Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout209-019MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission DATE:Friday, July 25, 2025 SUBJECT:Mechanical Integrity Tests TO: FROM:Kam StJohn P.I. Supervisor Petroleum Inspector NON-CONFIDENTIAL Hilcorp Alaska, LLC 4-04A DUCK IS UNIT SDI 4-04A Jim Regg InspectorSrc: Reviewed By: P.I. Suprv Comm ________ JBR 07/25/2025 4-04A 50-029-21968-01-00 209-019-0 W SPT 9811 2090190 2453 2154 2075 2109 2147 179 179 181 180 4YRTST P Kam StJohn 6/7/2025 4 Year 30 MinPretestInitial15 Min Well Name Type Test Notes: Interval P/F Well Permit Number: Type Inj TVD PTD Test psi API Well Number Inspector Name:DUCK IS UNIT SDI 4-04A Inspection Date: Tubing OA Packer Depth 1316 2747 2696 2690IA 45 Min 60 Min Rel Insp Num: Insp Num:mitKPS250607163503 BBL Pumped:2.4 BBL Returned:2.4 Friday, July 25, 2025 Page 1 of 1           MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission TO: Jim Regg DATE: Tuesday, June 22, 2021 �!� P.I. Supervisor K �l)G( 7 oT 7tV SUBJECT: Mechanical integrity Tests (( Nicorp Alaska, LLC 4-04A FROM: Bob Noble DUCK IS UNIT SDI4-04A Petroleum Inspector Sre: Inspector Reviewed By: �j P.I. Supry Jul�- NON -CONFIDENTIAL Comm Well Name DUCK IS UNIT SDI 4-04A API Well Number 50-029-21968-01-00 Inspector Name: Bob Noble Permit Number: 209-019-0 Inspection Date: 6/18/2021 Insp Num: mitRCN210619094300 Rel Insp Num: Packer Depth Pretest Initial 15 Min 30 Min 45 Min 60 Min Well 4-04A Type Inj W TVD 9811 Bing 2280 - 2285 - 2303- T2303 - PTD 2090190 - Type Test SPT- Test psi 2453 IA 1513 2690 2674 - 2674 - BBL Pumped: 1.5 BBL Returned: 1.5 - OA 250 j 250 250 250 - Interval' 4YRTST P/F P Notes: Tuesday, June 22, 2021 Page 1 of 1 STATE OF ALASKA v ALPOA OIL AND GAS CONSERVATION COMMON REPORT OF SUNDRY WELL OPERATIONS 1.Operations Abandon U Plug Perforations Li Fracture Stimulate Li Pull Tubing H Operations shutdown H Performed: Suspend ❑ Perforate ❑ Other Stimulate ❑ Alter Casing ❑ Change Approved Program ❑ Plug for Redrill ❑ erforate New Pool ❑ Repair Well ❑ Re-enter Susp Well LI Other:Convert to Injector Q 2.Operator 4.Well Class Before Work: 5.Permit to Drill Number: Name: Hilcorp Alaska LLC Development E Exploratory ❑ 209-019 3.Address: 3800 Centerpoint Dr,Suite 1400 Anchorage, Stratigraphic❑ Service ❑ 6.API Number: AK 99503 50-029-21968-01-00 7.Property Designation(Lease Number): 8.Well Name and Number: ADL0047502 DUCK IS UNIT SDI 4-04A 9.Logs(List logs and submit electronic and printed data per 20AAC25.071): 10.Field/Pool(s): N/A ENDICOTT/ ENDICOTT OIL 11.Present Well Condition Summary: Total Depth measured 12,600 feet Plugs measured 12,444 EIECEI V true vertical 10,379 feet Junk measured 10,227 feet Alt 06 2017 Effective Depth measured 12,444 feet Packer measured 8,516&12,020 feet true vertical 10,227 feet true vertical 6,765&9,811 feet AOGcc Casing Length Size MD TVD Burst Collapse Conductor 110' 30" 110' 110' N/A N/A Surface 2,500' 13-3/8" 2,500' 2,496' 5,020psi 2,260psi Intermediate 8,728' 9-5/8" 8,728' 6,879' 8,150psi 5,090psi Production 12,598' 7" 12,598' 10,377' 7,240psi 5,410psi Perforation depth Measured depth See Schematic feet SCANNED ..i�;!_.. 117 True Vertical depth See Schematic feet Tubing(size,grade,measured and true vertical depth) 4-1/2" 12.6#/13CR-80/Vam Top 12,107' 9,896' HRD ZXP Liner Top Packers and SSSV(type,measured and true vertical depth) S-3 HES HXO SVLN See Above 1,509MD/1,506TVD 12.Stimulation or cement squeeze summary: N/A Intervals treated(measured): N/A Treatment descriptions including volumes used and final pressure: N/A 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation: 0 0 0 2,200 0 Subsequent to operation: 0 0 1,000 650 943 14.Attachments(required per 20 AAC 25.070,25.071,&25.283) 15.Well Class after work: Daily Report of Well Operations CI Exploratory Development❑ Service Q Stratigraphic ❑ Copies of Logs and Surveys Run ❑ 16.Well Status after work: Oil ❑ Gas ❑ WDSPL❑ Printed and Electronic Fracture Stimulation Data ❑ GSTOR ❑ WINJ Q WAG ❑ GINJ ❑ SUSP❑ SPLUG❑ 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O.Exempt: 317-148 Authorized Name: Bo York Contact Name: Taylor Wellman , Authorized Title: Operations Manager Contact Email: twellmanahilcorp.com • Authorized Signature: ,, / Date: 6 .3‘---`. I} Contact Phone: 777-8449 , � / 7- iY 7 Form 10-404 Revised 4/2017 RBDMS V" JUL 1 2 2017 ,4 7'0,7 Submit Original Only ,13 • . Endicott Unit Well: 4-04A SCHEMATIC Last Completed: 4/27/2009 IIileorp Alaska,LLC PTD: 209-019 TREE&WELLHEAD OKB Elev.:54.7/BF Elev.:16.25 Tree 4-1/16CIW ). x ? Wellhead FMC 3c OPEN HOLE/CEMENT DETAIL I 30" 260sx Arctis Set13-3/8" 3,441 cu/ft Permafrost in a 17-1/4"Hole .: 9-5/8" 575 cu/ft Class"G"in a 12-1/4"Hole :»; r 7" 1,663 cu/ft Class"G"in a 8-1/2"Hole/Tie Back Lnr CMT @ 8,516' 13-3/8" kit 1 10 CASING DETAIL 1, it4 Size Type Wt/Grade/Conn Drift ID Top Btm BPF ti 30" Conductor N/A N/A Surface 110' N/A 0 it kt 13-3/8" Surface 68/NT-80/Butt 12.415" Surface 2,500' 0.150 21 9-5/8" Intermediate 47/NT8OHS/NSCC 8.681" Surface 8,728' 0.0732 II LI: 26/L-80/TCII 6.276" Surface 8,526' 0.0383 r. 7" Production 26/L-80/Hyd 521 6.276" 8,516' 11,352' 0.0383 26/13CR-80/Hyd 521 6.276" 11,352' 12,598' 0.0383 ,*+ 3 TUBING DETAIL 4-1/2" Tubing 12.6/13CR80/Vam Top 3.958" Surf 12,107' 0.0152 ' WELL INCLINATION DETAIL ii f y.4 Max Angle is 58 deg.@ 8,312' F5 JEWELRY DETAIL s No Depth Item 1,41 1 1,509' 4-1/2"HES HXO SVLN X-Profile(3.813"ID)w/4-1/2"MCX SSSV(5/31/17) 9-5/8" 8,728'y`I"`i35 GLM DETAIL:KBG w/ZBK Latch 8,728'to 8,735' 2 3,546' ST 5: Dev.=21,TVD=3,515',VIv=Dummy 5/12/17 (BK latch) 3 7,139' ST4: Dev.=55,TVD=6,003',VIv=Dummy 5/12/17 (BK latch) 7 4 8,493' 7"Tie Back Liner,ID=6.276" 5 8,514' 7"Tie Back Seal,10=6.23" 6 8,516' 9-5/8"x 7"HRD ZXP LTP w/Tie-Back Seal Assy&Flex Lock Liner Hanger,ID=6.23 8 7 9,762' ST 3: Dev.=28,TVD=7,605',VIv=Dummy 5/12/17 (BK latch) Ill8 11,004' ST 2: Dev.=10,TVD=8,810',VIv=Dummy 5/23/17 (BK latch) 9 9 11,911' ST 1:Port=0,Dev.=11,TVD=9,704',VIv=Dmy,6/16/2009 10 10 11,990' 4-1/2"HES X Nipple,ID=3.813" 11 12,020' 7"x 4-1/2"Baker S-3 Packer,ID=3.875" 11 12 12,054' 4-1/2"HES X Nipple,ID=3.813" 13 12,085' 4-1/2"HES XN Nipple,ID=3.725" I 12 14 12,107' 4-1/2"WLEG,ID=3.958" 15 12,454' HTT Bridge Plug 13 > ENDICOTT PERFORATION DETAIL SI g' e. Top(MD) Btm(MD) Top(TVD) Btm(TVD) FT Date Status Size R4 Tag @ $. 14 12,206 12,200' 12,224' 9,988' 10,011' 24 4/29/2009 Open 3-3/8" Y 12,255' 12,277' 10,042' 10,014' 22 4/28/2009 Open 3-3/8" q 12,289' 12,311' 10,075' 10,097' 22 4/28/2009 Open 3-3/8" x 12,332' 12,352' 10,117' 10,137' 20 4/27/2009 Open 3-3/8" 12,372' 12,392' 10,141' 10,160' 20 11/26/2015 Open 3-1/8" 12,416' 12,429' 10,199' 10,212' 13 4/28/2009 Open 3-3/8" 12,452' 12,465' 10,234' 10,247' 13 4/28/2009 Closed 3-3/8" Plugvlli7 t, 12,465' 12,485' 10,247' 10,267' 20 4/27/2009 Closed 3-3/8" Endicott Sands NOTE:Angle @ Top Perforation=11°/Ref:SLB MD Log on 3/29/2009 Cement. TOC r ±12,444 ' SAFETY NOTE GENERAL WELL INFO 15 = H2S Readings Average 230-260 PPM API:50-029-21968-01-00 »w; on A/L&Gas Injectors/Well Requires Drilled,Cased&Completed by Doyon 15 -9/20/1989 '1,; a SSSV/Chrome Tubing&Liner Sidetracked by Doyon 14-4/5/2009 '4", .4,`:,..-1'; Pull IBP-12/22/2013 7 . Set IBP-4/1/2014 TD=12,600(MD)/TD=10,379'(TVD) Sluggits-4/8/2014 PBTD=12,512'(MD)/PBTD=10,293'(TVD) Pull Sluggits and IBP-8/2/2014 Add Plug&Perforations-11/26/2015 Convert to PWI-5/31/2017 Updated By:WLR 06/05/2017 • Hilcorp Alaska, LLC Weekly Operations Summary Well Name Rig API Number Well Permit Number Start Date End Date END 4-04A Slickline 50-029-21968-00-00 209-019 5/9/17 6/17/17 Daily Operations: 5/3/2017 -Wednesday No activity to report. 5/4/2017 -Thursday No activity to report. 5/5/2017 - Friday No activity to report. 5/6/2017 -Saturday No activity to report. 5/7/2017-Sunday No activity to report. 5/8/2017 - Monday No activity to report. 5/9/2017 -Tuesday WELL S/I ON ARRIVAL, (SET PXN PLUG/GAS LIFT), PT PCE 250/2,800 PSI, RAN 4.5" GS/ BBE PRONG AND PULLED 4.5" BBE SER# HNBB-22 @ 1,491' SLM (1,509' MD). SET PLUG IN XN @ 12,071' SLM (12,085' MD) • • Hilcorp Alaska, LLC Weekly Operations Summary Well Name Rig API Number Well Permit Number Start Date End Date END 4-04A Slickline 50-029-21968-00-00 209-019 5/9/17 6/17/17 Daily Operations: 5/17/2017 -Wednesday No activity to report. 5/18/2017-Thursday No activity to report. 5/19/2017- Friday No activity to report. 5/20/2017-Saturday No activity to report. 5/21/2017-Sunday No activity to report. 5/22/2017- Monday No activity to report. 5/23/2017-Tuesday PT PCE 250-LOW/2,200-HIGH. SET 4-1/2" KEYLESS X C-SUB ON TOP OF PRONG AT 12,060' SLM. PULLED STA. #2 BEK-CIRC VALVE FROM 11,004' MD. SET STA. #2 BK-DGLV AT 11,004' MD. PERFORMED PASSING MIT-IA TO 2,500#. • Hilcorp Alaska, LLC Weekly Operations Summary Well Name Rig API Number Well Permit Number Start Date End Date END 4-04A Slickline 50-029-21968-00-00 209-019 5/9/17 6/17/17 Daily Operations: 5/24/2017-Wednesday WELL S/I ON ARRIVAL, (PULL CATCHER & PXN PLUG), PT 250/2,200 PSI. RAN 4.5" GR AND PULLED KEYLESS CATCHER @ 12,060' SLM. RAN 3.60" BELL GUIDE, 2.5" RB AND PULLED PRONG @ 12,063' SLM. 5/25/2017 -Thursday WELL S/I ON ARRIVAL, (PULL PLUG BODY, SET Al INJ VALVE), PT 200/2,200 PSI. RAN 4.5" GR (STEEL) LATCHED UP TO PLUG BODY @ 12,065' SLM (12,085' MD). UNABLE TO SHEAR TOOL OR GET TOOLS FREE. DROPPED CUTTER BAR. WIRE CUT AT ROPE SOCKET. GOT ALL THE WIRE BACK.TOOL STRING LEFT IN HOLE= 1-3/4" RS, 8' 2-1/8" STEM, 3' 2-1/8" STEM, OJ'S, KJ, LSS & QC/4.5" GR OAL=30'. 5/26/2017 - Friday No activity to report. 5/27/2017-Saturday No activity to report. 5/28/2017-Sunday (FISH CUTTER BAR &TOOL STRING), PT PCE 250/2,200. PULLED CUTTER BAR @ 12,038' SLM. RAN 3.60" BELL GUIDE, 2.5" SB (DOGLESS/BRASS) SAT DOWN ON TOP OF FISH @ 12,044' SLM,ABLE TO SHEAR SB WITH JARRING DOWN. 5/29/2017 - Monday No activity to report. 5/30/2017 -Tuesday (FISH SLICKLINE TOOL STRING), PT PCE 250/2,000 PSI. PULLED LOST TOOL STRING @ 12,044' SLM, HAD TO BLEED DOWN TUBING TO FLOW LINE PRESSURE OF 375 PSI TO ASSIST PULLING FISH. RECOVERED LOST TOOL STRING AND PX-PLUG BODY. • • Hilcorp Alaska, LLC Weekly Operations Summary Well Name Rig API Number Well Permit Number Start Date End Date END 4-04A Slickline 50-029-21968-00-00 209-019 5/9/17 6/17/17 Daily Operations: 5/31/2017-Wednesday (SET 4.5" MCX SER# M-40B 2.0" bean ), PT PCE 250/2,000. SET 4.5" MCX (SER# M-40B) W/4.5" EQ DEVICE OAL=44" IN SSSV NIPPLE @ 1,493' SLM (1,509' MD). 6/1/2017 -Thursday No activity to report. 6/2/2017 - Friday No activity to report. 6/3/2017 -Saturday No activity to report. 6/4/2017 -Sunday No activity to report. 6/5/2017- Monday No activity to report. 6/6/2017 -Tuesday No activity to report. • Hilcorp Alaska, LLC Weekly Operations Summary Well Name Rig API Number Well Permit Number Start Date End Date END 4-04A Slickline 50-029-21968-00-00 209-019 5/9/17 6/17/17 Daily Operations: 6/14/2017 -Wednesday No activity to report. 6/15/2017-Thursday No activity to report. 6/16/2017-.Friday No activity to report. 6/17/2017 -Saturday AOGCC witnessed MIT-IA passed to 2,627psi. 6/18/2017-Sunday No activity to report. 6/19/2017- Monday No activity to report. 6/20/2017 -Tuesday No activity to report. • MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission TO: DATE: Wednesday,June 28,2017 Jim Regg P.I.Supervisor 1 7(?l/7 SUBJECT: Mechanical Integrity Tests HILCORP ALASKA LLC 4-04A FROM: Jeff Jones DUCK IS UNIT SDI 4-04A Petroleum Inspector Src: Inspector Reviewed By: P.I.Supry NON-CONFIDENTIAL Comm Well Name DUCK IS UNIT SDI 4-04AAPI Well Number 50-029-21968-01-00 Inspector Name: Jeff Jones Permit Number: 209-019-0 Inspection Date: 6/17/2017 Insp Num: mitJJ170620185743 Rel Insp Num: Packer Depth Pretest Initial 15 Min 30 Min 45 Min 60 Min Well 4-04A Type Inj W -TVD 9811 ° Tubing 1100 1100 - 1100 • 1100' PTD 2090190 - Type Test SPT Test psi 2453 IA 860 2700 ' 2631 - 2627 BBL Pumped: 2.8 BBL Returned: 2.4 OA 0 0 - 0 0 Interval INITAL P/F P Notes' Producer converted to injector,initial test. 1 well inspected,no exceptions noted. SCANNED AUG 1 5 201 Wednesday,June 28,2017 Page 1 of 1 • but 4 ;4a z®l 0 Igo Regg, James B (DOA) From: Wyatt Rivard <wrivard@hilcorp.com> 6714,7 Sent: Monday,June 5, 2017 11:47 AM `2efe To: Wallace, Chris D (DOA); Brooks, Phoebe L (DOA); Regg,James (DOA); DOA AOGCC Prudhoe Bay Cc: Taylor Wellman; Alaska NS - Endicott - Operations Leads; Larry McBride; Kendal Vassen Subject: END 4-04A (PTD # 2090190) Ready For Injection Attachments: MIT DIU SDI 4-04A 6-3-17.xlsx; END 4-04A Directional Survey 6-5-17.txt; END 4-04A SCHEMATIC 06-05-2017.doc All, Endicott well 4-04A(PTD#2090190) was recently converted to water injection per sundry#317-148.The well had a passing witness-waived pre injection MIT-IA on 6/3/17. Please see attached MIT form, deviation survey and wellbore schematic.The well is ready to put on injection for stabilization and compliance testing. Plan Forward—Operations 1) Place well on injection. Use caution, annuli are fluid packed. 2) AOGCC MIT-IA when well is on injection and thermally stable. Thank You, Wyatt Rivard Well Integrity Engineer 11 lilcorp Alaska, LLC 0 (907) 777-8547 ( C: (509)670-8001 ( wrivardPhilcorp.com 3800 Centrerpoint Drive,Suite 1400 ( Anchorage,AK 99503 SCANNED JUL. 1 42'017, • • STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION Mechanical Integrity Test Submit to: jim.reggC5ialaska.ciov- AOGCC.Inspectors(@alaska.dov phoebe.brooks(talaska.5ov chris.wallacenalaska.00v OPERATOR: Hilcorp % FIELD/UNIT/PAD: Endicott/DIU/SDI / l 1 6 jf 1-7 r DATE: 06/03/17 OPERATOR REP: Kendal Vassen AOGCC REP: Well 4-04A Pressures: Pretest Initial 15 Min. 30 Min. 45 Min. 60 Min. PTD 2090190f Type Inj N Tubing 1050 1050 1050 1050 Type Test P Packer TVD 9811 ' BBL Pump 0.7 . IA 2071 • 2660 - 2639 ' 2636 - Interval 0 Test psi 2453 - BBL Return 0.7 - OA 180 180 180 180 Result P -' •'��' Notes: Newly converted well,pre Injection MIT-IA to 2500 psi per sundry 317-148.Witness waived by Chuck Scheve. �f;3� �,, u���� Well Pressures: Pretest Initial 15 Min. 30 Min. 45 Min. 60 Min. o 'k1;ed- PTD Type Inj Tubing Type Test , y,l Packer TVD BBL Pump IA Interval b rt f.tea- Test psi BBL Return OA C��/,, Result J °,Ci.�J41 Notes: Well Pressures: Pretest Initial 15 Min. 30 Min. 45 Min. 60 Min. PTD Type Inj Tubing Type Test Packer TVD BBL Pump IA Interval Test psi BBL Return OA Result Notes: Well Pressures: Pretest Initial 15 Min. 30 Min. 45 Min. 60 Min. PTD Type Inj Tubing Type Test Packer TVD BBL Pump IA Interval Test psi BBL Return OA Result Notes: Well Pressures: Pretest Initial 15 Min. 30 Min. 45 Min. 60 Min. PTD Type Inj Tubing Type Test Packer TVD BBL Pump IA Interval Test psi BBL Return OA Result Notes: Well Pressures: Pretest Initial 15 Min. 30 Min. 45 Min. 60 Min. PTD Type Inj Tubing Type Test Packer TVD BBL Pump IA Interval Test psi BBL Return OA Result Notes: Well Pressures: Pretest Initial 15 Min. 30 Min. 45 Min. 60 Min. PTD Type Inj Tubing Type Test Packer TVD BBL Pump IA Interval Test psi BBL Return OA Result Notes: Well Pressures: Pretest Initial 15 Min. 30 Min. 45 Min. 60 Min. PTD Type Inj Tubing Type Test Packer TVD BBL Pump IA Interval Test psi BBL Return OA Result Notes: TYPE INJ Codes TYPE TEST Codes INTERVAL Codes Result Codes W=Water P=Pressure Test I=Initial Test P=Pass G=Gas O=Other(describe in Notes) 4=Four Year Cycle F=Fail S=Slurry V=Required by Variance I=Inconclusive I=Industrial Wastewater 0=Other(describe in notes) N=Not Injecting Form 10-426(Revised 01/2017) MIT DIU SDI 4-04A 6-3-17 H . • Endicott Unit Well: 4-04A SCHEMATIC Last Completed: 4/27/2009 flacon)Alaska,Ilk PTD209-019 TREE&WELLHEAD 0KB Elev.:54.7'/BF Elev.:16.25 Tree 4-1/16CIW 4 N C + 14 Wellhead FMC 30" OPEN HOLE/CEMENT DETAIL 30" 260sx Arctis Set CI 13-3/8" 3,441 cu/ft Permafrost in a 17-1/4"Hole 1 n 9-5/8" 575 cu/ft Class"G"in a 12-1/4"Hole t ,,.! A 7" 1,663 cu/ft Class"G"in a 8-1/2"Hole/Tie Back Lnr CMT @ 8,516' 13-3/8" CASING DETAIL i, Size Type Wt/Grade/Conn Drift ID Top Btm BPF 30" Conductor N/A N/A Surface 110' N/A 13 3/8" Surface 68/NT-80/Butt 12.415" Surface 2,500' 0.150 is 2 ,44,4 9-5/8" Intermediate 47/NT8OHS/NSCC 8.681" Surface 8,728' 0.0732 26/L-80/TCII 6.276" Surface 8,526' 0.0383 7" Production 26/L-80/Hyd 521 6.276" 8,516' 11,352' 0.0383 26/13CR-80/Hyd 521 6.276" 11,352' 12,598' 0.0383 3 >wr TUBING DETAIL 4-1/2" Tubing 12.6/13CR80/Vam Top 3.958" Surf 12,107' 0.0152 WELL INCLINATION DETAIL 104 I I 0 4 Max Angle is 58 deg.@ 8,312' 1s JEWELRY DETAIL 4 No Depth Item 1 1,509' 4-1/2"HES HXO SVLN X-Profile(3.813"ID)w/4-1/2"MCX SSSV(5/31/17) 9-5/8" Mout o GLM DETAIL: KBG w/ZBK Latch 8,728't8,735735 2 3,546' ST 5: Dev.=21,TVD=3,515',VIv=Dummy 5/12/17 (BK latch) 3 7,139' ST 4: Dev.=55,TVD=6,003',VIv=Dummy 5/12/17 (BK latch) 7 4 8,493' 7"Tie Back Liner,ID=6.276" 5 8,514' 7"Tie Back Seal,ID=6.23" 6 8,516' 9-5/8"x 7"HRD ZXP LTP w/Tie-Back Seal Assy&Flex Lock Liner Hanger,ID=6.23 8 7 9,762' ST 3: Dev.=28,TVD=7,605',VIv=Dummy 5/12/17 (BK latch) 8 11,004' ST 2: Dev.=10,TVD=8,810',VIv=Dummy 5/23/17 (BK latch) 9 9 11,911' ST 1:Port=0,Dev.=11,TVD=9,704',VIv=Dmy,6/16/2009 `10il 10 11,990' 4-1/2"HES X Nipple,ID=3.813" 11 12,020' 7"x 4-1/2"Baker S-3 Packer,ID=3.875" 11 12 12,054' 4-1/2"HES X Nipple,ID=3.813" 13 12,085' 4-1/2"HES XN Nipple,ID=3.725" 12 14 12,107' 4-1/2"WLEG,ID=3.958" 15 12,454' WIT Bridge Plug /11 w s 13 =` ENDICOTT PERFORATION DETAIL RA Tag@ P 14Top(MD) Btm(MD) Top(TVD) Btm(TVD) FT Date Status Size 12,205 i � � 12,200' 12,224' 9,988' 10,011' 24 4/29/2009 Open 3-3/8" 12,255' 12,277' 10,042' 10,014' 22 4/28/2009 Open 3-3/8" 12,289' 12,311' 10,075' 10,097' 22 4/28/2009 Open 3-3/8" y 12,332' 12,352' 10,117' 10,137' 20 4/27/2009 Open 3-3/8" -I; 12,372' 12,392' 10,141' 10,160' 20 11/26/2015 Open 3-1/8" 12,416' 12,429' 10,199' 10,212' 13 4/28/2009 Open 3-3/8" 12,452' 12,465' 10,234' 10,247' 13 4/28/2009 Closed 3-3/8" 44 1 12,465' 12,485' 10,247' 10,267' 20 4/27/2009 Closed 3-3/8" Plug w'10 Endicott Sands NOTE:Angle TopPerforation=11° Ref:SLB MD Logon 3/29/2009 Cement. TOC g @ / t 12,444' 3 v SAFETY NOTE GENERAL WELL INFO AA. 15 s. H2S Readings Average 230-260 PPM API:50-029-21968-01-00 .& on A/L&Gas Injectors/Well Requires Drilled,Cased&Completed by Doyon 15 -9/20/1989 .„ a SSSV/Chrome Tubing&Liner Sidetracked by Doyon 14-4/5/2009 7)_ C, 1. Pull IBP-12/22/2013 Set IBP-4/1/2014 TD=12,600(MD)/TD=10,379'(TVD) Sluggits-4/8/2014 PBTD=12,512'(MD)/PBTD=10,293'(TVD) Pull Sluggits and IBP-8/2/2014 Add Plug&Perforations-11/26/2015 Convert to PWI-5/31/2017 Updated By:WLR 06/05/2017 III • END 4-04A Directional Survey 6-5-17 *WELL 500292196801 (F-tZoo lgo) *XYUNITS F / *DEPUNITS F *COLUMNS *MD *TVD *EW *NS *INC *AZM 0.00 0.00 0.00 0.00 0.000 0.000 36.40 36.40 -0.16 -0.12 0.620 232.890 47.00 47.00 -0.23 -0.18 0.400 217.310 57.60 57.60 -0.26 -0.24 0.370 209.350 68.20 68.20 -0.30 -0.31 0.420 207.990 78.80 78.80 -0.34 -0.38 0.470 208.470 87.70 87.70 -0.37 -0.44 0.500 208.980 94.00 94.00 -0.40 -0.49 0.530 209.470 108.80 108.80 -0.47 -0.62 0.580 210.350 122.70 122.70 -0.54 -0.74 0.580 208.670 136.65 136.65 -0.61 -0.86 0.570 206.680 150.65 150.64 -0.67 -0.98 0.520 207.900 164.75 164.74 -0.72 -1.08 0.420 209.000 178.75 178.74 -0.77 -1.17 0.350 207.260 192.90 192.89 -0.80 -1.24 0.320 203.910 207.05 207.04 -0.83 -1.31 0.270 199.120 221.15 221.14 -0.85 -1.37 0.230 195.480 235.30 235.29 -0.86 -1.42 0.200 192.490 249.50 249.49 -0.87 -1.47 0.180 189.510 263.70 263.69 -0.88 -1.51 0.180 190.090 277.90 277.89 -0.89 -1.55 0.180 191.020 292.10 292.09 -0.90 -1.60 0.170 190.200 306.40 306.39 -0.90 -1.64 0.150 189.450 320.70 320.69 -0.91 -1.67 0.120 190.840 335.00 334.99 -0.91 -1.70 0.100 195.290 349.25 349.24 -0.92 -1.72 0.080 200.030 363.45 363.44 -0.93 -1.73 0.050 238.080 377.65 377.64 -0.94 -1.73 0.030 293.920 391.75 391.74 -0.95 -1.73 0.050 304.810 405.75 405.74 -0.96 -1.72 0.070 294.860 419.65 419.64 -0.97 -1.70 0.130 347.790 433.65 433.64 -0.94 -1.65 0.380 42.260 447.70 447.69 -0.85 -1.55 0.780 41.890 461.75 461.74 -0.70 -1.37 1.080 40.330 475.90 475.89 -0.52 -1.17 1.130 41.590 489.95 489.94 -0.34 -0.98 0.930 46.300 504.10 504.08 -0.19 -0.88 0.620 67.730 518.20 518.18 -0.05 -0.88 0.600 113.620 532.25 532.23 0.08 -1.01 1.050 147.290 546.30 546.28 0.23 -1.31 1.620 158.080 560.20 560.17 0.37 -1.75 2.220 165.250 574.15 574.11 0.49 -2.34 2.770 171.520 588.15 588.09 0.56 -3.08 3.280 176.280 602.25 602.16 0.60 -3.93 3.680 179.020 Page 1 • III END 4-04A Directional Survey 6-5-17 616.35 616.23 0.60 -4.89 4.070 181.080 630.45 630.29 0.56 -5.94 4.480 182.730 644.55 644.34 0.50 -7.07 4.750 183.450 658.65 658.39 0.42 -8.25 4.880 184.240 672.75 672.44 0.32 -9.46 5.000 185.180 686.85 686.49 0.20 -10.69 5.070 185.890 700.95 700.53 0.07 -11.94 5.150 186.290 715.05 714.57 -0.07 -13.21 5.230 186.340 729.10 728.56 -0.21 -14.49 5.270 186.340 743.20 742.60 -0.36 -15.77 5.280 186.260 757.30 756.65 -0.50 -17.06 5.280 186.100 771.40 770.69 -0.63 -18.36 5.280 186.040 785.50 784.73 -0.77 -19.64 5.230 186.060 799.60 798.77 -0.91 -20.91 5.180 186.080 813.70 812.81 -1.04 -22.17 5.080 185.920 827.80 826.86 -1.16 -23.40 5.000 185.680 841.90 840.90 -1.28 -24.61 4.930 185.420 856.00 854.95 -1.39 -25.81 4.900 185.250 870.10 869.00 -1.50 -27.01 4.880 185.200 884.25 883.10 -1.61 -28.20 4.820 184.880 898.35 897.15 -1.71 -29.38 4.800 184.660 912.45 911.20 -1.80 -30.56 4.800 184.550 926.55 925.25 -1.89 -31.74 4.820 184.380 940.70 939.35 -1.98 -32.92 4.820 184.350 954.85 953.45 -2.07 -34.11 4.830 184.290 968.95 967.50 -2.16 -35.29 4.830 184.200 983.05 981.55 -2.25 -36.48 4.850 184.290 997.05 995.50 -2.34 -37.66 4.880 184.360 1011.00 1009.40 -2.43 -38.85 4.880 184.340 1025.10 1023.45 -2.52 -40.04 4.880 184.390 1039.20 1037.50 -2.61 -41.24 4.920 184.410 1053.40 1051.64 -2.70 -42.46 4.930 184.380 1067.55 1065.74 -2.80 -43.67 4.950 184.350 1081.70 1079.84 -2.89 -44.89 4.950 184.100 1095.85 1093.94 -2.97 -46.11 4.950 184.040 1110.05 1108.08 -3.06 -47.33 4.950 184.200 1124.20 1122.18 -3.15 -48.55 4.970 184.070 1138.35 1136.28 -3.24 -49.78 4.980 183.920 1152.55 1150.42 -3.32 -51.01 4.980 183.910 1166.65 1164.47 -3.40 -52.22 4.950 184.010 1180.85 1178.62 -3.49 -53.44 4.930 184.070 1195.00 1192.72 -3.57 -54.65 4.880 183.860 1209.10 1206.77 -3.65 -55.85 4.870 183.670 1223.10 1220.71 -3.73 -57.03 4.850 183.700 1237.00 1234.57 -3.80 -58.20 4.830 183.600 1251.00 1248.52 -3.88 -59.37 4.800 183.380 1264.90 1262.37 -3.95 -60.53 4.780 183.620 1278.90 1276.32 -4.02 -61.70 4.820 184.000 Page 2 • ! END 4-04A Directional Survey 6-5-17 1292.90 1290.27 -4.11 -62.88 4.850 184.050 1306.85 1304.17 -4.19 -64.05 4.830 183.900 1320.80 1318.07 -4.27 -65.22 4.830 183.640 1334.75 1331.97 -4.34 -66.39 4.800 183.430 1348.75 1345.92 -4.41 -67.56 4.770 183.260 1362.65 1359.77 -4.47 -68.71 4.730 183.060 1376.65 1373.73 -4.53 -69.85 4.680 182.850 1390.65 1387.68 -4.58 -70.99 4.650 182.450 1404.60 1401.58 -4.63 -72.12 4.650 182.120 1418.55 1415.49 -4.67 -73.25 4.630 182.130 1432.45 1429.34 -4.71 -74.37 4.620 182.100 1446.25 1443.10 -4.75 -75.48 4.620 182.000 1460.10 1456.90 -4.79 -76.59 4.600 181.980 1474.00 1470.76 -4.83 -77.70 4.580 181.850 1488.00 1484.71 -4.86 -78.82 4.570 181.710 1501.90 1498.57 -4.89 -79.92 4.520 181.610 1515.90 1512.53 -4.92 -81.02 4.470 181.430 1529.85 1526.44 -4.94 -82.09 4.350 181.070 1543.85 1540.40 -4.96 -83.14 4.230 180.430 1557.80 1554.31 -4.96 -84.16 4.150 180.300 1571.75 1568.22 -4.97 -85.15 3.980 180.750 1585.75 1582.19 -4.99 -86.10 3.800 181.350 1599.65 1596.06 -5.02 -87.00 3.670 182.220 1613.60 1609.99 -5.06 -87.87 3.450 182.790 1627.55 1623.91 -5.10 -88.68 3.270 183.170 1641.50 1637.84 -5.15 -89.46 3.150 183.810 1655.50 1651.82 -5.20 -90.21 3.020 184.520 1669.40 1665.70 -5.26 -90.93 2.900 185.350 1683.40 1679.68 -5.33 -91.61 2.730 186.390 1697.40 1693.67 -5.41 -92.25 2.550 187.680 1711.40 1707.66 -5.50 -92.85 2.430 189.060 1725.35 1721.59 -5.60 -93.42 2.300 190.120 1739.30 1735.53 -5.69 -93.95 2.130 190.720 1753.30 1749.52 -5.79 -94.45 2.030 191.130 1767.25 1763.47 -5.88 -94.92 1.930 191.540 1781.25 1777.46 -5.97 -95.37 1.830 191.120 1795.25 1791.45 -6.06 -95.81 1.800 190.330 1809.25 1805.44 -6.13 -96.24 1.780 190.130 1823.25 1819.44 -6.21 -96.66 1.750 189.810 1837.25 1833.43 -6.28 -97.08 1.700 189.380 1851.25 1847.43 -6.35 -97.48 1.630 189.300 1865.20 1861.37 -6.41 -97.87 1.570 189.160 1879.05 1875.22 -6.47 -98.23 1.520 189.070 1892.90 1889.06 -6.52 -98.59 1.450 189.200 1906.80 1902.96 -6.58 -98.93 1.380 189.010 1920.80 1916.95 -6.63 -99.25 1.330 188.860 1934.80 1930.95 -6.68 -99.57 1.250 188.740 1948.90 1945.05 -6.72 -99.85 1.120 189.000 Page 3 • S END 4-04A Directional Survey 6-5-17 1962.90 1959.04 -6.76 -100.11 0.970 189.320 1976.95 1973.09 -6.80 -100.33 0.900 189.090 1990.95 1987.09 -6.83 -100.55 0.920 188.580 2005.00 2001.14 -6.87 -100.78 0.930 188.090 2019.00 2015.14 -6.90 -101.00 0.950 187.910 2032.80 2028.93 -6.93 -101.23 0.970 187.680 2046.65 2042.78 -6.96 -101.47 1.000 187.250 2060.45 2056.58 -6.99 -101.71 1.000 187.100 2074.35 2070.48 -7.02 -101.95 0.970 187.240 2088.15 2084.28 -7.05 -102.17 0.900 187.510 2101.95 2098.07 -7.08 -102.38 0.850 187.450 2115.85 2111.97 -7.10 -102.58 0.850 187.080 2129.65 2125.77 -7.13 -102.78 0.800 187.200 2143.50 2139.62 -7.15 -102.97 0.770 187.280 2157.30 2153.42 -7.18 -103.15 0.730 188.090 2171.10 2167.22 -7.20 -103.31 0.630 189.680 2185.00 2181.12 -7.23 -103.45 0.530 191.680 2198.80 2194.92 -7.25 -103.56 0.450 194.090 2212.70 2208.82 -7.28 -103.66 0.420 196.290 2226.50 2222.62 -7.31 -103.76 0.400 197.090 2240.30 2236.42 -7.34 -103.85 0.380 196.690 2254.20 2250.32 -7.36 -103.94 0.380 189.920 2268.00 2264.12 -7.37 -104.03 0.420 182.620 2281.85 2277.97 -7.37 -104.13 0.420 182.490 2295.65 2291.76 -7.38 -104.23 0.400 183.410 2309.35 2305.46 -7.38 -104.33 0.430 183.260 2323.05 2319.16 -7.40 -104.44 0.480 189.150 2336.75 2332.86 -7.42 -104.55 0.500 196.860 2350.60 2346.71 -7.46 -104.67 0.480 198.220 2364.40 2360.51 -7.49 -104.78 0.470 197.310 2378.20 2374.31 -7.53 -104.88 0.470 196.290 2392.00 2388.11 -7.56 -104.99 0.450 196.060 2405.85 2401.96 -7.58 -105.10 0.450 194.240 2419.65 2415.76 -7.61 -105.20 0.430 190.190 2433.55 2429.66 -7.62 -105.30 0.430 185.110 2447.35 2443.46 -7.63 -105.41 0.430 181.910 2461.15 2457.26 -7.63 -105.51 0.430 180.690 2475.05 2471.16 -7.63 -105.61 0.400 182.580 2488.85 2484.96 -7.64 -105.70 0.370 185.890 2502.70 2498.81 -7.65 -105.79 0.350 184.940 2516.60 2512.71 -7.65 -105.87 0.330 184.180 2530.40 2526.51 -7.66 -105.95 0.350 187.750 2544.30 2540.41 -7.68 -106.04 0.380 189.870 2558.10 2554.21 -7.69 -106.14 0.430 189.690 2571.95 2568.06 -7.72 -106.24 0.430 202.360 2585.80 2581.91 -7.79 -106.32 0.500 230.460 2599.70 2595.81 -7.92 -106.38 0.720 254.170 2613.50 2609.60 -8.13 -106.41 1.030 267.270 Page 4 i • END 4-04A Directional Survey 6-5-17 2627.40 2623.50 -8.42 -106.40 1.430 276.810 2641.20 2637.30 -8.81 -106.32 1.870 284.370 2655.00 2651.09 -9.30 -106.17 2.380 290.660 2668.90 2664.97 -9.88 -105.91 2.900 296.600 2682.80 2678.85 -10.55 -105.54 3.400 300.740 2696.65 2692.67 -11.29 -105.08 3.800 303.420 2710.50 2706.49 -12.09 -104.55 4.150 303.710 2724.35 2720.30 -12.96 -103.99 4.430 301.080 2738.15 2734.06 -13.92 -103.43 4.770 299.690 2751.90 2747.75 -14.95 -102.84 5.180 299.530 2765.65 2761.44 -16.07 -102.21 5.550 299.550 2779.45 2775.18 -17.26 -101.54 5.830 299.410 2793.35 2789.00 -18.51 -100.81 6.100 300.940 2807.25 2802.82 -19.78 -100.00 6.370 304.260 2821.15 2816.63 -21.06 -99.08 6.630 307.310 2834.95 2830.33 -22.35 -98.06 7.020 309.170 2848.60 2843.87 -23.66 -96.98 7.330 309.530 2862.30 2857.46 -25.02 -95.85 7.470 310.330 2876.00 2871.04 -26.37 -94.66 7.600 312.160 2889.65 2884.57 -27.71 -93.39 7.920 314.670 2903.35 2898.13 -29.05 -92.00 8.320 317.470 2917.10 2911.73 -30.40 -90.48 8.700 319.350 2930.70 2925.17 -31.75 -88.87 9.050 320.450 2944.40 2938.69 -33.12 -87.16 9.380 321.980 2958.10 2952.20 -34.49 -85.35 9.700 323.790 2971.70 2965.60 -35.85 -83.47 9.970 324.560 2985.40 2979.09 -37.26 -81.53 10.200 323.290 2999.10 2992.57 -38.77 -79.59 10.480 321.120 3012.70 3005.93 -40.37 -77.65 10.830 320.000 3026.40 3019.38 -42.05 -75.64 11.200 319.780 3040.00 3032.71 -43.79 -73.60 11.500 319.550 3053.65 3046.08 -45.59 -71.50 11.900 319.200 3067.30 3059.43 -47.46 -69.35 12.250 318.940 3080.95 3072.76 -49.39 -67.15 12.500 318.530 3094.60 3086.08 -51.38 -64.91 12.850 318.050 3108.25 3099.37 -53.44 -62.62 13.250 318.110 3121.85 3112.60 -55.55 -60.24 13.730 318.770 3135.45 3125.80 -57.70 -57.77 14.180 319.210 3149.10 3139.02 -59.92 -55.20 14.600 319.170 3162.70 3152.16 -62.20 -52.56 15.170 319.120 3178.10 3167.00 -64.90 -49.44 15.870 319.130 3218.65 3205.87 -72.49 -40.74 17.220 318.670 3261.35 3246.53 -81.20 -31.05 18.330 317.460 3304.00 3286.92 -90.72 -21.19 19.180 314.620 3346.80 3327.33 -101.13 -11.66 19.330 310.350 3389.60 3367.75 -112.16 -2.94 19.050 306.280 3432.40 3408.19 -123.68 5.03 19.180 303.040 3475.15 3448.49 -135.82 12.51 19.800 300.350 Page 5 • III END 4-04A Directional Survey 6-5-17 3517.95 3488.66 -148.73 19.68 20.570 297.800 3560.75 3528.61 -162.42 26.66 21.530 296.260 3603.55 3568.28 -176.87 33.68 22.550 295.520 3646.10 3607.44 -191.93 40.73 23.480 294.690 3688.20 3645.93 -207.49 47.73 24.330 293.790 3730.40 3684.26 -223.68 54.76 25.120 293.110 3772.50 3722.26 -240.42 61.71 25.870 292.040 3814.60 3760.03 -257.76 68.45 26.600 290.440 3856.70 3797.57 -275.70 74.84 27.200 288.790 3898.70 3834.89 -294.07 80.68 27.450 286.520 3940.85 3872.24 -312.89 85.86 27.720 284.260 3982.95 3909.38 -332.15 90.56 28.480 283.180 4025.00 3946.13 -352.06 95.17 29.680 282.880 4067.20 3982.55 -372.84 99.90 30.980 282.760 4109.35 4018.44 -394.41 104.78 32.300 282.760 4151.55 4053.85 -416.79 109.87 33.620 282.850 4193.75 4088.72 -439.96 115.18 34.930 282.990 4235.95 4123.03 -463.88 120.74 36.270 283.150 4278.25 4156.83 -488.63 126.57 37.630 283.370 4320.50 4189.99 -514.10 132.69 38.980 283.650 4362.90 4222.64 -540.37 139.14 40.300 283.930 4405.25 4254.64 -567.27 145.89 41.530 284.260 4447.15 4285.70 -594.51 152.88 42.800 284.520 4488.65 4315.80 -622.15 160.09 44.180 284.710 4529.90 4345.04 -650.28 167.52 45.550 284.870 4571.10 4373.54 -679.03 175.19 46.920 285.000 4612.55 4401.46 -708.60 183.16 48.380 285.180 4654.10 4428.68 -738.89 191.44 49.770 285.380 4695.60 4455.18 -769.66 199.94 50.830 285.510 4737.10 4481.15 -800.85 208.63 51.720 285.630 4778.50 4506.62 -832.26 217.47 52.320 285.790 4820.00 4531.98 -863.86 226.45 52.350 285.960 4861.50 4557.35 -895.43 235.52 52.300 286.080 4903.05 4582.80 -926.99 244.63 52.150 286.120 4944.60 4608.36 -958.46 253.73 51.920 286.150 4986.25 4634.07 -989.93 262.86 51.850 286.220 5027.85 4659.84 -1021.27 272.02 51.570 286.360 5069.50 4685.82 -1052.49 281.24 51.250 286.520 5111.15 4711.95 -1083.58 290.48 51.030 286.600 5152.65 4738.13 -1114.43 299.69 50.750 286.650 5194.35 4764.61 -1145.29 308.94 50.430 286.710 5235.45 4790.86 -1175.58 318.05 50.170 286.770 5276.45 4817.17 -1205.68 327.14 49.980 286.840 5317.35 4843.54 -1235.60 336.20 49.720 286.860 5358.30 4870.12 -1265.42 345.24 49.370 286.880 5399.20 4896.83 -1295.04 354.27 49.050 287.020 5440.10 4923.77 -1324.46 363.31 48.580 287.150 5481.00 4950.85 -1353.74 372.35 48.480 287.150 Page 6 III • END 4-04A Directional Survey 6-5-17 5522.00 4977.95 -1383.14 381.42 48.770 287.140 5562.90 5004.95 -1412.50 390.47 48.620 287.110 5603.80 5032.09 -1441.75 399.46 48.250 287.060 5644.80 5059.45 -1470.95 408.40 48.020 287.010 5685.80 5086.91 -1500.07 417.29 47.870 286.930 5726.90 5114.51 -1529.21 426.15 47.770 286.890 5767.90 5142.10 -1558.22 434.95 47.620 286.880 5808.80 5169.71 -1587.10 443.71 47.470 286.870 5849.50 5197.28 -1615.75 452.39 47.250 286.830 5890.20 5224.96 -1644.32 461.02 47.050 286.770 5931.15 5252.89 -1672.99 469.65 46.930 286.740 5972.30 5280.96 -1701.80 478.33 47.050 286.780 6012.80 5308.46 -1730.26 486.93 47.420 286.860 6053.40 5335.81 -1758.97 495.66 47.900 286.960 6093.90 5362.87 -1787.78 504.49 48.250 287.120 6134.45 5389.78 -1816.76 513.46 48.600 287.290 6175.65 5416.93 -1846.33 522.71 48.930 287.430 6218.90 5445.31 -1877.47 532.49 49.050 287.470 6262.20 5473.66 -1908.70 542.31 49.180 287.420 6305.45 5501.89 -1939.97 552.10 49.330 287.360 6348.70 5529.94 -1971.38 561.92 49.780 287.360 6392.05 5557.75 -2003.12 571.85 50.400 287.390 6435.35 5585.22 -2035.06 581.87 50.880 287.440 6478.65 5612.44 -2067.18 591.97 51.200 287.490 6522.05 5639.53 -2099.52 602.17 51.570 287.520 6565.45 5666.35 -2132.05 612.45 52.080 287.540 6608.75 5692.84 -2164.71 622.78 52.500 287.570 6652.15 5719.13 -2197.63 633.21 52.920 287.570 6695.55 5745.20 -2230.71 643.67 53.230 287.520 6738.65 5770.89 -2263.72 654.06 53.600 287.450 6781.30 5796.08 -2296.56 664.37 54.000 287.390 6824.05 5821.16 -2329.60 674.69 54.170 287.320 6866.85 5846.22 -2362.73 685.02 54.150 287.290 6909.65 5871.20 -2395.91 695.36 54.430 287.340 6952.45 5895.99 -2429.20 705.78 54.770 287.410 6995.25 5920.63 -2462.60 716.26 54.950 287.450 7038.10 5945.18 -2496.10 726.78 55.120 287.430 7080.95 5969.70 -2529.64 737.28 55.080 287.310 7123.70 5994.12 -2563.14 747.68 55.230 287.200 7166.35 6018.34 -2596.69 758.04 55.580 287.120 7208.95 6042.38 -2630.31 768.37 55.700 287.030 7251.50 6066.38 -2663.91 778.64 55.630 286.960 7294.35 6090.57 -2697.74 788.94 55.630 286.920 7337.45 6114.94 -2731.76 799.27 55.530 286.850 7380.55 6139.37 -2765.75 809.53 55.400 286.760 7423.75 6163.82 -2799.86 819.79 55.670 286.700 7466.85 6188.03 -2834.02 830.03 55.980 286.680 7509.30 6211.78 -2867.72 840.12 55.980 286.650 Page 7 . • 4 END 4-04A Directional Survey 6-5-17 7551.80 6235.51 -2901.51 850.20 56.120 286.580 7594.20 6259.14 -2935.25 860.21 56.130 286.480 7636.65 6282.81 -2969.05 870.20 56.100 286.430 7679.05 6306.51 -3002.78 880.14 55.950 286.420 7721.40 6330.28 -3036.39 890.06 55.750 286.460 7763.70 6354.06 -3069.93 900.00 55.850 286.570 7806.04 6377.78 -3103.54 910.03 55.980 286.650 7848.40 6401.48 -3137.18 920.09 56.000 286.660 7890.70 6425.11 -3170.79 930.15 56.070 286.660 7933.05 6448.70 -3204.49 940.21 56.220 286.600 7975.45 6472.25 -3238.29 950.25 56.320 286.480 8017.90 6495.77 -3272.18 960.27 56.370 286.450 8060.30 6519.28 -3306.02 970.27 56.300 286.480 8102.70 6542.77 -3339.86 980.30 56.400 286.540 8145.10 6566.10 -3373.79 990.41 56.820 286.640 8187.45 6589.20 -3407.79 1000.61 57.070 286.750 8229.10 6611.80 -3441.28 1010.71 57.220 286.840 8270.39 6634.04 -3474.57 1020.82 57.600 286.920 8311.70 6656.06 -3508.00 1031.00 57.970 286.970 8352.95 6677.98 -3541.42 1041.20 57.830 286.980 8394.25 6700.04 -3574.82 1051.39 57.600 286.940 8435.55 6722.12 -3608.21 1061.57 57.770 286.960 8476.85 6744.11 -3641.64 1071.77 57.880 286.990 8518.14 6766.07 -3675.08 1082.01 57.870 287.050 8559.45 6788.10 -3708.49 1092.26 57.680 287.080 8600.70 6810.23 -3741.76 1102.49 57.420 287.100 8642.05 6832.52 -3775.04 1112.75 57.350 287.170 8683.50 6854.86 -3808.40 1123.07 57.420 287.190 8724.95 6877.27 -3841.71 1133.37 57.120 287.180 8728.00 6878.93 -3844.16 1134.12 57.090 287.180 8782.02 6908.43 -3887.67 1146.55 56.720 284.690 8877.43 6962.95 -3964.07 1163.53 53.590 280.290 8972.63 7020.83 -4038.86 1174.22 51.540 275.910 9068.05 7080.74 -4112.96 1179.04 50.710 271.510 9161.57 7141.11 -4184.36 1178.27 48.900 267.200 9255.76 7204.46 -4253.88 1173.46 46.570 264.840 9351.81 7272.76 -4321.08 1167.03 42.760 264.200 9445.51 7343.42 -4382.26 1160.59 39.320 263.770 9538.36 7416.73 -4438.92 1154.74 36.380 264.460 9634.95 7496.02 -4493.88 1150.37 33.260 266.530 9729.91 7577.23 -4542.96 1147.28 29.130 266.250 9823.28 7660.12 -4585.83 1144.60 25.660 266.630 9917.61 7745.85 -4625.11 1142.61 23.630 267.610 10012.23 7833.61 -4660.36 1140.16 20.240 264.180 10105.61 7921.91 -4690.61 1137.59 17.720 266.250 10198.40 8011.10 -4716.13 1136.59 14.250 269.610 10292.19 8102.65 -4736.43 1137.22 10.790 274.610 10386.88 8196.19 -4750.92 1138.97 6.970 280.460 Page 8 • r • ikAb 11,10 END 4-04A Directional Survey 6-5-17 10481.07 8290.01 -4758.90 1140.23 2.880 275.370 10576.82 8385.72 -4761.61 1140.23 0.460 234.380 10672.33 8481.19 -4759.80 1139.40 2.650 105.950 10765.48 8574.09 -4753.11 1138.80 5.690 90.200 10861.75 8669.62 -4741.30 1139.62 8.460 83.160 10956.38 8762.98 -4726.02 1141.84 10.320 80.610 11051.35 8856.41 -4709.30 1145.04 10.340 77.710 11145.77 8949.27 -4692.59 1148.60 10.510 78.220 11240.45 9042.42 -4676.05 1152.27 10.110 76.720 11335.07 9135.59 -4660.03 1156.20 9.970 75.690 11429.80 9228.96 -4644.48 1160.02 9.500 76.770 11524.49 9322.46 -4629.89 1163.41 8.700 77.060 11619.52 9416.45 -4616.24 1166.37 8.210 78.560 11712.89 9508.76 -4602.41 1168.71 9.080 82.040 11804.90 9599.52 -4587.38 1170.45 9.850 84.630 11899.84 9692.93 -4570.46 1171.13 10.720 90.560 11994.81 9786.29 -4553.00 1170.88 10.470 91.040 12088.79 9878.63 -4535.54 1170.48 10.950 91.560 12183.01 9971.09 -4517.45 1169.86 11.210 92.390 12279.03 10065.22 -4498.52 1169.11 11.550 92.170 12373.82 10158.03 -4479.22 1168.44 11.960 91.810 12468.22 10250.31 -4459.33 1167.94 12.370 91.080 12513.65 10294.67 -4449.53 1167.79 12.550 90.680 12600.00 10378.95 -4430.77 1167.56 12.550 90.680 Pa.ci- &ko = l2,O2.O-F Ti/tJ _ 7 Tv! _ 97c3c, + ( %�,��_ 77/36) (uz� 'Nets-- 1 t 2© 39 - !Loci-J Page 9 • ' y OF Tkr� • e` \\\I%%yam eA THE STATE Alaska Oil and Gas �_i_=.