HomeMy WebLinkAboutPBU Lisburne (GPMA) - Hilcorp North Slope, LLC2. Facility NamePBU LISBURNE PROD (GPMA)Percent67.6%0.4%25.7%0.0%5.8%0.0%0.0%MCFCOMMISSIONER19. Remarks:Pt McIntyre NGLs at CGF gas equivalent = 28,238Authorized Name and Digital Signature with date:Contact Phone:713-289-2981Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60° F. Authority 20 AAC 25.235.Contact Email:sdenton@hilcorp.comBlock 13: Lift Gas Off Field; Block 17: MI from Prudhoe = 2,493,349 and Fuel Gas from Prudhoe = 0I hereby certify that the foregoing is true and correct to the best of my knowledge.Revision?Date of Revision:Title:Production Analyst17. Transferred from: (Off-lease Gas)2,493,349 Reviewed by:18. Transferred to:0 Comm.Comm.MCF15. NGL Gas Equivalent155,440ConservationMCF16. Purchased gas:0Waste13. Other (see instructions)3,059,666Official Use OnlyAuthorization >1 hr:SafetyMCF14. TOTAL VOLUME (ITEMS 6-13)13,273,283 Lease Use11. Assist Gas102,69012. Fuel gas used in lease operations960,03610. Pilot and Purge12,195Prudhoe Bay, W Beach Oil6401869. Flared or vented more than 1 hour (see instr.)6,170Prudhoe Bay, Raven Oil640147Prudhoe Bay, W Bch Tr Un WTRSP6401878. Flared or vented 1 hour or less0Prudhoe Bay, Pt Mcintyre Oil640180Prudhoe Bay, Prudhoe Oil640150Pool NamePool Code7. Reinjected8,977,086Prudhoe Bay, Lisburne Oil640144Prudhoe Bay, Niakuk Oil6401480290000009PBU - GPMAHilcorp North Slope LLCJanuary 2023DispositionVolume MCF20.For production from multiple pools, list contribution of each pool as a percent ofTotal Volume.6. Sold155,440STATE OF ALASKAALASKA OIL AND GAS CONSERVATION COMMISSIONFACILITY REPORT OF PRODUCED GAS DISPOSITION1. Facility Number3. Field4. Operator5. Month/Year of DispositionForm 10-422 Revised 10/2021 20 AAC 25.235 Submit in PDF format to aogcc.reporting@alaska.govDigitally signed by Sheila Denton (2293)DN: cn=Sheila Denton (2293), ou=UsersDate: 2023.02.15 07:58:02 -09'00'Sheila Denton (2293):&%*&:JLC 12/7/2023Brett W. Huber, Sr.Digitally signed by Brett W. Huber, Sr. Date: 2023.12.11 11:46:57 -09'00'
Hilcorp Energy Company ALASKACONSERVATION ORDER NO. 219PRUDHOE BAY, PRUDHOELISBURNE PRODUCTION CENTERGAS FLARING INCIDENTSJan-23VOLUME PLANNEDDATE TIME (Mscf) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSETotal Flare <= 1 Hour01/28/20231211-0350 0LP Flare: 1800 compressor shutdown because of control/instrumentation failure associated with new UPS system. Flared off the suction scrubbers of STV and IP through both relief valves, maintain safe pressure coming from plant while troubleshooting and getting turbine compressors fired back up.UCompleted troubleshooting, reloaded 1801 STV/IP Compressor, and stabilized facility process and operation.1/28/20231211-0145 0HP Flare: 1807 and 1808 Reinjection compressors shutdown because of control/instrumentation failure associated with new UPS system. Flared off the HP separator through both relief valves, maintain safe pressure coming into plant while troubleshooting and getting turbine compressors fired back up.UCompleted troubleshooting, reloaded 1807 and 1808 T/C, and stabilized facility process and operation.Total Flare > 1 Hour0Volume Flared 0Measured Safety Pilot 0Continuous Assist 0TOTAL FLARED 0
Hilcorp Energy Company ALASKACONSERVATION ORDER NO. 219PRUDHOE BAY, LISBURNELISBURNE PRODUCTION CENTERGAS FLARING INCIDENTSJan-23VOLUME PLANNEDDATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSETotal Flare <= 1 Hour01/28/20231211-0350 282LP Flare: 1800 compressor shutdown because of control/instrumentation failure associated with new UPS system. Flared off the suction scrubbers of STV and IP through both relief valves, maintain safe pressure coming from plant while troubleshooting and getting turbine compressors fired back up.UCompleted troubleshooting, reloaded 1801 STV/IP Compressor, and stabilized facility process and operation.1/28/20231211-0145 3,724HP Flare: 1807 and 1808 Reinjection compressors shutdown because of control/instrumentation failure associated with new UPS system. Flared off the HP separator through both relief valves, maintain safe pressure coming into plant while troubleshooting and getting turbine compressors fired back up.UCompleted troubleshooting, reloaded 1807 and 1808 T/C, and stabilized facility process and operation.Total Flare > 1 Hour4,006Volume Flared 4,006Measured Safety Pilot 8,243Continuous Assist 69,394TOTAL FLARED 81,643
Hilcorp Energy Company ALASKACONSERVATION ORDER NO. 219PRUDHOE BAY, POINT MCINTYRELISBURNE PRODUCTION CENTERGAS FLARING INCIDENTSJan-23VOLUME PLANNEDDATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSETotal Flare <= 1 Hour01/28/20231211-0350 128LP Flare: 1800 compressor shutdown because of control/instrumentation failure associated with new UPS system. Flared off the suction scrubbers of STV and IP through both relief valves, maintain safe pressure coming from plant while troubleshooting and getting turbine compressors fired back up.UCompleted troubleshooting, reloaded 1801 STV/IP Compressor, and stabilized facility process and operation.1/28/20231211-0145 1,688HP Flare: 1807 and 1808 Reinjection compressors shutdown because of control/instrumentation failure associated with new UPS system. Flared off the HP separator through both relief valves, maintain safe pressure coming into plant while troubleshooting and getting turbine compressors fired back up.UCompleted troubleshooting, reloaded 1807 and 1808 T/C, and stabilized facility process and operation.Total Flare > 1 Hour1,816Volume Flared 1,816Measured Safety Pilot 3,124Continuous Assist 26,328TOTAL FLARED 31,268
Hilcorp Energy Company ALASKACONSERVATION ORDER NO. 219PRUDHOE BAY, WEST BEACHLISBURNE PRODUCTION CENTERGAS FLARING INCIDENTSJan-23VOLUME PLANNEDDATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSETotal Flare <= 1 Hour01/28/20231211-0350 0LP Flare: 1800 compressor shutdown because of control/instrumentation failure associated with new UPS system. Flared off the suction scrubbers of STV and IP through both relief valves, maintain safe pressure coming from plant while troubleshooting and getting turbine compressors fired back up.UCompleted troubleshooting, reloaded 1801 STV/IP Compressor, and stabilized facility process and operation.1/28/20231211-0145 0HP Flare: 1807 and 1808 Reinjection compressors shutdown because of control/instrumentation failure associated with new UPS system. Flared off the HP separator through both relief valves, maintain safe pressure coming into plant while troubleshooting and getting turbine compressors fired back up.UCompleted troubleshooting, reloaded 1807 and 1808 T/C, and stabilized facility process and operation.Total Flare > 1 Hour0Volume Flared 0Measured Safety Pilot 0Continuous Assist 0TOTAL FLARED 0
Hilcorp Energy Company ALASKACONSERVATION ORDER NO. 219PRUDHOE BAY, NORTH PRUDHOE BAYLISBURNE PRODUCTION CENTERGAS FLARING INCIDENTSJan-23VOLUME PLANNEDDATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSETotal Flare <= 1 Hour01/28/20231211-0350 0LP Flare: 1800 compressor shutdown because of control/instrumentation failure associated with new UPS system. Flared off the suction scrubbers of STV and IP through both relief valves, maintain safe pressure coming from plant while troubleshooting and getting turbine compressors fired back up.UCompleted troubleshooting, reloaded 1801 STV/IP Compressor, and stabilized facility process and operation.1/28/20231211-0145 0HP Flare: 1807 and 1808 Reinjection compressors shutdown because of control/instrumentation failure associated with new UPS system. Flared off the HP separator through both relief valves, maintain safe pressure coming into plant while troubleshooting and getting turbine compressors fired back up.UCompleted troubleshooting, reloaded 1807 and 1808 T/C, and stabilized facility process and operation.Total Flare > 1 Hour0Volume Flared 0Measured Safety Pilot 0Continuous Assist 0TOTAL FLARED 0
Hilcorp Energy Company ALASKACONSERVATION ORDER NO. 219PRUDHOE BAY, COMBINED NIAKUKLISBURNE PRODUCTION CENTERGAS FLARING INCIDENTSJan-23VOLUME PLANNEDDATE TIME (Mscf) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSETotal Flare <= 1 Hour01/28/20231211-0350 1LP Flare: 1800 compressor shutdown because of control/instrumentation failure associated with new UPS system. Flared off the suction scrubbers of STV and IP through both relief valves, maintain safe pressure coming from plant while troubleshooting and getting turbine compressors fired back up.UCompleted troubleshooting, reloaded 1801 STV/IP Compressor, and stabilized facility process and operation.1/28/20231211-0145 19HP Flare: 1807 and 1808 Reinjection compressors shutdown because of control/instrumentation failure associated with new UPS system. Flared off the HP separator through both relief valves, maintain safe pressure coming into plant while troubleshooting and getting turbine compressors fired back up.UCompleted troubleshooting, reloaded 1807 and 1808 T/C, and stabilized facility process and operation.Total Flare > 1 Hour20Volume Flared 20Measured Safety Pilot 47Continuous Assist 399TOTAL FLARED 466
