Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAboutKuparuk River CPF 2 - ConocoPhillips Alaska, IncPercentComm.Comm.STATE OF ALASKAALASKA OIL AND GAS CONSERVATION COMMISSIONFACILITY REPORT OF PRODUCED GAS DISPOSITIONDispositionVolume MCF20. For production from multiple pools, list contribution of each pool as a percent of Total Volume.6. SoldPool NamePool Code7. Reinjected8. Flared or vented 1 hour or less12. Fuel gas used in lease operationsAOGCC Use OnlyAuthorization >1 hr:9. Flared or vented more than 1 hour (see instr.)10. Pilot and Purge11. Assist GasSafety:MCF13. Other (see instructions)Lease Use:MCF14. TOTAL VOLUME (ITEMS 6-13)Conservation:MCF15. NGL Gas EquivalentWaste:MCF16. Purchased gas1. Facility Number 2. Facility Name3. Field4. Operator5. Month/Year of DispositionReviewed by:COMMISSIONERAuthorized Name and Digital Signature with date:I hereby certify that the foregoing is true and correct to the best of my knowledge.Contact Phone:Contact Email:Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60° F. Authority 20 AAC 25.235.Revision? Date of Revision:Title:19. Remarks:17. Transferred from:18. Transferred to: (Express as a negative #)Form 10‐422    Revised 10/2021 20 AAC 25.235Submit in PDF format toaogcc.reporting@alaska.gov0290000022 Central Processing Facility #2Kuparuk River Unit CONOCOPHILLIPS 01/20231,5001,861,598139018,9490122,66902,004,85500525,3990 Reinjected vol does not include volumes of PBU NGLS acquired for LSEOR reflected on line 17. Transferred from = PBU LSEOR NGLs 0 and CPF1 transferred 525,399. Line 6 is gas sold to KTC.KUPARUKRIVER UNIT49010091.27KUPARUK RIVER UNIT MELTWATER4901400.00KUPARUK RIVER UNIT TARN4901608.39KUPARUK RIVER UNIT TABASCO4901650.35Analyst, Production & Revenue Accounting (918) 661-8373laurie.beavers@cop.com 1/31/2023 CONSERVATION ORDER NO. 219 GAS FLARING OR VENTING INCIDENTS CPF #2 January-2023 PLANNED DATE TIME VOLUME MSCF DESCRIPTION OF FLARING EVENT UNPLANNED ACTION TAKEN TO MINIMIZE VOLUME FLARING OR VENTING EVENTS GREATER THAN 1 HOUR 0 TOTAL OVER 1 HOUR 0 Planned > 1 Hour 0 PLANNED EVENTS LESS THAN 1 HOUR Flare or Vent Volumes: Greater than 1 hour 0 Less than 1 hour 139 Continuous Assist 0 Pilot and Purge 18,949 TOTAL FLARED/VENTED 19,088 PercentComm.Comm.STATE OF ALASKAALASKA OIL AND GAS CONSERVATION COMMISSIONFACILITY REPORT OF PRODUCED GAS DISPOSITIONDispositionVolume MCF20. For production from multiple pools, list contribution of each pool as a percent of Total Volume.6. SoldPool NamePool Code7. Reinjected8. Flared or vented 1 hour or less12. Fuel gas used in lease operationsAOGCC Use OnlyAuthorization >1 hr:9. Flared or vented more than 1 hour (see instr.)10. Pilot and Purge11. Assist GasSafety:MCF13. Other (see instructions)Lease Use:MCF14. TOTAL VOLUME (ITEMS 6-13)Conservation:MCF15. NGL Gas EquivalentWaste:MCF16. Purchased gas1. Facility Number 2. Facility Name3. Field4. Operator5. Month/Year of DispositionReviewed by:COMMISSIONERAuthorized Name and Digital Signature with date:I hereby certify that the foregoing is true and correct to the best of my knowledge.Contact Phone:Contact Email:Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60° F. Authority 20 AAC 25.235.Revision? Date of Revision:Title:19. Remarks:17. Transferred from:18. Transferred to: (Express as a negative #)Form 10‐422    Revised 10/2021 20 AAC 25.235Submit in PDF format toaogcc.reporting@alaska.gov0290000022 Central Processing Facility #2Kuparuk River Unit CONOCOPHILLIPS 