 PIC3~ UP UT. 28--5 TORQUE: i:,STAilT'i~l~NT)!::',l :lml~-S ':~'~ ~,'.i :':':'~:'~': i-: .:'~,,,, !i,,~],,'i!,~i.':,~i:.,,,~,,:?,OllEIiATTl)N$: ,t II!'~$£~K_~__K'.,:i.: i::, ':? :,,,::!:! !i:.. ,i! ?.~!~:i..:~.~i~.i..:i.~?:~:~?.:.~:i::~.~:~:?~!:.~::?~::~:~]~/i~.?~.~;~u~i: 06;00 08:~C)t 2.50 DRILLED FRCl4 9707~ TO 9738'. ADT 2._1 HRS .... D DC . 08;30 10;$0 2..0.0 CIROitATED HOLE CLE~IIs ..... D CF _~0_:]0 ]2:30 ;~.00 .u_i_~c_ .2~l STAND blZPER TlltP TO ~8'. O TR lZ:30J 16:~0' &~QO! CTRL'ULATED. A)ID CO~-.-nITIOIIED 14LO..D~.OPPED SURVEY. "PUHPED TLUG. "' ,,, D CF 16:301 22:00 5.50: POOp. HOLE VERY TIGHT AT.~S?&~. 7281~, ?002'..1~1 TO MOIIl( AND RO.TI~TE O T.R THR~.~_.~ HAD (;IVER PULL AT 7.188'. 70~'. 681&~, 62~)1', ANp 6169'. 2~:00 02:00 4,.00 POOH VITN BHA. _ RKTRIEVED StmVEY. L/D HONELS. H/U REAHING A~FHBLY. _O qX# VETH 8HA ..... 02:00 0~:'00 1.00 RIH TO SHOE. D .,TR 0~:00 0~:00 ~.00 _SLIPPEO ~ CUT D~tL~i~.ZNE .... D , ,~t D 0~;00 06:00 ~.00 RIH. . ....... i , i i iii i ii i ii ii ii ........ · ii ii ii , i _ i ii ii ii i lB i _ lin iii · i iii i iii INI I I I II IIm ..... I i II ii , ,, ,, ---~ - - i ii I i il I I~1 ' ~ II II I I I .... [ r' .... ' ' 1 OAILY MELL COSTS 3083~ ~ C~ ~ DALLY 14LJOS .~178 CUl4S ~ S~rv~sor: P_~g _., i ii APR 02 'g6 07:88AM SHP DRILLIMG MOC P.1/1 DATE: 0~/02/96 RIG !2~0 COMTRA~ON DOWITII4E ~ 11.50 hr~ DATE O~ LAST BOP TEST: O~/~rT/96 lalJl;) DIRECTION: VE~OCITY __ __ ___ EVE DIRECTiON & #T. __ ' __ CNT. MEAT Used , P~TCH HEAVE ONT. SLEiO ~ Uoed BA~O. ~ HEAD]#G ~ DRILL RATER ______ used WL ' iii POT ETER Used -PERS~EL DATA: ~OC 3 POOL 1/ FLEL Used NZ 1 EPOCH 3 BAC~ ~AS ----- to 33 ?OTAL: 25 B#! 1 C~MHECTZON GAS to TrIP GAS to NAX. GAs -- -SLO~ ~ RATES TAKEN 0 ~ ft. PUNP MO. 1 SRCP 56~_ · 20 SPN .~,':,' '.....:v:.~?:~:' ..... :....:~;.e#&'!'.,~.u~l~.'!:.'.'.~B::i:.'ii',~ .... -',':~,~":~i:',~ ~. PWqP NO. 2 SRCP 560 ;a 20 sPJ4 - I BIT C-2~V~.RG ~Sq)O 1,Oo SBCP 620 O '~ SpN 1 HEAR il~ STABIL;ZE,~. 6.500 2.~..0 &.19 ----- ., "'1' .STEEL DRILL _r~_LAR... 6.500 2.750 31.1~ I II I ~NALE DEN: POmE PnESS: ~ STABIL~2._ER 6.~50 2.250 3.63 ~ 1 STEEL DRILL ~OLLAR '~t~O0 2.750 ~0.13 : ..... ANCHOR TENSIONS (1000 Lbs) 1 CROSS OVE.R SUB 6.500 ~.~ 3.53 2 5# 49.~d N~P 5.00'0 ].OflO 6~'.~0 1. 2- ~ ~CH. ;_'_~S ,. 6.17-5 2.250 32.92 3. 4. 28 _5' 49.3t NId)P , ~.GGO $.000 5. 6. _ ,, ' ? .... 8. . .. ' ' , ,, · i lei BALL 301UT . · '" nl· l ANGL£ OFFSET DIRECTION _ , . - ,,, .. · · . _. ii i ii mi! II ACCIDENTS t£PORTED LAST 2& flClJtS: ..... "' ~ OF I#~JSEED : ,, ElqPLOYER : .... ' .... SOCIAL S£C. NO. : ...... TIHE OF ACCIDEmT** ~ '" TI~TAL B#A.,LE#CTH: 1031.71 i i DESCRIPTION OF AX:CID[lIT; NGURS ON MOTOR; , SER NO. , ' HGURS ON dARS: ~5.2 SER NO. ~1 , STATUS OF IlidUREO'~' ' HCURS ~ DC: NGURS ON HEVI blt: 27/**.,Q mlBimSmlmnUlmmmmo . ~...........:..:... ~'"' '..'..;.;..'..':.....'..;.:.:'. :..' ~..,?.~, ~... ~: .:.. ......... :?-:,.?? '. ~-,' .... : !'.i'~'. :. ! ;.'~.':!.::i::~:!':!" :~ 'i :~: ',,'. ,'.:. '. J)l REI~TI~IAJ~.:'WI~.' .S,!>',::::.'::: !.':, i'i.:':?i :,, :.:': :':" '?',?:"!/:,'i',i: >i'~'i '.":.: . ,: !!, ' ' ~i!~:!~'ii! i !'~..'i?:?i':ii'~:..:::'.i,:.':.i~ii~;~::.?.i~:i:'i'.'~ i.'~:..~i,i !.':::i,.:. i:.':~,i,:i.::.::~:.:?:',.'"'. ':'.','...~-.~A~::~:A2.~~5~oo.. '. ~ .: '.... ..... · .' ......... ' ........ ' ........ " NEA.~D_ T~ ANGLE DIRE~ TVD N~ E.~ V(RT SEC. 7828 16.70 316.~5 7127.32 20~8.73 -2026.02 2681.Z8 2.022 7920 1&.80 316.57 7215.87 2066.B9 -2043.15 2906.24 2.066 8013 12.64 314.58 7306.21 2082.66 -205B.57 2928.29 2.377 8106 10.91 319.56 7397.25 2096.50 -2071.53 2947'.:)& :;.156 B169 .... 10,7;, 321.80 7'459.13 2105.65 -2079.03 2959,0~, 0.720 --- 8261 9.58 320.60 7549,68 2118.30" ~2089,19 2975,15 1 ,'~' 8354 7.92 319.97' 7641.60 2129.19 -2098.22 2989. :;3 1.788 8447 6.83 319J6 7733.83 2138.32 -2105.91 3O01.13 1.17,2 854O 5.33 316,73 71S26o30 2145,70 -2'112.43 3010.95 1.651 8726 - 1.08 16.01 8012.00 2154.~1 -2116.7~ ~,05 1,872 8819 1 .:39 355.67 ~104,97 2156.80 -:;116.45 3021.65 0,809 8;12 1.77 353.23 819~.93 21S9.35 -2116.70 3023.63 0.&15 9410 2.25 350.OO 8695.62 2176.62 -2119.31 3037.68 0.099 ~ 2.00 .347.00 8~..44 2186.;.3 -2121.2~. 3046.0~ 0.1.0,1 . _ ~;~,., ,-/,,;,.,~ [ L,:,,:~:,:. '..', .'";'-'~, · DATE 0~/01,'96 RPT 35 FIELD ?EA CREEK I~ELL ~ ~'~I~A CREEK FEO dl No $ RiG 12~ AFE S ~71~0 DE~EST T~MT TY~E[ 8 _ 5~ PT~ ~ AFE.NO. ~~ OEPTH C~) 9~T C~) ~ F~E 1~ WS 1~.~ PRESENT ~: ~RZLLZNG AT ~7'~ ~ST ~ING O.D. 9,6~ L~T ~ING S~ DEPTH 2~ ft. 5H~ TE~ 13.10 PK DAYS ~ L~TI~ L]~ I O.D. IN--AL - ft. SH~ TE~ P~ OATS SIM~ ~ LlXER 2 O.D. INT~AL __ -- ft. SH~ ~ST __ ~ P~~ DAYS LIN~ ~ O.D. iN--AL f~. SH~ TK~ ,, ,,,. ~ ~ ~ ViS ~ ~ ~ YP ~ ~LS ~~ ~ ~ ~ ~ HPHT ~__ ~__ Pf~f / 0.9 CL ~1000 ~a 1~ 2Ofi__ 2GZDS 2~ BEUT/~LT 15.0 / 12.2 DRILLED 1~..6 ~ITE r~_.~ CLb/~t) ............... - .... ~ gl ~ S~ ~ ~ ~ 9~ ~ ~ES~E 2~ T~ ~ ~ ANN ~L DP 2A9.5 DC &~.& ~[T 328.7 18 13 .8.500 C-1V~K BJ500 ~4 14 1~ ~ 11.60 17 12 8.500 C'tVLRG BJ-&~ 14 14 14 511 24.50 Z0.85 '~,3 ~ BTH E'~ 16 11 -B~50O ATN GT~ ~ --- ~'&- 1~-i&- ~2 ~.00 ~0,10 ~17 2 I ~ A E [ LT BNA JV: ~ BIT PRE~ DRY: .. 1312,7 ~i BIT HP: _3~,26 BZT HP/i~: 7,018 R~ATiKG STRING ~, ~ B~ W, IN ~; ~ R~: 13},,, - 135 ~OFF~. ~ ~: ~' ~ PI~ ~ W, ~ T~: ~ ';?.~nT::~ ~'.~T~'~:~ :.~_~S. ::~:'~:'.'.' ~.'~.:: :':: '": ..::'.~?;:'.:::~:":":~.:'~.'~:':.~:'~'::;:':~.:~:.'~T T~5::;[ ~ ~?'SE~H~~::'~':~ "'~"?"~ :~:'::;:'~ ::"~: ~'::~' ~"'~'E"~:~;~"~'~':~?~::~':'~:"?'::: :~ ::::'~'::" ~:':~"'~'~ ~:~ 07:00 ~,~ ~ ~ITH DR~ PIPE ........... O T~ 07:~ 10;00 ].~ ~ UITN B~. H~ NEUriX. R~RZE~ ~Y...~IH_YI~_H.~, p BH ~10:~,15:00 5.~ RZN SLN TO ~18~. D TR 17:~ ~;OO 13.~ ORILL~D FR~ ~28' TO 9~7', ~T 11.6 HRS, O DC il .... Il I I mill II~ ,, I ' , ,, ,, , ,, ..................... ,, ,,, ...... .... ~ .......... ~ , .... ,,, DALLY ~LL ~TS '~1 ~ ~01~2 DALLY ~S 6556 ~ I~10 S~isor: P_~_ ....... , i ~-- APR Bi '96 O?:~M 5HH DNiLLi~ r~u~ DATE: 0&/01/96 RIG 122{) CONTRACTOR DOIklN111~ CL~__ 11.50 hfs DATE OF LAST BOP TEST; Q3/~7/g~ UlND DIRECTION'. VELOCITY ~ ~ ' I~AVE DIRECTION & HT. - BARITE Used ~ gAV~ PERIOD ROLL __ _ Dfl'. NEAT Used- PITCH ~ HEAVE __._,_ ONT. BLE~D Ueed BARO. _ HEADING DRILL bIATER Umed ~)L POT I&~TER Ueed R~L ueed PERSONNEL DATA; BlOC 2 POOL 17 __ #I I EPOCH BACIC~ GAt; 10 tO 6.....~.? TOTAL: 27 BHi I ~ 2 -- CON#ECT log GAS to , TRIP GA~ ~ To _~ mx. as · . . SLOg PUNP RATES TAKEN ia 9645 ft. '~-.-vs:- 4-:- :: ....::i: ;;;.r.':* .~ ~'./:':.:-9'HK~..IRA(BER.;:"i-:'.~'?' .... U¥:"::::'"':':!:.': :/!";ii:'!!*'?.'i_':!i.~:' PUNP NO. 1 SRCP 560 ia 20 SPld ~-~'-'*"-~¥'?'~-'~:" ~: t .... . SRCP - 620 g 3---~ SPt4 ..;*:...TOOI;,:'OESC~RIF~T. OH ;:if i'.:!:::? ::,r; ....... · .:',.'.: :'00 ,?i':'::X;:' ::|P '"'." .:,x PLIIP NC). 2 SRCP 56b ia 2'--~ SPl4 - 1 BIT C-ZVI, RG. 8.500 1..00 .... SRC:P - ~)~)~ g :30 SPH 1 BIT SUG 6.S00. __2.500 ~.11 ................... -- 2 ID, HoNEL COLLA~R ... 6..56.~ 2.7~0 60.5~ SHALE DEN; PORE PRESS; - 1 CROSS ~VER SUB 6,75O 2.25O _1.19 -- 1 STABILIZER 6.250 2.250 .3.63 ANCHOR TENSIONS (1000 Tl~) I STEEl DatTt _r~_LAR 6.500 2.750 1 STA~ZLlZER 6.500 2.750 1. 2- ~ CROSS OVER ~_m_ ,.6.5,00 __.~87:S :3.5.1 3. &. ;~ ~# &9.~3~ Hgl)P , 5.000 3.000 61.7,.0 5. 6. 1 NECH. ~R.D.S ,.6.125, i 2.~.50 ?. a .... 'i. ---2fl - s,, ~9~ HuoP 5.0o0 3.0~. ....... BALL JOINT __ · _. , , ANGLE OFFSET OZRECTZC)N .......... ,, , -- , ,,, -- ACCIDENTS REPORTED LAST 2& HOURS: NAI4E OF' IRJURED : , EI4PLOYER : SOCIAL SEC, NO. : Tllq~ OF ACCIDENT: _.___, TOTAL BHA .LEHGTH.; .1 .~.5,1~0 .... DESCRIPTION OF ACCIOENT: HOUX$ ON MOTOR: SER NO, HOURS ON JARS: _36,~*t SER NO, HOURS ON DC: 272.P SIATUS O~ INDUCED: HOURS ON HEVI ~/~; ~7'~,0 ......... ....,,..,.....,: ......... , ........ : ...... ': '.": '.", '. :," i ':':: . :,.:i: .:':' ~; '. i:: '; :":i i':: ::. i': :.i i~ :.':'.i.~ ;:ii .. ::. :'..'. ".: :'...: '..'. ~ .... ~.'. :'.:':' i~ ".:" .':~ ~ ~A:c;:*!:*~ tKrd~t Pt~ANN~O)'." 3~S:::00 . i.: ".. · .:~.... ~...~..r:~ ............ : .... ~ .... N/S E/tJ VERT SEC. IdeA. DEPTH ANGLE DIRECTION TVO .... -7736 18.56 316.88 7039.65 20Z8.41 -Z006,95 2853.&3 O. 7828 16.70 316.75 7127,32 2048.73 - 2026.02 2881 ,Z8 2, OZ2 r920 1/~, 80 ~16.57 7215,87 2066,89 * 20~$, 15 2906.2/, ~. 066 8013 12,64 314.58 T~06,21 2082,66 -2058,57 2928,29 2,377 8106 I0.91 :319.56 T397.25 2096.50 -2071.5~ .29.~7..2./, - -- 81-69 10.7/o 321.80 7&59-.i:~ ~ -2105.65 -2079.1~3 29~9.02 0.720 8261 9.58 320.60 7549.68 2118.30 -2089.19 2975.15 1.282 8356 7.9:) 319.97 76~1.60 2129.19 -2098.22 2989.23 1 . 114J,7 6.ZL3 319.B6 7?33.83 213B.32 -2105.91 3001.13 1 o172 8560 ~.33 316.7'5 .. 7826~39 2165,70 -2112,/.3 3010.9S 1.651 863S 2.65 3~3S.06 7919.07 2150.79 -2116.30 3017.29 3.156 8726 1.88 16.01 8012.00 21S~.21 -2116.79 3020.0~ 8819 1.39 3SS.67 8104.97 21S6.80 -2116./,5 3021.65 0o809 8912 I .T/ 353.23 8197.93 2159.35 -2116.70 3023.63 ~10 2.2S 350.00 ,_ _ ~75.6_2_. 2176.62 . -2119.~1 ~.37..68 ,. q..099 .... - ROTES: , ......... ... ......... · ...... ,, , ...... ,, __ . MAR B1 '96 07:E4AM SHP D( ~'.IMG MOC P.1/2 ii i i ii i · DATE ~ RPT 3~ FIELO CO~EA CREEE ELL NANE CORE& ~REEr FED #1 No 1 RZG IFF S ~ flFFPF,~T T&RFff:T TYONF[ i ~TQO PTVD ~QQQ AFE,Ng, ~ DEPTH CI4D) 95Z8 C1~11)) ~"l& FOGTAGE 228, NOL~S 1&.50 PRESENT OPt PC)ON. _ ... iii . . . ..i . ...... LAST CASING O.D. 9.675 LAST CASING SHQ[ DEPTH Z'~iS~ 1rt. SI4QE TEST 13.~Q PPG DAYS (:l LOCATZON LJlld~l~ I ~,.b. I#T~II:VAL - FI. ~H~ I'E~I' ___ PPg DAYO LZHEI ~ O.D. IiITEBVAL · ___. ft. SHOE TF. ST ~)PK, I~l~ flAYS I lUrB ~ /!.11. lilTI:EVAL ~ fl, I;llgE T[I;T .. m i i i i i __DJttU.F.D FRON 9300' T9 fa~d~5'~ CgU. UTPER TRIP TO.~9~:. DRILLED FREI4 9365, TO 9528'. ¢_RU ANq. DROPPED _ ~4JJ~"VEY. P~H TO SHOE. ~ AT ~FHOE. PO011. . ........ · I I I II I I la Ii ii NUO ~ 10.5 ViS 70 PV 26 YP 32 GELS ~ /,3 pH 8.3 I~L /. HPHT taL PmO Pf/14f ..... ~ 0.7' CL _&600,O, CB 1~K) XOil X,~#IIt.~ 1.._~9 AFkiT/.~LT 1~S.0/__1_4.~ DRtLLF. D 163.2 ~ARtTE-~O.1 __ ii / lei IIII I i SiN $1 60 SIN II~ ~ TOT $1)N ~ Pf. ESSURE ~ TOT GIN 5:)0 ANN VEl. DP 269.5 DC /,36.4 CRIT 373.6 ';!;Et'lkif' .... ,v&~,T~',!,!, i:~4~Lgf,.',! !!,?~,TyD~,'.'.';,;.';.'; ?:-WFfITr'~',tirnYi'~'~ ~'i'i's'i'~llT~i'jq~,~dh'/~',' ';',~RT;;'; ;';~h'~l,'~;',;t ~;~i;,i Iii 1¢ I1'i$ 111l ll '.i78 tll'Jtit ,,,,,,., ,., .,,, JV: ~6~.9 lit PRESSURE DROP: 12~.3 psi lit HP: ~9.~_ Blt HP/if~: &.856 ROTATING ~TAt#G UT. ~_~ n#i UT TM ira- ._~ BiN~ 3,ID- ' ~L_ PICIC UP biT, ~ TORQUE: ':'~'~AK'~ "" ' ':~' :~ " ............... :' ...... '"' ~'~- ..... ' -"'~' '''< ..................................... ,~,"Eill~,, ,~1 .................. ',',',',.-,' ,',.',',',-'.: ... :. ..',-. .~I~T.~, , 04~':,fll., ~'~UI~#~..:; ....................... ......... :.., ..; .;.:.:..;..,,...:.,........:.:.,..: ...:~:...:...:.:...::;'..::::.:' :. O&eO0 I101~i0 &.SO _BII. IL~L,ED IRON O)OOI TO 01&SI. AgT 4 NBS. , 10:30 11:~O 1.O0 _CIR~LAT~D~OLE CLEAN~ D CF _, .-; ........ SE~RAL Ti#ES. REST OF TRIP GOOO. BiN 13:oo 13:~o 0.50 RE~ED TO ~5'. " D 11-Iff ?T.tfl in nn nJlllFn FB~M 9~' Tn 9q~I', lOT 17.& HffS. PFm:TBATInl 8ATt DI?GOPED. ,bIOULD ILtOT B,F~ ,L~B.I..E TO FINISH HOLE VTTH THI~ BTTI ..... o~.~o oq.3o __o.o'0 _e_tne~L~TaB IleLB eLEAU ~,IJB Bq~l~l RunTn:v. .. D of' OS:UO 06:1~] , [:GU AJ~ ~.LJG~n PIPE.'--S'U~kTED F'OO'H J~'~', f_~l~;G,_,. ,',~'r 0 Ii i ii I ,., ,. ......... ii ii i i ii i i i i ... . ,, ,.,, ......... ,, ,. . ,~,,.,.: .,,, . .. l,,.-.~l~ I~.,z;,/ ,/.~.~, ;~ . :11:~,..,~, .;~ , ............ .............. ....... ~ ~ n ~,~ ..... L _ _ ,,,~I.,~ '~ L .._ .......... ~ ~,'.',v'~, 0 ,F~,,,,,, ~'%,'-,,,~'~I!, i . ,, i ' i ii~!iL ..... ~ - - - , . ., , ·, · · , Il. Il II DALLY ~ELL COSTS ,.3801 Ct~ , 2140691, DALLY 14U05 ~8'JS CUI45 16175~ supervisor: PKB iii i M~R 31 '96 07:25~M SHP DN1LLIMW MU~ , , DATE OF LAST ~ TEST: 0~/27/~ ~lID DIRE~IO~2 ~L~ZTY __ __ - ~ITE ~ ~VE PERI~ ~LL ~T. ~T ~ PITCH DRILL ~TER ~ ~L _ _ ~T ~TER U~ " - Ni l I IIIIIIIIII III i III Illll fl~ IIII TRIP ~ TO ~. ~ 191 ~L~ ~ ~TDS T~N a ~97, ft. ~ mo. 1 ~cv 6~ a ~o ~ ;~'~'~:.~::~::j~:~::::;~::~:~::~:.~:~::~:~~"~t~;~:~.~'~:;~:;;~;~'~'~j;~.~:/~7.:~;~:~;:~.~:/~:;;~;:;.:~. ~cP ~ a ~ s~ ~J~Jf~L?bel~l~Tt~.~::~':~'.?,.?::'.'?.";.':.'::.?':'~."?~ ":':x'tX"':":':"m'v'.":'.'"':~'~'"'""[NOT6 ~cP 6~ o ~o sp. ~ SZt ~ ~.soo z.s~ z.~ :- ........... ~ 2 30e,H~EL,COLL~ ~ 2.~0 ~.50 S~LE DEN: ~E PRE~: __ - 1 ~R~S ~R ~8 6.?50 1 ~TABILIZER 6.250 Z.2~O ~,6~ ~CH~ TEaSI~S (1000 t~) 1 STEEL ORILL_~.~ &~500 2.~0 ]0.13 1. 2. -1 ~s ~ ~ 6.50~,, ~.8~ 3.53 3. ' 4. ~ ~,, 49.~ N~P .... 5.000 3.~0., ,~1,70 5. ---~ 6. ~ .~CH.. d~ 6.~25 2.~0 ~LL JOINT .... . , ~GLE OFFSET DIRECTI~ ....... - ........ .......... , ,, .... , AC:lOE~TS RE~TED ~ST 2~ ~: ........ e~E OF l~d~EO : .......... .--~ , ENeL~E~ t ~ . - ~IAL ~:. ~. : ...... , _ ~ ~ ~T~: ~R NO. i , ~TATI~ ~F I~,II~F~' ~fi ~ DC: H~S ~ HEVI ~T: ,'~',~'~'~",'"~ ~'~ ~ .... ~', ~ ~', ,,.,.,,~ ..... ~t,~f~V~ "' ~'YK ....... ::":" ', ..... ' I ' 'l'l ' ' I ' I ' * ' I I I I ~ ~ I ~ I ~ t i i I Hdlllllh~,lhtll[IU~m~*~:['.~:3*~L'~'~b'[?'l~'(~* ~R'~'"[~[/~'''*'*//''~'/*;'4''''''''" ............ ."."*."". ........ Itlli'l'llll' IllHll~l.lllll.lllh, .~,~TH ANGLE DIRECTION ZW N/S E/~ ~RT. ~CC, Doff Leg ~ 1B.56 316.~ ~39.65 2028.41 -2~,~ 2853.A3 0.7~8 ~8 16.~ 316.~ rlZZ.3z go~.~ -goz6,oz ~1 ,~8 2.022 ~ZO 14,80 316,57 ~15 .BT 2~.89 - 20~3. 81~ 10.91 319,56 ~97,25 2096.50 -2071.53 ~.2~ 2,156 81~ 10.7~ 321 .~ Z~59.13 21~.65 - ~.03 ~9.02 ~1 9.58 320.~ ~9.~ 2118.30 -~89.19 ~ ?.gZ 319.97 7~1 .~ 21~. 19 - 2098.~ ~.~ 1 ~? 6.8.5 319.86 II~.~ gl~.~g -Z1U) 8540 5.33 316.~ ~30 - -2145.-70 -2112.43 3010.95 1.651 ~ 2.65 ~5 .~ ~19.07 2150. ~ -~116.~o 8~6 1 .~ 16.01 ~12, O0 2154.21 -2116,~ 30~, 05 ~1~ ,1.~ ~.~ e197.~ ?~sa.3s , :732~:~,.. ~TES: ..... i .......... , , ,, ' _.. ......... - : - .. ... .,, , .... MAR 30 '96 08:EOAM SHP DP"LIMG MOC P.I/E {" ,. ! · mm · mm Iii i I i I I I ~ II L~T ~Sl~ O.D. Y,b[~ ~1 ~il6 W UtPlfl ~h! VT. ~ ,~U, !S.'~A ~ u~ w ~TI~ . LI~I I O.D. I~V~ ..... - __ ft. S~ TEST ~ DAYS SI~ LIaR 2 O.D. INTERV~ ' fT. S~ ~ ~ PROD LINER 3 O,D. INTOV~ - ft. ~ TEST ~ . . ~l~ Itt ES'. REKp TO ~17,. DRILLED ~R~ ~17~ TO ~. . ...... i ..... .............. ~ ~ 10.( VIS ~ ~ ~ YP ~ ~LS ~/~ ~ 8.0 ~ 4 NPHT ~__ ~ Pf~f / 0.5 CL ~ ~ 2~ 2 OJL ~ ~LIDS 1~ BeNT/~LT-~~I&.6 DRILLED I~5.B ~ITE i .. imm. ~ Jl 11~ ~ ~: T~ ~ 11~ ~S~ ~00 TOT G~ _~65 ~N VEL DP _251.~ DC ~07.0 CRIT ~.6 :~:~ :J~TtJ~: ~:'~'1~~,~?':~.T~[~B~T~%?:~]~:~ ;~~'~ ........ ~ ...... ........ 17 12 -~50O ~:1~ ~ eJ-L~ 1G l& l& ~_ ~', 12.10 ~.~ l& ~11 ~.~ ATN GT~ F~ 1G l& l& ~2 ZO.O0 ~0.10 '_'~17 '.~__'"1 UT 15 'RR~IR 8.500 ~-TI2 Q11~Q 56 9.50 5.~ ~5 Jr= _~_.t DZT Pflc~nc Dfl~e lq~.9 pi DIT liPA Xl~.~ D~T XPli~, i.tlO i ii i i mm i ~:uu w~ 3.~u ,ahA. LID ~IW. PlU NaM ill. MILl W IIAUi. . ...... ~=30~10:~ 1.00 RIN TO S~ .......... D TR 10~0 ~1~].0 1.09 OLZPP~ ~ ~T DnZLL ~]H~, .................. D 15:00 1~:~ 0.50 R~ FR~ ~' TO ~1~'. ~ ~ .' I I I . .. i i i ii i , II I I .............. .......... , ...... * . .* m I _ __ ' ............ II . ,, I III : ~ , '. ,,.-~, I II ...................... . ~........ .... .--...~--~ i . , , r', ~,,n~ ,~,.,~ .~ (~.., ,~' j. ::,".~ ~ ... . i ............. ~ ii i i ~ ~0 '~6 UI:I:}-'IHF1 bi-Il-' UK.I. LLII't~ i'~u~, DATE: ~13/'J0/06 RIG ~'_,~:) CO&ITRACTBR BOi, MTli4[ DATE OF L~T ~ TEST; 0~/27~6 gl~ DIRECTt~: ~TY __ __ ' ~]TE ~ ~ ~R]~ ~LL DRILL ~TER ~ ~L ~ ~TER ~ ..... '" ~L ~ed ' ~ER~NSL DATAi ~ 1 , ~CTIM ~S _ to ~IP ~ to ~ ~. ~ 191 __ ~ ~ ~TE5 T~ ~ ~ f~. ~ ....... . ............ :, --~.~.~:.~ .?.:.~:.:.~F.,....:..,......,,,.,.,.,,,,,. ........ .,,,,,-.,,,,,:, :.. t~."'~E~ [PTI~,,"":":" :'::',::::',:''.'''''':.' :':" ":; ':'~::''.::~: .......... , 1 gTEEL_D.RJLL ~LLAR &.~00 2.~0 ~0.1~ ~CII~ T~N~Z~C (1000 L~) I STABtLtZER ~r~O0 1. 2. __ - 1 C~ ~ ~m 6.S00 _ 3. - &. 2 5- L9,3~ H~P -- 5.000 .3,00q ~1.70 . 7. ' 8. -_ ~ S". ~9,S~_H~P_ ~.9~ S.O00 ~.~6 __ .. . .... ~LL dOl~T ....... - ,. ABlE OFFSET DIRECTI~ ....... , . , ,,, ~CIDE~TS RE~TEB ~ST 2~ ~S: - - ~k~ER ; ...... ~IAL SEC. ~. ~ TI~ OF ACCIDEUT: __ _ ........ TOTIt grin I.~u"~,- '~6~.~ - -- -' · ..... - ,~s ~ ~.. ' ~TA~s OF ZNJUR~; ~S ~ gert UT: . ..... , ~ .... ,:' '..,; :.'.,:.,.,~ :'<~:~i:~:~:~:~t/:~:.:~:?::~:~?~):~?t:~~:~;~.~ .". '. ~':::~<~"¥':" ...... :"::':'~;' ~': :;':' ":"?':'¥:;'":'~::'.:;~,';' h,'~ ~ :; '; ': ';? '"" ~ '~',,':,' :,':,'i:(h',~..~ ' ' ~ U~, "" r' . ', ',~:, ' ' '~','.~,.,...,,4..,.' ....... ' ..... .,,.,. .......... .,~ ............. , ....... ",~E.,,~2 I~ a~~ s ............... ~~`~¥~"'~*"~¥~?~¥~'~'~'"~"~'¥~%~%~'6"~'~"~?"~'~"'~'~ ' "'"'"' .... r · ~ · - - · ~A. DEPXH ANGLE DIRECTI~ T~ ~ ~ ~ 10,~ 316,~ ~39.65 202B.&l -20~.95 2~3.~3 0.7~ ~1~ !~.~ ~14.~8 ~.Zl .~.~ -~sg~.If ~fffl.~9 ~.3~ I1M 10_91 "- ~lg.s6- ~g~.zS" 2~_50 .2071.53 ~7 8169 10.7G ~21 .~ 7~59.13 21~.65 -20~.0~ ~9.~ 0.~0 ~5~ 7.~ 319.97 7~1.~ 21~. 19 - ~8.2Z 2~.23 1 ~7 6.83 319.M ~3.fl3 2~.32,. -2~.~.9~ ~O 5.33 316.~ ~6:30 .... 21~5.70 -211Z.~ ~I0.~ 1.651 ~ Z .6~ 335 .~ ~19.07 2150. ~ -2116.30 ~17.~ ISle 1.39 35S.67 .1~.97 2156.~ -7116.As ~IZ 1 ,~ 353. ~3 B19T.93 2159.35 -21 !.6...~ 30~. 63 O. B~ES: .... ,., ..... .... M~R ~ 'D6 O?:BD~M SHP DRI~LIM~ MOC i,~, II , I DATE 03129/96 RPT 32 FIELD i~)REA cREEK UELL KANE COItEA C~tJEEIC £EO #1 Mo I _ RIG 1221) AFE · (7~71000 DEF~DEST TARGET T¥ONEIC · ~7T)O P'I'~M ~CIO0 AFE.IIO. DEPTH (ND) ~17 (1~0) ~ FOOTAGE 439, HOURS 1~50 PRESENT OP: gilA. LAST C~SING O.D. 9.&75 LAST CASING SHOE DEPTH 2563. ft. SHOE TEST ~ PPG DAYS ON LOCATION 32 LINER I O.D. INTERVAL - .----. ft. ~ TEST _ _ PPG DAYS SINCE SFt~ LINER 2 O.D. IMTE1WAL _ - ft. SHOE TEST PPGPROC;aIOSED DAYS LINER 3 O.D. - ' ' INTEBYAL - ft. SHOE TEST PPG EXECUTIVE SUI414ARY: ORILLET) .FROPI 8578' To 8740'. C_m~_....VIPER TRIP TO 7965'. DRILLED TO 9017'. CBU; POOH. BHA. . ,, .,- .... .. , ,.. ... , --- · .. .. · .. . ..,,, , ....... . , . ... IgJO WT lO.& VIS :76 PV 25 YP 3? GELS 2_~/_d~ pH e.O UL 5 HPNT Ui.__ I~n O Pf/Nf___/ 0.6 CL -4~000 Ca 1t~-"'0 ROiL __"~SOLIDS 1_.z ~NT/SALT 12.5_~-1&.8 DRILLED 139.--~ BARITE-27.I ....,, . . i 5Ptq 'il 55 SPN gZ .55 TOT SPN 110 PRESSLIIE :3000 TOT GPN 4,76 ANN VEL DP ~&6.7 DC ~88.5. CRIT 38,B,.4~ i'_~#! ."._BITi~:!"I '::-~JI2E:!:'_:!i'~..:!':'.:-:IN'PE:':!.:'::i:! i?:ii.'"'"$E~t:l~i:i'l~O,'i:'? .f':'..-dEl!(32'~*)?.i:: ',:?~EF~Ti.?:t!'.:::HOU~S'::!:i':::':FT:/141E~;5:J!!:~(~'Fi}~¢ "%!::!:'._..O.':.:_J. 16 11 8.500 pmlN ~T09 FO6C~dI_ 14 ]4, 14, 802 ZO.O0 4,0.10' 9017 Z 1 .I,~r, A~ E I LT BHA 15 RRCB1R 8.50b SC-?1:) 011TT40. ~ .%,50 5.89 82'15 iii 11 10 B...5_00 C-IV~RG e_~GD8 ._ ].~ 14 14, 190 Z0.55 ~T.G& 8155 2 3 ..CQ Cl:) F 1 CD (:P JV: 337.7 BIT PRESSURE DROP: 10'J9.2 p&l BIT NP: 2~.16 BIT HP/in2= 5.18& ., il l ROTATING STRING I~T. 20S BHA IdT. IN I~D: J RPII: 2QO__ - ZTO SLACI( OFF liT. 6.~ U(~; ~5_ - &__~O PfC% UP I/1% 26~ TORQUE: 0~:001_1_1;00 5.00 DRILLED FROI4 l~.7~, TQ (1740'. ADT 1.9 HRS, , O DO_ 11:001..1.2:00 1.O0 ClitCJLATED HOLE,.CkF~N. ..... . D CF.,. 12:00. 13:30 !.5.0 ~IPER TRIP (8 STDS} TO 7965". r__~_. Um~L/mD 40' TO i~.~[.T(~, . D TR 13;30 :23:00 _9..50 DRILLED FROIn 87¢0' T0.?01.7!, ADT 7.1 HaS. ... O DO .~I:C)O iO0--3n '1.50 rIRm[ATED HO.LI~ CLEAN .... ...... D TR 00:30 0,~:00 4,.50 POeH I, ItTH..J:)II:ILL PIPE. ~,,'ET .... 05:00 06100 1,QO POOH I~IT# BHA. L~.D._.M~), ~) ..... .B. .,- '"" _ _. . il ..~ -, ..... .. u ~ .., __ _ , mira ... i i,, ., ., ,,, . ,mill iii p_ . .,il · . ,ill , ,.. -,- . _ __ , . · . .. ..... ..,. , , , .... _ _ . , , ...., , .... .. , ..... N ~., , i ........ , ',':~.' ~ ~ ' .ii .. ....... .... ..... .......... - ......... i" I'l?[ fh"'"'~' ~- --- '" .. ., . ....... . .. . DAILY I/ELL CQSTS ~ CUN$ 2059085 DALLY NUO$ /.359 CUHS .15AJ)3Z SUl~rvir~r: PICB, I I I II FIHI~ ~ '~Jb I~F;41~HFI bt-iF IJK~LLIPlb I'IUL. DATE: ~ RIG 122o CON1'RAr'TO~ D(::NNTINE~ DATE OF LAST BOP TEST: ~ UI#D DIRt~:TIOfl: V~LOCTTY ~ ~ I/AVE DIRECTION & NT. - BJU~ITE 363 ur. md P- t/AVE PERZO0 ~ -I~:)LL~ ~ -- ~ HEAVE CHT. NEAT Used P~TCH __ CNT. BLEND L~ed BARO. HEADING DRILL gATER . Ur. ecl VOL POT UATER USed .... FI. EL -'' LMed PERSONNEL DATA-' 140C 1 POOL 1'~ NI 1 EPOCH .... BACI(GIU3UIID GAS to _13.1. TOTAL: 2~ BH! 2 R&K CONNECT loll GAS to l'~ZP GAS - to SLI:~ ~ ~ATES TAEEN g B?AG tr. 'i~:: ": ':'~:':'""":":::'?:': ::'~: .... ~.: ;...'.i iiltA,'NIMBEI~:..ii: :16'."?'!::'i~',' !i:ii.'.'?J: .:/,,.iLiJ.?:::": .... ~. ~ nc, ~ , ,,~o sm ~..:~o~-i~;~o,';:F.,:..~::~:::::..:.-.....~.:m~;::: ~ · --- , , . .... *- . SRCP 700 g 3o PUHP NC). :) SRCP 610 g :)0 SPfl ., ~ lilt ATI4 .GT09 B.SO,Q 1.00 sRcp ~ ~ 3--~ spK ~ MOTOR ~_~0 MC1 .~,2O~G ~,~750 .~C)~97 _ .. ,,. ~ ,,, 1 (:Ross C~R ~-~ 6.75~J Z.~5.0 1.t? SlLM. E DEN: pOlt£ Pg~SS: 1 .~.TABILIZER --~.938 2.8~ ._------- ..... 1 HEA$, taHILE"DRLG, -._ 6.-'",1:3 2,813 _3~.16 ANCHOR TEMSIONS (1000 trig) 1 STABILIZER 6.2~Q 2.7~0 2 STEEL DULL CO~C~i~', 6.50p 2.~'0 1. .. 2.., , -'1 __CROgs oVER SUB 6.500 2.813 3.53 _ 3. - -,... &. .----- -- 2 ~" &9-21~ HUI)P 5.000 ..3,000 5. 6. 1 P, ECH....JARS .. 6.j~,SO 2.81.~ 32.9::' ?. 8. ~ 27 S- /,9.3# m,~P ... S.O00 :S.O00 86,3./,~. , -- .,. - _ ,., -- ILI~LL JOI~T , "" · ANGLE OFFSET D~REC'f ]C)N ,.. .,. .. , , · · ._ ... ,,, _ ,. ,,. , , .,. , ACCZDENTS REPORTED LAST 2/, HOURS: _ ' ....... IIAIE OF ]NJUREO .. .... ,, ,, E#PLOYER -. , ,, _~ ,,, SOCIAL 5];C. NO. ; . . TZgE O~ ACCIDENT: ,, ' ..... ~AL ~ LE~';T,: , DESCRIPTION OF ACC]DENT'. NOUR$ 011 HOTOR: 66.0 SER No. 111 - " "-- HOURS ON JARS: 69..0 $ZR NO. 00~l_ ........ , -, ~-TATUS OF ]#JURED: ' iIOLIRS 014 Dr-: 2~5.0 HOJ~S ON HEVi UT: ~ ~ .. ---,-----. ~ *:' "! :": ?'*'*'?:: ~.. '...~: ..! :.;... :... ........... ;-'.,!~i..Li..::,:,'.;2' .... ' .*'. i ':~:": :, i ,li ':..:: ':, ?:'*!",: '! ::. !;:! .'.,:: ....... i'.~::.~'*'!'::.:iD/R/~CT,][OI/AL"i:.~L] ~ .~,:,~ i':*~,':,:..': ,:'.,.:'*:..". : :* ,*.:',',:..:'.:.'.',.:':!'.. :.": ::': '"',*:~"i ."' :','*.:.'. . .. ..... ....,..... :..... . .... , . ......: · .......... . ......... ....... ., . .~.:. d . . ..... . ...:....... o ..... :.. .':?.~?!'~!.!*':':*:':.i,:':~?.Fil.;: F . :'.:: .:, *:.".. i ' :"'.-. :' :/'i":.': i.~!.~i.::,i::**~:.'::" ~:~:.": :..:".: ":' :'"'.' :':: :.:.".:::; 1 ~b!AZlt4t~ ~ ~ .................. ~-~.~.~ ~. ~ ....... 7920 1/,.80 316.57 721~ .87 2066.89 -20~.1~ 2906.2& 2.066 - -8106 10.9~ 319.~ 7397.z~ ZO~.~o -~o7~ .5~' ~?.'2~ ~169 ~0.7~ 321.80 ?/,59.~ 210~.6~ -2079.0] ~9~9.02 0.720 ~261 9.58 ~20.60 7~9. &8 211~.~0 - 2081. ~9 297~. 15 ~ .ZSZ A~ ?.9Z ~19.;? ?~1.60 Z~29.~9 -~098.21 2989.~ ~.7~8 8~0 5.*~-~ 3~6.~ 7~6.30 ~/,S.70- -2112.~3 ~0~0.9~ 1 .~ 8633 2.65 335.06 7919.07' 2150.79 -;H16.30 3017,29 3.156 8726 ~ .~8 16.0~ ~$2.00 2~ 5/*. 2~ -2~ ~6.7~ 3020.05 ~ .872 8819 1,39 355.67 8104, .97 2156.80 -2116,/,5 3021.65 O,B09 B912 I ..~. 3.$3.2~ 819'/,93 2.159,35 _-2116.70 3o2.3.63 0.415 ~OTES'- .___--- i i i i ! i i ii iii MAR ~8 '96 07:53AM SHP DRILLIMG MOC P.~/1 , · DATE 0'5/28/96 RPT 31 FIELD I~:OEIEA CREEK: UELL liA/4E COREA .CREEK: F.E't)_lil~_ NO '~ RiG 1220 ~FE S ~ DEEPEST TAROLrT TYONEK a 570__.~0 PTVO 9000 AFE.NO. 6600698 DEPTH (HD) 8~;7~ (TVO) ~ FOOTAGE 3.__~ HCXIRS 11.50 PRESENT OP: DRILLING AT LAST CASING O.D. ~ L4hST CASING SHC~ DEPTH ~ ft. SHOE TEST 13.10 PPG DAYS ON LOCATION LINER 1 O.D. . . INTERVAL - ft. SHOE TEST .... PPG DAYS SINC~ SPUD LINF~ Z O.D. INT~RVAL ' ~ fT. SHOE TEST PPG PROGIIOS~3 DAYS &._.~O LINER 3 O.D. INTERVAL - ft. SHOE TEST PPG ................ EII~CUT IVE . _1~__14_. __L/q) C~E. TESTED BOPE. P/ti DIRECTIONAL R#A_ANI)_KII4~O 8~2~. R£AJ41~D FRON 81&:)' TO 8~5~. I:)RIttt~, PITON 8215' TO 857~,. _ ....... m. ,., ........... lgJO ~IT .10.3 ViS ~ PV _23 YP _~ GELS ~ ZD pll 8.1 ~ __~ #PHT ~IL Pm 0 Pf/Iqf /..0..7, Ct &~OQO Ca 160 X O! I 2 SOlIDS 1_..~ BENT/SALT 14,.0 / 14.5 DRILLE'--"D _'126._"~'_ BARITE -23.7 ._ _ SPI4 dll _.~ ~ ~ 55 TOT SPH 119 PRESS~IRE 3000 TOT GPI4 4,76 ANN VEL DP 2~6.7 DC 358.5 CRIT 378.9 ,,4,...:,---- . , . . - =: . ;. , "...."!.. · , · f:' ;;.;. 'Jtt~h~:q:!i'STTtTi~..': :::S~z~':'.~: ~...:..~T~G.....:,,_.... 5~RTAf~:.:NO,'..L~:~.:,:.,?~IETC.~2,.~r}: I:~'.FEE'I~:i .~'.H~_lR$::ii ~_F_T~IR,:~!~.!O£F!~!!: i6 11 8.500 ATN GT09 F96C'H l& l& l& :5~831 g. O0 &0.13 ..... 15 RRCB1R 8,~;90 e,;:-71:~ Ql177~.0 60~ _9;~0_ 6.31 __14 !0. 8.500 C-IVLRG__ BJ608 1'ti 1& '~'(1' &90, 20.55 23.&t. 8155 2 3' 'CD C12 F 1 CD .C:P_ JV; ,fi'S?.? BIT PRESSURE DROP: 1_04_9.0 psi BIT HP: 291.~3 BIT KD/in2; 5.1:5& .. ROTATING STRING IJ1'. 200 BNA t/1'. ZN HUO: 60 RI)H: 70 - PICIC UP m. 25_.~5 TOECiUE: ,__QG~_QQt_OG,:,,T.O 0.50 POOH ~ITH BHA. D 8N .... O&:]OlO8:O0 1.50 L/D CORE AND CORINg, TI;{~,~:,, REC:OVl~REI;) 55.1' OUT OF 56' L'OREO. D ,DH, 05:00 11:30 :5.50 ,TESTED DOPE. TESTE1) ALL RAHS. LINE"~ AND_.V..4J. YES 25_0/_S~_Q_0 psi. ANNULAR D PT ;~50/2500 PSi. . ....... .11:30 13:00 1.50 BHA. P/U HO]'OR. AND 14Id). - ......... 0 8N .. 13:00 16..3~01 3.50 RI# UITN DRILL PIPE TO 8182'. . ...... ~} TR l&:~O 18:~0 2,00 P/U ICELLY ANO RI~M41~D FROH ~1&2' TO 8~15'. . .D.. 18::50 O&:O0 11.50 DRZL£ED FROIq 8215' TO 857~'. Alit 9 HRS. , D. ~J) i ....................... _ ......... . I ii I . i ':~b'.~.1' 3':'~-~' i';; :>i:'"='"' '= .,.~.. '~.', ........... '" 'r --- * ..................... . , DALLY ~/ELL COSTS &5606 CU~ 201825~ DALLY HUO$ 5STY CUNS 1&~T3 Supervisor: PlC~ Ul I I I I ~11 I I I I _ DATE; 03/281~6 RIG N22~ .. CONTRACTOR DOUNTII4E tx,Id _ !~.~K) hre DATE OF LJLST B~P TEST; 03/~7/96 IdlUD DIRECTION: VELOCITY ~ ~ - ~ UAVE D~RECTION & HT. - RAJtITE Ll~ld NAVE PERIOD _----- ROLL CHT. NEAT Used PITCH .. HEAVE CXT. BLEND Used- BARO. --..-- HEADING...__._ DRILL tdATER Used I/DL POT UTTER Uud _ - - '' FUEL U~ad PERSONNEL DATA, 140C 2 POOL 17. ..... #[ I EPOCH gAl~klO ~K~ to ,,.~513 TOT&L: ~ 9HI 3 It&ii g~JNECT ION GAS to TRIP GA~ to 1....~ ._ ~Og IqJHP RATES TAI~N .~ B&9~ ft. S]tCP 590 · '-~ SPIq ~:~...~DE~CR~p.T~N!!i~:::~:~::~:~::i~i~:~i?~i~i~:.~i.C~.~!~i~:~i~ PUHR NO. 2 SRCP &"~ g 20 SPI4 1 pit AT# GT09 ..8~00 1.00 ~RCP ___5~9~ a ~_~ SPM 1 140?OR A)~O ~-1 1.~EG' 6.750 20.97 ......... -- -t CROSS OVER ~.e. 6.753 2.250 ,,1.19 SHA~ DEN; POiIE P~ESS'. ~ 1 STABILIZER S...9~.~ ~.07~ &.91 -** 1 KER$. t~HZLE DRLG~ 6.~.1~. ~,~13 36.16 ANCHOR TENSIONS (1000 tbS) ~--__ N STABILIZ~EK 6.250 2.75,0 3,63 2 .$.TEEL..~).RILL COLLAR 6.500 2.750 ~. 2. ~ c~s ovER .sue .... ~.500 2.e1-~ ,3,.~ 3. '-"- 4.---- z 5~ ~9.3~.Te~.p 5.000 ~.000 . 5. ~ 6. 1--#ECH. JARS 6,~0 2.813 3~._9~_ _ _ _ BALL JOINT ,1, ~ ANGLE OFFSET DIRECTION ....... ,, ... , ACCIDENTS REPORTED LAST 2& NOURS: .............. KA~ OF INJURED : ..... . ....... EI~LOYER ; _ _ . ........ TII~ OF A~CIDENT: T~TAL,,B. HA LENGTH; DESC:~IPTIOll OF ACCIDENT: Ho~s ON nOTOK: ~5.0 SER NO. ~]1, .. ................. NQLIRS ON JARS: 58.0 SIR NO, 1~31 ~TATILq I1F IM.IIl~Ffl' - .... BOURS Old DC: HOURS ON HEY! T/T: ~ , , '~:~?;~',:~L'.;;~:;'~'~;,'.,',...,',...',....'.'.',,:',',','.':.':.'.;,', ..... .,,,',,'o,...~. ,',-,-0-,',,,',,',,,,,, ~ ....... ~ , ' ' ' "~,.. '" '.~ "':' ":':"",:"'"'r.'":'.".'"~.'.7.: ': ' ,':.' ' .'~':' "",'.',~' ", ...... ,"~.' MEA. pEPTH ANGLE DIRECTION TVI) N/S E/g VERT. SEC.. ...... po~ LL~I 7081 26.04 319.73 "6~T3.13 18~8.98 - 1839.21 2607.~5 7175 26.0] 31&./~$ 6517.59 1879.6~ - 18~6.76 26~9.1~ 1.531 72~8 23.60 317.73 6&02.00 1908.25 -1893.35 2688.15 2.676 7561 22.16 315.02 __~6R?.68 193~.~ -1918.27 272&.27 1.918 T&53 .... 21 .C)5 ~16.16 6773 .?;~ 1958.62 .... _"_19& ~_. 90 2758.14, 1.290 '?582 19.69 317.56 6894,. 15 1991.37' - 197'Z.69 2803.02 1.1:~0 Tr~,6 18.56 316.1m ?039.65 2028.41 -Z006.95 28~3.t,,3 0.74,8 ~B28 16.70 316.75 7127.32 2o/,8.73 -2026,.02 2881.28 2.022 7'920 14.80 316.57 7'215.8'7 2066.89 -2043.15 2906. Z& 2.066 ·. ~01"} '~2.6,t. 31&.58 7306.21 208__Z..._66 -2058,57 2928.29 8106 10.91 319.56 7~97. ~ 2096.50 -2071.53 L~47,24 2.156 8169 10.74 321.80 7&59.13 2105.65 -2079.03 2959.02 0.720 6261 9.58 320.60 7549.68 2118.30 -2089.19 2975.15 1 ~354 7.92 319,97 7641.60 21L'9.19 -20~.22 2989.23 1,7'08 8~7 '6.8~J 319,1],6 7733.83 2138.32 -2105.9.1 .... ]~001.13 1.172 NOTES: . . . . .,.~, , i , . .. ................. · ,., .......... iii ~ i i M~R ~7 '96 05:58~M SHP DRILLIMG MOC ( DATE 03/Z?/96 BPI ~0 FIELD CCXZEA C..KEEIC _ ~,t~LL IlAJ4f: C:~REA t~EEI~ FED i~1 Iio .'~ RZ$ AFE $ ~ DEEPEST TAliC;k'T TY~tlEl: ;a ~700 ' PTVD 900~0 AFE.J~). ~ DEPTH Cl~)) 82~!5 CT~O) 75~ FOOTAGE 60 KCXJRS 10.0_.~0 PR~SEJiT CS): PCX)q ~iTH CI~qE _ , i ~ ,. lAST CAStiiI: 0.I). 9-j~5 LAST CASt#G SHOE DEPTH ~S~3 ft. SG TEST 13.10 PPG DAYS ON LQCATZON LZNER 1 O.D. INTERVAL - ft. sHOE TEST - .i PPG OAYS SZIlCI~ SPUD LINER Z O.D. INTERVAL ~ - ~ ft. SHOE TEST - PPG PROGa~SEO PAYS - - ft. SHOE TEST PPG LINER 3 O.D. iNTERVAL _._.. ,. , i ii I EXEI:UT IVE SIROMRY: FIIliSHED L)Ck~H, p/~J ~11fG ASSG~GLY AND ~itl TO ISl.lOe, REAIqET) Ql10' T.O ~155s. ..~- CORED FRC~I.8155' TO 8215', CBU. ~. _. . .. · · · , i i I I i NUO VT ~ VIS ..A3. PV 25~ YP :55 GELS 1.~/...~ pH 8~. ~1- 5 IlPHT Id...._.. Pm 0 Pf/Iqf.___/ 0.8 el, ~ CA ~ 2~ OiL ~ SOLIDS _16 KIlT/SALT 'I'S.O I~ ~_2~.t.~ DRILLED ~ BARITE -23.B , i "' 5pfl #1 ___ SI)N il2 ~0 TOT SIN ~ PRI~SSURE ]900 TOT GPM _29~. A#N VEL DP ~ OC: ~ CRZT 381.6 15 IRRCB1R~ e.500 SC-712 01'J~,~) 6O 9,SO 6.31 --'1';," 0 8.SOO C-IVLRG D,f~ 1~ l& 14 &90 .~O,5S .53.fi& 8155 :~ ~3 C~) Cl;) F ~ CD CP.. 15 t~9 8.5.00 HP~IG. ~.7'~ ;13_T3 1:5 13~ 11_,Q0 lZ,.le 76651../* & eT A E t.LT PR JV: 1Q3.1 BIT PRESSURE DRIP: 97.7 I~t BIT HP: _ l~.S& BIT #Pli~: ~ i , ., ., l ___ .. IIOTATZlIG sTIIXNG VT. 195 BHA UT. IN PU): RPI4~ 60 __ - ~ SLA~ OFF UT. 1~_~5 ~,: 1_~5 - ~_~0 PIC~ UP UT. 2&._.~5 TQRQI~: __ o6.~o0 ~6:~o o.5o1' F'IIISHED P~---~ ¥1 '~P" D 06.-.30 O8:OO .'1,501 BJ~A.'LID lqUD MOTOR, STAD-~,_ Id~J). 81T..HAP TI30 V~KY L£(~E ~ES AFTER f3NLY ' C) OH 29.5 HK~ ON BOTTON ...... D, BN 08..00 10:001 :).OO K RR~8_~i~R _A_~ ~rr~_..l~N6 A5SEI~iILY, ntil bi _9HA. 10:001 13:~0 3,50 RtH.~/ DP TO ~119' ...... o .,Tn ...... O CF ~&:O0 IIS:O0 1.00 CBlJ .. . . '15:00 15::50 O,_SOI P/U 10' 'PfkJP, DRC~.~) BALL. . I~ OT -i5:~S0 01;30 10.001 C~ED F.K~ 6155' TO 8215'. ADT 9.5 HR$ ..... D CO 01:~30 0~:00 i.50' ~, ~;~-D gaY JOB. BLCXJ _n~flL~qi_ ICELLY.. . GJ CF , ,, ' ' O TR -- o:s..o0o6:..OQ :5.o0~,_--_~ ...... i I I _1 II I III iii il , _ · · I II ... i i I I · II II . i , ~ · iii ... . iI I ii - _ .., . ,,~'/r .,~ '[~i ~'" '~ "!! ~, '; - , i ... ,. _ .,i · - " -- - ' ....... '!i ~';, ~" -~"~ '~'" ,,.I .. _ {", I'"1 f'll~l' I I~1 ..... ~ , DALLY bELL COSTS ~ ClJI4S ]~)7'~A~9 DALLY MUDS 1611 ClJqS J4&~a6 Supervisor: L~IL i i L i i ii MAR 27 ~96 05:59AM SHP D~iLLiMS nuu DATE: ~ DATE OF LAST ~ TEST: BARITE u~ed D4T, #EAT Us~ DRILL ~TER , _ u~ ~T ~T~ ~ Ue~ ~MECTI~ ~S ~ to TRIP ~S to ~. ~s SL~ ~ RATES T~N g ~ f~' 20 SRCP A~ SHALE DEN: PO2E PRESS: ____ MICKON TENSION"' (1000 Lbs) 7.~ 8..___ gALL JOIMT A#GLE OFFSET DIRECTICgl HEAVE _____ 3 Mdl: RIG 1Z~o COMTRACTOR Do~ltlTtM~___._ CL~4~ hre WtKD DIRECTION: YELCX:tTY WAI/EDZRECTIONA RT. PITCH ~L pER~N~L TOTAL; 28 1.25 6.500 2 750 62.26 6,5 ACCIDENTS REPORTED LAST 2& KCXJRS: ~ OF INJURED : ENPLOTER '- SOCIAL SEC. NO. : TIldE OF ACCIOENT: DESCiIIPTIO# OF ACCIDENT; ST&TUS OF INJURED; 7175 7268 7361 7/,53 -rrs~ 7828 7~2D 8013 2~84.36 2527.