Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
HOME
EVENTS
DATA
Data List
Drilling
Production
Orders
Data Miner
Document Search
REPORTS
Reports and Charts
Pool Statistics
FORMS
LINKS
Links
Test Notification
Data Requests
Regulations
Industry Guidance Bulletins
How to Apply
ABOUT US
History
Staff
HELP
Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
188-024
Ima ect Well History File' Cove~ge XHVZE This page identifies those items that were not scanned during the initial production scanning phase. They are available in the original file, may be scanned during a special rescan activity or are viewable by direct inspection of the file. N DIGITAL DATA ems: [3 Other. No/Type [3 Poor Quality Originals: Other: NOTES: ~_______~._~~ BY: BEVERLY BREN VINCENT SHERYL MARIA LOWELl. DATE; OVERSIZED (Scannable) [] Maps: [] Other items scannable by large scanner OVERSIZED (Non-Scannable) Logs of various kinds Other IS/ Project Proofing BY: BEVERLY BREN VINCENT SHERYL MARIA LOWELl_ DATE: IS~ Scanning Preparation /_~ x 30 = ,,~'~+! BY: BEVERLY BREN VINCENT SHERYL MARIA LOWELL DATE: /SI Production Scanning Stage I PAGE COUNT FROM SCANNED FILE: PAGE COUNT MATCHES NUMBER IN SCANNING PREPARATION: ~"/YES NO IF NO IN STAGE 1, PAGE(S) DISCREPANCIES WERE FOUND: YES NO · - ...... ,~REN VINCENT SHERYL MARIA LOWELL DATE: I$1 BY: Stage 2 (SCANNING IS COMPLETE AT l I'~lo, _ SPECIAL ATTENTION IS REQUIREO ON AN INOIVIOUAL PAGE BASIS OUE TO QUALITY. GRAy$CALE OR COLOR H~IAGE S) ReScanned (individual page [special attention] scanning completed) RESCANNEDBY~REN VINCENT SHERYL MARIA LOWELL General Notes or Comments about this file: IIIIIIIIIIIIIIIIII Quality Checked (,done) 10125/02Rev3 NOTScanned.wpd ~Date ALASKA OIL AND GAS CONSERVATION CfI'~MISSION bMLqbkNICJYL INrFLILITY TEST --- ~ ' PREIEST START 15 MLH' 30 MLN ' ' *P *I TYPE OF PKR CASING TBG REQ ~%~JG " TIbM TIME TIME W~ L *S --- ANNULUS 2~D SIZE/W]7/GRADE SIZE TEST CSG TBG TBG *}! *N FLUID MD PRESS PRESS CSG .CSG CSG PRESS PRESS PRESS , ,, ~.0~,~ ~,~,oo, ?/~o ~ ' .... ~ ...... ~M -z~oq /o// ,, e ,, , ,,, ,,, , , e , .... __ __ ,, ,,, , , , , , , , ! · , , , i llllll I I II I I I ! I I I A~JIAR FLUID: DIESEL GLYCOL SALT WA/MK DRT~ ~.ING *IUBING INJECTION FLUID: PRODUCE WAIER IN3 SALT WATER INJ' MISCIBLE LNJEC1/ON INJECTING N-NOT ~ AOC, CC WITNESS SIGNATURE - Z ~'°'~,~f -' ~C~N~ED OEO 1 9 200~ 20 AAC 25.030(a) 20 AAC 25.412(c) 20 AAC 25.252(d) P~ ,SCANNED DEC :I. 9 2002 04-19 Marker Pics Subject: 04-19 Marker Pies Date: Tue, 9 Apr 2002 19:05:07 -0500 From: "Hubble, Terrie L" <HubbleTL~BP.com> To: "~oob_fleckenstein~admin.state. ak.us"' <bob_fleckenstein~admin.state.ak.us> Hi Bob, Here are some Geologic Markers for the orignal 04-19. I am sorry that Arco did not provided them originally... I assume it was because this was a fairly shallow disposal well. 04-19 (Plugged Back for Sidetrack, Approval #: 301-294) Permit #: 188-024 API#: 50-029-21791-00 Name MD TVD SV4 3360" 3360 SV3 3842' 3842 SV2 4035' 4035 SVl 4443' 4443 Ugnu 4A 5068' 5068 West Sak 2 6484 colville Mudstone 3 6484' 6930' 6930' Terrie Hubble GPB Drilling & Wells 564-4628, MBS-l, Cube 830 1 of 1 04/10/2002 6:41 AM PT:UGG!N~-= LOCATION CL~.'A_~_NCE REPORT Sta=a cf A!ask= Name . , Cc era~-~.. ~ ' Review ~h~m we!! fi!e, amd.' ct~---~C cz~ pluq~g, well hea~ sUaCus, ' '.ocaui - ea~c, ' . ' ' .om. c!e~. co~e. 91uqs: .Ha~ke= '.:on= cc' .:laCe: Locac-Lcn CLears.nc Conclusions: , ,_,. ---.- STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG Plugged Back for Sidetrack 1. Status of we'll ............. classificati0~ 'Of Service Well r-! Oil I'-I Gas I-I Suspended IR! Abandoned I"1 Service Cretaceous Disposal Well 2. Name 0i Operator ............... 7. Permit Number " BP Exploration (Alaska) Inc. 188-024 301-294 , 3. Address 8. APl Number P.O. Box 196612, Anchorage, Alaska 99519-6612 50-029-21791-00 , 4. Location of well at surface ii~~! 9. Unit or Lease Name 912' NSL, 254' EWL, SEC. 26, T11N, R15E, UM Prudhoe Bay Unit At top of productive interval 912' NSL, 254' EWL, SEC. 26, T11N, R15E, UM At total depth 10. Well Number 903' NSL, 248' EWL, SEC. 26, T11 N, R15E, UM . , 04-19i 5. Elevation in feet (indicate KB, DF, etc.) 6. Lease Designation and Serial No. 11. Field and Pool Prudhoe Bay Field / Prudhoe Bay Pool RKB = 60' ADL 028324 12. Date' SpL~'dded 03/30/1988 113' Date T'D' 'Reached 114' Date C°mp" Susp" °r Aband'04/05/1980 11/11/2001 115' water depth' if °fish°re N/A MSL 116' N°' °f C°mpleti°ns Zero 17. Total' Depth (MD+TVD) 1 i81 Plug Back Depth (MD+TVD) 119. Directional Survey 1 20. Depth where sssv s~t1 21. Thickness of Permafrost 7000 ,7000 FTI 6992 6992 FTI r-lYes I~NoI . N/A, MDI 1900'(Approx.) 22. 'Type Electric or Other Logs Run .... DIL / SONIC / GR / SP / CAL, GR / CAL, RFT, CBT / CET / GR, MWD 23. ' ..... '.' .'" ..' ......... CA~iNG,'"Li~ii~i~ AND CEMENTING'"R'~:(~I~'D .... ' .' .' , "...': .."..'.. '..' .... '. '. ' CASING SE'I-rING DEPTH HOLE SIZE WT. PER FT. GRADE ToP BOTTOM SIZE CEMENTING RECORD AMOUNT PULLED 20,, ., , 91.5# H-40' Surfac~ '"115, 30. 2150"#'Poleset ..... 13-3/8" 68# / 72# K-55 / L-80 Surface 2984' 1:/-1/2;';)500 sx CS II1~ 600 sx CS' I1'" . ..... ' ......... . . 9-5/8" 47# L-80 Surface 6993' 12-1/4" 1350 sx Class 'G, 300 sx CS I 4'1/.2"'. 15.1# L-80 4525' '5893' Sc,.ab 3!.9'.Sx ciass 'G' (Approx.) . ' ..... 24. Perforations open to Production (MD+TVD of Top and 25. TUBING RECORD Bottom and interval, size and number) SI~E DEPTH SET (MD) PACKER SET (MD) None None MD TVD MD TVD 26. AC~D, FRACTURE, CEMENT SQUEEZE, ETC. .DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED P&A w/85 Bbls Class 'G' 5250' Set CIBP 5025' Lay in 6.5 Bbls Class 'G' on top of CIBP 3886' Set EZSV with Whipstock on iop 2'~'. .......... P'R~DUC'rI~ TEST ........ Da'{e FirSt Production I Method of Opera{io~ (Flowing, gas lift, etc.) .............. Not on ProductionI N/A , Date of Test Hours Tested PRODUCTION FOR' 'OiL-B~. ..... G~s-McF ..... ~A:rE~-BB~." ' CHOKE' SiZE I GAS-O'~L RATIO TEST PERIOD I , , 151~'W Tubing Casing Pressure CAL(~UI~A~I:D OIL-BB~ ' ' ' GAS'M(~F" W.~TER'BBL OIL GRA~/~TY'API (CORR) Press. 24-HOUR RATE 28. CORE DATA Brief descripti~n"'°f litholog~, Por;:)si~y, fractures,' appa~'re~t dip~'a'nd presence of oil, gas or water. Submit E IVE__D No core samples were taken. APR 5 Form 10-407 Rev. 07-01-80 Submit In Duplicate 29. Geologic Markers 30. Formation Tests ..... Measured True Vertical 'ir~c~u~e ir~t~r~'l't~ied, pre~sure'dat~, ~11 fluids recovered and Marker Name Depth Depth gravity, GOR, and time of each phase. N/A RECEIVED 5 200 31. List of'Attachments: . st~mmary of DailY/Drilling Reports ............................... 32. I here~y 'certify t~at the foregoing is true and correct to the best of my knowledge Signed TerrieHubble~""~.,~~___~ Title TechnicalAssistant Date Oq,0~'.-.O~, 04-19i 188-024 301-2.94 Prepared By Name/Number: Terrie Hubble, 564-4628 Well Number Permit No. / A.p.p..roval .No. . ............. INSTRUCTIONS GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. ITEM 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. ITEM 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. ITEM 16 MD 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. ITEM 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). ITE~a 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. ITEM 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, Other-explain. ITEM 28: If no cores taken, indicate 'none'. Form 10-407 Rev. 07-01-80 ...... !.~.- Well: 04-19Ai Rig Accept: 11/28/01 Field: Prudhoe Bay Unit Rig Spud: 12/03/01 APl: 50-029-21791-01 Rig Release: 12/22/01 Permit: 201-218 Drillin~ Rig: Nabors 2ES PRE-RIG WORK 09/24/01 PPPOT-IC PASSED/MITOA PASSED. 10/16/01 ALL TBG HANGER LDS FUNCTION TESTED OK PRE-RIG. 10/18/01 MIT-IA TO 2500 PSI (FAILED) FOR PRE-RIG. 11/O9/01 DRIFTED TUBING TO 5945' CORR WITH A 2.5" CENTRALIZER - BACK WITH SAMPLE OF INJECTOR SLURRY. WELL LEFT SHUT IN. 11/11101 MIRU DS CTU #3. PU 2.25" BDN. RIH. KILL WELL WITH 1% KCL (NS). MIX AND PUMP 25 BBLS CLASS G CEMENT WITH AGGREGATE IN 19 BBLS MIXED AT 10 LBS/BBL. UNABLE TO BUILD SQUEEZE PRESSURE. (25 BBLS BEHIND PIPE). CONTAMINATE AND PREP FOR REZQUEEZE. 11/12/01 PUMP 25 BBLS 15.8 PPG CEMENT (3 NEAT, 19 WITH 15 PPB AGGREGATE, 3 NEAT) UNABLE TO BUILD SQUEEZE PRESSURE. RIH AND CONTAMINATE TO TT. PUH TO 4000', WAIT ON MORE CEMENT. MIX AND PUMP 35 BBLS CEMENT WITH 15 PPB AGGREGATE. NO SQUEEZE. DROP BALL, CONTAMINATE AND CIRC DOWN TO 5600'. CHASE OUT OF HOLE. RIH TO 5875', NO TAG. INJECTIVITY = 0.3 BPM @ 400 PSI. STATIC PRESSURE = 250 PSI WITH 1% KCL. GAGE RUN WITH 3.624 NOZZLE TO 5250. NO PROBLEMS. FREEZE PROTECT WELL TO 2000' WITH MEOH. RDMO. NOTIFY OPERATOR TO LEAVE WELL SI. 11/17/01 MIRU DOCT #3. RUN 4-1/2" ClBP AND SET AT 5250' CTM. PT CIBP TO 1000 PSI (GOOD). RIH W/3" CEMENTING NOZZLE. TAG ClBP, CIRC IN SLK WTR F/REVERSING LATER. LAY-IN 6.5 BBLS 15.8 PPG CL "G" CEMENT ON ClBP. REVERSE CLEAN TBG TO 5040' CTM. FP WELL TO 2000' CTM WITH 60/40 MW. RDMO. **LEFT WELL SHUT-IN** 11/19/01 RAN 3.5 "SWAGE W/SAMPLE BAILER & TAG TOP OF CEMENT PLUG @ 5025' SLM. WELL LEFT SHUT-IN. 11/21/01 COMPLETED SCMT, NO CEMENT IN 4 1/2 X 9 5/8" ANNULUS FRM 5048' TO 4304', JET CUT TUBING AT 4525', PUNCHED 9 HOLE IN TBG FROM 2928'-2930'. 11/25/01 WELL FAILED TWO CMIT. PUMPED CIRC OUT AS DIRECTED WITH A 5 BBL 60/40 SPEAR FOLLOWED BY 280 BBLS OF SEAWATER HEATED TO 120' FOLLOWED BY 160 BBLS OF DIESEL HEATED TO 100°. U- TUBED WELL FOR ONE HOUR BEFORE SHUT IN. ., ~... Legal Well Name: 04-19A Common Well Name: 04-19A Spud Date: 11/25/200t Event Name: REENTER+COMPLETE Start: 11/25/2001 End: 12/22/2001 Contractor Name: NABORS Rig Release: 12/22/2001 Rig Name: NABORS 2ES Rig Number: 11/2712001 03:00 - 12:00 g.00 MOB P PRE REMOVE BELLY BOARD FROM DERRICK, PREP TO MOVE. 12:00 - 00:00 12.00 MOB P PRE MOVE RIG TO DS-04-1gA. 11128/2001 00:00 - 15:00 15.00 RIGU P PRE MOVE PITS AND CAMP TO DS-04-1gA LOCATION. SPOT SAME AND CONT. TO RU. ACCEPT RIG ON DAYWORK AT 1500 HRS, 11/28/01. 15:00 - 16:00 1.00 RIGU P PRE HOLD PRE-SPUD SAFETY MTG. 16:00 - 18:30 2.50 RIGU P PRE RU LINES FOR DIESEL DISPLACEMENT, TAKE ON SEA WATER. 18:30 - lg:30 1.00 RIGU P PRE RU DSM PULL BPV. PRESSURES: 9-5/8"X13-3/8" = 0 PSI, 7"X9-5/8" = 200 PSI, 7" TBG = 250 PSI. RD DSM. 19:30 - 20:30 1.00 RIGU P PRE RU THE TREE FOR DISPLACEMENT. 20:30 - 23:00 2.50; RIGU P PRE CLEAN RIG, COMPLETE RU OF LINES, CONT. TAKING ON SW. PJSM. 23:00 - 00:00 1.00 RIGU = PRE ATTEMPT TO DISPLACE FP. SHUT DOWN AND TIGHTEN LEAKING TREE FLANGE. 1112g/2001 00:00 - 02:30 2.50 RIGU = PRE CIRC OUT DIESEL FP PLUS ONE HOLE VOLUME AT 3 BPM, 390 PSI, THRU CHK. MONITOR WELL - OKAY. 02:30 - 03:00 0.50 RIGU P PRE BLOW DOWN LINES. CLEAN RIG FLOOR. 03:00 - 03:30 0.50 RIGU P PRE ATTEMPT TO SET TWC. WOULD NOT SET. 03:30 - 04:00 0.50 RIGU N SFAL PRE WAIT ON DSM LUBRICATOR. 04:00 - 05:00 1.00 RIGU N SFAL PRE RU LUBRICATOR, OPEN WELL AND FLOW CHECK. WELL HAD SLIGHT FLOW. SI PRESSURE 20-50 PSI. 05:00 - 08:30 3.50 RIGU N SFAL PRE WEIGHT UP SW WITH SALT, FROM 8.5 PPG TO 8.7 PPG. ClRC AT 3 BPM AND 270 PSI THRU CHK. SHUT DOWN AND MONITOR WELL. SMALL FLOW, SHUT IN WELL. 08:30 - 10:00 1.50 RIGU P PRE DISPLACE WELL W/PREPARED 9.7-9.8PPG BRINE, AT 3 BPM, 270 PSI, THRU CHK. SD, MONITOR WELL - DEAD. 10:00 - 11:00 1.00 RIGU P PRE INSTALL 'I'WC. TEST BELOW TO 500 PSI, ABOVE TO 2,000 PSI. RD DSM. 11:00 ~ 11:30 0.50 RIGU P PRE BLOW DOWN LINES, CLEAN RIG FLOOR. 11:30- 13:30 2.00 RIGU P PRE PJSM. ND TREE. 13:30 - 18:30 5.00 RIGU P PRE NU BOPS. 18:30 - 20:30 2.00 RIGU :~ PRE PJSM. PU AND SET TEST PLUG. RU TEST EQUIPMENT. 20:30 - 00:00 3.50 RIGU = PRE TEST BLIND RAMS, UPPER/LOWER PIPE RAMS, CHK MANIFOLD TO 250/4,000 PSI -OKAY. 11/30/2001 00:00 - 02:00 2.00 RIGU = PRE CONT. PRESSURE TESTING CHK MANIFOLD. TEST ANNULAR PREVENTER TO 250 / 3,500 PSI. TEST TIW AND DART TO 250 / 4,000 PSI - OKAY. RD TEST EQUIP. 02:00 - 03:00 1.00 RIGU P PRE RU DSM AND PULL TWC. WELL ON VACUMN. PUMPED 24 BBLS TO FILL. HOLE STAYING FULL. 03:00 - 04:00 1.00 PULL P DECOMP PU / MU SPEAR ASSEMBLY. 04:00 - 04:30 0.50 PULL P DECOMP BACK OUT LOCK DOWN SCREWS. 04:30 - 05:30 1.00 PULL P DECOMP PJSM PULL TBG FREE WITH 165k LBS. STRNG WT (ABOVE SEAL ASSEMBLY) = 117K IN BLOCKS. CIRC. ONE HOLE VOL. AT 5 BPM, 240 PSI. 05:30 - 07:30 2.00 PULL P DECOMP PULL TBG HNGR TO FLOOR. RU TBG HANDLING EQUIPMENT. RU CONTROL LINE SPOOLING UNIT. 07:30 - 13:00 5.50 PULL P DECOMP LD 7" 26 LB/FT TBG TO SSSV AT 2,226'. RECOVERED 28 OF 30 STEEL CONTROL LINE BANDS. 13:00- 13:30 0.50 PULL ~ DECOMP RD SPOOLING UNIT. 13:30 - 14:30 1.00 PULL :) DECOMP CONT. PULLING 7" TBG. TOTAL PULLED = 68JTS, 3 PUP , Printed: 12/26/2001 8:3g:41 AM Legal Well Name: 04-19A Common Well Name: 04-19A Spud Date: 11/25/2001 Event Name: REENTER+COMPLETE Start: 11/25/2001 End: 12/22/2001 Contractor Name: N^BORS Rig Release: 12/22/2001 Rig Name: NABORS 2ES Rig Number: 11/30/2001 13:30- 14:30 1.00 PULL P DECOMP JTS, 1 SSSV. 14:30 - 15:00 0.50 PULL P DECOMP RU FALSE FLOOR FOR PULLING SCAB LINER AND SEAL ASSEMBLY. 15:00 - 16:30 1.50 PULL P DECOMP LD SEAL ASSEMBLY, RD FALSE FLOOR. 16:30 - 19:00 2.50 PULL P DECOMP PULL AND LD 4-1/2", 15.1 LB/FT, STL TBG. RECOVERED 35 JTS PLUS CUTOFF. 19:00 - 20:00 1.00 PULL P DECOMP LD 4-1/2" TBG HANDLING EQUIP. LD SPEAR ASSEMBLY 20:00 - 20:30 0.50 PULL P DECOMP SET WB. 20:30- 21:30 1.00 PULL P DECOMP CLEAN RIG FLOOR, PU MILLING BHA#1 21:30 -00:00 2.50 PULL P DECOMP PJSM. MU BHA #1. PU 6-1/4" PCS. i12/1/2001 00:00 - 02:30 2.50 PULL P DECOMP CONT. PU DRILL COLLARS AND HWDP. 02:30 - 04:00 1.50 PULL I P DECOMP CUT AND SLIP 109' OF DRILL LINE. SERVICE TOP DRIVE. 04:00 - 06:00 2.00 PULL P DECOMP PU 4" DP AND RIH TO 2,992'. TAG TOP OF 9-5/8" PKR. 06:00 - 06:30 0.50 PULL P DECOMP OBTAIN DRILLING PARAMETERS. 115K UP, 115 DWN, 115K ROTATING. 06:30 - 08:00 1.50 PULL P DECOMP MILL 9-518" PKR W/10-15k WOB, 5-6,000 FT-LB. MILL 2,992-2,995'. MONITOR WELL - STABLE. 08:00 - 10:00 2.00 PULL P DECOMP CONT. RIH AND PICKING UP 4" DP. PUSHED PKR/CMPL ASSEMBLY TO 4,436'. 10:00 - 10:30 0.50 PULL P DECOMP CBU, MONITOR WELL - STABLE. 10:30 - 13:30 3.00 PULL :) DECOMP POOH TO BHA. 13:30 - 15:30 2.00 PULL 3 DECOMP POOH W/PKR MILLING BHA. LD MILLS, CLEAN JUNK BASKETS. CLEAR FLOOR. 15:30- 17:00 1.50 STWHIP :) WEXlT PU/MU BHA#2 17:00 - 21:30 4.50 STWHIP :~ WEXlT PU DP AND RIH TO 4,400'. 21:30 - 23:30 2.00 STWHIP P WEXlT POOH W/DP. 23:30 - 00:00 0.50 STWHIP P WEXlT LD STRING MILL, JARS. CLEAR FLOOR. 12/2/2001 00:00 - 01:30 1.50 STWHIP P WEXlT PJSM. RU WlRELINE TO RUN 9-518" EZSV. RIH, CORRELATE WI GR AND SET AT 3,886'. POOH AND RD WL. 01:30 - 04:30 3.001 STWHIP P WEXlT RIH, CORRELATE WI GR AND SET AT 3,886' WLM. POOH AND RD WL. 04:30 - 05:30 1.00 STWHIP P WEXlT RU AND TEST 9-5/8" CSG AND BP TO 4,000 PSI FOR 30 MIN. - OKAY. 05:30 - 07:00 1.50 STWHIP P WEXlT PU WHIPSTOCK ASSEMBLY AND ORIENT. 07:00 - 12:00 5.00 STWHIP P WEXlT RIH W/WHIPSTOCK BHA. PU 4" DP AND RIH TO 3,836'. 12:00 - 13:00 1.00 S'I'WHIP P WEXIT RU WL TO ORIENT WHIPSTOCK. 13:00 - 15:00 2.00 STWHIP P WEXlT RIH W/GYRO AND ORIENT WHIPSTOCK TO 351 PEG AZIMUTH. RD WL. PU ONE STAND, RIH AND TAG BP AT 3,876' DPM. SHEAR PINS AND SET WHIPSTOCK WITH 35K DOWN. 15:00 - 15:30 0.50 STWHIP P WEXlT PU AND CHECK SET. 15:30 - 16:30 1.00 STWHIP P WEXIT CLEAN OUT FREEZE PLUG IN G&I HARDLINE. 16:30 - 17:30 1.00 STWHIP P WEXlT DISPLACE WELLBORE WITH 9.8 PPG HT MUD, AT 6 BPM, 450 PSI. 17:30 - 21:30 4.00 STWHIP P WEXIT MILL WINDOW FROM 3,853' TO 3,869', PUMPING SWEEPS AS NEEDED. 21:30 - 23:30 2.00 STWHIP :) WEXIT DRILL TO 3,888' TO BURY MILLS. BACKREAM AND WORK MILLS THRU THE WINDOW. 23:30 - 00:00 0.50 STWHIP 3 WEXlT RU FOR FIT. PTSM, PJSM. 12/3/2001 00:00 - 01:00 1.00 DRILL :~ INT1 PTSM, PJSM. RU AND PERFORM FIT TO 12.5 PPG EMW W/9.7 PPG MUD IN HOLE. 01:00 - 02:00 1.00! DRILL P INT1 MONITOR WELL - OKAY. PUMP SLUG. BLOW DOWN TOP Printed: 12/26/2001 8:39:41 AM Legal Well Name: 04-19A Common Well Name: 04-19A Spud Date: 11/25/2001 Event Name: REENTER+COMPLETE Start: 11/25/2001 End: 12/22/2001 Contractor Name: N^BORS Rig Release: 12/22/2001 Rig Name: NABORS 2ES Rig Number: 12/3/2001 01:00- 02:00 1.00 DRILL P INT1 DRIVE. 02:00 - 04:00 2.00 DRILL P INT1 POOH TO HWDP. C/O ELEVATORS. 04:00 - 04:30 0.50 DRILL P INT1 POOH WI HWDP, AND STAND BACK. 04:30 - 08:00 3.50 DRILL P INT1 POOH AND LD WINDOW MILLING BHA. 08:00 - 09:00 1.00 DRILL P INT1 CLEAN METAL CU'I-rlNGS AND WASH DOWN STACK. PULL WB. 09:00- 10:00 1.00 DRILL P INT1 INSTALL WB. RUN IN LDS. 10:00 - 11:00 1.00 DRILL P INT1 CLEAR FLOOR. PU DRILLING BHA. C/O ELEVATORS. 11:00- 14:00 3.00 DRILL 3 INT1 PU/MU BHA. PTSM, PJSM. 14:00 - 16:30 2.50 DRILL 3 INT1 RIH, PICKING UP THE REMAINING 4" DP FOR REACHING TD. 16:30 - 17:30 1.001 DRILL P INT1 CONT. RIH TO 3,820'. 17:30 - 20:00 2.50 DRILL P INT1 RU ELECT. LINE AND GYRO. RU SIDEENTRY SUB AND RIH. 20:00 - 21:00 1.00 DRILL P INT1 ORIENT TOOLFACE, SLIDE THRU WINDOW - OKAY, 21:00 - 00:00 3.00 DP:iLL P INT1 ' ' bRILI.: BI:JiLD SECTION. 12/412001 00:00 - 01:00 1.00 DRILL P INT1 PTSM CONT. DRLG TO 4,007'. ~ 01:00 - 02:30 1.50 DRILL P INT1 POOH TO 3,820'. SURVEY/ORIENT W/GYRO. ~' 02:30 - 03:30 1.00 DRILL P INT1 POOH W/ E-LINE AND GYRO. RD/LD. ~ 03:30 - 04:00 0.50 DRILL P INT1 RIH TO BTM, ClRC. ~ 04:00 - 12:00 8.00 DRILL P INT1 DRILL W/1.5 DEG MOTOR, SURVEY W/M.~/D-GR/RES FROM 4,007' TO 4,381'. ~ 12:00 - 00:00 12.00 DRILL P INT1 PTSM DRILL TO 5,129'. ~ 12/5/2001 00:00 - 18:00 18.00 DRILL P INT1 PTSM, PJSM. DRILL TO 6,438' T~MD (THRU INJECTION ZONE). BIT WAS DRILLING~F.,RRATICALLY. RAN CENTRIFUGE TO REDUC~,E~v~W TO 9.8 PPG. 18:00 - 19:30 1.50 DRILL 3 INT1 CIRCULATE AND CO~BITION FOR TRIP. 19:30 - 20:00 0.50 DRILL P INT1 PULL 5 STANDS ~3 CHECK THE WELL FOR FLOW - 5 ' OKAY. ~ 20:00 - 21:30 1. 0 DRILL P INT1 PUMP SLU_/C.-~ND CONTINUE POOH FROM 5,970' TO 5,315'~PULL WITH EACH STD PULLED, FRO~f20-50K. 21:30 - 22:00 0.50 DRILL P INT1 C AND CONDITION HOLE. 22:00 - 23:00 1.00 DRILL P INT1 J CONT. POOH TO FIRST 5 STDS TO 4,854', PULLED SLICK. CONT. PULL W/INCREASING TIGHT HOLE TO 4,649', WITH OP 20-50K. 23:00 - 00:00 1.00 DRILL P~ 1NT1 CIRC. & CONDITION HOLE. 12/6/2001 00:00- 02:00 2.00 DRILL P ~ INT1 CONT. POOH. HOLE TIGHT, UNTIL 4,150'. PULL THRU WINDOW- OKAY. 02:00 - 04:00 2.00 DRILL P.J INT1 PJSM, CUT & SLIP 92' OF DL. ADJUST BRAKES. SERVICE TOP DRIVE. 04:00 - 04:30 0.50 DRIL~; INT1 PUMP SLUG, BLOW DOWN TD. 04:30 - 06:30 2.00 D~_L; INT1 POOH TO 741' - BHA. 06:30 - 08:00 1.5Q4~RILL INT1 C/O TO 5" ELEVATORS. POOH AND LD BHA. 08:00 - 09:30 ~ DRILL P INT1 DOWNLOAD MWD DATA. POOH TO BIT. 09:30- 10:30///1.00 DRILL N RREP INT1 REPAIR PIPE SKATE. 10:30 - 11:0.~' 0,50 DRILL P INT1 LD MWD AND MOTOR. 11:00 - 1.,~,d30 1.00 DRILL P INT1 SERVICE TOP DRIVE (CHANGE FILTERS, RESET HANDLERS AND EYE SENSOR). 1~O0- 15:00 3.00 DRILL P INT1 PTSM PU/MU BHA W/O RES. MU 1.22 DEG MOTOR. SURFACE TEST - OKAY. 15:00 ~ 16:30 1.50 DRILL P INT1 RIH TO 1,500'. ST - NO SIGNAL. CONT. IN HOLE TO 2,500'. ST - OKAY. Printed: 12r26/2001 8:39:41 AM Re: 4-19 Application for Sundry Approval to P&A: API~ 50-029-21791-0U Subject: Re: 4-19 Application for Sundry Approval to P&A: APl# 50-029-21791-00 Date: Thu, 15 Nov 2001 15:25:17 -0900 From: Tom Maunder <tom_maunder@admin.state.ak. us> ~,~_ (~)o~ L~ To: "Quay, Walter D (Fairweather)" <QuayWD@BP.com> CC: "Robertson, Brian B" <RobertBB@BP.com>, "Bunch, Anthony S" <bunchas@BP.com> Walter, et al, Per our discussion of what has been attempted so far to try to P&A 4-19, I am in agreement that I don't believe that you have any other options. Placing the mechanical plug as you describe with ~200' of cement on top will effectively isolate the lower portions of the wellbore. Further isolation above will be achieved with the retainer on which the whipstock will be set. By copy of the email you have approval to proceed as you have described. Tom Maunder, PE Sr. Petroleum Engineer AOGCC "Quay, Walter D (Fairweather)" wrote: > Tom, > As discussed in our telephone conversation this morning, I'm sending you > more information on the P&A of 4-19. I've added the summary of the well > work cement plug attempts along with 2 drawings the current well status and > proposed pre-rig) to the Word document that Brian sent to you last evening. > > <<4-19A Sundry ApplicationRl. ZIP>> > Please call me at either number listed below to discuss. > Walter Quay > quaywd@bp, com > (907)564-4178 > (907)440-8632- Cell > Name: 4-19A Sundry ApplicationR1.ZIP > 4-19A Sundry ApplicationR1.ZIP Type: Zip Compressed Data (application/x-zip-compressed) > Encoding: base64 Tom Maunder <tom maunder@admin.state.ak, us> Sr. Petroleum Engineer Alaska Oil and Gas Conservation Commission I of 1 11/20/01 6:53 AM bp BP Exploration Alaska To: From: Subject: Reference: Tom Maunder - AOGCC Date: Walter Quay DS 4-19A Application for Sundry Approval - P&A for Sidetrack Operations APl # 50-029-21791-00 October 13, 2001 Approval is requested for the proposed P&A of 4-19 well. The 4-19 wellbore was drilled in 1988 as a dedicated Cretaceous disposal well. The well had a history of problems isolating injection into the desired interval and was eventually shut-in after a broach to surface in March of 1997. The well is no longer useable for Cretaceous disposal purposes, and is planned for a rig sidetrack to a Sadlerochit target. The 4-19A sidetrack is planned as an up-dip water injector for the 'Up-Dip Victor Wag Project' and will be used as a guard well to push out and block gas cap gas from migrating back into the EOR area. The new wellbore is proposed as a conventional sidetrack, and the targeted bottom hole location will position the well in line with two existing up-dip Victor injection wells, 11-35 and 4-49. The sidetrack is currently scheduled for Nabors 2ES beginning around November 27st, after completion of the K-05B Sidetrack. The pre-rig work for this sidetrack is planned to begin as soon as the attached Application for Sundry is approved. Scope Pre-Ria Work: * Notify the field AOGCC representative with intent to re-enter the well * 1. RU CTU and set bridge plug +/-5250' in 4.5" tubing. Place 200' of 15.8ppg class 'G' Cement on top of the bridge plug. 2. Rig up slickline, tag and document top of cement and drift tubing for upcoming tubing cut. 3. Test the integrity of the cement plug and 9-5/8' casing by simultaneously pressure testing both the tubing and 9-5/8" annulus to 3500 psi for 30 minutes. 4. Rig up E-line. Run CMT cement evaluation log into 4%" scab liner to determine top of cement behind the liner. Log from ~5000' MD to ~500' above the TOC, as determined by the logging tool. Calculated TOC based upon volumes pumped is -4700' MD. If the log shows any signs of cement behind the liner which is expected to interfere with the planned tubing cut at -4250' MD, contact the project Drilling Engineer to discuss options. Otherwise, cut the 4%" L-80 tubing at ~4250' MD (cut tubing in the center of full joint). This cut will not be fished, so the use of a jet or chemical cutter is at the discretion of the Wells Group Representative. Perforate the 7" tubing at ~2900' MD, immediately above the 4-1/2" scab liner. Design the tubing punch to perforate the 7" tubing, without damage to the 9-5~8" casing. 5. Displace the well to clean seawater by circulating down tubing through the perforations above the packer. Continue to circulate until clean seawater returns to surface. Freeze protect top 2200' MD with diesel. 6. Test the FMC 9-5/8" mandrel packoff and tubing hanger seals to 5000 psi for 30 minutes. 7. Set a BPV in the tubing hanger. Secure well. Remove the well house and flowlines. If necessary, level the pad. Please provide total well preparation cost on the handover form. 4-19A Application for Sundry Rie 1. 2. 3. 4. Operations: MIRU Nabors 2ES. Circulate out freeze protection and displace well to seawater. Set TWC & test from below. Nipple down tree. Nipple up and test BOPE to 250 / 3500 psi. PU on 7" tubing and pull the seal assembly from the seal bore below 9-5/8" packer. Pull and lay down 7" tubing and 4-1/2' scab liner from E-line cut and above. 5. MU 9-5/8" packer milling assembly. RIH and mill 9-5/8" 'FB-I' permanent packer and push packer and remainder of tailpipe assembly to top of tubing stub. POOH. 6. RU E-line and set BP at ~3894' MD (set as needed to avoid cutting casing collar). Test 9-5/8" casing to 3500 psi for 30 minutes. 7. RIH with 9-5/8" Baker bottom-trip anchor whipstock assembly. Orient whipstock and set on BP. Mill window in 9-5/8" casing at ~3870' MD. Prior to POH, perform FIT to 12.5 ppg EMW. 8. RIH with 8W' drilling assembly (with MWD/GR) to whipstock. Kick-off and drill the 8-1/2" intermediate section to Top Sadlerochit Zone 4 @ +9001' MD (8506' TVD). 9. Run and cement 7", 26# intermediate drilling liner to ~150' back into window. POH. 10. Make up and RIH with a 6-1/8" directional assembly (with MWD/GR/RES/DEN/NEU) to the 7" liner landing collar. 11. Test the 9-5/8" casing and 7" liner from the landing collar to surface to 3500 psi for 30 minutes. 12. Drill shoe track and 20' of new formation. Conduct FIT to 9.5 ppg EMW. 13. Drill 6-1/8" production section as per directional plan to an estimated TD of 9463' MD (8910' TVD). 14. Run and cement a 4~", 12.6# L-80 solid production liner throughout the 6-1/8" wellbore. Displace well to clean seawater above liner top. POOH LD DP. 15. Test the 4~", 7", and 9-5/8" casing from the 4-1/2" landing collar to surface to 3500 psi for 30 min. 16. RU e-line unit and run CBT to evaluate cement behind 7" casing (AOGCC regulations for injection well classification). 17. Run a 4W' x 5~" x 7" L-80 completion tying into the 4-1/2" liner top. 18. Set packer and test the tubing to 3500 psi and annulus to 3500 psi for 30 minutes. 19. Nipple down the BOPE. Nipple up and test the tree to 5000 psi. 20. Freeze protect the well to ~2200' and secure the well. 21. Rig down and move off. Post-Ria Work: 1. MIRU slickline. Pull the ball and rod / RHC plug from 'X' nipple below the production packer. 2. Perforate approximately 75' of Zone 2 & 3 with E-line conveyed guns. Estimated Pre-rig Start Date: 11/01/01 Estimated Spud Date: 11/27/01 Walter Quay Operations Drilling Engineer 564-4178 4-19A Application for Sundry Well Work Summary 11/12 CONTINUED FROM PREVIOUS WSR. PUMP 25 BBLS 15.8 PPG CEMENT {3 NEAT, 19 WITH 15 PPB AGGREGATE, 3 NEAT) UNABLE TO BUILD SQUEEZE PRESSURE. RIH AND CONTAMINATE TO TT. PUH TO 4000', WAIT ON MORE CEMENT. MIX AND PUMP 35 BBLS CEMENT WITH 15 PPB AGGREGATE. NO SQUEEZE. DROP BALL, CONTAMINATE AND CIRC DOWN TO 5600'. CHASE OUT OF HOLE. RIH TO 5875', NO TAG. INJECTIVITY = 0.3 BPM @ 400 PSI. STATIC PRESSURE = 250 PSI WITH 1% KCL. GAGE RUN WITH 3.624 NOZZLE TO 5250. NO PROBLEMS. FREEZE PROTECT WELL TO 2000' WITH MEOH. RDMO. NOTIFY OPERATOR TO LEAVE WELL SI. [Plug-Abandon Perfs] 11/11 MIRU DS CTU #3. PU 2.25" BDN. RIH. KILL WELL WITH 1% KCL (NS). MIX AND PUMP 25 BBLS CLASS G CEMENT WITH AGGREGATE IN 19 BBLS MIXED AT 10 LBS/BBL. UNABLE TO BUILD SQUEEZE PRESSURE. (25 BBLS BEHIND PIPE). CONTAMINATE AND PREP FOR REZQUEEZE. JOB IN PROGRESS. [Plug-Abandon Perfs] 11/09 DRIFTED TUBING TO 5945' CORR WITH A 2.5" CENTRALIZER - BACK WITH SAMPLE OF INJECTOR SLURRY WELL LEFT SHUT IN. 4-19A Application for Sundry 04-19 Current Status II DATE- I REV BY I COMf'C~NTS DATE REV B'f' COMMIS~FS 4.19A Ap¢ication for Sundry 5620-5625 5950 5968 5952~59P4 5990-6020 60726080 4250' 200' Cement Above BP Bridge Plug @ 5250' 4-119A APP![Caflon for Sundry STATE OF ALASKA ALASN,,..~IL AND GAS CONSERVATION COM,.~SION APPLICATION FOR SUNDRY APPROVAL 1. Type of Request: [] Abandon [] Suspend [] Plugging [] Time Extension [] Perforate [] Alter Casing [] Repair Well [] Pull Tubing [] Variance [] Other [] Change Approved Program [] Operation Shutdown [] Re-Enter Suspended Well [] Stimulate Plug Back for Sidetrack 2. Name of Operator BP Exploration (Alaska) Inc. 3. Address P.O. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 912' NSL, 254' EWL, SEC. 26, T11 N, R15E, UM At top of productive interval 912' NSL, 254' EWL, SEC. 26, T11N, R15E, UM At effective depth 904' NSL, 248' EWL, SEC. 26, T11N, R15E, UM At total depth 903' NSL, 248' EWL, SEC. 26, T11N, R15E, UM 5. Type of well: r'l Development [] Exploratory [] Stratigraphic [] Service 6. Datum Elevation (DF or KB) RKB = 60' 7. Unit or Property Name Prudhoe Bay Unit 8. Well Number 04-19i 9. Permit Number 188-024 ~ 10. APl Number V/' 50- 029-21791-00 11. Field and Pool Prudhoe Bay Field / Prudhoe Bay Pool 12. Casing Present well condition summary ,/ Total depth: measured 7000 feet Plugs (measured) true vertical 7000 feet ~'' Effective depth: measured 6992 feet Junk (measured) See Diagram true vertical 6992 feet Length Size Cemented M D TVD Structural Conductor 115' 20" 2150# Poleset 115' 115' Surface 2984 13-3/8" 2500 sx CS III, 600 sx CS II 2984' 2984' Intermediate Production 6993' 9-5/8" 1350 sx Class 'G', 300 sx CS I 6993' 6993' Liner Scab Liner 2946' 5" x 4-1/2" 65 Bbls Class 'G' 2947' - 5893' 2947' - 5893' Perforation depth: measured Open: 5930'- 6883' RECEIVED Sqzd: 5617' - 5625' true vertical Open: 5930'-6883' OCT 1 ~[ ~001 Sqzd: 5617' - 5625' Tubing (size, grade, and measured depth) 7", 26#, L-80 to 2993'; 5-1/2", 17#, L-80 to 3004' Alaska0il & Gas Cons. Commission Anchorage Packers and SSSV (type and measured depth) Baker FB-1 packer at 3004'; Baker FAB 85-47 packer at 2936'; Camco BaI-O SSSV Nipple at 2210' 13. Attachments [] Description Summary of Proposal 4. Estimated date for commencing operation October 19, 2001 16. If proposal was verbally approved Name of approver Date Approved Contact Engineer Name/Number: Walter Quay, 564-4178 15. [] Detailed Operations Program [] BOP Sketch Status of well classifications as: [] Oil [] Gas [] Suspended Service Cretaceous Disposal Well Prepared By Name/Number: Terrie Hubble, 564-4628 Signed Brian Robertson Title Senior Drilling Engineer ~ : com~issionus~e 0hlY ..-~ :: , ' , i~: i::i'> :, h':~ '"i :: }i;~i~',' ~:;, q;:: ,' :, :~; i'F; Conditions of Approval: Notify Commission so representative may witness '~, SOi~ ~>,,~t ~"~-~t~-t~ Plug integrity ~(, BOP Test "~ Location clearance __ Mechanical Integrity Test __ Subsequent form required 10- t"[(~)t"~ Approved by order of the Commission Original Signed By Form 10-403 Rev. 06/15/88 Date Approval No. [~)C~,J. -~2~q q Commissioner .ate/~?,~ ~, Submit I~TripliCate' RDiII BP II ae~rl BBII I III1~ II, W~I I~ BP Exploration Alaska To: From: Subject: Reference: Tom Maunder - AOGCC Date: October 11, 2001 Walter Quay DS 4-19A Application for Sundry Approval - P&A for Sidetrack Operations APl # 50-029-21791-00 Approval is requested for the proposed P&A of 4-19 well. The 4-19 wellbore was drilled in 1988 as a dedicated Cretaceous disposal well. The well had a history of problems isolating injection into the desired interval and was eventually shut-in after a broach to surface in March of 1997. The well is no longer useable for Cretaceous disposal purposes, and is planned for a rig sidetrack to a Sadlerochit target. The 4-19A sidetrack is planned as an up-dip water injector for the 'Up-Dip Victor Wag Project' and will be used as a guard well to push out and block gas cap gas from migrating back into the EOR area. The new wellbore is proposed as a conventional sidetrack, and the targeted bottom hole location will position the well in line with two existing up-dip Victor injection wells, 11-35 and 4-49. The sidetrack is currently scheduled for Nabors 2ES beginning around November 21st, after completion of the K-05B Sidetrack. The pre-rig work for this sidetrack is planned to begin as soon as the attached Application for Sundry is approved. Scope Pre-Rig Work: * Notify the field AOGCC representative with intent to re-enter the well * 1. RIH with CTU to top of fill in 9-5/8" casing and perform a cement P&A using 15.8 ppg class 'G' cement. Use adequate cement volume to fill the 9-5/8" casing from top of fill, extending the cement plug up into the tubing tail a minimum of 100', plus squeeze 5 bbls to the perforations. 2. Rig up slickline, tag and document top of cement and drift tubing for upcoming tubing cut. 3. Test the integrity of the cement plug and 9-5/8" casing by simultaneously pressure testing both the tubing and 9-5/8" annulus to 3500 psi for 30 minutes. 4. Rig up E-line. Run CMT cement evaluation log into 4Y2" scab liner to determine top of cement behind the liner. Log from -5350' MD to -500' above the TOC, as determined by the logging tool. Calculated TOC based upon volumes pumped is -4700' MD. If the log shows any signs of cement behind the liner which is expected to interfere with the planned tubing cut at -4525' MD, contact the project Drilling Engineer to discuss options. Otherwise, cut the 4~" L-80 tubing at -4525' MD (cut tubing in the center of full joint). This cut will not be fished, so the use of a jet or chemical cutter is at the discretion of the Wells Group Representative. Perforate the 7" tubing at -2900' MD, immediately above the 4-1/2" scab liner. Design the tubing punch to perforate the 7" tubing, without damage to the 9-5/8" casing. 5. Displace the well to clean seawater by circulating down tubing through the perforations above the packer. Continue to circulate until clean seawater returns to surface. Freeze protect top 2200' MD with diesel. 6. Test the FMC 9-5/8" mandrel packoff and tubing hanger seals to 5000 psi for 30 minutes. 4-19A Application for Sundry 7. Set a BPV in the tubing hanger. Secure well. Remove the well house and flowlines. If necessary, level the pad. Please provide total well preparation cost on the handover form. Ri.q 1. 2. 3. 4. Operations: MIRU Nabors 7ES. Circulate out freeze protection and displace well to seawater. Set TWC & test from below. Nipple down tree. Nipple up and test BOPE to 250 / 3500 psi. PU on 7" tubing and pull the seal assembly from the seal bore below 9-5/8" packer. Pull and lay down 7" tubing and 4-1/2" scab liner from E-line cut and above. 5. MU 9-5/8" packer milling assembly. RIH and mill 9-5/8" 'FB-I' permanent packer and push packer and remainder of tailpipe assembly to top of tubing stub. POOH. 6. RU E-line and set BP at -4424' MD (set as needed to avoid cutting casing collar). Test 9-5/8" casing to 3500 psi for 30 minutes. 7. RIH with 9-5/8" Baker bottom-trip anchor whipstock assembly. Orient whipstock and set on BP. Mill window in 9-5/8" casing at -4400' MD. Prior to POH, perform FIT to 12.5 ppg EMW. 8. RIH with 81/2" drilling assembly (with MWD/GR) to whipstock. Kick-off and drill the 8-1/2" intermediate section to Top Sadlerochit Zone 4 @ _+9001' MD (8506' TVD). 9. RU WI and run logs(from 5000' - 6000' TVD) to evaluate the cuttings injection zone. 10. Run and cement 7", 26# intermediate drilling liner to -150' back into window. POH. 11. Make up and RIH with a 6-1/8" directional assembly (with MWD/GR/RES/DEN/NEU) to the 7" liner landing collar. 12. Test the 9-5/8" casing and 7" liner from the landing collar to surface to 3500 psi for 30 minutes. 13. Drill shoe track and 20' of new formation. Conduct FIT to 9.5 ppg EMW. 14. Drill 6-1/8" production section as per directional plan to an estimated TD of 9463' MD (8910' TVD). 15. Run and cement a 41/2'', 12.6# L-80 solid production liner throughout the 6-1/8" wellbore. Displace well to clean seawater above liner top. POOH LD DP. 16. Test the 41/2", 7", and 9-5/8" casing from the 4-1/2" landing collar to surface to 3500 psi for 30 min. 17. RU e-line unit and run CBT to evaluate cement behind 7" casing (AOGCC regulations for injection well classification). 18. Run a 41/2" x 5Y2" x 7" L-80 completion tying into the 4-1/2" liner top. 19. Set packer and test the tubing to 3500 psi and annulus to 3500 psi for 30 minutes. 20. Nipple down the BOPE. Nipple up and test the tree to 5000 psi. 21. Freeze protect the well to -2200' and secure the well. 22. Rig down and move off. Post-Riq Work: 1. MIRU slickline. Pull the ball and rod / RHC plug from 'X' nipple below the production packer. 2. Perforate approximately 75' of Zone 2 & 3 with E-line conveyed guns. Estimated Pre-rig Start Date: Estimated Spud Date: 11/01/01 11/20/01 Walter Quay Operations Drilling Engineer 564-4178 4-19A Application for Sundry WELL~*EAD= FMC ( \ CTUATOR= BAKER E KB. ELBA/= 60 BF. ELEV = KQP= 2 @ 2449 2947' 2955' 2971' 2984' 2993' 2993' 7" TBG-PC, 26#, L-80, 0.0383 bpf, ID = 6.276" TOPOF 5-1/2" TBG*PC Minimum ID = 3.00" @ 5719' 4-1/2 HES RN NIPPLE PROTECTIVE SLV PERFORATION SUMMARY REF LOG: BHCS 04106188 ANGLE AT TOP PEP, F: 4 @ 5617' Note: Refer to Production DB for historical perf data SIZE i SPF INTERVAL Opn/Sqz DATE 2-1/8' 4 5617-5625 S 6/12/1996 3-3/8' 6 5620-5625 S 2/17/1995 4" 05 5930-5950 O 9/3/1989 4 0.5 5962~5984 O 9/3/1989 4 0.5 5990*6020 O 9/3/1989 4 05 6072-6080 O i 9/3/1989 4 0.5 6100-6t38 O 9/3/1989 4 0.5 6155-6172 O 9/3/1989 4 05 6246-6366 O 5/31/1989 4 4 6394-6404 O 3/31/1989 4 4 6366-6388 O 3/31/1989 4 4 6394-6404 O 3/31/1989 4 4 6434-6454 O 3/31/1989 4 4 6455-6485 O 5/15/t988 4 4 6563-6603 O 5/15/1988 4 4 6799-6843 O 5/15/'1988 4 4 6869-6883 O 5/15/1988 TOP 5-1/2 "TBG-PC, 17#, L-80, 0.0232 bpf, ID = 4,892" 5529' 9-5/8" CSG. 47#, L-80, ~D = 8681" 6992' 7ooo' I t Status TROUBLED~ FHLFFM/PRRS HAVE REDUCED TEST PRESSURE PRESSURE LIMITS IN SOME CASES, CONTACT ACE (x5102) PRIOR TO PRESSURE TESTING, INJECTOR WELL 2210' 7" CAM BAL*O SSSV NIP, ID = 5.937" I 2936' ]--[7" BKR FAB 85-47 PKR/SEAL ASSY, ID = 4.00" 2947' ]-17" X 5" HMC LNR HGR, ID = 4.438" 2954' 1-15"X4-1/2"XO, ID=4,00"1 2955' I--~4-1/2" BKR MODEL E EXPANSION I ! JOINT (8' STROKE), ID = 3875" 2993' 7"x 5-1/2" XO (BE}41ND SCAB LNR) ] 3003" I-1 5~1/2" BKR SEAL ASSY(BEHIND SCAB LINER) 3004' I--~ 9-5/8"x 7" BKR FB-1 PKR(BEHIND SCAB LNR) NOTE: 51-/2" TBG TAILPIPE FELL OFF @ 3012' 5050' ]-17" X 5-1/2" XO, W/MILLOUT EXT, ORIG I / SET @ 3012' (BEHIND SCAB LNR) 5605' _J"~5-1/2" OTIS XN NIP- ORG, SET @ 3098' [ (BEHIND SCAB LNR), ID = 4.75" 5616' _Jd5-1/2" BKRSHEAROUT SUB-ORG [ SET @ 3109' (BEHIND SCAB LINER) 5617' ]--[5-1/2" TUBING TAIL - BEH SCAB LNR 6627' 5719' 1~_4-1/2"HES RN NIP, ID = 3.456" 5719' ]-t PROTECTIVE SLY (SET 12/13/96), ID = 300" 5893' 1--[4-tI2''FL°ATSN°E 1 5904' ]-1ELMDTT- LOGGB:) 12/01/96 6598' I-1 (WLM) FAILED IBP (LOST 03/I0/95) I 6995' I-1 TS&-100L 125"WIRE (LOST 12/19/96) I 02/07/981 I LAST WORKOV ER 2/27/00 SIS-SLT CONVERTED TO CANVAS 01/05/01 SIS-MD FINAL 3/30/01 RIWC~ CORRECTIONS DATE REV BY COMMENTS PRUDHQE BAY UNIT WELL: 04-19 PERMIT No; 88-024 APl No: 50-029-21791-00 SEC 26 T11N R15E 5029,5 FEL 437545 FNL BP Exple[ation (Alaska) TREE = CIW MET FMOG ,J 84-19 posed Pre-Rig ~t~T(~R= BAK~C ~, FHL~ ~RS ~V E R~UC~ ~ST ~B.~ ~ 60' mESSURE mESSURE LtM~S IN SOME CASES. CO~A CT ACE (x5102) ~lOR TO ~SS URE D;(d~O= 8800, ss ~O --- ~ 2210' ~ 2936' ]~7" BKR FAB 85-47 m~S~L ASSY, ID= 4,00" ITOP OF 5" LNR - SCAB I~ 2947' I ---~ 2947' Id7"X5"HMCLNRHOR, ID=4.438"I I5"LNR-SCAB, 15¢,.018ebpf, ID = 4.408" Id 2955' ~_~-_ 2954' IdS"X4-1/2"XO, IO=4.00"] 4-1/2" SCAB LNR, 151flST,, d 2971' ~ ! -- -- ~ 295S' Id4-1/2"8~RMOB~e~PANS'O~ ] 00142 bpf, ID = 3826" i / JOl~ (8 STROKE), ID = 3.875" [13-3/8"~G, 72¢,L-80,1D=12.347"~ 2984' ¢ ,~,bpf,~.-- -- ; ' , 2993' ]~7"x5-1/2"XO(B.INDSCABLNR) ] 7" ~e-~, 26¢, L-80.0,0383 ID = 6.276" ]~ 2993' IT°~°F5'~/z'me-~ I~ 2993' i ~ 3003' 1~5-1/2"BKRS~LASSY(BmlNDSCABLIN~ MinimumlD = 3.00" 5719' ~ 3004' 1~9-5/8"x 7" BKR FB-1 mR (B~IND SCAB LNR T kin Cut 4525' R~ LOG: BIq~ 04~06~88 I ,~ ~ / -u~,nu No~e: R~eF lo ~oducgon DB foF h~stodc~l peFf d~l~ NOTE: 5-i/2" TBG TAtLP~PE S~E S~ I~VAL Opn/Sqz DATE FELL OFF ~ 30i2~ 2-1/8" 4 5617-5625 S 6/12/1996 4" 0,5 5~30-5~50 O 0/3/1 ~8~ ~ S~ ~ 30~2~ (B~I~D SCAB k~R) ] 4 05 6072~6080 O 9/3/1989 4 0.5 6100~6138 O 9/3/1989 4 05 6155-6172 O 9/3/1989 F 4 05 6246-6366 O 5/31/1989 L 5605' j~ 5-1/2" OTIS XN N,P- ORG S~ ~ 3098' 4 4 6394-6404 O 3/31/1989 ~ ~ (B~IND SCAB LNR}, ID = 475" ~ 4 4 6366-6388 O 3/31/1989 ~ 5616' ]15-1/2"BKRS~ROUTSUB-ORG ' 4 4 6394-6404 O 3/31/1989 ~09 (B~IND SCAB 4 4 6434-6454 O 3/31/1989 4 4 6455-6485 O 5/15/1988 ; 4 4 6563~6603O 5/15/1988~ ~ ~ ~_:'~ ~1~~5617',.td5-1/2" ~BING TA'L- B~ SCAB LNR(S~ 3/96), I , 4 4 6799-6843 O 5/15/1988 ;8¢~ ¢;~,~**~ ! 4 6869-6883 O 5 15/1988 ' *'; ~ 5719' TOP5-1/2 TBG-~,17ff, L-80,00232bpf, ID=4892 I ¢ '~'~ , ~~ 5893' z 6598' ~(WLM)FAIL~BP(LOST03/lO/95) I [9-5/8"CSG, 47¢,L-g0,1D=8681" 1~ 6992' ~ ~~ ~ 6995' Id TS&-,OO'.125"W,RE (hOST ~ 2n 9/96)I 01/05/01 SiS-MDMD FI~L ARNo: 50-029-21791-00 03/30/01 R~C~ COR~C~ONS SEC 26 TllN R15E 50295 F~ 4375.45 FNL BP ~p[oration (Alaska) DATE REV BY COMMENTS DATE REV BY COMMENTS 02/07/98 LA ST WORKOV ER 12/27/00 SIS-SLT CONVERTEDTO CANVAS 01/05/01 StS-MD FINAL 03/30/01 RN/CW1T CORRECTIONS Window Milled from Whipstock Tel Bridge Plug set at +/-4 Pre-Rig Tubing Cut at +/-4,550 Perforations from 5617' 1o 6882' 9-5/8", 47 #lit, LB0, BTC ~ Date Rev By 6/20/01 WSI 4-19A Proposed ComPletion Cellar Box Elevation = 22.7' Nabers79ES RKB = 52.7' R LandngNppew h5.963 sea bore. 7", 26 #lit, L-80, BTC-Mod Tubing 4-1/2" Gas Lift Mandrels with handling pups installed. GAS LIFT MANDRELS ¢/ TVD Size Valve Type t TBD 1" RP Shear 4-I/2" x 7" crossover above 7" liner top BAKER 7"x 9 5/8" Liner Tie Back S~eeve ZXP Liner Top Packer 'Flex Lock' Hydraulic Liner Harl(~er 4-1/2" 12.6/i L-80, BTC-Mod Tubing 7'rx 4 1 /2" Baker'S 3' Production Packer 7", 26 #Iff, L-80, BTC-Mod ~ +/-8740' ] BAKER 5"x T' Proposed Completion Plug Back Depth 4-1/2" 12.6 #/it, L-80, BTC-Mod Comments PRUDHOE BAY UNIT WELL: 4-19A APl NO: 50-029-21791-01 BP Alaska Drilling& Wel s MEMORANDUM ALASKA OIL AND GAS CONSERVATION COMMISSION TO' David Johnston M~ry Robert Christenson State of Alaska Date: 8April97 Add 5/16/97, 6/12/97 Analysis sec. 7/21/97 File: rpt-ds4.doc Frm' Blair Wondzell ~ Water to Surface, PBU DS-4 Sub: Water-to-Surface, PBU DS-4, 3/97 PTD 88-024 In the early afternoon of Monday, March. 1 7, 1 997 Dave Hanson, ARCO, called and reported that there was a water flow(later found to be diluted sea water) on drill site 4, EOA, PBU. He reported that at about noon water started coming up around 6 wellheads - no hydrocarbons; adjacent wells were shut-in; area bermed; fluids flowing into reserve pit; seeping 10 to 20 BPM. On Tuesday, March 18, Mark Majors, Mike Bill, and Willie Friar briefed the commission. They said that at 10 AM the flow rate was 5 BPM; the water was coming out of 4-17 wellhouse and up around wells but also thru the pad between wells. Well 4-1 7(PTD 86-020) injects sea water for enhanced recovery while 4-1 9(PTD 88-024) is a slurry disposal well for the grind and inject plant. Analysis and Discussion Source well. Because the water flow was sea water and there are only two sea water injection wells on the pad, it is probable that the source of the water flow is one of the two wells (one is the grind and inject well #4-1 9, the other is a Sadlerochit enhanced recovery well #4-17). Samples of the recovered water did not contain barite, therefore it is probably not grind and inject slurry. Because it is the shallowest well and had has had channeling problems, 4-1 9 is considered to be the "most likely" source of the surfaced water. Investigations. ARCO has conducted extensive temperature and water flow logging (pulsed neutron log "PNL" to detect boron in borax added to test injection water) in wells 4-1 9 and 4-1 7 without obtaining any meaningful information. They also injected a 1750 bbls slug of water into 4-19 and did not obtain any indication of flow at the surface. They are contemplating injecting a large slug (-65,000 bbls) of borax water to try and pick up flow- thru-a-channel behind a nearby well and possibly flow to the surface. The risk of the large slug is that they may find out nothing or they may get another 20,000 bbls of water to the surface. Water to Surface, PBU DS-4 March 17, 1997 Page 2 Cement Quality Logs. A CBT run 4/9/88 indicates no cement bonding. A CET run on 4/9/88 indicates extremely poor bonding to no bonding - "no bonding" is indicated above the DV collar at --4487'. Dewayne Schnorr, Schulumberger, after reviewing the logs, said the CBT and CET shouwed no cement bonding of the 9-5/8" casing, he said because the minimum compressive strength shown on the CET is about 100 psi, it is probably mud. Step Rate Tests: We - Jack & I - evaluated DS 4-19 step rate tests dated 3/95, 11/95, & 12/96: the 3/95 tests showed an R vs P breakdown at a - 3600 psi; the 11/95 tests showed a normal R vs P increase (1 to 18 bpm); the 12/96 tests showed a rapid pressure build up, then a breakdown; @ P=3800 psi, R-5 bpm; @ P-3900 psi, R-20 bpm - a good pipe line. Perfs Covered With Fill. In well 4-1 9, fill was tagged at 5628' on 5/31/96, @ 5615' on 9/14/96; & 5634' on 10/8/96; fill was not cleaned out between those tags. All disposal perforations were covered with fill, only the squeeze perfs were uncovered (5622-27'). Covering the disposal perfs with fill probably caused the squeeze perfs to break down. Flow Path to Surface. The are four obvious routes by which injected fluids could reach the surface, they are: 1. Flow path from the injection perfs up a channel outside the casing to the surface. This is a good possibility because there are channels behind the casing, tho the flow path could be a combination of this plus horizontal flow to another well and then up the outside of the casing of the "other well" as in #2 below. 2. Flow from the injection perfs horizontally to another well, then up a channel outside the casing of the "other well" to the surface. This is a very reasonable possibility, especially in combination with #1 above. 3. Flow from the perfs into the formation to a fault, then up the fault to the surface. The ARCO engineers said they discussed this possibility with their seismic people who say there are no indications of faulting near well 4-1 9. 4. Flow from the perfs fracturing the formations and the shale confining zones to the surface. This is not a very reasonable possibility because there are over 449' of major confining zones, extending over a 1 600' interval above the upper-most perfs in 4-1 9. Casinq Deformation Analysis 4-19. Bob Crandal has analyzed the ovalalities indicated on the various USIT log runs- 1994, 95, & 96. See attached "PBU 4-19 USIT Log Review". Deformations occur between 6500' and 4390'. While this study may lead to a better understanding of downhole forces that Water to Surface, PBU DS-4 March 17, 1997 Page 3 affect casing strings, we do not expect it to assist in an understanding of the flow route from the injection perfs to the surface. Practical Considerations. Disposal into well 4-19 thru January 1 997 has been 48,778,070 barrels. Other than Prudhoe Bay, very few wells have had disposal of this magnitude (there have been 8 Prudhoe Bay wells with higher disposal volumes, the highest being PWDWl-1 @ over 140,000,000 barrels). Well 4-19 has been a good disposal well, if disposal had ended at 48 million barrels, there would have been no problems. MIT Failure, Well 4-20. We believe that the MIT failure in well 4-20 does not have any connection with the flow-to-surface on DS-4. Future Plans. ARCO stated in the 4/3/97 meeting that if they decided on grind and inject as the means of getting rid of drill cuttings (they are also considering surface burial in a large diameter hole), they would go to the Servco pad and drill a disposal well which would be separated from other wells by over 3,000' at the surface and over 2000' downhole. A fully cemented well separated from other wells by these distances should preclude injected fluids from reaching the surface thru channels adjacent to the weilbore or thru channels adjacent to wellbores in nearby wells. Recommendations: 1. The Commission should evaluate the adequacy of the surface casing cement jobs of those wells that are within -2,000' of the 4-1 9 disposal interval. Done 5/15/97 - of 21 cmt'g records reviewed for results (eg: returns, cement returns, etc.), 7 indicated good cement, 10 poor, and the remaining 4 somewhere in between: see "ds4sfcsg.xls". DS 4-20 should have had a top job, but none was indicated; I asked Doug to check the wellhead (5/15/97). Doug checked (report attached) on 5/16 and found the well head leaning an estimated 3 deg, it was not swaying; ARCO had no record of well head problems with this well. ARCO's Analysis, (Incident Report) based on cementing operation parameters (eg; type of cement, Centralization, Pipe movement, Displacement Rate, and Bumped Plug) qualified "GOOD CEMENT JOB" on the same 21 wells and indicated Yes - 8, Most Likely - 1, Probably - 4, and Maybe - 8. I consider ARCO's parameter meaningless. 2. We believe that "grind & inject" Will be the disposal method of choice for drill cuttings. Water to Surface, PBU DS-4 March 17, 1997 Page 4 3. ARCO's plan to drill and fully cement an isolated grind & inject disposal well should correct most of the problems that contributed to the flow to surface at DS-4. 4. The Commission should not encourage a long term injectivity test of 4-1 9, however, if the operator decides to conduct such a test, the Commission should not stop them. 5. The situation at BPX's grind & inject well "CC-2A" should be carefully analyzed and evaluated to determine if the Commission should impose additional requirements. Done 4/23/97 - BPX grind & inject well CC-2A has cum. disposal of 8.6 million bbls (vs 48.8 million for 4-19). The well was spudded 3/28/90 and completed 4/3/90. 13-3/8' set @ 2695', 9-5/8" set @ 3579' and open hole to 3690'. A CBT and CET were run on the well; both logs show fair to excellent bonding of the 9-5/8". We know of no problems with the well. The last MIT was witnessed by John Spaulding on 7/11/96, it passed. Water to Surface, PBU DS-4 March 17, 1997 Page 5 Sequence of Events 3/17/97: In the early afternoon of Monday, March 17, 1997 Dave Hanson, ARCO, called and reported that there was a water flow on drill site 4, EOA, PBU. He reported that at about noon water started coming up around 6 wellheads - no hydrocarbons; adjacent wells were shut-in; area bermed; water flowing into reserve pit; seeping 10 to 20 BPM. 3/1897, Tuesday, Mark Majors, Mike Bill, and Willie Friar briefed the commission. They said that at 10 AM the flow rate was 5 BPM; the water was coming out of 4-17 wellhouse and up around wells but also thru the pad between wells. Well 4-17 injects sea water for enhanced recovery while 4- 19 is a slurry disposal well for the grind and inject plant. They also reported that when 4-19 is shut-in, the tubing pressure will go to O; 4-1 9 has a kink in the scab liner at -5500'; they have 26 geophones in 4-12 with the top one being at about 1900'(?). 3/18/97: Bobby reported they did an MIT on 4-17 by pressuring it to 3000 psi, it lost 20 psi in 30 minutes. During freeze protecting of 4-19, they pumped 245 bbls at 5.5 BPM, water came up by 4-46 (end of pad). At --6 PM Bobby reported the MIT on 4-19 was good and he suggested they plug the tubing and test it. Note: MITs were run on wells 4-17, 4-19, and 4-20. Wells 4-17 and 4-19 demonstrated mechanical integrity, however, well 4-20 did not. On 4/8/97 Bobby reported that per ARCO's David Smith, a noise log in 4-20 indicated the packer had failed. 3/19/97: Bobby reported that the flow was less than one BPM. They will go into 4-19 for cleanout and back flow then set an inflatable packer in the tubing and pressure test the tubing. I reviewed the CQLs of 4-19 and determined that although between the primary stage and the second stage, cement carried very well up the hole, there were no significant intervals where the casing was well cemented. Considerable channeling was evident. 3/20/97: Bobby reported on 4-19, they tagged fill at 5901'; will run the temp. decay logs which will take 4 or 5 days, then will log 4-1 7. In 4-20 fluid level at 600' so freeze protected it also. Dave Smith leaving today and Richard Ortez coming tomorrow. The flow has stopped. Water to Surface, PBU DS-4 March 17, 1997 Page 6 3/21/97: Bobby reported logging of 4-19 completed, set packer at 5704' and pressure tested tubing to 2000 psi ok. 3/25/97: John reported that he discussed well 4-19 with ARCO and that they will probably want to inject to find the problem. Richard Ortez and Marty Lemon called, they did temp survey in 4-19 - Iow chance of a channel. Logged 4-17 from 2000' to surface - no temp anomaly. Plan is to: 1. Do a pump in borax PNL log, 2. Pump-in 2000 to 3000 bbls, and 3. Do an extended test of 1 to 2 weeks if the results of 1 and 2 are not conclusive. I said I thought that was a good plan. 3/26/97: Called Mark Majors and unloaded my questions. 3/27/97: Richard Ortez and Mike Bill called and reported the following: Ran PNL in 4-19 - no channel above squeeze-perfs. Pumped 1 750 bbls and no broach. Nothing at 4-1 7, ran several passes with PNL to pick up borax. Mike Bill and Willie Friar are the people in charge of determining the next step. They answered my questions as follows: 9&5/8 DV at 4487'. Ran 11/21/94 PNL to prepare for grind and Inject - baseline temp log showed erratic signal in the channel and they had a doubtful bond log. Ran 4/7/96 IPROF which showed the 5622-27 perfs leaking - while tagging for fill, found the dirt level at base of squeeze perts. Inject thru squeeze perfs for the second season. Tubing tail at 5509' - tried to force injection back down and backed off the 7" x 5&1/2" - parted casing depicted by the LIB may have been the 5&1/2" liner collars. The 4&1/2" scab liner kinked at 5430' 3/28/97: Bob Crandal and I reviewed the original "Dual Induction Focused Log, Gamma Ray" for confining zones. We determined major confining zones as follows: 5570-5520- 50', 5182-5135 = 47', 4865-4470= 95', 4720-4636-82', 4440-4310-130', & 4015-3970=45' total of major confining zones is 449' 4/3/97: PBU DS-4 Meeting: Mark Major, Mike Bill, Willie Friar, & Joe Schmidt from ARCO. Important points make by ARCO were: * Water at surface first noticed at well 4-17, shooting out of the wellhouse. * Shut-in wells 23A-46. * Thaw bulb diameter up to 60' radius - Jean Winegarner * No pad subsidence. * Normally 80-90 decj F slurry into 4-1 9, then drops to 60 deg. Water to Surface, PBU DS-4 March 17, 1997 Page 7 * Ran RFTs in new well 4-49. * On 4/18 pumped 245 bbls freeze protection down 4-19, flow increased at the surface. * 7 out of 10 wells (around 4-19) needed top jobs. * The Video camera run in 4-19 in June 96 showed the dirt level at the base of the squeeze perfs. * Joe showed lab tests that indicated a channel opening (described as a blunt fracture) that continued with injection. * Surface Casing shoe FITs were as follows: 4-7 - - 13.8, 4-18 - - 14.0, 4-16-- 12..5, 4-19-- 12.8, 4-23-- 11.2, 4-24-- 11.2, 4-33-- 11.4, 4-36-- 12..7, 4-47-- 13.3, &4-46--13.4 ppg. * Plans: Conduct thermal wellbore modeling and fracture modeling; and if grind and inject is selected as the method for disposing of reserve pit fluids, they plan a new, dedicated grind and inject disposal well on the Servco pad about 1.5 miles away. Dewayne Schnorr, Schulumber, came over at my invitation to explain some Logs to me and other commission members. We looked at logs of 4-19. * Dewayne stated that the CBT & CET indicated no cement bonding on the 9- 5/8" long string. The CET showed some "minimum" compressive strength of about 100 psi, therefore it was probably mud. · The USIT log showed some places of "ovalality" between 4390 & 6500'. We checked for coal beds, there were none; we then checked the deviation survey, the hole appeared to be free of dog legs. (Bob is doing a detailed sturdy of these deformations). 4/4/97: Mark Major, Willie Friar, and Joe Schmidt came to the commission to discuss future plans regarding 4-19 and grind & inject disposal. Their seismic people had not seen any indications of faults around 4-1 9. Flattening out was notice about 2300'. Joe explained that "closure" associated with the injectivity test represented the fracture closure pressure. 4/15/97: Mike Bill reported to me that the fine material recovered from Pad 4 did not contain barite. Water to Surface, PBU DS-4 March 17, 1997 Page 8 WELL HISTORIES Well History, PBU 4-17 (PTD 86-020) Spudded 1/28/86 was drilled to 9868' (8932' TVD); 13-3/8" surface casing (68 & 72// K-55 & Lo80) was cemented at 3522' in 17-1/2" hole with 3700 sacks; 9-5/8' production casing (47//L-80) was cemented at 9855' in 12-1/4" hole with 700 sacks. PBU well 4-17 (PTD 86-020): spud 1/28/86; total depth 9886"(8932 TVD); 13-3/8" 68&72# K&L, 17-1/2" hole, 3522', 3700 sx + 200 sx top job; 9-5/8" 47/1 L, 12-1/4" hole, 13' off btm @ 9855' with 700 sx. Rig Release 2/13/86 - no tubing, unperforated. Ran tubing 3/27-31/86. Perforated well 6/6/86 w/4 SPF 9685-9704', 9675-9685' & 9665-9672'. Put well on injection 8/11/86. Reperforated well 10/29/86 w/4(?) SPF 9636-9654'& 9610-9632' -injection increased 5950 to 6947 bwpd. The above are the only records in our file of work done on well PBU 4-17. An acoustic Cement Bond Log ran on 2/16/86 indicates excellent bonding to - 9460', good bonding to -~ 9200', Successful MITs were conducted on 10/7/86, 10/14/88, 7/26/92 PO, 3/23/95 PO, and 7/5/96 PC (the last test was witnessed by Charles Scheve). Our files reflect no problems with this PBU well 4-17. Well History, PBU 4-19 (PTD 86-024) Spudded 3/30/88; total depth 7000' MD & TVD; 13-3/8" 68&72# K&L, at 2984 in 17-1/2" hole w/2500 sx CS III + 600 sx CS II; 9-5/8" 47//L, at 6993 in 12-1/4" hole, cmt'd with 820 sx around shoe, and 530 sx thru dv at 4487'; pumped 300 sx down annulus followed by 135 bbls arctic pack; Rig Release 4/11/88 after running tubing - no perforations. 5/15-16/88 perforated 6 intervals 3/31/89 perforated 3 intervals 5/31/89 perforated 6 intervals 9/03/89 perforated 8 intervals 6882' 6454'--- 6366'--- 6172'--- - - - 6454' at 4 SPF - 168', 672 shots. 6366' at 4 SPF - 53', 208 shots. 6246' at 1/2 SPF 120', 60 shots. 5930' at 1/2 SPF 135', 80 shots. 476' 1020 shots A Cement Bond Loq (CBT) ran on 4/9/88 indicates no cement bonding. A Cement Bond Log (CET) ran on 4/9/88 indicates extremely poor cement bonding. The cement bonding above the DY collar at -4487' is not significantly better than the bonding below it. Overall, the log indicates poor bonding/considerable channeling. Successful MITs were conducted on 4/--/88, 10/14/88, 11/17/88, 7/29/92, and 6/1 7/96 PO. Other File Information Water to Surface, PBU DS-4 March 17, 1997 Page 9 February 1991 - ARCO reported that the casing and tubing pressures were "close" but "The pressure histories do not indicate there is a tubing to annulus communication problem at this time." June 24, 1992 - ARCO reported: Cretaceous disposal well, Currently taking pit dewatering fluid. Very small Tubing X 9-5/8" pressure communication is present. * After bleeding down, it takes more than 1 week for the 9-5/8" pressure to slowly increase and equalize with the tubing pressure (1 200 - 1300 psi). * At this time the leak is too small to find with conventional leak detection logging operations. * 9-5/8" casing is considered competent to liquid to 2000 psi (6/9/92). 9-5/8" pressure decline was 2% during the MIT operation (35 psi/30 minute test). Plan * Maintain well on water injection service. * Should leak worsen in the future, evaluate leak detection options." "Description of work Completed Pre-Grind & Iniect Channel Cement Squeeze" 11/21/94: Performed a Borax PNL, indicating a channel was present from 5930' up to 4500' MD. Log ran as a pre "grind & inject" data gathering program. 2/9/95: RIH & tagged PBTD at 6642'. 2/12/95: Set inflatable bridge plug at 5750 to isolate perfs 5930-6882'. Capped plug w/lO bbls gelled sand slurry followed by 500 lb. of CaCO3, top at 5719'. 2/17/95: Tagged CaCO3at 5853'. Shot holes 5622-5627'. 2/18/95: Pumped gelled sand slurry to raise top of sand plug - tagged at 5655' 2/19/95: Acidized perfs by pumping 50 bbls of 1% NH4CL water, 10 bbls Xylene, 54 bbls 12% HCI w/10% Xylene, 34 bbls HF - 0.75 % HCI, 109 bbls 1% NH4CI water, 34 bbls diesel, followed by shutdown. 2/20/95: Squeezed perfs by pumping 45 bbls of Thixotropic cement thru CT with no pressure bump. Hesitation squeeze pressure to 950 psi & placed 38 bbls of cement behind pipe. Pumped 5 bbls Neat G cement, 30 bbls G cement w/lO ppb aggregate, 14 bbls G cement w/0/5% fibers, followed by shutdown. Hesitation squeeze pressure to 1100 psi & placed an additional 46 bbls behind pipe. 3/2/95: With CT, cleaned out to 5611 and tested casing to 1500 psi OK. 3/7/95: Cleaned out cement to solid obstruction at 5925' 3/10/95: RIH w/IBP spear, deflated plug and it went downhole to 6598', washed perfs 5930 - 6598'. Pushed plug to 6700'. 3/20/95: Step Rate Test. A "Cretaceous Data Frac to gather Reservoir Grind & Inject response", was performed at rates from 1 bpm to 15 bpm. "Took 33 minutes to closure at 3200 psi. Repeated sequence, closure at 3196 psi. 4/2/95: Perforated 5995 - 6005' "to generate a seismic shock for the Grind & Inject Observation well geophone testing/calibrations (geophones located in Well 4-12)" Reshot the above perforated interval. Water to Surface, PBU DS-4 March 17, 1997 Page 1 0 4/20/95: RIH & tagged PBTD at 6267'. "The well is currently on 9.5 ppg slurry disposal injection. Average injection rate & pressure (w/bypass fluid included), is 22000 BWPD @ 1450 whp." Description of Work Completed, 4-1/2" Scab Liner Installation 4/7/96: Performed an IPROF which showed the squeezed perfs leaking (5622-27'). 5/31/96: Tagged fill at 5628' - all perfs 5930 - 6882 covered with fill. 6/1/96: Video camera recorded casing split at 5626' 6/12/96: Perf'd 561 7-22' 4 SPF to observe response by geophones in PBU 4-12. 6/14/96: Borax PNL showed channel from casing split at 5626 to 5524 - 102'. 9/14/96: Milled XN Nipple at 3098' to 4.75". Tagged fill at 5615'. Jetted thru fill to 5640' couldn't go deeper. LIB at 5515' showed imprint of casing edge. 10/8/96: Tagged fill at 5634'. 11/2/96: LIB at 5502' showed imprint of casing edge. Milled tight spots 5538-40' & at 5616' - went to 5656'. Lost BHA. Tight at casing collar at 5048'. 11/3/96: Tagged obstruction at 5538'. RDMO CTU. 11/8/96: RIH w/fishing BHA, latched and jarred fish free. POOH with fish. 11/10/96: W/CTU milling BHA, milled thru 5-1/2', cement sheath (?) & to 5940' 11/11/96: Tagged fill at 5978'.. 11/16/96: Tag PBTD at 5940'. Place sand plug to 5900'. Tagged at 5925' 11/23/96: Kill well with 9.5 ppg brine. RIH-with 4-1/2" scab liner. 11/24/96: Ran liner and landed on plug at 5895' - top 2971'; cmt'd w/65 bbls "G", (theoretical fill 1215', TOC @ 4680'). Liner designed to cover split in casing and leaking perfs. Ran liner top packer & seal assembly - set at 2936. 11/26-28/96: Cleaned out cement and fill to 6582'. 