�,� ConseIva$ion CommissionnLAsTA _1°Ak'__ 333 West Seventh Avenue wR GOVERNOR BILL WALKER Anchorage, Alaska 99501-3572 Main: 907.279.1433 ALAS Fax: 907.276.7542 www.aogcc.alaska.gov Bo York Operations Manager Hilcorp Alaska, LLC ',pp 1 9 2.017, 3800 Centerpoint Drive, Suite 1400 (0t4t Anchorage, AK 99503 Re: Endicott Field, Endicott Oil Pool, DIU SDI 4-04A Permit to Drill Number: 209-019 Sundry Number: 317-148 Dear Mr. York: Enclosed is the approved application for sundry approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the AOGCC grants for good cause shown,a person affected by it may file with the AOGCC an application for reconsideration. A request for reconsideration is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. Sincerely, Cathy . Foerster Chair DATED this /Say of April, 2017. RBDMS t V APR 1 7 2017 • • RECEIVED APR 0 7 2011 STATE OF ALASKA 7 AOGCC ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS 20 AAC 25.280 1.Type of Request: Abandon 0 Plug Perforations ❑ Fracture Stimulate 0 Repair Well 0 Operations shutdown❑ Suspend ❑ Perforate ❑ Other Stimulate ❑ Pull Tubing ❑ Change Approved Program 0 Plug for Redrill ❑ Perforate New Pool ❑ Re-enter Susp Well ❑ Alter Casing 0 Other. Convert to Injector Q 2.Operator Name: 4.Current Well Class: 5.Permit to Drill Number. Hilcorp Alaska LLC Exploratory ❑ Development Q, 209-019 ' 3.Address: 3800 Centerpoint Dr,Suite 1400 Stratigraphic ❑ Service ❑ 6.API Number. Anchorage Alaska 99503 50-029-21968-01-00 7.If perforating: 8.Well Name and Number: What Regulation or Conservation Order governs well spacing in this pool? C.O. 462.007 / Will planned perforations require a spacing exception? Yes 0 No p DUCK IS UNIT SDI 4-04A ' 9.Property Designation(Lease Number): 10.Field/Pool(s): ADL0047502 ENDICOTT/ENDICOTT OIL 11. PRESENT WELL CONDITION SUMMARY Total Depth MD(ft): Total Depth TVD(ft): Effective Depth MD: Effective Depth TVD: MPSP(psi): Plugs(MD): Junk(MD): 12,600' ' 10,379' 12,444' 10,227' 2,100 12,444' 10,227' Casing Length Size MD TVD Burst Collapse Conductor 110' 30" 110' 110' N/A N/A Surface 2,500' 13-3/8" 2,500' 2,496' 5,020psi 2,260psi Intermediate 8,728' 9-5/8" 8,728' 6,879' 8,150psi 5,090psi Production 12,598' 7" 12,598' 10,377' 7,240psi 5,410psi Perforation Depth MD(ft): Perforation Depth TVD(ft): Tubing Size: Tubing Grade: Tubing MD(It): See Attached Schematic See Attached Schematic 4-1/2" 12.6#/13CR-80/Vam Top 12,107 Packers and SSSV Type: Packers and SSSV MD(ft)and TVD(ft): HRD ZXP Liner Top&S-3 and HES HXO SVLN 8,516/6,765&12,020/9,811 and 1,509/1,506 12.Attachments: Proposal Summary ❑ Wellbore schematic Q 13.Well Class after proposed work: Detailed Operations Program ❑ BOP Sketch ❑ Exploratory ❑ Stratigraphic ❑ Development❑ Service ❑✓ 14.Estimated Date for 15.Well Status after proposed work: Commencing Operations: 5/1/2017 OIL ❑ WINJ 0 WDSPL 0 Suspended El 16.Verbal Approval: Date: GAS ❑ WAG ❑ GSTOR 0 SPLUG 0 Commission Representative: GINJ ❑ Op Shutdown 0 Abandoned ❑ 17. I hereby certify that the foregoing is true and the procedure approved herein will not be deviated from without prior written approval. Authorized Name: Bo York Contact Name: Taylor Wellman •Icad Authorized Title: Operations Manager Contact Email: twellmart(CCeI hiIcoro.com Contact Phone: 777-8449 Authorized Signature: U / Date: 4/7/2017 COMMISSION USE ONLY Conditions of approval: Notify Commission so that a representative may witness Sundry Number. , � 7' ` ce Plug Integrity ❑ BOP,yTest Ti Mechanical Integrity Test [ /} Location Clearance/� ❑ Other: $ Gd(ftmcnn.- c y)e„p.c... --;-6-1-s-L ,(v at.�-,')/"�X L4 � ' l w 2 r Post Initial Injection MIT Req'd? Yes 1No 0 RBDMS 1-1-- A4 1� 7 2017 Spacing Exception Required? Yes ❑ No d Subsequent Form Required: j ) 7 3 / APPROVED BY t Approved by:4 �� '" COMMISSIONER THE COMMISSION Date:+_l3—/7 1 L1.11.;7 II A Submit Form and Form 10-403 Revised 4/2017 0 p rdveap iication is valid for 12 months from the date of approval. Attachments in Duplicate • Convert to PWI Well: END 4-04A PTD: 209-019 Hileoru Alaska,LL, API: 50-029-21968-01-00 Well Name: END 4-04A API Number: 50-029-21968-01-00 Current Status: Shut in—High WC Rig: SL Estimated Start Date: May 1, 2017 Estimated Duration: 4 Reg.Approval Req'std? No Date Reg. Approval Rec'vd: Regulatory Contact: Tom Fouts 777-8398 Permit to Drill Number: 209-019 First Call Engineer: Taylor Wellman (907)777-8449 (0) (907) 947-9533 (M) Second Call Engineer: Wyatt Rivard (907) 777-8847 (0) (509) 670-8001 (M) AFE: WeIIEZ Entry Required: Yes Current Bottom Hole Pressure: 4,907psi @ 10,000' TVD (Based on SBHPS on 03/05/17) Maximum Expected BHP: 4,907psi @ 10,000' TVD (Based on SBHPS on 03/05/17) Max. Proposed Surface Pressure: 2100psi (Gas Lift System Pressure) Brief Well Summary: The scope of the project is to convert the 4-04A well, a high water cut production well, to a water injection well to support the 4-18 well. The well was last flowed in April 2016 at a +99%water cut. This project would alter the existing waterflood sweep pattern in the FII/FIII/FIV/FV sands. This project will add pressure support to this area, especially the 4-18 well. Objective: -,t. Convert the well service to produced water injection Variance Requested: 20AAC25.412(b) Packer will be set greater than 200ft measured depth from open perfs /`94. /c lye, cF Area of Review—Endicott DIU 4-04A(209-019) r `✓`�` � -f` i�'7 Prior to the conversion of well 4-04A from producer to water injector, an Area of Review (AOR) must be conducted. This AOR found no other wells within % mile of 4-04A's entry point into the UPSZ ✓ Formations. Table 2:Wells within AOR Well Name PTD Distance, Ft. Annulus Integrity 4-42 209-019 0' MIT-IA on 04/05/09 passed to 3500 psi Table 3:Completion Detail " API Wel;_No Pmt Well C rren1Status Zonatisplanitnt e�(m od) Cement Bond Log run on 4/27/2009 indicates good cement up to the tubing tail at 12,107' and (CBL run post completion). 4- S/I Producer- Drilling records indicate a good cement 50-029-21968-01-00 209-019 04A Endicott Oil Pool job: no noted losses during job, bumped plug, floats held, set liner top packer and circulated out 22 of excess cement from the liner. Est. TOC @ 8,514'MD (top of 7" liner) —3,686' above top perf. cap ,,�1 �Id, r4( i"eII has P,vd t4' ctr . /d0 190,1 te,d 0' 4 q la/ 1H ex ce# o4 ?7gy 64 re 2.0(3. fridifir 4 ttemesIv Cif rh.? c,.tif f40w'i 6'rrle ,'L aft, lr.'efif (over 74,1 (veil To aN i l j eotd' il►OUallow r 14 %ice . . Convert to PWI Well: END 4-04A PTD: 209-019 Hikora Alaska,LL) API: 50-029-21968-01-00 Procedure: Slickline 1. MIRU SL unit and pressure test to 250psi low/2000psi high. 2. Pull 4-1/2" BBE SSSV from 1509' md. 3. Set 4-1/2" PXN plug at 12,085' md. a. Use fill extension prong to ensure ease of recovery later. b. Bleed down tubing pressure to ensure good plug set. 4. Set catcher sub below Station #2 (11,004' md). a. Drift of tubing is up to WSM discretion. b. Have Pad Op shoot FL's to check for hydrostatic imbalance prior to pulling GLV's. 5. Pull GLV's from: a. Station #2 (11,004' md) b. Station #3 (9,762' md) c. Station #4 (7,139' md) d. Station #5 (3,546' md) 6. Set Dummy GLV's in: a. Station #3 (9,762' md) b. Station #4 (7,139' md) c. Station #5 (3,546' md) 7. Set circ valve in Station #2 (11,004' md). 8. Pull catcher sub & RD SL. Operations 9. Circulate the well down the IA and take returns down the flowline w/760bbls of seawater/produced water and freeze protected IA w/55bbls of diesel. Slickline 10. Pull circ valve from Station #2 (11,004' md). 11. Set Dummy GLV in Station #2 (11,004' md). a. Note: Depending on the time of the year (freezing ambient temps) an alternative method for using a pump truck to load the IA with seawater and freeze protect with diesel and setting a dummy GLV in Station #2 (11,004' md) will be done. This would replace step 8. 12. Conduct MIT-IA to 2500psi.--,. /VD-1;47 -��+ t c kr a. Minimum test pressure [0.25 x TVD Packer(9811' md) = 2453psi] 13. Pull PXN plug from 12,085' md. 14. MU 4-1/2" MCX/A1 Injection SSSV and set in nipple @1,509' md. 15. RD SL. Attachments: As-built/ Proposed Well Schematic/AOR Map -77 c a'. Md. T /4 /7 c.. ( - S4 /') • II • • Endicott Unit Well: 4-04A SCHEMATIC Last Copleted: 4/27/2009 IL7corp Alaska,LLC PTD: 209m 019 TREE&WELLHEAD OKB Elev.:54.7'/BF Elev.:16.25 Tree 4-1/160W K Wellhead FMC 30' OPEN HOLE/CEMENT DETAIL r 30" 260sx Arctis Set 13-3/8" 3,441 cu/ft Permafrost in a 17-1/4"Hole 9-5/8" 575 cu/ft Class"G"in a 12-1/4"Hole i4 4 la� 1 7" 1,663 cu/ft Class"G"in a 8-1/2"Hole/Tie Back Lnr CMT @ 8,516' 13-3/g,1 ' CASING DETAIL Size Type Wt/Grade/Conn Drift ID Top Btm BPF ' 30" Conductor N/A N/A Surface 110' N/A 13-3/8" Surface 68/NT-80/Butt 12.415" Surface 2,500' 0.150 9-5/8" Intermediate 47/NT8OHS/NSCC 8.681" Surface 8,728' 0.0732 2 ,i►t b` �L. 26/L-80/TCI I 6.276" Surface 8,526' 0.0383 y;(-, 7" Production 26/L-80/Hyd 521 6.276" 8,516' 11,352' 0.0383 ` '1 26/13CR-80/Hyd 521 6.276" 11,352' 12,598' 0.0383 3 TUBING DETAIL i4-1/2" Tubing 12.6/13CR80/Vam Top 3.958" Surf 12,107' 0.0152 WELL INCLINATION DETAIL ,- 4 I Max Angle is 58 deg.@ 8,312' :,f"5 JEWELRY DETAIL �e 6 No Depth Item 1 1,509' 4-1/2"HES HXO SVLN X-Profile(3.813"ID) NilbutWndow- GLM DETAIL: KBG w/ZBK Latch 9-5/8" 8,728'to 8,735' 2 3,546' ST 5:Port=16,Dev.=21,TVD=3,515',VIv=Dome,5/9/2009 ' 3 7,139' ST 4:Port=16,Dev.=55,TVD=6,003',VIv=Dome,5/9/2009 k / 7 4 8,493' 7"Tie Back Liner,ID=6.276" • 5 8,514' 7"Tie Back Seal,ID=6.23" ` 6 8,516' 9-5/8"x 7"HRD ZXP LTP w/Tie-Back Seal Assy&Flex Lock Liner Hanger,ID=6.23 8 ' 7 9,762' ST 3:Port=16,Dev.=28,TVD=7,605',VIv=Dome,5/9/2009 8 11,004' ST 2:Port=24,Dev.=10,TVD=8,810',VIv=SO,6/16/2009 9 . 9 11,911' ST 1:Port=0,Dev.=11,TVD=9,704',VIv=Dmy,6/16/2009 ' * 10 t 10 11,990' 4-1/2"HES X Nipple,ID=3.813" " - 11 12,020' 7"x 4-1/2"Baker S-3 Packer,ID=3.875" LP i 11 12 12,054' 4-1/2"HES X Nipple,ID=3.813" Pac • • 13 12,085' 4-1/2"HES XN Nipple,ID=3.725" 111; 12 • 14 12,107' 4-1/2"WLEG,ID=3.958" 15 12,454' HTT Bridge Plug 13 ENDICOTT PERFORATION DETAIL , WOSt Top(MD) Btm(MD) Top(TVD) Btm(TVD) FT Date Status Size 1R2P @ X 14 12,200' 12,224' 9,988' 10,011' 24 4/29/2009 Open 3-3/8" L2,255' 12,277' 10,042' 10,014' 22 4/28/2009 Open 3-3/8" _12,289' 12,311' 10,075' 10,097' 22 4/28/2009 Open 3-3/8" • 42,332' 12,352' 10,117' 10,137' 20 4/27/2009 Open 3-3/8" V :12,372' 12,392' 10,141' 10,160' 20 11/26/2015 Open 3-1/8" 17 IZ La 12,416' 12,429' 10,199' 10,212' 13 4/28/2009 Open 3-3/8" 12,452' 12,465' 10,234' 10,247' 13 4/28/2009 Closed 3-3/8" ' 12,465' 12,485' 10,247' 10,267' 20 4/27/2009 Closed 3-3/8" Plugwl10' Endicott Sands NOTE:Angle @ Top Perforation=11'/Ref:SLB MD Log on 3/29/2009 Cement. TOC • ±12,444' '1 SAFETY NOTE GENERAL WELL INFO 15 H2S Readings Average 230-260 PPM API:50-029-21968-01-00 on A/L&Gas Injectors/Well Requires Drilled,Cased&Completed by Doyon 15 -9/20/1989 ' ',,,k---:. a SSSV/Chrome Tubing&Liner Sidetracked by Doyon 14-4/5/2009 Pull IBP-12/22/2013 7 r k, A 7:.` - Set IBP-4/1/2014 TD=12,600(MD)/TD=10,379'(TVD) Sluggits-4/8/2014 PBTD=12,512'(MD)/PBTD=10,293'(TVD) Pull Sluggits and IBP-8/2/2014 Add Plug&Perforations-11/26/2015 Created By:TDF 12/7/2015(V) • . . 7) ch .-.-7;4AI Mille \ 'N, Airdir" , Mao jJjf ....- - ium.••••••70.7.01,.........77,t7„..r_ ,.......00,0rEt ..__,...„„..--'27g :;4ke 1 0I -.....0.0""" ,,,,,,---10;;00/ j A . . ..., Oa, ii iii . 7 III cin I /•— i I � Ai co 1 T I 1 ,- I 00 O 0 e-r 1 1 Tr M I/ I • ` I1- $i Ai 1 • 1 rn • / MIT) / AI . .... .... sm. ."-- Jo F O0 -al fn z ¢ EH E o Q w ZJ E co Q w U Q _1 8 _ _ea CO a 3 m v 3 - (f)LL r� cin.. d O - .. V 3 CCNA,e^ W in 4. O = o p • '2p U v W`o' - LL N 5 O a IE,- w J N a a �1 r J K F w Z g a c 3 '« m KF.--.. ,u u r M = Z O p —0_I to O. a ? y ul mo.=0- 8 Q ¢ ,l ‘‘,.'14t - A a o 1 < a BYOK '* EO<mm 05r a 3a=nm STATE OF ALASKA AL KA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS 1.Operations Abandon U Plug Perforations U Fracture Stimulate _] Pull Tubing LI Operations shutdown Performed: Suspend ] Perforate L Other Stimulate ] Alter Casing ] Change Approved Program ❑ Plug for Redrill ❑ erforate New Pool ❑ Repair Well ❑ Re-enter Susp Well ❑ Set Plug&Dump Bail Cement ❑✓ 2. Name: 4.Well Class Before Work: 5. Permit to Drill Number: Hilcorp Alaska LLC Development ❑, Exploratory ❑ 209-019 ' 3.Address: Stratigraphic❑ Service ] 6.API Number: 3800 Centerpoint Dr,Suite 1400 50-029-21968-01-00 7.Property Designation(Lease Number): 8.Well Name and Number: ADL0047502 DUCK IS UNIT SDI 4-04A/T30 ,kat•C i, 9.Logs(List logs and submit electronic and printed data per 20AAC25.071): 10.Field/Pool(s): N/A ENDICOTT/ENDICOTT OIL DEC 0 8 2015 11. Present Well Condition Summary: AOGCC Total Depth measured 12,600 ' feet Plugs measured 12,444 feet true vertical 10,379 . feet Junk measured 10,227 feet 8,516 Effective Depth measured 12,444 feet Packer measured 12,020 feet 6,765 true vertical 10,227 feet true vertical 9,811 feet Casing Length Size MD TVD Burst Collapse Conductor 110' 30" 110' 110' N/A N/A Surface 2,500' 13-3/8" 2,500' 2,496' 5,020psi 2,260psi Intermediate 8,728' 9-5/8" 8,728' 6,879' 8,150psi 5,090psi Production 12,598' 7" 12,598' 10,377' 7,240psi 5,410psi Perforation depth Measured depth See Attached Schematic True Vertical depth See Attached Schematic Tubing(size,grade,measured and true vertical depth) 4-1/2" 12.6#/13CR-80/Vam Top 12,107' 9,896' HRD ZXP Liner Top 1,509(MD) Packers and SSSV(type,measured and true vertical depth) S-3 HES HXO SVLN See Above 1,506(TVD) 12.Stimulation or cement squeeze summary: N/A Intervals treated(measured): N/A Treatment descriptions including volumes used and final pressure: N/A 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation: 0 0 0 2,000 283 Subsequent to operation: 16 251 5,344 200 304 14.Attachments(required per 20 AAC 25 070.25.071,&25.283) 15.Well Class after work: 1. Daily Report of Well Operations CI Exploratory❑ Development[] Service ❑ Stratigraphic ❑ Copies of Logs and Surveys Run ❑ 16.Well Status after work: Oil 0 Gas A WDSPL 7 Printed and Electronic Fracture Stimulation Data ❑ GSTOR ❑ WINJ ] WAG ❑ GINJ ❑ " SUSP❑ SPLUG❑ 17.I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O.Exempt: 315-550 Contact Taylor Wellman Email twellman(cr7hilcorp.com Printed Name Mie Dunn Title Operations Engineer Signature Phone 777-8382 Date 12/7/2015 RBDMS 112015 Form 10-404 Revised 5/2015 // .---- Submit Original Only . •TI • • Endicott Unit Wel l: 4-04A SCHEMATIC Last Completed: 4/27/2009 Hilcora Alaska,LLC PTD: 209-019 TREE&WELLHEAD CKB Elev.:54.7/BF Elev.:16.25 Tree 4-1/16CIW i$' W Wellhead FMC 30' OPEN HOLE/CEMENT DETAIL �. �, 30" 260sx Arctis Set i 13-3/8" _ 3,441 cu/ft Permafrost in a 17-1/4"Hole 1 �. 9-5/8" 575 cu/ft Class"G"in a 12-1/4"Hole '-in y, '!' i 7" 1,663 cu/ft Class"G"in a 8-1/2"Hole/Tie Back Lnr CMT @ 8,516' 13-3/8" CASING DETAIL 'I Size Type Wt/Grade/Conn Drift ID Top Btm BPF 30" Conductor N/A N/A Surface 110' N/A 13-3/8" Surface 68/NT-80/Butt 12.415" Surface 2,500' 0.150 2 9-5/8" Intermediate 47/NT8OHS/NSCC 8.681" Surface 8,728' 0.0732 26/L-80/TCII 6.276" Surface 8,526' 0.0383 o 7" Production 26/L-80/Hyd 521 6.276" 8,516' 11,352' 0.0383 *r. 26/13CR-80/Hyd 521 6.276" 11,352' 12,598' 0.0383 'f 3 TUBING DETAIL " 4-1/2" Tubing 12.6/13CR80/Vam Top 3.958" Surf 12,107' 0.0152 d» WELL INCLINATION DETAIL °V I I !4 Max Angle is 58 deg.@ 8,312' 1 0s JEWELRY DETAIL s aNo Depth Item 1 1,509' 4-1/2"HES HXO SVLN X-Profile(3.813"ID) 9-5/8”,Il ii°^iI Wndbw- GLM DETAIL:KBG w/ZBK Latch 8728, to 8,738, 2 3,546' ST 5:Port=16,Dev.=21,TVD=3,515',VIv=Dome,5/9/2009 3 7,139' ST 4:Port=16,Dev.=55,TVD=6,003',VIv=Dome,5/9/2009 7 4 8,493' 7"Tie Back Liner,ID=6.276" 5 8,514' 7"Tie Back Seal,ID=6.23" 6 8,516' 9-5/8"x 7"HRD ZXP LTP w/Tie-Back Seal Assy&Flex Lock Liner Hanger,ID=6.23 87 9,762' ST 3:Port=16,Dev.=28,TVD=7,605',VIv=Dome,5/9/2009 a 8 11,004' ST 2:Port=24,Dev.=10,TVD=8,810',VIv=50,6/16/2009 = �9 9 11,911' ST 1:Port=0,Dev.=11,TVD=9,704',VIv=Dmy,6/16/2009 e�,110 10 11,990' 4-1/2"HES X Nipple,ID=3.813" 11 12,020' 7"x 4-1/2"Baker S-3 Packer,ID=3.875" ' 11 12 12,054' 4-1/2"HES X Nipple,ID=3.813" 13 12,085' 4-1/2"HES XN Nipple,ID=3.725" 12 14 12,107' 4-1/2"WLEG,ID=3.958" Ewa' 15 12,454' HTT Bridge Plug = ENDICOTT PERFORATION DETAIL :t 13 'A ea 9'' Top(MD) Btm(MD) Top(ND) Btm(TVD) FT Date Status Size RA Tag@ 14 12,200' 12,224' 9,988' 10,011' 24 4/29/2009 Open 3-3/8" 12,206 12,255' 12,277' 10,042' 10,014' 22 4/28/2009 Open 3-3/8" 12,289' 12,311' 10,075' 10,097' 22 4/28/2009 Open 3-3/8" }, 12,332' 12,352' 10,117' 10,137' 20 4/27/2009 Open 3-3/8" Al 12,372' 12,392' 10,141' 10,160' 20 11/26/2015 Open 3-1/8" L‘t 12,416' 12,429' 10,199' 10,212' 13 4/28/2009 Open 3-3/8" 12,452' 12,465' 10,234' 10,247' 13 4/28/2009 Closed 3-3/8" 44 , 12,465' 12,485' 10,247' 10,267' 20 4/27/2009 Closed 3-3/8" Plug H/10' 11 - •icctt Saris NOTE:Angle @ Top Perforation=11'/Ref:SLB MD Log on 3/29/2009 Oame t TOC ±12,444' Yu_ r zio SAFETY NOTE GENERAL WELL INFO 15 H2S Readings Average 230-260 PPM API:50-029-21968-00-00 on A/L&Gas Injectors/Well Requires Drilled,Cased&Completed by Doyon 15 -9/20/1989 a SSSV/Chrome Tubing&Liner Sidetracked by Doyon 14-4/5/2009 >" -y Pull IBP-12/22/2013 7'40:M1. .!, 4 Set IBP-4/1/2014 TD=12,600(MD)/TD=10,379'(TVD) Sluggits-4/8/2014 PBTD=12,512'(MD)/PBTD=10,293'(TVD) Pull Sluggits and IBP-8/2/2014 Add Plug&Perforations-11/26/2015 Created By:TDF 12/7/2015(V) • • Hilcorp Alaska, LLC Hi<<.,,,.!,Alaska,LLC Weekly Operations Summary Well Name API Number _Well Permit Number Start Date End Date END 4-04A 50-029-21968-00-00 209-019 9/6/2015 11/26/2015 Daily Operations: 9/2/15-Wednesday No operations to report. 9/3/15-Thursday No operations to report. 9/4/15-Friday No operations to report. 9/5/15-Saturday No operations to report. 9/6/15-Sunday RU SL, PRESSURE TEST LUBRICATOR TO 300PSI LOW/3,000PSI HIGH. MADE MULTIPLE RUNS WI STIFF 4-1/2" BLB'S, G- RINGS,AND CENTRALIZERS.TO CLEAR UP RESTRICTION AT THE TUBING HANGER*** POSSIBLE SCALE ***. DROPPED DOWN TO 3.25"AND WORKED BACK UP TO 3.70" .See log for details.TAGGED TOP OF BBE SSSV @ 1,491'SLM, 1,509' MD 9/7/15-Monday RU SL, PRESSURE TEST LUBRICATOR TO 300PSI LOW/2,500PSI HIGHMADE MULTIPLE BROACH/G-RING RUNS TO CLEAR RESTRICTION FROM TUBING HANGER DOWN TO 100' PULLED BBE SCSSSV, (SER#BB4-39) FROM HXO @ 1,491'SLM, 1,509' MD. RAN BAITED 27.42'X 3.45" DUMMY PERF GUN DRIFT TO 12,470'SLM. 1,600 LBS P/U WEIGHTS ON BOTTOM. RDMO 9/8/15-Tuesday No operations to report. • • Hilcorp Alaska, LLC Hilcorp Ala, k.,,LLC Weekly Operations Summary Well Name API Number Well Permit Number Start Date End Date END 4-04A 50-029-21968-00-00 209-019 9/6/2015 11/26/2015 Daily Operations: 9/30/15-Wednesday Pressure test Lubricator to 300psi low/3,000psi high.Set HTTBP plug at 12,454' md. Correlated to MWD Log 29-March- 2009. POOH and confirm only 1 cement kit. RD EL unit. 10/1/15-Thursday No operations to report. 10/2/15-Friday No operations to report. 10/3/15-Saturday No operations to report. 10/4/15-Sunday No operations to report. 10/5/15-Monday No operations to report. 10/6/15-Tuesday No operations to report. • • Hilcorp Alaska, LLC Hi,eurp AIasku,LLC Weekly Operations Summary Well Name API Number Well Permit Number Start Date End Date END 4-04A 50-029-21968-00-00 209-019 9/6/2015 ######### Daily Operations: 10/14/15-Wednesday No operations to report. 10/15/15-Thursday RU SL, PRESSURE TEST LUBRICATOR TO 2,100PSI HIGH. DUMP A PARTIAL UNKNOWN AMOUNT OF CEMENT ON TOP OF THE TTEBP, NOT ALL CEMENT CAME OUT OF THE BAILER DUE TO CEMENT PARTIALLY SETTING UP EARLY. HAVE NEO SYSTEMS CEMENT SENT TO LOCATION TO RUN THE NEXT DAY. 10/16/15-Friday RU SL, PRESSURE-TE-LUBRICATOR TO 2,250PSI HIGH. Make 3 runs to dump a total of 15 gallons of ceme.rl on op of_ plug. Est.TOC= 12,443' md. RD EL unit 10/17/k-Saturday No opera€ ns to report. 10/18/15-Sunday No operations to report. 10/19/15-Monday PT 300 PSI LOW&2,500 PSI HIGH (GOOD TESTS). DRIFTED W/4-1/2" BLB&3.80" G-RING TO 1,509' MD AND BRUSHED SSSV NIPPLE. RAN 3.84"G-RING AND COULD NOT GET PASSED 2'SLM.CURRENTLY BROACHING FROM 2' DOWN TO 100' STARTED OUT WITH 3.818" BROACH WORKED UP TO 3.825" BROACH TO CLEAN UP RESTRICTION. LDFN. PAD OP POP THE WELL AND FLOW OVERNIGHT. 10/20/15-Tuesday No operations to report. • i Hilcorp Alaska, LLC Weekly Operations Summary Well Name Rig API Number Well Permit Number Start Date _ End Date END 4-04A Slickline 50-029-21968-01-00 209-019 9/6/15 11/26/15 Daily Operations: 10/21/2015-Wednesday No activity to report. 10/22/2015-Thursday No activity to report. 10/23/2015- Friday No activity to report. 10/24/2015 -Saturday No activity to report. 10/25/2015-Sunday RU SL, PRESSURE TEST LUBRICATOR TO 2,500PSI HIGH. RAN 3.805" G-RING DOWN TO SSSV NIPPLE AT 1,509' MD. RAN THE 3.835" BROACH MULTIPLE TIMES BROACHING TUBING FROM 0-100' SLM. RAN 3.85 DIAMOND BROACH AND WAS UNABLE TO PASS 5' SLM. RERAN 3.835 BROACH W/3.90" STIFF BRUSH WHILE PUMPING DIESEL. LDFN. 10/26/2015 - Monday RU SL, PRESSURE TEST LUBRICATOR TO 2,500PSI HIGH. RAN 4-1/2" BLB & 3.805 G-RING, BRUSHED SSSV NIPPLE @ 1,495' SLM. RAN 4-1/2" BLB& 3.85" G-RING, UNABLE TO PASS 5' SLM. RAN 3.84" NOGO, 3' 1-7/8" STEM, 4-1/2" BLB&3.805" G- RING, MADE MULTIPLE PASSES THRU TREE, DRIFTED DOWN TO SSSV NIPPLE @ 1,495'SLM. SET 4-1/2" BBE (SER# HNBB-05 3 sets of std pkg). CONTROL AND BAL LINE INTEGRITY GOOD. WELL TENDER PERFORMED PASSING CLOSURES TEST. RDMO. 10/27/2015 -Tuesday No activity to report. • • Hilcorp Alaska, LLC Weekly Operations Summary Well Name Rig API Number Well Permit Number Start Date End Date END 4-04A Slickline 50-029-21968-01-00 209-019 9/6/15 11/26/15 Daily Operations: 11/18/2015 -Wednesday No activity to report. 11/19/2015-Thursday No activity to report. 11/20/2015- Friday No activity to report. 11/21/2015-Saturday No activity to report. 11/22/2015 -Sunday PRESSURE TEST TO 300PSI LOW/2,100PSI HIGH. DRIFTED W/3.84" NO GO CENT AND CANNOT MAKE IT PAST 5' SLM. DRIFTED W/3.80" G-RING AND TAG SSSV @ 1,491' SLM/1,509' MD. PULLED 4.5" BBE (SER# HNBB-05) @ 1,491' SLM/1,509' MD. RAN 22' 3.45" DUMMY GUN UNABLE GET PAST 8,712' SLM, P/U WEIGHT IS 1,200#, PU WEIGHTS. RUN 2.5" DD BAILER AND TAG BOTTOM @ 12,383' SLM, P/U WEIGHT AT TAG DEPTH 1,580#. 11/23/2015- Monday PT 2100 PSI (GOOD TEST). RUN 3.5" CENT AND 1 3/4" SAMPLE BAILER, SAT DOWN ONE TIME @ 8,820' SLM CAME UP HOLE 50'AND DRIFTED RIGHT PAST RESTRICTION. VERY SLOW RUNNING IN HOLE 40' PER MINUTE FROM 3,000'SLM UNTIL TAGGING CEMENT @ 12,383' SLM. RDMO. / f 11/24/2015 -Tuesday No activity to report. • 41) Hilcorp Alaska, LLC Weekly Operations Summary Well Name Rig API Number Well Permit Number Start Date End Date END 4-04A E-line 50-029-21968-00-00 209-019 9/6/15 11/26/15 Daily Operations: 11/25/2015-Wednesday No activity to report. 11/26/2015-Thursday WELL SHUT IN UPON ARRIVAL. RIG UP E LINE. PRESSURE TEST PCE TO 300PSI LOW/2,100PSI HIGH. RIH W/GAMMA PERF- 20' HSC GUN. CORRELATE TO SLB MEASURED DEPTH LOG FINAL PRINT 29-MAR-2009. PERFORATE 12,372'-12,392'. RIG DOWN E LINE. WELL LEFT SHUT IN, HANDED BACK TO DSO. 11/27/2015 - Friday No activity to report. 11/28/2015-Saturday No activity to report. 11/29/2015-Sunday No activity to report. 11/30/2015- Monday No activity to report. 12/1/2015-Tuesday No activity to report. ti OF Ty yw\ �7,ts, THE STATE Alaska Oil and Gas F�— � ��, of Conservation Commission :�_: ALASI�:A • tl-itz_,_ = 333 west Seventh Avenue GOVERNOR BILL WALKER Anchorage, Alaska 99501-3572 Main 907.279.1433 Off"ALAS ' Fax: 907.276.7542 ONE www.aogcc.alaska.gov SC Taylor Wellman Operations Engineer Hilcorp Alaska, LLC 3800 Centerpoint Drive, Suite 1400 Anchorage, AK 99503 Re: Endicott Field, Endicott Oil Pool, DIU SDI 4-04/T30 Sundry Number: 315-550 Dear Mr. Wellman: Enclosed is the approved application for sundry approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the AOGCC grants for good cause shown, a person affected by it may file with the AOGCC an application for reconsideration. A request for reconsideration is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. Sincerely, P3u.t.1 Cathy P Foerster Chair DATED this tclay of September, 2015 RBDM SEP IUM Encl. RECEIVED STATE OF ALASKA SEP 0 2 �15 ALASKA OIL AND GAS CONSERVATION COMMISSION ,''TS (3/8d 13 APPLICATION FOR SUNDRY APPROVALS AOGC 0 AAC 25.280 1 Type of Request: Abandon 9 Plug Perforations Ii' Fract ire Stimulate ❑ Pull Tubing ❑ Operations shutdown 9 Suspend 9 Perforate ❑✓ -4'0(4tther Stimulate ❑ Alter Casing 9 Change Approved Program 9 Plug for Redrill❑ Perforate New Pool ❑ Repair Well 0 Re-enter Susp Well 0 Set Plug&Dump Bad Cement 9 2.Operator Name. 4.Current Well Class: 5.Permit to Drill Number: Hilcorp Alaska,LLC Exploratory 9 Development 9 • 209-019. 3.Address: Stratigraphic 9 Service ❑ 6.API Number. 3800 Centerpoint Drive,Suite 1400,Anchorage AK,99503 50-029-21968-01-00' 7.If perforating: 8.Well Name and Number. What Regulation or Conservation Order governs well spacing in this pool? C.O.462 • Will planned perforations require a spacing exception? Yes ❑ No 9 . DUCK IS UNIT SDI 4-04A/T30 ' 9.Property Designation(Lease Number): 10.Field/Pool(s). ADL0047502 ' ENDICOTT/ENDICOTT OIL- 11. PRESENT WELL CONDITION SUMMARY Total Depth MD(ft): Total Depth TVD(ft): Effective Depth MD(ft): Effective Depth TVD(ft): Plugs(measured): Junk(measured): 12,600 - 10,379 . 12,512 10,293 N/A N/A Casing Length Size MD TVD Burst Collapse Conductor 110' 30" 110' 110' N/A N/A Surface 2,500' 13-3/8" 2,500' 2,496' 5,020psi 2,260psi Intermediate 8,728' 9-5/8" 8,728' 6,879' 8,150psi 5,090psi Production 12,598' 7" 12,598' 10,377' 7,240psi 5,410psi Liner Perforation Depth MD(ft): Perforation Depth TVD(ft): Tubing Size. Tubing Grade: Tubing MD(ft): See Attached Schematic See Attached Schematic 4-1/2" 12.6#/13CR-80/Vam Top 12,107 Packers and SSSV Type: Packers and SSSV MD(ft)and TVD(ft): HRD ZXP Liner Top&S-3 and HES HXO SVLN 8,516/6,765&12,020/9,811 and 1,509/1,506 12.Attachments: Description Summary of Proposal 9 13.Well Class after proposed work: Detailed Operations Program ❑ BOP Sketch ❑ Exploratory ❑ Stratigraphic❑ Development 9 • Service ❑ 14.Estimated Date for 15.Well Status after proposed work: 9/15/2015 9 0 Commencing Operations: OILWINJWDSPL ❑ Suspended ❑ 16.Verbal Approval: Date: GAS ❑ WAG ❑ GSTOR 0 SPLUG ❑ Commission Representative: GINJ ❑ Op Shutdown 0 Abandoned ❑ 17.I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Taylor Wellman Email twellman@hilcorp.com Printed Name Taylor Wellman Title Operations Engineer Signature f�_ I / Phone 777-8449 Date 9/2/2015 COMMISSION USE ONLY Conditions of approval. Notify Commission so that a representative may witness Sundry Number: '315-550 Plug Integrity ❑ BOP Test ❑ Mechanical Integrity Test ❑ Location Clearance 0 Other: Spacing Exception Required? Yes ❑ No u Subsequent Form Required: !/Jr --- 4- - 4-- APPROVED BY Approved by. COMMISSIONER THE COMMISSION Date: q_8_, /S--- vi /4- j5 • p� SEP 0 L 1Qltbmit Form and Form 10-403 Revised 5/2015 nPil2aiitkirll� lid for 12 monthspom the did al. ttac ments in Duplicate Set Plug&Add Perf Well: END 4-04 PTD: 209-019 Hilcorn Alaska,LU API: 50-029-21968-01 Well Name: END4-04 API Number: 50-029-21968-01 Current Status: SI—High WC Rig: EL&SL Estimated Start Date: September 15, 2015 Estimated Duration: 4 days Reg.Approval Req'std? YES Date Reg.Approval Rec'vd: Regulatory Contact: Tom Fouts 777-8398 Permit to Drill Number: 209-019 First Call Engineer: Taylor Wellman (907)777-8449 (0) (907)947-9533 (M) Second Call Engineer: Mike Dunn (907)777-8382 (0) (907) 351-4191 (M) Current Bottom Hole Pressure: 3308psi @ 10,000' TVD (Based on SBHPS on 4-02 07/21/14) Maximum Expected BHP: 3308psi @ 10,000' TVD (Based on SBHPS on 4-02 07/21/14) Max.Anticipated Surface Pressure: 2100psi (Based on historical max SIWHP—Gas Lift Pressure) Reference Log: MWD: Measured Depth Log FINAL Print 29-March-2009 Brief Well Summary: Well 4-04 is a gas lifted production well. In 2014 there have been 3 attempts to set water shut off plugs. On April 7, 2014 an IBP set in-between perforations. Sometime between April and August the IBP dislodged and became lodged in the SSSV. On August 1-2, Slickline was able to recover the SSSV and the IBP from the well. All IBP elements are believed to be recovered and the well was drifted with a 3.625" cent and 3.5" DD bailer to 12,486' MD. On Oct 13, 2014 a HEX plug was attempted to be set but inadvertently set off depth and had to be fished from the well. All pieces of the HEX plug were recovered. A second attempt to set a HEX plug was conducted on Oct 29,2014 but the setting failed. On Nov 01, 2014 the SSSV was set without issue and the well returned to production. Current SSSV in well: 4-1/2" BBE w/3 sets of standard packing&secondary lockdown Objective: Set plug @ 12,454' &dump+/- 10' cement on top (isolation plug of the FII sands) ' Add perf 12,356'—12,380' and (add perfs into the lower FIII, which is already perforated) • Procedure: E-Line 1. MIRU EL unit and pressure test to 300psi low and 2100psi high. 2. MU Halliburton TTBP toolstring. 3. RIH with TTBP and set the top of the TTBP at+1-12,454' MD. a. Reference log: MWD: Measured Depth Log FINAL Print 29-March-2009. b. Plug is an isolation plug for the FII sand. 4. RIH and correlate above the TTBP. Dump +/-10' of cement onto plug. 5. MU perforating toolstring w/ 24' of 3-1/8" Millennium HMX guns. 6. RIH and perforate 12,356' —12,380' md. a. Reference log: MWD: Measured Depth Log FINAL Print 29-March-2009. 7. RD EL. Attachments: As-built&Proposed Well Schematic, Deviation Survey. Set Plug&Add Perf II Well: END 4-04 PTD: 209-019 API: 50-029-21968-01 TIilcory Alaska,LL) VIVIY '13111 "4c00565 Schlumberger Company: BP Exploration Alaska Inc. FINAL Well: 4-04A;T-30 SCOPE= Servic,, Fig :i Endicott Rlg: Doyon 14 ‘-.7:),,:-....E- Alaska p t_ 4. Measured Depth Log Recorded Mode 1-INAL Pri a Scale 1:600& 1:240 o a 113(] Totdepth 10 f1 t KB NA yr o, 2 v Spud date 18-Mar-09 ELL 14.50 ft •_ A. 5 Rurss: t 10 1 ire D F. 48.05 2 e A Permanent datum: Mean Sea Level Elev.: • CS _OP ft . au X 4 m -� Log measured from. Drill linnr 415.9511 above Penn datum 8 f Depth reference- _lour„y PpChdAL _ _It -4API€ API serial no. 2578 F51, FEL Longitude Latitude .11 It if > 50_029.1!1966,43 Sac.OR,'r//N,Fi17E,UM W 147-8634225 N 70 32113325 _ Depth logged 8628 5 To 12580 II Mag<ieci: 23.18 deg_ Other serviea- Date logged: 23 Mar-09 to 28-Mar-Op Mag dip: 81.02 deg, DO,APWD Dore hole record Casing record Hale size from to Size Dermal,. horn lo 50 A7111 i.,,.. - , 0113m/it� 0113m/it5u >g 111A91t,._ l LDWG MO Dsptta*872$to 12517 S r t ud tmoni -irehole.. .r to. - Tvde ,�: ?T. la ISNU 67288 1280011 G46 deg 57.08.-.. 872811 128000 �. r 11111111111 I _ Surface equipmerw Software record r _ Unit O 001 IDEAL W is UW13 OC 14 Depth system DESCA SPM i3 0o O3 r LWD Eco 10 14.2 a MWD PUP 9,2 Endicott Unit Well: 4-04A 14 SCHEMATIC Last Completed: 4/27/2009 Hamra Alaska,LLC PTD: 209-019 CASING DETAIL OKB Elev.:54.7'/BF Elev.:16.25 Size Type Wt/Grade/Conn Drift ID Top Btm �',� C` " 30" Conductor N/A _ N/A Surface 110' 3a'+4 t r, 13-3/8" Surface 68/NT-80/Butt 12.415" Surface 2,500' E 9-5/8" Intermediate 47/NT8OHS/NSCC 8.681" _ Surface _ 8,728' 26/L-80/TCI I 6.276" Surface 8,526' r'' 7" Production 26/L-80/Hyd 521 6.276" 8,516' 11,352' Ifs 1 26/13CR-80/Hyd 521 6.276" 11,352' 12,598' TUBING DETAIL I:. ! 4-1/2" Tubing 12.6/13CR80/Vam Top 3.958" Surf 12,107' +J" k JEWELRY DETAIL X3/8`l 6 No Depth Item 2 i 1 1,509' 4-1/2"HES HXO SVLN X-Profile(3.813"ID) I 2 3,546' GLM#5 3 7,139' GLM#4 3 4 8,493' 7"Tie Back Liner,ID=6.276" 5 8,514' 7"Tie Back Seal,10=6.23" 6 8,516' 9-5/8"x 7"HRD ZXP LTP w/Tie-Back Seal Assy&Flex Lock Liner Hanger,ID=6.23 7 9,762' GLM#3 4 8 11,004' GLM#2 9 11,911' GLM#1 10 11,990' 4-1/2"HES X Nipple,ID=3.813" 5 11 12,020' 7"x 4-1/2"Baker S-3 Packer,ID=3.875" 12 12,054' 4-1/2"HES X Nipple,ID=3.8813" 13 12,085' 4-1/2"HES XN Nipple,ID=3.725" 6 14 12,107' 4-1/2"WLEG,ID=3.958" I ENDICOTT PERFORATION DETAIL 7 Top(MD) Btm(MD) Top(ND) Btm(ND) FT Date Status 8 12,200' 12,224' 9,988' 10,011' 24 4/29/2009 Open 12,255' 12,277' 10,042' 10,014' 22 4/28/2009 Open I 9 12,289' 12,311' 10,075' 10,097' 22 4/28/2009 Open 11. 12,332' 12,352' 10,117' 10,137' 20 4/27/2009 Open 4410 12,416' 12,429' 10,199' 10,212' 13 4/28/2009 Open 1 12,452' 12,465' 10,234' 10,247' 13 4/28/2009 Open _ 11 12,465' 12,485' 10,247' 10,267' 20 4/27/2009 Open a NOTE:Angle @ Top Perforation=11°/Ref:SLB MD Log on 3/29/2009 12lir OPEN HOLE/CEMENT DETAIL E 9 13 30" ' 260sx Arctis Set 13-3/8" 3,441 cu/ft Permafrost in a 17-1/4"Hole 9-5/8” 575 cu/ft Class"G"in a 12-1/4"Hole 7" 1,663 cu/ft Class"G"in a 8-1/2"Hole/Tie Back Lnr CMT @ 8,516' 14 95/8 WELL INCLINATION DETAIL - aMax Angle is 58 deg.@ 8,312' TREE&WELLHEAD t Tree 4-1/16CIW );, Wellhead FMC 3 Hex Plug Slips' 10/28/2014 GENERAL WELL INFO 3-3/8"Bkr 0', API:Sands API:50-029-21968-00-00 CrossfIcwIBP 4 Drilled,Cased&Completed by Doyon 15 -9/20/1989 9/2/2014 '4' Sidetracked by Doyon 14-4/5/2009 12,676 SLM Pull IBP-12/22/2013 6"Sealing Bement and Top of Said Set IBP-4/1/2014 stiffener Ring • 7 Plug @12,577' Sluggits-4/8/2014 7/1y27 } Pull Sluggits and IBP-8/2/2014 7.,j ,' ...- SAFETY NOTE 1D=12,800(MD)/1D=10,353'(TVD) PBTD=12,577'(MD)/PBTD=10,165'(TVD) H25 Readings Average 230-260 PPM on A/L&Gas Injectors/Well Requires a SSSV/Chrome Tubing&Liner Created By:TDF 9/2/2015 Endicott Unit Well: 4-04A .. 14 PROPOSED Last Completed: 4/27/2009 Ililcorp Alaska,LLC PTD: 209-019 CASING DETAIL OKB Elev.:54.7'/BF Elev.:16.25 Size Type Wt/Grade/Conn Drift ID Top Btm A ), (. ,, 1 30" Conductor N/A N/A Surface 110' WM t 4 � 13-3/8" Surface 68/NT-80/Butt 12.415" Surface 2,500' 9-5/8" Intermediate 47/NT8OHS/NSCC 8.681" Surface 8,728' ZI � 26/L-80/TCII 6.276" Surface 8,526' P k, 7" Production 26/L-80/Hyd 521 6.276" 8,516' 11,352' i 1 ,4 li 26/13CR-80/Hyd 521 6.276" 11,352' 12,598' r r 1 , , 4 ►4 rs TUBING DETAIL 13-3/8'" kil' 4-1/2" Tubing 12.6/13CR80/Vam Top 3.958" Surf 12,107' JEWELRY DETAIL I" kNo Depth Item ' 21 1 1,509' 4-1/2"HES HXO SVLN X-Profile(3.813"ID) 2 3,546' GLM#5 41 T. 3 7,139' GLM#4 '' v 3 4 8,493' 7"Tie Back Liner,ID=6.276" t. i0 5 8,514' 7"Tie Back Seal,ID=6.23" 4j Aotl 4 6 8,516' 9-5/8"x 7"HRD ZXP LTP w/Tie-Back Seal Assy&Flex Lock Liner Hanger,ID=6.23 7 9,762' GLM#3 8 11,004' GLM#2 14 9 11,911' GLM#1 i 5 10 11,990' 4-1/2"HES X Nipple,ID=3.813" :,, '6 11 12,020' 7"x 4-1/2"Baker S-3 Packer,ID=3.875" qt 0 , 12 12,054' 4-1/2"HES X Nipple,ID=3.813" +."4, 13 12,085' 4-1/2"HES XN Nipple,ID=3.725" ' ,•'' MI�Wn - 14 12,107' 4-1/2"WLEG,ID=3.958" 9-5/8"418,728'to 8,735' ENDICOTT PERFORATION DETAIL 7 Top(MD) Btm(MD) Top(TVD) Btm(TVD) FT Date Status I 12,200' 12,224' 9,988' 10,011' 24 4/29/2009 Open 12,255' 12,277' 10,042' 10,014' 22 4/28/2009 Open 8 12,289' _ 12,311' 10,075' 10,097' 22 4/28/2009 : Open 1 12,332' 12,352' 10,117' 10,137' 20 4/27/2009 Open 110 9 ±12,356' ±12,380' ±10,141' ±10,164 ±24 Future Future 12,416' 12,429' 10,199' 10,212' 13 4/28/2009 Open 12,452' 12,465' 10,234' 10,247' 13 4/28/2009 Closed 11 12,465' 12,485' 10,247' 10,267' 20 4/27/2009 Closed NOTE:Angle @ Top Perforation=11°/Ref:SLB MD Log on 3/29/2009 1412 OPEN HOLE/CEMENT DETAIL 30" 260sx Arctis Set y �j:13 r 13 -3/8" 3,441 cu/ft Permafrost in a 17-1/4"Hole 9-5/8" 575 cu/ft Class"G"in a 12-1/4"Hole RA Tag @ 14 7" 1,663 cu/ft Class"G"in a 8-1/2"Hole/Tie Back Lnr CMT @ 8,516' 12,206 l° iiiit WELL INCLINATION DETAIL Max Angle is 58 deg.@ 8,312' r^ .' � ^ TREE&WELLHEAD t Tree 4-1/16CIW Wellhead FMC Plug wi10EndicotSands GENERAL WELL INFO Cerrent. TOC 0 API:50-029-21968-00-00 t 12444 c-. Drilled,Cased&Completed by Doyon 15 -9/20/1989 Sidetracked by Doyon 14-4/5/2009 r: Pull IBP-12/22/2013 4R� ,m P Set IBP-4/1/2014 A�' '4 r' Sluggits-4/8/2014 •' '• `' ` Pull Sluggits and IBP-8/2/2014 TD=12,603(MD)/TD=10,379'(TVD) SAFETY NOTE PBTD=12,512'(MD)/PBTD=10,293'(TVD) H2S Readings Average 230-260 PPM • on A/L&Gas Injectors/Well Requires a SSSV/Chrome Tubing&Liner Created By:TDF 9/2/2015 • REC Post Office Box 244027 I ! p Anchorage,AK 99524-4027 Hilcorp Alaska,LLC J U�_ 3 0 L 0 .I 3800 Centerpoint Drive Suite 100 AOGCCAnchorage,AK 99503 Phone: 907/777-8300 Fax: 907/777.-8301 July 29, 2015 Commissioner Cathy Foerster Alaska Oil & Gas Conservation Commission ©y d t Q 333 West 7th Avenue, Suite 100 / Anchorage, AK 99501 sc.RIViv, SEP 01 '9/6 Re: Duck Island Unit Well Renaming Request Dear Commissioner Foerster, Hilcorp Alaska, LLC (HAK) requests a change to the naming convention of Duck Island Unit wells to remove the unused suffixes at the end of each well name. Well names currently include a forward slash "I" followed by an obsolete bottom hole location designator. HAK would like to retain the well number as well as the "A, B, C...." sidetrack designations but remove the "/suffix". For example, "DUCK IS UNIT SDI 1-09A/L21" would become "DUCK IS UNIT SDI 1-09A". The attached spreadsheet includes original and new names for all Duck Island wells. While performing the review of Duck Island well names, HAK found a single well, "DUCK IS UNIT SDI 4-20/M35" (PTD# 1861730), that should also be modified to include an "A" label to reflect the fact that the well is a sidetrack from the original "DUCK IS UNIT SDI 4-20/T34" (PTD # 1861500). The original wellbore, abandoned 10/13/1986, was sidetracked to a new bottom hole location completed on 9/9/1987. This well appears to be one of the first sidetracks performed at Endicott. While the bottom hole code was changed, no letter was added to reflect the sidetrack. "DUCK IS UNIT SDI 4-20A" is also included on the attached spreadsheet. Sincerely, Wyatt Rivard Well Integrity Engineer Hilcorp Alaska, LLC CC Dave Roby Victoria Loepp iOrig • New API_WeliNo I PermitNumberl WellName WellNumber I I WellNumber 50029219460600 2032160 DUCK IS UNIT SDI 3-17F/K30 3-17F 50029224630000 1940490 DUCK IS UNIT SDI 3-19/R28 3-19 50029217140000 1870330 DUCK IS UNIT SDI 3-21/L34 3-21 50029217149500 1980190 DUCK IS UNIT SDI 3-21AK35XX 3-21AXX 50029216450000 1861550 DUCK IS UNIT SDI 3-23/N32 3-23 50029221250000 1901820 DUCK IS UNIT SDI 3-25/M27 3-25 50029221250100 2010200 DUCK IS UNIT SDI 3-25A/N24 3-25A 50029221250200 2030210 DUCK IS UNIT SDI 3-25B/L27 3-25B 50029215860000 1860830 DUCK IS UNIT SDI 3-27/M33 3-27 50029221060000 1901560 DUCK IS UNIT SDI 3-29/332 3-29 50029228380000 1972270 DUCK IS UNIT SDI 3-31/K32 3-31 50029216680000 1861800 DUCK IS UNIT SDI 3-33/K37 3-33 50029216680100 2032150 DUCK IS UNIT SDI 3-33A/J35 3-33A 50029217010000 1870200 DUCK IS UNIT SDI 3-35/L36 3-35 50029225540000 1950510 DUCK IS UNIT SDI 3-37/L35 3-37 50029217640000 1871160 DUCK IS UNIT SDI 3-39/339 3-39 50029217640100 1970910 DUCK IS UNIT SDI 3-39A/I37 3-39A 50029218780000 1881260 DUCK IS UNIT SDI 3-41/K39 3-41 50029224160000 1931700 DUCK IS UNIT SDI 3-43/P36 3-43 50029218110000 1880510 DUCK IS UNIT SDI 3-45/M39 3-45 50029215690000 1860640 DUCK IS UNIT SDI 3-47/Q35 3-47 50029217350000 1870600 DUCK IS UNIT SDI 3-49/340 3-49 50029217350200 1970570 DUCK IS UNIT SDI 3-49A/M40 3-49A 50029217359500 1950350 DUCK IS UNIT SDI 3-49AJ40XX 3-49AXX 50029217890000 1880220 DUCK IS UNIT SDI 4-02/Q28 4-02 50029219680000 1890860 DUCK IS UNIT SDI 4-04/T26 4-04 50029219680100 2090190 DUCK IS UNIT SDI 4-04A/T30 4-04A 50029217230000 1870430 DUCK IS UNIT SDI 4-06/Q32 4-06 50029217230100 1961660 DUCK IS UNIT SDI 4-06A/Q30 4-06A 50029216920000 1870080 DUCK IS UNIT SDI 4-08/P27 4-08 50029224640000 1940500 DUCK IS UNIT SDI 4-10/M28 4-10 50029224640100 2022380 DUCK IS UNIT SDI 4-10A/L28 4-10A 50029218630000 1881040 DUCK IS UNIT SDI 4-14/R34 4-14 50029218630100 2080120 DUCK IS UNIT SDI 4-14A/S-37 4-14A 50029218960000 1881490 DUCK IS UNIT SDI 4-18/S30 4-18 50029216400100 1861730 DUCK IS UNIT SDI 4-20/M35 4-20A 50029216400000 1861500 DUCK IS UNIT SDI 4-20/T34 4-20 50029218350000 1880720 DUCK IS UNIT SDI 4-26/034 4-26 50029218700000 1881110 DUCK IS UNIT SDI 4-28/N37 4-28 50029225590000 1950690 DUCK IS UNIT SDI 4-32/K38 4-32 50029227050000 1961550 DUCK IS UNIT SDI 4-34/038 4-34 50029224820000 1940740 DUCK IS UNIT SDI 4-38/K34 4-38 50029222650000 1920420 DUCK IS UNIT SDI 4-40/P43 4-40 50029217310000 1870560 DUCK IS UNIT SDI 4-42/P38 4-42 50029222540000 1920190 DUCK IS UNIT SDI 4-44/M44 4-44 50029222549500 1970470 DUCK IS UNIT SDI 4-44AM40XX 4-44AXX 50029219570000 1890690 DUCK IS UNIT SDI 4-46/N39 4-46 50029219720000 1890970 DUCK IS UNIT SDI 4-48/K43 4-48 50029219400000 1890440 DUCK IS UNIT SDI 4-50/K41 4-50 STATE OF ALASKA RECEIVED A, _KA OIL AND GAS CONSERVATION COMM-110N REPORT OF SUNDRY WELL OPERATIONS APR 2 8 2014 1.Operations Abandon L] Repair Well U Plug Perforations U Perforate U Other Ati Cii Performed: Alter Casing 111 Pull Tubing❑ Stimulate-Frac ❑ Waiver ❑ Time f-}ftf-vi l fChan e Approved Program ❑ Operat.Shutdown❑ Stimulate-Other ❑ Re-enter Suspended Wel❑ 2.Operator 4.Well Class Before Work: 5.Permit to Drill Number: BP Exploration(Alaska),Inc Name: Development Exploratory ❑ • 209-019-0 3.Address: P.O.Box 196612 Stratigraphic❑ Service ❑ 6.API Number: Anchorage,AK 99519-6612 " 50-029-21968-01-00 7.Property Designation(Lease Number): 8.Well Name and Number: ADL0047502 e. EPA 4-04A/T-30 9.Logs(List logs and submit electronic and printed data per 20AAC25.071): 10.Field/Pool(s): ' ENDICOTT,ENDICOTT OIL 11.Present Well Condition Summary: Total Depth measured . 