Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
HOME
EVENTS
DATA
Data List
Drilling
Production
Orders
Data Miner
Document Search
REPORTS
Reports and Charts
Pool Statistics
FORMS
LINKS
Links
Test Notification
Data Requests
Regulations
Industry Guidance Bulletins
How to Apply
ABOUT US
History
Staff
HELP
Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
177-059
CAUTION: This email originated from outside the State of Alaska mail system. Do not click links or open attachments unless you recognize the sender and know the content is safe. From:Davies, Stephen F (OGC) To:Gluyas, Gavin R (OGC) Subject:FW: [EXTERNAL] Completed Sundry 325-299 Date:Tuesday, June 3, 2025 7:04:54 AM Attachments:image001.png image003.png image002.png Gavin, Please place a copy of the email below in the well history file for PBU 01-13 (PTD 177-059). Thanks, Steve From: Joseph Lastufka <Joseph.Lastufka@hilcorp.com> Sent: Monday, June 2, 2025 3:26 PM To: Davies, Stephen F (OGC) <steve.davies@alaska.gov>; Guhl, Meredith D (OGC) <meredith.guhl@alaska.gov> Cc: David Douglas <David.Douglas@hilcorp.com> Subject: FW: [EXTERNAL] Completed Sundry 325-299 Steve, I was able to locate the final TD for 01-13 (PTD #177-059). Please project 1978 Gyro survey to TD at 10760’ MD. As far as conductor depths, I am happy to discuss how I submit them which in many cases is different from the original Completion Report, specifically with these older wells. In this case, the conductor was set 80’ below ground level which would not be set at 125’. Thanks, CAUTION: External sender. DO NOT open links or attachments from UNKNOWN senders. Joe Lastufka Sr. Drilling Technologist Hilcorp North Slope, LLC Office: (907)777-8400, Cell:(907)227-8496 From: Christianson, Grace K (OGC) <grace.christianson@alaska.gov> Sent: Monday, June 2, 2025 1:41 PM To: Abbie Barker <Abbie.Barker@hilcorp.com>; Carrie Janowski <Carrie.Janowski@hilcorp.com>; Cody Dinger <cdinger@hilcorp.com>; Daniel Taylor <dtaylor@hilcorp.com>; Darci Horner <dhorner@hilcorp.com>; Donna Ambruz <dambruz@hilcorp.com>; Abhijeet Tambe - (C) <abhijeet.tambe@hilcorp.com>; Jerimiah Galloway <jerimiah.Galloway@hilcorp.com>; Joseph Lastufka <Joseph.Lastufka@hilcorp.com>; Josh Allely - (C) <josh.allely@hilcorp.com>; Juanita Lovett <jlovett@hilcorp.com>; Tom Fouts <tfouts@hilcorp.com> Cc: Lau, Jack J (OGC) <jack.lau@alaska.gov> Subject: [EXTERNAL] Completed Sundry 325-299 Hello, Attached is the completed Sundry for PBU 01-13. Thank you, Grace Christianson Executive Assistant, Alaska Oil & Gas Conservation Commission (907) 793-1230 CONFIDENTIALITY NOTICE: This e-mail message, including any attachments, contains information from the Alaska Oil and Gas Conservation Commission (AOGCC), State of Alaska, and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged information. The unauthorized review, use, or disclosure of such information may violate state or federal law. If you are an unintended recipient of this e-mail, please delete it without first saving or forwarding it, and so that the AOGCC is aware of the mistake in sending it to you, contact Grace Christianson at (907-793-1230) or (grace.christianson@alaska.gov). The information contained in this email message is confidential and may be legally privileged and is intended only for the use of the individual or entity named above. If you are not an intended recipientor if you have received this message in error, you are hereby notified that any dissemination, distribution, or copy of this email is strictly prohibited. If you have received this email in error, pleaseimmediately notify us by return email or telephone if the sender's phone number is listed above, then promptly and permanently delete this message. While all reasonable care has been taken to avoid the transmission of viruses, it is the responsibility of the recipient to ensure that the onward transmission, opening, or use of this message and anyattachments will not adversely affect its systems or data. No responsibility is accepted by the company in this regard and the recipient should carry out such virus and other checks as it considersappropriate. 9913, 10226, 10410 Joe Engel for Sean McLaughlin By Grace Christianson at 3:45 pm, May 13, 2025 Digitally signed by Joseph Engel (2493) DN: cn=Joseph Engel (2493) Date: 2025.05.08 13:36:10 - 08'00' Joseph Engel (2493) 325-299 * Per original Well Completion Report dated 7/7/1982 SFD 9,432*10,740* JJL 5/14/25 SFD SFD 5/27/2025 SFD 10-407 SFD 125* *Variance as per 20 AAC 25.112(i): Approved for alternate abandonment plug placement on parent well contingent upon fully cemented liner on upcoming sidetrack. *Window milling on service coil not approved on 10-403, refer to sidetrack PTD for approval. 125* *&: Jessie L. Chmielowski Digitally signed by Jessie L. Chmielowski Date: 2025.06.02 13:28:01 -08'00' 06/02/25 RBDMS JSB 060225 To: Alaska Oil & Gas Conservation Commission From:Ryan Ciolkosz Drilling Engineer Date: May 8, 2025 Re:01-13 Sundry Request Sundry approval is requested to set a whipstock in the 01-13 wellbore as part of the drilling and completion of the proposed 01-13A CTD lateral. Proposed plan: See 01-13 Sundry request for complete pre-rig details - Prior to drilling activities, screening will be conducted to drift for whipstock and MIT. E-line or coil will mill the XN-nipple. E-line will set a 4-1/2" whipstock. If unable to set the whipstock pre-rig, the rig will perform that work. A coil tubing drilling sidetrack will be drilled with the Nabors CDR2 or CDR3 rig. The rig will move in, test BOPE and kill the well. If unable to pre-rig, the rig will set the 4-1/2" whipstock and mill a single string 3.80" window + 10' of formation. The well will kick off drilling in the Shublik and lands in Ivishak Zone 2. The lateral will continue in Zone 4, 3 and 2 to TD. The proposed sidetrack will be completed with a 3-1/2"x3-1/4"x2-7/8” 13Cr solid liner, cemented in place and selectively perforated post rig (will be perforated with rig if unable to post rig). This completion will completely isolate and abandon the parent Prudhoe Pool perfs. 20 AAC 25.112(i) Variance Request: Hilcorp requests to plug the existing perforations via the liner cement job, packer whipstock and/or liner top packer, if the liner lap pressure test fails as an alternate plug placement. The following describes work planned and is submitted as an attachment to Form 10-403. A schematic diagram of the current wellbore and proposed sidetrack is attached for reference. Pre-Rig Work: (Estimated to start in June 2nd, 2025) 1. Slickline : Dummy WS drift, DMY GLVs 2. E-Line : Set 4-1/2" NS Whipstock at 9895’ MD at 180 degrees ROHS 3. Fullbore : MIT-IA and/or MIT-T to 2500 psi psi 4. Coil : Mill XN nipple (at 9685' MD) 5. Valve Shop : Pre-CTD Tree Work 6. Operations : Remove wellhouse and level pad. Rig Work: (Estimated to start in July 18th, 2025) x Reference 01-13A Permit submitted in concert with this request for full details. 1. MIRU and test BOPE 250 psi low and 3,500 psi high (MASP 2396 psi). Give AOGCC 24hr notice prior to BOPE test. 2. Mill 3.80” Dual String Window (4-1/2"x9-5/8") @ 180 deg ROHS 3. Drill build section: 4.25" OH, ~440' (35 deg DLS planned). 4. Drill production lateral: 4.25" OH, ~2055' (12 deg DLS planned). Swap to KWF for liner. 5. Run 3-1/2” x 3-1/4” x 2-7/8” 13Cr solid liner (swap to VBRs and test prior to running liner) 6. Pump primary cement job: 33 bbls, 15.3 ppg Class G, 1.24 (ft3/sk), TOC at TOL*. 7. Only if not able to do with service coil extended perf post rig – Perforate Liner 8. Freeze protect well to a min 2,200' TVD. 9. Close in tree, RDMO. * Alternate plug placement variance request per 20 AAC 25.112(i) Post Rig Work: 1. Valve Shop : Valve & tree work 2. Slickline : Set LTP* (if necessary). Set live GLVs. 3. Service Coil : Post rig RPM and perforate (~30’) - see extended perf procedure attached. 4. Testing : Portable test separator flowback. Ryan Ciolkosz CC: Well File Drilling Engineer Joe Lastufka 907-244-4357 Well Date Quick Test Sub to Otis -1.1 ft Top of 7" Otis 0.0 ft Distances from top of riser Excluding quick-test sub Top of Annular 2.75 ft C L Annular 3.40 ft Bottom Annular 4.75 ft CL Blind/Shears 6.09 ft CL 2-3/8" Pipe / Slips 6.95 ft B3 B4 B1 B2 Kill Line Choke Line CL 3.0" Pipe / Slip 9.54 ft CL 2-3/8" Pipe / Slips 10.40 ft TV1 TV2 T1 T2 Flow Tee Master Master LDS IA OA LDS Ground Level 3" LP hose open ended to Flowline CDR2-AC BOP Schematic CDR2 Rig's Drip Pan Fill Line from HF2 Normally Disconnected 3" HP hose to Micromotion Hydril 7 1/16" Annular Blind/Shear 2-3/8" Pipe/Slips 2 3/8" Pipe/Slips 2 3/8" Pipe/Slips 7-1/16" 5k Mud Cross 2-3/8" Pipe/Slips 3"or 3-1/8" Pipe / Slip Well Date Quick Test Sub to Otis Top of 7" Otis Top of Annular C L Annular Bottom Annular CL Blind/Shears CL 2-3/8" Pipe / Slips B6 B5 B8 B7 Choke Line Kill Line CL 3" Pipe / Slip CL 2-3/8" Pipe / Slips TV1 TV2 T1 T2 Flow Tee Master Master LDS IA OA LDS Ground Level CDR3-AC BOP Schematic CDR3 Rig's Drip Pan Fill Line Normally Disconnected 2" HP hose to Micromotion Hydril 7 1/16" Annular Blind/Shear 2-3/8" Pipe/Slips 2 3/8" Pipe/Slips 2 3/8" Pipe/Slips 7-1/16" 5k Mud Cross 2-3/8" Pipe/Slips 3" Pipe / Slip neceeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeee 7. Property Designation (Lease Number): 1. Operations Performed: 2. Operator Name: 3. Address: 4. Well Class Before Work:5. Permit to Drill Number: 6. API Number: 8. Well Name and Number: 9. Logs (List logs and submit electronic data per 20AAC25.071): 10. Field/Pool(s): Susp Well Insp Install Whipstock Mod Artificial Lift Perforate New Pool Perforate Plug Perforations Coiled Tubing Ops Other Stimulate Fracture Stimulate Alter Casing Pull Tubing Repair Well Other: Change Approved Program Operations shutdown 11. Present Well Condition Summary: Casing Length Size MD TVD Burst Collapse Exploratory Stratigraphic Development Service 14. Attachments (required per 20 AAC 25.070, 25.071, & 25.283) 16. Well Status after work: 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. OIL GAS WINJ WAG GINJ WDSPL GSTOR Suspended SPLUG Authorized Name and Digital Signature with Date: Authorized Title: Contact Name: Contact Email: Contact Phone: PBU 01-13 Hilcorp North Slope, LLC 3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 177-059 50-029-20270-00-00 10740 Conductor Surface Production Scab Liner Scab Liner 9450 80 2694 8378 9676 550 9913 20" 13-3/8" 9-5/8" 7" 4-1/2" 8722 35 - 115 34 - 2728 2360 - 10738 33 - 9709 9701 - 10251 35 - 115 34 - 2728 2360 - 9431 33 - 8545 8538 - 9014 10220 520 2670 4760 5410 7500 9913 , 10410 1530 4930 6870 7240 8430 9861 - 10629 4-1/2" 12.6# 13Cr80 28 - 9744 8677 - 9337 Structural 4-1/2" HES TNT Perm , 9532 , 8390 No SSSV 9532 8390 Bo York Operations Manager David Bjork David.Bjork@hilcorp.com 907.564.4672 PRUDHOE BAY, PRUDHOE OIL Total Depth Effective Depth measured true vertical feet feet feet feet measured true vertical measured measured feet feet feet feet measured true vertical Plugs Junk Packer Measured depth True Vertical depth feet feet Perforation depth Tubing (size, grade, measured and true vertical depth) Packers and SSSV (type, measured and true vertical depth) 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13a.Representative Daily Average Production or Injection Data Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: Subsequent to operation: 15. Well Class after work: Exploratory Development Service StratigraphicDaily Report of Well Operations Copies of Logs and Surveys Run Electronic Fracture Stimulation Data Sundry Number or N/A if C.O. Exempt: ADL 0028329 28 - 8575 375 175 42827 6591 3145 13 135 127 925 207 N/A 13b. Pools active after work:PRUDHOE OIL STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS Sr Pet Eng: Sr Pet Geo: Form 10-404 Revised 10/2022 Submit in PDF format to aogcc.permitting@alaska.gov Sr Res Eng: Due Within 30 days of Operations By Grace Christianson at 12:35 pm, Nov 21, 2024 Digitally signed by Bo York (1248) DN: cn=Bo York (1248) Date: 2024.11.21 09:57:59 - 09'00' Bo York (1248) DSR-11/21/24 RBDMS JSB 112724 WCB 2-7-2025 ACTIVITYDATE SUMMARY 10/23/2024 *** WELL SI ON ARRIVAL *** (ELINE DRIFT, CIBP, ADPERF) MIRU YJ ELINE PT PCE 300/3000 PSI, WLV FUNCTIONED. RUN 3.62" JUNK BASKET / GAUGE RING TO 10020 FT CORRELATE TO SLB PERF RECORD 01 NOV 2015 LOAD AND KILL WELL W/ 160 BBL CRUDE SET CIBP AT 9913 FT, CCL - ME = 12.2 FT, CCL STOP 9900.8 FT, GOOD WEIGHT LOSS, TAGGED, WHP=0 PSI PT PLUG 700 PSI, GOOD SHOOT 9861-9886 FT, 6 SPF 60 DEG, 3-1/8", CCL OFFSET 9.2 FT, CCL STOP 9851.8 FT. CONFIRM ALL SHOTS FIRED RDMO YJ ELINE *** WELL SI ON DEPARTURE, ELINE COMPLETE *** 10/23/2024 T/I/O= 2416/129/16 LRS Unit 76 Assist E-Line (PERFORATING) Pumped 195 BBLS Crude to load the well as directed. Test Bridge Plug to700 PSI. FWHP's 712/127/17 E-Line has control of the well. DSO notified of well status upon LRS departure. Daily Report of Well Operations PBU 01-13 SHOOT 9861-9886 FT SET CIBP AT 9913 FT 7. Property Designation (Lease Number): 1. Operations Performed: 2. Operator Name: 3. Address: 4. Well Class Before Work:5. Permit to Drill Number: 6. API Number: 8. Well Name and Number: 9. Logs (List logs and submit electronic data per 20AAC25.071): 10. Field/Pool(s): Susp Well Insp Install Whipstock Mod Artificial Lift Perforate New Pool Perforate Plug Perforations Coiled Tubing Ops Other Stimulate Fracture Stimulate Alter Casing Pull Tubing Repair Well Other: Change Approved Program Operations shutdown 11. Present Well Condition Summary: Casing Length Size MD TVD Burst Collapse Exploratory Stratigraphic Development Service 14. Attachments (required per 20 AAC 25.070, 25.071, & 25.283) 16. Well Status after work: 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. OIL GAS WINJ WAG GINJ WDSPL GSTOR Suspended SPLUG Authorized Name and Digital Signature with Date: Authorized Title: Contact Name: Contact Email: Contact Phone: PBU 01-13 Mill CIBP Hilcorp North Slope, LLC 3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 177-059 50-029-20270-00-00 10740 Conductor Surface Production Scab Liner Scab Liner 9450 80 2694 8378 9676 550 10226 20" 13-3/8" 9-5/8" 7" 4-1/2" 8993 35 - 115 34 - 2728 2360 - 10738 33 - 9709 9701 - 10251 35 - 115 34 - 2728 2360 - 9431 33 - 8545 8538 - 9014 10220 520 2670 4760 5410 7500 10226 , 10410 1530 4930 6870 7240 8430 10012 - 10629 4-1/2" 12.6# 13Cr80 28 - 9744 8807 - 9337 Structural 4-1/2" HES TNT Perm , 9532 , 8390 No SSSV 9532 8390 Bo York Operations Manager David Bjork David.Bjork@hilcorp.com 907.564.4672 PRUDHOE BAY, PRUDHOE OIL Total Depth Effective Depth measured true vertical feet feet feet feet measured true vertical measured measured feet feet feet feet measured true vertical Plugs Junk Packer Measured depth True Vertical depth feet feet Perforation depth Tubing (size, grade, measured and true vertical depth) Packers and SSSV (type, measured and true vertical depth) 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13a.Representative Daily Average Production or Injection Data Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: Subsequent to operation: 15. Well Class after work: Exploratory Development Service StratigraphicDaily Report of Well Operations Copies of Logs and Surveys Run Electronic Fracture Stimulation Data Sundry Number or N/A if C.O. Exempt: ADL 0028329 28 - 8575 61 850 7208 61417 1252 1401 1827 836 241 632 N/A 13b. Pools active after work:PRUDHOE OIL STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS Sr Pet Eng: Sr Pet Geo: Form 10-404 Revised 10/2022 Submit in PDF format to aogcc.permitting@alaska.gov Sr Res Eng: Due Within 30 days of Operations By Samantha Coldiron at 9:09 am, Mar 08, 2024 Digitally signed by Bo York (1248) DN: cn=Bo York (1248) Date: 2024.03.07 11:01:47 - 09'00' Bo York (1248) RBDMS JSB 031424 DSR-3/11/24WCB 2024-06-25 ACTIVITYDATE SUMMARY 2/11/2024 CTU #9: 1.75" CT 0.156 wall. Job Scope: Mill 4.5 CIBP MIRU CTU 9. BOP Test. ...Continue on WSR 2/12/24.... 2/12/2024 CTU #9: 1.75" CT 0.156 wall. Job Scope: Mill 4.5 CIBP NU 2' spool & BOPs. MU YJ 2-7/8 milling BHA w/ 3.70" 5 blade junk mill. Fnc Test BOPs. RIH & Tag CIBP @ 10,071' CTM / 10,095' Mech. Mill and push down to 10,220' CTMD. POOH, Freeze protect well to 2500' w/5 bbls 50/40 and 33bbls diesel (38bbls total). RDMO ...Job Complete.... Daily Report of Well Operations PBU 01-13 Milled CIBP fish is correctly shown on the new WBS, below. -WCB gj RIH & Tag CIBP @ 10,071' CTM / 10,095' Mech. Mill and push down tog 10,220' CTMD. POOH Nolan Vlahovich Hilcorp Alaska, LLC Geo Tech 3800 Centerpoint Drive, Suite 1400 Anchorage, AK 99503 Tele: (907) 564-4558 E-mail: Kyle.Wiseman@hilcorp.com Please acknowledge receipt by signing and returning one copy of this transmittal. Received By: Date: Date: 06/02/2023 To: Alaska Oil & Gas Conservation Commission Natural Resource Technician 333 W 7th Ave Suite 100 Anchorage, AK 99501 SFTP DATA TRANSMITTAL T#20230415 Well API #PTD #Log Date Log Company Log Type AOGCC Eset# END 2-20 50029220480000 190060 4/12/2023 BAKER SPN PBU 01-10 50029201690000 175043 4/15/2023 BAKER SPN PBU 01-13 50029202700000 177059 4/13/2023 BAKER SPN PBU 15-05B 50029207310200 211057 4/24/2023 BAKER RPM PBU 15-09B 50029212010200 212024 4/26/2023 BAKER RPM PBU D-01A 50029200540100 197078 4/15/2023 BAKER SPN PBU D-10 50029203890000 179053 4/17/2023 BAKER SPN PBU E-26B 50029217810200 221084 4/9/2023 BAKER MRPM PBU F-33A 50029226400100 208163 4/20/2023 BAKER SPN PBU J-12 50029204450000 180017 4/17/2022 BAKER SPN PBU J-19 50029216290000 186135 4/18/2023 BAKER SPN PBU N-15 50029206070000 181079 4/20/2023 BAKER SPN PBU R-04 50029203740000 179038 4/21/2023 BAKER SPN PBU R-27 50029215570000 186051 4/22/2023 BAKER SPN PBU Z-25 50029219020000 188159 4/23/2023 BAKER SPN Please include current contact information if different from above. T37696 T37697 T37698 T37699 T37700 T37701 T37702 T37703 T37704 T37705 T37706 T37707 T37708 T37709 T37710 PBU 01-13 50029202700000 177059 4/13/2023 BAKER SPN Kayla Junke Digitally signed by Kayla Junke Date: 2023.06.05 11:18:47 -08'00' 7. Property Designation (Lease Number): 1. Operations Performed: 2. Operator Name: 3. Address: 4. Well Class Before Work:5. Permit to Drill Number: 6. API Number: 8. Well Name and Number: 9. Logs (List logs and submit electronic data per 20AAC25.071): 10. Field/Pool(s): Susp Well Insp Install Whipstock Mod Artificial Lift Perforate New Pool Perforate Plug Perforations Coiled Tubing Ops Other Stimulate Fracture Stimulate Alter Casing Pull Tubing Repair Well Other: Change Approved Program Operations shutdown 11. Present Well Condition Summary: Casing Length Size MD TVD Burst Collapse Exploratory Stratigraphic Development Service 14. Attachments (required per 20 AAC 25.070, 25.071, & 25.283) 16. Well Status after work: 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. OIL GAS WINJ WAG GINJ WDSPL GSTOR Suspended SPLUG Authorized Name and Digital Signature with Date: Authorized Title: Contact Name: Contact Email: Contact Phone: PBU 01-13 Hilcorp North Slope, LLC 3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 177-059 50-029-20270-00-00 10740 Conductor Surface Production Scab Liner Scab Liner 9450 80 2694 8378 9676 550 10085 20" 13-3/8" 9-5/8" 7" 4-1/2" 8871 35 - 115 34 - 2728 2360 - 10738 33 - 9709 9701 - 10251 35 - 115 34 - 2728 2360 - 9431 33 - 8545 8538 - 9014 none 520 2670 4760 5410 7500 10085 , 10410 1530 4930 6870 7240 8430 10012 - 10629 4-1/2" 12.6# 13Cr80 28 - 9744 8807 - 9337 Structural 4-1/2" HES TNT Perm , 9532 , 8390 No SSSV 9532 8390 Bo York Operations Manager David Bjork David.Bjork@hilcorp.com 907.564.4672 PRUDHOE BAY, PRUDHOE OIL Total Depth Effective Depth measured true vertical feet feet feet feet measured true vertical measured measured feet feet feet feet measured true vertical Plugs Junk Packer Measured depth True Vertical depth feet feet Perforation depth Tubing (size, grade, measured and true vertical depth) Packers and SSSV (type, measured and true vertical depth) 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13a.Representative Daily Average Production or Injection Data Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: Subsequent to operation: 15. Well Class after work: Exploratory Development Service StratigraphicDaily Report of Well Operations Copies of Logs and Surveys Run Electronic Fracture Stimulation Data Sundry Number or N/A if C.O. Exempt: ADL 0028329 28 - 8575 302 223 30565 11834 4952 1287 1952 1771 442 259 N/A 13b. Pools active after work:PRUDHOE OIL STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS Sr Pet Eng: Sr Pet Geo: Form 10-404 Revised 10/2022 Submit in PDF format to aogcc.permitting@alaska.gov Sr Res Eng: Due Within 30 days of Operations By Grace Christianson at 1:34 pm, May 18, 2023 Digitally signed by Bo York (1248) DN: cn=Bo York (1248) Date: 2023.05.18 13:14:46 -08'00' RBDMS JSB 072723 DSR-5/22/23WCB 1-4-2024 ACTIVITYDATE SUMMARY 5/8/2023 ***WELL S/I ON ARRIVAL*** PT PCE 250LP-3500HP T-BIRD PUMPS 175 BBLS OF CRUDE TO LOAD TUBING. SET 3.50" CIBP AT 10085' MD, CCL STOP DEPTH=10073.8' , CCL TO ME=11.2'. LOG TIED INTO SLB JEWELRY AND PERF DATED:01-NOV-2015 T-BIRD PRESSURES TEST CIBP AT 10085' MD TO 1500 PSI AND WATCH FOR 5 MINS. SEE LOG FOR RESULTS. PERFORATE WITH 26' X 3-3/8", 6 SPF, 60 DEG PHASED GEO BASIX GUN, CCL STOP DEPTH=10002.2', CCL TO TS=9.8', PERF INT=10012' - 10038' MD ***WELL READY TO POP, OPERATOR NOTIFIED*** 5/8/2023 TFS Unit 4 Assist E-line with load and test, Pump 1 BBLS 60/40 followed by 185 BBLS Crude, FWHP= 550/1425/0 E-Line in control of well upon departure Daily Report of Well Operations PBU 01-13 The CIBP and adperfs are correctly shown on the new WBS, below. -WCB PERFORATE WITH 26' X 3-3/8", 6 SPF, 60 DEG PHASED GEO BASIX GUN, CCL STOP DEPTH=10002.2', CCL TO TS=9.8', PERF INT=10012' - 10038' MD SET 3.50" CIBP AT 10085' MD • • 1 7 70 59 BAKER 0 PRINT DISTRIBUTION LIST 2 9 12 5 HUGHES a GE company Please sign and return one copy of this transmittal form to: COMPANY BP Exploration Alaska Inc. BP Exploration(Alaska) Inc. Petrotechnical Data Center,LR2-1 WELL NAME 01-13 900 E.Benson Blvd. Anchorage,Alaska 99508 or AKGDMINTERNAL@bp.com FIELD Prudhoe Bay Unit to acknowledge receipt of this data. COUNTY PRUDHOE BAY LOG TYPE RPM:PNC3D BHI DISTRICT Alaska --- LOG DATE February 17,2018 AUTHORIZED BY Paul Canizares EMAIL Paul.Canizares@bhge.com TODAYS DATE March 7,2018 Revision STATUS Final Replacement: No Details: Rev. Requested by: --- COMPANY FIELD/ FINAL CD/DVD FINAL PRELIM LOGS (las,dlis,PDF,META, SURVEY REPORT ADDRESS(FEDEX WILL NOT DELIVER TO P.O.BOX) LOGS CGM,Final Surveys) (Compass) PERSON ATTENTION #OF PRINTS #OF H-tIN IS #OF COPIES #OF COPIES #OF COPIES 3 4 3 3 4 4 4 1 BP North Slope. 