12/01/96: Step Rate Test. Performed a step rate test with pressure sensor at 5928'. Rates from 3 bpm to 20 bpm. 12/19/96: Tagged PBTD at 6082'. '12/21/96: Cleaned out to 6250'. Left well shut in awaiting future grind &inject materials for injection. Analysis of DS 4 Water Flow to the Surface, How did it get there? ds4-flow This report is the analysis section of Blair Wondzell's 4/8/97 report "Water- to-Surface, PBU DS-4, 3/97. This analysis results from investigations of Blair Wondzell and Robert Crandall with constructive help from Jack Hartz. We believe the water flow path from down hole to the surface is as follows: A. Disposal water flowed up the outside of the 4~ 19 casing to the sands under the permafrost where it collected. B. Over time, the thaw bulbs extended between the wells and thru the permafrost. C. Pressure build-up caused a flow path to surface to become established. We'll now separate the above postulation into individual events or segments and examine them carefully. A., Water flowed UP the outside of the 4-19 casing to the sands under the permafrost where it collected. After injecting 13,568,629 bbls of water, on 8/29/89 a temperature survey was run in well 4-19; the survey showed a temperature anomaly of 1 2 deg at 2220', 24 deg at 2910' and 29 deg at 4315'. In our limited study of Prudhoe Bay Field temperature surveys, lithology anomalies are normally not over 5 deg. (we found one ~) 8 deg.); since these anomalies are over 10 deg, we conclude they are fluid anomalies which depict large volumes of injected water that has not yet had time to cool down to geothermal gradient temperature. See AOGCC Figure 1 which shows various temperature log runs in 4-19. The fact that each of these anomolies coincides with the presence of highly porous sands behind pipe also supports this conclusion. Further evidence that the anomalies over 10 deg. are fluid induced derive from the fact that after the broaching, temperature surveys made in several pad 4 wells, all depicted the temperature anomaly at -~ 2200', most showed the anomaly at -2900', and only 4-19 showed the anomaly at -4400'. None of the fluid anomalies were evident in a July 1987 temperature survey in well 4-6 -lithology anomalies up to 5 deg were depicted from 2500' to 3100' and from 3700 to 4200', therefore we conclude that the anomalies present in 4-19 in 1989 and in the pad 4 surveys run after the broaching are due to the presence of injected fluid. In the Thermal Modeling section, ARCO contends that the anomalies between 2000 and 3000' were predicted by their model and were probably "caused by the presence of the surface casing and insulating arctic pack gel through this zone and the absence of the permafrost as a 'heat sink'" Investigative options: Analysis DS-4 Water Flow to Surface Page 2 *Check location of surface casinq shoes - of the 7 wells temp surveyed after the broach, 3 have surface casing shoes at about 2500', 1 shoe is -3000', and 3 are -3500'. The wells can only be "arctic packed" down to the surface casing shoe, but the 3 wells with shoes near 2500' show the anomaly to -3500'. Therefore ARCO's conclusion appears to be incorrect. *Check other wells similarly completed for the anomalies. Not pursued. Regarding the reversal near 2300', (see Figure 1) ARCO examined 10 well on DS 4 and DS 9 dating back to 1991 "It was found that a similar effect was seen on virtually all of the wells, and coincided with the location of the subsurface safety valve. The most likely explanation is that produced gas flowing past the SSSV restriction expands and locally cools the well bore and surrounding soil." Investigative options: *Confirm location of SSSVs at -2300'. Not pursued. *Find other wells that do not exhibit reversal that have SSSVs at -2300'. Not pursued. *Check well status. Wells 4-17 & 4-19 are injectors, wells 4-24 & 4-26 have been shut~in since 11/96 & 7/96 respectively. Therefore ARCO's conclusion is not supportable. *Other - the "cooling" anomaly at - 2300' coincides with a shale that did not heat up as much as the sands above and below it. Why are the anomalies so great? The injected fluids are normally at temperatures of 65 to 95 degrees. Also, for injected fluid to go into the 2200' sand it first had to go down the tubing and exit the casing thru the leaking squeeze perfs at 5622' or at the top of the perforated interval at 5930' where the geothermal gradient temperature is about 110 to 120 degrees, thus providing some warming to the injected fluid. How did the fluid go from the perforations at 5930' (or 5622') to the sands at 2200'. The various cement quality logs (CQLs) run in 4-19 show that the 9-5/8" casing is poorly cemented from the shoe at 6992' to the shoe of the 1 3-3/8" surface casing at 2984' (there was no CQL on the surface casing). In addition, an 11/21/94 borax PNL log run in 4-1 9 depicted a large channel from the upper perforations at 5930' up to and extending off the end of the log at 4465'; the channel probably extends up to the base of the surface casing shoe at 2984'. Our analysis indicates the surface casing is well cemented in 4-1 9 (see AOGCC Figure 2 which list data on the surface casing cement jobs of wells within 2000' of 4-1 9). Based on our analysis, we believe the fluid channeled up the outside of 4-1 9 to near the shoe which is at 2984', then thru sand to an adjacent well. Which adjacent well? There are 3 wells with surface casing shoes within 1 50' horizontally of 4-19, they are: 4-24, 4-18, & 4-1 7. Generally, wells are adequately cemented for about 500' above the casing shoe. Of the 3 wells listed above, only 4-1 7 has a surface casing shoe deeper than 3500', its at Analysis DS-4 Water Flow to Surface Page 3 3522' (the other 2 have shoes at 2538' & 251 7' resp). The best candidate is well 4-1 7. Also, at the surface, water was first noticed coming out of the 4- 1 7 well house. ARCO makes this statement in their report "It was noted that on freeze protecting well 4-19, there was a direct increase in surface rate around 4- 17". The flow path was probably thru the sands at about 3000' tvd from 4-19 to 4-17 (a distance of less than 150'), then up 4-1 7 to near the base of the permafrost (see AOGCC Figure 3 and note the relative depths of the surface casing shoes). This flow route was established sometime prior to 8/29/89. B. Over time, thaw bulbs extended between the wells and thru the permafrost. In the Thermal Modeling section of their incident report, ARCO makes the case that the thaw bulbs around the individual wells have expanded and became interconnected. They mention other studies that support this conclusion - we agree that this is probable. Of interest is the volumetric capacity of the thawed permafrost. See AOGCC Figure 4 which shows the row of wells in the NE part of the pad. Considering 60' between well heads except 30' between 33 and 47, the length of the thawed area where the water surfaced is 930'; the width is 120' and therefore the area is 111,600 sq. ft. Assuming the depth of the permafrost is 1 900', the bulk volume of the thawed permafrost is about 212,040,000 cu ft. At 30 percent porosity, the pore volume of this section of thawed permafrost is about 11,328,940 bbls. For comparison, the 18,200 bbls recovered from the surface of DS 4 represents about 0.161% of the above described pore volume. Also for comparison, at 20 bpm, ~-30,000 bpd, it would take 378 days to inject that volume (11,328,940 bbls). Its more likely to consider that the pore volume available in the thaw bulb is only the volume available because of the change-of-state (ice to water), or 9% of the pore volume, there would be 1.0 million bbls available. However, in all probability, the pore space of the surface gravels is more likely about 40% and there would be some ice rich areas, the two combined could be 50% of the bulk volume. The 1.0 million bbls now becomes 2/3 larger or 1.7 million bbls. These numbers are only intended to show the magnitude of the thaw bulb volume and are not specifically used in this analysis. Analysis DS-4 Water Flow to Surface Page 4 C. Pressure buildup causing a flow path to surface to become established. The best data concerning "where the water went" comes from temperature logs, step-rate-tests, fill tags, and borax logs - all used in conjunction with the mechanical condition of the well. Temperature Ioqs reflect current temperatures - interpretation is necessary to determine the significance of the temperature readings. Step-Rate-Tests (SRTs) depict the ability of the receiving formation to receive injected fluids. Fill tags record the build-up of solids in the wellbore. Fluid is presumed to exit the well above the top of fill o in producing wells, production is considered to be entering the wellbore above the top of fill. Borax Ioqs reflect the conditions under which the log is run - they may or may-not reflect injection conditions. If injection has been occurring at 20 to 28 bpm and the borax logging fluid is pumped at 1 bpm, the logs may not depict all of 'the zones taking fluid at normal injection rates. Grind and Inject Season //1, (solids injection 3/31/95 - 5/10/95). Prior to the //1 G&I season, a borax log indicated a channel from the top of perfs extending above the top of logged interval at 4465' Therefore holes were shot, acidized, and squeezed at 5622-5627' Effective depth (ED) was at 6700'. The SRT on 3/20/95 showed the well started taking fluid at -3000psi (approx. avg. of the two tests), leak-off occurred until a rate of about 7 bpm at 3600 psi, then fracture extension occurred until a rate of 17 bpm @ 3770 psi (see AOGCC Figure 5 which shows the 3 Step-Rate Tests). Presumably injection was occurring into formations below the sqz. perfs at 5627' After reviewing the available data, including the 11/12/95 SRT, the 3/20/95 SRT probably reflected injection into formations below 5635' Sequence: fill tagged 3/10/95 @ 6700', 3/20 SRT, tag 4/18 @ 6507', tag 4/20' @ 6267', & tag 5/16 @ 5627' SRT conducted with all perforations uncovered and the channel squeeze. After solids injection started, fill started building up in the wellbore indicating that the squeeze perforations broke down and were taking fluid. Commonly, fill will build up to the interval taking most of the fluid. We don't know if the squeeze perfs broke down because of the solids build-up or if the solids build-up occurred because the squeeze perfs broke down; regardless, the channel behind the casing was re- established. Grind and Inject Season //2, (solids injection 12/11/95 - 5/28/96). On 11/11/95 ran a DHS1 (downhole shut-in survey), ED (effective depth) @ Analysis DS-4 Water Flow to Surface Page 5 5627', bottom of squeeze perfs. On 11/12/95 ran a SRT to 17 bpm (see Figure 4) - slope was constant and fracture did not occur. Therefore, interval taking fluid was different than for the 3/20/95 SRT and was very porous - high permeability. Sequence: 11/11/95 tag fill at 5627', 11/12 ran SRT, 1/15/96 tag fill @ 5589 & CO (clean-out) to 5637', 2/9/96 temp log indicated channel 5622 - 5535', 4/7 IPROF (injection profile log) indicated squeeze perfs leaking, 5/23 tag fill at 5626, CO to 6150', 5/28 last solids processed, 5/31 ED reached 5628' (5600' uncorrected). NOTE: 28' difference between the corrected and uncorrected depths. A 6/1/96 video log recorded a casing split @ 5626'; the split was described by Mike Bill as ragged, the width of a perforation, spiraling downward from perf to perf for a distance of a couple of feet. (Csg perfs 4 spf at 90 deg). Pit dewatering occurred from 6/1 6 to 7/7/96. On 11/24/96 a scab liner was run & cemented from 5895 - 2971' with pack-off on top. Grind and Inject Season #3, (solids injection 12/04/96 - 3/1 7/97). Tag fill at 6582' on 11/28/96, SRT on 12/1/97 - 3 bpm @ 3700 psi, 5 bpm @ 3800 psi, & 20 bpm at 3890 psi. (see Figure 5). These rates vs pressure are reflective of creating a tremendous fracture - going from 5 bpm @ 3800 psi to 20 bpm @ 3890 psi.; they are more reflective of friction loss in a pipeline and are not expected of injection into a formation. Sequence: 11/28/96 tag fill @ 6582', 12/1 SRT & start water injection, 12/4 start solids injection, 1 2/1 2 tag fill @ 6132', 12/1 9 tag fill @ 6082' (6048' uncorrected),12/21 tag fill @ 6063, CO to 6250', 1/8-9/97 temperature and water flow log ED fill @ 5932', 3/17 fluids broached, 3/20 Temp Log reached 5918', 3/26 & 27 logs reached 5926', 3/27 freeze protect 4-19 at 3 bpm and seen response at surface. Question: Top of fill at top of perfs, where did the water go? (See AOGCC Figure 6 for a listing and graph of some fill heights vs dates). 12/1/96 SRT saw a sudden and dramatic breakdown at 3800 psi at 5 bpm. Possibilities include: * Squeeze block broke down, * Channel developed between the scab liner and the casing, * Casing split extended downward. *Squeeze channel broke down. The second run of the SRT repeated exactly. If the squeezed cement which blocked the channel ruptured, it would be Analysis DS-4 Water Flow to Surface Page 6 expected to open at a lower pressure on the second run - it opened at the same pressure. Therefore we do not believe the squeeze block broke. *Casing split extended down to below the base of the scab liner. If the first run split the casing downward to below the base of the scab liner, the second run should have exhibited pipe flow at a lower pressure. It did not, therefore we don't believe the casing split. *Channel developed between the scab liner and the casing. DS 4-1 9 was drilled as a straight hole with deviations ranging to 5 deg. of vertical; the deviation at various depths is random - not all in the same direction. A liner run inside of casing will be in contact with the inside of the casing unless the liner is adequately centralized. If the uncentralized liner is cemented, there will be no cement sheath Where the liner and casing are in contact. With enough pressure, it is possible that the casing and liner could or would separate, allowing water to flow between the liner and casing and out the squeeze perfs and up the previously established channel. When the pressure was decreased, the liner would again be in contact with the casing. On a second run, it would take as much pressure to re-establish the separation as it did on the first run. So far, the data fits this concept, but if that's really what happened, then there should be fill over the top of the lower perfs. Listed below are the ED tags Base of scab liner at 5895, 35' above the upper perfs at 5930'. 11/28/96 wireline tag ED @ 6582'. 12/4 start solids injection. 12/12 wireline tag ED @ 6132' 12/19 wireline tag ED @ 6082'. 12/21 wireline tag ED @ 6063', CO to 6250'. 1/8/97 ELM ED reached, 5932' } NOTES: 03/17 fluids broached to surface. }*Bottom of liner @ 5895' 3/20 ELM ED reached, 5918' }*Top of perfs @ 5930'. 3/26 borax PNL ED @ 5926' }*Depths may not be consistent. NOTE: On 7/14/97 ARCO told me the video log (4/17/97?) showed turbulence at the base of the scab liner, therefore they were suspicious of flow behind the liner. There are two other interestinq occurrences: 1) what caused the 3 rd SRT to exhibit a decidedly different characteristic than the previous 2 SRTs, and 2) what caused the fluid that had been going horizontally to start going vertically. We don't have good ideas on these two items, but some of our considerations are presented below. 1) SRT 3 does not reflect the same formation as SRT 1 which is probably reflecting the formations below 5627' or the formations in SRT 2 which are probably above 5622' SRT 3 appears to reflect a pressure relief valve and a pipeline; could it be flow into the thaw bulb? Analysis DS-4 Water Flow to Surface Page 7 2) Fluid flowed vertically because that flow path required less pressure than continued horizontal flow. We can think of two possible reasons: A) because horizontally, the sands became plugged with solids from the grind and inject facility which reduced the "flowability" in the horizontal direction while B) the vertical flow became easier as the permafrost around and between the wells melted (slumping would occur near the well bore except at the base of the thaw bulb where upward elastic flexing of soil would occur, it may be that the third SRT represented flow into the "now thawed" permafrost region. Further evidence for this conclusion can be discerned from an examination of the 3 "pre-broach" temperature runs shown in Figure 1. The May 94 run - produced water disposal - shows fluid anomalies from the bottom of the graph at 6000' to -4100' - the shale areas which did not accept fluid are very noticeable. The Dec 96 run - grind and inject - shows a reduction of the May 94 anomaly and shows that the formations near 5800' and near 4500' contain fluid, but at a reduced thermal mass. However, the Jan 97 run shows a reduction in the thermal anomaly of the formations between 6000' and 4000' - they may not have been taking fluid. One possible conclusion is that all fluids were going into formations above 3000'. (Note: Temperature log runs after the broach show a fluid anomaly in the sands between 5500' and 4200'; therefore, sometime between Jan 97 and the broach, some fluid was injected into those sands). Conclusions: During most of the injection life of 4-19, fluid was going up the outside of the well and into the SV1 sand at -4500' and up 4-19 to near the surface casing shoe at 3000', going thru the sand or sands to well 4-17, then up the outside of 4-17 to the sands underlying the permafrost. This operation occurred until late 96 or early 97 when the lower-most sands below 4000', stopped taking injection altogether. At that time the flow was all going up to the base of the permafrost and into the thawed zone where it collected under the surface seasonal thaw until the pressure and heating of the water caused the flow to break thru to the surface. The pressure build- up in the thawed zone and in the sands below the permafrost provided the pressure for 18,000 bbls to broach after injection in 4-19 was stopped. List of Fiqures AOGCC Figure 1 AOGCC Figure 2 AOGCC Figure 3 AOGCC Figure 4 AOGCC Figure 5 AOGCC Figure 6 4-19 Temp Log Runs Sfc Csg Cmt'g near 4-1 9 Depths of Sfc Csg Shoes Near 4-19 Wells Near 4-1 9 Step-Rate Tests Fill Depths vs Dates, in 4-1 9 Analysis DS-4 Water Flow to Surface Page 8 Requirements For The Future: Based on our analysis of the DS-4 incident, on future disposal/grind and inject wells, as conditions warrant, in addition to MITs we may require the following: 1. CQLs demonstrating that all casing strings are fully cemented, 2. Pre-injection step-rate tests - taken to the higher of injection rate or pressure, with follow up tests as warranted, or at time or volume intervals, 3. Pre-injection temperature surveys, especially gradients, with follow-up tests as warranted, or at time or volume intervals, 4. Borax-PNLs or equivalent, as warranted, 5. Frequent ED tags to locate top of fill, This completes our investigation of the DS 4 broaching incident unless new or newly revealed information come to our attention. Although this may not be the last word on what happen, we believe it is a reasonable analysis of what could have happened. July 21, 1997. B~i-r Wondzell~ ' Rol~r~ran~tall ' DS 4-19 Temperature Passes 120 110 lO0 90 80 70 60 ,t t 0 1000 2000 3000 4000 5000 6000 Depth MD Ft 3/20 0745 ~ 3/20 1145 ......... 3/20 1545 Pass 7 Pass 8 - -- --- May 94 ~ .*- .~, Dec 96 ---,<- -~Jan 97 I, Sheet1 AOGCC Figure 2 Sfc Csg Cmtg near 4- SUMMARY" SFC CSG CMT'G - WELLS WITHIN 2000' OF DS 4-19 sc cmt job 10-Jun-97 (see notes) Well no. PTD'- ~ig hew arco Descriptive~'ement JOb Comments from the Well File FIT DS 4-11 78-006 R 34 F/G -May 13 3/8 72N @ 2739 w/5900 sx 15.2ppg AS II pump 1-5 bpm 12 Top Job thru 1" w/15sx. FIT to 12ppg DS 4-16' 83-098'R 41 -GOod May'13 3/8 72E @'2'665 W/2040 sx fondu 11.7ppg @ 9bpm, returns at 1990sx 12.5 then 400 sx 15.6ppg PF "C", floats held. FIT to 12.5 ppg DS 4-17' 86-020 R 33 -P/F Prb i3 3/8 68K @-3-522' w/3300sx CS III @12.2, Tail w/400 sx CSll @15.0 ppg. - 13.8' BP 2000Psi. #'uli rt-ns, no cmt. 200sx T J, CS II @ 15.0 ppg. FIT to 13.8. DS 4-18' 85-315 R 33 Poor May 13 3/8 72L @ 2517' w/3000sx CSlII 12.2 6 __bpm + 400sx CSll 615.0 .... Bump plug.~o-cmt t° sfC:-Topjob w/150sx CS II 6 15.0 DS 4-19' 88-024 D 9 Good May 13 3/8 72L no recip 2500 sx CSlII 12.2+ 660 sx CS II 15.9 disp 5bpm .......... 12.8-Bump plug 17-00. Floats ok. Good cmt returns. LOT 6 12.8ppg. DS 4-20 83-119 R 41 Poor May 13 3/8 72L 6 2528' 1935sx Fondu11.7 + 400sx PF "C" 15.6 floats held. 10.1 FIT held 10.1pp.q EMW. -- NO TOP JOB --. (DA- well hd leans 3 deg.) DS 4-21 '8-5-~;I-'2-R-33-15°or May-13 3/8'72L'6 2393 3000sx CSIII 12.2 + 400sx CSll 15.0. Bump 15 stks 10.3 early. Floats held. Cmt to sfc 230sx. LOT 10.3 ppg EMW. DS 4-22 85-293 R 33 Good Prb'13-3/8 72L 6'2522 w/1026b CSIII 12.2 + 68.5 b CSII 15, BP 2000psi floats ......... 11 'oki'200 B cmt-'to sfc. LOT 11.0 ppg EMW. DS 4-23 '-85~2-~-4'R 33-G°od Ma~-';I 3-3/8 '72L'6-4~0-66 w/3500sxCSIII 12.2 + 400sx CS II 15, BP2000psi 11.2 Floats ok. 300B cmt rtns. LOT 11.2 EMW. DS 4-24'-'85-30i 'R 33 --Fair P~'b -i3 3i8 72L-~-2'~3-8 W/280-0 cS III 12.2 = 400sx CSII 15.0, BP 2000Psi 11.2 Full rtns, no cmt to sfc. 150 sx TJ. FIT to 11.2 EMW. DS 4-25 '86-~49-P191'G0od May- 1~-3/8 721- @-410~"W/3000sx CS III 12.0 + 400sx G 15k.8, No bump. 13.1 Full circ, cmt to sfc. floats ok. FIT to 13.1 ppg EMW DS 4-33* '86-035'R 33 P/F M/L '13 3/8 72L 6-27~,'7w/3500Sx CSIil + 400sx CSII. BP 2000psig. Cmt ........... 11.4'c~)ntamina'ted-~ud, 'no c~ to. sfc. 200sc TJ. FIT to 11.4 EMW. DS 4-34 91-054'N 28 ~poor Yes' 1~)-'3/4 4515j @ 3-955 W/1300Sx ASIII 12.07 + 350sx G 15.8ppg. BP2000 13.2 Floats held, good rtns thruout. 3/4" to 116 cmt 236sx. LOT-EMW=13.2 DS 4-35 -91-039-N 28 -Poor Yes -10 3/4 45~5~--@ 3-9-30 ~/1300sx ASlII + 350sx G. Recip OK, Floats OK, no cmt 15.7 to sfc. Ran 3/4" pipe to 10'below 20", 314sx ASl 15ppg. LOT-EMW 15.66ppg DS 4-36* 91-057 'N 28 Poor Prb 10 3/4 45.5L'6 4448 w/499 B lead + 72 B tail. Floats held. Top Job 350sx 12.7 (57 B) 15.5ppg. LOT-EMW=12.7ppg. DS 4-39 91-077'N 28 Poor Yes 10 3/4 45.51 6 4193 w/ BP w/2500 psi, no cmt to sfc. -' 14.6 Top jOb w/32-'B 15.7ppg. LOT-EMW +14.6. DS 4-43 '94~013-N 28 Poor Yes 9 5/8 47NT @--~,294'w/ - ' Recip csg, disp 6 12.5 bpm, BP 2000 psi 13.6 Gd Cir Thru0u~t,--~o cmt t~ sfc. Top Job w/250sx CSlI. LOT-EMW13.6ppg DS 4-46* ~9'3-1~7-N 28 Poor Yes ~1-0 3/4 45.5N~ 6 3-552 w/(prog 1140-12.2 csiii + 375-15.8 G). BP 2000psi ..... 13.4-Fl°ats ok. No cmt rtns.' Top Job w/42 B CSII. LOT-EMW=13.4ppg. DS 4-47* 94-003 N 28 Poor Yes 10 3/4 45.5NT 6 3875 w/(prog 1294sx-12.2 CSIII + 375sx-15.8 G) Disp 14bpm - ' 13.3'BP 2000. Floats Ok. Top Job w/250sx CSII. EMW=13.3ppg DS 4'-48 94-107 'N 28 Poor Yes '10 3/4 45.5NT-@ 4134 w/465 Cs III (12.2) + 77 G (15.8), BP w/2000psi, 14.1 Top Job prog(250-sx 15.0 CSII). FIT to 14.1 ppg. DS 4-49 96-171"D 14 'Good yes 10 3/4 45.51- 6-,~,069 w/1029 B + 81 B. BP 1200psi, Circ 145 B cmt to sfc ' 14.7'Circulated & Reciprocated csg. Ran USlT log. FIT to 14.7ppg. * Wells that "BroaChed''. .......... . Note 1' bew- Good, F/G= Fair/Good, P/F=Poor/Fair. - Based on returns' to surface. Cmt- Goo~Jlmud- F/G or P/F, none- Poor. Note 2: Arc0~ ML=Most Likely, Prb=Probably, M~y=Maybe. Base 0~ actions taken, not on result obtained -basically meaningless, d\ongoing\ds4sfcsg.xls Page 1 1000 2000 30O0 4000 5OO0 60OO 7000~--- 8000 4-24 % '%/%/%/%/%/%/, /%/%/%/%/%/%/ oontJnuous 4-19 DS4 4-18 ?/%/.%/% % / / /. /'%'/ G & I BROACH 4-17 /%/'%/'%,/%,/.%/ %/.%'/.%/%/%/% ,~Arct lc %'/ '/ '/cement /%,/%,/%,/%/.%,/. surface casing cement 4-16 4-33 4-47 4-36 4-46 i%/.%/.%/.%/%/ %,/.%/.%,/.%/%,/.%~ %/%/.%'/.%/.%,/'%~ %/.%'/.%/'%/%/%~ %/.%/'%/%/.%/.%* %/'%/%/'%/%'/'%,* %'/'%/%/%'/%/%' %/'%/%/%/%/'%' % %' % %' %' , ,%/'%/%/%/%/.%,~ :surface' .casing 'shoe Base Permafrost · · · Int.csg ' cement. Base ~U~u Base DR ILLSIT E O4 ,, ]NJ 10 38 8 ,,1 7 ST1 , i AOGCC Figure 4 /--,l,~ells near 4-19 ! //(' FL ARE)'"') i ,.,~'-%~',, Pm// t /'/ %. ,.,./ (.:3) ..... ;¢8u(?) 4.3 , (2) Snow Berm (3) Pit Area (4) SilT Comma_nd Ce=~ er (5) ~'ammp TzaJ.hz (6) Ckack Iz~ Tzaihz (?) Coz~dz~ztcy Iz~jac±/oz~ Pump & Ta.uk~ 4000 3900 3800 3700 36O0 3500 3400 3300 320O 3100 3000 29OO 28OO 2700 26O0 25OO 1 2 3 4 DS-419 All Step Rate Tests 3~95 (~5800' & 11195 @5500' & 12/96 @5928' 5 6 7 8 9 10 11 12 Wellhead Rate, bpm 13 14 15 16 17 18 '19 20 ® ST1-3/95 o ST1-11/95 [] ST2-3/95 · ST2-11/95 · ST1sm-12/96 r~ ST1sI-12/96 CD OQ AOGCC Figure 6 Fill Depths vs Dates iu 4-19 ~ 700O ' - ' I MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission TO: David Johnsto..~ DATE: Chairman ~ THRU: FILE NO: Blair Wondze~ P. I. Supervlspr ~1~'/~ FROM: Bobby Foster. SUBJECT: Petroleum InspE March 18, 1997 GB91CREE.doc Incident Report Water to Surface ARCO - PBU - DS 4 March 18, 1997: Chuck Scheve and I traveled to ARCO's DS 4 after receiving a call from Blair Wondzeil informing me that there was a water flow to surface on DS 4. Chuck and I went to ARCO's PBOC and met with Dave Smith, Annular Communication Engineer. Dave gave us a brief report on the problem and ask us to meet with Harry Engels, Incident Commander, and let him fill us in. Chuck, Dave and ! met with Harry and he brought us up to date. We ask for and received a drill site schematic and a copy of the incident reports which are attached to this report. Chuck, Dave and I then went to the drill site and looked at the problem. The flow had first been observed between wellhouses 17 and 18 but most of the flow was coming up between wells 18 and 19. A snow berm was built to contain or force the water into the reserve pit. Approximately 11,000 bbls. of water has come to surface as of 10:00 AM. Approximately 6500 bbis. are trapped in the reserve pit and 4,5000 bbls. have been hauled by truck and injected in other injection wells. A MIT will be performed on well 17, the Sea Water injector, as soon as possible and I will be notified of the results and will report same. Tuesday, March. 18., 1..997 - 2:15 PM - Dave smith called and informed me that the MIT results on well DS4-17 were 3000 psig initial- 2985 in15 minutes - 2980 in 30 minutes - a total loss of 20 psig with a tubing of 0 psig during the test - well 19, the other sea water injector had been freeze protected and no increase in surface water was noticed while this was being done - approximately 2,000 feet of 8" line (128 bbls) +- of fluid + 2000' of tubing had to be displaced. Tuesday, March 18,1997 - 3:30 PM- Dave called me again and informed me that he had contacted the crew at the pad and they said there may have been a increase in flow while well 19 was being freeze protected and that they were rigging up to do a MIT on well 19. i departed the office at 3:50 PM and went to Dave's office at PBOC and met with him and discussed possible cause, of the increase of flow. We agreed that the MIT on well 19 would tell us something. The crew called and said they had 2540 on the 9.625" casing on well 19. I departed Dave's office and went to the location - I went to the test truck and talked to Roland(crew foreman) and he said that the pressure dropped 40 psig in 30 minutes. I ask Roland if he had a wellbore schematic and he showed me his copy. I looked at the schematic and saw that a 5.5" X 4.5" scab liner had been set at 3,003' - 17' below the shoe of the 13.325" surface casing. This 4.5" tubing runs to 5,895' with a "cement sheath" around it - no packer. After seeing this I went back to Dave's office and ask for and received a wellbore schematic of well 17 and 19. I pointed this out to Dave and ask if he had a.ny plans to set a wire line plug in the tubing and test it. Dave said this should probably be done and would bring it up to his supervisors. ! pointed out to Dave with some of the problems we have had with cement jobs on surface pipe if the 4.5" had failed or if the "cement sheath" had give up the water could be coming up channels on the out side. Dave said they had had a channeling problem on this well but they had squeezed this off. I departed his office and went to the office. I called Blair at home at 6:00 PM and reported what I had learned, faxed a copy of well 19 wellbore schematic and this report to AOGCC office. Tuesday, March 18, 199'7: I received a call from Dave at 9:30 PM informing me that they had performed a MIT on well 4-20~- The inner annulus was pressured up to 2000 psig and the pressure fell to 0 and then the casing went on vacuum. They will try to do a MIT on the outer and inner annulus in the morning - 3/19/97. Wednesday, March 19, 1997 - 7:00 AM: I went to ARCO's PBU PBOC and met with Dave, Marty Lemons, Harry Engels and Bill Johnston and they said they were going to do some wire line work on well 4-19 to determine if there was fill in the wellbore and if there was none then they would rig up and backflow the well to tanks to recover the glycol/water freeze protection liquid out of the well. They would then set a plug in the tubing and do testing and logging for water movement by temperature logs. Thursday, March 20, 1997: Dave Smith called me at 7:45 AM to update me on the DS4 problem - He said the flow had stopped and that they had run and tagged fill at 5,901'. The next plan was to run temperature decay logs on 4-19 and 4-17 which will take about 3-5 days. He also informed me that he was leaving the slope and Steve Wysocki would be the new point of contact. Called Blair and gave him an update. Friday, March 21, 1997: I met with ARCO reps. this morning and was informed that Schlumberger was running temperature decay logs on well 4-19 and as soon as they were completed they would set a inflatable bridge plug in the tubing and pressure test the tubing. I received a call from Richard Ortiz, ARCO rep., called me and said he was ready to test the tubing. ! arrived at the location and was informed by Mike Bolkovatz, ARCO rep., that the plug had been set at 5,704' - 191' above the 4.5" tubing float shoe. Mike told me they tagged fill in the 9.625" casing at 5,918' E Line measurement - 12' above the top perforation. The tubing was pressure tested to 2,000psig and held for 30 minutes with a 40 psig loss of pressure. Richard and Mike told me that they were going to rig up on well 4-18 and run temperature logs on that well and also 4-46 and would keep me informed as to the progress. Saturday, March 22, 199.7: ! met with Richard Ortiz this morning and he informed me that they were still logging wells 18 and 26. He said just as soon as they got through with these wells they were going back to well 19 and run more logs on it and also they were going to log well 46. ! informed them that this problem would have to be solved and that it would not be let go like the problem on DS11-27 which happen almost 2 years ago to the day. Sunday, March 23, 1997: I visited with Richard Ortiz this date while doing a MIT on DS 17, the subject of another report, and he informed me that they were still running logs on wells 26 and 18 and still having meetings concerning were the water came from. He said he would keep us updated on the status of the on going work. In my opinion this well should have never been approved as a disposal well after discovering the 9.625" casing was damaged. As the attached wellbore schematic shows the 5" X 7" scab liner hanger was set at 2,947', 27' above the13.325" surface casing shoe. This is 2,670' above the top perforation, which is above the "cement sheath". The next open perforations are at 5,930' or 2,993' below the packer / hanger with the only protection being 4.5" P-110 STL tubing / casing between the fluid being injected and the formation since the 9.625" casing was known to have holes or splits in it. There is 300' between the top injection perforation and the perforations at 5,622' which is above the cement sheath giving a flow path back to the damaged 9.625". It is also my opinion that the setting depth of packers in disposal wells needs to be addressed by the Commission. Summary:. This is a decription of events that took place on DS 4 after salt water broached to surface. Attachment: Schematics of DS 4 wells and incident reports. X Unclassified Confidential (Unclassified if doc. removed ) Confidential , , DRILLSITE 04 LEGEND ~ PROOUCER · WAT~ ~NJ WAG 7 ST1 .- ! L. 21 ,'; 23A 24 =39 4----a11A -'25 ;48 · 12 - L---a 27 ~----a 14A -- P8 15 - 29 ~--~30 ST1 .' 31 ~ 32 = 37 Rev. 2/27/95 S~NT BY;PRUDt"IOE BAY .._. ' 3-24-97 ; 9:45 ; ARCO ENV/RO,~1'AL~ 9076592717;r 2.,'2 Drill Site 4 Fluids to Surface. Update 3/24/97, 07:00 hr. · No flnw of seawater sufficient tot' recovery by vacuum tracks and no seepage to Ihe reserve pit at Drill Site 4 has been detected for the past 72 hours. Monitoring for flow has been both on the ground and from the air using aerial infrared detection. · Contingency plans and acravitic.s are being maintained in case anv conditions changes. Crews ~c on standby to recover water ~hould flow reoccur. ' · No injuries have been associated with this event. There. has been no impact to wildlife. · Efforts to contain the water were initiated immediately mad appear to be. completely .successf'uily. No fluids reached the tundra.. · The ARCO's Incident Management Team, Alaska Clean Seas m~d ARCO's Spill Response Team continue to respond and arc maintaining 24 hr support. Current. on-site response manpower is approximately 15 down from a peak of about 50. ' · Fluids have been disposed of at approved disposal facilities. Approximately 12,1 i0 bbls have been distx~sed, and 6,100 bbla arc contained in the pit. These. estimates, based on actual truck volumes and pit survey, represent the total water flow to surface to date. · A waste management plan for .,solids ('ice and sediment) has been complcted and will be review'.',xt by agency and ATO personnel. Work 'by heavy e' ' commence today. · qmpment m the reserve pit is expected to · All downhole activities that inject into the same underground tbrmation as the Grind and Inject muds and cuttings disposal (6,000 feet )and Cretaceous injection at Flow Station #2 (6,000 feet)' were halted on 3/17 and remain halted. As of 3/21,' following successl'ul mechanical integrity tests, water injection wells wl'dch inject into a different fora:ration at 9,000 ['eet, lmve been returned to service at normal injection rates. Well 4-17 (the immediate offset to Well 4-19 G&I) remains shut- · - Prodwction wells in the innnediate area remain shut down. · Flow samples have be~n taken to lab k~r testing to. determine ct~mposition and source. Results confim~ no gas or oil present and suggest recovered fluids are ,seawater which is used for local wat~rflood and Grind and Inject facility. · DS4 is the site of the large scale grind and inject project, l:'rudho¢ operators am reclaiming contents of reserve pits, grinding, mixing with'water and injecting at depth of 6,000 feet. · A PBU well diagnostics ~mn continues to evaluate the a?t:ropriate testing needed to determine the cause of this hxcident. Diagno.~tic$ have been initiated to detcrtrdnc well mechanical "f. ailure and/or formation communication. Well diagnostic work is continuing on a 24 hfs per day schedule. · Appropriate state and federal agencies have been notified. END SENT BY :PRUDHOE 6.4Y · 3-2!-I~7 · 10:07 · ARCO ENVIRON~!ENTAL--. I~076582717;# Drill Site 4 Fluids to Surface . Update 3121197, 08:00 hr. · Curwntly, no measurable flow of ~awater is delectable from any singl6 location on Drill Site - 4 in the Pnxlhoe Bay oil riel& Sump locations arc. periodically drained as water accumulates. · Contingency plans have hecta:developed addressing potentially varying conditions. · No injuries lax,, be~n ~~ with this ovent. Ther~ h~ [~¢n no imp~t to wildlife. · Effort~ to contain the water were initiated immediately and successfully contained lo the Drill Site pad and pit. No fluids reac~d the: tundrs. Additional clews are on standby to regover water ahould flow increase. Leak locations ,a0d extent of spill are being monitored asin$ aerial infrared detection. · The ARCO' s Incident Management Team, Ala/ka Clean Seas and ARCO's Spill Response Team continue Io respond and are maintaining 24 hr support. Current on-site response manpower is approximalely 20 down from ii peak of about 50. · Fluids are being disposed of at approved (lisposal facilities. Approximately 11,940 bbls have been disposed, and 6,1tX) bbls are contained in the pit and a small volume remains in the vac track. These cstimates, basext on actual euck volumes and pit survey, represent the total water flow lo surface to date. · All down.bo~ injection activities in the vicimty of Drill Site 4 were halted on 3/17, {Waterflood injection (9;0{10 feet), Grind and Inject muds and cuttings disposal (6,000 feet ) and Cretaceous injection at Flow Station #2 (6,000 feet)}, As o,c 3/21, produced waist injection wells have been returned to service at. non'ual injection rates. · Production wells in the immediate area mrna. in shut down. ', · Flow samples have been taken to lab for testing to determine composition and source. Results confirm no gas or oil present arid suggest recovered fluids are seawater which is used for local waterflood and Cnind and Inject facility. · DS-4 Ls the site of the. largo s~ale, grind. . and. inject project. .Prudhoe. operators axe reclaiming contents of reserve ptts, grinding, m~xmg w:th water and injecung at depth of 6,000 feet. · A PBU well diagnostics team'continuas to evaluate the appropriate testing needed ~.o determine thc cause of 'this incident. Diagnostics have been initiated to ~ietermme well mechanical failure and/or formation communication. Two well diagnositc units are on,site and operating 24 hfs per day. · Appropriate state and federal agencies have been notilied. Note: Given the current stable conditions, no updates are planned for the weekend. The next update will be provided Monday morning, 3/24/97. ~En'l' BY'P~UDHOE BAY : 3-20-~7 ' 8:$~ ; 0076802717;# 2/ ~ Drill Site 4 Fluids to Surface - [lpdate 3120/97, 06:00 hr. · Currently, no measurable flow of seawater is being detected on Drill Site - 4 in the Pmdhoe Bay oil field. · Contingency plans have been developed 'addressing potenti,,tlly varying conditions. · No injuries have been associated w. itt'~ this event. There has been no impact to wildlife. · Effo.qs to contain Uhe water wet~ initiated iznmediately and successfully contained to the Drill Site pad and pit. No fluids reached the tundra. Crews are on standby to recovering water should flow return. Leak locations and extent of spi. II am ~ing monitored using ,'mlial infrared detection, · The ARCO',,, Incidem Management Team, Alaska Clean Seas and ARCO's Spill Response Te~un continue to respond and are maintaining 24 hr support. Current on-site response manpower is apprvximat¢ly 23 down from a peak of about 50. · Fluids ,are being disposed of at approved disposal thcilities. Approximately 11,900 bbls have been disposed and 6,100 bbla have been contained in the pit. These estimates, based on actual truck volumes and pit survey, represent the total water flow to surface to d ate. · All downhole injection activities in the vicinity of D~511 Site 4 were halted on 3/17. {Waterflood iaiection (9,000 feet), Grind and Inject muds and cuttings disposal (6,000 feet ) and Cretaceous injection at Flow Station//2 (6,000 feet)}. Produced water injection wells have been put into ~ervice at minimum injextion rates for freeze protection. · Production wells in the immediate area have been shut down. · Flow samples have been taken 'to lab for testing to detem~h~ composition and source, Resulls confirm no ga~ m' oil pre.~ent and suggest recovered fluids ate seawater which is used for local watcrflood and Grind and Inject facility. · DS4 is the site of the large .qc~e grind and inject project. 'Pmdhoe operators are rcclaiming contents of reserve pits, grinding, mixing with water and injecting at depth of 6,000 feet. · A team is ev',duating the appropriate well diagnostics needed to determine the cause of this incident. Diagnostics have been .initiated to determine well mechanical failure and/bt formation commumcation. · Appropriate state and federal agencies have been noti fled. END Drill Site 4 Fluids to Surface- Update 3/19/97, 06:00 hr. · Water was flowing to the surface around nine wells on Drill Site - 4 in the Prudhoe Bay oil field midday 3/17. Flow, initially estimated at up to 20 barrels per minute, continues at an approximate rate of 2 barrels per minute, and continues to decrease. · Contingency plans have been developed addressing potentially varying conditions. · No injuries have been associated with this event. There has been no impact to wildlife. · The flow was discovered by a technician. This discovery occurred about the time water began to appear on the surface. · Efforts to contain the water were initiated immediately and successfully contained to the Drill Site pad and pit. No fluids reached the tundra. Crews are in the process of recovering water with vacuum trucks. Recovery is keeping up with flow. Leak locations and extent of spill are being confirmed using aerial infrared detection. · The ARCO's Incident Management Team, Alaska Clean Seas and ARCO's Spill Response Team continue to respond and are maintaining 24 hr support. Current on-site response manpower is approximately 20 down from a peak of about 50. · Fluids are being disposed of at approved disposal facilities. Approximately 11,400 bbls have been disposed and 6100 bbls have been contained in the pit. · ~All downhole injection activities in the vicinity of Drill Site 4 were halted on 3/17. {Waterflood injection (9,000 feet), Grind and Inject muds and cuttings disposal (6,000 feet ) and Cretaceous injection at Flow Station #2 (6,000 feet).} Wells have been cycled on and off injection for a short time at minimum rate for freeze protection. · Production wells in the immediate area have been shut down. · Source of water is under evaluation. Samples have been taken to lab for testing to determine composition and source. Results confirm no gas or oil present and suggest recovered fluids are seawater which is used for local waterflood and Grind and Inject facility. · DS-4 is the site of the large scale grind and inject project. Prudhoe operators are reclaiming contents of reserve pits, grinding, mixing with water and injecting at depth of 6,000 feet. · We are currently evaluating the appropriate well diagnostics needed to determine the cause of this incident. While injecting freeze protect fluid in well 4-19 .Tuesday afternoon, surface flow rates increased indicating a communication channel to the surface. Efforts are underway to determine if well mechanical failure or formation communication is the cause. · Appropriate state and federal agencies have been notified. END Drill Site 4 Fluids to Surface - Update 3/18/97, 06:00 hr. · Water was flowing to the surface around nine wells on Drill Site - 4 in the Prudhoe Bay oil field midday 3/17. Currently, the vast majority of the flow is associated with a single source near well 4-.19. Flow, initially estimated at up to 20 barrels per minute, continues at an approximate rate of 10 barrels per minute, and continues to decrease ( 5 barrels per minute at 10:00AM). · Contingency plans have been developed addressing potentially varying conditions. · No injuries have been associated with this event. · The flow was discovered around noon 3/17/97 by a technician. This discovery occurred about the time water began to appear on the surface. (No surface water as he entered trailer, surface water when he emerged 10 minutes later.) · Efforts to contain the water were initiated immediately and successfully contained to the Drill Site pad and pit. No fluids reached the tundra. Crews are in the process of recovering water with vacuum trucks. Recovery is keeping up with flow. Leak locations and extent of spill are being confirmed using aerial infrared detection. · The ARCO's Incident Management Team, Alaska Clean Seas and ARCO's Spill Response Team continue to respond and are maintaining 24 hr support. · Fluids are being disposed of at approved disposal facilities. Approximately 4700 bbls have been disposed and 6300 bbls have been contained in the pit. · All downhole injection activities in the vicinity of Drill Site 4 have been halted. {Waterflood injection (9,000 feet) and Grind and Inject muds and cuttings disposal (6,000 feet ). Cretaceous injection at Flow Station #2 (6,000 feet).} · Production wells in the immediate area have been shut down. · Source of water is under evaluation. Samples have been taken to lab for testing to determine composition and source. Initial results confirm no gas or oil present and suggest recovered fluids are seawater ( used for local waterflood and Grind and Inject facility). · DS-4 is the site of the large scale grind and inject project. Prudhoe operators are reclaiming contents of reserve pits, grinding, mixing with water and injecting at depth of 6,000 feet. · Appropriate state and federal agendes have been notified. END Drill Site 4 Talking Points # 1 and Agency Update 3/17/97, 20:00 hrs · Water is flowing to the surface around nine wells on Drill Site - 4 in the Prudhoe Bay oil field. · No injuries have been associated with this event. · The flow was discovered today around noon 3/17/97by a technician. This discovery occurred about the time water began to appear on the surface. (No surface water as he entered trailer, surface water when he emerged 10 minutes later.) · Efforts to contain the water were initiated immediately. Thirty minutes later, water was discovered adjacent to additional wells from those initially showing leakage. Water has been confined to the pad. We are confirming leak location by using aerial infrared detectors. · Alaska Clean Seas and ARCO's Spill Response Team has responded to the incident. · Crews have constructed berms of snow and ice and are removing water with vacuum trucks. · All downhole injection activities in the vicinity of Drill Site 4 have been halted. Waterflood injection (9,000 feet) and Grind and Inject muds and cuttings disposal (6,000 feet ). Cretaceous injection at Flow Station #2 (6,000 feet). · Production wells in the immediate area have been shut down. · Source of water unknown. Seepage continues at approximate rate of 10 to 20 barrels per minute. Samples have been taken to lab for test4ng to determine origin. No gas or oil are present. · Cause of leakage unknown. Will investigate all possibilities. · DS-4 is the site of the large scale grind and inject project. Prudhoe operators are reclaiming contents of reserve pits, grinding, mixing with water and injecting at depth of 6,000 feet. ° Project has been up and running 3 years. To date, have disposed of 400,000 cubic yards of material. Injecting up to 30-35,000 bbls of water, muds and cuttings per day during winter months. · Grind and inject project includes extensive monitoring program. No reason to expect problems, based on results of that monitoring program. Will re-examine in light of today's incident. ° Appropriate state and federal agencies have been notified. END Anchorage, Alaska Erin M. Oba Phone 265-6523 pro Ple,~se. d,'s~",l pr'evioo$ &rr"o r RECEIVED ::..i:'~ ,3 1997 Alaska Oil & Gas Cons. Commissr~ Anchorage STATE OF ALASKA AL^$KA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS · Operations performed: Operation Shutdown _ Stimulate__ Plugging _ Perforate _ Pull tubing _ Alter casing _ Repair well _ Other _X 2. Name of Operator: 15. Type of Well: ARCO Alaska, Inc. I Development_ 3. Address: Exploratory_ P.O. Box 100360 Stratagrapic_ Anchorage~ AK 99510-0360 Service _x 4. Location of well at surface: 916' FSL, 258' FWL, Sec 26, T10N, R15E, UM. At top of productive interval: 916' FSL, 258' FWL, Sec 26, TION, R15E, UM. At effective depth: At total depth: 916' FSL, 258' FWL, Sec 26, TION, R15E, UM. 2. Present well condition summary Total Depth: measured 7000 feet Plugs (measured) true vertical 7000 feet Effective Depth: measured 6250 feet Junk (measured) true vertical 6250 feet 6. Datum of elavation (DF or KB feet): 73' RKB 7. Unit or Property: Prudhoe Bay Unit 8. Well number: 4-19i 9. Permit number/approval number: 88-24 / 96-186 O. APl number: 50-029-21791 1. Field/Pool: Prudhoe Bay Oil Pool Fill @ 6250' MD (12/21/96). Casing Length Size Cemented Measured depth True vertical depth Conductor 80' 20" 2150# Poleset 115' 115' Surface 2952' 13-3/8" 2500 Sx CS III & 2984' 2984' 600 Sx CS II Production 6958' 9-5/8" 1350 Sx Class G & 6993' 6993' 300 Sx CS I Scab Liner 2924' 4-1/2" 65 Bbls Class G 5895' 5895' 'erforation Depth measured 5930 - 5950'; 5962- 5984'; 5990 - 6020'; 6072 - 6080'; 6100- 6138'; 6155 - 6172'; 6246 - 6388'; 6394 - 6404'; 6434- 6484'; 6494 - 6514'; 6562 - 6602'; 6712- 6732'; 6798 - 6842'; 6868 - 6882' true vertical TVD's are the same as the MD's listed above. Tubing (size, grade, and measured depth) 7",26#, L-80, PCT @ 2993'MD; 5-1/2",17#,L-80PCT @ 3110'MD. ~[~ E~'~' E I ME [ Packers and SSSV (type and measured depth) Baker FB-1 Packer @ 3004' MD; Baker FAB 85-47 Packer @ 2936' MD; Camco Bal-O SSSV @ 2210' MD. ,, 3 1997 Alaska 0ii & 6as Cons. Corn[' 13. Stimulation or cement squeeze summary Intervals treated (measured) Intervals treated (measured) see attached ORIGINAL Anchorage 14. Prior to well operation OiI-Bbl Shut In Subsequent to operation 5. Attachments 116. I Copies of Logs and Surveys run _ Daily Report of Well Operations _X Oil _ Gas _ 17. I hereby certify that the foregoing is true and correct to the best of my knowledge· Signed ~'~ '~. ~¢'¢~/ Title: Engineerirl~l Supervisor Form 10-404 Rev 06/15/88 Representitive Daily Average Production or Injection Data Gas-Mcf Water-Bbl - 36162 . Casing Pressure Tubing Pressure Status of well classification as: Suspended _ Service _X SUBMIT IN DUPLICATE ~' ' STATE OF ALASKA ALASr,,/-toIL-AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: operation shUtdoWn ' Stimulate ,L, ' Plugging Perforate ' ' Pull tubing , , Alter casing L, Repair well Other 2. Name of Operator ARCO Alaska, Inc. 3. Address P.O. Box 100360, Anchorage, AK 99510-0360 4. Location of well at surface 916' FSL, 258' FWL, Sec 26, T1 ON, R15E, UM At top of productive interval 916' FSL, 258' FWL, Sec 26, T1ON, R15E, UM At effective depth At total depth 916' FSL, 258' FWL, Sec 26, TION, R15E, UM 5. Type of Well Development ,,, Exploratory Stratigraphic Service ,X , 6. Datum of elevation(DF or KB) 73 RKB 7. Unit or Property Prudhoe Bay Unit 8. Well number 4~19i '9. Permit number/app'r°vai nubble" 88-24 / 96-186 10. APl number 50 - 029-21791 11. Field/Pool Prudhoe Bay Oil Pool feet 12. Present weld condition summary Total depth: measured true vertical Effective depth: measured true vertical Casing Length Conductor 80' Surface 2952' Production 6958' Scab Liner 2924' 7000 feet 7000 feet Plugs(measured) Fill @ 6250' MD (12/21/96). 6250 feet 6250 feet Junk(measured) Size Cemented Measured depth True vertical depth 20" 2150# Poleset 115' 115' 13-3/8" 2500 Sx CS III & 600 Sx CS II 2984' 2984' 9-5/8" 1350 Sx CIG & 300 Sx CS I 11226' 8659' 4-1/2" 65 Bbls Class G 5895' 5895' Perforation depth: measured 5930-5950'; 5962-5984'; 5990-6020'; 6072-6080'; 6100-6138'; 6155-6172'; 6246-6388'; 6--"~"~-6404'; 6434-6484'; 6494-6514'; 6562-6602'; 6712-6732'; 6798-6842'; 6868-6882____.,' true vertical TVD's are same as MD's above. Tubing (size, grade, and measured depth) 7", 26#, L-80, PCT @ 2993' MD; 5-1/2", 17#, L-80, PCT @ 3110' MD. Packers and SSSV (type and measured depth) Baker FB-1 Packer @ 3004' MD; Baker FAB ,.~7 Packer @ 2936' MD; Camco Bal-O SSSV @ 2210' MD. ~ ... i~'~ll ~"--' 13. Stimulation or cement squeeze summary Intervals treated(measured) see Attached Treatment description including volumes used and final pressure Representative Daily Averag ,~__'~t~...~i~n~]'on Data OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure 14. Tubing Pressure Prior to well operation 36162 Subsequent to operation Shut In 15. Att~tchments I Copies of Logs and Surveys run I 16. Status of well classification as: Daily Report of Well Operations ~ I Oil .. Gas .. Suspended ~ Service Injector , , , , , 'i 71"' i'hereby certii~ that the foregO)lng is true and correct to th~ best of my knowledge. ",Signed ._"~4,~ '~. ~ Title Engineering Supervisor Date /-¥ - ~' '~.. ~orm 10-404 Rev 06/15/88 SUBMIT IN DUPLICATE 4-19i DESCRIPTION OF WORK COMPLETED 4-1/2" SCAB LINER INSTALLATION 4/7/96' Performed an IPROF which showed the squeezed perf interval at 5622 - 5627' MD was leaking. 5/31/96- Tagged PBTD at 5628' MD. .... w/fill All open= perforation intervals (between 5930 - 6882' MD) covered 6/1/96' RIH w/video camera & saw a casing split at 5626' MD. POOH w/camera. Rigged down. 6/12/96' RIH w/perforation guns & shot percussion perforations (to observe response in observation well geophones) at: 5617 - 5622' MD (Cret) Ref. Log: BHCS 4/6/88. Used a 2-1/8" carrier & shot perfs at 4 spf at zero degree phasing at overbalanced pressure. RD. 6/14/96' Performed a Borax PNL which showed a channel present from casing split up to about 5524' MD. 9/14/96' MIRU CTU & PT equipment. MU & RIH w/milling BHA & milled 4.455" XN Nipple at 3098' MD to 4.75" ID. RIH to tag PBTD at 5615' MD. POOH w/BHA. RIH w/nozzle & jetted through fill w/biozan to 5640' MD; could n~t get deeper. POOH w/CT. RIH w/LIB & sat d~'n"at ~5'~'MD':' ~POOH w/LIB ~howing par~'cl"~h~: Ri~d down. 1 0/8/9 6 · RIH & tagged PBTD at 5634' MD. 1 I/2/9 6 · RIH w/LIB & sat down at 5502' MD. POOH w/LIB picture of parted casing. RD SLU. MIRU CTU. MU & RIH w/tapered mill BHA. Mil~-d'-pas~ 9~5/8" casing tight spots at 5538 - 5540' MD and at 5616' MD. Milled fill while circulating biozan to 5656' MD. Backreamed tight spots & POOH minus entire milling BHA. RIH w/overshot. Couldn't work past 5048' casing collar. POOH w/overshot. Made additional runs w/overshot BHA's; no recovery of fish. 1 1/3/96' Made runs w/overshot fishing BHA's. Tagged obstruction at 5538' MD. No recovery. RDMO CTU. I I/8/9 6 · MU & RIH w/fishing BHA. Latched & jarred fish free. POOH w/fish. RD. 11/1 MIRU 5509' POOH O~96 · CTU & PT equipment. RIH w/4.75" milling BHA. Dressed off top of 5-1/2" tubing tail at MD, then milled through 5-1/2" tubing, cement sheath, and fill down to 5940' MD w/biozan. w/BHA. Rigged down. JAN 0 7 1997 Alaska 0il & Gas Cons. Commission Anchorage 4-19i DESCRIPTION OF WORK COMPLETED 4-1/2" SCAB LINER INSTALLATION 2 I 1/1 1196- RIH & tagged PBTD at 5978' MD. I I/1 6/96' ~ RIH w/CT to tag PBTD at. 5940! ~MD. PU & pumped 20 bbls of gelled sand slurry containing 3500 lbs of 20/40 mesh sand, to place a sand plug to 5900' MD. POOH w/CT. Rigged down. 1 I/1 7/96' RIH & tagged top of sandplug at 5915' MD. 1 I/22/96- MIRU CTU & PT equipment. I I/23/96- Pumped 375 bbls of 9.5 ppg Brine to kill well. MU & RIH w/4-1/2" Scab Liner assembly. I I/24/96: Landed the Scab Liner on sand plug at 5895' MD. Pumped 65 bbls of Class G cement to set the liner at 2971 5895' MD across the 9-5/8" casing split & leaking squeezed perfs at 5626' MD. Released liner & POOH. PU & RIH w/liner top packer/seal assembly & stung in to set the packer at 2936' MD. POOH. ..¢~y-' ~','~. ,',,, '~"~ L~7 "- RIH w/milling BHA & milled liner cement to 5847' MD. POOH w/BHA. RIH w/milling BHA. I I/2 7/9 6 · Milled through liner cement to sand plug at 5895' MD, then washed through sandplug & fill w/biozan to 6600' MD (to uncover some of the open perf intervals between 5930 - 6882' MD). I I/2 8/9 6 · RIH & tagged PBTD et~6582' MD. I 2/1 9~96' RIH & tagged PBTD at~82' MD. I 2/2 I/9 6 ' ..... '~ ~ RIH w/CT & jetted a fill cleanout w/biozan to~.~6250'~ ..,~,., .~,~.. MD. Currently the well is Shut In & awaiting future Grind & Inject slurry materials for injection. STATE OF ALASKA .~--. ALASKA AND GAS CONSERVATION CO ,SSION APPLICATION FOR SUNDRY APPROVALS 1. Type of Request: Abandon Suspend Operation shutdown Re-enter suspended well Alter casing Repair well Plugging Time extension Stimulate Change approved program Pull tubing Variance Perforate 2. Name of Operator ARCO Alaska, Inc. 3. Address P.O. Box 100360, Anchorage, AK 99510-0360 4. Location of well at surface 916' FSL, 258' FWL, Sec. 26, T10N, R15E, UM. At top of productive interval 916' FSL, 258' FWL, Sec. 26, T10N, R15E, UM. At effective depth At total depth 916' FSL, 258' FWL, Sec. 26, T10N, R15E, UM. 5. Type of Well Development Exploratory Stratigraphic Service X Other X, 6. Datum of elevation(DF or KB) 73' RKB feet 7. Unit or Property Prudhoe Bay Unit 8. Well number 4-19/ ~- 9. Permit number 88-24 10. APl number 50 - 029-21791 11. Field/Pool Prudhoe Bay Oil Pool 12. Present well condition summary Total depth: measured true vertical 7000 feet 7000 feet Effective depth' measured 5626 feet true vertical 5626 feet Casing Length Plugs(measured) PBTD Tagged @ 562(~ ~'['419v. E D Junk(measured) Size Cemented SEP 1 9 199 Alaska 0il & G~.s Cons. C~mmissio,~ Measured depth A~~rCaI-Eepm Conductor Sudace Production Perforation depth: 80' 20" 115' 115' 2952' 13-3/8" 2984' 2984' 6958' 9-5/8" 6993' 6993' measured 5930-5950'; 5962-5984'; 5990-6020'; 6072-6080'; 6100-6138'; 6155-6172'; 6246-6388'; 6394-6404'; 6434-6484'; ~4~4-~14'; ~-~0~'; ~712-~78~'; ~7~8-~84~'; ~8~-~8~' true ve~ic~l 8~me ~s ~D's Iisle~ ~bove. 2150# Poleset 2500 Sx CS III & 600 Sx CS II 1350 Sx CIG & 300 Sx CS I Tubing (size, grade, and measured depth) 7", 26#, L-80, PCT @ 2993' MD; 5-1/2", 17#, L-80, PCT @ 3110' MD. Packers and SSSV (type and measured depth) Baker FB-1 Packer @ 3004' MD; Camco BaI-O SSSV @ 2210' MD. 13. Attachments Description summary of proposal x Detailed operations program BOP sketch x 14. Estimated date for commencing operation 15. Status of well classification as: September 30, 1996 16. If proposal was verbally approved Oil Gas Suspended Name of approver Date approved Service Injector 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Q,., Signed '"~~ /~, (~VE./ Title Engineering Supervisor Date FOR COMMISSION HRE ONLY Conditions of approval: Notify Commission so representative may witness Plug integrity BOP Test v~ Location clearance Mechanical Integrity Test Subsequent form required 10- ~O ~, Approved by order of the Commissioner Original Signed By David W. Johnston Form 10-403 Rev 06/15/$8 SLW cc: JWP. Approved Co · ,.., , ,~ i i__mm.ss.oner .... '3 :',,:;- '? J Approval No. ~'(o_/~ 6 Date SUBMIT IN TRIPLICATE DS 4-19i Scab Liner Installation Intended Procedure Objective- Install a 4-1/2" liner to isolate leakinfg squeeze perfs from injection. Return well to injection. Intended Procedure- · RU CTU and clean out fill to ~ 5900' · Mill out the 5-1/2" XN nipple to 4.75".' · Run and cement 4-1/2" liner and hang off from the 7" tubing. Mill out cement from liner and clean out 9-5/8" casing below liner to TD. RECEIVED SE? 1.9 1~9~ Alaska Oil & 6,,~s Cons. Commission A[lo, ,O. c.U,~ September 18, 1996 3£" - 72¢ csg Expansion Joi~ 9 5~8" X 5 1,f'2" Packer Squeeze Perfs 5822-27' 9 5¢'8" - 47# csg 7" SSSV Nipple 7" X 5" Liner Top Packer 7" X 5" Liner Hanger 5 1 ~" 17# Tubing Tail 5 lr2_" XN Nipple 4 1,¢2'' 15.1# Tubing Ceme~ ~ Perfs 5930'~ 6228' Fill C T Drilling Wellhead Detail Alignment Guide Flange, 7-1/16", 5M Ram Type Dual ~" ~ Gate BOPE Flanged Fire Resistant Manual Valve Kelly Hose To Dual \ ChokeManifold \ ~~.._._~ Stuffing Box (Pack-Off), 10,000 psi Working Pressure Offs 7' WLA Quick I I Connect ~ I _ _ J il I ~ Annular BOP (Hydril),7-1/16" ID 5,000 psi working pressure I 2-7/8" Blinds 2-7/8" Slips/Pipe rams Manual Valves Drilling spool 7-1/16", 5M by 7-1/16", 5M Ram Type Dual Gate BOPE Manual over Hydraulic 7-1/16" ID with 4-1/2" Pipe/Slip Rams 0.458' (5.5") Manual Master Valve 2" Pump-In ~Tubing Hanger \ Fire Resistant Kelly Hose to Flange by Hammer Up 1/4 Turn Valve on DS Hardline 10' from Tree 9-5/8" Annulus 13-3/8" Annulus Mud 60/40 I Trplx ] Shop Fuel Water Boilers Pump Room Ext. / Pipe rack/ Preferred Major Equipment Layout for DS 4-19i Dowell Drilling Equipment Trailer GeoQuest 500 W, International Airport Road Anchorage, AK 99518-1199 ATTN: Sherrie NO. 10047 Company: Alaska Oil & Gas Cons Comm Attn: Larry Grant 3001 Porcupine Drive Anchorage, AK 99501 3/1/96 Field: Prudhoe Bay Floppy Well Job # Log Description Date BL RF Sepia Survey Performance Disk Calculation Letter .~'.S. 3-33 '~H'-. JJO coMPENSATED NEUTRoN LoG-cNT-D ..... '96021"4 "'1 ................. D.S. 4-19 ......o~ ~ - I3 ~.'{: ~DUAL BURST TDT-P .... 9 6..0 2 0 9 ... I 1 D,S. 4-26 ~>5-- ~[q LEAK DETECTION LOG 960127 1 ... 1 D.S. 5-4 -7 H .. 0 ?q ~DUAL BURST TDT-P 9601 29 I I ....... D.S. 5-25 o~'--IP.I iDUALBURSTTDT-P 960126 I 1 D.,Si 14~i0 ~'(~,--I~ ! DIGITAL ENTRY & FLUID IMAGiNG. , 960215 .... 1 'i ....... , ........ i,D:,S.., 1.,4-!0 ~ - J~,~ PRODUCTION PROFILE ... 960_21 5 1 1 . . ....... 'D.S. 18-30 °l ~' -- 0¢1 STATIC PRESSURE SURVEY 960130 I 1 ........................... D;,S.~ 18-33 .......... ,,q,~,- (c/,,~ STATIC PRESSURE SURVEy .......... 960130 ....... I I ..... ................ ...... Please sign and return one copy of this transmittal to Sherrie at the above address. Thank you. ~xr~ O i 1996 Oil & Gas Cons. C~, t,ssio~ Anch0mf!~ GeoQuest 500 W. International Airport Road Anchorage, AK 99518-1199 ATTN: Sherrie NO. 9930 Company: 12/15/95 Alaska Oil & Gas Cons Comm Attn: Larry Grant 3001 Porcupine Drive Anchorage, AK 99501 Field: Prudhoe Bay Floppy Well Job # Log Description Date BL RF Sepia DIR MWD Disk D.S. 4-13 -7 ~ ~) I INJEC PROFILE ........... 9 51 1 0 9 1 ........ I ......... !D.S. 4-17 '~ '~)..O. INJECPROFILE 951118 . . .1 1 D.S. 4-19. ..~'¥' ~-~ DU.ALBURSTTDT-P 951112 I 1 D.S. 4-28. ~'~' ~L~.~-~ INJECTION PROFILE . 951110 .1 . 1 ..... D-S. 5-4 ~ ~j~-~c~ PROD PRORLE ..... 951115 I 1 ...... D.S. 9-04A PROD PROFILE ........ 9 51 1 1 0 I I ........... D.S. 14-16 ~'[ ~'(~1'. PROD LOG WlTH DEFT 951107 I 1 D.S. 14-19 STI~, ~' PROD PROFILE 951119 I 1 .............. ~.s. ~-0~ ~ ~ ~ ~.~c~o.,.o~,~,o~ ~s ~ ~ ~ ~ ~ ~ , ,, D.S. 18-23A .~ ~ I~, LEAK DETECTION LOG 951114 1 1 ,, , , , · , i SIGNED:~__~ Please sign and return one copy of this transmittal to Sherrie at the above address. Thank you. GeoQuest 500 W. International Airport Road Anchorage, AK 99518-1199 ATTN: Sherrie NO. 9683 Company: 8/31/95 Alaska Oil & Gas Cons Comm Attn: Larry Grant 3001 Porcupine Drive Anchorage, AK 99501 Field: Prudhoe Bay Floppy Well Job # Log Description Date BL RF Sepia DIR MWD Disk "D.s. 4-19 TEMPERATURE/PREssuRE& , ,, 950811 1 I ' ' D.S. 6-8 ~...~ BAKER INFLATABLE BRIDGE PLUG 950812 ,, , ! , 1 D.S. 6-17 <:~'~... - ~1 ~'~ LEAK DETECTION LOG 950807 I 1 PRODUCTION PROFILI5 950802 I 1 D.S. 6-24 ~~ ~'(4~i." . ...... ~D.S. 9-4A 7~'"Z) :::)_/.~' CNTG 950819 I 1 !D.S. 9-41 C~ -'"7~lrL 'PRODUCT!0NpRoFiLE 950810 I 1 .......... :D.S. 11-25 j~"~ [ ~ CNTD 950811 I 1 D.S. 13-34 ~"'-J--~ ~ ,'~ ~ PRODUCTION PROFILE 950801 1 1 D.S. 1448 , , :/~/ ,. _~ STATIC BHP.SURVEY 950812 1 I , D.S. 15-12 ~ ! I ~'~ ~ BRIDGE PLUG SET RECORD . . . 9 5 0 8 0 5 1 1 ,, , ,, , Please sign and return one copy of this transmittal to Sherrie at the above address. Thank you. R C JV£D o OEP 0 1 DATE: Alaska 0ii & ~as Cons. C0mmissi0.n Anchorage 500 W. International Airport Road Anchorage, AK 99518-1199 \\ A'I'rN: Sherrie "~ Well ob # Date g Description NO. 9670 Company: 8/25/95 Alaska Oil & Gas Cons Comm Attn: Larry Grant 3001 Porcupine Drive Anchorage, AK 99501 Field: Prudhoe Bay Floppy BL RF Sepia DIR MWD Disk D.S. 4-19// 95291 CBT 950818 I 1 !D.S. 11-27/" / 95265 CNTG 950730 1 ,, '-, EFt r'i~ I-Il SIGNED: AUG 2 5 1995 Gas C~n$. Commission Please sign and return one copy of this transmittal to Sherrie at the above address. Thank you. GeoQuest 500 w. International Airport Road Anchorage, AK 99518-1199 ATTN: Sherrie NO. 9510 Company: Alaska Oil & Gas Cons Comm Attn: Larry Grant 3001 Porcupine Drive Anchorage, AK 99501 6/7/95 Field: Prudhoe Bay Floppy Well Job # Log Description Date Bi. RF Sepia DIR MWD Disk ~'LJ_ (~,~ 'D.S. ' 05-'16A 95111 SLIM1" MWD' GR ' '1~ 0794 .... ;I ~]-~ .... (~ D.~. 2.13A 95109 MWDGR ..... 022795 ....... ~" '~'..~, .~,/~ o° D.S. 4-16 ....... CNTD , , 052295 .. I '1' ' ' 4~'C~,'~/ D.S. 4-19 DUAL BURSTTDT-P 052895 I 1 ~'~/"~) D.S. 4-47 DUAL BURST TDT-P ..... 052595 I I " D.S. 6-7 CHEMICAL CUTTER RECORD 05 2795 I 1 D.S. 9-37 DUAL BURST TDT-P 052495 1 1 D.S. 18-20 PRODUCTION PROFILE 05 26 95 I 1 D.S. 15-14 'PERFORATION RECORD 052695 I i ,, ........... , ........ SIGNED: Please sign and return one copy of this transmittal to Sherrie at the above address. Thank you. RECEIVED DATE: JUN 09 1995 A~a ~ & aa~ Ca~s~ Commission iCIL~NICAL INTEGRITY REPOK% SPUD DA~Ei' ' ,,~/-~°/8~ OPEK & ~;IELD /4~ /~(~ RIG RELEASE:.' WELL NUMBER · FELL DATA TD, F~o .f~).. Fooo TVD! PBTDI g~oo fid ~oo TVD , 11 -- ~_ Casing, g~/~ ~ z u', Shoe TVD ! DV, MD -TVD Liner ~ Shoe I MD TVD ! TOP ~ MD TVD Tubing I 7j/.f'Q-t.- PaCker ~O O0 MD and ' llole Size TVDI Set: at 3_(c0 ! Perfs 4z4>-~ to ~~ ~_ flECILANICAL INTEGRITY - PART Annulus Press Test, IP ! 15 sin ! 30 sin Comments I · · · NECtlANICAL INTEGRITY - PART ~2 Cement Volumes, Amt. Liner.. , ! Csg /K3-O ~1~! DV , . Cst vol to cover perfs . . .. . Theoretical TOG Cement Bond Log (Yes or No). ~'~ ! In AOGCG File_~. / · CBL Evaluation, zone above perfs ..,..~..~,,~{f~- Produc.tion Log, Type I Evaluation .CONCLUSIONS~ Part tl, Part t2, rev. 05/20/87 ., C.02B ,...... _... STATE OF ALASKA ALAS . LAND GAS CONSERVATION ,vllSSlON REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown Stimulate Plugging Perforate X Pull tubing Alter casing Repair well Other X 2. Name of Operator ARCO Alaska, Inc. 3. Address P.O. Box 100360, Anchorage, AK 99510-0360 5. Type of Well Development Exploratory Stratigraphic Service 4. Location of well at surface 916' FSL, 258' FWL, Sec. 26, T11N, R15E, UM. RECEIVED At top of productive interval 916' FSL, 258' FWL, Sec. 26, T11N, R15E, UM. At effective depth M,~Y '~ 0 199~ 916' FSL, 258' FWL, Sec. 26, T11N, R15E, UM. Naska Oil & Gas Cons. Commission At total depth 916' FSL, 258' FWL, Sec. 26, T11 N, R15E, UM. 6. Datum of elevation(DF or KB) 60 RKB feet 7. Unit or Property Prudhoe Bay Unit 8. Well number 4-19 9. Permit number/approval number 88-24 10. APl number 50 - 029-21791 11. Field/Pool Prudhoe Bay Oil Pool 12. Present well condition summary Total depth: measured 7000 feet true vertical 7000 feet Effective depth: measured 6900 feet true vertical 6900 feet Casing Length Size Conductor 80' 20" Surface 2952' 13-3/8" Production 6958' 9-5/8" Plugs(measured) Junk(measured) Cemented 2150# Poleset 2500 sx CS III & 600 sx CS II 1350 sx Class G & 300 sx CS I Measured depth True vedicaldepth 115' 115' 2984' 2984' 6993' 6993' Perforation depth: measured 5930-5950'; 5962-5984'; 5990-6020'; 6072-6080'; 6100-6138'; 6155-6172'; 6246-6388'; 6394-6404'; 6434-6484'; 6494-6514'; 6562-6602'; 6712-6732'; 6798-6842'; 6868-6882' true vertical Same as above MD's Tubing (size, grade, and measured depth) 7", 26#, L-80, PCT @ 2993' MD, 5-1/2", 17#, L-80, PCT @ 3110' MD. Packers and SSSV (type and measured depth) Baker FB-1 packer @ 3004' MD; Camco BaI-O 2210' MD. 13. Stimulation or cement squeeze summary Intervals treated(measured) See Attached Treatment description including volumes used and final pressure 14. Prior to well operation Subsequent to operation Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure see attachment Tubing Pressure 15. Attachments Copies of Logs and Surveys run Daily Report of Well Operations 16. Status of well classification as: Oil Gas Suspended Service Injector 17. I herein' certify that the for~.rect to the best of my knowledge. Signed"~ ~' ~ Title Engineering Supervisor Form 10-404"Rev 06/15/88 AJB/FEB cc: KZ, JWP. Date ~/~~"~'"~ SUBMIT IN DUPLICATE__~, 4-19 DESCRIPTION OF WORK COMPLETED PRE-GRIND & INJECT CHANNEL CEMENT SQUEEZE RECEIVED I I / 2 1 / 9 4' MAY ] 0 199,5 Performed a Borax PNL, indicating a channel was present from 5930' up to 4500' MD. ,Uaska OU & G,u Cons. Commission 2 / 9 / 9 5: Allr, JI0ta~ ,.~!:~. & ~,.a..~gged PBTD a.t :6642, MD~: 2/12/95: MIRU CTU & PT equipment. RIH w/Inflatable Bridge Plug & inflated plug to set at 5750' MD, to isolate the open Cretaceous perforation intervals located between 5930'- 6882' MD. Sheared off plug & pumped 10 bbls gelled sand slurry containing 2200 lbs of 20/40 mesh sand on top of Bridge Plug, followed by 500 lbs of CaCO3 cap spotted on top of sand. POOH. RD. 2/13/95: RIH & tagged top of CaCO3 cap at 5719' MD. 2/1 7/95: RIH & tagged top of CaCO3 cap at 5853' MD, then RIH w/perf gun & shot squeeze perforations at: 5622 - 5627' MD (Cret) Ref. Log: BHCS 4/6/88. 2/1 8/95: RIH w/CT & pumped gelled sand slurry w/7800 lbs of 20/40 mesh sand to raise top of sand plug. POOH w/CT. Rigged down. 2/1 9/95: RIH & tagged sand top at 5655' MD. PT equipment & pumped 42 bbls Diesel to perform an Injectivity Test. MIRU CTU & RIH w/CT to reciprocate a pre-squeeze acid wash across the open perforations (listed above). Pumped 50 bbls of 1% NH4CI Water, followed by 10 bbls Xylene, followed by 54 bbls 12% HCI w/10% Xylene, followed by 34 bbls 6% HF - 0.75% HCI, followed by 109 bbls 1% NH4CI Water, followed by 34 bbls Diesel, followed by Shutdown. POOH w/CT. RD. 2/20/95 - 2/21/95: A Channel Cement Squeeze was performed as follows: MIRU CTU & PT equipment. Loaded the well w/Seawater, then RIH w/CT & pumped 45 bbls of Thixotropic cement w/no pressure bump. Hesitated squeeze pressure to 950 psi & placed 38 bbls of cement behind pipe. Mixed more cement & continued pumping 5 bbls Neat G Cement, followed by 30 bbls G Cement w/t0 ppb Aggregate, followed by 14 bbls G Cement w/0.5% Fibers, followed by Shutdown. Hesitated squeeze pressure to 1100 psi & placed an additional 46 bbls of cement behind pipe. POOH w/CT leaving a Fiber Cement plug in the wellbore w/estimated top at 5604' MD. RD. 3/2/95: MIRU CTU. RIH w/underreamer & reamed through cement from 5522' to 5611' MD. clean w/Biozan & Slick Seawater. POOH w/underreamer. PT well to 1500 psi; OK. Circulated RD. 3/7/95: MIRU CTU & RIH w/milling BHA. Milled cement to 5623' MD, then jetted out sandplug to solid obstruction at 5925' MD. Circulated clean & POOH w/milling BHA. Rigged down. 3/1 0/95: RIH w/IBP spear & attempted spearing Bridge Plug at 5901' WLM. Plug deflated & fell downhole to 0598' WLM. Could not latch Plug. POOH. MIRU CTU & RIH w/CT to wash the perforations located between 5930' & 6598' MD. Jet washed liner clean w/Slick Seawater & chased Bridge Plug downhole to 6700' MD. POOH w/CT. Rigged down. 4-19 DESCRIPTION OF WORK COMPLETED PRE-GRIND & INJECT CHANNEL CEMENT SQUEEZE 3/20/95: A Cretaceous Data Frac to gather Reservoir Grind & Inject response data, was performed as follows: MIRU & PT equipment. RU two bottom hole pressure gauges & RIH w/gauges to 5800' MD, then pumped a fullbore step rate test sequence as follows: a) 5 bbls Seawater @ 1 bpm, followed by b) 10 bbls Seawater @ 2 bpm, followed by c) 20 bbls Seawater @ 4 bpm, followed by d) 30 bbls Seawater @ 6 bpm, followed by e) 40 bbls Seawater @ 8 bpm, followed by f) 50 bbls Seawater @ 10 bpm, followed by g) 60 bbls Seawater @ 12 bpm, followed by h) 225 bbls Seawater @ 15 bpm, followed by i) Shutdown. Isolated the well & monitored pressure. Took 33 minutes to closure at 3200 psi. Resumed pumping: j) Repeat sequence of steps 'a' through 'i' (listed above). Isolated the well & monitored pressure. Saw closure at 3196 psi. POOH w/gauges. RD. 4/2/95: MIRU & RIH w/perforation gun to generate a seismic shock for Grind & Inject Observation well geophone testing/calibrations (geophones located in Well 4-12). Shot Reperforations at: 5995 - 6005' MD (Cret) Ref. Log: BHCS 4/6/88. Monitored good seismic observation picked up by geophones in observation well. POOH w/perforating gun #1. Noted all shots fired. MU & RIH w/perforating gun #2 & reshot the perforation interval (listed above). POOH w/perforating gun #2. Noted all shots fired. RD. 4/20/95: RIH & tagged PBTD at 6267' MD. The well is currently on 9.5 ppg slurry disposal injection. (w/bypass fluid included), is 22000 BWPD @ 1450 whp. Average injection rate & pressure RECEIVI D Alaska 0il i Gas Con& GeoQuest 500 W. International Airport Road Anchorage, AK 99518-1199 ATTN: Sherrie RECEIVED APR 1 2 995 Alaska 0ii & Gas Cons. Commission Anchorage NO. 9391 Company: 4/1 1/95 Alaska Oil & Gas Cons Comm Attn: Larry Grant 3001 Porcupine Drive Anchorage, AK 99501 Field: Prudhoe Bay Floppy Well Job # Log Description Date BL RF Sepia DIR MWD Disk D.s. 6-9" ~ 95055 CNTD 01 2395 1 ~iS. 4-35 '"'J' 9508'~ ..... i~U~,i" BURsT-TDT-P 02~)895 1 D.S. 14-3 ~'J 94187 REDO CNTD 032894 1 ...................... D.S. 2-16A '--J 95147 REDO MWDGR 102394 1 D.S. 1-06 "--J 94399 REDO DUAL BURST TDT-P 061394 1 D.S. 4-19 "'J 95106 DUAL BURST TDT-P 031795 1 ID.S. 9-36 BE'''-J 950.2.5...? MWDGR 101294 .... 