Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout188-014Image Project Well History File Cover Page XHVZE This page identifies those items that were not scanned during the initial production scanning. They are available in the original file, may be scanned during the rescan activity or are viewable by direct inspection of the file. Well History File Identifier ' · Organization (done) ~'~Wo-sided RESCAN DIGITAL DATA OVERSIZED (Scannable) Color items: D Diskettes, No. [] Maps: [] GraYscale items: D Poor Quality Originals: [] Other: TOTAL PAGES: /~',.~ Other, No/Type [] NOTES: Other items scannable by large scanner OVERSIZED (Non-Scannable) [] Logs of various kinds ~'0ther ORGANIZED BY: BEVERLY BREN VINCENT SHERYL MARIA LOWELL DATE: Is~ Project Proofing [] Staff Proof By: Date. PROOFED BY: BEVERLY BREN VINCENT SHERYL MARIA LOWELL DATE: Is~ PAGES: /.~A(at the time of scanning) SCANNED BY~ BEVERLY BREN VINCE~MARIA LOWELL ReScanned (done) RESCANNED BY:~ BREN VINCENT SHERYL MARIA LOWELL /si General Notes or Comments about this file: Quality Checked (done) Rev 1NOTScanned.wpd . STATE OF ALASKA a ALASKAleIL AND GAS CONSERVATION COM~SION WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1a. Well Status: D Oil DGas D Plugged 181 Abandoned D Suspended DWAG 1 b. Well Class: 20AAC 25.105 20AAC 25.110 181 Development D Exploratory DGINJ DWINJ D WDSPL No. of Completions Zero Other D Stratigraphic D Service 2. Operator Name: 5. Date Comp., Susp., or Aband. 12. Permit to Drill Number BP Exploration (Alaska) Inc. 9/13/2005 1sa..014 305-245 3. Address: 6. Date Spudded 13. API Number P.O. Box 196612, Anchorage, Alaska 99519-6612 03/18/1988 50- 029-21784-00-00 4a. Location of Well (Governmental Section): 7. Date T.D. Reached 14. Well Name and Number: Surface: 04/05/1988 PBU W-39 1391' FNL, 1453' FEL, SEC. 21, T11N, R12E, UM 8. KB Elevation (ft): 15. Field I Pool(s): Top of Productive Horizon: 3578' FNL, 2013' FEL, SEC. 21, T11 N, R12E, UM 91.13' Prudhoe Bay Field I Prudhoe Bay Pool Total Depth: 9. Plug Back Depth (MD+ TVD) 3791' FNL, 2113' FEL, SEC. 21, T11N, R12E, UM 9852 + 9157 Ft 4b. Location of Well (State Base Plane Coordinates): 10. Total Depth (MD+TVD) 16. Property Designation: Surface: x- 611789 y- 5958862 Zone- ASP4 9893 + 9192 Ft ADL 028263 TPI: x- 611267 y- 5956667 Zone- ASP4 11. Depth where SSSV set 17. Land Use Permit: Total Depth: x- 611170 y- 5956453 Zone- ASP4 NIA MD ----- .----- ---- -- -- --- 19. Water depth, if offshore 20. Thickness of Permafrost 18. Directional Survey DYes 181 No . NI A MSL I'to.. 1900' (Approx.) 21. Logs Run: If rt::C~I. DIL I SFL, BHCS, LDT/CNLPORO 2. CASING, LINER AND (;EMENTING RECORD . N". "' I If" CASING ISETTINGDEPTH MD .:S.ETTIN<lPEPTH T\fD HOLE "".1< ··....y.l~·SÅ...~" ,..",.pf,jtlJ. SIZE WT. PER FT. GRADE ToP . BOTTOM ToP 6OTTOM Size <PULLED 20" Conductor Surface 110' Surface 110' 8 cu yds Concrè'ft:!6R.. ~ -""v.]· 13-3/8" 68# L-80 Surface 2678' Surface 2678' 17-1/2" 3852 cu ft Cold*J , "101/" ,.. 9-5/8" 47# L-80 Surface 9247' Surface 8646' 12-1/4" 1828 cu ft Class 'G-"'UfShA ..,ul11t.... 7" 26# L-80 9003' 9893' 8445' 9192' 8-1/2" 347 cu ft Class 'G' ·...r/~ /) 23. Perforations open to Production (MD + TVD of Top and 24. T JI3ING <.. Bottom Interval, Size and Number; if none, state "none"): SIZE DEPTH SET (MD) PACKER SET (MD) None 4-1/2", 12.6#, L-80 8982' 8878' MD TVD MD TVD 25. ACID". CTrl .. DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED iJç^~~NE;r nl: f' 5 2005 9504' Set Whipstock .' ." . ", '. n _ ,. -.. L....; tJ:!".;,~ ~:<; ø..;" 9504' P&A wI 25 Bbls Class 'G' 26. PRODUCTION TEST Date First Production: Method of Operation (Flowing, Gas Lift, etc.): Not on Production ..' -- NIA Date of Test Hours Tested PRODUCTION FOR Oll-Bsl GAs-McF WATER-BSl CHOKE SIZE I GAS-Oil RATIO TEST PERIOD + Flow Tubing Casing Pressure CALCULATED + Oll-Bsl GAs-McF WATER-BSl Oil GRAVITY-API (CORR) Press. 24-HoUR RATE 27. CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water (attach separate sheet, if necessary). Submit core chips; if none, state "none". None RBDMS 8Ft 2 3 2005 Form 10-407 Revised 12/2003 CONTINUED ON REVERSE SIDE ~ 28. GEOLOGIC MARKERS 29. FORMATION TESTS NAME MD TVD Include and briefly summarize test results. List intervals tested, and attach detailed supporting data as necessary. If no tests were conducted, state "None". Sag River 9268' 8663' None Shublik A 9301' 8690' Sadlerochit I Zone 4 9446' 8811' 30. List of Attachments: Summary of Pre-Rig Work and Daily Drilling Reports Signed Terrie Hubble PBU W -39 Well Number Title Technical Assistant Date I {/I7 /05 188-014 305-245 Permit No. I A roval No. INSTRUCTIONS GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Prepared By Name/Number: Drilling Engineer: Terrie Hubble, 564-4628 Sean McLaughlin, 564-4387 ITEM 1a: Classification of Service Wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. ITEM 4b: TPI (Top of Producing Interval). ITEM 8: The Kelly Bushing elevation in feet above mean low low water. Use same as reference for depth measurements given in other spaces on this form and in any attachments. ITEM 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00). ITEM 20: True vertical thickness. ITEM 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. ITEM 23: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). ITEM 26: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, or Other (explain). ITEM 27: If no cores taken, indicate "None". ITEM 29: List all test information. If none, state "None". Form 10-407 Revised 12/2003 Submit Original Only e e Well: Field: API: Permit: W -39A Prudhoe Bay Unit 50-029-21784-01-00 205-129 Accept: Spud: Release: Rig: 09/30105 10104/05 1 0/18/05 Nordic #1 PRE-RIG WORK 09/07/05 MIRU. DRIFT TO 9568' SLM WITH 3.70 GR AND 41/2" BRUSH. 09/08/05 DRIFTED TO 9568' SLM AND TAGGED WITH 20' X 3.70 DUMMY WHIPSTOCK, BRUSHED TUBING TO 8950' SLM. 09/09/05 PERFORATED 7" LINER FROM 9505' - 9507' WITH 1.56" TUBING PUNCHER USING LARGE CHARGES. 9 SHOTS FIRED. 09/10/05 COMPLETE BOP TEST. KILL WELL WITH 240 BBLS 1% KCL. RIH WITH BAKER LEFT HANDED MOTOR AND 3.80" OD DS331 PARABOLIC MILL. TAG XN AT 8941' CTM AND MILL OUT TO 3.80". MAKE BACK REAMING PASSES UNTIL NO MOTOR WORK OBSERVED. MADE DRY RUN WITHOUT PROBLEM AND TAGGED TD AT 9661' CTM. POOH, FP TUBING W/38 BBLS 50/50. PUMP 20 BBLS DIESEL DOWN IA TO START FLUID PACK (P&A PREP). HANG FREEZE PROTECT TAG ON TREE. RD BOP'S AND INSTALL ADAPTER FOR E-LlNE. RIU AND RIH WITH BAKER WHIPSTOCK. 09/11/05 RIH WITH 18.9' BAKER GENERATION II TT 3.625" WHIPSTOCK SET AT 9500' WITH 2 RA TAGS LOCATED 10' FROM TOP AT 9510'. WHIPSTOCK ORIENTED 10 DEGREES ROHS LOOKING DOWNHOLE. WELL LEFT SHUT IN, DSO INFORMED ON DEPARTURE. MU 2.0" BDJSN. RIH AND KILL WELL WITH 210 BBLS 1% KCL. DISCOVER BAD SPOT IN PIPE AND HAVE TO POOH. FP WELL WITH 41 BBLS DIESEL. SECURE WELL, BLOW DOWN REEL AND HEAD TO YARD FOR REEL SWAP. HANG FREEZE PROTECT TAGS ON TREE, CONTACT PAD OPR AND PCC WITH WELL STATUS. JOB SUSPENDED PENDING PIPE SWAP. 09/13/05 DRIFT NEW COIL WITH 1.25" BALL. KILL WELL WITH 210 BBLS 1% KCL WHILE RIH. CAP BACKSIDE W/55 BBLS OF DIESEL. TAG WHIPSTOCK AT 9496' CTM, PUH 10' PAINT FLAG. PUMP 25 BBLS OF 15.8 PPG CLASS G CEMENT. ACHEIVE BUMP AFTER 8 BBLS OUT NOZZLE. LAY IN REMAINING CEMENT 1:1 TO 9130' CTM AND SLOWLY RAMP UP TO 850 PSI WHP. WHP LOSS RATE SLOWED TO 13 PSI/MINUTE BY END OF THICKENING TIME. ESTIMATED 5 TO 6 BBLS PLACED BEHIND PIPE. BLED WHP TO -300 PSI AND MADE CONTAMINATION UPIDN PASSES TO WHIPSTOCK TRAY WHILE JETTING W/1.5#/BBL BIO. CHASED OOH AT 80% WHILE JETTING ALL JEWLERY AND MANDRELS. FREEZE PROTECT WELL FROM 2500' WIDIESEL. JET TREE AND BOPS. HANG FREEZE PROTECT TAG ON TREE AND CAUTION TAG ON IA. IA FLUID PACKED. TRAP 200 PSI ON WELLHEAD AND SQUEEZE IS HOLDING. WELL LEFT SHUT-IN. JOB COMPLETE. BP Exploration C>peratlonsSummary Report Pagel .. Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: W-39 W-39 REENTER+COMPLETE NORDIC CALISTA NORDIC 1 Start: 9/22/2005 Rig Release: 10/19/2005 Rig Number: N1 Spud Date: 3/18/1988 End: Date From -To Hours Task Code NPT Phase Description of Operations 9/27/2005 17:00 - 22:00 5.00 RIGO P PRE Rig released from 18-27A @ 17:00Hrs on 9/27/2005. Prep to move rig to W-pad. 22:00 - 00:00 2.00 RIGO N WAIT PRE Unable to open cellar doors to move off well due to high winds. Winds 25 mph, gusting to 45 mph f/ E-NE. Perform general housekeeping and maintenance on rig. 9/28/2005 00:00 - 07:00 7.00 RIGO N WAIT PRE Unable to open cellar doors to move off well due to high winds. Winds 25 - 33 mph, gusting to 46 mph f/ E-NE. Perform general housekeeping and maintenance on rig. 07:00 - 07:30 0.50 RIGO P PRE Held risk assessment & HA/HM for openning cellar doors in high winds. 07:30 - 08:15 0.75 RIGO P PRE Open up cellar doors one at a time from inside using forklift as a stopper. Pin cellar doors. 08: 15 - 08:30 0.25 MOB P PRE PJSM for moving rig off well. 08:30 - 09:00 0.50 MOB P PRE Jack-up rig & pull rig off well. Conduct post-operations pad inspection. 09:00 - 09:30 0.50 MOB P PRE Held pre-move safety meeting with crew, security & tool services. 09:30 - 20:00 10.50 MOB P PRE Move rig from OS#18 to K-pad. Tire failure on off driller's side rear inside tire at K pad entrance road. 20:00 - 00:00 4.00 MOB N RREP PRE Prepare rig for tire change out. 9/29/2005 00:00 - 03:30 3.50 MOB N RREP PRE Prepare rig for tire change out. 03:30 - 10:00 6.50 MOB N RREP PRE Changing out tire. Install stairs & landing. 10:00 - 10:15 0.25 MOB P PRE Held pre-move safety meeting with crew, security & tool services. 10:15 - 00:00 13.75 MOB P PRE Move rig from OS#18 to W-pad. 9/30/2005 00:00 - 21 :00 21.00 MOB P PRE Move rig from OS#18 to W-pad. Arrive @ W-pad access road. Move to W-39 with Tool Services repositioning mat boards at several places. 21 :00 - 21 :30 0.50 MOB PRE MIRU overW-39 21 :30 - 00:00 2.50 BOPSU PRE NU BOPS, Level rig 10/1/2005 00:00 - 06:30 6.50 BOPSU PRE Test BOPS, all rams, lines and valves f/300 - 3500 psi for 5 min each, Annular 250 - 2500 psi. for 5 mins each, Performed Koomey test. Blind shears failed, repaired and tested, passed. Regulator on N2 failed replaced diaphram, repaired and tested passed. Lou Grimaldi w/ AOGCC waived witnessing BOP test. 06:30 - 10:30 WAIT PRE W. O. Wind to swap CT reels. Meanwhile fill pits with 2ppb bio-KCL water. Decide to UO leftover 2-3/8" STL liner in derrick. Open up well - on vac. lAP = Opsi, OAP = 38psi. 10:30 - 10:45 0.25 RIGU P PRE PJSM for LO 2-3/8" STL liner. 10:45 - 14:15 3.50 RIGU P PRE RIH with 32 jts of 2-3/8" STL liner with cementralizers & 8 jts without cementralizers from derrick. POOH & UO 2-3/8" liner in singles. Meanwhile held SIMOPS meeting with Nabors 7ES WSL, Nabors 9ES Wrangel Camp Boss, W-pad Operators, Nordic TP, SLB TL & WSC to discuss & agree on where to position the WSC shack, location control protocols, SIMOPS communication procedures, emergency/evacuation procedures and personnel roles and responsibilities. 14:15 - 18:30 4.25 RIGU N WAIT PRE Shut in master valve. Continue W. O. Wind to swap CT reels - currently @ 20mph steady with 28-33mph gusts. 18:30 - 00:00 5.50 RIGU N WAIT PRE Waiting on Wind to subside to swap CT reels, present wind speed at 16 mph with 26 mph gust. Perform general Printed: 1012112005 1:39:32 PM e BP Exploration Operations. Summary Report Page 2_ Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: W-39 W-39 REENTER+COMPLETE NORDIC CALISTA NORDIC 1 Start: 9/22/2005 Rig Release: 10/19/2005 Rig Number: N1 Spud Date: 3/18/1988 End: Date From - To Hours Task Code NPT Phase Description of Operations 10/1/2005 18:30 - 00:00 5.50 RIGU N WAIT PRE maintenance on rig equipment and housekeeping through out rig. 10/2/2005 ,00:00 - 23:00 23.00 RIGU N WAIT PRE Waiting on Wind to subside to swap CT reels, wind speed I fluctuated through out this period f/ 16 to 22 to 17 mph with 25- I 31 mph gust, wind speed settled down to 10 - 12 mph with 18 mph gust over the last two hours. Dispatched crane to location at 19:00 hours. Perform general maintenance on rig equipment and housekeeping through out rig. Disassemble engager for drive system & discover broken bearings. 23:00 - 00:00 1.00 RIGU IN RREP PRE Crane arrived on location, held JSA w/ crane operator and crew on lifting procedures for coil tubing reels. C/O coil tubing reel. 10/3/2005 00:00 - 00:15 0.25 RIGU N RREP PRE C/O CT reel 00: 15 - 02:00 1.75 RIGU N RREP PRE NU Hardline, Install and pull test internal connection 02:00 - 03:00 1.00 RIGU P PRE Stab pipe, cut pipe, check packoff assy, cut pipe 03:00 - 05:00 2.00 RIGU P PRE MU coil tubing connector, pull test, pump and test surface line i to 4500 psi, install volume dart inside reel, install dart I I connector, Pump volume dart, calculated volume = 60.2 bbls, actual dart displacement = 58.1 bbls. Pressure test coil connector, leaked, changed out connector, test to 3500 psi, 0.50 STWHIP P test inner reel valve f/ 350 psi and 3500 psi for 5 minutes each 05:00 - 05:30 WEXIT M/U window milling BHA #1 with a 3.80" HC DP0261 DWM, I 3.79" go / 3.78" no-go diamond string reamer, Baker straight Xtreme motor, MHA & 2 jts of PH6 tbg (OAL - 84.8'). M/U , injector. 05:30 - 08:00 2.50 STWHIP P WEXIT RIH with BHA #1. Wt check @ 9250': Up = 38k, down = 23k. Tag dry @ 9494'. P/U & bring pumps on. Establish frees pin @ 2.6bpm & 1650psi. RBIH & tag WS/Lnr pinch pt @ 9492'. Flag pipe & correct depth to 9504.6' (pinch pt ELMD). 08:00 - 08:15 0.25 STWHIP P WEXIT SI choke & P/tested wellbore to 1165psi for 10mins - held OK. 08:15 - 09:25 1.17 STWHIP P WEXIT Start milling window with 2.6/2.6bpm 1650/1850psi, <1k WOB & 1.2fph ave ROP. Mill to 9506'. 09:25 - 10:00 0.58 STWHIP P WEXIT Mill window to 9506.4' with 2.6/2.6bpm 1650/1850psi, 1k WOB & 1.2fph ave ROP. Lost pump #1. P/U & switch pumps. Ease back into milling. 10:00 - 10:25 0.42 STWHIP P WEXIT Mill window to 9507' with 2.6/2.6bpm 1650/1800psi, 1.5k WOB & 1.2fph ave ROP. 10:25 - 11 :25 1.00 STWHIP P WEXIT Mill window to 9508' with 2.6/2.6bpm 1650/1800psi, 1.5k WOB & 1fph ave ROP. 11 :25 - 12:25 1.00 STWHIP P WEXIT Mill window to 9509' with 2.6/2.6bpm 1650/1800psi, <1k WOB & 1fph ave ROP. Getting metal shavings on ditch magnets. 12:25 - 13:25 1.00 STWHIP P WEXIT Control mill window to 9510' with 2.6/2.6bpm 1650/1750psi, <1k WOB & 1fph ave ROP. 13:25 - 14:15 0.83 STWHIP P WEXIT Control mill window to 9511' with 2.6/2.6bpm 1650/1750psi, <1k WOB & 1.2fph ave ROP. 14:15 - 14:55 0.67 STWHIP P WEXIT Control mill window to 9512' with 2.6/2.6bpm 1650/1750psi, <1k WOB & 1.5fph ave ROP. Drill into formation @ 9512'. 14:55 - 15:45 0.83 STWHIP P WEXIT Mill formation to 9522' with 2.6/2.6bpm, 1650/1750psi. 12fph ave ROP & 1.5k WOB. 15:45 - 17:00 1.25 STWHIP P WEXIT Backream/dress window/rat hole 3x & drift 2x. Window looks clean. Tentative window depths are: TOWS = 9500', TOW = 9504.6', RA PIP Tag = 9510'. BOW = 9512'. Printed: 10/21/2005 1 :39:32 PM · , BP Exploration Operations Summary Report Page 3 ... Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: W-39 W-39 REENTER+COMPLETE NORDIC CALISTA NORDIC 1 Start: 9/22/2005 Rig Release: 10/19/2005 Rig Number: N1 Spud Date: 3/18/1988 End: Date From - To Hours Task Code NPT Phase Description of Operations 10/3/2005 17:00 - 17:30 0.50 STWHIP N WAIT WEXIT W. O. mud trucks to show up onsite. 17:30 - 18:00 0.50 STWHIP P WEXIT Swap wellbore to fresh 8.6 ppg flopro mud. 18:00 - 19:30 1.50 STWHIP P WEXIT Paint EOP flag @ 9200' & POOH to window milling BHA # 1, while displacing well to 8.6 ppg Flo-Pro wI 2% KCL 19:30 - 20:00 0.50 STWHIP P WEXIT POH, LD BHA, string and window mill in gauge 20:00 - 21 :30 1.50 DRILL P PROD1 MU HCC 3 3/4" x 41/8" Bi-Center PDC Bit, 2.2 deg BH mtr MWD-Dlr-GR, RIH, PU BHA, rehead CTC, pull test to 35k, PIT 3500 psi, stab injector 21 :30 - 23:30 2.00 DRILL P PROD1 RIH, circ at .18 bpm wI 1520 psi, shallow hole test MWD, OK, check orientor at 5015', OK, RIH to EOP flag, correct depth 10' to 9265.50', RIH to tie-in depth at 9420' 23:30 - 00:00 0.50 DRILL P PROD1 Log down with MWD-GR for tie-in pass fl 9400' - 9483' tie-in to Bore Hole Compensated Sonic Log dated 5 April 88', Corrected '~; depth +3' 10/4/2005 00:00 - 00:45 0.75 DRILL P PROD1 Log down with MWD-GR for tie-in pass fl 9453' - 9483' tie-in to Bore Hole Compensated Sonic Log dated 5 April 88', Corrected depth +3', Slacked off through window without pumps, tagged btm at 9524', PU to 9450', free spin wI 2.3 bpm at 3350 psi 00:45 - 01 :45 1.00 DRILL P PROD1 Slack off through window w/o pumps to 9516', Orient around to 40L TF 01 :45 - 02:45 1.00 DRILL P PROD1 Drilling build section f/9524' - 9552'. Off I On btm: 3350 psi I 3800 psi wI 2.44 bpm TF: 35L WOB 2k Tie-in to RA tag at 9509.5'. WS adjusted -.5'. TOWS - 9499.5' TOW - 9504.10' RA - 9509.5' BOW - 9511.5' 02:45 - 04:00 1.25 DRILL P PROD1 Drilling build section fl 9552' - 85'. Off I On btm: 3350 psi I 3 psi. 2.44 bpm TF: 23L WOB 2-3k 04:00 - 04:30 0.50 DRILL P PROD1 Orient around to TF 04:30 - 04:50 0.33 DRILL P PROD1 Drilling build ction fl 9585' - 9593'. Off I On : 3350 psi 13750 psi wI 2.33 bpm. TF: WOB 2-2.5k 04:50 - 05:30 0.67 DRILL P lent 3 clicks & drill to 9606' with 25L-55L TF, 2.45/2.45bpm, 3350/3550psi, 2.5k WOB & 20fph aye ROP. Pulling back to window to get clicks. 05:30 - 05:55 0.42 DRILL P Orient 2 clicks & drill to 9614' with 15L-25L TF, 2.45/2.45bpm, 3350/3550psi, 2.5k WOB & 20fph aye ROP. 05:55 - 06: 10 0.25 DRILL P PROD1 Orient TF to 20R. Up wt = 36k. Run-in wt = 25k, lAP = 45psi & OAP = 100psi. PVT = 298bbls. 06:10 - 06:45 PROD1 Drill to 9633' with 15R TF, 2.4/2.4bpm, 3350/3450psi, 1.5k WOB & 30fph aye ROP. 06:45 - 07:10 PROD1 Orient 1 click & drill to 9642' with 16R-25R TF, 2.45/2.45bpm, 3450/3600psi, 1.5k WOB & 25fph aye ROP. P PROD1 Orient 2 clicks & drill to 9661' with 20R-35R TF, 2.45/2.45bpm, 3450/3700psi, 1.5k WOB & 20fph aye ROP. Penetrate 41N shale @ +1- 9650'. 0.42 DRILL P PROD1 Orient 2 clicks & drill to 9664' with 35R TF, 2.45/2.45bpm, 3450/3700psi, 3k WOB & 1 Of ph aye ROP. 1.42 DRILL P PROD1 Orient 2 clicks & drill to 9696' with 55R TF, 2.45/2.45bpm, 3750/4050psi, 2k WOB & 25fph aye ROP. Decide to POH for Printed: 1012112005 1:39:32 PM ) ) .f~.' n: 'S~,,;,..:J li~'\. '¡ , '1:, 7,;J : [', ';;¡.' \ ì\,~'" : ;1 .: r \ ¡ ; I . ''\ " '1'" I E" .' ~""\""'" i:1 ,/;w \! ;, i . "'11~) ,I ln' ~ \\ I ; \:::::.J :,,,J ¿f,) U [_ !.-<J re~ I '..:'_J !J _..~ : :1 :L 1._;:] I,;;-I'~.\., i ;\ '\ " .:-!,\~ ~}"l,¡j FRANK H. MURKOWSKI, GOVERNOR AJ,ASIiA. OILAlWD GAS CONSERVATION COMMISSION 333 W. pH AVENUE, SUITE 100 ANCHORAGE, ALASKA 99501-3539 PHONE (907) 279-1433 FAX (907) 276-7542 Sean McLaughlin CT Drilling Engineer BP Exploration (Alaska) Inc. P.O. Box 196612 Anchorage, Alaska 99519-6612 \~/t>\~ Re: Prudhoe W-39 Sundry Number: 305-245 ,'" "'A!i\ U..II E" h'\ ~\ U r- ":\, .0<) ~) (I (rt. ,:~Ct .I!~'~,\,; . ,j,,' h i.J ,j¡ J t;"1 ),! Dear Mr. McLaughlin: Enclosed is the approved Application for Sundry Approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. Please provide at least twenty-four (24) hours notice for a representative of the Commission to witness any required test. Contact the Commission's petroleum field inspector at (907) 659-3607 (pager). As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the Commission grants for good cause shown, a person affected by it may file with the Commission an application for rehearing. A request for rehearing is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. A person may not appeal a Commission decisio Superior Court unless rehearing has been requested. W. Slp:ce , i K. Chairman DATED this~c;day of August, 2005 Enc!. ti'.i G 1:- f /2.6: 12.-00 ç- fJ ~5 .f' 12t~- ) STATE OF ALASKA ) RËr't::l:..~ ALASKA OIL AND GAS CONSERVATION COMMISSION - Jl[,,,", tV It'lf'''''' APPLICATION FOR SUNDRY APPROVAf.uG2 ¿12DD5 20 MC 25.280 Alaska Oil & 1. Type of Request: IBI Abandon / 0 Suspend 0 Operation Shutdown 0 Perforate 0 Other o Alter Casing 0 Repair Well 0 Plug Perforations 0 Stimulate 0 Re-Enter Suspended Well o Change Approved Program 0 Pull Tubing 0 Perforate New Pool 0 Waiver 0 Time Extension 2. Operator Name: BP Exploration (Alaska) Inc. 3. Address: P.O. Box 196612, Anchorage, Alaska 7. KB Elevation (ft): 4. Current Well Class: , aD Development 0 Exploratory o Stratigraphic 0 Service 5. Permit To Drill Number 188-014 .......- 6. API Number: 50- 029-21784-00-00 ../ 99519-6612 91.13' 9. Well Name and Number: PBU W-39 /' 10. Field I Pool(s): ADL 028263 Prudhoe Bay Field I Prudhoe Bay Pool "Ii'" " 'I,.. ",:,..PR~SENT,WE~~CQN jl,ir'Qf::J'ISÇJ,MNlt\~¥)::':::,¡,I,¡""", ',,:\,:':::',. ",."," :ii',,;',:: '::,":I,",}!(I;" I,!I:,';,,: (,.,',",'.,.....""'.' TO,tal Depth TVD (ft): I Effect"ive Depth MD (ft): IEffective Depth TVD (ft): Plugs (measured): Junk (measured): 9192 9852 9157 None None Length $ize ' MD TVD \ BUrst ' Collapse 8. Property Designation: 1,1~ Total Depth MD (ft): 9893 Casing Structural Conductor Surface Intermediate Productioo Liner 110' 20" 110' 110' 2678' 13-3/8" 2678' 2678' 4930 2270 9247' 9-5/8" 9247' 8646' 6870 4760 890' 7" 9003' - 9893' 8445' - 9192' 7240 5410 Perforation Depth MD (ft): Perforation Depth TVD (ft): 9602' - 9691' 8943' - 9019' Packers and SSSV Type: 9-5/8" x 4-1/2" TIW 'HBBP-R' packer; 4-1/2" Otis SSSV Nipple Tubing Size: 4-1/2", 12.6# Tubing Grade: L-80 Packers and SSSV MD (ft): 8878' 2017' Tubing MD (ft): 8982' 12. Attachments: aD Description Summary of Proposal 0 BOP Sketch o Detailed Operations Program 14. Estimated Date for Commencing Operations: 13. Well Class after proposed work: /" o Exploratory aD Development 0 Service 16. Verbal Approval: Commission Representative: 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Printed Name Sean McLaughlin Title CT Drilling Engineer S~ /Vll{/\'/ ;,,..., '¿ SePtembetp1,/2005 Date:..;'/" '-"'" 15. Well Status after proposed work: OOil o Gas o WAG 0 GINJ // o Plugged aD Abandoned o WINJ 0 WDSPL Contact Sean McLaughlin. 564-4387 Signature Phone 564-4387 Commission Use Only Date <¿!2t!OS I Sundry Number: .3 c '5- - d- tf j- Prepared By Name/Number: Terrie Hubble, 564-4628 Conditions of approval: Notify Commission so that a representative may witness o Plug Integrity o BOP Test o Mechanical Integrity Test o Location Clearance Other: 1\,') r vo Jr¿ d ~ { LO - 40 l Y"'D~",-"d ~¡/ ~ck ~IL U~U (4- y¡ A-. RBDMS BFL AUG 3 U 2005 COMMISSIONER APPROVED BY THE COMMISSION Date r:j//dr/ þb~l D~~licate ORiG!í\~Þ\L ) ) 1'0: Winton Aubert Petroleum Engineer Alaska Oil & Gas Conservation Commission JJ From: Sean McLaughlin CTD Engineer Date: August 23,2005 Re: W-39 Sundry Approval Sundry approval is requested for well W-39. W-39 was drilled and completed in 4/88. By 4/89, oil rate had plummeted, gas rate was up, and W -39 was shut-in. A neutron log showed the GOC had moved down into the 45P, 60 feet TVD from the' 42P perfs. In 7/90 an IBP was set at 9647' MD to try to shut-off the gas entry from the 41 P 131 P perfs. This did nothing to improve oil rates or reduce gas rates and W-39 remained shut-in. The well was POP'd briefly in 1996 and gas rate was up most likely due to gas injection in offset injector, W-42. For the first part of 2003, W-39 was only produced intermittently as MGOR at GC2 allowed. Rocks up to 1" diameter were discovered in the choke 8/04. The well has been shut in since then awaiting a cleanout with 2 3/8" coiled tubing. However, modelling indicates the cleanout may not even be possible due to the short section of exposed 95/8" casing and associated reduced annular velocity while attempting to lift rocks. There is also significant risk of the coiled tubing getting stuck while attempting to cleanout rocks. A coil sidetrack seems to be a much lower risk and expedient alternative to return the well to production. SLB/Nordic 1 Coiled Tubing Drilling rig is scheduled for a W-39 sidetrack on or around September 20,2005. The sidetrack, W-39A, will exit the existing 7" liner from a whipstock in Zone 4 and will target Zone 2 and 4 sands. The existing perforations will be isolated by a cement plug after a whipstock is set at 9500'. ~he planned completion is a solid, cemented, and perforated liner. The following describes work planned and is submitted as an attachment to Form 10-403. A schematic diagram of the proposed sidetrack is attached for reference. Pre-Rig Work: 1. 0 AC-LDS/POT; AC-PPPOT -IC, T 2. E Tubing punch at 9500' " 3. E Set whipstock at 9500' 4. C Use LH~tõvto mill XN nipple to 3.8" 5. C Pump 3J1¡)'is of 15.8 ppg cmt. 6. 0 Bleed-lift and production flowlines down to zero and blind flange 7. 