~ 2569,13 0,361 0.8a2 0,501 671& 1754.82 - 1758,61 6806 27,75 319.10 6187.65 6900 26.95 319,36 6271,1/, 1787.53 - 1786.81 699'$ ?..6./,9 319.5t, 635&.21 1819.31 -1813.99 1.531 316./,5 6517.59 2,676 2.3.60 317.73 6602.00 1908.25 - 189~.35 2688.13 22,16 315.02 6687.68 195/,-&3 - 1918.27 2TE&. 27 1.918 21.05 316.16 6773.22 19~8.62 -19&1.98 2758.14 1.290 2028./,1 -2006.95 2~53.&3 18.56 316.88 - 2026. OZ 28~1 . 28 Z ,022 16.70 316.7"5 7127.12 20&6.73 2.066 14.80 316.57 7215.87 2066.89 -2043.15 12.64, 31/,.58 7306.21 2082.66 -205~.57 292.~. 29 2.377 MGR 26 '96 06:0B~M SHM DRILLIMG MOC P.1/E i ~ATE 03126/96 RPT ~_ FIELD CC~EA CREE~ ~ELL #ANE ~ CREEl F~ Jl ~o ~~ RiG D~TH C~) 8155 C~) ?~5 F~T~ ~ H~R~ 13.50 PRE~NT ~ ~H , ~ ~SIXG O.D. 9.6~ ~ST ~SIKG $X~ DEPTH ZS~ ft. SH~ TEST 13.10 ~G DAYS M L~TZM LIK~ 1 O.D. INTERV~ - ft. Sq TEST PPG DAYS SXN~ ~ Z9 LIN~ 2 O,D. __ INT~VAL - __ ft. SD TFST ~ P~n nAYs ii i i iiii ii i ~BTtIF~ FRm ~ ~ 8151, c~. EVAL~TED ~INGS. DRILLED FR.~_8151~ TO 8155~. C~, ~VAL~T~D ..... i , ii i i i i i i Ill . m I CL ,~00 b ~ X oiL z ~IDS ~ RENTI~IT 15.0 / 15.9 nBTIIFn 1~ fl RAB1TF -9 ~ ...... ~ Wl 5~ ~ ~ ~ TOT S~ 110 PRES~RE ~00 TOT ~ A~ ANN ~L DP ~ DC ]~.5 CRIT 12 HILLZ ~,SgO FLAT ~ ~ ~ ~.~9 0.~5 ~]1 8 I ~ mN JV~ ~.~ BIT ~ESUE DRY: 1022.? ~i BIT HP: ~.~5 BZT HP/(~: ~.~2 ii ii ~ Ill ~';~AR~: :~",;~.~.~ ..... ,;/:,..:, ~.... ,., , , .... ,.,, .... ,..~~.:,,Z~. ~~G': _'.. ........ ~';'~ ~ ~: _:.__ ~: _: ................. '. '.'~,.'..' ........... . ..... ,~.,. ~., 13:00 19:~ 6.50 DBILLED FR~ ~46~ TO 8151~ ~T 5 HRS. ~ DO , ,- _ i ' 19:30 ~0;~ 1,~ CZR_~LAT~ ~TT~ UP Fm ~PLES. --.. E ~3Q ZI:~ 0.50 _P.Q.I~D FR~ 8151' TO 8155'. ~T .5 HRS, E ~D 22~00 23:30 1~0 ~E 10 S~..~H~T TRiP TO ~5~. ~LLED ~ AT ~60~. AND 50K AT .... O TR ~-~IO'~H~ TO ~ S~RAL TZ~E5,) RE~ED, TH~N BRIDGE AT 8136'. ~. UU:~" 1~1 ~."'P~ DRY J~, BL~ O~ .~LY... D CF OOt]O 01~30 1-~1 ~H 10 STDS, ~T .... D TR 01;~ IO~;O0 0,50' giX~ AND ~PFO._~C~O nRY ,1~, n _OZ:O0 ~00 ~.00 ~N, ET, ....... .P ..~.:00 L~]O 0.50 CLEWED SLIPS AND IR~ ~J~HNE~ D ~0 ~ 1.50 ~H ........ O T~ .............. , i i_ _ i iii . i ~ ~ ii ii l ..... i i i ~ _ iii ............... ....... ~,/~,,~:~ ~ ~ ~: ,~,. .. ... .. , . ....... ~,'*~1 ~.,~.~,: .~',,, ,.,%,}., DALLY ~LL ~TS ~ ffi 1942~0 DAILY ~S &~& C~ ~ S~isor: .LHL BIB I MRR 26 '96 06:06R~ 5HM DNILLIM~ rlu~ ...... ' ..... "'',".'":':''", .... :'""'"':"'': ..... ; '': ";' ~11~" II~;]l lll]lllll~lJ'11"'t~ A~.%tI~/u L ill I Ii Illlllllllllllllllll ,,m,',ml',',,' im,,m, ,,, t, ,,,,,,,t,,,,,,,,,,i,,,,,,i,~A~.~,. lIR'. '... '. ':'.~ ........ . ..... ....... ...¥...- ........... -...t'. :... L...~. ~. ~.'... ~ ~.~ .'. ~..~ ........... '..L .' ..'.)'t' ::':~-'",~':::':.~:::.:::'~::~:'~:~'~:": ~':.':'~'::':::'::':::':':':;~?:'~o~':.'::'~':.:"::': ::?:.'~::..': ::':': ': '::": ::'"::': ':?'" ':":':: !'~:'.:'~ :.:~o ~: DATE: ~126~6 ~I~ ~2~ ~T~gT~ ~11~ DATE 0F LAST B~ TEST: ~[~11~ UIND DIRECTLY: ~L~ITY __ - __ ~ D~RE~I~ & HT. - ~ZTE ~ U~ ~VE PERI~ ~ ~L ~. NEAT U~ PITCH HEA~ ~T. BLE~ ~ ~0. HE~1NG DRILL ~R ~ ~L , ~L ~ ~R~EL DATA; ~ 2 ~L NI 1 E~H ~N~ ~ zo ~ TOTAL.; Z8 BH l 3 ~ TRIP ~ tO ~ ~ ~TE~ TA[EN B 8155 ft. ~ ~. 1 ~CP ... &~ ~ ' ,.,20 S~ ~?~'?"~'~' ~ .......... ':'"?"~'~'-'LBHA*;*~R'::~'~'~4'~*~?/ ::??"?*~:~ SRCP ~ ~ 30 SPN -:/T~L.,..DE~!pTI~,,,.,,::..~.;:,:::}::?:~,.~:.:. '.~,,: ~:./~.)~.':,,::.,~?,::~;O."..'.D:,';~x :'~.t;~G~':~.:::'~'~: ~ Ku. 2 ~KCP ~0 ~ ~ SP~ 1 BIT C-1VLkB _B.500 1-00 .... SRCP 5~ e ~ SPN ---~ ~OT~ AKO ,Cl 1.~EG 6,~0 .... ~,~S O~R ~B 6.~ 2.~0 1.19 _ S~LE DEN: ~E PRESS: 1 STABZLtZER 5.93~. .... - ......... ----~ HEAS. UHtLE DRLG. &.3~3 ~.813 36,16 ~C~ TENSI~S (1~0 L~) 1 SZAptLt-ZEB 6.~0 2.~0 ,.3,.63 .... 2 STEEL DRILL ~LLAR 6.500 Z.~O 6~,.2B, , 7. B. -- 27 5" &9.~ H~P .............. 5.000 , ill , , , ~L dOZNT .. ~GL[ OFF~T D]R[CTI~ . . ........ -., - ........ ....... i, i . ~IDENTS RE~TED L~T 2& H~S: ....... N~ OF i~3URED : ~IAL SEC. ~. : .................... TINE OF A~IDE~T: . ' -' ,, , ,~AL BH~L~_~TH: 1~.~ ' DE~IPTI~ OF ~IDENT: N~S ~ ~: 26.0 SER ~0. N~S ~ JARS: ~ $ER NO, 0031 STAIUS OF INJUREO: H~RS ~ DO; 21~.5 H~RS ~ NEVI ~: ~ ........ m'~"~'~"~.~'~''~"~"~m~'''''"'~"~''"~'~'~'~'~:~]~:¢~:~L~?~m~.~.HLp~. .'~.H~. .L.L; . , ~, ,, ,; . :. ..... ... , .,,,: .,,:. . .,.,.,: ,1 , , ,: , ,' ,'' , ' , , , ,, , ' , , i' ' iiiili ' I I I .................................................... /'~ '~,~ ~'~' ',"~r/' 'r'~,,,',,,',,',',~,t,Hk~,~ '~,Y~,~'/: .' ........ ,'.,':,','i'i'v,",':,'v,','v'i"'v'",', ................... ................................................ ' ..... ' ...... ' """"~ '~'J~o .......... ."~:~.~.;.~:;~.:~.:+.~..:~:.;.~.~.~.:~.~.;..."~:.~:..r.:;:.~..~.~.:~.:~:.....~ 4.:~..~.:;.:.~.~..~.:..........~...~..~..:~..~.~.:..~.r...:~.:~.~A~:.:~Z~.~:~B~ ~.': I ' ~ .~.~......~.v.......~:~.;.....~..L..;.~..~.;~.;.:~;.;~;~..~/~:~.;.~..~.;~:;~;~;..~.;~; '; ":" :' NE, A. DEPTH ANGLE DIRECTI~ T~ ~ N/S E/U ~RT. SEC. .D.~ 6~4 27,~ 31B,55 61~.31 1722.47 -1~0.31 2~1 .~9 0.377 ~ 27.~ 31g.10 6187.65 I~.82 ,1~8.61 ?A~ ~ ~.~ ~0.~ ~7~. t~ ~ ~7.~3 1~.8~ ~7, :: 0.~ ~3 26.69 319.56 635&.21 1819,31 -1813.~ ?~.IR 0.5~1 ~1 ~Z. 16 315,02 ~7.M 19~.G3 -191~.27 ~.27 1.918 7~53 Z1.05 ~6. ~6 6~.22 1~.~ -I~1 .~ 2~8.1~ ~.~0 ~ __~19~69 _ ]1~56 ~9~, 1~ 1~1 ,~7 -19~.~ 2~.02 1.120 ~ 18.56 316.~ ~39.65 2028.41 -20~.~ ~53.&3 ~ 16.70 316.~ 7127.32 2~.~ -2026.02 2~1.28 2.02Z ~13 12.~ 314.58 ~.21 2~.~ -2058.57 ~.~ ~ES: .................. ~ , ., - ........ · . DATE 03/Z5/96 SPT ~8 FIELD Ci]IEA_~EE1C gELL .~NE ~)REA C~E~ FEO #1 NO 1 RX8 APE S (,Z7100Q DEEPEST ?AA~T--~YONEK G S71~) PT~O 900._._~D AK.liD. ~ OEPTN (HD) 7908 CT1/1)) ~ FCX~AGE ~:~?., HDURS ~1'3.$.q PRES~IIT ~P: D__RILLI~LG AT 7~n, .. _ , LAST CJLSllIG O.D. 9.675 LAST CASZIIG SHDE DEPTH 2~,3 ft. SIMON TEST ~ PPG DAYS ON LQCATIGN LZNER I O.D. -.-.--- ZIITERVAL ft. SHOE TEST · PPG DAYS SZNCE SI~ 28. LIliES 2 O.D. ZIITERVAL _____ ' __._ ft. SNOE TEST ' PPG PROENOSEO DAYS LINER $ O.D. -- IIITERVAL ' ft. SItOE YEST _____ PPG · EX, CUT IVE SLNIARY: ILLED FI~II 76 ". 7 S'. CBU. p llEg BIT NOTON. RIH. Fl) FRON 7665* · , , IKX) ~'T ]LOT} VtS ~ PV ~ YP &5 GELS ~38 p, 8.2 gL ~ IIPHT ',aL. 17' ~ pf/Nf._.__/ Q~ Cl. ~ Ca 160 ~, OiL __~ SOLIDS 1__5 BEIIT/SAL~ ~5.0 / 15:5 OR~LL~ .1_(~,.~, BARZTE -9.~ ;PN Jl 55 S~ W2 ~ TOT SPN 1~_....~0 PP. ES~URE 2500 TOT ~ ~ ANN V~L DP ~ DC :383.6 CRZT JV: ~[33.& BlT PRESSURE DROP: 1022.~ psi BIT NP: ~ BIT HP/inZ: · i ROTATING STRING biT. 188 BHA gT. Ell IIX); 50 RPN: ~ - 270 ;LAC~ OFF VT. ~57 .OB: Z5 - _~ PICK UP tiT. ~ TQUaUE: ~ ~ :-" . ~.~~':,~;;~.::;:~.~P.E ~ t)/'~ ..... ':: ..... ,~ ........................ o6:00~ ~~ FRm ?SSS, . _l~-.~) ~ 3.o---'fi' L D BIT S ET~ AND LAS. RECOYER~~ ~ __ ~ TEETH tN BOC)T llE~ BIT ILJO ANO #AKE UP B 17~0Q 17;:30 0.50 ~?' ~0 766.~'. ~' ~'0 ?665~_JiAil..?,_~?.T. OF FILL.. ___P__ VA 17:]0 O6.'~.~ DIRECl'Z~C~t 7665' , T 1 .:3 #RS i~1--mBmlm-, ~ d~~ .. i-.-im,---,i-- ~.11-.i-. ~ ii~B,.II~ '~ ',; ,., ,r ,. ,, , ....... , --'--'-- '"-- ~.V;"~-~ -"'-'- ,~....m..,.. ,m,,.,.~4,~,-~ ,,.,,,.,.,,,~ · ..------ ~;,,, .1,',~i~ ,t:., I:i,,~~,;'~;:JOTi DALLY Id'ELL COSTS ~ DATE; 03/25/96 RIG ]220 __ CONTRACTOR DD,,q4TII4E C2J~ DATF OF LAST BOp TFST: ~ IdZND DIRECTIOn: VELOCITY -- - ~ UAVE DZRFCT~OI & HT. I~t~ITE ~ ulmd _ I,IAVE PEIIlO0 ROLL OqT. IIEAT ~ PITCH ' KEAV~ ORTo BLE~D Ulcd BARO. #EAD Z#G __..._. DIIILL UATEII _ Uled ~I)L ___.__ POT IJATER UI, ed ,~ FUEL Ur, ed PER:g:)IINEL DATA: IqOC 1 POX. 1:1 NI 1 EPOCH IACrJ;RtXJIID GAS to TOTAL: 2:6 BH! 2 ILia( CONYE~TION GAS to TItIP GAS 1;o SLOI~ ~ RATES TAI~N g ~ ft. . ,- ,: . ............. ~:~ ...... :........: ....... :.m;:~-..-::-.:.::.,'..:i~:'~ .... ~ ~. ~ S~CP 5~0 g ..~ SPtl .................................. ..,.. .................. ~ NO. 2 Sat:P 520 · ~ SFq4 1 BIT C-I~.i. RG 8..500 1.00 sRcP ~n a ~'--~ sP, 1- HoTOR ~0 :C.1 1-~OEG 6.750 .... 20.9? , -- 1 CROSS OVE~ U 6.?5:3 ;).250 I. 19 SNALE DEN: PONE PRESS: 1 ~T~BTLTZER 5.938 Z.8~$ .... '------- ' 1 #EAS._~rtIZLE DRt. G. 6,3~3 ~.1~13 :36.16 ' " ANCHO~ TENSIONS (1000 tb~) 1 STA~tLIZEn 6.~50 2.750 2 $1EEL DRILL COLLAr" ~TShO 2.750 . ..6.1.28 1. 2. _.__ ~ CROSS pV;R ~B 6.5oo 2,81T 5. 6. 1 H~c''- ~A~S ... 6.250 2.813 32.92 ?. ~_. 8. ' ...... 27 ~" ~9..~# HUOP _5.00n 3.000 i 8ALL JOZ#T .... , AgGLF OFFSET D2RECT~ON · ,i · ..... ACCIDE#Tdt REPORTED LAST 2& KOUR$; ... .' NANE OF ZN,JURED : , " I~PLOTER ~ . ' ' '" SOCt&L SEC. NO. : ......... TINE OF ACCIDFNT: _ ' __'TPTAL 9~t.~ LENGTH; 1090..75. DESCRIPTION OF ACCIDE#T: HOURS ON HOTOR; 1~.5 SER NO. 111 .... HOURS ON JARS: 25.5 ~Eli NO. 0031 ' ' HOURS ON DC: S:TATUS OF INJUIP, ED: HOURS O~ HEVI Id'T: ~ · ~' ....... ,, ~ .;...:..:. ,. ................. . .,,. , .... ,,.: .: '.' :.';:?(' ;:'::":.':' :: .~': :' .: '.'.":!.":'.i: !ii:!;;: ;,::':~.,!~.% ~:.... .................. ~!~.~ ~ i~.!~..!' :.~...!"~;::!; ;~. ~;..:. :.:'L:~:i?:i :~' ~: ?.?.'..,./i":'i::: ?: 6437 2B.50 317.51 5862.ZZ 1625.39 -1642.&3 2310.70 0.394 6529 28. ~9 3~ 7.~6 59~3. ~9 ~,~s?. s9 -~67~. 9s z~.~ m2~ 2a.22 3~a.05 602~.27 ~689.78 -~?0~.~,~ z397.rr &?l& 27.96 318,55 6106.31 1722.47 -1730.31 2441.49 0.37'7 ~ 27'.75 319._10 6157.&:5 175/,.82 -175~,61 Z/,S/, .38.. 0,~6~ 6900 ;~6.95 3~9.38 6271.1~. ~787.53 .1786.e~ 2527.~, 6993 26.~,9 319.5/, 635~.21 1a~9.31 .~8~3.99 L,%9.13 0.501 7081 26.04, 319.7~ 64,.33.13 18,~8.98 - 1839.21 2607.95 0.520 7175 26.03 316.~5 6517.59 1879.68 - 1866.76 26~9.13 1.531 7268 23.6o 3,~ 7._~ 66o2. oo 19o8.25 - 1~.35 ~688.13 7'36'1 22.16 315.02 ~7.68 193~,.&:3 -19'18.27 272&.27 1.9'18 7453 2~ .05 316. ~6 6773.22 1958.62 - ~9/4.98 ~75S. 1~ ~ .2~0 75~ ~9.69 317.56 689~.15 199~.37 -1972.69 2~03.02 1,~0 7736 18.56 3~6.sa 7o39.65 zo2a.~ -2006.95 zss3.~3 o.r~8 ~r~ ,16.70 :S16.75 71~?.3~ ,2~. 8.~ -207,A.o? 2~81.Z0 iIOTES; ,, ..... · , ,, _ ,, , , all i i · la i ii i i DATE 03/24/96 RPT 2? FIELD C]~REA GREEK itELk NAJdE COREA CREEIC FI~O #1 No 1 RIO 1221) _ AFE · 427i000 PEEP£ST TAROT ~ONEK._ a 5700 PTVD 9OOQ' AFE.Im. 66O0695 DEPTH CHD) ?656 (T~) 6~ FOOTAGE 125 HOURS 12.00 PRESEIIT OP: DRII. J,J[#G AT 7656' , iiii .. _ _ . LAST CASZ#6 O.D. 9.67~, LAST CX$1#G Sl~ DEPTH 2563 ft. SliGE TEST 13.1Q. PPG DAYS ON LOCATiON LINER 1 O.D. ZNTF. RVAL __ ' _ ,~ -_ ft. SNI~ TLS? __ PPG DAYS SINCE SM LINER Z O.D. INTERVAL ' ft. SIKiE TEST _ _ P9~ ~OGNO~ DAYS LA#ER 3 O.D. INTERVAL - ,, ft. SI~ TEST .--.- PP6 ii i i i . . .... EXECUTIVE SU~Y' NTLLED ON JUNIC AT.~31'. P~. RECOVERED ONE (;UP OF IRON__lN...er~ BASKETS. HiLL 80~ UOR# AND ~) PATTEIni OF #iLLUiG UP_ _~C~__E. P/U alt ~9 AND Q~l~i- niH. UASM_ED_?~dIS' TO ~531' DRILLED FRON ~Jl' T,O ,7656'. i i il ..... ii ii · _ i i il N~ ~ ViS 65 PV 20 YP t5 G~LS~8 pH_8..3_ ia. ~ HPHTUL 16 Pm 0 Pf/#f~,O.9. Ct ~8000 Ca 1~ X 0~--[ '-~ SOLIDS 15 BENT/SALT 12.5.715.9. DRILLt'--'D .108.--~ BARITE -9.__5 (lb/lit) i SPIC Ill _60 5P# #2 __6Q TOT ~ 129 PRESSURE ~ TOT GPN _5_!5- Alii VEL DP 266.9 DC &~O.~ CRIT t01.,1, 13 ,9 .... 8.500 #P21G P.637'4 13 15 1~ 125 10.00 1~ #IL, I~Z 8.500 FLAT eOT -_:_-~__. " ,,, 3 8.50 0.35 r~il ~ '1 '~ ~tl~,, I ~D TO __11 qlLL1 8.500 IILABED 7.'-.'9. ? 9.00 0.77 7528 .7. 2 URN & dO TO 3V: &23.7 BIT PRESSURE DROP: _16}_1;~ p~i BIT HP: /,96._28. BIT #Plin2: 8.746 i i ....... ii i i i ROTATING STRING VT. 175 ella &lT. IN 14t~: 5_0 ILDN; ~ - 100 SLAOC OFF VT. 160 We; .Ii,' Pi~ LiP VT. ~0 TORlaU[: _ _~00 i i 06:00 0~;00 2.00 NtLl~fl o)~ dUNIC AT ..755,1'. HiLL QUIT TOR_OI_M!tNG. D HI 2 08;-00 D8,130' 0.50 HtXEO AND PIii[~D. DRY _~_r~_. llLOl~ DOWII tft~t,t,T pm) LINES. D ~)T I~_;_3Qi1!_:00 2.50~ ~__H &l/ DRILL PtPE D. ,,. TI 11:0!1~1_3~00 2..00 BHA. L/l) HILL, CLEANED [~Ol BASICF. IS ..... RECOVERED APROXINATELY 1 [lJP QF D BN 2 t.o__r~._. #ZI.L .ur~_ _N i~O~. W.pAA~TERN OF __f3'J~._E 011 BOTTON OF NII, L. CI~ILD 5Iii. _ I~ DJ~TTERN OF 141LLZNG.~LL OF ~. L~/I) 91JI4PEII ~ ANO JARS. 13;00 ~&;~30 1.50 BHA...P/~J BIT W~ ~. TESTEp '~".--M.E. ROVED H.~ VT. JTS AI~tJND, Rill ~IITH D BH !.u~ ....... . ~&t30 17;30 3.00 RZH TO 74~69' ....... l) TI~ 17:30 18:00 0.50 ~.A.!~'~_ FRC~I }'489' TO' 75N1' ' . .. . O ~A , 18:00 0~:00'~12.001 DRILLED FRO# 7'531' TQ 7656~. AQT ~0 #RS .... D DD · ! l., il ill ........ , . l. i . i.! . ,. i . , il .. . Il, ,... ' · I~llml I I · Il I.l Il Il . Il .... III · ,l .. ..... Lkr",i': ......... i' i, .,-,.,: ,'~,,.,,:? ~.. -!,'i ?i ......... . ..... ..... _ ........ ' ~, . , , ~'~ ~,.7 [ i,,) ~ , . . ... ,, · .. ,~,~ L,,,.,..V,..,.~,~ ,;.,.,, ....... .,, i,.~, ........... ,,l . . DAILY UELL COST· 38512 ~ 185692? DAILY #UO$_ 2786 ~ 132125 ¢:LIpel~i$or; LHL ..... i I/I'H DOW 5NIMMIMG dHS W~00:~0 96, SE~W DATE OF L/~T ~ TEST: 03/.21~ DIRECTION; VEL __ - __ I, IAVI Illll?lBll J lIT. __ " ~ITE ~ UI~ ~ ~RI~ ROLL ~T. ~AT ~ PITCH ~ -- ~T. BLEND ~ Ut~ ~0. DRILL ~TER ~ ,_ t=L ~ ' " Hi 1 E~M TRIP ~ t~ ~, ~S '11' .... .. ........... . ~ .. ~ .................... .... ~.:::'.:'....~ :.' ': ::.:..: ............ '...:'..r ........ ...'.~.~gA~E~,, .'~ :I '..'..~' ..... ...'.....,.,,. ~P No. 1 s~ 4~ a ~n ~ . . .,.~ .~..~.,,.,~.~..~ ...... ~cp ~ ~ ~ 5~ ...~¢L..~.tP~.i~.?~%~;~:~:?;::;:.:..~:~:...:~i~?~.~..r?...:..~..:`~.?~p..:~::?..?::.~x.:~.L~TH ..r.~ ~P NO. 2 ~CP 5~ ~ 20 5~ ' 1 BiT HP~IG .. 8.500 SRCP 5~ a ~ ~ 1 JuNK ~SKEY 7.'~b 2,250 ].~ , ,-- 1 HB S~B~LIZER a~ -' ~,500 , i ~LE DbN; ~ ma.; ~ 18~ P~y ~_LAR ~.~ 3.~0. 0.87 -' -- I S~JLIZER 8.~" .,. "" 6.~0 - .- ~c~ tENSOrS (1000 t~) ~ ~EAS. ~LE peLO, ,~.6Z5 Z.2SO,. , ~.~6 .1 ~T~ILIZER 8.5" 6.259 Z.~O . ~.63 1. ~. ~ STEEL .~RZLL'~-LAR 6.~ 2.~0 61.28 __ ~. ,, ~. ~ ~OSS ~ ~g '" 6.500 5. 6 ..... 2 5" &9.~ ~P "S.p~O ~.000 . .... .. , ~ ~8 ~. ~9,3e ~mP _ s.o~ , 3.000 ~.~6,. ~LL JOIB~ ,, ' .... ,, ii ii ~GLE ~FF~FT ~IRFKTI~ ., '"" "' .. , --. .. ACCIDENTS EE~TEb LAST ?A ~S: ....... ~ OF [NJUR~ ~ ...... E~L~EI : , - - ' ' ... ~IAL ~0. PO. ~ ..... " ' Ill DE~IPTI~ OF ~ZDENT: H~S ~ ~T~: SER .... ' ' ' ~RS ~ d~; 2D.~ OER ~. T~ STATUS OF ]N~ED: ~$ ~ H~I ~: .............. .,, ,, .: ........... ::,:: ~: ?.,::, ;' ::..:,.,: ,:, :.,.' :: ;.: ::. :~,.:',:.,. :~ -:, :, h: ':'. '~. :~.,::, .: :..'~.:'L.~; :::':: ~.::'/~?:j ":,.~ :,:, ~:,s::,:?:'~. '~:'::J:"?, ~::L~:: ~': ,.,, ,:,: ,. ,... .:i': ,~?L,.,i,~,y.~'.0..'.0u~¥.:.:....0~,.?w.,,.,~,, ........ ,, ,P' '., ,,,' ~.t.'m:-,-ri0u-,m:,,o?.~lTJ~AL".'A.'l~/ I~~ .... ~ ~.~ 317,07 5~,61 1~V2.~ - 1612.19 Z~. 1~ 0.327 ~ 26.49 ]19.5~ ~.21 1819.31 -1813,~ 2~9.13 ~.~ol --- 71~ ~.~- '" ~16.45 65t7.59 18~.~ -1~.76 2~9.13 1.5~1 ~ ~.~ 317.~ ~.oo I~B.25 -18~.35 2~, 13 2.676 ~I 72.16 315.02 ~7.~ 19~.43 - 1918.27 2~4.27 1.91B 7453 21.Q~ ~16.16 6~.22 1~B.62 -1941.98 Z~.~ ~.~yu ~82 _~9,~9 317.56 ,. ~. 15 _ .1~1.37 - 19~69 2~3 -gg ~- ~ zu _._ ~OTES = M~R ~B '~6 06:~5~M SHP DRILLIM6 MOC t,I~LL NJU~ C~EA CRE]EK FI~ II1 #o ~ RZG ~ ~700 PT~A) ~nn AFE.NOo MOD~O~ DATE ~ RPT 26 FIELD COREA CREEK AFE $ &271000 DEEPEST TARGET TYONEIC DEPT~ CND) ~ CTVO) 6~4~ FOOT&M _~ HOURS PRF. SI~#T OP: NILLING ON_tUNIC AT 7'531' _ t. AST CASING O.D. 9.&7S LAST CASING SHOE DEPTH ~ ft. SHOE TEST 13.1..._._~0 PPG LINE~. 1 O.D. ~ INTERVAL ~ ' ft. SHOE TEST PP~ LXHER :2 O.D. tNT~ItYAL __ ' .----- ft. SNOF. TEST .... PPG LI#ER 3 O.D. ,. ,, t#TERVAL ~ ' ft. SW~ TEST .___.._ PP~ DAYS O. LoC&TZON Z6, DAYS SINC~ SPUD 2~ PROGHOS~D DAYS &O EXECUTIVE SLIqlMRY: I El) FREI4 , TO 7528' OUTT TC~OL~~.~~LL 70~ F IROM IN T BASK:ETS. UP #ILL Itg. ~2S' TO wJ) uT 10.3 VIS 69 PV lQ YP 45 GELS j~//,~ pH 8.;~ ~ & HP#T gL 16 ~m 0 pf/Nf.___/~ CL ~ Ca 1~ X OfL __--~ SOLIDS 1._~5 BENT/SALT lZ.__._~5-~-15,1 DRILLE~D ~09.~ BARITE -9.2 (Lb/kd)L) SPN #1 50 SPIq ~ 50 TOT SP# ~ PRESSURE . 1200 TOT GPI4 ~ AKll VEL DP ;~20-Z DC ,.3&6.9 cRXT ~ att HP/tnZ: _____. Jr: BIT PRESSURE DROP: __.__.. p~i 81T XP: ~ ROTATING b'TRXNG IdT. 17~ BNA UT. IN I~JO: 50 RP#: ~ ' ~ --- ---- ~me: _.~.- 15 SL. AClC oFF gT. 16Q TOROUE: 500 ~ PICK UP gT. 210 ~-- - FROI4 ~ , T 7~28. TOR MOOTHED OU ~$. POOH. ANED OUT ~S~ETS. HAD A._..~PPROX. 1 CUP O~_]~£TAL. NIL HAD 1" GROOVI~ ~_.N tN BOTTOI4 FACEtNG gORH F(~ SIDE OF' NIL SCARRING HILL #2 A~ID_RJ~ PIILL T~'~ - REAPI~D $ LY FRON 7525' FRO# 7500 TO ~ ~ D OH FROg 7528~ _T(iL_75_311. DAILY gELL CosTS . 45358 ~ 18~ DAILY HUOS /.L97 eLMS 1~9337 SLq3ervi6or: LHL DATE: IARITE 363 Used INT. NEAT _ Usecl_- CNT. BLEND . Used DRILL WATER Um~d kilTER ~ used FUEL Used BACr~OtmO GAS ----- to.__Z CON#ECTIC)X GAS to TRIP GAS to ~ SLOe PUPIP RATES TAXEN a 75.____~ ft. PUMP NO. 1 SRCP 39O a Z_~ SPM SRCP /.20 a 3._~0 sP# PUNP NO. 2 SRCP ~ a 2~0 SPN S~CP &To a 3.__~0 SPN SHALE DEN: ----m.-- PORE pRESS: ___._. TENSIONS (1000 Lbo) gALL ,,JOINT ANGLE OFFSEI' O[RECTZON 1220 COXTRACTOR DOU#T%ME CUM,~ ~ZND DZRECT10~: VELOCITY ~ ~ WAVE DIRECIZOH & HT. ROLL ~ PERI~ ... PZTCH ~ HEA~ .. 11.00 hr~ PER~)NNEL DATA: NOC 1 POOL HZ 1 EPOCH TOTAL: 25 7.00~ 2.000 BASKET 7.000 2.250 I ~IT ~ 6.37~. 2.500 6.250 3.010 3.12 3.6~ 2.9~ 1 JRAULIC JAI cRos~ 6.500 2.750 6.500 ACCIDENTS REPO~TED LAS1 NANE OF I~JURF. D : ENPLO~ER : ~OC~AL SEC, NO. ; TZ#E OF ACCIDENT: ._..._ DESCRIPTION OF ACCIDENT; STATUS OF INJURED: TOT/ HOURS ON NC)TOR: IIOURS 01~ JARS: HOURg ON HEV! UT: 17&.7 1025 12 SER NO. ~ L~9,24 316.2r. bOlZ~.l~/ 6251 28.81 316.~ 5699.11 ~.37 6621 671& 68O6 69OO 6993 7081 7175 7268 T~61 2B.80 2R.50 28.22 27.96 27.75 26.95 26.04 26.03 22.16 317.07 317.51 318.05 318.55 319.10 319.38 319.73 31&.~5 317.73 ~15.D2 ,;.; 1527.69 1559.99 57110.61 1592.63 5862.22 1625.39 d~324.27 1689-?R M06,31 17'22o/.? 6187.65 17~.82 6271 · 1/. 1787.53 6~33,13 1848.98 6517.59 1879.68 660:).OO 1908,25 6687,68 193~.&3 - 1581.&9 2221.36 0.479 -1612.19 - 16~2.4,3 -1671 , -1701.18 - 1730.31 -1758.61 -171~6.81 -1839.21 -1866.76 -1895.35 -1918.77 -10&1 2266.15 2.110.70 2/J,, 1 .&9 2527 2607.95 26~9.13 2688.13 272&.27 0.327 0.39~ 0.305 D.377 0.361 0.862 0.520 1.531 2.676 1.918 ALASKA REGION DAILY DRILLING REPORT March 22, 1996 AKR/Kenai Peninsula/Corea Creek Federal #1 Exploration/Operator MARATHON W.I. 100.00% Objective: Drill and Test a 9000' TVD Tyonek Test Dry Hole (Days) Total Cost (Days) Depth (MD) 24-hr Ftg AFE (6600695) $2,896,000 (29) $4,271,000 (40) 7523' 5' Actual $1,773,057 (25) $1,773,057 (25) LAST CSG: 9-5/8" @ 2563 LINER: SHOE TEST: 13.1 MUD WT: 10.4 22 Mar: Tested BOP's. M/U reverse circulating basket and RIH. Milled on cones and cut core from 7518' to 7521' POOH. No recovery. M/U bladed mill and RIH Milled on ~unk from 7519' to 7523'. ' itlllll'l ' ' · i,I , ', i ', I,l,'h'l'lllltl' I' ' ' ' ' I i ,,,, llll,,llhl IIl,llllltll' I IIt,,I',H,I,IIIIIhlIIIIIIII',III' ' , ,I,1.,,', ',,,, ,1.1 ! IIII IIIlll 1' ' ' ,' ,,,l,l,'l,t,l,lll&l llllll'l '1 Il '111 I ' ' ' ' III1'1111'11'11'1'1 ' I' III II illl II I II ' il'l'lill' ' ' [lilllll~llllllllllllllillllll II I '1 I ~ , I 'lil'l ' I Illllll.I i. I I I~1 1', I '1'11'1~1~ ,11 i ' 'i I ' ' ,.: '...~ ;-.;....;:.: ;'.; .~.; .'~' '.,.,,.,,,.;,.,,.,;,.;,. ...... -.:=.:,: .... .: .~:~~~'. ..... ,,,:.,,,,: ,,.,...;..... ' : .....~. ~W~...'.:.:'.' .:....:j . ......: . .~1; ::~: I. :l.... .. .. I .'. .: . ......:.%... ....I.l..I.~..I. . .l · ..........i.. ii '- i , , .... - ...... l/ll ' . iii _ DATE: 0~i~ RIG ~__ ~TR~T~ ~TI~ ~ 11.00 ~ DIR[CTI~ & fiT. __ __ - ~71 Uoed UJU~ u~vtfg~ ROLL ~T. NEAT Us~ PITCH HEA~ .,, ~T. BLEND ~ ~o. ~IKG DRILL ~TER ~ ~L ~L ~ PER~NEL DATA: ~ 1 ~ N! 1 E~H . ~~ ~ ..... tO & TOTAl; 27 ~.t 2 R~ ~E~I~ ~S to TSA 1 _ . , --[ 'n[ , , .: .... , : ',",',',',",'- ,,:,,,W ...... ,;~..,-;;. ~ I.?.;:' ~ ~ ~ ~ ~ ,;_._t~..P~s~r~tl~..:.. .............. . ....... ~ ...... ~ ......... ~ .... ~ .t~ o~ _.. ~ ~. 2 SRCP ~ ~ Z~ 3~ 1, d~K mILL .. g,4~,~ · ~n_ _ ~CP -6~ ; ~ SPH -- 1 JUNK BA~T .. , 7.~ ,.~.~ 3.12 ...... ~ Ju~[ eASKET ~.~0 2.~0 3.~. ~LE DEN: ~ PRESS2 1 _git ~D .... &,T~ 2.599 . ~C~ TENSI~S (1~ L~) I HYD~U~IC J~ 6.~O 2.~0 11.S~ 1 CR~S ~R, ~a 6.000 },QO0 I. 2. ~ STEEL ~R]LL ~LL~' &.500 2.~0 61.~. 3. ' &. ~ ~,s ~R ~B 6.5~ .'..2.813 3.5~ 5. 6. ~ 5" ~9.3~ X~P ,, }r~0 3..~ 925.16 _ 7. ... B.__ . ,. , =, ..... ._ ,,,, ~LL JOINT ..... ~OLE OFF~T DIRE:Ti~ : ~ =, , ,,, , .... ,,, ,. ,, , , . , , ~ , , , ,, , ,, · ., ~C]DENTS RE~T~ LAST 2A N~RS: ..... ~ OF INJ~ED : ........ E~L~ER : ........ ~IAL ~:. ~. : ......... DE~iPTI~ OF A~CIDE~T= X~RS ~ J~S: &.O ~R NO. 'T~ ~ OP ~,}U~rn: ~m~ m nc~ 159.7 ~S ~ HEVI , , ' .- '~. "'L' . -.- -., ...... · :~::~;~;:~?':~.~.~:~::: .~....:.:.....::,... :..:,,,:.~.~::,~:::::::~::::',:::':r~'..', ':. ': .. :':; ::.:, :. ::. ::.'..',:.:..':, ~ .:. ~:~ ~*~,~.-~:.~.q. '.: . ' '.... :. ~ ': : ,: · '. ..... :..:. ::':::...:...: '. ..... : ...: '. '...:.'. . ~ I Il'llllllli'llll'lfI,H'~ll Ilu Ill'il 'l'l'"lif'l ' ' i iIIRUI'I~U~'IAU il[llllll~i IIIIII ' ''" .......................... i--": "il ........ , ,..~....~::.~......:: .... . ,.., . .~ ~. · .. .... .... . . .;, . ............... . ...... - - 6159 ~.Z4 316.~4 ~1B.67 1527.69 - 1550.6Z 2176.~ 0,552 · a;1 ze.el Xl. ~ s~_11 1559.~ -1581.~9 2~1.~ 0.~ ~ ~.~ 5~T.OT ~.61 1592.~ -1412.1e 22~. 4~ n ~77 ~A.%O 317.5~ ~.22 1~5,39 -1~2.G3 ~I0.~ 0.3~ ~ .... ?A lQ 317_46 ..5943.19 165Y.~, -t671.~ ~%.~ .. 6Tla ZT.96 318,55 61M.31 I~,LT -~0.31 2~I .G9 0.3~ ~ 27.~ 319.10. 6187.65 1~.~ -1~.61 2~.~ 0.~1 ~I 36.0q ?~. ~''' ~. I.( 1~.~ - 1~9.21 ~Z.~3 0.~0 ~1 22.16 ~I~:~ ~7., 19,.A3 -1918.27 ~,.27 1.918 ,NOTES: .= . , -. ,, ,,, ,,., :,' , -- ,, , , .., 2/2'd DOW DHIMMI~G dHS WUGE:90 96, 22 H~W CASZ#G a.D. _ .9~675_ LZNER 1 o.D. - LINER 2 O.D. _ LtHER 3 O.D. ~ LAST CASING SH~ DEPTH 256.5 fT. I#TERVAL , _, ft. ZUTERVAL __ ' ~ ft. PRESEIIT CIP: s~ T.T ~__ ppg I S~: TEST ~- PPG 1 SHC21~ TEST _ PPG I DAYS OH LOCATION 2_..~ DAYS SI#CE SPUD ?~_.~ p~OG~]s~ DAYS ~ 14UO MT ~ VIS ~ PV ~ YP A7 GELS ~ &2 pti ~ UL & HPHT M. 1_..~6 pm~O Pr/Mr._._.../O.~ Ct ~ Ca ~ % OIL _.__'-~ S~.tD$ I&__.~E#T/SALT ~..~-~~ DRILLF. D ~ BARITE -5._._..~9 Ctblbbt) SPM #1 ~ siqqf2 ~ TOT SPPl ~ PRESSURE 3..3..3..3..3..3..~ TOT GP14 /,6.._~7 ANN VEL DP 242.~0 DC ~ CRIT ~ ,iV: ~ NIT PRESSURE DROP: ~ 1~i BIT Hi): _3t~d5,.45_ RQTATIIIG STRING ~. ~ n~ ~. IH ~: ~ S~ OFF ~. ~ pt~ ~ ~. ~ BIT Hplir~-: 6.&NB Rim: TC)RGU~: nAZLY UELL COSTS DALLY 14UDS ~ Supervisor: LHL DATE OF L~ST BOP TEST: 03/13/96 BARITE 3~ Used liNT. NEAT Used CHT. BLE#C) Used DRILL I, IATER ~ ~ ~T ~TER ~ U~ BACKGROUND OAS cm#ECTION OAS to _ TRIP GAS to SLOU PIJqP RATES TAKEN a 7&&). ft. PUMP ND. 1 SRCP 630 a ~__~0 SPfl s~cP ~oo ia ~o SRCP ~ a 3__~o PORE PRESS: ______ SHALE DER: ~ ANCROR TENSIONS (1000 Lbo) BALL JOINT RIG 12~O CONTRACTOR DOUgTH~E 1:50 CUH ..11.00 hfs IJIHD DIRECTION: VELVETY ~ ' -- ~ DIRECTI~ & HT, ~ __ ' -- ~ PERI~ ~L .. PITCH HEA~ HE~[NG ~ ~RO .... ~L ~RSONREL DATA: HOC 1 POOL N! 1 EPOCH TOTAL: 27' BHI 2 II&C 6t~ 8.500 AKO ~C1, 1 OVER SUB 1 STJ #EAS. 1 STkBILIZE~ 1 I,,I-_'CH. JAR~_ 6..75O ~ 2.25o 1.19 6.250 5.938 ~7S 1 36.16 ,. 250 S 3.000 ANGLE OFFSET DIRECTION A~CIDENTS REPI~TED LAST 2& HOURS'. NRNE OF INJURED : ENPLOYER : SOCIAL SEC. NO. : tHE OF ACCIDENT: L. DESCRIPTION oF A~CIDENT: STATUS OF I~JL1RED: TOTAL Bj.6_~NGTH: 109 HOLMS ON ~OTOR: 58.2 HOURS ON JARS: 19~ SER NO. 008/+ HOURS ON DC: 15S.~ 63z,4 6/,37 6529 6714 o 6901:) . 6w___._~~ 708~ 7175 7453 I~OTES: 28.80 28.50 28.~.~._~__~ 28.22 27.96 27.75 26.49 ~6.0~ 26.03 23.60 2~.16 21.05 317,07 317.51 318.5S 319.10 ~19.35 319.73 316.&5 317.73 315.02 5780.61 51362.22 6O24.27 6106.31 6187.65 627~.1& 6433.13 6517.59 6602.00 6687.68 1592.63 162~ 1689.78 1722./.7 1754.82 1787.53 1879.68 1908.25 193~./.3 -1612.19 - 1642 .&3 - 1671.95 -1701 .lB -17'50.31 -1758,61 -1786.81 - 1~L~9.21 - 1866.76 -191~.27 - 19~, 1 j98 2266.15 Z310.7B 235/, .3/, 2397.77 2/,41.49 248~.38 2527./~ 2'569.13 ~649.13 268~. 13 272,~.27 0.327 0.39& 0.338 0.305 0.377 0.361 0.862 0.501. 0.520 1.531 2.676 1.918 M~R 20 'D6 07:~B~M SHP DRILLIM~ MOC ~. DATE 03120/96 RPT 23 FIELD i~IEA CREEK k~LL NANE ~EA CREEK FED #1 NO ] RXG AFE S ~ DE~E~ T~T ~Y~E~ __ 8 .~0 PT~ ~00 AFE.NO. DEPT~ Cra) ~ (T~) ~ F~T~ ~ W~ PRESENT ~: DR~ZNG AT ~. ~ ~1~G O.D. , 9~6~ L~T ~NG S~ DEPTH ~ ft. S~ TEST 13.10 ~ ~YS ~ k~T~ LI~ER 1 O.D. INTERV~ ' f~. S~ ~ST ~G DAYS S~H~ S~ , L[~ 2 O.D. __ [N~V~ ~ - _ f~. S~ TEST __ PPG ~S~ DAYS LINER 3 O.D. ZNT~V~ - f~. S~ TEST ~. L~ ~, P~ ~ AND NE~ ~, RIH TO ~H~. REPA[R~ ~CR 5YSTEH. RIH TO ~' RE~ TO ~5'. DRILLED FR~ ~S~ TO ~*. ,, , , ~ m 10.~ VIS ~ ~ 2~ YP &7 ~L5 ~~ ~ 8.,5, ~L ~ NPH~ ~L ~ Pt~Hr / 1.1 Ct 520~ Ca ~ X OiL ,~LIDS ~ ~T/~LT ~~17.] DRiLLE~ 118,7 B~ITE-13.? Ctb/~t) S~ dl 5~ SPN ~ ~ TOT ~ ~ ~ES~RE ,~D~ TOT G~ ~ ANN VEL DP 2~2.0 DC ~1.2 ~IT &19.1 :::~* :.BT~Tf~.:~~?:S~:;~::' :.:?).':~.'TY~'::~'~:.*: ::~:: ~:. SE~TA~.:NO,,?,~] }..~'~:'dET:~}:'. :: ~:~;:~r~: ?:':: K~RS~:::'] _:~.:KT~::_~: ::]OFF:.,~ ~:ZL;._./O~_::O]~ ~ ~':~?~B.:~*~?'~:~,:?g/::~:?'.:~' 9 8 8.500 C-IVLRG ~_~ ~3 _13._1~ 261 :__7.~0 ~6~9 ~_ ~ ._~.500, C*.~VLRG ... B~610 .... 1~ ~3 13 117~ 39.30 _~.~ 7055 [2_ 2~_~A F ? nnCel 8.500 SC-?lZ _0~?~0 ~, ~ 21.50 _~ Z.~_, JV~ ~.~ BIT ~ESUE DR~ 1371.3 ~! BZT HP: _3_~._~ BIT HP/J~: 6.5~ ~ATING STRING ~T, ~ B~ ~, IN ~: ~O R~; 1~ - ~0 ..... s~ OFF W. ~ ~: ~ - ~ PI~ ~ ~. 220 T~E: :"gTCO:: ?E~;'::"~g, :;,~.'~?:,~,', ':?~'::":..:~' ;'H-~;::~.'::'..: ;:"~";,'::'~":.:~.? :.::.?,: ~ERATt,~?;[H;,~E~E.:,.;,: ~,~,: ..*:'. : ~:.:.~'~:,:'::~;::;:~:':?.~, ::,::.::~,'. ~', :.-.:'~.,.;, :,'.~,:~::?~:::":.':, '~.,~',: :.,': ::: ~:~ O7:~0 1.50 ~ UITN DRILL PIPE. D TR 0Tt~ 09z00 1.50 -~ UtTN BHA. LED ~, STABS AND ~NY ~LAR. ~AGE STABS. - .... ~ ~:~ 11;00 Z,~. P/U NEU ~. ~T~. $T~S. TEST ~. RtH UTTH BHA. ~ nH 11:00 11:30 0.50~ RIH TO S~. FILL~_PI~ ANQ OBOE GIRO ........................... P TR .11=~0] 16=00 &.~O', ~T. ~J~ SC~ SYST~. D 16=~118=30 2.50: RtH. O T~ 1~;30. 17~00 O,50 ~E~ F~ 7003" TO ~55~. ~ 19=~ ~=00 11,~ ORILL~ A~ ~R~D F~ 7055" TO ~]6". ~T 7.7 HRS. D ................ ..... .. . ..,. ,. ................................................ , ............ ..... ;,"'"" ,, ~, ....... DATE: 03[20196 RIG 1'~2'D C{)NTRACTOR D~T]HE~.SO ~H 9.50 ~TE ~ ~ST g~ TEST: ~3/13~ ~l~ DIRECTION: VEL~ITY __ . . - _ ~ DIRECTI~ A RT. __ - ~ZTE ~63 ~ ~ PER]~ ~ ~OLL ~T. N~T .... U~ PITCH ? _ K~VE DRILL ~TER Us~ ~L ~T ~T[R Us~ ~L Ug~ PERi,EL DATA: ~ 1 ~L ....... ~ 1 E~H , ~~ ~ ~ to ~ ~TAL: 26 BHI 2 l~ TRZP ~S to SL~ ~P RATES T~N ~ ~ ft. SRCP . 5}5 g 30 ~ 1 ~T~ ArO MC5 1.~EG 6.~0 . _Zl.40 - - ~ , ~ cR~s ~R sub 6.~3 z.25o ' 1.19 S~LE DEW; ~RE PRE~: 1 FL~T ~B '- ' ~,250 -2~0-- , , ,, , , - '1' -STABILIZER' 5.9~ 2.8~ &.91 ~CH~ TENSZ~S ClOOO L~) .... 1 -N[A~t ~ZtE DRLG, - -- -A~3i3 Z.M~ 36.16 1 ~TABZL]ZER ~.250 z.~o 3.63 1. __ 2. ~=:- 2 STEEL DRILL ~_kAfl 6.500 2.~0 .. 61.28 3. ~ ~. 1 CR~S ~ER ~B 6.500 2.813 5. 6. , -2 5. 49.3~ g~P 5.000 3.000 61.70 .,. .... . ......... 27 5" ~9.3~ ~P 5.000 3.000 .... ~L dO~gT ........ .... - .... ...... ~GLE DFF~T DIRECT~ ......... ' ...... ~ : ......... ACCIDENTS RE~TED ~ST 24 ~S: ...... -- -- ~ OF INJ~ED : , ~PL~ER TZ~ OF ACCIDENT: ~ --' TOYAL~UA~ENGTU; 10~2~60 ,,,, ,, ,, i DE~tPTI~ OF ACCIDENT: H~RS ON HOT~: ~9.2 SER ~0. 132 _ .... - H~RS ~ J~S: 7.7 SER NO. ... - ~, ~:~ ~.~ ...... ,...,,,.,~,,~,,, ~.. ,,~,,, ,~,, ,~ ~=ze~=~,,,~s/.; ,,~' ,.,~ ~,.~:..:?,: :/,.:.,: .:. ;.:,,, ; :.,,~;. ~': ,/, ~, :,:/:':'. ?/,,,' ..,.'~'.~ ~, :: :: :,. :,,.'~ ;. '~, ,~'~: .. ....... ........... :...... ........ ~ ~ D]RECT]~-- T~ ~~ VE~T- SEC. ~ ~.~ 315.~ 5537.69 1~.~ - ~518.8~ 2131.02 0.~8 6159 ~.24 316.24 5618.67 15ZT.69 -1550.6Z 2176.~ 0.552 ~51 28.81 316.~ 56~. 11 15S9.~ - 1581.69 2221.~ 0.4~ 6~ ~.80 317.07 5~.61 1592.63 - 1612.19 22~. 15 , 0.~77 ~ 2B.19 317.~ 5943.1~ 1657.59 -1671.95 23~.~ 0.338 ~1 28.22 318.05 ~2~.27 1~.~ - 1701.18 ~97.~ 0.~5 ~71{ 27.96 318.55 61~.31 1~2 .~7 - 1~0.31 24&1.49 0.3~ ~06 Z?.~- 319:10 6187.65 1~6.~ -1~8.61 2~.38 0.361 ~ 26.~ 319.~ ~71. ~ 1787,53 ; 17~.B1 2527.~ ~3 26.&9 319.~ ~54.21 1819.31 -1813.~ ~69.13 0.501 ~1 ~.~ 319.~ ~.13 1~8.98 -1~9.21 2~7.95 0.520 71~ 26.03 316.~5 6517.59 18~.~ - 1~. 76 2~9.13 1.531 ~ __2~6~ . _ 317.~ ~.00 1~.~_ _, ?~893.35 2~.13 2.g76 ~OTES: ...... MAR 19 ~96 O?:~gAM SHP DRIll ~MG MOC P.1/~ i i i · · DATE G3/19/96 APT _ 2~ F~'ELD ~.EAJ~__REEK_ ~,~LL ~ ~ CREEK FED ~1 NO 1 R~G 12~ AFE S- - ~~ OEE~ST T~T TY~E~ g ~ PT~ 9000 AFE.NO. ~ OEPTH (m)- ~5 (~) ~10 ~TAGE Z~ H~S 17.59 PRE,UT m~ ~H .... , . . L~T ~ING O.D. 9.6~ ~ST ~SING SH~ DEPTH 2~ ft. SH~ TE~ ~ PPG DAYS ~ L~TI~ 2~ LINER 1 O.D. tN~AL - ~t. SH~ TEST ~ PK DAYS SZK~ ~ LINER 2 O.D. IHT~VAL -- ft. SH~ TEST PK ~~ DAYS LINER ~ O.D. ~ ZMT~VAL .. ~t. SH~ TE~ , PK ,,. DRZLLED FR~ ~' TO ~7'. ~. ~ ~IPER TRIP TO ~7~~. DRILLED TO ~55'. CTR~LAT~ A~ ,. - ~tTI~EP ~....~. . ...... _ ............ ............ ...... .. , , ,. ,. ~ ~ 10.1 VZS 71 ~ 16 YP &2 ~LS ~ ~ ~ 8.9 ~ 9 HPHT ~ ~ Q Pr/Hr 0.~/ CL 500~ h ~ X Of~ ~~ ~LZDS ~ B~KT/~LT ' 10.0~16.7 DRILLED 1Z~.O ~ITE -~1~9 ~ ~ ~ _~ S~ ~ ~ TOT ~. ~1~ ~S~RE ~5~ TOT G~ 5QZ ~N WL DP ~.1. PC &~.7 ~IT ~1.~ , Q 7 8,5~ C*I~RG B~610 13 13 13 11~ 39.30 29.~ 7055 7 RRCB1 8.5~ ~-ZlZ 011~0 ~ Z~.50 Z.~ 5M5 6.. S _8.5~L~I~RG BJ~_ ]3d3 ]3 5~ 1~.30 31,63 5~>~- 1 1 ~ A e [ NO cP Jv: ~13.1 BIT PRES~E O~ 15~.9 ~i BIT HP: ~50.~ BZT XP/i~: _ ii R~ATIEG ~IING ~. 1~ B~ ~. IN ~: ~ ~: 130 .... - ,1~0, S~ OFF ~. 14~ ~: ~O - ~ ~;~ 14:00 . 8.~ DRILLED ~ .......... T~ . ~T..6.~ _14:~ 115:00 .~.~ .CIR~LATED HOLE CLEAN. _ , 9 CF 15~00 16~00 1.~ g~PER TRIP TO ~&'.(6 STANDS). D TR ~ TO ~UGER TAK~. OTLLUTEO ~ ~N ACT~ SYNTON ANO TREATED DRILLZNG TO L~R ~ZDS. GELS. ~. YP, ~NG ~ FLUZD LOSS. ~_[:~D_ ~:QO ~.5_O,,~_~_~L~_P~_~I~D~. ~PED SLUG, O CF ........ ....... : · . ..... ....... .......... . .. .... . ................ i .... .... '~ 'l Il .... _ _ ,. . . - .......... , DAILY ~LL ~T$ ~0 ~ 1~51 DALLY ~ ~7~ ~ 101126 ~rvisor: ~ i DATE; 03/19/9~ RIG 122D CONTRACTOR DOImfl4TIlqE (:ulq 5.OD hfs DATE OF LAST BOP TEST: ~ ',4tND DIRECTIrm: VELOCITY __ __ MAVE DIREr'TIGN & HT. IIARITE 3~3 Ur, ed _ __ ~VE PERI(X) , ROLL CHT. NEAT ~ - PITCH ~ HEAVE ____ D~T. BLEND Usicl BARO. ., HEADI#G ~ DRILL I~ATER - __ Used VDL POT WATER U~'cl -' FL~L ..... Used PERSON#EL DATA: IqOC 1 PtX)L ' N! 2 EPOCH 4 BAGIC~ GA~ to 58 TOTAL: ~9 BH! 2 RtdC 3 CONNECTION GAS to TRIP GAS To ~ ~. GAS 58 .. SLI:N PUNP RATES TNCE# il 696~ ft. - , ......... _. -... . ~...-...,:B.:.. ..... PUMP #0. 1 ~CP ~ ia ~0 S~ ......... ':'?":':':' ........ 'i:,.:_:::?':=':I~'ffiJI~ER-,'..= .... .,.,.......:.:':~,:'.::!'::,::.~::.?.':~i!!::!:!"?!?:!:.?~'~?: SRCP ~ g ~ $1~1 ~I~Li"OESC~IP.T. IOI;I'~ :.::,i:',.:':::':.:'!:::,,:',:?','i'!'"7?i:oo/,~i!'iiii,:i'X: ::i'!ii:iD :::i?,:'i:'!:i~(".i'.:.:[;ENI~T PU~P #0. 2 S~CP 4?0 @ 20 SP~ 1 ,~ a.500 SRCP 5~d~ Gl 30 SPN - 1 NEAR BIT STABILIZ[R .. 6~500 2.750 4.19 .......... ...~--. _ ~-- - ~ 05" PON~' ~LXR 6.31~ 2.75, q ..... ~? SHALE DEN: PORE PRESS: I STA~ILIZE.~ .... ~.~50 2.750 3.63 ~ 1.. HEAS. U#ILE~_DRLG. ~,625 ;~.;~SO 3&.61 ANCROR TENSIONS (1DOG tb~) 1 STABILIZER 6.5.00 , 2.7~0 ~t63 2- STEEL DRILL COLLAR . 6,500 ;~,750 61.28 1. 2. -- 1 cRosS ~VER sUB 6.50o 2.a/~ 3.53 3. ~ 4. .. ",i.' 2 ~' ~9.~ ~P 5.000 _ 3.0Oo 61.70 5. 6. 1 #ECX ..,.-".~S ...... 6.500 ?.25n ~2.98 ?. ----- ~. -- , _~8 7' ~?.3J Hupp 5.o00 3.000 BALL JOI#T _. .,,. _ ANGLE OFFSET DZRECTI[~i _ __ ........ , , _ ACCIDENTS REPOBTED LAST 24 HOJRS: _ - NAJ4E OF I#JUREO : ...... , E]qPLOYER : SOCIAL SEC. NO. : ' .,, TIHE OF ACCIDENT: ._ "' TOTAL_BH~,LEHGTH~ IOTT.&8 DESCRIPTI[XI OF ACCZDE#T: ' HOURS ON HOTOR: SER NO. HOURS ON JARS: 17/,.5 SER NO. 008~ STATus OF INJURED: " HOURS ON DC: 137._...