Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
HOME
EVENTS
DATA
Data List
Drilling
Production
Orders
Data Miner
Document Search
REPORTS
Reports and Charts
Pool Statistics
FORMS
LINKS
Links
Test Notification
Data Requests
Regulations
Industry Guidance Bulletins
How to Apply
ABOUT US
History
Staff
HELP
Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
210-087
1a. Well Status: GINJ Oil 1b. Well Class: 5 Exploratory Service BP Exploration (Alaska), Inc 14. Permit to Drill Number/Sundry 210-087 8/9/2010 8/18/2010 GL PRUDHOE BAY, PRUDHOE OIL 4a. Surface: Top of Productive Interval: Total Depth: 2308' FSL, 2396' FWL, Sec. 02, T11N, R13E, UM 2921' FSL, 839' FWL, Sec. 01, T11N, R13E, UM 2546' FSL, 230' FEL, Sec. 02, T11N, R13E, UM Surface: x- y- Zone -651960 5973828 ASP 4 11. Gas SPLUG 5Abandoned 20AAC 25.105 Suspended 20AAC 25.110 WINJ WAG WDSPL No. of Completions: 6/8/2020 15. 50-029-20089-02-00 16. PBU F-04B Well Name and Number: Surface / Surface 36.50 17. TPI:y- Zone -655669 ASP 4x-5974517 Total Depth: x-y-Zone -654608 ASP 45974120 11681' / 9045' None DNR Approval Number:19. 87-035 5. Directional or Inclination Survey: Yes No Submit electronic and printed information per 20 AAC 25.050 (ft MSL) 20.Thickness of Permafrost MD/TVD: GR / ROP / Res / Memory CNL / GR / CCL / MWD CASING WT. PER FT. GRADE SETTING DEPTH MD TOP BOTTOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED Location of Well (Governmental Section): Field/Pool(s): Date Comp., Susp., or Aband.:6. Total Depth (MD/TVD): CASING, LINER AND CEMENTING RECORD TOP BOTTOM 22. SETTING DEPTH TVD 13-3/8"x9- 9-5/8"x7" 3-1/2"x3-3 2-3/8" STOVE 96.5# 68#/47# 47#/26 9.3#/6.2 4.7# K-55 K-55/N-80 N-80 L-80 L-80 Surface Surface Surface 8551' 8540' 9312' 9647' 9760' 11679' Surface Surface Surface 7448' 7438' 8349' 8075' 8448' 9045' 3" 4-1/8" 12-1/4"x8- 12-1/4"2410 sx Class 'G', 1775 sx PF II 460 sx Class 'G' Uncemented Liner 39 sx Class 'G' 25. GRADE PACKER SET (MD/TVD) 26. 4-1/2" 12.6# 13Cr80 8607' DEPTH INTERVAL (MD)AMOUNT AND KIND OF MATERIAL USED PRODUCTION TEST27. Date First Production: Not on Production N/A Date of Test: Flow Tubing Press Oil-Bbl: Oil-Bbl: Gas-MCF:Water-Bbl: Oil Gravity - API (corr): Method of Operation (Flowing, gas lift, etc.): Gas-Oil Ratio:Choke Size: Water-Bbl: See Attached Open to production or injection?Yes No 524. If Yes, list each interval open (MD/TVD of Top and Bottom; Perforation Size and Number; Date Perfd): PIPE 118'36"30" 18-5/8"Surface 2004'24"9200 sx PermafrostSurface2004' 8508' / 7412' Gas-MCF: Production for Test Period Calculated 24 Hour Rate Hours Tested: Casing Press: 118' ACID, FRACTURE, CEMENT SQUEEZE, ETC. TUBING RECORD DEPTH SET (MD) Yes No 5Was hydraulic fracturing used during completion? Per 20 AAC 25.283 (i)(2) attach electronic and printed information ADL 028280 320-011 Other 12. SSSV Depth (MD/TVD): Ref Elevations BF Surface (attached) KB Form 10-407 Revised 3/2020 Sr Pet Eng Sr Pet Geo Sr Res Eng STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG Development Stratigraphic Test 2.Operator Name: 3.Address: P.O. Box 196612 Anchorage, AK 99519-6612 7. Date Spudded: 8. Date TD Reached: 9. 10. Plug Back Depth(MD/TVD): 4b. 4b. Location of Well (State Base Plane Coordinates, NAD 27): 57.10 Water Depth, if Offshore:13. N/A Zero API Number: Logs Obtained List all logs run and, pursuant to AS 31.05.030 and 20 AAC 25.071, submit all electronic data and printed logs within 90 days of completion, suspension, or abandonment, whichever occurs first. Types of logs to be listed include, but are not limited to: mud log, spontaneous potential, gamma ray, caliper, resistivity, porosity, magnetic resonance, dipmeter, formation tester, temperature, cement evaluation, casing collar locator, jewelry, and perforation record. Acronyms may be used. Attach a separate page if necessary 23. 18.Property Designation: 21.Re-drill/Lateral Top Window MD/TVD: 9647' / 8349' 1900' (Approx.) 5 Submit within 30 days of Completion, Suspension, or Abandonment By Samantha Carlisle at 3:11 pm, Jun 16, 2020 RBDMS HEW 6/18/2020 Abandonment Date 6/8/2020 HEW xGDLB 06/18/2020 7/1/2020MGR30JUN20 If yes, list intervals and formations tested, briefly summarizing test results. Attach separate sheets to this form, if needed, and submit detailed test information per 20 AAC 25.071. Permafrost - Base Formation at total depth: Contact Name:Worthington, Aras J Contact Email:Aras.Worthington@bp.com Authorized Name:Lastufka, Joseph N Authorized Title:SIM Specialist Authorized Signature with Date:Contact Phone:+1 907 564 4102 32. I hereby certify that the foregoing is true and correct to the best of my knowledge. INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. All laboratory analytical reports regarding samples or tests from a well must be submitted to the AOGCC, no matter when the analyses are conducted. Item 1a. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. Item 1b. Well Class Service wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disp, Water Supply for Injection, Observation or Other. Item 4b. TPI (Top of Producing Interval). Item 9. The Kelly Bushing and Ground Level elevations in feet above mean sea level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. Item 15. The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00). Item 20. Report true vertical thickness of permafrost in Box 20. Provide MD and TVD for the top and base of permafrost in Box 29. Item 22. Review the reporting requirements of 20 AAC 25.071 and, pursuant to AS 31.05.030, submit all electronic data and printed logs within 90 days of completion, suspension, or abandonment, whichever occurs first. Item 23. Attached supplemental records should show the details of any multiple stage cementing and the location of the cementing tool. Item 24. If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Item 27. Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-in, or Other ( explain). Item 28. Provide a listing of intervals cored and the corresponding formations, and a brief description in this box. Submit detailed description and analytical laboratory information required by 20 AAC 25.071. Item 30. Provide a listing of intervals tested and the corresponding formation, and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Item 31. Pursuant to 20 AAC 25.070, attach to this form: well schematic diagram, summary of daily well operations, directional or inclination survey, and other tests as required including, but not limited to: core analysis, paleontological report, production or well test results. 9758' 9802' 9883' 10006' 10087' 10401' 8446' 8488' 8567' 8688' 8764' 9002' Sag River Shublik Sadlerochit - Zone 4 CGL - Zone 3 Base of CGL - Zone 2 Zone 1 Zone 1 28.CORE DATA Conventional Core(s) Yes No 5 Sidewall Cores Yes No 5 If Yes to either question, list formations and intervals cored (MD+TVD of top and bottom of each), and summarize lithology and presence of oil, gas or water (submit separate sheets with this form, if needed). Submit detailed descriptions, core chips, photographs and laboratory analytical results per 20 AAC 25.071. Well Tested? Yes 10401'9002' Top of Productive Interval 10401'9002' Form 10-407 Revised 3/2020 Submit within 30 days of Completion, Suspension, or Abandonment 30. FORMATION TESTS29. GEOLOGIC MARKERS (List all formations and markers encountered): NAME MD TVD Permafrost - Top No 5 31. Summary of Daily Work, Photo Documentation, Wellbore Schematic DiagramList of Attachments: Information to be attached includes, but is not limited to: summary of daily operations, wellbore schematic, directional or inclination survey, core analysis, paleontological report, production or well test results, per 20 AAC 25.070. Joseph N Lastufka Digitally signed by Joseph N Lastufka Date: 2020.06.16 13:44:33 -08'00' ij`îŕŕ ĉ ¢ŕ .\ ,ëŕĨ5ŕ !,4ïŕŕ =>ŕ99]ŕ{=ŕ ŕ RUN@48<\» Í¿4!¼ ŕ ©©ŕooooŕª'ŕªĸŕœ @*\0C*0C*Xŕ !) ŕ ŕ '/ŕ =>ŕŕ>ŕ9]ŕ>ŕ ŕ % \ ) ÎÀ 4 Ŕ hhYYYYY½ hh /99]ŕ @*\0Zw0C *X Ĉ³ŕ,ļŃVŕ ŕ/ŕ =>ŕŕ>ŕ9]ŕ>ŕ W ¯ŕÏŕŕ /ŕ 99]ŕ@*\0Zw0C*Xŕ W ¯ŕŕŕ /ŕŕ Qŕ ŕŕ'.ŕČŕ!-Ġŕ ŕ 'ŕ jŕŕ'.ŕĎŕGŕ ŕ ŕ Bŕ^sŕ ( .sŕSŕO$sŕ ~ŕŕŕ ŕ Qŕ ŕ1ŕ.ŕSŕ "ŕ ŕ \ \ \ ŕŕ .ŕ9O(\67#71%:ŕ 9P(\67# :Tŕ !*\ "% % $ %# %%$% #%%% ò ;ŕ £$ŕ TŕIŕŕ%ŕ Aŕ gŕŕ ŕ Ùŕ äŕ ñŕ¹Œŕ³ŕ ŕ:"ŕVpA IAŕ Qŕŕ)ŕ ŕ5ŕ *\ Q¡) ŕ5ŕ *&\ ŕŕ .ŕ9O(\67#ŕ:Tŕ +*!\ ŕdqeŕ "ŕ ( QŕHŕĥŕ.ŕŕ 8ŕ ŕdqeŕ "ŕ ŕ )!!\ j(ŕ1ŕ.ŕŕ ûŕ "ŕ ŕ .\ jŕ%ŕŕOS$ŕc;Ĕğ¡1Sŕ IAŕ .!\ ŕ$ŕ(.ŕŕľŀŕ ŕdqeŕ ~ŕŕ ŕ .!\ Qŕ}Ŀ®ŕĦŕĩ1ŕ1ŕIAŕ .%!\ F5)ěb GŕUnn,-Ķŕ 5F)ŕ Nŕ cŕ nFnŕG5ŕGŕŕ ,GFŕ,bŕ bŕF5)Nŕ /ŕ G?WVNŕ5V¬VfŕW?ŕ f?« Ļ?ŕ!ŕ¬?fŕĽŌW?fĺpŁŕ±Vfōŕ«pWpŕ ăFŕ )ŕ GbF5İ,ŕ ňĹőŕ `bŕ Ěķŕ ŕ ŕ ŕ ŕ ŕ ŕŕ ŕ ŕ ŕ ŕ ŕ ŕ ŕŕ ŕ ŕ 7¦ŕ -6!ŕ đ#§ŕ 7¦ŕ #"\JPDBDH5F\9LF=TDK\uŕ $ $\H=S\PX\Ê&ŕ \IM;D9\ĞþìĢĜéĄŕ·óÂÓå¸ŕ &ŕ S5A?Y\HJT>0\ W=FF\5 HBF=2\$ 3\($\ \ \9CQG=\TV7DHB ú RUN@48<\¾)\öŕÿ lŕ^Ć¥ŕamPŕ¶LÔ2Lß2ÐLrŕ .\ )\ =Pŕ{=ŕamPŕ@*\0*à0C*Xŕ <mŕģPP|_ŕ=9{ŕ@*\0Zw0C*Xŕ .\ .!\Ø3DBD2Üll<^;$ << ^<P al¥^;ŕ \+ŕ(ŕ%ŕHŕ%:ŕ "ŕ ŕ \ ŕ%ŕ(ŕ%:ŕ "ŕ ŕ ))\+ŕ;}ŕ%ŕ Tŕ "ŕ ,ŕ ôŕ®-ŕ ŕ ŕ ðŕ ĭĖŕ 66ŕ ,1`ŕ ¤ĝŕ íŕ ŕ ŕ ŕ ŕ 'ŕ ŕ 4!ŕ ŕ !4ŕ ŕ ŕ ŕ ŕ 4!ŕ ŕ !4ŕ ŕ ŕ ' ŕ ŕ 4!ŕ ŕ !4ŕ ŕ ++'\ËÚMBZ0Cŕ÷|<ŕ>ŕRĒºŕR_âŕiÝZ ) )\ÌxHŕŕMB32[ŕOS$ŕ<BDŕė$tŕR_zŕDiLŕ ) \øMB32[;|<RatR_zDi3Dŕ ) \xMB32[ŕęŕĘõŕ @3[2DL23rŕ ) \xMŕSOŕmŕ=atŕR_zŕ3i3ŕ@L2[23Mrŕ *\+ '¢6 ŕüŕ )%\ ŕŕOĬŕ":¨ŕ6ŕ "ŕ ŕŕ ).\+ŕ;}ŕ%ŕ Tŕ "ŕ ŕ ŕ ŕ ŕ )!%\+ŕcŕ ~ŕŕ ( ykkŕ yãÞ×Òѵ +Hŕ ĕ$ŕ I/Aŕ E )!!\+ŕ(ŕ%ŕŕŕĪŕ ŕEEŕýŕ !%)!!\+(ŕ%ŕŕŕ7ŕ "EEŕ ykkŕ )!)\+ŕHŕO:ŕ$ŕ:Tŕ£$ŕ "ŕEŕ )%%\+(ŕ%ŕŕĀŕŕī²ŕ$ŕ;$ŕ "E .!\+ ŕ%ŕ ŕ%ŕ ŕ 'ŕ 'Hŕ# Ucċďcŕ A,\' /ŕ /ŕ \ ŕ¤,$ŕ1ù4 ²ŕŕ$ ) 1ŕU!ŕ IA ŕ-ŕ .ŕŕ1 'ŕd±eŕ ŕ j ŕ$ŕ .ŕŕħŕ (ŕ dqeŕ "ŕ ((ŕ !%. -6!ŕ 8ą8#ŕ 8ņ#ŕ 88į#ŕ #ŏ§ŕ 6ŕèuŕJ&Kŕ ,-)ŕJÄ v&Kŕ ŅĂŕ#ŕUŕJá&Kŕ -Į`ŕ!7¨ŕUāŕ ıNŕ )Ã!ŕ -#Ŋ?Nŕ´'ŕ , ŕ?Nŕ Áŕ / (\H=S\PX\&v&ŕ ĵÅ#êŕU`ŕgŕĤŕġĐŕJÕ&Kŕ ŕŕŕŕ5 ŕ /ŕ)ŕgŕ /ŕ)Ĵŕ - \IM;D91\Z[\SD;=TP6:E\A,\&&ŕ IJÆ8#ŕ %ŕÉŕŕJÖ&Kŕ &ŕ #ć81ŕ )Ċæ---ńŕ v&ŕ 8č#ŕ g7ŕJÛÇKŕ çēŕŐʼnł°ŋŎ°Ňŕ WWEL L NAME:F-04B 226.Ac i d , Fr ac t u r e, Cem en t Sq u eeze, Et c . Depth Interval (MD) Amount & Kind of Material Used 8490' - 8500' Tubing / Casing Punch 1529' 435 Bbls Class 'G' 1290' - 1300' Tubing / Casing Punch 1275' - 1285' Tubing / Casing Punch Surface 233.4 Bbls Class 'G' Surface 1.4 Gal Class 'G' ACTIVITYDATE SUMMARY 4/30/2020 ***WELL SHUT IN UPON ARRIVAL***(ELINE AD PERF FOR P&A) INTIAL T/I/O=0/0/0 GUN SPECS: 10' 2.0" HSD POWERFLOW HMX 6SPF 60 DEG PHASING CCL TO TS=9.25', TS TO BS=10.0', CORRELATE TO 4.5" TUBING TALLY DATED 9/12/2008. CCL STOP DEPTH=8480.7' PERFORATE 8490'-8500' PAD OP ALERT THAT PRESSURE IN OOA CAME UP, BLEED DOWN FINAL T/I/O/OO=0/0/400/400 ***JOB COMPLETED**** 5/6/2020 T/I/O = /-28/2 Temp - SI. LRS Unit 46 conduct circ out (PLUG and ABANDONMENT) Pumped 5 bbls 60/40, followed by 45 bbls of 160* FW w/ 2 gal F103and 2 gal UO67, followed by 417 bbls of 90* 9.8 brine down tbg, taking returns to OOT,s. IOOT= 360 bbls .OOOT= 160 bbls. Pumped 4 bbls 60/40 down Tbg and up IA taking returns to OOOT, to check IA communication as per WSL. Pumped an additional 11.5 bbls 60/40 down tbg, taking returns up OA to OOOT. Shut down, U-tube for 1 hour. Pumped 4 bbls 60/40 through all surface lines to OOOT for freeze protection. FWHP= 6/vac/vac. OOA = 162 psi. 5/9/2020 T/I/O= Assist w/ Cement Job (PLUG AND ABANDONMENT) Pumped 6 bbls 60/40 meth down Tbg taking returns from IA. Pumped 12.6 bbls 60/40 meth down Tbg taking returns from OA. Cementers pumped cement down Tbg taking returns first from the OA and then the IA. LRS pumped 22.4 bbls 9.8 NaCL down Tbg taking returns from IA. Pumped 22.4 bbls 9.8 NaCl down Tbg taking returns from IA. Flushed CT and hardline w/ brine. FWHP's=620/2/160/760 SV,WV,SSV= C MV= O IA,OA=OTG Block Valves=SI 5/9/2020 SLB Cementers - IA x OA Surface Cement Plug (PLUG AND ABANDONMENT) ***LRS in control of well upon arrival. See LRS WSR 05-09-20 for more details*** LRS Pumped 6 bbls 60/40 down TBG with IA returns to verify flowpath, 18 bbls 60/40 down TBG with OA returns to verify flowpath. SLB Pumped the following down TBG with OA returns: 10 bbls freshwater spacer, 435 bbls 15.8 ppg class G CMT, clean cement returns verfied at surface. SLB pumped the following down TBG with IA returns to OTT: 230 bbls 15.8 ppg class G CMT, 2.5 bbls freshwater, dropped 7" foam ball, 2.5 bbls freshwater. LRS displaced with 22.4 bbls 9.8 ppg NaCl. Cement did not reach surface in IA. ***LRS in control of well upon departure*** Est. TOC in OA at surface Est TOC in IA near surface Est. TOC in TBG @ 1800' MD Est. BOC in T/IA/OA @ 8500' MD 5/11/2020 T/I/O/OO = SSV/Vac/Vac/Vac. Temp = SI. WHPs (FB request, post P&A). No wellhouse or flowlines. Temp scaffolding installed around well. Opened IA & OA CVs, OOA CV is already open. SV, WV, SSV = C. MV = O. IA, OA, OOA = OTG. 11:20 5/12/2020 Cost placeholder for foam wiper balls 5/15/2020 Job Scope: Tag TOC in IA. T/I/O/OO = SSV/Vac/Vac/0. Temp = SI. T. Opened IA (vac) and vented 1 hr. Tag @ 19' ( fill-up volume 1.1 bbls) 5/15/2020 ****WELL S/I ON ARRIVAL****(P&A) R/U SLICKLINE ****CONT WSR ON 5-16-20**** Daily Report of Well Operations PBU F-04B Daily Report of Well Operations PBU F-04B 5/15/2020 (LRS Unit 70: Assist SL - AOGCC MIT-T) Rig up and Pressure Test ***WSR Continued on 05/16/2020*** 5/16/2020 ***WSR Continued from 05/15/2020*** T/I/O= 15/0/0 Temp= NA (LRS Unit 70: Assist SL - AOGCC MIT-T) Pre-AOGCC MIT-T to 2561 psi ***PASSED*** Target Pressure= 2500 psi - Max Applied= 2750 psi Pumped 1 bbls of Crude down TBG to achieve a test pressure of 2694 psi. 1st 15 minute loss of 99 psi, 2nd 15 minute loss of 34 psi, for a total loss of 133 psi in 30 minutes. Bled TP down to 20 psi, bled back ~0.84 bbls. (Austin McLeod) State Witnessed AOGCC MIT-T to 2526 psi ***PASSED*** Target Pressure= 2500 psi - Max Applied= 2750 psi Pumped 1.3 bbls of Crude down TBG to reach test psi 1st test 1st 15 minute loss of 127 psi, 2nd 15 minute loss of 32 psi, for a total loss of 159 psi in 30 minutes. Bled TP down bled back ~1 bbl SL in control of well upon departure - CVs OTG - Tags hung on SV Final WHPs=19/vac/vac 5/16/2020 T/I/O= Temp=SI Assist Sline (PLUG AND ABANDONMENT) Pumped a total of 4.9 bbls down TBG into OOA to verify Communiction after TBG punch. (SEE LOG FOR DETAILS) Bled TBG to 12 psi. SSL In control of well upon LRS departure. IA/OA/OOA=OTG FWHP's=0/0/0/0 5/16/2020 ****CONT WSR FROM 5-15-20****(P&A) LRS PERFORM PASSING MIT-T TO 2500 psi **see LRS log for details** DRIFT W/ 3' 2-1/8" STEM, 2.50" S-BAILER TO TOC @ 1529' SLM.(recovered cement, aogcc witnessed, Austin McLeod) LRS PERFORMED PASSING MIT-T TO 2526psi.(aogcc witnessed, Austin McLeod) DRIFT TBG W/ 11' x 2-1/2" DUMMY GUNS(2.66" rings) TO TOC @ 1529' SLM. RAN SLB 10' x 2-1/2" HSD PowerFlow 2506 HMX GUNS(6spf, 60* phase), PERF TBG @ 1290'-1300' MD.(no OOA communication) LRS CONFIRMED NO TBG/OOA COMMUNICATION. RAN 10' x 2-1/2" HSD HyperJet 2506 HMX GUNS, PERF TBG @ 1275'-1285' MD.(tbg pressure dropped 15psi, no communication) LRS CONFIRMED TBG/OOA COMMUNICATION. ****WELL LEFT S/I ON DEPARTURE, DSO NOTIFIED**** 5/18/2020 T/I/O/OO=5/0/0/90 Circ Tbg x OOA to Brine (P & A) Pump 20 bbls 160* diesel, 50 bbls surfactant, & 190 bbls 9.8# brine down tbg taking returns up OOA to flowback tanks. Pumped 1.5 bbls brine to pressure up on TBG & OOA to verify IA has NO communication. Pumped 14 bbls 9.8# brine down OOA returns up tbg. Pump remaining 9.8# brine (76 bbls) down Tbg returns up OOA to tank. *See log for circulation rates* FWHPs=20/4/0/5 Daily Report of Well Operations PBU F-04B 5/20/2020 SLB Cementers TxOOA Surface Cement Plug (PLUG AND ABANDONMENT) ***SLB took took control of well upon arrival*** SLB Pumped 5 bbls 60/40 down tubing with returns out the OOA to test injectivity. SLB pumped the following down the tubing taking returns out the OOA through the choke skid to Otts: 5 bbls fresh water, & 233.4 15.8 ppg Class G Cement. ***SWAB, SSV, OOA CSG Valve shut in upon departure*** Est. TOC in TBG @ ~0' MD Est. TOC in OOA @ ~0' MD Est. BOC TBG/OOA @ 1300' MD 5/30/2020 T/I/O/OO=0/0/0/0 Removed upper tree, installed tree cap bonnet onto Master valve. Torqued to API specs. Removed IA, OA, and OOA. Installed integrals with 1502 caps. Torqued to API specs. FWP's 0/0/0/0 see log for details. 6/3/2020 P&A **In Progress** Dug excavation to 15' below pad grade, install shoring box. Cut wellhead and found IA & OA annuli voids. Strapped IA at 7', OA at 25'. Well is cut approx 6.3' below tundra but will confirm on 6/4 with state witness of annular void prior to cement top job 6/4/2020 P&A **In Progress** AOGCC (Bob Noble) witnessed IA & OA annular voids needing cement top job. Voids = 1.37 bbls. IA=7', OA=25'. Mix 15.8 ppg AS-1 and top off IA and OA to surface 6/8/2020 P&A ** Job Complete** State witnessed top of cement by Bob Noble. Weld Marker plate to top of cut casing. Pad elevation = 40.8'. Tundra elevation = 35.0'. Wellhead cut elevation = 28.3'. Wellhead is cut 6.7' below tundra grade. Pull shoring box and backfill excavation. 233.4 bbls. MEMORANDUM TO: Jim Regg �� �• 6/ /I�1 P. I. Supervisor FROM: Bob Noble Inspector State of Alaska Alaska Oil and Gas Conservation Commission DATE: 6/8/2020 SUBJECT: Surface Abandonment PBU F -04B - BPXA PTD 2100870; Sundry 320-011 6/4/2020: 1 traveled to PBU F -04B. On arrival I met with BP representative Jon Arend and inspected the well which was cutoff 6.7 feet below tundra grade. There was 7 feet of void in the IA (4 1/2" x 9 5/8" casing annulus) and 25 feet of void in the OA (9 5/8" x 13 3/8"). 1 instructed Jon to fill them up with cement and call when they had good hard cement to surface 6/7/2020: 1 returned to the well and again met with Mr. Arend. I inspected the cut off and found all string full of good hard cement. The marker plate has all the correct markings except the PTD was missing the 0 at the end. I ask them to put it on when welding the plate on. The plate had no overhang. - Attachments: Photos (3) 2020-0607—Surface—Abandon PBU F -04B bn.docx Page I of 3 O n CD O O N 0 a m(1) 14 7; O p li Z W L CL o I 0 .+ W C C- N � cU oU C7 �o Q T y O N 0 O N 3 t � v)aco MEMORANDUM Founded on State of Alaska Depth To MW Above Alaska Oil and Gas Conservation Commission TO: Jim Regg 2pa� S`20l p P. I. Supervisor DATE: May 16, 2020 9.8 ppg Wireline tag ' 0 SUBJECT: Well Bore Plug & Abandonment Prudhoe Bay Unit F -04B FROM: Austin McLeod BP Exploration (Alaska) Inc Petroleum Inspector PTD 2100870; Sundry 320-011 Section: 2 Township: 11N - Range: 13E Meridian: Umiat - Drilling Rig: NA Rig Elevation: NA Total Depth: 11,681 ft MD Lease No.: ADL 028280 Operator Rep: Jerry Boyles Suspend: NA P&A: X Casing/Tubing Data (depths are MD): Casing Removal: Conductor: 30" O.D. Shoe@ 118 - Feet Csg Cut@ NA Feet Surface: 18-5/8" - O.D. Shoe@ 2,004 Feet Csg Cut@ NA Feet Intermediate 1: 13-3/8"x9-5/8" O.D. Shoe@ 9,312 - Feet Csg Cut@ NA Feet Intermediate 2: 9-5/8"x7" "O.D. Shoe@ 9,647 - Feet Csg Cut@ NA Feet Liner 1: 3-1/2"x3-3/16"-O.D. Shoe@ 9,760 Feet Csg Cut@ NA Feet Liner 2: 2-3/8" O.D. Shoe@ 11,679 Feet Csg Cut@ NA Feet Tubing: 4-1/2" O.D. Tail@ 8,607 Feet Tbg Cut@ NA Feet Plugging Data Type Plug Founded on Depth Btm Depth To MW Above Verified Fullbore Bottom 8,531 ft MD ' 1,529 ft MD' 9.8 ppg Wireline tag ' 0 0 Test Data: Initial 15 min 30 min 45 min Result Tubing 2685 2558 2526 IA 0 0 0 P OA 0 0 0 Remarks: I traveled to F -04B to witness the tag and pressure test (MIT -T) of a cement plug that was pumped on 5/9/20. The inner and outer annuli had been cemented to surface with the proposed top in the tubing at 1,800 ft MD. BP's schematic shows the bottom of the plug in the tubing to be at 8,400 ft MD, but with the plugged x -nipple at 8,531 ft MD I called the bottom depth just that (referred to as bottom in plugging data). We found the top of the cement plug at 1,529 ft MD (4 barrels high) with the 200 pound, 2-1/2" sample bailer slickline string. Minimal inclination at that depth. We then completed a passing pressure test to a target of 2500 psi. With no variables, the first 15 -minute interval seemed like a higher than expected pressure loss, but proved out on the next 15 -minute check. I credited the fairly large drop to the pump truck operator getting to pressure too quickly. The bailer was then broke down with a good cement sample observed. Attachments: none I rev. 11-28-18 2020-0516_Plug_Verification_PBU_F-04B_am Perforation Depth: Measured depth: 10680 - 11660 feet True vertical depth: 9050-9045 feet Tubing (size, grade, measured and true vertical depth) Packers and SSSV (type, measured and true vertical depth) 12. Stimulation or cement squeeze summary Intervals treated (measured): 4-1/2" 12.6# 13Cr80 16-8607 16-7494 4-1/2" Baker S-3 Perm Packer 8508 7412 Treatment descriptions including volumes used and final pressure: No SSSV Installed 13. Representative Daily Average Production or Injection Data Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: 108 8023 10 0 140 Subsequent to operation: Shut -In 0 0 14. Attachments: kequiretl "1 20 MC 221 070.25.071. s 25.28211 15. Well Class after work: Daily Report of4lyell Operations 0 Exploratory ❑ Development 0 Service ❑ Stratigraphic ❑ Copies of Logs and Surveys Run ❑ 16. Well Status after work: Oil 0 Gas ❑ WDSPL ❑ Printed and Electronic Fracture Stimulation Data ❑ 1 GSTOR ❑ WINJ ❑ WAG ❑ GINJ ❑ SUSP ❑ SPLUG ❑ 17. 1 hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt: 318567 Authorized Name: Haffener, Jordan Contact Name: Haffener, Jordan Authorized Title: /Production Engineer ® Contact Email: Jordan.HaffenerAbp.com Authorized Signature! /n4�iV A� _ Date: al f . /y..— Contact Phone: +19075645383 Form 10-404 Revised 04/2017 [K.&K�/„�` ( RBDMS'J54AN 2 4 2019 Submit Original Only STATE OF ALASKA v "ECENLU ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS AN 2 3 2010 1. operations Performed Abandon ❑ Plug Perforations ❑ Fracture Stimulate ❑ Pull Tubing ❑ Operations sh =C 10,Suspend Cl Perforate ❑ Other Stimulate ❑ Alter Casing ❑ Cnange Cmc ❑ Plu for Retlnll ❑ Perforate New Pool ❑ Plug Re pair Well ❑ Re-enter Susp Well ❑ Other: Sewne Weill/Schon nn 0 Plug 2. Operator Name: BP Exploration (Alaska), Inc 4. Well Class Before Work Development 0 Exploratory ❑ 5. Permit to Drill Number: 210-087 3, Address: P.O. Box 196612 Anchorage, AK 99519-6612 1 Stratigraphic ❑ Service ❑ I B. API Number: 50-029-20089-02-00 7. Property Designation (Lease Number): ADL 028280 8. Well Name and Number: PBU F -04B 9. Logs (List logs and submit electronic and printed data per 20AAC25.071): 10. Field/Pools: PRUDHOE BAY. PRUDHOE OIL 11. Present Well Condition Summary: Total Depth: measured 11681 feet Plugs measured 8531 feet true vertical 9045 feet Junk measured 8531 feet Effective Depth: measured 8531 feet Packer measured 8508 feet true vertical 7431 feet Packer true vertical 7412 feet Casing: Length: Size: MD: TVD: Burst: Collapse: Conductor 96 30" 23 -118 23-118 Surface 1982 18-5/8" 22-2004 22-2004 930 870 Intermediate 9292 13-3/8" x 9-5/8" 20-9312 20-8075 4930 / 3450 / 6870 2670 / 1950 / 4760 Intermediate 9629 9-5/8" x 7' 18-9647 18-8349 6870 17240 18160 4760 / 5410 / 7020 Liner 1209 3-1/2" x 3-3/16" 8551 -9760 7448-8448 10160 10530 Liner 3139 2-3/8" 8540-11579 7438-9045 11200 11780 Perforation Depth: Measured depth: 10680 - 11660 feet True vertical depth: 9050-9045 feet Tubing (size, grade, measured and true vertical depth) Packers and SSSV (type, measured and true vertical depth) 12. Stimulation or cement squeeze summary Intervals treated (measured): 4-1/2" 12.6# 13Cr80 16-8607 16-7494 4-1/2" Baker S-3 Perm Packer 8508 7412 Treatment descriptions including volumes used and final pressure: No SSSV Installed 13. Representative Daily Average Production or Injection Data Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: 108 8023 10 0 140 Subsequent to operation: Shut -In 0 0 14. Attachments: kequiretl "1 20 MC 221 070.25.071. s 25.28211 15. Well Class after work: Daily Report of4lyell Operations 0 Exploratory ❑ Development 0 Service ❑ Stratigraphic ❑ Copies of Logs and Surveys Run ❑ 16. Well Status after work: Oil 0 Gas ❑ WDSPL ❑ Printed and Electronic Fracture Stimulation Data ❑ 1 GSTOR ❑ WINJ ❑ WAG ❑ GINJ ❑ SUSP ❑ SPLUG ❑ 17. 