1.. D.S. 1-06a"--.J cat 032495 I 1 D.S. 1-06A"--J CNTG "' 032495 I 1 D.S. 1-22A"'-J PERF RECORD 033095 I 1 D.S. 4-12'''''''~ CBT 032695 I 1 D.S. '~-12 ~ TUBG PUNCHER RECORD 032395 1 1 D.S. 6-8 ~ PERF RECORD 032595 I 1 D.S. 7-24 ""--J PERFRECORD 032695 I 1 D.S. 11-27 '"-J BASE LINE SURVEY 032395 I 1 ........ D...S. 9-36 EL"'J.. . MWD GR (MD) 1 021 94 I 1 .D.:S. 9-36 aL '"J MWD GR (TVD) 1 021 94 I 1 .......... D.S. 9-36 B.L. "'--.J IMWDGTF(MD) 102194 I 1.. ,, PLEASE NOTE: D.S. 14-3 REDO - ORIGINAL WAS MISSING FILE #4 D.S. 2-16A REDO - MERGED TWO PREVIOUS RUNS TOGETHER (JOB # 93560 & 93561) $1G~ED: .... DATE: Please sign and return one copy of this transmittal to Sherrie at the above address. Thank you. 3/29/95 GeoQuest 500 W. International Airport Road Anchorage, AK 99518-1199 ATTN: Sherrie NO. 9380 Company: Alaska Oil & Gas Cons Comm Attn.' Larry Grant 3001 Porcupine Drive Anchorage, AK 99501 Field: Prudhoe Bay Floppy Well Job # Log Description Date BL RF Sepia DIR MWD Disk D.S. 4-19 'DUAL BURST-TDT-P 032095 I 1 D.S. 4-19 USIT 031 795 I 1 D.S. 4-19 DUAL BURST-TDT-P 031795 I 1 D.S. 4-19 CBT 031 795 1 1 D.S. 9-47 PERF RECORD '" 031 9 95 I 1 · ,, ,,, · SIGNED' Please sign and return one copy of this transmittal to Sherrie at the above address. RECEIVED MAR 3 0 1995 _'rE: NaSkaDO~i & Gas Cons. Con~ni~lon Anchorage Thank you. GeoQuest 500 W. International Airport Road Anchorage, AK 99518-1199 ATTN: Sherrie NO.9296 Company: 3/2/95 Alaska Oil & Gas Cons Comm Attn: Larry Grant 3001 Porcupine Drive Anchorage, AK 99501 q(-G'7 qq-/o7 .. Field: Prudhoe Bay _ Floppy Well Job # .... .... Log Description Date BL RF Sepia Mylar Disk D.S. 1-.2~""~ LEAK DETECTION 021 995 I 1 D.S. 4-1~ TUBG PUNCHER RECORD 021895' I 1 D.S. ~;~"b~, RESERVOIR SATURATION 022195' I I i D.S. 4-19 PERF RECORD 021795 I 1 D.S. 4-~3~"-~ PERF RECORD 0'21995 1 1 D.S. 4-48~''') PERFRECORD 021395 I 1 , D.S. 6-3~-~ PRODUCTION LOG 022195 I 1 D.S. 7-4A",q PERF RECORD 021595 I 1 D.S. 9-2,~_~ INFLATABLE BRIDGE PLUG 021795 I 1 D.S. 9-11'~,3 PERF RECORD 021895 I 1 D.S. 9-45'"-,3' PERF RECORD 022095 I 1 D.S. 13-20~'~ INFLATABLE BRIDGE PLUG 021795 I 1 D.S. 11-4/t~.~ PROD PROFILE 022095 I 1 ,,, ,, D.S. 15-11-,~_~ PROD PRORLE 022095 I 1 D.S. 18-1~. ¥ . DUAL BURST TDT-P ..... 021895 I 1 D.S. 11-0~3 95058 DUAL BURST TDT-P 021195 1 D.S. -14--e4~- q5 95057 DUAL BURST TDT-P 020595 1 ,,,, Please sign. and return one copy of this transmittal to Sherrie at the above address. RECEIVED j~E: 3 !995 Alaska 011 & Gas Cons. Commission Thank you. Anchorage GeoQuest 500 w. International Airport Road Anchorage, AK 99518-1199 ATTN: Sherrie NO. 9250 Company: 2/13/95 Alaska Oil & Gas Cons Comm Attn: Larry Grant 3001 Porcupine Drive Anchorage, AK 99501 Field' Prudhoe Bay Floppy Well Job # Log Description Date BL RR Sepia Mylar Disk D.S. 14-24 ~o5-~'7 94248 CNTD 061594 I ...... .... D.S. 4-19 ~-~ 94395 DUAL BURST TDT-P 112194 1 ...... D,s.. 14-3 bz~:~~.~ 950.2.7 DuAL BuRst tDt-P 061594 1 D.S. 14-16 94336 DUAL BURST TDT-P 100494 1 -D.S. 1-22A {~ 9 5 0 2 8 CBT SONIC 01 1 2 9 5 1 ....... ,, ,,, ... SIGNED: Please sign and return one copy of this transmittal to Sherrie at the above address. RECEIVED D~,~ 1 4 1995 ~,tas~ 0ti & Gas Co~s. Commission Anchorage Thank you. ARCO Alaska, Inc. Date: September 20, 1994 P.O. Box 100360, ,~.,,¢horage, AK Transmittal #: 94111 99510,~ ~, Subject: ARCO Static Pressure Survey's From/Location: Telephone: To/Location' Karla Zuspan/ATO- 1529 (907) 263-4310 Distribution Log Date (M-D-Y) Tool Type iWell Number 04-19 04-45i 11-29i 12-07A j 12-10A 12-26 13-31 13-35 05-23-94 07-05-94 O7-O8-94 06-09-94 06-08-94 06-09-94 06-09-94 18-01 06-04-94 06-10-94 06-06-94 06-07-94 06-08-94 07-07-94 Pressure Survey Pressure Survey Pressure Survey Pressure Survey Pressure Survey Pressure Survey Pressure Survey Pressure Survey Pressure Survey Pressure Survey Pressure Survey IPressure Survey Pressure Survey Run Contractor I SCH 1 SCH SCH SCH 1 SCH SCH 1 SCH I SCH 1 SCH I SCH I SCH 1 SCH i SCH Number of Records: 13 Karla Zuspan Distribution: Central Files BPX State of Alaska Mobil Please le receipt b Phillips Exxon D&M 7,2 re1 Date: ~sm LI. ARCO Alaska, Inc. Is a Subsidiary of AtlatttlcRIchfleldCompany ARCO Alaska, Inc. Date: June 14, 1994 P.O. Box 100360.,....~nchorage, AK 99510.~~. Transmittal#: 94045 ~ ~' Subject' From/Location: Telephone: To/Location- ARCO Cased Hole Finals John E. DeGrey/ATO-1529 (907) 263-4310 Distribution Well Log Date Tool Type Number ~ (M-D-Y) o/q-?0I 1-10A ! 06-02-94 !f USIT I/L~ ! 2-33 i 05-22-94if CNL ,q. ::2I 3-18A i 05-19-94 1~ CCL L02. I 3-27 i 05-24-94 I/BAKER IBP REC i 05-26-94 i-' PERF REC !06-04-94 i/ INJ PROFILE 105-25-94iJ USIT ,]UN 2 0 1994 A!2.sk2 0!! & Gas 0ohs. Co,re. rnissior~ R un, Contractor i Scale 1, 5" SCH ~/-~- i 4-07ST 1,515 I 4-1lA 2-~ !4-19 lq~ i 4-46 (~:~'f~ i 5-3A 6-10 i 06-04-94 ~Production Profile 06-02-94 i-' CCL 06-03-94 i/' PERF REC 05-22-94 i/Patch Setting Rec i 06-05-94 ~/~ub~ing Puncher i , 5II , 5'1 , 5II , 5II , 5II , 5II 1,1"5" 1,5" 1 5" 1 5" SCH SCH SCH SCH SCH : SCH SCH i SCH SCH SCH SCH 6-22A 7-4A 7-6 i 7-7A 7-18 7-23 7-26 7-28 9-13 17_~ t 9-44 9-50 11-291 11-291 16-13 17-19 18-1 { 05-22-94 {.,," CNL i 05-21-94 ~ CNL 05-21-94 ~Production Profile 05-20-94 ! / Pref Rec 05-21-94 ]-- CNL 05-24-94 If CCL 05-21-94 tv Prod Profile 05-26-94 iv" Perf Rec 05-25-94 1." Bridge Plug 05-20-94 ~roduction Profile 05-20-94 l/Production Profile 05-31-94 t/ CNL 05-30-94! ~ USIT 11-291 11-291 11-35 11-35 11-36 14-3 14-12 i 14-12 14-20 i I 5" i 1 5" i 1 5" i 1 5" i 1, "5" 05-31:94 I ,,'" TDT.- ¢ 05-30-94 I /' CBT 05-31-94 ]~' USIT 05-31-94 1'" CBT 05-23-94 I,/ CBT 06-03-94 1 ~ PERF REC 05-28-94 1 '" GRLOG 05-28-94 t"Production Profile 06-01-94 i,-/ PERF EEC 06-01-94 i/' PERF REC 05-24-94i" Baker IBP Rec 06-05-94 ?' Leak Detection 05-26-94 I / PERF REC 06-04-94 P' Pack Off Gas Lift 06-04-94 t.-Tubing Puncher [ 1,5" 1,5" 1,5" 1 5" , 1,1"5" i 1 5" 1 5" 1 5" 1 5" 1 5" 1 5" 1 5" 1 5" 1 5" 1 5" · 1 5" 1 5" 1 5" 1,1"2"5" 1,5" 1,5" 1,5" SCH SCH SCH SCH SCH SCH SCH SCH SCH SCH SCH SCH SCH SCH SCH SCH SCH SCH SCH SCH SCH SCH SCH SCH SCH SCH SCH SCH ARCO AlasKa, Inc. Is a Subsidiary of AtlantJcRIchfleldCompany ARCO Alask~ Inc. P.O.Box 100360 Anchorage, Alaska 99510 DATE: 4-30-93 REFERENCE: ARCO ~/~- ~--1-9 4-16-93 1-~o~-' )"(.~' 4-11-93 ~1~93 ~31 ~q~ ~11~3 ~. ~ ~ -~19 ~&93 9-~ 95-~ ~1-93 ~28A _ 4-4-93 -14-34 4-12-93 14-41qi~-~tp 4-10-93 1~31 q~ ~93 AGI~ ~93 AGI-7 ~93 lO Inflatable IBP Setting Run 1, [~' Dual Burst TDTP 0)orax) l~m 1, Production Run 1, 5 Static Press/Temp Run 1, Perlr Record R,_m 1, Tubing Cutter Run 1, 5" Production Run 1, 2"&i~ Static Pressure/Temp Run 1, Peri Record Run 1, SHL/GR/CCL ~m 1, PFC/CC& (packer Setting) Run 1, Dual Burst TDTP/Temp (Borax) Run 1, Production Run 1, Dual Burst TDTP (Borax) Run 1, Dual Burst TDTP (Borax) Run 1, Production Run 1, Please sign and return tl~ attached copy a~ receipt of data~ Have A Nice Day! Sonya Wallace ATO-1529 # CENTRAL FILES # CHEVRON D&M # CLINT CHAPMAN # EXXON MARATHON # MOBIL RECEIVEDo e' APPROVED ~ ",-'" 1993 Trans# 9305 # P~~ PB ~~ ~ R&D ~ BPX ~ STATE OF ~~ ~CO Sch Sch Sch Sch Sch Atlas Sch Sch Sch Atlas Atlas Sch Sch Sch Sch Sch Atlas Atlas Atlas /? MECthMNICAL INTEGRITY REPORT OPER & FIELD RIG RELEASE' ~/08 ~-~'/~ k~LL NUMBER WELL DATA T'D: 7'~Oc_D MD $(4., Casing..~ q~ t. Shoe: 6993 MD TVDI PBTD, 6?00 MD ~ TVD ,, TVD! DV: MD -TVD Liner: Shoe: MD TVD; TOP: MD TVD Tubing: -~.~ Packer ~ood> MD TVDI Set at ~[IQ ttole Siz6~ and [Z~q~ Perfs ~5-Af , to ~29~Z MECHANICAL INTEGRITY - PART Annulus P'ress Test.. IP Comments -. ; 15 rain ; 30 rain MECHANICAL INTEGRITY - PART ~2 _~ement Volumes: Amt. Liner ~ Cs ~ DV $~C) . Theoretical TOC 6~"g-~~O '/~-'~ ':'-Z.~T67 -- ~O70 Cement Bond Log (Yes or No)~?F/¢~V ! In AOGCC File ,,>,~_.~ .. CBL Evaluation, zone above perfs .~~ ,~M. ! Produ¢.tion Log: Type Evaluation CONCLUSIONS: Part ~1: rev. 05/20/87 C.028 STATE OF ALASKA U ~ ~ ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS 1. Type of Request: Abandon__ Suspend Operation shutdown ~ Re-enter suspended well__ Alter casing..__ Repair Well Pluggingm ~me extension m Stimulate Change approved program _ Pull Tubing Variance Perforate Olher .. 2. Name of Operator ARCO Alaska Inc. 3. Address PO Box 100360 Anchorage, Alaska 99510-0360 , 12. Location of well at surface 916' FSL, 258' FWL, Sec. 26, T11 N, R15E, UM. At top of productive interval 916' FSL, 258' FWL, Sec. 26, T11 N, R15E, UM. At effective depth 916' FSL, 258' FWL, Sec. 26, T11 n, R15E, UM. At total depth 916' FSL, 258' FWL, Sec.26, T11 N, R15E, UM. Present well condition summary Total depth: measured true vertical 7OO0 7000 Effective Depth: measured 6900 true vertical 6900 5. Type of Well: Development Exploratory Stratigraphic.~ Service feet Plugs (measured) feet feet Junk (measured) feet 6. Datum elevation (DF or KB) 60' RKB feet 7. Unit or Property name Prudhoe Bay Unit · · 8. Well Number DS 4-19 9. Permit number 88-24/9-781 10. APl number 50-029-21791 11. Field/Pool . Tertiary/Cretaceous Undefined Casing Length Size Cemented Measured depth True Vertical depth Conductor 80' 20" Surf ace 2952' 13-3/8" P rod uctio n 6958' 9-5/8" Perforation depth: measured true vertical Tubing (size, grade, and measured depth) Packers and SSSV (type and measured depth) 2150# Poleset 115' 2500 sx CSIII & 600 sx CSII 2984' 1350 sx Clas G & 300 sx CSI 6993' See Attachment A See Attachment A 115' 2984' 6993' R'ECEIVED J UN 2 9 1992 7", 5-1/2", L-80, tubing w/tail @ 3110'Alaska 0ii & Gas Cons. Commissi~ Anchorage FB-1 pkr @ 3000' (WLM) & WRDP-2-BAL-S SSSV @ 2211' 13. Attachments Description summary of proposal ;K Detailed operations program BOP sketch 14. 15. 17. Signed Estimated date for commencing operation ! 16. Status Of well classification as: June 24, 1992 If proposal was verbally approved Oil. Gas Suspended__ June 24, 1992 Name of approver Blair Wonzell Service Water Disposal., Date approved June 24, 1992 I hereby certify that the foregoing is true and correct to the best of my knowledge FOR OOMMISSlON USE ONLY Date Conditions of approval: Notify commission so commission representative may witness Plug integrity BOP Test Location clearance Mechanical Integrity Test Subsequent form required 10-- Approved by order of the Commission Original Signed By David W. Johnston Form 10-403 Rev 06/15/88 JApproval No. ~pproved Copy Returned Commissioner Date'7 J (~,1 SUBMIT IN TRIP~IIO!TE Attachment A REPORT OF SUNDRY WElL OPERATIONS DS 4-19 Perforation Depth' Measured' True Vertical: 5930-5950', 6100-6138', 6434-6484', 6798-6842', 5930-5950', 6100-6138', 6434-6484', 6798-6842', 5962-5984', 6155-6172', 6494-6514', 6868-6882' 5962-5984', 6155-6172', 6494-6514', 6868-6882' 5990-6020', 6246-6388', 6562-6602', 5990-6020', 6246-6388', 6562-6602', 6072-6080', 6394-6404', 6712-6732', 6072-6080', 6394-6404', 6712-6732', RECEIVED JUN 2 9 1992 Alaska Oil & Gas Cons. Commission Anchorage Attachment B DS 4-19 Annular Communication Summary & Proposal June 24, 1992 Discussion Cretaceous disposal well. Currently taking pit dewatering fluid. Very small. Tubing X 9-5/8" pressure communication is present. · After bleeding down, it takes more than 1 week for the 9-5/8" pressure to slowly increase and equalize with the tubing pressure (1200 - 1300 psi). · At this time the leak is too small to find with conventional leak detection logging operations. 9-5/8" casing is Considered competent to liquid to 2000 psi (6/9/92). 9-5/8" pressure decline was 2% during the MIT operation (35 psi/30 minute test). Plan Maintain well on water injection service. Should leak worsen in the future, evaluate leak detection options. RECEIVED J UN 2 9 1992 Ataska Oil ~ Gas Cons. Commission Anchorage ARCO Alaska, Inc. - Prudhoe Bay Unit Notes to Form 10-406, February, 1991 I · Produced Water Disposal Well 4-~indicates an average casing pressure close to average tubing pressure. The pressure histories do not indicate there is a tubing to annulus communication problem at this time. Annular communication screening tests have been performed on Well 4-19 and have confirmed the mechanical integrity of the completion. t:;: Ii'.'; F:' E F;; E N E: Iii; ' A F;: C: 0 C A ;:/,' E D I"! O I... Ii!: F:' I i',! A I... ;!7 t .... t P, ?:; .... 'i '::' ..... :::' t f'~ ~"il t... ¢', F;,' /F:' Iii: F;,' F' i "2! 5: 2 .... 2 '7 ..... :J:' i F' F;:. O ).";' U C "f' ]: C] i",I F:' FL: C] F:' :1: t... E i .... 3; C':, :3 .... '7 ..... ¢' 'i F:' F;,' 0 IZ:' LJ C'1"/[ 0 N F:' I:;.: 0 I:: I I... El: S .... i '7 '"' 9 t C [Z)I... I.. r.".', R /F:' E I:;:. F:' (b/~,' ~, 2 .... 2 8 .... ':;;' i :1: N,..I F:' F;: C)F:' ]; I... E; '3 I: ' I:: ..... ..;. ..,, ."~ ..... i 6 .... (;' t Ct]) I... I... A F;..' / F:' Iii] F;..' F:' ':;' .... i ;2 ..:~ ....... .... :;." .... '::~. .... 'i F:' F;..' f'i I) L.I E: '1" t O i"'.! F:' I:;,' C)F:' ]Z I... l_-'i: '7'"' i 6 L'.;~ .... ~ii ..... ? i '1" E H F:' Ii"' F;,' A 'i" LI F;,' E ,". ...... ;.:, .'.'.!; ,. ..... c, t I... ~:.,.., I',. i) Iii; 'i" EZ C '1' I O i".l i 2 .... 2 :'4 .... ,'5 .... 9 i :1; N.....I F:' F;.: O F:' I I... Ii"' ! 2 .... i t ;.!; ..... i .... ':..;' i J::' F;,' [) D t.J C: 'f' I C! N. I::' I:;; (] F' I I... E i ''') '" ''') tS .... A ..... i.;;' i I N. I F:' F;..' O F:' :i: !... I.:.': 'i :3 .... 2;:: A :.'3 ..... I 9 ..... :.'.'.~ i I... Iii; A I< I.l, Ii!; 'f' E C'T' I 0 N ':': 'i ;'.'t "- '5 3 ..... i :iii "' :? i C O L_ L. R I";.: /F:' I!:' t;; F:' t 4 .... 4 L':!; .... i ':}) .... ::? t F:'I:;~ O i) LJ C T I O N F' R O F' I I... E t 4 .... t 2 1'3 ..... / (')"- 9 i J Ii:' W I:i: I... F;.: Y 'i 4 .... i 2 :3 ..... i (') .... 9 i F:' F;,' O D LJ C 'f' I O i"4 F:' R' C.I F' I L.. E · :'~ "~t 4 .... '2 3 /,"- :3 ..... :? i F:' F;: 0 D tJ C'i" I O N F:'R O F:' I I... E i..;-'::' "" 4 ,..."'~ ..... I ':? .... 9 i F:' F;.: I ,S' M A N A L.. Y',S' l ~,' 'i 6 .... i 5 3 "- ~']"' 9 t I.. E A I< D E:' '1" E C'f' I 0 N i/- -- ":' 4 3 .... '::;' .... (:;' 'i L.. IE A K I) r..!;'F E-'. C 1' I 0 N ,..ti ~... · ,.:, .... t 6 5 .... !ii .... 91 F' R 0 DtJ C I I 0 N I":" R 0 r.r I L F": !.. I.. [':. ¢..,,.',: E...~ I [:.;. N A N I) F;.: ['!; 'f' LJ f;,: N T I-'t E A T 1 a., i--I E. I) C C) Y 1:;: Ii:.: C Iii; :1: V Iii: D B Y .../.~ ......... I'.1A V E: A i"~ :1: C Iii: I) r.".'l Y ! A F:' F' I;: O V E I) 'FI:;:AN,~;.':~ 9t ()82 I> I ~' T R I B U 1' I C] N :..- CIE N TI;,'AI... I:" I L E,~' · "' C.. I"11~:. ¥ F,, 0 N 'Ir D & t't E X 'f' F.i: N,'? I 0 N E X f:' L. C) R A T I 0 N Iii: X X CI t'4 .... M A R A T H O N :,': I't [) }'.'~ I I_ · :~ T I"1 Iii; C 0 F;.: F;,' E C'T' E I) A F:' ]; :,",: I::'O R t 3"' 5 I ,? 5: O- O 2 9-'2 0 6 2 6, .. . l .... ,...5 ;[~," :'~' ':'*. 'f' I"1 Iii C [:)F;: F;; E fi 'f' Iii; D r.":'l F:' I :~: F: [] F( t z ."~" ARCO Alaska, Inc Prudhoe Bfi~L'~ineering Post Office Box 100360 Anchorage, Alaska 99510-0360 Telephone 907 263 4248 Donald F. Scheve Operations Engineering Manager October 20, 1989 C. V. "Chat" Chatterton Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Re: DS 4-19 Permit No. 88-24 Dear Mr. Chatterton: Enclosed, in duplicate, are the Report of Sundry Well Operations and Daily Report of Well Operations detailing the work completed on the above- mentioned wells. Very truly yours, D. F. Scheve DFS/WDM/ry Enclosures cc' J. S. Dietz, BP Exploration J. Gruber- ATO-1478 PI(DS4-19)Wl-3 ARCO Alaska, Inc. is a Subsidiary of AtlanticRichfieldCompany AR3B--6132-C STATE OF ALASKA ALASKA ~ AND GAS CONSERVATION CCI ilSSION REPORT OF SUNDRY WELL OPF_.HATIONS 1. Operations performed: Operation shutdown Stimulate Plugging Perforate X Pull tubing Alter casing Repair well Other 2. Name of Operator ARCO Alaska, Inc. 3. Address P.O. Box 100360, Anchorage, AK 99510-0360 4. Location of well at surface 916' FSL, 258' FWL, Sec. 26, T11N, R15E, UM At top of productive interval 916' FSL, 258' FWL, Sec. 26, T11 N, R15E, UM At effective depth 916' FSL, 258' FWL, Sec. 26, T11 N, R15E, UM At total depth 916' FSL, 258' FWL, Sec. 26, T11N, R15E, UM 5. Type of Well Development Exploratory Stratigraphic Service 6. Datum of elevation(DF or KB) 60' RKB feet 7. Unit or Property Prudhoe Bay Unit 8. Well number DS 4-19 9. Permit number/approval number 88-24/9-781 10. APl number 50 - 029-21791 11. Field/Pool Tertiary/Cretaceous Undefined 12. Present well condition summary Total depth: measured 7000 feet true vertical 7000 feet Effective depth: measured 6900 feet true vertical 6900 feet Casing Length Size Conductor 80' 20' Surface 2952' 13-3/8" Production 6958' 9-5/8" Plugs(measured) Junk(measured) Cemented 2150# Poleset 2500 sx CSIII & 600 sx CSII 1350 sx Class G & 300 sx CSI Measured depth True verticaldepth 115' 115' 2984' 2984' 6993' 6993' Perforation depth: measured See Attachment A true vertical See Attachment A Tubing (size, grade, and measured depth) 7", 5-1/2", L-80, tbg w/tail @ 3110' 0CT 2 4 & Gas cons, Comrn ssion Anchorage Packers and SSSV (type and measured depth) FB-1 pkr @ 3000' (WLM) & WRDP-2-SS-BAL-S SSSV @ 2211' 13. Stimulation or cement squeeze summary Intervals treated(measured) N/A Treatment description including volumes used and final pressure 14. Prior to well operation Subsequent to operation Representative Daily Average Production or Injection Data Oil-Bbl Gas-Md Water-Bbl Casing Pressure 0 0 40,000 1400 0 0 50,000 1600 Tubing Pressure 1550 1800 15. Attachments Copies of Logs and Surveys run Daily Report of Well Operations 16. Status of well classification as: Oil Gas Suspended Service Water Disposal 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed ~¢//~~~~__,. Title Operations Engineering Manager Form 10-404 Rev 06/15/88 Date SUBMIT IN DUPLICATE Attachment A REPORT OF SUNDRY WELL OPERATIONS DS 4-19 Perforation Depth: Measured: True Vertical: 5930-5950', 6100-6138', 6434-6484', 6798-6842', 5930-5950', 6100-6138', 6434-6484', 6798-6842', 5962-5984', 6155-6172', 6494-6514', 6868-6882' 5962-5984', 6155-6172', 6494-6514', 6868-6882' 5990-6020', 6246-6388', 6562-6602', 5990-6020', 6246-6388', 6562-6602', 6072-6080', 6394-6404', 6712-6732', 6072-6080', 6394-6404', 6712-6732', '.:.,ilv Report of Well O_nera~ns DS 4-19 Perforating Operations' Began perforating operations on 3 September 1989. Rig up perforating unit, pressure test BOP's and lubricator to 3000 psi, okay. Shut-in well. RIH with gun gl, tied-in with GR-CCL and flagged line, opened well for drawdown, shot 6155'-6172' with 9 shots (1/2 SPF). Shut-in well, POOH, all shots fired. RIH with gun g2, tied-in with CCL, opened well for drawdown, shot 6118'-6138' with 12 shots (1/2 SPF). Shut-in well, POOH, all shots fired. RIH with gun g3, tied-in with CCL, opened well for drawdown, shot 6100'-6118' with 11 shots (1/2 SPF). Shut-in well, POOH, all shots fired. RIH with gun g4A and g4B, tied-in with CCL, opened well for drawdown, shot 6072'-6080' with gun g4A with 5 shots (1/2 SPF), and shot 6010'-6020' with gun g4B with 6 shots (1/2 SPF). Shut-in well, POOH, all shots fired. RIH with gun g5, tied-in with CCL, opened well for drawdown, shot 5990'-6010' with 12 shots (1/2 SPF). RIH with gun g6, tied-in with CCL, opened well for drawdown, shot 5962'-5984' with 13 shots (1/2 SPF). Shut-in well, POOH, all shots fired. RIH with gun g7, tied- in with CCL, opened well for drawdown, shot 5930'-5950' with 12 shots (1/2 SPF). Shut-in well, POOH, all shots fired. Rig down and secure well. Ref. B HCS 4/6/88 WDM ~-,I-'....0 AI_AZKA, Iix/(]. F'.O. BOX 'i ANCH]RAbE ALAJ~'K A 995J~ DATE' 9-'18-89 REFERENCE ' ARCO PRESSURE DATA 4-5 8-S0-89 BHF'--.?TA'r I C ti' RAD I EN'I' 4-t9 8-29--89 BHF'--S"f'ATIC GRADIENT 7'-28 8--'29--89 B Fl F'-- ~"l"A'l" I C GRAD IEN'f' 9-2 7-5-89 BHF'--$1'Ai' I C GRADIENT 9-32 o-"~-89, ,. BHP--£TATIC GRADIENT 9-S6 9-'-,-8o,~. , BHF'--~,"I"ATIC~, . GRADIENT i2'-28 8-'JS--89 BHF ..... FLOWING GRADIEN'i' J2'-¥J 6-5-89 BHP--S~TATIC GRADIENT i ~') '.t' -' _ ,.-,.,,:S 6 5 89 BHP--$]"ATIC GRADIENT t ;'~-t 4 8-J r.J-89 . BHP--~'TATIC GRADIENT J4-37 9-2-89 BHP--~?TATIC GRADIENT J6-6 8-iJ-89 ' BHP--~"f'ATIC GRADIENT i6-t8 8-2t --8-9 BHF ....FLOWING GRADIENT J 6-'2~-3 8-t 3-89 BHP--.X'TATIC GRADIENT -"'~ -89 --$' t8 ..~(: 8-Jt BHF' TATIC GRADIENT F'LEAS'E SIGN AND RETURN THE ATTACHED COPY AS RECEIPT OF CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO HR~ CAMCO CAMCO DATA~ RECEIVED BY HAVE A NICE DAY! E SALLY HOFFECKER AF'F'ROVEI) ~_._ A T O- t 529 Oil & Gas UOD~ ~' Ancho ge DISTRIBUT]:ON CENTRAL FILES ~~ .PHILLIPS CHEVRON F'B WELL FILES D&M '~ ~ R&D EXTENSION EXF'LORATION '"' ~ BF'X EXXON ~ ~ STATE OF ALASKA MARATHON ~' TEXACO MOBIL ARCO ALASKA, INC. F'.O. BOX J00360 ANCHORAGE, ALASKA DATE' 9-J 8-89 REFERENCE' ARCO CASED HOLE FINALS J-? 8-23-89 F'RODUCTION PRC)FILE RUN 2-4 9-2-89 LEAK DE'I'EC'FION SURVEY RUN 2-J 9 8-24-89 PITS RUN 3-t6 8-25-89 INJECTION PROFILE RUN 4-'5 8-30-89 STATIC TEMF' SURVEY RUN 4-J9 8-29-89 STATIC I'EMF' SURVEY RUN 4-J9 8-30-89 TEMP FM RUN 6-14 9-J 0-89 COLLAR RUN 7-J~ 8-3J-89 LEAK DETECTION SURVEY RUN J2-2J 8-30-89 TEMF' SURVEY RUN 13-22 8-3J-89 INJECTION F'ROFILE RUN J4'-2~ 8-30-89 PRODUCTION PROFII_E RUN J4-24 8"-3J-89 F'RODUCTION PROFILE RUN t4-34 8-~0-89 PRODUCTION PROFILE RUN J6-4 8-J3-89 LEAK DETECTION RUN J7'-7 5-J9-89 LEAK DE-FECTION RUNS iT-ii 5-i9-89 LEAK DETECTION RUNS PLEASE SI(iN AND RETJRN THE ATTACHED COPY AS RECEIPT OF DATA~ C A M C 0 CAMCO CAMCO CAMCO CAMCO (]AMC(] CAMCO A'FLAS CAMCO HR$ CAMCO CAMCO CAMCO CAMCO CAMCO OTIS OTIS RECEIVED BY HAVE A NICE DAY! SALLY IqOF:'F'ECKER AT0-i529 CENTRAL FILES CHEVRON D & M EXTENSION EXPLORATION EXXON HARATHON HOBIL APPROVED ~__ TRAN$~ 89Z~94 PHILLIPS F'B WELL FILES R & D BF'X S'I'AI'E OF ALASKA TEXACO ARCO ALASKA, INC. F'~O. BOX 100360 ANCHORAGE, ALASKA DATE' 9-8-89 REFERENCE' ARCO CASED HOLE FINALS t-3 8-30-89 PERF RECORD RUN t-9 8-3t-89 COMF'LETION RECORD RUN 2- t t 9-3-89 COLLAR/PERF RUN 4- ~ 9 9-3-89 COLLAR/PERF RUN ?-8 ~-~.-89 F°DK-t O-O RUN t I-~ 9-t-89 COLLAR/F'ERF RUN ~ t-3 9-t-89 COLLAR/PERF RUN t t - t 8 9-2-89 COLLAR/F'ERF RUN t 4-3.0 9--~ -89 COI. LAR/PERF RUN ~ 8-24 8-3~-89 COLLAR/F'ERF RUN PLEASE SIGN AND RETURN THE ATTACHED COPY AS RECEIPT OF' DATA. g'CH g'CH ATL. Ag' Al'LAS ATLAS A TI_ A.",,~ ATLAS ATI_A,? A'FLAS ATLA~ RECEIVED BY __ HAVE A NICE DAY! SALLY HOFFECKER A'FO-t529 APPROVED ..~ 'FRANS.~ 89~- DISTRIBUTION CENTRAL FILE~ CHEVRON D & M EXTENSION EXPLORATION EXXON MARATHON MOBIL PH'[LLIPS F'B WELL FILES BPX STATE OF ALASKA TEXACO ARCO Alaska, Ir~ Prudhoe b,,,~-c~ngineering Post Office Box 100360 Anchorage, Alaska 99510-0360 Telephone 907 263 4248 Donald F. Scheve Operations Engineering Manager August 30, 1989 C. V. "Chat" Chatterton Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Re' DS 4-19 Permit No. 88-24 Dear Mr. Chatterton: Attached, in triplicate, is the Application for Sundry Approval detailing work to be performed on the above-referenced well. Very truly yours, D. F. Scheve DFS/WDM/ljm Attachment cc' J.S. Dietz, BP Exploration J. Gruber- ATO 1478 PI(DS4-19)Wl-3 ,a - ARCO Alaska, Inc. is a Subsidiary of AtlanticRichfieldCompany AR3B--6132-C STATE OF ALASKA ALASI/-'"'~IL AND GAS CONSERVATION ( vlMISSION APPLICATION FOR SUNDRY AP'PROVALS 1 Type of Request: Abandon Suspend Operation shutdown Re-enter suspended well Alter casing Repair well Plugging Time extension Stimulate Change approved program Pull tubing Variance Perforate X Other 2. Name of Operator ARCO Alaska, Inc. 3. Address P.O. Box 100360, Anchorage, AK 99510-0360 5. Type of Well Development Exploratory , Stratigraphic Service 4. Location of well at surface 916' FSL, 258' FWL, Sec. 26, T11N, R15E, UM At top of productive interval 916' FSL, 258' FWL, Sec. 26, T11N, R15E, UM At effective depth 916' FSL, 258' FWL, Sec. 26, T11N, R15E, UM At total depth 916' FSL, 258' FWL, Sec. 26, T11N, R15E, UM 12. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical Casing Length Conductor 80' Surface 2952' Production 6958' 7000 feet Plugs(measured) 7000 feet 6900 feet 6900 feet Junk(measured) Size Cemented 20" 2150# Poleset 13-3/8" 2500 sx CS 111 & 600 sx CS11 9-5/8" 1350 sx Class G 6. Datum of elevation(DF or KB) 60 ' RKB feet 7. Unit or Property Prudhoe Bay Unit 8. Well number DS 4-19 9. Permit number 88-24 10. APl number 50 - 029-21791 11. Field/Pool Tertiary/Cretaceous - Undefined ~. . A 11989 &GasC0ns Co'n' ....... Measured depth '*t~~ical--~- depth 115' 115' 2984' 2984' 6993' 6993' Perforation depth: measured 6246-6388', 6394-6404', 6434-6484',6494-6514', 6562-6602',6712-6732',6798-6842',6868-6882' true vertical 6246-6388',6394-6404',6434-6484',6494-6514',6562-6602,,6712_6732,,6798_6842,, 6868-6882 Tubing (size, grade, and measured depth) 7", 5-1/2", L-80 tbg w/tail @ 3110' Packers and SSSV (type and measured depth) FB-1 pkr @ 3000' (WLM) & WRDP-2-SSA-BAL-S SSSV @ 2211' 13, Attachments Description summary of proposal 14. Estimated date for commencing operation September 6, 1989 16. If proposal was verbally approved x Detailed operations program Name of approver Date approved Service 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. 15. Status of well classification as' Oil Gas Suspended Water Disposal BOP sketch x Signed Title Operations Engineering Manager Conditions of approval: Notify Commission so representative may witness Plug integrity . BOP Test .. Location clearance Mechanical Integrity Test Subsequent form required 10- ORIGINAL SIGNED BY J n~.,m: ~ S,~TI,I Approved by order of the Commissioner Form 10-403 Rev 06/15/88 Date ~ ~'/~?' I Approval No. ¢_ 7¢ / ~proved ~_ __~ SUBMIT IN TRIPLICATE ARCO Alaska, Inc. proposes to perforate DS 4-19 at selected intervals within the Tertiary/Cretaceous. All wireline work will be done through a 5000 psi WP BOP/Lubricator, tested to 1.2 times the maximum expected surface pressure. The SSSV will be installed at the conclusion of the perforating and clean-up operation. The well is currently on produced water injection. Produced water will be in the wellbore during perforating operations. The reservoir pressure at the perforation depths is approximately 3070 psi. Proposed Perforation Intervals: 5930' - 5950' 5962' - 5984' 5990' - 6020' 6072' - 6080' 6100' - 6138' 6155' - 6172' Ref: BHCS 4/6/88. 1. S000 PSI ?" WELLHEAD CONNEC10R rLANG£ :2. 5000 PSI WIRELINE RAMS (VARIABLI: SIZE) 3. $000 PSI 4 1/&" LUBRICATOR 4. 5000 PSi 4 ~/~" fLOW lUBE PAcK-orr 2 H!RELINE BOP EGuIp~,NT ARCO ALA~'KA, INC I"", 0 · BOX i (3(:),36(3 ANCHORAGE, ALA,gKA 995i o DATE- 8-2-89 REFERENCE- ARCO CASED HOLE FINAI_Z i -4 5-26--89 ~ - ~ 7 7-..3-89 2-4 6-24-89 ~- i 6 7-S"-89 S-9 .5-t 0-89 4-5 6- i i -89 4-i 9 5-Si -89 7-{6 5-{ '-89 ~ ~ -~ S 5-24-89 ~ ~ '-~ 6 5-24-89 { {.-28 7-24-89 { {-28 7-24-89 { {-28 7-24-89 { 2-2S 6-4-89 {2-2~ 6-{ 5--89 j 2-30 6-J-89 ~-S{.- 6-2~89 { 2-SS 6-3-89 {4-2 7-3-89 { 4-27 6-29-89 { 7-9 6-{ 6-89 PERF RECORD F'ERF RECORD PERF RECORD PERF' RECORD COLLAR/PERF PERF RECORD PERF RECORD COLLAR/PERF F'ERF RECORD PERF RECORD CBT CE'/ GR F'ERF RECORD F'ERF RECORD PERF RECORD PERF RECORD F'ERF RECORD F'ERF RECORD F'ERF RECORD PERF RECORD RUN i , 5" I.iL,S RUN t, 5" HL$ RUN i , 5' i-tL~ RUN RUN t, 5" I-iLS.' RUN i, ~" HI_.~£ RUN i, 5" HL.? RUN i , 5" HL_3' RUN i , 5" I'-IL~' RUN i , ~" HLZ RUN i ,.5: 5,'CH RUN i, ~" $CH RUN i, u. ~" S'CH RUN i , 5" HL~; RUN i , ~'-" HL.g RUNS i-6, 5" HL$ . .. RUN3'... t-6, 5" HL3~ RUN,, t-S 5 ~'' HL~ RUN t, 5~ HL3' RUN~ t&2, 5" HL~ 'RUN i , 5" HC3'"-'~ PLEASE SIGN AND RETURN- THE ATTACHED COPY .AS RECEIPT OF DATA. RECEIVED BY HAVE A NICE DAY! SALLY HOFFECKER AT0-~529 .g~::~,..' .~.'.¥':~. ~ .. :.." ..:.-: "~: - DIS.TRIBU'FION' CENTRALs C H E V R 0 N ': D & M EXTENSION EXPLORATION EXXON MARATHON .'- MOBIL '"' PHILLIPS' PB WELL F'ILE3' R & D BPX STATE OF ALA~'KA TEXACO ARC() ALASKA, IN.C F",.O, BOX i ANCHORAGF', ALAY'~<A 995i ¢' DATE' 7-i 0-89 REFERENCE' ARCO CASED HOLE FINALS' i -25 6/2:5-24 3-i 6-i 4--89 3-26 6-2t -89 :5-S4 6- i S-89 ~-S4 6-i 9.-89 4'-~ 9 6-i 5-89 4-Si 6-i 4-89 9-i 6 6-t 8-89 i i -i 6-i 6-89 i i -'-'4~ 6-i 7-89 i 3-6 6-o3-8o,;. , i 4-27 .6-2:;-89.., i 4-37 6-26-89 i 4-38 6-2S-89 i 6-9 6-22-89 ,,"89 LEAK I)ETECTION F'RODUCTZON F'ROF-' I t_E F'i'i'.ODUCT I ON PROFI'LE F'F','ODUCT I ON F'ROF iL.E F'I TS' INJIECTION PROFILE TEHF' INJECi' ]:ON PROFILE F'RODUCT]:ON PROFILE F'RODUCTZON PROFILE ]_' NJECT I IZIN PROFILE F'F<ODUCI'):. ON F'ROF~LE PRODUCTION F'ROFILE F'RODUCT'[ON PROFILE F'RI]DUCTT CIN PROFILE RuN R I.j N R U N RUN RUN RUN R U N RUN RUN RUN "t t R ..~N RUN RUN RUN RUN i, i, i, i, i, i, i, i, t, i, i, i, 1, i, PLEASE SISN AND RETURN THE ATTACHED COPY AS R!FCEIPT RECEIVED BY HAVE A NICE DAY! SALLY t-IOFF'ECKER A'FO- t 529 OF DATA C A M L; 0 C A i'~ C' 0 C A M L; 0 C ~'~ Pi C 0 C A d C 0 Cra ~,~ C 0 C A M C 0 C A H C C) C Atq C 0 C A M C ('J CAMCO CAMCO CAMCO CAMCO CAHCO DISTRIBUTION ~ CENTRAL FILEs'. ~'"' F'HILL:[PS' ~ CHEVRON I~'B WELl_ FILES D &.M .' R & D '~ EXTENSION, EXPLORATION ii: BF'X ~-"- EXXON ~ ~" ~' A'I'E, OF ~'ALASK A MARATHON ~ i"EX~qCO - MOBIL ARCO Alaska, In( Prudhoe B~'~'~agineering Post Office Box 100360 Anchorage, Alaska 99510-0360 Telephone 907 263 4248 Donald F. Scheve Operations Engineering Manager July 3, 1989 C. V. "Chat" Chatterton Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Re' DS 4-19 Permit No. 9-420 Permit No. 88-24 Dear Mr. Chatterton: Enclosed is the Report of Sundry Well Operations detailing the work completed on the above-mentioned wells. Very truly yours, D. F. Scheve DFS/WDM/nmh/sec Attachment cc: B P Exploration J. Gruber- ATO 1478 PI(DS4-19)W1-3 ARCO Alaska, Inc. is a Subsidiary of AtlanticRichfieldCompany AR3B--6132-C STATE OF ALASKA ALASK/'-"~L AND GAS CONSERVATION C('--'MISSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown Stimulate Plugging Perforate X Pull tubing Alter casing .. Repair well Other 2. Name of Operator ARCO Alaska, Inc. 3. Address P.O. Box 100360, Anchorage, AK 99510-0360 4. Location of well at surface 916' FSL, 258' FWL, Sec. 26, T11N, R15E, UM At top of productive interval 916' FSL, 258' FWL, Sec. 26, T11N, R15E, UM At effective depth 916' FSL, 258' FWL, Sec. 26, T11N, R15E, UM At total depth 916' FSL, 258' FWL, Sec. 26, T11N, R15E, UM 5. Type of Well Development Exploratory Stratigraphic Service 6. Datum of elevation(DF or KB) 60' RKB feet 7. Unit or Property Prudhoe Bay Unit 8. Well number DS 4-19 9. Permit number/approval number 88-24/9-420 10o APl number 50 - 029-21791 11. Field/Pool Tertiary/Cretaceous Undefined 12. Present well condition summary Total depth: measured true vertical 7000 feet Plugs(measured) 7000 feet Effective depth: measured 6900 feet true vertical 6900 feet Junk(measured) Casing Length Size Cemented Measured depth True vertical depth Conductor 80' 20' 2150# Poleset 115' 115' Surface 2952' 13-3/8" 2500 sx CSIII & 600 sx CS II 2984' 2984' Production 6958' 9-5/8" 1350 sx Class G & 300 sx CS I 6993' 6993' Perforation depth: measured 6246-6388', 6394-6404', 6434-6404', 6434-6484', 6494-6514', 6562-6602', 6712'-6732' 6798-6842', 6868-6882' true vertical 6246-6388', 6394-6404', 6434-6484', 6494-6514', 6562-6602', 6712-6732', 6798-6842', 6868-6882' Tubing (size, grade, and measured depth) 7", 5-1/2", L-80, tbg w/tail @ 3110' Packers and SSSV (type and measured depth) FB-1 pkr @ 3000' (WLM) & WRDP-2-SS-BAL-S SSSV @ 2211' 13. Stimulation or cement squeeze summary .~.,. 14. Intervals treated(measured) N/A Treatment description including volumes used and final pressure Representative Daily Average Produ~ion or Injection Data Prior to well operation Subsequent to operation OiI-Bbl Gas-Md Water-Bbl Casing Pressure Tubing Pressure 0 0 40,000 1920 1700 0 0 45,000 1500 1650 15. Attachments Copies of Logs and Surveys run Daily Report of Well Operations 16. Status of well classification as: Oil Gas Suspended . Service X 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed 2~"~ J,~--'~--~ Title Operations Engineering Manager Date Form 10-404 Rev 06/15/88 SUBMIT IN DUPLICATE Summary of Perforating Operations DS 4-19 Began perforating operations on 31 May 1989. Backflowed well with artificial lift gas to achieve drawdown. Rig up perforating unit, pressure test BOP's and lubricator to 3500 psi, okay. Shut-in well. RIH with gun #1, tied-in with GR, opened well for drawdown, shot 6346'-6366' with 10 shots (1/2 SPF). Shut- in well, POOH, all shots fired. RIH with gun #2, tied-in with GR, opened well for drawdown, shot 6326'-6346' with 1J_0__shots (1/2 SPF). Shut-in well, POOH, all shots fired. RIH with gun #3, tied-in with GR, opened well for drawdown, shot 6306'-6326' with 10 shots (1/2 SPF). Shut-in well. RIH with gun #4, tied-in with GR, opened well for drawdown, shot 6286'-6306' with 10 shots (1/2 SPF). Shut-in well, POOH, all shots fired. RIH with gun #5 tied'in with GR, opened well for drawdown, shot 6266'-6286' with 10 shots (1/2 SPF). Shut-in well, POOH, all shots fired. RIH with gun #6, tied-in with GR, opened well for drawdown, shot 6246'-6266' with 10 shots (1/2 SPF). Shut-in well, POOH, all shots fired. Rig down and secure well. Ref. B HCS 4/6/88 WDM ARCO'Alaska, In( Prudhoe B ~'~7~-...rig i nee ri n g Post Office Box 100360 Anchorage, Alaska 99510-0360 Telephone 907 263 4248 Donald F. Scheve Operations Engineering Manager Mav 26, 1989 C. V. "Chat" Chatterton Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Re' DS 4-19 Permit No. 88-24 Dear Mr. Chatterton' Attached is the Application for Sundry performed on the above-referenced well. Approval detailing work to bc Very truly yours, D. F. Scheve DFS/WDM/ljm Attachment cc' BP Exploration J. Graber- ATO 1478 PI(DS4-19)W13 RECEIVEP MAY 2 6 7t 89 Oil & Gas Cons~ Commissior~ A~cho~age ARCO Alaska, Inc. is a Subsidiary of AtlanticRichfieldCompany AR3B--6132-C STATE OF ALASKA ALASK/~-"L AND GAS CONSERVATION Cf, dlSSION APPLICA, ION FOR SUNDRY APPROVALS 1. Type of Request: Abandon Suspend Operation shutdown Re-enter suspended well Alter casing Repair well Plugging Time extension Stimulate Change approved program Pull tubing Variance Perforate X Other 2. Name of Operator ARCO Alaska, Inc. 3. Address P.O. Box 100360, Anchorage, AK 99510-0360 5. Type of Well Development Exploratory Stratigraphic Service 6. Datum of elevation(DF or KB) 607 RKB feet 7. Unit or Property Prudhoe Bay Unit 4. Location of well at surface 916' FSL, 258' FWL, Sec. 26, T11N, R15E, UM At top of productive interval 916' FSL, 258' FWL, Sec. 26, T11N, R15E, UM At effective depth 916' FSL, 258' FWL, Sec. 26, T11N, R15E, UM At total depth 916' FSL, 258' FWL, Sec. 26, T11N, R15E, UM 8. Well number DS 4-19 9. Permit number 88-24 10. APl number 50 - 029-21791 11. Field/Pool CRETACEOUS- UNDEFINED 12. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical Casing Length Conductor 80' Surface 2952' Production 6958' 7000 feet Plugs(measured) 7000 feet RECEiVE[) 6900 feet 6900 feet Junk(measured) Ala¢~a Oil & Gas Cons, O0rnmissi0rt Size Cemented Measured del~tl~h01~i~i~ vertical depth 20" 2150# Poleset 115' 115' 13-3/8" 2500 sx CS 111 & 600 sx CS11 2984' 2984' 9-5/8" 1350 sx Class G 6993' 6993' Perforation depth: measured 6366-6388', 6394-6404', 6434-6484',6494-6514', 6562-6602',6712-6732',6798-6842',6868-6882' true vertical 6366-6388',6394-6404',6434-6484',6494-6514',6562-6602',6712-6732',6798-6842', 6868-6882 Tubing (size, grade, and measured depth) 7", 5-1/2", L-80 tbg w/tail @ 3110' Packers and SSSV (type and measured depth) FB-1 pkr @ 3000' (WLM) & WRDP-2-SSA-BAL-S SSSV @ 2211' 13. Attachments Description summary of proposal x Detailed operations program BOP sketch x 14. Estimated date for commencing operation June 1, 1989 16. If proposal was verbally approved Oil Name of approver Date approved Service 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed ~¢'~¢',¢~,K~g~'~_/ Title 15. Status of well classification as: Gas Suspended Water Disposal Operations Engineering Manager Date FOR COMMIq~;ION USE ONLY Conditions of approval: Notify Commission so representative may witness Plug integrity BOP Test_ Location clearance Mechanical Integrity Test SubSequent form required 10- Approved by order of the Commissioner ORIGINAL SIGNED BY LONNIE C. SMITH Approved Copy Return, oe~ --Commissioner Approval No. ?.__ Date Form 10-403 Rev 06/15/88 SUBMIT IN TRIPLICATE ARCO Alaska, Inc. proposes to perforate DS 4-19 at selected intervals within the Tertiary/Cretaceous. All wireline work will be done through a 5000 psi WP BOP/Lubricator, tested to 1.2 times the maximum expected surface pressure. The SSSV will be installed at the conclusion of the perforating and clean-up operation. The well is currently on produced water injection. Produced water will be in the wellbore during perforating operations. The reservoir pressure at the perforation depths is approximately 3010 psi. Proposed Perforation Interval: 6246' - 6366' Ref: BHCS 4/6/88. 2 ~. $000 PS~ 7" w£LLHC, K) CONN£C~OR IrL~G£ :2. $000 PS~ WtR£~IN£ R~dS (V~RL~B~£ S~Z£) 3. ~)000 PSI 4 1/6" LUBRICATOR 4. S000 PS~ 4 q/6" fLOW ~UB£ P,CK-Orr HIRELINE BOP EOUIPHENT ARCO Alaska, In~ Prudhoe B~gineering Post Office Box 100360 Anchorage, Alaska 99510-0360 Telephone 907 263 4248 Donald F. Scheve Operations Engineering Manager April 21, 1989 C. V. "Chat" Chatterton Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Re: DS 4-19 DS 4-19 Approval No: 9-235 Permit No: 88-24 Dear Mr. Chatterton: Enclosed is the Report of Sundry Well Operations detailing work completed on the above- mentioned well. Very truly yours, D. F. Scheve DFS/WDM:sd Enclosures CC: BP Exploration J. Graber -ATO 1478 PI(DS 4-19)W1-3 Alaska Oil & Gas Cons. ' gnchom§e ARCO Alaska, Inc. is a Subsidiary of AtlanticRichfieldCompany AR3B--6132-C STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown__ Stimulate__ Pull tubing __ Alter Casing __ Plugging Repair well __ Perforate Other 2. Name of Operator ARCO Alaska, INC. 3. Address P.O. Box 100360, Anchorage, AK . 99510 5. Type of Well: Development Exploratory Stratigraphic Service Location of well at surface 916'FSL, 258'FWL, Sec. 26, T11N, R15E, UM At top of productive interval 916'FSL, 258'FWL, Sec. 26, T11N, R15E, UM At effective depth 916'FSL, 258'FWL, Sec. 26, T11N, R15E, UM At total deoth 916'FSL, 258'FWL, Sec. 26, T11N, R15E, UM 6. Datum elevation (DF or KB) 60' RKB 7. Unit or Property name Prudhoe Bay Unit 8. Well n,,r~l~,-,r DS 4-19 9. Approval Numbers 0-33G '=[-,2,$4 10. APl number 50-029-21791 11. Field/Pool Cretaceous - Undefined feet 12. Present well condition summary: Total depth: measured true vertical Effective depth' measured true vertical 7000 7000 6900 6900 feet Plugs (measured) feet feet Junk (measured) feet Casing Length Size Conductor 80' 20' S u rface 2952' 1 3 - 3 / 8" Production 6958' 9-5/8" Cemented 2150// Poleset 2500 sx CSIII & 600 sx CS II Perforation depth: measured 6366-6388', 6712-6732', true vertical 6366-6388', 6712-6732', Tubing (size, grade, and measured uupuu 7"/5-1/2", L-80, tbg w/tail @ 3110' Packers and SSSV (type and measured depth) FB-1 pkr @ 3000' (WLM) & WRDP-2-SS-BAL-S SSSV @ 2211' Measured depth 115' 2984' 1350 sx Class G & 6993' 300 sx CS I 6394-6404',6434-6484', 6494-6514', 6798-6842', 6868-6882' 6394-6404', 6434-6484', 6494-6514', 6798-6842', 6868-6882' True vertical depth 115' 2984' 6993° 6562-66O2', 6562-66O2', RECEIVED 13. Stimulation or cement squeeze summary Intervals treated (measured) N/A Treatment description including volumes used and final pressure ..-,,,,o,,~ 0JJ & Gas Cons. C~missi0t~ 14. Prior to well operation Subsequent to operation Representative Daily Average Production or Injection Data OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure 0 0 40,000 1920 0 0 45,000 1500 Tubing Pressure 175O 1800 15. Attachments Copies of Logs and surveys run __ Daily Report of Well Operations 16. Status of well classification as: Oil Gas __ Suspended __ Service 17. I hereb~,.~certify that the foregoing is true and correct to the best of my knowledge. Signed ,~~.~~~.~__~ Title Oper. Engr. Manager Date Form 10-404 Rev 06/15/88 SUBMIT IN DUPLICATE Summary of Operations DS 4-19 Began perforating operations on 31 March 1989. Backflowed well with artificial lift gas to achieve drawdown. Rig up perforating unit, pressure test BOP's and lubricator to 3500 psi, okay. Shut-in well. RIH with gun #1, tied-in with GR, opened well for drawdown, shot 6366'-6388' with 88 shots (4 SPF). Shut-in well, POOH, all shots fired. RIH with gun #2, tied-in with GR, opened well for drawdown, shot 6394'-6404' with 40 shots (4 SPF). Shut-in well, POOH, all shots fired. RIH with gun #3, tied-in with GR, opened well for drawdown, shot 6434'-6454' with 80 shots (4 SPF). Shut-in well, POOH, all shots fired. Rig down and secure well. Ref. BHCS 4/6/88 ~~'~'~ ~ ARCO ALASKA, INC. F'.O. BOX t0036~'~ ANCHORAGE, ALA~'KA 995t0 DATE · 4-t 4-89 REFERENCE' ARCO CA~ED HOLE FINALS 3-'12 4-9-89 F'FC RUN t , 5' 4-t9 3-3t-89 PFC RUN t, 5' 6-t0 4-.2-89 COLLAR/F'ERF RUN t, 5' 6-t 2 3-8-89 COLLAR/F'ERf--' RUN t , 5" T-~)? ..-,?-8° F'RODUCTION PROFILE R. UN i, 5' 7-29 2-2?-89 PRODUCTION PROFILE RUN i, 5' i5-22 3-'i-89 COLLAR/F'ERF RUN i, 5' PLEASE SIGN AND RETURN THE ATTACHED COPY AS RECEIF'T OF DATA. A'i" LA,2' A ]' I_ A .'.'~7 A 't" L A ,~,.." HL~ C A H C O C A i".i C: O HL,2' RECEIVED BY HAVE A NICE DAY! SALLY HOFF'ECKER AT0-t529 Anchorage DISTRIBUTION · "' CENTRAL FILES · "' CHEVRON D & M "" EXTEN,.5'I ON EXPLORATION · "' EXXON MARATHON ~ MOBIL PHILLIPS F'B WELL FILES' R & D BF'X STATE OF ALASKA TEXACO ARCO ALASKA, INC. F'.O. BOX tr~{)360 ANCHORAGE, ALASKA DATE: 3-29-89 REFERENCE: ARCO PRE£$URE DATA 4-2 2-i{)-89 BHF'--FLOWING GRADIENT CAMCO 4-i9 i-3i-89 BHF'--STATIC GRADIENT CAMCO 5-i? 2-i6-89 BHF'--STATIC GRADIENT CAMCO 6-8 2-5-89 BHF'--S'FATI C GRADIENT CAMCO 9-3 i -i 5-89 BHP--STATIC GRADIENT O'FI.~' 9-ti t-31-89 BHP--STATIC GRADIENT CAMCO 9-ii 3-5-89 BHF'--FLOWING GRADIENT CAMCO tt-i t2-2i-88 BHP--STATIC GRADIENT OTIS ii-ii 3-i7-89 BHP--SI'ATIC GRADIENT OTIS ii-J6 3-i4-89 BHP--STA'FIC GRADIENT OTIS i2-i5 2-ii-89 BHP--STATIC GRADIENT CAMCO ~ ~3 ~ ~5-89 BHF'--$TATIC GRADIENT CAMCO ~4-28 2-5-89 BHP--£TATIC GRADIENT CAMCO t6-& 3-~-89 BHP--F'RE$$URE BUILD-UF' OTIS ~8-t7 2-~3-87 BHF'--FLOWING GRADIENT CAMCO F'WDWt-~ 3-J-89 BHP--$TATIC GRADIENT CAMCO PLEASE SIGN AND RETURN THE ATTACHED COF'Y AS' RECEIPT OF DATA. RECEIVED BY_ HAVE A NICE SALLY HOFFECKER ATO-~ 52~ TRANE ~89~ AF'PROVED .... DAY! ~ ~ Alas'da Oil & Gas Cons. Commissior; Anchorage DISTRIBUTION CENTRAL FILEE ~ ~ PHILLIPS CHEVRON F'B WELL F'ILES' D & M '~ ~ R & D EXTEN£ION EXPLORATION ~' SAF'C EXXON ~ ~ STATE OF ALASKA MARATHON ~ ~ TEXACO MOBIL ARCO Alaska, In Prudhoe B'~q~ngineering Post Office Box 100360 Anchorage, Alaska 99510-0360 Telephone 907 263 4248 Donald F. Scheve Operations Engineering Manager March 28 1989 C. V. "Chat" Chatterton Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage,.Alaska 99501 Re: DS 4-19 Permit No.: 88-24 Dear Mr. Chatterton: Attached is the Application for Sundry Approvals detailing work to be performed on the above-reference well. Very truly yours, D. F. Scheve DFSI/WDM:sd Attachment cc: BP Exploration J. Gruber- ATO 1478 PI(DS4-19)Wl3 MAP, 2 Alaska 0il & Gas ~ns, C0mmissio~ ARCO Alaska, Inc. is a Subsidiary of AtlanticRichfieldCompany AR3B--6132-C CC.' D. E. Andrews, ATO 1528 J. G. Ambrose, ATO 1596~ J. W. Groth, ATO 1570:~ W. D. Mosteller, ATO B. J. Nye, ATO 1584 R. L. Payne, ATO 1592 RECEIVED 7Jaska 0il .&... _~¢as ~ns, Com~ssio~ ~. ~ Ancnora~ STATE OF ALASKA ALALEKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS 1. Type of Request: Abandon__ Suspend Operation shutdown Alter casing Repair well Plugging Change approved program__ Pull tubing Re-enter suspended well Time extension Stimulate Variance Perforate x Other 2. Name of Operator ARCO Alaska. Inc. 3. , 12. Address P.O. BOX 100360 Anch, AK 99510 . Location of well at surface 916'FSL, 258'FWL, Sec. 26, T11N, R15E, UM At top ot productive ~nterval 916'FSL, 258'FWL, Sec. 26, T11N, R15E, UM A~ e~ecuve aep~n 916'FSL, 258'FWL, Sec. 26, T11 N, R15E, UM Au To~a~ aep[n 916'FSL, 258'FWL, Sec. 26. T11N. R15E. UM Type of Well: Development . Exploratory Stratigraphic Service _x_ 6. Datum elevation (DF or KD) 57' RKB 7. Unit or Property name Prudhoe Bay Unit 8. Well number , DS 4-19 9. Permit number 88-;~4 10. APl number 50-029-21 791 11. Field/Pool Cretaceous- Undefined. feet Present well condition summary: Total depth: measured 7000 true vertical 7000 Effective depth: measured 6900 true vertical 6900 Casing Length Size Conductor 80' 20" S u rface 2952' 13-3/8" feet Plugs (meaf ,red)RECEIVED feet feet Junk (measured) feet ;:~,3SAA 0il & Gas Cons, Comnlissio[~ Cemented MeaA..,,~re~l~l~e , True vertical depth 2150# Poleset 115' 115' 2500 sx CS 111 & 2984' 2984' 600 sx CS 11 Production 6958' 9-5/8" 1350 sx Class G & R.q.q.q' 6993' Perforation depth: measured true vertical 6454'-6484', 6494-6514', 6562-6602', 6712-6732', 6798-6842', 6868-6882' 6454-6484', 6494-6514', 6562-6602', 6712-6732', 6798-6482', 6868-6882' Tubing (size, grade, and measured depth) 7"/5-1/2", L-80, tbg w/tail @ 3110' PacKers ano ~5~5V (,type Bna measured depth) FB-1 pkr @ 3000' (WLM) & WRDP-2-SSA-BAL-S SSSV @ 2211' 13. Attachments: Description summary of proposal x Detailed operations program BOP sketch 14. 16. Estimated date for commencing operation 15. March 28. 1989 If proposal was verbally approved Name of approver Date approved 17. I hereby.certify that the foregoing is true and correct to he best of my knowledge. Signed//'/,~~,~~ Title O perationsEngr. Manager FOR COMMISSION USE ONLY Status of well classification as: Oil__ Gas__ Suspended Service _ Water Disposal Date CONDITIONS OF APPROVAL: Notify Commission so representative may witness Plug integrity BOP ,Test Mechanical Integrity Test Approved by order of the Commissioner Form 10-403 Rev 06/15/88 IApproval No. ¢._ ~.~-- Location clearance Subsequent form required 10- '~,?~- ~,,~e0 C,_?'J ~u~".-.~,r C ~MIT~ Commission~.--~ ............. Date ~ SUBMIT IN TRIPLICATE ARCO Alaska, Inc. proposes to perforate DS 4-19 at selected intervals within the Tertiary Cretaceous. All wireline work will be done through a 5000 psi WP BOP/Lubricator, tested to 1.2 times the maximum expected surface pressure. The SSSV will be installed at the conclusion of the perforating and clean-up operation. The well is currently on injection. Produced water will be in the well during perforating operations. The expected reservoir pressure is approximately 2929 psi. Ref: BHCS 4/6/88 Proposed Perforation Intervals: 6366'-6388'MD 6394'-6404'MD 6434'-6454'MD 2 1. ~000 P.~I ?" WELLHead)CONN[C'I'OR IrLANG£ 2. 5000 PSI WIR£LIN£ R~S (VAR~BL~ SIZE) 3. 5000 P5~ 4 1/6" LUBR~TOR 4. 5000 PSI 4 1/6" FL~ TUBE PACK-Orr H]R£L ]NE BOP EOU ! PHE NT ARCO ALASKA, INC. P.O. BOX t803&8 ANCHORAGE, ALASKA 995~0 DATE: '~-6-89 REFERENCE: ARCO CASED HOLE FINAL£ 2-6 t 2-t t-88 2-7 t2-9-88 2-t3 ~ 2-t8-88 2-20 t 2-7-88 2-2~ t2-t2-88 2-24 ~ 2-8-88 4-t9 t 2-t 0-88 7-38 t 2-~ 8-88 t2-t t t 2-~ 7-88 PRODUCTION PROFILE PRODUCTION PROFILE PRODUCTION PROFILE PRODUCTION PROFILE PRODUCTION PROFILE PRODUCTION PROFILE INJECTION PROFILE PRODUCTION PROFILE PRODUCTION PROFILE ~2-t9 ~2-t9-88 INJECTION PROFILE t 4-28 t2-8-88 LEAK DE,TECI'ION SURYEY HAV A ii ALLY HOFFECK ~ Alas~:Oii t Gas Cons. ATO-t 529 ':,, '¥RAN$ APF'ROYED _~___ DISTRIBUTION RUN RUN RUN RUN RUN t, 'RUN t, RUN RUN RUN RUN RUN 5~ 5' 5' 5' 5' 5' 5' 5' 5' 5' CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CENTRAL FILES CHEVRON D & M EXTENSION EXPLORATION EXXON MARATHON MOBIL PHILLIPS F'B WELL FILE~ R & D SAF'C STATE OF ALASKA TEXACO STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION ..... ~ ~-~,-~,,, ~Vl~lr~ I IVl~ Vl~ I~~Vl~l~~ I I~1~ I~r.l~l~ I ~lilkl~l~ 1. Status of Well Classification of Service Well OIL [] GAS [] SUSPENDED [] ABANDONED [] SERVICEX] Disposal Well .~/~ 2. Name of Operator 7. Permit Number ARCO Alaska, Inc, 88-24 3. Address 8. APl Number P. 0, Box 100360, Anchorage, AK 99510 50- 029-21791 "~. Location of well at surface 9. Unit or Lease Name 916' FSL, 258' FWL, 5ec.26, T11N, R15E, UM Prudhoe Ba.y Unit .... At Top Producing Interval 10. Well Number 916' FSL, 258' FWL, Sec.26, T11N, R15E, UM 4-19 At Total Depth 11. Field and Pool 916' FSL, 258' FWL, Sec.26~ TllN~ R15E, UM Prudhoe Bay Field 5. Elevation in feet (indicate KB, DF, etc.) 6. Lease Designation and Serial No. Prudhoe Bay 0i 1 Pool RKB 60' ADL 28324 12. Date Spudded 13. Datem. D. Reached 14. Date Comp.,Susp. orAband. 115. Water Depth, if offshore l l6. No. of Completions 03/30/88 04/05/88 05/15/88'I N/A feet MSL1 17. Total Depth (MD+TVD) 18. Plug Back Depth (MD+TVD) 19. DirectionalSurvey J 20. Depth where SSSV set I 21. Thickness of Permafrost 7000'MD/7000'TVD 6900'MD/G900'TVD YES b--] NO~]~ 2211 i feet MD 1~)00' (approx) 22. Type Electric or Other Logs Run DIL/SONIC/GR/SP/CAL~ GR/CAL~ RFT, CBT/CET/GR, MWD 23. CASING, LINER AND CEMENTING RECORD -- SETTING DEPTH MD CASING SIZE WT. PER FT. GRADE TOP BOTTOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED . , 20" 91.5# H-40 Surf 11 ."; ' ~r~" 2! 50 # Po! eset 13-3/8" 68.0/72.0~ K-55/L-80 Surf ?qR/,' 17-!/?" 2500 s× CS !!! & 600 s× !CS !! 9-5/8" 47.0# L-80 ,g.,rf C~c~q~,, !2-!/~" !350 sx Class n & 300 s: CS I . 24. Perforations open to Production (MD-~TVD of Top and Bottom and 25. TUBING RECORD interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD) Perforated w/4 spf 7"/5-1/2" 3110' 3000' WLM 6454 ' -6484 ' MD/6454 ' -6484 ' TVD 6494 '-6514 'MD/6494 ' -6514'TVD 2~. ACI D, FRACTUR E, CEMENT SQUEEZE, ETC. 6562'-6602'MD/6562'-6602'TVD DEPTH INTERVAL (MD) AMOUNT & KIND OF MATEI~IA'L USED 671 2 ' -6732 ' MD/6712 ' -6732 ' TVD N/A 6798 ' -6842 ' MD/6798 ' -6842 'TVD I 6868 ' -6882 ' MD/6868 '-6882 'TVD 27. PRODUCTION TEST Date First Production ':IMethod of Operation (Fl°wing, gas lift, etc.) I N/A DateofTest Hours Tested PRODUCTION FOR OILIBBL GAS-MCF WATER-BBL CHOKE SIZE IGAS-OILRATIO TEST PERIOD I , , Flow Tubing Casing Pressure CALCULATED OIL-BBL GAS~MCF WATER-BBL OIL GRAVITY-APl (corr) Press. 24-HOUR RATE $' 28. CORE DATA , Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water, submit core chips. None * NOTE: Drilled RR & Tubing run 4/11/88. Perforated well 5/15/88. (Dani) WC5/006 Form 10-407 Rev. 7-1-80 CONTINUED ON REVERSE SIDE Submit in duplicate 29. 30. GEOLOGIC MARKERs FORMATION TESTS NAME Include interval tested, pressure data, all fluids recovered and gravity. MEAS. DEPTH TRUE VERT. DEPTH GaR, and time of each phase. N/A See attached sheet for RF~ data. l 31. LIST OF ATTACHMENTS Addendum (dated 5/24/88), [~W-I)(for inclinat±on data, 2 copies) 32. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed ~,1~),~./ .L~/)~-.A ? Title Associate Enoineer Date ~.~r. · - ~.-~_~ - INSTRUCTIONS General' This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Item 1' Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). Item 23' Attached supplemental records for this well should show the details of any multiple stage cement- ing and the location of the cementing tool. Item 27' Method of Operation' Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In- jection, Gas Injection, Shut-in, Other-explain. Item 28: If no cores taken, indicate "none". Form 10-407 Well Completion or Recompletion DS 4-19 (Cont'd.) Report and Log Item 30 - Formation Tests: RFT Results Depth (Ft) 1942.0 3865.0 4165.0 4260.0 4480.0 4745.0 4879.0 5095.0 5200.0 5265.0 5309.0 5420.0 5512.0 5650.0 5797.0 5944.0 5975.0 6012.0 6111.0 6133.0 6164.0 6270.0 6340.0 6374.0 6460.0 6580.0 6723.0 6807.0 6873.0 6919.0 6807.0 6450.0 5640.0 3920.0 Hydro- Static Pressure (PSI) 1947.43 2097.32 2145.43 2257.46 2392.67 2463.83 2567.07 2620.31 2647.52 2675.58 2725.64 2769.75 2839.87 2906.03 2983.21 2999.35 3019.31 3078.61 3089.79 3101.68 3140.70 3179.75 3199.82 3250.86 3302.94 3373.05 3416.13 3441.21 3464.32 3419.39 3236.31 2850.62 1977.72 Shut-In Pressure (PSI) 1717.95 1855.86 1896.90 2000.01 2097.17 2158.30 2270.56 2313.78 2352.93 2369.98 2411.10 2461.14 2559.26 2566.54 2660.62 2672.75 2689.79 2739.01 2746.06 2759.09 2806.10 2842.15 2857.22 2897.00 2920.43 2978.50 3070.00 3048.71 3051.79 3016.84 2890.00 2555.00 1744.90 WC5/OO6a ADDENDUM 4/08~88 4-19 Arctic Pak well w/50 bbls (300 sx) CS I and 135 bbls Arct i c Pak. Tst good. D~{t e~ Tele~o Oilfleld S( '~ Inc. 6116 Nielson way Anchorage, AK 99518 (907) 562-2646 April 7, 1988 JOB #621 ARCO ALASKA WELL: DS 4-19 LOCATION: PRUDHOE BAY RIG: DOYON 9 Attached please find a copy of the computer calculated MWD directional surveys for the above mentioned well. Teleco appreciates this opportunity to provide service to ARCO Alaska. Teleco is committed to providing the highest quality MWD service and we would welcome any comments or questions concerning these surveys or any of our other services. Sincerely, , A ..- ,.(,. %._ . .. ~ ,, . ~. Dave Reimer Field Service Supervisor . DR/el Enclosures A ~II41Al~ C("~M PANY TELECO OILFIELD SERVICES JOB 621 SURVEY CALCULATIONS **************************************** Date 04/06/88 Page 1 Company: ARCO ALASKA Well: DS4-19 Location: PRUDHOE BAY Rig: DOYON #9 TELECO Job # 621 TAK Grid Correction: Magnetic Declination: Total Correction: Proposed Direction: 0.00 degrees 31.00 degrees 31.00 degrees 0.00 degrees RADIUS OF CURVATURE CALCULATION **************************************** MEAS DIRECTION TRUE VERTICAL COORDINATES CLOSURE DOG LEG DEPTH INCL AZIMUTH BEARING VERT DEPTH SECTION N/S E/W DIST ANGLE SEVERITY feet deg deg deg/min feet . feet feet feet feet deg deg/100 e **************************************************************************************************** TIE-IN AT SURFACE 0.00 0.0 153.0 S 27 00 E 0.00 0.00 0.00N 0.00E 0.00 N 90.000E 0.000 0.4 153.0 S 27 00 E 150.O0 TELECO MWD 149.99 -0.46 241.00 0.1 219.4 S 39 24 W 240.99 -0.83 0.46S 0.23E 0.52 S 26.942E 0.266 · 0.83S 0.19E 0.86 S 13.194E 0.408 336.00 0.3 174.4 S 05 36 E 335.99 -1.14 1.14S 0.10E 427.00 0.2 160.7 S 19 18 E 426.99 -1.53 1.53S 0.1SE 520.00 0.5 33.1 N 33 06 E 519.99 -1.58 1.58S 0.64E 1.15 S 5.116E 1.54 S 6.995E 1.71 S 22.009E 0.253 O. 130 0.690 rELECO Job # 621 TAK 04/06/88 Page 2 MEAS DIRECTION TRUE VERTICAL COORDINATES CLOSURE DOG 'LEG DEPTH INCL AZIMUTH BEARING VERT DEPTH SECTION N/S E/W DIST ANGLE SEVERITY feet deg deg deg/min feet feet feet feet feet deg deg/100 t 611.00 1.2 214.2 $ 34 12 W 610.98 -1.10 1.10S 0.07W 1.11 S 4.009W 1.868 701.00 0.9 218.4 S 38 24 W 700.96 -2.43 2.43S 1.05W 2.65 S 23.372W 0.343 793.00 0.6 204.3 S 24 18 W 792.96 -3.46 3.46S 1.67W 3.84 s 25.855W 0.382 883.00 0.4 208.2 S 28 12 W 882.95 -4.16 4.16s 2.02W 4.63 S 25.922W 0.224 977.00 0.3 '193.8 S 13 48 W 976.95 -4.70 4.70S 2.23W 5.20 S 25.384W 0.146 1067.00 1.1 160.4 S 19 36 E 1066.94 -5.78 5.78s 2.17w 6.17 S 20.618W 0.962 1158.00 0.9 127.3 S 52 42 E 1157.93 -7.04 7.04S 1.25W 7.15 S 10.091W 0.661 1248.00 0.4 328.1 N 31 54 W 1247.92 -6.55 6.55S 0.71W 6.59 S 6.255W 1.424 1338.00 0.4 130.1 S 49 54 E 1337.92 -6.27 6.27S 0.38W 6.28 S 3.532W 0.878 1429.00 0.6 141.7 S 38 18 E 1428.92 -6.84 6.84S 0.16E 6.84 S 1.387E 0.246 1520.00 0.4 122.4 S 57 36 E 1519.91 -7.37 7.37S 0.75E 7.41 S 5.837E 0.285 1611.00 0.4 144.9 S 35 06 E 1610.91 -7.80 7.80S 1.21E 7.90 S 8.812E 0.174 1701.00 0.4 122.8 S 57 12 E 1700.91 -8.24 8.24S 1.66E 8.40 S 11.395E 0.170 1794.00 0.1 147.7 S 32 18 E 1793.91 -8.52 8.52S 1.94E 8.74 S 12.840E 0.338 1888.00 0.2 157.6 S 22 24 E 1887.91 -8.74 8.74S 2.05E 8.98 S 13.230E 0.111 1981.00 0.1 271.5 N 88 30 W 1980.91 -8.90 8.90S 1.94E 9.11 S 12.283E 0.279 2075.00 0.9 12.0 N 12 00 E 2074.90 -8.34 8.34S 1.49E 8.47 S 10.154E 0.983 I'SLECO ,]'ob # 621 TAK 04/06/88 Page 3 MEAS DIRECTION TRUE VERTICAL COORDINATES CLOSURE DOG LEG DEPTH INCL AZIMUTH BEARING VERT DEPTH SECTION N/S E/W DIST ANGLE SEVERITY feet deg deg deg/min feet feet feet feet feet deg deg/100 t ~**~************************************************************************************************ 2169.00 0.9 329.5 N 30 ~30 # 2168.89 -6.92 6.92S 1.26E 7.03 S 10.340E 2263.00 1.2 21.5 N 21 30 E 2262.88 -5.26 5.26S 1.13E 5.38 S 12.141E 2358.00 1.2 7.8 N 07 48 E 2357.86 -3.34 3.34S 1.63E 3.72 S 26.057E 2449.00 1.7 5.3 N 05 18 E 2448.83 2549.00 1.5 354.8 N 05 12 W 2548.79 -1.05 1.05S 1.89E 2.17 S 60.933E 1.73 1.73N 1.89E 2.57 N 47.581E 2643.00 1.1 354.1 N 05 54 W 2642.76 3.85 3.85N 1.69E 4.21 N 23.689E 2736.00 1.0 352.0 N 08 00 W 2735.75 5.54 5.54N 1.48E 5.74 N 15.014E 2829.00 0.7 0.4 N 00 24 E 2828.74 6.92 6.92N 1.39E 7.06 N 11.404E 2924.00 0.6 2.9 N 02 54 E 2923.73 7.99 7.99N 1.42E 8.12 N 10.117E 2982.00 0.3 25.7 N 25 42 E 2981.73 8.43 8.43N 1.53E 8.57 N 10.338E 3080.00 0.9 5.7 N 05 42 E 3079.72 9.41 9.41N 1.81E 9.59 N 10.908E 3174.00 0.6 18.0 N 18 00 E 3173.71 10.62 10.62N 2.06E 10.82 N ll.015E 3265.00 0.4 82.7 N 82 42 E 3264.71 11.10 ll.10N 2.64E 11.41 N 13.415E 3359.00 0.3 42.3 N 42 18 E 3358.71 11.36 11.36N 3.14E 11.78 N 15.471E 3454 . 00 O. 4 55 . 3 N 55 18 E 3453 . 71 11.74 11.74N 3 . 57E 12.27 N 16 . 949E 3548.00 0.5 85.1 N 85 06 E 3547.70 11.98 11.98N 4.26E 12.72 N 19.584E 0,694 1.021 0. 303 0. 553 0. 354 0.425 O. 120 0.348 0.110 0.595 0. 640 0.362 0.616 0.276 0. 138 0.270 3642.00 0.3 127.0 S 53 00 E 3641.70 11.81 11.81N 4.88E 12.77 N 22.452E 0.365 TE?.;.CO Job # 621 TAK 04/06/88 Page 4 MEAS DIRECTION TRUE VERTICAL COORDINATES CLOSURE DOG LEG DEPTH INCL AZIMUTH BEARING VERT DEPTH SECTION N/S E/W DIST ANGLE SEVERITY feet deg deg deg/min feet feet feet feet feet deg deg/100 t 3737 00 0.4 146.7 S '33'!1'18 E 3736.70 11.39 11.39N 5.27E 12.55 N 24.841E ~,~i',0.1 7 3831.00 0.3 181.5 S 01 30 W 3830.70 10.84 10.84N 5.42E 12.13 N 26.576E 0.245 3925.00 0.2 199.0 S 19 00 W 3924.70 10.44 10.44N 5.35E 11.73 N 27.137E 0.133 4019.00 0.3 219.8 S 39 48 W 4018.70 10.09 10.09N 5.15E 11.33 N 27.056E 0.146 .. 4112.00 0.2 161.8 S 18 12 E 4111.70 9.70 9.70N 5.08E 10.95 N 27.626E 0.279 4207.00 0.2 134.7 S 45 18 E 4206.70 9.42 9.42N 5.25E 10.79 N 29.127E 0.102 4300.00 0.4 181.5 S 01 30 W 4299.69 8.99 8.99N 5.43E 10.50 N 31.131E 0.324 4393.00 0.1 209.9 S 29 54 W 4392.69 8.60 8.60N 5.32E 10.11 N 31.734E 0.340 4488.00 0.4 230.3 S 50 18 W 4487.69 8.29~ 8.29N 5.05E 9.71 N 31.381E 0.'325 4582.00 0.4 233.9 S 53 54 W 4581.69 7.88 7.88N 4.53E 9.10 N 29.920E 0.000 4675.00 0.4 223.0 S 43 00 W 4674.69 7.45 7.45N 4.05E 8.48 N 28.529E 0.085 4770.00 0.9 227.2 S 47 12 W '4769.68 6.69 6.69N 3.29E 7.46 N 26.167E 0.528 4863.00 1.1 227.2 S 47 12 W 4862.67 5.59 5.59N 2.10E 5.97 N 20.578E 0.217 4956.00 1.2 215.6 S 35 36 W 4955.65 4.19 4.19N 0.86E 4.28 N 11.664E 0.272 5048.00 1.1 197.6 S 17 36 W 5047.63 2.54 2.54N 0.04E 2.54 N 0.922E 0.406 5141.00 1.0 211.7 S 31 42 W 5140.61 1.00 1.00N 0.66W 1.20 N 33.463W 0.298 5236.00 1.1 214.9 S 34 54 W 5235.60 -0.44 0.448 1.61W 1.67 S 74.694W 0.125 TET,~,CO Job # 621 TAK 04/06/88 Page 5 MEAS DIRECTION TRUE VERTICAL COORDINATES CLOSURE DOG LEG, DEPTH INCL AZIMUTH BEARING VERT DEPTH SECTION N/S E/W DIST ANGLE SEVERITY feet deg deg deg/~in feet feet feet feet feet deg deg/100 t 5329.00 1.0 213.5 S'33~30 W 5328.58 -1.84 1.84S 2.57W 3.16 S 54,316W ,~i0.113 5423.00 0.7 215.9 S 35 54 W 5422.57 -2.99 2.99S 3.36W 4.50 S 48.355W 5515.00 0.5 191.7 S 11 42 W 5514.57 5610.'00 0.4 191.0 8 11 00' W 5609.56 · 5704.00- 0.4' 228.9 S 48 54 W 5703.56 0.323 -3.87 3.87S 3.75W 5.39 S 44.123W 0.347 -4.60 4,60S 3.90W 6.03 S 40.284W 0.110 -5.16 5.16S 4.22W 6.66 S 39.291W 0.276 5799.00 0.7 215.2 S 35 12 W 5798.56 -5.83 5.83S 4.83W 7.57 S 39.622W 5894.00 0.6 228.9 S 48 54 W 5893.55 -6.63 6.63S 5.55W 8.65 S 39.924W 0.343 0.195 6549.00 0.2 119.8 S 60 12 E 6548.53 -9.77 9.77S 7.53W 12.33 S 37.633W 0.217 6643.00 0.3 123.8 S 56 12 E 6642.53 -9.98 9.98S 7.18W 12.30 S 35.730W 0.111 6738.00 0.2 340.7 N 19 18 W 6737.53 6830.00 0.6 15.9 N 15 54 E 6829.53 6456.00 0.3 161.8 S 18 12 E 6455.54 -9.46 9.46S 7.78W 12.25 S 39.443W 0.253 6362.00 0.3 208.5 S 28 30 W 6361.54 -8.98 8,98S 7.74W 11.86 S 40.746W 0.297 6267.00 0.2 273.6 N 86 24 W 6266.54 -8,79 8.79S 7.39W 11.49 S 40.066W 0.279 -9.79 9.79S 6.93W 12.00 S 35.301W 0.501 -9.16 9,16S 6.95W 11.50 S 37.198W 0.490 6174.00 0.2 193.1 S 13 06 W 6173.54 -8.61 8.61S 7.15W 11.20 S 39.715W 0.331 5986.00 0.7 227.9 S 47 54 W 5985.55 -7.32 7.32S 6.33W 9.68 S 40.834W 0.114 6079.00 0.5 210.3 S 30 18 W 6078.54 -8.08 8.08S 6.94W 10.65 S 40.676W 0.292 TELECO Job~ # 621 TAK 04/06/88 Page 6 MFJ~S DI1/~CTION TRUE VERTICAL COORDINATES CLOSURE DOG LEG, DEPTH INCL AZI]~JTH BEA1/ING VERT DEPTH SECTION N/S E/W DIST ANGLE SEVERITY feet deg deg deg/min feet feet feet feet feet deg deg/100 e 6922.00 0.3 7.4 N 07~,124 E 6921.53 -8.45 8.45S 6.80W 10.85 S 38.842W 6982.00 0.4 16.6 N 16 36 E 6981.53 -8.09 8.09S 6.73W 10.53 S 39.737W o. ;3 0.198 2000 ~ BO00 4Ooo 5000 6000 7000 80OO 9000 - 1000 ' TELECO OilField. Services VERTICAL PROJECTION . ~..-.0'. " 1000 2000 9000 4000 5000 V~RTTCAL S~TION (~t~ TELECO 0 i 1 ~ i ~ 1 d S~rv i PL^N VIEW 2ooi' :;i,i~:i-~,' ~oo ~o o 50 100 WEST (Ft) 100 5O 5D loo '~ i-- 150 tn 200 250 300 950 STATE OF ALASKA ALAS,,~ OIL AND GAS CONSERVATION COMN,,$SION REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown ¢q., Stimulate [] Alter Casing [] Other [] 2. Name of Operator ARCO Alaska, inc. 3. Address P.0. Box 100360, Anchorage, AK 99510-0360 4. Location of well at surface 916' FSL, 258' FWL, Sec.26, T11N, R15E, UN At top of productive interval 916' FSL, 258' FWL, Sec.26, T11N, R15E, UM At effective depth 916' FSL, 258' FWL, Sec.26, T11N, R15E, UM At total depth 916' FSL, 258' FWL, Sec.26, T11N, R15E, UH 11. Present well condition summary Total depth: measured true vertical 12. 7000 'MD 7000 'TVD 13. Effective depth: measured 6900 'MD true vertical 6900'TVD Casing Length Size Conductor 80' 20" Surface 2952 ' 13-3/8" Production 6958' 9-5/8" Plugging ~ PerforateX3 Pull tubing feet feet 5. Datum elevation (DF or KB) RKB 60 ' Feet 6. Unit or Property name Prudhoe Bay Unit 7. Well number 4-19 8. Approval number 8-336 9. APl number 501 029-21791 10. Pool Prudhoe Bay Oil Pool feet feet Plugs(measured) None Junk (measured) None Cemented Measured depth True Vertical depth 2150# Poleset 115'MD 115'TVD 2500 sx CS I I I & 2984 'MD 2984'TVD 600 sx CS II 1350 sx C1 ass G & 6993'MD 6993'TVD 300 sx CS I Perforation depth: measured 6454'-6484'MD, 6494'-6514'MD, 6562'-6602'MD 6712'-6732'MD, 6798'-6842'MD, 6868'-6882'MD true vertical 6454'-6484'MD, 6494'-6514'MD, 6562'-6602'MD 6712'-6732'MD, 6798'-6842'MD, 6868'-6882'MD Tubing (size, grade and measured depth) 7"/5-1/2", L-80, tbg w/tail ~ 3110' Packers and SSSV (type and measured depth) FB-1 pkr ~ 3000' IWLM) & WRDP-2-SSA-BAL-S SSSV (~ 2211' Stimulation or cement squeeze summary N/A Intervals treated (measured) Treatment description including volumes used and final pressure N/A Prior to well operation Subsequent to operation Representative Daily Average Production or Iniection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure 14. Attachments (Perforat. i on Su~mmary) Daily Report of Well Operations ~ 15. I hereby certify that the foregoing is true and correct to the best of my knowledge Tubing Pressure Form 10-404 Rev. 12-1-8 Copies of Logs and Surveys Run [~ MWD Title Associ ate Engineer (Dani) SW03/003 Date ~-/~--~ Submit in Duplicate Well Number: 4-19 Type of Well: Produced water disposal well (Cretaceous) Perforation Intervals (MD = TVD): 6454'-6484' MD .~ o 4 spf 6494'-6514' MD ~-~ 4 spf 6562'-6602' MD u,~ 4 spf 6712'-6732' MD ~.'~ 4 spf 6798'-6842' MD ~w 4 spf 6868'-6882' MD~_~, 4 spf Production Tests: Not applicable Summary of O0er~,l,.,,~S 4-19' Began perforating operations on 15 May 1988. RU perforating unit, pressure tested BOP's and lubricator to 3000 psi. RIH with gun #1, attempted to tie in but definitive collar indication not seen. POOH, rigged up to run PFC, RIH with gun #1, tied in with GR, shot interval 6712'-6732' with 80 shots (4 SPF). POOH, all shots fired. RIH with gun #2 (A & B), tied in to flag and logged collars, shot interval 6868'-6882' with 56 shots (4 SPF) and interval 6837'-6842' with 20 shots (4 SPF). POOH, all shots fired. RIH with gun #3, attempted to tie in but collars not apparent. POOH, rigged up to run PFC, RIH with gun #3, tied in with GR, shot interval 6582'-6602' with 80 shots (4 SPF). POOH, all shots fired. RIH with gun #4, tied in and shot interval 6811'-6837' with 104 shots (4 SPF). POOH, all shots fired. RIH with gun #5, tied in and shot interval 6562'-6582' with 80 shots (4 SPF). POOH, all shots fired, RD for night. Resumed operations 16 May 1988. RU, RIH with gun #6, tied in and shot interval 6798'-6811' with 52 shots (4 SPF). POOH, all shots fired. RIH with gun #7, tied in and shot interval 6474'-6484' with 40 shots (4 SPF). POOH, all shots fired. RIH with gun #8, tied in and shot interval 6494'-6514' with 80 shots (4 SPF). POOH, all shots fired. RIH with gun #9, tied in and shot interval 6454'-6474' with 80 shots (4 SPF). POOH, all shots fired. RD and secure well. ~.~. Reference: BHCS 4~6~88 ~ ~?~ F',.O., BOX ANChlORAGE:: At...A2K A 9 9 E..: ~ A'I" t A .'-..." REFERFNP. F' ,~Rr..r) I)TRFP.,T.'[F)NAI. DATA 7-?9 ~-t -RR Mt~ID D'IT RI--r.T'F rIN~! :,71 tF~:VFY FtF'N'T'RAI CHFVR~N EXTFN~IflN F~Pt..nR~'FT~N M~TI.. :",: fi; .D.. N 1' I:~ A I... F' 1, I. F' S · "- r.'. Fl E' V R' O N '"' 1) & H · 1~. . FXTE:N,.%.' ]: []IN F:¥1::'I.. fll:.~t~'l" T N .P.~!:~' R TI4 f'l N STATE OF ALASKA ALASK,. OIL AND GAS CONSERVATION COMb,. ,SION APPLICATION FOR SUNDRY APPROVALS 1. Type of Request: Abandon [] Suspend [] Operation Shutdown iX Re-enter suspended well ~ Alter casing ~ Time extension © Change approved program [] Plugging [] Stimulate~r~ Pull tubing ~ ,~, Amend order ~ m Perforate [] Other 2. Name of Operator ARCO Alaska, Inc. 3. Address P. 0. Box 100360, Anchorage, AK 99510-0360 4. Location of well at surface 916' FSL, 258' FWL, Sec.26, TllN, R15E, UN At top of productive interval 916' FSL, 258' FWL, Sec.26, TllN, ELSE, UN At effective depth 916' FSL, 258' FWL, Sec.26, T11N, R15E, UN At total depth 916' FSL, 258' FWL, Sec.26, T11N, R15E, UM 5. Datum elevation (DF or KB) RKB 60 ' 6. Unit or Property name Prudhoe Bay Unit 7. Well number 4-19 8. Permit number 88-24 9. APl number 50-- 029-21791 10. Pool Prudhoe Ba~, Oil Pool feet 11. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical Casing Conductor Surface 7000'MD feet 7000'TVD feet Production 6900 ' MD feet feet 6900'-TVD Plugs (measured) None Junk (measured) None Length Size Cemented Measured depth 80' 20" 2150# Poleset 115'MD 2952' 13-3/8" 2500 sx CS III & 2984'MD 600 sx CS il 6958' 9-5/8" 1350 sx Class G & 6993'MD 300 sx CS I ~ue Verticaldepth 115'TVD 2984'TVD 6993'TVD Perforation depth: measured Non e true vertical None Tubing (size, grade and measured depth) 7"/5-1/2", L-80, tbg w/tail @ 3110' Packers and SSSV(type and measured depth) FB-1 pkr (~ 3000' (WLM) & WRDP-2-SSA-BAL-S SSSV ~ 2211' Gas ConS~ 60t-[m-tisstor~ hnchoraCe 12.Attachments Well Hi story Description summary of proposal [] Detailed operations program ~ BOP sketch 13. Estimated date for commencing operation October, 1988 --~'~-,~e"l'"~ ..... ~,~___,,, u,~~.~ t~u'~Eu~-'~ 14. If proposal was verbally approved Form No./~" t)/~,Z/Date(:[.~//~~ Name of approver Date approved 15. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed 4~/~/Y)/)k.J ~/J~ Title ASsociate EFIgineer Commission Use Only (Dan i ) 5A3/86 Date Conditions of approval Notify commission so representative may witness [] Plug integrity [] BOP Test [] Location clearance Approved Copy Approved by ~~, '~~' ~~"~__ _ Form 10-403 Rev 12-1-85 Returned. ,, ,_.SW--- ~ '*'~' - by order of Commissioner the commission Date Su~brrfrt in triplicatu ARCO Oil and Gas Company Daily Well History-Final Report Instructions: Prepare and submit the "Final Report" on the first Wednesday after allowable has been assigned or well is Plugged, Abandoned, or Sold. "Final Report" should be submitted also when operations are suspended for an indefinite or appreciable length of time. On workovers when an official test Is not required upon completion, report completion and representative test data in blocks provided. The "Final Report" form may be used for reporting the entire operation if space is available. Accounting cost center code District County or Parish State ARCO Alaska, Inc. I NORT~ SLOPE BOROUGH AK Field ILease or Unit I Well no. PRUDHOE BAY FIELD I ADL: 28324 DS 4-19 Auth. or W.O. no. I Title AS2131 I DRILL Operator ARco Spudded or W,O. begun SPUD Date and depth as of 8;00 a.m. 04/12/88 ( TD: 7000'( SUPV:JE API: 50-029-21791 A.R.Co. W.I. rTotal number of wells (active or inactive) on this Icost center prior to plugging and I 22,0000 labandonment of this well I Date IHour I Prlor status if a W.O. 03/30/88 / 1000 Complete record for each day reported DOYON 9 o) RIG RELEASED 9-5/8"@ 6993' MW: 0.0 VIS: FINISH ND BOPE'S. RIG RELEASED AT 1900 HRS ON 4/11/88. WRDP-2-SSA-BAL-S SSSV @ 2211', FB-1 PKR @ 3000'WLM DAILY:S136,282 CUM:$2,027,439 ETD:S2,027,439 EFC:$1,677,000 Old TD Released rig Classifications (oil, gas, etc.) Producing method Potential test data New TD Date tPB Depth Kind of rig IType completion (single, dual, etc.) Official reservoir name(s) Well no. Date Reservoir Producing Interval Oil or gasTest time Production Oil on test Gas per day Pump size, SPM X length Choke size T.P. C.P. Water % GOR Gravity Allowable Effective date corrected The above is correct For form prepara~n and distribution, see Procedures I~nual, Section 10, Drilling, Pages 86 and 87. AR3B-459-3-C INumber all daily well history forms as they are prepared for each well. consecutively iPage no. DIvlNon el AllantlcRIchfleldCompany ARCO Oil =-..,, Gas Company Daily Well History--Interim Instructions: This form is used during drilling or workover operations. If testing, coring, or perforating, show formation name in describing work performed. Number all drill stem tests sequentially. Attach description of all cores. Work performed by Producing Section will be reported on "Interim" sheets until final completion. Report official or representative test on "Final" form. 1) Submit "Interim" sheets when filled out but not less frequently than every 30 days, or (2) on Wednesday of the week in which oil string is set. Submit weekly for workovers and following setting of oil string until completion. District Field ARCO Alaska, Inc. PRUDHOE BAY FIELD County or Parish NORTE SLOPE BOROUGH Lease or Unit DS 4-19 StateAK JWell no. Date and deptll as of 8:00 a.m. 04/10/88 ( TD: 7000'( SUPV:JE 04/11/88 ( TD: 7000'( SUPV:JE Complete record for each day while drilling or workover in progress DOYON 9 LD 5" DP 9-5/8"@ 6993' MW: 9.0 VIS: FINISH DISP HOLE W/ 9.0 BRINE. LD 5" DP. TEST CSG TO 3000 PSI. OK. RU SOS AND RIH W/ CBT/CET/GR AND LOG F/ 6890' TO 2984' RIH W/ GR AND JB. MU PKR AND RIH AND SET SAME W/ 3000 PSI. LD 5" DP. DAILY:S630,00 CUM:$1,746,002 ETD:$17,460,020EFC:$14,037,018 NIPPLE DOWN BOPE 9-5/8"@ 6993' MW: 9.0 VIS: FIN LD DP. RU AND RUN 7" TBG. MU HANGER AND TEST SAME TO 5000 PSI. OK. DISP BRINE W/ DIESEL. TEST ANNULUS TO 2500 PSI. OK. TEST TBG TO 3000 PSI. SLOW LEAK. PULL TBG OUT OF PKR. STAB BACK IN AND RELAND TBG. TEST ANNULUS TO 2500 PSI. OK. TEST TBG TO 3000 PSI F/30 MINS. OK. BACKOUT LANDING JT AND LD SAME. PREP TO ND BOPE. DAILY:S145,155 CUM:$1,891,157 ETD:S1,891,157 EFC:$1,677,000 The above is correct Signature -- For form prepa~,~ion and -distribution see Procedure~,,Manual Section 10. Drilling, Page~,,86 and 87 Date 4-22 -~ ~ ~it,e ASSOCIATE ENGINEER AR3B-459-2-B Number all daily well history forms consecutively as hey are prepared lot each well. IPage no. :. ARCO Oil an,. ,.~as Company Daily Well History--Interim Instructions: This form is used during drilling or workover operations. If testing, coring, or perforating, show formation name In describing work performed. Number ail drill stem tests sequentially. Attach description of all cores. Work performed by Producing Section will be reported on "lnlarim" sheets until final completion. Report official or representative test on "Final" form. 1) Submit "Interim" sheets when filled out but not less frequently than every 30 days, or (2) on Wednesday of the week in which oil string is set. Submit weekly for workovers and following se.tting of oil strin{;i until completion. Field District [County or Parish IState ARCO Alaska, Inc. I NORTH SLOPE BOROUGH I AK I Lease or Unit I DS 4-19 PRUDHOE BA: Date and depth as of 8:00 a.m. 04/05/88 ( TD: 5913'( 1 SUPV:BB 04/06/88 ( ~ TD: 7000'( 1( SUPV:BB 04/07/88 ( TD: 7000'( SUPV:JE 04/08/88 ( 1 TD: 7000'( SUPV:JE 04/09/88 ( 11 TD: 7000'( SUPV:JE FIELD Complete record for each day while drilling or workover in progress DOYON 9 ,) ) 87) PREPARE TO REAM 13-3/8"@ 2984' MW: 9.1 VIS: 30 DRILLED 12-1/4" HOLE TO 5913'. POOH WET LOOKING FOR WASHOUT. FOUND BIT JETS WASHED OUT. CHANGED BIT & RIH TO 13-3/8" SHOE. BREAK CIRCULATION. PUMP PRESSURE 1900 PSI LOW. CHECK PUMPS. POOH WET. FOUND BLOWN CENTER JET. CHANGED BIT. RIH. BREAK CIRCULATION @ SHOE. RIH TO 5850'. DAILY:S43,450 CUM:$573,811 ETD:S573,810 EFC:$1,677,001 POOH FOR LOGS 13-3/8"@ 2984' MW: 9.4 VIS: 36 REAMED F/5850'-5913'. DRILLED & MWD SURVEY TO 7000'. CIRCULATE. SHORT TRIP TO 5085'. CIRCULATE & CONDITION HOLE FOR LOGS. POOH FOR LOGS. DAILY:S40,924 CUM:$614,735 ETD:S614,735 EFC:$1,677,000 RD DRESSER ATLAS 13-3/8"@ 2984' MW: 9.3 VIS: 35 POH. PULLED BHA & LD TELECO MWD. RU DRESSR ATLAS. RAN DIL/SONIC/GR/SP/CAL FROM 7000' TO 13-3/8" SHOE WITH REPEAT FROM 7000'-6000'. RAN GR/CAL F/7000'- 2984' WITH REPEAT F/7000'-6800'. MADE 2 ATTEMPTS TO RUN RFT. PROBLEM WITH PRESSURE TRANDUCER ON THE FIRST RUN AND UNABLE TO SEAT THE TOOL IN CSG ON THE SECOND RUN. POH. REPLACED PACKER RUBBER & EQUALIZING VALVE. RAN #3 RFT. MADE 34 TESTS WITH 1 FAILURE. RD DRESSER ATLAS. HOLE TOOK 70 BBLS OF FLUID WHILE LOGGING. DAILY:S93,524 CUM:$708,259 ETD:S708,259 EFC:$1,677,000 DISPL. STAGE #1 CMT JOB 9-5/8"@ 6993' MW: 9.3 VIS: 35 FINISHED RIGGING DOWN DRESSER ATLAS. RIH TO 2950' BREAK CIRCULATION. RIH TO 6940'. REAMED F/6940'-7000' CIRCULATE & CONDITION HOLE. PUMPED DRY JOB. POOH. LD BHA. INSTALLED 9-5/8" PIPE RAMS & TESTED DOOR TO 2000 PSI. RU & RAN 9-5/8" CASING WITH SHOE @ 6992'. CMTD CASING WITH 820 SX CLASS G. DROPPED TOP PLUG. PUMPED 5 BBLS WATER & DISPLACE WITH MUD @ 7 BPM. DAILY:S252,805 CUM:$961,064 ETD:S916,064 EFC:$1,722,000 DISPLACING MUD 9-5/8"@ 6993' MW: 9.8 VIS: 40 FIN DISP AND BUMP PLUG. CIRC. MIX AND PUMP 75 BBLS OF MSC-4 SPACER. CMT W/530 SX OF CLASS G CMT. PUMP PLUG W/1500 PSI. CIP AT 1030 HRS 4/8/88. RU TO PUMP DOWN 9-5/8" BY 13-3/8" ANNULUS. MIX AND PUMP 300 SX OF AS I FOLLOWED BY 135 BBLS ARCTIC PACK. CIP AT 12:35 HRS, 4/8/88. ND BOPE. NU TBG HEAD AND TEST SAME TO 3000 PSI. MU BHA. RIH TO DV TOOL. -~ DAILY:S154,938 CUM:$1,116,002 ETD:Si, Ii6,002 EFC:$1,677,000 Well no. The above is correct For form preparatj~6'/~ and distribution see Procedures ¥~hual Section 10, Drilling, Pages 86/and 87 IDate ITitle 4-2Z-_-?;3 ASSOCIATE ENGIN~-.fi AR3B-459-2-B INumber all daily well history forms consecutively as they are prepared for each well. IPage no. ARCO Oil ahU Gas Company Well History - Initial Report - Daily Instructions: Prepare and submit the "Initial Rel3ort" on the first Wednesday afte! a well is spudded or workover operations ere started. Daily work prior to spudding should be summarized on the form giving inclusive dates only. District ICounty, parish or borough late ARCO Alaska, Inc. I NORTH SLOPE BOROUGH I Field ILease or Unit I ADL: 28324 j Title I DRILL & COMPLETE PRUDHOE BAY FIELD Auth. or W,O. no. AS2131 DS 4-19 Well no. Operator IARCO W.I. ARCO J 22.0000 Spudded or W.O. begunSPUD IDate 03/29/88 IH°ur 1700 IPri°r status if a w'O' Date and depth as of 8:00 a.m. 03/30/88 ( TD: 0'( SUPV:JE 03/31/88 ( ' TD: 1394' ( 1: SUPV:BB 04/01/88 ( TD: 2816'( 1 SUPV:BB 04/02/88 ( TD: 3000'( SUPV:BB 04/03/88 ( TD: 3000'( SUPV:BB 04/04/88 ( TD: 4632' ( 1 SUPV:BB Complete record for each day reported DOYON 9 ,) o) ) 94) ) 22) ) 84) ) o) ;) ;32) PREPARE TO SPUD 20"@ 110' MW: 8.6 VIS:250 ACCEPTED RIG @ 1700 HRS, 3/29/88. WELDED ON STARTING HEAD. NU RISER, FLOWLINE, & DIVERTER. FUNCTION TESTED DIVERTER. MIXED SPUD MUD. PU BHA. MU UPPER AND LOWER JARS. ESTIMATE SPUD @ 0800 HRS. DAILY:S54,092 CUM:$54,092 ETD:S54,092 EFC:$1,677,000 DRILLING 20"@ 110' MW: 9.3 VIS:280 SPUDDED WELL @ 1000 HRS, 3/30/88. DRILLED 17-1/2" HOLE TO 180'. FLOW LINE PACKED OFF. FLUSHED FLOWLINE. HOOKED UP JETS TO FLOWLINE. DRILLED 17-1/2" HOLE TO 1394' DAILY:S59,791 CUM:$113,883 ETD:S113,883 EFC:$1,677,000 DRILLING 20"8 110' MW: 9.5 VIS: 80 DRILLED 17-1/2" HOLE TO 1686'. POOH. LD SHOCK SUB & CHANGED BIT.' TIH. CONTINUED DRILLING 17-1/2" HOLE TO 2526'. LOST 1700 PSI PUMP PRESSURE. POH. CHECKED BIT. MU BIT & BHA; TIH. CONTINUED DRILLING & MWD SURVEY TO 2816'. DAILY:S52,570 CUM:$166,453 ETD:S166,453 EFC:$1,677,000 ND DIVERTER LINES 13-3/8"8 2984' MW: 9.5 VIS: 80 DRILLED 17-1/2" HOLE TO 3000'. CIRC. RAN GYRO. CIRC. & CONDITION HOLE FOR 13-3/8" CASING. LD TELECO. RAN 70 JTS 13-3/8", 72~, L-80, BTC,' AND'i JT 13-3/8", 68#, K-55, CASING WITH SHOE @ 2984'. CMTD CASING WITH 2500 SX CS III & 600 SX CS II. CIP @ 0030 HRS, 4/2/88. ND DIVERTER LINES. ND DIVERTER & SET BACK. DAILY:S276,499 CUM:$442,952 ETD:S442,952 EFC:$1,677,000 DRILLING WIPER PLUGS 13-3/8"@ 2984' MW: 0.0 VIS: FINISHED ND DIVERTER. INSTALLED FMC WELLHEAD. NU BOPE & TESTED TO 5000 PSI. TEST WITNESS WAIVED BY H. HAWKINS, AOGCC. PULLED TEST PLUG. MU BHA. RIH. TAGGED CMT PLUGS @ 2884'. TESTED CASING TO 2500 PSI. DRILLED WIPER PLUGS. DAILY:S41,748 CUM:$484,700 ETD:S484,700 EFC:$1,677,000 DRILLING 13-3/8"8 2984' MW: 9.1 VIS: 30 DRILLED WIPER PLUGS, FC, CMT & FS. DRILLED 10' NEW FORMATION TO 3010'. CIRC. & COND. MUD. PERFORMED LOT TO 12.8 PPG EMW. DRILLED 12-1/4" HOLE TO 4609'. PUMPED DRY' JOB. TRIP FOR BIT ~6. CONTINUED DRILLING 12-1/4" HOLE TO DAILY: $45,661 CUM: $530,361 ETD: $5.3~' 361 ~ .- ~FC~. $~; 677,000 The above is correct For form preparatig'ff and distributi~3n, - see Procedures M~jl'ual, Section 10, Drilling, Pages 86~nd 87. · I Date AR3B-459-1-D Number all daily well history forms consecutively as they are prepared for each well, iPage no, AIRCO ALASKA, INC~ '-"~'~- F'~O, BOX I00J60 ANCHORAGE~ ALASKA 99510 DATE: 4-t5-88 , REFERENCE: ARC[) CA,~ED H[]I...E FINAL CBT F~'I.JN t: ..5" CF'F/(?.AL T F'E~' LOG RI. IN CBT i:~I.JN t C F:' T R I..I N F:'F:'C RI.IN F'FC I CI "' '::' ' . ,.i' . :!7' . ::'. DATA, aska 0il & Gas Cons. Commission.,,,rolm Anchorage · .I...EASF.:. ,?I(';N ~NT)I:?F..7. TIIFk'.N F;,'Fi C .F. 7 i1' V F' ~ P, Y I..IAVE A NI F:' E G (.'; Y A 'T' f:).- t "~ ''~ c~ ..¢ ..:. -- 'FRAN,.T :) ~) F..I 27( ./~ ~ A P F' I.l: 0 V E D ....................................................... I) .1; ,t." T IR ]: ..r.~ L! T T 0 N ,~ f.:l-.I ,~ [':.1-! A'T'I.,, A,.T · .,-'"' ('F'NI'RA/...., .... 5 ' C I.-I r.-.'; V r-~ U N I) & M ~",,. E X X F.) N HAr~'A'rl.40N ~ MOT~ T.!... Drilling Co~Ri-i L~,cation, C, an~.ral.__~~ Well Sign~ General Rousel{eeplng. ~ Rig.~p/ ~'."ud ~,st ems __ Tzip Tank Flow Honitor BOPE Stack Annular Pre Pipe K~ms Blind Rams ACCUP?OLATOR SYSTEM Full r~,~,.,,~ Pr~!'..sur~ Pre~$ure After Closure Pump Inc~: c)om. F~'eS~ 200 Controls; ~aster .... Test ~esults: ~ai~ure'~-~-~~'g'~'~-'' .~-,~ ~:,~__~h-r~ .............. Repair or Rep!ace:eat, of fai]~u equipman~ Co~is~ion office notified, .__ Distr~bt,~fon oj CC , cc - Operator cc - Supervisor -;' - gaily and r~oor Sefe~v Ball iy~,~ ~ Test Cbc.%e E~: ~'': ~ '/ ,. E c E ARCO Alaska, Ir March 29, 1988 Mr. C. V. Chatterton commi ssi oner state of Alaska Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 SUBJECI' conductor As-Built Location Plat- DS 4-19 Dear Mr. Chatterton: · Enclosed is an as-built location plat for the subject well questions, please call me at 263-4944. SincerelY, Gruber Associate Engineer jG'pk GRU13/5 Enclosure you have any ,q,~sk~ Oil & Gas Cons. Commissio~ Anchorage SECTION 2~, T. II N., R. /§ E.,/ /"', ,0 25 U'MI, ~ MErIDIaN, ~, ~S'~ ~ .~ 0~ / /N. 80 ~ - 02S ~/ 0~ 0 EX/STING /FUTURE WELL ~o ~ ~ ~ o~ ~ ~ ~. ~0~~0~ ~-t~ ~ELOC~FE~ ~'~5'88. ~ REFER TO D.S.~ CONDUCTOR ~S 8U,'LT DATED 10.~9.85 BY ~UNSBURY ~ ASSOC. ~S BUILT COND. 4-/9 Y =5,9~2,786.18 L~E = 70~1~'26.381 " 256' FW L X= 71~ , 05~.0~ LONG.=I48°I6' ~5.205" 907 '~9 (EXIST. 20" DIA. COND.) CELLAR BOX ELEK=21. 2 FORMER COND. 4-19 Y= 5,952,7~1. Y~ LA~= 70°16'~6.436 " 254'~W ' X= 7/ ~,057.60 LONG.~/4E°/6'35. E44" (16" Ol~. CONDUCTOR ~8~NDONED IN PL~C~.) R E C ~:_ i'~ ~ '':'~ ~:: ~ ~ ...... ~ ~_~ At'tci~orage ~..' , ~ -.~._ ,,, I HEREBY CERTIFY THAT I AM ~. z 49~~ ~ ~ ARCO Alaska, lnc. PROPERLY REGISTERED AND ,,., .. lee eeeeleeleeeellllll~ SURVEYING I~ THE STATE OF A~SKA AND THAT THIS P~T ~.~". LS-5~ .'~ CONDUCTOR REPRESENTS AN AS-BUILT SURVEY ~ ~ .., ' .....~- ~ AS BUlL r LOCA T/ON DIMENSIONS ANO OTHER DETAILS ARE CORRECT, AS OF: ~ - 2 5 - ~a. ~EERS · ~A~RS · SURVE'~S Rev. By Dote Description NSOP.OOOO'CEA.2YO0. O0~ Shf. 20/ ,, ~ ,, March 21, 1988 Mr. T. P. Oostermeyer Regional Drilling Engineer ARCO Alaska, Inc. P. O. Box 100360 Anchorage, Alaska 99510-0360 Telecopy: (907) 276-7542 Re: Prudhoe Bay Unit DS 4-19 ARCO Alaska, Inc. Permit No. 88-24 Sur. Loc. 916'FSL, 258'FWL, Sec. 26, TllN, R15E, UM. Btmhole Loc. 916'FSL, 258'FWL, Sec. 26, TllN, R15E, UM. Dear Mr. Oostermeyer: Enclosed is the approved application for permit to drill the above referenced well. The permit to drill does not indemnify you from the probable need to obtain additional permits required by law from other governmental agencies prior to commencing operations at the well site. To aid us in scheduling field work, please notify this office 24 hours prior to commencing installation of the blowout prevention equipment so that a representative of the Commission may be present to witness testing of the equipment before the surface casing shoe is drilled. Where a diverter system is required, please also notify this office 24 hours prior to commencing equipment installation so that the Commission may witness testing before drilling below the shoe of the conductor pipe. ~~y~rs, ~ C. V. Chat:terton Chairman of Alaska Oil and Gas Conservation Commission BY ORDER OF THE COMMISSION dlf Enclosure cc: Department of Fish & Game, Habitat Section w/o enc!. Department of Environmental Conservation w/o encl. STATE OF ALASKA ~-' ALASK/-, .)IL AND GAS CONSERVATION C_,MMISSION PERMIT TO DRILL 20 AAC 25.005 ?r~luccd WoW ~l'~¢z~so~l la. Type of work Drill ~ Redril, ~1 lb. Type of well. Exploratory [] Stratigraphic Test [] Development O,, [] Re-Entry [] Deepen~, Service'~ Developement Gas [] Single Zone E~ Multiple Zone I~ 2. Name of Operator 5. Datum Elevation (DF or KB) 10. Field and Pool ARCO Alaska, Inc. RKB 60', PAD 21'GLfeet Prudhoe Bay Field 3. Address 6. Property Designation Prudhoe Bay Oil Pool P.O. Box 100360, Anchorage, AK 99510-0360 ADL 28324 ALK 2322 4. Location of well at surface 7. Unit or property Name 11. Type Bond (see 20 AAC 25.025) 916'FSL, 258'FWL,Sec.26,T11N,R15E,UM Prudhoe Bay Unit Statewide . At top of productive interval "~ 8. Well nu .mber Number 916'FSL, 258, FWL,Sec. 26,T11N,R15E,UM DS 4-19 #8088-26-27 At total depth 9. Approximate spud date Amount 916'FSL, 258' FWL,Sec.26,T11N,R15E,UM 03/21/88 $500,000 12. Distance to nearest 1D3S D~+s_t~ce2~bo, n~arest well 14. Number of acres in property 15.7P0r(~9~l%d depth (MD and TVD) property line 258' ~ TD feet 2100'ND/TVD feet 2560 7000'TVD feet 16. To be completed for deviated wells 1,3J,~ 17. Anticipated pressure (see 20 AAC 25.035 (e)(2)) Kickoff depth feet Maximum hole angle 0 Maximum surface 2390 psig At total depth (TVD) 3090 psig 18. Casing program Setting Depth size Specifications Top Bottom Quantity of cement Hole Casing Weight Grade Coupling Length MD TVD MD TVD (include stage data) 30" 20" 91.5# H-40 Weld 80' 30' 30' 110 110' 2000# Poleset 17-1/2'! 13-3/8' 68# K-55 BTC 20' 30' 30' 50 50' 2500 sx CS Ill & 17-1/2'~ 13-3/8' 72# L-80 BTC 2950' 50' 50' 3000 3000' 500 sx CS II 12-1/4r 9-5/8' 47# L-80 BTC-Mod 4470' 30' 30' 4500 4500' 1060 sx Class G 12-1/4' 9-5/8' 47# L-80 BTC 2500' 4500' 4500' 7000 7000' 19. To be completed for Redrill, Re-entry, and Deepen Operations. Present well condition summary Total depth: measured feet Plugs (measured) true vertical feet Effective depth: measured feet Junk (measured) true vertical feet Casing Length Size Cemented Measured depth True Vertical depth Structural Conductor Surface RECEIVED Intermediate Production ..... :' ~' Liner Perforation depth: measured AI~ ell & Gas CODs. GOIIi~JssJ0,~ true vertical 20 Attachments Fi ~gfee · ~ Property plat [] BOP Sketch~. Diverter SketCh~ Drilling program Drilling fluid program~Time vs, depth plot [] Refraction analys~s [] Seabed report [] 20 AAC 25.050 requirements~-,, 21. I hereby certify that the/.f~ore~i~.g..js true¢~ and correct to the best of my knowledge//~y.~ Date ' ..~) Title Regional Drilling Engineer Signed , , "' / Commission Use Only (MDD) PD2/77 Permit Number I APInumber lAppr°valdate ISeec°verletter ~ ~.,--~// 50--C~2_Z9 - '~i 'T~)/ 0_~/2'1 /~ for other requirements Conditions of approval Samples required [] Yes J;~ No Mud Icg requ'ired [] Yes ~ No Hydrogen sulfide measures [] Yes ~ No Directional survey required [] Yes ~[ No Required working pres~.~u~e for BOP,~"~2~; ID, 3M;~ .~, 5M; [] 10M; [] 15M Other: f/~/"~~~~.a.~rltCty TO,, by order of Approved by ( ~ ~' L ~..~'.~--~.~~ Commissioner the commission D at Form 10-401 Rev. 12-1-85 , / PBU DS 4-19 OPERATIONS SUMMARY 1) MIRU drilling rig. 2) Spud well and drill 17-1/2" hole to 3000'MD/TVD. 3) Set 13-3/8" casing and cement same. Test casing to 2500 psi. 4) Drill 12-1/4" hole TD at 7000'MD/TVD. 5) Run wireline logs as programmed. 6) Set 9-5/8" casing and cement same. Bump plug with brine. Test casing to 3000 psi. 7) Freeze protect and release rig. 8) Run cement evaluation logs. Gyro is not necessary. 9) MIRU completion rig. Run 7" tubing to 3300'. Nipple up 7" tree. Release rig. 10) Rig wireline and perforate. RECEIVED MAR 1 4 Alaska. Oil & Gas Cons. Commissiorl Anchorage PD2/77b 3/11/88 NOTE: a) In accordance with Area Injection Order No. 4, excess non-hazardous fluids developed from well operations and as necessary to control fluid level in reserve pit will be disposed of down the 9-5/8" x 13-3/8" annulus. The annulus will be left with a non-freezing fluid during any extended interruption in the disposal process. The annulus will be sealed with 300 sx of cement followed by Arctic pack upon the comple- tion of the fluid disposal process. b) Wells within 200' of the proposed well are: DS 4-24 26' @ 2500'MD/TVD DS 4-18 21' @ 2100'MD/TVD DS 4-16 176' @ 2000'MD/TVD DS 4-17 103' @ 3500'MD/TVD c) The drilling fluid program and fluid surface system will conform to the regulations set forth in 20AAC25.033. d) Maximum surface pressure is based upon BHP and a full column gas to TD (0.10 psi/ft). e) This well is being drilled for produced water disposal. At a later date (+1991), it is planned to sidetrack the well and complete as a producer. PD2/77b 3/11/88 RE£E VED MAR 1 Alask~,Oi~ & Gas Cons, Commissior', ~chorage o -4000 0 U~ L~ [-~ Zo Z 0 E - I,,i COOROINRTES -3000 -2000 - 1000 0 1000 2000 5000 -4000 -3000 -2000 - 1000 0 ! 000 2000 30CC E - IN COORDINFtTES o -~000 o o 0 Z 0 o £ - N COOROINF~T£S -3000 -2000 - 1000 0 ! 000 2000 C) 0 3000 Z. - ..... 18 ~i1591 ............. ' ' ' ' ' ' ................. 0~,~0,~ -2~~ ?~~69E 8~ ............... ' ' °o Ts sss x,.,,~932 ': 6: j3,~c. 8 ii i ,, . ~ '~". II II I -4000 -3000 -~-000 - 1000 0 ! 000 ;2000 3000 ~810 ~6 F. - W RnQRnTNRTF$ E - W COOROINA'rES r,1 cz) I I -3OO -200 -100 0 100 ~dO 300 400 , 4006 3748 3380 ..... t3480 I i * i i , ~ i i i i i -300 -200 -100 0 100 200 300 ~00 098 ;2 E - WI COOROINBTES Depth (TVD) Density #/gal Plas Yield Visc. Point (CP) #/100 ft2 Surf 8.8 Funnel to to 100- 13-3/8" 9.2 250 Csg Point 13-3/8" Csg Shoe to TD 9-5/8" Csg Point DS 4-19 MUD PROGRAM Initial Gel 40-60 30+ 8.8 10 2 2 to to to to 9.4 20 4 4 1OM FL % % pH and Gel CC/30M Oil Solids Type of Mud Gel-Benex 50+ 25 0 8 Spud Mud 5 25 3.5 Low solids/ to to 0 to non-dispersed 10 10 6.5 EQUIPMENT - DRILLING FLUID SYSTEM 1. Degasser 2. Shakers 3. Pit level indicator (with both visual and audio warning devices) 4. Drilling fluid flow sensor (with readout convenient to the driller's console) 5. Trip tank 6. Agitators 7. Mud cleaner and centrifuges PD2/77a Aia.~k~ Oil, & 825 C0~S. TYPICAL MUD PIT SCHEMATIC BBLS BBLS TRIP TANKS i i i ii ii iiiii ISHAKER DEGASSER (83 BBLS) DESILTER (97 BBLS) PILL PIT (36 BALE) OESANDER !' (97 BBLS) (36 BBLS) SUCTION PIT (448 BBLS) MIX PIT (122 BBLS) DRAWING IS NOT TO SCALE NOTE: SYSTEM IS EQUIPPED WITH A DRILLING FLUID PIT LEVEL INDICATOR WITH BOTH VISUAL AND AUDIO WARNING DEVICES AND A FLUID FLOW SENSOR LOCATED IN THE IMMEDIATE AREA OF THE DRILLER'S CONSOLE. JG 7/24,'87 SURFACE HOLE DIVERTER SYSTEM SCHEMAllC ARCO ALASKA, INC. FILL-UP LINE RISER FLOWLINE 20" 2000 DIVERTER 10" BALL VALVE .. 10" BALL VALVE ,. CONDUCTOR NOTE: ONLY ONE VALVE OPENS AUTOMATICALLY WHEN THE DIVERTER CLOSES. THE SECOND VALVE WILL REMAIN CLOSED UNLESS CONDITIONS REQUIRE THE USE OF THE SECOND VENT LINE. THE SECOND VENT LINE VALVE CAN BE OPENED USING CONTROLS LOCATED AT THE ACCUMULATOR. THIS IS A VARIANCE FROM 20AAC2S.O~ 10" VENT LINES WELL , I ! , RIG MODULES I NOTE: 100' FROM ANY IGNITION SOURCE ALL TURNS 90 DEGREE TARGET TEE~ ~mmm m m m mm mm em mm m mm mm m mm mm m m m mm mm em, mm mmm m mm mm m m m m m mm mmmm mm mm m mm ,mm m mm mm m mmm mm RESERVE PIT JQ 7/27/87 13-5/8' 5000 psi BOP ..STACk DIAGRAI'I ACCUrqULATOR CAPACITY TEST ANNULAR PREVENTER PIPE RAI~ BLIND IMm DRILLINg SPOOL · . PIPE RAI~ DRLG SPOOL CSG SPOOL ALL BOP EQUIPHENT 5000 PSI RATED 1. CHECK AND FILL ACCUr'IULATOR RESERVOIR TO PROPER LEVEL WITH HYDRAULIC FLUID. 2. ASSURE THAT ACCUMULATOR PRESSURE IS 3000 PSI WITH 1500 PSI DOWNSTREAM OF THE REGULATOR. 3. OBSERVE TIHE, THEN CLOSE ALL UNITS SIMULTANEOUSLY AND RECORD THE TII'IE AND PRESSURE REI'L~INING AFTER ALL UNITS ARE CLOSED WITH CHARGING PUMP OFF. 4. RECORD ON IADC REPORT. THE ACCEPTABLE LOWER LIMIT IS 45 SECONDS CLOSING TIME AND 1200 PSI REMAINING PRESSURE. 13-5/8' BOP STACK TEST I. FILL BOP STACK AND HANIFOLD WITHA NON-FREEZING LIQUID. 2. CHECK THAT ALL HOLD DOWN SCREY~ ARE FULLY RETRACTED. I~BiRK RUNNING ,JOINT WITH PREDETERIktlNED PLUG SEATING DEPTH. RUN TEST PLUG ON DRILL PIPE AND SEAT IN WELLHEAD. RUN IN LOCK DOWN SCREVf~. 3. CLOSE ANNULAR PREVENTER AND UPgTREM't VALVES. 4. FUNCTIONALLY TEST CHOKES. 5. IN EACH OF THE FOLLOWING TESTS, FIRST HOLD k 2:50 PSI LOW PRESSURE TEST FOR A MINIMUM OF :3 MINUTES, THEN TEST AT .~ THE HIGH PRESSURE. · IHC:REASE PRESSURE TO 3000 PSI AND HOLD FOR & I~IIN'iHUM , , . 10. 11. 12. 13. 15. 16. 17. 18. OF 3 MINUTES. BLEED PRESSURE TO ZERO. OPEN ANNULAR PREVENTER AND CLOSE TOP SET OF PIPE RAHS. INCREASE PRESSURE TO SO00 I~1 AND HOLD FOR AT LEAST 3 MI NUTES. BLEED PRESSURE TO ZERO. CLOSE VALVES OI RECTLY UPSTREAM OF CHOKES AND OPEN CHOKES. INCREASE PRESSURE TO SO00 PSI AND HOLD FOR AT LEAST $ MINUTES. BLEED PRESSURE TO ZERO. OPEN TOP SET OF PIPE RAHS THEN CLOSE BOTTOM SET OF PIPE RAHS. INCREASE PRESSURE TO SO00 PSI BELOW THE BOTTOPI SET OF PIPE RAHS AND HOLD FOR AT LEAST 3 PIINUTE$ TEST REPIAINING UNTESTED MANIFOLD VALVES (IF ANY) WITH SO00 PSI UPSTREAI'I OF VALVE AND ZERO PRESSURE DOWN- STREAM. BLEED PRESSURE .TO ZERO. OPEN BOTTOM SET OF PIPE' RAHS. BACK OFF RUNNING ,JOINT AND PULL OUT OF HOLE. CLOSE BLIND RAMS ANO TEST TO SOO0 PSI FOR AT LEAST $ MINUTES. BLEED PRESSURE OFF ALL EQUIPMENT. OPEN BLIND RAMS. HAKE SURE I'IANIFOLD ANDLINES ARE FULL OF NON-FREEZING LIQUID AND ALL VALVES ARE SET IN DRILLING POSITION. TEST STANDPI'PE VALVES TO 5000 PSI. TEST KELLY COCKS AND INSIDE BOP TO SO00 PSI. CHECK OPERATION OF DEGASSER. RECORD TEST I NFORHATION ON BLOWOUT PREVENTER TEST FORI'I. SIGN AND SEND TO DRILLING SUPERVISOR. PERFORI'I COHPLETE BOPE TEST ONCE A WEEK AND FUNC- TIONALLY OPERATE BOPE DAILY. JG 8- 26- CHECK LIST FOR NEW WELL PERMITS Company /~/~~ Lease & Well No. ITEM APPROVE DATE YES NO (1) Fee ~,P~t~u -g/[SJScS 1. Is the permit fee attached .......................................... ~ REMARKS (2 thru 8) (8) (3) Admin ~,~, e/£8/4 O. (9 thru 13) 10. (10 ~ 13) 12. 13. (4) Cas~ (14 thru 22) ( 5 ) B 0 P E ~. ~_~ .~-)J¢-~ (23 thru 28) (6) OTHER ~~ ~/~/g~c (29 thru 31) (6) Add: Geology: Engineer ing: LCS BEW rev: 02/17/88 6.011 2. Is well to be located in a defined pool ......................... ' .... ~ 3. Is well located proper distance from property line .................. .~ 4. Is well located proper distance from other wells .................... ~f~ 5. Is sufficient undedicated acreage available in this pool ............ ~ 6. Is well to be deviated and is wellbore plat included ................ ~ 7. Is operator the only affected party ................................. ~ 8. Can permit be approved before fifteen-day wait ...................... .~ Does operator have a bond in force .................................. ¢ Is a conservation order needed ...................................... Is administrative approval needed ................................... Is the lease number appropriate ..................................... ~ Does the well have a unique name and number ......................... ~ 14. 15. 16. 17. 18. 19. 20. 21. 22. Is conductor string provided ........................................ Will surface casing protect fresh water zones ....................... Is enough cement used to circulate on conductor and surface ......... Will cement tie in surface and intermediate or production strings ... Will cement cover all known productive horizons ..................... Will all casing give adequate safety in collapse, tension and burst.. Is this well to be kicked off from an existing wellbore ............. Is old wellbore abandonment procedure included on 10-403 ............ Is adequate wellbore separation proposed ............................ 23. 24. 25. 26. 27. 28. Is a diverter system required ....................................... Is the drilling fluid program schematic and list of equipment adequate~ Are necessary diagrams and descriptions of diverter and BOPE attached. Does BOPE have sufficient pressure rating - Test to ~¢~ psig .. Does the choke manifold comply w/API RP-53 (May 84) .................. Is the presence of H2S gas probable ................................. For exploratory and Stratigraphic wells: 29. Are data presented on potential overpressure zones? ................. 30 Are seismic analysis data presented on shallow gas zones ......... 31 If an offshore loc., are survey results of seabed conditions presented o ~o 32. Additional requirements ............................................. ,~ , / / INITIAL GEO. UNIT ON/OFF POOL CLASS STATUS AREA NO. SHORE Well History File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history, file. To improve the readability of the Well History file and to simplify finding information, information of this nature is accumulated at the end of the file under APPENDIX. , No special effort has been made to chronologically organize this category of information. ALASKA CO~UTING CENTER ****************************** *------- SCHLUqOERGER ******************************* COMPANY NA~E : ~RC[i ALASKA,, INC, W~L 'i%'A~E : iD,S, 4- lg ~fEbD MA [{~ : PRUDHC~E BAY sraTE : ALASKA APl NU~BER : 50-0~9-21,791-00 REFERENCE NO : 95210 ,IS Tape Yeriflcstion bistJnq .chlumher~er Al. asKa Co.~:~,ltJna Cepter 26-JUN-1995 !6:34 ALASKA I~.~C, DS 4-19, P~U[)NOE BaY, 50-029-2179~-00 O,S. g ' 19 500292179100 arco a[,,~s~, ]liNC, $CHLU~!iBERGER .~EbL SERVICES 26-J[Js-95 9521~ J, JULIAN 26 255 6O 00 s~:oo 21,00 SIT SIZE fiN) SIZE (.IN) DEPTH (FT) WEIGMT (LB/FT) ....... . ........ .. ..... ~.---------~..-:~ ..... .... !ST ST~IHG 9.625() ? ~',~ p S~l, R i ~ (; 7,000 2993,0 26 3RD STRI~G 5,500 3110.0 17'00 CI!RVE SHIFT DATA - ,a.;!~L PaSS~:S ]:.'0 SY~taDA~t)(aEASURED DfiPTH) PAGE: IS q'ar, e verifY, cation LiStind Chlt.l,~ber.:~er AlasKa Computinq Center .......... E(~UIVA 5606.0 5587.5 558~.5 5573,5 557~ .5 5567.5 5566,0 5545.5 5545,0 5519,5 551t.0 551 ~ .0 5~6~.5 5470.5 546 ], 5 5463.5 5456.5 5457,5 453.0 5453,5 4'46,0 54()~. 0 5408.5 5393,0 53 ~.~ 'I..o 5373.0 5,]75.0 535~: S 5357.5 5342. O 5343.5 5332,0 5333,0 5~23.5 5325.0 5314.5 5~98.0 5~9~. 0 5272.~ 5272.5 5246, ~; 5~3~. n 5238, ,. 5223.5 5209.5 5209.5 5~79,5 5180.5 5155.5 5155.0 5~56.0 51.32 5 5t20: 5 5! 2i. 0 5~04,0 507S, 5 5~)79.0 507~.0 5069,0 5069,0 506~.0 5035.5 SIG~ ;;---:- eec 5 5606°5 5588.0 5584.0 557~ .5 .0 5522 5501 5477 5445.5 5408.0 5394,5 5382,0 5358.0 5316.5 527~.5 5247,5 5224,5 5210.o 5156.0 5133.0 5104.5 5079.0 5068.5 5035.5 26-JUN-1995 U~SHIFTED 16:34 DEPTt4 .......... PAGE: Tape verlff, cation [.istlnO .Chlumberger AlasKa Comptltinq Center 5019.0 5010.5 499F{. 5 499! .0 4990,0 4079 K 4944,5 943 0 4907,0 4~89.5 4R67,0 4846,5 4~31.0 ~05.5 47~9.0 47~1.0 ~775~5 4756,5 4718.5 4717,0 4703.0 4702.5 46S! .0 467S.0 4634 ~ 4.~56 0 45~ ~ 0 4536,5 4524,0 4523.5 4521,0 45O5,0 ~ 4 ~ 4.0 q: 454, 4444., 0 44.!4,0 435~,5 4~06,5 ~ 3 () 3, n 4~47 , 4216,Q 4213,9 4~.96,3 4193,5 419!,0 501 I .0 4991.5 495n . 5 494~.5 4926,0 40o3.5 ,ta90.5 4828.5 4804.5 4789.5 4757.5 471~.0 4704,0 4682,0 4635,0 4549,0 ~536.0 4524,5 4504.5 4484,5 4454,0 4~15,0 4356,0 4333'0 .4.306.5 4262.5 4751.5 4216,5 419~,0 5021.5 4999.5 4991.0 ~981.,0 4945,0 4926,0 4~90.5 4868.0 4848,0 4781,0 4776.0 4734,5 4720.5 4704,0 467~,0 4635.0 ~557,0 4524,0 4520.5 4454.0 4441.0 4380.0 4307,5 4216.5 4194,0 26-jUN-1995 16:34 PAGE: .I$ maoe verl.~Icatlon ichlumberger Alaska Computing Center 4180.5 4159,0 a143,~ 41.45,K 4!37,5 413~,0 4137,0 4132.0 4132.5 ~21,0 4!10o5 4079,0 4056,5 4053,5 4057.0 4043,5 4044.5 4033,5 4014.5 4~16.0 3~98,0 3980.0 3983,0 3a6~.5 3~67.n 3957.0 3061,5 ~37 5 3940.0 3913,0 3~14,5 391.2,5 3874,0 3a74,5 385a n 3a52,5 3839,0 3~15'5 3a13,5 807,5 3738.0 373a,0 373e"n 3719,~ 3719,5 3710,5 3712,5 3695,n 3690,~ 3693.5 3677.0 365S.0 3630.5 3633,5 3610,0 361 ~. 0 359~.5 ~570.5 3573.0 ~549,5 3535.0 351a,5 3522.0 3501,0 3504.,0 3495,5 34,73,0 3474.5 3463.0 3462.5 3446,5 3445,0 3445,0 3436,0 34,39,5 343~,0 3413,5 4!80.5 4159.5 4149.5 4139,0 4!22.0 4!i0,5 4057.0 4033,0 3960.0 392~.0 3912,0 3840.0 3808,5 3762,5 373S.0 3693,5 3677,5 ~660,0 3595°5 3549,0 3534.5 3495,5 3469,0 3446,0 3434,0 3414,0 26-jU~-~.995 16:34 PAGE: ,IS Tane Yerificat!o,~ f, tstlno ;cblUmberger AlasKa Compdtir~q Center 339c~,0 3400,5 330r;. 0 3395.5 339].5 3392.5 33~° 5 3389 5 3375.5 3375.5 336~.5 336~ .5 3345.0 334~.0 333~ .0 332R.~ 3313.5 3313,0 33t3.0 3313,C 3301.0 3300,5 3264.0 3263.0 3~37.0 3237.0 3226.~ 322~.5 32t2.5 3~97.5 31,97.5 3!79.0 3~7~.5 3i7~.5 3178.5 317~.0 3t5~.0 3J53.0 3~ 5<~,{'~ 31 50.0 3126.0 3t 25.0 3I~9.5 3!19.0 3103,0 310~. 0 3~ o2.0 3102.0 ~O0.~ 99,0 100,0 26-JUN-1995 t6:3~ :]:he depth adjustments shown above reflect cased hole to open hole GR and. cased, hole SIGI¢ to ope~ hole GR Al. 1 other TD"i~P curves ~ere carried wlt~ the SIGN sh{fts. $ S PAGE~ FTL~ NA~4~;, : EDIT ,OO1 SERVICE VFR g I 0~'~,~ : O01COi FILE TYPE b~ST FILE Depth shifted and 0.5000 for each pass in separate fi. les, ,IS 'rape veritlcation I, isttno ~chlt]mberqer AlasKa ¢,.,Jmputin~ Center 26-JU~i-1995 16:34 PAGEI CRCi~ 559,). 0 3100.0 ...... oo17.0 3100.0 CI~RVR $}{IWT DAT~ - P/%SS TO PASS(:4EASt,iR~D DEPTN) nAggl.,i~g CURV~ FOR 8~IFi'S .......... EaUiVALENT UNS~..!IFTED I')EPT~--- ....... GRCH oE~,'~,aRKa: This file contains TDTP Pass #i. ~io pass to pass shif%s were applied %o this data. $ LIS FOl%iqkT ~ATA ** DATA FORMAT SPMC!FICATI~M RECORD ** 3 73 92 4 aa 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 1~ 66 11 1,2 68 13 66 0 14 65 FT 15 66 68 16 66 0 66 0 ** ~EP TYPE C~AN ** ....NA~ ; ...... SWRV'''')JN ....... l'~' 8ERV ;"'''';'"~: ......... C A 1 aPI A ! FILE 5~U~IB NUMB SIZE R ESS "l" ' ~ ~ T ..... ID ~.,~:,D.~R # LO~, YPE ChASS ~00 ~U~F 8A~P EbEM CODE (HEX) ...... ........ , ....... . ........... ..... ......... DMPT FT 501044 ()0 000 O0 0 I I 1 4 68 0000000000 SIG~,: TDTP C!I 501044 O0 000 O0 0 i I ! 4 68 0000000000 t.. HI TDTP P[)-S 5<.~1044 ()0 (.,00 O0 0 I I 1 4 68 0000000000 ~IS Ta~e ~'eriflcatlon Listino ~chlum~erger AlasKa Co~putinq Center 26-JUN-1995 16:34 PAGE= APl API APl API FILE [i~g M Z R E bOG ']PY?F.., CLASS ~.iOD NUMB SA,~.~F ELE~4 CODE (HEX) Hw ,i':,~P U ~1~)4'4 O0 <:DO oO <3 i 1 I 4 68 000000 SBH~ TDTP CU 50~044 O0 CO0' O0 0 I 1 ! 4 68 0000000000 SIGC Ti~TP Ct] 5~1044 O0 0o0 O0 O I 1 I 4 68 0000000000 SI5~ 'rDTP CI] 501 ~)44 00 000 00 0 I 1 i 4 68 0000000000 TRA~ TDTP 5ul. 044 00 030 00 0 1 1 1 4 68 0000000000 LC0! TbT~ CU 501044 00 OJ0 00 0 1 1 1 4 68 0000000000 SDSt Ti)TP CPS 501044 00 00O O0 0 1 I 1 4 68 0000000000 BACk T,>TP CPS 5(~1044 O0 000 O0 0 I 1 1 4 68 0000000000 F~Ac T [)T [~ CPS 5 u I ,',) ,'% 4 00 o00 O0 0 I 1 1 4 68 0000000000 TCA~ T[)TP CPS 501044 O0 00,') O0 0 ~ 1 1 4 68 0000000000 TCAF' TDTP CPS 50~044 O0 000 O0 t) 1 I 1 4 68 0000000000 TCND TDTP CPS 50!. t)44 ()0 00o 00 u 1 1 1 4 68 O00oO00000 TCFD TDTP CPS 50~,044 00 000 00 0 I 1 l 4 68 0000000000 T $ C~,'{ TDTP CPS 501044 00 000 00 0 ! 1 1 4 68 0000000000 TSCW TDTP C~S 5o1044 O0 000 O0 0 i 1 I 4 68 0000000000 I ~J ~.~ P TDTP CPS 5t~I044 00 000 ()0 0 1 I 1 4 68 0000000000 INF~ T[>TP GAPI 501044 00 O00 O0 0 I I 1 4 68 0000000000 G~C{~ TDTP LB 501044 00 000 00 0 I 1 I 4 68 0000000000 T~S TDTP V 501044 O0 000 O0 0 1 1 1 4 68 0000000000 CCL T D'[{J P GAPI 5~)1 ()44 O0 000 O0 0 1 1 1. 4 68 0000000000 t)~P~' 56~. (>. 00(,; S '[Gfq.TDT~ -990.250 TPHI.TDTP -999.250 SBHF.TDTP S~.H~ ~TDTP -999.250 StGC.TDTP -999.~50 SIBH.TDTP -999.250 TRAT.TDTP LCO1.'I"'~',~.,"~.P -99%~. 25[) ${)SI.?.,~TDTP,~ -999. 250 ~ACK.TDTP ~99~.99~"'250 FBAC.TDTP TCAN · T{")TP -999.250 TCAF..l{,)I~ -999 ~50 TCND. TDTP 250 TCFD, TDTP TSC~.TDT'P -99~ "~5' ' 2 9~ TDTP .z 0 'TSCF ~.,.,,..)~.m -990 250 INND.TDTP 9 250 INFD. . ..... ~ TENS, IO/P -999 250 k, CL. D P 58 LCO 1 [ Ti>TPSB N ~,~ T D','.' ~? 54.9713 S IGC' TD'~fP 5.306 SI BH ',,TDy p 57 28 TRAT. TDTP 67 SDSI'T'D:['P 162.065 .BACK. DTD 23 470 FBAC.TDTP I'967 TCAF.TD%'P 13746 459 TCND TDTP 3196~~720 TCFD'TDTP TCA~,~ .'r:)TP 4514. . , .. TSC~ TDTP 548 51,) T~cF.~I.,[P 1255 653 INND.TDTP 278;750 INFD.TDTP G~C}'~. TDTP 485.000 TENS.TDTP O.OOO CCL.'fDTP 35.:345 ~999,250 999 '250 '999'250 ' 999,250 42,833 1,899 54,348 52 ,' 827 1 ** EN[) OF DATA ** WaDe Veri~icar~ion Listlnq ',chlumberqer AlasKa Co.~pt]tinq Center 26-JUN-1995 16:34 PAGEI VERSI~]~ : 00!C01 DAI'V MAX REC STZE : 1094 F'TLF TYPE : [,,~ 8~ PILE FTI.,;i ,",~A,~:'~E : EDIT ,002 SERVICFL : FLTC VFRSIOa : DATF : g5/06/26 ~X REC SIZE : 1024 FIbF~ TYPE : L,~ST FILE : FIL~ HEADER EDITED CURVES Dentn shifted and clipoed c~1rves ~or each DEP'rH I'NCRE~IENT: 0.50()0 I,Dt~G TOOL CODE START DEPTH STOP DEPTH ............. ..... ....... . .... ..... GRCH 5586.0 5498.0 SI(;~ 56 i 3. O 5498,0 CURVE SHI'T D~. A - :,AS~ TO P,~S~(~'~EASURED Off, ' F ',I; P ...... '""p ' D, AS~;[,i?,]E CURV~ FOR SHIFTS bDWG CURVE CODE: P:~SS ~U~4bER: I ~ASELI~E DEPTH 5604 $ 5592 5 55~8 5 5584 5 5580.5 5576.5 5572.5 5564 5 556o' s 5556~5 ----~TOLtlVIbENT UNSHIFTED DEPTH---------- SIG~ 5604 5 5593 0 5588 5 5585.5 558~.0 5577.0 5572.5 ' 5564.5 5562.0 5558.5 ,IS Ta~e Yerifi. catiom bistln.~ ,chlUm~erqer AlasKa Computing Center 26-JUN-].g95 16:]4 5552.5 5552,o 5555,0 554~.5 5549,5 5544.,5 5546.0 100,o 90,5 !01.5 $ PE~A~S: THIS FILE COi,~TAINS 80~ PASS ~! OF THE ~D~P. THE DEPTH CORREC'£IdNS SaOWi~ ABOVE REFLECT BORAX PASS #1 GRCH TO .~ SIG~. ALL OTHER TDTP CURVES WERE CARRIED ~ITH THE SIG~ SHIFTS, LIS Fo~AT DATA PAGE: 9 ** Dh'YA FORMAT SPECIFICATIOM RECO~D ** TYPE REPR COD~ VALUE 1 66 0 2 66 0 4 66 5 66 6 73 7 65 8 68 0 5 9 65 1,t 66 13 66 0 4 65 FT 15 66 68 i6 66 0 66 DFPT FT 50!.044 O0 000 O0 0 2 1 1 4 68 $ I G~'- TDTP CU 501044 O0 O00 O0 0 2 I 1 4 68 TPHI TDTP PI,I-S 50104:4 O0 000 O0 O 2 1 1 4 68 SBHF TDTP CU 50 ~.()44 O0 000 O0 0 2 I 1 4 68 $BHM TOTP C[J 501044 O0 000 O0 0 2 1 I 4 68 $IGC T[)TP CU 501044 O0 000 O0 0 ~ 1 1 4 68 81BH TDTP CIJ 5{,)~044 O0 000 O0 0 ~ I 1 4 68 T~AT TDTP 591044 O0 OOO O0 0 ~ 1 I 4 68 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 ,IS Tare verIflca%lon l, lstinq 26-JUN-1995 16:34 ;Chlumberoer AlasKa Com, putlnq Center PAGE: 10 LoG ',FYP~ CLASS ,~iOD NU~$ Sh~P F, DEM CODE (HEX) LC01 7D~cP C~.] 501~}44 O0 000 O0 0 ? 1 1 4 68 0000000000 SD$I TL~TP CPS 5u1044 O0 O00 O0 0 2 1 1 4 68 0000000000 B~C~. 'rvTP CPS 50~.~4~ 00 oo0 00 0 2 I 1 4 68 0000000000 FF~C TtJ)'r~ CPS ~(.)~.u44 o0 000 00 0 2 I 1 4 68 0000000000 TCA['~ -T~)TP CPS 50!.04~ 00 000 O0 0 2 1 1 4 68 0000000000 TeaP ~OTP CP~ 5c, 1~44 O0 uOO O0 0 2 1 1 4 68 0000000000 TC~D TDTP CPS 501944 60 000 O0 0 2 1 I 4 68 0000000000 TCFn TI, rap CPS 50! 044 00 000 00 0 2 1 I 4 68 0000000000 TSC',~ T[>TP CPS 501044 00 000 00 0 2 1, 1 4 68 0000000000 ~SCV T[)TP CPS 501044 00 000 00 0 2 1 1 4 68 0000000000 I~,',iD TDTP CPS 5o1044 0(~ 000 00 0 ~ 1 I 4 68 0000000000 I',~F~ TDTP GAPI 50! 044 O,J 000 00 0 2 ~ 1 4 68 0000000000 GPCN TDTP LB 501044 O0 000 O0 0 2 1 I 4 68 0000000000 , . ,~,~ D P 48,052 TPHI TDTP 35 584 SBHF.TDTP S~[.t~.Tr.,tLi,. i08,81.9 SIGC]TD'i:P 2~42 SIBfi. TDTP 143~798 TRAT.TDTP. LC0! 3FP 2.781 SDSI.TDTP 57~ 72 BACK.TDTP 17 083 FBAC TDTP TCA~{ TDTP t547.'701 TC~.F tD'r, 4213.299 TCND.TDTP 1150 273 TCFD.TDTP .... FDI ,~ 1134.071 INND.TDTP 356.048 INFD.TDTP TSC~,~.TDTP 63 217 TSCF.'~ 'P . 5521.000 SIGt~. TDTP -999.250 TPHI.TDTP D~TPT TOTP 999.250 SIGC,TDTP 'q99.250 $IBH.TDTP SBH~,!. ' .... LCO~ . T~";TP -999,250 SDSI,TDTP '999.250 BACK.TDTP .' . ,.. TD'rP IC&~,~, TDTP -999 250 TCA F,'I'DTP -999.250 TCND. TSC~,~, TDTP -999.250 TSCF,TDTP -999.250 INND.T [P G~C}~. TDTP -999.250 TENS,TDTP -999,250 -999 250 -999 250 -999 250 -999 250 -999 250 8BHF.TDTP TRAT.TDTP FBAC.TDTP TCFD,TDTP iNFO,TDTP 95,045 0,944 4354,557 145.649 -999.250 -999. 250 - 999,250 - 999.250 13.234 8ERVtCE : F~blC ,.. :'~ ,.. 1 ~0 i D.ATE : 95106/26 ~X REC SIZE : tO~4 FIR~ TYP~ : ,IS made verification blstino ;ChlUmberqer AlaSKa Computioq Center 26-JUN-!995 16:34 PAGB: I1 FILE F~EADER FILE NO~BER: 3 EDITED CURVES ~epth shi~ted and clipped curves for each pass in separate ~lles. P~SS NO,BMR: 3 DFP. TH I~CRE~ENT: 0.5000 FIL~ SU~AR¥ LDwG TOOL CODE START ~PTH SiG~ 5GI~,O SToP D~PTH 54 ,0 5498,0 CURVE SHIWT DATA - PASS TO PASS(M~ASURED DEPTH) RASELINE CI}RVE FOR SHIFTS LD~G CURVE CODE: GRCM ~ASE!,INE 5596,5 5592.5 558~,5 55S4,5 5580.5 5564.5 5560,5 5556.5 5552.5 554~.5 5544.5 5540.5 5fi36,5 552~,5 5524.5 552<).5 5516.5 !00,0 .......... EQUIVALENT UNSNiFTED DEPTH---------- GRC~ Sl~N 5598 5595.5 5590 5 558~,5 5563,5 5566.5 5560,0 5563.0 5556,0 5558,5 555.3.o 5555 5 555o,0 5552!0 5546.0 5547 5 5540.5 5536,0 5539.5 5532,5 5535,0 5531.5 5528,0 5524,0 55!.8,5 !()O.n 1,,02'0 ,I$ ~"ame ve~t~icatio~ Listln~ 26-JIJN-I. 995 16134 12 CORRECYIO~.~5 SHOW~ ABOVE RE~'LBCT BORAX PASS ~2 GRCH TO .1. slGa. aL~ o,raa~ TDTP C~IRVES WErE CARPIED ~ITH THE $IGu SHIFTS. $ bis FO~q'r OATA ** [JATA FO~AT SPFCIFI[CA'I'[(ON I~ECORD ** TiP~2 R~P~ CODE I 6 6 0 2 66 0 3 73 88 5 66 6 73 7 65 S 68 0,5 9 65 FT 11 66 12 68 13 66 0 14 65 F T 15 66 68 1,6 66 1 0 66 ** SET TYP~ - CHAN ** 10 ORDE~ ~ bOG TYPE CLASS ~OD NUmB SA~'P EbEM CODE (HEX) OEPT FT 501044 O0 000 O0 0 3 I i 4 68 0000000000 $1G~ 'rOT? CU 50 ], 04<4 O0 000 O0 O 3 1 I 4 68 0000000000 TPHI TDTP PU-S 501, i344 O0 000 O0 0 3 1 1 4 68 0000000000 8B~F TtJTP CU 50].04¢ OO 000 O0 0 3 1 1 4 68 0000000000 SP,[.!~;~ '~i)TP C~! 5u1044 O0 000 O0 0 3 I 1 i 68 0000000000 S!GC T[)TP Ct..~ 50!(),t4 O0 O00 O0 0 3 I 1 4 68 0000000000 SIBfl T[)T~ CU 50!044 O0 000 O0 0 3 1 1 4 68 0000000000 TPAT TOTP 501.044 00 000 00 0 3 I I 4 68 0000000000 hOOf TDTP CU 501044 O0 OOO O0 0 3 1 t 4 68 0000000000 SDSI TDTP CP$ 50~044 O0 000 O0 0 3 I 1 4 68 0000000000 BACK TDTP CPS 501044 (~0 OOO O0 0 3 1 1 4 68 0000000000 FBAC Ti)T? CPS 50~044 90 000 O0 0 3 I 1 4 68 0000000000 TCA~,~ TDTP CPS 50i 044 O0 OOO OO 0 3 I 1 4 68 OOOO000000 .IS Tape Verification Listing ~chlumbercjer AlasKa Computing Center 26-JUN-!995 16:34 PAGE~ 13 E V UN eZPV'ICE APl API APl AP1 FILE NU,'-~B NUmB R ~ U ~B SA~'!P ~5F, M CODE (HEX) ~D ORDE~" &OG TYPE CLASS MOD N ~ TC{'~ O T~,TP CPS TCF~ TL~I'P CP~ TSCN TDTP CPS T$CF m[)Tp CPs INFD . ~:).~P ~API G~CW TDIP LB 50 TENS TOTP V 5U 50] 50~ 5 0 1 50! 50 1 mmmmm..mmmmmmmmmmmmmmmmmm.#mmmmmmmmmmmmmmmmmmmmmmmmm.mmmmmmmmmm;mm 044 O0 OO(~ O0 0 3 I 1 4 68 000000000 04~ 0U 000 00 0 3 1 1 4 68 0000000000 044 O0 000 OO 0 3 1 1 4 68 0000000000 044 O0 000 O0 0 3 I 1 4 69 0000000000 044 00 000 00 0 3 1 i 4 68 0000000000 044 O0 OOU O0 0 3 1 1 4 68 0000000000 044 O0 000 O0 0 3 1 1 4 68 0000000000 1044 O0 000 O0 0 3 1 1 4 68 0000000000 1U44 O0 000 O0 0 3 I 1 4 68 0000000000 mm.mmmmmmmm.mmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmm ** DATa ** DEPT. 5615. SBHN.7'Di~P 107. LC0~.TDTP 6. ICAN.Ti)T~ 453. T$C~.TDT~ 90, G~C~.TO'r~ 6~0. DEPT. 549A. SBHN.TDT¢ -999. LCO1.TDT9 -999. TCA~'!.TDTP -~99. TSCM.TDT? -999. GPC~,TDTP '999, IDTP 3.305 BBHF.TDTP 000 SIGM.TD~P 24.784 TPHI." · !OS SIGC.TDTP 0.000 SIBH.TDTP 124.656 TRAT.TDTP 847 SOSI.TDTP 79.720 BACK.TDTP 32,554 FBAC.TDTP . .' ~ p 352 TCAF TDTP 4239 869 TCND ~Dr.. 1213.053 TCFD.TDTP 48~ TSCF.TDTP 10901427 INNO.T~TD 362.490 IMFO.TDTP 000 TENS.TDTP 0.000 On<i S :IG~. TD'TP -999.250 TPHI.TDTP 999 250 SBHF.TDTP 250 SIGC.TDTP -999.250 SIBH.TDTP '-999~250' TRAT.TDTP 250 SOSi. TDTP -999.250 BACK,TDTP -999.250 FBAC.TDTP 250 TCAV T.?rP 999 250 TCND,TDTP -999,250 TCFD,TOTP 2.u TSCF.TDTP 999.250 INND TDTP 999.250 INFD-TDTP 250 TENS '~ .t: -999.250 97'665 0,705 652,6~5 30,260 '-999,250 :-999' 250 :.-999,250 999,250 999',, 250 15 .' 69 5 ** END .]~" DATA **** FTL~ FILM NAr~C DATE N~X REC SIZE FIL,~ TYPE bAST FIL~ TR,~ILE~ **** EDIT .003 FblC 001C0t 95/06/26 1.024 LO ,IS Ta¢e verification [.istlnq ;chlumberqer AlasKa ComPutln,~ Center 26-jUN-19q5 16:34 14 FIL~ ~fAr46 : EJDI. T 6~RvlCE : F~IC VERS I0~ : O01CO1 DaTF : 95t06/~6 ~aX ~EC SIZE : 1024 F]LF TYPE : LO LaSW FILE : F!LW HEADER FIL? NURSER: 4 ~OITEO CURVES Oeoth shifted a~]d cllpoed curves ~or esCh Pass in separate DEPTH INCREMENT: 0.5000 FILF tD~G TOOL CODE START DEPTH STOP DEPTH ...... .... .... . ........ .. .......... GRCH 5586.0 5498.0 SiGH 5613.0 5498.0 $ CURVE SHIFT DATA - PASS TO PASS(MEASURED DEPT~) BASELINE CURVE FOR SHIFTS LD~G CURVE CODE: GRCH BA~S Nlt~BE~: BASELINE DEPTH 5596.5 55~4,5 5580.5 5576 5 557~:5 556~,5 5564,5 5556.5 5552,5 554:8.5 5540,5 5536,5 553~.5 552~.5 5524'5 5520.5 5516.5 !00.0 '''''''-''EOUIVALENT UNSMiFTFD DEPTH--'---''"- GRCH SIGM 596.0 5585,5 5581.0 5577,0 5572'5 5567.5 5563.0 5527,0 5523.5 55i9.0 9~,5 5556.5 5553.0 5550 O 5542,0 5538.5 5533.5 5530,'.0 5526.0 5522.5 5~t7'5 01,0 ,.,IS TaPe verification Listino ;cDlu,;berger AlasKa ComputiaO Center 26-JL,!N-1995 16:34 PE~,~A~KS: THIS PiI,E COicTAii~.S ~ORAX PASS ~3 OF THE TDTP. THE DEPTH CO!{~EC'I'IOr,!S ,%HOW~,~ ABOVE R~FI,ECT BORAX PASS ~3 GRCM TO ~>ASE PASS ~ GRCH AN~) BORAX PASS ~3 SIGH TO BASE PASS ~1 SIG~, AbL OTHE~ !'DTP CURVES WERE C~RRI~D WITH THE SIGM S~IFT5, C S LIS KOR~.hT DATA PAGEt 15 ** o~'rA F~P~AT SP~CIF!CATION RECORD ** ** SET TYPE - 64E~ ** TYPE R~PR C[)DE Ab[l~ 1 66 0 2 66 0 3 73 8B 4 66 I 5 66 f, 73 7 65 ~) 6~ O. 5 9 65 FT 1] 66 ~1 12 6~ 13 66 0 14 6~ FT 15 66 68 1,6 66 1 0 66 1 ** SET TYPE - C~4~N ** ]~J~ RV O~,~IT SERVICE APl ~,PI AP1 AP1 ~ILE M RE PROCES~ ID O~,DER ~ bOG TYPE CLASS ~40D NUMB SA~4P EbEM CODE (HEX) 5()~ 044 O0 000 O0 50 1, 044: 00 000 00 PU-S 501.044 O0 000 00 C U 501044 00 Cu 501044 O0 Cu 50~ 044 O0 50! 044 O0 CU 50:!.044 O0 CPS 501044 O0 CPS 501044 O0 CPS 501044 O0 CPS 501044 O0 0 4 1 I 4 68 0000000000 0 4 I 1 4 68 0000000000 0 4 1 1 4 68 0000000000 000 O0 o 4 1 1 4 68 0000000000 000 O0 0 4 I 1 4 68 0000000000 000 O0 0 4 ! I 4 68 0000000000 000 O0 (> 4 1 I 4 68 0000000000 o00 O0 0 4 1 1 4 68 000000000o ¢)0o O0 0 4 i 1 4 68 :0000000000 o00 O0 0 4 1 :l 4 68 0000000000 000 O0 0 4 I 1 4 68 0000000000 000 O0 () 4 1 I 4 68 0000000000 000 00 0 4 I 1 4 68 0000000000 Tape Verl~ication l.,istin~ 26-Jt~r~-lg95 16:34 ~chlu[~berger Alaska Computino Center PAGE= 16 TD ORDEF ~ LOG TYPE CI, ASS ~OD MU~B SAMP ELEM CODE (HEX) '~'~A ..................................... TDTP CPS 50~044 O0 o00 O0 'o ........ 4 ; ...... 1' .......... 4 ~ ..... 0~''~''''00 O0 TCND TDTP CPS 50~044 O0 ()00 O0 0 4 1 1 4 68 0000000000 TCF~ TDTP CPS 501 044 O0 000 O0 0 4 ! I 4 68 0000000000 TSC~: TDTP CPS 501044 O0 000 O0 0 4 1 1 4 68 0000000000 T$CV TDTP CPS 501044 ~0 ()OO OU 0 4 1 I 4 68 0000000000 INND TbTP CPS 50~o44 O0 000 O0 o 4 ! I 4 68 0000000000 I~FD TDTP GAPI .~()~044 oo ()o0 O0 0 4 1 1 4 68 0000000000 G~CH TDTP LB 501.044 O0 OOu O0 0 4 1 1 4 68 0000000000 T~M$ TDTP V 501u44 O0 009 O0 0 4 1 I 4 68 0000000000 DEPT. 5012.50(> SIGM..TDTP 22.725 TPHI.TDTP 1 394 SBHF.TDTP SBH~,'I'DT? 1~0,t)43 S!GC,TDTP 0 000 SIBH.TDTP 126~796 TRAT TDTP LCO~ ,TDTP 6.664 SDSI,TnTP 77~788 BACK.TDTP 2~.770 FBAC:TDTP TCA~'{. TDTP 325.50U TCAF.TDTP 3964.694 TCND.TDTP 116~.561 TCFD,TDTP TSC~.,~ TDTP 62 igi ..SCf.fDfn I068 395 INNL)'TDTP 376 6~5 INFD.TDTP GRC~,TDTP 670.000 TENS.TDTP 0.000 DEPT. 5496.500 SiG,~. TDTP -999.250 TPHI.TDTP -999,250 SBHF.TDTP SBMF,,TDTP '999.250: SIGC,TDTP -999,250 SlBH,TDTP ~~999 50 TRAT.TDTP BCO1.T[)TP -999,250 SDSI,TDTP '999,250 BACK,TDTP 999~: 50 FB~C.TDTP TCA~.~ TDTP -999.250 TCND:,TDTP 2999 250 TCFD.TDTP :, .TDTP -999.250 TCAF.TDTp , TSCb: TDTP .ggo 250 TSCF -g99 250 INMD.TDTP 999.250 INFD.TDTP GRCH.TOTP -999,250 TENS.TDTP -999.250 END OF DATA 98.790 0.636 465. :128 88'868 :-999' 250 :999. 250 ::999,:250 999~250 °ooo **** FILE TRAILER **** FILE MA~E : EDIT ,004 SERVICE : FLIC [)ATF : ~AX REC SIZE : t024 FILF TYPE : LO ,I$ Tar.,e Verfftcatlon !,istlnO ;ChlU~.,erger AlasKa Computing Center 26-JUN-1995 16:34 PAGE: SErVICe; : VER$IO~ : O01CO1 DATE' : q~/OAI26 H~X R~C STZE : 1.024 FILF TYPE HEADER EPIT~:D CURVES DePth Shi~ted and clJ. pDed curves for each pass lp separate ~lles. 5 0,5000 pASS ?~LI!4BER: DEPTh !,~.:CRE~ENT .·. # FIL~i ~:D¥,G TOOl, CODE START DEPTH 5613.0 STOP DEPTH 5498.0 549~.0 CURVE SHIFT DATA - P~SS TO PASS(MEASURED DEPTH) BASELINE CURVE FOR SHIFTS LDi~G CURVE CODE: GRC~i BASELINE DEPTH 5584.5 5580.5 576 5 5556.5 5552.5 5548'5 5544.5 5540.5 5536.5 553~'5 5524 5 5520:5 5516 5 100 0 REHARK8: ----------EQUIVALENT UNSHIFTED DEPTH---------- (;RCH "'ii:; 55 .0 558~.0 5576.5 556~.0 5560.5 5556.5 5557.0 5552.0 5554.5 5550.0 5544.0 554%.0 5542.0 5535.5 5537.5 5534.0 5526.0 5522.5 5517.5 9~.~ ~0~.0 THIS PiI,,!E COi'4TAI!'!8 R. ORAX ,PASS ~.4 OF THE TDTP,: THE DEPTH CORRECT'IONS SHOWi~ ABOVE REFbEC'~7 BORAX PASS ~4 GRCH TO ~ASE PASS ~1 GRC~:i A~D B(3RAX PASS ~4 SI(;~ TD BASE PASS 'IS Ta~e Ver.if.icat.lon ,chlumberqer AlasKa Computin(..~ Center 26-JUN-1995 16:34 ~] S!C:~i, ALt, OTt~q~: TDTP CURVES WERF, CARRIED WITH THE bis FORe'AT DATA ** ~'A!~A FORe'AT SPECIFICATIOn! ~ECORD ** ** SE7 ~YPE - 64~B ** T~ RE ~ CODE YALU~ 2 66 0 4 66 5 66 6 73 7 65 ~ 68 0,5 9 65 FT 13 66 0 14 65 FT 15 66 68 t6 66 0 66 ** SET TYPE - CHAN ** NASE SFRV LJ~iI? SERVICE APl hPI AP1 AP1 FILE NUMB NUMB SIZE REPR PROCESS ID ORDEP # LOG TYPE CLASS ~OD NUmB Sa~P ELE~ CODE (HEX) DEPT FT 501044 O0 000 O0 0 5 1 I 4 6B $IGU TDTP CU 501044 O0 000 O0 0 5 i i 4 68 TPHI TDTP PU-S 501044 O0 000 O0 0 5 ! i 4 68 8B~F TDTP CU 501044 O0 OOO O0 0 5 i I 4 68 8BB~ TDTP CO 501044 O0 000 O0 0 5 1 51 4 68 STGC TDTP CU 5t)1044 O0 000 O0 fl 5 1 i 4 68 SIBH TDTP CU 501,044 O0 000 OD 0 5 1 1 4 68 TRAT Ti)TP 50104,4 O0 000 O0 0 5 1 I 4 68 5C0~ TDTP CD 5UlO44 O0 OOo O0 0 5 1 I 4 68 SDSI TDTP CPS 501044 O0 000 O0 0 5 i I 4 68 BACF' TDTP CPS 501044 O0 000 O0 0 5 ~ i 4 6~ FBAC TDTP CPS 501044 O0 000 O0 0 5 i ! 4 68 TCA~i TDTP CPS 501044 O0 000 O0 0 5 t 1 4 68 TCAF TOTP CPS 501044 O0 0()0 O0 0 5 I I 4 68 TCND TDTP CPS 501044 O0 000 O0 0 5 1 1 4 68 TCFO TDTP CPS 50~044 O0 000 O0 0 5 1 I 4 68 TSC~ TDTP CPS 501044 O0 000 O0 0 5 ! 1 4 68 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 .IS Tape %erffication l,istinq ;chlumeerger ~].asKa Computing Center 26-JU~-~995 16:~4 PA~E~ mm;m;mm~m;~mm~; .... ;; ................................................... m ....... mmmmmmm N j~ F !T S VICE API API API API FIbE NUMB NUMB SIZE REPR PROCESS TO ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) '~'~'''~''~.~ .... 44 ~'''~''~.0 ......... 0 ~ .................. ~ 1 4 ' ........68 '0000000000''''''' INN~ TDTP CP~ 50~0~4 O0 000 O0 0 5 1 1 4 68 0000000000 INFF~ TDTP GAP! 501044 ¢~0 000 O0 0 5 1 1 4 68 0000000000 GRCn TDTP DB 5U~O44 OO 000 O0 0 5 1 1 4 68 0000000000 T~NS TE)TD V 50104~ 00 090 00 0 5 1 1 4 68 0000000000 19 DEP~. 5~13.500 $£G~.TDTD 20. 204 TPHI,.TDTP 3,726 SBHF,TDTP ..~ TDTP lA7 5~4 SIGC TDT~ 0.000 SIBH,TDT~ 124,502 TRAT,TDTP 0,~ .TDTP 0,4.~4 SDSI.TDTP 96,001 BACK,TDTP 34,7i0 FBAC,TDTP DFPT 5497.000 SIG?i. TDTP '999 250 TPHI.TDTP -999 250 SBHF.TDTP SBHN TDTP '999 250 SIGC,'II.I:P 99 250 SIBH,TDTP -999 250 TRAT,TOTP LC01 ,TDTP '9~9.250 SDSI.TDTP '999.~50 BACK, TDTP -999~50 FBAC,TDTP ~ TDTP -999 250 [C~ TDTP '999,250 TCND,TDTP 999 250 TCFD,TDTP TSC~'~ . TOTP '999,250 TSCF~TDTP -999.250 INND,TDTP -999~250 INFD,TDTP GRC~. T[.)TP -999,256 TENS,TDTP '999,250 END OF DATA 97.726 O, 776 429.596 83,882 '-999,250 - 999 * :250 "999,250 '999,250 '"999.250 53'219 **** FIL~] TRAILEP **** FILF ~,~AME : EDIT ,005 S~;RV ICE : Fb]'C YER$ION : 001C01 D~TE : 95106/26 MAX REC SIZE ~ !.024 FILF~ TYP~ : LAST FILE **** FIbE ~EA. DEN **** FILE NA~E : EDIT .006 SENVICE : FbIC VERSION : 00!~C()1 ~,X REC SIZE FILF TYPE : LO hAST FILg : .I$ Tame verification Llstln~ ichlumber~er AlasKa ComPutlm~ Center 26-JUN-~9Q5 i6:34 ,2O DePth Sh~fted and cl~p~ed curves for each pass in separate files. pASs ~U~}SER: 6 F T 5 F'.. SLI~N~ RY ~..DWG TOOL CODE START DE~'rH STOP DEPT[,I SIG~; 561~, 0 5498,0 CURVE SHIFT DATA - PASS T~ PASS(;-~EASURED DEPTN) FASELI~:E CURVE FOR SHIFTS LD~G CURVE CODE, P~SS ~UMBER~ 1 ------ .... ~]OI.IIVALE:~,~T UNSHIFTED DEPTH---------- BASELINE DEP?H GRCH SIOM ~888~.0 ~8.,88 9.0 B8887,0 5596,5 5595.5 5580,5 5581.0 557~.5 5573,.0 5569.5 5569,5 5508,5 5564 ~ 5564,5 5560i 5561.5 5561.0 5556 ~ 5556.5 5557'~0 5552 5 5552.5 5554.0 5548,5 5547,5 5551.0 554,4,5 5546.5 5540,5 5539,5 5541,5 5535.0 5537.5 5536,5 5532.5 5530.5 5533,0 5529 5 5527.5 5530,0 5524:5 5523.0 5520,5 5519,5 5522,0 55!6,5 5517.5 100,0 99,0 lOl,O PE~APKS: THIS FILE CONTAINS BORAX PASS ~5 OF THE TDTP. THE DEPTH CORRECTIONS SHOWN ABOVE REFLECT BORAX PASS #5 GRCH TO ~ASg PASS #1 GRCH AND BORAX PASS #5 SIGH TO BASE PASS ~ SIGH, ALL OTHER TDTP CURVES WERE CARRIED WITH THE $IG'~ SHIFTS. $ LIS FORMAT DATA ,I$ Ta~.e verification Listl. n~ ,chlumberger AlasKa Computlno center 26-,JUN.-1995 16: 3.t PAGE: ** PATA FORMAT SPECIFICATIO~'~ RECORD TYPE REPR CODE VALUE i 66 2 66 0 4 66 1 5 66 6 7 65 8 68 0,5 1! 66 12 68 1] 66 0 t4 65 FT 15 66 68 16 66 0 66 ~mmmmmm~mm~m~mmmmmmmm~mmmmmm SIG~ TPH]' SIGC TPAT bCO~ SDST BACK FBAC TCAN TCAF TCND TCF~ TSC~ TSC~ INN~ I~F~ TMNS ** SET T'~PE - Ci~.AN ** SERV UNIT SERV~CE aPI APl A I 'I'D ORDER # LOG TYPE CLASS F T 50 ~, 044 00 00 il; 00 TDTP CU 501.044 O0 000 O0 TDTP PU-$ 50~044 O0 000 O0 TDTP CU 501044 O0 000 O0 TDTP CU 50]044 OO 000 O0 TOT? CU 501044 09 000 O0 TDTP CU 50~044 O0 OOO O0 TOTP 50~044 O0 000 O0 TDTP CU 50~ 044 O0 OOO O0 TDTP CPS 501:044 O0 000 O0 TDTP CPS 50! 044 O0 000 TDTP CPS 50~ 044 oO 000 O0 Tt)TP CPS 501044 O0 000 TDTP CPS 501[}44 O0 000 O0 TOTP CPS 501044 O0 000 O0 Ti,~TP CPS 501944 ©0 000 O0 TDTP CPS 501044 O0 000 O0 TDTP CPS 501044 OO 000 O0 TDTP CPS 501044 O0 OOO O0 TDTP GaPI 501044 OO 000 O0 TI)TP bE 50~,0,44 O0 000 O0 TDTP V 501044 O0 000 O0 ~'~'~ E .... N ~''''~MB . .... gB '~[~S REPR''''''''''''''''PROCESS NUMB SA~P ELE~ CODE (HEX) 6 1 B 0000 000 0 6 I 1 4 68 0000000000 0 6 I 1 4 68 0000000000 0 6 I 1 4 68 0000000000 0 6 1 I 4 68 0000000000 0 6 I ! 4 68 0000000000 0 6 1 I 4 68 0000000000 0 6 I 1 4 68 0000000000 0 6 1 1 4 68 0000000000 0 6 1 I 4 68 0000000000 0 6 1 i 4 68 0000000000 0 6 I 1 4 68 0000000000 0 6 i I 4 68 0000000000 0 6 1 1 4 68 0000000000 0 6 1 1 4 68 0000000000 0 6 1 I 4 68 0000000000 0 6 I I 4 68 0000000000 0 6 i I 4 68 0000000000 0 6 1 i 4 68 0000000000 0 6 1 I 4 68 0000000000 0 6 1 I 4 68 0000000000 0 6 1 I 4 68 0000000000 21 ~I$ Ta~e Verification Listlno icblumberger Alaska ¢?om~ut!nq Center 26-0UN-1995 16~34 4.237 SBHF.TDTP 124.223 TRAT.TDTP 32.358 FBAC.TDTP 1004.493 TCFD.TDTP 360.285 INFD.TDTP PAGE:: 22 95,490 0.782 445,949 84.403 -999.250 **** FILE TRAILER **** FIL~: NA~E : EDIT .006 SERVICE : FBIC VERSION : O01CO1 DAT~ : 95/06/26 ~aX EEC STZE : !024 FILF TYP~ : LO L~ST FILE : **** FIbE HEAD~R **** FIbE NA~E : EDIT .007 SERVICE : FLIC VERSION : 001C0~ DATE: : 95/06/26 ~AX RFC SIZE : 1024 FIL~ TYPE : LO LAST FIbE FIL~ HE~,DER FTLE NUMBER 7 CURVES Curves and log header ~ata ~or e~ch pass in separate files; raw bac~uroupd pass in last file P~S$ NU~BER: I DEPT~ INCREMENT: 0,5000 # FILE SUM~RY VENDOR TOOL CODE START DEPT~ TOTP 5 , 61~'0 $ OG HEADER DATA D~TE bOGGED: SOFTWARE ~ERSIO~: TI~E LOGGER ON BOTTOM: ?D DRILLER CFT); TO LOGGER(FT): STOP DEPTH 26-NAY-g5 42 2 10~9 28-~AY-95 5612.0 0.0 ,IS ~aee Verlficatton I..;lstInq lcblumberger AlasKa Computinq Center 26-JUN-1995 16:34 TDTP TDTP TDTP TDT? TDTP $ ~OP LOC, INTERYAL (FI): P_,OI'lr];~ L~G INTERVAl, (FI): 'LOGGImG SPEED (FPHR)~ DEPTM CD~.~TDGL USED (YES/N[)): q'OOb STRING (TOP TO BOTTO~) VM~D[]P TOOL CODE TOOL mYDE ]5~P THCP~,~L DECAY GAMNA RAY TNER~q~b DECA~ THERFAL DECAY TNE~MAL DECAY THErmAL DECAY THER~AL DECAY T.ER~I, DEC~Y ~OREHO[,E AND CASING DATA OPEN MOLE BIT SIZE (IN): D~I'LLERS CASING DEPTH (FT): LOGGERS CASING DEPTH (FI): Drf!~ Ei-~OLE CONDITiC~b~$ FLUID TYPE: FLUID DE~$tTY (LG/G): SURFACE TEY~PERATbRE (DMGF): bOTTO~ HOLE TE~PERATUPE (DEGF): FLUID SALINITY (FP~): F[,UID LEVEL (FT): FLUID RATE AT ~ELLHEAD ~ATER CUTS (PC'T): GgS/OIL ¢~TIO C¢~OKE (DEG.) ~,~ E[I'I' ~ ON TOO~ TOOL TYPE (~PI'THER~,~Ab OR THER~,~AL): ~ATRIX: ~tATRIX DE;~'.~SlTY: ~{OLE CORRECTIOq 0.0 0.0 1800.0 H 0 TOOL NUMBER CGR$-A-8~O CPSC-A-824 CPLS-A-778 TDIC-A-815 TNC-P-X2 TND-P-BX~ CTSh-A-IO 6992.0 PRODUCED FLUIDS P~LL}ELINE COUNT RATE aOR~¥~AI,iZATION IN OIL ZONE 'POP NOR~ALIZIf~G ~;INDOW (FT): ~ASE NOR,4ALIZING WINDOW (FI): BI~UELINE CO~T RATE SCALES SET BY FIELI) ENGINEt+.:R FAR COUI~T RATE LOw ~ECAI~E (CPS): 0 FAR COU~T RATE HIGH SCALE fCPS); 13000 fqEAR COU~,~T RATE L(}t,~ SCALE (CPS): 0 ~.~EAR COUP, IT RATE HiGH S(~.A[,E (CPS}: 30000 TOOL STAP~OfPFF (IN)~ PE~,~ARKS: TIED ]~T{'} ATL~S f~HC DATED 416188 .... ~ SEAWATER PAGE: ,IS Tape Verification Listinn ;chlumberoer AlasKa Comp,!tinq Center 26-JUN-~,995 16:34 OISPisACPZ;) ANi3 bOGGED AT 4-'5 BP.~.TMEN PUT WEL4 ON INJECTION CO~.~I' RATES LOW ~'~R PER~'S CAU6ING STPAIGHTbiME DATA PAGE: ¸24 ** DA'fA FSRD~AT SPEC].FICATIG;~ RECORD ** ** SET TYPE - 64k~ ** TYPC ~EPR CODE VALUE l 66 0 2 66 0 3 73 88 4 66 1 . 5 66 6 73 7 65 8 68 0,5 9 65 FT i!,. 66 !I I? 68 t3 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NA~E SERV UNIT SERVICE API API APl API FILE NUMB NUMB SIZE REPR PROCESS ID ORDE~ # bOG TYPE CLASS ~OD NUMB SAMP ELEM CODE {HEX) DEP7 FT 501044 O0 000 O0 0 7 I 1 4 68 $IG~ PS1 CU 501.044 O0 000 O0 0 7 1 i 4 68 TPHI PS1 PI) 501044 O0 000 O0 0 7 1 1 4 68 8BHF PSI CU 501044 O0 000 O0 0 7 I I 4 68 SBBN PS! CU 501.044 O0 OOO oo 0 7 1 1 4 68 $IGC PS1 Ct) 5u~044 O0 000 O0 0 7 i 1 4 68 SIB~ PS1 CU 501044 O0 000 O0 0 7 1 1 4 68 TRAT PSI 50~044 O0 0©0 O0 0 7 1 I 4 68 SDS~ PS1 CU $01044 O0 000 O0 O 7 1 I 4 68 B~CK PSI. CPS 501044 O0 000 O0 0 7 I 1 4 68 F~AC PSI CPS 501044 O0 000 O0 0 7 1 1 .4 68 TCAN PS] CPS 501044 O0 000 O0 0 7 I I 4 68 TCAF PS1 CPS 501044 O0 000 O0 0 7 I 1 4 68 TCND PSI. CPS 501044 O0 OOO O0 0 7 1 I 4 68 TCFD PS1 CPS 501044 O0 000 O0 0 7 I I 4 68 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 ,IS Ta~e 'Verification I.;istinq .chlumberger AlasKa Con. put~.no Center 26-JUN-1995 16:34 PAGE: 25 ltl T~ ~_~' 8EkV U~'IT SERVICE APl APl AP1 FILE N NUmB S Z R ESS Yb OR[)E~ ~ hOG TYPE CLASS ~t)D NUmB SA~4P EbEM CODE (ilEX) [;';~. ......................... ! CPS 50~044 O0 0(,0' ....................... O0 0 7 I ~ .... '4 68' .... ~'''~;;;;;''000 CF PS1 CPS 50104~ O0 000 O0 0 7 ~ X 4 68 0000000000 ~'~9 PS~ CPS 5~1044 O0 000 O0 0 7 I I 4 68 0000000000 FD PS~ CPS 5U~044 O0 O()O O0 0 7 1 1 4 68 0000000000 ~$ PSt bB 501, u4.~ O0 000 O0 0 7 I I 4 68 0000000000 GR PS1 GAPI 501044 O0 000 O0 0 7 I 1 4 68 0000000000 CCL PS! V 50~ 044 O0 00~> O0 0 7 1 1 4 68 0000000000 DEPT. 5b~O.O00 SIG~.PS1 26.658 TPHI.PS1 44.554 SBHF,P$I SBHN.PS; 35.3~2 SIGC.PS1 1.945 SIBH,PS! 35.322 TRAT.PS1 SDS~.PS1 0.899 BACK.PSi 76.754 FBAC.PSI 23.748 TCANoPS! TCAF,PS~ 8249.9~6 TC~D.PS1 ~0986.~87 TCFD.PS1 6027 9~0 TSCN.PS1 TSC~'.PS1 1444.9~3 I~JD,PSI 1!43.1~6 2 ~. ol 392[ 05 TENS.PSi G~;'.PSt. 11.664 CCh. PS1 0.000 DEPT. RlO0.O00 SIC~,PS! 27.895 TPHI.PS1 53,403 SBHF.PS1 SB~'.PS1 54.971 SI..~C,PSi~ 5.306 SIBH,PS1 57,628 TRAT,PS1 SDST,PS1 1.367 ~ACK.PSI 16~.965 FBAC,PS1 23.470 TCAN,PS1 TCAF.PS) 4514.967 TCNQ.P$1 13746.459 TCFO,P$1 3~96.720 T$CN.PS1 TSCF,PSI 5~8.5~(} INUD.PSI 1255.653 INFD,PS1 278.750 TENS.PSi GD.PS1 7.69i CCL.PSI 0.000 030 26592,691 4616 34 1625~ 348 175:827 485'000 F!LF ~,~!~i~E : EDIT .007 S~qR¥ ICE : FhlC VE~SIO?~ : O0~COI D~IF : 95/06/~6 ~AX REC SIZE : FIL~ TYPE L~ST FILE **** FILE HEADER **** FILM ~E : SFRVtCE VERSIO~ : O01CO]. D~TF : 95106/26 ~iaX REC SIZM : F!LF TYPE bAST FILE : ,IS Tape verif.~catioD I, lstin~ ,chlU,~ber, c~or Alaska Co~r~put!Dq Center 26-JUN-19q5 16:34 PAGE{ 26 FILF HE},DER FILV NUY:~ER 8 Curves and lo~j fleader data for each oass in separate ~iles; raw bacK~round pass In ~ast file FILE SL.J ~4 ~ RY TDTP 561] 0 bOG N~AD~ DATA DATE LOGGED: ~OFT;~ARE VERS!F!~q TI~E LOGGER TD D~ILLER (FT) TD LOGGER(ET): TOp LOG I~TERV~L ~OTTO~ LOG I~,!TERVAL (FT): [.,~GG I ~G SPEED PEPTH COMTRQL TUfT)L, STRI~,iG {TOP TO BOTTOm4) TDTD THERhAL DECAY TDTP GAd~A RAY TDTP THER~¥~Ab DEC~Y TDTP T H E'R ~4.,~, L DECAY TDTP THERt4AL OEC~Y TDTP TI~tERNaL DECAY TDTP THER~AR DECAY TDTP TNED~IAR DECAY ~OREHr3LE AMO CASIi:~G DATA OPE~ NOLE 5IT SIZE (I~): ORI[,LERS CASI,~.~G t)EPT~ ~OGGERS CASING DEPTH BORENObE ~'LUIO DE~$1TY (LB/G): SURFACE TEMPERATURE (DEGF) BOTTOm; HOLE I'E~'4PERATURE (DEGF) FLUID SALIDJITY (PP~): FLUID bEVEL FLUID RATE ~ATER CUTS {PCT) GAS/OIb R~TIO: CHOKE (DEG) TOOL STOP DEPTH 5499.0 26-HAY-95 42.2 1059 5612.0 (), 0 0,0 0.0 1800.0 28-MAY-95 TOOI~ NUMBER ~' flOW CGRS-A-820 CPSC-A-824 CPLS-A-778 TDIC-A-815 TNC-P-X2 TN'D-P-BX2 CTS~4-A-10 6992 PRODUCED FLUIDS :IS WaDe v.r~.f]catton 51st. lnc~ chlumberger Alas~o Comput!n0 Center 2B-JUN-1995 ]6:34 f~ aTRIX HOLE IqLIJELINE COtlNT ~ATE NOR!~ALIZATIO~,t l~,i OIL ZONE ,~u~;~ADIZING WI~DOW (FT): !~,Lb Lt~E CO[!~T ~,&TE S ALES SET BY' FIELD ENGINEE~ FA~ COUi~T RATE LO~; SCALE (CPS): FAR CO~.~,;T RATE HIGH SCAI~E (CPS): ~4EAR CF:~U~T RATE bOW SCab~ CCPS): TOOL STA~IDOFF (I~.~): TIED li-~TO ATLAS B~C OATED 4/6t~$ 0 13000 0 30000 ~[.!~P~D 295 B~LS BORAX FOLLOWED BY 287 BBLS SEAWATER DISPLACED AND LOGGED AT 4-5 BPM.THEN PUT ~ELb ON INJECTION AT 12 BP~ AND i280 PSIG COUNT R~TES LOW NEAR PERFS CAIISING STRAIGHTL1NE ~****THIS IS BORAX PASS #1'*~*~ $ LIS FORMAT DATA PAGE: 27 DATA FORMAT SPECIFICArIO,~J Rgg, ORi) ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE i 66 0 2 6~ 0 3 73 88 5 66 6 73 7 65 ~ 68 0,5 9 65 1,2 68 13 66 0 14 65 i5 66 68 16 66 0 66 IS Tare verification Listing chlumberger AlasKa Compt.ltinq Center 26-dbN-1995 16:34 ** SET TfPE - CNA~,~ ** ~,t A ~ F $'"r.,R V U N !T . ICE A A ORDER ~ LOG TYP .................... ; .......... D~PT FT 5004q 00 8IG~: PS2 CU 501044 O0 000 TPH! PS2 PU 501044 O0 SBBF PS2 CU 501044 O0 SBH~} PS2 CU 50~044 00 000 8IGC P5~ CU 501 044 O0 000 $IB[~ PS2 CU 501044 O0 T~AT PS~ 50104q O0 ()00 898! PS2 CU 501044 O0 000 BIC~ PS2 CPS 501044 O0 060 F¢Ac PS2 CPS 501044 TCA~,~ PS2 CPS 501944 O0 000 TCAF mS~ CPS ~01044 O0 000 TCN~ PS2 CPS 501 044 O0 000 TCFh PS~ CPS 501044 O0 000 TSCt, i PS2 CPS 501. 044 O0 000 TSCF PS2 CPS 501044 O0 000 INND PS2 CPS 501044 O0 INFD PS2 CPS 501044 O0 000 TENS PS2 LB 501044 O0 000 G~ PS2 GAP150~044 00 o00 CCh P$2 V 501044 00 000 E CLASS ~OD NUmB SAMP EbEM CODE (HEX) '''30 ............. 0 8 ; ..... 1~ ..... ; ..... O0 0 8 1 1 4 68 0000000000 O0 0 8 I 1 4 68 0000000000 O0 O 8 1 1 4 68 0000000000 O0 0 ~ I I 4 68 0000000000 O0 0 8 1 i 4 68 0000000000 O0 0 @ I 1 4 68 0000000000 O0 0 g I 1 4 68 0000000000 O0 0 ~ 1 1 4 68 0000000000 O0 0 8 1 I 4 68 0000000000 O0 0 8 I 1 4 6~ 0000000000 O0 0 8 1 1 4 68 0000000000 O0 0 8 1 1 4 68 0000000000 O0 0 8 1 1 4 68 0000000000 OU 0 @ 1 1 4 68 0000000000 O0 0 8 1 1 4 68 0000000000 O0 0 8 1 i 4 68 0000000000 O0 0 8 I 1 4 68 0000000000 O0 0 8 1 1 4 68 0000000000 O0 0 8 1 i 4 68 0000000000 O0 0 8 1 1 4 68 0000000000 O0 0 8 I 1 4 68 0000000000 '28 DEPT 5620.000 SiGiq. PS2 8BH~:PS2 I08.239 SIGC,PS2 8DSI.PS2 2,177 BACK,PS2 TCAF,PS2 1884.965 TCND'PS2 TSCF.PS~ 94.406 INND.P$2 GP.PS~ 13.695 CCh'PS2 DEP? 5521.500 8IGM.PS2 SBB~):P$2 89.46'7 $IGC.PS2 SD$I.PS~ 0.761 BACK,PS2 ' W . TCND,PS2 ICA .PS2 4492 853 %SC. ,PS2 832 660 IiqND.PS2 GP.PS~ 13.234 CCL.PS2 ** E~{D 07 DATA ** 38,764 TPBI'P$2 25'259 SBHF,PS2 2.922 SIBH,PS2 137-414 TRAT.PS2 72.378 FBAC.PS2 28.614 TCAN"PS2 4525.321 TCFD.PS2 1281'979 TSCN.PS2' 1149.808 INFO.PS2 385..571 TENS.PS2 0.000 71.665 FBAC.PS2 I5' 382 TCAN.P$2 99t4.477 TCFD,PS2 3476.752 T$CN.PS2 i145.~'32 INFO'PS2 439.016 TENS.PS2 0.000 92~49 1 ;: 015 '5 t65,040 3'520 77'909 l' ~ 497 10275'662 g 0 4 ,: 8 8 680,000 I$ Tane Verification Llstinu cblumberoer Alaska Computi. nq Center 26-JUN-1995 16:34 PAGE: 29 **** FILE TRAILgR **** SFRVICE : FGIC VERSIO,~ : O01CO! DaTF : 95/06/?6 MAX R~C $IZF : 1,024 FIL~ TYPE : LC! LAST FILE : **** FILM HEADER **** FILF ~A~'~g : EDIT .009 SERVICE : FLIC VERSION : O0ICO1 DATF: : q5/06/26 MAX REC $IZ~ FIL~ TY~E : LO LAST FILE Curves and log aeader data ~or each uass in separate ftles~ raw background pass in last file .,,,,,, a~ 3 DEPTH INCREMENT: 0.5{!00 F~LF SUN~ARY VENDOR TOOL CODE START DEPTH TOTP 6 53'0 LOG itEADER DA~A DATg DOGGED: SOFTWAPE VERSION: TI~E LOGGER ON BOTTOm: TD DRILLER (FT): TO bOGGER(FT): TOP BOG INTERYAb (ET): ~OTTO~ [,OG INTERVAL I,O(;GING SPEED (FP~R): D~PT~ CONTROL USED (YES/NO): TOOL STRIi~!G (TOP t'O VENgOR TOOI~ CODE TO!iL TYPE ,, ~ ~ T~iERMAL DECAY Ti) Tm T~gRi~Ab DECAY Tr)TP T~CRMAL i)ECAY T~)TP TNERMAL DECAY STOP OEPTH 26-MAY-95 42 2 I0~9 56!2.0 0.0 0.0 0.0 1800'0 28-MAY-95 TOOL NUMBER ~:'~'''''''D~ CGRS-A-~20 CPSC-A-8~4 CPLS-A-77B TDIC-A-8~5 TNC-P-×2 IS 'rape Veri~tcation Llstin~ chlumberger AlasKa ,Computing Center 26-JON-~ 995 16:]4 T 01' P TOTP $ THERMAL OECAY TND-P-B~2 i3Rit, bERS C~SING UEPTil (FT): LOGGERS CA$Ii~G DEPTH ~OREHOLE COSDITIf.)~$ FLUID TYPE: FLUID DE~SITY (LB/G): S~RFACE I'M~PERAT~E (DEGF): ~OTTO~ HOLE ~E~iPER~TU~C FLUID SALINITY FLUID bEVEL FLUID RATE AT WELLHEAD (BP~): w~7'ER CUTS (PET): GAS/OIL RATIO: CHOKE (DEG): T ~ 0 N T 0 0 L TOOL TYPE (EPITHER~L OR THERMAL): ~ATRIX: ~ATRIX HOb~ CORRECTION (IN): 699~.0 PRODUCED FLUIDS B[.,UELIME COUNT RATE NOR~ALIZATION IN OiL ZONE TOP NORMALIZING WINDOW (FT): ~ASE NOR~.~;.I~IZING WI~DO~ (FI): 8LUEL!NE COUNT RATE SCAt, ES SET BY FIELD EMGINEER FAR COUNT RATE LOW SCALE (CPS): 0 ~ FAR COUNT RATE HIG~ SCALE [CPS): 13000 NEAR COONT RATE LOW SCALE (CPS): 0 < NEAR COdNT RATE }4IgH SCALE (CPS): 30000 : TOOL STANDOFF (iN): ~EMARKS: :TIE[) INTO ATLAS BHC DATED 416/88 PU~PED 295 BSL$ BORAX FOLLOWED BY 287 BBU$ SEAWATER DISPLACED ANO BOGGED .AT 4-5 BP~.T~E~ P~T WELL ON INJECTION AT 12 BP~ A~D 1~80 P$IG COUNT RATES LOW NEAR P'ERFS CAUSING STRAIGHTLINE *****T~iIS IS BORAX PASS #2'**** $ LIS FORMAT DATA PAGE: ]0 ~I$ Tape Verificatioo l,istino ichlumberger Alaska Computino Center 26-JUN-l, 995 16:34 PAGE: ** DA:I'A FORMAT SP~CIFICATI[]~ RECO~D ** TY~E REP~ CODE VALUE i 66 0 2 66 0 3 73 4 66 I 5 66 b 73 7 65 ~ 68 0,5 9 65 11, 66 11 12 68 1] 66 0 i4 65 FT 15 66 68 i6 66 0 66 ** SET 'riPE - CHAN ** RV U!~JIT SERVIC~ bPI API APl · . ILE N ~ NU B SIZ REPR P 85 ~D (')RDE~ ~ hOG TYP~ CLASS ~OD NU~B SA~P ELEM CODE (HEX) .............................................. FT 50~ 044 O0 000 O0 0 9 ~ ................ 1 4 '~''''~';;~''''0 O0 SIG~ 083 Cu 501944 ¢)0 OOO O0 0 9 1 1 4 68 0000000000 TPHT PS3 PU 501044 O0 0o0 Og 0 9 I I 4 68 0000000000 SBHF P53 C~ 50~.)44 oo OOO O0 0 9 1 I 4 6~ O000OO0000 SB},{~ PS3 CU 50]044 O0 GOO O0 0 9 I i 4 68 0000000000 SIGC PS,] CIt 5~310~ oO 000 O0 0 9 i I 4 68 0000000000 SIB~ PS3 CU 50!.044 O0 O00 O0 0 g 1 I 4 68 0000000000 T~AT PS7] 50104q O0 000 O0 0 9 1 I 4 68 0000000000 SDST PS3 CU 501044 O0 goo OO 0 9 1 1 4 68 0000000000 BACK P$3 CPS 5o!.o4~ OO 000 O0 0 ~ I 1 4 68 0000000000 FBAC PS3 CPS 5u1044 OO 000 OO 0 9 1 i 4 68 0000000000 TCAN PS3 CPS 501O44 O0 000 O0 0 g I I 4 68 0000000000 TCA~ PS3 CPS 50104,4 gO OmO O0 o 9 1 1 4 68 0000000000 TCN~ ~$] CpS 5o~044 O0 OOu O0 o 9 I 1 4 68 0000000000 TCFD P53 CPS 5u1944 OO o00 O0 o 9 ! i 4 68 0000000000 TSC~ PS~ CPs 5ul<)~ OO 00o O0 0 9 I I 4 68 0000000000 TSCF PS3 CPS 5;)~04,4 OO {)00 oO o 9 I i 4 68 0000000000 INND P$3 CPS 5<)1<)a4 Ou OoO O0 6 g 1 I 4 68 0000000000 I~FP '~$3 CPS 5;)104,4 Oo 000 O0 n 9 1 I 4 68 0000000000 TEN~ ¢83 Lg 50~044 O0 OOO O0 0 9 1 1 4 68 0000000000 GR PS3 GAP/' 501944 O0 ~0(:) O0 0 9 1 I 4 68 0000000000 CCL PS3 V 5u1044 O0 o00 O0 0 9 I 1 4 68 0000000000 ]1 ,IS TaDe Verification Listing ;chlumheroer AlasKa Co.~putino Cemter DFPT. 5~g7.5o0 SIG~q. PS3 S~M~.PS] 87.079 SIGC,PS3 S~SI.PS] 0.475 ~ACK.PS3 TCA~.~S3 5217.323 TCNO.PS3 T$CF.PS3 luSfl.7~ I~ND.PS3 GP,PS] 17.172 CCL.PS3 26-jUN-1995 16:34 23.174 TPHI.PS3 0.O00 SlBM,PS3 92.4b0 FBAC.P$3 4312.5~5 TCFD.PS3 1090.333 INFO.PS3 0.000 18.512 TPMI.PS3 0.]12 SlBH.PS] 80.952 FBAC.PS3 10~72.182 TCFD-PS3 1058.212 INFD,PS3 0.000 19.994 SBHF.PS3 127.553 TRAT.P$3 46.582 TCAN.PS3 . TENS.PS3 PAGE~ 111.739 1,225 831,740 154,632 685,000 67.432 9171. 887 695.000 32 **** FiLE TRAILER FI,L? ~,~A~{E : EOIT .009 S~RV[C~: : FbIC VgRSIO~ : O01COI D~TF : 95/06/26 NaX R~:C, SlZ~ : ['lh~ ~YPE : LO LAST FILE : **** FILE UEAD!~R **** FILM NAmE : EO!T .010 SERVICE : FbIC VERSION : o0!C01 DATF : 95t06/.~6 ~A.X REC S:[Z[~] : 102,4 FTL~ TYP~: : LO LaST Pirie : FIL~ ~EAOER RAW CURVES Curves and loq header PASS .~!]iqSER: DEpT~-{ I'~CREMENY: FTLF SL!