____~ HOLIES ON HEV! MT: 157......__~0 ~ .... : ............ ~= ....... :..., := ...~?= :.~...~.=...:~....=:..,.. ~..:=~..~ .: ....~:. .. ..: . :.. ... .~.~ ..: . :.. ........... :'.'~G~,'E~:'~,~u,,i.sU"~.S.:":' "i ~..'i ~='.' ~. ~ = i".'. =":':=.. !'.'.i=..'.'ii=..i'ii"~'~i~;':'':''=. ~?".~.'.:.'~..=;'.'/'..i,!? =~iiiiiiiii~=?i/?'', '.'~!,':'~,:?i'.'~ = !,~ii,: '~ .:?.i='~:?i '= .i: '= :i i/',i.- i.i. =. ii'!!'i..i'i;',,', i.i, ! i;.' ,,.. =.,. i ~r I.~i.,.?~.~zfi~rr~s::oo~:.:,' ,' :."=" ,.' .'" ~..",' :~, ,' .:,= = ':. .......... 5757 30.65 316.17 5270.07 1384.02 .1411.:)7 1976.57 O.ZBO 57~g 30.53 :316.36 5297.62 1395.78 -1/,22.53 199Z~5 0.~82 5881 29.93 315.72 5377.11 1429.1Z -1/,5G.68 2039.16 0.?/,0 5974 29.75 315.~ 5/.57.7~ 14~2.2/, - 1/,87.00 2C)85.43 O. 196 6~. -._-_~, 29.66 315.6/, 5537.69 1~9/~.8~ ~ 151lB_.87 ~131.0:2 0.098 6159 29.2/, 316.2¢ 561B.67 ...... 15:~?.69 -1550.67 2176.73 6251 28.81 316.~ 5699.11 1559.99 -lSB1.49 2221.~ 0.~7~ 63/,/, 28.lm 317.07 5780.61 1592.63 -1612.19 2/~.15 0.327 ~37 28.50 317.51 5862.22 1~25.39 -1M2.4~ 2310.70 0.3~ ~529 28.19 317',~6 Se&T, ~9 1657,~9 - 1671.95 235L.3~ 0.3~38 6621 28.22 318.05 602~. 27 1~69.78 - 1701.18 2397.77 0.3o5 67 lt,, 27.96 318.55 6106.31 1722. &7 - 17'50.31 24~,1.49 0.377 6806 27.75 319.10 6187.65 1754.82 - 1758.61 2&!~.38 0.:361 6900 26.95 319.38 6271.14 1'787.53 -1786.81 2527.~, 0.862 '~;%~3 ;~6~. ~.__9 319.5& 6356.21 1819.31 - 181.3..99 Z569,13 O. 501 _ ~3TES: .. ...... ...... '" M~R 18 ~96 07:~0~M SH~ DRILLIM~ MOC P.I~ ~)ATE 03/18/96 RPT ZI FIFLD CT:ZREA CREEK 'd~LL NA.NF CO~EA CREEIC FED ill NO ~ RIG iF[ $ (271.0~ DEEPE~ST TAJ~GET .T. yONEIC g . 5700 PTVD 9000 AFE.NO. DEPTH CI4D) 6660 CTVD) 6GS___~9 FOOTAGE __512 HOURS 21.~Q PRESENT C)P: DRILLING AT ~S~r- · ,. iiii I ii LAST CASING O.D. 9.67~ LAST CASING SHOE DEPTH 2~63 ft. SHOE TEST 13.10 ~ DAYS ON LOCATION 21 LINER 1 O.D. INTERVAL ' ' - ft. SHOE TEST - PPG DAYS SINCE SPUD 21 LINER 2 O.D. INTERVAL -- ' -- ft. SHOE TEST pPG PROGNOSED DAYS &-'-~ LINER ] O.D. ,~ INTERVAL ____ ft. SHOE TEST PPG ' ''' ' i , . EXECUTZVE S~IM~: LLED IRON ~ 646B'. C]~I~R Tl~P TO 5.~~~D TO 6660,. · i ,. ~ ,,.. . , · ~ . 14UO UT 10.~2 VIS ~ PV 19 YP ~& GELS ~ 53 pH ~,A ~ ~ NPNT 1,IL Pm__Q. Pf/Iqf 0.3/ 1.6 Ct &IOOD Ca 20 Y, Of'~' .... '~C SOLIDS I~---~ENT/SALT 10.~0! 13.2 DRILL-'~ 120.~3 GASITE-19.-~--(Lb/bbL): " ., , , .... , m. ., SPt4 #1 58 SPfl ~ ~ TOT SP# 116 PRESSURE ..21~:X3- TOT GPI4 502 ANN VEL DP 260.1 DC ~ CRIT 8 .7 ~JJ610 ~ r~5::,5.00 3100 ~~ 8._~~ eJG~ ~ 579. 'tz~.3~ ~__~.~L58?.5 '1 ~ uT JV: ~_1 nTT PRESSURE DROP: 155~.1 poi BiT HP: 4S5.1~ BIT HP/(n?.: 8.022 · i i i iiiiI i i i al ROTATTNG STRING biT. 162 BHA gT. IN HUO: ~ RPH: 130 - SLACK OFF gT. ~ PlCX: ti, UT. 195 TffimJE., ~,'"'--50 i':.~-Y-kR~: i:t~,!~Ni~::!i! i:fl~'~G: i;;:t:'::! ~ :"" !:.": '!!;i'iii'i;} ~:i !;i,'?'i:::'!?i:i.i:-.]~:!-'.':,!:/:..:..:'~RkT. iC~dg':itil~:::SE'~jE_NCE:.. ;. :: .:' :".'.':' ::::'::i~;:"-'"~'~ir' ::~.:: i.i..i.,:i:~ ..'._. . . : .i: ~i: ::::'.,':: !: :,:':'.'.: i!i,:;4i~. .............. C)6:00' ;~0:3~)[14,.50 DRILLI~D FRC,~ ~.lZS' TO 6~M,. ADT 17.1. ~s. D 20:30 21:30B__I.00 CBU. - .... ~ 23:0~0~~1P TO 5~-i" I --~S. STANI~i & - N ALL PULL~T~'501(. D Tn _._._ _...... EACN SPOT INE$. _ ,1 , i,,., il·U, . - ,, .,. _ , · ..., i , , . .,, , .,. , ..., . ., , ,.i. , j ,., .. · .,. , . ,, .... ., , .., .. ,,·. ...,, ..... . ,, ,., ,..., .,., , , --, ,,~ ,= ,, . . .. ,..,. .. ~ , , , ., ..·, ,, ,, . ,., ..,. '" ' ..... - --~ ..... ' .... " :" ill ,, , ,, .... ,, "'4- ._ , , ·, ~,}:,;,~. :~, ~,,, :1 l,i: ,.,r~:.~ · ' , -,, , i lull .,, DAILY t,~LL CO~T$ 3~699 ~ __1607771 DAILY I~JOS 5390 ClJINS 9/~85~ .... SL~aervisor: PICB i iml i MAR 18 '96 O?:41AM 5M~ DNiLUil~ nus DATE: ~ R%G 1L;r~) CONTRACTOR DOUI~T]FIE___.._ I::UH 5.00 hrs DATE OF L~T ~ TES~: D3/13~ gl~D OIRg~l~: ~L~I~Y ~ ~ - ~ ~ DIREC11~ & HT. ~ZTE 371 ~ ~ PERI~ ~L ~T. ~T ~ PITCH HEA~ ~T. BLEBD ~ ~0. ~ H/~IBG DRILL ~TER U~ ~L ~T ~TER _ . . U~ FUEL ~ PERS~gEL DATA: ~ 1 ~L Mt 2 E~H ~~D ~S tO ~ TOTAL: 2~ BHZ 2 ~ ~BECTI~ ~S to . TRIP ~S to SC~ ~P ~TES T~N g 6597 ~ No. 1 se~ 510 ~ ~ S~ .:.'.'...' ............ .:,.:: .............. -.: SR~ 620 a ~0 ~ ~:.:~:T~L.:OESCRiPT:I.0N.~.;:..::::::~:*.:~.~,:~'.:: :.. :?:~.~'.~:~:~.?.'~X~::'.~::i'!lD'..:.,'~:.:'.~:X ~ ~0. 2 ~CP S~ ~ 2~ ~ ~ n~ 8.5~ 1.00 SRCP ~ g ~ ~ . ..1 ...HEAR BIT STABZL.IZER 6.500 2.~0 1 05~ PONY' ~LAR 6.31~ 2.~0 5.&7 .. S~LE DEN: P~E PRESS: 1 STAGILIZER 6~250 ~ 2~0 ~ 1 HEAS. UH~LE DARK. 6.675 2.~ ~.61 ANCHOR TEBSZOBS C1000 k~) 1 STABILZ~R ............ 6.500_ 2-~ ~ STEEL DRILL. ~LAR ...... 6.500 ........ 2.~0 61,~8 1. ~. ~ 1 CR~S ~R em 6.5~0 2.8~ ~.5~ 3, 4. ~ .... Z 5" ~9.3J g~P 5.OOO 3.000 61.~ S .... 6. 1 H~CH. JARS 6.500 2.250 32.gfl 7 .... 8. ~ 28 5';' Ag.3J H~P ' "5.000 3,GO0 , ,, .......... ~L ~DZNT , ....... . ....... ~GLE OFF~T DIRECTZ~ _ __ i Ill ACCIDEHTS RE~RTED LAST 2G ~St ...... ENPL~ER ~[AL SEC. NO. : TIME OF ACCIDENT: ~ ~ ........ TOTAL BHA LENGTH:' ~07?.~8 '"~ DES~IPTI~ OF ACCIDENT: H~RS ON ~T~: SER ~ ..... -- ' ....... H~RS ON d~S: 162.2 SER ~0. S~ATUS OF IN~UR~: H~RS ~ DC: H~RS ON HEV1 UT: ~ 123,~ .... ....~..,? ~..~..::...?.~ .....: :~ ....... :.: .,,.~ .... . ,,..,. ,. ~..... :. ~...:: :. :: ....:: .~ :.:.. ~ ~..: :...: .?::.,:?~:~,~c~:x~u.::~,~s: ~ ~.' ~: :.~.:t ~.: :': ':' ::':"~:; '.'~" :: :":':: :::.'~:' .'.':"'.~."'~ ;"'::~:.: ~:.~'~?.: .".~ :~.::: :.": ;' :~..':: :::: ~.';~.'~ ~.' ';~,::,':,?::?'Lh~;?~:t:'::', ~.,',: :."%: :;:,,:,, ': ?,~ : :,:',,: ~:'~'~'.':.:...:.'.;:: ~ :'.~'.'.'.~ ~.'.~:~':.": ~' ::.~",;~i'~Ac~'::~zf~N~s~:oa" ,:.:.' :.'.... ..... .'..~ :.:.: ?...: ?' ' .': .... ..:'.' :"..'. "..:',:"" 5~ ~1 .Al ~16.9S 4~S.91 12~5,~ - tA~.?A 1~,38 O, 126 5~ 31.2A 317.37 5030.~ 12~.91 -1312.54 1833.14 0.307 55~ 30.~ 316.59 5111.27 1315 .~2 - 1~5.~ 1~1 .~ 0.505 5~ 30.91 316.18 51~. 17 ~9.~ -13~.31 1¢28.~ 0.2~5 5~7 30.65 316.17 5~.Q7 13~.02 -1411,27 1976.~? '5~ 30,53 316.~ 5297.62 1395.78 - 142~.53 1~2.85 0.482 ~1 ~.93 315.~ 53~.11 1~.12 -14~.~ 2039.16 0.740 597~ ~.~ 315.~ 5457.~ 14~. ~4 - 1487.~ 2~ .43 O. 196 ~ ~.~ 315.~ 5537.69 I&gG.~ - 1518.87 2131.02 O.~& .. 6159 ~.~ 316.~ ~18.6T ~5~7.69 - !5~67 Z176_..~ ~ ~.80 317.07 5~.61 15~.~ - 1612.19 ~. 15 0.3~7 ~37 ~.50 317.51 5~2.22 1~ .39 - 1 ~2.~3 2310.70 0.394 65~ ~. 19 317.~ 59~3.19 1657.59 - 1671 .~ 2354 .~ 0 ~1 ~8,~ ~18.05 ,6p2~.,27 . 1~9.78 ' -1701.18 2397.~ 0.305 ..... ROTES: , , i i il i i i i ii i DATE Q3/17/96 RPT 20 FIELD CGREA CREEK UELL NAJ4E .CC)REA CREEK FED #1 ROI ItlO 122~ .. AFE $ 4271000 DE~J~$T TARGET TYONEK ii 5700 PTVD .__9~_0~ AFE,#O, DEPTH (HO) 6125 (TVD) 5501 FOOTAGE 255 HOURS 15.00 - PRESENT OP: DRILLIUG AT LAST ~A$ING O,D. 9.675 LAST CAGING 5)K2E DEPTH 256~_ ft. SRCE TEST ~ PPG DAYS ON LOCATION 20 LINER I O.D. INTERVAL __ - _ __ ft. SHC~ TEST PPG DAYS SINCE SPLI) LINER 2 O.D ..... INTERVAL - ft. SHOE TEST PPG P~D DAYS LINER :3 O.D. INTERVAL - ft. SHOE TEST PPG ..... E]I~CUT ! VE SL~Yt COI~ED FI~ON 5873' TO 5885'.CBU. PO011. L/l) COI~.IN.G .E..I~IIPI41ENT, RECOVERED /,5' OF CORE. PlflJ DtRECTZOgAL.BHA.. _Rig TO 5_~5'. REAIqED TO 5885', OJl[Lt, Ep FRON 5685~ TO &lIB'. . .... - . . ;. ,. ..-: , , ,l · , .... wJoLrr.lo.~ vis _sa Pv_TT YP 53 GELS_I~/~ P~ ~r3 ~ a,PHTUL Pa 0 CL .49000 Ca .... ~ ~GOi~ _..._ ~, SOLIDS 14 BENT/SALT 7.$'~'16.~5 DRILLE----D 105.-"~ BARITE ~-_11,6 ........... SPN #1 78 SI:)N d/Z f8 TOT ~ 116 PRES~JRE :)700 TOT ~ 50Z ANN VEL DP Z60.1 DC &D9.7 CRIT /~07.0 8 7 8.500 C-IVLRG NJ610 1~ 13 ,~3 .... 2~,3 ..?.,..~ T RRCB1 8.500 SC"'7'12 01177/,0 60 21.5.0 .... ~,.'~rgl __6 6 _a.SQO C-1VLRG BJ633 13 i3 13 579 18.30 31 .~ 5825 1 1 gT A E ,!. _NO CP JV: &13.1 lit PRESSUitE DROP.' 15/,6.5 psi BiT XP: ~4.52.95 BIT liPIln2.* T.982 ROTATING STRING 1,rt. 15._...~ BHA id1'. IN 14UO: _ __6~_ iPtt: 135 - PIL"lC: UP VT. 186 TORQUE; 650 06:00d 11:00 5.OO .CORED FROg 5873, TO 5885~. ACT S _H.RS. p CC 11:001 IZ:O0 .f. O0 _CIRCU~AYED-AND PuHPED SLUG. D CF 12:00, 1L:00 7.00 POON gITH DlaIL~ PIPE. D TR 1/*:00' 16;30 ~.50 PO0~ ~IT~ B~A~ ~/D CO~ AMD L'O~ING EOUtPM~#T. RECOVERED &5' OF 60~ OF ' ,.,D. ,..C~E. ......... !6:~0 18:00 ~..5ol _P~!J_____ANO.RZ# VIT~__DXR~ZONAL_~, 'D eH 18:00 ~'0:00 ~.001 gl# giT# DRILL PIPE TO 58~5~? L__P_ TR 20:OD 1~13:311 0.50 REANED 60' TO BQTTON. D HA _~0:~0 LC~:O0 9..50 DRILL.~D FI~ 58~5~ TO 6126,. ~T ?.8 HRS. b DD , , , ........ · , .., ..... ii · , . ,. ,., . . .... ,,.' ill ,, ,, . , --..... DAILY NELL COSTS ~8918 CUllS 1573022 DAILY HUD$ &&~l? CUXS ~9~62 Supervisor: PKB i i iii MAR 17 '96 08:~7R~ 5MP UNiLLinb r~UU DATE; 03/17/96 RIG 1221) CO~TRAr'TOR I:~t, alrZl4E ~ __ S._O~ hfs BATE o~-LAS! BOP TEST; 0~/13/96 IdltlD DIRECTION; V[LOCITY - ~ gAV~ DIRECTION & HT. - BARITE Ulecl gAgE PERIOD ROLL C~T. II~..M ~ PITCH a~T. ILE#I) Used BARO. HEADINO ... DR! LL UATER ~ VDL POT VATER Lhmd .... FUEL ~ PERSONNEL DATA: HOC 2 KX3L 17' #I 1 EPOCH BALT~D GAS ---- to 88 TOTAL: 28 Bill 3 R&I: C~NECTION GAS tn TRIP GAS 1:o 6 5LOM ~ IL~TES TAKEN ~ 5943 ft. PtJNP KO. 1 SRCP /jZO a _~ sP# ?.~:..i/?~..~...::..~:.:~i;?~::::.!!.?::.~!..;!.;...~:!BHA::.:.k~1~ER:.~!::~ !. :: -11~ ". :. :~;'i: ! { :: .:i !'...i .V:.{ ~. ;: ~cP 5oo ia :3o sPX ~:::TOOL,:i,D£S,t~_fPT'I~: ~' :'~'i?!',?;!'.:i:~!'''';~'''';!~LC~:j'':'-~'i PUMP NO. 2 SRCP &O0 ia -~d SP# .... 1 BIT B.S.,.O0 ...... 1,00 SRCP -SOb ia 3"-~ 5PN - 1 NEAR BZT STABILIZER 6.500 2.?SO , ../,..!9 .... 1. 05!_POfly C~v_~LA_R ..... _6~:31~ Z,750 S.~? SKALE DEN: PORE PRESS: 1 ~:TAglLZZI:'II &.Z4,~O ?.750 3.6:3 .6.5~.__ _2.~_0 5.6~ ANCHOR TENSIONS (~000 Lbs) ~ STABILIZER .. ---2 STEEL DRILL COLLAR 6.500 2.750 61.28 1. 2 ....... - . 1. cross OVER ~J~ ~.~00 z,$TS 3. '-"--- /.. 2 ~".. 49..3~.ltg~p 5~__0~:) ..],00.0 61.70 5. ---- 6, "' 1 WEC~. ~S ~.~00 _2.~. ~.~ ~I~LL .101 #T ...... ANGLE OFFSEt[ DIRECTION ...... .. ACCIDENTS REPORTED LAST 2/, I~$: ........ IIAN£ DF ]NJLI~ED : EMPLOYER SOCIAL ,SEC:. NO. : ...................... TINE OF ACCIDENT: .____ _ _ Ti~TJ~ BHA L~,'TI~: 10~7.&8 ..... DEeaCRIPTION OF AI:C:IDEBT: HOURS ON MOTOR: SER NO. _ ....................... HOURS Oil JAILS: 1/,5.O SER KO. DO64 STAIUS OF INJURED: ~3URS ON DC: 106.0 HOURS ON HEV! t'1: 106.0 ....... · . , , . v ............ , ..... '~: ,, :,,,, ' ..' ".; ....: ,:: ,:".' .' ,:...' v :.:.".':'":tL'i':'::!::"':; :, :;: ,:..v. · :..,'. ".' .,,:, ;' ' .:',".. .~::.,/~.:...,::.:~,;,~,:,. ..... ..:..: :..r.: :,." .... .: .'...:':'. ..... . ..:':': ::': '!::::.:'.':..:.:: ....... .... :. "::. ' · ...... '. :..:::D]RECTTOI~L':'.SURVE~::. .: ......... . ... ..... . .':...:: ;'.'..' '::"' "'!' :"'".".. ' .: '. "... ': ' ":,": ' .!.i:i.i':i!"~:i::... :~.'. :, ,:..:.:::.:.. :.,.... ;: ...::.:.: ..:.:....,. : : : .. . :... ::: ::...::.: .....:, : :: ,, ~ . .. .. . . :..: :.~:~.~,AV:~..~.UT,(,L~,N~O).~ ,:~S:;'~i .' ..! :,:":.':..'...: :.~..': ..:.:. :... ...... .:.,,,,...., .: MEA. DEPTH ANGLE DIR[CTION 1VI~ N/$ ~/u VE,T. SEc-. Oc~a Le~ /d~2B :31. OB 313.78 /*&~. 72 1039.06 - 1082. :36 1500.07 O. 85/, /,920 ~.OS 315.07 /.551.97 1071.76 -1115.7~ 15~6..79 5013 :30.85 315.53 &632.14 1105.26 -1148.88 1593.92 0.896 5106 30.12 317.10 /.71:~.28 1139.37 -1181./,7 16~1.09 1.162. 5~ao ~)-~1 316.68 L793.Z6 117/..~ -lgl&.O9 1(~.79 0.~71 5~03 31 ./.5 317.1/. 4;8a1.~8 1213.16 - 1250.52 17/.2.09 o.57~ 538~ :31 ./,1 316.95 /.953.91 12/.5.60 - 1280.72 1786.M 0.126 5678 31.24 317.37 5030.79 1279.91 -1312.54 1833.14 0.307 5572 :s0.99 :~6.s9 s~.27 ~5~s.~2 -~4s.6a ~s81.6~ 0.505 5757 30.65 316,17 5270.07 138A.02 -1/.11.27 ~97&.57 0.280 s?ea 30.s3 3~6.36 s2~?.62 ~3~s.7a -~.s3 ~992.as saa~ 2~.~ 3~s.72 s3rz,~ s:~.~2 -s~s~.6a 203~.~6 0.7~0 597/, ~9.75 31.5.66 ~,57.78 14~2.2& - lZ, B7. O0 2085.&S O. 196 6t',AA 29.66 315.6~ 5537.69 1&96.8~ -1518.87 2131.02 0.098 )20TES: · . .... ,, ............... . .. _ _ _ i ii . i i i MNH l~a '~ L4F:bWN.~I ~HH D~,ILLI~(~ MO(~ J J ' i ' il .... j ..... i.,~, i'lJl'iJ'" ~'l''l 'l'l''jl~ j'i"l'l"ll'l'j'I' . iii'il ....... ~ ,, ,, , , , , , ...... · ....... I ............................ J '~1 ~lljj~ '~1~ jl~jj .................... .... ...... .... .,,, ,. ..... ~,,, ,, ,,, ..... '., '.'. '. ..... ~',' .-.-':. ;..;...'~,;;..;, . .' .~ ,.~ ,;.. T.,?.t'~T;,T.....T.;'.; ~,' ,,;'-: '~ ::. , ,,~,:, ,,. ~,.,. ,t,,,,J,~,),, J, ,~,~2,~,~1~,,I, ,I th~,'M ' .... ~ ...... L, , Ill I, IIIIIIl&l i I I~1 IIII Ii Illllll I i I I I Il I I - ................. . ...... ":'::t,,t'":'~'~ .... ~' ,~-~ ~, ...... ~,,,,,,,,,,,,,,,,,,,,,, ,.. i . i. ' : .... ":"'':'~'~["~"';"t ...... "...'"'.'" DEPTH (~) 58~ (T~) 5]~ F~TAGE ~ ~S 17.~ PRESENT ~: ~IN~ AT .. , .... , ... i ~ ~SIMG O_D. 0.6~ LA~ ~hsJig SM~ OEPTM T~] ft. SM~ TEST ]~_10 PPG nAY1 ~ I~aTl~ 19 LINER 1 O.D. . INTERVAL ....... ~ ft. SH~ TEST PPG DAYS SIN~ LINER ~ O.D. INTEiVAL __ - -- tR. S~ TEST -- PK V~P DAT5 Ll~ ~ O.D. INTOVAL - ~t. SH~ TE~ PPG .............. ~Tl~ ~Y: L~ DIRECTINAL T~S. P~ ~ING AS~flBLY.__RIH TO_5825~. ~. ~ F~ 5825' TO ........... . , i ~ ~ ~ VIS~ W ~ ~ ~ GELS 15/~ ~ 9.~ K ~NPNT K ~ PflNf 0~/ 1.~ C~ A~ Ca ~0 ~ OiL · ~IOS ~ 8ENTI~LT ?.~ / 15.7 DRZLLE~ 112.5 ~ZTE -~.~ ...... i i ii i 3 3 A.30A CIVt~. hd~7 13 I~ __ 106S ~.0O 6~.S~ S2~ 2 ~. WTA e, 1 MO H~ ,Irt 1IS.5 RIT .FS~mF na~: 119.~ ~t RIT HP; 77.~ RIT HP/i~: __ .............. R~ATINC gtRlNC ~. IS~ g~ ~. I~ ~a RPH, ~9 ' S~ OFF ~. 1~0 ~:00 07:00 t.~ .Oll~. C~ DI~[etlOMkL t~9. ..... 07100 OP~lO . ].lO _iii.,. ~ ~II1[ AItJMJLY ........................ . .... 11~0 l~eO0 1.50 8~EAE CI~CULATI~ AT 5W1~. ~A~NED TO 5825'. C~. .............. ...................... i i .... ..... , .... ............... : .... ~"~'~ j; ........ ?~ ~.':::."~..~., ,~. ;..,. [.~ "~. IlL L ... 'rL. i i ; r.~ ~ L' ~.. . , ~ L~'~c"' ..i ................... ~:~ ~: :,~,~g : ......................... . ~L ~.,,,, ~1 .. . ................... . ..., .... ., - ' 'lb ''~b I~(;:).LHI'I :::)Pti-- UK~LLII'Ib I'IU~- ___ i DATE: 03/16/96 RXG 1220 CONTRACTOR DOUNTIHE CU~ 5.00 hfs DATE OF LAST BOP TEST; ~ UIND D[R£C:TION: VELOCITY ~ - ~ gAVE DIRECTZON L HT. ~ - BARITE Used gAVE PERIOD .-_--- ROLL DiT. NEAT Used PITC# HEAVE INT. BLEND U,~cxJ DARO. __ HEADING DRILL UATER .... Used VDL POT IJATER . Used .............. -- FUEL Used P~SONiI~ D~TA: NOC 2 POOL 17 ' ' #! 1 EPOCH BAClCGROUND GAB to ..... TOTAL: 28 BH! 3 RISC 11 SLOU PUNP BAT£S T~O~# ;1 5~$? ft. ,,, . , ...... , .., .~)~, ~;..~,,,-,g, ?,;,;,; .......... .~ .......... ;,,; ............. ; ........... . ...... I4JHF bl~. I 4,kL¢. & a,'Fi .' ':':",'._'. · :.".. : ......... .:,,: .... ' ..... '.'-'.-': : ': ..... -,'.*:::-'.:: SRCP il ~ ~ ~:`~.:.~.~..~.~`~.~.~.[P.`T.[~...:.~:..!.:.i.~i....~.~.i.~!~:~i~..i.?~..;?~.~;~i.~i.~D PUNP NO. 2 SRCP ~ a ~ ~ .... 1. _C~_.E BIT 8.500 1.25 ~KL:t' .~UU iii 3U ~ / L:UKt: UAKKI:I"' ' ' O./'~U ~.3~ ~ .1 - cross OV~R..Su.B . 6..7~o ,, .:)..8~ $1~ALE DEN: -_-.--- PORE PRESS: ~ 2' STEEL DRILL COLLAR 6.500 2.~50 1 CROSS OVER SUB 6.500 2.61'5 3.5:3 ANCHOR TENSIONS (1000 Lb(i) ~__~" 49,.]# H~K)P .~,0_00 :3,000 61.70 . .1,,#ECH. J~R~ ,6..r~... 1. 2. 28 5,, 40.~# tl;.~Dr, 5.000 3.000 1~3.L~ .. 3. &. 5. 6 7. ,. 8.~ BALL JOINT ................ .. A#GLE OFFSET DIRECTION , ~ ~ , , , ,.,,. . ,, ., ,. , , ,.. ACCiDEHTS REPORTED LAST 2& KOURS.' NAME; OF I#~ ; EHPLOYER : SOCIAL SEC. NO. : .... DESCI~tFTtON OF AC~IDEIIT? HOURB ~M HOTOR. SER gO. ' '"~ ....... HOURS ON JARS: 1:32.Q SER I~C). STATUS OF iNJURED: HOURS C~ Dr_: 9:3.0 HOURS ill/ HEV! VT: .... ~ ..... , ,,,, , , ', ' t~ t ~F) ,t i I~/~il,, ,~11t~'): ~,~;' . , .......... , , , 0.,.,.,,,,,, ,,*,! , ! ' .,,,,,, ......... , ..., .,~ ......... ~ ; .; ' ,., . ................................ , ..... ~ .... ~ ....... ).~ ............................... ': ...... ,, ,. .......................... ;,:,,,,:,; .................. ~,t',i~.~:::A~;ll~_.,~V(,~l?_~ImEtB'*_~:~,.~_ ~ ,. ..,.., , . . , ,. ....... Mr,m,. p[r,l'll AIlC.,L[,, DIRI;OTIOl'I TVP HI9 C/id VERT. gEO. ~',550 ]0.70 314.9] 4232.24 042.31 -0~1.03 1]&O. &/, O. 7~/, ~.. &d4Z Z~. 27 313.7';, 43'11.9:' 9',,'4,. 4~, - 'i u'i 4,. 7¥ 'i4CK;,. (;,1 '1. ~7"J, ¢7Z¢ 20 .-qO 313 .LC £304.0~ ! OOC, ~ ( 0£?, .-r?. I ~.r-, ~. ~3 4828 31.00 313,78 4472,72 1039,06 - 1082.36 1500,07 0.854 ~.~0 30.05 315.07 ¢,551.07 1071 .T& · ~ 115.73 154&. 7~ 1 501.3 30:85 315.53 ~x32.14, 1105.26 - 1148.88 1593.92 0.896 r-iD& 30.qO 317,'10 4,"I~.['0 1139.:37 -1101.47 I~,I.09 5200 30.91 ' 316.6~ /,70J.31 ~ 174.'z2 -131~,.~ 1&tm.70 0.i71 5303 31,4~, 317.14 41101.30 lg13.16 - 1ESO.Sg 1 ?4E:. o~ o .57'J 5__x-t38 31.4,I 31&.95 4,953.¢1 1245.60 - 1280.72 1786.38 0.126 ..... 5/*?8 31.24 317.37 5030.79 1279.91 - 1312.54' 1833.14' 0 .:307 5572 30.99 :316.59 5111.27 1315./,:) -13./,5.68 1881.68 0.50.5 ~ ]0,91 ]16,10 5190.17 1349,68 -1378.31 1928,98 0.245 5757 30.65 316,17 5270,07 1M4,02 -1411,27 1976,57 0,280 57B9 ."{0.53 31~,36 5 L~7.62 1395.7~ - 14ZZ._53 l~r'Z,~_5 o NOTES: .- ........ i , , M~R 15 ~96 07:33~M SHP DRILLIM~ MOC P. 1/2 i i il i i ! i i ii DXTE 0]/15/~ RPT 18 FIELD rOlll~/~ L'REEK .. . ~LL ~E ~EA ~REEE F~I ~o 1 ~IG ~ ~?~lflfl~ ~FF~F~ TI~GFT TYlEr a _i~ nTtm ~ ~[.Ifo. .. , ., , .. ., . . UNER 1 O.D. _ ZNTERVAL _ _ ft. S~ TEST .. . P~ OAYS $ZK~ SU ,. UN~ 2 O.D. SNTE~AL - ft. SH~ TEST P~ P~D DAYS LINER 3 O.D. INT~VAL - ft. S~ TEST PPG . ..,.. ,.. DRILL~ F~ S37&' T~ ~' ~. ~E .]~ TRIP TQ~' ~U. ~, .,,. ,..,.. .. . ,, ... =., , . .. , . .. ,... ,. · Il I II I *11' I -' . ~ ~ VIS ,~ . ~ ~P lJ GELS ~1~ ~ ~ ~L ~ ,P,T ~ ~ 0 Pf/,f 0.~I CL 45~ ~ ~ 2Oit __ · ~ZDS ~ BENT/~LT 5.0~~ DRZLLED 10~'~ B~ITE ~ CLb/~L) . .,,. ,, , ,, ~ 11 ~ ~ ~ ~ T~ ~ 1T~ D~ES~RE 3200 TOT G~ Eli ~i ~L DP ~1.~ OC ~8.7 OfliT ,Z81.I I'.,~"w:'~,gz,~r:,:,, ;'~f~m:,', ,';',~,'~'~t,Y~,:,".'f:',..:'.':~'.'~fi~'~:H~,[.~ ; ~' ~, ..,: ..... ~ r~ ........ ~--~.~.~ -- n'''',,~',,' ~'.< ~ '~ ,',L ...... ~ '~ 6.36b ~twx~ u4~¢ ~ 1J 13_. 190~ ~0.00 ~ ~246 Z ~ ~T A E I NO HR 4 ~ 8.500 ¢-OSR~,R~ B~G93 12 12.12 8~ 9.~ ~.~ 33~1 1 1 N k E t N BNA Jr: ~ BIT PRES~E D~: 1~9~ ~t BIT HP: 626~15 BIT HP/i~: 11.03~ .. .. .,-- , ~.~.ii' -' -- ,';~'~i:i'~8~ r:4,',:: :'i~ .... ' ~ ~ .... ' ........ "'" ~1~$'-9'~ ~-~',~ .". ....... 'r., .,.,,,,~,. ,~, ............................. ,.~..,. ...;,.;;:.~...~=,~:~_ ...... ~,t,~ ~ml~ ,', //.',',',','.', .¥,.', ,~',.', .',',~', .', . ,',?.',', .~ ~ ~ ~~.' ..... ~"!'"'t.'1'.t"",~',~'...'. ...... . .,... ~..~'~ ~*~'~L'~? ~. _~.! ~00 21:~;11.0~ D~ltt~ F~}ll~ lO ~'~ ~T i~,l H~t. . . . ~ OOtlO 01J,]O 1.~ i~[ UIPCfl T~.~P TO~.'.. ~. u 01:~ 02:~0 i.~ CtR~LATED ~E CL~.~ ~PED SLUG.' ......... D CF 0~:30 [QS.3Q ].OO p~ VITH D~ILL,PIPE. 5XANub I~. I~,~U ~ ~LL~' ~UK ~K, -- O '"~'-- ~:30 ~:.~ 0.50 ~H ~iTH B~. · ........... p ,.~. _ _ ,,. , , . ,., . ... . .. ~ i ., . , .1... . ,.., ,. ,. , ..... ,, , ,,... ,, . ,.. ,., ... . ,, ,.., .... ,, . .. .. , .., ,, -- ., , III & , . , ..... .. . , . . .,,, . ., ~ ahb' ',]'~'~'": '" ~. ~:~ ':. ,.. i . , ...... ,... . , . ... _~ ~ ~* ,.,. , . _ _ .......... ,, ,.,:.:..... :..: :..,:~:: . :,~,,.: I I ~ ..... .... .......... I DAf'LY ~ELL COSTS 4I~3~ . C~ 11~57 DA[L~ ~ 8~5 ~S 813g S~i-V;~u,-: P~ I I I III I II MAR 15 '96 OY:~4RN i i .II,..,.IIBM.*, , . , , ,,,. .... , .* · ,,, k.I I,t.,,,*,o.l...,.,,-,-~ , I)&IF; 0~/1~1~ ~IG 'IZZD COI~TRAt'TO~ DI:XMTIHE~ [3J~ ~.OO Ars: DATE OF LAST BOP TEST: 03/13/(~ WIND DIRECTION: VELOCITY __ I~IAVE DIRErTION & liT. - BARITE Used WAVE PERIOD ~ ROLL __ [:liT. NEAT Used .~ PITCH HEAVE C)IT. BLEIID Used BARO. IiEADI#G DRILL ~ATER U~cd VOL IIOT t~Tr:l FUEL I.~ed PERSOIINEL DATA: IIOC 2 PtX)L 17 .... Ill BA~KGiU:tJND GAS to 35 TOTAL: 28 BHI COIINECT ION GAS to TR~P 6A5 to ..~ NAX. G&S ~I. OU PUHP i~TE$ TNCEH ii _SDZ~ ft. P.MP Mn 1 SRCi~ ~ SPll ','~i" :':;,:;'i~'i+:~ ":,'"'i'!": ""::":.:: ~:mll':'iit~r.~:":!:F i~':.! !' ;:'!!-', :': ':~.: :. .h .! :} :: .:. ~. .. , - :...: ..:. . ... : ......,..::.. .... : "~'/it~'~!~t~P~t~' "' ..... ' ........ i~ ....... '~ .... ~li ..... ~"l:l~?/t ....... SRCP ~.$U il 5U ~P~ "*' '::' ' ' ':"':": ',';':: ........ :: .: :":'" ' :: ':': ":"' ' ' '," PU~NO. 2 SRCP~ a ~ sr~ 1 oI1 ~,~.o.o :)Kt, J~ ~l =)fffll I NI:AK Uti ~IAUILI/E:K O.)UU ~.f)U k. IV .... ~ "-' ' "I D~~ POMY C0IL~AR 6.313 2.750 5.4, Z SIIALE DEN: PORE PRESS; 1 $1AIHLIZ[I~ 6.~50 . -- ~ Rt-AS. WHILE DRLG, ~JICHDR lili$lDliS C1000 Lba) l STABILIZER 6.500 2.750 5.63 2 ST_EEL_ DRILL COLLAR .. . 6.500 2.750 61.28 1. 2. , ..... 1 CROSS OVeR SUB 6.500 2.B75 3.53 l, 4. ~ 5" i9.'~# IlUnp ~,O['~) Z,.tX)O .... 61.70 7. 8. ~ ,2~ 5" /,9.3#"NtlOP:___ -___- il , , BALL JOINT ........... ARGLE OFFSET DIRECTION ....... ...... ACCIDEIIT0 llCPOIiTra LAOT 3~. IIOUl~): XAI4E OF IMJURED: ,,, . ..... ENPLO~ER -. ,. SOCIAL SEC, NO. : TINE OF ACCIDENT: , TgT^L BHA LENGTH: 1,p77.4§ DESCRIPTION OF A~CIDENT: HOURS 011 1~3TOR: SER NO, HOURS ON JARS: 115.5 SER NO. 0084 £TATU£ DP ]IIJUPI:D: H(JU~9 (M DC; 76.0 HLJ. M5 UN m-V~ Ul: 76.t~ iii i i iii i ;':"' ,';,' .... ~';,'~ ',,',:',,'~', ,,',,,':;':: ':',,,,,: i; "~" 'i'ii ii ',, L', ,"~ I~ lil~'l~ll [~l'lO)~ ",i'$~.~l/J~Y.~',' ..:,.,'.:,::.:,:, ' . .: .:.::.:.'::'..,.:,:..':.;,:,.,.'.,:,,,., ...... ,.'..'.,,.',.'..'...".",,'.'.',.'? , .,.,,.,.,.,,, ,,..,,.,.. ..... ,.., ............ , ..... ..... ,.,,.,,,,..,,,,,.,.,,,,,,,,,,,,,,,,...,,,,,,,.,,, ................................. ,e ...... , . , . . T, i ql~l~ i. I., i~1 LA pl~ !.11 ~F ,1' ~1~ I~ LU'i~ _ .~1~. ~ ' ' , ......... _ NEA. DEPTH AMGLE DII{~TION TV~ _ N/S E/Id VERT. SEC. _ DOg Leg__ &550 30.7B 31 &. 93 /,232.2/, 9/,2.31 - 981.93 1~. 6/, 0.754 /~) 29.27 313.79 /.311.92 97/,./,6 - 101/,.79 1/,06.61 1.673 &TS~ 30.20 313.65 ~.391.81 1005.99 - 10~7.77 1&52.'75 1.01~ 4d!28 Z1.130 313,78 ~&72.72 1039.06 - 1082.36 1500.07 0.85~ &9'ZO 30.05 31~@7 455:L~7_ 1071.76 -1115.7'5 ......... 154,6.79 1.25~ "'5015 ]0,85 ~15.53 4632.1~ 1105.26 - 11~,B.88 1593.92 0.896 51~ 30.12 317.10 ~712.28 .1139.37 -1181 .~7 1~1.09 1.162 .~03 ~1.&5 317.1/~ 4881.38 1213.16 -1250.5Z 1Z/,Z. O~ 0.5T5 5]1~ ]1 ,/~1 316.~ '~3.91 1Z45.60 - 1280.72 1786.3B O. 126 S/~Zi~ 51.Z& ,317.37 5fl'~11,79 1779,91 -131? "iL 1~ l& il 3A7 ~ 56.~! 516. I~ 5 r;,u, I~' i.,~y, c)43 - 'h.5 (13..~'1 57~T 56.65 516. IT 5276.07 ,~,o,~.u,' -'iq, t.~:/ ',wo.::,/ u./.~u fiTIB In 11 Il& l& ii'lAT. Il ..llII~_T! ,1 f 31 MOTES: , · . i i I = I I l i i DATE 0~/1&/96 RPT 17 FIELD COREA C~EEC HELL NAI4E CORE& CREEK FED i~1 #o 1 RIG AFE $ &Z71000 D~EP~EST TARGET [Y _O~I_EK g 5700 PT'~ .900Q AIrE.NO. DEPTH (14D) 5376 (T~) 49~ FOOTA~ l~& HOURS 7.00 PRESENT OD: DI~I.LLIH§ AT 5376'. . . LAST CASING O.D. _ 9.,6~'5 LAST CASING SHOE DEPTH ~563 ft. SHOE TEST 1~.1D PPG DAYS LINER 1 O.D. INTERVAL ft. SHOE TEST PPG DAYS LZNER 2 O.D. ~ iNTERVAL - fi. SHOE TEST PPG PROGIIO~ED DAYS LINER 3 O.D. " iNTERVAL ft. SHOE TEST .... PPG . . . . EXEi:UT tVS SLI414ARY: ~_ ORILLED FROE 52027_T0 52!,~6'. CBU. POOH, t./T) 140TOR. TESTL~ NOPE. #/U PA~.r~ED_DRILLtNG ASSE#BLY- SHO~. SLIPPED AND CUT DRILL LJkll~.. RI_RTO ~2~t6' CGU. DRILLED FROI4 52&&' TO 53?6; · ,-. -., ,., . . . . , _ . C~ &~O0--~-C~ (?0 ~.Ot--'~' ~-~SOLIDS 1._~Z BENTISALT ..~.5 I__1_/~.~ DRILLED ~.0 BARITE ~._.__~1 .. . · s~¢ #~ ~ sP. #~ s_.~5 TOT SP. t_~O ~.ESSU~E ~3~ TOT C~. &7~ A.. VEL DP ~.-? DC irl'~i/l~l~llii~ll~rl~,~liU,lrl lllf~l~"'l"~t~ ~,,t,[hT,~,l,,,i~.f,,,,~,~,~,~,?ilT~lT~ ~,d ~,~'~lt~,~i~'~r,,' ~il~lllfl't~ & ~ 8.5~ C-05RVk~G I_~_K~ 1~ 1Z 1Z 8~ 9.~ 88.78, ~1.1 1 JrT TQl_T gIT ~F~IOF hO~* 1TGQ q ~i AlT HP' T~ ~ RIT flP/i~: ...... . ROTATING STRING gT. 1~5 I~ ~. tN ~: ~ R~ 110 ..- $~ OFF gT. 12~ ~: ~ - el~ ~ m, ~ T~: ~5~ .......... :~'~T~T: EN~:::::~ ':fi~_~S ' .:'Ti' :: ;:.:; ========================= .;:~;:':;:::;: i: .. ~.~ '~.:':..:~.:. '~.::'.::'::.~ ~R~ ~' :fl_~ 7' SE~N~"~: ~ '.~; :~: T, :::: ,.~"~ ,:~::'~?? :~'~?~:~i]'~:~?~ ~ ::....~.~:!'. ': "~;', 3'~::'~ :'~:::~::'~?~' 08:30 11:30 3.00 '~H WITH DRILL PIPE. O 11230 13:30 2.00 ~H glTHB~ L/D 8iT. HOT~ AND ~TAB ................ D ~e:oo 20:30 2.50 em.. ~/u p~go ~H~.~.~T, TQ_SK~. 2~:30 Z~:O01 O.5O" CtR~JL~TED AND-~DITIONED ~ ..... D ~&:QO ~:001 6.00 ORI~tED Fa~ 5~6' TO 5~76'. AOT 5 ~RS~ ...... ., . , ~ , .......... , , , , .. I Ill .... ........ , , ~ , .... . . ..:, · ... . - .... ...... J , ,. ,,. ~., ~ ~, : " ' ~ , . ............. ~ ..., ~-...,..~. ~,~".~:.,~;.., ~ ~ ~',.~,;~.~.~ ~ ~ ,~ ~.':'.:..~4'~ ....... t. ~-., ,~ ~..,~,',,:,,-,~', Y gfil. I. ~T$ ~ l&~771R I hhllY ~$ ~I~ g2&5, Su~rvisor:. ,, PKg., .... ( I I Ill I I , - ..... : -- .... ,, ~ .,,. ,., ,,,,,, ............... .,...-............,..vv, .. , ,,. ,..., ,.:,v,v,',', · ,~ , , ,.. ' ', ,?, ~i'"" ..... ~.,:'::.;,: :...,:;.~.,,, ~.~ .............. ~ ....... ,,:,..,,~ ...... ?,.~..~..?'~~H~,,.n~T.T,Y,,,~~,..~P. ~,...,.:... .......... :.. ........ ,.,, .......... ,f.~.t.¥...?~ ..~.,~. ~ fi~...~f~;~,,.~,,,,,,,,,?,,~M,.,H~..:~..' -.: ...... :.:..:.~..::?~:.~.:.::..~....~,.~....:.:.~.. ~ ...... ,. , ~., ..i... : - '::. ' ": ;..' .' ':..'::,'.~ ............... ~ ..... .~ ' '.2'.' .... ...................... ~ .............. , ...... ,.,,~.-,.., ~ ~ .,.,,.~..~,, .,~.,,,,, ~~ ~.- ·, .,.., .... - ............................... ~..~0 ........... ~,, DATE: O~/l&~6 RIG 17~ ~TRACT~ ~TI~ DATE OF LAST B~ 1L~1: 03/13/~ gl~ DIRECTLY: ~L~ITY __ ~ __ ~ DIRECTI~ & HT. ~TE Us~ UA~ PERI~ ROLL ~T. NEAT ~ PITCH ~T. BLEND ~ ~0, flE~[NG D~tLL ~TER u~ ~L ~T ~T~fl U~H ,-. ~EL Us~ ~g~NEL DATA: ~ 2 ~L .I 1 E~H ~G~ ~S to 39 TOTAL: 27 BHI 3 ~NECT I~ ~S to TRIP ~ to 6 ~. ~S 39 SLm ~ ~TES TArN g ~ ~ ~. 1 ~CP g ~ , :' '": :~:: '?':'":'~; '~ "~""~:':':: ~;' '"': .... ' ::":'"~:':::~A':~:N~BER''~: :~:~ ~ ::'~"~"~: :;'" ::':(';''':' :: ::~') ~:=~' ~:: :': ~''-- '-~-'': ::: :'-'~ :'~:~:: ) ~-:~ :': :'~' SBF~ 570 a ~ ~ :T~L"DES~,I~TIO~,~:,?,:~:~.::[':~:~:~:::::..:.:::;,-~,~'::,~,,';::;::':,;'x',:L,:,~ l~,:,'~',',:,':':'~:'::'~T~:':''' ~ ~. 2 ~ ~ ~ 1 BIT B.500 ..... 1.00 .... 1 ~' ~NY ~ 6.~I~ Z.~O ~.~Z ~C~ TENSI~S C10~ L~) 1 STAB~R 6.500 Z.~O. 5_~63 2 STEEC~RI~ C~LAR 6.500_ Z.~O ~1.~ ]. '. ~. ' 2 5" ~9.3J H~ .5,0~P ],~ ~1./u 5, 6. ~ 1 ~[CH, 4AR~ 6.5oo 2.~o ___ B~L JOIN1 ........... - -- , , ~OLE OF~GET DI~E~TI~ ..... i ' ' ." ' ... . . , , ICCTDFNT~ gFP~T~ lAST AG H~IRI: ~_ . .. N~E OF INJURED : - - ....... E~L~ER : .... ~AL SEC. NO. ~ ...... TINE OF ACCtDENT~ .... ..... ........... TOTAL DESCR]PTI~ OF ACCIDENT; H~RS ~ ~T~: SER ........... H~RS ~ J~S: 102.2 SER XO. . . STA~ OF ]~J~ED:- H~RS ~ DC; H~RS ~ flEVI ~: 62.5 . _ ~ .......... u J ,~ae ~ ................... ~%TL-;,-.',-,'.-':-]".',?'~-],:',~,''~,,,,,,~:'- - ,, · :~*:*?,.,:,:*?,*' :~:/**:.:.:*~*~*:***~.*.~.;*~:..~..:.::/`..*:~.*:*.:`*'.~*``;`~..`~.`~*:`~*`*::"`~.:`."~."~`'~'"~'~`~&~~i~ii~iiiiiiiii~1iiiiiiiiiii~iT~1~h::.*:::::....:: *,,:,,~;?,:,~ .~*~*.:.:...:~*..:.:*./.*:*.*.**:.:*:*;::**...:*:.*/`:*~**'~'~.'.`*~:'~*~:~*~ i%1 i J , i i ,,, ,,,,, ~,,,,H,~, ,,, , ~ , ,, ,, , , , , .... . .......... ..... ...... .., ..-...-..., .,...-....., . ,..... (ii:~i :ii:~:'::(:(. ::::'h:l ::::::::::::::::::::::::::: ::L:. :.q: :)::~:..~::..:?~.:.:~:.~.h~:.~;~h~ii~ihitih...~..i.~i~jj~U~~.~:~M~.j'.u~.~'~(U~mm~mmmmmmmmm~ui I I ltl ..... ,,,,' .... 3~3 ~9.24 ~1~.~2 ~ .gS T44.~ .~.~ I0~.6~ ~.q~0 ~7 30.28 31~.33 3~3.55 ~.03 -814.33 1 I25,27 1.166 41~ 30.92 313,76 3912.74 8~.59 -~.~ 1 ~.~ &271 29.67 ~15.21 3~Z. 18 ~Z. lO -~. 1 ~ ~363 ~0.3~ 31~.~5 ~071 .~ 876.5~ -913.69 1~.~7 ~57 31,40 314.~ ~152.56 90B.~5 -9~7.9~ 1312,67 ~ 29.27 313.~ ~311.92 97L.~6 -lO1~.79 IG~.6~ G~ SO.20 31S.65 4~91.81 1005.~ - 1~7.~ IGSZ.23 1.01~ ~g 31 .oo 313,~ 4~.~ 1039.06 -10~.36 15~.07 _ 0.854 ~920 ~.05 ' 315.07 4551.97 1071.76 -1113.~ 1546.~ 1.254 5013 ~.85 315.53 4~2.14 1105.26 -11~8.~ 1593.92 0.896 5~ ~.91 316.~ ~3.26 1174.22 - 1214.09 1~.~ 0.871 ~OTES: ~ .......... ...... ..... ..... .... :)ATE 03/13/96 RPT '16 FIELD .C~I. EA CREEIC' __ gELL NAHE ~COREA CREEK: FED 111 Ko 1. RIG 1~1 IFE S ~271000 DEEPEST TARGET .T_YDNE[ g ~ pTVD ~ AFE.NO. ~X]695 _ DEPTH (HD) ~202 CiaO) &7~5 FOOTAGE ?92- HOURS qD.O0 PRES[MT OP: pRILLT#G AT S202ei i ---- , l, i LAST CASING O,D. ~.&75 ~d~ST C~SIMG SHOE DEPTH 2563 ft, SHOE TEST 13,10 PPG DAYS ffi LC)C~TICll __~ LIliEI I O.D. INTERVAL - ------ ft. SHOE TEST . PPG DAYS SI#CE SPt~ LINER 2 O.D. INTERVAL __._ - ft. SHOE TEST PPG PRQGNOSEO DAYS LINER 3 O.D. ~ INTERVAL i - ---~ ft. SIKE TEST PPG _ I II I E~CUTIVE ~Y: RIH TO .~.10,. DalLiED FR~FB ~10' TO &~?', C:BU. p~_~_ 7 sTO SHORT_.TRIP, DaZLLED .FRQN &967' TO 52Cr~'. i ,, HUD ~ lO.O VIS ~9 PV 9 YP _./UI GELS 16/.~ pH 9.0 ~ ._~ #P#T gL __ Pl~ Pf~f..9.~/ O'19 i i i ~: _~9.~ BIT PflES~E DRY: 10~.1 ~ BIT HP: ~.~ BIT HP/i~: ~l~ ,1 ~ATING STRING ~. 1LO B~ ~. IN ~; 50 ~:~ ' ~ , l l~ OFF ~. ~ Tffi~E: .... ~ ~ ~tO~ 11.~ ~LED F~ 1 ' O &~7'. HRS. O CF ~~ 2.00 ~ TO &3~5'. THRmGH T GH ~TS &850'-~ ' ~ ~~:~_~ ILLEO F~ ' 0 520Z'. HRS. ~ DO DALLY ~ELL C~ ~5~ ~ ]~5 ' DAILY ~$ ~8 ~ 6531l~ ; MP~ 1~ ~96 06:~9~M 5HP D~iLLiM~ MOC M.~ DATE: ~ DATE OF LAST BOP TEST: ~ BAg~ZTE , Ur. ed C:H1. BLEND __, - DRILt UATER uud POT I~ATER -- ~ FUEL ~ U~d C~NECTI~# GAS _.__ to TRiP r.d~S to ~ SHALE DEN: PORE PRESS: ANCHOR T~#SIONS (1000 tbs) I~LL JOINT .MJGLE OFFSET DIRECTIOM ACCIDENTS REPORTED LAST 24 HOURS: MANE OF iNJURED : EI, LDLOYER : SOCIAL SEC. NO. : TIFE. OF ACC2DENT: _ DESCRIPTION OF ACCIDENT: STATUS OF I#.PJRED: RIG lZ~ CONTiUU;:TOROOUNTINE.._____CUH UI~ DIRECTION: ~LOCITY ~ ~ ' ..--- UAVE DIRECTI~ & NT .... UAVE~RZ~ . ROLL ___._ PITCH HE~UE .____ HEADING ___._ BARO. ___.- ____.. PERSa3~KEL DATA: le3C 1 POOL HI 1 EPOCH TOTAL: 27 BHI Z I1~ 5.0 17 & 2 TO L B14 LE:NG : I .05 HOURS OM NOTOR; HOURS ON ,,JMtS: HOURS ON DC; HOURS ON HEV! 97.2 SER I~0. .56.5 -- 3808 50./,0 312.67 3592.51 680 .ILl - 711.99 98/, .87 3901 31.12 312.59 3672.&3 713.~ -7~.~ 1032 3~3 ~.2~ 313.~ 3~1 .~ 7~.~ -~.76 10~.~ 4~7 30.28 314.~ ~3.55 ~.03 -814.33 11~.27 4271 315.21 3~. 18 -~1 . 11 1218.~9 ~57 31.~0 31&,~ ~152.56 9~.a5 'gA7-~ 1312,67 &S50 ~.70 31&.~ ~2.2~ 9~2.31 -~81.~ 1~0.~ a~ ~.20 ~13.65 ~391.81 1005.~ -1~7.~ 1452.~ ~8 31.00 313.~ 44~.~ 1039.~ -1~-~ 15~.07 4920 ~.05 315.07 ~551.97 1071.76 - 1115.~ ~-~ 5013 ~.~ 315.53 ~.l& 1105.26 -11~.~ 15~.92 0.753 0.775 2.120 1.168 .574 o."r'~ 1.182 0.754 O.RS4 I .254 0.896 MAR 1P '96 06:46AM SHP DRILLIMG MOC P.I/~ C)ATE 03~ZJ~6 RPT 15 FIELD COREA CREEK ~dELL ~ ~ CREEK F~ ~1,. HO ]~ ~ZG ~ ~ S ~71000 DE~ST T~T ~EK g S~ PT~ ~ AFE.~. ~ DEPTH (~) ~10 (T~) ~1~2 F~T~ ~ ~RS ~ ~E~T ~: ~IKG SH~T TRIP .... ~$T ~$ING O.D. 9r~ ~ ~ING S~ DEPTN ~ ft. S~ TEST 13..10 P~ DAYS ~ L~TI~ LINER 1 O.D. INTERVAL ft. S~ TEST P~ ~YS SIN~ S~ LI~ 2 O.D. ~ IN~RVAL ft. S~ TEST ~ P~ DAYS LIN~ ~ O.D. IN~RVAL - ~ ft. S~ TEST ~ , . EG~I~ ~Y: DRILL~ F~ 3576' TO ~5.~. ~...~A~K.T S~.~T.TRIP. DRILLED FR~ ~55' TO ~10'. ~. ~H TO ~ F~ S~T TRIP' ............... , , , . . .. II I ~ gT 19-1 VIS ~ W 10 YP &~ GELS ~ ~ 9.0 ~ 6 HPHT ~L ~ 0 Pf~f CL _~Q Ca ~ 2 Oi~ ~ ~IDS ~ BENT/~L~~I~-~ DRILLED ~.S BARITE _1~.2 CL~L) SPN ~1 55 ~ ~` _5S TOT S~ ~1~ PRES~E ~ TOT ~H ~ ~N ~L DP 2~.1 PC ~87.7 CRIT S S ~.S~ CI~R~R 6J~7 13 13 13 1~9 l&.~ 76.35 . & ~ 8.500 C-O5R~RG 8K&93 12 12 12 8~ 9.~ ~.~ 3~.1 I~...1 _N A E I N BHA JV: 3~.8 aTT PBES~RE DRY: 1]~.B ~ BIT HP: ~1.~ BIT HP/i~: ~ ........ ~ L _ , i RmATING ~RING VT. 12~ e~ ~. la ~: _5q R~: ~ - ~ ~ OFF ~. 