Hilcorp Energy Company ALASKACONSERVATION ORDER NO. 219PRUDHOE BAY, RAVENLISBURNE PRODUCTION CENTERGAS FLARING INCIDENTSJan-23VOLUME PLANNEDDATE TIME (Mscf) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSETotal Flare <= 1 Hour01/28/20231211-0350 23LP Flare: 1800 compressor shutdown because of control/instrumentation failure associated with new UPS system. Flared off the suction scrubbers of STV and IP through both relief valves, maintain safe pressure coming from plant while troubleshooting and getting turbine compressors fired back up.UCompleted troubleshooting, reloaded 1801 STV/IP Compressor, and stabilized facility process and operation.1/28/20231211-0145 305HP Flare: 1807 and 1808 Reinjection compressors shutdown because of control/instrumentation failure associated with new UPS system. Flared off the HP separator through both relief valves, maintain safe pressure coming into plant while troubleshooting and getting turbine compressors fired back up.UCompleted troubleshooting, reloaded 1807 and 1808 T/C, and stabilized facility process and operation.Total Flare > 1 Hour328Volume Flared 328Measured Safety Pilot 781Continuous Assist 6,569TOTAL FLARED 7,678
2. Facility NamePBU LISBURNE PROD (GPMA)Percent5.7%0.6%0.0%0.4%0.0%0.0%0.0%29.1%64.3%19. Remarks:Pt McIntyre NGLs at CGF gas equivalent = 19,906; Pt McIntyre LPC Rich Gas NGLs at CGF gas equivalent =67 andLisburne LPC Rich Gas NGLs at CGF gas equivalent = 149;Block 18: LPC Rich Gas to CGF = 15,340Form 10-422 Revised 10/2021Reviewed by:COMMISSIONERTitle: Production Analyst713-289-2981Comm.Comm.17. Transferred from:2,505,94618. Transferred to: (Express as a negative #)-15,340I hereby certify that the foregoing is true and correct to the best of my knowledge. Revision? Date of Revision: Authorized Name and Digital Signature with Date:Contact Phone:Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60° F. Authority 20 AAC 25.235.Contact Email:sdenton@hilcorp.comBlock 13: Lift Gas Off Field; Block 17: MI from Prudhoe = 2,505,946 and Fuel Gas from Prudhoe = 0,MCFAuthorization >1 hr:Conservation:MCF15. NGL Gas Equivalent120,302MCF16. Purchased gas0Waste:Prudhoe Bay, Lisburne Oil64014412. Fuel gas used in lease operations.866,567AOGCC Use Only13. Other (see instructions)2,736,298MCFSafety:Lease Use:14. TOTAL VOLUME (ITEMS 6-13)12,069,82911. Assist Gas84,14010. Pilot and Purge11,114Prudhoe Bay, N Prudhoe Bay 640152Prudhoe Bay, Pt Mcintyre Oil6401809. Flared or vented more than 1 hour (see instr.)1,108Prudhoe Bay, Prudhoe Oil640150Prudhoe Bay, W Beach Oil640186Prudhoe Bay, Sag Riv Undef 6401658. Flared or vented 1 hour or less44Prudhoe Bay, W Bch Tr Un 640187Prudhoe Bay, Niakuk Oil6401480290000009PBU - GPMAHilcorpFebruary-2023DispositionVolume MCF20.For production from multiple pools, list contribution of each pool as a percent ofTotal Volume.6. Sold120,302Pool NamePool Code7. Reinjected8,250,256Prudhoe Bay, Raven Oil640147STATE OF ALASKAALASKA OIL AND GAS CONSERVATION COMMISSIONFACILITY REPORT OF PRODUCED GAS DISPOSITION1. Facility Number3. Field4. Operator5. Month/Year of DispositionForm 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in DuplicateDigitally signed by Sheila Denton(2293)DN: cn=Sheila Denton (2293),ou=UsersDate: 2023.03.17 04:56:31 -08'00'Sheila Denton(2293):&%*&:JLC 12/7/2023Brett W. Huber, Sr.Digitally signed by Brett W. Huber, Sr. Date: 2023.12.11 11:51:01 -09'00'
Hilcorp Energy Company ALASKACONSERVATION ORDER NO. 219PRUDHOE BAY, PRUDHOELISBURNE PRODUCTION CENTERGAS FLARING INCIDENTSFeb-23VOLUMEPLANNEDDATETIME(Mscf)DESCRIPTION OF INCIDENTS & CAUSEUNPLANNEDACTION TAKEN TO ELIMINATE CAUSE2/24/20231108-11090P2/25/20230436-04460U2/25/20230350-04060U2/27/20230111-01130U2/27/2023 0410-04130U2/27/20230520-05220U2/28/20231044-10460UTotal Flare <= 1 Hour002/10/23 0820-0744 0LP FLARE: UPS Upgrade malfunction. Lost power to entire plant and shut in all drill sites. All valves failed to their safe position and caused an intermittent flaring event through STV flareURate was automatically cut due to the drill sites being shut in. Restarted all equipment at LPC/GPMA. Started STV/IP to stop this flaring event02/10/23 0820-0400 0HP Flare: UPS Upgrade malfunction. Lost power to entire plant and shut in all drill sites. All valves failed to their safe position and caused an intermittent flaring eventURate was automatically cut due to the drill sites being shut in. Restarted all equipment at LPC/GPMATotal Flare > 1 Hour0Volume Flared0Measured Safety Pilot0Continuous Assist0TOTAL FLARED0
Hilcorp Energy Company ALASKACONSERVATION ORDER NO. 219PRUDHOE BAY, LISBURNELISBURNE PRODUCTION CENTERGAS FLARING INCIDENTSFeb-23VOLUMEPLANNEDDATETIME(MSCF)DESCRIPTION OF INCIDENTS & CAUSEUNPLANNEDACTION TAKEN TO ELIMINATE CAUSE2/24/20231108-11092P2/25/20230436-04466U2/25/20230350-04066U2/27/20230111-01133U2/27/2023 0410-04133U2/27/20230520-05222U2/28/20231044-10463UTotal Flare <= 1 Hour252/10/2023 0820-0744 6LP FLARE: UPS Upgrade malfunction. Lost power to entire plant and shut in all drill sites. All valves failed to their safe position and caused an intermittent flaring event through STV flareURate was automatically cut due to the drill sites being shut in. Restarted all equipment at LPC/GPMA. Started STV/IP to stop this flaring event2/10/2023 0820-0400 641HP Flare: UPS Upgrade malfunction. Lost power to entire plant and shut in all drill sites. All valves failed to their safe position and caused an intermittent flaring eventURate was automatically cut due to the drill sites being shut in. Restarted all equipment at LPC/GPMATotal Flare > 1 Hour647Volume Flared672Measured Safety Pilot7,130Continuous Assist54,023TOTAL FLARED61,825
Hilcorp Energy Company ALASKACONSERVATION ORDER NO. 219PRUDHOE BAY, POINT MCINTYRELISBURNE PRODUCTION CENTERGAS FLARING INCIDENTSFeb-23VOLUMEPLANNEDDATETIME(MSCF)DESCRIPTION OF INCIDENTS & CAUSEUNPLANNEDACTION TAKEN TO ELIMINATE CAUSE2/24/20231108-11092P2/25/20230436-04464U2/25/20230350-04064U2/27/20230111-01131U2/27/2023 0410-04132U2/27/20230520-05222U2/28/20231044-10462UTotal Flare <= 1 Hour172/10/2023 0820-0744 3LP FLARE: UPS Upgrade malfunction. Lost power to entire plant and shut in all drill sites. All valves failed to their safe position and caused an intermittent flaring event through STV flareURate was automatically cut due to the drill sites being shut in. Restarted all equipment at LPC/GPMA. Started STV/IP to stop this flaring event2/10/2023 0820-0400 400HP Flare: UPS Upgrade malfunction. Lost power to entire plant and shut in all drill sites. All valves failed to their safe position and caused an intermittent flaring eventURate was automatically cut due to the drill sites being shut in. Restarted all equipment at LPC/GPMATotal Flare > 1 Hour403Volume Flared420Measured Safety Pilot3,248Continuous Assist24,480TOTAL FLARED28,148
Hilcorp Energy Company ALASKACONSERVATION ORDER NO. 219PRUDHOE BAY, WEST BEACHLISBURNE PRODUCTION CENTERGAS FLARING INCIDENTSFeb-23VOLUMEPLANNEDDATETIME(MSCF)DESCRIPTION OF INCIDENTS & CAUSEUNPLANNEDACTION TAKEN TO ELIMINATE CAUSE2/24/20231108-11090P2/25/20230436-04460U2/25/20230350-04060U2/27/20230111-01130U2/27/2023 0410-04130U2/27/20230520-05220U2/28/20231044-10460UTotal Flare <= 1 Hour002/10/23 0820-0744 0LP FLARE: UPS Upgrade malfunction. Lost power to entire plant and shut in all drill sites. All valves failed to their safe position and caused an intermittent flaring event through STV flareURate was automatically cut due to the drill sites being shut in. Restarted all equipment at LPC/GPMA. Started STV/IP to stop this flaring event02/10/23 0820-0400 0HP Flare: UPS Upgrade malfunction. Lost power to entire plant and shut in all drill sites. All valves failed to their safe position and caused an intermittent flaring eventURate was automatically cut due to the drill sites being shut in. Restarted all equipment at LPC/GPMATotal Flare > 1 Hour0Volume Flared0Measured Safety Pilot0Continuous Assist0TOTAL FLARED0
Hilcorp Energy Company ALASKACONSERVATION ORDER NO. 219PRUDHOE BAY, NORTH PRUDHOE BAYLISBURNE PRODUCTION CENTERGAS FLARING INCIDENTSFeb-23VOLUMEPLANNEDDATETIME(MSCF)DESCRIPTION OF INCIDENTS & CAUSEUNPLANNEDACTION TAKEN TO ELIMINATE CAUSE2/24/20231108-11090P2/25/20230436-04460U2/25/20230350-04060U2/27/20230111-01130U2/27/2023 0410-04130U2/27/20230520-05220U2/28/20231044-10460UTotal Flare <= 1 Hour002/10/23 0820-0744 0LP FLARE: UPS Upgrade malfunction. Lost power to entire plant and shut in all drill sites. All valves failed to their safe position and caused an intermittent flaring event through STV flareURate was automatically cut due to the drill sites being shut in. Restarted all equipment at LPC/GPMA. Started STV/IP to stop this flaring event02/10/23 0820-0400 0HP Flare: UPS Upgrade malfunction. Lost power to entire plant and shut in all drill sites. All valves failed to their safe position and caused an intermittent flaring eventURate was automatically cut due to the drill sites being shut in. Restarted all equipment at LPC/GPMATotal Flare > 1 Hour0Volume Flared0Measured Safety Pilot0Continuous Assist0TOTAL FLARED0
