Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAbout197-0801. Type of Request: Abandon Plug Perforations Fracture Stimulate Repair Well Operations shutdown
Suspend Perforate Other Stimulate Pull Tubing Change Approved Program
Plug for Redrill Perforate New Pool Re-enter Susp Well Alter Casing Other: Suspended Well Renewal
2. Operator Name: 4. Current Well Class: 5. Permit to Drill Number:
Exploratory Development
3. Address:Stratigraphic Service
6. API Number:
7. If perforating:8. Well Name and Number:
What Regulation or Conservation Order governs well spacing in this pool?
Yes No
9. Property Designation (Lease Number): 10. Field:
11.
Total Depth MD (ft): Total Depth TVD (ft): Effective Depth MD: Effective Depth TVD: Junk (MD):
18,310'N/A
Casing Collapse
Conductor N/A
Surface 3,090psi
Intermediate 5,410psi
Packers and SSSV Type: Packers and SSSV MD (ft) and TVD (ft):
12. Attachments: Proposal Summary Wellbore schematic 13. Well Class after proposed work:
Detailed Operations Program BOP Sketch Exploratory Stratigraphic Development Service
14. Estimated Date for 15. Well Status after proposed work:
Commencing Operations: OIL WINJ WDSPL Suspended
16. Verbal Approval: Date: GAS WAG GSTOR SPLUG
AOGCC Representative: GINJ Op Shutdown Abandoned
Contact Name:
Contact Email:
Contact Phone:
Authorized Title: Wells Manager
Conditions of approval: Notify AOGCC so that a representative may witness Sundry Number:
Plug Integrity BOP Test Mechanical Integrity Test Location Clearance
Other Conditions of Approval:
Post Initial Injection MIT Req'd? Yes No
APPROVED BY
Approved by: COMMISSIONER THE AOGCC Date:
Comm. Comm. Sr Pet Eng Sr Pet Geo Sr Res Eng
Ryan Thompson
ryan.thompson@hilcorp.com
907-564-5280
Perforation Depth MD (ft):
See Schematic See Schematic 4-1/2'
S-3 and N/A 17,479 MD/ 6,411 TVD
9,779'
18,287'
112' 20"
9-5/8"
7"
9,779'
18,287'
12.6# / L-80 / IBT
TVD Burst
17,514'
MD
N/A
5,750psi
7,240psi
4,442'
7,088'
C.O. 816
Length Size
Proposed Pools:
112' 112'
8/5/2025
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
APPLICATION FOR SUNDRY APPROVALS
20 AAC 25.280
ADL0025514
197-080
3800 Centerpoint Dr, Suite 1400 Anchorage, AK 99503 50-029-22766-00-00
Hilcorp Alaska LLC
Plugs (MD):
17. I hereby certify that the foregoing is true and the procedure approved herein will not be deviated from without prior written approval.
Authorized Name and
Digital Signature with Date:
Tubing Size:
PRESENT WELL CONDITION SUMMARY
AOGCC USE ONLY
7,109' 18,202' 7,014' N/A 17,494 & 18,805
Subsequent Form Required:
Suspension Expiration Date:
Tubing Grade: Tubing MD (ft):Perforation Depth TVD (ft):
2-7/8" 6.5# / L-80 / IBT 2,599'
MILNE PT UNIT L-34
MILNE POINT KUPARUK RIVER OIL N/A
Will perfs require a spacing exception due to property boundaries?
Current Pools:
MPSP (psi):
Form 10-403 Revised 06/2023 Approved application valid for 12 months from date of approval.Submit PDF to aogcc.permitting@alaska.gov
By Grace Christianson at 2:22 pm, Jul 28, 2025
Digitally signed by Taylor
Wellman (2143)
DN: cn=Taylor Wellman (2143)
Date: 2025.07.28 14:13:14 -
08'00'
Taylor Wellman
(2143)
325-446
October 1, 2027
10-403 for operational
or abandonment plan within 24 months.
* Approved for 2 year suspension renewal.
DSR-8/13/25A.Dewhurst 30JUL25
MGR07AUG25
RBDMS JSB 081825
Hilcorp Alaska, LLC
Taylor Wellman, MPU Wells Manager
3800 Centerpoint Dr, Suite 1400
Anchorage, Alaska 99503
July 23, 2025
Commissioners Jessie Chmielowski & Greg Wilson
Alaska Oil and Gas Conservation Commission
333 West 7th Avenue
Anchorage, Alaska 99501
Subject: MPU Well MPL-34 (PTD# 1970800)
Application for Renewal of Suspension (10-403)
Dear Commissioners,
An AOGCC witnessed suspended well inspection of MPU well MPL-34 was conducted on
06/09/25 (20 AAC 25.110 (h)). The submitted suspended well inspection reflects the current
condition of the well (reference 20 AAC 25.110 (f)) and supports the request for renewal of
suspension. Recent events from this well indicate that this well is mechanically sound. Specific
attachments include:
Suspended Well Site Inspection form documenting the pressures and site condition.
Wellbore diagram illustrating the current configuration of the well.
MPU well MPL-34 was suspended on 12/01/2008 and has future utility bringing the well back on
injection with a RWO and the drilling of a new offset producer. The strata through which the well
was drilled is neither abnormally geopressured nor depleted. The well is mechanically sound,
passing a pressure test of the 7” casing to 3500 psi on 12/2/2008 against the CIBP set at
17,494’ in the tubing tail. A subsequent test of the 7” casing was performed on 6/6/25 to 1500
psi and passed. FL’s were shot prior to the CMIT and were at surface indicating no gas
migration in the wellbore. The purpose of the recent CMIT was to verify barriers following an
increasing pressure trend on the IA of ~160 psi/year. Based on these conditions and the
inspection on 06/09/25, MPL-34 meets the provisions required in 20 AAC 25.110 (a)(1).
Hilcorp Alaska, LLC requests a variance to 20 AAC 25.110 (c) and requests approval for
renewal of the existing suspension status for this well for a 2 year period (Expiration 10/1/2027)
in its current condition with no cement across the perforations in order to maintain reservoir
access for a future return to injection in the existing perforations with RWO. CTD sidetrack
candidates in this fault block are currently being evaluated for drilling targets. Due to the
observed 160 psi/year IA pressure increase, SCADA alarms will be established on the IA at
1000 psi. Attached is an Application for Sundry Approval (10-403) with a technical justification
summarizing the information on the current status and condition of the well (reference 20 AAC
25.110 (a), (b), (e), (h)).
In summary, Hilcorp believes MPU well MPL-34 is mechanically sound and secure.
If you have any questions, please call me at 907-777-8449 or Ryan Thompson at 907-564-
5005.
Sincerely,
Taylor Wellman
MPU Wells Manager
Attachments
Technical Justification
2025 Suspended Well Site Inspection Form
Wellbore Schematic
MPU Well MPL-34 (PTD #1970800)
Technical Justification for Renewal of Suspended Status
7/23/2025
Well History and Status
MPU well MPL-34 was drilled as a grassroots WAG well in 1997. In 2008 it was determined the
well no longer supported any offset production and a RWO was performed to suspend the well,
setting a CIBP, pulling tubing and running a 2 7/8” kill string to 2599’ suspending the well on
12/1/2008. A 3500 psi MIT of the 7” casing against the CIBP & packer passed on 12/2/2008. In
June 2025 a MIT of the 7” casing passed to 1500 psi to verify continued competency of the 7”
casing, CIBP & packer following recognition of a 160 psi/year IA pressure increase.
The well has future utility as a candidate to return to injection via RWO to support future offset
development drilling. MPL-34 will not allow the migration of fluids, will not damage freshwater or
producing or potentially producing formations, will not impair the recovery of oil or gas, and is
secure, safe and not a threat to public health. The strata through which the well was drilled is
neither abnormally geo-pressured or depleted.
Condition of the Wellhead and Surface Location
MPL-34 is located on an active, well maintained pad with clean gravel. The pit and surrounding
area are in good condition. There is no discoloration and no sheens on the pad, pits, or in
nearby water.
The well pressure readings are T/I/O = 180/180/100 psi.
Request
Hilcorp Alaska, LLC requests approval for renewal of the existing suspension status for 2 years
for MPL-34.
A variance to the provisions of 20 AAC 25.112 (c) and 20 AAC 25.110 (c) is also requested
under 20 AAC 25.112 (i) to allow the well to remain as suspended in its current condition to
allow for full evaluation of a return to injection via RWO to support planned drilling of an offset
producer.
steve.soroka@hilcorp.com
Yes
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
PLB 12/2014 MPL-34 Suspended Well Inspection Form 2025.xls
DATE REV. BY COMMENTS
Orig. KB Elev. = 52.88' (N 27E)
Orig. GL Elev. = 17.10'
RT To Tbg. Spool = 35.7' (N 27E)
MILNE POINT UNIT
WELL L-34
API No: 50-029-22766
9 5/8", 40#/ft, L-80 Btrc.
Perforation Summary
Ref log: 5/22/97 LWD
Size SPF Interval (TVD)
Hilcorp Alaska LLC
7" float collar (PBTD)
KOP @ 1000'
Max. hole angle = 81 deg. @ 6,470’
79 deg. to 81 deg. (4,100’ - 14,700’)
Hole angle thru' perfs = > 31 deg.
7" float shoe
20" 91.1 ppf, H-40
51b HJ11 Deep penetrating charges
@ 60 deg. phasing
112'
Stimulation Summary
7" 26 ppf, L-80, NSCC casing
( drift ID = 6.151“, cap. = 0.0383 bpf )
MPU L-34i
9,779’
18,287’
18,202’
5 - 31 -97 MDO Drilled and cased by Nabors 27E
Tree: 4 1/8" - 5M CIW Dry Hole
Wellhead: 11" 5M FMC Gen. 5 w/
11" x 4.5" FMC Tbg. Hgr. , 4.5"
NSCT threads top and bottom, 4"
CIW "H" BPV profile
4.5” 5 17,906’-17,926’ 6,775’-6,791’
4.5” 5 17,930’-17,970’ 6,794’-6,829’
4.5” 5 18,004’-18,024’ 6,858’-6,876’
Initial perforations
WLEG
4.5” HES XN-Nipple ( 3.725”id )
7”x 4.5” Baker S-3 Perm pkr.
17,514’
17,502’
17,479’
4.5” 12.6 ppf, L-80, IBT Tubing
( drift ID = 3.958”, cap.= .0152 bpf )
11/22/97 MDO Completion Nabors 5 S
2-7/8”
2-7/8”
4
4
17,840’-17,860’
17,868’-17,878’
Shot with coil 1/15/01
E-Line:
Coil:
2-7/8” power jet, 4SPF, 60 degree, EHD=.36
TTP= 27.7
1/15/01 M. Linder Add perfs using Coil.
11/22/08 REH Set CIBP and Cut TBG/ CTU #9
4.5“ Baker CIBP 17,494mid element
Jet cut 4 1/2“ tbg top 11/22/08 17,449’
2 7/8” HES XN-Nipple
(2.250” No-Go ID)2555’
WLEG 2599’
2 7/8” 6.5 ppf, L-80, IBT Tubing
( drift ID = 2.347”, cap.= .0059 bpf )
2 7/8” Kill String
Casing tested against CIBP
to 3500 psi 12/2/08
12/3/08 L. Hulme Pull 4 1/2“ Tbg and set 2 7/8” kill string
TOC @ 17,150':CBL 7/4/1997
CAUTION: This email originated from outside the State of Alaska mail system. Do not
click links or open attachments unless you recognize the sender and know the content
is safe.
From:Wallace, Chris D (OGC)
To:AOGCC Records (CED sponsored)
Subject:FW: MPL-34 (PTD# 1970800) - Suspended Well Renewal
Date:Friday, July 18, 2025 10:17:48 AM
Attachments:MPL-34 Suspended Well Renewal July 2025.docx
From: Ryan Thompson <ryan.thompson@hilcorp.com>
Sent: Thursday, July 17, 2025 4:12 PM
To: Roby, David S (OGC) <dave.roby@alaska.gov>
Cc: Taylor Wellman <twellman@hilcorp.com>; Rixse, Melvin G (OGC) <melvin.rixse@alaska.gov>;
Wallace, Chris D (OGC) <chris.wallace@alaska.gov>
Subject: MPL-34 (PTD# 1970800) - Suspended Well Renewal
Mr. Roby,
MPL-34 is due for suspended well renewal on 10/1/2025, we plan to submit the following
renewal document by 8/1/25.
Last month Hilcorp staff met with AOGCC to discuss the options of leaving this well in
suspended status for an additional two year period with the reservoir uncemented and
the wellbore secured with a CIBP in the tubing tail. This well has seen a ~160 psi/year
pressure build up in the IA. We conducted an additional CMIT-TxI in June, after notifying
AOGCC of the pressure build up, which passed, confirming the current barrier status of
the well. Hilcorp is currently evaluating CTD producer sidetracks in this fault block and
would like to retain reservoir access for this well for future injection support.
At the conclusion of the meeting there was general consensus for continuing in
suspended status in the current mechanical state with the following stipulations:
1. Hilcorp would request a variance to 20 AAC 25.110 (c), and place a 2 year time
limit on the extension renewal (ie either return the well to injection or perform
reservoir abandonment by 10/1/27.
2. Hilcorp would place SCADA alarms on the IA and monitor for any change in
annular pressure build up.
The highlighted paragraph of the attached word document intends to summarize these
stipulations.
If you can please provide any feedback or guidance you have to this proposed
suspension renewal.
Thank you,
Ryan Thompson
Milne / Islands / WNS Well Integrity Engineer
907-564-5005
The information contained in this email message is confidential and may be legally privileged and is intended only for the use of theindividual or entity named above. If you are not an intended recipient or if you have received this message in error, you are herebynotified that any dissemination, distribution, or copy of this email is strictly prohibited. If you have received this email in error, pleaseimmediately notify us by return email or telephone if the sender's phone number is listed above, then promptly and permanently deletethis message.
While all reasonable care has been taken to avoid the transmission of viruses, it is the responsibility of the recipient to ensure that theonward transmission, opening, or use of this message and any attachments will not adversely affect its systems or data. No responsibilityis accepted by the company in this regard and the recipient should carry out such virus and other checks as it considers appropriate.
Hilcorp Alaska, LLC
Taylor Wellman, MPU Wells Manager
3800 Centerpoint Dr, Suite 1400
Anchorage, Alaska 99503
July 17, 2025
Commissioners Jessie Chmielowski & Greg Wilson
Alaska Oil and Gas Conservation Commission
333 West 7th Avenue
Anchorage, Alaska 99501
Subject: MPU Well MPL-34 (PTD# 1970800)
Application for Renewal of Suspension (10-403)
Dear Commissioners,
An AOGCC witnessed suspended well inspection of MPU well MPL-34 was conducted on
06/09/25 (20 AAC 25.110 (h)). The submitted suspended well inspection reflects the current
condition of the well (reference 20 AAC 25.110 (f)) and supports the request for renewal of
suspension. Recent events from this well indicate that this well is mechanically sound. Specific
attachments include:
• Suspended Well Site Inspection form documenting the pressures and site condition.
• Wellbore diagram illustrating the current configuration of the well.
MPU well MPL-34 was suspended on 12/01/2008 and has future utility bringing the well back on
injection with a RWO and the drilling of a new offset producer. The strata through which the well
was drilled is neither abnormally geopressured nor depleted. The well is mechanically sound,
passing a pressure test of the 7” casing to 3500 psi on 12/2/2008 against the CIBP set at
17,494’ in the tubing tail. A subsequent test of the 7” casing was performed on 6/6/25 to 1500
psi and passed. FL’s were shot prior to the CMIT and were at surface indicating no gas
migration in the wellbore. The purpose of the recent CMIT was to verify barriers following an
increasing pressure trend on the IA of ~160 psi/year. Based on these conditions and the
inspection on 06/09/25, MPL-34 meets the provisions required in 20 AAC 25.110 (a)(1).
Hilcorp Alaska, LLC requests a variance to 20 AAC 25.110 (c) and requests approval for
renewal of the existing suspension status for this well for a 2 year period (Expiration 10/1/2027)
in its current condition with no cement across the perforations in order to maintain reservoir
access for a future return to injection in the existing perforations with RWO. CTD sidetrack
candidates in this fault block are currently being evaluated for drilling targets. Due to the
observed 160 psi/year IA pressure increase, SCADA alarms will be established on the IA at
1000 psi. Attached is an Application for Sundry Approval (10-403) with a technical justification
summarizing the information on the current status and condition of the well (reference 20 AAC
25.110 (a), (b), (e), (h)).
In summary, Hilcorp believes MPU well MPL-34 is mechanically sound and secure.
If you have any questions, please call me at 907-777-8449 or Ryan Thompson at 907-564-
5005.
Sincerely,
Taylor Wellman
MPU Wells Manager
Attachments
Technical Justification
2025 Suspended Well Site Inspection Form
Wellbore Schematic
MPU Well MPL-34 (PTD #1970800)
Technical Justification for Renewal of Suspended Status
7/17/2025
Well History and Status
MPU well MPL-34 was drilled as a grassroots WAG well in 1997. In 2008 it was determined the
well no longer supported any offset production and a RWO was performed to suspend the well,
setting a CIBP, pulling tubing and running a 2 7/8” kill string to 2599’ suspending the well on
12/1/2008. A 3500 psi MIT of the 7” casing against the CIBP & packer passed on 12/2/2008. In
June 2025 a MIT of the 7” casing passed to 1500 psi to verify continued competency of the 7”
casing, CIBP & packer following recognition of a 160 psi/year IA pressure increase.
The well has future utility as a candidate to return to injection via RWO to support future offset
development drilling. MPL-34 will not allow the migration of fluids, will not damage freshwater or
producing or potentially producing formations, will not impair the recovery of oil or gas, and is
secure, safe and not a threat to public health. The strata through which the well was drilled is
neither abnormally geo-pressured or depleted.
Condition of the Wellhead and Surface Location
MPL-34 is located on an active, well maintained pad with clean gravel. The pit and surrounding
area are in good condition. There is no discoloration and no sheens on the pad, pits, or in
nearby water.
The well pressure readings are T/I/O = 180/180/100 psi.
Request
Hilcorp Alaska, LLC requests approval for renewal of the existing suspension status for 2 years
for MPL-34.
A variance to the provisions of 20 AAC 25.112 (c) and 20 AAC 25.110 (c) is also requested
under 20 AAC 25.112 (i) to allow the well to remain as suspended in its current condition to
allow for full evaluation of a return to injection via RWO to support planned drilling of an offset
producer.
Suspended Well Inspection Review Report Reviewed By:
P.I. Suprv
Comm ________
JBR 07/25/2025
InspectNo:susKPS250609144817
Well Pressures (psi):
Date Inspected:6/9/2025
Inspector:Kam StJohn
If Verified, How?Other (specify in comments)
Suspension Date:12/1/2008
#304-400
Tubing:180
IA:180
OA:100
Operator:Hilcorp Alaska, LLC
Operator Rep:Steve Soroka
Date AOGCC Notified:5/28/2025
Type of Inspection:Subsequent
Well Name:MILNE PT UNIT L-34
Permit Number:1970800
Wellhead Condition
No visable leaks on wellhead, all valves operational all guages worked.
Surrounding Surface Condition
Well house looked ok flowlines disconnected.
Condition of Cellar
No standing water or sheen. Small amount of ice in cellar
Comments
Location verified per pad map
Supervisor Comments
Photos (5)
Suspension Approval:Sundry
Location Verified?
Offshore?
Fluid in Cellar?
Wellbore Diagram Avail?
Photos Taken?
VR Plug(s) Installed?
BPV Installed?
Friday, July 25, 2025
2025-0609_Suspend_MPU_L-34_photos_ksj
Page 1 of 3
Suspended Well Inspection – Milne Point Unit L-34
PTD 1970800
AOGCC Inspection Rpt # susKPS250609144817
Photos by AOGCC Inspector K. StJohn
6/9/2025
2025-0609_Suspend_MPU_L-34_photos_ksj
Page 2 of 3
2025-0609_Suspend_MPU_L-34_photos_ksj
Page 3 of 3
CAUTION: This email originated from outside the State of Alaska mail system. Do not
click links or open attachments unless you recognize the sender and know the content
is safe.
From:Rixse, Melvin G (OGC)
To:AOGCC Records (CED sponsored)
Subject:20250604 1447 Suspended Well MPL-34 (PTD# 1970800) - IA pressurization
Date:Thursday, June 5, 2025 2:41:56 PM
Attachments:MPL-34 1 year TIO.docx
MPL-34 schematic.pdf
From: Ryan Thompson <Ryan.Thompson@hilcorp.com>
Sent: Wednesday, June 4, 2025 2:47 PM
To: Rixse, Melvin G (OGC) <melvin.rixse@alaska.gov>; Wallace, Chris D (OGC)
<chris.wallace@alaska.gov>
Cc: Alaska NS - Wells Integrity <AKNSWellsIntegrity@hilcorp.com>
Subject: Suspended Well MPL-34 (PTD# 1970800) - IA pressurization
Mel,
We are starting to work the MPL-34 (PTD# 1970800) suspended well renewal due 8/1/25,
in reviewing the TIO’s for the well there is an increasing pressure trend on the IA, having
gained 160 psi in the last year and currently sitting at 1020 psi.
The well was suspended in 2008 with a CIBP set in the tubing tail and a kill string
installed. A suspended well inspection is planned for June 2025, pending the snow
melting at MPU.
Our plan forward is to:
1. Verify FL’s.
2. Perform a CMIT-TxIA to 1500 psi.
The WBS and TIO plot for the last year is attached.
I will follow up this email when we have results on the CMIT and will submit a non-
witnessed 10-426 form.
Please let me know if you have any questions.
Thanks,
Ryan Thompson
Milne / Islands / WNS Well Integrity Engineer
907-564-5005
The information contained in this email message is confidential and may be legally privileged and is intended only for the use of theindividual or entity named above. If you are not an intended recipient or if you have received this message in error, you are herebynotified that any dissemination, distribution, or copy of this email is strictly prohibited. If you have received this email in error, please
immediately notify us by return email or telephone if the sender's phone number is listed above, then promptly and permanently delete
this message.
While all reasonable care has been taken to avoid the transmission of viruses, it is the responsibility of the recipient to ensure that theonward transmission, opening, or use of this message and any attachments will not adversely affect its systems or data. No responsibilityis accepted by the company in this regard and the recipient should carry out such virus and other checks as it considers appropriate.
DATE REV. BY COMMENTS
Orig. KB Elev. = 52.88' (N 27E)
Orig. GL Elev. = 17.10'
RT To Tbg. Spool = 35.7' (N 27E)
MILNE POINT UNIT
WELL L-34
API No: 50-029-22766
9 5/8", 40#/ft, L-80 Btrc.
Perforation Summary
Ref log: 5/22/97 LWD
Size SPF Interval (TVD)
BP EXPLORATION (AK)
7" float collar (PBTD)
KOP @ 1000'
Max. hole angle = 81 deg. @ 6,470’
79 deg. to 81 deg. (4,100’ - 14,700’)
Hole angle thru' perfs = > 31 deg.
7" float shoe
20" 91.1 ppf, H-40
51b HJ11 Deep penetrating charges
@ 60 deg. phasing
112'
Stimulation Summary
7" 26 ppf, L-80, NSCC casing
( drift ID = 6.151“, cap. = 0.0383 bpf )
MPU L-34i
9,779’
18,287’
18,202’
5 - 31 -97 MDO Drilled and cased by Nabors 27E
Tree: 4 1/8" - 5M CIW Dry Hole
Wellhead: 11" 5M FMC Gen. 5 w/
11" x 4.5" FMC Tbg. Hgr. , 4.5"
NSCT threads top and bottom, 4"
CIW "H" BPV profile
4.5” 5 17,906’-17,926’ 6,775’-6,791’
4.5” 5 17,930’-17,970’ 6,794’-6,829’
4.5” 5 18,004’-18,024’ 6,858’-6,876’
Initial perforations
WLEG
4.5” HES XN-Nipple ( 3.725”id )
7”x 4.5” Baker S-3 Perm pkr.
17,514’
17,502’
17,479’
4.5” 12.6 ppf, L-80, IBT Tubing
( drift ID = 3.958”, cap.= .0152 bpf )
11/22/97 MDO Completion Nabors 5 S
2-7/8”
2-7/8”
4
4
17,840’-17,860’
17,868’-17,878’
Shot with coil 1/15/01
E-Line:
Coil:
2-7/8” power jet, 4SPF, 60 degree, EHD=.36
TTP= 27.7
1/15/01 M. Linder Add perfs using Coil.
11/22/08 REH Set CIBP and Cut TBG/ CTU #9
4.5“ Baker CIBP 17,494mid element
Jet cut 4 1/2“ tbg top 11/22/08 17,449’
2 7/8” HES XN-Nipple
(2.250” No-Go ID)2555’
WLEG 2599’
2 7/8” 6.5 ppf, L-80, IBT Tubing
( drift ID = 2.347”, cap.= .0059 bpf )
2 7/8” Kill String
Casing tested against CIBP
to 3500 psi 12/2/08
12/3/08 L. Hulme Pull 4 1/2“ Tbg and set 2 7/8” kill string
State of Alaska
Oil and Gas Conservation Commission
Deficiency Report
Location: Milne Point Unit Date:
7/23/2020
PTD: Various
Operator: Hilcorp North Slope Type Inspection:
Suspend
Operator Rep: Derek Weglln Inspector:
Jim Regg
Position: Wellsite Supervisor
Op. Phone: 907-670-3387 Correct by (date):
8/15/2020
Op. Email: Derek.Weglin@hilcorp.com Follow Up Req'd:
yes
Detailed Description of Deficiencies
Date Corrected
Missing API # on Well Sign: MPU C-16 (PTD 1851100)
7-24-2020
Missing API # on Well Sign: MPU K-25 (PTD 1960320)
i 7-24-2020
Missing API # on Well Sign: MPU L-34 (PTD 1970800)
7-25-2020'
Missing API # on Well Sign: MPU L-35A (PTD 2011900)
7-25-2020
Attachments:
Photos (4) Note Jeff Jones waived reinspection on 7-25-20
Derek Weglin °e""°'a"`°' r "'",""
4625 u=U> 0N. "-o.,.kw�"<�s.
Operator Rep LX
Signatures:
Digitally signed by James B. Regg
James B.. Regg
AOGCC Inspector
Date: 2020.07.2310:56:05-08'00'
*After signing, a copy of this form is to be left with the operator.
Follow-up Instructions
Return a copy of this Deficiency Report to AOGCC (Attention: Inspection Supervisor) within 7 days of receipt. Include the "Date
Corrected" and attach supporting documentation for each corrective action implemented to address the
deficiencies. If a follow-
up inspection was performed by AOGCC, include the date and name of Inspector. Extensions for corrective
actions taking longer
thanthe "correct by" date must be requested and accompanied byjustification (Attention: Inspection
Supervisor).
Documentation of deficiences that are outside of AOGCC regulatory jurisdiction will be forwarded to the appropriate authority
Revised 7/2019
MPU Well Signs Corrected (Missing API #)
Response to AOGCC Deficiency Report Issued 7/23/2020
Photos Courtesy of Hilcorp
7/24/2020
WELL NAME MPC•16
OWNER Ailne Point Unit
*OPERATOR HILCOHP Alaska, CM �
SUR. LOCATION S 1/4, Sec. 10, T13N, R10E
DRILLING PERMIT 165-110
API# 50-029-21364-00-00
e
WELL NAME MPKw25
" OWNER Milne Pint Unit
OPERATOR HILCORP Alaska, LLC
SUR. LOCATION NE 1/4, Sec. 03, T12N, R11E
DRILLING PERMIT 196-032
API# 50-029-22650-00-00
2020-0725_Deficiency_Re po rt_Co rrected_M P U_W e I Isigns_photos.docx
Page 1 of 2
0
WELL NAME MPL-341
OWNER Milne Point Unit
OPERATOR HILCORP Alaska, LLC
SUR. LOCATION NW 1/4, Sec.08, T13N, R10E
DRILLING PERMIT 97-80
AP1# 50-029-22766-00-00
a.
Te
TRI NAME MPLw35A
OWNER w Milne Point Unit
S t
OPERATOR HILCORP Alaska, LLC
SUR. LOCATION NW 1/4, Sec. 08, T13N, R10E
DRILLING PERMIT 201-109
AP1# 50-029-22768-01-00
2020-0725_Deficiency_Re port_Co rrected_M P U_W e I Isigns_photos.docx
Page 2 of 2
Regg, James B (CED)
From: Regg, James B (CED)
Sent: Thursday, July 23, 2020 11:54 AM
To: Chad Helgeson c
Cc: Roby, David 5 (CED)
Subject: MPU Well Signs
Attachments: 2020-0723_Deficiency_Report_MPU _wellsigns.pdf; MPU L-34 well signjpg; MPU L -35A
well signjpg; MPU C-16 well signjpg; MPU K-25 well signjpg
AOGCC performed suspended well inspections at several MPU wells in late June and recently received the suspended
well 10-404s from Hilcorp. 4 wells had identification signs that were missing the API number. Attached is a Deficiency
Notice requesting these signs be adjusted to include the API #; the due date can be amended if needed. Hilcorp is
encouraged to confirm that the other wells in MPU have the correct info on the well signs. Call or email if you have
questions.
Jim Regg
Supervisor, Inspections
AOGCC
333 W.7th Ave, Suite 100
Anchorage, AK 99501
907-793-1236
CONFIDENTIALITY NOTICE: This e-mail message, including any attachments, contains information from the Alaska Oil and Gas Conservation
Commission (AOGCC), State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged information.
The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an unintended recipient of this e-mail,
please delete it, without first saving or forwarding it, and, so that the AOGCC is aware of the mistake in sending it to you, contact Jim Regg at 907-
793-1236 or l im.rear;@alaska.gov.
State of Alaska
Oil and Gas Conservation Commission
Deficiency Report
Location: Milne Point Unit Date: 7/23/2020
PTD: Various
Operator: Hilcorp North Slope Type Inspection: Suspend
Operator Rep: Inspector: Jim Regg
Position:
Op.Phone: Correct by (date): 8/15/2020
Op. Email: Follow Up Req'd: Yes
Detailed Description of Deficiencies
Date Corrected
Missing API # on Well Sign: MPU C-16 (PTD 1851100) ,
Missing API # on Well Sign: MPU K-25 (PTD 1960320)
Missing API # on Well Sign: MPU L-34 (PTD 1970800)
Missing API # on Well Sign: MPU L -35A (PTD 2011900)
Attachments:
Photos (4)
Operator Rep
Signatures:
Digitally signed by James B. Regg
James B. Regg
Date: 2020.07.2310:56:05-08'00' AOGCC Inspector
*Aker signing, a copy of this form is to be left with the operator.
Follow-up Instructions
Return a copy of this Deficiency Report to AOGCC (Attention: Inspection Supervisor) within 7 days of receipt. Include the "Date
Corrected" and attach supporting documentation for each corrective action implemented to address the deficiencies. If a follow-
up inspection was performed by AOGCC, include the date and name of Inspector. Extensions for corrective actions taking longer
than the "correct by" date must be requested and accompanied byjustification (Attention: Inspection Supervisor).
Documentation of deficiences that are outside of AOGCC regulatory jurisdiction will be forwarded to the appropriate authority
Revised 7/2019
al;
I
C
bq
N
>N
C
O
a
Q
m
N
�n N
O
I N
� N
a �
� a
1. Operations Abandon Plug Perforations Fracture Stimulate Pull Tubing Operations shutdown
Performed: Suspend Perforate Other Stimulate Alter Casing Change Approved Program
Plug for Redrill Perforate New Pool Repair Well Re-enter Susp Well Other: Inspect well
Hilcorp Alaska Development Exploratory
Stratigraphic Service 6. API Number:
7. Property Designation (Lease Number): 8. Well Name and Number:
9. Logs (List logs and submit electronic data per 20AAC25.071): 10. Field/Pool(s):
11. Present Well Condition Summary:
Total Depth measured 18,310 feet 17,494 feet
true vertical 7,108 feet N/A feet
Effective Depth measured 18,202 feet 17,479 feet
true vertical 7,014 feet 6,411 feet
Perforation depth Measured depth feet
True Vertical depth feet
2-7/8" 6.5# / L-80 2,599' 2,529'
Tubing (size, grade, measured and true vertical depth)4-1/2" 12.6# / L-80 17,514' 6,439'
Packers and SSSV (type, measured and true vertical depth)N/A N/A
12. Stimulation or cement squeeze summary: N/A
Intervals treated (measured):
Treatment descriptions including volumes used and final pressure: N/A
13.
Prior to well operation:
Subsequent to operation:
15. Well Class after work:
Daily Report of Well Operations Exploratory Development Service Stratigraphic
Copies of Logs and Surveys Run 16. Well Status after work: Oil Gas WDSPL
Electronic Fracture Stimulation Data GSTOR GINJ SUSP SPLUG
Sundry Number or N/A if C.O. Exempt:
Chad Helgeson
Contact Name:
Authorized Title:Operations Manager
Contact Email:
Contact Phone:777-8333
7,088'
See attached schematic
See attached schematic
17,479' MD
6,408' TVD
2. Operator Name
Senior Engineer: Senior Res. Engineer:
Collapse
S-3 Packer and
N/A
4,442'
112'
Burst
3,090psi
20"
5,410psi18,287'
9,779'
112'
9,779'
18,287'
Surface
Intermediate
9-5/8"
7'
5,750psi
7,240psi
N/A
Production
Production
Casing
Conductor
Liner
Length
112'
MILNE PT UNIT L-34
14. Attachments (required per 20 AAC 25.070, 25.071, & 25.283)
Gas-Mcf Casing Pressure Tubing Pressure
N/A
measured
17. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Authorized Signature with date:
Authorized Name:
David Gorm
dgorm@hilcorp.com
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
REPORT OF SUNDRY WELL OPERATIONS
197-080
50-029-22766-00-00
Plugs
ADL0025514
5. Permit to Drill Number:
MILNE POINT / KUPARUK RIVER OIL
Junk measured
3800 Centerpoint Dr, Suite 1400
Anchorage, AK 99503
3. Address:
4. Well Class Before Work:
Representative Daily Average Production or Injection Data
Oil-Bbl
measured
true vertical
Packer
WDSP2 WAG
Water-Bbl
MD TVDSize
PL
G
Form 10-404 Revised 3/2020 Submit Within 30 days of Operations
By Jody Colombie at 8:04 pm, Jul 21, 2020
Chad A Helgeson
2020.07.21
16:38:02 -08'00'
SFD 7/22/2020
RBDMS HEW 7/23/2020
MGR22JUL2020 DSR-7/22/2020 SFD 7/22/2020
, ADL 0025515, ADL0025509
Matt Herrera
DATE REV. BY COMMENTS
Orig. KB Elev. = 52.88' (N 27E)
Orig. GL Elev. = 17.10'
RT To Tbg. Spool = 35.7' (N 27E)
MILNE POINT UNIT
WELL L-34
API No: 50-029-22766
9 5/8", 40#/ft, L-80 Btrc.
Perforation Summary
Ref log: 5/22/97 LWD
Size SPF Interval (TVD)
BP EXPLORATION (AK)
7" float collar (PBTD)
KOP @ 1000'
Max. hole angle = 81 deg. @ 6,470’
79 deg. to 81 deg. (4,100’ - 14,700’)
Hole angle thru' perfs = > 31 deg.
7" float shoe
20" 91.1 ppf, H-40
51b HJ11 Deep penetrating charges
@ 60 deg. phasing
112'
Stimulation Summary
7" 26 ppf, L-80, NSCC casing
( drift ID = 6.151“, cap. = 0.0383 bpf )
MPU L-34i
9,779’
18,287’
18,202’
5 - 31 -97 MDO Drilled and cased by Nabors 27E
Tree: 4 1/8" - 5M CIW Dry Hole
Wellhead: 11" 5M FMC Gen. 5 w/
11" x 4.5" FMC Tbg. Hgr. , 4.5"
NSCT threads top and bottom, 4"
CIW "H" BPV profile
4.5” 5 17,906’-17,926’ 6,775’-6,791’
4.5” 5 17,930’-17,970’ 6,794’-6,829’
4.5” 5 18,004’-18,024’ 6,858’-6,876’
Initial perforations
WLEG
4.5” HES XN-Nipple ( 3.725”id )
7”x 4.5” Baker S-3 Perm pkr.
17,514’
17,502’
17,479’
4.5” 12.6 ppf, L-80, IBT Tubing
( drift ID = 3.958”, cap.= .0152 bpf )
11/22/97 MDO Completion Nabors 5 S
2-7/8”
2-7/8”
4
4
17,840’-17,860’
17,868’-17,878’
Shot with coil 1/15/01
E-Line:
Coil:
2-7/8” power jet, 4SPF, 60 degree, EHD=.36
TTP= 27.7
1/15/01 M. Linder Add perfs using Coil.
11/22/08 REH Set CIBP and Cut TBG/ CTU #9
4.5“ Baker CIBP 17,494mid element
Jet cut 4 1/2“ tbg top 11/22/08 17,449’
2 7/8” HES XN-Nipple
(2.250” No-Go ID)2555’
WLEG 2599’
2 7/8” 6.5 ppf, L-80, IBT Tubing
( drift ID = 2.347”, cap.= .0059 bpf )
2 7/8” Kill String
Casing tested against CIBP
to 3500 psi 12/2/08
12/3/08 L. Hulme Pull 4 1/2“ Tbg and set 2 7/8” kill string
L-34
Suspended Well Inspection Review Report
InspectNo: susMFH200620150638
Date Inspected: 6/20/2020
Inspector: Matt Herrera Type of Inspection:
Well Name:
MILNE PT UNIT L-34
Permit Number:
1970800
Suspension Approval:
Sundry
Suspension Date:
12/1/2008
Location Verified?
W I
4 308-400 -
If Verified, How? Other (specify in comments)
Offshore? ❑
Subsequent
Date AOGCC Notified: 6/19/2020
Operator: Hilcorp Alaska, LLC
Operator Rep: Josh McNeal
Wellbore Diagram Avail?
Photos Taken?
Well Pressures (psi): Tubing:
480
Fluid in Cellar?
❑
IA:
300 -
BPV Installed?
❑
OA:
1501
VR Plug(s) Installed?
❑
Wellhead Condition
Good. No leaks on any flange connections or lock down screws. No SSV. All Valves operational. Gauges installed and in
working order to note tubing and annulus pressures. Issue on well bottom at Braden Head. WSDP disconnected from tree.
Condition of Cellar
Braden Head leaking Blue Goo Repair paste from cement top job repairs. Remainder of cellar clean no standing water or
sheen or subsidence
Surrounding Surface Condition
Good. Wellhouse still over well with flowlines disconnected. Surrounding area clean with no standing water, stains or
subsidence
Comments
Well location verified per MPU L -Pad Location Map. Operator notified to clean cellar and tree of excess Blue Goo repair
paste.
Supervisor Comments
Photos (2) attached, including photo from Pad Operator showing removed excess Blue Goo from cellar and tree.
Q'D
Thursday, July 23, 2020
.4., OF Ty • .
0. \�\I%%%s THE STATE Alaska Oil and Gas
of/` LAsKA Conservation Commission
" fz -= 333 West Seventh Avenue
GOVERNOR BILL WALKER Anchorage, Alaska 99501-3572
1116Z*4, Main: 907.279.1433
O� 4LASy°� Fax: 907.276.7542
www.aogcc.alaska.gov
SCANNEV JAN 2 %u to
Stan Porhola
Operations Engineer I j�
Hilcorp Alaska, LLC
3800 Centerpoint Drive, Suite 1400
Anchorage, AK 99503
Re: Milne Point Field, Kuparuk River Oil Pool, MPU KR L-34
Sundry Number: 315-589
Dear Mr. Porhola:
Enclosed is the approved application for sundry approval relating to the above referenced well.
Please note the conditions of approval set out in the enclosed form.
As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further
time as the AOGCC grants for good cause shown, a person affected by it may file with the
AOGCC an application for reconsideration. A request for reconsideration is considered timely if
it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working
day if the 23rd day falls on a holiday or weekend.
Sincerely,
P
Cathy P Foerster
Chair
DATED this gay of October, 2015
Encl.
156
055'
• • RECEIVED
STATE OF ALASKA SEP 2 1 2015
ALASKA OIL AND GAS CONSERVATION COMMISSION , `o ' q )(.S
APPLICATION FOR SUNDRY APPROVALS Alai, .!
20 MC 25.280
1.Type of Request: Abandon❑ Plug Perforations ❑ Fracture Stimulate ❑ Pull Tubing ❑ Operations shutdown ❑
Suspend❑ Perforate ❑ Other Stimulate ❑ Alter Casing ❑ Change Approved Program ❑
Plug for Redrill❑ Perforate New Pool ❑ Repair Well ❑ Re-enter Susp Well ❑ Other. Suspended Well Renewal
2.Operator Name: 4.Current Well Class: 5.Permit to Drill Number.
Hilcorp Alaska, LLC Exploratory ❑ Development ❑ 197-080
3.Address:
Stratigraphic 11 Service E - 6.API Number.
3800 Centerpoint Drive,Suite 1400,Anchorage AK,99503 50-029-22766-00-00
7. If perforating: 8.Well Name and Number:
What Regulation or Conservation Order governs well spacing in this pool? C.O. 432C-
Will planned perforations require a spacing exception? Yes ❑ No Ri / MILNE PT UNIT KR L-34
9.Property Designation(Lease Number): 10.Field/Pool(s):
ADL0025514 • MILNE POINT/KUPARUK RIVER OIL
11. PRESENT WELL CONDITION SUMMARY
Total Depth MD(ft): Total Depth TVD(ft): Effective Depth MD(ft): Effective Depth TVD(ft): Plugs(measured): Junk(measured):
18,310 . 7,108 . 18,202 - 7,014 17,494'&18,808' N/A
Casing Length Size MD TVD Burst Collapse
Conductor 112' 20" 112' 112'
Surface 9,779' 9-5/8" 9,779' 4,442' 5,750psi 3,090psi
Intermediate 18,287' 7" 18,287' 7,088' 7,240psi 5,410psi
Liner
Perforation Depth MD(ft): Perforation Depth TVD(ft): Tubing Size: Tubing Grade: Tubing MD(ft):
2-7/8" 6.5#/L-80 2,599'
See Attached Schematic See Attached Schematic 4-1/2" 12.6#/L-80 17,514'
Packers and SSSV Type: Packers and SSSV MD(ft)and TVD(ft):
S-3 Packer and N/A 17,479'(MD)/6,408'(TVD)
12.Attachments: Description Summary of Proposal El ' 13.Well Class after proposed work:
Detailed Operations Program ❑ BOP Sketch ❑ Exploratory ❑ Stratigraphic❑ Development❑ Service ❑✓ '
14.Estimated Date for 15.Well Status after proposed work:
Commencing Operations: OIL ❑ WINJ ❑ WDSPL ❑ Suspended 0
•
16.Verbal Approval: Date: N/A GAS ❑ WAG ❑ GSTOR El SPLUG ❑
Commission Representative: N/A GINJ ❑ Op Shutdown ❑ Abandoned ❑
17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Stan Porhola
Email sporhola@hilcorp.com
Printed Name Stan Porhola Title Operations Engineer
Signature ,- c. Phone 777-8412 Date 9/21/2015
COMMISSION USE ONLY
Conditions of approval: Notify Commission so that a representative may witness Sundry Number:
315— 51�
Plug Integrity ❑ BOP Test ❑ Mechanical Integrity Test ❑ Location Clearance ❑
Other:
•c Sc&syr�eti...a i1--- . CJ r .J6111/4— Z 0 7444""-- GA( u...4---' I "ZoZ,y
Spacing Exception Required? Yes ❑ No I/ Subsequent Form Required: ik.3 0#Jt
n APPROVED BY
Approved by: A / /✓ / COMMISSIONER THE COMMISSION Date: /Q. /.
RBDMS +C T 1 is.....
�1 �K� v`13'/S ,07/2✓��� Submit Form and
Form 10-403 Revised 5/2015 ' Ap O ERNalAol•t12 months from the date of approval. Attachments in Duplicate
• •
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
Suspended Well Inspection Report
Date Inspected: 08/23/15
Inspector: Chuck Scheve Operator: Hilcorp.LLC
Well Name: MPL-34i Oper. Rep: Bill Kruskie
PTD No.: 197-080 Oper. Phone: 1-907-670-3387
Location Verified? Yes Oper. Email: wkruskieahilcorp.com
If Verified,How? Other(specify in comments)
Onshore/Offshore: Onshore
Date AOGCC Notified: 08/21/15
Suspension Date: 12/01/08 Type of Inspection: Subsequent
Sundry No.: 308-400 Wellbore Diagram Avail.? Yes
Photos Taken? Yes
Well Pressures(psi): Tubing NA
IA 90
OA 120
Condition of
Wellhead:
Good,No visable leaks and all gauges are installed,wellhouse,well head sign installed, tree has two work valves.BPV in hole.
Condition of
Surrounding Surface
Location: Good,little blue goo on fluts
Follow Up Actions
Needed: None.
Comments:
Map on location.
Attachments: Pictures REVIEWED BY:
Area map Insp.Supry
WBS Comm
PLB 12/2014 MPL-34 2015 Suspended Well Inspection Form
• •
Suspended Well Inspection Data
Well: MP L-34
Surface Location: 3284' NSL, 5106' WEL, Sec 8,T13N, R1OE UM
Permit to Drill: 197-080
API: 50-029-22766-00-00
AOGCC Inspection Date: 8-23-2015
AOGCC Inspector: Chuck Scheve
Size Pressure (psi)
IA 7" 80
OA 9-5/8" 100
*Note: Wellhead pressures to be recorded monthly at minimum.
Other Notes:
• MPL-34 is a WAG injector that was initially drilled and completed in 1997. The well was
drilled to a total depth of 18,310' with 7" casing run down to 18,287'. After it was
determined that the well was not supporting any of the offset producers, MPL-34 was
suspended in December 12th 2008.
• The original 4-1/2" tubing was pulled and utilized as a work string for MPC-43 for a CT
sidetrack. The tubing was replaced with a 2-7/8" kill string.
• In its current location, the injector does not support any production. The long-term
plans for this well may involve a re-development of the 7L Hydraulic Unit in the Kuparuk
reservoir, in which the well would be sidetracked to a better location with higher sweep
efficiency.
• Wellhead in good condition.
• Surrounding surface location in good condition. Area clean and free of any oil or sheen.
• No follow up actions required.
Attachments:
• Current Well Schematic
• Picture(s)
• L Pad Map
• •
Tree: 4 1/8"-5M CIW Dry Hole MPU L-34i Orig. KB Elev.= 52.88'(N 27E)
Wellhead:11" 5M FMC Gen.5 w/ Orig. GL Elev.= 17.10'
11" x 4.5"FMC Tbg. Hgr. ,4.5" RT To Tbg.Spool=35.7'(N 27E)
NSCT threads top and bottom,4"
CIW "H"BPV profile
20" 91.1 ppf, H-40 112'
2 7/8"Kill String 11.14,041 it,.►,.t.F
KOP @ 1000'
Max. hole angle=81 deg.@ 6,470'
79 deg.to 81 deg. (4,100'-14,700') 2 7/8"HES XN-Nipple 2555'
Hole angle thru'perfs=>31 deg. (2.250"No-Go ID)
WLEG 2599'
9 5/8",40#/ft, L-80 Btrc. 9,779'
Casing tested against CIBP
to 3500 psi 12/2/08
2 7/8"6.5 ppf,L-80, IBT Tubing
(drift ID=2.347",cap.=.0059 bpf)
4.5"12.6 ppf, L-80, IBT Tubing
(drift ID=3.958",cap.=.0152 bpf)
7"26 ppf,L-80,NSCC casing
(drift ID=6.151",cap.=0.0383 bpf)
Jet cut 4 1/2" tbg top 11/22/08 17,449'
7"x 4.5"Baker S-3 Perm pkr. 17,479'
4.5"Baker CIBP mid element
Stimulation Summary
4.5"HES XN-Nipple(3.725"id) 17,502'
WLEG 17,514'
Perforation Summary
Ref log: 5/22/97 LWD
Size SPF Interval (TVD) :
Shot with coil 1/15/01
2-7/8" 4 17,840'-17,860'
2-7/8" 4 17,868'-17,878' = e
Initial perforations
4.5" 5 17,906'-17,926' 6,775-6,791' :
4.5" 5 17,930'-17,970' 6,794'-6,829'
4.5" 5 18,004'-18,024' 6,858'-6,876' —
Coil:
2-7/8"power jet,4SPF,60 degree,EHD=.36 7"float collar(PBTD) 18,202'
TTP=27 7
E-Line: 4 k 7"float shoe 18,287'
51b HJ11 Deep penetrating charges
@ 60 deg.phasing
DATE FEV.BY COMtHNTS MILNE POINT UNIT
11/22/97 MDDOO Completion Naborrs 5 Nabors 27E WELL L-34
1/15/01 M.Linder Add perfs using Coil. API No:50-029-22766
11/22/08 REH Set CIBP and Cut TBG/CTU#9
12/3/08 L.Hulme Pull 4 1/2"Tbg and set 2 7/8"kill string
•
........ ,
I I air .11 A
lei si (10,1
:01,1
h I
•
WELL NAME MPI-341
OWNER Mdne Po.ONE
OPERATOR BP EwAoraliwn
SUR LOOATfON NW A Sw CIA 0130 RITE
MILLING PERMIT 97.80
immimmumart
*61104101INIIMMalli
•e iota
.• • •AV
•
'. • .
• t
Oil
:,-,.4,'.''.„''..;:-•1.,(1..,:,
,41
,..
......- .. .l..i..e.-dt••i'
A :1111111,
1
18I4'
11
hO,...i.:....1..'h.4....
°.1
. , .. ..
b.- Isill Ihilli;'
.
,.
,.. ° ,,,„...., -,,,:: ,, „ .
„----,
ilit44.44 ---
- " °
'',
,.. ,„, :,,,
-, -'. ----TP---------
-
uuIII
kV -
1.
!,', 1111111111
---.-
*'''''''''''
. _
: .
,.
--, ,1 •
II.