115 ~: ~ ' ]~ ~:~1 11:~' 5.50B DRILLED FR~ ]5?6' TQ ~5', ~T 3,Z H~5, D DC 1t;]0.12;~ 0,50 CtR~T~ H~E C~EAN D Cf _~Z:OO~l~:~ _Z,Og .~H.~. ~_T~ZZS~, ~LEO T~GHT 3550~. A~ ~'-3~Og', P~ TO D 16:00 15:~ 1.00 Riff, RE~ ]3~'-]~'(~T~ ~T). RtH TO ]855' ..... -O Tfl -~52-~ o2:~ 11.0o .DRIL~EP FR~ ~5' TO ~1o~,...~T_7.~ HRS.. _.. p OD O~;OO 0]:~, 1,00 CI~O~AT~ H~E CLEAN, O CF ~P ~;~ 3.0_0. ~Llrn ZO STOS TO S~. ~LL~ TIGHT 4130'. ~O'-~O', ~000,-3~', O ~ TO ~ S~RAL Tt~S. OLD H~E L~E~ ~. (Z HRS TO PULL 6 STO 1 ~ TO ~LL N~T .... ... , , ,, , . ..... . l , ,. ,, ,, , , ,, ............ - ............................ i , ...... ........ · ~ ,. , ,.,. --~.~ ,, ................... ~ ~,,~ ~ "~%-/~ ' h~.~ ,~ ,',?~.'~ ~_~ ~ .......... ~. ............ ......... -- i ....... - ...... ~ ........ ;'.~ ,, ~, ~,~ .... ~,, ', ',~ ,~,','~ ,,' , ,,,il ............. ............ ,~:}~ ~. ~ ~.' .:~.~;.. ~ ~',: ~ ~'. ~ p ......... .- ..... ~LL ~TS . _5~Z _ ~. l~3Z~ DALLY ~S. ~ ~ _~69 S~rvi~or: DALLY MAR 1~ ~96 06:48AM SHP DRiLLiMG ~Uu DATE: 03/12/96 RXG 'l~)'~o COWTI).ACTOR ~TZNF. C3JH S.O0 DATE oF-[J~T BOP TEST: 03/07/~6 WIND DIRECTIOn: VELOCITY _ __ ' ~ - UAVE DIRECTION · HT. ' BARITE 371 Us~l WAVE PERIO0 ROLL I:I~T. #EAT U~ed PITCH HEAVE C]4T. BLEND U~ed BJU[O. HEAD I rig DRILL UATER Used VOL POT ~TER Ur~d FI,~L Ue~l -pERSOII#EL DATA: IdiOt 1 POOL 17 .... N! 2 EPOCH BAC~ GAS to .31 TOTAL: ;)8 liHZ 2 ~ CONNECTION GAS to TRIP GAS to ? NAX. GAS 31 S;LOU PUNP RATES TAICEN ~) :3/,50 fl:. - ............ .... "'-'5'" :': ""-:"' :'' sizr'p ~ a 3O SPH PUNP NO. 2 SRCP &oa a ~ SP~ 1 ~l~ I;-lVLRGR 8.500., 5RCP /,too a 30 ~ 1 HOTOR AJCQ IdC'L. ~.2DEG 6.750 21.40 ~ , ,,, ---,_---_1_ Cm~SS OVER Sm ..... 6.~ ~.~0 SHALE DEBt PORE PRESS: ...... ~ ~L,(~AT SUB 6.250 2,.?50 ~ .. 1 STABILIZER 5.9:38 2.1Sf5 ,.~..9! 6.625 Z.250 ~.6~ ANCHOR TENSIONS (1000 [be) 1 #EAS. UHILE DELG. ,, 1 'S~AB-ILIZER ,, ,6..50,0 2,750 5.6:3 1. 2. .2 STEEL DRILL COCLAR 6.500 2.'/50 61.,2&,. _ 3. - ....... &. "' ,...1 _CROSS OVER ~Ul~ &.500 2.813 ~.5.3 5, '"--- 6. - ..... 3 5H 49.3# HI~)P 5,~IGO .~.oCX:) 92.55 ~-- 1 HEcH. JARS ..... 6.25_0 Z.~O ~2.98 7. 8. _ .......... ~_? ~" /,9.~ HUOP " 5.000 ~.000 83.27,61 ..... BALL JOINT .......... ANGLE OFFSET DIRECTION ..... - - -- ., .- ,, ill ........... . . . . ACC]DENTS REPORTED LAST 2& I~XJRS: ,, ~ OT INJURED ; ......... EKPLOYER ; SOCIAL SEC. NO. : TIHE OF ACCIDENT: -" ' ......... TOTAL BH~ LE#_GI[H; DESCRIPTION OF ACCIDENT; HOURS ON HOTOR: 21.5 S~R NO. 1:32 HOURS ON JARS: 7'7,=? SEll NO. 008~ HOURS OH Dr.: 36.5 STATUS OF INJURED: HOURS ON HEVI IdT; ~ ............ . ..... . ...... ~ *. *~,......,, .. ,: ~ . .. ~;.;.;,.:...,.,, .....;;: .. ~.;: . .: ..,:,,o,',..,'...:.',:.'.,' . ·..~.: ..: ....... ~,: :.,: '?: :..: ~... :.: :.,,.:...'::"..:".!"*.~:: .':!.'.~:,:'::':.':.'."?.':.:: :*~*:,'~::DIREC, T~O~AL:'.'~St~,YEY "i': :' : ' ~': ', ': ' .'. i': ,:: ' i: :': ': :': :":.'"..": i .' :":' .:'i *i ' '.' .'. :', ~!' ,.i:':i:~il :'~ !.:!i.!".i i.i:: i'* ~i ;'::'! ".iii: '. '.i'i"*i' .:':".:~!!'*i'~'"i!'iii.i'~:.'i: ii".i i': !':i,!!' i!':.*:~ ji~,~'t:':i~,A2'f~PL~P)~'' '~15'::~)o: ,' ~/, "';: :.:': '" :"' '." "'.:':,.: NEA. OEPTH ANGLE DIR£CTTON -TVD . Id/S, [1~ VENT. SEC. Dog LL'~J 3065 26,61 -- 313,15'~ - Z93~. 11 /,~,5.09 -/,62. :~?' 6~1.60 0,505 3157 25.59 312.09 3016.80 ¢72 .&0 -&91.9~ 681.89 1.024 3251 25.35 312.18 :5101 . 67' 499.52 - 521.9Z 722.27 0.259 33/,6 25.26 312.03 3185.74 526.17 -551 ./,1 761.97 0.119 34,37 27.76, 2, l&. &0 3268.96 554.61 - 5131 . 63, .~0~.. 4,5 2. gl R 3531 28.62 31/,.7'5 3351.131 585.?'8 -613.26 8/,7.85 0.9.32 3623 29.77 315.35 3432.12 617.5/, -644.96 892.73 1.290 3715 29.70 312.71 3512.01 64,9.25 - 677'. 76 938.3/, 1 .&25 3808 30.40 312.67 3592.51 680.83 -711.99 984 .BT 0.753 3901 31.17 312.59 3672.~3 7'13.0~ -74.6,99 I03~&0 0.7'T5 399~ 29.24 313.62 ' 3751.95 744.63 -780.76 1078.62 2.120 /,087 :3D. 28 31&. 33 3833.55 777.03 -814.33 1125.27 1.168 4179 30.92 313.76 3912.7& R09.59 -ISa.8.00 117'2.09 0.764, 4271 29.67 315.21 399~. 18 8/,;~. 10 -881.11 1218.49 1.574 4,363 30.30 31/*.55 ~,071 ..86 .... 874.5~ -_9~1_3_, 69 126/../.7 0. TT~._ ,,, ,.,, ,.. ....... -- _- --, i i i DATE 03/11/96 IIPT 14 FIELD I~:I~EJ~ CXEi~K T.N~LL JL4H~ ~ ~K F~ ~1. No ~~ RIG 12~ . AF[ $ 42~ DE~EST T~T ~Y~E~ 8 5~0 PT~ ~ AFE.NO. DEPTH (~) _~76 (~) 3~ F~A~ AZ0 ~RS 8.50 ~ESENT ~--DR~L~LING AT 3576' L~T ~SING O.D. 9.6~ ~ST ~SING SH~ DEPTH 25~ fO. SH~ TEST 1].1. 0 P~ DAYS M L~TI~ Li~ 1 O.D. ZNTE~AL ~ ~ - ft. SH~ TE~ PPG DAYS SIN~ ~ L]~ Z O.D. INTE~AL ~ - ft. SH~ TEST PPG PR~ DAYS LINER 3 O.D. INTE~AL - ft. SHM TEST PPG i _OKZLL~.FR~ ~1~e TO ~1' ~2R~LATKDy ~. H~ T~ ~P ~T 15 3~5 TQ G~T ~0 SH~. ~Z[~ A~ ~ ~RY _~ ..... ~. M~ ~ ~T~ AND BIT. RtH TO ~OO0', UA~HED Z~' TO 3341'. DRIL~ FR~ 3~41' TO .... _ .. .......... ~ ~ .9~6 VIS 5~ ~ 1~ YP ~ ~LS ~~ ~ 9.~ WL ~ HPHT ~__ h~ Pf/Hf~ __ CL 41000 Ca ~ ~ OIL X ~L~DS ~ KNT/~LT __ /. 1~.9 D~ZLLED ~.~ ~RJTE -1~.5 ,,. . ,... S~ gl 55 ~ ~ __55 TOT ~ 1~ P~ES~E ~3~ TOT ~ &~ ANN ~L DP ~46.1 DC ,.,~87,7 CR]T ~ ',~.ex:f..~.i ~;_~ z,~::~ L,.~::. ~'~T,Y~e.~:,~:;~, :~?..',. '.~SERtAL~. .: ,0:~:~ ~:': ~d E~.C'.~'~ · ),:.: L,.FGE~,:'.' ,.:: ~.e.:~'. ~ ~:;',:.~" ~:~ ,'~-~FF~:.:~ 5 5 Q~O0, CI~R~ eJ~7 :13 13 13 ~35 3.00 & & 8.5~ C-OSRVLR~ ~9~ ..... 12 12 1~ 8~ 9.~ ~.78 33&1 1 1 N A E I N BHA 3 3 ,12.~0 C-I~RG 9H~ 15 15 15 JV: 3~.8 git PRES~E DRY: _1~.6 ~i BIT HP: 3~.93 BIT HP/i~: 6.~ ........... ROTATING STRING ~T. ~ B~ ~. IN ~: __50 ~t 70 - ~ ,, ~ OFF ~. 11~ ~: ~ - 3~ Pl~ ~ ~. 1~ T~: , ~O0,~:SO ]~0 ORt~tED FR~.~156' TG,.~I'. ~T Z.8 HRS. (HOLD ANGLE DRAPED ~0 O 10:~ 1~:30 5.50 P~. ~.LED.,~E STA~. ~KED NEXT SINGLE ~T AND L/D SAHE. HAD TO D T~,, ~ ~T NEXT 1~ ~ TO Z6007. P~H TO CASING SHOE {2G-&OK DRAG} 15t~ 16tO0 0.50 CIR~ATEO AND ~HKQ.~R7 .JOB. ~ 16:00 18:00 Z<O0 ~N D TR , ..., .18:00 19:~ 1.50 B~. L/D ~ STAB. ~. P/U ~ ~ ~N~ .NEY BiT. D 19:30 Z1:30~ ~.00 C~.~O SH~. FiLL PIN AK TESTED ~. , .,.O. TR 21:]0 Z&:~ ~_C _~SBED FR~ Z~~ TO ~1,. . ...... Q 2~:_00 012~1 1.OOI DRILLED FR~ 33&1' TO ]~'. ADT ,5 9RS.. 0 01:00 OZ':~l 1:00; ~EPAIRED GEOL~RAPH LZNE~EPL~ ~ABLE AND'~LLEY ~N DERRICK} D 01tO0 06:~1 ~,00 DRILLED FR~ ~59' .TO 3576~ ADT ~.5 HRS. ,~,, ..,,... ..... ,..,.--., . ................ ........... ............... - ._.,, . m , .. ... , , .- ~ .... L ................... ii, ,' ,. :~.2~,__.- · , ....... ~ '~:~. ~, , 'f~,,.,,,,i/~., ,~,., ~'~ ....... ,,--, ..,., - -;- -: ,, . · . ,, ..,. ~:~,~ ..... ,~,,,~ .,,/,' ;: ;:~: ~.. ~,L"~r~,,,,,~.~:,,.:,~:~.r:' ~, ,' ;~' ~":~ ~ ",.',,'"'~ :~,~Y ~ ::~,~,~;.'~.~: ~J, ~ ~':"~::"" ~ ' ..... :' ,,... ~,., .~.. ,,,:~ .... , ,, , ., . ,, DATE.* DB/ll/~. R.~C 12r'~O CONTRACTOR DO~I,J~ITIME CL~ ~.~ DATE DF LAST ~OP TEST: 0~/07/~ UZ~ D~RECTI~: ~L~TY - ~ DIRECT]~ & HT. - ~]TE ~71 Us~ ~ PERI~ ROLL ~T. ~EAT ~ PITCH HEA~ DR]LL ~TER Us~ ~L _ ~T ~TER Us~ ... ~L ~ PER~NEL DATA~ ~ 1 ~ ,,, N] 1 EP~H ~~ ~ ~ to ~ TOTAL: 27 OH] 2 ~ 2 ~NECTI~ ~S to _ ~. ~s SL~UTEST~ a ~0 ft. '- '., ." , .-~.'rT'-;; -'. ., ' ~" ~..~:, ~ .... :,~,' ;:.~*;;:::.~ .'.,..., ~' .... ~P ~. I SRCP __ 380 a ~ ~ ' ................ .::'...:: _. _' :'B~'~BE . ...::~.5':.: ::* ....... L",~. ,'.":'.:.": ..... '.:.?. ';':~: '.'..:'..*':..."-. ~ ~. 2 SRCP &~ ~ ~ SPN 1 BIT C-I~RGq 8.500 1~ -.. __ ~ CROSS O~e ~B ,6...~] ~-~ S~LE DEN: ~ ~E ~E~; ~ 1 FL~T ~B ... 6.25~ ~,~0 1.~ ...... ~ STAB~LZZER ~.~ 2~a~ ~.¢~ ,., ~CH~ TENSZMS ~10~ tM) 1 ~AS. VH]LE ORLG._ 6.6~ . 2.~0 ~.61 1. 2. _ _ 2 STEEL ~]LL ~LAR 6.500 ~,~ 61.28 5. 6. 3 5. ~9.~ ~p . 5.~0 3.000 9g~55, Z. 8. ~ ~ ..1 MECH. JARS 6,250 2.~ BALL JOINT ..... , , ,, ~GLE OFFSET DIRECTI~ ~ . ....... , .. , ,, ~C~DENTS RE~TED LAST 2~ ,., . _ , . ~ OF INJURED : ., EMPLOYER : .... . ~[AL SEC. NO. : · . _ , , , , TI~ OF ACCIDENT: ......... TOTAL B~A ~ENGTH: ~..~ DES~PTI~ OF ACCIDENT: N~RS ~ ~T~: 5.0 SEA NO. i, ,, _ . . ~ _ _ N~S ~ JARS: ~.7 SEA NO. H~RS ~ HEV] UT: ZO.O · %:'":::':' :: :'~ ':?'~' ;'," '~'.:,":~, ~; ~':~':"~."".':~::':':'9 ":::~ :'::::::.:?'::'.,/..~::::::,~ ::' . :: :: ,,: ,...: :ti N~c,~.aZ:[~ (.plANNED)' ~,::,.; ~ ~;"~':~ '.':.,L: j','" ,:: :'::,f~':?,:.,::i~:,,::;: .. ~,~'.' ~' :~:,. ~* ~',~'~: ,:~? ,,:::¥: ':,:-:. ~,::. ' ~A. DEPTH ~GLE O]eEgT~ T~ N/S ... E/~ VE~T. SEC. 2&16 26.96 313.~ 2358.~ ~7,00 -2~.~ ~1,69 O. ~ 27.22 313.fll 2~1.~3 2~.33 -276,~ 3~,03 0,~0 _ ~ .... 28.61 ~1~.20 Z~.~.61 ~.58 '~.~_. ~27.~T' ,_ 1.50r 26~ 28.32 316.27 2~5.37 327.50 -339.8~ 471 .~ 0.314 2~7 27.~ 313. ~ 2~. 61 357.46 -370. ~ 515. ~ O. ~ ZT. 41 31& .~ 2769. OT ~7,32 -~01 . 87 558. ~ 0 .~&8 ~ 26.81 313.~ Z850.96 416.~5 -~32,02 5~,~ 0.~5 ~ 26.6~ 3,~3.~5 ~.~a ~5,~ , -~62.~7 ~ 0.505 ,, 3157 25.59 312.09 ~016.~ 4~.,0 -491 .~ ~1.89 1 .~4 3251 ~,35 312.18 3101.6? ~.52 -521.92 722.27 0,~9 3~ ~ .26 31Z. 03 3185,74 526.17 -551.61 761.9r O. 1 ~3? 27,76 314,40 ~2~.96 556.61 -581.~ ~,45 2.918 3531 ~.~2 31~,~ 3351. ~1 585. ~ -61~. ~6 ~7. B5 0.9~2 rNOTES: ' ' " , , - . ..... ,,,, . DON D~IqqI~d dHS N~£~:90 96, II ~UN M~R 10 ~D6 06:48~M SHP DRILLIM~ MOC P.1/2 BATE 03/10/96 RPT 13 FIELD COREA CRKKI~ k~LL NAXE (;ORI~A CREEI~ FED ~1 NO 1 RIG 12~ RFE S ~ D~E~ T~T TYVEK i S~O PT~ ~O AFE.NO. DEPTH (~) 3156 (~) 3916 F~TA~ 3~ ~ 5.~ PREENT ~: DRILLING AT 31%' L~T ~SING O.D. 9.6~ ~ ~SING S~ DEPTH ~ ft. SG TEST 13.10 ~G DAYS ~ L~TI~ ._ L~NEB 1 O.D. IN~RVAL - ft. SG TEST ~G DAYS S~N~ LINER 2 O,D, INTERVAL - ft. S~ TEST ~G PR~D OAYS LZNER 3 O,O, ~NTERVAL - ft, SG TEST ~G ...... EXE~ZW ~Yt Nt~D ~ 6~ BBLS ~LYHER ~ AND SPA~R PilLS. DZSPLA~D ~ UtTH PILLS AND ~LYHER ~. DRfLLED FR~ ~1~' TO }156'~ , C~ ~ ~ ~ ~OiL .. ~LIDS ~ BEHT/~LT / ~2.1 D~tLLED 6.2 ~ITE ~2.0 (L~L) ~ 81 _~0 ~ S2__ 50 TOT S~ _IOQ ~ES~E ~050 TOT G~ ~ ANN VEL DP 2ZO.~ DC ~ ~ 8.5~1 C-~RVLRG 8~9} 12 12 12 69& 7,10 97.7~ 3 3 12.2501 C-l~RG BH~ 15 15 15 ~ ~ 1Z.ZSO C-05~RG BJ ~ 15 15 15 ~258 ~,70 65,07 25~/1 1 UT A F & ~TD JV: ~10.4 ItT PRE~ OR~: ~ ~i ItT HP: ~ BiT HP/i~: 6,~ ' ....... - ~ATING STRING m. ~ BM m. ~N ~: ~ ~: ~ PZ~ ~ ~. 1~ T~: &O0 ':~5~R~:d ::::'E~.~.: ~ ~6~ i~?~.:.::¥::, :'.: :'::::;:::'~· ~';:>:A.:~:~.:~::.~' :::~.::,::,;.:~:::":.~E~T~.:f ~;~.~NCE::: :':~.:.~:.":..:: ~'::~.:'~;::~' :':~.:.:::~'::::'::.'~::;~: '~':::.~::~'::',:¥:::~.:' :: :':~.:~:~':~':;'.:~: :;:Y .R~THER.~ BB~S FL~ PRO ~. tN_ ACTt~.SYSTEH .... Mt,XED_IZ~.BLS F~LO~VJ_S ' ~ IGHTEO ~ACER,_ kNO 30 _BB~F__uN~ GHTED~ SPA~e. _ ZZ:~ GO1:00 3;00 .-btspCACEO ~_TO ~GER PiT ~ITH__UN~tGH~EO_ PI_L~ ,__FLO VIS PZLL, THEN D CF FL~ PRO ~. CZR~LATED FL~ PRO NUO AR~NDt 01t~ ~toO 5.00 DRILLED FR~ 2818' TO 3156~. ~T 3,5 H~RS. O OD ii i IIll ............ ...... .: "~1 .... - ........... ..... ~ ..... ..~.: ~ ~..~, : . ,. ...... ............... ...... ...... ~ ,ii ~. ~.~ . .. ... . ,, ., , . , , ,., ~ ...... ~ , ,],' * DASLY ~LL ~TS __ ~I~ ~ 12~1Z~ DAILY ~S 2~ ~ ~ S~sor: LHL ... MP~ 10 ~6 06:~M SHP DRILL1M~ MU~ DATE; ~)3/.10/_9~_ RZG ]~.2D CONTRACTO~ DOMNTZHE CuH 5~0 hfs DATE OF LAST B~ TEST~ 0~/07~ UI~ DIRECTION: ~LOCITY - ~ITE 371 ~ ~ PERI~ ~OLL ~T. NEAT Us~ PITCH HEA~ ~. BLE~ ~ ~0. HE~ING DE[LL ~TER ~ ~L ~T ~TER ~ ....... F~L ~ PER~NEL DATA~ ~ 1 P~ ,, H~ 1 E~H ~C~D ~S I ~o ~ TOTAL: 30 BH~ 2 RgK ~E~I~ ~ to TRIP ~S to $L~ ~P ~TES T~ R ~ ft. ~cr " ~o a ~ ~ ~,T~?.o~pT~t-~~ ~.~.~,'~.~.:::~:~.,.': ' '...?m ~:~::~,~,.~x...::",~'m....'.... ~ NO. 2 ~CP,. ~0 a ~ ~ _~ _ 1 BIT C-~R~G p.500 1.00 SR~ ~ g 3~ ~ ~ NEAR BIT STABILIZER 6.5~ ~.19 . , 1 05' ~Y ~LLAR .... 6.313 2..~ 5~LE DEN: P~E ~ESS: _ ~ STABiLITER ~r,253 ?.~3 3.63 ,.. ' ,- _ _ 1 HEAS. NHILE D~LG. . ,6.675 2.~0 .34-61 ~C~ TENSI~S (1~0 l~) 1 ~TABILIZER 6.~0~ .... 2.~0 Z .STEEL DRILL C~A~ '_ 6.500 2.~0 61.~., 1. . 2 ..... _ 1 CROSS ~ER S~ ,., 6.500 ~.~I~_. 3. __ 4, __ 3 5-,, 4~.3~ ~v .... 5.ooo 3.~. 9~.5s 5. 6. I ,MECH. JARS... 6,Z~O. 2.250 7, B. 2~ 5" ~9.3J H~.. _ 5,000 3.000 ~LL dol MT .., ,.. ,.,.. , U~E OFF~T DI~ECTI~ , .,=,.,,, ,,,, , ,,,.. .., i,, = , . ..... ~IDENTS RE~T~ LAST 2~ ,.. ~ OF INJ~ : .,. ..,. ENPL~ER ,. ,.,, .... ~]AL SEC. ~, ; .......... ' ' ' . ' " . TmAL~HA LSNGT'H': i0~,~8. DE~IPTI~ DF ACCIDENT: H~RS ~ JARS: 52.2 SER NO. STATUS OF INJURED: H~S ~ DC: 11.5 H~S ~ HEVI ~: 11~5 ~ :'. ?' ,: ~:,, :'..:.,.,:/.~ ::'~.?,.:.',. ~:.:,'.. ~..: ?. :, :::. :,: .:'~ .: .:., :., ,' '.':,.: ~t ~i~:~z ~(~X",g~),~." ~ S::.~ ~ .., .. :,.~,.,' ,. ' .':' ,.',', '. ;', ,, ~.,. ,.. :"..:. ~. '::'.':: ".': ~EA. DEPTH ~GLE Di~ECTI~ ~ N/S E/~ VERT. ~[C ..... ~o~ Leg 16~ 1~.~ 316.'~ I~Z.~ S1 .&l -55.2~' ~.~9 1 ~67 1S.81 ~1S.3~ 1~7.9~ ~.6S -71.8~ ~.~ 1~3 19.~ 314.37 1~5.&0 107.93 - 111.43 155.1Z 1.765 ~ Z1 .~ 31Z.87 Z0~.74 1~.~ -1~.~ 187.0Z 2.200 ~139 23.~ 316.03 21~. 7~ ~ .~ - ~.22 Z~ .39 2.85~ ~1 26.22 316,~i 219~ 1~.43 - 1~.B9 259.~4 0.~0 ~ 2~.02 313.00 22~.~ ~07.~ -215.57 ~.50 3.1~ 2~16 26.~ 313.85 2358.~ 237.~ -~6.23 ~1.69 0.420 25~ 27.~ 313.81 2~ 1 .~3 2~.33 -276. ~ ~. 03 0 Z~2 za.61 ~1~.20 z5~.61 ~.5~ -3~..~ ~?,~. 1.507 ~95 z8.3~ 31~.27 2605.37 3~Z. SO -339.85 ~71 .a9 ~.3~4 Z~7 27.~ 313.62 2~.61 357.~6 -3~.94 515.~ 0.~ ~ 27.41 316.34 z~69.07 3BT.3Z -401 .f17 55~.~ 0.4~8 ~ Z6.81 313.~ 2850.96 416.45 -432.02 5~.96 0.~5 ~5 ~.~1 _ }~3,15 ~3~. 11 445~ 09 -~6~.27 ~1 ,~.. 0.505 NOTES: ,, r ..... i ,i, ........ ........ i i i iii i . ,mi Ul . i :)ATE Q3/l~a/96 RPT 12 FIELD COREA_CREEIC _. UELL N~NE ~OnEA CRgE~ FED #_~ No ~ RIG .~.2;2~ I~FE · /.271000 DE[PEST TARGET TYONEK -- a ~ PTVD ?QO0 AFE.NO. 6600695 DEPTR (FID) ~ (TVD) ~ FOOTAGE ~33 itChY'&.50 PRESENT O~: #IXlNC~ pOLYMER ~4UO LAST CASING O.D. 9.675 LAST CASING SHOE DEPTH LINER 1 O.D. INTERVAL LINER 2 O.D. INTERVAL - __~__ft. LINER 3 O.D. --~ INTERVAL - ___._ft. SHC~ TEST 1].10 PPG SHOE TEST PPG SIIC~ TEST ~ PPG SHOE TEST ~ PPG DAYS ON LC)CATtgl 12 DAYS SINCE SPUD 12 pRQGKOSED DAYS !XECUTIVE SUHHART; gAS FROH ' TO 24 ' TAG NENT. RCULAT TESTED lNG TO PSt. LLED C T FL ' I_AR F T SHOE 58 OF NATION 908- LATED. TESTED $ TO 13 PPG EH RILLED 25 ' TO 2818' CBU. HAD PLMPOUT ST 6 JO TS. RIH 2818'. BU. P TO 2530' P~PED~ SPLIO FRIll ACT PITS. AgED PIT START O NIXING Y#ER HUD. _- MUD VT _.9.T vls &z PV 1~I C% 900 Ca 120 ~ Oil yp ~ GELS ._~/ 1Z pH 10.7 UL ~ HP#T UL ~ Pm ?. Pr/Hr 1_<~/ ~.,p X SOLIDS 10 BENT/S~LT ~ / ~.1, DRILLED ~ BARITE .. 3.9 (Lb/bbt) . JV: ~5.9 ~PN#Z ~ TOT SPN 1QZ, PRESSURE _~lOq TOT GPI4 ~1 ANN VEL DP ~ DC ~ CRIT 2&I.? 98.88 5 · ._ _ 65 ? 2585 1 tit F 4 TD git PRESSURE DROP: 1571.0 pBi lit HP~ ~ BIT HP/~n?.: ?.1~J ~ .... -- _ ROTATING STRING UT. l__O.O.O.O.O.O.O~L BHAgT. tn WJ02 _5_Q RP#: 80_9._ - 100 SLACK OFFgT. IOQ ~og: 25 - 30 pIC[UP~T. 11~5 TO~QUE: 5O0 ,~ TO 2590~ ADT 1.2 I~OLE CLEA~ I.&PPG HUD 13.1 PP MIJ. R O OLIEtL. CASING HRS. 6 CF CF OD 2530' THROUGH ANO STAR MIXING OM PRO . OT DALLY t/ELL COSTS __ ~15 ~/T 'd DALLY NUD$. LUllS. ~Olg8 supervisor: L_~L .... t DOrA ~NI~-I-I~JC[ dHS NU01;':90 96, 60 ~llJl, J DATE: DATE OF LAST BOP T£ST: CONNECTION GAS to ,, TRIP GAS to ~ $1IALE DEN: ._.___.. PORE PRESS: ___.__ AMCHOR TEMSSONS C1000 Lk~) BALL JOINT ANGLE OFFSET DIRECTION RIG 1220 COI~TRACTOR DOUgTIHE_____ CLM t/IV DIRECTtO#: ~L~tTY ~ . ~ ~ PERZ~ ROLL ~ pITCH ~ HEA~ ~ ~ 5.O_Q hre PERSONNEL DATA: ~ 1 ~ #I 1 EPOCH TOTAL: 30 B#! 2 RLIC ~ STA 1 HEAS .,.. 6.253~ 2.75.5 6.62S 2 .L~50 :S& .61 1 MEC ,~.3# Hm_r__ 6.500 2.813 3.53 6.2S0. 2 3.000 ACCtOENTS REPORTEO LAST 24 HOURS: MANE OF INJURED : EMPLOYER : SOCIAL SEC. NO. : TINE OF ACCIDENT: ~ TOTAL DESCRIPTION OF ACCIDENT: STATUS OF I~JU~ED= HOURS ON HOTOR: SER NO. HOURS ON DC: 6.S HOURS ON HEVT UT: 6.S 1397 6.60 316.07 1396.31 15.Z4 -17.44 1/89 9,76 314,17 1487.36 24.48 -26.70 1581 12.88 311.31 1577.56 36.69 -&O.O0 1673 13.75 316.69 1667.09 51.41 -55.20 1767 -111.&3 1953 19.0& 314 1935.&0 107.93 20&6 21.06 312.67 202Z.T& 129.93 -134.5& 2139 23.68 31&.03 2108.74 154.29 -160,22 2231 2&.22 314.61 2192.~. 180.&3 -186,B9 2416 26.96 313.85 2356.64 237.00 2509 27.22 313.81 2441.43 266.33 -276.78 2602 28.61 314.20 2523,61 796.56 -308.09 2695 Z8.32 314.27 2605.37 327.50 -339.85 23.11. 2.147 36.19 56.23 3.~45 75.39 1.6~5 155.12 1.765 167.02 2.200 222.39 2.8.57 259.7~ 0.680 299.51 3~1.69 O.AZO 38/..~ 0.280 ~27.57 1.507 471.89 0.31~ NOTES: 2/~"cl DOIA 9klI"i-II~d clHS klU2~t,:90 96, 60 ~IUP, I M~R 08 '96 06:18~M SHP DR !~IM~ MOC ~' P 1~ OX/~8/96 IJ~T 1~ F;E~ ~EA CREEK ~LL ~E ~A ~EE~ F~ ~1 ~o 1 RIG 1~ -- $ A271~ ~ST T~T TT~E~-' ~ 5~0 PT~ ~00 ~FE.NO. ~~ _-- ~ING O.D. ?r6~ LAST ~SZNG SG DEPTH ~ ft. 5HM TEST PK DAYS ~ ~TT~ 1~ LS~R 1 O.D. iNT~AL ~ - - ft. SH~ TE~ ' ~ DAYS S2N~ S~ 1~ LINER 2 O.O. ~ tNTE~AL ___ - ~ ft. S~ TEST ~ PK PR~ ~YS ~0 LINER 3 O.D. tNTERVAL --- ' '' ft. SG TEST .... PPG , - SIJI~UtY: ,HA R%H ~ AND LINES, BOP' FRCI4 DERR! - STARTED biT. ~IAS 22~' "--'"'"''" 141JI) TaT Ct 8O..__JO Ca -~0 2 OiL __..'-~ SOLIDS _~O_~ENTISALT 27~'~' 0.1 DRILLED 60.6. BARITE &.O (Lb/I~L Jl SPII ilI .__.._ TOT SPI4 ..... PRESSURE ._.__._ TOT GPM ,_...,_. ANN ~L DP ____._ DC __..__ CRIT 263.8 15 15 15 git PRESSURE DROP: BIT iff): QT A BIT sP/in2: ROTATZNG STRI#GWT. SLAClC OFF WT. PtCXUP ~T. BNA VT. Ill IlJO: ~ RPM: TORQLi: FITTINGS CHOKE LINE PANIC Ltl LINES RAHS TO W TO SET b/EAR ~ITN 12 STD i DERIIICI~. SANE. MM). R! N TO THRCIUGH BRI AT 228.T~ TO ~. BO PT os DALLY UELL COSTS~ CUI4S DAILY 11~05 495. cLJHS ~9981, Supervisor: ~HL DATE: 03?0B/96 RIG 12~) CONTRACTC~ DOtdgTIHE~ ~TE OF ~ST ~ TEST~ ~ ~ DZRECTION: VEL~i~Y __ ~ ' __ ~ DIRECT~ & HT. ~ ~]TE ~ Us~ gA~ PER1~ ~ ROLL ~T. ~EAT U~ P[T~H HEA~ ~T. BLE~ Us~ ~O. ~ HE~[NG . D~ILL ~TER U~ .. ~T ~TER U~ ~ ' ~L U~' ~NEL DATA: ~ 1 ~C~ ~S to~ TOTAL: 27 BHI Z D~ELL 2 ~ECTZ~ ~s TRIP ~S __ to ,, ,. . SL~ ~ ~ATES TA[EH ~ ft. ' "' ,.'..':::BH~:'.~ER ..... '_:': .... : .... :':'-~'.~:- .... . ............... ~ ,, I 05' ~V ~LA" 6.3~ ~.~, 5..47 ., ,, S~ALE DEN: , ~E P~5S: ~ sT~1LI~ER 6.~53 Z.~3 3-~ ~ 1 ~EAS. U~ZLE ONLY, "6,6~ Z,~O ~.6~ .... 1 STABILIZER 6.50g 2.~ 5.~ ~C~ TENSI~S (:1000 t~) 2 STEEL bRIL'~ CQLLAR ' ' 6.5~ 2.~ ,, , ~LL JOIN1 , ' ., ~GLE DFF~T blRECT[~ , , ' ,,, ., .. , , , ,, ACCIDENTS RE~TED LAST 2& H~S: , " ~ OF INJU~EO : - _ EHPL~ER ~ .... ~iAL SEC. K. : , ,,, ,,. TIHE OF ~CZDENT: " ~TAL Bq~ LKNGT~ ~0~.,~0 DE~IPTION OF ACCZDENT: H~RS ~ ~T~: SER ~0. -- H~RS ~ DC: STATUS OF ZN3UR~: ~S ~ HEVI ~: .... ~ ,. . , , , ,, ,, . ..... ..,,, ,, : ~.*, ,, , : :, ..... . .... ' ..... *,""' ................ '*:'~tO'g~Y l'~(' ~V~:~",'? "' '~'' ~'~*":'*'?"*':'~';*:~'"','~"'/~ '~ ": '~"?'*.~v','.*~,'..~ .... ?,""*'.*;,:,~, : ".',' "' ',.~,~ /. , ,..: .... ~": ~. , ~, .:':'.'. '.." ~. '.. . :. : '. ,'.'. ', . . , . '... , ~ '~-~q w~,---- ' ...... -, .' ~ '~,' ", .' . ~ ~ . ' .... ~"' * , ' .~ , ' ',' ' '" * : ', · ~...~..,:~.~:~::~..~:':~.~,:..:~ ~:~/~,,'.':: ..~::.: ~.:.:,':.,.,'~,:'.~.~ ~r ~.: .... '.,,~~~s:~*' :'. ","," ' *~* :~ E ' 1118 0,53 297.~ 1117.97 2.62 -5.~ 5,9~ 0.035 1211 2,44 320,03 1210.94 4.~ -7.~3 8.32 2,1~ 1~ ~.61 317.~ 1 ~3.76 8.~ -11,21 1~ .03 2.~8 1397 6.60 316.07 13~ ,31 15.2~ - 17.44 ~. 11 2.147 1~ 9.76 314,!7 1~87.36 2¢t~ -~6.~ ~.~9 _3r~7 _ 1581 ' 12.~ 311,31 1577.S6 ~".69 -~0.00 S4.23 3,~5 16~ 13.~ 316.69 1~7.09 51.41 -55.20 ~.39 1 .~5 1767 15.81 315.32 1 ~7.97 ~.6S -7~ .87 ~.~ Z.~3 1953 19.08 316~3T 1935.~0 10?.93 - 111.~3 155.1~ 1.765 2~6 21.06 3~Z,87 2022.74 129,93 ..1~.~ 18~.~2 _~.200 _- 2139 23,~ 31~.0S 21~,7~' 15~,29 -1~.2Z ~.39 2.857 ~1 24.22 314 ,gl 2192.82 1~,~3 - 1~.89 259,7~ 0,~0 ~ 27.02 313. O0 22~ .~ 207.~ -21S .57 ~.SO 3.160 2~!6 26.96 31~.85 235~.~ 237.00 -2¢6,23 ~1.69 0.420 .Z~09 Z7.22 3~.B~. 2¢~1,~3 ~.. ~.33 . -276.~ _3~.03 0.~80 NOTES: ~T N 9 5 8" SING APPROX TELY 350 BLS OF TT~NGS APPR~XI~ATE~ CUTTINGS~FTE~ ~ 9 5 8' SING. APPROX :~ER C T .G 1~ ~ . CASING 17 1 2 , VOLU.E 7 BBLS 1 1 ," .OL 20 BBL T.EDRET,~ MAR 07 '96 06:58AM SHP D~~'' LIMG MOC P.1/2 DATE 03/07/.~. RPT 10 FIELD COREA CREEK I,,'ELL NA~E COREA CREEl( FED ~1 HO 1 RIG ~ AFE S ~Z~O OEE~ST ~.E~ ~K a 570q P~ 9000 AFE.NO. DEPTH (~) ~ (~) ~ F~T~E H~S PRE~NT ~: ~q ~S _ . L~T ~SIBG O.D. 9.6~ LAST ~IN6 SH~ DEPTH ~ ft, S~ TEST P~ DAYS ~ L~TI~ LINER 1 O,O, -- INTERV~ ........ ft. S~ TE~ _ ~ DAYS StN~ S~ LINER 2 O.D. iNTErVAL _ ft- S~ TEST PPG PR~ED DAYS LINE~ ~ O.D. __ [NTEEVAL f~, S~ TEST ~TI~ ~Y: FINISH MID OI~RTER~_Y~EH. P~_DI~RTER, SET SL]~. HAOE R~GH ~T. N/D Dt~RTER. HADE FINA~ ~T. ~$ZUG S~ ~D TEST~ ~E. N~ l~,.,, , ............ ., .. .... , ,. ~ UT 9.~ VZS ~ PV ~ YP ~ GELS ~ pH ~ UL ~ HPHT VL~ ~ Pr/Hr 0.~/ CL ~Q C~ 120 X OiL _ _ · ~IDS 1~ BENT/~LT 27.5 / 0.1 ORZLLED ~0.6 B~ITE ~.O (t~[) . .,,, S~ fl ~ ~2 TOT SPN P~ES~E TOT G~ ~N VEL DP DC CRIT ._ : ~N~ :;:~TT~/:.! ~ S f ~_:~ ~:~,;~.~p~;~.~:,:Z.): :'~ I'AL :NO, ~..:. :.~. ~JET'(32; t).~:,;,; :FEE T*:> ~::~ S.~*~. F.~-FT'~HR~: ~', ~::~-~ F ::~; ~*~ >, :'~6 ~: ~.~ .~ ::~'::~*.:'~'~ ~: ;*~:;G: .: :~S~: :*~:~ ....... JV= _ ,. BiT PR[S~E DRY: ~ ~i BIT HP: BIT ,. . ROTATinG STRING ~. BHA ~. ~N ~: RPN: ' S~ OFF ~. ~: - PS~ ~ ~, T~E: ~ ,,, , ~OO 12:oo 6.~ ,~ DI~n~ER SYSTEM. P/U D~VERTER ~,D SET SLIPS M~Q.E R~G~_~T. O MLLED blVERTER. lZ~ ~':~0 ~:~1 MADE FIHA~ ~T. NIU ~3 3/~ 3H X 11N 5~.~SING SP~L. TE~'~-TO ......... O .......... _ 15;~: ~_:00' 15.~: H~ ~*S. I~STALLE~ FL~LIN~S Tg ~ PITS ~ TRTP TA~K. q/~q~.~ D . VALVES AND ~AN~L VALVE TO CH~E AND KTLL L~,~. ~H~ES TO SUB--SE TO ~$e ~ILL LX~. AN~.~,O CHO~E HAHTFOLD. STARTED RUMHING ~EY ,, , L Z NES. . ...... .... , , ,., , , .... · . , . ..... ., .... . . .... ,, .......... ,. :- .' · . ,~ ,,,:~,~ ~. ,,,.~ ~:, /,~*,,:,, :*~ ,~ , .... i ., . .............. .... ~,,~ ,~,~? ~°C~,~, :,,, v " ,, i ............. _ _ ;~":'j :/;:~ .' ,..? ,'~': , ..... . ., . _ _ , ., ,_ ., ~ · DAILY ~LL ~T$ ~12~ ~ 108~14 DALLY ~$ 82~ ~$ lg&~ S~JOOr; M~R 07 '~6 07:00~M SHP DRILLIMG MOC P.~×~ ! DAT[-' ~)..~/0719~ RZG ~?.2~ I~C~ITRACTDR-OG~IXTIiq~ Cu~ ~.OO hfs DATE OF L~T B~ TEST: 0~I~/~ ~I~D DIRECTION: ~L~;TY ~ ~VE DIRECTI~ & HT. ~]T[ ~ U~ ~ PERI~ ROLL _ ~T. BLEND Ue~ ~0. HE~ING DRLLL ~TER ........ U~ ~L ~T ~TE~ U~ FUEL U~ PER~NEL DATA: ~C ~~ ~ to ~ TOTAL: ~5 BH1 ~NECTZ~ ~S to~ TRIP ~ ~ to ~ ~.~ ,. ~P NO. 1 ~CP ~ ' S~ .. ......... :..:..":...:.: ':..: · '.:.:,.:.9HA :N~fE ..'.'.': '., ~CP ~ ....... ~CP ,, ., . . . S~LE DEN: P~E PRESS: ~ _ _ ,,, 1. Z. , 3. 4. ,, 5. 6 ...... - BALL JOIXT ANGLE OFFSET D]RECTI~ ,,, ACCIDENTS RE~TED LAST ~ N~E OF 1NJ~ED : , - .................. EHPL~ER : .... ~;AL SEC. NO. : TIXE OF ACCIDENT; ' TOTAL BHA LENGTH': DE~IPTI~ OF H~S OH ~TOR: SER ~RS OH J~S: SER STATUS OF ~NJ~; H~S ~ ~S ~ HEVI ~:~:'"~ ........ ':', ....... :':'"¥'",' ...... ,',' ':' ':*' ':=,?'" '~'" '"; ""'" '"'*~ '" :' ~?'?' ~'""~::"¥':' :'?"'" *"'"" :"'?'"?'~ $ XrCT'&~AC~,', '~W:~S':'"":'''''''''''''''''''''' ""' "'"" ~'"""",~")"?*,'"'"'" '""""")*~"':" ?',7~:~'''?''''' ~: ":*' '77:": "~ ?'* ~""'*' :',:"': '*"~' HEA. DEPTH ANGLE DIRECTION T~ N/S E[~ VERT. SEC. Dog Le~ 1118 ..... 0.53 297.~ 111~.97 2.62 -5.70 5.94 0.035 1211 2.44 3~.03 1210.94 ~ .~ -7.~3 8.32 2. I0~ 13~ & .61 317.~ 1303.76 8.62 * 11.21 1397 6.60 316.07 1396.31 15, Z~ - 17,~ ~. 11 2.1~7 1~ 9.76 ~14,17 _1487,~ 24.,48 -26.70 .......... 3~..1~ 3,~7 1581 12.~ 311.31 157r.56 ~.69 -~O.O0 5~.23 ~.~G5 16~ 13 .~ 316.69 1~7.09 51 .~1 -55 · ~ ~ .39 1 .~5 1767 15.81 315,3~ 1~7,97 M,65 -71,87 ~,~ 1~3 19,~ 314.37 1935.40 107.93 - 111 .~3 155.1Z 1.765 Z~ Z1.06 31Z..~ ZOZ~.7~ 129.93 ._ -136.~ 187..0Z Z.ZO0 2~1 2~,2~ 31~.81 Z19Z,82 1~.43 - 1~,89 ~9,7~ O,~a 2~ 27.02 313.00 22~.T7 207.~ -215.57 ~.50 3.160 2616 26.96 313.~5 235B.~ 237.00 -2~6.23 ~1.69 O.~2O ~5~ 27.22 313.,~1_ 24~1 .~3_ 2~.33 .,,-276.78. , , NOTES; , , ....... - .......... _ MAR 06 'gG 08:04AM SHP DRILLIMG MOC P.l×2 03/06196 e~T ~) FIELD CC~EA CREEIC I~ELL #ANE CQREA CRIEEIC FED I; _~,~1000 DEEPEST TARGET TYDNEK - g ~700 PT%q) _ 900~ AFE.NO. ~3695 (141:)) 2585 (TV1)) ~ FOOTAGE 140JaS __.._. PiIESENT DP; CASING O.D. ~ LAST CASING SHe[ DEPTli ~6] ft. SHOE TEST .. PPG LINE2 1 O.D. INTERVAL ., - ' ft. SHOE TEST PPIS LINER 2 O.D. ~ INTERVAL __ - ft. $#OE TEST · PPG LI#ER 3 O.D. tNITrr~VAL _ _ - ~ ft. SHOE TEST ~ PPG DAYS ON LOCATtoN DAYS SILICA SPUD PROGNOSEO DAYS 14IX) bit 9.7 VIS &S PV ~J YP 1T GELS ._.2/ ~J pa 9.1 2 SOLIDS lJ BENT/SALT ~ 6 HPHT ~ ~ Pf/Hf 0.2/ ~.0 /~ DRtLL£'~D 63.~ BARITE /?.O (Lb/bbt) SP# #1 SPI4 df2 TOT SN4 PRESSURE _.___ TOT ANN VEL OP __________ DC CRIT JV: BIT PRESSurE DROP: ___._._ psi BIT tiP; ~ BIT HP/Jr~: ROTATI#G STRING UT. SLACK OFF blT. __ PiCK UP laT..--. BliA blT. IN HUD; CASING. itc CF RAId STAB N CEHENTI STRING,~___.__. 3000 PS SO PLIdPED NIXED 15.8 PPG D FLTS HEL iBLS OF PULLING AN~ ~EL Tl~ OT DALLY UELL ~T$ 919Z~1 (:UH$ ~10.~66/~ DALLY IdUI:)S ~ Supervisor; MAR 06 '96 08:06AM SHP DRILLIMG MOC P.~×~ DATE: ~ RIG lZ:~D CONTRACTOR DOtalTINE 1.01) CUm. S.O0 hrl; DATE OF L~T BOP TESI; O2[~/~ ~I~ DIRECTION: ~L~ITY ~ ~ - ~ ~ DZRECTI~ & ~ITE ~1 U~ ~ PERI~ ~ ROLL ~T. ~EAT U~ PITCH H~ _ ~T, BLE~ ~ ~0. ~ DRILL ~TER _~ Us~ ~L .. ~T ~TER Us~ '' - " FUEL ~ PE~EL DATA: ~C 1 ~ 17; .. ~C[~D ~S to~ TOTAL: . 32 BHI Z ~ATHERF~ 2 ~NECTI~ ~S . . to~ C~ER 1 O~LL TR~P ~S to , ~ NO. 1 S~Cp ~ __ SP~ ;.:"/",'.::,:':'::'~::':-~:~;~;::~?'"":" :' ';'~:'' .B~.:~:; b?:.'::~:.:'F~'?:;: 7.:~,:~::.:'"'":(::~::'::'." :.":'::'. ....... '::': .... ' ~.~ secP ., a ~ ~ . .- - se~ __ a ~ sa ........ ... . ,. ., S~LE DEN: ~ P~E PRESS: . ._ .- ' .... ANC~R TENSI~S (~000 I. 2.~ - " ,_ 3. - ~.~ ...... " ' 5. 6 ...... 7. 8.~ .... '- . . BALL ~01NT .,, ~ -. ~GLE OFFSET DIRECTI~ ...... .... ,, ACCIDENTS REP~T~ LAST 2~ H~RS: ....... EHPL~ER : .... ~iAL SEC. ~. : TINE OF ACCIDENT: '~OTAL BHA DESCRIPTI~ OF ACCIDEM~: ~S O~ ~T~: SER NO. -- H~$ ~ dARS: SER NO. STATUS OF I~J~ED: H~RS ON HEVI :."j:.:,'::~.: ):.' :.~.:...:.' '.(:: :...~:~':'.':..;:.;:..:.:. . ~,,'.:: : , ,, MEA, DEPTH ANGLE ~ ~~ ~~ ~ ~ ~1~~ 0.53 ~?.~ ~ ~ ~?.97 2.62 -5.?s 5.~ 0.035 1211 2.44 ~.a3 1 zl 0.9~ ~ .34 -7.~3 8~2 2. ~08 1~ A.61 317,~ 1303,76 8,62 - 11,21 14,~ 1397 6.60 316.07 13~-31 15.2A - 17.&~ 23.11 2.147 1~89 ~.76 31~,17 1487.36 24.48 -~6.~ ~.19 3.44~ 1581 12.~ 3~1.31 15?~.56 ~.'69 -~O.Od ~.~ 16~ ~3.~ 3~6.69 1~7.~ 51.~ -55.~ ~.39 1 1767 ~5.al 3~5.32 ~7.97 ~.65 -7~ .87 ~.~ 2.~23 1~3 19.~ 31~.37 1~5.~0 107,93 -111,43 155.12 1.765 __ ~_6 25.06 312:87 ZOZ2.74. 1~.93 -~34.54 ..... 187.02 2.~0 2139 ~.~ 314.03 21~.74 154.29 " -1~.22 222.39 2.857 2231 24.22 314.81 2192.82 1~.43 -1~.~ 259.74 0.~0 ~ 27.0Z 313.00 22~.~ 207.W -215.57 ~.50 ].140 2414 2&. 94 313.85 2358. ~ ~7. O0 - 244.23 341.6~ 0.420 ~ 27. ~2 ~13.81 244J,.43 2~.33 - 276.~ 3~. 03. 0.280 ,NUll S: , . ,,. , , , .... .. n ~!~'~* ,~ ~ ~m m, ,.:.:.,,-,,,,,,,,,,~:,-i-~-~ 'd~d'~';~k~, '~5~JLV~' "~'~15~4[~1111~~I~."!",',,,,'~ ~dddl.l... '-,,,,',,',,',,,,,, ,tl ~1~ , ". · . . . .: ....: . ,. . . . :,.- .... . :.. . . . -'~~:-: ~~. ,: ~~ '~' , , .... , .... ,.. .... ..: ,, .~..., ,; .- . . .: . · . ... ... I.IIIll(lll. l.lllllllll .... . .:',' .". ' ''1'~'''t IIIlllllllliii& I.l.i. , ,' ,', ', '. ' ........ * i ll,ll,lllliee.i i,, ,,:..,:,,, ,~ ..... *l~.l*lillillllll Il,I,, ,, . ,;'.;":~,'t.':*.:e.' I.,I,le,ll.lll&lll.I ,',1.1.,,:,,,,,:~..., IlllllJl~lJllllllllllllllJll I' i .... J''l'J' 'l'' JI'll' Ill'll'lilhll II ' ' ' J' 'il' I'l'lI I'lllllllllllJl ' 'J~' l'l 'l'J''l'' IlI'II'IIIIIIIIIHI .... JilillJllllJ~lJllJlllllllllllllllJl.lJ.', I Iii ' 'Il'( 'l'J'J'l 1111Iii11 ................. .,-,,,,,,,. ........... .,.,,.,, .,....? .? ~-~.,-,.,-,.~ ,,..,,,,,.,.,,,.,.,,,,.,, .-..~.,.,..- ~~~,,-,,,~,-,,- ........ .,. ................ -..,. ...... .,-,,.,.,,,,.,,.,,.,,,.,, .......... . .... ,....,,.,, ,,,..., .... :,-;,- ~:.: .. . .: ... : :. :]: '. : ': -: ': - ' '-.'-.~. ..-:-...'.:. : .: . '. >~ ]'.: : :: :'.: : ..".:.'.-..-:. ' .-:'-'. ... .: ..'.'.::.:..~~ ~:....'.:'.:'. ~ ::...:..: ... :. -.;:.'-:-%..:::......-..' :.::::.'?;..~; ':: .....~::..-...:. ':'._:.::: .. . ~.._ ...... , ..... ,., .... ..-.-.. ;-';'~ ;..,, ................. , ,-" .. ... ,,,, ...... I I I I II ~ATE OT/~ OPt ~ FJKIh ~FA CR~K ~LL NK ~ CREE~ T~ tl No I RIG 12~ ArC ~ ~ OC~E~T T~CET TT~BK a . %~ PT~ ~ AF~~ ....... D~PTN (~) ~ (T~) _~5~ F~T~ ~' ~P~S PRESENT ~; RUNNING..~SIN~T l, LA~ ~SZMG O.D. ~.3~ ~T ~SIMG SH~ DEPTH ~2? ~t. Sq T[ST __ ~G OAYS ~]N~ 1 g?Q~ INTERVAL - ft. S~ TEST ~ PPG DAYS SINCE ~ 8 LINER 2 O.D. ZMTERVAL -- - ft. Sg~ TEST PP~ PKUb~UbCU bAYS . ff ~H~ TFST P~ LlflCfl Z O.D. -- rllTifllr~i .. .. PI~ISH~. L.~glNQ. OllA. _qtll., ,~Zfl~LATED AT 3~86~_. REDUCED ~ ~tGMT.. ~H ~lll~..~ig 8~lNfi. R~ lo NUN ~S~G, ~TART~O RUNNING 9 5/8~.CA~TN~- . ........ .ill ill . ,. i .. · ,, i i · .~,- ,., ~ MT 9.5 ViS ~ PV 1~ YP 7 ~LS ~J ~ 9.2 ~L ~ HPHT ML ~ Pr/Hr 0.~/ 1.~ CL 900 Ca 2&~ X Oi~ ~ ~LIDS ~ BENT/~L~ 20.~ / 0,~_ DRILLE~ &5.~ BARITE 11.3 (L~L) , ,~ ~g ~1 60 ~ lZ _6Q TOT ~H 120 PRES~RE 1~0 TOT G~ 519 ~N ~L DP 101.6 DC ",.,~t,~',.;_; T,; m ~:;; ,.,;~ ~E';,~], ,';',,~,,T y~.:~::. _:'" [?,:~Fe'] l l.',::,un:', ,';~.,1 ~',:,.;'.,,1 F ~,[,~ ' q ~::.] :~ F~ E-~,"~:,~J .;i H~'::~, :::::~Z~'; ~: ~:;: QFF..~;'. .[:, '~,~' g~:?;:'.~, .... 1 I1 1T,~q GTX-1 C~XE ..... ~O ZO ~ ~1 G.O0 ~.? . dV: .,3~ BIT PRESUE DR~; ~.8 Fi BIT HP~ 2~.~ BIT HP/ln2: ii iii I ii i i RflTATINfi STRING ~. ~ BHA ~, IN ~ 5o Rm~ ~CK OFF ~. ~: p[~ ~ ~. T~: I~U::lJ:l:~l,.tllilL~l~1l: L.J~..-- -.-.-)T Tii:lli~lil'll II II ~~t~~1~.~j~.f~}~.~.~Hi~i~ I'l'{~"'lPtll'lJl~ll-ll~l'illlll'll~l~lll, iil]il~'lil'i~il'"l -~'~.~:~fl 1-~fl RIH ~ITH BNA. O 11:00 18:_3~ 7~50 CZRmHATED A~D C~DTTTDHED ~O AT Z585'., R~Q~CEO ~ ~ZGHT FR~,,!,,Q.2 D CF TO 9.5 PPG ........... ~h:~ 19:00 _~.5~ ~PE~ Sll~. "RL~ D~ LZN~S: 'SET KELLY BACK ....... O T~ 20:,]0 ~2;]0q Z,O0 6HA. L/D STABA~JZER~, COLLARS, CRO~R ~ PXT ~8. O 9H , 222]0 ~:~, 0.SPl ~LLED ~AR ~SKING. p CA ~eO0 OZ:~ 3.,Op R/U ~StN6 T~_'S; PILL'~ LL~ AND STABBING DE~D.,., -- P D .... ii I i i I I I i i i I ill i ii i i IiIi I I I I ,~ i .... I II .... iiiii i ii ...... i i..... I ... ........ ~,~ .'~ ?. , ,,,. ;. ~ ~: ' .? ?: .~., '.'~.~,.,,,;~ _ _ i ii ....... i i i i i i i .......... r.,~,~,v ~':~ '~,~"?,'~ ...... .............. ii Ill II I I IIIm I I ....... ..... '":~': .::'~,::~ ., ...... ~1 IIII .... ~,. i i I , ,, I I -, , ,[ R1\ V✓ lV UI Jl llll JI I� VI\1LL111V IIV I. I L.L I llllll Hllllllllllll Ill ll ulllll IIII lllll ll IIw, DSA I LUI '. ,, d:n . _. II II It II .{l Inil 111 II It ii Hll III I l f nlnl nlu luumlw inu uuu u u f:' I uu lulu uu I I I'.; I muuu a lo11 ll 11 a 11 l il i l Iii ,... , ....:..... III Inll 11 a1 a 111 II ff0 ))j1 i6il ulunu DATE: ZV.05196 RIG 12?0 COMTPâ–ºiTOP nMNTIME- CUK 4.00 hrc DATE OF LAST MOP TEST: 02/29/96 WIND DIRECTION: VELOCITY WAVE DIRECTION i HT- BARITE ,n Usm t[ WAVE PERIOD ROLL _ TNT. NEAT Used FITCH HEAVE CRT. BLEND Used BARD. HEADING DRILL WATER Used VOL POT UITGR LOW _ PERSONNEL DATA: MOC 1 POOL 17 FUEL Used • N! 1 EPOCH < BACKGROUND GAS _ to TOTAL: 28 SHY 2 WEATHERFORD 2 CONNECTION GAS to COOPER 1 -1R)T171a MAX. GAS SLOW PUMP RATES TAKEN s-1 1t- ... :NUMBERI s� PISW Me. 1 SRCâ–º i 31 _ _ RRLâ–º Y9 Immmmll OtIGF IM III mom 1 f 0' %1` N� _ 1 Bit L-IVLRr PUNâ–º NO. E SRCP a am 1 BIT SUM B.063 2.813 -97 SRCP R _ SPR 1 STA31LIZER 8.GDO 2.813 4.05 SHALE DER: PORE PRESS: I STEEL DRILL COLLAR PI 2.875 3064 1 STAD1LIiER _ 11.000 2.813 1..6? ANCHOR TENSIONS (1000 1DR) 1 STEEL DRIII Mt I AR B.063 2-875 30.89 1 CROSS OVER SUQ 8.000 .813 1.65 ],49.54 BWw IIY S.Uuu a.0 VL 55 1. 2. MECH. JARS 6.250 2.250 32.98 3. 4. 27 50 49.30 MWDP 5.000 3.000 832.61 5. 6. 