0 1 1 1 0 EOA,PBOC,PRB-20(Office 109) D&C Wells Project Aides Attn:Benda Glassmaker&Peggy O'Neil 900 E.Benson Blvd. Anchorage,Alaska 99508 2 ConocoPhillips Alaska Inc. 0 0 1 1 0 Attn:Ricky Elgarico ATO 3-344 700 G Street Anchorage,AK 99501 3 ExxonMobil,Alaska 0 I 0 1 1 0 Attn:Lynda M.Yaskell and/or Lisa Boggs 3201 C Street,Suite 505 Anchorage,AK 99503 4 State of Alaska -AOGCC 0 1 1 1 0 !Attn:Makana Bender 1333 W.7th Ave,Suite 100 / Anchorage,Alaska 99501 �►V\ /� ,1,3i/s1/6 V LJ 5 DNR-Division of Oil&Gas *** 0 0 1 1 I 0 Attn:Garret Brown 550 West 7th Avenue,Suite 1100cy�� 2 `3 [Ulu Anchorage,Alaska 99501 SCANNED * *Stamp"confidential"on all material deliver to DNR RECEIVED 11 6 BP Exploration(Alaska)Inc. f I Petrotechnical Data Center,IR2-1 MAR 0 8 2018 900 E.Benson Blvd. Anchorage,Alaska 99508 AOGCC Attn:Gerardo Cedillo TOTALS FOR THIS PAGE: 0 2 5 4 0 61 O6' • • S" 90 cc a) J C7 N Zpi CO a) OJbo m Y V > V 41 � Q(w - Q a) p h O p ns U a V V, j +� O CU E p 0_ '6 W p p 6 I- ca O -' w N LO 1.0 LO r r r CD 0 a p 0 E - m J Q LD r r Y V 4_, ui 4'' N Q ' O a) a) a) C C `^ L 0 0 co c --I O p p C ) CO E a-+ co G Z Q O N N N Q y Z Qw p p _6 E O >. cc V U i.+ H a 4-+ v -5 L a p p J p ro 6 u J J J J J J C y i I- - - W LU LU LU W LU up E Co 0 0 ,71 Q ` F LL LL L- LL LL LL ) E -6 N c < J J J J J J a - o E a) t1. - F- Q Q Q Q Q Q 4_, C = C`. Q Z Z Z Z Z Z N -p `^ U •• � C �:.: LL LL LL LL LL LL cc ^0 no a) u v a) t O 'J O O U• 2 C1 0 o v v CC:, = O '0 Q Ci co OO > `" G) Crz it A O S 0 ~U F Li I- U a in 'z 8j O f m m = oJ0 cwt O ?GI K U o \ UM LLI > al 8 °° V) E0:1 ! W to > w 0 X 0U ri R.'y ~ t" Cr) oo c% b ,54' a - E J� £ E �'VilzM O ,p '° : : : f .Y1 � p Q LU E E Z O O O U W O p 2 2 2 2 ct2 J 0 Cl 0] 1_ O 0 a C W > > p Z m 6 N w OC ceCC a a a Oa a C ° ® eto a_ x n a N r r) 0 r o ILI cD / , M O CO co 0 0 t„/ LZ O O o u O 0 0 0 0 0 0 N O o 0 o Q 0 ca _v - o o, 0 o, U d E ram *.. 'K pp co Q oo (n J a) . i v >:' W Y- v >- x 0 If11�_■ Gil 10 O cc 000000 C H ca Q < Z u W p O O O 0 0 N (D O O ID O O OLn O aA O °CC Mt IYI M M N- O M N O N C E N' O N N N M CN N O )y N N N N N N U C j n an O O O O O O N N N N N N 41 Q1 O0 — O O O O O O •L If) u) u) LC) N C3 a) C.. co C +a • Ou C L cn E U f6 U 1.7. Q) E a) a w C .E 4 l 7 z a M r-- J Cn M03 ro a) 3 a $ a) f7 7 v CA O r E 41 2 3 . Q IN , J o O a J Y E z a) co C w Y +, n STATE OF ALASKA 0LASKA OIL AND GAS CONSERVATION COMM! REPORT OF SUNDRY WELL OPERATI 1. Operations Performed Abandon ❑ Plug Perforations WI Fracture Stimulate 0 Pull Tubing WI Operations shutdown 0 Suspend 0 Perforate El Other Stimulate 0 Alter Casing lI Change Approved Program 0 Plug for Redrill ❑ Perforate New Pool 0 Repair Well ll Re-enter Susp Well 0 Other:Scab Liner/Cement OA WI 2. Operator Name: BP Exploration(Alaska),Inc 4. Well Class Before Work 5. Permit to Drill Number: 177-059 3. Address: P.O.Box 196612 Anchorage, Development I Exploratory 0 AK 99519-6612 Stratigraphic 0 Service ❑ 6. API Number: 50-029-20270-00-00 7. Property Designation(Lease Number): ADL 028329 8. Well Name and Number: PBU 01-13 9. Logs(List logs and submit electronic and printed data per 20AAC25.071): 10. Field/Pools: Cement Evaluation PRUDHOE BAY,PRUDHOE OIL 11.Present Well Condition Summary: RECEIED � W Total Depth: measured 10740 feet Plugs measured None feet lRI! true vertical 9433 feet Junk measured None feet NOV 2 015 4 2 Effective Depth: measured 10226 feet Packer measured 9532 feet U J true vertical 8993 feet Packer true vertical 8390 feet AO C Casing: Length: Size: MD: ND: Burst: Collapse: Structural Conductor 80 20" 35-115 35-115 1530 520 Surface 2694 13-3/8" 34-2728 34-2728 4930 2670 Production 8378 9-5/8" 2360-10738 2360-9431 Scab Liner 9676 7" 33-9709 33-8545 7240 5410 Scab Liner 550 4-1/2" 9701-10251 8538-9014 Perforation Depth: Measured depth: 10154-10194 feet True vertical depth: 8930-8965 feet O tv,Ar.R 0 1 V l b GG 1 Tubing(size,grade,measured and true vertical depth) 4-1/2"12.64 13Cr8 28-9744 28-8575 Packers and SSSV(type,measured and 4-1/2"HES TNT Packer 9532 8390 true vertical depth) 12.Stimulation or cement squeeze summary: Intervals treated(measured): - Treatment descriptions including volumes used and final pressure: Cut and Pull 5-1/2",17#x 4-1/2",12.6#13Cr80 from 9644'.Cut and Pull 9-5/8",47#,JL95 from 2360'.Run 4-1/2",12.6#,13Cr80 scab liner from 9701'-10251',cement with 52.1 Bbls 1.17 yield(250 sx)Class'G'.Run 7",26#,L-80 scab liner from 33'-9709',cement with 390.1 Bbls 1.31 yield(1672 sx)Class'G'and 100 Bbls 1.16 yield(484 sx)Class'G'.Run 4-1/2",12.6#, 13Cr85 tubing to 974.4'.Perforate w/3-3/8"Gun Diameter,6spf from:10154'-10169'and 10179'-10194'. 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation: 0 0 0 320 0 Subsequent to operation: 0 0 0 0 0 14.Attachments:(required per 20 AAC 25.070.25.071,&25.283) 15.Well Class after work: Daily Report of Well Operations El Exploratory 0 Development II Service 0 Stratigraphic 0 Copies of Logs and Surveys Run 0 16.Well Status after work: Oil 0 Gas 0 WDSPL 0 Printed and Electronic Fracture Stimulation Data ❑ GSTOR ❑ WINJ 0 WAG 0 GINJ 0 SUSP 0 SPLUG 0 17.I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O.Exempt: 315-393 Contact Mclaughlin,Sean M Email Sean.McLaughlin@bp.com Printed Name Joe Lastuf Title Drilling Technologist Signature lYa() Phone +1 907 564 4091 Date 11/2M V Form 10-404 Revised 5/2015 VTL. LAG -(/b RBDMS uEC 0 1 2015 Submit Original Only 6!G/tG • • 01-13, Well History (Pre-Rig Workover) TIVITYA ***WELL SHUT IN ON ARRIVAL*** (E-LINE TUBING CUT) INITIAL T/I/O = 190/525/ 190 PSI RIH ELINE LOGGING TOOS & 5-1/2"JET CUTTER(MAXOD=4.16")-TAGGED RBP PLUG @ 9575' CORRECTED MD THAT WAS SET BY SLICKLINE ON 4/1/14(SL DEPTH WAS 9549') CUT TUBING @ 9566' MD (GOOD INDICATION OF CUT WITH PRESSURE CHANGES ON TBG/ IA) - TIED IN TBG TALLY DATED 4/1/1999 WELL SHUT IN ON DEPARTURE- NOTIFIED PAD OP OF WELL STATUS FINAL T/I/O = 160/ 150/ 190 PSI 8/6/2015 ***JOB COMPLETE*** T/I/O = 130/130/170. Temp = SI. Install secondary containment. (Assist FB). AL spool dropped. Pulled cellar grating & installed 27" secondary containment. Re- installed cellar grating. Final WHPs = 130/130/170. 8/8/2015 LRS in control of well on departure. 14:30 T/I/O = SSV/150/160, Temp: SI, PPPOT-T (PASS) PPPOT-IC (PASS) Pre RWO PPPOT-T: Stung into test void, (0+ psi) bled void to 0 psi. Monitored for 10 minutes, void stayed at 0 psi. Functioned LDS, all moved freely. Torqued to 500 ft/lbs. Pumped through void, good returns. Pressured test void to 5,000 psi for 30 minute test. Lost 50 psi in 15 minutes, lost 0 psi in second 15 minutes. (PASS) Bled void to 0 psi. Stung into lower test port(0+ psi) to test bottom of primary seal and control line blanks. Bled void to 0 psi. Monitored for 10 minutes, void stayed at 0 psi. Pumped through void, good returns. Pressured void to 5,000 psi for 30 minute test. Lost 100 psi in 15 minutes, lost 50 psi in second 15 minutes. (PASS) Bled void to 0 psi. PPPOT-IC: Stung into test void, (100 psi) bled void to 0 psi. Monitored for 10 minutes, void stayed at 0 psi. Functioned LDS, all moved freely. Torqued to 500 ft/lbs. Pumped through void, good returns. Pressured test void to 3,500 psi for 30 minute test. Lost 100 8/8/2015 psi in 15 minutes, lost 50 psi in second 15 minutes. (PASS) Bled void to 0 psi. T/I/0=130/130/165 SI Circ Out well with KCL (RWO EXPENSE) Pumped 16.7 bbls DSL down TBG, established LLR of .5 bpm @ 1200 psi. WSL notified. Pumped 2 bbls meth followed by 720 bbls KCL, 170 bbls DSL down TBG taking returns up IA to 01-12 FL. U-tubed DSL TxIA for 1 hr, 60 bbls on TBG/110 bbls on IA. WSL/DSO notified Valve postions=SV WV SSV closed MV open CVs OTG ROS/Hardline SI 01-12 8/8/2015 turned over to DSO. FWHP=339/347/150 T/I/O = 356/337/165. Temp=SI. CMIT-TxIA FAILED to 2500 psi. AL spool is dropped. Used 4 bbls of diesel to pressure TxIA to 414 psi. Obtained LLR of 5.16 gpm @ 410 8/14/2015 psi. Bled TBG & IA to 302/305 psi. ***Continued on 8/15/15 AWGRS*** ***Continued from 8/14/15 AWGRS*** T/I/O = 302/305/165. Continued to bleed TP & IAP. TP& IAP increased during bleed to 333/343 w/7.6 bbls of returns, BT 50%full. Monitor during RD. TP increased 7 psi, IAP increased 2 psi. Job complete. Final W H Ps=340/345/165. 8/15/2015 SV,SSV=Closed. WV=LOTO. IA,OA=OTG. (0300 hrs) 8/15/2015 ***Continued from 8/14/15 AWGRS*** T/I/O = 340/350/170. Temp =SI. T, IA& OA FL (APE). AL disconnected. T & IA FL @ surface, OA FL @ 432' (26 Bbls). 8/27/2015 SV, WV ,SSV =C. MV=0. IA, OA=OTG. 04:45. T/I/0=340/340/0. Pre Doyon 16. Set 5" "K" BPV#604 at 120", Removed 5x7 upper tree and installed temp#53 as dryhole SV. PT tree cap to 500 psi. Final WHP's BPV/340/0. 9/6/2015 ***Job Incomplete***See log. • • 01-13, Well History (Pre-Rig Workover) T/I/O=BPV/340/120. Pre Doyon 16. PT Dryhole tree to 5000 psi, Install temp#90 on IA piggyback, Set 3"VR plug and remove front side IA valve. Final WHP's BPV/340/0. 9/7/2015 ***Job Incomplete***See log. T/I/O=BPV/340/120. Pre Doyon 16. Set 3" FMC VR plug in OA and replaced 3 1/8" OA valve with tag 23, Pulled 3" FMC VR plug, Installed 2" 1502 90 and block valve. Final 9/7/2015 WHP's BPV/340/120 T/I/O = bpv/325/170. Temp=Sl. Bleed WHPs to 0 psi (Pre RIG). No AL, FL, WV, SSV, scaffold, or well house (Dryhole tree installed). IA FL @ surface. Bled IAP, to BT, from 325 psi to 295 psi in 3 hrs, w/ 14 bbls returned (BT 50%full). Monitor during RD. IAP unchanged. Job incomplete. Final WHPs=BPV/295/170. SV=?. MV=Open. IA,OA=OTG. NOVP. (1700 hrs) 9/8/2015 T/I/O = BVP/295/170. Temp =SI. WHPs (Post bleed). No AL, FL, WV, SSV, scaffolding or wellhouse. IA and OA FLs @ surface. No increase in pressures. 9/9/2015 SV, MV= C. IA, OA=OTG. NOVP. 2045 hrs. T/I/O= BPV/300/140 Pre Doyon 16. RD hardline on OA- RU tapped blind flange and jewerly. PT'ed 300/2500psi 5min ea = PASSED. FWP= BPV/300/140 Job Complete- 9/12/2015 See log for details • North America-ALASKA-BP Page 1 of 29 Operation Summary Report Common Well Name:01-13 AFE No Event Type:WORKOVER(WO) Start Date:9/23/2015 End Date:10/17/2015 X4011 FV-E:(4,200,000.00) Project:Prudhoe Bay Site:PB DS 01 Rig Name/No.:DOYON 16 Spud Date/me:12/5/1977 12:00:00AM Rig Release:10/17/2015 Rig Contractor:DOYON DRILLING INC. UW:500292027000 Active datum:01-13 OKB Q73.00usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 9/23/2015 08:00 - 00:00 16.00 MOB P PRE RDMO WELL,PAD OPERATOR NOTIFIED,WSL AND TOOLPUSHER PRESENT FOR PULLING OFF WELL. -PULL RIG TO EDGE OF PAD. -PULL OFF PAD AND BEGIN MOVING RIG DOWN SPINE ROAD. -MOVE RIG DOWN SPINE ROAD ONTO K-PAD ACCESS ROAD. -MOVE RIG FROM K-PAD ACCESS ROAD ONTO WEST DOCK ROAD. 9/24/2015 00:00 - 05:00 5.00 MOB P PRE MOVE RIG FROM WEST DOCK ROAD DOWN TO DS-01 ACCESS ROAD. -MOVE RIG FROM DS-01 ACCESS ROAD ONTO DS-01. 05:00 - 08:00 3.00 MOB P PRE PJSM.REMOVE AUXILIARY WHEELS. -SPOT RIG ON PAD. 08:00 - 08:30 0.50 MOB N WAIT PRE WAIT ON RIG MATS. 08:30 - 10:30 2.00 MOB P PRE MOVE RIG AROUND TO BACK SIDE OF PAD. -INSTALL BOPE AND SECURE TO PEDESTAL. 10:30 - 12:00 1.50 MOB P PRE PJSM.SPOT RIG OVER 01-13. -PAD OPERATOR NOTIFIED. -WSL AND TOOLPUSHER PRESENT FOR PULLING OVER WELL. -SHIM AND CENTER RIG OVER WELL. -IA=300 PSI,OA=150 PSI. 12:00 - 16:00 4.00 MOB P PRE PJSM.RAISE AND PIN DERRICK. -BRIDLE DOWN. -R/U FLOOR EQUIPMENT AND SPOT SLOP TANK. -SPOT FUEL TRAILER AND CREW TRAILER. -R/U LINES IN CELLAR TO FLOW BACK TANK. -R/U KILL MANIFOLD IN CELLAR. 16:00 - 21:00 5.00 RIGU P DECOMP TAKE ON 9.8 PPG BRINE IN PITS. -ACCEPT RIG AT 16:00 HRS ON 09/24/2015. -PRESSURE TEST SURFACE LINES TO 250 PSI LOW,3,500 PSI HIGH FOR(5)CHARTED MINUTES.GOOD TEST. 21:00 - 21:30 0.50 RIGU P DECOMP RIG H2S EVACUATION DRILL AND AAR. 121:30 - 23:30 2.00 WHSUR P DECOMP PJSM.PRESSURE TEST DSM LUBRICATOR. -P/U LUBRICATOR AND TEST TO 250 PSI LOW,3,500 PSI HIGH FOR(5)CHARTED MINUTES.GOOD TEST. 23:30 - 00:00 0.50 WHSUR N WAIT DECOMP WAIT ON EXTENSION FOR DSM LUBRICATOR. COULD NOT PULL BPV PAST SWAB VALVE. 9/25/2015 00:00 - 02:00 2.00 WHSUR P DECOMP PTSM.PERFORM SPCC AND EQUIPMENT CHECKS. -CHECK CROWN-O-MATIC.OK. PJSM.PULL BPV WITH TESTED LUBRICATOR. -PULL BPV. -L/D LUBRICATOR. -TBG=300 PSI,IA=250 PSI,OA=150 PSI. Printed 11/11/2015 4:07:38PM • . North America-ALASKA-BP Page 2 of 29 Operation Summary Report Common Well Name:01-13 AFE No Event Type:WORKOVER(WO) Start Date:9/23/2015 End Date:10/17/2015 X4-011FV-E:(4,200,000.00) Project:Prudhoe Bay Site:PB DS 01 Rig Name/No.:DOYON 16 Spud Date/Time:12/5/1977 12:00:00AM Rig Release:10/17/2015 Rig Contractor:DOYON DRILLING INC. UWI:500292027000 Active datum:01-13 OKB @73.00usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 02:00 - 07:00 5.00 KILLW P DECOMP PJSM.CIRCULATE WELL WITH HEATED 9.8 PPG BRINE. -LINE UP TO PUMP DOWN IA TAKING RETURNS UP THE TUBING TO THE FLOW BACK TANK. -CIRCULATE AT 7 BPM=1,350 PSI DOWN IA TAKING DIESEL RETURNS TO THE FLOW BACK TANK. -CIRCULATE A TOTAL OF 78 BBLS DOWN IA UNTIL TUBING RETURNS ARE CLEAR OF DIESEL. -LINE UP TO PUMP DOWN TUBING TAKING RETURNS UP THE IA TO THE FLOW BACK TANK. -CIRCULATE AT 8 BPM=900-650 PSI DOWN THE TUBING TAKING RETURNS TO THE FLOW BACK TANK. -CIRCULATE A TOTAL 662 BBLS DOWN TUBING UNTIL RETURNS ARE CLEAR OF DIESEL. -SHUT DOWN AND MONITOR WELL FOR(10) MINUTES. -BLOW DOWN LINES,RIG UP 2ND KILL LINE FOR CONTINUOUS HOLE FILL ON I/A. 07:00 - 09:00 2.00 KILLW P DECOMP PJSM.DETERMINE STATIC LOSS RATE AT 30 BPH. -MIX UP AND PUMP HI VIS SWEEP,(40 BBLS OF 2#/BBL DUO VIS),DOWN TUBING. -PUMP PILL AND CHASE OUT AT CUT AT 9,566'MD AT 7 BPM=1300 PSI. -MONITOR WELL FOR(10)MINUTES.LOSS RATE=24 BPH. 09:00 - 11:00 2.00 WHSUR P DECOMP PJSM.RIG UP DRILL SITE MAINTENANCE LUBRICATOR.PRESSURE TEST LUBRICATOR. -SET BPV,RIG DOWN LUBRICATOR. -PERFORM ROLLING TEST BELOW BPV TO 500 PSI FOR(5)CHARTED MINUTES. -PUMPED AWAY(12)BBLS ON ROLLING TEST. 11:00 - 12:00 1.00 WHSUR P DECOMP PJSM.VERIFY CAMERON PROCEDURES AND LEVEL 1 DATA. -BLEED VOID,NIPPLE DOWN TREE AND ADAPTER.INSTALL DART IN BPV. -PUMP 40 BBLS HI VIS SWEEP EVERY 30 MINUTES IN(10)BBL INTERVALS DOWN I/A. LOSSES TO WELL BORE LAST(12)HOURS= 201 BBLS. O/A=150 PSI. NO SLOW CIRCULATING RATES ON THIS TOUR. 12:00 - 15:30 3.50 WHSUR P DECOMP PTSM.PERFORM SPCC AND EQUIPMENT CHECKS. -CHECK CROWN-O-MATIC.OK. PJSM.CONTINUE TO NIPPLE DOWN TREE AND ADAPTER FLANGE. -TOTAL OF(40)BBLS HI VIS SWEEP PUMPED DOWN THE I/A. -CHECK LOCK DOWN SCREWS ON HANGER, 3-3/16"IN, 3-7/8"OUT. Printed 11/11/2015 4:07:38PM • North America-ALASKA-BP Page 3 of 29 Operation Summary Report Common Well Name:01-13 AFE No Event Type:WORKOVER(WO) Start Date:9/23/2015 End Date:10/17/2015 X4-011FV-E:(4,200,000.00) Project:Prudhoe Bay Site:PB DS 01 Rig Name/No.:DOYON 16 Spud Date/me:12/5/1977 12:00:00AM Rig Release:10/17/2015 Rig Contractor:DOYON DRILLING INC. UW1:500292027000 Active datum:01-13 OKB @73.00usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 15:30 - 19:00 3.50 BOPSUR P DECOMP PJSM.N/U FOUR PREVENTER 13-5/8"5M BOPE STACK. -CONFIGURATION TOP TO BOTTOM; -ANNULAR PREVENTER. -9-5/8"FIXED RAMS. -BLIND SHEAR RAMS. -MUD CROSS. -3-1/2"X 6"VARIABLE BORE RAMS. 19:00 - 20:30 1.50 BOPSUR P DECOMP R/U TEST EQUIPMENT ON RIG FLOOR. -FUNCTION TEST AND BODY TEST BOPE TO 250 PSI LOW,3,500 PSI HIGH.GOOD BODY TEST. 20:30 - 00:00 3.50 BOPSUR P DECOMP PJSM.TEST FOUR PREVENTER 13-5/8"5M BOPE AND RELATED EQUIPMENT. -TEST BOPE ACCORDING TO AOGCC REGULATIONS,DOYON AND BP PROCEDURES. -TEST ANNULAR WITH 4"TEST JOINT TO 250 PSI LOW,3,500 PSI HIGH FOR 5 CHARTED MINUTES. -TEST UPPER 9-5/8"FIXED RAMS WITH 9-5/8" TEST JOINT TO 250 PSI,3,500 PSI HIGH FOR 5 CHARTED MINUTES. -TEST LOWER 3-1/2"X 6"VARIABLE RAMS WITH 4"AND 5-1/2"TEST JOINT TO 250 PSI, 3,500 PSI HIGH FOR 5 CHARTED MINUTES. LOSSES TO WELL BORE LAST(24)HOURS= 435 BBLS. 0/A OPEN TO FLOW BACK TANK. NO SLOW CIRCULATING RATES ON THIS TOUR. 9/26/2015 00:00 - 03:00 3.00 BOPSUR P DECOMP PTSM.PERFORM SPCC AND EQUIPMENT CHECKS. PJSM.CONTINUE TO TEST FOUR PREVENTER 13-5/8"5M BOPE AND RELATED EQUIPMENT. -TEST BLIND RAMS,FLOOR VALVES,AND CHOKE MANIFOLD TO 250 PSI,3,500 PSI HIGH FOR 5 CHARTED MINUTES. -TEST WITH FRESH WATER. -PERFORM ACCUMULATOR DRAW DOWN TEST WITH WSL PRESENT. JEFF JONES OF AOGCC WAIVED WITNESS FOR BOPE TEST. 03:00 - 04:00 1.00 BOPSUR P DECOMP R/D TEST EQUIPMENT. -BLOW DOWN CHOKE AND KILL LINES. Printed 11/11/2015 4:07:38PM • • North America-ALASKA-BP Page 4 of 29 Operation Summary Report Common Well Name:01-13 AFE No Event Type:WORKOVER(WO) Start Date:9/23/2015 End Date:10/17/2015 X4-011 FV-E:(4,200,000.00) Project:Prudhoe Bay Site:PB DS 01 Rig Name/No.:DOYON 16 Spud Daterme:12/5/1977 12:00:00AM Rig Release:10/17/2015 Rig Contractor:DOYON DRILLING INC. UWI:500292027000 Active datum:01-13 OKB @73.00usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 04:00 - 07:00 3.00 BOPSUR P DECOMP PJSM.R/U TO PULL TEST DART AND TYPE K BPV. -R/U DUTCH RISER AND PRESSURE TEST LUBRICATOR TO 250 PSI LOW,3,500 PSI HIGH FOR(5)MINUTES.GOOD TEST. -SET BACK LUBRICATOR. -CAMERON PULL TEST DART WITH T-BAR. -R/U LUBRICATOR AND PRESSURE TEST QUICK TEST SUB TO 250 PSI LOW,3,500 PSI HIGH.GOOD TEST. -PULL TYPE K BPV WITH TESTED LUBRICATOR. -L/D LUBRICATOR. -L/D DUTCH RISER. 07:00 - 08:00 1.00 PULL P DECOMP R/U BAILS AND POWER TONGS. -M/U SAFETY JOINT TO 5-1/2"NSCC CROSSOVER. -R/U 5-1/2"CASING EQUIPMENT ON RIG FLOOR. 08:00 - 08:30 0.50 PULL P DECOMP PJSM.M/U BAKER SPEAR BHA#1. -RIH AND SPEAR 5-1/2"TUBING BELOW HANGER. 08:30 - 09:30 1.00 PULL P DECOMP PULL HANGER FREE. -CAMERON BOLDS. -PULL HANGER FREE AT 190 KLBS. -PULL HANGER TO RIG FLOOR.PUW=177 KLBS. 09:30 - 10:00 0.50 PULL P DECOMP L/D BAKER SPEAR BHA#1. -RELEASE SPEAR AND L/D SPEAR LANDING JOINT. 10:00 - 11:00 1.00 PULL P DECOMP L/D HANGER AND M/U SAFETY JOINT TO 5-1/2"TUBING. 11:00 - 12:00 1.00 PULL P DECOMP PJSM.CIRCULATE BOTTOMS UP. -PUMP AT 6 BPM=340 PSI TAKING RETURNS THROUGH GAS BUSTER. LOSSES TO WELL BORE LAST(12)HOURS= 116 BBLS. O/A=180 PSI.OPENING UP OA TO FLOW BACK TANK EVERY(3)HOURS. NO SLOW CIRCULATING RATES ON THIS TOUR. 12:00 - 13:00 1.00 PULL P DECOMP PTSM.PERFORM SPCC AND EQUIPMENT CHECKS. -CHECK CROWN-O-MATIC.OK. PJSM.CONTINUE CIRCULATE BOTTOMS UP. -PUMP AT 6 BPM=330 PSI TAKING RETURNS THROUGH GAS BUSTER. 13:00 - 13:30 0.50 PULL P DECOMP BREAK AND L/D HEAD PIN. -BLOW DOWN GAS BUSTER AND LINES. 13:30 - 00:00 10.50 PULL P DECOMP PJSM.POOH WITH 5-1/2"17#13CR NSCC TUBING. -POOH FROM 9,538'MD TO 1,530'MD. LOSSES TO WELL BORE LAST(24)HOURS= 229 BBLS. 0/A OPEN TO FLOW BACK TANK. NO SLOW CIRCULATING RATES ON THIS TOUR. Printed 11/11/2015 4:07:38PM 41111 • North America-ALASKA-BP Page 5 of 29 Operation Summary Report Common Well Name:01-13 AFE No Event Type:WORKOVER(WO) Start Date:9/23/2015 End Date:10/17/2015 X4011 FV-E:(4,200,000.00) Project:Prudhoe Bay Site:PB DS 01 Rig Name/No.:DOYON 16 Spud Date/Time:12/5/1977 12:00:00AM Rig Release:10/17/2015 Rig Contractor:DOYON DRILLING INC. UWI:500292027000 Active datum:01-13 OKB(g73.00usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 9/27/2015 00:00 - 00:30 0.50 PULL P DECOMP PTSM.PERFORM SPCC AND EQUIPMENT CHECKS. -CHECK CROWN-O-MATIC.OK. -0/A=130 PSI AT 00:00 HRS,BLED TO 0 PSI, (GAS). 00:30 - 02:30 2.00 PULL P DECOMP PJSM.POOH WITH 5-1/2"17#13CR NSCC TUBING. -POOH FROM 1,530'MD TO SURFACE. -RECOVERED:(228)FULL JOINTS,(4)GLMS, (1)X NIPPLE,(1)CUT JOINT=30.72'MD WITH 6-3/16"FLAIR. 02:30 - 03:30 1.00 PULL P DECOMP CLEAR AND CLEAN RIG FLOOR. -R/D POWER TONGS. -R/D TUBING EQUIPMENT AND CLEAR RIG FLOOR. 03:30 - 05:00 1.50 BOPSUR P DECOMP M/U WEAR RING RUNNING TOOL. -INSTALL WEAR RING,UNABLE TO RILDS, WEAR BUSHING NOT SEATING PROPERLY. -PULL WEAR RING,OPT TO LEAVE IT OUT AS WE ARE GOING TO CHANGE OUT TUBING SPOOL LATER ON. -MOBILIZE BAKER PACKER MILLING BHA TO PIPE SHED AND RIG FLOOR. 05:00 - 08:00 3.00 CLEAN P DECOMP PJSM.M/U BAKER PACKER MILL BHA#2. -MONITOR WELL WHILE OUT OF HOLE.12 BPH LOSS RATE,9.8 PPG BRINE IN AND OUT. -RIH FROM SURFACE TO 271'MD. -O/A=60 PSI AT 06:00 HRS,BLED TO 0 PSI, (GAS). 08:00 - 12:00 4.00 CLEAN P DECOMP PJSM.RIH WITH BAKER PACKER MILL BHA#2. -PICK UP 4"DRILL PIPE FROM PIPE SHED AND RIH IXI. -RIH FROM 271'MD TO 3,050'MD.PUW=90 KLBS,SOW=94 KLBS,ALL WT CHECKS INCLUDE 40 KLBS TOP DRIVE. FLUID LOSSES TO WELL BORE LAST(12)HRS =107 BBLS OF 9.8 PPG BRINE. -O/A=70 PSI AT 12:00 HRS,BLED TO 0 PSI, (GAS). 12:00 - 12:30 0.50 CLEAN P DECOMP PERFORM SPCC CHECKS,CROWN 0 MATIC, OK. -INSPECT AND SERVICE RIG FLOOR EQUIPMENT AND PIPE SKATE. 12:30 - 21:00 8.50 CLEAN P DECOMP PJSM.RIH WITH BAKER PACKER MILL BHA#2. -PICK UP 4"DRILL PIPE FROM PIPE SHED AND RIH IXI. -RIH FROM 3,050'MD TO 9,538'MD.PUW= 175 KLBS,SOW=160 KLBS,ALL WT CHECKS INCLUDE 40 KLBS TOP DRIVE. -CONTINUE RIH AND TAG PACKER AT 9,585' MD. -0/A=60 PSI AT 18:00 HRS,BLED TO 0 PSI, (GAS). Printed 11/11/2015 4:07:38PM • • North America-ALASKA-BP Page 6 of 29 Operation Summary Report Common Well Name:01-13 AFE No Event Type:WORKOVER(WO) Start Date:9/23/2015 End Date:10/17/2015 X4-011 FV-E:(4,200,000.00) Project:Prudhoe Bay Site:PB DS 01 Rig Name/No.:DOYON 16 Spud Date/Time:12/5/1977 12:00:00AM Rig Release:10/17/2015 Rig Contractor:DOYON DRILLING INC. UWI:500292027000 Active datum:01-13 OKB @73.Oousft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 21:00 - 00:00 3.00 CLEAN P DECOMP PJSM.MILL BAKER S-3 PACKER. -ESTABLISH PARAMETERS:RPM=80,PUMP AT 6 BPM=580 PSI,WOB=5-10 KLBS,ROT. WT.=165 KLBS,FREE TORQUE=4 FT-KLBS. -ACQUIRE SLOW CIRCULATING RATES. -MILL ON PACKER AS PER BAKER REPRESENTATIVE. FLUID LOSSES TO WELL BORE LAST(24)HRS =187 BBLS OF 9.8 PPG BRINE. -0/A=75 PSI AT 00:00 HRS,BLED TO 0 PSI, (GAS). 