•
I
I
I 1
I I
I
._„.......,--
. .
. . ,.. . ,
. . .. . ..
. .. .
. ,- .. . ..
•
_, . .. ...... .
. , ,. . ...
:,.. . . ..... ..
... .._ . _ . . , . . .•
, __ ... ,. ; . _ ,; ....__ ..
_ . _
. .. .. . , _ ,.
... . ..
• . .. . _
.. ..... . .. _. . •
. _ .. _ ... .._ . • . . .. .
.. , ... ., . ....._.
.. ,_..,„,-,..,...,...::::._...,,;..:,„.„..,
:. .,... ....... f, ..,.. . ._._ .. ,-....._ : .. . : _.,,-._: :__..:_...,..4...,
. _ . ... .. • . . _ .. . . . .. . ' - .„,.., .. . - , , .., •
. .. -
. '
. •-
•er .
. ..
. •
•
--...,,
Ikb•‘.161
L116 °.
, .
a.
mill
._ ....
. ... . .. .
„.. ., .
OP- .
. ,
..,
, ...,
1 ....
-,.
.,.
1ANNA-
... ..,. .
! , , .,
,... .. ... .. , . ....,,, .... .. .. .. ..... ,... ...... . . 4 . ., p 40, hp.
1!47,1,rf*TatIlegtor.7,77,., ,,,, ,..,,t,i.:ii,'' e.”,f .-- ,- 1,`' , ;vilowiloc'1, .'f,.; ,'.,,' ''..-;;.; "'„i '-''-r4f„.. V,'....-;--,:-It4,;
.,;;Akt.,,,,,A,---,i,,,,,,,,,„,,,,,,,,t1tIrS,C%r-IP--'r,",t'''',"F''';:117.''';'"'-'.-"P'-.:;--"'''' ;',1M,'cc;,";',4,,,4, '4.'''''''''-' ' •
•.„,;1440-1, ,
- •H,Cf•lt-s,. .:11,',''`c,'1.''Ml.4.7r,;,*.V.C.:t!ti.',,,-.;;;‘,,f.4:4C!,4i1,Y,..li:,,,,;,.,14;`,`„3,:;',C,;:;:C;ii,;,,,,,,',,C,..4A#1,7,:,,f.r,t:L:,,,,,,,,,,,,,,,,,,,,,,, ,,,,, ,
,,..
.:,
li
fl[NAME MP1.341
We Poinl Unit
CAW
BP ExPiore°
D;URPI-til.:ApsTiOteN N97P1.8104 Se...08,113k MOE
...,-
...../
1.------,----------4"i
a
,..—, .......
WNW-
. .
.....
.
,
* . ....„.,-
.
*
. ,
dirttert...`„, j
;
- -
. . . - • -
. , . . .
, ,. . - • -.,
. -'' -• : ..
. — . .
' . -— .-•' '
- •- . . . .
• . .
. .
- -- ' — -
, „ . • . - ..,:-- - ..:
....- . , - . .., .•
' , - -' •-7.
..,... .
. . - - • . ,
- . . - ,-
• _ - . _ . ..., ,. . ' .
. ...
- ' ' '' • - . ...,
•
,. ..
' • . „. - . , , . „, , . .. . ,.... . ....
.. . . • — ,. .... . . . • . .
. —, ... ,
. , , , .- - — . .
,... . . . . -, - - - - . . . . -- . •
. .- -,,
•
•
. . • ..„ .• „ ••
• . . .. „, - . . , - . .., ...,.„..-. - , .
. ..
. ' .- •
. . . . : . . ... . , . ....-. • • •.---. . . - . . - . . -.
. _ .
„ . .
... -
. .
' • .
• - . — . . . . _ - -
. ,
. - . . ., . • . .- ,.. , . . .
.--
..... ,
. . . • '
' . .. . . . ....
..
.....
- .., ' .
. .. . . .. , ..
• .,,, - - - - . - . ,
a .,
...
,.....
.. .
,...,... .,.
404040001_10.04molowamover.* toor
..,
„.,, ..... .....
..!,
40.1411111164111.1111..111111.1111111W,Noo smommoo, ,
, mil
0 .
44
.., . .
"it * ,,••
, t
--':t
..i,
. ...... ,
..„ . .. ..,
.. ,
, ..,,.
. .
. , .... ..... . , ... . •.
. ,
,, ..
..
,.
aii
.,
- o. , i....,ily
,. :-
. :
.._ .
.... _-... .-................:. .......-.
,. -
, , .,
c
a a ,
li. - '...:..3'.,....,!,!.,:rallt . ,--.,, .1- ''
t
4
•
, .< ate.
T
a
; -
\ s',t,
{
•
1
'
; t
'
,........ \. ,
j
w
`1
l ' k
f v
A.
at t f
'8.11 A.
4:....':'
1,:' '' 4‘''' '4,' ',' , '''''.
)
t
.4 :':
■
. 11/1#040.0111111/1/ , 11.181110010/00
,--
W '.'": ' . • -'.'''''''
'''''• '''-'i"7•7•.,:t•;•,.,?•.,..',',;„,:',,,,•I':.;,,.:•:},*•':,-••••,‘,‘',;'-'"7.f,„,,?,'i:-::i:,......•,:t..•„,.....,,,,, ...„,„,,,,,,,-,
,. 4P
, .
.•,::';‘,,..'.-•:-,,,,..,,,„,, ,
.,.. ,,,:i.,...,.:-....-•1...,,--':-',,,,,.. „. -,,• ..,,,,,.•
1'-.'-'-'••.•'-'-i'ii-'-',' . ---.....„, i '---...,,,.. • -,•.-.:,%•-..v.,
,,,•,.,-• ' :„-,•'„:,:,' ,'. -.,,,.,.
' - 'IN•4**,
. ....,„„....„,....„. _.....;...,.....,.....:,........... --. .,-,.., ---, -.--
10
, ..
44
f.,•,..;
,,v ,-. • ' ..----4401tlit.
.., ..,
• -'
• , •;.... 40k,
.11ft.,
. ;
. ' ••, -
. . , .. ... . ,- . .'''''f:!;.!;;;i,'4.:,t4r.'-'.::;::::',:rl';
. . . . .. .
„.. - .
..„. .„ . ,... .
''' • ' ' ,
. . ',:,, ,,, '-'':',,,"‘•,-.1,4,, 44- -'s*, ,
,..
I - '•• _ .1,,,,;:.441i,`, ,-,..:, .
•• ,!:'...'" ..-•,'"c" 1* li l'.,,i1::','•'-'
..•.•,,,, , ., .•
,.. . ' t•"!:,"..,
.„. '
. ,, .•.,:.77,4;"'" ' ...,...
„ .
,, „ .. „.....
., ...„,,,,,,• .
.. . .
-,'.',...,:.. , . I ,. .. ,. .... . . „ . .
s.,..„ , ,,. . . :.,..
. . ..: , ,.
.,.„,,. • . :,
i„. ..„.,..,
..
A '.'. ',P'.:j%'',.*:'..:'::.,i• A
.,. .....,,.....
,
1 ,..., ' ,s,4,,• ,
, ;,. ...
, .
A.tr• • ,.• ...: *' * ,
.. .. •*. ,.'.-- ..' EP
. .
. • . , , 4
-.,,, , -.•—„,,,- ..,-
..., •
loomot, •.'....,...., .:,.., .... ..
. , ..„ .,.
.. .,.
, •,,,....,,,,,,,„ iii, . 6witit
.... .
. .,..„ ...,
,. .......... ,,
, •, 1
. '4 . •
i , i' ' .7 , tot. .:•„.: . .
. . .....,.. ................ . .... ...... .. .... .,.Vi, .
4 .
rt
"
+ aRNTNG
iiiki64041/0 14:46,\,;,zi,,,,40.'( 44
'
# e ic � .
f
$11° .!'•Z‘''''' ' ,,,....*4*:„',..z.,. .,..,7.'*'‘..„, ,;,---. '''''
_ 0400.00-000-00 .'4.r,;.-,`: "It, *rli .t% ''. '
� .
''' '' ''' 4 \ 4
Op° III
�
r
, . ,,,,,,::sil, ,,,, '4'.., 1.*(11, till°46 .
gid. N'
• '
.''''''' .. ' ..' : '' ' ' ' '''' '
� `a
I." -; / 4 * °
ti
q'
S �,r
� J
r r.4447074"*?' V.
,, ' , 4
., 4 4
4 4
. .
. ,,,. . \ 41
1
F.
, , .. i -,.„. --,-=',,,5,-.--_,,,,,,„J__::.; [21
� r
fix t
Orli` .... ' ',. ..,. si.
4 ri , , \--/ ,* �, m
rth
C
am I
40„._ ,..,4„.
V V) 4Y, \ ' \ H.,460$.4.° ‹. s 't..5, ..o..*,A ' ' '
i o%„* :--,, •,,--
'' 'f a\ tY j„...\I'. .i\ 9-
I.,v
vo ,t *`
,?e"., ' \ '1 \ '''''''.
.>.—L9'
t 1=72a ril
w.
, Y. , , "" 0
ms
,,,,:„,,,,,y,....-:,4,.....,....,-.:',,,,
R' \. ' , '0'''. .;,` `` ':'
i , \
7 ' # �r-Q _
r Sk
X y r
a 3 N -
. i
t,.,.--- ( A al 'O
n
INt
} —
µms.
II
• •
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
Suspended Well Inspection Report
Date Inspected: 08/23/15 -
Inspector: Chuck Scheve Operator: Hillcorp -
Well Name: MPU L-34 Oper.Rep: Bill Kruskie
PTD No.: 1970800 Oper. Phone: 907-670-3387 -
Location Verified? Yes Oper. Email: Milne-WellsiteSupervisorsahi
If Verified,How? Other(specify in comments)
Onshore/Offshore: Onshore
Suspension Date: 12/01/08 - Date AOGCC Notified: 08/20/15 •
Sundry No.: 308-400 Type of Inspection: Subsequent
Wellbore Diagram Avail.? Yes
Well Pressures(psi): Tubing - Photos Taken? Yes
IA 90 '
OA 120 -
Condition of
Wellhead:
Double gate valves. Back pressure valve installed.
Condition of
Surrounding Surface
Location: Good
Follow Up Actions
Needed: None
Comments:
Location verified by site map. Photos taken by operator available upon request.
Attachments: none SCANNED SEP 0 7 2016 REVIEWED BY:
Insp.Supry \Y`
-59115
Comm
PLB 06/2014 2015-0823_Suspend_MPU_L-34_cs.xlsx
XHVZE
Pages NOT Scanned in this Well History File
This page identifies those items that were not scanned during the initial scanning Project.
They are available in the original file and viewable by direct inspection.
File Number of Well History File
PAGES TO DELETE
RESCAN
Color items - Pages:
[] Grayscale, halftones, pictures, graphs, charts -
Pages:
[] Poor Quality Original- Pages:
Other- pages:
DIGITAL DATA
Diskettes, No.
Other, No/Type
'OVERSIZED
.Logs of vadous kinds
Other
Complete
COMMENTS:
Scanned by: ~verb, Mildred. D;relha ~Lowell
TO RE-SCAN
Notes:
Re-Scanned by: Bevedy Mildred Damtha Nathan Lowell Date: /s/
• •
bp
BP Exploration (Alaska) Inc.
Attn: Well Integrity Coordinator, PRB -20
Post Office Box 196612
Anchorage, Alaska 99519 -6612
F1. 4 201L
December 30, 2011
Mr. Tom Maunder g
Alaska Oil and Gas Conservation Commission \ 0 0 -
0
333 West 7 Avenue
Anchorage, Alaska 99501
Subject: Corrosion Inhibitor Treatments of MPL -Pad
Dear Mr. Maunder,
Enclosed please find multiple copies of a spreadsheet with a list of wells from MPL -Pad
that were treated with corrosion inhibitor in the surface casing by conductor annulus.
The corrosion inhibitor is engineered to prevent water from entering the annular space
and causing external corrosion that could result in a surface casing leak to atmosphere.
The attached spreadsheet represents the well name, API and PTD numbers, top of
cement depth prior to filling and volumes of corrosion inhibitor used in each conductor.
As per previous agreement with the AOGCC, this letter and spreadsheet serve as
notification that the treatments took place and meet the requirements of form 10 -404,
Report of Sundry Operations.
If you require any additional information, please contact me or my alternate, Gerald
Murphy, at 659 -5102.
Sincerely,
Mehreen Vazir
BPXA, Well Integrity Coordinator
, r, :as:.::,,M.ja a -.m r N m" g, R. -1 r T +` .7 , ++ ' . ... 47."',. -' T - �&+ Za.rOMMIEW WWWWW . - ,, r BED. ., , ..., - ... ...
0 0
i
BP Exploration (Alaska) Inc.
Surface Casing by Conductor Annulus Cement, Corrosion inhibitor, Sealant Top-off
Report of Sundry Operations (10 -404)
MPL -Pad
Date: 10 /08/11
Corrosion
Initial top of Vol. of cement Final top of Cement top off Corrosion inhibitor/
Well Name PTD # API # cement pumped cement date inhibitor sealant date
ft bbls ft gal
MPL -01A 2030640 50029210680100 Sealed conductor N/A N/A N/A N/A NA
MPL -02A 2091470 50029219980100 Sealed conductor N/A N/A N/A N/A NA
MPL -03 1900070 50029219990000 Tanko conductor N/A N/A N/A N/A NA
MPL-04 1900380 50029220290000 Sealed conductor N/A N/A N/A N/A NA
MPL -05 1900390 50029220300000 Sealed conductor N/A N/A N/A N/A NA
MPL -06 1900100 50029220030000 Sealed conductor N/A N/A N/A N/A NA
MPL -07 1900370 50029220280000 Sealed conductor N/A N/A N/A N/A NA
MPL-08 1901000 50029220740000 Sealed conductor N/A N/A N/A N/A NA
MPL -09 1901010 50029220750000 Sealed conductor N/A N/A N/A N/A NA
MPL -10 1901020 50029220760000 Sealed conductor N/A N/A N/A N/A NA
MPL -11 1930130 50029223360000 Sealed conductor N/A N/A N/A N/A NA
MPL -12 1930110 50029223340000 Sealed conductor N/A N/A N/A N/A NA
MPL -13 1930120 50029223350000 Sealed conductor N/A N/A N/A N/A NA
MPL -14 1940680 50029224790000 Sealed conductor N/A N/A N/A N/A NA
MPL -15 1940620 50029224730000 3.3 N/A 3.3 N/A 15.3 8/9/2011
MPL -16A 1990900 50029225660100 23 Needs top job ,
MPL -17 1941690 50029225390000 0.2 N/A 0.2 N/A 5.1 9/1/2011
MPL -20 1971360 50029227900000 0.4 N/A 0.4 N/A 3.4 8/10/2011
MPL -21 1951910 50029226290000 1.7 N/A 1.7 N/A 8.5 8/10/2011
MPL -24 1950700 50029225600000 0.2 N/A 0.2 N/A 8.5 10/8/2011
MPL -25 1951800 50029226210000 1.7 N/A 1.7 N/A 15.3 8/10/2011
MPL -28A 1982470 50029228590100 0.3 N/A 0.3 N/A 8.5 10/8/2011
MPL -29 1950090 50029225430000 0.5 N/A 0.5 N/A 3.4 8/1/2011
MPL -32 1970650 50029227580000 0.5 N/A 0.5 N/A 5.1 8/10/2011
MPL -33 1971050 50029227740000 0.2 N/A 0.2 N/A 8.5 10/8/2011
---- -> MPL -34 1970800 50029227660000 1.7 N/A 1.7 N/A 8.5 8/9/2011
MPL -35A 2011090 50029227680100 0.2 N/A 0.2 N/A 8.5 10/82011
MPL -36 1971480 50029227940000 0.1 N/A 0.1 N/A 7.6 9/1/2011
MPL-37A 1980560 50029228640100 6 N/A 6 N/A 47.6 8/13/2011
MPL-39 1971280 50029227860000 1.7 N/A 1.7 N/A 6.8 8/8/2011
MPL-40 1980100 50029228550000 1 N/A 1 N/A 6.8 8/8/2011
MPL -42 1980180 50029228620000 5.3 N/A 5.3 N/A 30.6 8/14/2011
MPL-43 2032240 50029231900000 17.5 Needs top job
MPL-45 1981690 50029229130000 10 N/A 10 N/A 8.5 8/10/2011
•
•
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
Suspended Well Inspection Report
Date Inspected: 09/12/10
Inspector: Chuck Scheve Operator: BPX
Well Name: MPU L-34 Oper. Rep: Lee Hulme
PTD No.: 1970800 Oper. Phone: 659-5766
Location Verified? No Oper. Email:
If Verified, How?
Onshore / Offshore: Onshore
Suspension Date: 12/01/08 Date AOGCC Notified:
Sundry No.: 308-400 Type of Inspection: Initial
Wellbore Diagram Avail.? Yes
Well Pressures (psi): Tubing BPV installed " Photos Taken? Yes
IA 0 - by Operator
OA 0
Condition of
Wellhead: Barricade in place, double master valves . No well sign.
Condition of -
Surrounding Surface OK
Location:
Follow Up Actions Install well sign.
Needed:
Attachments: None REVIEWED BY:
Insp. Supry "A 7( 4
Comm
< it 1:
PLB 08/2010 2010-0912_Suspend_MPU_L-34_cs.xls
;~~ p -
- ~ ~~ STATE OF ALASKA ' ~' ` " R ~C E' ~G
~`~ '•i` ALASK~L AND GAS CONSERVATION CO~SION
- `'~~ ~ W AND LOG ~ ~ ~ ~ 1 2008
~ 1~ ELL COMPLETION OR RECOMPLETION REPORT
1
~~it.5ka Oil ~ has Cons. Commission
1 a. Well Status: ^ Oil ^ Gas ^ Plugged ^ Abandoned ®Suspended ~
zoAAC zs.,os zoAAC zs.,,o
^ GINJ ^ WINJ ^ WDSPL ®WAG ~ ^ Other No. of Completions Zero 1 b. Well Class: ,~nC a g
^ Development U Exploratory
®Service ~ ^ Stratigraphic
2. Operator Name:
BP Exploration (Alaska) Inc. 5. Date Comp., Susp., or Aban
12/i/2008 12. Permit to Drill Number
197-080 - 308-400
3. Address:
P.O. Box 196612, Anchorage, Alaska 99519-6612 6. Date Spudded
05/08/1997 13. API Number
50-029-22766-00-00
4a. Location of Well (Governmental Section):
Surface:
'
' 7. Date T.D. Reached
05/20/1997 14. Well Name and Number:
MPL-34
3285
FSL, 5106
FEL, SEC. 08, T13N, R10E, UM
Top of Productive Horizon:
3470' FSL, 5104' FEL, SEC. 24, T13N, R09E, UM
8. KB (ft above MSL): 50.88' ~
Ground (ft MSL): 17.8'
15. Field /Pool(s):
Milne Point Unit / Kuparuk River
Total Depth:
3336' FSL, 5267' FEL, SEC. 24, T13N, R09E, UM 9. Plug Back Depth (MD+TVD)
18202' 7014' Sands
4b. Location of Well (State Base Plane Coordinates, NAD 27):
Surface: x- 544775 y- 6031474 Zone- ASP4 10. Total Depth (MD+TVD)
18310' - 7108' 16. Property Designation:
ADL 025514 -
TPI: x- 534376 y- 6021044 Zone- ASP4
Total Depth: x- 534214 y- 6020910 Zone- ASP4 11. SSSV DeN A(MD+TVD) 17. Land Use Permit:
18. Directional Survey ^Yes ®No
' I r ni n rin inf rm i n er 20 AAC 25. 19. Water depth, if offshore
N/A ft MSL 20. Thickness of Permafrost (TVD):
1800' (Approx.)
21. Logs Obtained (List all logs here and submit electronic and printed information per 20 AAC 25.071):
MWD, CDR, GR, DWOB, DTOO, DIR
22. CASING, LINER AND CEMENTING RECORD
CASING SETTING DEPTH MD SETTING DEPTH TVD HOLE AMOUNT
WT. PER FT. GRADE TOP BOTTOM TOP BOTTOM SIZE CEMENTING RECORD PULLED
0" 1.1# H-4 urface 11 112' 4" 25 s Arc i I A r x.
" 1' 900 sx PF 'E' 1250 sx 'G' 1040 sx PF 'E'
7" 2 L- 3' 1 7' 7 -1 I '
23. Open to production or inject ion? ®Yes ^ No 24. TUBING RECORD
If Yes, list each i
(MD+TVD of Top & Bottom; Pe nterval open
rforation Size and Number): SIZE DEPTH SET MD PACKER SET MD
2-7/8" Gun Diameter, 4 SPF 4-1/2"
Gun Diameter
5 SPF 2-7/8", 6.5#, L-80 (Kill String) 2599'
,
,
MD TVD MD TVD 4-1/2", 12.6#, L-80 17449' - 17514' 17479'
17640' -17860' 6707 - 6724' 17906' - 17926' 6762' - 6779'
17868' - 17878' 6730' - 6739' 17930' - 17970' 6783' - 6816' 25. ACID, FRACTURE, CEMENT SQUEEZE, ETC.
~-" a ~ c~~K{~-,~~
- ~ f~ hC
~%~..~~.-~:+~k
18024' 6845' -6662'
DEPTH INTERVAL MD
AMOUNT $c KIND OF MATERIAL USED
r
n! 4 4 ~ Freeze Protected with 100 Bbls of Diesel
26. PRODUCTION TEST
Date First Production: ~
Not on Injection Method of Operation (Flowing, Gas Lift, etc.):
Date Of Test: HOUrS Tested: PRODUCTION FOR
TEST PERIOD OIL-BBL: GAS-MCF: WATER-BBL: CHOKE SIZE: GAS-OIL RATIO:
Flow Tubing
Press. Casing Press: CALCULATED
24-HouR RATE• OIL-BBL: GAS-MCF: WATER-BBL: OIL GRAVITY-API (CORK):
27. CORE DATA Conventional Core(s) Acquired? ^Yes ^ No Sidewal l Core s A wired? ^Yes ®No
If Yes to either question, list formations and intervals cored (MD+TVD of top and bottom of each), and summarize lithology and presence of oil, gas or water
(submit separate sheets with this form, if needed). Submit detailed descriptions, core chips, photographs and laboratory analytical results per 20 AAC 250.071.
-.:: t
None `/~';,:-L..
;r
Form 10-407 Revised 02/2007 CONTINUED ON REVERSE SIDE ~ ~~~' ~~IW ~ ~ w!JU°e
G
r~
~~
28. GEOLOGIC MARKERS (LIST ALL FORMATIONS AND MARKERS ENCOUNTERED): 29. FORMATION TESTS
NAME MD TVD Well Tested? ^ Yes ®No
Pemlaftost Top If yes, list intervals and formations tested, briefly summarizing test
results. Attach separate sheets to this form, if needed, and submit
Permaftost Base detailed test information per 20 AAC 25.071.
TKLB 17472' 6402' None
TKUD 17661' 6558'
TKUC 17798' 6672'
TKA3 17905' 6762'
TKA2 17930' 6783'
TKA1 17977' 6822'
TMLV 18024' 6862'
Formation at Total Depth (Name):
30. List of Attachments: Summary of Daily Drilling Reports, Well History Summary and a Well Schematic Diagram.
31. I hereby certify that the foregoing is true and correct to the best of my knowledge.
yam,
Signed Sondr Stewman --~-Title Drilling Technologist Date f p~ `- ~~ "v~
MPL-34 197-080 308-400 Prepared ByName/Number. Sondra Stewman, 564-4750
Drilling Engineer: Howard West, 5645471
Well Number P i N .
INSTRUCTIONS
GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit a
well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed.
treM 1a: Classification of Service Wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water Supply for Injection,
Observation, or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely
segregated. Each segregated pool is a completion.
IreM 4b: TPI (Top of Producing Interval).
IreM 8: The Kelly Bushing and Ground Level elevation in feet above mean sea level. Use same as reference for depth measurements given in other
spaces on this form and in any attachments.
IreM 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00).
IreM 20: Report true vertical thickness of permafrost in Box 20. Provide MD and ND for the top and base of permafrost in Box 28.
IreM 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool.
IreM 23: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the
producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced,
showing the data pertinent to such interval).
IreM 26: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, or Other (explain).
IreM 27: Provide a listing of intervals cored and the corresponding formations, and a brief description in this box. Submit detailed description and analytical
laboratory information required by 20 AAC 25.071.
IreM 29: Provide a listing of intervals tested and the corresponding formation, and a brief summary in this box. Submit detailed test and analytical laboratory
information required by 20 AAC 25.07E
Form 10-407 Revised 02/2007 Submit Original Only
•
Tree: 4 1/8" - 5M CIW Dry Hole
Wellhead: 11" 5M FMC Gen. 5 w/
11" x 4.5" FMC Tbg. Hgr. , 4.5"
NSCT threads top and bottom, 4"
CIW "H" BPV profile
20" 91.1 ppf, H-40 112'
MPU L-34i
KOP C~3 1000'
Max. hole angle = 81 deg. C~ 6,470'
79 deg. to 81 deg. (4,100' - 14,700')
Hole angle thru' perfs = > 31 deg.
9 5/8", 40#/ft, L-80 Btrc. 9,779'
2 7/8" 6.5 ppf, L-80, IBT Tubing
( drift ID = 2.347", cap.= .0059 bpf )
4.5" 12.6 ppf, L-80, IBT Tubing
( drift ID = 3.958", cap.= .0152 bpf )
7" 26 ppf, L-80, NSCC casing
( drift ID = 6.151", cap. = 0.0383 bpf )
Stimulation Summary
Perforation Summary
Ref log: 5/22/97 LWD
Size SP Interval (TVD)
Shot with coil 1/ 5101
2-7/8" 4 17,840'-17,860'
2-7/8" 4 17,868'-17,878'
Initial perforate ns
4.5" 5 17,906'-17,926' 6,775'-6,791'
4.5" 5 17,930'-17,970' 6,794'-6,829'
4.5" 5 18,004'-18,024' 6,858'-6,876'
Coil:
2-7/8" power jet, 4SPF, 60 degree, EHD=.36
TTP= 27.7
E-Line:
51 b HJ11 Deep penetrating charges
~ 60 deg. phasing
Orig. KB Elev. = 52.88' (N 27E)
Orig. GL Elev... 17.10'
RT To Tbg. Spool = 35.7' (N 27E)
2 7/8" Kill String
2 7/8"HES XN-Nipple 2555'
(2.250" No-Go ID)
W LEG 2599'
Casing tested against CIBP
to%3500 psi 12/2/08
'Jet cut 4 112" tbg top 11 /22/08 17,449'
7"x 4.5" Baker S-3 Perm pkr. 17,479'
17,494
4.5" Baker CIBP mid element
4.5"HES XN-Nipple (3.725"id) 17,502'
WLEG 17,514'
7" float collar (PBTD) 18,202'
7" float shoe 18,287'
DATE EV. BY COMMENTS
5 - 31 -97
11/22/97 MDO
MDO Drilled and cased by Nddborn 27E
Com letion Nabors 5 S
1/15/01 M. Linder Add perfs using Coil.
11/22/08 REH Set CIBP and Cut TBG/ CTU #9
12/3/08 L. Hulme Pull 4 1/2" Tbg and set 2 7/8" kill string
MILNE POINT UNIT
WELL L~34
API No: 50-029-22766
BP EXPLORATION (AK)
•
Well History
•
Well Date Summary
MPL-34 11/6/2008 (MITx Va) T/V0= 2000/500/0 Rig-Up and PT to 3500 Psi. Awgers continued on 11-07-08.
MPL-34 11/7/2008 (MITx IA / FP FL) T/V0= 2000/500/0 Pump 3 bbls diesel down IA to press. up to 2500 Psi. Mffx Va -
Inttial press. = 2000/2500/0 - 15 Nin Fress.= 2000/2490/0. 30 Nin Fress.= 2000/2485/0 MITx Va is a Pass.
Bleed IA press to 400 Psi. FWHP= 2000/400/0 (FP flow line w ith 2 bbls 60/40 then 3 bbls diesel then 2
bbls 60/40 meth.) (wing=shut /swab=shut /ssv=shut /master=open / Va and OA open to gauges.
MPL-34 11/8/2008 T/V0=2000/400/0 Assist S-line (Pre-RWO) -Pumped tbg w/43 bbls crude, 7 bbls diesel & 506 bbls
produced w ater & 38 bbls 60/40 to assist s-line getting dow n hole. Awgers continued on 11-09-08.
MPL-34 11/8/2008 ***WELL S/I ONARRNAL*** (pre rwo)
DRIFT W/ 3.69" CENT TO 15500' SLM
ON BOTTOM W/ PDS CALIPER TOOLS
***CONT ON WSR 11-09-08***
MPL-34 11/9/2008 (Assist Slickline) T/V0= 2000/400/0 Pump produced w ater dow n TBG to assist Slickline. Freeze protect
TBG w ith 5 bbls neet meth and 33 bbls 60/40. FWHP= 1800/560/280. Slickline on w ell @ time of
departure. Va and OA open to gauges.
MPL-34 11/9/2008 *** WELL S/I ON ARRIVAL*** (pre rw o)
LRS PUMPED 155 bbls WATER, 42 bbls METH TO ASSIST RIH (high deviation)
CURRENTLY RIH W/ X-LINE & 3.813" XXN PLUG
*'* CONT ON 11/10/08 *"
MPL-34 11/9/2008 Fluid Support for Upcoming Work
MPL-34 11/9/2008 (Assist Slickline) T/V0=1800/400/0 Pump 252 bbls produced water and 45 bbls 60/40 meth to assist
Slickline going dow n hole. Awgers continued on 11-10-08.
MPL-34 11/9/2008 '**CONT FROM WSR 11-8-08***
COMPLETE CALIPER FROM 15550' SLM TO SURFACE
***WELL S/I ON DEPART`**
MPL-34 11/10/2008 (Assist Slickline) 7/V0= 1800/400/0 Pump 38 bbls 60/40 meth to freeze protect TBG. Pr TBG to 2500
Psi /Ran out of fluid @ 2000 Psi. TBG press. dropped to 1860 in 10 minutes. Job cancelled. FWHP=
1800/360/0 (Slickline on w ell @ time of departure. V~1 and OA open to gauges.)
MPL-34 11/10/2008 *** CONTINUED FROM 11/9/08 ***
SET 3.813" XXN PLUG IN XN NIP @ 17,502' MD
UNABLE TO PERFORM Mff-T. LR5 TO TEST PLUG LATER
*** WELL S/I ON DEPARTURE, DSO NOTIFIED ***
MPL-34 11/10/2008 Fluid Support/Travel
MPL-34 11/11/2008 T/V0=1060/400/0 Temp=Sl Mff T FAILm to 2500 psi (Post Plug/Pre-RWO) -Pumped tbg with a total
of 12 bbls 60/40 methanol in 8 attempts to test. Tbg lost an average of 1000 psi in 10 mins on each
attempt & required an average of 1.3 bbls to re-pressure to 2500 psi. Tag w ell, Va/OA & master open.
Swab, ssv &wing closed. Notify operator. Final WHPs=1000/400/0
MPL-34 11/16/2008 T/IA/OA= SSV/0/0 Temp=cold PPPOT-T (PASS) PPPOT-IC (PASS) (Pre RWO)
PPPOT-T RU 2 HP BT onto THA test void, 100 psi to 0 psi, flushed void until clean returns achieved.
Pressured to 5000 psi for 30 minute test, 5000/ 15 minutes, 5000/ 30 minutes. Bled void to 0 psi, RD
test equipment, cycled LDS out 1.0" ran in torqued "ET'style" all were in good working condition.
PPPOT-IC RU 2 HP BT onto 1C test void, 200 psi to 0 psi, flushed void until clean returns achieved.
Pressured to 3500 psi for 30 minute test, 3450/ 15 minutes, 3450/ 30 minutes. Bled void to 0 psi, RD
test equipment, cycled LDS out 1.0" ran in torqued "ET style" all w ere in good working condition.
MPL-34 11/21/2008 CTU #9 w/ 1.75" OD CT. MIRU CTU. MU and RIH w ith Baker 4" hydraulic release G spear. Tag
plug/fish @ 11506'. PU 1st time to 22k, nojar fire. Pump on plug, compare to results prior to tagging
plug. Re-tag twice. Flag pipe 100' above XN @ 17402'. POOH. Continued on 11/22/08 WSR.
MPL-34 11/21/2008 CTU #9 w/ 1.75" OD CT. MIRU CTU. MU and FJH with Baker 4" hydraulic release G spear. Tag
plug/fish @ 11506'. PU 1st time to 22k, nojar fire. Pump on plug, compare to results prior to tagging
plug. Re-tag twice. Flag pipe 100' above XN @ 17402'. POOH. Continued on 11/22/08 WSR
MPL-34 11/21/2008 CTU #9 w/ 1.75" OD CT. MIRU CTU. ...........
MPL-34 11/21/2008 CTU #9 w/ 1.75" OD CT. MIRU CTU. MU and RIH w ith Baker 4" hydraulic release G spear. Job in
progress...
Print Date: 12/29/2008 Page 1 of 2
• •
Well Date Summary
MPL-34 11/22/2008 CTU #9 w/ 1.75" OD CT. Continued from 11/21/08 WSR Interact broadcasting-ryes. Recovered 4.5"
XXN plug from XN nipple @ 17502'. MU/RIH w ith nipple locator and Baker 4.5" CIBP. Depth correlate at
nipple. Set Baker CIBP at 17497' mid-element (ref: tubing tally) in the first pup joint above the XN nipple.
Ressure test plug: MIT-T passed to 2727 psi. Pumped 1 bbl 60/40 meth/water to pressure tubing to
2727 psi. Tubing pressure gained 15 psi in first 15 minute monitor and gained 23 psi in second 15 minute
monitor for a total gain of 38 psi in 30 minutes. Attribute small increase in test pressure to thermal
expansion of the cold 60/40 meth/water that w as circulated into the coil tubing prior to beginning MITT.
Pull to surface. MU and RIH w ith 4.5" SLB pow er jet cutter on BCF firing head. Job in progress...
MPL-34 11/22/2008 Continued from 11/21/08 WSR Interact broadcastingyes. Recovered 4.5" XN plug fromXN nipple @
17502'. MU/RIH w /Baker 4.5" CIBP.
MPL-34 11/22/2008 CTU #9 w 11.75" OD CT. Continued from 11/21/08 WSR Interact broadcasting=yes, Recovered 4.5"
XXN plug from XN nipple @ 17502'. MU/RIH w ith nipple locator and Baker 4.5" CIBP. Depth correlate at
nipple. Set Baker CIBP at 17497' mid-element (ref: tubing tally) in the first pup joint above the XN nipple.
Ressure test plug: MIT-T passed to 2727 psi. Pumped 1 bbl 60/40 meth/water to pressure tubing to
2727 psi. Tubing pressure gained 15 psi in first 15 minute rronitor and gained 23 psi in second 15 rrrnute
monitor for a total gain of 38 psi in 30 minutes. Attribute small increase in test pressure to thermal
expansion of the cold 60/40 meth/w ater that w as circulated into the coil tubing prior to beginning Mff-T.
Pull to surface. MU and RIH w ith 4.5" SLB powerjet cutter on BCF firing head. Tie in to flag, reset
counter to top shot of cutter. Continued on 11/23/08 WSR.
MPL-34 11/23/2008 Continued from 11/22/08 WSR Interact publishing =yes. Drop 0.5" steel ball. Shoot Jet Cutter @
17449'. Establish T/I communication. POOH. Freeze protect wellbore to 2500' w/water/meth.
Confirmed jet cutter fired, recover ball. RDMO. Job complete.
MPL-34 11/24/2008 MPU Well Support Techs demobed well house flow-fines and foundation Note BPV is installed. Note the
foundation w as left in the ground do to it only being 2 inchs above grade
talked it over w ith 3S Willmer and he said they needed to bring fill for the the rig to be level anyway.
MPL-34 11/24/2008 T/V0=0/0/0 (CHIT T x Va to 1000 psi PASSED) Ramped 7.4 bbls Diesel down IA to bring VaP up to
1000 psi and TP up to 450 psi. Lost 20 psi from V>P and gained 20 psi to TP in 1st 15 minutes. Lost 5 psi
from IAP and lost 20 psi from TP in 2nd 15 minutes. Bleed pressure on IA and Tubing dow n to 0 psi. and
monitored for 30 minutes. Found inoperative gauge on tubing w hile bleeding dow n pressure. Replaced
gauge. No pressure gains on tubing or IA. Performed 2nd CHIT due to inoperative gauge. Lost 0 psi in
first 15 minutes & 10 psi in second 15 minutes. Bleed pressures dow n from tbg side. CMfT T x IA to
1000 psi. Passed. Lost 0 psi on tbg & 0 psi on IA in first 15 minutes. Lost 0 psi on tbg & 0 psi on IA in
second 15 minutes. Bleed pressures dow n to 0 psi. Monitor tbg & IA pressures for 30 minutes.
Ressures remained static. FWHP=O/0/0.
MPL-34 11/25/2008 Spot Coil 9 on Gpad dumpster. Hydraulically cut 2500' stinger of 1.75" CT.
MPL-34 12/2/2008 (Assist Nabors Rig-3S) Standby for Rig
MPL-34 12/3/2008 (Assist Nabors Rig-3S) T/V0= 0/0/0 Pump 100 bbls diesel dow n TBG for TBG / IA freeze
protect.FWHP= 0/0/0
Print Date: 12/29/2008 Page 2 of 2
•
BP EXPLORATION Page 1 of 3
Operations Summary Report
Legal Well Name: MPL-34
Common Well Name: MPL-34 Spud Date:
Event Name: WORKOVER Start: 11/26/2008 End:
Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 12/3/2008
Rig Name: NABOBS 3S Rig Number:
Date I From - To Hours Task ~'I Code NPT ' Phase Description of Operations
11/28/2008 16:00 - 17:30 1.50 RIGD P PRE Rig released from MPL-06. RD and prep for move to MPL-34.
17:30 - 18:00 0.50 RIGD P PRE Hold Pretour safety meeting with rig crew. Discussed recent
hand accidents, anti slip for boots while moving rig, and need
to hold safety meetings prior to each task or when work scope
changes.
18:00 - 21:30 3.50 RIGD P PRE Derrick scoped down and layed over. Remove hand rails and
fold up stairs. Raise modules and remove matting boards.
21:30 - 22:00 0.50 RIGD P PRE Hold safety meeting with Peak drivers and rig crew. Open unit
work permit for well MPL-34 and do pre-rig inspection with L
pad operator.
22:00 - 00:00 2.00 RIGD P PRE Move upright tank, pits, pipeshed, and sub off MPL-06 and
stage. Remove BOP craddle and spot behind well slot
MPL-34. Lay herculite and matting boards.
11/29/2008 00:00 - 02:00 2.00 RIGU P PRE Spot heater core, single gate, and annulus valves behind well
MPL-34. Spot sub over well and level as needed. Pad
operator witnessed. Do post rig inspection and close out unit
work permit for well MPL-06.
02:00 - 04:00 2.00 RIGU P PRE Spot pipe shed and pits, lay herculite and set matting boards.
04:00 - 08:00 4.00 RIGU P PRE Berm rig complexes and hook up utility lines to complexes. Set
stairs and hand rails. Raise and scope derrick. Continue
hooking up rig.
08:00 - 11:00 3.00 RIGU P PRE Accept Rig Ca? 08:00. Begin to RU on tree. RU Tiger tank and
circulation lines. Load pits with inhibited SW.
11:00 - 12:00 1.00 WHSUR P DECOMP PUMU lubricator. Test with diesel to 1000 psi. Open well and
pull 4" CIW Type H BPV. Tbg / IA / OA - 60 / 0 / 0 psi. Lay
down lubricator.
12:00 - 13:00 1.00 WHSUR P DECOMP Blow steam and air through all circulation lines. Test lines to
tiger tank to 500 psi. Test lines to closed choke to 3500 psi.
PJSM with all personnel.
13:00 - 17:30 4.50 KILL P DECOMP Circulate inhibited SW down Tbg with returns from IA through
choke to tiger tank. Circulate (~ 4 BPM, 1450 psi. Circulate
surface to surface (600 Bbls) and flowcheck well. Tubing and
IA at 0 psi. Clrculate another 150 Bbls C~3 4 BPM, 1350 psi.
Blow down lines. Flowcheck well - 0 psi T/IA/OA.
17:30 - 18:00 0.50 KILL P DECOMP FMC dry rod TWC in.
18:00 - 19:00 1.00 KILL P DECOMP Service rig and perform pretour checks.
19:00 - 20:30 1.50 KILL P DECOMP Test TWC from above to 3500 psi and from below to 1000 psi
for 10 charted minutes each.
20:30 - 21:30 1.00 KILL P DECOMP Rig down circulating lines in cellar.
21:30 - 23:30 2.00 KILL P DECOMP FMC bleed adapter void and nipple down adapter and tree.
Functioned 4-1/2" NSCT X-O - 7 turns. Split tree to remove
from cellar and send to DSM to build dryhole tree.
23:30 - 00:00 0.50 KILL P DECOMP Hold PJSM for Nippling up BOPE.
11/30/2008 00:00 - 08:00 8.00 BOPSU P DECOMP Nipple up BOPE. Install 13-5/8" x 11" DSA, set single gate, set
double gate and annular and torque all nuts to specified torque.
Change top pipe rams to 4-1/2" fixed ram blocks. Install
choke and kill lines. Function test BOPE components. Load
2-7/8" EUE tubing in pipe shed and strap.
08:00 - 13:30 5.50 BOPSU P DECOMP BOPE test to 250 / 3500 psi. Use 2-7/8" and 4-1/2" test joints.
AOGCC waived State's right to witness testing (bob Noble).
Monitor IA during entire BOPE testing.
13:30 - 15:00 1.50 BOPSU P DECOMP PUMU lubricator with extension. Screw into TWC. 0 psi on IA.
Pull TWC to 0 psi on tubing. Rig down lubricator and
Printed: 12/18/2008 1:25:04 F'M
BP EXPLORATION Page 2 of 3
Operations Summary Report
Legal Well Name: MPL-34
Common Well Name: MPL-34 Spud Date:
Event Name: WORKOVER Start: 11/26/2008 End:
Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 12/3/2008
Rig Name: NABOBS 3S Rig Number:
Date I'~ From - To ~ Hours Task II Code ' NPT ~ Phase Description of Operations
11/30/2008 13:30 - 15:00 1.50 BOPSU P
15:00 - 16:00 1.00 BOPSU P
16:00 - 17:00 1.00 BOPSU P
17:00 - 18:00 1.00 BOPSU P
18:00 - 18:30 0.50 BOPSU P
18:30 - 20:00 1.50 BOPSU P
20:00 - 20:30 0.50 BOPSU P
20:30 - 00:00 3.50 BOPSU P
12/1/2008 00:00 - 06:00
06:00 - 14:30
6.00 PULL P
8.50 PULL P
14:30 - 16:00
16:00 - 18:00
18:00 - 18:30
18:30 - 20:30
20:30 - 22:00
22:00 - 00:00
12/2/2008 00:00 - 02:30
02:30 - 04:00
04:00 - 05:00
05:00 - 06:00
06:00 - 22:30
22:30 - 00:00
12/3/2008 00:00 - 01:30
01:00 - 01:30
01:30 - 03:30
03:30 - 04:00
1.50 WHSUR P
2.00 WHSUR P
0.50 WHSUR P
2.00 WHSUR P
1.50 WHSUR P
2.00 BUNCO
2.50 BUNCO
1.50 BUNCO
1.00 BUNCO
1.00 BUNCO
16.50 BOPSU P
1.50 WHSUR P
1.50 WHSUR P
0.50 WHSUR P
2.00 WHSUR P
0.501 WHSURIP
DECOMP extension. RU floor to pull hanger.
DECOMP PUMU 3-1/2" landing joint with XO and TIW valve in top.
Torque up XO to 4-1/2" NSCT pin on bottom.
DECOMP Screw into hanger with 7 turns. Break out lock down screws on
tubing hanger. EPOCH calibrate instrumentation. Pull hanger
with 110K PUW. BOLD hanger and landing joint. Fill hole,
flowcheck well -stable.
DECOMP POH laying down 4-1/2" tubing completion. Pumping across
the top with inhibited SW.
DECOMP Service rig and perform daily inspections.
DECOMP Continue POH with 4-1/2" 12.6# L-80 IBT tubing laying down
1x1 to pipe shed. Pumping across the top of hole with inhibited
SW.
DECOMP Hold safety meeting with crew, tour pusher, and Night WSL.
Discussed hand injury on 9-ES.
DECOMP Continue POH with 4-1/2" 12.6# L-80 IBT tubing laying down
1x1 to pipe shed. Pumping across the top of hole with inhibited
SW.
DECOMP Continue POH with 4-1/2" 12.6# L-80 IBT tubing laying down
1x1 to pipe shed. Pumping across the top of hole with inhibited
SW.
DECOMP Service rig, crew change and PJSM. Continue POH laying
down 4-1/2" tubing. Lay down 426 full joints of 4-1/2",
12.6#,L-80 IBT tubing, 1 - 10' pup joint, 1 XO pup (4-1/2" IBT x
4-1/2" NSCT), 1- XN nipple, 1-cut joint. (length of cut joint = 24'
/leaving +/- 17' tubing stub looking up in hole).
RUNCMP Clean and clear rig floor. PU 11" FMC test plug. Set test plug ~
with FMC torquing up lock down screws.
RUNCMP Close blind rams. PJSM. Change top rams from fixed 4-1/2"
to fixed 2-7/8".
RUNCMP Sevice rig and daily inspections
RUNCMP Test 2-7/8"x 5" VBR, 2-7/8" fixed, and annular with 2-7/8" test
joint to 250 psi and 3500 psi for 5 charted minutes each.
RUNCMP Pull test plug and blow down lines.
RUNCMP PJSM, R/U and run 2-7/8" 6.5# EUE kill string per program.
RUNCMP Continue running 2-7/8" 6.5# EUE kill string per program.
RUNCMP Pick up UJ and make up tubing hanger and land. PU wt. 25k
DN wt. 25k. Drain stack. RILDS and torque to 450 ft. lbs.
RUNCMP R/U lines and Test 7" casing to 3500 psi for 30 charted
minutes.
RUNCMP Dry rod in TWC and test from above to 3500 psi and from
below to 1000 psi for 10 charted minutes each.
RUNCMP ND BOPE. Split stack and re-configure stack for blind shears
and 2-3/8" rams for next well. Lay out double gate rams. Lay
BOP stack over into shipping cradle.
RUNCMP NU dry hole tree, and tbg head adaptor.
RUNCMP FMC well head tech tested hanger void to 5,000 psi for 20
minutes. Tested tree with diesel ~ 5,000 psi for 10 minutes.
RUNCMP PU lubricator, Well support tech pulled TWC.
RUNCMP PJSM with L.R.S. RU LRS and test lines to 2,200 psi, pump
100 bbls diesel down tubing taking returns through the choke to
the Pits at 2 bpm / 600 psi.
RUNCMP RD LRS and blow down choke lines.
Printed: 12/18/2008 1:25:04 PM
BP EXPLORATION Page 3 of 3
Operations Summary Report
Legal Well Name: MPL-34
Common Well Name: MPL-34 Spud Date:
Event Name: WORKOVER Start: 11/26/2008 End:
Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 12/3/2008
Rig Name: NABOBS 3S Rig Number:
Date ~ From - To Hours Task ;Code NI'T Phase Description of Operations
12/3/2008 04:00 - 05:00 1.00 WHSUR P RUNCMP U-tube diesel for -1 hour. Blow down lines.
05:00 - 06:00 1.00 WHSUR P RUNCMP MU lubricator, Well support tech set BPV. Normal up tree and
cellar. Rlg released ~ 06:00.
Printed: 12/18/2008 1:25:04 PM
~"" STATE OF ALASKA
'"4/07 OIL AND GAS CONSERVATION COMMISSION
BODE Test Repcxt
Submit tcr:
Contractor: Nabors Rig No.: 3S DATE: 11/30/2008
Rig Rep.: J. Greco ! J. Fritts .Rig Phone: 659-4487 Rig Fax: 659-4486
Operator: BP Op. Phone: 653-4485 Op. Fax: 659-4628
Rep.: J.Menke ! O. Coyne
Field/Unit & Well No.: MP !- 34i PTf3 ~ 7970~ltlfl
Operation: Drlg: Workover: x
Test: Initial: x Weeky:
Test Pressure: Rams: 250/3500 Annular. 250/3500
TEST DATA,
Expior.:
Bi-Weekly
Valves: 250/3500
MISC. INSPECTIONS:
Test Result Test Result
Location Gen.: P Wei Sign P
Housekeeping: P Drl. Rig P
PTD On Location P Hazard Sec.. P
Standing Order Posted P
BOP STACK:.
Quantity Size Test Result
Annular Preventer 1 13 518 5000 P
Pipe Rams 1 4.5 P
Lower Pipe Rams 1 2'118 ~C 5 P
Blind Rams 1 Bknd P
Choke Ln. Valves 1 3118" 5000 P
HCR Valves 2 3118" 5000 P
Kilt Line Valves 1 21/16" 5000 P
Check Valve 0 NA
FLOOR SAFETY VALVES:
Quantity Test Result
Upper Kelly 0 NA
Lower Kelly 0 NA
Bad Type 2 P
Inside BOP 1 P
CHOKE MANIFOLD:
Quantity Test Result
No, Naives 13 P
Manual Chokes 1 P
Hy 'c Chokes 1 P
ACCUMULATOR SYSTEM:
Time/Pressure Test Result
System Pressure 3000 P
Prue After Closure 1500 P
MUD SYSTEM: Visual Test Alarm Test 200 psi Attained 20 sec P
Trip Tank P P FuN' Pressure Attained 3 min 15 sec P
Pit Level Indicators P P BCind Switch Covers: All stations P
Flow Indicator P P Ntign. Bottles (avg): 1900
Meth Gas Detector P P
H2S Gas Detector P P
Tes# Results
Number of Failures: 0 Test. Trine. 5 Haws
Repair or replacement of equipment w~ be maces witl~t
Inspector 659-3607, follow with written conf~mation to Supervises at:
Remarks: Tested with 4.5 test joint against Two way ctx'ck
24 HOUR NOTICE GIVEN
YES x NO
Date 11129108 Time 12:00
start 8:30 F
BOP Test (for rigs) ti ~ T_
BFL 11 /14/07 ~~ "~~~ ~ ~ ~ ~ ~ ~~~
Components tested All
days. Notify the North Slope
By Bob Noble
Witness J.Greco 1 J.Menke
Nabors 3s BOP Test MP L-34i 11-30-2008.x1s
•
~~ ~ ~
COI~TSERQ~ATIO CO1~IIII5SIO1S1T
David Reem
Engineering Team Leader
BP Exploration Alaska Inc.