7. O..0 JVlel ANGLE OFFSET DIRECTION AERIBERTS REFSATEL E4 own*: ,ta .I MA16 Ur INJUKLU : JEFF BARFIELD EMPLOYER : POOL ARCTIC ALASKA SOCIAL SEC. NO- :� TIME OF ACCIDENT; 06.00 70TAL BHA LENGTH: 10.3436 DESCRIPTION OF ACCIDENT: WHILE FILLING CAGING ptACHED LFFT INOER FINOFR MFTUEF.N HOURS ON MQTgR; HOURS ON JARS: MWN..1 IN III.: SLK MU. 40.7 SER NO. 0084 _ LIf4I54 AMU rnl IN• I IWt. RTATUC OF INJUACO: WENT TO EMEROFNCY ROOM AT 0630.. HOURS ON HEVI WT: II......... IH III IIII IIII I n IIII .liwuuminnniwilllllll IIL.::II I nil u' I i�f I n I in n1'""' .E11tie0 n�Y IqY �� Ia.l I11 III I11�1 I kyNts 1'.. I I i I I jl I i; •III 4 I�iJllllEilllmuumd IIIIIvERr. ... ' Ill ;� � I ncA. ucn AIIuL' VD . SEC u 1118 0.53 297.68 1117.97 2.62 -5.78 j5S,pL�� 9.935 tell e.44 OGN.U3 III 4.34 -7.43 L.SL 2.108 1304 4.61 317.72 1303.76 8.62 -11.21 14.W 2.338 1397 6.60 316.97 1396.31 15.74 -17 44 23.11 2.147 1489 76 314 1487.36 14.48 -26.70 36.19 3.447 1531 U.00 311.31 1577.56 36 69 .40.00 54.21 I.CLS 1673 13.75 316.69 1667.09 51.41 -55-20 75.39 1.645 1767 15.91 315.32 1757.97 68.65 -71.87 99-36 2.223 191 19 MR 21-06 114.17 312.87 KdY.W 2022.7E 1U:.Y3 1 Z51.93 111.4. -134.54 119 IF 187-07 I T.N -200 2139 23.68 314.03 2108.74 154.29 .160.22 222.39 2.857 2231 24.22 314-81 2192.82 180.43 -186.89 259.74 0.680 2323 27.02 313.00 2275.77 207-99 -215.57 299.50 3.160 2416 26.96 313.85 2358.64 237.00 -246.23 341.69 0.420 25D9 27.22 313.81 . 4 26633 -276-74 384.03 1 0.280 IIOTCCI EH�l M~R 04 ~96 07:5~M SHP DRILLIM~ MOC ,,~ i i i ii i 2ATE 0:510/,196 RPT ? FIELD CI~RI~A CREEK UELL )lANE .COREA_C~RI~EIC FED d~l No 1 RIG 1220, ~.FE S &271000 DEEPEST TARGET T_Y_~__EK a S70D PTUD 9000 AFE.IIO. DEPTH (l~D) 2S8__~5 (TVD) 2~1~_ FOOTAGE I~UliS PI~ESENT DP: LoGGING, - .... .,.. -- - . . .. LAST CASING O.D. ~ LAST CASING SHOE DEPTH .32? ft. S~OE TEST PPG DAYS ON LOCATIOIi LINER 1 O.D. iNTERVAL ~ ti. SI~E TEST PPG DAYS SINC~ SPUD LINER 2: Q,D. INTERVAL . . ft. SHOE TEST PPG PROGNOSEO DAYS LZ#ER :~ Q.D. INTERVAL ft. SHOE TEST ~ PPG , ,, ,, .... EXECUTIVE SUWIARY: FINISHED UIPER TRIP TO `110¶'.,. ~BU~. ,POOH. L/O DIRECTtrm.&L T_O~_LS. R/U TO LOG. RIH. ¢C~ULONOT CET PAST 2118'. LOGI~L~I TI~ SI41~ UITH SP DITE LDT C~L. POON AND.R./D....RIB RJqD TAGGED UP AT 21`18'. REANED FRON..2.118'__ TO 2585~. C_mJ: ~IIPER TRIP TO 2075~ .r_SLI. POON._ R/.U _TO. LOG. RIB ~IIT# ~P O~TE LDT I:NL. LOGU~u FRON_~S.B..S~ ..... ~ I~f 9.6 VIS '¢9 PV __~ YP-1~ GELS ~ t~ I~ 9.B UL 12 HPHT ~IL Pm_.1 Pf/Hf_O.~/ Ct 900 Ca 20--"0 Y. Dii Z SOLZDS ~9 BENT/SALT ~0.0T9,1 ORILL~-~ 56.7 BARITE 7.6 (Lb/Id)L) .,. · , .. SPN #1 65 ~ #2 65 TOT SPM . 1]I0_ PRESSLLllE 1500 TOT fda# 562 A#N VEL DP 1`10.0 DC 16_1_._8_ CRZT 229.2 :~ :~11#: ii: B~:Tj':~' j :iSlt2E'i:'.ii'] ?:: i~l~:~:~::',*i: !;:'.] :~.$ERTAL; #D._:,~ii*~ i:.i'*.dET C'32(~ );:' .... TEE.T':.:i'i.:i I~Ot~*S'.i~.l :i:;~T,/ItR!:.:: ii:OF.F,i:'*:~ *f~,",.~i,.~:il~.,::~:?~i !:'~_-B:::~:~:i~ 3 :12.~0i C-lVLRG ~15 15 15 ~_85, 2 2 I]2.250] C-OSVLR6 6J (~C) 115 15 15 2258 .34.7-(~-- 65,..07 _~585 I I UT A F & #0 TD 1 1 [1T._.5_OO~..GTX'_I ~_~_XX~ I~O ~0 ;~0 292 &.O0 73.00 ~327 avl 3~?.3 BIT PRESSURE DROP: ~ psi BIT HP: ~39.12 BIT HPIJrt2: ROTATING STRING UT. 110 BNA UT. I# MUD: 50 RPN: - PICE UP tiT. 11--'~ TOROUE: i)~Tkial': ~.._:,~,,,~"; '~ '~ ' --~---=-'~; :~'i'}'i~ ~i '~."i~ ~: '~.'.).!i~: ~:~:~':.~:~:' .i.: ~i '.:' :~. '!..i~ :::'_-:~ !..~:_OP!;I~TTO~'!:':'~I:!:".~ ~NC;E;:~"~'. ~'": ~ ~i. '.?~?i.i~ ~:~...~;':. '; i: ~. ~.)~.:.'.:;:::~:: :~::i~.':'~i!:?:i~::~:~:i.~:~:~ ~i i:' ~i::, i~.::d ~06:00 JO?;-~O 1.501 FINISHI~O talPER TR[P TO 1101'. NO PRO~LEHS. ~ TR 07:~0 09:~0 2.00 ._ P/U KELLY AND _u.a..SHEO..T.O._BOTT_~, ~;~eC'Ui~ATEO HOLE CLEAN.' 'PtJIqP[.~-SLUG. ___ O .C.F ~) TR --09t$0 11;00! 1.501 POOH taITN ORILL PIPE ....... .11:00. 12:~0 .. 1,50 L B_H,~,. L/D POTOR. I~k~. CROSSOVER Aim STAB. CLEAN' FLOOR. P BH 12:301 17:30 5.00 R/U SCaLmeERrER. _RIH I~ITH SP OITE LOT CNL.. CJO~_JLDNO_T__GETPR_ST Zl1~'- 0 LG POOH. eEI4OVEO HOLE FINDER. RIH. __et~_LDNOT GET PAST..2118* ....... L.OG..G[P __ER_~_2J]a' TO SHO~. P~H A~D ".1T;3~ 10:30 _!_,_~_#/U BIT AND STAB, b B# 18;30 ;)0:OO 1.50 Riff. TA~gl:l~ UP AT Z1,`18*. D TR ZO:O0 21:00 1.00~ TRIED TO _u~_.JC PAST. Z1~IS.*~..-?/U I~ECLY, ~ARNED THRI~JQM ~UT THEM C~F~JLD#OT O. UA ..... S[O THRC~JGH. BACK REAMED. P/U SINGLE AHD t, IASHED..AND_RE,~J~EiO, R;P ~;TH ONE STAND TO Z24`1', .05d_JL~n~i.OI_P~tH ~/ITH NEXT STAND ...... 21;00 22_*00" 1.00 '-pooh AND L/D .3 STDL RtH ,,td. ITH~3_.STD$ FROH DERRt¢i~. D DS 22:00 23:30 1.50 RE~.ED FROH 22~1' .TO"2SI~.'. , D ~.};~01 ;~&;$O 1.00 CtRI::ULATED HOLE CLEAN. LOT~' OF CLAY ........ 0 CF ....... D TR 00:]0 01:'~0 1.00 ~IIPER TRIP TO 207~'~. NO Qli30 0~:$0 1.00 CIRt;ULATEO HOt. E '~LEA# ......... D ~F OZ;_~.~_Q4;__O~ 1.5_0 P~I, .... D TR 0~;00 106;00 ~.OO R/US_CHLLMBERGER. R]H UIT14 SP DITE LDT CNL..TO..2~.8~'..I,_OGG_~O T-O D LG ;)1'18'. NO PROgLEMS. -- · . i . ., -- --- ' ........................... i. 'f., ~;~' !] " ' - · . .., . · '.',-4 'L.t _ .,, ,., ., .... - . _ ........ . . ~,,, ,. ,,. ,,, ,. . ' '~ .... i~']~i ~:i', 'i']~ "~':'.; I' '~ i',"c,:i Ii "':'"'r'F~Fr~:l~s:?;l .. .,:, . I,I ,, I ~ ,',;, ,, ,, ,:,.,., ,, ,. ,: )~'' DALLY UELL CDST~ __ 70.3 .~. CUI4~ 920L~5 DALLY 14U05 22.~_~ ~ . _~148~. Sup~rvtoor: PI~g I , I la MAR 84 '96 07:54AM SHP DRILLIMG MOC P.~×~ DATE: 03/O4,_/~ RIG ~ CONTRACTOR DOWNTIId[ ~ A.OO DATE OF ~ST ~ TEST: 02/~ ~I~ DIRECTION: ~L~tTY - ~ DIRECTt~ & HT. - ~ZTE ~3 U~ ~ ~ PERI~ ROLL ~. N~T U~ P~TCH HEA~ DRILL ~TER Us~ _ ~L ~T ~TER F~ U$~ PER~NEL DATA: ~ 1 ~ ~C[~ ~S _ to __ TOTAL: 28 BH] 2 SCNL~ER~R ~NECT I~ ~ to TRIP ~S ~ to ~. ~ 130 . ., , . , . $L~ ~P ~TES T~H O SR~ ~ ~ ~ :.': :~'T ~:~' ,~E ~'l P~'] ~ ::',; :?'.~:::',' :~: ~:.',?'':,':'.:''~: ' ' ':,'.~v~:~ ~: ~' ;t~.: :k~. ~: ::: ?'1 D :~'~".':?X';~::'~ ~ NO. 2 SR~ g ~ ~ I QIT C-I~RG 12.250 1.~0 SRCP g ~ 1 BIT ~P__,. ~3 2~3 2.97 S~LE DEN: ~ ~E PRESS: 1 STEEL DRXLL ~LAR 8.~ Z.~ 1 STABtLtzER 8.000 2.81~ ~.&Z AMCH~ TEKS]~S (1000 L~) ~ STEEL DR~CL c~LAR 8.~ 2.B~ 1 CR~S ~ER SUB 8.000 2.~13 1 3, ~, 1 HECH, _JARS ......... ~,250 2,250 , S. 6. 27 5" A9.3~ ~P , 5.000 3.000 ~2.61 , ~LL JOINT . ~GLE OFF~T DIRECTI~ ,, ,,,,,. ACCIOENTS RE~TEO LAST 2~ N~ OF INJ~ED : EMPLOYER ; ~IAL SEC. NO. : DESCRIPTI~ OF ACCIDENT: H~RS ~ J~S: AD.7 see NO. OO~ STATUS OF INJURED~ H~RS ON DC: H~RS ~ HEVI ~: ,,',,",". ................................. ;" ..... ~.~".:~`~:~`:~:~.;.~:~;~;~.~;~.~`~.~.:~:~:~[EYi.~;~:~s:::.?~.:~:~r:~:~:.::~::.:~.~?f:..?.~.:.~:.::..j¥::.:~:~:...~:.(.~.;~::;:~::::..:..:..:~::7::.~.?.?:(.;j~[~?:.:.~.~:.~:.~.~:~:~. .~,]~AC:.',AZ'~H(~CAN~d)~' ,S~S:OD.,," , ':'": 4": " ":,' ~ "' .':. '" '..": '"" .... '.:'"" : ":.,: ,.':.,',:.~ HER. DEPTH ANGLE DIRECTION TVD N/S E/, ~RT. SEC. D~ L~ 1~8 0.5~ ~7.~ ~7.97 2.6Z -5.78 5.~ 0.0~5 12~ Z.~ 320.D3 12~0.9~ ~.~ -7.~3 8.32 2.~ 15~ ~.61 317.~ 1303.76 8.62 -11.21 1&.03 1397 6.~ 316.07 13~,31 15.2~ - 17.&A 23.11 ~ ~,76 ]1~. 17 1487~36 26_,_48_ - 26.70 ~.! 9 3.~7 ~5~1 12.~ 311.31 15~.56 ~.69 -&O.O0 ~.~ 16~ 13.~ 316.69 1~7.~ 51.~1 -55.20 ~.~9 1 1767 15.B1 315.32 1~7.97 ~.65 -71.87 ~.~ 2.~3 1~3 19.~ 31~.37 1935.~0 107.~ -111 .A3 155.12 1.765 ~139 ~.~ 31~.03 ~1~.Z6 156.~9 -1~.~ ~Z~.59 Z.BS~ 2416 26.~ 313.85 2358-~ ~7.00 -2~,23 ~1.69 0.420 ~5~ ~7.2~ 313.8~ ~ 1, ~T 2~. 33 - 2~._~ 3~ ~03 0,28P . ,.,,, ......... MAR 03 ~96 07:~?AM SHP DRILLIMG MOC P.i×£ i i! ! ,, ...... DATE ~ RPT 6 FIELD COREA t'REEK I,~LL NAHE COREA CREEK FED ~1 Ho ~ RIG 122D AFE $ 4271000 DEEPEST TARGET TYONEIC ~) 5700 PTVD 9(X).__..~O AFE,NO. DEPTH (FID) ~ (TVO) 2S0~ FOOTAGE ~8 HOURS 18.00 PRESENT OP: IdlPER .T.~I.P .. w.,. -- , LAST CASING O.D. ~3.37~ LAST CASING Si40E DEPTH 327 ft. SHOE TEST PPG DAYS ON LOCATIaN ~6 LINER 1 O.D. INTERVAL - ft. SHOE TEST PPG DAYS SINCE SPUO LINER Z O.D. INTERVAL - ft. SHOE TEST ..... PPG PROGNOSED DAYS &._~O LI#ER 5 O.D. IMTERVAL - ft. SHOE TEST _ PPG __ EXECUTIVE SUNqARY: __DRI~LEp AND SURVEYED FROH 2137' TO 2507'. REPAIRED .HUO J~J~JP, DRILLED TO 2S85'. CBU. tdT~ER TRIP, ......... .. ........ . -- ..... ...,... ~ua UT 9./, VIS ~,S PV 36 YP __2 ~LS __~/~ p~ 10.__~3 ~ 12 HPHT UL __ Pm 1 Pf/HtO_g:~.6 1.6 Ct __ _90--~-. Ce q~Q ~ Oil · SOLIDS ~ BENT/SALT 2q;q'/ 9,10RILLED &8.? BARITE 5.8 (lb/bbL) , , .__ , ....... SPt4 #1 72 SPR ~ 72 TOT SPi4 lA& PRESSURE ._ZIO0 TOT GPI4 623 ANN VEL DP 121.9 DC 1~,3 CHIT 2 2 lZ.2501 C-OSVLRG 8J. 680 1:i 15 15 22581 3&.TO 65.07 .. 1 i - 17.5001. GTX-~ C~GXK ~O 20 20 292, 4.00 .TS.00 dY-' _~BS..O BIT PRESSURE DROP: I~S1.1 pGi BIT HP: 454.7~ BIT HP/inR: 3.858 ROTATING STR~NG UT. 110 BRA m. ZN ldUO; _6_0_ RPI4: 1S0 - 200 SI.ACS: OFF UT. ~ ta:)6: 1-25.-' PICK.UP VT. 11.__~5 TORQUE: 500. :~ START :~,i'T..)~'i:', H(~iiZS~ ~.: :':'i ,.i :!: :!,,:.,.i':,.: :-:'i' :'"!:':'. ':',:.' ! ..... ' ....... ,: !. :~,',i',:-:¥QPER~AY, t'Ol~lg',i'i f H":.,SEQUEN ciE,, !',!~!~!i:: :":' ":': :i ~'..i i:!/', ". ,:' :i ~i,,'.,:: :~: '.i:i,~::>.: .,.:'~.',:i'.::::i/...':: 'iii: :: ",i .i '.:,.'~ 06:00 :)1:30 15.50 DRILLED AND~S~,RV[YED FF~! ~l'TT, TO ;)507'. FORHATtONS STiCkY. HARD,.,T.O .... D DO SLIDE. · ~1;'30 ,0¶;00 ~,150 REPAIREU IqUO PUHP #~. REPLACED 3 LINER,S.~ND~_b'I~rA~B$. D RC. _ 01:00r03:30 ;~.§0 DRILLED AND SURVEYED FROH 75D?t TO 2585t... ~D,T, :) I,JR-~ D DD, . _ O:3;~SO 0.5.:00 1~_0 CIRCUALTED HOLE C:L£AN. PUI4PED SLUG. SET KELLY BACK. D CF ..~:OQ I~:00 1,00 STARTEO UIPER TR2P TO KZ~_JC OFF PT. . ..... D TR ..... ...., ........... , ...~ .. , i l i, . . .. ,.. - ..~ ,..,. ....... · .. ~ ,,,, ..... ~ ...... · ....... .., · ............. , ... . , . · . .................. ~" iii" "'~"~J , -- . i n, ~ ,.. , . , · -- ........... -"~'~'~' 'i!' '"_:"!D:~'''~L: ~'' ~' ,-,. ~ ....... ,,, ~: ~ = , . : .... _ ....... .,~.~_ ....... . .... .i ..... ,. ,, ,. ........................ , i DAILY t/ELL COSTS _ .~:58~1. CtJI4S 8&9957 DAILY UuDS 2TEA CU/45 ~2591 I Supervisor: Pl~l .. ! , ii MAR 03 '~b 0'?:28AM SHP DRILLING MOC DATE: Q3/05196 RIG '1~ CONTRACTO~ O(7.ml'IHE 3.50 tUN Z,.O0 hfs DATE OF LAST BOP TEST: 02/29[96 WIND DIRECTION: VELOCITY ~ ~ WAVE DIRECTION & BARITE ~ Ue~'d WAVE PERIOD ROLL C!,11'. NEAT LFa, ed Pl TCH HEAVE L~T. BLEND - U~ed BARO. ~ HEADING ~ DRILL laATER ueed VOL PO1 ~ATER Used ......... FUEL Used PERSOI~NEL DATA: HOC 1 POOL 17 - .. HI 1 EPOC# BACKGROUNO GAS 76 to 7_~6 TOTAL; 30 BH! 2 ~ CONNECT ION GAS to TRIP GAS to SLO~I PL~ RATES T~EIi s~ ft. I PlJ~P BO. 1 SRCP g ' SPM ': ". ':'i "~':i,::'~'.:!..:'!:.!:,,'* :: ':.: "'.::ii-.'!.:':"BI~A:: Nt~ER:.'-'./ii,? i::: !::::.! :..':'.":'::!~j L !:'i':" i:.::.'i ~':.:.~:.;:.;,:'~. ;:: :.~.,:.. SRCP ~ a SP~ ,.:.:Ti~R~I~?:OESCRIPTIOi~,i;.,:,'::, ;::':,:!:i_':.ii,:,::.:., ,, :.:i.'::,':..i~O~,:'.:':!.,!:':'X!::.!~:!:'~O. 'J_L':" _ .X ',:.:., LEN~G.~ H!, .: ..... PUIqP NO. 2 SRCP a -- SPH .._.1_ J}IT ,..12..250 t 1.~0 .... SRCP ~ ~ SP# 1 DO. HOLE MOTOR .. ?.813 -- 1 CROSS OVER SUB ..... ?.~a ~.B~3 1.62. SHALE DEN: PORE PRESS: '- 1 STABILIZER 8.000 .,:)...8~ ..... --- 1 HERS. UNILE..D. RL.G, 8'000 .~2.70 .... , A~CHOR ZENSIO~S (~000 tbs) .... 1 STEEL DRILL COLLAR . . 8,065 2.B-7~ }0.89 1 _STABILIZER . .8..~.~0 2.813 1. 2. ~ STEEL.,O. RILL [;OLLA~ 8.1)63 2.875 30.89 3. /*, 1 CROSS .OV. ER SU~ 8.000 .2:_8~1~ 1.65 $. ~ 6. ---- ~ 5" &9.~# ma)P... . 5.000 5.000 7. 8. 1 MECH. JARS .... 6.250 2,250 - -- .. 27 5" &9.3# N~R)P 5.000 3.000 ~ 83.Z.._61 BALL JOI~IT ,_ - ..... _ ANGLE OFFSET DIRECTION . _ -- .... ~ , _ ,. · . .. ... ACCIOENTS REPORTEO LAST 2~ HOURS: ...... NAME OF INJURED : ,, EMPLOYER : ....... - - -- S~X:IAL SEC. NO. : TIHE OF ACCIDENT: ........... 1QTR[. aaa LENGTH: 1091..2.z~ '" DESl~RIPTION OF ACC~D£NT: HOURS OB ROTOR: ~0.7 SEA NO. I(OURS ON JARS; /.0.7 SEA NO. 008~ STATUS OF iNJURED: HOUR5 ON DC:___~0-7. HOURS ON HEY! I~T: 40.? · ' i .'i :::::.;':':::::.:i!:.. :....': :.':'h:'::: .?:; i: i: .... i.' .' :' ,.FINAL AZIMUT]~(PLANNEO:): ~!5~'0~1 ' "':':'" ':"::" ':,"::'"":'.",i':"":"" ' ME~. DEPTH ANGLE DIRECT,.I.pN ZVD N/S ~/~ VERT. SEC. Don Leg .1118 0.53 297.68 1117.97 2.62 -5.78 5.9~ 1211 2.4,4 320.03 17_10.9/* &.34 -7.&3 8.32 2.108 1304, & .61 317.72 1303.76 8.62 - 11 .Z 1 1/'. 03 2.338 1397 6.60 316.07 1396.31 15.24 - 17. ~/, 2~. 11 2.1/.7 1~,89 9.76 31/,.17 1~,87.36._ ~/,./'~ -i~6.70 ...... ~56.1g 1581 ' 12.88 311.31 1577.S6 36.69 -/'O.o0 54.23 ~$./,/'5 167'5 13.75 316.69 1667.09 51 ./,1 - 55. ~0 75.39 1.6&5 1767 15.81 31.5.32 1757'. 97 68.65 - ?'1. B7 99 o ~,6 2. 195~ 19.08 31/,.37 1955 ./'0 107'.9S - 111 ./,$ 15S. 12 1.765 ~O&6 21.06 _ .~1~. 87 20~. 7z, 1L~.. 93 - 1 ~/,/,. 5/' 18T... OZ 2139 Z~.68 " Sl&.O'~ 2108.7/~ 15/,.29 -160.22 ZZZ.39 2.857 2231 2/,.22 314, .81 2192.8:) 180. &3 - 186.89 759.7& 0.680 2~23 27.02 313.00 2275.77 207.99 -215.57 299.50 3.160 2/,16 26.96 313.85 Z~SB. 6~ 237.00 - 2~6.23 341.69 0 ./,~0 2509 ...... 27.22 ~'13.n'l ~441 ./.3 266-3'~ -~76.78 _:58,4. O~J O .~80 ........ NOTES-' ..... , .... · .... ., P.1/2 ,,, DATE 0'~1021~;~ IiPT 5 FEELD L"~IEA L'I~EEI~ 1dELL B~ ~EA ~EE~ FED ~1 ~o 1 R~G _ ., AFE $ ~271000 DEEPEST T~T TYVEK · ~0 PT~ 9000 AFE.NO. DEPTH (~) _21~7 (T~) ~1~ F~TAGE 8S~ H~RS ZO.S~ PRESENT ~: DRILLING. . ., ~T ~$ING O.D. ~ ~$T ~SSBG $H~ DEPTH ~ ft. S~ TEST PPG DAYS ~ L~TI~ 5 LINE~ I O.D. _ ~- . 1NTERVAL __ - ...... ft. S~ TEST .... PPG DAYS SIN~ L[NER 2 O.D. /NTE~AL - ft. S~ TEST PPG PR~N~ED OAYS LINER ~ O.D. INTERVAL - ft. S~ TEST PPG ~E~TZVE DRfLLED FR~ 12~ 1503'_. C~. ~E UtPER TRIP TO SH~. DRILLED FR~ 1503~ ~0 ,, , , ~ m 9,~ VtS ~ PV ~ YP ~ GELS ~~ ~ 9.0 ~ ~ HPHT ~~ ~ Pf/Hf~ 1.4 CL ~ ~ 1~ ~OJL __ ~DS ~ ~NT/~LT _~0.~ / 0.~ DRILLED 59.~ BARITE-10.~ (Lb/~L) S~ ~1 ~ ~ ~ ~ TOT S~ ~Q PRE~E ~ TOT ~H 605 ANN ~L DP 118.& DC 17~,2 ~[T ~.~ 2 Z 12.250~ C-~RG aJ ~ 15 15 15 1810 22.00 ~.27 1 1 17~500~ GTX~I ....... ~XK ~ 20 ~ ~2 &.OD ~.~ 327 JV~ ~.9 BIT PEES~RE DRY: 1161.~ psi BIT HP: ~ BIT XP/i~: ~.~ ROTATING STRING UT. 1~ BHA ~. tN ~: ~ R~t 150 - S~C~ OFF UT. ~ ~: Z~ - PIC~ UP UT. ~ T~: ~tO0 10:30~ ~.50 DRILLED AND ~YED FR~ 1Z80' TO 1503'. ADT 2.5 HRS. D 1~:~0 1&:GO 0.~0 P/U KELLY ANO ~A$~_TO ~TT~, D 1~:00 ~:00 16.00 DRILLED AND ~VEYED FR~ 150], TO 21~7'. ADT 11 HRS. O DO .... ... . .,..~ ....... , , , ...... , . , ........... . . ........ - .. . ................... , ....... , ',, ,,,;~,~,,,,~,.,~.,],,,, ............................ _ ............. L MAR 02 'gb 07:45RM SHP DRILLING MOC P.~x'2 , i l l DATE: ~ RIG 122D CONTRACTOR DOUNTZI~ ~ 0.50 hfs DATE OF LAST B~ TEST; 0~1~/~ Wire DIRECTION: VEL~XTY __ __ ~ DIRECT/~ & HZ. - ~]TE ~ U8~ 1~ ~ PERI~__ R~L ~. NEAT u~ PITCH HEA~ ~T. BLE~ Us~ ~. __ HE~I~G DRILL ~TER Us~ ~L ~T ~TER Us~ - ~EL U~ PER.gEL DATA: ~ 1 ~L HI 1 E~H ~C~D ~S ~o TOTAL: 28 BH! z R&K 3 ~NECTI~ ~S ..... to _~ _ TRIP ~S to SL~ ~P ~TE5 TArN g ft, ~P NO. 1 ~CP g SPH .:.~.:??.~ "! ~?:.~.%..i..>'...~ '.~.::~ ::. L'.!.~i~BH~} ~::.~ 2.'.:::"..'~i~: ~:.:...::i..~?/.~: ?:~:?.:~:.~":~:: :~'..~ ~P NO. 2 ~CP a -- Sm - ~-B~T .......... 12.250 ~CP g -- SPH 1 D~HOLE ~TOR ......... ~,_8~3. 25.66 - ~ ~ CROSS OVER SUB 7.93~ . .2.81.$. SHALE DEN: ~E PRESS: ~ , 1 ~1AB~LIZER B.O00 2.B1~ __.1 M.EAS~.~ILE DR~G, B.O00 32.70 ~:~ TE~SI~S (1000 i~) 1 STEEL DRILL COLLAR a.~3 2.8~ . .~0.8~ I SIABZLIZER 8.000 ~.813 1, 2. 1 STEEL~RJLL_~_~ 8.~$ 2.8~ 30.89 3. ~ 4. : ...... 1 CeOS ~R..SUB ......... 8.0pO. 2~1~ 1.65 ... 5. ' 6. ~ 5" A9.3~ N~P 5.000 ~.000 92.55 7. 8. 1 MECH. JARS 6~50 2.250 ~- 27 5" AO.3~ H~ ..... 5.000 3.000 83Z.61 , ~LL JOINT ANGLE OF F~ET 01RECT I~ ........................................... ............. ACCIDENTS RE~TEO ~ST 2~ ~S: N~E OF INJ~ED : ....... - ENPLOYER ~ , . TINE OF ACCIDENT; TOTAL BHA LENGTH: , . DES~PT]~ DF ACCIDENT: ~S ~ ~T~: 2~.0 ~R NO. N2-13~ ~s ~ JARS: . Z8 SER NO. STATUS OF INJU~EO: H~S ~ DC: 1~.5 ~S ~ HEV~ VT: 13.5 REA, DEPTH ~GLE DIRECTTm T~ N/S E/U VERT..SEC. Dog 0 0.00 0.00 0.00 0.00 O.O0 O.OO 0.~0 3~ 0.28 3~.~ 376.~ 0.~ -0.~ 0.89 0.07~ ~0 0.47 2~.~ ~9.~ 1 .~ -~.56 ~.69 0.~4 1118 0.53 297.~ 1117.97 2.62 -5.~ 5.94 0.0~5 ~2~ ~. 2.A~ 320.0~ 1Z~0.9~ ~.~ -7.A~ 8.~2 2.~08 " 1]0~ ~.61 317.~ l~O3.r6 8.6~ -11.Z1 t4.0~ 2.'~$8 ' 1S9~ 6.~ ~16.07 1~.~1 15.2~ - 17.~ ~. ~ ~ ~. ~A7 1~ 9.76 31A.17 1AB7.~ 2A.~ -26.~ ~.19 3.AA7 1581 12.~ 311.~1 15~.56 ~.69 -~0.00 54.23 16~ 13,~ ~16,69 1667, ~ 51.41 -~,~o ~.~9 1 .~5 1767 15.81 315.32 1~7.9T ~.65 -71 .BT ~.~6 2.223 1~3 ~9.08 ~ .~7 19~5 .~0 107.93 - 111 .~ 155.12 1.765 2~6 21.06 312.87 2022.74 129.93 - 1~.54 187.02 2.200 ...................... HOTES: ......................... .............. ..................... i MAR 0~ ~96 1~: 14AM SHP DRILLIMG MOC P. 1×2 i i iii ii i DATE .03/01/96 RPT ~ FIELD COREA CREEK HELL NAME .C~OREA_CREEK FEI) #1 NO 1 RIG 1~2~ AFE $ ~.271000 DEEPEST TARGET TYONEK g 57130 PTVO ~_QQQ AFE.NO. ~0069~ DEPTH (l~D) 1280 (TVD) 1280 FOOTAGE 955 HOLLRS 1/*.50 PRESENT OD: DRI.LL.I.NG.. ..... LAST ~IIIG O.D. 1:3.1~?~i LAST CASING SHOE DEPTH 3~7 ft. SHOE TEST PPG DAYS ON LCIC~TION LINER I O.D. INTERVAL ft. SHOE TEST PPG DAYS SINCE SPUD LINER 2 O.D. INTERVAL ft. SHOE TEST PPG PROGIIOSED DAYS /~0 LINER 3 O.D. INTERVAL ft. SHOE TEST PPG EXECUT i~E SLqIqART; FIN[SHEO__L/I) P~PE_FR.C~I&..DERRI .C~C, .INL/U_D!RECTZONAL .BHA, ITJEPAIREO SCA._. CgU. OglLLED r~l~Nr ANO FLOAT EQUIPMENT 321~ TO ~?~. CBU. OI~ILLED AND SURVEYED FROI4 ~327'~ TO 1280*. ....... · MUD UT 8.9 vis 7~ PV --1/' TP 15 GELS ~ZZ pH 8.7 gL 14 HPH~ gL -- Pm~l Pf/Mf~O_;1/ 0.___~9 CL 900 Ca ~00 X OiL X SOLIDS ~ BENT/SALT ~ / 0.1 ORZLLED ?~ BARITE 9./~ CLb/bbL) SPN #1 __7C)_ SPN #Z 7.__.~0 TOT SP# 1&O PRESStJIZE 2000 TOT GPBI 605. ANN VEL DP 118.6 DC 17&.2 CRIT 2/,5.6 .?:RUii~ l;ill~T~i'i'':::S-[2Ei:::i .:',;i:;!i::.T;YPe::~: ii.i::::', .:SEIki AE,:iNo:~,~!;:ii:,:,i.::dET(32.?~:): ;: ii,;:FEET;,;!i f:,';HoIJRS~::? ::-'F~',;fae,:i:::':.'.O-F-~.::-~ 't":i_'::O :::.':Oi.:::-,l~'i-:-,.: 8:,:: iO:~:.-' S.~,::,'R' ,~' 1 1 17,500] .GTX-1 .Gg~I~K ,20._20_~0 :___~92 .._~_.0.0 T~_._O~_. , __ ..... , &VI ~7~,9 BIT PRESSURE DROP: 1117,4 I~t BIT HP: ]9~,&] BIT HP/in~: . · ROTATING STRING RT. 82 BNA ~IT. IN NUO: 60 RAN: 150 - ZOO SLAC~ OFF ~. _~Z ~o~: ~ - 20 PZaC uP uT. 80 TmQu~; ~_~I~;T '1 ,~'~HOi' ,: HI:~JRS' :i'!'::i:~:~!:::,::, i.:~:::?;:ii:i:.:',ii~: i::,i~i~::::::~::":~:?:: :':~' i!:,: .!: ::i:~lpEl~Ay; oHsi:i't N': ,~daUl~NCg-: ;:'~,. i.i:::.: .:%::.i::i.:,;::?~;~ ::iii.i:::. ::.:.::;.:::.~:.-::'.:;'ii:?-!;'?:? :"'.::.: ~! ?i".:':i~. 06:001 07;30 1.50 FXNI$~IF.J)__LZO~LP_E F_ROPIOERRICK_RND_ CL£_AR~NE.RIG _FLOOR. ...... D DS 07:301 13:00 . S.50 P/U ANO #/U OIRECTIONAL BNA. P/U__KELLY AND A_TTEHPTEO TO BREAK: D_ CZ RCULAT I ~ r 13-'00 1:3::30 0.50 REPAIREO SIC:R~MUO PUPIP ELECTRICAL PROBLE~ptt ~ RC 13~30,1&:00 0.50 CBU. D CF q&:otli15:00 1~00. TAG§I~P CHT AT 3~1', QeILLEO C#T ANtD FLT EOU%PWlENT FRO~I 3~1' TO 327'. O O0 _~15;_00 15::30 0.501 CBU. .D. Cf I..1S.::30 .06:00 !.4.501 ORIL'LEi~'ANO SU'RV~YED FROM ;327' TO 1280~. AOT 8 HRS. STARTEO SLIDING'' D Dq ._. AT 1162~ AT 0~00 HRS. , ~ .......... , , , , i i ........... · ...... . ~' ,,ii~ i?,','::,', ill '?' ~: ..... :~' ,',",, ~I ......... 12 ................ DAILY HELL COSTS ~ CL~ ,, 76S2~0 OAILY NUO$ .... !6~'_ CUH$ T~S2 Supervisor: P_KB. MAR 02 '96 12:lSAM SHP DRILLIMG MOC P.2/2 i I I I .... I _ _ DATE: 0:5/01/96 RIC I~;L~ COI~TRACTOR DOtJNTIHE 0.50 CLIH 0.50 hr~ DATE OF ~ST B~ TEST: ~/~ ~X~ DIRECTION: ~L~zTY . ~ - ~ UA~ DIRECTION & HT. - ~ITE 91A U~ ~ PERth__ ~LL ~T. ~EAT Us~ PITCH __ HEA~ ~T. BLE~ us~ B~O. HE~ING ~ DR~ LL ~TER ul~ ~L ~T ~TER U8~ FUEL U~ PER~NEL DATA: ~ 1 ~L 17 .... MI 1 E~H ~G~D ~S to TOTAL: 28 BH] ~ e~ 2 ~NECT]~ ~s to , TRIP ~S to ~. ~S 20 SL~ ~P RATES T~N a ft. , P~ NO. 1 ~ __ _ g -- ~M :"?'"'" ':?:: :''~': ~'~ ?"~ ::' :'"'":" ...... .'T.'.:,:,:,eHA~:~ ~BER'~:.'::~'-~: :' ~f~?:~'_?_::~?~'::;:.:~.' ' I:1 1~' ~'P:':1' ~ : :: ::~1 ~. SR~ a ~ ~ :'TQOL'~:S~XPTIa':~': ......... ':" .......... ': :":?,:,',,~'.?: ...... X'.'~::?IO' .X "LENGTH.:. ,, P~P NO. Z SRCP 8 ___ ~ 1 ~IT 12.250 ,,, ~cP ~ ~ .... _1 P~HOL~ mTOR 7.81] ~r6~ SHALE DEN: PaE ~ESS: 1 STABILIZER 8.000 2.8~] 1 HERS. ~HZLE DRLG. 8.000 3~.70 ~CH~ TENSI~S (10~ L~) ~ STEEL. DRZLL COLLAR 8.~ Z,.~ 1. ~. 1 STEEL DRILL ~LAR 8.~3 ..2.8~ ~0.89 ~. &. ~ I ~SS O~R ~B - 8.000 Z.813 ~..6~ 5. -- 6, ~ 5" &9.31 H~P ..... 5.000 ~rO00 92.55 7. 8. 1 KECH. JARS 6.250 ~..~p ~.~ ~LL JO~MT ......... ~GLE OFFSET DIRECT]~ ........ .. . ,, .... ,i , ~IDENTS RE~T~ LAST 2A H~RS; ._ N~E OF XNJURED : .., E~L~ER : ~ZAL SEC. NO. : ., , TIME OF ACCXDENT: . .... TOTAL BHA .LEngTH; DES~ZPTI~ OF ACCIDENT: H~RS ~ ~T~; 14.5 SEE NO. M~-131 H~RS ~ J~S: 1~.5 SEA NO. 00~ , i STATUS OF INJURED: H~RS ~ Dc: 1&.5 H~RS ON HEV] ~T: ,-..:,.~:-~ :-.::.. :;.:.:-:, ~,:.:-:. :~:, : - :,-::.;:. .: -. :..:,. ...-,,, ..,~ ~..:,:? ~?:,: ~ :.,:.:.,:::;:,:~-: ~:: ~: ~..~D'J:e~CT:X'~/:~:YS. :':,,,: ~.:~,.:~ :. ,:.'? ::., ':':': :., ,: :...: ::? :',. ~: :~:... :,~: ,:?: . '::,: ",.'.:..,,, ~,.. :':'?',':;'"":';"::::: ': ::'~::~-:':',:~::',';'"" '? ' ::" ,' ": ~'? ::':'::~ :,/ : ', ~]NAt'~'AZlMU?H~PCANM~O):: ,~15'/00, ,': ,' :', ." "::'.;. ' ". "':' ...... '"' '":' ' "~&~E~TH AN~LE D]R~GT]~ T~ N/S E/~ , VERT._ S~C. Oon Lag 0 O.O0 0.00 0.00 0.00 0.00 O.~ 0.000 3~ 0.28 3~.~ 376.~ 0.46 -0.~ O.~ 0.074 ~0 0.47 2~.90 839.98 1.~ -3.56 3.69 0.~4 1118 0.53 ~.~ 1117.97 Z.6Z -S.~ 5.94 0 1211 ~.44 ]~.03 1Z10.94 4.~4 ., _-7~43 8.3~ ~.108 . .. .............. ........ , ....... . .. NOTES: ................. ..... .,., .. ........... FEB ~9 ~96 06:34AM SHP DRI:.LIMG MOC P.l/2 :::':;:'. ~:i.: ::: i:; ':'.~ :::.::: :::'" ;::.::: i'::::'.?:':::.'.::';:/:.':'.:/.~.':' :;.'.:'.,'. '.:: '/':.'..1 '.' :::,'. ::'~ :.?;.?. '.~...'~;:'.; ,,:...':.; .. '::-'..: .... :,: '.: :..: ..':. ::'-'.-':' 2 '.'i ':: i.::: :::-~ :.:~:;.:.'.' :.T-'..!;,: :::::::::::::::::::::: ~;' ::~.'.;..~,',:'/,,::'. ::: ::: ; i:::';!' '.:'.'-'.'.,.:: ..: :: '.:. ::. :.:::::.'::.:: ':..:(.:/:",'" :":.;:i ::: :.'.: ::i:..;.: ;:i ::;::?:.::.' DATE 02129/96 RPT 3. FIELD COREA CRIEr ELL NAHE COREA. C~EEIC FED till No 1 RIG iZ2D AFE S &271000 DE~EPEST TARGET T¥I~II~K: ~ 9000 PTVD AFE.NO. DEPTH CPlD) 32? CTVD) ~ FOOTAGE HOURS __ PRESENT OP: L/D plP~ FRDIq DERRICK. · LAST CASING O.D. ~ LAST CASING SHOE DEPTH 32__7 ft. SHOE TEST PPG DAYS Oil LOCATIOll __~ LINEn 1 O.D. INTERVAL - ft. SHOE TEST PPG DAYS SINCE SPUI) LINER 2 O.D. INTERVAL - -- - ft. SHOE TEST PPG PRCK]NOSED DAYS LZNEIi :3 O.D. '- INTERVAL - ft. SHOE TEST _ PPG · ...... EX~CUTZV~ SUN4ARY: R/U, DIVERT, ER S~TEPI. BELL NIPPI~E _A_.up_ FLO, I~INE. FUNCTTON TESTED D.Z..VERT~.R ~ TI~STET) ACCUNUt_ATOIt. L/l) DRILL PIPE AND BHA FItOI~_DERRICK ......... · .,.. . i l, ,., ....... ..... oo ,,,~ · ii i , · iii Nm VT _8._~ VlS_~ PV I_.T. YP 16 G~LS 1_~._~.~ pH ?.9 ~. ~_.~5 HPMT aL--. ~ P~/nt / 0.2 CL ')l)O Ca 160 2 OiL Z ~OLID$ __~ iIENT/~< :ZO-O / 0.1 DRILLI~D 12.3 BABITE -~ (Lb/it)L) , .. , .. , .. SPN itl SPII 112 TOT SPIq PRESSURE TOT GPI4 __ ANN VEL DP DC CfllT -: RTIN#1 '~ at'T ~i?, '::.S ~E'i'i'.".* !'/:!;'-~";T'~YP~· '': ~' '~ !' '~: ' :*.'~E~! Al::~O;'!~_ ':,_ '. ? ET¢~2 ~ s):,j, ,:_F EET,:,,: ' : HOUR$:~'!i ': ',P'.T~HR !! '/ i:~..~-.'..'! I: :::: O. !:/D: ',.L ........ D' .. ,i --- , L -- · , ,IV~ BZT PRESSU~IE DROP: ~ psi lift HP; BIT MP/~nZ: .... .... ROTATING STRING UT. BHA biT. tM HUD: _ RPN: - ___ SLAC]( OFF UT. ~ IdOO: ~ - __. PICI( UP t/T. TORQUE: ~,_..:..~l~.t." i~:' t:Hll,~, ~'tiOUtl$ -~:;': ~::.i.-~:. ;.;.:.: ::~ ~:::i.;:.~....::v:.,.: ,::'::.::.,..: :~.~:~ :,..: .:.;: ::.'TaPl~'lriT t ~,'.~ :lk.!i,~im~li~E!:.:!"._.:...._::..!.: ..: .!.'_:~t:i:~:'~':~:'.:.':':::':;::' t:;,.:~.:...::..:~.~. :::.::~? ::i. i:i:::: :(.::..~: :~::; ~:..'.:-*.: i.? ~P:: ~;.'_,.-" ~~! 06:00 'Z&:O0 18.00 N~J DIVERTER. SYS7~I_,, R/U HYOI~AUtlCS. II/U DELL NIPPLE AND FLOWLINE. ,,, p 24:00,01t~0 1~50 FUNCTION TESTED DIVERTER.SY,~.T~,)4. TESTEO ACO_q4ULATOII. WITNESSED BY _,. D PT AflK. rr. _0~_-,~_O. __~;,_~1 2.50 BR~K ~PS -~TS AND TrY USED ON CE~#T J~. L/D DR.tL.~_P!?E AND gpa FRON P DS DERRTC~ ............. .. . . ,,. ,, . , .. ...... .............. .... II I .,. , ,., ,, ........ ..... i i ii i · · - , , ,,., , . i .. . , _ i i i i i i ii i iiiii ........... __ _ ,. i i i ii ii II ii i iii I · _ , , , ,-~ ~-~ "r~, f", ...... , / ~ --' ,~ i ........ _ ...... ...... c ;;'",,' L;,',r, ,;"~,';" r', · ...;.~.~ .... '' ' -. ..... ,, , ,, , , i,m il,, ..... "1 , DALLY ~ELL I I[ IIII - I I I FEB ~9 ~96 06:~AM SHP DRILLIMG MOC ~"~ DATE: ~/'~9/~N~ RIG 1ZL~)... CONTRACTO~ ~TII4~ DATE OF LAST ~P TEST: ~~6 WIND DIRECTIOn: ~L~ITY __ __ ~VE DXRECTX~ & HT. ~T. ~T U~ __. PITCH HEA~ DRILL ~TER _. _ ~ ~L _ PER~NEL DATA; ~ 1 ~L ~L Us~ ,,, - NI 1 EPOCH 4 TOTAL: 27 I~X 3 ~CC 1 ~NECTI~ ~S to TRIP ~S ~ to SL~ ~ ~T~S l~Eg g ~ =o. I ~cp a - ~ s~ '"'.:':'.: ''.',?,:'.~'.::~:.:.:':',:c'~:: ~:~e~:..~e~:':.:~?::':..::~: :',:L'i..~.::L:~:,~:..~?;':::'.,::,'.'~'~"~:.:::: '- :: ::'::' ;:~:~: ~) ~CP -- a ~ S~ ~'::~:;b~'~'i~T.l~:~:: ;:.':'~::::'::"':":':.':' :' ':' :'::':::'W :'...~..~:~.~'pk'.lD'?:~': ~P ~. ~ SRCP a __ S~ .... ~CP ~ S~ ....... '-' S~LE DEN: __ ~OR( PRESS: __ _-- ~CHO~ TENSIONS (1000 i i i iiii 3. 4.~ 5. 6. ., - ........ ~. 8.~ ,..,_ ~CC dO]NT ..... i ii i ~CI F BFF~T DlOi~l~ ...... ' .... ii . . i .. ~CID[NTS RE~T~D ~ST ~ ~ OF l Kd~ : ~L~ER : ~l~ SEC. ~. : ., , - - .... , TOTAL BHA DES~IPTI~ OF ACCIDENT: H~RS ~ HOT~: ..... ~TAT~ OF I~J~ED: ' " H~RS ~ DC: ~RS ~ HEVI ~: _ ....... · .=.,:...; ..: ~: , ...... ::,~ ~,:,<:. ,.: :.. :. :: :,. :,,,:~?~'e'g~i'~C~y~::'"~:::: .:,.:,:. ~: .,:,:.:' :,.:, ,..~::...,. ~ 0.00 0.000 ... .~ 02128/9~ RPT ~ FIELD ,COREA CREEK tdELL BANE CCMEA CREEK: FED #~ 14o 1 , RIG S &271000_ DEEPEST TARGET T~o#E~ ;g ~000- PTVO -- AFE.NOo ~E~)(X)695 (HO)- ~ (TV~)) __ 32~_ FOOTAGE HOURS CASING O.D. )3.&L)5 LAST CASING SHOE DEPTH ~ft. LXNER 1 O.D. ]NTERVAL ~ ' ~ ft. LINER 2 O.D. ____._ Z#TERVAL ~ ' _ ft. LZNER 3 O.D. ._.___. ZNTERVAL - ft. PRESENT SI4G~ TEST PP~G ~Y$ ON LOCAT)OM SHC2~ TEST -' PPG I DAYS SINCE SPIJ) SKQE TEST PPG ~ PRQGNOSEO DAYS SHOE TEST ~ PPG L #AOE CU1 #UD MT ~ VIS ~9 PV ~ YP ~ GELS ~ &2 pH 8.0 UL l& NPNT VL _ Pm___ Ci ~ Ce ~ ~ OiL __ X SOLZDS _.~.~ENT/SAL-"~ /-'" 0.1 DRILLED ~&.8 BARITE ~ CLb/bbi) #1 SpIdl J2 TOT SP# PRESSURE TOT 6Pl4 _ ___ ANN VEL DP ~ DC ~ CR[T __.___ JV: ~ BZT PRESSURE DROP~ ~1~1i BiT HP~ BIT #P/in2: ROTATING STRING MT. ~_ SLAC~ OFF UT. ._ _ PIC~ UP UT. ~ BHA VT. TN 14UDt ___ PUHPEO OAtLY YELL COSTS ~/T 'd DAILY RUOS 856. ~ 5232 DOW 9NI]]I~G dHS W~80:/.0 96, 8~ DATE: ~1~'~19~ RIG 1720 CC~ITRACTOR DCRaITIME ~ hrs DATE OF ~T ~P TEST: ~ U~ND D~RECTIO~: UA~ D[RECTI~ & ~T. - ~R~TE 91& ~ UA~ PER]~ R~L ~T. ~1 ~ P~TCH X~ DR~LL ~TER Us~ ~L ~T ~TER ~ .... FUEL Uo~ PER~NEL DATA: ~G~D ~S to TOTAL: ~ ~NECT1~ ~S ~ to TRIP ~S to SL~ ~P ~TES T~EN a ft. ~cp a ~ s~ ,:::._~-~LOES;~tPT~',"~:":.":~:'"~ ....... "':'"" ''~' m.,'."~ P~P NO. Z ~CP ,, ; ~ ~PH ...... =,, ..... S~LE DEN: ~E PRESS: ...... ~CH~ ~ENSi~S (1000 t~) .... ...... 1. ~ ................... 5. 6. __ - 7. 8.~ -,, ....... BALL dOINT ...... - .... ~LE OFFSET DIRECT~ ..... , . .. .......... ACCIDENTS RE~TED LAST 2G ~S: .... ~ DF laJ~D : EMPL~ER : ~IAL SEC. NO. : ..... TI~ OF ACCIDENT: , ~ _ DESCRIPTION OF A~IDENT: H~RS STAT~ OF INJURED: H~RS ~ DC: H~RS ?~:~:~:~::~::.:%, :,,~,,~:.,,: ,.: ;:.;?,:?. ~, ~?.~' :,~.~.,,~,:?',~:;.::?~ ??,'.. ~,:~.,,. :~::~,. ~:,,;~ :,:,:?:,:~,: ::',~,,~ ~,x~.~ ~z ~. :pt~'}',~::,.: ~., :,,:,..,,, ,,: .,,,,:,:,:,:.? ,:::~ F,,.~ :~, ~. ?,~:,~ :,,,,:,::,,,,~ ::,: :, ,,~, :.?, :?~,~.,~,.::,::,~ :,,,:,,,, :,:,~:,,: ....... ~ERJEPTH ANGLE DIRECTI~ T~, N/S 0.00' 0.~0 .,. , _ , . . ...... NOTEs: . .., ..... , .... · , .... ,. ,.. .... ,,,, ~?~'~ DON 9~II~I~G ~HS N~O~:ZO 96. 8~ 8~ iiii i i · [ i ~ATE 02/27/96 RPT 1 FIELD C~.A. CREEl: tELL MANE (~IIREA Cl~EEIg: FI~D l~l No 1 RIG. 122D I~FE S /,271000 DEEPEST TARGET TYt~I~K g 9000 PT~I) AFE.IIO. ~ C)EPTN (IqD) ~ CIAO) ~ FC~TAGE ~ ~LIR8 9.00 PRESENT OP: LAST CA~XNG O.D. ~O.00CI LAST CJL~IliG ~J4DE DEPTH I~I ft. SG TL~T PPG DAYS Oil LOCATION LINER I O.D. INTERVAL ------ ft. SG TEST pPl~ DAYI SINCE SPUI) LINER 2 O.D. INTERVAL ft. 5HOE TEST PPG PROla#OSED DAYS LINER ] O.D. ZNTEIVAL -- - ~ ft. SHOE TEST PPG ~ .... ii EXECUTIVE SUI44ARY -' ACCEPTED_RIG FRC~_I~C~_AT...1 .4~0 HmS 2-26-96. TAGGED AT :~S' S~OC)~D k~l~lc AT ~ )4RS. COHTROL DRILLED FROH ~35' TO :327j. CIRCULATED. #AGE SHORT TRIP T~ ~FHOE AT 111'. CIRCULATED. i ~-- · . , . .. HIJ) UT 8.._.~g VIS 75 PV 1_.~2 YP 2__~6 GELS ~_~ 31 pH 9.0 UL 15 HP#T Ut.__ ~ Pf/14f_~._~/.O.:3 Ct 1_0~ cG /'9 2~ OiL X G:X. IDS ._~ BENT/SALT ~.0 / 0.1 DRILLED ~ BARITE -,'I,O~.,T. CLb/l:iot) , _ _ SPN #1 _ ~ SPN 12 70 TOT SPN I/,0 PRESSU~ ?~0 TOT GPl4 600 ANN VEl DP DC C:RZT I 1 17.$00 GTX-~ L"lt~r 20 ~0 20 29Z[ ~,.O0 73.001 :527 : ,.. · . , --- , i i 1 JV: ~ BZT Pg.E$-~URE Dlll)t." :~&S.~! l:ml BiT #P: 121.0.S BiT HP/lr~.: 0.503 Ii .... L · L I I I ROTATING STRING UT. ~ BNA UT. IN HUD; RP#: 80 - SLADC QFF UT. ~ bl~; ~ - 10 PICX UP ',IT'. ~,0 TQImJE: &GO iij~__~[T: :?',Gl~i' ~ ~.i~:.~v:.'.:., ..::.......:.~:~.!.:.:.:!..!:~.:...~:.:?.~!:.:::..:~.~::~::...i.~p~RA.~.T~N$.!~.~[N!~.~iEQUENc~i~:`:.~: ,,,:. ¥::i,:i,i!:i':~;i:::,,:,,,:!,,,,!'.i:i:~..:,~i:¥,ii;':-:,',.:,i!:,(.',:',!',,.!: '.',,:.¥,..':,.',,, 06:00 iO&..O0 ACCEPTI~O RIG FR(~I,I I, IO~ILIZATION AT 0600 HRS. 2-25-96. HIXF~D SPUO~. .O FU! RIG BACIC O# !(~ mATE DUE TO EI.I~CTRICAL PROBLEHS. AT 2/)00 HRS, 06:00 16:30 10.50 CORRECT ~_RX_C,~_P...K)8, L,EHS TO ~ PUHPS AND ROTARY TABLE. FIXED RIG P OT GAS ,AND #'-)S DETECTORS. 16.-]0 16..~o .... ACCEPTED R[G ~.CIN ~LZZATION AT 1630 HRS. -2c~6-_96. _ P OT 16'.~50 17:001 O.~O' p~n~/ I~ELI~Y. TAGGEO BOTTO/4 AT ]5', , , P OT 17:00 02:00 9.00 SPUDDED UELL AT 1700 HRS~ 2-26-g6. DRILLED ~rRl~ :55' T~ :527'. APT ~ p DC #~S. CCC]IITRQLLED DR/J. LED AND_CIRCULATED_BEFORE EACH CONNECTION~) ~..oojoi:oo ~.oo CIRCULATE HOLE CLEAN I~ 03:00!O&.'IO 1.$0 HADE SHORT TRIP TO SHOE ¢111'). I~0 FILL. I~ TR C)&:30 OS:OD O.SO PUMPED NUT P~.LIG CALIPER. CTRC HOLE CLEAN. !) C~ _O~..-O0,,p~.'..O0 ,,.'L.,D,O, ~ p TR : ,.... : ~= ..... ,-,,,.. , -., i i · ..-, . ' ~....~. -. , ........ : :, "~'.:~ ......... :':'~:'" !"'"'"'"' ::: ' ~i ........ ii! ~..:~' ~.i" ':i ?; : ~ ~ ,i,i i. I.,I ,~". ..... ~1. !?.'I."'. ~'.t', ' I..~ '!"i'1 ~,'' :'~ ...... '" .... "" ;"" '1, ,',i'*,li'i~ ,il iii .,, ,.. .. , .,, ,. ........ DOM DNIqqlM~ dHS MUZO:80 96, ZE ~3H r- DATE: 0212,7 DATE Of LAST BOP TEST: RARtTE 914 Used CKT. NEAT Used On. BLEND Used DRILL WATER Used â–º0T WATER Used F EL used -------------- SAC[CROUMD GAS to CONNECTION GAS to TRIP GS _ to _ MAX. iAS SLOW PUMP RATES TAKEN 2 ft. pLW No. 1 SRCP 2 _ SPM SRCP N — SPM PUMP NO. 2 0-1N9 G — SPH SKCP B — SPM SIDLE OEM: __ PORE PRESS:, ANCHOR TENSIONS (TOOL LDe) 1._ 2._ S. A. 7. O. BALL JOINT ANGLE OFFSET DIRECTION ACCIDENTS REPORTED LAST 24 HOURS: YES NAME OF INJURED DENNIS TWA1T EMPLOYER -DOOR â–ºRGT.a.._.,,. 1� -- SOCIAL SEC. NO. TIME OF ACCIDENT: T5:3O RIG 122D CONTRACTOR DON(TIME— CUM WIND DIRECTION: VELOCITT — _ WAVE DIRECTION i HT. — ROLL WAVE PERIOD HEAVE __ PITON HAND. HEADING VOL _ PERSOMNEL DATA: ROC 1 POOL NI 1 EPOCH TOTAL: 30 RLX 2 WEATHERFORD DOUELL 4 DESCRIPTION OF ACCIDENT: HOLDING BACKUP N N70P�96 M1T LLEFT LEG FE2 STATUS OF INJURED: WORKING HOURS ON MOTOR: SER NO. HUMS ON JARS: SEN NO. HOURS ON DC. 9.0 HOURS ON NEVI WT: DOW 9NI-nidd dHS WU80:80 96, GZ Had DIRECTIONAL '.DATA CONFIDENTIAL TIGHT HOLE .