~q~,~ A RY VE~'~DO R TOOL data 4 for START DEPTH each pass in separate STOP DEPTH 5498, files; raw baCKground pass in last f:lle ,IS Taea Verification Listino ~CblUmberoer AlasKa Computing0 Center 26-JUN-~995 16:34 PAGE: 33 DATE bOGGED: $OFTW.~RC VERS,[~: wI~4E LOGGER VD DRILLER (FT) mD LOGGERCFT) TOP LOG INTERVal, ROTTO~ LOG i~TERVAI, (FT): LOGGING SPEED DEPTH CONTROL ~,]MEO (YES/NO): TOOL STRING (TOP 'fO ROTTO?4) VENDOR TOOL COOE TO(~L TYPE -;[; ..................... T TqERMAL DECAY TH, ERMAL DECAY T~ER~AL DECAY T~!ER~ AL DECAY THERMAL DECAY THERN~AL DECAY T~E,R~,~AL DECAY TDTP TDTP TDTP T ~ T P TDTP TDTP TDTP $ OPE:N HOLE BTT SIZE DRILLERS CASING OEPTH EFT): LOGGERS CASING DEPTH EFT): BC, REHOLE CONDIT IOi'.iS FLUID TYPE: FLLiID DENSITY (LB/G): St~RFACE 17E~4PE~TORE (DEGF) BOTTO;'~ HOLE] TE~;~PERATIJRE {DEGF): FLUID SAblt~i~TY (PP~4): FLUID LE'VEb (FTf): FL~]IO .RATE ~T WELLHEAD GAS/OIL RATIO: CHOKE (DEG)~ NEUTRO~ TOOL TOO[, TYPE (EPITHERMhL OR THERMAL): aATRIX: aATRIX DENSITY: HOLE CORRECTIOi~ (IN): 26-~AY-95 42.2 1059 5612.0 0.0 0.0 0,0 1800.0 NO 28-MAY-95 TOOL NUMBER 2' MOW CGRS-A-820 CPSC-~-~24 CPLS-A-778 TDIC-A-815 TNC-P-X2 TND'P-BX2 CTS.-A-lO 6992,0 PRODI~CED FLUIDS t~I, UELI~E COUf'~T RATE i'~OR?IALIZATION I~! OIL ZONE TOP NOR~!Ai..~!ZIi~!G ~.~t~1DO~i (FT): SASE ~OR~:4ALIZING ~I~,~DOW (FT)~ BLUELINE CO~.~:,.!T RATE SCALES SET BY FIELD ENGINEER FAR C('.]IIaT RATE L[)~ SCALE (CPS): O PAR Cf..lt.!~"!' PATE MIGM SCA~E (CPS): 13000 mis Tare verlf, lcation Listino ~chlun, berqer AlasKa ComputinO CeDter 26-JUN-1995 16:34 NE;AR COU:qT 2A'rE .IGH ~CAI, E (CPS): 30000 STA~Dr. IFF (~N): ~Et,.~ARKS: TIED I~'.~TO ATbhS B~C OATEO 416188 ~IJ~qPED ~g5 ;~B[,S ~flRAX FOLLOWED BY 287 BBbS SEAWATER UI6mLACED AND LOGGED AT 4-5 JPM,TNEN P~T W~LB ON INJECTION AT ~ ~PF~ A~O i280 COU~T ~A~.(~E6 bOW :~EA~ ~E~FS CAUSING STRAIGHTLINE F'DR ~4 AT DATA PAGE: ¸34 ** fA'PA FOR,~-~AT SPRCIFIC~TIOM RECORD ** SET TYPE - 64E8 ** TYPE REPR CODE VALUE 66 2 66 0 3 73 88 4 66 5 66 6 73 7 65 8 68 0,5 9 65 11 66 1~ 68 1~ 66 0 14 65 PT ].5 66 68 16 66 0 66 I ** SET TYPE - CHAN N~ME SERV U~iT SERVICE API AP~ API API FILE NUMO NU~O SIZE' REPR PROCESS ID O~DER ~ bOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 501044 O0 000 O0 0 10 I 1 4 68 $IG~ PS4 CU 501044 O0 000 O0 0 10 1 1 4 68 TPH! PS4 PU 501044 0~1 000 O0 0 10 i 1 4 68 8BHF PS4 CU 50~044 O0 000 O0 0 I0 1 1 4 68 SBHN PS4 CU 501044 O0 000 O0 0 !0 1 1 4 68 $1GC PSa CO 501044 00 000 00 n 10 1 1 4 68 8IBM PS4 CU 501044 O0 000 O0 0 I0 I 1 4 68 TPAT PS4 501044 O0 000 O0 0 10 1 1 4 68 8D5I P84 Ct! 50104~ O0 000 O0 0 10 I 1 4 68 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 .IS Ta~e ~erlflcatlon tistinm ~chlu~'~berger AlasKa Comptlting Center 26-JUN-~995 16:34 PAGE~ 35 FBAC PS4 CPS 501044 OO uO0 O0 TCA~? PS4 CPS 50~04~ O0 000 O0 TCAF F'S4 CPS 50~044 O0 000 O0 TCND PS4 CPS 501044 O0 000 O0 TCFD PS4 CPS 50~044 O0 000 O0 TSC~) PS4 CPS 50~044 O0 000 TSC~ PSg CPS 501044 O0 Ot)O O0 IMND PS4 CPS 50104g O0 000 O0 INFD PS4 CPS 501044 O0 000 O0 TFNS PS4 bB 501044 O0 000 O0 G~ PS~ G~PI 50~044 O0 000 O0 CCh PS4 UNIT SEmVIC~ APl ~PI API API FILE MB PR TD ~R.[>E~ # LOG TYPE CLASS ~OD NUMB SA~P ELEM CODE (HEX) . 4 CD& 501044 O0 OOO O0 0 10 i ! 4 68 0 000000000 0 10 ! ! 4 68 0000000000 0 10 I 1 4 68 0000000000 0 ~0 1 1 4 68 0000000000 0 ~0 1 1 4 68 0000000000 0 !0 1 1 4 68 0000000000 0 10 ! 1 4 68 0000000000 0 10 1 1 4 68 0000000000 0 10 ! 1 4 68 0000000000 0 10 1 1 4 68 0000000000 0 10 1 I 4 68 0000000000 0 10 1 1 4 68 0000000000 DEPT. 5620.000 SIG~.PS4 SBH~:.PS4 104.~4'7 $IGC.PS~ SDSI.PS4 36.i91 MACK.PS4 TCAF.P$4 167.780 TCND.PS4 TSCF.PS4 31.542 INNO.PS4 GP.PS4 28.405 CCh. PS4 DEPT. 549o.000 SiGM.PS4 $~H~.PS4 92.855 SIGC.PS4 SD~T.PS.% 0.707 BACK,PS4 TCAF.P$4 4195,91[ TCND.PS4 TSCF.P$4 8~1'505 I!~ND.PS4 G~.PS4 20.484 CCh. PS4 0.000 SIBH,PS4 1221 290 TRAT.P$4 95.612 FBAC.PS4 41.477 TCAN.P$4 3991.016 TCFO.PS4 1010.922 TSCN.PS4 1087.051 INFO.PS4 374.825 TENS.PS4 0.000 20 491 TPHI.PS4 47.755 SBHF.P$4 0[000 SIBH-PS4 !!8.252 TRAT.P$4 80'902 FBAC,PS4 i6'4351 TCAN.PS4 9175.016 TCFD.PS4 2816. 32 T$CN,P$4 1105.518 INFD,PS4 344'880 TENS'PS4 0.148 O, 4 41. 8, 7o ":o 79,509 :838 1089~! 863 215:8 445 6.65 000 ** E~,,,~O i:)P DATA **** FILE TRAI[,EP **** FILE ~Ai'~,~E ' Mi) ~ .... .010 S~RVICE : FLIC VER ION : 001C01 DATF FIL~ TYPE' L~ST FILE : IS Tar,~.e Verlfication T, istlno chlumberqer Alaska ComP,-ltino Center 26-JUN-~,995 16:34 PAGE= 36 FI. LF :!A~;~:E : EDIT .011. FTL~ q'YPE : LAST FIL~F t-~E qOgR RAW CURVES Curves and !oo header data ~or each pass in separate ~lles; raw background pass in last file TDTP T D T P TDTP TDTP T O T P T 0 T ? T .r,~ 'F P T 0 :T P S DFPT~ I'~ICRE?~ENT,' 0.5000 FIbF SiJ :q!qARY UE~,iDOR TOOI~ CF1DE START D~JPT~{ LOG ~,ADE;R DATA hATE bOGGED: SOFT~,:~ ARE VERSION: TIM~:< LOGGER O~ BOTTOM: 'FD DRILLER (FT): TD LOGGE~.(FT): TOP LOG INTERVAh (FT): nOTTO~{ hOG I~,!T~]RVAL (FT): O.~,.~[~G SPEED (FPHR): DEPTH CO*)TROL USEO (YES/Nj)): TOOL ST~!NG (TOP TO BOTTOM) V~6~nO~ TOOL t,,DE 'lOO[ TYPE MAb DECAY GA g'~t A RAY THERMAb DECAY THER.~A L DECAY THER~ AL, DECAY 'f%,{ER ~AL DECAY THE~,MAL DEC Y T~ ER~,AS t:~gC A,Y AND CA~ING DATA HOb~; ~%IT SIZE DRI[,bER$ CASING DEPT¢{ (FT); hOG(;ERS CASING DEPTH STOP DEPTH mmm~'m'm~mmmmmm*m~m~ 498.0 ~6-~AY-95 42,2 1059 28-~A¥-95 5612.0 0,0 0 0 0 ~ 0 1800.0 TOOL, NUMBER 2 ' ~l D W CGRS-A-820 CPSC-A-824 CPLS-A-778 TDIC-A-815 TNC-P-X2 TND-P-BJ~2 CTSM-A-IO 6992.0 IS Ta~e Verification I.,istlno chlumberoer AlasKa Computimo Cen~ter 26-JUM-1995 16:34 ?LUID TYPE: FLUID DE:"~SITY (LS/G): SilRFACE TE~LnERATilRE (DE~F): FLUID SAbIi~ITY (PPis): FLUID LEVEL (FT): ~ATER CUTS (PCT): GAS/OIL C~{OKE (DEG ~,~E~;7'RON TOOL, TOO[, TYPE (EPITNERNAL ~:~ATR IX DE~JSITY HOLR CO~RECW!O?t BL[,IELINE CO~I'~T RATE ,~OR~iALIZATION 1N OIL ZONE TOp NOR~AbIZI~qG wi~DO~ (FT): ~ASE NOR,',~IAI~iZI~'JG ~I,'~DO~; (FT]~ ~%[,UELINE COU~:,~T RATE SCALES SET BY f'IELD EMGINEER FAR COUNT RATE LO~ SCALE (CPS): 0 ~AR COIINT RATE HIG~ SCAB~ (CPS): 1,3000 ~>~EAR COU~T RATE LOw SCALE (CPS): 0 ~".I'MAR COU~]T RATE HIGH SCAI~E (CPS): 30000 TOOL STA~]DOFF (l~): ~E~:~A'RK~: TIED !i~'~TO ATLAS BF~C DATED 4/6/88 PRODUCED FLUIDS PUiaPED 295 ~BI.,S $ORAX FOLLOWED BY 287 BBb8 SEAWATER 0ISPbACED ANO LOGGED AT 4-5 BP~:i. THEN: PUT WELL ON I.NJECTIO. AT I2 c ,~ O 1280 PSIG COOMT RATES b{,]~ NEAR PERFS CAUSING STRAIGHTLiME LIS F[.~R~,~AT DATA PAGE: 3.7 ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64MB ** i 66 0 2 66 0 3 73 88 5 66 6 73 7 65 8 68 0,5 cblumberger AlasKa Computlno Center 26-jUN-1. g95 16:34 PAGE: 38 11. 66 12 68 13 66 0 4 65 FI 5 66 68 1 1 1 0 ** $~T ~YPE - C~AN i4A~ SERV UNiT SERVICE API II) O~DER # 50G I PE CLASS kiOD , ~ , 501,044 O0 000 O0 0 SIG~ PS5 CU 501044 O0 000 O0 0 TPHI PS5 PU 501. o44 Od 000 O0 0 SBHF PS5 CI/ 501044 O0 000 O0 0 SBH~! PS5 CU 501044 O0 000 O0 0 STGC PS5 CU 501044 O0 000 O0 0 SIB~ PS5 C!,~ 501044 O0 000 O0 0 TRAT PS5 501044 O0 000 O0 0 SDS! PS5 CU 5O1044 O0 000 O0 0 BAC~ PS5 CPS 501044 O0 000 O0 0 FBAC P$5 CPS 501044 O0 ()00: O0 0 TCA~(~ PS5 CPS 501044 O0 000 O0 0 TCAF PS5 CPS 50104.4 O0 OOO O0 0 TCND PS5 CPS 501044 O0 000 O0 0 TCFD PS5 CPS 50104~ O0 OOO O0 0 TSCN PS8 CPS 501044 OO OOO O0 0 TSC~ PS5 CPS 501044 O0 000 O0 0 INND PS5 CPS 501,044 O0 000 O0 O INFD PS5 CPS 501044 O0 000 O0 0 TENS PS5 bB 501044 00 000 O0 0 G~ PS5 GAPI 501044 O0 000 O0 0 CCL PS5 ~ 501044 O0 000 O0 0 ~m FILE NUMB NU~4B SAMP 11 1 t 1 'i 11 1 11 1 11 1 ll 1 11 I 11 1 11 1 11 1 11 1 11 1 11 1 11 I 11 ! 11 1 11 1 11 1 1,1 1 11 1 11 1 NUMB SIZE REPR PROCESS ELEM CODE (HEX) 68 000000000 4 68 0000000000 4 68 0000000000 4 68 0000000000 4 68 0000000000 4 68 0000000000 4 68 0000000000 4 68 0000000000 4 68 0000000000 4 68 0000000000 4 68 0000000000 4 68 0000000000 4 b8 0000000000 4 68 0000000000 4 68 0000000000 4 68 0000000000 4 68 0000000000 4 68 0000000000 4 68 0000000000 4 68 0000000000 4 68 0000000000 4 68 0000000000 ** {,.3AT~ ** DEPT. 5620.000 SIC>~,P$5 20,204 TPHI.PS5 SBfl~,PS5 106.103 $iGC,PS5 0.000 SIBH.PS5 SDST,PS5 0.430 RACK,PS5 119.239 PBAC.PS5 TCAW,PS5 163,645 TCND,PS5 3867.739 TCFD,P$5 TSCP.PS5 3!.,827 Ii'~ND,PS5 1090.487 INFD,P$5 GP,PS5 63,031 CCL,PS5 0,000 3 '138 $BHIF.P$~ 1.22;477 TRAT.PS5 45 288 TCAN.PS5 1055!358 TSCN.P$5 357 lo8 TENS,PS5 405.' 487 .78,863 655.000 IS 'TaLe verif~ cation [~lstlno chlumber~]er AlasKa Computing Center 26-JUN-1995 16:34 DEPm. 5497.000 5IG~.P$5 $~H~.P$5 gg.121 $!GC.PS5 8DSI,PS5 0,635 ~AC~.PS5 TCAF,PS5 423~,372 TCND,FS5 TSCF,P$5 ~g,649 IN~O.PS5 G~,PS5 46.906 CCh. PS5 2t.07~. TPMI,PS5 100.499 FBAC,P$5 g442,764 TCFD,PS5 1087.449 INFO,PS5 0.000 49.445 SBHF.PS5 i12.276 TRAT.P$5 21,718 TCAN.PS5 2886,459 TSCN,P$5 351.733 TENS,PS5 67,394 2199.378 665.000 DATA **** F'[LE TRAILER FIL~ NA~E : EDIT S~RVICE : FLIC VFRSIOi~ : 00lC01 DAT~ : ~AX R~C SIZE : 10~4 F!L~ TYPE : LO 5AST FILE : **** FILE HEADER FTLF NAgS : EDIT .012 SERVICE : ~LIC YER:SIO~{ : OO1COI DATE : 95/06/26 M~X REC S'~ZE : 10~4 FILF TYPE : LO FILE NEADER FILE ~.~UNBER 12 RA~ CURVES Curves and loq header data for each pass in separate ~iles; raw background pass in last'file pASs ~i!~$'gR: 6 DEPmH Ii4CRE~EO~T: 0,5000 FILE SU~4~ARY VENDOR TOOL CODE START DEPT~'~ , 0 $ LO(; hEADeR DATA OATS I~OGGED: SOFTWARE q'I~E LOGGER ON TD DRII,!,~ER (FT): TD LOGGER(FT): TOP LOG INTERVAL EFT): ~OTTO~ LOG INTERVAL STOP DEPTH 549~.0 26-~AY-95 42,2 1059 28-~AY-95 56!~,0 :o 0,0 chluD, ber~er AlasKa C'omputf. ng CeDter 26-JUN-1995 16:34 TOOL COOE T~Ob TYPE~ THE~,iAh DECAY 'fH~RM A!~ DECAY THeRMaL DECAY 7HERMAG DECAY ~H~D ~ AL D~CAY DORE!.}OI,F, ANO C~SIJG DATA OPEN HOt. E Bit SIZE (IN): DRIt~LERS CASING DEPTH ,LOGGERS CASI~.tG OEDT!..~ (FT): D[~'~R EHOLE COP~DITIO~S FhUI!) TYP~: FhOID DEaSITY (bl3/G): SURFACE TEMPERATURE (~EGF): .60TTO~ HOLE TE~PERATURE (DEGF): FL, UID SAblNIYY (PPM): FLUID RA'fE A'f ';;~L[~HEAD ;~a'FER CU'rS (PCr): C?~[]KE (DEG)t h?EUTRON TOOL ~.1~3[., TYPE (EPIT'HER~,~AL OR THER~AL)~ ~',i A T R I X: MATRIX DEN~ITY: . HqLE CURREC ~07~) (IN): 1800.r~ NO TOOL ;~UNBER ~' HDW CGRS-A-820 CPSC-A-824 CPLS-A-778 TDIC-A-8i5 TNC-P-X2 TND-P-BX~ CTSM-A-IO 699~.0 PRODUCED FLUIDS !!I!',~UEIi~Ti',~iE CO[JN'r RATE NOR~AL, IZA1]iON iN Oil, ZONE TOP NOR~ALIZING WINDOW (FT): ~ASE Nf)R~AbIZING wI~',aOOW (FT)~ ~'~[~U'ELI~.',JE COIJNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RA?E: [,0~ SCABS (CPS): 0 FAR COUNT RATE HiGH SCAbE (CPS); 130()0 ~EA{F~ COU~,~.t, R.~'t'E L[)~ SCALE (CP,): 0 ,,EAR CO!/NT ~A..:E HIGfi oCA[,E (CPS): 30000 ...... '"' ~H~ DATED 416188 8: 'TI~,;D I TO ATLAS " '~I!MD,~ZD 295 BBhS t~ORAX FOLi,OWED BY 287 BBLS SEAWATER DISPbACEI') A~iO LOGGED AT 4-5 BP~'t*T~EN PUT WELL ON INJECTION AT !2 ~PM A.;~O 1280 PSIG PAGE: 40 :I$ Tape Verification Listin~ ,chlumberger ^laska Computing Center 26-dUN-1995 16:34 S PAGE: 4! ** DATA FOR~AT SPECIF!C~TIOM RECO~D ** ** SET TYPE - 64Em ** TYP~ ~EPR CODE VALUE 1 66 0 2 66 0 3 73 88 4 6b '5 66 6 7~ 7 65 8 68 0,5 9 65 FT 1l 66 12 68 13 66 0 i~ 65 FT 15 66 68 16 66 0 66 ** SET 'TYPE - CMAN ** NA~4W SF6~.V UNIT SERV'[C,E APl AP1 PI ~ MB N IZE REPR PROCESS A APIFILE U ID ~RDER ~ LOG TYPE CLA6S ~OD NUmB SA~P ELEM CODE {HEX) ............ ...... .......... ........ ........... ..... ; ..... .... DEPT FT 501 9,t~ O0 000 O0 12 1 00000 oIG ~ 86 CU 501044 O0 00~ O0 0 12 1 1 4 68 0000000000 TPHT PS6 PU 50] 044 O0 000 O0 0 12 1 I 4 SBHF PS6 CU 501044 O0 OOO O0 0 12 1 I 4 SRHS PS6 CLt 501044 00 000 O0 0 1.2 I 1 4 SIGC PS6 CU 501, 044 O0 000 O0 0 12 I 1 4 8TBH PS6 CU 501044 OO 000 O0 0 12 1 I 4 TRAT PS6 50~044 O0 OOO O0 0 12 I 1 4 SDST PS6 CU 5o~044 O0 000 O0 0 12 I I 4 BaCK PS6 CPS 50],044 00 000 O0 0 12 1 I FBAC PS6 CPS 501044 O0 00{) O0 () ~2 1 1 4 TCAN PS6 CPS 5~044 O0 000 O0 0 12 1 1 4 TCAF PS6 CPS 50~044 O0 OOO O0 0 i2 I 1 4 TCN9 PS6 CPS 501044 O0 000 O0 0 ~2 1 I 4 TCFD PS6 CPS 501(}44 oo O00 O0 0 12 I I 4 TSC5~ PS6 CPS 501.04~4 O0 GOO O0 0 12 1 1 4 TSCW PS6 CPS 501044 OO 000 O0 0 12 1 1 4 IMND PS6 CPS 50i044 O0 000 O0 0 12 1 i 4 68 68 68 68 68 68 68 68 68 68 68 68 68 68 68 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 ~IS Tape ver1~ication bistin~ ;cblumberger AlasKa Como!,3tir~O Center 26-JUN-1995 16:34 42 ERV ,3~lT SEgVfCE APl APl APl aPI FILE NUMB N[jMBSIZEREPPR ROCESS O~DER ~ LO{] TYPE CLASS ~(3[) ~UMB SA~P Eh~M CODE (HEX) '~N'Z~'~ ~S6 ...... ~ ~v~u~l'"rrrrs .......................................... ~4 oo ooo oo 0 12 i 1 4"' ...... 68 "0000000000''''"" TFt,~S PS6 bB 501044 00 OO0 00 o 12 ! 1 4 68 0000000000 GR P$6 G~PI 501044 00 u0o O0 0 12 1 I 4 68 0000000000 CCL PS6 V 50~04~4 O0 O00 Oo 0 1.2 1 1 4 68 0000000000 DFPT, 5620.00~ S.[CM.P$6 21,676 TPHI,PS6 3,~6! SB~F,PS6 SBH~.PS6 106,558 SIGC.P$~ 0,000 SIBH.PS6 122,586 TRAT,PS6 SDST.P$6 0,552 BACK.PS6 !21.869 FBAC,PSb 43..~15 TCAN.PS6 TCAF,PS6 163.953 TCNO.PS6 3988,63~ TCFD.PS6 1037,704 TSCN.PS6 TSCF,PS6 ~0,760 INND,PS6 1073.473 INFO,PS6 378,038 TENS..PS6 G~.PS6 3~.a13 CCh. V86 0.000 DEPT, 5496.000 SIGM.PS6 22,039 TPHI.PS6 45,738 SBHF.PS6 SBt-iN,PS6 93.094 SIGC.PS~ O.OOO SIBH,P$6 118,633 TRAT,P$6 SDS!.PS6 0,90[* BACK,PS6 1~1.936 FBAC,PS6 21:966 TCAN,PS6 TCAF.PS6 3961,.755 TCND-PS6 ~668,797 TCFD,P$6 2680:42~ TSCN..PS6 TSCF,PS6 748,715 I~NO,PS6 11,78,924 INFD,PS6 336' 596 T~N$,PS6 GP.PS~ 46,844, CCL.PS6 4,883 94 7~8 0 738 422 961 79 ~54 670 000 75.747 1 ;751 9879,.461 1867,077 660,000 Flb~ NAqE : EDIT .012 SERVICE : FblC VERSION : O01COI DATE : 95/06/P6 RA× REC $IZ~ : 102~ FILE TYPE : L~ L~ST FILE : **** TAPE TRAILER **** SFRVICE N~ME : EDIT DATE : 95/06/~6 ORIGIN : FLIC TAPE N,A~ : 95210 PPEvIoo$ TAPE : CO~ENT : ,ARCO ALASKA D8 4-!9, PRUONOE BAY, 50-029'21791-00 IS Tape Verlflcat, ion ListIn~ chlumberger alaska Computino Center 26-JUN-1995 16:34 PAGE: 43 DnrF : 95t06/~6 0~I~ REEL ~:A~,~E : 95~10 COawI,~UA'rlON ~ : PPEVIOUS REE5 CO~4uENT : ARCO ALASKA I~IC, OS ~-19, PRUi)~OE BAY, 50-029-21791-00 RECEIVED Gas Cons. Conl~ss~pn~ Anchorage ****************************** , * ASASKA COMPUTING C~NTER * * ****************************** *mmmm~mmmmmmmmmmmmmmmmmmmmmm* ****************************** FIELD NA~E ~ PR!JDHOE BAY BOROUGH : NO~TH SLOP~ STAT~ J ~LAS~A AP! NUMBER : 50-029-21791-00 REFERENCE NO I 94395 ,IS Tape yeriAflCata~On Listin~ ~chlUmberger lasK Computin" Center 10-FEB-1995 11:42 SERVICE NAME : EDIT DATE : 95/02/10 REEl. NA~E : 94395 CONTINUATION # : PREVIOUS REEL : CO~ENT : ARCO ALASKA INC, DS 4-19, PR!]DNOE BAY ,50-029-~1791-00 **** TAPE HEADER **** SFRVICE NAME : EDIT OPIGIN .! FLIC T~P~ NA~E : 94395 CONTINUATION # : 1 P~EVIOUS TAPE : COMMENT : ARCO ALASKA INC, DS 4-19, PRUDMOE BAY ,50-029-~179~-00 TAPF HEADER PPUDHOE BAY CASFD HOb~ WIRELINE bOGS ~LL NAME: API NUMBER~ OPERATOR~ bOGOING COMPANY: T~P~ CREATION JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS~ SURFACE 50CATION SECTION~ ELEVATION(FI FROM MSL O) K~L5¥ BUSHING: DERR!C~ GROUND WELL CASING RECORD ~ST STRING ~ND ST~ING ~RD ST~ING PRODUCTION STRING ~RCO 94395 WEST BURNO 26 9O8 OPEN MOLE CA~ING DRILLERS CASING BIT SIZE (IN) SIZE (IN) DEPTH eFT) wEIGHT (LB/FT) ~3.375 ~984.0 72.00 9'625 6992.0 47.00 7,000 7993,0 ~6.00 5.500 3t!.0.0 ~,7.00 # CURVE SHIFT DATA - ALI,, PASSES TO STANDARD(MEASURED DEPTH) PAGE: IS Tape Verification Listing chlumberger AlaasK Computing Center ~ASELINE CURVE FOR bDWG TOOL CODE: bDWG CU~V~ CODE: RUN NUMBE~: PASS NUMBER! DATE bOGGED: LOGGING C~MPANY: ~ASELINE DEPTH 6653 6633 6619 6601 6567 6557 6537 6514 6513 6484 6483 6443 644~ 6419 64 6400 6~ 6366 6365 6~4~ 6330 6320 6311 6303 630! 6277 6~76 626! 6~54 6~09 6~06 6194 6~84 6~79 6175 6~49 6~46 6~28 6~20 6100 6076 0 5 0 5 5 0 5 0 0 5 0 5 0 5 0 5 ,5 5 5 0 0 5 0 5 0 0 5 0 5 5 5 0 5 5 0 0 5 0 IO-FEB-)995 ----------EQUIVALENT UNMHIFTED GRCH TDTP 88889.5 88891,5 6656,5 6635.0 6634.5 6621.5 660~.5 6603,0 6569.§ 6559.5 6538 5 6486.5 6445,0 6421.0 6409.~ 6401,5 6371,0 6368.$ 6344,0 5 6303,0 6283.0 0 6256-5 6~09.5 6i96,5 6181,0 6176,0 6t53 0 eI 9:o 6130,5 6121,0 6074,5 65i5,5 6486.0 6445,0 6421,0 6391,5 6368,5 6331,5 6303.0 6278,0 620g,0 6~86.5 6t02,0 11:42 DEPTH--- ..... -- IS Tap ChIUmb e Ve erge rification Listing r AlasKa Computing Center 6052 5 6042 5 6029 5 5994 0 5993 5 5989 0 5984 0 5975 5 5965 5 594! 0 5933 5 5930 0 5927 0 5901 5 5~92 5 5881 5 5~64 0 5859 0 5848 5 5784 5 5772 0 5763 5 5754 5 0 5 5723 0 5698 5 5670 5 0 o 5 5625 5 5612 0 5602 0 5592 0 5572 5 570 0 528 0 '5525 0 5491 5 78 0 5468 5 5462 0 5460 S 5455 0 '5451 5 5439 0 5407 5 5406'5 5384,0 5380,5 5372'5 5365 5355:5 '5:340,0 6044.0 5995,0 5989.0 5986.0 5974,5 5965.5 5940.0 5933,5 5928.0 5903.5 5882.5 5~63.5 5784.0 5763.5 5756°0 5724,5 5699.0 '5671.0 5634.5 5571.5 5527,5 5489.5 5480-0 546~,5 546,0 5457,0 5453.0 5408.0 5382,0 0 5342.0 6054.0 6031.0 5995.0 5931.5 5R94,5 5861.5 5850.5 5774.0 5740 5 5735:0 5670,5 5626 5 561~:5 5571.5 5527,5 5492.5 5489'5 5470.5 408, 5385.5 5375,5 535~,0 10-FEB-~.995 11:42 PAGE: :IS Tame Verification Listing 'chlumberger AlasKa ComputlnQ Center IO-FEB-1995 11:42 5313 5300 5299 5290 5271 5261 5236 5228 5223 5180 5t54 5t18 5t05 50?7 5076 5065 5044 5016 5009 4990 495~ 4949 4923 4918 487{ 4869 4847 4829 4827 4820 4779 4769 4758 473~ 47 47 4701 4699 4677 4647 4552 0 4506 4503 100 0 0 5 0 5 0 5 0 5 0 5 0 5 0 0 5 5 0 5 0 0 0 0 0 0 5 0 5 5 5 5 0 5 ,5 0 0 5301,5 5291,0 5~60,5 5227.0 5182,0 5105.5 5079.0 5063.5 5045.0 501t.5 4991.5 4956.5 495!.0 4922'0 4870.5 4848,0 4830,5 4820,5 4780.5 4768.0 4757.5 47~9.0 47 4718.0 4704.0 4679.5 4650.0 4554.0 4~24.0 5316.0 5301.5 5272.5 5239,0 5224,5 5156,0 5121,0 5079.0 5019.0 4991.5 4920.0 4B71.0 4829,5 4720.5 4702.0 4520.5 4508,0 4504,0 102,0 101.0 THE INFORMATION PERTAINING TO THE OPEN HOLE GR SUCH AS RUN NU~BE~ PASS NUNBER, LOGGING DATE AND LOGGING_ COMPANY ~S NOT PROVIDED WITH THE-TAPE SUPPLIED BY THE CLIENT. THE OPEN HOLE GR HAS BEEN CLIPPED SO THAT THE DATA WOULD FIT ON A FLOPPY DISK. THE DEPTH CORRECTIONS S}{OWN ABOVE REFLECT CASED. HOLE' GR PAGE: IS Tape Verification I, isting chlumherger AlasKa ComputtnO Center lO-FgB-!9g5 11:42 TO OPEN HOI, E GR AND CASED MOLE SIGN TO OPEN i~DLE ALL OTHER TDTP CURVES WERE CARRIED WITH THE SIGH SHIFTS $ PAGE: VERSION ~ OO1CO1 MAX R~C SIZE ) !0~4 F~LK TYPE : LO LAST FILE FIL~ NUMBERI ! Depth shifted and clipued curves for each pass in separate files, P~S$ NUMBER~ ! D~PTH INCREMENT: 0.5000 F~L~ SUMMARY' LONG TOOL CODE START DEPTH STOP DEPTH ~RCH 6647,0 4500.0 TDTP 6661,0 4500,0 CURVE'SHIFT DATA - PASS TO PASS(MEASURED DEPTH) BASELINE CURVE FOR SHIFTS' 5DW~ CURVE CODE: '''''''-''EQUIVALENT UNSHIFTED DEPTH'-'-'-'-'- BASELINE'DEPTH ~EMARKS: TM!$ FILE CONTAINS PASS {1 OF THE, TDTP, NO PASS TO PASS · SHIFTS wERE APPI~IED TO T}~I$ DATA,. $ LIS FORMAT DATA IS Tape verification Listing chlumberger AlasKa ComputlnO Center lO-FEB-1995 11:42 ** ~RTA FORMAT SPECIFICATXON RECORD ** ** MET TYPE - 64EB ** .......TYPE '''~'''''''''''2C3~'CODE ! 66 2 66 0 3 73 92 4 66 5 66 6 73 7 65 8 68 0 5 9 65 li 66 12 68 13 66 0 14 65 ~T i5 66 68 16 66 ! 0 66 0 .** SET TYPE - CNAN ** .....................................................,, ..... ......-..-...,,---,,--..,--- NaMF SERV UNIT SERVICE APl AP% APl APT FILM MB NUMB SIZE RE OCES ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 500610 O0 000 O0 0 ! 1 I 4 68 0000000000 STG~ TDTP CU 500610 O0 000 O0 0 1 1 I 4 68 0000000000 TPHI TDTP PU-$ 500610 O0 000 O0 0 I I ! 4 68 0000000000 SBH~ TDTP CU 500610 ' O0 000 O0 0 1 ~ 1 4 68 0000000000 S~HN TDTP CU 500610 O0 000 O0 0 t I 1 4 68 0000000000 STGC TDTP Ct) 500610 O0 000 O0 0 1 1 1 4 68 0000000000 STB~ TDTP CU 500610 O0 000 O0 0 I ! 1 4 68 0000000000 T~AT TDTP 5006'10 O0 000 O0 0 1 1 1 4 68 0000000000 SDS! TDTP :CU 500610 O0 000 O0 0 i I I 4 68 0000000000 BRCK TDTP CPS 500610 O0 000 O0 0 1 I 1 4 68 0000000000 FBAC TDTP ' CPS 500610 O0 000 O0 0 1 1 1 4 68 0000000000 TCAN TDTP CPS 500610 O0 000 O0 0 I I 1 ~ 68 0000000000 TCAF TDTP. CPS 500610 O0 000 o0 0 I I I 4 68 o000000000 TCND TDTP CPS 500610 O0 000 O0 0 I I I 4 68 0000000000 TCFO TDTP CPS 500610 O0 000 O0 0 I 1 I 4 68 0000000000 TSC~ TDTP CPS 500610 O0 000 O0 0 i I 1 4 68 0000000000 TSCF TDTP CPS 5006'10 O0 000 O0 0 I I 1 4 68 0000000000 I~MD TDTP CPS 500610 O0 000 O0 0 1 1 i 4 68 0000000000 INFD TDTP CPS 500610 O0 000 O0 0 1 ! I 4 68 0000000000 GPCW TDTP GAPI 500610 O0 000 O0 0 I I 1 4 68 0000000000 TFN$ TDTP' LB 500610 O0 000 O0 0 I I ! 4 68 0000000000 cc~, ,.~,~, v ~oo~o oo ooo oo o ~ ~ , ~ ~8 oooooooooo ~, ,c~. ~,~ soo~,~o oo ooo oo o ~ .~ ~. ~ ~8 oooooooooo e(m.e(~mme)y/~y/~eee~m~memmmmememmm~R~em~emmm$$mm~eommm~Nmmemmmm.' mmme~e?mmmsm~memmmm.~ memmmmamammmm mm imm PAGE: ,IS ?aDe.¥erlflcat!on LiSting ;chlumberger AlasKa Computing Center DEPT, 6670.000 SIGE,TDTP $SHN.TDTP '999,250 SIGC,TDTP SD~?,TDTP :999'250 ~ACK.TDTP TCAF.TDTP -999.250 TCND.TDTP T$C~,TDTP ~999,250 INNO.TDTP T~N$.TDTP 999.250 CCL.TDTP DFPT, 4460.000 $IGM.TDTP SBHN.TDTP -999.250 SIOC.TDTP SDST,TDTP -9~9,250 BACK,TDTP TCAF.TDTP -999.250 TCND.TDTP TSCF.TDTP -999,250 INND.TDTP TFN$.TDTP -999.250 CCL.TDTP ** END OF D~?A ** IO-F~B-lgg5 11:42 -999.250 99 .250 -999,250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 TPHI.TDTP SIBH.TDTP FBAC.TDTP TCFD.TOTP INFD.TDTP GR.BCS TPHI.TDTP SIBH.TDTP FBAC.TDTP TCFD.TDTP INFD.TDTP GR,BC$ -999 250 -999 250 -999 250 -999 250 -999 ~50 82.290 -999.250 -999.250 -999.250 -999.250 -999.250 44.944 SBHF.TDTP T~AT.TDTP TCAN.TDTP TSCN.TDTP GRCH.TDTP SBHF.TDTP TRAT.TDTP TCAN.TDTP TSCN.TOTP GRCH.TDTP PAGE= -999,250 -999,250 -999.250 -999,250 -999.250 -999.250 -999,250 -999.250 -999,250 -999.250 **** FILM TRAILER FILE NAME : EDIT ,001 SERVICE : FLIC VERSION ~ 001C0! DATF ~ 95/0~/10 ~X REC SiZe: : 1024 FILE TYPE : LO LAST 'FILE **** F!bE HEADER **** FIL~ NAME ~ EDIT ,002 SERVICE ~ F4IC V~RSION .: O0!C~ ~A× REC $~Z£ ~ ~094 FIL~ TYP~ ) LO LAST FiLE : FIL~ HEADER FIL~ NUMBER: Depth shifted PASS NUMBER: DEPTH INCREMENT: FIL~ SUMMARY LDWG TOO5 CODE GRCM TDTP 2 and clipped curves - 0,5000 START DEPTH 6647,0 6661,0 for each pass STOP DEPTH 4500.0 4500,0 in separate files. lis Tape verification Listing ichlumeerger Alaska Computing Center PAGE~ CURVE FOR SHIFTS CURVE COPE: ~RCH NUMBER: 6657 6653 664~ 66~1 6637 6633 6629 6625 6621 66!6 66{3 66{~ 6609 660~ 6605 6601 6597 65~g 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 65855 65 656? 656 6560' 6557,5 6556.5 6553.5 6552 5 654q 5 6545 5 654! 5 6540 5 6528 5 6525 5 652~;5 6521,5 6517,5 6513.5 66I~.0 66!2.5. 6609.0 656i.5 655'/.0 6541,5 6538.0 6529.0 6525.5 OUIVALENT DTP 665g.5 6655.0 6650.5 6643.0 6639°0 6634.5 66 0 662~,5 6614,S 6611,0 6606 5 6603 0 659~ 5 6590 5 6587 0 6582 5 657~ 5 6575 0 6570 5 65~,~ 5 6559.5 6555,5 6550.0 6547,5 6543,0 6538,0 6533.0 6529,5 6526.0 517,5514,5 DEPTH''"' .... '' ,IS TaPe Verification 6isttnn ;chlumberger Alaska Computing Center 10-FgB-1995 11:42 PAGE: 6509.5 6505 5 6501 5 6489 5 6485 5 6481 5 6477 5 6473 5 6469 5 6460 5 6456 5 6445 5 6433 5 6432 5 642 5 6425 5 6424 5 64~ 5 6420 5 6405 5 640! 5 6397 5 6388 5 6385 $ 6384 5 6380 5 6377 5 63765 6372:5 6369,5 6364 5 63 5 635? 5 6353 5 6349 5 6345 5 6344 5 634! 5 6340 5 6337 5 6336 5 6329 5 6325 5 632! 5 6317 5 6313 5 6312 5 6309 5 6308 5: 6305 5 6461,5 6458.0 6434.0 6429.5 6426,0 6421.5 6389.5 6386,0 6382,0 6377.5 6374.0 6370,0 6365,5 6362,0 6346,0 6341,5 633B,0 63<14,0 6310,5 6510 0 6507 0 6503 5 6491 5 6487 0 6483 0 6478 0 6475 0 6471,0 6447,5 6435.5 6430,5 6426,5 6423,0 6401,0 640 ,5 6399,5 6387.5 6383.0 6378,5 6370,5 6367,0 6362,5 6355 635o. 6345'5 634~,5 6339.0 633!,0 6328,0 6323,0 6319'5 6315;0 6311,0 6306,5 ,iS TaPe Verification Listing ~cblumberger Alaska ComPuting Center lO-FEB-1995 1t~42 PAGE~ 10 6304 6301 6297 6296 6293 6289 6285 628! 6277 6272 6269 6268 6265 6264 6261 6260 6257 6256 625~ 624. 6~45 6241 6237 6233 6229 62 6196 6193 6!92 6189 618~ 618 6177 6176 6t73 .69 6!65 6164 6t6! 6160 6157 6156 6153 6149 6145 6t44 614~ 6140 6t37 6133 6306,0 6302.0 6298.5 6274.5 6270.0 6266,0 6262,5 6258,0 6~98,0 6193,5 6!81.5 6177,0 6173,5 6!65,5 616 . o 6t50,5 6t46,5 6!41,5 6302.0 6297.5 629 0 6286,0 6282,5 6279,0 6271,0 6267,5 6262,5 6259,5 6254,5 6251.0 6247'0 624~,5 6239,0 6235,5 6230,0 6226~0 6223'5 6219,0 6199;0 6194.5 6191.0 6183,0 6i78.5 6175.5 6171,5 6166.5 6t6~.0 6~58.5 6154 ~ 6150~ 6146,5 6142.0 6138 0 6134:5 ils Ta~e Verification Listin~ ~chlumberger AlasKa Computinq Center 10-FEB-lg95 11:42 PAGE~ 11 6t29,5 6125,5 6124 5 6120 5 6105 5 6101 5 6099 $ 6093 5 6089 5 6085 5 6081 5 6099 5 6073 5 606~ ~ 6065 5 6061 5 6059 ~ 605 5 6 6049 5 6048.5 6045.5 6041 5 6037 5 6033 5 6032 5 6029 5 6028 5 6025 5 602~ 5 60 5 6! 5 60 2 5 60~9 5 600~ 5 600 5 6000 5 5997 5 5996 5 599~ 5 598. 5 5985 5 598! 5 5977 5 5~7~ ~ 5969 5965 594g 6125.5 6122.0 6054.0 6049.5 6033.5 6030.0 6018.0 6013.5 6 O01. 5998 6130.0 6!27.0 6122.5 6114.5 6111.5 6107.0 6102.5 6100.5 6096.0 609!.5 6088.5 6083.5 607~.0 6074.5 6070 0 6065:5 606~.5 6058.5 6055.0 6052.5 6048.0 6043.0 039.0 034.5 6030.0 6026.0 6023 .~ 6018: 6014.5 6011,0 6006.5 6001.5 5999.5 5995,0 5990.0 5987,0 5983,0 5979.5 5976'0 5970;5' 5967 5 5963 5 5959 0 5955 o 5950 0 ;IS TaPe Veri~icatlo~ Listln~ ;c~lu~erger.~la$~a C.o~utin. Center lO-FEB-1995 11:42 PAGEI 12 5945 5 5941. 5 5937 5 5933 5 5929 5925 5 5921 5 591'7 5916 5 5913 5 5909 5 5905 5 5901 5 5897 5 5893 5 5889 5 88~ 5 5877 5 5873 5872 5 5869 5 5868 5 5864 5860 5~41 584~ 5 593 5 5836 5833 583~ 5 5829'5 5825~5 58t3;5 5809 5 5805 5804 5793 5 5~89 · 5785 5 578~ 5 578 577~ 5 5776 5764 5~61 5918,0 5913,5 5873,5 5870.5 5866,0 586 t .5 5858,0 5842,0 5838,5 5834.0 58!0.0 5805,5 5781,5 5778,0 5766.0 5946 5 5943:0 5938.5 5934.5 5931,0 5928,0 5924.O 5919,0 5915,0 590 0 5902 0 5899 5 5894,5 5890.5 5885 5 587~,0 587.,5 5871.0 5859.0 5854,5 5842.5 5839,0 5835,0 81~,0 ~81 ,0 5806,5 5802,5 5799,5 5794.5 5,787,5 5783,0 5780,0 577~,5 576 5763,0 ,IS Taoe Verification Listinc ;cblumber~er Ala$~ CO~puti~ Center IO-FEB-1995 i1:42 PAGE: 13 5760 75~ 5753 5752 5749 5745 5741 5725 5721 5717 5713 5709 5705 570! 5692 5684 5681 5680 5676 5672 5669 5665 5664 5661 5660 56 5653 5652 5649 5645 564! 5629 5625 5621 562O 5616 5605 5601 5597 5596 559~ 59 ~589 55 5580 5577 5576 5 5568 5564 5560 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 $ 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5761.5 5758.0 5753,5 5693.5 5686.5 5682.0 5678.5 5674,0 5666,0 5661,5 5658.o 5653.5 562~.5 561 .0 5598.0 5593.5 5 5 !, :5 557~,0 5570.0 565.55 556 ~ · 0 5759, 5755. 5 0 57505 57465 57430 5727 0 57235 57190 57150 57115 570~ 0 5702 0 5683,5 5671,0 5667,0 5661,0 5659.0 5654.0 0,5 564.0 562 5 562 0 560~ 5598 5594.0 5590,5 5586,0 5582,0 5570,0 5~75,5 5 71,0 ,IS Tape Verification Listin~ ;chlumberqer AlasKa Computin. Center lO-F~B.~,995 11:42 PAGE= 14 5557 5 5556 5 555] 5 5552 5 5549 5 5545 5 5544 5 5541 5 5540 5 5537 5 5536 5 5533 5 5529 5 5525,5 552!,5 5517.5 5516.5 5513,5 5512.5 5509.5 5508 5 5505 5 5504 5 550O 5 5497 5 5496 5 5493 5 5489 5 5485 5 5481 5 5477 5 5476 5 5473 5 5472 5 5469 5468 5465 5 5464 5 546~ 5 545 5 54 3 5 54~9 5 5445 5 5441 5 5437 5 5436 5 5433 5 5432 5 5429 5 5428 5 5425 5 5424 5 5421 5 15420 5 5417 5 5558.0 5554.5 5546.5 5540.5 5538.0 55t8,0 5513,5 5510.0 5505,5 5501,5 5498,0 5478.0 5473.5 5469.5 5466,0 5438.0 5434,5 5430,0 5426.5 5422,0 5559.0 5554.0 5549.5 5546,0 5542,0 5537.5 5534.5 5531.0 5526.0 5521.5 5518.0 5513,5 5509.5 5506.0 5498,0 5494 5490 5487 5482 5478 5475.0 5470.5 5466,0 5461 5 5453.5 5450,5 5446'~ 5439 5434.5 5431.0 5427.0 542].5 5419.0 ,IS Tape Verification Listino ;chlumberger Alaska Computin~ Center 5416,5 5413.5 540g,5 5417.5 5414.5 541~.0 lO-FEB-1995 11:42 PAGE: 15 DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE TYPE R~P~ CODE VALUE 1 66 0 2 66 0 3 73 88 4 66 1 5 66 ? 65 8 6~ 0 5 6s 11 66 11 12 68 13 66 0 14 65 FT 12 66 68 I6 66 1 0 66 m~)'..~mN~m~mmmmmmmmmmmem~mmmmmmmmmm~m~mm NAMK S~RV UNIT SERVICE API ~PI APi ID ORDER ~ LOG TYPE CLASS D~PT FT K00610 O0 000 O0 SIGM TDTP C(.] 5006~0 00 000 O0 TPH! TDTP PU-$ 5006~0 O0 000 00 8BHF TDTP CU 5006~0 O0 000 O0 SFMN TDTP CU 5006~0 O0 000 O0 $iGC TDTP CU 5006~0 O0 000 O0 8IBM TDTP CU 5006~0 O0 000 O0 TRAT TDTP 200610 O0 000 O0 SD$I TDTP CU 200610 O0 000 O0 BACK TDTP CPS 5006~0 O0 000 O0 FBAC TDTP CPS 5006~0 O0 000 O0 TCAM TDTP iCP$ 500610 00 000 O0 T~AF TDTP CPS 5006~0 O0 000 00 TCN~ TDTP CP$ 5006!0 00 000 O0 TCFD TDTP C~M 500610 O0 000 O0 T$CM TDTP CPS 5006!0 00 000 O0 T$CF TDTP CPS 5006~0 O0 000 00 IMND TDTP CPS 200610 O0 000 O0 INFD TDTP C~$ 5006~0 00 000 O0 ~PI FILE NUMB NUMB $IZ[ REPR PROCESS MOD MU~B 8A~P, ELEM CODE (HEX) ~ I ! 4 68 0000000000 2 1 i 4 68 0000000000 2 1 1 4 6~ 0000000000 2 I i 4 6~ 0000000000 2 1 i 4 68 0000000000 2 1 I 4 68 0000000000 ~ 1 1 4 68 0000000000 2 :1 I 4 68 0000000000 2 t i 4 68 0000000000 2 I 1 4 68 0000000000 2 I 1 4 68 0000000000 2 1 I 4 6~ 0000000000 ~ I I 4 68 0000000000 2 1 1 4 68 0000000000 2 1 i 4 68 0000000000 2 I 1 4 68 0000000000 2 ! I 4 68 0000000000 2 I I 4 68 0000000000 2 1 1 4 6~ 0000000000 ,18 Tape Verification Listino ~chlumbergerAlaska ComputinO Center lO-FEB-1995 11{42 16 s .v 2;i ;'"" ' ~mw~mmm~~wm~m~m~~mm~m~m~~~~m~~m~~mmmmm~~w~m~mmm GRCH TDTP GAPI 500610 OO 000 O0 0 2 I ! 4 68 0000000000 TFN$ TDTP LB 500610 O0 000 O0 0 2 1 I 4 68 O0000000OO CCL TDTP V 500610 O0 000 O0 0 2 1 I 4 68 0000000000 · DEPT SBH~]~DTP SDSY.TDTP TCAF,TDTP TSCF,TDTP TFNS,TDTP D~PT, SRHN,TDTP SDSYeTDTP TCAF,TDTP TSCF,TDTP TENS,TDTP 6661,000 SIG~,TDTP 29.0~ TP~I,TDTP 54.152 SBHF,TDTP 43o443 SIGC.TDTP ~.9 $IRH.TDTD 43.443 TRAToTDTP 0.963 BACK.TDTP 1~7.986 FBAC.TDTP 42.~ TCAN.TDTP 80,000 TCND,TDTD 21152,906 TCFD,TDTP 5359 ~ T$CN.TDTP ~! O)l IN~ IDYP 1820.250 INFD.YDTP 352:. Sg GRCH.TDTP o.ooo 4500,000 SIGM.TDTP 27 692 TPHI,TD?P 45'.183 'SBHF,TDTP 41,2~2 SIGC.,TDTP ~]971 SIBH,TDTP 41,282 TRAT,TDTP 0,898 BACK,TDTP 167,365 FBAC,TDTP 29,621- TCAN,TDTP 2026.6q9 INND,TDYP I~45,950 INFD"TD{P 2 2 GRCR.TDTP 710,000 CCb,TDTP 0.000 END OF DATA 34.311 2,057 33274,750 3788,250 -999,250 32.586 2,100 31051.305 6183,369 36.438 **** FY'L~ TRAILER FILE NAME : EDIT ,002 SERVICE : FLYC VERSION ~ 00IC01 D,~TF { 95/02/10 EAX EEC SIZE ~: FILE TYPE { LO LAST FiLE **** FIbE HEADER FiLE NAME ~ EDIT .003 SERVICE : FbIC V~RSION : 001C01 DAT~ ~ 95/02/~0 MaX REC SIZE : ~024 FILE TYP£ : LO LAST FILE F!LF HEADER Ft5~ NUMBER: ~3 Tape Yerlfication Listing ;chlumberger AlasKa CompUtln~ Center 10-FE8-1995 11:42 PAGE: 17 EDITED CURVES Depth shifted and clipped curves for each pass in separate files, 0,5000 PASS NUMBER; DEPTH INCREMENT: # FIL~ SUMMARY LDWG TOOb CODE ~RCH TDTP START DEPTH 6647,0 6662.0 SIOP DEPTH 5788.0 5788.0 # CURVE SHIFT DATA - PASS TO PASS(MEASUrED DEPTH) BASELINE CURVE FOR SHIFTS LDWG CURVE CODE: GRCH P~SS NUMBER: 1 6657 6653 6645 6644 6641 6640 6637 66)3 6629 662~ 66 66O9 6608 6605 660~~ 6600 6~96 6593 6592 6589 658~ 6585 6584 658~- 6580 657? 6573 6569 6565 656! 6557 6553 6549 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 ----------EQUIVALENT UNSHIFTED DEPTH .... ------ GRCH TDTP. 88888.0 888 6658.0 6654,5 6645,5 6644,5 664~,0 664!.0 66~6..0 6633.5 6628,5 6629,0 66.14,.0 6612.0 660~,~ 6607,0 660~.0 6600-5 6596'0 6594.0 6589,5 65~S.5 6585,0 6584,0 6581,5- 6580.5 573.0 565'5 561.0 6555'0 6549,5 ,I$ Ta e Verlflcatio, Listln g~r A1as~a Comput!n.g Ce ter 10-FEB-19g5 11:42 PAGE: 6548 6545 6544 6541 6537 6533 6532 6529 6528 6525 652i 6520 6517 6516 651~ 651 6509 6504 6501 6497 6496 6492 6489 6488 6485 648~ 647 647] 46 646~ 644 6445 6444 6441 6440 6437 6436 643] 6432 64 6424 6420 6413 6409 6408 6405 6404 6401 6397 6393 5 6548.5 5 5 6545.0 5 5 5 6533,0 5 5 6528.5 5 5 6520,5 6515.5 6512.5 6508.5 6504,0 6496,0 649~.5 6488.0 6468,0 6464'5 6444,5 :4o.o 6436,5 6432,0 6428,5 6424,5 6420.0 6408,0 6404,5 6545,5 6541.0 6537 0 6532:5 6529,0 6525.0 6521,5 6517,0 6513.0 6520.0 6505.0 6502.0 6497,5 6489,5 486 0 481 5 6477 5 6474 0 6469 5 44~,5 ~44 .0 644.1,5 6437,5 6434,:0 6429,5 64~35 6:4 8:5 6405,5 402.0 .398,0 6393,5 6390,0 mis Tape Verification Llstine ;chlumberger Alaska Computing Center lO-FEB-1995 11:42 PAGE: 19 6381 6377 6373 6369 6365 6361 635? 6353 6349 6345 6341 6340 6336 6332 6325 6321 6320 6317 6316 6313 6309 6305 6304 6301 63 6293 629~ 6288 6284 626t 6277 6273 6269 6 56 6252 6249 6245 6241, 6233 225 ~224 62i3 6t97 6193 6192 618~ 618 6t8i 5 5 5 5 5 5 5 5 5 5 5 5 6340.5 5 6337.0 5 6332.5 5 5 6320,5 5 5 6317.0 5 5 5 6305,0 6300 5 6296~5 5 6293,0 5 628~ 0 s 628 : s 5' 5 ,5 5 625~,5 5 625 . . 0 5 5 5 5 5 5 6192.5 6382 0 6376 5 6374 0 6369 5 6365 0 6360 5 6357 0 6353 5 6348 5 6345 5 6341 0 325.0 321,5 6317,5 6313,0 6309,0 6304,5 6300.0 6293,5 6281 5 6277 0 6274 0 6269 5 6~65 5 6261 0 6257 5 6249 6]47 6 41 6233 6229 6225 622t.0 6217,5 62i3,0 6197,0 619~; 5 6185,5 6181.0 Tape Verification List! ~ ~chlumberger AlasKa Computt~ Center lO'FEB'1995 11;42 2O 6t68 5 6164 5 6156 5 6152 5 6145 5 6141 5 6137 5 6133 5 6129 5 6125 5 6121 5 6117 5 6113 5 611~ 5 6109 5 6108 5 6104 5 6101 5 6097 5 6093 5 6089 5 6081 5 607u 5 6073 $ 6069 5 6065 ~ 6061 6057 5 6053 5 049 5 045 5 6041 5 6040.5 6037 5 6029 5 6025 5 6O 60 a s 6009 5 6005 5 600~ 5 600 5 600~ 5 599. 5 5993 5 59~ , '5976~5 5972'5 5969,.5 5965~5 6168 0 6164~$ 6156,5 6152.0 6!12.0 6104,0 6040,0 6036.5 6004,5 6000,0 5976,0 5972,5 6145,0 6140,5 6137,5 6133.5 6130,0 6125,5 6121,5 6118.0 6113.5 6109.0 6101,0 6097,5 6093.0 6089,0 6082,5 6077,0 6073,0 6068,5 6063,5 6060 5 6056 5 6053 0 6049 5 6045 5 6041.0 603B.0 6029 6024 600Q oo :g 6001,0 5997 5 5993 0 '5985 0 5981. 5 5977 0 5969,0 5965,5 Tame Veriflcetion Listing ~chIUmberger AlasKa ¢omputinQ Center lo-.FEB-lgg5 11:42 PAGE= 21 5961 5 5957 5 5953 5 5949 5 5945 5 5941 5 5937 5 5933 5 5928 5 5925 5 5924 5 5921 5 5920 5 591'/ 5 5916 5 5913 5 5912 5 5909 5 590! 5 5897 5 5893 5 5889 5 5885 5 587'/ 5 5873 5 5849 5 5848 5 5845 5 5844 5 5841 5 5840 5 583'7 5 5836 5 5832 5 5829 5 5821 5 51~17 5 5813 5 5~Oq 5 5805 5 5801 5 .100 0 5928,5 5924.0 5920,0 5916,5 5912.0 5848.0 5844.5 5840,0 5832'0 99,5 5961 0 5957:5 5953,5 5949.0 5945.0 5940.5 5936,5 5933,0 5925,0 5920,5 5917.0 5913,0 5908 5 5900 5 5897 5 5993 5 5~89 0 5884 5 5876 5 5873 0 5849 0 5844,5 5842,0 5837"0 5829 0 5821 5 5813:5 5a09 0 5804 5 5~01, 0 99 5 ~E~ARKSl TH:IS FILE CONTAINS BORAX PASS ~1 OF THE :TDTP. THE DEPTH CORRECTIONS SHOWN ABOVE:REFLECT BORAX PASS ~1GRCH TO BASE PASS #1GRCH AND BORAX P&SS #i SIGH TO BASE PASS #! $I~M,: AbL OTHER TDTP CURVES WERE CARRIED WITH TH~ SIG~ SHIFTS, $ [,TS FORNAT DATA IS ?aue Verification bistinq chlumberger AlasKa Computing Center lO-FEB-1995 11:42 22 DATA FORMAT SPECIFICATION R~CORD ** SET TYPE - 64EB ** TYPE REPR CODE V~LiIE 66 0 66 0 3 73 4 66 1 5 66 6 73 7 65 8 68 0 5 11 66 12 68 13 66 0 15 66 68 16 66 0 66 1 ** SET TYPE - CHAN ** NAM~ SERV UNIT SERVICE APl API AP1 AP! FILE NUMB NUMB SIZE REPR P~OCESM ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DFP? FT 500610 O0 000 O0 0 3 1 i 4 68 0000000000 $IG~ TDTP CU 500610 O0 000 O0 0 3 I ! 4 68 0000000000 TPHI TDTP PU-$ 500610 O0 000 O0 0 3 ! 1 4 6~ 0000000000 SBMF TDTP CU 509610 OO 000 O0 0 3 I I 4 68 0000000000 $~HN TDTP CU 500610 O0 000 O0 0 3 1 I 4 68 0000000000 $~GC TDTP CU ~00610 O0 000 O0 0 3 I 1 4 68 0000000000 $IB~ TDTP CU 500610 O0 000 O0 0 3 1 I 4 68 0000000000 TRAT TDTP 500610 O0 000 O0 0 3 I I 4 68 0000000000 SO$I TDTP CU ~00610 O0 000 O0 0 3 I I 4 68 0000000000 BACK TDTP CPS 5006.10 O0 000 O0 0 3 1 I 4 68 0000000000 FBAC TDTP CPS 500610 O0 000 O0 0 3 ! I 4 68 0000000000 TCAN TDTP CPS 500610 O0 000 O0 0 3 1 I 4 68 0000000000 TCAF TDTP CPS 500610 O0 000 O0 0 ] I i 4 68 0000000000 TCMD TDTP CPS 500610 O0 000 O0 0 ] 1 I 4 68 0000000000 TCFD TDTP CPS ~00610 O0 OOO O0 0 3 I I 4 68 0000000000 TSCN TDTP CPS 500610 00 000 00 0 ~ 1 I 4 68 0000000000 TSCF TDTP CPS 500610 O0 000 O0 0 3 1 I 4 68 0000000000 INN~ TDTP CPS 500610 O0 000 O0 0 3 1 1 4 68 0000000000 INFD TDTP CPS 500610 O0 000 O0 0 ] t 1 4 68 0000000000 G~CH TDTP GA. PI 500610 O0 000 O0 0 I ! 4 68 0000000000 T~NS TDTP LB 500610 O0 000 O0 0 I 1 4 68 0000000000 CCL TDTP V 500610 O0 000 O0 0 3 1 I 4 68 0000000000 TaPe Verification Listing ;¢hlomberger AIa$1ca Computln,cj Center D£PT, SBHN,TDTP $~ST,TDTP TCAF,TDTP T$CF.TDTP TFN~.TDTP 6661,000 46.845 0,874 8495,250 1085,236 8!1,578 $IGM.TDTP SIGC,TDTP BACK.TDTP TCN~:TDTP ~NN TDTP CC5.TDTP DEPT. 5785,000 SIGM,TDTP SRHN.TDTP 91.445 SIGC.,TDTP SDSI.TDTP 0.671 BACK.T~TP TCAr TDTP 4138.245 TCND,TDTP TSCF:TDTP 8~5,160 INNO.~D~P TMNS,TDTP 755,000 CCb. TDTP ** END OF DATA ** lO-FEB-1995 1I:42 1~44~,00 T DT 5051'859 TSCN.TDT .~83 .438 INFD.TDTP ~97:!68 G~C~oTDTP 0.000 20.547 TPMI.TDTP 0,0~7 SIBH.TDTP 1~.916 FBAC.TDTP 9935.877 TCFD.TDTP 2245,588 INFD.TDTP 0.000 51 055 SBHF,TDTP 115:995 T~AT.TDTP 27.271 TCAN.TDTP 2957.960 TSCN,TDTP 409.~55 G~CM.TDTP PAGE: 23 43.598 2.062 29274.000 3618.313 -999,250 70.631 1.910 11225.313 2238.311 38,844 **** F~LE TRAILER **** F~LE NAME : EDIT ,003 SERVICE : FbIC V~RSION : O0!COI D~T~ ~ 95/02/10 ~AX RgC $~ZE ~ ~024 FIL~ TYPE : LO LRST FILE **** F~LE HEADER **** :FILE NAME i ~DIT ,004 ERVICE : FbIC ~RSZON : O01CO! DITE : 95/02/10 ~AX REC $IZ~ : t024 F~LE TYPE ! LO LAST'FILE FILM HEADER FIL£ NUMBERm 4 EDITED CURVES Depth shlfted and clipped curves for each pass in separate files. P~Ss"NU~BE~:~ , 4 .... DEPTH INC~EMENT: 0,5000 F~LF SUMMARY LDWG TOOL CODE START DEPTH STOP DEPTH GRCH 663~ 0 5658,0 TDTP 665~:0 5658,0 ,rS ?a~e Verification Listinq .chlumberqer AlasKe Computinc~ Center lO-FEB-1995 11:42 PAGE: 24 $ # SHIFT BASELINE ASEbINE DEPTH 8888,0 6645,5 6633,5 6629,5 661 5 6613.5 6609,5 6605,5 6604'5 66015 6600 5 6597 5 6593 5 6599 5 6588 5 6585 ,5 6584 5 6581 5 6580 5 6577 5 65735 6569 5 65 5 6553 5 6549 5 654~ 5 6545 5 654! 5 6537 5 6533 5 6529 5 6524 5 5~0 5 65 ~ 5 65 6 6508 5 6505 5 6504 5 6501 5 DATA - PASS TO PASSCMEASUR~D DEPTH) CURVE FOR SHIFTS CURVE CODEI GRCH NUMBER: 1 ----------EOUIVAbEN~ UNSHIFTED G~CH TDTP 6601.5 6598.0 6586.0 6581,5 6578.0 6546.0 6526,5 6522,0 6517,5 6512,5 6501.0 6642'5 6630,5 6626.0 6621.5 6613.5 6610.0 6606.0 6603,0 6598.5 6595,0 6590.5 6586,5 6582,0 6578.5 6575.5 6571.5 6566'5 6558'5 6556"0 6546 6543,5 6539 ' 0 653~,0 653~.'0 6526 ;5 6518,5 6515.0 65 6502,0 6498.0 DEPTH------ .... ,IS Tame Verification Listing ;chlumberger AlasKa Computing Center lOoFEBo~995 11:42 25 6500 5 6497 5 6481 5 6477 5 6476 5 6473 5 6472 5 6469 5 6468 5 6465 5 6464 5 646! 5 646O 5 6456 5 6453 5 6452 5 6449 5 6448 5 6445 5 6444 5 6440 5 6436 5 6429 5 6425 5 642~ 5 642 5 6417 5 64X6 5 6409 5 6405 ~ 6404,5 6400"5 6389,5 6]85'5 6380 5 6376 5 6372 5 636~ 5 6357 5 6353 5 32~ 5 317 5 316 ~ 63~:3 5 63~ 5 6309 5 6497.5 6474,5 6470.5 6465.5 646~,0 6458,0 6453.5 6450.0 6446,0 6441.5 6438,0 6433.5 6417,5 6414.0 401,5 398,0 637g.0 6373,5 6370.0 6342.0 6337.5 6 3 3 4. o 6314,0 630g,5 6495.0 6479,0 6474,0 6471,0 6467,0 6461,5 6457.5 6450.0 6446,5 6443.0 642~:0 642 ~ 6419, 64X5,0 6411,,0 6406,5 6403,0 6359.0 6354.5 6350.0 6346.5 6338,5 6335,0 63X9,0 6314.5 63~3.0 6306,5 ,IS Tape Verification Listing ~cblumberger AlasKa Computing Center IO-FEB-19g5 11:42 PAGE: 26 6304 6300 6293 6292 6289 6288 6285 6284 6281 6273 6269 6265 626! 6257 625] 6249 624! 6229 6225 62 6213 6209 6~04 6~00 6~96 6~9~ 6 6}89 6~85 6184 6181 6180 6J77 6176 6172 6~69 6168 6165 6164 6!60 6156 6145 614! 6137 613~ 6! 61-21 6100 6096 609~ 6089 5 5 5 5 5 5 $ 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 $ 6301,5 6298,0 6290.0 6285,0 6282,0 6202.0 6197,5 6194.0 6189.5 6IB5.5 6181,0 6177,0 6169.0 6169,0 57'5 6!54.0 6098.0 6094.5 6090.0 6~90.5 6287.0 6282,5 6279,0 6271.0 6266,5 6263.0 6259 0 6254 5 6250 0 6246 5 6238 5 6~35.5 6231.5 6227,0 6223,0 6219.5 6214.5 6211,0 6206'5 6t86,5 6183.0 6178,5 6175.0 6167,0 6142 5 6138 0 6135 0 6131. 5 6127 5 6123 0 6118 5 6086.5 ~chlum~erger AlasKa Comput nn~. Center lO-FEB-1995 11:42 PAGE: 27 6085 5 6081 5 6077 5 6073 5 6069 5 6065 5 6061 5 6057 5 6056 5 6053 5 6052 5 6049 5 6045 5 6041 5 6037 5 6033 5 6029 5 6025 5 6021.5 6017 5 60 i 5 60~ 5 601. 5 6009 5 6008 5 6005 5 6001 5 5997 5 5993 5 5989 5 508,. 5980 5 5977 5 5976 5 5973 5 5972 5 5969 5 5968 5 '5965,5 5964,5 5961,5 5957.5 5953 5 5949 5 9455 94I 5 5037 5 59 5 59 59015 5897 5 5896 5 6054,0 6049,5 6013,5 6009,0 6005.5 5981.5 5978,0 5974,0 5969,5 5965,5 5962,0 5894.0 608~, 607 6070. 6066. 6063, 6058, 6054, 6050,5 6048,0 6043,5 6039.0 6034,0 6031.5 6026,5 6022.0 6019.0 6014,5 6010.0 6006,5 6002 0 599810 5995 0 59905 5985,5 5082,5 5974, 5971. 5968, 5963, 959 955 5950 5946 5942 5938 5934 5922 5917 5~8 5894 0 0 5 5 5 0 5 5 0 ,IS Tape Verification Listing ;chlumberger AlasKa Computfn~ Center IO-FEB-19g5 11:42 PAGE: 28 5893 5889 5885 5884 5881 588O 587? 587~ 586~ 5857 5852 5849 5848 5845 5844 5841 5840 5~37 5833 5829 5825 581. 5813 5909 5805 5796 5792 5785 5784 5781 577? 5773 5769 576! 575? 5753 5748 5745 5744 574! 5740 57 5732 729 57, 5885,5 5882,0 5877.5 5849,5 5846.0 5~42,0 5837.5 5797.5 5793,0 5789,5 5785°5 5782'0 5746,0 5741,5 5738,0 5730,0 5725.0 5890,0 5~86,5 5882,0 5878,0 5873 5 5869 5 5866 5 5854 5 5850 0 5846,5 5841,5 5838,0 5834 0 5830 5 5826 0 5R22 0 5818 5 5814 5 5811. 0 5806 5 5802 0 5798 5 5786.5 5783,0 577~,5 5775°5 5771°0 5766'5 5758'5 5755;0 5750.0 5742,0 5738,5 5730,0 5727.5 572~.5 5719'5 ;chlumberger Alas)<a Com.P~utin Center iO-FEB-1995 11:42 57 5705 5701 5693 5689 5685 5681 tO0 57 5 5703,0 5698,0 5689,5 5686 0 5682.0 5679,0 96,5 97,5 ~EMARKS: THIS FILE CONTAINS BORAX PASS #2 OF THE TDTP. THE DEPTH CORRECTIONS SHOWN ABOVE REFLECT BORAX PASS ~2 GRCH TO B~SF PASS #! GRCH AND BORAX PASS #2 SIGN TO BASE PASS #1 SIGN, ALL OTHEP TDTP CURVES WERE CARRIED WITH THE SIGN SHIFTS, $ his FORMAT DATA PAGE: 29 ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE I 66 0 2 66 0 3 73 88 4 66 5 66 6 73 7 65 8 68 0.5 9 65 FI I! 66 1~ 68 13 66 o 14 65 FT 15 66 68 16 66 I 0 66 ** SET TYPE - CHAN ** m~m~m~m~~mm~mm~mmm~mmmmmmm~mmm~m~m~~~m~~m~m~mmmmm~mm~mmm~mmm~mm~m NAM£ SERV UNIT 8ERV~C~ API API API API FILE NUMB NUmB ~IZE REPR PROCESS ID ORDER # LOG TYPE CLASS NOD NUmB SAMP ELEM CODE (HEX) D~PT FT 500610 O0 000 O0 0 4 I I 4 68 0000000000 SIGN TDTP CU 500610 00 000 O0 0 4 1 I 4 68 0000000000 TPH! TDTP PU-S 500610 O0 000 O0 0 4 ~ I 4 68 0000000000 ,IS TaPe Verification Listing ;chlum~erger Alasl(e Comput!nq Center lO-FEB-1995 11:42 PAGE: 30 mmmm~m~m~m~mmmm~m~mmmmm~mmmm~mmm~~m~mmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmmm NaME SERV UNIT SERVICE API AP1 AP1 API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS HOD NUMB SA~P ELEM CODE CHEX) O0 000 O0 0 4 I I 4 6~ 0000000000 SBHF TDTP CI! 500610 S~HN TDTP CU 500610 O0 000 O0 0 4 1 I 4 68 0000000000 $~GC TDTP CU 500610 O0 000 O0 0 4 1 1 4 68 0000000000 SIBM TDTP CU 500610 O0 000 O0 0 4 1 I 4 68 0000000000 T~AT TDTP 500610 O0 000 O0 0 4 1 1 4 68 0000000000 SDS! TDTP CU 5006~0 O0 000 O0 0 4 1 1 4 68 0000000000 B~CK TDTP CPS 500610 O0 000 O0 0 4 1 I 4 68 0000000000 FBA~ TDTP CPS 500610 O0 000 O0 0 4 1 1 4 68 0000000000 TCAN TDTP CPS 500610 O0 000 O0 0 4 1 I 4 68 0000000000 TCAF TDTP CPS 500610 O0 000 O0 0 4 1 1 4 68 0000000000 TCND TDTP CPS 500610 O0 000 O0 0 4 ! 1 4 68 0000000000 TCF~ TDTP C~$ ~00610 O0 000 O0 0 4 1 1 4 68 0000000000 TSCN TDTP CPS 500610 O0 000 O0 0 4 1 I 4 68 0000000000 TSCF TDTP CPS 500610 O0 000 O0 0 4 1 1 4 68 0000000000 INND TDTP CPS 500610 O0 000 O0 0 4 1 I 4 68 0000000000 INF~ TDTP CPS 500610 O0 000 O0 0 4 1 1 4 6~ 0000000000 GRCH TDTP GAPI 500610 O0 000 O0 0 4 1 1 4 68 0000000000 T~NS TDTP LB 500610 O0 000 O0 0 4 I 1 4 68 0000000000 CC~ TDTP V. 500610 O0 000 O0 0 4 ~l 1 4 .68 0000000000 ~~m~mmmm~m~mmmmmmmmmm~mmmmm~mmmmm~m~~mmm~m~mmm~mmmmmmm~m~mm~mm~mmm~mmmm~ D£PT 6652,000 $lqM,TD?P .'26 830 TPHI~.w=~DTP 54,453 SBHF,TDTP SBHN:TDTP 43'939 SIGC.TDTP 2 44] 8IBH.TDTD 43'939 TRAT-TDTP 'SDSI.TDTP 1,072 BACK.TDTP 1~ 359 FBAC.TDTP 36.389 :TCAN.TDTP~ TCAF.TDTP 817].000 TCND.TDTP ~0! ~0 TCFD.TDTP 51~.879 ~TSCN.TDTP TSCF-TDTP 1141 063 INND.TDTP 1700 1 INFD.TD~P 3 .453 .GRCH.TDTP TEN$*TDTP 774~89! CCL.TDTD ' 0 060 42,627 2.095 ] . 'B!3 '999.250 D~ TCAF.TDTP T$CF.TDTP TFNS.TDTP 58 000 0'797 ~127 350 64~ 832 73 641 SIGM..TDTP 8IGC TDTP BACK TDTP TCND.TDTP !NND.TDTP CCL.TDTP 21.612 TPHI,TOTP 47.432 SBHF'TDTP ~776.~50 TCFD.~DT~.~ 257~.62S T$CN.TDTP 2!0~;~4~ INFD D?P 37 .0TS GRCH.TDTP 0.000 77.67 6 1'. 799 8314 500 1717i000 36 977 DATA ** ,IS Tepe Verificetion Listinq ;c~lum~erger AlesKa Computlnq Center lO-FEB-1995 11:42 31 VERSION : 001C01 DAT~ : 95/02/10 ~!X REC SIZ£ : 1024 FILE TYPE : LO LAST FILE **** FILE HEADER F!L~ NAME : EDIT ,005 $~RVICE : Fb!C VERSION : O01COI D~TE ~ 95/0~/10 MAX REC SIZ~ ~ FILS TYPE : LO LAST FILE FILE HEADER F!L~ NUMBER: 5 EOITED CURVES DePth Sh~fted a~d'clipoed curves for each pass ~n separate files, PAS~ NUMBER, 5 ' DEPTH INCREMENT: 0,5000 FILE SUNMARY I, DWG TOOL CODE START DEPTH sTOP DEPTH TDTP 6661,0 4500,0 CURVE SHIFT DATA - PASS TO PASS(MEASURED DEPTH) BASELINE CURVE FOR SHIFTS LDW~ CURVE CODE: ~RCH PAS8 NUMBER: 1 BASELINE DEPTH ~8888 0 6648 6644 6636 6632 6628 662? 6624 6620 66~6 6612 ----------EOUIVALEMT UNSHIFTED DEPTH---------- GRCH TDTP 6647,0 6642;0 6634~i0 6629;5 6625,0 6625,0 6614,5 6611.0 ~I$ Tape Verification Listing ;chlumberger AlasKa Computino Center IO-FEB-~995 11:42 PAGE: 32 6608 5 6604 5 6600 5 6592 5 6588 5 6584 5 6560 5 6556 5 6552 5 6548 5 6544 5 6540 5 6536 5 6532 5 65~ 5 652 5 6524 5 651~ 5 5 651 5 651~ 5 6508 5 6507 5 6504 $ 6503 5 6500 5 6499 5 6496 5 6495 5 6492 5 6488 5 6484 ~ 6480 6476 5 6468 5 6444 5 6440 5 6436 5 6432 5 6428 5 6424 5 6420 5 6419 5 6416 5 6415 5 64115 6404 5 6403 5 6400 5 6399 5 6~91 5 687 5 63835 6525,0 6521.5 6517,0 6509,0 6505,5 6501,0 6493,~ 6417,5 641~,0 640.'5 6401,5 6397.0 6389.0 6385,5 6381,0 6606,5 6603,0 6598,5 6590,5 65 65 6551,0 6546,5 6543,0 6538'0 6534,0 6530,5 6526,5 6523,0 65!7,5 6514,0 6509,5 6507,0 6503,0 6498,5 6494,0 6490 0 6486 5 6482 0 64785 6474 0 6466 0 6443 0 6439 0 643~ 0 64 5 64~5 5 6422 0 6418 0 6414,5 6402,5 6398,0 iChlumber_qer lasR Comput n Center lO-FEB-1995 11:42 PAGE= 33 6380 6376 6372 6368 6364 6360 6344 6340 6336 6335 63 6328 6324 632~ 63! 6308 6304 6300 6296 6292 6288 6284 6280 6279 6275 6272 627~ 626 6264 6260 6256 6252 6248 6228 6220 6219 6216 6212 6208 6203 6200 6196 6~92 618~ 61 6176 6175 6172 6168 6164 6I 56 5 5 5 5 5 5 5 5 5 5 6333,0 5 5 6329,5 5 5 5 5 5 5 5 5 5 5 5 5 5 6277.5 5 6274'0 5 6~69.5 5 5 5 5 5 5 5 5 5 5 6217,5 5 5 5 5 6201.0 5 5 5 6181,0 5 6177.~ 5 6173,0 5 5 6378 0 6374 5 6370 5 6366 0 6362 5 6358 0 6342 0 6337 5 6335 0 6329.5 6326 0 6322 5 3!8 0 30O 6301 5 6298 0 6293 0 6289 0 6286,0 6282.0 6278,5 6270.5 6266 6262 6257 6254 6249 6246 242 .230 6226 6218,0 6213.5 621, ~ 0 6t97,5 90;2 6186'0 6174,0 6170,5 6165,5 6J. 6~, ~ 6~1.54, ,Is Tape VeritlCatlon L~stlnq ,chlumberger Alas)<a ComputinO Center lO-FEB-1995 11:42 PAGE: 34 6155 6152 6151 6148 6147 6144 6140 6!36 6135 6128 61 7 6~4 6115 6i1~ 6111 610~ 6107 6104 6100 6099 6096 6095 6092 6091 6088 6084 076 072 606g 6054 6060 605~ 6O5 6048 6044 6040 6036 603 603~ 6031 6028 6024 602) 6020 6019 601~ 60I: 60t2 60~! 6008 6007 6003 5996 5 6153,0 5 6148,5 5 5 6145,0 $ 5 5 5 6133,0 5 ~ 6128,5 5 6!25,0 5 5 6113,0 5 5 6108,5 5 5 6105.0 5 5 6097,0 5 s 5 6089,0 5 5 5 5 5 5 5 6033,0 5 5 6029.5 5 5 5 6021,5 5 5 6017,0 5 5 60!3,0 · 5 6009,5 .5 5 6005.5 5 6001,0 0149,5 6146,0 6J42,0 6!37,0 6134.5 6130,0 6i25,5 612~,0 6110,0 6107.0 6102,0 6098,0 6094,5 6089,5 6086 0 608~ 5 6074 5 6070 0 6066 0 6061 5 6058 0 6054 0 6050 5 6047 0 6042 5 603~ 5 6034 0 6030,5 6026 0 6021:5 6018,0 6013,5 6009,0 6005,5 .5993,5 ,IS Te~e verificeti, o~ Lis~ino ~chlumberger AlasKa ComPuting Center !O-FEB-1995 11:42 PAGE: 35 5992 5991 5988 5987 5984 5983 5980 5976 5972 5971 5968 5967 5964 5960 5956 5952 5948 5944 5932 59~ ~0 5919 591~ 591 590R 5904 5900 5899 5896 5892 5888 588~ 588 5864 5847 5844 5843 5840 5839 5807 5804 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 $ 5 $ 5 $ 5989.0 5985.5 5981.0 5969.0 5965.5 5917.5 5845.0 5841.5 5805.0 5990.0 5985.5 5981.5 5978,5 5974.0 5970,5 5967.0 5962 5 5959 0 5954 0 595O 0 5945 5 5941 5 593~ 0 5933 5 5930 0 59 ,0 5914,0 5907 5898 5893 5 589O 5 5886 5 58 5~62 0 5858 5 584 5841,0 5839,0 58 5818 5 58 0 5806 5 5802,0 IS Tape Verification [,lstfnc chlumberger AlasKa Computfn~ Center IO-FEB-1995 11:42 PAGE: 36 5803 5 5800 5 5796 5 5795 5 5792 5 5791 5 5?$8 5 5784 5 5780 5 5776 5 5775 5 5772 5 5771 5 5768 5 5764 5 5760 ~ 5759 5 5756 5 575~ 5 575 5 575! 5 5747 5 5744 5 5743 5 5740 5 5?32 s 573! 5 5728 5 572? 5 57i~ 5 5684 5 5680 5 567~ 5 567 5 5668 5 5667 5 5664 $ 5663 5 5660 5 5659,5 656;5 ~628,5 624,5 ~620.5 5616;5 5612,5 5608,5 5604,5 559~ 5~00,5 5792,5 5789,0 577~.0 5769.5 5757.5 5753,0 5749,0 5745,5 5741.0 5737,5 5729,5 5725.0 5665,0 5660,5 5657,0 5597.0 579~.0 5794,5 5790,0 5787 0 · 5783,0 5778,5 5775,0 5770,0 5766.5 5762,0 5758.0 5755.0 5750,0 5742 5738 5726 709 5661 5657 '5653 '5650 5634 5630 5626 5621 5618, 56 · 5606, 560~, ,0 .5 5 ~5 ,5 ,0 ,5 ,0 ,5 .5 ,5 5 0 0 5 0 5 0 0 0 5 0 5594, ,IS Tape Yerlflcation Listtno ichlumberger AlasKa Computing Center lO-FEB-1995 11:42 PAGE: 37 5595 5592 5591 5588 5584 5580 5576 5572 5568 5559 5556 5555 5552 5551 5548 5547 5544 554~ 554 5536 553~ 552 5524 5520 55t6 551~ 5507 5503 5500 5499 5496 5495 5492 5491 5488 5475 5472 5471 5468 5464 5460 5456 5444 5440 5432 5428 5424 5423 5419 5416 54 ~ 541 539~ 539i 5593.5 5589,0 5589,0 5586,0 5581,5 5578,0 5574,5 5570.5 5566,0 5557.0 5554,0 5552.5 5549,5 5549.0 5545.5 5544,5 5543.0 5541.0 ~538 5530.0 5526.0 o0 552'.~55 B 55~a sSo .o 5500.5 5497.0 5493.0 5488.5 547~.5 5469.0 '5421.0 5416.5 54 '5 5409.0 5393,0 '538~'5 5497,5 5494.0 5489.5 5486'5 5470.5 5466 O' 5461 0 5457 5 5454 0 5442 0 5437 0 5429 0 5425 5 542! 5 5415,0 54!0.5 ,IS Tar, e Veri~ication Llstln~ ~chlumber~erAlaska ¢omputin~ C~nter 5388 5376 5372 5368 5364 5360 5352 5349 5336 5332 5335 5328 5327 5324 5323 5320 5319 5312 5308 5304 5300 5296 5292 5~e4 5283 '5280 5279 5272 52 5264 5328,5 5325,0 5320,5 533.7,0 5281,0 5277,5 5265.5 5386.5 5382e0 537?.5 5374.0 5370,0 5365,0 536! 0 535R,0 5350,0 5345,5 29,0 5326, 5322, 5317. 5309,5 5306.0 5301.5 5298'0 5294,5 5290 0 5282:0 5278,5 5270,5 5267,0 lO"FEB-1995 ti{42 PAGE: 38 DATA FORMAT SPECIFICATION ** SET.TYPE - 64EB 6 ? 11 PECOPD ** R CODE VALI,IE 66 0 66 0 73 88 66 1 66 73 65 68 0 5. 65 66 11 0 i¢~h~eerger al~sk Co,put nn~ Center IO-FEB-1995 11:42 PAGEI 3g 15 66 68 16 66 1 0 66 SET ?YPE - CHAN ** ~~~;~~~l~~~l~~~l~F~~m~~~~~~~''.'.'A E ~R IT ~E V C P A~ BEU~B ~.U~B RIZE REPR ESS ID ORDE~ # LOG TYP~ CLASS MOD NUmB SA~P ~6E~ CODE (HEX) ........ ........ ................ .... .... . ?T 500610 O0 000 O0 0 5 I I 4 68 0000000000 $~G~ TDTP CU 500610 O0 000 O0 0 5 I I 4 68 0000000000 TPH! TDTP PU-$ 500610 O0 000 O0 0 5 1 1 4 6~ 0000000000 $BHF TDTP CU 500610 O0 000 O0 0 5 I I 4 68 0000000000 SBH~ TDTP CU 500610 O0 000 O0 0 5 1 I 4 6fi 0000000000 S?GC TDTP CU 500610 O0 000 O0 0 5 I ! 4 68 0000000000 $IBH TDTP CU 500610 O0 000 O0 0 5 1 ! 4 68 0000000000 T~AT TDTP 500610 O0 000 O0 0 5 1 I 4 68 0000000000 SDS{ TDTP CU ~00610 O0 000 O0 0 5 1 I 4 68 0000000000 BACK TDTP' CPS 500610 O0 000 O0 0 5 I I 4 68 0000000000 FBAC TDTP CPS 500610 O0 000 O0 0 5 1 I 4 68 0000000000 TCA~ TDTP CPS 500610 O0 000 O0 0 5 I 1 4 68 0000000000 TCA~ TDTP CPS 500610 O0 000 O0 0 5 1 1 4 68 0000000000 TC~D TDTP CPS 500610 O0 000 O0 0 5 1 1 4 68 0000000000 TCFD TDTP CPS 500610 O0 000 O0 0 5 I 1 4 68 0000000000 ?SCM TDTP CPS 500610 O0 000 O0 0 5 1 1 4 68 0000000000 T$CF TDTP CPS 500610 O0 000 O0 0 ~ I 1 4 68 0000000000 I~ND TDTP 'CPS 5006:10 O0 000 O0 0 5~ I I 4 68 0000000000 I~FD TDTP CPS 50061.0 O0 000 O0 0 5 I i ~4 68 0000000000 G~CH .TD?P GIPI 500610 O0 000 O0 0 5 1 I 4 68 0000000000 T~N$ TDTP LB 50:0610 O0 000 O0 0 5 1 I 4 68 0000000000 CCL TDTP . V 500610 O0 000 O0 0 5 1 1 4 68 0000000000 DATA DrPT,::: 666~:000.4 SRHN,TDTP 579 SIGC,TDTP 1:,:. BH,TDTP ~ 7 TPAT TDTP ?CAF'.TDTP 88!4,957 TC~D..TDTP 19 ~ TCFD-.TDTpFBAC'TDTP 49 : 08 TCA~.TDTP T~CF,TDTP 989~264 INND,TDTP 197~:796 INFD,TDTP 37~ ~0 T$C~ TDTP TENS.TDTP 8!51000 CCL'TDTP 0.000 8 GRCH:~TDTP D~PT' 4500~000 SI~*TDTP 17.502 TPHi.TDTP 36,722 $B'HF-TDTP SBHN,TOTP 45-393 SXGC'TDTP 4.339 SIBH.TDTP 45-393 TRAT,TDTP SDSi'TDTP 1'003 BACK'TDTP 171'507 FBAC,TDTP 25.980 TCA~.TDTP T$Cr,TOTP 162 : 09 INND,TDTP 178 : 1 :INFD.TDTu '397:20 G~C~'TDTP TEN$.TDTP 665.000 CCL,TDTD 0.000 ' '*' ' 3B.4gB 2,196 326:12.379 3582 '68 35.635 1.881 22410,918 4564,111 43.844 ;chlUmberger AlasK Comput ~ Center lO-FEB-1995 11:42 PAGE: 4O END OF DATA · *~ FILE TRAILER FILE NAME : EDIT ,005 SERVICE : rblC VFR$ION : DRT~ ~ 95/02/10 FILE TYPE : LO LAST FILE t **** FILE HEADER **** FTLF NA~E : EDIT ,006 SERVICE : FLIC VERSION : O0~CO! MAX REC SIZE : 1024 f'IbE TYPE : LO L~ST FiLE FILE HEADER FIL~ NUMBER: 6 EDITED CURVES DePth.shifted and clipped curves for each pas. s'[n separate files, PASS NU~BERI 6 ' ' D~PTH I~CREMENT~ 0,5000 FIL~ SUMMARY LDWG,TOOL CODE START DEPTH STOP DEPTH CRCH 6636,0 5670,0 TDTP 6650,0 5670,0 CURVE SHIFT DATA - PASS TO PASSiMEASURED DEPTH) BASELINE CURVE FOR SHIRTS LDW~ CU~V~ CODE~ GRCH PAS8 NUMBER: ----------EQUIVALENT UNSH!FTED DEPTH'-'-''''-- BASELINE DEPTH .... R88 0 6647 5 6635 5 6631 5 6627 5 GRCH TDTP 6647 0 663610 6630 5 6626 5 ,I$ T~e Verification Listing IO-FEB=I. gg5 11:42 PAGE{ 41 6626, 6623. 6619 6615 6614 6611 6610 6603 6599 6595 6591 6587 6583 6579 6575 6574 6571 6570 6566 6559 6555 655~ 654 6543 6535 6531 6527 6523 6~22 65i~ 6515 6514 6511 6510 6507 6303 64 6495 6494 649! 6474 6471 6470 6467 6466 6459 6455 6450 6447 6446 6443 6439 6626.0 6614.0 6609,5 6577.5 6574.0 6569.5 6566,0 6522,0 6517.5 6514.0 6509.5 6497,5 6493,0 6473°0 6469.5 6466.0 6450,0 6445,5 6620.5 6617,0 6614,0 6610.5 6602.5 6599.0 6595.0 6591. 5 6587:0 6583.0 657R.0 6575.5 6570,5 6558 5 6555 5 6551 0 6547 0 6542 5 6534 5 65 0 6523 0 6519.0 6514.5 6510.5 6507.0 6502.5 6499.0 6495,0 6490,5 6470,5 6466.0 645R,0 6453,5 6446.5 6442 · 0 643~.5 I$ ?aUe Verification Ltstino chlumberger AlasKa Computin~ Center 6435 6434 6431 6430 6427 6426 6423 6422 641! 6407 6406 6403 6399 6398 6382 637q 6378 6375 637] 6367 6363 6355 6351 63 6346 6343 6339 63 6326 6322 6319 6318 63~5 6314 6311 6310 6307 6306 6303 630~ 6~99 6298 6~94 6~9~ 290 6286 6279 6278 6~75 6433.5 6429.0 6426.0 6421.5 6405.5 6398.0 6382.0 6377.5 6349.5 6346.0 6330,0 6326,5 6322'5 6318,0 63t4,5 63i0,0 6306,0 6302.5 6298,0 6294.0 6~90.5 6286,0 6278.0 6435.0 6431,0 6425,5 6423,0 6411,0 6406,5 6402.5 6399.0 6379.0 637~.5 637 .0 6367.0 6362 5 6354~5 635!.0 6346.0 6342.0 6338'5 6335 0 6327,0 6319.0 6314,5 6310'5 6306,0 6301,5 6296.0 6~89,5 6~86.'5 6279.5 6275,0 Tame Verification bist~nq ,¢h~umberQer AlasKa ¢omputlno Center lO-FEB-1995 11:42 PAGE: 43 6274. 6263. 6259, 6255, 6251 6247 6243 6239 6235 6231 6227 6223 6219 621 6215 6211 6203 6J99 6~06 6~79 6175 6167 6163 6!6~ 6158 615~ 6154 615.1 6150 6147 6~46 6~4~ 6142 6i39 61 6t 4 6t3~ 6t26 6!23 612~ 6114 6111 6II0 6103 6102 6099 609) 5 5 5 5 5 5 5 5 5 5 5 5 5 $ 5 $ 5 5 $ :$ .5 5 5 5 5 $ 5 5 5 5 5 .5 5 5 5 5 5 $ 5 6274,5 6218,5 618~.0 616!,0 6158'~ 6149,0 6145,5, 6142,0 6138,0 6133.5 6129,5 6125,0 6121,5 61t7.5 6113,0 6109.0 '6102.5 6263.0 6258.5 6255,5 6251.0 6247,5 624~ 5 6238 0 6234 5 6230 5 6227 0 6223 0 6218 5 6214,5 6211,5 6203 5 6179,0 6174 5 6172i0 6167 5 6163 0 6155.0 6150,5 6!47,0 6143.0 6138.5 6135'.0 6!31,0 6126.5 6!23.0 6119,0 6111,0 6099,0 6095,5 Tape Yeriflcatlon Llstino ~chlu~berger Alaska Co~putln.~ Center 10-F~B-1995 11142 PAGE: 44 6091 6087 6083 6079 6075 6071 6067 6063 6059 6055 6051 6047 6046 6042 6035 6031 6O22 6019 601~ 6015 6014 6011 6007 6003 599~ 599 5987 5983 5979 5975 597! '5967 5963 5962 5959 5958 5955 5951. 595O 5947 5946 594] 5939 5935 5934 5930 5923 59:~9 59 5 5914 5911 5907 5903 5 5 5 $ 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 6046.5 6041.5 6021.5 6018,0 6013.5 5961.5 5958.0 5950.0 5946,5 5942.0 5938,0 59~4,5 59 0,0 5914.0 6091.0 6087 0 6083 5 6079 0 6075 5 6071 0 6067.0 6063.5 6059.0 6055.0 605~.5 6047.5 6035.5 6030,5 6018,5 6015.0 6010.0 6007'0 6002.5 5987 0 5979,0 5974.0 5971.0 5967"5 596~.0 5954,5 595!,0 5947,0 5942.0 5938,0 5935'0 ,5923,0 50 .0 5010,0 5906:50 590~ ,18 ?ape Verification Listina ,¢hlt)mberger AlasKa Computln~ Center 10-FEB-1995 11:42 PAGE{ 45 5899 5 5895 5 5894 5 5~9! 5 5887 5 5883 5 5879 5 5875 5 5874.5 58 .5 5867 5 5866 5 5850 5 5847 5 5846 5 5843 5 5842 5 5839 5 5838 5 5835 5 5834 5 5827 5 5826 5 5823 5 5822 5 5819 5 58 5 58115 5807 5 5803 5 5799 5 57955 579t 5 5787 5 5783 5 5782 5 5779 5 5778 5 577~ 5 576~5 5763 5 5759 5 57585 5755 5 57545 575! 5 5750 5 5747 5 5746 5 5743 5 5742 5 5~93.5 5873.5 5870,0 5866.0 5861,5 5849.5 5846.0 584i,5 5838.0 5833,5 5~25.5 5821,0 5817,5 5781.5 5778,0 5758.0 5753.5 5749,5 5746,0 5741.5 5898.0 5893.5 5890.0 5885.5 5882.0 5877.5 5873.5 5870.5 5867.0 5847.0 5842,0 5839.0 5834,5 5826,5 5823,~ 5819,0 5815 5 581! 0 5807 0 580~ 5 5798 5 5795 0 5791 0 5787 5 578~ 0 5779.5 5771.5 57 '.o 5754.5 5751,0 5747.0 5743.5 5739,0 Tape Verification Listing ichlumberger AlasKa Computin6 Center lO-FEB-~995 11:42 573R.5 5735,5 5734,5 5731 5 5730 5 5727 5 5726 5 5722 5 5718 5 5691 5 lO0 0 $ 573~.0 5735.0 5733.5 5730.5 5730.0 5727.0 5726.0 5721,5 5718.0 5690.0 99,5 98,5 RE.ARKS{ THIS FILE CONTAINS ~ORAX PiSS {4 OF THE TDTP, THE DEPTH CORRECTIONS SHOWN ABOVE REFLECT' BORAX PASS #4 GRCH TO BiSE PASS #! GRCH AND BORAX PASS #4 SIGN TO BASE PiSS #1 SIGN. ALL OTHER TDTP CURVES WERE CARRIED WITH THE SHtFTS" $ LIS FORNAT DATA PAGE: 46 DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALt{£ i 66 0 2 66 0 73 66 :5 66 6 73 7 65 8 68 0,5 9 65 ~T Ii 66 !~ 68 13 66 0 14 65 FT 15 66 68 16 66 0 66 I IS Ta~e Verification List!hq ch!umberqer Alaska Comput!no Center PAGE: SET TYPE - CHAN ** UNIT SERVICE API APl APl APX FI~E NUVO "U"B SiZE REPR P"OCE$$ '"'''''"'";';~i~"~'"~""~''"''";''"i'""i~.T o oo o ..... 2'''"~ ..... , ~3~3:3"~"~ oo cu soo6,o oo ooo ooo 6 ~ ~ ~ ~ oooooooooo Pu-s soo~o oo ooo ooo ~ ~ , 4 ~ oooooooooo cu ~oo~,o oo ooo ooo ~ ~ ~ ~ ~ oooooooooo CU 500610 O0 000 O00 6 1 1 4 68 0000000000 cu ~oo~,o oo ooo ooo ~ 1 ~ ~ ~ oooooooooo cu ~oo~,o oo ooo ooo ~ ~ , ~ ~. oooooooooo 500610 00 000 00 0 6 I 1 4 6~ 0000000000 cu ~ooe,o oo ooo ooo ~ , . 4 ~ oooooooooo c.s ~oo~lo oo ooo ooo ~ ~ ~ 4 ~ oooooooooo cps soo~,o oo 000 oo0 s ~ , 4 ~ 0000000000 cps soo~,o oo 000 oo0 ~ , ~ 4 ~ 0000000000 c,~ ~00~0 oo 000 oo0 ~ ~ , , 6~ oooooooooo cps ~oo~o oo ooo ooo ~ ! ~ ~ ~ oooooooooo c~$ ~oo~,o oo ooo ooo ~ ~ ~ ~ ~ oooooooooo c~s ~oo~,o oo ooo ooo ~ , , 4 ~ oooooooooo c.s ~oo~,o oo ooo ooo ~ ~ ~ ~ 6~ oooooooooo c.s soo~,o oo ooo ooo ~ , ~ 4 ~ oooooooooo c~s ~oo~,o oo ooo ooo ~ , ~ ~ ~ oooooooooo =.P~ ~oo~!o oo ooo ooo ~ ~ ~ . ~ oooooooooo ~ ~oo~,o oo ooo ooo ~ ~ , 4 ~ oooooooooo V 50061.0 O0 000 O0 0 6 1 1 4 6~ 0000000000 47 DEPT., S~HM.TDTP SDS~,TDTP TCAF.TDTP: TSCF.TDTP TENS*TDTP DEPT. SBHN.TDTP SDSI.TDTP TCAF,TDTP TSCF.TDTP TENS.TDTP 6650.000 SlGM'TDTP 29.49B TPH],TDTP 57'831 44.812 S]GC,TDTP 0:866 SIBHoTDTP 44=~812 I.t06 BACK,TDTP 1~'514 FBAC,TDTP 25.646 9422*500 TCND,TDTP .211 i ,125 TCFD,TDTP 5497~000 1163.7~7 iNND*TDTP 1716.625 INFD.~=DTp 362.078 837.609 CCL°TDTP 'O.OOO 5670'000 5IGH.,TDTP $6.594 TPHI.TOTP 60.660 53,i97 SiGC*TDTP 1.550 SIBH.TDTP 54.788 I,:743 BACK,TDTP 16~-820 FBAC-TDTP 24.626 5095,938 TCND*TDTP 1618~.500 TCFD,TDTP 4190'828 537'812 INND'TDTP I~35'906 INFD,TDTP 361,820 760.1!] CCL.TDTP 0.000 SBHF.TDTP TRAT.TDTP TCAN. TDTP TSCN.TDTP GRC~.TDTP SBHF. TDTP TRAT 2 TDTP TCAN.TDTP TSCN. TDTP GRCH · TDTP 105 318' 000 40165:438 '999.250 49.563 1.872 ~18482.250 !.889.016 15,021 END OF DATA ~I$ TaPe Verification Listing .chlumberger Alaska Computing Center **** FILE TRAILER FILE NAME : EDIT .006 SERVICE ~ Fb~C V~R$ION ~ 00!C01 DAT£ : 95/02/10 M~X REC SIZ~ ~ 1024 FILE TYPE : LO LAST FIbE lO-FgB-1995 11:42 PAGE: 48 **** FILE HEADER **** FIL~ NAME : EDIT .007 V~SION m 001C01 DATE : 95/02/!0 MAX REC SIZE ~ !024 FIL~ TYPE : bO FILE HEADER FILE NUMBER: 7 AVERAGED CURVES Compensated Neutron{ Arithmetic average of edited passes for all curves, Pulked Neutron:Unaveraqed edited. PasS ! Gamma Ray and backround counts; arithmetic average of edited static baseline passes for all other curves, DEPTH INCREMENT 0,5000 '"'i"""' REMARKS: THE ARITHMETIC AVERAG~ OF PASSES 1 & 2 WAS PERFOR~E~ AFTER ALL DEPTH CORRECTIONS W~RE COMPLETED. $ ~TS FORMAT DATA DATA FORMAT SPECIFICATION RECORD ** SET TYPE - 64EH ** TYPE REP~ CODE V~LUE I 66 0 2 66 0 3 73 ~0 4 66 1 5 66 ;chi ~ erger las~a Computln_~ Center IO-FEB-19g5 11~42 PAGE~ 49 m~mmm~mm~mmmm mmmmm~ ! mm .... .......,,............... 7 65 9 65 1! 66 1~ 68 13 66 0 14 65 FT 1~ 66 68 16 66 0 66 mmmmmm~m~mmmmmmmm~mmmm#M! ** SET TYPE - CHAN ** m~mm~mmmmmmmmmmmmmmmmmmmmmmmmmmm~mm~mmmmm~mmmmm~mmm~mmmmm~m~~m~mm~mm~m~mm SERV UNIT 8E~VIC~ APl ~PI API AP! rILE NUMB NUMB SIZE REPR PWOCE$S ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) mmmeM~#m~mmlmm~mm~m~mNmmm~mmmmmmmmmmmmmm~m~mmmmmmmmmmmmmm~m~m~mmmm##mmmmmmmm D~P? ~? $006~0 O0 000 O0 0 7 I I 4 68 0000000000 SlG~ PNAV CU 500610 O0 000 O0 0 7 1 I 4 68 0000000000 TPH! PNAV PU-S 500610 O0 000 O0 0 7 1 I 4 68 0000000000 $~HF PNAV CU 500610 O0 000 O0 0 7 1 1 4 68 0000000000 SmHN PNAV CU 500610 O0 000 O0 0 7 I 1 4 6g 0000000000 STGC PNAV CU 500610 O0 000 O0 0 7 1 1 4 68 0000000000 SIBH PNAV CU 500610 O0 000 O0 0 7 ! I 4 68 0000000000 T~AT PNAV 500610 O0 000 O0 0 7 1 i 4 68 0000000000 SDS! PNAV CU 500610 O0 000 O0 0 7 I I 4 6~ 0000000000 B~CK TDTP CPS ~00610 O0 000 O0 0 7 1 1 4 68 0000000000 F~AC TDTP CPS 500610 O0 000 O0 0 7 I I 4 68 0000000000 TCAN PNAV CPS 500610 O0 000 O0 0 7 I I 4 68 0000000000 TCA~ PNAV CPS W00610 O0 000 O0 0 7 1 I 4 6~ 0000000000 TCN~ PNAV CPS 500610 O0 000 O0 0 7 1 1 4 68 0000000000 TCFD PNRV CPS 500610 O0 000 O0 0 7 1 i 4 6~ 0000000000 TSCN PNAV CPS 500610 O0 000 O0 0 7 1 I 4 68 0000000000 TSCF PNAV CPS ~00610 O0 000 O0 0 7 1 i 4 68 0000000000 I~ND PNAV CPS 500610 O0 000 O0 0 7 1 I 4 68 0000000000 INFD PNAV CPS ~00610 O0 000 O0 0 7 I I 4 68 0000000000 G~CH TDTP GAPI ~00610 O0 000 O0 0 7 1 I 4 68 0000000000 m~m~m~m~mmmm~mmmmmmmmmmlmmmmmmmmm , DEPT SBHN PNAV $:DS: PNAV TCAr PNAV T~CF,PNAV 6661,000 $IGM*PNAV 28 5~! TPHt.PNAV 53'771 43',~43 SIGC PNAV ~ ~ 4 $IBH.PNAV 43.143 Q, 69 BACK TDTP 5 66 FBAC.TDTP 22.576 937,.,!80 TCND,P,RV 21428 ~04 TCFD.PNAV 5454.755 !146'638 INND'pNAV t774.890 INFD,PNAV 359.373 SBHF.PNA~V TPAT.:PNAV TCAN.PNAV TSCN.PNAV GRCH.TDTP 37,029 '2,061 33002,625 3849,756 -999,250 IS Tape Verification Listing chlumbergerAlasKa Computing Center lO-FEB-1995 11:42 PAGE: 50 7 2 TPHI PNAV SBHN.PNAV ..1,936 SIGC,PNAV 2.3 3 SIBH.PNAV SDSI.PNAV 0,849 BACK,TDTP 144.566 FBAC.TDTP TCAF.PNAV 9993,037 TCND.PNAV 23R07.859 TCFD.PNAV TSCF,PNAV 1992,320 INND,PNAV 1927.919 INFD,PNAV 49.352 SBHF.PNAV 41.936 TRAT.PNAV 24.454 TCAN.PNAV 6573.926 TSCN.PNAV 389.401 GRCH.TDTP 33.2B9 2.137 30762.555 6133.222 36.844 ** END OF DATA **** FILE TRAILER FILE NAME : EDiT ,007 SERVICE : FLIC V~RSION : O01CO1 DATF : 95/02/10 MAX REC SIZE : 1024 FILE TYPE : LO **** FILE HEADER FILE NAME : EDIT SERVICE : FLIC VERSION : OO1CO! DAT~ : 95/02/1.0 M~X REC SIZE : !024 FiLE TYPE : LO LAST FILE : FIL~ NUMBER RAW CURVES Curves and log header data for each pass in separate pASS NUMBER~ DEPTH INCREMENT: 0.5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH S~OP DEPTH TDTP 667~,.5 447'0,0 DATE LOGGED1 SOFTWARE VERSiON~ TIME LOGGE~ ON B~TTO~~ TD DRILLER CF~)I TD ~OGgER('FT}. fll:es; raw bacK~round pass in last fi 21'NOV'94 40 2 1~iI 21-NOV-g4 72,0 6668,0 4soo:§ 666! t800.0 IS Ta~e Vertfi, cetioo LiStlnnO chlum erger Alaska Computi ~ Center lO-FEB-J. 995 11:42 PAGE.. 51 OEPTH CONTROL USED (YES/NO): TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TDTP'''''''''''''''' ~'~;'''''D TDTP TDTP CARTRIDGE TDTP TDTP DETECTOR TDTP TDTP GENERATO~ BOREHObE AND CASING DATA OPEN HOLE BIT STZE DRILLERS CASINg DEPTH (FT)~ LOGGERS CASING DEPTH (FT): BOREHObE CONDITIONS FLUID TYPE: FLUID DENSITY IbB~,i 80TTOM HOLE T~PE~AT FLUID RATE AT W~LLH~AD W~TER CUTS CHOKE (DEG)m NEUTRON TO0~ TOOL TYPE (EPiTHERMA~ OR THERMAL){ MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): R~NARKS; NO TOOL NUMBER ..... TNC 50 TND 78 TNG 2~ 2984.0 SEAWATER/BORAX -30 0 .oo:o THERMAL SANDSTONE 2.65 BLUELINE COUNT RATE NORMALIZATIOD~ IN OIL ZONE TOP NORMALIZING WINDOW (FT)." BASE NORMALIZING WINDOW (FT)..' BLUELINE COUNT RATE SCALES SE~ BY FIELD ENGINEER FAR COUNT RATE LOW' SCALE (CPS) FAR COUNT RATE HIGH SCALE -~E~R COUNT RATE LOW SCALE (CPS) NEAR COUNT RATE HIgH SCALE sTANDOFF TIE'IN WA BHCS DATED 4'6'88 LL OTHER PASSES' LOGGED' WHILE DY p~ACING STATIC F~UIDH~ THEN BORAX/SE4~ATER CONSIST4NT WE~BORE FLUIDS ~UdlEN SEAWATER OF NG.INITIAL ~ASELINE PASSES CAUSED RELATIVELY POOR POROSITY REPEATABIGITY~ $0 NO OVERLA~8 PRESENTED. SEE WELL 'WOR~ bOG FOR PUMP DETAILS AND RATES. P{.:}MPED A TOTAL OF !00 BBLS BORAX/SEAWATER AND ,IS Tape Verification Listino ;chlumberoer AlasR8 ComputinO Center 425 BBLS SEAWATER CHASER, TIME STAMPED ON LOGS IS MR FAST, (EG. 16000 ON LOG IS ~500 HRS) LIS FORMAT DATA PAGE: 52 ** DATA FORMAT SPECIFICATION RECORD ** SET TYPE - 64ES ** TYPE REP~ CODE VALIIE ~ 66 0 2 66 0 4 66 1 5 66 6 73 7 65 8 68 0,5 9 65 FT 12 68 13 66 0 14 65 FT 15 66 68 16 66 ! 0 66 1 ** SET TYPE - CHAN ** NAMM SERV UNIT SERVICE APl AP1 API APl FILE NUmB NUMB SIZE REPR PROCESS ID ORDER # bOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) ---------------------------------------------------------------------------------------~T FT 500610 O0 000 O0 0 8 I 1 68 0000000000 CU 500610 O0 000 O0 0 8 1 I 4 68 0000000000 SIGH PS'I TPH! SBHN $IB~ PSi TRAT SDS! PSi BACK FBAC TCAN TCAF TCND TCFD T$CN PU 500610 O0 000 O0 CU 500610 O0 000 O0 CU $00610 O0 000 O0 CU 500610 O0 000 O0 CU 500610 O0 000 O0 500610 OO 000 O0 CU 500610 O0 000 O0 C~S 500610 O0 000 O0 CPS 500610 O0 000 O0 CPS 500610 O0 000 O0 CPS 500610 O0 000 O0 10 bS 5006 O0 000 O0 ~00610 O0 000 O0 CPS 500610 O0 000 O0 0 8 1 I 4 68 0 8 1 1 4 68 0 8 I ! 4 0 8 I I 4 68 0 8 I i 4 68 0 8 I I 4 68 0 8 I I 4 68 0 8 I I 4 68 0 8 I 1 4 0 8 1 I 4 68 0 8 I I 4 68 0 8 I 1 4 68 0 8 I I 4 68 0 8 1 1 4 68 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 ,IS Tape Verification Listing ;chlumberger Alaska Computing Center lO-FEB-1995 11:42 PAGE: 53 ~D. ORDER # GOO TYP~ CLASS MOD NUMB SAMP ESEM CODE (HEX) ............................ .... ..---; .... .... ;-...... .... TSCF PSi CPS 500610 O0 000 0 1 1 68 0 ~ 000 INND PSi CPS 500610 O0 000 O0 0 8 I 1 4 68 0000000000 INFO PSI CPS 500610 O0 000 O0 0 B 1 1 4 6~ 0000000000 T~NS PSi ~B 5006!0 O0 000 O0 0 $ 1 1 4 68 0000000000 G~ PSi G!PI 500610 O0 000 O0 0 8 I 1 4 68 0000000000 CCh PS! V 500610 O0 000 O0 0 8 1 1 4 68 0000000000 DgPT. 6672.500 $IG~.PS1 SBHN,PS! 145.987 $IGC.P$1 8DS~,PS! 0,568 BACK,PSI TCAF,PSt 0.000 TCND.PS! T$CF.P$I 0.000 INND.PS! G~.PSl 35.656 CCL.PS1 22.074 TPHI.PSi 0.000 SIBH.P$1 1{.758 FBAC.PS1 -155.63] TCFD.PSI -0,400 INFD,P$1 0,000 38 TPHI.PSI OgPT, 4470.000 $IG~.P$1 2 '1916 SIBH~P~ $~H~.PS1 3t'417 SiGC:iPSi , s s . sl. !. ,4o. 1t TCAF'P$1 99~'6]i TCND,PS1 ~7065...