02/20231,4461,577,180378018,1110154,34801,751,46300450,2110 Reinjected vol does not include volumes of PBU NGLS acquired for LSEOR reflected on line 17. Transferred from = PBU LSEOR NGLs 0 and CPF1 transferred 450,211. Line 6 is gas sold to KTC.KUPARUKRIVER UNIT49010090.57KUPARUK RIVER UNIT MELTWATER4901400.00KUPARUK RIVER UNIT TARN4901609.01KUPARUK RIVER UNIT TABASCO4901650.41Analyst, Production & Revenue Accounting (918) 661-8373laurie.beavers@cop.com 2/28/2023 CONSERVATION ORDER NO. 219 GAS FLARING OR VENTING INCIDENTS CPF #2 #REF! PLANNED DATE TIME VOLUME MSCF DESCRIPTION OF FLARING EVENT UNPLANNED ACTION TAKEN TO MINIMIZE VOLUME FLARING OR VENTING EVENTS GREATER THAN 1 HOUR 0 TOTAL OVER 1 HOUR 0 Planned > 1 Hour 0 PLANNED EVENTS LESS THAN 1 HOUR Flare or Vent Volumes: Greater than 1 hour 0 Less than 1 hour 378 Continuous Assist 0 Pilot and Purge 18,111 TOTAL FLARED/VENTED 18,489 PercentComm.Comm.STATE OF ALASKAALASKA OIL AND GAS CONSERVATION COMMISSIONFACILITY REPORT OF PRODUCED GAS DISPOSITIONDisposition Volume MCF20. For production from multiple pools, list contribution of each pool as a percent of Total Volume.6. SoldPool Name Pool Code7. Reinjected8. Flared or vented 1 hour or less12. Fuel gas used in lease operationsAOGCC Use OnlyAuthorization >1 hr:9. Flared or vented more than 1 hour (see instr.)10. Pilot and Purge11. Assist GasSafety: MCF13. Other (see instructions)Lease Use: MCF14. TOTAL VOLUME (ITEMS 6-13)Conservation: MCF15. NGL Gas EquivalentWaste: MCF16. Purchased gas1. Facility Number 2. Facility Name 3. Field 4. Operator 5. Month/Year of DispositionReviewed by:COMMISSIONERAuthorized Name and Digital Signature with date:I hereby certify that the foregoing is true and correct to the best of my knowledge.Contact Phone:Contact Email:Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60° F. Authority 20 AAC 25.235.Revision? Date of Revision:Title:19. Remarks:17. Transferred from:18. Transferred to: (Express as a negative #)Form10Ͳ422Revised10/2021 20AAC25.235SubmitinPDFformattoaogcc.reporting@alaska.gov0290000022Central Processing Facility #2Kuparuk River Unit CONOCOPHILLIPS 03/20231,5851,313,378283020,9430153,21901,489,40800505,7090 Reinjected vol does not include volumes of PBU NGLS acquired for LSEOR reflected on line 17. Transferred from = PBU LSEOR NGLs 0 and CPF1 transferred 505,709. Line 6 is gas sold to KTC.KUPARUKRIVER UNIT 490100 88.42KUPARUK RIVER UNIT MELTWATER4901400.00KUPARUK RIVER UNIT TARN 490160 11.18KUPARUK RIVER UNIT TABASCO 4901650.40Analyst, Production & Revenue Accounting (918) 661-8373laurie.beavers@cop.com 3/31/2023CONSERVATION ORDER NO. 219GAS FLARING OR VENTING INCIDENTSCPF #2March-2023PLANNEDDATETIMEVOLUME MSCFDESCRIPTION OF FLARING EVENTUNPLANNEDACTION TAKEN TO MINIMIZE VOLUMEFLARING OR VENTING EVENTS GREATER THAN 1 HOUR0TOTAL OVER 1 HOUR0Planned > 1 Hour0PLANNED EVENTS LESS THAN 1 HOURFlare or Vent Volumes:Greater than 1 hour0Less than 1 hour283Continuous Assist0Pilot and Purge20,943TOTAL FLARED/VENTED21,226 PercentComm.Comm.STATE OF ALASKAALASKA OIL AND GAS CONSERVATION COMMISSIONFACILITY REPORT OF PRODUCED GAS DISPOSITIONDisposition Volume MCF20.For production from multiple pools, list contribution of each pool as a percent ofTotal Volume.6. SoldPool Name Pool Code7. Reinjected8. Flared or vented 1 hour or less12. Fuel gas used in lease operationsAOGCC Use OnlyAuthorization >1 hr:9. Flared or vented more than 1 hour (see instr.)10. Pilot and Purge11. Assist GasSafety: MCF13. Other (see instructions)Lease Use: MCF14. TOTAL VOLUME (ITEMS 6-13)Conservation: MCF15. NGL Gas EquivalentWaste: MCF16. Purchased gas1. Facility Number2. Facility Name3. Field 4.Operator5. Month/Year of DispositionReviewed by:COMMISSIONERAuthorized Name and Digital Signature with date:I hereby certify that the foregoing is true and correct to the best of my knowledge.Contact Phone:Contact Email:Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60° F. Authority 20 AAC 25.235.Revision? Date of Revision:Title:19. Remarks:17. Transferred from:18. Transferred to: (Express as a negative #)Form10Ͳ422Revised10/2021 20AAC25.235SubmitinPDFformattoaogcc.reporting@alaska.gov0290000022Central Processing Facility #2Kuparuk River Unit CONOCOPHILLIPS 04/20231,3871,116,784-42318,7390120,88401,257,81300504,0540Reinjected vol does not include volumes of PBU NGLS acquired for LSEOR reflected on line 17. Transferred from = PBU LSEOR NGLs 0 andCPF1 transferred 504,054. Line 6 is gas sold to KTC.KUPARUKRIVER UNIT 490100 84.91KUPARUK RIVER UNIT MELTWATER4901400.00KUPARUK RIVER UNIT TARN 490160 14.59KUPARUK RIVER UNIT TABASCO 4901650.50Analyst, Production & Revenue Accounting (918) 661-8373laurie.beavers@cop.com:&%*&:JLC 12/7/2023Brett W. Huber, Sr.Digitally signed by Brett W. Huber, Sr. Date: 2023.12.11 12:05:58 -09'00' 4/30/2023CONSERVATION ORDER NO. 219GAS FLARING OR VENTING INCIDENTSCPF #2#REF!PLANNEDDATETIMEVOLUME MSCFDESCRIPTION OF FLARING EVENTUNPLANNEDACTION TAKEN TO MINIMIZE VOLUMEFLARING OR VENTING EVENTS GREATER THAN 1 HOUR4/2/202301:40:00 PM - 03:30:00 PM 23Instrument techs did a PM on the PW tank VRU to verify instrument calibrationYThis test was to prevent future shutdownsTOTAL OVER 1 HOUR23Planned > 1 Hour23PLANNED EVENTS LESS THAN 1 HOURFlare or Vent Volumes:Greater than 1 hour23Less than 1 hour-4Continuous Assist0Pilot and Purge18,739TOTAL FLARED/VENTED18,758 PercentComm.Comm.STATE OF ALASKAALASKA OIL AND GAS CONSERVATION COMMISSIONFACILITY REPORT OF PRODUCED GAS DISPOSITIONDispositionVolume MCF20. For production from multiple pools, list contribution of each pool as a percent of Total Volume.6. SoldPool NamePool Code7. Reinjected8. Flared or vented 1 hour or less12. Fuel gas used in lease operationsAOGCC Use OnlyAuthorization >1 hr:9. Flared or vented more than 1 hour (see instr.)10. Pilot and Purge11. Assist GasSafety:MCF13. Other (see instructions)Lease Use:MCF14. TOTAL VOLUME (ITEMS 6-13)Conservation:MCF15. NGL Gas EquivalentWaste:MCF16. Purchased gas1. Facility Number 2. Facility Name3. Field4. Operator5. Month/Year of DispositionReviewed by:COMMISSIONERAuthorized Name and Digital Signature with date:I hereby certify that the foregoing is true and correct to the best of my knowledge.Contact Phone:Contact Email:Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60° F. Authority 20 AAC 25.235.Revision? Date of Revision:Title:19. Remarks:17. Transferred from:18. Transferred to: (Express as a negative #)Form 10‐422    Revised 10/2021 20 AAC 25.235Submit in PDF format toaogcc.reporting@alaska.gov0290000022 Central Processing Facility #2Kuparuk River Unit CONOCOPHILLIPS 05/20233,119937,06688020,3510555,29101,515,9150092,3790 Reinjected vol does not include volumes of PBU NGLS acquired for LSEOR reflected on line 17. Transferred from = PBU LSEOR NGLs 0 and CPF1 transferred 92,379. Line 6 is gas sold to KTC.KUPARUKRIVER UNIT49010085.56KUPARUK RIVER UNIT MELTWATER4901400.00KUPARUK RIVER UNIT TARN49016014.06KUPARUK RIVER UNIT TABASCO4901650.38Analyst, Production & Revenue Accounting (918) 