~t,l.i~l,~-~. Oil! .~:':~ ~,.'., .. ;~: ........... (k.~'~: ff'.f;~'.;!~; MARATH 0N' 0il Comp any Corea Creek Federal ***C onfidenti al*** Kenai Peninsula, Alaska Rig: Pool ~,122D , 1000 2000 3000 4000 5000 6000 7000 8000 9000 10000 DAYS CAHING HUD IBIGKT II'LOW RA~L'B SPP ROTARY RPM WOB ROP BIT ERS .... .o~^~.'~ D^~ '~ ~' :o ' .... ' ....................... , 13 3/8 -, ~ , t T~ DA~ ' , ; ~ 12 1/4 I _,[ ........ I,I I I I I I I I I i , ~ i~ ,, I - i I I I ' ' I I I - I I II ~ " t ,,, -- I I I "~ I I I .... i .... ~ ~ ~ ~ ~ ' " ~ -- C~( ' t II I ~ I ! ' ; c~ I II ] L ~ . I I ~ I I I I I I I I ' t . I I ] ~ , i I - ~ " I , ,, L I ~~ I ~~f ~ -- ~ '1 I I ; t j ' I ,, C~ '", ' '"""'' " ' ' '' " i I I , i ' , ,, ~ ~/~ i i c~ ' "~ I I '~ 0.0 10.0 20.0 30.0 0450-75539 40.0 50.0 ::, i ~'~"/ '-'~ 9 ~"',.'a --:i ~' (ppg) (gpm) (x 1000 psi) (rpm) (x 1000 lb,) (fVhr) (hr'B) W~'~:~~ ,, ~~:~~~~~~ MARATHON 0il Company ~'~~~"~ ~0~-~ Corea Cree~,: Federal ~1 Keuai Peninsula, Alaska ***Confidential*** Rig: Pool ~122D HORIZONTAL DEPARTURE IHCLINATION "' AZIMUTH · DOGLEG DRLUNO UODE BI-IA 1000 2000 3000 4000 -- 5000 -- 6O00 - 7000 eooo {- 9000 .'-- 10000 0 1000 2000 3000 4000 5000 6000-' 7000 8000 9000 10000 (feet) ~',,, iJ,'.i '::': 'L" .... : O450-75539 (dgs/lOOff) R DEPTI-! t MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission TO: THRU: FROM' David Johnst/on, Chairma~ Blair Wondzel~.;~';? ~- P. I. Superv~sor.f~-v-~ Lou Grimaldi,/~ ~ Petroleum Inspe~{or DATE: April 10, 1996 FILE NO: SUBJECT: A98JDJDD.DOC BOPE Test Pool rig #122 Corea Creek Federal #1 Marathon Oil Co. PTD #95-123 Wednesday, April 10, 1996' I witnessed the initial BOPE test on Pool rig #122 which was drilling Marathon well Corea Creek Federal #1 in the Ninilchik area The rig was close to testing when I arrived. I toured the area surrounding the rig and found it to be kept clean and orderly and for the most part impact from this drilling operation has been kept to a minimum. The test once started went very well. The test plug gave some problems seating in the new casing head and took a few tries to get it to seal. I observed proper test procedure which insured all BOP equipment exhibited its worthiness. The rig was preparing to make a cleanout run and do a bond log on the 7", and a completion will be run. The rig will be stacked and the well will be perforated afterwards. A inspection of the test equipment, if used, should be made. SUMMARY: I witnessed the weekly test of the BOPE on Pool rig #122 drilling Marathon well Corea Creek Federal #1. There were no failures observed. Test time 3 hours. Attachments: A98JDJDD.XLS CC: Mark Sinclair (Marathon Oil drilling Supt.) STATE OF ALASKA OIL AND GAS CONSERVATION COMMISSION BOPE Test Report OPERATION: Drlg: X Workover: Drlg Contractor: Pool Operator: Marathon Well Name: Corea Creek Federal #1 Casing Size: 13 3/8 Set @ Test: Initial X' Weekly Rig No. 122 PTD # Rep.: Rig Rep.: 2, 563 Location: Sec. Other DATE: 4/10/96 95-123 Rig Ph.# 227-0421 Lance Lamens Gary Goerlich 12 T. 1N R. 13W Meridian Seward TEST DATA Test Pressure P/F 250/5,000 MISC. INSPECTIONS: Location Gen.: P , Housekeeping: P (Gen) PTD On Location P Standing Order Posted P Well Sign P Drl. Rig P Hazard Sec. P FLOOR SAFETY VALVES: Upper Kelly / IBOP Lower Kelly / IBOP Ball Type Inside BOP Quan. 250/5,000 250/5,000 250/5,000 P BOP STACK: Quan. Annular Preventer 1 Pipe Rams 1 Lower Pipe Rams 1 Blind Rams 1 Choke Ln. Valves HCR Valves Kill Line Valves Check Valve Test Press. 250/2500 250/5,000 250/5,000 250/5,000 250/5,000 P/F P P P P P 1 2 250/5,000 P I 250/5,000 P N/A 250/5,000 N/A MUD SYSTEM: Visual Alarm Trip Tank P P Pit Level Indicators P P Flow Indicator P P Meth Gas Detector P P H2S Gas Detector P P CHOKE MANIFOLD: No. Valves No. Flanges Manual Chokes Hydraulic Chokes Test Pressure P/F 15 250/5,000 F 34 250/5, 000 P 1 P Func~oned FuncEoned P ACCUMULATOR SYSTEM: System Pressure Pressure After Closure 200 psi Attained After Closure System Pressure Attained Blind Switch Covers: Master: Nitgn. Btl's: Six Bottles 3,000 P 1,800 P minutes 25 sec. minutes 55 sec. P Remote: P 2100 Average Psig. ' ~=i ::ii L,d: "=,":,i::: ; ~= :"', ,,h: ", ~;:,, ;:,~' ,'~,,' ' ' ; :: ' ' ' ' Number of Failures: 0 ,Test Time: 3.0 Hours. Number of valves tested '/9 Repair or Replacement of Failed Equipment will be made within N/A days. Notify the Inspector and follow with Written or Faxed verification to the AOGCC Commission Office at: Fax No. 276-7542 Inspector North Slope Pager No. 659-3607 or 3687 If your call is not returned by the inspector within 12 hours please contact the P. I. Supervisor at 279-1433 REMARKS: Good test. Rig will be completing weft and leave it unperforated. Notify AOGCC when testing equipment is moved on location. Distribution: orig-Well File c - Oper./Rig c - Database c - Trip Rpt File c- Inspector STATE WITNESS REQUIRED? YES NO X 24 HOUR NOTICE GIVEN YES X' NO Waived By: Witnessed By: Lou Grimaldi FI-021L (Rev. 12/94) A98J DJDD.XLS Marathon Oil Company March 18, 1996 RECEIVED MAR 1 9 1996 Alaska 0il & Gas Cons. Commission Anchorage Mr. Dave Johnston Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501-3192 Reference: Corea Creek Federal #1 ~ ~) Testing Program - Alaska" ,q Domestic, ,oduction P.O. Box 196168 Anchorage, AK 99519-6168 Telephone 907/561-5311 Dear Mr. Johnston: In the Permit to Drill Application for the referenced well, Marathon reported its intention to test the well. Plans are to run casing at TD and complete the well with 3-1/2" tubing and packer. The testing program will be accomplished through tubing utilizing portable test equipment. Any produced gas will be flared. Approximately fifteen days of testing is expected, although actual testing time will be contingent on the number of intervals encountered and test results. This letter is to inform the Commission of Marathon's plans and to determine if there are any other reporting requirements. Sincerely, T. J.'-Kovacevich Operations Superintendent /nr~ H:\WP\OPNS96\MFS3181 A subsidiary of USX Corporation Environmentally aware for the long run. MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission TO: David Johns..Q~~,, DATE: Chairman ,_~.~'- March 19, 1996 THRU: Blair Wondzell, -~- FILE NO: P. I. Supervisor Petroleum Inspector Q98JCSDD.DOC Rig BOPE inspection Pool Arctic rig #122 Corea Creek Federal #1 Marathon Oil Co. PTD # 95-123 Tuesday, March 19, 1996: I traveled to Marathon's Corea Creek Federal #1 to make a Rig BOPE inspection on Pool Arctic rig #122. The rig was circulating at the shoe when I arrived. Pool's electrician was adjusting the load shed on the rigs SCR drives in advance of the bottom hole drilling portion of this well. The rig and its BOPE equipment appeared to be in good shape and some housekeeping was being accomplished. The location surrounding the rig was being kept very clean. Access to the rig was good. SUMMARY: i made a Rig/BOPE inspection on Pool Arctic rig #122 drilling Marathon's Corea Creek Federal #1. I found all equipment in compliance ,cc: Mark Sinclair (Marathon drilling supt.) ,Attachments: Q98JCSDD.XLS ALASKA OIL AND GAS CONSERVATION COMMISSION RIG I BPS INSPECTION REPORT OPERATION: Drig Contr: Operator: Location: Drilling X Workover Pool Arctic Marathon Section 12 T. 1 N Cmpl. UlC DATE: 3/19/96 Well Name Corea Creek Federal #1 PTD~ 95-123 Rig No. 122 Rep. Gary Goedich Rep. Pete Ber~la Rig Ph.# 227-0421 R. 13W M. S INSPECTION ITE:MS (A.) B.O.P. STACK Wellhead fig wkg press Stack wkg press Annular preventer Pipe rams Blind rams Stack anchored Chke/kill line size All turns targeted ( chke & kill Ln.) HCR valves (chke & kill Ln.) Manual valves (chke & kill Ln.) Connections (Flgd, Whd, Clamped Drilling spool Flow Nipple Flow monitor Control lines fire protected (B.) CLOSING UNIT Working pressure Fluid level Operating pressure Pressure gauges Sufficient valves Regulator bypass 4-way valves (actuators) Blind rams handle cover Driller control panel Remote control panel Firewall Nitrogen power source (backup) Condition (leaks, hoses, ect.) REMARKS: .IN COMPUANCE INSPECTION ITEMS MUD SYSTEM Pit level floats installed Flow rate sensor Mud gas separator Degasser Separator bypass Gas sensors line connections Trip tank (D.) RIG FLOOR Kelly cocks (upper, lower, IBOP) Floor valves (dart, ball, ect.) Kelly & floor valve wrenches Drillers console (flow monitor, flow rate indicator, pit level indicators, gauges) Kill sheet up-to-date Gas detection monitors (H2S & methane) Hydraulic choke panel~ :Choke manifold (E.) MISC. EQUIPMENT Flare/vent line All turns targeted downstream choke lines) Reserve pit tankage Personnel protective equip, avail. All Drillsite Supervisors Trained For Procedures H2S probes Rig housekee )lng Location clean and neat RECORDS: Date of Last Rig / BPS Inspection Date of Last BOP Test Resulting Non-Compliance Items: Non-Compliance not corrected & Reason: Date Corrections Will Be Completed: BOP Test & Results Properly Entered On Daily Record? OK 3/14/96 Kill Sheet Current? OK Distribution: orig - Well File c - Oper./Rig c - Database c -Trip Rpt File c - Inspector AOGCC REP: OPERATOR REP: FI-022 (Rev. 3/93) Louis R Grimaldi Pete Ber~la Q98JCSDD.XLS MEMORANDUM TO: THRU: State of Alaska Alaska Oil and Gas Conservation Commission DATE: March 7, 1996 Blair Wondzell, ~ P. I. Supervisor FROM: Lou Grimaidi, ~,~ SUBJECT: Petroleum Inspector FILE NO: A98JCGDD.DOC BOPE Test Pool rig #122 Corea Creek Federal #1 Marathon Oil Co. PTD #95-123 Thursday, March 7, '1996: I witnessed the initial BOPE test on Pool rig #122 which was drilling Marathon well Corea Creek Federal #1 in the Ninilchik area I arrived early for the test and observed a large portion of the rigup. The test once started, went fairly well. There were three failures observed, These being the floor safety valve which was stuck in the open position, The upper Kelly valve which leaked internally and a blind flange on the side outlet of the Blind rams. All failures were remedied during the test. Joe Russell (BLM inspector) was in attendance for this test. SUMMARY: I witnessed the initial test of the BOPE on Pool rig #122 drilling Marathon well Corea Creek Federal #1. There were three failures observed. Test time 4.5 hours. Attachments: A98JCGDD.XLS CC: Mark Sinclair (Marathon Oil drilling Supt.) STATE OF ALASKA OIL AND GAS CONSERVATION COMMISSION BOPE Test Report OPERATION: Drlg: X Workover: Drlg Contractor: Pool Operator: Marathon Well Name: Corea Creek Federal #1 Casing Size: 13 3/8 Set @ Test: Initial X Weekly Rig No. 122 PTD # 95-123 Rep.: Rig Rep.: 2,563 Location: Sec. 12 t. Other DATE: 3/7/96 Rig Ph.# 227-0421 Lance Lamens Holly Waldren 1N R. 13W Meridian Seward TEST DATA MISC. INSPECTIONS: Location Gen.: P Housekeeping: P (Gen) PTD On Location P Standing Order Posted P Well Sign P DrI. Rig P Hazard Sec. P FLOOR SAFETY VALVES: Upper Kelly / IBOP Lower Kelly / IBOP Ball Type Inside BOP Test Quan. Pressure P/F 1 250/5, 000 F I 250/5, 000 P I 250/5,000 F 1 P 250/5,000 BOP STACK: Annular Preventer Pipe Rams Lower Pipe Rams Blind Rams Choke Ln. Valves HCR Valves Kill Line Valves Check Valve Quan. Test Press. P/F 1 250/2500. P I 250/5,000 P 1 250/5,000 P 1 250/5,000 P 1 250/5, 000 P 2 250/5,000 P 1 250/5,000 P N/A 250/5, 000 N/A MUD SYSTEM: Visual Alarm Trip Tank P P Pit Level Indicators P P Flow Indicator P P Meth Gas Detector P P H2S Gas Detector P P CHOKE MANIFOLD: No. Valves No. Flanges Manual Chokes Hydraulic Chokes 15 Test Pressure P/F 250/5,000 F 34 25O/5, 000 P Functioned Functioned ACCUMULATOR SYSTEM: System Pressure Pressure After Closure 200 psi Attained After Closure System Pressure Attained Blind Switch Covers: Master: Nitgn. Btl's: Six Bottles 3,000 P 1,800 P minutes 27 sec. minutes 45 sec. Remote: P 2100 Average Psig. Number of Failures: ,Test Time:.__ Iours. Number of valves tested 21 Repair or Replacement of Failed Equipment will be made N/A Notify the Inspector and follow with Written or Faxed verification to the AOGCC Commission Office at: Fax No. 276-7542 Inspector North Slope Pager No. 659-3607 or 3687 If your call is not returned by the inspector within 12 hours please contact the P. I. Supervisor at 279-1433 REMARKS: Floor Safety valve would not close, oiled and steamed. Upper Kelly valve failed, cycled and retested "OK". Blind flange on Blind rams side outlet leaked, tightened and retested "OK. Slight hyd. leaks on accumulater repair at first oppurtunity. Joe Russefl (BLM inspector) also in attendence. Distribution: orig-Well File c- Oper./Rig c- Database c - Trip Rpt File c- Inspector STATE WITNESS REQUIRED? YES X NO 24 HOUR NOTICE GIVEN YES X NO Waived By: Witnessed By: Lou Grimaldi FI-021L (Rev. 12/94) A98JCGDD.XLS Domesdc, ,oduction Marathon Oil Company P.O. Box 196168 Anchorage, AK 99519-6168 Telephone 907/561-5311 March 1, 1996 Mr. Bob Crandell Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501-3192 Reference: Corea Creek Federal Cf1 H2S Measure Dear Bob: This letter is to confirm our conversation of February 29, 1996. The data from wells offsetting the referenced well was reviewed and it was determined that there was no reason to suspect that the referenced well would encounter H2S. Therefore, as we discussed, Marathon is relieved from complying with the H2S measures while drilling the referenced well. i F!L.E Sincerely, M. F. Sinclair Drilling Superintendent /nr8 H:\WP\DRILI.ge\MFS31 A subsidiary of USX Corporation Environmentally aware for the long run. MEMORANDUM TO: THRU: David ~n~ Chairrfi~ Blair Wondzell, P. I. Supervisor State of Alaska Alaska Oil and Gas Conservation Commission DATE: February 29, 1996 FILE NO: E98JB2DD.DOC FROM' Lou Grimaldi,'~'~ ~.~. SUBJECT: Petroleum Inspect(~r Diverter Inspection Pool rig #122 Corea Creek Federal #1 Marathon Oil Co. PTD #95-123 Thursday, February 29, 1996: I witnessed the function test of the new Diverter system on Pool rig #122 which was preparing to drill Marathon well Coma Creek Federal #1 in the Ninilchik area The 10" bifurcated vent line had been laid out and extended 108' from the well and 98' from the closest point of the sub-base on the straight run. The line was not anchored yet as they were still rigging up. The vent line rested on stacked dunnage, I had them chain the line down and stacked foul' pallets of mud at two points over the chains. The Vent line headed towards the North and gave good down wind protection. The 13 5/8 annular preventer functioned properly with a good closure time of 42 seconds. The 10" Knife valve operated quickly and was open well before the annular closed. I found no problems with the accumulator set other than a slight hydraulic leak on the manifold. I spent a long time on this inspection partly due to the weather and the rigs inexperience with rigging up a Diverter system. The ama surrounding the rig was neat, clean and well organized. SUMMARY: I witnessed the function test of the Diverter system on Pool'rig #122 drilling Marathon well Coma Creek Federal #1. Attachments: E98JB2DD.XLS CC: Mark Sinclair (Marathon Oil drilling Supt.) Drlg Contractor: Operator: Well Name: Location: Sec. STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION Diverter Systems Inspection Report POOL Arctic Marathon Oil Co. Corea Creek Federal #1 12 T. 1N R. Date: 2/29/96 Operation: Rig No. Oper. Rep.: Rig Rep.: 13W Development Exploratory: 122 PTD # 95-123 Rig Ph. # Pete Verga X 227-0421 Gary Goerlich Merdian Seward TEST DATA MISC. INSPECTIONS: Location Gen.: P Well Sign: Housekeeping: P (Gen.) Drlg. Rig: Reserve Pit: N~, Flare Pit: DIVERTER SYSTEM INSPECTION: Diverter Size: Divert Valve(s) Full Opening: P Valve(s) Auto & Simultaneous: P Vent Line(s) Size: 10 -' Vent Line(s) Length: 108" Line(s) Bifurcated: P Line(s) Down Wind: P Line(s) Anchored: P Turns Targeted / Long Radius: N/A 13 5/8 P P N~ in. in, ACCUMULATOR SYSTEM: Systems Pressure: Pressure After Closure: 200 psi Attained After Closure: Systems Pressure Attained: Nitrogen Bottles: 2950 psig 2000 psig 0 min. 30 sec. 1 min. 42 sec. Six 'Bottles 2050 psig MUD SYSTEM INSPECTION: Trip Tank: Mud Pits: Flow Monitor: Light Alarm P P P P P P Light Alarm P P P P GAS DETECTORS: Methane Hydrogen Sulfide: Valve ] 98' North ..... ~ Wind / Non Compliance Items Remarks: None Repair Items Within N/A Day (s) And contact the Inspector @ 659-3607 Distribution orig, - Well File c - Oper/Rep c - Database c - Trip Rpt File c - Inspector AOGCC REP.: OPERATOR REP.: E98JB2DD,XLS Louis R. Orimaldi DVTRINSP,XLT (REV. 1/94) ALASKA OIL AND GAS CONSERVATION COMMISSION TONY KNOWLE$, GOVERNOR 3001 PQRCUPINE DRIVE ANCHORAGE, ALASKA 99501 -,3192 PHONE: (907) 279-1433 FAX: (907) 276-7542 February 23, 1996 Mark F. Sinclair Drilling Superintendent Marathon Oil Company P O Box 196168 Anchorage, AK 99519-6168 Re: Well # Company Permit # Surf Loc Btmhole Loc Dear Mr. Sinclair: Corea Creek Federal #1 Revised Marathon Oil Company 95-123 1567'FSL, 1573' FEL, Sec 12, T01N, R13W, SM 1600'FNL, 1600' FWL, Sec 12, T01N, R13W, SM at 9000'TVD Enclosed is the approved revised application for permit to drill the above referenced well. The provisions of the original approved permit dated November 13, 1995 are in effect for this · . c: Dept of Fish & Game, Habitat Section - w/o end Dept of Environmental Conservation - w/o encl .non Oil Company ; 2-23-96 ;11'45A1~1 ; , Anchorage-, STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS 907 276 7542;# 2/ 2 O:.~EXCEL~CC F1 AaA2XL~ 1. Type of Request: Abandon Alter Casing Change Approved Program X -- 2. Name of OF~.~r MARATHON OIL COMPANY .-- r :.:_ - - 3. Acl~m P. O. Box 196168, Anohora~.,:,AK 9951~-6108 4. Location of Well at Surface Sulq:~end __ Repair Well_._ Pull Tubing ..... I'' ,;'. Type of Wedl; Development__ ~tratigraphic__ Service__ Operation Shutdown Re-enter Suspended Well Plugging__ Tm'm Extension Stimulate Variance Perforate Other 1567' FSL & 1~i73' FEL SEC 12 T1N R13W S.M. At top of Productive Interval 295T FSL & 2959' FEL SEC 12 T1N R13W S,M, AT 5208' TVD ORIGINAL 1600' FNL & 1t~00 FWL SEC 12 T1N R13W $.M. AT BO00' T At Total Depth . 1800' FNL & JSO0 FWL SEC 12 T1N R13W S,M. AT 9000' TVD 12. Present Well Condition Summary 8. Datum Elevation (DF ~ KB) EST I~ 280 7. Unit or Property Name COREA CREEK FEDERAL .. a. Well Number COREA CREEK FEDERAL #1 e. Permit Number 95.123 10. APl Number 50- 133-20467 It. Field/Pool WILDCAT/TYONEK NOT SPUDDED, ESTIMATED SPUD DATE IS FEBRUARY 24, 1996 Total Depth: measured ~ Plugs (measured) true vertical feet Effective Oepth: measured feet Junk (measured) true vertical feet S~ruciural Oondu~or Surfa=e Intermediate Proou~tlon Uner Perforation D~th; measured true vertical Length Size Cemented Measured Depth True Vertical Oepth Tubing (size, grade, and measured depth) Peckera and SSSV (type and measured depth) 14. Estlr,~a~ed Date for Commencing'~p~]t'iO-n ..... 10. If Pr01x~al was Verbally Approved 13. Attachmeras Desorlption Summary ~o~ Pmp-0sal_~X i Name of Approver Date Approved I OI1~ ~ 7. I hereby ~rtify that the foregoing iS true and ~otreet to the beat of my knowledge. Alaska Oil & Gas Cons. Commissio~ . Anchorags Detailed Operations Pregram__ BOP Sketch Status Of Welt Cl~;~i~-mation as: Gas X Suspended Service FOR COMMISSION USE ONLY Titre DRILLING SUPERINTENDENT Conditions of Approval: Notify Commission so representative may witness Plug Integrity. BOP Test Looalion Clearance Mechanical Integrity Test__ -~ubsequent Form Required 10-'*""-'/t~.~ '"/' Original Signed By David W. Johnston Approved by Order of the Commission F-or,,m 10.403 Rev. 08/I 6/88 Date 212311 ~ IApproval No./.~, _ ~ .................... R~tur~ed _. .= _ Commissioner Date ' S~ml~ In ~Plioate' Company ; 2-28-96 ;10:14A1~1 Anchorago~ 907 276 7542;# 3/ 9 COREA CREEK FEDERAL #1 MARATHON RECENTLY GAINED ACCESS TO ADDITIONAL GEOPHYSICAL INFORMATION THAT IMPACTS THE OPTIMAL LOCATION FOR THE SUBJECT WELL. BASED ON THE REVISED STRUCTURAL INTERPRETATION, MARATHON PROPOSES TO DIRECTIONALLY DRILL A "S" SHAPED WELL WITH A TOTAL DISPLACEMENT AT TD OF APPORIMATELY 3000'. THE REVISED TARGETS OF THE WELL ARE AS FOLLOWS: SURFACE LOCATION: INTERMEDIATE TAGETS: AT 5208' TVD AT 8000' TVD 1567' FSL & 1573' FEL OF SECTION 12 T1N R13W SM 2957' FSL & 2959' FEL OF SECTION 12 T1N R13W SM 1600' FNL & 1600' FWL OF SECTION t2 T1N R13W SM PROPOSED BOTTOM HOLE LOCATION: AT 9000' TVD 1600' FNL & 1600' FWL OF SECTION 12 TIN R13W SM THE DIRECTIONAL PLAN 18 SUCH THAT THE ENTIRE WELL BORE WILL BE WITHIN STANDARD SPACING REQUIREMENTS FOR AN EXPLORATORY GAS WELL, DIRECTIONAL PLAN: NORTH WEST VERTICAL MD TVD INCL AZIM COORD COORD SECTION RKB 0' 0' 0 0 O' 0' 0' KICKOFF POINT 1199' '1'199' o 0 0' o' 0' END OF BUILD 2400' 2346' 30.03 315.08 218' 217' 308' END OF HOLD 6723' 6088' 30.03 315.08 1750' 1745' 2471' END OF DROP 8725' 8000' 0 0 2113' 2107' 2984' PROPOSED TD 9725' 9000' 0 0 2113' 2107' 2984' A PLAT AND DETAILED DIRECTIONAL LISTING ARE ATTACHED. .non 0tl Company ; 2-23-96 ;10'15t1~I ; Anchorage~ 907 276 7542;# 4/ 9 4§0 0 1350 180( 2250_ - 2700= _ 3150_ I k.= (:],) 4500. >. - }.._ - 5850_ 6.300 _ 6750 .~ 7200 ,~ 7650 _ -- 8100_ MARATHON 0il Company WBII : CC'~jil 6550_ - ~50.. KOP 2.50 5.00 In. Oo 15.00 17,50 20.00 2Z JO 25,00 ~7,50 ..... Point KOP End ~ Bund /nd of Hold End ~' Drop lgrq~f ~- ~ 5/8 CSO~t 2200 I [ .... I rlMd ; [.~plor~ilon Clam OuUch, Alike WELL PROFILE ~D Inc Dlr D ~nn 315,08 1199 o.oo ~1~.08 2400 30.03 315,0~ 6723 30,03 31&.0~ 6725 O.O0 ~15.08 .~=~.. oeo ..al.~n, 2000 1800 1600 I I I ,_1, J DATA ~ NorU1 Eoat I:)eg,/lO0 o o o o,oo 1199 o o 2~4~ 218 --217 2,50 EOBB 1750 -17~5 0,00 8000 2113 -2107 1,50 gOOD .... ~!.~.._ I~,,gin Angle Drop TA~CLW <-- Wesf 14OO I;~30 1oo(3 sO0 G00 I I .I ...... L, I t I I ,I..~..[ 27.00 24.00 I 6,00 13.~ 10,50 7,50 ~.00 1.50 End ~91e L~raf~ L~/7 CSGPt I I ~ "I'`-I I I I f ...... [ [ I I I "T' r 0 450 gO0 1350 1800 2250 2700 31~$0 , 5c01e 1 ' 100.00 40O 200 0 I I I .... I,_ I FEB 2 3 1996 ~aska Oil & Gas Cons. Commission Anchorage 200 ! _2.200 - .2000 _ 1600 -- - _ 1200 . .10o0 8oo 600 ,400 2o0 0 200 /X I ! Dote plotted : 22-Feb-g8 Plot R~emnce la Corse Ck r.~l Vets, ~1. Coe~inateg ore l~ feel, reference slot ~1. r~e venial ~pth~ are re~e~nnee ~Ka. .on Oil Company 2-23-06 ;IO'iSAM ; Anchorage-~ 907 276 7S42;# $/ 9 HARATHON ol L Company Cor~a Cra~k Faclera[ #I CCF#1 Exptoratton CLam Gu[tch, ALaska PROPOSAL LISTING BakeP Hughes INTEQ Your ref: corea ck FecWl Ver~. #1 Our ref = prop1237 License : Date printed: 22-Feb-96 Date created = 18-#ay-95 FieLd is centred on n60 48 21.994,w150 49 18.96{ Structure {e centred on n60 11S.328,w151 26 32.~88 stot location Is n6O 11 20.759,w151 27 stot Grid coordinates are N 22639&2,1070 E SLot Local coordjrmcee are 1567.00 N 1573.00 Reference North iS True North FEB 2 5 1996 Alaska Oil & Gas ~ns. Commissim~ Anchorage .non 0tl Company ; 2-23-96 ;10'15t~1 ; Anchor age-~ 907 276 7842;# 6/ 9 MARATI~Xl O~ t Ccx~mny Core~ C~I~Ic Federal #1,CCF#1 Exptoretton, Ci~m ~it~, Neatu~ I~tin. Az$~h Tr~Vert. R E C T A N G U L A R Dogl~ Vert Deg~ Degr~ Depth C 0 0 R D I N A T E $ Deg/lOOFt 0,00 0.~ 315,~ 0,00 0,00 N 0.00 500.00 0.~ ]13,~ 5~,~ 0.~ N 0.00 E 0,00 0,00 1000.00 0.~ 315.08 1~.00 0,~ N 0,~ E 0.~ 0,00 11~.7~ 0.00 ]15,08 11~,?4 0,00 N 0,00 1~.74 ~.50 ~5.~ 1~.71 1.54 N 1,54 W 2,50 ~.18 I~g8,74 5.00 ]15,~ 1~,4g 6,18 N 6.16 W 2.50 1498,74 ?.50 ]15.~ 149T,~ 1].~ N 1~.~ W 2,50 1598.?4 10,00 ]15,~ 15~.71 ~4.~ N Z4,58 W 2,50 1~,?4 12,50 315.~ 16~.~ ]8,47 N 38,~ W 2.50 1~,7~ 1S.00 31~,~ 1~1,91 ~.30 N SS.14 W 2,50 1M.T& 17,50 315.08 l~T,gl ~,11 N 7~.~ W ~.50 1~,T4 ~0.00 315.N 19~,59 97,8T N 9~,~9 W ~.~0 ~0~.74 ~,~0 ~15,~ 20~.78 123.5~ N 1~.1~ W ~,74 30.00 315,08 ~4,M ~1~,42 N 216.81 W ~,~0 3500.00 ~0.~ ~1S,08 32~.07 60T.?0 N ~,98 W 0,00 GO00,O0 30.03 315.~ 3~0,~ ~,90 N ~,67 g O.O0 4500.00 30,03 315,08 41~.8~ 96~.~ N ~9.~ V 0.00 5000,00 30.03 315,08 &5~,~ 1139.~ H 11~.06 0 0,00 ~$00.00 ]0,0~ ~15,~ $O]g.~7 1~16.~9 N 1~1~,~ W 0.00 ~,10 ~0.0] ]15.~ 52~.00 1~,~t N 1~85,50 ~ 0.00 6000,00 30,~ 315.~ ~461.4~ la93.~ N 1~89.~ ~ 0.00 6500,00 ~0.03 ]1~,08 ~,]l 1~T0.~ N 1~.14 W 0,00 6~,~ ~0.0~ ~1~,05 &~,]~ 17~9.~ ff 1~4~.91 W 0,00 6725,03 30,00 315,08 ~,14 1750.~ N 1745.~ U 1.50 ~,03 ~.50 315.~ 6177,39 1785.Z3 N 1780,16 W 1.50 6925,03 27.~ 315.~ ~65,M 1818,20 N 1813,~ ~ 1,50 ~ZS.~ ~,50 315,~ 635~,~7 1~9,51 N 1~4.26 g 1,50 71~5,03 Z4.00 315,~ ~.~ 1879,16 N 18~,~ ~ 1.50 TZZS,03 ~2.50 315.08 6538.26 1907,11 N 1901,~ ~ 1.50 ~Z5,03 21.00 315.~ ~1.IG 1~3.35 ~ 1927.~ ~ 1.50 7425.03 19,50 315.~ 6~4.95 1957,~ N 195~,30 W 1.50 ~Z5,03 18.00 315.~ ~19.~ 19~.6Z N 197A,~ ~ 1.50 76~5,03 16.50 315,08 ~15,1A 2001.62 ~ 1~,~ U 1.50 ~5.03 15.00 313,0~ ~11.~ ~020.~ H ~015.10~ 1.50 7825.~ 13.50 315.08 7108,30 2030,27 N 2032,~8 g 1.50 ~25.03 IZ,O0 315,08 7205.~ ~053,89 N ~fl.~ ~ 1.~0 ~Z5.03 10.50 315,~ ~03,91 2~7.71 N 2~1.~ W 1,50 8125.~ 9.00 315.~ 7~02,46 ZO~.~ N 20~.~ ~ 1,50 8225,03 7,50 315,08 ~01.63 2089.~ N ~0~,92 ~ 1,50 ~25,~ 6.00 315.~ 7~,~ Z0~.18 N 2092.22 M 1 ~25,03 4.50 315,~ ~,31 21~.~ N 2~8.~ W 1,50 ~25,03 3.~ 3~5.~ ~0.09 ~109.~ N 2103,30 , ~.50 ~5,~ 1.50 315,~ ~00.01 2~12.0~ N 2~.~ ~ 1,50 8~S.03 0,~ ~15.08 ~00,00 ~113.00 H Z107,00 ~ 1.50 90DO,M 0.00 315,~ 82t6,97 2113.00 N 2107.00 ~ 0.00 PROPOSAL LISTING Page 1 Your ref : Cores Ck FedS1 Ver~, #1 Last revised: 22-Feb-96 8,i'~ 19.61 3~.82 54,32 78.09 t06.07 138,21 174.46 250.95 1108,44 t358.68 1608.91 1859.15 1962.30 TARGET 2109,39 2359,63 2&71.20 Begtn AngLe Drop 2472.25 2521.11 2567,67 2~11,90 2655,76 27~0.29 FEB 2 3 1996 276~,90 2826.70 2853.~ 2578,4~ zgoo. $~asks Oil & Gas Cons. Commissior~ ;9ao.o3 ~omge E936.97 2951.32 ~78.76 ~982.~ ~83,~ E~ A~te 29~.~ ALL clots is in feet unless otherwise stated CoordlrmteB fram stat #1 and TVD fram RKB (100.00 Ft above mean sea LeveL), VertfcnL section is fram uetthead on azimuth 315.08 degrees. Dec[ in~t ion t s O. 00 degrees, COnvergence i$ - 1,25 degrees · Calcutatfon uses the mlnfmum curvature method, Presented by Baker Hughes INTECl .~on Oil Company ; 2-23-96 ;10'16A1~ ; ~" Anchorage~ 'i 907 276 7542;# 7/ 9 NARATHO# OIL c~er~ Corem Creek Federal #I,CC;F~I ExpLeretfon,CLmn Guttch, ALike PROPOSAL LISTING Page 2 Year re; : Corec Ck FedJl Verso #1 L~t rav~aed : 22-Feb-g6 #ee~ul~l IncLIn. Azimuth Trt~Vert. R E c T A # G U L & R Oogieg Vert Depth Degreee Degr~ Depth C 0 0 R D I N A T [ $ Deg/l'OOFt Sect 9500.00 0,00 315,08 87'74.9'7 97'25.03 0o00 315.~ 9000.00 2111.00 N 2TO7.0(iV 0.00 2963.90 Zl13.00 # 2107.00W 0.00 Z9~.99 TD / 1ii CSG Pt FEB 2. 3 1996 Alaska Oil & Gas Cons. CommJssio~.~ Anchorage ALL date ;s in feet unless otherwise stated Coordlnete9 from sLot #1 and TVD from RgB (100.00 Ft above,eon see LeveL). Vertical sect;on fs from ueLLhead on azimuth $15.08 degreea. DecLination is O,OOdegrees, Convergence is -1'.25 degreee. cetcuLat;enuses the minim~ncurvaturemethod. Presented by Baker Hughes INTEQ .non Oil Company ;2-2~-96 ;10:16.,~1; Anchorage~, 907 276 7542;# 8/ 9 NARATHOll 011 Company Corea Creek F~leret #1,CCF#I Explorer ! on, C Lam PROPOSAL LISTING Page 1 Your ref : Cores Ck FedS1 YarD, #1 LBSt revloed: 22-Feb-96 14eaaured lncLSn, kzlauth T~ue Yert. R E C T A N G U L A R Dogleg Vert Depth Degrees Degrees Depth C 0 o it D I N A T E $ Deg/lOOFt Sect 0.00 0.00 315,08 0,00 15fi7,00N 1573,00 W 0.00 0,00 900,00 0.00 315.08 500,00 1567.00 N 1573.00 g 0.00 0.00 1000.00 O.O0 315,08 1000.00 1567,00 I~ 1573.00 g 0,00 O.O0 1198.74 0.00 315.08 1198.7& 1567,00 N 1573.00 g 0.00 0,00 KOP 129~.7& 2,50 315.08 1~N3,71 1568.54 N 1574,5& W 2,50 2.16 1398,7& 5,00 315.06 1398,49 1573.18 N 1579.16 W 2.50 8.~ 1498,7& 7,50 315.08 1497.88 1500.M N 1586.1~ 14 2.50 19.61 1598,7& 10,00 315.08 1596.71 1591.66 N 1597,58# 2.50 34.8Z 1698.74 12.50 315,08 169~.78 1608.47 ii 1611,3~ # 2.50 54.32 17~8.7& 15,60 315.08 1791,91 1622.30 N 1628,1& Y 2.50 78.09 1e98.74 17.50 319.08 1857.91 1642.11 N 16/,7.90V 2,50 106.07 1998.7& ~.00 315,08 1962,59 16~,87 # t6~.59 ~ ~.50 1~.21 2~,7& 22,50 315,~ 20~,78 1~,53 N 16~,18 Y 2,50 174.~ 21~,T4 25.00 315,~ 2167.31 1719,05 N 1~,fi2 Y 2,50 214.~ ~,74 27,50 315.~ Z~6.~ 1~0,37 H 1~5,85 g 2.50 258.95 2398.74 30.00 315,08 2344.66 178~,42 II 1789,81 g 2.50 307.05 2&00,00 30,03 315.~ ~45,~ 17~,87 N 1~0,25 Y 2.50 307,~ E~ - 9 5/8" CSG Pt Z5~,00 30.03 315.~ 2432.32 1820,31 H 1~5.59 Y 0.00 357,~ 30~,00 30,~ 315.08 2~5,~ 1~7.50 N 2~2,28 Y 0.00 607,96 3500.00 30.03 315.08 3~.07 ~17~,~ B ~1~.98 ~ 0,00 858,~0 4000,00 30,03 315.08 3730,95 2351.90 BI 2355.67Y O.OO 1108,44 4500,00 30,03 315.08 4163.82 2529.09 N 2532.36 y 0.00 1358.68 5000.00 30.03 :~15,08 4596.78 2706,Z9 N 2709.06 U O,O0 1608,91 5500,00 30.03 315.08 5029,57 2883.49 N 2865.75 g 0.00 1859.15 5706.10 30,03 315.C)8 5208,00 2956.52 Il 2958.56 W 0°08 1962.30 TARGET #1 6000,00 30.03 :315,08 5662.45 3060,68 N 3062.44 U 0.00 2109.39 65O0,00 30.03 315,08 5895.32 323~,88 N 3239.14 U 0,00 Z359,63 6722.93 30,03 315.08 6086,32 3316.a,s N 3317,91 v o.oo 2471.2o eegfn Angle Drop 6725.03 30,00 315.08 6090.14 3317.63 N 3318,~ 1.50 2~72.25 6825o03 26,$0 315.00 6177.39 3352,25 N 3353.16 V 1,50 2521oll 6925,03 27.00 315,08 6265.88 ~5,20N :3386,0314 1.50 2567,67 ?025.03 25.50 315,08 6355.57 3416,51 N ~17.26g 1,90 2611,90 7125,03 24,00 316.08, ~46,38 3(A6,16 N 3446.82 g 1.90 2653,76 7229.03 22.50 315.08 6538,26 ~74.11 , ::3474.n) U 1.50 2693.23 7325.03 2~.00 315,08 6631,1~ 3500.35 , 3500.86 ~ 1,50 2730.29 ?&25.0:3 19,50 315,08 6724,95 3524,86 # 3525,30 g 1.50 276~.90 7525,03 18.00 315,08 6819,6~ 3547,62 N 3547.99 Y 1,50 2797.04 7625.~S 16,50 315.08 6915,14 3568.62 N 3568,93 W 1,50 2826.70 7~5.03 15,00 315.08 7011.38 3587.84 N 3586.10g 1,50 ?,~3,8~ 78~5.03 13,50 319,08 7108,30 3605.27 N 3605,46 g 1.50 2678,&5 7925,03 12.00 315,08 7205.84 3620.89 N 3621.06 W 1,50 2900,52 8025,03 10,50 3t5.08 ~03,91 3634.71 N :3634.84# 1.50 2920.03 8125,03 9.00 315,08 7&O2,&6 36G6.7'0Ii 3~6,79 Y 1.50 2936,97 8225.03 7.50 315.08 7501,43 3656.86 , :~56,92 I~ 1.50 2951.32 8725.03 6.00 315,08 7600,73 3665.18 N 3665,22 Y 1,50 2963,07 FEB 2 5 1996 Alaska Oil & Gas Cons. Commission Anchorage 8~25.03 &.SO 315,08 ?~0,31 3671.~6 N 3671.68 y 1.50 8525.03 3.00 315,08 7800.~ 3676,~ N 3676.30 u 1.50 29~,76 ~.03 1,50 315.~ ~0,01 36~.07 N 36~,~ ~ 1,50 6~,03 0.00 315,~ ~00.~ ~,00 N 3~0.00 g 1,50 ~3,~ E~ ~gLe Drop ~.00 0.00 315.08 8274,97 3~.00 N ~.00 U 0.00 2~3.~ Att data 15 In feet' unless other,isa stated Coordinates fram SE Corner of s~, 12, T1N, R15~ a~ T~ rrm RKO (100,00 Ft a~e ~an sea Level). Vertical s~ti~ is fr~ ~lth~d ~ azi~th 315.08 ~re~. DecLi~ti~ is O. O0 ~gr~, C~verg~e is -1,25 degree8, Cat~Lati~ uses the m~nt~ curvat~e Preeent~ ~ Baker Hughes Oil Compan~ ; 2-2~-96 ;10:17A1~ ; : ', Anchorage~ 907 276 7~42;# 9/ 9 Cone~ Creek Federal #1,CCF#1 Exptoretlon,Cla~ G~Jitch, Aleeke PROIN3SAL LISTING Page 2 your rat : Corea Ck Fect~I Vets. #1 Lest revised: 22-Feb-~ He~ured IncLln. Azimuth True Vert. R E C T A N G U L A R Dogteg Vert Depth Deoree~ Degrees Depth r 0 0 R D ! N A T E $ Dcg/lOOFt Sect 9500.00 0,00 315.08 8T/%.97 9~5.03 0.00 315.08 9000.00 3(,80.00 N 5&l)O,O0 U 0.00 2983.99 ~l~OoO0 N ~80,00 H 0.00 Z98~.9~ TD ! 