9/28/2015 00:00 - 00:30 0.50 CLEAN P DECOMP PTSM.PERFORM SPCC AND EQUIPMENT CHECKS. -CHECK CROWN-O-MATIC.OK. PJSM.MILL BAKER S-3 PACKER. -ESTABLISH PARAMETERS:RPM=80,PUMP AT 7.7 BPM=590 PSI,WOB=15 KLBS,ROT. WV.=165 KLBS,FREE TORQUE=5-7 FT-KLBS. -MILL ON PACKER AS PER BAKER REPRESENTATIVE,PACKER FELL OFF AND WELL WENT ON A VACUUM.LOSS RATE=160 BPH. 00:30 - 03:00 2.50 CLEAN P DECOMP CLOSE ANNULAR AND BULLHEAD 70 BBLS 9.8 PPG BRINE AT 8 BPM=350 PSI DOWN TUBING. -OPEN ANNULAR,WELL ON A STRONG VACUUM. -SPOT 40 BBL HI-VIS 9.8 PPG BRINE PILL DOWN DRILL STRING.FILL IA,NO FLUID AT SURFACE. -SPOT ANOTHER 40 BBL HI-VIS 9.8 PPG BRINE PILL DOWN DRILL STRING.FILL IA,NO FLUID AT SURFACE AFTER PUMPING 130 BBLS 9.8 PPG BRINE. -CALL ODE TO DISCUSS OPTIONS.FILL IAAT 80 BPH. -CALL OUT 290 BBLS 9.8 PPG 50,000 LSRV. CONTINUE FILLING IAAT 80 BPH. 03:00 - 09:30 6.50 CLEAN N DPRB DECOMP CALL FOR 2ND TRUCK LOAD OF VISCOSIFIED 9.8 PPG BRINE. -CONTINUE TO FILL HOLE AT 80 BPH,NO RETURNS. Printed 11/11/2015 4:07:38PM • • North America-ALASKA-BP Page 7 of 29 Operation Summary Report Common Well Name:01-13 AFE No Event Type:WORKOVER(WO) Start Date:9/23/2015 End Date:10/17/2015 X4-011 FV-E:(4,200,000.00) Project:Prudhoe Bay Site:PB DS 01 Rig Name/No.:DOYON 16 Spud Date/Time:12/5/1977 12:00:00AM Rig Release:10/17/2015 Rig Contractor:DOYON DRILLING INC. UWI:500292027000 Active datum:01-13 OKB @73.00usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 09:30 - 12:00 2.50 CLEAN P DECOMP PJSM.LINE UP AND PUMP 9.8 VISCOSIFIED BRINE,(60,000 LSRV),DOWN DRILL PIPE. -PUMP @ 5 BPM/ICP=40 PSI,FCP=345 PSI,NO RETURNS WHILE PUMPING THIS LOAD. -LINE UP 2ND TRUCK.KICK ON HOLE FILL, HOLE FULL AFTER 20 BBLS. -ESTABLISH STATIC LOSS RATE OF 123 BPH. -LINE UP AND BEGIN PUMPING 2ND 290 BBLS OF VISCOSIFIED 9.8 PPG BRINE,(80,000 LSRV). -LOSSES TO WELL BORE LAST(12)HOURS= 1,666 BBLS OF 9.8 PPG BRINE. -0/A=75 PSI AT 00:00 HRS,BLED TO 0 PSI, (GAS). -0/A=85 PSI AT 06:00 HRS,BLED TO 0 PSI, (GAS). 12:00 - 13:00 1.00 CLEAN P DECOMP PJSM.CONTINUE PUMPING 2ND LOAD OF VISCOSIFIED BRINE. -INITIAL PUMP RATE OF 3 BPM/450 PSI AFTER PUMPING 100 BBLS. -BRING RATE UP TO 5 BPM/630 PSI FOR LAST 190 BBLS. -DISPLACE W/9.8 UNVISCOSIFIED BRINE,(65 BBLS),5 BPM/640 PSI. 13:00 - 13:30 0.50 CLEAN P DECOMP MONITOR WELL.ESTABLISH STATIC LOSS RATE OF 21 BPH. 9.8 PPG BRINE IN AND OUT. 13:30 - 15:00 1.50 CLEAN P DECOMP PJSM.RIH W/SINGLES TO TAG AND PUSH PACKER DOWN HOLE. -PUSH PACKER&TAIL PIPE F/9585'-10,134'. (TOP OF PACKER AT 10,109'DPM.(AREA OF BAD 9-5/6"CASING). 15:00 - 20:00 5.00 CLEAN P DECOMP PJSM.POOH WITH BAKER PACKER MILL BHA #2. -POOH FROM 10,134'MD TO 365'MD. -MONITOR WELL FOR(10)MINUTES.LOSS RATE=21 BPH,9.8 PPG DUO VIS BRINE. 20:00 - 23:00 3.00 CLEAN P DECOMP PJSM.UD BAKER PACKER MILL BHA#2. -POOH FROM 365'MD TO SURFACE. -RECOVERED:20 LBS METAL AND CEMENT IN BOOT BASKETS. 23:00 - 00:00 1.00 CLEAN P DECOMP CLEAR AND CLEAN RIG FLOOR OF BRINE. -LOSSES TO WELL BORE LAST(24)HOURS= 2,124 BBLS OF 9.8 PPG BRINE. -O/A=100 PSI AT 12:00 HRS,BLED TO 0 PSI, (GAS). -0/A=80 PSI AT 00:00 HRS,BLED TO 0 PSI, (GAS). 9/29/2015 00:00 - 00:30 0.50 CLEAN P DECOMP PTSM.PERFORM SPCC AND EQUIPMENT CHECKS. -CHECK CROWN-O-MATIC.OK. 00:30 - 01:30 1.00 FISH P DECOMP PJSM.M/U BAKER SPEAR BHA#3. -MONITOR WELL,LOSS RATE=22 BPH,9.8 PPG DUO-VIS BRINE. -RIH FROM SURFACE TO 220'MD. 01:30 - 06:00 4.50 FISH P DECOMP RIH WITH BAKER SPEAR BHA#3. -RIH FROM 220'MD TO 9500"MD. Printed 11/11/2015 4:07:38PM • • North America-ALASKA-BP Page 6 of 29 Operation Summary Report Common Well Name:01-13 AFE No Event Type:WORKOVER(WO) Start Date:9/23/2015 End Date:10/17/2015 X4-011 FV-E:(4,200,000.00) Project:Prudhoe Bay Site:PB DS 01 Rig Name/No.:DOYON 16 Spud Date/Time:12/5/1977 12:00:00AM Rig Release:10/17/2015 Rig Contractor:DOYON DRILLING INC. UW:500292027000 Active datum:01-13 OKB @73.00usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 06:00 - 08:00 2.00 FISH P DECOMP PJSM.SLIP AND CUT DRILLING LINE. -SLIP AND CUT 81'OF DRILLING LINE,CHECK CROWN 0 MATIC,OK. -MONITOR WELL,STATIC LOSS RATE=22 BPH,9.8 PPG BRINE IN AND OUT. -INSPECT SAVER SUB,OK. 08:00 - 10:00 2.00 FISH P DECOMP PJSM.CONTINUE TO RIH W/4"DRILL PIPE F/ 9500'. -ESTABLISH PARAMETERS:UP WT=184K, DOWN Wl=160K. -ACQUIRE SLOW PUMP RATES:MP1=30 SPM/130 PSI,40 SPM/200 PSI. -MP2=30 SPM/170 PSI,40 SPM/270 PSI. WASH DOWN @ 4 BPM/260 PSI. -WASH DOWN F/10,076'-10,117',NO GO OUT.STACK 10K ON FISH.SEE 20 PSI PRESSURE INCREASE. -PICK UP 15',SHUT DOWN PUMP AND RBIH AND STACK OUT 15K. 10:00 - 12:00 2.00 FISH P DECOMP PJSM.MONITOR WELL,LOSS RATE=22 BPH, 9.8 PPG BRINE IN AND OUT. -BLOW DOWN TOP DRIVE AND POOH,UP WT =187K OFF BOTTOM. -POOH F/10,117'-9034'.UP WT=175K. -FLUID LOSSES LAST 12 HRS=202 BBLS OF 9.8 PPG BRINE. -0/A=90 PSI @ 00:00 HRS,BLED TO 0 PSI (GAS). -O/A=100 PSI @ 06:30 HRS,BLED TO 0 PSI (GAS). 12:00 - 12:30 0.50 FISH P DECOMP SERVICE RIG AND INSPECT EQUIPMENT. -PERFORM SPCC CHECKS AND CROWN 0 MATIC,OK. 12:30 - 18:00 5.50 FISH P DECOMP PJSM.CONTINUE TO POOH W/4"DRILL PIPE AND FISHING BHA F/9034'MD T/314'MD -B/D T/D,MONITOR WELL F/10MINS(20BPH LOSS RATE),8.5PPG MW IN AND OUT -RACK BACK STANDS IN DERRICK 18:00 - 22:00 4.00 FISH P DECOMP L/D BAKER FISHING SPEAR BHA#3 -MONITOR WELL F/10 MINS PRIOR T/ PULLING BHA THROUGH STACK,20BPH LOSS RATE,8.5PPG MW IN AND OUT -PUNCH HOLE 2'ABOVE THE PKR IN ORDER T/ENSURE ANY TRAPPED PRESSURE IS BLED OFF -L/D SPEAR,10.00'5-1/2"CUT JNT,9.65'5-1/2" PUP,BAKER S-3 PKR,AND ALL ASSOCIATED TAIL PIPE EQUIPMENT(TOTAL FISH=77.22') 22:00 - 23:30 1.50 FISH P DECOMP R/D POWER TONGS AND TBG EQUIPMENT, CLEAN AND CLEAR RIG FLOOR 23:30 - 00:00 0.50 FISH P DECOMP STAGE BAKER CLEAN OUT BHA#4 ON RIG FLOOR FLUID LOSSES LAST 12 HRS=101 BBLS -O/A=80 PSI @ 12:00 HRS,BLED TO 0 PSI (GAS). -0/A=110 PSI @ 18:00 HRS,BLED TO 0 PSI (GAS). -9.8PPG MW IN AND OUT NO SPR THIS TOUR Printed 11/11/2015 4:07:38PM • • North America-ALASKA-BP Page 9 of 29 Operation Summary Report Common Well Name:01-13 AFE No Event Type:WORKOVER(WO) Start Date:9/23/2015 End Date:10/17/2015 X4-011FV-E:(4,200,000.00) Project:Prudhoe Bay Site:PB DS 01 Rig Name/No.:DOYON 16 Spud Date/Time:12/5/1977 12:00:00AM Rig Release:10/17/2015 Rig Contractor:DOYON DRILLING INC. UWI:500292027000 Active datum:01-13 OKB @73.00usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 9/30/2015 00:00 - 00:30 0.50 FISH P DECOMP SERVICE AND INSPECT RIG FLOOR EQUIPMENT 00:30 - 02:30 2.00 FISH P DECOMP PJSM.M/U BAKER FISHING CLEANOUT BHA# 4 AND RIH F/SURFACE T/256'MD -MONITOR WELL F/10 MINS,8BPH LOSSES, 9.8PPG IN AND OUT 02:30 - 06:30 4.00 FISH P DECOMP CONTINUE T/RIH W/DP ON STANDS OUT OF DERRICK F/256'MD. -RIH TO 10,110'.UP WT=190K,DOWN WT= 163K,ROTATING WT=175K.60 RPM/5K FT/LBS FREE SPIN TORQUE. -ALL WT CHECKS INCLUDE 40K TOP DRIVE. 06:30 - 09:00 2.50 FISH P DECOMP PJSM.ACQUIRE SLOW PUMP RATES. -MP1=30 SPM/150 PSI,40 SPM/190 PSI. MP2=30 SPM/175 PSI,40 SPM 260 PSI. -RIH,TAG @ 10,135'-10,137'W/6 3/4"MILL. WORK THRU W/O ROTATING.,3K WOB. -RIH AND TAG W/8 1/2"MILL @ 10,135,SET DOWN 5K PICK UP AND REAM THRU TIGHT AREA. -REAM THRU TIGHT SPOT,PUMPING 8 BPM/ 740 PSI W/60 RPM,5-6.5K FT/LBS TORQUE. -1-2K WOB,REAM 5X TO 10,176'BULL NOSE DEPTH,10,150'8 1/2"STRING MILL DEPTH. -PASS THRU WITHOUT ROTATING OR PUMPING,NO BOBBLES. 09:00 - 10:00 1.00 FISH P DECOMP PJSM.PUMP(1)DRILL PIPE VOLUME OF UNVISCOSIFIED 9.8 PPG BRINE TO AID IN TRIPPING DRY. -MONITOR WELL,6 BPH LOSS RATE,9.8 PPG BRINE IN AND OUT. 10:00 - 12:00 2.00 FISH P DECOMP PJSM.POOH W/CLEANOUT BHA ON 4"HT38 DRILL PIPE TO 7553'. -FLUID LOSSES TO WELL LAST(12)HRS=99 BBLS OF 9.8 PPG BRINE. -0/A=80 PSI @ 00:00 HRS,BLEED TO 0 PSI, (GAS) -O/A=110 PSI @ 06:15 HRS,BLED TO 0 PSI, (GAS). 12:00 - 12:30 0.50 FISH P DECOMP SERVICE AND INSPECT RIG FLOOR EQUIPMENT 12:30 - 16:00 3.50 FISH P DECOMP CONTINUE T/POOH W/BAKER FISHING BHA #4 F/7553'MD T/350'MD 16:00 - 18:00 2.00 FISH P DECOMP L/D BAKER FISHING BHA#4 -MONITOR WELL PRIOR T/PULLING AND AFTER PULLING BHA THROUGH STACK F/ 10MINS(6BPH LOSS RATE)MW=9.8PPG IN AND OUT -1/2 GALLON OF METAL SHAVINGS AND RUBBER RECOVERED IN BOOT BASKETS -CLEAN AND CLEAR RIG FLOOR 18:00 - 20:00 2.00 FISH P DECOMP P/U AND M/U BAKER FISHING CUT LIP BASKET BHA#5 -UTILIZE 30'OF WASH PIPE Printed 11/11/2015 4:07:38PM • I North America-ALASKA-BP Page 10 of 29 Operation Summary Report Common Well Name:01-13 AFE No Event Type:WORKOVER(WO) Start Date:9/23/2015 End Date:10/17/2015 X4-011 FV-E:(4,200,000.00) Project:Prudhoe Bay Site:PB DS 01 Rig Name/No.:DOYON 16 Spud Date/me:12/5/1977 12:00:00AM Rig Release:10/17/2015 Rig Contractor DOYON DRILLING INC. UWWI:500292027000 Active datum:01-13 OKB @73.00usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 20:00 - 00:00 4.00 FISH P DECOMP CONTINUE T/RIH W/BAKER FISHING CUT LIP BASKET BHA#5 ON DP OUT OF DERRICK F/ 350'MD FLUID LOSSES TO WELL LAST(12)HRS=50 BBLS OF 9.8 PPG BRINE. -0/A=90 PSI @ 00:00 HRS,BLEED TO 0 PSI, (GAS) -0/A=100 PSI @ 06:15 HRS,BLED TO 0 PSI, (GAS). 10/1/2015 00:00 - 00:30 0.50 FISH P DECOMP SERVICE AND INSPECT RIG FLOOR EQUIPMENT 00:30 - 02:00 1.50 FISH P DECOMP CONTINUE T/RIH W/BAKER FISHING BHA#4 F/7639'MD T/10138'MD 02:00 - 03:00 1.00 FISH P DECOMP WASH DOWN @ 7-BPM OVER FISH -GAIN FISHING PARAMETERS,PUW= 194KLBS,SOW=159KLBS,ROT WT= 175KLBS @ 20RPM W/4K FREE TQ -WASH DOWN @ 7BPM W/550PSI -BEGIN TAKING WEIGHT @ 10175'MD,P/U 5' ROTATE @ 2RPM PAST OBSTRUCTION,TURN OFF ROTARY AND CONTINUE DOWN T/HARD TAG @ 10186'MD -P/U AND ATTEMPT T/ROTATE PAST 10186'MD W/NO SUCCESS -WASH DOWN @ 10BPM,900PSI AND TAG @ 10186'MD 03:00 - 09:00 6.00 FISH P DECOMP POOH W/BAKER FISHING CUT LIP GUIDE BHA#4 -FLOW CHECK WELL F/10 MINS,(6BPH LOSS RATE)9.8PPG MW IN AND OUT -MONITOR WELL AT BHA,12 BPH STATIC LOSS RATE,9.8 PPG BRINE IN AND OUT. 09:00 - 12:00 3.00 FISH P DECOMP PJSM.LAY DOWN INTESIFIERS,RACK BACK DRILL COLLARS. -PULL BHA TO SURFACE,BREAK OUT CUT LIP GUIDE SHOE. -REMOVE RECOVERED SLICK LINE TOOLS F/ WASH PIPE. -RECOVERED 30.10'SLICK LINE TOOL STRING AND(2)CUTTER BARS,4.9'EACH, TOTAL LENGTH=39.90'. -CLEAN AND CLEAR RIG FLOOR. -0/A=90 PSI @ 00:00 HRS.BLED TO 0 PSI (GAS) -0/A=95 PSI @ 06:00 HRS,BLED TO 0 PSI (GAS). LOSSES T/WELLBORE @ NOON=76BBLS W/ 9.8PPG MW IN AND OUT 12:00 - 12:30 0.50 FISH P DECOMP SERVICE AND INSPECT RIG FLOOR EQUIPMENT 12:30 - 15:00 2.50 CLEAN P DECOMP P/U AND M/U BAKER FISHING MILLING BHA#6 15:00 - 18:30 3.50 CLEAN P DECOMP RIH W/BAKER FISHING MILLING BHA#6 F/ 262'MD T/10120'MD 18:30 - 21:00 2.50 CLEAN P DECOMP SLIP AND CUT 74'OF DRILL LINE,INSPECT AND BRAKES AND SAVER SUB(GOOD) Printed 11/11/2015 4:07:38PM • North America-ALASKA-BP Page 11 of 29 Operation Summary Report Common Well Name:01-13 (AFE No Event Type:WORKOVER(WO) Start Date:9/23/2015 End Date:10/17/2015 X4-011 FV-E:(4,200,000.00) Project:Prudhoe Bay Site:PB DS 01 Rig Name/No.:DOYON 16 Spud Date/Time:12/5/1977 12:00:00AM Rig Release:10/17/2015 Rig Contractor:DOYON DRILLING INC. UWI:500292027000 Active datum:01-13 OKB @73.00usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 21:00 - 21:30 0.50 CLEAN P DECOMP P/U 2 DP SINGLES F/PIPE SHED AND CONTINUE TIH T/10183'MD -M/U TD ON STAND 106 AND GAIN MILLING PARAMETERS -PU W=195KLBS,SOW=159KLBS W/7BPM= 1160PSI -ROT @ 80 RPM W/5K FT-LBS FREE TQ,175K ROT WT 21:30 - 00:00 2.50 CLEAN P DECOMP TAG HARD BOTTOM @ 10186'MD,P/U,TURN ON ROTARY AND PUMPS AND BEGIN MILLING -ROT=90RPM,PUMP=7BPM @ 1140PSI, 8-10K FT-LBS TQ,5-7KLBS WOB -0/A=100 PSI @ 12:00 HRS.BLED TO 0 PSI (GAS) -0/A=100 PSI @ 18:00 HRS,BLED TO 0 PSI (GAS) LOSSES T/WELLBORE @ MIDNIGHT= 58BBLS W/9.8PPG MW IN AND OUT 10/2/2015 00:00 - 00:30 0.50 CLEAN P DECOMP SERVICE AND INSPECT RIG FLOOR EQUIPMENT 00:30 - 06:00 5.50 CLEAN P DECOMP CONTINUE T/MILL F/10196'MD -VARY MILLING PARAMETERS F/5-15K WOB, 4-10BPM,60-100RPM 06:00 - 12:00 6.00 CLEAN P DECOMP CONTINUE TO MILL CEMENT/JUNK W/7 BPM /1150 PSI,80-100 RPM,WOB=8-14K. -MILL TO 10,225',SLOW PUMP TO 4 BPM W/ 470 PSI.CONTINUE TO MILL TO 10,234' -STALL OUT W/15K FT/LBS TORQUE, RELEASE TORQUE,PICK UP AND OBSERVE 70K OVER PULL. -WORK FREE,WORK PIPE UP TO 10,105'AND BACK DOWN.10-15K DRAG.FREE TORQUE INCREASE TO 9K. -NOTIFY ODE OF DIFFICULTIED AND DETERMINE TARGET DEPTH OF 10,255'DPM. -CONTINUE TO MILL F/10,235'-10,240'W/80 -100 RPM,5-10 WOB AND 10-12K FT/LBS ON BOTTOM TORQUE. -VARY MILLING PARAMETERS INCLUDING A FEW SPUDS,INCREASING WOB TO 20K, SLOWING PUMP RATES. -AVERAGE ROP=1'/HR OR LESS.UNABLE TO INCREASE ROP.DECISION MADE TO PULL MILL AND CHECK IT OUT. -FLUID LOSSES TO WELL BORE LAST(12) HRS=88 BBLS. -O/A=95 PSI @ 00:00 HRS,BLED TO 0 PSI, (GAS). -O/A=90 PSI @ 06:00 HRS,BLED TO 0 PSI, (GAS). 12:00 - 14:00 2.00 CLEAN P DECOMP CIRCULATE 40BBL HI-VIS SWEEP @ 9BPM, 2100PSI SURFACE T/SURFACE -ROTATE AND RECIPROCATE @ 65 RPM 14:00 - 16:30 2.50 CLEAN P DECOMP PJSM.PUMP 125BBLS OF NON-VIS 9.8PPG BRINE AND MONITOR WELL,WELL U-TUBING. -PUMP DRY JOB AND U-TUBE STOPS, MONITOR WELL(6BPH LOSS RATE) Printed 11/11/2015 4:07:38PM • S North America-ALASKA-BP Page 12 of 29 Operation Summary Report Common Well Name:01-13 AFE No Event Type:WORKOVER(WO) Start Date:9/23/2015 End Date:10/17/2015 X4-011 FV-E:(4,200,000.00) Project:Prudhoe Bay Site:PB DS 01 Rig Name/No.:DOYON 16 Spud Date/Time:12/5/1977 12:00:00AM Rig Release:10/17/2015 Rig Contractor:DOYON DRILLING INC. UWI:500292027000 Active datum:01-13 OKB @73.00usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 16:30 - 21:30 5.00 CLEAN P DECOMP POOH W/BAKER FISHING BHA#6 F/ 10240'MD T/BHA @ 256'MD -PUW=215KLBS,SOW=152KLBS -MONITOR WELL F/10 MINS PRIOR T/BHA ENTERING BOP STACK(48PH LOSS RATE W/ 9.8PPG MW IN AND OUT) 21:30 - 23:00 1.50 CLEAN P DECOMP L/D BAKER FISHING BHA#6,STD BACK 6.25" DC'S AND BREAK OFF BAKER JUNK MILL AND BOOT BASKETS -RECOVER 4LBS OF METAL DEBRIS,WITH SEVERAL PIECES OF CUTTER FROM WHAT LOOKS LIKE A MILL/BIT THAT WAS LEFT DOWN HOLE -HEAVY WEAR ON 6 BLADED CARBIDE MILL, REPLACED W/AGGRESSIVE 6 BLADE CARBIDE MILL(LARGER BACK RAKE ON BLADES) 23:00 - 00:00 1.00 CLEAN P DECOMP CLEAN AND CLEAR RIG FLOOR,M/U BOOT BASKETS IN PREP F/RUNNING BAKER FISHING MILLING BHA#7 FLUID LOSSES TO WELL BORE LAST(12)HRS =88 BBLS. -O/A=120 PSI @ 18:00 HRS,BLED TO 0 PSI, (GAS). -0/A=140 PSI @ 00:00 HRS,BLED TO 0 PSI, (GAS). -9.8 PPG MW IN AND OUT 10/3/2015 00:00 - 00:30 0.50 CLEAN P DECOMP SERVICE AND INSPECT RIG FLOOR EQUIPMENT 00:30 - 01:00 0.50 CLEAN P DECOMP MAKE UP BAKER FISHING BHA#7 -MONITOR WELL,LOSS RATE 4.2BPH W/ 9.8PPG MW IN AND OUT -RIH F/SURFACE T/231'MD 01:00 - 06:00 5.00 CLEAN P DECOMP CONTINUE T/RIH W/BAKER FISHING BHA#7 ON STANDS F/DERRICK. -RIH TO 10,183'. 06:00 - 12:00 6.00 CLEAN P DECOMP PJSM.ACQUIRE SLOW PUMP RATES.MP1= 30 SPM/130 PSI,40 SPM/200 PSI. -MP2=30 SPM/180 PSI,40 SPM/280 PSI.UP WT=215K,DOWN WT=149K,ROTATING WT =175K. -ROTATING @ 80 RPM W/10K FT/LBS FREE SPIN TORQUE.ALL WT CHECKS INCLUDE 40K TOP DRIVE. -TAG CEMENT/JUNK @ 10,240'.MILL W/4 BPM/320 PSI,80 RPM W/10-13K FT/LBS TORQUE.10-15K WOB. -PUMP 40 BBLS HI VIS SWEEP AFTER MILLING 5'.MILL F/10,240'-10,254'. -FLUID LOSSES TO WELL BORE=32 BBLS OF 9.8 PPG BRINE LAST(12)HRS. -O/A=140 PSI @ 00:00 HRS,BLED TO 0 PSI, (GAS). -O/A=110 PSI @ 06:00 HRS,BLED TO 0 PSI, (GAS). 12:00 - 13:00 1.00 CLEAN P DECOMP PTSM.CONTINUE MILLING CEMENT/JUNK,4 -6 BPM/680 PSI,90 RPM,12K TORQUE. -MILL F/10254'-10,257',DRY TAG W/O ROTATION @ 10,256'. Printed 11/11/2015 4:07:38PM • North America-ALASKA-BP Page 13 of 29 Operation Summary Report Common Well Name:01-13 AFE No Event Type:WORKOVER(WO) Start Date:9/23/2015 End Date:10/17/2015 X4-011 FV-E:(4,200,000.00) Project:Prudhoe Bay Site:PB DS 01 Rig Name/No.:DOYON 16 Spud Date/Time:12/5/1977 12:00:00AM Rig Release:10/17/2015 Rig Contractor:DOYON DRILLING INC. UWI:500292027000 Active datum:01-13 OKB @73.00usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 13:00 - 16:00 3.00 CLEAN P DECOMP CIRCULATE 4OBBL HI-VIS SWEEP SURFACE T/ SURFACE -@ 10BPM=1350PSI -MONITOR WELL F/10MINS,5BPH LOSS RATE W/9.8PPG MW IN AND OUT -PMP 3OBBL DRY JOB 16:00 - 20:30 4.50 CLEAN P DECOMP POOH W/BAKER FISHING BHA#7 F/ 10256'MD T/BHA @ 250'MD -PU W=215KLBS,SOW=150KLBS -MONITOR WELL PRIOR T/PULLING BHA THROUGH STACK,5BPH LOSS RATE W/ 9.8PPG MW IN AND OUT 20:30 - 21:30 1.00 CLEAN P DECOMP L/D BAKER FISHING BHA#7 W/6.25"DC'S -CLEAN OUT BOOT BASKETS,RECOVER 2LBS CEMENT DEBRIS 21:30 - 23:30 2.00 CLEAN P DECOMP CLEAN AND CLEAR RIG FLOOR,SEND OUT BAKER FISHING TOOLS,RIG UP BOPE TEST EQUIPMENT 23:30 - 00:00 0.50 BOPSUR P DECOMP TEST BOPE F/250PSI LOW,3500PSI HIGH F/ SMINS EACH W/4",4.5",AND 9-5/8"TEST JNTS -AOGCC REP MATHEW HERRERA ON LOCATION TO WITNESS BOPE TEST FLUID LOSSES TO WELL BORE=38 BBLS OF 9.8 PPG BRINE LAST(12)HRS. -O/A=110 PSI @ 18:00 HRS,BLED TO 0 PSI, (GAS). -0/A=130 PSI @ 00:00 HRS,BLED TO 0 PSI, (GAS). 10/4/2015 00:00 - 06:00 6.00 BOPSUR P DECOMP CONTINUE T/TEST BOPE W/4",4.5",AND 9-5/8"TEST JNTS,ANNULAR W/4"TEST JNT -TEST T/250PSI LOW,3500PSI HIGH F/5 MINS EACH -AOGCC REP MATHEW HERERRA ON LOCATION T/WITNESS TESTING. -IBOP FAILED TEST.BLOW DOWN CHOKE AND KILL MANIFOLDS. 06:00 - 13:00, 7.00 BOPSUR N RREP DECOMP PJSM.REMOVE IBOP FROM TOP DRIVE. -REPLACE W/GOOD IBOP AND MAKE OTHER NECESSARY REPAIRS. -NOTIFY AOGCC OF IMPENDING TEST, WITNESS WAIVED BY AOGCC REP MATT HERRERA. -TEST IBOP TO 250/3500 PSI,5 MIN EACH/ CHARTED,WITNESSED BY BP WSLAND DOYON TOOLPUSHER.GOOD TEST. -LOSSES TO WELL BORE LAST(12)HRS=53 BBLS 9.8 PPG BRINE. -0/A=140 PSI @ 00:00 HRS,BLED TO 0 PSI, (GAS) -0/A=110 PSI @ 06:00 HRS,BLED TO 0 PSI, (GAS) NO SPR'S THIS TOUR 13:00 - 14:00 1.00 TIEBAC P OTHCMP R/D TEST EQUIPMENT,B/D ALL SURFACE LINES,INSTALL BALES AND ELEVATORS Printed 11/11/2015 4:07:38PM • S North America-ALASKA-BP Page 14 of 29 Operation Summary Report Common Well Name:01-13 AFE No Event Type:WORKOVER(WO) Start Date:9/23/2015 End Date:10/17/2015 X4-011 FV-E:(4,200,000.00) Project:Prudhoe Bay Site:PB DS 01 Rig Name/No.:DOYON 16 Spud Date/Time:12/5/1977 12:00:00AM Rig Release:10/17/2015 Rig Contractor:DOYON DRILLING INC. UWI:500292027000 Active datum:01-13 OKB @73.00usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 14:00 - 17:00 3.00 TIEBAC P OTHCMP MOBILIZE LINER RUNNING EQUIPMENT TO RIG FLOOR. -INSPECT ALL EQUIPMENT,WALK DOWN PIPE SHED T/ENSURE ALL EQUIPMENT IS PRESENT AND IN ORDER AS PER APPROVED TALLY -M/U FLOOR VALVE T/CROSS OVER T/4.5" BUTTRESS THREAD 17:00 - 21:00 4.00 TIEBAC P OTHCMP P/U AND M/U SHOE TRACK,4.5"LNR,X-OVER T/7"JOINT,BOT LNR HANGER AND PKR -BAKER LOC ALL CONNECTIONS BELOW 4.5" VAM X-OVER IN SHOE TRACK -MILL AND FILL PACKER W/PAL-O-MIX. 21:00 - 00:00 3.00 TIEBAC P OTHCMP RIH W/SCAB LNR ASSEMBLY ON 4"DP STANDS OUT OF THE DERRICK @ 90FPM FILLING EVERY 5 STDS T/3406'MD -PUW=87KLBS,SOW=87KLBS LOSSES TO WELL BORE LAST(12)HRS=28 BBLS 9.8 PPG BRINE. -O/A=110 PSI @ 12:00 HRS,BLED TO 0 PSI, (GAS) -0/A=140 PSI @ 18:00 HRS,BLED TO 0 PSI, (GAS) NO SPR'S THIS TOUR 10/5/2015 00:00 - 00:30 0.50 TIEBAC P OTHCMP SERVICE AND INSPECT RIG FLOOR EQUIPMENT 00:30 - 06:00 5.50 TIEBAC P OTHCMP CONTINUE T/RIH W/4.5"X 7"SCAB LNR ON DP STANDS OUT OF DERRICK -RIH 90FPM,FILLING DRILL PIPE EVERY(5) STANDS. F/3406'MD T/10246'MD -TAG UP 10'HIGH @ 10246'MD 06:00 - 06:30 0.50 TIEBAC P OTHCMP ATTEMPT T/CIRCULATE LNR DOWN @ 5BPM TAGGING UP @ 10246'MD,REPEAT 4X'S,CALL ODE 06:30 - 07:30 1.00 TIEBAC P OTHCMP DECISION T/CEMENT LNR @ 10245'MD, SPACE OUT DP T/P/U CEMENT HEAD,R/U CEMENT HEAD 07:30 - 08:00 0.50 TIEBAC P OTHCMP RECORD PARAMETERS,PLACE LNR SHOE @ 10245'M D -PUW=200KLBS,SOW=145KLBS PJSM W/SLB,CH2,AND RIG CREW 08:00 - 09:00 1.00 TIEBAC P OTHCMP SLB FLUSH LINES W/10BBL H20,PT LINES T/ 250PSI LOW,4600PSI HIGH,F/5 MINS EACH, VERIFY TRIPS ARE SET AND ACTUATE PROPERLY(GOOD) -MIX CEMENT IN PREP F/CIRCULATION Printed 11/11/2015 4:07:38PM • • North America-ALASKA-BP Page 15 of 29 Operation Summary Report Common Well Name:01-13 AFE No Event Type:WORKOVER(WO) Start Date:9/23/2015 End Date:10/17/2015 X4-011 FV-E:(4,200,000.00) Project:Prudhoe Bay Site:PB DS 01 Rig Name/No.:DOYON 16 Spud Date/Time:12/5/1977 12:00:00AM Rig Release:10/17/2015 Rig Contractor:DOYON DRILLING INC. UWI:500292027000 Active datum:01-13 OKB @73.00usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 09:00 - 11:00 2.00 TIEBAC P OTHCMP SLB PUMP 52BBLS OF 15.8PPG CLASS G CEMENT -ICP=215 PSI @ 4 BPM,FCP=256 PSI @ 4.7 BPM. -CLOSE SURFACE SAFETY VALVE, FLUSH LINES ACROSS THE CEMENT HEAD W/8BBLS OF H20. -DROP DART,CEMENTERS DISPLACE CEMENT W/ 9.8PPG BRINE @ 5.5BPM. -ICP=15OPSI,OBSERVE PRESSURE INCREASING W/84 BBLS AWAY.INCREASE F/ 110 PSI-550 PSI IN SHORT AMOUNT OF TIME, (UNDER 1 MIN). -W/95 BBLS AWAY,SLOW PUMP RATE TO 3 BPM @ 505 PSI.W/102.4 BBLS AWAY OBSERVE PRESSURE INCREASE SUDDENLY TO 1700 PSI. -TRIPPED OUT PUMP.RESET AND PRESSURE UP TO 2300 PSI,NO INDICATION OF PLUG LAUNCHING.INCREASE PRESSURE TO 2700 PSI. -NO INDICATION OF PLUG LAUNCH,INFORM TOWN OF SITUATION AND CONSULT W/ BAKER OFFICE.DECISION MADE TO GO AHEAD AND SET HANGER. -W/2900 PSI ON DP,SET DOWN TO 75K TO VERIFY HANGER IS SET. -STAGE PRESSURE UP TO 4000 PSI AND HOLD F/10 MINUTES,STAGE ON UP TO 4300 PSI AND HOLD. -BLEED PRESSURE AND CHECK FLOATS, FLOATS HOLDING,NO FLOWBACK. -CEMENT IN PLACE @ 8:50 AM 10/05/2015. 11:00 - 13:00 2.00 TIEBAC P OTHCMP RELEASE RUNNING TOOL AS PER BAKER REP,CONFIRM RELEASE,L/D CEMENT HEAD AND BEGIN CIRCULATING OUT CEMENT -P/U DOG SUB 9'ABOVE ZXP PKR,CBU @ 10BPM=1600PSI,SLOW T/4BPM 490PSI,SET DOWN 5OKLBS ON PKR T/CONFIRM SET (GOOD) -ROTATE 20RPM SET DOWN ON PKR,P/U DOGS 9'ABOVE PKR AND CONTINUE T/CBU @ 10BPM W/1600PSI -@ 500 BBLS PUMPED, CEMENT RETURNS SEEN,DUMP 67BBLS OF STRUNG OUT CONTAMINATED CEMENT TO CUTTINGS BOX 13:00 - 15:00 2.00 TIEBAC P OTHCMP PMP OUT OF HOLE 50'ABOVE TOP OF 7"LNR @ 9BPM,1100PSI,CBU @ 9-1OBPM 1060-1300PSI -MONITOR WELL F/10MINS(STATIC)9.8PPG MW IN AND OUT,PMP 25 BBL DRY JOB,BLOW DOWN TD 15:00 - 19:30 4.50 TIEBAC P OTHCMP POOH W/SCAB LNR RUNNING TOOL F/ 9695'MD T/146'MD -PU W=18OKLBS,SOW=146KLBS -SLB E-LINE ON LOCATION @ 18:30 F/ LOGGING RUN 19:30 - 20:30 1.00 TIEBAC P OTHCMP BREAK DOWN BAKER COMPLETIONS LNR RUNNING TOOL&2-7/8"STINGER -GOOD INDICATION OF PLUG LAUNCH,NO IRREGULARITIES WITH THE LNR RUNNING TOOL Printed 11/11/2015 4:07:38PM • • North America-ALASKA-BP Page 16 of 29 Operation Summary Report Common Well Name:01-13 AFE No Event Type:WORKOVER(WO) Start Date:9/23/2015 End Date:10/17/2015 X4-011 FV-E:(4,200,000.00) Project:Prudhoe Bay Site:PB DS 01 Rig Name/No.:DOYON 16 Spud Date/me:12/5/1977 12:00:00AM Rig Release:10/17/2015 Rig Contractor:DOYON DRILLING INC. UWI:500292027000 Active datum:01-13 OKB @73.O0usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 20:30 - 21:30 1.00 TIEBAC P OTHCMP CLEAN AND CLEAR RIG FLOOR,SCRUB EXCESS 9.8PPG VIS BRINE F/RIG FLOOR 21:30 - 23:00 1.50 TIEBAC P OTHCMP MOBILIZE AND R/U SLB E-LINE TOOLS AND EQUIPMENT F/USIT LOG AND GR/CCL LOG RUNS 23:00 - 00:00 1.00 EVAL P OTHCMP RIH W/SLB E-LINE USIT LOGGING TOOLS F/ SURFACE T/3000'MD,LOG T/SURFACE @ 60FPM 10/6/2015 00:00 - 01:30 1.50 EVAL P OTHCMP CONTINUE TO USIT LOG UP FROM 3000'TO SURFACE. -LOGGING @ 60 FT/MIN.RE-LOG F/2800'- 1800'. 