1 hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt: 318567 Authorized Name: Haffener, Jordan Contact Name: Haffener, Jordan Authorized Title: /Production Engineer ® Contact Email: Jordan.HaffenerAbp.com Authorized Signature! /n4�iV A� _ Date: al f . /y..— Contact Phone: +19075645383 Form 10-404 Revised 04/2017 [K.&K�/„�` ( RBDMS'J54AN 2 4 2019 Submit Original Only Daily Report of Well Operations PBU F -04B ACTIVITYnATF ci inARAAOV 12/29/2018 "'WELL S/I ON ARRIVAL*** (Profile modification) TAG 45KB LTP W/ 4-1/2" X-CATHER @ 8,539' SLM / 8,540' MD SET 4-1/2" X -CATCHER IN 4-1/2" X -NIPPLE @ 8,517' SLM / 8,531' MD PULL BK-DGLV FROM ST#2 (6,631' MD) & BK-LGLV FROM ST#3 (3,410' MD) SET BK-DGLV IN ST#3 (3,410' MD) LRS LOADED IA W/ 232 BBLS CRUDE ***JOB IN PROGRESS, CONTINUED ON 12/30/18 WSR*** ***' Job continued from 12/29/18 ***** (LRS Unit 46 - Assist Slickline: Load & Test) Pumped 2 bbls of 60/40 MW followed by 196 bbls of 100* crude down TBG to load. Pumped 7 bbls crude down TBG to check set plug MIT -T PASSED to 2882 psi Max Applied psi= 3000 psi Target Pressure= 2500 psi. Pressured TBG to 2982 psi with 2.5 bbls crude. MIT -T lost 73 psi in the 1 st 15 min and 27 psi in the 2nd 15 min for a total loss of 100 psi during 30 min test. Bled TBG pressure to 427 psi . Recovering around -5 bbls. SSL in control of well upon LRS departure.. Tags hung. AFE sign on MV. IA/OA= OTG 12/30/2018 Final WHP's 427/37/0/0. 'CONTINUED FROM 12/29/18 WSR*"(secure well) SET BK-DGLV IN ST#2 (6,631' MD) PULLED X -CATCHER FROM X -NIPPLE @ 8,531' MD LRS LOADED TBG W/ 196bbls OF CRUDE SET 4-1/2" PX PLUG BODY & PRONG @ 8,531' MD LRS PERFORMED SUCCESSFUL MIT- 2, psi 12/30/2018 'WELL S/I ON DEPARTURE, DSO NOTIFIED OF WELL STATUS*** TRIBE = cIw WELLHEAD= WEVOY ACTUATOR= —BAKER C KB. ELEV = 57.1' BF. ELEV = 39.17- KOP= _ 3000 Max Angle = )6' (x31081Z Datum MD= 10193' Datum TVD = 8B00'SS 13-3/8" CSG, 72#, N -BO BTRS, ID = 12.347" H 1934' -51W CSG, 47#, NT -80S, NSOC, D = 8.681" 18-5/8" CSG, 96.5#, K55 BTRS, D = 17.655" 2004' 13-3/8" CSG, 68#, K-55, D = 12.415'2022' 4 -12 -TM 12.6#, 13CR-80 VAM ACE XO 13CR-80 VAM TOP F-04SAFETY NOTES: WELL ANGLE> 70° @ 10487' "' 4-1/2" CHROME TLIONG- Minimum ID = 1.780" @ 8573' 2.70" BTT DEPLOYMENT SLEEVE PKR SLP (1' X 1.5") 8 2 SFAUNG NTS' -4' T x 3.7D- ODE ea)- (8/17/14) TOP OF 3-1/2- LNR 855W TOPTOP OF�� 4-1/2"713G. 12.6#, 13CR-80 VAM TOP, h 8605- .0152 605.0152 bpf, D = 3.958 i 76H I -R0 L74S 9787 hnf D = R 776' =8.681* I-1 9312' X T BKR VVFPSTOCK 3-3/16- LW 6.2#, L-80 TCI, .0076 bpf, D = 2.80' - 1946' 1-113-3/8- SAASCH ROSS CSG PATCH 2027 13-3/8'X9-5/8' 208$' 4-12" HfrS X NAP, D = 3.813" GAS LET MANDRELS ST PERFORATION SUMMARY TV REF LOG: SVVS MEPA CN JGR ON 0820110 TYPE ANGLE AT TOP FEW 94' @ 10680 Note: Refer to Production OB for historical pert data SIZE SFE I INTERVAL Opn/Sgz SHOT SOZ 1.56- 6 10680 - 11010 O 0&20110 2 1.56" 6 11060 - 11200 O 0&20110 BK 1.56' 6 11460 - 11660 O 08120/10 35 3-3/16- LW 6.2#, L-80 TCI, .0076 bpf, D = 2.80' - 1946' 1-113-3/8- SAASCH ROSS CSG PATCH 2027 13-3/8'X9-5/8' 208$' 4-12" HfrS X NAP, D = 3.813" GAS LET MANDRELS ST MD TV DEV TYPE I VLV I LATCHI PORT DATE 3 3410 3387 23 KBG-2 OM1' BK 0 12!30/18 2 6631 5919 39 KBG2 DMf BK 0 12130/18 1 8418 7338 35 KBG-2 DVN BK 0 09/12/08 848T Fi 4-112' HES X NP, D=3.813' 8508' T X 4-117 BKR S-3 FKR, D = 3.870' 6531' 4-1/7 HESX NP, D=3.813' 8531' -14-1/2" PX PLl1C, (12130/18) 8540 45 KB LTP, D =1.81' (08128114) 855W 3.70" DEPLOY SLV, D= 3.00' 8573' 2.70' BTT DEPLOY SLV, D = 1.78D- 8607- 114-12- WLEG, D = Ll--: BE} -IND 9-518" X 7' LTP, D=?? CT LNR 9-5/8" X 7' SEAL ASSY, D=?7 7" BOT LNR TOP PKR, ID = ? 9-5/8' X 7" TIW LTPw /LNR HCl{ ID I' 31/2' X 3-3/1"0 D 7"MLLOUT VMDOW (F-046) 9647'-9655' 10�—) 2-38"MARKEIR JOINT ORIFICE SUB 1 11672' HPBTDI LNR 4.70#, L-80 STL, .0039 bpf, D = 1.99T H 11679' DATE REV BY COMMENTS DATE REV BY COMMF3NM 06/26176 ORIGFNALCOMPLEl1ON 0726/18 ZV/A U GLV GO (07/20118) 07/10187 N1ES RIND 10/01/18 MSIJM) SET POLAR CHOKE (0929/18) 03103103 CTD SHOETRACK(F-04A) 01107/19 JUJMD SET PX PLUG 8 GLV C(O (12130118) 09/14106 MMES FWVO 08/22/10 CTDSIDETRACK(F-04B) 1124110 SWPJC RNAL DRLG COW -E -U NS P RLDHOE BAY LMT WELL F -04B Pf38V IT No: "2100870 AR No: 50-029-20089-02 SEC 2, T11 K R13F 2308' FSL 8 2396' ML BP Bcplora0on (Alaska) THE STATE 0fALAS- A GOVERNOR MIKE DUNLEAVY Aras Worthington Interventions and Integrity Engineer BP Exploration (Alaska), Inc. PO Box 196612 Anchorage, AK 99519-6612 Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, PBU F -04B Permit to Drill Number: 210-087 Sundry Number: 320-011 Dear Mr. Worthington: Alaska Oil and Gas Conservation Commission 333 West Seventh Avenue Anchorage, Alaska 99501-3572 Main: 907.279.1433 Fax: 907.276.7542 w .00gcc.olasko.gov Enclosed is the approved application for the sundry approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the AOGCC grants for good cause shown, a person affected by it may file with the AOGCC an application for reconsideration. A request for reconsideration is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. Sincerely, J e Price Ch DATED this &day of January, 2020. 3BDMS!L4'JAN 2 4 2020 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS 20 AAC 25.260 U v ORIGINAL '&��flz2v Submit Form and Form 10-403 Revised 04/2017 ll Approved application is valid for 12 months from the date of approval. Attachments in Duplicate 1. Type of Request: Abandon 0 • Plug Perforations ❑ Fracture Stimulate ❑ Repan -Well ❑ Opera rtions sfiut6dvin Suspend ❑ Perforate ❑ Other Stimulate ❑ Pull Tubing ❑ Change ,Ce rp.(7 Plug for Rednll � #`»�) ❑ Perforate New Pool ❑ Re-enter Susp Well ❑ Alter Casing ❑ Other � ``33e�..❑❑ 2. Operator Name: BP Exploration (Alaska), Inc 4. Current Well Class: Exploratory ❑ Development 0. 5. Permit to Drill Number: 210-087 3. Address: P.O. Bax 196612 Anchorage, AK 99519-6512 Stratigraphic ❑ Service ❑ 6. API Number: 50-029-20089-02-00 . 7. If perforating: What Regulation or Conservation Order governs well spacing in this pool? 8. Well Name and Number: Will planned perforations require a spacing exception? Yes ❑ No 10 PBU F -04B 9. Property Designation (Lease Number): 10. TO. ADL 028280 ' PRUDHOE BAY, PRUDHOE OIL 11. PRESENT WELL CONDITION SUMMARY Total Depth MD (ft): Total Depth TVD(ft): Effective Depth MD: Effective Depth TVD: MPSP (psi): Plugs (MD): Junk (MD): 11681 - 9045 - 8531 7431 8531 Unknown Casing Length Size MD TVD Burst Collapse Conductor 96 30" 23-118 23-118 Surface 1982 18-5/8" 22-2004 22-2004 930 870 Intermediate 9292 13-3/8" x 9-5/8" 20-9312 20-8075 4930 / 3450 / 6870 2670 / 1950 14760 Intermediate 9629 9-5/8" x 7" 116 - 9647 18 -8349 6870 / 7240 / 8160 4760 / 5410 17020 Liner 1209 3-1/2" x 3-3/16" 8551 - 9760 7448 - 8448 Liner 3139 2-3/8" 8540-11679 7438-9045 1 11200 11780 Perforation Depth MD (ft): Perforation Depth TVD (ft): Tubing Size: Tubing Grade: Tubing MD (ft): 1 10680- 11680 9050 - 9045 4-1/2" 12.6# 13Cr80 16-8607 Packers and SSSV Type: 4-12" Baker S-3 Penn Packer Packers and SSSV MD (ft) and TVD (ft): 8508/7412 No SSSV Installed No SSSV Installed 12. Attachments: Proposal Summary 0 Wellbore Schematic El 13. Well Class after proposed work: Detailed Operations Program ❑ BOP Sketch ❑ Exploratory ❑ Stratigraphic ❑ Development 0 - Service ❑ 14. Estimated Date for Commencing Operations: March 1, 2020 15. Well Status after proposed work: Oil ❑ WINJ ❑ WDSPL ❑ Suspended ❑ 16. Verbal Approval: Date: GAS ❑ WAG ❑ GSTOR ❑ SPLUG ❑ Commission Representative: GINJ ❑ O ❑ Op Shutdown Abandoned 4 • 17. 1 hereby certify that the foregoing is true and the procedure approved herein will not Contact Name: Worthington, Aras be deviated from without prior written approval. Contact Email: Aras.Worthington@bp.com Authorized Name: Worthington, Aras Contact Phone: +1 907 564 4102 Authorized Title: Interventi ntegnty E 'neer Authorized Signature: Date: /Az� .170 COMMISSION USE ONLY Conditions of approval: Notify Commission so that a representative may witness Sundry tuber: / Mechanical Plug lnte my f�j BOP Test ❑ ln`t*egnty Test [➢� Location Clearance Other: h.m9..� Al ��J� r•S �? P5C0-1 �3 ^'� CXy' IBDW JAN 2 4 2020 Post Initial Vection MIT Req'd? Yes ❑ No ❑ Spacing Ex tion Required? No Subsequent Form Required: j /nV r q c /`•1_ N APPROVED BYTHE ��//Q 0 Approved by: COMMISSIONER COMMISSION Date W U v ORIGINAL '&��flz2v Submit Form and Form 10-403 Revised 04/2017 ll Approved application is valid for 12 months from the date of approval. Attachments in Duplicate F-04 P&A Intervention Engineer Aras Worthington (907) 564-4102 Production Engineer Jordan Haffener (907) 564-5833 Expected Start Date March 1, 2020 History F-04 was completed with a three -string casing design in 1976. The outer casing string is set @ 2004' MD which is very near the permafrost. GWO has determined that these wells are at risk for sudden S— wellhead movement, as demonstrated by 02-03A and 02-02A. As such BP has decided the well will be plugged and abandoned to mitigate HSSE consequence associated with this potential risk. The well is secured with a Tubing Tail Plug with a passing CMIT TxIA to 2500 psi on 5/26/2019, a passing MITT to 2882 psi on 12/30/2018, and a passing CMIT OAxOOA to 600 psi on 2/24/2010. Objective Place abandonment cement plugs in the wellbore, excavate and cut and cap the well 3' below ' original tundra and backfill. Procedural steps E-line/Fullbore 1. Perforate at 8400' MD through the 4-1/2" tubing and 7" casing. 2. Circulate down tubing and up OA with surfactant wash followed by 9.8 ppg brine. Maximum tubing pressure 2500 psi. Note that the IA has already been circulated to 9.8 ppg brine. ➢ 5 bbls MEOH ➢ 50 bbls hot (160 deg) freshwater+ surfactant; 2 gal/mgal F103 and 2 gal/mgal UO67 412 bbls 9.8 ppg brine 3. RU Cementers. Circulate down tubing and up OA with cement then swap to taking returns from IA with cement. This step will cement the OA and IA to surface. Maximum tubing pressure 2500 psi. ➢ 5 bbls MEOH ➢ 655 bbls cement per design (-40 bbls excess); Take returns from OA until good cement returns are seen then swap to taking returns from IA until out of cement. ➢ 2 bbls FW ➢ Drop foam wiper ball ➢ Chase ball with 25 bbls 9.8 ppg brine to displace TOC to MD. Fullbore 1. AOGCC Witnessed MITT to 2500 psi target pressure. Max pressure 2750 psi. Slickline 1. AOGCC Witnessed Tag TOC. Eline/Slickline 1. Perforate from 1290'— 1300' MD through the 4-1/2" tubing, 9-5/8" casing, and 13-3/8" casing. Fullbore 1. Pump down tubing taking returns from the OOA the following (note that he 13-3/8" x 18-5/8" annulus has been displaced to dry crude during a RWO in 1987). Max tubing pressure 1500 psi. ➢ 20 bbls hot (160 deg F) diesel ➢ 50 bbls hot (160 deg F) freshwater + surfactant; 2 gal/mgal F103 and 2 gal/mgal UO67 ➢ 190 bbls hot (160 deg F) 9.8 ppg brine 2. Pump cement job down tubing with returns from OOA. The top of cement planned to beat surface in the OOA and the tubing. Maximum tubing pressure 1500 psi. ➢ 5 bbls MEOH ➢ 3 bbls FW spacer ➢ 220 bbls cement per design (-30 bbls excess) Cement Type/weight: Class G 15.8 ppg mixed on the fly. Field blend to be =lab ppg +/- 0.1 ppg Slurry Temperature: between 80° and 110°F BHST: 170°F 18-5/8" x 13-3/8" annulus to Fluid Loss: 40-200cc (20-100cc/30 min) 96.5# x 13- Compressive Strength: 2000 psi in 48 hrs. Thickening Time: Minimum 7 hours Surface Volume Calculations: volume top MD bot MD Size ID hhlc/ff Ft hhlc 18-5/8" 17.655" 18-5/8" x 13-3/8" annulus to 96.5# x 13- x 1300' MD Surface 1300' 3/8" 72# 13.375" 0.129 1300' 168 12.347" 13-3/8" 72# x 13-3/8" x 9-5/8" Surface 2000' x 9-5/8" 47# 9.625" 0.0581 2000' 116 9-5/8" 47# x 8.681" 9-5/8" x 7" annulus 2000' 8400' 7" 26# x 7" 0.0256 6400' 164 9-5/8" 47# x 8.681" 9-5/8" x 4-1/2" annulus Surface 2000' 4-1/2" 12.6# x 4-1/2" 0.0535 2000' 107 7" 26# x 4- 6.276" 7" x 4-1/2" annulus 2000' 8400' 1/2" 12.6# x 4-1/2" 0.0186 6400' Al2 4-1/2" tubingSurface 8400' 4-1/2" 12.6# 3.958" 0.0152 8400' Special Projects 1. Excavate and Cut off all casings and wellhead 3' below original tundra level. Top job all annuli and tubulars with cement as needed. Install marker cap on outermost casing string (conductor, if present). Provide a minimum of 24 hours notice to AOGCC Inspector of the timing of welding the marker plate onto the casing stub. Photo document the condition of the tubular stub immediately after cutting the wellhead, after topping off with cement (if necessary), and after installing the marker plate. 2. Bead weld marker cap on outermost casing string (30" Conductor) to read as follows and photo - document: BP Exploration Alaska, Inc. F -04B PTD # 210-087 API # 50-029-20089-02 4 TT4Sr= CON VMFILIEAD= FEWORATON SL#AMRY ACTUATOR= 6AK"E DATE AW.LE AT TOP PERF: 94" @ 10680' BF. ELEV 39.17' 57F Mi9ZJAL _R_P—V30O0Y MmAngle= W@lDB12' cw-Umwa—mw 6 10660 - 11010 �mTVO= . .Bop SsR 845, F-04 Current Status 7W@104T 112" CHROME TUBING" fh inimum ID =1.780" @1 8573' 12.70" BTT DEPI_t3YMENIE] FISH - PKRSLP (4" x 1.5') & 2 SEALM€'s ELDA3 5'-4"Tx3.74"ODEa3-(&17114) 28a, L-80 479, .0076 W. D= 2.84" ' 1338' x i>-58' xD, O = 8.581' GAS LFTM4NUMS FgTT—wTTvD7 FEWORATON SL#AMRY DEV I TYPE fIffLOG: SM WIN CI t1GR CN 0&2&10 DATE AW.LE AT TOP PERF: 94" @ 10680' Nolo: Rater b ROdUC6on 10 for hislorcal Part &U SIZE 57F Mi9ZJAL OpnGgz SEDT I SOZ- 1.56' 6 10660 - 11010 C 0820110 $41$j 7338. 1.66' 6 11060 -11200 C 0&2&10 1.56' 0 114OD -11660 C 0626/14 .0076 W. D= 2.84" ' 1338' x i>-58' xD, O = 8.581' GAS LFTM4NUMS FgTT—wTTvD7 REV BY DEV I TYPE I VLY LATCF7 PORT DATE 9 3410133$7 23 KH&2 DRtY BK p 1219OP1$ 2 8831( 5618 39 193& DMY BK 0 1213011$ 1 $41$j 7338. 35 KDO-2 DI14Y BK 0 O&2F&19 U-11 x SENO CT LNR 7" mi LOIIT VYFIICw ("" DATE REV BY COWA 9TS [TE REV BY COMAENTS 06/26176 ORMIMALCOMPLETION 07 IS ZVIAU GLV CIo(0712&18) 8711&&7 MES F&VO 1010111$ RISLMD SFT PMR CHOKE (M9118) 03103143 C CTD SIDEMCK(F-61A) MWfl9 .Il1" 'SFT PX FLOG B GLV 00 S t2MIS) 09114!08 WES RMYII D&05HB , UJ -M -D GLV M(DWIV19) 0872114 =Lsl k7RACK F 11124110 SAONP FNAL OFic COFi�.RX3h6 PRLDHOE SAY LW VVRL: F.048 Fm4r No. 2100870 AR Na: 54025-20059-02 Tl lK R13F, 2306' F'SL & 2306' 13P EipWalbn (Alaska) VVLIAHGD= MOEVVY ACTUAT0R= BAKER 08128/78 BF-QEV= 39.1T K0P= _ 3000' Mu Angle 98" 10812' 00=k0• 10193' Dak nTVD=. ,... BBDO' SS CEG 47N, wwls. K55 BTRS. Drilling (original) Cement: 9-5/8" Casing: est. 2022' MD - 9312' MD min, 73' p 7tl.. DPZ 1: SLEEVE 1931' MD - 6824' MD Ulm 470, DPZ 3: 9758' MD — 10,537' MD 'M.7 6 11101513-112001 C 8 114OD-11880 C F-04 P&A Status FET'NOTES, WaLANGiE>79'01048r aim C11ROM6: TIN31NGs"• O=2 -W Surface Cement Plug: TBG: Surface to 1300' MD OOA: Surface to 1300' MD 2022 133/8' X 6-518" XO, ti = e.ear First Cement Plug: TBG: 1800' MD to 8400' MD IA: Surface to 8400' MD OA: Surface to 8400' MD BEHIND CT LNR ASSY, F" AlLOUT WtJ0O'JV (F-0414 %47'- 9666' DATE REV BY COhM3�ET5 DATE REV BY CDAih1eVTS 08128/78 ORGANAL COMPLETWN 07+2&18 7ViAu GLV W (07MMS) Maw MIES Am 10d01M6 MAD SET POLAR 010KE(OR72W18) 03107!03 C CT10MMI4ACK(FOIA) 01.107/19 JLAD .,SET PX R-� 8 GLV 00 (17130118) 0SM400 NNM FORD 06N)5/10 .FK',AO GLV C1O (08126119) 08'R7/10 C CTO &IOETft4CK(f-W�. = IMI MI) FAWP tlfj tXaF CTk7H5 FFdJDHOE BAY tiff VVML; F -04B FERMT NO: 21006'70 AR NO: 50-029-200MM T1 IN. R13E 2300' FSL. d 2398' BP ftlwatlan (Alaska) Barrels of Oil per Month or Barrels of Water per Month � N 0 0 O p O O C O O O O O C p O G O N � N O O c-1 o olaem I10 -seg Jo y;uolM jad („j�lM„) seO;o;aad :)lqn:) puesnoyl O O H J N o E Q. y C V * to oc v a o i 2- o a _ 1 y - i 0 a e u i - e % o- o :e ja a a � ♦ o 0 c •` a e _ a a ♦'♦ o c -16 it O O c-1 o olaem I10 -seg Jo y;uolM jad („j�lM„) seO;o;aad :)lqn:) puesnoyl O O H J Image Project Well History File Cover Page XHVZE This page identifies those items that were not scanned during the initial production scanning phase. They are available in the original file, may be scanned during a special rescan activity or are viewable by direct inspection of the file. 4?. I-0 - OF7 Well History File Identifier Organizing(done) ❑ Two-sided 1 I III I III ❑ Rescan Needed II 111111 Rill RE CAN DIGITAL DATA OVERSIZED (Scannable) C for Items: ❑ Diskettes, No. j� ❑ Maps: Greyscale Items: Other, No/Type: CY NO`1 ❑ Other Items Scannable by a Large Scanner ❑ Poor Quality Originals: OVERSIZED (Non-Scannable) ❑ Other: ❑ Logs of various kinds: NOTES: ❑ Other:: BY: Maria) Date: a J3J/ 4 /s/ MP Project Proofing 111111111111111 BY: Maria Date: a 3 / /s/ • Scanning Preparation o2 x 30 = LaO + I 1 = TOTAL PAGES Count does not include covers eh et BY: Maria Date: a 3 `Li. /s/ 61/ Production Scanning 111111111 I Stage 1 Page Count from Scanned File: % 02 (Count does include cover sheet) Page Count Matches Number in Scanning Preparation: V"YES NO BY: Date: al 3 I / /s/ VII P Stage 1 If NO in stage 1, page(s) discrepancies were found: YES NO BY: Maria Date: Is/ Scanning is complete at this point unless rescanning is required. I 11111111111111 ReScanned I I BY: Maria Date: /s/ Comments about this file: Quality Checked 11 1111111 I I I O/00 ton i I \A/..11 Lf..1....,t 1..l,.......D.......1.... o c_ N O co as Q d c as F_ 0 o a a o o z z d O O c c) 0 w a) 0 Z o Q }I aa))I O aai L,-- O O = Z a) o U c a) g > U > > 0 .c ° n z Z UI V ° J 2U J J 2 °a c o •o Q c r a) 0 0 0 0 0 0 0 0 0 0 0 0 J U y •U N N N N N N N U Q co N N M M M M M ce O Z J ,- ,...- N N N II E C -- a) = = N E m a a a a a Cl) Cl). o O V l , co ( Y U U O O O O O O O Ce CC c 2 ca O ZO U v N (0 (0 co CO co CO CO CO (0 o a Z Z a � N ' � III d 0 z Nr Cr) r. 0 d Cl) CO CO 00) 00) CMO CO 0) 00) el -0' W W J a) > a) C.) m o y Z C m ct a S 3 0 z o Qas W z O C `) 0 cn o J a m as = m �,°� o zl � 2 m U U U us u� N y o O Q) a E m a om u)N LO I) I!) I U U E J CO� �' U J m O Q v cc I 9 — 0. i—_ ~ o z _ V) C z N 0 Z G Q N• + + CO CL m a0 O C D WO a) W Cl) o a) 2 N Q d° W tY a) a Z Q C o '' ' CI aa)d orn 2 C E J ) > o Cl) I d ° ° C ' o o - N E E E E C a ' N N m % m m 0 Z a a)°) �z z o o = U U 0 0 v z co E ° o ° Q O J yQ co 2 N c czl, N 0 < Z = O W 0 z y N ce O O m O Q c E E E E ? a •` ? v O ! LL y y y a) J O V C Ea,� J Q J co z Q a W U. a i3 d z a O a) o J a U ‘ ` ` o.+ Z U n E E Q y c T c a) o y ° W n o m o N t a) a Q 0 F- 3 J I- 0 W J d' W d W J J J 3 Q > U Q 2 U o 0 CI N O al — co o Z (II a) U_ N 5 0 c CS z Y. Q -J 1 0 O z = ci ta m al c n c C/ Q c a� O z a. U IX O J a W w V m o z Qc. m J o. Om 0 CO N o O a) 0 N a a) E O N 0 t0 e 00 er 9 LL 2 o Z o QN M N CO m CO n o j Cl) CI m D Q o_ a o a) it Q Z o I U 1/I co z m 0) 0 rn 0j CO 0 3 N d d Ce 10 a E £ m 0 o Page 1 •K Regg, James B (DOA) I" I r) ZI0D1?a From: AK, D&C Well Integrity Coordinator[AKDCWelllntegrityCoordinator @bp.comi 4 2/14/14 Sent: Monday, February 14, 2011 9:29 AM To: Maunder, Thomas E (DOA); Regg, James B (DOA); Schwartz, Guy L (DOA); AK, OPS GC1 OSM; AK, OPS GC1 Field O&M TL; AK, OPS GC1 Wellpad Lead; AK, OPS Well Pad DFT N2; Cismoski, Doug A; Engel, Harry R; AK, D&C Wireline Operations Team Lead; AK, D&C Well Services Operations Team Lead; AK, RES GPB West Wells Opt Engr; AK, RES GPB East Wells Opt Engr; Stone, Christopher; Daniel, Ryan Cc: AK, D&C Well Integrity Coordinator; King, Whitney Subject: OPERABLE: Producer F-04B (PTD#2100870) Tubing Integrity Restored All, Artificially lifted producer F-04B (PTD#2100870) passed a MITIA to 3000 psi on 2/13/2011 after installing dummy gas lift valves in the well. The passing MITIA confirms the presence of two competent barriers in the wellbore. The well has been reclassified as Operable. The well may be returned to production after live gas lift valves are installed. Please be aware of the potential for annular fluid expansion when returning the well to production. Please call if you have any questions. Thank you, Gerald Murphy (alt. Torin Roschinger) Well Integrity Coordinator Office (907) 659-5102 Cell (907) 752-0755 Pager(907)659-5100 Ext. 1154 From: AK, D&C Well Integrity Coordinator Sent: Saturday, January 22, 2011 11:19 PM To: 'Maunder,Thomas E (DOA)'; 'Regg, James B (DOA)'; 'Schwartz, Guy L (DOA)'; AK, OPS GC1 'SM; AK, OPS GC1 Field O&M TL; AK, OPS GC1 Wellpad Lead; AK, OPS Well Pad DFT N2; Cismos. Doug A; Engel, Harry R; AK, D&C Wireline Operations Team Lead; AK, D&C Well Services Oper. 'ins Team Lead; AK, RES GPB West Wells Opt Engr; AK, RES GPB East Wells Opt Engr; Stone, Chri •pher Cc: AK, D&C Well Integrity Coordinator; Walker, Greg (D&C); King, Whitney Subject: UNDER EVALUATION: Producer F-04B (PTD #2100870) Sustai =. Casing Pressure on the IA - POP to perform TxIA diagnostics All, Artificially lifted producer F-04B (PTD#2100870)was • assified as Not Operable during the shut down due to sustained casing pressure. The wellhead pr- sures were tubing/IA/OA equal to 200/2100/0 psi on 01/14/2011. The well has been reclassified as der Evaluation so that it may be placed on production to perform diagnostics. The OA fluid level is near surface; , ease be careful of thermal expansion when placing F-04B on production. Plan forward: 1. DHD: TIFL 2. Well Integrity Engi •er: Write work request to mitigate TxIA communication pending TIFL results A TIO plot and ,ellbore schematic have been included for reference. Please c. if you have questions or concerns. 