7~ CSG Pt Alt data Is in feet unless otherwise stated Ceerdinates fr~m SE Cormr of $~, 12, T1Nt R1]~ a~ T~ fr~ RKB (1~.00 Ft a~ ~en sea te~t). vertical section is fr~ Hettheed on azimth 315.08 d~roeo, D~tt~tl~ is 0.~ degrees, cmvergence is -1.25 degrees. ceLcutat~ u~oa the mJni~ eurveture mth~. Pres~t~ ~ Baker Hugh~ 1NTEG Alaska F~" .~ Domestic'l-,roduction Marathon Oil Company P.O. Box 196168 Anchorage, AK 99519-6168 Telephone 907/561-5311 January 30, 1996 Mr. Blair Wondzell Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501-3192 Reference: Corea Creek Federal #1 Dear Blair: Attached is an Alaska Oil and Gas Conservation Commission Application for Sundry Approval requesting a change to the casing program of the referenced well. You can contact me at 564-6450 if there are further questions. Sincerely, M. F. Sinclair Drilling Superintendent H:\WP\OPNS96\MFS1301 Attachment A subsidiary of USX Corporation Environmentally aware for the long run. STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS O:\EXCEL\CCF1 ASA1 .XLS 1. Type of Request: Abandon __ Suspend__ Operation Shutdown Re-enter Suspended Well Alter Casing __ Repair Well__ Plugging Time Extension__ Stimulate~ Change Approved Program X Pull Tubing Variance Perforate Other 2. Name of Operator MARATHON OIL COMPANY 3. Address P. O. Box 196168, Anchorage, AK 99519-6168 4. Location of Well at Surface 1500' FSL & 1500' FEL SEC 12 T1N R13W S.M. At top of Productive Interval SAME At Effective Depth SAME At Total Depth SAME 5. Type of Well: Development Exploratory X Stratigraphic Service ORIGINAL 12. Present Well Condition Summary Total Depth: measured true vertical NOT SPUDDED. ESTIMATED SPUD DATE IS MARCH 1, 1996 feet Plugs (measured) feet 6. Datum Elevation (DF or KB) EST KB 280 feet 7. Unit or Property Name COREA CREEK FEDERAL 8. Well Number COREA CREEK FEDERAL #1 9. Permit Number 95-123 10. APl Number 50- 133-20467 11. Field/Pool WlLDCAT/TYONEK Effective Depth: measured true vertical feet Junk (measured) feet Casing Structural Conductor Surface Intermediate Production Liner Perforation Depth: measured Length Size Cemented Measured Depth true vertical Tubing (size, grade, and measured depth) Packers and SSSV (type and measured depth) JAN 1 1996 Alaska Oil & Gas Cons. Cemmissio~ Anchorage True Vertical Depth 13. Attachments Description Summary of Proposal ~ Detailed Operations Program BOP Sketch 14. Estimated Date for Commencing Operation MARCH 1, 1996 16. If Proposal was Verbally Approved Name of Approver Date Approved 15. Status of Well Classification as: Oil Gas X Service Suspended 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. FOR COMMISSION USE ONLY Conditions of Approval: Notify Commission so representative may witness Date 1/26/1996 022_ Plug Integrity BOP Test Location Clearance Mechanical Integrity Test__ Subsequent Form Required 10- Approved by Order of the Commission Form 10-403 Rev. 06/15/88 /Approval No. Approvec~ Copy' Returned ...... :__ Commissioner Date ~"' ~::¢~/~ C(L Submit in Triplicate MARATHON OIL COMPANY (MOC) PROPOSES TO REVISE THE CASING PROGRAM FOR COREA CREEK FEDERAL WELL #1 AS FOLLOWS: OLD PROGRAM: 20", 133 PPF, K-55, PE @ 200' 13 3/8", 81 PPF, K-55, BTC @ 2500' 9 5/8", 47 PPF, N-80, BTC (~ 5100' 7", 29 PPF, N-80, BTC @ 9000' NEW PROGRAM: 20", 133 PPF, GRADE B, PE @ 80' 13 3/8", 81 PPF, K-55, BTC @ 300' 9 5/8", 43.5 PPF, L-80, LTC (~ 2500' 7", 29 PPF, N-80, BTC (~ 9000' THE ABOVE CHANGE IS BEING REQUESTED MAINLY TO INSURE PROTECTION OF THE BLUFF. THE SURFACE LOCATION OF THE WELL IS APPROXIMATELY 300' FROM THE BLUFF. THE ELEVATION OF THE BLUFF IS APPROXIMATELY 250'. UPON FURTHER REFLECTION, MOC CONSIDERS ATTEMPTING TO DRIVE 20" TO 200' IMPRACTICAL. ADDITIONALLY, THIS AMOUNT OF 20" WOULD NOT FULLY PROTECT THE BLUFF. THEREFORE, IN ORDER TO PROTECT AGAINST SEEPAGE TO THE BLUFF WHILE DRILLING SURFACE HOLE, MOC PROPOSES THE REVISED CASING PROGRAM. THE 13 3/8" AND 9 5/8" CASING STRINGS WILL BE CEMENTED BACK TO SURFACE. THE 7" CASING STRING WILL BE CEMENTED TO ABOVE THE TOP OF HYDROCARBON ZONES EXPECTED TO BE AT 3000'. THIS WILL ALLOW POSSIBLE ANNULAR INJECTION OF DRILLING WASTE, ON FUTURE WELLS OFF THIS PAD, BETWEEN 2500' AND 3000'. MOC WILL USE A DIVERTER ON TOP OF THE 13 3/8" CONDUCTOR STRING WHILE DRILLING TO 2500'. A DIVERTER WILL NOT BE USED TO DRILL BELOW THE 20" DRIVEPIPE TO 300'. THE 9 5/8" INTERMEDIATE STRING AT 5100' IN THE OLD PROGRAM WAS CONSIDERED A CONTINGENCY STRING. MOC DOES NOT ANTICIPATE THAT AN INTERMEDIATE STRING WILL BE REQUIRED. IF THE NEED FOR A INTERMEDIATE STRING ARISES, MOC WOULD PLAN TO SET 7" AND THEN SET A 5" LINER AT TD. JAN 1 1996 Alaska Oil & Gas Cons. Commission Anchorage TO: FROM: DATE: RE: Bob Crandall, Alaska Oil & Gas Conservation Commission David L. Brimberry, Exploitation Geologist, Marathon Oil Company,(,_J~x/ Anchorage November 7, 1995 EXPECTED PRESSURE GRADIENT ..rl~ MARATHON COREA CREEK FEDERAL #1 (CCF1) SEC. 12-T1 N-R13W PTD 9,000' KENAI PENINSULA BOROUGH, ALASKA Marathon expects to encounter pressure gradients not exceeding 0.5 psi/ft (Mud Weight equivalent- 9.6 #/gallon) while drilling the CCF1. Drilling operations will use mud weights at or below 10 #/gallon. Surrounding well data supports this expectation and plan. These nearby wells which have drilled the prospective stratigraphic section at comparable depths and with mud weights not exceeding 10.5 #/gallon ( pressure gradient- 0.52 psi/ft) recognized no overpressured section. Texaco Ninilchik #1, Sec. 22-TIN-R12W, 10-10.1 #/gallon, 1979 Marathon Clam Gulch l-X, Sec. 3-T1N-R13W, 10 #/gallon, 1968 Union Clam Gulch 1, Sec. 28-T2N-R12W, 9.5 #/gallon, 1979 Mobil Ninilchik 1, Sec. 24-TIN-R14W, 10-10.2 #/gallon, 1964 Socal Falls Creek 43-6, Sec, 6-TIN-R12W, 10.3 #/gallon, 1973 Socal Falls Creek 2, Sec. 23-T-1S-R13W, 10.7 #/gallon, 1966 Additionally, mudlog D-exponent data indicates a normal pressure gradient from surface to TD ( 10,877 TVD) in the Texaco Ninilchik #1. The Socal Falls Creek #1 (1961, CCF1 nearest offset), Sec. 6-TIN-R12W, and the Union Ninilchik 1(1962), Sec. 6-T1 S-R13W, drilled with higher mud weights; 10-12.8 #./gallon and 11.3-11.5 #/gallon, respectively. These wells were the first on the large Ninilchik structure. Drilling operations were, as expected, cautious. Subsequent production testing in the Falls Creek #1 identified a gradient of 0.45 psi/foot (8.6 #/gallon) in the prospective gas sands of the CCF1 ( Socal Falls Creek 1; 7350 TVD). This information shows that the mud weights were excessive for the drilled intervals. The limited seismic data across the CCF1 has no pressure anomaly signature. The limitations of the data do not allow a full interpretation for pressure anomalies; however, the well control satisfactorily evaluates the area for abnormal pressure and indicates none. xc: J.V. Miesse, Exploitation Manager, Marathon Oil Company, Anchorage M.F. Sinclair, Drilling Superintendent, Marathon Oil Company, Anchorage NOV 't $ i9'9,5 .0il .& Gas Cons, C0mm. issi0~ Anchorage TONY KNOWLE$, GOVERlVOi~ ALASKA OIL AND GAS CONSERVATION COMMISSION 3001 PORCUPINE DRIVE ANCHORAGE, ALASKA 99501-3'~92 PHONE: (907) 279-1433 FAX: (907) 276-7542 November 13, 1995 Mark F. Sinclair, Drilling Superintendent Marathon Oil Company P O Box 196168 Anchorage, AK 99519-6168 Re: Corea Creek Federal # 1 .. Company Marathon Oil Company Permit # 95-123 Surf Loc 1500'FSL, 1500'FEL, Sec 12, T1N, R13W, SM Btmhole Loc 1500'FSL, 1500'FEL, Sec 12, T1 N, R13W, SM at 9000'TVD Dear Mr Sinclair: Enclosed is the approved application for permit to drill the above referenced well. Your application for a variance to the diverter requirements of 20 AAC 25.035(b)(1) to allow a single 16-inch diameter diverter line extending at least 100 feet from the nearest point of ignition without bifurcation is hereby approved. The permit to drill does not exempt you from obtaining additional permits required by law from other governmental agencies, and does not authorize conducting drilling operations until all other required permitting determinations are made. A weekly status report is required from the time the well is spudded until it is suspended or plugged and abandoned. The report should be a generalized synopsis of the week's activities and is exclusively for the Commission's internal use. Blowout prevention equipment (BOPE) must be tested in accordance with 20 AAC 25.035. Sufficient notice (approximately 24 hours) of the BOPE test performed before drilling below the surface casing shoe must be given so that a representative of the Commission may witness the test. Notice may be given by contacting the Commission at 279-1433. Chairman ~~) BY ORDER OF THE COMMISSION jo/encl c: Dept of FiSh & Game, Habitat Section - w/o encl Dept of Environmental Conservation - w/o enci , a~hon 011 Company ;11- 8-95 ; 3:14PM ; Anchorage~ 907 276 7542;# 2/ 2 TO: FROM: DATE: Bob Crandall, Alaska Oil & Gas Conservation Commissi?.n David L. Brimberry, Exploitation Geologist, Marathon Oil Company--s/ Anchorage · v November 7, 1995 RE: EXPECTED PRESSURE GRADIENT MARATHON COREA CREEK FEDERAL #1 {CCF1) SEC. 12-T1 N-R13W PTD KENAI PENINSULA BOROUGH, ALASKA Marathon expects to encounter pressure gradients not exceeding 0.5 psi/ft (Mud Weight equivalent. 9.6 #/gallon) while drilling the CCFI. Drilling operations will use mud weights at or below 10 #/gallon. Surrounding well data supports this expectation and plan. These nearby wells which have drilled the prospective stratigraphic section at comparable depths and with mud weights not exceeding 10.5 #/gallon ( pressure gradient- 0,52 psi/fi) recognized no overpressured section. Texaco Ninilchik #1, Sec. 22-T1N-R12W, 10-10.1 #/gallo~, 1979 Marathon Clem Gulch I-X, Sec. 3~T1N-R13W, 10 #/gallon, 1965 ~0¥ 0 ~ 1995 Un,on Clam Gulch 1, Sec. 28-T2N-R12W, g.5 #/gallon, 1979 Mobil Ninilchlk 1, Sec. 24-TIN-R14W, 10-10.2 #/gallon, 1964 .~ta~.= .0ii & Gas,Cons. C0mm[ssi0~ Socal Falls Creek 43-6, Sec. 6-T1N-R12W, 10.3 #/gallon, 1973 .... , ~cti0rage. Socal Falls Creek 2. Sec. 23-T-1S-R13W, 10.7 #/gallon, 1966 Additionally, mudlog D-exponent data indicates a normal pressure gradient from surface to TD ( 10,877 TVD) in the Texaco Ninilchik//1. The Socal Falls Creek 81 (1961, CCF1 nearest offset), Sec. 6-TIN-R12W, and the Union Ninilchik 1 (1962}, Sec. 6-T1 S-R13W, drilled with higher mud weights; 10-12,8 #/gallon and 11.3-11.5 #/gallon, respectively. These wells were the first on the large Ninilchik structure. Drilling operations were, as expected, cautious. Subsequent production testing in the Falls Creek #1 identified a gradient of 0.45 psi/foot {8.6 #/gallon} in the prospective gas sands of the CCFI( Socal Falls Creek 1; 7350 TVD). This information shows that the mud weights were excessive for the drilled intervals. The limited seismic data ac~oss the CCF1 has no pressure anomaly signature. The limitations of the data do not allow a full interpretation for pressure anomalies; however, the well control satisfactorily evaluates the area for abnormal pressure and indicates none. J.V. Miesse, Exploitation Manager, Marathon Oil Company, Anchorage M.F. Sinclair, Drilling Superintendent, Marathon Oil Company, Anchorage Alaska F~" n Domestid, , oduction Marathon Oil Company November 6, 1995 Blair Wondzell Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501-3192 RE: Corea Creek Federal No. 1 Permit To Drill P.O. Box 196168 Anchorage, AK 99519-6168 Telephone 907/561-5311 Dear Blair: Enclosed is the information you requested for Pool Rig 122's diverter system. Please include this information in the referenced well's APD. Thank you. Sincerely, M. F. Sinclair Drilling Superintendent M FS/kz: MFS1106.1tr Enclosure A~S~ ~ii ,& Gas ,Con~. ,CQmn~iss~oD ...... , L~chorage ' A subsidiary of USX Corporation Environmentally aware for the long run. eUp~o~iou.d. = , uo]9~!t~tuoo 'suoo se9 '9 fid ~e{9 ~66~ g 0 AON I : I 400' 60'-0' ~55'-5 ?/~6' I0' DIVERTER LINES I 125°-0"~~ OFFICE 1.3,000 Fl- 7'' CASING DRILL PIPE STORAGE 3,000 FI' 5/8 c,~s~ 3oo'-o ~/¢ N,OV 0,3 19'95, glas_~.Oil A Gas Cons. Commission : ~chorage 1HIS IS A PROPRIETARY D~SION OF P.A.A. REPROOUCTION OR USE OF' THIS DESIGN IS PE~RMISSIBLE ONLY IF AUTHORIZrn IN WRrflNG BY P.A.A. POOL AR~IC ALASKA ~801 ~ Anchomge, Noelm 96518 MARATHON OIL COMPANY COREA CREEK FED. NO. 1 PAA RIG 122-D , ov oL .... ,, ~ch0raoe DIVISION OF SPILL PREVENTION AND RESPONSE INDUSTRY PREPAREDNESS AND PIPELINE PROG~H November 1, 1995 T.J. Kovacevich Marathon Oil Company P.O. Box 196168 Anchorage, AK 99519-6'i 68 SUBJECT: Marathon Oil Company Corea Creek Federal No. 1 ii Dear Mr. Kovacevich: 70NY KNOWLE$, GOVERNOR 555 Cordova Street Anchorage, AK 99501 Telephone: (907) 269-7500 Fax: (907) 269-7652 On September 26, 1995, we received a letter from you, dated September 26, 1995, requesting an exemption from the requirement for a state approved oil discharge prevention and contingency plan for the referenced project, since this activity would apply to natural gas production only. This exemption from AS 46.04.030, is authorized under AS 46 04.050(b). Included with your letter was a Geologic Summary of the Corea Creek Federal #1(9/14/95), Tyonek T2 Formation figure and a Stratigraphic Chart of Cook Inlet At our request, the State of Alaska Oil & Gas Conservation Commission (AOGCC) also provided an evaluation of the information provided by Marathon. The AOGCC also evaluated additional information provided separately to the ^OGCC to assist in their evaluation, which included a gas analysis from the Falls Creek No.1 well, seismic data in the proposed location, a well log cross section through the prospect, and a variety of well data from ^OGCC files. The attached AOGCC letter of October 23, 1995 outlines their evaluation and conclusions of the potential for encountering oil in the Corea Creek Federal No. 1. Based on our review of the information submitted by Marathon and the conclusions of the AOGCC, the ^DEC concurs that your.proposed gas well drilling program, as outlined in your letter, is exempt from the requirement for a state approved oil discharge prevention and contingency plan and financial responsibility. This is in accordance with AS 46.04.05(b), which exempts facilities solely involved with natural gas production. This determination was based on the substantial geologic structure information that exists and that supports the conclusion that any drilling activity to the Tyonek Formation in the Corea Creek Federal #1 lease area near Clam Gulch on the Kenai Peninsula will produce T.J. Kovacevich Marathon Oil Company November 1, 1995 only dry gas, with a very Iow potential for producing any liquid oil. This is supported by AOGCC's conclusion that "Given these conditions, it is unlikely the Corea Creek Federal No. 1 well, as proposed, will encounter oil". As such, this activity would essentially require no response capability for an oil discharge, and thus meets the intent of AS 46.04.050(b). Also, this well drilling is not considered exploration, since the information provided indicates there is a significant history of previous exploration conducted in the same area that substantiated the existence of a gas pool and lack of free oil within the formations being drilled to. Be advised that this determination does not release Marathon from the obligation to comply with any other applicable state or federal reouirements for this proposed drilling project- In particular, any drilling permit issued by the ^OGCC. If at any time, significant levels of oil are encountered, Marathon must immediately report this to the ADEC for a revised determination. If you have any questions, please contact Ken Rogowski at 269-7540 or Joe Sautner at 269-7539. Sincerely, Tom Chapple, ~' ~' Manager, Industry Preparedness and Pipeline Program TC/J S/KG R (SPAR/g: eq-clerlkRogowsk/Marathon. GAS) Encolsure: AOGCC letter, October 23, 1995 CC: Joe Sautner, ADEC/SPAPJEPR/Anc Glenn Adams/ADEC/SPAR/IPPP, Juneau Mike Munger, ^DEC/SPAR/EPR, Soldotna David Johnston, AOGCC, Anc w/o atch Ann McCord, CIRCAC, Soldotna Molly Birnbaum, ADGC, Anc TONY KNOWLE$, GOVE/~IVOR ALASi~& OIL AND GAS CONSERVATION COMMISSION 3001 PORCUPINE DRIVE ANCHORAGE, ALASKA 99501-3192 PHONE: (907) 279-1433 FAX: (907) 276-7542 October 23, 1995 Joe Sautner Dept. of Environmental Conservation 555 Cordova Anchorage, Ak. 99501 Dear Mr. Sautner: The Commission evaluated the potential of the proposed Corea Creek Federal No. 1 well for encountering oil in response to your correspondence dated October 4, 1995. In addition to the geologic summary prepared by Marathon Oil Company, the Commission examined a gas analysis from the Falls Creek No. 1 well, seismic data in the proposed location, a well log cross section through the prospect and a variety of well data from the Commission's files. These data support the following conclusions: 1) the gas accumulation in the Falls Creek No. 1 well consists of dry (unassociated with liquid hydrocarbons) gas and is not common to adjacent wells, 2) the Corea Creek Federal No. 1 well will likely penetrate the same fault block as the Falls Creek No. 1 well, and 3) the interval likely to be penetrated by the Corea Creek Federal No. 1 well is the same as that interval containing dry gas in the Falls Creek No. 1 well. Given these conditions, it is unlikely the Corea Creek Federal No. 1 well, as proposed, will encounter oil. · Chairman ~ . cc: Corea Creek Federal No. 1 well file ARCO Alaska, Inc. Post Office Box 100360 Anchorage, Alaska 99510-0360 Telephone 907 276 1215 J. Patrick Foley District Landman Telephone (907) 265-6283 Fax (907) 263-4966 September 6, 1995 Mr. Bradley G. Penn Marathon Oil Company P. O. Box 196168 Anchorage, AK 99519-6148 Dear Brad: Letter of Non-Objection Drilling Unit Exception Corea Creek Well By your letter of August 16, 1995 you notified ARCO of your intent to obtain a drilling spacing unit exception for a well drilled in lot 2 of Section 12, TiN, R13W. ARCO Alaska, Inc. is the owner of 50% working interest in the Falls Creek Unit leases, lying in the spacing unit immediately to the north of your proposed well spacing unit. ARCO has no objection to your proposed spacing unit comprised of the following lands: Township 1 N- Range 13 W, S.M. Section 12:N/2 N/2, S/2 Section 13:N/2 N/2. We wish you the best of success in your proposed drilling venture and we will be prepared to discuss the possible expansion of the Fails Creek Unit should your well result in a commercial discovery of hydrocarbons. Sincerely, J. Patrick Foley District Landman ARCO Alaska, Inc. Is a Subsidiary of AtlantlcRIchfleldCompany sEP '! 4 1995 Gas Cons. C0mmission Anchorage · ~lara~hon 0il Company ; 8-10-95 ; 7:37AM ; Anchorage~ Alaska Region Domestic Production 007 276 7§42;g 1/ 8 Marathon Oil Company P.O. Box 190168 Anchorage, AK 99519-0168 Telephone 9071561.5311 FAX COVER LETTER PLEASE DELIVER THE FOLLOWING DOCUMENTS TO: Name Company iii .... i , ,, Department/Location i.. iii i..i, , i Facsimile Number '~ '--/5'- ~ Z ... ,~,, ,.1=$1 Number of pages (including this cover page) ~-' . ' ' 1 "' r' Ill ,, ..... ',,I "" , , ...... ,, _1 ii i. ,, FROM: Department/Extension _,, i % ds ..... ,,, Il I1'1 , I,I ! Facsimile Number (907) $64-6489 iiii IIII .... ISm {, ff transmission is not complete, please call (907) $61-531L A subsidiary of USX Corporation ..Mara:hon 011 Company 8-10-9{5 ;7:37AM ; Anchorage-, .-.-~ ::.,:.: .............................................. ( · ........ , 907 276 7§42;# 2/ 8 F, sm 4.,i14{ . ' ,A~chor~m ol~sd,~ ' . ' T, ,'i N,, R. It2 W., Sec, 18, Lot s; aec. 2s. T. I N., 2t. ],SW.. Sen. 12, Lots ~a. x~-, Lots ~c, ~2, Lot 1; fi~c. 1'~¢ Lots Tha areas described ggg~%,ate ~.,{;9a.23 acrez, :,ecordlng to the OLq. cial Plats of the gurveys of tl~ mid L~Ui~., .'~n file la the Bu~e,~u of La'Id l~i~aagem~at: 51OW KXOW YI~, Tha.t tho UNITED grATES OF AMEItIC~,~, la ooflside]~afloa ~ the preSSeS, and hi uoafor~ty with tim said Act of Con~ese~ 1~5 ~N A}ID G~NT~D, and by these pren~tn DO~ G~E AND G~NT, ~to thn ~ald ,~te of ~lm, ~d to a~l~n, the tra~La of L,nnd ~bovo dosorlb~d; TC) IIAVE ~]3 TO l'IO~ ~io ~, to.thor ther~ bdon~g, ~to the said State ~f AtaaZa, and to its asM~a forever; to any Ves~¢l and accrued waer rlgl:t$ for raiMa.g, tlgrioigtar~, nmn~ott~i~, or ~her pm'p0Sea, ~d rJ~ht~ to ditches and reservoirs asod in ootmee~oa wire such w~ter rights aa ~y be rec<:~iaed and ackuowl~g~ by tl~e local cusWms, la~s Rad d~lSl0aa of eom,ts; ~ ~ere i$ reserved from ~o lando i,~er~y granted, a rigAt-Of'-way ~erom= tot (~tehea or canals eoaetr6cted by the nutliority of thc Ualtcd · t~larazhon 0tl Company ow .cleposlt~l ~aut of ), ns amended, 8-10-95 ; 7:38AM Anchorage-, 907 276 7§42;# 8/ 8 /.' o, · . 056668 Thru ~ alao .veAo~sd to the United 6laths at rlf,~ht,,o~-way for tim ~f rallrmds, telegraph ~ tsdsphane lines in aeeot'dauoe with tim Act ol March 19L4 ($8 S~t. I~05; 48 U.S.C. ~oo, 305). ,.. rh~,e s. au,. ~sm~ a r~t-~-,~a~ ~0, s ,,=~a~ 'a~e uee, r 2e u.s. c. ., Ir t~e r~a~me or its su. oees~r fn ~te~e~ d~n ~ oo~ ~ TL~ ~l of : , . . ,' ., ,, ,, ...',,,, , . . . . ., : ..'.. ,. Boere~ or ~8 dele~te may ~l~,ro ~za ~r~ ~ ~$ ~t ~lna~ ~ ~e 1~ pa~. The pate~, by ~o~e of ~e pmtent, abbess lot itseli ~ its ~te, ~erate W reve~ h'~ ~e Ualt~ t~s ball ~fl~ to t~e ~ lnv~v~ ~ ~ doolaratl, ml, Except that ti,is patoat shall not ~=m.'vay fha oil a~d ~s ri~te tu ~o I~~ tnnda ~1~ ~a, o~ ~ ~s l~sas ll~ ~1 ter~ta or be re~~,, b~ ~ t~~ov, or rdln~a~nt of ~m sad le~s, ~ ~ ~Ehts ~ l~s to ', '" , ',,~"i'E ",,~',I · ,~,~ ' '.~ :':;::,5 ~ 2.. ,, .: ~, ,~,,~: ,.,.~ . , As to the iollowing lpads~ ti, ia entry is ma,de under 6~ction l~ ~,~ iii,, Act af r~ry 2~, 11120 (41 SCat. 437) and the Act ct' M~trch 4, 19/t3 (47 $~t. J.S?O) and ~e patent i~ issued ~bJect tc the rzg/~ts o( prio~ P~x'~L~S or loesooa to ~e So much of tl~ ~uz-~c~ *i' the 8~d [az~d~ a~ lu rc~roci ior ~ ope~atl~ts for ~e (l~a~on ~:i tho lmtaes ami nay mztho'r/aod e~o:t,~tozla thoreol, without compe,lsa~oa to thc or, tee :ox' dm~go, rouul~ixtff [rc,~t Oropor J'tdt~&~tg opet-aflo~, .tvlarazhon Oil Company . ,~.'.. · I , ; 8-10-85 ; 7:38A~1 ; Anchorage-, B. 12W.t · I~ots 2, 3; I~. t, z, S, 4, Lots 2, 3; Lots 1, 2, W~SEt', SE{1,1W{; Lot 1; 907 276 7542;# 4/ 8 t {{~ t:.V ttl;dvr iffy {uttH]~ i:1 AIT~hOx~L~O) Alas~ tim Hm.k',.'e .f Tin' t'l{ilvd ~late:~ l t~,' ,,n.'~.h.ed an,[ BIGilTY-NXNTH. .~/'/~ /~ · d/[. C s. I ~ s. ........... (,.~,1 .~ ....~~~ tkoting Alaska ~ato Anc~orage~ · . . UU! Z/D /Oc-tZ;//: ~t 0 Nh. 6265 TEN AI;D t~O/lO0 .... DOLLARS lawful money of the United States, and other good and valuable considerations, now paid, the receipt whereo[ is · hereby ack,)owledged, does hereby grant to .. KENAI PENINSULA BOROUGH P.O. Box. 850~ Soldotna, Alaska 99669 and to its successors and assigns, all that real property situated in the BorouRh of Kenai Peninsula State of Alaska, and described as follows: TOWNSHIP 1 NORTH, RANGE_ 13. WEST, SEWA. RD MERIDIAN SECTION 13: TRACT B, Containing 5.41 acres, Subject to Right-of-Way Permit ADL 50685, ACCORDING TO THE SURVEY OF STATE LAND REFLECTING A REPLAT OF GLO LOT 1, CREATING TRACTS A, B, AND C, ALL LOCATED WITHIN SECTION 13, TOWNSHIP t NORTH, RANGE 13 WEST, SEWARD MERIDIAN, ALASKA, FILED IN THE KENAI RECORDING DISTRICT ON JUNE 30, 1970 AS K-1/14.~- SECTION 12: GLO LOT 2. Containing 30.51 acres. Subject to Right-of-Way Permit ADL 50685. GLO LOT 3, Containing 21,09 acres, SECTIDN 13' GLO LOT 2, Containing 35,69 acres, Subject to Right-of-Way Permit ADL 52029, SECT]OIi 14- GLO LOT 1, Containing 29,01 acres, Subject to Right-of-Way Permit ADL 52029, SECTION 23: GLO LOT 5. Containing 4.96 acres. Subject to Free Use Permit ADL 21666. SECTION 27- GLO LOT 5, Containing 6,72 acres, Vol. LXIII Page 65 ADL No. 55717 Patent NO. 6265 Page ) of 3 SEC¥ION 24' S1/2NE1/4. Excluding Rigl~t-of-Way Permit ADL 22605 (Parcel 024, Department of High:.;ays Proj:r.-c~ No. F-021-1(3) Soldotna to Nin~ lch~k), Subject to Right-f~f-Way Permit ADL 3q494. k'l/21;W1/4r~E1/~r~El/4, Excluding Ri§hr-of-Way Permit BLH Serial No. A-0612.92. E 1 / 2I'VE 1 / ~.IIE 1/~-. Subjec~ to Right-of-Way Permit Nos. ADL 3449~ and ADL 203021. Si,/1/4 I,~E 114r;E 1/4, Containing 115.00 acres. COItTAINING AI~ AGGREGATE OF 248.39 ACRES, I,;ORE OR LESS. Subject to valid existing trails, roads and easements. Subject to t. he reservation of a 50 foot wide lineal perpetual public easement along the mean high water mark of Cook Inlet as portrayed on the survey of sLaCe land reflecting a replat of GLO Lot l, creating Tracts A, B, and C, all located within Section 13, Township 1 North, Range 13 West, Seward i.leridian, Alaska, filed in the Kenai Recording District on June 30, 1970 as K-lTl4; the official township survey plaL o£ Towpship 1 North, Range 13 l~est, Seward Meridian, ex~mined and ~pproved by the U.S. Surveyor General's Office in Juneau, Alaska, on April 6, 1921; the supplemental survey plat of Sections 23 and ET, Township 1 North, Range 13 West, Seward Meridian, accepted by the United States Department of the Znterior, Bureau of Land Management in Washington, D.C., on May 12, 1952 and further subject to the reservation of a 50 foot wide perpetual public access easement to the aforementioned lineal public easement along the above body of water. Said public access easement shall be id~nLif'ied by the Gr~nlee and shall be subject to tl~e covenant that no development or conveyance shall occur on the land conveyed,by this patent until the Grantee has platted such easements and formally notifed the Grantor of the location of such public access easements. l~et chargeable acreage under A.S. 29.18.~01 is 245.97 acres. , Vol. LXIII Page 65 ADL No. 55717 Patent No. 6265 Page 2 of 3 .. to..,~ip 1 NORTH ~..g, 13 WEST SEWARD' Aia~3,a, mccotdi~'g Io ~e ol~c~l su~ey ~er~f m~ ~ ~Hb ~t~. Ab5ka. as G~nt~. here~' extoll}' ~vn, exce~g a~ z~'~ ~ ~ ~e ~nt ~reb; ~dc, unlo ;l~l(, hs ~. sK'c~s, Slid a~igfls I~ev~, all oils, X~. c~l. ~. min~, f~si~b~ mnt~ls, g~the~al r~. and ~s or ev~ e~. kind ar ~pti~. u~ ~ bnd~ I~ve du~. or any ~n the~J, and I~ ~hT lo exp~ ~ ume ~K ~ o~. p~. ~k ~, m~h, Ib~ mate~b, i~h~g . ~vc~K, dfiUing, and wmkin~ m~ ~ wei~ ~ [h~ ~ ~r h~s ~ ~ M ~d ~vinE ~JJom ~ s~h eR~ ~, c~ ~. m~S. rmi~b~ a~ig~ Ime~. ~e ~z by i~ er their agents. ~'ams a~ ail~s ~ any a~ a~ dm~ m e~. f~s~m~, ~in. ~, pi~.li~, ~werlin~. and raflft~dt, sink ~ch ~hah~. d~g ~uch ~.ellL remove ~ mil, a~ m r~a~ on ~Jd ~s ~ and to ~- n m~h al ~ b~a a~ ~y ~ ~q or ~ven~t l~ s~h ~ b~ ~y ~J a~GE~, u alarM, Eene~l~ all ~fhls a~ ~wer iff. lo. a~ ev~ MM ~d. w'h~her ~n ex~ ~ ~, re~nab~ ~ ~ conYenknl to re~ ~D ~BU~ ~b ~ ~J~ the ~M h~, I~et~ ~'~h tb te~, ~r~kam~ts. a~ a~fle~ th~nlOap~a~nf, unto the ~ Crant~ a~ ~ah, ralRv~urc~.~a~eolAbs~.pun~m~odtb~edau~he~W,~hi~ ]7~h doral. ~ecember A.D..19 I ss. TH 1 i~J') Judicial Oisrrkr ) L,TIIIa ~,~ ~n ~t~if~ ~at ~he_.. 17th ~arner T..Hay December· 19 8__~]. ~plllearf~ ~'J~'e mi, who i51~no~,~n to me to be the Dir~lw al tlw DiY~ of T~h~nl ~, d~umcm; t~t ~ ~t~ q.d ~meflt un~l J~h legal auf~ty a~ ~'ith k~'~RC of its c~i~ls: z~ [~ ~h ~ was ~d~ fr~ly and volun~Hly v~n Ihe premiss and f~ the puff ~lat~ thnein. . ",-' · ..:.: .N~m'), Public in and for Abr, ka My C(m~mission expir6 SlaKe Re~ord of P~tents VoL ...... LXII_I ........ ~,~. 65 AOL ~.'o. 55717 P,,,~ ~o. 6265 Page 3 of 3 C LJ :ii' T 0 ?"i [:'I::4-''r'r' ' 'i '":'A~''''':: r'L:c' :; F:,' qi'~ ::. !"~ :::.' i'": '/ -'; ~: = ::',' 4 ..... '," ::.: ......... .. .::' '". ] :...'. . ']. ........... : ..... · ..... .. t ....', i :':', :'.: ~.:. ,": ..... ~ ........ /:: i',! D D E F:' ''~'' HOU-? T Oi',[ -r:, .... :.'.' ...... '~ '" ::: ..... ~: !:' ~::' - ;'-~ 'r: ::: ~-. :-.t~/,? : L:-.,,, ~.~ ::' D A T E: I N Z '~' I A T E D · ~ ( .... 'i .:'2 .... i 95' 9 C A ;~:' E :'~' T A'T' U .? · A C T Z \/E T 0']" ::~'i L.. ,".~ C R F ~?}' Z, .::, 6 <-) ,. -? (i': (:? F'IL..E L. OCATION' D!V OIL. AND I_A2T ACT]:DN' /~6--24-:i994 R.F:F:'EAL..ED ?iEi',,!TAL. HFALTH HYF'CiTFIECATEI) L. ANI) N · :T T · (i) ~3 i ix! R ' (i:, 'i 2 W2 ' ,:') ? T 0 T A L. A C R E 2' ' (:,'.' ' ' .. · ' ' ^ "~ M :? T 8(.)i ~ R (.)i SW ,? ~;:'..?: I'OTAI N' ~' T' (-)(')~INR' Oi?;W S' '['i 'T'OTAL. ~:",~:,~:'t~,. ::~:~ - ,.;.~" ';,'~ - ,.'.~,, :.~,, ~.. :~:~ :.:,,, · a,, '~. S W ,~.~.. ' i ''~,.:. T 0 T A 1... A C,' F;,' E .~: ' .a..i. ,.'.:,: M' ,? T' ,.~(~i N R' (-)'.iSW .'_'~" i-,t-~.,. ..... . :.., 'i .'-':,- -.r 0 T A L. A C' Rlii: ;!;' 55:. 8 P / N P R E ,?,?E N T E R T 0 V I E: W ix[ E X T PA {:; E 0 R C L. Ii:' ~ R T 0 "[' E: R H I iq A T E I) 12 F:' L. A Y i",:t Hi ,:.. c:,, ,~l.. NA-r . ,,:,,o. ~..: F F:' I L.I.:.:: ~ D L .5 o ~:~ " ' : . ..... C :-.[ ,', t::. :" I L. E A B, R A C T P A [:~- E 2 ,?AL.E DATE ~" "/' B I D T YF'E ~t.;' Af... E NU.i~":'I':~. I::. ..... F,' 'I'R~CT NUMBER F' 0 R N N U H B E R C ON D I T I C) N A L. Y / N F'R I H A R Y T E: R M J :::; '~' 0 T A L A C: R I::.,.~ 64 (.) C'. A 2 E: A C T I 0 N,? t :P.-t (i~ .... i 95'9 T R A C T D iii: F:' 1' N E: D F:' I X E.I) R 0 Y A I..'i' Y ~:: ..... iS .... i:}:-2 DL.-'~ AL.,?O INC. L. LJDE,? $ .... 'I 3 .... t 4-5., i 2 .... '! 9 .... ~! 959 I-:', I :() F;,'E C'. E t V E: D ,?'¥'ATU,.? ( i 2 ) ~t I D '¥' Y F'lii: TOTAL.. BONI...!2 BID B c:' :'-:, r~ ~" T T A H 0 ~ Ii~t''l'' I:~:OYAI...TY ,?HARE % ,:'., ~ ~...~ iH 1, i--~ R I) 01 L. C: 0 M F:'A N Y (": F' B 0 T H NLJM BIii: R,:? A R E B L. L) C I, P/N N U M B E R 2., j""Rr" :" ? . · - :':. :::. ,~ ,.~ E N T E R T 0 V I E W ,N E:' X T F:' A G E [] R C L. ['-' A R '}" E} T E R ki I N A'T' E I) I ;~' P L. A Y Fax Note 767 ~, o.r.~_u~ CD · . . . · T/fi, RI W, $.sf/,f. 159-01 .............. .. .. .. . . -.,~ _::.;:'..-'.:' .'_..-. - .~ .'- .-: ..:.: . ,,.:,:-.,- - :...f~ .... - ;-.._ -: _.:.-:_-::, :. . . - : 1~'=2200' _ .:. - . ... .: . . _ .... .:----:-...'.:.}.::.:..:: . . . -, _ - ."; . · . -. ..... . .,,. ----- .,.....:.-.:...:::..~-;,.:. :~:-- -21 a,,,t,cL.'.'~4 ;....'-.:.:... -- · .'...-"'., :../.. !'-'...:- i "..:.:: .: - " ~ ~ -.:,... - ~.~.., :,'-., _-.- L-¥~.-:-~...'_.".,~ . .-... :: :'~::_-~ - . ::.. . -- _-. . ,,.,/ '- -...- / . -bO°+ -' NEHER SUB.- ~ -_ . . ,~ (,~, ..... ', '~,- :'?~ ~: ~,'~ ~v::':~7~'' ~ '? ~' ~ OF ~CT AS I~ICATED ON PR0~I'fION . GRID OF T~ COOK I~ET SHELIKOF S~IT SERIES Sec. 1 (Al!) 640 E% Sec. 2. 320 Sl~% Sec. ~ 10 160 Sec. 11 :(All) 640 Fracctona! Sec. 12' 419 " Sec. 13 35 " Sec. 14 ?:: .:'::. ::? ::.:.:, .'.:.. .......... ::: ..... ! 'i' (::)N i...'.,i!..-iliii:l".l F: '"'" "t ....... !-. I ";" ... . ~...~, ~:::.~ ..... 'J' !iii;~i!~i..ii!i!:'.iii!; L...E!:r:::'~!!i~Ei: h-.lO ,, (::'~ ..-.-O :2 -'-':i-::!!; ? '? l..d.. :i: ~,....,~ .... :(i.:.i Ei: F:;,' Ei: !B Ei: !::,t 'V i!ii: )::::, i:::'(::iF::: 'T F'~ i:::. "'; '~'"""'" 'I ............. i" H ...... .t... !...