01:30 - 06:30 5.00 EVAL P OTHCMP PJSM.L/D LOGGING TOOLS,RE-DRESS HEAD. -M/U 3.51"GAUGE RING/GAMMA RAY/CCL. RIH F/SURFACE T/10160'MD -LOG UP F/10160'MD-8800'MD,POOH W/SLB E-LINE(TOP OF LNR LOCATED AT 9696'MD) 06:30 - 07:30 1.00 EVAL P OTHCMP R/D SLB E-LINE TOOLS AND E-LINE UNIT 07:30 - 08:00 0.50 DHB P OTHCMP MOBILIZE RBP T/RIG FLOOR AND M/U 08:00 - 12:00 4.00 DHB P OTHCMP MONITOR WELL F/10MINS(STATIC,9.8MW IN AND OUT),RIH W/RBP F/SURFACE T/ 5897'MD -PUW=120KLBS,SOW=109KLBS LOSSES T/WELLBORE AT NOON=OBBLS W/ 9.8PPG BRINE IN AND OUT -OA=140PSI @ 00:00HRS,BLEED T/OPSI, (ALL GAS) -OA=105PSI @ 06:00HRS,BLEED T/OPSI, (ALL GAS) 12:00 - 12:30 0.50 DHB P OTHCMP SERVICE RIG FLOOR EQUIPMENT 12:30 - 14:30 2.00 DHB P OTHCMP CONTINUE T/RIH ON 4"DP STANDS OUT OF THE DERRICK W/RBP DOWN T/9700'MD -PUW=185KLBS,SOW=135KLBS 14:30 - 15:00 0.50 DHB P OTHCMP SET HES RBP @ 9752'MD AS PER HES REP -SET DOWN 15KLBS TO VERIFY PLUG SET, AS WELL AS 10KLBS P/U WEIGHT -MONITOR WELL F/10 MINS(STATIC W/ 9.8PPG MW IN AND OUT) 15:00 - 17:00 2.00 DHB P OTHCMP SLIP AND CUT 60'OF DRILL LINE,INSPECT AND SERVICE DRAWWORKS 17:00 - 22:00 5.00 DHB P OTHCMP PUMP A DRILL STRING VOLUME OF NON-VIS 9.8PPG BRINE,DUMP 700#"S(30')OF RIVER SAND ON TOP OF RBP 22:00 - 22:30 0.50 DHB P OTHCMP ALLOW SAND T/FALL OUT OF DRILL STRING 22:30 - 00:00 1.50 DHB P OTHCMP POOH W/HES RBP RUNNING TOOL F/ 9742'MD T/7698'MD -PUW=155KLBS,SOW=125KLBS LOSSES T/WELLBORE AT NOON=OBBLS W/ 9.8PPG BRINE IN AND OUT -OA=100PSI @ 12:O0HRS,BLEED T/OPSI, (ALL GAS) -OA=130PSI @ 18:00HRS,BLEED T/OPSI, (ALL GAS) NO PUMP OPS THIS TOUR 10/7/2015 00:00 - 00:30 0.50 DHB P OTHCMP SERVICE AND INSPECT RIG FLOOR EQUIPMENT Printed 11/11/2015 4:07:38PM • • North America-ALASKA-BP Page 17 of 29 Operation Summary Report Common Well Name:01-13 AFE No Event Type:WORKOVER(WO) Start Date:9/23/2015 End Date:10/17/2015 X4-011 FV-E:(4,200,000.00) Project:Prudhoe Bay Site:PB DS 01 Rig Name/No.:DOYON 16 Spud Date/Time:12/5/1977 12:00:00AM Rig Release:10/17/2015 Rig Contractor:DOYON DRILLING INC. UWI:500292027000 Active datum:01-13 OKB @73.00usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 00:30 - 02:30 2.00 DHB P OTHCMP CONTINUE T/POOH W/RBP RUNNING TOOL F/7698'MD T/4652'MD 02:30 - 03:00 0.50 DHB P OTHCMP PIPE PULLING WET,DECISION T/KELLY UP AND LIGHTLY CIRCULATE T/ENSURE SAND ISN'T PACKED OFF -BREAK CIRCULATION @ 2BPM,70PSI AND DISPLACE,(NO PRESSURE UP SEEN)B/D TOP DRIVE 03:00 - 05:30 2.50 DHB P OTHCMP CONTINUE T/POOH W/RBP RUNNING TOOL F/4652'MD T/SURFACE -L/D RBP RUNNING TOOL 05:30 - 06:30 1.00 CUT P OTHCMP CLEAN AND CLEAR RIG FLOOR EQUIPMENT DUE T/BRINE 06:30 - 07:30 1.00 CUT P OTHCMP M/U BAKER FISHING MULTISTRING CUTTER BHA#8 T/CUT 9-5/8"CSG 07:30 - 09:30 2.00 CUT P OTHCMP RIH F/SURFACE T/2319'MD -MONITOR WELL(STATIC W/9.8PPG MW IN AND OUT) 09:30 - 10:30 1.00 CUT P OTHCMP GAIN CUTTING PARAMETERS,LOCATE COLLARS @ 2305'MD/2348'MD/2387'MD, SPACE OUT F/TOOL JNT,STAGE CUTTER @ 2360'MD -PUW=70KLBS,SOW=74KLBS,UTILIZE 3BPM=240PSI T/LOCATE COLLARS 10:30 - 12:00 1.50 CUT P OTHCMP LRS PT LINES T/250/4000PSI T/5 MINS EACH, PT DOWN STREAM LINE T/FLOW BACK TANK T/250/3000PSI F/5 MINS EACH LOSSES T/WELLBORE AT NOON=OBBLS W/ 9.8PPG BRINE IN AND OUT -OA=145PSI @ 00:00HRS,BLEED T/OPSI, (ALL GAS) -OA=100PSI @ 06:00HRS,BLEED T/OPSI, (ALL GAS) 12:00 - 13:00 1.00 CUT P OTHCMP TEST CIRCULATING LINES/CHOKE SKID MANIFOLD T/250/3000PSI F/5MINS EACH 13:00 - 13:30 0.50 CUT P OTHCMP CUT 9-5/8"CSG W/7ORPM 4K FT-LBS TQ, 860PSI @ 2360'MD/GOOD INDICATION OF CUT W/11K FT-LBS TQ INCREASE,PIPE JUMP,AND 50PSI INCREASE ON THE OA 13:30 - 14:00 0.50 CUT P OTHCMP B/D T/D,R/U HEAD PIN W/TIWAND CIRC LINES,DROP DART T/OPEN CIRC SUB (GOOD INDICATION OF SUB OPENING) 14:00 - 16:30 2.50 CUT P OTHCMP LINE UP LRS AND PUMP 23BBLS OF 120DEG DIESEL DOWN DP W/RETURNS T/PITS, DOWN ON THE PUMPS,CLOSE ANNULAR, OPEN OAT/TAKE RETURNS T/FLOW BACK TANK,LRS PUMP P/U T/700PSI W/NO RETURNS T/FLOW BACK TANK,CALL ODE, CONTINUE T/P/U T/1800PSI W/NO RETURNS OR OA PRESSURE. -LRS PUMP @ 2-3BPM,57BBLS TOTAL PUMPED 16:30 - 19:00 2.50 CUT P OTHCMP R/U LRS T/PUMP DOWN THE OA TAKING RETURNS UP THE DRILL STRING BACK T/ THE PITS -PUMP 20BBLS @ 1-2BPM,30PSI W/NO RETURNS OR PRESSURE Printed 11/11/2015 4:07:38PM • • North America-ALASKA-BP Page 18 of 29 Operation Summary Report Common Well Name:01-13 AFE No Event Type:WORKOVER(WO) Start Date:9/23/2015 End Date:10/17/2015 X4-011 FV-E:(4,200,000.00) Project:Prudhoe Bay Site:PB DS 01 Rig Name/No.:DOYON 16 Spud Date/Time:12/5/1977 12:00:00AM Rig Release:10/17/2015 Rig Contractor:DOYON DRILLING INC. UW:500292027000 Active datum:01-13 OKB @73.00usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 19:00 - 22:00 3.00 CUT P OTHCMP LINE UP 2ND KILL ON THE OA AND FLUID PACK W/30BBLS OF 9.8PPG BRINE TAKING RETURNS UP THE DP T/CUTTINGS TANK, PRESSURE UP T/1500PSI,SEE A SUDDEN PRESSURE LOSS AND RETURNS UP THE DRILL STRING,STOP PUMPING AND LINE UP T/PUMP DOWN DRILL STRING W/ANNULAR CLOSED,SQUEEZING THE DIESEL FROM THE DRILL STRING INTO THE OA W/THE FINAL 55BBLS F/LRS.135BBLS OF 120DEG DIESEL TOTAL PUMPED INTO OA.CLOSE OA. 22:00 - 23:00 1.00 CUT P OTHCMP B/D CIRC MANIFOLD AND LINE TO FLOW BACK TANK,ALLOW DIESEL T/SOAK IN OA F/ 1 HR 23:00 - 00:00 1.00 CUT P OTHCMP LINE UP T/PUMP DOWN DRILL STRING W/ 138BBLS OF BRINE @ 5BPM 980-1000PSI, FOLLOW THE BRINE W/40BBLS OF DEEP CLEAN PILL @ 2BPM=835PSI THROUGH THE OA,TAKING RETURNS UP THE OAT/THE FLOW BACK TANK. LOSSES T/WELLBORE AT NOON=OBBLS W/ 9.8PPG BRINE IN AND OUT -OA=30PSI @ 12:00HRS,BLEED T/OPSI,(ALL GAS) 10/8/2015 00:00 - 01:30 1.50 CUT P OTHCMP CONTINUE T/CHASE 40BBL DEEP CLEAN PILL W/136BBLS OF 9.8PPG BRINE F/PITS @ 2BPM W/100PSI -INCREASE PUMP RATE T/5BPM=900PSI AND CONTINUE T/CIRC 9.8PPG BRINE T/ SURFACE 01:30 - 02:30 1.00 CUT P OTHCMP MONITOR WELL/OA(STATIC),OPEN ANNULAR AND CBU @ 10BPM=985PSI,MONITOR WELL,STATIC W/9.8PPG BRINE IN AND OUT 02:30 - 03:00 0.50 CUT P OTHCMP R/D CIRC LINES ON FLOOR,BLOW DOWN CHOKE LINE 03:00 - 05:00 2.00 CUT P OTHCMP POOH W/BAKER FISHING BHA#8 F/2360'MD T/SURFACE 05:00 - 06:00 1.00 STCTPL P OTHCMP CLEAN AND CLEAR FLOOR OF BOT TOOLS, MOBILIZE 9-5/8"HANDLING EQUIPMENT 06:00 - 06:30 0.50 STCTPL P OTHCMP M/U SAFETY JOINT AND SAFETLY VALVE WI ELEVATOR CROSSOVER SO YOU DON'T HAVE T/CHANGE ELEVATORS T/P/U SAFETY JOINT 06:30 - 07:30 1.00 STCTPL P OTHCMP ENGAGE 9-5/8"HANGER,CAMERON ON LOCATION T/BOLDS,LAST LDS VERY TIGHT, UNABLE T/B/O,CALL ODE 07:30 - 09:00 1.50 STCTPL P OTHCMP RELEASE SPEAR AND PULL T/SURFACE, ATTEMPT T/BOLDS AGAIN W/NO SUCCESS 09:00 - 10:00 1.00 STCTPL N WSEQ OTHCMP CALL TOWN AND DISCUSS OPTIONS T/MOVE FORWARD 10:00 - 10:30 0.50 STCTPL N WSEQ OTHCMP L/D SPEAR 10:30 - 12:00 1.50 W-ISUR N WSEQ OTHCMP LOAD 4-3/4"AND 6-1/4"DRILL COLLARS IN PIPE SHED LOSSES T/WELLBORE @ NOON=OBBLS MW=9.8PPG IN AND OUT NO ANNULUS PRESSURE 12:00 - 12:30 0.50 WHSUR P OTHCMP SERVICE AND INSPECT RIG FLOOR EQUIPMENT AND PIPE SKATE Printed 11/11/2015 4:07:38PM • North America-ALASKA-BP Page 19 of 29 Operation Summary Report Common Well Name:01-13 AFE No Event Type:WORKOVER(WO) Start Date:9/23/2015 End Date:10/17/2015 X4-011 FV-E:(4,200,000.00) Project:Prudhoe Bay Site:PB DS 01 Rig Name/No.:DOYON 16 Spud Date/me:12/5/1977 12:00:00AM Rig Release:10/17/2015 Rig Contractor.DOYON DRILLING INC. UW1:500292027000 Active datum:01-13 OKB @73.00usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase i Description of Operations (hr) (usft) 12:30 - 13:30 1.00 WHSUR N WSEQ OTHCMP OPEN AND MONITOR OA BACK T/FLOW BACK TANK,NO SIGNS OF FLOW,MONITOR WELLBORE F/10MINS,STATIC W/9.8PPG MW IN AND OUT 13:30 - 15:00 1.50 WHSUR N WSEQ OTHCMP P/U AND M/U 9/4-3/4"DRILL COLLARS,8/ 6-1/4"DRILL COLLARS W/MULE SHOE 15:00 - 19:30 4.50 WHSUR N WSEQ OTHCMP RIH ON 4"DP T/8010'MD,P/U HES RTTS TOOL ANDN SET 1 STAND BELOW ROTARY TABLE -PUW=177KLBS,SOW=134KLBS 19:30 - 20:30 1.00 WHSUR N WSEQ OTHCMP CAMERON REP BOLDS(RUN IN TWO OF THE UPPER LDS W/EASE TO PROPER ACTUATION DEPTH,B/O PROBLEM LDS W/EASE,B/O TWO SUPPORT LDS'S) -ALL LDS'S 13/0 T/PROPER DEPTH AS MEASURED BY CAMERON AND VERIFIED BY WSL 20:30 - 21:00 0.50 WHSUR N WSEQ OTHCMP M/U RTTS RETRIEVAL TOOL W/TIW,RIH, CLOSE ANNULAR AND RELEASE RTTS, VERIFY NO PRESSURE BELOW THE TOOL, OPEN ANNULAR,POOH AND L/D RTTS RUNNING TOOL 21:00 - 00:00 3.00 WHSUR N WSEQ OTHCMP POOH W/MULE SHOE COLLAR WEIGHT SET UP F/8010'MD T/3365'MD -PUW=104KLBS,SOW=100KLBS LOSSES T/WELLBORE @ NOON=OBBLS MW=9.8PPG IN AND OUT NO ANNULUS PRESSURE NO PUMP OPERATIONS 10/9/2015 00:00 - 00:30 0.50 WHSUR P OTHCMP SERVICE AND INSPECT RIG FLOOR EQUIPMENT AND PIPE SKATE 00:30 - 03:00 2.50 WHSUR N WSEQ OTHCMP CONTINUE T/POOH W/4"DP AND DC'S F/ • 3365'MD T/SURFACE 03:00 - 04:00 1.00 PULL P OTHCMP ENGAGE MANDREL HANGER AND PULL TO THE FLOOR -M/U BAKER FISHING BHA#9 -ENGAGE 9-5/8"MANDREL HANGER AND PULL TO THE FLOOR,TOOK 40K OVER STRING WEIGHT TO PULL MANDREL FREE FROM HANGER. -PUW 150K SOW 125K 04:00 - 06:30 2.50 CONDHL P OTHCMP CIRCULATE TO CLEAN WELL BORE -PUMP 40 BBL DEEP CLEAN PILL AT 10 BPM AT 150 PSI WHILE RECIPROCATING PIPE. -CBU X 3 UNTIL WELL BORE FLUID CLEANED UP FINAL RATE 5 BPM AT 60 PSI -MONITOR HOLE FOR 10 MINUTES *BREAK OUT GAS WITH NO GAINS OBSERVED WHILE MONITORING WELL BORE. WELL BORE LOSING AT+/-1 BPH 9.8 PPG BRINE IN AND OUT 06:30 - 07:30 1.00 PULL P OTHCMP LAY DOWN HANGER AND SPEAR 07:30 - 08:00 0.50 PULL P OTHCMP CHANGE ELEVATORS -CHANGE OUT ELEVATORS FROM 4"TO 9 5/8" -BLOW DOWN TOP DRIVE -PJSM FOR LAYING DOWN CASING Printed 11/11/2015 4:07:38PM • • North America-ALASKA-BP Page 20 of 29 Operation Summary Report Common Well Name:01-13 AFE No Event Type:WORKOVER(WO) Start Date:9/23/2015 End Date:10/17/2015 X4-011 FV-E:(4,200,000.00) Project:Prudhoe Bay Site:PB DS 01 Rig Name/No.:DOYON 16 Spud Date/Time:12/5/1977 12:00:00AM Rig Release:10/17/2015 Rig Contractor:DOYON DRILLING INC. UM:500292027000 Active datum:01-13 OKB @73.00usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 08:00 - 12:00 4.00 PULL P OTHCMP POOH W/9-5/8"CSG F/CUT @ 2360'MD T/ 1400'MD -AVERAGE TORQUE TO BREAK 9 5/8" BUTTRESS CONNECTIONS 45K FT/LBS -PUW=105KLBS,SOW=101 KLBS LOSSES T/WELLBORE @ NOON=OBBLS MW=9.8PPG IN AND OUT NO ANNULUS PRESSURE 12:00 - 15:30 3.50 PULL P OTHCMP CONTINUE T/POOH W/9-5/8"CSG F/1400'MD T/1000'MD -@ 1300-1400'MD UNABLE T/SET THE STRING DOWN,STACKING OUT OATH DOWNWARD MOVEMENT 15:30 - 16:30 1.00 PULL P OTHCMP UNANNOUNCED D-1 DRILL W/AAR -CREW RESPONSE TIME 3:45 MINS 16:30 - 18:30 2.00 PULL P OTHCMP CONTINUE T/POOH W/9-5/8"CSG F/1000'T/ SURFACE -15 BOWSPRING CENTRALIZERS RECOVERED -CUT JOINT MEASURED 12.75' -NO BAD SPOTS OR ANOMOLIES FOUND ON CSG JOINTS PULLED -CSG COATED WITH 1/8"TO 1/4"ARCTIC PACK. -CUT WAS FLARED OUT AND HADASLIGHT SPLIT FROM COMPRESSION,11.15"OD 18:30 - 20:30 2.00 PULL P OTHCMP CLEAN CSG TOOLS AND RIG FLOOR/CLEAN EXCESS ARCTIC PAK/RIG FLOOR AND PITS 20:30 - 21:30 1.00 CLEAN P OTHCMP MOBILIZE BAKER FISHING CLEANOUT BHA# 10 T/RIG FLOOR 21:30 - 00:00 2.50 CLEAN P OTHCMP M/U BAKER FISHING DRESS OFF BHA#10 W/ BULL NOSE,STRING MILLS,AND 4-3/4"DRILL COLLARS T/456'MD -PUW=50KLBS,SOW=55KLBS LOSSES T/WELLBORE(d MIDNIGHT=OBBLS MW=9.8PPG IN AND OUTD NO ANNULUS PRESSURE 10/10/2015 00:00 - 00:30 0.50 CLEAN P OTHCMP SERVICE RIG FLOOR EQUIPMENT AND PIPE SKATE 00:30 - 01:30 1.00 CLEAN P OTHCMP CONTINUE T/RIH W/BAKER FISHING CLEANOUT BHA F/456'MD T/503'MD,HARD TAG W/12-1/4"STRING MILL -PUW=52KLBS,SOW=55KLBS 01:30 - 02:00 0.50 CLEAN P OTHCMP GAIN MILLING PARAMETERS,RIH AND TAG OBSTRUCTION,MILL FROM 503-505'MD, DRIFT UP AND DOWN THROUGH OBSRUCTION W/SLIGHT BOBBLE -ROT=60RPM,@ 4BPM,FREE TQ=2K FT-LBS,150PSI WORKING PRESSURE -WORK THROUGH OBSTRUCTION W/1-2K WOB,3-4K FT-LBS TQ UNTIL THROUGH TIGHT SPOT 02:00 - 03:30 1.50 CLEAN P OTHCMP CONTINUE T/RIH W/BAKER FISHING CLEANOUT BHA F/503'MD T/1483'MD,HARD TAG W/12-1/4"STRING MILL Printed 11/11/2015 4:07:38PM • North America-ALASKA-BP Page 21 of 29 Operation Summary Report Common Well Name:01-13 AFE No Event Type:WORKOVER(WO) Start Date:9/23/2015 End Date:10/17/2015 X4-011 FV-E:(4,200,000.00) Project:Prudhoe Bay Site:PB DS 01 Rig Name/No.:DOYON 16 Spud Date/Time:12/5/1977 12:00:00AM Rig Release:10/17/2015 Rig Contractor:DOYON DRILLING INC. UWI:500292027000 Active datum:01-13 OKB @73.O0usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 03:30 - 04:00 0.50 CLEAN P OTHCMP ACQUIRE MILLING PARAMETERS,RIH AND TAG OBSTRUCTION,MILL FROM 1483'-1485'MD,DRIFT UP AND DOWN THROUGH OBSRUCTION CLEAN -ROT=60RPM,@ 4BPM,FREE TQ=2K FT-LBS,150PSI WORKING PRESSURE -WORK THROUGH OBSTRUCTION W/1-2K WOB,3-4K FT-LBS TQ UNTIL THROUGH TIGHT SPOT 04:00 - 04:30 0.50 CLEAN P OTHCMP CONTINUE T/RIH W/BAKER FISHING BHA# 10 F/1485'MD T/2360'MD -CIRCULATE B/U @ 8BPM=330PSI (CONTINUE T/SEE CHUNKS OF ARCTIC PAC) 04:30 - 06:00 1.50 CLEAN P OTHCMP DRESS OFF 9-5/8"CSG STUMP W/BAKER FISHING CLEANOUT BHA#10 -NO-GO ON STRING MILL 10'INTO BHA @ 2370'MD,NO SIGN OF 8.5"STABILIZER HANGING UP ON 9-5/8"STUMP -P/U T/2360'MD AND ACQUIRE MILLING PARAMETERS AND BEGIN DRESSING OFF STUMP @ 2360'MD W/2K FT-LBS TQ,3-5KLBS WOB @ 60RPM -DRESS APPROX 0.5'OFF THE TOP OF THE STUMP 06:00 - 08:00 2.00 CLEAN P OTHCMP CIRCULATE 40BBL PILL OF DEEP CLEAN @ 6BPM 260PSI UNTIL WELLBORE CLEANS UP (4000STKS TOTAL) -MONITOR WELL F/10MINS,STATIC,W/ 9.8PPG MW IN AND OUT 08:00 - 09:00 1.00 CLEAN P OTHCMP POOH F/2360'MD T/329'MD -MONITOR WELL PRIOR T/PULLING BHA THROUGH STACK,STATIC W/9.8PPG MW IN AND OUT 09:00 - 12:00 3.00 CLEAN P OTHCMP CONTINUE T/TRIP OUT OF HOLE,L/D BAKER FISHING BHA#10,CLEAN AND CLEAR RIG FLOOR OF ARCTIC PAK LOSSES T/WELLBORE @ NOON=OBBLS MW=9.8PPG IN AND OUT NO ANNULUS PRESSURE 12:00 - 14:30 2.50 CLEAN P OTHCMP FLUSH BOPE/FUNCTION ALL RAMS/DRAIN STACK/SERVICE MUD CROSS/INSTALL TEST PLUG/R/U 2ND KILL T/FILL IN CLOSE BLINDS 14:30 - 17:00 2.50 BOPSUR P OTHCMP REMOVE UPPER RAMS,CLEAN AND INSPECT CAVITIES,INSTALL 7"RAMS IN UPPER DOORS 17:00 - 19:00 2.00 BOPSUR P OTHCMP R/U BOPE TEST EQUIPMENT,FILL STACK AND SURFACE EQUIPMENT W/FRESH WATER 19:00 - 23:00 4.00 BOPSUR P OTHCMP TEST BOPE T/250PS1 LOW,3500PSI HIGH,F/ 5 CHARTED MINS EACH W/4",4.5"AND 7" TEST JOINTS -AOGCC REP BOB NOBEL WAIVED WITNESS TO THE PRESSURE TEST -MONITOR FLUID LEVEL FROM IA 23:00 - 00:00 1.00 BOPSUR P OTHCMP R/D TEST EQUIPMENT AND BLOW DOWN ALL SURFACE EQUIPMENT LOSSES T/WELLBORE @ NOON=OBBLS MW=9.8PPG IN AND OUT NO ANNULUS PRESSURE Printed 11/11/2015 4:07:38PM • (1110 North America-ALASKA-BP Page 22 of 29 Operation Summary Report Common Well Name:01-13 AFE No Event Type:WORKOVER(WO) Start Date:9/23/2015 End Date:10/17/2015 X4-011 FV-E:(4,200,000.00) Project:Prudhoe Bay Site:PB DS 01 Rig Name/No.:DOYON 16 Spud Date/Time:12/5/1977 12:00:00AM Rig Release:10/17/2015 Rig Contractor:DOYON DRILLING INC. IUWI:500292027000 Active datum:01-13 OKB @73.00usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 10/11/2015 00:00 - 01:30 1.50 TIEBAC P OTHCMP STAGE CENTRALIZERS ON FLOOR,R/U 7" CSG EQUIPMENT,WALK DOWN PIPE SHED W/DRILLER AND BAKER T/VERIFY EQUIPMENT 01:30 - 11:30 10.00 TIEBAC P OTHCMP RIH W/7"VAMTOP 26#CSG F/SURFACE T/ 4000',TOPPING OFF EVERY 10 JOINTS -M/U 7"VAM TOP T/11950 FT-LBS TQ, -BAKER LOC ALL BUTRESS THREADS, UTILIZE JLSG ON ALL PREMIUM THREADS, HAND START EVERY CONNECTION -PUW=125KLBS,SOW=125KLBS 11:30 - 12:00 0.50 TIEBAC P OTHCMP RIG UP HEAD PIN ON CSG AND CIRCULATE B/U @ 5BPM,MONITOR WELL F/10MINS, STATIC W/9.8PPG MW IN AND OUT 12:00 - 13:00 1.00 TIEBAC P OTHCMP CONTINUE T/CBU @ 5BPM=280PSI,R/D HEAD PIN AND CIRC LINE 13:00 - 00:00 11.00 TIEBAC P OTHCMP CONTINUE T/RIH W/7"VAMTOP 26#CSG F/ 4000'T/9694'MD,TAG TOP OF PBR @ 9694'MD,ENTER PBR TAKING 2-3KLBS, NO-GO 9'INTO PBR @ 9703'MD -TOP OFF EVERY 10 JOINTS -M/U 7"VAM TOP T/11950 FT-LBS TO -BAKER LOC ALL BUTRESS THREADS, UTILIZE JLSG ON ALL PREMIUM THREADS, HAND START EVERY CONNECTION -UTILIZE 174 CENTRALIZERS 10/12/2015 00:00 - 01:00 1.00 TIEBAC P OTHCMP SPACE OUT 7"CASING -NO GO WITH SEAL ASSM IN TIE BACK AT 9703' -LAY DOWN JOINTS 234 AND 233 -MAKE UP PUP JOINTS AND JOINT 233 -PUW 265K SOW 205K 01:00 - 01:30 0.50 TIEBAC P OTHCMP PREP TO CEMENT -INSTALL BAIL EXTENSIONS AND QUICK LATCH CEMENT HEAD -RIG UP CEMENT LINES. 01:30 - 02:00 0.50 TIEBAC P OTHCMP SPACE OUT 7"CSG FOR CEMENT JOB -RIH AT PUMPING AT 1 BPM -STING IN TO LINER TOP OBSERVE PRESSURE INCREASE -BLEED OFF PRESSURE AND TAG NO GO WITH 5K AT 9703 -PRESSURE UP TO 240 PSI -PU UNTIL PRESSURE BLEEDS OFF -PU 1'TO 9693'TO PLACE PORTS ABOVE TIE BACK SLEEVE FOR CEMENT JOB 02:00 - 02:30 0.50 TIEBAC P OTHCMP PJSM WITH ALL PERSONEL INVOLVED WITH CEMENT JOB -REVIEW SOP -REVIEW PRESSURE CROSSCHECK LIST -WSL REVIEW CEMENT PARAMETERS SLB REP-GOOD 02:30 - 03:00 0.50 TIEBAC P OTHCMP PRESSURE TEST -PRESSURE TEST SLB LINES TO 250 PSI/4500 PSI-GOOD -PRESSURE TEST RIG LINES TO FLOW BACK TANK TO 250 P5I/2500 PSI-GOOD Printed 11/11/2015 4:07:38PM • S North America-ALASKA-BP Page 23 of 29 Operation Summary Report Common Well Name:01-13 (AFE No Event Type:WORKOVER(WO) Start Date:9/23/2015 End Date:10/17/2015 I X4-011FV-E:(4,200,000.00) Project:Prudhoe Bay Site:PB DS 01 Rig Name/No.:DOYON 16 Spud Date/Time:12/5/1977 12:00:00AM Rig Release:10/17/2015 Rig Contractor:DOYON DRILLING INC. UW:500292027000 Active datum:01-13 OKB©73.0ousft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 03:00 - 07:00 4.00 TIEBAC P OTHCMP CEMENT JOB -PUMP 390 BBL OF 15.3 PPG CLASS G CEMENT LEAD -PUMP 100 BBL OF 15.8 PPG UNISLURRY TAIL -DROP 7"WIPER PLUG -DISPLACE WITH 10 BBL FRESH WATER FOLLOWED BY 360.5 BBLS 9.8 PPG BRINE PLUG BUMPS 0.5BBLS OVER CALCULATED DISPLACEMENT 07:00 - 07:30 0.50 TIEBAC P OTHCMP SET DOWN INTO PBR W/SEALSTEM AS PRESSURE IS BLED OFF UNTIL PIPE REACHED NO-GO MARK,MONITOR IF SEALS ARE HOLDING F/10MINS.(GOOD TEST)P/U 50KLBS OVER STAB IN WEIGHT 195KLBS. FLUSH STACK W/17BBL BLACK WATER PILL W/NO RETURNS,SHUT DOWN AND INVESITGATE LOCATION OF RETURNS 07:30 - 09:00 1.50 TIEBAC N CEMT OTHCMP OPEN ANNULAR AND OBSERVE NO FLUID IN ANNULUS FROM CEMENT JOB,SECURE WELL,CONTACT TOWN TEAM FOR A PLAN T/ MOVE FORWARD,BLOW DWN AND R/D SLB LINES 09:00 - 11:00 2.00 TIEBAC N CEMT OTHCMP INSTALL GAUGES ON TBG AND OAT/ MONITOR PRESSURES -TBG=60PSI/10MINS,I/A=0 PSI -PERFORM FLUID SHOT ON 0/A,FLUID LEVEL©240'MD,WAIT 30MINS AND REPEAT, 240'MD -MONITOR TBG F/2HRS=200PSI OA=OPSI 11:00 - 12:00 1.00 TIEBAC N CEMT OTHCMP HOLD PJSM W/LRS,WSL,AND RIG CREW F/ PUMPING DIESEL DOWN ANNULUS -R/U LINES IN PREP T/PUMP 12:00 - 13:00 1.00 TIEBAC N CEMT OTHCMP LRS PT LINES T/250/3500PSI F/5 MINS EACH, FLUID PACK IA W/27BBLS DIESEL @ 2BPM, OPSI PRESSURE ON IA 13:00 - 15:30 2.50 TIEBAC N CEMT OTHCMP SHUT IN WELL AND MONITOR CHECKING IA FOR 10MINS,WELL STATIC,NO FLOW,NO VAC. -7"CSG SHOWING 500PSI PRESSURE, BLEED OFF 0.2BBLS AND PRESSURE DROPS T/0 PSI -R/D AND RELESE LRS 15:30 - 17:30 2.00 TIEBAC P OTHCMP SET CASING SLIPS IN ROTATRY,R/D CEMENT HEAD,CIRCULATION LINES,REMOVE BAIL EXTENSIONS 17:30 - 20:30 3.00 WHSUR P OTHCMP R/D BOPE TURNBUCKLES,BLEED OFF KOOMEY,BLEED TBG SPOOL VOID,SPLIT THE STACK©BASE OF TBG SPOOL, CAMERON REPS INSTALL 7"EMERGENCY SLIPS AND PACK OFF,195KLBS WEIGHT ON INDICATOR 20:30 - 22:30 2.00 WHSUR P OTHCMP CAMERON R/U WACHS CUTTER AND CUT 7" CSG/REMOVE CUT 7 STUB FROM ROTARY BY LAYING DOWN THE PUPS AND LANDING JOINT,R/D DOUBLE STACK TONGS AND 7" CSG EQUIPMENT 22:30 - 00:00 1.50 WHSUR P OTHCMP BREAK FLANGE CONNECTION ON GRAY SPOOL AND INSTALL NEW 13-5/8"MCEVOY SSH SPOOL IN THE CELLAR 10/13/2015 00:00 - 01:00 1.00 WHSUR P OTHCMP CONTINUE INSTALLATION OF PACKOFF AND DRESSING THE 7"CSG STUMP Printed 11/11/2015 4:07:38PM • • North America-ALASKA-BP Page 24 of 29 Operation Summary Report Common Well Name:01-13 AFE No Event Type:WORKOVER(WO) Start Date:9/23/2015 End Date:10/17/2015 X4-011FV-E:(4,200,000.00) Project:Prudhoe Bay Site:PB DS 01 Rig Name/No.:DOYON 16 Spud Date/Time:12/5/1977 12:00:00AM Rig Release:10/17/2015 Rig Contractor:DOYON DRILLING INC. UWI:500292027000 Active datum:01-13 OKB(g73.00usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 01:00 - 03:30 2.50 WHSUR P OTHCMP INSTALL NEW TBG SPOOL -PUMP AND FILL VOID W/PLASTIC PACKING 03:30 - 05:00 1.50 WHSUR P OTHCMP PRESSURE TEST 7"CSG PACK-OFF VOID T/ 5000PSI F/30 CHARTED MINS-GOOD 05:00 - 07:30 2.50 WHSUR P OTHCMP N/U BOPE AND INSTALL TEST PLUG 07:30 - 10:00 2.50 BOPSUR P OTHCMP CLEAN ARCTIC PACK FROM DRIP PAN, CHANGE OUT UPPER PIPE RAMS F/7"T/ 2-7/8"X 5"VBR'S 10:00 - 13:30 3.50 BOPSUR P OTHCMP PJSM,TEST BOPE WITH 2-7/8"AND 4-1/2" TEST JOINTS -BODY TEST BOPE 250/3500 PSI FOR 5 CHARTED MINUTES -TEST UPPER RAMS WITH 2-7/8"TEST JOINT, 250/3500 PSI FOR 5 CHARTED MINUTES -TEST ANNULAR PREVENTER WITH 2-7/8" TEST JOINT,250/3500 PSI FOR 5 CHARTED MINUTES -TEST UPPER RAMS WITH 4-1/2"TEST JOINT, 250/3500 PSI FOR 5 CHARTED MINUTES -ALL TESTS PASSED -RIG DOWN TEST EQUIPMENT 13:30 - 14:30 1.00 BOPSUR P OTHCMP PJSM,PULL TEST PLUG,INSTALL WEAR RING 14:30 - 16:00 1.50 CLEAN P OTHCMP PJSM,MU 7"DRILL OUT BHA#11 16:00 - 20:30 4.50 CLEAN P OTHCMP RIH WITH BHA#11 ON STANDS FROM DERRICK TO 9500',PU W=190K,SOW=141K 20:30 - 23:30 3.00 CLEAN P OTHCMP DRILL OUT SHOE TRACK -OBTAIN SPRS -PUW=190K,SOW=141K,RWT=160K -TAG DRILL STRINGERS STARTING AT 9586' -BEGIN DRILLING HARD CEMENT AT-9630' -DRILL OUT FLOAT COLLAR AND PLUG -CIRCULATED 20 BBL HIGH VIS SWEEP -DRILL HARD CEMENT TO 9717' 23:30 - 00:00 0.50 CLEAN P OTHCMP CLEANOUT TO 9727', 5'BELOW TOP OF SAND -CIRCULATE BOTTOMS UP -ROTATE AND RECIP PIPE,70 RPM,7 BPM, 850 PSI 10/14/2015 00:00 - 00:30 0.50 CONDHL P OTHCMP CIRCULATE -CIRCULATE BOTTOMS UP -ROTATE AND RECIP PIPE,70 RPM,7 BPM, 940 PSI 00:30 - 01:00 0.50 CLEAN P OTHCMP DRY DRILL ON SAND 9727'-9731' -ROTATE AT 60 RPM -3-5K ON BIT 01:00 - 02:30 1.50 CONDHL P OTHCMP PUMP HI VIS SWEEP -PUH TO 9720' -PUMP 40 BBL SWEEP AT 6 BPM ICP 560 PSI, FCP 2000 PSI AT 9 BPM -ROTATE AND RECIPROCATE FROM 9720'-9647 WHILE PUMPING -MONITOR WELL 10 MINUTES WELL STABLE. 