Hilcorp Energy Company ALASKACONSERVATION ORDER NO. 219PRUDHOE BAY, COMBINED NIAKUKLISBURNE PRODUCTION CENTERGAS FLARING INCIDENTSFeb-23VOLUMEPLANNEDDATETIME(Mscf)DESCRIPTION OF INCIDENTS & CAUSEUNPLANNEDACTION TAKEN TO ELIMINATE CAUSE2/24/20231108-11090P2/25/20230436-04460U2/25/20230350-04060U2/27/20230111-01130U2/27/2023 0410-04130U2/27/20230520-05220U2/28/20231044-10460UTotal Flare <= 1 Hour002/10/23 0820-0744 0LP FLARE: UPS Upgrade malfunction. Lost power to entire plant and shut in all drill sites. All valves failed to their safe position and caused an intermittent flaring event through STV flareURate was automatically cut due to the drill sites being shut in. Restarted all equipment at LPC/GPMA. Started STV/IP to stop this flaring event02/10/23 0820-0400 2HP Flare: UPS Upgrade malfunction. Lost power to entire plant and shut in all drill sites. All valves failed to their safe position and caused an intermittent flaring eventURate was automatically cut due to the drill sites being shut in. Restarted all equipment at LPC/GPMATotal Flare > 1 Hour2Volume Flared2Measured Safety Pilot41Continuous Assist321TOTAL FLARED364
Hilcorp Energy Company ALASKACONSERVATION ORDER NO. 219PRUDHOE BAY, RAVENLISBURNE PRODUCTION CENTERGAS FLARING INCIDENTSFeb-23VOLUMEPLANNEDDATETIME(Mscf)DESCRIPTION OF INCIDENTS & CAUSEUNPLANNEDACTION TAKEN TO ELIMINATE CAUSE2/24/20231108-11090P2/25/20230436-04461U2/25/20230350-04060U2/27/20230111-01131U2/27/2023 0410-04130U2/27/20230520-05220U2/28/20231044-10460UTotal Flare <= 1 Hour202/10/23 0820-0744 1LP FLARE: UPS Upgrade malfunction. Lost power to entire plant and shut in all drill sites. All valves failed to their safe position and caused an intermittent flaring event through STV flareURate was automatically cut due to the drill sites being shut in. Restarted all equipment at LPC/GPMA. Started STV/IP to stop this flaring event02/10/23 0820-0400 55HP Flare: UPS Upgrade malfunction. Lost power to entire plant and shut in all drill sites. All valves failed to their safe position and caused an intermittent flaring eventURate was automatically cut due to the drill sites being shut in. Restarted all equipment at LPC/GPMATotal Flare > 1 Hour56Volume Flared58Measured Safety Pilot695Continuous Assist5,316TOTAL FLARED6,069
2. Facility Name
PBU LISBURNE PROD (GPMA)
Percent
5.4%
0.5%
0.0%
0.3%
7.4%
0.0%
0.0%
26.4%
60.0%
19. Remarks:
Pt McIntyre NGLs at CGF gas equivalent = 25,191; Pt McIntyre LPC Rich Gas NGLs at CGF gas equivalent = 4,067 and
Lisburne LPC Rich Gas NGLs at CGF gas equivalent = 9,230;
Block 18: LPC Rich Gas to CGF = 1,735,658
Form 10-422 Revised 10/2021
Reviewed by:
COMMISSIONER
Title: Production Analyst
713-289-2981
Comm.Comm.
Block 13: Lift Gas Off Field; Block 17: MI from Prudhoe = 2,914,886 and Fuel Gas from Prudhoe = 0,
17. Transferred from:2,914,886
18. Transferred to: (Express as a negative #)-1,735,658
I hereby certify that the foregoing is true and correct to the best of my knowledge. Revision? Date of Revision:
Authorized Name and Digital Signature with Date:
Contact Phone:Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60° F. Authority 20 AAC 25.235.Contact Email:sdenton@hilcorp.com
MCFAuthorization >1 hr:
Conservation:MCF
15. NGL Gas Equivalent 158,207
MCF
16. Purchased gas 0
Waste:
Prudhoe Bay, Lisburne Oil 640144
12. Fuel gas used in lease operations.991,033 AOGCC Use Only
13. Other (see instructions)2,872,656
MCF
Safety:
Lease Use:
14. TOTAL VOLUME (ITEMS 6-13)13,264,714
11. Assist Gas 119,000
10. Pilot and Purge 12,306 Prudhoe Bay, N Prudhoe Bay 640152
Prudhoe Bay, Pt Mcintyre Oil 640180
9. Flared or vented more than 1 hour (see instr.)0 Prudhoe Bay, Prudhoe Oil 640150
Prudhoe Bay, W Beach Oil 640186
Prudhoe Bay, Sag Riv Undef 640165
8. Flared or vented 1 hour or less 11 Prudhoe Bay, W Bch Tr Un 640187
Prudhoe Bay, Niakuk Oil 640148
0290000009 PBU - GPMA Hilcorp March-2023
Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold 158,207 Pool Name Pool Code
7. Reinjected 9,111,501 Prudhoe Bay, Raven Oil 640147
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number 3. Field 4. Operator 5. Month/Year of Disposition
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
Hilcorp Energy Company ALASKA
CONSERVATION ORDER NO. 219
PRUDHOE BAY, PRUDHOE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Mar-23
VOLUME PLANNED
DATE TIME (Mscf)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
3/1/2023 0314-0315 0 P
3/6/2023 0655-0658 0 P
3/12/2023 0909-0910 0 U
Total Flare <= 1 Hour 0
Total Flare > 1 Hour 0
Volume Flared 0
Measured Safety Pilot 907
Continuous Assist 8,780
TOTAL FLARED 9,687
Hilcorp Energy Company ALASKA
CONSERVATION ORDER NO. 219
PRUDHOE BAY, LISBURNE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Mar-23
VOLUME PLANNED
DATE TIME (MSCF)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
3/1/2023 0314-0315 1 P
3/6/2023 0655-0658 2 P
3/12/2023 0909-0910 4 U
Total Flare <= 1 Hour 7
Total Flare > 1 Hour 0
Volume Flared 7
Measured Safety Pilot 7,385
Continuous Assist 71,383
TOTAL FLARED 78,775
Hilcorp Energy Company ALASKA
CONSERVATION ORDER NO. 219
PRUDHOE BAY, POINT MCINTYRE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Mar-23
VOLUME PLANNED
DATE TIME (MSCF)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
3/1/2023 0314-0315 0 P
3/6/2023 0655-0658 2 P
3/12/2023 0909-0910 2 U
Total Flare <= 1 Hour 4
Total Flare > 1 Hour 0
Volume Flared 4
Measured Safety Pilot 3,252
Continuous Assist 31,477
TOTAL FLARED 34,733
Hilcorp Energy Company ALASKA
CONSERVATION ORDER NO. 219
PRUDHOE BAY, WEST BEACH
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Mar-23
VOLUME PLANNED
DATE TIME (MSCF)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
3/1/2023 0314-0315 0 P
3/6/2023 0655-0658 0 P
3/12/2023 0909-0910 0 U
Total Flare <= 1 Hour 0
Total Flare > 1 Hour 0
Volume Flared 0
Measured Safety Pilot 0
Continuous Assist 0
TOTAL FLARED 0
Hilcorp Energy Company ALASKA
CONSERVATION ORDER NO. 219
PRUDHOE BAY, NORTH PRUDHOE BAY
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Mar-23
VOLUME PLANNED
DATE TIME (MSCF)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
3/1/2023 0314-0315 0 P
3/6/2023 0655-0658 0 P
3/12/2023 0909-0910 0 U
Total Flare <= 1 Hour 0
Total Flare > 1 Hour 0
Volume Flared 0
Measured Safety Pilot 0
Continuous Assist 0
TOTAL FLARED 0
Hilcorp Energy Company ALASKA
CONSERVATION ORDER NO. 219
PRUDHOE BAY, COMBINED NIAKUK
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Mar-23
VOLUME PLANNED
DATE TIME (Mscf)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
3/1/2023 0314-0315 0 P
3/6/2023 0655-0658 0 P
3/12/2023 0909-0910 0 U
Total Flare <= 1 Hour 0
Total Flare > 1 Hour 0
Volume Flared 0
Measured Safety Pilot 41
Continuous Assist 391
TOTAL FLARED 432
Hilcorp Energy Company ALASKA
CONSERVATION ORDER NO. 219
PRUDHOE BAY, RAVEN
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Mar-23
VOLUME PLANNED
DATE TIME (Mscf)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
3/1/2023 0314-0315 0 P
3/6/2023 0655-0658 0 P
3/12/2023 0909-0910 0 U
Total Flare <= 1 Hour 0
Total Flare > 1 Hour 0
Volume Flared 0
Measured Safety Pilot 721
Continuous Assist 6,969
TOTAL FLARED 7,690
2. Facility Name
PBU LISBURNE PROD (GPMA)
Percent
4.2%
0.5%
0.0%
0.3%
7.6%
0.0%
0.0%
25.7%
61.7%
19. Remarks:
Pt McIntyre NGLs at CGF gas equivalent = 23,873; Pt McIntyre LPC Rich Gas NGLs at CGF gas equivalent = 4,031 and
Lisburne LPC Rich Gas NGLs at CGF gas equivalent = 9,685;
Block 18: LPC Rich Gas to CGF = 1,777,236
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number 3. Field 4. Operator 5. Month/Year of Disposition
0290000009 PBU - GPMA Hilcorp April-2023
Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold 156,701 Pool Name Pool Code
7. Reinjected 8,337,153 Prudhoe Bay, Raven Oil 640147
Prudhoe Bay, Sag Riv Undef 640165
8. Flared or vented 1 hour or less 542 Prudhoe Bay, W Bch Tr Un 640187
Prudhoe Bay, Niakuk Oil 640148
9. Flared or vented more than 1 hour (see instr.)0 Prudhoe Bay, Prudhoe Oil 640150
Prudhoe Bay, W Beach Oil 640186
10. Pilot and Purge 11,911 Prudhoe Bay, N Prudhoe Bay 640152
Prudhoe Bay, Pt Mcintyre Oil 640180
Prudhoe Bay, Lisburne Oil 640144
12. Fuel gas used in lease operations.966,876 AOGCC Use Only
13. Other (see instructions)2,893,247
MCF
Safety:
Lease Use:
14. TOTAL VOLUME (ITEMS 6-13)12,479,133
11. Assist Gas 112,703
MCFAuthorization >1 hr:
Conservation:MCF
15. NGL Gas Equivalent 156,701
MCF
16. Purchased gas 0
Waste:
Contact Phone:Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60° F. Authority 20 AAC 25.235.Contact Email:sdenton@hilcorp.com
Form 10-422 Revised 10/2021
Reviewed by:
COMMISSIONER
Title: Production Analyst
713-289-2981
Comm.Comm.