PO Box 196612
Anchorage, AK 99519-6612
SARAH PAL/N, GOVERNOR
333 W. 7th AVENUE, SUITE 700
ANCHORAGE, ALASKA 99501-3539
PHONE (907) 279-1433
FAX (907) 276-7542
b~~
~~.
Re: Milne Point Unit, Kuparuk River Oil Pool, MPL-34 _
Sundry Number: 308-400
Dear Mr. Reem: 4t~~~~~ ~1~'r ;, `' 20Q
Enclosed is the approved Application for Sundry Approval relating to the
above referenced well. Please note the conditions of approval set out in the
enclosed form.
When providing notice for a representative of the Commission to witness any
required test, contact the Commission's petroleum field inspector at (907)
659-3607 (pager).
As provided in AS 31.05.080, within 20 days after written notice of this
decision, or such further time as the Commission grants for good cause
shown, a person affected by it may file with the Commission an application
for rehearing. A request for rehearing is considered timely if it is received by
4:30 PM on the 23rd day following the date of this letter, or the next working
day if the 23rd day falls on a holiday or weekend. A person may not appeal
a Commission decision to Superior Court unless rehearing has been
requested.
Sincerely,
~~~
Daniel T. Seamount, Jr.
Chair
DATED this ~ 3 day of November, 2008
Encl.
~b -
STATE OF ALASKA ~/,•s D~
~' ~~ ALA OIL AND GAS CONSERVATION CO~SION
~i ~
'~~ ~,~ APPLICATION FOR SUNDRY APPROVAL ~~~_ ~~
~~ 20 AAC 25.280 ~
1. Type Of Request: ^ Abandon ^ Suspend ^ Operation Shutdown ^ Perforate ^ Time Extension
^ Alter Casing ^ Repair Well ^ Plug Perforations ^ Stimulate ^ Re-Enter Suspended Well
^ Change Approved Program ®Pull Tubing ^ Perforate New Pool ^ Waiver ^ Other
2. Operator Name: 4. Current Well Class: 5. Permit To Drill Number
BP Exploration (Alaska) Inc. ^ Development ^ Exploratory 197-080_
3. Address: ®Service, ^ Stratigraphic 6. API Number:
P.O. Box 196612, Anchorage, Alaska 99519-6612 50-029-22766-00-00 -
7. If perforating, closest approach in pool(s) opened by this operation to nearest 8. Well Name and Number:
property line where ownership or landownership changes: MPL-34 '
Spacing Exception Required? ^ Yes ®No
9. Property Designation: 10. KB Elevation (ft): 11. Field /Pool(s): ,
ADL 025514 ~ 50.88' ~• Milne Point Unit / Kuparuk River Sands
12~ PRESENT WELL CONDITION SUM MARY
Total Depth MD (ft): Total Depth TVD (ft~: Effective Depth MD (ft): Effective Depth TVD (ft): Plugs (measured): Junk (measured):
18310' - J-~~?t23 rr/6'~18202' 7014' None None
asin Len th Size MD TVD Burst Colla se
Structural
nd or 11 20" 11 112' 1490 470
Surface 9743' 9-5/8" 9779' 4441' 5750 3090
Intermediate
Prod i n 18254' 7" 1 287' 70 7240 541
Liner
Perforation Depth MD (ft): Perforation Depth TVD (ft): Tubing Size: Tubing Grade: Tubing MD (ft):
17840' - 18024' 6707' - 6862' 4-1/2", 12.6# L-80 17514'
Packers and SSSV Type: 7" x 4-1/2" Baker'S-3' packer Packers and SSSV MD (ft): 17479'
13. Attachments: 14. Well Class after proposed work:
® Description Summary of Proposal ^ BOP Sketch
^ Detailed Operations Program ^ Exploratory ^ Development ®Service
15. Estimated Date for 16. Well Status after proposed work: ~5
r
Commencin O erations: November 10, 2008 ^ Oil ^ Gas ^ Plugged
^ Abandoned
17. Verbal Approval: Date: ®WAG ^ GINJ ^ WINJ ^ WDSPL
Commission Representative:
18. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Howard West, 564-5471
Printed Name vid Reem Title Engineering Team Leader
Prepared By NameMumber.
Signature ~~~- Phone 564-5743 Date IC 3/ Q~ Terrie Hubble, 564-4628
Commission Use Onl
Sundry Number:
Conditions of approval: Notify Commission so that a representative may witness
`.~~ ~:~4 ~~ ~~`1rC7
^ Plug Integrity (OP Test ^ Mechanical Integrity Test ^ Location Clearance
Other: 1....EO~~ ~~ ~ ~~~ ~{~~`~..
Subsequent Form Required:
APPROVED BY
A roved B COMMISSIONER THE COMMISSION Date
~ia
Form 10-403 Rued 06/2006 Submit In Duplicate
R D /t! ~~ - aB
by
Milne Point L-34i Rig Workover
Scope of Work: Pull existing 4'/z" tubing completion. Run in with --2500' of 2 7/8" L-80 EUE 8rd tubing.
MASP: 3100 psi
Well Type: Kuparuk WAG Injector
Estimated Start Date: Nov. 10, 2008
Production Engineer: Kristin Krom
Intervention Engineer: Howard West
Pre-rig prep work:
F 1 MIT-xIA to 2500 si.
S 2 Drift for 4 1/2" TTP & 'et cutter. Set 4 Y2" TTP in XN-Ni le at 17503. MIT-T to 2500 si
F 3 Circulate well with 9.8 ppg brine. Bleed off all pressures and monitor tubing for 30mins
no flow test to ensure TTP is holdin . If TTP asses NFT, continue with next ste .
E 4 Power Jet cut 4 1/2" L-80 tubing in the middle of the first full joint above the Baker
acker
F 5 CMIT TxIA to 1000 psi. Bleed off all pressures and monitor for 30mins (no flow test) to
ensure TTP and acker is holdin . If NFT asses, continue with next ste .
W 6 Check the tubing hanger lock down screws for free movement. Completely back out
and check each lock down screw for breaka a check one at a time . PPPOT-T & IC.
W 7 Set a BPV in the tubin han er.
O 8 Remove the wellhouse & flow line. Level the ad as needed for the ri .
Proposed Procedure:
1. MIRU Nabors 3S. Due to a MASP >3000 psi, a 4 ram stack will be required.
2. ND tree. NU and test BOPE to 4000 psi, test annular to 3500 psi. Stack will consist of 2 7/8" x 5"
VBRs, blind rams, 4 ~/z" fixed rams and annular preventer.
3. POOH with existing 4 ~/z" completion down to the cut.
4. Close blind rams and change 4'/z" fixed rams to 2 7/8" fixed. Test with a 2 7/8" test joint to 4000 psi.
(Two barriers are the deep tested TTP and the blind rams)
5. Run 2500' of 2 7/8" L-80, tubing.
6. Test the casing and TTP to 1000 psi for 10 minutes. Bleed off all pressures and monitor for 30mins
(no flow test) to ensure TTP and packer is holding. If NFT passes, continue with next step.
7. Freeze protect to 2200' MD w/diesel.
8. ND BOPE. Set & test BPV.
9. Install tree, test to 5000 psi.
10. RDMO.
• •
Tree: 4 1/8" - 5M CIW M PU L-34i
Wellhead: 11" 5M FMC Gen. 5 w/
11" x 4.5" FMC Tbg. Hng. , 4.5"
NSCT threads top and bottom, 4"
CIW "H" BPV profile
20" 91.1 ppf, H-40 112'
KOP @ 1000'
Max. hole angle = 81 deg. @ 6,47C
79 deg. to 81 deg. (4,100 - 14,700'
Hole angle thru' perfs = > 31 deg.
19 5/8", 40#/ft, L-80 Btrc. 9,779'
7" 26 ppf, L-80, NSCC production
casing
( drift ID = 6.151 ", cap. = 0.0383 bl
4.5" 12.6 ppf, L-80, IBT Tubing.
( drift ID = 3.958", cap.= .0152 bpf
Stimulation Summary
Perforation Summary
Ref log: 5/22/97 LWD
Size SP Interval (TVD
Shot with coil 1 15!01
2-7/8" 4 17,840'-17,860'
2-7l8" 4 17,868'-17,878'
Initial perforate ns
4.5" 5 17,906'-17,926' 6,775'-6,
4.5" 5 17,930'-17,970' 6,794'-6,
4.5" 5 18,004'-18,024' 6,858'-6,
Coil:
2-7/8" power jet, 4SPF, 60 degree, EHD
TTP= 27.7'
E-Line:
51b HJ11 Deep penetrating charges
@ 60 deg. phasing
DATE REV. BY
5 - 31 -97 MDO
11/22/97 MDO
1/15/01 M. Linder
COMMENTS
Drilled and cased by Nabors 27E
Completion Nabors 5 S
Add perfs using Coil.
Orig. KB Elev. = 52.88' (N 27E)
Orig. GL Elev. = 17.10'
RT To Tbg. Spool = 35.7' (N 27E)
iES X-Nipple (3.813"id) 17,418' I
t.5" Baker S-3 Perm pkr. 17,479' I
1ES XN-Nipple (3.725"id) 17,502'
yy~C, 17,514'
7" float collar (PBTD) 18,202'
7" float shoe 18,287'
MILNE POINT UNIT
WELL L-04
API No: 50-029-22786
• •
Tree: 2 9/16" - 5M CIW
Wellhead: 11" 5M FMC Gen. 5
4" CIW "H" BPV profile
20" 91.1 ppf, H-40 112'
2-7/8" 6.5 ppf., L-80, 8rd.
EUE tbg.
(drift ID = 2.347", Cap. = 2500,
.00579 bpf)
9 5/8", 40#/ft, L-80 Btrc. 9,779' ~
KOP @ 1000'
Max. hole angle = 81 deg. @ 6,470'
79 deg. to 81 deg. (4,100 - 14,700')
Hole angle thru' perfs = > 31 deg.
7" 26 ppf, L-80, NSCC production
casing
( drift ID = 6.151", cap. = 0.0383 bpf )
4.5" 12.6 ppf, L-80, IBT Tubing.
( drift ID = 3.958", cap.= .0152 bpf )
2-7/8" XN-Nip
4.5" HES X-Nipple (3.813"id) 17,418'
7"x 4.5" Baker S-3 Perm pkr. 17,479' I
Stimulation Summary
Perforation Summary
Ref log: 5/22/97 LWD
Size SP Interval (TVD)
Shot with coil 1 15/01
2-7/8" 4 17,840'-17,860'
2-7/8" 4 17,868'-17,878'
Initial perforate ns
4.5" 5 17,906'-17,926' 6,775'-6,791'
4.5" 5 17,930'-17,970' 6,794'-6,829'
4.5" 5 18,004'-18,024' 6,858'-6,876'
Coil:
2-7/8" power jet, 4SPF, 60 degree, EHD=.36
TTP= 27.7'
E-Line:
51b HJ11 Deep penetrating charges
B 60 deg. phasing
DATE REV. BY COMMENTS
5 - 31 -97 MDO Drilled and cased by Nabors 27E
11/22/97 MDO Completion Nabors 5 S
1115/01 M. Linder Add perfs using Coil.
M P L - 3 4 I Orig. KB Elev. = 52.88' (N 27E)
Orig. GL Elev. = 17.10'
RT To Tbg. Spool = 35.7' (N 27E)
4.5" HES XN-Nipple (3.725"id) 17,502' I
W/ 4.5" TTP Installed
WLEG 17,514'
7" float collar (PBTD) 18,202'
7" float shoe 18,287'
MILNE POINT UNIT
WELL L-34
API No: 50-029-22766
~ ~ ~ ~ BP EXPLORATION (AK) ~
Page 1 of 1
•
Maunder, Thomas E (DOA)
From: West, Howard J [Howard.West@bp.com]
Sent: Monday, November 10, 2008 7:26 AM
To: Maunder, Thomas E (DOA)
Subject: RE: MPL-34 ~80)
a~
Tom- ~ //r~.o~
My mistake- I had assumed that the Milne folk had provided you with that info. Below is what they had provided to
me.
Thanks,
Howard
Justification:
MPL-34i is a Kuparuk WAG injector which was completed in 1997 with 4.5" L-80 tubing and 7" L-80
casing. L-34 is offset to producers MPL-36 &MPL-20 (as well as possibly a KRU producer 3K-24.
However, it was not believed to provide support for those wells as was evidenced by its' high reservoir
pressure. The well was last on injection October 2006 (water), and the last gas slug was completed in
February 2006.
The long term plans for this well include re-development of the hydraulic unit. In the current location
this injector does not support any production and has no value. It will require either an ERD rig or a new
pad in order to adequately redevelop this location. Tentative plans would be to utilize the injector in it's
current location but drill a new producer within the fault block.
From: Maunder, Thomas E (DOA) [mailto:tom.maunder@alaska.gov]
Sent: Friday, November 07, 2008 2:09 PM
To: West, Howard J
Cc: Reem, David C
Subject: MPL-34 (17 )
Howard, -~_~
I am reviewing the sundry application for this well. I remember your calling about performing the work.
In the packet you submitted, there is no explanation as to why the work is being performed.
Would you please respond with some discussion of the history of the well and the reason for not recompleting?
Thanks in advance.
Tom Maunder, PE
1 I/10/2008
MEMORANDUM
e
State of Alaska
e
Alaska Oil and Gas Conservation Commission
TO:
-> .
Jim Regg \<,.;7/". {.Ie¡ (I!&
J '~i" .~ "" -
P.I. Supervisor ( { . ,
DATE: Wednesday, June 07, 2006
SUBJECT: Mechanical Integrity Tests
BP EXPLORATION (i\LASKA) INC
L·34
FROM:
Chuck Scheve
Petroleum Inspector
MILNE PT UNIT KR L-34
('/0
1..-D'O
\0\
Reviewed By:
P.I. Suprv 1f5i2-
Comm
Src: Inspector
NON-CONFIDENTIAL
Well Name: MILNE PT UNIT KR L-34 API Well Number 50-029-22766-00-00 Inspector Name: Chuck Scheve
Insp Num: mitCS060603202459 Permit Number: 197 -080-0 Inspection Date: 6/3/2006
ReI Insp Num
Packer Depth Pretest Initial 15 Min. 30 Min. 45 Min. 60 Min.
Well ! Type In¡rw'¡ TVD ... I
L·34 6408 ¡ IA 20 ! 2480 I 2480 2480
I
I iTypeTest I SPT I Test psi o---¡-o ----
P.T. I 1970800 1602 ¡ OA i ! 0 0
4YRTST Tubing I 2075 I 2075 i 2075 2075
Interval P/F F I
Notes Pretest pressures were observed and found stable. Well demonstrated good mechanical integrity.
:3CJ\N\\~E[; .rUN ~_ ~ 20n6
Wednesday, June 07, 2006
Page I of I
e
e
Alaska Oil and Gas Conservation Commission
Safety Valve System Test Report
Operator: BPX
Operator Rep: Brian Bixby
AOGCC Rep: Waived
Submitted By: Date: 12110/2005
UnitlFieldlPad: Alaska Consolidated Team/Milne PointIMPL
Separator psi: LPS HPS
_mil
Well Permit Separ Set LIP Test Test Test Date Tested and or Oil, WAG, GINJ,
Number Number PSI PSI Trip Code Code Code Passed Retest or SI GAS, CYCLE, SI
MPL-34 1970800 4500 2500 2450 P P GAS
Wells:
1 Components:
2 Failures:
o
Failure Rate:
0.00%
Remarks:
MPL-34 was recently put on gas injection. Witnessing was
waived by Jeff Jones.
~·'A~,~. k.i\J.6. I1:;:t ....
~'W11U 't1!\\1~L.>
L ~;~ ~_
(. ".7.....
Page 1
SVS MPU L 12-10-05 Mise.xls
)
)
j'v1~P u .L-·34- ¡'
'9'1. oßo
tŒCRANICAL INTEGRITY REPORT' ,
S ? U D D .~. ~:: : :s I B J 9-:¡
:. .I G 2- E l.. E;. S::: : \ q ,~ J ø¡ i
OPER & FIELD (~.p.y: )\1\:P Ù
Ì"\"ELL NUM:BER ð)"7" 08 ð .
1\4 ¡ ;u.~
/. "
::ole Size rz.' 4
. 8\1 t9
ê..na Z.
TVD¡ PETD: '.8 'Z.D 2.- MD -:¡ð2.~ TVD
TVD j DV: MD ·'Ivu
TVD¡ :CP: l·m -=~'I-D
TVTI í Set ê..t " SJ..dt '
P er£.s \ ì 90b to 18ð2.4 '
~t:,.LL DATA TD: \831ð Jill.. "tr2..~
~ oJ:t.
CasiDg: ~-9'ð L."ß'ð Shoe: ~1i'9' HD
~ (::. z.,b=t:t
~:":"1 PJ: :¡ I' }.."80 S hoe: I ß z.ß=1 ' 1--ill
, 2..bð.
:- ubi:; g : .t.J BIz, 1. "~op a c k e!:" i i 4:¡' ., B till
è£C?.Þ.NIC:'..L INTEGRITY - ?.tlliT ¡ 1
Annulus Press Test: ~?
15 m~n
30 min
COffi!Ilents:
-----
MECHJÜ-1ICP...L INTEGRITY - P.ART /2
"
C VI .~ ..,.."Ï r
ement 0 urnes:' r...mt. l...~r ~J3~ 6
qao ~~ .pf'E:..
I-¿SO ~y.. 6
Cs g )ð40 -:5~ Pf€.i DV
Cwt 701 to cove~ Der=s
Iß 'S~ J~. b . -::¡. , . -4\, 3
z~ -::. 3t IJ-f tI82ð9-iB202.JX.I~3.fo +L\%~10 ..)ß281JX.33b8 + lr~?.87 ~ 11qObJ~.Jo83 ~ ?4. b_ '5)(
'2. ':·~"'54:,~"S)I./¡,..~ . .
~ 8~2-: 'Ibeore tical Toe
· \oß~ 9-hr
\'1O}Ob -
11~~1
Î! ~S~ ;.. b+, to
L---
CemeTIt Bond Log (Yes or
No) 'lÐ
.J :- .1083 J'" ! b L b "1
-
In AOGCC File . ~& L-
CEL ~valuationT =one ~Dove perfs
~bbE:-Ð tNT~L.: ~tDO' '-1131 (~', ADtQÙf't'{~. P,P,\.ID 1Ì5D\ff.. ~'f:S
J
?rociuc..tion Log: Type
i Eva.luation
CONCLJSIONS:
5CANNED DEG 1 4 2005
:J-~-
_ d...J... L..
if 1 :
? ~r:: f. Z : \l\ \ \ 'S '/"II 0 i r A ë f:,J\
WJII) 31819'4
i I
~ Cc£,,-,---:J 'k9-?/l1 \) [\,-\-0 ç-
MEMORANDUM
State of Alaska
Alaska Oil and Gas Conservation Commission
TO' Camille O. Taylor (~-~ DATE: May 14, 2002
Chair
' ¢~ _~JBJECT:o~~_~1_ Mechanical Integrity Tests
THRU' Tom Maunder ~ BPX
P.I. Supervisor~'f¢~'''t~ ~"~5;~ MPU B-25, F-41,J-17, L-34
FROM: John Crisp Milne Point Field
Petroleum Inspector Milne Point Unit
NON- CONFIDENTIAL
WellJ B-25
P.T.a.i .,1853020
Notes:
P.T;D.I 1970950,
Notes!
Well
P.T.D.
,,,
Notes:
' Wel!J L-34
P.T.D:I ' 1~)70800
Notes:
1972080
,,
' ' Packer Depth " PreteSt initial 15 Min 30 Min. '"
Type lnj.'J" N J"'T.V.'D. J 7032 JTubingj 2600 J 2600 J' 2600 J ~600 J'ln:tervaiJ" 4
:rypete, stj p J.Te,tp,iJ 20oo J, Casing j,,,650 ,j 20o0J ~,990 j ~9% j,,P/F J P
Type inj.I N "! T.V:D. ! '~590 I Tubing! !' ! ! Iinterva'] 4
Typetest] P, ]TestpsiJ ...... ~500 lCasingi ,59o 1~5~0 '!'r ~4'~0 j i460'! P/F
[ P
Type Inj.'J 'S J T.V.D. J 3432' J Tubing 'j 1250 J 1250 J 1250 J i250 I lnterVa~J '4'"
Type testJ P J TeStpSiJ '~500 JCasin,gJ 360,I s.o i 5oo ! I P/F, I-"'
Type lnjlJ N iT'V'D' I64°8 '! Tubing J 780 J 840 J '~B40 ! 840' 'i'nterva~J 4
Type tesil P JTes't'psiI 1700' ,Jca'singJ I ~7oo J '~e~o, I ~66o I P/F I _P-~
Type INJ. Fluid Codes
F = FRESH WATER INJ.
G = GAS INJ.
S = SALT WATER INJ.
N = NOT INJECTING
Type Test
M= Annulus Monitoring
P= Standard Pressure Test
R= Internal Radioactive Tracer Survey
A= Temperature Anomaly Survey
D= Differential Temperature Test
Test's Details
I traveled to BP's Milne Point Field to witness MIT's. No Failures witnessed.
Interval
I= Initial Test
4= Four Year Cycle
V= Required by Variance
W= Test during Workover
O= Other (describe in notes)
M.I.T.'s performed' 4 Number of Failures: 0_
Attachments:
Total Time during tests: 8 hrs.
cc'
MIT report form
5/12/00 L.G.
SCANNED' JUN ~4 7_007_
MIT BPX MPU 05-14-02jc.xls
5/16/02
01'4 OR BEFORE
C:LORlXM1~][~LM'DOC
STATE OF ALASKA ...
ALASK, :L AND GAS CONSERVATION COM ,SION
REPORT OF SUNDRY WELL OPERATIONS
1. Operations performed: [] Operation Shutdown [] Stimulate [] Plugging [] Perforate
[] Pull Tubing [] Alter Casing [] Repair Well [] Other Add Perfs
2. Name of Operator 5. Type of well: 6. Datum Elevation (DF or KB)
BP Exploration (Alaska) Incl [] Development KBE = 50.88'
[] Exploratory 7. Unit or Properly Name
3. Address [] Stratigraphic Milne Point Unit
P.O. Box 196612, Anchorage, Alaska 99519-6612 [] Service
4. Location of well at surface 8. Well Number
3284' NSL, 5106' WEL, SEC. 8, T13N, R10E, UM MPL-34i
At top of productive interval 9. Permit Number / Approval No.
197-O8O
3469' NSL, 5104' WEL, SEC. 24, T13N, R9E, UM 10. APl Number
At effective depth 50-029-22766
3371' NSL, 5225' WEL, SEC. 24, T13N, R9E, UM 11. Field and Pool
At total depth ° Milne Point Unit / Kuparuk River
3336' NSL, 5266' WEL, SEC. 24, T13N, R9E, UM Sands
12. Present well condition summary
Total depth: measured 18310 feet Plugs (measured)
true vertical 7123 feet
Effective depth: measured 18202 feet Junk (measured)
true vertical 7029 feet
Casing Length Size Cemented M D TVD
Structural
Conductor 112' 20" 250 sx Arcticset I (Approx.) 112' 112'
Surface 9743' 9-5/8" 900 sx PF 'E'. 1250 sx 'G', 9779' 4442'
Intermediate
Production 18254' 7" 253 sx Class 'G' 18287' 7103'
Liner
Perforation depth: measured 17906' - 17926'; 17930' - 17970'; 17980' - 18000'; 18004' - 18024'
true vertical 6762' 6779'; 6783' 6816'; 6825' 6842'; 6845' 6862' ~'.'.'~
Tubing (size, grade, and measured depth) 4-1/2", 12.6#, L-80, 17514'
Packers and SSSV (type and measured depth) Packer 17479
13. Stimulation or cement squeeze summary See Attachment
Intervals treated (measured)
Treatment description including volumes used and final pressure
14. Representative Daily Average Production or Iniection Data
OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure
Prior to well operation:
Subsequent to operation:
15. Attachments 16. Status of well classifications as:
[] Copies of Logs and Surveys run
[] Oil [] Gas [] Suspended Service Miscible Injector
[] Daily Report of Well Operations
17. I hesignedreby ce rtiMichael Williamsfyth at the fo~.,,~~ re going is true and c.grre_ ~//~//". _ ct to the bestTitle of mYTechnicalknowledgeAssistant III Date ~///,~~/
i: 7,:i" : : :: : Prepared By Name/Number: /'DeW~4yne Schnorr564-5174
: ~ , ., , ~ 1_.__~_~'~.
Form 10-404 Rev. 06/15/88
Submit In Duplicate
01/15/2001
MPL-34
DESCRIPTION OF WORK COMPLETED
NRWO OPERATIONS
PERF(ADD-PERF): ADD PERF- 3 DAYS
SUMMARY
LOCATE XN NIPPLE AT 17472' CTMD. CORRECTED TO 17544' PER
PROGRAM (DEPTH DISCREPANCY BETWEEN MWD, GR/CCL AND TBG
TALLY). FLAG PIPE. POOH TO PU 10' PERF GUN. RIH, CORRECT TO FLAG.
PERFORATE 17868' TO 17878' WITH 2-7/8" POWER JETS, 4 SPF. POH. LAY
DOWN PERF GUN. PU 20' GUN. RIH. PERFORATE 17840' TO 17860' W/2-
7/8" POWERJET 4 SPF. POOH. LD GUN. RIG DOWN
LD MHA. RD
Fluids Pumped
BBLS. Description
567 2% KCL + J313
140 60/40 METHANOL
707 Total
ADD PERFS
01/15/2001
SUMMARY
The following intervals were perforated using SWS 2-7/8" POWER JETS, 4 SPF.
17,840' - 17,860' MD
17,868' - 17,878' MD
:f
MEMORANDUM
TO:
THRU:
FROM:
Julia Heusser,
Commissioner
Tom Maunder, ~'l~q~4~
P. i. Supervisor ~x,.c_~,
John Crisp,
Petroleum InSpeCtor
State of Alaska
Alaska Oil and Gas Conservation Commission
DATE:
SUBJECT:
December 22, 2000
Safety Valve Tests
Milne Point Field
L Pad
December 221 2000.: I traveled to BPX's Milne Point Field L Pad to witness
Safety Valve System tests. I conducted wellhouse inspections during SVS tests.
Larry Niles was BP rep. in charge of SVS testing. As usual, Larry was ready to
begin testing as soon as I arriVed on location. Wellhouses on L Pad are heated &
have lights, this makes for safe wOrking conditions & minimal SVS failures.
Wellhouses are clean~& in good condition. The ^OGCC test report is attached
for SVS failure reference.
SUMMARY: I traveled to BPX MPU L Pad for SVS tests.
20 wells, 40 components tested. 1 Failure witnessed. 2.5% failure rate.
20 wellhouseS inspected. No failures to report.
Attachments: SVS MPU L pad 12-22-00jc
CC;
,NON-CONFIDENTIAL
SVS MPU L Pad 12-22-OOjc.doc
Alaska Oil and Gas Conservation Commission
Safety Valve System Test Report
Operator: BPX Submitted By: John Crisp Date: 12/22/00
Operator Rep: Larry Niles Field/Unit/Pad: PBU MPU L Pad
AOGCC Rep: John Crisp Separator psi: LPS 140 HPS
Well Permit Separ Set L/P Test Test Test Date
Oil, WAG, GIN J,
Number Number PSI PSI Trip Code Code Code Passed GAS or CYCLE
L-01 1840050
i~-02 1900060 140 100 90 P P OIL
L-03 1900070
L-04 1900380 140 100 105P P OIL
L-05 1900390 140 100 106' P P OIL
'L-06 1900100 140 100 100 P P OIL
L-07 1900370 140100 100 P P OIL:
L-08 1901000 4000 2000 195~ ' P P WAG!
L-09 19010t0~
L-11 1930130 , -140 100 115 'P P OIL
L-12 1930110! 1~0 100! 100 P P oIL
L-13 1930120 140 1001 100! P P OIL
L-14 1940680 140 100! 95! P P OIL
L-15 i.'1940620
L-16A 1990900
L-17 1941690
L-20 1971360 140 100 100 P P OIL
L-25 1951800 140 100 105 P P OIL
L-28A 1982470 140 100 110 P P. OIL
L-29 1950090 140 : 100 95 P P OIL
I
L-32 . 1970650 140 100 100 P P OIL
L-33 1971050
L-35 1970920 140 100 ' 105 P P OIL
L-36 1971480 ' 140 100 105 P P OIL
,,
L-37A. 1980560
L-40 1980100 140 100 100 P P ~\~ ~ -k~ ~ \'~ OIL
L-45 1981690 140 100 105 P P [x~' OIL
L-34 1970800 4600 2000 1900 P 4 WAG
Wells: 20 Components: 40 Failures: 1 Failure Rate: 2.5% [390
Remarks:
2126/00
page 1 of 2
SVS MPU L Pad 12-22-00jc.xls
Well Permit Separ Set L/P Test Test Test Date
Oil, WAG, GIN J,
Number Number PSI PSI Trip Code Code Code Passed GAS or CYCLE
i
Page 2 of 2
SVS MPU L Pad 12-22-00jc.xls
AOGCC Geological Materials Inventory
PERMIT 9 %080 BP EXPLORATION
Log Data Sent Received
7771 ~'~WA GR MARKED LINE 8/8/1997 8/12/1997
7784 ~ SCHLUM CDR/ADN 8/21/1997 8/22/1997
ADN-MD d~/- 9800-17920 8/21/1997 8/22/1997
ADN-TVD '..L~' 4450-7100 8/21/1997 8/22/1997
CDR-MD ~ 7200-18290 8/21/1997 8/22/1997
CDR-TVD ~ 3950-7100 8/21/1997 8/22/1997
GR/CCL ~,/ 17730-17950 11/20/1997 11/24/1997
GYRO MULTISHOT ~ GYRODATA CSNG 0-18100C 3/3/1999 3/3/1999
GYRO MULTISHOT ~ GYRODATA DRLPIPE 0-10770 3/3/1999 3/3/1999
INJP ,-C''''~ 11200-18150 12/31/1998 1/4/1999
SBL/GR/CCL ~ 9700-18118 7/11/1997 7/15/1997
SRVY RPT ~ SCHLUM 0-18310 3/3/1999 3/3/1999
~1~-407 CompletionDate l (/[ "l/c[ ~ Dailywellops .f~/ ~/~ :7 ~
Are dry ditch samples required? yes ~ no And received? ,---~-~~ no
Was the well cored? yes ~ no Analysis _description received?
yes .,~.-no Received? -- es~._ no
Initial
Are tests required?
Well is in compliance
Comments
Box
no
Wednesday, October 13, 1999 Page 1 of 1
,,
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
WELL COMPLETION OR RECOMPLETION REPORT AND LOG
1. Status of Well Classification of Service Well
[] Oil [] Gas []Suspended []Abandoned []Service Miscible Injector
2. Name of Operator 7. Permit Number
BP Exploration (Alaska)Inc. 97-80
3. Address 8. APl Number
P.O. Box 196612, Anchorage, Alaska 99519-6612 50-029-22766
4. Location of well at surface ~ .................. _ ....... 9. Unit or Lease Name
3284' NSL, 5106' WEL, SEC. 8, T13N, R10E, UM
~':~.'~i~ Milne Point Unit
i ...... '~ .- ........ 4.,;~ ¢ 10. Well Number
At top of productive interval
~ (' MPL-34i
3469' NSL, 5104' WEL, SEC. 24, T13N, R9E, UM . ~'~ _
At totaldepth i ~~i~''' i ~:':'. 11. Field and Pool
3336' NSL, 5266' WEL, SEC. 24, T13N, R9E, UM -
Milne Point Unit / Kuparuk River
5. Elevation in feet (indicate KB, DF, etc.) 16. Lease Designaiisn and Serial No. Sands
KBE = 50.88'I ADL 025514
18310 7123 FTI 18202 7029 FTI [~Yos [] No N/A MD 1800' (Approx.)
22. Type Electric or Other Logs Run
MWD, CDR, GR, DWOB, DTOQ, DIR
23. CASING~ LINER AND CEMENTING RECORD
CASING SETTING DEPTH HOLE
SIZE WT. PER FT. GRADE TOP BO-I-rOM SIZE CEMENTING RECORD AMOUNT PULLED
20" 91.1# H-40 Surface 112' 24" _~50 sx Arcticset I (Approx.)
9-5/8" 40# L-80 36' 9779' 12-1/4" ~)00 sx PF 'E', 1250 sx 'G', 1040 sx PF 'E'
7" 26# L-80 33' 18287' 8-1/2" 253 sx Class 'G'
24. Perforations open to Production (MD+TVD of Top and 25. TUBING RECORD
Bottom and interval, size and number) SizE DEPTH SET (MD) PACKER SET (MD)
4-1/2" Gun Diameter, 5 spf 4-1/2", 12.6#, L-80 17514' 17479'
MD TVD MD TVD
17906' - 17926' 6762' - 6779'
17930' - 17970' 6783' - 6816' _26. ACID, FRACTURE, CEMENT SQUEEZE, ETC.
17980' - 18000' 6825' - 6842' DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED
18004' - 18024' 6845' - 6862'
Freeze Protect with 60 Bbls of Diesel (N-27E)
Freeze Protect with 75 Bbls of Diesel (N-5S)
27. PRODUCTION TEST
Date First Production I Method of Operation (Flowing, gas lift, etc.)
March 22, 1998I Miscible In'ector
iDate of Test Hours Tested PRODUCTION FOR OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE IGAs-OIL RATIO
TEST PERIOD
I
Flow Tubing Casing Pressure CALCULATED OIL-DEL GAS-MCF WATER-BEE OIL GRAVITY-APl (CORR)
Press. 24-HOUR RATE
28. CORE DATA
Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips.
Form 10-407 Rev. 07-01-80 Submit In Duplicate
29. Geologic Markers 30. Formation Tests
Measured True Vertical Include interval tested, pressure data, all fluids
Marker Name Depth Depth recovered and gravity, GOR, and time of each phase.
TKLB 17472' 6402'
TKUD 17661' 6558'
:TKUC 17798' 6672'
TKA3 17905' 6762'
TKA2 17930' 6783'
TKA1 17977' 6822'
TM LV 18024' 6862'
31. List of Attachments
Summary of Daily Drilling Reports, Surveys
32. I hereby certify that the f~egoing_-~ J," is true and correct to the best of my knowledge (~(~
Signed Terrie Hubble ~ ~ f~~_, ~,~ _ _.~~ Title Technical Assistant III Date 0 '~'P~'
MPL-34i 97-80 Prepared By Name/Number: Terrie Hubble, 564-4628
Well Number Permit No. / Approval No.
INSTRUCTIONS
GENERAl..' This form is designed for submitting a complete and correct well completion report and Icg on all types of lands and
leases in Alaska.
ITEM 1-' Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water
supply for injection, observation, injection for in-situ combustion.
ITEM 5-' Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces
on this form and in any attachments.
ITEM 16 AND 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item
16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional
interval to be separately produced, showing the data pertinent to such interval.
ITEM 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.).
ITEM 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of
the cementing tool.
ITEM 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In,
Other-explain.
ITEM 28: If no cores taken, indicate 'none'.
Form 10-407 Rev. 07-01-80
Operator BP Exploration
Performance Enquiry Report
Date 01:13,11Feb 99
Formation Integrity Test for MPL-34
Page
The analysis is from - 02:30, 16 May 97 - to - 02:30, 16 May 97
Programs in Result Table: MPL-34 Drill and Complete
Well Type Time From Time To Duration Description E.M.W.(equivalent mud weight)
MPL-34 Event 02:30, 16 May 97 02:30, 16 May 97 0 hr 0 min Obtained leak off 13.2
Depth MDR
10317.5
Hole Size MDR
8-1/2
Facility
M Pt L Pad
Progress Report
Well MPL-34
Rig Nabors
Page
Date
1
10 February 99
Date/Time
06 May 97
07 May 97
08 May 97
09 May 97
10 May 97
11 May 97
12 May 97
10:00-14:00
14:00-14:30
14:30-23:00
23:00-04:30
04:30-06:00
06:00-06:30
06:30-10:00
10:00-16:30
16:30-18:00
18:00-18:30
18:30-20:00
20:00-20:30
20:30-03:30
03:30-04:30
04:30-06:00
06:00-06:30
06:30-07:00
07:00-18:00
18:00-18:30
18:30-03:30
03:30-04:00
04:00-04:30
04:30-05:00
05:00-06:00
06:00-06:30
06:30-14:30
14:30-15:00
15:00-16:30
16:30-17:00
17:00-18:00
18:00-18:30
18:30-06:00
06:00-06:30
06:30-10:00
10:00-11:00
11:00-12:00
12:00-13:00
13:00-14:00
14:00-18:00
18:00-18:30
18:30-06:00
06:00-06:30
06:30-07:30
07:30-10:30
10:30-12:00
12:00-13:00
13:00-14:30
14:30-18:00
18:00-18:30
18:30-06:00
06:00-06:30
06:30-12:00
12:00-13:00
13:00-13:30
Duration
4hr
1/2 hr
8-1/2 hr
5-1/2 hr
1-1/2 hr
1/2 hr
3-1/2 hr
6-1/2 hr
1-1/2 hr
1/2 hr
1-1/2 hr
1/2 hr
7hr
lhr
1-1/2 hr
1/2 hr
1/2 hr
llhr
1/2 hr
9hr
1/2 hr
1/2 hr
1/2 hr
lhr
1/2 hr
8hr
1/2 hr
1-1/2 hr
1/2 hr
lhr
1/2 hr
11-1/2 hr
1/2 hr
3-1/2 hr
lhr
lhr
lhr
lhr
4hr
1/2 hr
11-1/2 hr
1/2 hr
lhr
3hr
1-1/2 hr
lhr
1-1/2 hr
3-1/2 hr
1/2 hr
11-1/2 hr
1/2 hr
5-1/2 hr
lhr
1/2 hr
Activity
Rigged down High pressure lines
Held safety meeting
Rig moved 50.00 %
Rig moved 90.00 %
Rigged up Fluid system
Held safety meeting
Rigged up Fluid system
Rigged up Divertor
Serviced Top drive
Held safety meeting
Serviced Additional services
Tested Divertor
Racked back Drillpipe
Serviced Block line
Made up BHA no. 1
Held safety meeting
Cleared Flowline
Drilled to 1045.5 ft
Held safety meeting
Drilled to 2332.5 ft
Circulated at 2332.5 ft
Pulled out of hole to 1085.5 ft
R.I.H. to 2332.5 ft
Drilled to 2428.5 ft
Held safety meeting
Drilled to 3827.5 ft
Circulated at 3827.5 ft
Pulled out of hole to 1470.5 ft
Serviced Top drive
R.I.H. to 3827.5 ft
Held safety meeting
Drilled to 5326.5 ft
Held safety meeting
Drilled to 5607.5 ft
Circulated at 5607.5 ft
Pulled out of hole to 1753.5 ft
Serviced Top drive
R.I.H. to 5607.5 ft
Drilled to 6074.5 ft
Held safety meeting
Drilled to 7197.5 ft
Held safety meeting
Circulated at 7197.5 ft
Pulled out of hole to 1000.5 ft
Pulled BHA
Serviced Top drive
Made up BHA no. 2
R.I.H. to 7197.5 ft
Held safety meeting
Drilled to 8191.5 ft
Held safety meeting
Drilled to 8751.5 ft
Circulated at 8751.5 ft
Pulled out of hole to 7230.5 ft
Progress Report
Facility M Pt L Pad
Well MPL-34
Rig Nabors ~f~
Page 2
Date 10 February 99
Date/rime
13:30-14:00
14:00-14:30
14:30-18:00
18:00-18:30
18:30-06:00
13 May 97 06:00-06:30
06:30-07:00
07:00-08:30
08:30-12:00
12:00-13:00
13:00-13:30
13:30-16:30
16:30-18:30
18:30-22:00
22:00-23:30
23:30-00:30
14 May 97 00:30-06:00
06:00-08:30
08:30-09:00
09:00-10:30
10:30-11:45
11:45-14:00
14:00-17:30
17:30-19:00
19:00-21:00
21:00-23:30
23:30-01:00
15 May 97 01:00-04:00
04:00-06:00
06:00-11:30
11:30-12:00
12:00-13:00
13:00-15:30
15:30-16:00
16:00-16:30
16:30-22:30
22:30-23:30
23:30-01:00
16 May 97 01:00-02:00
02:00-02:30
02:30-06:00
06:00-12:30
12:30-14:00
14:00-14:30
14:30-15:00
15:00-15:30
15:30-16:30
16:30-23:00
23:00-06:00
17 May 97 06:00-21:00
21:00-22:30
22:30-00:30
18 May 97 00:30-02:00
02:00-02:30
Duration
1/2 hr
1/2 hr
3-1/2 hr
1/2 hr
11-1/2 hr
1/2 hr
1/2hr
1-1/2 hr
3-1/2 hr
lhr
1/2 hr
3hr
2hr
3-1/2 hr
1-1/2 hr
lhr
5-1/2 hr
2-1/2 hr
1/2 hr
1-1/2 hr
1-1/4 hr
2-1/4 hr
3-1/2 hr
1-1/2 hr
2hr
2-1/2 hr
1-1/2 hr
3hr
2hr
5-1/2 hr
1/2hr
lhr
2-1/2 hr
1/2 hr
1/2 hr
6hr
lhr
1-1/2 hr
lhr
1/2 hr
3-1/2 hr
6-1/2 hr
1-1/2 hr
1/2 hr
1/2 hr
1/2 hr
lhr
6-1/2 hr
7hr
15hr
1-1/2 hr
2hr
1-1/2 hr
1/2 hr
Activity
Serviced Top drive
R.I.H. to 8751.5 ft
Drilled to 8971.5 ft
Held safety meeting
Drilled to 9781.5 ft
Held safety meeting
Drilled to 9800.5 ft
Circulated at 9800.5 ft
Pulled out of hole to 560.5 ft
Serviced Block line
Serviced Top drive
R.I.H. to 9800.5 ft
Circulated at 9800.5 ft
Pulled out of hole to 560.5 ft
Pulled BHA
Serviced Casing handling equipment
Ran Casing to 7745.5 ft (9-5/8in OD)
Ran Casing to 9779.5 ft (9-5/8in OD)
Rigged up Cement head
Circulated at 9779.5 ft
Mixed and pumped slurry - 348.000 bbl
Mixed and pumped slurry - 256.000 bbl
Circulated at 2033.5 ft
Mixed and pumped slurry - 402.000 bbl
Serviced Surface lines
Rigged down Divertor
Installed Adapter spool
Rigged up BOP stack
Tested BOP stack
Tested BOP stack
Installed Wear bushing
Serviced Top drive
Made up BHA no. 3
R.I.H. to 2033.5 ft
Drilled installed equipment - DV collar
R.I.H. to 9693.5 ft
Tested Casing
Drilled installed equipment - Landing collar
Circulated at 9820.5 ft
Performed formation integrity test
Drilled to 10317.5 ft
Drilled to 11163.5 ft
Circulated at 11163.5 ft
Pulled out of hole to 9779.5 ft
Serviced Top drive
R.I.H. to 11163.5 ft
Circulated at 11163.5 ft
Took Gyro multi-shot w/line survey
Drilled to 12098.5 ft
Drilled to 14162.5 ft
Circulated at 14162.5 ft
Pulled out of hole to 9779.5 ft
Serviced Top drive
R.I.H. to 10365.5 ft
Facility
M Pt L Pad
Progress Report
Well MPL-34
Rig Nabors I~
Page
Date
3
10 February 99
Date/Time
19 May 97
20 May 97
21 May 97
22 May 97
23 May 97
24 May 97
02:30-03:30
03:30-05:00
05:00-06:00
06:00-21:30
21:30-23:00
23:00-00:00
00:00-00:30
00:30-06:00
06:00-21:30
21:30-23:30
23:30-01:00
01:00-02:00
02:00-06:00
06:00-06:30
06:30-08:00
08:00-15:00
15:00-17:00
17:00-18:00
18:00-18:30
18:30-22:30
22:30-01:00
01:00-04:30
04:30-05:30
05:30-06:00
06:00-06:30
06:30-10:30
10:30-15:00
15:00-18:00
18:00-19:30
19:30-23:00
23:00-00:00
00:00-04:00
04:00-04:30
04:30-06:00
06:00-22:00
22:00-22:30
22:30-04:30
04:30-06:00
06:00-07:00
07:00-08:00
08:00-10:00
10:00-11:30
11:30-13:00
13:00-16:00
16:00-20:30
20:30-06:00
06:00-08:30
Duration
lhr
1-1/2 hr
lhr
15-1/2 hr
1-1/2 hr
lhr
1/2 hr
5-1/2 hr
15-1/2 hr
2hr
1-1/2 hr
lhr
4hr
1/2 hr
1-1/2 hr
7hr
2hr
lhr
1/2 hr
4hr
2-1/2 hr
3-1/2 hr
lhr
1/2 hr
1/2 hr
4hr
4-1/2 hr
3hr
1-1/2 hr
3-1/2 hr
lhr
4hr
1/2 hr
1-1/2 hr
16hr
1/2 hr
6hr
1-1/2 hr
lhr
lhr
2hr
1-1/2 hr
1-1/2 hr
3hr
4-1/2 hr
9-1/2 hr
2-1/2 hr
Activity
Took MWD survey at 10270.5 ft
R.I.H. to 14162.5 ft
Drilled to 14260.5 ft
Drilled to 16160.5 ft
Circulated at 16160.5 ft
Pulled out of hole to 13785.5 ft
R.I.H. to 16160.5 ft
Drilled to 16628.5 ft
Drilled to 17657.0 ft
Circulated at 17657.0 ft
Pulled out of hole to 14807.0 ft
R.I.H. to 17657.0 ft
Drilled to 17910.0 ft
Drilled to 17998.0 ft
Monitor wellbore pressures
Circulated closed in well at 17998.0 ft
Circulated at 17998.0 ft
Pulled out of hole to 16349.0 ft
R.I.H. to 17998.0 fl
Drilled to 18310.0 ft
Circulated at 18310.0 ft
Pulled out of hole to 9779.0 ft
Serviced Block line
Serviced Top drive
Serviced Top drive
R.I.H. to 18310.0 ft
Circulated at 18310.0 ft
Pulled out of hole to 10417.0 ft
Took MWD survey at 10370.0 ft
Pulled out of hole to 629.0 ft
Serviced BOP stack
Pulled BHA
Removed Wear bushing
Rigged up Casing handling equipment
Ran Casing to 18287.0 ft (7in OD)
Rigged up Cement head
Circulated at 18287.0 ft
Mixed and pumped slurry - 52.000 bbl
Mixed and pumped slurry - 52.000 bbl
Tested Casing
Serviced Casing handling equipment
Installed Wellhead integral components
Serviced Handling equipment
Removed BOP stack
Installed Xmas tree primary components
Laid out 5in drill pipe from derrick
Laid out 5in drill pipe from derrick
Facility
M Pt L Pad
Progress Report
Well MPL-34 Page 1
Rig ~ ~/~ ~ Date 10 February 99
Date/Time
06 Nov 97
07 Nov 97
08 Nov 97
09 Nov 97
10 Nov 97
11 Nov 97
12 Nov 97
13 Nov 97
06:00-23:00
23:00-03:00
03:00-06:00
06:00-08:00
08:00-14:00
14:00-18:00
18:00-01:00
01:00-03:00
03:00-04:00
04:00-05:00
05:00-06:00
06:00-12:00
12:00-18:00
18:00-01:30
01:30-02:00
02:00-06:00
06:00-14:00
14:00-16:00
16:00-16:30
16:30-18:00
18:00-19:00
19:00-22:00
22:00-00:30
00:30-01:00
01:00-01:30
01:30-03:30
03:30-06:00
06:00-11:00
11:00-12:00
12:00-14:30
14:30-20:00
20:00-00:00
00:00-01:30
01:30-06:00
06:00-07:00
07:00-12:00
12:00-12:30
12:30-15:30
15:30-16:00
16:00-02:00
02:00-03:00
03:00-04:00
04:00-05:30
05:30-06:00
06:00-07:30
07:30-08:30
08:30-13:30
13:30-18:00
18:00-19:00
19:00-23:00
23:00-00:00
00:00-01:00
01:00-03:00
03:00-06:00
Duration
17 hr
4hr
3hr
2hr
6hr
4hr
7hr
2hr
lhr
lhr
lhr
6hr
6hr
7-1/2 hr
1/2 hr
4hr
8hr
2hr
1/2 hr
1-1/2 hr
lhr
3hr
2-1/2 hr
1/2 hr
1/2 hr
2hr
2-1/2 hr
5hr
lhr
2-1/2 hr
5-1/2 hr
4hr
1-1/2 hr
4-1/2 hr
lhr
5hr
1/2 hr
3hr
1/2 hr
10hr
lhr
lhr
1-1/2 hr
1/2 hr
1-1/2 hr
lhr
5hr
4-1/2 hr
lhr
4hr
lhr
lhr
2hr
3hr
Activity
Rig moved 100.00 %
Removed Xmas tree
Installed BOP stack
Tested Well control
Worked on BOP - Blind ram
Worked on BOP - Blind ram
Tested BOP stack
Installed Tubing handling equipment
Rigged up Tubing handling equipment
Installed Tubing handling equipment
Made up BHA no. 1
Installed TCP
Ran Tubing to 2235.0 ft (2-7/8in OD)
Ran Tubing to 8000.0 ft (2-7/8in OD)
Serviced Service lines
Ran Tubing to 11500.0 ft (2-7/8in OD)
Ran Tubing to 18030.0 ft (2-7/8in OD)
Rigged up sub-surface equipment - Slickline / braided cable
Rig waited · Equipment
Conducted electric cable operations
Rig waited · Materials
Conducted electric cable operations
Conducted electric cable operations
Laid down 93.0 ft of Tubing
Held safety meeting
Perforated
Tested Mechanical firing head - Via annulus and string
Rig waited · Materials
Circulated at 17900.0 ft
Filter Brine
Circulated at 17900.0 ft
Fill pits with Brine
Circulated at 17900.0 ft
Fill pits with Brine
Fill pits with Brine
Circulated at 17900.0 ft
Investigated pressure change
Circulated at 17900.0 ft
Investigated pressure change
Pulled Tubing in stands to 0.0 ft
Laid down 135.0 ft of Tubing
Rigged down sub-surface equipment - Gun assembly
Rigged down sub-surface equipment - Gun assembly
Rigged up Tubing handling equipment
Made up BHA no. 1
Repaired Tubing handling equipment
R.I.H. to 11529.0 ft
R.I.H. to 17543.0 fi
Reverse circulated at 17543.0 fi
Reverse circulated at 18088.0 ft
Reverse circulated at 18088.0 ft
Pulled out of hole to 17917.0 ft
Circulated at 17917.0 ft
Pulled out of hole to 14000.0 ft
Facility
M Pt L Pad
Progress Report
Well MPL-34
Page
Date
2
10 February 99
Date/Time
14 Nov 97
15 Nov 97
16 Nov 97
17 Nov 97
06:00-07:00
07:00-07:30
07:30-11:00
11:00-21:00
21:00-23:00
23:00-06:00
06:00-08:00
08:00-10:00
10:00-10:30
10:30-14:00
14:00-22:00
22:00-23:30
23:30-05:30
05:30-06:00
06:00-09:00
09:00-18:00
18:00-20:00
20:00-01:00
01:00-02:30
02:30-05:30
05:30-06:00
06:00-06:30
06:30-09:30
09:30-10:30
10:30-12:30
12:30-13:30
13:30-14:30
14:30-16:30
16:30-23:30
23:30-01:00
01:00-01:15
01:15-03:30
03:30-06:00
06:00-10:30
10:30-12:30
12:30-13:30
13:30-14:30
14:30-17:00
Duration
lhr
1/2 hr
3-1/2 hr
10hr
2hr
7hr
2hr
2hr
1/2 hr
3-1/2 hr
8hr
1-1/2 hr
6hr
1/2 hr
3hr
9hr
2hr
5hr
1-1/2 hr
3hr
1/2 hr
1/2 hr
3hr
lhr
2hr
lhr
lhr
2hr
7hr
1-1/2 hr
1/4 hr
2-1/4 hr
2-1/2 hr
4-1/2 hr
2hr
lhr
lhr
2-1/2 hr
Activity
Pulled out of hole to 10000.0 ft
Serviced Tubing handling equipment
Pulled out of hole to 9000.0 ft
Repaired Tubing handling equipment
Serviced Block line
Pulled out of hole to 1200.0 ft
Pulled BHA
Installed Internal BOPs
Installed BOP stack
Tested All functions
Ran Tubing to 0.0 ft (4-1/2in OD)
Ran Tubing to 30.0 ft (4-1/2in OD)
Ran Tubing to 4920.0 ft (4-1/2in OD)
Repaired Tubing handling equipment
Ran Tubing to 0.0 ft (4-1/2in OD)
Ran Tubing to 9600.0 ft (4-1/2in OD)
Ran Tubing to 0.0 ft (4-1/2in OD)
Ran Tubing to 14500.0 ft (4-1/2in OD)
Ran Tubing to 0.0 ft (4-1/2in OD)
Ran Tubing to 17512.0 ft (4-1/2in OD)
Installed Completion string handling equipment
Held safety meeting
Installed Tubing hanger
Installed Hanger plug
Removed BOP stack
Installed Xmas tree
Tested Xmas tree
Retrieved Hanger plug
Reverse circulated at 17513.0 fi
Freeze protect well - 75.000 bbl of Diesel
Held safety meeting
Tested Hydraulic packer
Circulated at 17513.0 ft
Circulated at 17513.0 fi
Tested Hydraulic packer
Rigged down High pressure lines
Installed Hanger plug
Rigged down Fluid system
Schlumberger ANADRILL Survey Report
Client: BP Exploration (Alaska), Inc.