0 Remove wellhouse, level pad ~~5T.D wo~~ is slated to be~in on se~. /}ì005. - ---. r lvl S \ c - 4· C<) ove i (J " ~ I. Rig Work: 1. MIRV and test BOPE to 250 psi low and 3500 psi high. 2. Mill 3.8" window at 9500' and 10' of Zone 4. Swap the well to Flo-Pro. 3. Drill Build: 4.125" OH, 300' landing in Zone 1 (22 deg/100 planned) 4. Drill Lateral: 4.125" OH, 2550' horizontal (12 deg/l00 planned) 5. Run 3 ~" x 3 3/16" x 2 7/8" solid liner leaving TOL at 8925' 6. Pump primary cement job to 9325, 36.8 bbl of 15.8 ppg liner cmt planned 7. Cleanout liner and MCNL/GR/CCL log 8. Test liner lap to 2000 psi. 9. Perforate liner per asset instructions 10. Freeze protect well, RDMO MIT IA and OA; PT MV and SV ' "" Post-Rig Work: 1. Move wellhouse, Install production flowline 2. RunGLVs 3. Flowback well to separator Sean McLaughlin CTD Engineer 564-4387 CC: Well File Sondra StewmanfTerrie Hubble TREE = 4" CIW "6~~~~::": A~~~~ ) W -39 KB. ELEV' = 90.99' BF. ELEV = 54.79' KOP = 5100' ~a~",t\~~I,~",= ~~~~~~~ì .. Datum MD = 9540' . "·,...../Y',W',.,.,,.NN',...~I'M'N..~·.w",·,.,.m,·,w,·""'·'m,w"','.,·.,·,w,·..,.....,....,"MWtw,,·~.," Datum lVD = 8800' SS 13-3/8" CSG, 68#, L-80, ID = 12.415" 1--1 2678' ~ L Minimum ID = 3.725" @ 8949' 4-1/2" OTIS XN NIPPLE I I í·.,','!~: :¡~~::; @ z z 14-1/2" TBG, 12.6#, L-80, .0152 bpf, ID = 3.958" l-i 8982' I TOP OF 7" LNR l-i 9003' ! , I 9-5/8" CSG, 47#, L-80, ID = 8.681" 1--1 9247' ~ PERFORA TION SUMMARY REF LOG: BHCS ON 04/05/88 ANGLE AT TOP ÆRF: 32 @ 9602' Note: Refer to Production DB for historical perf data SIZ E SPF INTERV A L Opn/Sqz DA TE 5" 4 9602 - 9620 0 04/10/88 5" 4 9636 - 9646 0 04/10/88 5" 4 9656 - 9672 0 04/10/88 5" 4 9682 - 9691 0 04/10/88 I PBTD 1--1 9852' ~ I 7" LNR, 26#, L-80, .0383 bpf. ID = 6.276" 1--1 9893' DATE REV BY COMMENTS DATE REV BY COMMENTS 04/11/88 ORIGINAL COM PLETJON 09/09/01 RN/TP CORRECTIONS 1 0/29/03 JLJ/TLH GL V C/O (09/30/03) 04/01/05 JLP/TLH TBG CORRECTION it:!I! :,\¡ì:, iM ~:::$:: - .. ! I I I SA)rNOTES: 2017' ~14-1/2" OTIS SSSV NIP, ID = 3.813" 1 ST MD lVD ~ 8 2954 2863 7 5346 5245 6 6339 6113 5 6892 6571 4 7424 7025 3 7939 7462 2 8453 7897 1 8684 8091 GAS LIFT MANDRELS DEV 1YÆ VLV LATCH o MERLA DOME RA 19 MERLA SO RA 36 MERLA DMY RA 32 MERLA DMY RA 31 MERLA DMY RA 32 MERLA DMY RA 33 MERLA DMY RA 33 MERLA DMY RA PORT DATE 16 09/30/03 20 09/30/03 o o o o o o 8803' ~14-1/2" OTIS SLIDING SLV, ID = 3.813" 1 8862' ~14-1/2" TBG SEAL ASSY I 8878' ~19-5/8" X 4-1/2" TIW HBBP-R PKR, ID = 4.0" 1 8917' ~14-1/2" OTIS X NIP, ID = 3.813" 1 8949' H4-1/2" OTIS XN NIP, ID = 3.725" 1 8982' ~14-1/2" TBG TAIL WtEG, ID =: 3.95å7.l 8990' 1--1 ELMD TT LOGGED 07/01/88 1 9465' 1--1 MARKER JOINT I PRUDHOE BA Y UNIT WELL: W-39 ÆRMIT No: 1880140 API No: 50-029-21784-00 SEC 21, T11 N, R12E. 1426' SNL & 1454' WEL BP Exploration (Alas ka) ") W-39A TREE = WELLHEAD = , " "". ,. . ,. ACWA TOR = KB. ELEV;" BF. ELEV = KOP= "" "',,"" ,,,,." Max Angle = Datum MD = Datum lVD = 4"C~ MCEVOY 'AXELSON 90.99' 54.79' 5100' 36 @ 6400' 9540' 8800' SS Proposed CTD Sidetrack 13-3/8" CSG, 68#, L-80, ID = 12.415" I., 2678' ~ Minimum ID = 3.8" @ 8949' 4·1/2" OTIS XN NIPPLE 4-1/2" TBG, 2.6#, L-80, 0.0152 bpf. ID = 3.958" I., I TOP OF 7" LNR I., 8982' 9003' 9-5/8" CSG, 47#, L-80, ID = 8.681" I., 9247' ÆRFORA TION SUMMARY REF LOG: BHCS ON 04/05/88 ANGLE A T TOP ÆRF: 32 @ 9602' Note: Refer to A'oduction DB for historical perf data SIZE SPF INTERV AL Opn/Sqz DATE 5" 4 9602 - 9620 isolated proposed 5" 4 9636 - 9646 isolated proposed 5" 4 9656 - 9672 isolated proposed 5" 4 9682 - 9691 isolated proposed 1 PBTD I., 9852' 7" LNR, 26#, L-80, 0.0383 bpf, ID = 6.276" I., 9893' DATE 04/11/88 02/15/01 03/05/01 09/09/01 05/01/03 REV BY COMMENTS ORIGINAL COMPLETION SIS-QAA CONVERTED TO CANVAS SIS-LG FINAL RN/TP CORRECTIONS LLG PROPOSED CTD SIDETRACK DATE 1 1--. µ REV BY - L I I i z i g f I .. SAA...~OTES: 2017' H4-1/2" OTIS SSSV NIP, ID = 3.813" 1 ~ GAS LIFT MANDRELS ST MD lVD DEV lYPE VLV LATCH PORT DATE 8 2954 2863 0 MERLA TPD RA 7 5346 5245 19 MERLA TPD RA 6 6339 6113 36 MERLA TPD RA 5 6892 6571 32 MERLA TPD RA 4 7424 7025 31 MERLA TPD RA 3 7939 7462 32 MERLA TPD RA 2 8453 7897 33 MERLA TPD RA 1 8684 8091 33 MERLA TPD RA 8803' H4-1/2" OTIS SLIDING SLEEVE, ID = 3.813" 8862' H4-1/2" TBG SEAL ASSY 1 8878' - 9-5/8" X 4-1/2" T~ HBBP-R PKR, ID = 4.0" 1 8917' - 4-1/2" OTIS X NIP, ID = 3.813" 1 8925' - Top of 3-3/16" Liner I 8949' H4-1/2" OTIS XN NIP, ID milled to 3.8" 8950' Ij3-1/2" X NIP, ID = 3.813" 1 8982' H4-1/2" TBG TAIL WLEG, ID = 3.958" 1 8990' I., ELMD 1T LOGGED 07/01/88 1 9325' I., Top of Cement I 10300' 1"3-3/16 x 2-7/8 X-over I 3-3/16" X 2-7/8" cmt'ed and perfedl., 12350' 9500' I., Mechanical Whipstock COMMENTS 9465' I., MARKER JOINT 1 PRUDHOE BAY UNIT WELL: W-39 ÆRMIT No: 88-0140 API No: 50-029-21784-00 SEC21, T11N, R12E, 1426'SNL& 1454'WEL BP Exploration (Alaska) ) ) Date: To: From: S ubj ect: August 25, 2005 vb . ') File / [IV Jane Williamsorí'" /Î Prudhoe Well W-39 BP has requested sundry approval for plugback ofPBU Well W-39 to allow for later sidetrack. Attached are production and decline plots for the well. The well was drilled in 1988 and produced through mid 1989. During the year, oil production declined from 4000 BPD to less than 200 BPD. GOR increased significantly to 30,000 SCF ISTB. An attempt in 1990 to shut-off gas entry in the well failed. The well was intermittently produced during 2002-2004. The oil rate declined from a maximum of 1400 BPD in November 2003 to 300 BPD in August 2004. Water cut increased to 65% from less than 20% during this time. Our data showed GOR decreasing from 30,000 scflstb to around 9,000 scf/stb. This does not match the information reported within the sundry request. BP reports that rocks have been found in the production choke and that they are not optimistic that a coiled tubing cleanout would be successful. I estimate less than 60 MSTB reserves remaining in the existing completion - without deduction for gas and water production backouts. The sidetrack will contact the Sadlerochit~ hence reserves will likely not be left behind with this plugback. The sundry request should be approved. ) " 5 10 PRUDl-ŒBA.Y, PRUDHŒOL PBU_W PRUDHŒ BA.Y W39 j .. ~.~ 4 10 · .. ,. 103 . 2 10 . . . . . II . .. · 1fr . . . 1 . 10- , .f. · 6- \~. }.~ 10° W'39 '[ _ 01 Rate (CD) ( bbl/d) I - Water Rate (CD) (bbl/d ) _ GIs Rate (CD) (M:f/d ) ~ PPT.PRESS(M) Water In) Rate (CD) ( bbl/d ) _ Cum 01 Prod (rvbbl ) - WaterCuI _ GIs 101 Ratio (cflbbl ) 1'2000~r '0,--["02' 'I :~ I):¡e 3:XXI PRlDŒ~Y, PRlDŒaL PRlDŒ ~y ,W.æ.. 1!XXJ u ::::. .c : A1ase 01 .c ¡:;: &X) I Cæe Nare Cæe1 S ib 0 Q) I Di 0.787345 Ae. ¡¡¡ ,q :Œ.4 ttIId a:: ti ŒlD'2fJ:1j Õ , te æ31/~ , 8'd Rae 50 ttIId Rm Råe 49. ææ ttIId Clrn Atxi 107a97 M:ti Clrn Dáe œ'DZD4 100 Reõerves 51El M:ti BJR 1139.23 M:ti Faææt Erœ:I B,t Råe Faææt [)¡;te 50 2XI2 œ 04 Œ STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVAL 1. Type of Request: [] Abandon [] Suspend [] Plugging [] Time Extension [] Perforate [] Alter Casing [] Repair Well [] Pull Tubing [] Variance [] Other [] Change Approved Program [] Operation Shutdown [] Re-Enter Suspended Well [] Stimulate Plug Back for Sidetrack 2. Name of Operator BP Exploration (Alaska) Inc. 3. Address P.O. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 1391' SNL, 1453' WEL, SEC. 21, T11N, R12E, UM At top of productive interval 3578' SNL, 2013' WEL, SEC. 21, T11N, R12E, UM At effective depth 3771' SNL, 2105' WEL, SEC. 21, T11N, R12E, UM At total depth 3791' SNL, 2113' WEL, SEC. 21, T11N, R12E, UM 5. Type of well: [] Development [] Exploratory [] Stratigraphic [] Service X = 611789, Y = 5958862 X = 611267, Y = 5956667 X = 611178, Y = 5956472 X = 611170, Y = 5956453 6. Datum Elevation (DF or KB) KBE = 91.13' 7. Unit or Property Name Prudhoe Bay Unit 8. Well Number W-39 9. Permit Number 188-014 10. APl Number 50- 029-21784-00 11. Field and Pool Prudhoe Bay Field / Prudhoe Bay Pool 12. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical Casing 9893 feet 9192 feet 9852 feet 9157 feet Plugs (measured) Junk (~~E~ ~.¥ ~ ~ 200,3 Length Size Cemented M D Structural Conductor 110' 20" 8 cu yds Concrete 110' Surface 2678' 13-3/8" 3852 cu ft Coldset II 2678' Intermediate 9247' 9-5/8" 1828 cu ft Class 'G' 9247' Production Liner 890' 7" 347 cuft Class 'G' 9003' - 9893' TVD 110' 2678' 8646' 8445' - 9192' Perforation depth: measured true vertical 9602'-9620', 9636'-9646', 9656'-9672', 9682'-9691' 8943'-8959', 8972'-8981', 8989'-9003', 9011'-9019' RECEIVED Tubing (size, grade, and measured depth) 4-1/2", 12.6#, L-80 to 8982' MAY 3 3 2003 Packers and SSSV (type and measured depth) 9-5/8" x 4-1/2" TIW 'HBBP-R' packer at 8878'; 4-1/2" O~ipple ~t=20T'7' 13. Attachments [] Description Summary of Proposal 14. Estimated date for commencing operation June 1, 2003 16. If proposal was verbally approved Name of approver Date Approved Contact Engineer Name/Number: Mary Endacott, 564-4388 15. [] Detailed Operations Program [] BOP Sketch Status of well classifications as: [] Oil [] Gas [] Suspended Service Prepared By Name/Number. Terrie Hubble, 564-4628 17. I hereby certify that the foregoing is tr, Ije and corregt)o the best of my knowledge Signed M aryEndacott"~~/~-/.~~~~i-itle CT DrillingEngineer ' ' Date Approval No. ~O~-- / q5 Conditions of Approval: Notify Commission so representative maYv,Witness Plug integrity __ BOP Test ~ Location clearance __ Mechanical Integrity Test ,X, Subsequent form required 10- 7 Approved by order of the Commission Form 10-403 Rev. 06/15/88 Commissioner Date ~..~/0 ~1 Submit in Triplicate ObP To' Winton Aubert Sr. Petroleum Engineer Alaska Oil & Gas Conservation Commission From: M.S. Endacott CTD Engineer Date: May 9, 2003 8OANNED f' AY' ! 6 2003 Re: CTD Sidetrack of well W-39 W-39 is scheduled for a through tubing sidetrack with the Nordic I coil drilling rig. The sidetrack, W-39A, will kick off from a window milled in Zone 4 and will target Zone 4 & Zone 2. The perfs will be isolated by cement and the new sidetrack will be completed with a fully cemented liner. / The following describes work planned to prep for sidetracking and is submitted as an attachment to Form 10-403. A schematic diagram of the proposed sidetrack is attached for reference. 1. MIT IA and OA ~'' 2. Mill XN , ,,... ---% 3. Set whipstock at 9500 /~_ / 4. Downsqueeze minimum/l'5b..b[ cement Steps 2-4 will be performed with service coil, scheduled for June 1, 2003. M.S. Endacott CTD Drilling Engineer CC: Well File Terrie Hubble TREE= 4' CI~/ WELLHEAD= MCEV OY W~l*l~ 9 ,AJ:ETY "O~E$: AC TUA TO R -- AXELS ON .. BF. ELEV = 54.7a' KOP= 5100' i 2(]17, ~ m4.1/.Z, OTiS SSSV NiP. iD = 3.B13,, i Datum IvD = gSZlO, DatumTVD= 8SDD' SS OAS UFTMANDRELS ST I~D T~D DEV TYPE VLV LATCH PORT DATE k 8 2~(i4 21~3 0 I~ERLA TPD RA I ~' CS<3. el~/. L-a0. ID-- 12.415" H 26~r8'~ -- T 5348 5245 19 I~RLA TPD RA 0 0339 0113 36, f,/ERLA TPD FtA 5 6E)g2 6571 32 I~IERLA IPD RA 4 7424 7025 31 I~ERLA TPD RA L 3 703g 7402 32 I~ERLA TPD RA 2 B~i3 7Bg7 33 ~ERLA TPD RA I 81~84 8D8t 3;3 IV~RLA TPD I;tA Minimum ID = 3.725" ¢~ 8949' ' als3' !-14-~' ohs SUb,NO SLEEVE. ~D =~.8~3" I 4-1/2" OTIS XN NIPPLE ! X ~ I m ~Sm' HO-5/E~' X4-1/2" TIW HBBP-R PIG;[. ID =4.0" m I I I I m '- , m4~. H~l~, o.s.. N~.. ~D = ~.~2~' I I ~ ' ~ k ' age2' H~i~, TBO TAILWLEO. ID= 3.951~' ,, I 94§$' MMARKER JOINT PERFORATION S UldlVIARY REF L0¢3: BH¢S ON n4~35/a~ ANOLE AT TOP PEEF: 32 {~ 1~02' Nate: Refer te Production DB fat histerioalper( data SIZE SPF INTERVAL ! Dpn/Sqz bATE 5" 4 9050 - 9072 ' 0 04/1D/88 5" 4 ~OB2 - 9601 0 04/10/~8 J 7" LNR, 28~/, L-80, 0.D383 bpf. ID = 0.27Q"H 9e93'I i · DATE REV BY COIvN~TS bATE RE,/BY COMIVENTS PRUDHOE 8AY UNIT 04/11/~, ORIGINAL COI~'LETION WELm' W-3~) 02/15/01 $1S-QAAi CONVICTED TO CANVAS PERMITNo: ~-01zlO 03/05/91 SiS- LO FINAL AFl Nc): 50-029-21784-D0 09/09/01 RN/TP CORRECTIONS SEC 21. TllN. R12E. 1420' SNL & 1,~S4' WEL ; : ~ BP E,(ploraticm (Al~s ka) PERFORATION S UldlvtARY RBr LO0: BH¢S ON 04~135/!~ ANOLE AT TOP PERF: 32 N~te: Refer to Production DBf~r histori~alperf data 517 E SPF IN TERVA L Dp n/S qz DA TE 5" 4 g802 - gO20 O 04/10/88 5" 4 ge)38 - 0040 0 04/10/~)8 5" 4 9050 - g072 0 04/10/t~8 5" 4 gOB'2 - 0001 ID 04/10/:E)8 DATE REV BY COIVI~I~ITS DATE Re,/BY COMIVENTS 04/11/I~ ORIGINAL OOlt~LETIDN 02115/01 $1$-QAA CONVBRTED TO CANVAS 03/05/01 SIS- LG FINAL 139/09/01 RN/TP OORRE~TIONS WELLHEAD = MCEVOY ACTUATOR = AXELSON KB. ELEV = 90.99' BF. ELEV = 54.79' KOP = 5100' Max Angle = 36 @ 6400' Datum MD = 9540' Datum TVD = 8800' SS I 13-3/8" CSG, 68//, L-80, ID = 12.415" Id 2678' W-39AI Proposed CTD Sidetrack SAFETY NOTES: 2017' l--14-1/2" OTIS SSSV NIP, ID = 3.813" GAS LIFT MANDRELS DA'T[ IMinimum ID = 3.725" @ 8949' 4-112" OTIS XN NIPPLE 8803' ~14-1/2" OT~ SUD~NG SLEEVE. ~D = 3.813" 8982' I TOPOF 7" LNRId 9003' 9-5/8" CSG, 47#, L-80, ID = 8.681" Id 9247' 8862' FI4-1/2" TBG SEAL ASSY I 8878' x 4-1/2- TIW HBBP-R PKR, ID = 4.0" 8917' 4-1/2" OTIS X NIP, ID = 3.813" 8925' Top of 3-3,'16" Liner 8949' ~-14-1/2" OTIS XN NIP, ID = 3.725" I 895e~ - 1_i3-u~;-.x N~P. ~.~: 3.813"I 8982' Fi4_1/2- TBG TAIL WLEG, ID = 3.958" I 8990' I~ ELMD'I-rLOGGED07/01/881 PERFORATION SUMMARY RE~ LOG: BHCS ON 04/05/88 ANGLE AT TOP PEP, F: 32 @ 9602' Note: Refer to Production DE, for historical perf data SIZE SPF INTERVAL Opn/Sqz DATE 5" 4 9602 - 9620 isolated proposed 5" 4 9636 - 9646 isolated proposed 5" 4 9656 - 9672 isolated proposed 5" 4 9682 - 9691 isolated proposed IP~ I-I 9852' I I 7" LNR, 26#, L-80, 0.0383 bpf, ID- 6.276" Id 9893' 10300' H3-3/16 x 2-718 X-over 3-3/16" X 2-7/8" cmt'ed and perfedJd 12295' °^~ I ~ ~'''' I o~11~881 IO~,,,L coMe,ION 0~,,~,o, I s.s-~^ ICO.v~.o o3~o5~olI S~-LG o~,o~,o~ I ~ Ic°~'~°Ns DATE REV BY GOMMENTS PRUDHOE BAY UNIT WELL: W-39 PERMIT No: 88-0140 APl No: 50-029-21784-00 SEC 21, T11N, R12F__, 1426' SNL & 1454' WF1 BP Exploration (Alaska) Form 10-407 Rev. 7-1-80 \, \ · ~'~-~' STATE Of ALASKA ALASKA OIL AND GAS CONSERVATION coIVlMISSION WELL COMPLETION OR RECOMPLETION REPORT AND L 1. Statues of Well Classification of Service Well OIL [] GAS [] ~ENDED [] ABANDONED [] SERVICE [] 2. Name of Operator 7. Permit Number Stand.ard Alaska Production Company 88-14 3. Address B. APl Number P. O. Box 196612, Anchorage, Alaska 99519-6612 5o- 029-21784 4. Location of well at surface 9. Unit or Lease Name ~LO~ATIOt~S!' Prudhoe Bay Unit 1391' SNL, 1453' WEL, SEC 21, TI IN, R12E 10. Well Number At Top Producing Interval 3584'SNL, 1999' WEL, SEC 21, T11N, R12E'rSUrf'~ ii'Surf' ~ W-39(33-21-11-12) At Total Depth~t Prudhoe Bay Field/Prudhoe Bay Pool 3795' SNL, 2096' WEL, SEC 21, T11N, R12E 5. Elevation in feet (indicate KB, DF, etc.) ~6. Lease Designation and Serial No. 91.13'= KBE I ADL 28263 12. Date Spudded 13. Date T.D. Reached 14. Date Comp., Susp. or Aband. 115. Water Depth', if olfsho r e 116. No. of Completions 3-18-88 4-5-88 4-12-88I N/A feet MSL I One 17. Total Depth (MD+TVD) 18. Plug Back Depth (MD+TVD)19. Directional Survey 120. Depth where SSSV set 121. Thickness of Permafrost I 9893' MD. 9191' TVD 9852' 9156' TVD YES [] NO [] 2016 feet MD I 2000' 22. Type Electric or Other Logs Run DIL/SFL, BHCS, LDT/CNL PORO 23. CASING, LINER AND CEMENTING R~ SETTING DEPTH MD CASING SIZE WT. PER FT. GRADE TOP Bo'FrOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED 20" Conductor Surface 110' 8 cu yds Concrete 13-3/8" 68# L-80 Surface 2678' 17-1/2" 3852 cu ft Cold Set II 9-5/8" 47# L-80 NSCC Surface 4498' 12-1/4" 9-5/8" 47# L-80 Butt 4498' 9247' 12-1/4" 1828 cu ft Class G 7" 26# IJ4S 9003' 9893' 8-1/2" 347 cu ft Class G 24. Perforations open to Production (MD+TVD of Top and Bottom and 25. TUBING RECORD interval, size and number) SIZE DEPTH SET {MD) PACKER SET (MD) 5" Gun at 4 spf. 4-1/2" 12.6# L-80 8982' MD 8878' MD MD TVD 9602'-9620' 8853'-8868' 9636'-9646' 8881'-8890' 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. 9656'-9672' 8898'-8912' DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED 9682'-9691' 8920'-8928' 13-3/8" X 9-5/8" Down squeeze 13-3/8" x 9-5/8" 300 sx Permafrost followed by 125 bbl dry crude 27. PRODUCTION TEST Date First Production IMethod of Operation (Flowing, gas lift, etc.) 4-10-88 I Flowing Date of Test Hours Tested PRODUCTION FOR OIL-BBL GAS-MCF WATER-BBL CHOKE SI71= IGAS-OIL RATIO TEST PERIOD I~ I Flow Tubing Casing Pressure CALCULATED OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-APl (corr) Press. 24-HOUR RATE 28. CORE DATA Brief description of lithology, porosity, fractures, apparent dips, and presence of oil, gas or water. Submit core chips. CONTINUED ON REVERSE SIDE Submit in duplicate 29. ,~,, 30. GEOLOGIC MARKERS FORMATION TESTS NAME Include interval tested, pressure data, all fluids recovered and gravity, MEAS. DEPTH TRUE VERT. DEPTH GOR, and time of each phase. SAG 9263' 8658' Shublik A 9302' 8691' Zone 4 9451' 8815' (Top Ivishak/ Sadlerochit) 31. LIST OF ATTACHMENTS 32° I hereby cedify that the foregoing is true and correct to the best of my knowledge Signed ~-~ ~v Title PBUDrillinaEnoineerinoSunervisor_ _ _ Date ~//~ Y/~/ / INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Item 1' Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combusticn. Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). Item 23: Attached supplemental records for this well should show the details of any multiple stage cement- ing and the location of the cementing tool. Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In- jection, Gas Injection, Shut-in, Other-explain. Item 28: If no cores taken, indicate "none". Form 10-407 STANDARD ALASKA PRODUCTION Daily Drilling Report -- PRUDHOE BAY March 17, 1988 at 0600 hrs Rig: AUDI #3 Well: W-39 (33-21-11-12) AFE # 120636 AFE Amount: Current Amount: 0600 Depth: Day: 24- Hour Ftg: Water Used: -1 1000 Current Operation: Rig up. Skid rig. Begin rig up. Mud Type: WT: VIS: PV: YP: FL: Solids: Temp: °F STANDARD ALASKA PRODUCTION Daily Drilling Report -- PRUDHOE BAY March 18, 1988 at 0600 hfs Rig: AUDI #3 Well: W-39 (33-21-11-12) AFE # 120636 AFE Amount: Current Amount: 0600 Depth: 280' Day: 0 24- Hour Ftg: 280' Water Used: 1300 Current Operation: Drilling 17-1/2" hole. Accept rig @ 0600 hours on 3/17/88. Mix mud. NU diverter. PU BHA. Spud well @ 0145 hours on 3/18/88. Drill 17-1/2" hole to 280'. Mud Type: Spud WT: 8.8 VIS: 330 PV: 12 YP: 76 FL: 15 Solids: 3 Temp' °F STANDARD ALASKA PRODUCTION Daily Drilling Report -- PRUDHOE BAY March 21, 1988 at 0600 hfs Rig: AUDI #3 Well: W-39 (33-21-11-12) AFE # 120636 AFE Amount: Current Amount: 0600 Depth: 2700' Day: 3 72- HourFtg: 2429' Water Used: 2600 Current Operation: Running 5" stab-in string to cement 13-3/8" casing. Drill to 2700' Run 13-3/8" casing. PU stab-in tool. TIH with 5" stab-in string. Mud Type: Spud WT: 10.1 VIS: 105 PV: 21 YP: 38 FL: 13.8 Solids: 10 Temp: °F STANDARD ALASKA PRODUCTION Daily Drilling Report -- PRUDHOE BAY March 22, 1988 at 0600 hrs Rig: AUDI #3 Well: W-39 (33-21-11-12) AFE # 120636 AFE Amount: Current Amount: 0600 Depth: 2700' Day: 4 24- Hour Ftg: Water Used: 1000 Current Operation: Testing BOPE. Cement 13-3/8" casing. ND diverter. NU BOPE. Test BOPE. Mud Type: Ligno WT: 9.7 VIS: 43 PV: 15 YP: 13 FL: 10.4 Solids: 5 Temp: °F STANDARD ALASKA PRODUCTION Daily Drilling Report -- PRUDItOE BAY March 23, 1988 at 0600 hrs Rig: AUDI #3 Well: W-39 (33-21-11-12) AFE # 120636 AFE Amount: Current Amount: 0600 Depth: 4100' Day: 5 24- Hour Ftg: 1400 Water Used: Current Operation: Drilling 12-1/4" hole. Test BOPE. PU BHA. Test casing to 3000 psi. Run leakoff test. Drill and survey 12-1/4" hole to 4100'. Mud Type: Ligno WT: 9.7+ VIS:38 PV: 16. YP: 11 FL: 15.8 S°lids:9 Temp: 64°F STANDARD ALASKA PRODUCTION Daily Drilling Report-- PRUDHOE BAY March 24, 1988 at 0600 hrs Rig: AUDI//3 Well' W-39 (33-21-11-12) AFE # 120636 AFE Amount: Current Amount: 0600 Depth: 4797' Day: 6 24- Hour Ftg: 697' Water Used: 1000 Current Operation: Trip for Dyna-Drill to kick off. Drill and survey 12-1/4" hole to 4797'. Mud Type: LSND WT: 9.7+ VIS:38 PV: 14 YP: 10 FL: 11.6 Solids:9 Temp' 68°F STANDARD ALASKA PRODUCTION Rig: AUDI#3 Well: W-39 (33-21-11-12) Daily Drilling Report -- PRUI)IIOE BAY March 25, 1988 at 0600 hfs AFE # 120636 AFE Amount: Current Amount: 0600 Depth: 5596' Day: 7 24- Hour Ftg: 799' "-Water Used: Current Operation: Dyna-Drilling 12-1/4" hole. PU Dyna-Drill for kickoff. Dyna-Drill 12-1/4" hole to 5596'. Mud Type: Ligno WT: 9.7 VIS:36 PV: 11 YP: 8 FL: 11 Solids: 8 Temp: 72°F STANDARD ALASKA PRODUCTION Daily Drilling Report -- PRUDHOE BAY March 28, 1988 at 0600 hrs Rig: AUDI #3 Well: W-39 (33-21-11-12) AFE # 120636 AFE Amount: Current Amount: 0600 Depth: Day: 72- Hour Ftg: Water Used: 7400' 10 1804' 2350 Current Operation: Drilling 12-1/4" hole. Drill and survey 12-1/4" hole to 7400'. Mud Type: Ligno WT: 10.1 VIS:38 PV: 18 YP: 12 FL:5.6 Solids: 11 Temp: 77°F STANDARD ALASKA PRODUCTION Daily Drilling Report -- PRUDHOE BAY March 29, 1988 at 0600 hrs Rig: AUDI #3 Well- W-39 (33-21-11-12) AFE # 120636 AFE Amount: Current Amount: 0600 Depth: 7877' Day: 11 24- Hour Ftg: 477' Water Used: 900 Current Operation: Dyna-Drilling 12-1/4" hole. Drill 12-1/4" hole to 7758'. POOH. PU Dyna-Drill. Dyna-Drill 12-1/4" hole to 7877'. Mud Type: Ligno WT: 10.1 VIS:38 PV: 17 YP: 12 FL:5.2 Solids: 10 Temp: 81°F STANDARD ALASKA PRODUCTION Daily Drilling Report -- PRUDHOE BAY March 30, 1988 at 0600 hfs Rig: AUDI//3 Well' W-39 (33-21-11-12) AFE # 120636 AFE Amount: Current Amount: 0600 Depth: 8161' Day: 12 .24- Hour Ftg: 307' Water Used: 600 Current Operation: Reaming out motor run. Dyna-Drill 12-1/4" hole to 8161'. LD motor. Test BOPE. TIH with bit. Mud Type: Ligno WT: 10.1 VIS:39 PV: 14 YP: 11 FL:5 Solids: 10 Temp' °F STANDARD ALASKA PRODUCTION Daily Drilling Report -- PRUDilOE BAY March 31, 1988 at 0600 hfs Rig: AUDI#3 Well: W-39 (33-21-11-12) AFE # 120636 AFE Amount: Current Amount: 0600 Depth: 8863' Day: 13 24- Hour Ftg: 702' "-- Water Used: 500 Current Operation: Trip for bit. Ream motor run. Drill & survey 12-1/4" hole to 8863'. Mud Type: Ligno WT: 10.2 VIS:39 PV: 14 YP: 8 FL: 4.8 Solids: 11 Temp: °F STANDARD ALASKA PRODUCTION Daily Drilling Report -- PRUDHOE BAY April 4, 1988 at 0600 hrs Rig: AUDI #3 Well: W-39 (33-21-11-12) AFE # 120636 AFE Amount: Current Amount: 0600 Depth: 9500' Day: 17 96- Hour Ftg: 637' Water Used: 2200 Current Operation: Drilling 8-1/2" hole. Drill and survey 12-1/4" hole to 9258'. Run and cement 9-5/8" casing. NU and test BOPE. Change out BHA. Drill 8-1/2" hole to 9500'. Mud Type: Ligno WT: 9.6 VIS: 37 PV: 13 YP: 8 FL: 7.4 Solids: 7 Temp: °F STANDARD ALASKA PRODUCTION Rig: AUDI #3 Well: W-39 (33-21-11-12) Daily Drilling Report -- PRUDHOE BAY April 5, 1988 at 0600 hrs AFE # 120636 AFE Amount: Current Amount: 0600 Depth: 9893' Day: 18 24- Hour Ftg: 393' Water Used: 500 Current Operation: Logging. Drill 8-1/2" hole to 9893'. Log. Mud Type: Ligno. WT: 9.8 VIS:39 PV: 14 YP:9 FL: 6.6 Solids: 8 Temp: °F STANDARD ALASKA PRODUCTION Daily Drilling Report-- PRUDHOE BAY April 6, 1988 at 0600 hrs Rig: AUDI#3 Well: W-39 (33-21-11-12) AFE # 120636 AFE Amount: Current Amount: 0600 Depth: Day: 24- Hour Ftg: Water Used: 9893' 19 Current Operation: Running 7" liner. Log. Make wiper trip. Run 7" liner. Mud Type: Ligno. WT: 9.7+ VIS:38 PV: 14 YP:9 FL: 6.8 Solids: 8 Temp: 82°F ST.