~ ~-.~,,...~ :i: l:::!i",j i ii.-- ... '" · ~ · , ,... ~.... ~, ~ .... ~/.:, ~...: i....E!:i:'.'.'~::iii:Ei: "f'E!:F:~:I'~"! ~:'.~l'ql":, ~:.:'~rxt './ ~., :. xl, :.1/,i . L.'.::. 'T'i'"tliii: F:;: iii?: i::) F::' "i" (:::! "i" H Ei: i...i ,, ~ii.", ...... LJi:::~ ~":i 'T' !...~ I::: .... "'"" I'", I...,',' ........ ~ ~:::.,-',..~'~ :i: N ~':'::~'T' .~. (::)N i:::) F::' 'T' H Iii{ i...ii:J:.,'-q ti!ii;!i!i: ,, I"I 'I :". ~::: ..... . , .... ,....~",.:F:'~t....~'!:~ ~::";:::"::::' :::'~:::'" "~:::"~"'~ ,~ ,~ ... i,..,.......~ .... ! ',..,' i.,...,,.,. ...... ~iii; H ~'.'::'~ L.,. J .... i:::~ r::'.'~'.iii~ tiif!; 'T' :..,""" ..... I .'",~:::~ ..... ~"".:::: "r', r...,"""r", ~:::. .... i:::)F: i':'.:"i i'-":,, ~ u.,=','".,l:::~::',....,,, ,,.,.., ,...., ,, r:.:',:t..i'T'j-..ji:::)j:;: :[ T:-d.. l:::)j:::' 'T'H~d: (.'.'~ i:::: "i" E)F::' ""7' /' :L :":i. /" ,.":"::, O ,'::';:':'.<':i. S"i"r::-~'T' ,.., ~ · ..~ .::::, ~-..] ~ ....... ~'::'.'~I'".i C; ..... Ei: S (::: i::~'. !:::i i:,} ,, ~'::.h F: F::' l.iii: "'""r' 'r i"-.I ~::":) L. ii!i: r::':'r ~!!!; i!i!: ',.:.'.'~ .- ,: :: :, ::;:'!: ,.":i-:::.!;':i':.-"":? :~ '.iiiit..J )::ii ~ii~ !.J I::i: !:::' i"-'::.'i ii::: l!!i: :j: I,. ~,.--, ~ , ~ ~.'-, ... ............ ~..,, ~..:. T t"-,!i:(') !:::~ :i: I .... ;~',: """ "" ""; ,'~ I ,."". :::::' i'" -"'"- l ....... : '""~ "" ~' '"': "'"" t.':,r..-'i::::: ...... ...~ ....... · ~...l~'~ ! :t: ~'::':.'ll....L. ";' L..~.Jr'..l\.;i:::. "~" ~:::..b~ 'T'!:::; C :1: i::;: :i: r:'.~ S F::'E:FR :i: ~:::: :i.. '5 ii!ii ;!'~ i:::'r:'-'.'t !50 '"" iiii A ..... ~'"'~ ":~; ":::-":~' 'i di:, C' ..............,..,...., ........ .-.~. '::..:;: r:::'~r'": i::R Ei: ii!! t::'.'~ i:::'(::) i.... i....::::) N ~iili; ~= :L N ,., .'l.. :::.!;t.,4 ~ ~iEiliii: C :i.. ::!!; :, I,I:"); ",i':" -"'"'"'"': ' ~'"' ....... ..':::, I:::. 1 '.] V.,.~. ::'"' r" --': ~' .... .... ~....~., .,:.. i'..~ ~:.. !~ ,~ ,.:;. ~ ~, s i.-:t ,..... T t'": i' 'i r::':'~ ~.iiil i....'.!iil ~.:~!:',iiii..--. ::':!;~i!ii ,, ::i< 'T' i::;'-, r:'.:'~ i::::'T' C l::::i F::' ~:::'.,'.i!i~ L. '.iiii: '::".... ,:'"'":, ...,<::,""" :f: liE; ~::::'.L.i ~'"'i , l i;. ~ i'"! ""' ;'"" ............ ,,,.,, itl !'"'i"t"F::~ '::::-', F::' r": -i :':~; .... :...~ .::::, ................... i....i:::i"i" :::.!; i:~,,,,',.~...~. :i: f'"'~.-.l ....... .~. ii!i; ¢..,~ i:::'i::::ii::R"t" :i: i':'ii'-..i (::)i:::' 'T'l...itiii: :::)~::;: :i: i':{~ :I: i'-,.Ir:'.'.'~i .... t....~:::i'T' :L. ~i::~ i---i ':'i!.4 i'-,! ,...~'""-~...,':::'- .... ."i ~::~., ,, !:::,... ':7 r::'.'t C F,' i!i!: '.!!ii; ,, ) i:::" tiii: l::i:. (::; iiii: N 'T' ............... r:'::~ iq F' '.:::i ',: :i.. "::", ,~ ~:::;....., ...., '':~' ,...,':::~ ....,":r 7' ::.':-', ,'"'""~ ~". ~'. :~:::",.': i:::' ';"~ 'T' (::) 'C :!: i:R :i: ":::'" :'"~ :;.. ,:!!:, :J.. ,."!b..::,/,, '"" r'""r';"- 'l .................... ,...; .,: .... ,, '""" ' I"~ ~:::. ~ r..i i'"-.Ii:::..t...,~ .~::..i ::--" LJ ,, ,....,'::::' ,, i::::: ]: i::;: :i: ' '.iii~ ~:::' :::' ~:::: i'"' =:::' :'- ~'''' '"'"'. r':-'' ;:::' "'"" i'.:: .... , '"' I. '"~" "-.' .... :.......~ .... '. · :... ~ .... :...,. i"S.: ~'".l ~ ('"il, :i: [iii:; i:::'f:'-"~ :i: )::) i::) :i: F;:iii!:i:::::'T'l...."'," .... l"(:::i (::: :l: i::;.." :l: F::' i!!!: i::;:,~"~l'"ii!i!;, ,.....,....'"": ~::: .....: ~:::'~:::'i" :i: i".-.ir.q'T' :t:~., I.. ....... .... =,',.~ "::"/' :?: .'::l./' '::::' ":'.' .,..... ,....,,._.., ~, ::.[.'.: (": "'! l~','ti".'l :l: "l""i" Ei::(:) 'T' i:::i J:::'~':-"-"~i....' ..... (::: i::,:: ii!!: liii: ........... · :., !....i N ii: 'T' l..'il!i!:i,... ~::) !:':':' '"','"' i:::' i::~'.i::::~):::, ...i r:::: 'T' :i: i:::)i"...i ,, !::{')':':':".; ':.::.~':;;i i.'-' .:?.-'.,. i:::~ i"'~ :i,. ,:::: N ~:':-,. ~"~"~,::.':.', ~;~. F::'B':'iL~....::::., ~.,i'~.'..::::.l:::.i ....... ti"',i '.[ 'T' ,.. r'", "7: ,' ! "~'.' 7:, (7? i..,. ,,:,~: ;-'~ ,::i 'q, :,-,--': .:::. r ....... i ? -i,:..'.i. :::~ ':2, , ,.., ~., ..,.,, ,, ,. ,_.., L.~. ~ ~,,' c;;.' '.. .. ::::~ ~'::':' 9! i:::: ~::::: :-... :::~, ':::'.'.'7' j::i: e'.:, <::~ (::::,::::: :-"' ::::~ ;: :::::,':: .... .... . ....~ ¢',........ ~.,. ~ ...... :",~ '.::; i'"~ ~::::~ ,.::~ ,. ......... ,: :.... ,~ -! ... !::~.: (:-::, :'::~ ~::::: ~:'.'.:~ F" ::::~ ',I ~::::~'? ..:.. ......1:::: :.-::~ :-.~.:..,. f':. .......... r": ;.-" [-'~ ,,; ,::::: ':;.:' I::;~,::.'.:, :.::.~ :::::: <:::: ~'" p :: 0 7 :::::r" ...'"' ... , 0";;" ~ '. :.':: C1 L, ,""'~ F" E:! ~ . . [:::.: ~:-.'.:-' q E:: :"', x" r", :; C"::'"" j::~: :.::.,.':'j F':,""~ x" I:::~ ~: ::7":.Y l:::~ ,'..::.:, ,:::i C ~::::: r" i:::~ :: 0':?' r"' ~.":~ ?' J:::~ :.:..'. ~:::! .... ,::: r" !::': ',: .... J::~: E.:' :::t ~'" ,'": ::" .""~" ..'"~ "F :"3 ..... ~.... (-: ?' :'",: :':' (:.:j ...... (::'.~ I"" ? :: ... :"':i ::::~ :':':'-" <::i i:::: ::::~ :' I:::: :I 0 7 J:::'.'::':~ g (:::: <::: r" :::::" '::::'-'7 .:<.'::, i::;;,::.:.:, !:;! (:::: ~:::, r" i:::' ": 0 '7 ?:;': "-::':":::i :::;'::::' ?' i:::' =" '::::":;'"" F::'-'. ,'..:.:::,::! ,..,""' ,'"', .... r" i:::' :: '~::::" ':."'"' J::;;,::::' ::::~ C:,::::, ~'" i:::' :: '::::"7' F:;; e.'-': r.::} (::: ~.:::, r" ::, ~: -'::::':;;" I:::~ ,.... (") ..... , ..,-......,.':! (::;:::::, r" t:::, r', .. j::~' ~'.:::,¢"~ (::::,::::, F' !:::: i: ('",' ..... "" 7;: ~'"..~.:.:-:, (::~ [:::,::::, t"" ~:::, ;'. i..:, .....' l:::=-'::'::-" 9! (::'; ~:::~ !''' i:::," :'":": !::;~ :':':' ~:::i E.: ~::::, !"" :::, ',~ .'.':::,'? : ":' '2 Xl..;:.!; ':i.:.:' :::::' Alaska R~ ~ Domestic~-roduction Marathon Oil Company P.O. Box 196168 Anchorage, AK 99519-6168 Telephone 907/561-5311 ;lust 3, 1995 Dave Johnston ska Oil & Gas Conservation Commission i1 Porcupine Drive ;horage, Alaska 99501-3192 erence: Corea Creek Federal #1 ~r Mr. Johnston: ;Iosed is the application for permit to drill the referenced well. Please advise if fitional information is required. ~se be advised that Marathon intends to seek an exceptional spacing unit for this well. s is necessary due to the fact that 120 acres in the northern part of Section 12 has viously been unitized. An application for an eXceptional spacing unit will be submitted ler separate cover. ;erely, F. Sinclair ling Superintendent '\DRILL95\MFS832 ;Iosure AUG 0 8 1995 l~ii & Gas Cons. Commi~ion '-, ~chorage ' A subsidiary of USX Corporation Environmentally aware for the long run. STATE OF ALASKA AL/{~ ~, OIL AND GAS CONSERVATION COMMIS~~' l PERMIT TO DRILL 20 AAC 25.005 la. Type of work Drill X_.. Redrill __Jlb. Type of well. Exploration X Stratigraphic Test Development Oil Re-entry DeepenJ Service Development G--as Single Zone -- Multiple Zone ~" 2. Name of Operator 5. Datum Elevation (DF or KB) 110. Field and Pool Marathon Oil Company 280 feetI Wildcat/'l'yonek 3. Address 6. Property Designation P.O. Box 196168 Anchorage Alaska 99519-6168 A-024399 4. Location of well at surface. 7. Unit or Property Name 11 .Type Bond(see 20 aac 25.025) 1500' FSL, 1500' FEL, SEC. 12, T1N, R13W, S.M. Corea Creek Federal At top of productive interval. 8. Well Number Number 5194234 1500' FSL 1500' FEL SEC 12 T1N R13W S.M. at 5100' TVD Corea Creek Federal #1 At total depth. 9. Approximate Spud Date Amount $200,000 _ 1500' FSL 1500' FEL SEC 12 T1N R13W S.M. at 9000' TVD 10/! 6/! ~%95 ..J,,..,. q ¢- 12. Distance to nearest 113. Distance to nearest well: 14. Number of acres in 15. Proposed depth (Md & Tvd) ,property line: 180 feetI 6,000 feet property: 899.46 9000 md / 9000 Nd feet 16. To be completed for deviated wells: 17. Anticipated pressure (see 20 aac 25.035 (e)(2)) Kickoff depth feet. Maximum hole angle Maximum surface: 3177 psig. Attotal depth(Nd) 3212 psig. 18. Casing program Setting Depth Size Specifications Top Bottom Quantity of cement Hole Casing Weight Grade Coupling Length MD TVD MD TVD (include stage data) 20" 133 ppf K-55 PE 200' 0' 0' 200' 200' Driven 17 1/2" 13 3/8" 61 ppf K-55 BTC 2500' 0' 0' 2500' 2500' 1868 sacks 12 1/4" 9 5/8" 47 ppf N-80 BTC 5100' 0' 0' 5100' 5100' 1534 sacks 8 1/2" 7" 29 ppf N-80 BTC 9000' 0' 0' 9000' 9000' 1207 sacks 19. To be completed for Redrill, Re-entry, and Deepening Operations. Present well condition summary Total depth: measured feet Plugs (measured) true vertical feet Effective depth: measured feet Junk (measured) true vertical feet Casing Length Size Cemented Measured depth True Vertical depth Structural Conductor ~' ~.~ ? ::' '~"" '~ Surface Y r '..'...,: .~ i Intermediate Production AU6 0 8 Liner Perforation depth: measured ~ ~L ~ (~as C0119. true vertical 20. Attachments Filing fee X.~ Property plat ~ BOP Sketch X Diverter Sketch X Drilling program X :Drilling fluid program X Time vs depth plot Refraction analysis Seabed report 20 AAC 25.050 requirements 21. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed ,~~,i~¢~, ..~..,~_~__~_~_.., Title Drilling Superintendent Date Commission Use Only Permit Number I APl number I Approval date I See cover letter o ¢' ? I-' ¢.,~/ Jfor other requirements Cor~ditions of approval Samples required ~Yes ¥_No Mud Icg required ",~Yes ._:..;No Hydrogen sulfide measures ,~Yes __ No Directional survey required __ Yes ~' No Required working pressure for BOPE __ 2M __ 3M X 5M __ 10M __ 15M Other: Original Signed By Approved by David W, Johnston byorderof //~/.~" Commissioner the commission Date / Submit ir ;ate DR!.m ;.lNG AND COMPLETION PROGRAM MARATHON OIL COMPANY ALASKA REGION WELL: PAD: SLOT: Corea Creek Federal #1 FIELD: A AFE No.: .~JA TYPE: Exploratory 6600695fdrilling)' 8700195(compietion) Exploration REVISION NO.: 2 DATE: 8/2/95 SURFACE LOCATION: 1500' FSL,1500' FEL,Sec. 12,T1N,R13W, S.M. TARGETS: Tyonek 1500' FSL, 1500' FEL. Sec 13. T1N, R13W @ 5100' TVD BOTTOMHOLE LOCATION: 1500' FSL, 1500' FEL, Sec 13. T1 N, R13W @ 9000' TVD KB ELEVATION: GL ELEVATION: 280 ft. mean S.L. (est.) 246 ft. mean S.L. (est.) I. IMPORTANT GEOLOGIC HORIZONS: FORMATION DEPTH(MD) DEPTH(TVD) Tyonek 5100 5100 II. ESTIMATED FORMATION TOPS AND CONTENT: FORMATION Tyonek DEPTH(MD) 5100 DEPTH(TVD) 5100 POTENTIAL CONTENT Gas ~':.., ~ i AUG 0 8 1995 Naska l~ti & Gas Cong. Commission , ~chomge page 1 ~ONTROL EQUIPMENT BLOWOUT PREVENTERS The blowout preventer stack will consist of a 13 5/8" x 5000 psi annular preventer, a 13 5/8" x 5000 psi double gate ram type preventer outfitted with blind rams ~n the eot-tom and pipe rams in the top, a 13 5/8" x 5000 psi drilling spool (mud cross) equipped with a 3-1/16" x 5000 [~si outlets, and a 13 5/8" x 5000 psi single gate ram ~/oe preventer outfitted with pipe rams. The choke manifold will be rated 3-1/16" x 5000 psi. it will include a remote t~ydraulic actuated choke and a hand adjustable choke. Also included is a poor- boy gas Duster, and a vacuum-type degasser. A flow sensor will be installed in the flowline and the mudpits wilt contain sensors to measure the volume of fluid in the surface mud system. Both sensors will contain readouts convenient to the drillers console. WELLHEAD SYSTEM STARTING HEAD: 20-3/4" 3000 PSI top x 20" SOW bottom CASING HEAD: 13-5/8" 5000 PSI top x 20-3/4" 3000 PSI bottom 11" 5000 PSI top x 13-5/8" 5000 PSI bottom TUBING HEAD: 11" - 5000 psi bottom x 11 "-5000 psi top. CHRISTMAS TREE: AUG 0 8 1995 Gas Cons. Commission ", ~chorage 3-1/16" - 5000 psi single christmas tree including two master valves, one flow tee, one swab valve, wing valve, manumatic and manually adjustable choke. IV. CASING PROGRAM: CASING DESCRIPTION SET SET TYPE SIZE WT. GRADE THREAD FROM TO(md/Nd) Drive pipe 20" 133 K-55 PE Surf 80'-100' Surface 13 3/8" 61 K-55 BTC Surf 2500'/2500' Intermediate 9 5/8" 47 N-80 BTC Surf 5100'/5100' P rod u cti on 7" 29 N -80 BTC S u rf 9000'/9000' SIZE WEIGHT GRADE CASING DESIGN SETTING FRAC GRD FORM PRSS DEPTH,TVD @ SHOE @ SHOE MASP DESIGN FACTORS TENSION COLL. HOLE SIZE 17 1/2" 12 1/4" 8 1/2" 13 3/8" 61 ppf K-55 2500' 12 ppg 1170 1800 7.33 2.46 9 5/8" 47 ppf N-80 5100' 14 ppg 2387 3177 5.46 1.34 7" 29 ppf N-80 9000' 4212 3177 3.09 2.63 BURST 2.24 2.21 2.37 page 2 .,,ENTING PROGRAM SURFACE 13 3/8" @ 2500'MD LEAD SLURRY' Halliburton Light Premium w/.2% CFR-3, .25% HALAD-344, .3% HR-7 TOP OF CEMENT: WEIGHT: YIELD: WATER REQ.: PUMPING TIME: EXCESS (%): ESTIMATED VOLUME Surface 13.6 ppg. 1.53 cu. ft./sk 7.59 gal/sk 5:04 hrs:min 50 % in open hole. 1355 sx TAIL SLURRY · Halliburton Premium w/.2% CFR-3, .3% HALAD-344, .1% HR-7 TOP OF CEMENT: WEIGHT: YIELD: WATER REQ.: PUMPING TIME: EXCESS (%): ESTIMATED VOLUME 2000 ft. 15.8 ppg. 1.15 cu. ft./sk 5.0 gal/sk 5:01 hrs:min 50 % in open hole. 513 sx RUNNING AND CEMENTING DETAILS: ENSURE WEAR BUSHING IS REMOVED! 1. Remove thread protectors and visually inspect connections. 2. Make up float shoe and 2 shoe joints. Check float. Fill pipe until circulating. 3. M/U float collar. (Baker-lok all connections to top of float collar) 4. Fill pipe until circulating. 5. Run remaining casing. M/U cementing head, install bottom plug and test all lines. 6. Circulate and reciprocate until no gains in circulating efficiency is made. 7. With as little shut down as possible, drop bottom plug and begin pumping spacer. Pump spacer as follows: 20 bbls drill water 20 bbls Super Flush 20 bbls drill water 8. Mix and pump 369 bbls. lead slurry(1355 sx). 9. Mix and pump 105 bbls. of tail slurry(513 sx). Drop top plug. 10. Displace cement. Reciprocate as long as possible. 11. Bump plug w/500-1000 psi over final circulating pressure. Check floats. 12. P/U BOP stack. Set slips. N/U casing spool. N/U BOP stack. 13. WOC 12 hours. 14. Test BOPE. ~. ~.~.. , ~:.~ ;,.. .,. ~ ? AUG 0 8 l!)90 1;111 .& Gas Cons. Commi~ion page 3 ·, ERMEDIATE 5/8"@ b;-'/5'MD LEAD SLURRY' Halliburton Light Premium w/.2% CFR-3, .25% HALAD-344..3% HR-7 TOP OF CEMENT: WEIGHT: YIELD: WATER REQ.: PUMPING TIME: EXCESS (%): ESTIMATED VOLUME Sudace h. ! 3.6 ppg. :.53 cu. rt./sk 7.59 gal/sk 5:04 hrs:mln 50 % in open hole. 1034 sx TAIL SLURRY · Halliburton Premium w/.2°,/0 CFR-3, .3% HALAD-344, .1% HR-7 TOP OF CEMENT: 4075 ft. WEIGHT: 15.8 ppg. YIELD: 1.15 cu. ft./sk WATER REQ.: 5.0 gal/sk PUMPING TIME: 5:01 hrs:min EXCESS (%): 50 % ESTIMATED VOLUME 500 sx RUNNING AND CEMENTING DETAILS: ENSURE WEAR BUSHING IS REMOVED! 1. Remove thread protectors and visually inspect connections. 2. Make up float shoe and 2 shoe joints. Check float. Fill pipe until circulating. 3. M/U float collar. (Baker-lok all connections to top of float collar) 4. Fill pipe until circulating. 5. Run remaining casing. M/U cementing head, install bottom plug and test all lines. 6. Circulate and reciprocate until no gains in circulating efficiency is made. 7. With as little shut down as possible, drop bottom plug and begin pumping spacer. Pump spacer as follows: 20 bbls drill water 20 bbls Super Flush 20 bbls drill water 8. Mix and pump 282 bbls. lead slurry(1034 sx/. 9. Mix and pump 102 bbls. of tail slurry(500 sx). Drop top plug. 10. Displace cement. Reciprocate as long as possible. 11. Bump plug w/500-1000 psi over final circulating pressure. Check floats. 12. P/U BOP stack. Set slips. N/U casing spool. N/U BOP stack. 13. WOC 12 hours. 14. Test BOPE. page 4 AUG 0 8 1995 il. ii & Gas ,Cons. Co. mmissi~,n .~CTiON: 7" ~ 9261'N(~ ir..' LEAD SLURRY- Halliburton Light Premium w/.2% CFR-3, .25% HALAD-344, .3% HR-7 TOP OF CEMENT: WEIGHT: YIELD: WATER REQ.: PUMPING TIME: EXCESS (%): ESTIMATED VOLUME Surface : 3.6 ppg. ~.53 cu. ft./sk 7.59 gallsk 5:04 hrs:min 50 % in open ~ole. 425 sx TAIL SLURRY · Halliburton Premium w/.2% CFR-3, .3% HALAD-344, .1% HR-7 TOP OF CEMENT: WEIGHT: YIELD: WATER REQ.: PUMPING TIME: EXCESS (%): ESTIMATED VOLUME 4500 ft. 15.8 ppg. 1.15 cu. ff./sk 5.0 gal/sk 5:01 hrs:min 50 % in open hole. 782 sx RUNNING AND CEMENTING DETAILS: ENSURE WEAR BUSHING IS REMOVED! 1. Remove thread protectors and visually inspect connections. 2. Make up float shoe and 2 shoe joints. Check float. Fill pipe until circulating. 3. M/U float collar. (Baker-lok all connections to top of float collar) 4. Fill pipe until circulating. 5. Run remaining casing. M/U cementing head, install bottom plug and test all lines. 6. Circulate and reciprocate until no gains in circulating efficiency is made. 7. With as little shut down as possible, drop bottom plug and begin pumping spacer. Pump spacer as follows: 20 bbls drill water 20 bbls Super Flush 20 bbls drill water 8. Mix and pump 115 bbls. lead slurry(425 sx). 9. Mix and pumD 112 bbls. of tail slurry(782 sxt. Droo top plug. 10. Displace cement. Reciprocate as long as possible. 11. Bump plug w/500-1000 psi over final circulating pressure. Check floats. 12. P/U BOP stack. Set slips. N/U tubing spool. N/U BOP stack. 13. WOC 12 hours. 14. Test BOPE. AUG 0 8 1995 Oil & Gas Cons. Commission ;Anchorage page 5 ROGRAM MUD PROPERTIES DEPTH DEPTH WEIGHT VISCOSITY WATER MUD FROM TO ppg sec/qt LOSS TYPE 0' 2500' 8.6-9.0 40-80 10-15 Gel/Water 2500' 5100' 9.0-9.5 40-60 5-10 Low solids/ND 5100' 9000' 9.5-10.0 40-60 <5 PH PA\KCL MUD EQUIPMENT The solids control equipment will consist of two derrick floline cleaners, a 2-cone desander, a mudcleaner, and a Swaco 518 centrifuge. VII. LOGGING, TESTING, AND CORING PROGRAMS LOGGING PROGRAM PRODUCTION: To be determined. COMPLETION: A Cement Bond Log (CET/GR) and directional gyro survey will be run prior to completion and testing. CORING PROGRAM None planned at this time. TESTING PROGRAM Approximately 15 days of testing are planned.Testing would be through temporary test equipment with the gas being flared. VIII. BOTTOMHOLE PRESSURES AND POTENTIAL HAZARDS Hydrogen sulfide gas is not anticipated to be encountered. The Tyonek zone is expected to be normally pressured. No other known hazards. AU$ 0 8 991i page 6 NIISIill ltll& Gas, C0mml 10n · ,~ INFORMATION DIRECTIONAL PLAN NORTH WEST VERT DESC MD TVD INCL AZIM COORD COORD SECTION RKB KICKOFF, (Tie-in) END OF BUILD END OF HOLD END OF DROP TOTAL DEPTH POTENTIAL INTERFERENCE: None WELL DISTANCE (ft.) DEPTH (MD) DRILLING DRILLING PROGRAM Mobilize rig to location and rig up. Drive 20" casing to refusal (80-100'). Weld on starting head. N/U diverter and test. Clean out 20" casing and drill 17 1/2" hole to 2500'. Run and cement 13 3/8" casing. Set slips and packoff. N/U casing spool and test. N/D diverter and N/U BOPE and test. RIH with 12 1/4" bit and drilling assembly. Test casing to 2000 psi. Drill out and test shoe to 12.0 ppg EMW. Drill to 5100'. Run and cement 9 5/8" casing. Set slips and packoff. N/U casing spool and test. Test BOPE. RIH with 8 1/2" bit and drilling assembly. Test casing to 3500 psi. Drill out and test shoe to 14.0 ppg EMW. Drill to TD. Log. Run and cement 7" casing. Set slips and packoff. N/U tubing spool and test. Test BOPE. Run CET and Gyro. Complete and test per program. COMPLETION: Cleanout casing to PBTD. Run gyro and CET/GR. Complete as per completion program. RECEIVEb AU6 0 8 1995 Alaska 0il & Gas Cons. Commission Anchorage page 7 i' ~OP STACK CONF'I~URATION 51'8 RSRRA CHOKE WING UcD/OY 4 TYPE E GATE VALVE HYDRIL 1.] 5/8'-5000PSI f ~ GK ANNULAR BOP SCRE'W HEAD i I t3 5/8'-5,000P~ HUB ~OU CONNE~ON r ~UB~ ~ ~ HUB ~NNE~ONS 73 5/8'-5,0OO PSI HUB ~' X 73 5/8'-5,0OO PSI FLG. ffYDRIL I..t 5/8"-5,000PSI HPL RA~ BOP HUB CONNECTIONS 4 t/t6'-5,DOOPSI SIDE OUTLETS ~[H ~a~NUAL LOCKS BLOW-OUT PREVENTER STACK RIG 7 22 D AUG 0 8 Oil & Gas Cons. Commission ~ ~ ~_.. 1"-5000PSI I I I I t:~ALL VALVES i i I ~ i r---- j i , ~~~Fi 6 IFE L YE ANSI 500 FI_ANGES lY't~ .3 PI CS OPEN CLOSE HYDRIL MSP 2000PSI ANNULAR PAA RIG 122 D 21 1/~4'' - 2M DIVERTER STACK AUG 0 8 199,$ ~Jl & Gas Co~ 1. DIVERlt't? ANN[/IAh' t,J( OPEN. 2. VAL V£' "A" NORMAl l Y CI J.' VALVE "B" NORMALLY Ot'L'N. 4. VALVE "C" NORMALLY CIOSLI). 6. SYSTEH DESIGNED SO T/tA/ WttEN TI IE ANNULAR IL) Ct OSED, VALVE "A" MA IICAI 1 Y OPENS. 6. WttEN VAI VE "C" I~.; ()t~t t.J! 1~, VAI VE "fl' AlJ10HAIICAl l Y CLOSES. 7. USING [3.4l.t VAI VLS "[)" 3,: "[~', VAI Vt_ "B" CAN t~L' ISOLATED fO REMAIN WttEN OP[NING VA! VE "C". CHOICE MANIFOLD SCHEMATIC PAA RIG 122 AUG 0 ~sisa, ~.JJ & .Gas Cons. C~ 1. McEVOY I~r'PE C 5 1/8"-5000 PSI GAlL VAlX,,L 2. McEVOY TYPE C 2 1/16"-5000 PSi GATE VALVE ,:1. SWACO 2 1/16-5000 PSI REMOTE CttOKE 4. THORNttlLL-CRAVER ,3 1/8"-5000 PSI MANUAl CttOKE 5. FLANGED TEE 2 1/16" X 2 1/16" X 2 1/16"-5000 6. 5 WAY FLOW BLOCK 3 1/8' X 5 1/8" X 2 1/16" X 2 1/16" X 2 1,,'16"-5000 PSi 7. 5 WAY FLOW BLOCK 3 1/8" X 3 1/8" X 3 1/8" X 3 1/8" X 2 1/16"-5000 PS1 8. 4 WAY FLOW BLOCK 2 1/16" X 2 1/16" X 2 1/16" X 2 1/16" 5000 PSI 9. 2 1/16"-5000 PSI SENSOR BLOCK 10. 2 1/16"-10,000PSl X 2 1/16"-5000 PSI ,SPOOL 11. ,,t 1/8" X 2 1/16"-5000 PSI SPOOL 12. 2 1/16' X 2 1/16"-5000 PSI SPOOL 1~. 5 1/8"-5000 PSI X 2 1/16"-5000 PSI SPOOL. 14. 2 1/16"-10,000 PSi X 2 1/16"-5000 PSI DOUBLE SI~J~ 15. 2 1/16"-5000 PSI 1ARGET FLANGE 16. 3 1/8"-5000 PSI 'IARGET FLANGE 17. 5 1/8"-5000 PSI X 2 1/16"-5000 PSI DOUBLE SIUL) 18. 3 1/8" X 3 1/8 5000 PSI SPOOL 19. 3 WAY FLOW BLOCK 3 1/8" X 3 1/8" X 3 1/8"-5000 PS1 N C) C) - ADI F~41..L$ CK UN ! !21,111 A024399 !9 HnRnTHON OIL OOHPnNY Alaska R~.' 1 Domestic ~ ...'.duction Marathon Oil Company P.O. Box 196168 Anchorage, AK 99519-6168 Telephone 907/561-5311 July 18, 1995 Robert P. Crandall Sr. Petroleum Geologist Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501-2192 Dear Mr. Crandall: Subject: Designation of Operator ADL 590 Attached for your handling are the change of operator forms for ADL 590. Sincerely, Advanced Landman H:\WP\EXPLg5\BGP7181 Attachment RECE ¥ D JUL I 9 1995 Alaska 0il & Gas Cons. C0mmissi0n Anchor,,, A subsidiary of USX Corporation Environmentally aware for the long run. STATE OF ALASKA ALASKA ~_ AND GAS CONSERVATION CO~k' iISSION DESIGNATION OF OPERATOR 20 AAC 25.020 1. Name and Address of O%4ner: Cliff Burglin, The Estate of James Lundgren, Mary Gustafson, Michael Sexton, Bruce Burglin, Barbara Burglin, David Burglin, and Brian Burglin. C/O C1 iff Burgl in P.O. Box 121 Fai,'~anks, AK 99707-0131 2. Notice is hereby given of a designation of operatorship for the oil and gas property described below: ADL 590 Legal description of property: Township 1 North, Range 13 West, S.M. Section 1: N½N½, S½NW¼,SW¼NE¼,N½SW¼,SW¼SW¼ Section 2:E¼ Section 10:SE¼ Section 11: ALL Section'12:NW¼NW¼,S½NW¼,S½NE¼,S½ Section.13: All, except that portion lying above the line of mean high tide Section 14: ALL, except that portion lying above the line of mean high tide LL Property Plat Attached ~ Section 15-( Aover) 3. Name and Address of Designated Operator: Marathon 0ii Company P.O. Box 196168 Anchorage, AK 99519-6168 4. Effective date designation: July 1, 1995 5. Acceptance of operatorship for the above described property with all attendant ~'e~.~ponsibili.ti~a~tions is hereby acknowledged. c, Jgned ~..~~~ .".~" Date '7/ ,./ ~/ N_ams (9rtnted~].. h, ~, ~"+/~'K--, Title(printed) ~OA ~D~-~ ,~%-~ 6. The o~,n~.r hereby certifies ~hat the foregoing is true and correct. Signed .~ ~.2. ~.. Date ~/ Title(printo~) ~k~ v%C ~- ....... Date ~ Commissioner Approved ~/~/~/~~ co~u~sstoner Date (requires two signatures) ALASKA OIL AND GAS CONSERVATION COMMISSION Form 10-411 Rev. 01-08-92 Submit in duplicate I I I I ! ! ! I ! ! ! ! T. IN., R. 'I'IItRI) REVI°I()N., I.~I:FEC'I'I~,,. APRIl. 1,198~ FALLS CREEK UNIT FALLS CREEK UNIT 13W. · DL 00§90 HBP I I I I I I '1 I I I I I I 14 I I ~RCO-ET AL I ADL-OO590 I IlRP ARC'_)- ET IIRP (I.. EALAND I I I I I ARCO- /.,;. ~:z ^c ILEMImI! HBP T. IN., R. 12W. AGO ARC()-I;T Al.I I 114. J. Ileal ) HeP I I I I I I I I I I I + I I I I I I I I I I I I I I + 10173802 N()RK I N(' IN'I'I';RI';,'-;T ()t,/l']l.;l{.'-; I'I.;iCCI':'4'I'A('I';~ OI.' t~¢)I~KIN(; IN'II'J~:ST IN FAI,I,S (:RI.:I,:I: IINIT 'l'r;l('.t N()s.: Al{(:() AI,ASKA , I.,'IC:. (:I,IFi" I~IIR(;I, IN I.:S'I^TE ()F .IA:II.:~ ]IARY (;ll,~; I'AF.q()N ;I I (:11,\1-:1, .% I.: X'I ',SRII(:F. I;llR(;I, Ill B,\I,'I~AI{A BIII~('I.IN .1()~1.:1'11 BIIR(:I.IH I),\V I~) BII',{(;I, I N lAN BI~I?¢;I,IN '1,10,1/,, ~5, ~6 ;l,:(I 37 15;' :? '; :,/. I r- ~/ ') ,> I AS IJSI':I)liE;Il:IN: "AR('O"-AR(',() AI,ASKA, l N(;. "ET 'Al,"- CI, i FI: BIII',¢;L Ill ].:S'I'A']'i~ ()F ,IA.HE~; !'lA RY (;IiWI'AFS();I ~IICIIAI:L BRIJCE BIIRf;LIN BARI!ARA BI]RCI, IN .I(')SEI'II BIJ!{(;I,IN I)AVII) BIIR{;l, lii BI,'IAN !}11R(;I,I;4 ARCO ALASKA, INC. lldlle ,, ,, ! O(~,., STATE OF ALASKA ALASKA - AND GAS CONSERVATION CoI.._alSSION DESIGNATION OF OPERATOR 20 SC 25.020 1. Na/ne add Address of (~ner: Cliff Burglin, The Estate of James Lundgren, Mary Gustafson, Michael Sexton, Bruce Burg]in, Barbara Burg]in, David Burg]in and Brian Burg]in. ' C/O Cl iff Burg] in P.O. Box 131 Fai,'[anks, AK 99707-0131 2. Notice is hereby given of a designation of operatorship for the oil and gas property described below: ADL 590 Legal description of property: Township 1 North, Range 13 West, S.M. Section 1. N½N½, S½NW¼,SW¼NE¼,N½SW¼,SW¼SW¼ Section 2- E¼ Section 10-SE¼ Section 11. ALL Section'12- NW¼NW¼,S½NW¼,S½NE¼,S½ Section 13. AIl, except that portion lying above the line of mean high tide Section 14- ALL, except that portion lying above the line of mean high tide Section 15- ~LL Property Plat Attached over) 3. Name and Address of Designated Operator: Marathon 0i] Company P.0. Box 196168 Anchorage, AK 99519-6168 RECEIVED JUL 1 9 1995 4. Effective date designation: July 1, 1995 Alaska 0il .& Gas Cons. Commission ~chor: -: Acceptance of. operatorship for the above described property with all attendant reaponsibil~~i0n,s is. hereby acknowledged. Signed ~~_~,. _ ..... ). Date "'>'~ / /~-~/ ~"~' Name (printed) L' ¢ ' P~ %"%'~ ~ '--/- 6. Tile owner hereby certifies that the foregoing is true and correct. Signed Date 7~'/~ Title(printed) Approved Date ~(~mmissioner . (re~ires'two signatures) ~~ OIL ~ G~ ~NS~VATION ~ISSION Form 10-411 Rev. 01-08-92 Sub~t in duplicate I I I I I TIIlRi) RI';VISI~)N EFFF. CTI~,,. APRII, 1,198.cj FALLS CREEK UNIT -+ I I I I I I I I I I I I I &DL FALLS CREEK UNIT T IN., R.13W. I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I ~RCO-ET AL I ADL=OO590 I IIBP A,RCg- ET A! A-o.41.9 lIMP (I.. EAL^ND ARCO- ARCO-ET Al.I I al. ,I. Ileet ! Il ILEde~d) A-024399 T. IN., R. 12 W. ! ! AGO I I I I I I I i I I I I I I I + 10173802 Wf)i,',K I N(; IN'I'I.iI{I';ST ()WHI.;RF '0 I'I.;RCI';qTA(;I.;,q O1.' NORK 1N(; [N'I'I:RI';ST IN l:Al,l,,q ('RI';I';I; IINIT 'l'ract N()~.: 'l,lf),14, ~$, ~6 ;ils(I 37 AR(i(} AI,A.'-;KA , I."'lf",. 5IY'~ ('I,IFi" i~II!:('I, IN 2251 !.;.'-;'1 ATE ()1: .I/~:li.;,c; I.II..'II)~:I{I:.H I 57 .'lA RY ¢;ll.q'l'A FS()N 37 :II (;IIAI.;i, ;~RII(;E I;IIR(;I, IH B,\I,'I;AI{A I:,111',(;I. I .l(),qEl'll BIII{{:I, I r,i I),\Vll) BIIR¢;I,IN AS I.ISi';I) Ill,;RI'i IN: __.. '2 I I 5% I 57:', i 5% ! 5% iiARCO";iARCO AI,ASKA, J NC. ET Al, - CI, IFF I~Ill',CLIII i'.'S'I'ATI; ()F .IAHE:; i.IIilI)(;RI.:,H HARY (;I;.qTA F.q(),'l '.!I CllAEL S EX'I'()N BRIJCE BIIRf;LIN I~ARI!AR^ I~IIR¢;I, IH .I().qEPII BIJR(;I,IN I)AVII) BIIRGI.lil Bh'IA;I I}IIR('.I, IN ARCO AI,ASKA, 1Mile I I INC. WELL PERMIT CHECKLIST redrll [] serv [] wellbore seg [] ON/OFF SHORE ~ ADMINISTRATION / 1. Permit fee attached ............... r - - -/~ 2. Lease number appropriate ........... i' . · · ./~-- 3. Unique well name and number .............. 4. Well located in a defined pool ............. 5. Well located proper distance from drlg unit boundary. 6. Well located proper distance from Other wells ..... 7. Sufficient acreage available in drilling unit ..... 8. If deviated, is wellbore plat included ........ .\% 9. Operator only affected party .............. 10. Operator has appropriate bond in force ......... 11. Permit can be issued without conservation order .... 12. Permit can be issued without administrative approval..t~ 13. Can permit be approved before 15-day wait ....... ENGINEERING tN N N N N N N N N N N N N REMARKS APPR DATE 14. Conductor string provided ................ Y N 15. Surface casing protects all known USDWs ......... Y N 16. CMT vol adequate to circulate on conductor & surf csg.. Y N 17. CMT vol adequate to tie-in long string to surf csg . . . Y N 18. CMT will cover all known productive horizons ....... Y N 19. Casing designs adequate for C, T, B & permafrost ..... Y N 20. Adequate tankage or reserve pit ............. Y N 21. If a re-drill, has a 10-403 for abndnmnt been approved..Y N 22. Adequate wellbore separation proposed .......... Y N 23. If diverter required, is it adequate ........... Y N 24. Drilling fluid program schematic & equip list adequate . Y N 25. BOPEs adequate ..................... Y N 26. BOPE press rating adequate; test to psig. Y N 27. Choke manifold complies w/API RP-53 (May 84) ....... Y N 28. Work will occur without operation shutdown ........ Y N 29. Is presence of H2S gas probable ............. Y N GEOLOGY 30. Permit can be issued w/o hydrogen sulfide measures .... Y 31. Seismic analysis of shallow gas zones ........ ~ ./~/ N Data presented on potential overpressure zones ..... Y 32. 33. Seabed condition survey (if off-shore) ....... /. Y N 34. Contact name/phone for weekly progress reports . ./.. Y N [explorator~ only] GEOLOGY: ENGINEERING: BEW JDH COMMISSION: DWJ~.~--~ Comments/Instructions: Z 0 rn ill HOW/lib - A:~FORMSkcheklist rev 11195 WELL PERMIT CHECKLIST A~.INiS~A~'IO~ .......... Permit fee attached .................. 2. Lease number appropriate ............... 3. Unique well name and number .............. 4. Well located in a defined pool .............. 5. Well located proper distance from drlg unit boundary. 6. Well located proper distance from other wells ..... Sufficient acreage available in drilling unit ..... 8. If deviated, is wellbore plat included .... ~.,WP, 9. Operator only affected party ............... 10. Operator has appropriate bond in force ......... 11. Permit can be issued without conservation order .... 12. Permit can be issued without administrative approval. 13. Can permit be approved before 15-day wait ....... ENGINEERING GEe'. ~ ~~ ~NI~# ?~._ ~ oN/oFF s~o~ ~/ GEOLOGY 14. Conductor string provided ............... ~ N 15. Surface casing protects all known USDWs ........ ~Y) N 16. CMT vol adequate to circulate on conductor & surf csg.~.~N 17. CMT vol adequate to tie-in long string to surf csg . . ~ N 18. CMT will cover all known productive horizons ...... (~Y~N 19. Casing designs adequate for C, T, B & permafrost .... ~ N 20. Adequate tankage or reserve pit ............ ~ N 21. If a re-drill, has a 10-403 for abndnmnt been approved. -~ 22. Adequate wellbore separation proposed ......... ~ N 23. If dive'rter required, is it adequate .......... Y~ N 24. Drilling fluid program schematic & equip list adequate 25. BOPEs adequate .................... .~ N 26. BOPE press rating adequate; test to ~ psig.~ N 27. Choke manifold complies w/API RP-53 (M~y 84) ...... 29. Is presence of H2S gas probable ............ N 31. Da, presented on potential overpressure zone, 32. S~ismiu a~alys~s qf sha11~ gas zo~s ....... 33. Seabed condition sudsy (if off-shore) ....... 34. Con,ct n~e/phone for w,kly progress re~rts . . GEOLOGy: ENGI~ERING: C~SSION: HOW/jo - A:~FORMS~cheklist rev 03/94