2/14/2011 Page lo.f2' Regg, James B (DOA) _— t 2_(0_0S7 —---_—_ From: AK, D&C Well Integrity Coordinator[AKDCWellIntegrityCoordinator @bp.com] Sent: Saturday, January 22, 2011 11:19 PM To: Maunder, Thomas E (DOA); Regg, James B(DOA); Schwartz, Guy L (DOA); AK, OPS GC1 OSM; AK, OPS GC1 Field O&M TL; AK, OPS GC1 Wellpad Lead; AK, OPS Well Pad DFT N2; Cismoski, Doug A; Engel, Harry R; AK, D&C Wireline Operations Team Lead; AK, D&C Well Services Operations Team Lead;AK, RES GPB West Wells Opt Engr; AK, RES GPB East Wells Opt Engr; Stone, Christopher Cc: AK, D&C Well Integrity Coordinator; Walker, Greg (D&C); King, Whitney Subject: UNDER EVALUATION: Producer F-04B(PTD#2100870) Sustained Casing Pressure on the IA- POP to perform TxIA diagnostics Attachments: Producer F-04B (PTD#2100870)TIO Plot.doc; Producer F-04B (PTD#2100870)wellbore schematic.pdf All, Artificially lifted producer F-04B (PTD#2100870)was classified as Not Operable during the shut down due to sustained casing pressure. The wellhead pressures were tubing/IA/OA equal to 200/2100/0 psi on 01/14/2011.'Tfie well has been reclassified as Under Evaluation so that it may be placed on production to perform diagnostics. The OA fluid level is near surface; please be careful of thermal expansion when placing W-01A on production. Plan forward: 1. DHD: TIFL 2. Well Integrity Engineer: Write work request to mitigate TxIA communication pending TIFL results A TIO plot and wellbore schematic have been included for reference. Please call if you have questions or concerns. Thank you, Gerald Murphy (alt. Torin Roschinger) Well Integrity Coordinator Office (907)659-5102 Cell (907) 752-0755 Pager(907)659-5100 Ext. 1154 From: AK, D&C Well Integrity Coordinator Sent: Friday,January 14, 2011 10:34 PM To: 'Regg, James B(DOA)'; 'Maunder,Thomas E(DOA)'; 'Schwartz, Guy IP•A)'; Cismoski, Doug A; Engel, Harry R; AK, D&C Well Services Operations Team Lead; AK, D& ireline Operations Team Lead; AK, OPS FS2 DS Ops Lead; AK, OPS FS2 Ops Lead; AK, OPS FS2 0 ; AK, OPS FS2 OSS; AK, RES GPB East Wells Opt Engr; AK, OPS GC3 Welipad Lead; AK, OPS GC3 •cility&Field OTL; AK, OPS GC1 OSM; AK, OPS Prod Controllers; AK, OPS GC2 OSM; AK, OPS GC2 ►is Lead; AK, OPS GC2 Welipad Lead; AK, OPS GC2 Field O&M IL; AK, OPS GC2 OSS; AK, OPS We •ad DFT N2; AK, OPS GC1 Wellpad Lead; AK, OPS GC1 OSM; AK, OPS GC1 Field 0&M TL; AK, RES -•B West Wells Opt Engr Cc: AK, D&C Well Integrity Coordinator; King, W ' ey; Bommarito, Olivia 0; Robertson, Daniel B (Alaska); Ramsay, Gavin; Stone, Christopher; .. chner, Carolyn J; Longden, Kaity; Phillips, Patti J; Sayed, Mohamed; Holt, Ryan P (ASRC) Subject: Producers with sustained Iasi•• pressure on IA and OA due to proration All, The following producers w--- found to have sustained casing pressure on the IA during the proration January 12-14. The i -diate action is to perform a TIFL on each of the wells and evaluate for IA 1/25/2011 a 0 g�0000 411 III 4111 t 411' I 1::::::1----m---- r 0 co co wr r O cc d 3 0 CD CD • {'J O CO CL M co O ct r r r N d N m 0' TREE"' CIW WarHEA 0= McEVOY SAFE1 TES: WELL ANGLE>70*@ 10487' ACTUATOR= BAKER C F-04 B -4-1/2"CHROME TUBING KB.ELEV= 57.1', BF.ELEV= 39.17' KOP= 3000' 1,) X X Max Angle= 96°@ 10817 30"CONDUCTOR H 95' Dattirrn MD= 10193' 1934' -1946'1-113-3/8"BAASCH ROSS CSG PATCH I —Datum ND= 8800'SS f 2000' j—{9-5/8"X 7"XO,ID 13-3/8"CSG,72#,N-80 BTRS,ID=12.347" H 1934' ..-- =6.276" I 2022' H 1 3-3/8"X 9-5/8"XO,ID=8.681" 1 CSG,47#,NT-80S, NSCC, ID=8.681" -j 2000' --I 18-5/8"CSG,96.5#,K55 BTRS,ID-=17.655"H 2004' '13-3/8'CSG,68#,K-55,ID=12.415" -1 2022' 2088' H4-1/2"HES X NIP,ID=3.813" I 4-1/2"TBG,12.6#,13CR-80 VAM ACE XO —I 2068' GAS LIFT MA NDRELS 13CR-80 VAM TOP ST MD ND DEV TYPE VLV LATCH PORT DATE Minimum ID = 1.780" @ 8573' I 3 3410 3387 23 KBG-2 DOME BK 16 08/28/10 2 6631 5919 39 KBG-2 SO BK 20 08/28/10 1 8418 7338 35 KBG-2 DMY SBK-2C 0 09/12/08 8487' H4-1/2"HES X NIP,ID=3.813" I 2,70" BTT DEPLOYMENT SLEEVE ....1 8508' I-17"X 4-1/2"BKR S-3 PKR,ID=3.870' I 8531' —14-1/2"HES X NIP,ID=3.813" 1 C. or■ I 8534' I-14-1/2"BKR KB LW,ID=2.370 I TOP OF 3-1/2"LNR I 8550" PI/ [7351T1-12-7/8"X 2-3/8"XO,ID=1.920 I TOP OF 2-3/8"LNR -I 8557' I 1.780" I 4-1/2"TBG, 12.6#,13CR-80 VAM TOP, H 8605' I 1 8550' JH-123:7700::BTT DEPLOY LIDv=i3D.00. -14-1/2"HES XN NIP,ID=3.725" I 8607' ...1-14-1/2"WLEG,ID=3.958" I I I .0152 bpf, ID=3.958 . f 8642' 1-17"PER(40'),ID=? 1 .... BEll ND 7"TBG,26#,L-80 1,14S,.0383 bpi, ID=6.276" —1 8656, a i' [-----ii -i-19-5/8"X 7"LIP,ID=?? I CT LNR I 8664' I-19-5/8"X 7"SEAL ASSY,ID=?? I I 8682' H T'BOT LNR TOP PKR,ID=? I 9-5/8"CSG,47#,N-80 S/L,ID=8.681'' I-1 9312' I ■, 8775' 1-19-9/8"x 7"TIW I TPw/I NR HGR,ID=? I I 9600' I-13-1/2"X 3-3/16"XO ID=2.786" I • 4-1/2"X 7"BKR VVH1PSTOCK(07/15/10) 9642' 7"LNR,29#,N-80 S/L,.0371 bpf,ID=6.184" 11 9655' .■ i % •,,.■ • • 7"MILLOUT WINDOW (F-0413) 9647'-9655' 10726' -12-3/8"MARKER JOINT 1 611116 \1 .4 i ESTIMATED TOC SCMT(08/18/06) —1 9762' • :IT.. PERFORATION SUMMARY •4. 4 REF LOG: SWS MEM CNL/GR ON 08/20/10 •- •••4 ■•• 4•• ANGLE A T TOP PERE: 94"ig 10680' ....:0 ..•J Note:Refer to Production DB for historical pert data 4 11672' PBTD SIZE SPF INTERVAL Opn/Sqz DATE 3-3/16"LNR,6.2#,L-80 TCII, —I 9760' I 1 56" 6 10680-11010 0 08/20/10 .0076 bpf,ID"'2.80" 1.56" 6 11060-11200 0 08/20/10 . 1.56" 6 11460-11660 0 08/20/10 ix- 2-3/8"LNR,4.70#,L-80 STL,.0039 bpf,ID=1.992" H 1 1 67 9' !rill; , DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT 06/26/76 ORIGINAL COMPLETION 08/30/10 JLJ/A GR GLV C/O(08/28/10) WELL: F-048 07/10/87 NiES RWO 08/31/10 PJC DRLG DRAFT CORRECTIONS PERMIT No: 2100870 03/03/03 NORDIC 2 CTD SIDETRACK(F-04A) 11/18/10 - PJC 3-1/2"X 3-3/16"LNR ADDED ' API No: 50-029-20089-02 09/14/08 N4ES RWO 11/24/10 SNWVI/PJC FINAL DRLG CORRECTIONS SEC 2,T11R R13E,2308'FSL&2396'FV'VL . 08/22/10 NORDIC 1 CTD SIDETRACK(F-04B) 08/24/10 PJC DRLG DRAFT CORRECTIONS BP Exploration(Alaska) ---------- - -------- Page 1 of 1 Regg, James B (DOA) From: AK, D&C Well Integrity Coordinator[AKDCWelIIntegrityCoordinator @bp.com] Sent: Friday, January 14, 2011 10:34 PM '���� /(7.4-)I k To: Regg, James B (DOA); Maunder, Thomas E (DOA); Schwartz, Guy L (DOA); Cismoski, Doug A; Engel, Harry R; AK, D&C Well Services Operations Team Lead; AK, D&C Wireline Operations Team Lead; AK, OPS FS2 DS Ops Lead; AK, OPS FS2 Ops Lead; AK, OPS FS2 OSM; AK, OPS FS2 OSS; AK, RES GPB East Wells Opt Engr; AK, OPS GC3 Wellpad Lead; AK, OPS GC3 Facility & Field OTL; AK, OPS GC1 OSM; AK, OPS Prod Controllers; AK, OPS GC2 OSM; AK, OPS GC2 Ops Lead; AK, OPS GC2 Wellpad Lead; AK, OPS GC2 Field O&M TL; AK, OPS GC2 OSS; AK, OPS Well Pad DFT N2; AK, OPS GC1 Wellpad Lead; AK, OPS GC1 OSM; AK, OPS GC1 Field O&M TL; AK, RES GPB West Wells Opt Engr Cc: AK, D&C Well Integrity Coordinator; King, Whitney; Bommarito, Olivia 0; Robertson, Daniel B (Alaska); Ramsay, Gavin; Stone, Christopher; Kirchner, Carolyn J; Longden, Kaity; Phillips, Patti J; Sayed, Mohamed; Holt, Ryan P (ASRC) Subject: Producers with sustained casing pressure on IA and OA due to proration All, The following producers were found to have sustained casing pressure on the IA during the proration January 12-14. The immediate action is to perform a TIFL on each of the wells and evaluate for IA repressurization. If any of the wells fail the TIFL, a follow up email will be sent to the AOGCC for each individual well. 11-05A (PTD#1961570) C-15A (PTD#2090520) E-17A (PTD#2042040) E-27A (PTD#1990590) ✓P-04B (PTD#2100870) W-01A (PTD#2031760) W-16A (PTD#2031000) W-21A (PTD#2011110) W-25A (PTD#2091020) W-38A (PTD#2021910) The following producers were found to have sustained casing pressure on the OA during the proration January 12-14. The immediate action is to perform an OA repressurization test and evaluate if the IAxOA pressure is manageable by bleeds. If the IAxOA communication is unmanageable, a follow up email will be sent to the AOGCC notifying you of the remedial plan. 09-34A (PTD#1932010) M-21A (PTD#1930750) N-22B (PTD#2061610) All the wells listed above will be classified as Not Operable until start-up operations commence and are stable or the well passes a pressure test proving integrity. After start-up, the wells will then be reclassified as Under Evaluation with POP parameters to prevent any over-pressure incidents. Please call with any questions or concerns. Thank you, Torin Roschinger (alt. Jerry Murphy) Well Integrity Coordinator Office (907) 659-5102 Harmony Radio x2376 Cell (406) 570-9630 Pager(907)659-5100 Ext. 1154 1/24/2011 � 1 I Ira 1 BAKER M11JaMES Baker Atlas PRINT DISTRIBUTION LIST COMPANY BP EXPLORATION(ALASKA)INC COUNTY NORTH SLOPE BOROUGH WELL NAME F-04B STATE ALASKA FIELD PRUDHOE BAY UNIT DATE 12/10/2010 THIS DISTRIBUTION LIST AUTHORIZED BY: DEBBIE HOKE SO#:3317848 Copies of Copies Digital Copies of Copies Digital Each Log of Film Data Each Log of Film Data 2 Company BP EXPLORATION(ALASKA)INC 1 Company DNR-DIVISION OF OIL&GAS Person PETROTECHNICAL DATA CENTER Person CORAZON MANAOIS Address LR2-1 Address 550 WEST 7TH AVE 900 E BENSON BLVD. SUITE 800 ANCHORAGE,AK 99508 ANCHORAGE,AK 99501 1 Company EXXON MOBIL PRODUCTION CO Company Person FILE ROOM Person Address 800 BELL STREET Address EMB GSC 3082A HOUSTON,TX 77002 1 Company STATE OF ALASKA-AOGCC Company Person CHRISTINE MAHNKEN Person Address 333 W.7TH AVE Address SUITE 100 ANCHORAGE,AK 99501 Company Company Person Person Address Address Company Company Person Person Address Address Data Disseminated By BAKER ATLAS-PDC 17015 Aldine Westfield,Houston,Texas 77073 This Distribution List Completed By: 010-102 Page 1 of 1 Correction: Liner Addition 11/03/10 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1 a. Well Status: ® Oil ❑Gas ❑SPLUG ❑Other ❑Abandoned ❑Suspended 1 b. Well Class: 2OAAC 25.105 20AAC 25.110 Development ❑Exploratory ❑ GINJ ❑WINJ ❑WAG ❑WDSPL ❑Other No.of Completions ❑Service ❑Stratigraphic 2. Operator Name: 5.Date Comp.,Susp.,or Aband.: 12. Permit to Drill Number: BP Exploration(Alaska) Inc. 8/22/2010 210-087 3. Address: 6.Date Spudded: 13. API Number: P.O. Box 196612,Anchorage,Alaska 99519-6612 8/9/2010 50-029-20089-02-00 4a. Location of Well(Governmental Section): 7.Date T.D.Reached: 14. Well Name and Number: Surface: 8/18/2010 PBU F-04B 2308'FSL,2396'FWL, SEC.02,T11N, R13E, UM 8. KB(ft above MSL): 57.10' 15.Field/Pool(s): Top of Productive Horizon: 2890'FSL, 780'FWL, SEC.01,T11N, R13E, UM GL(ft above MSL): 33.28' Prudhoe Bay Field/Prudhoe Bay Total Depth: 9.Plug Back Depth(MD+TVD): Oil Pool 2546'FSL,5049'FWL, SEC.02,T11N, R13E, UM 11672' 9045' 4b. Location of Well(State Base Plane Coordinates,NAD 27): 10.Total Depth(MD+TVD): 16. Property Designation: Surface: x- 651960 y- 5973828 Zone- ASP4 11681' 9019' ADL 028280 TPI: x- 655611 y- 5974486 Zone- ASP4 11.SSSV Depth(MD+TVD): 17. Land Use Permit: Total Depth:x- 654608 y- 5974120 Zone- ASP4 N/A 18.Directional Survey: ❑Yes No 19.Water depth,if offshore: 20. Thickness of Permafrost(ND): (Submit electronic and printed information per 20 AAC 25.050) N/A ft MSL 1900'(Approx.) 21.Logs Obtained (List all logs here and submit electronic and printed information per 20 AAC 25.071): 22. Re-Drill/Lateral Top Window MD/ND: GR/ROP/Res/Memory CNL/GR/CCL/MWD 9649' 8350' 23. CASING,LINER AND CEMENTING RECORD SETTING DEPTH MD SETTING DEPTH TVD HOLE AMOUNT CASING WT.PER FT. GRADE To ' BOTTOM To BOTTOM SIZE CEMENTING RECORD PULLED 30" Stove Pipe Surface 96' Surface 96' 36" 18-5/8" 96.5# K-55 _Surface, 2004' Surface 2004' 24" 9200 sx Permafrost 13-3/8"x 9-5/8" 68#/47# K-55/N-80 Surface, 9312' Surface 8075' 12-1/4" 2410 sx Class'G'. 1775 sx PF I I 9-5/8"x 7" 47#/29# N-80 Surface, 9649' Surface 8350' 12-1/4"x 8-1/2" 460 sx Class'0' 3-1/2"x 3-3/16" 9.3#/6.2# L-80 8551' 9760' 7448' 8448 4-1/8" Uncemented.solid liner DL. 2-3/8" 4.6# L-80 8534' 11679' 7433' _ 9045' 3" 39 sx Class'G' 24. Open to production or injection? IS Yes ❑No 25. TUBING RECORD If Yes,list each interval open SIZE DEPTH SET(MD) PACKER SET(MD/ND) (MD+ND of Top&Bottom;Perforation Size and Number): 1.56"Gun Diameter,6 SPF 4-1/2", 12.6#, 13Cr80 8607'/7494' 8508'/7412' MD ND MD TVD 10680'-11010' 9049'-9048' 26. N ACID,FRACTURE,CEMENT SQUEEZE,ETC. 11060'-11200' 9048'-9045' 11460'-11660' 9046'-9045' DEPTH INTERVAL(MD)I AMOUNT AND KIND OF MATERIAL USED 2500' Freeze Protected with Diesel 27. _ PRODUCTION TEST Date First Production: Method of Operation(Flowing,Gas Lift,etc.): September 4,2010 Flowing Date of Test: Hours Tested: Production For OIL-BBL: GAS-MCF: WATER-BBL: CHOKE SIZE: GAS-OIL RATIO: 9/3/2010 6 ,Test Period 4 265 485 3 60 1833 Flow Tubing Casing Press: Calculated OIL-BBL: GAS-MCF: WATER-BBL: OIL GRAVITY-API(CORR): Press. 220 1300 24-Hour Rate ♦ 1059 1941 13 28. CORE DATA Conventional Core(s)Acquired? ❑ Yes 0 No Sidewall Core(s)Acquired? ❑Yes 0 No If Yes to either question,list formations and intervals cored(MD+TVD of top and bottom of each),and summarize litholog , n r e f •- or water (submit separate sheets with this form,if needed). Submit detailed descriptions,core chips,photographs and laboratory `r "V 250.071. None Nov 0 4 2010 RBDMS NOV 0 5 -2010 Alaska Oil&Gas Cans.Coattaion Form 10-407 Revised 12/2009 CONTINUED ON REVERSE A r U As%� yt��, igal Only ! . (./ vU 29. GEOLOGIC MARKERS(List all formations and m .s encountered): 30. DRMATION TESTS NAME MD TVD Well Tested? ❑Yes ®No Permafrost Top If yes,list intervals and formations tested,briefly summarizing test Permafrost Base results. Attach separate sheets to this form,if needed,and submit detailed test information per 20 AAC 25.071. Top Sag River 9758' 8446' Shublik A 9802' 8488' None Top Sadlerochit/Zone 4B 9883' 8567' TCGL/Zone 3 10006' 8688' BCGL/Zone 2C 10087' 8764' 25N/23SB/Zone 2B 10151' 8821' 22N/22TS 10223' 8881' 21N/Zone 2A 10286' 8929' Zone 1B 10401' 9002' TDF/Zone 1A 10474' 9034' MHO 10525' 9049' HOT 10560' 9054' Initial Invert Point 10603' 9055' Top Zone 1A/Base Zone 1B 11056' 9049' Formation at Total Depth(Name): Base of Zone 1B 11681' 9049' 31.List of Attachments: Well Schematic Diagram 32. I hereby certify that the forego Ong is true and correct to the best of my knowledge. Signed: Sondra tewman c( ? Title: Drilling Technologist Date: 11- D3 I PBU F-04B 210-087 Prepared By Name/Number Sondra Stewman, 564-4750 Well Number Permit No./Approval No. Drilling Engineer: Sean McLaughlin, 564-4387 INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. Item 1 a: Classification of Service Wells: Gas Injection,Water Injection,Water-Alternating-Gas Injection,Salt Water Disposal,Water Supply for Injection, Observation,or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. Item 4b: TPI(Top of Producing Interval). Item 8: The Kelly Bushing and Ground Level elevation in feet above mean sea level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. Item 13: The API number reported to AOGCC must be 14 digits(ex: 50-029-20123-00-00). Item 20: Report true vertical thickness of permafrost in Box 20. Provide MD and TVD for the top and base of permafrost in Box 28. Item 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. Item 24: If this well is completed for separate production from more than one interval(multiple completion),so state in item 1,and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Item 27: Method of Operation: Flowing,Gas Lift,Rod Pump,Hydraulic Pump,Submersible,Water Injection,Gas Injection,Shut-In,or Other(explain). Item 28: Provide a listing of intervals cored and the corresponding formations,and a brief description in this box. Submit detailed description and analytical laboratory information required by 20 AAC 25.071. Item 30: Provide a listing of intervals tested and the corresponding formation,and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Form 10-407 Revised 12/2009 Submit Original Only 'TRE_ * CM/ WELLHEAD= McEVOY F-04B SAFA OOACOMM y41/2"CHROMETUBINGm O ACTUATOR= BAKER C KB.ELEV= 57.1' CTD Sidetrack BF. ELEV= 39.17' KOP= 3000' ) I Max Angle= 96°@ 10812' 30"CONDUCTOR H 95' I Datum MD= 10246' 1 I I 1 I-113-3/8" BAASCH ROSS CSG PATCH Datum WD= 8800'SS 13-3/8"CSG,72#,N-80 BTRS,ID=12.347" H 1934' ■ 2000' I-19-5/8"X 7"XO,ID=6.276" I 9-5/8"CSG,47#,NSCC, tJ=8.681" IH 2000' I 2022' 1-113-3/8"X 9-5/8"XO, ID=8.681" I 18-5/8"CSG,96.5#,K55 BTRS,ID=17.655" -I 2004' 13-3/8"CSG,68#,K-55,ID=12.415" I-J 2022' 2088' I--I4-1/2"HES X NIP,ID=3.813" I 4-1/2"TBG, 12.6#,13CR-80 VAM ACE XO H 2068' GAS LIFT MANDRELS 13CR-80 VAM TOP ST MD TVD DEV TYPE VLV LATCH PORT DATE MI 3 3410 3387 23 KGB-2 DOME BEK 16 09/24/08 2 6631 5919 39 KGB-2 SO SBK-2C 20 09/24/08 Minimum ID - 1.78" a� 8573' 1 8418 7338 35 KGB-2 DMY SBK-2C 0 09/12/08 TOP OF 2-3/8" LINER I 8487' H4-1/2"HES X NIP,ID=3.813" I .-a 1 8508' I-17"X 4-1/2" BKR S-3 PKR,ID=ID=3.870" I 4-1/2"BKR KB LTP, ID=1.80" 8533' I 8531' I-I4-1/2"HES X NIP,ID=3.813" I . 3, 6. ... t_3-1 h �-�;#�'Prot-coon sfrr, � X551 I-� TOL 2-318°'- SOT Deployment sleeve H 8573' I .... 8594' �4-1/2"HES XN NIP, ID gilled to =3.80" I 4-1/2"TBG, 12.6#,13CR- O VAM TOP, 8607' I ' 0152 bpf,ID=3.958 8607' H 4-1/2"WLEG,ID=3.958" I 7"TBG,26#,L-80,.0383 bpf,ID=6.276" 8680' 8642' I�7"PBR(40),ID=? p L I M j 1 8682' H7"BOT LNR TOP PKR,ID=? I • 1 8775 I-19-5/8"X 7"TMJ LTP w/LNR HGR,ID=? I 1 1 9-5/8"CSG,47#,N-80 S/L,ID=8.681" 9312' 4-112"x 7'whipstock 1 9642' 1 /'3-1/2"XOto i 3118" -I 620' I TOP OF 2-3/8"LNR/ JET CUT(08/28/08) -I 9700' I A 3-3:1S" LNR,O `. L-80 TC 9, h ".786" -I 9760' I PERFORATION SUMMARY ', 10164` -JEST. TOC 2-3/8"LINER 3"HOLE 4\"'^, . ' REF LOG: SWS MEM CNL/GR ON 08/20110 : . ANGLE AT TOP PERF: 92"@ 10680' Note:Refer to Production DB for historical perf data ,- SIZE SPF INTERVAL Opn/Sqz DATE Yf't NIA 2-3/8" LNR;4.6#,L-80 STL, .0039 bpf,ID= 1.995" H 11679' 1.S?� 6 10680- 11010 0 08/20/10 INS •V• ••• 11.'.4 9762' H ESTIMATED TOP OF CEMENT SUIT(08/18/06) I 1.56 $ 11060- 11200 0 08/20/10 .11 1,1 1.56 6 11460-11660 0 08/20/10 '*'1'� ,44.ISGR 9766' ***** MILLOUT WINDOW (F-04A)10010'- 10016' Mir. I**WW V, 1*�A�A�****A4 Illiftimi AAWAW 7"LNR,29#,N-80 S/L,.0371 bpf,ID=6.184" I 10665' ��, 2-3/8"LNR,4.6#,L-80 STL,.0039 bpf,ID=1.995" 11193' DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT 06/26/76 ORIGINAL COMPLETION 12/15/08 HW/PJC DRLG DRAFT CORRECTIONS WELL: F-045 07/10/87 NIES RWO 08/22/10 Nordic 1 CTD SIDETRACK for mare 011 . PERMIT No: 03/03/03 NORDIC 2 CTD SIDETRACK(F-04A) AR No: 50-029-20089-02 09/14/08 N4ES RWO SEC 2,T11 N, R13E,2308'FSL&2396'FWL 09/24/08 JLJ/TLH GLV C/O 11/18/08 HW/JMD DRLG DRAFT CORRECTIONS BP Exploration(Alaska) I O0 m v r N m o m D z s$ c_m m w a o D m m 3 0 2. E- 012 w9�u 747 s 7C,fin a y E p m W°j "w b o A o. m-f 3 < g DDmmmRD e ; m w m m c O s m m °oo`c n 9 G N 21 m m m 0 < m i mpx,TmN o` < bobbbbb .. c N o°o°o$a°o o.. a Z m V V A�l m N Z O n n S;3 C 2 ' 2 2 N n n n N' X.Z OOirZ•�� O 1 1 m 13 z oo O 9 m 4 ii rci O 00 1 GU I ...... • A J N A N O 4 N A O eO N 0000000 m r Mn 1►v��► 3 O H • • • cl N m m 0 ;la 04 / . D..>aN m 'm f) g xm ,: -0 2 On o 2 o m o , 'ag.= l'I, Za Gs N m = �p J w-m 3 ga, xs�'odm a Y�I 2. fn T w r m 0 e . m m j 00 0 r ■ 0 N cp O STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1 a. Well Status: ® Oil ❑Gas ❑SPLUG ❑Other ❑Abandoned ❑Suspended 1 b. Well Class: 20AAC 25.105 2OAAC 25.110 ® Development ❑Exploratory ❑ GINJ ❑WINJ ❑WAG ❑WDSPL ❑Other No.of Completions ❑Service ❑Stratigraphic 2. Operator Name: 5.Date Comp.,Susp.,or Aband.: 12. Permit to Drill Number: BP Exploration(Alaska)Inc. 8/22/2010 210-087 3. Address: 6.Date Spudded: 13. API Number: P.O. Box 196612,Anchorage,Alaska 99519-6612 8/9/2010 50-029-20089-02-00 4a. Location of Well(Governmental Section): 7.Date T.D.Reached: 14. Well Name and Number: Surface: 8/18/2010 PBU F-04B 2308'FSL,2396'FWL, SEC.02,T11N, R13E, UM 8. KB(ft above MSL): 57.10' 15.Field/Pool(s): Top of Productive Horizon: 2890'FSL, 780'FWL, SEC.01,T11N, R13E, UM GL(ft above MSL): 33.28' Prudhoe Bay Field/Prudhoe Bay Total Depth: 9.Plug Back Depth(MD+TVD): Oil Pool 2546'FSL,5049'FWL, SEC.02,T11N, R13E, UM 11672' 9045' 4b. Location of Well(State Base Plane Coordinates,NAD 27): 10.Total Depth(MD+TVD): 16. Property Designation: Surface: x- 651960 y- 5973828 Zone- ASP4 11681' 9019' ADL 028280 TPI: x- 655611 y- 5974486 Zone- ASP4 11.SSSV Depth(MD+TVD): 17. Land Use Permit: Total Depth:x- 654608 y- 5974120 Zone- ASP4 N/A 18.Directional Survey: Yes ❑No 19.Water depth,if offshore: 20. Thickness of Permafrost(ND): (Submit electronic and printed information per 20 AAC 25.050) N/A ft MSL 1900'(Approx.) 21.Logs Obtained (List all logs here and submit electronic and printed information per 20 AAC 25.071): 22. Re-DrillLateral Top Window MD/TVD: GR/ROP/Res/Memory CNL/GR/CCL/MWD 9649' 8350' 23. CASING,LINER AND CEMENTING RECORD SETTING DEPTH MD SETTING DEPTH ND HOLE AMOUNT CASING WT.PER FT. GRADE ToP BOTTOM ToP BOTTOM SIZE CEMENTING RECORD PULLED 30" Stove Pioe Surface 96' Surface 96' 36" 18-5/8" 96.5# K-55 Surface 2004' Surface 2004' 24" 9200 sx Permafrost 13-3/8"x9`8" 68#/47# K-55/N-80 Surface 9312' Surface 8075' 12-1/4" 2410 sx Class'G'. 1775 sx PF I I 9-5/8"x 7" 47#/29# N-80 Surface 9649' Surface 8350' 12-1/4"x 8-1/2" 460 sx Class'G' 2-3/8" 4.6# L-80 8534' 11679' 7433' 9045' 3" 39 sx Class'G' _ 33/rig' x3t" ZSd7 9?4L" y,LS" au-Ce«.ew.fed f;Kcr 24. Open to production or injection? ®Yes ❑No 25. TUBING RECORD If Yes,list each interval open (MD+ND of Top&Bottom;Perforation Size and Number): SIZE DEPTH SET(MD) PACKER SET(MD/TVD) 1.56"Gun Diameter,6 SPF 4-1/2", 12.6#, 13Cr80 8607'/7494' 8508'/7412' MD ND MD TVD 10680'-11010' 9049'-9048' 26. ACID,FRACTURE,CEMENT SQUEEZE,ETC. 11060'-11200' 9048'-9045' :.». w 11460'-11660' 9046'-9045' ` COMP4.El0ti DEPTH INTERVAL(MD) AMOUNT AND KIND OF MATERIAL USED ...All • 1 2500' Freeze Protected with Diesel i...4W. t , 27. PRODUCTION TEST Date First Production: Method of Operation(Flowing,Gas Lift,etc.): September 4,2010 Flowing Date of Test: Hours Tested: Production For OIL-BBL: GAS-MCF: WATER-BBL: CHOKE SIZE: GAS-OIL RATIO: 9/3/2010 6 Test Period ♦ 265 485 3 60 1833 Flow Tubing Casing Press: Calculated OIL-BBL: GAS-MCF: WATER-BBL: OIL GRAVITY-API(CORR): Press. 220 1300 24-Hour Rate ♦ 1059 1941 13 28. CORE DATA Conventional Core(s)Acquired? ❑ Yes ®No Sidewall Core(s)Acquired? ❑Yes ®No If Yes to either question,list formations and intervals cored(MD+TVD of top and bottom of each),and summarize lithology and presell r: r �?app dal' (submit separate sheets with this form,if needed). Submit detailed descriptions,core chips,photographs and laboratory analytical-rbauftd'• • i 0.071. None `) 2010 i MEWS OCT 0 5 . ;� ! as LOS« Form 10-407 Revised 12/2009 CONTINUED ON REVERSE Submit Original Only /(- 3-/0 ` t011 G 29. GEOLOGIC MARKERS(List all formations and m rs encountered): 30. ORMATION TESTS NAME MD ND Well Tested? ❑Yes ®No Permafrost Top If yes,list intervals and formations tested,briefly summarizing test Permafrost Base results. Attach separate sheets to this form,if needed,and submit detailed test information per 20 AAC 25.071. Top Sag River 9758' 8446' Shublik A 9802' 8488' None Top Sadlerochit/Zone 4B 9883' 8567' TCGL/Zone 3 10006' 8688' BCGL/Zone 2C 10087' 8764' 25N/23SB/Zone 2B 10151' 8821' 22N/22TS 10223' 8881' 21N/Zone 2A 10286' 8929' Zone 1B 10401' 9002' TDF/Zone 1A 10474' 9034' MHO 10525' 9049' HOT 10560' 9054' Initial Invert Point 10603' 9055' Top Zone 1A/Base Zone 1B 11056' 9049' Formation at Total Depth(Name): Base of Zone 1B 11681' 9049' 31.List of Attachments: Summary of Daily Drilling Reports and Post Rig Well Work,Well Schematic Diagram,Surveys. 