12600 feet Plugs measured 12423 feet true vertical 10378.95 feet Junk measured None feet Effective Depth measured • 12423 feet Packer measured See Attachment feet true vertical 10206.12 feet true vertical See Attachment feet Casing Length Size MD TVD Burst Collapse Structural None None None None None None Conductor 80 20"x 30" 39-119 39-119 0 0 Surface 2462 13-3/8"68#L-80 38-2500 38-2500 5020 2260 Intermediate 8698 9-5/8"47#NT95HS 37-8735 37-6882.73 8150 5080 Production 8457 7"26#L-80 36-8493 36-6752.7 7240 5410 Liner See Attachment See Attachment See Attachment See Attachment See Attachment See Attachment Perforation depth Measured depth 12205-12229 feet 12260-12282 feet 12294-12316 feet 12337-12357 feet 12421-12433 feet 12433-12434 feet 12457-12470 feet 12470-12490 feet True Vertical depth 9992.66-10016.19 feet 10046.58-10068.1:feet 10079.89-10101.43 feet 10121.99-10141.5 feet 10204.16-10215.8E feet 10215.89-10216.8 feet 10239.34-10252.0,feet 10252.04-10271.58 feet Tubing(size,grade,measured and true vertical depth) 4-1/2"12.6#13Cr80 35-12107 35-9896.5 Packers and SSSV(type,measured and true vertical depth) See Attachment See Attachment See Attachment Packer None None None SSSV 12.Stimulation or cement squeeze summary: Intervals treated(measured): REIDMs4ij MAY 1 2014 Treatment descriptions including volumes used and final pressure: H I SCANNED JUN 1 1 2014 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure IPrior to well operation: 13 11 1070 1801 299 Subsequent to operation: 29 25 2650 1884 318 14.Attachments: 15.Well Class after work: Copies of Logs and Surveys Run Exploratory❑ Development 0 • Service❑ Stratigraphic ❑ Daily Report of Well Operations X 16.Well Status after work: Oil • ❑✓ Gas ❑ WDSPLU GSTOR ❑ WINJ ❑ WAG ❑ GINJ ❑ SUSP ❑ SPLUCJ 17.I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O.Exempt: N/A Contact Nita Summerhays Email Nita.Summerhays(U�bp.com Printed Name Nita Summerh- / Title Data Coordinator ....� M__. -'" Phone 564-4035 Date 4/28/2014 Sign-...., ;,'.�� .,�41° �L _..__--_ �.- 4 142,3 Form 10-404 Revised 10/2012 Submit Original Only Daily Report of Well Operations ADL0047502 ACTIVITYDATE SUMMARY ***WELL S/I ON ARRIVAL*** SPOT IN EQUIP & PREP FOR JOB. DEPART LCTN. 3/9/2014 ***JOB CONTINUED ON 3/10/14 WSR*** ***WELL S/I ON ARRIVAL*** (profile Mod) DRIFT W/3.25" CENT, TEL, SAMPLE BAILER, LOC TT @ 12102' SLM, 12107' MD (5' CORRECTION). TAG BOTTOM @ 12478' SLM, 12,483' MD 2' FILL IN BOTTOM PERF. CURRENTLY IN HOLE W/ PDS 40 ARM CALIPER. 3/10/2014 ***JOB CONTINUE ON 3/11/14*** ***JOB CONTINUED FROM 3/10/14***(profile Mod) LOG FROM 12,448' SLM, TO SURFACE. GOOD DATA 3/11/2014 ***JOB COMPLETE TURNED WELL OVER TO DSO*** T/I/0=2000/2133/130/0 Temp=S/I Assist E-line (Profile modification) Pumped a 5 bbl meth spear followed by 76 bbls 130* 1% kcl. SD do to mechanical issues, freeze protected tbg with 10 bbls meth. RDMO road to shop. Final WHP's 1098/2258/135/0 E- 3/31/2014 line on well at departure ***WELL SHUT IN ON ARRIVAL*** (ELINE XFLOW IBP) INTIAL T/I/O/O =2000/2000/150/0 RIH TO BOTTOM WHILE LRS BEGINS TO PUMP. LRS TRUCK HAS MECHANICAL PROBLEMS. SEND FOR NEW TRUCK. 3/31/2014 ***JOB CONTINUED ON 1-4-2014*** T/I/0=1950/180/135 Assist E-Line (Set IBP) Loaded Tbg. w/5 bbl meth spear, 290 bbls 1% KCL. Freeze protected W/ 10 bbls Methanol. Well started to come back, pumped an additional 2 bbls neat spear and 180 bbls of Inhib. 1% kcl. Followed by a 12 bbl neat meth tubing freeze protect. Final WHP -670/1750/135/185. E-Line on well at 4/1/2014 departure. ***JOB CONTINUED FROM 31-MAR-2014*** (ELINE XFLOW/SET IBP) LRS PUMP 290 BBL KCL TO LOAD/KILL WELL. LOG 40 AND 60 FPM UP/DOWN PASSES &STOP COUNTS TO LOOK FOR CROSSFLOW (CROSS FLOWING OBSERVED) (TBG PSI HAD CLIMBED TO 1400# DURING CROSS FLOW CHECK SO DECISION MADE TO RELOAD BEFORE SETTING IBP) LRS LOADED TBG W/AN ADDITIONAL 180 BBLS KCL RIH W/ HEAD/ERS/BAKER 3 3/8" IBP (TD TAGGED @ 12506') SET BAKER 3 3/8" CROSSFLOW IBP @ 12458' MID ELEMENT(TOP SET @ 12451') (SPECS = 1.75" FISHING NECK, / 13.44' OAL/3-3/8" MAX OD [2 X 6" ELEMENTS/ 1" STIFFENER RING] --THESE DEPTHS ARE CORRELATED TO SLB MEMORY JEWELRY LOG DATED 9-MAY-2009 WHICH IS OFF DEPTH FROM PERF RECORDS AND REF LOG (SEE NOT BELOW) **** NOTE: PER REF LOG = SLB MEASURED DEPTH LOG DATED 29-MARCH-2009 PUTS IBP IS SET © 12440' MID ELEMENT ISOLATING PERF INTERVALS 12452'TO 12485' -- THIS PUTS THE TOP © 12433 PER REF LOG DEPTHS **** WELL SHUT IN ON DEPARTURE - DSO NOTIFIED OF WELL STATUS FINAL T/I/O/O = 900/1400/120/0 4/1/2014 ***JOB COMPLETE*** ***WELL S/I ON ARRIVAL*** (profile mod) R/U SWCP 4520 4/5/2014 ***WSR CONT ON 4/6/14*** • Daily Report of Well Operations ADL0047502 ***WSR CONT FROM 4/5/14****(profile mod) RUN 3.685" CENT, 2' 1-7/8" STEM, 3.61" CENT, 3.5" LIB,S/D @ 12,418' SLM, 12,433' MD, GOOD IMPRESSION OF IBP F/N MADE 6 RUNS W/3.5"X 11'4" DUMP BAILER, 1-3/4" KNUCKLE JARS, 3.5" " CENT, BULL NOSE (oal = 173"), DUMP 10' OF SLUGGITS @ 12,418' SLM 4/6/2014 ***WSR CONT ON 4/7/14*** ***WSR CONT FROM 4/6/14*** RUN 3.68" CENT, 3' 1-7/8" STEM, 3.60" CENT, 4-1/2" TEL, 3.5" LIB, LOC TT @ 12,091' SLM / 12,107' MD (+ 16' CORRECTION) & S/D @ 12,414, SLM SET 4-1/2" BBE (60" oal, sec. lock down, ser. NBB-04)AT 1496' SLM/ 1509' MD UNABLE TO GAIN CONTROL LINE INTEGRITY PULL 4-1/2" BBE (60" oal, sec. lock down, ser. NBB-04) FROM 1496' SLM/ 1509' MD SET 4-1/2" BBE (60" oal, sec. lock down, ser. NBB-33) @ 1496' SLM/ 1509' MD 4/7/2014 ***WSR CONT ON 4/8/14**** ***WSR CONT FROM 4/7/14***(profile mod) PREFORM PASSING DRAW DOWN TEST, WELL TENDER PRESENT R/D SWCP 4520 4/8/2014 ***WELL S/I ON DEPARTURE WELL TENDER NOTIFIED*** FLUIDS PUMPED BBLS 4 DIESEL 44 METH 546 1% KCL 594 TOTAL m Q, 000000 m ao cd 0 O t N 10 LO i in N U N O O O o 0 0 in V' V N CO N N N O V CO CO N N 10 CO f� N N 10 N NM in O co O d) O N d) I I I H N d) N- N nj CO O 10 CO M ' Lo CO CO CO CO C a� N aO 0 0 0 00 (Ni C.) 4-1 Q CY) N la Lo D) � MM V OMMcO C CO M (/) o Q = 0 00 0 0 rn0eoo U C � MZ � MIo4* •� Al X (C) o N N00 x- C0 I� N (, M d) +-' 00 d) co � N CD 0 d) LO V 10 CO C CO CO CO N V V r,IO J CO N CO N Q z 0 On— 121 Lu rx (21 I i Z U z W w w O m 01— z z D 0 Z J J d U) Packers and SSV's Attachment ADL0047502 SW Name Type MD TVD Depscription 4-04A/T-30 PACKER 8516 6716.88 7" Baker ZXP Top Packer 4-04A/T-30 PACKER 12020 9763 4-1/2" Baker S-3 Perm Packer f IEEE- 4-1/16"CMV WELLHEAD FMC E N D4-04A PPM NOTES:H2S TO AVGE 230-260 WELL RBQUFtESA ACTUATOR= BAKER C SSSV'""CHROME TBG&LW***SEE PG.2 FOR OKB.H-EV= 54.70' I PREVIOUS WELBORE*"* BF.BEV= 16.25' .CONDUCTOR --IKOP- _D= "? 1509' --14-1/2"FES HXO SV LN(X MORE),ID=3.813" Max Angle= 58°@ 8312 — Datum MD= 12262 GAS LFT MANDRELS Datum ND= 10000 SS ST MD 1,4'1) DEV TYPE VLV LATCH PORT DATE 13-3/8'CSG,68#,L-80 BUTT,D=12.415" —I 2500' L 5 3546 3515 21 KBG2 DOME BK 16 05/09/09 4 7139 6003 55 KBG2 DOME BK 16 05/09/09 Minimum ID = 3.725" @ 12085' 3 9762 7605 28 KBG2 DOME BK 16 05/09/09 4-1/2" HES X N NIPPLE 2 11004 8810 10 KBG2 SO BK 24 06/16/09 1 11911 9704 11 KBG2 DM( BK 0 06/16/09 r TIEBACK LW,26#,L-80 TCI, — 8493' 8514' —I 7.TIEBACK SEAL ASSY,D=9.23" .0383 bpf,ID=6.276' ..7:4I8516' —9-5/8"X 7"HRD ZXP LTP w/TACK SEAL 9-5/8"WHIPSTOCK(03/22/09) --I 8728' a ASSY &FLEXLOCK LNR HGR,D=6.23" 9-5/8"CSG,47#,NT80HS NSCC,D=8.861" H —8735 ^� s• 9-5/8"MLLOUT WINDOW(B404-04A) 8728'-8735' 7"LNR,26#,L-80 HY D521 H 11352' IX XO TO 13CR-80 HYD 521 I 11990' —14-1/2"HES X NP,D=3.813' ICI Er12020' —17"X 4-1/2'BKR S-3 PKR,D=3.875" I ' 12054' —1 4-1/2"HES X NP,D=3.813" 4-1/2"TBG,12.6#,13CR-80 VAMTOP, — 12107' I I 12085' —14-112'FES XN NP,D=3.725" .0152 bpf,ID=3.958" N 12107' —{4-1/2"WLEG,D=3.958" PERFORATION SUMMARY 12111'ELMD REF LOG:SIB MD LOG ON 03/29/09 ANGLE AT TOP FERE 11°@ 12200' ' 12206' —RA TAG IN 7"LNR Note:Refer to Production DB for historical perf data SIZE SPF INTERVAL Opn/Sgz SHOT SQZ I 3-3/8" 6 12200-12224 0 04/29/09 3-3/8' 6 12255-12277 0 04/28/09 ' 12423' --I SLUGGITS(04/08/14) 3-3/8" 6 12289-12311 0 04/28/09 I 3-3/8' 6 12332-12352 0 04/27/09 �� 12433' H 3-3/8"BKR BP(04/01/14) % 3-3/8' 6 12416-12429 0 04/28/09 3-3/8' 6 12452-12465 C 04/28/09 3-3/8' 6 12465-12485 C 04/27/09 ...... PBTD H 12512' 7"LNR,26#,13CR-80 HYD 521,.0383 bpf,D=6.276' H 12598' DATE REV BY COMvE4TS DATE REV BY COMMENTS NITS 81XDTT UNIT 09/20/89 D15 ORIGINAL COMPLETION 04/10/14 TBDIJMD SLUGGITS(04/08/14) WELL: 4-04A/T-30 04/05/09 D14 SIDETRACK(BND4-04A) PERMIT No: 2090190 02/17/11 M3/JMD ADDED SSSV SAFLIY NOTE API No: 50-029-21968-01 08/15/11 DW/JMD ADDED F2S SAFETY NOTE SEC 8,T11N,R17E,2577'FSL&845'FR 02/10/14 WKP/JMD PULLED BP(12/22/13) 04/02/14 JON PJC SETBP(04/01/14) BP Exploration(Alaska) • • bp BP Exploration (Alaska) Inc. Attn: Well Integrity Coordinator, PRB -20 Post Office Box 196612 Anchorage, Alaska 99519 -6612 May 22, 2012 Mr. Jim Regg _ © l 9 Alaska Oil and Gas Conservation Commission © i — Q 333 West 7 Avenue Anchorage, Alaska 99501 ) 1 Subject: Corrosion Inhibitor Treatments of Endicott Row 4 Dear Mr. Regg, Enclosed please find multiple copies of a spreadsheet with a list of wells from Endicott Row 4 that were treated with corrosion inhibitor in the surface casing by conductor annulus. The corrosion inhibitor is engineered to prevent water from entering the annular space and causing external corrosion that could result in a surface casing leak to atmosphere. The attached spreadsheet represents the well name, API and PTD numbers, top of cement depth prior to filling and volumes of corrosion inhibitor used in each conductor. As per previous agreement with the AOGCC, this letter and spreadsheet serve as notification that the treatments took place and meet the requirements of form 10 -404, Report of Sundry Operations. If you require any additional information, please contact me or my alternate, Gerald Murphy, at 659 -5102. Sincerely, Mehreen Vazir BPXA, Well Integrity Coordinator • • BP Exploration (Alaska) Inc. Surface Casing by Conductor Annulus Cement, Corrosion inhibitor, Sealant Top-off Report of Sundry Operations (10-404) Endicott Row 4 Date: 10/07/10 Corrosion Initial top of Vol. of cement Final top of Cement top off Corrosion inhibitor/ Well Name PTD # API # cement pumped cement date inhibitor sealant date ft bbls ft na gal END4 -02 / 0-28 1880220 50029217890000 0.3 NA 0.3 NA 1.70 9/29/2010 �-✓ END4-04 / T-30 2090190 50029219680100 4 2.0 0.8 9/2/2010 3.40 9/29/2010 END4-06A / 0-30 1961660 50029217230100 4 3.0 0.1 9/6/2010 2.55 9/30/2010 END4 -08 / P -27 1870080 50029216920000 5 3.0 0.8 9/2/2010 6.00 9/30/2010 END4 -10A / L -28 2022380 50029224640100 15 12.5 0.5 9/6/2010 1.70 9/30/2010 END4-14A / S-37 2080120 50029218630100 0.3 NA 0.3 NA 1.70 9/30/2010 END4-181 S -30 1881490 50029218960000 7 2.0 0.8 _ 9/2/2010 4.30 9/30/2010 END4 -20 / M-35 1861730 50029216400100 1.5 0.5 0.4 9/6/2010 2.55 10/4/2010 END4-26 / 0-34 1880720 50029218350000 1.2 NA 1.2 NA 10.20 10/4/2010 END4-28 / N -37 1881110 50029218700000 2 1.0 0.5 9/6/2010 3.40 10/4/2010 END4 -32 / K -38 1950690 50029225590000 6 6.0 0.7 9/2/2010 6.80 10/4/2010 END4-34 / 0-38 1961550 50029227050000 4 1.0 0.3 9/6/2010 1.70 10/4/2010 END4 -38 / K -34 1940740 50029224820000 10 7.0 0.3 9/6/2010 1.70 10/4/2010 END4 -40 / P-43 1920420 50029222650000 1.5 0.3 0.4 9/6/2010 3.40 10/4/2010 END4 -42 / P -38 1870560 50029217310000 0.5 NA 0.5 NA 3.40 10/4/2010 END4 -44 / M-44 1920190 50029222540000 1.5 0.3 0.5 9/6/2010 1.70 10/4/2010 END4 -46 / N -39 1890690 50029219570000 3 2.5 0.8 9/6/2010 5.10 10/4/2010 END4 -48 / K-43 1890970 50029219720000 4 2.0 0.8 9/6/2010 5.10 10/4/2010 END4-50 / K-41 1890440 50029219400000 1.3 0.1 0.3 9/6/2010 1.70 10/4/2010 DATA SUBMITTAL COMPLIANCE REPORT 9/27/2011 Permit to Drill 2090190 Well Name /No. DUCK IS UNIT SDI 4- 04A/T30 Operator BP EXPLORATION (ALASKA) INC API No. 50- 029 - 21968 -01 -00 MD 12600 TVD 10379 Completion Date 4/27/2009 Completion Status 1 -OIL Current Status 1 -OIL UIC N REQUIRED INFORMATION Mud Log No Samples No Directional Survey 'Yes DATA INFORMATION Types Electric or Other Logs Run: DIR, GR, RES, PWD, NEU, DEN, IFR / Casandra, USIT (data taken from Logs Portion of Master Well Data Maint Well Log Information: Log/ Electr Data Digital Dataset Log Log Run Interval OH / • Typ Med /Frmt Number Name Scale Media No Start Stop CH Received Comments og Cement Evaluation 5 Col 0 12511 Case 5/15/2009 SCMT CBL and PDC log,' 1 GR< CCL, Pres, Temp 27- Apr -2009 ,✓ED C Pds 18006 Cement Evaluation 0 12511 Case 5/15/2009 SCMT CBL and PDC log, GR< CCL, Pres, Temp 27- Apr -2009 ' D C Lis 18099 / Gamma Ray 1 12505 Open 6/3/2009 LIS Veri, GR D C Lis 18232 1 Gamma Ray 1 12505 Open 7/6/2009 LIS Veri, GR REVISED D C Lis 18241 Tduction /Resistivity 8728 12586 Open 7/6/2009 LIS Veri, GR, ROP, FET, RPX, RPM, RPD, RAM, DRHO, NPHI, TRPM og Induction /Resistivity 25 Blu 8628 12566 Open 7/6/2009 MD Scope Service log Induction /Resistivity 25 Blu 8628 12566 Open 7/6/2009 TVD Scope Service - Pr re V/, a,., „' I , - 8, t 4— 5 Blu 12160 12482 Case 7/27/2009 PPL w /Deft, GR, CCL, Pres, Temp, Dens, Spin 30- Jun -2009 ../ 6 C Pds 18372 " e Pro , 1.-t J y Vir-j A t 12160 12482 Case 7/27/2009 PPL w /Deft, GR, CCL, Pres, Temp, Dens, Spin 30- Jun -2009 D C Asc Directional Survey 0 12600 Open pt Directional Survey 0 12600 Open Well Cores /Samples Information: Sample Interval Set Name Start Stop Sent Received Number Comments DATA SUBMITTAL COMPLIANCE REPORT 9/27/2011 Permit to Drill 2090190 Well Name /No. DUCK IS UNIT SDI 4- 04A/T30 Operator BP EXPLORATION (ALASKA) INC API No. 50- 029 - 21968 -01 -00 MD 12600 TVD 10379 Completion Date 4/27/2009 Completion Status 1 -OIL Current Status 1 -OIL UIC N ADDITIONAL INFORMATION Well Cored? Y / N Daily History Received? LJ N Chips Received? — Y-Fib" Formation Tops 6/ N Analysis Received? Comments: • Compliance Reviewed By: Date: `_ 07/20/09 Schimberger ,,Na 53-19 Alaska Data & Consulting Services Company: State of Alaska 2525 Gambell Street, Suite 400 Alaska Oil & Gas Cons Comm Anchorage, AK 99503 - 2838 Attn: Christine Mahnken ATTN: Beth 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Well Job # Log Description Date BL Color CD 4- 04A/T -30 AYTO -00023 PRODUCTION PROFILE )(`f -, -- 0 (9 ( a 06/30/09 1 1 L3 -31 AXBD -00030 MEM INJECTION PROFILE (p - (p / ifs- / 07/01/09 1 1 SF SU G -31B ANHY -00100 LDL _t ( 07/07/09 1 1 _ Z -32BL1 AV1H -00018 SBHP RVEY j' - I3 1: 07/02/09 1 1 14 -10 AY3J -00033 PRODUCTION PROFILE / / - /10 / 3(45 07/01/09 1 1 A -20 AV1H-00021 SBHP SURVEY /ta -- ( 3 / kA ( 07/07/09 1 1 01 -30 AY3J -00034 LDL (5 r , /K( - 1/ ( / '� 07/04/09 1 1 M-26A BOCV -00021 PRODUCTION LOG ( - 15 it) 7 �' 07/12/09 1 1 06 -23C AXBD -00031 MEMORY PROD PROFILE -090 1 Nei 07/03/09 1 1 L3 -31 BOCV -00019 PRODUCTION LOG / j�l - ()3C{ /'�, - 3( Q Q 07/09/09 1 1 L2 -20 AYKP -00031 LDL / $$"-- /3W /`j 07/10/09 1 1 E -09B _ B04C -00064 SCMT !(`-) / / / '3 (5 07/01/09 1 1 _ 04 -33 AY3J -00036 USIT ( 035 / 07/07/09 1 1 WGI -07 BOCV -00020 USIT - oa � 07/11/09 1 1 _ 1- 31/M -21 814B -00063 PRODUCTION PROFILE • ( q - Q'? _ /4 06/16/09 1 1 L3 -02 AZCM -00028 RST alZe, - G - 1- 06/15/09 1 1 1- 31/M -21 B14B -00063 RST 1 5- (S 3 /i '.5 -t 06/17/09 1 1 18 -18B ANHY -00097 RST Ong - t a l 1 15-36 --- 5 - 06/09/09 1 1 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO: BP Exploration (Alaska) Inc. Alaska Data & Consulting Services Petrotechnical Data Center LR2-1 4 Gambell Street, Suite 400 900 E. Benson Blvd. Anchorage, AK 99503 -2838 SChluMberger j N0.5289 06/26/09 Alaska Data & Consulting Services Company: State of Alaska 2525 Gambell Street, Suite 400 Alaska Oil & Gas Cons Comm Anchorage, AK 99503 -2838 Attn: Christine Mahnken ATTN: Beth 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Well Job # Log Description Date BL Color CD A -44 09AKA0048 OH MWD /LWD EDIT U-±L►. f\ --py a /'� 04/26/09 2 1 4- 04A/T -30 09AKA0040 OH MWD /LWD EDIT�/C3 -. / q / i 0. tai 03/28/09 2 1 18 -01A B2WY -00003 MCNL LC) ( 0 /* 04/30/09 1 1 15-29B 09AKA0143 OH MWD /LWD EDIT ,....)061 -()3 / „ :3 ( /6 05/30/09 2 1 05 -35A 40017778 OH MWD /LWD EDIT Q0 S- - /'{y % 03b- 09/10/08 2 1 V -115L2 11962618 OH WIRELINE ,...X•15' - 1 f U I ��? 08/22/08 1 1 MPS -41 11966289 OH WIRELINE a'1 c-- /59 /`>f33 11/19/08 6 1 G -01A BOOR -00006 MCNL /93 L. lli_' 1-k - 04/01/09 1 1 v 4- 04A/T -30 BOCV -00014 CH EDI, ra,.. -GR (SCMT) (REVISE DATA)A(fj - act 1670- 04/27/09 1 05 -35A AWJI -00008 CH EDIT PDCL -GR (MEM CORRELATION)a - / /47' 1 07 -14B AYQQ -00029 CH EDIT PDCL -GR (LDL) - /G / j li b 05/26/09 1 L3 -08 AWL9 -00028 RST / $:? - /y3 /1- ,".3(f 06/11/09 1 1 110 1 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO: BP Exploration (Alaska) Inc. Alaska Data & Consulting Services Petrotechnical Data Center LR2 -1 2525 Gambell Street, Suite 400 900 E. Benson Blvd. Anchorage, AK 99503 -2838 06/26/09 • Schlumberger NO. 5289 • Alaska Data & Consulting Services Company: State of Alaska 2525 Gambell Street, Suite 400 Alaska Oil & Gas Cons Comm Anchorage, AK 99503 -2838 Attn: Christine Mahnken ATTN: Beth 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Well Job # Log Description Date BL Color CD A -44 09AKA0048 OH MWD/LWD EDIT jJ';* (rt 1 / n -04 /Vag/ 04/26/09 2 1 4- 04A/T -30 09AKA0040 OH MWD /LWD EDIT,3/1g —/)/ 0 [j� 03/28/09 2 1 10 18 -01A B2WY -00003 MCNL !� c / c p 4 , 04/30/09 1 1 15 -29B 09AKA0143 OH MWD /LWD EDIT ,00(1 —Q3 / ,S ( 05/30/09 2 1 05 -35A 40017778 OH MWD/LWD EDIT QUS" - /`j2/ / D3 b- 09/10/08 2 1 V -115L2 11962618 OH WIRELINE ,.Xfis — H I V 1 /5 08/22/08 1 1 MPS -41 11966289 OH WIRELINE dl2c— /' _ 33 11/19/08 6 1 G -01A BOOR -00006 MCNL / — J - 04/01/09 1 1 4- 04A/T -30 BOCV -00014 CH EDI r rvvi -GR (SCMT) (REVISE DATA)' — 1 i t " /27/09 1 05 -35A AWJI -00008 CH EDIT PDCL -GR (MEM CORRELATION) apb.- /V /WI 12/03/08 1 07 -148 AY0Q -00029 CH EDIT PDCL -GR (LDL)401'3 —,L/ j ` a3b 05/26/09 1 L3 -08 AWL9-00028 RST t 6 - /6//3 /11 06/11/09 1 1 lb PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO: BP Exploration (Alaska) Inc. Alaska Data & Consulting Services Petrotechnical Data Center LR2 -1 2525 Gambell Street, Suite 400 900 E. Benson Blvd. Anchorage, AK 99503 -2838 liiiiip 05/26/09 Schhimbener NO. 5242 Alaska Data & Consulting Services Company: State of Alaska 2525 Gambell Street, Suite 400 Alaska Oil & Gas Cons Comm Anchorage, AK 99503 -2838 Attn: Christine Mahnken ATTN: Beth 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Well Job # Log Descri tion Date BL Color CD • i 4- 04A/T -30 BOCV -00014 CH EDIT PDCL -GR (SCMT) Q /G} /d-)9 04/27/09 >4 1 4- 02/0 -28 AYKP -00019 RST 1�j' 0 11,1 --(19., lvr9V 05/07/09 1 1 H -19B B2WY-00004 MCNL i • • .••., • • , . • • ' 7/ 1 1 / 18 -26B B2NJ -00001 MCNL r ,'�j'�— ga / t Ma 04/14/09 1 1 A- J -20B AXBD -00020 MCNL >��y�_� 04/12/09 1 1 r W -O6A AZCM -00021 RST +ty4 _(a(.( i ( p j l i , 05/16/09 1 1 15 -15C BOOR -00004 MCNL % _ P - t 2 03/15/09 1 1 14-31 BOCV- 000015 RST /�� — // 1 1 % 05/15/09 - 1 1 - E -05B 09AKA0035 OH MWD /LWD EDIT n _ h a ( /'j 04/06/09 2 1 06 -14B 09AKA0031 OH MWD /LWD EDIT 00,0 _0( p / IfA99 03/27/09 2 1 6 . PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO: BP Exploration (Alaska) Inc. Alaska Data & Consulting Services Petrotechnical Data Center LR2 1 �? � l i �.'�" C�- I. Anchorage, AK 9 • . � 3 -28 �� 2525 Gambell Street, Suite 900 E. Benson Blvd. } r �* Anchorage, Alaska 99508 ATTN: Beth i Date Delivered: ,ILIN 0 3 2009 Received by: • Wr ' ()ii I . tilr�nnissi ®� AnchG 0t8 STATE OF ALASKA I ALASKA._ AND GAS CONSERVATION COM SION 2 1 2009 4. WELL COMPLETION OR RECOMPLETION REPORT AND LOG '5.1446' � Alaska Oil & Gas Cons, Commission la. Well Status: ►=4 Oil ❑ Gas ❑ Plugged ❑ Abandoned ❑ Suspended 1 b. Well ClassnChora 6 20AAC25.105 20AAC25.110 ® Development LJ Exploratory ❑ GINJ ❑ WINJ ❑ WDSPL ❑ WAG ❑ Other No. of Completions ❑ Service ❑ Stratigraphic 2. Operator Name: 5. Date Comp., Susp., or Aband. 12. Permit to Drill Number BP Exploration (Alaska) Inc. 4/29/2009 209 -019 - 3. Address: 6. Date Spudded 13. API Number P.O. Box 196612, Anchorage, Alaska 99519 -6612 3/24/2009 / 50- 029 - 21968 -01 -00 - 4a. Location of Well (Governmental Section): 7. Date T.D. Reached 14. Well Name and Number: Surface: 3/28/2009 i END 4 - 04A/T - 2702' FNL, 846' FEL, SEC. 08, T11 N, R17E, UM Top of Productive Horizon: 8. KB (ft above MSL): 48.05' 15. Field / Pool(s): - 3748' FSL, 76' FEL, SEC. 07, T11 N, R17E, UM Ground (ft MSL): 14.50' Endicott Field / Endicott Pool Total Depth: 9. Plug Back Depth (MD +TVD) 3744' FSL, 5273' FEL, SEC. 08, T11 N, R17E, UM 12512 10293 4b. Location of Well (State Base Plane Coordinates, NAD 27): 10. Total Depth (MD +TVD) 16. Property Designation: Surface: x- 270192 y- 5970797 Zone- ASP3 12600 10379 ADL047502 TPI: x- 265716 y- 5972107 Zone- ASP3 11. SSSV Depth (MD +TVD) 17. Land Use Permit: Total Depth: x- 265799 y- 5972100 Zone- ASP3 None 18. Directional Survey ®Yes ❑ No 19. Water depth, if offshore 20. Thickness of Permafrost (TVD): (Submit electronic and printed information per 20 AAC 25.050) N/A ft MSL 1465 (Approx.) 21. Logs Obtained (List all logs here and submit electronic and printed information per 20 AAC 25 711 DIR, GR, RES, PWD, NEU, DEN, IFR / Casandra, USIT /0A/z,)&73,0?? a r 7 9 rya 22. CASING, LINER AND CEMENTING RECORD CASING SETTING DEPTH MD SETTING DEPTH TVD HOLE AMOUNT WT. PER FT. GRADE To BOTTOM To BOTTOM SIZE CEMENTING RECORD PULLED 30" Structrual Surface 110' Surface 110' N/A —260 sx Arctic Set 13 -3/8" 68# NT -80 Surface 2500' Surface 2496' 17 -1/2 3441 cu ft Permafrost 9 -5/8" 47# NT8OS / NT95HS Surface 8728' Surface , 6879' 12-1/4 575 cu ft Class 'G' 7" 26# L-80 / 13Cr -80 Surface 12598' Surface 10377' 8-1/2" 590 cu ft Extended 'G'. 197 cu ft 'G'. 876 cu ft 'G' --' 'i! ui_ b c k /. K t.' c.. (b. B5 /lo' AID 4- 23. Open to production or injection? ® Yes ❑ No 24. TUBING RECORD If Yes, list each interval open SIZE DEPTH SET (MD) PACKER SET (MD) (MD +TVD of Top & Bottom; Perforation Size and Number): 3 -3/8" Gun Diameter, 6 SPF 4 -1/2 ", 12.6#, 13Cr80 12107' 12020' MD TVD MD TVD 12200' - 12224' 9988' - 10011' 25. ACID, FRACTURE, CEMENT SQUEEZE, ETC. 1 2255' - 12277' 10042' - 10063' 12289' - 12311' 10075' - 10097' DEPTH INTERVAL (MD) I AMOUNT & KIND OF MATERIAL USED 12332' - 12352' 10117' - 10137' Freeze Protected with 10 Bbls of Diesel 12416' - 12429' 10199' - 10212' 12465' - 12485' 10247' - 10267' 26. PRODUCTION TEST Date First Production: Method of Operation (Flowing, Gas Lift, etc.): Date of Test: Hours Tested: PRODUCTION FOR OIL -BBL: GAS -MCF: WATER-BBL: CHOKE SIZE: GAS -OIL RATIO: 5/14/2009 4 TEST PERIOD 4 70 325 174 0 4639 Flow Tubing Casing Press: CALCULATED OIL -BBL: GAS-MCF: WATER -BBL: OIL GRAVITY -API (CORR): Press. 876 2150 24 - HOUR RATE 420 1950 1044 27. CORE DATA Conventional Core(s) Acquired? ❑ Yes ® No Sidewall Core(s) Acquired? ❑ Yes ® No If Yes to either question, list formations and intervals cored (MD +TVD of top and bottom of each), and summarize lithology and presence of oil, gas or water (submit separate sheets with this form, if needed). Submit detailed descriptions, core chips, photographs and laboratory analytical results per 20 AAC 250.071. None s • II w BFL MAY 2 71009 , ,s, ¢i ° ' . . < i Form 10 -407 Revised 02/2007 • CONTINUED ON REVERSE SIDE • I 28. G EOLOGIC MARKERS (LIST ALL FORMATIONS AND MARKERS ENCOUNTERED): 29. FORMATION TESTS NAME MD TVD Well Tested? ❑ Yes ® No Permafrost Top If yes, list intervals and formations tested, briefly summarizing test results. Attach separate sheets to this form, if needed, and submit Permafrost Base detailed test information per 20 AAC 25.071. CM3 9340' 7264' Top SEABEE / Colville Sands None Top TUFF (SEABEE) 11016' 8822' Top Horizon 11655' 9452' Bottom Horizon 11910' 9703' LCU 11926' 9719' Top Kekiktuk (FV) 12196' 9984' FIV / Top Flow Unit 4 12261' 10048' FIII / Top Flow Unit 3 12344' 10129' FII / Top Flow Unit 2 12408' 10191' Fl / Top Flow Unit 1 12535' 10316' Formation at Total Depth (Name): Fl / Top Flow Unit 1 12535' 10316' 30. List of Attachments: Summary of Daily Drilling Reports, Well Work Summary, Well Schematic Diagram, Surveys and a Leak -Off Test Summary. 31. I hereby certify t. - - • r ing is-tFue n d correct to the best of my knowledge. 1 21 (5/ Signed Sondra Stewman � % .,,,. Title Drilling Technologist Date i r ) END 4- 04A/T -30 209 -019 Prepared By Name/Number Sondra Stewman, 564 - 4750 Well Number Permit No. / Aooroval No. Drilling Engineer: Paul Hanson, 564 -4195 INSTRUCTIONS GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. ITEM la: Classification of Service Wells: Gas Injection, Water Injection, Water - Alternating -Gas Injection, Salt Water Disposal, Water Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. ITEM 4b: TPI (Top of Producing Interval). ITEM 8: The Kelly Bushing and Ground Level elevation in feet above mean sea level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. ITEM 13: The API number reported to AOGCC must be 14 digits (ex: 50- 029 - 20123- 00 -00). ITEM 20: Report true vertical thickness of permafrost in Box 20. Provide MD and TVD for the top and base of permafrost in Box 28. ITEM 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. ITEM 23: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). ITEM 26: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut -In, or Other (explain). ITEM 27: Provide a listing of intervals cored and the corresponding formations, and a brief description in this box. Submit detailed description and analytical laboratory information required by 20 AAC 25.071. ITEM 29: Provide a listing of intervals tested and the corresponding formation, and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Form 10 -407 Revised 02/2007 Submit Original Only TREE = CIW J ill WELLHEAD = FMC SA NOTES: ** *CHROME TBG & JEWELRY* ** ACTUATOR = BAKER C EN = FMC E RT. ELEV = 54.70' BF. ELEV = 16.25' 1 KOP = 1509' H 4-1/2" HES HXO SVLN, ID = 3.813 " Max Angle = 58° @ 8312' DRAFT DRLS Datum MD = 12262' GAS LIFT MANDRELS Datum TVD = 10000' SS ST MD TVD DEV TYPE VLV LATCH PORT DATE IP 5 3546 3515 21 KBG -2 DOME BK 16 05/09/09 4 7139 6003 55 KBG -2 DOME BK 16 05/09/09 13 -3/8" CSG, 68 #, L -80 BUTT, ID = 12.415" H 2500' 3 9762 7605 28 KBG -2 DOME BK 16 05/09/09 2 11004 8810 10 KBG -2 DOME BK 16 05/09/09 1 11911 9704 11 KBG -2 SO BK 24 05/09/09 Minimum ID = 3.725" @ 12085' •o ,z56 bb�ff k /5Lo t3r4'- •C7' 609 "rte C. AI-2Z 'Hu 4-1/2" XN NIPPLE 1 8516' I- 9 -5/8" x 7" BKR ZXP LT PKR, ID = 6.23" w /TIEBACK SEAL ASSY & FLEXLOCK LNR HGI I• I TOP OF 9 -5/8" WHIPSTOCK H 8728' MILLOUT WINDOW (4 -04A) 8728' - 8745' I9 -5/8" EZSV H 8752' 19-5/8" CSG, 47 #, NT8OHS XO TO NT95HS H 10957' I X 8 PAW i 1111 1 , ' 1 11990' 14 4 -1/2" HES X NIP (9CR), ID = 3.813" 1 . 11111∎ 111111 ■1 4 111111 1"�11/11111111 u' 12020' 147" x 4 -1/2" BKR S -3 PKR, ID = 3.875" 9 -5/8" CSG, 47 #, NT95HS NSCC, ID = 8.861" H 13243' IA ■11 1111 / ■ 1�. /11 N 1 12054' 1_14-1/2" HES X NIP (9CR), ID = 3.813" 1 ��1�1�11 1 ,..._v_v_....„. I 12085' I_14 -1/2" HES XN NIP (9CR), ID = 3.725" 1 4 -1/2 ", 12.6 #, 13CR -80, VAM TOP, .0152 bpf, ID = 3.958" H 1210T ' ' PERFORATION SUMMARY 1 12107' 144-1/2"WLEG, ID = 4.00" I REF LOG: ANGLE AT TOP PERF: 11° @ 12200' 1 Note: Refer to Production DB for historical perf data SIZE SPF INTERVAL Opn /Sqz DATE ' 3 -3/8" 6 12200 - 12224 0 04/29/09 3 -3/8" 6 12255 - 12277 0 04/28/09 ' 3 -3/8" 6 12289 - 12311 0 04/28/09 1 3 -3/8" 6 12332 -12352 0 04/27/09 3 -3/8" 6 12416 -12429 0 04/28/09 , 3 -3/8" 6 12452 -12465 0 04/28/09 3 -3/8" 6 12465 - 12485 0 04/27/09 ' I PBTD I 12512' 1'1'1'1'1'1'1'1 1 / 17" LNR, 26 #, HYRIL, .0383 bpf, ID = 6.276" I--I 12598' DATE REV BY COMMENTS DATE REV BY COMMENTS ENDICOTT UNIT 09/20/89 D15 COMPLETION WELL: 4- 04A /T -30 04/05/09 D14 SIDETRACK (END4 -04A) PERMIT No: 2090190 05/19/09 JLJ/TLH GLVS C/0 (05/09/09) API No: 50- 029 - 21968 -01 05/19/09 RRD/TLH PERFS (04/27- 28/09) SEC 8, T11 N, R17E, 2577' FSL & 845' FEL 1 BP Exploration (Alaska) • . BP EXPLORATION Page 1 of 15 Operations Summary Report p Y p Legal Well Name: 4- 04A/T -30 Common Well Name: 4- 04A/T -30 Spud Date: Event Name: REENTER +COMPLETE Start: 3/18/2009 End: 4/5/2009 Contractor Name: DOYON DRILLING INC. Rig Release: 4/5/2009 Rig Name: DOYON 14 Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 3/18/2009 00:00 - 01:00 1.00 MOB P PRE Move rig off well 2 -30B 01:00 - 06:30 5.50 MOB P PRE Move rig f/ Endicott MPI to Endicott SDI. 06:30 - 08:00 1.50 MOB P PRE - Position rig over well 4 -04. -Shim rig. 08:00 - 09:00 1.00 RIGU P PRE -Skid rig floor to drilling position. -Lay mats for rock washer. 09:00 - 10:30 1.50 RIGU P PRE -RU rig floor. -Lay herculite, spot rock washer and berm. -Slide conveyor back in place. 10:30 - 11:30 1.00 RIGU P PRE Start C/O saver sub to 4 -1/2" IF f/ 5" DP. - Accept rig @ 11:00 11:30 - 14:00 2.50 WHSUR P DECOMP -Stop changing saver sub to pull BPV w/ DSM. - Mobilize DSM lubricator to rig floor. -MU pulling tool in lubricator. Install lubricator on tree. Test to 500 psi x 5 min on chart. -Pull BPV. RD lubricator. 14:00 - 15:30 1.50 RIGU P DECOMP -Cont. C/O saver sub to 4 -1/2" IF f/ 5" DP. Install torque ring. -C /O pipe grabber dies and bell guide. -RU lines to tree and IA. Install secondary valve in IA. SIMOPS: hard line crew spot and berm tiger tank and RU hard line. 15:30 - 16:30 1.00 RIGU P DECOMP -Check hard line w/ 100 psi air. OK. -Steam hard line and test w/ water to 1500 psi. OK. 16:30 - 18:30 2.00 WHSUR P DECOMP Displace freeze protect out of well: -Pump 20 bbls 9.8 ppg brine down IA, taking returns out tubing to tiger tank. 168 gpm @ 310 psi. -Blow down lines and swap. -Pump 40 bbls 9.8 ppg brine down tubing, taking returns out IA to tiger tank. 168 gpm @ 340 psi. -Allow remaining diesel to migrate x 30 min. Pump 20 bbls 9.8 ppg brine down tubing, taking returns out IA to tiger tank. -Blow down lines and connect to take returns to pits. 18:30 - 20:30 2.00 WHSUR P DECOMP - Circulate well w/ 460 bbls 9.8 ppg brine until returns clean. 252 gpm @ 1050 psi. - Confirm well static. -Blow down lines. 20:30 - 22:30 2.00 WHSUR P DECOMP -FMC Rep. dry rod TWC. - Attempt to test TWC f/ below to 500 psi. Observe pressure bleed down to 0. Repeat w/ same result. Verify no surface leaks. - Attempt to establish leak rate: pressure up below TWC to 500 psi. Shut down pump and observe bleed off. Repeat process. Determine that it takes 1.5 - 2 bbls to pressure up to 500 psi, while pressure bleeds off to formation in +/- 1.5 min after shutting down pump. Confirm during process that there is no leak by TWC. -Test TWC f/ above to 3500 psi x 10 min on chart. 22:30 - 00:00 1.50 WHSUR P DECOMP -ND tree and adapter flange. Split tree f/ adapter flange and remove f/ cellar. - Mobilize spacer spool to cellar and install same on tubing spool. Printed: 5/11/2009 10:35:07 AM BP EXPLORATION Page 2 of 15 Operations Summary Report Legal Well Name: 4- 04A/T -30 Common Well Name: 4- 04A/T -30 Spud Date: Event Name: REENTER +COMPLETE Start: 3/18/2009 End: 4/5/2009 Contractor Name: DOYON DRILLING INC. Rig Release: 4/5/2009 Rig Name: DOYON 14 Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 3/19/2009 00:00 - 03:30 3.50 BOPSUF P DECOMP -NU BOP - Install choke line, riser and flow line. 13 -5/8" 5M BOP stack configuration: - Annular preventer - 3 -1/2" x 6" VBR (top rams) - Blind Rams - Mud cross - 2 -7/8" x 5" VBR (bottom rams) 03:30 - 04:30 1.00 BOPSUF P DECOMP RU to test BOP 04:30 - 11:30 7.00 BOPSUF P DECOMP Test BOP and related equipment per BP / AOGCC procedures and regulations. Test components to 250 psi low - 3500 psi high x 5 min each on chart. Test top rams and bottom rams w/ 5" and 4 -1/2" test jts. Test witnessed by WSL and Toolpusher. Bob Noble, AOGCC Rep, waived witness of test. -Tests failed (2): -Choke manifold valve #5 failed. Continue testing rest of components before 0/0 valve #5. - Annular preventer test w/ 4 -1/2" test jt failed. Cont. testing top and bottom rams w/ 4 -1/2" test jt before C/0 rubber element in annular preventer when 0/0 valve #5 in choke manifold. - Perform accumulator test: 1. System pressure: 3050 psi. 2. Pressure after close: 1700 psi 3. 200 psi attained @ 32 sec. 4. Full pressure attained @ 2 min 45 sec. 5. Nitrogen: 4 bottles x 2200 psi avg. 11:30 - 19:30 8.00 BOPSUF N RREP DECOMP -ND flow line and riser. Remove cap f/ top of annular preventer. -0 /0 rubber element in annular preventer. Install cap and NU riser and flow line. - Remove super choke. -C/0 valve #5 in choke manifold. When doing this observe that valve #9 was not in best of conditions, although it tested. Decided to 0/0 valve #9 as well. - Install super choke. 19:30 - 00:00 4.50 BOPSUF P DECOMP Cont. testing BOP and related equipment: -Test annular preventer w/ 4 -1/2" test jt to 250 psi low - 2500 psi high x 5 min each on chart. -Test valve #5 and valve #9 in choke manifold to 250 psi low - 3500 psi high x 5 min each on chart. -Tests witnessed by WSL and Tourpusher. Bob Noble, AOGCC Rep, waived witness of test. 3/20/2009 00:00 - 01:00 1.00 BOPSUF P DECOMP -Test blind rams, valve #3 in choke manifold and 4" kill valve in pits to 250 psi low - 3500 psi high x 5 min each on chart. -Tests witnessed by WSL and Tourpusher. Bob Noble, AOGCC Rep, waived witness of test. - Summary of BOP test: tested 29 components 1. 13 -5/8" annular w/ 4 -1/2" test jt. 2. 3 -1/2" x 6" VBR (upper rams) w/ 4 -1/2" and 5" test jts. Printed: 5/11/2009 10:35:07 AM • BP EXPLORATION Page 3 of 15 Operations Summary Report Legal Well Name: 4- 04A/T -30 Common Well Name: 4- 04A/T -30 Spud Date: Event Name: REENTER +COMPLETE Start: 3/18/2009 End: 4/5/2009 Contractor Name: DOYON DRILLING INC. Rig Release: 4/5/2009 Rig Name: DOYON 14 Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 3/20/2009 00:00 - 01:00 1.00 BOPSUF P DECOMP 3. Blind rams 4. 2 -7/8" x 5" VBR (lower rams) w/ 4 -1/2" and 5" test jts. 5. HCR valves (kill and choke) 6. Manual valves on kill line and choke line 7. Choke manifold valves (14) 8. Manual choke and hydraulic choke 9. 5" Inside BOP, 5" FOSV (ball type), Upper and Lower kelly valves (upper and lower top drive IBOP). 01:00 - 02:30 1.50 WHSUR P DECOMP - Mobilize lubricator extensions to rig floor and install same in stack. Close top rams. - Mobilize lubricator to rig floor and install on extensions. Test assy. to 500 psi x 5 min on chart. -Pull TWC. 02:30 - 04:00 1.50 WHSUR P DECOMP -LD lubricator and lubricator extensions. -LD tools not needed for upcoming operations. -Blow down choke and kill line. - Install bales and 5" elevators. 04:00 - 04:30 0.50 PULL P DECOMP -MU XO to 1 jt 5" DP. -RIH and screw into tubing hanger. BOLDS. -Pull tubing hanger to rig floor. Tubing pulled free w/ 145k. PUW 140k after free (blocks weight: 50k). 04:30 - 07:00 2.50 PULL P DECOMP -Pump 35 bbls Safe Surf 0 pill followed by 35 bbls hi -vis sweep. - Circulate w/ 9.8 ppg brine S /S. 295 gpm @ 240 psi -LD jt 5" DP, XO and tubing hanger 07:00 - 08:00 1.00 PULL P DECOMP RU to Dull and LD 4 -1/2" tubing: - Install power tongs. C/O elevators. - Install control line spooling unit. 08:00 - 10:00 2.00 PULL P DECOMP Pull & LD 4 -1/2" 12.6# L -80 TDS tubing to SSSV. - Recover dual control lines, 19 clamps and 4 SS bands. 10:00 - 10:30 0.50 PULL P DECOMP RD control line spooling unit. 10:30 - 17:30 7.00 PULL P DECOMP Cont. pulling and LD 4 -1/2" 12.6# L -80 TDS tubing and completion equipment. -Total jts LD: 225 + 3.5' cutoff -Also LD: SSSV assy and GLM assy. 17:30 - 18:30 1.00 PULL P DECOMP -RD tubing handling equipment. -Clean and clear rig floor of equipment not needed for upcoming operations. 18:30 - 19:00 0.50 WHSUR P DECOMP Install wear bushing. 19:00 - 20:00 1.00 CLEAN P DECOMP Mobilize BHA components to rig floor. Strap and calibrate same. 20:00 - 22:00 2.00 CLEAN P DECOMP , MU cleanout BHA: 8" window mill + 8 -3/8" lower watermelon mill + flex jt + 8 -1/2" upper watermelon mill + XO + 9 jts 6 -3/4" DCs + XO + 6 jts 5" HWDP. 22:00 - 23:30 1.50 CLEAN P DECOMP -Cut and slip drilling line (59.5'). - Service top drive. 23:30 - 00:00 0.50 CLEAN P DECOMP RIH w/ cleanout BHA on 5" DP 1x1 to 1136'. 3/21/2009 00:00 - 07:00 7.00 CLEAN P DECOMP Cont. RIH w/ cleanout BHA on 5" DP 1x1 f/1136' to 8850' 07:00 - 08:30 1.50 CLEAN P DECOMP Pump hi -vis sweep and circulate S /S. 381 gpm @ 650 psi. 08:30 - 12:00 3.50 CLEAN P DECOMP POOH and rack back 5" DP f/ 8850' to HWDP. 12:00 - 15:00 3.00 CLEAN P DECOMP PU additional 5" DP 1x1 and RIH to 3871'. 15:00 - 15:30 0.50 CLEAN P DECOMP Circulate string volume, 294 gpm @ 250 psi. 15:30 - 16:30 1.00 CLEAN P DECOMP POOH and rack back additional 5" DP. Printed: 5/11/2009 10:35:07 AM • BP EXPLORATION Page 4 of 15 Operations Summary Report Legal Well Name: 4- 04A/T -30 Common Well Name: 4- 04A/T -30 Spud Date: Event Name: REENTER +COMPLETE Start: 3/18/2009 End: 4/5/2009 Contractor Name: DOYON DRILLING INC. Rig Release: 4/5/2009 Rig Name: DOYON 14 Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 3/21/2009 15:30 - 16:30 1.00 CLEAN P DECOMP -Total 5" DP PU: 378 jts (126 stands) 16:30 - 17:00 0.50 CLEAN P DECOMP -Rack back 2 stands 5" HWDP and 3 stands 6 -3/4" DCs. -LD mill assembly in one piece to pipe shed. 17:00 - 17:30 0.50 CLEAN P DECOMP Clean rig floor. 