Field: Milne Point
Well Name: MPL-34
Permanent datum GROUND LEVEL
Depth measured from
Elevation of kelly bushing
Elevation of drill floor
Elevation of ground level
Magnetic Declination 28.05 DEG
Grid Convergence 0.00 DEG
Total Correction 28.05 DEG
Survey_01.ASCII FILE
21-MAY-97 01:33:3~
Page 001
50.74 FT AFE# 337076
50.74 FT JOB# 40000478
17.10 FT API# 50-029-22766
TIE IN POINT
Measured depth
True vertical depth
N/S disp (-ye for S)
E/W disp (-ye for W)
0.00 FT
0.00 FT
0.00 FT
0.00 FT
Inclination 0.00 DEG
Azimuth 0.00 DEG
Azimuth from rotary table
to the target 225.05 DEG
ORIGINAL
MEASURED INTERVAL VERTICAL
DEPTH DEPTH
FT FT FT
0.0 0.00 0.00
MinimumCurvature Method
TARGET STATION AZIMUTH LATITUDE DEPARTURE DISPLA- at AZIMUTH DLS
SECTION INCLN. N/-S E/-W CEMENT
FT DEG DEG FT FT FT DEG D/HF
0.00 0.00 0.0 0.00 0.00 0.00 0.00 0.00
70.0 70.00 70.00
170.0 100.00 170.00
270.0 100.00 270.00
370.0 100.00 370.00
471.0 101.00 471.00
0.07 0.11 230.9 -0.04 -0.05 0.07 230.90 0.16
0.19 0.10 296.7 -0.06 -0.20 0.21 252.70 0.11
0.23 0.08 305.2 0.02 -0.34 0.34 272.65 0.02
0.24 0.19 317.0 0.18 -0.51 0.54 289.15 0.11
0.22 0.23 316.7 0.45 -0.76 0.88 300.34 0.04
570.0 99.00 570.00
670.0 100.00 670.00
770.0 100.00 769.99
870.0 100.00 869.99
970.0 100.00 969.97
0.22 0.29 314.1 0.77 -1.08 1.32 305.35 0.06
0.18 0.48 320.9 1.27 -1.53 1.98 309.71 0.20
0.10 0.50 320.7 1.93 -2.07 2.83 313.05 0.02
0.26 0.55 290.2 2.43 -2.79 3.70 311.06 0.28
1.58 1.36 243.8 2.07 -4.31 4.78 295.72 1.06
1070.0 100.00 1069.92
1170.0 100.00 1169.79
1270.0 100.00 1269.54
1370.0 100.00 1368.97
1470.0 100.00 1468.05
4.81 2.42 229.7 0.19 -6.98 6.99 271.52 1.15
9.81 3.32 223.3 -3.29 -10.58 11.08 252.74 0.95
16.91 4.82 224.3 -8.40 -15.50 17.63 241.54 1.50
27.44 7.29 222.2 -16.11 -22.70 27.83 234.63 2.48
40.96 8.26 223.2 -26.05 -31.88 41.16 230.75 0.98
1570.0 100.00 1566.84
1670.0 100.00 1665.20
1770.0 100.00 1763.19
1870.0 100.00 1860.92
1920.0 50.00 1909.54
56.44 9.56 223.2 -37.34 -42.48 56.56 228.69 1.30
74.47 11.23 223.0 -50.51 -54.80 74.53 227.33 1.67
94.39 11.76 224.1 -64.97 -68.52 94.42 226.53 0.57
115.56 12.69 226.7 -79.83 -83.60 115.59 226.32 1.09
127.23 14.33 228.0 -87.74 -92.19 127.27 226.42 3.34
1970.0 50.00 1957.73
2020.0 50.00 2005.46
2070.0 50.00 2052.75
2120.0 50.00 2099.57
2170.0 50.00 2145.88
140.52 16.56 228.8 -96.57 -102.15 140.58 226.61 4.48
155.37 18.07 229.0 -106.35 -113.37 155.45 226.83 3.02
171.56 19.81 229.1 -116.99 -125.63 171.66 227.04 3.48
189.07 21.28 228.5 -128.55 -138.83 189.20 227.20 2.97
207.89 23.02 228.1 -141.09 -152.90 208.05 227.30 3.49
2220.0 50.00 2191.67
2270.0 50.00 2236.97
2320.0 50.00 2281.73
2370.0 50.00 2326.07
2420.0 50.00 2369.89
227.95 24.35 227.7 -154.56 -167.80 228.13 227.35 2.68
249.07 25.70 228.0 -168.75 -183.48 249.28 227.40 2.71
271.33 27.25 228.0 -183.66 -200.05 271.57 227.44 3.10
294.41 27.80 228.1 -199.11 -217.23 294.68 227.49 1.10
318.44 29.74 228.2 -215.16 -235.16 318.74 227.54 3.88
Page 1
Schlumberger ANADRILL Survey Report
Survey_01.ASCII_FILE
21-MAY-97 01:33:31
Page 002
Minimum Curvature Method
MEASURED INTERVAL VERTICAL TARGET
DEPTH DEPTH SECTION
2470.0 50.00 2413.09 343.58
2520.0 50.00 2455.68 369.72
2570.0 50.00 2497.64 396.82
2620.0 50.00 2539.11 424.68
2670.0 50.00 2580.05 453.30
STATION AZIMUTH LATITUDE DEPARTURE DISPLA-
INCLN. N/-S E/-W CEMENT
DEG DEG FT FT FT
30.75 228.6 -231.90 -253.98 343.92
32.44 229.1 -249.15 -273.69 370.11
33.41 229.4 -266.89 -294.28 397.28
34.51 229.2 -285.11 -315.45 425.20
35.57 229.5 -303.81 -337.23 453.90
2720.0 50.00 2620.31 482.87
2770.0 50.00 2659.79 513.47
2820.0 50.00 2698.28 545.28
2870.0 50.00 2735.78 578.24
2920.0 50.00 2772.23 612.33
37,18 229.2 -323.12 -359.73 483.54
38.52 229.2 -343.17 -382.95 514.21
40.78 229.7 -363.91 -407.19 546.11
42.05 230.0 -385.23 -432.48 579.17
44.34 230.0 -407.23 -458.69 613.38
2970.0 50.00 2807.55 647.59
3020.0 50.00 2842.04 683.67
3070.0 50.00 2875.38 720.82
3120.0 50.00 2907.63 758.93
3170.0 50.00 2938.84 797.91
45.76 229.8 -430.02 -485.76 648.75
47.00 229.6 -453.43 -513.36 684.94
49.37 229.3 -477.66 -541.67 722.20
50.30 229.0 -502.65 -570.58 760.41
52.43 228.1 -528.53 -599.82 799.46
3220.0 50.00 2968.90 837.82
3270.0 50.00 2997.97 878.46
3320.0 50.00 3025.92 919.88
3370.0 50.00 3052.58 962.16
3420.0 50.00 3078.11 1005.14
53.66 227.7 -555.35 -629.44 839.41
55.24 227.5 -582.78 -659.48 880.08
56.79 227.1 -610.89 -689.95 921.53
58.76 226.4 -639.88 -720.76 963.81
59.84 226.2 -669.58 -751.84 1006.77
3470.0 50.00 3102.52 1048.77
3520.0 50.00 3125.96 1092.93
3570.0 50.00 3148.50 1137.56
3620.0 50.00 3170.07 1182.66
3670.0 50.00 3190.71 1228.20
61.71 226.1 -699.81 -783.30 1050.38
62.39 225.7 -730.54 -815.02 1094.51
64.00 225.2 -761.85 -846.82 1139.09
64.88 225.2 -793.63 -878.83 1184.14
66.36 224.9 -825.81 -911.06 1229.63
3720.0 50.00 3210.25 1274.22
3770.0 50.00 3228.71 1320.69
3820.0 50.00 3245.95 1367.62
3870.0 50.00 3262.23 1414.89
3920.0 50.00 3277.30 1462.55
67.63 224.9 -858.41 -943.54 1275.59
69.04 224.2 -891.52 -976.14 1321.99
70.62 224.5 -925.08 -1008.95 1368.85
71.37 224.1 -958.92 -1041.96 1416.05
73.55 223.7 -993.27 -1075.02 1463.64
3970.0 50.00 3291.20 1510.57
4020.0 50.00 3303.99 1558.88
4070.0 50.00 3315.54 1607.49
4120.0 50.00 3325.67 1656.41
4170.0 50.00 3334.73 1705.53
74.18 223.5 -1028.05 -1108.14 1511.58
76.18 223.0 -1063.26 -1141.26 1559.80
77.11 223.0 -1098.83 -1174.44 1608.33
79.49 222.4 -1134.81 -1207.64 1657.16
79.63 222.4 -1171.13 -1240.79 1706.20
4220.0 50.00 3343.68 1754.67
4270.0 50.00 3352.70 1803.80
4320.0 50.00 3361.44 1852.98
4370.0 50.00 3369.73 1902.24
4420.0 50.00 3377.83 1951.53
79.76 222.5 -1207.42 -1274.00 1755.26
79.46 222.5 -1243.68 -1307.22 1804.32
80.40 222.4 -1280.01 -1340.45 1853.44
80.51 222.5 -1316.39 -1373.73 1902.63
80.85 222.6 -1352.74 -1407.09 1951.88
4470.0 50.00 3385.94 2000.82
4520.0 50.00 3394.64 2050.02
4570.0 50.00 3403.92 2099.11
4620.0 50.00 3413.98 2148.05
4670.0 50.00 3424.77 2196.83
80.48 222.6 -1389.06 -1440.49 2001.12
79.47 222.7 -1425.27 -1473.85 2050.27
79.14 222.8 -1461.35 -1507.20 2099.33
77.64 222.9 -1497.25 -1540.51 2148.24
77.45 222.8 -1533.05 -1573.71 2197.00
at AZIMUTH DLS
DEG D/HF
227.60 2.04
227.69 3.44
227.79 1.97
227.89 2.21
227.98 2.15
228.07 3.24
228.14 2.68
228.21 4.56
228.31 2.57
228.40 4.58
228.48 2.85
228.55 2.50
228.59 4.76
228.62 1.92
228.62 4.54
228.58 2.51
228.53 3.18
228.48 3.17
228.40 4.11
228.31 2.19
228.22 3.74
228.13 1.53
228.02 3.34
227.92 1.76
227.81 3.01
227.70 2.54
227.59 3.11
227.48 3.21
227.38 1.68
227.26 4.43
227.15 1.32
227.03 4.12
226.90 1.86
226.78 4.90
226.65 0.28
226.54 0.33
226.43 0.60
226.32 1.89
226.22 0.30
226.13 0.71
226.04 0.74
225.96 2.03
225.88 0.69
225.82 3.01
225.75 0.43
Page 2
Schlumberger ANADRILL Survey Report
Survey_01.ASCII_FILE
21-MAY-97 01:33:31
Page 003
Minimum Curvature Method
MEASURED INTERVAL VERTICAL TARGET STATION AZIMUTH LATITUDE DEPARTURE DISPLA- at AZIMUTH DLS
DEPTH DEPTH SECTION INCLN. N/-S E/-W CEMENT
FT FT FT FT DEG DEG FT FT FT DEG D/HF
4720.0 50.00 3435.45 2245.64 77.87 222.7 -1568.92 -1606.86 2245.78 225.68 0.86
4770.0 50.00 3446.11 2294.45 77.51 222.7 -1604.82 -1639.99 2294.56 225.62 0.72
4820.0 50.00 3456.78 2343.26 77.86 223.0 -1640.63 -1673.21 2343.36 225.56 0.91
4870.0 50.00 3467.41 2392.09 77.59 223.0 -1676.36 -1706.54 2392.16 225.51 0.54
4920.0 50.00 3477.97 2440.93 78.02 223.5 -1711.96 -1740.02 2441.00 225.47 1.30
4970.0 50.00 3487.85 2489.93 79.18 224.0 -1747.36 -1773.91 2489.99 225.43 2.52
5020.0 50.00 3497.12 2539.06 79.45 224.2 -1782.65 -1808.11 2539.11 225.41 0.67
5070.0 50.00 3505.95 2588.27 80.20 224.1 -1817.96 -1842.39 2588.31 225.38 1.51
5120.0 50.00 3514.41 2637.54 80.32 224.2 -1853.32 -1876.71 2637.58 225.36 0.31
5170.0 50.00 3522.84 2686.82 80.27 224.4 -1888.59 -1911.13 2686.86 225.34 0.41
5220.0 50.00 3531.24 2736.11 80.40 224.3 -1923.84 -1945.59 2736.14 225.32 0.33
5270.0 50.00 3539.58 2785.40 80.39 224.3 -1959.12 -1980.02 2785.43 225.30 0.02
5320.0 50.00 3547.86 2834.71 80.54 224.3 -1994.41 -2014.46 2834.73 225.29 0.30
5370.0 50.00 3556.63 2883.93 79.25 224.2 -2029.67 -2048.80 2883.95 225.27 2.59
5420.0 50.00 3566.05 2933.03 79.04 224.2 -2064.87 -2083.04 2933.04 225.25 0.42
5470.0 50.00 3575.59 2982.10 78.96 224.4 -2100.00 -2117.32 2982.12 225.24 0.42
5520.0 50.00 3585.69 3031.07 77.74 224.5 -2134.96 -2151.61 3031.08 225.22 2.45
5570.0 50.00 3596.57 3079.87 77.12 224.7 -2169.70 -2185.88 3079.88 225.21 1.30
5620.0 50.00 3607.70 3128.61 77.15 225.1 -2204.23 -2220.28 3128.63 225.21 0.78
5670.0 50.00 3619.10 3177.30 76.50 225.2 -2238.57 -2254.80 3177.31 225.21 1.31
5720.0 50.00 3630.76 3225.92 76.52 225.4 -2272.77 -2289.36 3225.93 225.21 0.39
5770.0 50.00 3642.52 3274.51 76.27 225.6 -2306.83 -2324.02 3274.53 225.21 0.63
5820.0 50.00 3654.06 3323.16 77.05 225.8 -2340.81 -2358.84 3323.17 225.22 1.61
5870.0 50.00 3665.08 3371.93 77.49 226.0 -2374.75 -2393.86 3371.94 225.23 0.96
5920.0 50.00 3675.98 3420.71 77.31 226.1 -2408.61 -2428.99 3420.73 225.24 0.41
5970.0 50.00 3686.66 3469.55 78.04 226.4 -2442.39 -2464.28 3469.57 225.26 1.57
6020.0 50.00 3697.27 3518.39 77.45 226.8 -2475.96 -2499.78 3518.42 225.27 1.42
6070.0 50.00 3707.66 3567.27 78.57 227.3 -2509.29 -2535.58 3567.30 225.30 2.44
6120.0 50.00 3717.57 3616.24 78.57 227.6 -2542.43 -2571.68 3616.28 225.33 0.59
6170.0 50.00 3727.11 3665.26 79.42 227.9 -2575.43 -2608.01 3665.32 225.36 1.80
6220.0 50.00 3735.93 3714.41 80.26 228.3 -2608.29 -2644.64 3714.48 225.40 1.86
6270.0 50.00 3744.32 3763.61 80.42 228.6 -2640.99 -2681.53 3763.70 225.44 0.67
6320.0 50.00 3752.52 3812.83 80.71 228.8 -2673.54 -2718.59 3812.94 225.48 0.70
6370.0 50.00 3760.67 3862.05 80.52 229.1 -2705.94 -2755.79 3862.18 225.52 0.70
6420.0 50.00 3768.99 3911.22 80.33 229.6 -2738.05 -2793.19 3911.38 225.57 1.06
6470.0 50.00 3777.15 3960.37 80.88 230.1 -2769.86 -2830.90 3960.57 225.62 1.48
6520.0 50.00 3785.53 4009.46 79.82 230.4 -2801.38 -2868.80 4009.70 225.68 2.20
6570.0 50.00 3794.32 4058.46 79.92 230.5 -2832.72 -2906.75 4058.76 225.74 0.28
6620.0 50.00 3803.16 4107.45 79.72 230.6 -2863.99 -2944.75 4107.80 225.80 0.45
6670.0 50.00 3812.50 4156.33 78.75 230.7 -2895.14 -2982.73 4156.74 225.85 1.95
6720.0 50.00 3822.26 4205.13 78.74 230.7 -2926.20 -3020.68 4205.61 225.91 0.02
6770.0 50.00 3832.13 4253.92 78.48 230.4 -2957.34 -3058.53 4254.46 225.96 0.79
6820.0 50.00 3841.60 4302.81 79.70 230.3 -2988.67 -3096.33 4303.42 226.01 2.45
6870.0 50.00 3850.37 4351.83 80.09 230.2 -3020.14 -3134.18 4352.51 226.06 0.80
6920.0 50.00 3859.17 4400.85 79.63 230.1 -3051.68 -3171.96 4401.60 226.11 0.94
Page 3
Schlumberger ANADRILL Survey Report
Survey_01.ASCII_FILE
21-MAY-97 01:33:31
Page 004
Minimum Curvature Method
MEASURED INTERVAL VERTICAL TARGET STATION AZIMUTH LATITUDE DEPARTURE DISPLA- at AZIMUTH DLS
DEPTH DEPTH SECTION INCLN. N/-S E/-W CEMENT
FT FT FT FT DEG DEG FT FT FT DEG D/HF
6970.0 50.00 3868.07 4449.87 79.87 230.0 -3083.28 -3209.68 4450.69 226.15 0.52
7020.0 50.00 3876.95 4498.89 79.67 230.0 -3114.91 -3247.38 4499.79 226.19 0.40
7070.0 50.00 3885.86 4547.90 79.79 230.2 -3146.46 -3285.12 4548.87 226.24 0.46
7120.0 50.00 3894.86 4596.88 79.48 230.4 -3177.88 -3322.96 4597.93 226.28 0.73
7170.0 50.00 3904.50 4645.72 78.28 230.5 -3209.12 -3360.79 4646.87 226.32 2.41
7220.0 50.00 3914.57 4694.47 78.48 230.5 -3240.27 -3398.58 4695.71 226.37 0.40
7270.0 50.00 3924.89 4743.18 77.71 230.5 -3271.39 -3436.33 4744.51 226.41 1.54
7320.0 50.00 3935.31 4791.85 78.22 230.6 -3302.46 -3474.09 4793.28 226.45 1.04
7370.0 50.00 3945.98 4840.50 77.15 229.9 -3333.70 -3511,65 4842.03 226.49 2.54
7420.0 50.00 3957.37 4889.05 76.50 228.9 -3365.41 -3548.59 4890.65 226.52 2.51
7470.0 50.00 3968.98 4937.59 76.65 228.1 -3397.67 -3584.98 4939.26 226.54 1.39
7520.0 50.00 3980.68 4986.15 76.30 227.4 -3430.35 -3620.97 4987.86 226.55 1.53
7570.0 50.00 3992.33 5034.74 76.74 227.0 -3463.39 -3656.64 5036.48 226.55 1.17
7620.0 50.00 4003.79 5083.39 76.77 226.2 -3496.83 -3692.00 5085.15 226.56 1.56
7670.0 50.00 4015.20 5132.07 76.85 225.9 -3530.62 -3727.05 5133.83 226.55 0.61
7720.0 50.00 4026.33 5180.81 77.42 225.6 -3564.63 -3761.97 5182.57 226.54 1.28
7770.0 50.00 4037.41 5229.56 76.98 225.7 -3598.71 -3796.83 5231.32 226.53 0.90
7820.0 50.00 4048.00 5278.42 78.55 225.8 -3632.81 -3831.83 5280.18 226.53 3.15
7870.0 50.00 4058.51 5327.30 77.18 225.7 -3666.92 -3866.85 5329.05 226.52 2.75
7920.0 50.00 4069.71 5376.03 76.94 225.5 -3701.01 -3901.66 5377.78 226.51 0.62
7970.0 50.00 4080.84 5424.77 77.33 225.0 -3735.33 -3936.28 5426.51 226.50 1.25
8020.0 50.00 4091.71 5473.58 77.57 224.6 -3769.96 -3970.67 5475.29 226.49 0.92
8070.0 50,00 4101.97 5522.51 78.74 224.6 -3804.80 -4005.03 5524.20 226.47 2.34
8120.0 50.00 4111.79 5571.53 78.60 224.6 -3839.71 -4039.45 5573.20 226.45 0.28
8170.0 50.00 4121.61 5620.56 78.75 224.6 -3874.62 -4073.88 5622.20 226.44 0.30
8220.0 50.'00 4131.50 5669.57 78.44 224.5 -3909.55 -4108.26 5671.19 226.42 0.65
8270.0 50.00 4141.65 5718.52 78.13 224.6 -3944.44 -4142.61 5720.12 226.40 0.65
8320.0 50.00 4151.83 5767.47 78.37 224.5 -3979.32 -4176.95 5769.05 226.39 0.52
8370.0 50.00 4162.22 5816.38 77.66 224.3 -4014.27 -4211.17 5817.93 226.37 1.47
8420.0 50.00 4172.72 5865.26 78.09 224.1 -4049.31 -4245.25 5866.78 226.35 0.94
8470.0 50.00 4182.91 5914.20 78.39 223.7 -4084.58 -4279.19 5915.68 226.33 0.99
8520.0 50.00 4193.07 5963.14 78.15 223.6 -4120.01 -4312.98 5964.59 226.31 0.52
8570.0 50.00 4203.32 6012.06 78.19 223.5 -4155.48 -4346.70 6013.47 226.29 0.21
8620.0 50.00 4213.87 6060.92 77.46 223.5 -4190.93 -4380.34 6062.29 226.27 1.46
8670,0 50.00 4224.55 6109.75 77.88 223.3 -4226.42 -4413.91 6111.07 226.24 0.93
8720.0 50.00 4234.94 6158.63 78.13 223.4 -4261.98 -4447.48 6159.92 226.22 0.54
8770.0 50.00 4245.11 6207.57 78.39 223.3 -4297.58 -4481.08 6208.81 226.20 0.56
8820.0 50.00 4255.32 6256.49 78.05 223.1 -4333.26 -4514.59 6257.69 226.17 0.78
8870.0 50.00 4265.69 6305.37 78.01 222.9 -4369.04 -4547.95 6306.53 226.15 0.40
8920.0 50.00 4275.54 6354.35 79.26 222.7 -4405.00 -4581.25 6355.47 226.12 2.53
8970.0 50.00 4284.74 6403.45 79.53 222.6 -4441.15 -4614.55 6404.52 226.10 0.57
9020.0 50.00 4293.82 6452.58 79.56 222.6 -4477.34 -4647.83 6453.60 226.07 0.06
9070.0 50.00 4303.10 6501.66 79.05 222.4 -4513.57 -4681.03 6502.64 226.04 1.09
9120.0 50.00 4312.81 6550.65 78.54 222,2 -4549.84 -4714.04 6551.58 226.02 1.09
9170.0 50.00 4322.71 6599.60 78.63 222.3 -4586.15 -4746.96 6600.48 225.99 0.18
Page 4
Survey_01.ASCII_FILE
Schlumberger ANADRILL Survey Report 21-MAY-97 01:33:31
Page 005
Minimum Curvature Method
MEASURED INTERVAL VERTICAL TARGET STATION
DEPTH DEPTH SECTION INCLN.
FT FT FT FT DEG
9220.0 50.00 4332.45 6648.59 78.90
9270.0 50.00 4341.94 6697.63 79.22
9320.0 50.00 4351.55 6746.63 78.62
9370.0 50.00 4361.25 6795.61 78.99
9420.0 50.00 4370.37 6844.71 80.00
AZIMUTH LATITUDE DEPARTURE DISPLA- at AZIMUTH DLS
N/-S E/-W CEMENT
DEG FT FT FT DEG D/HF
222.5 -4622.39 -4780.00 6649.43 225.96 0.80
222.3 -4658.65 -4813.10 6698.42 225.93 0.75
222.1 -4695.02 -4846.03 6747.39 225.91 1.34
222.0 -4731.48 -4878.85 6796.32 225.88 0.74
222.5 -4767.86 -4911.90 6845.39 225.85 2.25
9470.0 50.00 4379.19 6893.88 79.68
9520.0 50.00 4387.97 6943.05 80.09
9570.0 50.00 4396.62 6992.25 79.98
9620.0 50.00 4405.26 7041.47 80.13
9670.0 50.00 4413.81 7090.72 80.18
222.5 -4804.15 -4945.15 6894.52
222.2 -4840.53 -4978.31 6943.65
222.8 -4876.84 -5011.58 6992.81
223.6 -4912.74 -5045.29 7042.01
224.2 -4948.23 -5079.45 7091.25
225.83 0.64
225.80 1.01
225.78 1.20
225.76 1.60
225.75 1.19
9720.0 50.00 4422.52 7139.95 79.76
9770.0 50.00 4431.40 7189.16 79.78
9820.0 50.00 4440.28 7238.36 79.76
9870.0 50.00 4449.01 7287.58 80.13
9920.0 50.00 4457.74 7336.79 79.75
224.7 -4983.38 -5113.93 7140.47
224.7 -5018.36 -5148.54 7189.67
224.1 -5053.51 -5182.97 7238.86
223.6 -5089.02 -5217.07 7288.07
223.2 -5124.79 -5250.90 7337.26
225.74 1.29
225.73 0.04
225.72 1.18
225.71 1.23
225.70 1.09
9970.0 50.00 4466.46 7386.00 80.15
10020.0 50.00 4475.03 7435.22 80.13
10070.0 50.00 4483.74 7484.41 79.80
10120.0 50.00 4492.39 7533.60 80.28
10170.0 50.00 4500.94 7582.79 80.01
222.9 -5160.76 -5284.51 7386.44
222.7 -5196.91 -5317.98 7435.64
222.4 -5233.18 -5351.27 7484.80
222.2 -5269.60 -5384.42 7533.97
221.9 -5306.18 -5417.41 7583.13
225.68 0.99
225.66 0.40
225.64 0.89
225.62 1.04
225.59 0.80
10220.0 50.00 4509.36 7632.00 80.61
10270.0 50.00 4517.60 7681.22 80.43
10320.0 50.00 4525.86 7730.43 80.55
10370.0 50.00 4533.97 7779.65 80.78
10420.0 50.00 4542.22 7828.89 80.22
221.6 -5342.95 -5450.23 7632.31
221.4 -5379.89 -5482.91 7681.50
221.2 -5416.94 -5515.45 7730.68
221.2 -5454.06 -5547.95 7779.88
222.8 -5490.70 -5580.95 7829.10
225.57 1.34
225.54 0.53
225.52 0.46
225.49 0.46
225.47 3.35
10470.0 50.00 4550.42 7878.18 80.90
10520.0 50.00 4558.41 7927.49 80.72
10570.0 50.00 4566.68 7976.75 80.24
10620.0 50.00 4575.56 8025.92 79.29
10670.0 50.00 4584.93 8075.01 79.11
222.8 -5526.89 -5614.46 7878.37
222.4 -5563.23 -5647.87 7927.67
222.4 -5599.64 -5681.12 7976.91
223.2 -5635.74 -5714.55 8026.06
223.6 -5671.43 -5748.30 8075.15
225.45 1.36
225.43 0.87
225.41 0.96
225.40 2.47
225.39 0.86
10720.0 50.00 4594.60 8124.06 78.59
10770.0 50.00 4604.40 8173.09 78.80
10878.1 108.10 4625.41 8279.12 78.79
10972.6 94.50 4643.92 8371.76 78.62
11066.0 93.40 4662.63 8463.23 78.27
224.8 -5706.60 -5782.50 8124.19
225.5 -5741.17 -5817.26 8173.22
225.7 -5815.37 -5893.02 8279.26
227.3 -5879.15 -5960.23 8371.91
225.7 -5942.14 -6026.61 8463.40
225.38 2.57
225.38 1.44
225.38 0.18
225.39 1.67
225.40 1.72
11155.8 89.80 4681.47 8551.02 77.51
11249.4 93.60 4701.80 8642.37 77.40
11345.5 96.10 4722.06 8736.28 78.26
11436.9 91.40 4740.88 8825.63 77.98
11530.7 93.80 4760.65 8917.13 77.68
226.6 -6002.97 -6089.93 8551.19 225.41 1.29
223.8 -6067.34 -6154.75 8642.54 225.41 2.92
223.5 -6135.31 -6219.59 8736.44 225.39 0.95
221.5 -6201.25 -6280.02 8825.76 225.36 2.16
221.2 -6270.08 -6340.59 8917.23 225.32 0.45
11625.8 95.10 4780.14 9010.04 78.67
11718.3 92.50 4798.22 9100.71 78.79
11812.5 94.20 4815.43 9193.30 80.16
11904.6 92.10 4831.36 9283.95 79.92
11998.0 93.40 4847.74 9375.86 79.87
222.0 -6339.69 -6402.39 9010.12
224.4 -6405.81 -6464.49 9100.77
223.2 -6472.65 -6528.59 9193.35
222.8 -6539.00 -6590.45 9283.99
224.0 -6605.81 -6653.63 9375.90
225.28 1.33
225.26 2.55
225.25 1.92
225.22 0.50
225.21 1.27
Page 5
Survey_01.ASCII_FILE
Schlumberger ANADRILL Survey Report 21-MAY-97 01:33:31 Page 006
Minimum Curvature Method
MEASURED INTERVAL VERTICAL TARGET STATION AZIMUTH LATITUDE DEPARTURE DISPLA- at AZIMUTH DLS
DEPTH DEPTH SECTION INCLN. N/-S E/-W CEMENT
FT FT FT FT DEG DEG FT FT FT DEG D/HF
12092.0 94.00 4863.81 9468.47 80.45 226.8 -6670.83 -6719.57 9468.50 225.21 3.00
12185.2 93.20 4879.16 9560.38 80.60 224.8 -6734.97 -6785.41 9560.42 225.21 2.23
12277.8 92.60 4894.54 9651.68 80.28 223.2 -6800.71 -6848.79 9651.71 225.20 1.63
12373.7 95.90 4910.50 9746.16 80.56 222.3 -6870.15 -6912.97 9746.19 225.18 0.97
12468.6 94.90 4925.96 9839.75 80.68 224.9 -6937.95 -6977.54 9839.77 225.16 2.71
12562.0 93.40 4941.19 9931.90 80.56 224.7 -7003.33 -7042.47 9931.92 225.16 0.25
12655.5 93.50 4956.59 10024.12 80.48 223.8 -7069.39 -7106.82 10024.13 225.15 0.95
12749.6 94.10 4971.79 10116.92 80.92 222.4 -7137.20 -7170.27 10116.93 225.13 1.54
12842.2 92.60 4986.19 10208.36 81.20 224.8 -7203.44 -7233.35 10208.37 225.12 2.58
12933.7 91.50 5000.41 10298.75 80.92 224.3 -7267.85 -7296.76 10298.75 225.11 0.62
13030.0 96.30 5016.17 10393.72 80.24 223.1 -7336.53 -7362.39 10393.72 225.10 1.42
13123.4 93.40 5032.46 10485.62 79.67 222.7 -7403.90 -7425.00 10485.63 225.08 0.74
13218.8 95.40 5050.24 10579.28 78.85 223.0 -7472.62 -7488.74 10579.28 225.06 0.91
13311.9 93.10 5068.34 10670.49 78.73 221.3 -7540.32 -7550.02 10670.49 225.04 1.80
13404.3 92.40 5086.14 10761.01 79.05 222.5 -7607.80 -7610.57 10761.02 225.01 1.32
13500.2 95.90 5104.05 10855.20 79.43 225.0 -7675.85 -7675.72 10855.20 225.00 2.59
13592.9 92.70 5121.26 10946.29 79.17 225.0 -7740.26 -7740.13 10946.29 225.00 0.28
13686.5 93.60 5138.89 11038.19 79.12 222.9 -7806.44 -7803.92 11038.19 224.99 2.20
13781.7 95.20 5156.73 11131.69 79.29 226.2 -7873.07 -7869.52 11131.69 224.99 3.41
13875.4 93.70 5173.76 11223.78 79.76 227.2 -7936.26 -7936.57 11223.79 225.00 1.16
13969.0 93.60 5190.71 11315.81 79.37 225.5 -7999.80 -8003.18 11315.81 225.01 1.83
14064.1 95.10 5208.30 11409.25 79.32 226.9 -8064.48 -8070.63 11409.25 225.02 1.45
14184.5 120.40 5230.10 11527,62 79.82 226.1 -8145.99 -8156.52 11527.62 225.04 0.77
14278.1 93.60 5246.81 11619.71 79.61 224.2 -8210.94 -8221.81 11619.71 225.04 2.01
14373.1 95.00 5264.33 11713.08 79.14 225.8 -8276.96 -8287.83 11713.08 225.04 1.73
14468.0 94.90 5282.48 11806.22 78.80 223.8 -8343.05 -8353.46 11806.22 225.04 2.10
14561.0 93.00 5300.76 11897.40 78.54 224.9 -8408.25 -8417.21 11897.40 225.03 1.19
14653.7 92,70 5319.34 11988.20 78.33 223.2 -8473.53 -8480.35 11988.20 225.02 1.81
14747.7 94.00 5338.57 12080.19 78.07 224.4 -8539.94 -8544.03 12080.19 225.01 1.28
14840.5 92.80 5357.99 12170.91 77.77 223.3 -8605.38 -8606.90 12170.92 225.01 1.20
14936.6 96.10 5378.37 12264.80 77.74 224.0 -8673.33 -8671.72 12264.80 224.99 0.71
15029.5 92.90 5398.27 12355.50 77.52 222.9 -8739.21 -8734.13 12355.51 224.98 1.18
15122.6 93.10 5418.66 12446.29 77.18 223.4 -8805.48 -8796.25 12446.30 224.97 0.64
15215.6 93.00 5439.63 12536.86 76.76 223.6 -8871.20 -8858.62 12536.88 224.96 0.50
15309.6 94.00 5461.35 12628.23 76.52 221.5 -8938.57 -8920.46 12628.25 224.94 2.19
15404.1 94.50 5483.43 12719.83 76.46 219.6 -9008.39 -8980.20 12719.86 224.91 1.96
15497,1 93.00 5505.04 12810.09 76.67 223.4 -9076.12 -9040.12 12810.14 224.89 3.98
15593.1 96.00 5527.37 12903.44 76.43 224.6 -9143.28 -9104.98 12903.49 224.88 1.24
15686.2 93.10 5549.52 12993.84 76.05 223.2 -9208.44 -9167.68 12993.91 224.87 1.52
15780.0 93.80 5572.35 13084.66 75.78 220.3 -9276.30 -9228.25 13084.74 224.85 3.01
15872.4 92.40 5595.45 13174.00 75.28 223.8 -9342.73 -9288.17 13174.09 224.83 3.71
15965.5 93.10 5619.52 13263.89 74.75 222.9 -9408.13 -9349.90 13263.99 224.82 1.09
16061.3 95.80 5645.05 13356.09 74.34 221.1 -9476.74 -9411.68 13356.21 224.80 1.86
16155.7 94.40 5671.87 13446.44 72.65 222.3 -9544.32 -9471.89 13446.58 224.78 2.17
16249.5 93.80 5701.39 13535.34 70.66 221.8 -9610.42 -9531.52 13535.51 224.76 2.18
Page 6
Survey_01.ASCII_FILE
Schlumberger ANADRILL Survey Report 21-MAY-97 01:33:31
Page 007
Minimum Curvature Method
MEASURED INTERVAL VERTICAL TARGET
DEPTH DEPTH SECTION
FT FT FT FT
16343.4 93.90 5734.57 13623.10
16441.2 97.80 5772.96 13713.04
16528.4 87.20 5810.16 13791.87
16623.0 94.60 5854.32 13875.51
16717.7 94.70 5902.29 13957.14
STATION
INCLN.
DEG
67.95
65.83
63.66
60.69
58.43
AZIMUTH LATITUDE DEPARTURE DISPLA- at AZIMUTH DLS
N/-S E/-W CEMENT
DEG FT FT FT DEG D/HF
223.8 -9674.88 -9591.18 13623.29 224.75 3.51
226.3 -9738.42 -9654.82 13713.22 224.75 3.20
226.9 -9792.61 -9712.12 13792.04 224.76 2.57
224.9 -9850.81 -9772.20 13875.67 224.77 3.65
223.9 -9909.13 -9829.33 13957.31 224.77 2.55
16810.9 93.20 5953.05 14035.29
16903.1 92.20 6006.97 14110.05
16994.6 91.50 6063.88 14181.60
17088.6 94,00 6125.82 14252.03
17182.9 94.30 6191.64 14319.16
55.57
52.85
50.23
47.33
44.13
224.5 -9965.17 -9883.81 14035.46 224.77 3.12
227.3 -10017.22 -9937.48 14110.22 224.77 3.84
228.6 -10065.22 -9990.67 14181.75 224.79 3.07
231.4 -10110.68 -10044.79 14252.15 224.81 3.81
230.9 -10153.03 -10097.38 14319.25 224.84 3.41
17277.6 94.70 6261.35 14382.93
17371.3 93.70 6333.93 14441.91
17464.3 93.00 6409.05 14496.47
17558.1 93.80 6486.25 14549.51
17651.4 93.30 6563.53 14601.50
41.04
37.41
34.83
34.39
33.77
230.3 -10193.69 -10146.89 14383.00 224.87 3.29
230.6 -10231.42 -10192.57 14441.97 224.89 3.88
230.7 -10266.17 -10234.96 14496.51 224.91 2.77
230.0 -10300.17 -10275.98 14549.54 224.93 0.63
232.1 -10333.04 -10316.63 14601.52 224.95 1.43
17746.2 94.80 6642.62 14653.36
17840.8 94.60 6721.96 14704.58
17936.6 95.80 6802.71 14755.93
18030.8 94.20 6882.65 14805.53
18125.1 94.30 6963.20 14854.26
33.13
32.89
32.21
31.67
30.99
232.1 -10365.13 -10357.86 14653.37 224.98 0.68
230.7 -10397.28 -10398.14 14704.58 225.00 0.85
229.1 -10430.48 -10437.57 14755.93 225.02 1.15
231.9 -10462.17 -10476.00 14805.53 225.04 1.67
230.9 -10492.76 -10514.33 14854.26 225.06 0.91
18211.3 86.20 7037.43 14897.89
THE LAST SURVEY IS PROJECTED
18310.0 98.70 7122.79 14947.24
30.13
30.13
230.1 -10520.63 -10548.15 14897.89 225.07 1.10
230.1 -10552.41 -10586.15 14947.24 225.09 0.00
Page 7
ORIGINAL
B.P. EXPLORATION
L PAD, WELL NO. MPL-341
MILNE POINT FIELD, ALASKA
Gyro Multishot Survey Inside 7" CASING
Survey date: 03-JULY, 1997
Job number :A0797GCE411
CONTENTS
JOB NUMBER :A0797GCE411
1. DISCUSSION, SURVEY CERTIFICATION SHEET
2. SURVEY DETAILS
3. OUTRUN SURVEY LISTING
4. QUALITY CONTROL
5. EQUIPMENT AND CHRONOLOGICAL REPORT
1. DISCUSSION , SURVEY CERTIFICATION SHEET
DISCUSSION
JOB NUMBER · A0797GCE411
Tool 778 was run in WELL# MPL-341 on ATLAS 5/16" wireline inside CASING.
The survey was run without problems.
SURVEY CERTIFICATION SHEET
JOB NUMBER: A0797GCE411
The data for this survey and the calculations for this survey were obtained and performed by me
according to standards and procedures as set forth by Gyrodata Limited, true and correct to the best of
my knowledge.
TOM STODDARD
OPERATIONS ENGINEER
The data and calculations for this survey have been checked by me and conform to the standards and
procedures as set forth by Gyrodata Limited.
This report represents a directional survey of this well based on the original data obtained at the wellsite.
Checked by :-
ROB SHOUP
OPERATIONS MANAGER
2. SURVEY DETAILS
SURVEY DETAILS
JOB NUMBER: A0797GCE411
CLIENT: B.P. EXPLORATION
RIG: ATLAS
LOCATION:
L PAD, ALASKA
WELL: MPL-341
LATITUDE: 70.497 N
LONGITUDE: 149.5 W
SURVEY DATE:
SURVEY TYPE :
03, J U LY, 1997
GYRO MULTISHOT IN 7" CASING
DEPTH REFERENCE:
50.88'
MAX. SURVEY DEPTH:
ROTARY TABLE ELEVATION
18100'
SURVEY TIED ONTO: NA
SURVEYINTERVAL:
0-18100'
APl NUMBER: 050-029-22766
TARGET DIRECTION: 225.05
GRID CORRECTION: N/A
CALCULATION METHOD: MINIMUM CURVATURE
SURVEYOR: TOM STODDARD
3. OUTRUN SURVEY LISTING
A Gyrodat a Di rec t i onal Survey
for
B.P. EXPLORATION
L PAD, WELL NO. MPL-34I
MILNE POINT FIELD, ALASKA
Job Number: A0797GCE411
Run Date: 3-Jul-97 15:00:00
Surveyor: TOM STODDARD
Calculation Method: MINIMUM CURVATURE
Survey Latitude: 70.497000 deg. N
Sub-sea Correction from Vertical Reference: 50.8 ft.
Azimuth Correction:
Gyro: Bearings are Relative to True North
Proposed Well Direction: 225.050 deg
Vertical Section Calculated from Well Head Location
Closure Calculated from Well Head Location
Horizontal Coordinates Calculated from Local Horizontal Reference
A Gyrodata
B.P. EXPLORATION
L PAD, WELL NO. MPL-34I
MILNE POINT FIELD, ALASKA
Job Number: A0797GCE411
MEASURED I N C L AZIMUTH VERTICAL
DEPTH DEPTH
feet deg. deg. feet
VERTICAL
SECTION
feet
0.0 0.00 0.00 0.0
100.0 .17 16.63 100.0
200.0 .18 5.43 200.0
300.0 .21 16.03 300.0
400.0 .12 177.24 400.0
500.0 .37 337.32 500.0
600.0 .31 289.14 600.0
700.0 .29 347.78 700.0
800.0 .31 329.27 800.0
900.0 .52 300.63 900.0
1001.0 1.39 240.37 1001.0
1100.0 2.44 231.35 1099.9
1200.0 3.43 227.28 1199.8
1301.0 4.89 222.04 1300.5
1400.0 7.30 221.72 1399.0
1500.0 8.16 221.55 1498.0
1600.0 9.67 221.92 1596.8
1700.0 11.63 222.23 1695.1
1801.0 11.93 221.77 1794.0
1901.0 12.93 224.21 1891.6
2002.0 16.64 226.22 1989.3
2050.0 18.02 229.58 2035.1
2100.0 19.71 229.61 2082.4
2150.0 21.35 229.08 2129.2
2200.0 22.94 228.27 2175.5
0.0
-.8
-1.0
-1.0
.3
3.5
8.6
16.0
26.5
39.9
55.4
73.8
94.4
115.9
141.7
156.0
172.1
189.6
208.4
Directional
DOGLEG CLOSURE
SEVERITY DIST. AZIMUTH
deg./ feet deg.
100 ft.
.00 0.0 0.0
.17 .1 16.6
.04 .5 12.7
.05 .8 12.0
.32 .9 14.5
.48 1.1 5.5
.28 1.5 349.0
.30 1.9 341.7
.10 2.4 340.9
.29 3.0 334.3
1.20 3.7 310.4
1 . 10 5 . 5 274 . 8
1 . 01 9.8 252 . 7
1.49 16.6 240.6
2.43 26.7 233.3
.86 40.0 229.4
1.52 55.4 227.3
1.96 73.8 226.0
.31 94.4 225.1
1.13 115.9 224.7
3.72 141.7 224.8
3.55 156.0 225.1
3.37 172.1 225.5
3.32 189.6 225.9
3.22 208.4 226.1
Survey
Page
HORIZONTAL
COORDINATES
feet
0.00 N 0.00 E
.14 N .04 E
.44 N .10 E
.78 N .17 E
.86 N .22 E
1.05 N .10 E
1.44 N .28 W
1.78 N .59 W
2.27 N .79 W
2.74 N 1.32 W
2.37 N 2.78 W
.46 N 5.47 W
2.90 S 9.33 W
8.15 S 14.43 W
15.98 S 21.45 W
26.03 S 30.38 W
37.59 S 40.70 W
51.31 S 53.09 W
66.64 S 66.89 W
82.37 S 81.57 W
100.48 S 99.90 W
110.05 S 110.52 W
120.53 S 122.83 W
131.95 S 136.13 W
144.40 S 150.28 W
A Gyroda t a Di rec t i ona i
B.P. EXPLORATION
L PAD, WELL NO. MPL-34I
MILNE POINT FIELD, ALASKA
Job Number: A0797GCE411
MEASURED
DEPTH
feet
I N C L AZIMUTH VERTICAL
DEPTH
deg. deg. feet
VERTICAL DOGLEG CLOSURE
SECTION SEVERITY DIST. AZIMUTH
feet deg./ feet deg.
100 ft.