32.I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed: Sondra S wman Title: Drilling Technologist Date: I(1)— t PBU F-04B 210-087 Prepared By Name/Number Sondra Stewman, 564-4750 Well Number Permit No./Approval No. Drilling Engineer: Sean McLaughlin,564-4387 INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. Item 1 a: Classification of Service Wells: Gas Injection,Water Injection,Water-Alternating-Gas Injection,Salt Water Disposal,Water Supply for Injection, Observation,or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. Item 4b: TPI(Top of Producing Interval). Item 8: The Kelly Bushing and Ground Level elevation in feet above mean sea level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. Item 13: The API number reported to AOGCC must be 14 digits(ex: 50-029-20123-00-00). Item 20: Report true vertical thickness of permafrost in Box 20. Provide MD and ND for the top and base of permafrost in Box 28. Item 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. Item 24: If this well is completed for separate production from more than one interval(multiple completion),so state in item 1,and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Item 27: Method of Operation: Flowing,Gas Lift,Rod Pump,Hydraulic Pump,Submersible,Water Injection,Gas Injection,Shut-In,or Other(explain). Item 28: Provide a listing of intervals cored and the corresponding formations,and a brief description in this box. Submit detailed description and analytical laboratory information required by 20 AAC 25.071. Item 30: Provide a listing of intervals tested and the corresponding formation,and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Form 10-407 Revised 12/2009 Submit Original Only North America -ALASKA- BP Page 1 of 2 : F-04 : MOBILIZATION (MOB) : 8/6/2010 : 8/20/2010 X3-00VW8-C(701,875.00) : Prudhoe Bay : PB F Pad • :NORDIC 1 :2/1/1971 12:00:00AM :NORDIC CALISTA :500292008900 :4:04 2/2/1971 00:00 @57.10ft(above Mean Sea Level) 8/6/2010 08:00 - 09:00 MOB P PRE MOVE RIG FROM BACKSIDE OF F PAD TO FRONT SIDE OF F PAD.SIMULTANEOUSLY, PREP GRAVEL IN FRONT OF WELL. 09:00 - 09:35 MOB P PRE WHILE GETTING PERMIT SIGNED,8 STUDS NOT MEETING API SPEC ON 13-5/8"x18-5/8" CASING FLANGE(OOAxOA)WERE NOTICED. WELL HOUSE FLOOR GRATING WAS OBSTRUCTING THE WELLHEAD INSPECTION PRE RIG. SET RIG DOWN.GREASE CHOKE MANIFOLD &REEL HOUSE HARDLINE VALVES,GREASE CHOKE&KILL HCR.C/O GRIPPER BLOCKS ON INJECTOR.REPLACE PACKING IN MUD PUMP#1.SPOT OFFICE TRAILER.CLEAN UP AROUND F-47.BRING SUPPORT EQUIPMENT FROM F-47 TO F-04, 09:35 - 09:45 MOB C PRE PJSM REGARDING WELLHEAD WORK WITH CAMERON WELL HEAD TECHS(4), DHD TECH (1). 09:45 - 11:00 MOB C PRE SPOT BLEED TRAILER NEXT TO WELLHEAD. PLACE CELLAR BOARDS FOR CASING FLANGE ACCESS.BLEED OFF OA&OOA FROM 0++PSI. LEAVE OPEN BLEED ON OA& OOA,MONITOR SAME DURING JOB BY DHD TECH.WIRE BRUSH&PLACE KROIL OIL ON ALL CASING STUDS.WAIT FOR PROPER WRENCH. 11:00 - 13:10 MOB C PRE ONE AT A TIME,REPLACE 8 STUDS&ADJUST THE REST TO MEET API SPEC. 13:10 - 14:30 MOB P PRE SET DOWN T-MATS AROUND TREE.SPOT RIG OVER WELL.PULL TREE CAP.ACCEPT RIG AT 14:30. 14:30 - 16:30 MOB P PRE NU BOPE.RU IA&OA TRANSDUCERS& CRASH FRAMES.SPOT CUTTINGS BOX. RESPOT OFFICE TRAILER. 16:30 - 16:50 MOB P PRE PJSM REGARDING SWAPPING OUT REELS. 16:50 - 18:00 MOB P PRE SWAP OUT 2-3/8"CT FOR 2"CT. 18:00 - 23:00 BOPSUR P PRE START BOP TEST,RIGGING UP INNER REEL IRON AND BULKHEAD JUNCTION BOX. BOP TEST WITNESS WAIVED BY BOB NOBLE (AOGCC INSPECTOR). 23:00 - 00:00 BOPSUR N RREP PRE PUMP OUT STACK AND REPAIR UPPER PIPE RAM DOOR SEAL. -- 8/7/2010 00:00 - 05:00 BOPSUR P PRE CONTINUE TESTING BOPE. 7-1/16"x4-1/16" FLANGE IS LEAKING. 05:00 - 09:00 BOPSUR N RREP PRE SUCK DOWN BOP STACK.REMOVE CHINA HAT.REMOVE HOT TUB.RU BOP SLINGS TO BLOCKS&ATTACH TO BOP'S.BREAK 7-1/16"x4-1/16"FLANGE BOLTS.LIFT STACK& REPLACE RING GASKET.SET BOP'S DOWN. INSTALL&TIGHTEN FLANGE BOLTS. REMOVE LIFT SLINGS.INSTALL CHINA HAT& HOT TUB.FILL STACK WITH WATER.SHELL TEST BOP STACK. 09:00 - 13:00 BOPSUR P PRE CONTINUE TO TEST BOPE PER AOGCC REGS 250PSV3500PSI-PASS. 13:00 - 13:25 BOPSUR P PRE PJSM REGARDING PULLING TWC. Printed 9/20/2010 4:58:02PM North America -ALASKA- BP Page 2 of 2 F-04 :MOBILIZATION (MOB) :8/6/2010 :8/20/2010 X3-00VW8-C (701,875 00) : Prudhoe Bay : PB F Pad : NORDIC 1 :2/1/1971 12:00:00AM :NORDIC CALISTA :500292008900 :4:04 2/2/1971 00:00 @57.10ft(above Mean Sea Level) 13:25 - 13:50 BOPSUR P PRE HOIST DSM EQUIPMENT TO RF.MU DSM LUBRICATOR.STAB ONTO WELL. } 13:50 - 14:20 BOPSUR P PRE PRESSURE TEST DSM LUBRICATOR 250PSV3500PSI-PASS. 14:20 - 14:25 BOPSUR P PRE PULL TWC. RECOVERED 4"H TWC. 14:25 - 14:40 BOPSUR P PRE RD DSM LUBRICATOR. 14:40 - 14:55 BOPSUR P PRE PJSM TO PU INJECTOR AND PUMP SLACK. 14:55 - 18:15 BOPSUR P PRE PU INJECTOR 18:15 - 18:45 BOPSUR P PRE BOOT ELINE 18:45 - 19:30 BOPSUR P PRE FILL COIL WITH FRESH WATER. 19:30 - 20:00 BOPSUR P PRE LOTO REEL.CLOSE INNER REEL VALVE. PRESSURE TEST SURFACE LINE.500PSI LOW/4000PSI HIGH 20:00 - 20:15 BOPSUR P PRE PJSM TO CUT COIL.PUMP SLACK INTO REEL AT 2.8BPM. 20:15 - 21:00 BOPSUR P PRE CUT 300'COIL. 21:00 - 21:30 BOPSUR P PRE MU BOT CTC AND PULL TEST TO 30K. 21:30 - 21:50 BOPSUR P PRE MU STINGER AND SWIZZLE STICK,STAB ON WELL AND PUMP SLACK FORWARD. 21:50 - 22:50 BOPSUR P PRE TOOK 7 BBLS TO FILL WELL.POP OFF WELL HEAD AND WATCH FOR FLOW.TEST ELINE FOR CONTINUITY-TEST GOOD.REHEAD BHI. NO FLOW. 22:50 - 23:20 BOPSUR P PRE MU PLATE AND TEST UQC TO 4000PSI. 23:20 - 23:50 BOPSUR P PRE MU WINDOW MILLING BHA#1-WINDOW MILL, STRING MILL,EXTREME MOTOR, CENTRALIZER,2 JTS PH6, BLIND SUB,DGS, DPS, EDC, PC,WEAR SUB, LQC,UQC AND CTC. 23:50 - 00:00 BOPSUR P PRE STAB INJECTOR ON WELL AND PUMP SLACK FORWARD AT 2.34BPM. Printed 9/20/2010 4:58.02PM North America -ALASKA- BP Page 1 of 13 Operation Summary Report Common Well Name:F-04 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:8/7/2010 End Date: 8/18/2010 X3-00VW8-C(1,270,700.00) I Project:Prudhoe Bay Site:PB F Pad Rig Name/No.: NORDIC 1 Spud Date/Time:2/1/1971 12:00:00AM Rig Release: Rig Contractor:NORDIC CALISTA UWI:500292008900 Active Datum:4:04 2/2/1971 00:00 @57.10ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 8/8/2010 00:00 - 02:00 2.00 STMILL P WEXIT RIH WITH WINDOW MILLING BHA#1 02:00 - 04:00 2.00 STMILL P WEXIT LOGGING A TIE IN PASS FROM 8500'DOWN TO 8700'AT 1.5FPM.CORRECTION-25' 04:00 - 05:45 1.75 STMILL P WEXIT TAG WHIPSTOCK AT 9,649' AND DISPLACE WELLBORE TO 10.3PPG SODIUM BROMIDE _ MUD 05:45 - 18:00 12.25 STMILL P WEXIT °TIME MILL WINDOW FROM 9648.9FT USING 10.2PPG FLO-PRO AT 2.11 BPM/3675 �_ fz FS,100-200PSI MW,1FT/HR ROP,2.0-2.5K U WOB,11 PPG ECD,PVT 346.BLEED OFF IA FROM 550PSI TO 90PSI IN 5 MIN TO TIGER TANK.BLEED OFF OA TWICE FROM 200PSI T TO OPSI IN 2 MIN TO SLOP TRAILER,OOA TRACKED SAME.BEGIN MIXING ASPHASOL& RESINEX INTO MUD SYSTEM.300PSI INCREASE AFTER MIXING WAS COMPLETE. 18:00 - 21:20 3.33 STMILL P WEXIT CONTINUE MILLING WINDOW AT 9655.4' 2.11 BPM,2.0-3.0K WOB,PVT=348 LOOKS LIKE THE CENTRALIZER ABOVE THE MOTOR IS HANGING UP ON THE TOP OF THE WHIPSTOCK,TRYING MORE WEIGHT TO GET OVER THE HANG UP.MILLED OFF NICE. 21:20 - 23:10 1.83 STMILL P WEXIT CONTINUE MILLING WINDOW AT 9656.1' 2.11 BPM,1.3-1.5K WOB,PVT 347 MILLING OFF AND TAKING ANOTHER BITE EVERY 9 MINUTES. 23:10 - 00:00 0.83 STMILL P WEXIT DRILL RAT HOLE FROM 9,656.8'to 9,663'. 8/9/2010 00:00 - 01:20 1.33 STMILL P WEXIT FINISHED MILLING WINDOW AND 10'OF KINGAK.MUD SAMPLE SHOWS SHALE. 01:20 - 01:30 0.17 STMILL P WEXIT BACK REAM UP AND DOWN THREE TIMES AT 1FPM. 01:30 - 02:05 0.58 STMILL P WEXIT DRY DRIFT THROUGH WINDOW CLEAN. POOH. 02:05 - 02:30 0.42 STMILL P WEXIT LOG UP FROM TUBING TAIL TO FIRST GLM. MINUS 18'CORRECTION TO TUBING SUMMARY DATED 9/12/2008. 02:30 - 04:00 1.50 STMILL P WEXIT POOH 04:00 - 04:30 0.50 STMILL P WEXIT LD MILLING BHA#1.MILLS WERE 3.79" NO-GO. 04:30 - 05:00 0.50 DRILL P INT1 PJSM TO MU BHA#2. FLOW CHECK WELL-NO FLOW. 05:00 - 05:30 0.50 DRILL P INT1 MU BHA#2 (4.25"BICENTER BIT W/1 PLUGGED WING PORT,X-TREME MOTOR, HOT, DGS, DPS,EDC,POWERCOMMS,SUB WEAR PROTECTION,LQC,UQC,CTC). 05:30 - 07:10 1.67 DRILL P INT1 STAB INJECTOR AND RIH.CIRC MIN RATE THROUGH THE BIT 0.24BPM/1040PSI. 07:10 - 07:50 0.67 DRILL P INT1 LOG DOWN FOR TIE-IN FROM 8500FT.PLUS 24.5FT CORRECTION. 07:50 - 08:20 0.50 DRILL P INT1 CONTINUE TO RIH,PUMP MIN RATE THROUGH BIT AT 0.25BPM/1020PSI. 08:20 - 08:30 0.17 DRILL P INT1 DRILL INTERMEDIATE FROM 9666FT USING 10.3PPG FLO-PRO AT 2.21 BPM,4040PSI.NO TAG SEEN.STOP AT 9670FT&ACCESS. 08:30 - 08:50 0.33 DRILL P INT1 PUH TO RE-LOG. Printed 9/20/2010 4:51:15PM North America -ALASKA- BP Page 2 of 13 Operation Summary Report Common Well Name:F-04 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:8/7/2010 End Date: 8/18/2010 X3-00VW8-C(1,270,700.00) Project:Prudhoe Bay Site:PB F Pad Rig Name/No.: NORDIC 1 Spud Date/Time:2/1/1971 12:00:OOAM Rig Release: Rig Contractor:NORDIC CALISTA UWI:500292008900 Active Datum:4:04 2/2/1971 00:00 @57.10ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr (ft) 08:50 - 09:15 0.42 DRILL P INT1 RESET DATABASE. LOG DOWN FOR TIE-IN FROM 8500FT.MINUS 49FT CORRECTION. 09:15 - 09:45 0.50 DRILL P -_ INT1 RIH.CIRCULATE 0.5/900PSI.WINDOW WAS CLEAN. 09:45 - 10:50 1.08 DRILL P INT1 DRILL INTERMEDIATE 180TF FROM 9666FT USING 10.3PPG FLO-PRO AT 2.20BPM, 4000PSI,85-300PSI MW,8-35FT/HR ROP, 1.25-2.3K WOB,11.13PPG ECD,PVT=344. DRILL TO 9671 FT.PUH TO VERIFY WOB,1 PLUGGED JET,WOB WENT TO O. 10:50 - 12:00 1.17 DRILL P INT1 DRILL INTERMEDIATE 180TF FROM 9671FT USING 10.3PPG FLO-PRO AT 2.00BPM, 3875PSI,85-100PSI MW,8-10FT/HR ROP, 3.25-4.0K WOB,11.10PPG ECD,PVT=344. DRILL TO 9674FT.PVT 344. 12:00 - 13:30 1.50 DRILL P INT1 POH. 13:30 - 13:45 0.25 DRILL P ® INT1 FLOW CHECK&PJSM REGARDING HANDLING BHA. 13:45 - 14:40 0.92 DRILL P INT1 POP OFF&INSPECT 50FT ABOVE CTC.BIT WAS 1-1&PLUGGED NOZZLE ON NOSE.LD MOTOR.MU NEW MOTOR&RERUN BIT W/2 PRE PLUGGED WING PORTS.STAB ONTO WELL. 14:40 - 16:05 1.42 DRILL P ®_ INT1 RIH BUILD BHA(BHA#3).CIRCULATE 0.5BPM/1280PS1 WHILE RIH. 16:05 - 16:25 0.33 DRILL P -_ INT1 LOG DOWN FOR TIE-IN FROM 8500FT.MINUS 26FT CORRECTION. 16:25 - 16:50 0.42 DRILL P INT1 RIH,CIRCULATE 0.5BPM/1238PSI. 16:50 - 20:00 3.17 DRILL P INT1 DRILL INTERMEDIATE 180TF FROM 9676FT USING 10.3PPG FLO-PRO AT 2.15BPM, 4035PSI,100-300PSI MW,8-15FT/HR ROP, 1.25-2.3K WOB,11.12PPG ECD,PVT=344. MW IS MORE RESPONSIVE. 20:00 - 21:45 1.75 DRILL P ■- INT1 DRILL INTERMEDIATE SECTION FROM 9703'-9726'.2.10 BPM,FS 3980PSI,MW 200PSI, ECD 11.06,ROP 9FPH,PVT 345. 21:45 - 22:00 0.25 DRILL P INT1 WIPER TRIP FROM 9726'-9660'.CLEAN 22:00 - 22:45 0.75 DRILL P INT1 DRILL INTERMEDIATE SECTION FROM 9726'-9732'.2.10 BPM,FS 4050PSI,MW 200PSI, ECD 11.06, ROP 9FPH,PVT 345. BLEED OOA FROM 265PS1 TO OPSI. 22:45 - 00:00 1.25 DRILL P ■- INT1 FS LOST A DROPPED TO FROM A BIT NOZZLE MAY HAVE LOST A PLUG FROM A BIT NOZZLE.DRILLING NORMAL. 8/10/2010 00:00 - 01:30 1.50 DRILL P ■- INT1 DRILL INTERMEDIATE SECTION FROM 9740'-9750'.2.11 BPM,ROP=6.7FPH, ECD 11.06, PVT 345.FS 4080PS1.MW 200 PSI. 01:30 - 02:10 0.67 DRILL P INT1 9753'FS DROPPED TO 3800PS1.DRILLING BREAK ROP TO 27FPH.DRILLED 5'MORE AND CLEAN HOLE WHILE CIRC MUD SAMPLE TO SURFACE. 02:10 - 02:50 0.67 DRILL P INT1 BACK REAMING FROM TD UP TO WINDOW. 10 FPM,MAX RATE 2.20 BPM,4000PSI. SLOWDOWN AND PUMP MIN RATE ACROSS WINDOW. Printed 9/20/2010 4:51:15PM * North America -ALASKA- BP Page 3 of 13 Operation Summary Report Common Well Name:F-04 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:8/7/2010 End Date: 8/18/2010 X3-00VW8-C(1,270,700.00) Project:Prudhoe Bay Site:PB F Pad Rig Name/No.: NORDIC 1 1 Spud Date/Time:2/1/1971 12:00:00AM Rig Release: Rig Contractor:NORDIC CALISTA UWI:500292008900 Active Datum:4:04 2/2/1971 00:00 @57.10ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations hr ft) 02:50 - 04:20 1.50 DRILL P INT1 OPEN EDC AT WHIPSTOCK,PUMP 2.45BPM, 4000PSI,UP WT 32.7K,DN WT 20.3K,PVT=345. PULLING AN EXTRA 1.8K UP,PROBABLY CUTTINGS.AT TUBING TAIL TRIED TO TURN AROUND AND GO DOWN.STACKED OUT, CAME UP HOLE AND THEN TRIED AGAIN. WENT BACK DOWN TO WHIPSTOCK. _ 04:20 - 05:20 1.00 DRILL P INT1 MAKING ANOTHER CLEAN OUT PASS THROUGH THE 7"FROM WHIPSTOCK TO TUBING TAIL.PUMPING AT 2.61 BPM,4275 PSI,ECD 11.14,UP WT 32K,27FPM. 05:20 - 05:30 0.17 DRILL P INT1 GEO LOOKED AT SAMPLE AND DIRECTED US TO DRILL 5'MORE THEN CIRC UP SAMPLE FOR HIM.DRILLING FROM 9758'TO 9763',FS 3911 PSI,2.11 BPM, ECD=11.07,MW=200PSI, ROP=40FPH 05:30 - 07:00 1.50 DRILL P INT1 MAKING ANOTHER CLEAN OUT PASS THROUGH THE 7"FROM WHIPSTOCK TO 8000FT.PUMPING AT 2.51 BPM,4105 PSI, ECD 11.16,UP WT 32.7K,14FPM.CIRCULATING BOTTOMS UP FOR A SAMPLE WHILE CLEANING HOLE.NO SUBSTANCIAL AMOUNT OF CUTTINGS COMING OVER THE SHAKER. GEO CONFIRMS SAG SANDSTONE IN SAMPLES. 07:00 - 07:35 0.58 DRILL P - INT1 RIH,CIRCULATE 2.5BPM/4200PSI WITH 2.9BPM OUT.STOP AT 9600FT&CLOSE EDC. 07:35 - 07:50 0.25 DRILL P INT1 RIH,CIRC THROUGH BIT AT 0.3BPM/950PSI WHILE LOGGGING DOWN FOR TIE-IN ACROSS RA TAG.WINDOW WAS CLEAN. PLUS 4FT CORRECTION. 07:50 - 08:00 0.17 DRILL P -_ INT1 WIPER TO TD USING 1.2BPM/2200PSI.TAG TWICE AT 9766FT. 08:00 - 08:30 0.50 DRILL P INT1 BACKREAM AT 5FT/MIN USING 2.2BPM/3800PSI.STALL AT 9700FT.WIPER TO TD USING REDUCED RATE.BACKREAM AT 10FT/MIN USING 2.2BPM/4000PSI-CLEAN. PULL THROUGH WINDOW USING MIN RATE, 0.4BPM/1000-SLIGHT BOBBLE AT TOWS. ***CONDUCT SPILL DRILL&AAR*** 08:30 - 09:45 1.25 DRILL P INT1 OPEN EDC.JET WITH EDC TO 9650FT(EDC DEPTH)USING 2.35BPM/3800PSI.BOBBLE AT 9653FT&SET DOWN AT 9685FT.PULL THROUGH WINDOW,OP AT 9653FT&9640FT. WE ARE FIGTHING END STOPS RESULTING IN THE SET DOWNS&OP'S.STOP AT 9627FT CLOSE EDC.RIH TO 9700FT PUMPING 0.25BPM/900PSI-ALL CLEAN.PUH TO 9630FT PUMPING MIN RATE,0.25BPM/960PSI-ALL CLEAN. REPEAT TWICE-SAME RESULTS. RIH TO 9700FT,OPEN EDC.JET WS TRAY WHILE PUH AT 2.4BPM/3800PS1-WINDOW WAS CLEAN. NO ISSUES AT TT.JET TO 8400FT PAIT EOP RED,WHITE&BLUE FLAG. 09:45 - 11:25 1.67 DRILL P -_ INT1 POH JETTING THROUGH EDC AT 2.4BPM/3800FT.JOG AT SURFACE. 11 25 - 11:40 0.25 DRILL P -_ INT1 FLOW CHECK&PJSM REGARDING HANDLING BHA. Printed 9/20/2010 4:51.15PM • North America -ALASKA- BP Page 4 of 13 Operation Summary Report Common Well Name: F-04 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:8/7/2010 End Date:8/18/2010 X3-O0VW8-C(1,270,700.00) Project:Prudhoe Bay Site:PB F Pad Rig Name/No.:NORDIC 1 Spud Date/Time:2/1/1971 12:00:00AM Rig Release: Rig Contractor:NORDIC CALISTA UWI:500292008900 Active Datum:4:04 2/2/1971 00:00 @57.10ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 11:40 - 12:15 0.58 DRILL P INT1 POP OFF WELL. BLOW DOWN&LD BHA. BIT WAS 1-1 &STILL HAD PLUGGED WING PORTS.CLEAN RF&BREAK DOWN BHI TOOLS. 12:15 - 16:10 3.92 CASING P INT1 MU 3-3/16"LINER&3-1/2"LINER&4-1/2" CASING ANCHOR,BAKER LOC ALL 3-3/16" LINER.PU COIL TRAC TOOLS&MU THE LINER. ***CONDUCT KICK WHILE DRILLING/NON SHEARABLE DRILL&AAR*** 16:10 - 18:45 2.58 CASING P INT1 RIH AT 70FT/MIN WITH LINER,PUMP THROUGH EDC AT 0.25BPM/800PSI. RIW=24K AT 9600FT.PUW=41K.CORRECT TO FLAG,MINUS 32FT CORRECTION. 18:45 - 19:00 0.25 CASING P INT1 RIH&SET DOWN AT 9681 FT TWICE„TURN PUMPS OFF,MADE IT TO 9691 FT.SET DOWN THREE TIMES AT THE SAME SPOT WITH 10K OP. 19:00 - 22:00 3.00 CASING N DPRB INT1 OPEN EDC. POH PUMPING ACROSS THE TOP,I BPM/18PSI WHP TO MWD TOOLS. 22:00 - 23:00 1.00 CASING N DPRB INT1 PJSM ON BREAKING DOWN LINER ASSEMBLY WITH EMPHASIS ON INSPECTING LIFTING EQUIPMENT AND DROPPED OBJECT PREVENTION. LAY DOWN MWD/CTC TOOLS AND BAKER LINER HANGER 23:00 - 00:00 1.00 CASING N DPRB INT1 POH AND LAY DOWN 3 1/2"STL LINER. 8/11/2010 00:00 - 02:00 2.00 CASING N DPRB INT1 POH,LAYING DOWN 3 1/2"STL LINER -TOTAL OF 33 JOINTS L-80 STL LINER LAID DOWN 02:00 - 05:15 3.25 CASING N DPRB INT1 POH WITH LAST 5 JOINTS OF 3 3/16"TC-II LINER ATTEMPT TO BREAK CONNECTION ON BAKERLOK'D CONNECTION ON FIRST JOINT OF TC-II LINER. CANNOT BREAK CONNECTION,DAMAGED LINER JOINT WITH TONGS. -CONSULT WITH NORDIC TOOLPUSHER AND TOWN. DECISION IS TO USE TORCH WITH ROSEBUD TIP TO APPLY HEAT. -PJSM ON USING TORCH. COMPLETE PERMIT,GATHER FIRE BLANKET AND PPE TO USE TORCH. -CONNECTION BROKE ON FIRST ATTEMPT; USE HEAT ON SECOND BREAK WITH GOOD RESULTS -LAST JOINT PACKED OFF;ATTEMPT TO CLEAN JOINT OUT BUT CANNOT CLEAR ALL THE WAY THROUGH. LAY JOINT DOWN. -2 JOINTS OUT-DAMAGED 05:15 - 06:00 0.75 CASING N DPRB - INT1 CLEAR AND CLEAN RIG FLOOR 06:00 - 06:20 0.33 CASING N DPRB _ INT1 C/O WITH NIGHT CREW&CONDUCT WALK AROUNDS. 06:20 - 06:30 0.17 CASING N DPRB - INT1 PJSM REGARDING HANDLING DRILLING BHA. 06:30 - 07:05 0.58 CASING N DPRB - INT1 MU CLEAN OUT DRILLING BHA.MU INJECTOR TO BHA.STAB ONTO WELL.POWER UP& TEST TOOLS.SET COUNTERS. Printed 9/20/2010 4:51:15PM • North America -ALASKA- BP Page 5 of 13 Operation Summary Report Common Well Name: F-04 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date: 8/7/2010 End Date: 8/18/2010 X3-00VW8-C(1,270,700.00) Project:Prudhoe Bay Site: PB F Pad Rig Name/No.:NORDIC 1 Spud Date/Time:2/1/1971 12:00:00AM Rig Release: Rig Contractor:NORDIC CALISTA UWI:500292008900 Active Datum:4:04 2/2/1971 00:00 @57.10ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations hr) (ft) 07:05 - 08:35 1.50 CASING N DPRB INT1 RIH,CIRC 0.21 BPM/930PSI.RUN THROUGH WINDOW WITH MIN RATE 0.2BPM/960PSI- CLEAN.LOG DOWN FOR TIE-IN ACROSS RA TAG,MINUS 24.5FT.RIH PUMPING 0.2BPM/960PSI.WT BOBBLES AT 9702FT, 9708FT,9715FT&SET DOWN AT 9723FT.BIT STUCK.WORK FREE.WIPER TO WINDOW AT 2.2BPM/4150PSI.RIH&SET DOWN AT 9723FT. BIT STUCK AGAIN.WORK FREE.WIPER TO THE WINDOW. 08:35 - 09:30 0.92 CASING N DPRB - INT1 PUH TO 9300FT AT 10FT/MIN, 2.2BPM/4150PSI.RIH AT 100FT/MIN. 09:30 - 11:20 1.83 CASING N DPRB INT1 RIH PAST WINDOW.LOG ACROSS RA TAG, PLUS 6FT CORRECTION.REAM DOWN AT 1.7BPM/2790FT AT 100FT/HR.BOBBLE AT 9702FT.SET DOWN AT 9752FT.TAG TD AT 9764.6FT. 11:20 - 12:10 0.83 CASING N DPRB INT1 BACKREAM AT 1.5FT/MIN,2.23BPM/4200PSI. NO MW OR OP'S-ALL CLEAN.PULL THROUGH WINDOW-CLEAN. 12:10 - 15:15 3.08 CASING N DPRB INT1 PUMP THROUGH BIT AT 2.2BPM/4200PSI WHILE PUH AT 15FT/MIN.PUH TO TT.RIH TO TOWS,AT 8800FT OUT MM PLUGGED UP& RECOVERED A PIECE OF ANNULAR BAG RUBBER.RIH TO TOWS.PUH AT 10FT/MIN. RIH TO TOWS.BOTTOM'S UP BOTH TIMES WERE MINIMAL AMOUNT OF CUTTINGS. 15:15 - 17:30 2.25 CASING N DPRB INT1 RUN PAST WS PUMP MIN RATE,SLIGHT TAG AT TOWS&BOW.RIH TO 9762FT-VERY SLIGHT MW AT 9715FT,9731 FT,9739FT OTHERWISE CLEAN.PUMP 25BBLS OF 10.8PPG 8%KCL LO VIS SWEEP,FOLLOWED BY 33BBLS OF 10.3PPG 8%KCL FLO-PRO HI VIS SWEEP,CHASED WITH 10.3PPG 8%60K LSRV FLO-PRO DRILLING MUD TO TUBING TAIL.RECIPROCATE IN OH SECTION AT 2FT/MIN RIH&1.5FT/MIN PUH-CLEAN. 17:30 - 17:35 0.08 CASING N DPRB _ INT1 RIH.BOTTOM'S UP WAS CLEAN,BLACK PRODUCT ROLLING OFF SHAKER. 17:35 - 18:05 0.50 CASING N DPRB A • : • I GET BOBBLE AT 9715FT 9720FT AT 20FT/MIN.RECIPROCATE-CLEAN. LAY IN 3OBBL 11.2PPG 6%KCL HEAVY WEIGHT PILL IN OH SECTION-CLEAN 18:05 - 21:00 2.92 CASING N DPRB INT1 POH TO TT AT 24FT/MIN,PUMP 2.2BPM/4100FT THROUGH THE BIT.STOP AT 8400FT&PAINT A WHITE FLAG. CONTINUE POH TO SURFACE. -MW IN 10.3 PPG,MW OUT 10.4 PPG 21:00 - 21:30 0.50 CASING N DPRB - INT1 LAY DOWN CLEANOUT BHA. 21:30 - 22:45 1.25 CASING N DPRB - INT1 RU TO PUMP OUT SLACK IN COIL E-LINE. PUMP OUT 251'OF SLACK IN LINE. CUT LINE. CLEAN RIG FLOOR. 22:45 - 23:00 0.25 CASING N DPRB _ INT1 PJSM ON CUTTING COIL TUBING 23:00 - 00:00 1.00 CASING N DPRB INT1 CUT COIL CONNECTOR AND 100'OF TUBING. ATTACH EXTERNAL GRAPPLE COIL CONNECTOR. CUT,HEAT-SHRINK SEAL E-LINE. Printed 9/20/2010 4:51:15PM North America -ALASKA- BP Page 6 of 13 Operation Summary Report Common Well Name:F-04 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:8/7/2010 I End Date: 8/18/2010 X3-00VW8-C(1,270,700.00) Project: Prudhoe Bay Site: PB F Pad Rig Name/No.: NORDIC 1 Spud Date/Time:2/1/1971 12:00:00AM Rig Release: Rig Contractor:NORDIC CALISTA UWI:500292008900 Active Datum:4:04 2/2/1971 00:00©57.10ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 8/12/2010 00:00 - 00:30 0.50 CASING N DPRB INT1 CONDUCT PULL TEST AND PRESSURE TEST BAKER EXTERNAL GRAPPLE COIL TUBING CONNECTOR(CTC)TO 4000 PSI AGAINST MANUAL VALVE ON TREE. UNABLE TO GET PRESSURE TEST. RE-DRESS E-LINE WITH HEAT-SHRINK WRAP AND MAKE UP EXTENSION TO PRESSURE TEST. PT TO 4000 PSI. 00:30 - 01:45 1.25 CASING N DPRB INT1 MU"SWIZZLE STICK"WITH BALL CATCHER ATTACHMENT TO CTC;JET STACK. DROP 3/4"BALL FOR DRIFT RUN DURING CIRCULATION TO ENSURE COIL IS CLEAR OF E-LINE BLOCKAGE. 01:45 - 06:00 4.25 CASING N DPRB INT1 PJSM ON RUNNING LINER ASSEMBLY. RU TO RUN LINER ASSEMBLY. MU LINER ASSEMBLY,BAKERLOK BULL NOSE AND FIRST FIVE JOINTS: -3-3/16"BULL NOSE,5 JTS 3-3/16"TC-II TUBING,3-3/16"BY 3-1/2"XO,33 JTS 3-1/2" STL TUBING,3-1/2"PUP JT,DEPLOYMENT SLEEVE, BAKER CTLRT,5 JTS 2-3/8"PH6 PIPE(FOR E-LINE SPACEOU 06:00 - 09:00 3.00 CASING N DPRB INT1 BREAK CIRCULATION.0.3BPM/1300PSI.RIH WITH LINER ASSEMBLY.CORRECT DEPTH TO FLAG DEPTH.23K RIW,40K PUW.PUMP 1 BPM/1800PSI.SET DOWN AT 9706FT.SET 10K DOWN&POPPED FREE.TAG AT 9767FT PU&REPEAT.SAME. INCREASE TO 2BPM/2800PSI,NO MOVEMENT. 09:00 - 09:35 0.58 CASING P INT1 LAUNCH 5/8"BALL TO RELEASE FROM ■ CTLRT.BALL LANDED AT 26BBLS,SHEARED AT 4000PSI.28K PUW. 09:35 - 11:00 1.42 CASING P INT1 POH. 11:00 - 12:10 1.17 CASING P INT1 FLOW CHECK. POP OFF&PLACE INJECTOR OVER BUNG HOLE.LD CTLRT BHA. RECOVERED 5/8"BALL. LD BOT TOOLS TO GROUND. 12:10 - 14:50 2.67 CASING P INT1 CUT OFF BOT CTC.SEAL E-LINE.STAB ONTO WELL.REVERSE CIRCULATE E-LINE SLACK INTO REEL.POP OFF.CUT 335FT COIL TO FIND WIRE. INSTALL SLB DIMPLE CTC.PULL TEST TO 35K&PRESSURE TEST CTC TO 3800PS1.MU BHI UQC. 14:50 - 15:55 1.08 FISH P ■- INT1 SHOE MILLING HA. COIL BHA. STAB POWER ONTO WELL.POWER ER UP&TEST TOOLS.SET COUNTERS.OPEN EDC. 15:55 - 17:35 1.67 FISH P Map RIH WITH MILLING BHA(BHA#7). 17:35 - 18:20 0.75 FISH P INT1 CLOSE EDC. • •r OL FROM 8 00FT K TO 8700FT. INER TOP AT 8551' _ k 3 nL 18:20 - 19:30 1.17 FISH P INT1 CONTINUE • - '' ING BHA. CONFIRM RA TAG AT 9655'.TAG LINER BULL NOSE GUIDE SHOE AT 9763'WITH PUMPS ON. PICK UP,RUN BACK IN HOLE WITH PUMPS OFF AND TAG AT 9762'. Printed 9/20/2010 4:51:15PM North America -ALASKA- BP Page 7 of 13 Operation Summary Report Common Well Name: F-04 l AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date:8/7/2010 End Date: 8/18/2010 X3-00VW8-C(1,270,700.00) Project:Prudhoe Bay Site:PB F Pad Rig Name/No.: NORDIC 1 Spud Date/Time:2/1/1971 12:00:00AM Rig Release: Rig Contractor:NORDIC CALISTA UWI:500292008900 Active Datum:4:04 2/2/1971 00:00 @57.10ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) ft 19:30 - 23:00 3.50 FISH P INT1 RFGIN CONCURRFNT MILLING AND DISPLACEMENT OPERATIONS -CONFIRM TAG WITH PUMPS ON -DISPLACE FROM 10.3 PPG FLO-VIS TO 8.6 PPG POWER-VIS -MILLING WITH 750 LBS WOB,4860 PSI OFF, 5490 PSI ON -OBSERVE CUTTINGS ACROSS SHAKERS, CANNOT FIND METAL SHAVINGS -DRILL AHEAD IN NEW HOLE TO 9772'WITH 4800-5100 PSI ON,1900-3300 FT/LBS WOB 23:00 - 23:30 0.50 EVAL P . INT1 CIRCULATE FOR GEO SAMPLES. BOTTOMS UP SHOWS SOME SAND,MOSTLY SHALE. 23:30 - 00:00 0.50 FISH P . INT1 MONITOR WELL. POH AT 1.5 BPM,2400-2600 PSI 8/13/2010 00:00 - 02:00 2.00 FISH P INT1 POH WITH MILLING BHA. TAG,RUN BACK INTO HOLE TO PUMP AND CLEAN TOP OF BHA. POH TO BHA. 02:00 - 02:30 0.50 FISH P ® INT1 PJSM ON LAYING DOWN BHA. LAY DOWN MILLING BHA. MILL IN GAUGE. 02:30 - 03:00 0.50 DRILL P PROD1 FUNCTION TEST BOP EQUIPMENT. /fin CONCURRENT OPS:CHANGE OUT COUNTER (J" WHEEL. 03:00 - 03:15 0.25 DRILL P PROD1 PJSM ON MAKING UP DRILLING BHA MU DRILLING BHA:3"BI-CENTER BIT,2 3/8"BHI X-TREME MOTOR WITH 1.1 DEG BEND,HOT, DGC,DPS,EDC,POWERCOMMS,WEAR SUB, LQC,UQC,CTC -MW8.7PPG 03:15 - 05:30 2.25 DRILL P PROD1 RIH WITH DRILLING BHA AT 1 1/2 BPM,2970 PSI. TIE-IN WITH RA TAG AT 9655'; MINUS 16' CORRECTION. 05:30 - 10:00 4.50 DRILL P PROD1 DRILL BUILD 170TF FROM 9762FT USING 8.7PPG POWER-VIS AT 1.60BPM,3000PSI, 100-150 PSI MW,30-80 FT/HR ROP,1.25-2.8K WOB,10.13PPG ECD,PVT=344.BEGIN CENTRIFUGING MUD. DRILL TO 9900FT. PVT=325. 