17:30 - 19:00 1.50 EVAL P DECOMP -Spot Schlumberger units. -RU a -line equipment and USIT tool. 19:00 - 00:00 5.00 EVAL P DECOMP -RIH w/ USIT /GR/CCL on a -line to 8850'. -Take USIT log on corrosion mode f/ 8850' to surface. 3/22/2009 00:00 - 01:00 1.00 EVAL P DECOMP -RIH back to 700' and take high definition pass f/ 700' to 300'. -POOH w/ USIT log. LD tools. - Observe 40% corrosion (confirmed w/ high definition pass) and gaule mark in 9 -5/8" casing in int. 350' -690'. Observe gaule mark in 9 -5/8" casing in int. 2550' -4700' w/ 30% corrosion in int. 3200' -3450' and 4650'- 4700'. Observe cement f/ 8850' to 2400'. 01:00 - 03:30 2.50 EVAL P DECOMP - Discuss results of USIT log w/ ODE. Decided to verify communication between 9 -5/8" casing and 13 -3/8" casing. -Line up OA (9 -5/8" x 13 -3/8" annulus) to tiger tank. - Pressure up in 9 -5/8" casing to 500 psi, observing pressure in OA to 20 psi. Open OA to tiger tank and observe flow while pressure in 9 -5/8" casing bleeds to 0 psi. Repeat test 3 times w/ same result. 03:30 - 04:30 1.00 EVAL P DECOMP Discuss results of test w/ ODE and Field Superintendent. Decided to proceed w/ plan and set EZSV on a -line. 04:30 - 06:30 2.00 DHB P DECOMP. Prepare and RU tools to set 9 -5/8" EZSV on e-line. 06:30 - 10:00 3.50 DHB P DECOMP -RIH w/ 9 -5/8" EZSV and GR/CCL on a -line. - Identify collar @ 8745' WL measument. - Position and set EZSV @ 8739' WL measurement (top of EZSV). (Age - -POOH e-line w/ GR /CCL. 10:00 - 10:30 0.50 DHB P DECOMP LD GR/CCL tools. RD a -line equipment. 10:30 - 13:30 3.00 STWHIP P WEXIT -PU whipstock. PU window mill assy. and attach w/ shear bolt. MU BHA. - Shallow test MWD @ 570'. 450 gpm @ 490 psi. 13:30 - 18:00 4.50 STWHIP P WEXIT RIH w/ whipstock and window mill BHA on 5" DP stands f/ 570' to 8599'. -Trip @ controlled rate per Baker Rep. -Fill pipe every 25 stands. 18:00 - 19:00 1.00 STWHIP P WEXIT - Obtain parameters: PUW 215k / SOW 170k. Break circulation 448 gpm @ 990 psi. - Orient whipstock 83 deg left f/ high side. 19:00 - 20:00 1.00 STWHIP P WEXIT -RU testing equipment. - Pressure up 9 -5/8" casing in stages while monitoring pressure behaviour in 9 -5/8" x 13 -3/8" annulus (OA): 1. Pressure up to 200 psi and hold x 5min. Observe no pressure in OA. 2. Cont. pressure up to 300 psi and hold x 5min. Observe no pressure in OA. 3. Cont. pressure up to 400 psi and hold x 5 min. Observe no pressure in OA. 4. Cont. pressure up to 500 psi and hold x 5min. Observe no pressure in OA. 5. Cont. pressure up to 600 psi. Observe bleed off after Printed: 5/11/2009 10:35:07 AM • BP EXPLORATION Page 5 of 15 Operations Summary Report Legal Well Name: 4- 04A/T -30 Common Well Name: 4- 04A/T -30 Spud Date: Event Name: REENTER +COMPLETE Start: 3/18/2009 End: 4/5/2009 Contractor Name: DOYON DRILLING INC. Rig Release: 4/5/2009 Rig Name: DOYON 14 Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 3/22/2009 19:00 - 20:00 1.00 STWHIP P WEXIT stopping pump. Pressure bleed to 250 psi in 10 min. Observe no pressure in OA. Open OA to tiger tank. No flow. -Bleed off remaining pressure. RD testing equipment. Blow down line to tiger tank. 20:00 - 23:00 3.00 STWHIP P WEXIT -RIH slowly while keeping whipstock orientation @ 83 -84 deg left f/ high side. -Tag EZSV @ 8746' DP measurement. Attempt to set weight on EZSV. Observe EZSV moves. Cont. pushing EZSV slowly to 8752' (6'). Slack off 10k on EZSV and hold. Attempt to PU stopping @ 10k over PUW. -Slack off on EZSV @ 8752' and set whipstock w/ 20k. Shear mill assy bolt w/ 45k. Whipstock orientation: 84 deg left f/ high side. -Top of whipstock / window (TOW) @ 8728' 23:00 - 00:00 1.00 STWHIP P WEXIT -Suck brine out of pits 1 and 2 for displacement. -Pump hi -vis sweep. - Displace well w/ 9.1 ppg LSND mud. 433 gpm @ 1070 psi. /¢ 4 3/23/2009 00:00 - 01:00 1.00 STWHIP P WEXIT -Cont. displacing well w/ 9.1 ppg mud - Take SPRc 01:00 - 08:00 7.00 STWHIP P WEXIT Mill window f/ 8728' to 8745' and new hole to 8747'. -440 gpm @ 1050 psi. 60 -100 RPM @ 5-11k torque. 2 -5k V � WOB. 08:00 - 10:00 2.00 STWHIP N RREP WEXIT Repair top drive. 10:00 - 11:00 1.00 STWHIP P WEXIT Cont. drilling new hole (rat hole) w/ window mill assy. to 8770'. 11:00 - 11:30 0.50 STWHIP P WEXIT -Ream and backream through window 6 times @ drilling rate. -Turn off pumps and slide through window. OK. 11:30 - 12:30 1.00 STWHIP P WEXIT -Pump hi -vis sweep and circulate S /S. 434 gpm @ 1100 psi. Rotate and reciprocate @ 100 RPM. -Rack back 1 stand 5" DP. 12:30 - 13:30 1.00 STWHIP P WEXIT -RU testing equipment. - Perform FIT: pressure up to 860 psi and hold x 15 min. Pressure drop to 650 psi in 12 min and stabilized. MW: 9.1 PPG. TVD: 6879'. FIT 11.5 ppg EMW. -RD testing equipment. 13:30 - 17:00 3.50 STWHIP P WEXIT -Flow check well x 10 min. -Pump dry job. -POOH f/ 8670' to BHA. • 17:00 - 20:00 3.00 STWHIP P WEXIT -Rack back 2 stands 5" HWDP. -LD 9 jts 6 -3/4" DCs. and window mill assy. -Clear rig floor. -Upper watermelon mill in gauge. 20:00 - 20:30 0.50 STWHIP P WEXIT Pull wear bushing. 20:30 - 21:00 0.50 STWHIP P WEXIT -MU stack washer on 1 jt 5" DP. -Flush stack and flow line. Function rams and annular preventer. -LD stack washer. 21:00 - 21:30 0.50 STWHIP P WEXIT Install wear bushing. 21:30 - 00:00 2.50 STWHIP P WEXIT MU drilling BHA per DD and MWD w/ 8 -1/2" PDC bit + 6 -3/4" PDM w/ 1.15 deg bend + LWD + MWD + NM Flex Collars + HWDP + Dart Sub + Jars + HWDP. -Load nuclear sources. 3/24/2009 00:00 - 01:00 1.00 STWHIP P WEXIT -Cont. PU 5" HWDP 1x1. Printed: 5/11/2009 10:35:07 AM • BP EXPLORATION Page 6 of 15 Operations Summary Report Legal Well Name: 4- 04A/T -30 Common Well Name: 4- 04A/T -30 Spud Date: Event Name: REENTER +COMPLETE Start: 3/18/2009 End: 4/5/2009 Contractor Name: DOYON DRILLING INC. Rig Release: 4/5/2009 Rig Name: DOYON 14 Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 3/24/2009 00:00 - 01:00 1.00 STWHIP P WEXIT -RIH on 5 stands 5" DP. MU ghost reamer (8 -1/2" OD blades). Ghost reamer positioned @ 1203' f/ bit. - Shallow test MWD w/ 590 GPM @ 1380 psi. 01:00 - 06:30 5.50 STWHIP P WEXIT Cont RIH f/ 1203' to 8728' (TOW). - -Wash down f/ 8628' to 8728' to take tie -in (MAD pass) w/ LW D. SPR @ 8728' (MW 9.1 ppg): Pump #1 30 spm @ 460 psi / 40 spm @ 550 psi Pump #2 30 spm @ 460 psi / 40 spm @ 530 psi 06:30 - 08:00 1.50 STWHIP P WEXIT -Slip and cut drilling line (59.5') - Inspect and service top drive. 08:00 - 12:00 4.00 DRILL P PROD1 - Orient BHA and run through window to 8770'. OK. -Dir. drill f/ 8770' to 8892'. Sliding only in this int. -PUW 200k / SOW 170k / ROTW 185k. 568 gpm @ 2100 psi off / 2200 psi on. 12:00 - 00:00 12.00 DRILL P PROD1 -Dir drill f/ 8892' to 9610' (sliding and rotation). -PUW 215k / SOW 176k / ROTW 196k. 570 gpm @ 2150 psi off / 2510 psi on. 80 RPM @ 5k torque off / 9k torque on. 10 -15k WOB. SPR @ 9515' (MW 9.3 ppg) Pump #1 30 spm @ 530 psi / 40 spm @ 580 psi Pump #2 30 spm @ 510 psi / 40 spm @ 530 psi Total sliding time f/ today: 6.70 hrs. Total rotating time f/ today: 2.33 hrs. Effective drilling time today: 9.03 hrs. 3/25/2009 00:00 - 12:00 12.00 DRILL P PROD1 Continue to Directionally drill f/ 9,610' to 10,310' md. -PUW 237k, SOW 190k, ROTW 212k. -80 RPM @ 9 -12k torque on / 7k torque off. -560 gpm / 2600 psi on / 2180 psi off. 10 -18k WOB. AST 4.85 hrs ART 2.33 hrs ADT 7.18 hrs. 12:00 - 00:00 12.00 DRILL P PROD1 Continue to Directionally drill f/ 10,310' to 10,849' md. -PUW 250k, SOW 203k, ROTW 224k. -80 RPM @ 11 -12k torque on / 8k torque off. -565 gpm / 2650 psi on / 2260 psi off. 10 -18k WOB. AST 4.98 hrs ART 1.68 hrs ADT 6.66 hrs. Daily drilling hours: AST 9.83 hrs ART 4.01 hrs ADT 13.84 hrs 3/26/2009 00:00 - 11:00 11.00 DRILL P PROD1 Directionally drill ahead from 10.849' to 11 and -PUW 255k, SOW 203k, ROTW 224k. -80 RPM @ 9 -12k torque on / 8k torque off. -560 gpm / 2650 psi on / 2260 psi off. 10 -18k WOB. -HV Sweep pumped @ 11,200' md. -10% increase in cuttings w/ sweep returns. - Cuttings are Pea sized. 11:00 - 12:00 1.00 DRILL P PROD1 Displace well to: -New Glycol enhanced ( +/- 5 %) 10.2 ppg LSND mud. -While displacing, drill from 11,325' to 11,349' md. -HV Sweep spacer produced a 50% increase in cuttings. Printed: 5/11/2009 10:35:07 AM • BP EXPLORATION Page 7 of 15 Operations Summary Report Legal Well Name: 4- 04A/T -30 Common Well Name: 4- 04A/T -30 Spud Date: Event Name: REENTER +COMPLETE Start: 3/18/2009 End: 4/5/2009 Contractor Name: DOYON DRILLING INC. Rig Release: 4/5/2009 Rig Name: DOYON 14 Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 3/26/2009 11:00 - 12:00 1.00 DRILL P PROD1 - Cuttings were mostly Pea sized clay balls & some wall cake. -PUW 275k, SOW 210k, ROT wt 240k. -WOB 15 -20k. RPM 80 / Tq on 12 -15k / Tq off 10k. -560 gpm / 2630 psi on / 2270 psi off. @ 11,349' and / 9,149' tvd. - ECD Actual 11.04 ppg. Calc 10.98 ppg. AST 1.48 hrs ART 4.83 hrs ADT 6.31 hrs 12:00 - 00:00 12.00 DRILL P PROD1 Continue to Directionally drill f/ 11,349' to 11,819' md. -PUW 285k, SOW 210k, ROTW 243k. -60 RPM @ 12k torque on / 9k torque off. -500 gpm / 2410 psi on / 2270 psi off. 15 -18k WOB. -@ 11,819' and / 9,613' tvd. -ECD Actual 11.06 ppg. Calc 11.10 ppg. AST 1.32 hrs ART 6.93 hrs ADT 8.25 hrs. Daily drilling hours: AST 2.80 hrs ART 11.76 hrs ADT 14.56 hrs 3/27/2009 00:00 - 12:00 12.00 DRILL P PROD1 Directionally drill f/ 11,819' to 12,100' md. -PUW 293k, SOW 212k, ROTW 250k. -70 RPM @ 11 -13k torque on / 12k torque off. -500 gpm / 2690 psi on / 2430 psi off. 25k WOB. -@ 12,020' and pumped a HV Sweep. -A 10% increase in cuttings was noted. - Cuttings were Pea shaped but 1/2 the size of a Pea. @ 12,100' and / 9,890' tvd. - ECD Actual 11.16 ppg. Calc 10.83 ppg. AST 1.65 hrs ART 8.05 hrs ADT 9.70 hrs 12:00 - 00:00 12.00 DRILL P PROD1 Continue to Directionally drill f/ 12,100' to 12,510' md. -PUW 305k, SOW 215k, ROTW 250k. -100 RPM @ 15k torque on / 13k torque off. -550 gpm / 2700 psi on / 2500 psi off. 15k WOB. -@ 12,510' and / 10,291' tvd. -ECD Actual 11.10 ppg. Calc 10.83 ppg. AST 0 hrs ART 10.1 hrs ADT 10.1 hrs. Daily drilling hours: AST 1.65 hrs ART 18.15 hrs ADT 19.8 hrs 3/28/2009 00:00 - 02:30 2.50 DRILL P PROD1 Directionally drill f/ 12,510' to TD @ 12,585' and / 10,365' tvd. -PUW 305k, SOW 215k, ROTW 250k. -100 RPM @ 15k torque on / 13k torque off. -550 gpm / 2700 psi on / 2500 psi off. 10 -15k WOB. -@ 12,510' and / 10,291' tvd. -ECD Actual 11.10 ppg. Calc 10.83 ppg. AST 0 hrs ART 2.03 hrs ADT 2.03 hrs. Daily drilling hours: AST 0 hrs ART 2.03 hrs ADT 2.03 hrs Printed: 5/11/2009 10:35:07 AM • 1110 BP EXPLORATION Page 8 of 15 Operations Summary Report Legal Well Name: 4- 04A/T -30 Common Well Name: 4- 04A/T -30 Spud Date: Event Name: REENTER +COMPLETE Start: 3/18/2009 End: 4/5/2009 Contractor Name: DOYON DRILLING INC. Rig Release: 4/5/2009 Rig Name: DOYON 14 Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 3/28/2009 02:30 - 03:00 0.50 DRILL P PROD1 Obtain: -Last survey & SPR's. - Circulate for 15 minutes. 03:00 - 06:00 3.00 DRILL P PROD1 Mad pass from 12,585' to 12,140' md. - Perform Mad pass @ 200 ft/hr maximum. -100 RPM / 15k torque. -500 GPM / 2,100 psi. 06:00 - 06:30 0.50 DRILL P PROD1 Wash and ream to bottom @ 12,585' md. -100 RPM / 14k torque. -500 GPM / 2,100 psi. 06 :30 - 09:30 3.00 DRILL P PROD1 Pump sweep (74 YP). Circulate 3x bottoms up. -Sweep returns showed 15% increase in shale & sand. -550 GPM, 130 SPM @ 2,450 psi. -120 RPM / 14 -19k torque. -Stand back 1 stand after sweep is to surface. - Continue to circulate. 09:30 - 12:00 2.50 DRILL P PROD1 Check Flow 10 min. -POH w/ 5" DP to above window @ 8,573' md. 12:00 - 14:00 2.00 DRILL P PROD1 Check Flow @ window. -RIH from 8,573' to 12,538' md. -Wash down last stand to 12,585' md. 14:00 - 14:30 0.50 DRILL P PROD1 Drill f/ 12,585' to TD @ 12,600' and / 10,379' tvd. -PUW 305k, SOW 214k, ROTW 252k. -120 RPM CO 18k torque on / 15k torque off. -550 gpm / 2,720 psi on / 2,580 psi off. 10 -15k WOB. AST 0 hrs ART 0.5 hrs ADT 0.5 hrs. Daily totals. AST 0 hrs ART 0.5 hrs ADT 2.53 hrs 14:30 - 17:30 3.00 DRILL P PROD1 Pump HV Sweep. Circulate 3x bottoms up. -Sweep returns showed 50% increase in shale & sand. - Rotate and reciprocate 120 RPM. -550 GPM @ 2,500 psi. -Spot liner running pill. -Check flow 10 min. 17:30 - 20:30 3.00 DRILL P PROD1 POOH from 12,600' - 8,573' md. -Check flow for 10 min. -Pump dry job. 20:30 - 00:00 3.50 DRILL P PROD1 Continue POOH from 8,573' - 725' md. 3/29/2009 00:00 - 01:30 1.50 DRILL P PROD1 Monitor well @ HWDP. -LD HWDP, Jars & XO. 01:30 - 03:00 1.50 DRILL P PROD1 PJSM on NUKES. -LD: D.C's, Stab & MWD. Remove Nukes. -LD: LWD, Motor & Bit. 03:00 - 03:30 0.50 DRILL P PROD1 Clear floor of all Tools not required for upcoming operations. 03:30 - 04:00 0.50 DRILL P PROD1 Drain Stack. Pull Wear ring. - Function: Bag, HCR Choke, HCR Kill, Btm Rams & Blind Rams. 04:00 - 05:30 1.50 DRILL P PROD1 PJSM on C/O top Rams. Change out top Rams from 3 1/2" X 6" to 4 1/2" X 7 ". 05:30 - 06:00 0.50 DRILL P PROD1 RU to test Upper Rams. 06:00 - 08:00 2.00 DRILL P PROD1 Test upper Rams (4 1/2" X 7" ). -Test w/ 5" & 7" test Jts. Printed: 5/11/2009 10:35:07 AM BP EXPLORATION Page 9 of 15 Operations Summary Report Legal Well Name: 4- 04A/T -30 Common Well Name: 4- 04A/T -30 Spud Date: Event Name: REENTER +COMPLETE Start: 3/18/2009 End: 4/5/2009 Contractor Name: DOYON DRILLING INC. Rig Release: 4/5/2009 Rig Name: DOYON 14 Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 3/29/2009 06:00 - 08:00 2.00 DRILL P PROD1 -Test to 250 psi low & 3500 psi high pressure. -Pass. 08:00 - 08:30 0.50 DRILL P PROD1 RD test equipment. Install Wear ring. 08:30 - 09:30 1.00 CASE P PROD1 RU Csq equipment to run 7" production Liner. 09:30 - 12:00 2.50 CASE P PROD1 PJSM on running 7" liner. -Run 7 ", 26 #, 13 Cr80, Hydril 521 Liner per running order. -Run Liner to 851' md. - Utilize "Jet Lube Seal Guard" thread compound. - Optimum Tq 10,000 ft / lbs. 12:00 - 18:30 6.50 CASE P PROD1 Continue to run 7" Liner. Run 7 ", 26 #, L -80, Hydril 521 Liner per running order. -Run Liner from 851' to 4,100' md. -PU & MU Liner hanger Packer. -Mix & pour Sealant Gel & let set 30 minutes. 18:30 - 19:00 0.50 CASE P PROD1 Circulate Liner volume. -Stage up to 210 gpm / 340 psi. 19:00 - 22:30 3.50 CASE P PROD1 RIH w/ 7" Liner on 5" DP from 4,100' to 8,700' md. -Above TOW. - Window top 8,728' md. Bottom of window 8,745' md. -Fill pipe every 10 Stds. 22:30 - 00:00 1.50 CASE P PROD1 CBU X 1.5 @ 8,700' md. -210 gpm / 480 psi. 3/30/2009 00:00 - 00:30 0.50 CASE P PROD1 Continue to CBU X 1.5 @ 8,700' md. 210 gpm / 480 psi. - Obtain parameters: -PUW 210k, SOW 170k, ROT wt 188k @ 10 RPM. -Pump # 1 -15 spm = 280 psi. 30 spm = 370 psi. 40 spm = 420 psi. -Pump # 2 -15 spm = 280 psi. 30 spm = 360 psi. 40 spm = 420 psi. -10 RPM = 9k Tq w/ 10kTq breakover. -20 RPM = 8k Tq w/ 9k Tq breakover. 00:30 - 03:30 3.00 CASE P PROD1 Continue to RIH w/ 7" Liner on 5" DP. -RIH from 8,700' to 12,485' md. -Fill pipe & break circulation every 10 Stds. - Circulate every 20 Stds. -PUW & SOW every 10 Stds: -Std # 1= 140k / 136k. -Std # 10= 155k / 144k. -Std # 20= 173k / 150k. -Std # 30= 190k / 160k. -Std # 40= 202k / 160k. -Std # 50= 216k / 162k. -Std # 60= 240k / 170k. -Std # 70= 265k / 170k. -Std # 80= 295k / 180k. -Std # 90= 325k / 200k. 03:30 - 04:30 1.00 CASE P PROD1 Circulate last Std (Std #90) down from 12,485' to 12,589' md. -44 gpm / 540 psi. PUW 325k, SOW 200k. -PU 1 Jt of 5" DP and tagged bottom 11ft in @ 12,600' md. - Continue to circulate 94 gpm / 520 psi. -PUW 325k, SOW 200k. 04:30 - 05:00 0.50 CASE P PROD1 LD 1 Jt of 5" DP. -PU Rotating Cmt head. Remove bottom 15' pup. -MU 5' pup on bottom. - Attach cement hose to Lo -Torq valve 90. -MU Top Drive. Liner stuck at 12598'. Unable to work free. 05:00 - 07:00 2.00 CEMT P PROD1 Circulate and condition mud. -Wait on trucks due to North Star fluid losses. Printed: 5/11/2009 10:35:07 AM BP EXPLORATION Page 10 of 15 Operations Summary Report Legal Well Name: 4- 04A/T -30 Common Well Name: 4- 04A/T -30 Spud Date: Event Name: REENTER +COMPLETE Start: 3/18/2009 End: 4/5/2009 Contractor Name: DOYON DRILLING INC. Rig Release: 4/5/2009 Rig Name: DOYON 14 Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 3/30/2009 07:00 - 10:00 3.00 CEMT P PROD1 PJSM on cement job. -Pump 5 bbls H20, test lines to 4500 psi. -Pump: -30 bbls Mud Push @ 11 ppg. -105 bbls of Lead Cmt @ 11.5 ppg. -35 bbls of Tail Cmt @ 15.8 ppg _ -5 bbls of H2O to drop plug. -RD Cmt line. - Applied 15k Torque & SO to 175k. PU to 225k. - Released Torque. Latched liner wiper plug @ 1316 Stks. -Bump Landing Collar @ 2,841 Stks. -CIP @ 10:00 hrs. 10:00 - 10:30 0.50 CEMT P PROD1 Pressure up to 2500 psi to set Liner Hanger Packer. -Set 60k down to confirm Hanger was set. -Bleed off pressure. Check floats. - Pressured up to 4000 psi to release from Liner Hanger. -Set Liner Top Packer w/ 70k and confirm w/ rotation. -PU to circulate. 10:30 - 12:00 1.50 CEMT P PROD1 Pump Hi Vis Sweep w/ Nut Plug. -510 gpm / 1100 psi. - Received 22 bbls of cement returns to surface. 12:00 - 12:30 0.50 CEMT P PROD1 Drop Wiper ball. Pump 1 DP volume. -480 gpm / 750 psi. 12:30 - 13:00 0.50 CEMT P PROD1 Break off & LD Cement Head & 3 Jts of 5" DP. 13:00 - 14:30 1.50 CEMT P PROD1 Cut & Slip 59.5' of 1 1/4" Drilling line. - Service Top Drive. 14:30 - 17:00 2.50 CEMT P PROD1 POH. LD 5" DP from 8,400' to 5,100' and to surface. 17:00 - 19:00 2.00 CEMT P PROD1 POH. Rack back 5" DP from 5,100' md. 19:00 - 19:30 0.50 CEMT P PROD1 Make service breaks & LD Liner Packer running Tool. 19:30 - 20:00 0.50 CEMT P PROD1 Clear Rig floor of Vendor Tools. -MOB Polishing Mill to Rig floor. 20:00 - 22:30 2.50 CEMT P PROD1 MU Polishing Mill & RIH w/ 5" DP to 8,425' md. -Wash down last Std. 22:30 - 23:30 1.00 CEMT P PROD1 PU single & Tag Liner Top @ 8,519' md. -PUW 205k, SOW 160k, ROT wt 176k. -84 gpm / 210 psi. 6k Tq @ 20 RPM. -Dress Liner Top per Baker rep. LD single to 8,488' md. 23:30 - 00:00 0.50 CEMT N WAIT PROD1 Circulate while waiting on Brine trucks. -Ice road blocked by trucks stuck in snow drifts. -84 gpm / 210 psi 3/31/2009 00:00 - 02:00 2.00 CEMT N WAIT PROD1 Continue to circulate waiting on trucks. -84 gpm / 200 psi. 02:00 - 03:00 1.00 CEMT P PROD1 Pump Hi Vis Spacer. - Displace 10.2 ppg mud with 567 bbls of 9.8 ppg NaCI brine. -500 gpm / 1060 psi. FCP 860 psi. 03:00 - 03:30 0.50 CASE P PROD1 LD 6 Jts of 5" DP. Rack back 1 Std of 5" DP to 8,237' md. 03:30 - 04:00 0.50 CASE P PROD1 PU RTTS & 1 Std of 5" DP. -Set RTTS 90' down. Back out Std & rack back in Derrick. -LD RTTS running tool. 04:00 - 04:30 0.50 CASE P PROD1 RU & test RTTS on Chart to 500 psi / 5 minutes - Pass. -Blow down Kill line, Choke line & pump out Stack. 04:30 - 07:00 2.50 CASE P PROD1 Pull Wear ring. PU Packoff running tool. -J -Hook into Packoff. BOLDS. Pull 9 5/8" Packoff. Printed: 5/11/2009 10:35:07 AM BP EXPLORATION Page 11 of 15 Operations Summary Report Legal Well Name: 4- 04A/T -30 Common Well Name: 4- 04A/T -30 Spud Date: Event Name: REENTER +COMPLETE Start: 3/18/2009 End: 4/5/2009 Contractor Name: DOYON DRILLING INC. Rig Release: 4/5/2009 Rig Name: DOYON 14 Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 3/31/2009 04:30 - 07:00 2.50 CASE P PROD1 - Replace Packoff & test to 5000 psi / 15 minutes - Pass. - Install Wear ring. LD running tool. 07:00 - 07:30 0.50 CASE P PROD1 PU RTTS running Tool & 1 Std of 5" DP. - Release RTTS, pull to surface. -LD RTTS. 07:30 - 12:00 4.50 CASE P PROD1 Change out Dies on Iron Roughneck. POH. -LD DP 1 X 1 from 8,519' to 2,383' md. 12:00 - 14:00 2.00 CASE P PROD1 Continue to LD 5" DP from 2,383' to surface. -Make service breaks & LD Polishing Mills. 14:00 - 14:30 0.50 CASE P PROD1 Pull Wear ring. 14:30 - 16:00 1.50 CASE P PROD1 RU to run 7" Tie -Back liner from 8,519' to surface. - Sim -Ops: -Load pipe shed with 7 ", TCII, 26 #, L -80 Liner. 16:00 - 00:00 8.00 CASE P PROD1 PJSM on running 7" Tie -Back Liner. -Run Tie -back Liner: - Torque Turn all connections. Use Stabbing guide. - Optimum Torque 10,100 ft/lbs. -Run Liner to 3,734' md. - Utilize "Jet Lube Seal Guard" Thread compound. - Install Straight vane centralizers on first 12 Jts. -Add one centralizer every other Jt for a total of 79. 4/1/2009 00:00 - 07:30 7.50 CASE P PROD1 Continue to Run Tie -back Liner: - Torque Turn all connections. Use Stabbing guide. - Optimum Torque 10,100 ft/lbs. -Run Liner from 3,734' to 8505' and (207 jts) - Utilize "Jet Lube Seal Guard" Thread compound. -Add one centralizer every other Jt for a total of 79. - Obtain parameters - PUW 230k - SOW 180k. 07:30 - 08:00 0.50 CASE P PROD1 Change Short Bales to long Bales. -RU circulating head on jt # 208 - PU same. 08:00 - 09:00 1.00 CASE P PROD1 Break circulation w/ 63 gpm / 50 psi. -Tag top of liner at 8,516' and - Stop pumps. -Slack off and tag no -go w/ 20 k down weight - Mark pipe. - Pressure to 500 psi - PU 10' and observe pressure drop. 09:00 - 10:00 1.00 CASE P PROD1 LD jt # 208. -PU space out pups. -PU BTC X TCII crossover pup. -Load and MU cement head. 10:00 - 12:00 2.00 CEMT P PROD1 Slack off and tag no -go to verify space out. -PU 10' - Break circ. w/ 252 gpm / 320 psi. - Circulate well until 90 degree F Brine around. -PJSM w/ all involved w/ upcoming cement job. 12:00 - 13:00 1.00 CEMT P PROD1 Give to Schlumberger: -Pump 3 bbls H2O. -Test lines to 4000 psi - Blow H2O back to pump truck. -Turn over to Little Red. -Pump 64 bbls diesel w/ 210 gpm / 500 psi. -Drop bottom plug. -Batch up and pump: - 156 bbls 15.8 ppg Class "G" cement. - (755 sx at 1.16 cft/sx yield). -210 gpm / 360 psi. Printed: 5/11/2009 10:35:07 AM • Page BP EXPLORATION P g Operations Summary Report Legal Well Name: 4- 04A/T -30 Common Well Name: 4- 04A/T -30 Spud Date: Event Name: REENTER +COMPLETE Start: 3/18/2009 End: 4/5/2009 Contractor Name: DOYON DRILLING INC. Rig Release: 4/5/2009 Rig Name: DOYON 14 Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 4/1/2009 12:00 - 13:00 1.00 CEMT P PROD1 -Drop top plug - Kick out w/ 5 bbls H2O 13:00 - 14:30 1.50 CEMT P PROD1 Displace cement w/ rig pumps using 9.8 ppg brine. -349 gpm / 200 psi - Caught up w/ cement at 215 bbls away. -Slow pumps to 294 gpm / 490 psi. -252 gpm / 1250 psi w/ 285 bbls away. -Slow to 84 gpm / 1460 psi - Bump plug w/ 3170 stks (320 bbls). - Pressure up to 3000 psi - Slack off 2'. -Bleed pressure - Set down on No -Go w/ 15k. - Pressure up to 2500 psi f/ 10 min. - Check floats - OK. -CIP at 1400 hrs. 14:30 - 15:00 0.50 CEMT P PROD1 Drain Stack. Suck out Landing Jt. -Clear Floor of Cementing & Csg Tools. 15:00 - 17:30 2.50 CLEAN P CLEAN Nipple down Flow line, Riser & Choke hose. -Split Stack below Spacer spool. 17:30 - 19:30 2.00 CLEAN P CLEAN Set Emergency slips w/ 210k. -Cut Tie -back Liner w/ WACHS cutter. 19:30 - 21:30 2.00 CLEAN P CLEAN LD landing Jt. Cut Jt = 11.20'. Break off Spacer spool. -Stand back Stack. Take out Spacer spool. -NU: Tbg spool & Double valve. -FMC test Spool 4200 psi / 15 minutes - Pass. 21:30 - 00:00 2.50 CLEAN P CLEAN NU BOP's. Remove spacer spool from Choke line. -NU same. Pull Riser & cut 8" off to fit. -C /O Saver sub on Top Drive. 4/2/2009 00:00 - 03:00 3.00 CLEAN P CLEAN Continue to nipple up Stack. -C /O Saver sub. -PJSM on change out upper Rams. - Change upper Rams from 4 1/2" X 7" to 3 1/2" X 6 ". 03:00 - 08:30 5.50 CLEAN P CLEAN RU to test BOP's. Test BOP's, Choke & associated valves: - - -BOP Configuration: - Hydril GK 13 5/8" 5000. -3 1/2" X 6" Variables. -Blind Rams. - Drilling Spool. -2 7/8" X 5" Variables. -Test Valves: 1,2,3,4,5,6,7,8,9,10,11,12,13 &14. -Test Manual valve, Kill, Choke, HCR Kill, Upper & Lower IBOP. -TIW & Dart valves. -Test Hydril to 250 low psi, 2500 high psi. -Test upper & lower Rams w/ 4" & 4 1/2" test jts. -Test 250 low psi & 3,500 psi High psi. -Hold each test for 5 charted minutes All Pass. -Test witnessed by T.P. & WSL. -Test witness waived by Lou Grimaldi AOGCC. - System psi =3050 psi. 200 psi increase = 31 seconds. -Full psi = 2 minutes 43 seconds. -4 bottles X 2200 psi. Install Wear ring. RD test equipment. 08:30 - 09:30 1.00 CLEAN P CLEAN Install Bales & Elevators. C/O inserts in Airslips. Printed: 5/11/2009 10:35:07 AM • • BP EXPLORATION Page 13 of 15 Operations Summary Report Legal Well Name: 4- 04A/T -30 Common Well Name: 4- 04A/T -30 Spud Date: Event Name: REENTER +COMPLETE Start: 3/18/2009 End: 4/5/2009 Contractor Name: DOYON DRILLING INC. Rig Release: 4/5/2009 Rig Name: DOYON 14 Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 4/2/2009 08:30 - 09:30 1.00 CLEAN P CLEAN -Get OD / ID & lengths of cleanout BHA. 09:30 - 11:30 2.00 CLEAN P CLEAN MU cleanout BHA: Bit, Boot baskets (2), Scraper & Bit sub. -MU XO & 4 3/4" D.C's (9). 11:30 - 12:00 0.50 CLEAN P CLEAN PU DP 1 X 1 from pipeshed to 300' md. 12:00 - 18:00 6.00 CLEAN P CLEAN Continue to PU 4" DP. -PU DP 1 X 1 from pipe shed from 300' to 8,318' md. 18:00 - 00:00 6.00 CLEAN P CLEAN PU a single & Tag cement @ 8,320' md. -PUW 180k, SOW 119k, ROT wt 140k. -290 gpm / 1250 psi. WOB 8k. RPM 80 / 6k Tq. -Drill cement from 8,320' to Float collar @ 8,408' md. -Drill F.C. & wipe. - Continue drilling cement from 8,408' to F.0 © 8,509' md. -Drill F.C. & wipe. - Continue drilling cement from 8,509' to 8,695' md. - Taking 6 -8k WOB. 4/3/2009 00:00 - 01:00 1.00 CLEAN P CLEAN Continue to drill Cmt from 8,695' to 8,854' md. -PUW 182k, SOW 115k, ROT wt 144k. -294 gpm / 1370 psi. WOB 8k. 80 RPM / 6k Tq. 01:00 - 04:00 3.00 CLEAN P CLEAN Continue to RIH w/ 4" DP 1 X 1. -RIH 1 X 1 from 8,854' to 12,491' md. -Wiped liner several times. -Wipe from 12,000' to 12,100' and Packer setting depth. 04:00 - 04:30 0.50 CLEAN P CLEAN Wash down from 12,941 to 12,500' md. - Tagged © 12,500' md. -252 gpm / 1300 psi. PUW 270k, SOW 145k. 04:30 - 07:00 2.50 CLEAN P CLEAN PJSM on displace to Seawater. - Displace to Seawater from 9.8 ppg NaCI brine & 10.2 ppg LSND. - Reciprocate & rotate. 60 RPM / 11 k Tq. -PUW 270k, SOW 145k, ROT wt 184k. 07:00 - 08:00 1.00 CLEAN P CLEAN RU test equipment. -Test casing to 3500 psi for 30 min on chart - Pass. -RD test equipment. -Blow down lines. 08:00 - 12:00 4.00 CLEAN P CLEAN PJSM on laying down DP. -Lay down DP from 12,500' - 8,256' md. 12:00 - 12:30 0.50 CLEAN P CLEAN Inspect and Service Rig. - Service Top Drive, Blocks, Drawworks. 12:30 - 17:30 5.00 CLEAN P CLEAN Continue laying down DP. -LD 4" DP from 8,256' - 277' md. 17:30 - 18:30 1.00 CLEAN P CLEAN Lay down BHA: -(9) 4.75" D,C's, 6.125" Bit, Boot Baskets & Casing Scraper. 18:30 - 19:00 0.50 CLEAN P CLEAN PU Wear ring puller. BOLDS. Pull Wear ring. -LD Wear ring & wear ring puller. 19:00 - 19:30 0.50 CLEAN P CLEAN Clean & Clear floor. 19:30 - 20:30 1.00 CLEAN P CLEAN PJSM -Cut and slip 59.5' Drilling line. 20:30 - 22:30 2.00 RUNCOMP RUNCMP LD short Bales. -PU & install Long Bales, Compensator sub, Compensator, -PU: Elevators, Slips, Power Tongs & Torque Turn equipment. 22:30 - 00:00 1.50 RUNCOMP RUNCMP PJSM on running 4 1/2" Tbg. Run 4 1/2 ", 12.6 #, 13Cr Vam Top Tbg From surface to 500' md. Printed: 5/11/2009 10:35:07 AM IP/ BP EXPLORATION Page 14 of 15 Operations Summary Report Legal Well Name: 4- 04A/T -30 Common Well Name: 4- 04A/T -30 Spud Date: Event Name: REENTER +COMPLETE Start: 3/18/2009 End: 4/5/2009 Contractor Name: DOYON DRILLING INC. Rig Release: 4/5/2009 Rig Name: DOYON 14 Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 4/3/2009 22:30 - 00:00 1.50 RUNCO P RUNCMP - Utilize "Jet Lube Seal Guard" thread compound. - Optimum torque 4440 ft/Ibs. -Baker Lok all connections below Packer. 4/4/2009 00:00 - 12:00 12.00 RUNCOMP RUNCMP Continue to run 4 1/2" Tbg. -Run 4 1/2 ", 12.6 #, 13Cr Vam Top Tbg From 500' to 10,552' md. - Utilize "Jet Lube Seal Guard" thread compound. - Optimum torque 4440 ft/lbs. 12:00 - 12:30 0.50 RUNCOMP RUNCMP Inspect & service Top Drive, Blocks & Drawworks. 12:30 - 13:00 0.50 RUNCOMP RUNCMP MU 1 Jt of 4 1/2" Tbg w/ HES HXO SSSV, landing nipple. 13:00 - 14:00 1.00 RUNCOMP RUNCMP Remove Air slips. - Mobilize Control line spools. Hang sheave. -MU & test control lines to 5000 psi / 10 minutes - Pass. 14:00 - 16:30 2.50 RUNCOMP RUNCMP Continue to RIH w/ 4 1/2" Tbg. -RIH from 10,620' to 12,078' md. PUW 215k, SOW 130k. 16:30 - 17:00 0.50 RUNCOMP RUNCMP During Ops to PU Tbg hanger observed the XO pup was backwards. -TCII pin was down, Vam Top pin was up in Tbg hanger. -Start circulating operations while waiting on new Tbg Hanger. MU Vam Top XO & Head pin. RU injection line to IA. 17:00 - 19:00 2.00 RUNCOMP RUNCMP Reverse circulate in clean Seawater surface to surface. -126 gpm / 360 psi. 19:00 - 21:30 2.50 RUNCOMP RUNCMP MU Tbg hanger & landing Jt. -Tie in control lines. Test control lines to 5000 psi / 10 minutes - Pass. -Land 4 1/2" Tbg @ 12,108' md. RILDS. -Ran 39 Stainless steel bands. 21:30 - 23:00 1.50 RUNCOMP RUNCMP RU to reverse circulate. - Reverse circulate in Corrosion Inhibitor. -126 gpm / 380 psi. 23:00 - 00:00 1.00 RUNCOMP RUNCMP RU to pump down Tbg. Drop Ball & Rod. - Pressure 4p to 3500 psi to set Packer. -Set Packer. -Test Tbg to 3500 psi for 30 minutes on Chart - Pass. 4/5/2009 00:00 - 01:30 1.50 RUNCOMP RUNCMP Continue to test TBG to 3500 psi / 30 minutes - Pass. -Bleed Tbg pressure down to 2000 psi. - Pressure up Annulus to 3500 psi hold for 30 minutes. -Bleed pressure of Tbg. Sheared @ 3200 psi. - Circulate both ways to confirm T X IA communication. 01:30 - 02:00 0.50 RUNCOMP RUNCMP Install TWC. -Test TWC on chart to 1000 psi / 10 minutes - Pass. 02:00 - 04:00 2.00 BOPSUF P RUNCMP PJSM on ND BOP Stack. -Blow down Choke & Kill lines. - Remove: Flow line, Hole fill, Bleed off, Riser & Choke line. - Remove Accumulator lines from Stack. -ND BOP Stack. 04:00 - 09:00 5.00 WHSUR P RUNCMP SLB -test control lines to 5000 psi / 5 minutes - Pass. -MU Adaptor flange. -Test Adaptor flange to 5000 psi / 10 minutes - Pass. - Install Tree. -SIM Ops- RD Rock washer and move. -Pull conveyor into Rig. Put braces on Star Wars. Printed: 5/11/2009 10:35:07 AM • BP EXPLORATION Page 15 of 15 Operations Summary Report Legal Well Name: 4- 04A/T -30 Common Well Name: 4- 04A/T -30 Spud Date: Event Name: REENTER +COMPLETE Start: 3/18/2009 End: 4/5/2009 Contractor Name: DOYON DRILLING INC. Rig Release: 4/5/2009 Rig Name: DOYON 14 Rig Number: Date From - To Hours Task Code NPT Phase Description of Operations 4/5/2009 04:00 - 09:00 5.00 WHSUR P RUNCMP - Electrician service motors on Top Drive. 09:00 - 10:00 1.00 WHSUR P RUNCMP RU to test Tree. Test Tree to 5000 psi / 10 minutes - Pass. 10:00 - 11:00 1.00 WHSUR P RUNCMP PU Lubricator & test to 500 psi - Pass. -Pull TWC. -SIM Ops - Install Front Boosters. 11:00 - 12:00 1.00 WHSUR P RUNCMP PJSM. RU Hot Oil & Hot Oil to pump 10 bbls of diesel. -Test lines to 3000 psi. -Pump diesel @ 42 gpm / 300 psi. 12:00 - 14:00 2.00 WHSUR P RUNCMP U -Tube diesel for 45 minutes. LRS vacuum back lines. - Remove pressure hose. - Install pressure sensor. 14:00 - 16:00 2.00 WHSUR P RUNCMP Install BPV & test w/ LRS to 1000 psi / 5 minutes on chart. -Bleed down. Release LRS. 16:00 - 17:59 1.98 WHSUR P RUNCMP RD all 1502 equipment. - Remove secondary IA valve. Install blank flange. -RD Pump -in flange on wing valve. - Install blank flange & gauges. -Clean cellar box. -T/I/0 = 0/0/25 psi 17:59 - 18:00 0.02 WHSUR N MISC RUNCMP Release Rig @ 18:00 hrs Printed: 5/11/2009 10:35:07 AM END 4- 04A/T -30 Well History Date Summary 04/05/09 T /I /O =0/0/0 Pulled 4" CIW "H" TWC #283 Thru Tree (N /U) Doyon 14; 1 -2' Ext. Used, Tagged @ 96 ". 04/12/09 T /I /O = 0/0/100 Attempted to pull 2" FMC V/R Plug from I /A, no plug remained (removed earlier)... Requested by Well Tender to swap valve from O/A backside (flowline) to front side ...after further discussion with OTL/Well Tender it was deemed not necessary to perform this task. 04/14/09 T /I /O = 0/100/100 Pulled 4 1/16" CIW H BPV 04/17/09 PULLED 4 -1/2" DSSSV @ 1,494' SLM /1,509' MD. PULLED BALL & ROD @ 12,032' SLM . PULL STA# 4 DGLV @ 7,132' SLM/ 7139' MD & STA# 5 DCK SHEAR VLV @ 3,533' SLM/ 3,546' MD. SET GENERIC GLV'S IN STA'S #5 & #4. PULLED EMPTY 4 -1/2" RHC PLUG BODY @ 12,040' SLM/ 12,085' MD. TAGGED HARD TD @ 12,495' MD W/ 3 -3/8" DMY GUN, TEL & S- BAILER. TARGET DEPTH= 12,485' MD. RETRIEVED SAMPLE OF WHAT APPEARS TO BE MUD. 04/19/09 T /I /O /OO= SSVNAC /40/10. Temp= SI. Eval well for hardline rigup (Evacuate CSG, TBG). There is a poorboy GL running from END4 -26 to END4 -10, hardline can be run from the tee outside END4 -10, to the IA on END4 -04 for gas lift. Hardline can be rigged up from END4 -04 TBG to END4 -06 tree cap. Another option for flowing the well is to use the flowline, which is nearly complete (contact Jeremy Grimes). SV,WV,SSV =C. MV =O. IA,OA =OTG. NOVP. 04/23/09 ASRC Test Unit #3, S/B for perfs, 04/24/09 ASRC Test Unit #3, S/B for E -line Perf, 04/24/09 T /I /O= 0/0/0 Removed OOA ANSI 1500# Flange. Installed API 5,000# Flange. Pressure Tested to 5000 psi. (PASSED). Bled to 0 psi. Wellhead Repair. 04/26/09 T /I /O /OO = 2000/2050/100/0. RIG UP E -LINE. RUN PDC LOG FROM SURFACE TO TD AND SCMT FOR CEMENT EVALUATION FROM TD- 8450'. 04/27/09 RUN JEWELRY LOG FROM TD TO GLM #1. PERFORATE 12332'- 12352' & 12465'- 12485' WITH 3 -3/8" PJ 6SPF 60 DEG PHASING HSD GUNS. CORRELATE TO SWS JEWELRY LOG 04/28/09 PERFORATE 12416'- 12429', 12289'- 12311' & 12255'- 12277' WITH 3 -3/8" PJ 6SPF 60 DEG PHASING HSD GUNS 04/29/09 PERFORATE 12200'- 12224' WITH 3 -3/8" PJ 6SPF 60 DEG PHASING HSD GUNS FINAL T /I /O = 1170/1300/100. RIG DOWN E -LINE VALVES LEFT AS FOUND (SSV CLOSED, DSO WILL PUMP UP PANEL). 05/08/09 SET WHIDDON CATCHER SUB @ 12079' SLM/ 12085' MD PULLED BK -DGLV FROM STA # 1 @ 11907' SLM/ 11911' MD, STA #3 @ 9755' SLM/9762' MD PULLED BK -DGLV FROM STA #2 @ 11002' SLM / 11004' MD 05/09/09 PULL BK -OGLV STA.4 @ 7135' SLM /7139' MD, PULL BK -LGLV STA.5 @ 3539' SLM/3546' MD SET BK -LGLV STA.5 @ 3539' SLM/3546' MD SET BK -LGLV STA.4 @ 7135' SLM7139' MD, SET BK -LGLV STA.3 @ 9755' SLM/9762' MD, SET BK -LGLV STA.2 @ 11002' SLM /11004' MD SET BK -OGLV STA.1 @ 11907' SLM/11911' MD, PULL WHIDDON CATCHER SUB @ 12079' SLM/12085' MD RAN 2.5 "CENT, AND 2 1/2" SAMPLE BAILER, SD @ 12478' SLM, RECOVER TWO CUPS OF WHAT APPEARS TO BE SAND RAN SCHLUMBERGER GAMA RAY CCL MEMORY TOOL TO 12478' SLM, LOGGED TO 10900' SLM(good data) Page 1 of 2 • END 4- 04A/T -30 Well History Date Summary 05/10/09 BRUSH SVLN @ 1495' SLM /1509' MD SET 4 1/2" BBE SSSV @ 1495' SLM /1509' MD), (SERIAL # NBB -24) GOOD CLOSURE TEST Page 2 of 2 BP EXPLORATION Page 1 of 1 Leak -Off Test Summary Legal Name: 4- 04A/T -30 Common Name: 4- 04A/T -30 Test Date Test Type Test Depth (TMD) Test Depth (TVD) AMW Surface Pressure Leak Off Pressure (BHP) EMW 3/23/2009 FIT 8,728.0 (ft) 6,879.0 (ft) 9.10 (ppg) 860 (psi) 4,112 (psi) 11.51 (ppg) i S Printed: 5/11/2009 10:35:01 AM . bp s, .. SCIIIUMberger 4- 04A/T -30 Survey Report Report Date: March 30, 2009 Survey / DLS Computation Method: Minimum Curvature / Lubinski Client: BP Exploration Alaska Vertical Section Azimuth: 294.260° Field: Endicott Vertical Section Origin: N 0.000 ft, E 0.000 ft Structure / Slot: SDI / 4 -04 TVD Reference Datum: Rotary Table Well: 4- 04/T -26 TVD Reference Elevation: 48.05 ft relative to MSL Borehole: 4- 04A/T -30 Sea Bed / Ground Level Elevation: 14.50 ft relative to MSL UWI /API #: 500292196801 Magnetic Declination: 23.178° Survey Name / Date: 4- 04A/T -30 / March 23, 2009 Total Field Strength: 57734.479 nT Tort / AHD / DDI / ERD ratio: 188.481° / 5420.50 ft / 6.094 / 0.522 Magnetic Dip: 81.022° Grid Coordinate System: NAD27 Alaska State Planes, Zone 03, US Feet Declination Date: Mardi 23, 2009 Location Lat/Long: N 701918.597, W 14751 48.321 Magnetic Declination Model: BGGM 2008 Location Grid N/E Y/X: N 5970797.440 ftUS, E 270191.510 ftUS North Reference: True North Grid Convergence Angle: - 1.75466703° Total Corr Mag North -> True North: +23.178° Grid Scale Factor: 0.99995999 Local Coordinates Referenced To: Well Head Measured Azimuth Vertical Along Hole NS EW Comments Depth Inclination True Sub -Sea TVD TVD Section Departure Closure True North True North DLS Northing Easting Latitude Longitude _ (ft) (deg) (deg) (ft) _ (ft) (ft) (ft) (ft) (ft) (ft) (deg/100ft) (ftUS) (ftUS) RTE 0.00 0.00 0.00 -48.05 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5970797.44 270191.51 N 70 19 18.597 W 147 51 48.321 WRP 33.55 0.00 0.00 -14.50 33.55 0.00 0.00 0.00 0.00 0.00 0.00 5970797.44 270191.51 N 70 19 18.597 W 147 51 48.321 GCT -MS 36.40 0.62 232.89 -11.65 36.40 0.01 0.02 0.02 -0.01 -0.01 21.75 5970797.43 270191.50 N 70 19 18.597 W 147 51 48.322 47.00 0.40 217.31 -1.05 47.00 0.04 0.11 0.11 -0.07 -0.08 2.44 5970797.37 270191.43 N 70 19 18.597 W 147 51 48.324 57.60 0.37 209.35 9.55 57.60 0.05 0.18 0.18 -0.13 -0.12 0.58 5970797.31 270191.39 N 70 19 18.596 W 147 51 48.325 68.20 0.42 207.99 20.15 68.20 0.06 0.25 0.25 -0.20 -0.15 0.48 5970797.25 270191.35 N 7019 18.596 W 147 51 48.326 78.80 0.47 208.47 30.75 78.80 0.07 0.34 0.33 -0.27 -0.19 0.47 5970797.18 270191.31 N 70 19 18.595 W 147 51 48.327 87.70 0.50 208.98 39.65 87.70 0.07 0.41 0.41 -0.34 -0.23 0.34 5970797.11 270191.27 N 70 19 18.594 W 147 51 48.328 94.00 0.53 209.47 45.95 94.00 0.08 0.47 0.46 -0.38 -0.26 0.48 5970797.06 270191.24 N 70 19 18.594 W 147 51 48.329 108.80 0.58 210.35 60.75 108.80 0.09 0.61 0.61 -0.51 -0.33 0.34 5970796.94 270191.17 N 70 19 18.592 W 147 51 48.331 122.70 0.58 208.67 74.65 122.70 0.10 0.75 0.75 -0.63 -0.40 0.12 5970796.82 270191.09 N 70 19 18.591 W 147 51 48.333 136.65 0.57 206.68 88.60 136.65 0.11 0.89 0.89 -0.76 -0.46 0.16 5970796.70 270191.02 N 70 19 18.590 W 147 51 48. 150.65 0.52 207.90 102.60 150.65 0.12 1.02 1.02 -0.87 -0.52 0.37 5970796.58 270190.96 N 70 19 18.589 W 147 51 48. 