2250.0
2300.0
2350.0
2400.0
2450.0
24.42 228.16 2221.3
25.82 228.50 2266.6
27.00 228.49 2311.4
27.92 228.61 2355.7
29.66 228.69 2399.6
228.4 2.98 228.5 226.3
249.6 2.80 249.7 226.5
271.8 2.37 271.9 226.6
294.8 1.84 295.0 226.8
318.9 3.48 319.0 226.9
2500.0
2550.0
2600.0
2650.0
2700.0
30.88 228.85 2442.7
32.37 229.40 2485.3
33.30 229.65 2527.3
34.77 229.52 2568.8
35.42 229.85 2609.7
344 . 0 2 . 45 344 . 2 227 . 1
370.2 3.02 370.4 227.2
397.2 1.89 397.5 227.4
425 . 1 2 . 95 425 . 5 227 . 5
453 . 8 1 . 34 454 . 2 227 . 7
2750.0
2800.0
2850.0
2900.0
2950.0
37.16 229.54 2650.0
38.48 229.52 2689.5
40.56 230.17 2728.0
42.17 230.38 2765.6
44.31 230.35 2802.0
483.2 3.50 483.8 227.8
513.8 2.65 514.4 227.9
545.5 4.23 546.2 228.0
578.4 3.24 579.3 228.1
612.5 4.29 613.5 228.3
3000.0
3050.0
3100.0
3150.0
3200.0
45.65 230.36 2837.3
47.15 230.18 2871.8
49.12 229.70 2905.2
50.48 229.45 2937.5
52.41 228.58 2968.6
647.7 2.67 648.8 228.4
683.8 3.02 685.0 228.5
720.9 3.99 722.2 228.5
758.9 2.76 760.4 228.6
797.9 4.08 799.5 228.6
3250.0
3300.0
3350.0
3400.0
3450.0
53.49 228.23 2998.8
55.29 228.04 3027.9
56.60 227.66 3055.9
58.73 226.95 3082.6
59.75 226.67 3108.2
837.8 2.23 839.4 228.6
878.4 3.63 880.0 228.6
919.7 2.70 921.5 228.6
962.0 4.42 963.7 228.5
1004.9 2.09 1006.6 228.4
Survey
HORIZONTAL
COORDINATES
feet
157.78 S 165.25 W
171.92 S 181.08 W
186.69 S 197.71 W
201.95 S 215.00 W
217.86 S 233.08 W
234.48 S 252.03 W
251.63 S 271.86 W
269.23 S 292.48 W
287.37 S 313.79 W
305.97 S 335.71 W
325.11 S 358.27 W
345.01 S 381.59 W
365.53 S 405.91 W
386.64 S 431.33 W
408.49 S 457.71 W
431.04 S 484.92 W
454.18 S 512.77 W
478.14 S 541.26 W
502.91 S 570.33 W
528.56 S 599.84 W
555.05 S 629.68 W
582.17 S 659.96 W
609.97 S 690.67 W
638.62 S 721.72 W
668.03 S 753.04 W
Page
A Gyrodata
B.P. EXPLORATION
L PAD, WELL NO. MPL-34I
MILNE POINT FIELD, ALASKA
Job Number: A0797GCE411
MEASURED
DEPTH
feet
I N C L AZIMUTH VERTICAL
DEPTH
deg. deg. feet
VERTICAL
SECTION
feet
3500
3550
3600
3650
3700
.0 61.54 226.65 3132.7
.0 62.65 226.25 3156.1
.0 63.98 225.78 3178.5
.0 64.98 225.67 3200.1
.0 66.38 225.40 3220.7
3750.0 67.34 225.47 3240.3
3800.0 69.42 224.81 3258.8
3850.0 70.02 224.82 3276.1
3900.0 71.15 224.69 3292.7
3950.0 73.16 224.40 3308.0
4000.0 74.28 224.05 3322.0
4050.0 75.86 223.78 3334.9
4100.0 76.57 223.59 3346.8
4150.0 79.10 223.04 3357.4
4200.0 79.47 223.05 3366.7
4250.0 79.86 223.14 3375.6
4300.0 79.71 223.20 3384.5
4350.0 80.00 223.12 3393.3
4400.0 80.58 223.07 3401.7
4450.0 80.88 223.22 3409.8
4500.0 80.72 223.18 3417.8
4550.0 79.84 223.26 3426.2
4600.0 79.26 223.28 3435.3
4650.0 78.02 223.42 3445.2
4700.0 77.65 223.37 3455.7
1048.5
1092.6
1137.3
1182.4
1228.0
1274.0
1320.4
1367.3
1414.5
1462.1
1510.1
1558.4
1606.9
1655.8
1704.9
1754.0
1803.2
1852.4
1901.6
1951.0
2000.3
2049.6
2098.7
2147.7
2196.6
Directional
DOGLEG CLOSURE
SEVERITY DIST. AZIMUTH
deg./ feet deg.
100 ft.
3.58 1050.2 228.4
2.34 1094.4 228.3
2.79 1139.0 228.2
2.01 1184.1 228.1
2.84 1229.6 228.0
1.92 1275.5 227.9
4.35 1322.0 227.8
1.20 1368.8 227.7
2.27 1415.9 227.6
4.06 1463.4 227.5
2.33 1511.3 227.4
3.21 1559.6 227.3
1.46 1608.0 227.2
5.18 1656.8 227.1
.74 1705.8 227.0
.80 1754.9 226.8
.33 1804.0 226.7
.60 1853.1 226.7
1.17 1902.3 226.6
.67 1951.6 226.5
.33 2000.8 226.4
1.77 2050.1 226.3
1.16 2099.2 226.2
2.49 2148.1 226.2
.75 2196.9 226.1
Survey
HORIZONTAL
COORDINATES
feet
697.93 S 784.74 W
728.38 S 816.76 W
759.40 S 848.90 W
790.90 S 881.21 W
822.82 S 913.72 W
855.08 S 946.48 W
887.87 S 979.42 W
921.14 S 1012.48 W
954.62 S 1045.68 W
988.54 S 1079.06 W
1022.93 S 1112.54 W
1057.73 S 1146.05 W
1092.85 S 1179.59 W
1128.41 S 1213.11 W
1164.31 S 1246.65 W
1200.23 S 1280.25 W
1236.12 S 1313.92 W
1272.02 S 1347.59 W
1308.01 S 1381.26 W
1344.02 S 1415.00 W
1379.99 S 1448.79 W
1415.91 S 1482.54 W
1451.71 S 1516.24 W
1487.35 S 1549.89 W
1522.87 S 1583.48 W
Page
A Gyrodat a Di re c t i ona i Survey
B.P. EXPLORATION
L PAD, WELL NO. MPL-34I
MILNE POINT FIELD, ALASKA
Job Number: A0797GCE411
Page
MEASURED
DEPTH
feet
I N C L AZIMUTH VERTICAL
DEPTH
deg. deg. feet
VERTICAL DOGLEG CLOSURE
SECTION SEVERITY DIST. AZIMUTH
feet deg./ feet deg.
100 ft.
HORIZONTAL
COORDINATES
feet
4750.0 77.80 223.20 3466.3
4800.0 77.92 223.20 3476.8
4850.0 77.90 223.32 3487.3
4900.0 77.86 223.44 3497.8
4950.0 78.05 223.76 3508.2
2245.4 .46 2245.7 226.1
2294.2 .22 2294.6 226.0
2343.1 .24 2343.4 225.9
2392.0 .25 2392.2 225.9
2440.9 .73 2441.1 225.8
1558.44 S
1594.07 S
1629.68 S
1665.21 S
1700.62 S
1616.97 W
1650.43 W
1683.93 W
1717.51 W
1751.23 W
50O0
5050
5100
5150
5200
.0 78.91 224.38 3518.2
.0 79.63 224.56 3527.5
.0 80.19 224.53 3536.3
.0 80.42 224.50 3544.7
.0 80.61 224.80 3553.0
2489.8 2.11 2490.1 225.8
2539.0 1.47 2539.2 225.8
2588.2 1.12 2588.4 225.8
2637.5 .47 2637.7 225.7
2686.8 .71 2687.0 225.7
1735.82 S
1770.88 S
1805.96 S
1841.11 S
1876.19 S
1785.31 W
1819.72 W
1854.25 W
1888.80 W
1923.46 W
5250
5300
5350
5400
5450
.0 80.46 224.59 3561.2
.0 80.65 224.61 3569.4
.0 80.79 224.38 3577.5
.0 79.50 224.36 3586.0
.0 79.24 224.24 3595.2
2736.1 .52 2736.3 225.7
2785.4 .39 2785.6 225.7
2834.8 .52 2834.9 225.7
2884.0 2.57 2884.2 225.6
2933.2 .57 2933.3 225.6
1911.25 S
1946.37 S
1981.57 S
2016.78 S
2051.95 S
1958.15 W
1992.78 W
2027.36 W
2061.81 W
2096.13 W
55O0
5550
5600
5650
5700
.0 79.02 224.37 3604.7
.0 78.11 224.52 3614.6
.0 77.26 224.62 3625.2
.0 77.37 225.00 3636.2
.0 76.94 225.12 3647.3
2982.3 .51 2982.4 225.6
3031.3 1.84 3031.4 225.6
3080.1 1.71 3080.2 225.6
3128.9 .77 3129.0 225.5
3177.6 .90 3177.8 225.5
2087.09 S
2122.08 S
2156.88 S
2191.49 S
2225.92 S
2130.43 W
2164.75 W
2199.03 W
2233.40 W
2267.91 W
5750.0 76.60 225.18 3658.8
5800.0 76.40 225.30 3670.4
5850.0 77.15 225.60 3681.9
5900.0 77.30 225.69 3692.9
5950.0 77.97 225.73 3703.7
3226.3 .69 3226.4 225.5
3274.9 .46 3275.0 225.5
3323.6 1.60 3323.7 225.5
3372.4 .35 3372.5 225.5
3421.2 1.35 3421.3 225.5
2260.24 S
2294.48 S
2328.62 S
2362.71 S
2396.82 S
2302.42 W
2336.94 W
2371.63 W
2406.49 W
2441.46 W
A Gyroda t a Di rec t i onal
B.P. EXPLORATION
L PAD, WELL NO. MPL-34I
MILNE POINT FIELD, ALASKA
Job Number: A0797GCE411
MEASURED
DEPTH
feet
I N C L AZIMUTH VERTICAL
DEPTH
deg. deg. feet
VERTICAL DOGLEG CLOSURE
SECTION SEVERITY DIST. AZIMUTH
feet deg./ feet deg.
100 ft.
6000.0
6050.0
6100.0
6150.0
6200.0
77.77 226.01 3714.2
77.90 226.29 3724.7
78.44 226.88 3734.9
78.65 226.97 3744.9
79.57 227.35 3754.3
3470.1 .67 3470.2 225.5
3518.9 .61 3519.1 225.5
3567.9 1.58 3568.0 225.6
3616.8 .46 3617.0 225.6
3665.9 1.97 3666.1 225.6
6250.0
6300.0
6350.0
6400.0
6450.0
80.19 227.68 3763.1
80 . 73 227.93 3771.4
80.80 228.06 3779.4
80.72 228.27 3787.5
80 . 74 228 . 63 3795 . 5
3715.1 1.41 3715.3 225.6
3764.3 1.18 3764.5 225.7
3813.6 .29 3813.9 225.7
3862.9 .44 3863.2 225.7
3912.2 .72 3912.5 225.7
6500.0
6550.0
6600.0
6650.0
6700.0
80.92 229.14 3803.5
80.51 229.27 3811.5
80.00 229.70 3820.0
79.39 229.95 3828.9
78.90 229.96 3'838.4
3961.4 1.06 3961.7 225.8
4010.6 .85 4011.0 225.8
4059.8 1.34 4060.2 225.9
4108.8 1.31 4109.3 225.9
4157.7 .99 4158.2 226.0
6750.0
6800.0
6850.0
6900.0
6950.0
78.33 230.12 3848.2
78.02 229.87 3858.5
79.08 229.58 3868.4
79.66 229.49 3877.6
79.67 229.58 3886.6
4206.5 1.18 4207.1 226.0
4255.3 .80 4256.0 226.1
4304.1 2.21 4304.9 226.1
4353.1 1.16 4353.9 226.1
4402.2 .18 4403.0 226.2
7000.0
7050.0
7100.0
7150.0
7200.0
79.53 229.46 3895.6
79.25 229.55 3904.8
79.46 229.53 3914.1
79.24 229.70 3923.3
78.98 229.93 3932.8
4451.2 .37 4452.1 226.2
4500.2 .58 4501.2 226.3
4549.2 .41 4550.2 226.3
4598.2 .55 4599.3 226.3
4647.1 .70 4648.3 226.4
Survey
HORIZONTAL
COORDINATES
feet
2430.86 S 2476.54 W
2464.72 S 2511.79 W
2498.35 S 2547.34 W
2531.82 S 2583.14 W
2565.20 S 2619.14 W
2598.45 S 2655.44 W
2631.56 S 2691.97 W
2664.59 S 2728.64 W
2697.51 S 2765.41 W
2730.24 S 2802.34 W
2762.70 S 2839.52 W
2794.94 S 2876.88 W
2826.95 S 2914.34 W
2858.69 S 2951.93 W
2890.28 S 2989.52 W
2921.76 S
2953.22 S
2984.89 S
3016.78 S
3048.70 S
3080.63 S
3112.54 S
3144.43 S
3176.27 S
3207.95 S
3027.10 W
3064.58 W
3101.97 W
3139.36 W
3176.79 W
3214.19 W
3251.57 W
3288.96 W
3326.38 W
3363.90 W
Page
A Gyrodat a Di re c t ional Survey
B.P. EXPLORATION
L PAD, WELL NO. MPL-34I
MILNE POINT FIELD, ALASKA
Job Number: A0797GCE411
Page
MEASURED I N C L AZIMUTH VERTICAL
DEPTH DEPTH
feet deg. deg. feet
VERTICAL DOGLEG CLOSURE
SECTION SEVERITY DIST. AZIMUTH
feet deg./ feet deg.
100 ft.
HORIZONTAL
COORDINATES
feet
7250 . 0 77 . 76 229 . 96 3942 . 8
7300.0 77.62 230.05 3953.5
7350.0 77.65 230.10 3964.2
7400 . 0 77 . 59 230 . 20 3974 . 9
7450 . 0 77 . 43 229 . 78 3985 . 8
4695.9 2.43 4697.2 226.4
4744.6 .33 4745.9 226.4
4793.2 .12 4794.7 226.5
4841.8 .23 4843.4 226.5
4890.5 .89 4892.1 226.5
3239.46 S
3270.86 S
3302.20 S
3333.49 S
3364.88 S
3401.38 W
3438.81 W
3476.26 W
3513.76 W
3551.15 W
7500.0 76.71 228.47 3996.9
7550.0 77.02 228.02 4008.3
7600.0 76.91 227.41 4019.6
7650.0 77.24 226.72 4030.8
7700.0 77.29 226.27 4041.8
4939 . 1 2 . 93 4940 . 8 226 . 6
4987.7 1.09 4989.5 226.6
5036.4 1.21 5038.2 226.6
5085.1 1.49 5086.9 226.6
5133.8 .90 5135.7 226.6
3396.76 S
3429.19 S
3461.97 S
3495.16 S
3528.73 S
3588.00 W
3624.32 W
3660.36 W
3696.04 W
3731.41 W
7750.0 77.60 225.90 4052.7
7800.0 77.51 225.71 4063.4
7850.0 78.60 226.06 4073.8
7900.0 78.19 226.08 4083.8
7950.0 77.26 225.65 4094.5
5182.6 .94 5184.5 226.6
5231.4 .41 5233.3 226.6
5280.3 2.27 5282.2 226.6
5329.3 .82 5331.2 226.6
5378.2 2.04 5380.1 226.6
3562.58 S
3596.62 S
3630.67 S
3664.65 S
3698.67 S
3766.57 W
3801.57 W
3836.69 W
3871.96 W
3907.03 W
8000.0 77.39 225.51 4105.4
8050 . 0 78 . 22 224 . 93 4116 . 0
8100 . 0 78 . 48 224 . 87 4126 . 1
8150 . 0 79 . 28 224 . 84 4135 . 8
8200 . 0 78 . 96 224 . 99 4145 . 2
5426.9 .39 5428.8 226.6
5475.8 2.00 5477.7 226.5
5524.8 .54 5526.6 226.5
5573.8 1.60 5575.7 226.5
5622.9 .70 5624.8 226.5
3732.81 S
3767.24 S
3801.92 S
3836.70 S
3871.48 S
3941.87 W
3976.56 W
4011.12 W
4045.73 W
4080.39 W
8250.0 78.95 224.94 4154.8
8300.0 78.74 224.82 4164.5
8350.0 78.66 224.86 4174.2
8400.0 78.42 224.71 4184.2
8450.0 78.24 224.64 4194.3
5672.0 .09 5673.8 226.5
5721.1 .47 5722.9 226.5
5770.1 .18 5771.9 226.5
5819.1 .57 5820.8 226.4
5868.1 .39 5869.8 226.4
3906.20 S
3940.96 S
3975.72 S
4010.51 S
4045.33 S
4115.07 W
4149.69 W
4184.26 W
4218.78 W
4253.21 W
A Gyroda t a Di r e c t i ona i Survey
B.P. EXPLORATION
L PAD, WELL NO. MPL-34I
MILNE POINT FIELD, ALASKA
Job Number: A0797GCE411
Page
MEASURED I N C L AZIMUTH VERTICAL
DEPTH DEPTH
feet deg. deg. feet
VERTICAL DOGLEG CLOSURE
SECTION SEVERITY DIST. AZIMUTH
feet deg./ feet deg.
100 ft.
HORIZONTAL
COORDINATES
feet
8500.0 78.68 224.28 4204.3
8550.0 78.84 224.07 4214.0
8600.0 78.62 223.97 4223.8
8650.0 78.37 223.91 4233.8
8700.0 78.21 223.73 4243.9
5917.1 1.14 5918.7 226.4
5966.1 .52 5967.8 226.4
6015.1 .47 6016.7 226.4
6064.1 .52 6065.7 226.4
6113.1 .48 6114.6 226.3
4080.29 S
4115.46 S
4150.73 S
4186.01 S
4221.33 S
4287.52 W
4321.69 W
4355.77 W
4389.77 W
4423.67 W
8750.0 78.29 223.77 4254.1
8800.0 78.94 223.81 4264.0
8850.0 78.59 223.46 4273.7
8900.0 78.69 223.54 4283.6
8950.0 78.81 223.21 4293.3
6162.0 .17 6163.5 226.3
6211.0 1.31 6212.5 226.3
6260.0 .99 6261.5 226.3
6309.0 .25 6310.4 226.3
6358.0 .70 6359.4 226.2
4256.69 S
4292.07 S
4327.57 S
4363.12 S
4398.77 S
4457.52 W
4491.44 W
4525.28 W
4559.02 W
4592.70 W
9000.0 80.17 223.14 4302.5
9050.0 79.88 223.17 4311.1
9100.0 79.64 222.85 4320.0
9150.0 79.17 222.80 4329.2
9200.0 78.82 222.59 4338.7
6407.2 2.73 6408.5 226.2
6456.4 .58 6457.7 226.2
6505.6 .80 6506.8 226.2
6554.7 .95 6555.9 226.1
6603.7 .80 6604.9 226.1
4434.62 S
4470.54 S
4506.53 S
4542.57 S
4578.65 S
4626.34 W
4660.02 W
4693.58 W
4726.99 W
4760.27 W
9250.0 79.23 222.91 4348.3
9300.0 79.56 222.97 4357.5
9350.0 79.18 222.71 4366.7
9400.0 78.76 222.36 4376.2
9450.0 80.03 222.83 4385.4
6652.8 1.02 6653.9 226.1
6701.9 .67 6702.9 226.1
6751.0 .91 6752.0 226.0
6800.0 1.08 6801.0 226.0
6849.1 2.70 6850.0 226.0
4614.69 S
4650.67 S
4686.70 S
4722.86 S
4759.04 S
4793.59 W
4827.07 W
4860.49 W
4893.66 W
4926.93 W
9500.0 80.29 222.92 4394.0
9550.0 80.18 222.53 4402.5
9600.0 80.11 222.82 4411.0
9650.0 80.34 223.76 4419.5
9700.0 80.19 224.11 4428.0
6898.3 .55 6899.2 226.0
6947.6 .81 6948.4 225.9
6996.8 .58 6997.6 225.9
7046.1 1.92 7046.8 225.9
7095.3 .75 7096.1 225.9
4795.15 S
4831.34 S
4867.56 S
4903.43 S
4938.91 S
4960.45 W
4993.88 W
5027.27 W
5061.06 W
5095.25 W
A Gyrodat a Di rec t i ona i Survey
B.P. EXPLORATION
L PAD, WELL NO. MPL-34I
MILNE POINT FIELD, ALASKA
Job Number: A0797GCE411
Page
MEASURED
DEPTH
feet
I N C L AZIMUTH VERTICAL
DEPTH
deg. deg. feet
VERTICAL DOGLEG CLOSURE
SECTION SEVERITY DIST. AZIMUTH
feet deg./ feet deg.
100 ft.
HORIZONTAL
COORDINATES
feet
9750.0 80.17 225.05 4436.5
9800.0 79.57 225.22 4445.3
9850.0 79.92 224.85 4454.2
9900.0 80.20 224.28 4462.8
9950.0 79.78 223.79 4471.5
7144.6 1.85 7145.3 225.9
7193.8 1.24 7194.6 225.9
7243.0 1.03 7243.8 225.9
7292.3 1.24 7293.0 225.9
7341.5 1.29 7342.2 225.9
4974.00 S
5008.72 S
5043.49 S
5078.58 S
5113.98 S
5129.83 W
5164.72 W
5199.53 W
5234.09 W
5268.32 W
10000.0 79.97 223.49 4480.3
10050.0 80.22 223.27 4488.9
10100.0 80.11 222.97 4497.4
10150.0 79.84 222.75 4506.2
10200.0 80.24 222.51 4514.8
7390.7 .70 7391.4 225.8
7439 . 9 . 68 7440 . 6 225 . 8
7489.2 .63 7489.8 225.8
7538.4 .69 7539.0 225.8
7587.6 .93 7588.2 225.8
5149.60 S
5185.40 S
5221.36 S
5257.45 S
5293.69 S
5302.29 W
5336.12 W
5369.79 W
5403.28 W
5436.63 W
10250.0 80.27 222.23 4523.3
10300.0 80.42 222.02 4531.6
10350.0 80.40 221.74 4540.0
10400.0 80.79 221.55 4548.1
10450.0 80.58 222.48 4556.2
7636.8 .57 7637.3 225.7
7686.0 .50 7686.5 225.7
7735.2 .56 7735.7 225.7
7784.5 .86 7784.9 225.7
7833.8 1.88 7834.2 225.6
5330.10 S
5366.66 S
5403.37 S
5440.23 S
5476.88 S
5469.84 W
5502.90 W
5535.81 W
5568.59 W
5601.61 W
10500.0 80.54 223.14 4564.4
10550.0 80.56 222.94 4572.6
10600.0 80.40 222.64 4580.9
10650.0 79.46 223.32 4589.7
10700.0 78.98 223.64 4599.0
7883.0 1.31 7883.4 225.6
7932.3 .40 7932.7 225.6
7981.6 .67 7982.0 225.6
8030.8 2.31 8031.1 225.6
8079.9 1.15 8080.2 225.6
5513.07 S
5549.11 S
5585.30 S
5621.32 S
5656.96 S
5635.14 W
5668.80 W
5702.30 W
5735.86 W
5769.65 W
10750.0 78.49 224.95 4608.8
10800.0 78.37 225.32 4618.8
10850.0 79.00 226.56 4628.6
10900.0 78.96 226.60 4638.2
10950.0 78.82 226.46 4647.8
8128.9 2.75 8129.3 225.6
8177.9 .77 8178.2 225.6
8226.9 2.73 8227.3 225.6
8276.0 .11 8276.3 225.6
8325.0 .39 8325.4 225.6
5692.06 S
5726.61 S
5760.70 S
5794.44 S
5828.19 S
5803.89 W
5838.61 W
5873.84 W
5909.49 W
5945.10 W
B.P. EXPLORATION
L PAD, WELL NO. MPL-34I
MILNE POINT FIELD, ALASKA
Job Number: A0797GCE411
A Gy r o da t a
MEASURED I N C L AZIMUTH VERTICAL
DEPTH DEPTH
feet deg. deg. feet
VERTICAL
SECTION
feet
11000.0 78.71 226.18 4657.6
11050.0 78.56 225.98 4667.4
11100.0 78.33 225.79 4677.4
11150.0 78.02 225.56 4687.7
11200.0 77.60 225.37 4698.2
11250.0 77.31 224.90 4709.1
11300.0 78.05 224.49 4719.8
11350.0 78.43 224.05 4729.9
11400.0 78.41 223.79 4740.0
11450.0 78.07 223.48 4750.2
11500.0 77.72 223.15 4760.7
11550.0 77.63 222.95 4771.3
11600.0 78.61 223.71 4781.6
11650.0 78.99 223.73 4791.3
11700.0 78.82 223.43 4801.0
11750.0 79.10 223.27 4810.5
11800.0 80.18 224.16 4819.5
11850.0 80.30 224.18 4828.0
11900.0 80.15 223.75 4836.5
11950.0 79.87 223.93 4845.2
12000.0 79.94 224.46 4853.9
12050.0 80.31 225.42 4862.5
12100.0 80.34 226.18 4870.9
12150.0 80.64 225.81 4879.2
12200.0 80.66 225.43 4887.3
8374.1
8423.1
84 72.1
8521.0
8569.9
8618.7
8667.5
8716.5
8765.4
8814.4
8863.2
8912.1
8961.0
9010.0
9059.1
9108.1
9157.3
9206.5
9255.8
9305.0
9354.3
9403.5
9452.8
9502.1
9551.4
Directional
DOGLEG CLOSURE
SEVERITY DIST. AZIMUTH
deg./ feet deg.
100 ft.
58 8374.4 225.6
52 8423.4 225.6
57 8472.4 225.6
78 8521.4 225.6
92 8570.2 225.6
o
10 8619.0 225.6
69 8667.9 225.6
14 8716.8 225.6
51 8765.8 225.6
90 8814.7 225.5
97 8863.6 225.5
42 8912.4 225.5
47 8961.3 225.5
77 9010.3 225.5
68 9059.3 225.5
63 9108.4 225.5
78 9157.5 225.5
24 9206.8 225.5
89 9256.0 225.4
66 9305.3 225.4
o
05 9354.5 225.4
03 9403.7 225.4
51 9453.0 225.4
93 9502.3 225.4
77 9551.7 225.4
Survey
HORIZONTAL
COORDINATES
feet
5862.06 S
5896.06 S
5930.16 S
5964.36 S
5998.64 S
6033.07 S
6067.79 S
6102.85 S
6138.13 S
6173.56 S
6209.13 S
6244.82 S
6280.41 S
6315.86 S
6351.41 S
6387.09 S
6422.64 S
6457.99 S
6493.45 S
6528.97 S
6564.27 S
6599.14 S
6633.50 S
6667.76 S
6702.26 S
5980.57 W
6015.88 W
6051.04 W
6086.06 W
6120.89 W
6155.48 W
6189.84 W
6224.00 W
6257.98 W
6291.76 W
6325.30 W
6358.64 W
6392.22 W
6426.12 W
6459.94 W
6493.63 W
6527.61 W
6561.95 W
6596.16 W
6630.26 W
6664.58 W
6699.37 W
6734.70 W
6770.17 W
6805.43 W
Page
A Gyroda t a Di rec t i ona i Survey
B.P. EXPLORATION
L PAD, WELL NO. MPL-34I
MILNE POINT FIELD, ALASKA
Job Number: A0797GCE411
Page
10
MEASURED I N C L AZIMUTH VERTICAL
DEPTH DEPTH
feet deg. deg. feet
VERTICAL DOGLEG CLOSURE
SECTION SEVERITY DIST. AZIMUTH
feet deg./ feet deg.
100 ft.
HORIZONTAL
COORDINATES
feet
12250 . 0 80 . 61 224 . 97 4895 . 4
12300 . 0 80 . 39 224 . 37 4903 . 7
12350 . 0 80 . 36 223 . 83 4912 . 0
12400 . 0 80 . 51 223 . 61 4920 . 3
12450 . 0 80 . 60 224 . 47 4928 . 5
9600.8 .90 9601.0 225.4
9650.1 1.27 9650.3 225.4
9699.4 1.07 9699.6 225.4
9748.7 .52 9748.9 225.4
9798.0 1.71 9798.2 225.4
6737.03 S 6840.44 W
6772.10 S 6875.11 W
6807.50 S 6909.41 W
6843.13 S 6943.49 W
6878.59 S 6977.77 W
12500.0 80.70 224.63 4936.7
12550.0 80.89 225.67 4944.7
12600.0 80.72 225.27 4952.7
12650.0 80.68 224.71 4960.7
12700.0 80.56 224.12 4968.9
9847.3 .38 9847.5 225.4
9896.7 2.09 9896.9 225.4
9946.0 .87 9946.2 225.4
9995.4 1.10 9995.6 225.4
10044.7 1.18 10044.9 225.4
6913.75 S
6948.56 S
6983.17 S
7018.07 S
7053.30 S
7012.38 W
7047.38 W
7082.56 W
7117.45 W
7151.97 W
12750.0 80.86 223.80 4977.0
12800.0 81.07 224.21 4984.8
12850.0 81.19 224.58 4992.5
12900.0 81.29 224.36 5000.1
12950.0 81.22 224.12 5007.7
10094.0 .88 10094.2 225.4
10143.4 .92 10143.6 225.4
10192.8 .77 10193.0 225.4
10242.2 .47 10242.4 225.4
10291.6 .50 10291.8 225.4
7088.82 S
7124.34 S
7159.64 S
7194.91 S
7230.31 S
7186.22 W
7220.53 W
7255.09 W
7289.70 W
7324.18 W
13000.0 80.93 223.68 5015.5
13050.0 80.55 223.14 5023.5
13100.0 80.16 222.63 5031.9
13150.0 79.83 222.50 5040.6
13200.0 79.40 223.43 5049.6
10341.0 1.05 10341.2 225.4
10390.3 1.30 10390.5 225.4
10439.6 1.27 10439.7 225.3
10488.8 .71 10488.9 225.3
10537.9 2.02 10538.1 225.3
7265.90 S
7301.75 S
7337.87 S
7374.14 S
7410.13 S
7358.43 W
7392.34 W
7425.89 W
7459.19 W
7492.71 W
13250.0 79.03 223.03 5059.0
13300.0 78.74 222.47 5068.6
13350.0 78.82 222.51 5078.3
13400.0 79.09 223.19 5087.9
13450.0 79.15 223.80 5097.4
10587.0 1.08 10587.1 225.3
10636.1 1.23 10636.2 225.3
10685.1 .17 10685.1 225.3
10734.1 1.45 10734.2 225.3
10783.2 1.20 10783.3 225.3
7445.91 S
7481.94 S
7518.11 S
7554.09 S
7589.70 S
7526.35 W
7559.65 W
7592.78 W
7626.16 W
7659.95 W
A Gyroda t a Di rec t i onal
B.P. EXPLORATION
L PAD, WELL NO. MPL-34I
MILNE POINT FIELD, ALASKA
Job Number: A0797GCE411
MEASURED I N C L AZIMUTH VERTICAL
DEPTH DEPTH
feet deg. deg. feet
VERTICAL DOGLEG CLOSURE
SECTION SEVERITY DIST. AZIMUTH
feet deg./ feet deg.
100 ft.
13500.0 79.36 224.36 5106.7
13550.0 79.52 224.93 5115.8
13600.0 79.36 225.28 5125.0
13650.0 79.14 224.86 5134.3
13700.0 79.00 224.69 5143.8
10832.3 1.17 10832.4 225.3
10881.4 1.17 10881.5 225.3
10930.6 .76 10930.7 225.3
10979.7 .94 10979.8 225.3
11028.8 .44 11028.9 225.3
13750.0 79.39 225.57 5153.2
13800.0 79.18 225.84 5162.5
13850.0 79.65 226.81 5171.7
13900.0 79.80 226.76 5180.6
13950.0 79.55 226.55 5189.5
11077.9 1.88 11078.0 225.3
11127.1 .68 11127.1 225.3
11176.2 2.13 11176.3 225.3
11225.4 .33 11225.4 225.3
11274.5 .63 11274.6 225.3
14000 . 0 79 . 36 226 . 20 5198 . 7
14050 . 0 79 . 12 225.89 5208 . 0
14100 . 0 79 . 37 226 . 29 5217 . 4
14150 . 0 79 . 80 227 . 02 5226.4
14200 . 0 79 . 78 226 . 90 5235 . 3
11323.7 .80 11323.8 225.3
11372.8 .76 11372.9 225.3
11421.9 .93 11422.0 225.3
11471.1 1.67 11471.2 225.3
11520.2 .25 11520.3 225.3
14250.0 79.77 226.46 5244.1
14300.0 79.58 226.18 5253.1
14350.0 79.37 225.87 5262.2
14400.0 79.11 225.46 5271.6
14450.0 78.92 225.08 5281.1
11569.4 .86 11569.5 225.3
11618.6 .66 11618.7 225.3
11667.8 .74 11667.9 225.3
11716.9 .96 11717.0 225.3
11766.0 .84 11766.1 225.3
14500.0 78.68 224.73 5290.8
14550.0 78.66 224.59 5300.6
14600.0 78.45 224.36 5310.5
14650.0 78.40 224.33 5320.6
14700.0 78.13 224.15 5330.7
11815.0 .83 11815.1 225.3
11864.0 .29 11864.1 225.3
11913.0 .61 11913.1 225.3
11962.0 .13 11962.1 225.3
1201i.0 .65 12011.1 225.3
Survey
Page
HORIZONTAL
COORDINATES
feet
7624.99 S 7694.13 W
7659.96 S 7728.67 W
7694.65 S 7763.49 W
7729.34 S 7798.27 W
7764.19 S 7832.85 W
7798.84 S
7833.15 S
7867.09 S
7900.78 S
7934.54 S
7968.46 S
8002.55 S
8036.61 S
8070.37 S
8103.95 S
8137.71 S
8171.68 S
8205.82 S
8240.15 S
8274.69 S
8309.43 S
8344.30 S
8379.27 S
8414.30 S
8449.37 S
7867.66 W
7902.82 W
7938.37 W
7974.22 W
8010.00 W
8045.58 W
8080.94 W
8116.33 W
8152.10 W
8188.06 W
8223.86 W
8259.43 W
8294.81 W
8329.94 W
8364.81 W
8399.44 W
8433.90 W
8468.23 W
8502.47 W
8536.62 W
11
A Gyrodata
B.P. EXPLORATION
L PAD, WELL NO. MPL-34I
MILNE POINT FIELD, ALASKA
Job Number: A0797GCE411
MEASURED I N C L AZIMUTH VERTICAL
DEPTH DEPTH
feet deg. deg. feet
VERTICAL
SECTION
feet
14750.0 78.11 224.01 5341.0 12059.9
14800.0 77.97 223.82 5351.4 12108.8
14850.0 77.75 223.62 5361.9 12157.7
14900.0 77.87 223.46 5372.5 12206.5
14950.0 77.80 223.21 5383.0 12255.4
15000.0 77.70 222.96 5393.6
15050.0 77.55 222.79 5404.3
15100.0 77.34 222.42 5415.2
15150.0 77.21 222.09 5426.2
15200.0 76.96 221.72 5437.4
15250.0 76.70 221.49 5448.8
15300.0 76.57 221.18 5460.3
15350.0 76.47 220.93 5472.0
15400.0 76.26 220.83 5483.8
15450.0 76.40 221.33 5495.6
12304.2
12353.0
12401.8
12450.5
12499.1
12547.7
12596.3
12644.8
12693.2
12741.7
15500.0 76.62 222.16 5507.3 12790.3
15550.0 76.56 222.71 5518.8 12838.8
15600.0 76.53 223.19 5530.5 12887.4
15650.0 76.42 223.00 5542.2 12936.0
15700.0 76.10 222.61 5554.0 12984.6
15750.0 76.05 222.35 5566.1
15800.0 75.88 222.07 5578.2
15850.0 75.59 221.76 5590.5
15900.0 75.31 221.67 5603.1
15950.0 75.06 222.38 5615.9
13033.0
13081.5
13129.9
13178.2
13226.5
Directional
DOGLEG CLOSURE
SEVERITY DIST. AZIMUTH
deg./ feet deg.
100 ft.
.26 12060.0 225.3
.48 12108.9 225.3
.58 12157.8 225.3
.39 12206.6 225.3
.50 12255.5 225.3
.54 12304.3 225.3
.43 12353.1 225.2
.84 12401.8 225.2
.70 12450.5 225.2
.87 12499.2 225.2
.70 12547.8 225.2
.65 12596.3 225.2
.51 12644.8 225.2
.46 12693.3 225.1
.01 12741.7 225.1
.67 12790.3 225.1
.08 12838.8 225.1
.95 12887.4 225.1
.43 12936.0 225.1
.99 12984.6 225.1
.53 13033.0 225.1
.63 13081.5 225.1
.84 13129.9 225.1
.59 13178.2 225.0
1.47 13226.5 225.0
Survey
HORIZONTAL
COORDINATES
feet
8484.52 S
8519.76 S
8555.09 S
8590.52 S
8626.07 S
8661.76 S
8697.55 S
8733.47 S
8769.57 S
8805.84 S
8842.25 S
8878.77 S
8915.44 S
8952.18 S
8988.80 S
9025.07 S
9060.97 S
9096.56 S
9132.06 S
9167.69 S
9203.48 S
9239.41 S
9275.47 S
9311.60 S
9347.50 S
8570.66 W
8604.59 W
8638.37 W
8672.03 W
8705.58 W
8738.95 W
8772.18 W
8805.22 W
8838.01 W
8870.56 W
8902.89 W
8935.02 W
8966.95 W
8998.76 W
9030.68 W
9063.05 W
9095.87 W
9129.00 W
9162.22 W
9195.22 W
9228.00 W
9260.59 W
9292.96 W
9325.16 W
9357.52 W
Page
12
A Gyroda t a Di rec t i ona i Survey
B.P. EXPLORATION
L PAD, WELL NO. MPL-34I
MILNE POINT FIELD, ALASKA
Job Number: A0797GCE411
Page
13
MEASURED
DEPTH
feet
I N C L AZIMUTH VERTICAL
DEPTH
deg. deg. feet
VERTICAL
SECTION
feet
DOGLEG CLOSURE
SEVERITY DIST. AZIMUTH
deg. / feet deg.
100 ft.
HORIZONTAL
COORDINATES
feet
160
160
161
161
162
00.0
50.0
00.0
50.0
00.0
74.72 222.~8 5628.9 13274.7
74.74 222.I9 5642.1 13322.8
74.29 222.29 5655.4 13371.0
72.95 222.81 5669.5 13418.9
72.47 222.83 5684.4 13466.6
.71 13274.7 225.0
.17 13322.8 225.0
.91 13371.0 225.0
.85 13418.9 225.0
.96 13466.6 225.0
9383.19 S 9390.03 W
9418.90 S 9422.46 W
9454.57 S 9454.85 W
9489.91 S 9487.29 ~W
9524.93 S 9519.74 W
162
163
163
164
164
50.0
00.0
50.0
00.0
50.0
70.99 222.86 5700.1 13514.0
70.38 223.03 5716.6 13561.2
68.39 224.05 5734.2 13608.0
67.30 224.48 5753.1 13654.3
66.04 225.29 5772.9 13700.2
2.96 13514.1 225.0
1.27 13561.2 225.0
4.41 13608.0 225.0
2.32 13654.3 225.0
2.93 13700.2 225.0
9559.74 S 9552.02 W
9594.28 S 9584.17 W
9628.20 S 9616.40 W
9661.36 S 9648.72 W
9693.89 S 9681.12 W
165
165
166
166
167
00.0
5O.O
00.0
50.0
00.0
64.96 225.98 5793.6 13745.7
63.95 226.61 5815.2 13790.8
62.27 226.76 5837.8 13835.4
60.89 226.79 5861.6 13879.3
59.14 226.66 5886.5 13922.6
2.48 13745.7 225.0
2.32 13790.8 225.0
3.36 13835.4 225.0
2.77 13879.3 225.0
3.52 13922.6 225.0
9725.71 S
9756.88 S
9787.47 S
9817.59 S
9847.27 S
9713.65 W
9746.26 W
9778.70 W
9810.74 W
9842.27 W
167
168
168
169
169
50.0
00.0
50.0
00.0
50.0
58.45 226.76 5912.5 13965.4
56.39 227.25 5939.4 14007.5
55.36 227.56 5967.4 14048.8
53.27 228.21 5996.6 14089.4
52.41 228.39 6026.8 14129.2
1.38 13965.4 225.0
4.20 14007.5 225.0
2.13 14048.8 225.0
4.32 14089.4 225.0
1.73 14129.2 225.0
9876.60 S
9905.33 S
9933.35 S
9960.58 S
9987.09 S
9873.40 W
9904.21 W
9934.68 W
9964.80 W
9994.55 W
170
170
171
171
172
00.0
50.0
00.0
50.0
00.0
50.54 229.02 6057.9 14168.2
49.48 229.48 6090.1 14206.4
47.56 229.79 6123.2 14243.7
46.06 229.82 6157.4 14280.1
44.35 230.53 6192.6 14315.4
3.87 14168.2 225.0
2.24 14206.4 225.0
3.88 14243.7 225.1
3.00 14280.1 225.1
3.57 14315.4 225.1
10012.91 S
10037.92 S
10062.18 S
10085.70 S
10108.43 S
10023.94 W
10052.96 W
10081.50 W
10109.34 W
10136.59 W
A Gyrodat a Di rec t ional Survey
B.P. EXPLORATION
L PAD, WELL NO. MPL-34I
MILNE POINT FIELD, ALASKA
Job Number: A0797GCE411
Page
14
MEASURED I N C L AZIMUTH VERTICAL
DEPTH DEPTH
feet deg. deg. feet
VERTICAL DOGLEG CLOSURE
SECTION SEVERITY DIST. AZIMUTH
feet deg./ feet deg.
100 ft.
HORIZONTAL
COORDINATES
feet
17250.0 42.36 230.37 6229.0
17300.0 41.28 230.09 6266.3
17350.0 38.78 231.03 6304.5
17400.0 37.17 231.85 6343.9
17450.0 35.52 232.25 6384.2
14349.6 3.98 14349.6 225.1
14382.8 2.18 14382.8 225.1
14414.8 5.15 14414.8 225.1
14445.3 3.38 14445.4 225.1
14474.8 3.33 14474.8 225.1
10130.28 S
10151.61' S
10172.04 S
10191.22 S
10209.44 S
10163.05 W
10188.67 W
10213.50 W
10237.56 W
10260.92 W
17500.0 34.88 232.24 6425.1
17550.0 34.71 231.97 6466.1
17600.0 34.28 232.05 6507.3
17650.0 33.91 232.12 6548.8
17700.0 33.89 232.08 6590.3
14503.4 1.27 14503.4 225.2
14531 . 7 . 46 14531 . 7 225 . 2
14559 . 8 . 87 14559 . 8 225 . 2
14587 . 6 . 75 14587 . 6 225 . 2
14615 . 3 . 06 14615 . 3 225 . 2
10227.09 S
10244.61 S
10262.04 S
10279.26 S
10296.39 S
10283.71 W
10306.23 W
10328.54 W
10350.65 W
10372.66 W
17750.0 33.48 232.13 6631.9
17800.0 33.29 232.05 6673.6
17850.0 33.20 231.78 6715.4
17900.0 32.87 231.46 6757.3
17950.0 32.38 230.91 6799.5
14642.8 .83 14642.9 225.2
14670.1 .38 14670.2 225.2
14697.3 .35 14697.4 225.2
14724.4 .76 14724.5 225.3
14751.2 1.13 14751.3 225.3
10313.42 S
10330.33 S
10347.23 S
10364.16 S
10381.05 S
10394.54 W
10416.25 W
10437.83 W
10459.19 W
10480.20 W
18000.0 32.16 231.08 6841.7
18050.0 31.85 230.92 6884.1
18100.0 31.43 230.70 6926.7
14777.7 .49 14777.9 225.3
14804.1 .65 14804.2 225.3
14830.2 .86 14830.3 225.3
10397.86 S
10414.53 S
10431.11 S
10500.94 W
10521.54 W
10541.86 W
Final Station Closure: Distance: 14830.34 ft Az: 225.30 deg.
A Gyrodat a Di rec t iona i Survey
for
B.P. EXPLORATION
L PAD, WELL NO. MPL-34I
MILNE POINT FIELD, ALASKA
Job Number: SUB411
Run Date: 3-Jul-97 15:00:00
Surveyor: TOM STODDARD
Calculation Method: MINIMUM CURVATURE
Survey Latitude: 70.497000 deg. N
Sub-sea Correction from Vertical Reference: 50.8 ft.
Azimuth Correction:
Gyro: Bearings are Relative to True North
Proposed Well Direction: 225.050 deg
Vertical Section Calculated from Well Head Location
Closure Calculated from Well Head Location
Horizontal Coordinates Calculated from Local Horizontal Reference
A Gyrodata
B.P. EXPLORATION
L PAD, WELL NO. MPL-34I
MILNE POINT FIELD, ALASKA
Job Number: SUB411
SUBSEA
DEPTH
feet
I N C L AZIMUTH VERTICAL
DEPTH
deg. deg. feet
VERTICAL
SECTION
feet
-50
100
200
300
4OO
.8 0.00 0.00 0.0
.0 .18 10.34 150.8
.0 .20 10.81 250.8
.0 .16 97.93 350.8
.0 .25 258.57 450.8
500.0
600.0
700.0
800.0
900.0
1000.0
1100.0
1200.0
1300.0
1400.0
1500.0
1600.0
1700.0
1800.0
1900.0
2000.0
2100.0
2200.0
2300.0
2400.0
.34 312.84 550.8
.30 318.93 650.8
.30 338.38 750.8
.42 314.72 850.8
.96 270.31 950.8
1.92 235.83 1050.8
2.94 229.27 1150.8
4.17 224.62 1250.8
6.12 221.88 1350.8
7.75 221.63 1450.8
8.97 221.75 1550.8
10.75 222.09 1650.8
11.80 221.97 1750.8
12.51 223.19 1850.8
15.18 225.43 1950.8
18.58 229.59 2050.8
22.09 228.70 2150.8
25.33 228.25 2250.8
27.82 228.60 2350.8
31.17 228.95 2450.8
0.0
-.8
1.9
6.1
12.4
21.3
33.5
48.2
65.5
85.4
106.9
131.5
161.3
198.3
242.2
292.3
349.0
Directional
DOGLEG CLOSURE
SEVERITY DIST. AZIMUTH
deg. / feet deg.
100 ft.
.00 0.0 0.0
.10 .5 14.7
.04 .8 12.4
.19 .9 13.3
.40 1.1 10.0
.38 1.5 357.1
.29 1.9 345.3
.20 2.4 341.3
.20 3.0 337.5
.75 3.7 322.3
1.15 5.5 292.5
1.06 9.8 263.6
1.26 16.6 246.6
1.97 26.7 236.9
1.61 40.0 231.3
1.21 55.4 228.3
1.76 73.8 226.6
1.03 94.4 225.5
.78 115.9 224.9
2.70 141.7 224.8
3.49 172.1 225.3
3.27 208.4 226.0
2.86 249.7 226.4
1.90 295.0 226.8
2.56 370.4 227.1
Survey
HORIZONTAL
COORDINATES
feet
0.00 N 0.00 E
.30 N .07 E
.61 N .13 E
.82 N .19 E
.96 N .16 E
1.25 N .19 W
1.62 N .44 W
2.03 N .69 W
2.51 N 1.06 W
2.55 N 2.05 W
1.41 N 4.13 W
1.70 S 7.43 W
5.56 S 11.91 W
12.15 S 18.02 W
21.24 S 26.12 W
32.21 S 35.89 W
45.13 S 47.51 W
59.95 S 60.86 W
75.79 S 75.43 W
93.34 S 92.68 W
113.53 S 114.60 W
137.75 S 142.72 W
166.99 S 175.56 W
200.25 S 213.07 W
237.73 S 255.79 W
Page
A Gyrodata
B.P. EXPLORATION
L PAD, WELL NO. MPL-34I
MILNE POINT FIELD, ALASKA
Job Number: SUB411
SUBSEA
DEPTH
feet
I N C L AZIMUTH VERTICAL
DEPTH
deg. deg. feet
VERTICAL
SECTION
feet
2500.0
2600.0
2700.0
2800.0
2900.0
3000.0
3100.0
3200.0
3300.0
3400.0
3500.0
3600.0
3700.0
3800.0
3900.0
4000.0
4100.0
4200.0
4300.0
4400.0
4500.0
4600.0
4700.0
4800.0
4900.0
34.14 229.58 2550.8
37.18 229.54 2650.8
41.53 230.30 2750.8
46.24 230.29 2850.8
51.31 229.08 2950.8
56.37 227.73 3050.8
62.40 226.34 3150.8
68.52 225.10 3250.8
77.52 223.38 3350.8
77.82 223.39 3450.8
80.56 224.72 3550.8
76.84 225.14 3650.8
79.22 227.21 3750.8
78.25 230.06 3850.8
77.66 230.03 3950.8
77.54 225.97 4050.8
78.95 224.96 4150.8
78.26 223.76 4250.8
79.32 222.93 4350.8
79.79 224.99 4450.8
80.72 221.86 4550.8
78.79 226.37 4650.8
78.05 223.46 4750.8
79.91 224.27 4850.8
80.76 225.36 4950.8
413.0
483.9
565.5
661.8
775.6
912.3
1082.6
1300.4
1625.3
2173.9
2673.8
3192.4
3647.6
4218.7
4732.2
5174.2
5651.6
6146.0
6666.3
7224.2
7800.7
8340.1
8817.3
9336.7
9934.6
Directional
DOGLEG CLOSURE
SEVERITY DIST. AZIMUTH
deg./ feet deg.
100 ft.