-=, TCFD,PSI TS~F,P$~ 1984'869 INNO.,PSI 2135'167 GR.P$t ]8,188 COL'PS! 0.000 ** E~D OF DATA 0.000 SBHF.PS1 172.036 TRAT.PS! I].540 TCA~.PS1 -154,287 TSCN,PS1 -0.460 TENS,PSi 47.714 SBHF.PS1 31.4 7 TRAT.PS1 27.272 TCAN.PS1 712O.5~0 TSCN,PS1 412.2 8 TFNS.PS1 93,464 0.000 0,000 0.000 730.000 26.213 2.216 32693.668 6536.570 730.000 FILE NA~E : EDIT .,008 VERSION :001C01 DAT~ ' : 95/02/10 ~AX R~C SIZE : !024 FIL~ TYPE : LO LAST FILE : FiL~ NA~E : EDIT ,009 VERSION DAT~ : 95/0~/I0 F!L~ TYPE ~ LO LAST FiLE Tape Verification Listing .c.hlumberger AlasKa Computing Center lO-FfB-1995 11,:42 PAGE: 54 FILE HEADER FIL~ NUMBER 9 R~W CURVES Curves and log header data for each pass in separate PASS NUMBER: ~ DEPTH INCREMENT: 0.5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH TDTP 6670,0 $ LOG HEADER DATA DATE ~OG~ED~ $OFTWA,E ¥~RSION~ TIME LO~GER ON TD DRILLER (~T): TD LOGGER(FT TOP LOG ~NTERVAL (FT)~ ~OTTOM LOG INTERVAL LOGGING SPEED (FPHR~ DEPTH CONTROL USED ~ES/NO): STOP D~PTH 4459,0 TOOL STRING (TOP TO BOTTOM) V~NDOR TOOL CODE TOOL TYPE TDTP TDTP TDTP TDTP CARTRIDGE TDTP TDTP DETECTOR TDTP TDTP GENEPATO~ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZ~ (IN): ~T DRILLERS CASIN~ DEPTH LOGGERS CASING DEPTH (FT.): BOREHOLE CONDITIONS FLUID TYPE: FLUID S~LINITY FLUID LEVEL FLUID RATE ~T WELLHEAD WATER CUTS ~PCT): GAS/OIL R~T CHOKE (DEG)~ NEUTRON TOOL TOOL TYPE (EP!TH.ERNAb OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): files; raw background pass in last f~ 21-NOV-94 40,2 ~.511 6672.0 6668 0 4 oo:0 6661,0 1800.0 NO 21-NOV-94 TOoL NUMBER SHH EB 708 TNC 50 TND 78 TNG ~ 2984,0 SEAWATER/BORAX --30,0 ~,00,0 THERMAL SANDSTONE 2,65 TaPe Verification Listing ;chlumberqer AlasKa Computing Center lO-FEB-1995 11:42 # REMARKS BLUELINE COUNT RATE NORMALfZATION IN 015 ZONE TOP NORMAL)ZING WINDOW BASE NORMALIZING WINDOW RLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE FAR COUNT RATE HIGH SCALE (CPS): NEAR COUNT RATE LOW SCALE NEAR COUNT RATE HIGH SCALE (CPS): TOOL STANDOFF (IN): TIE-IN WA B~CS DATED LOGGED IST PASS WITH WELL STATIC ALL OTHER'PASSES LOGGED WHILE DISPLACING STATIC WELL FLUIDS THEN BORAX/SEaWATER ~EN SEAWATE~ bACK OF CONSIS~ANT WELLBORE FLUIDS 6U~NG. INITIAL ~ASELINF PASSES CAUSED RELATIVELY POOR POROSITY ~EDEATABILITY, SO NO OVERLAYS PRESENTED, SEE WELL WORK 50G FOR PU~P DETAILS AND RATES, PU~PED a TOTAL OF lO0 BBLS BOrAX/SEAWATeR AND 4~5 BBLS SEAWATER CHASER, TI~ STAMPED ON LOGS IS.~R FAST, (~. ~6000 O~ bO~ IS 1500 LIS FORMAT DATA PAGE: 55 DATA FORMAT SPECIFICATION ~ECORD ~ ** SET TYPE - 64EB ** TYPE ~EP~ CODE YALUE 1 66 2 66 0 4 66 5 66 6 73 7 65 8 68 0 5 12 68 ~4 65 · 15 66 68 !6 66 ! 0 66 IS Tame Verification Llstinq chlum~erger Alaska Computino Center PAGE: ** SET TYPE - CH~N ** '''''"'''''''''''';~;'i~'''''''';i''~''''N~M~ $~RV UNX~ V ~PI~ ~ PI ~. P!''''FILE ..... ~''~'''~i~. '''~;~'''~''''''" _ ESS XD ORDER # LOG TYPE CLASS MOD NUMB $~Mp ELEM CODE (HEX) D~PT FT 500610 O0 000 O0 0 9 i I 4 68 SXG~ P$2 CU 500610 O0 000 O0 0 9 1 1 4 68 TPH! PS2 PU 500610 O0 000 O0 0 9 ! 1 4 68 5P~F P$~ CU 500610 O0 000 O0 0 9 1 I 4 68 S~HN P52 CU 500610 O0 OOO O0 0 9 1 I 4 68 STGC P$2 CU 500610 O0 000 O0 0 9 1 I 4 68 SIB~ P52 CU 500610 O0 000 O0 0 9 1 1 4 68 T~AT P$~ 500610 O0 000 O0 0 9 1 1 4 68 SDSX P$2 CU 500610 O0 000 O0 0 9 I 1 4 68 B~CK P$2 CPS 500610 O0 000 O0 0 9 1 I 4 68 FBAC ~S2 CPS 500610 O0 000 O0 0 9 1 1 4 68 TCAN P$2 CPS 500610 O0 000 O0 0 9 1 1 4 68 TCAF P$2 CPS 500610 O0 000 O0 0 9 I 1 4 68 TCND P$2 CPS 500610 O0 000 O0 0 9 1 I 4 68 TCFD P$2 CPS 500610 O0 000 O0 0 9 1 I 4 68 TSC~ P$~ CPS 500610 O0 000 O0 0 9 1 1 4 68 TSCF P$2 CPS 500610 O0 000 O0 0 9 1 1 4 68 INND PS2 CPS 500610 O0 000 O0 0 9 I I 4 68 INF~ P$~ CPS 500610 O0 000 O0 0 9 ! I 4 68 TFN$ P52 LB 500610 O0 000 O0 0 9 I ! 4 68 G~ P$2 GAP! 500610 O0 000 O0 0 9 I I 4 68 COb P$2 V 5006i0 O0 000 O0 0 9 1 ! 4 68 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 mmmmmmm~mmmmm~m~mm~m~~mm~m~m#m~mmmmmmmmmmmmmmmmmmmmmmmmmmmmmm#~#~mmmmmmmm~mmmm 56 DEPT SDS! P$2 TCAF PS2 TSCF P52 GR PS2 DEPT SBH~ P$2 SDS! PS2 TCAF TSCF G~ PS2 66?0.000 SI~M.PS2 20.138 TPHI.,PS2 47,774 SBHF.'PS2 31.417 SXGC,P82 3~6~1 $IBH'PS2 31,417 TRAT,PS~ 1 ~]7 BACK,PS2 !40 6 1 FBAC,PS2 27.272 TCAU.PS2 1984 869 XNND'P$2 21 67 INFD,PS2 412;298 TENS.PS~ 315,250 CCL'P$2 0 O0 4489.000 8IG!.PS2 18 627 TPHI,PS2 ]7.701 SI~¢.P$2 3~3t SIBH.PS2 BACK,,PS2 162,40! FBAC, PS2 0 956 xoo oZ]4 ~003.267 TCND.P$2 22949.441 TCFD,P$2 INND,P82 t764 945 INFD.P82 43,011 CCh. PS2 0:000 ~'39.710 SBHF.PS2 37,701 TRAT.PS2 24~689 TCA~,PS2 6645-10~ TSCN,P$2 420,077 TENS.PS~ 26.213 2'2~...6 32693.668 65.]6,570 720,000 30,766 58I.~:745 71 000 END OF DATA Tape Verification Listing ~chlumberger Alaska Computing Center 10-FEB-1995 11:42 PAGE: 57 **** FILE TRAIDER FILE NAME : EDIT .009 S~RVlCE : FLIC VERSION : 001C01 DATE : 95/02/!0 MAX AEC SIZE : 1024 FILE TYPE : LO LAST FILE **~* FILE HEADER FILE NAME : EDIT ,010 SERVICE : FLIC V~RSION : 001C01 DATE : 95/02/10 MAX REC SIZE : 1024 FILE TYPE : LO LAST FISE FILE HEADER FIL~ NUMBER 1.0 RAW CURVES Curves and log header data for each pass in separate P~SS NUMBER: 3 DEPTH INCRE~ENT~ 0,5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPT~ ...........-.... TDTP 667..0 84,0 # LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TI,E LOGGER ON BOTTOM: TD DRILLER (FT): TD LOGGER(FT): TOP LOG INTERVAL TOOL STRING (TOP TO BOTTOM] VENDOR TOOL CODE TOOL T~PE ...... .... . TDTP TDTP CARTRIDGE TDTP TDTP DETECTOR TDTD TDTP GENERATOR files; raw background pass in last 21-NOV-94 40.2 15!! 21-NOV-94 6672.0 6668,0 4500,0 6661.0 1800'0 NO TOOb NUMBE~ $~EB 708 THCS0 TND 78 T~ 2! IS Tape Verification Listing chlumbergerAlaska Computing Center lO-FgB-igg5 i1:42 PAGE: 58 ~OREHOLE AND CANING DATA OPEN HOLE BIT SIZE (IN): DRILLEPS CASING DEPTH LOGGERS CASING DEPTH (FT): 80REHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G)i SURFACE TEMPERATURE (DEGF): BOTTOM HOLE TEMPERATURE FLUID SALINITY FLUID bEVEL (FT): FLUID RATE AT WELLHEAD (BPM): WATER CUTS GAS/OIL RATIO: CHOKE (DEG)~ ~EUTRON TOOL TOOL TYPE (EP!THERMAL OR THERMAL): MATRIX: MATRIX DENSITY~ HOL~ CORRECTION (IN): 2q84.0 SEAWATER/BORAX -30.0 100.0 THERMAL SANDSTONE 2.65 BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE TOP NORMALIZING WINDOW BASE NORMALIZING WIg{DOW CFT): ~bUELINE COUNT RATE SCALES SET BY FIELD ENGINEER F_~R COUNT RATE LOW SCALE (CPS)~ FAR COUNT ~ATE H~GH SCALE (CPS): NEAR COUNT RATE bOW SC.AbE (CPS):. NEaR COUNT RATE HIGH SCALE TOOL 'STANDOFF (IN): RE,ARAS{ TIE-iN WA B..CS DATED 4-6-88. bOGGED IST PASS W~TM WEL[~ STATIC. ALL OTHER P~SSES LOGGED WHILE DISPLACING STATIC WELL FLUIDS THEN BORAX/S~WATER'~ THEN SEAWATER,~ bACK OF CONSIS~ANT WELLBORE FLUIDS DURING INITIAL.BA:SEblNE P~SSE~ CAUSED RELATIVELY POOR POROSITY REPEATABILITY, · SO NO OVERLAYS PRESENTED, SEE WELL, WORK bOG FOR ~U~P DETAILS AND RATES. PUMPED A TOTAl, OF 100 BBLS ~ORAX/SEAW~TER AND 4~5 B~b8 SEAWATER CHASER, TI~ ST~PED ON LOGS IS MR FAS1~, (EG. 16000 ON bOG IS ~500 MRS) LIS FORMAT DATA Tape Verification Listing ;chlumberger AlasKa Computing Center lO-FSB-1995 1t:42 PAGE: FORMAT SPECIF!CATYON RECORD ** ** SET TYPE ,, 64ES ** T E VhL I 66 0 2 66 0 3 73 88 4 66 5 66 6 73 7 65 8 68 0.5 9 65 FI 12 68 13 66 0 14 65 FT 15 66 68 !6 66 0 66 mmm~mmm~~~m~mmm~mmmm~m NAM~ ~V UNIT SERVICE ID ORDER # pT FT 500610 $IGM P$3 CU 500610 TDHT PS3 PU 500610 SBHF PS3 CU 500610 SBHN PS3 CU 500610 SIGC PS3 CU 500610 SIB~ PS~ CU 500610 TEAT P$~ 500610 SDS! P$3 CU 500610 B~CK PS3 CPS 500610 FBAC P$3 CPS 5006~0 TCA~ PS3 CPS 500610 TCAF P$3 CPS 500610 TCND ~S3 CPS 500610 TCF~ P$3 CPS 500610 TSC~ PS3 CPS 500610 TSCF PS~ CPS 500610 INND PS3 CPS 500610 INFD PS3 CPS 5006{0 GP PS3 GAPI 5006{0 CCL P$3 V 500610 API APl API API FILE NUMB NUMB SIZE ~EPR PROCE86 LOG TYPE CLASS NOD NUmB SA~P ELEM CODE (HEX) O0 000 O0 0 10 1 ! 4 6~ 0000000000 O0 000 O0 0 t0 1 1 4 68 0000000000 O0 000 O0 0 10 1 1 4 6~ 0000000000 O0 000 O0 0 10 I I 4 68 0000000000 O0 000 O0 0 10 I 1 4 68 0000000000 O0 000 O0 0 10 I 1 4 68 000000:0000 O0 000 O0 0 I0 I 1 4 6~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g Tape verification Listing ;chlumberger AlasKa Computing Center DEPT, 6670,000 SlGM,PS3 SRHN,PS] 45,150 SiGC,P$3 SDS~,PS3 1,059 RACK.PS3 TCA~,PS3 8802,104 TCND.P$3 TSCF,PS] 1177.917 INND,PS3 G~,PS3 89,125 CCD.PS3 D£PT, 5784,000 SIGM,P$3 SRHN,PS3 89.742 $IGC,PS3 SDS?.P$3 0,837 BACK.PS3 I~AF.PS3 4294,456 TCND.PS3 CF.PS3 857,404 INND.PS3 G~,P$3 32,969 CCL,PS3 END OF DATA 10=F58-1995 11:42 25,087 TPHI.P$3 3.273 SIBH.PS3 220.555 FBAC.PS3 19629.438 TCFD,PS3 1656.125 INFD.PS3 0.000 21.345 ?PHI.PS3 162.475 FBAC,PS3 9799.~54 TCFD.PS3 18300~02~30 INFD.PS3. 42.963 SBHF.PS3 113.270 TRAT.PS3 24.829 TCAN.PS3 3161.168 TSC~.PS3 353.278 TENS.PS3 PAGE: 60 37.668 2.022 29597.832 3698.64! 645.000 70.331 1.711 10643.117 2124.937 745.000 **** FILE TRAILER **** FIDE NAME : EDIT ,010 SERVICE : FLIC VERSION : O01CO1 DAT~ : 95/02/10 M~X REC SIZE : 10~4 FILE TYPE : LO L~ST'FILE : **** FILE :HEADER F!bE NAME : EDIT ,01! SERVICE , ~blC V~RSXON : 00~0! D~T~ : 95 ~/~0 MAX REC SIZ~ : ~0~4 Ft5~ iTYPE ) LO LaST FIDE F1 E HEADER FIlE Nt]~BER R~N,CURVE$ Curves and PASS NU~BER~ DEPTH'INCREMENT: FILE SUMMARY VENDOR.TOO~ CODE TDTP 1¸1 log header data for 4 0,5000 6662,0 each Pass in separate STOP DEPTH 5658,5 ftles~ raw bac~g'round pass in last fi TaPe Verification Listing ieblumberger AlasKa Computing Center 61 # LOG HEADER DATA SOFT,ARE VERS,ON, TIME LOGGER ON BOTTOM: ?D DRILLER TD 50GGERCF ) TOP LOG INTERVAL (FT): ~OTTOM L~G INTZRVAL 50GGING SPEED (FPHR): OEPTH CONTROL USED (YES/NO): TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOGL TYPE ---------------- .... T~T~ TDTP TDTP CARTRIDGE TDTP TDTP DETECTOR TDTP TDTP GENERATOR ~O~EHOLE AND CASING DATA OPEN ~ObE BIT SIZ~ ~RILLERS CASING DEPTH ~O~GERS CASING D~PTH ~OREHOLE CONDITIONS FLUID TYPE: FLUID ~EN$ITY (LB/G) S[~RFACE TEMPERATURE BOTTOM HOLE TEMPERATURE (DEGF)~ FLUID SALINITY (PPM)~ FLUID LEVEL (FI): FLUID RATZ AT WELLHEAD WATERCUTS GAS~OIL RATIO~ CHOKE (PEG)~ 2~-NOV-94 40,2 6672.0 6668.0 4500,0 666 N~ NEUTRON TOOL TOOL TYPE (MPITHERMAb OR THERMAL): ~TR!X: ~ATRIX DENSITY: HOLE CORRECTION (IN): BLUELINE COUNT RATE NORMALIZATION IM OIL ZONE TOP ~ASE NORMALIZING ~INDOW BDUELINE COUNT RATE SCALES SET BY FIELD EN EER NEAR COUNT RATE HiGH SCALE (CPS)~ 21'NOV-g4 TOOL NUMBER TNC 50 TN~ 78 TNG 21 2984.~ SEAWATER/BORAX -30.0 100,0 THERMAL SANDSTONE ~,65 TOOL STANDOFF IS Taue Verification Listlno chlumberger AlasKa ComPuting Center lO-FEB-1995 11:42 PAGEt 62 # R~MARK$; TIE-IN WA BHCS DATED 4-6-8~ bOGGED 1ST PASS WITH WELL~ATIC, ALL OTHER PASSES LOGG£D WHILE DISPLACING STATIC WELL FLUIDS. THEN BORAX/SEAWATER. THEN SEAWATER. LACK OF CONSISTANT WELLBORE FLUIDS DURING INITIAL BASELINE PASSES CAUSED RELATIVELY POOR POROSITY REPEATABILITY, SO NO OVERBUYS PRESENTED, SEE ~LL wOrK LOG FOR PU~P DETAILS AND RATES. PUMPE~ A TOTAL OF iO0 BBLS BORAX/SEAWATeR AND g~5 BBLS SEAWATER CHASER, TIM~ STAMPED ON bOGS ~S HR FAST, (EG, ~6000 ON LOG IS 1500 HRS) $ FORMAT DATA DATA FORMAT SPECIFICATION RECORD ** SET TYPE - 64gE TYPE REB~ CODE VALUE ! 66 0 2 66 0 $ 73 88 4 66 5 66 6 73 7 65 8 68 0.5 9 65 ii 66 12 68 13 66 0 15 66 68 16 66 0 66 I ** SET TYPE - CHAN ** .....................................,,...,...... .... ,,------,-.,.-.--,..,--.--,,--,--- NAM~ SERV UNIT SERVIC~ APl AP! I PI FILE N B NUM IZE EP PR ES ID ORDER # 50G TYPE CLASS HOD NUmB SA~P ELE~ CODE (HEX) D~DT FT 500610 O0 000 O0 0 li 1 ! 4 68 0000000000 $IO~ PS4 CU 500610 O0 000 O0 0 11 I I 4 6~ 0000000000 TPH! P$4 PU 500610 O0 000 O0 0 11 I I 4 68 0000000000 SBHF PS4 CU 500610 O0 000 O0 0 11 1 1 4 68 0000000000 SBHM PS4 CU 500610 O0 000 O0 0 11 1 I 4 OB 0000000000 S~GC PS4 CU 500610 O0 000 O0 0 11 1 1 4 68 0000000000 ,IS TaDe Verification Listin~ ichlumberger Alaska Computin~ Center lO-FEB-1995 11:42 PAGE: 63 tD ORDE. # LOG TYPE CLASS MOD NO.B SAMP EhEM CODE (HEX) STBH.P$4 CU 500610 O0 000 O0 0 11 1 i 4 68 0000000000 TRAT P$4 500610 00 000 00 0 11 1 1 4 68 0000000000 SD$I P$4 CU 500610 O0 000 O0 0 11 1 1 4 68 0000000000 B~CK P$4 CPS 5006i0 O0 000 O0 0 11 ! I 4 68 0000000000 FBAC P$4 CPS 500610 O0 000 O0 0 11 1 1 4 68 0000000000 TCAN P$4 CPS 500610 O0 000 O0 0 11 1 1 4 68 0000000000 TCAF P$4 CPS 500610 O0 000 O0 0 11 1 I 4 68 0000000000 TCND P$4 CPS 500610 O0 000 O0 0 ll 1 I 4 68 0000000000 TCFD P$4 CPS 500610 O0 000 O0 0 11 1 1 4 68 0000000000 TSCN P$4 CPS 500610 O0 000 O0 0 11 1 1 4 68 0000000000 T$C~ P$4 CPS 500610 00 000 00 0 il 1 I 4 68 0000000000 INND P$4 CPS 500610 O0 000 O0 0 11 1 1 4 68 0000000000 INFD P$4 CPS 500610 00 000 00 0 11 I 1 4 68 0000000000 TFN$ P$4 LB 500610 O0 000 O0 0 11 1 1 4 68 0000000000 GD~' PS4 GAPl 500610 O0 000 O0 0 11 I I 4 68 0000000000 CC~ P$4 V 500610 O0 000 O0 0 11 1 1 4 68 0000000000 mmmm~~m~mmm~m~mm~mmmm~mmmmmmm~m$~m~m~mm~mmmmmmm~mmmm~mmm~mmmmmmmmmmmmmm~mmmmm DEPT, 6662.000 $IG~.PS4 21.3i5 TPHI.PS4 42.963 SBHF.P$4 SBHN.P$4 89.742 SIGC.PS4 0 042 $IBH.P$4 113 270 TRAT'PS4 SDSI*P$4 0.837 BACK,PS4 I62~475 FBAC.P$4 24~829 TCAM.P$4 TCAF P$4 4~94,456 TCND,P~4 9799.~54 TCFD,PS4 316!.~68 TSCN,P$4 T$CF:P$4 857,404 tNND.PS4 1830.~8~ INFD,PS4 353..~78 TENS.PS4 G~*P$4 170.250 CCL.P$4 0.000 DEPT, 5658.500 SIGM.P$4 18.569 TPHI.PS4 42.398 GBHF.P$4 SBHN,PS4 ' 94-912 SIGC,P$4 '0,:02~~ SIBH'PS4 121.544 TRAT.P$4 SDS~,PS4 0,~53 BACK.PS4 162.852. FBAC'P$4 27.154 TCAN PS4 ~:CA~,P$4 4t54.~I7 TCND,PS4 9253.508 TCFD,PS4 2879.753 TScNiP$4 T$CF,P$4 857'257 ~NND,P$4 2065.~7~ !NFD.PS~ 400.089 TENS.PS4 GRIPS4 35~531 CCh. PS4 0,000 END OF DATA 70.331 1',711 I0643.1t7 2124.937 785.000 70.:063 1..770 10265.285 2118.276 760.000 S~RVICE V$R$!ON TYPE ~D!~ ,0[[ FL!C OOICO! 95/0~/10 024 1,0 ils Tame Verification Listing ,chlumberger AlasKa Computing Center lO-FEB-!995 11:42 PAGE: 64 **** FILE HEADER FZLE NAME : EDIT .0!2 SERVICE : FLIC V~RSION : 001COl DAT£ : 95/02/!0 MAX REC SIZE : 1024 F~LE TYPE LAST FILE FILE HEADER FILE NUMBER 12 RAW CURVES Cu~¥es and log header data for each pass in separate PASS NUMBERI 5 DEPTH INCREMENT: 0.5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH ..... ... 6 , 4, ~OG HEADER DATA DATE bOGGED: SOFTWARE VERSION: TIME LOGGER ON BOTTOM~ TD DRILLER TD TOP LOG INTERVAL (FT)~ BOTTOM LOG INTERVAL (FT): LOGGING SPEED DEPTH CONTROL USED YES/NO): TOOL STRING (TOP TO BOTTOM) VENDO~ T. OOL CODE TOOL TYPE TDTP TDTP TDTP TD~P CA~TRIDG~ TDTP TDTP DETECTOR TDTP TDTP GENERATOR BOREHOLE AND CASING DATA OPE~ HOLE BIT $IZ~ (IN): DRILLERS C~$ING DEPTH (FT): LO~GERS CASING DEPTH (FT): BOR~HOLE coNDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE TEMPERATURE (DEGF): BOTTO~ HOLE TEMPERATURE (DE~F): files; raw background pass in last fi TOOb NUMBER' ~HH EB 708 ~C50 TND 7~ TNG 21 2984,0 SEAWATER/BORAX -30.0 !00,0 2~-NOV-94 4 .2' !511 21-NOV-94 6672.0 6668.0 4500.0 6661.0 1800.0 NO tis Tape Verification Listing ;chlUmherger AlasKa ComPutin~ Center lO-FEB-1995 11:42 R~t~ARK~; FLUID SALINITY FLUID LEVEL FLUID RATE AT WELLHEAD WATER CUTS (PCT): GAS/OIL RATIO: CHOKE (DEn): NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX:, MATRIX DENSITY: HOL~ COnRaC?ION (IN): BLUgLINg COUNT RATE NORMALIZATION iN OIL ZONE TOP NOrmALIZING WINDOW BA~E NOR.ALIZING WINDOW BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE L~W SCALE FA~ COUNT ~ATE HIGH SCALE (CP!: ~EAR COU.T ~A~E ~OW SCAU~ (C.S : NEAR COU~T RATE HIgH SCALE (CP ): TOOL STANDOFF THERMAL SANDSTONE 2.65 TIE-IN wA BHCS DATED 4-6-~8_ LOGGED 1ST PASS WITH WELE. iS~:.ATtCI.,+ ALL'OTHER PASSES LOGGED WHILE DISPLACING STATIC WELL FLUIDS. THEN BORAX/SEAWATER. THEN SEAWATER. LACK OF CONSISTA~'T WELLBO~E FLUIDS DURING :INITIAL BASELINE PASSES CAUSED RELATIVELY PO0~ POROSITY REPEATABILITY, 80 NO OVERLAYS PRESENTED. SEE WELL WORK LOG F~R PU.~P DETAILS AND RATES. PU~PED A TOTAL OF !O0 B~LS BORAX/SEAWATeR AND 4~5 BBLS SEA.~AT~R CHASER~: TI~E STAPPED ON LOGS IS HR FAST. (EG. 16000 ON LOG IS 1500 HRS) LIS FORMAT DATA PAGE: 65 ** DATA FOR~A~ SPECIFICATION ~ECORD ** SET TYPE - 64EH ** TYPE REPR CODE VALI)~: 1 66 0 2 6 0 4 66 I 5 ~6 ,IS Tape Ver~fication Listing ;chlumberger Alaska Computing Center IO-FEB-19g5 1!:42 PAGE: 66 · YmE REPR CODE ¥~bllE 6 73 ? 65 B 68 0,5 11 66 11 1~ 68 1] 66 0 14 65 FI 15 66 68 16 66 1 0 66 NAMF SERV UNIT SERVIC~ API AP1 APl APl FILE NUMB NUMB ~IZE REPR PROCESS ID ORDER # LOG TYP~ CLASS MOD NII~B SAMP ELEM CODE (H~X) u~p? F? 5oo6~o oo ooo oo o 12 1 ~ 4 6~ oooooooooo s~. ~55 cu ~oo~io oo ooo oo o !~ 1 ~ 4 6~ oooooooooo TPHI P$5 PU 500610 O0 000 O0 0 12 1 I 4 68 0000000000 S~HF ~S5 CU 500610 O0 000 O0 0 12 1 i 4 68 0000000000 SBHN PS5 CU 500610 O0 000 O0 0 12 1 1 4 6B 0000000000 S~C ~55 CU 500~10 O0 000 O0 0 I~ I i 4 ~8 0000000000 SIB" P85 CU 500610 O0 000 O0 0 I2 ! I 4 68 0000000000 T~AT ~$5 500610 O0 000 O0 0 12 i 1 4 68 0000000000 S~S~ ~S~ CU 500610 O0 000 O0 0 i~ 1 1 4 68 0000000000 B!CZ ~$5 CPS 500610 O0 000 O0 0 12 1 I 4 68 0000000000 F~c ~55 c~s ~oo61o oo ooo oo o l~ I 1 4 6~ oooooooooo ?c~ ~ss c~s soo~lo oo ooo oo o 12 ~ ! 4 68 oooooooooo mcA~ .55 c~s ~00610 oo 000 oo 0 i~ ~ 1 4 ~e 0000000000 TCND PS5 CPS mO0610 O0 000 O0 0 1.2 I I 4 68 0000000000 TCFD PS5 CPS 500610 O0 000 O0 0 12 t I 4 68 0000000000 TSC~ .S~ CPS ~O0~lO O0 000 O0 0 12 ~ ~ 4 68 0000000000 T$C~ P$5 CPS 500610 O0 000 O0 0 12 1 1 4 68 0000000000 INND PS9 CPS 500610 O0 000 O0 0 12 1 I 4 68 0000000000 i~F~ ~s~ cps 5006!0 oo 000 oo 0 12 1 ~ 4 ~8 0000000000 T~S ~SS ~ s006~0 oo 000 O0 o 12 1 ~ 4 6~ oooooooooo g~ P85 G~P! 500610 O0 000 O0 0 12 I ! 4 68 0000000000 cch ~ss v soosio oo ooo oo o i~ ~ i 4 68 oooooooooo DEPT' . 6669.50.0 8IGM'P$5 .18.569 TPH!'PS5 SBHN,:P$5 94,912 SIGC,P$5 0.022 SIBH~PS5 TCAF:~P$5 4154.~1~ TCND.PS5 9253,508 TSCF,PS5 857.25 INND"P$5 206~.373 iNF G~..P$5 56-094 CCL':PS5 0,000 42 398 121. 544 , 7 28~9:753 400 089 SBBF.PS5 TRAT.PS5 TCAN-PS5 TSCN.PS5 TENS'PS5 70..063 t.770 1:0265.285 2118.276 775.000 ,IS TaPe verification Listing .chlumberger AlasKa ¢omputtn.~ Center lO-FgB-lgg5 1t:42 PAGE: 67 O~PT. 4464.500 SIGN.PS5 20.271 TPHIePS5 SBHN PS5 42.980 SIGC.PS5 ~,500 SIBH.PS5 SD$~:PS5 0 806 RACK,PS5 17~-999 FBAC.PS5 TCAF.PS5 11944:275 TCND,PS5 24561,176 TCFD.PS5 T$CF.PS$ 1682,324 INND,PS5 1R07.250 ~NFD.PS5 Gm.PS5 38,969 CCh. PS5 0.000 31,128 8BHF.PS5 42.980 TRAT.PS5 27.507 TCAN.PS5 6997.917 TSCN.PS5 466.685 TENS.PS5 35.505 1.756 35034.008 4536.698 640,000 END OF DATA **** FILE TRAILER **** FILF NAME : EDIT ,0!2 SERVICE ~ FblC VERSION ~ 001C01 DAT~ : 95/02/10 MAX R~C SIZE { 1024 FILE TYPE { LO LAST FILE { FILE NAME { EDIT ,013 ERSION ~ OO1C01 aT~ : 95t02/10 ~AX R~C SIZZ : 1024 F~L~ TYPE m LO LAST FILE ~ F!LF HEADER FILE NUMBER 13 RAW CURVES Curves and log header data for each Pass in separate P,~$S NUMBER~ 6 D~PTH INC~E~EN'T: 0,5000 FIL~ SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH -;;;;------ -'-------- T · .0 5669.0 $ LOG HEADE~ DATA DATE LOGGED: SOFTWARE VERSION: TIME LOGGER ON BOTTOm: TD DRILLER (FT): TOP [,OC ~NTE~VA~ (FT): tiles; raw backoround pass in last 2!-NOV-94 40,2 15!t 2t-NOV-94 6672.0 6668,0 4500,0 IS Tape Verification Llstin~ !chlumberger AlasKa Computin Center lO-FEB-1995 11:42 68 BOTTOM LOG.INTERVAL LOGGING SPEED (FPHR): DEPTH COWTR05 USED (YES/NO): TOOL STRING (TOP TO BOTTOM) V~NDOR TOOL CODE TOOL TYPE TDTP TDTD TDT~ TDTP CA~TRIDG~ TDTP TDTP DETECTOR TDT~ TDTP GENERATO~ $ BOREHOLE AND C~SING DATA OPEN HOLE BIT SIZE (IN): DRILLERS CASIN~ DEPTH LOGGERS CASING DEPTH (FT): BOREHOLE CONDITIONS FLUID TYP~: FLUID DENSITY (LB/G) SURFACE T~PERATURE iDEGF): BOTTOM HOLE TEMPERATURE (DEGF): FLUID SALINITY FLUID LEVEL (FT): FLUID RATE AT WELLHEAD WATER CUTS G~S/OIL R~TIO: CHOK~ (DEG): NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THER~AL)~ MATRIX: MATRIX DENSITY: HOLM CORRMCTION (IN): 6661.0 1~00.0 NO TOOL NUMBER ..... TNC 50 TND 78 TNG 21 2984.0 SEAWATER/BORAX -30.0 100,0 THERMAL SANDSTON~ 2,65 BLURb!NE COUNT RATE NORMALIZATION' IN OIL ZONE TOP NOrmALIZING WINDOW (FT): BASE NORMALIZING WINDOW BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR'COUNT RATE LOW SCALE FAR COUNT RATE HIGH SCALE (CP'):S NEaR COUNT RAT~ LOW SCAb~COP ): NEAR COUNT RAT~ HIgH SCALE (CPS): TOOL STANDOFF (IN): TiE-IN WA BHC$ DATED 4-6-88. LOGGED IST PASS ~ITH WELL STATIC. AI, b OTHER PASSES LOGGED WHILE DISPLACING STATIC WELL FLUIDS THEN BORAX/SEAWATER' THEN SEAWATER LACK OF CONSI$~A~T wELLBORE FLUIDS DURINGI P~$SgS CAUSED RELATIVELY POOR POROSITY REPEATABILITY, SO NO OVERLAYS PRESENTED, .,IS Tape Verification Listing ~cblumberger AlasKa ComPuting Center lO-FEB-1995 11:42 $~E WELL WORK LnG FOR PU~P DETAILS AND RATES. PUMPED A TOTAL OF 100 BBLS BORAX/SEAWATER AND 425 BBLS SEAWATER CHASER, TIHE STAMPED ON LOGS IS HR FAST, (EG, 16000 ON LOG IS 1500 H~S) $ LIS FORMAT DATA PAGE: 69 DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE i 66 0 2 66 0 3 73 88 4 66 5 66 7 65 8 68 0 5 11 66 ii 1~ 68 13 66 0 I4 65 FT 15 66 68 16 66 0 66 1 ** SET TYPE - CHAN ** -,-.----------,-,,,-,,,,----------- .... ~;~----~-~--- ........ .............................. AME SERV N ICE APl AP! AP ILE ~UMB NUMB SIZE REPR PROCESS ID ORDER ~ LOG TYPE CbA$S MOD NUMB SA~P. ELE~ CODE (HEX) ....... oo°° ;;---oooo ...... oo°° o,ooooooOOoooooooooo""- ~.~ ps6 ~u ~006~0 oo 000 oo 0 ~3 ~ i 4 6~ 0000000000 SOHF PS6 CU 500610 O0 000 O0 0 13 1 t 4 6~ 0000000000 s~c ~ c~soo~o oo ooo oo o ~ ~ 1 ~ ~ s~. ~s~ c~soo~,,o oo ooo oo o ~a~ ~ 4 ~ ~.~ ~ss sooo~o oo ooo oo o ~ ~ ~ 4 ~ s~s, ~s~ cosoo~,o oo ooo oo o ~a~ ~ 4 ~ ~c~ ~s~ c~s soo~o oo ooo oo o ~ ~ t 4 ~ r~,~c ~ss e~soo~o oo ooo oo o ,at ~ s ~ ~c~r ~s~ c~soo~o oo ooo oo o ~a~ ~ ~ ~ ~¢~ pss c~s soos~o oo ooo oo o ~.a ~ ~ 4 ~ 0000000000 000o0oo00o 00000oo000 o000000o0o 000000000o 000000000o 0000000000 0o00000000 0000000000 00000o0000 · ¥~rificetion Listin~ ,IS Te~er~ Ales~e Co~utin~ Center ;chlum g r lO-FEB-!gg5 11:42 PAGE: 7O ID mm~e~mm~w~m~m~mmm~mmemmmm TCFn PS6 CPS TSC~ PS6 CPS TSCF P$6 CPS INNO PS6 CPS INFO PS6 CPS TKNS PS6 bR GP PS6 G~P! COL PS6 V mmmmmmmmmmmmmm~mm! .... ..... .... ........... 500610 O0 ooo oo 500610 O0 000 O0 500610 O0 000 O0 500610 O0 000 O0 500610 O0 000 O0 500610 O0 000 O0 500610 O0 000 O0 500610 O0 000 O0 m ~m~ ~ ~ mm mmmm mm mmm ! MOD NUMB SAMP ~bEM CODE (HEX) '""'"'"'"'""",' .... ;l .... ' .... ";;;" 0 13 1 I 0000000 0 13 1 1 4- 68 0000000000 0 13 1 I 4 68 0000000000 0 13 1 I 4 68 0000000000 0 13 I 1 4 68 0000000000 0 13 1 1 4 68 0000000000 0 13 1 1 4 68 0000000000 0 13 1 1 4 68 0000000000 mmm~{~{~{)~mmm~{~,~{m~{~,~m~{~mmmmmmmmmmmmmmmmmmmmmmmm DATA DEPT, 6656.000 SIGM.PS6 $~H~,PS6 42.980 SIGC.P86 SDSI.PS6 0.806 BACK.PS6 TCAg. P$6 1~944 275 TCND.P$6 TSCF.PS6 t682:324 INND P$6 GR.PS6 53.469 CCh:PS6 D~PT 5669,000 SIGM.PS6 SRHN:PS6 51,437 $iGC.PS6 SDSI.PS6 I ~7~ BACK,PS6 TCA~.PS6 5947:69 TCND,PS6 TSCF,P$6 633'~8 INND.P$6 G~,.:Ps6 1,7,! 8 CCL'PS6 ** E..~D OF DATA 20.271 TPHI.PS6 31,.128 SBHF.PS6 6.500 SIBH.PS6 42'980 TRAT.PS6 175.999 FBAC,PS6 27.507 TCAN.PS6 24561,176 TCFD.,PS6 6997.917 TSCN.PS6 I807.~50 INFD,PS6 466.685 TENS.PS6 o'ooo 37,~ TPHI,PS6 60!946 SBHF.PS6 1, SIBH,PS6 51 972 TRAT.PS6 18096.230 TCFD,P$6 4554.556 TSC~.PS6 1793'705 INFD,P$6 352:815 TENS,PS6 0.000 " 35.505 1.756 35034.008 4536.698 865.000 49.021 1,904 21805.332 22]9.243 770.000 **** FIbE TRAiLE~ **** FILE NAME ~ EDI? .013 SERVICE i FLIC VERSION : OO1CO! DATK { 95/0~/10 MAX REC SIZE ~ 1024 FILK TYPE : LO LAST FIL~ ~ DATE ~ 95/02/I0 O~IGIN I FLIC TAPE NAME ~ 94395 CONTINUATION ~ : ~ PREVIOUS TAPE : CO~ENT : ARCO ALASKA INC, DS 4-19, PRUDHOE BAY ,50'029-2!791-00 ~IS FaDe Verification 51$tinQ ;¢hlt)mberger Alaska ¢omputinq Center 10-FEB-19g5 11:42 PAGE: 7! D~T~ : 95/02/10 R~EL NA~E : 94]95 CONTINUATION # : P~EVIOUS ~E~5 COMMENT : ARCO ALASKA INC, DS 4-19, P~UDHOE BAY ,50-029-2~791-00 RECEIVED APR 2 1 1995 Alaska 0il & Gas Cons. Commission ~chorage ;cblt]mberqer Alaska Co.:F. ut J[)c~ Cer~ter' CA$['D HOI..,F: i'.!IPEI:if.~E bOGS T~PF CRE~TIFDN DATFi: bOGGING EiNGTNEEF: FSb: Fwl,: F: !,~ E; V A T I F} N ( F T F'.R 0 ?i ~ 8 DERRICK FLOOR: WFbL CASING RECI'.)RU D,S. 4-19 500292179!.00 Ab:CO ALASEAw 5-APF:-g5 9b!O~ D. 'VEt~'HA 26 i.. ~0. O0 59,00 21.0o SIZE (l,,~' . ............... 9.625 6992,0 47,00 ~,000 ~993,0 26,00 5,500 31!0,0 t7,00 C!.!RVE SHIFT !)/~TA - Abb PASSE',5 TO STAik~DARD(~;~FASUR~;D D~;DTH) IS Ta~e Verf. f~cat~[on bist!n~ 5-$.FR-1995 chlumt~er.ger Alaska com~uttnO Cer~ter .......... I?OI~I. VALb. ~,T hSM[,.[ ~ E D~;PTd CC, CH $IGI! 6061 ,$ 6060,0 6053. S 6053,5 ~039.5 603n. 5 603~. q 6031.0 b022.5 6021.0 OqO 3.5 ~000.5 509 ~.. 0 5~89, n 5o6S. o 5063.5 5935.5 5934,0 5026,5 5925.5 5~6a.5 5~bl,5 5~5~ .5 5~50.5 5~4q, 5 58,1~. 5 5~15,5 5~15,o 5~14,5 5~ !,0,5 ' 5~ 1. I, 0 57~1.5 57SI.0 577 !. 5 577!.. 0 5760,5 5759.5 5744. () 5740,5 573~, 5 5738,0 5700,5 569~, 5 5672,0 5670. 5 563q, 0 56.~7, n 5633,0 5632,5 5603,0 560t, 5 cS" ... 0 5571 5 ~ ~.'~, , . 5555,5 555.~. 5 5529,0 5527.0 549e, 5 549~, 0 9~, n 5.~92.0 5a76.5 5476.5 5455' 5 5455.0 5442.0 5441.0 5382. $ 5382.0 5382.0 5382.0 5360,5 5 '! 6 ~), 5 U 1',! ,5 H I F T ~:: P 12:01 !.) F: p T ?i .......... PAGE: IS Tar, Ch 1u m~, ergmr A. laska Com~:uttno Cemt:er 5349, %3!-.~. n 531~.n S 30 !. 5 5'~01.0 593~q.5 5~39.0 5~ 1 o. 0 5~09.5 520~.5 87 n 5!.~2.0 5! 5~21 .~ 5~21.0 5 ~ 04, 507n,5 507g.o 50~.5 5035.5 5011,5 5ell ,0 5~Oq, 5 5007.0 4°5'4, ~ 4c~54.0 4 9 2 ?. 0 4P6~,0 4958.0 4857 . 0 482g,5 482~.5 470g.5 473g,0 ,47 !. g. 0 471 g , 0 4675,0 464~, 0 4647,5 4. 53 '7.5 4535.0 4522, 4505. 4456.0 4454.0 4a55.5 .4281, r'~ 425~.0 425!,5 42 ] :1..5 4231.0 4222,~ 4220.5 ,4208,0 4205.0 1.9n, ,. . 60,5 4!.59,0 4 ! 60, 4!.45,5 4145,5 .4059"')'-'!'5, 405~,5 4040, (.) 4037 , 5 402.3.0 ~002,0 400! .0 3990,5 395g, 5 305f., 5 3955.0 5~57.5 53{)1.5 5209.5 51.56.0 5104.5 5002.5 -~g5a.o 4926.0 4~21,5 4867,5 4~2~,5 q76~.0 4675,0 4504,5 4280,5 ,~220.5 4!.59.0 4057.0 402~,0 399~.5 5-APR-!, 995 !2:01 PAGE: IS ?a~e verification Listin~ chlumber~]or .~!as<a Co.mpLlt.!.n~ Center 3~. ! 0 . e 39 385].0 3~5~.5 3~27,5 3~26.0 3~].1 ,5 3~!_0.5 3~ ! ~ . 0 3796,0 3794.5 3737,5 3720,~ 3710.5 3&79.5 36g0,0 '367 ~ . 5 3677 . 5 3667 . ~ 3667 . 3&06,5 3604.5 3549.5 35.49,5 3537,0 3534.5 522,5 3~2a.0 ~22.0 3520. 3497,0 3~95,5 3~86.5 3487,0 ~00,0 9~,5 100.5 12:01 TAPE T~E RAW FI. LES ~:~F: ~'~D~::~ A.V~IL~BI..~; TO BOTH ARCO 'I:~E DFPTH C:['~RPECTI9~5 $[.:~/:::~t~'.~ ;~[~!:.~VE F~EFI,,ECZ CASED C 5EL HOI',~E S,I:GYi TO OPEN ?iOLE GR · .l~n C~PF~ ~al~E GR ~',D .'~ ...... PAGE: DITE : 95104/ ~'~5X RF, C SIZE : !024 F' I L F LAST FI!~E 5-~PP--~ 995 Penth shifted an6 clipped c~]rves fei' each Dans in separate files. Tr~T~ 6095. o 34~ 6,0 CI..~VE, S~IFT Da. Tn - ~"~,88 Tt~ PASS(Y.~iASUD~ ~"B:~'~.~PF..$: THIS F'J]T~[: CON'PhJr,i~: PASS ~! OF '].'H~; i'DTP, b~f~ PASS TO P!~S8 S~'~IFI',?- ~.~E;PE APPblF[:, TO T~!8 f.)~,T~. PAGE: 5 Well Name &PI Serial Number Field Location Section Township County State or Province Nation witness ~ame Service Order N%~mber PermaDent datQm Elevation o~ Permanen~ Datum Loq ~easured From Above Permanent Datum Elevation o~ ~;levati. on o~ oerr c~ F1 or EIeva%lon of Ground Bevel Total Demt~ - Driller Total Deot~ - Lo~er ~'er ~ f i cat,!, or'~ Alaska Co~,[~tir'~,q Center. P~GE: 6 gottom 34~6o TOp Eo~ bnRAx ~;F:AWATEP Drilling Fluid Type 2232 17-h~k-95 Time LogGer at Bottom SIG'v S.i~r~a r~'~outrr, n Car:~ture Cross '].'PH1 '1'[:,~ Porosity & ! [?,w Corrected Borehole TPAv ~ation Total ;'~ear to Far counts T.~C~ Total Selected Counts - ~4ear Detector TSC~' Total, Sel. ecten Counts - ~ar r)etector i~c~r', Ir, elastic count rate - near detector !~Fr~ !r~e!astic count rate - far detector G~C~ G~:~mr"~a RaV in Cas~,nq G~ ~P!-Correcl':ed Gamma PaY ** PATA ~O,R~AT SPFCJ'FICAT,.I'{']~I pEC(~RD ** ,.IS ~rar, e VerifJcatio~ ),istinn ;chlu~:berqer ~}..a.~a Ct.)~put.~no Centor 5-APR-!g95 PAGE: ** S~:.;T TYP 8~; TDT~ C;.~ 506 TSC~: 7'DTP CPS ~U6 T~C~ TDTP C~S 506 0 ! ~ 1 4 6a 0000000000 ') i ! I a 68 0000000000 t) 1 ! 1 4 68 0000000000 0 1 !. ! 4 68 0000000000 0 1 1 I 4 68 0000000000 o ! 1 1 4 68 0000000000 0 1 ! I a 68 0000000000 ** [)hq'h ** 6lqC> 1}~.'.{~~ giG".* '.t'P'"P -9'qo 25n 'vPHI,"I'[)T.p 999,250 ' ' '~ :; · · .~ ..... o , ' . ~ , -999.7Z5() TSC,J.TDTP -g99.250 TSCF.'ITDTD -999.250 -q¢?9,').!~4() ~P..C.. }i, TI)TP -ggo.2bO GN, :~(~S 49.70g SIS~.TDTP IMND,TDTP 8!BH.TOTP !NND.TDTP -999.250 -999.250 -999.250 -999.250 t,! ;': ~4 E E C S TYPE :Cblt!mberfler AlasKa Co~:~[':Ut:tr!o r'.e~t, er 5092,0 f~, 0 !:~ 5,5 6047, S 604.4,0 t,~O~s 3 . 5 % (2 i 6.5 & 0 ! 0 , 0 5 ~ '7 6, n 5 ~ 31.0 5732,n 57 2. 4,0 57(<0,5 5670.5 5635.0 and c.!.t.p~ed cklrves 2 each pass 4990,0 ~qgo,o b06S.$ 6046,0 6043,0 6042 (5031,0 6{:07,5 6 0 {) 4 593! 5~79,5 5a5~.5 5~56.5 5~30.0 57!~7.0 5759.5 575~.0 5730,0 57~3.5 5669 5634,0 5622,0 56!2,0 lpg.; P T H ) U ~1,5 ,q 1.1= T K D in separate files. L)EPT ii .......... .ch].t~m~erc:er .4!asKa CorrD..~.t.!nr3 CenteF PAGE: 5~F7.5 5585.5 5537,0 5~21. ~ 552n. 0 5474,0 547].0 54t 6. ~ 5466, 5a5~,5 ~455.0 54eP. (~ 5441 .0 5440,5 5427,0 5a28.0 5424,~ 542~.5 5416,0 541 ~.0 5J193.5 5~94.0 5.~F2. (~ S 782. n ~.~'1n 5 5357.0 5t57.0 5333.0 5332.5 531!.0 531~.5 527~.5 5273,0 525~,5 5~56,5 5236.5 523~. 0 521~.0 5219.0 52 10.0 b?(')~. 5 5~ 82.0 5! 5t63.S 5~62,0 51 5~,0 5t55.n 5~55,0 5!..52,o 146.0 5!.43,5 !3! .5 5t 3o.n 5i. 21.0 512n.5 ~t lC)'6 5! 17.~ 510 o, 5 51 (?~. 0 5104. 5090,0 509n 507~. 5 5n7~. 5051.5 5o50,5 5036.5 5035,5 503-~. 5 5035, 5012,~ n 5007.5 500~.50(;'9' 5000.0 4096 0 4095,5 4994: 0 4994,5 409~,5 4992,5 ! 00,0 99 %~HIS F,![~: COF~Talf;$ PASb ~2 OF IH[~: TDTP. CC.,R~'E:CTI(7~kS ~'~.-.!L}t~.~,! AF,~(.'ivE i::',EFI.,,.F]CT PASS .DE:PTH PASS AlasKa Comk't~tinc Center !2:.01 PAGE: 10 Fr 0~0~' FSL 5 [7 C 'F 2 6 SI'A! ALASK~ ~,,; ~ T l USA 500202 L~F FELLY bl.iSH lNG A t~ D F T b 0, EDF ?T 59, T~)) ~'!' 6000. TI>L V 'I' b 10o. }:~ I, :l ~T 6096. T~ I F T 3 4 ~ ~. q, LA~ 2232 ! Well h~ame AP1 Serial Nun)bet Field Location Section Township Range County State or Province ~ation ~itness Service Order ~um~er Parliament' datum ~levatlon of Permanent Datum Log ~easured From AbOVe Permanent Datum Elevation of Kelly Bt~shinq E!.evat~on of Derrick Elevat].on of Ground Level Total Depth - Dr~.ller Total DePth - boqger Bottom bog Interval Lo~ Interval TO~lilno FlUid Tyoe Time Log~er at "I'A~I,t< T?PFt : CU,r-,'V '~:~:'''v~ .....~;;t~ ''' .......... '''' ....... ''' ............. ''''' $IG~ Siama (~eutron Capture Cross Section) TPHT TDT Porosity ec~.ed ~oreho,le SI, oma 7PAT ~ation Total ~iear t:o ~ar counts T$C~<! Total Selected Counts - ~e~r Detector T$CF Total ~e!ecte~ Counts - Far Detector l~p~O t~e!astic count rate -near detector INF'D Inelastic count rate - far detector G~C" Gamma Ray l.n Casinq ;chlUmt:~rq~r A!.aSK.a ComP,~tinc!. Center PAGE: 11 ** nATA i~'rtk"'" . Fi,' .... ,:AT SP ;,,TFIChT!:]N R~:CORi) ** ** SET TYP~£ S 1 (; ~,'~ 'r;)'17 P C ;! 5 o 62 TPH! TDTP PU-S 5062 T~AT TUTP 5062 T 5 C ~ T D T P C P S 5 <.) 62 TS(]r ?DTP CPS 5062 I ~ ~,: r,'r D T P C P $ 5 0 6 '2 !~F9 T[)TP CPS 5962 (;Pq~ TDTP GAPI 5062 2 i t 4 6~ 0000000000 ? I I 4 68 o0o000000o 2 1 t 4 68 0000000000 ? !l [ 4 6~ 2 1 1 4 68 0000000000 2 1 I 4 6~ 0o00000000 2 ! I 4 68 0000000000 2 1 1 4 68 00o0000000 2 i 1 4 68 00000fi0000 2 1 ! 4 68 0000000000 ........ 'rhrp 52 687 5058.778 'rsCF.rp:ro !589:104 : ~: I ' ~' . . .. ,. i. .,~ .~ o ..... .- ~.~ .~ . . INFP TDTP -999 '2q~ ....... $ I B I4. T D T P i~roD. TDTP 48.030 !907.325 -999 250 -999~250 ~IS Tane Ver~.fi, catfon l,istinn. ,cblufnho_rq~r Alaska Co~:;:utiao Center PAGE: 12 V~TRSIi)d : r)9! C()I D~T~' : '.}5t~) ~x P~TC 5TZE : lo24 FILE T~DE : I.., ~, S T F'I I,E F'I'LF ~!EA!)E E~.ITgO De~th chifted and clip~ed cttrves for each oass in separate fi. les. 3 6096,0 3493.0 349~,0 R ~ 7 ~ 9 ~ f 606~, 0 6046,0 ~5042.0 0o33.0 .chlumher(~er A]aSKR COm.n~t.~.nrl Cente.r 6 C, 3 '2. (..' t; o 30.0 599i), 5 5989.0 b9~c~, 0 5q~1 ,0 5974,0 5~'!3,5 5o.4,~. 5 5945.5 5~9].5 ~g94,g 5~57.0 5~55.S 5~56.5 5~ 0~, 0 5~()g, 0 57 4~, ~ q740. ~ 573q. 5 5730.0 570q. ~ 5700.5 570~, 0 5~99 . 5 567 l,, 5 5670.5 5~ . 5 5&34.0 5~{ 3:2,5 563! .0 ~()i. ~ 5601.0 59q, 5 5597.5 574. g 5574.0 556'7. (~ ~5565, ~ 5~4S. 5 554~, 0 54.99. ~4 549~. 0 S.~76, n 5476.5 5'!55' 0 5455,0 5~3.,1.5 5434.0 54!.7,n 54!2.0 ~41)~ 5 5409,5 538'~' 0 5382.0 537q. 5 537q. ~ 5?'13.5 5374.5 534-1.9 53:%2,0 53.4~, 5 5332,5 533~.5 " q 5301,5 53 V 1, 5790.5 5~9:). o 5285. o 57~5.0 5271.o 5270.5 5~6S. 0 5~65.5 5!,81,5 5!56.0 5155.5 5 ! ]4.0 5!. 32.5 51~.5 5120.5 507 ~, ~ 5070. n (') 5078, ~ 507g, ...... 995 !2:01 PAGEt 13 ,IS ~a~e Veri. f. Ication [,istin~ ichlumber~er AlasKa Com[.~ut!nq Cent~.r PAGE: 14 5036,0 5008.0 4qgl.o 4967.9 4966.5 4951,0 4927.5 4987.0 4-g~5.5 4~61.0 4~59.5 4800,5 ~767,5 4764 0 4764,a 4721..n 4700,0 4679,0 0 4644,5 46~5,~ 4~0~ q603, 4564,0 456~.0 4a86.0 4484.0 44.55,5 4450,5 4:4:47.5 4407.5 439q.5 439~.0 435a,~ 4356.5 4~52.0 4276,0 427~,5 4~53.0 4251,5 4~I7,5 4~15.5 4~9~0 41S~.5 4~77,0 4~7~,5 4~60,5 .4159,5 4 r~ 85,0 40?4,0 401~,~ ...... 400?° 3~5~o~ 3954,5 3952,n ~q37,5 39~5 0 3~56, ............ 3840,5 3847.5 381.!,0 3S09o0 5035.5 4997.5 4955.0 4q21.0 4867.5 4800.5 4767.5 4720,5 4699,0 4679,0 467~ 5 · ~ 4&57.5 4520.5 4453.0 4406,5 4346.5 4220.5 ~137.5 4083.0 40(i7.0 3957,0 IS 7ane verif.tcat!.on t;istl, na cblumberger Alaska Co.mputiD~ Center 3807,5 3~.03,5 3766., o. 3764,0 3721,5 37!q,5 3677, ~ _~75.0 3633,0 3629,0 3575,5 3~71 ,0 3.556,% 3543,5 3540,5 3536,0 3539,0 3504, C 3501.0 350~,~ 3497,5 3a9o,5 lO0,n 96,5 101,0 5-APR-!995 I2:0! ~] OF TNE TnTP. T~4E DEPTH }'~FFLEC~t PASS ~3 G~CH TO PASS .PASS ~! SId~, ALL OTHER TDTp ThE #1 PAGEt 15 F ~i P R U D ~'"~ Ap I2 ~:; h ~-02q-21791.-00 FI. (;9o~' S~C'r 2 6 R ~ ~'~C ! 5 E CO{J ~: t<, ORTh L~I~OPE ~TAT A[~ASF: h !,~FTM KELLY bUot.,ING<* J , A P 1.2 F T 6 ~. EKB FT 60, EDF' ~'T 59. E~I,, FT 2 1 , TD!} F'T 6900, TU!,~ FT b I t)O. BLI P~!'' b096. TLI F'T 34~6. DVT Ff~RA~ TI.,A~ 2232 Companv Name Field Name Well ~ame ApI Serial Number Field Location Section Township Range County State or ~rovlnce Nation Witness Name Service order NumSer Permanent datum Elevation of Permanent Datum Loq ~easured From Above Permanent Uatum Elevation of Kelly BuShing Elevation of Derrick Floor E!evatlon of Ground Total DeDt. h - Drl. ller Total Depth - Lo~er ~ottom l,oq imterval ToD Log Interval Drillin~ F].,u].d Tv~e Time Lo~oer at BO tom ~IS Tar, e Vori~icetion I~istJ..nq 5-APR-19Q5 Tg~5IE TYPl;: '. CUPV $!Gu Siema (;',~eutron Capture Cross sectior~) TPH1 TDT Porosity S~B~~ Correcte~ ~orenole S~qma T~AT P~tlnD Total ~.~ear to Far counts ISC? Tott~l Selected Cot]mrs - ~,;ear Detector T~Cy~ Total Selected Counts - ~ar Detector I~'~ Jmel. astic count rate - near detector INF~ Inelastic co,tnt rate - fmr Oet~ctor (;~C~ Camna ~.ay ~n Casinq PAGE: 16 ] 6 6 3 73 4O 4 6~ 8 68 0,5 9 65 13 66 i4 65 FT 1.6 66 SlG~; TDTP C~~ 506202 nO 000 O0 0 3 ! I 4 b8 0000000000 TP}t!' Ti)rap PU-S '5('(:~02 O0 UO0 O0 0 3 ! 1 4 68 0000000000 51 a H T [; T P C U ~ u e~ 202 {') 0 000 00 (" 3 1 t 4 68 0000 (:, 00000 T ~ h V q' 1;: T P S 06202 00 t,) (':, 000 O 't 1 I 4 68 00 O O 000000 TSC~ TI:Ti:~ CPS 50a202 OC, 900 et) 0 3 ! 'l 4 ba 0000000000 TSCr T['TF CPb 506202 O0 0()0 00 0 3 1 i 4 (78 0000(~O0000 ~chlu~'~ber(:~r A!asK.~ Co~pntin~ Center 5-A~R-1995 l~:nl PAGE: 17 I~F~ ml)mP C¢5 5(;~2o2 OO 000 00 o 3 i i 4 6~ 00~O0O0000 (;~Cu T!>TP G.~F'T 50(,202 ~0 0(~C, n0 O 3 1 I 4 68 0000000000 [.:FPT. 6{iio6. (;00 SIC:<. !'DI'P i 6.0 'l'.~A'r. T!~n,'P 2.02', TSC~'.~. TDTP 5762. 597 -999.250 T P }4 !. T D T .P TPB I. TDTP TSCk'. 44.490 $I~.TDTP 106o.739 ~999.250 .,SIB[~.T[)'~P -q99.250 I ~,,bD. TDTP 47,701 1807,128 -999,250 -999,250 Per~t.h shifted ar:~d c,!Ipr)ed curves for each pass i.n ser)arate fi. les, .,IS war~e Verfficstion l,isti.nc? ;ch!u~pbe.roor A].a~K~ ComputIna Center PAGE: 18 START ..... ~., 4333.0 ~032.0 6000,5 OOO5,O 5oe!,o 5g45,$ 5n3~.0 5°34.5 5883.5 5~53,0 5811,0 786 5 q 7 39,0 69~,~ 5635,5 560~,5 5585,5 5581,0 ~573 0 556~,.. 552?,0 5456.0 5435,5 5333,5 5305,5 b057.0 t: 03 r~ · 5 504~ .5 5g3a. S 5~a2.5 5~21,0 569~.5 5fi70.5 5571.5 5455,0 543 ,~. 0 5407.5 533~.5 5303.5 5285.5 bg60.5 5Q44.5 5852,0 5821.5 5~Ii,O 5786,5 5774,0 565g.5 5634,0 5601,0 55t!3.5 55g0,0 5565.5 551. q,5 549~o0 5446.0 53!5.0 Db:pl'H } L' t,;b H I F TF, Io [:, l~ t:: T i.i .......... chl. t.l~r~berqer Alaska Co~Putir~9 Center PAGe: 19 5!91.9 5~77.5 5157.5 5146.5 ~12~ 50~0.5 5072.o 5048.5 5041,5 5024.~ 5013,0 499~,9 ~99S,S 4~77,0 4~41.0 ~n025 ~.74~, 47~6,0 469 ], 0 4:646,5 463~,a 4604,5 ,~536, 4524,0 45!7,0 4459 0 4456 5 4423 5 4410,5 440?,0 4377.0 4360.5 !OO,O 5~76.5 5!43,5 5079.0 50~1.5 4995.5 4949.0 4957.0 ~g3g.5 4745.5 472~,5 4644.5 577~o5 5247.5 51a9.5 5155.5 5!.~2.5 5070,5 5046.5 5039.0 502~,0 4994.5 4q53.n 4o40,o 4926.0 4950, a 4690.0 ~67Q.0 4&65,5 4629.o 4599,5 4535.5 4533.0 4:520,5 45t5,0 4484.0 4454.0 4453,5 4441..5 4428.5 4~41~.5 4406.0 439~,0 4374,5 4356.5 435~.0 96,0 97,5 ~SF: P~SS ~1. (~P:CH AND ~[.)F. AX PAS, S ~1 ~IG~.'~ ~f.~ ~ASE PASS ~1 SiCh~. ~LL CT~E~ TPTP C!.j~V~:S ~;E[<E CAR~IFt~ ?!TH THF. PAGE: 20 CN ARCO aLaSkA, I~C:. Company F~) F~bPHPE. [~.Y Field ~a~e ~pi:~.~ 5~-~29 21791-00 API Serial ~umber FL 090¢' t;~Sl., ~. 0255' r~[., Field Location Sr{C~ ~6 Section P~<d iSE Range CcLJ~ ~RTh ~;I.[)P E: County 5'r.~,.'r ALASka, State or Province ~ ~,T'I USA Nat i on sficr 5o62o2 service Order Number P~AT' ~:;EA~,~ Si,a [,~VE.:[ Permanent datum ~:¢0 ~"IY O. Elevatio~ of Per~anent Datu~ LuF· KELLY .i:~,USHING Loo ~easureO From AP!) F'I": 60, AboVe Permanent Datum E~.k~ ~"I' 60. Elevation of Kell~ Bushlmq Elna" ~'T 59, Elevation of Oerr ck ~loor E~[., ~"r 2! Elevat.~on of Ground bevel TPP F'i'~ ~>g~O. Total. Depth - Drll..!er TeL FT 6100. Total Death - [,o~ger BLI ri 6096. Bottor~ Log Interval TLI FT 34~6. TOD Lo~ Interval [.)tT bE1RAX ~ ~ATER Drll,.ll.n~ FI. uJ, O Type TLAn 2232 l'/-N~R.-95 'Time boqoer at 8Ottom T~BLE "i;YPE : CU~V OeDth SIOma (Neutron Capture Cross section) TnT Porosity Corrected Borehol, e Sjqma Total seiected Cou~ts - t,~ear [)erector Total Selected Counts - Far petector Inelastic couat rate - near detector Inelastic cou~t rate - ~ar detect:or 12 Tape Verificatt. on I,isttn~ cblumberqer AlasKa Co.moutinq Center 5-APR-1995 12:01 21 i . 9 12 1 t. !.4 1..5 I..6 0 66 73 66 75 65 66 6~ 66 65 66.' 66 66 n 4 U 1 0.5 2 5 68 ..1. 1 [! P, D ....*.7 P # b DEPm FT 50 ~0206 BIG~ TD'rP CU 506202 '!~PHI ~vDTp PU-8506202 O0 SIB~4 Tl'.,~:r P C!~ 5O6202 O0 TPaT T!.3TP 506'202 O0 T $ C ~',~ 'r D :'r P C ¢ S 506202 00 TSCF TDTP CPS 506202 I N ~,; D Ti)TP C~ 506~02 90 G'~C~ TDTP GAPT 506202 O0 TYPF7 C[.,A~..S MOD N~J~6 Sa~P E:[.,EJM CODE (HEX) ;"0;'';.0 ..... ;'''X. .... ; ..... ~ .... oo0 OO 0 4 1 I 4 68 00o0000000 {)00 OO 0 4 I 1 4 68 0000000000 000 O0 0 4 1 i 4 68 OOOOOOO000 O00 O0 0 4 ! 1 4 68 0000000000 000 O0 0 4 1 I 4 68 0000000000 000 O0 0 4 I I 4 68 0000000000 000 O0 0 4 l i 4 68 0000000000 000 O0 0 4 ! i 4 68 0000000000 ,.IS Tar~e Verification t:is'tina ;chlU'~berger ~lasKrl Com,~t!ti. nq Cer~ter 5-a~':~R-1995 [2:(')1. PAGE: 22 TPH!. TSCF. {'DTP 4B.949 10u5.~87 -999 250 -999[~50 iNND.TDTP ,5I BH. TDTP I N~',D.'rDTP 121.078 2060,386 -999,250 -999.250 clipped cu. rve$ S'I h 'RT DEPTF! ";l; ...... for each oass DATA - PASS TO PASS(~i~:ASL~Ri~';D Ci~F:V!~ FOR S~IFTS in separate files, ,IS Tape verification .chlumherger A. las<a Comput..~n~ Center 5-AP~-199b !~:ot PAGE: 23 6057.0 b029.0 6n13,o %959,5 b95O,fi 5942.© 5935,0 5~g7,5 5~57,n 5~27,o 5~!5.S 5~07 5 57~6~5 5774.0 5753.0 573~.5 5699,5 5&71.~ 5603,0 55SP,5 5575,0 5'40~,5 5.}67.0 b36~,0 5295.5 0 5~24,a 5136~5 5135,0 5O74 0 5037,0 5034,5 50]~,5 500:~.0 ~059.5 ~056.5 60~7,0 6010,0 6000.5 594~,5 5921.5 5601,5 5585.5 5455.0 5407.5 5367,0 5332.5 52P5,0 517!.0 5143.5 5132.5 5t07.0 5074,0 5035,5 5q5~.5 5~40.5 5~34.0 5887.~ 5~56.n 5~27.q 5757,0 5773.5 5752.(~ 573~,0 5600.5 5586o5 5574.0 5506,5 54~7,0 5472,5 54,4-6.5 5301.5 5278,5 5t. 35,5 b073,5 5O35.5 5011.0 4994.5 15 T~po ver~fi¢~tio~ I,~.sti~O 5-n[~-1995 12:01 PAGE: 24 ,109 ~, 0 4:990.5 ~c)55,5 405],5 4950,5 4q53,0 4~23.5 402 !. 0 4022.5 4921 .5 4~71.5 4~70.n 476?,5 4761..o 475a.0 47 ~ 8,0 4726, a ~673,5 4672,5 4656.0 4654,5 4&46,~ 4644,5 4603,5 4600,5 4567,5 4565,~ 4~6~,5 4561,5 45 I. ~. 5 451 6. O 45!6.5 4515.5 4506,5 ~5()4,5 4504.5 4500,5 4.4.86.5 447R. O 4475.0 4465.0 4462, O 4a45.0 4.444, 44~2,5 4441,5 4436 5 4.'~33, 441.6,5 4:415,0 440 [~, 0 ~4.06,0 4400, O 439~, 0 392, ~ 4394,0 .357 ~ 0 4 35~. 0 ! (:,':~. 0 97.0 101. o FiLE C[~i'~TA,[i!,iS Bt'.!~A× PAS5 ~2 OF T~'~f~,.; TDTP. THE DEPTH COf~ECT'IO~,,~5 Suf~w[~ AF~[.~vE: }'~EFL~iCT ~'~O[~AX P,ASb ~2 GRCH TO Cix'], AI.~L OFHE[:~ TI) TP CI..tRVES W~jpE CAR~I[:D ~iTH T.HF TABLE T YP~t : C0~,:5 cblt]mber¢~e:r AlasKa ¢'omp:]tJh¢1 Center PAGE: 25 50-02~. -2 179! t~908' f'SL ~. 0255' 26 15L ki S A 0, f, 0. 5~. 2 1, t, 1 t~ 0. 6096. 3 4 ~ 6. ~:3 {'1 ~' ~ X ~3 ~.; ~ ~: A T E 2:232 I '/-P~AR-95 ~ell Name lP! Serial Number Field I,ocation Section Township Ranqe County State or Province Nation witness,~ame Service Order Number Permanent datum Elevatlon of Permanent Datum l~oo ~easured From Above Permanent Datum ~:levatlon of Kelly Bushing FlevatloD of Derrick Floor Elevatlon of Ground Level Total DeDth -Drlller Total, DePth - Logger Bottom Log Interval ToD LoG Interval Drll!ing Fluld Type Time Logoer at Bottom bEF; f [')F Tp r~er)t.h S'l'O~ $.ior~':a (i':,~utron Capture (:ross Secti. ot'~) q,',p~ 1 TO~.' Porosity STEP Corrected f:!oreho ], e Tn~T nation Total ~'..:ear t'o Far cour~ts q'SC~: Tot'.al Sel. ect.~d Counts - ~',~ear !..>etector . ~.ctal ~elected Counts Far Detector ];Nt,,~D 'lnel. ast~c count r,;]t,e - near detector 'INP'D Inelastic count rate - ~ar detector (;PCP ~amma '~av In Cas I$ ~:ar~e verificatior) !.i. stinq cl~l,a.m~erq~r alaska Computin~ Center 5--AF~-1o95 1~:01 ** PAT;'~ F'rlRHAT ,'~PECTF!CATI{)N ~!ECL}R!') *~ mm~mmm~..mmmmm~m~mmm..mm~mmm~ ' ";"'~ .... ~T;'.:,";,;'~"~ .............. '"""' .......................... '" ....... ' , ~A~ S V U ~it;~' C . PI bPI APl bPI VI t:;~l ~J!.,]~;:~ NUMB ,~IZF REPR I) E P T F ' 5 (' i~ !. 6 a 0 0 ...... , , Ct~ 5062n2 00 0("o O0 0 ~ i I 4 08 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 26 T P I,! I. '? P T P ? 5 C F. T D 'I' P TPH I. T DTP T$CF'. TI)T? 38.965 $!bH.TDTP 997.657 INND.TDTP -990 250 $I B!,,!. TDTP -999;:~50 iNND 106.715 23~9.955 -999 . r. 2 a 0 -999;250 IS ?~C~ vo_r~:.!.cat~.~rOn T:istinc~ chlumberqer Alaska romputin~ Center 5-APR-199% !2:01 PAGE: 27 r.~eDth shifted and clipped curves for each pass in separate Ck r' ' T[;'TP 6003.0 519f;. 0 ~.$~.;[,,I*iE CIiRVE F'Ok SHI..FTS LOV, 6 CURVF C[)DE: GRCH .......... gu, U IVALE-aT b t% ;;CH I I?'TED ¢hSEL. Ih!E DF/PTH ¢~'CH 6003 ;;. ;':;''''''', ;;;;;:; '''"'''88,~,8.. ,) 5093,5 5993,5 508~,5 59~7.5 5965,0 5963,5 5964.5 596!.,5 ~ 5933,5 ~935,~ 5034,0 :) 93 5. 5o2n,5 ~9~q q 5~88,R 5984,5 5882,0 5~60,5 5857,5 TDTP chlumberger AI. aSK~ ComputInQ Center 5-AFR-1995 12:01 PAGE: 28 5~58,0 5~12,5 5~11.0 5~1~.~ 5~11,0 5~07.5 5RO7.5 57~7,0 57S7.0 5774.5 5773.5 5761.0 5759.5 575~,0 575~.0 57~g,5 573R,0 573?,5 ~737 n 567!.9 5669°0 56~4,0 56(~1,5 557~,5 5570,0 556~,5 5565.0 5474,5 5471,5 5468.5 5466..5 5~57.~ 5435,5 54.34,0 5~5,O 54.1~,5 54~ ~: 5~O9,5 5~09'~ 5~Sl,5 5379,0 5~75,0 5374,5 5368,0 5~67,0 5:~35.0 5295.5 5791..5 5290.0 5~74.0 5~73.0 527~ 5 ~ ~'.' .... z~ 5 5256.0 5~5.5 5225.¢~ S~ 0 520e.5 5706,5 5205,0 ~00,0 97,5 9~,5 IS Ta~e ver~ficat~o~ chlUmherqmr Alaska Cor. putiBo Center 5'APR-1995 12:01 1'~! i'~ ~ VA I.,{~ D~]F' I .......................................C~,~ ~;~3~'X~r~[~7'7~7 ............................................. Company Name s,, ~,; [).b. 4-1.9 APl~.' 50-02q-2 ! 79 !-mt; FT, SF(~ 8~'A~ AI,ASF A n ;:', ~ '~ ~, [.~ ~ E~!. x a~S'~ING APD ~'[[' 60, ~: G L ~ T 2 1 , T l?) I) ~ ir 6 9 0 0. I'LL PT 6 1 oO. ILt DPT Well Name AP1 Serial ~umber Field Location Section Township County State or Province Nation witness ~;ame Service Order Number Permanent datum Elevation of Permanent Datum Log ~easured From Above Permanent Datum Elevation of Kelly Bushino Elevation of Derric~ Floor ~!evatlon of Ground Level Total DePth - Driller Total Depth - booger Bottom Log Interval TO~ Log Interval Drilling Fluid Type Time bogoer at aotto~ DF. PT D~t,h 8Ig~ Siql~',a f!,,,eutron capture cross 8ectior~) TP?{? ?DY POrOSity FtBF~ Corrected Borehole 8i<.~ma TRA~' Ratio~ Total ~"~ear to Far counts ]~scN Tota! ~..eiecteO. ~' " ,.ear l)etector T~CF Total. Se!ect,~d Counts - Far Detector INN[: ?nelastic count rate - near detector INFr. Inelastic count rate - far detector GRC~ Camma Ray In Casino ,IS Ta~e Verification I,istiBq ,c~!un, herq!~r AlaSka Computino Center PAGE: 30 ** '"ATA FOR!';IAT SPFCIFICATI{)i't ~'L;CtiNL, ** .............D~:P,' ;T ........................................... 506202 O0 00{) O0 ~ 6 I ; ..... ; ..... ;;'''';;;;;;;;;;'' S!'G~ ['¢ !.., T P CU 506202 O0 000 O0 0 6 1 t 4 68 0000000000 TPt"~? q'L,'r? PU-S 506202 00 f) O0 O0 8 '.Y !:? P q'DTP C!~ 506202 00 000 00 TRAT Ti)'FP 506202 00 000 00 TSC~.~ TOTP CPS 506202 00 ~)00 00 TSC~' 'rOTP CPS 5,.)6~02 00 0o0 0O I N ?,: f~ T[:)T P CP2 506202 0(~ 000 O0 i ~ F D T [:~'r P C P $ 506202 00 00 O 00 GPCP T.PTP G~P~ 5<;6202 00 00() 00 0 6 I i 4 68 0000000000 0 6 !, ! 4 68 0000000000 0 6 ! I 4 62 0000000000 ~ 6 1 i 4 68 0000000000 0 6 1. I 4 6a 0000000000 0 6 I I 4 6~ 0Oo0000000 0 6 ! ! 4 68 000000000o ~ 6 1 I 4 68 0000000000 1 !05.455 TSCF.TOTr~ -999.~50 -999. 250 TPH !. Tf>TP -999.250 TSCF'. J:DTt~ 5 o. 90 6 TDTP 22.764; 59~.070 IgND.7uTP -99~ ~50 SIBH.~DTP -999: 250 INND. TOTP 131,296 229 .000 -999.250 -999.250 ,IS ~d~e ver!~cation ~ch!u~r, berqer ~l.~.)ska Corn?ut inc~ Cent. er P~GE~ 31 FILr ~,)U~,,!BE!R: 7 r~e~t:h shifted and c!.i;:',~ed curves ~oT' each ~ass in separate ,files. ST~.~T 6006 STOP D }7 P T ~.,{ 5497,0 .......... E;Qt)IVA[,.E~T U!qSMIF'TED DEPTU,------ .... 5993,0 5993,5 5q74,o 5073,5 5944,5 5944,5 5041,0 5q40,0 5034'0 5933.5 5930,5 5034,0 ~928 r) 592~.0 ~,~ . ~ . . - 5q21,0 5024,5 $907,5 5q05,5 chlum~,erger AlasKa ComPutir~q Center 5~33,5 5785.5 5773.5 b75] ,5 5737,5 5634.5 5621 .0 5573,0 5571 .0 5550.5 55'23.0 5520,5 I 0 fl 0 5~.~ 5R5a.5 5~53.5 5R39.5 5~34.0 5759,0 5a70.0 5634.,0 56o !., 5 5585.0 b57~,5 5550,5 9q.O 5R90,5 5~70,5 5856.0 5~32,5 b~lO,5 5787.0 5774.0 575~,o 573~.5 565~.5 5570,0 5527,n 5520,o 99,5 PASS ~.4 OF TFlE TOTP. ThE DEPT[I REFI,LCT }:~,f)F~Y PASS ~4 G~CH TO URV~S8 v~/;PE CAR~iF~t} ~!T[! THE PAGE: 32 ~ ~,.~ ~ } ' · RCo Ab~?KA, I.~:.~C Comuanv ~4ame F~- '~'F~tJDhI"~t'Y, ...... ~?~'Y Field ~ame ~,: i,),S. 4-19 Well Name chlUn~herqer Alaska Ccr:putlnn Center 5-APP-] 995 PAGE: 33 AP ~' -n - (~ er a umber Field Location Section Township ~ange County State or Province Nation Witness Name Service Urder Number Permanent datum ~levatioD of Permament Datum Leo ~easured From adore Permanent Datum ~levation of Kelly Bushinq ~levation of Derrick Floor Elevation of Ground Level Total Depth - Driller Total, Depth - Logger Bottom boq Interval ToD [.~o~ I'Dterval D.rilliD~ FlUid TFpe Time !.~o~oer at, bbttom ..... - ......................... - .............. SIGM Sioma (i'~eutro~, Capture Cross TPH? TDT Porosity sI'~ Corrected ~oreno!e TP~? Pati, on Torsi ~'~ear to Far counts TSC~ Tots!. Selected Counts - ~esr TSCF Total Selected Cou~ts ~ ~'ar l?etector If:~ ~nelastic count rate - near detector I~F"P Inelastic cou~%t rate - ~ar detector G~C~ Gam~a Ray ~n ,!$ ~a~e. Veri(~.cation [,istina icblumberq~r ~laska Co~pt~ti.ha C~r, ter PAGE; 34 ** SET TYPi! [ [? ri ;~' D E P F P T F T 5 o 62 S~G~,~ TDTP CU ~On2 'r ~I T!'~TP 6",I-S ~062 TPA~' T ].,:~'r P 5062 T ¢ C ''~ '" i} 'r p C P S 5062 ,.., - ' r .. . ~ . · TSCF T[)TP CP& 7 i. I 4 OB O000000000 7 I i 4 68 0000000000 7 I I 4 68 0000000000 7 ! I 4 68 OOOO000000 7 1 ! 4 68 000(~000000 7 ! i 4. 68 0000000000 7 I i 4 68 0o00000000 '7 ! I 4 68 0o00000o00 7 I t 4 68 0000¢00000 7 i I 4 68 0000000000 ..... ~ -. ~ J, _ ,' · ~ 'rf;,TP 1.52o*: 'rsc~"-~ Tf?TP !525 732 435 '!48 GRC~ <?r}:f'P -999 250 TPN i. TDTP 20,716 TSCF', l'PTO 700.715 T P }': I. T P T P T 8 C F'. T t)T'n -g99. 250 -999.25(:) 8!BH.TOTP I f:l N D. T Il) T P S I :B H . T D T P I N i',~ b . T D T P 46 114 -999.250 -999.250 ,., a IS Ta~e Yeriiipatio~ Listi. nq 5-A~D--1995 12:01 PAGE: 35 ['~er~th sh!,ft':ed and cli. c~Ded curves for each ~ass in separate files. DKP~'H l ~,.~Ct~E~EN ]: 0.5000 I,i')~,'G TO[..1L CL'}Pi;: S'!"~tT [)ff~P'.l:~ S[[GP :;:; ; ::;: ..... . ~ASEL!~,;E CURv~: FOr:: SHIFTS [.,DwG C1j~VE COD6'~: .u:&SEI, I r:E DEP T'~.I 596~,0 5061 .0 5q60,© 594,9,, 5 5q48.5 5q2~ 5 5922.0 5 ~ 8 2: 0 5856,5 5939.5 5~ 3~:t, O 5825,5 5825.5 .......... EL~UIVAt:EF!T U~,:6H!FTED i'.~EP?H ...... 5959,5 5a56.5 581.1.0 IS Tare Veri. fication [,tst:lnq PAGE~ 36 5~07. ~ 5907. 57'73, (3 577 3,0 5756.0 5755.5 5751.5 5752.0 5670.. 5 5670. 5660,5 5571. o 557n. 0 5552. n 555 5536 . 5 55 ~4~,n 549~.o 547~,5 547P.5 5455,5 5455. n 5451 ,~ 5440.5 5 ~O~. 0 5.4.07.5 5394,0 5]94. 5367,0 5367, 53 lO. 5 5310. 530~ ,5 5~01 .... ,-.~,. 0 5224. $ 5204.5 520 5~ g2.5 ~:137 5 5136.C -,~ ~ .- . 5!35.5 5~29.0 5J2~.0 50g0.5 5o7g, 50(~ 0 5n5 !. n 5051. 5047.0 5~43.5 5030.0 5o40.5 PO;7 o 503~ 5 5022.5 5f) 27.0 4gqS. 0 4994.5 4~92.n 4~g2,5 4055,5 4955 0 '5 4044.5 4.,.~7.0 .4926.0 4921,5 4q21,5 4921 ,O ~876.5 4875.0 4~6g,0 4867.5 4841.0 4,83q, 5 482~, 0 4, a28.0 ....... . 0. 4 90 ?, 0 4,766,0 47~4.0 473 g, 0 47 472],0 4720,0 4702,5 ~4702,0 4697,5 4698, ,IS rape verj~.cation listino ;c~lumberqer AlaSKa Corr~l~t~nq Center 5-AkR--.~ 995 1.2:01 4695.5 4697.5 4677.e 4675,0 466~. ~. 4667. C~ 4646. ~.~ 4644.5 ~641.5 ~64~ .5 463t .0 4g2g.5 4604.5 4602.5 4602 . ~ 4599 . (~ 4590,~ 45B~,0 4565.0 456~, O qSb 3. (} 45!7,5 4515.0 4~07,0 4504,5 4457.5 4453.5 4445.0 4441 .5 4424,5 442 1. ~ 4~]9.0 441.~.0 44(}9,5 4 ~ () 6,, 5 4.390. ~ 4387,0 .:~ 360,0 4356,~ ,~35~,n 4356,0 ~00,0 96,5 98,0 P~APK. S: T,U,I$ FIl;g CO,'.,:TAI~'~S P.()RAX PAS$ ~5 Of: TDEL TI~TP. TN~] DF~PTk! BASF F'~S5 ~ GRC~ flNl.'.; 60PBX P~bS ~5 E;IG~'~ 'PO ?~,SE PAS~ ;5IG ~,~ SHI'~'TS PAGE: 37 C~'! ARCC~ hL,~SKh, lt4C. Companv Name APl, t: 50-02~-2]. 79~.-()0 AP! Seri, al ~Jt]mber ~t 0~o8' ~S[,,, k 0255' FwL Field Location S~C, 7. 6 Se c t i. on T P ~ P i I h 'I o v~ n s h I p 8TAT ~;I,AS~A state or Province · ~ aT? USA Nat ior, . ~ . 5PN 5~)62f~2 Service Order Number IS Tar, e ver~.f..:~.cat~or~ [,istin¢: chlt~-.¢rg~r AlasKa Co,'putl. n~ Ce,re! PAGE: 38 .., pDAT ,'4FA~ SEA [,EVEI_, Permar~ent datum KD!') FT ~) Elevation ot Permanent Datum L~F F{[[.,I,Y tt~g}-{I~([, Loa ~easured From ADI.~ FT t.O, Above Permanent Datum g~l¢ FT ~.0, Elevate_on of ~el].y ~ushin~ EPF ='r 59. F:levatien of oerr~c~ Floor ECL w~[~ 21. Elevation oi Ground Level TD[.; ~'T bqbo. Tot. a]. 'DePth - Driller TnI, F1 C, lOO. Total.. Det~th - Looqer ~,Y,I FI ~096. got tom LoG Interval T[,I wi' 34~6. 'To~ }.,Da Interval [>WT bORAX ~:,E~WA'CKR ~r 13. i~g Fluid Type ;~'[.AP 2232 l';'~,~At~-q5 Time boGOer at Bottom STG~ ~iq~a (~eut. ron Capture Cross sectiop) TPMT TDT Porosity 8IB~~ Correcte~ ~oreho!e TPA~!~ ~ation Total ~ear to Par counts TSC~ Total Selected Counts - ~ear Detector T$CV ~otal Se!ect~d Counts - ~"ar Detector INND '[De!astic count rate - near detector !NF~ Inelastic count rate - far detector ** Sii]7~ TYPU - 64Eg ** 1 68 0 3 73 40 4 66 ~ ~) 73 7 65 8 68 0,5 9 65 WT 1! ~5 25 ~ 6e !3 66 0 I.,~ Tat:e Veri£icati, on [,is'tInq ch!.t~mbero.~r AlaSka Comootirl.~ Center 5-A~R-!995 ~ ~: C'.i PAGE: 39 [,"... n"~:'~. ._, . ~,: /,r~c;.. . TYP~ CLASS,.. ~t;,[~ .~O~'.h S~P ~LEi~ CODE (HEX) [)~ Pq' FT 5()~207 r~) (~C-0 O0 0 ~ !. 1 4 68 O0000000U0 SIG~' '!?T:Tp C~ 506202 00 ,qCO O0 (.) 8. 1 1 4 6R 00(30000000 TP~iT To'rp ~u-s 50~n2 fi() 0(',0 O0 0 ~ I 1 4 6~ OOOO000000 SIp,~ ~[;~p CU %(~, 202 0() ~) o 'r3 n0 0 8 ! 1 4 6B ()000000000 TPA~' TDTP 5O6202 0(> ()tO O0 0 ~ I I 4 6~ 0000000000 TSCt' 'rDTP CPS 506202 0[; 000 00 0 ~ 1 1 4 OR O00OC, 00000 TSCF TDTP CPS 506202 O0 ()c,(~ 00 0 ~ I ! 4 6~ 0000000000 I ~ ~,~ ~ ~' 1) · P C P S 506202 0 () 000 00 0 ~ 1 I 4 68 O 000000000 ! ~'~ ~' ~T }~) T P CPS 5062n2 O0 060 00 0 8 i I 4 68 OOC'O000000 G~C~ 'rb?p (;APT 596202 00 00() 00 0 ~ 1 i 4 6~ 0000000000 g~P}!I.Ti) TO -999 250 250. TSCF'.TD'[D. , -9~50 S I BH. T D .'I. 7 P IN~,iD. TDTP 8T, BH.TDTP 108.342 ~655,728 -999.250 -999.250 [, E; R * El)IT FblC 00! CO! 951O4/ b 0 LIS Tane Veri. ficatior, l,istino Schlt]mherqer ~lasK~ C'o~';)ut~no Cer:ter 5-AFR-1995 12:01 PAGE;: 40 Ptjl. sed Net. liFOS%: l~P~veraqed edited Pass 1 6a~,-~a ~:av ar..cJ cackround counts; arithmetic average edited ~tatJ. c Oasellne ?c%sses for ail ct. her curves. TI.'2T P 1 , 2 ~ 3, ~:'~,A~KS 1..,., ]:;~E .a~]l'~g'r;[C..; bVFk~(;g [)~' 'I'.'~E 'i'Hk~E~: ............ E.~A."E,,:, PASSES ~ I ........... , . .... ..... 4 91 8F'~CAUSE ['~A,:~ t~2 ~;A5 !'~{)T LOGGED 9 ....... .. ~ .... ... V ~ [ [! I]EFI, FI~ (:908' ~'S).., ~ 0255' T 0 b ? 1 1 APb ~9 6 fl, [,:DK F~!' 59, Company Name Field Well API serial i'~umber b~leld Location Sectiom ToWlgsh County St:ate or ~rov~nce ~.~at ion witness Name Service Order Number Permanent datum Elevation ot Permanent Dattlm [,og ~east/red From ~bove Pertr, anent Datum Elevatto~ of Kelly Bushing [:levat~on of Derrick Floor DIS Tape Verification Listi Schlumberger Alaska ¢omput nng~ Center 5-APR-1995 12101 PAGEI 41 TUN! .VALU DEFI EGL FT 2! Elevation ot Ground bevel TOD FT 69~0. Total Depth - Driller TDL FT 6100. Total Depth - Logger BL! FT 6096, Bottom Log Interval TLI FT 3486 Top Log 'Interval DFT BORA~ SEAWATER DrlllingFluid Type ,TLAB 2232 ~7-MAR-g5 Time Logger at Bottom TABLE TYPE ~ CURV DEF! D~PT D~p~h $IG~ 8~ma (Neutron Capture Cross $ect~on) TPH! TDT Porosity $IBH Corrected Borehole Sigma TRAT Ration Total Near to rat counts TSC~ Total Selected Counts - Near Detector TSCF Total Selected Counts - Far Detector INND ~nelastlc count rate - near detector INFO Inelastic count rate - tar detector GRCH Gamma Ray in Casing DATA FORMAT SPECIFICATION RECORD ** SET TYPE - 64EB TYPE REPR CODE VALUE I 66 2 66 0 3 73 4O 4 66 5 66 6 73 7 65 9 65 11 66 25 12 68 13 66 0 14 65 rT 15 66 68 16 66 1 0 66 1 PAGE: ................ ~[ ............... ; ...... i:<r"~D~ . bOG TYPE C,.L:R~S ~.~Oi) :~b~ S.~xP ~l~E:~! CODE fHEX) ;'~'-~'-';;-'-;;~ ,~ .... ~---; .... ; ..... ; ..... ~ ..... ~_ .... ~-~;;~;--,~ C!~ ~{:6202 O0 (~r_; o OO 0 9 ! I 4 6~ Or~O00000OO Pie-F, 506202 o~) (~C:O O0 0 a 1 1 4 b2 0000000000 C~; 5u6202 O0 (~()(~ O0 0 q ! l 4 b8 0000000000 5u6202 O0 ,,) (' C, OC; 0 9 I 1 4 6~ OOOO000000 CPS 5(;62o2 no OC{; CO 0 9 1 I 4 68 O0000000uO CPS 5o6202 oO 0o(~ O0 0 n ~ I 4 Oa 000000000o C P S ~ {~ 6 '202 0 o o (', ('} 00 G q ! 1 4 O 8 0000 () 00000 C P S 5 t,~ (:. 202 00 <; 00 0 o 0 a 1 1 4 (, S 00 ~.,, 0000000 G~E'I ~0~?02 O0 i;O(~ O0 r) 9 1 1 4 68 0000000000 mmmmmmmmmmmmmmmmmmmmmmmmm!~m mmmmmmmmmmmmM~'' ! mmmmmmm.mmmmmmmmmmmmmmmmmmmmmmmm~mmmmm! 42 SIBH. P~,;AV iNND P~,~AV . 49.~35 2064.216 -909.250 -999.25O D~TF: : 95/04/ 5 ~,~X ~[~C SIZF: : 1024 F~bF TYPE: L~S~' PILE : 1 'J C, P k U L) H 0 E BAY, 50-02g-21791-Ofi I~ Ta~:~e Yeti[teat. ion !ist. lnq chlUr~;ber,?er AlasKa Con[.,~mtInq Cer~t.e~;' PA~E: 43 * ALASKA COMPUTING CENTER * . . ****************************** * ............................ * . ....... SCHLUMBERGER ....... . . ............................ . ****************************** COMPANY NAME : ARCO ALASKA, INC. WELL NAME : D.S. 4 - 19 FIELD NAME : PRUDHOE BAY BOROUGH : NORTH SLOPE STATE : ALASKA API NUMBER : 500292179100 REFERENCE NO : 97235 RECEIVED JUN 1 9 199Z Alaska Oil & Gas C, ons, Con~ .~mc~orage LIS Tape Verification Listing Schlumberger Alaska Computing Center 16-JUN-1997 16:49 PAGE: **** REEL HEADER **** SERVICE NAME : EDIT DATE : 97/06/16 ORIGIN : FLIC REEL NAME : 97235 CONTINUATION # : PREVIOUS REEL : COFiMEiTT : ARCO ALASKA INC, D.S. 4-19, PRUDHOE BAY, 50-029-21791-00 **** TAPE HEADER **** SERVICE NAME : EDIT DATE : 97/06/16 ORIGIN : FLIC TAPE NAME : 97235 CONTINUATION # : 1 PREVIOUS TAPE : COGENT : ARCO ALASKA INC, D.S. 4-19, PRUDHOE BAY, 50-029-21791-00 TAPE HEADER PRUDHOE BAY CASED HOLE WIRELINE LOGS WELL NAME: D. S. 4 - 19 API NUMBER: 5002921791 O0 OPERATOR: ARCO ALASKA, INC. LOGGING COMPANY: SCHLUMBERGER WELL SERVICES TAPE CREATION DATE: 16-JUN-97 JOB NUMBER: 97235 LOGGING ENGINEER: WALSH OPERATOR WITNESS: KEN NEUPERT SURFACE LOCATION SECTION: 2 6 TOWNSHIP: 1 iN RANGE: 15E FNL : FSL: 908 FEL : FWL: 255 ELEVATION(FT FROM MSL O) KELLY BUSHING: 60. O0 DERRICK FLOOR: 59. O0 GROUND LEVEL: 21. O0 WELL CASING RECORD 1ST STRING 2ND STRING 3RD STRING PRODUCTION STRING OPEN HOLE CASING DRILLERS CASING BIT SIZE (IN) SIZE (IN) DEPTH (FT) WEIGHT (LB/FT) 9.625 6992.0 47.00 4.500 5895.0 15.00 7.000 2993.0 26.00 5.500 3110.0 17.00 CURVE SHIFT DATA - ALL PASSES TO STANDARD (MEASURED DEPTH) LIS Tape Verification Listing Schlumberger Alaska Computing Center 16-JUN-1997 16:49 BASELINE CURVE FOR SHIFTS LDWG TOOL CODE: LDWG CURVE CODE: GR RUN NUMBER: PASS NUMBER: DATE LOGGED: LOGGING COMPANY: .......... EQUIVALENT UNSHIFTEDDEPTH .......... BASELINE DEPTH GRCH ..................... 88888.0 88894.0 5888.0 5894.0 5876.0 5882.5 5855.0 5862.5 5844.5 5851.0 5810.0 5817.0 5782.5 5789.5 5752.5 5760.0 5731.5 5738.0 5707.0 5713.5 5651.0 5656.5 5628.0 5634.0 5598.0 5601.5 5481.5 5489.0 5433.5 5441.5 5400.5 5408.0 5362.5 5369.5 5350.5 5358.0 5346.0 5352.5 5337.0 5342.0 5325.0 5329.5 5311.0 5316.5 5280.5 5288.5 5266.5 5274.5 5262.0 5269.5 5231.0 5238.0 5217.5 5225.0 5205.5 5209.5 5166.5 5172.0 5143.0 5148.0 5099.0 5106.0 5072.0 5079.0 5062.0 5068.5 5038.0 5045.0 5011.5 5019.0 5009.0 5014.5 5003.0 5011.0 4985.0 4991.5 4970.0 4977.0 4946.5 4954.0 4879.5 4888.0 4861.0 4868.0 4842.5 4848.5 4823.0 4829.0 4760.5 4768.0 PAGE: LIS Tape Verification Listing Schlumberger Alaska Computing Center 4756.0 4729.0 4712.0 4693.0 4672.5 4642.0 4581.5 4552.0 4545.5 4478.5 4436.5 4415.0 4362.0 4307.5 4269.5 4253.0 4225.0 4214.0 4154.0 4126.0 4065.0 4053.5 4039.0 4028.5 4002.0 3969.5 3941.0 391 O. 5 3894.5 3870.0 3852.5 3836.0 3806.5 3786.5 3777.5 3715.0 3693.0 3676.0 3664.5 3622.5 3600.0 3589.5 3581.5 3556.5 3541.5 3517.5 3487.0 3424.5 3396.0 3379.5 3356.5 3304.0 3262.5 3249.5 3235.5 3174.5 4762.5 4735.0 4718.0 4699.5 4679.0 4647.5 4586.0 4557.5 4548.5 4484.5 4443.5 4420.0 4367.5 4315.0 4276.5 4257.5 4231.0 4220.5 4159.0 4132.0 4069.5 4058.5 4043.0 4033.0 4006.0 3973.5 3945.5 3916.5 3899.5 3874.5 3858.5 3840.0 3810.0 3790.5 3782.0 3716.5 3693 5 3677 5 3667 5 3625 0 3602 5 3593 5 3583.5 3559.5 3545.5 3524.0 3492.5 3429.0 3400.5 3383.0 3361.0 3307.5 3268.0 3254.0 3239.0 3178.5 16-JUN-1997 16:49 PAGE: LIS Tape Verification Listing Schlumberger Alaska Computing Center 16-JUN-1997 16:49 3146.0 3150.0 3128.5 3133.5 3086.0 3091.0 3067.5 3071.5 3063.5 3066.5 3034.0 3037.0 2999.5 3001.5 2979.5 2982.5 2962.0 2964.0 2919.0 2921.5 100.0 102.5 $ REMARKS: This tape contains the cased hole LDWG edit for Arco Alaska D.S. 4-19 TDTP. There are two baseline passes and two borax pass, an average file and four raw data files. The depth adjustments shown above reflect cased hole GR to open hole BCS GR. All other TDTP curves were carried with the SIGM shifts. Gamma Ray provided by the client. $ $ PAGE: **** FILE HEADER **** FILE NAME : EDIT .001 SERVICE : FLIC VERSION : O01CO1 DATE : 97/06/16 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER: 1 EDITED CURVES Depth shifted and clipped curves for each pass in separate files. PASS NUMBER: 1 DEPTH INCREMENT: 0.5000 FILE SUMFiARY LDWG TOOL CODE START DEPTH STOP DEPTH GRCH 5905.0 2008.0 TDTP 5896.0 2008.0 $ CURVE SHIFT DATA - PASS TO PASS (MEASURED DEPTH) BASELINE CURVE FOR SHIFTS LDWG CURVE CODE: PASS NUMBER: .......... EQUIVALENT UNSHIFTEDDEPTH .......... BASELINE DEPTH GRCH TDTP LIS Tape Verification Listing Schlumberger Alaska Computing Center 16-JUN-1997 16:49 PAGE: REMARKS: This file contains TDTP Pass #1 (Base Pass #1). pass to pass shifts were applied to this data. $ LIS FORMAT DATA No ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** .............................. TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 96 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 10 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 0 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) ....................................................................................... DEPT FT 100713 O0 000 O0 0 1 1 1 4 68 0000000000 SIGM TDTP CU 100713 O0 000 O0 0 1 1 1 4 68 0000000000 TPHI TDTP PU-S 100713 O0 000 O0 0 1 1 1 4 68 0000000000 SBHF TDTP CU 100713 O0 000 O0 0 1 1 1 4 68 0000000000 SBHNTDTP CU 100713 O0 000 O0 0 1 1 1 4 68 0000000000 SIGC TDTP CU 100713 O0 000 O0 0 1 1 1 4 68 0000000000 SIBH TDTP CU 100713 O0 000 O0 0 1 1 1 4 68 0000000000 TRAT TDTP 100713 O0 000 O0 0 1 1 1 4 68 0000000000 LCO1 TDTP 100713 O0 000 O0 0 1 1 1 4 68 0000000000 SDSI TDTP CU 100713 O0 000 O0 0 1 1 1 4 68 0000000000 BACK TDTP CPS 100713 O0 000 O0 0 1 1 1 4 68 0000000000 FBAC TDTP CPS 100713 O0 000 O0 0 1 1 1 4 68 0000000000 TCAN TDTP CPS 100713 O0 000 O0 0 1 1 1 4 68 0000000000 TCAFTDTP CPS 100713 O0 000 O0 0 1 1 1 4 68 0000000000 LIS Tape Verification Listing Schlumberger Alaska Computing Center 16-JUN-1997 16:49 PAGE: NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CI.~SS MOD NUMB Sg2.1P ELI~I CODE (HEX) TCND TDTP CPS 100713 TCFD TDTP CPS 100713 TSCN TDTP CPS 100713 TSCF TDTP CPS 100713 INND TDTP CPS 100713 INFD TDTP CPS 100713 GRCH TDTP GAPI 100713 TENS TDTP LB 100713 CCL TDTP V 100713 GR DAT GAPI 100713 O0 000 O0 0 1 1 1 4 68 0000000000 O0 000 O0 0 1 1 1 4 68 0000000000 O0 000 O0 0 1 1 1 4 68 0000000000 O0 000 O0 0 1 1 1 4 68 0000000000 O0 000 O0 0 1 1 1 4 68 0000000000 O0 000 O0 0 1 1 1 4 68 0000000000 O0 000 O0 0 1 1 1 4 68 0000000000 O0 000 O0 0 1 1 1 4 68 0000000000 O0 000 O0 0 1 1 1 4 68 0000000000 O0 000 O0 0 1 1 1 4 68 0000000000 ** DATA ** DEPT. 6550.000 SIGM. TDTP -999.250 TPHI. TDTP -999.250 SBHF. TDTP -999.250 SBHN. TDTP -999.250 SIGC. TDTP -999.250 SIBH. TDTP -999.250 TRAT. TDTP -999.250 LCO1.TDTP -999.250 SDSI. TDTP -999.250 BACK. TDTP -999.250 FBAC. TDTP -999.250 TCAN. TDTP -999.250 TCAF. TDTP -999.250 TCND. TDTP -999.250 TCFD. TDTP -999.250 TSCN. TDTP -999.250 TSCF. TDTP -999.250 INND. TDTP -999.250 INFD. TDTP -999.250 GRCH. TDTP -999.250 TENS. TDTP -999.250 CCL. TDTP -999.250 GR.DAT 59. 436 DEPT. 2010.500 SIGM. TDTP 29.892 TPHI. TDTP 73.176 SBHF. TDTP 53.931 SBHN. TDTP 65. 530 SIGC. TDTP 1. 528 SIBH. TDTP 74. 525 TRAT. TDTP 2. 198 LCO1. TDTP 3. 654 SDSI. TDTP 1.316 BACK. TDTP 127. 555 FBAC. TDTP 17. 878 TCAN. TDTP 15424. 248 TCAF. TDTP 3966. 635 TCND. TDTP 14633. 896 TCFD. TDTP 3287. 886 TSCN. TDTP 1941.577 TSCF. TDTP 531. 418 INND. TDTP 2306.571 INFD. TDTP 259. 960 GRCH. TDTP 9. 266 TENS. TDTP 730. 000 CCL. TDTP O. 000 GR.DAT -999. 250 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .001 SERVICE : FLIC VERSION : O01CO1 DATE : 97/06/16 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : LIS Tape Verification Listing Schlumberger Alaska Computing Center 16-JUN-1997 16:49 PAGE: **** FILE HEADER **** FILE NAME : EDIT .002 SERVICE : FLIC VERSION : O01CO1 DATE : 97/06/16 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER: 2 EDITED CURVES Depth shifted and clipped curves for each pass in separate files. PASS NUMBER: 2 DEPTH INCREFiENT: 0.5000 FILE SUMMARY LDWG TOOL CODE START DEPTH STOP DEPTH GRCH 5905.0 2002.0 TDTP 5896.0 2002.0 $ CURVE SHIFT DATA - PASS TO PASS (MEASURED DEPTH) BASELINE CURVE FOR SHIFTS LDWG CURVE CODE: GR PASS NUMBER: 1 .......... EQUIVALENT UNSHIFTEDDEPTH .......... BASELINE DEPTH GRCH TDTP ............................ 88888.0 88893.5 88896.5 5888.5 5894.0 5876.0 5884.5 5862.5 5870.0 5844.5 5851.5 5827.5 5835.5 5801.5 5806.5 5795.0 5802.5 5766.5 5774.0 5755.5 5762.5 5732.5 5739.5 5727.0 5734.5 5711.0 5718.0 5708.5 5712.5 5688.0 5694.0 5678.5 5685.0 5650.5 5656.5 5631.5 5637.0 5629.5 5634.5 5600.5 5605.0 5584.0 5590.0 LIS Tape Verification Listing Schlumberger Alaska Computing Center 16-JUN-1997 16:49 PAGE: 5583.5 5578.5 5554 5 5528 0 5527 0 5514 0 5485 5 5484 5 5470 5 5454 0 5448.0 5431.0 5402.5 5401.5 5398.0 5396.5 5360.5 5359.5 5350.5 5335.0 5325.5 5325.0 5310.0 5308.0 5294.0 5285.0 5283.0 5271.5 5264.5 5259.0 5244.0 5239.0 5230.0 5206.0 5204.5 5197.5 5182.0 5174 5 5165 0 5163 0 5149 5 5141 0 5128 0 5127 5 5113.5 5097.5 5095.0 5072.0 5071.0 5051.0 5038.5 5036.5 5029.0 5012.0 5009.5 5534.5 5520.5 5493.0 5462.0 5437.0 5408.0 5404.0 5367.0 5330.5 5314.0 5291.0 5266.0 5250.0 5212.0 5185.5 5169.5 5133.0 5101.5 5079.0 5057.5 5045.5 5589.0 5585.0 5559.5 5533.0 5491.5 5477.5 5456.0 5409.5 5403.5 5367.5 5358.0 5340.0 5330.5 5315.5 5301.0 5294.0 5279.5 5273.0 5247.5 5236.0 5208.0 5202.5 5176.5 5169.0 5156.5 5146.5 5133.5 5119.5 5105.0 5078.0 5044.0 5036.5 5019.5 5015.5 LIS Tape Verification Listing Schlumberger Alaska Computing Center 16-JUN-1997 16:49 PAGE: 5004.5 5011.0 4997.0 5005.0 4984.5 4991.0 4948.0 4955.5 4946.5 4954.5 4919.5 4927.5 4919.0 4927.0 4892.5 4900.5 4883.0 4890.5 4871.0 4877.5 4863.5 4870.5 4847.5 4854.0 4842.0 4848.5 4821.5 4828.0 4802.0 4809.0 4794.0 4801.0 4761.0 4768.5 4757.5 4764.5 4746.5 4752.5 4721.0 4728.0 4717.0 4724.0 4711 . 0 4716.0 4693.0 4700.0 4672.5 4679.5 4662.0 4668.0 4646.5 4651.0 4645.5 4654.0 4638.5 4646.0 4603.5 4612.0 4600.0 4604.0 4589.5 4595.5 4583.5 4588.0 4564.0 4567.5 4548.5 4556.5 4526.5 4531.0 4499.0 4504.0 4493.5 4501.0 4491.0 4495.0 4478.5 4485.0 4459.0 4464.5 4450.5 4457.0 4436.5 4444.0 4423.5 4428.5 4400.5 4406.5 4389.0 4395.0 4363.0 4369.0 4352.5 4357.5 4320.5 4326.5 4318.0 4323.5 4300.5 4306.0 4279.5 4286.5 4263.0 4267.5 4252.5 4259.5 4234.5 4240.5 4189.0 4195.5 LIS Tape Verification Listing Schlumberger Alaska Computing Center 16-JUN-1997 16:49 PAGE: 10 4186.0 4192.0 4152.5 4158.5 4148.5 4154.0 4139.5 4146.5 4111.5 4117.5 4108.5 4114.5 4074.0 4078.0 4069.5 4074.5 4067.0 4071.5 4026.5 4032.0 4024.0 4028.0 4012.5 4015.0 3999.5 4004.0 3955.0 3959.5 3937.5 3942.5 3934.0 3938.5 3898.5 3901.0 3894.5 3900.0 3870.5 3873.0 3853.0 3856.0 3849.5 3855.0 3835.5 3840.0 3818.0 3823.0 3799.0 3802.5 3774.5 3777.5 3778.0 3762.5 3765.5 3758.0 3761 . 0 3736.0 3740.5 3730.5 3731.0 3715.5 3716.5 3712.5 3716.0 3708.0 3709.5 3689.0 3690.0 3677.0 3680.0 3655.0 3656.0 3625.5 3625.5 3624.5 3628.5 3602.5 3605.0 3598.0 3599.5 3581.5 3581.0 3549.0 3553.0 3539.5 3538.0 3520.5 3525.5 3507.5 3512.0 3495.5 3493.0 3489.5 3495.5 3481.5 3480.0 3473.0 3478.5 3447.0 3445.5 3440.0 3444.0 3425.5 3429.0 3408.5 3411.0 3399.0 3403.5 3396.0 3393.0 3394.5 3400.5 LIS Tape Verification Listing Schlumberger Alaska Computing Center 16-JUN-1997 16:49 PAGE: 11 3386.0 3390.0 3378.5 3382.5 3367.5 3365.0 3360.0 3364.5 3353.5 3351.5 3337.0 3340.5 3317.0 3314.0 3311.5 3313.0 3285.5 3285.0 3284.5 3282.5 3246.0 3251.0 3238.5 3235.0 3238.0 3241.5 3232.0 3229.5 3209.5 3207.0 3209.0 3214.0 3188.5 3194.5 3174.5 3170.5 3165.5 3172.0 3147.0 3142.5 3139.0 3146.0 3115.5 3113.0 3110.5 3115.5 3097.5 3104.0 3094.5 3091.0 3075.5 3081.5 3074.0 3071.5 3055.0 3061.0 3046.0 3044.0 3034.0 3031.0 3016.0 3012.0 3012.5 3016.5 2985.5 2989.0 2982.0 2986.5 2976.0 2978.5 2964.5 2962.0 2954.5 2959.0 2948.0 2945.5 2933 . 0 2941 . 5 2900.5 291 O. 5 2888.5 2885.0 2855.0 2863.0 2831.5 2828.5 2827.5 2833.5 2802.5 2810.0 2789.5 2796.0 2788.5 2786.5 2764.0 2767.0 2746.5 2751.0 2700.0 2702.5 2665.5 2664.0 2628.5 2631.0 2585.0 2582.5 2577.0 2574.5 2545.5 2548.5 LIS Tape Verification Listing Schlumberger Alaska Computing Center 16-JUN-1997 16:49 PAGE: 12 2544.5 2541.5 2488.5 2492.0 2473.5 2469.5 2443.5 2440.0 2440.0 2445.0 2418.5 2423.0 2368.0 2369.5 2358.5 2361.5 2347.0 2344.0 2330.5 2333.0 2304.0 2306.5 2273.5 2276.0 2270.0 2268.0 2251.5 2254.0 2239.0 2236.0 2226.0 2229.0 2189.0 2191.5 2188.0 2184.0 2141.0 2136.5 2140.5 2143.5 2113.0 2116.0 2078.5 2074.0 2058.5 2054.0 2055.5 2058.0 2042.0 2045.0 2034.0 2029.0 2011.5 2014.5 100.0 95.0 103.0 $ REMARKS: This file contains TDTP Pass #2 (Base Pass #2). The depth shifts shown above relect GRCH Pass #2 to GRCH Pass #1 and SIGM Pass #2 to SIGM Pass #1. $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 92 4 66 1 5 66 6 73 7 65 8 68 O. 5 9 65 FT LIS Tape Verification Listing Schlumberger Alaska Computing Center 16-JUN-1997 16:49 PAGE: 13 TYPE REPR CODE VALUE .............................. 