164.75 0.42 209.00 116.69 164.74 0.13 1.14 1.13 -0.98 -0.58 0.71 5970796.48 270190.90 N 70 19 18.588 W 147 51 48.338 178.75 0.35 207.26 130.69 178.74 0.13 1.23 1.23 -1.06 -0.62 0.51 5970796.40 270190.85 N 70 19 18.587 W 147 51 48.340 192.90 0.32 203.91 144.84 192.89 0.14 1.32 1.31 -1.13 -0.66 0.25 5970796.33 270190.82 N 70 19 18.586 W 147 51 48.341 207.05 0.27 199.12 158.99 207.04 0.13 1.39 1.38 -1.20 -0.69 0.39 5970796.26 270190.79 N 70 19 18.586 W 147 51 48.341 221.15 0.23 195.48 173.09 221.14 0.13 1.45 1.44 -1.26 -0.70 0.31 5970796.20 270190.77 N 70 19 18.585 W 147 51 48.342 235.30 0.20 192.49 187.24 235.29 0.12 1.50 1.49 -1.31 -0.72 0.23 5970796.15 270190.75 N 70 19 18.585 W 147 51 48.342 249.50 0.18 189.51 201.44 249.49 0.11 1.55 1.54 -1.36 -0.73 0.16 5970796.11 270190.74 N 70 19 18.584 W 147 51 48.343 263.70 0.18 190.09 215.64 263.69 0.09 1.60 1.58 -1.40 -0.73 0.01 5970796.06 270190.73 N 70 19 18.584 W 147 51 48.343 277.90 0.18 191.02 229.84 277.89 0.08 1.64 1.62 -1.44 -0.74 0.02 5970796.02 270190.72 N 70 19 18.583 W 147 51 48.343 292.10 0.17 190.20 244.04 292.09 0.07 1.68 1.67 -1.49 -0.75 0.07 5970795.98 270190.71 N 70 19 18.583 W 147 51 48.343 SurveyEditor Ver SP 2.1 Bld( users) 4- 04\ 4- 04/T- 26 \4- 04A/T- 30 \4- 04A!T -30 Generated 5/19/2009 12:27 PM Page 1 of 11 . Measured Azimuth Vertical Along Hole NS EW Comments Inclination Sub -Sea TVD TVD Closure DLS Northing Easting Latitude Longitude Depth True Section Departure True North True North (ft ) (deg) (deg) (ft) _ (ft) (ft) (ft ) (ft ) (ft) (ft ) (deg/100ft ) (ftUS) (ftUS) 306.40 0.15 189.45 258.34 306.39 0.06 1.72 1.70 -1.53 -0.76 0.14 5970795.94 270190.71 N 70 19 18.582 W 147 51 48.344 320.70 0.12 190.84 272.64 320.69 0.06 1.76 1.74 -1.56 -0.76 0.21 5970795.90 270190.70 N 70 19 18.582 W 147 51 48.344 335.00 0.10 195.29 286.94 334.99 0.05 1.79 1.76 -1.59 -0.77 0.15 5970795.88 270190.69 N 70 19 18.582 W 147 51 48.344 349.25 0.08 200.03 301.19 349.24 0.05 1.81 1.79 -1.61 -0.78 0.15 5970795.86 270190.68 N 70 19 18.582 W 147 51 48.344 363.45 0.05 238.08 315.39 363.44 0.05 1.82 1.80 -1.62 -0.78 0.36 5970795.84 270190.68 N 70 19 18.582 W 147 51 48.344 377.65 0.03 293.92 329.59 377.64 0.06 1.83 1.81 -1.62 -0.79 0.29 5970795.84 270190.67 N 70 19 18.582 W 147 51 48.345 391.75 0.05 304.81 343.69 391.74 0.07 1.84 1.81 -1.62 -0.80 0.15 5970795.85 270190.66 N 70 19 18.582 W 147 51 48.345 405.75 0.07 294.86 357.69 405.74 0.08 1.86 1.80 -1.61 -0.81 0.16 5970795.86 270190.65 N 70 19 18.582 W 147 51 48.345 419.65 0.13 347.79 371.59 419.64 0.10 1.88 1.79 -1.59 -0.83 0.75 5970795.87 270190.64 N 70 19 18.582 W 147 51 48.346 433.65 0.38 42.26 385.59 433.64 0.09 1.94 1.74 -1.54 -0.80 2.30 5970795.92 270190.67 N 70 19 18.582 W 147 51 48.345 447.70 0.78 41.89 399.64 447.69 0.05 2.08 1.60 -1.44 -0.70 2.85 5970796.03 270190.76 N 70 19 18.583 W 147 51 48.342 461.75 1.08 40.33 413.69 461.74 -0.01 2.31 1.38 -1.26 -0.55 2.14 5970796.19 270190.92 N 70 19 18.585 W 147 51 48. 475.90 1.13 41.59 427.84 475.89 -0.09 2.58 1.12 -1.06 -0.37 0.39 5970796.39 270191.10 N 70 19 18.587 W 147 51 48. 489.95 0.93 46.30 441.89 489.94 -0.18 2.83 0.90 -0.88 -0.20 1.54 5970796.57 270191.28 N 70 19 18.589 W 147 51 48.327 504.10 0.62 67.73 456.03 504.08 -0.27 3.02 0.77 -0.77 -0.05 2.96 5970796.68 270191.44 N 70 19 18.590 W 147 51 48.323 518.20 0.60 113.62 470.13 518.18 -0.40 3.16 0.77 -0.77 0.09 3.38 5970796.67 270191.58 N 7019 18.590 W 147 51 48.319 532.25 1.05 147.29 484.18 532.23 -0.58 3.36 0.93 -0.91 0.23 4.58 5970796.53 270191.71 N 70 19 18.589 W 147 51 48.315 546.30 1.62 158.08 498.23 546.28 -0.83 3.69 1.25 -1.20 0.37 4.42 5970796.23 270191.85 N 70 19 18.586 W 147 51 48.311 560.20 2.22 165.25 512.12 560.17 -1.14 4.15 1.72 -1.64 0.51 4.64 5970795.78 270191.97 N 70 19 18.581 W 147 51 48.306 574.15 2.77 171.52 526.06 574.11 -1.50 4.76 2.32 -2.24 0.63 4.40 5970795.19 270192.07 N 70 19 18.575 W 147 51 48.303 588.15 3.28 176.28 540.04 588.09 -1.87 5.50 3.05 -2.97 0.71 4.06 5970794.45 270192.13 N 70 19 18.568 W 147 51 48.301 602.25 3.68 179.02 554.11 602.16 -2.25 6.35 3.90 -3.82 0.74 3.07 5970793.59 270192.14 N 70 19 18.560 W 147 51 48.300 616.35 4.07 181.08 568.18 616.23 -2.64 7.31 4.83 -4.78 0.74 2.94 5970792.64 270192.10 N 70 19 18.550 W 147 51 48.300 630.45 4.48 182.73 582.24 630.29 -3.04 8.36 5.87 -5.83 0.71 3.04 5970791.59 270192.04 N 70 19 18.540 W 147 51 48.301 644.55 4.75 183.45 596.29 644.34 -3.45 9.49 6.99 -6.96 0.64 1.96 5970790.46 270191.94 N 70 19 18.529 W 147 51 48.303 658.65 4.88 184.24 610.34 658.39 -3.86 10.67 8.16 -8.14 0.56 1.03 5970789.29 270191.83 N 70 19 18.517 W 147 51 48.305 672.75 5.00 185.18 624.39 672.44 -4.27 11.89 9.36 -9.35 0.47 1.03 5970788.08 270191.69 N 7019 18.505 W 147 51 48.308 686.85 5.07 185.89 638.44 686.49 -4.66 13.13 10.59 -10.58 0.35 0.66 5970786.85 270191.53 N 70 19 18.493 W 147 51 48.311 700.95 5.15 186.29 652.48 700.53 -5.05 14.38 11.83 -11.83 0.21 0.62 5970785.61 270191.36 N 70 19 18.481 W 147 51 48.31 715.05 5.23 186.34 666.52 714.57 -5.45 15.66 13.10 -13.10 0.07 0.57 5970784.35 270191.18 N 70 19 18.469 W 147 51 48 729.10 5.27 186.34 680.52 728.57 -5.84 16.94 14.38 -14.38 -0.07 0.28 5970783.07 270191.00 N 70 19 18.456 W 147 51 48. 743.20 5.28 186.26 694.56 742.61 -6.24 18.24 15.67 -15.67 -0.21 0.09 5970781.79 270190.82 N 70 19 18.443 W 147 51 48.328 757.30 5.28 186.10 708.60 756.65 -6.65 19.54 16.96 -16.96 -0.35 0.10 5970780.50 270190.64 N 70 19 18.431 W 147 51 48.332 771.40 5.28 186.04 722.64 770.69 -7.05 20.83 18.25 -18.25 -0.49 0.04 5970779.22 270190.46 N 70 19 18.418 W 147 51 48.336 785.50 5.23 186.06 736.68 784.73 -7.45 22.13 19.54 -19.53 -0.63 0.35 5970777.94 270190.29 N 70 19 18.405 W 147 51 48.340 799.60 5.18 186.08 750.72 798.77 -7.85 23.41 20.82 -20.80 -0.76 0.35 5970776.67 270190.11 N 70 19 18.393 W 147 51 48.344 813.70 5.08 185.92 764.76 812.81 -8.25 24.67 22.07 -22.06 -0.89 0.72 5970775.42 270189.94 N 70 19 18.381 W 147 51 48.347 827.80 5.00 185.68 778.81 826.86 -8.64 25.90 23.31 -23.29 -1.02 0.59 5970774.19 270189.78 N 70 19 18.368 W 147 51 48.351 841.90 4.93 185.42 792.85 840.90 -9.03 27.13 24.53 -24.50 -1.14 0.52 5970772.98 270189.62 N 70 19 18.356 W 147 51 48.355 856.00 4.90 185.25 806.90 854.95 -9.42 28.33 25.74 -25.71 -1.25 0.24 5970771.79 270189.48 N 70 19 18.345 W 147 51 48.358 870.10 4.88 185.20 820.95 869.00 -9.82 29.54 26.94 -26.90 -1.36 0.15 5970770.59 270189.33 N 70 19 18.333 W 147 51 48.361 SurveyEditor Ver SP 2.1 Bld( users) 4- 04\ 4- 04/T- 26 \4- 04A/T- 30 \4- 04A/T -30 Generated 5/19/2009 12:27 PM Page 2 of 11 Measured Azimuth Vertical Along Hole NS EW Comments Depth Inclination True Sub -Sea TVD TVD Section Departure Closure True North True North DLS Northing Easting Latitude Longitude (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) _ (ft) (ft ) (deg/100ft ) (ftUS) (ftUS) 884.25 4.82 184.88 835.05 883.10 -10.21 30.73 28.13 -28.09 -1.46 0.47 5970769.41 270189.19 N 70 19 18.321 W 147 51 48.364 898.35 4.80 184.66 849.10 897.15 -10.60 31.91 29.31 -29.27 -1.56 0.19 5970768.23 270189.05 N 70 19 18.310 W 147 51 48.367 912.45 4.80 184.55 863.15 911.20 -11.00 33.09 30.49 -30.45 -1.66 0.07 5970767.06 270188.92 N 70 19 18.298 W 147 51 48.370 926.55 4.82 184.38 877.20 925.25 -11.40 34.28 31.68 -31.63 -1.75 0.17 5970765.88 270188.80 N 70 19 18.286 W 147 51 48.372 940.70 4.82 184.35 891.30 939.35 -11.81 35.46 32.86 -32.81 -1.84 0.02 5970764.70 270188.67 N 70 19 18.275 W 147 51 48.375 954.85 4.83 184.29 905.40 953.45 -12.21 36.66 34.05 -34.00 -1.93 0.08 5970763.52 270188.54 N 70 19 18.263 W 147 51 48.378 968.95 4.83 184.20 919.45 967.50 -12.62 37.84 35.24 -35.18 -2.02 0.05 5970762.34 270188.42 N 70 19 18.251 W 147 51 48.380 983.05 4.85 184.29 933.50 981.55 -13.03 39.03 36.43 -36.37 -2.10 0.15 5970761.15 270188.29 N 70 19 18.240 W 147 51 48.383 997.05 4.88 184.36 947.45 995.50 -13.43 40.22 37.62 -37.55 -2.19 0.22 5970759.97 270188.17 N 70 19 18.228 W 147 51 48.385 1011.00 4.88 184.34 961.35 1009.40 -13.83 41.41 38.80 -38.74 -2.28 0.01 5970758.79 270188.04 N 70 19 18.216 W 147 51 48.388 1025.10 4.88 184.39 975.40 1023.45 -14.24 42.61 40.00 -39.93 -2.37 0.03 5970757.60 270187.91 N 70 19 18.205 W 147 51 48.391 1039.20 4.92 184.41 989.45 1037.50 -14.65 43.81 41.21 -41.13 -2.47 0.28 5970756.40 270187.79 N 70 19 18.193 W 147 51 48. 1053.40 4.93 184.38 1003.60 1051.65 -15.07 45.03 42.43 -42.35 -2.56 0.07 5970755.19 270187.65 N 70 19 18.181 W 147 51 48. 1067.55 4.95 184.35 1017.69 1065.74 -15.48 46.25 43.64 -43.56 -2.65 0.14 5970753.98 270187.52 N 70 19 18.169 W 147 51 48.399 1081.70 4.95 184.10 1031.79 1079.84 -15.90 47.47 44.87 -44.78 -2.74 0.15 5970752.76 270187.40 N 70 19 18.157 W 147 51 48.401 1095.85 4.95 184.04 1045.89 1093.94 -16.32 48.69 46.09 -46.00 -2.83 0.04 5970751.55 270187.27 N 70 19 18.145 W 147 51 48.404 1110.05 4.95 184.20 1060.03 1108.08 -16.74 49.91 47.31 -47.22 -2.92 0.10 5970750.33 270187.15 N 70 19 18.133 W 147 51 48.407 1124.20 4.97 184.07 1074.13 1122.18 -17.16 51.14 48.54 -48.44 -3.01 0.16 5970749.11 270187.02 N 70 19 18.121 W 147 51 48.409 1138.35 4.98 183.92 1088.23 1136.28 -17.59 52.37 49.76 -49.67 -3.09 0.12 5970747.89 270186.90 N 70 19 18.109 W 147 51 48.412 1152.55 4.98 183.91 1102.37 1150.42 -18.02 53.60 50.99 -50.90 -3.18 0.01 5970746.67 270186.78 N 70 19 18.097 W 147 51 48.414 1166.65 4.95 184.01 1116.42 1164.47 -18.44 54.82 52.22 -52.11 -3.26 0.22 5970745.45 270186.66 N 70 19 18.085 W 147 51 48.417 1180.85 4.93 184.07 1130.57 1178.62 -18.86 56.04 53.44 -53.33 -3.35 0.15 5970744.24 270186.53 N 70 19 18.073 W 147 51 48.419 1195.00 4.88 183.86 1144.67 1192.72 -19.28 57.25 54.65 -54.54 -3.43 0.38 5970743.03 270186.41 N 70 19 18.061 W 147 51 48.421 1209.10 4.87 183.67 1158.72 1206.77 -19.70 58.45 55.85 -55.74 -3.51 0.13 5970741.84 270186.30 N 70 19 18.049 W 147 51 48.424 1223.10 4.85 183.70 1172.67 1220.72 -20.12 59.64 57.03 -56.92 -3.58 0.14 5970740.66 270186.18 N 70 19 18.038 W 147 51 48.426 1237.00 4.83 183.60 1186.52 1234.57 -20.53 60.81 58.21 -58.09 -3.66 0.16 5970739.49 270186.07 N 7019 18.026 W 147 51 48.428 1251.00 4.80 183.38 1200.47 1248.52 -20.95 61.98 59.38 -59.26 -3.73 0.25 5970738.32 270185.97 N 70 19 18.015 W 147 51 48.430 1264.90 4.78 183.62 1214.32 1262.37 -21.36 63.14 60.54 -60.42 -3.80 0.20 5970737.17 270185.86 N 70 19 18.003 W 147 51 48.432 1278.90 4.82 184.00 1228.27 1276.32 -21.77 64.32 61.71 -61.59 -3.88 0.36 5970736.00 270185.75 N 70 19 17.992 W 147 51 48.435 1292.90 4.85 184.05 1242.22 1290.27 -22.18 65.50 62.89 -62.77 -3.96 0.22 5970734.83 270185.63 N 70 19 17.980 W 147 51 48. 1306.85 4.83 183.90 1256.12 1304.17 -22.59 66.67 64.07 -63.94 -4.04 0.17 5970733.65 270185.51 N 70 19 17.969 W 147 51 48. 1320.80 4.83 183.64 1270.02 1318.07 -23.00 67.85 65.24 -65.11 -4.12 0.16 5970732.49 270185.40 N 70 19 17.957 W 147 51 48.442 1334.75 4.80 183.43 1283.92 1331.97 -23.41 69.02 66.41 -66.28 -4.19 0.25 5970731.32 270185.29 N 7019 17.946 W 147 51 48.444 1348.75 4.77 183.26 1297.87 1345.92 -23.83 70.19 67.58 -67.45 -4.26 0.24 5970730.16 270185.19 N 70 19 17.934 W 147 51 48.446 1362.65 4.73 183.06 1311.72 1359.77 -24.24 71.34 68.73 -68.60 -4.32 0.31 5970729.01 270185.09 N 70 19 17.923 W 147 51 48.448 1376.65 4.68 182.85 1325.68 1373.73 -24.66 72.49 69.88 -69.74 -4.38 0.38 5970727.87 270184.99 N 70 19 17.912 W 147 51 48.449 1390.65 4.65 182.45 1339.63 1387.68 -25.08 73.62 71.02 -70.88 -4.44 0.32 5970726.73 270184.91 N 70 19 17.900 W 147 51 48.451 1404.60 4.65 182.12 1353.53 1401.58 -25.50 74.75 72.15 -72.01 -4.48 0.19 5970725.60 270184.83 N 70 19 17.889 W 147 51 48.452 1418.55 4.63 182.13 1367.44 1415.49 -25.93 75.88 73.28 -73.14 -4.52 0.14 5970724.48 270184.75 N 70 19 17.878 W 147 51 48.453 1432.45 4.62 182.10 1381.29 1429.34 -26.35 77.00 74.40 -74.26 -4.56 0.07 5970723.36 270184.67 N 70 19 17.867 W 147 51 48.455 1446.25 4.62 182.00 1395.05 1443.10 -26.77 78.12 75.51 -75.37 -4.60 0.06 5970722.25 270184.60 N 70 19 17.856 W 147 51 48.456 SurveyEditor Ver SP 2.1 Bld( users) 4- 04\ 4- 04/T- 26 \4- 04A/T- 30 \4- 04A/T -30 Generated 5/19/2009 12:27 PM Page 3 of 11 Measured Azimuth Vertical Along Hole NS EW Comments Depth Inclination True Sub -Sea TVD ND Section Departure Closure True North True North DLS Northing Easting Latitude Longitude (ft ) (deg) (deg) (ft ) (ft) (ft) _ (ft) (ft) (ft ) (ft) (deg/100ft ) (ftUS) (ftUS) 1460.10 4.60 181.98 1408.85 1456.90 -27.19 79.23 76.62 -76.48 -4.64 0.14 5970721.14 270184.53 N 70 19 17.845 W 147 51 48.457 1474.00 4.58 181.85 1422.71 1470.76 -27.61 80.34 77.74 -77.59 -4.68 0.16 5970720.03 270184.46 N 70 19 17.834 W 147 51 48.458 1488.00 4.57 181.71 1436.66 1484.71 -28.04 81.46 78.85 -78.71 -4.72 0.11 5970718.91 270184.39 N 70 19 17.823 W 147 51 48.459 1501.90 4.52 181.61 1450.52 1498.57 -28.46 82.56 79.95 -79.81 -4.75 0.36 5970717.81 270184.32 N 70 19 17.813 W 147 51 48.460 1515.90 4.47 181.43 1464.48 1512.53 -28.89 83.66 81.05 -80.91 -4.78 0.37 5970716.72 270184.26 N 70 19 17.802 W 147 51 48.461 1529.85 4.35 181.07 1478.39 1526.44 -29.31 84.73 82.12 -81.98 -4.80 0.88 5970715.65 270184.20 N 70 19 17.791 W 147 51 48.461 1543.85 4.23 180.43 1492.35 1540.40 -29.73 85.78 83.17 -83.03 -4.81 0.92 5970714.60 270184.16 N 70 19 17.781 W 147 51 48.462 1557.80 4.15 180.30 1506.26 1554.31 -30.14 86.80 84.19 -84.05 -4.82 0.58 5970713.58 270184.12 N 70 19 17.771 W 147 51 48.462 1571.75 3.98 180.75 1520.18 1568.23 -30.54 87.78 85.17 -85.04 -4.83 1.24 5970712.60 270184.08 N 70 19 17.761 W 147 51 48.462 1585.75 3.80 181.35 1534.14 1582.19 -30.91 88.73 86.12 -85.99 -4.85 1.32 5970711.65 270184.03 N 70 19 17.752 W 147 51 48.463 1599.65 3.67 182.22 1548.01 1596.06 -31.26 89.64 87.03 -86.89 -4.87 1.02 5970710.74 270183.98 N 70 19 17.743 W 147 51 48. 1613.60 3.45 182.79 1561.94 1609.99 -31.58 90.51 87.89 -87.76 -4.91 1.60 5970709.88 270183.91 N 70 19 17.734 W 147 51 48 1627.55 3.27 183.17 1575.86 1623.91 -31.88 91.32 88.71 -88.57 -4.95 1.30 5970709.06 270183.85 N 70 19 17.726 W 147 51 48. 1641.50 3.15 183.81 1589.79 1637.84 -32.15 92.10 89.49 -89.35 -5.00 0.90 5970708.29 270183.77 N 70 19 17.719 W 147 51 48.467 1655.50 3.02 184.52 1603.77 1651.82 -32.41 92.86 90.25 -90.10 -5.06 0.97 5970707.54 270183.70 N 70 19 17.711 W 147 51 48.469 1669.40 2.90 185.35 1617.65 1665.70 -32.65 93.58 90.96 -90.82 -5.12 0.92 5970706.82 270183.61 N 70 19 17.704 W 147 51 48.471 1683.40 2.73 186.39 1631.63 1679.68 -32.87 94.26 91.65 -91.50 -5.19 1.27 5970706.14 270183.52 N 70 19 17.698 W 147 51 48.473 1697.40 2.55 187.68 1645.62 1693.67 -33.06 94.91 92.29 -92.14 -5.27 1.35 5970705.51 270183.42 N 70 19 17.691 W 147 51 48.475 1711.40 2.43 189.06 1659.61 1707.66 -33.22 95.52 92.90 -92.74 -5.36 0.96 5970704.91 270183.32 N 70 19 17.685 W 147 51 48.478 1725.35 2.30 190.12 1673.54 1721.59 -33.37 96.09 93.47 -93.31 -5.45 0.98 5970704.34 270183.20 N 70 19 17.680 W 147 51 48.480 1739.30 2.13 190.72 1687.48 1735.53 -33.50 96.63 94.01 -93.84 -5.55 1.23 5970703.82 270183.09 N 70 19 17.675 W 147 51 48.483 1753.30 2.03 191.13 1701.48 1749.53 -33.62 97.14 94.51 -94.34 -5.64 0.72 5970703.32 270182.98 N 70 19 17.670 W 147 51 48.486 1767.25 1.93 191.54 1715.42 1763.47 -33.72 97.62 94.99 -94.81 -5.74 0.72 5970702.85 270182.87 N 70 19 17.665 W 147 51 48.489 1781.25 1.83 191.12 1729.41 1777.46 -33.83 98.08 95.44 -95.26 -5.83 0.72 5970702.40 270182.77 N 70 19 17.661 W 147 51 48.492 1795.25 1.80 190.33 1743.40 1791.45 -33.93 98.52 95.88 -95.70 -5.91 0.28 5970701.97 270182.67 N 70 19 17.656 W 147 51 48.494 1809.25 1.78 190.13 1757.40 1805.45 -34.04 98.96 96.32 -96.13 -5.99 0.15 5970701.54 270182.58 N 70 19 17.652 W 147 51 48.496 1823.25 1.75 189.81 1771.39 1819.44 -34.14 99.39 96.75 -96.55 -6.06 0.23 5970701.12 270182.49 N 70 19 17.648 W 147 51 48.498 1837.25 1.70 189.38 1785.38 1833.43 -34.25 99.81 97.16 -96.97 -6.13 0.37 5970700.71 270182.41 N 70 19 17.644 W 147 51 48.500 1851.25 1.63 189.30 1799.38 1847.43 -34.35 100.22 97.57 -97.37 -6.20 0.50 5970700.31 270182.33 N 70 19 17.640 W 147 51 48.502 1865.20 1.57 189.16 1813.32 1861.37 -34.46 100.61 97.96 -97.76 -6.26 0.43 5970699.93 270182.26 N 70 19 17.636 W 147 51 480 1879.05 1.52 189.07 1827.17 1875.22 -34.55 100.98 98.33 -98.12 -6.32 0.36 5970699.56 270182.19 N 70 19 17.632 W 147 51 48.506 1892.90 1.45 189.20 1841.01 1889.06 -34.65 101.34 98.69 -98.48 -6.38 0.51 5970699.21 270182.12 N 70 19 17.629 W 147 51 48.508 1906.80 1.38 189.01 1854.91 1902.96 -34.74 101.69 99.03 -98.82 -6.43 0.50 5970698.87 270182.05 N 70 19 17.626 W 147 51 48.509 1920.80 1.33 188.86 1868.90 1916.95 -34.82 102.02 99.36 -99.15 -6.49 0.36 5970698.54 270181.99 N 70 19 17.622 W 147 51 48.511 1934.80 1.25 188.74 1882.90 1930.95 -34.91 102.33 99.67 -99.46 -6.53 0.57 5970698.23 270181.93 N 70 19 17.619 W 147 51 48.512 1948.90 1.12 189.00 1897.00 1945.05 -34.99 102.62 99.96 -99.74 -6.58 0.92 5970697.95 270181.88 N 70 19 17.616 W 147 51 48.513 1962.90 0.97 189.32 1910.99 1959.04 -35.05 102.88 100.22 - 100.00 -6.62 1.07 5970697.70 270181.83 N 70 19 17.614 W 147 51 48.515 1976.95 0.90 189.09 1925.04 1973.09 -35.11 103.11 100.44 - 100.22 -6.66 0.50 5970697.47 270181.79 N 70 19 17.612 W 147 51 48.516 1990.95 0.92 188.58 1939.04 1987.09 -35.17 103.33 100.67 - 100.44 -6.69 0.15 5970697.25 270181.75 N 70 19 17.610 W 147 51 48.517 2005.00 0.93 188.09 1953.09 2001.14 -35.23 103.56 100.89 - 100.67 -6.72 0.09 5970697.03 270181.71 N 70 19 17.607 W 147 51 48.518 SurveyEditor Ver SP 2.1 Bld( users) 4- 04\ 4- 04/T- 26 \4- 04A/T- 30 \4- 04A/T -30 Generated 5/19/2009 12:27 PM Page 4 of 11 Measured Azimuth Vertical Along Hole NS EW Comments Depth Inclination True Sub -Sea TVD TVD Section Departure Closure True North True North DLS Northing Easting Latitude Longitude (ft) (deg) (deg) (ft ) (ft) (ft) (ft) (ft) (ft) (ft) _ (deglt00ft ) (ftUS) _ (ftUS) 2019.00 0.95 187.91 1967.09 2015.14 -35.30 103.79 101.12 - 100.89 -6.75 0.14 5970696.80 270181.67 N 70 19 17.605 W 147 51 48.519 2032.80 0.97 187.68 1980.89 2028.94 -35.36 104.02 101.35 - 101.12 -6.79 0.15 5970696.58 270181.63 N 7019 17.603 W 147 51 48.519 2046.65 1.00 187.25 1994.73 2042.78 -35.43 104.26 101.59 - 101.36 -6.82 0.22 5970696.34 270181.59 N 7019 17.601 W 147 51 48.520 2060.45 1.00 187.10 2008.53 2056.58 -35.50 104.50 101.83 - 101.60 -6.85 0.02 5970696.10 270181.56 N 70 19 17.598 W 147 51 48.521 2074.35 0.97 187.24 2022.43 2070.48 -35.57 104.74 102.07 - 101.84 -6.88 0.22 5970695.87 270181.52 N 70 19 17.596 W 147 51 48.522 2088.15 0.90 187.51 2036.23 2084.28 -35.64 104.96 102.29 - 102.06 -6.91 0.51 5970695.64 270181.48 N 70 19 17.594 W 147 51 48.523 2101.95 0.85 187.45 2050.03 2098.08 -35.70 105.17 102.50 - 102.27 -6.93 0.36 5970695.44 270181.45 N 70 19 17.592 W 147 51 48.524 2115.85 0.85 187.08 2063.92 2111.97 -35.76 105.38 102.71 - 102.47 -6.96 0.04 5970695.23 270181.42 N 70 19 17.590 W 147 51 48.525 2129.65 0.80 187.20 2077.72 2125.77 -35.82 105.58 102.91 - 102.67 -6.98 0.36 5970695.04 270181.39 N 70 19 17.588 W 147 51 48.525 2143.50 0.77 187.28 2091.57 2139.62 -35.87 105.77 103.10 - 102.86 -7.01 0.22 5970694.85 270181.36 N 70 19 17.586 W 147 51 48.526 2157.30 0.73 188.09 2105.37 2153.42 -35.92 105.95 103.28 - 103.04 -7.03 0.30 5970694.67 270181.33 N 70 19 17.584 W 147 51 48.527 2171.10 0.63 189.68 2119.17 2167.22 -35.97 106.11 103.44 - 103.20 -7.06 0.74 5970694.51 270181.30 N 70 19 17.583 W 147 51 48.5 2185.00 0.53 191.68 2133.07 2181.12 -36.00 106.25 103.58 - 103.34 -7.08 0.73 5970694.37 270181.27 N 70 19 17.581 W 147 51 48. 2198.80 0.45 194.09 2146.87 2194.92 -36.02 106.37 103.70 - 103.45 -7.11 0.60 5970694.26 270181.24 N 70 19 17.580 W 147 51 48. 2212.70 0.42 196.29 2160.77 2208.82 -36.04 106.48 103.80 - 103.55 -7.14 0.25 5970694.16 270181.21 N 70 19 17.579 W 147 51 48.530 2226.50 0.40 197.09 2174.57 2222.62 -36.05 106.57 103.90 - 103.65 -7.17 0.15 5970694.06 270181.17 N 70 19 17.578 W 147 51 48.531 2240.30 0.38 196.69 2188.37 2236.42 -36.07 106.67 103.99 - 103.74 -7.19 0.15 5970693.97 270181.14 N 70 19 17.577 W 147 51 48.531 2254.20 0.38 189.92 2202.27 2250.32 -36.08 106.76 104.08 - 103.83 -7.21 0.32 5970693.89 270181.12 N 70 19 17.576 W 147 51 48.532 2268.00 0.42 182.62 2216.07 2264.12 -36.11 106.86 104.17 - 103.92 -7.22 0.47 5970693.79 270181.11 N 70 19 17.575 W 147 51 48.532 2281.85 0.42 182.49 2229.92 2277.97 -36.15 106.96 104.28 - 104.03 -7.23 0.01 5970693.69 270181.10 N 70 19 17.574 W 147 51 48.532 2295.65 0.40 183.41 2243.72 2291.77 -36.19 107.06 104.37 - 104.12 -7.23 0.15 5970693.59 270181.09 N 70 19 17.573 W 147 51 48.533 2309.35 0.43 183.26 2257.42 2305.47 -36.22 107.16 104.47 - 104.22 -7.24 0.22 5970693.49 270181.08 N 70 19 17.572 W 147 51 48.533 2323.05 0.48 189.15 2271.11 2319.16 -36.26 107.26 104.58 - 104.33 -7.25 0.50 5970693.38 270181.07 N 70 19 17.571 W 147 51 48.533 2336.75 0.50 196.86 2284.81 2332.86 -36.28 107.38 104.70 - 104.44 -7.28 0.50 5970693.27 270181.04 N 7019 17.570 W 147 51 48.534 2350.60 0.48 198.22 2298.66 2346.71 -36.29 107.50 104.81 - 104.56 -7.31 0.17 5970693.16 270181.00 N 7019 17.569 W 147 51 48.535 2364.40 0.47 197.31 2312.46 2360.51 -36.31 107.61 104.92 - 104.67 -7.35 0.09 5970693.05 270180.96 N 70 19 17.568 W 147 51 48.536 2378.20 0.47 196.29 2326.26 2374.31 -36.32 107.73 105.03 - 104.78 -7.38 0.06 5970692.94 270180.92 N 70 19 17.567 W 147 51 48.537 2392.00 0.45 196.06 2340.06 2388.11 -36.34 107.84 105.14 - 104.88 -7.41 0.15 5970692.84 270180.89 N 70 19 17.566 W 147 51 48.538 2405.85 0.45 194.24 2353.91 2401.96 -36.35 107.95 105.25 - 104.99 -7.44 0.10 5970692.73 270180.86 N 70 19 17.565 W 147 51 48.539 2419.65 0.43 190.19 2367.71 2415.76 -36.38 108.05 105.35 - 105.09 -7.46 0.27 5970692.63 270180.83 N 70 19 17.564 W 147 51 48.539 2433.55 0.43 185.11 2381.61 2429.66 -36.41 108.16 105.46 - 105.19 -7.48 0.27 5970692.53 270180.82 N 70 19 17.563 W 147 51 48.10 2447.35 0.43 181.91 2395.41 2443.46 -36.44 108.26 105.56 - 105.30 -7.48 0.17 5970692.43 270180.81 N 70 19 17.562 W 147 51 48.540 2461.15 0.43 180.69 2409.21 2457.26 -36.48 108.36 105.67 - 105.40 -7.49 0.07 5970692.32 270180.80 N 70 19 17.561 W 147 51 48.540 2475.05 0.40 182.58 2423.11 2471.16 -36.52 108.46 105.77 - 105.50 -7.49 0.24 5970692.22 270180.80 N 70 19 17.560 W 147 51 48.540 2488.85 0.37 185.89 2436.91 2484.96 -36.55 108.56 105.86 - 105.59 -7.49 0.27 5970692.13 270180.79 N 70 19 17.559 W 147 51 48.540 2502.70 0.35 184.94 2450.76 2498.81 -36.58 108.64 105.95 - 105.68 -7.50 0.15 5970692.04 270180.77 N 70 19 17.558 W 147 51 48.540 2516.60 0.33 184.18 2464.66 2512.71 -36.61 108.73 106.03 - 105.76 -7.51 0.15 5970691.96 270180.77 N 70 19 17.557 W 147 51 48.541 2530.40 0.35 187.75 2478.46 2526.51 -36.63 108.81 106.11 - 105.84 -7.52 0.21 5970691.88 270180.75 N 70 19 17.557 W 147 51 48.541 2544.30 0.38 189.87 2492.36 2540.41 -36.66 108.90 106.20 - 105.93 -7.53 0.24 5970691.79 270180.74 N 70 19 17.556 W 147 51 48.541 2558.10 0.43 189.69 2506.16 2554.21 -36.68 109.00 106.30 - 106.03 -7.55 0.36 5970691.70 270180.72 N 70 19 17.555 W 147 51 48.542 2571.95 0.43 202.36 2520.01 2568.06 -36.70 109.10 106.40 - 106.13 -7.58 0.69 5970691.60 270180.69 N 70 19 17.554 W 147 51 48.543 SurveyEditor Ver SP 2.1 Bld( users) 4- 04\ 4- 04/T- 26 \4- 04A/T- 30 \4- 04A/T -30 Generated 5/19/2009 12:27 PM Page 5 of 11 • Measured Azimuth Vertical Along Hole NS EW Comments Depth Inclination True Sub -Sea TVD TVD Section Departure Closure True North True North DLS Northing Easting Latitude Longitude (ft) _ (deg) _ (deg) (ft) (ft ) (ft) (ft) (ft) (ft ) (ft ) (deg/100ft ) (ftUS) (ftUS) 2585.80 0.50 230.46 2533.86 2581.91 -36.67 109.21 106.49 - 106.21 -7.64 1.70 5970691.52 270180.62 N 70 19 17.553 W 147 51 48.544 2599.70 0.72 254.17 2547.76 2595.81 -36.58 109.35 106.56 - 106.28 -7.77 2.38 5970691.46 270180.49 N 70 19 17.552 W 147 51 48.548 2613.50 1.03 267.27 2561.55 2609.60 -36.40 109.56 106.60 - 106.30 -7.98 2.66 5970691.43 270180.28 N 7019 17.552 W 147 51 48.554 2627.40 1.43 276.81 2575.45 2623.50 -36.12 109.86 106.61 - 106.29 -8.28 3.22 5970691.46 270179.98 N 70 19 17.552 W 147 51 48.563 2641.20 1.87 284.37 2589.25 2637.30 -35.74 110.26 106.57 - 106.21 -8.67 3.55 5970691.55 270179.59 N 70 19 17.553 W 147 51 48.574 2655.00 2.38 290.66 2603.04 2651.09 -35.23 110.77 106.45 - 106.06 -9.15 4.06 5970691.72 270179.11 N 70 19 17.554 W 147 51 48.589 2668.90 2.90 296.60 2616.92 2664.97 -34.59 111.41 106.24 - 105.80 -9.74 4.22 5970691.99 270178.54 N 70 19 17.557 W 147 51 48.606 2682.80 3.40 300.74 2630.80 2678.85 -33.83 112.17 105.94 - 105.43 -10.41 3.95 5970692.38 270177.88 N 70 19 17.561 W 147 51 48.625 2696.65 3.80 303.42 2644.62 2692.67 -32.97 113.04 105.56 - 104.97 -11.14 3.13 5970692.87 270177.16 N 70 19 17.565 W 147 51 48.647 2710.50 4.15 303.71 2658.44 2706.49 -32.02 114.00 105.12 - 104.44 -11.94 2.53 5970693.42 270176.38 N 70 19 17.570 W 147 51 48.670 2724.35 4.43 301.08 2672.25 2720.30 -31.00 115.04 104.67 - 103.88 -12.82 2.47 5970694.00 270175.52 N 70 19 17.576 W 147 51 48.695 2738.15 4.77 299.69 2686.01 2734.06 -29.90 116.15 104.24 - 103.32 -13.77 2.59 5970694.59 270174.58 N 70 19 17.581 W 147 51 48.7 2751.90 5.18 299.53 2699.70 2747.75 -28.71 117.34 103.80 - 102.73 -14.81 2.98 5970695.21 270173.56 N 70 19 17.587 W 147 51 48. 2765.65 5.55 299.55 2713.39 2761.44 -27.43 118.62 103.33 - 102.10 -15.93 2.69 5970695.88 270172.46 N 70 19 17.593 W 147 51 48. 2779.45 5.83 299.41 2727.13 2775.18 -26.07 119.99 102.86 - 101.43 -17.12 2.03 5970696.59 270171.29 N 70 19 17.600 W 147 51 48.821 2793.35 6.10 300.94 2740.95 2789.00 -24.63 121.44 102.36 - 100.70 -18.37 2.25 5970697.35 270170.07 N 70 19 17.607 W 147 51 48.857 2807.25 6.37 304.26 2754.77 2802.82 -23.14 122.95 101.80 -99.89 -19.64 3.24 5970698.21 270168.82 N 70 19 17.615 W 147 51 48.895 2821.15 6.63 307.31 2768.58 2816.63 -21.60 124.52 101.15 -98.97 -20.91 3.11 5970699.17 270167.58 N 70 19 17.624 W 147 51 48.932 2834.95 7.02 309.17 2782.28 2830.33 -20.00 126.16 100.43 -97.95 -22.20 3.25 5970700.22 270166.32 N 70 19 17.634 W 147 51 48.969 2848.60 7.33 309.53 2795.83 2843.88 -18.36 127.86 99.68 -96.87 -23.52 2.29 5970701.34 270165.04 N 70 19 17.645 W 147 51 49.008 2862.30 7.47 310.33 2809.41 2857.46 -16.66 129.63 98.91 -95.74 -24.87 1.27 5970702.51 270163.72 N 70 19 17.656 W 147 51 49.047 2876.00 7.60 312.16 2822.99 2871.04 -14.94 131.42 98.12 -94.55 -26.22 1.99 5970703.74 270162.41 N 70 19 17.668 W 147 51 49.087 2889.65 7.92 314.67 2836.52 2884.57 -13.20 133.27 97.27 -93.28 -27.56 3.41 5970705.05 270161.11 N 70 19 17.680 W 147 51 49.126 2903.35 8.32 317.47 2850.08 2898.13 -11.41 135.20 96.33 -91.89 -28.90 4.11 5970706.48 270159.81 N 70 19 17.694 W 147 51 49.165 2917.10 8.70 319.35 2863.68 2911.73 -9.55 137.24 95.30 -90.37 -30.25 3.42 5970708.04 270158.51 N 7019 17.709 W 147 51 49.204 2930.70 9.05 320.45 2877.12 2925.17 -7.66 139.33 94.22 -88.76 -31.60 2.86 5970709.69 270157.21 N 70 19 17.724 W 147 51 49.244 2944.40 9.38 321.98 2890.64 2938.69 -5.70 141.53 93.09 -87.05 -32.98 3.00 5970711.44 270155.88 N 70 19 17.741 W 147 51 49.284 2958.10 9.70 323.79 2904.15 2952.20 -3.71 143.80 91.90 -85.24 -34.35 3.20 5970713.29 270154.57 N 70 19 17.759 W 147 51 49.324 2971.70 9.97 324.56 2917.55 2965.60 -1.70 146.12 90.68 -83.36 -35.71 2.21 5970715.22 270153.27 N 70 19 17.778 W 147 51 49.363 2985.40 10.20 323.29 2931.04 2979.09 0.39 148.52 89.48 -81.42 -37.12 2.34 5970717.20 270151.92 N 70 19 17.797 W 147 51 49. 2999.10 10.48 321.12 2944.52 2992.57 2.56 150.98 88.37 -79.48 -38.63 3.50 5970719.19 270150.47 N 70 19 17.816 W 147 51 49. 3012.70 10.83 320.00 2957.88 3005.93 4.81 153.49 87.35 -77.54 -40.22 2.99 5970721.18 270148.93 N 70 19 17.835 W 147 51 49.495 3026.40 11.20 319.78 2971.33 3019.38 7.17 156.11 86.38 -75.53 -41.91 2.72 5970723.23 270147.31 N 70 19 17.855 W 147 51 49.544 3040.00 11.50 319.55 2984.66 3032.71 9.59 158.79 85.48 -73.49 -43.64 2.23 5970725.32 270145.64 N 70 19 17.875 W 147 51 49.595 3053.65 11.90 319.20 2998.03 3046.08 12.10 161.56 84.63 -71.39 -45.44 2.98 5970727.47 270143.90 N 70 19 17.895 W 147 51 49.648 3067.30 12.25 318.94 3011.38 3059.43 14.69 164.41 83.86 -69.24 -47.32 2.59 5970729.69 270142.10 N 70 19 17.917 W 147 51 49.702 3080.95 12.50 318.53 3024.71 3072.76 17.35 167.34 83.18 -67.04 -49.25 1.94 5970731.94 270140.24 N 70 19 17.938 W 147 51 49.759 3094.60 12.85 318.05 3038.03 3086.08 20.09 170.33 82.61 -64.80 -51.24 2.68 5970734.24 270138.31 N 70 19 17.960 W 147 51 49.817 3108.25 13.25 318.11 3051.32 3099.37 22.91 173.41 82.15 -62.51 -53.30 2.93 5970736.60 270136.33 N 70 19 17.983 W 147 51 49.877 3121.85 13.73 318.77 3064.55 3112.60 25.80 176.59 81.76 -60.13 -55.40 3.71 5970739.03 270134.30 N 70 19 18.006 W 147 51 49.938 3135.45 14.18 319.21 3077.75 3125.80 28.78 179.87 81.47 -57.66 -57.55 3.40 5970741.57 270132.22 N 70 19 18.030 W 147 51 50.001 SurveyEditor Ver SP 2.1 Bld( users) 4- 04\ 4- 04/T- 26 \4- 04A/T- 30 \4- 04A/T -30 Generated 5/19/2009 12:27 PM Page 6 of 11 Measured Azimuth Vertical Along Hole NS EW Comments Depth Inclination True Sub -Sea TVD TVD Section Departure Closure True North True North DLS Northing Easting Latitude Longitude (ft) (deg) (deg) (ft ) (ft ) (ft) (ft) _ ((t) (ft ) (ft) (deg/100ft) (ftUS) (ftUS) 3149.10 14.60 319.17 3090.97 3139.02 31.86 183.26 81.29 -55.09 -59.77 3.08 5970744.21 270130.08 N 70 19 18.056 W 147 51 50.066 3162.70 15.17 319.12 3104.11 3152.16 35.03 186.75 81.25 -52.45 -62.06 4.19 5970746.92 270127.88 N 70 19 18.082 W 147 51 50.132 3178.10 15.87 319.13 3118.95 3167.00 38.76 190.87 81.40 -49.33 -64.75 4.55 5970750.11 270125.28 N 70 19 18.112 W 147 51 50.211 3218.65 17.22 318.67 3157.82 3205.87 49.26 202.42 82.97 -40.63 -72.34 3.34 5970759.04 270117.96 N 70 19 18.198 W 147 51 50.433 3261.35 18.33 317.46 3198.48 3246.53 61.19 215.45 86.76 -30.94 -81.06 2.74 5970769.00 270109.55 N 70 19 18.293 W 147 51 50.687 3304.00 19.18 314.62 3238.87 3286.92 73.92 229.16 93.00 -21.08 -90.58 2.92 5970779.15 270100.33 N 70 19 18.390 W 147 51 50.965 3346.80 19.33 310.35 3279.28 3327.33 87.32 243.27 101.64 -11.55 - 100.98 3.31 5970788.99 270090.22 N 70 19 18.484 W 147 51 51.268 3389.60 19.05 306.28 3319.70 3367.75 100.96 257.34 112.05 -2.83 - 112.01 3.19 5970798.04 270079.47 N 70 19 18.570 W 147 51 51.590 3432.40 19.18 303.04 3360.14 3408.19 114.74 271.35 123.64 5.14 - 123.54 2.50 5970806.36 270068.19 N 7019 18.648 W 147 51 51.927 3475.15 19.80 300.35 3400.44 3448.49 128.88 285.61 136.26 12.62 - 135.67 2.55 5970814.21 270056.29 N 70 19 18.722 W 147 51 52.281 3517.95 20.57 297.80 3440.61 3488.66 143.59 300.38 149.89 19.79 - 148.58 2.73 5970821.77 270043.61 N 70 19 18.792 W 147 51 52.658 3560.75 21.53 296.26 3480.56 3528.61 158.95 315.75 164.47 26.77 - 162.27 2.59 5970829.17 270030.14 N 70 19 18.861 W 147 51 53.0 3603.55 22.55 295.52 3520.23 3568.28 175.00 331.81 179.92 33.78 - 176.72 2.47 5970836.62 270015.91 N 70 19 18.930 W 147 51 53. 3646.10 23.48 294.69 3559.39 3607.44 191.63 348.44 196.09 40.84 - 191.79 2.31 5970844.13 270001.07 N 70 19 18.999 W 147 51 53.919 3688.20 24.33 293.79 3597.88 3645.93 208.69 365.50 212.79 47.84 - 207.35 2.20 5970851.61 269985.74 N 70 19 19.068 W 147 51 54.373 3730.40 25.12 293.11 3636.21 3684.26 226.34 383.15 230.17 54.86 - 223.54 1.99 5970859.12 269969.77 N 70 19 19.137 W 147 51 54.845 3772.50 25.87 292.04 3674.21 3722.26 244.45 401.27 248.10 61.82 - 240.27 2.09 5970866.58 269953.25 N 70 19 19.205 W 147 51 55.334 3814.60 26.60 290.44 3711.98 3760.03 263.04 419.88 266.58 68.56 - 257.62 2.41 5970873.85 269936.12 N 70 19 19.272 W 147 51 55.840 3856.70 27.20 288.79 3749.52 3797.57 282.02 438.93 285.57 74.95 - 275.56 2.27 5970880.79 269918.39 N 70 19 19.335 W 147 51 56.363 3898.70 27.45 286.52 3786.84 3834.89 301.17 458.21 304.83 80.79 - 293.93 2.55 5970887.19 269900.21 N 70 19 19.392 W 147 51 56.899 3940.85 27.72 284.26 3824.20 3872.25 320.45 477.72 324.34 85.97 - 312.74 2.56 5970892.94 269881.56 N 70 19 19.443 W 147 51 57.449 3982.95 28.48 283.18 3861.33 3909.38 339.94 497.55 344.16 90.67 - 332.01 2.17 5970898.23 269862.45 N 70 19 19.489 W 147 51 58.011 4025.00 29.68 282.88 3898.08 3946.13 359.99 517.99 364.59 95.28 - 351.92 2.87 5970903.44 269842.69 N 7019 19.534 W 147 51 58.592 4067.20 30.98 282.76 3934.51 3982.56 380.87 539.30 385.88 100.01 - 372.70 3.08 5970908.81 269822.07 N 70 19 19.581 W 147 51 59.198 4109.35 32.30 282.76 3970.39 4018.44 402.54 561.41 407.97 104.89 - 394.26 3.13 5970914.35 269800.66 N 70 19 19.629 W 147 51 59.828 4151.55 33.62 282.85 4005.80 4053.85 425.04 584.37 430.92 109.98 - 416.65 3.13 5970920.12 269778.44 N 70 19 19.679 W 147 52 0.481 4193.75 34.93 282.99 4040.67 4088.72 448.34 608.13 454.67 115.29 - 439.81 3.11 5970926.14 269755.45 N 70 19 19.731 W 147 52 1.157 4235.95 36.27 283.15 4074.98 4123.03 472.44 632.70 479.23 120.85 - 463.74 3.18 5970932.43 269731.71 N 70 19 19.786 W 147 52 1.855 4278.25 37.63 283.37 4108.78 4156.83 497.40 658.12 504.65 126.68 - 488.49 3.23 5970939.01 269707.15 N 70 19 19.843 W 147 52 2.578 4320.50 38.98 283.65 4141.94 4189.99 523.13 684.31 530.83 132.80 - 513.95 3.22 5970945.91 269681.89 N 70 19 19.903 W 147 52 3. 4362.90 40.30 283.93 4174.59 4222.64 549.73 711.36 557.88 139.25 - 540.22 3.14 5970953.16 269655.83 N 70 19 19.967 W 147 52 4. 4405.25 41.53 284.26 4206.59 4254.64 577.03 739.10 585.61 146.00 - 567.12 2.95 5970960.73 269629.15 N 70 19 20.033 W 147 52 4.873 4447.15 42.80 284.52 4237.65 4285.70 604.74 767.22 613.74 152.99 - 594.36 3.06 5970968.55 269602.13 N 70 19 20.102 W 147 52 5.668 4488.65 44.18 284.71 4267.75 4315.80 632.89 795.78 642.30 160.20 - 622.00 3.34 5970976.60 269574.73 N 70 19 20.173 W 147 52 6.474 4529.90 45.55 284.87 4296.99 4345.04 661.60 824.88 671.40 167.63 - 650.13 3.33 5970984.89 269546.84 N 70 19 20.246 W 147 52 7.295 4571.10 46.92 285.00 4325.49 4373.54 690.96 854.64 701.15 175.30 - 678.88 3.33 5970993.44 269518.34 N 70 19 20.321 W 147 52 8.134 4612.55 48.38 285.18 4353.41 4401.46 721.20 885.27 731.78 183.27 - 708.46 3.54 5971002.31 269489.02 N 70 19 20.400 W 147 52 8.998 4654.10 49.77 285.38 4380.63 4428.68 752.21 916.66 763.17 191.55 - 738.74 3.37 5971011.51 269459.01 N 70 19 20.481 W 147 52 9.881 4695.60 50.83 285.51 4407.14 4455.19 783.76 948.59 795.10 200.05 - 769.52 2.57 5971020.95 269428.51 N 70 19 20.565 W 147 52 10.780 4737.10 51.72 285.63 4433.10 4481.15 815.76 980.97 827.47 208.74 - 800.71 2.16 5971030.59 269397.60 N 70 19 20.650 W 147 52 11.690 4778.50 52.32 285.79 4458.57 4506.62 848.03 1013.60 860.10 217.58 - 832.12 1.48 5971040.38 269366.48 N 70 19 20.737 W 147 52 12.607 SurveyEditor Ver SP 2.1 Bid( users) 4- 04\ 4- 04/T- 26 \4- 04A/T- 30 \4- 04A/T -30 Generated 5/19/2009 12:27 PM Page 7 of 11 Measured Azimuth Vertical Along Hole NS EW Comments Depth Inclination True Sub -Sea TVD TVD Section Departure Closure True North True North DLS Northing Easting Latitude Longitude (ft) (deg) (deg) (ft) (ft ) (ft) (ft) (ft) (ft) (ft) (deg/100ft) (ftUS) (ftUS) 4820.00 52.35 285.96 4483.93 4531.98 880.53 1046.45 892.94 226.56 - 863.72 0.33 5971050.33 269335.17 N 70 19 20.825 W 147 52 13.529 4861.50 52.30 286.08 4509.30 4557.35 913.04 1079.30 925.78 235.63 - 895.29 0.26 5971060.36 269303.89 N 70 19 20.914 W 147 52 14.450 4903.05 52.15 286.12 4534.75 4582.80 945.55 1112.14 958.61 244.74 - 926.84 0.37 5971070.43 269272.63 N 70 19 21.004 W 147 52 15.371 4944.60 51.92 286.15 4560.31 4608.36 977.98 1144.90 991.36 253.84 - 958.31 0.56 5971080.49 269241.46 N 7019 21.093 W 147 52 16.290 4986.25 51.85 286.22 4586.02 4634.07 1010.42 1177.67 1024.12 262.97 - 989.78 0.21 5971090.58 269210.29 N 70 19 21.183 W 147 52 17.208 5027.85 51.57 286.36 4611.79 4659.84 1042.76 1210.32 1056.76 272.13 - 1021.12 0.72 5971100.70 269179.24 N 70 19 21.273 W 147 52 18.123 5069.50 51.25 286.52 4637.77 4685.82 1075.01 1242.87 1089.31 281.34 - 1052.35 0.82 5971110.86 269148.32 N 70 19 21.364 W 147 52 19.034 5111.15 51.03 286.60 4663.90 4711.95 1107.15 1275.30 1121.72 290.59 - 1083.43 0.55 5971121.05 269117.53 N 70 19 21.455 W 147 52 19.941 5152.65 50.75 286.65 4690.08 4738.13 1139.07 1307.51 1153.91 299.80 - 1114.29 0.68 5971131.21 269086.97 N 70 19 21.545 W 147 52 20.842 5194.35 50.43 286.71 4716.56 4764.61 1171.00 1339.72 1186.12 309.05 - 1145.15 0.78 5971141.39 269056.41 N 70 19 21.636 W 147 52 21.743 5235.45 50.17 286.77 4742.81 4790.86 1202.35 1371.35 1217.73 318.16 - 1175.43 0.64 5971151.42 269026.42 N 70 19 21.726 W 147 52 22.627 5276.45 49.98 286.84 4769.12 4817.17 1233.53 1402.79 1249.16 327.25 - 1205.53 0.48 5971161.43 268996.61 N 70 19 21.815 W 147 52 23.5 5317.35 49.72 286.86 4795.50 4843.55 1264.53 1434.05 1280.41 336.31 - 1235.45 0.64 5971171.41 268966.99 N 70 19 21.904 W 147 52 24. 5358.30 49.37 286.88 4822.07 4870.12 1295.43 1465.21 1311.56 345.35 - 1265.27 0.86 5971181.36 268937.46 N 70 19 21.993 W 147 52 25.249 5399.20 49.05 287.02 4848.79 4896.84 1326.15 1496.18 1342.51 354.38 - 1294.89 0.82 5971191.29 268908.13 N 70 19 22.082 W 147 52 26.113 5440.10 48.58 287.15 4875.72 4923.77 1356.69 1526.96 1373.27 363.42 - 1324.31 1.17 5971201.23 268879.00 N 70 19 22.171 W 147 52 26.972 5481.00 48.48 287.15 4902.80 4950.85 1387.10 1557.60 1403.91 372.46 - 1353.60 0.24 5971211.15 268850.01 N 70 19 22.259 W 147 52 27.827 5522.00 48.77 287.14 4929.90 4977.95 1417.63 1588.37 1434.66 381.53 - 1383.00 0.71 5971221.12 268820.90 N 70 19 22.349 W 147 52 28.685 5562.90 48.62 287.11 4956.90 5004.95 1448.11 1619.09 1465.37 390.58 - 1412.36 0.37 5971231.06 268791.83 N 70 19 22.437 W 147 52 29.542 5603.80 48.25 287.06 4984.04 5032.09 1478.47 1649.70 1495.96 399.57 - 1441.61 0.91 5971240.94 268762.87 N 70 19 22.526 W 147 52 30.396 5644.80 48.02 287.01 5011.40 5059.45 1508.77 1680.23 1526.48 408.51 - 1470.80 0.57 5971250.78 268733.97 N 70 19 22.614 W 147 52 31.248 5685.80 47.87 286.93 5038.86 5086.91 1538.96 1710.67 1556.91 417.40 - 1499.92 0.39 5971260.55 268705.14 N 7019 22.701 W 147 52 32.097 5726.90 47.77 286.89 5066.46 5114.51 1569.17 1741.13 1587.36 426.26 - 1529.06 0.25 5971270.30 268676.28 N 70 19 22.788 W 147 52 32.948 5767.90 47.62 286.88 5094.05 5142.10 1599.24 1771.45 1617.68 435.06 - 1558.08 0.37 5971279.99 268647.55 N 70 19 22.875 W 147 52 33.795 5808.80 47.47 286.87 5121.66 5169.71 1629.17 1801.63 1647.85 443.82 - 1586.95 0.37 5971289.63 268618.96 N 70 19 22.961 W 147 52 34.638 5849.50 47.25 286.83 5149.23 5197.28 1658.86 1831.57 1677.78 452.50 - 1615.61 0.55 5971299.18 268590.58 N 70 19 23.046 W 147 52 35.474 5890.20 47.05 286.77 5176.91 5224.96 1688.44 1861.41 1707.61 461.13 - 1644.17 0.50 5971308.67 268562.30 N 70 19 23.131 W 147 52 36.308 5931.15 46.93 286.74 5204.84 5252.89 1718.13 1891.35 1737.55 469.76 - 1672.84 0.30 5971318.18 268533.90 N 70 19 23.216 W 147 52 37.145 5972.30 47.05 286.78 5232.91 5280.96 1747.96 1921.44 1767.64 478.43 - 1701.66 0.30 5971327.73 268505.37 N 70 19 23.301 W 147 52 37.986 6012.80 47.42 286.86 5260.41 5308.46 1777.45 1951.17 1797.36 487.04 - 1730.12 0.93 5971337.20 268477.19 N 70 19 23.385 W 147 52 38.1111 6053.40 47.90 286.96 5287.76 5335.81 1807.21 1981.18 1827.37 495.77 - 1758.83 1.20 5971346.81 268448.76 N 70 19 23.471 W 147 52 39. 