~,N D,~ R D ALASKA PRODUCTION Daily Drilling Report-- PRUDHOE IIAY April 7, 1988 at 0600 hfs Rig: AUDI#3 Well: W-39(33-21-11-12) AFE # 120636 AFE Amount: Current Amount: 0600 Depth: 9893' Day: 20 24- Hour Ftg: Water Used: 400 Current Operation: Dressing of top of 7" liner. Run and cemented 7" liner. Dress off top of liner. Mud Type: Ligno. WT: 9.7+ VIS:39 PV: 15 YP: 10 FL:6.8 Solids:8 Temp: 70~F STANDARD ALASKA PRODUCTION Rig: AUDI #3 Well: W-39 (33-2I- 11-12) Daily Drilling Report -- PRUDHOE BAY April 8, 1988 at 0600 hrs AFE # 120636 AFE Amount: Current Amount: 0600 Depth: 9852' Day: 21 24- Hour Ftg: Water Used: 600 Current Operation: Injecting mud. Dress off top of liner. LD BHA. PU 8-1/2" BHA. Clean out and test liner. Mud Type: Lowlime WT: 9.3+ VIS: 34 PV: 6 YP: 8 FL: 16.4 Solids: 5 Temp: 78 °F STANDARD ALASKA PRODUCTION Rig: AUDI #3 Well: W-39 (33-21-11-12) Daily Drilling Report -- PRUDHOE BAY April 11, 1988 at 0600 hfs AFE # 120636 AFE Amount: Current Amount: 0600 Depth: 9852' Day: 24 72- Hour Ftg: Water Used: 1900 Current Operation: R/U to run "X" plug. Change over to 9.2 ppg salt water. RU and run CBT/CET/GR/CCL. Tag bottom @ 9851'. RU and perforate with wireline conveyed guns. Run 4-1/2" completion string. N/D BOP and N/U 4-1/2" tree. Test to 5000 psi. Mud Type: NaC1 WT: 9.6 VIS: PV: YP: FL: Solids: Temp: °F STANDARD ALASKA PRODUCTION Daily Drilling Report -- PRUDHOE BAY April 12, 1988 at 0600 hrs Rig: AUDI #3 Well: W-39 (33-21-11-12) AFE # 120636 AFE Amount: Current Amount: 0600 Depth: Day: 24- Hour Ftg: '"Water Used: 9852' 25 Current Operat!on: Moving to W-35. Set packer. Test annulus to 2500 psi. Displace annulus .with 9.6 ppg brine and tubing with diesel. Test tubing and annulus to 2500 psi with sliding sleeve closed. Released rig @ 0600 hours. Mud Type:- WT: VIS: PV: YP: FL: Solids: Temp: : ., I . Mr. Michael D. Martin StandardAK Production Company P.O. Box 196612 Anchorage, Alaska 99519-6612 May 26, 1988 Re: Our BOSS Gyroscopic Survey Job No. AK-BO-80033 Well: W-39 Prudhoe Bay, Alaska Survey Date: April 23, 1988 Operator: T. McGuire Mr. Martin: Please find enclosed the "Original" and sixteen (16) copies of our BOSS Gyroscopic Survey on the above well. Thank you for giving us this opportunity to be of service. Sincerely, NL SPERRY-SUN, INC. Ken Broussard Western Area Manager Enclosures Note: This is the corrected copy of the survey. NL Sperry. Sun/NL Industries, Inc. RO. Box 231649, Anchorage, Alaska 99523-1649 Tel. (907) 522-1737 ................................................................................................................. SPERRY~SUN_WELL_SURVEYING_COMPANY ANCHORAGE ALASKA STANDARD AK PRODUCTION CO. ~i:~i: W-39 ................................. :.COMPUTATION_DATE_ PRUDHOE BAY APRIL 25, 1988 ALASKA ........ VERT I'C'ALj'-~'~-~ IO'N C~'K~:Li'L-~'~'I~i' ALONG CLOSURE ___PAGE DATE OF SURVEY APRIL ...... BOSS ..._GYROSCOP. I C__SLIRVE~ JOB NUMBER AK-BO-80033 KELLY BUSHING ELEV. OPERATOR,.MCGUIRE .............. 91.13 FT. .......................................... TRUE ................. SUB-SEA MEAo _IRED VERT I CAL VERT I CAL DEPTH DEPTH DEPTH ........ o o'oo .................. '91. 100 100.00 8. 200 200.00 108. 300 300.00 208. 400 400.00 308. 500 500.00 408. 600 600.00 508. 700 700.00 608. 800 800.00 708. 900 900.00 80o. 1000 999.99 ........ 1100 .................... 1099.98 ....... 1200 1199.96 1300 1299.95 ................ 1400 ......... 1399.94 ....... 1500 1499.94 1600 1700 1699.93 1800 1799.93 190¢) 1°°q 9:3 2000 1999.93 2100 2099.93 2200 2199.93 2300 ~-,o~ 92 ~'~' 2400 2399.92 2308.79 2500 ~°~-~ .~.. ~2. 2408.79 2600 25~9.92 2508.79 2700 2699.92 2608.79 2800 2799.91 2708.78 2900 2899.91 2808.78 COLIRSE:.i ......... COLIRS~ ............ DOG,LEG .............................. TOTAL INCLINATION DIRECTION SEVERITY RECTANGULAR COORDINATES DEG MIN DEGREES 13 87 :: 87 87 87 87 87 90:3. :36 1008.85 : ' 1108..83 ::::: .0 :::::._,8 1208. 8~. · .DJ. i.~ :_,_ I VERTICAL DEG/1OO NORTH/SOUTH EAST/WEST SECTIO~') 0 ::. 0 N O. 0 E 0.00 0.00 ' 0.00 0 S 78 69 W 0 09 0.')'-' ' t..- :=-; O. ' '~' 0,:, W 0 :: 6 S 4,.~.~0 W · 0.o5 o 09 ,,g o...-~_ W 0 7 N 83.60 W 0.10 0.13 S 0.40 W 0 10 S 69.80 W 0.09 0.17 S 0.66 W 0 10 ........... $...5~,..6%w ................. 0.03 .................. 0.31 ..... s ................... 0,.94...w 0 6 S 51.39 W 0.08 ~ : ~ 8. L W 0.0~ 7 ~ ~-' ° ') '~ ~' ~' S 17. 0 W 0.11 0 ~ 1~ ~' 0 30 S 38.69 E 0.43 0 48 S 23.30 E 0.35 0 52 S_27. O_E 0..09 S 22. 0 E 0.12 ~. S: 13. ~¢]_. E : 0.":'"~ :: S 8.50 E ,0._07 O. 00 : .0.¢:,]'-' . 0.._.1..4 ..... O. '::'::: O. 34 O. 54 O' 72 · .0.90 · -., '7.~ 1.68 2.50 ,.:'::_,_63 : 4.87~ ~ ~ '.'~:6.16 _1 ._50,.E ..... 7-.3c~ ....... 0 44 '" .--, 1 1=' m . ._1 W 0 61 S 1 '-"-' m · .~:..-'~W 0.9.1 .... S 1.31 W 1.45.--.':' 1 . 09 W 2.45 S 0 ~'--' . . .'4 W '-'.78 S 0.10 E ~ '~'SS 0 77 E 6.70 S .' :1.24 E 8.05__S 1408.81 0 26 1 ~,o.~. · 80 0 24 ~.160o.80 __0 ~_1.~_ 1708.80 0 : 15. 1808.80 :i:.: 0 13 : 190:3.80 .......... 0__11 .......... 2008.80 0 17 2108.80 0 22 S 2.80 E 0.35 9.11 S 1.62 E S 12.80 E 0.08 9.84 S 1.72 E S ...... 7_,.39_W 0._15 10. 50__S ........ 1....76.. F S 10..80 W 0.10 11.03 S 1.67 E S 15.39 W 0.04 11.45 S 1.58 E S 0.50 E __.'_0 07 11 .q'-' ''~ 1 5:3 F S 35.19 W 0.17 12.20 S 1.38 E S 45.3.9 W 0.10 12.63 S 1.01 E 0 ........ 2.7,. ....S_58.:_.69 W O. 13 13.06. S ............. 0..44. E 0 20 S 50.19 W 0.13 1:3.46 S 0.12 W 0 19 S 73.80 W 0.14 . 1~'. · _-. 72 S 0.62 W 0 15 S 58.._19 W __ O. 10 13.92 .S; 1...08__W 0 22 S 53.69 W 0.11 14.2.: S 1 5.-: W 0 23 S 71 50 W O. 12 14 F,'-' m m ~ ~--. ~ .. ~ '_--I '-~ 1'7' W 0 21 ....... N.._86,50..W 9.06 ~.~.9.~ 10.22 10.65 1.1_..02 ...... 11.43 11.94 12.50 13.03 ~ 13.42 1~.73 14.15 14.58 SPERRY-SUN WELL SURVEYINO..COMPANY ......... PAGE ...... 2 :::: 'i~: , ANCHORAGE ALASKA STANDARD AK PROKfl_IL':TIL-1N F:n. ~ I]ATE~ OF ..~URVEY AFRIL Lo, ..~,o,~....~o ~ ~. W-39 ' LCOMPUTAT_I ON 2DATE ................................... .BOSS_. GYROSCOF' I C,.. SURVEY. PRUDHOE BAY APRIL 25, 1988 dOB NUMBER AK-BO-80033 ALASKA KELLY BUSHING ELEV. = 91.13 FT. ......................... OPERATOR-MCGU I RE VERTICAL SECTION CALCULATED ALONG :CLosL;RE ' TRUE SUB-SEA :~:~ ~ ~cOURsE CnUR~E ' DOG-LEA~ _L TOTAL .... M-E~'SURED ................. VERTICAL VERTICAL INCLINATION DIRECTION :SEVERITY RECTANGULAR COORDINATES VERTICAL DEPTH DEPTH DEPTH DEG M I N DEGREES DEG/100 NORTH/SOUTH EAST/WEST SECT I 3000 2~'--; ......... 91 ~vo8 78 -:: 0 16 o ._.0.30 W 0 24 14 75 S ~._. W 15 0'~. · -.,r,,~o ~-'~'"~' 78 ' 0::15 ~ .-, .~o ........ -.91 S 49 ~15 46 c .... ,..o. .69 W 0.03 15.04 S ,~ .: .... o W 3100 3200 3199. 3300 3400 3399. 3500 349S;. 3600 3599. 3700 3699. 3800 .-~o,r, 3~00 ~o.r,o · ~1 ~ 4000 3~. 4100 409~. 4200 4 I~9.88 4300 42~. 4400 .........4399.87 4500 4499.87 4408.74 4600 45~9.87 4508.74 4700 4699.87 4800 4799.87 4708.74 4850 4849.85 4758.72 4900 4,3 ~ ~. 77 4808.64 4950 4949 59 . .,=,._ o. 46 5000 4999.27 4908.14 5050 5048.77 4957.64 51 O0 5098.02 5006.89 5150 5146. '~8 5055.86 5200 5195.70 5104.57 ...................... 5300 5292.09 5200.96 5350 =~ '- '- · _,._~ t~ ~. 60 5248.47 5400 5386 ._7 5295 44 91 3108.78 0 9 S 52.10 W 91 3208.78 0 11 S 21.69 W 91 3308.78 0 16 S 35.19 W 91 3408.78 0 7 ._-R 12.19 W 91 ~3._,0 .... 78 ~ 0 19 S 23.30 E 90 ~608.77 ~ :~i ~0 34 S 26.19 E 9(] .... 3708 77' 0 30' 46.~'.:2~' E 89 ~"--'r'A . ,:.o~.,.;. 76 0 42 S 46 80 E 89 :2':908.76 0 24 o"' 42 .69 E :38 4008,75 0___2.3__S 54., 69_E 0.09 0.10 O. 09 0.16 0.23 15.27 S 15.52 S 15.87 S Id.. 18 S 16.54 S 0.25 17.25 S 0.20 18.00 '"' O. 20 1:::. 73 S 0.30 19.42:3 0.09 ~¢~ '"'-' '-' 1... 4. (:.._, W 4.23 W 4..:--:S:._ W oO W 3.'P7 W 3._43_W 2.66 W 1.:-.96 W 1_._~44_ W_ : 1 16.03 16.47: 16.76 '. 17.09 17.6'.-.? 1:::. '.~8 18.78 19, 27 ..'/..._ti,-' ....... 4308,.,75 :: :. :':"0 :18 S 60.19 E__ 0 27 0 15 O~ 27 2~ 13 5 34 7 18 8 50 10 54 12 20 13 39 17 8 ........ 25. ~2.__S .............. 1._44_.E .......... " .... 24.66__ 0.07 S 56 .~.-. E O. 14 S 57. 0 E 0.19 ..... N_48._80._.,E__ ..... 0._26 ..... S 4 80 E O. == . %.1 S '2.69 W 3.55 S ..... O. 80_.W ................ 3.69_ S 3.'. 30 W 3.05 30.1°. S 1.28 E ,'o'~'~.76 S 4.19 W 3.45 35.71 ,..':' C).9. 1 E 34.26 S ..... 2..,69 W 3.. 1.1 42.72_S ,0._49_.E ........ ,41,._14 S 1.39 W 4.16 51.29 S 0.20 E 49.49 S 4.60 W 3.14 61 .3:4 S O. 35-.._ W 59..::.."'.=, __ S 3.60._W ............2.68 .......... 72..56., S 1 15_._W _70.,39 S 0.10 W 3.61 99.10 S '1.91 W 96.22 19 10 S 1.89 W 4.19 114.67 S 2.20 W 111.34 20 ..... 54 ......... S ...... 3..1 O_ W .................... 3.58 ............... 1 128..07 ............ 31.79.E; ............. 2.'~5_ W 20.._94_S. _ _0.:07_ E 20.22; 1 21.29 S 0.63 E 20.. 21.63 S 1.15 E 20.5'~ ,21.67_S. 1 .... 42_E 20._57 22.00 S 1.54 E 20.85 23.17 S 1.51 E . 21.99 oPERRy~UN_WEL~._SURVEyING.._COMPANY ANCHORAGE ALASKA STANDARD AK PRODUCTION CO. W-39 .................................... COMPUTATION_DATE PRUDHOE BAY APRIL 25, 1988 ALASKA ........ ~-~-'i:~CAL'-'~CTIoN C:ALCULATED ALONG CLOSURE-- PAo E ....... DATE OF SURVEY APRIL 23, 1.988 BOSS GYROSCOPIC_SURVEY dOB NUMBER AK-BO-80033 KELLY BUSHING ELEV. = .91.13 FT. OPERATOR-MCGUIRE ................................. TRUE ................ SUB-SEA ....... COLIRSE_ COURSE DOG-LEG MEASURED VERTICAL VERTICAL INCLINATION DIRECTION SEVER[TV DEPTH DEPTH DEPTH DEG MIN DEGREES DEG/100 · J4._,) 54.~..95 5341.~° 8~ 22 52 S 3.1.9 W 3..94 TOTAL RECTANGULAR COORDINATES NORTH/SOUTH EAST/WEST VERTICAL SECT I P'-' ) · _,) 40 S :3 98 W 146 32 5500 5478.71 5387. M~ 24 3.9 S 1.3~ W 5550 5523.~.R° 5432.75 26 6 o~' O. 3.9 W 5600 5568 65 5477.=~ '- . ~ 26 45 S ~.30 W 5700 5657 55 5566.42 27 45 c' 1 0 W . ~I . ~,~ ~.0 5745.86 5A54.73_. 28 11 .-, 1 .8.9 W = ~ '~ 10 W 5.900 5833.80 ._,74~.67 28 40 S 6000 5920.83 582.9.70 30 1~ S 3.8~ W 6100 6006.26 ~915.1~ 32 16 S 4.~0 W 6200 60.90. o~'~c, ~.~99~. ~. 95 33 48 S 6.10 W 50 6081. 37 35 .9 o ~ 7. 6.9 W 04 6162 91 35 35 ~' 8._8~_.W ....... ~_.~ . . __'~ 57 6244.44 ! 35 10~ · S ~8.8.9 W 6300 6172. .................... 6400 .......... _o= 6500 6335. 6600 6417. ..................... 6700 ........ 6500. 6800 65:_--:4. 6.900 6668. 7000 6754. 71 O0 ' '~"9 0.~ ._~.. 7200;. 6.924. 70 o. 7,'~00 7096. 7~.~0: 7181. _7~,'00 ~._ .. 7267. ~i)O: ' 7353. ~0 7437. 7.900 7520. 8000 7605. 8100 76.90. 8200 7775. · 3.84 3.00 2.15 1.16 0.62 0.74 1.70 2.01 1.69 1.6:_--: ._77 0.41 74. 6326.61 75 ......... 640.9.62__ 54 6493.41 .96 6577.84 00 6662.87 45 6748.32 .96 6833.84 33 28 32 3.9 32 .9 · :,1 20 31 15 31 11 170.~,4 S 4.78 W 191 9X-.. "-'- ..... --. 5.11 W 214.21 S 5.64 W '-'=.~ . ~:~ S 6. '- ~ -"._.P '-'- Y._, W ~:OA 87 S o .... . .................... ~,. 14_W .............. S '.9.3.9 W 0..92 736.60 S S 10.3.9 W 0.9.~ 791.?,'~ S S 11.50 W 1.02 845.10 S S 13.3.9 W 1.13 8.97.43 S S 14.1.9 W 0..92 ........948.53 S S 15.60 W 0.73 .9.98.73 S S 16.60 W 0.52 1048.52 S o<,4.44._-'R 10. 2~ W 403.57 S 13.23 W 455 37 ~' ....... .=. 17 .... 1 ,-q _. W 509.64 S 22. :S'7 W 565. :34 '-' - - .:, '..,'-x. 1.9 W 623.1'-' _. _ ._-, S 37,..~O W 680.3~ S 46.41 W 55.46 W 165. I .76 86 208 252..94 2~8._54 :_--:45.03 39S:. -'::_.,o 4_4-4._oo. ....... 49:--:. 10 554.15 611.64~ 66.9. ~'~ 725. 65..05__W ..... ,__ 781..~n ...... 75.40 W 86.95 W 889.40 .99.50 W ~42.~01 112.85 W .9.93..95 127.23 W 1045.77 54 691.9.41 07 7004.95 71 70.90.58 4.9 7176.36 11 7261..98 11 7345.98 54 742.9.41 41 7514 54 75.99.41 40 .......... 7684.27 31 7 31 16 30 54 30__56__ 31 16 34 ~z 32 28 31 ~' '31 53 ........ 31~_58 ............ S..14 .... S_lT. 1.?.W ............ O. 32 ........... 10.98.03 __S ........ 142.27_ W ........... S 18.60 W 0.74 1147..':--,'2' S 158.19. W 1149.22 S 20.60 W 1.09 11.95.96 S 175.51 W 1200.68 S 22.60 W 1.03 ........1243.75 S 1.94..42_.W ........... 125.1 73~ S 24 10 W 0.84 1291 18 ¢' 214 9o W "'-"]'-' '-'" w ...,., . . . .l.,_~t,..-'. ,",~'!' S 22.60 W 3.25~ 1340..97 S .-° '--' A._, _. 37 W zo._o."".=,' 50 S 20..60_W 2.24 13.92._1.9..._S ......... 256.67 W 141_1_.22 =' 17. 0 W 2.19 1442.22 S 273.73 W 1463..96 S 15. 0 W . 1.17 14.92.65 S 288.19 W 1516.41 0 W ............. O. 54 ............ 1543.87..::-; .................... 301.4._, W -) -) STANDARD AK PRODUCTION CO. W-39 PRUDHOE BAY ALASKA SPERR¥_-.SUN_WELL_SURVEY I NG _COMPANY ANCHORAGE ALASKA __.60MPUTAT_I ON_.DATE ......... --_~ APRIL 25, 1988 ...... VE~:I~i'~L'--SiECi~'ION CALCULATED ALONG CLOSURE DATE OFoURVEY'~ ' APR'I L Lc.'7'-', 1''P8,=,'--"' '~ "' :'"': BOSS._GYROSCOP I C'_SURVEY.. dOB NUMBER KELLY BUSHING ELEV. = t~1.13 FT. OPERATOR-MCGU I RE TRUE SUB-SEA ............ COLIRSE_~_COURSE .................. DOG-LEG .................................... TOTAL ...... : ..... MEA~'IIRED ........... VERTICAL ........ VERTICAL INCLINATION DIRECTION SEVERITY RECTANGULAR COORDINATES DEPTH DEPTH DEPTH BEG MIN DEGREES BEG/100 NORTH/SOUTH EAST/WEST VERTICAL .=.300 7860. O0 7768. 8400 7944. 8500 8027. 8600 8111. 8700 8195. 8800 8277. 8900 8359. 69 ................ 7936.56 :':.: '33 22 :: S'16_..80_W 40 8020.27 32 ~- ~' · _,~-~ ~=. 18.10 W 02 8103.89 33 34 S 19.60 W ~' 86.58 34 51 71 .............. ,_~ 1 ....... S_21_,._(LW __ 69 8268' 56::.:::35 O: :: S::21-60:W 0.61 1595.52 S 0,97:.1647.74 S 0.50~: ..... 1700.34_S ......... 0.83 1752.52 S 1.03 1804.42 S 1,,~1 .... 1857 14_S 0.37 ' 1910.49 S 9000 8441. 9100 8523. 9162 8574. 9200 8606. 9300 8688. 9400 8772. 9500 8856. 9600 8941. 9700 9026. 9800 9111. 9893 ~171. 75 8432,.62 :::: 34 :::::: 40:-:: 25 21 55 8765.42. :" ~. ~ 6 · ~,=, 8935.1~, = 63 9020.50 23 ~100.10 S 22-10 W 0.29 S,23...~1.0-W ............ O. ~'~_ ,c-:4:~2.72 34 18 S 24 30 W 1 "'= 8515.12 34 16 S 25. 0 W 1.04 8597.77 34::: !_4 ~ S ~25~,_80_W___0,45 8681-0.9 32~ 53 ~ S 26.30 W ~ 1.38 1963.68S 2016.38_S ......... 2048.52 S 2067.98 S .... 2118..83.._S .... 2168.50 S S 26.::0 W :. 0.80 · 2216.73 S : 31__58 ::::::: =S_25- 39 W ..... .: ..... 0..~4 ...... 2264.54._ S .......... 31 40 S 24.80 W 0.44 2312.29 S 31 8 S 23.60 W 0.82 2359.81S 31 8 ~ 23. A0 W 0. o2 '~o~ 88 S HORIZONTAL DISPLACEMENT = 2488.47 314.65 W 1622.62 · -.! . -, : .,2~,..99 W 1676.76: 344 ._47__ W, ' '-"~" 360.87 W 1786.24 . R ~..~, :37:E: 59 W 1.- 40.' ~ .,_-, - . * "]~'~'" 04 41:~ 91 W : z .. ,-,.:,. '-' 440 24 W :.~.~10.74 .. ,z -:¢ ' -'] C) /-. '7 "4 4 =,~.. 1_7__W£.!: __= ......... ._ -. 476 '-'::: W 21 "-' 0..-. 01 4o,.,. 21 W 211z:~:. 11 .... 533.6:3 W 22:32.74 557:31 W ::228~ 4.5 t I . . ~"~F~..;32_ W~__-- 23:37_._.5:=,* 6(.')2.69 W '.---'38:~., 624.05 W 2440. _ 643,30_. W .... 2488 FEET AT AOUTH~_ 14 DEG. 58 MIN. WEST AT MD = om'~'~..~..o SPERRY-ALIN WELL SURVEYING COMPANY . ANCHORAGE ALASKA STANDARD AK PRODUCTION CO. ~ : , ... . ' W-39 .................................................................. :_.i .............. .:__.i_ '____.COMPLITAiJON "_DATE PRUDHOE BAY APRIL 25, 19mm ALASKA : '~ "~ 1988 : DATE OF::SLIRVEY APRIL .,,:~, dOB NUMBER AK-B0-80033 KELLY BUSHING ELEV. = OPERATOR-MCGUIRE _. 91.13 FT. INTERPOLATED VALUES FOR EVEN 1000 FEET OF MEASURED DEPTH TRUE SUB-SEA TOTAL MEASURED VERTICAL VERTICAL RECTANGULAR COORDINATES MD-TVD VERTICAL DEPTH DEPTH ..................... DEPTH ....... NORTH/SOUTH EAST/WEST .... DIFFERENCE ....... CORRECTION 0 0.00 -91.13 1000 ~ 99 ........... 908 ....6 2;]00 1999 93 1~^° 80 3000 2999.91 2908.78 4000 3Y~.89 3908.76 5000 4y~.27 4908.14 6000 5920 83 58~P.70 7000 6754.00 6662.87 8000 7605.41 7514.28 9000 8441.64 8350.51 9893 ............ 9191.23 ......... 9100.10,., O. O0 O. O0 0. O0 2.45 S 0.53__W 0.01 ...................... 0.01 11.82 S 1.5:3 E 0.07 0.06 14.75 S 3.2:-: W 0.0~ 0.02 19._42....S 1.96 ~..W ......................... 0 ..... 11 ............................ O. 02 35.71 S 0..~1 E 0.73 0.62 403.57 S 13.23 W 79.17 78.44 948._53_S 99.50_ W ...................... 246. O0 ................... 166.83 1442.22 S 273.7:3 W :394.5:-] 14:::. 5:-] 1 .c763.68 S 440.24 W 558.36 163.77 2403,_88._S __643,,30~ W 701.~77 143...41 THE CALCULATION PROCEDURES ARE BASED:ON:THE USE:OF THREE DIMENSIONAL RADILIS OF" cURVATURE METHOD. oPERRY~oUN_..WEL~_oURVEYING_COMPANY ................................................................. PAGE .... STANDARD AK PRODUCTION CO. W-39 PRUDHOE BAY ALASKA ANCHORAGE ALASKA COMPUTATION_DATE APRIL 25, 1988 DATE OF SURVEY APRIL dOB NUMBER AK-BO-80033 KELLY BLISHING ELEV. = _ OF'ERATOR-MCGU I RE 91.1L:: FT. INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH TRUE SUB-SEA MEASURED VERTICAL VERTICAL DEPTH DEPTH DEPTH TOTAL RECTANGULAR COORDINATES MD-TVD VERTICAL ..... NORTH/SOUTH EAST/WEST ....... DIFFERENCE ............ CORRECTION 0 0,00 ~1 ~1.13 191 191.13 291 291.13 391 391.13 491 491.13 591 591.13 691 691 791 791 891 891 ....................... 991 991 1091 1091 1191 1191 1291 1291 1391 1391 1491 1491 1591 1591 1691 1691 1791 1791 .13 700.00 0.88 S .13 800.00 1.o9 S . 13 __ 900. O0 ......... 2.:$.3 S -91.13 O. O0 O. O0 0.00 0.01 S 0.06 W 100.00 0.08 S 0.21 W 200. O0 O. 13 S O. ~,o~'~' W 300.00 0.16 S 0,...63_W 400-00. '.': : · 0.29 S '.' 0.92 W 500, O0 :':':: .'" 0.4.'3:'-':S 1,14 W · :. 1.23 W 1.30 W 1.14 W 0,_58_W 0. O0 0. O0 O. O0 0. O0 0. O0 O. O0 O. O0 0. O0 0..00 · O. 00 O. O0 0. O0 0.00 0,00 __ _:. 0.00 0. O0 0. O0 0. O0 0. O0 0.01 ~_0._01 13 1000. O0 :::':: :::':: ~' . : :::: -: ~.66 S · 0.04 E 0.02 .1:3 1100. O0 .: :::: :::::.:::::::::::::? :::: ,5.11 S O. 71 E O. 03 · 13 ........ 1200,..00 6.,_5~2S 1_..21 E ........ --0.05 · 1 :--: 1300. O0 7.9:3 S 1.48 E 0.06 1~: 1400.00 9.04 S 1.62 E 0.06 .. 13 ........... 1500 ,_00 ~,._7..8_S 1.70._.E O. 07__ · 13 1600.00 10.44 S 1.76 E 0.07 .13 1700.00 10.99 S 1.68 E 0..07 0.01 0.01 0..01 0.01 0.01 0..00 __ O. O0 O. O0 ..................................................................................................... SPERRY.~SLIN_.WELL_SURVEYING...COMPANY ANCHORAGE ALASKA STANDARD AK PRODUCTION CO. .......... W-39 ............................. COMPUTAtION_DATE--__ F'RLIDHOE BAY APRIL 25, ,~o ALASKA ~F_'AGE7 ~_ DATE OF SURVEY APRIL ,_lOB NUMBER AK-BO-80033 KELLY BL.:,HING ELEV = OPERATOR-MCGU I RE 91.13 FT. INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH MEASURED DEPTH TRUE SUB-SEA TOTAL VERTICAL VERTICAL RECTANGULAR COORDINATES MD-TVD VERTICAL .DEPTH ................ DEPTH .........NORTH/SOUTH EAS~./WEST ......... DIFFERENCE ......... CORRECTION ~.~ 1,_,.-1.13 1800.00 11.41 S 1.59 E 0.07 0.00 1991 1991.13 1900.00 11.7~/ S 1.53 E 0.07 0.00 2091 2091.13 2000.00 12.16 S 1.41 E 0.07 0.00 ~'~¢'1 21~1 13 2100 O0 12.59 ~' · . . c, I (._, E 0.07 0 00 ~ ,~ I I 2291 2291 . 13 2200. O0 13.03 S 0._50_._ E ..................... O. 08 ................................ O. O0 ............ 2391 2391 13 23~0 O0 1S: 42 S O.r) ,.o W 0 08 O. i . i ~ ~ I .... ~')~' 0 · 2491 2491 1:3 2400 O0 13.71 S 0 57 W 0 -. 2591 2591 13 .......... 2500.00 1~ 90 S I 05 W 0 ~ ...................................... O. 2691 2691.13 ~600.00 14.2~3 3 1.49 W 0.08 0 2~s71 2791 13 2700 00 14 51 S 2 06 W 0.09 0. '~ ~t~ . . ........ . ........ ~.~. I 2891 13 2800 O0 14.62 S ~2.,..69_W 0..09 ......................... O, 2991 z;;~l 13 2900 O0 14,73 S 3 20 W 0.09 0 O0 3091 3091.13 3000.00: '.'.' ..:'15.02 S 3.55 W . 0.09 0.00 3191 m1~1 13 3100,00 ' 15 c'~ e .3.83_W O. 3291 :3291.1:3 3200. O0 15.49 S 4.02 W 0.09 O. 00 :3:391 3391.1s~c 3300.00 15.84 S 4.21 W 0.09 0.00 3491 ........ 3491.13 .......... 3400,00 16 .... 16_S 4..o.3_W 3591 3591.13 3500.00 16.50 S 4.~:2 W 0 09 0 O0 3691 3691.13 3600.00 17.17 S 4.01 W 0.10 0.00 O0 O0 O0 O0 O0 O0 PRUDHOE BAY ALASKA APRIL 25, 1~'~'' .~o8 dOB NUMBER AK-BO-80033 KELLY BUoHING ELEV. = 91.13 FT. OPERATORrMCGU I RE INTERPOLATED VA~UESiFOR EvEN 1O0 FEET OF SIIB-SEA DEPTH' ..................................................... TRuE MEASURED VERT I C:AL DEPTH DEPTH 3791 3791 3891 3891 3991 3991 4091 4091 4191 4191 4291 4291 4391 4391 4491 4491 4591 4591 4691 4691 4791 4791 4891 4891 4991 4991 5092 5091 5195 5191 5298 5291 5404 5391 5513 5491 5625 5591 SUB-SEA TOTAL VERTICAL RECTANOULAR COORDINATES MB-TVD VERTICAL ....... DEPTH ........ NORTH/SOUTH .......... EAST/WEST ......... DIFFERENCE .............. CORRECTION 13 . oo00.00 18.66 .13 o ~00. O0 1 .13 4000.00 19.84 .13 4100.00 20.23 .13 4200. O0 : 20' 60 .13 4300.00: ::!::i:ii:i: ::i :i 20.91 .13 4400.00 :::!i:~:i::: :: 21.25 .13 4500.00 21.60 .13 4600.00 21.69 ..13 ........... 4700.00 .13 4800- O0 :::::::: :i::25.30 .13 4~00- O0: ::: ::.J 34' 67 .13 .......... 5000. O0 ::::::::: 47~6_S .13 5100.00 71.45 .13 5'200.00' 98.81 .13 .......... 5300,._00 133,53_S lA 5400 O0 176.24 13 5500 O0 225.53 2.74 W 0.11 0.01 2.00 W 0.11 0.01 1.49 W 0.12 0.00 0. ~91 .... W 0. _12 ............................ 0., 00 · 0.39 W 0.12 0.00 · ~: 0.02 E 0.12 0.00 0.57 E O. 1~'o O.OO 1.12 E 0.13 A. O0 1.41 E 0.13 0.00 1.54._E 0 13 0..00 . 1.45 E 0.21 0.08 0.98 E 0.67 ' . 0.46 0..23__E ................ 1.86 1 .... 19. 1.08 W 4.17 2.31 1.91 W 7.86 3.70 .3.05_W 13..75. ._5.8~ .... 4.92 W 22.54 8.79 6.09 W 34.04 11.50 :SPERRY: SUNi_ WEL L~SUR VEY]' NO,._ COMP ANY STANDARD AK PRODUCTION CO. W-39 PRUDHOE BAY ALASKA COMPUTAT!ON_DATE, APRIL 25,1~'"~o8 INTERPOLATED VALUES FOR EVEN 100 FEET OF :~IIB-SEA DEPTH dOB NUMBER AK-BO-80033 KELLY BUSHING ELEV. = 91.13 FT. OPERATOR=MCAUI RE ............... TRLIE ~':,UB-~,EA¢' MEASURED VERT I CAL VERT I CAL DEPTH DEPTH DEPTH TOTAL RECTANGULAR COORDINATES MD-TVD VERTICAL NORTH/SOUTH EAST/WEST DIFFERENCE CORRECTION 5737 56~1.13 5851 5791.13 5965 5891.13 6082 .=,~9 . ,. ~,. I 13 6201 6091.13 6322 6191.13 6445 6291.13 6~, ='.7 6391 6688 6491. 6807 6591. 6926 6691. 7043 6791. 7160 6891. 7277 69:71. 73:'?4 7091. 7510 7191. .......... 7627 ..... 7291 . 7744 7391. 7865 7491. 5600. O0 277' 64 S ...... ._,7)0.00 ~:31 18 S 5800.00 386.25 S 5900.00 445.84 S ....... 6000.00 510,_34 S 6100.00 578.84 S 6200.00 64~.34 S .7- 26 W 46.82 12.78 9,,00_, W ....................... 60. -'6 13.44 12.05 W 74.46 14.21 16.38 W 90 97 16 ~1 22._,45_, W ................ 110.14 ............................... 1 .s-<, 16 30.95 W 131.66 21.52 = 22.81 41.56 W lo4.47 13 6300.00 13 6400.00 13 6500.00 o .......... 6600..00 13 6700.00 13 6800.00 13 6900.00 13 7000.00 13 7100.00 13 ..... 7200.00 13 7300.00 13 7400.00 718,...70:..S : 52-.50.._W 785.27o'-' 63.90 W 84.9.24 S 76.25 W 910,_??_S 90._18 W ::.: 970- 45: S 105.07 W .1028.89 ~' o ' :::.:.". 121.37 W 176.66 ............................ 22._19 1~7.34 20.68 216.70 19.36 235.05 252.34 17.29 269.32 16.98 10~6,.~_..S~' ~l ..... 138.80 .............................................................. W 286.20 16.87 1144.48 S 157 '~'~ . 1201.24 S 177.49 W ~'~19.85. 16.76 ,1,256...83_S ...!99.87_W ...... 336..4:3 .................... 16.59 ........... 1312 ~' ~. 224 46 W .~ ~' . ~._,.~.71 17.27 1374.67 S 250.09 W 374.01 20.:30 SPERRY-SUN _WELL_.SURVEY I NG ,_ COMPANY_ · ~ :~::~:: ANu. HORAGE ALAdKA STANDARD AK PRODUOTION ~ ~ ~ DATE uF .=,LIRVEY AFRIL ~._-,,~ 1.,,:,,_-,?~ ~ CO, : ! ~ ~ i~: ~:~OMPUTATION DATE 2:~~.:., :;~ : : ~ ~ W-39 ............... PRUDHOE BAY APRIL 25. 1'-' ~' '-''';, c, ,--, ,_lOB NUMBER AK-BO-80033 ALASKA KELLY BUSHING ELEV. = 91.13 FT. _OF'ERA TOR_.. MCGLI I RE INTERPOLATED:VALUES; FOR EVEN 100 FEET OF SUB-SEA DEPTH TRUE SUB-SEA TOTAL ¢-. I MEAoL RED VERT I CAL VERT I CAL RECTANGULAR COORD I NATES MD-TVD VERT I CAL · DEPTH DEPTH ................ DEPTH ....... NORTH/SOLITH ...... EAST/WEST ..... DIFFERENCE ............ CORRECTION 7983 75.91.13 7500. O0 8100 7691.13 7600. O0 8218 7791.13 7700. O0 8336 7891. 1 .:~: 7800. O0 m = 799 7900.00 ,= 4._,6 1.13 8575 8091.13 8000. O0 8695 8191.13 8100. O0 8816 8291.13 8200- O0 8938 8391.13 8300.00 9060 8491.13 8400.00 9181 8591.13 9302 8691.13 9422 8791.13 .... 9540 ....... 8891.13 ......... 8800. O0 9658 8991.1:3 8900. O0 9776 9091, 13 9000.00 .......... 9893 ..... 9191.23 ...........9100,_10 1433.89 S 1493.01 S 1553.40 S 1614.67 S 1677.30 S 356.79 W 377.72 W 401,_46 W 427. O1 W 453.32 W __480,.86_W :: 510.01:W 271.19 W 392.14 1~.14 288.:28_..W ............409.57 ..................... 17..42 303.81W 427.41 17.85 319.67. W 445 .77 18.'-'= o ~, .... ~37,53_W ........... 465..._10 1.9,.34.. 484.71 19.61 504.20 19.49 525.23 ....................... 21..03 1740.03 S 1801 ~ ~,6.~.87 S 1930.95 S 1995.63 S ....... 8500,...00 2058,.63 S 8600. O0 : 2120, 20 :S 8700. O0 :. :!::2179- 46 S 539.05 W 2236..23_S ........... 2292.60 S 593.59 W 2348.46 S 619.09 W 2403,.88_S ...... 643,.30_W__ 547.25 569.21 .590..57__ 611,57 631.40 649.69. 667.57 684.92 701..77 22.02 21.96 21 36_ 21.00· 19.82 18.29 17.88 17.35 __16.85 THE CALCULATION PROCEDURES USE A LINEAR INTERPOLATION BETWEEN THE NEAREST 20 FOOT MD. (FROM RADIUS OF..CURVATLIRE) POINTS ......................... SPERRY -SUN 5CRLE :- 1 INCH TO 500.00 / 500.0 PRUOHOE 8BT ~-~9 TBUE NOOTH STRNORRO RK PRODUCTION CO. RPBIL 23. 