02:30 - 03:00 0.50 CLEAN P OTHCMP POOH -BLOW DOWN TOP DRIVE -POOH F/9720'T/9616' Printed 11/11/2015 4:07:38PM • North America-ALASKA-BP Page 25 of 29 Operation Summary Report Common Well Name:01-13 AFE No Event Type:WORKOVER(WO) Start Date:9/23/2015 End Date:10/17/2015 X4-011FV-E:(4,200,000.00) Project:Prudhoe Bay Site:PB DS 01 Rig Name/No.:DOYON 16 Spud Date/Time:12/5/1977 12:00:00AM Rig Release:10/17/2015 Rig Contractor:DOYON DRILLING INC. UW:500292027000 Active datum:01-13 OKB @73.00usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 03:00 - 04:00 1.00 CLEAN P OTHCMP CUT AND SLIP DRILLING LINE -INSPECT SAVER SUB -INSPECT BRAKES -CUT AND SLIP 74'OF DRILLING LINE -CALIBRATE DEPTH COUNTER -CHECK CROWN SAVER 04:00 - 07:30 3.50 CLEAN P OTHCMP POOH POOH F/9616'T/328' 07:30 - 09:30 2.00 CLEAN P OTHCMP LAY DOWN BHA -MONITOR WELL FOR 10 MINUTES PRIOR TO PULLING NON SHEARABLES THROUGH BOPS,WELL STABLE -STAND BACK DRILL COLLARS -LAY DOWN SHOE TRACK DRILLING BHA -RECOVER 1/2 GALLON OF CEMENT AND METAL 09:30 - 11:00 1.50 CLEAN P OTHCMP PJSM,MU RCJB BHA#12 11:00 - 11:30 0.50 CLEAN P OTHCMP RUN IN ONE STAND 11:30 - 14:00 2.50 CLEAN P OTHCMP PJSM WMTH LRS -PT LINES 250/2500 PSI FOR 5 CHARTED MINUTES-GOOD -PUMP 0.9 BBLS DIESEL INTO OAAT 0.25 BPM TO 1200 PSI -439 PSI BLEED OFF IN 5 MINS,693 PSI IN 10 MINS -PUMP BACK UP TO 1200 PSI -434 PSI BLEED OFF IN 5 MINS,660 PSI IN 10 MINS -BLEED OA TO ZERO -RIG DOWN LRS 14:00 - 18:30 4.50 CLEAN P OTHCMP CONTINUE TO RH-I WITH RCJB BHA#12 TO 9520' -PUW=190K,SOW=140K 18:30 - 19:00 0.50 CLEAN P OTHCMP ROTATED AND RECIPROCATE PIPE ACROSS PACKER SETTING DEPTH FROM 9509'TO 9576' 19:00 - 20:30 1.50 CLEAN P OTHCMP OPEN RCJB -DROP 7/8"BALL -PUMP BALL DOWN AT 5 BPM AND 740 PSI -BALL ON SEAT,PRESSURE INCREASE TO 820 PSI -CONTINUE CIRCULATING,PRESSURE SUDDENLY DROPPED TO 640 PSI AFTER 1 MIN OF BALL BEING ON THE SEAT -ROTATE AND RECIPROCATE PIPE IN ATTEMPT TO GET BALL ON SEAT- UNSUCCESSFUL -CIRCULATE 1 DRILL PIPE VOLUME,NO INCREASE IN PRESSURE -REVERSE CIRCULATE AT 5 BPM FOR 7 BBLS,THEN RE ATTEMPT CIRCULATING THE LONG WAY-UNSUCCESSFUL,PRESSURE REMAINS AT-650 PSI -CONTACT ODE,DECISION MADE TO TAKE A 5'BITE FROM THE SAND AT LOW PUMP RATE THEN POH Printed 11/11/2015 4:07:38PM • • North America-ALASKA-BP Page 26 of 29 Operation Summary Report Common Well Name:01-13 AFE No Event Type:WORKOVER(WO) Start Date:9/23/2015 ' End Date:10/17/2015 X4-011 FV-E:(4,200,000.00) Project:Prudhoe Bay Site:PB DS 01 Rig Name/No.:DOYON 16 Spud Date/Time:12/5/1977 12:00:00AM Rig Release:10/17/2015 Rig Contractor:DOYON DRILLING INC. UWI:500292027000 Active datum:01-13 OKB(g73.00usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 20:30 - 21:00 0.50 CLEAN P OTHCMP RIH AND TAG SAND AT 9731'. -PUW=190K,SOW=140K,RWT=160K AT 40 RPM -ROTATE PIPE WHILE STACKING 5K DOWN ON SAND,PUMPING AT 1 BPM TO 9736' -POH WITH RCJB BHA#12 21:00 - 22:00 1.00 CLEAN P OTHCMP CIRCULATE 1 DRILL STRING VOLUME DUE TO U-TUBING -MONITOR WELL FOR 10 MINUTES,STATIC 22:00 - 00:00 2.00 CLEAN P OTHCMP POH FROM 9412'TO 6045' -PUW=125K,SOW=110K 10/15/2015 00:00 - 02:30 2.50 CLEAN P OTHCMP PTSM.PERFORM SPCC AND EQUIPMENT CHECKS. -CHECK CROWN-O-MATIC.OK. CONTINUE TO POH FROM 6045'TO 327' -MONITOR WELL FOR 10 MINS BEFORE PULLING SHEARABLES THROUGH BOPS- STATIC 02:30 - 05:00 2.50 CLEAN P OTHCMP PJSM,LAY DOWN RCJB BHA#12 -RECOVER 7/8"BALL AND BALL SEAT -RECOVER 4-1/2 GALLONS OF SAND-NO LARGE DEBRIS,SOME METAL FLAKES VISIBLE IN THE SAND 05:00 - 06:00 1.00 CLEAN P OTHCMP BREAK DOWN REMAINING RCJB BHA -CLEAR AND CLEAN RIG FLOOR 06:00 - 07:00 1.00 CLEAN P OTHCMP RIH WITH 4-3/4"DRILL COLLARS TO L/D 1 X 1 TO PIPE SHED. 07:00 - 12:00 5.00 CLEAN P OTHCMP PJSM.M/U HES RBP RUNNING TOOL. -RIH FROM SURFACE TO 8,543'MD.PUW= 159 KLBS,SOW=139 KLBS. LOSSES TO WELL BORE LAST(12)HOURS=0 BBLS. NO SLOW CIRCULATING RATES ON THIS TOUR. 12:00 - 13:30 1.50 CLEAN P OTHCMP PTSM.PERFORM SPCC AND EQUIPMENT CHECKS. -CHECK CROWN-O-MATIC.OK. RIH FROM 8,543'MD TO 9,582'MD.PUW=181 KLBS,SOW=136 KLBS. -ACQUIRE SLOW CIRCULATING RATES. 13:30 - 15:30 2.00 CLEAN P OTHCMP PJSM.DISPLACE WELL TO 8.5 PPG SEAWATER. -WASH SAND AT 5 BPM=660 PSI TO TOP OF RBP AT 9,752'MD. -PUMP 40 BBL HI-VIS SWEEP AT 6 BPM=680 PSI. -DISPLACE WELL TO 8.5 PPG HEATED SEAWATER AT 10 BPM=2,060 PSI. 15:30 - 17:00 1.50 CLEAN P OTHCMP PJSM.PRESSURE TEST 7"LINER. -R/U PRESSURE TESTING EQUIPMENT. -PRESSURE TEST TO 250 PSI LOW FOR(5) MINUTES,3,500 PSI FOR(30)CHARTED MINUTES.PASSES BP TESTING CRITERIA. -APPROVAL TO PROCEED BY WTL KEN SCHNEIDER. -PUMP 5 BBLS TO PRESSURE UP TO 3,500 PSI,BLEED BACK 5 BBLS TO TRIP TANK. Printed 11/11/2015 4:07:38PM • S North America-ALASKA-BP Page 27 of 29 Operation Summary Report Common Well Name:01-13 AFE No Event Type:WORKOVER(WO) Start Date:9/23/2015 End Date:10/17/2015 X4-011FV-E:(4,200,000.00) Project:Prudhoe Bay Site:PB DS 01 Rig Name/No.:DOYON 16 Spud Date/Time:12/5/1977 12:00:00AM Rig Release:10/17/2015 Rig Contractor:DOYON DRILLING INC. UWI:500292027000 Active datum:01-13 OKB @73.00usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 17:00 - 17:30 0.50 CLEAN P OTHCMP R/D TEST EQUIPMENTAND BLOW DOWN ALL SURFACE LINES. 17:30 - 18:30 1.00 CLEAN P OTHCMP ENGAGE AND RELEASE RBP AS PER HES REPRESENTATIVE. -RIH AND ENGAGE RBP,RELEASE RBP. -MONITOR WELL FOR(10)MINUTES.WELL STATIC. 18:30 - 00:00 5.50 CLEAN P OTHCMP PJSM.POOH WITH HES RBP. -POOH FROM 9,752'MD TO 4,210'MD L/D DP TO SHED 1X1. LOSSES TO WELL BORE LAST(12)HOURS=0 BBLS. 10/16/2015 00:00 - 00:30 0.50 CLEAN P OTHCMP PTSM.PERFORM SPCC AND EQUIPMENT CHECKS. -CHECK CROWN-O-MATIC.OK. 00:30 - 07:30 7.00 CLEAN P OTHCMP PJSM.POOH WITH HES RBP. -POOH FROM 4,210'MD TO SURFACE L/D DP TO SHED 1X1. -L/D HES RBP AND RUNNING TOO. -RIH WITH STANDS FROM DERRICK TO 393' MD. -POOH FROM 393'MD TO SURFACE L/D DP TO SHED IX1. 07:30 - 08:30 1.00 BOPSUR P OTHCMP P/U RUNNING TOOL TO PULL WEAR RING. -PULL WEAR RING AND L/D WEAR RING RUNNING TOOL. -CLEAR AND CLEAN RIG FLOOR. 08:30 - 09:30 1.00 BOPSUR P OTHCMP PJSM.R/U TO PRESSURE TEST CASING. -REVIEW PRESSURE CROSS CHECK LIST WITH RIG CREW,ALL CHALLENGE QUESTIONS ANSWERED CORRECTLY. -PRESSURE TEST TO 250 PSI LOW,3,500 PSI HIGH FOR(5)CHARTED MINUTES EACH. GOOD TEST. 09:30 - 11:00 1.50 RUNCOM P RUNCMP R/U 4-1/2"CASING EQUIPMENT ON RIG FLOOR. 11:00 - 12:00 1.00 RUNCOM P RUNCMP PJSM.RIH WITH 4-1/2"12.6#13CR-85 VAMTOP COMPLETION. -BAKER LOK ALL CONNECTIONS BELOW PACKER. -USING TORQUE TURN SERVICES,TORQING EACH CONNECTION TO 4,400 FT-LBS. -USING JET LUBE SEAL GUARD THREAD COMPOUND. -RIH FROM SURFACE TO 144'MD. LOSSES TO WELL BORE LAST(12)HOURS=0 BBLS. NO SLOW CIRCULATING RATES ON THIS TOUR. Printed 11/11/2015 4:07:38PM • North America-ALASKA-BP Page 28 of 29 Operation Summary Report Common Well Name:01-13 AFE No Event Type:WORKOVER(WO) Start Date:9/23/2015 End Date:10/17/2015 X4-011 FV-E:(4,200,000.00) Project:Prudhoe Bay Site:PB DS 01 Rig Name/No.:DOYON 16 Spud Date/Time:12/5/1977 12:00:00AM Rig Release:10/17/2015 Rig Contractor:DOYON DRILLING INC. UWI:500292027000 Active datum:01-13 OKB @73.00usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 12:00 - 00:00 12.00 RUNCOM P RUNCMP PTSM.PERFORM SPCC AND EQUIPMENT CHECKS. -CHECK CROWN-O-MATIC.OK. PJSM.RIH WITH 4-1/2"12.6#13CR-85 VAMTOP COMPLETION. -BAKER LOK ALL CONNECTIONS BELOW PACKER. -USING TORQUE TURN SERVICES,TORQING EACH CONNECTION TO 4,400 FT-LBS. -USING JET LUBE SEAL GUARD THREAD COMPOUND. -RIH FROM 144'MD 7,665'MD. LOSSES TO WELL BORE LAST(12)HOURS=0 BBLS. NO SLOW CIRCULATING RATES ON THIS TOUR. 10/17/2015 00:00 - 00:30 0.50 RUNCOM ` P RUNCMP PTSM.PERFORM SPCC AND EQUIPMENT CHECKS. -CHECK CROWN-O-MATIC.OK. 00:30 - 03:00 2.50 RUNCOM P RUNCMP PJSM.RIH WITH 4-1/2"12.6#13CR-85 VAMTOP COMPLETION. USING TORQUE TURN SERVICES,TORQING EACH CONNECTION TO 4,400 FT-LBS. -USING JET LUBE SEAL GUARD THREAD COMPOUND. -RIH FROM 7,665'MD TO 9,715'MD. 03:00 - 04:00 1.00 RUNCOM P RUNCMP DRAIN BOPE STACK. -M/U LANDING JOINT AND HANGER. -CAMERON REPRESENTATIVE INSPECT HANGER. -LAND HANGER AT 9,738'MD.PUW=150 KLBS,SOW=120 KLBS. -CAMERON RILDS. 04:00 - 04:30 0.50 RUNCOM P RUNCMP L/D LANDING JOINT. -R/U LRS AND PRESSURE TEST LINES TO 250 PSI LOW,3,500 PSI HIGH FOR(5)MINUTES EACH.GOOD TEST. 04:30 - 06:00 1.50 RUNCOM P RUNCMP PJSM.LRS FREEZE PROTECT WELL. -LINE UP TO PUMP DIESEL DOWN IA. -PUMP 85 BBLS OF 6.8 PPG DIESEL AT 4 BPM =1,125 PSI. -SHUT DOWN AND ALLOW DIESEL TO U-TUBE FOR 1 HOUR. 06:00 - 09:00 3.00 RUNCOM P RUNCMP SET TWC. -CAMERON DRY ROD SET TWC. -LRS PRESSURE TEST TWC FROM BELOW TO 250 PSI LOW,3,500 PSI HIGH.GOOD TEST. -DRAIN BOPE STACK. -BLOW DOWN LINES,R/D EQUIPMENT. 09:00 - 12:00 3.00 BOPSUR P RUNCMP PJSM.CHANGE OUT UPPER RAMS TO 3-1/2"X 6"VBR. -OPEN ALL RAMS TO CLEAN AND INSPECT. LOSSES TO WELL BORE LAST(12)HOURS=0 BBLS. NO SLOW CIRCULATING RATES ON THIS TOUR. Printed 11/11/2015 4:07:38PM • • North America-ALASKA-BP Page 29 of 29 Operation Summary Report Common Well Name:01-13 AFE No Event Type:WORKOVER(WO) Start Date:9/23/2015 End Date:10/17/2015 X4-011FV-E:(4,200,000.00) Project:Prudhoe Bay Site:PB OS 01 Rig Name/No.:DOYON 16 Spud Date/Time:12/5/1977 12:00:00AM Rig Release:10/17/2015 Rig Contractor:DOYON DRILLING INC. UM:500292027000 Active datum:01-13 OKB c73.00usft(above Mean Sea Level) • Date From-To Hrs 1 Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 12:00 - 14:30 2.50 BOPSUR P RUNCMP PTSM.PERFORM SPCC AND EQUIPMENT CHECKS. PJSM.CONTINUE TO CLEAN AND INSPECT RAM CAVITIES. 14:30 - 16:00 1.50 BOPSUR P RUNCMP BLEED DOWN ACCUMULATOR AND N/D BOPE. 16:00 - 18:30 2.50 WHSUR P RUNCMP N/U 13-5/8"X4-1/16"5M ADAPTER FLANGE. -CAMERON TEST VOID TO 260 PSI LOW, 5,000 PSI HIGH FOR(30)CHARTED MINUTES. PASSES BP TEST CRITERIA 18:30 - 19:30 1.00 WHSUR P RUNCMP N/U 4-1/16"5M DRY HOLE TREE. 19:30 - 20:00 0.50 WHSUR P RUNCMP PRESSURE TEST TREE TO 250 PSI LOW, 5,000 PSI HIGH FOR(5)MINUTES.GOOD TEST. 20:00 - 21:00 1.00 RIGD P RUNCMP SECURE TREE AND CELLAR AREA -PULL RIG OFF DS01-13,WSLAND TOURPUSHER PRESENT.PAD OPERATOR NOTIFIED. -OA=0 PSI,IA=0 PSI,TBG=0 PSI. RELEASE DOYON 16 RIG AT 21:00 HRS ON 10/17/2015. Printed 11/11/2015 4:07:38PM • • 01-13, Well History (Post-Rig Workover) ACTIVITYDATE ►t'��" T/II/O=TWC/0/0. Removed Dryhole Temp#97 . Installed 4" CIW Upper Tree. Torqued and PT'd to API specs. (PASS) Pulled TWC#295 @135"Through tree. Installed tree cap and PT'd to 500 Psi. (PASS) Removed IA PB#95 . and Int. off OA. Installed Blinds and Torqued and PT'd to API specs. (PASS). RDMO. ***Job Complete*** Final WHP's 0/0/0. 10/19/2015 Tree and wellbore are fluid packed. Installed AFE Signs. T/I/O - 0/10/0 Assist Slickline (POST RIG) MITT PASSED to 3500 psi. (set packer)/ MIT IA PASSED to 3500 psi. Circ out well with 10 bbls neat meth and 350 bbls of 120 * F 2% KCL w/MI KI-3869 corrosion Inhib. followed by 5 bbls of meth and 85 bbls of 80*diesel . U Tubed TxIA for 1 hour to freeze protect w/diesel. Pump 5 bbls of diesel down tubing to back flush RHC-M located in XN nip.MIT-T TO 3500 PASSED MIT-IA TO 3500 PASSED pumped 1,9 bbls dsl on each to reach test ptressure bleed pressure off well rig down 10/26/2015 (slickline on well has control annulus valves open togauges) FWEHP=27/24/0 ***WELL S/I UPON ARRIVAL***(post rwo) LRS CIRC WELL(IA/TBG)W/2% BRINE @ 120 DEGREES LRS FREEZE PROTECTED TBG & !AIM DIESEL. DEPLOY BALL& ROD TO LAND IN RHC BODY @ 9,679' MD. LRS PERFORM PASSING MIT-T(3500psi) & PASSING MIT-IA(2500psi) 10/26/2015 ***CONT JOB ON 10/27/15 WSR*** ***CONT JOB FROM 10/26/15 WSR***(post rwo) PULLED BALL& ROD FROM 9,663' SLM. PULLED BK-DGLV FROM ST#6 @ 6,358' SLM/6,379' MD. PULLED BK-DGLV FROM ST#8 @ 3,715' SLM/3,736' MD. SET BK-LGLV IN ST#8 @ 3,715' SLM/3,736' MD. SET BK-OGLV IN ST#6 @ 6,358' SLM/6,379' MD. PULLED RHC BODY FROM XN-NIP @ 9,669' SLM/9,685' MD. TAGGED STICKY PBTD 10,075' SLM W/ 10'x 3-3/8" DUMMY GUN, 2.5"S. BAILER. 10/27/2015 ***WELL S/I ON DEPARTURE, DSO NOTIFIED*** CTU#6 1.75" CT Job Objective: Mill Cement down to Liner Wiper Plug MIRU. MU 3.70"4-bladed junk mill and RIH. Tag down at 10103'. Mill through cement stringer down to 10120', no motor work seen. Offline with pump and dry drift down to 10170' before tagging down again. Continue to mill down to 10226'and begin stacking —7k down with minimal motor work (see log for details). Stalled once at same depth, suspected liner wiper plug. Pump gel pill and chase OOH. FP well down to 2500'w/60/40 10/28/2015 methanol. RDMO. ***WELL S/I UPON ARRIVAL*** (SLB ELINE - PERF) INITIAL T/I/O =0/0/0 PSI RU PT. STAND-BY FOR MAN BASKET TO ARRIVE. RUN 1: RIH WITH 3-3/8" GUN. PERFORATE INTERVAL 10154' - 10169', CCL TO TOP SHOT= 8.75', CCL STOP DEPTH = 10145.25' DRIFT EXPIRED GUN THROUGH 2ND PERFORATION INTERVAL. SAT DOWN AT 10216'. LOG JEWELRY PASS FROM TD to 300' RUN 2: RIH WITH 3-3/8" GUN. PERFORATE INTERVAL 10179' - 10194', CCL TO TOP SHOT =8.75', CCL STOP DEPTH = 10170.25' CORRELATED TO SLB COMPENSATED NEUTRON-FORMATION DENSITY LOG DATED 23-DEC-1977. API SPECIFICATIONS: POWERJET NOVA HMX 3406/6SPF/60 DEG PHASE/ ENTERANCE HOLE =0.4"/ PENETRATION =42.9" 11/1/2015 FINAL T/I/O = 0/0/0 PSI • 0 NS 1 as w co 0 \ 2 ( o - » /o \ / \ \ -0 / / ) cocp § ) § k 0 0 x oxo x O. \ ) a - \ © CO ® \ ) M 0 ( .6 \ / $ { ) } f ) § k e = ci e o co co E / co \ k } , / CO ® _d \ - \ § k ) S \ - Cƒ\ \ . / z , E a ® / cok7 \ - / 3 } \ } / EC - « 0 « co \ \ He .(.,1> ~a. ~ I E CO j k CU < _ > } o � k \ ° J / / m . ! J_! § I \12< 0 \ \ j ) 7 } co ; § - - \ - - ■ 2 \ K / § . ƒ / ) E < ■ , % A / & f / \ - o ` ± » vi- Z ± ) 0 -61 § 3 \ .. \ ƒ \ 2 m k ® ƒ \ ° R / CO m \ ƒ ) co _ a & }' \ \ ) ° \ m = ccx ) ( a Ha) e z .r;) z { \ / \ o e $ z Y m 0 § \ — k \ < ƒ 0 0 0 ° w ) / < , z \ < j [ « c 0 CL > 0 & up z _ LU CU 2 - , _ ) § \ \ e 1 / \ p E o � 0 = 2 w Hi 7: 6 E) / § § § ƒ ƒ E z uj p \ di I \ § § ( / / \ f ƒ E � \ j ( ƒ / u .21 ! & k ) a) $ k \ \ \ { { • \ a \ ra ° z G &/ 0 = \ 0 0 / } / ) \ ) / co 0 } 0 o o o \ o • • � j / j ( / \ - § a fa \ � 2 \ a) al 4 $ / 42y kEU 0 ) f3 Z a 1- I — E G ,- e = Z _ - 2 / }I ' . } z kcc a) ) C ƒ .' \\X \ \ 11 io: $ { ' E e Li, : - Fi E ± Z Z _ - » E) z $ \ \ \ � � $ i E. \ / J asco / 0 _ } \ ` a e _& t ) ) — \ J � � � / / z — \ c k k � a 0 \ \ \ j 0 % e � r > - - k © / ( f } f ` 2 z ƒ \ = z z j \ a 2 } . 2 o E / E j = a. \ - a \ / ] ) / y o eo. / \ ƒ o \ D } / 2 � § \ eE >- 2... / ) \ k = E -. , / § _ ±� / \ \ f / .\ = 4 \i ) ƒ { / � � \ / fkz \ / a = � 3 / f $ / a £ §2 \ N 2 a — 2 E z z 1322 2 2 N.: \ N/ / f y — } \ ; Lj ° = 2 / & 2 o �)/£ ƒ/o \ a = z) > \ // ° cii a & » — \ 40 _ z \ z z \ , ) / { . E Cl) \ ro » & ® k { \ El ( \ ( § 711 lir o - ° « co E /} z ° E o / § 0 _ ,-- co a o f § >-eq ] k II) ):- \ a } ~ o � a- / } \ ( � \ • } / \ 0 0 J 3 » o a_ ± / D / c LU ! ( * 2 e 2 K \ a. II) A 0 5 = 3 § 2 ( 2 co • s 0 a)m O W ao J c O El UJ = p N C ry 'LIW O G _ O) W a cn = O 0 C o mw Oa, o > ao LU U U 0C CC t.2Q Y CN W •N v E E a m m Q m a N 0 e r ° -,7, C7 0 o C7 o O zz Z . W O _°. -p -O U O O O O O O u O O O O O N r-- 0 = j j 5 N LO N O O O y co O O O .. vi O C1 0 m 0 F E -O N m N Ci O = .- O > N �_ CO a) N N �. C y y N E 1.-- O c 0 .2 o W E W N C a1W E p O a j W O ❑ H 2 oO W cn Q X c ›- CO a m .a c �° C •O 0) o a E C J '.8a N U in ❑ d ug o o >- ,o J p M O N O n N N C a O J Q CO N N O -c".1 > ) t +W U) ,,.) - Z. N 0 ❑ Q. C C C O. DC ) C Q U) O W ' O O c n vi w > 5 cc jj : 04 oO _O. f6 7 Q j E E t7 a) a) G' p LL O QV aa)r ' com Q) )O Z po a N O .1 N v) m a m p U) co a n O N .. O O ai IN CO O z E " U c0 o m ❑ a) N O) 0 V' m O) 03 a! co E a) a 0 ai C 112) Y rn r) U U U) U) a Q O n' a) »>j n a E 15 C C HT H N > O W z w i1N c N Q Z U) U 5 H ❑ C7 Q an O O H W O w J m z ❑ u. 0 W a a Q U) Q ❑ W 0 U CC i a Z CO Z co o0 • (7) W m W CD y a aZ V Z W U• YW> YO) am O o= WU wQ oO O 0 U Q 2 Wo IHz CO OW W atO QM J J Z naJ U) H U a .- 5 a) O >a ' W N N > p o W cn ai W,O Z o E 2 z E co o _ m a) m o o 0} N a c •m .. E m Z O r ?� O o a H )) v O N E a) m bj 2 a .. N o cn E E S •d• a E U o a F u c ai V > H n' E a N ai v) m m �n n c c o o) o a >, ai o n E d c ,Z, C a) E 2 Z H y > > >, O r` O r E. E o E E a) m :o ?. o co H u) r O a O > O U n -O a) -O N V co O CD r 0 O_ W 0 7 'O U U a Lt a' 7 O N •) O Ti) ❑ ❑ ❑ ❑ ❑ ❑ LL U) a } cn 0 2 C7 • • 13 ) , & of N o 01 \ ± k co/_ > t j /� L co 2 C H2 W ) / } yA Co0 4 ) } -52y CO § @ 0 0 0 \ 0 0 2 » ,co / { 0 _ _ 23 6 � � \ k = 0 o0 co CO » \ / / ® ,2 co z, z z E k § k ) u .. % .. { .. ƒ r] w § ` 3 J } < $ y -t-, _ \ — - CO ul I— _ 6 � = \ / w / ( ® -7a 2} » \k � \ j / § . i j > .. ) 17.3 \ \ o R /\ / o , { \ O. IX2 io ® > 27 & ■ / ) ( / / ` ) ) \ ± j / q } _ # 0 4 I _ t / E , .E 0 Q CO - \ ( E E £ 0 - <E co \ o. \ } . a ( \ \ F- a § \ \ \ \ \ R . _ Co Cis 20 � 0 u § _ - Co- -o »e � k { — 2 a a / _ _ / » / CO 2 » CO z ) . /_ £ m = E < e O « « &2 / .0 ] 55 7 ) E E H i / > > » \ H ` .,%, / , 0 2 \ / 0 0 <11 ) 0 ct w \ ~ co 2 - ( \ \ } a 6 +^ / < _ _ Q ae ® » a ) § L — 2 o \ // ° - _ ) & & ill ` 0 \ ) _ CO ƒ H Cl) _ ) o E 2 $ ) | H / co -co } > E, / ( \ § § ° / 2 ) \ o 2, V) S \ \,) \ N ., a E a N- 123 ) } w \ § | . gi 2 a w _ / I- 0 \ / ) / CO / Co a Co / e LO Co .— ( ) J G & a G = E 2 / / ] \ 2 \ / o \ j Cl) ® / ƒ • • cn46ca o NI NI TSoƒ \1 0 \ \ § _cv e E} di z 12 { k12 � ƒ \ $ $ e 1 f E - z z \ / \ \ \ % z § fa • i , § a, _ R \ \ - 0 CO ©O. � � \ \ t } III 2 \ � \ � ■ , e = \ o k 3 $ f k 0 § � © y [ / • • ) \ 0 j ) / j \ ƒ } / / j \ � E § r = mJ ; = e N- « 0 0 = 5 k ! { U ; ( 3 % CC _ _ ( / § \ O { } k E n k f \ / ƒ' ) } \ co 1 z t / ƒ 3 [ ) f = z 0 C .2 oI g .7) _ _ z . « \e %A , |\ f A Cn / !\ \ ) / .-- 0 81' J § - \ z . § f § $ ) { } � o > � / k ®,\ ) ) e \ .. # 2f & +; - § ( § X § ƒ 2 k [ _ o 2 : & , o § ± G = \ j 0 0 « 3 0 3 $ 3 TRIS 41/16°qW WELLHEAD= GRAY/McEVOY O 1 —1 3 siiy NOTES: ***CHROME TBG&SCAB LHR'** ACTUATOR= OKB.H_EV= 73' +' ■ 74, I BF.ELEV= ? ' 2218' -14-1/2"t ES X NP,D=3.813" KOP= 3184' Max Angle= 41'@ 5700'' 20'CONDUCTOR, - 112' Datum M34= 10088' 91.5#,14-40, IP.iik4,. 2457' H9-5/8"F.O CEMENTER Datum TVD= 8800'SS D=19.124" F. 9-5/8'CSG STUB(10/2015) -i 2360' GAS UFT MANDRELS 9-5/8"CSG,47#,J&L-95-SOFT XO TO N-80 BUTT 2478' ST MD TVD DEV TYPE VLV LATCH PORT GATE 8 3736 3711 23 KG8.-2 DONE BK 16 10/27/15 13-3/8"CSG,72#,N-80 BUTT,D=12.347" 2726' E to"' ar pki 116 7 5719 5326 41 KGB-2 DMY BK 0 10/17/15 6 6379 5831 39 KGB-2 SO BK 20 10/27/15 5 6996 6313 39 KGB-2 DMY BK 0 10/17/15 9-518"CSG,47#,N-80 BUTT 7759' 4 7655 6832 37 KG13-2 DMY BK 0 10/17/15 XO TO J&L 95-95-HARD ` 3 8270 7325 36 KGB-2 DMY BK 0 10/17/15 2 8888 7836 32 KGB-2 DMY BK 0 10/17/15 Minimum ID =3.725"@ 9685' 1 9422 8295 30 KGB-2 DMY BK 0 10/17/15 4-1/2" HES XN NIPPLE . ' '70 9501' 14-1/2"HES X NP,D=3.813" ' ihd 9532 -17"X 4-117 HES TNT PKR,D- -3.865" TOP OF 4-112"SCAB LNR - 9701' A Ir. , 9572' H4-112"HES X NP,D=3.813" 7'SCAB LHR,26#,L-80 VAM TOP HC -I 9709' ' I ittii .0383 bpf,D=6.276" ' 9685' -14-1/2"t S XN MP,D=3.725" 4-112"TBG,12.6#,13CR-85 VAM TOP, 9744' PbA tir .0152 bpf,ID=3.958" 9701' _-9-5/8"X 7"BRK 2RH ZXP LPT WI FLEXLOCK �y le HGR,D=6.170" P�FORATION Silk/MARY :r REFLOG: DESEU10.6 CaC ON12123/77 9744' -I4-1/2"WLEG,D=3.958" ANGLE AT TOP PERF: 30°@ 10154' ' -i ELM)NOT LOGGED Note:Refer to Roduction DB for historical perf data 9771' -17"X 4-1/2"XO,D=3.958" SIZE SW INTER'VAL Opn/Sgz SHOT CO7 mit 3-1/8" 4 10100-10130 S 07/05/82 06/21/88 - 3-1/8" 4 10150-10180 S 07/05/82 06/21/88 pg4,0 11, 4 10150-10200 S 07/11/88 09/25/92 4 10154-10164 S 10/12/92 10/05/15 !401P. 3-3/8' 6 10154-10169 0 11/01/15 lk, ♦ - 4 10160-10177 S 02/07/93 10/05/15 i ‘., , 1111 4 10177-10194 S 10/12/92 10/05/15 f 3-3/8" 6 10179-10194 0 11/01/15 :f 3.3/8" 4 10180-10200 S 05/17/82 06/21/88 I tdc10226'CTM -COL MLLED FROM 10170'CTM TO 4 10180-10200 S 07/11/98 09/25/92 '' 10226'CTM-UNCORRECTED DEPTHS 8 10187-10193 S 08/16/94 10/05/15 (10/28/15) 3-3/8' 2 10236-10256 S 07/18/92 09/25/92 2-7/8" 4 10448-10488 S 04/29/78 05/15/82 _.°4...*.* 1 * 2-7/8" 4 10498-10515 S 04/29/78 05/15/82 4; 10256' -{TOP OF CEMENT(10/03/15) 2-7/8" 4 10529-10557 S 04/29/78 05/15/82 2-7/8" 4 10571-10629 S 04/29178 05/15/82 ?i.:. 4 ' 10410'CTM H9-518'BP(12/05/87) 4-1/2"LNR,12.6#,13CR 80 VAM TOP, -I 10251' 111 .0152 bpf,ID=3.958" PBTD -I TBD ,11/11/1/11111111/1111 9-5/8'CSG,47#,J&L 95 HARD, 10735' 1111111111111111111111 •11111111111 10740' -I TD .0733 bpf, ID=8.681" DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY INT 01/02/78 RWN 35 IMTIAL COMPLETION 10/22/15 SMMrTLH FINAL ODE APFROVAL WELL: 01-13 04/01/99 N9E5 RWO 11/17/15 RCT/JMD GLV CIO(10/27/15) PERAAT No:'1770590 10121/15 D-16 RWO 11/17/15 I I RIJMD'COL WILLED CMT(10/27/15) AFI No: 50-029-20270-00 07/23/15 PJC BUILT PROPOSAL 11/17/15 METDJMD ADPERFS(11/01/15) SEC 8,T10N,R15E,662'FNL&733'FWL 08/017 1SAANc/PJC UPDATE 9-5/8"STUB 10/16/15 JMD CREATED REDLINE FOR RIG PER TALLES BP Exploration(Alaska) of Tlit • (,..-- Alaskail ��7, s. THE STATE Oil and Gas ,,.s �, of T As KA Conservation Commission s i ____.�j 333 West Seventh Avenue ,.oret GOVERNOR BILL WALKER Anchorage, Alaska 99501-3572 F Main 907 279 1433 ALASI1J' Iu; i /iJl,,' Fax 907.276 7542 SCOc`-� www.aogcc.alaska.gov Dave Bjork I QSQ Engineering Team Leader 1 BP Exploration (Alaska), Inc. P.O. Box 196612 Anchorage, AK 99519-6612 Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, PBU 01-13 Sundry Number: 315-393 Dear Mr. Bjork: Enclosed is the approved application for sundry approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the AOGCC grants for good cause shown, a person affected by it may file with the AOGCC an application for reconsideration. A request for reconsideration is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. Sincerely, ''..0 Cathy . Foerster ,, Chair DATED this iday of July, 2015 Encl. . STATE OF ALASKA t ALA—,A OIL AND GAS CONSERVATION COMMISSION t.'