661-8373laurie.beavers@cop.com 5/31/2023 CONSERVATION ORDER NO. 219 GAS FLARING OR VENTING INCIDENTS CPF #2 #REF! PLANNED DATE TIME VOLUME MSCF DESCRIPTION OF FLARING EVENT UNPLANNED ACTION TAKEN TO MINIMIZE VOLUME FLARING OR VENTING EVENTS GREATER THAN 1 HOUR 0 TOTAL OVER 1 HOUR 0 Planned > 1 Hour 0 PLANNED EVENTS LESS THAN 1 HOUR Flare or Vent Volumes: Greater than 1 hour 0 Less than 1 hour 88 Continuous Assist 0 Pilot and Purge 20,351 TOTAL FLARED/VENTED 20,439 PercentComm.Comm.STATE OF ALASKAALASKA OIL AND GAS CONSERVATION COMMISSIONFACILITY REPORT OF PRODUCED GAS DISPOSITIONDisposition Volume MCF20.For production from multiple pools, list contribution of each pool as a percent ofTotal Volume.6. SoldPool Name Pool Code7. Reinjected8. Flared or vented 1 hour or less12. Fuel gas used in lease operationsAOGCC Use OnlyAuthorization >1 hr:9. Flared or vented more than 1 hour (see instr.)10. Pilot and Purge11. Assist GasSafety: MCF13. Other (see instructions)Lease Use: MCF14. TOTAL VOLUME (ITEMS 6-13)Conservation: MCF15. NGL Gas EquivalentWaste: MCF16. Purchased gas1. Facility Number 2. Facility Name 3. Field 4. Operator 5. Month/Year of DispositionReviewed by:COMMISSIONERAuthorized Name and Digital Signature with date:I hereby certify that the foregoing is true and correct to the best of my knowledge.Contact Phone:Contact Email:Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60° F. Authority 20 AAC 25.235.Revision? Date of Revision:Title:19. Remarks:17. Transferred from:18. Transferred to: (Express as a negative #)Form10Ͳ422Revised10/2021 20AAC25.235SubmitinPDFformattoaogcc.reporting@alaska.gov0290000022Central Processing Facility #2Kuparuk River Unit CONOCOPHILLIPS 06/20231,5341,515,2164746119,1970227,10901,763,59100338,9380Reinjected vol does not include volumes of PBU NGLS acquired for LSEOR reflected on line 17. Transferred from = PBU LSEOR NGLs 0 andCPF1 transferred 338,938. Line 6 is gas sold to KTC.KUPARUKRIVER UNIT 490100 87.82KUPARUK RIVER UNIT MELTWATER4901400.00KUPARUK RIVER UNIT TARN 490160 11.86KUPARUK RIVER UNIT TABASCO 4901650.32Analyst, Production & Revenue Accounting (918) 661-8373laurie.beavers@cop.com:&%*&:JLC 12/7/2023Brett W. Huber, Sr.Digitally signed by Brett W. Huber, Sr. Date: 2023.12.11 12:17:49 -09'00' 6/30/2023CONSERVATION ORDER NO. 219GAS FLARING OR VENTING INCIDENTSCPF #2#REF!PLANNEDDATE TIME VOLUME MSCF DESCRIPTION OF FLARING EVENT UNPLANNEDACTION TAKEN TO MINIMIZEVOLUMEFLARING OR VENTING EVENTS GREATER THAN 1 HOUR6/3/202306:34:00 PM - 08:32:00 PM 16PAH-5000 (Source water tank pressure) tripped on false high (12" w.c) then the LIP VRU tripped as a resultNInstrument techs were called out on night to troubleshoot/resolve the issue. The instrument malfunction was attributed to liquid in the sensing line. the LIP VRU was restarted approx 2 hrs later.6/30/202312:45:00 PM - 05:30:00 PM 45The LIP VRU tripped on low suction pressure and required troubleshooting before restarting.NStabilized suction pressure and executed troubleshooting for equipment external fault. TOTAL OVER 1 HOUR62Planned > 1 Hour0PLANNED EVENTS LESS THAN 1 HOURFlare or Vent Volumes:Greater than 1 hour61Less than 1 hour474Continuous Assist0Pilot and Purge19,197TOTAL FLARED/VENTED19,732 PercentComm.Comm.STATE OF ALASKAALASKA OIL AND GAS CONSERVATION COMMISSIONFACILITY REPORT OF PRODUCED GAS DISPOSITIONDisposition Volume MCF20. For production from multiple pools, list contribution of each pool as a percent of Total Volume.6. SoldPool Name Pool