1988 -lObO. OD -sob. oD 0.00 O0 000.00 1500.00 000.00 9893 HOBiZONTCqL .2500. O0 PROJECTION SPERRT -SUN 0.00 5CRLE PRUOHOE RK-80-800S~ INCH TO 2000.00 / 2000.0 STRNORRD RK PflOOUCTION CO. RPRtL 23. t988 2000.00 4000.00 6000.00 8000.00 lO000. OOI 9{.91.23 ~9893 I 2000. O0 4000.00 VEl:IT T CFtL PROJECT _T ON Teleco Oilfield Sen ~ of Alaska Inc. 6116 Nielson Way Anchorage, AK 99502 (907) 562-2646 April 4, 1988 JOB #620 STANDARD ALASKA PRODUCTION CO. WELL: W-39 EILEEN WEST END RIG: AUD #3 Attached please find a copy of the compUter calculated MWD directional surveys for the above mentioned well. Teleco appreciates this opportunity to prOvide service to Standard Alaska Production Company. Teleco is committed to providing the highest quality MWD service and we would welcome any comments or questions concerning these surveys or any of our other services. Sincerely, Dave Reimer Field Service Supervisor DR/el Enclosures A ,~1~'1' COMPANY ~ompany: ~ell: ~ocation: ~ig: TELECO OILFIELD SERVICES JOB 620 SURVEY CALCULATIONS **************************************** STANDARD ALASKA PRODUCTION CO. W-39 ~ EIL~EN WEST END A.U.D.I. #3 i Date Page 04/02/88 ~ELECO Job # 620 TAK ;rid Correction: '~ ~agnetic Declination: ?otal Correction: ~roposed Direction: ~ 0.00 degrees 30.80 degrees 30.80 degrees 191.37 degrees RADIUS OF CURVATURE CALCULATION **************************************** MEAS DIRECTION TRUE VERTICAL COORDINATES CLOSURE DOG LEG DEPTH INCL AZ IMUTH BEARING VERT DEPTH SECTION N/S E/W DIST ANGLE SEVERITY feet deg deg deg/min feet feet feet feet feet deg deg/10 0 ' *************************************************************************************************** TIE IN TO GREATLAND SINGLE SHOT 4760.00 0.2 110.0 S 70 00 E 4759.00 12.42 18.16S 27.18E 32.68 S 56.252E 0.000 TELECO MWD SURVEYS 5054.00 9.1 182.3 4866.00 2.8 183.7 ~iS 03 42 W 4864.95 14.32 20.36S 28.61E 35.12 S 54.568E 2.585 ¢961.00 5.8 182.7 S 02 42 W 4959.67 21.37 27.47S 28.22E 39.38 S 45.769E 3.159 · S 02 18 W 5051.87 33.28 39.51S 27.69E 48.25 S 35.023E 3.549 5149.00 12.0 185.8 S 05 48 W 5145.26 50.53 56.86S 26.46E 62.72 S 24.959E 3.125 , 5243.00 15.1 183.0 ~ S 03 00 W 5236.63 72.38 78.818 24.77E 82.62 S 17.451E 3.370 TELECO Job # ~620 TAK 04/02/88 Page 2 MEAS DIRECTION TRUE VERTICAL COORDINATES CLOSURE DOG LEG DEPTH INCL AZIMUTH BEARING VERT DEPTH SECTION N/S E/W DIST ANGLE SEVERITY feet deg deg deg/min feet feet feet feet feet deg deg/100' **************************************************************************************************** · . , 5338.00 18.3 184.4S 04 24 W 5327.61 99.43 106.05S 23.01E 108.52 S 12.244E 3.395 5432.00 22.0 184.4!i S 04 24 W 5415.84 131.55 138.31S 20.54E 139.83 S 8.449E 3.936 5526.00 25.0 181.3 S 01 18 W 5502.04 168.61 175.74S 18.67E 176.73 S 6.067E 3.452 5637.00 27.2 181.6~ S 01 36 W 5601.71 216.71 224.56S 17.44E 225.23 S 4.1442E 1.986 · , 5767.00 27.9 183.0 ! S 03 00 W 5716.97 276.08 284.63S 15.03E 285.03 S 3.023E 0.734 5869.00 28.2 6016.00 30.4 6111.00 32.2 6212.00 33.4 6307.00 35.2 184.1 S 04 06 W 184.4 S 04 24 W 184.8 ~'S 04 48 W 186.9 !:S 06 54 W 188.3 ~S 08 18 W 6390.00 35.5 189.7 S 09 42 W 6491.00 35.1 189.0 6620.00 34.1 189.7 6747.00 33.0 190.8 5806.99 323.60 332.50S 12.05E 332.72 S 2.077E 0.587 5935.18 394.98 404.24S 6.72E 404.30 S 0.954E 1.500 6016.35 443.99 453.44S 2.77E 453.44 S 0.350E 1.907 6101.24 498.45 507.86S 2.80W 507.87 S 0.316W 1.637 6179.72 551.86 560.92S 9.88W 561.01 S 1.010W 2.069 6247.42 599.84 608 . 35S 17 . 39W 608 . 60 S 1. 638W 1. 041 S 09 00 W 6329.85 658.17 665.94S iS 09 42 W 6436.03 731.37 738.21S iS 10 48 W 6541.87 801.54 807.28S 6870.00 32.0 192.9 S 12 54 W 6998.00 31.4 7151.00 31.0 195.0 ' S 15 00 W 196.7 :~S 16 42 W 6645.61 867.62 871.95S 6754.51 934.81 937.23S 6885.38 1013.83 1013.47S 26.88W 666.48 S 2.311W 0.564 38.78W 739.23 S 3.007W 0.834 51.27W 808.91 S 3.634W 0.990 64.84W 874.36 S 4.253W 1.226 81.05W 940.72 S 4.943W 0.981 102.70W 1018.66 S 5.786W 0.632 TELECO Job # MEAS DEPTH INCL feet deg 620 TAK DIRECTION AZIMUTH BEARING 04/02/88 Page 3 TRUE VERTICAL COORDINATES CLOSURE DOG LEG VERT DEPTH SECTION N/S E/W DIST ANGLE SEVERITY degl deg/min feet feet feet feet feet deg deg/100' 7278.00 31.0 197.1 7434.00 30.9 199.9 7560.00 30.6 201.7 7684.00 31.2 204.5 7797.00 32.2 202.7 7891.00 32.5 7984.00 31.5 8078.00 31.8 8229.00 32.0 200.6 198.5 196.0 195.0 8354.00 32.7 196.4 8510.00 33.1 197.8 8666.00 33.0 200.6 3803.00 34.5 202.4 3941.00 34.7 203.1 )162.00 33.8 205.5 S 17 06 W 6994.24 1078.93 1076.05S c S 19 54 W 7128.03 1158.54 1152.13S S 21 42 W · ~, S 24 30 W 121.71W 1082.92 147.17W 1161.49 S 6.454W 0.162 S 7.279W 0.925 7236.32 1222.09 1212.35S 170.05W 1224.22 S 7.984W 0.768 7342.72 1284.43 1270.92S 195.03W 1285.80 S 8.724W 1.257 S 22 42 W 7438.86 1342.46 1325.33S S 20 36 W 7518.27 1391.95 1372.08S S 18 30 W S 16 00 W 218.80W 1343.27 237.35W 1392.46 S 9. 375W 1. 218 S 9.815W 1.237 7597.13 1440.72 1418.52S 253.84W 1441.05 S 10.146W 1.609 7677.15 1489.78 1465.62S 268.47W 1490.01 S 10.380W 1.432 289.79W 1569.50 S 15 00 W · S 16 24 W S 17 48 W 7805.35 1569.37 1542.51S 7910.95 1636.07 1606.90S 307.89W 1636.13 S 10.640W 0.374 S 10.847W 0.820 8041.93 1720.38 1687.89S 332.81W 1720.39 S 11.154W 0.551 360.79W 1804.66 388.68W 1879.67 ':S 20 36 W iS 22 24 W iS 23 06 W 'S 25 30 W 8172.68 1804.66 1768.23S 8286.59 1879.58 1839.04S 8400.18 1956.40 1911.31S 8582.86 2077.61 2024.66S 418.98W 1956.70 470.16W 2078.53 S 11.532W 0.981 S 11.934W 1.316 S 12.365W 0.323 S 13.074W 0.734 TELECO Oi i~i~l d S~rvi c~s VERTICAL PROJECTION 0 100D 2000 3000 4000 5000 6000 4.000 F- 5O0O 6000 7000 8000 90OO i 00o0 12000 19000 VERTICAL SECTION (~t) J 2000 6O0 TELECO 0 i 1 f i ~ 1 d S~rv PLAN VIEW 2O0 800 4130 4O0 400 800 1200 , I , ! ~/EST (~t) v 2400 2800 :9200 .,~ _ .i~' _ .9500 GREAT LAND DIRECTIONAL DRILLING INC. REPORT OF SUB-SURFACE DIRECTIONAL SURVEY STANDARD ALASKA F'RODUCTION COMPANY Ill; 0 I¥1 PA N Y WEL. L # W-Sg. ............................................................................................................................................................ WEST EILEEN ......................... .. ...... ,., ,,,, ,,., ,,. ,., .,,. ,,,, ,,,, ,,., ,,,,., .......... , ........................................... , .......................................................... L 0 C A T ill 0 N AL. 2;88D8 MWD I'ELECO SINGLE SHOT 4/07/88 ,J 0 li~ N U !vt i!~, E R T Y P E S L.I R V Iii. Y D A T E 400 FT 9162 FT 2;-15-88 4-02-88 J') A T E S U R V l!ii"~ .... l A !< liil N F:' R 0 l"l 'l" 0 THIS IS A RECORD OF A SUB-SURFACE SURVEY OF YOUR WELL WE HAVE RETAINED A COF'Y OF YOUR SURVEY REPORT IN OUR FILES FOR YOUR CONVENIENCE; HOWEVER, SHOULD YOU SO DESIRE, ALL COPIES OF I'HE SURVEY REPORT WILL BE FORWARDED TO YOU ON WRITTEN REQUEST. ALL SURVEYS ARE KEPT IN A LOCKED FILE AND ARE HELD IN STRICTEST CONFIDENCE. GREAT LAND D/RECI'IONAL DRILLING,INC STANE)ARD ALASKA PRODLtCTION CO. IWell RECORD OF SURVEY a~umed vertical to 0.0) RADIUS OF CURVAI:URE MWD TEL. ECO & SINGL. E SHOT 9E!. 0 f t MEAS DE P t' H 0 400 ?00 1230 1 '_", C) ..72) DRIFT DG MN 0 15 3O 0 TRUVERT SUBSEA SECT I ON D t RECT I ON DEF~ I'FI DEPTH D I ST ANGLE 0.00 -9J..99 0.00 N 0.00 E ~00.00 308.01 -0.32 N 80.00 E 899.99 808.00 -0.12 S SO.O0 E ].2!29.93 1137.94 3.64 S 25_00 E 1564.85 1472.8~ 1.0.02 S 10.00 E REL. AI'I VE COORDINAI'ES F:ROM WEL. L.--FIEAE} --. 0.00 N O.O0 E O.IS N 0.88 E 0.67 S 3.92 E S.20 S 7.40 E 12. iS S 9.S9 E CLOSLIRE DISTANCE DG MN S 0.00 N 0 0 0 E 0.87 N 80 0 0 E 3.98 S 80 :t. 912 E 9.04 S S4 S3 33 E 15.48 S 38 16 SS E DOG LEG de9 '"~0 0.000 0_0~ o. o ,o 0.303 0'.149 2080 2 S 46 302:0 o4ol 1. S 0 15 1Ed, 30 2079.82 1.9'87.83 ].S.OS S 20.00 E 254S fi2 24._,3.83 1. .99 S 0 O0 E 2679.~_,~ 2587 ...... P, 3 16 lei S 45 01} E 30:I. 9.81 2927.82 15_69 N 2S.00 E 3430.80 3338.8I 13.i9 N ~0.00 E 17.S7 S II.04 E 18.S7 S 11.22 E 1.8.77 S '1.1.43 E 18 R'-: '-' 12 67 E 1.8.29 S 14.11 E O. 146 0 _ 0S4 O_ 187 0.00! O. 061 38;1.0 4290 · 4760 4866 4~61 0 30 iS 48 48 3809.77 37i.7.78 1J..S3 S 60.00 E 4289.73 4J. 97.74 14.52 S 40.00 E 4759.72 4667.73 14.70 N 70.00 E 4865_67 4773.68 IS. 73 S 3.70 W 4960_ 39. 4868 .40 ~_~_°'°. 78S :'o. 70 W 1. R_.. SO ,o"' 18 .61 E 19' S2 .~; '--'~ 413 E 20.2~ F:; 26.19 E 21. 69 '-' oo 09 E . --_] r_.L: _ 28.80 o'-' ~°~, .70 E 24.22 S SO 12 SO E 30.47 S SO 10 12! E 33.11 S S2 16 9 E 35.49 S S2 19 42 E 39.96 S 43 S2 43 E O_ 132 O. 104 O_ nS3 · 51 .. _..S~ S054 S149 S243 $338 S432 9 2.2 1S 18 6 0 6 1.8 0 SOS2. ,~.--R° 4960 .60 34 .69 S ='° .30 W S145.98 S053.99 SI.94 S S.80 W S237.3S 5145.36 73.79 S 3. O0 W ~.~U . ~ _ . _ 5416 56 S~.=4.57 132.81 o 4.40 W 40.85 S 27.17 E S8.1.9 S 2S.94 E 80. IS S 24.25 E 107.42 S 23.06 E 1.39.74 S 21.26 E 49.06 63.71 83.74 109.87 141.35 33 37 S'I.E 24 i 38 E 16 SO ii E 1.2 7 4 E 8 38 S6 E 3.S48 3.057 3.304 3.370 SS26 S637 S767 S869 6016 27 27 28 30 0 1.2 SS02.76 S410.77 169.87 S i. 30 W S602 43 ==1.0 z~4 217 97 ~ S717.69_ S626.70 ~_°~"'""~ , .34 S 3.00 W SAn7 71 ~-~'lS 72 324 86 S 4 I0 W 5935.~0 S8~3.~1 3%~.2~ S ~.~0 W 177. 17 S' 1.9.39 E ooc 9A ~' 18 16 E r...¢_.._~ . . _-I~ _ ~,_, 06 S. .74 E 3~,3.93 S ~.~? E ~gR 67 ~ ? ~ E 178.23 ,z.,zo. 7 I 286.49' 334.18 405.74 S 6 14 48E S 4 3S 37 E 3 9 1 E S 2 11 27 E 1 3 4 E o 245 1 _983 0. S88 O. 380 J.. 498 WES]' EILEEN ~ W-37 4/'07/88 MEAS FiR I F! ]'RUVE!R] '"' -"-' '^ _ ~UE',._o E,-,SEiCI I F}N DEP'f'H DF-; MN E)EP-fH DEP]'FI DI ST 61.11 32 1.2 ,~;017.07 S925.08 44S.2S 6212 374 24 610.1.. 96 6009.97 499.70 6'307 35 12! 6180.44 6088.45 553.12 67190 or"' -- ~_,.:.~. 30 6248.14 ,'-;1.56..1. B 60'1.. '1.0 6491. 35 eS 62!2,0. S7 62.38. S8 659.42 6620 34 6 6436.75 6344.76 732.63 6746 33 0 c'/:54 1.76 6449.77 802.25 6870 ;io 0 6646 33 o~=,4 34 868 87 6998 31 24 d;7~:q 24 ~'~'o ~?4~ OS 715;:I. 31 0 ~;aa6.11 675;'4.12 1015.07 727'8 3:1. 0 65'94..97 6907-!. 98 1080.17 ~--.~ . .~_ ~ ,--,.- ~..,. 743~ 30 54 ; i~,_,. ?6 ,' Odo. 7? '1.1S9.7? 7S60 30 3,_-_"; 7237.04 71.45. OS 122!3.32 '?'68;4 31 .1.2! 7343.44 72S1.45 .1.285.67 ¢,9, 32 12 7439.58 7347_59 17!43.69 78~i 32 30 7S1.8.99 7427. O0 13'_:-'/3.18 79'84 3]. 30 7S97 A6 "-,'=r-,c:: 87 I4~1 96 8078 '.--J1. 48 7677.88 758S.87 .1.4-91.02 822:9 -_.,.-'=-'-q 0 7806. . 07 7714 . 08 .1. S70 . 61 83S4 '-:"'--',_:,:_. 4,.2 791i.._':57 7817 . g8 lc-,......_. ,, -" o'-',-. :qO_ _ o,.._, 6 8042.6S 79S0.66 1721.61 86~,6 33 0 8.1.73.41 8081.42 I80S.8_9 880'o_ ~, ~.':i.a.. 30 8287 _ o.-:',~,,.. 8'1.-9S .33 1880 .81. 8941 34 42 8400.91 8308.92 1.9S7.63 .... 8491.. dO 2078.84 RECORD OF SURVEY D I REC l' I ON ANGLE S 4.80 W S 6.90 W ':'- 30 ._, 8. W S 9.70 W o O0W S 9.70 W S 10.80 W o 12.90 W S 1S.00 W ,.~ 16.70 W 17.I0 W 19.90 W 21.70 W 24.S0 W 22.70 W 20_ 60 W 18.S0 W 16.00 W 1S.O0 W 1~.40 W 17.80 W 20.60 W oo 40 W .I0 W 2S.50 W RELAT I VE COORID I NATES FROM WELL-HEAD 4S4.86 S 3.49 E S07.28. o¢' 2.07. W S62.3S S 9.17 W 609.77 S 16.68 W 667.36 :-7 26. '1.6 W CLOSURE DISTANCE DG MN S 4S4.87 S 0 26 20'E S09.29 S 0 14 7 W S62.42 S 0 S6 4 W 6.1.0.00 S I 34 2 W 667.88_ o~ 2 14 43 W 739.64 S 38.07 W 740_62 808. '1.6 S 50_46 W 809.74 873. T_'_' "' .~e-, ~ 64. '1.4 W 87S. 711. 938.64 S 80.BE; W 942.07 :1.014. . ,_,°°,_., ,--._, :1.02! .... 00. W 10].9' 9,,'p 1077.46 :u: 121.01. W 1084.24 11S3.S4 S 146.47 W 1.162.80 :1.213 76 ~ :169 34 W ~oo_.q S2 1272.' ..... 194 °E' · ~.d .~ .~, . W ].287.08 o~.7.4 S 218.09 W 1344.S4 1373.48 S 236.6S W 1393.72 1419.92 S 2S3.14 W 1442.3.1. 1467.02 S 267.77 W 1491.26 IS43.91 S 289.09 W 1S70.7S 1608.30 S 307.19 W 1637.38 1689.2!9 S 332.10 W 1721.63 1769.63 S 360.08 W 1805.89 1840_44 S 387.97 W 1880.89 1912.71 S 4:1.8.28 W I~=7.~, .9.1.. 2026.06 S 469.46 W 2079.73 2 S6 46 W o 334 21W ~.--. 4 12! 0 W · -_,4 SR '74 S S 44 21 W 6 24 '-"-" ,::. :~ W 7 14 10 W 7 Sd 33 W 841 1W 9' 20 6 W S 9 46 34 W S 1.0 6 30 W S I0 20 38 W S 10 SS 20 W S 10 48 48 W .1.1 7 20 W 1I 30 SW :1.1 S4 14 W 1220 8W 13 2 4S W DOG LEG deq/lO0 1.89F" i. 34S I, 0 0.4S8 0.%94 0.9i.]. 0'.936 0.647 0.394 0.084 0.478 0.440 0.77Ei 0.994 0.720 0 ..~OE. 0. 648 0.371 0. S36 1. 173 0.2.1.9' 0 r- -~ ~,~ WEST EILEEN ~ W--39 DAI'A INI'ERP'OLATED FnR EVEN 100 FEET AF .=_IBoEA DEPTH 4/07/'88 MEAS. DEP TH .92 1.92 2.92 492 TRU VERT SUB SEA MD-I'VD VERT !CAL DEiPTH DEPTH D I FF. CORRECT 92 0 0 0 1_c,:-"2 1.00 0 0 '-:'~":' 200 0 392 306., 0 0 4-92 400 0 0 S72 S5'2 S 00 0 0 65'2 692 600 0 0 79'2 792 700 0 0 "- "-' 800 0 0 B_c; ,:. C J C.-f. 2 .... _: ..-- 'Y:Y2 c_~.... 00 O_ 0 -]. 0 _-5'2 1].92 1,-.9,_ 1 :q.o o 14.-°.2 iS92 1692 1792 1892 oo92 23-92 24~2 2s92 '--} '7 C.I 285'2 ]. 0¢'2 ]. 000 0 0 11.92 ].100 0 0 125'2 1200 0 0 lOOO 1300 0 0 14~2 1.400 0 0 1592 iSO0 0 0 1692 1600 0 0 175'2 1700 0 0 1892 1800 0 0 15'92 ].-900 0 0 o0oo o000 0 0 ~--~ ~ o-,~o oi00 0 0 2~? 2200 0 0 23-92 2300 0 0 2492 2~00 0 0 2592 2500 0 0 o~:9~ ~-' ~00 0 0 275'2 2700 0 0 2892 2800 0 0 25'92 25'00 0 0 REL.AT I VE COORD I I IAI FROM WELL-HEAD 0.04 N 0.01 W 0.16 N 0.12 W 0.24 N 0.40 W 0.17 N 0.82 W 0.26 N 1.28 E 0.48 lq 1..80 E 0.83 N 2.34 E ].30 N 2.8? E ]..91. N 3.42 E 1.28 S 4.7S E ':' 10 S 6 1S E o 98 S 8 10 E ~.- . . 6.61 S 8. I0 E 8 .-'o ~- 9 27 E I0.31 S 10.4~ E 12.61 S 9.67 E 14 13 ~ ~ 98 E o~ S 10.,._°9 E 16.38 S ].0.58 E 17.13 S I0.84 E 17.~2 S 11.06 E 17..97 S 11.21 E 18.22 S 11 . F44_ = c 18.38 S 11.45 E 18.45 S 11.52 E ].8.60 S 11.23 E 18.81 S ].1.46 E 18 99 ¢, 11 85 E ].8.94 S ].2.2!8 E ].8.66 S ].2.61 E WEST EILEEN N W-39 DATA I NIERPOLA-!ED FOR EVEN 100 FEET OF '-'lt'""'""-" _ ._-.o _ .o,.o =~-, DEPTH 4/'07/'88 MEAd. DEPI'H 3092 3_1.92 3492 35?2 3a.92 38_92 4092 4192 4o9o 4392 4492 4572 4692 48?2 4993 S094 S300 5406 SS14 S625 5738 t'-: 8c: i E, Pd]d ~ 082: TRU VERT SUB SEA MD-TVD VERTICAL DEt:~TH DEPTH D ! FF. CORRECT 3 ~-~,-:o 3000 0 0 2115)2 31. 00 0 0 o :':_)ce.o 3200 0 0 3392 7!300 0 0 ~',:,-," 92 3400 0 0 3592 3500 0 0 3692 BdO 0 0 0 3792 3700 0 0 .Z) ¢--.~ C,) '-z_~ '- O. 7.--!,_, 0 0 0 0 395?.? 3900 0 0 4092 4000 0 0 4192 4100 0 0 4292 4200 0 0 4392 4300 0 0 4492 4400 0 0 4592 4500 0 0 4S92 4gO0 0 0 4792 4700 0 0 4892 4800 0 0 4992 4900 i I S092 SO00 2 I S192 SIO0 4 = ~,~.00 8 4 S292 5392 S300 1.4 6 5492 S~O0 22 8 SS92 SS 00 33 I. 1 S692 Sd] 00 46 13 S79'2 S700 S? 1.3 S85'2 S800 74- !.E; S792 S.'5~ 00 ? 0 _1.~ RELAT I VE COORD I NATES FROM WELL-.HEAID 1.8.24 o'-' 12 .81 E 1.7.71 S 1.3.01 E 1.7.07 S 13.21 E 16.32 S 13.41 E 15.81 o~ 1.4.43 E 1.4.74 ~o"' 14 .77 E 1.3.41 S 14.75 E 11.98 S 14.25 E _,.o. 1.5S 19.82 E 16.77 S 21.19 E !.7 21 S oo 44 E IT.SO S 23.SS E 19.S3 S 23.41E 20.08 S 24.02 E 20.41 S 24.68 E 20.S1S 25.31E 20.42! S =~.°c 88 E 20.05 S 28.47 E 23.17 S 28.00 E 32.33 S 27_53 E 22.0.d9 S 1.8.S1 E 272.57 S 17.30 E 325_ S7 S 13.99) E 380.S~ S 9.51 E 439.41. o~' 4.73 E WEST EILEEN ~ W-39 DA}A INTERPOLATEEi FOR EVEN i00 FEEl' OF SUBSEA DEPTH 4/07/88 MEAS. TRU VERT SUB SEA MD-I'VD VERI'ICAL DEPTi4 DEPTH DEPTFI D I FF. CORRECT 6200 6092 6000 108 1.8 z ,-,--~ .... 12!9 6~ 44 ~2~2 o~: O 0 I S2 ~ ~:i q~:,5 ~392 ~300 174 o~ 6686 6492 6400 194 20 6806 6924 7041 7158 7275 73.5--':]. 7508 77:41. 7859 7977 8095 8212 8331 8450 8569 8688 8809 8930 9051 6r=m.o 6500 °14 20 6692 6600 232 ].8 6?'92 6700 249 17 6892 ~:;a 00 266 17 ....... :,~' 00 .... 17 7092 7000 ~_.°°q~. 16 7i92 7100 316 ].7 7292 7200 332 16 ,-,~. /300 ].7 7492 7400 367 18 ~9-~, ~,. = 7F;O0_ 385 18 7692 7600 403 18 775'2 7700 420 17 7892 7800 439 19 7992 7900 458 19 8092 8000 477 19 8~p 8~00 4~ 19 8292 8200 517 ~ o 1 8392 8300 ~ ~1. L 8492 84~0_ SS9 RELAT I VE C'OORD I NATES F:ROM WELL-HEAD E;02.94 S 0.23 S70.43 o 1.0.~3 640.47 S_ =°1_~oR 709.46 S 32.68 776.03 ~ 44.10 839.87 S 56.22 W 901.03 S 70.2"-5 W 960.25 S '86.05 W 101.8.26 S :1.03.01 W i.}~tr-- . f~ . O~'b 88 o 1.2:0 07 W 1133.38 S 11.89.09 S 1.244.33 S 1299_52 S 13~,, 47 . ~ 1.37.14 W 158.97 W 181.06 W 206.46 W 230.52 W 1416 49 ~' . ~ 1475 45 ~' 1S3S 43 ~' 1596.52 S 1658.15 S 2S 1.99 W 270. 17 W 286.81 W 302.63 W 321.45 W 1719.97 S 1781.07 S 1843.41 o ~ 1907.34 S 197 ~ 33 '-" 341_64 W 364. SS W 389.20 W 415.1! W 442.15 W WEST EILEEN # W-39 DATA INTERPOLATED FOR EVEN lO00 FEET OF MEASURED DEPTH 4/0'7/'88 MEAS_ TRU VERT SUB SEA DEPTH DEPTH DEPTH lO00 1000 .908 2000 2.000 1708 3000 3000 2?08 4000 4000 3.908 5000 4?9? 4_907 6000 q~,.o? c:,q 30 7000 67S7 ~665 8000 76 I. 1 7S 19 ?000 844? 83S7 RELATI VE COORDINATES FROM WELL-HEAD 1.34 S 4.84 E 17.18 S 10.8,4 F 18.63 S 12.63 E 16.81 S 2!1.27 E 33.21 S 27.S0 E 397.84 S 8.36 E 93~.64 S 80.82 W 1427 86 S oE . =¢S.77 W 1943.S8 S 431.24 W D · 5OO t000 tSO0 2000 2500 3000 3500 4000 4500 50OO 5500 6000 6500 7000 7500 8000 ~00 9000 -500 VERTICAL SECTION STANDARD ALASKA PRODUCTION CO. NEST EILEEN # N-39 SECTIDN AT S tt.37 N TVD SCALE' 1 inch = 1000 feet , . , DEP SCALE ' I inch = t000 feet DRAWN · 4/07/88 #a~ke~ Id~ttftr~m~ ~ lVO DEPR1 ~ SLI~ACE 0 0 0 ........ ~ TI) ~1.62 88il4 207g ,,, ,, , , \. 0 500 ~000 ~500 2000 2500 3000 3~00 4000 4500 5000 5500 Departure BI TI) ~t~ ~ ~79 HORIZONTAL VIEW STANDARD ALASKA PRODUCTION CO. HEST EILEEN # W-39 CLOSURE: 2080 ft S i3.0 H DECLINATION: 30.13 deg E SCALE: I inch = 350 feet DRAWN: 4/07/88 t75 i75 350 5~ 700 875 1050 t400 t575 t750 t925 aioo 2275 i050 I I i I I I I I , I ! I I I / , ! I '- I I t t I t I I t! l I ! l t // 875 700 525 350 175 0 t75 350 525 700 875 i050 BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage. Alaska 99519-6612 (907) ss~-5m TO: ARCO DATE:10/17/91 EXXON T#: 82930 PHILLIPS STATE OF ALASKA ARCHIVES SYSTEM Tape & Transmittal Only BP MAGNETIC LIS TAPE & L/STING ....... Enclosed is your copy of the matedal list~ed below. If. you have any questions, please contact BP Well Records at (907) 564-4004, ^ ...... ~ ......... - ..... :_ . ?e.~~'' ,~ , ...... W-37 .... CH/CN/GR/FIN ..-.. 07/01/91 '1600BP! .:_i .. AP1#50-029-21852 .' ...... W-39 CH/CN/GR/FiN' "07/17/91 1600BP!. ~i.~-:; AP1#50-029-21784 RECEIVED OCT £ ,-. Alaska Oil & Gas Cons, Commission Anchorage Information Control Well Records LR 2-1 Addan J. Martin BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 TO: DISTRIBUTION Date :07/26/91 T#:82667 FROM' Information Control Well Records LR2-1 SUBJECT: DP CASED HOLE FINALS Enclosed is your copy of the matedal listed below, if you have any questions, please contact BP Well Records at (907) 564-4445. W-09 PFC 07/17/91 #1 14560-15050 Atlas 5" W-39 CNL 07/17/91 #1 9200-9828 Atlas 5" Distribution: ARCO CHEVRON EXXON GEOSCIENCES MOBIL PHILLIPS RESERVOIR STATE OF ALASKA ARCHIVES STATE OF ALASKA AL,. ,A OIL AND GAS CONSERVATION COMMIS~. REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown Stimulate Plugging Perforate Pull tubing Alter casing 2. Name of Operator BP Exploration (Alaska) Inc, 3, Address P. O. Box 196612, Anchorage, Alaska 99519-6612 Repair well 5. Type of Well: Development X Exploratory Stratigraphic Service Other x 6. Datum elevation (DF or KB) KBE = 91.13 AMSL feet 7. Unit or Property name Prudhoe Bay Unit 4. Location of well at surface 1391' SNL, 1453' WEL, SEC. 21, T11N, R12E, UPM At top of productive interval 1696' NSL, 1999' WEL, SEC. 21, T11N, R12E, UPM At effective depth 1515' NSL, 2091' WEL, SEC. 21, T11N, R12E, UPM At total depth 1485' NSL, 2096' WEL, SEC. 21, T11N, R12E, UPM 12. Present well condition summary Total depth: measured 9893feet true vertical BKB 9191feet Effective depth: measured 9829feet true vertical BKB 9136feet 8. Well number W-39 (33-2 I- 11-12) PBU 9. Permit number/approval number 88-14/90-729 10. APl number 50- 029-21784 11. Field/Pool Prudhoe Oil Pool Plugs (measured) Junk (measured) fill at 9829' MD (01/89) Casing Length Size Cemented Structural -- Conductor 110 20 8 c.y. Surface 2642 13 3/8 3852 c.f. Intermediate 9211 9 5/8 1828 c.f. Production -- Liner 890 7 347 c.f. Perforation depth: measured 9602'-9620', 9636'-9646', 9656'-9672', 9682'-9691' Measured depth 146 2678 9247 9003-9893 True vertical depth BKB 146 2678 8645 8444-9191 true vertical subsea 8853'8928' (four intervals) Tubing (size, grade, and measured depth) 4 1/2" L-80 to 8878' with 4 1/2" tailpipe to 8982' Packers and SSSV (type and measured depth) 9 5/8" TlWpacker at 8876'; 4 1/2" assr at 2016' 13. Stimulation or cement squeeze summary see attachment Intervals treated (measured) RECEIVEDI F'FR 1 5 t991 Alaska 0il & Gas Cons, Go. Anchorage Treatment description including volumes used and final pressure 14. Re.oresentative Daily Average Production or Iniection Dat~, OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation Subsequent to operation 15. Attachments Copies of Logs and Surveys run Daily Report of Well Operations 1410 18638 0 0 930 10812 0 0 I16. Status of well classification as: Oil ~( Gas Suspended 2273 1894 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Si~lned ~,.~~7~ Title Supervisor Peripheral & EOA FOrm 10-404 Rev 06/15/88 Service Date ~l'~ {~l SUBMIT IN DUPLICATE WELL W-39(33-21-11-12~ PBU lrlflatable Brid_~e Plu_~ Procedure An inflatable BP was set in W-39 at 9647'MD to isolate the lower perfs. Depths referenced to BHCS (4/5/88). mtp 2/09/91 RECEIVED FEB 1,5 1991 Alaska Oil & Gas Cons. Com~t$~tot~ Anchorage 1, Type of Request: ' oo,,,,,,,,".?,,, 0 ir., APPLICATION FOR SUNDRY APPROVALS 2. Name of Operator BP Exploration (Alaska) Inc. 3. Address P. O. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at sUrface 1391' SNL, 1453' WEL, SEC. 21, T11N, R12E, UPM At top of productive interval 1696' NSL, 1999' WEL, SEC. 21, T11N, R12E, UPM At effective depth 1515' NSL, 2091' WEL, SEC. 21, T11N, R12E, UPM At total depth 1485' NSL, 2096' WEL, SEC. 21, T11N, R12E, UPM Abandon__ Suspend__ Operation Shutdown ~ Alter casing __ Repair well ~ Plugging __ Time extension ~ Change approved program ~ Pull tubing __ Variance __ Perforate 5, Type of Well: Development X Exploratory ~ Stratigraphic ~ Service 12, Present well condition summary Total depth: measured true vertical measured true vertical Length .. 9893 feet BKB 9191 feet 9829 feet BKB 9136 feet Re-enter suspended well~ Stimulate Other x 6, Datum elevation (DF or KB) KBE = 91,13 AMSL feet 7, Unit or Property name Prudhoe Bay Unit 8, Well number W-39 (33-21-11-12) PBU 9, Permit number 88-14 10, APl number 5O- 029-21784 11. Field/Pool Prudhoe Oil Pool Plugs (measured) Junk (measured) fill at 9829' MD (01/89) Size Cemented Measured depth Effective depth: Casing Structural Conductor Surface Intermediate Production Liner Perforation depth: 110 20 8 c.y. 146 2642 13 3/8 3852 c.f. 2678 9211 9 5/8 1828 c.f. 9247 .. 890 7 347 c.f. 9003-9893 measured 9602'-9620', 9636'-9646', 9656'-9672', 9682'-9691' true vertical subsea 8853'-8928' (four intervals) Tubing (size, grade, and measured depth) 4 1/2" L-80 to 8878' with 4 1/2" tailpipe to 8982' Packers and SSSV (type and measured depth) 9 5/8" TIW packer at 8876'; 4 1/2" SSSV at 2016' Description summary of proposal × Detailed operations program True vertical depth BKB 146 2678 8645 8444-9191 13, Attachments 14. Estimated date for commencing operation July 1990 16, If proposal was verbally approved Name of approver R. Douglas 7/23/90 RI; EIVED Date approved P - ? 1990 6as Cons. Coamissio' Anchorag 15. Status of well classification as: Oil X Gas~ Suspended ~ Service Commissioner 17, I hereby certify that the foregoing is true and correct to the best of my knowledge, Signed ~ ~"~ Title Supervisor Peripheral & EOA FOR COMMISSION USE ONLY Conditions of approval: Notify Commission so representative may witness Plug integrity ~ BOP Test~ J Mechanical Integrity Test~ Approved by order of the Commission Form 10-403 Rev 08/15/88 Location clearance Subsequ~pt form required 10-. ,.,~/.?~ ~, //~FF', ,- ORIGINAL SIGNED BY BOP sketch Date J Approval No~:~ 0 ~' Date SUBMIT IN TRIPLICATE Approved Return. eCl WELL W-39(33-21-11-121 PBU Inflatable Bridne Plun -- -- We propose to set an inflatable BP in W-39 at 9651'MD to isolate the lower perfs. Depths referenced to BHCS (4/5/88). The well is presently shut-in due to high GOR. It will be placed on production and tested. Verbal approval from R. Douglas 7/23/90 mtp 8/28/90 SEP - T ~0 Alaska Oit & Gas Cons. /~cbomge FLOW TUBES & PACKOFF BOWEN PA( :OFF HAND PUMP GREASE SEAL FLOWTUBE · FLOWLINE GREASE LINE RISER BOP GREASE MANIFOLD GREASE PUMP ~- GREASE RESERVOIR RECEIVED S EP - ? 19!t0 Alad~ 011 & Gas Cons. 6ommission Anehorag~ BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard RO. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 TO: ARCO CHEVRON EXXON TEXACO MOBIL PHILLIPS ARCHIVES DATE: 01/24/90 T#: 80810 BP FINAL DATA - PRESSURE SURVEY DATA Enclosed is your copy of the material listed below. If you have any questions, please contact BP Well Records at (907) 564-4445. D-27 BHP Pressure Report 01/10/90 Static Gradient Camco F-26 BHP Pressure Report 01/12/90 Static Gradient Camco G-08 BHP Pressure Report 01/06/90 Static Gradient Camco H-22 BHP Pressure Report 01/08/90 Static Gradient Camco J-01 BHP Pressure Report 01/10/90 Static Gradient Camco K-02A BHP Pressure Report 01/12/90 Static Gradient Camco K-03 BHP Pressure Report 01/02/90 Static Gradient Camco K-12 BHP Pressure Report : 01/13/90 Static Gradient Camco W-Il BHP Pressure Report 01/06/90 Static Gradient Camco W-39 BHP Pressure Report 01/11/90 Static Gradient Camco RE YED Information Control Well Records LR 2-1 J. Dietz/S. McCurry JAN 3 1 !990 Alaska 0il.~ 6as Cons. 60.mmiss]~ ~ch0rage BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 TO: HOUSTON ARCO CHEVRON EXXON TEXACO MOBIL ARCHIVES DATE: 11/29/89 TS: 80631 BP FINAL DATA - PRESSURE SURVEY DATA Enclosed is your copy of the material listed below. If you have any questions, please contact BP Well Records at (907) 564-4445. G-06 BHP Pressure Report 10/20/89 Camco W-04 BHP Pressure Report 11/15/89 Camco W-20 BHP Pressure Report 11/10/89 Camco W-39 BHP Pressure Report 11/08/89 Camco. Y-14 BHP Pressure Report 11/12/89 Camco Z-14 BHP Pressure Report 11/10/89 Camco Z-20 BHP Pressure Report 11/13/89 Camco DEC Bi[.