10:00 - 10:07 0.12 DRILL P -_ PROD1 WIPER TO THE SHOE.WITH REDUCED RATE AT 9770FT TO 0.4BPM/1700PSI.CLEAN. 10:07 - 10:25 0.30 DRILL P PROD1 MAD PASS FROM 9760FT-9762FT. 10:25 - 10:30 0.08 DRILL P PROD1 WIPER TO TD, 1.6BPM/3100PSI.CLEAN. 10:30 - 14:30 4.00 DRILL P PROD1 DRILL BUILD 100-180TF FROM 9900FT USING 8.7PPG POWER-VIS AT 1.60BPM,3020PSI, 150-300 PSI MW,40-80 FT/HR ROP,1.25-2.2K WOB,10.2PPG ECD,PVT=337.DRILL TO 10021 FT&STARTED TO TAKE 0.25BPM LOSSES&HEALED QUICKLY.CONTINUE TO DRILL AHEAD.DRILL TO 10050FT. 14:30 - 14:50 0.33 DRILL P -_ PROD1 WIPER TO THE SHOE&TO TD, 1.75BPM/3200PSI CLEAN. 14:50 - 18:00 3.17 DRILL P PROD1 DRILL BUILD 100-180TF FROM 10050FT USING 8.7PPG POWER-VIS AT 1.60BPM,3050PSI, 175-300 PSI MW,10-15 FT/HR ROP,1.25-2.2K WOB,10.24PPG ECD,PVT=337.INCREASE PUMP RATE TO 1.75BPM.ROP INCREASED TO 30-45FT/MIN.FS=3350PSI.DRILL TO 10105FT Printed 9/20/2010 4:51:15PM • North America -ALASKA- BP Page 8 of 13 Operation Summary Report Common Well Name:F-04 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:8/7/2010 End Date:8/18/2010 X3-00VW8-C(1,270,700.00) Project:Prudhoe Bay Site: PB F Pad Rig Name/No.:NORDIC 1 Spud Date/Time:2/1/1971 12:00:00AM Rig Release: Rig Contractor:NORDIC CALISTA UWI:500292008900 Active Datum:4:04 2/2/1971 00:00 @57.10ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 18:00 - 22:45 4.75 DRILL P PROD1 DRILL BUILD 60-90TF FROM 10105FT USING 8.7PPG POWER-VIS AT 1.80BPM,3420PS1, 150-250 PSI MW,20-40 FT/HR ROP,1.25-2.2K WOB,10.25PG ECD,PVT=340. 22:45 - 23:15 0.50 DRILL P PROD1 DIFFICULTY TRANSFERRING TO WOB,ROP SLOWED DOWN TO 10 FT/HR. WIPER TRIP TO RA TAG AT 1.4 BPM,2950 PSI. PLUS 2' CORRECTION OF DEPTH. RUN BACK IN HOLE AT 1 BPM,3000 PSI. 23:15 - 00:00 0.75 DRILL P PROD1 DRILL BUILD 330-340TF FROM 10190FT USING 8.7PPG POWER-VIS AT 1.75BPM,3290PSI, 150-250 PSI MW,20-30 FT/HR ROP,1.15-1.4K WOB,10.25PG ECD, PVT=335. CANNOT MAKE PROGRESS,DISCUSSION WITH TEAM RESULTS IN POH. 8/14/2010 00:00 - 02:00 2.00 DRILL P PROD1 POH WITH DRILLING BHA AT 1.9 BPM,3030 ■ -MI. MW IN AND OUT 8.8 PPG 02:00 - 02:15 0.25 DRILL P PROD1 TAGGED UP AT SURFACE WITH COIL TUBING CONNECTOR. RUN BACK IN HOLE TO 500' TO CIRCULATE TOP OF BHA CLEAN. PULL BACK UP OUT OF HOLE TO BHA. 02:15 - 03:15 1.00 DRILL R PROD1 BRING BHA TO SURFACE FOR BIT SWAP. BIT WELL WORN. -BIT GRADE OF PULLED BIT: 4-2-RO-A-X-I-BT-PR -CONCURRENT OPS: SLB MECHANICS INSPECTED TRACTION MOTOR AND ALIGNMENT OF HYDRAULIC GEARS. BLOWER FAN WILL NEED TO BE REPLACED ON NEXT TRIP OUT OF HOLE. NOT CRITICAL AND CAN WAIT UNTIL ELECTRICIAN CAN MAKE IT TO RIG. 03:15 03:30 0.25 DRILL P ®- PROD1 HCC RE-BUILT "BI-CENTER BIT WI TH P LUGGED WING PORT TO PREVIOUS BHA 03:30 - 05:45 2.25 DRILL P PROD1 RIH WITH DRILLING BHA ON COIL TUBING AT 0.35 BPM,1370 PSI. TIE-IN WITH RA TAG AT 9655. CORRECTION OF MINUS 18.5'. CONTINUE TO RIH TO TD. 05:45 - 06:00 0.25 DRILL P PROD1 DRILL BUILD 330-340TF FROM 10196FT USING 8.8PPG POWER-VIS AT 1.6 BPM,3380 PSI ON, 3150 OFF,230 PSI MW,15 FT/HR ROP, 0.65-0.75 WOB,10.30PG ECD,PVT=324. 06:00 - 07:05 1.08 DRILL P PROD1 DRILL BUILD 290-340TF FROM 10196FT USING 8.8PPG POWER-VIS AT 1.6 BPM,3380 PSI ON, 3150 OFF,180-230 PSI MW,15-60 FT/HR ROP, 0.65-1.75 WOB,10.35PG ECD,PVT=324. DRILL TO 10250FT.PVT=323. 07:05 - 07:30 0.42 DRILL N SFAL 10,250.00 PROD1 WIPER TO THE SHOE&PREP TO C/O SLB TRACTION BLOWER MOTOR.PUMP 1.65BPM/3160PSI,33K PUW.OH IS CLEAN. WITH REDUCED RATE PULL THROUGH THE SHOE-CLEAN.STOP AT 9700FT&STOP PUMPING.OPEN EDC. Printed 9/20/2010 4:51:15PM North America -ALASKA- BP Page 9 of 13 Operation Summary Report Common Well Name: F-04 1AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date: 8/7/2010 End Date: 8/18/2010 X3-00VW8-C(1,270,700.00) Project:Prudhoe Bay Site:PB F Pad Rig Name/No.: NORDIC 1 Spud Date/Time:2/1/1971 12:00:00AM Rig Release: Rig Contractor:NORDIC CALISTA UWI:500292008900 Active Datum:4:04 2/2/1971 00:00 @57.10ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 07:30 - 08:25 0.92 DRILL N SFAL PROD1 PUH ABOVE THE 3-1/2"INTERMEDIATE STRING,PUMP 2.38BPM/3600PSI.CIRCULATE BOTTOM'S UP.STOP AT 8497FT&STOP PUMPING.CLOSE ANNULAR TO CENTER COIL,CLOSE UPPER 2"COMBI RAMS. PUSH/PULL COIL AGAINST UPPER COMBI'S- HOLDING.CIRCULATE AT MIN RATE 0.24BPM/1300PSI THROUGH EDC. 08:25 - 10:30 2.08 DRILL N SFAL PROD1 PERFORM LOTO ON SLB POWER PACK VIA NORDIC ELECTRICIAN.C/O SLB POWER PACK BLOWER MOTOR.OPEN COMBI RAM. PUH&INSPECT CT-OK 10:30 - 10:50 0.33 DRILL N SFAL PROD1 RIH TO 9600FT,CIRCULATE 1.5BPM/2500PSI. 10:50 - 11:10 0.33 DRILL N SFAL PROD1 LOG DOWN FOR TIE-IN FROM 9600FT ACROSS RA TAG.PLUS 1 FT CORRECTION. CLOSE EDC. _ 11:10 - 11:30 0.33 DRILL N SFAL PROD1 WIPER TO TD. 1.5BPM/2950PS1-CLEAN. 11:30 - 13:50 2.33 DRILL P PROD1 DRILL BUILD 280-330TF FROM 10249FT USING 8.8PPG POWER-VIS AT 1.70BPM,3200PSI, 150-250 PSI MW,40-60 FT/HR ROP,0.9-1.5K WOB,10.27PPG ECD,PVT=322.DRILL 10400FT.PVT=320. 13:50 - 14:45 0.92 DRILL P . PROD1 WIPER TO THE SHOE&TO TD. 1.7BPM/3200PSI.CLEAN BOTH WAYS. 14:45 - 17:00 2.25 DRILL P PROD1 DRILL BUILD 20-70TF FROM 10400FT USING 8.8PPG POWER-VIS AT 1.75BPM,3250PS1, 150-250 PSI MW,40-60 FT/HR ROP,0.9-1.5K WOB,10.27PPG ECD,PVT=318.DRILL 10400FT.PVT=320.ADJUST PUMP RATE TO 1.2BPM/2520 TO GET MORE DOG LEGS.DRILL TO 10485FT.PVT 313. 17:00 - 17:35 0.58 DRILL N DPRB 10,487.00 PROD1 WIPER TO THE SHOE,1.7BPM/3200PSI. CLEAN IN OH SECTION. 17:35 - 20:00 2.42 DRILL N DPRB 10,487.00 PROD1 OPEN EDC. POH WHILE JETTING AT 2.4BPM/3600PSI. TAG UP AT SURFACE WITH COIL TUBING,RUN BACK IN HOLE TO 500'TO CIRCULATE AND CLEAN ABOVE BHA. POH TO SURFACE TO INSPECT,CHANGE OUT BHA. 20:00 - 21:00 1.00 DRILL N DPRB 10,487.00 PROD1 DISCONNECT FROM CTC. BREAK OFF MWD TOOL AND BIT. BIT WORN,CHIPPED. -BIT GRADE:3-2-BT-A-X-I-CT-BHA -CHANGE OUT MWD FROM 1.1 DEG BEND TO 1.5 DEG BEND -MAKE UP MOTOR AND RE-BUILT BAKER 3" BI-CENTER BIT TO CTC. 21:00 - 23:45 2.75 DRILL N DPRB 10,487.00 PROD1 RUN BACK IN HOLE WITH NEW BIT AND BENT MOTOR ON PREVIOUS BHA AT.2 BPM,1465 PSI&REBUILT HCC WITH ALL OPEN PORTS. -SLOW TO 1000 FT/MIN RUNNING SPEED AT 8500'TO LOG FOR LINER TOP TIE-IN -CONTINUE TO RIH FOR RA TAG TIE-IN AT 9655'. TIE IN HAS MINUS 19'CORRECTION. 23:45 - 00:00 0.25 DRILL P PROD1 DRILL BUILD 350-0 TF FROM 10487-10500FT USING 8.8PPG POWER-VIS AT 1.60BPM, 3330PSI,140-150 PSI MW,40-60 FT/HR ROP, 0.9-1.3K WOB,10.35 PPG ECD,PVT=305 Printed 9/20/2010 4:51:15PM North America -ALASKA- BP Page 10 of 13 Operation Summary Report Common Well Name: F-04 AFE No Event Type: RE-ENTER-ONSHORE(RON) Start Date: 8/7/2010 End Date: 8/18/2010 X3-00VW8-C (1,270,700.00) Project: Prudhoe Bay Site: PB F Pad Rig Name/No.:NORDIC 1 Spud Date/Time:2/1/1971 12:00:00AM Rig Release: Rig Contractor:NORDIC CALISTA UWI:500292008900 Active Datum:4:04 2/2/1971 00:00 @57.10ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 8/15/2010 00:00 - 01:30 1.50 DRILL P PROD1 DRILL BUILD 350-0 TF FROM 10500-10500FT USING 8.8PPG POWER-VIS AT 1.60BPM, 3330PSI,140-150 PSI MW,40-60 FT/HR ROP, 0.9-1.3K WOB,10.35 PPG ECD,PVT=305 -GEO REQUEST FOR 25'SAMPLES FROM 10,500'TO 10,600'TO CONFIRM MHO/HOT MARKER AND GIVE DIRECTIONAL GUIDANCE 01:30 - 02:45 1.25 DRILL P PROD1 STOP DRILLING, PICK UP AND CIRCULATE SAMPLES UP WHILE CONDUCTING WIPER TRIP FROM 10,600'TO 9780'. SAMPLES SHOW START OF HOT AT 10,550'. GEO GIVES DD GUIDANCE TO COME UP APPROXIMATELY 3'. 02:45 - 05:00 2.25 DRILL P PROD1 BACK ON BOTTOM TO DRILL AHEAD. -DRILL BUILD 25-30 TF FROM 10600-10620 FT, TF 90-135 FROM 10620-10723 FT,AND TF 70-95 FROM 10723-10750 FT USING 8.8PPG POWER-VIS AT 1.60BPM,3330-3560PSI, 160-500 PSI MW,60-85 FT/HR ROP,.97-2.1K WOB,10.35-10.37 PPG ECD,PVT=288 AT TIME OF DISPLACEMENT 05:00 - 06:00 1.00 DRILL P PROD1 POH FOR MUD DISPLACEMENT TO CLEAN 8.8 PPG POWER-VIS MUD. -TRACKED PITS AS THEY ARE OFFLOADED TO TRUCKS -MANIFOLD LINED UP TAKING CLEAN FLUID OFF OF TRUCK STRAIGHT TO COIL TUBING -TIMING BHA TO TD WITH CLEAN FLUID AT BIT 06:00 - 07:00 1.00 DRILL P PROD1 DRILL LATERAL 9OR TF FROM 10750FT USING NEW 8.6PPG POWER-VIS AT 1.6 BPM,2700 PSI FS,100-175 PSI MW,130-160 FT/HR ROP, 0.75-1.75 WOB,10.12PPG ECD,PVT=13 (CONDUCTING MUD SWAP).DRILL TO 10875FT.2900PSI FS WITH NEW MUD ON SURFACE. 07:00 - 07:05 0.08 DRILL P PROD1 DRILL LATERAL 90L TF FROM 10875FT USING NEW 8.6PPG POWER-VIS AT 1.75 BPM,2900 PSI FS(NEW MUD ALL THE WAY AROUND), 100-150 PSI MW,130-160 FT/HR ROP, 0.75-1.70 WOB,9.84PPG ECD,PVT=25 STILL CONDUCTING MUD SWAP).DRILL TO 1091 OFT. 07:10 - 08:00 0.83 DRILL P PROD1 WIPER TO 9800FT&TO TD,1.75BPM/2800PSI -OH CLEAN.REDUCE TO MIN RATE AT 9800FT TO THE SHOE.PULL INTO THE SHOE- CLEAN.OPEN EDC AT 9750FT. 08:00 - 08:40 0.67 DRILL P PROD1 JET TO 8570FT THROUGH EDC, 2.75BPM/3570PSI.JET TO 9600FT. 08:40 - 08:50 0.17 DRILL P PROD1 LOG DOWN FOR TIE-IN FROM 9600FT,PLUS 5FT CORRECTION. 08:50 - 09:30 0.67 DRILL P PROD1 CLOSE EDC&WIPER TO TD, 1.75BPM/2800PS1-CLEAN. 09:30 - 11:20 1.83 DRILL P PROD1 DRILL LATERAL 90L TF FROM 10910FT USING NEW 8.6PPG POWER-VIS AT 1.77 BPM,2812 PSI FS,110-175 PSI MW,130-160 FT/HR ROP, 0.75-1.25 WOB,9.87PPG ECD,PVT=351 DRILL TO 11050FT 11:20 - 12:55 1.58 DRILL P PROD1 WIPER TO 9800FT&TO TD,1.75BPM/2850PS1 -CLEAN BOTH WAYS. Printed 9/20/2010 4:51:15PM North America -ALASKA- BP Page 11 of 13 Operation Summary Report Common Well Name: F-04 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:8/7/2010 End Date: 8/18/2010 X3-00VW8-C(1,270,700.00) Project:Prudhoe Bay Site: PB F Pad Rig Name/No.:NORDIC 1 Spud Date/Time:2/1/1971 12:00:00AM Rig Release: Rig Contractor:NORDIC CALISTA UWI:500292008900 Active Datum:4:04 2/2/1971 00:00 @57.10ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 12:55 - 13:50 0.92 DRILL P PROD1 DRILL LATERAL 90L-90R TF FROM 11050FT USING NEW 8.6PPG POWER-VIS AT 1.75 BPM, 2850 PSI FS,110-175 PSI MW,130-160 FT/HR ROP,0.75-1.205 WOB,9.89PPG ECD,PVT= 349 DRILL TO 11125FT 13:50 - 14:50 1.00 DRILL N PROD1 WIPER TO THE SHOE, 1.77BPM/2850-CLEAN. 14:50 - 15:20 0.50 DRILL N PROD1 -WITH REDUCED RATE,PULL THROUGH SHOE -CLEAN.OPEN EDC&JET TO 8500FT. 15:20 - 16:00 0.67 DRILL N PROD1 CLOSE UPPER COMBI RAMS.PULUPUSH TEST-OK.PERFORM LOTO ON TRACTION MOTOR.INSPECT SLB TRACTION MOTOR. BEARING IS BAD.OPEN COMBI RAMS.CHECK PIPE. 16:00 - 16:50 0.83 DRILL N PROD1 WIPER TO TD, 1.77BPM/2770PSI. 16:50 - 17:35 0.75 DRILL P PROD1 DRILL LATERAL 90L-90R TF FROM 11125FT USING 8.6PPG POWER-VIS AT 1.79 BPM,2775 PSI FS,100-150 PSI MW,130-160 FT/HR ROP, 0.75-1.10 WOB,9.91 PPG ECD,PVT=335 DRILL TO 11225FT.INSPECT SLB BEARING. 17:35 - 18:00 0.42 DRILL N PROD1 WIPER TO THE SHOE,1.75BPM/2760PSI.CALL SLB&DISCUSS HIGH BEARING TEMP. DECISION IS TO CHANGE OUT TRACTION MOTOR. 18:00 - 21:30 3.50 DRILL N SFAL PROD1 POH TO CHANGE OUT TRACTION MOTOR, WIPING AT 1.75 BPM,2780 TO 9800'. SHUT DOWN PUMPS FROM 9800'TO 9740'. OPEN EDC,JET LINER AT 2.4 BPM,2980 PSI. -STAND BACK BHA, BREAK OFF BIT. BIT GRADE:3-3-RO-A-X-I-BT-R I G -SECURE WELL -SLB LEADING MOBILIZATION OF MOTOR AND EQUIPMENT 21:30 - 00:00 2.50 DRILL N SFAL PROD1 NORDIC ELECTRICIAN ON SITE TO DISCONNECT TRACTION MOTOR -THOROUGH PRE-JOB WITH CREW ON COIL MANAGEMENT AND SECURING COIL TAIL TO REEL -LOTO ON ELECTRICAL SUPPLIES -MONITOR WELL FOR PRESSURE, LOSSES 8/16/2010 00:00 - 02:30 2.50 DRILL N SFAL PROD1 PREPARE POWERPAK UNIT FOR CHANGING OUT TRACTION MOTOR -CONDUCT PRE-JOB SAFETY MEETING -LOTO ELECTRICAL SUPPLY FOR TRACTION MOTOR, PULL MOTOR AND STAGE IT TO SIDE FOR REPLACEMENT MOTOR -CONCURRENT OPS:CLEAN RIG,MONITOR WELL 02:30 - 12:00 9.50 DRILL N SFAL PROD1 WAITING ON NEW TRACTION MOTOR AND PULLER TO ARRIVE ON LOCATION -CONCURRENT OPS:CLEAN RIG,MONITOR WELL,CHANGE OUT HIGH PRESSURE SCREENS. PULL COUPLER OFF TRACTION MOTOR. 12:00 - 12:30 0.50 DRILL N SFAL PROD1 PJSM REGARDING BLIND LIFT. 12:30 - 13:45 1.25 DRILL N SFAL PROD1 HOIST OLD TRACTION MOTOR TO THE GROUND.HOIST NEW TRACTION MOTOR TO THE PIPESHED. Printed 9/20/2010 4:51:15PM North America -ALASKA- BP Page 12 of 13 Operation Summary Report Common Well Name:F-04 'AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date: 8/7/2010 End Date:8/18/2010 X3-00VW8-C(1,270,700.00) Project:Prudhoe Bay Site: PB F Pad Rig Name/No.: NORDIC 1 Spud Date/Time:2/1/1971 12:00:00AM Rig Release: Rig Contractor:NORDIC CALISTA UWI:500292008900 Active Datum:4:04 2/2/1971 00:00 @57.10ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 13:45 - 00:00 10.25 DRILL N SFAL PROD1 PULL COUPLER OFF NEW TRACTION MOTOR. INSTALL NEW SLB COUPLER ON TRACTION MOTOR. 8/17/2010 00:00 - 03:00 3.00 DRILL N SFAL PROD1 ALLOW NEW SLB COUPLER ON TRACTION MOTOR TO COOL AFTER INSTALLATION. STAGE TRACTION MOTOR INTO POWERPAK. CONNECT ELECTRICAL. FUNCTION TEST. 03:00 - 04:00 1.00 DRILL N SFAL PROD1 DISCONNECT COIL CLAMPS FROM HORSE NECK. BRING COIL TO INJECTOR UNIT. BREAK OFF INTERNAL GRAPPLE. CONDUCT COIL MAINTENANCE,CUT 25'. 04:00 - 05:30 1.50 DRILL N SFAL PROD1 CONDUCT PULL TEST. MU CTC,UPPER QUICK CONNECT AND CONDUCT PRESSURE TEST ON COIL TO 4200 PSI CHECK PRESSURE ON WELL. 0 PSI. REMOVE NIGHT CAP,HOLE FULL. -MONITOR WELL-STATIC -1/2 BPH LOSS PREVIOUS 24 HRS 05:30 - 05:45 0.25 DRILL N SFAL PROD1 PJSM ON MAKING UP BHA.MU 3"BI-CENTER BIT TO PREVIOUS DRILLING BHA. 05:45 - 08:00 2.25 DRILL N SEAL PROD1 RIH WITH DRILLING BHA.CIRC 0.3BPM/1200PSI. 08:00 - 08:15 0.25 DRILL N SFAL PROD1 LOG DOWN ACROSS RA TAG FOR TIE-IN FROM 9680FT.MINUS 20FT CORRECTION. 08:15 - 09:30 1.25 DRILL N SFAL PROD1 WIPER TO TD,WITH FULL RATE AFTER 9800FT TO AVOID DISTURBING THE SHOE. 1.5BPM/2535PSI.SET DOWN AT 10460FT. BACKREAM TO 10400FT.PASS THROUGH AT 1 BPM/2000PSI.STOP AT 10500FT.BACKREAM TO 10400FT,1.6BPM/2600PSI-CLEAN.RIH, 1.6BPM/2600PSI.SET DOWN AT 11029FT. WORK TO 11045FT.BACKREAM SECTION. RIH WITH 1 BPM/1700PSI.STOP AT 11111 FT. BACKREAM SECTION,1.75BPM/2950PSI. 09:30 - 17:15 7.75 DRILL P PROD1 DRILL BUILD 90L-90R TF FROM 11200FT USING 8.6PPG POWER-VIS AT 1.78 BPM,3030 PSI,100-150PSI MW,20-45 FT/HR ROP, 2K-3.5K WOB,10.05PG ECD,PVT=324. 17:15 - 19:15 2.00 DRILL P -_ PROD1 WIPER TRIP TO SHOE FROM 11500'AND BACK TO BOTTOM-OK. 19:15 - 21:00 1.75 DRILL P PROD1 DRILL AHEAD TO 11570'. 1.67 BPM.MW=8.6 PPG IN.8.7 PPG OUT.OFF BOTTOM PRESSURE 2970 PSI.ON BOTTOM PRESSURE=3300 PSI.BHA WIPER AT 11570' TO 11470. 1 CONTINUE DRILLING AHEAD TO 11675'-TD. ROP 150-250 FPH. 21:00 - 22:30 1.50 DRILL P PROD1 POH TO 9650'FOR WIPER TRIP.LOW SIDE MOTOR AND BACKREAM ACROSS SHALES. 1.75 BPM IN/OUT.3100 PSI.PULL SPEED 15 FPM ACROSS SHALES.ECD COMING DOWN TO 10.1 PPG AT 11000'.MINOR MOTOR WORK AT 11050'.SLOW PUMP RATE TO 0.5 BPM WHEN PULLING INTO SHOE AT 9766'.TIE IN TO RA PIP AT 9656'.SAW RA PIP AT 9644' CTM.CORR'N+12'. Printed 9/20/2010 4:51:15PM North America -ALASKA- BP Page 13 of 13 Operation Summary Report Common Well Name:F-04 I AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:8/7/2010 End Date: 8/18/2010 X3-00VW8-C(1,270,700.00) Project:Prudhoe Bay Site: PB F Pad Rig Name/No.: NORDIC 1 Spud Date/Time:2/1/1971 12:00:00AM Rig Release: Rig Contractor:NORDIC CALISTA UWI:500292008900 Active Datum:4:04 2/2/1971 00:00 @57.10ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 22:30 - 00:00 1.50 DRILL P PROD1 RIH PUMPING 0.25 BPM PAST SHOE. INCREASE TO 1.5 BPM IN/1.7 BPM OUT IN OPEN HOLE.45 FPM RUN SPEED.2630 PSI PP.RIH TO 11460'-JUST BELOW SHALES. POH TO 11000'TO CLEAN UP AT 20-25 FPM- MOTOR WORK AT 11430'-11380'.RIH. 8/18/2010 00:00 - 00:45 0.75 DRILL P PROD1 RIH TO TD AT 11681'. WORK SHALES AGAIN UP TO 11300'. START DOWNHOLE WITH NEW LINER RUNNING PILL. RIH TO TD.SEEING MOTOR WORK AND TAKING WEIGHT THRU SHALES- SEEMS TO BE ASSOCIATED WITH MOTOR ORIENTATION RELATIVE TO ORIENTATION WHEN DRILLED. TAG TD AT 11681'. 00:45 - 01:45 1.00 DRILL P PROD1 POH FROM TD LAYING IN LINER PILL.0.8 BPM FLOWRATE.33 FPM PULL SPEED.NO OVERPULLS OR MOTOR WORK SEEN-HOLE CONDITION LOOKS GOOD. 01:45 - 02:45 1.00 DRILL P PROD1 LOG OUT WITH BAKER CCL FROM 9000'UP TO 8400'TO LOG ACROSS 3 1/2"LINER TOP. LOGGING SPEED 18 FPM.FLOWRATE 2.25 BPM.FLAG PIPE AT 8350'EOP. 02:45 - 04:30 1.75 DRILL P PROD1 POH FOR 2 3/8"LINER.OPEN EDC AND POH PUMPING 2.5 BPM IN.2.16 BPM OUT.90 FPM PULLING SPEED.FLAG PIPE AT 6450'EOP. CONTINUE POH TO BHA. RIH TO 500'AT 100 FPM PUMPING 2.1 BPM. CLOSE EDC. POH TO BHA.4 BBL LOSS ON TRIP OUT. 04:30 - 05:30 1.00 DRILL P PROD1 STAND BACK INJECTOR.BLOW DOWN BHA. LD BHA COMPONENTS. BIT DULL GRADE: 1-4-CT-G-X-I-BT-PN-TD. Printed 9/20/2010 4:51:14PM North America -ALASKA- BP Page 1 of 5 Operation Summary Report Common Well Name:F-04 AFE No Event Type:COM-ONSHORE(CON) Start Date: 8/14/2010 End Date: 8/19/2010 X3-00VW8-C(1,137,425.00) Project:Prudhoe Bay Site: PB F Pad Rig Name/No.:NORDIC 1 Spud Date/Time:2/1/1971 12:00:00AM Rig Release: gA�/a0/0 Rig Contractor:NORDIC CALISTA UWI:500292008900 �v Active Datum:4:04 2/2/1971 00:00 @57.10ft(above Mean Sea Level) _ Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations hr) ft) 8/18/2010 05:30 - 06:00 0.50 CASING P -_ RUNPRD PUMP SLACK OUT OF E LINE.RECOVER AND CUT 280'OF E LINE 06:00 - 07:00 1.00 CASING P RUNPRD CLEAR FLOOR AND RU TO RUN 2 3/8"LINER 07:00 - 08:00 1.00 CASING P -_ RUNPRD PREP TO DROP 3/4"BALL TO DRIFT COIL. PUMP AND RECOVER 3/4"BALL. 08:00 - 13:30 5.50 CASING P ■- RUNPRD STAND BACK JTS LINER AND 2 DEPLOYMENT SHOE TRACK AND 96 JTS LINER AND DEPLOYMENT TOOLS. 13:30 - 14:15 0.75 CASING P - RUNPRD PU 6 JTS 2 1t/16"CSH.MU COILED TUBING TO CSH WORKSTRING.STAB INJECTOR. 14:15 17:00 2.75 CASING P RUNPRD RIH WITH LINER. 17:00 - 18:15 1.25 CASING P RUNPRD LAND LINER AT 11705'POH TO ESTABLISH BREAKOVERWT AND DEPTH-43 KLBS WITOUT PUMP.DROP BALL AND DISCONNECT FROM LINER. 18:15 - 21:15 3.00 CASING P RUNPRD PULL TO PU WT-28 KLBS WO PUMP. SWITCH TO KCL AND DISPLACE WELL-1.6 BPM @ 3090 PSI @ 52 BBLS AWAY-KCL GOING OUT OF SHOE.STARTING TO SEE LOSS OF-0.1 BPM ONCE KCL STARTED IN ANNULUS.SLOW TO 1.4 BPM @ 2990 PSI IN AND 1.27 BPM OUT. AT 80 BBLS PUMPED,LOSSES AT 0.15 BPM WITH PRESSURE DROPPING TO 2800 PSI. INCREASE RATE TO 1.6 BPM AT 3100 PSI. LOSSES AT 0.1 BPM.AT 110 BBLS AWAY,KCL BACK TO SURFACE AND CIRC PRESSURE DROPPING. 1.5 BPM IN/1.4 BPM OUT @ 2450 _ PSI WITH 156 BBLS PUMPED. 21:15 - 21:35 0.33 CASING P RUNPRD PJSM WITH SLB CEMENT PUMPERS,RIG CREW AND THIRD PARTY CONTRACTORS. DISCUSS MUSTER AREA, PUMP SCHEDULE, GOOD COMMUNICATION AND ROLES AND RESPONSIBILITIES. 21:35 - 22:20 0.75 CASING P RUNPRD PRIME UP CEMENT VAN AND INSTALL HIGHER PRESSURE POP-OFFS FOR 6000PSI PRESSURE TEST. BATCH MIX CEMENT. ESTABLISH CIRCULATING PRESSURE FOR THE FOLLOWING RATES: 0.5 BPM=460 PSI 1.0 BPM=1410 PSI 1.5 BPM=2630 PSI PRESSURE TEST CEMENT TREATING LINE TO 6000 PSI. Printed 9/20/2010 4:56:50PM • North America -ALASKA- BP Page 2 of 5 Operation Summary Report Common Well Name: F-04 1 AFE No Event Type: COM-ONSHORE(CON) Start Date:8/14/2010 End Date:8/19/2010 X3-00VW8-C(1,137,425.00) Project: Prudhoe Bay Site: PB F Pad Rig Name/No.: NORDIC 1 Spud Date/Time:2/1/1971 12:00:00AM Rig Release: Rig Contractor: NORDIC CALISTA UWI: 500292008900 Active Datum:4: 04 2/2/1971 00:00 @57.10ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 22:20 - 00:00 1.67 CASING P RUNPRD PUMP 8 BBL 15.8 PPG CLASS G CEMENT, STAGE: 1 BBL AWAY=1.5 BPM @ 2900 PSI. RETURN MM=1.33 BPM 4 BBL AWAY=1.5 BPM @ 3373 PSI. RETURN MM=1.31 BPM 7.7 BBL AWAY-1.3 BPM @ 3678 PSI. RETURN MM=1.29 BPM 8.0 BBLS. SHUT DOWN PUMP AND ZERO MICRO MOTION. ISOLATE CEMENT TREATING LINE AND LINE UP TO PUMP GM BIOZAN WITH RIG PUMP. HIGH PRESSURE FILTERS ARE ISOLATED. 2 PPB BIOZAN STAGE: 3 BBL AWAY= 1.0 BPM @ 2655 PSI. RETURN MM=0.92 BPM 9 BBL AWAY=1.0 BPM @ 2937 PSI. RETURN MM=0.98 BPM 17 BBL AWAY=1.35 BPM @ 2920 PSI. RETURN MM=1.16 BPM 25 BBL AWAY=1.27 BPM @ 3087 PSI. RETURN MM=1.16 BPM 30 BBL AWAY=0.71 BPM @ 1157 PSI. RETURN MM=0.67 BPM 35 BBL AWAY=0.70 BPM @ 1183 PSI. RETURN MM=0.66 BPM 37.6 BBL AWAY. SHUT DOWN PUMP WITH 2 BBL CEMENT LEFT IN COIL AND PH6. EXHAUST 2 BBLS CEMENT AND 3 BBLS BIOZAN. RATES WHILE EXHAUSTING=0.70 BPM @ 1029 PSI. OPEN BAKER CHOKE AND STING BACK INTO DEPLOYMENT SLEEVE WITH 10K DOWN WEIGHT. SHEAR LWP AT 3000 PSI WITH.4 BBLS AWAY. PUMP LWP WITH 0.97 BPM @ 2421 PSI. 10.8 BBLS AWAY=0.56 BPM @ 2908 PSI. 11.3 BBLS POSSIBLE LWP BUMP(CALCULATED VOLUME TO BUMP=11.9 BBLS) 5.0 BBLS ON RETURN MICRO MOTION= THEORETICAL CEMENT VOLUME BEHIND LINER. PRESSURE BLEEDS OFF. CONTINUE TO TRY TO LAND LWP. PUMP A TOTAL OF 1 BBL BEYOND CALCULATED LINER VOLUME (12.9 BBLS).DID NOT SEE CLEAR INDICATION THAT LWP HAD BUMPED.OPEN BAKER CHOKE AND CHECK FLOATS. 8/19/2010 00:00 - 00:30 0.50 CASING P RUNPRD CIP AT 00:01 HRS.OPEN CHOKE AND CHECK FOR FLOW BACK. NO FLOW OVER 5 MIN- FLOATS APPEAR TO BE HOLDING.UNSTING FROM LINER AND CIRC 10 BBLS BIOZAN INTO ANNULUS TO CONTAMINATE CEMENT. 00:30 - 01:30 1.00 CASING P RUNPRD POH AT 80%.CIRC 2.2 BPM @ 1930 PSI.SAW CEMENT AT SURFACE WHEN AT 5000'.2.55 BPM©1670 PSI.CIRC OUT ALL CEMENT. 01:30 - 02:45 1.25 CASING P RUNPRD CONTINUE POH PUMPING 2.55 BPM. RETURNS CLEAN AT SURFACE. Printed 9/20/2010 4:56:50PM North America -ALASKA - BP Page 3 of 5 Operation Summary Report Common Well Name: F-04 AFE No Event Type:COM-ONSHORE(CON) Start Date: 8/14/2010 End Date: 8/19/2010 X3-00VW8-C(1,137,425.00) Project:Prudhoe Bay Site: PB F Pad Rig Name/No.:NORDIC 1 Spud Date/Time:2/1/1971 12:00:00AM Rig Release: Rig Contractor:NORDIC CALISTA UWI:500292008900 Active Datum:4:04 2/2/1971 00:00©57.10ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 02:45 - 03:45 1.00 CASING P RUNPRD PJSM.LD LINER RUNNING TOOL.SET BACK INJECTOR. 03:45 - 08:30 4.75 EVAL P OTHCMP PJSM.MU CLEAN OUT BHA. 08:30 - 10:15 1.75 EVAL N HMAN 3,000.00 OTHCMP STANDBACK CSH TO SWAP MILL SIZES 10:15 - 14:30 4.25 EVAL N HMAN 3,000.00 OTHCMP SWAP MILL SIZES FROM 1.875"TO 1.75"AND BEGIN MAKING UP CSH 14:30 - 15:40 1.17 EVAL P OTHCMP MU INJECTOR AND RIH WITH CLEANOUT ASSEMBLY AND 1.75"PARABOLIC MILL. 15:40 - 17:15 1.58 EVAL P OTHCMP PUH FOR WT CK. 8500'=27.5K. FREE SPIN AT.3 BPM=326 PSI,FREE SPIN AT 1.0 BPM= 1556 PSI. DRIFT THROUGH BOTH DEPLOYMENT SLEEVES AND INTO 2-3/8" LINER WITH OUT PROBLEM.CONTINUE TO RIH TO PBTD.COMPRESSIVE STRENGTH OF CEMENT=1689 PSI AT 16:00. 17:15 - 19:10 1.92 EVAL P OTHCMP TAG SUSPECTED PBTD AT 11696'MD. POOH CIRCULATING AT 1.0 BPM 19:10 - 22:00 2.83 EVAL P OTHCMP STAND BACK INJECTOR.RACK BACK 52 STDS 1"CSH.LD CLEANOUT BHA. 22:00 - 22:15 0.25 EVAL P OTHCMP PJSM FOR PU MCNL LOGGING TOOL. 22:15 - 23:45 1.50 EVAL P OTHCMP MU MCNL WITH PORTED SUB,DISCONNECT AND DUAL BPV.RIH ON 1"AND 2 1116"CSH WORKSTRING.MU TO COIL CONNECTOR AND STAB INJECTOR ON WELL. 23:45 - 00:00 0.25 EVAL P OTHCMP UNANNOUNCED KICK WHILE TRIPPING DRILL.CREW RESPONSE TIME 48 SEC TO SECURE WELL.AAR AND IDENTIFY NEED TO PU SAFETY JOINT WITH A TUGGER NOT MANUALLY. BRACKET ON THE ODS MAST SCOPING CYLINDER HAS A BRACKET CLAMPED TO IT FOR MOVING.THE BRACKET NEEDS TO BE ROTATED 90 DEG SO DERRICKMAN CAN COME OUT OF THE MAST WITHOUT BANGING IN TO THIS PROTRUSION. 8/20/2010 00:00 - 01:00 1.00 EVAL P OTHCMP RUN MEMORY CNL LOG ON 1"CS HYDRIL WORKSTRING.PU INJECTOR.MU COIL CONNECTOR.STAB ONTO WELL. 01:00 - 02:00 1.00 EVAL P OTHCMP RIH WITH MCNL to 8350'. 02:00 - 04:00 2.00 EVAL P OTHCMP START LOGGING DOWN FROM 8350'-225' ABOVE 2 3/8"LINER TOP.LOGGING SPEED- ■ 30 FPM DOWN.TAG PBTD AT 11695'CTM. 04:00 - 05:00 1.00 EVAL P OTHCMP POH LOGGING OUT AT 60 FPM.LAY IN PERF PILL WHILE POH.FLAG PIPE AT 8200'EOP. LOG OUT TO 8345'. 