Block 13: Lift Gas Off Field; Block 17: MI from Prudhoe = 2,374,361 and Fuel Gas from Prudhoe = 0,
17. Transferred from:2,374,361
18. Transferred to: (Express as a negative #)-1,777,236
I hereby certify that the foregoing is true and correct to the best of my knowledge. Revision? Date of Revision:
Authorized Name and Digital Signature with Date:
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
Hilcorp Energy Company ALASKA
CONSERVATION ORDER NO. 219
PRUDHOE BAY, PRUDHOE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Apr-23
VOLUME PLANNED
DATE TIME (Mscf)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
4/4/2023 0101-0102 39 U
Total Flare <= 1 Hour 39
Total Flare > 1 Hour 0
Volume Flared 39
Measured Safety Pilot 908
Continuous Assist 8,594
TOTAL FLARED 9,541
Hilcorp Energy Company ALASKA
CONSERVATION ORDER NO. 219
PRUDHOE BAY, LISBURNE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Apr-23
VOLUME PLANNED
DATE TIME (MSCF)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
4/4/2023 0101-0102 325 U
Total Flare <= 1 Hour 325
Total Flare > 1 Hour 0
Volume Flared 325
Measured Safety Pilot 7,353
Continuous Assist 69,579
TOTAL FLARED 77,257
Hilcorp Energy Company ALASKA
CONSERVATION ORDER NO. 219
PRUDHOE BAY, POINT MCINTYRE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Apr-23
VOLUME PLANNED
DATE TIME (MSCF)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
4/4/2023 0101-0102 143 U
Total Flare <= 1 Hour 143
Total Flare > 1 Hour 0
Volume Flared 143
Measured Safety Pilot 3,060
Continuous Assist 28,952
TOTAL FLARED 32,155
Hilcorp Energy Company ALASKA
CONSERVATION ORDER NO. 219
PRUDHOE BAY, WEST BEACH
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Apr-23
VOLUME PLANNED
DATE TIME (MSCF)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
4/4/2023 0101-0102 0 U
Total Flare <= 1 Hour 0
Total Flare > 1 Hour 0
Volume Flared 0
Measured Safety Pilot 0
Continuous Assist 0
TOTAL FLARED 0
Hilcorp Energy Company ALASKA
CONSERVATION ORDER NO. 219
PRUDHOE BAY, NORTH PRUDHOE BAY
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Apr-23
VOLUME PLANNED
DATE TIME (MSCF)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
4/4/2023 0101-0102 0 U
Total Flare <= 1 Hour 0
Total Flare > 1 Hour 0
Volume Flared 0
Measured Safety Pilot 0
Continuous Assist 0
TOTAL FLARED 0
Hilcorp Energy Company ALASKA
CONSERVATION ORDER NO. 219
PRUDHOE BAY, COMBINED NIAKUK
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Apr-23
VOLUME PLANNED
DATE TIME (Mscf)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
4/4/2023 0101-0102 2 U
Total Flare <= 1 Hour 2
Total Flare > 1 Hour 0
Volume Flared 2
Measured Safety Pilot 39
Continuous Assist 370
TOTAL FLARED 411
Hilcorp Energy Company ALASKA
CONSERVATION ORDER NO. 219
PRUDHOE BAY, RAVEN
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Apr-23
VOLUME PLANNED
DATE TIME (Mscf)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
4/4/2023 0101-0102 33 U
Total Flare <= 1 Hour 33
Total Flare > 1 Hour 0
Volume Flared 33
Measured Safety Pilot 551
Continuous Assist 5,208
TOTAL FLARED 5,792
2. Facility Name
PBU LISBURNE PROD (GPMA)
Percent
4.8%
0.4%
0.0%
0.3%
9.3%
0.0%
0.0%
26.6%
58.6%
19. Remarks:
Pt McIntyre NGLs at CGF gas equivalent = 28,225; Pt McIntyre LPC Rich Gas NGLs at CGF gas equivalent = 4,405 and
Lisburne LPC Rich Gas NGLs at CGF gas equivalent = 9,814;
Block 18: LPC Rich Gas to CGF = 1,840,478
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number 3. Field 4. Operator 5. Month/Year of Disposition
0290000009 PBU - GPMA Hilcorp May-2023
Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold 159,089 Pool Name Pool Code
7. Reinjected 8,049,504 Prudhoe Bay, Raven Oil 640147
Prudhoe Bay, Sag Riv Undef 640165
8. Flared or vented 1 hour or less 91 Prudhoe Bay, W Bch Tr Un 640187
Prudhoe Bay, Niakuk Oil 640148
9. Flared or vented more than 1 hour (see instr.)0 Prudhoe Bay, Prudhoe Oil 640150
Prudhoe Bay, W Beach Oil 640186
10. Pilot and Purge 12,224 Prudhoe Bay, N Prudhoe Bay 640152
Prudhoe Bay, Pt Mcintyre Oil 640180
Prudhoe Bay, Lisburne Oil 640144
12. Fuel gas used in lease operations.950,413 AOGCC Use Only
13. Other (see instructions)3,151,030
MCF
Safety:
Lease Use:
14. TOTAL VOLUME (ITEMS 6-13)12,435,705
11. Assist Gas 113,354
MCFAuthorization >1 hr:
Conservation:MCF
15. NGL Gas Equivalent 159,089
MCF
16. Purchased gas 0
Waste:
Contact Phone:Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60° F. Authority 20 AAC 25.235.Contact Email:sdenton@hilcorp.com
Form 10-422 Revised 10/2021
Reviewed by:
COMMISSIONER
Title: Production Analyst
713-289-2981
Comm.Comm.