& Gas Cons. Information Control Well Records LR 2-1 J. Dietz/S. McCurry BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 TO ARCO EXXON Date: 11/22/89 T#: 80625 SYSTEM Tape & Transmittal Only ARCHIVES BP MAGNETIC LIS TAPE'& LISTING Enclosed is your copy of the material listed below. If you have any questions, please contact BP Well Records at (907) 564-4445. W-39 CH/CN/MS 4 passes #1 11/10/89 9180-9850 ATLAS#4058 TP#06810 API#50-029-21784 1600bpi ~"'-~-~--~ **ARCHIVES ONLY: Information Control Well Records LR2-1 J. Dietz/S. McCurry BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard RO. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 To: Distribution Date: 11/16/89 Transmittal: 80598 From: Information Control Well Records LR2-1 Subject: BP CASED HOLE FINAL LOGS Enclosed is your copy of the material listed below. If you have any questions, please contact BP Well Records at (907) 564-4445. W-39 CNL GR 11/10/89 #1 9200-9828 Atlas 5" Distribution: ARCO CHEVRON EXXON GEOSCIENCES HOUSTON MOBIL PHILLIPS RESERVOIR Alaska Oil & Gas Cons. Commissi0~ Anchorage Standard Alaska ~ Production Company 900 East Benson Boulevara P.O. Box 196612 Anchorage, Alaska '99519-6612 (907) 561-5111 STANDARD ALASKA PRODUCTION January 31, 1989 Alaska 0il & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Attention: Mr. C. V. Chatterton Well W-39 (33-21-11-12) PBU Gentlemen: Enclosed, in duplicate, is Form 10-404, Report of Sundry Well Operations, for the above-named well. This contains our subsequent report of stimulating the well. Yours very truly, JAB:JAM Enclosures (4) L. Burke (MB12-1) Well Records (LR2-1) w/10 Well File J A Bragg/~'~~neerzng duct' ' ' A unit ot the original Standard Oil Company Founded in Cleveland, Ohio, in 1870. STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown Pull tubing 2. Name of Operator Standard Alaska Production Company 3. Address P. O. Box196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 1391' SNL, 1453' WEL, SEC. 21, T11N, R12E, UPM At top of productive interval 1696'NSL, 1999' WEL, SEC. 21, T11N, R12E, UPM At effective depth 1515' NSL, 2091' WEL, SEC. 21, T11N, R12E, UPM At total depth 1485' NSL, 2096' WEL, SEC. 21, T11N, R12E, UPM 12. present Well condition summary Total depth: measured true vertical BKB Effective depth: measured true vertical BKB Stimulate X Plugging Perforate Alter casing Repair well 5, Type of Well: Development Exploratory Stratigraphic Service Other 6. Datum elevation (DF or KB) KBE - 91.13 AMSL feet 7. Unit or Property name Prudhoe Bay Unit 8. Well number W-39 (33-21-11-12) PBU 9. Permit number/approval number 88-14 / 8-881 10. APl number 50- 029-21784 11. Field/Pool Prudhoe Oil Pool 9893feet 9191feet 9829feet 9136feet Plugs (measured) Junk (measured) fill at 9829' MD (01/89) Casing Length Size Structural -- Conductor 110 20 S u rf ace 2642 13 3/8 Intermediate 9211 9 5/8 Production -- Liner 890 Perforation depth: measured ' Cemented Measured depth True vertical depth BKB 146 146 2678 2678 9247 8645 8 c.y. 3852 c.f. 1828 c.f. 7 347 c.f. 9003-9893 9602'-9620', 9636'-9646', 9656'-9672', 9682'-9691' 8444-9191 true vertical subsea 8853'-8928' (four intervals) Tubing (size, grade, and measured depth) 4 1/2" L-80 to 8878' with 4 1/2" tailpipe to 8982' Packers and SSSV (type and measured depth) 9 5/8" TIWpacker at 8876'; 4 1/2" SSSV at 2016' 13, Stimulation or cement squeeze summary see attachment Intervals treated (measured) Treatment description including volumes used and final pressure 14. Re.oresentative Daily Average Production or Injection Data OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation Subsequent to operation 1950 3314 10 231 224O 3363 14 262 16. Status of well classification as: Oil X Gas Suspended 15, Attachments Copies of Logs and Surveys run Daily Report of Well Operations X 17, I hereby certify that the foregoing is true and correct to the best of my knowledge, Form 10-40'4J:iev 06/15/88 Service 458 538 SUBMIT IN [~UPLICA~E WELL W-39 (33-21-11-12~ PBU STIMULATION OPERATIONS A mud acid breakdown treatment was performed 12/3/88 on the following perforated intervals in Well W-39. 9602' -9620' MD BKB 9636' -9646' MD BKB 9656' -9672' MD BKB 9682' -9691' MD BKB Prior to the breakdown job a bullheaded HCl/xylene tubing wash was performed. The breakdown was performed as follows: a) c) d) 1000 gal. 15% HCI 2000 gal. 12%HC1 - 3% HF 750 gal. 15% HC12 1250 bbls. 15% HCI (dropped 210 7/8"OD 1.1 SG ballsealers evenly thoughout the fluid Steps a-d were repeated two more times, leaving balls out of the final stage, then the treatment fluids were displaced to within 10 bbls. of the top perforation with 95 bbls. dead crude. The well was surged three times to knock the balls off the perforations, then the well was returned to production and tested. jm 1/26/89 Standard Alaska Production Company 900 Eo$1 ~nson I~oule P.O. Bo. 196612 Anchorage. Alaska 99519.6612 (907) 564-§11 i INOEXED , ,, HOUSTON A~CO STANDARD CHEVRON ALASKA PRODUCTION E~ON Date: 01/25/89 TEXACO 7 9 7 6 9 TO: T~;: MOBIL pHILLIPS STATE OF ALASKA ARCHIVES REFERENCE: SAPC FINAL DATA - PRESSURE SURVEY DATA The following material Is being submitted herewith. Please acknowledge receipt by signing a copy of this letter and returning It to thls offlce: G- 11 Static Gradient 01 / 08 / 89 Camco M-04 Sta~c Gradient 01/16/89 Camco N- 15 Static Gradient 01 / 16 / 89 Camco N- 1 9 Static Gradient 01 / 14 / 89 Camco R- 1 3 Static Gradient 01 / 15 / 89 Camco S- 08 Sta~a Gradient 01 / 15 / 89 Camco W- 01 Flowing Gradient 01 / I 0 / 89 Camco W- 20 Flowing Gradient 12 / 28 / 88 Camco W- 27 Static Gradient 01 / 1 3 / 89 Camco W-34 Flowing Gradient 12/21/88 Camco W- 39 Sta~c Gradient 01 / 0. 9 / 89 Camco Y- 24 Sta~ic Gradient 01 / 17 / 89 Camco Y- 25 Static Gradient 12 / 30 / 88 Camco Z-20 Sta~c Gradient 12/30/88 Camco Received Date Jennifer Diaz INFORMAT1 ON CONTROL Wel I Records LR2-1 A unit ot Ihe or,g,nol Standard C~I Co,-po,~y Founded ,n Cleveland. Oh,o. in 1870 Standard Alaska Pf'o4~uction Compan/r 900 ~OSt 8en,,on t~Ouk .rd P.O. ~ 196612 Anchma~e. Alaska ~S 19~! 2 (~7) 564-511 I HOUSTON INDEXED ,,, ARCO CHEVRON E%2~ON TEXACO Date: 01-13-89 TO: biOBIL Tt: 79732 STANDARD ALASKA PP. ODUCTION PHILLIPS STATE OF ALASKA GEOSCIENCES RESERVOIR REFERENCE: ARCHIVES SAPC CASED HOLE FINAL LOGS The following material is being submitted herewith. Please acknowledge receipt by signing a copy of this letter and returning it to this office: A-16 INJ Profile #1 12-23-88 10550-11050 Camco 5" W-34 Prod-F #1 12-31-88 10500-10700 Camco 5" W-39 PITS #I 12-31-88 9400-9800 Camco 5" Y-25 GR/CCL #1 12-30-88 10000-11236 Camco 5" Z-20 PROD-F #1 12-27-88 11200-11539 Camco 5" Date A un't at the oncjmai Slanda~d O~1 Company Founded in Cleveland. Oh,o, ,n 1870. Shirley R. McCurry ~ NFORb~%Y I ON CONYROL We~ ~ Records LR2-~ INDEXED HOUSTON ARCO CHEVRON EXXON STANDARD . ALASKA PRODUCTION TEXACO Date: 12/13/88 TO: MOBIL PHILLIPS TI: 79628 STATE OF ALASKA GEOSC IENCES RESERVOIR REFERENCE: ARCHIVES SAPC CASED HOLE FINAL LOGS The following material'Is being submitted herewith. Please acknowledge receipt by signing a copy of this letter and returning It to thls offlce: '~N-09 R-14 ,R-14 W-37 39 ~Z-28 Completion Record 12/05/88 #I 11200-11602 Sch 5" CNL/GR 2/½ tool 12/09/88 #I 8800-9643 Sch 5" CCL-Plug Se~ting 12/07/88 #I 10025~10300 Sch 5" GR/PoSitRTTS Tool 12/06/88 #I 9975-10450 Sch 5" Prod 12/06/88 #I 9850-10206 Sch 5" Prod 12/07/88 #I .9500-9835 Sch 5" CET 12/08/88 #I 9165-10202 Sch 5" CBT 12/08/88 #I 9165-10181 Sch 5" Perf-R 12/07/88 #I 9200-10150 Sch 5" Race !ved Date Founded in Clevelo~d. Ohio. m 1870. Naska Oil & G~s Cons. Commission Anchorage Jennifer Dietz INFORMATI ON CONTROL Nel I Records LR2-1 P~'oduceion Compan~y P.O. ~. 196612 Anchoroge, AlosLo 99~ 19-6612 ARCO STANDARD ALASKA PRODUC 1'ION 12/07/88 EXXON DaLe: PHILLIPS T~: 79620 STATE OF AK SYSTEMJ '(Transmitta£ & Tape,) ARCHIVES REFRRINCE: SAPC }t/kGNETfC LIS TAPES & LISTINGS The following material is being subnitted herewith. Please acknowl ~e~g. e receipt by signing a copy of this letter and returning it to this office: W-35 W-39 CH/CNL 4 Pass 11/18/88 #I 9850-10573 Sch#7303 1600bpi API#50~029-21799 CH/CNL°4 Pass., 11/18/88 #I 9200-9835 Sch#73031 1600bpi API#50-029-21784 Tape Pos. #06214 Pos.#~06216 ARCHVIES ONLY: ~=~W._..~3~5 ............. CH .fi~d~to. pc... 11/18/g8 #! Tape Pos.~06215 Sch~73030 ..................... g00bpi API~50-029-21799 ........... ' ............. : W-39 CH find tape ~;/;~/gg ~I . Tape Pos..~062~7 Sch~73031 ~:,:~.:,:~.... :..: ' 800bpi APl~50-029-21784 ............... * EXXON: An Asterisk (*) next to a listing above means you should have received the Tape(s) and Listing(s) directly from the respective Jennifer Diaz INF~T1Y)N (I~Wn~OL Well Records LR2-1 Sl'anda,'d Alaska Producl~on Company 900 Eos! 0ansan ~ulevord A~chorage. Alaska {907j 564-5 ! I I HOUSTON ARCO CHEVRON EXXON TE¥~CO TO: MOBIL PHILLIPS STATE OF ALASKA GEOSCIENCES RESERVOIR REFERENCE: ARCHIVES SAPC ~ASED HOLE FINAL LOGS I NOEXED =, STANDARD ALASKA PRODUCTION Date: TI: 11-29-88 79589 The following material Is being submitted herewlth. Please acknowledge receipt by signing a copy of this letter and returning It to this office: W-35 W-39 F-17 U-13 B-06 CNL/-GR (2.5" Tool) 1L-18-88 #I 9850-10573 Sch 5" CNL/GR (2.5" Tool) 11-18-88 #i 9200-9835 Sch 5" PROD 11-18-88 #1 9400-11270 Sch 5" PROD 11-18-88 #2 10000-11342 Sch 5" Completion Record 11-20-88 #1 8890-9317 Sch 5" Received Date '" Anch0mge A un~! at the original Stonc/a,d O~1 Company Founded in Cleveland. Ohio. in 1870. Shirley R. McCurry I NFORMAT I ON CONTROL Wel I Records LR2-1 Standard Alaskc~ Product~'on Company 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 STANDARD ALASKA P ODUCTION November 21, 1988 Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Attention: Mr. C. V. Chatterton Well W-39'(33-21-11-12) PBU Gentlemen: Enclosed, in triplicate, is Form 10-403, Application for Sundry Approvals, for the above-named well. This contains our proposal to stimulate the well. Yours very truly, JAB:JAM Enclosures (9) cc: L. Burke (MB12-1) W-39 Well File /nA. Bragg /~ ager Production Engineering A unit of the original Standard Oil Company Founded in Cleveland, Ohio, in 1870. STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS 1. Type of Request: Abandon ~ Suspend ~ Operation Shutdown ~ Re-enter suspended well~ Alter casing ~ Repair well ~ Plugging __ Time extension ~ Stimulate X Change approved program ~ Pull tubing ~ Variance Perforate ~ Other ~ 2. Name of Operator Standard Alaska Production Company 3. Address P. O. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 1391' SNL, 1453' WEL, SEC. 21, T11N, R12E, UPM At top of productive interval 1696' NSL, 1999' WEL, SEC. 21, T11N, R12E, UPM At effective depth 1505' NSL, 2088' WEL, SEC. 21, T11N, R12E, UPM At total depth 1485' NSL, 2096' WEL, SEC. 21, T11N, R12E, UPM 12. Present well condition summary Total depth: measured true vertical Effective depth: Casing Structural Conductor Surface Intermediate Production Liner Perforation depth: measured true vertical Length .. measured 5. Type of Well: Development x Exploratory ~ Stratigraphic Service 9893 feet BKB 9191 feet 9852 feet BKB 9156 feet Plugs (measured) Junk (measured) Size Cemented 110 20 8 c.y. 2642 13 3/8 3852 c.f. 9211 9 5/8 1828 c.f. -. 890 7 347 c.f. 9602'-9620', 9636'-9646', 9656'-9672', 9682'-9691' 6. Datum elevation (DF or KB) KBE = 91.13 AMSL feet 7. Unit or Property name Prudhoe Bay Unit 8. Well number W-39 (33-21-11-12) PBU 9. Permit number 88-14 10. APl number 50- 029-21784 11. Field/Pool Prudhoe Oil Pool Measured depth 146 2678 9247 9003-9893 True vertical depth BKB 146 2678 8645 8444-9191 true vertical subsea 8853'-8928' (four intervals) Tubing (size, grade, and measured depth) 4 1/2" L-80 to 8878' with 4 1/2" tailpipe to 8982' Packers and SSSV (type and measured depth) 9 5/8" TIW packer at 8876'; 4 1/2" SSSV at 2016' '13. Attachments Description summary of proposal X Detailed operations program BOP sketch × 14. Estimated date for commencing operation November/December 1988 16. If proposal was verbally approved Oil X Gas ~ Name of approver Date approved Service 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. ~x'14'1.,~3~~ TitleManagerProductionEngineering Signed//_ FOR COMMISSION USE ONLY Condigns of apprOval: Notify Commission so representative may witness Plug integrity ~ BOP Test~ Location clearance ~ Mechanical Integrity Test~ Subsequent form required 10- ~ ~ 15. Status of well classification as: Suspended~ Approved by order of the Commission 0RIGII~AL SIGNED BY Form 10-403 Rev 06/15/88 LUNI'~JlE C, SMITH Commissioner ~,pp~ owd CapY IAppr°val N°' ,c~:'"- ~ oc~,/ ! / / SUBMII IN TRIPLICAIr: WI~LL W-39 (33-21-11-12~ PBU STIMULATION PROPOSAL A mud acid breakdown treatment is proposed for the following perforated intervals in Well W-39. 9602'- 9620' MD B KB 9636'- 9646' MD BKB 9656' - 9672' MD BKB 9682' - 9691' MD BKB Prior to the breakdown job a bullheaded HC1/xylene tubing wash will be performed. The breakdown will be performed as follows: a) b) c) d) 1000 gal. 15% HC1 2000 gal. 12%HC1 - 3% HF 750 gal. 15% HC12 1250 bbls. 15% HC1 (drop 210 7/8"OD 1.1 SG ballsealers evenly thoughout the fluid Repeat steps a-d two more times, leaving balls out of the final stage, then displace the treatment to within 10 bbls. of the top perforation with dead crude. The well will be surged three times to knock the balls off the perforations, then the well will be returned to production and tested. jm 11/18/88 Coiled Tubinflt glow-Ottt-Preventera Coiled Tub lng Pack-Ot~ Blind Rams Cutter Rams Chick:san (Kill Line) Slips Pipe Rams Pump-In Sub (Clrcula te/R o turn s) W ell Head Swab Valve Standard Ala$~.a - Productlon Company 900 Eo,~t Ben~on 8oule-ord PO Bo. 196612 Ancho~,oge. Alu,.ko 99519 6OI2 IQ07) 564.511 I I ND£X£D HOUSTON ARCO CHEVRON EXXON TEXACO STANDARD Date: 10-27-88 TO: MOBIL T#: 79473 PHILLIPS STATE OF ALASE. R GEOSCIENCES RES ERVOIR REFERENCE: ARCHIVES SAPC CASED HOLE FINAL LOGS The following material Is being submitted herewith. Please acknowledge receipt by signing a copy of this letter and returning It to this office: ~-14 '"' B-27 ~H-28 ~H-29 ~ M-02 ~M-06 ~'~M-12I ~ oc-2c ~ R-14 ~ W-39 CL/PERF 10-03-88 #1&2 11400-12160 Gearhart 5" CL/PERF 10-02-88 #1 10300-11000 Gearhart 5" CL/PERF 09-09-88 #1 10770-12266 Gearhart 5" CL/PERF 09-11-88 #I 9080-9600 Gearhart 5" CL/PERF 09-28-88 #1 1950-2200 Gearhart 5" CL/PERF 10-06-88 #1 10100-11700 Gearhart 5" CL 09-11-88 #1 8800-9180 Gearhart 5" CL/PERF 09-.-29-88 #1&5 3900-5840 Gearhart 5" CL 09-30-88 #1 9400-9700 Gearhart 5" CFS/TEMP 10-04-88 #1 .9375-9810 Gearhart 5" Rece i ved Da 'Ce Shirley R. McCurry I NFORMAT I ON CONTROL We I I Records LR2- I A un,! 011 ,he O,.g.nOj 51o,,do.lll C~J Co.'nl)(l,'~y Standard Alaska PK~uct~on Cc~npan~ 900 Eo~.t Ben.son Boulevu,d P.O. Be,, 196612 Anchorage. Alod~o ~S 19-6612 {907) 564-~ I ! I DALLAS ARCO CHEVRON EXXON TEXACO TO: MOBIL REFERENCE: PHILLIPS GEOSCIENCES RESERVOIR ARCHIVES SAPC CASED HOLE FINAL LOGS I NOEXED STANDARD ALASKA PRODUCTION Date: 07/20/88 TI: 79116 The follovlng materlal Is being submitted herevith. Please acknovledge receipt by signing a copy of thls letter and returnlng it to.this office: · B-9 C-28 H-14 H-17 M-5 M-i9 N-10 S-6 W-35 W-39 X-14 Z-6 Temp 06/29/88 #1 9600-10092 Camco Leak Detection 07/14/88 #1 '10-10010 " " " 07/14/88 #1 10-9540 " Production Profile 07/05/88 #2 10300-10848 Camco Leak ID/Temp/CCL 07/12/88 #2 Surf-12590 Camco Leak Detection/Flowing Temp 07/01/88 #1 10-9726 Flowing Temp ~07/01/88 #1 10-10550 Camco Step Rate M.I. Injection Profile Production Profile 07/07/88 #1 CR/CCL 07101/88 #1 GR/Collar 07/12/88 #1 OR/CCL 07/01/88 #1 - 1, It !1 5" 5" Camco 5"/2" 07/09/88 #1 9712-10500 10150-10425 Camco 5" 8600-9840 Camco 5" 10500-11541 Camco 5" 9200-10390 Camco 5" 2" Camco 5,I Rece I ved Date A unh ot the or~g~ol Slondo,d C)~I Compony Founded in Cleve|ond. Oh,o° ,n 1870 I NFORNAT I ON CONTROl. Alaska 0il & (]as Cons. Commission We l I Records LR2-1 Anchorage · Standard Alasl~a P~oduclion Compan/-'~' 900 Eo. Ben,,on Bou', .d P.O. Bo,, An(horoge. AIo~o 99519-661~ ~907l 564-5111 INOEXED DALLAS TO: ARCO CHEVRON EXXON TEXACO MOBIL STANDARD ALASKA PRODUC 1-1ON 07/13/88 Da te: 79086 T#: PHILLIPS STATE OF ALASKA ARCHIVES REFERENCE: SAPC FINAL DATA - PRESSURE SURVEY DATA The following material Is being submitted herewith. Please acknowledge receipt by signing a copy of this letter and returnlng it fo this office: · E-18 E-26 E-27 G-04 G-24 K-01 K-12 N-06 R-07I W-39 Y-05I Z-06 Flowing Gradient 06/23/88 Camco Static Gradient 06/26/88 Otis Static Gradient 06/24/88 Otis Static Gradient 07/02/88 Camco Static Gradient 06/24/88 Otis Static Gradient 06/26/88 Otis Static Gradient 07/02/88 Camco Static Gradient 06/23/88 Otis Static Gradient 06/20/88 Otis Static Gradient 07/01/88 Camco Static Gradient 06/21/88 Otis Static Gradient 07/01/88 Camco JUL Alaska Oil & ~s Co,0. Commissi0D Race I ved Date A un;t ol lhe or~gi~ol S,ondo,d O~I Compon~. Founded in Cle,,elond. C~o. ~n 1870 Jennifer Dietz INFO,MAT I ON CONTROt Wel I Records tR2-1 INDEXED DALLAS ARCO CHEVRON EXXON TO: TEXACO MARATHON MOBIL PHILLIPS STATE OF ALASKA GEOSCIENCES REFERENCE: S"i'AN DARD ALASKA PRODUCTION Date: 04/14/88 T#: 78727 SAPC OPEN HOLE FINAL LOGS The following material is being submitted herewith. Please acknowledge receipt by signing a copy of this letter and returning it to this office: DAL./UNIT/STATE: W-39 W-39 W-39 DIT~/SFn o4/o5/88 ¢/1 BflCS 04/05/88 #1 LDT/CNL po ~ro ~ 04/05/88 #1 6880-9890 Sch 5"/2" 6880-9858 Sch 5"/2" 9253-9897 Sch 5" STATE ONLY: .,,.'"q ..... . ~. ~ Di,,TR:~C ',.Ia gn e r/~ 5 ¢/S i~;/D i'r/~/ona ~;~ A unit Ot the o~,ginol S"ondo~d ~1 Co,*~po-y Founded ,.~ Cle.eiond Oh,o. ,n 1870 :TIONAL SURVEYS Da r_ e' Job#' Da t e' Job/! · Victor ia Aldridge INFORMATION CONTROL Well Records LR2-1 Office Correspondence STANDARD ALASKA PRODUCTION TO: Distribution DATE: June 3, 1988 FROM: jeanne L. Haas ................. cc NO: Senior Technical Assistant SUBJECT: Recomputed GCT Directional Survey for PBU Well W-39, Attached please find a recomputed GCT Directional Survey for ..... PBU Well W-39. The conductors'on the southwest well row of 'W- pad have been renumbered. As a result, changes to the kelly bushing elevation, surface location and X and Y coordinates have been made in the attached survey'. ............... J~nne L. Haas JLH/lm Standard Alaska Production Company 900 East Benson Boulevara P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 STANDARD ALASKA PRODUCTION May 26, 1988 Mr. C.V. Chatterton Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Attention: Mike Minder Re' W-39 (33-21-11-12), Application for Sundry Approval Attached is an Application for Sundry Approval for the above-referenced well. W-39 was drilled from a surface location approximately 35' away (one conductor over) than was approved in the Permit to Drill. Once this error was discovered, Mike Minder of your office was notified. SAPC regrets any inconvenience this has caused. Please direct additional questions to Jim Welch at 564-5840. TOS/J LW/I m Attachment Sincerely, T.O. Stagg PBU Drilling Engineering Supervisor A unit of the original Standard Oil Company Founded in Cleveland, Ohio, in 1870 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS 1. Type of Request: Abandon [] Suspend [] Operation Shutdown [] Time extension i~ Change approved program ~ Plugging [] Stimulate [] 2. Name of Operator Standard Alaska Production Company 3. Address P. O. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface (Corrected) 1391' FNL, 1453' FEL, SEC 21, T11N, R12E, UPM At top of productive interval At effective depth At total depth 11. Present well condition summary Total depth: measured Effective depth: true vertical measured true vertical Casing Length Structural Conductor 74' S u rface 2642' Intermediate 9211' Production Liner 890' Perforation depth: measured true vertical Re-enter suspended well [] Alter casing [] Pull tubing [] 9893 feet Plugs (measured) 9192 feet BKB 9852 feet Junk (measured) 9157 feet BKB Size Cemented 20" 13-3/8" 9 -5/8" Amend order [] Perforate [] Other [] 5. Datum elevation (DF or KB) KBE= 91.13 feet $. Unit or Property name Prudhoe Bay Unit 7. Well number W-39 (33-21-11-12) 8. Permit number 88-14 9. APl number 5 0 - 029-21784 0. Pool Prudhoe Oil Pool Measured depth BKB 110' 2678' 9247' 7" 9003'- 9893' (Subsea) 9602'-9620',9636'-9646', 9656'-9672', 9682'-9691' (Subsea) 8853 '-8868', 8881 '- 8890 ', 8898 '-8912', 8920 '-8928' True Vertical depth BKB 110' 2678' 8647' 8445' - 9192' Tubing (size, grade and measured depth) 4-1/2", 12.6~, L-80 with tailpipe to 8982'. Packers and SSSV (type and measured depth) 4-1/2" BV at 2016; at 9-5/8"x 4-1/2" Packer at 8878'. 12. Attachments Description summary of proposal [] Detailed operations program D BOP sketch [] 3. Estimated date for commencing operation N/A Sul)sequent Work Heportecl on 14. If proposal was verbally approved l~'om~ No. Dated~~~ Name of approver Date approved 15. I hereby ce_rtify?t~i'a)' the foregoing is true and correct to the best of my knowledge ~ .~l~Signed,_. _C~~////~~ TitlePBUDriilingEngineerSuperviSOrcommission Use Only Conditions of approval Approved by Form 10-403 Rev 12-1-85 Notify commission so representative may witness IApproval No. [] Plug integrity [] BOP Test I~! Location clearance I A--pprove~ Copy Ret~lm'ed ORIGINAL SIGNED BY ~'- ~, ~ LONNIE C. SMITH by order of Commissioner the commission Submit in triplicate ARC{) S'I'/IN D~R D EXXON Date: 04/19/88 PttlLLIPS TO: PDBY Systems (Transmittal Only) T#: 78738 SYSTEMS (Transmittal & Tape) ARCHIVES SAPC MAGNETIC LIS TAPES & LISTINGS The following material is being submitted herewith. Please acknowledge receipt by signing a copy of this letter and returning it to this office:  ~ OH EDIT Mag tape 04/05/88 ¥/I 6878.5-9905.33 Sch ~/72677 ~/0569 ~ ~':~' 1600bpi (DIL/BHC/LDT/CNL/MSFL/GR in CSG) Tape Pos. 3 Alas!(a Oi~ & Gas Cons. C0mmissi0rl A~chomfle : An Asterisk (*) next to a listing above means you should have received the Tape(s) and Listing(s) directly from the respective service company. Please confirm this. Received Da te Victoria Aldridge INFORMATION CI~X/IRDL Well Records LR2-1 A u,,b o~ the o,,g;nol 5'o,,do,d 0,! Compo,w Founded ,n Cle.eln,,d C~,o ,,, 1870 · INDEXED DALI.AS ARCO CHEVRON STANDARD , AL ASF~a, PRODUCTION E~XON TEXACO Date: 04/14/88 78729 TO: MOBIL T#: PHILLIPS STATE OF ALASKA GEOSCIENCES REFERENCE: SAPC CASED HOLE FINAL LOGS The following material is being submitted herewith. Please acknowledge receipt by signing a copy of this letter and returning It to this.office: C-30 D-22 H-3A J-3 J-3 M-3 N-2 W-39 X-24 X-24 Completion Record 04/06/88 #1 9197-9669 Sch 5" Production Profile 04/04/88 #1 9050-9390 Camco 5" CBT 04/10/88 #1 2243-8804 Sch 5" GR/Collar 04/07/88 #1 9300-10130 Camco 5" Completion Record 04/08/88 #1 9290-10080 Sch 5" CET 04/09/88 #1 9643-10912 Sch 5" Production 04/05/88 #1 10180-10400 Sch 5" CBT 04/09/88 #1 8990-9846 Sch 5" CET 04/09/88 #1 8990-9846 Sch 5" Perf. Record 04/10/88 #1 8900-9850 Sch 5" Injection Profile 04/07/88 #1 9100-9625 Camco 5" Injection Profile 04/09/88 #1 9100-9470 Camco 5" ~ShCe0ran~ C0mmJssl0 n ' Rece i red Date A unit ol the o,,9*nol Ston(llord C)d Coml;x~ny ~ounded ,n Cle.