-a'It:.!t t14;' E APPLICATION FOR SUNDRY APPROVAL ,JUN �/2 3l<S 20 AAC 25.280 1 Type of Request: f--y i,„, ❑Abandon El 'Plug for Redrill 0 Perforate New Pool 0 Repair Well 0 Change Apprdveo'J•-t farti•'Y,.' ❑Suspend 0 Plug Perforations. 0 Perforate . ® Pull Tubing 0 Time Extension 1 El Operations Shutdown 0 Re-Enter Suspended Well 0 Stimulate ®Alter Casing 0 Other Scab Liner Ate-(,yyQ,w1 04 2 Operator Name 4 Current Well Class 5. Permit To Drill Number BP Exploration (Alaska) Inc. 177-059 • 3. Address: 0Exploratory ID _ Alaska 99519 6612 ® Development ❑Service P.O. Box 196612,Anchorage, 6. API Number 50.029-20270-00-00. 7 If perforating: 8. Well Name and Number: What Regulation or Conservation Order governs well spacing in this pool? PBU 01-13 Will planned perforations require a Spacing Exception? 0YesN 9. Property Designatior 10 Field I Pool(s): ADL 028329 • Prudhoe Bay/Prudhoe Bay• 11. PRESENT WELL CONDITION SUMMARY Total Depth MD(ft). Total Depth TVD(ft): Effective Depth MD(ft) 'Effective Depth TVD (ft): Plugs(measured): Junk(measured) 10740' . 9433' - 10693' 9392' 9549' 10122', 10164' Casing Length Size MD TVD Burst Collapse Structural Conductor 80' 20" 35- 115' 35'- 115' 1530 520 Surface 2694' 13-3/8" 34'-2728' 34'-2728' 4930 2670 Intermediate Production 10706' 9-5/8" 32'- 10738' 32'-9431' Liner Perforation Depth MD(ft). Perforation Depth TVD(ft): Tubing Size: Tubing Grade. Tubing MD(ft) 10154'- 10193' 8930'-8964' 5-1/2", 17#x 4-1/2", 12.6# 13Cr80 9604' Packers and SSSV Type 9-5/8"x 5-1/2" Baker S-3 Packer Packers and SSSV 9599'/8449' MD(ft)and TVD(ft): 12. Attachments: 13 Well Class after proposed work: ®Description Summary of Proposal 0 BOP Sketch - 0 Detailed Operations Program 0 Exploratory 0 Stratigraphic 0 Development 0 Service 14. Estimated Date for 15 Well Status after proposed work: Commencing Operation September 1,2015 • 0 Oil ❑WINJ 0 WDSPL ❑Plugged 16 Verbal Approval. Date 0 Gas ❑GINJ 0 GSTOR 0 Abandoned Commission Representative: 0 WAG 0 SPLUG 0 Suspended 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact: Sean McLaughlin,564-4387 Printed Name Dave Bjork Title. Engineering Team Leader Email: Sean.McLaughlin@bp.com Signature: `� �/�� �/ Phone: 564-5683 Date: cex,As �G� Commission Use Only Conditions of approval Notify Commission so that a representative may witness Sundry Number: 5`5. S C1 El Plug Integrity BOP Test ❑Mechanical Integrity Test 1:1 Location Clearance 1 l Other • 30p te$ f fd 354, 0 psi• (/27P5P / S 23Pj7p5 l i 41'71'1uJC7r prc vt ft,- tC5f -Fr, .2Sb0 p Spacing Exception Required? ❑Yes 'No Subsequent Form Required: .0 _ A Q 4- APPROVED BY Approved By: - P Ak.,AA, COMMISSIONER THE COMMISSION Date 7— /3.--1,-S Form 10-403 Revised 0/2012 Approved a lication is valid for PProyal Submit In Duplicate _"T . 7 // b/ 1 \plp� eRieihNatAf / G- 3- /RBDMS-M AUL 1 5 7015 bp Sundry Request for Casing and Liner Repair Well: 01-13 Date: 06/11/2015 Engineer: Sean McLaughlin MASP: 2387 psi Well Type: Producer Estimated Start date: September 2015 History: Well 01-13 was drilled in Jan 1978 as a water supply well and perforated in Zone 1 and 2. In 1982 the well was converted to an oil producer-all perfs were squeezed and upper Zone 4 perfs were added. The well continued to be a fulltime producer until 1999 when the well was worked over for parted tubing. Post RWO the well started seeing elevated pressures in the OA(over 1000 psi). The OA would be bleed down and the next day the pressure would back. These elevated OA pressures were sustained for about 6 months. The pressure would slowly build up, however was manageable by bleeds so the well continued to be a fulltime producer. The well failed its first MIT-OA in 2004 and after failing a MIT-TxIAxOA, but passing a CMIT-TxIA an OA squeeze with gelled diesel was pumped. During troubleshooting the IA prior to the squeeze it was noted that the OA FL was staying @ — 500' © a different pressures. The OA quit building to higher pressures after the OA and IA were bleed to 0 signifying the pressure in the OA may have possibly been from the IA. In 2006 Slickline observed a tight spot deep in the 9-5/8" casing in and were able to tap past, however when they were PUH they lost spang action and ended up dropping a cutter bar while attempting to FISH out the toolstring they became stuck again and dropped another cutter bar. A video log observed a split in the liner @ 10,124' and severe liner damage @ 10,134'. Approximately 3 months after the well was put on gas lift, neighbouring wells started to see glaciation in their cellars. The glaciation continued for 3 months until gas bubbling was observed in well 33's cellar(1 well over on the same row). An investigation was performed on all of the wells in the area and well 13 was determined to be the source of the gas. The gas was making its way through thread leaks of the 9-5/8", into the OA and through a hole in OA @—460' and into the ground. Scope of Work: Decomplete well. Repair liner and casing with fully cemented scab liner and tieback. Recomplete well. Pre Rig Prep Work: S I Drift for Jet cutter. E 2 Jet cut the 5-1/2" tubing at 9566' MD. This is —10' from top of the Baker RBP and —10' above a 5-1/2"connection. (Reference tubing summary 4/1/99). F 3 CMIT-TxIA to 1,200 psi. F 4 Circulate well with seawater and Diesel F/P to 2500'. Bleed TBG to—200 psi W 5 Check the tubing hanger lock down screws for free movement. Completely back out and check each lock down screw for breakage(check one at a time). PPPOT-T& IC. V 6 Set TWC,ND Tree,NU Dry Hole Tree, PB I/A&upper 0/A valves F 7 Bleed WHP(s)to zero W 8 Excavate the cellar as needed to get top of spray-in liner below the starting head. Line the cellar around the wellhead with impermeable, Rhino lined Herculite. Proposed RWO Procedure: • MIRU Rig. ND tree. NU and test BOPE with four preventers configured top down (annular, 9-5/8" fixed, blind shears, mud cross and 3-1/2" x 6"VBR's). • Pull 5-W 13Cr tubing from —9,566' MD. • Mill and retrieve packer from 9,586'. • Cleanout 9-5/8" production casing to 10,360'. • Run and cement 4-1/2" 13Cr condition B scab liner from 10,360' to 9,700' with 55 bbls of 15.8 ppg class G cement. • Set 7" RBP in TOL and test to 3500 psi. Cover with 50 of sand. • Log 9-5/8" casing to determine top of cement in the OA. • Cut and pull 9-5/8" casing. • Nipple down BOPE and set back. Cut off old wellhead and set landing ring on 20" conductor. • Run and fully cement 7" casing tie-back to surface with 490 bbls of 15.8 ppg class G cement. • Install 7" sliplock wellhead. Nipple up BOPE equipment and test breaks. • Pressure test the casing to 3500 psi. • Drill out 7" shoetract and cleanout with RCJB. • Recover 7" RBP. • Run 4-W 12.6# 13Cr-85 VamTop tubing with HES TNT packer. • Displace the IA to packer fluid and set the packer. • Test tubing and IA to 3,500-psi. Freeze protect to 2,200' MD. • Set TWC. ND BOPE. NU and test tree. RDMO. Post ri Work ✓ 1 Pull TWC S 2 Pull ball and Rod, Pull RHC seat, Install GLV's E 3 Perforate per PE (tentative perforation depths 10,154' -10,194') TREE_ , FPC-120 — WELLF EAD= GRAY 01 -13 S. Y NOTES: ***CHROME TBG"' 'ACTUATOR= BAKER C OKB.ELEV= 73' I 2173' —{ 1/r Hes X NP,D=4.562' BF.ELEV= ? KOP= 3184' Max Angle= 41'@ 5700' 20'COPDIK'TOR, H 112' Datum MD= 10088' 91.5#,H-40, — .../f 2334' H 9-5/8'F.O CENBJTER Datum TVD= 8800 SS D=19.124' X 2457' —9-5/8"F.O CEMENTER 9-5/8'CSG,47#,J8L-95-SOFT XO TO N-80 BUTT —I 2478' L 13-3/8'CSG,72#,N-80 BUTT,D=12.347' -1 2726' GAS LFT MANDRELS Minimum ID =3.813"@ 9621' ST PA) TVD DEV TY FE VLV LATCH FORT DATE 4-1/2" HES X NIPPLE 1 3756 3729 23 LB DMY 12 0 04/01/14 X X 2 6263 5742 39 LB DMY T2 0 04/01/14 3 8098 7186 36 LB DMY T2 0 04/01/14 9-5/8'CSG,47#,N-80 BUTT -1 7759' 17 4 9068 7989 31 LB DMY 12 0 04/01/14 XO TO J&L 95-95-HARD 9649' H5-12-BKR RPB PLUG(04/01/14) Z 9586' —19-5/8'X 5-12"BKR S-3 PKR,D=4.750" . 5-1/2'TBG, 17#,13CR NSCC, - 9591' i .0232 bpf,D=4.892' } 9591' —15-1/2-X 4-1/2'XO,D=1937" 9622' -14-112FEB XNP,13=3.813" 4-1/2'TBG,12.6#,13CRNSCT, H 9644' 9644' H4-1/2'WLEG,D=4.00" .0152 bpf,I)=3.958" 9619' --I E LMD TT LOGGED ON XX/XX/XX I PERFORATION SUMMARY REF LOG: DESEU10.6 CaC ON 1223/77 10134' ELMD SEV ERE LNR DAMAGE ANGLE AT TOP PERF: 30"Q 10154' (V DEO LOG 01/28/07) Note:Refer to Production DB for historical perf data ) 10122' SLM —FSH(SL TOOLSTRPIG-30'TOTAL LENGTH 8 SEE SPF IITBNAL Opn/Sqz SHOT SQZ J 2 CUT7St BARS-30'w/1.75'FN(07/26/06) 3-1/8' 4 10100-10130 S 07/05/82 06/21/88 3-1/8' 4 10150-10180 S 07/05/82 06/21/88 4 10150-10200 S 07/11/88 09/25/92 e 7 10164' —FSH(6'BP Ei R 'J T 8 1"STFFENER 4 10154-10164 0 10/12/92 RNG(03/31/06) 4 10160-10177 0 02/07/93 — 4 10177-10194 0 10/12/92 3-3/8' 4 10180-10200 S 05/17/82 06/21/88 4 10180-10200 S 07/11/98 09/25/92 8 10187-10193 0 08/16/94 3-3/8" 2 10236-10256 S 07/18/92 09/25/92 VAVAVAVAVAVAVAVAVAVA 10210' --I TOP OF CBENT(0925/92) 2-7/8' 4 10448-10488 S 042 � 9178 05/15/82 �./.......4cc. . 2-7/8" 4 10498-10515 S 0429178 05/15/82 .�.�.�.�.�.�.�.�.1.1 2-7/8" 4 10529-10557 S 04/29178 05/15/82 �•�•�•�•�•�•�•�•�••• 10410'CTM H9-5/8-BP(12/05/87) 2-7/8' 4 10571-10629 S 0429/78 05/15/82 I PBTD H 10693' 9-5/8'CSG,47#,J8L 95 HARD, —1 10735' 1�.4.4.4.�4�.�44.4.4.1 .0733 bpf. D=8.681' 10740' TD DATE REV BY COMMENTS DATE REV BY COM& NTS PRaDHOE BAY UNIT 01/02/78 IRINN 35 IMTIAL COMPLETION 04/07/14 PJC PSRFORATDN CORRECTIONS VVBL: 01-13 04/01/99 N9E5 INVO 06/17/15 PJC LNR/CSG/TBG 03RRECT1ONS F RMT No:'1770590 05/10/13 C)NJMD GLV CIO(04/28/13) 06/18/15 TR/JMD CONDUCTOR DEPTH EDIT AR No: 50-029-20270-00 10/25/13 VVECIJMD GLV C/O(10/09/13) SEC 8,T10N,R15E,662'FM_8 733'FIM_ 04/07/14 DW/PJC LNR DAMAGE(VIDEO 1/28/07) 04/07/14 DVWPJC SET FOP PLUG/GLV C/O(04/01/14) BP Exploration(Alaska) TREE _HEAD= 120 01 -13VVELLGRAY SAi- I Y NOTES: ***CHROME TBG*** ACTUATOR= BAKER Proposed RWO OKB. B_EV= 73' P BF.ELEV= KOP= 3184' ... 4 Max Angle= 41°@ 5700' k °, Datum M3= 10088' ' "'Datum TVD= 8800'SS ) I •" I 2,200' H4-11 °x'NIP,ID=3.812" 4 13-3/8"CSG,72#,N-80, 13=12.347" H 2725' 1 ti • a 'M H 1 1 9,519' H4-1/2"'X'NIP,ID=3.812" 7"26#L-80 VamTopHC 4:gl ►1.". —7"X4-1/2"HES'TNT F KR ] 1 ... 9,584' H4-112"'X'NIP,ID=3.812" 9,656' I--I4-1/2"'XN NIP, ID=3.725" 4-1/2"TBG,12.6#,13Cr-85 VamTop H 1,705' - ;:' r -' 9,705' H 4-1/2"WLE; 4-1/2"12.6 13GY LamerH 10,360' 9,700' -19-s/8"X 4-1/2"LINERTOP . FERFORATION SUMUARY REF LOG: DIESEU10.6 CaC ON 12/23/77 ANGLE AT TOP FERF: 30"@ 10154' .7.c. .:.` Note:Refer to Production DB for historical perf data 1 SIZE SFF INTERVAL Opn/Sqz SHOT SQZ 3-1/8" 4 10100-10130 S 07/05/82 06/21/887", 3-1/8" 4 10150-10180 S 07/05/82 06/21/88 Olt 4 10150-10200 S 07/11/88 09/25/92 , --ti4 10154 10164 O 10/12/92 } *V 4 10160-10177 0 02/07/93 .�`� 4 10177-10194 0 10/12/92 .viii ° 3-3/8" 4 10180-10200 S 05/17/82 06/21/88 ,it1, 4 10180-10200 S 07/11/98 09/25/92r 8 10187-10193 0 08/16/94 '",',V.;•.: �a .. 3-3/8" 2 10236-10256 S 07/18/92 09/25/92 ., :,,,,,,s 2-7/8" 4 10448-10488 S 04/29/78 05/15/82 ., r ,,1,1 ,, 1 �, ,,1', 2-7/8" 4 10498-10515 S 04/29/78 05/15/82 /1 2-7/8" 4 10529-10557 S 04/29/78 05/15/82 '1111111111111111111,1 •••• 2-7/8" 4 10571 -10629 S 04/29/78 05/15/82 10410'CTM —19-5/8"BP(12/05/87) FBTD H 10693' 1111111111 111111111111111111111, 9-5/8"CSG,47#,N-80,.0733 bpf, 13=8.681" H 10735' 111111111111111111111, it•i•i/i•i•i•i4,i4d TD — 10740' CIATE REV BY COMMBVTS DATE REV BY COMMENTS PRUDHOE BAY UNIT 01/02/78 INITIAL COMPLETION 05/10/13 CJN/JMD GLV C/O(04/28/13) WELL. 01-13 04/01/99 N9ES RWO 10/25/13 WEGJMD GLV C/O(10/09/13) PE MT No:'1770590 03/09/06 KSB/PAG GLV C/O 04/07/14 DW/PJC LNR DAMAGE(VIDEO 1/28/07) API No- 50-029-20270-00 03/31/06 JRP/PJC FISH(BP DEBRIS) 04/07/14 DW/PJC SET RBP PLUG/GLV GO(04/01/14) SEC 8,T1ON, R15E,662'FNL&733'FVVL 07/26/06 JCFWPAG FISH(TOOLSTRING,CUT BARS) 04/07/14 PJC PERFORATION CORRECTIONS 03/21/10 DDK/SV TREE GO BP Exploration(Alaska) W Q �E 3 V %11111SII. ,i.:._. L I Q . ..a a AIM- _ `�- - �� __ In LU t mom - I :; a T r c �' I j k f T in x I 'co 3a T 1 92 w m of mnr —writ- co O'In I 1 141 co m �° I 2 in- _ _ 1 .. n ga O r ° m a 1 °° EE0 E> ► c• ,,. 1° ° g J 0> - E .,. T E_ io 7 O 1-0 = .L _ 1= V imusO0 VT ✓ ; • 41r ►j E E t o c T I `E Z W W 0{ N N R Uri coJr H .4______,- ____... .4______.;_.� —� W 4 (1 —P4 T-►4 —O- ct O► ct J 0y 3 0 N 73 4 _ 5 N E a Y. c ° DaWQc1 E U WI- Y r I - - O J ii J E N _ N Q J O of '; I W W X d .- CI _ U) N I E 9 -I3 a t ,- I I E 3za "g Ln E C 0 CO : N Q e ��1 s_.t ^ , ): in4111q1111t y LI ill—— co T 1 ,- •i• -- _ -.114., Cr 1 c') 1 .- i T co (I) 10 ^i N U) Cl N _j c 4- _1 J >.=i W a3oa SI O - 3 ago _ O ern �7 pi s0 m� o Om WOE e U gU Y^ Z K . 30 grc ci Z a~ � zac 0 a 0 rr o :.- 1 o fn • 3• g C z Z W L.9 U) rl a a ¢ CD • L.. a Y d a i = •o x a z m Y U _iy O 112 • ill irru :: :I:: :...: § ; §I. : : ; gl'. 41 a ML !n> ___,,,_:‘,7,7,„„.___.,..,,,;_ <„.c;,,, m„,_:-.4 - Z* 1 ' _■moi '. 3 4101. 4 NO a ��� F . -� I dii o E 1 2 o E51 c 0 g 4 S O 4001 •-\- C = F 0 0D-.- 0 `o ' . _ -z m x 7 c6 oa m in - inn n y m (/_ (/_ x a\ ma 'o- N=2 o '' O a' Y a' m O ■00 So%mS iri NOW N� 0 .0 K III•�B -Z -=0 N 00 V N _ N p2\ \ i li W 1 celo i 0" 3 $ O 7� ■ ■ - ■ T A i ' i -3 Z _o - -g e w ce JUIIIIII ° 1.1111111 LHITIIB Q = I' __\ m eIIiI-i o � • • -JI Ate ' 43 S'_ . '- �� CP tl■ S R Q 0 C N EN a 4J " oo\ m 3 n n 6 to P ...-- 0 0 o ,n i Cl ✓ 0c� E r ? E 0 0 c � co zo • oon a0 = 6Q - c''= N 10' a n e "_' w M — r « a N -0 to p Y C1 m o V o N CD 1121 - =u 065 m A 5. O CO m a o w0 o r E 0 @ N c N V Q N Q -J M ✓ r r r r •- %- ,- ....... n- r r r r r r ✓ r r r r r r r r r 2 a aL o,l we ons e = ine e « m00 • ° = > > 0u > > uG 74919717717 , 77991779 0NO NO rNNNNrNN N () rr rN o F _ >- Z % Ui a co a z o. 0 . V t 0 Cl) W zn o Cl)q -J Ili 0 HZF- 1- 01- F- FFHHZHF-FF-1- Fza Z WOOMOMOMMOMOOMMOMMO IZ 0000000000000000000W F 1- 1- 1- 1- 1- f- f- 1- 1- f- f- 1- f- 1-►- f- rrI- w O 000000000000600000q< a[ W W W W W W W W W W W W W W W W W W W o t7C9CDCDC7CDC700000clo ,C9(9CDC9a z 33333333333333333332 Q O 000000000000000000w 0 -1 -1 -1 -1 -1 -1 -1 -1 -1 -1 -1 -1 JJJJJJJF z E 0/ 10 ^ 001 W O 1 OMl - NHh C, % * NogW * W 100M r MO r cnN to RoR 8 goor00 } O 0 0 0 00.. 0 '-'401% m C1mmmmmDw a < 0 < @mmmA4MCo 999 9999999 "Y99999 N cZi O aC J 0 g w c N r o U' c U N c w m 0 a y M J Y C V It g V d ' 0N1'lN * NrN54 .- moN < QNN ' O co W m GO 2 y < w 3 J n, J d � J J J J W 0 r o to .-J N z Y C C t V � oor 0 C) 076 o 0co a B m C c E w o L m AN Y C7 O y (1) 0 um SA a w r Z < Ll O W Q N t 4 a m d rnCD 01-13 (PTD #1770590) Internal Waiver Cancellation - Normal Well . . All, An internal waiver was issued for IAxOA communication on well 01-13 (PTD #1770590) on 03/22/06. The well passed an MITIA on 02/04/07 proving two competent barriers. Under the new WI System /' Policy, set to take effect on June 1,2007,01-13 will be Operable. The well is reclassified as a Normal well. Please remove all waivered well signs and the laminated copy of the waiver from the wellhouse. Thank you, Andrea Hughes Well Integrity Coordinator Office: (907) 659-5102 Pager: (907) 659-5100 x1154 s(;AMN~ MA'( ,2 9 2007 .... >.,.."....... ',>.,J_".,"..!-.~ ----.~...-'~' 1 of 1 5/21/2007 11 :21 AM Hf::CEI\/E _ STATE OF ALASKA _ AL~ OIL AND GAS CONSERVATION CO~SION DEC 1 6 2005 REPORT OF SUNDRY WELL OPERATIONS Alaska Oi/ & Ga o Stimulate DO Other DO Ancboraf)!J o Waiver Time Extension o Re-enter Suspended Well 0 5. Permit to Drill Number: Representative Daily Average Production or Injection Data Gas-Met Water-Bbl Casing Pressure Tubing pressure , SHUT-IN SHUT-IN 15. Well Class after Droposed work: Exploratory Development M Service 16. Well Status after proposed work: Oil M Gas 0 WAG WDSPL 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. 1. Operations Abandon 0 Repair Well [2] Performed: Alter Casing 0 Pull Tubing 0 Change Approved Program 0 Opera!. Shutdown 0 2. Operator BP Exploration (Alaska), Inc. Name: P.O. Box 196612 Anchorage, AK 99519-6612 7. KB Elevation (ft): 3. Address: 73 KB 8. Property Designation: ADL-028329 11. Present Well Condition Summary: Total Depth measured 10740 true vertical 9432.56 Effective Depth measured 10210 true vertical 8978.83 Casing Conductor Surface Production Length 80 2700 10711 Size 20" 91.5# H-40 13-3/8" 72# N-80 9-5/8" 47# N-80 Perforation depth: Measured depth: 10154 - 10193 Closed True Vertical depth: 8930.49 - 8964.19 Tubing: (size, grade, and measured depth) Packers and SSSV (type and measured depth) 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 113. Oil-Bbl Prior to well operation: Subsequent to operation: 14. Attachments: Copies of Logs and Surveys Run Daily Report of Well Operations x Contact Sharmaine Vestal . >, 1··~'1 Plug Perforations Perforate New Pool Perforate 4. Current Well Class: Development ¡;;ï'1 Stratigraphic Exploratory Service 177-0590 6. API Number: 50-029-20270-00-00 9. Well Name and Number: 01-13 10. Field/Pool(s): Prudhoe Bay Field/ Prudhoe Bay Oil Pool feet feet Plugs (measured) Junk (measured) 9588, 10410 None feet feet MD 26 - 106 25 - 2725 24 - 10735 TVD 26 - 106 25 - 2724.98 24 - 9428.28 Burst 1490 4930 6870 Collapse 470 2670 4760 5-1/2"17# 13CR80 23 - 9592 5-1/2" Baker S-3 Packer 9586 ~)CAlÌ\%~ED f' C) í, 1.", (" -'. RBDMS 8Ft DEC ] !1 7. Signat~. ~ Printed Name Sharmaine Vestal Form 10-404 Revised 04/2004 ORir-¡ ¡ 1l.J! , Title Data Mgmt Engr Phone 564-4424 Date 12/14/2005 Submit Original Only e e 01-13 DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS EVENT SUMMARY I ACTIVITVDATE I SUMMARY 11/2/2005 T/I/0=SSV/440/50. Temp=SI. Depress OA FL >500' (gelled diesel job). OA FL @ 78' «5 bbls). Gas will need to be brought from well #33 IA (1250 psi) (IA Fh @ 4215') (226 bbls L 11/3/2005 T/1/0=SSV/440/50. Temp=SI. Depress OA FL >500' (gelled diesel job). OA FL @ 78' «5 bbls). Brought gas from 01-33 IA (1250 psi) (IA FL @ 4215'). Pressured OA in 10 psi increments every 10 minutes to 200 psi. Pressured OA in 200 psi increments every 10 minutes to 1000 psi. Monitored 15 minutes between bumps back to 1000 psi (6.5 hours). Bled OAP to 900 psi to secure. Final OA FL @ª!O' (22 bbls). Final T/I/0=SSV/440/900. 11/4/2005 T/I/0=SSV/430/280. Temp=SI. OA FL Depress> 500'. (Gelled Diesel job). OA FL @ 468' (28 bbl). OAP decreased 620 psi overnight and OA FL dropped 98' ( 5.69 bbl).overnight. Pressure up OAP to 400 psi monitor for 15 minutes. Pressurize OAP in 200 psi increments to 1000 psi, Monitor FL. OAP @ 1000 psi OA FL now @ 501' (30 bbl). Bleed OAP to 900 psi. R/D and monitor for 1 hour. During 1 hour monitor OAP decreased 100 psi to 800 psi. OA FL remained @ 501' (30 bbl). Final WHP's=SSV/430/800. 11/5/2005 T/I/0=SSV/440/230. Temp=SI. Monitor WHP's (post OA FL Depress) (OA FL). OA FL @ 468' (>27 bbls). lAP increased 10 psi, OAP decreased 570 psi overnight. 11/7/2005 T/I/0=SSV/440/200, Temp=SI. Monitor WHP's Check if AL line is blinded or removed. No change in lAP, OAP decreased 30 psi since 11/05/05. AL spool has ben removed & 2" integral was placed on AL line. **Note** IA has 3" integral. 11/9/2005 Assist SLB Load 20 bbls Diesel and heat to 70 * and pump as directed 11/10/2005 T/I/O Shut-ln/450/200 Grease crew serviced OA valve prior to DS rigging up. Pumped 12.9 BBL's of gelled diesel w/6 PPA of 100 mesh sand, 9.2 BBL's of gelled diesel w/ Bentonite and Celloflake, followed by 5 BBL's of straight diesel for a flush. ( Total Volume of treatment pumped was 27.1 BBL's based on a fluid level of 460' taken on 11/05/05 ) Final WHP's, T/I/O Shut-ln/450/775. 11/17/2005 T/:/O = xxx/450/200 MtT OA to 3000 psi (PASSED) on 1st attempt Dropped 140 psi 1st 15 min 60 psi in 2nd 15 min pumped 2 bbls meth and 2.6 bbls crude for a total of 4.6 bbls FWHP's xxx/450/200. FLUIDS PUMPED BBLS 5 Diesel 12.9 Gelled diesel w/6ppa 100 mesh sand 9.2 Gelled diesel w/bentonite and celloflake 100 Hot H2J 127.1 TOTAL ) ) fcJ :1 FJ :L~ FRANK H. MURKOWSKI, GOVERNOR AlASKA OIL AND GAS CONSERVATION COMMISSION 333 W. pH AVENUE, SUITE 100 ANCHORAGE, ALASKA 99501-3539 PHONE (907) 279-1433 FAX (907) 276-7542 Alex Yancey Prod uction Engineer BP Exploration (Alaska), Inc. P.O. Box 196612 Anchorage, Alaska 99519-6612 c(} \11-0./ , Re: Prudhoe Bay 01-13 Sundry Number: 305-309 SCANNED NO\! 0 9 2005 Dear Mr. Yancey: Enclosed is the approved Application for Sundry Approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. Please provide at least twenty-four (24) hours notice for a representative of the Commission to witness any required test. Contact the Commission's petroleum. field inspççtor at (907) 659-3607 (pager). As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the Commission grants for good cause shown, a person affected by it may file with the Commission an application for rehearing. A request for rehearing is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. A person may not appeal a Commission decision to Superior Court unless rehearing has been requested. DATED thisjL day of October, 2005 Enc!. 0;4· / () -I/-ð >'. \l-l Æ øE'rVED- '\ STATE OF ALASKA PrS /"'11' 15~ ALl .J:.A OIL AND GAS CONSERVATION COMMk JåN OCT 1 0 2005 APPLICATION FOR SUNDRY APPROVAL 20 MC 25.280 Alaska Oil & Gas Cons. Commission Operational shutdown U Perforate U WaiveAndhorage Other U Plug Perforations 0 Stimulate 0 Time Extension 0 Perforate New Pool 0 Re-enter Suspended Well 0 4. Current Well Class: 5. Permit to Drill Number: Development 0 / Exploratory D 177-0590 /' Service D 6. API Number: 10. Field/Pools(s): PRUDHOE BAY Field / PRUDHOE OIL Pool PRESENT WELL CONDITION SUMMARY Effective Depth MD (ft): Effective Depth TVD (ft): 10210 8978.83 Abandon U Alter casing 0 Change approved program 0 2. Operator Name: BP Exploration (Alaska), Inc. 3. Address: P.O. Box 196612 Suspend U Repair well 0 Pull Tubing 0 1. Type of Request: Stratigraphic D Anchorage, AK 99519-6612 7. KB Elevation (ft): 9. Well Name and Number: 73 KB 8. Property Designation: ADL-028329 11. Total Depth MD (ft): 10740 Total Depth TVD (ft): 9432.56 Casing Length Size MD / TVD Conductor 80 20" 91.5# H-40 26 106 26 Surface 2700 13-3/8" 72# N-80 25 2725 25 Production 10711 9-5/8" 47# N-80 24 10735 24 Perforation Depth MD (ft): 10154 - 10193 Perforation Depth TVD (ft): 8930.49 - 8964.19 Tubing Size: 5-1/2" 17# 4-1/2" 12.6# Tubing Grade: 13CR80 13CR80 Tubing MD (ft): 23 - 9592 9592 - 9644 13. Well Class after proposed work: Exploratory D Developm ent 0 <" 15. Well Status after proposed work: Oil 0 <,' Gas D Plugged 0 WAG D GINJ D WINJ D Packers and SSSV Type: 5-1/2" Baker S-3 Packer Packers and SSSV MD (ft): 12. Attachments: Descriptive Sum m ary of Proposal 0 Detailed Operations Program D BOP Sketch D 14. Estimated Date for Commencing Operations: 16. Verbal Approval: 10/18/2005 Date: Commission Representative: 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact p~inted Nam./':1;? AleX~~eY~ Title Production Engineer Signature ~ ,?