Code7. Reinjected8. Flared or vented 1 hour or less12. Fuel gas used in lease operationsAOGCC Use OnlyAuthorization >1 hr:9. Flared or vented more than 1 hour (see instr.)10. Pilot and Purge11. Assist GasSafety: MCF13. Other (see instructions)Lease Use: MCF14. TOTAL VOLUME (ITEMS 6-13)Conservation: MCF15. NGL Gas EquivalentWaste: MCF16. Purchased gas1. Facility Number 2. Facility Name 3. Field 4. Operator 5. Month/Year of DispositionReviewed by:COMMISSIONERAuthorized Name and Digital Signature with date:I hereby certify that the foregoing is true and correct to the best of my knowledge.Contact Phone:Contact Email:Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60° F. Authority 20 AAC 25.235.Revision? Date of Revision:Title:19. Remarks:17. Transferred from:18. Transferred to: (Express as a negative #)Form10Ͳ422Revised10/2021 20AAC25.235SubmitinPDFformattoaogcc.reporting@alaska.gov0290000022Central Processing Facility #2Kuparuk River Unit CONOCOPHILLIPS 07/20231,1711,153,09363019,4260133,48401,307,23700444,3900 Reinjected vol does not include volumes of PBU NGLS acquired for LSEOR reflected on line 17. Transferred from = PBU LSEOR NGLs 0 and CPF1 transferred 444,390. Line 6 is gas sold to KTC.KUPARUKRIVER UNIT 490100 84.66KUPARUK RIVER UNIT MELTWATER4901400.00KUPARUK RIVER UNIT TARN 490160 14.91KUPARUK RIVER UNIT TABASCO 4901650.43Analyst, Production & Revenue Accounting (918) 661-8373laurie.beavers@cop.com PercentComm.Comm.STATE OF ALASKAALASKA OIL AND GAS CONSERVATION COMMISSIONFACILITY REPORT OF PRODUCED GAS DISPOSITIONDisposition Volume MCF20.For production from multiple pools, list contribution of each pool as a percent ofTotal Volume.6. SoldPool Name Pool Code7. Reinjected8. Flared or vented 1 hour or less12. Fuel gas used in lease operationsAOGCC Use OnlyAuthorization >1 hr:9. Flared or vented more than 1 hour (see instr.)10. Pilot and Purge11. Assist GasSafety: MCF13. Other (see instructions)Lease Use: MCF14. TOTAL VOLUME (ITEMS 6-13)Conservation: MCF15. NGL Gas EquivalentWaste: MCF16. Purchased gas1. Facility Number 2. Facility Name 3. Field 4. Operator 5. Month/Year of DispositionReviewed by:COMMISSIONERAuthorized Name and Digital Signature with date:I hereby certify that the foregoing is true and correct to the best of my knowledge.Contact Phone:Contact Email:Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60° F. Authority 20 AAC 25.235.Revision? Date of Revision:Title:19. Remarks:17. Transferred from:18. Transferred to: (Express as a negative #)Form10Ͳ422Revised10/2021 20AAC25.235SubmitinPDFformattoaogcc.reporting@alaska.gov0290000022Central Processing Facility #2Kuparuk River Unit CONOCOPHILLIPS 08/20231,6121,023,8761,4146,88721,9970220,64201,276,42800352,6340Reinjected vol does not include volumes of PBU NGLS acquired for LSEOR reflected on line 17. Transferred from = PBU LSEOR NGLs 0 andCPF1 transferred 352,634. Line 6 is gas sold to KTC.KUPARUKRIVER UNIT 490100 87.43KUPARUK RIVER UNIT MELTWATER4901400.00KUPARUK RIVER UNIT TARN 490160 12.17KUPARUK RIVER UNIT TABASCO 4901650.40Analyst, Production & Revenue Accounting (918) 661-8373laurie.beavers@cop.com:&%*&:JLC 12/7/2023Brett W. Huber, Sr.Digitally signed by Brett W. Huber, Sr. Date: 2023.12.11 12:31:43 -09'00' 8/31/2023CONSERVATION ORDER NO. 219GAS FLARING OR VENTING INCIDENTSCPF #2#REF!PLANNEDDATETIMEVOLUME MSCFDESCRIPTION OF FLARING EVENTUNPLANNEDACTION TAKEN TO MINIMIZEVOLUMEFLARING OR VENTING EVENTS GREATER THAN 1 HOUR8/5/202312:23:00 PM - 01:51:00 PM 2,475D-GLC 2nd stage suction throttle valveposition read back failure wich caused thecompressor to shut down.NShut in oil wells to decrease the incoming gas to the facility, and got another gas lift compressor running. 