6093.90 48.25 287.12 5314.82 5362.87 1837.10 2011.31 1857.49 504.60 - 1787.64 0.91 5971356.51 268420.23 N 70 19 23.558 W 147 52 40.495 6134.45 48.60 287.29 5341.73 5389.78 1867.21 2041.65 1887.82 513.57 - 1816.62 0.92 5971366.37 268391.55 N 70 19 23.646 W 147 52 41.341 6175.65 48.93 287.43 5368.88 5416.93 1897.97 2072.63 1918.79 522.82 - 1846.19 0.84 5971376.52 268362.27 N 7019 23.737 W 147 52 42.204 6218.90 49.05 287.47 5397.27 5445.32 1930.37 2105.27 1951.41 532.60 - 1877.32 0.29 5971387.25 268331.45 N 70 19 23.833 W 147 52 43.113 6262.20 49.18 287.42 5425.61 5473.66 1962.88 2138.00 1984.13 542.42 - 1908.55 0.31 5971398.02 268300.54 N 70 19 23.930 W 147 52 44.025 6305.45 49.33 287.36 5453.84 5501.89 1995.41 2170.77 2016.89 552.21 - 1939.82 0.36 5971408.76 268269.59 N 70 19 24.026 W 147 52 44.937 6348.70 49.78 287.36 5481.89 5529.94 2028.08 2203.69 2049.79 562.03 - 1971.24 1.04 5971419.54 268238.49 N 70 19 24.122 W 147 52 45.854 6392.05 50.40 287.39 5509.71 5557.76 2061.10 2236.94 2083.04 571.96 - 2002.97 1.43 5971430.44 268207.07 N 70 19 24.220 W 147 52 46.781 6435.35 50.88 287.44 5537.17 5585.22 2094.34 2270.42 2116.50 581.98 - 2034.92 1.11 5971441.43 268175.45 N 70 19 24.318 W 147 52 47.713 6478.65 51.20 287.49 5564.39 5612.44 2127.77 2304.09 2150.16 592.08 - 2067.03 0.74 5971452.51 268143.66 N 70 19 24.418 W 147 52 48.650 SurveyEditor Ver SP 2.1 Bld( users) 4- 04\ 4- 04/T- 26 \4- 04A/T- 30 \4- 04A/T -30 Generated 5/19/2009 12:27 PM Page 8 of 11 Measured Azimuth Vertical Along Hole NS EW Comments Depth Inclination True Sub -Sea TVD TVD Section Departure Closure True North True North DLS Northing Easting Latitude Longitude (ft ) (deg) (deg) (ft) (ft) (ft) (ft) _ (ft) (ft ) _ (ft ) (deg/100ft ) (ftUS) (ftUS) 6522.05 51.57 287.52 5591.48 5639.53 2161.44 2338.00 2184.06 602.28 - 2099.37 0.85 5971463.70 268111.65 N 70 19 24.518 W 147 52 49.594 6565.45 52.08 287.54 5618.30 5666.35 2195.33 2372.11 2218.17 612.56 - 2131.91 1.18 5971474.96 268079.45 N 70 19 24.619 W 147 52 50.544 6608.75 52.50 287.57 5644.79 5692.84 2229.35 2406.37 2252.41 622.89 - 2164.57 0.97 5971486.29 268047.12 N 70 19 24.720 W 147 52 51.497 6652.15 52.92 287.57 5671.08 5719.13 2263.64 2440.90 2286.92 633.32 - 2197.48 0.97 5971497.72 268014.54 N 70 19 24.823 W 147 52 52.458 6695.55 53.23 287.52 5697.15 5745.20 2298.10 2475.59 2321.61 643.78 - 2230.57 0.72 5971509.18 267981.80 N 70 19 24.926 W 147 52 53.424 6738.65 53.60 287.45 5722.84 5770.89 2332.46 2510.20 2356.21 654.17 - 2263.57 0.87 5971520.59 267949.12 N 70 19 25.028 W 147 52 54.387 6781.30 54.00 287.39 5748.03 5796.08 2366.64 2544.62 2390.62 664.48 - 2296.41 0.94 5971531.89 267916.62 N 70 19 25.129 W 147 52 55.346 6824.05 54.17 287.32 5773.11 5821.16 2401.01 2579.24 2425.23 674.80 - 2329.46 0.42 5971543.22 267883.90 N 70 19 25.231 W 147 52 56.310 6866.85 54.15 287.29 5798.17 5846.22 2435.45 2613.94 2459.92 685.12 - 2362.58 0.07 5971554.55 267851.11 N 70 19 25.332 W 147 52 57.277 6909.65 54.43 287.34 5823.15 5871.20 2469.95 2648.69 2494.66 695.47 - 2395.76 0.66 5971565.91 267818.27 N 70 19 25.434 W 147 52 58.246 6952.45 54.77 287.41 5847.94 5895.99 2504.58 2683.58 2529.55 705.89 - 2429.06 0.81 5971577.34 267785.31 N 70 19 25.536 W 147 52 59.218 6995.25 54.95 287.45 5872.58 5920.63 2539.33 2718.58 2564.54 716.37 - 2462.45 0.43 5971588.84 267752.25 N 70 19 25.639 W 147 53 0. 7038.10 55.12 287.43 5897.13 5945.18 2574.20 2753.69 2599.64 726.89 - 2495.95 0.40 5971600.39 267719.09 N 70 19 25.742 W 147 53 1. 7080.95 55.08 287.31 5921.65 5969.70 2609.09 2788.84 2634.78 737.39 - 2529.49 0.25 5971611.90 267685.89 N 70 19 25.845 W 147 53 2.149 7123.70 55.23 287.20 5946.08 5994.13 2643.91 2823.92 2669.86 747.79 - 2563.00 0.41 5971623.33 267652.72 N 70 19 25.948 W 147 53 3.127 7166.35 55.58 287.12 5970.29 6018.34 2678.75 2859.03 2704.97 758.15 - 2596.54 0.84 5971634.71 267619.51 N 70 19 26.049 W 147 53 4.106 7208.95 55.70 287.03 5994.33 6042.38 2713.64 2894.20 2740.13 768.48 - 2630.16 0.33 5971646.06 267586.22 N 70 19 26.151 W 147 53 5.088 7251.50 55.63 286.96 6018.33 6066.38 2748.50 2929.33 2775.26 778.75 - 2663.76 0.21 5971657.35 267552.95 N 70 19 26.252 W 147 53 6.069 7294.35 55.63 286.92 6042.52 6090.57 2783.58 2964.70 2810.63 789.05 - 2697.60 0.08 5971668.69 267519.45 N 70 19 26.353 W 147 53 7.056 7337.45 55.53 286.85 6066.89 6114.94 2818.84 3000.25 2846.18 799.38 - 2731.62 0.27 5971680.05 267485.76 N 70 19 26.454 W 147 53 8.049 7380.55 55.40 286.76 6091.32 6139.37 2854.04 3035.76 2881.68 809.64 - 2765.61 0.35 5971691.35 267452.11 N 70 19 26.555 W 147 53 9.041 7423.75 55.67 286.70 6115.77 6163.82 2889.35 3071.38 2917.30 819.90 - 2799.72 0.64 5971702.64 267418.33 N 70 19 26.656 W 147 53 10.037 7466.85 55.98 286.68 6139.98 6188.03 2924.70 3107.03 2952.96 830.14 - 2833.87 0.72 5971713.92 267384.50 N 70 19 26.757 W 147 53 11.034 7509.30 55.98 286.65 6163.73 6211.78 2959.57 3142.22 2988.14 840.23 - 2867.58 0.06 5971725.04 267351.12 N 70 19 26.856 W 147 53 12.018 7551.80 56.12 286.58 6187.46 6235.51 2994.52 3177.47 3023.40 850.31 - 2901.36 0.36 5971736.15 267317.67 N 70 19 26.955 W 147 53 13.004 7594.20 56.13 286.48 6211.10 6259.15 3029.40 3212.68 3058.60 860.32 - 2935.11 0.20 5971747.19 267284.24 N 70 19 27.053 W 147 53 13.989 7636.65 56.10 286.43 6234.76 6282.81 3064.31 3247.92 3093.84 870.31 - 2968.91 0.12 5971758.21 267250.77 N 70 19 27.151 W 147 53 14.976 7679.05 55.95 286.42 6258.46 6306.51 3099.15 3283.08 3129.00 880.25 - 3002.63 0.35 5971769.18 267217.36 N 70 19 27.249 W 147 53 15.960 7721.40 55.75 286.46 6282.23 6330.28 3133.87 3318.13 3164.05 890.17 - 3036.25 0.48 5971780.12 267184.07 N 7019 27.346 W 147 53 16.942 7763.70 55.85 286.57 6306.01 6354.06 3168.53 3353.11 3199.03 900.11 - 3069.79 0.32 5971791.09 267150.85 N 70 19 27.444 W 147 53 17.0 7806.04 55.98 286.65 6329.73 6377.78 3203.29 3388.18 3234.10 910.14 - 3103.39 0.34 5971802.13 267117.57 N 70 19 27.542 W 147 53 18. 7848.40 56.00 286.66 6353.43 6401.48 3238.09 3423.29 3269.21 920.20 - 3137.03 0.05 5971813.22 267084.25 N 70 19 27.641 W 147 53 19.884 7890.70 56.07 286.66 6377.06 6425.11 3272.87 3458.37 3304.29 930.26 - 3170.64 0.17 5971824.30 267050.97 N 70 19 27.740 W 147 53 20.865 7933.05 56.22 286.60 6400.65 6448.70 3307.73 3493.54 3339.46 940.32 - 3204.34 0.37 5971835.40 267017.60 N 70 19 27.839 W 147 53 21.848 7975.45 56.32 286.48 6424.20 6472.25 3342.67 3528.81 3374.73 950.36 - 3238.15 0.33 5971846.46 266984.12 N 70 19 27.937 W 147 53 22.835 8017.90 56.37 286.45 6447.72 6495.77 3377.68 3564.14 3410.06 960.38 - 3272.03 0.13 5971857.51 266950.56 N 70 19 28.036 W 147 53 23.824 8060.30 56.30 286.48 6471.23 6519.28 3412.64 3599.43 3445.35 970.38 - 3305.87 0.18 5971868.55 266917.04 N 70 19 28.134 W 147 53 24.812 8102.70 56.40 286.54 6494.72 6542.77 3447.61 3634.73 3480.65 980.41 - 3339.71 0.26 5971 879.61 266883.52 N 70 19 28.232 W 147 53 25.800 8145.10 56.82 286.64 6518.06 6566.11 3482.70 3670.13 3516.05 990.52 - 3373.64 1.01 5971890.75 266849.92 N 70 19 28.332 W 147 53 26.791 8187.45 57.07 286.75 6541.15 6589.20 3517.88 3705.62 3551.54 1000.72 - 3407.64 0.63 5971901.98 266816.25 N 70 19 28.432 W 147 53 27.783 8229.10 57.22 286.84 6563.75 6611.80 3552.58 3740.61 3586.53 1010.82 - 3441.14 0.40 5971913.11 266783.08 N 70 19 28.531 W 147 53 28.761 SurveyEditor Ver SP 2.1 Bld( users) 4- 04\ 4- 04/T- 26 \4- 04A/T- 30 \4- 04A/T -30 Generated 5/19/2009 12:27 PM Page 9 of 11 • Measured Azimuth Vertical Along Hole NS EW Comments Depth Inclination True Sub -Sea TVD TVD Section Departure Closure True North True North DLS Northing Easting Latitude Longitude (ft) (deg) (deg) _ (ft) _ (ft) (ft) (ft) _ (ft) (ft) (ft) (deg/100ft) (ftUS) (ftUS) 8270.39 57.60 286.92 6585.99 6634.04 3587.08 3775.40 3621.32 1020.93 - 3474.43 0.93 5971924.23 266750.12 N 70 19 28.630 W 147 53 29.733 8311.70 57.97 286.97 6608.01 6656.06 3621.74 3810.35 3656.26 1031.11 - 3507.86 0.90 5971935.43 266717.01 N 70 19 28.730 W 147 53 30.709 8352.95 57.83 286.98 6629.93 6677.98 3656.40 3845.29 3691.21 1041.31 - 3541.28 0.34 5971946.65 266683.92 N 70 19 28.830 W 147 53 31.684 8394.25 57.60 286.94 6651.99 6700.04 3691.04 3880.21 3726.12 1051.50 - 3574.68 0.56 5971957.85 266650.85 N 70 19 28.930 W 147 53 32.659 8435.55 57.77 286.96 6674.07 6722.12 3725.66 3915.11 3761.02 1061.68 - 3608.06 0.41 5971969.05 266617.80 N 70 19 29.030 W 147 53 33.634 8476.85 57.88 286.99 6696.06 6744.11 3760.33 3950.07 3795.98 1071.88 - 3641.50 0.27 5971980.27 266584.69 N 7019 29.131 W 147 53 34.610 8518.14 57.87 287.05 6718.02 6766.07 3795.02 3985.04 3830.94 1082.12 - 3674.93 0.13 5971991.53 266551.59 N 7019 29.231 W 147 53 35.586 8559.45 57.68 287.08 6740.05 6788.10 3829.69 4019.98 3865.89 1092.37 - 3708.34 0.46 5972002.80 266518.51 N 7019 29.332 W 147 53 36.561 8600.70 57.42 287.10 6762.18 6810.23 3864.23 4054.79 3900.69 1102.60 - 3741.61 0.63 5972014.04 266485.57 N 70 19 29.432 W 147 53 37.533 8642.05 57.35 287.17 6784.47 6832.52 3898.79 4089.62 3935.52 1112.86 - 3774.90 0.22 5972025.32 266452.61 N 70 19 29.533 W 147 53 38.504 8683.50 57.42 287.19 6806.81 6854.86 3933.44 4124.54 3970.43 1123.18 - 3808.25 0.17 5972036.65 266419.59 N 70 19 29.634 W 147 53 39.4 8724.95 57.12 287.18 6829.22 6877.27 3968.04 4159.40 4005.30 1133.48 - 3841.57 0.72 5972047.96 266386.61 N 70 19 29.735 W 147 53 40. Tie -In Survey 8724.95 57.12 287.18 6829.22 6877.27 3968.04 4159.41 4005.30 1133.48 - 3841.57 0.00 5972047.96 266386.61 N 70 19 29.735 W 147 53 40. Top Window 8728.00 57.09 287.18 6830.88 6878.93 3970.58 4161.97 4007.86 1134.23 - 3844.01 0.98 5972048.79 266384.19 N 70 19 29.743 W 147 53 40.522 Inc +Trend 8782.02 56.72 284.69 6860.38 6908.43 4015.36 4207.22 4053.11 1146.66 - 3887.52 3.92 5972062.54 266341.08 N 70 19 29.865 W 147 53 41.792 8877.43 53.59 280.29 6914.90 6962.95 4091.98 4285.50 4131.19 1163.64 - 3963.92 5.01 5972081.86 266265.24 N 70 19 30.031 W 147 53 44.022 8972.63 51.54 275.91 6972.78 7020.83 4164.57 4361.08 4205.98 1174.33 - 4038.72 4.24 5972094.83 266190.81 N 70 19 30.136 W 147 53 46.206 9068.05 50.71 271.51 7032.69 7080.74 4234.10 4435.35 4278.51 1179.15 - 4112.82 3.69 5972101.91 266116.90 N 70 19 30.183 W 147 53 48.368 MWD+IFR+MS 9161.57 48.90 267.20 7093.06 7141.11 4298.88 4506.77 4346.98 1178.38 - 4184.21 4.02 5972103.33 266045.52 N 70 19 30.175 W 147 53 50.452 9255.76 46.57 264.84 7156.41 7204.46 4360.28 4576.46 4412.66 1173.57 - 4253.74 3.09 5972100.65 265975.88 N 70 19 30.128 W 147 53 52.482 9351.81 42.76 264.20 7224.71 7272.76 4418.91 4643.97 4475.79 1167.14 - 4320.94 3.99 5972096.28 265908.52 N 70 19 30.064 W 147 53 54.443 9445.51 39.32 263.77 7295.37 7343.42 4472.03 4705.48 4533.22 1160.70 - 4382.11 3.68 5972091.72 265847.18 N 70 19 30.000 W 147 53 56.228 9538.36 36.38 264.46 7368.68 7416.73 4521.29 4762.45 4586.54 1154.85 - 4438.77 3.20 5972087.60 265790.36 N 70 19 29.942 W 147 53 57.882 9634.95 33.26 266.53 7447.97 7496.02 4569.60 4817.59 4638.67 1150.48 - 4493.74 3.45 5972084.92 265735.29 N 70 19 29.899 W 147 53 59.487 9729.91 29.13 266.25 7529.18 7577.23 4613.08 4866.76 4685.48 1147.39 - 4542.82 4.35 5972083.34 265686.15 N 70 19 29.868 W 147 54 0.919 9823.28 25.66 266.63 7612.07 7660.12 4651.06 4909.72 4726.40 1144.71 - 4585.69 3.72 5972081.97 265643.21 N 70 19 29.842 W 147 54 2.170 9917.61 23.63 267.61 7697.80 7745.85 4686.06 4949.05 4764.05 1142.72 - 4624.97 2.20 5972081.19 265603.89 N 70 19 29.822 W 147 54 3.317 10012.23 20.24 264.18 7785.56 7833.61 4717.18 4984.38 4797.69 1140.27 - 4660.21 3.83 5972079.82 265568.59 N 70 19 29.798 W 147 54 4.345 10105.61 17.72 266.25 7873.86 7921.91 4743.71 5014.75 4826.47 1137.70 - 4690.47 2.79 5972078.18 265538.28 N 70 19 29.772 W 147 54 5.228 10198.40 14.25 269.61 7963.05 8011.10 4766.56 5040.29 4851.04 1136.70 - 4715.99 3.87 5972077.96 265512.74 N 70 19 29.762 W 147 54 5.0 10292.19 10.79 274.61 8054.60 8102.65 4785.33 5060.61 4870.93 1137.33 - 4736.29 3.86 5972079.21 265492.47 N 70 19 29.768 W 147 54 6.566 10386.88 6.97 280.46 8148.14 8196.19 4799.26 5075.21 4885.43 1139.08 - 4750.78 4.14 5972081.40 265478.04 N 70 19 29.785 W 147 54 6.989 10481.07 2.88 275.37 8241.96 8290.01 4807.05 5083.29 4893.48 1140.34 - 4758.76 4.36 5972082.91 265470.10 N 70 19 29.798 W 147 54 7.222 10576.82 0.46 234.38 8337.67 8385.72 4809.52 5086.01 4896.11 1140.35 - 4761.46 2.66 5972082.99 265467.40 N 70 19 29.798 W 147 54 7.301 10672.33 2.65 105.95 8433.14 8481.19 4807.53 5088.13 4894.16 1139.51 - 4759.65 3.10 5972082.11 265469.18 N 70 19 29.790 W 147 54 7.248 10765.48 5.69 90.20 8526.04 8574.09 4801.18 5094.86 4887.51 1138.91 - 4752.96 3.46 5972081.29 265475.85 N 70 19 29.784 W 147 54 7.053 10861.75 8.46 83.16 8621.57 8669.62 4790.76 5106.71 4876.22 1139.73 - 4741.16 3.01 5972081.76 265487.67 N 70 19 29.792 W 147 54 6.708 10956.38 10.32 80.61 8714.93 8762.98 4777.74 5122.14 4861.89 1141.95 - 4725.88 2.01 5972083.50 265503.01 N 70 19 29.814 W 147 54 6.262 11051.35 10.34 77.71 8808.36 8856.41 4763.81 5139.17 4846.40 1145.15 - 4709.16 0.55 5972086.19 265519.82 N 70 19 29.845 W 147 54 5.774 11145.77 10.51 78.22 8901.22 8949.27 4750.04 5156.25 4831.01 1148.71 - 4692.45 0.20 5972089.24 265536.63 N 70 19 29.880 W 147 54 5.286 SurveyEditor Ver SP 2.1 Bld( users) 4- 04\ 4- 04/T- 26 \4- 04ATT- 30 \4- 04A/T -30 Generated 5/19/2009 12:27 PM Page 10 of 11 Measured Azimuth Vertical Along Hole NS EW Comments Depth Inclination True Sub -Sea TVD TVD Section Departure Closure True North True North DLS Northing Easting Latitude Longitude (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (ft ) (deg/100ft) (ftUS) (ftUS) 11240.45 10.11 76.72 8994.37 9042.42 4736.47 5173.20 4815.82 1152.38 - 4675.91 0.51 5972092.40 265553.27 N 70 19 29.917 W 147 54 4.804 11335.07 9.97 75.69 9087.54 9135.59 4723.48 5189.69 4801.21 1156.31 - 4659.89 0.24 5972095.84 265569.41 N 70 19 29.955 W 147 54 4.336 11429.80 9.50 76.77 9180.91 9228.96 4710.87 5205.71 4787.04 1160.13 - 4644.33 0.53 5972099.18 265585.07 N 70 19 29.993 W 147 54 3.882 11524.49 8.70 77.06 9274.41 9322.46 4698.96 5220.69 4773.71 1163.52 - 4629.75 0.85 5972102.12 265599.75 N 70 19 30.027 W 147 54 3.457 11619.52 8.21 78.56 9368.40 9416.45 4687.73 5234.66 4761.19 1166.48 - 4616.09 0.57 5972104.66 265613.49 N 70 19 30.056 W 147 54 3.058 11712.89 9.08 82.04 9460.71 9508.76 4676.08 5248.69 4748.36 1168.82 - 4602.26 1.09 5972106.58 265627.39 N 70 19 30.079 W 147 54 2.654 11804.90 9.85 84.63 9551.47 9599.52 4663.10 5263.82 4734.23 1170.56 - 4587.23 0.96 5972107.86 265642.46 N 7019 30.096 W 147 54 2.216 11899.84 10.72 90.56 9644.88 9692.93 4647.95 5280.75 4718.01 1171.24 - 4570.32 1.44 5972108.01 265659.39 N 70 19 30.103 W 147 54 1.722 11994.81 10.47 91.04 9738.24 9786.29 4631.93 5298.21 4701.04 1170.99 - 4552.86 0.28 5972107.24 265676.83 N 7019 30.100 W 147 54 1.212 12088.79 10.95 91.56 9830.58 9878.63 4615.85 5315.68 4684.03 1170.59 - 4535.40 0.52 5972106.30 265694.27 N 7019 30.097 W 147 54 0.703 12183.01 11.21 92.39 9923.04 9971.09 4599.10 5333.79 4666.35 1169.97 - 4517.30 0.32 5972105.12 265712.34 N 70 19 30.091 W 147 54 0.175 12279.03 11.55 92.17 10017.17 10065.22 4581.53 5352.73 4647.84 1169.22 - 4498.37 0.36 5972103.79 265731.24 N 70 19 30.083 W 147 53 59.6 12373.82 11.96 91.81 10109.98 10158.03 4563.66 5372.04 4628.99 1168.55 - 4479.07 0.44 5972102.53 265750.51 N 70 19 30.077 W 147 53 59. 12468.22 12.37 91.08 10202.26 10250.31 4545.32 5391.94 4609.63 1168.05 - 4459.19 0.46 5972101.42 265770.37 N 70 19 30.072 W 147 53 58. Last Survey 12513.65 12.55 90.68 10246.62 10294.67 4536.32 5401.74 4600.11 1167.90 - 4449.39 0.44 5972100.97 265780.16 N 70 19 30.071 W 147 53 58.192 I TD (Project) 12600.00 12.55 90.68 10330.90 10378.95 4519.13 5420.50 4581.91 1167.67 - 4430.62 0.00 5972100.18 265798.90 N 70 19 30.069 W 147 53 57.645 Survey Type: Definitive Survey NOTES: GCT -MS - ( Schiumberger GCT multishot -- GCT surveys in casing or open hole. GCT = "Gyro Continuous Tool ".) INC +Trend - ( Inclinometer + known azi trend -- Inclination only surveys in near - vertical hole -where formation dip and experience enables direction of drift to be predicted. Replaces ex -BP "Inclinometer (azimuth in known quadrant)" model. ) MWD + IFR + MS - (In -field referenced MWD with mult- station analysis and correction applied in post - processing. Assumes a BHA sag correction is applied to enhance inclination accuracy. ) Legal Description: Northing (Y) fftUSI Eastinq (X) fftUS1 Surface : 2577 FSL 846 FEL S8 T11N R17E UM 5970797.44 270191.51 BHL : 3744 FSL 5273 FEL S8 T11 N R17E UM 5972100.18 265798.90 SurveyEditor Ver SP 2.1 Bld( users) 4- 04\ 4- 04/T- 26 \4- 04A/T- 30 \4- 04A/T -30 Generated 5/19/2009 12:27 PM Page 11 of 11 t SCHLUMBERGER Survey report 28- Mar -2009 11:09:35 Page 1 of 15 Client • BPXA Field • Endicott Well • 4- 04A /T -30 Spud date • 22- Mar -09 API number • 50- 029 - 21968 -01 Last survey date • 28- Mar -09 III Engineer • N.Beck /J.Hovard Total accepted surveys...: 405 MD of first survey 0.00 ft COUNTY North Slope Borough MD of last survey • 12600.00 ft STATE. • Alaska Survey calculation methods Geomagnetic data Method for positions • Minimum curvature Magnetic model • BGGM version 2008 Method for DLS • Mason & Taylor Magnetic date - 23- Mar -2009 Magnetic field strength..: 57735.39 GAMA Depth reference Magnetic dec ( +E /W -) 23.18 degrees Permanent datum • GROUND LEVEL Magnetic dip 81.02 degrees Depth reference • Driller's Depth GL above permanent • 14.50 ft MWD survey Reference Criteria KB above permanent • N/A Topdrive Reference G 1002.68 mGal DF above permanent • 48.05 ft Reference H • 57735.50 GAMA Reference Dip 81.02 degrees Vertical section origin Tolerance of G • ( + / -) 2.50 mGal Latitude ( +N /S -) 0.00 ft Tolerance of H • ( +/- )300.00 GAMA Departure ( +E /W -) • 0.00 ft Tolerance of Dip • ( + / -) 0.45 degrees Platform reference point Corrections Latitude ( +N /S -) - 999.25 ft Magnetic dec ( +E /W -) • 23.18 degrees III Departure ( +E /W -) • - 999.25 ft Grid convergence ( +E /W - ).: 0.00 degrees Total az corr (+E/W-) 23.18 degrees Azimuth from Vsect Origin to target: 270.00 degrees (Total az corr = magnetic dec - grid conv) Survey Correction Type .... I =Sag Corrected Inclination M= Schlumberger Magnetic Correction S =Shell Magnetic Correction F= Failed Axis Correction R= Magnetic Resonance Tool Correction D =Dmag Magnetic Correction [(c)2009 IDEAL ID13 0C 14] irb (Jr\ SCHLUMBERGER Survey Report 28- Mar -2009 15:10:37 Page 2 of 15 Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool # depth angle angle length depth section +N /S- +E /W- displ Azim (deg/ tool Corr (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg) 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2 33.55 0.00 0.00 33.55 33.55 0.00 0.00 0.00 0.00 0.00 0.00 3 36.40 0.62 232.89 2.85 36.40 0.01 -0.01 -0.01 0.02 232.89 21.75 4 47.00 0.40 217.31 10.60 47.00 0.08 -0.07 -0.08 0.11 227.65 2.44 BP GCT MS 5 57.60 0.37 209.35 10.60 57.60 0.12 -0.13 -0.12 0.18 222.06 0.58 BP GCT MS 1 1111 6 68.20 0.42 207.99 10.60 68.20 0.15 -0.20 -0.15 0.25 218.17 0.48 BP_GCT_MS 7 78.80 0.47 208.47 10.60 78.80 0.19 -0.27 -0.19 0.33 215.72 0.47 BP GCT MS 8 87.70 0.50 208.98 8.90 87.70 0.23 -0.34 -0.23 0.41 214.43 0.34 BP GCT MS 9 94.00 0.53 209.47 6.30 94.00 0.26 -0.38 -0.26 0.46 213.79 0.48 BP_GCT_MS 10 108.80 0.58 210.35 14.80 108.80 0.33 -0.51 -0.33 0.61 212.88 0.34 BP GCT MS 11 122.70 0.58 208.67 13.90 122.70 0.40 -0.63 -0.40 0.75 212.25 0.12 BP GCT MS 12 136.65 0.57 206.68 13.95 136.65 0.46 -0.76 -0.46 0.89 211.53 0.16 BP GCT MS 13 150.65 0.52 207.90 14.00 150.65 0.52 -0.87 -0.52 1.02 210.97 0.37 BP GCT MS 14 164.75 0.42 209.00 14.10 164.74 0.58 -0.98 -0.58 1.13 210.71 0.71 BP GCT MS 15 178.75 0.35 207.26 14.00 178.74 0.62 -1.06 -0.62 1.23 210.52 0.51 BP GCT MS 16 192.90 0.32 203.91 14.15 192.89 0.66 -1.13 -0.66 1.31 210.21 0.25 BP GCT MS 17 207.05 0.27 199.12 14.15 207.04 0.69 -1.20 -0.69 1.38 209.76 0.39 BP GCT MS 18 221.15 0.23 195.48 14.10 221.14 0.70 -1.26 -0.70 1.44 209.24 0.31 BP GCT MS 19 235.30 0.20 192.49 14.15 235.29 0.72 -1.31 -0.72 1.49 208.71 0.23 BP_GCT_MS 20 249.50 0.18 189.51 14.20 249.49 0.73 -1.36 -0.73 1.54 208.18 0.16 BP GCT MS 21 263.70 0.18 190.09 14.20 263.69 0.73 -1.40 -0.73 1.58 207.67 0.01 BP GCT MS 22 277.90 0.18 191.02 14.20 277.89 0.74 -1.44 -0.74 1.62 207.21 0.02 BP GCT MS 23 292.10 0.17 190.20 14.20 292.09 0.75 -1.49 -0.75 1.67 206.78 0.07 BP GCT MS III 24 306.40 0.15 189.45 14.30 306.39 0.76 -1.53 -0.76 1.70 206.39 0.14 BP GCT - MS BP 25 320.70 0.12 190.84 14.30 320.69 0.76 -1.56 -0.76 1.74 206.08 0.21 GCT MS 26 335.00 0.10 195.29 14.30 334.99 0.77 -1.59 -0.77 1.76 205.87 0.15 BP GCT MS 27 349.25 0.08 200.03 14.25 349.24 0.78 -1.61 -0.78 1.79 205.77 0.15 BP GCT MS 28 363.45 0.05 238.08 14.20 363.44 0.78 -1.62 -0.78 1.80 205.84 0.36 BP GCT MS 29 377.65 0.03 293.92 14.20 377.64 0.79 -1.62 -0.79 1.81 206.07 0.29 BP GCT MS 30 391.75 0.05 304.81 14.10 391.74 0.80 -1.62 -0.80 1.81 206.38 0.15 BP GCT MS [(c)2009 IDEAL ID13 0C 14] SCHLUMBERGER Survey Report 28- Mar -2009 15:10:37 Page 3 of 15 Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool # depth angle angle length depth section +N /S- +E /W- displ Azim (deg/ tool Corr (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg) 31 405.75 0.07 294.86 14.00 405.74 0.81 -1.61 -0.81 1.80 206.84 0.16 BP_GCT_MS 32 419.65 0.13 347.79 13.90 419.64 0.83 -1.59 -0.83 1.79 207.43 0.75 BP_GCT_MS 33 433.65 0.38 42.26 14.00 433.64 0.80 -1.54 -0.80 1.74 207.37 2.30 BP_GCT_MS 34 447.70 0.78 41.89 14.05 447.69 0.70 -1.44 -0.70 1.60 206.08 2.85 BP_GCT_MS 35 461.75 1.08 40.33 14.05 461.74 0.55 -1.26 -0.55 1.38 203.64 2.14 BP_GCT_MS ID 36 475.90 1.13 41.59 14.15 475.89 0.37 -1.06 -0.37 1.12 199.49 0.39 BP_GCT_MS 37 489.95 0.93 46.30 14.05 489.94 0.20 -0.88 -0.20 0.90 192.86 1.54 BP_GCT_MS 38 504.10 0.62 67.73 14.15 504.08 0.05 -0.77 -0.05 0.77 183.43 2.96 BP_GCT_MS 39 518.20 0.60 113.62 14.10 518.18 -0.09 -0.77 0.09 0.77 173.15 3.38 BP_GCT_MS 40 532.25 1.05 147.29 14.05 532.23 -0.23 -0.91 0.23 0.93 165.79 4.58 BP_GCT_MS 41 546.30 1.62 158.08 14.05 546.28 -0.37 -1.20 0.37 1.25 162.71 4.42 BP GCT MS 42 560.20 2.22 165.25 13.90 560.17 -0.51 -1.64 0.51 1.72 162.58 4.64 BP_GCT_MS 43 574.15 2.77 171.52 13.95 574.11 -0.63 -2.24 0.63 2.32 164.18 4.40 BP_GCT_MS 44 588.15 3.28 176.28 14.00 588.09 -0.71 -2.97 0.71 3.05 166.57 4.06 BP_GCT_MS 45 602.25 3.68 179.02 14.10 602.16 -0.74 -3.82 0.74 3.90 169.00 3.07 BP_GCT_MS 46 616.35 4.07 181.08 14.10 616.23 -0.74 -4.78 0.74 4.83 171.18 2.94 BP_GCT_MS 47 630.45 4.48 182.73 14.10 630.29 -0.71 -5.83 0.71 5.87 173.09 3.04 BP_GCT_MS 48 644.55 4.75 183.45 14.10 644.34 -0.64 -6.96 0.64 6.99 174.71 1.96 BP_GCT_MS 49 658.65 4.88 184.24 14.10 658.40 -0.56 -8.14 0.56 8.16 176.03 1.03 BP_GCT_MS 50 672.75 5.00 185.18 14.10 672.44 -0.47 -9.35 0.47 9.36 177.15 1.03 BP GCT MS 51 686.85 5.07 185.89 14.10 686.49 -0.35 -10.58 0.35 10.59 178.13 0.66 BP GCT MS 52 700.95 5.15 186.29 14.10 700.53 -0.21 -11.83 0.21 11.83 178.97 0.62 BP_GCT_MS 53 715.05 5.23 186.34 14.10 714.57 -0.07 -13.10 0.07 13.10 179.68 0.57 BP_GCT_MS 54 729.10 5.27 186.34 14.05 728.57 0.07 -14.38 -0.07 14.38 180.28 0.28 BPGCT MS 55 743.20 5.28 186.26 14.10 742.61 0.21 -15.67 -0.21 15.67 180.78 0.09 BP_GCT_MS 56 757.30 5.28 186.10 14.10 756.65 0.35 -16.96 -0.35 16.96 181.19 0.10 BP_GCT_MS 57 771.40 5.28 186.04 14.10 770.69 0.49 -18.25 -0.49 18.25 181.54 0.04 BP_GCT_MS 58 785.50 5.23 186.06 14.10 784.73 0.63 -19.53 -0.63 19.54 181.83 0.35 BP GCT MS 59 799.60 5.18 186.08 14.10 798.77 0.76 -20.80 -0.76 20.82 182.09 0.35 BP_GCT_MS 60 813.70 5.08 185.92 14.10 812.81 0.89 -22.06 -0.89 22.07 182.32 0.72 BP GCT MS [(c)2009 IDEAL ID13 0C 14] SCHLUMBERGER Survey Report 28- Mar -2009 15:10:37 Page 4 of 15 Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool # depth angle angle length depth section +N /S- +E /W- displ Azim (deg/ tool Corr - (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg) 61 827.80 5.00 185.68 14.10 826.86 1.02 -23.29 -1.02 23.31 182.50 0.59 BP_GCT_MS 62 841.90 4.93 185.42 14.10 840.90 1.14 -24.50 -1.14 24.53 182.65 0.52 BP_GCT_MS 63 856.00 4.90 185.25 14.10 854.95 1.25 -25.71 -1.25 25.74 182.78 0.24 BP_GCT_MS 64 870.10 4.88 185.20 14.10 869.00 1.36 -26.90 -1.36 26.94 182.89 0.15 BP_GCT_MS 65 884.25 4.82 184.88 14.15 883.10 1.46 -28.09 -1.46 28.13 182.98 0.47 BP_GCT_MS 66 898.35 4.80 184.66 14.10 897.15 1.56 29.27 -1.56 29.31 183.05 0.19 BP_GCT_MS 67 912.45 4.80 184.55 14.10 911.20 1.66 -30.45 -1.66 30.49 183.11 0.07 BP_GCT_MS 68 926.55 4.82 184.38 14.10 925.25 1.75 -31.63 -1.75 31.68 183.16 0.17 BP_GCT_MS 69 940.70 4.82 184.35 14.15 939.35 1.84 -32.81 -1.84 32.86 183.21 0.02 BP_GCT_MS 70 954.85 4.83 184.29 14.15 953.45 1.93 -34.00 -1.93 34.05 183.24 0.08 BP_GCT_MS 71 968.95 4.83 184.20 14.10 967.50 2.02 -35.18 -2.02 35.24 183.28 0.05 BP GCT MS 1 72 983.05 4.85 184.29 14.10 981.55 2.10 -36.37 -2.10 36.43 183.31 0.15 BP_GCT_MS 73 997.05 4.88 184.36 14.00 995.50 2.19 -37.55 -2.19 37.62 183.34 0.22 BP_GCT_MS 74 1011.00 4.88 184.34 13.95 1009.40 2.28 -38.74 -2.28 38.80 183.37 0.01 BP_GCT_MS 75 1025.10 4.88 184.39 14.10 1023.45 2.37 -39.93 -2.37 40.00 183.40 0.03 BP_GCT_MS 76 1039.20 4.92 184.41 14.10 1037.50 2.47 -41.13 -2.47 41.21 183.43 0.28 BP_GCT_MS 77 1053.40 4.93 184.38 14.20 1051.65 2.56 -42.35 -2.56 42.43 183.46 0.07 BP_GCT_MS 78 1067.55 4.95 184.35 14.15 1065.74 2.65 -43.56 -2.65 43.64 183.48 0.14 BP_GCT_MS 79 1081.70 4.95 184.10 14.15 1079.84 2.74 -44.78 -2.74 44.87 183.50 0.15 BP GCT MS 80 1095.85 4.95 184.04 14.15 1093.94 2.83 -46.00 -2.83 46.09 183.52 0.04 BP_GCT_MS 81 1110.05 4.95 184.20 14.20 1108.08 2.92 -47.22 -2.92 47.31 183.54 0.10 BP_GCT_MS 82 1124.20 4.97 184.07 14.15 1122.18 3.01 -48.44 -3.01 48.54 183.55 0.16 BP_GCT_MS 83 1138.35 4.98 183.92 14.15 1136.28 3.09 -49.67 -3.09 49.76 183.56 0.12 BP_GCT_MS 84 1152.55 4.98 183.91 14.20 1150.42 3.18 50.90 -3.18 51.00 183.57 0.01 BP GCT - MS BP 85 1166.65 4.95 184.01 14.10 1164.47 3.26 -52.11 -3.26 52.22 183.58 0.22 BP_GCT_MS 86 1180.85 4.93 184.07 14.20 1178.62 3.35 -53.33 -3.35 53.44 183.59 0.15 BP_GCT_MS 87 1195.00 4.88 183.86 14.15 1192.72 3.43 -54.54 -3.43 54.65 183.60 0.38 BP GCT MS 88 1209.10 4.87 183.67 14.10 1206.77 3.51 -55.74 -3.51 55.85 183.60 0.13 BP GCT MS 89 1223.10 4.85 183.70 14.00 1220.72 3.58 -56.92 -3.58 57.03 183.60 0.14 BP_GCT_MS 90 1237.00 4.83 183.60 13.90 1234.57 3.66 -58.09 -3.66 58.21 183.60 0.16 BP_GCT_MS [(c)2009 IDEAL ID13 0C 14] SCHLUMBERGER Survey Report 28- Mar -2009 15:10:37 Page 5 of 15 Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool # depth angle angle length depth section +N /S- +E /W- displ Azim (deg/ tool Corr (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg) 91 1251.00 4.80 183.38 14.00 1248.52 3.73 -59.26 -3.73 59.38 183.60 0.25 BP GCT MS 92 1264.90 4.78 183.62 13.90 1262.37 3.80 -60.42 -3.80 60.54 183.60 0.20 BP GCT MS 93 1278.90 4.82 184.00 14.00 1276.32 3.88 -61.59 -3.88 61.71 183.60 0.36 BP_GCT_MS 94 1292.90 4.85 184.05 14.00 1290.27 3.96 -62.77 -3.96 62.89 183.61 0.22 BP_GCT_MS 95 1306.85 4.83 183.90 13.95 1304.17 4.04 -63.94 -4.04 64.07 183.62 0.17 BP GCT MS 96 1320.80 4.83 183.64 13.95 1318.07 4.12 65.11 -4.12 65.24 183.62 0.16 BP_GCT_MS 97 1334.75 4.80 183.43 13.95 1331.97 4.19 -66.28 -4.19 66.41 183.62 0.25 BP GCT MS 98 1348.75 4.77 183.26 14.00 1345.92 4.26 -67.45 -4.26 67.58 183.62 0.24 BP GCT MS 99 1362.65 4.73 183.06 13.90 1359.77 4.32 -68.60 -4.32 68.73 183.61 0.31 BP GCT MS 100 1376.65 4.68 182.85 14.00 1373.73 4.38 -69.74 -4.38 69.88 183.60 0.38 BP GCT MS 101 1390.65 4.65 182.45 14.00 1387.68 4.44 -70.88 -4.44 71.02 183.58 0.32 BP GCT MS 102 1404.60 4.65 182.12 13.95 1401.58 4.48 -72.01 -4.48 72.15 183.56 0.19 BP GCT MS 103 1418.55 4.63 182.13 13.95 1415.49 4.52 -73.14 -4.52 73.28 183.54 0.14 BP_GCT_MS 104 1432.45 4.62 182.10 13.90 1429.34 4.56 -74.26 -4.56 74.40 183.52 0.07 BP GCT MS 105 1446.25 4.62 182.00 13.80 1443.10 4.60 -75.37 -4.60 75.51 183.50 0.06 BP GCT MS 106 1460.10 4.60 181.98 13.85 1456.90 4.64 -76.48 -4.64 76.62 183.47 0.14 BP_GCT_MS 107 1474.00 4.58 181.85 13.90 1470.76 4.68 -77.59 -4.68 77.74 183.45 0.16 BP GCT MS 108 1488.00 4.57 181.71 14.00 1484.72 4.72 -78.71 -4.72 78.85 183.43 0.11 BP_GCT_MS 109 1501.90 4.52 181.61 13.90 1498.57 4.75 -79.81 -4.75 79.95 183.40 0.36 BP_GCT_MS 110 1515.90 4.47 181.43 14.00 1512.53 4.78 -80.91 -4.78 81.05 183.38 0.37 BP GCT MS 111 1529.85 4.35 181.07 13.95 1526.44 4.80 -81.98 -4.80 82.12 183.35 0.88 BP GCT MS 112 1543.85 4.23 180.43 14.00 1540.40 4.81 -83.03 -4.81 83.17 183.32 0.92 BP GCT MS 113 1557.80 4.15 180.30 13.95 1554.31 4.82 -84.05 -4.82 84.19 183.28 0.58 BP GCT MS 114 1571.75 3.98 180.75 13.95 1568.23 4.83 -85.04 -4.83 85.17 183.25 1.24 BP GCT _ MS GCT 115 1585.75 3.80 181.35 14.00 1582.19 4.85 -85.99 -4.85 86.12 183.23 1.32 BP MS 116 1599.65 3.67 182.22 13.90 1596.06 4.87 -86.89 -4.87 87.03 183.21 1.02 BP_GCT_MS 117 1613.60 3.45 182.79 13.95 1609.99 4.91 -87.76 -4.91 87.89 183.20 1.60 BP GCT MS 118 1627.55 3.27 183.17 13.95 1623.91 4.95 -88.57 -4.95 88.71 183.20 1.30 BP_GCT_MS 119 1641.50 3.15 183.81 13.95 1637.84 5.00 -89.35 -5.00 89.49 183.20 0.90 BP GCT MS 120 1655.50 3.02 184.52 14.00 1651.82 5.06 -90.10 -5.06 90.25 183.21 0.97 BP GCT MS [(c)2009 IDEAL ID13 0C 14] SCHLUMBERGER Survey Report 28- Mar -2009 15:10:37 Page 6 of 15 Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool # depth angle angle length depth section +N /S- +E /W- displ Azim (deg/ tool Corr - (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg) 121 1669.40 2.90 185.35 13.90 1665.70 5.12 -90.82 -5.12 90.96 183.23 0.92 BP_GCT_MS 122 1683.40 2.73 186.39 14.00 1679.69 5.19 -91.50 -5.19 91.65 183.25 1.27 BP_GCT_MS 123 1697.40 2.55 187.68 14.00 1693.67 5.27 -92.14 -5.27 92.29 183.27 1.35 BP_GCT_MS 124 1711.40 2.43 189.06 14.00 1707.66 5.36 -92.74 -5.36 92.90 183.30 0.96 BP_GCT_MS 125 1725.35 2.30 190.12 13.95 1721.60 5.45 -93.31 -5.45 93.47 183.34 0.98 BP_GCT_MS 126 1739.30 2.13 190.72 13.95 1735.53 5.55 93.84 -5.55 94.01 183.38 1.23 BP_GCT_MS 127 1753.30 2.03 191.13 14.00 1749.53 5.64 -94.34 -5.64 94.51 183.42 0.72 BP_GCT_MS 128 1767.25 1.93 191.54 13.95 1763.47 5.74 -94.81 -5.74 94.99 183.46 0.72 BP_GCT_MS 129 1781.25 1.83 191.12 14.00 1777.46 5.83 -95.26 -5.83 95.44 183.50 0.72 BP_GCT_MS 130 1795.25 1.80 190.33 14.00 1791.45 5.91 -95.70 -5.91 95.88 183.54 0.28 BP_GCT_MS 131 1809.25 1.78 190.13 14.00 1805.45 5.99 -96.13 -5.99 96.32 183.57 0.15 BP_GCT_MS 132 1823.25 1.75 189.81 14.00 1819.44 6.06 -96.55 -6.06 96.75 183.59 0.23 BP_GCT_MS 133 1837.25 1.70 189.38 14.00 1833.43 6.14 -96.97 -6.13 97.16 183.62 0.37 BP_GCT_MS 134 1851.25 1.63 189.30 14.00 1847.43 6.20 -97.37 -6.20 97.57 183.64 0.50 BP_GCT_MS 135 1865.20 1.57 189.16 13.95 1861.37 6.26 -97.76 -6.26 97.96 183.67 0.43 BP_GCT_MS 136 1879.05 1.52 189.07 13.85 1875.22 6.32 -98.12 -6.32 98.33 183.69 0.36 BP_GCT_MS 137 1892.90 1.45 189.20 13.85 1889.06 6.38 -98.48 -6.38 98.69 183.71 0.51 BP_GCT_MS 138 1906.80 1.38 189.01 13.90 1902.96 6.43 -98.82 -6.43 99.03 183.73 0.50 BP_GCT_MS 139 1920.80 1.33 188.86 14.00 1916.95 6.49 -99.15 -6.49 99.36 183.74 0.36 BP_GCT_MS 140 1934.80 1.25 188.74 14.00 1930.95 6.53 -99.46 -6.53 99.67 183.76 0.57 BP_GCT_MS 141 1948.90 1.12 189.00 14.10 1945.05 6.58 -99.74 -6.58 99.96 183.77 0.92 BP_GCT_MS 142 1962.90 0.97 189.32 14.00 1959.04 6.62 - 100.00 -6.62 100.22 183.79 1.07 BP_GCT_MS 143 1976.95 0.90 189.09 14.05 1973.09 6.66 - 100.22 -6.66 100.44 183.80 0.50 BP_GCT_MS • 144 1990.95 145 2005.00 0.92 188.58 14.00 1987.09 6.69 - 100.44 -6.69 100.67 183.81 0.15 BPGCT MS 0.93 188.09 14.05 2001.14 6.72 -100.67 -6.72 100.89 183.82 0.09 BP_GCT_MS 146 2019.00 0.95 187.91 14.00 2015.14 6.75 - 100.89 -6.75 101.12 183.83 0.14 BP_GCT_MS 147 2032.80 0.97 187.68 13.80 2028.94 6.79 - 101.12 -6.79 101.35 183.84 0.15 BP_GCT_MS 148 2046.65 1.00 187.25 13.85 2042.78 6.82 - 101.36 -6.82 101.59 183.85 0.22 BP_GCT_MS 149 2060.45 1.00 187.10 13.80 2056.58 6.85 - 101.60 -6.85 101.83 183.86 0.02 BP_GCT_MS 150 2074.35 0.97 187.24 13.90 2070.48 6.88 - 101.84 -6.88 102.07 183.86 0.22 BP_GCT_MS [(c)2009 IDEAL ID13 0C 14] SCHLUMBERGER Survey Report 28- Mar -2009 15:10:37 Page 7 of 15 Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool # depth angle angle length depth section +N /S- +E /W- displ Azim (deg/ tool Corr (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg) 151 2088.15 0.90 187.51 13.80 2084.28 6.91 - 102.06 -6.91 102.29 183.87 0.51 BP_GCT_MS 152 2101.95 0.85 187.45 13.80 2098.08 6.93 - 102.27 -6.93 102.50 183.88 0.36 BP_GCT_MS 153 2115.85 0.85 187.08 13.90 2111.97 6.96 - 102.47 -6.96 102.71 183.89 0.04 BP_GCT_MS 154 2129.65 0.80 187.20 13.80 2125.77 6.98 - 102.67 -6.98 102.91 183.89 0.36 BP_GCT_MS 155 2143.50 0.77 187.28 13.85 2139.62 7.01 - 102.86 -7.01 103.10 183.90 0.22 BP_GCT_MS 156 2157.30 0.73 188.09 13.80 2153.42 7.03 103.04 -7.03 103.28 183.90 0.30 BP_GCT_MS 157 2171.10 0.63 189.68 13.80 2167.22 7.06 -103.20 -7.06 103.44 183.91 0.74 BP_GCT_MS 158 2185.00 0.53 191.68 13.90 2181.12 7.08 - 103.34 -7.08 103.58 183.92 0.73 BP_GCT_MS 159 2198.80 0.45 194.09 13.80 2194.92 7.11 - 103.45 -7.11 103.70 183.93 0.60 BP_GCT_MS 160 2212.70 0.42 196.29 13.90 2208.82 7.14 - 103.55 -7.14 103.80 183.94 0.25 BP_GCT_MS 161 2226.50 0.40 197.09 13.80 2222.62 7.17 - 103.65 -7.17 103.90 183.95 0.15 BP_GCT_MS 162 2240.30 0.38 196.69 13.80 2236.42 7.19 - 103.74 -7.19 103.99 183.97 0.15 BP_GCTMS 163 2254.20 0.38 189.92 13.90 2250.32 7.21 - 103.83 -7.21 104.08 183.97 0.32 BP_GCT__MS 164 2268.00 0.42 182.62 13.80 2264.12 7.22 - 103.92 -7.22 104.17 183.98 0.47 BP_GCT_MS 165 2281.85 0.42 182.49 13.85 2277.97 7.23 - 104.03 -7.23 104.28 183.97 0.01 BP_GCT_MS 166 2295.65 0.40 183.41 13.80 2291.77 7.23 - 104.12 -7.23 104.37 183.97 0.15 BP_GCT_MS 167 2309.35 0.43 183.26 13.70 2305.47 7.24 - 104.22 -7.24 104.47 183.97 0.22 BP_GCT_MS 168 2323.05 0.48 189.15 13.70 2319.17 7.25 - 104.33 -7.25 104.58 183.98 0.50 BP_GCT_MS 169 2336.75 0.50 196.86 13.70 2332.86 7.28 - 104.44 -7.28 104.70 183.99 0.50 BP_GCT_MS 170 2350.60 0.48 198.22 13.85 2346.71 7.31 - 104.56 -7.31 104.81 184.00 0.17 BP_GCT_MS 171 2364.40 0.47 197.31 13.80 2360.51 7.35 - 104.67 -7.35 104.92 184.02 0.09 BP_GCT_MS 172 2378.20 0.47 196.29 13.80 2374.31 7.38 - 104.78 -7.38 105.03 184.03 0.06 BP_GCT_MS 173 2392.00 0.45 196.06 13.80 2388.11 7.41 - 104.88 -7.41 105.14 184.04 0.15 BP_GCT_MS 174 2405.85 0.45 194.24 13.85 2401.96 7.44 104.99 7.44 105.25 184.05 0.10 BP GCT - MS BP 175 2419.65 0.43 190.19 13.80 2415.76 7.46 -105.09 -7.46 105.35 184.06 0.27 BP_GCT_MS 176 2433.55 0.43 185.11 13.90 2429.66 7.48 - 105.19 -7.48 105.46 184.07 0.27 BP_GCT_MS 177 2447.35 0.43 181.91 13.80 2443.46 7.48 - 105.30 -7.48 105.56 184.06 0.17 BP_GCT_MS 178 2461.15 0.43 180.69 13.80 2457.26 7.49 - 105.40 -7.49 105.67 184.06 0.07 BP_GCT_MS 179 2475.05 0.40 182.58 13.90 2471.16 7.49 - 105.50 -7.49 105.77 184.06 0.24 BP_GCT_MS 180 2488.85 0.37 185.89 13.80 2484.96 7.49 - 105.59 -7.49 105.86 184.06 0.27 BP_GCT_MS [(c)2009 IDEAL ID13 0C 14] SCHLUMBERGER Survey Report 28- Mar -2009 15:10:37 Page 8 of 15 Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool # depth angle angle length depth section +N /S- +E/W- displ Azim (deg/ tool Corr - (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg) 181 2502.70 0.35 184.94 13.85 2498.81 7.50 - 105.68 -7.50 105.95 184.06 0.15 BP_GCT_MS 182 2516.60 0.33 184.18 13.90 2512.71 7.51 - 105.76 -7.51 106.03 184.06 0.15 BP_GCT_MS 183 2530.40 0.35 187.75 13.80 2526.51 7.52 - 105.84 -7.52 106.11 184.06 0.21 BP_GCT_MS 184 2544.30 0.38 189.87 13.90 2540.41 7.53 - 105.93 -7.53 106.20 184.07 0.24 BP_GCT_MS 185 2558.10 0.43 189.69 13.80 2554.21 7.55 - 106.03 -7.55 106.30 184.07 0.36 BP_GCT_MS • 186 2571.95 0.43 202.36 13.85 2568.06 7.58 106.13 -7.58 106.40 184.08 0.69 BP GCTMS 187 2585.80 0.50 230.46 13.85 2581.91 7.64 -106.21 -7.64 106.49 184.12 1.70 BP_GCT_MS 188 2599.70 0.72 254.17 13.90 2595.81 7.77 - 106.28 -7.77 106.56 184.18 2.38 BP_GCT_MS 189 2613.50 1.03 267.27 13.80 2609.61 7.98 - 106.30 -7.98 106.60 184.29 2.66 BP_GCT_MS 190 2627.40 1.43 276.81 13.90 2623.50 8.28 - 106.29 -8.28 106.61 184.45 3.22 BP_GCT_MS 191 2641.20 1.87 284.37 13.80 2637.30 8.67 - 106.21 -8.67 106.57 184.67 3.55 BP_GCT_MS 192 2655.00 2.38 290.66 13.80 2651.09 9.15 - 106.06 -9.15 106.45 184.93 4.06 BP_GCT_MS 193 2668.90 2.90 296.60 13.90 2664.97 9.74 - 105.80 -9.74 106.24 185.26 4.22 BP_GCT_MS 194 2682.80 3.40 300.74 13.90 2678.85 10.41 - 105.43 -10.41 105.94 185.64 3.95 BP_GCT_MS 195 2696.65 3.80 303.42 13.85 2692.67 11.14 - 104.97 -11.14 105.56 186.06 3.13 BP_GCT_MS 196 2710.50 4.15 303.71 13.85 2706.49 11.94 - 104.44 -11.94 105.12 186.52 2.53 BP_GCT_MS 197 2724.35 4.43 301.08 13.85 2720.30 12.82 - 103.88 -12.82 104.67 187.03 2.47 BP_GCT_MS 198 2738.15 4.77 299.69 13.80 2734.06 13.77 - 103.32 -13.77 104.24 187.59 2.59 BP_GCT_MS 199 2751.90 5.18 299.53 13.75 2747.75 14.81 - 102.73 -14.81 103.80 188.20 2.98 BP_GCT_MS 200 2765.65 5.55 299.55 13.75 2761.44 15.93 - 102.10 -15.93 103.33 188.87 2.69 BP_GCT_MS 201 2779.45 5.83 299.41 13.80 2775.18 17.12 - 101.43 -17.12 102.86 189.58 2.03 BP_GCT_MS 202 2793.35 6.10 300.94 13.90 2789.00 18.37 - 100.70 -18.37 102.36 190.34 2.25 BP_GCT_MS 203 2807.25 6.37 304.26 13.90 2802.82 19.64 -99.89 -19.64 101.80 191.12 3.24 BP_GCT_MS . 