05:00 - 06:00 1.00 EVAL P OTHCMP POH TO LD BHA 06:00 - 12:00 6.00 EVAL P OTHCMP LD CSH AND LOGGING BHA.RECOVER GOOD DATA 12:00 - 12:30 0.50 PERFOB P OTHCMP PJSM FOR PICKING UP PERFORATING GUNS 12:30 - 16:00 3.50 PERFOB P OTHCMP PU PERFORATING BHA AND STAB ON_WITH INJECTOR. 16:00 - 17:15 1.25 PERFOB P OTHCMP RIH 17:15 - 17:45 0.50 PERFOB P OTHCMP WT CK AT 11600'=34K, TAG BOTTOM AT 11689.3'. PU AND GET WEIGHT BACK AT 11684'. Printed 9/20/2010 4 56:50PM North America -ALASKA- BP Page 4 of 5 • Operation Summary Report Common Well Name: F-04 AFE No Event Type:COM-ONSHORE(CON) Start Date:8/14/2010 End Date: 8/19/2010 X3-00VW8-C(1,137,425.00) Project:Prudhoe Bay Site: PB F Pad Rig Name/No.:NORDIC 1 Spud Date/Time:2/1/1971 12:00:00AM Rig Release: Rig Contractor:NORDIC CALISTA UWI:500292008900 Active Datum:4:04 2/2/1971 00:00 @57.10ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 17:45 - 19:00 1.25 PERFOB P OTHCMP RIG CREW CHANGEOUT AND PREP TCP TO FIRE PERFORATING GUNS.PUT GUNS 2' BELOW FINAL DEPTH FOR PERFORATING. 19:00 - 19:25 0.42 PERFOB P OTHCMP INITIATE FIRING SEQUENCE WITH PUMP. FOLLOW PUMP ON/OFF SEQUENCE AND WAIT FOR GUNS TO FIRE.MOVE GUNS SLOWLY UPHOLE TO FINAL DEPTH PRIOR TO FIRING. HAD GOOD SHOT DETECTION WHEN GUNS FIRED AT 19:25 HRS. PERF INTERVALS: 10680'-11010' Peef 11060'-11200' 11460'-11660' 670'TOTAL PERF INTERVAL. 1.56"6SPF 1606PJ SWS PERFORATING GUNS USED. 19:25 - 21:15 1.83 PERFOB P OTHCMP• PULL UPHOLE WITH GUNS WITHOUT PROBLEMS.POH-HOLE FILL CORRECT.NO APPARENT LOSSES.FLOW CHECK AT 1400' CTM-STATIC.DISCONNECT AND STAND BACK INJECTOR. 21:15 - 23:45 2.50 PERFOB P OTHCMP LD 2 JTS 2 1/16"CSH AND 74 JTS 1"CSH WORKSTRING. 23:45 - 00:00 0.25 PERFOB P OTHCMP-_RU TO LD PERFORATING GUNS. 8/21/2010 00:00 - 00:30 0.50 PERFOB P OTHCMP PJSM FOR LD PERF GUNS. 00:30 - 04:00 3.50 PERFOB P OTHCMP LD 47 PERFORATING GUNS ALL SHOTS FIRED.CLEAR FLOOR AND REMOVE GUNS FROM PIPE SHED. 04:00 - 04:30 0.50 ZONISO P OTHCMP MU 2.24"OD SEAL STINGER,NO-GO LOCATOR,23/8"STL SPACEOUT PUPS LTP TO SET BELOW X NIPPLE IN 4 5"TAILPIPE 04:30 - 06:30 2.00 ZONISO P OTHCMP RIH 06:30 - 08:00 1.50 ZONISO P OTHCMP WT CK AT 8441'=30K. RIH AND NOTED PRESSURE INCREASE AT 8598.4'. CONTINUED IN HOLE AND SET DOWN 8602'. PUH AND GET WEIGHT BACK+1.5'. DROP 5/8"BALL TO SET LTP. LAND BALL AT 26.7 BBLS AWAY. OPEN BAKER CHOKE AND STING SEAL ASSEMBLY INTO DEPLOYMENT SLEEVE. TAG AT 8603'. PUH AND GET WEIGHT BACK+1.1'. PRESSURE UP TO SET PACKER. 08:00 - 09:00 1.00 ZONISO P OTHCMP PRESSURE TEST LTP BY PUMPING DOWN THE BACKSIDE OF COII INITIAL PRESSURE TEST AT 08:07=2336 PSI 15 MINUTE PRESSURE TEST AT 08:22=2322 PSI 30 MINUTE PRESSURE TEST AT 08:37=2314 PSI LTP PRESSURE TEST PASS BLEED DOWN PRESSURE FROM BACKSIDE AND LINE UP TO PUMP DOWN THE COILED TUBING. 09:00 - 10:30 1.50 ZONISO P OTHCMP POOH 10:30 - 11:00 0.50 ZONISO P OTHCMP OOH,BEGIN LAYING DOWN BHA. INSPECT LTP SETTING TOOL. TWO 0-RINGS ON LOWER SEALING ASSEMBLY MISSING. TOOL OTHERWISE APPEARED TO HAVE FUNCTIONED PROPERLY. Printed 9/20/2010 4:56:50PM North America -ALASKA- BP Page 5 of 5 Operation Summary Report Common Well Name:F-04 AFE No Event Type:COM-ONSHORE(CON) Start Date: 8/14/2010 End Date: 8/19/2010 X3-00VW8-C(1,137,425.00) Project:Prudhoe Bay Site:PB F Pad Rig Name/No.:NORDIC 1 Spud Date/Time:2/1/1971 12:00:00AM Rig Release: Rig Contractor:NORDIC CALISTA UWI:500292008900 ActiveDatum:4:04 2/2/1971 00:00 @57.10ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 11:00 - 11:30 0.50 RIGD P POST MU BHA WITH JET SWIRL NOZZLE FOR FREEZE PROTECT OF WELL. 11:30 - 12:00 0.50 RIGD P POST RIH TO 2500'TO FREEZE PROTECT WELL 12:00 - 12:15 0.25 RIGD P POST PJSM WITH LRS AND RIG CREW FOR FREEZE PROTECT OF WELL. DISCUSS WIND DIRECTION,MUSTER AREA,GOOD COMMUNICATION AND ROLES AND RESPONSIBILITIES. 12:15 - 12:40 0.42 RIGD P POST RIG UP AND PRESSURE TEST LRS FOR FREEZE PROTECT OPS. 12:40 - 14:00 1.33 RIGD P POST LAY IN DIESEL FOR FREEZE PROTECT OF WELL FROM 2500' 14:00 - 15:45 1.75 RIGD P POST PICKLE COIL AND PREP FOR REEL BLOWDOWN. 15:45 - 16:30 0.75 RIGD P POST BLOW DOWN REEL WITH 1500 SCF N2 FOR 15 MIN. RELEASE SLB N2 TRUCK. 16:30 - 18:00 1.50 RIGD P POST GREASE ALL TREE VALVES.SET BPV. 18:00 - 18:15 0.25 RIGD P POST PJSM WITH NORDIC,SCHLUMBERGER. 18:15 - 22:00 3.75 RIGD P POST RU GRAPPLE ON CT.UNSTAB COIL FROM INJECTOR AND SECURE TO REEL.REMOVE STUFFING BOX.LOWER REEL ONTO LOWBOY TRAILER AND SECURE SAME. RD FARR TONGS AND SET OUTSIDE. 22:00 - 00:00 2.00 RIGD P POST CIRC HOT WATER WITH SAFE SURF THRU ALL MUD LINES FOR CLEAN UP PRIOR TO MAINTENANCE SHUT DOWN. 8/22/2010 00:00 - 01:00 1.00 BOPSUR P POST HOLD PJSM.OPEN NON HAZARDOUS CSE PERMIT.CLEAN PITS. 01:00 - 12:00 11.00 BOPSUR P POST ND BOPE.REMOVE RAM DOORS ON TOT'S AND INSPECT RAMS AND CAVITIES.BREAK TORQUE ON ALL FLANGES.INSTALL TREE CAP AND FREEZE PROTECT TREE.TEST TREE-OK.RELEASE RIG AT 12:00 HRS. Printed 9/20/2010 4:56 50PM F-04B, Well History (Post Rig Sidetrack) Date Summary 08/22/10 T/I/O=0/0/0 Pressure tested lubricator to 500 psi (low)for 5 min (1735-1740) passed/3500 psi (high)for 5 min (1741-1746) passed. Set 4" CIW H BPV thru stack @ 96" using 3-5'& 1-3'ext. Nordic 1 RDMO. 08/22/10 T/I/O=0/0/0 Tested Swab (barrier)valve to 500 psi for 5 min. (1606- 1611) low/pas-3500 psi for 5 min. (1613- 1618) high/pass;Tested Master(barrier)valve to 500 psi for 5 min. (1622- 1627) low/pass- 3500 psi for 5 min. (1631 - 1636) high/pass; Pressure tested lubricator intially&each break to 500 psi low/pass-3500 psi high/pass; Pulled 4" CIW BPV#149 @ 114" w/1-1'ext.; Set 4" CIW TWC#286 @ 114"w/1-1'ext.;Torqued tree 1-1/4" L7M non-coated stud (flange) bolts to 730 ft/lbs wpump 430026 @ 5250 psi (see log for amount of movement); Pressure tested tree against TWC for 5 min. (1815- 1820) @ 500 psi low/pass-5000 psi for 5 min. (1821 - 1826) high/pass; Pulled CIW TWC#286 @ 114'; Upon completion tested tree cap to 500 psi; Post Nordic 1. 08/28/10 Set 4-1/2:Whiddon @ 8523' SLM/8534' MD Pulled DGLV's from STA#2 @ 6613' SLM/6631' MD& STA#3 @ 3393'SLM/3410' MD. Set LGLV in STA#3, Set OGLV in STA#2. Pulled 4-1/2"Whiddon from 8523' SLM/8534' MD Page 1 of 1 vp bu BAKER HUGHES INTEQ North America - ALASKA - BP Prudhoe Bay PB F Pad F-04_DIMS - Slot 04 500292008900 F-04B Survey: MWD Survey Report - Geographic 19 August, 2010 bp BAKER +4• HUGHES Survey Report-Geographic i bp INTEQ Company: North America-ALASKA-BP Local Co-ordinate Reference: Well F-04 DIMS-Slot 04 Project: Prudhoe Bay TVD Reference: 4:04 2/2/1971 00:00 @ 57.10ft(generic drilling ri Site PB F Pad MD Reference: 4:04 2/2/1971 00:00 @ 57.10ft(generic drilling ri Well: F-04_DIMS North Reference: True Wellbore: F-04B Survey Calculation Method: Minimum Curvature Design: F-04B Database: EDM.16-ANC Prod-WH24P Project Prudhoe Bay,GPB, PRUDHOE BAY Map System: US State Plane 1927(Exact solution) System Datum: Mean Sea Level Geo Datum: NAD 1927(NADCON CONUS) Using Well Reference Point Map Zone: Alaska Zone 04 Using geodetic scale factor Site PB F Pad,TR-11-13 Site Position: Northing: 5,972,527.29ft Latitude: 70°19'55.283 N From: Map Easting: 650,960.70ft Longitude: 148°46'31.468 W Position Uncertainty: 0.00 ft Slot Radius: 0.000 in Grid Convergence: 1.15 ° Well F-04 DIMS API No 500292008900 Well Position +N/-S 0.00 ft Northing: 5,973,827.99 ft Latitude: 70°20'7.875 N +E/-W 0.00 ft Easting: 651,959.92 ft Longitude: 148°46'1.527 W Position Uncertainty 0.00 ft Wellhead Elevation: ft Ground Level: 0.00 ft Wellbore F-04B API No 500292008902 Magnetics Model Name Sample Date Declination Dip Angle Field Strength (°) (°) (nT) BGGM2009 2/17/2010 22.28 80.95 57,683 Design F 04B Audit Notes: Version: Phase: ACTUAL Tie On Depth: 9,600.00 Vertical Section: Depth From(TVD) +N/-S +E/-W Direction (ft) (ft) (ft) (°) 21.60 0.00 0.00 84.87 Survey Program Date: 8/19/2010 From To (ft) (ft) Survey(Wellbore) Tool Name Description 100.00 9,600.00 Gyro(F-04) GYD-GC-MS Gyrodata gyrocompassing m/s 9,645.50 11,681.00 MWD(F-04B) MWD MWD-Standard 8/19/2010 11:12:05AM Page 2 COMPASS 2003.16 Build 71 BAKER ES Survey Report-Geographic �a INTEQ Company: North America-ALASKA-BP Local Co-ordinate Reference: Well F-04_DIMS-Slot 04 Project: Prudhoe Bay TVD Reference: 4:04 2/2/1971 00:00 @ 57.10ft(generic drilling ri Site: PB F Pad MD Reference: 4:04 2/2/1971 00:00 @ 57.10ft(generic drilling ri Well: F-04_DIMS North Reference: True Wellbore: F-04B Survey Calculation Method: Minimum Curvature Design: F-04B Database: EDM.16-ANC Prod-WH24P Survey Measured Vertical Map Map Depth Inclination Azimuth Depth +N/-S +E/_W Northing Easting (ft) (°) (°) (ft) (ft) (ft) (ft) (ft) Latitude Longitude 9,600.00 35.47 98.81 8,310.43 704.18 3,839.05 5,974,609.75 655,783.63 70°20'14.791 N 148°44'9.403 W TIP 9,645.50 34.96 94.41 8,347.61 701.15 3,865.09 5,974,607.26 655,809.73 70°20'14.761 N 148°44'8.642 W KOP 9,666.21 32.58 93.68 8,364.82 700.34 3,876.58 5,974,606.68 655,821.22 70°20'14.753 N 148°44'8.307 W 9,682.37 31.36 92.19 8,378.53 699.90 3,885.12 5,974,606.41 655,829.78 70°20'14.749 N 148°44'8.057 W 9,696.53 29.25 90.79 8,390.75 699.71 3,892.26 5,974,606.37 655,836.92 70°20'14.747 N 148°44'7.849 W 9,713.93 26.97 88.94 8,406.10 699.72 3,900.46 5,974,606.55 655,845.11 70°20'14.747 N 148°44'7.609 W 9,758.90 22.16 97.09 8,447.00 698.86 3,919.09 5,974,606.07 655,863.75 70°20'14.739 N 148°44'7.065 W 9,760.00 22.04 97.35 8,448.02 698.81 3,919.50 5,974,606.02 655,864.17 70°20'14.738 N 148°44'7.053 W INTERMEDIATE CASING 1 9,776.68 20.29 101.70 8,463.57 697.83 3,925.44 5,974,605.16 655,870.12 70°20'14.728 N 148°44'6.880 W 9,807.04 15.91 112.57 8,492.43 695.16 3,934.44 5,974,602.67 655,879.18 70°20'14.702 N 148°44'6.617 W 9,829.64 12.77 124.21 8,514.33 692.56 3,939.37 5,974,600.18 655,884.16 70°20'14.677 N 148°44'6.473 W 9,858.60 11.17 141.15 8,542.67 688.58 3,943.78 5,974,596.28 655,888.64 70°20'14.637 N 148°44'6.344 W 9,896.06 9.07 174.19 8,579.57 682.81 3,946.35 5,974,590.57 655,891.34 70°20'14.581 N 148°44'6.269 W 9,924.66 10.29 198.79 8,607.78 678.15 3,945.76 5,974,585.89 655,890.84 70°20'14.535 N 148°44'6.287 W 9,954.52 10.49 224.50 8,637.16 673.68 3,942.99 5,974,581.37 655,888.16 70°20'14.491 N 148°44'6.367 W 9,984.58 11.00 228.98 8,666.70 669.85 3,938.91 5,974,577.46 655,884.16 70°20'14.453 N 148°44'6.487 W � 10,014.34 14.81 256.67 8,695.73 667.10 3,933.06 5,974,574.60 655,878.37 70°20'14.426 N 148°44'6.658 W 10,044.20 18.73 262.94 8,724.31 665.63 3,924.58 5,974,572.95 655,869.92 70°20'14.412 N 148°44'6.905 W 10,075.88 22.85 277.87 8,753.95 665.85 3,913.43 5,974,572.95 655,858.77 70°20'14.414 N 148°44'7.231 W 10,104.14 25.81 281.87 8,779.70 667.87 3,901.97 5,974,574.73 655,847.27 70°20'14.434 N 148°44'7.566 W 10,134.06 27.49 272.74 8,806.45 669.54 3,888.69 5,974,576.13 655,833.96 70°20'14.450 N 148°44'7.953 W 10,162.84 30.74 264.68 8,831.60 669.17 3,874.73 5,974,575.48 655,820.01 70°20'14.447 N 148°44'8.361 W 10,192.86 33.86 260.06 8,856.97 667.02 3,858.84 5,974,573.01 655,804.17 70°20'14.426 N 148°44'8.825 W 10,222.28 37.53 255.92 8,880.87 663.42 3,842.07 5,974,569.07 655,787.48 70°20'14.390 N 148°44'9.315 W 10,254.20 40.47 252.05 8,905.67 657.86 3,822.78 5,974,563.12 655,768.30 70°20'14.336 N 148°44'9.879 W 10,282.54 43.59 249.15 8,926.72 651.55 3,804.89 5,974,556.45 655,750.55 70°20'14.274 N 148°44'10.401 W 10,312.54 46.87 247.01 8,947.85 643.59 3,785.14 5,974,548.09 655,730.97 70°20'14.196 N 148°44'10.978 W 10,342.58 50.27 244.51 8,967.73 634.33 3,764.62 5,974,538.42 655,710.63 70°20'14.105 N 148°44'11.578 W 10,373.62 54.47 243.56 8,986.67 623.57 3,742.52 5,974,527.21 655,688.76 70°20'13.999 N 148°44'12.223 W 10,403.00 58.95 242.88 9,002.80 612.50 3,720.61 5,974,515.70 655,667.08 70°20'13.890 N 148°44'12.863 W 10,432.30 63.06 242.50 9,017.00 600.74 3,697.84 5,974,503.49 655,644.56 70°20'13.775 N 148°44'13.528 W j 10,462.42 66.54 241.02 9,029.82 587.85 3,673.84 5,974,490.11 655,620.82 70°20'13.648 N 148°44'14.230 W 10,486.50 70.13 240.73 9,038.71 576.96 3,654.29 5,974,478.83 655,601.50 70°20'13.541 N 148°44'14.801 W I 10,516.80 76.53 239.79 9,047.39 562.56 3,629.10 5,974,463.92 655,576.61 70°20'13.400 N 148°44'15.536 W 10,546.06 82.90 240.72 9,052.62 548.29 3,604.12 5,974,449.15 655,551.92 70°20'13.259 N 148°44'16.266 W 10,573.84 87.85 243.88 9,054.86 535.42 3,579.61 5,974,435.79 655,527.69 70°20'13.133 N 148°44'16.982 W 10,604.00 90.06 250.21 9,055.41 523.67 3,551.86 5,974,423.48 655,500.18 70°20'13.017 N 148°44'17.793 W 10,634.14 96.05 252.75 9,053.80 514.11 3,523.34 5,974,413.35 655,471.86 70°20'12.924 N 148°44'18.626 W 10,665.40 96.36 260.37 9,050.42 506.90 3,493.14 5,974,405.52 655,441.81 70°20'12.853 N 148°44'19.508 W 10,697.28 91.23 265.56 9,048.31 503.01 3,461.59 5,974,400.99 655,410.35 70°20'12.815 N 148°44'20.430 W , 10,729.92 90.77 274.46 9,047.74 503.01 3,428.98 5,974,400.34 655,377.76 70°20'12.815 N 148°44'21.382 W 10,759.92 90.34 281.53 9,047.44 507.18 3,399.30 5,974,403.90 655,347.99 70°20'12.856 N 148°44'22.249 W 10,791.04 89.66 288.70 9,047.44 515.29 3,369.27 5,974,411.40 655,317.81 70°20'12.936 N 148°44'23.126 W 10,821.00 89.75 295.90 9,047.60 526.65 3,341.57 5,974,422.20 655,289.89 70°20'13.048 N 148°44'23.935 W 10,851.34 90.98 302.98 9,047.41 541.55 3,315.17 5,974,436.56 655,263.19 70°20'13.194 N 148°44'24.705 W 10,881.04 91.17 306.35 9,046.85 558.44 3,290.75 5,974,452.95 655,238.43 70°20'13.361 N 148°44'25.418 W 10,910.94 89.66 299.59 9,046.63 574.70 3,265.68 5,974,468.70 655,213.04 70°20'13.521 N 148°44'26.150 W 10,940.84 88.19 292.33 9,047.19 587.78 3,238.82 5,974,481.23 655,185.93 70°20'13.649 N 148°44'26.935 W 10,970.98 89.17 285.34 9,047.89 597.50 3,210.32 5,974,490.37 655,157.24 70°20'13.745 N 148°44'27.767 W 11,011.58 90.09 276.37 9,048.15 605.14 3,170.49 5,974,497.20 655,117.26 70°20'13.820 N 148°44'28.930 W 11,035.50 88.96 270.85 9,048.35 606.65 3,146.63 5,974,498.22 655,093.38 70°20'13.835 N 148°44'29.627 W 11,061.14 90.43 265.33 9,048.49 605.79 3,121.01 5,974,496.85 655,067.78 70°20'13.827 N 148°44'30.375 W 8/19/2010 11:12:05AM Page 3 COMPASS 2003.16 Build 71 BAKER f7 HUGHES Survey Report-Geographic bp LNTEQ Company: North America-ALASKA-BP Local Co-ordinate Reference: Well F-04_DIMS-Slot 04 Project: Prudhoe Bay TVD Reference: 4:04 2/2/1971 00:00 @ 57.10ft(generic drilling ri Site: PB F Pad MD Reference: 4:04 2/2/1971 00:00 @ 57.10ft(generic drilling ri Well F-04 DIMS North Reference: True Wellbore: F-04B Survey Calculation Method: Minimum Curvature Design: F-04B Database: EDM.16-ANC Prod-WH24P Survey Measured Vertical Map Map Depth Inclination Azimuth Depth +N/-S +E/-W Northing Easting (ft) (°) (°) (ft) (ft) (ft) (ft) (ft) Latitude Longitude 11,092.48 91.14 258.58 9,048.06 601.41 3,090.00 5,974,491.84 655,036.87 70°20'13.784 N 148°44'31.281 W 11,121.26 92.00 252.55 9,047.27 594.24 3,062.15 5,974,484.11 655,009.18 70°20'13.714 N 148°44'32.094 W 11,151.42 92.30 246.16 9,046.13 583.62 3,033.96 5,974,472.92 654,981.21 70°20'13.609 N 148°44'32.918 W 11,181.14 90.98 239.10 9,045.28 569.97 3,007.60 5,974,458.74 654,955.13 70°20'13.475 N 148°44'33.688 W 11,211.88 90.83 231.23 9,044.80 552.43 2,982.39 5,974,440.69 654,930.28 70°20'13.303 N 148°44'34.424 W 11,244.26 89.02 224.11 9,044.84 530.64 2,958.47 5,974,418.42 654,906.81 70°20'13.088 N 148°44'35.123 W 11,274.50 88.07 217.21 9,045.61 507.72 2,938.78 5,974,395.11 654,887.60 70°20'12.863 N 148°44'35.698 W 11,304.00 89.85 210.10 9,046.14 483.18 2,922.45 5,974,370.25 654,871.76 70°20'12.622 N 148°44'36.176 W 11,334.30 90.83 203.04 9,045.96 456.10 2,908.90 5,974,342.90 654,858.77 70°20'12.356 N 148°44'36.572 W 11,364.40 90.15 203.71 9,045.71 428.47 2,896.96 5,974,315.04 654,847.39 70°20'12.084 N 148°44'36.921 W 11,394.24 90.37 211.37 9,045.57 402.04 2,883.18 5,974,288.33 654,834.15 70°20'11.824 N 148°44'37.324 W 11,424.44 89.02 217.01 9,045.73 377.07 2,866.21 5,974,263.02 654,817.69 70°20'11.578 N 148°44'37.819 W 11,461.50 91.20 225.67 9,045.66 349.27 2,841.76 5,974,234.74 654,793.81 70°20'11.305 N 148°44'38.534 W 11,489.60 90.92 232.53 9,045.14 330.88 2,820.54 5,974,215.93 654,772.96 70°20'11.124 N 148°44'39.154 W 11,520.44 89.85 239.44 9,044.93 313.64 2,794.99 5,974,198.18 654,747.77 70°20'10.955 N 148°44'39.900 W 11,550.22 90.18 245.37 9,044.92 299.86 2,768.61 5,974,183.86 654,721.68 70°20'10.819 N 148°44'40.671 W 11,580.42 90.21 248.63 9,044.82 288.06 2,740.81 5,974,171.50 654,694.13 70°20'10.704 N 148°44'41.483 W 11,610.62 88.22 242.36 9,045.24 275.54 2,713.35 5,974,158.43 654,666.93 70°20'10.581 N 148°44'42.285 W 11,640.30 90.74 236.72 9,045.50 260.50 2,687.78 5,974,142.88 654,641.67 70°20'10.433 N 148°44'43.032 W 11,681.00 90.74 236.72 9,044.98 238.17 2,653.76 5,974,119.86 654,608.11 70°20'10.213 N 148°44'44.025 W TD-2 3/8" 8/19/2010 11:12:05AM Page 4 COMPASS 2003.16 Build 71 . TREE= CNV 'WELLHEAD= MCEVOY SAFE. . NOTES: WELL ANGLE>70°@ 10487' ACTUATOR= BA KER C PJC DRAFT -04B "'4-1/2"CHROME TUBING'** KB.ELEV= 57.1' BF.ELEV= 39.17 -------------- KOP= 3000' ^ ^ Max Angle= 96°@ 10812' 30"CONDUCTOR H 95' Datum MD= 10193' i H 1934'-1946'H13-3/8"13-3/8"BAASCH ROSS CSG PATCH Datum TVD= 8800'SS 13-3/8"CSG,72#,N-80 BTRS,ID= 12.347" I-1 1934' / --I 2000' 1-19-518"X 7"XO,ID=6.276" I9-5/8"CSG,47 4,NT-80S, NSCC,ID=8.681" I-( 2000' x x / —1 2022' I-113-3/8"X 9-5/8"XO,ID=8.681" I 18-5/8"CSG,96.5#,K55 STIRS,ID=17.655" --1 2004' 13-3/8"CSG,68#,K-55,ID=12.415" H 2022' ' ' I 2088' 114-1/2"HES X NIP,ID=3.813" I 4-1/2"TBG,12.6#, 13CR-80 VAMACEXO H 2068' GAS LIFT MANDRELS 13CR-80 VAM TOP ST MD TVD DEV TYPE VLV LATCH PORT DATE 3 3410 3387 23 KBG-2 DOME BK 16 08/28/10 2 6631 5919 39 KBG-2 SO BK 20 08/28/10 1 8418 7338 35 _KBG-2 DMY SBK-2C 0 09/12/08 Minimum ID = 1.780" @ 8573' 2.70" BTT DEPLOYMENT SLEEVE I I 8487' 1-14-1/2"HES X NIP,ID=3.813° C X ( 8508' IH T X 4-1/2"BKR S-3 PKR, ID=3.870" I 8531' H41/2"HES X NIP,ID=3.813" I Z Z I 8534' H4-1/2"BKR KB LW,ID=2.370 I 8539' H2-7/8"X 2-3/8"XO,ID=1.920 I g I 8573' H2.70"BTT DEPLOY SLV, ID=1.780" I IF l 8594' I 41/2"HES XN NIP, ID=3.725" I —1 1 4-112"TBG, 12.6#,13CR-80 VAM TOP, H 8605' I / 'T I 8607' —14-1/2"WLEG,ID=3.958" I .0152 bpf,ID=3.958 1 8642' —17"PBR(40'),ID=? I BEHIND 17"TBG,26#,L-80 U4S,.0383 bpf,ID=6.276" I-{ 8656' _ I 8656' H9-5/8"X 7"LW,ID=?? I CT LNR Z 8664' I—I9-5/8"X 7"SEAL ASSY,ID=?? I I NI 8682' I—17'BOT LNR TOP PKR,ID=? I 9-5/8"CSG,47#,N-80 SIL,ID=8.681" --I 9312' I--4 ■ i 8775' H9-5/8"X 7'TNV LTPw/LNR HGR,ID=? 1 4-1/2"X 7"BKR WHIPSTOCK(07/15/10) 9642' 7"MILLOUT WINDOW (F-04B) 9647'-9655' 7"LNR,29#,N-80 S/L, .0371 bpf,ID=6.184" —1 9655' I •r ESTAMTED TOC SCMT(08/18/06) 9762' 33/iG, X 3,�Z ♦•••►•• 10726' H 2-3/8"MARKER JOINT I PERFORATION SUMMARY ■�•�•••�j�•�•1 ••••-••• •• •• •∎ REF LOG: SWS MEM CNL/GR ON 08/20/10 1• REF ►••••♦♦ ANGLE AT TOPPERF: 94°@ 10680' ►••••*• Note: Refer to Production DB for historical pert data A, sl Ir o 3 . %314 11672' --IPBID I SIZE SPF INTERVAL OpnfSgz DATE 1.56" 6 10680 11010 0 08/20/10 frkcor 1.56" 6 11060-11200 0 08/20/10 ` �h• 1.56" 6 11460-11660 0 08/20/10 IM' 2-3/8"LNR,4.70#,L-80 STL,.0039 bpf,ID=1.992" 11679' •! DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT 06/26/76 ORIGINAL COMPLETION 08/30/10 JLJ/AGR GLV C/O(08/28/10) WELL: F-04B 07/10/87 NI ES RWO s 08/31/10 PJC DRLG DRAFT CORRECTIONS PERMIT No:'2100870 03/03/03 NORDIC 2 CTD SIDETRACK(F-04A) API No: 50-029-20089-02 09/14/08 N4ES RWO SEC 2,T11 N,R13E,2308'FSL&2396'FWL 08/22/10 NORDIC 1 CTD SIDETRACK(F-04B) 08/24/10 PJC DRLG DRAFT CORRECTIONS BP Exploration(Alaska) SITAITE U AELASEA SEAN PARNELL,GOVERNOR ALASKA OIL AND GAS 333 W.7th AVENUE,SUITE 100 CONSERVATION COMMISSION ANCHORAGE,ALASKA 99501-3539 PHONE (907)279-1433 FAX (907)276-7542 John McMullen Engineering Team Leader BP Exploration (Alaska), Inc. P.O. Box 196612 Anchorage, AK 99519-6612 Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, PBU F-04B BP Exploration (Alaska), Inc. Permit No: 210-087 Surface Location: 2308' FSL, 2396' FWL, SEC. 02, T11N, R13E, UM Bottomhole Location: 2710' FSL, 5045' FWL, SEC. 02, T11N, R13E, UM Dear Mr. McMullen: Enclosed is the approved application for permit to re-drill the above referenced development well. This permit to drill does not exempt you from obtaining additional permits or an approval required by law from other governmental agencies and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the Commission reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the Commission specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or a Commission order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. Sincerely, eli Daniel T. Seamount, Jr. Chair DATED this" day of July, 2010. cc: Department of Fish 85 Game, Habitat Section w/o encl. (via e-mail) Department of Environmental Conservation w/o encl. (via e-mail) STATE OF ALASKA . �, ,,. ALASK IL AND GAS CONSERVATION COMMIE 'N RECE1\/ED 6 "''j PERMIT TO DRILL !V 20 AAC 25.005 JUN 2 a 2010 1 a.Type of work: lb.Proposed Well Class: ®Development Oil ❑Service-Winj ❑Single Zone 1 c. Specify if well is proposed for: ❑ Drill ®Redrill ❑Stratigraphic Test ❑Development Gas ❑Service-Supply ❑Multiple Zone kas(� K drates ❑ Re-Entry ❑ Exploratory ❑Service-WAG ❑Service-Disp ggRRtt Wp''1!�Igs 2. Operator Name: 5.Bond: ® Blanket ❑Single Well 11. MA`s nd Number: BP Exploration(Alaska) Inc. Bond No. 6194193 PBU F-04B 3. Address: 6. Proposed Depth: 12.Field/Pool(s): P.O. Box 196612,Anchorage,Alaska 99519-6612 MD 11560' TVD 8993'ss Prudhoe Bay Field/Prudhoe 4a. Location of Well(Governmental Section): 7. Property Designation(Lease Number): Bay Oil Pool Surface: ADL 028280 2308'FSL,2396'FWL, SEC.02,T11N, R13E, UM Top of Productive Horizon: 8. Land Use Permit: 13. Approximate Spud Date: 2986'FSL, 1140'FWL, SEC.01,T11N, R13E, UM September 1,2010 Total Depth: 9.Acres in Property: 14.Distance to Nearest Property: 2710'FSL,5045'FWL, SEC.02,T11N, R13E, UM 2560 10,700' 4b. Location of Well(State Base Plane Coordinates-NAD 27): 10.KB Elevation above MSL: 57.1' feet 15.Distance to Nearest Well Open Surface: x- 651960 y-5973828 Zone- ASP4 GL Elevation above MSL: feet to Same Pool: 500' 16.Deviated Wells: Kickoff Depth: 9700 feet 17.Maximum Anticipated Pressures in psig(see 20 AAC 25.035) Maximum Hole Angle: 90 degrees Downhole: 3200 Surface: 2320 18. Casing Program: Specifications Top-Setting Depth-Bottom Quantity of Cement,c.f.or sacks Hole Casing Weight t Grade 'Coupling Length MD ND MD ND (including stage data) 4-1/8" 3-1/2"x 3-3/16" 9.3#/6.2# , L-80 STL/rcu 1220' 8550' 7390'ss 9770 8396'ss Uncemented 3" 2-3/8" 4.6# L-80 STL 1790' 8510' 7356'ss 11560' 8993'ss,40 sx Class'G' • 19. PRESENT WELL CONDITION SUMMARY(To be completed for Redrill and Re-entry Operations) Total Depth MD(ft): Total Depth TVD(ft): Plugs(measured): Effective Depth MD(ft): Effective Depth ND(ft): Junk(measured): 11206' 9019' None 11157' 9017' None Casing Length Size Cement Volume MD ND Conductor/Structural 96' 30" 96' 96' Surface 2004' 18-5/8" 9200 sx Permafrost 2004' 2004' Intermediate 9312' 13-3/8"x 9-5/8" 2410 sx Class'G'. 