~'lond. C)~,o. ,,, 11170 Victoria Aldridge INFORMATION CONTROL Well Records tR2-1 February 9, 1988 Mr. Ted Stagg Prudhoe Bay Unit Drilling Emgineer Supervisor Standard Alaska Production Company P.O. Box 196612 Anchorage, Alaska 99519-6612 Telecopy: (907) 276-7542 Re: Prudhoe Bay Unit W-39 Standard Alaska Production Company Permit No. 88-14 Sur. Loc. 1426'SNL, 1454'WEL, Sec. 21, TllN, Ri2E, UM. Btmhole Loc. 3824'SNL, 1979'WEL, Sec. 21, TllN, R12E, IR~. Dear Mr. Stagg: Enclosed is the approved application for permit to drill the above referenced well. The permit to drill does not indemnify you from the probable need to obtain additional permits required by law from other governmental agencies prior to commencing operations at the well site. To aid us in scheduling field work, please notify this office 24 hours prior to commencing installation of the blowout prevention equipment so that a representative of the Commission may be present to witness testing of the equipment before the surface casing shoe is drilled. Where a diverter system is required, please also notify this office 24 hours prior to commencing equipment installation so that the Commission may witness testing before drilling below the shoe of the conductor pipe. ~~~~~_~_Ve · truly rs, ,~ pr C. V. Chatterton Chairman o f Alaska Oil and Gas Conservation Commission BY ORDER OF THE COmmISSION dlf Enclosure CC: Department of Fish & Game, Habitat Section w/o encl. Department of Environmental Conservation w/o encl. Mr. Doug L. Lowery STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION PERMIT TO DRILL 20 AAC 25.005 la. Type of work Drill [] Redrilll-Illb. Type of well. Exploratoryl"l Stratigraphic Testl-1 Development Oill~l Re-Entry [] DeepenI-11 Service [] Development Gas [] Single Zone [] Multiple Zone [] 2. Name of Operator 5. Datum Elevation (DF or KB) 10. Field and Pool Standard Alaska Production Company :F,.B~. = 92 feet Prudhoe Bay Field/Prudhoe 3. Address 6. Property Designation Bay Pool P. 0. Box 196612, Anchora.qe, Alaska 99519-6612 ADL 28263 4. Location of well at surface 7. Unit or property Name 11. Type Bond(see 20 AAC 25.025) 1426' SNL, 1454' WEL, Sec. 21, T11N, R12E Prudhoe Bay Unit At top of productive interval 8. Well number Number 3675' SNL, 1950' WEL, Sec. 21, T11N, R12E W-39 (33-21-I 1-12) KOO683449-G-14 At total depth 9. Approximate spud date Amount 3824'SNL, 1979' WEL, Sec. 21, T11N, R12E Feb. 15, 1988 $200,000.00 12. Distance to nearest 13. Distance to nearest well 14. Number of acres in propert~y 15. Proposed depth (MD and TVD) property line ADL 4Z,452 1605 feet W-40 35 feet 2560 9911 MD; 9085 TVDfeet 16. To be completed for deviated wells 17. Anticipated pressure (see 20 ^^c 2s.o35 (e)(2)) Kickott depth 5000 feet Maximum hole ancjle 35.4 o Maximum surface 3300 pslg At total depth (TVD) 8800 4390 psig ~ i~J~/' Setting Depth 18. Casing program Specifications s~ze'~ Top Bottom Quantity of cement Hole Casing Weight Grade Coupling Length MD TVD MD TVD (include stage data) 20" Cond. ~0! Surface 110 110 8 cu yds concrete 17-1/2" 13-3/8" 68# L-80 Butt 2650 Surface 2680 2680 3700 cu fl Permafrost 12-1/4" 9-5/8" 47# L-80 NCSS 4460 Surface 4500 9500 12-1/4" 9-5/8" 47# L-80 Butt 9168 4500 4500 9198 8504 3644 cu fl Class G 8-1/2" 7" 26# L-80 IJ4S 963 8948 8254 9911 9085 337 cu fl Class G 19. To be completed for Redrill, Re-entry, and Deepen Operations. Present well condition summary Total depth' measured feet Plugs (measured) true vertical feet Effective depth: measured feet Junk (measured) true vertical feet .~ ~/~ ~a.~,d~e Casing Length Size Cemented Measured depth I pth Structural Conductor ,~ ~:_,~ ~ Surface In term ed i ate Production ~-~,-~,S"~t~ 0~'~ & C~s Liner Perforation depth: measured true vertical 20. Attachments Filing fee [] Property plat [] BOPSketch [] Diverter Sketch [] Drilling program [] Drilling fluid pro,qram [] Time vs depth plot [] Refraction analysis [] Seabed report[] 20 AAC 25.050 requirements[] 21.1 hereby certify ~a~t [he foregoing is true and correct to the best of my knowledge / -- Signed ~.c-~..~f~--~ Title PBU Drilling Engineering Supervisor Date;:~ ~ -~/~ /'/ Commission Use Only I ISee cover letter Permit Number IAPI number Approv~ L t 9/88 Ifor other requirements ~ - I ~' 15o- ~-g- ~./7~' Conditions of approval Samples required [] Yes J~No Mud Icg required []Yes I~No Hydrogen sulfide measures [] Yes~..l~ No Direct~)nal survey required I~ Yes [] No Required wor~s~~P'~~~,/,~, ~ ~'~~'~; ]~5M; []l OM; ~15M; by order of Other:Approved by ~ ' , ' Commissioner the commission_ .Da.t. ...... Form 10-401 Re-'~-t2-1-85 , Submit in triplicate PROPOSED DRILLING AND COMPLETION PROGRAM Well W-39 [33-21-11-12] PBU Install and cement 80' of 20" conductor to surface. Install 20" diverter. Drill 17-1/2" hole to 2700' and cement 13-3/8",L-80,S-95 BUTT casing to surface. Install blowout prevention equipment consisting of 5000 psi W.P. pipe rams, blind rams, and annular preventer. Maximum possible bottomhole pressure is 4390 psi at 8800' TVDss based on original reservoir pressure. Maximum possible surface pressure is 3330 psi based on a gas column to surface from 8600' TVDss and an oil column to 8800' TVDss. Directionally drill 12-1/4" hole to the 9-5/8" casing point above the Sadlerochit Sandstone. Run 9-5/8",47#,L-80 BUTT/NSCC casing to within 5' of 12-1/4" TD and cement in two stages: First stage using Class G cement around the 9-5/8" shoe. The second stage to be downsqueezed in the 13-3/8" annuJus followed by nonfreezing fluid. Directionally drill 8-1/2" hole to TD. Run 7" liner from TD to 250' above 9-5/8" casing shoe and cement using Class G cement. Clean out to 7" float equipment. Change over to 9.6" ppg NaCI completion fluid. Test casing and lap to 3000 psi. Run 9-5/8" production packer on tubing with a sliding sleeve. Set packer 50' above top of liner. A subsurface safety valve with dual control lines will be placed 50' below base of permafrost. Install and test Xmas tree. Displace tubing to diesel. Set and test packer. Shut down rig operations for perforating subsequent to rig release. The well will be perforated in accordance with normal practices. Tubing Size: 4-1/2", 12.6#, L-80, A/B Mod BUTT with 7 GLM's 5-1/2", 17#, L-80 A/B Mod BUTT above ball valve Tailpipe Size: 4-1/2",12.6",L-80, BUTT JLW:21 -DEC-88 w~.n W-39 [ 33-21-11-12] 20" Conductor 110 Ball Valve 2091 13 3/8" Casing Shoe 17 1/2" Open Hole 2680 2700 4 1/2" 12.6# L-80, A/B Mod BtrlT, IPC, with 7 GLM's 5 1/2", 17#, L-80 A/B Mod BUTT, IPC, above ball valve 9 5/8" Packer 7" Tieback Assembly 8898 8948 9 5/8" Casing Shoe 12 1/4" Hole 9198 9203 7" PBTD 98'71 7" Liner Shoe 9911 8 1/2" Open l{ole t~q 1 ] JWB: 6-NOV-87 B.O.P. STACK CONFIGURATION 13-5/8 IN~. TRIPLE RAM STACK SO00 PSI WP DRILLING ANNULAR PREVENTER ! PIPE RAMS 1 BLIND RArlS ] ~ IN. KILL LINE GATE GATE DRILLING SPOOL PIPE RArlS ,] ! 4 IN. CHOKE LINE FLOWLINE DRILLING RISER 20" 2000 PSI WP ANNULAR PREVENTOR GROUND LEVEL 10 3/4" Hydrau~ ~c o[:el-ated~ ~" Butterfly valv~ a~tic~l I y~ closes o ( 10" _ _ ~/~ ] , [,, 12" DRILLING SPOOL i i 2.0" CONDUCTOR PIPE DIVERTER SYSTEM DETAIL DRILL. DEPT. April 1982 J NOTE: DIVERTER ~INE HAS TWO DIRECTION DISCHARGE CAPABILITY AFTER LEAVING RIG SUB-BASES. SURFACE HOLE DIVERTER SYSTEM Two lines venting 90° apart in directions that insure safe down wind venting, and extending to a point at least 100' (feet) from any potential source of ignition. 10 3/4" manual k~ot. terfly valves 10 3/4" 55~ Buttress 10. 3/4" Hydraulic operated Butterfly valve s~-. e, ~~o., ~'1.~~'°~ ~'"~ ~.,/~o ~/~" ,.~ ,, C t. NOTES 1. All pipe connections 150# ANSI Flanges or welded connections and secured to prevent movement. 2. Manual 10-3/4" butterfly valves, mechanically connected to insure that one valve is fail- safe open at all times. 3. All turns are 90° (degrees) and targeted. t NORTH WELL · SURFACE LOCATION LAT. · 70e 17' 47. Z94" LONG. · 149° 05' 41.146" Y · 5, 958, 827.02 X · $ II , 789.00 ZONE 4 1426' FROM N. LINE SECT. 1454' FROM E. LINE ~E:CT. CERTIFICATE OF SURVEYOR: I HEREBY CERTIFY THAT I Al/ PROPERLY REGISTERED AND LICENSED TG PRACTICE LAND IURVEYIN6 IN THE STATE OF ALASKA AND THAT THIS Pt. AT REPRE SERT$ A LOC ATION IURVEY MADE BY ME O~ UNDER MY lUll,ERVISION, jl~, THAT ALL DIMENSIONS AND OTHER DETAILS ARE CORRECT. NO~.' I~, 86 SURVEYOR DATE:: 1 tUlLES ! i WELL PAD W i i WELL N° W- 39 AS-BUILT LOCATED I~ PROTRACTED IECT. I~i, T. II g., R. 12 E., U.M. IURVEYED FOR : ALASKA I~©DUCTIOr',, ,'"',C', PREPARED. IY ; DATE KUUKPIK - TECHNICAL SERV. INC. PRUDHOE 1AY OFFICE CHKD. BY-' R.H. I ..... ii ..... i ii i iii i I ,,, W.3,4 · W -.3,6 · W-S? · i-- ,IF40 · NO~TH Lille -- ellL SUMP · w-24 · w-23 · w,z2 · w-gl · w-20 · · If-IS · w-ir · · · W-14 · W-tS · W-I · · W-4 · · · · W-~ · W-lO · W-II · W-12 1454 ' t WELL PAD'W' __ SUMP WELL tl® W-:~9 Al-BUILT LOCATED IN I~IOTI~ACTF...D ~.CT. IPi , T. N t. , II. I~ II. , U.kl lURVTY[D FOR : I[UUKPIK - TECNNICAL IERV. IGC;. BAT[ I,RAW II Seaech Radius= 3000 COURSE LINE Fo~ p~oposed ~ell' W-39 ~33-21-11-1~] Location = W-E S-N TVD(SBS) Top 611789.00 DgD8827.00 -91.00 Bottom 611342.25 5956420.55 ~085.9~ --- Closest,:.~pp.eoachi,'Analusie _~ Date " _~ ?Timel~ 16:34:43 Note: All depths in Feet Belo~ KeI1u Bushing (BKB) Closest Approach WELL IDENT /PROPOSED\ /NEARBY\ CLOSEST TVD DEPART TVD DEPART DISTANCE A029-2000800 KUP ST 1 AO29-20D2400 MPID1 ! A029-2103300 W-T NO COORDINATE POINTS WITHIN SPECIFIED SEARCH WINDOW 6746.8 721.5 ~135:9 6808.0 4196.7 8449.0 1930.7 8378. D 32D8.9 2313.9 Vertical InterseCtion /PROPOSED\ /NEARBY\ TVD DEPART TVD DEPART VERTICAL .... ' DISTANCE VERTICPd_ DISTANCE SUMMARY The mell mhich comes closest to the p~oposed mell is: A029-2103300 W-T Closest approach distance = KICK OFF Fo~ this ~un = ~313.9 Feet 5000.0 Feet .,3 _$1$DUAIO: £DRANO23]W39_CLO~AP_SHORTT. LIS; --- Closest App?.oach Analusts .... Date: 26-JAN-E~ Time' 16: 35:25 Sea,ch Radius= 3000 7 DEGREE LEAD LINE Fo? p~oposed mell: W-39 [33-21-11-12] Location = W-E S-N TVD(SBS) Top &11789.00 5958827. O0 -91.00 Bottom 611638.86 5956384.04 9085. 99 Note: All depths in feet Belom Kellu Bushing (BKB) Closest Appeoach WELL IDENT /PROPOSED\ /NEARBY\ CLOSEST TV1} DEPART TVD DEPART DISTANCE A029-2000800 KUP ST 1 A029-2052400 MP1511 A0~9-:~103300 W-T NO COORDINATE.POINTS WITHIN SPECIFIED SEARCH WXNDOH 6790.2 752.3 913D. 9 6808.0 4180.6 7~3.4 1301. 6 73~0. 3 3131. 5 2504. 6 .. Veetical Inteesection /PROPOSED\ /NEARBY\ TVD DEPART TVD DEPART VERTICAl_ DISTANCE 8UI~IARY The mell Mhich comes closest to the peoposed veil is: 03300 W-T Closest appeoach distance KICK OFF foe this eun 2504.6 feet 7000.0 feet PITs "AS IS" RIG 3 MUD SYSTEM j CUtT HOPPER ALASKA UNITED DRILLING INC. RIG 3 MUD SYSTEM :x~wv N. ay )ATE APPIOV~D October 1987 CH~CKED SCALE FIL~ NO NTS , CHECK LIST FOR NEW WELL PERMITS ITEM APPROVE DATE Company -~m~.~C).. Lease & Well No. YES NO the permit fee attached .......................................... ~F- ..... REMARKS (2) Loc (8).. (3) Admin ~~ Z/M/,o°~ 9. (9 thru 13) 10. (10 and 13) 12. 13. ( 4 ) C a s g ~f. ~ ~-3 -~2~ (14 thru 22) (23 thru 28) 2. Is well to be located in a defined pool ............................. ~_ 3. Is well located proper distance from property line .................. ~ 4. Is well located proper distance from other wells .................... ~ 5. Is sufficient undedicated acreage available in this pool ............ ~ 6. Is well to be deviated and is wellbore plat included ................ ~ 7. Is operator the only affected party ................................. z~ 8. Can permit be approved before fifteen-day wait ...................... ~ 14. 15. 16. 17. 18. 19. 20. 2i. Does operator have a bond in force .................................. ~_ Is a conservation order needed ...................................... Is administrative approval needed ................................... Is the lease number appropriate ..................................... ~ Does the well have a unique name and number ......................... _~ 22. 23. Is a diverter system required ....................................... 24. Is the drilling fluid program schematic and list of equipment adequate ~ 25. Are necessary diagrams and descriptions of diverter and BOPE attached. 26. Does BOPE have sufficient pressure rating - Test to ~CP<~O psig .. 27. Does the choke manifold comply w/API RP-53 (May 84) .................. 28. Is the presence of H2S gas probable ................................. Is conductor string provided ........................................ Will surface casing protect fresh water zones ....................... Is enough cement used to circulate on conductor and surface ......... Will cement tie in surface and intermediate or production strings ... Will cement cover all known productive horizons ..................... Will all casing give adequate safety in collapse, tension and burst.. Is this well to be kicked off from an existing wellbore ............. Is old wellbore abandonment procedure included on 10-403 ............ Is adequate wellbore separation proposed ............................ tqm (6) OTHER (29 th'ru' 3i) For exploratory and Stratigraphic wells: 29. Are-data presented on potential overpressure zones? ................. / ...... 30. Are seismic analysis data presented on shallow gas zones ............ 31. If an offshore loc., are survey results of seabed conditions presentec[ 32. Additional requirements ............................................. Geology7 Engin. ee!ing: WWB ~ LCS '~ '"BEW/~., rev: 01/28/87 6.011 ...... ~"NITIAL GEO. UN I'T ON/OFF POOL CLASS STATUS AREA NO. SHORE ., Additional Remarks: Well History File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history, file. To improve the readability of the Well History file and to simplify finding information, information of this nature is accumulated at the end of the file under APPENDIX. , No special effort has been made to chronologically organiZe this category of information. Copyright 1987,1988,1989,1990,1991 By WESTERN ATLAS INTERNATIONAL, INC. Ail rights reserved. Tape Subfile 1 is type: LIS **** REEL HEADER **** 91/lO/lO 01 **** TAPE HEADER **** 91/lO/lO O1 Tape Subfile: 1 2 records... Minimum record length: 132 bytes Maximum record length: 132 bytes Tape Subfile 2 is type: LIS TAPE HEADER PRUDHOE BAY UNIT CASED HOLE WIRELINE LOGS WELL NAME: API NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: JOB NUMBER: LOGGING ENGINEER: OPERATOR WITNESS: SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL: FSL: FEL: FWL: ELEVATION(FT FROM MSL 0) KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: WELL CASING RECORD 50029-Z178400 BP EXPLORATION (ALASKA) INC ATLAS WIRELINE SERVICES 17-JUL-91 89816 D. BARBA R. CRAWFORD 21 liN 12E 1391 1453 91.00 91.00 53.00 OPEN HOLE CASING DRILLER' S CASING BIT SIZE (IN) SIZE (IN) DEPTH (FT) WEIGHT (LB/FT) 1ST STRING 2ND STRING 3RD STRING 9.625 9247.0 47.00 PRODUCTION STRING 7.000 9893.0 26.00 CURVE SHIFT DATA - ALL PASSES TO STANDARD (MEASURED DEPTH) BASELINE CURVE FOR SHIFTS PBU TOOL CODE: BCS PBU CURVE CODE: GR RUN NUMBER: 1 PASS NUMBER: 1 DATE LOGGED: LOGGING COMPANY: EQUIVALENT UNSHIFTED DEPTH -- - BASELINE DEPTH $ REMARKS: NO DEPTH SHIFTS REQUIRED TO MATCH GR FROM BCS, $ **** FILE HEADER **** FILE HEADER FILE NUMBER: 1 EDITED CURVES Depth shifted and clipped curves for each pass in separate files. PASS NUMBER: 1 DEPTH INCREMENT: 0.5000 FILE SUMMARY PBU TOOL CODE START DEPTH STOP DEPTH 2418 9167.0 9847.0 $ CURVE SHIFT DATA - PASS TO PASS (MEASURED DEPTH) BASELINE CURVE FOR SHIFTS PBU CURVE CODE:, GRCH PASS NUMBER: 1 BASELINE DEPTH EQUIVALENT UNSHIFTED DEPTH $ REMARKS: NO SHIFT INPUT FILE SINCE NO SHIFT WAS REQUIRED. $ ONE DEPTH PER FRAME Tape depth ID: F 6 Curves: Name Code Samples Units Size Length 1 FUCT 68 1 CPS 4 4 2 GRCH 68 1 GAPI 4 4 3 NPHI 68 1 PU-S 4 4 4 NRAT 68 1 4 4 5 NUCT 68 1 CPS 4 4 6 TENS 68 1 LB 4 4 * DATA RECORD (TYPE# 0) 1014 BYTES * 24 Total Data Records: 38 Tape File Start Depth = 9847.000000 Tape File End Depth = 9167.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 9528 datums Tape Subfile: 2 119 records... Minimum record length: 62 bytes Maximum record length: 1014 bytes Tape Subfile 3 is type: LIS FILE HEADER FILE NUMBER: 2 EDITED CURVES Depth shifted and clipped curves for each pass in separate PASS NUMBER: 2 DEPTH INCREMENT: 0.5000 FILE SUMMARY PBU TOOL CODE START DEPTH 2418 9175.0 $ CURVE SHIFT DATA - PASS TO PASS BASELINE CURVE FOR SHIFTS PBU CURVE CODE: GRCH PASS NUMBER: 1 BASELINE DEPTH files. STOP DEPTH 9847.0 (MEASURED DEPTH) CNC0 EQUIVALENT UNSHIFTED DEPTH LSN0 SSN0 CNRA 9166.5 9168.0 9170.0 9179.5 9257.0 9259.5 9260.0 9261.5 9263.5 9264.0 9269.5 9270.0 9271.5 9272.0 9274.5 9275.5 9276.0 9280.0 9281.0 9285.0 9286.0 9299.0 9309.5 9310.0 9312.0 9313.0 9323.0 9323.5 9328.0 9349.5 9379.0 9380.0 9387.0 9387.5 9399.5 9400.0 9402.0 9167.5 9169.0 9169.5 9179.0 9254.5 9257.0 9260.0 9260.5 9263.0 9264.0 9269.5 9270.5 9272.0 9273.0 9275.5 9276.0 9276.5 9281.0 9281.5 9285.5 9286.0 9299.5 9310.0 9311.0 9313.0 9313.5 9323.5 9324.5 9329.0 9350.0 9379.5 9380.0 9387.0 9388.0 9400.0 9401.0 9403.0 9167.5 9167.5 9167.5 9169.0 9169.0 9169.0 9169.5 9169.5 9169.5 9179.0 9179.0 9179.0 9254.5 9254.5 9254.5 9257.0 9257.0 9257.0 9260.0 9260.0 9260.0 9260.5 9260.5 9260.5 9263.0 9263.0 9263.0 9264.0 9264.0 9264.0 9269.5 9269.5 9269.5 9270.5 9270.5 9270.5 9272.0 9272.0 9272.0 9273.0 9273.0 9273.0 9275.5 9275.5 9275.5 9276.0 9276.0 9276.0 9276.5 9276.5 9276.5 9281.0 9281.0 9281.0 9281.5 9281.5 9281.5 9285.5 9285.5 9285.5 9286.0 9286.0 9286.0 9299.5 9299.5 9299.5 9310.0 9310.0 9310.0 9311.0 9311.0 9311.0 9313.0 9313.0 9313.0 9313.5 9313.5 9313.5 9323.5 9323.5 9323.5 9324.5 9324.5 9324.5 9329.0 9329.0 9329.0 9350.0 9350.0 9350.0 9379.5 9379.5 9379.5 9380.0 9380.0 9380.0 9387.0 9387.0 9387.0 9388.0 9388.0 9388.0 9400.0 9400.0 9400.0 9401.0 9401.0 9401.0 9403.0 9403.0 9403.0 9403.0 9403.5 9403.5 9403.5 9404.5 9405.0 9405.0 9405.0 9412.5 9412.5 9412.5 9412.5 9413.5 9413.5 9413.5 9413.5 9414.0 9414.5 9414.5 9414.5 9438.5 9439.0 9439.0 9439.0 9439.5 9439.5 9439.5 9439.5 9464.0 9464.0 9464.0 9464.0 9464.5 9465.0 9465.0 9465.0 9473.0 9473.5 9473.5 9473.5 9474.0 9474.0 9474.0 9474.0 9475.0 9475.0 9475.0 9475.0 9475.5 9476.0 9476.0 9476.0 9481.5 9482.0 9482.0 9482.0 9489.5 9489.5 9489.5 9489.5 9490.0 9490.0 9490.0 9490.0 9493.0 9492.5 9492.5 9492.5 9495.5 9495.5 9495.5 9495.5 9497.0 9497.0 9497.0 9497.0 9497.5 9498.0 9498.0 9498.0 9498.0 9498.5 9498.5 9498.5 9499.5 9499.5 9499.5 9499.5 9507.0 9507.0 9507.0 9507.0 9507.5 9508.0 9508.0 9508.0 9510.5 9511.0 9511.0 9511.0 9511.0 9511.5 9511.5 9511.5 9511.5 9512.0 9512.0 9512.0 9515.0 9515.5 9515.5 9515.5 9516.0 9516.0 9516.0 9516.0 9629.0 9629.0 9629.0 9629.0 9630.0 9629.5 9629.5 9629.5 9630.5 9630.0 9630.0 9630.0 9631.0 9631.0 9631.0 9631.0 9633.0 9633.0 9633.0 9633.0 9633.5 9634.0 9634.0 9634.0 9643.5 9644.5 9644.5 9644.5 9644.0 9645.0 9645.0 9645.0 9694.0 9694.5 9694.5 9694.5 9766.0 9767.0 9767.0 9767.0 9770.0 9771.0 9771.0 9771.0 9770.5 9772.0 9772.0 9772.0 9816.0 9816.0 9816.0 9816.0 9838.0 9838.0 9838.0 9838.0 9838.5 9838.5 9838.5 9838.5 $ REMARK S: * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 6 Curves: Name FUCT Code Samples Units 68 1 CPS 9403.5 9405.0 9412.5 9413.5 9414.5 9439.0 9439.5 9464.0 9465.0 9473.5 9474.0 9475.0 9476.0 9482.0 9489.5 9490.0 9492.5 9495.5 9497.0 9498.0 9498.5 9499.5 9507.0 9508.0 9511.0 9511.5 9512.0 9515.5 9516.0 9629.0 9629.5 9630.0 9631.0 9633.0 9634.0 9644.5 9645.0 9694.5 9767.0 9771.0 9772.0 9816.0 9838.0 9838.5 Size 4 Length 4 2 GRCH 68 1 GAPI 4 3 NPHI 68 1 PU-S 4 4 NRAT 68 1 4 5 NUCT 68 1 CPS 4 6 TENS 68 1 LB 4 DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: 38 24 Tape File Start Depth = 9847.000000 Tape File End Depth = 9175.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: R~p Code: 68 9416 datums Tape Subfile: 3 149 records... Minimum record length: Maximum record length: 62 bytes 1014 bytes Tape Subfile 4 is type: LIS FILE HEADER FILE NUMBER: 3 EDITED CURVES Depth shifted and clipped curves for each pass PASS NUMBER: 3 DEPTH INCREMENT: 0.5000 FILE SUMMARY PBU TOOL CODE START DEPTH STOP DEPTH 2418 9159.0 9847.0 $ CURVE SHIFT DATA - PASS TO PASS (MEASURED DEPTH) BASELINE CURVE FOR SHIFTS PBU CURVE CODE: GRCH PASS NUMBER: 1 BASELINE DEPTH CNC0 EQUIVALENT UNSHIFTED DEPTH LSN0 SSN0 CNRA in separate files. 9260.0 9260.0 9260.0 9260.0 9260.0 9262.5 9262.0 9262.0 9262.0 9262.0 9267.5 9267.0 9267.0 9267.0 9267.0 9268.0 9268.0 9268.0 9268.0 9268.0 9272.0 9272.0 9272.0 9272.0 9272.0 9272.5 9273.0 9273.0 9273.0 9273.0 9275.0 9275.5 9275.5 9275.5 9275.5 9276.0 9276.0 9276.0 9276.0 9276.0 9285.0 9285.0 9285.0 9285.0 9285.0 9293.5 9292.0 9292.0 9292.0 9292.0 9294.5 9293.0 9293.0 9293.0 9293.0 9295.0 9294.0 9294.0 9294.0 9294.0 9295.5 9295.0 9295.0 9295.0 9295.0 9304.0 9303.5 9303.5 9303.5 9303.5 9304.5 9304.5 9304.5 9304.5 9304.5 9326.5 9326.5 9326.5 9326.5 9326.5 9327.0 9327.5 9327.5 9327.5 9327.5 9327.5 9328.0 9328.0 9328.0 9328.0 9350.0 9350.0 9350.0 9350.0 9350.0 9356.5 9356.5 9356.5 9356.5 9356.5 9364.5 9364.0 9364.0 9364.0 9364.0 9368.5 9368.0 9368.0 9368.0 9368.0 9369.0 9369.0 9369.0 9369.0 9369.0 9369.5 9369.5 9369.5 9369.5 9369.5 9370.5 9370.0 9370.0 9370.0 9370.0 9401.5 9401.0 9401.0 9401.0 9401.0 9402.0 9402.0 9402.0 9402.0 9402.0 9403.5 9403.5 9403.5 9403.5 9403.5 9404.5 9404.0 9404.0 9404.0 9404.0 9415.0 9414.5 9414.5 9414.5 9414.5 9415.5 9415.5 9415.5 9415.5 9415.5 9423.0 9423.0 9423.0 9423.0 9423.0 9424.0 9423.5 9423.5 9423.5 9423.5 9429.0 9428.5 9428.5 9428.5 9428.5 9432.5 9432.5 9432.5 9432.5 9432.5 9437.5 9437.5 9437.5 9437.5 9437.5 9438.5 9438.0 9438.0 9438.0 9438.0 9464.5 9465.0 9473.5 9474.5 9505.5 9506.0 9506.5 9507.0 9516.5 9536.0 9538.0 9538.5 9610.5 9611.0 9618.0 9622.0 9627.5 9628.5 9629.0 9630.5 9631.0 9631.5 9632.5 9642.5 9647.5 9679.0 9680.5 9685.0 9771.0 9796.5 9798.0 9812.5 9813.5 9836.5 9837.0 9837.5 9838.0 9839.0 9839.5 $ REMARKS: * FORMAT RECORD (TYPE# ONE DEPTH PER FRAME Tape depth ID: F 6 Curves: Name 1 FUCT 2 GRCH 3 NPHI 4 NRAT 5 NUCT 6 TENS 9464.0 9465.0 9473.5 9474.0 9505.0 9506.0 9506.5 9507.5 9517.0 9535.5 9537.0 9537.5 9610.0 9610.5 9617.0 9621.0 9628.0 9629.0 9630.0 9631.5 9632.5 9633.0 9633.5 9642.5 9647.5 9678.5 9680.0 9685.0 9771.0 9796.0 9797.5 9812.5 9813.5 9835.5 9836.0 9836.5 9837.0 9838.0 9838.5 64) Code Samples 9464.0 9465.0 9473.5 9474.0 9505.0 9506.0 9506.5 9507.5 9517.0 95_35.5 9537.0 9537.5 9610.0 9610.5 9617.0 9621.0 9628.0 9629.0 9630.0 9631.5 9632.5 9633.0 9633.5 9642.5 9647.5 9678.5 9680.0 9685.0 9771.0 9796.0 9797.5 9812.5 9813.5 9835.5 9836.0 9836.5 9837.0 9838.0 9838.5 Units 68 1 CPS 68 1 GAPI 68 1 PU-S 68 1 68 1 CPS 68 1 LB 9464.0 9465.0 9473.5 9474.0 9505.0 9506.0 9506.5 9507.5 9517.0 9535.5 9537.0 9537.5 9610.0 9610.5 9617.0 9621.0 9628.0 9629.0 9630.0 9631.5 9632.5 9633.0 9633.5 9642.5 9647.5 9678.5 9680.0 9685.0 9771.0 9796.0 9797.5 9812.5 9813.5 9835.5 9836.0 9836.5 9837.0 9838.0 9838.5 9464.0 9465.0 9473.5 9474.0 9505.0 9506.0 9506.5 9507.5 9517.0 9535.5 9537.0 9537.5 9610.0 9610.5 9617.0 9621.0 9628.0 9629.0 9630.0 9631.5 9632.5 9633.0 9633.5 9642.5 9647.5 9678.5 9680.0 9685.0 9771.0 9796.0 9797.5 9812.5 9813.5 9835.5 9836.0 9836.5 9837.0 9838.0 Size Length * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: 39 24 Tape File Start Depth = 9847.000000 Tape File End Depth = 9159.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 19168 datums Tape Subfile: 4 Minimum record length: Maximum record length: 145 records... 62 bytes 1014 bytes Tape Subfile 5 is type: LIS FILE HEADER FILE NUMBER: 4 EDITED CURVES Depth shifted and clipped curves PASS NUMBER: 4 DEPTH INCREMENT: 0.5000 FILE SUMMARY PBU TOOL CODE START DEPTH 2418 9168.0 $ CURVE SHIFT DATA - PASS TO PASS BASELINE CURVE FOR SHIFTS PBU CURVE CODE: GRCH PASS NUMBER: 1 BASELINE DEPTH CNC0 9181.0 9179o5 9183.0 9181.5 9257.5 9258.5 9260.0 9260.0 9261.5 9262.5 9262.0 9263.0 9263.0 9263.5 9264.5 9265.0 9265.5 9265.5 9284.0 9284.0 9285.0 9284.5 9286.0 9285.5 9292.0 9289.0 9294.0 9291.0 9294.5 9292.0 9295.0 9293.5 9298.5 9298.5 9306.5 9306.5 9307.0 9307°5 9308.0 9308.5 9309.0 9309.0 9322.5 9322.5 9323.0 9323.5 9327.5 9328.0 9356.5 9356.5 9369.5 9369.5 9370.5 9370.0 9374.0 9373.5 9374.5 9374.5 9378.0 9378.0 9379.0 9378.5 9387.5 9387.0 9388.0 9388.0 9389.0 9389.0 9390.0 9389.5 9390.5 9390.0 9391.0 9391.0 for each pass in separate files. STOP DEPTH 9848.0 (MEASURED DEPTH) EQUIVALENT UNSHIFTED DEPTH LSN0 SSN0 CNRA 9179.5 9179.5 9179.5 9181.5 9181.5 9181.5 9258.5 9258.5 9258.5 9260.0 9260.0 9260.0 9262.5 9262.5 9262.5 9263.0 9263.0 9263.0 9263.5 9263.5 9263.5 9265.0 9265.0 9265.0 9265.5 9265.5 9265.5 9284.0 9284.0 9284.0 9284.5 9284.5 9284.5 9285.5 9285.5 9285.5 9289.0 9289.0 9289.0 9291.0 9291.0 ~ 9291.0 9292.0 9292.0 9292.0 9293.5 9293.5 9293.5 9298.5 9298.5 9298.5 9306.5 9306.5 9306.5 9307.5 9307.5 9307.5 9308.5 9308.5 9308.5 9309.0 9309.0 9309.0 9322.5 9322.5 9322.5 9323.5 9323.5 9323.5 9328.0 9328.0 9328.0 9356.5 9356.5 9356.5 9369.5 9369.5 9369.5 9370.0 9370.0 9370.0 9373.5 9373.5 9373.5 9374.5 9374.5 9374.5 9378.0 9378.0 9378.0 9378.5 9378.5 9378.5 9387.0 9387.0 9387.0 9388.0 9388.0 9388.0 9389.0 9389.0 9389.0 9389.5 9389.5 9389.5 9390.0 9390.0 9390.0 9391.0 9391.0 9391.0 9392.0 9397.5 9398.0 9400.0 9400.5 9403.0 9412.5 9415.5 9416.0 9422.5 9423.5 9428.5 9431.5 9441.0 9442.0 9454.5 9455.5 9459.5 9460.0 9475.5 9480.0 9480.5 9490.0 9493.0 9501.0 9501.5 9502.5 9504.0 9511.0 9512.0 9512.5 9523.0 9535.0 9535.5 9538.0 9571.0 9609.5 9610.0 9629.5 9630.0 9631.5 9692.5 9699.5 9702.0 9702.5 9703.0 9704.0 9765.5 9766.0 9766.5 9769.5 9774.0 9774.5 9779.0 9779.5 9780.0 $ REMARKS: 9391.5 9397.0 9398.0 9400.0 9401.0 9403.5 9412.0 9415.0 9416.0 9422.5 9423.0 9428.0 9431.5 9441.0 9441.5 9454.0 9454.5 9458.5 9459.5 9475.0 9480.5 9481.0 9489.5 9492.5 9501.0 9502.0 9503.0 9504.0 9511.0 9511.5 9512.0 9523.5 9535.0 9535.5 9537.5 9570.5 9609.5 9610.0 9630.5 9631.0 9631.5 9692.0 9699.5 9702.0 9702.5 9703.0 9704.0 9763.0 9763.5 9764.5 9767.5 9773.5 9774.5 9781.5 9782.5 9783.0 9391.5 9397.0 9398.0 9400.0 9401.0 9403.5 9412.0 9415.0 9416.0 9422.5 9423.0 9428.0 9431.5 9441.0 9441.5 9454.0 9454.5 9458.5 9459.5 9475.0 9480.5 9481.0 9489.5 9492.5 9501.0 9502.0 9503.0 9504.0 9511.0 9511.5 9512.0 9523.5 9535.0 9535.5 9537.5 9570.5 9609.5 9610.0 9630.5 9631.0 9631.5 9692.0 9699.5 9702.0 9702.5 9703.0 9704.0 9763.0 9763.5 9764.5 9767.5 9773.5 9774.5 9781.5 9782.5 9783.0 9391.5 9397.0 9398.0 9400.0 9401.0 9403.5 9412.0 9415.0 9416.0 9422.5 9423.0 9428.0 9431.5 9441.0 9441.5 9454.0 9454.5 9458.5 9459.5 9475.0 9480.5 9481.0 9489.5 9492.5 9501.0 9502.0 9503.0 9504.0 9511.0 9511.5 9512.0 9523.5 9535.0 9535.5 9537.5 9570.5 9609.5 9610.0 9630.5 9631.0 9631.5 9692.0 9699.5 9702.0 9702.5 9703.0 9704.0 9763.0 9763.5 9764.5 9767.5 9773.5 9774.5 9781.5 9782.5 9783.0 9391.5 9397.0 9398.0 9400.0 9401.0 9403.5 9412.0 9415.0 9416.0 9422.5 9423.0 9428.0 9431.5 9441.0 9441.5 9454.0 9454.5 9458.5 9459.5 9475.0 9480.5 9481.0 9489.5 9492.5 9501.0 9502.0 9503.0 9504.0 9511.0 9511.5 9512.0 9523.5 9535.0 9535.5 9537.5 9570.5 9609.5 9610.0 9630.5 9631.0 9631.5 9692.0 9699.5 9702.0 9702.5 9703.0 9704.0 9763.0 9763.5 9764.5 9767.5 9773.5 9774.5 9781.5 9782.5 9783.0 * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 6 Curves: Name Code Samples Units Size Length 1 FUCT 68 1 CPS 4 4 2 GRCH 68 1 GAPI 4 4 3 NPHI 68 1 PU-S 4 4 4 NRAT 68 1 4 4 5 NUCT 68 1 CPS 4 4 6 TENS 68 1 LB 4 4 * DATA RECORD (TYPE# 0) 1014 BYTES * 24 Total Data Records: 38 Tape File Start Depth = 9848.000000 Tape File End Depth = 9168.