8/16/202304:55:00 PM - 06:41:00 PM 258High ambient temperatures and lack of support from GEX compressor led to flaring. NProduction shut in to get off flare. 8/16/202307:03:00 PM - 09:02:00 PM 785High ambient temperatures and lack of support from GEX compressor led to flaring. NProduction shut in to get off flare. 8/26/202309:51:00 AM - 11:48:00 AM 3,346While powering down "C" GLC for the plc upgrades, "B" glc tripped on high vibs due to the fuse on the primary vib being blown. NShut in wells, opened up throttling valves on GEX, and attempted restarts on "B" GLC. 8/31/202309:50:00 AM - 12:18:00 PM 23THis was a planned outage to perform and complete oil change (PM's) no abnormal conditions occurred. "LIP VRC"YCareful consideration before taking Unit offline.Production process was stable and adequate to perform maintenance.TOTAL OVER 1 HOUR6,887Planned > 1 Hour23PLANNED EVENTS LESS THAN 1 HOURFlare or Vent Volumes:Greater than 1 hour6,887Less than 1 hour1,414Continuous Assist0Pilot and Purge21,997TOTAL FLARED/VENTED30,298 PercentComm.Comm.STATE OF ALASKAALASKA OIL AND GAS CONSERVATION COMMISSIONFACILITY REPORT OF PRODUCED GAS DISPOSITIONDisposition Volume MCF20. For production from multiple pools, list contribution of each pool as a percent of Total Volume.6. SoldPool Name Pool Code7. Reinjected8. Flared or vented 1 hour or less12. Fuel gas used in lease operationsAOGCC Use OnlyAuthorization >1 hr:9. Flared or vented more than 1 hour (see instr.)10. Pilot and Purge11. Assist GasSafety: MCF13. Other (see instructions)Lease Use: MCF14. TOTAL VOLUME (ITEMS 6-13)Conservation: MCF15. NGL Gas EquivalentWaste: MCF16. Purchased gas1. Facility Number 2. Facility Name 3. Field 4. Operator 5. Month/Year of DispositionReviewed by:COMMISSIONERAuthorized Name and Digital Signature with date:I hereby certify that the foregoing is true and correct to the best of my knowledge.Contact Phone:Contact Email:Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60° F. Authority 20 AAC 25.235.Revision? Date of Revision:Title:19. Remarks:17. Transferred from:18. Transferred to: (Express as a negative #)Form10Ͳ422Revised10/2021 20AAC25.235SubmitinPDFformattoaogcc.reporting@alaska.gov0290000022Central Processing Facility #2Kuparuk River Unit CONOCOPHILLIPS 09/20231,2301,153,9291,299018,215056,78001,231,45300442,6280 Reinjected vol does not include volumes of PBU NGLS acquired for LSEOR reflected on line 17. Transferred from = PBU LSEOR NGLs 0 and CPF1 transferred 442,628. Line 6 is gas sold to KTC.KUPARUKRIVER UNIT 490100 86.42KUPARUK RIVER UNIT MELTWATER4901400.00KUPARUK RIVER UNIT TARN 490160 12.71KUPARUK RIVER UNIT TABASCO 4901650.87Analyst, Production & Revenue Accounting (918) 661-8373laurie.beavers@cop.com 9/30/2023CONSERVATION ORDER NO. 219GAS FLARING OR VENTING INCIDENTSCPF #2September-2023PLANNEDDATETIMEVOLUME MSCFDESCRIPTION OF FLARING EVENTUNPLANNEDACTION TAKEN TO MINIMIZE VOLUMEFLARING OR VENTING EVENTS GREATER THAN 1 HOUR0TOTAL OVER 1 HOUR0Planned > 1 Hour0PLANNED EVENTS LESS THAN 1 HOURFlare or Vent Volumes:Greater than 1 hour0Less than 1 hour1,299Continuous Assist0Pilot and Purge18,215TOTAL FLARED/VENTED19,514 PercentComm.Comm.STATE OF ALASKAALASKA OIL AND GAS CONSERVATION COMMISSIONFACILITY REPORT OF PRODUCED GAS DISPOSITIONDisposition Volume MCF20.For