1775 sx Permafrost II 9312' 8075' Production 10010' 7" 460 sx Class'G' 10010' 8644' Liner Liner 2710' 2-3/8" 51 sx Class'G' —9700'- 11193' 8392'-9018' Perforation Depth MD(ft): 10540'-11020' Perforation Depth ND(ft): 9029'-9014' 20.Attachments: ❑ Property Plat ® BOP Sketch ®Drilling Program ❑Time vs Depth Plot ❑Shallow Hazard Analysis ❑Diverter Sketch ❑Seabed Report ®Drilling Fluid Program ®20 AAC 25.050 Requirements 21. Verbal Approval: Commission Representative: Date: 22. I hereby certify that the foregoi•• is true and correct. Contact Ron Phillips,564-5913 Printed Name Joh eyr C Title Engineering Team Leader / Prepared By Name/Number: Signature ' Phone 564-4711 Date '2 -1/0 S Terrie Hubble,564 4628/it; Commission Use Only Permit To Drill API Number: Permit :ralate: I See cover letter for Number:l/jJOf? 50-029-20089-02-00 0 other requirements Conditions of Approval: If box is checked,well may not be used to explore for,test,or produce coalbe methane,gas hydrates,or gas contained shales: Er Other: 35v° tx` Sop '"S4 Samples Req'd: ❑ es 10 Mud Log Req'd: ❑Yes 'No ,�(,.-2 s ,�e, An,.- 1-&4• i�s.L C 1HZS Measures: Dyes ❑No Directional Survey Req'd: 'Yes ❑No 7 /7//c APPROVED BY THE COMMISSION Date �� ,COMMISSIONER Form 10-401 Revised 07/2009 This permit is valid for 24 months from the date of approval(20 AAC 25.005(g)) Submit In Duplicate 71.7, 7.7,0 GINA, I� -74, To: Alaska Oil & Gas Conservation Commission b From: Ron Phillips CTD Engineer Date: June 22, 2010 Re: F-04B Permit to Drill request Approval is requested for a permit to drill a CTD sidetrack from well F-04. The original 1971 vintage F-04 reached GOR in 2001. The 2003 CTD Sidetrack F-04A was shut in for integrity in 2006. In 2008 a RWO was performed to cut and pull the production liner and change out the tubing. The proposed plan for F-04B is to sidetrack out of the F-04 7" liner with the Nordic 1 Coiled Tubing Drilling rig on or around Sept. 01, 2010. The existing perforations will be isolated by the pre-rig cement squeeze past the whipstock. The sidetrack, F-04B, will exit the 7" liner drill a 4.25" hole through the Kingak, run a 3-3/16" liner across Kingak and drill a 3" hole to the target in the Ivishak Zone 1A/1B. CTD Sidetrack Summary Pre-Rig Work: (scheduled to begin July 6, 2010) 1. S Dummy GLV's 2. 0 MIT-IA, -OA 3. S Run dummy whipstock drift to top of jet cut 2-3/8" liner @ 9,700'. a. 2-3/8" liner pulled Sept. 11, 2008 4. E Set Baker 4-1/2" x 7" through tubing WS, set LS(+/-30 degs) orientation @ 9,680'. 5. C Mill XN nipple at 8,594' to 3.80". 6. C Squeeze 13 bbls of 15.8 ppg cement past WS at 9,680'. 7. 0 Pressure test Tubing to 1,000 psi for 10 minutes. 8. 0 Test: PPPOT-T. Torqued LDS. 9. 0 PT MV, SV, WV 10. 0 Blind and bleed lines, remove well house, level pad. Rig Work: (scheduled to begin on September 01, 2010) 1. MIRU and test BOPE to 250 psi low and 3500 psi high. 2. Mill 3.8"window at 9,680' and 10' of rathole. 3. Drill Intermediate: 4.125" OH, 90' (12 deg/100 planned) ' 4. Run 4jts 3-3/16" uncemented solid liner to cover up the Kingak, cross over to 3-1/2" liner just Th.iS inside window, leaving TOL at 8,550'. • ?TD 5. Drill Lateral: 3" OH, 1,770' (15 &12 deg/100 planned). • 6. Run 2-3/8" solid liner leaving TOL at 8,510'. ' 7. Pump primary cement leaving TOC at 10,000', 8.3 bbls of 15.8 ppg liner cmt planned. • 8. Cleanout liner to PBTD. 9. MCNL/GR/CCL log. 10. Perforate liner per asset instructions (-600'). 11. Set Liner Top Packer at 8,510'. ' Tes4- 12. Freeze protect well, RDMO Post Rig: 1. Re-install well house and attach production lines. 2. Pull BPV 3. Run GLV's 4. Test separator? (-600' of perfs) Mud Program: • Milling/drilling intermediate hole (Kingak): 10.4 ppg Flo-Pro • Drilling lateral (after running liner across Kingak): 8.6 ppg Geo-Vis Disposal: • All Class II drilling and completion fluids will go to Grind & Inject at DS 4. • All Class II drilling solids will go to Grind & Inject at DS 4. • All Class I wastes will go to Pad 3 for disposal. Hole sizes: 4-1/8 bi-center hole: 9,680' to 9,770' • 3.0" bi-center hole: 9,770'— 11,560' Casing Program: uncemented drilling liner followed by a cemented production liner • 3-1/2", L-80, 9.3#, STL, 8,550' and - 9650' and • 3-3/16", L-80, 6.2#, TCII, 9,650' and - 9,770' and • 2-3/8", L-80, 4.6#, STL, 8,510' and - 11,560' and • 8.3 bbls 15.8 ppg cement will be used for liner cementing. (Assuming 3.0" bit size and TD C� 11,560', with 20% excess in the open hole interval) • TOC planned at 10,000'. • • A liner top packer will be run to isolate the annulus. ' Well Control: • BOP diagram is attached. • Pipe rams, blind rams and the CT pack off will be pressure tested to 250 psi and to 3500 psi. • The annular preventer will be tested to 250 psi and 2500 psi. Directional • See attached directional plan. Maximum planned hole angle is 90 deg from 10,600' to TD. • Magnetic and inclination surveys will be taken every 30 ft. No gyro will be run. • Distance to nearest property— 10,700 ft (North) • Distance to nearest well within pool —500' from F-28A. Anti-Collision • There are no collision issues. . Logging • MWD directional and Gamma Ray logs will be run over all of the open hole section. • Cased hole MCNL/GR/CCL, logs will be run. Hazards • The maximum recorded H2S level on F pad is F-39 C 140 ppm. All H2S SOP's will be followed. • Lost circulation risk is moderate (average). Reservoir Pressure • The reservoir pressure on F-04B is estimated at 3,200 psi at 8,800' TVDSS. (7.0 ppg equivalent) • Max. expected surface pressure with gas (0.10 psi/ft) to surface is 2,320 psi. • Ron Phillips CTD Engineer CC: Well File Sondra Stewman/Terrie Hubble TREE= • CNV WELLHEAD= McEVOY F-04A Si NOTES: "'41/2"CI-ROM E TUBING*** ACTUATOR= BAKER C KB.ELEV= 57.1' BF. ELEV= 39.17' I KOP= 3000' ... Max Angle= 96°@ 10812' 30"CONDUCTOR —I 95 .. 5' Datum MD= 10246' 1--I 1934' H 13-3/8"BAASCH ROSS CSG PATCH I Datum TVD= 8800'SS 113-3/8"CSG,72#,N-80 BTRS,ID=12.347" H 1934' ♦—'1 2000' H9-5/8"X T XO,D=6.276" I 19-5/8"CSG,47#,NSCC, ID=8.681" H 2000' L 2022' H 13-3/8"X 9-5/8"XO,D=8.681" I 18-5/8"CSG,96.5#,K55 BTRS,ID=17.655" —I 2004' X 113-3/8"CSG,68#,K-55,ID=12.415" H 2022' ! '----I 2088' H4-1/2"HES X NP,ID=3.813" I 4-1/2"TBG, 12.6#,13CR-80 VAM ACE XO 2068' 13CR-80 VAM TOP GAS LET MANDRELS ST MD ND DEV TYPE VLV LATCH PORT DATE L 3 3410 3387 23 KGB-2 DOME BEK 16 09/24/08 2 6631 5919 39 KGB-2 SO SBK-2C 20 09/24/08 Minimum ID = 1.995" @ 9700' 1 8418 7338 35 KGB-2 OMY SBK-2C 0 09/12/08 TOP OF 2-3/8" LINER 1 1 I 848T H4-1/2"HESX NIP,D=3.813" I z Z I 8508' H7"X 4-1/2"BKR S-3 PKR D=D=3.870" I ■ v I 8531' H4-1/2"FES X NP,D=3.813" I 1 • I 8594' H4-1/2"I-FS XN NP,ID=3.725" I 4-1/2"TBG, 12.6#, 13C R-80 VAM TOP, 8607' 1 __, " I 8607' H4-1/2"WLEG,D=3.958" I .0152 bpf,ID=3.958 17"TBG,26#,L-80, .0383 bpf,ID=6.276" H 8680' I 2' HT FBR(40'),D=?I I 8687 H7"BOT LNR TOP PKR ID=? 8775' H9-5/8"X 7"TNV LTP w/LNR HGR ID=? I I 9-5/8"CSG,47#,N-80 S/L,ID=8.681" H 9312' I— TOP OF 2-3/8"LNR/ JET CUT(08/28/08) —I 9700' ►•I I i 1411 9762' I-1 ESTIMATED TOP OF CEMENT 4/41 111 SCAT(08/18/06) 11111« 111110 1111i0 ..1..1: I 9909' Hr MARKER Jr /1 `1�1 PERFORATION SUMMARY 11101 v 1••••■ REF LOG: SWS MEM CNL ON 03/01/03 111111■1•••••••. MLLOUT WPDOW (F-04A) 10010'-10016' ANGLE AT TOP PERF: 90°@ 10540' (1•1•1•1•1•1•1••• ••■.••••■4 Note:Refer to Production DB for historical pert data 1110' 441 111 1111. SIZE SPF INTERVAL Opn/Sqz DATE 111 .1•1•4•••■ 1•• ••••• 1-1/2" 4 10540-10610 0 03/02/03 1 •••••■ ►/ ♦4•••• 1-1/2" 4 10700-10850 0 03/02/03 ►11114 4*■11111� 1-1/2" 4 10930-11020 0 03/02/03 ►111111111`�111� 1111111111'' ,11` 11157' PBTD 11111C1�111111111 1111, �•1•11� ,/,/,/,/,1,4/,1; w 17"LNR,29#,N-80 S/L,.0371 bpf,D=6.184" H 10665' 12-3/8"LNR 4.6#,L-80 STL,.0039 bpf,D=1.995" 11193' ! DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT 06/26/76 ORIGINAL COM PLETION 12/15/08 I-W/PJC DRLG DRAFT CORRECTIONS WELL: F 04A 07/10/87 NI ES RWO FERMI'No: 2021000 03/03/03 NORDIC 2 CTD SIDETRACK(F-04A) API No: 50-029-20089-01 09/14/08 N4ES RWO SEC 2,T11 N,R13E,2308'FSL&2396'FWL 09/24/08 JLJ/TLH GLV C/O 11/18/08 I-W/JMD DRLG DRAFT CORRECTIONS BP Exploration(Alaska) TREE CM✓ F'WELLH EAD= McEVOY F-04B SAP COTES: **.4-1/2"CHROMETUBING*** ACTUATOR= BAKER C , KB.ELEV= 57.1' Proposed CTD Sidetrack BF.ELEV= 39.17' - KOP= 3000' X Max Angle= 96°@ 10812' 30"CONDUCTOR H 95' Datum MD= 10246' I I 1934' H13-3/8"BAASCH ROSS CSG PATCH I Datum TVD= 8800'SS 13-3/8"CSG,72#,N-80 BTRS, ID= 12.347" -I 1934' / ( 2000' H9-5/8"X 7"XO, ID=6.276" I 9-5/8"CSG,47#, NSCC,ID=8.681" 2000' 2022' H13-3/8"X 9-5/8"XO, ID=8.681" I 18-5/8"CSG,96.5#, K55 BTRS, ID=17.655"IH 2004' X X 13-3/8"CSG,68#,K-55, ID=12.415" -I 2022' ' ' 1 2088' i-14-1/2"HES X NIP, ID=3.813" I 4-1/2"TBG, 12.6#, 13CR-80 VA ACE XO -I 2068' GAS LIFT MANDRELS 13CR-80 VAM TOP ST MD TVD DEV TYPE VLV LATCH PORT DATE I 3 3410 3387 23 KGB-2 DOME BEK 16 09/24/08 L 2 6631 5919 39 KGB-2 SO SBK-2C 20 09/24/08 Minimum ID = 1.995" 97UU� 1 8418 7338 35 KGB-2_ DMY SBK-2C 0 _09/12/08 TOP OF 2-3/8" LINER 1 I - 8487' I--J4-1/2"HES X NIP, ID=3.813" I C 8508' H7"X 4-1/2"BKR S-3 PKR, ID=ID=3.870" I 4-1/2"BKR KB LTP, ID=1.375" -I 8500' I TOL 2-3/8" -1 8510' I 1 1 -I 8531' 1-14-1/2"HES X NIP, ID=3.813" TOL 3-3/16" --I 8550' 8594' 1-14-1/2"HES XN NIP, ID milled to =3.81.; I ■ 4-1/2"TBG, 12.6#, 13CR-80 VAM TOP, -I 8607' ' ° I 8607' 1-14-1/2"WLEG, ID=3.958" I .0152 bpf, ID=3.958 I 8642' I-17"PBR(40'), ID=?I . 7"TBG,26#,L-80, .0383 bpf, ID=6.276" I� 8680' I f I 8682' 1-17"BOT LNR TOP PKR, ID=? I • { 8775' H 9-5/8"X 7"TM/LTP w/LNR HGR, ID=? I 1 I 9-5/8"CSG,47#,N-80 S/L, ID=8.681" -1 9312' I ■ 3-1/2"XO to 3-3/16" IH 9650' 4-1/2"x 7"whipstock -1 9680' 3-3/16"LNR,6.2#, L-80 TC-II, ID=2.786" H 9770' ) 10000' H PLANNED TOC 2-3/8"LINE E I TOP OF 2-3/8"LNR/ JET CUT(08/28/08) --I 9700' I 2-3/8"LNR,4.6#,L-80 STL, .0039 bpf, ID= 1.995' I-I 11560' I PERFORATION SUMMARY REF LOG: SWS MEM CNL ON 03/01/03 ANGLE AT TOP PERF: 90°@ 10540' , Note: Refer to Production DB for historical perf data SIZE SPF INTERVAL Opn/Sqz DATE 1�1�1� �1�.1 97 I /06) 1-1/2" 4 10540- 10610 0 03/02/03 11111∎ 11111 TSGR 9766' 1-1/2" 4 10700- 10850 O 03/02/03 i.........14: ►11111�1��� MILLOUT WINDOW F 04A 10010'- 10016' 1-1/2" 4 10930- 11020 O 03/02/03 ( )1i 111,.. . Ce 111111 . 111111111 _ 11111111111111114, 111111111111111 _ .1.1.1.1.1.1.1.1.E 7"LNR,29#, N-80 S/L, .0371 bpf, ID=6.184" 10665' 11 2-3/8"LNR,4.6#, L-80 STL, .0039 bpf, ID=1.995" -1 11193' • DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT 06/26/76 ORIGINAL COM PLETION 12/15/08 HW/PJC-DRLG DRAFT CORRECTIONS WELL: F-04 07/10/87 141 ES RWO 03/18/10 MSE PROPOSED CTD SIDETRACK PERMIT No: 0 03/03/03 NORDIC 2 CTD SIDETRACK(F-04A) API No: 50-029-20089-0 09/14/08 N4ES RWO SEC 2,T11 N, R13E,2308'FSL&2396'FWL 09/24/08 JLJ/TLH GLV C/O 11/18/08 HW/JMD DRLG DRAFT CORRECTIONS BP Exploration(Alaska) All Measurements are from top of Riser 6/22/2010 i 0 CC F-04B top of bag r BAG bttm of bag I middle of blind/shears Blind/Shears i............ I 1 TOTs middle of pipe/slips 2" combi pipe/slips I. middle of flow cross Mud Cross Mud Cross I I �. middle of rams 2 3/8" x 3-1/2" VBRs I I TOTs • middle I 2" combi pipe/slips iddle of pipe/slips I.. 1 I / 1 Swab Valve Flow Tee • MI W_ Ewe `Mo ell F w z t 0 a) oc CO •- _ ca a co Q CJ J w Q ~ Z co cn .0 w L .0 CD 0) E = Q CO O co CV C L N aCO 4" o R 0. - O � � a y a)wt s d , C1 'L7 ID 0 O. ? mo cc a co CU Q Z a d l., G. a CO o • ® W - �WO Z � Ln CO �i�C '- CO co o N- (N 0 cj,m Li) 'O ONO V to W r SO O M _ O z c LO M ,- O 6 O a) O) - co m `- V p °O 0) n C 0) u) u4) c a 0 o U O O C U 0 o O 7 CO 2 O O N •n J O 0 J N .. , . V O N E O N>OO 0 > ?z'^`�`'�" 0) N O N (n> O) N -J C O• a) E c O7 m a a) .a -0 ? t`l 2 ❑ 0) •- C o N d 3 O '4'• V c 3 . K z :... a) 00 a) s co lg. .r a) J J C9 t U `• ce C C a) o ci • ca; 0m E U) S C C U._ co d O O. `f .r0, CS 0 O LL t Ua) wCLT2 E vx : ° 0 0 O V ?o r L N N O O ! CO ) ° 00 CD o/Y rI J F- E Z U) o N N CO N VV 10 O) 01 N to in W Q N O r-- )r) O) O) of Q?O 1_ •C Q) CO N 1.0 W '�e Z O �_ d (V - h UI) O) s CD a _O. L t 70 7 z Ct w 0 W o cn O Y 3 a) co ~ + O N 03 7 N N = C 0) O .0 N o co N r y o 's C _c O (a 2 W (7) r u) m C o z0 W .0 V co a) Z o (0 z + " r a La- a ❑ o w o 1- O N Z CO N.O C g °) _ o C u) F n. a co o 0)in a E .-. _c LIZ M u) = ui v ti c) m L 0 t Z L Ly >, N-Z V o o °o m O aai CO u) CO m(3 H O o 0 0 0 �O O o a U — o o ti d N 0 ❑ v CO o CO E a - C a 0 LZ i N O - N a)z C7 as m a n c m o 1 0 2 C! m 0 m V d O N N LZ 0- LL ' Cr_ - m 4. CO n 0 m°) a) 3 y o E a) ,3 LL cn Y 2 E t -O LL - C C 0 Z a >, + L+ A o (0 9 c c Z ca. Z d d L.L d d .a 'LC I�, C m co •ari c 0 • 0 c o c d tNv E ci .- to o T ` N _ O Q O O C v• N o N d O a O C O) 2 CO 0 o 0 y .. 01 a) E C O a) N u) O a O a y y E 'y _ _ F. _ 01 N r o v O. in 3 3 o a` in a a° 3 3 a° 3 o a' > > a V• al N _ 0 t0 0 0 0 0 0 0 v a) o co r� W i o co O O o o c_ o o v v o 0 ,ilegZ, o) o v o 0 0 0 0 0 0 Sri o cv . � c 0 0 0 0 co o ca o v o m m Dcr $ A^ c0 ga w U LL v M E, F O Z c N co O t` W co 4 O co 0 0 to V a0 co co co (O N M a0 V co co CO V to co Q O c0 h 0 r— O O r� V M O r` 0- co V co co 0 O N N N 0 r` In N V 0 0 0 0 0 O O O O co co o 0 O �` ( $ M M M M M V 71 V 7 V V V M 0 V a) I 0 rn ;CD C 0 °O J U) N @ .— U) J 0 7 0 0 a 0 0 0 0 0 0 0 0 0 0 0 O M O .— 0 .N- t` a, c a) a) La a � 4 N E O ° CO N 7 N 0O O O TD co 7 C a 0 0 24 I` .2 W pj tO co O V V 0 CO I M 0 CO o "O co to h CO aO 0 co N. N CO N N C O N 0 O V N CO M V N t0 M c0 7 a) L 0 W aNO aco co a°OO co°O a00 a) 0 0 0 a°o aa0 w a) C a, tO t0 In to to to tf) tO tO tO t0 t0 a) r to to to to to to tO tO U7 to to to Lo C 0 CO CO CO a) CO 0 co a, co 0 co a,co o O ) W co a°)) '� d E 13 C U y 7 a) y C i V C 0 0 V O a, a0 co 0 V V to N. 0 O i d w 10 7) to r` N. co co CO 0 co N N. co N. N. O w y 0 0 d co to N O V M N O 0 to a) N tO t L) ca �t.- Ce >. N co a) 0 0 0 0 0 0 0 co co CO CO V M 0 IX °) s m a C co co co to to t0 LC) a) to tr) t0 t0 to O ra re 0 r II E r ^ v v v v v v v v v v v v v (1) O > 0 o CZ 0 1° r N. N. N. N. N. N. N. N. N. N. n N. N.@ a) a) 0 a, 0 a) a) a) a, a, a) 0 0 a J F- 2 Z U) 0 C T c Z tri tri tt) tri co- tt) to tO' U) LU to to' tri W O 0«° (0 O 0 V co co c0 co a0 co c0 V CO Z c O o o CO 0 0 r a0 r` 00 N O r N CO an n v tri ai r� ai r- 0i m o ao W 0 CO • co a) N M v to LO a) m co t0 N CD �-Y,r co 0o 0o rn 0 a) 0 a, a) a) a) 0 0 v M M M M M M M M M M M M M 0 i I W 2 Z L cn W c O O a0 r N 01 CO CO 0 If) CV 00 Ae 00 U) 'a N O M N O O O O LO V 0) M M 03 = °) 2 0 CO V N. to tO C) N. N. M V cc; a)M 0 0 0 W M co 0 a0 N. LO LO co N CT W = R U M 0 co co CO co co CO CD CD CD CO CO W L. Z 0 N 0- CO ca I 1- 0 2 V CO co O 0 to N CO N M O V 0 co O M N M 0 a (Na, ca 7 tO 7 M O 0 n N ao 0 M 0 N tO 00 M .- CO (0 N M CO CO 7 'O V V to O CO N- N COa0 a0 a0 a0 a0 CU ao ao W a0 ao 00 0O > .. F Co— O V to co N o N. O 0 co O o rL O O O O O co co O co 0) co N co G a. - N 03 m C Q r O 0 0 a° Q o T LL M Cl) N O N CO c ) >' ca N 0 a0 CO 0O N aO a0 CO V aO CO a0 0 to Q N 0 c tO V CO co N J aO co co co N. co 0 CO 0 M a) o o M co M 0 N O N cei —1 0 N N. CO O tO N. 0 N U >. m C° ° ° O r r r r r r O 0 6 6 O o O O O CD m O ^+ CO to C ... O ` O a, a ~ °) d n. d E 0.O N N 0. o -? C co m0 ° N CO CO a) d Z IL O D 0_ u_ O _ O O O O O 0 00 NO 0 O o 0 O 0 0 O O /1 y 0 0 0 o o n o o O o 0 o O O Li■ a ° O o 0 o wo wo w o o 0 0 o tri o o u) «') 0 O O o 0 0 O M 0 O O 0 O N O 0 3 co CO d N. ,O N. a N. ,a a0 o co 0 O 0 — cV C f— O .v' 0 0 0 a 0 O 0 C 0 C 0 C 0 0 0 0 O 6 O O 0_ CO U O ti C 2 H Y W W W to r CO o) o p °, N N N Z co C N 0O.. U) 33o rn a v • UN O 0 0 0 0 0 CO (O 0 N. u) U) 0 M 0 V I. W C 0 .) 0 0 0 0 0 C D CO 0 O C O C.L. _.. U 0 0 0 0 0 0 m o 0 0 0 0 0 o O O o Ci O r- r- r; 0 0 0 0 0 0� c co rn C D a o O co c o c o CD ao O co 9 9 9 9 m as Ili= W LL � M F ~ 0 O N O) (./) ¢o O CO N co CO co h V O O 0 N- O N O N- CO V 0 O O U M U) CO O 0 N n N CO V r O O O c0 0 M M m O 6 CO r 6 W 6 O O N N O N M V U) O N CO 0 O U O (N co O M b O N N U CO V co co O co N CO co co N M N- 0 O M M M M CO CC N- O 0 © M N= ■ C) M M M M C) c M M M M M M M M N N (- N N ( a) O » >> O N c_ p _0 7 Cn ▪ N 6 CO .- U) J 0)) 7 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 U M U) U U U U U N N N N N N N N N N N N N N N O▪ Cn N 7 N 0)c d el a) p G E..• N cc) O cO O V M CC7 N V M 0 O O N 0 O CO to O .a U) v- (O 0 CO CO v- M v- U) CO v- M O O M CO N CO C o O O V 6 N N V O O V D h O O M N M U) N O m t O O O N M N N O M CO O co V co V co V V U O O) co CO N- N- CO U) U) V M CO N v- v- 0 0 O CO CO N- CO CO d C U U U U U U O U U U U U U U U V V V V V® ( U) U) to o U) o ) u) u) to to u) u) u) u) ) to O u) u) u)o a" M CO co CO CO CO co CO CO co co co CO CO CO O O O CO O O c Co C m V CO W is C U m m 3 C f" 0 O M U N CO N CO V r O U U M M O V O 0 O M Q a) a CO N CO O O N v- CO M r` CO N N M M CO I M CO O CO N O w m N a o N V C O N O co N- ` O CA O N O O O O r- M O V V t c..) '- re T 0 0) co co N N 0 0 CO O V N _ O CO O O M U CO 0 Z N .0 C U) U) U) U7 U) U) U) V V V V V V CO M CO M M M M N CL TS C C ill t N p ' O r r r O m O m O n O O m m O O m CO O CO m CO CO O CO m N 0) CD 0 CO 0 > 00 = 0 r " Ui U U U U i Cfi Ui u) U U U U U U U u U U U U W Z 1— 'C _ Z c CO t` V U) V M V O V O r- 0 N N CO CO N N- N. M V O V N- co co CO M U) M .— CO V O M CO V U7 r CO ✓ O CO CO O CO r` O N O O O O (N V N V Uo O U) a 0 V O N- CO N- N- _ 00 O 0) CO 0 CO M O CO I- CI) rg O Cr) CO h O U) U) V V M N N ,- 0 0 CO CO CO N- n O g. M M M M M M M M M M M M M cri M N N N N N N I Z Cn L . D) O O U) V 0) V CO N O N V CO V N N CD 0 CO h O � � V O CO O ON- U) r N- CO CO •Zr N O CO 'Cr N CO I- ca p N O M CD (N N N O CC) N CO O N- O O - O O CO N N a)00 0 m = (NO OD CV O COO COO U) U) V V V V V V V V 07 co N N= a Y Z CC CO CO in M O U) O C_0 N CO h N V M M N- CO N 0 N 0 V 7 N 0 N O N v- CO 0 N N CO CO N- V N v- O M v- Cb O O N M M V V V M M M M M M O O co V N. O O O O O O O CO O O O O O O O O (I) N- 00 CD O O CO O O CO O O CO O O co O O comma) 0 ao ao ao ao Co cc ao cc; co. ao ao aO ao co- Co oci aD co co- cc ao N N N N N N O O v- V V N O 0 M 0 M 0 0 0 0 (O 0 CO CO CO <C U) U) 0 V V 0 CO O V N (O 0 0 0 CC . (O O CO M CO CO U) M a0 O O O M M U N W O V CO (O O O O O CO O U) I V CV CV CV CO CA (O N- CV CO V M N N N N N N N N N N N N N N N N N N N N N CO M CO Cb CO c0 0 0 N V V CO O M U) U) U) U) U) 'Cr M N Q M O CO CO CO V V V V V V V CO O O U) O CO O O O O O O O O O O 0 0 O O O O CO N M V CO r CO CO CO CO CO CO CO CO O O CO O O O CO O CO• >, V ▪ to O m O c o E a) m LL Q O CL N N O ? CO O CO CO Z Z 0 O 0 0 0 0 CO O 0 U) 0 0 U O O U) 0 u) 0 0 0 0 ¢ a O O 0 0 0 V a) - O O O O O O V O O O O V O O O O V O O O V O 0 0 0 0 O O O O N _ d A O O O O co O N M V U U 0 0 N- 0 0 0 O CO O 0 0 0 0 ^� O O O O O O O O O O N O O O C O O N N O 0 0 O M V U CO O •. y ^ 0 co Q d V . d O) c E ,O d = .y .i O 0 a v NI N n. co Egg c n v v CO 4Z LA -° v v �COn Lo Lo v `<-• m E• °- N v v v o za-o v Op v v •v o v o co co eo 4 cv in w z Z Z Z Z Z 0O a N to r O co V O o m O V co co N CO ✓ O N C 'O r r O _ 0 z Cn w 0▪ > m • re N N N N N N U C) D m m N MO b O b b b O ▪ m .c5) ca jN LL C V E — ca O a) •- 2 o co co co O O O O O co O O O O Z (V „ ` ,C 0 O O O O O O O O O co co co O O • g 4 i w o 0 0 o in tri in o ti dci o o tr o V V V co C0 co _ CO N V V O 0)N 00 CO CO to to to CO 00 00 to O N U) CO '4) to to u) u) v v v to in v v v v _ In in in u) u) to U) in to in to to to in o N- co CO CO CO CO O CO CD O (0 CO CO CO CD co t LN d N re 1 o C y ° O O O o 0 O O O O O O O O O (.) 03 O O O o o O ° 0 0 0 O O O O - 0• 0 C O_ O o O O In to to O to to to O O( (O CO CO 0) M M ,- In Co CO CO O) N- 6. i R N iii _ I leg_ 0) a CO S=0 v- m W c M Z c ( 00 r.n a) N o) 0 Cn o O CL to co 0 0 U a) o o) o a) c fC ,- I J a)) c � iLi m O M Cd Or LL Cn N 7 N 0 N co O 7 c 0 2vF- W 0 hi U ii c O _ w a) CD E CC a) 41 0 N N CO co c CO) a) c O O^ ti_O c` c CU V = m ... 0 w co a) <j d "C U N w a' T cly To• 0 Q t m c0 co CO CD CD p o 7 is �- co Cn 1[') `- /'Y J Z f/1 O C N cO 0) M W M F 'c V ta co Z p) -1 CD CD a o o 0 t Q o o O O 0 • Z ._ a) CL m CL o 5. L. a°1i 0 0) CO C1 L c 0 0 CD N LO -0 Y a, m o) F- ( C0 = E o 0 0 > m CO E a 0 c c c o . N M V U) 0 p- Y C) F Y W W W c0 I ao rn I- 0. O. CO o m E co O V CO CD CO CO CO CO M CO . N O M Q Z CO CO CA f,- CO CO N L- V O LO .- O CO CO t` R LC 6) F 6 co M V' CD (Ni_ m N 6) ^ CO CO 6) N CO LO U) CO N M 0) M V I IOD Co CO 6) CO 61 61 6) 0) CO LO V- N O Cr) CO W M M M M M M M M M M M Ch M M N N + O o 0 ,- co n M cn U) co m V 6) co ,- co r To V N O M O O M O CO .- V O CO o m CO V r Cn M M a0 N- N- M 6) 6) O N Co- - OD (O o (0 CA 0) 0) CO CO OD CO LO N N 0 CO 0) CID 0 M Co z J CO co co co CO CO CD CO CO CD CD U7 11) V V V U) CO C Z CM 6) C+) a CO N 1- N V 6) V CO QQ COj = CCOO L- V m V CO M 0 CC) N CO 0) M N CO 0 CD a S co. O co. C") 0 7 61 co O co N V CO N O CO CO N O N- g d0 o _ 0) U) a) �_ o � � o � � MM Q .- ol- CA M m It o M O O 61 m 6) 61 61 67 N co co M V' V R CD h r- co O co 6) 6) CA ��pp CL) 0 cc M W CO M W c0 CO CIO W cc aD co' W CO cD U a m 0 0 0 0 D• co m 0 -O O O O O E @ ti d = N N o r- I -O 0 0 0 0 0 0 0 0 0 0 ill in In in U) O Q O 3 a^ O M O O 0 0 0 0 0 0 0 O 0 O V v v V •V 0 csi.t O CL V c c y D$ N O N O 7 -• COn W O 1 60) M co Cn Co a) 0) F- r O CD co O o 2 m O co N _ O Sv' co CO F- 1` ti co co O Lo F- 0) .- N U7 A Z ti CL L.L d d CO y 0 61 61 m 6) 61 6) a1 o O O O 0 0 — — r ( ' Co O T LO �■ o r CO N T .11_; O O 6 d c 0 o C c Y o .. .a a) c E : w ` ; n U an3o U Q cIa a s U o N a v h • s Q= a $ o g M w 8 _ a o - - 8 ,, F , o yv .. ..., p�� 8 4 r. ,, galMal- ' •Mirall1� R �- s 1 m $ 8 3 m - . 12111 s •• 8. "Ii § d o p N m N . / L s it • O N s LL�� - s - LL H mp o m o i� — w ..F 8 8 R 8 . .o. 8 R a 8 R o R 8 R s o a (u►/u OSI)(+)q{11oAU(-)4unos 0 N F 1 O N 0 4 n U �5 88 , a) ffiV F V) ,- 5 tea' O0 8 U -W W W °� V� � 'F . O. CDO N 3 P O H n' ^ffiry^eQR3S3%o "`A ,..e 3 F _ o #sss°os000ssss oa hi aN 3�$�5��$�°�°<o R�o3 3 4 Cl. 22!-, N a 8 gg 4 q 3 owl �SRMarOscNN�NSSgN�° Y g 00053253o mooadB n "E $oo o V, 0N 2,_ 0 cDaD oD O O $ ID p .A s o g pI n N .N N W.9 g g m 288s s s 8s s C< s ± _ q it , h I gt g goo ° ooi 00 i c. b I' n .. U c m ti ° .0 �won vn.-mm n n (u?/13 cg)gldaU pop.ian ani1, • to Al ■2 ,we OO e ss �� . . . . . y \ . . . . . , . / Z 0 c8 ` 2 7 , $ . > -, 0 % g $ w :2 ƒ f n4 . 40£ \ |/ I < ��' � 2;[,-,-; . $ Q Z S0 a a86sA ! #E§`/ .« # x r , 7 Z8 k!&2I ,I: . , %�� $ k' 3 22.8 , --- o kk.l� 1'0 2.11 W � &� p� .\\ ) 0 p ���_ • XI K 7 00. : :: i0 I. f 0 a \ 7( 7 ' -/ k )k r ? ) -) §Ill t 2 ) K .... $ 12 d \/§ / /F , 2 / |J .§ k's--(0 3 d � . . $ A ]§ j. 1 a !!ƒg n 2222» . § J! ~ % i K 44 \ / iii L. �5 § ƒ cal. :n k_ . . . . . ID ~ & § m ) m m B k } & ! » - § & ; : R. k .F. { § S ° 9 f ƒ ) (A 09)()1111oN/@»mS A __ a■ooa IRA ma i ga 140 plwq0.18p2Az!! 41 ?'7'77444'7'7 777'Y m= a 1888888888888888 W .1; V°3288.28888°122M8E _ q�� 8aeoesssss°see8o m I _. ai ry n "" of 2 i (0c�� x'b'H^n O1 °i� °"�O1 O m iii � §isigmgq��iiqqiqqqqqgqgqqqic2s :#='qqq lggqq3iqqqqqqqqiliiiiiliiii33! 8 3 .§§mi8�ee8�mu w X88 !!$!!e!$!!$leee!!e e!!+!!e!!ee!!!eii!e!!*l!*$$ !�e!!!!!!!!!!!!e!!!!i! z e. .- w s ama,3$a°v xm-�m.. .,fir � 0 Va- au � 8°I E°o°o i i 1 ,gym 8.. ° $ GgS 2 800 Gvanihn S} E :0=j Am Mgw am o i r iltii _ � R R8888888ga88 8 ��� �8 f e t ,��-�-1 OO � 0 ' ' '% - 0,.,„,.-•,...,, ........ r I I:1‘114111,,_••.,,_`••■■,...-''.'`' ' \ c ILI g i 11111140 0_ 6 me„(sg - . Ilk NV 1 gym �j \ U M 111111117 ❑ ma c:6:-.11 0111151 i Q m � O V ' T O '40 V m V O n N n W m 8 O 9 N T } g' f/J 8. 