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code' 68 18944 datums Tape Subfile- 5 161 records... Minimum record length' Maximum record length' 62 bytes 1014 bytes Tape Subfile 6 is type: LIS FILE HEADER FILE NUMBER: 5 AVERAGED CURVES Compensated Neutron: Arithmetic average of edited passes for all curves. Pulsed Neutron: Unaveraged edited Pass 1 gamma ray and background counts; arithmetic average of edited static baseline passes for all other curves. DEPTH INCREMENT: 0.5000 PASSES INCLUDED IN AVERAGE PBU TOOL CODE PASS NUMBERS 2418 $ REMARKS: 1, 2, 3, 4 * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 5 Curves: Name Code Samples Units Size Length 1 FUCT 68 1 CPS 4 4 2 GRCH 68 1 GAPI 4 4 3 NPHI 68 1 PU-S 4 4 4 NRAT 68 1 4 4 5 NUCT 68 1 CPS 4 4 * DATA RECORD (TYPE# 0) 1014 BYTES * 20 Total Data Records: 33 Tape File Start Depth = 9848.000000 Tape File End Depth = 9159.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code- 68 27443 datums Tape Subfile- 6 54 records... Minimum record length: Maximum record length: 62 bytes 1014 bytes Tape Subfile 7 is type: LIS FILE HEADER FILE NUMBER: 6 RAW CURVES Curves and log header data for each pass in separate files; raw background pass in last file. PASS NUMBER: 1 DEPTH INCREMENT: 0.2500 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH 2418 9167.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME LOGGER ON BOTTOM: TD DRILLER (FT): TD LOGGER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT)' LOGGING SPEED (FPHR): DEPTH CONTROL USED (YES/NO): TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE 9847.0 17-JUL-91 FSYS256 REV:G002 VER: 2.0 251 17-JUL-91 9799.0 9833.0 9200.0 9828.0 1680.0 YES TOOL NUMBER CCL PCM GR CN $ CASING COLLAR LOC. PULSE CODE MODULATOR GAMMA RAY COMP. NEUTRON 2323 3506 1310 2418 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE(IN): DRILLER'S CASING DEPTH (FT): LOGGER'S CASING DEPTH (FT): 0.000 9893.0 0.0 BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE TEMPERATURE (DEGF): BOTTOM HOLE TEMPERATURE (DEGF): FLUID SALINITY (PPM): FLUID LEVEL (FT): FLUID RATE AT WELLHEAD (BPM): WATER CUTS (PCT): GAS/OIL RATIO' CHOKE (DEG)' SEAWATER 0.00 0.0 0.0 0 0.0 0.000 0.000 0.000 0.0 NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): THERMAL SANDSTONE 0.00 0.000 NORMALIZATION WINDOW START DEPTH (FT): STOP DEPTH (FT) : AMOUNT: GAS SCALING FACTOR FOR NEAR AND FAR COUNTS: MULTIPLIER: TOOL STANDOFF (IN): REMARKS: LOG TIED INTO BHC DATED 4-5-88. $ 0.0 * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 12 Curves- Name Code Samples Units Size Length 1 CCL 68 1 4 4 2 CLSN 68 1 CPS 4 4 3 CN 68 1 PU-L 4 4 4 CNC 68 1 PU-S 4 4 5 CNRA 68 1 4 4 6 CSSN 68 1 CPS 4 4 7 GR 68 1 GAPI 4 4 8 LSN 68 1 CPS 4 4 9 SPD 68 1 F/MN 4 4 10 SSN 68 1 CPS 4 4 11 TEN 68 1 LB 4 4 12 TTEN 68 1 LB 4 4 * DATA RECORD (TYPE# 0) 994 BYTES * 48 Total Data Records: 142 0.0 0.0 0.0 0.000 0.000 Tape File Start Depth = 9847.000000 Tape File End Depth = 9175.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 53902 datums Tape Subfile: 7 216 records... Minimum record length- Maximum record length' 62 bytes 994 bytes Tape Subfile 8 is type: LIS FILE HEADER FILE NUMBER: 7 RAW CURVES Curves and log header data for each pass in separate files; raw background pass in last file. PASS NUMBER: 2 DEPTH INCREMENT: 0.2500 FILE SUMMARY VENDOR TOOL CODE START DEPTH STOP DEPTH 2418 9175.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME LOGGER ON BOTTOM: TD DRILLER (FT): TD LOGGER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): LOGGING SPEED (FPHR): DEPTH CONTROL USED (YES/NO): TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE 9847.0 CCL PCM GR CN $ CASING COLLAR LOC. PULSE CODE MODULATOR GAMMA RAY COMP. NEUTRON BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE(IN): DRILLER'S CASING DEPTH (FT): LOGGER'S CASING DEPTH (FT): 17-JUL-91 FSYS256 REV:G002 VER: 2.0 34 17-JUL-91 9799.0 9833.0 9200.0 9828.0 1680.0 YES TOOL NUMBER 2323 3506 1310 2418 0.000 9893.0 0.0 BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE TEMPERATURE (DEGF): BOTTOM HOLE TEMPERATURE (DEGF): FLUID SALINITY (PPM): FLUID LEVEL (FT): FLUID RATE AT WELLHEAD (BPM): WATER CUTS (PCT): GAS/OIL RATIO: CHOKE (DEG): SEAWATER 0.00 0.0 0.0 0 0.0 0.000 0.000 0.000 0.0 NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): THERMAL SANDSTONE 0.00 0.000 NORMALIZATION WINDOW START DEPTH (FT): STOP DEPTH (FT): AMOUNT: GAS SCALING FACTOR FOR NEAR AND FAR COUNTS: MULTIPLIER: TOOL STANDOFF (IN): REMARKS: $ 0.0 0.0 0.0 0.0 0.000 0.000 * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 12 Curves: Name Code Samples Units Size Length 1 CCL 68 1 4 4 2 CLSN 68 1 CPS 4 4 3 CN 68 1 PU-L 4 4 4 CNC 68 1 PU-S 4 4 5 CNRA 68 1 4 4 6 CSSN 68 1 CPS 4 4 7 GR 68 1 GAPI 4 4 8 LSN 68 1 CPS 4 4 9 SPD 68 1 F/MN 4 4 10 SSN. 68 1 CPS 4 4 11 TEN 68 1 LB 4 4 12 TTEN 68 1 LB 4 4 * DATA RECORD (TYPE# 0) 994 BYTES * 48 Total Data Records: 145 Tape File Start Depth = 9847.000000 Tape File End Depth = 9159.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code- 68 632J3 datums Tape Subfile: 8 219 records... Minimum record length: Maximum record length: 62 bytes 994 bytes Tape Subfile 9 is type: LIS FILE HEADER FILE NUMBER: 8 RAW CURVES Curves and log header data for each pass in separate files; raw background pass in last file. PASS NUMBER: 3 DEPTH INCREMENT: 0.2500 FILE SUM]VnARY VENDOR TOOL CODE START DEPTH STOP DEPTH 2418 9159.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME LOGGER ON BOTTOM: TD DRILLER (FT) : TD LOGGER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT) : LOGGING SPEED (FPHR) : DEPTH CONTROL USED (YES/NO) : TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE 9847.0 CCL PCM GR CN $ CASING COLLAR LOC. PULSE CODE MODULATOR GAMMA RAY COMP. NEUTRON BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE(IN): DRILLER'S CASING DEPTH (FT): LOGGER'S CASING DEPTH (FT): BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE TEMPERATURE (DEGF): BOTTOM HOLE TEMPERATURE (DEGF): FLUID SALINITY (PPM): FLUID LEVEL (FT): FLUID RATE AT WELLHEAD (BPM): WATER CUTS (PCT): GAS/OIL RATIO: CHOKE (DEG): NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN)': 17-JUL-91 FSYS256 REV:G002 VER: 2.0 104 17-JUL-91 9799.0 9833.0 9200.0 9828.0 1680.0 YES TOOL NUMBER 2323 3506 1310 2418 0.000 9893.0 0.0 SEAWATER 0.00 0.0 0.0 0 0.0 0.000 0.000 0.000 0.0 THERMAL SANDSTONE 0.00 0.000 - NORMALIZATION WINDOW START DEPTH (FT): STOP DEPTH (FT)' AMOUNT: GAS SCALING FACTOR FOR NEAR AND FAR COUNTS: MULTIPLIER: TOOL STANDOFF (IN): REMARKS: 0.0 0.0 0.0 0.0 0.000 0.000 * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 12 Curves: Name Code Samples Units Size Length 1 CCL 68 1 4 4 2 CLSN 68 1 CPS 4 4 3 CN 68 1 PU-L 4 4 4 CNC 68 1 PU-S 4 4 5 CNRA 68 1 4 4 6 CSSN 68 1 CPS 4 4 7 GR 68 1 GAPI 4 4 8 LSN 68 1 CPS 4 4 9 SPD 68 1 F/MN 4 4 10 SSN 68 1 CPS 4 4 11 TEN 68 1 LB 4 4 12 TTEN 68 1 LB 4 4 * DATA RECORD (TYPE# 0) 994 BYTES * 48 Total Data Records' 144 Tape File Start Depth = 9848.000000 Tape File End Depth = 9168.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code' 68 89276 datums Tape Subfile: 9 218 records... Minimum record length: 62 bytes Maximum record length: 994 bytes Tape Subfile 10 is type: LIS FILE HEADER FILE NUMBER: 9 RAW CURVES Curves and log header data for each pass in separate files; raw background pass in last file. PASS NUMBER: 4 DEPTH INCREMENT: 0.2500 FILE S~RY VENDOR TOOL CODE START DEPTH STOP DEPTH 2418 9168.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME LOGGER ON BOTTOM: TD DRILLER (FT) : TD LOGGER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): LOGGING SPEED (FPHR): DEPTH CONTROL USED (YES/NO): TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE 9848.0 17-JUL-91 FSYS256 REV:G002 VER: 2.0 134 17-JUL-91 9799.0 9833.0 9200.0 9828.0 1680.0 YES TOOL NUMBER CCL PCM GR CN $ CASING COLLAR LOC. PULSE CODE MODULATOR GAMMA RAY COMP. NEUTRON 2323 3506 1310 2418 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE(IN): DRILLER'S CASING DEPTH (FT): LOGGER'S CASING DEPTH (FT): 0.000 9893.0 0.0 BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE TEMPERATURE (DEGF): BOTTOM HOLE TEMPERATURE (DEGF): FLUID SALINITY (PPM): FLUID LEVEL (FT): FLUID RATE AT WELLHEAD (BPM): WATER CUTS (PCT) : GAS/OIL RATIO: CHOKE (DEG): NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): SEAWATER 0.00 0.0 0.0 0 0.0 0.000 0.000 0.000 0.0 THERMAL SANDSTONE 0.00 0.000 NORMALIZATION WINDOW START DEPTH (FT): STOP DEPTH (FT): AMOUNT: GAS SCALING FACTOR FOR NEAR AND FAR COUNTS: MULTIPLI ER: TOOL STANDOFF (IN) : REMARKS: $ 0.0 0.0 0.0 0.0 0.000 0.000 * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME Tape depth ID: F 12 Curves: Name Code Samples Units Size Length 1 CCL 68 1 4 4 2 CLSN 68 1 CPS 4 4 3 CN 68 1 PU-L 4 4 4 CNC 68 1 PU-S 4 4 5 CNRA 68 1 4 4 6 CSSN 68 1 CPS 4 4 7 GR 68 1 GAPI 4 4 8 LSN 68 1 CPS 4 4 9 SPD 68 1 F/MN 4 4 10 SSN 68 1 CPS 4 4 11 TEN 68 1 LB 4 4 12 TTEN 68 1 LB 4 4 * DATA RECORD (TYPE# 0) Total Data ReCords: 144 994 BYTES * 48 Tape File Start Depth = 9848.000000 Tape File End Depth = 9168.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code- 68 98607 datums Tape Subfile: 10 218 records... Minimum record length- Maximum record length- 62 bytes 994 bytes Tape Subfile 11 is type: LIS **** TAPE TRAILER **** 91/10/10 O1 **** REEL TRAILER **** 91/10/10 O1 Tape Subfile: 11 2 records... Minimum record length: 132 bytes Maximum record length: 132 bytes End of execution: Mon 14 OCT 91 1:57p Elapsed execution time = 1 minute , 6.9 seconds. SYSTEM RETURN CODE = 0 Schlumberger ' U &CHL.MBERGER OFFSHORE SERVICES ALASKA DIVISION COMPUTER CENTER 500 ~EST INTERNATIONAL AIRPORT ROAD 9951 ANCHORAGE' ALASKA 8 905/562 2654 OPEN HOLE bOG DATA TAPE VERIFICATION LISTING bls TAPE VERiFICAtiON FOR OPEN HOLE EDiT LIS/U physical record map ot ~TAO=[72677]blSA.DAT Using command LIST/DYNAMIC/OUTPUT=(BISU,bST)/STAT{C/SU~AR¥ ,, Job Number 72677 Company Name STANDARD ALASKA PRODUCTION cO. .eZ~ Name ~-~ Fle~d Name PR.U H E BAY County NORTH &LOPE State ALASKA AP! NumDer 50-029~2~784 Date Acquired 0S-APR-88 Run Number Date Processed 18-APR-S8 page , Schlumberger t ! t t t t t t t t I I t I 1 1' I ! I I hiST Command bisting KEY ! Summary ~utput is created by hIST/SUMMARY summaries written for Logical bls struCturest rlbE (Rbbrev= r) bls logical tile into TAPE (Abbrev= T) LIS log#ca! tape tnto REE~ (Abbrev= R) bis logical reel into and ~.or the. entire bI$/A input logical unit'= bU (Abbrev= L) b.lS/A log .leal unit The ~ield"labels appear on some or:all ot these summaries, as indicated by the abbrev., on right, Summ~ryFte~d babels= REEbS aumber ot logical reels on TAPES Number ol logical ta~es on rILES aumber ot logical tl~es on LET #PR Number o.t physical records bRTr) · #LR Number ot logica~ records #DR Number ot data records #ENC ~umber oi encrypted records F) #FM Number ot data ~rames PI Primary index c~annel name F) PI~UNIT$ Primary index units mnemonic F) MAXPi M x va F) M'INPI ~n#mUm Pr#marY index v,a~ue imum primary index ue Page Schlumberger fiST MTA0:[72677]LISA,DAT; Reel header 72677 ** REEL HEADER SERVICE NANE : EDIT DATE : 88/04/18 O~IGIN : F~I REEb'NA~E : 726~7 CONTIHUATION #: PREVIOUS REEL ~ CON~ENT : EDIT biS,STANDARD PRUDHOE BAY ~-39 (33-21-11-12)~API 50-029-21784 Tape headeT 72677 ** TAPE HEADE~ SERVICE NAHE ~. EDIT DATE : 88t04/1B ORIGI~ : FL!C TAPE NA~E 7267? CONTINUATION ~ PREVIOUS TAPE (~oF) File header EDIT ,001 ** FILE HEADER ** FILE NA~E : EDIT; ,001 SERVICE NA~E : FLIC VERSION # : O01A02 DATE : 88/04/18 ~AX, REC. bEN,: 1024 FILE TYPE : bO PREVIOUS,FILE : FLIC comment FLI¢ comment FLIC comment FLIC comment FLIC comment FblC comment FLIC comment FLIC comment FblC comment FblC comment FLIC comment FLIC comment FLIC comment 18-APR-88 20137:27 Page 3 FLIC comment SCHLUMBERGER ALASKA COMPUTING CENTE~ ********************************************************************** dOB NUMBER AT AKDCCI 72677 RUN #i DATE bOGGED: OS-APR-88 LDP: RICK KRUWELL DRILLER)_ TYPE FLUID m LIGNITE DENSITY m 9,8 LB/G DF VISCOSITY · 39 $ DF PH = 9,5 DF FLUID LOSS m 6,6 C] ! DF 9,625" ~ 9247' ' BIT SIZE = 8,5" TO 9893'(DEPTH RN m 2,80 ~ 69 RMF J 3,26 $ 69 R~C ; 2,17 ~ 69 RM AT BHT = 1,075 ~ 19 $ch~.umberqer LIST ~TA0:[72677]Li~A,DATI FLIC comment F~IC comment FLIC comment comment rbZC comment FLI¢ comment rb[C comment FLit:comment rbIc comment FblC comment FLIC comment rblC comment Fb[C comment FLIC comment FLI~ comment comment FLIC comment FLOC comment FLIC comment FLIC comment FLIC comment FLIC comment FLIC comment FLIC comment FLZC comment FL[C comment FLit'comment FL[C comment FLOC comment 20137;27 Page 4 NOTE:: I.)F!bE ED[T.O01 CONTAIN8 DATA OF DUAb INDUCTION (DiL). BORE,HObE COMPENSATED SONIC bOG'(BHC)~ bITHO-DEN~IT¥ bOG (bDT) COMPENSATED NEUTRON LOG (CNB). AND;'GAMMA RAY THRU CASING (CSG) ~bb SAMPLED 2 )FILE gDIT.O02 CONTAINS DATA OF ~fCRO SPHERICAbb~ FOCUSED bOG $'1'1 THIS DA~A HAS NOT BEEN DEPTH SHIFTED -OVERbAYS FIELD SCHLUMBERGER bOG& INCLUDED Wf?H THIS AAGNET!C DUAL ~NDUCTION SPHERICALLY FOCUSED LOG (OIL) DA~A AVAILABLE 9890~ ' TO 925~ BOREHOLE COMPENSATE~ SONIC LOG ~.'~ ' DA~A AVA~bABLEi 9858~ ' a3' biTHO-DEN$ITY'bOG (bDT) D~TA AVA~LABbEI 9899' ~0 ~253~ COMPENSATED NEUTRON'bOG (CNL) DATA AVA~bABLEI 'gee4° TU 9253' GAMMA RAY THRU CASING (C~G) DATA AVAILABLE= :92 53' TO 6880' FLIC comment Data format specification record LiSt!hq of set 1 type b4EB ob~]ect 0 ENTRY VALUE REPCODE SIZE I 0 66 2 0 66 3 184 73 4 1 66 g F~ 65 2 3~ 5 66 13 0 66 14 FT 65 2 15 68 66 16 I 66 1 0 0 66 I End Of set SchLumbe~geT 5/ST MTA0{[72677]bISA.DAT~ 18-APR-8~ 20{]7:27 Page 5 b&stlng ot set 0 type CHAN NANE SERV UNI~ ~ERVICE API API APl AP! F~LE NUmB ~UHB S~ZE REPR PROCE~ ID ORDER ~ LOG TYPE CbA~ MOD NUM~ E~EM ~AMP CODE (HEX) DEPT F~ IbD DIL OHMM CAL$ D[~ IN GR D~L GAPI ?~NS DIL DT 8HC U$/F SP BHC NV BH¢ GAPi TENS BHC DRHO bDT G/C3 RHOB LD~ G/C3 DPH! bDT PU PEF bDT bDT 6U LD~ CPS bDT LI?H LDT CPS $$1 LOT CPS 5$2_ bDT CPS CAb! bDT IN 6$HV bDT V $SHV bDT V GR bDT GAPI TENS bDT bB ~RE$ bDT OHMM MTEM bDT DEGF TNRA CN6 RTNR CNb NPH! CNb PU RCFT CNL CPS RCNT tnb CPS CNTC CNb CPS CFTC CNL CPS GR CNb GAPI TENS CNb bB ~RE$ Nb OH~M MTEM ~Nb DEGF HTEN CN~ GR CSG GAPI ?~N$ CSG bB 0 { I I 4 68 0000000000 0 I I ! 4 ~B OOO0000000 0 I t 1 4 68 O00OO00000 0 I , 1l 4 ~B O00OO00000 0 I 1 4 68 000.0000000 0 1 I I 4 68 0000000000 0 I 1 I 4 68 0000000000 0 I I I 4 68 0000000000 0 ! 1 i 4 68 0000000000 0 I 1 1 4 68 0000000000 0 i I 1 4 ,B 0000000000 0 I 1 I 4 68 0000000000 0 I 1 I 4 68 0000000000 0 1 1 I 4 68 O00000000O 0 1 1 I 4 68 0000000000 0 1 I I 4 68 0000000000 0 I I I 4 ,B 0000000000 0 I I i 4 68 0000000000 0 I 1 I 4 68 0000000000 0 i I 1 ~ 68 0000000000 0 I ! I ~ 6B O0000OO000 0 1 1 I 4 68 0000000000 01 1 I 4 6B 0000000000 4' 6~ 0000000000 0 I I I 6 0000000000 0 1 4 0 1 I 1 4 68 0000000000 0 I I I 4 68 0000000000 0 I 1 I 4 bB 0000000000 0 I I I t 68 0000000000 0 1 I 1 4 68 0000000000 0 1 I ! 4 68 0000000000 0 t ! 1 4 68 0000000000 0 I 1 t 4 68 0000000000 0 I i I 4 68 0000000000 0 I ! I 4 68 0000000000 0 I I I 4 68 0000000000 0 I 1 I 4 68 0000000000 0 I 1 i 4 68 0000000000 0 I I I 4 68 0000000000 0 t I I 4 68 0000000000 0 1 1 I ~ 68 0000000000 0 1 I 1 4 68 0000000000 0 I I I 4 68 0000000000 0 I I · I 4 6B 0000000000 0 I I I 4 68 0000000000 0 I 1 I 4 6B 0000000000 End of set Schlumberger hiST MTAO:[72677]bISA,DAT; 18-APR-88 2013.7:27 Page Data.record type 0 DEPT 9905,. FT 301g.044 M DEPT 990~ GR ~999,2~ PEF '999,25 ~$1 '999,25 bSH¥ '999,25 MTEM '999,25 RCFT '999,25 ?~N$ '999,25 8FhU ~0.38647 OR ~3-9375 TENS 999,25 bL '999,25 $$2 '999.25 SSHV '999 25 HTEN '999 25 RCNT '999 25 MRg$ '999 25 IbD 2 346455 TENs 4{52, DRHO -999,25 bO -999,2'5 CAbI -999 25 GR -999 25 TNRA '999 ~:5 CNTC '999 5 MTEM -999 25 RHO~ -999 bS -999 OSS -999 TENS -999 RTNR -999 CFTC -99 t252 ,25 25 25 25 25 25 25 25 SP -74.5 BP -999 25 DPHZ -999 25 hlTH -999 25 OhS -999 25 ~R~$ '999 25 NPHI -999 25 GR -999 25 GR -999 25 Data record type, 0 DEPT 9805, FT 2988,564 M DEPT 9805. SFLU 5.156569 ~D 2.196202 IbM 2.41.9735 SP -93 875 2.953~25 $$1 227,25 S$2 33 .75 CAbI 8,09375 OSS 0,01220703 OhS -0, 441406 bSHV 1737, SSHV 1704, OR 30.40625 TENS 617~& MRES 0 6899414 TENS 6172, ~RES 0 ~ §9414 MTEM 204,i25 HTEN 1101, GR 9,25 TENS '999,25 Datarecord type 0 DEPT 9705, FT 2958,084 M CAbS 8.421875 GE 4! TENS~5~ DT 79-0625 SP -74t4254~5 GR ~9.21875 TENS 64~2 DRHO ~23007 RHOB 2,413348 DPHI 14, SSi 229.5 SS2 330:5 CALX ~_~375 ass 0.02587891 ~$ -0,006347656 MTEH 204 ~75 HTEN 1402, TNRA ~~759 RTNR 2 2~65 NPH! 2~.62693 RCFT 163{.295 RCNT $903.5i2 CNTC.{ 0.978 Cr?C 1{09-, 09 OR 39.21875 TENS 6412, ~RgS 0.69287il MTE~ 204,375 HTEN 1402, OR"999,25 TENS -999,25 Data record type 0 DEPT 9605, FT 2927,604 M DEPT 9605 SFbU I 3 IbD 12.03364 IbM 10,559 BP CA~$ 8 501813 OR 3~''3747 . .675 TENS 5464. DT 92.375 SP -94.5 GR 3~o625 TENS 6132 DRHO 0.007010043 RHOB 2.286983 DPH! 22.00099 PEt 2345703 ~h ~94.~7533 bO 336.5 ~ 363. ~{TH lie. SS1 2~9,125 SS2 7,25 CAbI 8,390625 QSS 0,02685547 O~S 0,003417969 ,SchLumberger LIST ~TA0:[72677]blSA.DATI 18-APR-88 201,37:27 Page bSHV 1747 SSHV 1714. GR 3a,.625 TENS 6132 IqRE$ 0.6987305 RCF~ ~55~,95~ ~C~T 3698.945 CNTC 3560.065 CFtC 1~05.~04 GR 34.625 ~EN~g~S -9996t32'25, ~R.g~ 0.6987305 ~TE~ 203.375 H~C~ 1162. GR'999.25 Data record type 0 DEPT 9505, FT 2897.t24 ~TEM 20~ HTEN 11 , ZNRA 2.087355 RTNR 2.339622 NPH! ~ 2 RCr~ 18 ~,045 RC~T 4061 eh5 C~IC 3887,877 CfTC 1852i866 G~ ~ 5 TENS ,25 Data record type 0 DEPT 9405, FT 2866,644 ~ DEPT 9405. ~Ab$ 8'9375 R 98,1875 PEF 4.792969 bSHV 1757. ~TE~ 197,625 RCrT 182~,631 TENS ~472, TENS 999,25 TB~S 64~2 DR,O 0.02524678 RHOB 2.625701 DPHI 1 4 2675 MREsRCNT 0.37 ~ 3 ~TEM 197,625 HTEN 1391. GR -9~ 25 Data record type 0 DEPT 9305, FT 2816.164 ~ DEPT 9305. CAbS 9-125 GR 46 PEF 4.§71094 681 20t-125 ~SHV 1759. MTEM 192.375 RCF? 435~,559 TENS 6268, TENS 6108, SFbU 101.0308 GR 43.8t25 TENS b268. bb 93.6875 S$2 280.5 6SHV 1724, H~E~ 1362, RCNT 5972.85 ~RE$ 0.7563477 XbD 40.50121 IbM 48,42297 TENS 5384 DT 57,3125 DRHO 0,00~244328 RHOB 2 086~97 CAbI 8.eS75 055 0.0~7~8125 TNRA 1.~28629 RTNR~ 45,799 SP '61,5 SP '28.9375 DPH! '2,224098 LITH 37.96875 GUS 0,01904297 ~RgS 0,7563477 NPHX 8.604198 GR 460 GR 61.78125 ~chlumbe~ger ~$T ATAO~[?26??]~A,DA~I 18-APR-SB 20~37~27 Page 8 Data. record type 00EPT 9205, FT 2805.684 ~ DEPT 9205 SFLU -999,25 ILO -999,25 Ib~ -999 ~5 SP -999 25 CAbS -999~25 GE -999.25 TENS -999.25 DT -999.5 SP -999 25 GR -999,25 tENS -999;25 DRHO -999,25 RHOB -999 25 DPHI -999~5 PEF -999,25 bh -999,25 hO -999*25 bS -999 25 bltH -999 25 $Sl -999,25 562 -999,25 CAb! -99925 G$S -999 ~5 OhS -999 25 LSHV -999.25 $S,.V -999,25 GR -999:~5 ,E,S -999.5 ,RES -999 25 ~ - ~5 ,PHI -999 25 NTEN -999,~5 H. TEN -999'25 TNRA -999. 5 RTNR 99:9 5 GE -999 25 REPT -999,!5 ReNT -999,25 CNTC -999~ 5 CPTC -999 TEN5TENS ~944,999'25 HRE$ -999,25 NTEM -999.25 HTEN -999 25 GE 79.2 , Data record type 0 DEPT 9105, FT 2775.204 ~ DEPT 9105 SPGU -999 25 IbD -999 25 !bH -99'9 25 SP -999 25 CAb~ '9999 25 GR -999 ~ TE,S -999 ~5 DT -999 i5 &P -9~ ~ GE ~999 25 tE~S -999 ~RHO -999 5 EH08 -999 5 DPH! -9 PEF -99 25 ~h -999 25 bU -999 25 bS -999 5 bITH -999 25 SSI -999 25 ~$2 -999 25 CA~I -999 25 055 -999 5 OhS -999 25 hSHV -999 25 SSHV -9.99 25 GR -999 25 TENS -999 25 NRE$ -999 25 TEN~ -999 25 HRE$ m999 ~5 ~TEN ..' 25 HTEN -999 25 GR 7 , 75 TENS 5.832. Data recor~ type 0 DEPT 9005. F? 2744.724 ~ DEPT 9005 ~PbU -999 25 I~D -999,25 IbM -999 25 SP -999 ~5 CAbS -999:25 GR -999 25 T~N$ -999,25 DT -999 25 SP -999~5 GR -999,25 ~ENS -999 .~ DRHO -999,25 RHOB -999 25 DPS! -999 ~5 PEP -999,25 Lb -999 hU -999.25 b~ -999 25 ~ITH -999 25 SSI -999.25 SS2 -999 25 CAb! -999.25 0~5 -999 25 Ob8 -999 25 bSHV'-999,25 $$HV -999 25 GR -999.25 TENS -999 25 NRE~ -999 25 M~EM -~99.25 HY£N -999 25 TNRA -999,25 R~NR -999 25 NPH! -999=25 RCFT'9 99,25 RCNT -999 25 ¢N?¢ -999;25 CP~C -999 25 GR -999~25 TENS -999,25 MRES -999 25 MTEM -999,25 HTEN -999 25 GE 79,1 75 TENS 5772, Data record type 0 DEPT 8905, FT 2714,244 ~ ....-................................................................................... DEPT 8905, SFbU '999,25 lbD '999,2b IbM '999 25 SP "999,25 ~h$ '999.25 GR '999.~5 TENS '999.25 O' '999 25 SP '999.25 -~25 DRHO -999.25 RHOB -999 25 DPH! -999,25 PEP'999,25 GL '999 ~5 bU '999,25 b$ '999 25 blTH '999,25 SSi '999,25 552 '999,~5 CibI '999,25 055 '999 25 OhS '999,25 SchLumberger LIST MTAO:[72677]blSA,DAT; bSHV -999,25 MTEM -999,25 REFT -999,25 ~SH¥ -999 25 HTEN -999 25 RENT -999 25 MRES -999 25 20=37:27 Page GR -999.25 TENS -999.25 ~RES -999.~5 TNRA -999.25 RTNR -999,25 NPHI -999,Z5 CNTC '999.25 CF?C -999,25 GR -999 ,TE~ -999.Z5 ,~N -999.25 G~ 63.0 Data record type 0 D£PT 8805. FT 2683.764 ~ DEP? 8805 SFhU -999 25 IbD -999 25 ILM -999.25 BP -999 25 CALS '999 25 GR -999 25 TENS -999 25 DT -999~25 SP -999 25 SSl -999 25 CAb! -999 Q&S 25 QbS -999 25 z5 ss2 .999 .25 .999 bSHV -999 2.5 SS~v -999 2S ~ -999 25 T~S -999 2~ ~S -999 25 MTE~ -999 25 HTEN -99925 TNRA -99915 RTNR -999 25 NPHI -999 25 REFT-999 25 RENT -999 25 CNI'C -999 5 CFTC -999 ~25 GR -999 25 TENS -99925 HRES m999 25 ~TE~ -999 5 HTEN -9'99 25 GE 62.4 875 TENS 5664. Data record type 0 DEPT 8705, FT 2653,284 ~ CAbS 99.25 GR '999,25 PEF '999.25 SS! '999,25 bSHV "999,25 ~TE~ -999~25 RCFT -999,25 TENS -999~25 TENS 5588, SFbU -999 25 GR -999 25 TENS -999 ~5 bb -999 5 SS2 '999 25 SSHV -999 25 HT~N -999 25 RCNT -999 25 MRES '999~ 25 bD'999,25 ENS '999,25 DRHO '999,25 bU "999,25 ~bl '999.25 =999,25 TNRA '999.25 CNTC "999.25 MTE~ "999,25 Ib~ '999 RHOB m999 QS$ '99g TEN~ RTNR '999 CFTC -999 HTEN -999 25 SP "999 25 SP -999 25 DPHI -999 25 LITH -999 25 o~s :999 25 aR~$ 999 25 NPHI -999 25 GR -999 25 GR 60,8 , 25 25 25 Data record type 0 DEPT 8605, FT 2622,804 M DEPT 8605, SFbU "999,25 lbD '999,25 IbM -999,.25. SP "999,25 CAbS ~999,25 GR '999,25 TENS "999,25 DT '999,25 SP -999,25 GR '999,25 TENS "999,25 DRHO"999,25 RHOB '999,25 DPHI -999,25 PEF '999,25 Lb '999e25 bU"999,25 b6 '999,25 b~TH '999~25 SS1 '999,25 5S2 '999.25 CALl '999,25 QS$ '999,25 OhS '999,25 bSHV '999,25 S~HV '999,25 OR '999,25 TENS '999,25 MR~$ '999,25 MTEH '999,25 HXEN '999,25 TNRA '999.25 RTNR'.999,25 NPH! '999-25i ~ TENS 5512, .....-.................................................................................. TENS ~ch~umbe~ger hIST ~TAO=[72677]blSA.DAT! 18-APR-88 20=37=27 Page 10 Dat:a .record type 0 DgP'I' 8505, F? 2592.324 M DEPT 8505. SIF~U -99925 I~D -999, 25 IbM -999~,:25 ~P 999.25 GR -999.25 TE ~ -99925 DRHO -99925 RHOB-999~ DPHZ -999.:25 PEP ~999~25 ~U '999 ~ -999 25 25 ~6 -999 ~1 "999~25 S~2 "999 25 CA~I '999 25 O~ "999,25 O~6 -999,25 L~HV '999,25 ~V-999 25 GR "999 25 TgN~ "999,25 ~RE5:999'25 ~TE;~ -999.25 HTEN -999 ~ T~RA -99925 RTNR '999.25 NPH1999.:~5 RCFT -999~25 RCNT -999 ~: CNTC-99925 CFTC ~999~2~ GR -999.25 T~S -999~25 ~R~ -99925 HTBM -99925 HTgN -999,25 GR 63~43~5 ~BNS 5492 ~ Oa:a record type 0 DEPT 8405. FT 2561,844 ~ . DEPT 8405 SFbU-99925 lbo -999.25 Zb~ -99925 SP -999:25 CAbS-99925 GR -99925 TENS -999,25 DT -999 ~5 SP -99925 GE -99925 TENS -99925 DRHO -999.25 RHOB-99915~ DPHZ -999:25 PEP -99925 ~ -99925 ~U -999.25 ~$ -99925 ~ITH -99925 $~1 -99925 662 -999,25 CA~! -999.25 05~ -99925 OhS -99925 ~$HV-99925 $$HV -99925 GR -999,25 TENS -99925 NR~S -99925 ~TBi~ -99925 HTgN -99925 TNRA -999.25 RT~ -9992~ NPH! -99925 .crt .999 25 RCN -999,.25 -999.25 cr c -999 25 .999.25 TENS -999 25 NRE$ -999,25 NTEN -999.25 HTEN -999 25 GR 50,.7~ 125 TENS 5392~ Data record type 0 DEPT 8305, FT 2531,364 ~ DgPT 8305 SFbU -999,25 ~bD -999.25 IbH -999,25 aP -99925 CAbS "99925 GR "999.25 TENS '999. 