Block 13: Lift Gas Off Field; Block 17: MI from Prudhoe = 2,778,881 and Fuel Gas from Prudhoe = 0,
17. Transferred from:2,778,881
18. Transferred to: (Express as a negative #)-1,840,478
I hereby certify that the foregoing is true and correct to the best of my knowledge. Revision? Date of Revision:
Authorized Name and Digital Signature with Date:
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
Hilcorp Energy Company ALASKA
CONSERVATION ORDER NO. 219
PRUDHOE BAY, PRUDHOE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
May-23
VOLUME PLANNED
DATE TIME (Mscf)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
5/14/2023 0824-0826 0 P
Total Flare <= 1 Hour 0
Total Flare > 1 Hour 0
Volume Flared 0
Measured Safety Pilot 1,128
Continuous Assist 10,445
TOTAL FLARED 11,573
Hilcorp Energy Company ALASKA
CONSERVATION ORDER NO. 219
PRUDHOE BAY, LISBURNE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
May-23
VOLUME PLANNED
DATE TIME (MSCF)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
5/14/2023 0824-0826 45 P
Total Flare <= 1 Hour 45
Total Flare > 1 Hour 0
Volume Flared 45
Measured Safety Pilot 7,157
Continuous Assist 66,448
TOTAL FLARED 73,650
Hilcorp Energy Company ALASKA
CONSERVATION ORDER NO. 219
PRUDHOE BAY, POINT MCINTYRE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
May-23
VOLUME PLANNED
DATE TIME (MSCF)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
5/14/2023 0824-0826 41 P
Total Flare <= 1 Hour 41
Total Flare > 1 Hour 0
Volume Flared 41
Measured Safety Pilot 3,270
Continuous Assist 30,274
TOTAL FLARED 33,585
Hilcorp Energy Company ALASKA
CONSERVATION ORDER NO. 219
PRUDHOE BAY, WEST BEACH
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
May-23
VOLUME PLANNED
DATE TIME (MSCF)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
5/14/2023 0824-0826 0 P
Total Flare <= 1 Hour 0
Total Flare > 1 Hour 0
Volume Flared 0
Measured Safety Pilot 0
Continuous Assist 0
TOTAL FLARED 0
Hilcorp Energy Company ALASKA
CONSERVATION ORDER NO. 219
PRUDHOE BAY, NORTH PRUDHOE BAY
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
May-23
VOLUME PLANNED
DATE TIME (MSCF)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
5/14/2023 0824-0826 0 P
Total Flare <= 1 Hour 0
Total Flare > 1 Hour 0
Volume Flared 0
Measured Safety Pilot 0
Continuous Assist 0
TOTAL FLARED 0
Hilcorp Energy Company ALASKA
CONSERVATION ORDER NO. 219
PRUDHOE BAY, COMBINED NIAKUK
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
May-23
VOLUME PLANNED
DATE TIME (Mscf)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
5/14/2023 0824-0826 0 P
Total Flare <= 1 Hour 0
Total Flare > 1 Hour 0
Volume Flared 0
Measured Safety Pilot 31
Continuous Assist 284
TOTAL FLARED 315
Hilcorp Energy Company ALASKA
CONSERVATION ORDER NO. 219
PRUDHOE BAY, RAVEN
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
May-23
VOLUME PLANNED
DATE TIME (Mscf)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
5/14/2023 0824-0826 5 P
Total Flare <= 1 Hour 5
Total Flare > 1 Hour 0
Volume Flared 5
Measured Safety Pilot 638
Continuous Assist 5,903
TOTAL FLARED 6,546
2. Facility NamePBU LISBURNE PROD (GPMA)Percent3.7%0.4%0.0%0.3%11.1%0.0%0.0%24.7%59.8%19. Remarks:Pt McIntyre NGLs at CGF gas equivalent = 20,250; Pt McIntyre LPC Rich Gas NGLs at CGF gas equivalent = 3,010 andLisburne LPC Rich Gas NGLs at CGF gas equivalent = 7,078;Block 18: LPC Rich Gas to CGF = 1,374,979STATE OF ALASKAALASKA OIL AND GAS CONSERVATION COMMISSIONFACILITY REPORT OF PRODUCED GAS DISPOSITION1. Facility Number3. Field4. Operator5. Month/Year of Disposition0290000009PBU - GPMAHilcorpJune-2023DispositionVolume MCF20.For production from multiple pools, list contribution of each pool as a percent ofTotal Volume.6. Sold109,710Pool NamePool Code7. Reinjected6,010,076Prudhoe Bay, Raven Oil640147Prudhoe Bay, Sag Riv Undef 6401658. Flared or vented 1 hour or less224Prudhoe Bay, W Bch Tr Un 640187Prudhoe Bay, Niakuk Oil6401489. Flared or vented more than 1 hour (see instr.)5,457Prudhoe Bay, Prudhoe Oil640150Prudhoe Bay, W Beach Oil64018610. Pilot and Purge10,394Prudhoe Bay, N Prudhoe Bay 640152Prudhoe Bay, Pt Mcintyre Oil640180Prudhoe Bay, Lisburne Oil64014412. Fuel gas used in lease operations.756,375AOGCC Use Only13. Other (see instructions)2,543,699MCFSafety:Lease Use:14. TOTAL VOLUME (ITEMS 6-13)9,520,16111. Assist Gas84,226MCFAuthorization >1 hr:Conservation:MCF15. NGL Gas Equivalent109,710MCF16. Purchased gas0Waste:Contact Phone:Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60° F. Authority 20 AAC 25.235.Contact Email:Richard.Everett@hilcorp.comForm 10-422 Revised 10/2021Reviewed by:COMMISSIONERTitle: Senior Accounting Advisor713-757-7133Comm.Comm.Block 13: Lift Gas Off Field; Block 17: MI from Prudhoe = 1,666,475 and Fuel Gas from Prudhoe = 017. Transferred from:1,666,47518. Transferred to: (Express as a negative #)-1,374,979I hereby certify that the foregoing is true and correct to the best of my knowledge. Revision? Date of Revision: Authorized Name and Digital Signature with Date:Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in DuplicateDigitally signed by Richard Everett (006020)DN: cn=Richard Everett (006020)Date: 2023.07.20 08:05:49 -08'00'Richard Everett (006020):&%*&:JLC 12/7/2023Brett W. Huber, Sr.Digitally signed by Brett W. Huber, Sr. Date: 2023.12.11 12:18:10 -09'00'
Hilcorp Energy Company ALASKACONSERVATION ORDER NO. 219PRUDHOE BAY, PRUDHOELISBURNE PRODUCTION CENTERGAS FLARING INCIDENTSJun-23VOLUME PLANNEDDATE TIME (Mscf) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE6/1/2023 1840-184211P6/2/2023 0000-00010P6/2/2023 0037-00390P6/2/2023 0718-07190P6/5/2023 1501-15080P6/30/2023 2007-20082UTotal Flare <= 1 Hour1306/02/23 1500-16400Depressured piping for Plant Maintenance P Depressurization complete.06/12/23 1749-1915 724Control/Instrumentation Failure (Lube Oil Temperature Switch) UReinjection compressor shutdown; Returned to operationTotal Flare > 1 Hour724Volume Flared 737Measured Safety Pilot 1,091Continuous Assist 8,332TOTAL FLARED 10,160
Hilcorp Energy Company ALASKACONSERVATION ORDER NO. 219PRUDHOE BAY, LISBURNELISBURNE PRODUCTION CENTERGAS FLARING INCIDENTSJun-23VOLUME PLANNEDDATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE6/1/2023 1840-184253P6/2/2023 0000-00010P6/2/2023 0037-003928P6/2/2023 0718-07191P6/5/2023 1501-150813P6/30/2023 2007-20087UTotal Flare <= 1 Hour1026/2/2023 1500-16400Depressured piping for Plant Maintenance P Depressurization complete.6/12/20231749-1915 3,335Control/Instrumentation Failure (Lube Oil Temperature Switch) UReinjection compressor shutdown; Returned to operationTotal Flare > 1 Hour3,335Volume Flared 3,437Measured Safety Pilot 6,076Continuous Assist 48,347TOTAL FLARED 57,860
Hilcorp Energy Company ALASKACONSERVATION ORDER NO. 219PRUDHOE BAY, POINT MCINTYRELISBURNE PRODUCTION CENTERGAS FLARING INCIDENTSJun-23VOLUME PLANNEDDATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE6/1/2023 1840-184226P6/2/2023 0000-00011P6/2/2023 0037-003952P6/2/2023 0718-07192P6/5/2023 1501-150821P6/30/2023 2007-20083UTotal Flare <= 1 Hour10506/02/23 1500-16401Depressured piping for Plant Maintenance P Depressurization complete.06/12/23 1749-1915 1,082Control/Instrumentation Failure (Lube Oil Temperature Switch)UReinjection compressor shutdown; Returned to operationTotal Flare > 1 Hour1,083Volume Flared 1,188Measured Safety Pilot 2,800Continuous Assist 24,163TOTAL FLARED 28,151
Hilcorp Energy Company ALASKACONSERVATION ORDER NO. 219PRUDHOE BAY, WEST BEACHLISBURNE PRODUCTION CENTERGAS FLARING INCIDENTSJun-23VOLUME PLANNEDDATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE6/1/2023 1840-18420P6/2/2023 0000-00010P6/2/2023 0037-00390P6/2/2023 0718-07190P6/5/2023 1501-15080P6/30/2023 2007-20080UTotal Flare <= 1 Hour006/02/23 1500-16400Depressured piping for Plant Maintenance P Depressurization complete.06/12/23 1749-1915 0Control/Instrumentation Failure (Lube Oil Temperature Switch)UReinjection compressor shutdown; Returned to operationTotal Flare > 1 Hour0Volume Flared 0Measured Safety Pilot 0Continuous Assist 0TOTAL FLARED 0
Hilcorp Energy Company ALASKACONSERVATION ORDER NO. 219PRUDHOE BAY, NORTH PRUDHOE BAYLISBURNE PRODUCTION CENTERGAS FLARING INCIDENTSJun-23VOLUME PLANNEDDATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE6/1/2023 1840-18420P6/2/2023 0000-00010P6/2/2023 0037-00390P6/2/2023 0718-07190P6/5/2023 1501-15080P6/30/2023 2007-20080UTotal Flare <= 1 Hour006/02/23 1500-16400Depressured piping for Plant Maintenance P Depressurization complete.06/12/23 1749-1915 0Control/Instrumentation Failure (Lube Oil Temperature Switch)UReinjection compressor shutdown; Returned to operationTotal Flare > 1 Hour0Volume Flared 0Measured Safety Pilot 0Continuous Assist 0TOTAL FLARED 0