4 ROO U \ \\ � � jai 0.. 4!!!PARin -- -____ litgi 1- 0 -- -___.--7--_.--":"."-------: - _I ---------- j N t S Ink BAKER HUGHES INTEQ North America - ALASKA - BP Prudhoe Bay PB F Pad F-04 Plan 2, F-04B Plan 2 Travelling Cylinder Report 02 April, 2010 0 p BA ER MI BPPASSPORT 0 b HUGS Travelling Cylinder Report p 1NTEQ Company: North America-ALASKA-BP Local Co-ordinate Reference: Well F-04-Slot 04 Project: Prudhoe Bay TVD Reference: 4:04 2/2/1971 00:00 @ 57.10ft(generic drilling rig) Reference Site: PB F Pad MD Reference: 4:04 2/2/1971 00:00 @ 57.10ft(generic drilling rig) Site Error: 0.00ft North Reference: True Reference Well: F-04 Survey Calculation Method: Minimum Curvature Well Error: 0.00ft Output errors are at 1.00 sigma Reference Wellbore Plan 2,F-04B Database: EDM.16-Anc Prod-WH24P Reference Design: Plan 2 Offset TVD Reference: Offset Datum Reference Plan 2 Filter type: GLOBAL FILTER APPLIED:All wellpaths within 200'+100/1000 of refer( Interpolation Method: MD Interval 25.00ft Error Model: ISCWSA Depth Range: 9,650.00 to 11,560.00ft Scan Method: Tray.Cylinder North Results Limited by: Maximum center-center distance of 1,353.84ft Error Surface: Elliptical Conic Survey Tool Program Date 4/2/2010 From To (ft) (ft) Survey(Wellbore) Tool Name Description 100.00 9,650.00 Gyro(F-04) GYD-GC-MS Gyrodata gyrocompassing m/s 9,650.00 11,560.00 Plan 2(Plan 2,F-04B) MWD MWD-Standard Casing Points Measured Vertical Casing Hole Depth Depth Diameter Diameter (ft) (ft) Name (in) (in) 2,022.00 2,021.52 13 3/8" 13.375 17.500 9,312.00 8,075.07 9 5/8" 9.625 12.250 2,004.00 2,003.52 18 5/8" 18.625 26.000 9,770.00 8,452.91 3-3/16" 3.188 4.125 Summary Reference Offset Centre to No-Go Allowable Measured Measured Centre Distance Deviation Warning Site Name Depth Depth Distance (ft) from Plan Offset Well-Wellbore-Design (ft) (ft) (ft) (ft) PB F Pad F-03-F-03-F-03 Out of range F-03-F-03A-F-03A Out of range F-04-F-04-F-04 9,675.00 9,675.00 0.00 4.81 -4.64 FAIL-Major Risk F-04-F-04A-F-04A 9,675.00 9,675.00 0.00 5.08 -4.91 FAIL-Major Risk F-04-F-04APB1 -F-04APB1 9,675.00 9,675.00 0.00 5.08 -4.91 FAIL-Major Risk F-05-F-05-F-05 Out of range F-05-F-05A-F-05A Out of range F-05-F-05A-Plan#3 Out of range F-10-F-10A-F-10A Out of range F-23-F-23-F-23 9,667.83 9,500.00 445.42 192.61 299.43 Pass-Major Risk F-23A-F-23A-F-23A 9,667.83 9,500.00 445.42 192.61 299.43 Pass-Major Risk F-27-F-27-F-27 9,650.00 9,750.00 1,232.70 184.20 1,054.64 Pass-Major Risk F-27-F-27A-F-27A 10,050.00 12,275.00 1,110.41 201.69 997.10 Pass-Major Risk F-28-F-28A-F-28A 11,555.78 10,425.00 680.95 268.97 418.69 Pass-Major Risk F-28-F-28A-Plan#2x Out of range F-47-F-47-F-47 11,212.36 10,125.00 957.66 194.43 763.47 Pass-Major Risk F-47-F-47A-F-47A 11,212.36 10,125.00 957.66 194.43 763.47 Pass-Major Risk CC-Min centre to center distance or covergent point,SF-min separation factor,ES-min ellipse separation 4/2/2010 10:08:09AM Page 2 of 17 COMPASS 2003.16 Build 71 Alaska Department of Natural Resources Land Administration System Page 1 ori/ ;Alaska Mapper Land Records/Status Plats Recorder's Search State Cabins Natural Resources Alaska DNR Case Summary File Type: ADL File Number: 28280 Printable Case File Summary See Township,Range, Section and Acreage? ( New Search Yes 0 No LAS Menu I Case Abstract I Case Detail I Land Abstract File: ADL 28280 ___"_"?P Search for Status Plat Updates As of 06/29/2010 Customer: 000107377 BP EXPLORATION(ALASKA)INC PO BOX 196612/900 E.BENSON BL ATTN: LAND MANAGER- ALASKA ANCHORAGE AK 995196612 Case Type: 784 OIL&GAS LEASE COMP DNR Unit: 780 OIL AND GAS File Location: DOG DIV OIL AND GAS Case Status: 35 ISSUED Status Date: 08/19/1965 Total Acres: 2560.000 Date Initiated:05/28/1965 Office of Primary Responsibility:DOG DIV OIL AND GAS Last Transaction Date: 12/04/2006 Case Subtype: NS NORTH SLOPE Last Transaction: AA-NRB ASSIGNMENT APPROVED Meridian: U Township: 011N Range: 013E Section: 01 Section Acres: 640 Search Plats Meridian: U Township: 011N Range: 013E Section: 02 Section Acres: 640 Meridian: U Township: 011N Range: 013E Section: 11 Section Acres: 640 Meridian: U Township: O11N Range: 013E Section: 12 Section Acres: 640 Legal Description 05-28-1965 ***SALE NOTICE LEGAL DESCRIPTION*** C14-91 T11N, R13E, UM 1, 2, 11, 12 2,560.00 07-07-1987 ***LISBURNE PARTICIPATING AREA DESCRIPTION T. 11 N., R.13 E., U.M. SECTION 1:ALL 640 ACRES SECTION 12:ALL 640 ACRES http://dnr.alaska.gov/proj ects/las/Case_Summary.cfm?FileType=ADL&FileNumber=2828... 6/29/2010 TRANSMITTAL LETTER CHECKLIST WELL NAME 7 " O•'8 PTD# /00.7? ✓ Development Service Exploratory Stratigraphic Test Non-Conventional Well FIELD: 3e1/444/06' 3 QY POOL: .e- e//Dii-/m- fm/ O/G Circle Appropriate Letter/Paragraphs to be Included in Transmittal Letter CHECK ADD-ONS WHAT (OPTIONS) TEXT FOR APPROVAL LETTER APPLIES MULTI LATERAL The permit is for a new wellbore segment of existing well (If last two digits in Permit No. ,API No. 50- - - . API number are between 60-69) Production should continue to be reported as a function of the original API number stated above. PILOT HOLE In accordance with 20 AAC 25.005(f), all records, data and logs acquired for the pilot hole must be clearly differentiated in both well name ( PH) and API number (50- - - ) from records, data and logs acquired for well SPACING The permit is approved subject to full compliance with 20 AAC EXCEPTION 25.055. Approval to perforate and produce / inject is contingent upon issuance of a conservation order approving a spacing exception. assumes the liability of any protest to the spacing exception that may occur. DRY DITCH All dry ditch sample sets submitted to the Commission must be in SAMPLE no greater than 30' sample intervals from below the permafrost or from where samples are first caught and 10' sample intervals through target zones. Non-Conventional Please note the following special condition of this permit: Well production or production testing of coal bed methane is not allowed for (name of well) until after (Company Name) has designed and implemented a water well testing program to provide baseline data on water quality and quantity. (Company Name) must contact the Commission to obtain advance approval of such water well testing program. Rev: 1/11/2008 To N 0) 0 a) 0- N (n a) ❑ O N _ N C Q C 0 a) O co 0 > L 2 ❑ O L a L 7 N C _ L E 2 0 3 E O O. 0) N d 2 C EO CO LL = a Co c N 0 L o 7 o) c 3 coo a > .o _ a a 0 :n a) C L -O = _ a) m o > C E n 0_ > Co D N - 9 0 0 2 (i o 7 ° w E a) u, Q = o oa © @ C Ts o Fi co a o (°0 Z a 0 o CO E c o m r- o m a• >- c z a LL 12 O Q Q m • O N O N co V II a 1) 0 co 0 N < ° w a) 0 w 0 o a LL a ° N N 3 <� c = LL N 2. as Q LL c - a 0' of O M - m' a III o°o rn ° c 0 v°)i in a m N a LL• N Q) 0) N L co aj N LL LL cc N U C o- 0 co # - 0) O) .N a .3 •T m n '(.7) o a) O V a) C C U CO C a C n o O r N N O N (0 ii "iri m C a n m 'C (0 CO CO I @ (. co 0 0 0 0 - n >, a E N ❑ N z N 7 U U U C Q o E 0 `O II C N Y a CO a) 7 N a) L LL O a) ❑ N o 7 z O N ° ° O O N Q N N W m O co a) a 0 CC M LL 2 2 I 2 a > tu Q a) a) a) aN) a) a) a) Cl)) Cl)) a) a) a) Q Q Q Q Q Q Q Q CO a) a) a) a) Q a) a) a) a) a) co N Q 0 Q Q Q Q n z >- >- >- >- >- >- >- >- >- >- >- >- Z Z Z z Z Z Z Z >- >- >- >- >- Z >- >- >- >- >- >- z z z z z z >. F N O cu _ N — ; ❑ m C O --co- o c To a) as E E 3 - E a) hio Z o _1 c O >. 0 0 I m N N Q a C3 �O N N C > C v C J a a) a L a 4. Q o N N J 0 C as co N m C > N w } DI o 3 0 ° " n o - n o rx -0 N N Q O a`> 7 a) io @ > w ❑ o 0 o a m ° o M ° 0 N CO m ._ L O N (6 7 3 0 C m L a($ E N j Q 7 < CO N a) W - V 0 C V O a> C a m N Q • ❑ 00 C a) m O 0 o) a) i LL N C C N C N O O Q E E a c c E o M c c n r c° o ats c y a) a ° r n c c O Y o o $ c7i "0 o@ w 23 o o Q o o °) 7 U ° a ° a) °- a ° 3 > @ ,-'� 'N I Q a o a) a> c .c > o > > ° a m .m o 0 0 0 0 �° o m m s Q a n o 0 0 a) v E a 0 c) a> o o a) c n Z o E 3 a) o a) L Ti o v 3 fu a LL Q m 7 -O o o N <° m O L L L (0 -67 E aa) C C - N '- = O On N On d 3 O .0 T c co @ N N co M m co a) W o z Q a c • a `-° 3 .§- > a) ,• o o �' ° o u", n .a m o 3 o r ° 0 O 0 0 c ° •`0 > 0 0 .n a a o m p o c o 0 0 o c CT o N a a) m 0 0) c a n N 7 a) LL ) m a) CO 0, a> a> 0 Y a> o E 0 E L 0 m N c F 0 d -o N N -0 N 7 7 n C V 0 U `O- ° - a a) -p l6 E 0) O (n 7 co O 0t3 d a) n d a N N d O C 0 N CO O c L a U a) E @ O O m N p n n r 'C N O) a N (6 (0 m 0) m o N 01 3 I p N N 0• a) O m m c n n 2 N >„ m a> a> a) 3 c -0 0 c) 0 o• m c c m .n •7 a w m o 3 0 a) 0 i, 5 a) LL a m E N N N N O L Q a L N L a) C N al o '2 L 3 N _o o 1)) .0 00 a) <V -a, N c o N ▪ w• 7 (6 co _co N m 3 E m 3 7 a) `0 0 co (6 U N N _ a) w a a) m = C U N m U C w y C 3 0 0 0 N N O O .0 .0 N U N a0 C U a) O O a f0 "O (Q r Ul n E ' N E 0 a) U a - Q_ .E N o 0 0 •- .0 a m E E n -° N n ° a n) I- I- I- 0' 1- 6 > m a a Y a U 'E m E a m ai Y T a" a 'E a 71"7-) a n 4 a) a> m °) 3 2 o o a 2 2 2 m a m -0 = O O, a 0 N m m m '5 am) o m o o o_ _I D co � 0 0 a a 0 ¢ a z c.) (n c.) c� c) c.) Q ' Q O m m c. _ 2 a ❑ co cn 0 W n 0 N M V (() (0 h CO 0) O N M V (() (O I- 00 0) o N M V l0 (0 r aD 0) I - N CO V (() CO h N 0) - N N N N N N N N N N M M M M M M M M M M • (:--) p O p .. I- a) O a) o co O C - O C N N U CV ID et r- 0 0 rn 0 0 0) rnN W o co N C � N O N a O w co •0 >' co C0 E _!- it a (n _ a cn 0 a v7 U W °IQ a s w a a a 3 Well History File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history file. To improve the readability of the Well History file and to simplify finding information, information of this nature is accumulated at the end of the file under APPENDIX. No special effort has been made to chronologically organize this category of information. tapescan.txt **** REEL HEADER **** MWD 10/11/15 BHI 01 LIS Customer Format Tape **** TAPE HEADER **** MWD 10/08/18 3317848 01 3" CTK *** LIS COMMENT RECORD *** 111111 , 111111111111 Remark File Version 1.000 IIIIII ! IliiiI11111I Extract File: ldwg.las version Information VERS. 1.20: CWLS log ASCII Standard -VERSION 1.20 WRAP. NO: One line per frame well Information Block #MNEM.UNIT Data Type Information STRT.FT 8393.5000: Starting Depth STOP.FT 11681.0000: Ending Depth STEP.FT 0. 5000: Level Spacing NULL. -999.2500: Absent value COMP. COMPANY: BP Exploration (Alaska) , Inc. WELL. WELL: F-04B FLD . FIELD: Prudhoe Bay Unit LOC . LOCATION: 70 deg 20' 7.875"N 148 deg 46' 1. 527"W CNTY. COUNTY: North Slope Borough STAT. STATE: Alaska SRVC. SERVICE COMPANY: Baker Hughes INTEQ TOOL. TOOL NAME & TYPE: 3" CTK DATE. LOG DATE: 18 Aug 2010 API . API NUMBER: 500292008902 -Parameter Information Block #MNEM.UNIT Value Description SECT. 02 Section TOWN.N T11N Township RANG. R13E Range PDAT. MSL Permanent Datum EPD .F 0 Elevation Of Perm. Datum LMF . KB Log Measured from FAPD.F 51.70 Feet Above Perm. Datum DMF . KB Drilling Measured From EKB .F 51.70 Elevation of Kelly Bushing EDF .F 0 Elevation of Derrick Floor EGL .F 0 Elevation of Ground Level Page 1 acv-o�� c-oSf3 tapescan.txt CASE.F N/A Casing Depth 051 . DIRECTIONAL Other Services Line 1 Remarks (1) All depths are Measured Depths (MD) unless otherwise noted. (2) All depths are Bit Depths unless otherwise noted. (3) All True vertical Depths (TVDSS) are Subsea corrected. (4) All Formation Evaluation data is realtime data. (5) Baker Hughes INTEQ utilized CoilTrak downhole tools and the Advantage surface system to log this well . (6) Tools ran in the string included Casing Collar Locator, an Electrical Disconnect and Circulating Sub, a Drilling Performance Sub (Inner and Outer Downhole Pressure, Vibration and Downhole weight on Bit) , a Directional and Gamma Sub, and a Hydraulic Orienting Sub with a Near Bit Inclination Sensor. (7) Data presented here is final and has been depth shifted to a Primary Depth Control (PDC) log provided by Schlumberger GR CNL dated 20 Aug 2010 per Jennifer Flight with BP Exploration (Alaska) , Inc. (8) The sidetrack was drilled from F-04 through a milled window in a 4 1/2 inch liner. Top of window 9649 ft.MD (8293.4 ft.TVDSS) Bottom of window 9656 ft.MD (8299.8 ft.TVDSS) (9) Tied to F-04 at 9600 feet MD (8253.3 feet TVDSS) . (10) The interval from 11658 ft to 11681 ft MD (8988.2 ft. to 8987.9 ft. TVDSS) was not logged due to sensor to bit offset at well TD. MNEMONICS: GRAX -> Gamma Ray [MWD] (MWD-API units) ROP AVG -> Rate of Penetration, feet/hour TVDSS -> True Vertical Depth (Subsea) CURVE SHIFT DATA BASELINE, MEASURED, DISPLACEMENT 8394.45, 8395.89, ! 1.43652 8399.99, 8402.05, ! 2.05273 8402.46, 8403.69, ! 1.23145 8405.33, 8406.56, ! 1.23145 8409.23, 8410.46, ! 1.23145 8428.67, 8428.67, ! 0 8444.48, 8443.65, ! -0.821289 8447.76, 8447.35, ! -0.411133 8452.48, 8452.28, ! -0.205078 8459.66, 8460.9, ! 1.23145 8468.08, 8468.9, ! 0.820312 8473.21, 8473.62, ! 0.410156 8480.31, 8480.93, ! 0.615234 8482.78, 8483.6, ! 0.820312 8487.5, 8487.5, ! 0 8493.45, 8493.65, ! 0.205078 8495.54, 8495.95, ! 0.410156 8500.02, 8499.81, ! -0.205078 8504.94, 8505.76, ! 0.821289 8509.08, 8509.9, ! 0.821289 8512.16, 8512.78, ! 0.616211 8517.09, 8517.7, ! 0.616211 8522.83, 8524.48, ! 1.6416 8525.3, 8526.94, ! 1.6416 8528.38, 8530.22, ! 1.84766 8538.43, 8540.69, ! 2.25781 8541.51, 8543.15, ! 1.6416 8547.05, 8549.31, ! 2.25781 8552.18, 8554.03, ! 1.84766 8555.91, 8559.61, ! 3.69434 8559.81, 8562.69, ! 2.87305 Page 2 tapescan.txt 8561.86, 8564. 53, ! 2.66895 8576.64, 8577.87, ! 1.23145 8590.63, 8590.63, ! 0 8592.69, 8592.89, ! 0.205078 9644.61, 9645.84, ! 1.23145 9646.26, 9647.49, ! 1.23145 9653.85, 9654.47, ! 0.616211 9658.16, 9657.96, ! -0.205078 9661.65, 9661.65, ! 0 9663.29, 9664.32, ! 1.02637 9665.55, 9666.17, ! 0.615234 9678.89, 9679.1, ! 0.205078 9683.64, 9684.67, ! 1.02637 9697.81, 9697.81, ! 0 9710.33, 9707.86, ! -2.46387 9714.64, 9712.79, ! -1.84668 9719. 56, 9716.08, ! -3.48926 9724.73, 9722.68, ! -2.05273 9731.47, 9729.83, ! -1.6416 9734.58, 9735.2, ! 0.615234 9739.71, 9740. 53, ! 0.821289 9743.41, 9744.43, ! 1.02637 9748.33, 9749.97, ! 1.6416 9751.82, 9752.23, ! 0.410156 9753.7, 9753.7, ! 0 9757.36, 9758.18, ! 0.821289 9759.01, 9759.62, ! 0.615234 9761.71, 9761.09, ! -0.616211 9765.2, 9765.61, ! 0.410156 9770.33, 9769.1, ! -1.23242 9782.03, 9781.62, ! -0.411133 9786.13, 9786.34, ! 0.206055 9795.61, 9795.4, ! -0.205078 9798.69, 9798.89, ! 0.205078 9804.84, 9805.46, ! 0.615234 9808.33, 9808.33, ! 0 9809.77, 9810.8, ! 1.02637 9812.64, 9813.05, ! 0.411133 9814.08, 9814.7, ! 0.615234 9824.58, 9824.38, ! -0.206055 9826.84, 9827.04, ! 0.205078 9830.33, 9830.94, ! 0.615234 9831.56, 9832.59, ! 1.02637 9832.59, 9833.41, ! 0.820312 9837.51, 9837.51, ! 0 9844.32, 9845.34, ! 1.02539 9848.39, 9848.6, ! 0.206055 9856.63, 9857.25, ! 0.616211 9858.48, 9859.1, ! 0.615234 9860.74, 9861.56, ! 0.821289 9863.2, 9863.2, ! 0 9867.1, 9867.92, ! 0.820312 9869.36, 9869.97, ! 0.616211 9871, 9871.82, ! 0.821289 9876.54, 9877.57, ! 1.02637 9884.75, 9885.57, ! 0.821289 9890.42, 9891.65, ! 1.23145 9903.14, 9903.76, ! 0.616211 9906.02, 9906.84, ! 0.821289 9908.07, 9909.1, ! 1.02539 9914.23, 9914.84, ! 0.616211 9923.05, 9922.44, . -0.616211 9929.01, 9928.8, ! -0.205078 Page 3 tapescan.txt 9932.91, 9934.14, ! 1.23145 9935. 57, 9936.39, ! 0.820312 9943.14, 9944.58, ! 1.4375 9953.61, 9955.05, ! 1.4375 9975.96, 9976.58, ! 0.616211 9979.65, 9980.89, ! 1.23145 9986.43, 9987.45, ! 1.02637 9989.3, 9990.12, ! 0.820312 9996.9, 9998.74, ! 1.84766 10003.1, 10004.3, ! 1.23145 10009.6, 10010.9, ! 1.23242 10012.2, 10013.8, ! 1.64258 10016.9, 10016.1, ! -0.820312 10019.2, 10017.9, ! -1.23145 10023.7, 10025.7, ! 2.05273 10028, 10029.6, ! 1.6416 10032.1, 10033.7, ! 1.6416 10034.1, 10036.2, ! 2.05273 10044.6, 10046.6, ! 2.05176 10055.5, 10057.1, ! 1.64258 10068, 10069.8, ! 1.84766 10072.3, 10074.3, ! 2.05273 10085.5, 10087.1, ! 1.6416 10095.3, 10097.2, ! 1.84766 10104.2, 10106.2, ! 2.05273 10110.5, 10112.2, ! 1.6416 10124.7, 10126.7, ! 2.05273 10129.7, 10131.7, ! 2.05273 10136.8, 10138.5, ! 1.6416 10149.6, 10151.6, ! 2.05176 10151.6, 10154.1, ! 2.46387 10154.1, 10156.1, ! 2.05176 10156.1, 10158.6, ! 2.46387 10159.6, 10162.1, ! 2.46387 10172.1, 10172.5, ! 0.411133 10178.7, 10178.9, ! 0.205078 10181.8, 10182.4, ! 0.615234 10184.2, 10184.8, ! 0.616211 10186.3, 10186.7, ! 0.410156 10194.2, 10194.8, ! 0.616211 10197.7, 10197.9, ! 0.205078 10202, 10201.6, ! -0.411133 10206.3, 10207.4, ! 1.02539 10210.2, 10211.9, ! 1.6416 10222.6, 10222.8, ! 0.205078 10239.2, 10240.2, ! 1.02637 10241.4, 10242.7, ! 1.23145 10254.6, 10255.8, ! 1.23145 10257.7, 10258.5, ! 0.821289 10267.8, 10269, ! 1.23145 10293.6, 10294.4, ! 0.821289 10300, 10301.2, ! 1.23145 10304.3, 10306.1, ! 1.84668 10311.7, 10312.7, ! 1.02637 10325.2, 10326.6, ! 1.43652 10333.6, 10334.6, ! 1.02637 10336.5, 10337.7, ! 1.23145 10342.6, 10343.9, ! 1.23145 10347.4, 10348.6, ! 1.23242 10351.5, 10352.7, ! 1.23145 10354.1, 10355.6, ! 1.4375 10358, 10358.9, ! 0.821289 10361.9, 10364.5, ! 2.66895 Page 4 tapescan.txt 10368, 10370.9, ! 2.87305 10375, 10376.2, ! 1.23145 10379.1, 10380.9, ! 1.84766 10391.8, 10394.7, ! 2.87305 10402, 10404.1, ! 2.05273 10407.3, 10409.6, ! 2.25781 10409.4, 10411.6, ! 2.25781 10412.3, 10415.1, ! 2.87305 10419.2, 10420.7, ! 1.43652 10427.7, 10430.5, ! 2.87402 10440.6, 10442.8, ! 2.25781 10442.6, 10446.1, ! 3.48926 10446.7, 10449.6, ! 2.87305 10452.3, 10455.6, ! 3.28418 10462.1, 10463.6, ! 1.4375 10468.1, 10468.3, ! 0.205078 10485.1, 10485.1, ! 0 10487.6, 10486.7, ! -0.821289 10492.5, 10491.3, ! -1.23145 10496.6, 10496.2, ! -0.411133 10510.1, 10509.3, ! -0.820312 10525.1, 10524.9, ! -0.205078 10528, 10528.2, ! 0.205078 10629.7, 10634.6, ! 4.92676 10633.8, 10637.9, ! 4.10449 10652.8, 10655.7, ! 2.87305 10666.1, 10670.2, ! 4.10547 10706.9, 10708.6, ! 1.64258 10724, 10727.9, ! 3.89941 10743.7, 10749.8, ! 6.1582 10814, 10812.8, ! -1.23145 10825.3, 10824.9, ! -0.411133 10871.4, 10873.3, ! 1.84766 10885.1, 10882.6, ! -2.46387 10890.4, 10888, ! -2.46289 10904.4, 10904.6, ! 0.206055 10912, 10912, ! 0 10918.7, 10917.3, ! -1.43652 10925.7, 10925.1, ! -0.615234 10927, 10926.3, ! -0.615234 10931.7, 10930.9, ! -0.820312 10937.6, 10937, ! -0.615234 10950.5, 10950.5, ! 0 10957.7, 10955, ! -2.66797 10978.5, 10978.5, ! 0 10983, 10983.4, . 0.410156 11013.7, 11013.5, ! -0.205078 11021.5, 11020.7, ! -0.821289 11023.6, 11022.7, ! -0.821289 11028.1, 11027.7, ! -0.411133 11032.8, 11035, ! 2.25781 11040.6, 11042, ! 1.43652 11050.2, 11050.9, ! 0.616211 11053.5, 11054.1, ! 0.615234 11057.4, 11059.3, ! 1.84766 11197.1, 11199.6, ! 2.46289 11204.1, 11206.1, ! 2.05176 11207.4, 11210.2, ! 2.87402 11210.6, 11213.9, ! 3.28418 11216, 11218.8, ! 2.87402 11222.7, 11226.8, ! 4.10547 11226.8, 11228.7, ! 1.84668 11231.8, 11234.6, ! 2.87305 Page 5 tapescan.txt 11238.5, 11240.6, ! 2.05273 11246.7, 11249.2, ! 2.46289 11255.4, 11259.1, ! 3.69434 11263.2, 11266.9, ! 3.69434 11268.1, 11270.8, ! 2.66895 11269.2, 11272.4, ! 3.28418 11272.4, 11275.9, ! 3.48926 11277.6, 11281.5, ! 3.89941 11285.6, 11289.1, ! 3.48926 11290, 11292.6, ! 2.66797 11297.5, 11298.8, ! 1.23145 11299.8, 11300.6, ! 0.820312 11302.5, 11303.3, ! 0.821289 11307.8, 11307.8, ! 0 11314.2, 11315.6, ! 1.43652 11318.3, 11318.3, ! 0 11345.8, 11349.3, ! 3.48926 11352.2, 11355.5, ! 3.28418 11354, 11357.1, ! 3.0791 11356.5, 11359.2, ! 2.66797 11363.3, 11365.7, ! 2.46289 11367.4, 11369.8, ! 2.46387 11371.6, 11375.5, ! 3.90039 11373.3, 11377.4, ! 4.10449 11379.9, 11381.5, ! 1.64258 11382.5, 11383.3, ! 0.820312 11390.5, 11392, ! 1.43652 11392.4, 11393.8, ! 1.4375 11398.5, 11399.6, ! 1.02637 11403.5, 11405.3, ! 1.84766 11414.5, 11413.8, ! -0.616211 11418.4, 11418.6, ! 0.206055 11422.5, 11423.5, ! 1.02637 11432.7, 11433.6, ! 0.821289 11442.4, 11442.6, ! 0.206055 11446.5, 11444.8, ! -1.6416 11448.3, 11446.5, ! -1.84766 11450.6, 11452.6, ! 2.05176 11454.9, 11457.4, ! 2.46289 11463.1, 11466, ! 2.87305 11470.6, 11473.3, ! 2.66895 11479.7, 11481.9, ! 2.25781 11488.3, 11492.2, ! 3.89941 11511.1, 11510.9, ! -0.205078 11516.5, 11519.4, ! 2.87305 11524.3, 11528.2, ! 3.89941 11534.8, 11537.5, ! 2.66797 11540.5, 11541.5, ! 1.02637 11564.3, 11568, ! 3.69434 11570.9, 11575.8, ! 4.92676 11585.8, 11586.5, ! 0.616211 11601.9, 11603.7, ! 1.84766 11616.8, 11618.1, ! 1.23145 11620.1, 11621.8, ! 1.64258 11631.7, 11632.7, ! 1.02637 11641.1, 11641.1, ! 0 11645.8, 11648.3, ! 2.46289 EOZ END ! BASE CURVE: GROH, OFFSET CURVE: GRAX Tape Subfile: 1 347 records. . . Page 6 tapescan.txt Minimum record length: 10 bytes Maximum record length: 132 bytes **** FILE HEADER **** MWD .001 1024 *** LIS COMMENT RECORD *** 1111 ! ! ! ! IIIIII11111 Remark File Version 1.000 The data presented here is final and has been depth shifted to a Primary Depth Control (PDC) log provided by schlumberger GR CNL dated 20 Aug 2010 per Jennifer Flight with BP Exploration (Alaska) , Inc. * FORMAT RECORD (TYPE# 64) Data record type is: 0 Datum Frame Size is: 12 bytes Logging direction is down (value= 255) Optical Log Depth Scale Units: Feet Frame spacing: 0.500000 Frame spacing units: [F ] Number of frames per record is: 84 One depth per frame (value= 0) Datum Specification Block Sub-type is: 1 FRAME SPACE = 0. 500 * F ONE DEPTH PER FRAME Tape depth ID: F 2 Curves: Name Tool Code samples Units Size Length 1 GR MWD 68 1 AAPI 4 4 2 ROP MWD 68 1 F/HR 4 4 8 Total Data Records: 79 Tape File Start Depth = 8393. 500000 Tape File End Depth = 11683. 500000 Tape File Level Spacing = 0. 500000 Tape File Depth Units = feet **** FILE TRAILER **** Tape Subfile: 2 88 records. . . Page 7 tapescan.txt Minimum record length: 54 bytes Maximum record length: 4124 bytes **** FILE HEADER **** MWD .002 1024 *** LIS COMMENT RECORD *** m11111 , 1111111111 Remark File version 1.000 This file contains the raw-unedited field MWD data. * FORMAT RECORD (TYPE# 64) Data record type is: 0 Datum Frame Size is: 12 bytes Logging direction is down (value= 255) optical Log Depth Scale Units: Feet Frame spacing: 0.250000 Frame spacing units: [F ] Number of frames per record is: 84 one depth per frame (value= 0) Datum specification Block Sub-type is: 1 FRAME SPACE = 0.250 * F ONE DEPTH PER FRAME Tape depth ID: F 2 Curves: Name Tool Code Samples units Size Length 1 GR MWD 68 1 AAPI 4 4 2 ROP MWD 68 1 F/HR 4 4 8 Total Data Records: 157 Tape File Start Depth = 8392.000000 Tape File End Depth = 11681.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = feet **** FILE TRAILER **** Tape Subfile: 3 166 records. . . Minimum record length: 54 bytes Maximum record length: 4124 bytes Page 8 tapescan.txt **** TAPE TRAILER **** MWD 10/08/18 3317848 01 **** REEL TRAILER **** MWD 10/11/15 BHI 01 Tape subfile: 4 2 records. . . Minimum record length: 132 bytes Maximum record length: 132 bytes 0 Tape Subfile 1 is type: LIS 0 Tape Subfile 2 is type: LIS DEPTH GR ROP 8393.5000 -999.2500 -999.2500 8394.0000 38.5848 -999.2500 11683.5000 -999.2500 -999.2500 Tape File Start Depth = 8393. 500000 Tape File End Depth = 11683.500000 Tape File Level Spacing = 0.500000 Tape File Depth Units = feet 0 Tape subfile 3 is type: LIS DEPTH GR ROP 8392.0000 -999.2500 -999.2500 8392.2500 -999.2500 -999.2500 11681.0000 -999.2500 -999.2500 Tape File start Depth = 8392.000000 Tape File End Depth = 11681.000000 Tape File Level Spacing = 0.250000 Tape File Depth units = feet 0 Tape Subfile 4 is type: LIS Page 9