204 2821.15 6.63 307.31 13.90 2816.63 20.91 98.97 20.91 101.15 191.93 3.11 BPGCT MS 205 2834.95 7.02 309.17 13.80 2830.33 22.20 -97.95 -22.20 100.43 192.77 3.25 BP_GCT_MS 206 2848.60 7.33 309.53 13.65 2843.88 23.52 -96.87 -23.52 99.68 193.65 2.29 BP_GCT_MS 207 2862.30 7.47 310.33 13.70 2857.46 24.87 -95.74 -24.87 98.91 194.56 1.27 BP_GCT_MS 208 2876.00 7.60 312.16 13.70 2871.04 26.22 -94.55 -26.22 98.12 195.50 1.99 BP_GCT_MS 209 2889.65 7.92 314.67 13.65 2884.57 27.56 -93.28 -27.56 97.27 196.46 3.41 BP_GCT_MS 210 2903.35 8.32 317.47 13.70 2898.13 28.90 -91.89 -28.90 96.33 197.46 4.11 BP_GCT_MS [(c)2009 IDEAL ID13 0C 14] SCHLUMBERGER Survey Report 28- Mar -2009 15:10:37 Page 9 of 15 S eq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool # depth angle angle length depth section +N /S- +E /W- displ Azim (deg/ tool Corr (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg) 2 11 2917.10 8.70 319.35 13.75 2911.73 30.25 -90.37 -30.25 95.30 198.51 3.42 BP_GCT_MS 212 2930.70 9.05 320.45 13.60 2925.17 31.60 -88.76 -31.60 94.22 199.60 2.86 BP_GCT_MS 213 2944.40 9.38 321.98 13.70 2938.69 32.98 -87.05 -32.98 93.09 200.75 3.00 BP_GCT_MS 214 2958.10 9.70 323.79 13.70 2952.20 34.35 -85.24 -34.35 91.90 201.95 3.20 BP_GCTMS 215 2971.70 9.97 324.56 13.60 2965.60 35.71 -83.36 -35.71 90.68 203.19 2.21 BP_GCT_MS 216 2985.40 10.20 323.29 13.70 2979.09 37.12 81.42 37.12 89.48 204.51 2.34 BP_GCT_MS 217 2999.10 10.48 321.12 13.70 2992.57 38.63 -79.48 -38.63 88.37 205.92 3.50 BP_GCT_MS 218 3012.70 10.83 320.00 13.60 3005.93 40.22 -77.54 -40.22 87.35 207.42 2.99 BP_GCT_MS 219 3026.40 11.20 319.78 13.70 3019.38 41.91 -75.53 -41.91 86.38 209.02 2.72 BP_GCT_MS 220 3040.00 11.50 319.55 13.60 3032.71 43.64 -73.49 -43.64 85.48 210.70 2.23 BP_GCT_MS 221 3053.65 11.90 319.20 13.65 3046.08 45.44 -71.39 -45.44 84.63 212.48 2.98 BP_GCT_MS 222 3067.30 12.25 318.94 13.65 3059.43 47.32 -69.24 -47.32 83.86 214.35 2.59 BP_GCT_MS 223 3080.95 12.50 318.53 13.65 3072.76 49.25 -67.04 -49.25 83.18 216.30 1.94 BP_GCT_MS 224 3094.60 12.85 318.05 13.65 3086.08 51.24 -64.80 -51.24 82.61 218.33 2.68 BP_GCT_MS 225 3108.25 13.25 318.11 13.65 3099.38 53.30 -62.51 -53.30 82.15 220.45 2.93 BP_GCT_MS 226 3121.85 13.73 318.77 13.60 3112.60 55.40 -60.13 -55.40 81.76 222.65 3.71 BP_GCT_MS 227 3135.45 14.18 319.21 13.60 3125.80 57.55 -57.66 -57.55 81.47 224.95 3.40 BP_GCT_MS 228 3149.10 14.60 319.17 13.65 3139.02 59.77 -55.09 -59.77 81.29 227.33 3.08 BP_GCT_MS 229 3162.70 15.17 319.12 13.60 3152.16 62.06 -52.45 -62.06 81.25 229.80 4.19 BP_GCT_MS 230 3178.10 15.87 319.13 15.40 3167.00 64.75 -49.33 -64.75 81.40 232.70 4.55 BP_GCT_MS 231 3218.65 17.22 318.67 40.55 3205.87 72.34 -40.63 -72.34 82.97 240.68 3.34 BP_GCT_MS 232 3261.35 18.33 317.46 42.70 3246.53 81.06 -30.94 -81.06 86.76 249.11 2.74 BP_GCT_MS 233 3304.00 19.18 314.62 42.65 3286.92 90.58 -21.08 -90.58 93.00 256.90 2.92 BP_GCT_MS 234 3346.80 19.33 310.35 42.80 3327.33 100.98 11.55 100.98 101.64 263.47 3.31 BP GCT GCT - MS BP 235 3389.60 19.05 306.28 42.80 3367.75 112.01 -2.83 -112.01 112.05 268.55 3.19 MS 236 3432.40 19.18 303.04 42.80 3408.19 123.54 5.14 - 123.54 123.64 272.38 2.50 BP_GCT_MS 237 3475.15 19.80 300.35 42.75 3448.49 135.67 12.62 - 135.67 136.26 275.32 2.55 BP_GCT_MS 238 3517.95 20.57 297.80 42.80 3488.67 148.58 19.79 - 148.58 149.89 277.59 2.73 BP_GCT_MS 239 3560.75 21.53 296.26 42.80 3528.61 162.27 26.77 - 162.27 164.47 279.37 2.59 BP_GCT_MS 240 3603.55 22.55 295.52 42.80 3568.28 176.72 33.78 - 176.72 179.92 280.82 2.47 BP_GCT_MS [(c)2009 IDEAL ID13 0C 14] SCHLUMBERGER Survey Report 28- Mar -2009 15:10:37 Page 10 of 15 S eq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool # depth angle angle length depth section +N /S- +E /W- displ Azim (deg/ tool Corr (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg) 2 41 3646.10 23.48 294.69 42.55 3607.44 191.79 40.84 - 191.79 196.09 282.02 2.31 BP_GCT_MS 242 3688.20 24.33 293.79 42.10 3645.93 207.35 47.84 - 207.35 212.79 282.99 2.20 BP_GCT_MS 243 3730.40 25.12 293.11 42.20 3684.26 223.54 54.86 - 223.54 230.17 283.79 1.99 BP_GCT_MS 244 3772.50 25.87 292.04 42.10 3722.26 240.27 61.82 - 240.27 248.10 284.43 2.09 BP_GCT_MS 245 3814.60 26.60 290.44 42.10 3760.03 257.62 68.56 - 257.62 266.58 284.90 2.41 BP_GCT_MS ill 246 3856.70 27.20 288.79 42.10 3797.57 275.56 74.95 275.56 285.57 285.22 2.27 BP_GCT MS 247 3898.70 27.45 286.52 42.00 3834.89 293.93 80.79 -293.93 304.83 285.37 2.55 BP_GCT_MS 248 3940.85 27.72 284.26 42.15 3872.25 312.74 85.97 - 312.74 324.34 285.37 2.56 BP GCT MS 249 3982.95 28.48 283.18 42.10 3909.38 332.01 90.67 - 332.01 344.16 285.28 2.17 BP_GCT_MS 250 4025.00 29.68 282.88 42.05 3946.13 351.92 95.28 - 351.92 364.59 285.15 2.87 BP_GCT_MS 251 4067.20 30.98 282.76 42.20 3982.56 372.70 100.01 - 372.70 385.88 285.02 3.08 BP_GCT_MS 252 4109.35 32.30 282.76 42.15 4018.44 394.26 104.89 - 394.26 407.97 284.90 3.13 BP_GCT_MS 253 4151.55 33.62 282.85 42.20 4053.85 416.65 109.98 - 416.65 430.92 284.79 3.13 BP_GCT_MS 254 4193.75 34.93 282.99 42.20 4088.72 439.81 115.29 - 439.81 454.67 284.69 3.11 BP_GCT_MS 255 4235.95 36.27 283.15 42.20 4123.03 463.74 120.85 - 463.74 479.23 284.61 3.18 BP_GCT_MS 256 4278.25 37.63 283.37 42.30 4156.83 488.49 126.68 - 488.49 504.65 284.54 3.23 BP_GCT_MS 257 4320.50 38.98 283.65 42.25 4189.99 513.95 132.80 - 513.95 530.83 284.49 3.22 BP_GCT_MS 258 4362.90 40.30 283.93 42.40 4222.64 540.22 139.25 - 540.22 557.88 284.45 3.14 BP_GCT_MS 259 4405.25 41.53 284.26 42.35 4254.64 567.12 146.00 - 567.12 585.61 284.44 2.95 BP_GCT_MS 260 4447.15 42.80 284.52 41.90 4285.70 594.36 152.99 - 594.36 613.74 284.44 3.06 BP_GCT_MS 261 4488.65 44.18 284.71 41.50 4315.80 622.00 160.20 - 622.00 642.30 284.44 3.34 BP_GCT_MS 262 4529.90 45.55 284.87 41.25 4345.04 650.13 167.63 - 650.14 671.40 284.46 3.33 BP_GCT_MS 263 4571.10 46.92 285.00 41.20 4373.54 678.88 175.30 - 678.88 701.15 284.48 3.33 BP_GCT_MS 264 4612.55 48.38 285.18 41.45 4401.46 708.46 183.27 708.46 731.78 284.50 3.54 BP GCT - MS BP 265 4654.10 49.77 285.38 41.55 4428.68 738.74 191.55 -738.74 763.17 284.54 3.37 BP_GCT_MS 266 4695.60 50.83 285.51 41.50 4455.19 769.52 200.05 - 769.52 795.10 284.57 2.57 BP_GCT_MS 267 4737.10 51.72 285.63 41.50 4481.15 800.71 208.74 - 800.71 827.47 284.61 2.16 BP_GCT_MS 268 4778.50 52.32 285.79 41.40 4506.62 832.12 217.58 - 832.12 860.10 284.65 1.48 BP_GCT_MS 269 4820.00 52.35 285.96 41.50 4531.98 863.72 226.56 - 863.72 892.94 284.70 0.33 BP_GCT_MS 270 4861.50 52.30 286.08 41.50 4557.35 895.29 235.63 - 895.29 925.78 284.75 0.26 BP_GCT_MS [(c)2009 IDEAL ID13 0C 14] SCHLUMBERGER Survey Report 28- Mar -2009 15:10:37 Page 11 of 15 Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool # depth angle angle length depth section +N /S- +E /W- displ Azim (deg/ tool Corr - (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg) 271 4903.05 52.15 286.12 41.55 4582.80 926.84 244.74 - 926.84 958.61 284.79 0.37 BP_GCT_MS 272 4944.60 51.92 286.15 41.55 4608.36 958.31 253.84 - 958.31 991.36 284.84 0.56 BP_GCT_MS 273 4986.25 51.85 286.22 41.65 4634.07 989.78 262.97 - 989.78 1024.12 284.88 0.21 BP_GCT_MS 274 5027.85 51.57 286.36 41.60 4659.85 1021.12 272.13 - 1021.12 1056.76 284.92 0.72 BP_GCT_MS 275 5069.50 51.25 286.52 41.65 4685.82 1052.35 281.34 - 1052.35 1089.31 284.97 0.82 BP_GCT_MS 4111 276 5111.15 51.03 286.60 41.65 4711.96 1083.43 290.59 - 1083.43 1121.72 285.01 0.55 BP_GCT_MS 277 5152.65 50.75 286.65 41.50 4738.13 1114.29 299.80 -1114.29 1153.91 285.06 0.68 BP_GCT_MS 278 5194.35 50.43 286.71 41.70 4764.61 1145.15 309.05 - 1145.15 1186.12 285.10 0.78 BP_GCT_MS 279 5235.45 50.17 286.77 41.10 4790.86 1175.43 318.16 - 1175.43 1217.73 285.15 0.64 BP_GCT_MS 280 5276.45 49.98 286.84 41.00 4817.18 1205.53 327.25 - 1205.53 1249.16 285.19 0.48 BP_GCT_MS 281 5317.35 49.72 286.86 40.90 4843.55 1235.45 336.31 - 1235.45 1280.41 285.23 0.64 BP_GCT_MS 282 5358.30 49.37 286.88 40.95 4870.12 1265.27 345.35 - 1265.27 1311.55 285.27 0.86 BP_GCT_MS 283 5399.20 49.05 287.02 40.90 4896.84 1294.89 354.38 - 1294.89 1342.51 285.31 0.82 BP_GCT_MS 284 5440.10 48.58 287.15 40.90 4923.77 1324.31 363.42 - 1324.31 1373.27 285.35 1.17 BP_GCT_MS 285 5481.00 48.48 287.15 40.90 4950.85 1353.60 372.46 - 1353.60 1403.91 285.38 0.24 BP_GCT_MS 286 5522.00 48.77 287.14 41.00 4977.95 1383.00 381.53 - 1383.00 1434.66 285.42 0.71 BP_GCT_MS 287 5562.90 48.62 287.11 40.90 5004.95 1412.36 390.58 - 1412.36 1465.37 285.46 0.37 BP_GCT_MS 288 5603.80 48.25 287.06 40.90 5032.09 1441.61 399.57 - 1441.61 1495.96 285.49 0.91 BP_GCT_MS 289 5644.80 48.02 287.01 41.00 5059.45 1470.80 408.51 - 1470.80 1526.48 285.52 0.57 BP_GCT_MS 290 5685.80 47.87 286.93 41.00 5086.91 1499.92 417.40 - 1499.92 1556.91 285.55 0.39 BP_GCT_MS 291 5726.90 47.77 286.89 41.10 5114.51 1529.06 426.26 - 1529.06 1587.36 285.58 0.25 BP_GCT_MS 292 5767.90 47.62 286.88 41.00 5142.11 1558.07 435.06 - 1558.08 1617.68 285.60 0.37 BP_GCT_MS 293 5808.80 47.47 286.87 40.90 5169.71 1586.95 443.82 - 1586.95 1647.85 285.62 0.37 BP_GCT_MS III 294 5849.50 47.25 286.83 40.70 5197.28 1615.61 452.50 - 1615.61 1677.78 285.65 0.55 BPGCT MS 295 5890.20 47.05 286.77 40.70 5224.96 1644.17 461.13 -1644.17 1707.61 285.67 0.50 BP_GCT_MS 296 5931.15 46.93 286.74 40.95 5252.90 1672.84 469.76 - 1672.84 1737.55 285.69 0.30 BP_GCT_MS 297 5972.30 47.05 286.78 41.15 5280.96 1701.66 478.43 - 1701.66 1767.64 285.70 0.30 BP_GCT_MS 298 6012.80 47.42 286.86 40.50 5308.46 1730.12 487.04 - 1730.12 1797.36 285.72 0.93 BP_GCT_MS 299 6053.40 47.90 286.96 40.60 5335.81 1758.83 495.77 - 1758.83 1827.37 285.74 1.20 BP_GCT_MS 300 6093.90 48.25 287.12 40.50 5362.87 1787.64 504.60 - 1787.64 1857.49 285.76 0.91 BP_GCT_MS [(c)2009 IDEAL ID13 0C 14] SCHLUMBERGER Survey Report 28- Mar -2009 15:10:37 Page 12 of 15 Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool # depth angle angle length depth section +N /S- +E /W- displ Azim (deg/ tool Corr (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg) 301 6134.45 48.60 287.29 40.55 5389.78 1816.62 513.57 - 1816.62 1887.82 285.79 0.92 BP_GCT_MS 302 6175.65 48.93 287.43 41.20 5416.94 1846.19 522.82 - 1846.19 1918.79 285.81 0.84 BP_GCT_MS 303 6218.90 49.05 287.47 43.25 5445.32 1877.32 532.60 - 1877.32 1951.41 285.84 0.29 BP GCT MS 304 6262.20 49.18 287.42 43.30 5473.66 1908.55 542.42 - 1908.55 1984.13 285.87 0.31 BP_GCT_MS 305 6305.45 49.33 287.36 43.25 5501.89 1939.82 552.21 - 1939.82 2016.89 285.89 0.36 BP_GCT_MS 306 6348.70 49.78 287.36 43.25 5529.94 1971.24 562.03 - 1971.24 2049.79 285.91 1.04 BP_GCTMS 307 6392.05 50.40 287.39 43.35 5557.76 2002.97 571.96 -2002.97 2083.03 285.94 1.43 BP_GCT_MS 308 6435.35 50.88 287.44 43.30 5585.22 2034.92 581.98 - 2034.92 2116.50 285.96 1.11 BP_GCT_MS 309 6478.65 51.20 287.49 43.30 5612.44 2067.03 592.08 - 2067.03 2150.16 285.98 0.74 BP_GCT_MS 310 6522.05 51.57 287.52 43.40 5639.53 2099.37 602.28 - 2099.37 2184.06 286.01 0.85 BP_GCT_MS 311 6565.45 52.08 287.54 43.40 5666.35 2131.91 612.56 - 2131.91 2218.17 286.03 1.18 BP_GCT_MS 312 6608.75 52.50 287.57 43.30 5692.84 2164.57 622.89 - 2164.57 2252.41 286.05 0.97 BP_GCT_MS 313 6652.15 52.92 287.57 43.40 5719.13 2197.48 633.32 - 2197.48 2286.92 286.08 0.97 BP_GCT_MS 314 6695.55 53.23 287.52 43.40 5745.20 2230.56 643.77 - 2230.56 2321.61 286.10 0.72 BP_GCT_MS 315 6738.65 53.60 287.45 43.10 5770.89 2263.57 654.17 - 2263.57 2356.21 286.12 0.87 BP_GCT_MS 316 6781.30 54.00 287.39 42.65 5796.08 2296.41 664.48 - 2296.41 2390.61 286.14 0.94 BP_GCT_MS 317 6824.05 54.17 287.32 42.75 5821.16 2329.46 674.80 - 2329.46 2425.23 286.16 0.42 BP_GCT_MS 318 6866.85 54.15 287.29 42.80 5846.22 2362.58 685.12 - 2362.58 2459.92 286.17 0.07 BP_GCT_MS 319 6909.65 54.43 287.34 42.80 5871.20 2395.76 695.47 - 2395.76 2494.66 286.19 0.66 BP_GCT_MS 320 6952.45 54.77 287.41 42.80 5895.99 2429.06 705.89 - 2429.06 2529.54 286.20 0.81 BP_GCT_MS 321 6995.25 54.95 287.45 42.80 5920.63 2462.45 716.37 - 2462.45 2564.54 286.22 0.43 BP_GCT_MS 322 7038.10 55.12 287.43 42.85 5945.19 2495.95 726.89 - 2495.95 2599.64 286.24 0.40 BP_GCT_MS 323 7080.95 55.08 287.31 42.85 5969.70 2529.49 737.39 - 2529.49 2634.78 286.25 0.25 BP_GCT_MS 1111 324 7123.70 55.23 287.20 42.75 5994.13 2563.00 747.79 - 2563.00 2669.86 286.27 0.41 BP GCT MS 325 7166.35 55.58 287.12 42.65 6018.34 2596.54 758.15 -2596.54 2704.96 286.28 0.84 BP_GCT_MS 326 7208.95 55.70 287.03 42.60 6042.39 2630.16 768.48 - 2630.16 2740.13 286.29 0.33 BP_GCT_MS 327 7251.50 55.63 286.96 42.55 6066.39 2663.76 778.75 - 2663.76 2775.26 286.30 0.21 BP GCT MS 328 7294.35 55.63 286.92 42.85 6090.58 2697.60 789.05 - 2697.60 2810.63 286.30 0.08 BP_GCT_MS 329 7337.45 55.53 286.85 43.10 6114.94 2731.62 799.38 - 2731.62 2846.18 286.31 0.27 BP_GCT_MS 330 7380.55 55.40 286.76 43.10 6139.37 2765.61 809.64 - 2765.61 2881.68 286.32 0.35 BP_GCT_MS [(c)2009 IDEAL ID13_0C_14] SCHLUMBERGER Survey Report 28- Mar -2009 15:10:37 Page 13 of 15 Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool # depth angle angle length depth section +N /S- +E /W- displ Azim (deg/ tool Corr (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg) 331 7423.75 55.67 286.70 43.20 6163.82 2799.71 819.90 - 2799.72 2917.30 286.32 0.64 BP_GCT_MS 332 7466.85 55.98 286.68 43.10 6188.03 2833.87 830.14 - 2833.87 2952.96 286.33 0.72 BP_GCT_MS 333 7509.30 55.98 286.65 42.45 6211.78 2867.58 840.23 - 2867.58 2988.14 286.33 0.06 BP_GCT_MS 334 7551.80 56.12 286.58 42.50 6235.51 2901.36 850.31 - 2901.36 3023.39 286.33 0.36 BP_GCT_MS 335 7594.20 56.13 286.48 42.40 6259.15 2935.11 860.32 - 2935.11 3058.60 286.34 0.20 BP_GCT_MS • 336 7636.65 56.10 286.43 42.45 6282.81 2968.90 870.31 - 2968.90 3093.84 286.34 0.12 BP_GCT_MS 337 7679.05 55.95 286.42 42.40 6306.51 3002.63 880.25 -3002.63 3129.00 286.34 0.35 BP_GCT_MS 338 7721.40 55.75 286.46 42.35 6330.28 3036.25 890.17 - 3036.25 3164.05 286.34 0.48 BP_GCT_MS 339 7763.70 55.85 286.57 42.30 6354.06 3069.79 900.11 - 3069.79 3199.03 286.34 0.32 BP_GCT_MS 340 7806.04 55.98 286.65 42.34 6377.79 3103.39 910.14 - 3103.39 3234.10 286.34 0.34 BP_GCT_MS 341 7848.40 56.00 286.66 42.36 6401.48 3137.03 920.20 - 3137.03 3269.21 286.35 0.05 BP_GCT_MS 342 7890.70 56.07 286.66 42.30 6425.11 3170.64 930.26 - 3170.64 3304.29 286.35 0.17 BP_GCT_MS 343 7933.05 56.22 286.60 42.35 6448.71 3204.34 940.32 - 3204.34 3339.46 286.35 0.37 BP_GCT_MS 344 7975.45 56.32 286.48 42.40 6472.25 3238.14 950.36 - 3238.14 3374.72 286.36 0.33 BP_GCT_MS 345 8017.90 56.37 286.45 42.45 6495.77 3272.03 960.38 - 3272.03 3410.06 286.36 0.13 BP_GCT_MS 346 8060.30 56.30 286.48 42.40 6519.28 3305.87 970.38 - 3305.87 3445.35 286.36 0.18 BP_GCT_MS 347 8102.70 56.40 286.54 42.40 6542.77 3339.71 980.41 - 3339.71 3480.64 286.36 0.26 BP_GCTMS 348 8145.10 56.82 286.64 42.40 6566.11 3373.64 990.52 - 3373.64 3516.05 286.36 1.01 BP_GCT__MS 349 8187.45 57.07 286.75 42.35 6589.21 3407.64 1000.72 - 3407.64 3551.54 286.37 0.63 BP_GCT_MS 350 8229.10 57.22 286.84 41.65 6611.80 3441.13 1010.82 - 3441.13 3586.53 286.37 0.40 BP_GCT_MS 351 8270.39 57.60 286.92 41.29 6634.04 3474.42 1020.93 - 3474.42 3621.31 286.37 0.93 BP_GCT_MS 352 8311.70 57.97 286.97 41.31 6656.06 3507.86 1031.11 - 3507.86 3656.26 286.38 0.90 BP_GCT_MS 353 8352.95 57.83 286.98 41.25 6677.98 3541.28 1041.31 - 3541.28 3691.21 286.39 0.34 BP_GCT_MS 4111 354 8394.25 57.60 286.94 41.30 6700.04 3574.67 1051.50 - 3574.68 3726.12 286.39 0.56 BPGCT MS 355 8435.55 57.77 286.96 41.30 6722.12 3608.06 1061.68 -3608.06 3761.02 286.40 0.41 BP_GCT_MS 356 8476.85 57.88 286.99 41.30 6744.11 3641.50 1071.88 - 3641.50 3795.98 286.40 0.27 BP_GCT_MS 357 8518.14 57.87 287.05 41.29 6766.07 3674.93 1082.12 - 3674.93 3830.94 286.41 0.13 BP_GCT_MS 358 8559.45 57.68 287.08 41.31 6788.10 3708.34 1092.37 - 3708.34 3865.89 286.41 0.46 BP_GCT_MS 359 8600.70 57.42 287.10 41.25 6810.23 3741.61 1102.60 - 3741.61 3900.69 286.42 0.63 BP_GCT_MS 360 8642.05 57.35 287.17 41.35 6832.52 3774.90 1112.86 - 3774.90 3935.52 286.43 0.22 BP_GCT_MS [(c)2009 IDEAL ID13 0C 14] SCHLUMBERGER Survey Report 28- Mar -2009 15:10:37 Page 14 of 15 S eq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool # depth angle angle length depth section +N /S- +E /W- displ Azim (deg/ tool Corr (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg) 3 61 8683.50 57.42 287.19 41.45 6854.86 3808.25 1123.18 - 3808.25 3970.43 286.43 0.17 BP_GCT_MS 362 8724.95 57.12 287.18 41.45 6877.27 3841.56 1133.48 - 3841.57 4005.30 286.44 0.72 TIP 363 8728.00 57.09 287.18 3.05 6878.93 3844.01 1134.23 - 3844.01 4007.86 286.44 0.98 BP_GCT_MS 364 8782.02 56.72 284.69 54.02 6908.43 3887.52 1146.66 - 3887.52 4053.11 286.43 3.92 BP_INC +TREND 365 8877.43 53.59 280.29 95.41 6962.95 3963.92 1163.64 - 3963.92 4131.19 286.36 5.01 BP_INC +TREND 366 8972.63 51.54 275.91 95.20 7020.84 4038.72 1174.33 - 4038.72 4205.98 286.21 4.24 BP_INC +TREND 367 9068.05 50.71 271.51 95.42 7080.74 4112.81 1179.15 -4112.81 4278.51 286.00 3.69 BP_INC +TREND 368 9161.57 48.90 267.20 93.52 7141.11 4184.21 1178.38 - 4184.21 4346.98 285.73 4.02 BP_MWD +IFR +MS 369 9255.76 46.57 264.84 94.19 7204.46 4253.73 1173.57 - 4253.74 4412.66 285.42 3.09 BP_MWD +IFR +MS 370 9351.81 42.76 264.20 96.05 7272.76 4320.93 1167.14 - 4320.93 4475.79 285.12 3.99 BP MWD +IFR +MS 371 9445.51 39.32 263.77 93.70 7343.43 4382.11 1160.70 - 4382.11 4533.22 284.84 3.68 BP MWD +IFR +MS 372 9538.36 36.38 264.46 92.85 7416.73 4438.77 1154.85 - 4438.77 4586.54 284.58 3.20 BP_MWD +IFR +MS 373 9634.95 33.26 266.53 96.59 7496.02 4493.74 1150.48 - 4493.74 4638.67 284.36 3.45 BP_MWD +IFR +MS 374 9729.91 29.13 266.25 94.96 7577.24 4542.81 1147.39 - 4542.82 4685.47 284.17 4.35 BP_MWD +IFR +MS 375 9823.28 25.66 266.63 93.37 7660.12 4585.69 1144.71 - 4585.69 4726.40 284.02 3.72 BP_MWD +IFR +MS 376 9917.61 23.63 267.61 94.33 7745.86 4624.97 1142.72 - 4624.97 4764.05 283.88 2.20 BP_MWD +IFR +MS 377 10012.23 20.24 264.18 94.62 7833.62 4660.21 1140.27 - 4660.21 4797.68 283.75 3.83 BP MWD +IFR +MS 378 10105.61 17.72 266.25 93.38 7921.91 4690.46 1137.70 - 4690.46 4826.47 283.63 2.79 BP MWD +IFR +MS 379 10198.40 14.25 269.61 92.79 8011.10 4715.98 1136.70 - 4715.98 4851.04 283.55 3.87 BP_MWD +IFR +MS 380 10292.19 10.79 274.61 93.79 8102.65 4736.28 1137.33 - 4736.28 4870.92 283.50 3.86 BP MWD +IFR +MS 381 10386.88 6.97 280.46 94.69 8196.19 4750.77 1139.08 - 4750.77 4885.42 283.48 4.14 BP_MWD +IFR +MS 382 10481.07 2.88 275.37 94.19 8290.01 4758.75 1140.34 - 4758.75 4893.48 283.48 4.36 BP_MWD +IFR +MS 383 10576.82 0.46 234.38 95.75 8385.72 4761.46 1140.34 - 4761.46 4896.11 283.47 2.66 BP MWD +IFR +MS • 384 10672.33 385 10765.48 2.65 105.95 95.51 8481.20 4759.65 1139.51 - 4759.65 4894.16 283.46 3.10 BP - MWD +IFR +MS 5.69 90.20 93.15 8574.09 4752.96 1138.91 -4752.96 4887.51 283.48 3.46 BP MWD +IFR +MS 386 10861.75 8.46 83.16 96.27 8669.62 4741.15 1139.73 - 4741.15 4876.22 283.52 3.01 BP_MWD +IFR +MS 387 10956.38 10.32 80.61 94.63 8762.98 4725.88 1141.95 - 4725.88 4861.89 283.58 2.01 BP_MWD +IFR +MS 388 11051.35 10.34 77.71 94.97 8856.41 4709.16 1145.15 - 4709.16 4846.39 283.67 0.55 BP_MWD +IFR +MS 389 11145.77 10.51 78.22 94.42 8949.27 4692.45 1148.71 - 4692.45 4831.00 283.76 0.20 BP_MWD +IFR +MS 390 11240.45 10.11 76.72 94.68 9042.42 4675.91 1152.38 - 4675.91 4815.82 283.84 0.51 BP MWD +IFR +MS [(c)2009 IDEAL ID13 0C 14] SCHLUMBERGER Survey Report 28- Mar -2009 15:10:37 Page 15 of 15 Seq Measured Incl Azimuth Course TVD Vertical Displ Displ Total At DLS Srvy Tool # depth angle angle length depth section +N /S- +E /W- displ Azim (deg/ tool Corr (ft) (deg) (deg) (ft) (ft) (ft) (ft) (ft) (ft) (deg) 100f) type (deg) 391 11335.07 9.97 75.69 94.62 9135.60 4659.89 1156.31 - 4659.89 4801.21 283.94 0.24 BP_MWD +IFR +MS 392 11429.80 9.50 76.77 94.73 9228.96 4644.33 1160.13 - 4644.33 4787.04 284.03 0.53 BP_MWD +IFR +MS 393 11524.49 8.70 77.06 94.69 9322.46 4629.74 1163.52 - 4629.75 4773.71 284.11 0.85 BP_MWD +IFR +MS 394 11619.52 8.21 78.56 95.03 9416.46 4616.09 1166.48 - 4616.09 4761.19 284.18 0.57 BP_MWD +IFR +MS 395 11712.89 9.08 82.04 93.37 9508.76 4602.26 1168.82 - 4602.26 4748.36 284.25 1.09 BP_MWD +IFR +MS 396 11804.90 9.85 84.63 92.01 9599.52 4587.23 1170.56 - 4587.23 4734.23 284.32 0.96 BP_MWD +IFR +MS 397 11899.84 10.72 90.56 94.94 9692.94 4570.32 1171.24 - 4570.32 4718.01 284.37 1.44 BP_MWD +IFR +MS 398 11994.81 10.47 91.04 94.97 9786.29 4552.86 1170.99 - 4552.86 4701.04 284.42 0.28 BP_MWD +IFR +MS 399 12088.79 10.95 91.56 93.98 9878.63 4535.40 1170.59 - 4535.40 4684.03 284.47 0.52 BP_MWD +IFR +MS 400 12183.01 11.21 92.39 94.22 9971.09 4517.30 1169.97 - 4517.30 4666.35 284.52 0.32 BP MWD +IFR +MS 401 12279.03 11.55 92.17 96.02 10065.23 4498.37 1169.22 - 4498.37 4647.84 284.57 0.36 BP_MWD +IFR +MS 402 12373.82 11.96 91.81 94.79 10158.03 4479.07 1168.55 - 4479.07 4628.99 284.62 0.44 BP_MWD +IFR +MS 403 12468.22 12.37 91.08 94.40 10250.31 4459.18 1168.05 - 4459.18 4609.63 284.68 0.46 BP_MWD +IFR +MS 404 12513.65 12.55 90.68 45.43 10294.67 4449.38 1167.90 - 4449.38 4600.11 284.71 0.44 BP_MWD+IFR+MS 405 12600.00 12.55 90.68 86.35 10378.96 4430.62 1167.67 - 4430.62 4581.91 284.76 0.00 Projected to TD [(c)2009 IDEAL ID13 0C 14] I 05/14/09 Schbunberger NO. 5235 Alaska Data & Consulting Services Company: State of Alaska 2525 Gambell Street, Suite 400 Alaska Oil & Gas Cons Comm Anchorage, AK 99503 -2838 Attn: Christine Mahnken ATTN: Beth 333 West 7th Ave, Suite 100 Anchorage, AK 99501 I . Well Job # Log Description Date BL . Color CD 1 Z -06 AP3Q -00035 STATIC PRESS/TEMP SURVEY /� -a � 04/25/09 1 E -07A AYQQ -00022 SCMT A(., f — (\C / Opt/ 04/24/09 1 1 V -04 AWJB -00031 MEM GLS c )0(41 — ( 3 j /' j 5 03/24/09 1 1 Y -16 AZ4D -00015 USIT (lc 3 —ot q flQ yam- 05/06/09 1 1 07 -16A B2WY -00002 MEM CBL „, _ -,[ , Q • • 04/29/09 1 1 J -06 ANHY -00009 PRODUCTION PROFILE (� -re),. ) 0 1 K00 05/08/09 1 1 R -21 AVY5-00038 LDL 4;3 — /,) ( / .® f O 05/02/09 1 1 18 -01A B2WY -00003 MEM CBL dam}(, —01_0____ 75a1( 05/01/09 1 1 13 -03 AYKP -00018 SCMT _K-4- - ®(o� ( ®( a 05/01/09 1 1 4- 04A/T -30 BOCV -00014 SCMT ) / Q Co 04/27/09 1 1 03 -09 AXOY -00007 MCNL / 9 to _ (is6(75 12/13/08 1 1 K -16AL2 AXIA -00009 MCNL d han 01/10/09 1 1 02 -13B AWL9 -00028 RST, / —,,-/ I n(} Q. 03/26/09 1 1 C-03B AVY5 -00040 RST —t fi% rn 05/05/09 1 _ 1 • • PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO: BP Exploration (Alaska) Inc. ([ Alaska Data & Consulting Services Petrotechnical Data Center LR2 -1 2525 Gambell Street, - to 400 900 E. Benson Blvd. Anchorage, AK :950- ,838 Anchorage, Alaska 99508 5n92. QU7 ATTN: Beth Date Delivered: Received by ggty111 v 41vska 0 as Go // gA(t0h ((0 4 r SARAH PAL/N, GOVERNOR ALASKA OIL AND GAS 333 W. 7th AVENUE, SUITE 100 CONSERVATION COMMISSION ANCHORAGE, ALASKA 99501 -3539 / PHONE (907) 279 -1433 FAX (907) 276 -7542 Dan Kara Engineering Team Leader BP Exploration Alaska Inc. PO Box 196612 Anchorage AK 99519 -6612 Re: Endicott Field, Endicott Oil Pool, END 4- 04A /T -30 BP Exploration Alaska Inc. Permit No: 209 -019 Surface Location: 2702' FNL, 846' FEL, SEC. 08, T11N, R17E, UM Bottomhole Location: 3723' FSL, 67' FEL, SEC. 07, T11N, R17E, UM Dear Mr. Kara: Enclosed is the approved application for permit to redrill the above referenced development well. This permit to drill does not exempt you from obtaining additional permits or an approval required by law from other governmental agencies and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the Commission reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the Commission specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or a Commission order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. When providing notice for a representative of the Commission to witness any required test, contact the Commission's petroleum field inspector at (907) 659 -3607 (pager). ' o cerely, or Daniel T. Seamount, Jr. Chair DATED this / / day of February, 2009 cc: Department of Fish & Game, Habitat Section w/o encl. Department of Environmental Conservation w/o encl. (qy STATE OF ALASKA ECFNED ALAS IL AND GAS CONSERVATION C07/11 eN ( 6 DR ILL F-E 5 ?0 / -� PERMIT TO alI 20 AAC 25.005 Alaska Off( Ira. ' - / d ". o pia Tag la. Type of work 1 b. Current Well Class ❑ Exploratory ❑ Development Gas 1c. Specify if w pose fo ❑ Drill ® Redrill ❑ Service ❑ Multiple Zone ❑ Coalbed a Gas Hydrates ❑ Re -Entry ❑ Stratigraphic Test ® Development Oil ❑ Single Zone ❑ Shale Gas 2. Operator Name: 5. Bond: IN Blanket ❑ Single Well 11. Well Name and Number: BP Exploration (Alaska) Inc. Bond No. 6194193 END 4 - 04A/T - 3. Address: 6. Proposed Depth: 12. Field / Pool(s): ®ij P.O. Box 196612, Anchorage, Alaska 99519 -6612 MD 12451 TVD 10358 Endicott Field / Endicott Pool 4a. Location of Well (Govemmental Section): 7. Property Designation: Surface: ADL047502 2702' FNL, 846' FEL, SEC. 08, T11 N, R17E, UM Top of Productive Horizon: 8. Land Use Permit: 13. Approximate Spud Date: 3723' FSL, 67' FEL, SEC. 07, T11 N, R17E, UM March 26, 2009 Total Depth: 9. Acres in Property: 14. Distance to Nearest Property: 3723' FSL, 67' FEL, SEC. 07, T11N, R17E, UM 2560 3763' 4b. Location of Well (State Base Plane Coordinates): 10. KB Elevation 15. Distance to Nearest Well Within Pool: Surface: x- 270192 y- 5970798 Zone -ASP3 (Height above GL): 54.70' feet 1700' 16. Deviated Wells: Kickoff Depth: 8700 feet 17. Maximum Anticipated Pressures in psig (see 20 AAC 25.035) Maximum Hole Angle: 57 degrees Downhole: 4438 Surface: 3434 18. Casino Proaram: Specifications Too - Settina Depth - Bottom Quantity of Cement. c.f. or sacks Hole Casing Weight Grade Coupling Length MD TVD MD TVD (including stage data) 8 - 1/2" 7" 26# x -80 1 13 Hydrill 521 3951' 8500' 6757' 12451' 9159' 262 sx Extended 'G'. 166 sx Class 'G' 19 PRESENT WELL CONDITION SUMMARY (To be completed for Redrill and Re - entry Operations) Total Depth MD (ft): Total Depth TVD (ft): Plugs (measured): Effective Depth MD (ft): Effective Depth TVD (ft): Junk (measured): 14228 10415 None 13999 10247 None Casing Length Size Cement Volume MD TVD Conductor / Structural 110' 30" 110' 110' Surface 2500' 13 -3/8" 3441 cu ft Permafrost 2500' 2496' Intermediate 13243' 9-5/8" 575 cu ft Class 'G' 13243' 9694' Production Liner 1095' 7" 495 cu ft Class 'G' 13026' - 14121' 9536' - 10336' Perforation Depth MD (ft): 13677' - 13926' Perforation Depth TVD (ft): 10012' - 10193' 20. Attachments ❑ Filing Fee, $100 ❑ BOP Sketch ® Drilling Program ❑ Time vs Depth Plot ❑ Shallow Hazard Analysis ❑ Property Plat ❑ Diverter Sketch ❑ Seabed Report e Drilling Fluid Program IS 20 AAC 25.050 Requirements 21. Verbal Approval: Commission Representative: Date: 22. I hereby certify that the foregoing is true and correct. Contact Paul Hanson, 564 - 4195 Printed Name Dan Kara Title Engineering Team Leader 7� Prepared By Name/Number: Signature .' )� ic� Phone 564-5667 Date ZI byrD� S ondra Stewman, 564 - 4750 Commission Use Oni Permit To Drill API Number: Permit proval See cover letter for Number: ��9019 50 - 029 21968 - 01 - 00 Date: 4. 11 ' I other reauirements Conditions of Approval: If box is checked, well may not be used to explore for, test, or produce coalbed methane, gas hydrates, or gas contained shales: 50 0 �,r �c , �� Samples Req'd: es I No Mud Log Req'd: ❑ EiNo 4 „_ H Measures: PI Yes ❑ No Directional Survey Req'd: El Yes ❑ No Other: �J l7 /200 APPROVED BY THE COMMISSION ■! Date , COMMISSIONER Form 10-4 1 Revised 1 5 Submit In Duplicate 1 STATE OF ALASKA ,-- %. * ALASIFIL AND GAS CONSERVATION f COMM g I PERMIT TO DRILL ,. 9 20 AAC 25.005 3 ' 1 _�Q 1 a. Type of work 1 b. Current Well Class ❑ Exploratory ❑ Development Ga> 4nk I'1 ail tm JlI ipi ee for: ❑Drill ■- Redrill ❑ Service �� ❑ Multiple Zone D • 4 . 1 thane ❑ Gas Hydrates ❑ Re -Entry ❑ Stratigraphic Test ® Development Oil ❑ Single Zone ❑ : a e 2. Operator Name: 5. Bond: ® Blanket ❑ Single Wel 11. Well Name and Number: BP Exploration (Alaska) Inc. Bond No. 6194193 END 4 - 04AIT - 3. Address: 6. Proposed Depth: 12. Field / Pool(s): P.O. Box 196612, Anchorage, Alaska 99519 -6612 MD 12451 TVD 14 58 Endicott Field / Endicott Pool 4a. Location of Well (Govemmental Section): 7. Property Designation: Surface: ADL047506, ADLs 502 2702' FNL, 846' FEL, SEC. 08, T11N, R17E, UM Top of Productive Horizon: 8. Land Use Permit: 13. Approximate Spud Date: 3723' FSL, 67' FEL, SEC. 07, T11N, R17E, UM March 26, 2009 Total Depth: 9. Acres in Prope , : 14. Distance to Nearest Property: 3723' FSL, 67' FEL, SEC. 07, T11N, R17E, UM 2 - •0 3763' 4b. Location of Well (State Base Plane Coordinates): 10. KB Elevati--n 15. Distance to Nearest Well Within Pool: Surface: x- 270192 y- 5970798 Zone -ASP3 (Height ab• a GL): 54.70' feet 1700' 16. Deviated Wells: Kickoff Depth: 8700 feet 17. Maxim Anticipated Pressures in psig (see 20 AAC 25.035) Maximum Hole Angle: 57 degrees Dow ole: 4438 Surface: 3434 18. Casino Program: Specifications op - Setting Deoth - Bottom Quantity of Cement. c.f. or sacks Hole Casing Weight Grade Coupling Length ,, D TVD MD TVD (including stage data) 8 -1/2" 7" 26# L- 80 /l3Cr -80 Hydrill521 3951' • ... 6757' 12451' 9159' 262 sx Extended 'G'. 166 sx Class 'G' i t ' �� 0) 19 PRESENT WELL CONDITION S 4i RY (To be completed for Redrill and Re - entry Operations) Total Depth MD (ft): Total Depth TVD (ft): Plugs (mea- re 'Effective Depth MD (ft): Effective Depth TVD (ft): Junk (measured): U 14228 1041 No 13999 10247 None Casing Length Size Cement Volume MD TVD Conductor / Structural 110' 30" 110' 110' Surface 2500' 13 -3/8" 3441 cu ft Permafrost 2500' 2496' Intermediate 13243' 9-5/8" 575 cu ft Class 'G' 13243' 9694' Production Liner 1095' 7" 495 cu ft Class 'G' 13026' - 14121' 9536' - 10336' V � Perforation Depth MD (ft): 13677' - 1392. Perforation Depth TVD (ft): 10012' - 10193' 20. Attachments ❑ Filing Fee, $100 • BOP Sketch =i Drilling Program ❑ Time vs Depth Plot ❑ Shallow Hazard Analysis ❑ Property Plat ❑ Diverter Sketch ❑ Seabed Report = Drilling Fluid Program ® 20 AAC 25.050 Requirements 21. Verbal Approval: Commis on Representative: Date: 22. I hereby certify that the fore. • ing is true and correct. Contact Paul Hanson, 564 - 4195 Printed Name Dan Kara Title Engineering Team Leader Prepared By Name/Number Signature 1^ • Phone 564-5667 Date 1.Io3JO1 Sondra Stewman, 564 - 4750 Commission Use OM Permit To Drill API Number: Permit Approval See cover letter for Number: • , • - 50 - 029 - 21968 - - Date: other reauirements Conditions of Approval: If box checked, well may not be used to explore for, test, or produce coalbed methane, gas hydrates, or gas contained shales: ❑ Samples Req'd: ❑ Yes ❑ No Mud Log Req'd: ❑ Yes ❑ No H Measures: ❑ Yes ❑ No Directional Survey Req'd: ❑ Yes ❑ No Other: APPROVED BY THE COMMISSION Date , COMMISSIONER Form 10-401 Revised 12/2005 , Submit In Duplicate • • 0 by January 27 2009 Tom Maunder Alaska Oil & Gas Conservation Commission 333 W. 7th Avenue, Suite 100 Anchorage, AK 99501 Re: Endicott 4- 04A/T -30 Permit to Drill Mr. Maunder: Well 4 -04A is currently scheduled to be drilled by Doyon 14 on about March 15, 2009. Well 4- 04/T-26 will be plugged and abandoned and used as the donor well as described in the Sundry Permit Application dated 1/20/2009. Please note that this spud date could be accelerated or delayed, depending on rig scheduling. Maximum anticipated surface pressure from the Kekiktuk with a full column of gas from TD to surface is 3,434 psi. We will be utilizing Doyon 14's 5000 psi four preventer stack (3 rams and an annular). The BOPs will be tested to 3500 psi. All wells passed the major risk classification with the exception 4- 04/T -26 at KOP. Please reference the attached 4- 04A/T -30 Drilling and Completion Plan Summary, directional plan, P & A, and proposed completion diagram. If you have any questions or require any additional information, please contact me at 564 -4195, or Dan Kara at 564 -5667. Sincerely, , ; Paul Ha son Drilling Engineer BPXA /ACT • � bp Well Name: 4- 04A/T -30 Endicott Kekiktuk Producer Drilling and Completion Plan Summary 1 Type of Well: 1Kekiktuk Producer Surface Location: 2,577' FSL and 845' FEL Section 8, T11N, R17E UM E = 270,191.90' N = 5,970,798.0' T1 - Near Top of Reservoir 3,723' FSL and 67' FEL 12,029' MD Section 7, T11N, R17E UM E = 265,724' N = 5,972,081' Z = - 9,893' TVDss At TD 12,451' TMD 3,723' FSL and 67' FEL Section 7, T11N, R17E UM E = 265,724' N = 5,972,081' Z = 10,315' TVDss Distance to Nearest Property Line 3763' from the Duck Island Unit Boundary Distance to Nearest Well in Pool 1700' from 4 -18. Nearby Wells 4- 02/Q -28 and 4- 06A/Q -30 AFE Number: 1 727632 Rig: 1 Doyon 14 Estimated Start Date: 1 3/26/2009 Rig days to complete: 1 25 MD: 1 12,451' 1Max Inc: 57 KOP: 1-8700' 1 KBE:143' Well Design: Sidetrack Producer - Window in Intermediate Casing Objective: Kekiktuk 1 • • Formation Markers: Formation Tops(TVDss) and Estimated Pore Pressures Estimated Depths Tops Hydrocarbon Estimated Bearing Formation TVDss TVDrkb MDrkb Y/N Pore Press. (Psi) (ppg) UG4 - Top Ugnu/West Sak -5950 5,993 7,125 No 0.44 8.5 KOP -6818 6,861 8,700 No 0.44 8.5 CM3 - Base Ugnu/Top Colville Shale -7217 7,260 9,301 No 0.45 8.7 Top Tuff Marker -8800 8,843 10,936 No 0.46 8.8 Top HRZ -9360 9,403 11,496 No 0.48 9.1 Base HRZ -9640 9,683 11,776 No 0.49 9.4 LCU / Top Itkilyariak LS -9640 9,683 11,776 No 0.49 9.4 Top Reservoir - FV -9893 9,936 12,029 Yes 0.18 -0.40 3.4 -7.5 FIV -9956 9,999 12,092 Yes 0.18 -0.40 3.4 -7.4 Fill -10041 10,084 12,177 Yes 0.18 -0.40 3.4 -7.5 FII -10098 10,141 12,234 Yes 0.18 -0.39 3.5 -7.5 Fl -10194 10,237 12,330 Yes 0.18 -0.39 3.5 -7.5 Original OWC -10195 10,238 12,331 No 0.18 -0.39 3.5 -7.5 3A4 (highest thin coals) -10256 10,299 12,392 Possible Tar 0.39 -0.43 7.6 -8.3 3A3 (possible thin coal) -10295 10,338 12,431 Possible Tar 0.40 -0.43 7.8 -8.3 TD 120' MD below OOWC -10315 10,358 12,451 Possible Tar 0.40 -0.43 7.6 -8.3 3A2 (30' coal) -10358 10,401 - Possible Tar 0.40 -0.43 7.6 -8.3 Evaluation Program: 8 -1/2" Section From KOP to Base HRZ Open Hole: DIR /GR/RES /PWD /NEU /DEN* I FR/CASAN DRA *Neutron /Density would be included only if the Team decides to implement a 1 -bit/1 -BHA to TD strategy. 8 -1/2" Section Base HRZ to TD Open Hole: DIR/GR/RES /PWD Neutron /Density IFR /CASANDRA Cased Hole: USIT of 9 -5/8" 2 • • Mud Program: 8 -1/2" Hole Section Glycol- Enhanced LSND Depth MD Mud Wt. PV YP API Fluid Los (ft) (lb /gal) (cP) (Ib /100ft (m1/30 min) pH MBT Milling -8,700' 9.1 16 -30 (m11�ng) < 8 cc 9.0 - 9.5 N/C 8,700 - 11,296' 9.1 -9.4 15 -22 22 -28 < 8 cc 9.0 -9.5 <10 11,296 - 12,451' 10.5 12 -20 18 -24 4.0 - 6.0 cc 9.0 -9.5 <15 New Casing/Tubing Program Hole Csg / Wt/Ft Grade Conn Length Top Bottom Size Tbg MD / TVD MD / TVD O.D. 30" Drive Pipe Welded GL 131' / 131' 17 -1/2" 13 -3/8" 68# L -80 BTC 2,500' 0' 2,500' / 2,496' 12 -1/4" 9 -5/8" 47# NT80HS/ NSCC 13,243' 0' 13,243' / 9,694 NT95HS 9 -5/8" Top of Window Section at 8,684' MD *. (16' -long window) *Actual position of window will depend on USIT results, etc. 8 -1/2" 7" 26# L -80 Hydril 521 2,751' 8,500'/6,757' 11,251'/9,159' Liner 7" 26# 13Cr -80 Hydril 521 1,200' 11,251'/9,159' 12,451'/10,358' „ Depth reflects 200' liner lap requested in SoR 8 -1/2" Contingency 7" 26# L -80 TCII 8,500' 0 8,500'/6,757' Tieback TBG 4 -1/2 12.6# 13Cr -80 VamTop 11,829' 0 11,829'/9,738' 3 • • Cement Program: Casing Size 7 ", 26 #, L- 80/13Cr -80, Hydril 521 Liner from 8,500 to 12,451' MD Lead: from 500' above the Kekiktuk (11,529') to liner top. Lead TOC: Top of liner, est. 8500' to achieve 200' liner lap Basis Tail: From TD (12,451') to 500' MD above the top of the Kekiktuk (TKEK = 12,029). 922' of open hole with 50% excess, plus 80' shoe track Tail TOC: 500' MD above TKEK. Total Cement Spacer 50 bbl of MudPush Volume: 265 bbl p Lead 111 bbls, 262 sks, 12.0 ppg Extended G Slurry - 2.38 cuft/sk Tail 34 bbls, 166 sks, 15.8 lb/gal Class G - 1.16 cuft/sk Temp BHST - 200 - 220° F at 10,000' TVDss From To Length Hole Casing Volume Excess Total Yield Total Size Size BBLs CuFt/sx Sacks Lead 200' 8300 8500 200 8.681 5 9.8 0.00% 9.8 2.36 23.3 above LT Lead to 8500 8700 200 8.681 7 5.1 0.00% 5.1 2.36 12.2 window (lap) Lead to 500' 8700 11529 2829 8.5 7 63.9 50.00% 95.8 2.36 228.0 above TKEK 11529 12451 922 8.5 7 20.8 50.00% 31.2 1.16 151.2 Tail 12371 12451 80 6.276 0 3.1 0.00% 3.1 1.16 14.8 Tail 102.69 145.05 TOTAL LEAD 110.75 bbl 263.5 sx TOTAL TAIL 34.30 bbl 166.0 sx Contingency Scab Liner Cement (Optional) TBD by results of USIT Casing Size 7 ", 26 #, L -80, TCII Tie -back from Surface to 8,500' MD Basis 15% Tail cement = -500' MD. Total Cement Spacer 50 bbl of MudPush Volume: 15 bbl p Tail 15 bbl, 71 sx "G" mixed at 15.8 lb/gal & 1.16 ft3 /sx Temp BHST 130 F at 6757' TVD 4 • . Well Control: Equipment will be installed that is capable of handling maximum potential surface pressures. (Schematics are on file with the AOGCC and MMS.) Independent gas and H2S detectors will be installed. ■ 5000 psi working pressure pipe rams (2) ■ Blind /shear rams ■ Annular preventer Based upon the calculations below, BOP equipment will be tested to 3500 psi. BOP regular test frequency will be 7 days, prior to milling the window and 14 days after milling the window, with a function test every 7 days. Production Section • Maximum anticipated BHP: 4,438 psi — Kekiktuk FIII (8.5* ppg @ 10,041' TVDss) • Maximum surface pressure: 3,434 psi — Based on a full column of gas @ 0.10 psi /ft • Planned BOP test pressure: 3,500 psi /250 psi Rams 2,500 psi /250 psi Annular • 7" Casing Test: 3,500 psi • Integrity Test — 8'h" hole: FIT to 11.5ppg EMW after milling window • Kick Tolerance: 121 bbls assuming 11.5 ppg EMW FIT at window, w/ 10.5 ppg mud • Planned completion fluid: 9.1 ppg NaCI brine, 200' of 6.8 ppg diesel • 8.5 ppg is at the high end of possible reservoir pressures expected. Disposal • No annular injection in this well. • Cuttings Handling: Cuttings generated from drilling operations will be hauled to grind and inject at DS -04. Any metal cuttings will be sent to the North Slope Borough. • Fluid Handling: Haul all drilling and completion fluids and other Class II wastes to DS -04 for injection. Haul all Class I waste to Pad 3 for disposal. 5 Drilling Hazards and Contingencies POST THIS NOTICE IN THE DOGHOUSE I. Well Control A. The Kekiktuk reservoir is assumed to be normal pressured at with a .44 psi /ft gradient (8.5 ppg EMW). There is a some pressure uncertainty with respect to this well due to concerns about the accuracy of static pressure data in END4 -06A (3.5 ppg EMW). The high estimate (8.5 ppg EMW) is based on virgin reservoir pressure in the zones below 10,299' TVD assuming they are not in communication with other wells. II. Stuck Pipe A. Endicott has a history of stuck pipe events both while drilling and running casing. Follow good hole cleaning, and tripping practices, as described in the END4 -04A Well Procedure. B. Minimize the time the drill string and casing are stationary across permeable zones to avoid differential sticking. Control API and HTHP fluid loss as recommended in the mud program. The 10.5 ppg mud could be as much as 4.0 ppg over reservoir pressure (The 3.5 ppg EMW is believed to be anomalous, with 6 -7 ppg EMW more representative of what is expected). III. Lost Circulation /Breathing A. Lost circulation is not expected. However, the Kekiktuk will be drilled 3 -4 ppg overbalanced. B. Well bore breathing may be encountered after weighting up the mud to drill the HRZ. There may be no cement outside of the window, thus there could be hydraulic communication to shallow permeable sands. An 11.5 ppg EMW FIT at the window at 8,700' MD/6,861' TVD is equivalent to 13.2 ppg EMW at the 13 -3/8" casing shoe. Previous LOT /FIT data indicate that rock strength at casing shoe should support this. Follow good hole cleaning practices, minimize ECDs, and minimize surge pressures to mitigate the chance of breathing. IV. Kick Tolerance /Integrity Testing Kick Tolerance / Integrity Testing Summary Table Casing set / Maximum Influx Mud Exp Pore Min LOT / FIT Interval Volume Weight Press Intermediate / 8'h" 121 bbls 10.5 8.5 (FV) 11.5 ppg FIT NOTE: All LOT / FIT will be taken with a minimum of 20 -ft and a maximum of 50 -ft of new hole drilled outside of the previous casing string (window in 9- 5/8 "). 6 0 • V. Hydrogen Sulfide SDI is an H site. Standard Operating Procedures for H should be followed at all times. Recent H data from the pad is as follows: Well name: Recent H2S (ppm) Date Highest H2s (ppm) Date 4 -02 200 8/16/08 300 12/09/06 4 -06a 65 8/11/08 420 7/16/08 4 -10a 0 9/13/08 450 6/12/08 4 -14A 100 9/16/08 190 8/08/08 4 -18 0 9/08/08 250 4/02/07 4 -20 240 9/07/08 300 6/15/08 4 -14A 100 9/16/08 190 8/08/08 4 -06A 65 9/10/08 420 7/16/08 VI. Faults No faults are expected to be crossed in END 4 -04A. No faults are expected in the reservoir section, although sub seismic faults with throws <25' may be encountered. CONSULT THE PAD DATA SHEET AND THE WELL PLAN FOR ADDITIONAL INFORMATION 7 • i DRILL & COMPLETION PROCEDURE Pre -Riq Operations - For Information Covered by Sundry Notice 1. Perform MIT /OA 2. PPPOT Tubing and Casing. (last done on 9/27/2008). 