11 66 11 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** ....................................................................................... N~VlE SERV UNIT SERVICE API API API API FILE NUMB NUmB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 100713 O0 000 O0 0 2 1 1 4 68 0000000000 SIGM TDTP CU 100713 O0 000 O0 0 2 1 1 4 68 0000000000 TPHI TDTP PU-S 100713 O0 000 O0 0 2 1 1 4 68 0000000000 SBHF TDTP CU 100713 O0 000 O0 0 2 1 1 4 68 0000000000 SBHN TDTP CU 100713 O0 000 O0 0 2 1 1 4 68 0000000000 SIGC TDTP CU 100713 O0 000 O0 0 2 1 1 4 68 0000000000 SIBH TDTP CU 100713 O0 000 O0 0 2 1 1 4 68 0000000000 TRAT TDTP 100713 O0 000 O0 0 2 1 1 4 68 0000000000 LCO1 TDTP 100713 O0 000 O0 0 2 1 1 4 68 0000000000 SDSI TDTP CU 100713 O0 000 O0 0 2 1 1 4 68 0000000000 BACK TDTP CPS 100713 O0 000 O0 0 2 1 1 4 68 0000000000 FBAC TDTP CPS 100713 O0 000 O0 0 2 1 1 4 68 0000000000 TCAN TDTP CPS 100713 O0 000 O0 0 2 1 1 4 68 0000000000 TCAF TDTP CPS 100713 O0 000 O0 0 2 1 1 4 68 0000000000 TCND TDTP CPS 100713 O0 000 O0 0 2 1 1 4 68 0000000000 TCFD TDTP CPS 100713 O0 000 O0 0 2 1 1 4 68 0000000000 TSCN TDTP CPS 100713 O0 000 O0 0 2 1 1 4 68 0000000000 TSCF TDTP CPS 100713 O0 000 O0 0 2 1 1 4 68 0000000000 INND TDTP CPS 100713 O0 000 O0 0 2 1 1 4 68 0000000000 INFD TDTP CPS 100713 O0 000 O0 0 2 1 1 4 68 0000000000 GRCH TDTP GAPI 100713 O0 000 O0 0 2 1 1 4 68 0000000000 TENS TDTP LB 100713 O0 000 O0 0 2 1 1 4 68 0000000000 CCL TDTP V 100713 O0 000 O0 0 2 1 1 4 68 0000000000 ** DATA ** DEPT. 5910.500 SIGM. TDTP -999.250 TPHI.TDTP -999.250 SBHF. TDTP -999.250 SBHN. TDTP -999.250 SIGC. TDTP -999.250 SIBH. TDTP -999.250 TRAT. TDTP -999.250 LCO1.TDTP -999.250 SDSI.TDTP -999.250 BACK. TDTP -999.250 FBAC. TDTP -999.250 TCAN. TDTP -999.250 TCAF. TDTP -999.250 TCND. TDTP -999. 250 TCFD. TDTP -999.250 TSCN. TDTP -999.250 TSCF. TDTP -999.250 INND. TDTP -999.250 INFD.TDTP -999.250 GRCH. TDTP 24.953 TENS. TDTP -999.250 CCL. TDTP -999.250 LIS Tape Verification Listing Schlumberger Alaska Computing Center 16-JUN-1997 16:49 PAGE: 14 DEPT. 1997. 000 SIGM. TDTP -999.250 TPHI. TDTP -999.250 SBHF. TDTP SBHN. TDTP -999. 250 SIGC. TDTP -999 . 250 SIBH. TDTP -999. 250 TRAT. TDTP LCO1. TDTP -999.250 SDSI. TDTP -999.250 BACK. TDTP -999.250 FBAC. TDTP TCAN. TDTP -999.250 TCAF. TDTP -999.250 TCND. TDTP -999.250 TCFD. TDTP TSCN. TDTP -999 J250 TSCF. TDTP -999.250 INND. TDTP -999.250 INFD. TDTP GRCH. TDTP 17.156 TENS. TDTP -999.250 CCL. TDTP -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .002 SERVICE : FLIC VERSION : O01CO1 DATE : 97/06/16 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .003 SERVICE : FLIC VERSION : O01CO1 DATE : 97/06/16 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE~BER: 3 EDITED CURVES Depth shifted and clipped curves for each pass in separate files. PASS ~BER: 3 DEPTH INCREMENT: 0.5000 FILE SUFk~ARY LDWG TOOL CODE START DEPTH STOP DEPTH GRCH 5905.0 3930.0 TDTP 5896.0 3930.0 $ CURVE SHIFT DATA - PASS TO PASS (MEASURED DEPTH) BASELINE CURVE FOR SHIFTS LDWG CURVE CODE: GR PASS NUMBER: 1 .......... EQUIVALENT UNSHIFTED DEPTH .......... BASELINE DEPTH GRCH TDTP LIS Tape Verification Listing Schlumberger Alaska Compu ting Center 16-JUN-1997 16:49 PAGE: 15 88888.0 88894.5 88890.5 5897.0 5903.5 5895.0 5900.5 5886.0 5891.5 5882.0 5884.5 5879.5 5882.5 5868.5 5873.0 5854.0 5858.5 5848.0 5856.0 5845.0 5851.0 5835.0 5840.5 5828.0 5833.5 5814.0 5821.5 5809.5 5817.0 5800.0 5806.5 5796.0 5803.0 5785.0 5793.5 5778.5 5785.5 5773.0 5780.5 5766.5 5774.0 5753.0 5760.0 5746.5 5753.0 5727.0 5734.5 5722.5 5728.0 5707.5 5712.5 5690.0 5696.0 5697.0 5681.5 5686.5 5668.0 5675.5 5653.5 5658.0 5633.0 5640.0 5630.5 5636.5 5626.5 5632.0 5615.0 5621.0 5614.5 5619.0 5611.5 5616.5 5595.5 5597.5 5589.5 5593.5 5584.5 5587.5 5574.0 5576.0 5571.0 5573.5 5555.0 5560.5 5536.5 5543.0 5530.5 5536.5 5513.5 5520.0 5506.5 5515.0 5502.0 5509.0 5485.0 5492.0 5470.0 5477.5 5457.5 5464.5 5451.0 5459.0 5459.0 5443.0 5451.5 5417.0 5426.5 5401.5 5409.5 5395.5 5404.0 LIS Tape Verification Listing Schlumberger Alaska Computing Center 16-JUN-1997 16:49 PAGE: 16 5383.5 5360.5 5360.0 5350.5 5349.5 5326.0 5325.5 5311.0 5308.5 5294.5 5283.5 5272.5 5258.0 5257.0 5252.5 5244.0 5217.5 5205.0 5204.0 5199.0 5180.5 5177.5 5162.5 5151.5 5149.5 5132 5 5129 5 5127 0 5114 5 5113 5 5102 0 5098.5 5072.0 5071.5 5069.0 5061.0 5048.5 5030.0 5023.5 5012.5 5009.5 5005.0 4989.5 4984.0 4973.5 4972.5 4949.5 4947 5 4938 5 4922 0 4919 0 4910 0 4880 0 4868.5 4862.0 5395.0 5367.5 5357.5 5330.0 5314.0 5291.5 5266.0 5259.5 5250.0 5225.0 5212.0 5204.5 5185.5 5167.0 5154.5 5137.5 5121.5 5108.0 5079.0 5076.5 5055.5 5029.5 5015.5 5011.0 4997.0 4982.0 4957.5 4928.0 4888.0 4878.0 5367.0 5357.5 5330.5 5317.0 5302.0 5279.0 5262.0 5208.0 5182.5 5154.5 5135.0 5132.0 5119.0 5104.5 5079.0 5067.0 5037.0 5020.0 4991.0 4980.0 4953.5 4945.5 4929.0 4918.5 4868.0 LIS Tape Verification Listing Schlumberger Alaska Computing Center 16-JUN-1997 16:49 PAGE: 17 4857.5 4865.0 4848.5 4854.0 4844.5 4850.5 4832.5 4836.0 4826.5 4832.0 4822.5 4827.5 4817.0 4822.5 4800.5 4806.5 4795.0 4800.5 4781.0 4787.5 4750.0 4757.5 4740.0 4746.5 4732.5 4737.5 4721.0 4726.5 4712.5 4718.5 4710.5 4716.0 4696.5 4702.5 4673.5 4679.5 4672.0 4679.0 4661.5 4665.5 4653.0 4658.5 4645.5 4651.5 4626.5 4632.0 4607.0 4612.0 4597.5 4602.0 4597.0 4601.0 4586.5 4592.5 4584.0 4590.5 4583.5 4588.0 4568.0 4572.5 4558.5 4562.5 4557.5 4562.0 4544.0 4547.5 4525.5 4530.0 4516.5 4520.0 4514.5 4519.5 4499.0 4504.5 4489.5 4495.0 4486.0 4491.0 4478.5 4485.0 4473.5 4478.5 4464.0 4470.5 4447.5 4451.5 4444.0 4451.0 4437.0 4444.0 4424.0 4428.5 4401.5 4408.0 4393.0 4395.5 4391.0 4398.0 4387.0 4389.5 4383.0 4390.5 4369.5 4376.0 4364.5 4368.5 4361.5 4368.0 4353.0 4358.0 LIS Tape Verification Listing Schlumberger Alaska Computing Center 16-JUN-1997 16:49 PAGE: 18 4347.5 4345.5 4333.0 4311.5 4306.5 4270.0 4260.5 4253.0 4249.0 4233.5 4230.5 4228.5 4226.0 4217.5 4215.5 4208.0 4190.0 4187.5 4169.0 4160.0 4156.0 4151.5 4141.0 4127.0 4117.0 4101.0 4090.5 4081.5 4063.0 4060.0 4056.0 4036.5 4036.0 4029.5 4020 5 4003 0 3996 5 3986 5 3985 5 3976 0 3972.0 3965.0 3956.0 3938.5 3934.5 100.0 $ REMARKS: 4350.0 4337.5 4318.5 4277.0 4266.5 4258.0 4237.0 4233.0 4231.0 4221.0 4211.0 4191.5 4172.0 4162.5 4160.0 4132.0 4107.5 4096.0 4083.0 4060.0 4042.5 4024.5 4008.0 3992.0 3979.0 3967.5 3942.5 104.0 4349.5 4306.0 4254.0 4234.5 4221.5 4195.0 4158.5 4146.5 4121.0 4068.0 4063.0 4039.5 4032.5 3999.5 3990.5 3976.0 3959.0 3938.5 104.0 This file contains Borax Pass #1 of the TDTP. The depth adjustments shown above reflect Borax Pass #1 GRCH to Base Pass #1 GRCH and Borax Pass #1 SIGMA to Base Pass #1 SIGMA. Ail other TDTP curves were carried with the SIGMA shifts. $ LIS Tape Verification Listing Schlumberger Alaska Computing Center 16-JUN-1997 16:49 PAGE: 19 LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE- 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 92 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 11 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 100713 O0 000 O0 0 3 1 1 4 68 0000000000 SIGM TDTP CU 100713 O0 000 O0 0 3 1 1 4 68 0000000000 TPHI TDTP PU-S 100713 O0 000 O0 0 3 1 1 4 68 0000000000 SBHF TDTP CU 100713 O0 000 O0 0 3 1 1 4 68 0000000000 SBHN TDTP CU 100713 O0 000 O0 0 3 1 1 4 68 0000000000 SIGC TDTP CU 100713 O0 000 O0 0 3 1 1 4 68 0000000000 SIBH TDTP CU 100713 O0 000 O0 0 3 1 1 4 68 0000000000 TRAT TDTP 100713 O0 000 O0 0 3 1 1 4 68 0000000000 LCO1 TDTP 100713 O0 000 O0 0 3 1 1 4 68 0000000000 SDSI TDTP CU 100713 O0 000 O0 0 3 1 1 4 68 0000000000 BACK TDTP CPS 100713 O0 000 O0 0 3 1 1 4 68 0000000000 FBAC TDTP CPS 100713 O0 000 O0 0 3 1 1 4 68 0000000000 TCAN TDTP CPS 100713 O0 000 O0 0 3 1 1 4 68 0000000000 TCAF TDTP CPS 100713 O0 000 O0 0 3 1 1 4 68 0000000000 TCND TDTP CPS 100713 O0 000 O0 0 3 1 1 4 68 0000000000 TCFD TDTP CPS 100713 O0 000 O0 0 3 1 1 4 68 0000000000 TSCN TDTP CPS 100713 O0 000 O0 0 3 1 1 4 68 0000000000 TSCF TDTP CPS 100713 O0 000 O0 0 3 1 1 4 68 0000000000 INND TDTP CPS 100713 O0 000 O0 0 3 1 1 4 68 0000000000 INFD TDTP CPS 100713 O0 000 O0 0 3 1 1 4 68 0000000000 GRCH TDTP GAPI 100713 O0 000 O0 0 3 1 1 4 68 0000000000 LIS Tape Verification Listing Schlumberger Alaska Computing Center 16-JUN-1997 16:49 PAGE: 20 NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) TENS TDTP LB 100713 O0 000 O0 0 3 1 1 4 68 0000000000 CCL TDTP V 100713 O0 000 O0 0 3 1 1 4 68 0000000000 ** DATA ** DEPT. 5911.500 SIGM. TDTP -999.250 TPHI.TDTP -999.250 SBHF. TDTP -999.250 SBHN. TDTP -999.250 SIGC. TDTP -999.250 SIBH. TDTP -999.250 TRAT. TDTP -999.250 LCO1.TDTP -999.250 SDSI.TDTP -999.250 BACK. TDTP -999.250 FBAC. TDTP -999.250 TCAN. TDTP -999.250 TCAF. TDTP -999.250 TCND. TDTP -999.250 TCFD. TDTP -999.250 TSCN. TDTP -999.250 TSCF. TDTP -999.250 INND.TDTP -999.250 INFD. TDTP -999.250 GRCH. TDTP 22.344 TENS.TDTP -999.250 CCL. TDTP -999.250 DEPT. 3934. 000 SIGM. TDTP 25.531 TPHI. TDTP 38.507 SBHF. TDTP SBHN. TDTP 94. 590 SIGC. TDTP O. 787 SIBH. TDTP 121. 028 TRAT. TDTP LCO1. TDTP 2. 432 SDSI. TDTP 1.264 BACK. TDTP 102. 920 FBAC. TDTP TCAN. TDTP 7569. 285 TCAF. TDTP 3048. 824 TCND. TDTP 10084. 871 TCFD. TDTP TSCN. TDTP 1180. 877 TSCF. TDTP 485. 646 INND. TDTP 2964.870 INFD. TDTP GRCH. TDTP 27. 609 TENS. TDTP 830. 000 CCL. TDTP O. 000 77. 850 1. 527 16. 032 3019. 854 347. 469 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .003 SERVICE : FLIC VERSION · O01CO1 DATE : 97/06/16 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .004 SERVICE : FLIC VERSION : O01CO1 DATE : 97/06/16 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER: EDITED CURVES LIS Tape Verification Listing Schlumberger Alaska Computing Center 16-JUN-1997 16:49 PAGE: 21 Depth shifted and clipped curves for each pass in separate files. PASS NUMBER: 4 DEPTH INCREMENT: O. 5000 FILE SUFk~ARY LDWG TOOL CODE START DEPTH STOP DEPTH GRCH 5905.0 3994.0 TDTP 5896.0 3994.0 $ CURVE SHIFT DATA - PASS TO PASS (MEASURED DEPTH) BASELINE CURVE FOR SHIFTS LDWG CURVE CODE: GR PASS NUMBER: 1 BASELINE DEPTH 88888.0 5867.0 5852.5 5849.5 5841.0 5837.5 5810.0 5799.0 5797.0 5789.5 5780 0 5774 5 5774 0 5756 5 5745 0 5742 5 5721.5 5704.5 5699.5 5673.0 5651.5 5638.0 5615.5 5612.0 5605. 0 5584.0 5577.0 5548.5 5547.0 5525.0 5515.5 5507.5 5478.0 5474.5 5469.0 5446.0 .......... EQUIVALENT UNSHIFTED DEPTH .......... GRCH TDTP 88900.5 5879.5 5860.5 5851.0 5823.5 5811.5 5796.0 5789.5 5759.5 5756.0 5713.5 5665.5 5654.5 5627.5 5599.5 5561.0 5536.5 5519.5 5492.0 5489.0 5483.5 88901.5 5866.0 5856.5 5811.5 5803.0 5786.0 5770.5 5734.5 5718.0 5684.5 5625.5 5613.5 5588.0 5559.0 5521.0 5477.5 5455.5 LIS Tape Verification Listing Schlumberger Alaska Computing Center 16-JUN-1997 16:49 PAGE: 22 5440.5 5419.0 5390.0 5389.0 5376.5 5364.5 5360.5 5353.0 5344.0 5329.0 5325.0 5319.5 5306.0 5302.0 5292.0 5288.0 5257.0 5237.0 5222 0 5217 5 5198 5 5158 0 5157 5 5131 5 5108 0 5107 5 5092.5 5089.5 5057.5 5053.5 5034.5 5022.5 5003.5 4998.5 4988.0 4978.5 4970.5 4967.5 4952.5 4941.5 4940.5 4920.5 4914.5 4913.5 4899.0 4874.0 4865.0 4855.5 4836.0 4816.5 4815.0 4790.0 4759.0 4758.5 4749.0 5455.5 5433.0 5404.0 5391.5 5373.5 5367.0 5337.5 5330.0 5316.5 5314.5 5303.5 5269.5 5250.0 5169.0 5143.0 5121.5 5102.0 5066.0 5047.5 5015.5 5011.0 5001.5 4984.0 4968.0 4954.5 4937.0 4929.0 4912.0 4888.0 4877.5 4848.5 4829.0 4802.0 4772.0 4762.5 5403.5 5378.5 5357.5 5339.5 5301.0 5234.5 5231.0 5208.0 5169.0 5119.5 5106.0 5070.5 5037.0 4991.5 4980.0 4955.5 4927.5 4868.5 4827.5 4773.0 LIS Tape Verification Listing Schlumberger Alaska Computing Center 16-JUN-1997 16:49 PAGE: 23 4722.0 4721.0 4693.0 4667.0 4666.5 4636.5 4623.5 4597.5 4577.5 4576.0 4562.0 4557.0 4555.5 4538.5 4535 5 4533 5 4504 0 4493 5 4493 0 4473 0 4446 5 4443 0 4431.0 4423.0 4419.0 4394.5 4385.0 4371.0 4361.5 4353.5 4330.5 4305.5 4298.0 4264.5 4241 0 4240 0 4222 5 4220 0 4210 5 4204 0 4192, 0 4175.0 4169.5 4148.0 4134.5 4129.5 4114.5 4093.0 4069.0 4061.5 4050.0 4048.0 4028.5 4025.0 4022.5 4734.0 4705.5 4679.0 4647.5 4607.0 4586.0 4570.5 4562.5 4549.0 4543.0 4513.5 4504.5 4485.0 4459.5 4444.0 4438.0 4385.5 4368.0 4346.5 4319.5 4277.0 4252.0 4231.0 4221.0 4204.0 4186.0 4181.5 4141.5 4125.0 4105.5 4071.5 4058.0 4035.0 4733.0 4679.0 4632.5 4587.5 4565.0 4544.0 4504.0 4455.0 4428.5 4406.5 4393.5 4368.5 4304.5 4249.0 4234.5 4217.5 4202.5 4180.0 4158.5 4146.5 4080.0 4063.0 4039.0 4032.0 LIS Tape Verification Listing Schlumberger Alaska Computing Center 16-JUN-1997 16:49 PAGE: 24 4001.0 4009.5 3996.5 4004.0 100.0 108.5 107.5 $ REMARKS: This file contains Borax Pass #2 of the TDTP. The depth adjustments shown above reflect Borax Pass #2 GRCH to Base Pass #1 GRCH and Borax Pass #2 SIGMA to Base Pass #1 SIGMA. Ail other TDTP curves were carried with the SIGMA shifts. $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 92 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 11 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 100713 O0 000 O0 0 4 1 1 4 68 0000000000 SIGM TDTP CU 100713 O0 000 O0 0 4 1 1 4 68 0000000000 TPHI TDTP PU-S 100713 O0 000 O0 0 4 1 1 4 68 0000000000 SBHF TDTP CU 100713 O0 000 O0 0 4 1 1 4 68 0000000000 SBHN TDTP CU 100713 O0 000 O0 0 4 1 1 4 68 0000000000 SIGC TDTP CU 100713 O0 000 O0 0 4 1 1 4 68 0000000000 SIBH TDTP CU 100713 O0 000 O0 0 4 1 1 4 68 0000000000 TRAT TDTP 100713 O0 000 O0 0 4 1 1 4 68 0000000000 LCO1 TDTP 100713 O0 000 O0 0 4 1 1 4 68 0000000000 LIS Tape Verification Listing Schlumberger Alaska Computing Center 16-JUN-1997 16:49 PAGE: 25 NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) SDSI TDTP CU 100713 O0 000 O0 0 4 I 1 4 68 0000000000 BACK TDTP CPS 100713 O0 000 O0 0 4 1 1 4 68 0000000000 FBAC TDTP CPS 100713 O0 000 O0 0 4 1 1 4 68 0000000000 TCAN TDTP CPS 100713 O0 000 O0 0 4 1 1 4 68 0000000000 TCAF TDTP CPS 100713 O0 000 O0 0 4 1 1 4 68 0000000000 TCND TDTP CPS 100713 O0 000 O0 0 4 1 1 4 68 0000000000 TCFD TDTP CPS 100713 O0 000 O0 0 4 1 1 4 68 0000000000 TSCN TDTP CPS 100713 O0 000 O0 0 4 1 1 4 68 0000000000 TSCF TDTP CPS 100713 O0 000 O0 0 4 1 1 4 68 0000000000 INND TDTP CPS 100713 O0 000 O0 0 4 1 1 4 68 0000000000 INFD TDTP CPS 100713 O0 000 O0 0 4 1 1 4 68 0000000000 GRCH TDTP GAPI 100713 O0 000 O0 0 4 1 1 4 68 0000000000 TENS TDTP LB 100713 O0 000 O0 0 4 1 1 4 68 0000000000 CCL TDTP V 100713 O0 000 O0 0 4 1 1 4 68 0000000000 ** DATA ** DEPT. 5917. 500 SIGM. TDTP -999.250 TPHI. TDTP -999.250 SBHF. TDTP SBHN. TDTP -999.250 SIGC. TDTP -999.250 SIBH. TDTP -999.250 TRAT. TDTP LCO1 . TDTP -999.250 SDSI. TDTP -999.250 BACK. TDTP -999.250 FBAC. TDTP TCAN. TDTP -999. 250 TCAF. TDTP -999. 250 TCND. TDTP -999. 250 TCFD. TDTP TSCN. TDTP -999.250 TSCF. TDTP -999.250 INND. TDTP -999.250 INFD. TDTP GRCH. TDTP 22.203 TENS. TDTP -999.250 CCL. TDTP -999.250 DEPT. 4001. 500 SIGM. TDTP 31. 606 TPHI. TDTP 45. 553 SBHF. TDTP SBHN. TDTP 89. 576 SIGC. TDTP 1. 713 SIBH. TDTP 113. 003 TRAT. TDTP LCO1 . TDTP 2. 686 SDSI. TDTP 2. 099 BACK. TDTP 113. 376 FBAC. TDTP TCAN. TDTP 6458. 454 TCAF. TDTP 2265. 903 TCND. TDTP 9032.127 TCFD. TDTP TSCN. TDTP 700. 197 TSCF. TDTP 260. 654 INND. TDTP 2491. 981 INFD. TDTP GRCH. TDTP -999. 250 TENS. TDTP 790. 000 CCL. TDTP 0. 000 -999.250 -999.250 -999.250 -999.250 -999.250 77.999 1.492 19.426 2482.312 301.786 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .004 SERVICE : FLIC VERSION · O01CO1 DATE : 97/06/16 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : LIS Tape Verification Listing Schlumberger Alaska Computing Center 16-JUN-1997 16:49 PAGE: 2 6 **** FILE HEADER **** FILE NAME : EDIT .005 SERVICE : FLIC VERSION : O01CO1 DATE : 97/06/16 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER: 5 AVERAGED CURVES Pulsed Neutron: Unaveraged edited Pass 1 Gamma Ray and backround counts; arithmetic average of edited static baseline passes for all other curves. DEPTH INCREMENT 0.5000 PASSES INCLUDED IN AVERAGE LDWG TOOL CODE PASS NUMBERS .......................... 1, 2 TDTP $ REMARKS: The arithmetic average of passes 1 & 2 was computed after all depth shifts and clipping was applied. $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 84 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 12 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 LIS Tape Verification Listing Schlumberger Alaska Computing Center 16-JUN-1997 16:49 PAGE: 27 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELE~ CODE (HEX) DEPT FT 100713 O0 000 O0 0 5 1 1 4 68 0000000000 SIGM PNAV CU 100713 O0 000 O0 0 5 1 1 4 68 0000000000 TPHI PNAV PU-S 100713 O0 000 O0 0 5 1 1 4 68 0000000000 SBHF PNAV CU 100713 O0 000 O0 0 5 1 1 4 68 0000000000 SBHNPNAV CU 100713 O0 000 O0 0 5 1 1 4 68 0000000000 SIGC PNAV CU 100713 O0 000 O0 0 5 1 1 4 68 0000000000 SIBH PNAV CU 100713 O0 000 O0 0 5 1 1 4 68 0000000000 TRAT PNAV 100713 O0 000 O0 0 5 1 1 4 68 0000000000 SDSI PNAV CU 100713 O0 000 O0 0 5 1 1 4 68 0000000000 BACK TDTP CPS 100713 O0 000 O0 0 5 1 1 4 68 0000000000 FBAC TDTP CPS 100713 O0 000 O0 0 5 1 1 4 68 0000000000 TCANPNAV CPS 100713 O0 000 O0 0 5 1 1 4 68 0000000000 TCAF PNAV CPS 100713 O0 000 O0 0 5 1 1 4 68 0000000000 TCND PNAV CPS 100713 O0 000 O0 0 5 1 1 4 68 0000000000 TCFD PNAV CPS 100713 O0 000 O0 0 5 1 1 4 68 0000000000 TSCN PNAV CPS 100713 O0 000 O0 0 5 1 1 4 68 0000000000 TSCF PNAV CPS 100713 O0 000 O0 0 5 1 1 4 68 0000000000 INND PNAV CPS 100713 O0 000 O0 0 5 1 1 4 68 0000000000 INFD PNAV CPS 100713 O0 000 O0 0 5 1 1 4 68 0000000000 LCO1 PNAV 100713 O0 000 O0 0 5 1 1 4 68 0000000000 GRCH TDTP GAPI 100713 O0 000 O0 0 5 1 1 4 68 0000000000 ** DATA ** DEPT. 5911.000 SIGM. PNAV -999.250 TPHI.PNAV -999.250 SBHF. PNAV SBHN. PNAV -999.250 SIGC. PNAV -999.250 SIBH. PNAV -999.250 TRAT. PNAV SDSI.PNAV -999.250 BACK. TDTP -999.250 FBAC. TDTP -999.250 TCAN. PNAV TCAF. PNAV -999.250 TCND.PNAV -999.250 TCFD. PNAV -999.250 TSCN. PNAV TSCF. PNAV -999.250 INND.PNAV -999.250 INFD. PNAV -999.250 LCO1.PNAV GRCH. TDTP 19. 281 DEPT. 2010.500 SIGM. PNAV 29.838 TPHI.PNAV 73.068 SBHF. PNAV SBHN. PNAV 61.975 SIGC. PNAV 2.136 SIBH. PNAV 68.835 TRAT. PNAV SDSI. PNAV 1 . 496 BACK. TDTP 127. 555 FBAC. TDTP 17. 878 TCAN. PNAV TCAF. PNAV 3794.638 TCND.PNAV 14385.014 TCFD.PNAV 3201.473 TSCN. PNAV TSCF. PNAV 501.618 INND.PNAV 2276.882 INFD.PNAV 259.309 LCO1.PNAV GRCH. TDTP 9. 266 -999.250 -999.250 -999.250 -999.250 -999.250 53.633 2.228 15162.633 1873.979 3.741 ** END OF DATA ** LIS Tape Verification Listing Schlumberger Alaska Computing Center 16-JUN-1997 16:49 PAGE: 28 **** FILE TRAILER **** FILE NAME : EDIT .005 SERVICE : FLIC VERSION : O01CO1 DATE : 97/06/16 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .006 SERVICE · FLIC VERSION : O01CO1 DATE : 97/06/16 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER 6 RAW CURVES Curves and log header data for each pass in separate files; raw background pass in last file PASS NUMBER: 1 DEPTH INCREMENT: 0.5000 FILE SUM~zARY VENDOR TOOL CODE START DEPTH STOP DEPTH 5931 . 5 2005.0 TDTP $ LOG HEADER DATA DATE LOGGED: 27-MAR-97 SOFTWARE VERSION: CP 44.2 TIME LOGGER ON BOTTOM: 543 26-MAR-97 TD DRILLER (FT) : 5901.0 TD LOGGER (FT) : 5922.0 TOP LOG INTERVAL (FT): 2000.0 BOTTOM LOG INTERVAL (FT) : 5922.0 LOGGING SPEED (FPHR) : 1800.0 DEPTH CONTROL USED (YES/NO): YES TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER TDTP PROD. LOGGING SONDE CPLS 778 TDTP CPLH 1700 TDTP GAFk~A RAY SOURCE CGRS 820 TDTP THERMAL DECAY TOOL CTSM 328 $ LIS Tape Verification Listing Schlumberger Alaska Computing Center 16-JUN-1997 16:49 PAGE: 29 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLERS CASING DEPTH (FT) : LOGGERS CASING DEPTH (FT) : 6992.0 BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE TE~IPERATURE (DEGF) : BOTTOM HOLE TE~IPERATURE (DEGF) : FLUID SALINITY (PPM) : FLUID LEVEL (FT) : FLUID RATE AT WELLHEAD (BPM): WATER CUTS (PCT) : GAS~OIL RATIO: CHOKE (DEG) : HOT SEAWATER -35.0 NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): THERMAL SANDSTONE 2.65 BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE TOP NORMALIZING WINDOW (FT) : BASE NORMALIZING WINDOW (FT) : BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (CPS) : 0 FAR COUNT RATE HIGH SCALE (CPS) : 13000 NEAR COUNT RATE LOW SCALE (CPS) : 0 NEAR COUNT RATE HIGH SCALE (CPS): 30000 TOOL STANDOFF (IN): 1.0 REFIARKS: THIS FILE CONTAINS THE RAW DATA FOR PASS #1. TIED INTO SWS TE~P SURVEY DATED MARCH 20, 1997. PUMPED 1700 BARRELS OF HOT SEAWATER. FREEZE PROTECTED AND START FIRST PASS AT 22:30 START SECOND PASS AT 01:30 START THIRD PASS AT 04:30 8337 CREW AVRAM LEVY & KEVIN HUSEMAN $ LIS FORMAT DATA LIS Tape Verification Listing Schlumberger Alaska Computing Center 16-JUN-1997 16:49 PAGE: 3O ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 92 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 11 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** ....................................................................................... NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) ....................................................................................... DEPT FT 100713 O0 000 O0 0 6 1 1 4 68 0000000000 SIGM PS1 CU 100713 O0 000 O0 0 6 1 1 4 68 0000000000 TPHI PS1 PU 100713 O0 000 O0 0 6 1 1 4 68 0000000000 SBHF PS1 CU 100713 O0 000 O0 0 6 1 1 4 68 0000000000 SBHN PS1 CU 100713 O0 000 O0 0 6 1 1 4 68 0000000000 SIGC PS1 CU 100713 O0 000 O0 0 6 1 1 4 68 0000000000 SIBH PS1 CU 100713 O0 000 O0 0 6 1 1 4 68 0000000000 TRAT PS1 100713 O0 000 O0 0 6 1 1 4 68 0000000000 LCO1 PS1 100713 O0 000 O0 0 6 1 1 4 68 0000000000 SDSI PS1 CU 100713 O0 000 O0 0 6 1 1 4 68 0000000000 BACK PS1 CPS 100713 O0 000 O0 0 6 1 1 4 68 0000000000 FBAC PS1 CPS 100713 O0 000 O0 0 6 1 1 4 68 0000000000 TCANPS1 CPS 100713 O0 000 O0 0 6 1 1 4 68 0000000000 TCAF PS1 CPS 100713 O0 000 O0 0 6 1 1 4 68 0000000000 TCND PS1 CPS 100713 O0 000 O0 0 6 1 1 4 68 0000000000 TCFD PS1 CPS 100713 O0 000 O0 0 6 1 1 4 68 0000000000 TSCN PS1 CPS 100713 O0 000 O0 0 6 1 1 4 68 0000000000 TSCF PS1 CPS 100713 O0 000 O0 0 6 1 1 4 68 0000000000 INND PS1 CPS 100713 O0 000 O0 0 6 1 1 4 68 0000000000 INFD PS1 CPS 100713 O0 000 O0 0 6 1 1 4 68 0000000000 TENS PS1 LB 100713 O0 000 O0 0 6 1 1 4 68 0000000000 GR PS1 GAPI 100713 O0 000 O0 0 6 1 1 4 68 0000000000 CCL PS1 V 100713 O0 000 O0 0 6 1 1 4 68 0000000000 LIS Tape Verification Listing Schlumberger Alaska Computing Center 16-JUN-1997 16:49 PAGE: 31 ** DATA ** DEPT. 5931.500 SIGM. PS1 SBHN. PS1 121.802 SIGC. PS1 LCO1.PS1 3.024 SDSI.PS1 TCAN. PS1 34469.430 TCAF. PS1 TSCN. PS1 4177.008 TSCF. PS1 TENS. PSI 925.000 GR.PS1 DEPT. 2005.000 SIGM. PS1 SBHN. PS1 61.274 SIGC. PS1 LCO1.PSl 4.062 SDSI.PS1 TCAN. PS1 15021.688 TCAF. PS1 TSCN. PS1 1856.215 TSCF. PS1 TENS. PSi 740.000 GR.PS1 32.653 TPHI.PS1 57.352 SBHF. PS1 0.000 SIBH. PS1 164.573 TRAT. PS1 3.668 BACK. PSi 121.334 FBAC. PS1 11198.098 TCND. PS1 25185.512 TCFD. PS1 1381.116 INND.PS1 1617.504 INFD.PS1 22.281 CCL.PS1 0.000 92.222 1.784 33.655 7153.011 379.440 33.254 TPHI.PS1 81.193 SBHF. PS1 60.763 0.136 SIBH. PS1 67.714 TRAT. PS1 2.336 1.686 BACK. PSi 128.347 FBAC. PS1 18.237 3610.091 TCND.PS1 14273.400 TCFD.PS1 3095.519 456.919 INND.PS1 2112.848 INFD.PS1 252.508 10.563 CCL.PS1 0.000 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .006 SERVICE : FLIC VERSION : O01CO1 DATE : 97/06/16 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .007 SERVICE : FLIC VERSION : O01CO1 DATE : 97/06/16 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER 7 RAW CURVES Curves and log header data for each pass in separate files; raw background pass in last file PASS NUMBER: 2 DEPTH INCREMENT: 0.5000 FILE SUMFiARY VENDOR TOOL CODE START DEPTH STOP DEPTH TDTP 5931 . 5 2001 . 5 $ LIS Tape Verification Listing Schlumberger Alaska Computing Center 16-JUN-1997 16:49 PAGE: 32 LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME LOGGER ON BOTTOM: TD DRILLER (FT) : TD LOGGER (FT) : TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): LOGGING SPEED (FPHR): DEPTH CONTROL USED (YES/NO): 27-MAR-97 CP 44.2 543 26-MAR-97 5901.0 5922.0 2000.0 5922.0 1800.0 YES TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TDTP PROD. LOGGING SONDE TDTP TDTP GAMMA RAY SOURCE TDTP THERMAL DECAY TOOL $ TOOL NUMBER CPLS 778 CPLH 1700 CGRS 820 CTSM 328 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLERS CASING DEPTH (FT) : LOGGERS CASING DEPTH (FT) : 6992.0 BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE TEMPERATURE (DEGF) : BOTTOM HOLE TEMPERATURE (DEGF): FLUID SALINITY (PPM) : FLUID LEVEL (FT) : FLUID RATE AT WELLHEAD (BPM) : WATER CUTS (PCT) : GAS~OIL RATIO: CHOKE (DEG) : HOT SEAWATER -35.0 NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): THERMAL SANDSTONE 2.65 BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE TOP NORMALIZING WINDOW (FT): BASE NORMALIZING WINDOW (FT): BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (CPS): 0 FAR COUNT RATE HIGH SCALE (CPS): 13000 NEAR COUNT RATE LOW SCALE (CPS): 0 NEAR COUNT RATE HIGH SCALE (CPS): 30000 TOOL STANDOFF (IN): 1.0 LIS Tape Verification Listing Schlumberger Alaska Computing Center 16-JUN-1997 16:49 PAGE: 33 REMARKS: THIS FILE CONTAINS THE RAW DATA FOR PASS #2. TIED INTO SWS TE~P SURVEY DATED MARCH 20, 1997. PUMPED 1700 BARRELS OF HOT SEAWATER. FREEZE PROTECTED AND START FIRST PASS AT 22:30 START SECOND PASS AT O1:30 START THIRD PASS AT 04:30 8337 CREW AVRAPI LEVY & KEVIN HUSEMAN $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE- 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 92 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 11 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 100713 O0 000 O0 0 7 1 1 4 68 0000000000 SIGM PS2 CU 100713 O0 000 O0 0 7 1 1 4 68 0000000000 TPHI PS2 PU 100713 O0 000 O0 0 7 1 1 4 68 0000000000 SBHF PS2 CU 100713 O0 000 O0 0 7 1 1 4 68 0000000000 SBHNPS2 CU 100713 O0 000 O0 0 7 1 1 4 68 0000000000 SIGC PS2 CU 100713 O0 000 O0 0 7 1 1 4 68 0000000000 SIBH PS2 CU 100713 O0 000 O0 0 7 1 1 4 68 0000000000 TRAT PS2 100713 O0 000 O0 0 7 1 1 4 68 0000000000 LCO1 PS2 100713 O0 000 O0 0 7 1 1 4 68 0000000000 SDSI PS2 CU 100713 O0 000 O0 0 7 1 1 4 68 0000000000 LIS Tape Verification Listing Schlumberger Alaska Computing Center 16-JUN-1997 16:49 PAGE: 34 NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) BACK PS2 CPS 100713 O0 000 O0 0 7 1 1 4 68 0000000000 FBAC PS2 CPS 100713 O0 000 O0 0 7 1 1 4 68 0000000000 TCANPS2 CPS 100713 O0 000 O0 0 7 I 1 4 68 0000000000 TCAF PS2 CPS 100713 O0 000 O0 0 7 1 1 4 68 0000000000 TCND PS2 CPS 100713 O0 000 O0 0 7 1 1 4 68 0000000000 TCFD PS2 CPS 100713 O0 000 O0 0 7 1 1 4 68 0000000000 TSCN PS2 CPS 100713 O0 000 O0 0 7 1 1 4 68 0000000000 TSCF PS2 CPS 100713 O0 000 O0 0 7 1 1 4 68 0000000000 INND PS2 CPS 100713 O0 000 O0 0 7 1 1 4 68 0000000000 INFD PS2 CPS 100713 O0 000 O0 0 7 1 1 4 68 0000000000 TENS PS2 LB 100713 O0 000 O0 0 7 1 1 4 68 0000000000 GR PS2 GAPI 100713 O0 000 O0 0 7 1 1 4 68 0000000000 CCL PS2 V 100713 O0 000 O0 0 7 1 1 4 68 0000000000 ** DATA ** DEPT. 5931.500 SIGM. PS2 22.725 TPHI.PS2 0.000 SBHF. PS2 SBHN. PS2 106.177 SIGC. PS2 0.000 SIBH. PS2 121.361 TRAT. PS2 LCO1.PS2 891.643 SDSI.PS2 0.223 BACK. PS2 371.759 FBAC. PS2 TCAN. PS2 6535.440 TCAF. PS2 0.000 TCND.PS2 7915.674 TCFD.PS2 TSCN. PS2 891.643 TSCF. PS2 0.000 INND.PS2 552.337 INFD.PS2 TENS. PS2 845.000 GR.PS2 22.266 CCL.PS2 0.000 DEPT. 2001.500 SIGM. PS2 34.708 TPHI.PS2 77.324 SBHF. PS2 SBHN. PS2 60.973 SIGC. PS2 1.831 SIBH. PS2 67.233 TRAT. PS2 LCO1.PS2 4.041 SDSI.PS2 1.677 BACK. PS2 135.855 FBAC. PS2 TCAN. PS2 13315.639 TCAF. PS2 3179.798 TCND.PS2 13690.650 TCFD. PS2 TSCN. PS2 1535.024 TSCF. PS2 379.907 INND.PS2 1962.618 INFD.PS2 TENS.PS2 755.000 GR.PS2 17.766 CCL.PS2 0.000 107.604 0.000 40.513 -248.407 -1.377 57.834 2.178 19.263 2953.311 258.102 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .007 SERVICE : FLIC VERSION : O01CO1 DATE : 97/06/16 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : LIS Tape Verification Listing Schlumberger Alaska Computing Center 16-JUN-1997 16:49 PAGE: 35 **** FILE HEADER **** FILE NAME : EDIT .008 SERVICE : FLIC VERSION : O01CO1 DATE : 97/06/16 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER 8 RAW CURVES Curves and log header data for each pass in separate files; raw background pass in last file PASS NUMBER: 3 DEPTH INCREMENT: 0.5000 FILE SUMF1ARY VENDOR TOOL CODE START DEPTH ........................... TDTP 5932.0 $ LOG HEADER DATA STOP DEPTH 3929.0 DATE LOGGED: SOFTWARE VERSION: TIME LOGGER ON BOTTOM: TD DRILLER (FT) : TD LOGGER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : LOGGING SPEED (FPHR): DEPTH CONTROL USED (YES/NO) TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE ......................... TDTP PROD. LOGGING SONDE TDTP TDTP GA~W~A RAY SOURCE TDTP THERMAL DECAY TOOL $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLERS CASING DEPTH (FT): LOGGERS CASING DEPTH (FT) : BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE TEMPERATURE (DEGF) : BOTTOM HOLE TEMPERATURE (DEGF) : 27-MAR-97 CP 44.2 543 26-MAR-97 5901.0 5922.0 2000.0 5922.0 1800.O YES TOOL NUMBER CPLS 778 CPLH 1700 CGRS 820 CTSM 328 6992.0 BORAX -35.0 LIS Tape Verification Listing Schlumberger Alaska Computing Center 16-JIIN-1997 16:49 PAGE: 36 FLUID SALINITY (PPM) : FLUID LEVEL (FT) : FLUID RATE AT WELLHEAD (BPM) : WATER CUTS (PCT) : GAS~OIL RATIO: CHOKE (DEG) : NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): THERMAL SANDSTONE 2.65 BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE TOP NORMALIZING WINDOW (FT) : BASE NORMALIZING WINDOW (FT): BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (CPS): 0 FAR COUNT RATE HIGH SCALE (CPS): 13000 NEAR COUNT RATE LOW SCALE (CPS): 0 NEAR COUNT RATE HIGH SCALE (CPS): 30000 TOOL STANDOFF (IN): 1.0 REFIARKS: THIS FILE CONTAINS THE RAW DATA FOR PASS #3. TIED INTO SWS TEMP SURVEY DATED MARCH 20, 1997. PUMPED 1700 BARRELS OF HOT SEAWATER. FREEZE PROTECTED AND START FIRST PASS AT 22:30 START SECOND PASS AT O1:30 START THIRD PASS AT 04:30 8337 CREW AVRAM LEVY & KEVIN HUSEMAN $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE- 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 92 4 66 1 5 66 6 73 7 65 8 68 O. 5 9 65 FT LIS Tape Verification Listing Schlumberger Alaska Computing Center 16-JUN-1997 16:49 PAGE 37 TYPE REPR CODE VALUE 11 66 11 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 100713 O0 000 O0 0 8 1 1 4 68 0000000000 SIGM BX1 CU 100713 O0 OOO O0 0 8 1 1 4 68 0000000000 TPHI EX1 PU 100713 O0 000 O0 0 8 1 1 4 68 0000000000 SBHF EX1 CU 100713 O0 000 O0 0 8 1 1 4 68 0000000000 SBHN BX1 CU 100713 O0 000 O0 0 8 1 1 4 68 0000000000 SIGC EX1 CU 100713 O0 000 O0 0 8 1 1 4 68 0000000000 SIBH BX1 CU 100713 O0 000 O0 0 8 1 1 4 68 0000000000 TRAT BX1 100713 O0 000 O0 0 8 1 1 4 68 0000000000 LCO1 BX1 100713 O0 000 O0 0 8 1 1 4 68 0000000000 SDSI BX1 CU 100713 O0 000 O0 0 8 1 1 4 68 0000000000 BACK BXl CPS 100713 O0 000 O0 0 8 1 1 4 68 0000000000 FBAC BX1 CPS 100713 O0 000 O0 0 8 1 1 4 68 0000000000 TCANBX1 CPS 100713 O0 000 O0 0 8 1 1 4 68 0000000000 TCAF BX1 CPS 100713 O0 000 O0 0 8 1 1 4 68 0000000000 TCNDBX1 CPS 100713 O0 000 O0 0 8 1 1 4 68 0000000000 TCFD BX1 CPS 100713 O0 000 O0 0 8 1 1 4 68 0000000000 TSCN BX1 CPS 100713 O0 000 O0 0 8 1 1 4 68 0000000000 TSCF BX1 CPS 100713 O0 000 O0 0 8 1 1 4 68 0000000000 INNDBX1 CPS 100713 O0 000 O0 0 8 1 1 4 68 0000000000 INFD BX1 CPS 100713 O0 000 O0 0 8 1 1 4 68 0000000000 TENS EX1 LB 100713 O0 000 O0 0 8 1 1 4 68 0000000000 GR BX1 GAPI 100713 O0 000 O0 0 8 1 1 4 68 0000000000 CCL BX1 V 100713 O0 000 O0 0 8 1 1 4 68 0000000000 ** DATA ** DEPT. 5932.000 SIGM. BX1 22.605 TPHI.BX1 0.000 SBHF. BX1 SBHN. BX1 119.526 SIGC.BX1 0.000 SIBH. BX1 138.354 TRAT. BX1 LCO1.BX1 0.000 SDSI.BXl 0.890 BACK.BX1 48.717 FBAC. BX1 TCAN. BX1 0.000 TCAF.BX1 0.000 TCND.BX1 -572.095 TCFD.BX1 TSCN. BX1 0.000 TSCF. BX1 0.000 INND.BX1 -1.656 INFD.BX1 TENS.BX1 715.000 GR.BX1 18.609 CCL.BX1 0.000 117.231 O. 000 15.160 -187. 269 -0.515 LIS Tape Verification Listing Schlumberger Alaska Computing Center 16-JUN-1997 16:49 PAGE: 38 DEPT. 3929.000 SIGM. BX1 SBHN. BX1 96.363 SIGC.BX1 LCO1.BX1 2.137 SDSI.BX1 TCAN. BX1 5024.953 TCAF. BX1 TSCN. BX1 1081.341 TSCF. BXl TENS.BX1 835.000 GR.BX1 23.254 TPHI.BX1 25.557 SBHF. BX1 81.486 0.009 SIBH. BX1 123.399 TRAT. BX1 1.344 1.246 BACK. BX1 120.516 FBAC. BX1 16.962 2351.318 TCND.BX1 10065.365 TCFD.BX1 3078.059 505.990 INND.BX1 3048.220 INFD.BX1 331.141 29.859 CCL.BX1 0.000 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .008 SERVICE · FLIC VERSION : O01CO1 DATE : 97/06/16 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .009 SERVICE : FLIC VERSION · O01CO1 DATE : 97/06/16 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER 9 RAW CURVES Curves and log header data for each pass in separate files; raw background pass in last file PASS NUMBER: 4 DEPTH INCREMENT: O. 5000 FILE SU~WZARY VENDOR TOOL CODE START DEPTH TDTP 5921.5 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME LOGGER ON BOTTOM: TD DRILLER (FT) : TD LOGGER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : STOP DEPTH 3985.5 27-MAR-97 CP 44.2 543 26-MAR-97 5901.0 5922.0 2000.0 5922.0 LIS Tape Verification Listing Schlumberger Alaska Computing Center 16-JUN-1997 16:49 PAGE: 39 LOGGING SPEED (FPHR): DEPTH CONTROL USED (YES/NO) 1800.0 YES TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE ......................... TDTP PROD. LOGGING SONDE TDTP TDTP GAiV~IA RAY SOURCE TDTP THERMAL DECAY TOOL $ TOOL NUMBER CPLS 778 CPLH 1700 CGRS 820 CTSM 328 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLERS CASING DEPTH (FT) : LOGGERS CASING DEPTH (FT) : 6992.0 BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE TEMPERATURE (DEGF) : BOTTOM HOLE TEMPERATURE (DEGF) : FLUID SALINITY (PPM) : FLUID LEVEL (FT) : FLUID RATE AT WELLHEAD (BPM) : WATER CUTS (PCT) : GAS~OIL RATIO: CHOKE (DEG) : ' BORAX -35.0 NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): THERMAL SANDSTONE 2.65 BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE TOP NORMALIZING WINDOW (FT): BASE NORMALIZING WINDOW (FT) : BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (CPS): 0 FAR COUNT RATE HIGH SCALE (CPS): 13000 NEAR COUNT RATE LOW SCALE (CPS): 0 NEAR COUNT RATE HIGH SCALE (CPS): 30000 TOOL STANDOFF (IN): 1.0 RE~ARKS: THIS FILE CONTAINS THE RAW DATA FOR PASS #4. TIED INTO SWS TEMP SURVEY DATED MARCH 20, 1997. PUMPED 1700 BARRELS OF HOT SEAWATER. FREEZE PROTECTED AND START FIRST PASS AT 22:30 START SECOND PASS AT 01:30 START THIRD PASS AT 04:30 8337 CREW AVRAM LEVY & KEVIN HUSEMAN LIS Tape Verification Listing Schlumberger Alaska Computing Center 16-JUN-1997 16:49 PAGE: 4O LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE- 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 92 4 66 1 $ 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 11 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 100713 O0 000 O0 0 9 1 1 4 68 0000000000 SIGM BX2 CU 100713 O0 000 O0 0 9 1 1 4 68 0000000000 TPHI BX2 PU 100713 O0 000 O0 0 9 1 1 4 68 0000000000 SBHF BX2 CU 100713 O0 000 O0 0 9 1 1 4 68 0000000000 SBHNBX2 CU 100713 O0 000 O0 0 9 1 1 4 68 0000000000 SIGC BX2 CU 100713 O0 000 O0 0 9 1 1 4 68 0000000000 SIBH BX2 CU 100713 O0 000 O0 0 9 1 1 4 68 0000000000 TRAT BX2 100713 O0 000 O0 0 9 1 1 4 68 0000000000 LCO1 BX2 100713 O0 000 O0 0 9 1 1 4 68 0000000000 SDSI BX2 CU 100713 O0 000 O0 0 9 1 1 4 68 0000000000 BACK BX2 CPS 100713 O0 000 O0 0 9 1 1 4 68 0000000000 FBAC BX2 CPS 100713 O0 000 O0 0 9 1 1 4 68 0000000000 TCANBX2 CPS 100713 O0 000 O0 0 9 1 1 4 68 0000000000 TCAF BX2 CPS 100713 O0 000 O0 0 9 1 1 4 68 0000000000 TCNDBX2 CPS 100713 O0 000 O0 0 9 1 1 4 68 0000000000 TCFD BX2 CPS 100713 O0 000 O0 0 9 1 1 4 68 0000000000 TSCN BX2 CPS 100713 O0 000 O0 0 9 1 1 4 68 0000000000 TSCF BX2 CPS 100713 O0 000 O0 0 9 1 1 4 68 0000000000 INND BX2 CPS 100713 O0 000 O0 0 9 1 1 4 68 0000000000 LIS Tape Verification Listing Schlumberger Alaska Computing Center 16-JUN-1997 16:49 PAGE: 41 NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) INFD BX2 CPS 100713 O0 000 O0 0 9 1 1 4 68 0000000000 TENS BX2 LB 100713 O0 000 O0 0 9 1 1 4 68 0000000000 GR BX2 GAPI 100713 O0 000 O0 0 9 1 1 4 68 0000000000 CCL BX2 V 100713 O0 000 O0 0 9 1 1 4 68 0000000000 ** DATA ** DEPT. 5921.500 SIGM. BX2 7.038 TPHI.BX2 0.000 SBHF. BX2 SBHN. BX2 116.679 SIGC. BX2 0.000 SIBH. BX2 134.729 TRAT.BX2 LCO1.BX2 0.000 SDSI.BX2 0.742 BACK. BX2 59.252 FBAC.BX2 TCAN. BX2 0.000 TCAF. BX2 0.000 TCND.BX2 -673.368 TCFD.BX2 TSCN. BX2 0.000 TSCF.BX2 0.000 INND.BX2 -2.014 INFD.BX2 TENS.BX2 1200.000 GR.BX2 22.203 CCL.BX2 0.000 DEPT. SBHN. BX2 LCO1.BX2 TCAN. BX2 TSCN. BX2 TENS.BX2 3985 500 91 839 2 400 6236 377 624 832 780 000 SIGM. BX2 33.561 TPHI.BX2 35.561 SBHF. BX2 SIGC.BX2 2.671 SIBH. BX2 116.626 TRAT. BX2 SDSI.BX2 2.249 BACK. BX2 117.025 FBAC. BX2 TCAF. BX2 2338.405 TCND.BX2 9087.887 TCFD.BX2 TSCF. BX2 260.329 INND.BX2 2829.086 INFD. BX2 GR.BX2 33.500 CCL.BX2 0.000 137.260 O. 000 17. 945 -210. 614 -0. 610 73. 711 1.287 18.114 2597. 391 321.549 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .009 SERVICE : FLIC VERSION : O01CO1 DATE : 97/06/16 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** TAPE TRAILER **** SERVICE NAME : EDIT DATE : 97/06/16 ORIGIN : FLIC TAPE NAME : 97235 CONTINUATION # : 1 PREVIOUS TAPE : COf~4ENT : ARCO ALASKA INC, D.S. 4-19, PRUDHOE BAY, 50-029-21791-00 LIS Tape Verification Listing Schlumberger Alaska Computing Center 16-JUN-1997 16:49 PAGE: 42 **** REEL TRAILER **** SERVICE NAME : EDIT DATE : 97/06/16 ORIGIN : FLIC REEL NAME : 97235 CONTINUATION # : PREVIOUS REEL : COM~ENT : ARCO ALASKA INC, D.S. 4~19, PRUDHOE BAY, 50-029-21791-00 * ALASKA COMPUTING CENTER * . ****************************** . ............................ . * ....... SCHLUMBERGER ....... * . ............................ . ****************************** COMPANY NAME : ARCO ALASKA, INC. WELL NAME : D.S. 4 - 19 FIELD NAME : PRUDHOE BAY BOROUGH : NORTH SLOPE STATE : ALASKA API NUMBER : 500292179100 REFERENCE NO : 96188 LIS Tape Verification Listing Schlumberger Alaska Computing Center 21-AUG-1996 17:25 PAGE: **** REEL HEADER **** SERVICE NAME : EDIT DATE : 96/08/21 ORIGIN : FLIC REEL NAME : 96188 CONTINUATION # : PREVIOUS REEL : CONfl~ENT : ARCO ALASKA INC, D.S. 4-19, PRUDHOE BAY, 50-029-21791-00 **** TAPE HEADER **** SERVICE NAME : EDIT DATE : 96/08/21 ORIGIN : FLIC TAPE NAME : 96188 CONTINUATION # : 1 PREVIOUS TAPE : COGENT : ARCO ALASKA INC, D.S. 4-19, PRUDHOE BAY, 50-029-21791-00 TAPE HEADER PRUDHOE BAY CASED HOLE WIRELINE LOGS WELL NAME: D.S. 4 - 19 API NUMBER: 5002921791 O0 OPERATOR: ARCO ALASKA, INC. LOGGING COMPANY: SCHLUMBERGER WELL SERVICES TAPE CREATION DATE: 16-AUG-96 JOB NUMBER: 96188 LOGGING ENGINEER: G. JOHNSON OPERATOR WITNESS: R. BURNO SURFACE LOCATION SECTION: 2 6 TOWNSHIP: 1 iN RANGE: 15E FNL: FSL: 908 FEL: FWL: 255 ELEVATION (FT FROM MSL O) KELLY BUSHING: 60. O0 DERRICK FLOOR: 59. O0 GROUND LEVEL: 21. O0 WELL CASING RECORD 1ST STRING 2ND STRING 3RD STRING PRODUCTION STRING OPEN HOLE CASING DRILLERS CASING BIT SIZE (IN) SIZE (IN) DEPTH (FT) WEIGHT (LB/FT) 9.625 6992.0 47.00 7.000 2993.0 26.00 5.500 3110.0 17.00 4.500 CURVE SHIFT DATA - ALL PASSES TO STANDARD(MEASURED DEPTH) LIS Tape Verification Listing Schlumberger Alaska Computing Center 21-AUG-1996 17:25 BASELINE CURVE FOR SHIFTS LDWG TOOL CODE: BCS LDWG CURVE CODE: GR RUN NUMBER: PASS NUMBER: DATE LOGGED: 06 -APR- 88 LOGGING COMPANY: BASELINE DEPTH 88888.0 5615.0 5593.5 5552.5 5517.5 5490.0 5489.5 5475.5 5457.0 5454.0 5452.5 5439.5 5438.0 5423.5 5413.5 5407.5 5406.5 5384.5 5379.0 5376.5 5367.0 5366.0 5357.0 5351.5 5316.0 5309.0 5302.5 5294.5 5284.0 5232.5 5215.5 5153.0 5136.0 5129.5 5123.5 5078.0 5071.0 5061.0 5045.0 5038.0 5029.5 5010.0 4995.5 4991.5 4953.0 .......... EQUIVALENT UNSHIFTED DEPTH .......... GRCH TDTP 88888.0 88886.0 5517.5 5489.0 5457.0 5455.0 5453.0 5437.0 5413.0 5408.0 5382.5 5377.5 5375.0 5366.5 5352.5 5315.0 5304.0 5298.0 5291.0 5278.0 5227.0 5209.5 5151.5 5133.5 5126.0 5121.0 5079.0 5070.5 5063.5 5045.0 5037.5 5030.5 5011.5 4997.0 4991.0 4954.0 5613.0 5590.0 5549.0 5488.5 5477.5 5441.5 5426.5 5408.0 5369.0 5358.0 PAGE: LIS Tape Verification Listing Schlumberger Alaska Computing Center 4937.0 4911 5 4869 5 4863 0 4850 0 4818 5 4789 0 4768 0 4757 0 4717.5 4707.0 4703.0 4685.0 4645.0 4642.5 4617.5 4592.0 4591.0 4561.5 4554.0 4550.0 4541.5 4520.5 4505.0 4470.0 4456.0 4415 0 4410 5 4357 0 4332 0 4320 0 4297 5 4282 0 4280 0 4253.0 4221.5 4215.5 4205.0 4194.0 4178.0 4160.5 4159.5 4139.5 4131.0 4107.0 4094.5 4082.0 4079.5 4058.5 4044.0 4031.5 4016.5 3957.0 3956.5 3942.0 3941.0 4935.5 4913.0 4863.0 4851.0 4769.5 4757.5 4709.0 4704.0 4683.5 4640.0 4616.5 4591.0 4540.0 4504.0 4410.0 4358.0 4320.5 4295.5 4280.0 4252.5 4216.5 4206.0 4159.5 4132.5 4110.0 4082.0 4044.5 4032.5 3956.5 3942.5 21-AUG-1996 17:25 4870.5 4820.0 4789.0 4718.5 4643.5 4586.0 4553.5 4549.0 4546.5 4520.5 4470.5 4456.0 4415.0 4333.0 4282.0 4221.0 4194.0 4179.0 4159.0 4139.0 4094.5 4080.0 4061.0 4015.5 3956.5 3942.0 PAGE: LIS Tape Verification Listing Schlumberger Alaska Computing Center 3938.0 3904 0 3899 0 3883 5 3882 0 3857 5 3850 0 3839 5 3833.5 3815.0 3808.5 3799.0 3789.5 3770.0 3763.0 3745.5 3735.5 3719.5 3716.5 3712.0 3696.0 3678.0 3666.0 3645.0 3611.5 3573.0 3571.5 3535.5 3504.0 3473.0 3458.5 3434.0 3432.0 3427.5 3398.5 3389.5 3364.5 3364.0 3360.5 3340.0 3312.0 3292.5 3260.0 3254.5 3249.5 3237.5 3185.5 3178.0 3172.5 3169.5 3159.5 3157.5 3148.0 3145.5 3133.5 3125.5 3940.0 3905.5 3885.5 3858.5 3813.0 3773.5 3738.0 3719.5 3718.0 3699.0 3667.5 3610.5 3573.0 3504.0 3432.0 3428.5 3368.5 3343.0 3300.5 3263.0 3254.0 3188.5 3172.0 3158.5 3148.0 3133.0 21-AUG-1996 17:25 3899.5 3886.0 3852.5 3840.5 3834.0 3813.5 3802.5 3794.5 3761.0 3740.5 3712.5 3678.0 3643.0 3571. 0 3534.5 3474.0 3459.0 3432.0 3400.0 3389.5 3363.5 3361.5 3312.5 3254.5 3239.0 3178.5 3170.0 3157.0 3144.0 3133.0 3124.5 PAGE: LIS Tape Verification Listing Schlumberger Alaska Computing Center 21-AUG-1996 17:25 3119.0 3120.0 3097.0 3096.5 3094.5 3098.0 100.0 103.5 99.5 REMARKS: This library diskette tape contains the LDWG formatted edit on ARCO Alaska Inc D.S. 4-19. The tape contains 1 baseline pass and Borax passes 3 and 4. Because only one baseline pass was run, the average pass is equal to pass 1. The depth adjustments shown above reflect cased hole GR to open hole BCS GR and cased hole SIGM to open hole GR. Ail other TDTP curves were carried with the SIGM shifts. $ PAGE: **** FILE HEADER **** FILE NAME : EDIT .001 SERVICE ' FLIC VERSION · O01CO1 DATE · 96/08/21 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER: 1 EDITED CURVES Depth shifted and clipped curves for each pass in separate files. PASS NUMBER: 1 DEPTH INCREMENT: O. 5000 FILE SUF~r~ARY LDWG TOOL CODE START DEPTH STOP DEPTH GRCH 5598.0 3090.0 TDTP 5624.0 3090.0 $ CURVE SHIFT DATA - PASS TO PASS (MEASURED DEPTH) BASELINE CURVE FOR SHIFTS LDWG CURVE CODE: GR PASS NUMBER: BASELINE DEPTH $ .......... EQUIVALENT UNSHIFTED DEPTH .......... GRCH TDTP REMARKS: This file contains TDTP Pass #1 (Base Pass #1). pass to pass shifts were applied to this data. $ No LIS Tape Verification Listing Schlumberger Alaska Computing Center 21-AUG-1996 17:25 PAGE: LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 96 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 10 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 0 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 500427 O0 000 O0 0 1 1 1 4 68 0000000000 SIGM TDTP CU 500427 O0 000 O0 0 1 1 1 4 68 0000000000 TPHI TDTP PU-S 500427 O0 000 O0 0 1 1 1 4 68 0000000000 SBHF TDTP CU 500427 O0 000 O0 0 1 1 1 4 68 0000000000 SBHN TDTP CU 500427 O0 000 O0 0 1 1 1 4 68 0000000000 SIGC TDTP CU 500427 O0 000 O0 0 1 1 1 4 68 0000000000 SIBH TDTP CU 500427 O0 000 O0 0 1 1 1 4 68 0000000000 TRAT TDTP 500427 O0 000 O0 0 1 1 1 4 68 0000000000 LCO1 TDTP 500427 O0 000 O0 0 1 1 1 4 68 0000000000 SDSI TDTP CU 500427 O0 000 O0 0 1 1 1 4 68 0000000000 BACK TDTP CPS 500427 O0 000 O0 0 1 1 1 4 68 0000000000 FBAC TDTP CPS 500427 O0 000 O0 0 1 1 1 4 68 0000000000 TCAN TDTP CPS 500427 O0 000 O0 0 1 1 1 4 68 0000000000 TCAF TDTP CPS 500427 O0 000 O0 0 1 1 1 4 68 0000000000 TCND TDTP CPS 500427 O0 000 O0 0 1 1 1 4 68 0000000000 TCFD TDTP CPS 500427 O0 000 O0 0 1 1 1 4 68 0000000000 TSCN TDTP CPS 500427 O0 000 O0 0 1 1 1 4 68 0000000000 TSCF TDTP CPS 500427 O0 000 O0 0 1 1 1 4 68 0000000000 INND TDTP CPS 500427 O0 000 O0 0 1 1 1 4 68 0000000000 INFD TDTP CPS 500427 O0 000 O0 0 1 1 1 4 68 0000000000 GRCH TDTP GAPI 500427 O0 000 O0 0 1 1 1 4 68 0000000000 LIS Tape Verification Listing Schlumberger Alaska Computing Center 21-AUG-1996 17:25 PAGE: NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) TENS TDTP LB 500427 O0 000 O0 0 1 1 1 4 68 0000000000 CCL TDTP V 500427 O0 000 O0 0 1 1 1 4 68 0000000000 GR BCS GAPI 500427 O0 000 O0 0 1 1 1 4 68 0000000000 * * DA TA * * DEPT. 6953. 000 SIGM. TDTP -999.250 TPHI. TDTP -999.250 SBHF. TDTP SBHN. TDTP -999.250 SIGC. TDTP -999.250 SIBH. TDTP -999.250 TRAT. TDTP LCO1. TDTP -999.250 SDSI. TDTP -999.250 BACK. TDTP -999.250 FBAC. TDTP TCAN. TDTP -999.250 TCAF. TDTP -999.250 TCND. TDTP -999.250 TCFD. TDTP TSCN. TDTP -999.250 TSCF. TDTP -999.250 INND. TDTP -999.250 INFD. TDTP GRCH. TDTP -999.250 TENS. TDTP -999.250 CCL. TDTP -999.250 GR.BCS DEPT. 3300. 000 SIGM. TDTP 26. 865 TPHI. TDTP 55. 370 SBHF. TDTP SBHN. TDTP 43. 414 SIGC. TDTP 1. 176 SIBH. TDTP 43. 414 TRAT. TDTP LCO1. TDTP 3. 354 SDSI. TDTP 1. 273 BACK. TDTP 117.286 FBAC. TDTP TCAN. TDTP 16798. 125 TCAF. TDTP 5001 . 344 TCND. TDTP 15694. 969 TCFD. TDTP TSCN. TDTP 3347. 750 TSCF. TDTP 998.246 INND. TDTP 1456. 969 INFD. TDTP GRCH. TDTP 28. 837 TENS. TDTP 687. 844 CCL. TDTP O. 000 GR.BCS -999.250 -999.250 -999.250 -999.250 -999.250 69.328 29.790 2.122 21.083 4236.914 250.379 58.965 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .001 SERVICE : FLIC VERSION · O01CO1 DATE · 96/08/21 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .002 SERVICE : FLIC VERSION · O01CO1 DATE · 96/08/21 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER: LIS Tape Verification Listing Schlumberger Alaska Computing Center 21-AUG-1996 17:25 PAGE: EDI TED CUR VES Depth shifted and clipped curves for each pass in separate files. PASS NUMBER: 4 DEPTH INCREMENT: O. 5000 FILE SU~ff4ARY LDWG TOOL CODE START DEPTH STOP DEPTH GRCH 5577.0 4990.0 TDTP 5610.0 4990.0 $ CURVE SHIFT DATA - PASS TO PASS (MEASURED DEPTH) BASELINE CURVE FOR SHIFTS LDWG CURVE CODE: GRCH PASS NUMBER: 1 BASELINE DEPTH .............. 88888 0 5593 5 5570 5 5559 5 5555 5 5554 5 5551 5 5546 5 5534 5 5530 5 5527 5 5507 5 5486 5 5482 5 5479 5 5475 5 5471 5 5470 5 5467 5 5466.5 5463.5 5462.5 5459.5 5455.5 5451.5 5419.5 5415.5 5411.5 5410.5 5407.5 5406.5 5403.5 5399.5 5398.5 5395.5 .......... EQUIVALENT UNSHIFTED DEPTH .......... GRCH TDTP 88886.5 88885.0 5590.5 5569.0 5553.0 5546.0 5534.0 5530.5 5486.5 5483.0 5471.0 5467.5 5463.0 5411.0 5406.5 5398.5 5559.0 5555.0 5552.0 5528.0 5504.5 5481.0 5477.5 5473.5 5470.0 5466.0 5461.5 5457.5 5453.0 5421.0 5416.5 5413.0 5408.5 5404.0 5400.0 5396.5 LIS Tape Verification Listing Schlumberger Alaska Computing Center 21-AUG-1996 17:25 PAGE: 5394 5391 5390 5387 5383 5379 5375 5374 5371 5370 5367 5 5363 5 5358 5 5355 5 5354 5 5351 5 5339 5 5338 5 5335 5 5334 5 5331.5 5330.5 5327.5 5326.5 5323.5 5314.5 5300.5 5299.5 5295.5 5289.5 5284.0 5283.5 5279.5 5275.5 5271.5 5267.5 5251.5 5251.0 5247.5 5243.5 5239.5 5236.0 5227.5 5223.5 5219.5 5215.0 5199.5 5198.5 5195.5 5191.5 5187.5 5183.5 5180.5 5179.5 5175.5 .5 5395.0 .5 5392.0 .5 5390.5 5 5388.5 5 5384.5 5 5381.0 5 5377.0 5 5374.5 5 53 73.5 5 5371.0 5359.0 5354.5 5338.5 5334.0 5330.0 5325.5 5313.5 5296.0 5285.0 5278.0 5245.5 5231.0 5209.0 5195.0 5177.0 5370.0 5365.5 5357.5 5352.5 5340.5 5337.0 5333.5 5329.0 5324.5 5300.5 5297.0 5285.0 5282.0 5277.5 5273.5 5269.0 5253.0 5249.5 5245.5 5241.0 5229.0 5224.5 5221.0 5201.0 5196.5 5192.5 5188.0 5184.5 5180.0 5176.5 LIS Tape Verification Listing Schlumberger Alaska Computing Center 21-AUG-1996 17:25 PAGE: 10 5171.5 5166.0 5155.5 5155 0 5147 5 5143 5 5139 5 5129 5 5123 5 5122 0 5119 5 5102 5 5099 5 5095 5 5094 5 5091 5 5090.5 5086.5 5082.5 5071.5 5067.5 5063.5 5059.5 5059.0 5055.5 5049.5 5043.5 5039.5 5038.0 5035.5 5031.5 5027.5 5023.5 5019.5 5009.5 100.0 $ 5172.5 5165.0 5157.0 5153.5 5149.0 5145.5 5141.0 5126.0 5125.0 5120.5 5120.5 5103.0 5100.5 5096.0 5095.0 5092.5 5091.5 5087.0 5083.5 5072.5 5068.0 5065.0 5060.0 5057.5 5056.5 5050.5 5044.5 5041.0 5038.0 5036.5 5032.0 5027.5 5023.5 5020.5 5011.0 101.5 101.0 REMARKS: This file contains Borax Pass #3 of the TDTP. The depth adjustments shown above reflect Borax Pass #3 GRCH to Base Pass #1 GRCH and Borax Pass #3 SIGMA to Base Pass #1 SIGMA. All other TDTP curves were carried with the SIGMA shifts. LIS FORMAT DATA LIS Tape Verification Listing Schlumberger Alaska Computing Center 21-AUG-1996 17:25 PAGE: 11 ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 92 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 11 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERVUNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 500427 O0 000 O0 0 2 1 1 4 68 0000000000 SIGM TDTP CU 500427 O0 000 O0 0 2 1 1 4 68 0000000000 TPHI TDTP PU-S 500427 O0 000 O0 0 2 1 1 4 68 0000000000 SBHF TDTP CU 500427 O0 000 O0 0 2 1 1 4 68 0000000000 SBHN TDTP CU 500427 O0 000 O0 0 2 1 1 4 68 0000000000 SIGC TDTP CU 500427 O0 000 O0 0 2 1 1 4 68 0000000000 SIBH TDTP CU 500427 O0 000 O0 0 2 1 1 4 68 0000000000 TRAT TDTP 500427 O0 000 O0 0 2 1 1 4 68 0000000000 LCO1 TDTP 500427 O0 000 O0 0 2 1 1 4 68 0000000000 SDSI TDTP CU 500427 O0 000 O0 0 2 1 1 4 68 0000000000 BACK TDTP CPS 500427 O0 000 O0 0 2 1 1 4 68 0000000000 FBAC TDTP CPS 500427 O0 000 O0 0 2 1 1 4 68 0000000000 TCAN TDTP CPS 500427 O0 000 O0 0 2 1 1 4 68 0000000000 TCAF TDTP CPS 500427 O0 000 O0 0 2 1 1 4 68 0000000000 TCND TDTP CPS 500427 O0 000 O0 0 2 1 1 4 68 0000000000 TCFD TDTP CPS 500427 O0 000 O0 0 2 1 1 4 68 0000000000 TSCN TDTP CPS 500427 O0 000 O0 0 2 1 1 4 68 0000000000 TSCF TDTP CPS 500427 O0 000 O0 0 2 1 1 4 68 0000000000 INND TDTP CPS 500427 O0 000 O0 0 2 1 1 4 68 0000000000 INFD TDTP CPS 500427 O0 000 O0 0 2 1 1 4 68 0000000000 GRCH TDTP GAPI 500427 O0 000 O0 0 2 1 1 4 68 0000000000 TENS TDTP LB 500427 O0 000 O0 0 2 1 1 4 68 0000000000 CCL TDTP V 500427 O0 000 O0 0 2 1 1 4 68 0000000000 LIS Tape Verification Listing Schlumberger Alaska Computing Center 21-AUG-1996 17:25 PAGE: 12 ** DATA ** DEPT. 5607. 500 SIGM. TDTP 26. 505 TPHI. TDTP SBHN. TDTP 52. 709 SIGC. TDTP 5. 270 SIBH. TDTP LCO1. TDTP 3. 508 SDSI. TDTP 1. 314 BACK. TDTP TCAN. TDTP 33943 . 453 TCAF. TDTP 9601 . 496 TCND. TDTP TSCN. TDTP 3728. 872 TSCF. TDTP 1062. 948 INND. TDTP GRCH. TDTP -999. 250 TENS. TDTP 945. 000 CCL. TDTP DEPT. 4990. 500 SIGM. TDTP SBHN. TDTP -999. 250 SIGC. TDTP LCO1 . TDTP - 999. 250 SDSI. TDTP TCAN. TDTP -999. 250 TCAF. TDTP TSCN. TDTP -999. 250 TSCF. TDTP GRCH. TDTP 25.125 TENS. TDTP -999. 250 TPHI. TDTP -999. 250 SIBH. TDTP -999. 250 BACK. TDTP -999. 250 TCND. TDTP -999. 250 INND. TDTP -999. 250 CCL. TDTP 62. 439 SBHF. TDTP 54. 008 TRAT. TDTP 91 . 307 FBAC. TDTP 17846.172 TCFD. TDTP 1343. 898 INFD. TDTP O. 000 -999 250 -999 250 -999 250 -999 250 -999 250 -999 250 SBHF. TDTP TRAT. TDTP FBAC. TDTP TCFD. TDTP INFD. TDTP 49.474 2.167 20.497 4720.354 280.328 -999.250 -999.250 -999.250 -999.250 -999.250 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .002 SERVICE · FLIC VERSION : O01CO1 DATE : 96/08/21 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .003 SERVICE : FLIC VERSION : O01CO1 DATE : 96/08/21 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILENUMBER: 3 EDITED CURVES Depth shifted and clipped curves for each pass in separate files. PASS NUMBER: 5 DEPTH INCREMENT: 0.5000 FILE SU2v~N~RY LDWG TOOL CODE START DEPTH GRCH 5596.0 TDTP 5620.0 STOP DEPTH .......... 4990.0 4990.0 LIS Tape Verification Listing Schlumberger Alaska Computing Center 21-AUG-1996 17:25 PAGE: 13 $ CURVE SHIFT DATA - PASS TO PASS (MEASURED DEPTH) BASELINE CURVE FOR SHIFTS LDWG CURVE CODE: GRCH PASS NUMBER: 1 BASELINE DEPTH 88888.0 5570.5 5526.5 5522 5 5518 5 5514 5 5510 5 5506 5 5502 5 5498 5 5494 5 5492 5 5482 5 5478 5 5475 5 5472 0 5467 5 5467.0 5463.5 5459.5 5455.5 5451.5 5447.5 5445.0 5443.5 5442.5 5439.5 5438.5 5435.5 5435.0 5422.5 5419.5 5415.5 5411.5 5410.5 5407.5 5406.5 5403.5 5399.5 5398.5 5395.5 5394.5 5390.5 5386.5 5382.5 .......... EQUIVALENT UNSHIFTED DEPTH GRCH TDTP .............. 88888.0 88888.5 5570.5 5526.5 5522.0 5518.0 5514.5 5510.5 5506.0 5501.5 5497.5 5494.0 5482.0 5478.5 5472.5 5466.0 5446.0 5442.5 5437.5 5435.0 5423.0 5410.5 5406.0 5402.0 5398.5 5395.0 5390.5 5385.5 5382.0 5493.0 5477.5 5469.5 5466.0 5461.5 5457.5 5453.0 5448.5 5445.0 5440.5 5436.5 5419.5 5415.0 5411.5 5407.0 5399.0 5395.5 LIS Tape Verification Listing Schlumberger Alaska Computing Center 21-AUG-1996 17:25 PAGE: 14 5379.5 5379.0 5375.5 5373.5 5371.5 5368.0 5365.5 5363.5 5359.5 5355.5 5354.5 5351.5 5350.5 5347.5 5346.5 5342 5 5334 5 5331 5 5330 5 5327 5 5326 5 5323 5 5322 5 5319 5 5318 5 5315 0 5302 5 5301.0 5299.5 5295.5 5289.0 5283.5 5279.5 5275.5 5271.5 5267.5 5260.5 5259.5 5255.5 5251.5 5249.5 5247.5 5243.5 5239.5 5235.5 5223.5 5219.5 5216.0 5215.5 5211.5 5207.5 5203.5 5199.5 5195.5 5187.5 5379.0 5372.0 5367.5 5366.0 5354.5 5351.0 5347.0 5342.5 5334.5 5330.0 5325.5 5321.0 5317.5 5312.0 5297.5 5295.5 5284.0 5253.5 5243.5 5209.5 5381.0 5376.5 5373.0 5365.0 5360.5 5356.5 5352.0 5348.5 5332.5 5330.0 5324.5 5320.0 5300.0 5296.5 5284.5 5281.0 5276.0 5272.5 5267.0 5259.0 5254.0 5251.5 5247.5 5244.0 5239.5 5237.5 5225.5 5221.0 5216.0 5212.5 5209.0 5205.0 5200.5 5197.0 5188.0 LIS Tape Verification Listing Schlumberger Alaska Computing Center 21-AUG-1996 17:25 PAGE: 15 5179.5 5175.5 5171.5 5160.0 5154.0 5151 5 5147 5 5133 0 5127 5 5123 5 5115 5 5111 5 5103 5 5099 5 5095 5 5095 0 5093 5 5091 5 5090 5 5083 5 5079 5 5075.5 5071.5 5067.5 5067.0 5062.5 5058.5 5055.5 5054.5 5051.5 5050.5 5038.0 5035.5 5031.5 5029.5 5027.5 5023.5 5019.5 5007.5 4995.5 100.0 $ 5157.0 5153.0 5130.0 5124.0 5094.5 5092.0 5091.0 5067.0 5063.5 5059.0 5055.0 5051.5 5037.5 5030.5 5009.0 4994.5 99.0 5180.0 5175.5 5171.5 5152.5 5149.0 5129.0 5124.0 5116.0 5111.5 5103.5 5100.0 5095.5 5092.0 5084.0 5079.5 5076.0 5073.0 5068.5 5056.5 5052.0 5036.0 5032.5 5027.5 5024.0 5019.5 100.0 REMARKS: This file contains Borax Pass #4 of the TDTP. The depth adjustments shown above reflect Borax Pass #4 GRCH to Base Pass #1 GRCH and Borax Pass #4 SIGMA to Base Pass #1 SIGMA. All other TDTP curves were carried with the SIGMA shifts. $ LIS FORMAT DATA LIS Tape Verification Listing Schlumberger Alaska Computing Center 21-AUG-1996 17:25 PAGE: 16 * * DATA FORMAT SPECIFICATION RECORD * * ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 92 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 11 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERVUNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 500427 O0 000 O0 0 3 1 1 4 68 0000000000 SIGM TDTP CU 500427 O0 000 O0 0 3 1 1 4 68 0000000000 TPHI TDTP PU-S 500427 O0 000 O0 0 3 1 1 4 68 0000000000 SBHF TDTP CU 500427 O0 000 O0 0 3 1 1 4 68 0000000000 SBHN TDTP CU 500427 O0 000 O0 0 3 1 1 4 68 0000000000 SIGC TDTP CU 500427 O0 000 O0 0 3 1 1 4 68 0000000000 SIBH TDTP CU 500427 O0 000 O0 0 3 1 1 4 68 0000000000 TRAT TDTP 500427 O0 000 O0 0 3 1 1 4 68 0000000000 LCO1 TDTP 500427 O0 000 O0 0 3 1 1 4 68 0000000000 SDSI TDTP CU 500427 O0 000 O0 0 3 1 1 4 68 0000000000 BACK TDTP CPS 500427 O0 000 O0 0 3 1 1 4 68 0000000000 FBAC TDTP CPS 500427 O0 000 O0 0 3 1 1 4 68 0000000000 TCAN TDTP CPS 500427 O0 000 O0 0 3 1 1 4 68 0000000000 TCAF TDTP CPS 500427 O0 000 O0 0 3 1 1 4 68 0000000000 TCND TDTP CPS 500427 O0 000 O0 0 3 1 1 4 68 0000000000 TCFD TDTP CPS 500427 O0 000 O0 0 3 1 1 4 68 0000000000 TSCN TDTP CPS 500427 O0 000 O0 0 3 1 1 4 68 0000000000 TSCF TDTP CPS 500427 O0 000 O0 0 3 1 1 4 68 0000000000 INND TDTP CPS 500427 O0 000 O0 0 3 1 1 4 68 0000000000 INFD TDTP CPS 500427 O0 000 O0 0 3 1 1 4 68 0000000000 GRCH TDTP GAPI 500427 O0 000 O0 0 3 1 1 4 68 0000000000 TENS TDTP LB 500427 O0 000 O0 0 3 1 1 4 68 0000000000 CCL TDTP V 500427 O0 000 O0 0 3 1 1 4 68 0000000000 LIS Tape Verification Listing Schlumberger Alaska Computing Center 21-AUG-1996 17:25 PAGE: 17 * * DA TA * * DEPT. 5620. 500 SIGM. TDTP SBHN. TDTP 127. 284 SIGC. TDTP LCO1. TDTP O. 887 SDSI. TDTP TCAN. TDTP 86.174 TCAF. TDTP TSCN. TDTP 17. 676 TSCF. TDTP GRCH. TDTP - 999. 250 TENS. TDTP DEPT. 4989. 000 SIGM. TDTP SBHN. TDTP -999. 250 SIGC. TDTP LCO1 . TDTP -999. 250 SDSI. TDTP TCAN. TDTP -999. 250 TCAF. TDTP TSCN. TDTP - 999. 250 TSCF. TDTP GRCH. TDTP 27. 922 TENS. TDTP 25. 825 TPHI. TDTP O. 000 SIBH. TDTP O. 857 BACK. TDTP 97.161 TCND. TDTP 19. 929 INlVD. TDTP 970. 000 CCL. TDTP -999. 250 TPHI. TDTP -999. 250 SIBH. TDTP -999. 250 BACK. TDTP -999. 250 TCND. TDTP -999. 250 INND. TDTP -999. 250 CCL. TDTP O. 000 SBHF. TDTP 148. 228 TRAT. TDTP 123. 249 FBAC. TDTP 2889. 375 TCFD . TDTP 1479. 964 INFD. TDTP 0.000 - 999.250 SBHF. TDTP -999. 250 TRAT. TDTP -999. 250 FBAC. TDTP -999. 250 TCFD. TDTP - 999.250 INFD. TDTP -999.250 121. 023 O. 322 44.311 696. 113 317. 657 -999.250 -999.250 -999.250 -999.250 -999.250 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .003 SERVICE · FLIC VERSION : O01CO1 DATE : 96/08/21 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .004 SERVICE : FLIC VERSION : O01CO1 DATE : 96/08/21 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NIIMBER: 4 AVERAGED CURVES Pulsed Neutron: Unaveraged edited Pass 1 Gamma Ray and backround counts; arithmetic average of edited static baseline passes for all other curves. DEPTH INCREMENT O. 5000 PASSES INCLUDED IN AVERAGE LDWG TOOL CODE PASS NUMBERS TDTP 1 LIS Tape Verification Listing Schlumberger Alaska Computing Center 21-AUG-1996 17:25 PAGE: 18 REMARKS: The average pass is equal to pass 1. $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** * * SET TYPE - 64EB * * .............................. TYPE REPR CODE VALUE .............................. 1 66 0 2 66 0 3 73 80 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 12 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NOWB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 500427 O0 000 O0 0 4 1 1 4 68 0000000000 SIGM PNAV CU 500427 O0 000 O0 0 4 1 1 4 68 0000000000 TPHI PNAV PU-S 500427 O0 000 O0 0 4 1 1 4 68 0000000000 SBHF PNAV CU 500427 O0 000 O0 0 4 1 1 4 68 0000000000 SBHN PNAV CU 500427 O0 000 O0 0 4 1 1 4 68 0000000000 SIGC PNAV CU 500427 O0 000 O0 0 4 1 1 4 68 0000000000 SIBH PNAV CU 500427 O0 000 O0 0 4 1 1 4 68 0000000000 TRAT PNAV 500427 O0 000 O0 0 4 1 1 4 68 0000000000 SDSI PNAV CU 500427 O0 000 O0 0 4 1 1 4 68 0000000000 BACK TDTP CPS 500427 O0 000 O0 0 4 1 1 4 68 0000000000 FBAC TDTP CPS 500427 O0 000 O0 0 4 1 1 4 68 0000000000 TCAN PNAV CPS 500427 O0 000 O0 0 4 1 1 4 68 0000000000 TCAF PNAV CPS 500427 O0 000 O0 0 4 1 1 4 68 0000000000 TCND PNAV CPS 500427 O0 000 O0 0 4 1 1 4 68 0000000000 TCFD PNAV CPS 500427 O0 000 O0 0 4 1 1 4 68 0000000000 TSCN PNAV CPS 500427 O0 000 O0 0 4 1 1 4 68 0000000000 TSCF PNAV CPS 500427 O0 000 O0 0 4 1 1 4 68 0000000000 INND PNAV CPS 500427 O0 000 O0 0 4 1 1 4 68 0000000000 LIS Tape Verification Listing Schlumberger Alaska Computing Center 21-AUG-1996 17:25 PAGE: 19 NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) INFD PNAV CPS 500427 O0 000 O0 0 4 1 1 4 68 0000000000 LCO1 PNAV 500427 O0 000 O0 0 4 1 1 4 68 0000000000 * * DA TA * * DEPT. 5622.000 SIGM. PNAV 22.974 TPHI.PNAV 45.101 SBHF. PNAV SBHN. PNAV 40.855 SIGC. PNAV 2.984 SIBH. PNAV 40.855 TRAT. PNAV SDSI. PNAV 1. 075 BACK. TDTP 54. 364 FBAC. TDTP 26. 493 TCAN. PNAV TCAF. PNAV 8382. 471 TCND.PNAV 21360. 887 TCFD.PNAV 6034. 744 TSCN. PNAV TSCF. PNAV 1465.754 INND. PNAV 1957.878 INFD.PNAV 321.040 LCO1.PNAV DEPT. 3300.000 SIGM. PNAV 26.865 TPHI.PNAV 55.370 SBHF. PNAV SBHN. PNAV 43.414 SIGC. PNAV 1.176 SIBH. PNAV 43.414 TRAT. PNAV SDSI.PNAV 1.273 BACK. TDTP 117.286 FBAC. TDTP 21.083 TCAN. PNAV TCAF. PNAV 5001.344 TCND.PNAV 15694.969 TCFD.PNAV 4236.914 TSCN. PNAV TSCF. PNAV 998.246 INND.PNAV 1456.969 INFD. PNAV 250.379 LCO1.PNAV 29.272 2. 002 26539. 676 4640. 712 3.166 29.790 2.122 16798.125 3347.750 3.354 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .004 SERVICE : FLIC VERSION : O01CO1 DATE : 96/08/21 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** TAPE TRAILER **** SERVICE NAME : EDIT DATE · 96/08/21 ORIGIN : FLIC TAPE NAME · 96188 CONTINUATION # : 1 PREVIOUS TAPE : COGENT : ARCO ALASKA INC, D.S. 4-19, PRUDHOE BAY, 50-029-21791-00 LIS Tape Verification Listing Schlumberger Alaska Computing Center 21-AUG-1996 17:25 PAGE: 20 **** REEL TRAILER **** SERVICE NAME : EDIT DATE : 96/08/21 ORIGIN : FLIC REEL NAME : 96188 CONTINUATION # : PREVIOUS REEL : CO~k~ENT : ARCO ALASKA INC, D.S. 4-19, PRUDHOE BAY, 50-029-21791-00 LIBRARY TAPE CURVE SPECIFICATIONS Company, Well Field County, State ECC~ 3324 Date 4/6/88 DELIVERY DATE 5/20/88 Curve Name (Abbrev.) Standard Curve Name Logs Used Scale FILES 1 & 2 ' , CILD Mill imho s/meter DIFL-AC ' SP Millivolts ,, ,,, GR API for radiation deflectio~ " TEMP, , t~ahrenhe"~'t ...... "JI CHT Pound force -- " AC Microsecond per foot - RFOC Ohmmeter ,, RILM Ohmmeter ,, RILD Dhmmeter " ' ' , ,, REEL NaME : CRIGiN : FSYS SERVICE NAME: 5ITLIS REEL CCNTINU~TICk NUMBER: FREVICUS REEL NA~E : COMMENTS: DRESSE~ ATLAS LENGTh: 132 BYTES 01 LIS ** TAPE HEADER ** TAPE NAME : OATE : ORIGIN : FSYS SERVICE NAM:: MAIN TAPE CONTINU~T!O~ PREVICUS TAPE NAPE COMMENTS: LENGTh: 1~2 3YTES NUMSER: : 01 CUSTCMER T~PE --- CPmATE~ BY SDS PROGRAM 2.0 ** FILE HEADER ~ 1 ** FILE NAME: MAIN .001 SERVICE NAME: VERSION ~ : 1 CATE: 85/11/2C MAX RECO~C LENGTh: 1C2~ FILE TYO:: LC mREVIOUS ;ILE N~E: :,* INF-CR~TICN RECDRCS ** ~YTES MNE? CONTENTS APIN : 5002921791 CN : A~CC ~L~SK4, WN : OS ~-19 FN : P~UCkOE BAY 5OUN : NORTH SLOPE STAT : ~L~SKa LCC : 150.00 INC, ** FORMAT ** UNITS F-NTRY E. LOCKS TYPE ;NTRY CESCRImTION ~ 1 CEPTHS OECREASE 8 6~ 0 FRAME SFAC-Nc ~ .lIN FR~E S~ACING UNITS 11 1~ NAX!MUM FRAMES/RECGR~ 0 TERMINATOR -C.5~ LEVEL SmACING D6TUM SPECIFiCATiCN BLOCKS CURVE R:PR NAME CCDE SIZE SAMmLE bNITS i!il iii! CURV= NAM:- REPR CCC:. ~liI SANPLE UNITS GR 68 4 1 CAL 68 4 I IN TT:N 68 4 1 LBF ACO 68 4 1 DIM RFOC 68 4 1 OHMM RILD 68 4 1 CHUM ** FORMAT ** ENTRY BLOCKS TYPE ENTRY OESCRiPTION 4 1 CEPTHS CECRE~SE 3 6C,0 FRAME SmACING 9 .lIN FRAFE SPACING UNITS 11 18 ~HXIMUM ~R~MES/RECO~C 0 TERmINaTOR -O,5GO LEVEL SP~CING D~TUM SPeCIFICaTION BLOCKS CURVE R;PR NAME CODE SIZE SAMPL~ LNiTS ImII Immi CILO 68 4 I ~HC GR 68 4 1 ~P! CAL 68 4 I IN TTEN 68 4 I LB~ AC~' 68 ~ 1 CiM R~CC 68 4 I Ch~ RILD 68 4 1 CHM~ ** CAT~ ** DEPTH 7015.C~0 FT 2138.176C CILD 365.751 SP 3.416 CAL 12.401 C~'T -11..¢"0,.; .000 AC~ O.CO0 ~C 48.9'21 RZLO DEPTH 7COO.CCC FT 2133.604C M CILD 365.576 SP ~.052 CAL 12.401 CHT -115C0.££G ~CQ O.CO0 AC ~8.901 RiLO 2,7~5 CEPTH 6gOO.COO FT 2103.t24C M CILD 488.518 SP CAL 12.398 CMT -115CC.CC3 ACO 0.C£0 AC 94.873 RILD 2.C47 CEPTH 68GO.COO FT Z072.544C M CILO 480.731 SP -42.609 C4L 12.106 C~T -115C0.CC0 4C,~ O.CCO AC g3.3~7 RILG 2.C~0 8EPTH 67C0.CC0 FT 2C42.164C M · CURVE ~EPR N&ME CCCE SiZE S~ 68 4 TE~ ~8 4 C~T 5 8 4 S P ~ 6 ,$ 4 ~ r x ~ 4 RILM ~ 4 GR TTEN RFOC TTEN R:O" GR TTEN RFOC GR TTEN R:CC 77.~33 2195.7al 2.551 77,~3 3297.776 2.6C7 ~1.493 ~115 42¢ 2.327 46.261 31C5.125 S~PLE 1 1 1 1 1 1 TEMm SmD RIL~ TSMm S~D ~TLN T~MP ~ILF TSMP RILN UNITS MV EEGF L~F F/MN U$/F OhMM C.O00 22.998 2.406 0 nnO 26,2.o3 2.407 C.GOO 2.169 i'~ 25.027 2.150 CILD' 502.017 SP -30.3~0 CAL 12.C9'~ CMT -115C0.C00 ~C~ 0.000 ~C 8~ .238 RILD 1,992 GR TTEN RFOC 6i,246 , m 3u~ 372 2.92~ T EMP SPO RiLF, e. O00 38.190 2.111 O~TH 6600.CC0 FT 2011.684C M CILO 422.360 SP CAL 12.164 C~T -115C0.C00 ACQ O.CCO AC 93.795 RILD 2.368 GR TTEN qFOC 51.675 3o66.6a8 3.63C TEMP SPD RILN C.COC 34.559 2.490 DDPT~ 65CO.CGO FT 1951.204C M mmmmmmmmmmmmmmmmmmmmmmmmmmmmm-- CILD 676.607 SP -66.536 C~L 11.9~1 C~T -11500.CeG ~CG O.COO ~C g1.761 RILO 1.478 GR TT:N. ~FOC 44.43: 29~C.27~ 5.0C1 TEHF 35.070 1.718 DEPTH 64G0.C00 FT CILO 810.817 CAL 12.134 .~CQ O.OOO RILO 1.233 S? -75.3a6 CPT AC 9~ .741 GR TTEN RFCC 2954.844 4.65C TEMF SPD RILM DEPTH ~OO~. . ¢30~, FT mm____mm--mmm--mmmmmm CILg 588.144 C~L 12.~57 ~CQ O.CCO RZLD 1,700 1920.244C M S: -~0.077 rpT -11~CO nog ~C 94.99~ TTDN RFOC 2933.84C TE~P SPD PlLN 34.996 2.077 ~EPTH 62'"0.660 ;T 18S9.764C 1,1 CILD 530.888 S= -53.B8~ C~L 12.152 CWT -115C3.CC0 ~CQ C.CCO ~C g~.Clg RiLO 1,85~ GR TT~N R~OC 52 .Cd2 2~9 ~ 81 7 4,152 TEMF RILl',! 0.000 35.050 2.304 DE,TM 61C0.CC0 CILD 560.793 C6L 12.2~b ACQ 0· ,,, ,., r' F" CJ RILD 1.783 FT 185,~. 2:-_'.z,C v, SP -30.C20 CwT -11:CO,CCJ 1 ~'~ ~.245 GR TTEN ~FOC 51.3C7 ~4C. ~.821 T EMF SPD RT C.O00 25.,589 I .927 SEmTW 6COO,CCO ~T 1,~2C.~0cC M CILD 458.165 S? -46.66~ CAL 12.118 CHT -II'Ce. COO ~CQ O.CCO AC 94.822 RILD 2.183 OR TTEN RFOC =2,327 18C8.6a4 4.314 TEMP SPO R~L~ "" 29.509 2 53= CEPTH 5900.C0C FT 17c$,324C M CIL9 335.937 SP -16.320 C~L 12.395 CHT -115CC.CCO ~CQ O.CCO AC 95.953 RILD 2.977 GR TTEN ~FOC 62,125 28Cg,964 ~ 04~ TEMP SPD RILM C.¢OC 4~ 7~4 3.297 CEPTH 5~CO.CCC FT 1767,..~&4C M CILD 459.153 S~ -3~.359 C~L 12.966 CMT -11500.CC0 GR 4~.252 TEMP TTEN 2774.~4d SPD · . ., . . · C.DO0 19.'~98 ~,~ u .uuu RIL8 2.178 AL, C C R DEPTH 5700,C00 FT 1737.364[ M CiLD 346.?08 SF -15.223 CAL 12.687 CHT -115C0.CC0 ~CQ 0.000 AC 1C4.251 RILD 2.884 OEPTH 5600,CCC FT 1786,~84C M ILD 265.5§8 SP -12.966 ~L 13.C98 C~T -115CC.8C0 C~ 0.000 AC 102.619 ZLD 3.765 CEPTH 5500.C00 FT 1~76.4C3C M CZLD 582.C63 Sp -42.803 CAL 12.499 CHT -115C~.£C0 ~SQ O.CCO ~C 11C.15~ RILD 1.718 DE~TH 5400,CC0 FT 1645,923C M CiLD 2~9.971 S~ -21 .611 CAL 13.16~ CHT -11¢~C, . r,~ ACQ O.CCO AC 101,503 ~ILD 3,33~ C=_PTb 53CO,CCO FT 1615.4/.zC M CILD 622.273 .S; -33.~45 r~L~ 12 ,_.~"~ C~T -115CC, ~C~ C.CCO ~,C 107.2~0 elLS 1.637 05PTH 52CC.CCS FT 15~4.~63C M DEPTH, 51~''''.,,,..,.CCc FT 1554 CiL3 6~6,7~1 SP -5'9,79~ C&L 12,2~ C~t -11~CC.CCO ~C~ C.CC,S ~C 11~.C'19 RILO 1.595 DEPTH 5COO.CCC :T 1524.C03C N CILD 598.36C SP -54.~71 C~L 12.793 C~T -11500.CCC ~CQ O,CO0 ~C 12~.326 RILD 1 ,571 DEPTH 49GO.CCC FT 1403.523C M CZLD 235.324 SF -13.116 CAL 13.210 CHT -115~0.C00 AC~ O.CC0 ~C 9~.277 RILD 4.249 GR TT~_N RFOC GR TT=_N RFOC GR TTEN Rr-0C TTEN TTEN R:OC GR TTEN RFOC TT~ ;F,3C GR TTEN RFOC GR TTEN R~OC 57.140 2719,4al 4.434 41.841 2726.1d6 - 3.312 55.47C 26E1.254 3.6C1 85.832 2648.827 3.537 .~1,51~ 2617.1CC 32.51C ,c61 '- · , 35.99? 34.9C7 2513.029 4.767 244C.135 4.742 TEMP SPD RILM TEMP SPD RILN TEMP SPD RIL~ TEqP SPD TEMP SPD RILM TE~F RiLF TEHP TEMP SPD RIL~ TEMF SPD RILF /'. DYD 0,000 2t .998 2,858 C.OOO 21.301 C.O00 23.7~3 !.Q63 C.080 30.736 3.5~7 32.203 1,~10 22.792 1.~72 C.0OO 2.C37 C.OOO 25.638 2.156 O,O00 29.173 4.C45 CILC CAL RILD 243.364 59 -14.042 12.434 CPT -115C0.C0C O.CO0 AC 122.C'~2 4.109 GR TTEN RFOC 71.682 2421 .131 3,913 '" E M P, SPO RiLN DEPTH 4700.CCC FT 1432.5~3C M I II Il i I i i ! ,ii i I ii, i I ! I i i! CILD 237.657 SP -30.C1~ CAL 12.C38 CHT -115C$.CC0 ~C,~ O.CCC, AC 1C4.2C4 RILO 3.476 GR TTEN RFOC ~399 ~4C 6.71C TEMP SPD PILF 27.301 3.9~3 DEPTH 4500.C$0 FT 140~.083C N ClL~ $~7 ~c~ SP -14 c~7 ~ -'~ · , I,~ C~L 13.145 C~T -11~e. CCC ~C~.~ O. ~,30 ~C 1t7. 207, RILD =T=N R=CC 2~44.~e, 2 4.294 TEM; nTL~ .cOO 27.270 4.431 CILD 434.~95 C&L 10.734 FT 1371.e03C M Sm -49.518 CHT -11~CO.CGO ~C 112.~29 GR TTEN 43.772_ 234C -- ,.. .~51 TEMF' SPD RZL/~ C.COC 37.070 DEPTH 44C0.6CC FT 1341.1230 CiLD 291 .712 Sm -1,~.891 C4L 13.366 CbT -115C0.CC0 ~CQ O.CO0 AC 122.3/-4 ~.ILO 3.428 TTEN R=CC 75.315 2S14.39C 3, ~.'~ ,~: TEMF RILF 42,126 3.310 IilI CILD C&L RILO 43CC..CCC FT 1310.643C M 232.948 SP -29.348 12.3C8 C~T -115CC.CC0 O.CO0 4C 110.210 4.203 ~R TT~N RFOC 61 .43'~ 2262.476 5 .'~8',~ TEMP RILM C.SO0 43.304 4.g49 DEPTH CIL2 C4L ~C~ RILO C2OO.CCC FT 1280.163C M 2~2 ,=46 SP -°7 =71 12.238 CMT -115CC.C00 O.C~O ~C 115.5~5 4.295 GR TTEN PFOC 64.418 2253.131 6.081 TEMg ~iLM O.t~~ 4.885 O-_-mTM 41Ce. CCC FT 1249.6~3C y, CiLD 268.663 S~ '42.319 CAL 12.26~ CHT ~CQ O.CO0 AC 113.12~ RILD 3.722 TT~N ~FOC 22C7.744 5.676 T~MP SPO RILK C.CO0 29.92~ 4.6~0 OEPTH 4COC.CCO FT 1219.2C'2C M CILO 217.796 SP -17.488 CAL 1 3. 