-/{. ~~ c-p-/ Phone 564-5092 Date COMMISSION USE ONLY Conditions of approval: Notify Commission so that a representative may witness 50-029-20270-00-00 /' 01-13 ./ Plugs (measured): Junk (measured): 9588, 10410 None Burst Collapse 106 1490 470 2725 4930 2670 9428 .6870 4760 9586 Service D Abandoned D WDSPL D Prepared by Sharmaine Vestal 564-4424 Alex Yancey 10/4/2005 Plug Integrity 0 BOP Test 0 Mechanical Integrity Test c!r' Location Clearance 0 Sundry Number: .3~ - 30~ Other: j,3 BFl OCT 12 2005 COMMISSIONER APPROVED BY THE COMMISSION Date /~/£ ,....., Form 10-403 Revised 11/2004 ('\ r-', ¡ ('\ ~i, , ;'< , :,.... Î\ il I' c Submit in Duplicate bp ~', ~f".¡ w. ~. ·'t 1rL, . ;~"', J,. "'f~~~ ') ) To: D. Cismoski I J. Bixby Well Operations Team Leader Date: October 3, 2005 From: Janet Sack Design Engineer Subject: 01-13 OA Diesel I Gel Load PBD01WL 13-N Est. Cost: $20 M lOR: 350 BOPD Please perform the following procedure(s): 1. DHD Shoot FL's. Depress OA FL wI AL if <500'. NFT-IA. 2. F OA Gelled Diesel. Pending OA FL falling to >400' ,/" 3. F M ITOA (Post wait on gelled diesel for 3 days) 4. S PuIlIBP. Caliper. (Pending successful MITOA) Well Status: Last Test: Max. Deviation: Minimum 10: Last Tag TO: Last Downhole Op: Latest H2S value: SI for AC 7/5/05: 1461 bopd, 31.3k GOR, 45.7 mmscfpd, 3276 bwpd, 700/0 WC 410 @ 5700' md 3.813" @ 9621' md 4-1/2" HES X Nipp!,e 6/16/05-10,128' slm (10,145' corr) I 8/15/05 - Set IBP @ 9588' md 10 ppm - 7/3/05 OBJECTIVE: 01-13 is a FTS producer with TxlA communication and OA leak. The well failed a CMIT TxlAxOA on 08/08/05 with a LLR = 3.7 BPM @ 1850 psi. The same day, it failed an MITOA with a LLR est at 0.2 BPM @ 3000 psi. On 08/18/95 the well failed another CMIT-TxIAxOA and a CMIT-TxIA passed to 3000 psi. ./,/ This jo~js.designed tOI~ad the OA to surface with gelled diesel and bentonite, in order / to sea(off the leak and tain waiver (requires passing NFT-IA, passing CMIT-TxIA, andpassing CIT-OAt.// If you have any questions or comments regarding this procedure, please call Jennifer Julian at (W) 564-5663, (H) 274-0929 or (Cell) 240-8037. cc: w/a: Well File J. Julian J. Sack A. Yancey ) ) 01-13 JOB PLANNING DETAILS: Current OA leak rate- LLR is 0.2 bpm at 3000 psi (08/08/05) OA= 13-3/8" 72# N-80 IA= 9-5/8" 47# N-80 Shoe at 2725' OAxlA Annular Capacity= .0581 bbls/ft Volume to OA Fluid Level = 29 bbls (based on arctic packed FL of 500') (Volumes will have to be recalculated based on FL's) OA capacity to Shoe = 158 bbls Prep Work: 1. DHD: Shoot IA & OA fluid Levels. Record WHPs, Bleed OA to < 200 psi /"/ 2. When OA FL >400', plan on doing gel job. Procedure: 3. Load out 158 bbls of diesel. Diesel temp must be 60° or greater for gel loading. 4. Flange a 1502 connection to OA valve. Lay hardline to the pump. 5. Pressure test lines to 3000 psi. / 6. Pump Gelled Diesel Treatment (see recipe below). Recommended Pump Schedule: Pump entire treatment @ maximum rate. Maximum treating pressure is 1500 psi. · 10 bbls Gelled diesel-batch in one tub w/ 6 PPA of 100 mesh sand (-2500 Ibs &12.7 bbls slurry) on the fly. · 14 bbls Gelled Diesel w/ Bentonite and Celloflake additives (volume may be different based on final OA FL) · 5 bbls of straight diesel flush Gelled Diesel Recipe: The design calls for mixing 3 gpt of J453 gelling agent, 1.5 gpt of J601 activator, and 2000 ppt of 0020 (bentonite) with the diesel. Prior to adding the diesel to the batch mixer, assure that there is no more than 5 - 10 gallons of water in the piping. Place the diesel into the batch mixer and then roll in the J453, followed by the J601. Run the paddles until a gel starts to form, and then add the 0020. The addition of the 0020 will cause the volume to increase approximately 5%. Celloflake should be added at a concentration of %# per barrel of gelled diesel/bentonite. 7. RDMO Post Work: 8. DHD: After allowing OA to settle for 3 days, attempt to MITOA to 2400 psi. // 9. S: PulllBP if MITOA successful. TREE = WELLHEAD = ACTUA TOR = KB, ELEV = BF. ELEV = KOP= Max Angle = Datum MD = Datum TVD = ) GRA Y GEN II GRAY AXELSON 73' ? 3184' 41 @ 5700' 10088' 8800' SS 13-3/8" CSG, 72#, N-80, ID = 12.347" l-i 2725' Minimum ID = 3.813"@ 9621' 4-1/2" HES X NIPPLE 15-1/2" TBG, 17#, 13-CR, .0232 bpf, ID = 4,892" l-i 9586' I TOP OF 4-1/2" TBG l-i 9592' 14-1/2" TBG, 12.6#, 13-CR, ,0152 bpf, ID = 3.958" 1-1 9644' PERFORA TION SUMMA RY REF LOG: DIESEL/1 0.6 CaC ON 12/23/77 A NGLE A T TOP PERF: 29 @ '10100' Note: Refer to Production DB for historical perf data SIZE SPF INTERV AL Opn/Sqz DA TE 3-1/8" 4 10100 - 10'130 S 06/21/88 3-3/8" 4 10150 - 10154 S 09/25/92 3-3/8" 4 10154 - 10160 C 10/12/92 3-3/8" 4 10160 - 10177 C 02/07/93 3-3/8" 4 10177 - 10187 C 10/12/92 3-3/8" 4 10187 - 10'193 C 08/16/94 3-3/8" 1 10193 - 10200 S 09/25/92 3-3/8" 2 10236 - 10256 S 09/25/92 2,,7/8" 4 10448 - 10488 S 05/15/82 2-7/8" 4 10498 - 10515 S 05/15/82 2-7/8" 4 10529 - 10557 S 05/15/82 2-7/8" 4 10571 - 10629 S 05/15/82 I PBTD 1-1 10693' 9-5/8" CSG, 47#. N-SO, 10 = 8,681" 1-1 TO 1-1 1 0735' 10740' DATE 01/02/78 04/01/99 03/10/03 06/04/03 06/05/03 06/21/05 REV BY COMMENTS ORIGINAL COM PLETION LAST WORKOV ER JMP/TP WAIVER SAFETY NOTE KRB/TLP PERF CORRECTIONS CMO/TLP MAX ANGLE KSB/PJC GL V C/O DATE 07/10/05 07/19/05 08/22/05 10/01/05 01-13 I I J L z~, Þ<. -\ ) I I r- ~~ SAFET, ')TES: ,*** CHROME TUBING *** /' 2173' 1-1 5-1/2" HES X NIP, ID = 4.562" 1 ~ GAS LIFT MANDRELS DEV TYPE VLV LATCH 22 LB-9CR DOME T2 39 LB-9CR OGL V T2 36 LB-9CR DMY T2 31 LB-9CR DMY T2 PORT DATE 16 06/21/05 20 06/21/05 o o ST MD TVD 1 3756 3729 2 6263 5742 3 8098 7186 4 9067 7989 9586' 1-19-5/8" X 5-1/2" BAKER S-3 PKR, ID = 4.750" 9588' 1-iIßP(08/15/05) 9591' l-i 5-1/2" X 4-1/2" XO 1 9621' l-i 4-1/2" HES X NIP, 10 = 3.813" 9644' 1-1 TUBING TAIL, ID = 4.00" 1 9619' 1-1 ELMD TT NOT A V AILABLE 1 10210' l-i TOPOF CEMENT (09/25/92) I ) 10410' 1-1 IBP(12/05/87) (CTM) 1 REV BY COMMENTS DA V /PJC HES NIP @9621 CORRECTION RWL/PJC WEATHERFORD WRP @ 9596 RWLlTLH IBP PULLED/SET (08/15/05) EZLlPAG WAIVER SFTY NOTE DELETED PRUDHOE BA Y UNIT WELL: 01-13 PERMIT No: r-1770590 API No: 50-029-20270-00 SEC 8, T10N, R15E, 1386,63' FEL & 4272.4' FNL BP Exploration (Alaska) l:::IVED " STATE OF ALASKA) ALA~ .1 OIL AND GAS CONSERVATION COMrv.....,SION AUG 3 0 2005 REPORT OF SUNDRY WELL OPERATIONS~~:."dc" 'Oil jf~ [~nrlli~. CmTìmission Abandon D Repair Well D Plug Perforations Gl Stimulate D I' ~"ÔTher ~ 111.. '.'" 'o!'.\ ~ U ~~"t!¡l"~~ a~~~ Performed: Alter Casing D Pull Tubing D Perforate New Pool D WaiverD Time Extension Dð" '" ,,'" .. Change Approved Program D Operat. Shutdown D Perforate D Re-enter Suspended Well D 2. Operator BP Exploration (Alaska), Inc. 4. Current Well Class: 5. Permit to Drill Number: Name: Development ß?1 Exploratory 177-0590 3. Address: P.O. Box 196612 Stratigraphic C Service 6. API Number: Anchorage, AK 99519-6612 50-029-20270-00-00 7. KB Elevation (ft): 9. Well Name and Number: If""" '~~'Þ¡QI ~ ~~'I<'':j'''\M 1. Operations 73 KB 01-13 8. Property Designation: ADL-028329 11. Present Well Condition Summary: 10. Field/Pool(s): PRUDHOE BAY Field/ PRUDHOE OIL Pool Total Depth measured 10740 true vertical 9432.56 feet feet Plugs (measured) Junk (measured) 9588, 10410 None Effective Depth measured 9588 true vertical 8438.96 feet feet Casing Conductor Surface Production Length 80 2700 10711 Size 20" 91.5# H-40 13-3/8" 72# N-80 9-5/8" 47# N-80 MD 26 - 106 25 - 2725 24 - 10735 TVD 26 - 106 25 - 2724.98 24 - 9428.28 Burst 1490 4930 6870 Collapse 470 2670 4760 Perforation depth: c-,."·"') ii\.~N(:::r') Ç'FD ii' .¡ ")0 {]': t~liAn ¡¡;;~",;'~) .: ,~1.1 ,_,' .J Measured depth: 10154 -10187 True Vertical depth: 8930.49 - 8959.01 Tubing: (size, grade, and measured depth) 5-1/2" 17# 4-1/2" 12.6# 13CR80 13CR80 23 - 9592 9592 - 9644 Packers and SSSV (type and measured depth) 5-1/2" Baker S-3 Packer 9586 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: RBDMS BFL AUG 3 1 1005 13. Oil-Bbl Representative Daily Average Production or Injection Data Gas-Met I Water-Bbl I Casing Pressure Tubing pressure Prior to well operation: Subsequent to operation: 14. Attachments: Copies of Logs and Surveys Run Daily Report of Well Operations SHUT-IN x 15. Well Class after croposed work: Exploratory r Development P 16. Well Status after proposed work: Oil P Gas r WAG r GINJ r Service r WINJ r WDSPLr 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt: N/A Contact Sharmaine Vestal Printed Name Sharmaine Vestal _ _ ) Signatu~~. ?~A17!;1 Title Data Mgmt Engr Form 10-404 Revised 04/2004 Phone 564-4424 ¡ '''''''''NAL ~ t -. I :Ui Date 8/26/2005 Submit Original Only ') ) 01-13 DESCRIPTION OF WORK COMPLETED NRWO OPERATIONS EVENT SUMMARY I ACTIVITYDATE I SUMMARY 7/15/2005 WEATHERFORD WRP PLUG SET AT 9618'. PLUG STUCK IN X NIP AND SET, LOG NOT CORRELATED TO TUBING SUMMARY PRIOR TO BEING STUCK. POSITIVE INDICATION OF SET SEEN AT SURFACE. CONFIRMED AFTER POOH. **NOTIFY DSO OF WELL STATUS** 7/16/2005 T/I/O = 1280/760/220. CMIT-TxIAxOA to 3000 psi (FAILED) [Well Shut in]. Pumped 172 bbls of diesel down the IA at 2 bpm. Pressure got as high as 1400 psi with 70 bbls away and then fell to 100 psi. Pumped 135 bbls of crude down the Tbg. The pressure fell to 500 psi. Final WHP= 500/100/225. *** WSR continues on 07-17-05*** 7/17/2005 CMIT-TxIAxOA to 3000 psi. FAILED MIT-T to 3000 psi. FAILED *** WSR continued from 07-16-05*** 7/17/2005 ***WELL SI ON ARRIVAL*** (REG COMPL) ATTEMPT TO PULL WRP FROM 9629' SLM ***CONT. ON 07-18-05*** 7/18/2005 ***WELL SI ON ARRIVAL*** (REG COMPL) RAN 4.5" GR AND BRUSH TO RATTLE MANDRELS (WRP SLIPS LEFT IN HOLE) ***CONT. ON 07-19-05*** 7/18/2005 ***CONT. FROM 07-17-05*** (REG COMPL) PULLED 3,69" WRP FROM 9629' SLM ***WELL LEFT SI, TURNED WELL OVER TO DSO*** 7/19/2005 ***CONT. FROM 07-18-05***, (REG COMPL) DRIFT W/ 3.70" CENT, TAG EOT @ 9622' SLM SET 3.74" WRP @ 9580' SLM, 9596' MD. ***CONT. ON 07-19-05*** 7/20/2005 ***CONT, FROM 07-20-05*** (REG COMPL) RIG DOWN ***LEFT WELL SI, TURNED WELL OVER TO DSO*** 7/21/2005 TIO=2520/110/210, temp=SI. TBG FL @ 9580' (223 bbls). IA FL @ surface. OA FL @ 500' (29 bbls) (prep for CM IT TxIAxOA) 8/4/2005 T/I/O=2520/0/200 Bleed gas off tubing (contined on 8-05-05) 8/5/2005 (continued from 8-04-05) T/I/O=21 00/0/200 Continuing gas bleed off of tbg called off to rig job 8/7/2005 T/I/O=2300/0/40 MIT TBG to 3000 psi, CMIT Tx IA x OA to 3000 psi [Risk Assessment] Started by pumping 20 bbls of crude down tbg. SD & allowed gas to swap out. Bled gas down flowline. Attempted lube & bled method twice more. Pumped 70 bbls of crude down tbg @ this juncture. Abandon bleeding gas down flowline. Pumped 202 bbls of crude down tbg. Bled OAP to 3 psi. lAP decreased w/ OAP to 3 psi ----Continued on next AWGRS--- (See Pump Report for Details). ) ) I ACTIVITYDATE I SUMMARY cont'd 8/8/2005 ---Continued from Previous AWGRS--- CMIT Tx IA x OA (FAILED) Pumped 28 bbls of crude down tbg for a total of 230 bbls. SD & allowed to gas to swap out. RD from Tbg & RU to OA to fluid pack, Fluid Packed OA to 1700 psi w/ 34.3 bbls of diesel. lAP never changed (10 psi). RD from OA & RU to IA. OAP decreased from 1700 psi to 900 psi in 14 mins, Fluid packed & pressured IA to 920 psi w/4 bbls of diesel. SD for 10 mins. OA continue decline in pressure. Brought pump back on line down IA @ 1.0 bpm, lAP stabilized @ 1100 psi. for 11 bbls. (IA & OA fluid packed) RD from IA & RU back up to Tbg in attempt to fluid pack and see increase in TP or pump past WRP. TP =780 psi. Pumped 45 bbls of crude @ 2.0 bpm. TP= 550 psi. upon SD of pump. TOTAL crude down tbg = 275 bbls Notify DSO of results RDMO Final WHP"s 550/640/70. 8/8/2005 T/I/O=1080/420/20 CMIT TBGxlAxOA to 3000 PSI. FAILED Pumped 160 bbls crude down tbg @ 3 BPM pressure dropped of from 1100 psi to 550 psi during pump, Fluid level was @ 223 bbls on tbg & pumped 385 bbls (Total) down tbg today. Did not pressure up. Rigged up to OA & pumped 3 bbls crude, pressured up to 2500 psi, Monitor OA pressure for 15 minutes, loss 1500 psi in 15 minutes. Attempted LLR on OA, Estamated leak @ ,2 BPM = 3000 psi, Will need smaller pump to establish LLR. Continued to next day to test IA to 3000 psi to check for TxlxO comunication. 8/9/2005 Continued from 8-8-05 Finished pumping CMIT TBGxlAxOA to 3000 psi FAILED Pumped 25 bbls down IA @ 3.7 BPM reached 1850 psi for 25 bbls, pressure dropped off to starting pressure in 15 minutes. FWHP's=320/340/30 8/11/2005 T/I/O=1740/370/30. Temp=SI. WHP's, post CMIT. (RA work.) TP increased 1420 psi, lAP increased 30 psi overnight. 8/14/2005 T/I/O= 2530/990/20. Temp= SI. TBG FL (eval for E-line). TBG FL @ 9596' (223 bbls), near WRP. AIL spool disconnected form IA casing valve. 8/14/2005 ***WELL SI ON ARRIVAL*** PULLED WRP @ 9578' SLM ***LEFT WELL SI, TURNED OVER TO DSO*** 8/15/2005 T/I/O=2500/1000/0 Load tubing for E Line job. Pumped 220 bbls down tubing as directed, FWHP's=500/420/0 8/15/2005 Set Baker 3 3/8" IBP Plug @ 9588' , in Baker S-3 PKR (Reg Campi) FN = 1.75", 6.50' to center element, Overall length 11.59' 2- 2 x 6" long elements and1- 1" stiffener ring **Notify DSO of well status- Left well shut in** 8/17/2005 T/I/O=560/480/30 CMIT TBG x IA x OA to 3000 psi. FAILED Tubing and IA held pressure while OA pressure continued to fall off, CMIT TBG x IA to 3000 psi PASSED On 1st attempt. Loss 70 psi 1st 15 min, Loss 30 psi 2nd 15 min. Bled down well. FWHP's=760/450/50 FLUIDS PUMPED BBLS 2 Diesel to pull WRP and set IBP 2 TOTAL TREE =, WELLHEA D = ACTUATOR = KB. ELEV = BF, ELEV = KOP= Max Angle = Datum MD = Datum NO = GRAY GEN II GRAY AXELSON 73' ? 3184' 41 @ 5700' 10088' 8800' SS ) 13-3/8" CSG, 72#, N-80, 10 = 12.347" l-i 2725' Minimum ID = 3.813"@ 9621' 4-1/2" HES X NIPPLE 15-1/2" TBG, 17#, 13-CR, .0232 bpf, 10 = 4.892" 1-1 I TOP OF 4-1/2" TBG l-i 9586' 9592' 14-1/2" TBG, 12.6#, 13-CR, .0152 bpf, 10 = 3.958" l-i 9644' PERFORA TION SUMMARY REF LOG: DIESEL/10.6 CaC ON 12/23/77 ANGLEATTOPPERF: 29 @ 10100' Note: Refer to Production DB for historical perf data SIZE SPF INTERV AL Opn/Sqz DA TE 3-1/8" 4 10100 - 10130 S 06/21/88 3-3/8" 4 10150 - 10154 S 09/25/92 3-3/8" 4 10154 - 10160 C 10/12/92 3-3/8" 4 10160 - 10177 C 02/07/93 3-3/8" 4 10177 - 10187 C 10/12/92 3-3/8" 4 10187 - 10193 C 08/16/94 3-3/8" 1 10193 - 10200 S 09/25/92 3-3/8" 2 10236 - 10256 S 09/25/92 2-7/8" 4 10448 - 10488 S 05/15/82 2-7/8" 4 10498 - 10515 S 05/15/82 2-7/8" 4 1 0529 - 1 0557 S 05/15/82 2-7/8" 4 10571 - 10629 S 05/15/82 I PBTD l-i 9-5/8" CSG, 47#, N-80, ID = 8.681" l-i 10735' TD l-i 10740' 01-13 I I ~ l z~x -\ ) I , SAFEn 1ES: *** IA X OA COMM. OPERATING PRESSURE OF THE 13-3/8" ANNULUS MUST NOT EXCEED 2000 PSI (02/05/03 WAIVER) *** CHROME TUBING 2173' l-i 5-1/2" HES X NIP, 10 = 4.562" I 1\ GAS LIFT MANDRELS DEV TYPE VLV LATCH 22 LB-9CR DOME T2 39 LB-9CR OGL V T2 36 LB-9CR DMY T2 31 LB-9CR DMY T2 PORT DATE 16 06/21/05 20 06/21/05 o o ST MD NO 1 3756 3729 2 6263 5742 3 8098 7186 4 9067 7989 9586' 1-i9-5/8" X 5-1/2" BAKER S-3 PKR, ID = 4.'750" 9588' 1-1 IBP (08/15/05) 1 9591' 1-1 5-1/2" X 4-1/2" XO I 9621' 1-1 4-1/2" HES X NIP, ID = 3.813" 9644' l-i TUBING TAIL, 10 = 4.00" 1 9619' l-i ELMO IT NOT A V AILABLE I 10210' 1--1 TOP OF CEMENT (09/25/92) I 10410' l-i IBP(12/05/87) (CTM) 1 DA TE REV BY COMMENTS 07/10/05 DA V /PJC HES NIP @9621 CORRECTION 07/19/05 RWL/PJC WEA THERFORD WRP @ 9596 08/22/05 RWL/TLH IBP PULLED/SET (08/15/05) PRUDHOE BA Y UNIT WELL: 01-13 PERMIT No: 1770590 API No: 50-029-20270-00 SEC 8, T10N, R15E, 1386,63' FEL & 4272.4' FNL DATE 01/02/78 04/01/99 03/10/03 06/04/03 06/05/03 06/21/05 REV BY COMMENTS ORIGINAL COM PLETION LAST WORKOV ER JMP/TP WAIVER SAFETY NOTE KRB/TLP PERF CORRECTIONS CMO/TLP MAX ANGLE KSB/PJC GL V C/O BP Exploration (Alaska) STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: []Operation Shutdown []Stimulate [] Pull Tubing [] Alter Casing 2. Name of Operator 15. ARCO Alaska Inc. I 3. Address P.O. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 662' SNL, 733' EWL, SEC. 08, T10N, R15E, UM At top of productive interval 1301' NSL, 1116' WEL, SEC. 07, T1 ON, R15E, UM At effective depth At total depth 1006' NSL, 1375' WEL, SEC. 07, T10N, R15E, UM [] Plugging [] Perforate [] Repair Well []Other Type of well: [] Development [] Exploratory [] Stratigraphic ~] Service 6. Datum Elevation (DF or KB) 73' RKB 7. Unit or Property Name Prudhoe Bay Unit 8. Well Number 01-13 9. Permit Number / Approval No. 77-59 10. APl Number 50-029-20270 11. Field and Pool Prudhoe Bay Field / Prudhoe Bay Pool 12. Present well condition summary Total depth: measured 10740 true vertical 9432 Effective depth: measured 10198 true vertical 8968 Casing Length Structural Conductor 125' Surface 2652' Intermediate Production 10662' Liner feet Plugs (measured) feet feet Junk (measured) feet Fill at 11198' (08/94); Cement Plug at 10200' Size Cemented MD TVD 20" 225 sx Arcticset 125' 125' 13-3/8" 5500 sx Permafrost II 2725' 2724' 9-5/8" 1000 sx Class 'G' 10735' 9428' Perforation depth: measured 10154' - 10194' true vertical 8930' - 8965' Tubing (size, grade, and measured depth) 5-1/2", 17#, 13Cr, NSCC to 9592' with 4-1/2" tailpipe to 9644' Packers and SSSV (type and measured depth) 9-5/8" x 5-1/2" Baker 'S-3' packer at 9586'; 4-1/2" HES SSSV 'X' Nipple at 2173' 13. Stimulation or cement squeeze summary Intervals treated (measured) O~iGi~i~L Treatment description including volumes used and final pressure . 14. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation: Subsequent to operation: ~ 5. Attachments [] Copies of Logs and Surveys run [] Daily Report of Well Operations 16. Status of well classifications as: [] Oil [] Gas [] Suspended Service 17. I hereby certify that the fgregoing is true and correct to the best of my knowledge Signed ~~ ~ Terrie Hubble ' Title Technical Assistant III Prepared By Name/Number: Terrie Hubble, 564-4628 Submit In Duplicat~ Form 10-404 Rev. 06/15/88 Facility PB DS 01 Progress Report Well 01-13 Rig Nabors 9ES Page Date 1 14 April 99 Date/Time 21 Mar 99 22 Mar 99 23 Mar 99 24 Mar 99 25 Mar 99 26 Mar 99 16:30-20:00 20:00-20:30 20:30-02:00 02:00-06:00 06:00-09:00 09:00-10:00 10:00-11:00 11:00-12:00 12:00-12:30 12:30-14:00 14:00-14:30 14:30-18:00 18:00-19:30 19:30-23:00 23:00-01:00 01:00-06:00 06:00-07:30 07:30-08:30 08:30-15:00 15:00-16:30 16:30-18:00 18:00-19:30 19:30-20:30 20:30-22:30 22:30-01:30 01:30-06:00 06:00-10:00 10:00-10:30 10:30-12:30 12:30-13:30 13:30-14:30 14:30-16:30 16:30-03:30 03:30-04:30 04:30-06:00 06:00-06:30 06:30-07:00 07:00-09:00 09:00-11:00 11:00-11:30 11:30-15:30 15:30-16:00 16:00-16:30 16:30-20:30 20:30-21:30 21:30-22:00 22:00-02:00 02:00-04:30 04:30-05:30 05:30-06:00 06:00-09:30 09:30-10:00 10:00-10:15 10:15-10:30 Duration 3-1/2 hr 1/2 hr 5-1/2 hr 4 hr 3hr lhr 1 hr lhr 1/2 hr 1-1/2 hr 1/2 hr 3-1/2 hr 1-1/2 hr 3-1/2 hr 2hr 5hr 1-1/2 hr lhr 6-1/2 hr 1-1/2 hr 1-1/2 hr 1-1/2 hr lhr 2 hr 3hr 4-1/2 hr 4hr 1/2 hr 2 hr lhr 1 hr 2 hr llhr lhr 1-1/2 hr 1/2 hr 1/2 hr 2hr 2hr 1/2 hr 4hr 1/2 hr 1/2 hr 4hr lhr 1/2 hr 4hr 2-1/2 hr lhr 1/2 hr 3-1/2 hr 1/2 hr 1/4 hr 1/4 hr Activity Rigged down Drillfloor / Derrick Held safety meeting Rig moved 100.00 % Fill pits with Seawater Fill pits with Seawater (cont...) Held safety meeting Installed Crossover valve Tested Crossover valve Held safety meeting Installed High pressure lines Removed Hanger plug Circulated at 3811.0 ft Installed Hanger plug Removed Xmas tree Installed BOP stack Repaired Blind / Shear ram Repaired Blind / Shear ram (cont...) Installed BOP stack Tested BOP stack Held safety meeting Serviced Block line Repaired Mechanical brake Serviced Top drive Removed Hanger plug Pulled Tubing on retrieval string to 32.0 ft Laid down Tubing of 2000.0 ft Laid down 3828.0 ft of Tubing (cont...) Removed Tubing handling equipment Tested Casing Installed Wear bushing Serviced Top drive Rigged up Logging/braided cable equipment Conducted electric cable operations Made up BHA no. 1 R.I.H. to 2000.0 ft R.I.H. to 3827.0 ft (cont...) Fished at 3827.0 ft Circulated at 6320.0 ft Pulled out of hole to 3827.0 ft Made up BHA no. 1 Laid down fish Serviced Top drive Made up BHA no. 2 Singled in drill pipe to 3150.0 ft R.I.H. to 6327.0 ft Fished at 6327.0 ft Circulated at 9549.0 ft Pulled out of hole to 6327.0 ft Pulled BHA Laid down fish Laid down fish (cont...) Rigged down Tubing handling equipment Removed Wear bushing Installed BOP test plug assembly Facility PB DS O1 Progress Report Well 01-13 Rig Nabors 9ES Page Date 2 14 April 99 Date/Time 27 Mar 99 28 Mar 99 29 Mar 99 30 Mar 99 31 Mar 99 01 Apr 99 10:30-11:00 11:00-13:00 13:00-13:30 13:30-14:00 14:00-18:00 18:00-21:30 21:30-22:00 22:00-00:00 00:00-04:30 04:30-06:00 06:00-06:30 06:30-09:00 09:00-15:30 15:30-18:00 18:00-23:00 23:00-23:30 23:30-00:00 00:00-04:00 04:00-06:00 06:00-07:30 07:30-10:00 10:00-11:30 11:30-13:30 13:30-14:30 14:30-15:30 15:30-22:00 22:00-01:30 01:30-03:00 03:00-04:00 04:00-06:00 06:00-07:00 07:00-09:30 09:30-18:00 18:00-20:30 20:30-21:00 21:00-21:30 21:30-22:30 22:30-01:00 01:00-02:30 02:30-06:00 06:00-05:15 05:15-06:00 06:00-06:30 06:30-11:00 11:00-12:30 12:30-14:00 14:00-14:30 14:30-15:30 15:30-18:30 18:30-21:00 21:00-21:30 21:30-00:30 00:30-01:30 01:30-04:00 Duration 1/2 hr 2hr 1/2 hr 1/2 hr 4hr 3-1/2 hr 1/2 hr 2 hr 4-1/2 hr 1-1/2 hr 1/2 hr 