2.49 425.5 227.5
3.48 514.4 227.8
3.63 579.3 228.1
2.81 685.0 228.4
3.32 799.5 228.6
2.86 921.5 228.6
2.62 1094.4 228.3
3.30 1322.0 227.8
2.86 1656.8 227.1
1.56 2196.9 226.1
.65 2687.0 225.7
.84 3226.4 225.5
1.41 3666.1 225.6
1.08 4256.0 226.0
.86 4745.9 226.4
.93 5184.5 226.6
.34 5673.8 226.5
.27 6163.5 226.3
.92 6702.9 226.1
.11 7243.8 225.9
1.20 7834.2 225.7
.45 8374.4 225.6
.91 8863.6 225.5
.91 9354.5 225.4
1.15 9946.2 225.4
Survey
Page
H 0 R I Z 0 N T A L
COORDINATE
feet
279.51 S 304.55 W
325.53 S 358.76 W
378.34 S 421.33 W
440.07 S 495.79 W
513.88 S 582.96 W
604.94 S 685.11 W
721.49 S 809.52 W
873.72 S 965.20 W
1106.21 S 1192.18 W
1506.39 S 1567.89 W
1866.97 S 1914.35 W
2236.32 S 2278.36 W
2552.75 S 2605.71 W
2929.62 S 3036.47 W
3262.89 S 3429.30 W
3556.77 S
3891.78 S
4245.14 S
4624.64 S
5030.22 S
5452.27 S
5838.58 S
6175.70 S
6551.70 S
6975.14 S
3760.53 W
4100.68 W
4446.46 W
4802.85 W
5186.25 W
5579.43 W
5955.98 W
6293.78 W
6652.36 W
7074.40 W
A Gyroda t a Di rec t i onal Survey
B.P. EXPLORATION
L PAD, WELL NO. MPL-34I
MILNE POINT FIELD, ALASKA
Job Number: SUB411
Page
SUBSEA
DEPTH
feet
I N C L AZIMUTH VERTICAL
DEPTH
deg. deg. feet
VERTICAL DOGLEG CLOSURE
SECTION SEVERITY DIST. AZIMUTH
feet deg./ feet deg.
100 ft.
HORIZONTAL
COORDINATES
feet
5000.0 79.35 223.38 5050.8
5100.0 79.29 225.34 5150.8
5200.0 79.63 226.25 5250.8
5300.0 77.98 223.83 5350.8
5400.0 76.68 221.43 5450.8
10544.1 1.90 10587.1 225.3
11065.4 1.52 11078.0 225.3
11606.0 .71 11618.7 225.3
12106.0 .46 12108.9 225.3
12556.2 .69 12596.3 225.2
7414.62 S 7496.94 W
7790.03 S 7858.81 W
8162.97 S 8250.30 W
8517.72 S 8602.62 W
8848.64 S 8908.51 W
5500.0 76.19 222.72 5550.8
5600.0 74.44 222.26 5650.8
5700.0 67.43 224.43 5750.8
5800.0 61.52 226.78 5850.8
5900.0 55.97 227.37 5950.8
12971.3 .83 12984.6 225.1
13354.3 .66 13371.0 225.0
13648.7 2.57 13654.3 225.0
13859.4 3.04 13879.3 225.0
14024.3 3.36 14048.8 225.0
9157.94 S 9186.19 W
9442.19 S 9443.61 W
9657.39 S 9644.85 W
9803.97 S 9796.26 W
9916.74 S 9916.62 W
6000.0 50.97 228.88 6050.8
6100.0 46.35 229.81 6150.8
6200.0 41.73 230.21 6250.8
6300.0 36.88 231.92 6350.8
6400.0 34.77 232.07 6450.8
14159 . 3 3 . 38 14168 . 2 225 . 0
14273 . 1 3 . 17 14280 . 1 225 . 1
14369 . 0 2 . 93 14382 . 8 225 . 1
14450 . 4 3 . 37 14474 . 8 225 . 1
14521 . 1 . 77 14531 . 7 225 . 2
10007.00 S 10017.21 W
10081.16 S 10103.97 W
10142.76 S 10178.05 W
10194.32 S 10241.53 W
10238.06 S 10297.81 W
6500.0 33.91 232.12 6550.8
6600.0 33.39 232.10 6650.8
6700.0 32.92 231.51 6750.8
6800.0 32.09 231.04 6850.8
6875.9 31.43 230.70 6926.7
14589 . 0 . 71 14615 . 3 225 . 2
14655 . 2 . 62 14670 . 2 225 . 2
14720 . 2 . 69 14724 . 5 225 . 3
14783 . 4 . 52 14804 . 2 225 . 3
14830 . 2 . 86 14830 . 3 225 . 3
10280.11 S
10321.09 S
10361.52 S
10401.42 S
10431.11 S
10351.74 W
10404.39 W
10455.86 W
10505.35 W
10541.86 W
Final Station Closure: Distance: 14830.34 ft Az: 225.30 deg.
4. QUALITY CONTROL
QUALITY CONTROL REPORT
JOB NUMBER: A0797GCE411
TOOL NUMBER: 778
MAXIMUM GYRO TEMPERATURE:
81.0 C
MAXIMUM AMBIENT TEMPERATURE: 80.0 C
MAXIMUM INCLINATION: 80.85
AVERAGE AZIMUTH: 225.38
WIRELINE REZERO VALUE: N/A
REZERO ERROR / K: N/A
CALIBRATION USED FOR FIELD SURVEY: 2037
CALIBRATION USED FOR FINAL SURVEY: 2037
PRE JOB MASS BALANCE OFFSET CHECK: -.32
POST JOb MASS BALANCE OFFSET CHECK]:
USED O.O/N/A CONTINUOUS
CONDITION OF SHOCK WATCHES
-.35
UPON ARRIVAL AT RIG: O.K.
UPON COMPLETION OF SURVEY: O.K.
UPON RETURN TO ATLAS O.K.
BOTTOM LINE COMPARISIONS
M.D. INC AZIMUTH TVD NORTHING EASTING
MWD 18125 30.99 230.87 6962 - 10493 -10515
FINAL SURVEY 18100 31.43 230.7 6926 - 10431 -10541
FUNCTION TEST
JOB NUMBER: A0797GCE411
5 Survey stations were collected at the measured depth shown below. The tables show the repeatability
of the gyro tool in both inclination and azimuth at one measured depth.
INCLINATION
M.D. ft 1 2 3 4 5
18147 30.9 30.9 30.9 30.9 30.9
AZIMUTH
M.D. ft I 2 3 4 5
18147 229.81 230.07 229.91 229.97 229.78
5. EQUIPMENT AND CHRONOLOGICAL REPORT
EQUIPMENT REPORT
JOB NUMBER · A0797GCE411
DOWNHOLE ELECTRONICS
SURFACE ELECTRONICS
PRIMARY
TOOL No. 778
GYRO SECTION
DATA SECTION
POWER SECTION
BACKUP
TOOL No. 770
GYRO SECTION
DATA SECTION
POWER SECTION
A0170
C0111
C0112
A0160
C0089
C0086
COMPUTER A0349
POWER SUPPLY
PRINTER A0079
INTERFACE A0143
COMPUTER A0222
POWER SUPPLY
PRINTER A0029
INTERFACE A0055
A0085
A01 O7
WIRELINE COMPANY'
CABLE SIZE · 5/16"
ATLAS
RUNNING GEAR
2.5" HOUSING W/ROLLERS IN COMBO W/SBT
TOTAL LENGTH OF TOOL '80'
MAXIMUM O.D. ' 5.5 INCHES
TOTAL WEIGHT OF TOOL · 1400 POUNDS
CHRONOLOGICAL REPORT
JOB NUMBER: A0797GCE411
WEDNESDAY,07/02/97
01:00 FINISH POOL 7
14:00 CHECK TOOL, O.K., JOB TOMORROW P.M.
THURSDAY,07/03/97
11:00
12:00
14:00
14:45
15:00
18:00
21:00
22:00
23:15
TO LOCATION
ARRIVE LOCATION
MU TOOL, RU ATLAS
PU GYRO. MU LUBRICATOR.
START INRUN SURVEY
SURVEY CONTINUOUS TO 18100'
RUN SBT, GR TO 9700'
1NRUN CONTINUOUS TO 18100'
OUTRUN CONTINUOUS TO 2000'
FRIDAY, 7/04/97
02:00
02:45
04:00
10:30
14:30
16:00
LD TOOL
RIG DOWN
RTN TO ATLAS
PROCESS SURVEY/CHECK TOOL
SEND RESULTS TO RIG W/CO. REP
STANDBY FOR JOB AT ENDICOTT.
ORIGINAL
B.P. EXPLORATION
L PAD, WELL NO. MPL-341
MILNE POINT FIELD, ALASKA
Gyro Multishot Survey Inside 5"DRILL PIPE
Survey date: 16 - MAY, 1997
Job number :A0597GCE400
CONTENTS
JOB NUMBER :A0597GCE400
1. DISCUSSION, SURVEY CERTIFICATION SHEET
2. SURVEY DETAILS
3. OUTRUN SURVEY LISTING
4. QUALITY CONTROL
5. EQUIPMENT AND CHRONOLOGICAL REPORT
1. DISCUSSION; SURVEY CERTIFICATION SHEET
DISCUSSION
JOB NUMBER' A0597GCE400
Tool 768 was run in WELL# MPL-341 on SCHLUMBERGER 3/8" wireline inside DRILL PIPE.
The survey was run without problems.
SURVEY CERTIFICATION SHEET
JOB NUMBER: A0597GCE400
The data for this survey and the calculations for this survey were obtained and performed by me
according to standards and procedures as set forth by Gyrodata Limited, true and correct to the best of
my knowledge.
TOM STODDARD
OPERATIONS ENGINEER
The data and calculations for this survey have been checked by me and conform to the standards and
procedures as set forth by Gyrodata Limited.
This report represents a directional survey of this well based on the original data obtained at the
wellsite.
Checked by :-
ROB SHOUP
OPERATIONS MANAGER
2. SURVEY DETAILS
SURVEY DETAILS
JOB NUMBER: A0597GCE400
CLIENT: B.P. EXPLORATION
RIG:
SCHLUMBERGER
LOCATION: L PAD, ALASKA
WELL: MPL-341
LATITUDE: 70.497 N
LONGITUDE: 149.5 W
SURVEY DATE:
SURVEY TYPE :
16, MAY, 1997
GYRO MULTISHOT IN 5" DRILL PIPE
DEPTH REFERENCE:
52.88'
MAX. SURVEY DEPTH:
ROTARY TABLE ELEVATION
10770'
SURVEY TIED ONTO: NA
SURVEY INTERVAL:
0-10770'
APl NUMBER: 050-029-22766
TARGET DIRECTION: 225.05
GRID CORRECTION: N/A
CALCULATION METHOD: MINIMUM CURVATURE
SURVEYOR: TOM STODDARD
3. OUTRUN SURVEY LISTING
A Gyroda t a Di r e c t i ona i Survey
for
B.P. EXPLORATION
L PAD, WELL NO. MPL-34I
MILNE POINT FIELD, ALASKA
Job Number: A0597GCE400
Run Date: 16-May-97 16:45:00
Surveyor: TOM STODDARD
Calculation Method: MINIMUM CURVATURE
Survey Latitude: 70.497000 deg. N
Sub-sea Correction from Vertical Reference: 52.88 ft.
Azimuth Correction:
Gyro: Bearings are Relative to True North
Proposed Well Direction: 225.050 deg
Vertical Section Calculated from Well Head Location
Closure Calculated from Well Head Location
Horizontal Coordinates Calculated from Local Horizontal Reference
A Gyr oda t a D i r e c t i ona i Survey
B.P. EXPLORATION
L PAD, WELL NO. MPL-34I
MILNE POINT FIELD, ALASKA
Job Number: A0597GCE400
Page
MEASURED I N C L AZIMUTH VERTICAL
DEPTH DEPTH
feet deg. deg. feet
VERTICAL DOGLEG CLOSURE
SECTION SEVERITY DIST. AZIMUTH
feet deg./ feet deg.
100 ft.
HORIZONTAL
COORDINATES
feet
0.0 0.00 0.00 0.0
70.0 .11 230.89 70.0
170.0 .10 296.70 170.0
270.0 .08 305.21 270.0
370.0 .19 316.95 370.0
0.0 0.00 0.0 0.0
.1 .16 .1 230.9
.2 .12 .2 252.8
.2 .02 .3 272.8
.2 .11 .5 289.2
0.00 N 0.00 E
.04 S .05 W
.06 S .21 W
.02 N .34 W
.18 N .51 W
471.0 .23 316.73 471.0
570.0 .29 314.10 570.0
670.0 .48 320.88 670.0
770.0 .50 320.71 770.0
870.0 .55 290.21 870.0
.2 .03 .9 300.3
.2 .07 1.3 305.3
.2 .19 2.0 309.7
.1 .03 2.8 313.0
.3 .28 3.7 311.0
.45 N .76 W
.76 N 1.08 W
1.26 N 1.52 W
1.92 N 2.06 W
2.43 N 2.79 W
970.0 1.36 243.84 970.0
1070.0 2.42 229.73 1069.9
1170.0 3.32 223.29 1169.8
1270.0 4.82 224.26 1269.5
1370.0 7.29 222.17 1369.0
1470.0 8.26 223.18 1468.1
1570.0 9.56 223.17 1566.8
1670.0 11.23 223.04 1665.2
1770.0 11.76 224.05 1763.2
1870.0 12.69 226.71 1860.9
1.6
4.8
9.8
16.9
27.4
40.9
56.4
74.5
94.4
115.5
1.05 4.8 295.7
1.15 7.0 271.5
.95 11.1 252.7
1.50 17.6 241.5
2.48 27.8 234.6
.98 41.1 230.7
1.30 56.5 228.7
1.67 74.5 227.3
.57 94.4 226.5
1.09 115.6 226.3
2.07 N 4.30 W
.19 N 6.97 W
3.28 S 10.57 W
8.40 S 15.48 W
16.11 S 22.68 W
26.05 S 31.85 W
37.35 S 42.45 W
50.52 S 54.77 W
64.96 S 68.50 W
79.81 S 83.58 W
1920.0 14.33 227.97 1909.5
1970.0 16.56 228.80 1957.7
2020.0 18.07 228.96 2005.5
2070.0 19.81 229.08 2052.8
2120.0 21.28 228.50 2099.6
127.2
140.5
155.4
171.5
189.0
3.34 127.2 226.4
4.48 140.6 226.6
3.01 155.4 226.8
3.49 171.6 227.0
2.97 189.2 227.2
87.72 S 92.18 W
96.56 S 102.14 W
106.34 S 113.35 W
116.98 S 125.60 W
128.55 S 138.80 W
A Gyr oda t a D i r ec t i ona i Survey
B.P. EXPLORATION
L PAD, WELL NO. MPL-34I
MILNE POINT FIELD, ALASKA
Job Number: A0597GCE400
Page
MEASURED
DEPTH
feet
I N C L AZIMUTH VERTICAL
DEPTH
deg. deg. feet
VERTICAL DOGLEG CLOSURE
SECTION SEVERITY DIST. AZIMUTH
feet deg./ feet deg.
100 ft.
HORIZONTAL
COORDINATES
feet
2170
2220
2270
2320
2370
.0 23.02 228.13 2145.9
.0 24.35 227.74 2191.7
.0 25.70 228.00 2237.0
.0 27.25 228.00 2281.7
.0 27.80 228.15 2326.1
207.9 3.50 208.0 227.3
227.9 2.68 228.1 227.4
249.1 2.70 249.3 227.4
271.3 3.11 271.5 227.4
294.4 1.10 294.7 227.5
141.09 S 152.88 W
154.54 S 167.79 W
168.73 S 183.47 W
183.65 S 200.03 W
199.08 S 217.23 W
2420
2470
2520
2570
2620
.0
.0
.0
.0
.0
29.74 228.25 2369.9
30.75 228.55 2413.1
32.44 229.09 2455.7
33.41 229.36 2497.6
34.51 229.17 2539.1
318.4 3.89 318.7 227.5
343.6 2.05 343.9 227.6
369.7 3.42 370.1 227.7
396.8 1.96 397.3 227.8
424.6 2.21 425.2 227.9
215.12 S 235.16 W
231.84 S 254.00 W
249.08 S 273.72 W
266.83 S 294.30 W
285.06 S 315.46 W
2670
2720
2770
2820
2870
.0
.0
.0
.0
.0
35.57 229.51 2580.1
37.18 229.20 2620.3
38.52 229.19 2659.8
40.78 229.72 2698.3
42.05 230.01 2735.8
453.3 2.15 453.9 228.0
482.8 3.24 483.5 228.1
513.4 2.70 514.2 228.1
545.2 4.56 546.1 228.2
578.2 2.56 579.1 228.3
303.76 S 337.23 W
323.07 S 359.73 W
343.12 S 382.95 W
363.86 S 407.20 W
385.18 S 432.48 W
2920
2970
3020
3070
3120
.0
.0
.0
.0
.0
44.34 229.98 2772.2
45.76 229.83 2807.6
47.00 229.61 2842.1
49.37 229.26 2875.4
50.30 228.97 2907.6
612.3 4.58 613.3 228.4
647.6 2.86 648.7 228.5
683.6 2.50 684.9 228.6
720.8 4.77 722.2 228.6
758.9 1.91 760.4 228.6
407.17 S 458.69 W
429.96 S 485.76 W
453.37 S 513.38 W
477.60 S 541.69 W
502.61 S 570.58 W
3170.0
3220.0
3270.0
3320.0
3370.0
52.43 228.05 2938.8
53.66 227.70 2968.9
55.24 227.50 2998.0
56.79 227.12 3025.9
58.76 226.45 3052.6
797.9 4.48 799.4 228.6
837.8 2.52 839.4 228.6
878.4 3.18 880.1 228.5
919.8 3.16 921.5 228.5
962.1 4.11 963.8 228.4
528.48 S 599.83 W
555.28 S 629.46 W
582.71 S 659.50 W
610.82 S 689.97 W
639.79 S 720.79 W
A Gyroda t a Di r e c t i ona i Survey
B.P. EXPLORATION
L PAD, WELL NO. MPL-34I
MILNE POINT FIELD, ALASKA
Job Number: A0597GCE400
Page
MEASURED
DEPTH
feet
I N C L AZIMUTH VERTICAL
DEPTH
deg. deg. feet
VERTICAL
SECTION
feet
DOGLEG CLOSURE
SEVERITY DIST. AZIMUTH
deg./ feet deg.
100 ft.
HORIZONTAL
COORDINATES
feet
3420.0
3470.0
3520.0
3570.0
3620.0
59.84 226.25 3078.1
61.71 226.13 3102.5
62.39 225.73 3126.0
64.00 225.21 3148.5
64.88 225.19 3170.1
1005.1
1048.7
1092.9
1137.5
1182.6
2.18 1006.7 228.3
3.74 1050.3 228.2
1.54 1094.5 228.1
3.34 1139.1 228.0
1.78 1184.1 227.9
669.46 S 751.90 W
699.67 S 783.39 W
730.38 S 815.12 W
761.68 S 846.94 W
793.46 S 878.94 W
3670.0
3720.0
3770.0
3820.0
3870.0
66.36 224.95 3190.7
67.63 224.94 3210.3
69.04 224.23 3228.7
70.62 224.47 3246.0
71.37 224.14 3262.2
1228
1274
1320
1367
1414
.2
.2
.7
.6
.8
2.99 1229.6 227.8
2.53 1275.6 227.7
3.13 1322.0 227.6
3.18 1368.8 227.5
1.63 1416.0 227.4
825.63 S 911.18 W
858.20 S 943.70 W
891.29 S 976.32 W
924.85 S 1009.13 W
958.68 S 1042.14 W
3920.0
3970.0
4020.0
4070.0
4120.0
4170.0
4220.0
4270.0
4320.0
4370.0
73.55 223.75 3277.3
74.18 223.47 3291.2
76.18 223.02 3304.0
77.11 222.97 3315.5
79.49 222.40 3325.7
79.63 222.38 3334.7
79.76 222.49 3343.7
79.46 222.49 3352.7
80.40 222.45 3361.4
80.51 222.48 3369.7
1462
1510
1558
1607
1656
1705
1754
1803
1852
1902
.5
.5
.8
.5
.4
.5
.6
.8
.9
.2
4.43 1463.6 227.3
1.37 1511.6 227.2
4.08 1559.8 227.0
1.87 1608.3 226.9
4.88 1657.1 226.8
.30 1706.2 226.7
.33 1755.2 226.5
.60 1804.3 226.4
1.89 1853.4 226.3
.23 1902.6 226.2
993.01 S
1027.79 S
1062.99 S
1098.57 S
1134.56 S
1170.88 S
1207.19 S
1243.45 S
1279.77 S
1316.14 S
1075.23 W
1108.35 W
1141.47 W
1174.65 W
1207.84 W
1240.99 W
1274.18 W
1307.40 W
1340.64 W
1373.93 W
4420.0
4470.0
4520.0
4570.0
4620.0
80.85 222.56 3377.8
80.48 222.58 3385.9
79.47 222.66 3394.6
79.14 222.78 3403.9
77.64 222.92 3414.0
1951.5
2000.8
2050.0
2099.1
2148.0
.69 1951.8 226.1
.74 2001.1 226.0
2.02 2050.2 226.0
.70 2099.3 225.9
3.01 2148.2 225.8
1352.51 S
1388.84 S
1425.07 S
1461.17 S
1497.07 S
1407.27 W
1440.65 W
1473.99 W
1507.32 W
1540.63 W
A Gyr oda t a Di r e c t i ona i Survey
B.P. EXPLORATION
L PAD, WELL NO. MPL-34I
MILNE POINT FIELD, ALASKA
Job Number: A0597GCE400
Page
MEASURED
DEPTH
feet
I N C L AZIMUTH VERTICAL
DEPTH
deg. deg. feet
VERTICAL DOGLEG CLOSURE
SECTION SEVERITY DIST. AZIMUTH
feet deg./ feet deg.
100 ft.
HORIZONTAL
COORDINATES
feet
4670.0
4720.0
4770.0
4820.0
4870.0
77 45 222.82 3424.8
77.87 222.71 3435.5
77.51 222.72 3446.1
77.86 222.96 3456.8
77.59 223.03 3467.4
2196.8 .42 2197.0 225.8
2245.6 .86 2245.7 225.7
2294.4 .72 2294.5 225.6
2343.2 .83 2343.3 225.6
2392.0 .55 2392.1 225.5
1532.86 S 1573.84 W
1568.72 S 1607.01 W
1604.61 S 1640.15 W
1640.43 S 1673.36 W
1676.17 S 1706.68 W
4920.0
4970.0
5020.0
5070.0
5120.0
78.02 223.49 3478.0
79.18 224.02 3487.8
79.45 224.17 3497.1
80.20 224.13 3506.0
80.32 224.19 3514.4
2440.9 1.25 2441.0 225.5
2489.9 2.53 2490.0 225.4
2539.0 .62 2539.1 225.4
2588.2 1.49 2588.3 225.4
2637.5 .28 2637.5 225.4
1711.76 S
1747.16 S
1782.45 S
1817.76 S
1853.11 S
1740.17 W
1774.07 W
1808.25 W
1842.53 W
1876.87 W
5170.0
5220.0
5270.0
5320.0
5370.0
5420.0
5470.0
5520.0
5570.0
5620.0
80.27 224.44 3522.8
80.40 224.31 3531.2
80.39 224.32 3539.6
80 . 54 224 . 31 3547 . 9
79.25 224.20 3556.6
79.04 224.19 3566.0
78.96 224.44 3575.6
77.74 224.50 3585.7
77.12 224.67 3596.6
77.15 225.08 3607.7
2686.8 .49 2686.8 225.3
2736.1 .36 2736.1 225.3
2785.4 .03 2785.4 225.3
2834.7 .29 2834.7 225.3
2883.9 2.58 2883.9 225.3
2933.0 .42 2933.0 225.3
2982.1 .52 2982.1 225.2
3031.0 2.44 3031.0 225.2
3079.8 1.28 3079.8 225.2
3128.6 .81 3128.6 225.2
1888.37 S
1923.60 S
1958.88 S
1994.16 S
2029.41 S
2064.62 S
2099.74 S
2134.68 S
2169.44 S
2203.99 S
1911.30 W
1945.77 W
1980.21 W
2014.66 W
2049.01 W
2083.24 W
2117.53 W
2151.83 W
2186.09 W
2220.48 W
5670.0 76.50 225.24 3619.1
5720.0 76.52 225.43 3630.8
5770.0 76.27 225.58 3642.5
5820.0 77.05 225.83 3654.1
5870.0 77.49 225.99 3665.1
3177.3 1.33 3177.3 225.2
3225.9 .39 3225.9 225.2
3274 . 5 . 58 3274 . 5 225 . 2
3323.1 1.64 3323.1 225.2
3371.9 .92 3371.9 225.2
2238.32 S
2272.50 S
2306.55 S
2340.53 S
2374.46 S
2255.00 W
2289.58 W
2324.24 W
2359.07 W
2394.10 W
A Gyroda t a D i re c t i ona i Survey
B.P. EXPLORATION
L PAD, WELL NO. MPL-34I
MILNE POINT FIELD, ALASKA
Job Number: A0597GCE400
Page
MEASURED I N C L AZIMUTH VERTICAL
DEPTH DEPTH
feet deg. deg. feet
VERTICAL DOGLEG CLOSURE
SECTION SEVERITY DIST. AZIMUTH
feet deg./ feet deg.
100 ft.
HORIZONTAL
COORDINATES
feet
5920.0 77.31 226.06 3676.0
5970.0 78.04 226.45 3686.6
6020.0 77.45 226.77 3697.3
6070.0 78.57 227.31 3707.6
6120.0 78.57 227.57 3717.6
3420.7 .37 3420.7 225.2
3469.5 1.64 3469.5 225.3
3518.4 1.34 3518.4 225.3
3567.2 2.48 3567.3 225.3
3616.2 .50 3616.2 225.3
2408.34 S 2429.21 W
2442.12 S 2464.50 W
2475.69 S 2500.01 W
2509.01 S 2535.80 W
2542.16 S 2571.90 W
6170.0 79.42 227.86 3727.1
6220.0 80.26 228.32 3735.9
6270.0 80.42 228.56 3744.3
6320.0 80.71 228.83 3752.5
6370.0 80.52 229.12 3760.7
3665.2 1.80 3665.3 225.4
3714.4 1.91 3714.4 225.4
3763.6 .56 3763.7 225.4
3812.8 .79 3812.9 225.5
3862.0 .70 3862.2 225.5
2575.18 S 2608.21 W
2608.06 S 2644.83 W
2640.76 S 2681.71 W
2673.32 S 2718.77 W
2705.70 S 2755.98 W
6420.0 80.33 229.59 3769.0
6470.0 80.88 230.11 3777.1
6520.0 79.82 230.37 3785.5
6570.0 79.92 230.48 3794.3
6620.0 79.72 230.59 3803.1
6670.0 78.75 230.66 3812.5
6720.0 78.74 230.67 3822.2
6770.0 78.48 230.44 3832.1
6820.0 79.70 230.26 3841.6
6870.0 80.09 230.16 3850.4
3911.2 1.00 3911.3 225.6
3960.3 1.51 3960.5 225.6
4009.4 2.18 4009.7 225.7
4058.4 .30 4058.7 225.7
4107.4 .45 4107.8 225.8
4156.3 1.96 4156.7 225.9
4205.1 .04 4205.6 225.9
4253.9 .68 4254.4 226.0
4302.8 2.45 4303.4 226.0
4351.8 .82 4352.5 226.1
2737.81 S 2793.39 W
2769.61 S 2831.10 W
2801.14 S 2868.99 W
2832.50 S 2906.93 W
2863.78 S 2944.92 W
2894.94 S 2982.89 W
2926.02 S 3020.82 W
2957.16 S 3058.67 W
2988.49 S 3096.48 W
3019.99 S 3134.30 W
6920.0 79.63 230.13 3859.2
6970.0 79.87 230.04 3868.1
7020.0 79.67 230.03 3876.9
7070.0 79.79 230.16 3885.9
7120.0 79.48 230.38 3894.9
4400.8 .93 4401.6 226.1
4449.8 .52 4450.7 226.2
4498.9 .41 4499.8 226.2
4547.9 .34 4548.9 226.2
4596.9 .75 4597.9 226.3
3051.53 S 3172.08 W
3083.10 S 3209.82 W
3114.71 S 3247.54 W
3146.27 S 3285.28 W
3177.71 S 3323.10 W
A Gyro da t a Di r e c t i ona i Survey
B.P. EXPLORATION
L PAD, WELL NO. MPL-34I
MILNE POINT FIELD, ALASKA
Job Number: A0597GCE400
Page
MEASURED I N C L AZIMUTH VERTICAL
DEPTH DEPTH
feet deg. deg. feet
VERTICAL DOGLEG CLOSURE
SECTION SEVERITY DIST. AZIMUTH
feet deg./ feet deg.
100 ft.
HORIZONTAL
COORDINATE
feet
7170.0 78.28 230.48 3904.5
7220.0 78.48 230.47 3914.6
7270.0 77.71 230.51 3924.9
7320.0 78.22 230.58 3935.3
7370.0 77.15 229.88 3946.0
4645 . 7 2 . 41 4646 . 8 226 . 3
4694.5 .39 4695.7 226.4
4743 . 2 1 . 55 4744 . 5 226 . 4
4791.8 1.03 4793.3 226.5
4840 . 5 2 . 53 4842 . 0 226 . 5
3208.96 S 3360.92 W
3240.13 S 3398.70 W
3271.25 S 3436.44 W
3302.32 S 3474.20 W
3333.57 S 3511.75 W
7420.0 76.50 228.85 3957.4
7470.0 76.65 228.10 3969.0
7520.0 76.30 227.43 3980.7
7570.0 76.74 226.96 3992.3
7620.0 76.77 226.20 4003.8
4889.0 2.38 4890.6 226.5
4937.6 1.51 4939.2 226.5
4986.1 1.47 4987.8 226.6
5034.7 1.27 5036.5 226.6
5083.4 1.49 5085.1 226.6
3365.27 S
3397.51 S
3430.19 S
3463.23 S
3496.68 S
3548.70 W
3585.11 W
3621.10 W
3656.77 W
3692.12 W
7670.0 76.85 225.94 4015.2
7720.0 77.42 225.58 4026.3
7770.0 76.98 225.72 4037.4
7820.0 78.55 225.80 4048.0
7870.0 77.18 225.69 4058.5
7920.0 76.94 225.48 4069.7
7970.0 77.33 224.97 4080.9
8020.0 77.57 224.65 4091.7
8070.0 78.74 224.59 4102.0
8120.0 78.60 224.61 4111.8
5132.0 .52 5133.8 226.6
5180.8 1.34 5182.5 226.5
5229.5 .93 5231.3 226.5
5278.4 3.15 5280.2 226.5
5327.3 2.74 5329.0 226.5
5376.0 .64 5377.8 226.5
5424.7 1.27 5426.5 226.5
5473.6 .78 5475.3 226.5
5522.5 2.35 5524.2 226.5
5571.5 .28 5573.2 226.5
3530.46 S
3564.46 S
3598.55 S
3632.64 S
3666.75 S
3700.85 S
3735.18 S
3769.81 S
3804.64 S
3839.54 S
3727.18 W
3762.10 W
3796.96 W
3831.97 W
3866.98 W
3901.79 W
3936.40 W
3970.79 W
4005.16 W
4039.59 W
8170.0 78.75 224.59 4121.6
8220.0 78.44 224.49 4131.5
8270.0 78.13 224.56 4141.7
8320.0 78.37 224.46 4151.8
8370.0 77.66 224.28 4162.2
5620.5 .30 5622.2 226.4
5669.5 .65 5671.2 226.4
5718.5 .64 5720.1 226.4
5767.4 .52 5769.0 226.4
5816.4 1.45 5817.9 226.4
3874.45 S
3909.38 S
3944.29 S
3979.19 S
4014.16 S
4074.01 W
4108.39 W
4142.72 W
4177.04 W
4211.24 W
A Gyr oda t a D i r e c t i ona i Survey
B.P. EXPLORATION
L PAD, WELL NO. MPL-34I
MILNE POINT FIELD, ALASKA
Job Number: A0597GCE400
Page
MEASURED I N C L AZIMUTH VERTICAL
DEPTH DEPTH
feet deg. deg. feet
8420.0 78.09 224.06 4172.7
8470.0 78.39 223.71 4182.9
8520.0 78.15 223.63 4193.1
8570.0 78.19 223.54 4203.3
8620.0 77.46 223.50 4213.9
VERTICAL
SECTION
feet
5865.2
5914.2
5963.1
6012.0
6060.9
DOGLEG CLOSURE
SEVERITY DIST. AZIMUTH
deg./ feet deg.
100 ft.
.95 5866.8 226.4
.92 5915.7 226.3
.49 5964.6 226.3
.19 6013.4 226.3
.46 6062.3 226.3
HORIZONTAL
COORDINATES
feet
4049.22 S 4245.30 W
4084.50 S 4279.23 W
4119.91 S 4313.04 W
4155.36 S 4346.78 W
4190.80 S 4380.43 W
8670.0 77.88 223.29 4224.6
8720.0 78.13 223.36 4235.0
8770.0 78.39 223.26 4245.1
8820.0 78.05 223.12 4255.3
8870.0 78.01 222.93 4265.7
6109.7
6158.6
6207.5
6256.5
6305.3
.92 6111.0 226.2
.52 6159.9 226.2
.56 6208.8 226.2
.74 6257.7 226.2
.38 6306.5 226.2
4226.30 S 4413.99 W
4261.88 S 4447.55 W
4297.50 S 4481.13 W
4333.18 S 4514.63 W
4368.94 S 4548.00 W
8920.0 79.26 222.71 4275.6
8970.0 79.53 222.64 4284.8
9020.0 79.56 222.60 4293.9
9070.0 79.05 222.40 4303.1
9120.0 78.54 222.22 4312.8
9170.0 78.63 222.25 4322.7
9220.0 78.90 222.48 4332.5
9270.0 79.22 222.31 4342.0
9320.0 78.62 222.05 4351.6
9370.0 78.99 222.02 4361.3
6354.3
6403.4
6452.5
6501.6
6550.6
6599.6
6648.6
6697.6
6746.6
6795.6
2.54 6355.4 226.1
.56 6404.5 226.1
.12 6453.6 226.1
1.11 6502.6 226.0
1.07 6551.6 226.0
.19 6600.5 226.0
.70 6649.4 226.0
.70 6698.4 225.9
1.31 6747.4 225.9
.76 6796.3 225.9
4404.89 S 4581.32 W
4441.02 S 4614.64 W
4477.20 S 4647.93 W
4513.43 S 4681.12 W
4549.70 S 4714.14 W
4585.99 S 4747.08 W
4622.22 S 4780.13 W
4658.48 S 4813.23 W
4694.84 S 4846.18 W
4731.26 S 4879.02 W
9420.0 80.00 222.48 4370.4
9470.0 79.68 222.48 4379.2
9520.0 80.09 222.17 4388.0
9570.0 79.98 222.84 4396.7
9620.0 80.13 223.62 4405.3
6844.7
6893.9
6943.0
6992.2
7041.4
2.20 6845.4 225.9
.64 6894.5 225.8
1.03 6943.6 225.8
1.35 6992.8 225.8
1.55 7042.0 225.8
4767.66 S 4912.08 W
4803.96 S 4945.31 W
4840.35 S 4978.45 W
4876.65 S 5011.73 W
4912.54 S 5045.46 W
A Gyr oda t a D i r e c t i ona i Survey
B.P. EXPLORATION
L PAD, WELL NO. MPL-34I
MILNE POINT FIELD, ALASKA
Job Number: A0597GCE400
Page
MEASURED I N C L AZIMUTH VERTICAL
DEPTH DEPTH
feet deg. deg. feet
VERTICAL DOGLEG CLOSURE
SECTION SEVERITY DIST. AZIMUTH
feet deg./ feet deg.
100 ft.
HORIZONTAL
COORDINATES
feet
9670.0 80.18 224.23 4413.8
9720.0 79.76 224.68 4422.6
9770.0 79.78 224.67 4431.4
9820.0 79.76 224.08 4440.3
9870.0 80.13 223.58 4449.0
7090.7 1.21 7091.2 225.8
7139.9 1.22 7140.5 225.7
7189.1 .05 7189.6 225.7
7238.3 1.16 7238.8 225.7
7287.6 1.24 7288.0 225.7
4948.02 S 5079.63 W
4983.16 S 5114.11 W
5018.15 S 5148.71 W
5053.33 S 5183.12 W
5088.84 S 5217.21 W
9920.0 79.75 223.19 4457.8
9970.0 80.15 222.88 4466.5
10020.0 80.13 222.69 4475.1
10070.0 79.80 222.39 4483.8
10120.0 80.28 222.17 4492.4
7336.8 1.08 7337.2 225.7
7386.0 1.01 7386.4 225.7
7435.2 .37 7435.6 225.7
7484.4 .90 7484.8 225.6
7533.6 1.06 7533.9 225.6
5124.63 S 5251.02 W
5160.61 S 5284.62 W
5196.76 S 5318.08 W
5233.04 S 5351.37 W
5269.48 S 5384.50 W
10170.0 80.01 221.94 4501.0
10220.0 80.61 221.64 4509.4
10270~0 80.43 221.41 4517.6
10320.0 80.55 221.25 4525.9
10370.0 80.78 221.22 4534.0
7582.8 .69 7583.1 225.6
7632.0 1.32 7632.3 225.6
7681.2 .57 7681.5 225.5
7730.4 .40 7730.7 225.5
7779.6 .48 7779.9 225.5
5306.06 S
5342.80 S
5379.72 S
5416.75 S
5453.85 S
5417.50 W
5450.34 W
5483.04 W
5515.61 W
5548.13 W
10420.0 80.22 222.82 4542.3
10470.0 80.90 222.80 4550.5
10520.0 80.72 222.36 4558.4
10570.0 80.24 222.38 4566.7
10620.0 79.29 223.20 4575.6
7828.9 3.35 7829.1 225.5
7878.2 1.35 7878.4 225.5
7927.5 .94 7927.6 225.4
7976.7 .96 7976.9 225.4
8025.9 2.49 8026.0 225.4
5490.49 S
5526.67 S
5563.01 S
5599.45 S
5635.56 S
5581.14 W
5614.66 W
5648.05 W
5681.28 W
5714.70 W
10670 . 0 79 . 11 223 . 63 4585 . 0
10720 . 0 78 . 59 224 . 77 4594 . 6
10770.0 78.80 225.47 4604.4
8075.0 .93 8075.1 225.4
8124.0 2.46 8124.2 225.4
8173.1 1.42 8173.2 225.4
5671.23 S
5706.40 S
5741.00 S
5748.46 W
5782.66 W
5817.40 W
Final Station Closure: Distance: 8173.20 ft Az: 225.38 deg.
A Gyroda t a D i re c t i ona i Survey
for
B.P. EXPLORATION
L PAD, WELL NO. MPL-34I
MILNE POINT FIELD, ALASKA
Job Number: SUB400
Run Date: 16-May-97 16:45:00
Surveyor: TOM STODDARD
Calculation Method: MINIMUM CURVATURE
Survey Latitude: 70.497000 deg. N
Sub-sea Correction from Vertical Reference: 52.88 ft.
Azimuth Correction:
Gyro: Bearings are Relative to True North
Proposed Well Direction: 225.050 deg
Vertical Section Calculated from Well Head Location
Closure Calculated from Well Head Location
Horizontal Coordinates Calculated from Local Horizontal Reference
A Gyrodat
B.P. EXPLORATION
L PAD, WELL NO. MPL-34I
MILNE POINT FIELD, ALASKA
Job Number: SUB400
SUBSEA
DEPTH
feet
I N C L AZIMUTH VERTICAL
DEPTH
deg. deg. feet
VERTICAL
SECTION
feet
-52
100
200
300
400
.9
.0
.0
.0
.0
500.0
600.0
700.0
800.0
900.0
1000.0
1100.0
1200.0
1300.0
1400.0
1500.0
1600.0
1700.0
1800.0
1900.0
2000.0
2100.0
2200.0
2300.0
2400.0
0.~00 0.00 0.0
.10 285.43 152.9
.08 303.75 252.9
.17 314.94 352.9
.22 316.77 452.9
.28 314.56 552.9
.44 319.72 652.9
.50 320.74 752.9
.54 295.43 852.9
1.22 251.77 952.9
2.24 232.14 1052.9
3.17 224.38 1152.9
4.57 224.10 1252.9
6.89 222.51 1352.9
8.11 223.03 1452.9
9.37 223.17 1552.9
11.02 223.06 1652.9
11.70 223.94 1752.9
12.61 226.49 1852.9
16.34 228.72 1952.9
19.81 229.08 2052.9
23.23 228.07 2152.9
26.25 228.00 2252.9
28.98 228.21 2352.9
32.33 229.06 2452.9
0.0
.2
.2
.2
.2
.2
.2
.1
.2
1.4
4.3
9.0
15.7
25.7
38.9
54.2
72.2
92.3
113.8
139.2
171.6
210.9
257.0
309.1
368.0
a D i r e c t i ona i Survey
DOGLEG CLOSURE
SEVERITY DIST. AZIMUTH
deg./ feet deg.
100 ft.
0.00 0.0 0.0
.12 .2 249.1
· 04 .3 269.4
.10 .5 286.4
.05 .9 298.3
.06 1.3 304.4
.17 2.0 308.9
.06 2.8 312.4
.24 3.7 311.4
.92 4.8 298.3
1.14 7.0 275.7
.99 11.1 255.9
1.41 17.6 243.4
2.32 27.8 235.7
1.21 41.1 231.3
1.25 56.5 228.9
1.63 74.5 227.5
.68 94.4 226.6
1.04 115.6 226.3
4.37 140.6 226.6
3.49 189.2 227.0
3.37 228.1 227.3
2.84 271.5 227.4
2.80 318.7 227.5
3.33 370.1 227.7
Page
HORIZONTAL
COORDINATES
feet
0.00 N 0.00 E
.06 S .18 W
.02 N .32 W
.15 N .48 W
.40 N .72 W
.71 N 1.02 W
1.17 N 1.44 W
1.81 N 1.97 W
2.34 N 2.66 W
2.13 N 4.04 W
.51 N 6.52 W
2.76 S 9.96 W
7.54 S 14.66 W
14.86 S 21.51 W
24.53 S 30.45 W
35.75 S 40.95 W
48.87 S 53.23 W
63.44 S 67.06 W
78.59 S 82.34 W
95.67 S 101.14 W
117.02 S 125.63 W
143.14 S 155.15 W
174.03 S 189.36 W
208.89 S 228.20 W
247.95 S 272.42 W
A Gyroda t a D i re c t i ona i Survey
B.P. EXPLORATION
L PAD, WELL NO. MPL-34I
MILNE POINT FIELD, ALASKA
Job Number: SUB400
Page
SUBSEA
DEPTH
feet
I N C L AZIMUTH VERTICAL
DEPTH
deg. deg. feet
VERTICAL DOGLEG CLOSURE
SECTION SEVERITY DIST. AZIMUTH
feet deg./ feet deg.
100 ft.
HORIZONTAL
COORDINATES
feet
2500.0 34.'86 229.28 2552.9
2600.0 38.29 229.19 2652.9
2700.0 43.12 230.00 2752.9
2800.0 47.77 229.50 2852.9
2900.0 53.00 227.89 2952.9
434.3 2.19 453.9 227.9
508.1 2.79 514.2 228.1
594.2 3.51 613.3 228.4
695.7 3.24 722.2 228.6
816.5 3.57 839.4 228.6
291.34 S 322.78 W
339.61 S 378.88 W
395.49 S 444.77 W
461.24 S 522.57 W
540.99 S 613.66 W
3000.0 58.77 226.44 3052.9
3100.0 64.18 225.21 3152.9
3200.0 70.94 224.33 3252.9
3300.0 79.48 222.49 3352.9
3400.0 77.73 222.87 3452.9
962.6 4.09 1006.7 228.4
1146.6 3.03 1184.1 228.0
1387.7 2.52 1416.0 227.4
1804.8 .63 1853.4 226.4
2325.4 .79 2343.3 225.6
640.12 S
768.11 S
939.22 S
1244.20 S
1627.33 S
721.14 W
853.41 W
1023.15 W
1308.08 W
1661.22 W
3500.0 79.80 224.24 3552.9
3600.0 76.97 225.80 3652.9
3700.0 80.70 228.84 3752.9
3800.0 79.96 230.15 3852.9
3900.0 76.76 229.26 3952.9
2862.9 1.60 2883.9 225.3
3318.2 1.54 3323.1 225.2
3815.0 .79 3862.2 225.5
4365.9 .85 4401.6 226.1
4869.9 2.44 4890.6 226.5
2014.36 S
2337.08 S
2674.78 S
3029.03 S
3352.78 S
2034.34 W
2355.53 W
2720.45 W
3145.12 W
3534.14 W
4000.0 77.91 225.75 4052.9
4100.0 78.30 224.44 4152.9
4200.0 78.13 223.16 4252.9
4300.0 78.67 222.05 4352.9
4400.0 79.97 223.41 4452.9
5301.0 2.96 5329.0 226.5
5772.3 .62 5817.9 226.4
6244.7 .70 6257.7 226.2
6753.2 1.23 6796.3 225.9
7309.2 1.17 7337.2 225.7
3648.44 S
3982.67 S
4324.57 S
4699.72 S
5104.55 S
3848.19 W
4180.44 W
4506.54 W
4850.58 W
5232.05 W
4500.0 80.84 222.67 4552.9
4551.6 78.80 225.47 4604.4
7893.1 1.22 7927.6 225.4
8173.1 1.42 8173.2 225.4
5537.69 S
5741.00 S
5624.78 W
5817.40 W
Final Station Closure: Distance: 8173.20 ft Az: 225.38 deg.
4. QUALITY CONTROL
QUALITY CONTROL REPORT
JOB NUMBER: A0597GCE400
TOOL NUMBER: 768
MAXIMUM GYRO TEMPERATURE:
75.0C
MAXIMUM AMBIENT TEMPERATURE: 40.0 C
MAXIMUM INCLINATION: 80.85
AVERAGE AZIMUTH: 225.38
WIRELINE REZERO VALUE: N/A
REZERO ERROR/K: N/A
CALIBRATION USED FOR FIELD SURVEY: 1995
CALIBRATION USED FOR FINAL SURVEY: 1995
PRE JOB MASS BALANCE OFFSET CHECK: -.30
POST JOB MASS BALANCE OFFSET CHECK~:
USED O.O/N/A CONTINUOUS
CONDITION OF SHOCK WATCHES
-.35
UPON ARRIVAL AT RIG: 1 OFF
UPON COMPLETION OF SURVEY:
I OFF
UPON RETURN TO ATLAS I OFF
BOTTOM LINE COMPARISIONS
M.D. INC AZIMUTH TVD NORTHING FASTING
MWD 10783 78.21 226.2 4593.29 -5792 -5787
FINAL SURVEY 10770 78.80 225.47 4604.4 - 5741.0 -5817.4
FUNCTION TEST
JOB NUMBER: A0597GCE400
5 Survey stations were collected at the measured depth shown below. The tables show the
repeatability of the gyro tool in both inclination and azimuth at one measured depth.
INCLINATION
M.D. ff 1 2 3 4 5
1900 12.69 12.69 12.69 12.69 12.69
AZIMUTH
M.D. ft 1 2 3 4 5
1900 226.71 226.67 226.51 226.57 226.48
5. EQUIPMENT AND CHRONOLOGICAL REPORT
EQUIPMENT REPORT
JOB NUMBER: A0597GCE400
DOWNHOLE ELECTRONICS
SURFACE ELECTRONICS
PRIMARY
TOOL No. 768
GYRO SECTION
DATA SECTION
POWER SECTION
BACKUP
TOOL No. 773
GYRO SECTION
DATA SECTION
POWER SECTION
A0159
C0100
C0040
A0163
C0089
C0086
COMPUTER A0349
POWER SUPPLY
PRINTER A0079
INTERFACE A0143
COMPUTER A0222
POWER SUPPLY
PRINTER A0029
INTERFACE A0055
A0085
A0107
WIRELINE COMPANY:
CABLE SIZE: 3/8"
SCHLUMBERGER
RUNNING GEAR
2.25" HOUSING W/ECCENTRIC BAR AND CENTRALZERS
TOTAL LENGTH OF TOOL :35'
MAXIMUM O.D.: 2.25 INCHES
TOTAL WEIGHT OF TOOL: 200 POUNDS
CHRONOLOGICAL REPORT
JOB NUMBER: A0597GCE400
THURSDAY, 05/15/97
11:50 TO SLOPE ON CHARTER
14:00 ARRIVE ATLAS
18:00 CHECK TOOL, O.K., JOB TOMORROW A.M.
FRIDAY, 05/16/97
10:30
12:00
14:00
16:30
16:45
19:00
21:00
21:45
23:00
TO LOCATION
ARRIVE LOCATION
MU TOOL, STANDBY
PU GYRO. MU SIDE ENTRY SUB.
START INRUN SURVEY
SURVEY CONTINUOUS TO 10770'
OUTRUN CONTINUOUS 100FPM
RIG DOWN
RTN TO ATLAS
SATURDAY, 05/17/97
02:30 PROCESS SURVEY/CHECK TOOL/FAX RESULTS TO RIG
10:30 RETURN TO MILNE POINT FIELD WITH RESULTS.
12:00 TO F PAD FOR MPF-05.
,STATE OF At.A~
-. ~ ::~ _,, ,
axm: //"/2- ? ~
_!
; COMMENTS:
TBG. INd. FLeD CODES
FRESH WATER INj.
SALT WATER INJ.
NOT ~NJECTING
c-~
c-
c. Ir~peetor
TEST TYP~
M = ANNULUS MONITORING
P = STD ANNULUS PRESSURE TEST
R = INTERNAL P,/~. TRACER SURVEY
A = TEMPERA~IJRE ANOMALY TEEtF
D = DIFFERENTIAL TEMPERATURE TEST
[Rev a/17h36)
I- KUIq : NHBUK~ ;)5
~."