production from multiple pools, list contribution of each pool as a percent ofTotal Volume.6. SoldPool Name Pool Code7. Reinjected8. Flared or vented 1 hour or less12. Fuel gas used in lease operationsAOGCC Use OnlyAuthorization >1 hr:9. Flared or vented more than 1 hour (see instr.)10. Pilot and Purge11. Assist GasSafety: MCF13. Other (see instructions)Lease Use: MCF14. TOTAL VOLUME (ITEMS 6-13)Conservation: MCF15. NGL Gas EquivalentWaste: MCF16. Purchased gas1. Facility Number 2. Facility Name 3. Field 4. Operator 5. Month/Year of DispositionReviewed by:COMMISSIONERAuthorized Name and Digital Signature with date:I hereby certify that the foregoing is true and correct to the best of my knowledge.Contact Phone:Contact Email:Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60° F. Authority 20 AAC 25.235.Revision? Date of Revision:Title:19. Remarks:17. Transferred from:18. Transferred to: (Express as a negative #)Form 10Ͳ422Revised 10/2021 20 AAC 25.235Submit in PDF format toaogcc.reporting@alaska.gov0290000022Central Processing Facility #2Kuparuk River Unit CONOCOPHILLIPS 10/20231,5431,713,9774613,54512,2490106,88201,838,65700421,6080Reinjected vol does not include volumes of PBU NGLS acquired for LSEOR reflected on line 17. Transferred from = PBU LSEOR NGLs 0 andCPF1 transferred 421,608. Line 6 is gas sold to KTC.KUPARUKRIVER UNIT 490100 88.13KUPARUK RIVER UNIT MELTWATER4901400.00KUPARUK RIVER UNIT TARN 490160 11.49KUPARUK RIVER UNIT TABASCO 4901650.37Analyst, Production & Revenue Accounting (918) 661-8373laurie.beavers@cop.com:&%CWa08/16/2024JLC 8/15/2024 10/31/2023CONSERVATION ORDER NO. 219GAS FLARING OR VENTING INCIDENTSCPF #2#REF!PLANNEDDATE TIME VOLUME MSCF DESCRIPTION OF FLARING EVENT UNPLANNEDACTION TAKEN TO MINIMIZE VOLUMEFLARING OR VENTING EVENTS GREATER THAN 1 HOUR10/4/202303:51:00 PM - 05:21:00 PM 1,227 Process upset in gas section of facilityNLoaded D-GLC 1st and 2nd stage fully, reduced inlet production and applied methanol to the dew point coolers10/4/202306:47:00 PM - 09:02:00 PM 2,308 Process upset in gas section of facilityNReduced gas inlet production and applied methanol to dew point coolers10/16/202307:07:00 AM - 08:25:00 AM 10LIP VRC control cabinet cooling fans replaced. YWell planned maintenance to minimize duration unit was down. TOTAL OVER 1 HOUR3,545Planned > 1 Hour10PLANNED EVENTS LESS THAN 1 HOURFlare or Vent Volumes:Greater than 1 hour3,545Less than 1 hour461Continuous Assist0Pilot and Purge12,249TOTAL FLARED/VENTED16,255 PercentComm.Comm.STATE OF ALASKAALASKA OIL AND GAS CONSERVATION COMMISSIONFACILITY REPORT OF PRODUCED GAS DISPOSITIONDispositionVolume MCF20. For production from multiple pools, list contribution of each pool as a percent of Total Volume.6. SoldPool NamePool Code7. Reinjected8. Flared or vented 1 hour or less12. Fuel gas used in lease operationsAOGCC Use OnlyAuthorization >1 hr:9. Flared or vented more than 1 hour (see instr.)10. Pilot and Purge11. Assist GasSafety:MCF13. Other (see instructions)Lease Use:MCF14. TOTAL VOLUME (ITEMS 6-13)Conservation:MCF15. NGL Gas EquivalentWaste:MCF16. Purchased gas1. Facility Number 2. Facility Name3. Field4. Operator5. Month/Year of DispositionReviewed by:COMMISSIONERAuthorized Name and Digital Signature with date:I hereby certify that the foregoing is true and correct to the best of my knowledge.Contact Phone:Contact Email:Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60° F. Authority 20 AAC 25.235.Revision? Date of Revision:Title:19. Remarks:17. Transferred