Hilcorp Energy Company ALASKACONSERVATION ORDER NO. 219PRUDHOE BAY, COMBINED NIAKUKLISBURNE PRODUCTION CENTERGAS FLARING INCIDENTSJun-23VOLUME PLANNEDDATE TIME (Mscf) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE6/1/2023 1840-18420P6/2/2023 0000-00010P6/2/2023 0037-00390P6/2/2023 0718-07190P6/5/2023 1501-15080P6/30/2023 2007-20080UTotal Flare <= 1 Hour006/02/23 1500-16400Depressured piping for Plant Maintenance P Depressurization complete.06/12/23 1749-1915 16Control/Instrumentation Failure (Lube Oil Temperature Switch)UReinjection compressor shutdown; Returned to operationTotal Flare > 1 Hour16Volume Flared 16Measured Safety Pilot 26Continuous Assist 201TOTAL FLARED 243
Hilcorp Energy Company ALASKACONSERVATION ORDER NO. 219PRUDHOE BAY, RAVENLISBURNE PRODUCTION CENTERGAS FLARING INCIDENTSJun-23VOLUME PLANNEDDATE TIME (Mscf) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE6/1/2023 1840-18423P6/2/2023 0000-00010P6/2/2023 0037-00390P6/2/2023 0718-07190P6/5/2023 1501-15080P6/30/2023 2007-20081UTotal Flare <= 1 Hour406/02/23 1500-16400Depressured piping for Plant Maintenance P Depressurization complete.06/12/23 1749-1915 299Control/Instrumentation Failure (Lube Oil Temperature Switch)UReinjection compressor shutdown; Returned to operationTotal Flare > 1 Hour299Volume Flared 303Measured Safety Pilot 401Continuous Assist 3,183TOTAL FLARED 3,887
2. Facility NamePBU LISBURNE PROD (GPMA)Percent3.5%0.4%0.0%0.3%13.1%0.0%0.0%18.5%64.3%19. Remarks:Pt McIntyre NGLs at CGF gas equivalent = 17,065; Pt McIntyre LPC Rich Gas NGLs at CGF gas equivalent = 2,848 andLisburne LPC Rich Gas NGLs at CGF gas equivalent = 9,991;Block 18: LPC Rich Gas to CGF = 1,782,110STATE OF ALASKAALASKA OIL AND GAS CONSERVATION COMMISSIONFACILITY REPORT OF PRODUCED GAS DISPOSITION1. Facility Number3. Field4. Operator5. Month/Year of Disposition0290000009PBU - GPMAHilcorpJuly-2023DispositionVolume MCF20.For production from multiple pools, list contribution of each pool as a percent ofTotal Volume.6. Sold125,671Pool NamePool Code7. Reinjected6,975,538Prudhoe Bay, Raven Oil640147Prudhoe Bay, Sag Riv Undef 6401658. Flared or vented 1 hour or less0Prudhoe Bay, W Bch Tr Un 640187Prudhoe Bay, Niakuk Oil6401489. Flared or vented more than 1 hour (see instr.)24,536Prudhoe Bay, Prudhoe Oil640150Prudhoe Bay, W Beach Oil64018610. Pilot and Purge12,244Prudhoe Bay, N Prudhoe Bay 640152Prudhoe Bay, Pt Mcintyre Oil64018011. Assist Gas107,020Prudhoe Bay, Lisburne Oil640144MCF13. Other (see instructions)2,734,211Lease Use:MCF14. TOTAL VOLUME (ITEMS 6-13)10,889,875Conservation:12. Fuel gas used in lease operations.910,655AOGCC Use OnlyAuthorization >1 hr:Safety:MCF15. NGL Gas Equivalent125,671Waste:MCF16. Purchased gas0Reviewed by:17. Transferred from:1,226,358COMMISSIONER18. Transferred to: (Express as a negative #)-1,782,110Comm.Comm.Richard.Everett@hilcorp.comForm 10-422 Revised 10/2021Block 13: Lift Gas Off Field; Block 17: MI from Prudhoe = 1,226,358 and Fuel Gas from Prudhoe = 0I hereby certify that the foregoing is true and correct to the best of my knowledge. Revision? Date of Revision: Title: Senior Accounting AdvisorAuthorized Name and Digital Signature with Date:Contact Phone:713-757-7133Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60° F. Authority 20 AAC 25.235.Contact Email:Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in DuplicateDigitally signed by Richard Everett (006020)DN: cn=Richard Everett (006020)Date: 2023.08.15 12:48:53 -08'00'Richard Everett (006020):&%*&:JLC 12/7/2023Brett W. Huber, Sr.Digitally signed by Brett W. Huber, Sr. Date: 2023.12.11 12:28:13 -09'00'
RptDate OpNo FacilityNo Date Flared Start Time Ending Time End Date Planned MCF Description of Flaring Event Action Taken to Minimize Volume
07/01/2023 124260 0290000009 07/20/2023 08:57 10:31 07/20/2023 U 9703 1808 Reinjection compressor shutdown because of gasket leak on buffer air cooler. Completed trouble shooting and repair of air cooler gasket. Start attempted at 9:40; trouble with WHRU louvers. Started cutting gas rate at drill sites at 9:56. Rate fully cut and out of flare at 10:31. WHRU louvers fixed at 10:36 and reloaded 1808 T/C. Stabilizeed facility process and operation.
07/01/2023 124260 0290000009 07/21/2023 12:23 13:31 07/21/2023 U 8110 1807 Reinjection compressor shutdown because of high lube oil temperature. Completed trouble shooting. First start attempt failed on gear box vibration at 12:50. Second attempt started at 13:13; fully loaded at 1807 T/C; stabilized facility process and operation.
07/01/2023 124260 0290000009 07/21/2023 14:45 15:48 07/21/2023 U 6723 1807 Reinjection compressor shutdown because of high lube oil temperature. Completed trouble shooting; checked switch calibration. First start attempt at 15:11; failed at 15:11 with gear box vibration. Second attempt at 15:33, fully reloaded and stabilized facility process and operation.
2. Facility Name
PBU LISBURNE PROD (GPMA)
Percent
2.2%
0.4%
0.0%
0.2%
16.1%
0.0%
0.0%
20.4%
60.8%
19. Remarks:
Pt McIntyre NGLs at CGF gas equivalent = 11,601; Pt McIntyre LPC Rich Gas NGLs at CGF gas equivalent = 3,127 and
Lisburne LPC Rich Gas NGLs at CGF gas equivalent = 9,262;
Block 18: LPC Rich Gas to CGF = 1,790,020
Form 10-422 Revised 10/2021
Reviewed by:
COMMISSIONER
Title: Senior Accounting Advisor
713-757-7133
Comm.Comm.
Block 13: Lift Gas Off Field; Block 17: MI from Prudhoe = 1,279,638 and Fuel Gas from Prudhoe = 0
17. Transferred from:1,279,638
18. Transferred to: (Express as a negative #)-1,790,020
I hereby certify that the foregoing is true and correct to the best of my knowledge. Revision? Date of Revision:
Authorized Name and Digital Signature with Date:
Contact Phone:Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60° F. Authority 20 AAC 25.235.Contact Email:Richard.Everett@hilcorp.com
MCFAuthorization >1 hr:
Conservation:MCF
15. NGL Gas Equivalent 122,884
MCF
16. Purchased gas 0
Waste:
Prudhoe Bay, Lisburne Oil 640144
12. Fuel gas used in lease operations.912,185 AOGCC Use Only
13. Other (see instructions)2,534,205
MCF
Safety:
Lease Use:
14. TOTAL VOLUME (ITEMS 6-13)10,972,696
11. Assist Gas 119,649
10. Pilot and Purge 12,331 Prudhoe Bay, N Prudhoe Bay 640152
Prudhoe Bay, Pt Mcintyre Oil 640180
9. Flared or vented more than 1 hour (see instr.)0 Prudhoe Bay, Prudhoe Oil 640150
Prudhoe Bay, W Beach Oil 640186
Prudhoe Bay, Sag Riv Undef 640165
8. Flared or vented 1 hour or less 13 Prudhoe Bay, W Bch Tr Un 640187
Prudhoe Bay, Niakuk Oil 640148
0290000009 PBU - GPMA Hilcorp August-2023
Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold 122,884 Pool Name Pool Code
7. Reinjected 7,271,429 Prudhoe Bay, Raven Oil 640147
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number 3. Field 4. Operator 5. Month/Year of Disposition
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
2. Facility Name
PBU LISBURNE PROD (GPMA)
Percent
1.2%
0.3%
0.0%
0.2%
15.7%
0.0%
0.0%
22.2%
60.4%
19. Remarks:
Pt McIntyre NGLs at CGF gas equivalent = 23,375; Pt McIntyre LPC Rich Gas NGLs at CGF gas equivalent = 3,476 and
Lisburne LPC Rich Gas NGLs at CGF gas equivalent = 9,385;
Block 18: LPC Rich Gas to CGF = 1,764,957
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number 3. Field 4. Operator 5. Month/Year of Disposition
0290000009 PBU - GPMA Hilcorp September-2023
Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold 145,073 Pool Name Pool Code
7. Reinjected 8,276,379 Prudhoe Bay, Raven Oil 640147
Prudhoe Bay, Sag Riv Undef 640165
8. Flared or vented 1 hour or less 0 Prudhoe Bay, W Bch Tr Un 640187
Prudhoe Bay, Niakuk Oil 640148
9. Flared or vented more than 1 hour (see instr.)0 Prudhoe Bay, Prudhoe Oil 640150
Prudhoe Bay, W Beach Oil 640186
10. Pilot and Purge 12,007 Prudhoe Bay, N Prudhoe Bay 640152
Prudhoe Bay, Pt Mcintyre Oil 640180
Prudhoe Bay, Lisburne Oil 640144
12. Fuel gas used in lease operations.914,213 AOGCC Use Only
13. Other (see instructions)3,095,465
MCF
Safety:
Lease Use:
14. TOTAL VOLUME (ITEMS 6-13)12,552,670
11. Assist Gas 109,533
MCFAuthorization >1 hr:
Conservation:MCF
15. NGL Gas Equivalent 145,073
MCF
16. Purchased gas 0
Waste:
Contact Phone:Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60° F. Authority 20 AAC 25.235.Contact Email:Richard.Everett@hilcorp.com
Form 10-422 Revised 10/2021
Reviewed by:
COMMISSIONER
Title: Senior Accounting Advisor
713-757-7133
Comm.Comm.