3. Function test casing and tubing LDS (last done on 9/27/2008). 4. Pull SSSV if installed, drift and tag fill and dummy off any live GLMs. 5. Perform injectivity test. Monitor and record IA and OA pressures during pumping operation. 6. Full -bore cement squeeze perforations with 15.8 ppg cement slurry. Final cement volume should be determined by injectivity test and PBTD. Minimum cement volume should be sufficient to cover perforations and bring cement to the tubing tail at 13,058' TMD - approximately 600 ft. above the uppermost perforation. Assuming a PBTD of 13999', this requires a minimum volume of 35 BBLS to fill the liner and tubing. Desired volume is 45 BBLS of cement slurry. (Squeeze 5 to 10 BBLS into perfs and leave excess cement in tubing). Cement calculations: a. With PBTD of 13,999' - Tubing tail at 13,058' : 35 bbls b. Barrels to squeeze behind pipe: 10.0 bbls Total cement volume : 45 bbls 7. Run wireline drift of tubing and tag TOC. CMIT tubing /IA. 8. Jet cut the tubing at -8,900' MD. 9. Circulate the tubing and IA to 9.1 ppg NaCI brine. Freeze protect tubing and IA to 200' with diesel. 10. Set BPV. 11. Remove gas lift and production flow lines, remove well house from END 4 -02, 4 -04, 4- 06 and 4 -08. Level the pad for Doyon 14. Drilling Riq: 1. MIRU Doyon 14. Circulate out diesel freeze protect through tubing cut. Install TWC. 2. ND Tree. NU and test BOPE. 3. Pull and LD 4'/2" tubing from pre -rig tubing cut. 4. w /Slickline, run GR/Junk Basket to +/- 8800' MD. 5. RU Eline. Run USIT log in corrosion mode to evaluate the condition of the 9 5/8" casing from -8,800' to surface. 6. RIH and set CIBP at ±8,750' (based on corrosion log and lithology). End of Sundry Notice Drilling Permit: 7. MU whipstock. RIH (on 4" drill pipe) and set whipstock, mill window (8,700'), and drill 20' of new formation. Perform FIT test. 8. MU 8'h" drilling assembly and directionally drill surface hole to an estimated total depth of 12,451' MD / 10,358' TVD. 8 9. Run and cement the 7 " #, Hyd 521, 13Cr / L -80 liner. • 10. If the USIT identifies concerns with the 9 -5/8" casing: • Run 7" 26# L -80 TCII tie -back and cement a minimum of 500'. Top of cement will be determined by USIT log. • MU cleanout BHA (w /4" drill pipe). Clean out 7" casing to PBTD. LD DP. 11. MU 4 -1 ", 12.6 #, 13Cr -80, Vam Top completion assembly and RIH. See completion schematic for details. Land tubing hanger and run in lockdown screws. 12. Reverse in brine with corrosion inhibitor to protect the annulus down to the packer. 13. Drop RHC ball and rod and set packer. Test tubing to 3,500 psi and annulus to 3,500 psi. Shear DCK valve. 14. Install two -way check and test to 1,000 psi from below. Nipple down the BOPE. Nipple up and test the tree to 5,000 psi. 15. Pull two -way check. Freeze protect the well to 200' TVD. 16. Install BPV. Secure the well. Rig down and move off. Post -Rig: 1. MIRU slickline. Pull the ball and rod / RHC plug. 2. Drift & Tag run to PBTD. 3. Pull out DCK shear valve and install GLV in all of the other mandrels. 4. Perforate well as determined from logs. 5. Put the well on production. 9 REF= CIW CTUATOR FMC , • ND4 - 04 P & A '�' CTUATOR = BAKER C • SAFE TES: ;T. ELEV = 54.70' F. ELEV = 16.25' P - - -._._ :OP = Diesel Freeze Protect to lax Angle = 58° © 8318' Iatum MD = 107 1545' 1 4-1/2" OTIS SSSN NIPPLE, ID = 3.813 " atum T VD = 10000' S_S w /SSSV MIN ID = 2.00" 13 -3/8" CSG, 68 #, L -80 BUTT, ID = 12.415" —I 2500' CIBP at —8750' ....... Jet cut at — 8900' 19-5/8" CSG, 47 #, NT8OHS XO TO NT95HS H 10957' I-->.< X Minimum ID = 3.725" @ 13046' 12938' — {4- 1 /2 " OTIS SLDSLV, ID =3.813" 4 -1/2" OTIS XN NIPPLE I I I I 4 -1/2" TBG, 12.6#, L -80 TDS, H 12958' ■ ■ 12958' --I4 -1/2" SEAL ASSY, ID = 4.00 .0152 bpf, ID = 3.958" 12973' — 19 -5/8" X ?" TAN HBBP PKR, ID = 4.00" ( ( ) 12977' - 15 -1/2" MILLOUT EXTENSION, ID = 4.778" 12982' — I5 -1/2" x 4 -1/2" XO, ID = 3.958" ' 13025' --I4 -1/2" OTIS X NIP, ID = 3.813 1 9 - 5/8" X 7" TM/ HYDRO HGR, ID =? N 13026' I — — II 1 13046' — I4 -1/2" OTIS XN NIP, ID = 3.725" 4 -1/2" TBG, 12.6#, L -80 TDS, —I 13058' / \ . 13058' 1— I4 -1/2" ■LEG, ID = 3.958' .0152 bpf, ID = 3.958" 13063' - - rELMD I.OGGED??1 19-5/8" CSG, 47 #, NT95HS NSCC, ID = 8.861" H 13243' 4 PERFORATION SUMMARY ( 13465' —I 7" MARKER JOINT I REF LOG: SOS CBT ON 09/18/89 l ANGLE AT TOP PERF: 43° @ 13677' J Note: Refer to Production DB for historical perf data J SIZE SPF INTERVAL Opn /Sqz DATE 15.8 J 3 -3/8" 4 13677 - 13700 0 11/08/89 Class G 3 -3/8" 4 13700 - 13720 0 11/08/89 3 -3/8" 4 13724 - 13728 0 11/08/89 3 -3/8" 2 13758 - 13807 0 11/08/89 3 -3/8" 4 13849 - 13883 0 11/08/89 3 -3/8" 4 13893 - 13926 0 11/08/89 1 1 PBTD H 13999' ,��,,,,. 7" LNR, 29 #, SM-110 TKC, .0371 bpf, ID = 6.184" H 14121' • - - - - - - - DATE REV BY COMMENTS DATE REV BY COMMENTS ENDICOTT UNIT 09/20/89 D15 COMPLETION WELL: 4 / T - 26 11/08/89 JLH/ PJC INITIAL PERFORATIONS PERMIT No: 1890860 03/03/08 KSB /PJC GLV C/O A PI No: 50 029 - 21968 - 00 1 03/12/08 ?/ PJC CONVERT TO NEW FORMAT SEC 8, T11 N, R17E, 2577' FSL & 845' FEL 03/13/08 KSB /TLH GLV C/O 05/08/08 JSA /ZMC/PJC DRAWING CORRECTIONS BP Exploration (Alaska) TRFF = CM/ WELLHEAD = FMC ACTUATOR= BAKERC ENDA4A Sidetrack SA NOTES: RT. ELEV = 5A 7 n' BF. ELEV = 16.25' KOP= Max Angle = 58° @ 8318' CD 4 - 1/2" HXO SSSV NIP, ID = 3.813" @ 1500' MD Datum MD = 10736' Datum TV D = 10000' SS I Contingency to bring 7" to surface w/ 'C398Y I ftx'124151- I #5 7" 26# L - TCII #4 J 95/8" x 7" Flex -Lock Hanger and ZXP Liner Top Packer at 8,500' MD 7" 26# L -80 Hydril 521 4 -1/2" 12.6# 13CR KGB -2 4.5" x 1" GLM @ VAM TOP #1 - 11800' MD #2 - 10900' MD #3 - 9700' MD #4- 7129'MD #5 - 3530' MD CIBP at -8750' Jet cut at - -8900' I I 4.5" X- nipple (3.813" ID) t>z] 4.5" x 7" S -3 Prod. Packer, 13Cr (11829 MD) I I @11809' MD 4.5" X- nipple (3.813" ID) at 11849' MD • 7" 26# 13CR I I 4.5" XN- nipple Hydril 521 (3.725" ID) @ 11869' MD • / WLEG (3.958 " ID) @ — 11889' MD 15.8 Class G PBTD — 12351' MD ►�� - - 'cry -• -• - TD at 12,451' MD, 10,358'TVD DATE REV BY COMMENTS DATE REV BY COMMENTS ENDICOTT UNIT 09/20/89 D15 COMPLETION WELL: 4-04A / T -30 11/08/89 JLH/ PJC INITIAL PERFORATIONS PERMfT No: 03/03/08 KSB /PJC GLV CJO API No: 50- 029 - 21968 -00 03/12/08 ?/ PJC CONVERT TO NEW FORMAT SEC 8, T11 N, R17E, 2577' FSL & 845 FEL 03/13/08 KSB/TLH GLV C/O 05/08/08 JSA/ZMCIPJC DRAWING CORRECTIONS BP Exploration (Alaska) COMPANY DETAILS REFERENCE INFORMATION SURVEY PROGRAM - - 0 BP Amoco Co- ordinate (N /E) Reference: Well Centre: 4- 04/T -26, True North epth Fm Depth To Survey /Plan Tool Plan: 04 - 04A Wp 6.0 shortened (4 - 04! 4 -04A Plan) t0li' bP Vertical (TVD) Reference: 14.5 t 28.5 GL 43.00 Iculation Method: Minimum Curvature Section (VS) Reference: Slot - 04 (0.00N,0.00E) 700.00 12451.27 Planned: 04 -04A Wp 6.0 shorten MWD:IFR I MS Created By: Sperry Drilling Date: 12/30/2008 Error System: ISCWSA Measured Depth Reference: 14.5 +28.5 GL 43.00 Scan Method: Tray Cylinder North Calculation Method: Minimum Curvature Error Surface: Elliptical l Casing WELL DETAILS CASING DETAILS Name + N / -S +E/-W Northing Easting Latitude Longitude Slot No TVD MD Name Size 4- 04/1-26 1413.00 - 2084.52 5970798.00 270191.19 70 °19'18.603N 147 °51'48.331W 04 1 10357.99 12451.26 7" 7.000 SECTION DETAILS Sec MD Inc Azi TVD +N / -S +E / -W DLeg TFace VSec Target HALLIBlJRTON 1 8700.00 57.26 287.18 6861.44 1128.54 - 3825.59 0.00 0.00 3985.72 2 8720.00 57.51 284.35 6872.22 1133.11 - 3841.80 12.00 -85.00 4002.56 3 9083.86 45.15 267.12 7100.18 1164.93 - 4121.64 5.00 - 137.73 4281.61 Sperry Drilling Services , 4 9148.22 45.15 267.12 7145.57 1162.63 - 4167.21 0.00 0.00 4325.21 - ......1111110 1111 ' 5 10051.27 0.00 140.00 7958.00 1145.65 - 4504.57 5.00 180.00 4647.97 •• 1111 • ■ 1 1 2451.27 0.00 140.00 10358.00 1145.65 - 4504.57 0.00 0.00 6 ' . -- : :1: I■ 6 1 ' ■•■ ■• • ■ ■ ■�® M■•■•M rev ! 6000 •••••••11111111 ‘11111•••••••••••111 , •■■ 1111•• •m■■■■■ ■ ■m•■■■■•■ ■�•• _ ' 1111 ® ■ ■ ■�. � ■■■ ■ ■ ■ ■ ■ ■ ■■ • ■•••■ ■ ■ ■ ■ ■ ■ ∎N ■ ■ ■ ■ ■ ■ ■ ■••1111111111•N• ® •• ■■■ ■ ■■■■• •■■•••••••••• • Stan Dir I . s7 0 � •••••••■• ••••••••�•• • ■ ■ ■•• ■�•••�.1•••••M• ' ••• ■ ■ ■ ■ ■ ■ ■�• ■ ■ ■ ■ ■ ■ ■•�•• . � •• [ ••••■•••• ■■ ■111•.0••••• MD' ■111.111■ ■ ■ ■ ■ ■ ■10.11■ ■ ■ ■ ■ ■ ■ ■ ■ ■ -■■11. . -` ■■• ■ ■•■••••••••■•■ ■■••• Start Dir 5 ° ,100' : 87'0' MD, 68 72.22 . TVD 1 ■.11.■ ■ ■ ■ ■ ■•111111111• ■ ■••■•■■INEMMII•• . MEM= ■■••■IIIIIM■MINIMI■■■■_■ ■ ■ ■0u ••■M■■■ ■ ■•11•••••••••••■•• . MIN1111111 ••••••••- ••••••••••■ \1 � End Di : 90 _ 5' M 1 u 9 7100.1 x' 0.22' MD, 71 <5.57 TVD ••••••••• ■ ■•••••• -�- _ ■ ■• ■ ■•�•�• ■ ■• ■ ■ ■ ■ ■ \ \• . D, 71 "ND • •• ■ ■ ■ ■ ■ ■ ■�• ■ ■ ■ ■ ■ ■ ■ ■�•• + 7ooc ■ •• ••••••�� ••••••••••••■.' •••••••■•• ••••••••�••■ 1111■■■■ �•■■•■■■■•■•■■ ■•■•■ ■�■■■ ■■■■■•■■•• ■■ ■■� ■■■■■■ •■■••■•■•■■■lLQ >: ■■■••■■■•■■■■■M_••• ■■•� • ■ ■•■■■ •■■• ■ ■ ■■ ■•■■ , ■■■■ MEMO ••••••••••••••••• ••••� •••• •••••••••••••• ■ ■•■ EMI 1111•x• ■ ■ ■ ■11■ ■ ■111MININI•• ■■■■ ■ ■ ■ ■ ■■ I ■ ■- ■� ■ ■I ■•� N ■ ■■ ■ ■ ■ ■■ _ 1111■■■ p11::: X11 =1111■■■■ 1• I 11C :1C1111111___ C ■■i■■ •■•••••••■■ I _ 10° _ Mill ■■ ■_�■■■■■■■■- RME■■■■_ c 11••••• •••••••••■■ . j_ • D Dir : '051.27' MD, 7958' TVD - ' 11 ■■■_ 11 . 11 ■• ■• 1111■- ••• ■ ■ ■■- MIME MIN •■■■■■■■ ■ ■■■MM•■■• ■•••■.11.1.11.1.■ ■• ■ ■ ■ ■1.1111.1.1 c 8000 [IMMENSE •• ■• ■ ■ ■ ■•• ■■ •' •• ••••�• ■ •••••••�•• SIIIMNII ■• ■ ■■ ••■•1111 ■ ■ ■ ■ ■ ■■ • 111=1•••••••••1111111••••••••••••111111E z .■■■■■■ •■■•■■■■■■••■ ■ ■ •■■■••■■■••r-- w- -mrlr =-a- -. mom g 11•••11■■ p •■ •. ■"■1111 ■ ■ ■ ■�•1 ii 11 it 1/. _ ■�l 1 Q 11111111•••• ■ ■■1,11111111""111111111•11,1111■ ■ ■■■■ ■ ■MNu lu 11 " J■ I _ VI rill 1111111•••• 11111••••••••••••••••••11•••••••••••• •1111111111•••••1111111 II a h II MI •il 1 MIES ■ •••••• • •■• •••••••••••• ■11 •••••••••••• •••••••■•w w...411" 1I 7 .U' * ,NI' MOM > ■■■11.11• •••••••••••••••• •11••••••••••• ■•••••••••••••••••••••■•••••• ■■•• '' ••••••• •■ ■••••••••••••• •11•••■•••••••• 'M■■■■■.•MMM•■••■■•• ■■IIIIMIIIIIIIM■■• E' 9000 Tti(f'E 1 -- ' tint =1�1�1�11�11 :11111 IV E11111111111111 1'11111 :111 - tte.�ttttt��ttttttttt �tt ��1111 �1��11:1111111 111111111111111111111 _ •�•••••••�•••••••••••�••• • � F • ■•••■••11■�••••••■■••• •■11••••••■■•• -- :�11�`511��1111111111_11 :1111 ■•• ■ ■� •■ ∎•■•• ■•• ■ ■■ ....11......... • ■ 111•11••••••1111•1111111111111••••••••••• =MI I••■•■ ■ ■ ■ ■ ■ 1-1111,,,.�111111111���1111 •••••••■••�•••• •••••• •••11••••••••••• . ■ •••■••••■\�■••■•••••••••••■•■■� ■••M ••� •••• ••■•••••• ••••11••••••••••• 9111111111101111111111111111 HEIM •■ ■•■ ■■ ■M - 1.1 • ■■ 10001 i/ t ••• ■■ •• ■■ ■ ■� ••■�•■■•■■■ - -, .■ 111 ••�••• ••••� ■ ■��• ■•• ■ ■ ■ ■ ■ ■ ■ ■■ ■it ■ ■ ■ ■• ■ X111 ■ ■ ■ ■ -_ - •� ■ ■• ■� All_ , Depth :•• _ ._' , I i'•4-(W � th 12451.27' MD, 1 I1 m • •••M • FORMATION TOP DETAILS (116.0 shortened 04/T -26 (4- 04/T -26 � 11 1.11 No. TVDPath MDPath Formation SUM 7„ T -30 1 rev I MB= MINI • 1111• _. •M ••• M■■ • - 1 • ■ ■■ ■ - - 1111 1 8918.00 11011.27 T Tuffs �_� 111 E1 1 ■1_ 1■ • ••1111• -r--- • •■ TARGET DETAILS 1 g : ::•••1 =1m1•m �••11� Name TVD +N / -S +E / -W Northing Easting Shape 100 6000 7000 8000 9000 10000 T -30 T1 9993.00 865.20 - 4678.07 5971806.00 265541.99 Point T -30 T1 rev I 10358.00 1145.65 - 4504.57 5972081.00 265723.99 Point Vertical Section at 284.27 °[1000ft/in] COMPANY DETAILS REFERENCE INFORMATION SURVEY PROGRAM BP Amoco ,-ordinate (N /E) Reference: Well Centre: 4 -04/T -26, True North Depth Fm Depth To Survey /Plan Tool Plan: 04 -04A Wp 6.0 shortened (4 -04/T- 26/04 -04A Plan) Vertical (TVD) Reference: 14.5 +28.5 GL 43.00 Calculation Method: Minimum Curvature Section (VS) Reference: Slot - 04 (0.00N,0.00E) 8700.00 12451.27 Planned: 04-04A Wp 6.0 shorten MWD +IFR +MS Created By: Sperry Drilling Date: 12/30/2008 Error System: ISCWSA deasured Depth Reference: 14.5 +28.5 GL 43.00 Scan Method: Tray Cylinder North Calculation Method: Minimum Curvature WELL DETAILS Error Surface: Elliptical + Casing Warning Method: Rules Based Name +N / -S +E/ -W Northing Fasting Latitude Longitude Slot HAL I BURTON + . f h -- h I y � I • ■■ ■ ■- 4- 04/T -26 1413.00 -208432 5970798.00 270191.19 70 °19'18.603N 147 °51'48.331W 04 Sperry Drilling Se rvices ' C■■■U■1U ■q■ TARGET DETAILS - ■ ■■ ■■■■■■■ •• ■11■ Name TVD +N / -S +E / -W Northing Fasting Shape 1344 1 ��� I IIII I 11 �� ■ ..� T -30 T1 9993.00 - t T -30 T1 rev 1 10358.00 1145.65 865.20 - 45 4678.07 04.57 5972081.00 5971806.00 265723.99 265541.99 Point •1• : 1 ■ 111 111 111 ■__ II � 1 � 11111 ®1 _ , I t •Viii • • _ n••• 1265 �. .1 ". ■■ _ 1 I_1 1 1 ' -_ -- - ■ : .1 , I IIIA� _ 1 � ii iiiii ®iN11n1 i _ 11 ••••■ ••••••• 1 ■� •� •q••••••••••11 ■11■■■■ ■ 11 ■■■■ ■■■■q■ - - _11 ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■■ 111•1111111111111•1111111111•11111111•••••••111 ■11 ■ ■ ■■ ■■■ ■ ■ ■ ■ ■ ■ ■■ 11111111111111111111111111111111111111111111 ' ■�■� ■q■■■■■■■■■ ■11■ ' •11•■■ ■M■■■■■■■ - 11• •■ ■ ■ ■ ■ ■ ■■ ■■�■�_ ■11 ■ ■ ■ ■ ■ ■ ■ ■q ■■ ■11■■ -"RUM -"RUM ••••••11111•1=1 ■ ••••••11111•1=1 ■ ■ ■ ■■ ■ ■ 1186 m..... •11 �II � INIA. 11111111 : = =N m..... 00o MIN= 1 - End Dir : 10051. MD, 7958' TVD �• mum c ■ ■ ■ ■� T -30 Tl re 1 ROE- ION + 7" c ! 00 1�110111111010110 11 �t • 7000 ■■■ Stan Dir 5° /1(10' :9148.22' MD, 7l VD NI q P 011111 04 -04A Plan 750 ; End Dir :9083.86 Nll, 7100.18 TVD 11011111••• 11011111••• 0 11 � 04-04A Wp 6.0 shorten:d ■q ■ ■ ■■ t ' .g - I t It it 5°,1 (10' : 8720' MC, 6872.22'TV D 1107 11111 1 1 . , •INIII� I' ■11 ■■ 1111111■11 , ` . \ ■/ ;� I IIIININN IININIII Start Dir 12°i100' : 8700' MD, 6861.44'TVD 11111••••• 1111111E11 I I. ■ ■ 1 ■ . 1 141 161N1NN111 ■■1 Imo- • ■ 41 * ■ II 1•0010101101111111•••111110•••••••11 ... 11 i 11 . 1111111■. .. ••... - ■ ■11•.. ■. ••• ••••••• ■1111 , : ► �r. ■ ■ ■ ■ ■ ■ ■ ■ ■■ . -- 1111 ■ ■ ■�■ ■■■ 102 ■ •■ ■ ••■ ■. :� � .■ _.q. HMI INN1 HI a , , - 11 • ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■■ -1 ■ ■■ IIII IIIN I NNII 1111111111111 11 � ■ ■ ■ ■ ■ ■ ■ ■ ■ ■■ 11 1111■■■ •■■1111■■■■ ■_�� ■ 1 ■1■ . ��� ■ ■ ■IN NIIII 1., CASING DETAILS 1. 11011•••• ■ • ■ ■ ■ ■■ = �11 ■■ 1 ! No. TVD MD Name Size MIME • •• ■ • ■ ■ ■ ■■ 11 •• j • ■ I 11901 ■ 1 ■■■.._ _ _ 1111 ■ 1 10357.99 12451.26 7" 7.000 1 ■ ■ 49 ill plui. II __ . -. ■ SECTION DETAILS ■ ■■ - - - Sec MD Inc Azi TVD +N / -S +E / -W DLeg TFace VSec Target ■■ _ _ .__ ■1 - 1 8700.00 57.26 287.18 6861.44 112834 - 3825.59 0.00 0.00 3985.72 • ■■ ■■■ ■ 1 ■ 2 8720.00 57.51 284.35 6872.22 1133.11 - 3841.80 12.00 -85.00 4002.56 IIi 11 - . -- ,_.. l� ■���� ? - -- 4 983.86 148.22 45.15 267.12 7145.57 1162.63 -4167.57 0.00 - 13 0.00 4325.21 IT -- 5 10051.27 0.00 140.00 7958.00 1145.65 -4504.57 5.00 180.00 4647.97 FORMATION TOP DETAILS I I 6 12451.27 0.00 140.00 10358.00 1145.65 -050437 0.00 0.00 4647.97 T -30 T1 rev 1 1111 111111111 11 I I No. TVDPath MDPath Formation - 4428 - 4349 -4270 - 4191 1 8918.00 11011.27 T Tuffs West(- )/East( +, • Sperry -Sun • BP Planning Report Company: BP Amoco Date: 12/30/2008 Time: 12:43:35 Page: 1 Field: Endicott Co- ordinate(NE) Reference: Well: 4 -04/T -26, True North Site: End SDI Vertical (TVD) Reference: 14.5 +28.5 GL 43.0 Well: 4- 04/T -26 Section (VS) Reference: Well (0.00N,0.00E,284.27Azi) Wellpath: 04-04A Plan Survey Calculation Method: Minimum Curvature Db: Oracle Plan: 04 -04A Wp 6.0 shortened Date Composed: 9/4/2008 Version: 10 Principal: Yes Tied -to: From: Definitive Path Field: Endicott North Slope UNITED STATES Map System: US State Plane Coordinate System 1927 Map Zone: Alaska, Zone 3 Geo Datum: NAD27 (Clarke 1866) Coordinate System: Well Centre Sys Datum: Mean Sea Level Geomagnetic Model: bggm2007 Site: End SDI TR -11 -17 UNITED STATES : North Slope Site Position: Northing: 5969322.46 ft Latitude: 70 19 4.709 N From: Map Easting: 272231.79 ft Longitude: 147 50 47.497 W Position Uncertainty: 0.00 ft North Reference: True Ground Level: 14.50 ft Grid Convergence: -1.74 deg Well: 4- 04/T -26 Slot Name: 04 4- 04/T -26 Well Position: +NI -S 1413.00 ft Northing 5970798.00 ft Latitude: 70 19 18.603 N +E / -W - 2084.52 ft Easting : 1 . - Longitude: 147 51 48.331 W Position Uncertainty: 0.00 ft Casing Points MD TVD Diameter Hole Size Name ft ft in in 12451.26 10357.99 7.000 8.500 7" Formations MD TVD Formations Lithology Dip Angle Dip Direction ft ft deg deg 11011.27 8918.00 T Tuffs 0.00 0.00 Targets Map Map < - -- Latitude ---> <- Longitude -> Name Description TVD +N / -S +E / -W Northing Easting Deg Min Sec Deg Min Sec Dip. Dir. ft ft ft ft ft T -30 T1 9993.00 865.20 - 4678.07 5971806.00 265541.99 70 19 27.098 N 147 54 4.872 W -Plan out by 329.78 at 9993.00 1145.65 - 4504.57 5972081.00 265723.99 70 19 29.857 N 147 53 59.813 W T - T1 rev 1 10358.00 1145.65 - 4504.57 5972081.00 265723.99 70 19 29.857 N 147 53 59.813 W -Plan hit target Plan Section Information MD lncl Azim TVD +N / -S +E / -W DLS Build Turn TFO Target ft deg deg ft ft ft deg /100ft deg/100ft deg /100ft deg 8700.00 57.26 287.18 6861.44 1128.54 - 3825.59 0.00 0.00 0.00 0.00 8720.00 57.51 284.35 6872.22 1133.11 - 3841.80 12.00 1.21 -14.17 -85.00 9083.86 45.15 267.12 7100.18 1164.93 - 4121.64 5.00 -3.39 -4.74 - 137.73 9148.22 45.15 267.12 7145.57 1162.63 - 4167.21 0.00 0.00 0.00 0.00 10051.27 0.00 140.00 7958.00 1145.65 - 4504.57 5.00 -5.00 0.00 180.00 12451.27 0.00 140.00 10358.00 1145.65 - 4504.57 0.00 0.00 0.00 0.00 T -30 T1 rev 1 S perry -Sun BP Planning Report Company: BP Amoco Date: 12/30/2008 Time: 12:43:35 Page: 2 Field: Endicott Co- ordinate(NE) Reference: Well: 4- 04/T -26, True North Site: End SDI Vertical (TVD) Reference: 14.5 +28.5 GL 43.0 Well: 4- 04/T -26 Section (VS) Reference: Well (0.00N,0.00E,284.27Azi) Wellpath: 04 -04A Plan Survey Calculation Method: Minimum Curvature Db: Oracle Survey MD Incl Azim TVD Sys TVD VS N/S E/W DLS MapN MapE Tool/Co nent ft deg deg ft ft ft ft ft deg/100ft ft ft 8700.00 57.26 287.18 6861.44 6818.44 3985.72 1128.54 - 3825.59 0.00 5972043.10 266402.11 Start Dir 1 . °M 8720.00 57.51 284.35 6872.22 6829.22 4002.56 1133.11 - 3841.80 12.00 5972048.17 266386.04 Start Dir 5° 1) 8800.00 54.59 281.05 6916.91 6873.91 4068.87 1147.73 - 3906.50 5.00 5972064.76 266321.82 MWD +IFR MS 8900.00 51.08 276.58 6977.33 6934.33 4148.16 1160.00 - 3985.19 5.00 5972079.44 266243.54 MWD +IFR MS 9000.00 47.76 271.65 7042.39 6999.39 4222.88 1165.53 - 4060.89 5.00 5972087.28 266168.06 MWD +IFR MS 9083.86 45.15 267.12 7100.18 7057.18 4281.61 1164.93 - 4121.64 5.00 5972088.54 266107.32 End Dir : •133 9100.00 45.15 267.12 7111.56 7068.56 4292.54 1164.35 - 4133.06 0.00 5972088.31 266095.88 MWD +IFR MS 9148.22 45.15 267.12 7145.57 7102.57 4325.21 1162.63 - 4167.21 0.00 5972087.64 266061.70 Start Dir 5° 13 9200.00 42.56 267.12 7182.90 7139.90 4359.49 1160.83 - 4203.04 5.00 5972086.94 266025.84 MWD +IFR MS 9300.00 37.56 267.12 7259.41 7216.41 4420.97 1157.60 - 4267.30 5.00 5972085.67 265961.51 MWD +IFR MS 9400.00 32.56 267.12 7341.23 7298.23 4475.84 1154.71 - 4324.65 5.00 5972084.54 265904.09 MWD +IFR S 9500.00 27.56 267.12 7427.75 7384.75 4523.70 1152.19 - 4374.67 5.00 5972083.56 265854.03 MWD +IFR MS 9600.00 22.56 267.12 7518.31 7475.31 4564.16 1150.06 - 4416.97 5.00 5972082.72 265811.69 MWD +IFR MS 9700.00 17.56 267.12 7612.21 7569.21 4596.93 1148.34 - 4451.22 5.00 5972082.05 265777.40 MWD +IFR MS 9800.00 12.56 267.12 7708.74 7665.74 4621.76 1147.03 - 4477.17 5.00 5972081.54 265751.43 MWD +IFR MS 9900.00 7.56 267.12 7807.17 7764.17 4638.45 1146.16 - 4494.61 5.00 5972081.20 265733.96 MWD +IFR f 1 10000.00 2.56 267.12 7906.75 7863.75 4646.88 1145.71 - 4503.42 5.00 5972081.02 265725.14 MWD +IFR ry1S 10051.27 0.00 140.00 7958.00 7915.00 4647.97 1145.65 - 4504.57 5.00 5972081.00 265723.99 End Dir : 11 )5 10100.00 0.00 140.00 8006.73 7963.73 4647.97 1145.65 - 4504.57 0.00 5972081.00 265723.99 MWD +IFR MS 10200.00 0.00 140.00 8106.73 8063.73 4647.97 1145.65 - 4504.57 0.00 5972081.00 265723.99 MWD +IFR MS 10300.00 0.00 140.00 8206.73 8163.73 4647.97 1145.65 - 4504.57 0.00 5972081.00 265723.99 MWD +IFR MS 10400.00 0.00 140.00 8306.73 8263.73 4647.97 1145.65 - 4504.57 0.00 5972081.00 265723.99 MWD +IFR MS 10500.00 0.00 140.00 8406.73 8363.73 4647.97 1145.65 - 4504.57 0.00 5972081.00 265723.99 MWD +IFR MS 10600.00 0.00 140.00 8506.73 8463.73 4647.97 1145.65 - 4504.57 0.00 5972081.00 265723.99 MWD +IFR MS 10700.00 0.00 140.00 8606.73 8563.73 4647.97 1145.65 - 4504.57 0.00 5972081.00 265723.99 MWD +IFR MS 10800.00 0.00 140.00 8706.73 8663.73 4647.97 1145.65 - 4504.57 0.00 5972081.00 265723.99 MWD +IFR MS 10900.00 0.00 140.00 8806.73 8763.73 4647.97 1145.65 - 4504.57 0.00 5972081.00 265723.99 MWD +IFR MS 11000.00 0.00 140.00 8906.73 8863.73 4647.97 1145.65 - 4504.57 0.00 5972081.00 265723.99 MWD +IFR MS 11011.27 0.00 140.00 8918.00 8875.00 4647.97 1145.65 - 4504.57 0.00 5972081.00 265723.99 T Tuffs 11100.00 0.00 140.00 9006.73 8963.73 4647.97 1145.65 - 4504.57 0.00 5972081.00 265723.99 MWD +IFR MS 11200.00 0.00 140.00 9106.73 9063.73 4647.97 1145.65 - 4504.57 0.00 5972081.00 265723.99 MWD +IFR MS 11300.00 0.00 140.00 9206.73 9163.73 4647.97 1145.65 - 4504.57 0.00 5972081.00 265723.99 MWD +IFR MS 11400.00 0.00 140.00 9306.73 9263.73 4647.97 1145.65 - 4504.57 0.00 5972081.00 265723.99 MWD +IFR ris 11500.00 0.00 140.00 9406.73 9363.73 4647.97 1145.65 - 4504.57 0.00 5972081.00 265723.99 MWD +IFR MS 11600.00 0.00 140.00 9506.73 9463.73 4647.97 1145.65 - 4504.57 0.00 5972081.00 265723.99 MWD +IFR MS 11700.00 0.00 140.00 9606.73 9563.73 4647.97 1145.65 - 4504.57 0.00 5972081.00 265723.99 MWD +IFR MS 11800.00 0.00 140.00 9706.73 9663.73 4647.97 1145.65 - 4504.57 0.00 5972081.00 265723.99 MWD +IFR MS 11900.00 0.00 140.00 9806.73 9763.73 4647.97 1145.65 - 4504.57 0.00 5972081.00 265723.99 MWD +IFR MS 12000.00 0.00 140.00 9906.73 9863.73 4647.97 1145.65 - 4504.57 0.00 5972081.00 265723.99 MWD +IFR MS 12086.27 0.00 140.00 9993.00 9950.00 4647.97 1145.65 - 4504.57 0.00 5972081.00 265723.99 T -30 T1 12100.00 0.00 140.00 10006.73 9963.73 4647.97 1145.65 - 4504.57 0.00 5972081.00 265723.99 MWD +IFR MS 12200.00 0.00 140.00 10106.73 10063.73 4647.97 1145.65 - 4504.57 0.00 5972081.00 265723.99 MWD +IFR f 1 12300.00 0.00 140.00 10206.73 10163.73 4647.97 1145.65 - 4504.57 0.00 5972081.00 265723.99 MWD +IFR MS 12400.00 0.00 140.00 10306.73 10263.73 4647.97 1145.65 - 4504.57 0.00 5972081.00 265723.99 MWD +IFR MS 12451.27 0.00 140.00 10358.00 10315.00 4647.97 1145.65 - 4504.57 0.00 5972081.00 265723.99 T -30 T1 re ' • -...■ WELL DETAILS ANTI SETTINGS COMPANY DETAILS SURVEY PROGRAM Name *N/-S +E/AV Northing Searing Latitude Longitude Slot . Amoco Depth Fm Depth To Survey/Plan Tool Iperpolaton MethodMD Interval: 25.00 4-04/1.26 1413.00 -2084.52 5970798.00 270191.19 701918.603N 147 04 I epth Range From: 8700.00 To: 12451.27 Calculation Method: Minimum Curvature 8700.00 1245127 Planned: 04-04A Wp 6.0 shorten MWD-HFR- MS Error System: 1SCWSA Maximum Range: 1442.28 Reference: Plan: 04 Wp 6.0 shortened Scan Method: Tray Cylinder North Error Surfacer Elhpfical T Casing Warning Method: Rules Based 0 WELLPATH DETAILS 160 arrACC 36) . w.M.V4./Nr Aar , v .3 Ant tf4.1.1:Ati. From Colour To MD 0 - 250 04-04A Plan Parent Wellpath: 4-04 150 250 - - on ma 4-26 0 - 500 Tie 8700 00 14°"-- -4"1"-49-41.441,1, O 500 750 Ref. Datum: 14.5+28.5 GL 43.00ft 750 1000 -.T. AAPIIIPAr0440:01S 1000 - 1250 v. s ' ' ' ' ' 125 - -4 4 ajlr " 1 ri'Vrill P A 111fr.VAL 1250 - 1500 284.27° 0.00 0.00 28.50 ' '4°;'' " liP(/' ,... it, 1500 - 1750 1750 - 2000 2000 - 2250 .4,,, LEGEND .6. 2250 - 2500 100 ..... .,,,,,,,,, ...., opp... 1 .. . 4 2500 • 2750 to S me. 3-19/R-28 (03.19A Plan). Major Risk srshraaa 3-23/N-32 (03-23A Plan), Major Risk 2750 - 3000 - 4-04/T-26 (4-04/F.26). NOERRORS ". ". %■ jj 14411 .■[ , 4, ,, , _ 4IF . i l l , V ro cll.* t 3000 7 3250 = 4-08/P-27 (Plan 04-08A), Major Risk ■• 4-26/0-34 (Plim 04-26A), or Maj Risk i S rrilitrVr -4' Alli4if!l■ 1%;,,7 n 3250 - 500 - 04-04A Plan ....■ 04.04A Wp .0 shot 3 I 1 .•;11/ AgO . '''--, 4 1/Ap,* 4 ,1 1 ,;1■A Aviv, - 3500 • 3750 1 r.,....„,,, 3750 4000 75 -.4. 4" . __ -Ai. #0 A#A 0:. -or ;-.- - 4 ,: i r Aii . ,,,,40„AA; w ow - 4250 III Li Att Z,141 ;4&„,,,,ildfrAVA.AVAVAIR i 4250 - 3 6 4500 1 'rm.- ..".0" • Alp 4 14r 42 ..0 wArA a t.- - - 500 - 4750 ,,/, _ .,..„„, A•orr m-, / Mili i' -...,.. -- , r1,4. - ' :,' All'AVAIWAW/MliktitiyAipt; 1 4 50 - 5000 0 ,■. a O'l ,- ' " It bag 1 F Baal 41f - A - -." 4 Nig ii, r =id d ." AFIT",- ... ,i4 1110ko - ssoo - - 25 f - i 'IP Week% 0 4 W4IP - -:-4Avarosraspv, * ;4,40,0,4 1 -iiing--- ituillI n idi rr '16.4 drary41704i *4,10 % 110111. :.....1 .11■14. Attif ■.. 0 270., .... a .........„ ,, _............... 1 7 _,.....„,■......... qr4 iir ... -- -1/111pliFIV IIIIIIIIIIIMIN4111111,,,, _ 4r oiri p , b , _ , A i I _ k A 41 111irr 110 190 111111Lft11111100 411 0. 4 eliAr4747/0','kigtb.. 4 40 .4 iklOACOI 8 " 000 t - 25 111101 snug.* - -4'4,41 ...., . A 4,41110 40 ,0, A r la 11110,1 i-f,„,01 It • v ■. , t A AI. .__. z- ,„„v__ lirlIPAI'Vrdar, a a.".. A Illio■Alleljigioik Al AW . . ; ! :ii. ....: OW, .1■-as'is -- fa<-4 , 41r,,.,Ari - 7* 74/4 Alt' 40. ■Pg.-- r :' awl: - 4 i'N■ SU I I ii ", ira:AWAR041W; , kil 01 ,,*. .-,_!. •••■IFIRACIZ:treki V i g4:* -- - 50 lova Z/ P2-. ':, -.:.- - r' -- . z , , r N ...,_,v7.0.-..-.....--.4...---..,,Atoo,.....,...., , .„,!..: ... ,.,..v ..._ , __ .. .. _.......„...„.--.-.....„).------,--;*;,-.,1r........-„,:4.-,.. "It. iN A e 2.41p . . 4 4 4 . svyAr 4 , , , : ,swi 20 - 75 '-:-...,--1-",,:-'--,■-...•■f•-•11=4,.."---i--3_-:...7:_lf--44114,1004014,0.,z. 41 • N A 246 "Wlat■,41 A . tW , 4 , At# i , o70- . 7 : 1 0. 0- .0 7 . - i - ,4 ,-,9 :4i. 1 % ,- 4:sr•z" - '1%;%:_., .7......7r.....7,41,.-1:,...,r4,...; - ,.......,-....■,t, --..... - - - - - ; ' ° ' P 4. ±. k * *, .11 / 6 #8 ; 00 4 \1 ..s........-4,1 _ , ,ff ii, , ,, -- ...„, ::„..,-;-,-._.,,,.... ...,...,,,,„,", v w , 4 • ‘i, ...d , ....,...4.,,,.... ■: -100 -vilds, -.■,-. At . >•■•1117!..4 • s,;. , - •40' .. " 4 - -. ' • ,414 •._-;`;7■74.1 Pre Plans Removed. . o va.. 'It...A, t... ; ir- .. ... . vivlieljoi. -iv- . -,... -.• ... ... 1.4.4-( See AC Scan for Plans ,...-4),, :440 -.,. N,•,:... ..- .-- . . -• ...- "' 411 i' i . 1 1, 411 °. ./4k* '‘,"-.‘- '■'8 i ‘N.-..10\ Av■ A . verb ,, ...ir ;41F‘ A■0- ...■• ■ .%.°4.;•100' ■ !• ' \ * . •■ - '4 0 ' 4 : , ' ' ..!..10,',4t1704 .411v 4A. '■,t Parents Profile @ No Errors - 125 A . 9 -8 .-0,0`■ ,, /,v4P , .-. •ow,*•, N■. At" -4. 44`. ■.-* .‘ • . ::•/11, A■VA a -, jo' zi vAL ro -.?.. •. ■ : ..■,,, v 0: A ks. . s* . w 4, 4 4 4■, i f. W 0 -*4.'MPAW#.' , C4 ', 1,& ■,,,- 4& - '4■"/ ' e ■,..0 8720 MD SECTION DETAILS 4 *:IiIiikAl1P1 4 1`:'q*. 401 0 &..ts-r, .4 S. Inc Azi TVD DLeg TFace VS. Target -4- • 2 1 'Alezek ,t,y IF,„•. ,,f.p.. 50 1 8700 57 2 -150 .00 6 287.18 6861.44 1128.54 -3825.59 0 00 0.00 3985.72 '. P, I i ' kif?rid. 4, 41,4. - 1 * % 2 .00 57.51 28435 6872.22 1133.11 -3841.80 12.011 -85.00 4002.56 3 9083.86 45.15 267.12 7100.18 1164.93 .4121.64 5 00 -137 73 4281.61 1WA■ A.' 4 0 ,, Ai ,..- ,:lvt. 4ti • •■■••■,,, , , 5 . ,: i : ii•ei , .,\- , ..44/ „. 4• 4 0 . 140.00 4 9148 22 45.15 267.12 7145.57 1162.63 -416711 0.00 0.00 4325.21 5 10051.27 0.00 140. 7958.00 1145.65 -4504.57 5.00 10000 4647.97 i 6 12451.27 0.00 140.00 10358.00 1145.65 -4504.57 0.00 0.00 4647.97 T-30 T1 rev 1 -160 io I 1 81 ... ...e• - ■_ . --", -1- - 7- -u." 7 D RAFing ylinde h (T JAZ1) [deg] vs CKtt to Cenne SI:L rft/in] .: • Sperry -Sun • Anticollision Report Company: BP Amoco Date: 12/30/2008 Time: 12:44:02 Page: 1 Field: Endicott Reference Site: End SDI Co- ordinate(NE) Reference: Well: 4 -04/T -26, True North Reference Well: 4- 04/T -26 Vertical (TVD) Reference: 14.5 +28.5 GL 43.0 Reference Wellpath: 04-04A Plan Db: Oracle GLOBAL SCAN APPLIED: All wellpaths within 200'+ 100 /1000 of reference - There are Tt Wk wodls in this f12td1cipal Plan & PLANNED PROGRAM Interpolation Method: MD Interval: 100.00 ft Error Model: ISCWSA Ellipse Depth Range: 28.50 to 12451.27 ft Scan Method: Tray Cylinder North Maximum Radius: 1442.28 ft Error Surface: Ellipse + Casing Survey Program for Definitive Wellpath Date: 9/4/2008 Validated: No Version: 0 Planned From To Survey Toolcode Tool Name ft ft 31.35 8700.00 1 : Schlumberger GCT multishot (31.35- 1416fI4l) -03S Schlumberger GCT multishot 8700.00 12451.27 Planned: 04 -04A Wp 6.0 shortened V10 MWD +IFR +MS MWD + IFR + Multi Station Casing Points MD TVD Diameter Hole Size Name ft ft in in 12451.26 10357.99 7.000 8.500 7' Summary <---------- ---- -- Offset Wellpath ----------- - - - - -> Reference Offset Ctr -Ctr No-Go Allowable Site Well Wellpath MD MD Distance Area Deviation Warning ft ft ft ft ft End SDI 3- 19/R -28 03 -19A Plan VO Plan: 0 11848.73 12200.00 162.34 314.79 - 152.45 FAIL: Major Risk End SDI 3- 23/N -32 03 -23A Plan VO Plan: 0 11853.97 12500.00 252.53 197.57 54.96 Pass: Major Risk End SDI 4- 04/T -26 4- 04/T -26 V1 8688.30 8700.00 0.00 0.65 -0.65 FAIL: NOERRORS End SDI 4- 08/P -27 Plan 04 -08A VO Plan: 0 11712.14 12200.00 136.52 156.74 -20.21 FAIL: Major Risk End SDI 4- 26/0 -34 Plan 04 -26A VO Plan: 0 11922.74 12100.00 301.39 214.14 87.25 Pass: Major Risk Site: End SDI Well: 3- 19/R -28 Rule Assigned: Major Risk Wellpath: 03 -19A Plan VO Plan: 03 -19A Wp 3.0 V6 Inter -Site Error: 0.00 ft Reference Offset Semi -Major Axis Ctr -Ctr No -Go Allowable MD TVD MD TVD Ref Offset TFO+AZI TFO -HS Casing/HSDistance Area Deviation Warning ft ft ft ft ft ft deg deg in ft ft ft 28.50 28.50 28.50 28.50 0.00 0.00 17.63 17.63 4.500 186.63 0.54 186.09 Pass 98.21 98.21 100.00 100.00 0.18 0.04 17.65 167.61 4.500 187.33 1.89 185.43 Pass 199.08 199.07 200.00 200.00 0.26 0.11 17.59 177.34 4.500 188.86 3.34 185.52 Pass 299.49 299.48 300.00 299.99 0.45 0.17 17.38 187.82 4.500 190.53 5.06 185.46 Pass 400.00 399.99 400.00 399.96 0.74 0.23 17.11 81.89 4.500 192.57 7.14 185.43 Pass 501.03 501.02 500.00 499.92 0.86 0.29 16.60 303.02 4.500 194.07 8.67 185.41 Pass 588.57 588.50 600.00 599.86 0.56 0.35 15.73 198.31 4.500 199.78 8.85 190.94 Pass 681.62 681.26 700.00 699.75 0.41 0.49 14.72 188.84 4.500 211.71 9.69 202.02 Pass 779.73 778.96 800.00 799.49 0.58 0.63 13.59 187.53 4.500 227.05 11.55 215.50 Pass 879.61 878.46 900.00 898.89 0.72 0.80 12.08 187.20 4.500 245.18 13.32 231.86 Pass 977.16 975.66 1000.00 997.92 0.96 0.99 10.00 185.71 4.500 264.57 15.37 249.19 Pass 1073.76 1071.91 1100.00 1096.51 1.05 1.20 7.63 183.48 4.500 285.71 16.97 268.74 Pass 1170.79 1168.57 1200.00 1195.01 1.24 1.42 5.37 181.32 4.500 307.24 18.87 288.37 Pass 1268.55 1265.99 1300.00 1293.53 1.36 1.59 3.40 179.54 4.500 328.78 20.43 308.35 Pass 1366.46 1363.55 1400.00 1392.20 1.55 1.69 1.75 178.82 4.500 349.84 21.96 327.88 Pass 1464.46 1461.23 1500.00 1490.89 1.84 1.87 0.31 178.42 4.500 371.05 23.99 347.06 Pass 1565.74 1562.21 1600.00 1589.51 2.15 2.09 358.95 178.23 4.500 392.28 26.26 366.02 Pass 1671.72 1668.01 1700.00 1688.03 2.39 2.31 357.73 171.85 4.500 412.55 28.35 384.20 Pass 1776.76 1772.97 1800.00 1786.34 2.72 2.57 356.71 165.59 4.500 432.59 30.80 401.79 Pass 1876.50 1872.67 1900.00 1884.25 3.13 2.87 355.50 166.41 4.500 453.09 33.45 419.64 Pass 1978.38 1974.52 2000.00 1981.78 3.51 3.16 354.02 165.17 4.500 473.32 36.03 437.28 Pass 2075.01 2071.14 2100.00 2078.96 3.46 3.48 352.32 164.97 4.500 493.23 37.27 455.96 Pass 2174.60 2170.72 2200.00 2175.50 3.80 3.84 350.42 159.60 4.500 514.24 39.88 474.36 Pass 2271.20 2267.32 2300.00 2271.14 4.08 4.27 348.35 165.73 4.500 536.85 42.34 494.51 Pass 2365.71 2361.82 2400.00 2365.78 4.13 4.75 346.17 149.33 4.500 561.83 44.14 517.69 Pass 2459.03 2455.14 2500.00 2459.31 4.37 5.27 343.93 162.87 4.500 589.56 46.51 543.05 Pass Alaska Department of Natural Resources Land Administration System Page 1 off 1 s r Land RecerdstStatus Plats Recorder's Search State Cabins Natural Resources Alaska DNR Case Summary File Type: ADL File Number: 47502 a Printable Case File Summary See Township, Range, Section and Acreage? C: Yes r No o New Search LAS Menu 1 Case Abstract 1 Case Detail 1 Land Abstract File: ADL 47502 a mak' Search for Status Plat Updates As of 02/06/2009 Customer.: 000106901 UNION OIL COMPANY OF CALIFORNIA PO BOX 196247 ATTN: LAND MANAGER ANCHORAGE AK 995196247 Case Type: 784 OIL & GAS LEASE COMP DNR Unit: 780 OIL AND GAS File Location: DOG DIV OIL AND GAS Case Status: 35 ISSUED Status Date: 09/30/1969 Total Acres: 2469.000 Date Initiated: 08/11/1969 Office of Primary Responsibility: DOG DIV OIL AND GAS Last Transaction Date: 08/16/2007 Case Subtype: NS NORTH SLOPE Last Transaction: DR DOCUMENT RECORDED Meridian: U Township: 011N Range: 017E Section: 05 Section Acres: 640 Search Plats Meridian: U Township: O11N Range: 017E Section: 06 Section Acres: 593 Meridian: U Township: 011N Range: 017E Section: 07 Section Acres: 596 Meridian: U Township: 011N Range: 017E Section: 08 Section Acres: 640 Legal Description 08 -11 -1969 ***SALE NOTICE LEGAL DESCRIPTION* * * C23 -087 TIIN- RI7E -UM GENERAL 05 640.00 ALL 06 593.00 ALL 07 596.00 ALL 08 640.00 ALL TOTAL ACRES - 2469.00 End of Case Summary http: / /dnr.alaska.gov /proj ects /las/ Case_ Summary.cfm ?FileType = ADL &FileNumber = 47502... 2/6/2009 TRANSMITTAL LETTER CHECKLIST WELL NAME e 4 01, 7 .-570 PTD# o'O90/9 ,/ Development Service Exploratory Stratigraphic Test Non - Conventional Well • FIELD: e/1/4 /C'1377 POOL: 6 /CO77 •/Z. Circle Appropriate Letter / Paragraphs to be Included in Transmittal Letter CHECK ADD -ONS WHAT (OPTIONS) TEXT FOR APPROVAL LETTER APPLIES MULTI LATERAL The permit is for a new wellbore segment of existing well (If last two digits in Permit No. , API No. 50- - - API number are between 60 -69) Production should continue to be reported as a function of the original API number stated above. PILOT HOLE In accordance with 20 AAC 25.005(0, all records, data and logs acquired for the pilot hole must be clearly differentiated in both well name ( PH) and API number (50- - - ) from records, data and logs acquired for well SPACING The permit is approved subject to full compliance with 20 AAC EXCEPTION 25.055. Approval to perforate and produce / inject is contingent upon issuance of a conservation order approving a spacing exception. assumes the liability of any protest to the spacing exception that may occur. DRY DITCH All dry ditch sample sets submitted to the Commission must be in SAMPLE no greater than 30' sample intervals from below the permafrost or from where samples are first caught and 10' sample intervals through target zones. Non - Conventional Please note the following special condition of this permit: Well production or production testing of coal bed methane is not allowed for (name of well) until after (Company Name) has designed and implemented a water well testing program to provide baseline data on water quality and quantity. (Company Name) must contact the Commission to obtain advance approval of such water well testing program. Rev: 1/11/2008 WELL pottiar CHECKLIST Field & Pool ENDICOTT, ENDICOTT OIL - 220100 Well Name: _DUCK IS UNIT SDI 4- 04A/T26 Program DEV _ Well bore seg ❑ PTD#: 2090190 Company BP EXPLORATION.. ALASKA) INC Initial Class/Type DEV / PEND GeoArea 890 Unit 10450 On /Off Shore Off Annular Disposal ❑ Administration 1 Permit fee attached NA 2 Lease number appropriate Yes 13 Unique well name and number Yes 4 Well located in a defined pool Yes 5 Well located proper distance from drilling unit boundary Yes 6 Well located proper distance from other wells Yes 7 Sufficient acreage available in drilling unit Yes 8 If deviated, is wellbore plat included Yes 9 Operator only affected party Yes 10 Operator has appropriate bond in force Yes Blanket Bond # 6194193. 11 Permit can be issued without conservation order Yes Appr Date 12 Permit can be issued without administrative approval Yes 13 Can permit be approved before 15 -day wait Yes ACS 2/6/2009 14 Well located within area and strata authorized by Injection Order # (put IO# in comments) (For NA ,15 All wells within 1/4 mile area of review identified (For service well only) NA • 116 Pre - produced injector: duration of pre - production less than 3 months (For service well only) NA 17 Nonconven. gas conforms to AS31.05.030(j.1.A),(j.2.A -D) NA 18 Conductor string provided NA Conductor set in 4- 04/T -26 (189 -086). Engineering 19 Surface casing_protects all known USDWs NA AIO 1, Finding 4 states, "Injection into, through or above a fresh water aquifer or USDW will not occur." !20 CMT vol adequate to circulate on conductor & surf csg NA Surface casing set in 4- 04/T -26. 21 CMT vol adequate to tie -in long string to surf csg NA Production casing set in 4- 04/T -26. New production liner will be fully cemented. 22 CMT will cover all known productive horizons Yes 23 Casing designs adequate for C, T, B & permafrost Yes 24 Adequate tankage or reserve pit Yes Rig equipped with steel pits. No reserve pit planned. All waste to approved disposal well(s). 25 If a re- drill, has a 10 -403 for abandonment been approved Yes 309 -020 26 Adequate wellbore separation proposed Yes Proximity analysis performed. Traveling cylinder path calculated. Close approach in zone. 27 If diverter required, does it meet regulations NA BOP stack will already be in place. Appr Date 28 Drilling fluid program schematic & equip list adequate Yes Maximum expected formation pressure 8.5 EMW. Planned MW up to 10.5 ppg TEM 2/11/2009 29 BOPEs, do they meet regulation Yes &/11/1 30 BOPE press rating appropriate; test to (put psig in comments) Yes MASP calculated at 3434 psi. 3500 psi BOP test planned. 31 Choke manifold complies w /API RP -53 (May 84) Yes 132 Work will occur without operation shutdown Yes 33 Is presence of H2S gas probable Yes H2S is reported at Endicott. Mud should preclude H2S on rig. Rig has sensors and alarms. 34 Mechanical condition of wells within AOR verified (For service well only) NA 35 Permit can be issued w/o hydrogen sulfide measures No Max level H2S on pad420ppm on well 4 -06A (7/16/08). Geology 36 Data presented on potential overpressure zones NA Appr Date 37 Seismic analysis of shallow gas zones NA ACS 2/6/2009 38 Seabed condition survey (if off- shore) NA 39 Contact name /phone for weekly progress reports [exploratory only] Yes Paul Hanson - 564 -4195. Geologic Engineering P •lic Commissioner: Date: Commissioner: Date o ' ner Date pi a —ft—©t