from:18. Transferred to: (Express as a negative #)Form 10‐422    Revised 10/2021 20 AAC 25.235Submit in PDF format toaogcc.reporting@alaska.gov0290000022 Central Processing Facility #2Kuparuk River Unit CONOCOPHILLIPS 11/20231,8611,514,715220018,0780105,05601,639,93000413,9850 Reinjected vol does not include volumes of PBU NGLS acquired for LSEOR reflected on line 17. Transferred from = PBU LSEOR NGLs 0 and CPF1 transferred 413,895. Line 6 is gas sold to KTC.KUPARUKRIVER UNIT49010086.71KUPARUK RIVER UNIT MELTWATER4901400.00KUPARUK RIVER UNIT TARN49016012.94KUPARUK RIVER UNIT TABASCO4901650.34Analyst, Production & Revenue Accounting (918) 661-8373laurie.beavers@cop.com 11/30/2023 CONSERVATION ORDER NO. 219 GAS FLARING OR VENTING INCIDENTS CPF #2 #REF! PLANNED DATE TIME VOLUME MSCF DESCRIPTION OF FLARING EVENT UNPLANNED ACTION TAKEN TO MINIMIZE VOLUME FLARING OR VENTING EVENTS GREATER THAN 1 HOUR 0 TOTAL OVER 1 HOUR 0 Planned > 1 Hour 0 PLANNED EVENTS LESS THAN 1 HOUR Flare or Vent Volumes: Greater than 1 hour 0 Less than 1 hour 220 Continuous Assist 0 Pilot and Purge 18,078 TOTAL FLARED/VENTED 18,298 PercentComm.Comm.STATE OF ALASKAALASKA OIL AND GAS CONSERVATION COMMISSIONFACILITY REPORT OF PRODUCED GAS DISPOSITIONDisposition Volume MCF20.For production from multiple pools, list contribution of each pool as a percent ofTotal Volume.6. SoldPool Name Pool Code7. Reinjected8. Flared or vented 1 hour or less12. Fuel gas used in lease operationsAOGCC Use OnlyAuthorization >1 hr:9. Flared or vented more than 1 hour (see instr.)10. Pilot and Purge11. Assist GasSafety: MCF13. Other (see instructions)Lease Use: MCF14. TOTAL VOLUME (ITEMS 6-13)Conservation: MCF15. NGL Gas EquivalentWaste: MCF16. Purchased gas1. Facility Number 2. Facility Name 3. Field 4. Operator 5. Month/Year of DispositionReviewed by:COMMISSIONERAuthorized Name and Digital Signature with date:I hereby certify that the foregoing is true and correct to the best of my knowledge.Contact Phone:Contact Email:Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60° F. Authority 20 AAC 25.235.Revision? Date of Revision:Title:19. Remarks:17. Transferred from:18. Transferred to: (Express as a negative #)Form 10Ͳ422Revised 10/2021 20 AAC 25.235Submit in PDF format toaogcc.reporting@alaska.gov0290000022Central Processing Facility #2Kuparuk River Unit CONOCOPHILLIPS 12/20231,5491,990,9308723,89219,809010,14402,027,19600464,7330Reinjected vol does not include volumes of PBU NGLS acquired for LSEOR reflected on line 17. Transferred from = PBU LSEOR NGLs 0 andCPF1 transferred 464,733. Line 6 is gas sold to KTC.KUPARUKRIVER UNIT 490100 89.12KUPARUK RIVER UNIT MELTWATER4901400.00KUPARUK RIVER UNIT TARN 490160 10.62KUPARUK RIVER UNIT TABASCO 4901650.26Analyst, Production & Revenue Accounting (918) 661-8373laurie.beavers@cop.com:&%C:08/16/2024JLC 8/15/2024 12/31/2023CONSERVATION ORDER NO. 219GAS FLARING OR VENTING INCIDENTSCPF #2#REF!PLANNEDDATETIMEVOLUME MSCFDESCRIPTION OF FLARING EVENTUNPLANNEDACTION TAKEN TO MINIMIZE VOLUMEFLARING OR VENTING EVENTS GREATER THAN 1 HOUR12/27/202306:05:00 AM - 08:11:00 AM 3,892B-GLC 1st stage discharge temp TIT-1035B2 failure on the B channel whichcaused the compressor to shut down.NBypassed channel B on TIT-1035B2 transmitter and restarted compressorTOTAL OVER 1 HOUR 3,892Planned > 1 Hour0PLANNED EVENTS LESS THAN 1 HOURFlare or Vent Volumes:Greater than 1 hour 3,892Less than 1 hour 872Continuous Assist 0Pilot and Purge 19,809TOTAL FLARED/VENTED 24,573