Block 13: Lift Gas Off Field; Block 17: MI from Prudhoe = 1,983,378 and Fuel Gas from Prudhoe = 0
17. Transferred from:1,983,378
18. Transferred to: (Express as a negative #)-1,764,957
I hereby certify that the foregoing is true and correct to the best of my knowledge. Revision? Date of Revision:
Authorized Name and Digital Signature with Date:
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
Hilcorp Energy Company ALASKA
CONSERVATION ORDER NO. 219
PRUDHOE BAY, PRUDHOE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Sep-23
VOLUME PLANNED
DATE TIME (Mscf)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare <= 1 Hour 0
Total Flare > 1 Hour 0
Volume Flared 0
Measured Safety Pilot 1,885
Continuous Assist 17,198
TOTAL FLARED 19,083
Hilcorp Energy Company ALASKA
CONSERVATION ORDER NO. 219
PRUDHOE BAY, LISBURNE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Sep-23
VOLUME PLANNED
DATE TIME (MSCF)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare <= 1 Hour 0
Total Flare > 1 Hour 0
Volume Flared 0
Measured Safety Pilot 7,229
Continuous Assist 65,943
TOTAL FLARED 73,172
Hilcorp Energy Company ALASKA
CONSERVATION ORDER NO. 219
PRUDHOE BAY, POINT MCINTYRE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Sep-23
VOLUME PLANNED
DATE TIME (MSCF)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare <= 1 Hour 0
Total Flare > 1 Hour 0
Volume Flared 0
Measured Safety Pilot 2,700
Continuous Assist 24,619
TOTAL FLARED 27,319
Hilcorp Energy Company ALASKA
CONSERVATION ORDER NO. 219
PRUDHOE BAY, WEST BEACH
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Sep-23
VOLUME PLANNED
DATE TIME (MSCF)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare <= 1 Hour 0
Total Flare > 1 Hour 0
Volume Flared 0
Measured Safety Pilot 0
Continuous Assist 0
TOTAL FLARED 0
Hilcorp Energy Company ALASKA
CONSERVATION ORDER NO. 219
PRUDHOE BAY, NORTH PRUDHOE BAY
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Sep-23
VOLUME PLANNED
DATE TIME (MSCF)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare <= 1 Hour 0
Total Flare > 1 Hour 0
Volume Flared 0
Measured Safety Pilot 0
Continuous Assist 0
TOTAL FLARED 0
Hilcorp Energy Company ALASKA
CONSERVATION ORDER NO. 219
PRUDHOE BAY, COMBINED NIAKUK
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Sep-23
VOLUME PLANNED
DATE TIME (Mscf)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare <= 1 Hour 0
Total Flare > 1 Hour 0
Volume Flared 0
Measured Safety Pilot 28
Continuous Assist 259
TOTAL FLARED 287
Hilcorp Energy Company ALASKA
CONSERVATION ORDER NO. 219
PRUDHOE BAY, RAVEN
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Sep-23
VOLUME PLANNED
DATE TIME (Mscf)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare <= 1 Hour 0
Total Flare > 1 Hour 0
Volume Flared 0
Measured Safety Pilot 165
Continuous Assist 1,514
TOTAL FLARED 1,679
2. Facility Name
PBU LISBURNE PROD (GPMA)
Percent
56.4%
0.2%
0.0%
0.1%
14.4%
0.0%
0.0%
0.3%
28.6%
19. Remarks:
Pt McIntyre NGLs at CGF gas equivalent = 17,156; Pt McIntyre LPC Rich Gas NGLs at CGF gas equivalent = 4,360 and
Lisburne LPC Rich Gas NGLs at CGF gas equivalent = 8,713;
Block 18: LPC Rich Gas to CGF = 1,767,993
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number 3. Field 4. Operator 5. Month/Year of Disposition
0290000009 PBU - GPMA Hilcorp October-2023
Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold 144,346 Pool Name Pool Code
7. Reinjected 8,171,747 Prudhoe Bay, Lisburne Oil 640144
Prudhoe Bay, Niakuk Oil 640148
8. Flared or vented 1 hour or less 511 Prudhoe Bay, W Bch Tr Un 640187
Prudhoe Bay, Sag Riv Undef 640165
9. Flared or vented more than 1 hour (see instr.)0 Prudhoe Bay, Prudhoe Oil 640150
Prudhoe Bay, W Beach Oil 640186
10. Pilot and Purge 12,577 Prudhoe Bay, N Prudhoe Bay 640152
Prudhoe Bay, Raven Oil 640147
Prudhoe Bay, Pt Mcintyre Oil 640180
12. Fuel gas used in lease operations.963,812 AOGCC Use Only
13. Other (see instructions)3,364,037
MCF
Safety:
Lease Use:
14. TOTAL VOLUME (ITEMS 6-13)12,776,521
11. Assist Gas 119,491
MCFAuthorization >1 hr:
Conservation:MCF
15. NGL Gas Equivalent 144,346
MCF
16. Purchased gas 0
Waste:
Contact Phone:Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60° F. Authority 20 AAC 25.235.Contact Email:Richard.Everett@hilcorp.com
Form 10-422 Revised 10/2021
Reviewed by:
COMMISSIONER
Title: Senior Accounting Advisor
713-757-7133
Comm.Comm.
Block 13: Lift Gas Off Field; Block 17: MI from Prudhoe = 2,369,102 and Fuel Gas from Prudhoe = 0
17. Transferred from:2,369,102
18. Transferred to: (Express as a negative #)-1,767,993
I hereby certify that the foregoing is true and correct to the best of my knowledge. Revision? Date of Revision:
Authorized Name and Digital Signature with Date:
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
Hilcorp Energy Company ALASKA
CONSERVATION ORDER NO. 219
PRUDHOE BAY, PRUDHOE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Oct-23
VOLUME PLANNED
DATE TIME (Mscf)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
10/6/2023 0124-0128 2 P
10/14/2023 0122-0125 46 P
10/14/2023 1432-1434 17 U
Total Flare <= 1 Hour 65
Total Flare > 1 Hour 0
Volume Flared 65
Measured Safety Pilot 1,806
Continuous Assist 17,090
TOTAL FLARED 18,961
Hilcorp Energy Company ALASKA
CONSERVATION ORDER NO. 219
PRUDHOE BAY, LISBURNE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Oct-23
VOLUME PLANNED
DATE TIME (MSCF)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
10/6/2023 0124-0128 120 P
10/14/2023 0122-0125 130 P
10/14/2023 1432-1434 44 U
Total Flare <= 1 Hour 294
Total Flare > 1 Hour 0
Volume Flared 294
Measured Safety Pilot 7,091
Continuous Assist 67,415
TOTAL FLARED 74,800
Hilcorp Energy Company ALASKA
CONSERVATION ORDER NO. 219
PRUDHOE BAY, POINT MCINTYRE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Oct-23
VOLUME PLANNED
DATE TIME (MSCF)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
10/6/2023 0124-0128 123 P
10/14/2023 0122-0125 21 P
10/14/2023 1432-1434 7 U
Total Flare <= 1 Hour 151
Total Flare > 1 Hour 0
Volume Flared 151
Measured Safety Pilot 3,599
Continuous Assist 34,225
TOTAL FLARED 37,975
Hilcorp Energy Company ALASKA
CONSERVATION ORDER NO. 219
PRUDHOE BAY, WEST BEACH
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Oct-23
VOLUME PLANNED
DATE TIME (MSCF)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
10/6/2023 0124-0128 0 P
10/14/2023 0122-0125 0 P
10/14/2023 1432-1434 0 U
Total Flare <= 1 Hour 0
Total Flare > 1 Hour 0
Volume Flared 0
Measured Safety Pilot 0
Continuous Assist 0
TOTAL FLARED 0
Hilcorp Energy Company ALASKA
CONSERVATION ORDER NO. 219
PRUDHOE BAY, NORTH PRUDHOE BAY
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Oct-23
VOLUME PLANNED
DATE TIME (MSCF)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
10/6/2023 0124-0128 0 P
10/14/2023 0122-0125 0 P
10/14/2023 1432-1434 0 U
Total Flare <= 1 Hour 0
Total Flare > 1 Hour 0
Volume Flared 0
Measured Safety Pilot 0
Continuous Assist 0
TOTAL FLARED 0
Hilcorp Energy Company ALASKA
CONSERVATION ORDER NO. 219
PRUDHOE BAY, COMBINED NIAKUK
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Oct-23
VOLUME PLANNED
DATE TIME (Mscf)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
10/6/2023 0124-0128 0 P
10/14/2023 0122-0125 1 P
10/14/2023 1432-1434 0 U
Total Flare <= 1 Hour 1
Total Flare > 1 Hour 0
Volume Flared 1
Measured Safety Pilot 28
Continuous Assist 263
TOTAL FLARED 292
Hilcorp Energy Company ALASKA
CONSERVATION ORDER NO. 219
PRUDHOE BAY, RAVEN
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Oct-23
VOLUME PLANNED
DATE TIME (Mscf)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
10/6/2023 0124-0128 0 P
10/14/2023 0122-0125 0 P
10/14/2023 1432-1434 0 U
Total Flare <= 1 Hour 0
Total Flare > 1 Hour 0
Volume Flared 0
Measured Safety Pilot 53
Continuous Assist 498
TOTAL FLARED 551
2. Facility Name
PBU LISBURNE PROD (GPMA)
Percent
54.0%
0.2%
0.0%
0.3%
14.2%
0.0%
0.0%
0.3%
31.2%
19. Remarks:
Pt McIntyre NGLs at CGF gas equivalent = 22,628; Pt McIntyre LPC Rich Gas NGLs at CGF gas equivalent = 4,545 and
Lisburne LPC Rich Gas NGLs at CGF gas equivalent = 7,871;
Block 18: LPC Rich Gas to CGF = 1,724,229
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number 3. Field 4. Operator 5. Month/Year of Disposition
0290000009 PBU - GPMA Hilcorp November-2023
Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold 154,901 Pool Name Pool Code
7. Reinjected 8,585,535 Prudhoe Bay, Lisburne Oil 640144
Prudhoe Bay, Niakuk Oil 640148
8. Flared or vented 1 hour or less 17 Prudhoe Bay, W Bch Tr Un 640187
Prudhoe Bay, Sag Riv Undef 640165
9. Flared or vented more than 1 hour (see instr.)0 Prudhoe Bay, Prudhoe Oil 640150
Prudhoe Bay, W Beach Oil 640186
10. Pilot and Purge 12,483 Prudhoe Bay, N Prudhoe Bay 640152
Prudhoe Bay, Raven Oil 640147
Prudhoe Bay, Pt Mcintyre Oil 640180
12. Fuel gas used in lease operations.909,191 AOGCC Use Only
13. Other (see instructions)3,333,293
MCF
Safety:
Lease Use:
14. TOTAL VOLUME (ITEMS 6-13)13,106,363
11. Assist Gas 110,943
MCFAuthorization >1 hr:
Conservation:MCF
15. NGL Gas Equivalent 154,901
MCF
16. Purchased gas 0
Waste:
Contact Phone:Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60° F. Authority 20 AAC 25.235.Contact Email:Richard.Everett@hilcorp.com
Form 10-422 Revised 10/2021
Reviewed by:
COMMISSIONER
Title: Senior Accounting Advisor
713-757-7133
Comm.Comm.