52 DT -999.25 SP -99925 SSI '999.25 $$2 '99925 CAbI -999.25 OS$ -99925 028 '99925 ~$H¥-999 25 $SH¥ -999 25 gR -999,25 T~.$ -999 2~ ~RE$ -999 25 NTEH -99925 HTEN-99925 TNRA -999.25 RTNR -99925 NPH! -99925 RCFT -99925 RCNT -99925 CNTC -999.2'5 CFTC -999, 25 GR -99925 TENS -99925 RRES -99925 HTEM -999.25 HTEN -99925 GR b3.98'75 ~EN$ 5368, Data record type 0 DEPT 8205. FT 2500.884 H DEPT 8205, SFbO -99925 ILD -99925 ~H -999.25 SP -999.25 CABS -999.25 GR -99925 TENS m99925 D~ -999.25 SP -999.25 GR -999.25 TENS -999 25 DRHO m999 25 RHOB '999.25 DPH~ '999.25 PEF -999.25 bb -999 ~ bU -999 25 US -999.~ biT. -999.25 SS1 -999.25 SS2 -999z~ CAb! -99925 QSS -999.2b 025 -999.25 Schlumberger hIST PTA0:[72677]LISA,DAT/ hSHV '999,25 MTEM '999,25 RCFT '999,25 TENS -99~,25 TENS 534 , SSHV '999.25 HT£N '999,25 RCNT -999.25 MRES -999,25 GR -999 25 TNRA -999 ~5 C~TC -999 5 MTEM -999 25 tS-APR-8~ 20:37:27 Page TENS '999,25 RTN~ '999,25 CFTC '999,25 HT.EN -999,25 MR~S -999,25 NPH! -999.25 GR -999.25 G a f:, 3,7 i ~ 7 1¸1 Data record type 0 DEPT $I05, FT 2470,404 M DEPT 8105. C.ASS ~999,25 GR -999.25 PEF -999.25 LSHV '999.25 MTE~ -999.25 RCFT -999,25 TENS -999o25 TENS 5280. SFLU -999 25 GR -999 TENS -999 bb -999 5S2 -999 SSH¥ -999 HTEN -999 RCNT -999 MRE$ -999 25 25 25 25 25 25 25 25 ILD '999 25 TENS -999 25 DRHO -999 25 LU -999,25 CALl -999,25 GR -999,25 TNRA -999.25 CNTC -999,25 ~TEM '999,25 IbM =999 DT -999 RHOB -999 LS =999 TENS -999 RTNR -999 CFTC -999 HTEN -999 25 SP -999 25 SP -999 25 DPH! -999 :'25 blTH -999 25 O~ -999 :25 NP~I -999 25 GR -999 25 GR 56,8 ,¸25 ,25 125 25 25 25 25 25 25 Data record type 0 DEPT 8005. FT 2439.924 DEPT 8005, CAb~ ~999,25 GR ' '999,2b MT~M SFbU "999 25 GR "999 2b '999 '999 .2~ SSHV-999 2~ ~T~N '999,2~ IUD -999,25 TENS '999,25 DRHO -999,~b ~O '999, 5 CAbl '999.2~ GE ...... '999,2~ IbM -999,25 DT RHOU -9~9,2b AR~ ~999 -999 25 25 ~w,m~-~#-m#mmmmmmm~mmmmm~mmmm'mmm#mmmm,mm-mm-mmmmmmmmmmmmmmmmmmmmmmmmmmm-mm"mmm'-mmmm. Data record type 0 DEPT 790b, FT 2409,444 M DEPT 7905, SFGU '999,~5 IGD "999,25 IbM '999,25 SP '999,25 CASS '999,25 GR '999 25 TENS '999,25 DT -999,25 SP '999.25 GR '999.25 TENS -999 25 DRHO '999.25 RHOB -999,25 DPHI '999.25 PEF '999,25 D~ '999 25 LU -999 25 b$ '999 25 LITH -999,25 SSI -999.25 SS2 -999 25 CA~I -999:25 QSS -999 25 Q~S -999,25 ~SHV -999,25 $SHV -999 25 GR -999 25 TENS -999 25 MRES -999.25 MTEM -999,25 HTEN -999 25 TNRA -999:25 RTNR -999 25 NPHI -999.25 RCFT -999.25 RCNT -999,25 CNTC -999,25 CFTC -999 25 GR '999.25 TENS '999,25 MRES -999,25 MTE~ -999.25 HTEN -999,25 GR 64. Schlumberger hIST MTAO:[72677]LISA,DAT; %8-APR-88 20~37:27 Page X2 Data record type 0 DEPT 7805, FT 2378,964 ~ DEPT 780~, CAbS -99 .25 GR -999 25 PEF -999 25 SSX -999 25 LSHV -999 25 MTEM -999 25 RCFT -999 25 TENS -999 25 TENS 5028. SFbU 99 ,,25 TENS m999 25 b5 -999 25 S$2 -999 25 SSHV -999 25 HTEN -999 25 RCNT -999 25 MRES -999 25 EN$ -999. DT -999 DRHO -999.25 RHOB -999 bU -999,25 5S -999 CALI -999.25 QS$ '999 GR '999.25 TENS '999 TNRA '999,25 RTNR '999 CNTC '999,25 CFTC '999 MTEM -999.25 HTEN -999 ! bM - 999 25 SP -999,25 25 SP -999,25 25 DPH! -999'25 25 LITH -999,25 25 QLS -999 25 ,' 25 MRE$ -999'25 25 GR -9991 5 25 GR 55,5 Data record type 0 DEPT 7705. FT 2348,484 ~ · DEPT 7705. SFLU -999 25 IbO -999,25 IbM -999 25 SP -999.25 CAbS -999.25 GR -999 25 TENS -999.25 DT -999 25 SP -999 25 GR -999.25 TENS -999 25 DRHO -999,25 RHOB -999 25 DPHI -999 25 PEF -999 25 Lb -999 25 LU '9 99.25 5S -999 25 LITH -999 25 SSi -999 25 SS2 -999 25 CAb! '999 25 QSS -999 25 QLS -999 25 bSHV -999 25 SSHV -99~~ 25 GR ~ 25 TENS -999 25 'RES -999 25 MTE~ -999 25 HT~N '99 25 TNRA : 25 RTNR '999 25 'PHI '999 25 RCFT "999,25 RCNT '999 25 CNTC "999 25 CFTC '999 25 GR '999 25 TENS '999.25 HRES '999 25 ~TE~ -999 25 HTEN -999 25 GR 58,8' 5 TENS 4972. Data record type 0 DEPT 7605, FT 23%8,004 ~ CAbS '999 .5 GR '999 CNS "999,25 DT -999 SP -999 PEF '999 bL '999 bU' -999 5 LS ~99 5 LITH 999 25 SS% -999 SS2 -999 25 CAb! -999,25 OSS -999 25 QLS -999 25 bSHV -999 25 SSHV -999 25 GR -999,25 TENS -999 25 MRES -999 25 HTEM -999 25 HTEN-999 25 TNRA -999,25 RTNR -999 25 NPHI -999 25 RCFT -999 25 RCNT '999 25 CNTC '999,25 CFTC -999~ 25 GR -999 25 TENS -999 25 HRE$ -999 25 MTEM -999'25 HTEN -999 25 GR 50,6 5 TENS 4944, Data record type 0 DEPT 7505, FT 2287,524 M DEPT 7505, SFbU -999 25 XLD -999 25 %bM -999 25 SP -999,25 CAbS -999,25 GR -999 25 TENS -999 25 DT -999 25 SP -999,25 GR -999,25 TENS -999 25 DRHO -999 25 RHOB -999 25 DPHX -999,25 PEF -999,25 Lb -999 25 LU -999 25 bS -999 25 LXTH -999,25 25 Schlumberger LIST MTAO:[72677]LISA,DAT; LSH¥ -999 25 MTEM -999 25 RCFT -999 25 TENS -999 25 TENS 4.868, SSHV -999 25 HTEN '999 25 RCNT '999 25 MRES '999 25 GR '999,25 TNRA '-999,25 CNTC -999.25 ~TEM -999,25 18-APR-88 20137:27 Page TENS '999,25 'RES '999,25 RTNR '999,25 NPH! :999,2§ CFTC -999'25 GR 999.25 HTEN -999,25 GR 58,9375 13 Data record type 0 DEPT 7405. FT 2257°044 ~ SFLU -999 25 ILD -999,25 IbM -999,.25 SP -99 25 GR -999 25 TENS -999.25 25 25 TENS -999 25 Lb -999 25 852 -999 25 SSHV -999 25 HTEN -999 25 RCNT -999 25 MRES -999 DEPT 7405. CAbS -999. GR '999: PEF -999 $81 -999. LSH¥ -999~ MTEM '999, RCFT -999 TENS -999 TENS 4812, 25 25 25 25 25 25 25 DRHO -999 25 LU -999 25 CALI--999 25 GR -999 25 TNRA -999 25 CNTC -999 25 MTEM '999 25 PT '999 RHOB '999 kS '999 055 '999 TENS '999 RTNR '999 CFTC -999 HTEN -999 25 SP -999 25 DPH! -99~ 25 LITH -99~ 25 OLS -99 25 NRES -99g 25 NPH! -999 25 GR -999 25 GR 59,5 5 25 25 25 25 25 25 CAbS '999,25 GR '999,25 PEF '999,25 SSi -999;,25 bSHV -999,25 MTEM '999,25 RCFT '999,25 TENS '999,25 Data record type 0 DEPT 7305, FT 2226,564 M DEPT 7305, Sf'bU -999 25 ILD -999 25 IbM -999 25 GR -999 25 TENS -999 25 DT -999 25 RHOB -999 TENS 4744, TENS -999 LL -999 SS2 -999 SSHV '999 HTEN -999 RCNT -999 MRE$ -999 25 DRHO '999 LU '999 25 CA~I -999 25 OR -999. 25 TNRA -999 25 CNTC -999. 25 MTEM -999 25 kS -999. TENS '999 CFTC '99 HTEN -99 SP '999,25 SP '999,25 DPHI '999,25 LITH '999;25 OhS '999'25 MRES -999,25 NPH! -999..25 GR -999.'25 GR 66,3i25 5 5 25 Data record type 0 DEPT 7205, FT 2196,084 M DEPT 7205, SFLU -999 25 ILD -999,25 IbM -99~ 25 SP -999 25 CAbS -999,25 GR -999 25 TENS -999,25 DT -99 25 SP -999 25 OR -999,25 TENS -999 25 DRHO -999,25 RHOB -999 25 DPHI -999 25 ~EF -999,25 Lb -999 25 LU -999.15 bS -999 25 LIT. -999 i~ SS! -999,25 $62 -999 25 CA~I -999, 5 QSS -999 25 ObS -999 5$HV -999.25 SSHV -999 25 GR -999,25 TENS -999 )5 ~RES -999 ~5 MTEM -999,25 HTEN -999 25 TNRA -999,25 RTNR -999 5 NPH! -999 5 RCFT -999,25 RCNT -999 25 CNTC -999.25 CFTC -999 25 GR -999 ~5 TENS -999.25 MRES -999 25 ~TE~ -999°25 HTEN -999 25 GR 66,1 5 TENS 4680, $chl~mberqer hiST ~TAOg[72677]blSA.DATI 18-APR-S8 20~37~27 Page 14 Data record type 0 DEPT 7105, FT 2165,604 DEPT ~I0 , GR '999, PEF -999. $51 -99 25 MTEM -999 25 RCFT -999 25 TENS -999 25 TENS 4624, FLU "999. 25 R '999 25 TENS '999 5 5b "999 ~5 5$HV -999 HTEN -999 25 RCNT -999 25 ~RES -999 25 ILD -999.25 TENS '999,25 DRHO '999.25 LU '999.25 CAb! '999 25 GR "999 25 TNRA '999 25 CNTC '999 25 MTEM -99925 IbM -999 25 DT -999 RHOB -999 kS "999 Q85 '999 TENS -999 RTNR -999 CFTC -999 HTEN -999 SP DPH! -999 25 ~ITH -999 ~R£S -999 25 .NPHI -999 25 GR -999 25 G~ ~20, -999 25 25 ,125 Oata'recordtype 0 DEPT 7005, FT 2135,124 ~ DEPT 7005, SFhU -999 25 ILD -999,~5 Ib~ -999 25 SP -999 25 CAbS '999.25 GR "99925 TENS '999,252 DT -99925 SP '9992525 GE "999.25 TENS "999 25 DEHO '999. 5 RHOB -999 25 DPH! '999 PEF '999.25 b5 "999 ~5 LU '999 25 L8 -999 25 51TH "999 25 SS1 -999,25 552 -999 25 CALl -999 25 OS$ -999 25 OhS -999 25 ~TEM -999. flTEN -999 25 TNRA 25 RTNR -999 25 NPH! -999 RCFT '999.=5 RCNT '999 25 O,TC '999,25 CFTC "999 25 GR '999 25 TEN8 -999'25 ~RE8 -99925 MTEH -999,25 HTEN -999 25 GR t36, ~5 TENS 4584, Data.record type 0 DEPT 6905. FT 2104,644 M DEPT 6905, CAbS '999,25 GR '999 GR -999,25 TENS -999 PEF '999,25 bb '999 SS~ -999;25 882 -999 bSHV -999,25 SSHV -999 MT~ -999,25 HTEN -999 R~FT -999,25 RCNT -999 TENS -999.25 MRE8 -999 TENS 4512, SFbU -999 25 IbP '999,25 IbM '999,25 25 TENS'999.25 DT '999.25 25 DRHO "999'25 RHOB '999,25 25 [,U '999,25 b8 "999,25 25 CAb! '999,25 958 '999'25 25 GR '999.25 TENS "999,25 25 TNRA -999,25 RTNR -999.25 25 CNTC -999.25 CFTC -999,25 25 ~TEM -999,25 HTEN -999,25 SP '99g,25 DPH! -999 bITH -999,25 OhS -999,25 MRES -999,25 NPH! -999 5 GR -999~ 5 GR 97.~ 5 File trailer EDIT .001 Schlumberger LiST HTA0:[?26??]LISA,DAT; 18-APR-88 20137:27 Page 15 FILE NA~E I EDIT .,00! SERVICE NAME : FbIC VERSION # : 001A02 DATE I 88/04/18 MAX. REC, LEN,: 1024 FILE TYPE : LO NEXT FILE : FILE SUMMARY #LR #PR #ENC #PR #FM PIPI.UNITS MAXPI MINPI 1262 1267 0 1211 6054 DEPT FT 9905. 6878 5 DEPT M 3019,044 2096 567 DEPT ,I!N 1188&00, 8254 O, (EOF) File header EDIT ,002 ** FILE HEADER FILE NAME :'EDIT ,002 SERVICE NAME I FbIC VERSION # : 001A02 DATE : 88/04/18 MAX, REC'~ bEN.: 1024 FILE TYPE t LO PREVIOUS FILE : Data ~ormat specification record Listing of set 3 type 64EB object 0 ENTRY VALUE REPCODE SIZE 0 66 1 ~ 0 66 3 16 73 4 4 1 66 1 8 0.1666667 68 4 9 FT 65 2 11 64 66 1 13 0 66 1 14 FT 65 2 15 68 66 1 16 I 66 1 0 I 66 1 End of set SchlembeTger HIST ~TA0~[72677]LISA.DATI 18-APR-99 20~37~27 Page 16 bistlng of set o type CHAN ID ORDER # LOG TYPE CHASS .OD NIJ~B E~E~ SA~P CODE (HEX) DgPT FT 0 2 I 1 4 68 RIO DIH ~HO 0 2 ! ! 4 68 0000000000 RI1 DI~ M~HO 0 2 I ! 4 69 0000000000 ~SFL D[~ OH~ 0 2 ! 1 4 68 0000000000 End of set Data: record type' 0 DEP? 9905,332 FT 3019,145 H OEP? 9905,332 RIO 97,5625 RI1 ROI,S ~$Fb I0,125 Data record type: 0 DEPT 9805,332 FT 2988.665 DEPT 9805,332 RIO 95,75 RI1 373,5 Data record type' 0 DEPT 9705,332 FT 2958,~95 ~ DEPT 9705,33~ RIO I04,0625 RI~ 264. ~srb 7,789063 Data record type 0 PEP? 9605,332 FT 2927,?05 N DEPT 9605,332 RIO 59~,75 R!I 204,.875 MSFb !6,.85938 Data record type 0 DEP? 9505,332 FT 2997,225 H DEPT 9505,332 RIO 41,90625 RII 119,3125 MSFb 23,14063 m~mmmmmmmmmmmmmmm~mmmmmm~mmmmMmmmm~mmmmmmmm~mm~mm~m~mmmmmMm~mmmmmmmmm~mMmm~m~m~mm~m~ Data record type o DEPT 9405.332 FT 2966,745 M DEPT 9405,332 RIO 5.511719 RI1 93. MSFb 81,875 Schl.umberger LiST ~TAO:[72677]bISA,DATl 18-APR-88 20137~27 Page Data record type 0 DEPT 9305,332 FT 2836,265 M DEPT 9305,332 RIO 22,1575 AIl 174,125 MSFb 55,34375 File trailer EDIT ,002 FILE NAME ~ EDIT ,002 SERVICE NA~E ~ FblC VERSION # Ir001A02 DATE FILE TYP.~E ~ LO ~EXT FILE #hR )PR #ENC ~DR #FM PI PI.UNITS MAXPI MINPI 71 72 0 65 4068 DEPT FT 9g05,332 9227,5 DEPT M 40, (EOF) Tape trailer 72677 ** TAPE TRAILER ** SERVICE NAME ) EDIT DATE ) 88/04/18 ORIGIN ~ FLIC TAPE NAME I 72677 CONTINUATION #: 1 NEXT TAPE ~ COMMENT ~ EDIT [,IS,STANDARD PRUDHOE BAY W-39 (33-21-11-12),API 50-029-21784 TAPE SUMMARY FILES #hR #PR 2 1335 1341 Reel trailer 72677 $chl=mbe~ger LIST ~TA0:[72677]LISA.DATI 18-APR-SB 20137:27 Page 18 ** REEL TRAILER ** SERVICE NAME I EDIT DATE I 88104118 ORIGIN : FblC REEL ~A~£ : 72677 CONTINUATION #: NEXT R~Eb : COMMENT : EDIT LIS.STANDARD PRUDHOE BAY w-39 (33-21-i1-12),API 50-029-21784 ~EEL SUMMARY FILES TAPES #LR ~PR 2 I 1337 1343 (gor) (gOD) F~LE$ TAPES REEb~ ,#LR #PR 2 I i 1337 1343 ! End Of llstlng MTAO:[72677]bISA,DAT) FIEI~D NA~E STAT~ REFERENCE NO STANDARD A6ASKA,PRODUC?ZON 7303! CO, PAGEr **** REEL ..HEADER **** . C:OM~E~'~ = ~ IS TAPE AP ! It: 50".02 9-::2 ! ?84 C~MiE.NT bls TAPE, ;S, .P.e. W"39, AP1 #50"'0:29"21784 **'** F~LE HEADER **** NAME = ,00! DATE = t2/ 5 L~ TYPE ** SCHLUMBERGER WELL SERVICES COMPANY NAME= W~bb= FIELDI BOROUGH= STATEI AP! NU~ER~ ANDA RD ALASKA ~ODUCTXON CO, 39 (33'.21-11-1 A~SKA 50 LOCATION= 13gl* SNL G 1453' WEL SECTION= 21 TOWNSHIP= lin RANGE= PERMANENT DATUM= MSL ELEVATION= ~ LOG MEASURED FROM KB 91, ABOVE P£RM ~ENT DATUM TYPE F:~UID I'N ~OLE,' CRUDE 8982 T.~ME t~OGGER ON BOTTOP~ 1900 I 46 ATC~-CB,,1485 bOGGING PU PED IN~O WBLLI PRODUCED WATER & .16 BBbS'D:i:ESE:L RAN A 2,5" CNL DN OH 8ANDTONE MATRIX DATE JOB STARTEDI 2-DEC-88 dOB REFERENCE NO 73031 LDP/ANAI R, $IN':E~ THIS DATA HAS NOT BEEN DEPTH SHIFTED - OVERbA¥$ FIELD PRINTS SCHLUMBERGER LOGS INCLUDED WITH COMPENSATED NEUTRON bOG - PASS #2 (.P$2) FIRST TO bAST READINGI 9835' TO 9200' 'A ~ BLE ~YPE ~ TU~ ! VA~ DEF! OPE ,¥ ion TYPE I CURV DEFY NS NPHY RNRA NRA? GR T~NS NPH! RNRA FCNI, NRAT EPTH CHANNEl, NAME enston NEUTRON PORO&IT¥ Raw Neutron Ratio (Near/rat) rat CN,b Detector Counts Near CNL Detector counts Neutron RatLo (ND/rD) CCh Ampi{rude Gamma Ray ?enston NEUTRON POROSITY Raw Neutron Ratio (Near/Far) rat CNb Detector Counts Near CNL DetectorCounts aeut on R tie (ND/rD) CCL [ a mplitude 6,-DEC-!988 08g07 PAGE! 4 D.I~FI :TY SET TYP~ -64~ ** 4 66 1~ 66 8 ! 68 13 66 0 14 65 FT 15 66 68 16 66 0 66 0 N~, P$4 CPS 4 NRAT P$4 C~h P84 O0 000 O0 0 O0 000 O0 0 O0 000 O0 O0 000 O0 ~ ~ 44 O0 000 O0 O0 000 O0 O0 O0 0 660o oo , O0 O0 0 O0 000 O0 0 O0 000 O0 0 O0 000 O0 0 O0 O0 ooo o , ss. oo: o 4 O0 000 O0 0 1 0000000000 0 NPN! HbA PU O0 000 O0 0 1 ~ 3'I. 4 6g 0000000000 DEPT, g870eO00 TEN&.P8 ~gg9 T~NS GR.P82 -999250 TENS,PS3 -999 FCNL.P&3 -999250 NCNb. P83 -999 GR,PS3 -999 250 T~NS~P$¢ ~999 FCNt.,P$4 -999250 NCNb,PS4 -999 GR.P$4 -999 250 ~PHZ.H A~ 0 250 NPHI*P8! -999.250 RNRR,P$1 RNR,D$2 NRAT,P$3 -9' 2 ~00~0 NRAT,P&4 -9'99,250 CCbeP84 -999~ 0 rificatlOn List: be'rqer Ala PS1 18 ! - PS4 GR PS4 FCNL , PS2 ,PS3 FCG~ PS3 ,N~ P54 G~ PS4 DEPT FCNL PS ! FCNL F .iNL PS3 P$4 FCNL,P8! FC~LtPS2 563 500 000 ! 54 000 000 000 2 109 i 485 000 20 594 9400 000 3030 000 40 594 2780 000 30~ ~ 438 000 000 4! 844 9300,000 17!3'000 ,000 Center NPHX~HbA TENS PS4 NCNb NPH l HLA CNL,P81 ENS NCNb,PS3 TENS P84 NCNb PS4 NPHX HLA NCNb PSi TENS PS NCNb P$~ TENS PS3 NCNb PS3 TENS PS4 NCNb P$4 NPH! HLA TENS,PSI NCNb, PS i TENS, PS NCNLepS) 3~ 4 40: I0 4,48.8 10 000 ooo ooo ooo 0 0 000 000 ° °o°O O0 0 0 000 9 96t 10 000 5284 000 10 000 3974 000 NPHI~ '4 NR~T 4 RAT~ NRA? NRA? CCL ,4 )'8X4 RNRA: ,369 CCL PSi NPHI, PS 1 NRAT,P$1 NPHX~PS2 NRAT,PS2 CCL; PSi , CCL'PS~ ,Oil4 ,000 3,541 0,000 DI ape verification bLstlnQ mb er Qer :A! as.K Corn put ! nQ ~e n t e r 6-DEC-19~8 08='07 TENS,PS3 EN$~PS4 000 TENS NCnb TSNS PS4 ~C~b PS4 NPHI HLA 000 21 10 000 NPH! ;3 PH END OF DATA %IWq RNRA,PS3 3 047 ,PSi 6 477 PS4 0 RA ,PSi -9! 2'50 PS4 ~9'99 FILE TRAILER = EDiT ,001 ' ERSiON : 2 DAT~ I 88/ MAX AEC S~ZE I i0962/ 5 FTb~ TYPE I LO LaST FILE **** TAPE TRAILER **** SERVICE NAME : EDIT D~TE , 88/~2/ 5 O_IClN t Fbi TAPE NAME I 7303! C~NTINUATION # P~E~IOUS TAPE COHHENT ~ LIS TAPE, SeR,P.C. W-39, AP! #50-029-~1784 ,cat. PAGE~ 8 TAPE. /~P::! #5.0~"02:9-2:1 ?'84 P R O G R A M: L' I S C A N REVI SION: 5.1 St~r~ of e×e,~cUt:ibn: Th~u 16 NOV 89 2:37p **** REEL HEADER **** L I S 89/!0/11 01 'LIS CusTOMER FORMAT T~PE" **** TAPE HEADER **** L tS - , 89t10/11 ~058 01 PASS CN/:MS, 9850-9180 FT.~' F ILiE ff 1 PASS 1. 001 **** 'FILE HE~DER **** 1024 CN :, .B.P. EXcPLORATION W,N : PRUDHOE BAY FN : W-39 COUN : NORTH SLOPE STAT : ALASKA , FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME TAPE DEPT~ UNIT : FT 12 CURYE S : NAM E GR TTEN TEN SPD CCL CODE SAMPLE# UNIT 68 1 68 I LB 68 I LB 68 I F / 68 1 VOLT BYTES 4 4 4 4 4 · 8 · LSN 9 C L~SN 1:0 CN 1.1 C N C 12 CNRA 68 i CTS 4 68 1 CTS 4 68 I PCT 4 68 I PCT 4 68 I CIC 4 * O~T~ RECORD D EP TH CCL CN 9850.000 '150.0000 0.0000000 8,oo.ooo 0. 0000000 29.05604 9750.000 O. 0000000 22. 166!11 9700.000 0. 0000000 15.72487 9650.000 0.0000000 20.89447 9600.000 0.0000000 1,8. 76846 9550.000 0.0000000 25.48392 9500.000 0.0000000 16.74799 9450.000 0.0000000 20.61176 9400.000 :1.000000 5.704420 9350.000 0.0000000 29.73085 9300.000 0. 0000000 14.3.401 2 9250-000~ CT: Y P E 0.) GR SSN CNC 0.0000000 50.00000 0.0000000 25.57806 193.9187 31.09552 13.63835 218.3344 23.69583 23.07300 250.6312 1,7.68434 39'69954 262.8562 22.50134 40.19299 279.7979 20.51279 15.61910 233.1 463 26.83009 23.96141' 287.4434 18.63272 62. 73018 225.5299 22.23630 40.39565 4:00. 2073 8.525167 62.71 941 207.0518 30.87964 45.48499 309,7454 16.40465 39.54288 994 BYTES * TTEN CSSN CNRA 0.0000000 50.00000 0.0000000 1096.814 193.9187 0. 7382816E-01 1095 .Z76 21 8 · 3344 0. 9020317 E-01 1258.938 250.63t2 0.1113423 1058.999 268. 8562 0.9369630 E-01' 1044.470 279.7979 0.10021!22 1046. 601 233.1463 0.8228213E-01 1041. 809 287.4434 0.1073296 I045.327 225.5299 0.9451187 E-01 104t. 790 400.2073 0.1781769 t019.916 207.051'8 .7420206E-01 1024.839 309.7454 0.11'72886 ~1008.416 TEN LS N -200.0000 0.0000000 139.1736 57.26666 40.59976 78.77779 1~70.1049 111.6233 1.203835 98.51457 -2.270725 112.1566 0.2912748 76.73514 4.939475 123.4047 7.143712 85.26097 7.463963 285.2310 1.160525 61.45470 5.568690 1'45.3183 0.9394002 A -- SPD CLSN 0.0000000 0.0000000 26.34241 14.31666 26.99730 19.69446 26.34241 27.90584 26.99730 24.62865 26.99730 28.03915 26.99730 19.18378 25.99741 30.85118 26.88811 21.31525 26.99730 71.30771 26.99730 15.36367 26.99730 36.32959 26.99730 9200 . 0~0 50.81316 0. 0000000 0 . 0000000 145. 7443 1 45 . 7443 55. 21536 56.06480 0. 5166095E-01 -200.0000 30.11716 0.0000000 7.529290 TOTAL OATA RECORDS : STARTING TAPE oEiPTH = **** FILE~TRAILER **** 71 9B50.00 ENDI~NG T AP E DEPTH = 9180.00 FILE # 2 PASS ~.002 **** FIL?E HEADE'R **** 1024 :.* FORMAT RECORD ONE DEPTH PER FRAME TAPE DEPTH UNIT : FT 12 CURYES : N.A!M E I GR. 2 TTEN 3 TEN 4 S P'D 5 CCL 6 SSN ~ $SN 8 L SN 9 CLSN 1 0 CN . 1t CNC I 2 CNR A OD E 6:8 68 68 6:8 68 68 68 68 68 68 S AMP 1 1 1 1 1 1 1 1 1 1 1 1 L E# UNIT API LB LB F/MM VOLT C TS C T.S CTS CTS PCT PC T C/C 4 4 4 4 4 4 4 4 4 4 TES DATA' RECORD DEPTH CCL CN 9850.000 150.0000 0,0000000 9800.000 0.0000000 27.27921 9750.000 0.0000000 21.41~393 GR SSN CNC 0.0000000 50.00000 0.0000000 24.02393 192.4221 28.53680 1 5. 22338 216.3552 22.98883 994 BYTES * TTEN CSSN CNRA 0-0000000 50'00000 0.0000000 10t5.468 192. 4221 0.7861 471E-01 1004. 722 216.3552 0.9223551E-01 TEN LSN -200.0000 0.0000000 135.8712 60.50887 44.65567 79.82248 SPD CLSN 0.0000000 0.0000000 28.99710 15.12721 28.99710 19.95563 I 5.1 5442 2515. 2465 17.15662 9650.000 46. 53015 O. 0000000 2612. 5479 19.755.60 21. 434'78 9600. 000 39 . 51 01 0 0.0000000 27 4. 5842 18.24365 20.02353 255.2465 0.1137154 989.7056 262.5479 0.9707409 991'0525 274.5,~42 O. 1 01 966? 9550. 000 17. 94032 990. 2009 O. 0000000 235. 1943 235.1'943 27. 21774 28. 47824 O. 787 3392 9500. 000 26.78343 993. 5681 0.0000000 ZSO. 5339 280. 5339 1 5. 55035 17. 52281 O. 11 20574 9450.000 5-5.66925 0.0000000 229.5761~ 20.56905 22.1962~ 9400.000 46.1 5788 0.0000000 402.4236 6.13271 6' 8.91 !852 9350.000 59. 17213 O. 0000000 211. 9032 30. 97658 32. 07545 . 9300.000 53.20135 O. 0000000 312. 7742 I 4.-26071 16. 33139 92 50. 000 38. 98169 O. 0000000 127.6555 90.51057 93.45171 9200. 000 46.91 208 O. 0000000 145. 1791 77.54390 79.37834 E-01 , E-01 992.1245 229.5761 O. 9463632E-01 979.8625 402.4236 0.1 735139 976.1389 211.9032 0.7219529E-01 977.2114 31 2.7'742 O. 1 176494 960.9771 127,6555 0.4256873E-01 · 0,0000000 1.45.1791 O. 4491995E-01 116.1018 -32.23637 101.9464 -9.527592 111.9939 0.9689851 74.07104 I .064146 I 25.7437 1.557025 86.90497 3.106425 279.3044 -0.12047541 61.19366 5.953601 147.1907 3.680130 21.73653 -200.0000 26.08577 29.02545 28.99710 25.48659 28.99710 27.99846 28.99710 18.51778 28.99710 31.43591 28.99710 21.72624 29.00301 69.82611 28.99710 15.29841 28.99710 36.79768 29.590~1 5.434132 0.0000000 6.521441 TOTALi DATA RECORDS : 71 STAR:TING TAPE DEPTH = 9850.00 FILE TRA~ILER **** ENDING TAPE DEPTH = 9180.00 FiILE # 3 **** FILE HEADER **** PASS 3.003 1024 * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME CjR:, ES - ,NAME CODE SAMP I GR 68 1 2 TTEN 68 1 3 TEN 68 1 4 SDD 68 1 5 CCL 68 1 6 SSN 68 1 7 CSSN 68 1 8 LSN 68 1 9 CLS N 68 1 10 CN 68 1 11 CNC 68 1 I 2 C NRA b8 t LE# UNIT A.P I LB LB F/MM ¥0 L T CT$ CT:S CTS CT:~S PCT PCT C/C BYTE S 4 4 4 4 4 4 4 4 4 4 4 · * O,~'TA' RECORD :~TYP E# 994 BYT, ES * D. EP TM G R T TEN CCL SSN C S SN C N 'C NC C NRA 9850.000 ,1~50,0000 0.0000000 9800.000 0.000:0000 26.85774 9750.000 0.,000:0000 23.11646 9700.000 0.0000000 .!5.15285 9650.000 0.0000000 20.68839 9600.000 0. 0000000 18.21622 9550.000 0.0000000 25.72902 9500. 000 0.0000000 16.74100 O. 0000000 50. 00000 0.0000000 27.09261 1 94. 6203 28. 13545 17.65569 214- 9830 24.59097 27. 42995 260. 8682 17.15517 6:0.71770 253.6867 22.30812 37.36525 275.9666 19.99797 16. 04045 231,9482 2 7. 062:65 23.52246 28 2.78:88 18.62624 50.13039 237. 2644 22. 30096 44.87750 400.5410 8. 258097 9450.000 0.0000000 20.68076 9400.000 0,0000000 5.408330 0.0000000 50.00000 0.0000000 1014.811 194.6203 0.79~,4059E-01 1013.283 2t4.9830 0.8776760E-01 1015.526 260. 8682 0.11.:37220 1011 . 083 253.6:867 0.9428942E-01 1015.264 275.9666 0.1020602 1004-639 231-9482 0. 8175754E-01 996.4229 282.7888 0.1073560 1002.757 237. 2644 .9431t:42E-01 998.2698 400.54'10 0.181 5730 TEN LS N -200.0000 0.0000000 132.2523 61.84303 45.72592 75.47423 27.68303 118.6658 5.341466 95.67982 -18.90421 112.6608 0.9964353 75.85437 -0.5215498 I 21.4363 3.817380 89.50699 8.016619 290.9097 SPD CLSN 0.0000000 0.0000000 27.99721 15.46076 27.99721 18.86855 27.99721 29.66646 28.10640 23.91997 27.99721 28.16521 27.99721 18.96359 27.99721 30.35907 27.99721 22.37674 28.99710 72.72742 O~0000000 29.595.64 217.1810 3O .75006 9300.000 41.67845 0.0000000 317.4197 13.65088 15. 76936 217.1810 O. 7442898E-01 968.3350 317.4197 0.1204986 9250.0 0 41.92526985.33 O. 0000000t30. 3450 I 30.34 82'30540 84. 50060 0.439'72 9200. 000 45 · 0901 0 O. 0000000 I 46. 1859 69. 47441 70.81 845 91 5O 84E-01 976. 823 146.1 85 0.468246 5 9 4E-01 64.65826 -0. 7106507E-01 152.9945 5.824283 22.92656 6.343391 27.38040 16.16457 28.99710 38.24863 28.99710 5.731640 28.99710 6.845104 TOTAL OATA RECO~!DS: : 71 STARTING TAPE DEPTH = 9850.00 **** FILE TRAiILE~ **** ENDING TAPE OEPTH = 9180.00 FILE #~ 4 **** FILE ' HEADER **** PASS 4. 004 1024 * FORMAT RECOR~O (TYPE# 64?): ONE DEPTH PER/ FRAME TAPE DEPTH UNIT : FT 12 CUR':YES : ~NAME CODE I G R 68 1 2 TTEN 68 3 TEN 68 1 · 4~ S P O 68 1 5 CCL 68 6 SSN 68 1 7 C S S N 68 1 8 LSN 68 t : 9 C L S N 68 : 1 10 CN 68 1 11 CNC 6 $ 1 12 CNRA 68 SAMPLE-# UNIT BYTE S AP1 4 LB 4 LB 4 F/:MM 4 V 0 L::T 4 CTS 4 CTS 4 CTi:S 4 CTS 4 PCT 4 PC:T 4 C/C 4 * DATA RECORD CTYPE# 994 BYTES * DEPTH GR TTEN CCL S S N C SSN CN CNC CNRA 985:0. 000 0.0000000 0,0000000 . _ TEN LSN -200.0000 SPD CLSN ,. 0.0000000 9800. 000 24. 50125 O, 0000000 1'94,6839 29.67734 30,82834 9750.000 16,39552 O. 0000000 21 $, 5138 21.91039 23,45531 1013,853 '194.6839 0.7429171E-01 1017.930 218.5138 0,9088337E-01 9700. 000 22.62921 101~1 , 295 O. 0000000 2 58,8?23 25 8, 8723 1~, 0-1328. 17.02617 0. 1143187 9650,000 5~,20581 0.0000000 261-$442 23.83456 25,2687? 9600. 000 41.01790 0.0000000 277,5728 1 9 . 6:0896 21 , 29768 9550.000 19,02165 0.0000000 231.2572 26.28235 27,58820 1013,119 261,8442 .8601958E-01 1019,549 277,5728 0,97527i44E-01 995,5615 231.2572 0. 8060229E-01 9500.000 28.59956 1014.520 0.0000000 275.6865 275.6865 1~7,57625 19,40227 0,1042908 9450,000 46.56827 0.0000000 250.7944 18,95518 20,68'701 998,8823 250~7944 ,9960276 9400,000 44.64932 998,2798 O, 0000000 402. 2646 402. 2646 5,.~42499 8.649786 0,1766426 9350.000 61,58366 997-0522 O. 0000000 216. 1042 21 6. 1042 28-40318 29,6091 3 0,7651138 9300.000 51.17000 0,0000000 319.3196 1:3.66968 15.78667 9250-000 43.31908 O, 0000000 131 .1876 78.91 577 80. 84872 9200,000 511~06645 0,0000.000 146.8386 78,34137 80.23254 E-01 E-01 971.2749 319.3196 0,1204087 973.2585 131,1876 0,4463544E-01 0,0000000 146,8386 0,4475340E-01 133.4015 57,85358 49.83609 79,43706 21.96489 118.3757 7.471890 90.09491 10.00309 108.2838 4.784840 74.55942 10,37854 115.0062 -4.345029 99.91924 3.218360 284.2283 0.7682953 66.13777 -1,437465 153.7954 0.2833452 23,42249 -200,0000 26.28612 28.99710 14.46340 28.99710 19.85927 28.99710 29.59393 28.99710 22.52373 28.99710 27.07095 28.99710 18.63986 28,99710 28.75156 28.99710 24.97981 29.65201 71.05707 28.99710 16.53444 25.99710 38.44885 28.99710 5.855618 O.O000OO0 6.571527 IOTAL DATA RECORDS : STAR.TING TAPE DEPTH= **** FILE~ TRAILER **** 71 9850,00 E NDI N G TAPE DEPTH = 9180.00 **** TAPE TRAILER **** L[S 89/10/11 TOTAL RECORDS IN THIS LOGICAE TAPE : 300 **** REEL TRAILER **** LIS 89tl 0/11 ATLAS 01 TOTAL RECORDS ~.N THIS LOGICAL REEL : 301 TOTAL RECORDS I.N THIS PHYSICAL. REEL: 301 Enid of exe. c'u~ion: T::~u- 16 N0¥ 89 2:38D EIap.~$ed. e.~e'-¢-u~on t-ime~ = I m±nu~e , 17.~.0 seconds. SYSTEM RETURN CODE = 0