366 CHT -115CO, CCC ACQ O.CO0 AC 11~. 5/.,,6 RILD 4.591 TTEN RFOC 76.2C~ 218~.742 4.54C TEMP SPD RiL~ C.OOC 44 4.262 OEPTH 39C0.CC0 FT 1188.722C M CILD 312.8C2 SP -48.412 GR 55.654 TEMP ~C~' O.C~0 ~C 115.~71 RILO 3.197 RFCC _/IQ~'.O'IA 5.545 ~u R!LN 3.907 DEPTH 3800.CG0 FT 115~-.242C M CILD 315.C24 SP -17.703 C~L 12.501 CHT -11~C'O.CCO ~C~ O.CO0 AC ~ILO 3.174 GR TTEN ~4.525 ~C.3C? 4.19a RILN C 44.699 3.cpo OEPTH 3700.CC0 ~T 1127.762C M ¢ILO 412.9m8 SP -14.354 CAL 12.301 CHT -11500.CC0 ACQ O.CCO aC 133.~26 RILO 2.422 GR TTEN R~OC ~5.777 3.442 TEMP SPD RILM C.COC 44.7c6 2.7~ ~EPT~ 350C.CC0 FT 1097.252C M CILD ~77.949 S; -23.875 CAL 12.580 CHT -11SOO.CCC ~ILO 2.C92 TTEN RFOC 57.495 ~1 4 58~ ~ 4~ TEMP SPD ~-:LM O.O00 45.1Ol DSPTH 3500.CC0 FT 106~.802C M CILO 634.449 SF -25.~9 CAL 14.413 C~T -11~r'C,~ . ~C~, C,.CC3 ;~C 121 RILO 1.576 TT:N :=SC 51 .519 lO76.778 2 .ase TEMP P, ILF~ C,O00 44.78a 1.788 ,..,3. EPTP 34C0.C'~',~.~ FT 1C, 3~.,.3l$C,_ r",, CIL3 Z7~.14~ $: -~2.2c; C&L 15.~5~ C~T -1153S.C~ AC~ O.C?,J ;S 113.1C~ RiLO TTSL 3C .27C 197t TSMP SPD C'. 030 .=0.153 = 4~9 ~'EFTm 3~Cr~.:..'.~''''C FT 1''~n:_...54iL' ¢',~ TT:N 1::: = 0 C, 5S .065 1;1~.674 2.7 ,c'1 SP0 RZLM 30.311 ZEPTP 32,3~.CC0 FT 975.3~Zl M CILD 77~.~79 S: -46.49f. C~L ~4.921 CrT -115CC.CC~ ACO 0.CC0 AC 127.454 RiLO 1.2c5 ~R TTEN q F r',C l~r 2.2=~_ _. 4 4~ TE,M~ RILF C.OO0 2~.4S1 1.770 EEPTh 3100.CCC FT ¢4~.~818 M CILO 731 ~9 SP -4~ ~ C~L 15.477 C~T -11='~O.~O'J, ,-, AC~ O.CCO ~C 139.325 RILD 1.366 ,S R TT=N RFOC 35.345 1858.27C 3.437 TEM~ SPD RILM C.030 37.g76 1.950 O£PTH 3COO.CCC FT g14.4C, 19 M CILD 538.178 SP -4~.~,~2 CAL 15· 5~2~ u¢~T -11~''r._~.~ ~CQ O.CC9 AC 129.L~ RILD 1.~5~ TTEN ~F~C .. ~ 42.2~7 1E~4.755 3.~P4 TEMP SPD RiLM C.O0~ 1E.221 2.371 'O=PTH' 2900.£C0 mT 883.9219 M 7 CiLD 14.541 SP 27.325 CAL 12.521 DPT -115CC.CC0 ~C~ 0.C60 AC 64.275 RILD ~8.770 DEPTH 2.~87.5CC FT 880.111~ M CILO 14.541 SP 27.325 C&L t2.503 OFT -11500.CC0 ~C~ O.CeO kC ~4.275 RILD 66.770 GR TTEN RFGC GR TTEN STARTING DEPTP : 7015.000 FT 2135.1760 M ENDING 3EPTH : 2887.500 FT ~80.!11.~ N ** FiLE TRAIL~P *~ FiLE N~ME: M~ZN .001 SERVICE NAME: VERSION ~ : 1 D~TE: ~5/11/ MAXIMUM LENGTh: 1,324 FILE TYP:: LC NEXT FILE N~YE: FILE NAME: REPT .002 SERVICE NAME: VERSION ~ : 1 DATE: 8~/11/2C M~X RESOR~ LENGTh: FILE TYPE: LC PREVIOUS FILE N~FE: 1C 2,.,, ** IN=ORF4TICN RECORDS ** £YTES MNEM CONTENTS ~PIN : 5002921791 CN : ARCC ALaSKa1, WN : O'S 4-19 FN : PRUDriCF. BAY COUN : NORTP, SLOPE ST~T : LSD : 153.C0 ** FORMAT I.qC. UNITS ENTRY BLOCKS TYPE ENTRY E~SCRiPTION 4 1 gEPTHS ~ECRE~SE 8 6C.0 FRAME SPACING 9 .lIN FRAME SPACING UNITS 11 18 MAXIMUM FRA~qES/E;COR8 0 TERMINATOR -0.500 LEVEL SPACING DATUM SPECIFICATION BLOCKS 27.6~5 18,=,4.215 C.,~45 27.6C7 185~.215 0.345 TEMP RILM TEM~ SPg RZLF C.gOO 19.998 1COOC.COO O.OO0 lg.99~ CURVE REPR NAME CODE SiZE Immm~m immm mlm~ CILD 68 4 GR 68 4 CAL 68 4 TTEN 68 4 RFOC 68 4 RILD 68 4 ** FORMAT ** SAMPLE LNITS 1 MMHC I A~i I IN 1 LBF 1 DIM I OHMM I OHMM CURVE REgR NAME CCCE SIZE --IlIiI IIII SP 6~ T~P 65 4 CbT 68 SPD 6~ AC 68 4 R~LM ~ S~MPLE 1 1 1 1 1 1 UNITS ~V L2F ~/MN US/F CHMN ENTRY BLOCKS TYPE ENTRY DESCR 4 I CEPTH 8 6C.0 FRAME 9 .JIN F~A~E 11 18 M~XIM 0 TER~I -C.5C0 LEVEL IPTION S CF. CRE$SE S~4CING ,SPACING UNITS UM FR,~MES/RECOR~ NATOR SPACING tATUM SPECIFICSTICN 5LOCKS CURVE REpm NAME COCE SiZ£ SA~,~mLE LN CILD 6~ 4 I M SR 65 4 1 ~ CAL 63 4 1 Z TTEN 63 ~ 1 L ~C.2 6~ 4 1 C RFOC 68 4 1 0 RILD 6~ ~ 1 0 ITS t.l~ C ~T N H r,4rv MMM ** DATA ** DEPTH 7C13.C0C FT 2137.567C M D~mTH 7CCO.CCC ~T 2133.~C~C M CILD 3~o.742 SR -11.7~2 CAL 12.4C8 C~T -115CO.CCO ~CO O.O00 ~C 47.~C~ RILO 2.727 CEPTH 6900.G00 FT 2103.12/,C M C!LD 4Q8.133 SP -5.122 CAL 12.419 CHT -115C0.C00 4CO O. COO aC 96.~_r~9 RILD 2.C07 DEPTH 6800.CC0 ~T 2C72.644C M CILO 494.757 SD -42.352 CAL 11.~94 C~T -115CC.CC0 CU~V~ REP~ N~E CCgE SiZE IIII IIlI S~ ~8 4 T:vP ~,~ 4 CbT :3 4 R' LM fB 4 GR TT EN RFOC TTEN RFOC GR TTEN R~OC GR TTEN 22C7.97Q 2.562 a2.czc ~12~ ~c7 2.7~? dC.Z3C 3~ ~_ ~72.,5~~ 2i~m 46.778 3C42 .~14 S~MPL5 1 ! 1 1 t ! TEMF qlLm TEMP SPD RILP TEMF SPD RIL~ TEMP SPD UNITS ~V CEGF ~/MN US/: CMMM C.O00 2.c04 2~.870 26.¢97 2.133 0.000 26.997 RILD 2.C21 DEPTH 67C0.CC0 FT 2C42.164C M mmmmmmmmmmmmmmmmmmmmmmm-- CILO 477.377 Sm -29.627 CAL 1 2. 034 CHT -11 ~CC . C~,~ ~CQ O.CCO AC ~8.3c1~ RILO 2.C95 OE~TH 66C0.CCC FT 2011.684C M CiLO 439.271 SP -5C.917 CAL 12.133 CMT -11500.CC0 AC~ O.CCO AC 92.525 RiLO 2.275 CEPTH 65C'.0.CC0 FT 19.~1.204C M CILD 653.325 S~ -a1.559 CAL 11.985 CHT -115CC.CC~ ~C~ 0.C00 ~C 92.5~2 RiLD 1.531 D~PTH 6400.CC0 FT !950.724C M Iii. CILD 83C'.045 CAL 12.115 ~C~ O.CeO RILD 1.2C5 -a5.471 -115C3.CC0 DEPTH 630~.CCC FT 1;Z,3.2~C M CILO 604.C~3 SP -43.5C7 CAL 12.279 C~T -115C,3.CC0 ~C:~ O.OOg ~C °4.6~1 RILD 1.555 CEmTH 62OS.CCC FT 1~.c.764C M CILO 54C.S36 S~ -~C.Z86 C~L 12.165 CPT -1150C.CCC ~CQ C.CC0 ~C 95.~59 RILD 1.829 C6PTh 610C.CCO FT 1~59.23~C M CILD 549.340 SP -3~.~1~ CAL 12.=n9~,. CmT -11=c~.~'. ~C~ O.CCC ~C 107.,~70 RILO 1 DEPTH 6COO.CCC FT 18;8.~C4C M CILO 465.~36 SP -46.523 C&L 12.2!7 CWT -115C3.C30 ~C~ 0.C30 ~C ~.175 RiLD 2.14~ 0EPTH 5::)25.5,30 FT 15,30.C'~C M CILD 327.730 SP -1~.~ C~L 12.1~.S C~T -115CC.CC0 4C~ O.CCO ~C 104.7C5 RILD 3.051 TT EN GR TTEN RFOC TTEN R;OC TTEN R"OC GR TTEN RF-CC GR TT~N GR TTEN G~ TTEN RFCC TTEN ~5 5cC 2.961 50.464 3014.93g _ 3.43~ ~6.791 2~53.957 5.0~.~ ~ 1~C 2~1~.11C 4.611 52.55£ 3.838 5C 4.1~ 4~ 19~ 293~ .~73 2.7~C 27~' 54c 4.514 72.72C 2793.521 3 · 919 NJ. LIv TENP RiLM TEMP RILN TEMP SPD RILP T~MP RILM T E,~,! F SPD RILM TEMF SPD RiL~' TEMF SPD RILN TEMP SPD RILM TEMP SPD RILM ~. b¥'i 0.000 26.997 2.2/,5 O.0OC 27.071 2.438 ~ 997 1.787 C m 0~' '''' 29 .~47 2~.13d 2.03g 29.997 2.287 C.OuO 1.073 37.202 2.554 C.OOO EN[~iNG CEPTfl ** $ILE TRAILEP ** FiLE N&ME: REPT SERVICE NAME: VERSION # : 1 OATE: 851111 NAXIMUM LENGTh: 1024 FILE TYPE: LC NEXT FILE NA~E: 1806.0960 M lO ~* TAPE TRAILER ** TAPE NAME: SERVICE NAME: PE;T ~4TE: ORIGIN O= 9AT~: FSYS TAPE CONTINUATION NEXT TAmE COM~ENTS: : 01 ** REEL TRAILE2 *~ REEL N~ME: SERVICE NAME: ~ITLIS CATE . OR~SIN O: DAT~: FSYS REEL CONTINUATION # N:XT PEEL N~E: COMMENTS: DRESSER AT RE~L ~EA~ER - 1 T~E ~E~CE~ - 1 :~LE M:ADE~ - 2 INFORMATION - 2 :ORMAT - 4 D~TA - 580 TABLE DUMP - 2 FiLE TRAILER - 2 T&P~ T~ILER - 1 ~EEL TRAILER - I : 01 L~S LIS CUSTOMER TAPE CRE~TED EY SDS PROGRAM ~ 2.0 TOTAL RECORDS: 5Q6 * ALASKA COMPUTING CENTER * ....... SCHLUMBERGER COMPANY NAME : ARCO ALASKA, INC. WELL NAME : DS 4-19 FIELD NAME : PRUDHOE BAY BOROUGH : NORTH SLOPE STATE : ALASKA API NUMBER : 500292179100 REFERENCE NO : 96057 RECEIVED JUN 2 B *1996 Oil & Gas Anchorage LIS Tape Verification Listing Schlumberger Alaska Computing Center 20-JUN-1996 14:48 PAGE: **** REEL HEADER **** SERVICE NAME : EDIT DATE : 96/06/20 ORIGIN : FLIC REEL NAME : 96057 CONTINUATION # : PREVIOUS REEL : CO~i~ENT : ARCO ALASKA INC, D.S. 4-19, PRUDHOE BAY, 50-029-21791-00 **** TAPE HEADER **** SERVICE NAME : EDIT DATE : 96/06/20 ORIGIN · FLIC TAPE NAME : 96057 CONTINUATION # : 1 PREVIOUS TAPE : COGENT : ARCO ALASKA INC, D.S. 4-19, PRUDHOE BAY, 50-029-21791-00 TAPE HEADER PRUDHOE BAY CASED HOLE WIRELINE LOGS WELL NAME: DS 4-19 APINUMBER: 500292179100 OPERATOR: ARCO ALASKA, INC. LOGGING COMPANY: SCHLUMBERGER WELL SERVICES TAPE CREATION DATE: 20-JUN-96 JOB NUMBER: 96057 LOGGING ENGINEER: D. WARNER OPERATOR WITNESS: M. REYNOLDS SURFACE LOCATION SECTION: 26 TOWNSHIP: liN RANGE: 1SE FNL: FSL: 908 FEL: FWL: 255 ELEVATION(FT FROM MSL O) KELLY BUSHING: 60.00 DERRICK FLOOR: 59.00 GROUND LEVEL: 21.00 WELL CASING RECORD 1ST STRING 2ND STRING 3RD STRING PRODUCTION STRING OPEN HOLE CASING DRILLERS CASING BIT SIZE (IN) SIZE (IN) DEPTH (FT) WEIGHT (LB/FT) 13.375 2984.0 72.00 9.625 6992.0 47.00 7.000 2993.0 26.00 5.500 3110.0 7.00 CURVE SHIFT DATA - ALL PASSES TO STANDARD(MEASURED DEPTH) LIS ~ape Verification Listing Schlumberger Alaska Computing Center 20-JUN-1996 14:48 BASELINE CURVE FOR SHIFTS LDWG TOOL CODE: BCS LDWG CURVE CODE: GR RUN NUMBER: PASS NUMBER: DATE LOGGED: LOGGING COMPANY: WESTERN ATLAS BASELINE DEPTH 88888.0 5613.5 5612.0 5554.0 5552.0 5537.5 5528.5 5523.5 5490.0 5487.5 5483.5 5478.5 5472.0 5467.5 5464.5 5454.5 5449.0 5442.0 5437.5 5413.5 5409.0 5405.0 5384.0 5379.0 5374.0 5372.0 53 67.5 5359.5 5359.0 5342.5 5341.0 5332.5 5330.5 5328.0 5317.5 5308.0 5301.5 5297.5 5295.0 5289.5 5278.0 5243.0 5235.5 5225.5 5210. 0 .......... EQUIVALENT UNSHIFTED DEPTH .......... GRCH TDTP 88889.5 88887.5 5553.5 5538.5 5524.0 5488.5 5480.0 5468.0 5455.5 5449.0 5441.5 5413.0 5382.5 5378.5 5375.0 5373.0 5360.0 5343.5 5333.5 5331.5 5301.5 5295.5 5289.5 5243.0 5235.0 5210.0 5613.0 5611.5 5553.5 5527.5 5488.5 5481.5 5470.5 5463.5 5437.0 5408.5 5406.0 5369.0 5360.0 5342.0 5329.0 5316.5 5310.0 5298.0 5279.0 5227.0 PAGE: LIS Tape Verification Listing Schlumberger Alaska Computing Center 5186.5 5183.5 5181.5 5178.0 5167.5 5155.5 5151.5 5147 0 5137 0 5133 0 5132 0 5120 5 5120 0 5105 0 51 O4 0 5078.5 5076.5 5070.0 5069.5 5065.5 5047.5 5038. 0 5035.5 5027.5 5021.0 5010.5 4994.5 4990.5 4978.5 4955. 0 4948.0 4943.0 4940 0 4920 5 4913 5 4895 5 4887 5 4882 0 4869.5 4866.5 4864.5 4853.5 4827.5 4826.0 4793.5 4774.5 4767.5 4756.5 4737.5 4720. 0 4716.5 4707.5 4705. 0 4698.0 4679.0 4678. 0 5182.0 5156.0 5151.5 5148.0 5139.5 5133.0 5121.0 5105.5 5079.5 5069.5 5064.0 5047.5 5038.0 5028.0 5011.0 4994.0 4991.0 4956.5 4942.5 4939.5 4867.5 4865.0 4827.0 4776.0 4770.0 4757.5 4720.5 4718.0 4709.0 4699.5 4679.0 5188.5 5185.0 5178.5 5168.5 5156.0 5148.0 5133.0 5121.0 5105.5 5078.0 5070.5 5035.5 5021.5 4991.0 4981.0 4949.0 4921.5 4916.0 4894.0 4888.0 4882.5 4870.5 4854.5 4829.0 4795.5 4739.0 4718.0 4706.5 4679.5 20-JUN-1996 14:48 PAGE: LIS ~ape Verification Listing Schlumberger Alaska Computing Center 4673.0 4648.5 4637.0 4632.0 4607.0 4596.0 4587.0 4556.0 4554.0 4538.0 4525.5 4523.5 4521.5 4520.5 4516.5 4510.0 4504.5 4484.0 4469.5 4455.0 4454.0 4447.0 4444.5 4442.0 4421.5 4357.0 4340.5 4333.0 4318.0 4316.5 4315.0 4304.0 4297.5 4285.5 4281.5 4280.0 4277.0 4272 5 4268 5 4251 5 4242 5 4230 0 4223 5 4220.0 4216.0 4215.0 4202.5 4196.0 4180.0 4160.0 4159.5 4151.0 4144.5 4143.0 4138.0 4131.0 4675.0 4650.0 4638.0 4633.0 4606.5 4586.0 4557.0 4554.0 4538.5 4527.0 4524.0 4519.0 4510.5 4504.0 4485.0 4468.5 4454.0 4446.0 4443.5 4358.0 4333.0 4317.5 4314.5 4313.5 4302.0 4295.5 4280.5 4269.5 4231.0 4220.5 4216.5 4202.0 4180.5 4159.0 4151.5 4145.5 4130.5 20-JUN-1996 14:48 4597.0 4524.0 4520.5 4454.0 4444.0 4420.5 4340.0 4286.5 4282.5 4277.0 4274.5 4251.5 4243.0 4224.0 4216.5 4197.5 4180.5 4159.5 4146.0 4139.0 4132.0 PAGE: LIS Tape Verification Listing Schlumberger Alaska Computing Center 4117.0 4096.0 4083.0 4075.0 4067.5 4064.5 4056.5 4056.0 4048.0 4038.0 4033.0 4017.5 4013.0 4011.5 4001.5 3990.5 3986.0 3972.5 3972.0 3958.0 3956.5 3943.0 3935.0 3924.5 3918.0 3914.5 3908.5 3897.5 3871.5 3857.0 3852.0 3850.5 3845.5 3839.0 3830 5 3797 5 3782 0 3758 0 3734 5 3712 0 3705.5 3694.5 3693.5 3677.0 3669.5 3621 . 0 3609.5 3571.5 3558.0 3553.5 3541 . 0 3531.0 3514.0 3495.5 3494.5 3486.0 4096.5 4083.5 4067.5 4057.0 4033.0 4011.5 4001.5 3989.5 3970.0 3957.0 3914.5 3858.5 3852.5 3713.0 3694.0 3678.0 3671.5 3611.0 3573.0 3495.5 3487.5 4117.5 4077.0 4065.0 4057.0 4048.0 4038.0 4016.0 4011.5 3983.5 3970.0 3956.5 3945.0 3935.5 3925.0 3918.5 3909.5 3899.5 3874.5 3858.0 3852.5 3845.5 3840.0 3829.5 3797.5 3782.0 3758.0 3735.5 3705.0 3693.5 3621.0 3558.5 3553.5 3540.0 3531.5 3513.5 3495.5 20-JUN-1996 14:48 PAGE: LIS Tape Verification Listing Schlumberger Alaska Computing Center 20-JUN-1996 14: 48 3477.0 3477.0 3472.5 3474.5 3462.0 3461.5 3461 . 5 3462.0 3459.5 3459.0 3446.0 3446.5 3445.5 3446.0 3440.5 3442.0 3438.5 3439.0 3431.5 3432.0 3427.5 3428.5 3427.0 3428.5 3420.5 3422.5 3414.5 3414.0 3403.0 3403.5 3399.0 3400.0 3394.5 3395.5 3392.0 3392.0 3381.5 3382.5 3368.5 3368.5 3364.0 3363.5 3362.5 3363.5 3360.5 3361.0 3351.0 3351.5 3335.0 3335.5 3316.0 3316.0 3306.5 3307.5 3300.0 3300.5 3262.5 3262.5 3256.5 3256.0 3221.5 3224.0 3213.0 3213.0 3205.0 3205.0 3188.5 3188.5 3181.0 3181.0 3166.5 3167.0 3156.5 3157.0 3150.0 3150.0 3147.0 3147.5 3114.0 3113.0 100.0 99.0 100.0 $ REMARKS: THIS DATA REPRESENTS LDWG FORMATTED CASED HOLE TDTP ACQUIRED ON ARCO WELL D.S. 4-19. ONLY ONE BASELINE PASS WAS LOGGED SO NO ARITH~IETIC AVERAGE WAS DONE ON BASELINE PASS DATA. $ PAGE: LIS ~ape Verification Listing Schlumberger Alaska Computing Center 20-JUN-1996 14:48 PAGE: **** FILE HEADER **** FILE NAME : EDIT .001 SERVICE : FLIC VERSION : O01CO1 DATE : 96/06/20 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER: 1 EDITED CURVES Depth shifted and clipped curves for each pass in separate files. PASS NUMBER: 1 DEPTH INCREMENT: 0.5000 FILE SOW~VARY LDWG TOOL CODE START DEPTH STOP DEPTH GRCH 5592.0 3092.0 TDTP 5622.0 3092.0 $ CURVE SHIFT DATA - PASS TO PASS (MEASURED DEPTH) BASELINE CURVE FOR SHIFTS LDWG CURVE CODE: GR PASS ~FUMBER: .......... EQUIVALENT UNSHIFTED DEPTH .......... BASELINE DEPTH GRCH TDTP $ REMARKS: THE DATA IN THIS FILE IS OF THE BASE PASS TDTP. NO PASS TO PASS SHIFTS WERE APPLIED TO THIS DATA. $ LIS FORMAT DATA TABLE TYPE : CONS TO]VI VALU DEFI CN FN WN APIN FL SECT TOWN ARCO ALASKA, INC. PRUDHOE BAY DS 4-19 500292179100 0908' FSL & 0255' FWL 26 liN Company Name Field Name Well Name API Serial Number Field Location Section Township LIS ~ape Verification Listing Schlumberger Alaska Computing Center 20-JUN-1996 14:48 PAGE: 8 TUNI VALU DEFI RANG 15E Range COUN NORTH SLOPE County STAT ALASKA State or Province NATI USA Nati on WITN M. REYNOLDS Wi tness Name SON 100307 Service Order Number PDA T MSL Permanent datum EPD FT O. Elevation of Permanent Datum LMF RKB Log Measured From APD FT 60. Above Permanent Datum EKB FT 60. Elevation of Kelly Bushing EDF FT 59. Elevation of Derrick Floor EGL FT 21. Elevation of Ground Level TDD FT 5612. Total Depth - Driller BLI FT 5629. Bottom Log Interval TLI FT 3092. Top Log Interval DFT SEAWATER/BORAX Drilling Fluid Type TABLE TYPE : CURV DEFI DEPT Dep th SIGM Sigma (Neutron Capture Cross Section) TPHI TDT Porosity SBHF Borehole Sigma ~ far detector SBHN Borehole Sigma - Near detector SIGC Sigma Correction SIBH Corrected Borehole Sigma TRAT Ration Total Near to Far counts SDSI Standard deviation of Sigma BACK Background Count Rates - Near Detector FBAC Background Count Rate - Far Detector TCAN Total counts analyzed - near detector (TDTP) TCAF Total counts analyzed - far detector (TDTP) TCND Total capture counts - Near detector TCFD Total capture Counts - far dectector TSCN Total Selected Counts - Near Detector TSCF Total Selected Counts - Far Detector INND Inelastic count rate - near detector INFD Inelastic count rate - far detector GRCH Gamma Ray in Casing TENS Surface Tension CCL CCL Amplitude GR API-Corrected Gamma Ray LIS ~ape Verification Listing Schlumberger Alaska Computing Center 20-JUN-1996 14:48 PAGE: 9 ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 92 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 11 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 0 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 100307 O0 000 O0 0 1 1 1 4 68 0000000000 SIGM TDTP CU 100307 O0 000 O0 0 1 1 1 4 68 0000000000 TPHI TDTP PU-S 100307 O0 000 O0 0 1 1 1 4 68 0000000000 SBHF TDTP CU 100307 O0 000 O0 0 1 1 1 4 68 0000000000 SBHN TDTP CU 100307 O0 000 O0 0 1 1 1 4 68 0000000000 SIGC TDTP CU 100307 O0 000 O0 0 1 1 1 4 68 0000000000 SIBH TDTP CU 100307 O0 000 O0 0 1 1 1 4 68 0000000000 TRAT TDTP 100307 O0 000 O0 0 1 1 1 4 68 0000000000 SDSI TDTP CU 100307 O0 000 O0 0 1 1 1 4 68 0000000000 BACK TDTP CPS 100307 O0 000 O0 0 1 1 1 4 68 0000000000 FBAC TDTP CPS 100307 O0 000 O0 0 1 1 1 4 68 0000000000 TCAN TDTP CPS 100307 O0 000 O0 0 1 1 1 4 68 0000000000 TCAF TDTP CPS 100307 O0 000 O0 0 1 1 1 4 68 0000000000 TCND TDTP CPS 100307 O0 000 O0 0 1 1 1 4 68 0000000000 TCFD TDTP CPS 100307 O0 000 O0 0 1 1 1 4 68 0000000000 TSCN TDTP CPS 100307 O0 000 O0 0 1 1 1 4 68 0000000000 TSCF TDTP CPS 100307 O0 000 O0 0 1 1 1 4 68 0000000000 INND TDTP CPS 100307 O0 000 O0 0 1 1 1 4 68 0000000000 INFD TDTP CPS 100307 O0 000 O0 0 1 1 1 4 68 0000000000 GRCH TDTP GAPI 100307 O0 000 O0 0 1 1 1 4 68 0000000000 TENS TDTP LB 100307 O0 000 O0 0 1 1 1 4 68 0000000000 CCL TDTP V 100307 O0 000 O0 0 1 1 1 4 68 0000000000 GR BCS GAPI 100307 O0 000 O0 0 1 1 1 4 68 0000000000 LIS ~ape Verification Listing Schlumberger Alaska Computing Center 20-JUN-1996 14:48 PAGE: 10 ** DATA ** DEPT. 6953 . 000 SIGM. TDTP -999. 250 TPHI. TDTP -999. 250 SBHF. TDTP -999. 250 SBHN. TDTP -999.250 SIGC. TDTP -999.250 SIBH. TDTP -999.250 TRAT. TDTP -999.250 SDSI. TDTP -999.250 BACK. TDTP -999.250 FBAC. TDTP -999.250 TCAN. TDTP -999.250 TCAF. TDTP -999.250 TCND. TDTP -999.250 TCFD. TDTP -999.250 TSCN. TDTP -999.250 TSCF. TDTP -999.250 INND. TDTP -999.250 INFD. TDTP -999.250 GRCH. TDTP -999.250 TENS. TDTP -999.250 CCL. TDTP -999.250 GR.BCS 69.328 DEPT. 2978. 000 SIGM. TDTP -999. 250 TPHI. TDTP SBHN. TDTP -999. 250 SIGC. TDTP -999. 250 SIBH. TDTP SDSI. TDTP -999. 250 BACK. TDTP -999. 250 FBAC. TDTP TCAF. TDTP -999. 250 TCND. TDTP -999. 250 TCFD. TDTP TSCF. TDTP -999. 250 INND. TDTP -999. 250 INFD. TDTP TENS. TDTP - 999. 250 CCL. TDTP - 999. 250 GR. BCS - 999. 250 SBHF. TDTP -999. 250 TRAT. TDTP -999. 250 TCAN. TDTP - 999. 250 TSCN. TDTP -999. 250 GRCH. TDTP 25. 228 -999.250 -999.250 -999.250 -999.250 -999.250 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .001 SERVICE : FLIC VERSION : O01CO1 DATE : 96/06/20 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .002 SERVICE · FLIC VERSION : O01CO1 DATE : 96/06/20 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE~BER: 2 EDITED CURVES Depth shifted and clipped curves for each pass in separate files. PASS NUMBER: 2 DEPTH INCREMENT: O. 5000 FILE SU~94ARY LDWG TOOL CODE START DEPTH GRCH 5584.0 TDTP 5573.0 STOP DEPTH 5386.0 5386.0 LIS ~ape Verification Listing Schlumberger Alaska Computing Center 20-JUN-1996 14:48 PAGE: 1i CURVE SHIFT DATA - PASS TO PASS (MEASURED DEPTH) BASELINE CURVE FOR SHIFTS LDWG CURVE CODE: GRCH PASS NUMBER: 1 BASELINE DEPTH .............. .......... EQUIVALENT UNSHIFTED DEPTH .......... GRCH TDTP REMARKS: THE DATA IN THIS FILE REPRESENTS CASED HOLE TDTP BORAX PASS #1. THE DEPTH SHIFTS SHOWN ABOVE REFLECT BORAX PASS #1 GRCH TO BASE PASS #1 AND BORA3fPASS #1 SIGMA TO BASE PASS #1 SIGMA. ALL OTHER TDTP CURVES WERE CARRIED WIHT THE SIGMA SHIFTS. $ LIS FORMAT DATA 88888.0 88892.0 88888.5 5576.0 5580.0 5570.0 5570.5 5554.5 5558.0 5546.5 5546.5 5517.5 5520.0 5516.0 5517.5 5512.0 5512.0 5503.0 5503.5 5500.5 5504.0 5492.0 5495.0 5491.5 5491.5 5483.0 5486.0 5481.5 5481.5 5478.0 5480.5 5475.0 5478.0 5471.5 5474.0 5470.0 5470.0 5463.5 5466.5 5457.0 5457.0 5453.0 5452.0 5439.0 5441.5 5436.5 5437.5 5431.5 5431.5 5406.0 5408.5 5399.0 5401.5 5397.0 5400.0 5396.5 5400.0 5394.0 5397.0 5391.0 5394.0 100.0 103.0 103.0 $ LIS ~ape Verification Listing Schlumberger Alaska Computing Center 20-JUN-1996 14:48 PAGE: 12 TABLE TYPE : CONS TUNI VALU DEFI CN ARCO ALASKA, INC. FN PRUDHOE BAY WN DS 4-19 APIN 500292179100 FL 0908' FSL & 0255' FWL SECT 26 TOWN 11N RANG 15E COUN NORTH SLOPE STAT ALASKA NATI USA WITN M. REYNOLDS SON 100307 PDAT MSL EPD FT O . LMF RKB APD FT 60. EKB FT 60. EDF FT 59. EGL FT 21. TDD FT 5612. BLI FT 5629. TLI FT 3092. D FT SEAWA TER /BORAX Company Name Field Name Well Name API Serial Number Field Location Section Township Range County State or Province Nation Wi tness Name Service Order Number Permanent datum Elevation of Permanent Datum Log Measured From Above Permanent Datum Elevation of Kelly Bushing Elevation of Derrick Floor Elevation of Ground Level Total Depth - Driller Bottom Log Interval Top Log Interval Drilling Fluid Type TABLE TYPE : CURV DEFI DEPT SIGM TPHI SBHF SBHN SIGC SIBH TRA T SDSI BACK FBAC TCAN TCAF TCND TCFD TSCN TSCF INND INFD GRCH Depth Sigma (Neutron Capture Cross Section) TDT Porosity Borehole Sigma - far detector Borehole Sigma - Near detector Sigma Correction Corrected Borehole Sigma Ration Total Near to Far counts Standard deviation of Sigma Background Count Rates - Near Detector Background Count Rate - Far Detector Total counts analyzed - near detector (TDTP) Total counts analyzed - far detector (TDTP) Total capture counts - Near detector Total capture Counts - far dectector Total Selected Counts - Near Detector Total Selected Counts - Far Detector Inelastic count rate - near detector Inelastic count rate - far detector Gamma Ray in Casing LIS ~ape Verification Listing Schlumberger Alaska Computing Center 20-JUN-1996 14:48 PAGE: 13 DEFI TENS Surface Tension CCL CCLAmplitude ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 88 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 11 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD IVTJMB SAMP ELEM CODE (HEX) DEPT FT 100307 O0 000 O0 0 2 1 1 4 68 0000000000 SIGM TDTP CU 100307 O0 000 O0 0 2 1 1 4 68 0000000000 TPHI TDTP PU-S 100307 O0 000 O0 0 2 1 1 4 68 0000000000 SBHF TDTP CU 100307 O0 000 O0 0 2 1 1 4 68 0000000000 SBHN TDTP CU 100307 O0 000 O0 0 2 1 1 4 68 0000000000 SIGC TDTP CU 100307 O0 000 O0 0 2 1 1 4 68 0000000000 SIBH TDTP CU 100307 O0 000 O0 0 2 1 1 4 68 0000000000 TRAT TDTP 100307 O0 000 O0 0 2 1 1 4 68 0000000000 SDSI TDTP CU 100307 O0 000 O0 0 2 1 1 4 68 0000000000 BACK TDTP CPS 100307 O0 000 O0 0 2 1 1 4 68 0000000000 FBAC TDTP CPS 100307 O0 000 O0 0 2 1 1 4 68 0000000000 TCAN TDTP CPS 100307 O0 000 O0 0 2 1 1 4 68 0000000000 TCAF TDTP CPS 100307 O0 000 O0 0 2 1 1 4 68 0000000000 TCND TDTP CPS 100307 O0 000 O0 0 2 1 1 4 68 0000000000 TCFD TDTP CPS 100307 O0 000 O0 0 2 1 1 4 68 0000000000 TSCN TDTP CPS 100307 O0 000 O0 0 2 1 1 4 68 0000000000 TSCF TDTP CPS 100307 O0 000 O0 0 2 1 1 4 68 0000000000 LIS ~ape Verification Listing Schlumberger Alaska Computing Center 20-JUN-1996 14:48 PAGE: 14 NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) INND TDTP CPS 100307 O0 000 O0 0 2 1 1 4 68 0000000000 INFD TDTP CPS 100307 O0 000 O0 0 2 1 1 4 68 0000000000 GRCH TDTP GAPI 100307 O0 000 O0 0 2 1 1 4 68 0000000000 TENS TDTP LB 100307 O0 000 O0 0 2 1 1 4 68 0000000000 CCL TDTP V 100307 O0 000 O0 0 2 1 1 4 68 0000000000 ** DATA ** DEPT. 5588. 000 SIGM. TDTP -999.250 TPHI. TDTP -999.250 SBHF. TDTP SBHN. TDTP -999. 250 SIGC. TDTP -999. 250 SIBH. TDTP -999. 250 TRAT. TDTP SDSI. TDTP -999.250 BACK. TDTP -999.250 FBAC. TDTP -999.250 TCAN. TDTP TCAF. TDTP -999.250 TCND. TDTP -999.250 TCFD. TDTP -999.250 TSCN. TDTP TSCF. TDTP -999.250 INND. TDTP -999.250 INFD. TDTP -999.250 GRCH. TDTP TENS. TDTP -999. 250 CCL. TDTP -999. 250 DEPT. 5389. 000 SIGM. TDTP 25. 659 TPHI. TDTP 25. 003 SBHF. TDTP SBHN. TDTP 90. 172 SIGC. TDTP O. 841 SIBH. TDTP 110.287 TRAT. TDTP SDSI. TDTP 1 . 173 BACK. TDTP 112.295 FBAC. TDTP 19. 274 TCAN. TDTP TCAF. TDTP 2898. 621 TCND. TDTP 8456. 621 TCFD. TDTP 2799. 472 TSCN. TDTP TSCF. TDTP 570. 182 INND. TDTP 2132. 955 INFD. TDTP 371. 759 GRCH. TDTP TENS. TDTP 1065. 000 CCL. TDTP -0.209 -999.250 -999.250 -999.250 -999.250 35.906 77. 055 1. 282 5830. 943 1143. 428 47. 969 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .002 SERVICE · FLIC VERSION : O01CO1 DATE : 96/06/20 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .003 SERVICE : FLIC VERSION : O01CO1 DATE : 96/06/20 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : LIS Tape Verification Listing Schlumberger Alaska Computing Center 20-JUN-1996 14:48 PAGE: 15 FILE HEADER FILE NUMBER: 3 EDITED CURVES Depth shifted and clipped curves for each pass in separate files. PASS NUMBER: 3 DEPTH INCREMENT: 0.5000 FILE SUMFAARY LDWG TOOL CODE START DEPTH STOP DEPTH GRCH 5598.0 4998.0 TDTP 5629.0 4998.0 $ CURVE SHIFT DATA - PASS TO PASS (MEASURED DEPTH) BASELINE CURVE FOR SHIFTS LDWG CURVE CODE: GRCH PASS NUMBER: 1 BASELINE DEPTH .............. 88888.0 5613.0 5608.5 5560.5 5550.0 5518.0 5504.0 5495.0 5494.0 5481.5 5480.0 5472.5 5470.0 5459.5 5437.5 5412 5 5408 5 5407 0 5379 5 5374 0 5368 5 5368 0 5353.0 5347.5 5333.0 5332.5 5315.0 5313.0 5301.0 5290.0 5284.5 5270.0 5265.0 .......... EQUIVALENT UNSHIFTED DEPTH .......... GRCH TDTP 88888.0 88888.0 5504.0 5495.5 5480.0 5469.5 5413.0 5406.5 5369.5 5353.5 5348.5 5334.0 5315.0 5290.0 5284.0 5265. 0 5613.0 5608.5 5560.0 5550.5 5518.0 5494.0 5479.5 5470.5 5457.5 5437.0 5408.5 5379.0 5375.5 5369.0 5334.0 5313.0 5301.5 5270.0 LIS Tape Verification Listing Schlumberger Alaska Computing Center 20-JUN-1996 14:48 PAGE: 16 5252.0 5252.0 5231.0 5232.0 5228.0 5229.0 5216.5 5216.5 5216.0 5217.0 5210.5 5210.0 5197.0 5197.0 5182.0 5182.0 5178.0 5178.5 5171.0 5171.0 5172.0 5156.0 5156.0 5156.0 5148.0 5148.0 5136.5 5136.5 5129.0 5129.0 5120.0 5120.5 5119.0 5119.0 5109.0 5108.0 5096.5 5096.0 5073.5 5073.0 5073.0 5073.5 5064.5 5065.5 5053.0 5054.0 5048.0 5048.0 5035.5 5035.0 5034.5 5034.5 5021.5 5021.5 5015.0 5015.0 5011.0 5011.0 100.0 100.0 100.0 REMARKS: THIS FILE CONTAINS BORAX PASS #2. THE DEPTH ADJUSTMENTS SHOWN ABOVE REFLECT BORAX PASS #2 GRCH TO BASE PASS #1 GRCHANDBORAXPASS #2 SIGMA TO BASE PASS #1 SIGMA. ALL OTHER TDTP CURVES WERE CARRIED WITH THE SIGMA SHIFTS. $ LIS FORMAT DATA TABLE TYPE : CONS TUNI VALU DEFI CN FN WN APIN FL SECT TOWN RANG COUN STAT ARCO ALASKA, INC. PRUDHOE BAY DS 4-19 500292179100 0908' FSL & 0255' FWL 26 liN 1SE NORTH SLOPE ALASKA Company Name Field Name Well Name API Serial Number Field Location Section Township Range County State or Province LIS Tape Verification Listing Schlumberger Alaska Computing Center 20-JUN-1996 14:48 PAGE: 17 TUNI VALU DEFI NATI USA Nation WITN M. REYNOLDS Witness Name SON 100307 Service Order Number PDAT MSL Permanent datum EPD FT O. Elevation of Permanent Datum LMF RKB Log Measured From APD FT 60. Above Permanent Datum EKB FT 60. Elevation of Kelly Bushing EDF FT 59. Elevation of Derrick Floor EGL FT 21. Elevation of Ground Level TDD FT 5612. Total Depth - Driller BLI FT 5629. Bottom Log Interval TLI FT 3092. Top Log Interval DFT SEAWATER/BORAX Drilling Fluid Type TABLE TYPE : CURV DEFI DEPT Depth SIGM Sigma (Neutron Capture Cross Section) TPHI TDT Porosity SBHF Borehole Sigma - far detector SBHN Borehole Sigma - Near detector SIGC Sigma Correction SIBH Corrected Borehole Sigma TRAT Ration Total Near to Far counts SDSI Standard deviation of Sigma BACK Background Count Rates - Near Detector FBAC Background Count Rate - Far Detector TCAN Total counts analyzed - near detector (TDTP) TCAF Total counts analyzed - far detector (TDTP) TCND Total capture counts - Near detector TCFD Total capture Counts - far dectector TSCN Total Selected Counts - Near Detector TSCF Total Selected Counts - Far Detector INND Inelastic count rate - near detector INFD Inelastic count rate - far detector GRCH Gamma Ray in Casing TENS Surface Tension CCL CCL Amplitude LIS Tape Verification Listing Schlumberger Alaska Computing Center 20-JUN-1996 14:48 PAGE: 18 ** DATA FORMAT SPECIFICATION RECORD ** * * SET TYPE - 64EB * * TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 88 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 11 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 100307 O0 000 O0 0 3 1 1 4 68 0000000000 SIGM TDTP CU 100307 O0 000 O0 0 3 1 1 4 68 0000000000 TPHI TDTP PU-S 100307 O0 000 O0 0 3 1 1 4 68 0000000000 SBHF TDTP CU 100307 O0 000 O0 0 3 1 1 4 68 0000000000 SBHN TDTP CU 100307 O0 000 O0 0 3 1 1 4 68 0000000000 SIGC TDTP CU 100307 O0 000 O0 0 3 1 1 4 68 0000000000 SIBH TDTP CU 100307 O0 000 O0 0 3 1 1 4 68 0000000000 TRAT TDTP 100307 O0 000 O0 0 3 1 1 4 68 0000000000 SDSI TDTP CU 100307 O0 000 O0 0 3 1 1 4 68 0000000000 BACK TDTP CPS 100307 O0 000 O0 0 3 1 1 4 68 0000000000 FBAC TDTP CPS 100307 O0 000 O0 0 3 1 1 4 68 0000000000 TCAN TDTP CPS 100307 O0 000 O0 0 3 1 1 4 68 0000000000 TCAF TDTP CPS 100307 O0 000 O0 0 3 1 1 4 68 0000000000 TCND TDTP CPS 100307 O0 000 O0 0 3 1 1 4 68 0000000000 TCFD TDTP CPS 100307 O0 000 O0 0 3 1 1 4 68 0000000000 TSCN TDTP CPS 100307 O0 000 O0 0 3 1 1 4 68 0000000000 TSCF TDTP CPS 100307 O0 000 O0 0 3 1 1 4 68 0000000000 INND TDTP CPS 100307 O0 000 O0 0 3 1 1 4 68 0000000000 INFD TDTP CPS 100307 O0 000 O0 0 3 1 1 4 68 0000000000 GRCH TDTP GAPI 100307 O0 000 O0 0 3 1 1 4 68 0000000000 TENS TDTP LB 100307 O0 000 O0 0 3 1 1 4 68 0000000000 CCL TDTP V 100307 O0 000 O0 0 3 1 1 4 68 0000000000 LIS Tape Verification Listing Schlumberger Alaska Computing Center 20-JUN-1996 14:48 PAGE: 19 * * DA TA * * DEPT. 5629. 000 SIGM. TDTP SBHN. TDTP 126.618 SIGC. TDTP SDSI. TDTP 4.103 BACK. TDTP TCAF. TDTP 813.198 TCND. TDTP TSCF. TDTP 56.949 INND. TDTP TENS. TDTP 1045. 000 CCL. TDTP DEPT. 4998. 000 SIGM. TDTP SBHN. TDTP 97. 753 SIGC. TDTP SDSI. TDTP O. 671 BACK. TDTP TCAF. TDTP 4684. 906 TCND. TDTP TSCF. TDTP 958. 205 INND. TDTP TENS. TDTP 965. 000 CCL. TDTP 46.519 TPHI . TDTP 3. 095 SIBH. TDTP 122. 052 FBAC. TDTP 3940. 384 TCFD. TDTP 2209. 063 INFD. TDTP O. 001 13. 728 SBHF. TDTP 159. 761 TRAT. TDTP 48. 794 TCAN. TDTP 1173 . 350 TSCN. TDTP 404. 623 GRCH. TDTP 111.807 0.684 1508.766 87.774 -999.250 19.520 TPHI. TDTP 27.124 SBHF. TDTP 76.019 O. 001 SIBH. TDTP 122. 825 TRAT. TDTP 1. 456 138. 251 FBAC. TDTP 25. 818 TCAN. TDTP 9273. 328 8730. 330 TCFD. TDTP 3118. 948 TSCN. TDTP 1896. 676 2108. 428 INFD. TDTP 348. 068 GRCH. TDTP 38. 250 O. 037 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .003 SERVICE · FLIC VERSION : O01CO1 DATE · 96/06/20 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .004 SERVICE : FLIC VERSION : O01CO1 DATE : 96/06/20 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NIIMBER: 4 EDITED CURVES Depth shifted and clipped curves for each pass in separate files. PASS NUMBER: 4 DEPTH INCREMENT: O. 5000 FILE SU~g&~RY LDWG TOOL CODE START DEPTH GRCH 5586.0 TDTP 5542.0 STOP DEPTH .......... 5397.0 5397.0 LIS Tape Verification Listing Schlumberger Alaska Computing Center 20-JUN-1996 14:48 PAGE: 20 $ CURVE SHIFT DATA - PASS TO PASS (MEASURED DEPTH) BASELINE CURVE FOR SHIFTS LDWG CURVE CODE: GRCH PASSNUMBER: 1 BASELINE DEPTH 88888.0 5579.5 5574.0 5564.5 5558.5 5557.0 5542.0 5538.0 5537.0 5529.0 5518.5 5508.5 5502.0 5500.0 5494.5 5479.0 5477.0 5472.0 5468.5 5465.0 5463.5 5458.0 5455.5 5451.5 5449.0 5447.5 5444 5 5440 0 5431 5 5421 5 5421 0 5414 0 5412.5 5406.5 5401.5 5400.5 100.0 $ .......... EQUIVALENT UNSHIFTED DEPTH .......... GRCH TDTP 88887.0 5578.5 5574.5 5566.5 5560.5 5558.5 5544.0 5538.5 5531.0 5520.0 5503.0 5480.5 5478.0 5470.0 5458.5 5452.5 5449.0 5447.0 5431.5 5421.0 5413.0 5406.5 5401.5 101.0 88888.0 5537.0 5508.0 5499.5 5493.0 5477.0 5470.5 5465.0 5463.5 5452.0 5444.5 5440.5 5420.0 5413.0 5404.0 102.5 REMARKS: THIS FILE CONTAINS BORAX PASS #3 OF THE TDTP. THE DEPTH ADJUSTMENTS SHOWN ABOVE REFLECT BORAX PASS #3 GRCH TO BASE PASS #1 AND BORAX PASS #3 SIGMA TO BASE PASS #1 SIGMA. ALL OTHER TDTP CURVES WERE CARRIED WITH THE SIGMA SHIFTS. $ LIS Tape Verification Listing Schlumberger Alaska Computing Center 20-JUN-1996 14:48 PAGE: 21 LIS FORMAT DATA TABLE TYPE : CONS TUNI VALU DEFI CN ARCO ALASKA, INC. Company Name FN PRUDHOE BAY Field Name WN DS 4-19 Well Name APIN 500292179100 API Serial Number FL 0908' FSL & 0255' FWL Field Location SECT 26 Section TOWN liN Township RANG 1SE Range COUN NORTH SLOPE County STAT ALASKA State or Province NATI USA Na ti on WITN M. REYNOLDS Wi tness Name SON 100307 Service Order Number PDAT MSL Permanent datum EPD FT O. Elevation of Permanent Datum LMF RKB Log Measured From APD FT 60. Above Permanent Datum EKB FT 60. Elevation of Kelly Bushing EDF FT 59. Elevation of Derrick Floor EGL FT 21. Elevation of Ground Level TDD FT 5612. Total Depth - Driller BLI FT 5629. Bottom Log Interval TLI FT 3092. Top Log Interval DFT SEAWATER/BORAX Drilling Fluid Type TABLE TYPE : CURV DEFI DEPT SIGM TPHI SBHF SBHN SIGC SIBH TRAT SDSI BACK FBAC TCAN TCAF TCND TCFD TSCN Depth Sigma (Neutron Capture Cross Section) TDT Porosity Borehole Sigma - far detector Borehole Sigma - Near detector Sigma Correction Corrected Borehole Sigma Ration Total Near to Far counts Standard deviation of Sigma Background Count Rates - Near Detector Background Count Rate - Far Detector Total counts analyzed - near detector (TDTP) Total counts analyzed - far detector (TDTP) Total capture counts - Near detector Total capture Counts - far dectector Total Selected Counts - Near Detector LIS Tape Verification Listing Schlumberger Alaska Computing Center 20-JON-1996 14:48 PAGE: 22 DEFI TSCF Total Selected Counts - Far Detector INND Inelastic count rate - near detector INFD Inelastic count rate - far detector GRCH Gamma Ray in Casing TENS Surface Tension CCL CCL Amplitude ** DATA FORMAT SPECIFICATION RECORD ** * * SET TYPE - 64EB * * TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 88 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 11 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CI.~SS MODNr.~B S~v~P ELaM CODE (H.~:~) DEPT FT 100307 O0 000 O0 0 4 1 1 4 68 0000000000 SIGM TDTP CU 100307 O0 000 O0 0 4 1 1 4 68 0000000000 TPHI TDTP PU-S 100307 O0 000 O0 0 4 1 1 4 68 0000000000 SBHF TDTP CU 100307 O0 000 O0 0 4 1 1 4 68 0000000000 SBHN TDTP CU 100307 O0 000 O0 0 4 1 1 4 68 0000000000 SIGC TDTP CU 100307 O0 000 O0 0 4 1 1 4 68 0000000000 SIBH TDTP CU 100307 O0 000 O0 0 4 1 1 4 68 0000000000 TRAT TDTP 100307 O0 000 O0 0 4 1 1 4 68 0000000000 SDSI TDTP CU 100307 O0 000 O0 0 4 1 1 4 68 0000000000 BACK TDTP CPS 100307 O0 000 O0 0 4 1 1 4 68 0000000000 FBAC TDTP CPS 100307 O0 000 O0 0 4 1 1 4 68 0000000000 TCAN TDTP CPS 100307 O0 000 O0 0 4 1 1 4 68 0000000000 TCAF TDTP CPS 100307 O0 000 O0 0 4 1 1 4 68 0000000000 LIS Tape Verification Listing Schlumberger Alaska Computing Center 20-JUN-1996 14:48 PAGE: 23 NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER #LOG TYPE CLASS MOD NUMB S.2~P ELF_~ CODE (HEX) TCND TDTP CPS 100307 O0 000 O0 0 4 1 1 4 68 0000000000 TCFD TDTP CPS 100307 O0 000 O0 0 4 1 1 4 68 0000000000 TSCN TDTP CPS 100307 O0 000 O0 0 4 1 1 4 68 0000000000 TSCF TDTP CPS 100307 O0 000 O0 0 4 1 1 4 68 0000000000 INND TDTP CPS 100307 O0 000 O0 0 4 1 1 4 68 0000000000 INFD TDTP CPS 100307 O0 000 O0 0 4 1 1 4 68 0000000000 GRCH TDTP GAPI 100307 O0 000 O0 0 4 1 1 4 68 0000000000 TENS TDTP LB 100307 O0 000 O0 0 4 1 1 4 68 0000000000 CCL TDTP V 100307 O0 000 O0 0 4 1 1 4 68 0000000000 ** DATA ** DEPT. 5585. 000 SIGM. TDTP -999.250 TPHI. TDTP -999.250 SBHF. TDTP -999.250 SBHN. TDTP -999.250 SIGC. TDTP -999.250 SIBH. TDTP -999.250 TRAT. TDTP -999.250 SDSI. TDTP -999.250 BACK. TDTP -999.250 FBAC. TDTP -999.250 TCAN. TDTP -999.250 TCAF. TDTP -999.250 TCND. TDTP -999.250 TCFD. TDTP -999.250 TSCN. TDTP -999.250 TSCF. TDTP -999.250 INND. TDTP -999.250 INFD. TDTP -999.250 GRCH. TDTP 46.563 TENS. TDTP -999.250 CCL. TDTP -999.250 DEPT. 5398. 000 SIGM. TDTP -999. 250 TPHI. TDTP -999. 250 SBHF. TDTP -999. 250 SBHN. TDTP -999.250 SIGC. TDTP -999.250 SIBH. TDTP -999.250 TR~T. TDTP -999.250 SDSI. TDTP -999.250 BACK. TDTP -999.250 FBAC. TDTP -999.250 TCAN. TDTP -999.250 TCAF. TDTP -999.250 TCND. TDTP -999.250 TCFD. TDTP -999.250 TSCN. TDTP -999.250 TSCF. TDTP -999.250 INND. TDTP -999.250 INFD. TDTP -999.250 GRCH. TDTP 49. 469 TENS. TDTP -999. 250 CCL. TDTP -999. 250 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .004 SERVICE : FLIC VERSION : O01CO1 DATE : 96/06/20 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : LIS Tape Verification Listing Schlumberger Alaska Computing Center 20-JUN-1996 14:48 PAGE: 24 **** FILE HEADER **** FILE NAME : EDIT .005 SERVICE : FLIC VERSION : O01CO1 DATE : 96/06/20 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER 5 RAW CURVES Curves and log header data for each pass in separate files; raw background pass in last file PASS NUMBER: 1 DEPTH INCREMENT: O. 5000 FILE SU~4~fARY VENDOR TOOL CODE START DEPTH TDTP 5592.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME LOGGER ON BOTTOM: TD DRILLER (FT) : TD LOGGER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : LOGGING SPEED (FPHR): DEPTH CONTROL USED (YES/NO): STOP DEPTH 3092.0 09-FEB-96 CP 44.2 5612.0 0.0 3092.0 5629.0 1800.0 NO TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER ........... TDTP THERMAL DECAY EQF1 TDTP THERMAL DECAY CGRS-A- 860 TDTP THERMAL DECAY CPSC-A-805 TDTP THERMAL DECAY CPLS- A- 7 7 8 TDTP THERMAL DECAY TDIC-A- 816 TDTP THERMAL DECAY TNC- P- C390 TDTP THERMAL DECAY TND- P- C395 TDTP THERMAL DECAY TNG- P- B400 TDTP THERMAL DECAY CTSM-A-60 $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLERS CASING DEPTH (FT) : LOGGERS CASING DEPTH (FT) : 6992.0 LIS Tape Verification Listing Schlumberger Alaska Computing Center 20-JUN-1996 14:48 PAGE: 25 BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE TEMPERATURE (DEGF) : BOTTOM HOLE TEMPERATURE (DEGF): FLUID SALINITY (PPM) : FLUID LEVEL (FT) : FLUID RATE AT WELLHEAD (BPM) : WATER CUTS (PCT) : GAS~OIL RATIO: CHOKE (DEG) : SEAWATER/BOR3LY NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): THERMAL SANDSTONE 2.65 BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE TOP NORMALIZING WINDOW (FT) : BASE NORMALIZING WINDOW (FT) : BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (CPS): 0 FAR COUNT RATE HIGH SCALE (CPS): 13000 NEAR COUNT RATE LOW SCALE (CPS): 0 NEAR COUNT RATE HIGH SCALE (CPS): 30000 TOOL STANDOFF (IN): REMARKS: TIED INTO BHC (WA) DATED 4/6/88. DID BASELINE TEMP PASS FROM 2000' - TD MADE BASELINE TDT PASS FROM TD TO 3100'. PUMPED 290 BBLS BORAX FOLLOWED BY 310 BBLS OF SEAWATER. PUMPED @ 5-6 BPM WHILE DISPLACING AND LOGGING. CHANNEL APPEARS UP TO ABOUT 5545. THIS FILE CONTAINS THE RAW DATA OF BASE PASS #1. $ LIS FORMAT DATA TABLE TYPE : CONS TUNI VALU DEFI CN FN WN APIN FL SECT TOWN RANG COUN ARCO ALASKA, INC. PRUDHOE BAY DS 4-19 500292179100 0908' FSL & 0255' FWL 26 liN 1SE NORTH SLOPE Company Name Field Name Well Name API Serial Number Field Location Section Township Range County LIS Tape Verification Listing Schlumberger Alaska Computing Center 20-JUN-1996 14:48 PAGE: 26 TUNI VALU DEFI STAT ALASKA State or Province NA TI USA Nat i on WITN M. REYNOLDS Wi tness Name SON 100307 Service Order Number PDA T MSL Permanent datum EPD FT O. Elevation of Permanent Datum LMF RKB Log Measured From APD FT 60. Above Permanent Datum EKB FT 60. Elevation of Kelly Bushing EDF FT 59. Elevation of Derrick Floor EGL FT 21. Elevation of Ground Level TDD FT 5612. Total Depth - Driller BLI FT 5629. Bottom Log Interval TLI FT 3092. Top Log Interval DFT SEAWATER/BORAX Drilling Fluid Type TABLE TYPE : CURV DEFI DEPT Depth SIGM Sigma (Neutron Capture Cross Section) TPHI TDT Porosity SBHF Borehole Sigma - far detector SBHN Borehole Sigma - Near de¢ector SIGC Sigma Correction SIBH Corrected Borehole Sigma TRAT Ration Total Near to Far counts SDSI Standard deviation of Sigma BACK Background Count Rates - Near Detector FBAC Background Count Rate - Far Detector TCAN Total counts analyzed - near detector (TDTP) TCAF Total counts analyzed - far detector (TDTP) TCND Total capture counts - Near detector TCFD Total capture Counts - far dectector TSCN Total Selected Counts - Near Detector TSCF Total Selected Counts - Far Detector INND Inelastic count rate - near detector INFD Inelastic count rate - far detector TENS Surface Tension GR API-Corrected Gamma Ray CCL CCL Amplitude LIS Tape Verification Listing Schlumberger Alaska Computing Center 20-JUN-1996 14:48 PAGE: 27 ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 88 4 66 1 5 66 6 73 7 8 9 11 12 13 14 15 16 0 0.5 FT 11 65 68 65 66 68 66 0 65 FT 66 68 66 1 66 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 100307 O0 000 O0 0 5 1 1 4 68 0000000000 SIGM PS1 CU 100307 O0 000 O0 0 $ 1 1 4 68 0000000000 TPHI PS1 PU 100307 O0 000 O0 0 5 1 1 4 68 0000000000 SBHF PS1 CU 100307 O0 000 O0 0 5 1 1 4 68 0000000000 SBHN PS1 CU 100307 O0 000 O0 0 5 1 1 4 68 0000000000 SIGC PS1 CU 100307 O0 000 O0 0 $ 1 1 4 68 0000000000 SIBH PS1 CU 100307 O0 000 O0 0 5 1 1 4 68 0000000000 TRAT PS1 100307 O0 000 O0 0 5 1 1 4 68 0000000000 SDSI PS1 CU 100307 O0 000 O0 0 $ 1 1 4 68 0000000000 BACK PS1 CPS 100307 O0 000 O0 0 $ 1 1 4 68 0000000000 FBAC PS1 CPS 100307 O0 000 O0 0 5 1 1 4 68 0000000000 TCAN PS1 CPS 100307 O0 000 O0 0 $ 1 1 4 68 0000000000 TCAF PS1 CPS 100307 O0 000 O0 0 $ 1 1 4 68 0000000000 TCND PS1 CPS 100307 O0 000 O0 0 5 1 1 4 68 0000000000 TCFD PSl CPS 100307 O0 000 O0 0 5 1 1 4 68 0000000000 TSCN PS1 CPS 100307 O0 000 O0 0 5 1 1 4 68 0000000000 TSCF PS1 CPS 100307 O0 000 O0 0 5 1 1 4 68 0000000000 INND PS1 CPS 100307 O0 000 O0 0 5 1 1 4 68 0000000000 INFD PS1 CPS 100307 O0 000 O0 0 $ 1 1 4 68 0000000000 TENS PS1 LB 100307 O0 000 O0 0 5 1 1 4 68 0000000000 GR PS1 GAPI 100307 O0 000 O0 0 5 1 1 4 68 0000000000 CCL PS1 V 100307 O0 000 O0 0 5 1 1 4 68 0000000000 LIS Tape Verification Listing Schlumberger Alaska Computing Center 20-JUN-1996 14:48 PAGE: 28 ** DATA ** DEPT. 5636.000 SIGM. PS1 SBHN. PS1 50.998 SIGC. PS1 SDSI.PS1 0.778 BACK. PSi TCAF. PS1 8995.285 TCND. PS1 TSCF. PS1 1368.522 INND.PS1 GR.PS1 19.141 CCL.PS1 DEPT. 3091.000 SIGM. PSl SBHN. PS1 88.840 SIGC. PS1 SDSI.PS1 1.592 BACK. PSi TCAF. PS1 3918.434 TCND.PS1 TSCF. PS1 467.241 INND. PS1 GR.PS1 25.594 CCL.PS1 21.665 TPHI.PS1 5.024 SIBH. PS1 107.585 FBAC. PS1 20495.313 TCFD.PS1 2162.915 INFD. PS1 0.035 24.662 TPHI.PS1 3.279 SIBH. PS1 170.173 FBAC. PS1 9289.166 TCFD. PS1 2237.215 INFD.PS1 0.035 28.782 SBHF. PS1 51.246 TRAT. PS1 18.058 TCAN. PS1 6218.186 TSCN. PS1 364.531 TENS.PSI 20.378 SBHF. PS1 106.702 TRAT. PS1 27.445 TCAN. PS1 2807.443 TSCN. PS1 336.799 TENS. PSi 44.512 1.610 24267.434 3401.809 870.000 73.945 1.211 8807.361 923.449 765.000 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .005 SERVICE : FLIC VERSION : O01CO1 DATE : 96/06/20 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .006 SERVICE : FLIC VERSION : O01CO1 DATE : 96/06/20 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER 6 RAW CURVES Curves and log header data for each pass in separate files; raw background pass in last file PASS NUMBER: 2 DEPTH INCREMENT: 0.5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH TDTP 5618.0 5370.0 $ LIS Tape Verification Listing Schlumberger Alaska Computing Center 20-JUN-1996 14:48 PAGE: 29 LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME LOGGER ON BOTTOM: TD DRILLER (FT) : TD LOGGER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : LOGGING SPEED (FPHR): DEPTH CONTROL USED (YES/NO): 09-FEB-96 CP 44.2 5612.0 0.0 3092.0 5629.0 1800.0 NO TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER TDTP THERMAL DECAY EQF1 TDTP THERMAL DECAY CGRS-A-860 TDTP THERMAL DECAY CPSC-A-805 TDTP THERMAL DECAY CPLS-A- 778 TDTP THERMAL DECAY TDIC-A- 816 TDTP THERMAL DECAY TNC- P-C390 TDTP THERMAL DECAY TND- P- C395 TDTP THERMAL DECAY TNG- P-B400 TDTP THERMAL DECAY CTSM-A- 60 $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLERS CASING DEPTH (FT) : LOGGERS CASING DEPTH (FT) : BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE TEMPERATURE (DEGF) : BOTTOM HOLE TEMPERATURE (DEGF) : FLUID SALINITY (PPM) '. FLUID LEVEL (FT) : FLUID RATE AT WELLHEAD (BPM) : WATER CUTS (PCT) : GAS~OIL RATIO: CHOKE (DEG) : NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): 6992.0 S EAWA TER /BORAX THERMAL SANDSTONE 2.65 BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE TOP NORMALIZING WINDOW (FT) : BASE NORMALIZING WINDOW (FT) : BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (CPS) : 0 LIS Tape Verification Listing Schlumberger Alaska Computing Center 20-JUN-1996 14:48 PAGE: 30 FAR COUNT RATE HIGH SCALE (CPS): 13000 NEAR COUNT RATE LOW SCALE (CPS): 0 NEAR COUNT RATE HIGH SCALE (CPS): 30000 TOOL STANDOFF (IN): REMARKS: TIED INTO BHC (WA) DATED 4/6/88. DID BASELINE TEMP PASS FROM 2000' - TD MADE BASELINE TDT PASS FROM TD TO 3100'. PUMPED 290 BBLS BORAX FOLLOWED BY 310 BBLS OF SEAWATER. PUMPED @ 5-6 BPM WHILE DISPLACING AND LOGGING. CHANNEL APPEARS UP TO ABOUT 5545. THIS FILE CONTAINS THE RAW DATA OF BASE PASS REPEAT FILE. $ LIS FORMAT DATA TABLE TYPE : CONS TUNI VALU DEFI CN ARCO ALASKA, INC. Company Name FN PRUDHOE BAY Field Name WN DS 4-19 Well Name APIN 500292179100 API Serial Number FL 0908' FSL & 0255' FWL Field Location SECT 26 Section TOWN 1 iN Township RANG 15E Range COUN NORTH SLOPE County STAT ALASKA State or Province NATI USA Na ti on WITN M. REYNOLDS Wi tness Name SON 100307 Service Order Number PDAT MSL Permanent da turn EPD FT O. Elevation of Permanent Datum LMF RKB Log Measured From APD FT 60. Above Permanent Datum EKB FT 60. Elevation of Kelly Bushing EDF FT 59. Elevation of Derrick Floor EGL FT 21. Elevation of Ground Level TDD FT 5612. Total Depth - Driller BLI FT 5629. Bottom Log Interval TLI FT 3092. Top Log Interval DFT SEAWATER/BORAX Drilling Fluid Type TABLE TYPE : CURV DEFI DEPT Dep th SIGM Sigma (Neutron Capture Cross Section) LIS Tape Verification Listing Schlumberger Alaska Computing Center 20-JUN-1996 14:48 PAGE: 31 DEFI TPHI TDT Porosity SBHF Borehole Sigma - far detector SBHN Borehole Sigma - Near detector SIGC Sigma Correction SIBH Corrected Borehole Sigma TRAT Ration Total Near to Far counts SDSI Standard deviation of Sigma BACK Background Count Rates - Near Detector FBAC Background Count Rate - Far Detector TCAN Total counts analyzed - near detector (TDTP) TCAF Total counts analyzed - far detector (TDTP) TCND Total capture counts - Near detector TCFD Total capture Counts - far dectector TSCN Total Selected Counts - Near Detector TSCF Total Selected Counts - Far Detector INND Inelastic count rate - near detector INFD Inelastic count rate - far detector TENS Surface Tension GR API-Corrected Gamma Ray CCL CCL Amplitude ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** .............................. TYPE REPR CODE VALUE .............................. 1 66 0 2 66 0 3 73 88 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 11 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 LIS Tape Verification Listing Schlumberger Alaska Computing Center 20-JUN-1996 14:48 PAGE: 32 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 100307 O0 000 O0 0 6 1 1 4 68 0000000000 SIGM PS2 CU 100307 O0 000 O0 0 6 1 1 4 68 0000000000 TPHI PS2 PU 100307 O0 000 O0 0 6 1 1 4 68 0000000000 SBHF PS2 CU 100307 O0 000 O0 0 6 1 1 4 68 0000000000 SBHN PS2 CU 100307 O0 000 O0 0 6 1 1 4 68 0000000000 SIGC PS2 CU 100307 O0 000 O0 0 6 1 1 4 68 0000000000 SIBH PS2 CU 100307 O0 000 O0 0 6 1 1 4 68 0000000000 TRAT PS2 100307 O0 000 O0 0 6 1 1 4 68 0000000000 SDSI PS2 CU 100307 O0 000 O0 0 6 1 1 4 68 0000000000 BACK PS2 CPS 100307 O0 000 O0 0 6 1 1 4 68 0000000000 FBAC PS2 CPS 100307 O0 000 O0 0 6 1 1 4 68 0000000000 TCAN PS2 CPS 100307 O0 000 O0 0 6 1 1 4 68 0000000000 TCAF PS2 CPS 100307 O0 000 O0 0 6 1 1 4 68 0000000000 TCND PS2 CPS 100307 O0 000 O0 0 6 1 1 4 68 0000000000 TCFD PS2 CPS 100307 O0 000 O0 0 6 1 1 4 68 0000000000 TSCN PS2 CPS 100307 O0 000 O0 0 6 1 1 4 68 0000000000 TSCF PS2 CPS 100307 O0 000 O0 0 6 1 1 4 68 0000000000 INND PS2 CPS 100307 O0 000 O0 0 6 1 1 4 68 0000000000 INFD PS2 CPS 100307 O0 000 O0 0 6 1 1 4 68 0000000000 TENS PS2 LB 100307 O0 000 O0 0 6 1 1 4 68 0000000000 GR PS2 GAPI 100307 O0 000 O0 0 6 1 1 4 68 0000000000 CCL PS2 V 100307 O0 000 O0 0 6 1 1 4 68 0000000000 ** DATA ** DEPT. 5628.000 SIGM. PS2 22.652 TPHI.PS2 0.000 SBHF. PS2 SBHN. PS2 103.973 SIGC. PS2 0.000 SIBH. PS2 118.556 TRAT. PS2 SDSI.PS2 0.326 BACK. PS2 156.123 FBAC. PS2 25.224 TCAN. PS2 TCAF. PS2 0.000 TCND.PS2 -1764.822 TCFD. PS2 -291.580 TSCN. PS2 TSCF. PS2 0.000 INND.PS2 -5.307 INFD.PS2 -0.857 TENS. PS2 GR.PS2 24.344 CCL.PS2 0.043 DEPT. 5369.500 SIGM. PS2 21.665 TPHI.PS2 28.782 SBHF. PS2 SBHN. PS2 50.998 SIGC. PS2 5.024 SIBH. PS2 51.246 TRAT. PS2 SDSI.PS2 0.778 BACK. PS2 107.585 FBAC. PS2 18.058 TCAN. PS2 TCAF. PS2 8995.285 TCND. PS2 20495.313 TCFD.PS2 6218.186 TSCN. PS2 TSCF. PS2 1368.522 INND.PS2 2162.915 INFD.PS2 364.531 TENS. PS2 GR.PS2 39.375 CCL.PS2 -0.068 109.631 0.000 0.000 0.000 1160.000 44.512 1.610 24267.434 3401.809 1085.000 ** END OF DATA ** LIS Tape Verification Listing Schlumberger Alaska Computing Center 20-JUN-1996 14:48 PAGE: 33 **** FILE TRAILER **** FILE NAME : EDIT .006 SERVICE : FLIC VERSION · O01CO1 DATE : 96/06/20 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .007 SERVICE : FLIC VERSION : O01CO1 DATE : 96/06/20 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER 7 RAW CURVES Curves and log header data for each pass in separate files; raw background pass in last file PASS NUMBER: 1 DEPTH INCREMENT: 0.5000 FILE SUMFiARY VENDOR TOOL CODE START DEPTH STOP DEPTH 5573.0 5386.0 TDTP $ LOG HEADER DATA DATE LOGGED: 09-FEB-96 SOFTWARE VERSION: CP 44.2 TIME LOGGER ON BOTTOM: TD DRILLER (FT) : 5612.0 TD LOGGER (FT) : O. 0 TOP LOG INTERVAL (FT) : 3092.0 BOTTOM LOG INTERVAL (FT) : 5629.0 LOGGING SPEED (FPHR): 1800.0 DEPTH CONTROL USED (YES/NO): NO TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER TDTP THERMAL DECAY EQF1 TDTP THERMAL DE CA Y CGRS-A- 860 TDTP THERMAL DECAY CPSC-A-805 TDTP THERMAL DECAY CPLS-A- 778 TDTP THERMAL DECAY TDIC-A-816 TDTP THERMAL DECAY TNC- P-C390 LIS Tape Verification Listing Schlumberger Alaska Computing Center 20-JUN-1996 14:48 PAGE: 34 TDTP THERMAL DECAY TND- P-C395 TDTP THERMAL DECAY TNG- P- B400 TDTP THERMAL DECAY CTSM-A- 60 $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN) DRILLERS CASING DEPTH (FT) LOGGERS CASING DEPTH (FT) BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE TEMPERATURE (DEGF) : BOTTOM HOLE TEMPERATURE (DEGF) : FLUID SALINITY (PPM) : FLUID LEVEL (FT) : FLUID RATE AT WELLHEAD (BPM) : WATER CUTS (PCT) : GAS~OIL RATIO: CHOKE (DEG) : 6992.0 SEAWATER/BORAX NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): THERMAL SANDSTONE 2.65 BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE TOP NORMALIZING WINDOW (FT) : BASE NORMALIZING WINDOW (FT): BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (CPS): 0 FAR COUNT RATE HIGH SCALE (CPS): 13000 NEAR COUNT RATE LOW SCALE (CPS): 0 NEAR COUNT RATE HIGH SCALE (CPS): 30000 TOOL STANDOFF (IN): REMARKS: TIED INTO BHC (WA) DATED 4/6/88. DID BASELINE TEMP PASS FROM 2000' - TD MADE BASELINE TDT PASS FROM TD TO 3100'. PUMPED 290 BBLS BORAX FOLLOWED BY 310 BBLS OF SEAWATER. PUMPED @ 5-6 BPM WHILE DISPLACING AND LOGGING. CHANNEL APPEARS UP TO ABOUT 5545. THIS FILE CONTAINS BORAX PASS #1. $ LIS FORMAT DATA LIS Tape Verification Listing Schlumberger Alaska Computing Center 20-JUN-1996 14:48 PAGE: 35 TABLE TYPE : CONS TUNI VALU DEFI CN ARCO ALASKA, INC. Company Name FN PRUDHOE BAY Field Name WN DS 4-19 Well Name APIN 500292179100 API Serial Number FL 0908' FSL & 0255' FWL Field Location SECT 2 6 Sec ti on TOWN 1 IN Township RANG 15E Range COUN NORTH SLOPE County STAT ALASKA State or Province NA TI USA Nat i on WITN M. REYNOLDS Wi tness Name SON 100307 Service Order Number PDAT MSL Permanent da rum EPD FT O. Elevation of Permanent Datum LMF RKB Log Measured From APD FT 60. Above Permanent Datum EKB FT 60. Elevation of Kelly Bushing EDF FT 59. Elevation of Derrick Floor EGL FT 21. Elevation of Ground Level TDD FT 5612. Total Depth - Driller BLI FT 5629. Bottom Log Interval TLI FT 3092. Top Log Interval DFT SEAWATER/BORAX Drilling Fluid Type TABLE TYPE : CURV DEFI DEPT SIGM TPHI SBHF SBHN SIGC SIBH TRA T SDSI BACK FBAC TCAN TCAF TCND TCFD TSCN TSCF INND INFD TENS Depth Sigma (Neutron Capture Cross Section) TDT Porosity Borehole Sigma - far detector Borehole Sigma - Near detector Sigma Correction Corrected Borehole Sigma Ration Total Near to Far counts Standard deviation of Sigma Background Count Rates - Near Detector Background Count Rate - Far Detector Total counts analyzed - near detector (TDTP) Total counts analyzed - far detector (TDTP) Total capture counts - Near detector Total capture Counts - far dectector Total Selected Counts - Near Detector Total Selected Counts - Far Detector Inelastic count rate - near detector Inelastic count rate - far detector Surface Tension LIS Tape Verification Listing Schlumberger Alaska Computing Center 20-JUN-1996 14:48 PAGE: 3 6 DEFI GR API-Corrected Gamma Ray CCL CCL Ampl i rude ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 88 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 11 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 100307 O0 000 O0 0 7 1 1 4 68 0000000000 SIGM BX1 CU 100307 O0 000 O0 0 7 1 1 4 68 0000000000 TPHI BX1 PU 100307 O0 000 O0 0 7 1 1 4 68 0000000000 SBHF BX1 CU 100307 O0 000 O0 0 7 1 1 4 68 0000000000 SBHN BX1 CU 100307 O0 000 O0 0 7 1 1 4 68 0000000000 SIGC BX1 CU 100307 O0 000 O0 0 7 1 1 4 68 0000000000 SIBH BX1 CU 100307 O0 000 O0 0 7 1 1 4 68 0000000000 TRAT BX1 100307 O0 000 O0 0 7 1 1 4 68 0000000000 SDSI BX1 CU 100307 O0 000 O0 0 7 1 1 4 68 0000000000 BACK BX1 CPS 100307 O0 000 O0 0 7 1 1 4 68 0000000000 FBAC BX1 CPS 100307 O0 000 O0 0 7 1 1 4 68 0000000000 TCANBX1 CPS 100307 O0 000 O0 0 7 1 1 4 68 0000000000 TCAF BX1 CPS 100307 O0 000 O0 0 7 1 1 4 68 0000000000 TCND BX1 CPS 100307 O0 000 O0 0 7 1 1 4 68 0000000000 TCFD BX1 CPS 100307 O0 000 O0 0 7 1 1 4 68 0000000000 TSCN BX1 CPS 100307 O0 000 O0 0 7 1 1 4 68 0000000000 TSCF BX1 CPS 100307 O0 000 O0 0 7 1 1 4 68 0000000000 LIS Tape Verification Listing Schlumberger Alaska Computing Center 20-JUN-1996 14:48 PAGE: 37 NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) INND BX1 CPS 100307 O0 000 O0 0 7 1 1 4 68 0000000000 INFD BX1 CPS 100307 O0 000 O0 0 7 1 1 4 68 0000000000 TENS BX1 LB 100307 O0 000 O0 0 7 1 1 4 68 0000000000 GR BX1 GAPI 100307 O0 000 O0 0 7 1 1 4 68 0000000000 CCL BX1 V 100307 O0 000 O0 0 7 1 1 4 68 0000000000 ** DATA ** DEPT. 5630.500 SIGM. BX1 24 662 TPHI.BX1 20.378 SBHF. BX1 73.945 SBHN. BX1 88.840 SIGC. BX1 3 279 SIBH. BX1 106.702 TRAT.BX1 1.211 SDSI.BX1 1.592 BACK. BX1 170 173 FBAC.BX1 27.445 TCAN. BX1 8807.361 TCAF. BX1 3918.434 TCND.BX1 9289 166 TCFD.BX1 2807.443 TSCN. BX1 923.449 TSCF. BX1 467.241 INND.BX1 2237 215 INFD.BX1 336.799 TENS.BX1 855.000 GR.BX1 35.625 CCL.BX1 0 069 DEPT. 5385.000 SIGM. BX1 24.991 TPHI.BX1 25.983 SBHF. BX1 78.897 SBHN. BX1 90.609 SIGC.BX1 0.827 SIBH. BX1 111.142 TRAT. BX1 1.316 SDSI.BX1 0.866 BACK. BX1 110.529 FBAC. BX1 19.674 TCAN. BX1 6037.234 TCAF. BX1 2954.509 TCND.BX1 8434.391 TCFD.BX1 2767.991 TSCN. BX1 1148.041 TSCF. BX1 567.113 INND.BX1 2062.081 INFD.BX1 368.048 TENS.BX1 1055.000 GR.BX1 46.000 CCL.BX1 0.003 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .007 SERVICE · FLIC VERSION · O01CO1 DATE : 96/06/20 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .008 SERVICE : FLIC VERSION · O01CO1 DATE : 96/06/20 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : LIS Tape Verification Listing Schlumberger Alaska Computing Center 20-JUN-1996 14:48 PAGE: 38 FILE HEADER FILE NUMBER 8 RAW CURVES Curves and log header data for each pass in separate files; raw background pass in last file PASS NUMBER: 2 DEPTH INCREMENT: 0.5000 FILE SUM~U~Y VENDOR TOOL CODE START DEPTH TDTP 5629.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME LOGGER ON BOTTOM: TD DRILLER (FT) : TD LOGGER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : LOGGING SPEED (FPHR) : DEPTH CONTROL USED (YES/NO): TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TDTP THERMAL DECAY TDTP THERMAL DECAY TDTP THERMAL DECAY TDTP THERMAL DECAY TDTP THERMAL DECAY TDTP THERMAL DECAY TDTP THERMAL DECAY TDTP THERMAL DECAY TDTP THERMAL DECAY $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLERS CASING DEPTH (FT) : LOGGERS CASING DEPTH (FT) : BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE TEMPERATURE (DEGF) : BOTTOM HOLE TEMPERATURE (DEGF) : FLUID SALINITY (PPM) : FLUID LEVEL (FT) : FLUID RATE AT WELLHEAD (BPM) : WATER CUTS (PCT) : GAS~OIL RATIO: CHOKE (DEG) : STOP DEPTH 4998.0 09-FEB-96 CP 44.2 5612.0 0.0 3092.0 5629.0 1800.0 NO TOOL NUMBER EQF1 CGRS-A - 860 CPSC-A- 805 CPLS-A- 778 TDIC-A- 816 TNC- P- C390 TND- P- C395 TNG-P-B400 CTSM-A- 60 6992.0 SEAWATER/BORAX LIS Tape Verification Listing Schlumberger Alaska Computing Cen~er 20-JUN-1996 14:48 PAGE: 39 NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX.. MATRIX DENSITY: HOLE CORRECTION (IN): THERMAL SANDSTONE 2.65 BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE TOP NORMALIZING WINDOW (FT): BASE NORMALIZING WINDOW (FT) : BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (CPS): 0 FAR COUNT RATE HIGH SCALE (CPS): 13000 NEAR COUNT RATE LOW SCALE (CPS): 0 NEAR COUNT RATE HIGH SCALE (CPS): 30000 TOOL STANDOFF (IN): REMARKS: TIED INTO BHC (WA) DATED 4/6/88. DID BASELINE TEMP PASS FROM 2000' - TD MADE BASELINE TDT PASS FROM TD TO 3100'. PUMPED 290 BBLS BORAX FOLLOWED BY 310 BBLS OF SEAWATER. PUMPED @ 5-6 BPM WHILE DISPLACING AND LOGGING. CHANNEL APPEARS UP TO ABOUT 5545. THIS FILE CONTAINS BORAX PASS #2. $ LIS FORMAT DATA TABLE TYPE : CONS T UNI VAL U DEFI CN FN WN APIN FL SECT TOWN RANG COUN STAT NATI WITN SON PDA T EPD FT LMF APD FT EKB FT EDF FT EGL FT TDD FT BLI FT ARCO ALASKA, INC. PRUDHOE BAY DS 4-19 5002921791 O0 0908' FSL & 0255' FWL 26 liN 1SE NORTH SLOPE ALASKA USA M. REYNOLDS 100307 MSL O. RKB 60. 60. 59. 21. 5612. 5629. Company Name Field Name Well Name API Serial Number Field Location Section Township Range Court ty State or Province Nation Wi tness Name Service Order Number Permanent datum Elevation of Permanent Datum Log Measured From Above Permanent Datum Elevation of Kelly Bushing Elevation of Derrick Floor Elevation of Ground Level Total Depth - Driller Bottom Log Interval LIS Tape Verification Listing Schlumberger Alaska Computing Center 20-JUN-1996 14:48 PAGE: 40 TUNI VALU DEFI TLI FT 3092. Top Log Interval DFT SEAWATER/BORAX Dril 1 ing Fi uid Type TABLE TYPE : CURV DEFI DEPT Depth SIGM Sigma (Neutron Capture Cross Section) TPHI TDT Porosity SBHF Borehole Sigma - far detector SBHN Borehole Sigma - Near detector SIGC Sigma Correction SIBH Corrected Borehole Sigma TRAT Ration Total Near to Far counts SDSI Standard deviation of Sigma BACK Background Count Rates - Near Detector FBAC Background Count Rate - Far Detector TCAN Total counts analyzed - near detector (TDTP) TCAF Total counts analyzed - far detector (TDTP) TCND Total capture counts - Near detector TCFD Total capture Counts ~ far dectector TSCN Total Selected Counts - Near Detector TSCF Total Selected Counts - Far Detector INND Inelastic count rate - near detector INFD Inelastic count rate - far detector TENS Surface Tension GR API-Corrected Gamma Ray CCL CCL Amplitude ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 88 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 11 12 68 LIS Tape Verification Listing Schlumberger Alaska Computing Center 20-JUN-1996 14:48 PAGE: 41 TYPE REPR CODE VALUE 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 .............................. ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 100307 O0 000 O0 0 8 1 1 4 68 0000000000 SIGM BX2 CU 100307 O0 000 O0 0 8 1 1 4 68 0000000000 TPHI BX2 PU 100307 O0 000 O0 0 8 1 1 4 68 0000000000 SBHF BX2 CU 100307 O0 000 O0 0 8 1 1 4 68 0000000000 SBHN BX2 CU 100307 O0 000 O0 0 8 1 1 4 68 0000000000 SIGC BX2 CU 100307 O0 000 O0 0 8 1 1 4 68 0000000000 SIBH BX2 CU 100307 O0 000 O0 0 8 1 1 4 68 0000000000 TRAT BX2 100307 O0 000 O0 0 8 1 1 4 68 0000000000 SDSI BX2 CU 100307 O0 000 O0 0 8 1 1 4 68 0000000000 BACK BX2 CPS 100307 O0 000 O0 0 8 1 1 4 68 0000000000 FBAC BX2 CPS 100307 O0 000 O0 0 8 1 1 4 68 0000000000 TCANBX2 CPS 100307 O0 000 O0 0 8 1 1 4 68 0000000000 TCAF BX2 CPS 100307 O0 000 O0 0 8 1 1 4 68 0000000000 TCNDBX2 CPS 100307 O0 000 O0 0 8 1 1 4 68 0000000000 TCFD BX2 CPS 100307 O0 000 O0 0 8 1 1 4 68 0000000000 TSCN BX2 CPS 100307 O0 000 O0 0 8 1 1 4 68 0000000000 TSCF BX2 CPS 100307 O0 000 O0 0 8 1 1 4 68 0000000000 INNDBX2 CPS 100307 O0 000 O0 0 8 1 1 4 68 0000000000 INFD BX2 CPS 100307 O0 000 O0 0 8 1 1 4 68 0000000000 TENS BX2 LB 100307 O0 000 O0 0 8 1 1 4 68 0000000000 GR BX2 GAPI 100307 O0 000 O0 0 8 1 1 4 68 0000000000 CCL BX2 V 100307 O0 000 O0 0 8 1 1 4 68 0000000000 ** DATA ** DEPT. 5642.000 SIGM. BX2 24.991 TPHI.BX2 25.983 SBHF.BX2 SBHN. BX2 90.609 SIGC. BX2 0.827 SIBH. BX2 111.142 TRAT. BX2 SDSI.BX2 0.866 BACK. BX2 110.529 FBAC.BX2 19.674 TCAN. BX2 TCAF. BX2 2954.509 TCND.BX2 8434.391 TCFD.BX2 2767.991 TSCN. BX2 TSCF. BX2 567.113 INND.BX2 2062.081 INFD.BX2 368.048 TENS.BX2 GR.BX2 36.156 CCL.BX2 0.026 DEPT. 4998.000 SIGM. BX2 19.520 TPHI.BX2 27.124 SBHF.BX2 SBHN. BX2 97.753 SIGC. BX2 0.001 SIBH. BX2 122.825 TRAT. BX2 SDSI.BX2 0.671 BACK.BX2 138.251 FBAC.BX2 25.818 TCAN. BX2 TCAF.BX2 4684.906 TCND.BX2 8730.330 TCFD.BX2 3118.948 TSCN. BX2 TSCF. BX2 958.205 INND.BX2 2108.428 INFD.BX2 348.068 TENS.BX2 GR.BX2 38.250 CCL.BX2 0.037 78.897 1.316 6037.234 1148.041 770.000 76. 019 1.456 9273. 328 1896. 676 965. 000 LIS Tape Verification Listing Schlumberger Alaska Computing Center 20-JUN-1996 14:48 PAGE: 42 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .008 SERVICE : FLIC VERSION : O01CO1 DATE : 96/06/20 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .009 SERVICE · FLIC VERSION · O01CO1 DATE : 96/06/20 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER 9 RAW CURVES Curves and log header data for each pass in separate files; raw background pass in last file PASS NUMBER: 3 DEPTH INCREMENT: O. 5000 FILE S~Y VENDOR TOOL CODE START DEPTH STOP DEPTH 5542.0 5397.0 TDTP $ LOG HEADER DATA DATE LOGGED: 09-FEB-96 SOFTWARE VERSION: CP 44.2 TIME LOGGER ON BOTTOM: TD DRILLER (FT) : 5612.0 TD LOGGER (FT) : O. 0 TOP LOG INTERVAL (FT): 3092.0 BOTTOM LOG INTERVAL (FT) : 5629.0 LOGGING SPEED (FPHR): 1800.0 DEPTH CONTROL USED (YES/NO): NO TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE TOOL NUMBER LIS Tape Verification Listing Schlumberger Alaska Computing Center 20-JUN-1996 14:48 PAGE: 43 TDTP THERMAL DECAY EQF1 TDTP THERMAL DECAY CGRS-A-860 TDTP THERMAL DECAY CPSC-A-805 TDTP THERMAL DECAY CPLS-A- 778 TDTP THERMAL DECAY TDIC-A- 816 TDTP THERMAL DECAY TNC- P- C390 TDTP THERMAL DECAY TND- P- C3 9 5 TDTP THERMAL DECAY TNG- P- B4 0 0 TDTP THERMAL DECAY CTSM-A- 60 $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLERS CASING DEPTH (FT) : LOGGERS CASING DEPTH (FT) : 6992.0 BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE TEMPERATURE (DEGF) : BOTTOM HOLE TEMPERATURE (DEGF) : FLUID SALINITY (PPM) : FLUID LEVEL (FT) : FLUID RATE AT WELLHEAD (BPM) : WATER CUTS (PCT) : GAS~OIL RATIO: CHOKE (DEG) : SEAWATER/BORAX NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): THERMAL SANDSTONE 2.65 BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE TOP NORMALIZING WINDOW (FT) : BASE NORMALIZING WINDOW (FT) : BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (CPS): 0 FAR COUNT RATE HIGH SCALE (CPS): 13000 NEAR COUNT RATE LOW SCALE (CPS): 0 NEAR COUNT RATE HIGH SCALE (CPS): 30000 TOOL STANDOFF (IN): REMARKS: TIED INTO BHC (WA) DATED 4/6/88. DID BASELINE TEMP PASS FROM 2000' - TD MADE BASELINE TDT PASS FROM TD TO 3100'. PUMPED 290 BBLS BORAX FOLLOWED BY 310 BBLS OF SEAWATER. PUMPED @ 5-6 BPM WHILE DISPLACING AND LOGGING. CHANNEL APPEARS UP TO ABOUT 5545. THIS FILE CONTAINS BORAX PASS #3. $ LIS FORMAT DATA LIS Tape Verification Listing Schlumberger Alaska Computing Center 20-JUN-1996 14:48 PAGE: 44 TABLE TYPE : CONS T UNI VAL U DEFI CN ARCO ALASKA, INC. Company Name FN PRUDHOE BAY Field Name WN DS 4-19 Well Name APIN 500292179100 API Serial Number FL 0908' FSL & 0255' FWL Field Location SECT 2 6 Se c t i on TOWN 1 IN Township RANG 15E Range COUN NORTH SLOPE County STAT ALASKA State or Province NA TI USA Nat i on WITN M. REYNOLDS Wi tness Name SON 100307 Service Order Number PDA T MSL Permanent datum EPD FT O. Elevation of Permanent Datum LMF RKB Log Measured From APD FT 60. Above Permanent Datum EKB FT 60. Elevation of Kelly Bushing EDF FT 59. Elevation of Derrick Floor EGL FT 21. Elevation of Ground Level TDD FT 5612. Total Depth - Driller BLI FT 5629. Bottom Log Interval TLI FT 3092. Top Log Interval DFT SEAWATER/BORAX Drilling Fluid Type TABLE TYPE : CURV DEFI DEPT SIGM TPHI SBHF SBHN SIGC SIBH TRA T SDSI BACK FBAC TCAN TCAF TCND TCFD TSCN TSCF INND INFD TENS Depth Sigma (Neutron Capture Cross Section) TDT Porosity Borehole Sigma - far detector Borehole Sigma - Near detector Sigma Correction Corrected Borehole Sigma Ration Total Near to Far counts Standard deviation of Sigma Background Count Rates - Near Detector Background Count Rate - Far Detector Total counts analyzed - near detector (TDTP) Total counts analyzed - far detector (TDTP) Total capture counts - Near detector Total capture Counts ~ far dectector Total Selected Counts - Near Detector Total Selected Counts - Far Detector Inelastic count rate - near detector Inelastic count rate - far detector Surface Tension LIS Tape Verification Listing Schlumberger Alaska Computing Center 20-JUN-1996 14:48 PAGE: 45 DEFI GR API-Corrected Gamma Ray CCL CCLAmplitude ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 88 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 11 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERVUNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 100307 O0 000 O0 0 9 1 1 4 68 0000000000 SIGM BX3 CU 100307 O0 000 O0 0 9 1 1 4 68 0000000000 TPHI BX3 PU 100307 O0 000 O0 0 9 1 1 4 68 0000000000 SBHF BX3 CU 100307 O0 000 O0 0 9 1 1 4 68 0000000000 SBHN BX3 CU 100307 O0 000 O0 0 9 1 1 4 68 0000000000 SIGC BX3 CU 100307 O0 000 O0 0 9 1 1 4 68 0000000000 SIBH BX3 CU 100307 O0 000 O0 0 9 1 1 4 68 0000000000 TRAT BX3 100307 O0 000 O0 0 9 1 1 4 68 0000000000 SDSI BX3 CU 100307 O0 000 O0 0 9 1 1 4 68 0000000000 BACK BX3 CPS 100307 O0 000 O0 0 9 1 1 4 68 0000000000 FBAC BX3 CPS 100307 O0 000 O0 0 9 1 1 4 68 0000000000 TCANBX3 CPS 100307 O0 000 O0 0 9 1 1 4 68 0000000000 TCAF BX3 CPS 100307 O0 000 O0 0 9 1 1 4 68 0000000000 TCNDBX3 CPS 100307 O0 000 O0 0 9 1 1 4 68 0000000000 TCFD BX3 CPS 100307 O0 000 O0 0 9 1 1 4 68 0000000000 TSCN BX3 CPS 100307 O0 000 O0 0 9 1 1 4 68 0000000000 TSCF BX3 CPS 100307 O0 000 O0 0 9 1 1 4 68 0000000000 LIS Tape Verification Listing Schlumberger Alaska Computing Center 20-JUN-1996 14:48 PAGE: 46 NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) INND BX3 CPS 100307 O0 000 O0 0 9 1 1 4 68 0000000000 INFD BX3 CPS 100307 O0 000 O0 0 9 1 1 4 68 0000000000 TENS BX3 LB 100307 O0 000 O0 0 9 1 1 4 68 0000000000 GR BX3 GAPI 100307 O0 000 O0 0 9 1 1 4 68 0000000000 CCL BX3 V 100307 O0 000 O0 0 9 1 1 4 68 0000000000 ** DATA ** DEPT. 5631.500 SIGM. BX3 19.520 TPHI.BX3 27.124 SBHF. BX3 SBHN. BX3 97.753 SIGC.BX3 0.001 SIBH.BX3 122.825 TRAT. BX3 SDSI.BX3 0.671 BACK. BX3 138.251 FBAC.BX3 25.818 TCAN. BX3 TCAF. BX3 4684.906 TCND.BX3 8730.330 TCFD.BX3 3118.948 TSCN. BX3 TSCF. BX3 958.205 INND.BX3 2108.428 INFD.BX3 348.068 TENS.BX3 GR.BX3 46.594 CCL.BX3 0.039 DEPT. 5396.500 SIGM. BX3 27.591 TPHI.BX3 25.200 SBHF. BX3 SBHN. BX3 50.832 SIGC. BX3 5.455 SIBH.BX3 50.985 TRAT. BX3 SDSI.BX3 1.050 BACK. BX3 136.086 FBAC.BX3 25.621 TCAN. BX3 TCAF. BX3 9156.877 TCND.BX3 19878.195 TCFD.BX3 5940.607 TSCN. BX3 TSCF. BX3 1013.704 INND.BX3 2303.423 INFD.BX3 385.664 TENS.BX3 GR.BX3 48.750 CCL.BX3 0.039 76. 019 1. 456 9273. 328 1896. 676 845. 000 44.049 1.460 25054.441 2487.311 1000.000 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .009 SERVICE · FLIC VERSION : O01CO1 DATE : 96/06/20 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** TAPE TRAILER **** SERVICE NAME : EDIT DATE : 96/06/20 ORIGIN · FLIC TAPE NAME : 96057 CONTINUATION # : 1 PREVIOUS TAPE : CO~4ENT : ARCO ALASKA INC, D.S. 4-19, PRUDHOE BAY, 50-029-21791-00 LIS Tape Verification Listing Schlumberger Alaska Computing Center 20-JUN-1996 14:48 PAGE: 47 **** REEL TRAILER **** SERVICE NAME : EDIT DATE : 96/06/20 ORIGIN : FLIC REEL NAME : 96057 CONTINUATION # : PREVIOUS REEL : COM~ENT · ARCO ALASKA INC, D.S. 4-19, PRUDHOE BAY, 50-029-21791-00