'N 0£
FROM:
NRBORS 55
Operator BP Exploration
Field Miinc Point
FAX NO.: 659 4189
Morning Completion Report
Well MPL-34
Rig Nabor~ 5S
12-11-97 07:15A P.Ol
~) 7-oB o
Report 8, p:~ge 2
Date 06:00, 14 Nov 97
Drill
Accumulator
Kick (Weld Kilt)
H2S
Fire
Abartdon
Kick While Tripping
Spill
Safety
Date Run LTA Today No
18:00, 31 Oct 97 Days Since Last LTA 35
18:00, 09 Nov 97 Accident/lncjdent Today No
18:00. 10 Nov 97 Days Since Last Acctlnc 19
18:00, 11 Nov 97 Acc/lnc Report Filed No
18:00. 12 Nov 97 Spill No
18:00, 12 Nov 97 Spill Type
18:00, 13 Nov 97 Spill Vol
Last Safety Mtg06:00, 14 Nov 97
Days Since Last Spill 19
Weather
Wind Speed
Visibility
Sea H,Hgh t
Sea Direction
Barometer
Weather State
17.0 m/hr Wind Direction 270.00 des
20.1) mile Temperature 24 degF
Wave Period
Max Current
Chill Fact,Jr - 1 dcgF
LIGHT SNOW
PI
(fL) (fL)
17906.0 18032.0,
Maufacturer
Production
Top'rVD Btm TVD iShot Dens Res Press! Overbal
(fL) (1I) i(shotffIt) (psi) i (psi)
6776,0~, 6877.01, , 3500.0[.., 400.0
Completion
Tree Size
Fill Depth
(fL)
0.0
Comments
ACCEPT RIG (~ 2300 HR$ ! 1-6-97
MPUL34j **4 PJSM
ALLS WELL
06:00-11:00
06:00-07:00
07:00
07:00-07:30
07:30
07:30-11:00
ll:O0
11:00~2~;00
11:00-21:00
21:00
21:00-
21:00-23:00
23:00
23;00-06:00
06:00
Progress Log
BHA run rio. 1
Pulled ou~ of h~le to 10000.0 ft
Tubing handling equipment failed - Change operation
Serviced Tub~mg handling equipment
REPAIR HYD
Equipment work c~l~leted
Pulled out of hole to 9000.0 ft
Tubing handling eClUiDment failed - Change operation
Repair
Repaired Tubing handling equipment
REPAIR SKATE S¥ST
Equipment work completed
BHA run no. 1
Serviced Block line
SLIP CUT 80 FT LINE
Line slipped and cut
Pulled out of hole to 1200.0 ft
SLopped ; To Bold safety meeting
OEAP: Daily Cost Tracking
Facility: M Pi L Pad
Program: MPL-34 RWO
Accaun{ing Code
9900-070-700
9900-070-705
9900-070-710
9900-070-715
990Q-Q70-~20
9900-(}70-725
9900-070-730
99[X)-070-735
9900-070-740
9~0-Q70-7~
9900-070-750
9900-070-755
9900-070-760
9900-070-765
9900-070-770
9900-070-775
9900-070-780
9~0-070-7~
9S00-070-790
9900-070-795
DEAP Calegory
WeJjsite Work
Ri,(] Move
Completion R'.q & Labor
Quarters & Cate~inq
Fuel, Power, and Water
Completior~ Ruids & Serv
Cement Sv.s, Sqz Cmt & Plug
Perfora/ip.q & Other Comp Ser,~
Formation-Stimu iation
Compl Pi .~JB'r~BH~
Han dli n~§ of Compl Tubulars
Production Testing
Wellhead Equip Services
Transportalion
Cased Hole E-Uno Logg!D_q___
Wasle Management - Environ
Installation ot Well Equip
Supervision & Indirects
M[sc. Sidetrack Ol:~eratJons
WO/ST E~ensed Equipment
Daily Cost Data
Well: MPL-34
Type: Produclion
Dairy Cost
USD
Totals
Oate: 14-Nov-97 06:00 No:
A FEN umber: 347076
Cum Cost
USD
~80,00
27000.00
Commenl
8PX STORES
NABOR$ 5-S
16000.00 128000.00 NABORS 5--S
405.00 3240.00
MPU ~BASE CAMP
1000.00 7O(]0.00 B PX
, 72000,00 BAROID
7081.00
3500.00
SCHLUMBERGER
BPX
FMC
PEAK-~.2500./AIR-~'! 000,
SCHLUMBERGER
CC2A
5000.00 I 4C000,00 BPX
45.00
25950,00
360.00
32~061
PEAK $25. TRAILER/G BR TAN K
,~20.
FROM:
NABORS 5S
·
Operator BP Exploration
Field Milnc Point
FAX N0.: 659 4189
. Illll Ill
Morning Completion Report
Well MPL-3a
Rig Nabors 5S
12-1 1-92 07:16R P,05
~! ...
iiii
Report 8, page J
Date 06:(X), 14 Nov 97
Current Well Status
l s287,0 , P .g ack ® Li.erSize Torque
Est TVD 6890,0 ft Hold Up ~ Liner Depth WOB
Casing S}ze ?in Cum Bit Hours Liner Weight RPM
Casing Depth ] 8203,0 R Jar Hours Liner Grade Rot Weight
Workover No. Top Liner Pick Up Wt
Rig Accept 23;00, 06 Nov 97 Water Depth 0.0 ft Circ On Btm Slack Off Wt
Rig Release Cite Off Btm Cite Rate Riser
Rolafing Time Sliding Time Torq Off Btm Circ Rate Hole
Days Program
Cost (US Dollar) Pump Status Personnel
AFE 347076
Daily Mud 0. D0
Cum Mod 0.130
Drilling Prg
Daily Comp 25950,00
Cum, Comp 328061.00
Cum. Well 328061
Fluid Type Brine
Pumpi Eft
(%)
I 97.00
Stroke Rate [ Liner Size
: (in)
(SPM) ~ 4-1/2
i
,,
,
Drtlling gluid
Circ Rate
(bbl/min)
Operator i Contractor
Service I Total
Supervisor SES$IE NEW
Engineer
Density
10.3 ppg PV
Test Tamp
9
Ann Vel DP
Ann Vel Casing
Funnel Vise
Ann Vel DC
Ann Vel Liner
29 sec/quarl
YP
Arm Vel Riser
Daily Cuttings
Curn Cuttings
Storage Site
Injection Well
Trip Gas
Cnn Gas
Fluid Type
Mud Log
Bgrnd Gas
Pore Press [EMW]
s ,
Volume i Rate Cum Vol i
I $ .~ I
(bbl) ,}(USgal/nun' (bbl)
,
'
!
Bulk Material
Fluid Source
Barite 0,00 bbl
Bentonite 0.00 bbl
Potable Water 5,05 bbl
Drill Water 0,00
Base Oil 23,81 bbl
Rig Fuel :25.24 bbl
Helit'uel 0,00 bbl
KiU Mud 0.00 bbl
Base Fluid 0.00 bbl
Cement 1 - Neat 0.00 bbl
Press
(psi)
Frz Prot Vol
(biff)
used:0.00
used;O.00
used:O.00
used:O.(X)
used:0.00
used:O.(X)
iJSed:O.(×)
used;O,O0
used:0.00
FIT TYD MAASSP
FIT EMW ECD
Kick Tol Test Press
Casing ]'est
Days Since Last BOP Test
{ I
Well Control
Stroke Rate
(SPM)
Cifc Press Loss
r
: C/L Press Loss
(ps~)
K/L Press Loss
(psi)
BP EXPLORATION
Date: 12-31-98
Trans# 90070
BP/MILNE POINT CASED HOLE LOGS
Enclosed are the materials listed below. If you have any questions please contact me in the Petrotechnical Data
Center at (907) 564-4166 ~_}. ~,~(~
Sw Name Rec Type Rec Date Company Code Comments
MPL-34 CH 23-Dec-98 PDS INJECTION PROFILE - OTHER SERV-JEWELRY LOG
"MPL-34 CH 23-Dec-98 PDS JEWELRY LOG- OTHER SERV- INJ. PROFILE
Only Bonnie Kloth receives this log.
Please sign and return one copy of this transmittal.
Thank-you,
Carla H. Mclntosh
Petrotechnical Data Center
CH LOGS
OXY
AOGCC
Bonnie Kloth
MB4-2
Petrotechnicai Data Center, MB3-3
900 East Benson Boulevard, P.O. Box 196612, Anchorage, Alaska 99519-6612
St,~Le of Alaska
Alaska Oil & Gas Conservation Comm.
Atten: Lori Taylor
3001 Porcupine Drive
Anchorage, AK 99501
Transmittal of Final Prints. Please sign and return copy to:
Western Altas Logging Services
Pouch 340013
Prudhoe Bay, AK 99734-0013
20-Nov-97
iiWell Name Services Bluelines R/F Sepia Film
i,MPL-34 I GR/CCL-PressFFemp 1 1 0
,;
i'
i'
~NOV 2 4 i997
Contact Rebecca Lange if you have a question concerning this transmittal
at (907) 659-2816 or Fax (907) 659-2602.
Schlumberger- GeoQuest
A Division of Schlumberger Technologies Corporation
500 W. International Airport Road
Anchorage, Alaska 99518 - 1199
(907) 562-7669 (Bus.) -f
(907) 563-3309 (Fax) ~
August 21, 1997
TO:
BP Exploration (Alaska) inc.
Petrotectnical Data Center MB3-3
900 E. Benson Blvd.
Anchorage, Alaska 99519-6612
d
The following data of the Depth Corrected CDR/ADN, CDR/ADN TVD'S for
well MPL-34, Job Cf 97366 was sent to:
BP Exploration (Alaska)Inc.
Petrotechnical Data Center, MB3-3
900 E. Benson Blvd.
Anchorage, AK 99519-6612
1 OH LIS Tape
3 Bluelines each
1 Film each
1 Depth Shift Display
State of Alaska
Alaska Oil & Gas Conservation
Attn: Lori Taylor
3001 Porcupine Drive
Anchorage, AK 99501
I OH LIS Tape
1 Blueline each
1 RF Sepia each
OXY USA, Inc.
Attn: Darlene Fairly
P.O. Box 50250
Midland, TX 79710
1 OH LIS Tape
1 Blueline each
1 RF Sepia each
Sent Certified Mail' Z 777 937 573
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO:
BP Exploration (Alaska)Inc.
Petrotectnical Data Center MB3-3
900 E. Benson Blvd.
Anchorage, Alaska 99519-6612
Date Delivered'
Schlumberger GeoQuest
500 W. International Airport Road
Anchorage, Alaska 99618-1199
Received b ,
·
_
LORI TAYLOR
Attn. ALASKA OIL + GAS CONSERVATION
3001 PORCUPINE DRIVE
ANCHOP~AGE
AK, 99501.
Date:
RE:
8 August 1997
Transmittal of Data
ECC #: 6860.00
Sent by: COURIER
Data: LDWG
Dear Sir/Madam,
Reference:
NORTH SLOPE, AK
Enclosed, please find the data as described below:
Tapes/Diskettes: 1
LDWG TAPE & LISTER Run # 1
Please sign and return to: Attn. Glen Horel
Western Atlas Logging Services
1200, 505 - 3rd Street S.W.
Calgary, Alberta
T2P 3E6
~ ~ Or FAX to (403) 571-1050
Received by .~~~ Date:
Transmittal
S,~,,e of Alaska
Alaska Oil & Gas Conservation Comm.
Atten: Lori Taylor
3001 Porcupine Drive
Anchorage, AK 99501 -
of Final Prints. Please sign and return copy to'
Western Altas Logging Services
Pouch 340013
Prudhoe Bay, AK 99734-0013
11-Jul-97
Well Name
R/F Sepia
Services Bluelines
SBT/GR 1
Film
MPL-34 i 1 0
Received by~ ('3
Date
Contact Rebecca Lange if you have a question concerning this transmittal
at (907) 659-2816 or Fax (907) 659-2602.
TONY KNOWLE$, GOVERNOR
ALASKA OIL AND GAS
CONSERVATION COMMISSION
3001 PORCUPINE DRIVE
ANCHORAGE, ALASKA 99501-3192
PHONE: (907) 279-1433
FAX: (907) 276-7542
May 2, 1997
Tim Schofield
Senior Drilling Engineer
BP Exploration (Alaska) Inc.
P O Box 196612
Anchorage, AK 99519-6612
Re:
Milne Point Unit MPL-34i
BP Exploration (Alaska), Inc.
Permit No. 97-80
Sur. Loc 3284'NSL, 5106'WEL, Sec. 8, T13N, R10E, UM
Btmhole Loc. 3226'NSL, 5273'WEL, Sec. 24, T13N, R9E, UM
Dear Mr. Schofield:
Enclosed is the approved application for permit to drill the above referenced well.
The permit to drill does not exempt you from obtaining additional permits required by law from
other governmental agencies, and does not authorize conducting drilling operations until all other
required permitting determinations are made.
The blowout prevention equipment (BOPE) must be tested in accordance with 20 AAC 25.035;
and the mechanical integrity (MI) of the injection wells must be demonstrated under 20 AAC
25.412 and 20 25.030(g)(3). Sufficient notice (approximately 24 hours) of the MI test before
operation, and of the BOPE test performed before drilling below the surface casing shoe, must be
given so that a representative of the Commission may witness the tests. Notice may be given by
ector on the North Slope pager at 659-3607.
David ~ ......
Chairman'x'-,....,.~
BY ORDER OF-TI:I~COMMISSION
dlf/Enclosure
cc:
Department of Fish & Game, Habitat Section w/o encl.
Department of Environmental Conservation w/o encl.
..... STATE OF ALASKA
ALASK/.._.IL AND GAS CONSERVATION CO,._.¢IISSION
PERMIT TO DRILL
20 ,~25.005
la. Type of work [] Drill [] Redrill lb. Type of well / [] Exploratory [] Stratigraphic Test [] Development Oil
[] Re-Entry [] Deepen []Service [] Development Gas [] Single Zone [] Multiple Zone
2. Name of Operator 5. Datum Elevation (DF or KB) 10. Field and Pool
BP Exploration (Alaska) Inc. Plan RTE = 50.8' Milne Point Unit / Kuparuk River
3. Address 6. Property Designation Sands
P.O. Box 196612, Anchorage, Alaska 99519-6612 ADL 025514
4. Location of well at surface 7. Unit or Property Name 11. Type Bond (See 20 AAC 25.025)
3284' NSL, 5106' WEL, SEC. 8, T13N, R10E Milne Point Unit
At top of productive interval 8. Well Number Number 2S100302630-277
3410' NSL, 5089' WEL, SEC. 24, T13N, R9E MPL-34i
At total depth 9. Approximate spud date Amount $200,000.00
3226' NSL, 5273' WEL, SEC. 24, T13N, R9E 05/07/97
12. Distance to nearest property line113. Distance to nearest well 14. Number of acres in property 15. Proposed depth (MD and TVD)
ADL 025519, 3226'I No Close Approach 2560 18398' MD / 7175' TVD
16. To be completed for deviated wells 17. Anticipated pressure {see 20 AAC 25.035 (e) (2)}
Kick Off Depth 900' Maximum Hole Angle 79.08° Maximum surface 3093 psig, At total depth (TVD) 6936' / 3787 psig
18. Casing Program Setting Depth
Size Specifications Top Bottom Quantity of Cement
Hole Casing Weight Grade Coupling Length MD TVD MD TVD (include stage data)
24" 20" 91.1# H-40 Weld 80' 32' 32' 112' 112' 250 sx Arcticset I (Approx.)
12-1/4" 9-5/8" 40# L-80 Btrc 10233' 31' 31' 10234' 4479' 1907 sx PF 'E', 1106 sx 'G'
8-1/2" 7" 26# L-80 Btrc 18368' 30' 30' 18398' 7175' 262 sx Class 'G'
19. To be completed for Redrill, Re-entry, and Deepen Operations.
Present well condition summary
Total depth: measured feet Plugs (measured)
true vertical feet
Effective depth: measured feet Junk (measured)
true vertical feet
Casing Length Size Cemented M D TVD
Structural
Conductor ,. '.....~ ',: ~ '~'
Intermediate ~ -¢ :': : '
Production ' ~'::'~"1i
Liner ..-' ,~: ':i ~- ~
-.~; !. .,'~;':.'..: ~..-- .
Perforation depth: measured
true vertical
20. Attachments [] Filing Fee [] Property Plat [] BOP Sketch [] Diverter Sketch [] Drilling Program
[] Drilling Fluid Program []Time vs Depth PIct [] Refraction Analysis [] Seabed Report [] 20 AAC 25.050 Requirements
Contact Engineer Name/Number: Lance Spencer, 564-5042 Prepared By Name/Number: Kathy Campoamor, 564-5122
21. I hereby certify that the fo.r.e~.oing is trueland col[act to the best of my knowledge /
Signed '"" ~ .... ~¢,J,¢//~, i~.'// /.~./.,~/c~7.
Tim Schofield 7i¢'/'~ ~ ~ Title Senior Drilling Engineer Date
Permit Number APl ,,,umber ~// Commission Use Only A
~'~- ~:~'O 50- ¢ ~ ¢- Z ~ ~ ~' ~' ,._A" p Date See cover letter
-' -. ~; ~' for other requirements
ConditiOns of Approval: Samples Required []Yes '~No Mud Log Required []Yes ~,No
Hydrogen Sulfide Measures []Yes~No Directional Survey Required ,~.Yes [] No
Required Working Pressure for DOPE 1--12M; E]3M; ~SM; I-'I10M; I-]15M
Othc-r'
~' '-' ~ui'~na~ Signed By by order of
Approved By O~}vid W. Johnston Commissioner the commission Date.-~
Form 10-401 Rev. 12-01-85 Submit In Triplicate
Shared Services Drilling Contact: Lance Spencer 564-5042
I Well Name:
IMPL-34i I
Type of Well (producer or injector):
Well Plan Summary
I Kuparuk Injector
Surface Location:
Kuparuk Target Location:
Bottom Hole Location:
3284' NSL, 5106' WEL, Sec. 08, T13N ,R10E, UM., AK
3410' NSL, 5089' WEL, Sec. 24, T13N, R09E, UM., AK
3226' NSL, 5273' WEL, Sec. 24, T13N, R09E, UM., AK
I AFE Number: 1337076
Rig: I Nabors 27-E
Estimated Start Date:
17 May 97 I I Operating days to complete: I 19 I
IuD: 118,398, I
I TVD: 17,175' Bkb I I KBE: 150.~ I
IWell Design (conventional, slimhole, etc.):
Milne Point Ultra Slimhole Longstring 9-5/8", 40# I
Surface X 7", 26# Longstring
I
Formation Markers:
Formation Tops MD TVD (bkb)
Base Permafrost 1807 1801 8.4 ppg, 787 psi
NA 7445 3951 8.4 ppg, 1726 psi
OB 8500 4151 8.4 ppg, 1809 psi
Base Schrader 10084 4451 8.4 ppg, 1944 psi
Top HRZ 17298 6297 8.6 ppg, 2816 psi
Base HRZ 17398 6377 8.6 ppg, 2852 psi
TKLB 17511 6467 9.8 ppg, 3296 psi
TKUD 17673 6597 9.8 ppg, 3362 psi
TKUC 17861 6747 10.5 ppg, 3684 psi
TKUB 17871 6754 10.5 ppg, 3688 psi
TKA3/-I-ARGET 17967 6831 10.5 ppg, 3730 psi
TKA2 17998 6856 10.5 ppg, 3743 psi
TKA1 18047 6895 10.5 ppg, 3765 psi
TMLV 18098 6936 10.5 ppg, 3787 psi
Total Depth 18398+ 7175+ 10.5 ppg, 3918 psi
Casing/ruE ing Program:
Hole ~ize T Csg~ Wt/Ft Grade Conn Length Top Btm
Tbg O,D. MD/I'VD MD/TVD
24" 20" 91.1# H-40 Weld 80 32/32 112/112
12 1/4" 9-5/8" 40# L-80 btrc 10233 31/31 10234/4479
8-1/2" 7" 26# L-80 btrc 18368 30/30 18398/7175
The internal yield pressure of the 7" 26# casing is 7240 psi. The deepest anticipated gas should occur no deeper
than the oil water contact which is expected below the TKA1 at _ 6936 TVDbkb In this instance, this worst case
surface pressure would occur with a full column of gas from the reservoir from a depth of __.6936 TVDbkb. The
maximum anticipated surface pressure in this case assuming a reservoir pressure of 3787 psi is 3093 psi using
a 0.1 psi/ft gas gradient, well below the internal yield pressure rating of the 7" casing.
MP L-34i (Yi) Drilling Permit 1 4/28/97
Logging Program:
Open Hole Logs:
Surface
MWD Directional from surface to TD. LWD (CDR/GR/ROP) from TOP
Schrader Bluff to TD of surface hole. DWOB/DTOQ
Intermediate N/A
Final
Cased Hole Logs:
Mud Logging
MWD Directional from 9-5/8 shoe and LWD (CDR/GR/ROP) from surface shoe
to TD - (Real Time) DWOB/DTOQ
N/A
Schlumberger IDEAL System SPIN Log: Depth, Surface and DWOB/DTOQ,
ROP, Hook Load, RPM, Pump Pressure, GPM (in and out).
M10 Power Plus:
IWOB:
GR:
CDR:
ADN:
ROP:
MWD Inclination and Azimuth
DWOB/DTOQ
Gamma Ray
Compensated Dual Resistivity
Azimuthal Density Neutron (Density, Porosity, and Sonic Caliper)
Rate of penetration
Mud Program:
Special design considerations
Special attention should be given to gravel, clay, and coal intervals
in the surface hole. Running gravel, sticky clays below the
permafrost, gas gut mud due to hydrate formation, excessive fill on
connections, tight coal sections and stuck pipe have been
encountered in previous surface holes on L-Pad. Prior to spudding
a complete review of the L-Pad drilling hazards is required.
Surface Mud Properties: I
Density Marsh Yield 10 sec 10 min pH Fluid
(PPG) Viscosity Point gel gel Loss
8.6 100 15 8 10 9 8
to to to to to to to
9.8 or less 50 35 15 30 10 15
Production Mud Properties: I LSND freshwater mud
Density Marsh Yield 10 sec 10 min pH Fluid
(PPG) Viscosity Point gel gel Loss
8.6 40 10 3 7 8.5 6-8
to to to to to to to
11.0 50 15 10 20 9.5 4-5
Well Control:
Well control equipment consisting of 5000 psi working pressure pipe rams, blind rams, and annular preventer will
be installed and is capable of handling maximum potential surface pressures. The Diverter, BOPE and drilling
fluid system schematics on file with AOGCC.
Directional:
KOP: 900'
Maximum Hole Angle: 79.08°
Close Approach Well: (No Shut In Wells) All wells may remain flowing while drilling L-34i.
MP L-34i (Yi) Drilling Permit 2 4/28/97
Disposal: No "Drilling Wastes" will be injected or disposed into L-34i while drilling this well.
Cuttings Handling: Cuttings should be hauled to the ball mill at CC-2A or other approved site for disposal. The
Milne Point reserve pit can be opened in emergencies by notifying Karen Thomas (564-4305) with request.
Fluids Handling: All drilling wastes will be hauled off and disposed of in accordance with Pertinent rules and
regulations.
GENERAL DISCUSSION
Well Objective: uce rt.~..
MPL-32 is planned as a high angle, 78°; high departure, 15,020'; ERD, 18,398; Kuparuk River A Sand prod .
~aped well profile with a final angle of 37°, will intersect the target o je~es and provide optimum
inclination for fracture stimulation. The surface casing will be deep set below the Schrader Bluff at 10,234'md
(4,479' bkb) to isolate the Ugnu and Schraber Bluff from the Kuparuk interval which should not be abnormally
pressured by area injection.
Geolo_qv
L-34i (Yi) is the first Kuparuk well to penetrate this particular fault block into the most western side of the Milne
Point Unit. This bottom location was selected to tap the eastern edge of the Kuparuk A sand accumulation which
has been developed within the Kuparuk Unit from 30 and 3K Pads. The wells are positioned to take advantage of
the injection support from the Kuparuk 30 and 3K Pad injection wells.
DRILLING HAZARDS AND RISKS SUMMARY:
Formation pressures are expected to be normal (10.5 ppg EMW) and not be affected by Kuparuk injection. The
deep set surface casing design is recommended to alleviate potential problems of differential sticking and lost
circulation in the Ugnu and Schrader Bluff while drilling the Kuparuk. The well profile has been designed to avoid
close approaches and no wells will be shut in while drilling this welt. Lost circulation and stuck pipe have occurred
but not recently and are not expected.
Close Approaches
There are no close approaches associated with the drilling of MP L-34i, however, tolerance lines should be
carefully monitored and deviations from the proposed wellpath minimized.
Water, Gas and WAG Iniection
It is expected that L-34i is in a different fault block which separates it from Kuparuk Unit Injection Wells 3R-20, 30-
07, 30-14 which have abnormally pressured the Kuparuk reservoir to the west. Kuparuk well 30-20 was recently
drilled south of L-34i location in the same fault block with a mud weights of 10.6 ppg without problems. This
provides assurance that the fault separating the blocks is sealing and L~34i would not communicate with the
Kuparuk injectors 3R-20, 30-07, 30-14, and be over pressured in the Kuparuk formation. Formation pressures are
expected to be normal at a 10.5 ppg EMW pore pressure in the Kuparuk while drilling L~34i.
Annular Injection
Currently annular injection is not permitted on L-Pad.
Lost Circulation:
Lost circulation has been most prevalent while running casing and cementing in the surface as well as production
hole. Losses are extremely probable while cementing the long string in wells with shallow set surface casing.
Losses have been experienced while drilling the 12-1/4" surface and while circulating to condition mud before,
while and after running surface casing. Major losses have also occurred while cementing the production casing. In
many instances, the losses were minimized by reducing swab and surge pressures, minimizing mud weight and
conditioning the mud before cementing.
MP L-34i (Yi) Drilling Permit 3 4/28/97
Stuck Pipe Potential:
Running gravel's, sticky clays, tight coal sections, packing off, bridging, and stuck pipe have occurred while drilling
the 12 1-4" surface holes on L-Pad. Excessive amounts of reaming have been required to condition the hole to run
surface casing after drilling the surface hole. While running 9-5/8" casing the following problems were
experienced: hole packing off; tight hole and bridging, and the 9-5/8" casing has been stuck. While drilling the
surface hole additional time has beeen spent reaming and conditioning the hole prior to cementing because of
tight hole.
While drilling the production section increased torque and drag have been experienced after drilling into Kuparuk.
This is a common occurrence has often causes difficulties, so care should be taken to avoid the stuck pipe
potential while drilling the 8 1/2" production interval. Attention should be given to The Ugnu and Schrader Bluff
formations to reduce the chances of differential sticking in these formations with higher mud's weights needed to
keep the HRZ and Kuparuk formations in balance. Differential sticking is most likely while running the production
string.
Formation Pressure:
KUPARUK C SAND
6506' TVDss 3687 PSI
10.9 PPG EMW
The deepest anticipated gas should occur no deeper than the oil water contact which is expected below the TKA1
at -,- 6,936 'rVDbkb. In this instance, this worst case surface pressure would occur with a full column of gas from
the reservoir from a depth of _+6,936 TVDbkb. The maximum anticipated surface pressure in this case assuming
a reservoir pressure of 3,887 psi is 3,093 psi. The maximum expected pore pressure for this well is 10.5 ppg
EMW (3,887 psi @ 3,093' TVDbkb). There has been injection in this region, however the reservoir pressure is not
expected to exceed this estimate. See the updated Milne Point L-Pad Data Sheet prepared by Pete Van Dusen
for information on L pad and review recent wells drilled on L Pad.
MP L-34i (Yi) Drilling Permit 4 4/28/97
MP L-34i
Kuparuk Producer
Proposed Summary of Operations
Review Pre-Spud Checklist RP-Surface Hole VI.0 pages 1-3. prior to spud.
Drill and Set 20" Conductor. Weld an FMC landing ring for an FMC Gen 5 Well head on conductor as
well as a nipple to aid in performing potential well head stability, cement job.
2. Prepare location for rig move.
3. MIRU Nabors 27E drilling rig.
,
NU and test 20" Diverter system. Ensure the diverter is as per AOGCC specifications and is
approved by an AOGCC supervisor. Build Spud Mud.
.
Drill a 12-1/4" surface hole as per directional plan. Run Directional MWD/LWD
(GR/DIR/CDR/DWOB/DTOQ) from surface to 12-1/4" TD.
6. Run 9-5/8" casing. Space out ES Type H Cementer to 1941' md.
.
Perform Two Stage Cement Job.
Complete the surface casing cementing check list.
8. ND 20" Diverter, NU and Test 13-5/8" BOP
.
MU a PDC bit on an extended power section medium speed motor, with Directional MWD and LWD
(GR/DIR/CDR/DWOB/DTOQ). RIH, Drill out Float Equipment and 20' of new formation. Perform Leak Off
Test as per Revised Recommended Practices Manual. Record pressure versus cumulative volume for
LOT test for the well file.
10.
Drill 8.5" hole to TD as per directional plan. Make sure sufficient footage is drilled to provide 250' of
production rat hole between the base of the Kuparuk A sand and PBTD before running the 7" casing.
11.
Run and Cement 7" Casing. Insure that a short joint is run in the 7" casing approximately three
joints above the top of the Kuparuk. Displace cement with 8.4 ppg filtered sea water and enough
diesel to cover from the base of permafrost to surface (+-2100' MD).
12. Test casing to 4000 psig.
13. ND BOPE and 11" drilling spool NU tubing spool and dry hole tree and Test Tree. RDMO Nabors 27E.
14. RDMO Nabors 27E.
THE WORKOVER PROGRAM WITH A DETAILED COMPLETION PROCEDURE SHALL BE SUBMITTED
ONCE THE PERFORATION INTERVALS ARE SELECTED.
MP L-34i (Yi) Drilling Permit 5 4/28/97
MP L-34i
Kuparuk Producer
9-5/8" SURFACE CASING
CEMENT PROGRAM - HALLIBURTON
Casing Size: 9-518" 40# L-80 Circ. Temp 60 deg F at 2840' TVDSS.
TWO STAGE CEMENT PROGRAM: Refer to the Two Stage Cementing Procedure
The objective of the Surface Cement is to insure that cement is circulated to surface. Second stage lead
cement shall be pumped until such time as cement is circulated to surface before switching to
displacement. Arrangements should be made to insure that sufficient cement is available so that
continuous cementing can occur uninterrupted until cement is circulated to surface. This volume may
exceed the annular capacity and the 250% estimated excess.
Note:
1. The ES Cementer is located at-i ?:,4-1' md. (~0' below the Base of the Permafrost).
2. RECIPROCATION of the CASING STRING is required WHILE CEMENTING.
3. Lead and Tail slurries are pumped in the first stage.
4. Only a Lead slurry is pumped in the second stage.
5. Dye shall be introduced into the first few bbl. of cement of the first stage and into the water before the
second stage in order to obtain an estimate of annular capacity, so that, if required additional cement can
supplied and adequate excess can be pumped.
6. Once an adequate volume of cement has been circulated to surface immediately begin displacement.
7. The WELLHEAD STABILITY CEMENT will be pumped only if the cement top falls below surface after the
pumps are shut down.
8. Utilize a large flow area float shoe.
9. Use water spacer before first stage lead slurry
10. Add dye in the water spacer before the second stage to assist in determining the annular volume.
11. Incorporate "Celloflakes" into ONLY the First Stage cement LEAD and TAIL slurries.
Caution:
1. MAKE SURE THAT THE SECOND STAGE LEAD CEMENT IS CIRCULATED TO SURFACE BEFORE
PUMPINGDISPLACEMENT.
2. Do not incorporate FLOCELE "Cello-Flakes" in the Second stage cement slurries.
3. Make preparations to handle cement to surface on the first stage circulation.
4. Make preparations to handle cement to surface on the second stage circulation.
MP L-34i (Yi) Drilling Permit 6 4/28/97
First Stage:
SPACER: 70 bbls of fresh water.
1st LEAD CEMENT TYPE:
ADDITIVES: 0.15#/sk Flocele
WEIGHT: 12.0 ppg
APPROX NO SACKS: 958
1st TAIL CEMENT TYPE:
ADDITIVES:
WEIGHT:
APPROX NO. SACKS: 1106
FLUID LOSS:
Second Stage:
SPACER: 75 bbls Water
2nd LEAD CEMENT TYPE::
ADDITIVES: None
WEIGHT:
APPROX NO SACKS:
Permafrost E
YIELD:2.17 ft3/sx MIX WATER: 11.63 gal/sk
THICKENING TIME: Greater than 4 hrs at 50° F.
Premium G
2.0% CaCl2 +.15#/sk Floceles
15.8 ppg YIELD:1.15 ft3/sx MIX WATER' 4.9 gal/sk
THICKENING TIME: Greater than 4 hrs at 50° F.
100-150 cc FREE WATER: 0
Permafrost E
12.0 ppg YIELD: 2.17 ft3/sx MIX WATER: 11.63 gal/sk
949 THICKENING TIME: Greater than 4 hrs at 50° F.
Wellhead Stability Cement
CEMENT TYPE: Permafrost E
ADDITIVES: None
WEIGHT: 12.0 ppg
APPROX NO SACKS: 150
Centralizer Placement:
.
YIELD:2.17 ft3/sx
.
MIX WATER: 11.63 gal/sk
Install one(l) Bow Spring Centralizers per joint of 9-5/8" casing on bottom 10 joints of casing
(required).
Install one(l) Bow Spring Centralizers per joint on the 9-5/8" casing on from 2200-2700 feet to
cover the top hydrate intervals (required). Place all centralizers in middle of joints using stop
collars.
MP L-34i (Yi) Drilling Permit 7 4/28/97
Surface Cement Volumes:
, 'f..
1. First Stage LEAD Cement Volume = Interval from1,941-7,045 md..,/
The estimated first stage lead cement volume from 1.~9.41-.7,045~rnd and is equivalent to the annular
volume calculated from the ES Cementer at =l~rtC'~d w~'Tch is?,00 ft below Base of the Permafrost at
1,841' md (1,834 TVD bkb) to 7,045' md which is 500' above the NA top plus 30% Excess.
.
First Stage TAIL Cement Volume = Interval from 7,045-10,234' md
The estimated first stage tail cement volume is equivalent to the annular volume calculated from the
7,045' (500' md above the NA top) to surface TD at 10,234' md (4479' TVD bkb) plus 30% excess
and the shoe joint volume. The estimated shoe joint volume is equivalent to the capacity of 80'md of
9-5/8", 40# casing.
.
Second Stage LEAD Cement Volume = Interval from 0-1,941' md
The estimated second stage lead cement volume is equivalent to the annular volume calculated from
the ES cementer located at 1,941' MD (1,931' TVDbkb). To determine excess from 1841 to surface
use 250% excess and from 1841-1941 use 30% excess.
,
The estimated Well head stability Cement Volume is 150 sacks. It will be pumped if necessary to
provide support to the well head.
Other Considerations-
1. Perform lab tests on mixed cement/spacedmud program and ensure compatibility prior to pumping job. Ensure
thickening times are adequate relative to pumping job requirement. Displace at 12 - 15 bpm. Mix slurry
on the fly -- batch mixing is not necessary.
.
After MPK-25 was suspended following problems with the surface casing job. The importance of getting a
successful cement job on the surface job cannot be stressed enough. There are changes to the spacer,
cement volumes and centralizer program on this well to improve the chances of getting cement to the
surface. If the cement falls back, do a well head stability cement job.
MP L-34i (Yi) Drilling Permit 8 4/28/97
Casing Size: 7" 26# L-80
SINGLE STAGE CEMENT JOB:
MP L-32
Kuparuk Producer
7" PRODUCTION CASING
CEMENT PROGRAM- HALLIBURTON
CIRC. TEMP: 140° F
BHST 170° F at 7040' TVDSS.
Cement from TD to 1000' above KUPARUK TKUP/UD.
SPACERs:
CEMENT TYPE: Premium G
ADDITIVES:
WEIGHT: 15.8ppg
APPROX # SACKS:
FLUID LOSS:
20 bbls fresh water and 70 bbts NSCt
0.2% CFR-3, 0.1% HR-5, 0.45% Halad 344
YIELD: 1.15 cu ft/sk MIX WATER: 5.0 gal/sk
262
THICKENING TIME: 3 1/2- 4 1/2 hrs @ 140° F
< 50cc/30 min @ 140° FREE WATER: 0cc @ 45 degree angle.
CENTRALIZER PLACEMENT:
.
7" x 8-1/4" Straight Blade Rigid Centralizers. Two per joint on the from 120' below to 120' above any
potential hydrocarbon bearing sands.
Run two (2) 7" x 8-1/4" Straight Blade Rigid Centralizers on the second full joint inside the 9-5/8" casing
shoe.
CEMENT VOLUME: Interval 16,673-t8,397'md
.
Single stage cement volume is calculated to cover 1000 FT MD above the highest potential
KUPARUK(TKUPD) production sand + 30% excess.
OTHER CONSIDERATIONS:
.
Perform lab tests on mixed cement/spacer/mud program and ensure compatibility prior to
pumping job. Ensure thickening times are adequate relative to pumping job requirement.
Displace at 8-10 bpm. Batch mixing is not necessary.
MP L-34i (Yi) Drilling Permit 9 4/28/97
~tnadrill Schlumberger
Alaska District
1111 East 80th Avenue
Anchorage, AK 99518
(907) 349-4511 Fax 344-1622
DIRECTIONAL WELL PLAN for SHARED SERVICES DRILLING
Well ......... : MPL-34 (P04)
Field ........ : Milne Point, L-Pad
Co~utation..: Minimum Curvature
Un£te ....... ;~ FEET
Surface LaU..: 70.49685682 N
Surface Long.: 149.63386201 W
Legal Description
Surface ...... : 3284 FSL 5106 FEL S08,.T13N R10E U M
Target ....... : 3410 FSL 5089 FEL S24 T13N R09~ U M
BHL .......... : 3226 FSL 5273 FB'U S24 T13N R09E UM
I~)CATIONS - ALASKa, Zone: 4
X-Coozd Y-Coord
544~74.59 6031473.69
534392.00~/602098fi.00
534209,34 6020800.47
PROI~SI~D WELL PROFILE
STATION ~-J~SURED INCIaN
IDENTIFICATION DEPTH ~ANGLE
KB 0.00 0.00
KOP / BUILD 1/100 900.00 0.00
1000.00 1.00
BUILD 1.25/100 1100.00 2.00
1200,00 3,25
DI~CTION VERTIC~-DEPTHS SECTION
AZII~ T%rD SUB-SEA DEPART
mmmamemme memmmmmm mmmmmmmm mmmmemmm
0,00 0.00 -50.80 0.00
225.05 900.00 849.20 -0.00
225.05 999.99 949,19 0.87
225.05 1099.96 1049.16 3,49
225.05 Z199.85 114'9.05 8.07
Prepared .... ,: 23 Apr 1997
Vert Bect az.: 225.05
K~ elevation.: 50.80 ft
Magnetic Dcln: +28.052 (E)
Scale Factor.~ 0.99990228
Convergence..: +0.34513068
ANADRILL AKA-DPC
APPROVED
FOR PERMITTING
ONLY
mmmmmmmlimm
m~
COORDINATES-FROM ALASKA Zone 4
WELLHFJ~D X Y
0.O0 N 0.00 E
0.00 N 0.00 E
0.62 S 0.62 #
2.47 S 2,47 W
5.70 S 5.71 W
TOOL Db/
FACE 100
544774.59 6031473.69 135L 0.00
544774.59 6031473.69 135L 0.00
544773.98 6031473~07 135~ 1.00
544772.13 6031471.21 135L 1-00
54476~,91 6031467.96 135~ 1.25
BUILD 1.5/100 1300.00 4.50
1400,00 6.00
1500.00 7.50
BUIbD 1,75/100 1600.00, 9.00
1700.00 10.75
225,05 1299,62 1248.82 14.83
225.05 1399,20 1348.40 23.98
225,05 1498.50 1447.70 35.73
225.05 1597.47 1546.67 50,08
225.05 1695.98 2645,18 67,23
10.48 S 10.49 W 544764.16 6031463.15 135L 1.25
16.94 S 16,97 W 544757.72 6031456.65 MS 1,S0
25.24 S 25,29 W 544749.46 6031448.30 HS 1.50
35,38 S 35.45 W 544739,36 6031438.10 HS 1.50
47.49 S 47.58 W 544727.30 603142S.92 ES 1.~5
~ND 1.75/100 BUILD 1971.22 12.00
BASE PERMAFROST 1807.00 12.00
225.05 1965.80 1715.00 81,27
225.05 1800,e0 1750.00 / 88.91
57.41 S 57,52 M 544717.42 6031415.94 HS 1.75
62.67 S 62,79 # 544712.19 6031410.65 HS 0.00
0
,h
(Anadrill [c)97 MP~.34P04 3.0C 3:28 PM P)
Mpt,- 34 (PO4)
STAT ! ON
~DENTIFICATION
gUILD 3/100
u
END 3/100 BUILD
NA
OB
BASE SCHRADER
9-5/8" CASING
mmmmmmmm mmmmmm
MEASURED %NCLN
DEPTH ANGLE
mlmmmmmm mmmmmm
1841,31 12.00
1900,00 13.76
2000.00 16.76
2100.00 19.76
2200,00 22.76
2300,00 25.76
2400,00 28.76
2500,00 3.1,76
2600,00 34.76
2700,00 37,76
2800.00 40.76
2900,00 43.76
3000.00 46.76
3100,00 49,76
3200,00 S2.~6
PROPOSED WELL PROFILE
mmmmmmmmm mmmmm$mmmmmsmmmmm
DIRECTION VERTICAL-DEPTHS
AZIMUTH TVD SUB-SEA
mmmmmmmmm mmmmsmmm mmmmmm~m
225.05 1834.35 1783.55
225.05 1891,'57 1840.77
225.05 1988.04 1937,24
225.05 '2082.99 2032.19
225.05 2176.18 2125.38
23 Apr 1997
mmmmmmmm tmmsmmmmmmmmmmmmmtmmm
SECTION COORDINATES-FROM
DEPART WELLHEAD
95.84 67.71 S 67,83
108.92 76.95 S 77.09
135,23 94.~3 S 95.71
166.'56 117,66 S 117.88
202,81 143.27 S 143,54
225,05 2267,34 2216.54 243,89 172.29 S 172.62
225.05 2356.22 2305.42 289,68 204.64 S 205.03
225,05 2442,59 2391.79 340.06 240,24 S 240.69
22'5.0~ 2526.20 2475.40 394.90 278.97 S 279.50
225.05 2606.83 2556,03 454;03 320.75 S 321,35
225,05 2684.25 2633.45 517,30 365,45 S 366.13
225.05 2758.26 270?.46 584.54 412.95 S 413.72
225.05 2828.64 277.7.84 655,56 463,12 S 463.99
225.05 2895.21 2844,41 930,1'7 515.82 S 516.79
225,05 2957.79 2906.99 808.15 570.91 S 571,99
3300.00 55..76 225.05 3016.20 2965.40
3400.00 58..76 225.05 3070.28 3019.48
3500.00 61,76 '225~05 3119~88 3069.08
3600.00 64,76 225.05 3164.88 3114.08
3700.00 67.76 225.05 3205.14 3154.34
3800:00 70,76
3900,00 73,76
4000.00 76'~76
4077.36 79.08
7445.38 79.08
,889,31 628,25 S 629.43
973.41 687.66 S 688.95
1060.23 748,99 S 750.40
1149.52 812.07 S 813.60
1241.05 876.73 S 878.38
225.05 3240.55 3189,75 1334.55 942.78 S 944.56
225.05 3271.02 3220.22' 1429.79 1010.06 S 1011.96
225,05 3296,46 3245.66 1526,48 1078.37 S 1080.40
225.05 3312.66 3261.86 1602,13 1131.81 S 1133.94
225.05 3950.80 3900,00 ~" 4909.13 3468.02 S 3474.54
225.05 4150.60
225,05 4450.80
225.05 4479,22
4100.00'~/5945.58 4200,21 S 4208.11
4400.00 ~ 7500.25 5298,49 S 5308.46
4428,42 7647.54 ~402.54 S $412,71
8500.95 79.08
· . .
10084.30 79,08
10234.30 79.08
Page 2
mam~mammmmmm~mmmsmmm sms~ mmmm
ALASKA Zone 4 TOOL DL/
~ Y FACE 100
544707.17 6031405.58 NS 0.00
544697,97 6031396.29 RS 3.00
$44679.46 6031377.59 HS 3,00
544657.43 6031355,33 HS 3.00
544631,93 6031329.57 HS 3.00
544603.03 6031300.38 HS 3.00
544570,82 6031267.84 HE 3.00
544535.38 6031232.03 HS 3.00
544496.81 603~193.07 HS 3.00
544455.21 6031151.05 HS 3.00
544410.70 6031106.08 HS 3.00
544363.40 6031058.30 HS 3.00
544313.45 6031007.83 HS 3.00
544260.97 6030954.82 HS 3.00
544206.11 6030899,40 HS 3.00
544149,02 6030841.73 HS 3.00
544089.86 6030781.96 HS 3.00
544028.79 6030720.27 HS 3.00
543965,98 6030656.81 H~ 3,00
543901.60 6030591,77 HS 3.00
543835.82 6030525,33 HS 3.00
543768.83 6030457.65 HS 3.00
543700.81 6030388.94 HS 3.00
543647,60 6030335.18 HS 3,00
541321.34 6027985.15 HS 0.00
540592.27 6027248,62 HS 0.00
539498.66 6026143,84 HS 0,00
539395.05 6026039.~8 HS 0.00
~D
,q
0
1'
o
o
(Anadrill
[C)97 MPI~34P04
3.0C 3:28 Ptq P)
STATION M~ASURED INCLN
IDENTIFICATION DEPTH ANGLE
mmmommmmm mmmmo tm mmmm mmmm m mm m m m m m mm
DROP 3/100 15863'.91
?9.08
78.00
75.00
72.00
69.00
PROPOSED WEbL PROFILE
mmmmmmomm m~m~fmmmmmmmummmm mmmmtmtm
DIRI~CTION VERTICAL-DEPTHS
AZIIRUTH TVD SUIt-SEA
mmtttummt ~smmmmm mmmmmmm*
225,05 5545.87 $495,07
225,05 5~53..04 S502,24
225,05 5576.39 5525,59
225,05 5604.80 5554,00
225,05 $R38.19 S587,39
SECTION
D~PART
mmmmmmmm
13176.18
13210.54
13307.77
13403.64
13497.89
66.00 225,05 ~676.46 5625,66 13590,26
63,00 225,05 5719.51 5668,71 13680,51
60,00 225.05 5767.23 5716,43 13768,3?
57,00 225,05 5819,48 5768,68 13853,63
54,00 225,05 5876,12 5825,32 13936,02
51,00
48.00
45,00
42,00
39.00
23 Apr 1997 Page 3
~ 3/100 DROP 17266,51 37.00
'fOP HRZ 17297,87 37,00
BASE HRZ 17398,04 37,00
TI(LB 17510.74 37.00
TK~TD 17673,51 37.00
TKUC 17861,33 37.00
TKUB 17871.35 37.00
TARGET ****.,..*e,*, 17966.51 37.00
TKA3 1?966.51 37.00
TKA2 17997.82 37.00
TKA1 18046,65 37.00
TMLV 19097,99 37,00
TD / 7' LINER PT 18397,99 37.00
mmumommmmmmmmmmmmmmmm mmmmmommmmmmsmmm{omt emmm mmlt
COORDINATES-FROM ALASKA Zone 4 TOOL
WELLHEAD X Y FACE 100
mmmmmommmm mmmmmmmmmm mmmmmmmmo mmmmmmmmmm mmmm mutt
9307.S0 $ '9325.01 W 535506.72 6022111.11 LS 0.00
9332.48 8 9350.04 W 53S481.84 6022085.98 LS 3.00
9401.17 S 9418.85 W S35413.45 ~022016.89 LS 3.00
9468.89 S 9486.70 W 535346.02 6021948.76 lbs 3.00
9535.48 S 9553.41 W 535279.72 6021881.79 ~S 3.00
9600.73 S 9618,79 H 535214.74 6021816.14 LS 3.00
9664.49 S 9682.67 W 535151.26 6021752.01 LS 3.00
9726,56 S 9744.86 N 535089.45 6021689.57 LS 3,00
9786.78 ~ 9805.19 W 535029.48 6021628,99 LS 3.00
9844.99 $ 9863,51 N 534971.52 60215?0.44 LS 3,00
225,05 5936.99 5886,19 14015
225,05 6001.94 5951,14 14091
225.05 6070..77 6019-97 14163
225.05 6143,31 6092,51 14232
225.05 6219.34 6168,54 14297
· 35 9901,03 S 9919,65 N 534915,72 6021514,07 L9 3,00
· 37 9954.74 S 9973.46 N 534862.24 6021460.05 LS 3,00
· 90 10005,97 S 10024.79 W 534811,22 6021408.51 L~ 3.00
.72 10054.59 S 10073,50 W 534762,81 6021359.60 LS 3.00
.65 10100.46 S 10119.46 W 534717.14 6021313.46 LS 3.00
225,05 6271.76
225,05 6296.80
225~05 6376,80
225,05 6466,80
225,05 6596,80
225,05 6746.80
225,05 6754,80
225,05 6830.80
22S.0S 6830,80
225.05 6855.80
225,05 6894,80
225.05 6935,80
225,05 7175,39
6220;96 14338.59 10129,38 S 10148.44 N 534688.34 6021284,36 HS 3.00
6246.00~ 14357'.47 10142.72 S 10161.80 W 534675.06 6021270.95 HS 0.00
6326.00~ 14417.75 10185.30 S 10204.46 W 534632.65 6021228.11 HS 0.00
6416.00/14485.57' 10233.22 S 10252.47 N 534584.95 6021179.92 HS 0.00
6546,00/ 14583.53 10302,42 S 10321.80 W 534516.04 6021110.31 HS 0.00
6696,00~14696.57 10382.27 S 10401,80 W 534436,53 6021029,98 HS 0.00
6704,00w 14702,59 10386,53 S 10406,07 W 534432,29 6021025,70 HS 0,00
6780,00 14759,86 10426,99 S 10446.60 W 534392,00 6020985,00 ~S 0,00
6780,00/14759,86 10426,99 S 10446.60 W 534392,00 6020985,00 ~$ 0.00
6805,00/14778,70 10440,30 $ 10459.94 ~ 534378.75 6020971,61 ~S 0,00
6844,00~14808,09 10461-06 S 10480,74 N S34358,08 6020950,73 HS 0.00
6885.00/14838,99 10492,88 S 10502,60 W 534336,34 6020928,77 HS 0.00
7124.59 15019,53 10610,43 S 10630,39 ~ 534209,34 6020800,47 0.00
0
(~.~adrill (c) 97 MPL34P04 3.0C 3:28 PM P)
I I [ I I Il I [ I III · n [ I [ Il ~111_ 11 1
i i [ i [l_t i i i ii i i llnl [
34 (PO4)
l~arker I~ent c on NO BKB
,~ o'. 'o oo.oo
,~ ~o,~,~,oo ~o~..~o' -o o.~ . VERTICAL SECTION VIEW
c~ ,~o. ~.~/,oo ,~oo ,~oo ~ ~.~ .