Block 13: Lift Gas Off Field; Block 17: MI from Prudhoe = 2,200,449 and Fuel Gas from Prudhoe = 0
17. Transferred from:2,200,449
18. Transferred to: (Express as a negative #)-1,724,229
I hereby certify that the foregoing is true and correct to the best of my knowledge. Revision? Date of Revision:
Authorized Name and Digital Signature with Date:
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
Hilcorp Energy Company ALASKA
CONSERVATION ORDER NO. 219
PRUDHOE BAY, PRUDHOE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Nov-23
VOLUME PLANNED
DATE TIME (Mscf)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
11/9/2023 16:04-16:05 2 U
11/10/2023 09:49-09:50 0 U
11/25/2023 13:58-13:59 0 U
Total Flare <= 1 Hour 2
Total Flare > 1 Hour 0
Volume Flared 2
Measured Safety Pilot 1,771
Continuous Assist 15,746
TOTAL FLARED 17,519
Hilcorp Energy Company ALASKA
CONSERVATION ORDER NO. 219
PRUDHOE BAY, LISBURNE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Nov-23
VOLUME PLANNED
DATE TIME (MSCF)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
11/9/2023 16:04-16:05 8 U
11/10/2023 09:49-09:50 1 U
11/25/2023 13:58-13:59 1 U
Total Flare <= 1 Hour 10
Total Flare > 1 Hour 0
Volume Flared 10
Measured Safety Pilot 6,732
Continuous Assist 59,868
TOTAL FLARED 66,610
Hilcorp Energy Company ALASKA
CONSERVATION ORDER NO. 219
PRUDHOE BAY, POINT MCINTYRE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Nov-23
VOLUME PLANNED
DATE TIME (MSCF)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
11/9/2023 16:04-16:05 4 U
11/10/2023 09:49-09:50 1 U
11/25/2023 13:58-13:59 0 U
Total Flare <= 1 Hour 5
Total Flare > 1 Hour 0
Volume Flared 5
Measured Safety Pilot 3,889
Continuous Assist 34,519
TOTAL FLARED 38,413
Hilcorp Energy Company ALASKA
CONSERVATION ORDER NO. 219
PRUDHOE BAY, WEST BEACH
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Nov-23
VOLUME PLANNED
DATE TIME (MSCF)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
11/9/2023 16:04-16:05 0 U
11/10/2023 09:49-09:50 0 U
11/25/2023 13:58-13:59 0 U
Total Flare <= 1 Hour 0
Total Flare > 1 Hour 0
Volume Flared 0
Measured Safety Pilot 0
Continuous Assist 0
TOTAL FLARED 0
Hilcorp Energy Company ALASKA
CONSERVATION ORDER NO. 219
PRUDHOE BAY, NORTH PRUDHOE BAY
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Nov-23
VOLUME PLANNED
DATE TIME (MSCF)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
11/9/2023 16:04-16:05 0 U
11/10/2023 09:49-09:50 0 U
11/25/2023 13:58-13:59 0 U
Total Flare <= 1 Hour 0
Total Flare > 1 Hour 0
Volume Flared 0
Measured Safety Pilot 0
Continuous Assist 0
TOTAL FLARED 0
Hilcorp Energy Company ALASKA
CONSERVATION ORDER NO. 219
PRUDHOE BAY, COMBINED NIAKUK
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Nov-23
VOLUME PLANNED
DATE TIME (Mscf)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
11/9/2023 16:04-16:05 0 U
11/10/2023 09:49-09:50 0 U
11/25/2023 13:58-13:59 0 U
Total Flare <= 1 Hour 0
Total Flare > 1 Hour 0
Volume Flared 0
Measured Safety Pilot 25
Continuous Assist 217
TOTAL FLARED 242
Hilcorp Energy Company ALASKA
CONSERVATION ORDER NO. 219
PRUDHOE BAY, RAVEN
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Nov-23
VOLUME PLANNED
DATE TIME (Mscf)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
11/9/2023 16:04-16:05 0 U
11/10/2023 09:49-09:50 0 U
11/25/2023 13:58-13:59 0 U
Total Flare <= 1 Hour 0
Total Flare > 1 Hour 0
Volume Flared 0
Measured Safety Pilot 66
Continuous Assist 593
TOTAL FLARED 659
2. Facility Name
PBU LISBURNE PROD (GPMA)
Percent
57.2%
0.3%
0.0%
0.1%
14.0%
0.0%
0.0%
1.3%
27.1%
19. Remarks:
Pt McIntyre NGLs at CGF gas equivalent = 27,212; Pt McIntyre LPC Rich Gas NGLs at CGF gas equivalent = 4,176 and
Lisburne LPC Rich Gas NGLs at CGF gas equivalent = 8,818;
Block 18: LPC Rich Gas to CGF = 1,831,887
Form 10-422 Revised 10/2021
Reviewed by:
COMMISSIONER
Title: Senior Accounting Advisor
713-757-7133
Comm.Comm.
Block 13: Lift Gas Off Field; Block 17: MI from Prudhoe = 2,562,648 and Fuel Gas from Prudhoe = 0
17. Transferred from:2,562,648
18. Transferred to: (Express as a negative #)-1,831,887
I hereby certify that the foregoing is true and correct to the best of my knowledge. Revision? Date of Revision:
Authorized Name and Digital Signature with Date:
Contact Phone:Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60° F. Authority 20 AAC 25.235.Contact Email:Richard.Everett@hilcorp.com
MCFAuthorization >1 hr:
Conservation:MCF
15. NGL Gas Equivalent 163,259
MCF
16. Purchased gas 0
Waste:
Prudhoe Bay, Pt Mcintyre Oil 640180
12. Fuel gas used in lease operations.900,770 AOGCC Use Only
13. Other (see instructions)3,678,985
MCF
Safety:
Lease Use:
14. TOTAL VOLUME (ITEMS 6-13)13,651,916
11. Assist Gas 117,731
10. Pilot and Purge 13,054 Prudhoe Bay, N Prudhoe Bay 640152
Prudhoe Bay, Raven Oil 640147
9. Flared or vented more than 1 hour (see instr.)0 Prudhoe Bay, Prudhoe Oil 640150
Prudhoe Bay, W Beach Oil 640186
Prudhoe Bay, Niakuk Oil 640148
8. Flared or vented 1 hour or less 201 Prudhoe Bay, W Bch Tr Un 640187
Prudhoe Bay, Sag Riv Undef 640165
0290000009 PBU - GPMA Hilcorp December-2023
Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold 163,259 Pool Name Pool Code
7. Reinjected 8,777,916 Prudhoe Bay, Lisburne Oil 640144
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number 3. Field 4. Operator 5. Month/Year of Disposition
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
Hilcorp Energy Company ALASKA
CONSERVATION ORDER NO. 219
PRUDHOE BAY, PRUDHOE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Dec-23
VOLUME PLANNED
DATE TIME (Mscf)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
12/23/2023 12:49-13:20 28 U
Total Flare <= 1 Hour 28
Total Flare > 1 Hour 0
Volume Flared 28
Measured Safety Pilot 1,822
Continuous Assist 16,430
TOTAL FLARED 18,280
Hilcorp Energy Company ALASKA
CONSERVATION ORDER NO. 219
PRUDHOE BAY, LISBURNE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Dec-23
VOLUME PLANNED
DATE TIME (MSCF)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
12/23/2023 12:49-13:20 120 U
Total Flare <= 1 Hour 120
Total Flare > 1 Hour 0
Volume Flared 120
Measured Safety Pilot 7,472
Continuous Assist 67,386
TOTAL FLARED 74,978
Hilcorp Energy Company ALASKA
CONSERVATION ORDER NO. 219
PRUDHOE BAY, POINT MCINTYRE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Dec-23
VOLUME PLANNED
DATE TIME (MSCF)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
12/23/2023 12:49-13:20 50 U
Total Flare <= 1 Hour 50
Total Flare > 1 Hour 0
Volume Flared 50
Measured Safety Pilot 3,540
Continuous Assist 31,924
TOTAL FLARED 35,514
Hilcorp Energy Company ALASKA
CONSERVATION ORDER NO. 219
PRUDHOE BAY, WEST BEACH
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Dec-23
VOLUME PLANNED
DATE TIME (MSCF)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
12/23/2023 12:49-13:20 0 U
Total Flare <= 1 Hour 0
Total Flare > 1 Hour 0
Volume Flared 0
Measured Safety Pilot 0
Continuous Assist 0
TOTAL FLARED 0
Hilcorp Energy Company ALASKA
CONSERVATION ORDER NO. 219
PRUDHOE BAY, NORTH PRUDHOE BAY
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Dec-23
VOLUME PLANNED
DATE TIME (MSCF)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
12/23/2023 12:49-13:20 0 U
Total Flare <= 1 Hour 0
Total Flare > 1 Hour 0
Volume Flared 0
Measured Safety Pilot 0
Continuous Assist 0
TOTAL FLARED 0
Hilcorp Energy Company ALASKA
CONSERVATION ORDER NO. 219
PRUDHOE BAY, COMBINED NIAKUK
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Dec-23
VOLUME PLANNED
DATE TIME (Mscf)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
12/23/2023 12:49-13:20 1 U
Total Flare <= 1 Hour 1
Total Flare > 1 Hour 0
Volume Flared 1
Measured Safety Pilot 34
Continuous Assist 313
TOTAL FLARED 348
Hilcorp Energy Company ALASKA
CONSERVATION ORDER NO. 219
PRUDHOE BAY, RAVEN
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Dec-23
VOLUME PLANNED
DATE TIME (Mscf)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
12/23/2023 12:49-13:20 2 U
Total Flare <= 1 Hour 2
Total Flare > 1 Hour 0
Volume Flared 2
Measured Safety Pilot 186
Continuous Assist 1,678