.
.
E) BULL0 1.75/!~ ~00 ~597 50 ~.00 Section at: 225.05
F) ~NO t.75/~00 BU[LO ~ t771 ~766 8t ~2.00 TVD, Scale ' ~ ~ngh = 2000 feet
Gl 8UILO 31tO0 ~8~t m34 , 96 't~.O0 Dep Scale.' J ~nch = 2000 feet
~) ENO 3/~00 BUILD a077 33t3 t602 7g.Oa Dra~n · 23 Apr ~997
I) 9-5/8' CASI~ PT t0E34 4479 764B ' 79.08
d) DROP 3/~00 t5864 55,6 .t3t75 79.08 . ':'.. _~'.... ~ .... : ......
K) E~ 3/t~ mOP t7~7 6272 't~33~ 37.oo ANADRILL ., A~-DPC' ,
L) TARGET ~.~'~ 't7967 6831 t4760 '37.00
,~ TO ~' u,,,T ~--~.' "~,~'~o~' ~.oo ' ..APPROVED
"" ' "FOR PERMI~ING.
' LY~
.,
, ~ , '
,. .. LAN
. · , · ..~. '' , '
<KB> o - -..~ " . ., · ..... ... ' ,- . . ,~_, :'_, ~ f:.....~ ... ,.. _ ......
, , . , ,
,.
......
. ', , , , ·
~000-~-:' -- '] ' ' '
' , ......
' ~ .
, .........
.
T .
V 3000 ......
~ ....
aO00- ' .... ' ......... ~ ........... ~..
.'
~000 ........ " , ......
,
[000- , ~ .' . .... , ,,,
.
.
· o ~ooo ~ooo ~ooo aooo ~m ~ooo ~ooo ~ooo
Section Departure
i Il Il I J I I ' I I
i ...................... i ii I
(~naor~ll (clg7 1,1~34P04, 3.0C 3:.36'PN PI
. .
0
0
0
Apr-23-97 03:13P Anadf-,ll DPC 907 -~44 2160 P.06
'l..
SHARED' ' ERVICES' DI ILLING
VERTICAL SECTION VIEW
~'-..~~. Section at: 225.05
. '~ mur-m~. IVD Scale' I inch = ~00 feet
Dep Scale' 1 inch = t00 feet
Drawn · 23 Apr 1997
.~ .
............. ~-a~ , ~nadril] Schlumberger
~ .... ~ .~. M~rker I~ent~flcation ~ ~B SECIN INCLN
' :
' '
'
' ,
.
' ' ' ' ' ~ " Ta~?~ (mdiu 200 fe(t )
~4400 14450 145.00 14550 ~4600 ~4650 ~4700 ~4750- '14800 14850 14900 ~4950 SSO00 ~5050 ~§~00
Section Departure
(i.nadrill (c)9~ IdPL3,(P04 3.0C 3:3~ rid p) . ' .....
MPL-34 (P04)
PLAN VIE~
S~IAIdlED S'ERVIOES DRILLIN$
CLOSURE
DE CL INA T
SCALE
DRAWN
Marker
A) KB
B) KOP
C) BUILO
BUILD
I)UILD
END
I)UILD
K} END
L)
M) 'Ti)
JFIE ..... : 15020 feet at Azimuth 225.05 _ ^~,^r~,,,
. .... .... [ "-
[NATION.: +2B.052 (E) . , . ,. AKA-DPC
~ ....... : , inch:2OOOfeet ' !
.i--
~/BUILD ~/tO0.. go0 ' O.N .0 E ,
I ~.1~i~0~ )UILO ~7~ ' )7'S '.)B M .
1~3/~ .' ' ffi4~ ' ~S ~ 6BM '
)~/~0~ ~IL~ ,, 4077 , ~)3~ S ~ (~94 ~ m '
I 3/]00 DR~" 17~7 ~0~29 S. "~O]4B ~ ' ' ' ' '
GET ~x~x~Nxx~x~ ~7967 ]04~7 S 10447 ~
/ 7" LIaR PT '~83~ 10610 S ,J0630 H .... ~ ....
· .
· ..
'
, . . , . , ,
j,. ,, / ·
,, ., '~ ,
i7000 16000 15000 I4000 i300O i2000 ILO00 10000 9000 BO00 7000 6000 5000 4000 3000 '2000 lO00 0 lO00
<- WEST ' EAST ->
[~a~lll {C}971l~1.34¢04 3.0C~ 37PNPI
0
N
0
Ap~-23-g7 03:15P AnadY-~ll DPC
g07~44 2160
P. 08
.o
WELL PERMIT CHECKLISToo. ANY
FI~.~,D ~ P0o~, .~.-~_,5-/,~ INI~ c~.Ass
/ ~ GEOL AREA
PROGRAM: expD der [] redrl[] serv~wellbore seg[] ann dtsp para req[]
UNI~# //~_~" ON/OF~ SHO~ <~.~j
ADMINISTRATION
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
Permit fee attached .................. N
Lease number appropriate ............... N
Unique well name and number .............. N
Well located in a defined pool ............. N
Well located proper distance from drlg unit boundary.. N
Well located proper distance from other wells ..... N
Sufficient acreage available in drilling unit ..... N
If deviated, is wellbore plat included ........ N
Operator only affected party ............. N
Operator has appropriate bond in force ........ N
Permit can be issued without conservation order .... N
Permit can be issued without administrative approval. N
Can permit be approved before 15-day wait ....... N
ENGINEERING
REMARKS
APPR
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
26.
27.
28.
29.
Conductor string provided ................ Y N ~ ~
Surface casing protects all known USDWs ......... Y N ;~
CMT vol adequate to circulate on conductor & surf csg. . Y N
·
CMT vol adequate to tie-in long string to surf csg . . . Y N~ ~; ~
CMT will cover all known productive horizons ...... q N ~~,~ ~ o
Casing designs adequate for C, T, B & permafrost .... N
Adequate tankage or reserve pit ............. ~ N
If a re-drill, has a 10-403 for abndnmnt been approved. ~k~~
Adequate wellbore separation proposed .......... ~_ N
If diverter required, is it adequate .......... i~N ~___~- ~
Drilling fluid program schematic & equip list adequate N
BOPEs adequate ................ N
BOPE press rating adequate; test to s g
Choke manifold complies w/API RP-53 (May 84) ...... N
Work will occur without operation shutdown ....... ~ N
Is presence of H2S gas probable ............ ~ N
GEOLOGY
30. Permit can be issued w/o hydrogen sulfide measures .... Y N/
31. Data presented on potential overpressure zones ..... Y//~ ~ ~ ~
32. Seismic analysis of shallow gas zones .......... y N /~,,-~/~/ .
33. Seabed condition survey (if off-shore) ........ /Y N /
34. Contact name/phone for weekly progress reports . . ./< . Y N
[exploratory only]
GEOLOGY:
ENGINEERING: COMMISSION:
JD"'~- mcm ' -
Comments/Instructions:
HOWldlf- A:\FORMS\cheklist rev 01/97
Well History File
APPENDIX
Information of detailed nature that is not
particularly germane to the Well Permitting Process
but is part of the history file.
To improve the readability of the Well History file and to
simplify finding information, information of this
nature is accumulated at the end of the file under APPENDIX.
No special effort has been made to chronologically
organize this category of information.
* ALASKA COMPUTING CENTER *
...... SCHL~4BERGER
* ............................ .
COMPANY NAME : BP EXPLORATION (ALASKA) INC.
WELL NAME : MPL - 34
FIELD NAME : MILNE POINT
BOROUGH : NORTH SLOPE
STATE : ALASKA
API NUMBER : 500292276600
REFERENCE NO : 97366
ALASKA COMPUTING CENTER *
.
....... SCHL~4BERGER
COMPANY NAME : BP EXPLORATION (ALASKA) INC.
WELL NAME : MPL ~ 34
FIELD NAME : MILNE POINT
BOROUGH : NORTH SLOPE
STATE : ALASKA
API NUMBER : 500292276600
REFERENCE NO : 97366
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
20-AUG-1997 14:48
PAGE
**** REEL HEADER ****
SERVICE NAME : EDIT
DATE · 97/08/20
ORIGIN · FLIC
REEL NAME : 97366
CONTINUATION # :
PREVIOUS REEL :
CO~4MENT · B.P. EXPLORATION, MILNE POINT MPL-34, API #50-029-22766-00
**** TAPE HEADER ****
SERVICE NAME : EDIT
DATE : 97/08/20
ORIGIN · FLIC
TAPE NAME : 973 66
CONTINUATION # : 1
PREVIOUS TAPE :
COGENT · B.P. EXPLORATION, MILNE POINT MPL-34, API #50-029-22766-00
TAPE HEADER
Milne Point
£,YWD/~AD LOGS
#
WELL N~E :
API NUMBER:
OPERATOR:
LOGGING COMPANY:
TAPE CREATION DATE:
JOB DATA
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
SURFACE LOCATION
BIT RUN 1
.........
97366
LEBLANC
P YR ON
SECTION:
TOWNSHIP:
RANGE:
FNL:
FSL:
FEL:
F~ :
ELEVATION (FT FROM MSL O)
KELLY BUSHING:
DERRICK FLOOR:
GROUND LEVEL:
WELL CASING RECORD
1ST STRING
2NDSTRING
MPL - 34
500292276600
BP EXPLORATION (ALASKA) INC.
SCHLUMBERGER WELL SERVICES
20-AUG-97
BIT RUN 2
.........
97366
LEBLANC
PYRON
BIT RUN 3
8
13N
iOE
3284
5106
52.88
52.88
17.10
OPEN HOLE CASING DRILLERS
BIT SIZE (IN) SIZE (IN) DEPTH (FT)
8.500 9.625 9773.0
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
20-AUG-1997 14: 48
3RD STRING
PRODUCTION STRING
RE,lARKS:
Well drilled ll-~AY through 22-F~Y-97 ~¢ith CDR and
CDR/ADN. All data was collected in two bit runs.
$
$
PAGE:
**** FILE HEADER ****
FILE NAME : EDIT .001
SERVICE : FLIC
VERSION : O01CO1
DATE : 97/08/20
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
FILE HEADER
FILE ArO~,IBER: 1
EDITED MERGED MWD
Depth shifted and clipped curves; all bit runs merged.
DEPTH INCREMENT: 0.5000
FILE SURmiARY
LDWG TOOL CODE
$
BASELINE CURVE FOR SHIFTS: GR
CURVE SHIFT DATA (MEASURED DEPTH)
START DEPTH STOP DEPTH
7150.0 18350.0
BASELINE DEPTH
..............
88888.0
18022.5 18063.0
18017.0 18057 0
18013.0 18053 5
17997.5 18037 0
17990.0 18029 0
17985.0 18024 5
17971.0 18011 0
17962.5 18001 5
17956.5 17997 0
17895.5 17937 0
17880.0 17921 0
17830.5 17872 5
17808.5 17850 5
17801.5 17843 0
17795.0 17836.0
17780.5 17822.5
17767.0 17808.5
17744.5 17785.5
.......... EQUIVALENT UNSHIFTED DEPTH ..........
88928.5
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
20-AUG-1997 14:48
PAGE:
17730.5
17715.0
17690.0
17672.0
17663.0
17632.5
17623.0
17615.5
17571.0
17563.0
17551.5
17548.0
17480.5
17445.5
17433.0
17370.5
17336.0
17319.0
17293.5
17273.5
! 7265.5
17261.5
17213.0
17189 5
17164 5
17152 0
17140 0
17132 5
17090 5
17057 5
17014 0
17007 0
16955 5
16928 0
16912.0
16909.0
16880.5
7150.0
$
MERGED DATA SOURCE
LDWG TOOL CODE
$
REMARKS:
17772.5
17755.0
17730.0
17712.5
17704.0
17673.0
17663.5
17655.5
17611.5
17604.5
17592.5
17588.0
17521.0
17486.0
17472.5
17410.5
17373.5
17356.0
17334 0
17314 5
17307 0
17301 5
17256 0
17231 5
17206 5
17192 0
17180.0
17171.5
17133.0
17100.5
17056.5
17049.0
16996.5
16971.0
16958.0
16954.0
16924.5
7150.0
BIT RUN NO. MERGE TOP MERGE BASE
1 7150.0 9800.0
2 9700.0 18350.0
The depth adjustments shown above reflect the MWD GR
to the PDC GRCH logged by WA. All other MWD curves
were carried with the GR. This file also contains the
Very Enhanced QRO resisitivity with 2' average that
was reprocessed at GeoQuest. The ADN quadrant outputs
are as follows: ROBB/ROBU/ROBL/ROBR are bottom, upper,
left, and right quadrant density; and are also listed
as RHO1, RH02, RH03, RH04 in the LDWG listing. The
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
20-AUG-1997 14:48
PAGE:
other outputs (Delta Rho, PEF, Max. Density) are listed
with their quadrants as DRHB/DRHU/DRHL/DRHR, PEB/PEU/
PEL/PER, and ROMB/ROMU/ROML/ROMR. The LDWG outputs of
CALA and CALS are PLDIA and VDIA respectively.
$
LIS FORe,AT DATA
** DATA FORMAT SPECIFICATION RECORD **
** SET TYPE - 64EB **
TYPE REPR CODE VALUE
1 66 0
2 66 0
3 73 80
4 66 1
5 66
6 73
7 65
8 68 0.5
9 65 FT
11 66 12
12 68
13 66 0
14 65 FT
15 66 68
16 66 1
0 66 0
** SET TYPE - CHAN **
NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX)
DEPT FT 4000047 O0 000 O0 0 1 1 1 4 68 0000000000
FET MWD HR 4000047 O0 000 O0 0 1 1 1 4 68 0000000000
RA MWD OP2~ 4000047 O0 000 O0 0 1 1 1 4 68 0000000000
RP MWD OHjV~44000047 O0 000 O0 0 1 1 1 4 68 0000000000
VRA MWD OH~4M4000047 O0 000 O0 0 1 1 1 4 68 0000000000
VRP MWD OH~M 4000047 O0 000 O0 0 1 1 1 4 68 0000000000
DER MWD OHMM4000047 O0 000 O0 0 1 1 1 4 68 0000000000
ROP MWD FPHR 4000047 O0 000 O0 0 1 1 1 4 68 0000000000
GR MWD GAPI 4000047 O0 000 O0 0 1 1 1 4 68 0000000000
RHOBMWD G/C3 4000047 O0 000 O0 0 1 1 1 4 68 0000000000
RHO1 MWD G/C3 4000047 O0 000 O0 0 1 1 1 4 68 0000000000
RH02 MWD G/C3 4000047 O0 000 O0 0 1 1 1 4 68 0000000000
RH03 MWD G/C3 4000047 O0 000 O0 0 1 1 1 4 68 0000000000
RH04 MWD G/C3 4000047 O0 000 O0 0 1 1 1 4 68 0000000000
DRHOMWD G/C3 4000047 O0 000 O0 0 1 1 1 4 68 0000000000
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
20-AUG-1997 14:48
PAGE
NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD i~J?,IBSAMP ELEM CODE (HEX)
PEF ~WD BN/E 4000047 O0 000 O0 0 1 1 1 4 68 0000000000
DCALMWD IN 4000047 O0 000 O0 0 1 1 1 4 68 0000000000
CALS ~D IN 4000047 O0 000 O0 0 1 ! 1 4 68 0000000000
CALAMWD IN 4000047 O0 000 O0 0 1 1 1 4 68 0000000000
NPHIMWD PU-S ~000047 O0 000 O0 0 ! 1 1 4 68 0000000000
** DATA **
DEPT. 18350.000 FET.MWD -999.250 RA.MWD -999.250 RP.~D
VP~.MWD -999.250 VRP.~D -999.250 DER.~D -999.250 ROP.~WD
GR.~WD -999.250 RHOB.MWD -999.250 RHOi.[~FD -999.250 RHO2.MWD
RHO3.MWD -999.250 RH04.~4~'~ -999.250 DRHO.~D -999.250 PEF.RS~D
DCA~.MWD -999.250 CALS.~WD -999.250 CALA.MWD -999.250 NPHI.M~D
DEPT. 7150.000 FET.~WD -999.250 RA.MWD -999.250 RP.M~
VRA.f~D -999.250 VRP.~'~ -999.250 DER.MWD -999.250 ROP.~fWD
GR.~D 62.297 RHOB.~FWD -999.250 RHO1.MWD -999.250 RHO2.MWD
RH03.~,~ -999.250 RHO4.~D -999,250 DRHO.~D -999.250 PEF.~D
DCAL,~,~D -999.250 CALS.MWD -999.250 CALA.~D -999.250 NPHI.~D
-999.250
108.566
-999.250
-999.250
-999.250
-999.250
-999.250
-999.250
-999.250
-999.250
** END OF DATA **
**** FILE TRAILER ****
FILE NAME : EDIT .001
SERVICE : FLIC
VERSION · O01CO1
DATE : 97/08/20
MA~REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
**** FILE HEADER ****
FILE NAME : EDIT .002
SERVICE : FLIC
VERSION ' O01CO1
DATE : 97/08/20
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
FILE HEADER
FILE NUMBER
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
20-AUG-1997 14:48
PAGE:
RAW MWD
Curves and log header data for each bit run in separate files.
BIT RUN ~FUMBER: l
DEPTH INCR~4ENT: O. 5000
FILE SUNmlARY
VEATDOR TOOL CODE START DEPTH
MWD 7149.5
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE:
SURFACE SOF~gARE VERSION:
DO[,~OLE SOF~¢ARE VERSION:
DATA TYPE (M~X. ORY or REAI~-TIME) :
TD DRILLER (FT) :
TOP LOG INTERVAL (FT) :
BOTTOM LOG INTERVAL (FT) :
BIT ROTATING SPEED (RPM) :
HOLE INCLINATION (DEG) MINIMO?4 ANGLE:
MAXIMUM A~VGLE :
STOP DEPTH
..........
9800.0
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
.........................
CDR RESIST./GR
$
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN)
DRILLERS CASING DEPTH (FT)
BOREHOLE CONDITIONS
MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S) :
MUD PH:
MUD CHLORIDES (PPM) :
FLUID LOSS (C3):
RESISTIVITY (Otk/k4) AT TEMPERATURE (DEGF) :
MUD AT MEASURED TEMPERATURE (MT):
MUD AT MAX CIRCULATIONG TEMPERATURE :
MUD FILTRATE AT (MT):
MUD CAKE AT (MT):
NEUTRON TOOL
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL STANDOFF (IN):
mCR FREQUENCY (HZ):
22-MAY-97
FAST 4.0
4. OC
MEMORY
18310.0
7150.0
18310.0
6O
79.0
80.0
TOOL NUMBER
...........
CDR8044
8. 500
9773.0
LSND
11.10
42.0
2.340 68.0
1. 950 68.0
20000
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
20-AUG-1997 14:48
PAGE:
REMARKS: *** RUN ! INTERVAL 7211' - 9800'***
BIT TO GR: 61.86, BIT TO RES: 51.28
8.25" CDR RUN IN 12.25" HOLE
*** RUN 2 INTERVAL 9800' - 18310'***
BIT TO GR: 75.63, BIT TO RES: 64.63
BIT TO DEN: 118.99, BIT TO NEU: 123.12
GR CORRECTED FOR HOLE SIZE, MUD
TNPH CORR. FOR HOLE SIZE, HI, SALINITY, TEMP.
$
LIS FORMAT DATA
* * DATA FOPJ,IAT SPECIFICATION RECORD * *
* * SET TYPE - 64EB **
TYPE REPR CODE VALUE
1 66 0
2 66 0
3 73 36
4 66 1
5 66
6 73
7 65
8 68 0.5
9 65 FT
11 66 28
12 68
13 66 0
14 65 FT
15 66 68
16 66 1
0 66 1
** SET TYPE - CHAN **
NAME SERV UNIT SERVICE API API API API FILE NU~IB NU?4B SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD ~Ft~IB SAMP ELEM CODE (HEX)
DEPT FT 4000047 O0 000 O0 0 2 1 1 4 68 0000000000
ATR LW1 0~4M4000047 O0 000 O0 0 2 1 1 4 68 0000000000
PSR LW1 OH~M4000047 O0 000 O0 0 2 1 1 4 68 0000000000
ATVR LW1 0H~14000047 O0 000 O0 0 2 1 1 4 68 0000000000
PSVR LW! OH~ff4 4000047 O0 000 O0 0 2 1 1 4 68 0000000000
DER LW1 OP~4M4000047 O0 000 O0 0 2 1 1 4 68 0000000000
ROPE LWl F/HR 4000047 O0 000 O0 0 2 1 1 4 68 0000000000
GR LW1 GAPI 4000047 O0 000 O0 0 2 1 1 4 68 0000000000
TABR LW1 4000047 O0 000 O0 0 2 1 1 4 68 0000000000
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
20-AUG-1997 14:48
PAGE:
** DATA **
DEPT. 9800. 500 ATR. LW1 -999. 250 PSR. LW1 -999. 250 ATVR. LW1
PSVR. LWt -999. 250 DER. LW1 -999. 250 ROPE. LW1 98. 897 GR. LW1
TABR. LW1 -999. 250
DEPT. 7149.500 ATR.LW1 -999.250 PSR.LW1 -999.250 ATVR.LW1
PSVR.LW1 -999.250 DER.LW1 -999.250 ROPE.LW1 -999.250 GR.LW1
TABR. LW1 - 999. 250
-999.250
-999.250
-999.250
63.129
** E~VD OF DATA **
**** FILE TRAILER ****
FILE NAME : EDIT .002
SERVICE · FLIC
VERSION : O01CO1
DATE · 97/08/20
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
**** FILE HEADER ****
FILE NAME : EDIT .003
SERVICE : FLIC
VERSION : O01CO1
DATE : 97/08/20
~REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
FILE HEADER
FILE NIIMBER 3
P~AW
Curves and log header data for each bit run in separate files.
BIT RUNNUMBER: 2
DEPTH INCRET4ENT: 0.5000
FILE S~4MARY
VENDOR TOOL CODE START DEPTH STOP DEPTH
MWD 9678.0 18310.0
$
LOG HEADER DATA
DATE LOGGED: 22-MAY-97
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
20-AUG-1997 14:48
PAGE:
SOFTWARE:
SURFACE SOFT~ZARE VERSION:
DOWNHOLE SOFT~gARE VERSION:
DATA TYPE (F~MORY or REAL-TIME):
TD DRILLER (FT) :
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT) :
BIT ROTATING SPEED (RPM) :
HOLE INCLINATION (DEG)
MINIMUM ANGLE '.
MAXIMUM ANGLE:
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
CDR RESIST./GR
ADN AZ. DENS./NEUT.
$
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLERS CASING DEPTH (FT) :
FAST4.0
4.0C
MF~.IORY
18310.0
7150.0
18310.0
6O
30.0
80.0
TOOL NUMBER
CDR751
AD~I059
8.500
9773.0
BOREHOLE CONDITIONS
MUD TYPE: LSND
MUD DENSITY (LB/G): 1 !. ! 0
MUD VISCOSITY (S) : 42.0
MUD PH:
MUD CHLORIDES (PPM) : 600
FLUID LOSS (C3):
RESISTIVITY (OH~) AT TEMPERATURE (DEGF) :
MUD AT MEASURED TEMPERATURE (MT): 2.340
MUD AT MAX CIRCULATIONG TEMPERATURE :
MUD FILTRATE AT (MT): 1. 950
MUD CAKE AT (MT):
NEUTRON TOOL
MATRIX: SANDSTONE
MATRIX DENSITY: 2.65
HOLE CORRECTION (IN):
TOOL STANDOFF (IN): O. 5
B~,'~ FREQUENCY (HZ): 20000
R~ARKS: *** RUN 1 INTERVAL 7211' - 9800'***
BIT TO GR: 61.86, BIT TO RES: 51.28
8.25" CDR RUN IN 12.25" HOLE
*** RUN 2 INTERVAL 9800' - 18310'***
BIT TO GR: 75.63, BIT TO RES: 64.63
BIT TO DEN: 118.99, BIT TO NEU: 123.12
GR CORRECTED FOR HOLE SIZE, MUD WT.
TNPH CORR. FOR HOLE SIZE, HI, SALINITY, TEMP.
$
LIS FORMAT DATA
68.0
68.0
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
20-AUG-1997 14:48
PAGE
10
DATA FOR~.~_AT SPECIFICATION RECOPd9 **
* * SET TYPE - 64EB * *
TYPE REPR CODE VALUE
1 66 0
2 66 0
3 73 108
4 66 1
5 66
6 73
7 65
8 68 0.5
9 65 FT
11 66 9
12 68
13 66 0
14 65 FT
15 66 68
16 66 1
0 66 i
** SET TYPE - CHAN **
NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD b~JMB SAMP ELEM CODE (HEX)
DEPT FT 4000047 O0 000 O0 0 3 1 1 4 68 0000000000
ATR LW2 0H~4000047 O0 000 O0 0 3 1 1 4 68 0000000000
PSR LW2 OHYk4 4000047 O0 000 O0 0 3 1 1 4 68 0000000000
ATVRLW2 0H~4~4000047 O0 000 O0 0 3 1 1 4 68 0000000000
PSVR LW2 OPl~i~ 4000047 O0 000 O0 0 3 1 1 4 68 0000000000
DER LW2 OHMM4000047 O0 000 O0 0 3 1 1 4 68 0000000000
ROPE LW2 F/HR 4000047 O0 000 O0 0 3 1 1 4 68 0000000000
GR LW2 GAPI 4000047 O0 000 O0 0 3 1 1 4 68 0000000000
TABR LW2 4000047 O0 000 O0 0 3 1 1 4 68 0000000000
ROMB LW2 G/C3 4000047 O0 000 O0 0 3 1 1 4 68 0000000000
ROBB LW2 G/C3 4000047 O0 000 O0 0 3 1 1 4 68 0000000000
ROBU LW2 G/C3 4000047 O0 000 O0 0 3 i I 4 68 0000000000
ROBL LW2 G/C3 4000047 O0 000 O0 0 3 i 1 4 68 0000000000
ROBR LW2 G/C3 4000047 O0 000 O0 0 3 1 1 4 68 0000000000
DRHB LW2 G/C3 4000047 O0 000 O0 0 3 1 1 4 68 0000000000
DRHU LW2 G/C3 4000047 O0 000 O0 0 3 1 1 4 68 0000000000
DRHL LW2 G/C3 4000047 O0 000 O0 0 3 1 1 4 68 0000000000
DRHR LW2 G/C3 4000047 O0 000 O0 0 3 1 1 4 68 0000000000
PEB LW2 4000047 O0 000 O0 0 3 1 1 4 68 0000000000
PEU LW2 4000047 O0 000 O0 0 3 1 1 4 68 0000000000
PEL LW2 4000047 O0 000 O0 0 3 1 1 4 68 0000000000
PER LW2 4000047 O0 000 O0 0 3 1 1 4 68 0000000000
TNPH LW2 PU 4000047 O0 000 O0 0 3 1 1 4 68 0000000000
DCALLW2 IN 4000047 O0 000 O0 0 3 1 1 4 68 0000000000
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
20-AUG-1997 14:48
PAGE: 11
NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS
ID ORDER # LOG TYPE CLASS MOD ~KP_.IB S~:iP ELEM CODE (HEX)
HDIA LW2 IN 4000047 O0 000 O0 0 3 1 1 4 68 0000000000
VDIA LW2 IN 4000047 O0 000 O0 0 3 1 1 4 68 0000000000
RPM LW2 RPM 4000047 O0 000 O0 0 3 1 1 4 68 0000000000
** DATA **
DEPT.
PSVR . LW2
TABR . LW2
ROBL . LW2
Dt~L . LW2
PEL . LW2
HDIA. LW2
18309 500 ATR.LW2
-999 250 DER. LW2
-999 250 ROMB. LW2
-999 250 ROBR.LW2
-999 250 DRHR.LW2
-999 250 PER. LW2
-999 250 VDIA.LW2
DEPT.
PSVR . LW2
TABR . LW2
ROBL . LW2
DR_HL. LW2
PEL. LW2
HDIA . LW2
9678 000 ATR. LW2
-999 250 DER.LW2
-999 250 ROMB. LW2
-999 250 ROBR.LW2
-999 250 DRHR. LW2
-999 250 PER. LW2
-999 250 VDIA. LW2
-999. 250 PSR. LW2
-999. 250 ROPE. LW2
-999. 250 ROBB. LW2
-999.250 DRHB.LW2
- 999.250 PEB. LW2
- 999.250 TNPH. LW2
-999. 250 RPM. LW2
-999. 250 PSR. LW2
-999. 250 ROPE. LW2
-999. 250 ROBB. LW2
-999. 250 DRHB. LW2
-999. 250 PEB. LW2
- 999.250 TNPH. LW2
-999. 250 RPM. LW2
-999 250 ATVR.LW2
108 566 GR.LW2
-999 250 ROBU. LW2
-999 250 DRHU. LW2
-999 250 PEU. LW2
-999 250 DCAL.LW2
-999 250
-999 250 ATVR.LW2
-999 250 GR.LW2
-999 250 ROBU. LW2
- 999250 DRHU. LW2
-999 250 PEU. LW2
-999 250 DCAL.LW2
-999 250
-999.250
-999.250
-999.250
-999.250
-999.250
-999.250
-999.250
-999.250
-999.250
-999.250
-999.250
-999.250
** ~2~D OF DATA **
**** FILE TRAILER ****
FILE NAME : EDIT .003
SERVICE · FLIC
VERSION · O01CO1
DATE : 97/08/20
MAX REC SIZE : 1024
FILE TYPE : LO
LAST FILE :
**** TAPE TRAILER ****
SERVICE NAME : EDIT
DATE · 97/08/20
ORIGIN · FLIC
TAPE NAME : 97366
CONTINUATION # : 1
PREVIOUS TAPE :
CO~T4ENT · B.P. EXPLORATION, MILNE POINT MPL-34, API #50-029-22766-00
LIS Tape Verification Listing
Schlumberger Alaska Computing Center
20-AUG-1997 14:48
PAGE
12
**** REEL TRAILER ****
SERVICE NAME : EDIT
DATE : 97/08/20
ORIGIN · FLIC
REEL NAME : 97366
CONTINUATION # :
PREVIOUS REEL :
CO~94ENT : B.P. EXPLORATION, MILNE POINT MPL-34, API #50-029-22766-00
'
MPL-34
MILNE
POINT
====================================
~ili~i ======================== ........... ~
Run 1'
0:3 - July - 1997
GRCH Marked Line
(Cased Hole)
WESTERN
ATLAS
Logging
Services
9667'
18081'
RECE
Tape Subfile 2 is type:
TAPE HEADER
MILNE POINT UNIT
CASED HOLE WIRELINE LOGS
WELL NAME:
API NIIMBER:
OPERATOR:
LOGGING COMPANY:
TAPE CREATION DATE:
JOB NIIMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
SURFACE LOCATION
SECTION:
TOWNSHIP:
RANGE:
FNL:
FSL:
FEL:
FWL:
ELEVATION(FT FROM MSL 0)
KELLY BUSHING:
DERRICK FLOOR:
GROUND LEVEL:
WELL CASING RECORD
MPL - 34
500292276600
BP EXPLORATION (ALASKA) INC.
WESTERN ATLAS LOGGING SERVICES
07-AUG-97
6860.00
L. KOENN
M. O'MALALEY
8
13N
10E
3284
5106
52.88
52.88
17.10
GRCH.
LOG RUN DEPTH CORRECTED TO WIRE LINE MARKS.
THE GAMMA RAY FROM THE MAIN PASS OF THIS LOG IS
THE DEPTH REFERENCE FOR THIS WELL.
GR
GRCH
1
1
03-JUL-97
WESTERN ATLAS
EQUIVALENT UNSHIFTED DEPTH
$
REMARKS:
BASELINE DEPTH
PBU TOOL CODE:
PBU CURVE CODE:
RUN NUMBER:
PASS NUMBER:
DATE LOGGED:
LOGGING COMPANY:
OPEN HOLE CASING DRILLERS CASING
BIT SIZE (IN) SIZE (IN) DEPTH (FT) WEIGHT (LB/FT)
1ST STRING
2ND STRING 20.000 112.0 91.10
3RD STRING 9.625 9779.0 40.00
PRODUCTION STRING 7.000 18278.0 26.00
CURVE SHIFT DATA - ALL PASSES TO STANDARD (MEASURED DEPTH)
BASELINE CURVE FOR SHIFTS
FILE HEADER
FILE NUMBER: 1
EDITED CURVES
Depth shifted and clipped curves for each pass in separate files.
PASS NUMBER: 1
DEPTH INCREMENT: .5000
FILE SUMMARY
PBU TOOL CODE START DEPTH STOP DEPTH
GRCH 16873.0 18081.0
$
CURVE SHIFT DATA - PASS TO PASS (MEASURED DEPTH) BASELINE CURVE FOR SHIFTS
PBU CURVE CODE GRCH
PASS NUMBER: 1
BASELINE DEPTH
$
EQUIVALENT UNSHIFTED DEPTH
REMARKS:
PASS 1 (MAIN PASS) .
THE GAMMA RAY FROM THIS PASS IS THE DEPTH REFERENCE FOR
THIS WELL.
CN
WN
FN
COUN
STAT
: BP EXPLORATION (ALASKA)
: MPL - 34
: MILNE POINT
: NORTH SLOPE
: ALASKA
* FORMAT RECORD (TYPE# 64)
ONE DEPTH PER FRAME
Tape depth ID: F
2 Curves:
Name Tool Code Samples Units
1 GRCH GR 68 1 GAPI 4
2 TENS GR 68 1 LB 4
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
4 30 995 99 1
4 30 995 99 1
* DATA RECORD (TYPE# 0) 1014 BYTES *
Total Data Records: 31
Tape File Start Depth = 18155.000000
Tape File End Depth = 16865.000000
Tape File Level Spacing = 0.500000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68 7744 datums
Tape Subfile: 2 117 records...
Minimum record length: 62 bytes
Maximum record length: 1014 bytes
Tape Subfile 3 is type: LIS
FILE HEADER
FILE NUMBER: 2
EDITED CURVES
Depth shifted and clipped curves for each pass in separate files.
PASS NUMBER: 2
DEPTH INCREMENT: .5000
FILE SUMMARY
PBU TOOL CODE START DEPTH STOP DEPTH
GRCH 9667.0 16954.0
$
CURVE SHIFT DATA - PASS TO PASS (MEASURED DEPTH) BASELINE CURVE FOR SHIFTS
PBU CURVE CODE GRCH
PASS NUMBER: 1
BASELINE DEPTH GRCH
16879.5 16879.5
16917.5 16917.5
$
EQUIVALENT UNSHIFTED DEPTH
REMARKS:
PASS 2 (GR/CCL PASS).
TENS WAS SHIFTED WITH GRCH.
CN
WN
FN
COUN
STAT
/ ? ?MATCH2. OUT
$
: BP EXPLORATION (ALASKA)
: MPL - 34
: MILNE POINT
: NORTH SLOPE
: ALASKA
* FORMAT RECORD (TYPE# 64)
ONE DEPTH PER FRAME
Tape depth ID: F
2 Curves:
Name Tool Code Samples Units
1 GRCH GR 68 1 GAPI 4
2 TENS GR 68 1 LB 4
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
4 30 995 99 1
4 30 995 99 1
* DATA RECORD (TYPE# 0) 1014 BYTES *
Total Data Records: 176
Tape File Start Depth = 17005.000000
Tape File End Depth = 9650.000000
Tape File Level Spacing = 0.500000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68
44134 datums
Tape Subfile: 3
210 records...
Minimum record length:
Maximum record length:
62 bytes
1014 bytes
Tape Subfile 4 is type: LIS
FILE HEADER
FILE NUMBER: 3
EDITED CURVES
Depth shifted and clipped curves for each pass in separate
PASS NUMBER: 3
DEPTH INCREMENT: .5000
FILE SUMMARY
PBU TOOL CODE
GRCH
$
CURVE SHIFT DATA -
START DEPTH
17813.0
PASS TO PASS
BASELINE CURVE FOR SHIFTS
PBU CURVE CODE GRCH
PASS NUMBER: 1
BASELINE DEPTH GRCH
17821.0 17822.0
17823.0 17823.5
17835.5 17836.5
17839.0 17839.5
17842.0 17842.5
17849.5 17850.5
17863.0 17864.0
17869.0 17870.0
17872.5 17874.0
17875.5 17877.0
17898.0 17899.0
17914.5 17916.5
17921.5 17922.5
17924.0 17925.5
17926.5 17928.0
17939.5 17941.0
17949.0 17951.0
17967.5 17969.0
17974.5 17976.0
17979.5 17981.5
17991.0 17993.0
17995.0 17996.5
18001.5 18003.0
18024.5 18026.5
18037.0 18038.5
18055.0 18056.5
18063.5 18064.5
$
REMARKS:
files.
STOP DEPTH
18081.0
(MEASURED DEPTH)
EQUIVALENT UNSHIFTED DEPTH
PASS 3 (REPEAT PASS).
TENS WAS SHIFTED WITH GRCH.
/ ? ?MATCH3. OUT
$
CN : BP EXPLORATION (ALASKA)
WN : MPL - 34
FN : MILNm POINT
COUN : NORTH SLOPE
STAT : ALASKA
* FORMAT RECORD (TYPE# 64)
ONE DEPTH PER FRAME
Tape depth ID: F
2 Curves:
Name Tool Code Samples Units
1 GRCH GR 68 1 GAPI
2 TENS GR 68 1 LB
* DATA RECORD (TYPE# 0) 1014 BYTES *
Total Data Records: 9
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
4 30 995 99 1
4 30 995 99 1
Tape File Start Depth = 18155.000000
Tape File End Depth = 17801.000000
Tape File Level Spacing = 0.500000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68 9872 datums
Tape Subfile: 4 68 records...
Minimum record length: 62 bytes
Maximum record length: 1014 bytes
Tape Subfile 5 is type: LIS
FILE HEADER
FILE NUMBER: 4
RAW CURVES
Curves and log header data for each pass in separate files; raw background
pass in last file.
PASS NUMBER: 1
DEPTH INCREMENT: .2500
FILE SUMMARY
VENDOR TOOL CODE START DEPTH
GR 16873.0
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE VERSION:
TIME LOGGER ON BOTTOM:
TD DRILLER (FT) :
TD LOGGER (FT) :
TOP LOG INTERVAL (FT) :
BOTTOM LOG INTERVAL (FT) :
LOGGING SPEED (FPHR) :
DEPTH CONTROL USED (YES/NO):
STOP DEPTH
18108.0
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
SWIV SWIVEL SUB
ROLL ROLLER SUB
CCL COLLAR LOCATOR
GR GAMMA RAY
AC ACOUSTILOG COMMON
ROLL ROLLER SUB
SBT SEGMENTED BOND TOOL
ROLL ROLLER SUB
VDL VDL SUB
ROLL ROLLER SUB
GYRO GYRO TOOL
ROLL ROLLER SUB
$
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER' S CASING DEPTH (FT) :
LOGGER' S CASING DEPTH (FT) :
BOREHOLE CONDITIONS FLUID TYPE:
FLUID DENSITY (LB/G):
SURFACE TEMPERATURE (DEGF):
BOTTOM HOLE TEMPERATURE (DEGF) :
FLUID SALINITY (PPM) :
FLUID LEVEL (FT) :
FLUID RATE AT WELLHEAD (BPM) :
WATER CUTS (PCT) :
GAS/OIL RATIO:
CHOKE (DEG) :
03-JUL-97
FSYS REV. J001 VER. 1.1
2011 03-JUL-97
18202.0
18139.0
9700.0
18118.0
1500.0
YES
TOOL NUMBER
3944XA
3927NA
2330XA
1309XA
1633EA
3927NA
1424XA
3927NA
1424PA
3927NA
3927NA
.000
18278.0
.0
S-WTR/DIESEL
.00
.0
.0
0
.0
.000
.000
.000
.0
NEUTRON TOOL
TOOL TYPE (EPITHERMAL OR THERMAL) :
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
.00
.000
BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE
TOP NORMALIZING WINDOW (FT) :
BASE NORMALIZING WINDOW (FT) :
.0
.0
BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER
FAR COUNT RATE LOW SCALE (CPS) : 0
FAR COUNT RATE HIGH SCALE (CPS): 0
NEAR COUNT RATE LOW SCALE (CPS): 0
NEAR COUNT RATE HIGH SCALE (CPS) : 0
TOOL STANDOFF (IN):
.0
REMARKS:
PASS 1 (MAIN PASS) .
$
CN
WN
FN
COUN
STAT
: BP EXPLORATION (ALASKA)
: MPL - 34
: MILNE POINT
: NORTH SLOPE
: ALASKA
* FORMAT RECORD (TYPE# 64)
ONE DEPTH PER FRAME
Tape depth ID: F
7 Curves:
Name Tool Code Samples Units
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
1 GR SBT 68 1 GAPI 4
2 CCL SBT 68 1 DIM 4
3 DEV SBT 68 1 DEG 4
4 RB SBT 68 1 DEG 4
5 SPD SBT 68 1 F/MN 4
6 TEN SBT 68 1 LBF 4
7 TTEN SBT 68 1 LBF 4
4 81 310 01 1
4 81 150 01 1
4 81 995 99 1
4 81 631 01 1
4 81 636 99 1
4 81 635 99 1
4 81 635 99 1
28
* DATA RECORD (TYPE# 0) 998 BYTES *
Total Data Records: 167
Tape File Start Depth = 18153.000000
Tape File End Depth = 16865.000000
Tape File Level Spacing = 0.250000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68 85359 datums
Tape Subfile: 5 249 records...
Minimum record length: 62 bytes
Maximum record length: 998 bytes
Tape Subfile 6 is type: LIS
FILE HEADER
FILE NLIMBER: 5
RAW CURVES
Curves and log header data for each pass in separate files; raw background
pass in last file.
PASS NUMBER: 2
DEPTH INCREMENT: .2500
FILE SUMMARY
VENDOR TOOL CODE START DEPTH
GR 9667.0
$
LOG HEADER DATA
STOP DEPTH
16954.0
DATE LOGGED:
SOFTWARE VERSION:
TIME LOGGER ON BOTTOM:
TD DRILLER (FT) :
TD LOGGER (FT) :
TOP LOG INTERVAL (FT) :
BOTTOM LOG INTERVAL (FT) :
LOGGING SPEED (FPHR) :
DEPTH CONTROL USED (YES/NO):
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
SWIV SWIVEL SUB
ROLL ROLLER SUB
CCL COLLAR LOCATOR
GR GAMMA RAY
AC ACOUSTILOG COMMON
ROLL ROLLER SUB
SBT SEGMENTED BOND TOOL
ROLL ROLLER SUB
VDL VDL SUB
ROLL ROLLER SUB
GYRO GYRO TOOL
ROLL ROLLER SUB
$
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE(IN):
DRILLER'S CASING DEPTH (FT) :
LOGGER'S CASING DEPTH (FT) :
BOREHOLE CONDITIONS FLUID TYPE:
FLUID DENSITY (LB/G):
SURFACE TEMPERATURE (DEGF):
BOTTOM HOLE TEMPERATURE (DEGF) :
FLUID SALINITY (PPM) :
FLUID LEVEL (FT) :
FLUID RATE AT WELLHEAD (BPM) :
WATER CUTS (PCT) :
GAS/OIL RATIO:
CHOKE (DEG) :
03-JUL-97
FSYS REV. J001 VER. 1.1
2023 03-JUL-97
18202.0
18139.0
9700.0
18118.0
1500.0
YES
TOOL NUMBER
3944XA
3927NA
2330XA
1309XA
1633EA
3927NA
1424XA
3927NA
1424PA
3927NA
3927NA
.000
18278.0
.0
S-WTR/DIESEL
.00
.0
.0
0
.0
.000
.000
.000
.0
NEUTRON TOOL
TOOL TYPE (EPITHERMAL OR THERMAL) :
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
.00
.000
BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE
TOP NORMALIZING WINDOW (FT) :
BASE NORMALIZING WINDOW (FT) :
.0
.0
BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER
FAR COUNT RATE LOW SCALE (CPS) : 0
FAR COUNT RATE HIGH SCALE (CPS) : 0
NEAR COUNT RATE LOW SCALE (CPS): 0
NEAR COUNT RATE HIGH SCALE (CPS): 0
TOOL STANDOFF (IN):
.0
REMARKS:
PASS 2 (GR/CCL PASS).
$
CN
WN
FN
COUN
STAT
: BP EXPLORATION (ALASKA)
: MPL - 34
: MILNE POINT
: NORTH SLOPE
: ALASKA
* FORMAT RECORD (TYPE# 64)
ONE DEPTH PER FRAME
Tape depth ID: F
7 Curves:
Name Tool Code Samples Units
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
1 GR SBT 68 1 GAPI 4
2 CCL SBT 68 1 DIM 4
3 DEV SBT 68 1 DEG 4
4 RB SBT 68 1 DEG 4
5 SPD SBT 68 1 F/MN 4
6 TEN SBT 68 1 LBF 4
7 TTEN SBT 68 1 LBF 4
4 81 310 01 1
4 81 150 01 1
4 81 995 99 1
4 81 631 01 1
4 81 636 99 1
4 81 635 99 1
4 81 635 99 1
28
* DATA RECORD (TYPE# 0) 998 BYTES *
Total Data Records: 238
Tape File Start Depth = 17005.000000
Tape File End Depth = 9650.000000
Tape File Level Spacing = 1.000000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68 68721 datums
Tape Subfile: 6 320 records...
Minimum record length: 62 bytes
Maximum record length: 998 bytes
Tape Subfile 7 is type: LIS
FILE HEADER
FILE NUMBER: 6
RAW CURVES
Curves and log header data for each pass in separate files; raw background
pass in last file.
PASS NUMBER: 3
DEPTH INCREMENT: .2500
FILE SUMMARY
VENDOR TOOL CODE START DEPTH
GR 17813.0
$
LOG HEADER DATA
STOP DEPTH
18108.0
DATE LOGGED:
SOFTWARE VERSION:
TIME LOGGER ON BOTTOM:
TD DRILLER (FT) :
TD LOGGER (FT) :
TOP LOG INTERVAL (FT) :
BOTTOM LOG INTERVAL (FT) :
LOGGING SPEED (FPHR) :
DEPTH CONTROL USED (YES/NO):
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
SWIV SWIVEL SUB
ROLL ROLLER SUB
CCL COLLAR LOCATOR
GR GAMMA RAY
AC ACOUSTILOG COMMON
ROLL ROLLER SUB
SBT SEGMENTED BOND TOOL
ROLL ROLLER SUB
VDL VDL SUB
ROLL ROLLER SUB
GYRO GYRO TOOL
ROLL ROLLER SUB
$
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE(IN):
DRILLER'S CASING DEPTH (FT) :
LOGGER'S CASING DEPTH (FT) :
BOREHOLE CONDITIONS FLUID TYPE:
FLUID DENSITY (LB/G):
SURFACE TEMPERATURE (DEGF):
BOTTOM HOLE TEMPERATURE (DEGF) :
FLUID SALINITY (PPM) :
FLUID LEVEL (FT) :
FLUID RATE AT WELLHEAD (BPM) :
WATER CUTS (PCT) :
GAS/OIL RATIO:
CHOKE (DEG) :
03-JUL-97
FSYS REV. J001 VER. 1.1
1911 03-JUL-97
18202.0
18139.0
9700.0
18118.0
1500.0
YES
TOOL NUMBER
3944XA
3927NA
2330XA
1309XA
1633EA
3927NA
1424XA
3927NA
1424PA
3927NA
3927NA
.000
18278.0
.0
S-WTR/DIESEL
.00
.0
.0
0
.0
.000
.000
.000
.0
NEUTRON TOOL
TOOL TYPE (EPITHERMAL OR THERMAL) :
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
.00
.000
BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE
TOP NORMALIZING WINDOW (FT) :
BASE NORMALIZING WINDOW (FT) :
.0
.0
BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER
FAR COUNT RATE LOW SCALE (CPS): 0
FAR COUNT RATE HIGH SCALE (CPS) : 0
NEAR COUNT RATE LOW SCALE (CPS): 0
NEAR COUNT RATE HIGH SCALE (CPS): 0
TOOL STANDOFF (IN):
.0
REMARKS:
PASS 3 (REPEAT PASS).
$
CN
WN
FN
COUN
STAT
: BP EXPLORATION (ALASKA)
: MPL - 34
: MILNE POINT
: NORTH SLOPE
: ALASKA
* FORMAT RECORD (TYPE# 64)
ONE DEPTH PER FRAME
Tape depth ID: F
7 Curves:
Name Tool Code Samples Units
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
1 GR SBT 68 1 GAPI
2 CCL SBT 68 1 DIM
3 DEV SBT 68 1 DEG
4 RB SBT 68 1 DEG
5 SPD SBT 68 1 F/MN
6 TEN SBT 68 1 LBF
7 TTEN SBT 68 1 LBF
4 81 310 01 1
4 81 150 01 1
4 81 995 99 1
4 81 631 01 1
4 81 636 99 1
4 81 635 99 1
4 81 635 99 1
28
* DATA RECORD (TYPE# 0) 998 BYTES *
Total Data Records: 46
Tape File Start Depth = 18153.000000
Tape File End Depth = 17801.000000
Tape File Level Spacing = 0.250000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68 96632 datums
Tape Subfile: 7 128 records...
Minimum record length: 62 bytes
Maximum record length: 998 bytes
Tape Subfile 8 is type: LIS
97/ 8/ 8
01
**** REEL TRAILER ****
97/ 8/ 8
01
Tape Subfile: 8 2 records...
Minimum record length: 132 bytes
Maximum record length: 132 bytes
End of execution: Fri 8 AUG 97 11:39a
Elapsed execution time = 3.74 seconds.
SYSTEM RETURN CODE = 0