2-1/2 hr 6-1/2 hr 2-1/2 hr 5hr 1/2 hr 1/2 hr 4 hr 2 hr 1-1/2 hr 2-1/2 hr 1-1/2 hr 2 hr lhr lhr 6-1/2 hr 3-1/2 hr 1-1/2 hr 1 hr 2 hr 1 hr 2-1/2 hr 8-1/2 hr 2-1/2 hr 1/2 hr 1/2 hr lhr 2-1/2 hr 1-1/2 hr 3-1/2 hr 23-1/4 hr 3/4 hr 1/2hr 4-1/2 hr 1-1/2 hr 1-1/2 hr 1/2 hr 1 hr 3 hr 2-1/2 hr 1/2 hr 3hr lhr 2-1/2 hr Activity Rigged up Variable ram Repaired HCR valve Tested Variable ram Installed Wear bushing Made up BHA no. 3 R.I.H. to 9535.0 ft Fished at 9535.0 ft Circulated at 9535.0 ft Pulled out of hole to 0.0 ft Laid down fish Serviced Top drive Made up BHA no. 4 R.I.H. to 9623.0 ft Milled Permanent packer at 9633.0 ft Circulated at 9693.0 ft Pulled out of hole to 8753.0 ft Flow check Pulled out of hole to 367.0 ft Pulled BHA Made up BHA no. 5 R.I.H. to 3100.0 ft Held safety meeting R.I.H. to 9100.0 ft Held safety meeting Fished at 10048.0 ft Pulled out of hole to 45.0 ft Laid down fish Ran Drillpipe in stands to 2342.0 ft Serviced Block line Ran Drillpipe in stands to 7026.0 ft Ran Drillpipe in stands to 9700.0 ft (cont...) Circulated at 9700.0 ft Laid down 9430.0 ft of 4in OD drill pipe Laid down 270.0 ft of Drill collar Removed Wear bushing Rigged up Top ram Held safety meeting Rigged up Top ram Rigged up Completion string handling equipment Ran Tubing to 400.0 ft (5-1/2in OD) Ran Tubing to 9600.0 ft (5-1/2in OD) Installed Tubing hanger Installed Hanger assembly Reverse circulated at 9645.0 ft Set packer at 9586.0 ft with 4000.0 psi Tested Casing - Via annulus Rigged down sub-surface equipment - Casing Serviced Top drive Rigged down BOP stack Installed Surface tree Tested Surface tree Freeze protect well - 150.000 bbl of Diesel Installed Hanger plug Rigged down Drillfloor / Derrick Schl~ GeoQuest 500 w. International Airport Road Anchorage, AK 99518-1199 ATTN: Sherrie NO. 9756 Company: 9/26/95 Alaska Oil & Gas Cons Comm Attn: Larry Grant 3001 Porcupine Drive Anchorage, AK 99501 Field: Well Job # Log Description Date BL Prudhoe Bay Floppy RF Sepia DIR MWD Disk D.S. 1-11 '"~ b~" ~ PRODUCTION PROFILE 9 5 0 91 4 I 1 D.S. 1-13~'J~ O~"~ PRODUCTION PROFILE 9 5 0 91 6 I 1 D.S. 1-19 ' 'r~ I ~-- ~ PERFORATING RECORD 9 5 0 914 I 1 D.S. 6-17 ~' ~- C~ ~'~ BAKER INFLATABLE BRIDGE PLUG 9 5 0 916 I 1 D.S. 6-19 ~ ~-- I ~ ~ LEAK DETECTION LOG 9 5 0 91 5 I 1 D.S. 15-12 ~ ! J ~ TUBING PATCH SET RECORD 950913 I I SIGNED' Please sign and return one copy of this transmittal to Sherrie at the above address. Thank you. ', __. STATE OF ALASKA ALASKA _AND GAS CONSERVATION CC ,,llSSlON REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown Stimulate Plugging Perforate X Pull tubing Alter casing Repair well Other 2. Name of Operator ARCO Alaska, Inc. 3. Address P.O. Box 100360, Anchorage, AK 99510-0360 4. Location of well at surface 662' S & 733' E of NW cr., Sec. 8, T10N, R15E, UM At top of productive interval 1301' N & 1116' W of SE cr., Sec. 7, T10N, R15E, UM At effective depth At total depth 1006' N & 1375' W of SE cr., Sec. 7, T10N, R15E, UM 5. Type of Well Development Exploratory Stratigraphic Service 6. Datum of elevation(DF or KB) 73 RKB feet 7. Unit or Property Prudhoe Bay Unit 8. Well number 1-13 9. Permit number/approval number 77-59 10. APl number 50 - 029-20270 11, Field/Pool Prudhoe Bay Oil Pool 12. Present well condition summary Total depth: measured true vertical 10740 feet 9432 feet Effective depth: measured 10198 feet true vertical 8968 feet Casing Length Size Conductor 125' 20" Su dace 2652' 13-3/8" Production 10662' 9-5/8" Plugs(measured) Fill @ 11198' MD (8/16/94); Cement Plug @ 10200' MD Junk(measured) Cemented Measured depth 225 sx AS 125' 5500 sx PF II 2725' 1000 sx G 10735' True vertical depth 125' 2724' 9428' RECEIVED Perforation depth: measured 10154-10194' true vertical 8930-8965' SEP 2 5 1994 0il & Gas Cons. Commission ^nchors~e Tubing (size, grade, and measured depth) 5-1/2", 17#, N-80, NPCT @ 9646' MD; 4-1/2", 12.6#, N-80, NPC tail @ 9754' MD Packers and SSSV (type and measured depth) Baker SAB packer @ 9625' MD; Camco BaI-O SSSV @ 2187' MD 13. Stimulation or cement squeeze summary Intervals treated(measured) See attached. Treatment description including volumes used and final pressure 14. Prior to well operation Subsequent to operation Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure 2273 25201 2779 -- 2274// 25059 2715 -- Tubing Pressure 846 925 15. Attachments Copies of Logs and Surveys run Daily Report of Well Operations 16. Status of well classification as: Oil x Gas . Suspended Service 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed ~~¢'u~¢~. //~z~ Title Engineering Supervisor Form 10-404 Rev 06/15/88 -~ 99~/1 z~ r,r,. 14'7 . I\A/P Date .SUBMIT IN DUPLICATE 1-13 PERFORATING OPERATIONS DESCRIPTION OF WORK COMPLETED 8/16/94: MI RU & PT equipment. 6' of reperforations as follows: Reperforated: 10187 - 10193' MD (Z4) Ref. Log: BHCS 12/23/77. Used a 3-3/8" carrier & shot 4 spf at 180 degree phasing, at underbalanced pressure. POOH w/perf gun. Rigged down. RIH w/perforating gun & tagged PBTD at 10198' MD, then PU & shot Returned the well to production w/gas lift & obtained a valid welltest. R£C£ V£D Oil & Gas Cons. Commission Anchon :.?~ ~uest rd:x] w. International Airport Road Anchorage, AK 99518-1199 ATTN: Sherrie NO. 8919 Company: Alaska Oil & Gas Cons Cc)mm Attn: Larry Grant 3001 Porcupine Drive Anchorage, AK 99501 9/8/94 Field: Prudhoe Bay Well Log Description BL RR Sepia RF Sepia Mylar ?cf-_ ~?, D.S.' 1-9A" PERF RECORD (8-15-94) 1 1 ~z-~-~f D.$. 1-13 PERF RECORD (8-16-94) 1 1 9/,,-'~ D.S. 3-3 PERF RECORD (8-15-94) 1 1 ~7~..0 D.S. 6-2 PERF RECORD (8-17-94) 1 1 ~ D.S. 6-13 PROD LOG (8-16-94) 1 1 · '- ,,'V ~ D.S. 6-24 PERF RECORD (8-17-94) 1 1 i~/~ '~ T D.S. 9-16 INJEC PROFILE (8-1e-94) 1 ' 1 Please sign and retuZe copy of this transmittal to Sherrle at the above address. Thonk you. DATE: e£C£1vEb u s 1994 4/~ska 0il & Sas Cons. AnChorage Commission ARCO Alaska, Inc. P.O.Box 100360 Anchorage, Alaska 99510 DATE: REFERENCE: ARCO CASED HOLE FINALS -11 1-24-93 -11 2-7-93 1-13 2-7-93 ~1-24A 2-20-93 ~'L'-~~1-30 1-24-93 '~'~-~t~ "' 2-14 7-27-91 .~-- 3-9 12-19-92 ~-24 1-25-93 '3-32 3-32 4-25-92 4-25-92 ~3-34A =-~-~3 - 1 1-18 ~12-4A 2-11-93 ~k~12-1~ 2-11-93 ~ 12-29 12-22-92 ~12-32 12-26-92 /14-5A 2-20-~3 ~14-12 4-24-92 ~~4-~ 4-~4-~ 4 -37 4-13-~ 2 4-37 4-13-~2 RECEIVED 6-21 7-23-92 PSGT Computed Results 6-21 7-23-92 PSGT 6-27 8-23-92 Perf Record 16-30 2-12-93 Perf Record ~ ~~17-21 12-20-92 Perf Record Please sign and return t~e att.ached co. py as receipt of data. RECEIVED BY __ _____. Sonya Wallace ATO-1529 'A/aska Oil &a..~..._Gas Cons, Commleelon Pe~ Record "~~' H~ Pe~ Record R~ 1. ~' H~ Pe~ Record R~ 1. ~' H~ Pe~ Record R~ 1. ~' H~ Pe~ Record R~ 1, ~* H~ T~ R~ 1, ~' H~ Pe~ Record R~ 1, ~' H~ Pe~ Record R~ 1, ~' H~ POST Computed Resets R~ 1, ~' H~ PSGT R~ 1, ~' H~ Peal Record R~ 1. ~' H~ Pe~ Record R~ 1. ~' H~ T~ R~ 1, ~' H~ DSN R~ 1, ~' H~ T~ Boron ~Jection R~ 1, ~' H~ Pe~ Record R~ 1, ~' H~ Pe~ Record R~ 1, ~' H~ PSGT Computed Resets R~ 1, ~' H~ ~OT 5 ~/M~ R~ 1, ~' H~ ~GT 10 ~/~ R~ 1, ~' H~ Pe~ Record R~ 1. ~ H~ Pe~ Record R~ 1, ~' H~ PSGT Computed Resets R~ 1. ~* H~ PSGT R~ 1. ~' H~ Pe~ Record R~ 1, ~' H~ PSGT Com~uted Re~s H~ 1. ~' H~ PSGT R~ 1, ~' H~ Pe~ Record R~ 1, ~' H~ Pe~ Record R~ 1, ~' H~ Pe~ Record R~ 1. ~' H~ Pe~ Record R~ 1. ~' H~ Pe~ Record R~ 1. ~' H~ PSOT Computed Resets R~ 1. ~' H~ PSGT R~ 1. ~' H~ PSaT Computed Resets R~ 1, ~ H~ PSGT R~ 1, ~' H~ R~ 1, ~' H~ R~ 1, ~' H~ R~ 1, ~' H~ R~ 1, ~' H~ R~ 1, ~' H~ # CENTRAL FILES # CHEVRON # LUCILLE JOHNSTON # EXXON PHILLIPS MOBIL BPX STATE OF ALASKA * The correct apl# for 3-32 is 50~029-21141-00. STATE OF ALASKA ..... ALASK, IL AND GAS CONSERVATION C MISSION REPORT OF SUNDRY W.E.u,L,,n,L OPc. R .'I'IONS ,, Operation shutdown Stimulate gg' g X 1. Operations performed' I Pull tubing Alter casing Repair well Other 6. Datum of elevahon(DF or KB) 2. Name of Operator ARCO Alaska~ Inc. 3. Address P.O. Box 100360, Anchorage, AK 99510-0360 4. Location of well at surface 662' S & 733' E of NW cr, Sec. 8, T10N, R15E, UM At top of productive interval 1301' N & 1116' W OF SE cr, Sec. 7, T10N, R15E, UM At effective depth At total depth 1006' N & 1375' W OF SE cr, Sec. 7, T10N, R15E, UM 5. Type of Well Development X 73 RKB feet Exploratory Stratigraphic 7. Unit or Property service Prudhoe Bay Unit 8. Well number 1-13 9. Permit number/approval number 77-59 10. APl number 50 - 029-20270 11. Field/Pool Prudhoe Bay Oil Pool 12. Present well condition summary Total depth: measured true vertical 10740 feet 9432 feet Effective depth: measured 10693 feet true vertical 9392 feet Casing Length Size Conductor 125' 20" I nte rmediate 2652' 13-3/8" Production 10662' 9-5/8" Plugs(measured) Junk(measured) Cemented 225 sx AS 5500 sx PF II 1000 sx 'G' Measured depth True vertical depth 125' 125' 2725' 2724' 10735' 9428' RECEIVED Perforation depth: measured 10154-10194' true vertical 8930-8965' MAR ! 1 i99 Alaska Oil & Gas Cons. CommiSSiO;' Anchorage Tubing (size, grade, and measured depth) 5-1/2", 17#, N-80, NPC @ 9646' MD; 4-1/2", 12.6~, N-80, NPC @ 9754' MD Packers and SSSV (type and measured depth) Baker SAB packer @ 9625' MD; Camco BaI-O SSSV @ 2187' MD 13. Stimulation or cement squeeze summary Intervals treated(measured) Well was perforated Treatment description including volumes used and final pressure 14. Representative Daily Averaqe Production or Iniection Data OiI-Bbl Gas-Md Water-Bbl Casing Pressure Prior to well operation 1892 14761 2312 .... Subsequent to operation 2165" 18394 2389 .... Tubing Pressure 1002 1050 15. Attachments Copies of Logs and Surveys run Daily Report of Well Operations 16. Status of well classification as: Oil x Gas Suspended Service 17. I hereby certify that the foregoing is true and correct to the best of my knowledge· Signed ~/~~ ~' (~~~ Title Senior Engineer Form 10-404 Rev 06/15/88/'- - ~. ~ %AI~II~,~AII~ I~rt~-~rl Il/IA/ D~lr~ REPORT OF WELL OPERA~ONS DS 1-13 AP1 # 50-029-20270 ARCO Alaska, Inc. perforated the subject well within the Sadlerochit interval as follows: INTERVAL SPF ZONE COMMENTS DATE 10160-10177' MD 4 4 RePerf 2/7/93 Depths referenced to SWS BHCS 12/23/77. RECEIV .D Alaska Oil ,~ Anchorage P.O.Box 100360 Anchorage, Alaska 99510 DATE: 7-7-93 REFERENCE: ARCO CASED HOLE FINALS 7 ~° ~sJ3'25 4-40 416-15 10-12-92 Perf Record R,m 1, 5" HLS 8-15-92 Perf Record Run 1, 5" HLS 8-15-92 Perf Record Run 1, 5" HI~ 9-19-92 Perf Record Run 1, 5" HLS 5-2-92 GR/Temp Log R,m 1, 5" HIS 10-17-92 Perf Record Run 1, 5" HLS 8-21-92 Perf Record Run 1, 5" HLS 8-22-92 Perf Record Run 1, 5" HLS 6-23-92 GR/Perf Record Run 1, 5" HLS 10-19-92 Perf Record Run 1, 5" HLS 8-11-92 Perf Record Run 1, 5" HLS 10-16-92 Perf Record Run 1, 5" HLS Please sign and return~attac~A~opy as receipt of data. RECEIVED ATO-1529 eIB 0 ~ B~5 Trans# 93005 # CHEVRON D&M # EXTENSION EXPLORATION # EXXON MARATHON # MOBIL # PHILLIPS PB WELL ~ R&D # BPX # STATE OF ALASKA TEXACO * The correct API# for 3-34A is 50-029-21132-01. ** The correct API# for 7-4A is 50-029-20292-01. STATE OF ALASKA ALASKA ~-~ AND GAS CONSERVATION REPORT UF SUNDRY WELL OPEHATIONS 1. Operations performed: Operation shutdown Stimulate Plugging Perforate X Pull tubing AItercasing Repairwell Other X 2. Name of Operator ARCO Alaska, Inc. 3. Address P.O. Box 100360, Anchorage, AK 99510-0360 4. Location of well at surface 662'S & 733' E of NW cr, Sec. 8, T10N, R15E, UM At top of productive interval 1301' N & 1116' W of SE cr, Sec. 7, T10N, R15E, UM At effective depth At total depth 1006' N & 1375' W of SE cr, Sec. 7, T10N, R15E, UM 5. Type of Well Development Exploratory Stratigraphic Service 6. Datum of elevation(DF or KB) 73' RKB 7. Unit or Property Prudhoe Bay Unit 8. Well number 1-13 9. Permit number/approval number 77-59 10. APl number 50 - 029-20270 11. Field/Pool Prudhoe Bay Oil Pool feet 12. Present well condition summary Total depth: measured true vertical 10740 feet 9432 feet Plugs(measured) Cement Plug @ 10200' MD Effective depth: measured true vertical Casing Length Conductor 125' Sudace 2652' Production 10662' 10200 feet 8970 feet Junk(measured) Size Cemented 20" 225 SX AS 13-3/8" 5500 sx PF II 9-5/8" 1000 sx G Measured depth True veHicaldepth 125' 125' 2725' 2724' 10735' 9428' RECEIVED OCT 2 6 1992 Perforation depth: measured 10154-10164'; 10177-10194' Alaska 0il & Gas Cons. Commissio[~ true vertical 8930-8939'; 8950-8965' Anchorage Tubing (size, grade, and measured depth) 5-1/2", 17#, N-80, NPCT @ 9646' MD; 4-1/2", 12.6#, N-80, NPC tail @ 9754' MD Packers and SSSV (type and measured depth) Baker SAB packer @ 9625' MD; Camco Bal-0 SSSV @ 2187' MD 13. Stimulation or cement squeeze summary Intervals treated(measured) See attached. Treatment description including volumes used and final pressure 14. Prior to well operation Subsequent to operation Representative Daily Average Production or Injection Data OiI-Bbl Gas-Md Water-Bbl Casing Pressure 1783 13276 8454 -- 2212 ~' 11834 3831 -- Tubing Pressure 983 277 15. Attachments Copies of Logs and Surveys run Daily Report of Well Operations 16. Status of well classification as: Oil x Gas Suspended Service 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed Title Sr. Area Operations Engineer Form 10-404 Rev 06/15/88 Date SUBMIT IN DUPLICATE 1-13 DESCRIPTION OF WORK COMPLETED CTU CEMENT SQUEEZE/PLUGBACK FOR GAS/WATER SHUTOFF 9/21/92: RIH & tagged bottom at 10380' MD. 9/25/92: An Acid Wash & CTU Cement Squeeze were performed for Water & Gas Shutoff as follows: MIRU CTU & PT equipment to 4500 psi. Loaded wellbore w/Hot Seawater & RIH w/CT to reciprocate an acid wash across the open perforations at: 10150 - 10200' MD (Z4) 10236 - 10256' MD (Z3) Ref. Log: BHCS 12/23/77. Pumped 47 bbls 12% HCI w/10% Xylene, followed by 22 bbls 1% KCI Water, followed by hot seawater circulated to displace acid. Pumped 10 bbls 1% KCI Water, then switched to cement. Pumped 15 bbls of Neat Latex Acid Resistive cement, followed by 40 bbls Latex Acid Resistive cement w/aggregate, & placed 13 bbls of cement behind pipe at 3500 psi max squeeze pressure, held 1 hour. Contaminated cement w/biozan & jetted cement from wellbore down to 10210' MD. Left a cement plug in the wellbore below 10210' MD. POOH w/CT. Rigged down. 10/12/92: Reperforated: 10154 - 10154' MD (Z4) 10177 - 10194' MD (Z4) Tagged top of cement plug at 10200' MD. Ref. Log: BHCS 12/23/77. Rigged down. Returned well to production & obtained a valid production test. RECEIVED OCT 2 6 199 Alaska Oil & Gas Cons. Commissio Anchorage REPORT uF SUNDRY WELL OPEHATIONS -:1. Operations performed: _ STATE OF ALASKA ALASKA" .AND GAS CONSERVATION CC~--'/IISSION Perforate Operation shutdown Stimulate Plugging X Pull tubing Alter casing Repair well Other 2. Name of Operator ARCO Alaska, Inc. 3. Address P.O. Box 100360, Anchorage, AK 99510-0360 4. Location of well at surface 662' S & 733' E of NW cr, Sec. 8, T10N, R15E, UM At top of productive interval 1301' N & 1116' WOF SEcr, Sec. 7, T10N, R15E, UM At effective depth At total depth 1006' N & 1375' W OF SE cr, Sec. 7, T10N, R15E, UM 5. Type of Well Development Exploratory Stratigraphic Service 6. Datum of elevation(DF or KB) 73 RKB feet 7. Unit or Property Prudhoe Bay Unit 8. Well number 1-13 9. Permit number/approval number 77-59 10. APl number 50 - 029-20270 11. Field/Pool Prudhoe Bay Oil Pool 12. Present well condition summary Total depth: measured true vertical 10740 feet 9432 feet Plugs(measured) Effective depth: measured true vertical Casing Length Condcutor 125' Intermediate 2652' Production 10662' 10693 feet 9392 feet Junk(measured) Size Cemented 20" 225 sx AS 13-3/8" 5500 sx PF II 9-5/8" 1000 sx 'G' Measured depth True vertical depth 125' 125' 2725' 2724' 10735' 9428' RECEIVED Perforation depth: measured 10150-10180'; 10180-10200'; 10236-10256' MD true vertical 8927-8953'; 8953-8970'; 9001-9018' TVD SEP 1 0 1992 Alaska Oil & Gas Cons. Con:rnissior' Anchorage Tubing (size, grade, and measured depth) 5-1/2", 17#, N-80, NPC @ 9646' MD; 4-1/2", 12.6#, N-80, NPC @ 9754' MD Packers and SSSV (type and measured'depth) Baker SAB packer @ 9625' MD; Camco BaI-O SSSV @ 2187' MD 13. Stimulation or cement squeeze summary Intervals treated(measured) Well was pedorated Treatment description including volumes used and final pressure 14. Prior to well operation Representative Daily Average Production or Injection Data OiI-Bbl Gas-Md Water-Bbl Casing Pressure 2179 18784 2410 .... Tubing Pressure 1416 Subsequent to operation 2227 19262 9843 743 15. Attachments Copies of Logs and Surveys run Daily Report of Well Operations 16. Status of well classification as: Oil x Gas__ Suspended Service 17. I hereby cedify that the foregoing is true and correct to the best of my knowledge. Signed ~--~~ ~. ~ _. Title Senior Engineer Form 10-404 Rev 06/15/88// /// cc: S. Wallace/DS Enor/J. W. Peirce Date ~/~ SUBMIT IN DUPLICATE REPORT OF WELL OPERATIONS DS 1-13 APl # 50-029-20270 PERMIT 77-59 ARCO Alaska, Inc. perforated the subject well within the Sadlerochit interval as follows: INTERVAL TVD ZONE COMMENTS DATE 10236-10256 9001-9018 3 ADPERF 7/18/92 RECEIVED 1~0~ SEP 1 0 ~,,,~,~. ,. ,, , ~2~ ~ Alaska Oil & Gas Cons. (,~j,~u~,s,,,,,. Anchorag, ARCO Alaska, Inc. P.O.Box 100360 Anchorage, Alaska 99510 DATE: 7-31-92 REFERENCE: ARCO CASED HOLE FINALS 1-4 ~o ~>~ 7-12-92 CCL/Perf Run 1, 5" 1-13 2~ 7-18-92 CCL/Perf Run 1, 5" 2-31 7-6-92 Prod/Press/Spin/Temp/Trap Run 1, 5" 3-10 2~-~/ 7-6-92 CCL/Perf Run 1, 5" 3-35 7-13-92 C~L/Perf l~_m 1, 5" 9-9 ~"~ 7-12-92 CCL/Perf Run 1, 5" 9-11 ?~o~/ 7-13-92 CCL/Perf Run 1, 5" 11-7 g/-/~ 7-11-92 CCL/Tubing Cutter R~_m 1, lI1-16ST 5-30-92 MAI Acoustic Filtered Waveforms Run 2, 5" 1-16ST 5-30-92 BHC MAI Comp Slowness Curves Run 2, 12-6A ?.l -~r'~/ 7-11-92 PFC/GR Run 1, 5" 15-9 7-13-92 Collar/Perf Run 1, 5" 15-28 ~ ~/y~ 7-12-92 PFC/GR. l~_m 1, 5" 17-3 7-12-92 CCL/Perf Run 1, 5" NGI-11 7-19-92 CCL/Tubing Cutter Run 1, Please sign and return the attached copy as receipt of data. RECEIVED BY .~~~_~_ ~___ _ .. Have A Nice Day! Sonya W~ll~ce ATO-1529 APPROVED Trans # 9217~- Atlas Atlas Sch Atlas Atlas Atlas Atlas Atlas Atlas & ~' Atlas Atlas Atlas Atlas Atlas Atlas # CENTRAL FILES # CHEVRON D&M # EXTENSION EXPLORATION # EXXON MARATHON # MOBIL # PHILLIPS PB WELL FILES R&D # BPX # STATE OF ALASKA TEXACO R£cEIVED AUG 1 0 1992 Alaska Oil & G~s corm. Commission Anchorage ARCO ALASKA, ~NC, F' ,0- BOX AI-ICHOI:::AGE' AL..ASKA 995~ 0 DATE]: f'~l:;',CO CA,.qli::D HOLE F IN(~L$ .... · ~ S ~ ~ '"'~:' .... 6"-'6 ~ '"'" "" ..... , .) c;~ .... ~.~:, 6 .... ~'~ ~ ~-" ........ (.:, '-- ~.. x, 7 .... ~ 3 ~ 2-'~ (~."'90 9--27 ~ 2'-3'! .-90 C i'1L / F' I) l< O"," iix F', I... f':~ Y F'OROSITY I::'F:OM F'DK F'E~RI:: F.'.EJ'~O [;:I> F'I) K .... ~0('3' DIFF~rCURR' {::'l!i~ [(l::' [.:'Ol:;.'.O 3 I'1' Y [:' RO}~t F' I W 6. 1 E I:;',F L O W T D T "- F" CCL I:::E C:E ]'. v i::. L B Y HAV[:it A NIC. E DA"f! ~"~ S' [<E:.£,: ]: F'T A[:'F'ROVEI~ 'fRANS:".: 9 ~ I) '1: .?; 1' I:;: I !.:.~ U T I O N · "- F' H I L L. ]: I":' 3' t::' I'?, W E: t..I... [:' I L. E: ~, I:;: & D ,'.'; 1 (~'l' E O I::' g~t- A $ l< A 'I'EX(~CO RECEIVED JAN 1 4 1991 Alaska Oil & Gas Cons. Commission Anchorage 995 i O. DATE' i 2- 28- 9.".") A N D F;..' E T U R i".! T H i'E A T T A ~":: H E D C 0 P Y JL. I':', .,,- A £ ,r.;.: Iii: C E.T P T 0 F' D A '¥' A, RECEIVED BY H A ',,.," E A N t C E DAY'! ",-'" .q ~...' ! .q ? ,~;:, (.) 742 i 4 4/02 D ]: ~..' T F-:.'. ]: B ij 7' ]: 0 N ~'"' ii["i"l'' '::'''~, .: ,. ,,_ ,~::'~.:. i... E ::':.' ,' ~" i..~ '; ,..: .:.-. ..._., , .. C i-'{ E VF.' C i'-..! ~'.':-' ~ %.-.. 'l"fi i, ii";,.;- ~.~t".L..:':~:.~": '. '--;:.-': '., '-.' , ..... t.-. ?:. 'X U i:.~ i'"'i i'-.] !:< I'::'~ i i"! LJ r'-.! ~"i {"J ,,_-'-: ! L. RECEIVED JAN 9 1991 Alaska Oil &eas C~ns. Commission Anchorage ARCO ALASKA, INC P. 0 · BOX t ANCHORAGE, ALAS'K A 995t DATE' i i .-¥0--9C, REFEI';,'ENCE' ARCO CA'£ED HOI._E F:;rNAL*:: / i-i('~ i i--24-9¢ DUAL BUI:;,:2'i" TDT-F'' t -i 2 'i i -23-9¢ F'DK-i ¢¢/C-R/CCL. / i -.i S i t -24-9C, F'DK-i C,¢/GR/CCL/TEMP '/ 3-2,...,': i i -2;3-9¢ COLLAF;:/PERF"' / 6-7 i i.-25-90 DUAl_ I-i:LJl:;~,~;']" TDT-P "' 7-29 t i -i 7-90 CCL/F'ERF-' 9-'.3 t t '-22-90 VFRI"II_OG ~' 9-4 i i i -2'2-9'3' CBT 9-4 i i i "'22-'9(~:' CET '" 9-:42 t i --2t -9'3' CBT .'" ~;'-'42, i i -'°i.-_ -9¢ CET / 9 '-' 46 i i --":2 '2 -9 ;b C B '? -- 9 ..... t 6 i i - 22-9':'} C F T'-- 4, i "-"::' "~- ,.. ,., 4. 4, -.'i, 9-- c.: ;:''', .... 'f' E ?'i 1:' ~'~" ~ ~ l::' V E Y,...., -'" i .~-.'-::.'. i i '-' i U-'V¢ C':CL/PERF: -- i2--8B !0--22--9¢ CCL 2TRIF:' TO 2'ET C.?:,'L]- ..,-'2. t i ....-~_.c~,:.-:,~._ , .. TFZMF:' ~:Ui:;:. v EY -' i~--4 'fl--i"- o~.~ · -:-- ,- u COL. LAR/PERF"-- i ~=' "- 'T" i i:;,; ,' = " ..:, 2i 'i. ":;-.'""";i,, ...._o;:;,..., 1'EM;F:' ..,t....,... ~, t_.t i 6-'i 9 i t -'t '7-9¢ F'EF;,'F RECOF;.:D F:'I._EAZE' :_:':;IGN F'-,ND RE]"UR;*,~ '1'HI:-' A"i"i'RCJ-i[:~D Ci'i!..'¥ ,?.Ai...I...Y HOF:'F:'EC_:K EF;.'. A T 0 - .'i, _;. ,..,:-- '-. ,'.:., A~i: RI_:::CE I F'T RUN 9, 5' RU?,.I i, 5" RLJN i, _.'." RUN i , 5' RUN t, 5' RUM i, .5 ' I:;..'UN i , .5:" RUN 2, ..,':~" RUN o 5 ' R U N '2 ": ' R lJ i"-I "~ ~' ' F~lJi"!f , 5' R U Fi.t , 5" RUN i, 5." F...'tJi'.! i , 5:" F< U N i , 5" RUN i , 5" RUN t , ~ · F(lJi"-~ i , .,.~ * R I..j ¢....I i., 'j~ ~ [F' DAi"A. APF:'F;..'O;:' ..... ;~r~"'w" ~~ v C:..b ,/. ....... '1- R A N ~:-¢~ 9,:~ 'I. 62 2CH ~"F I_ A A TLA~, ¢' A i"I..A,? 5.,' C I-.t A F I..,--, £' A T I_. A .? 2 C 14 £'Ckl $CH 2CH c'f-. ,., ,.. I-.I £'CH A-F L. ¢-~ :!; HL.Z H R ;~' A fl..A:? H I-,..' ~.: ~,.,' C H T I.-IIE AF'I ~: D I 2'!" F:, I BUT I ON · ~: CENTRAL FILES ~,-'"'C I..t E V R ~'~_. D & M "' r'"' EXTEN3:ZON E,,,F'L.)R~..~I' TON ~ EXXON MARATHON :I~ H 0 B t L · ,,-'"' F' H I L L I F' 2 F'B WELL F'IL_E:Z R & D -,. BF'X ~ STATE OF ALASKA TEXACO RECEIVED DEC 5 1990 Alaska 0il & Gas Cons. Commission Anchorage i) ATE' i .... Si .... 89 R iii: F' Ii!: R Iii: N E: E ' A R C 0 C A S E D i"t 0 t... iii: i:' ]: N A t... ,ff i .... 6-'-' L:i 9 P R 0 D LJ C 'T' i 0 N P F.'. 0 F: ]: L.. iii: i .... 4 "- 8 9 C 0 I... I... A R,." F:' ii!: F.'. F:' i .... i I -" i!i' 9 F:'i::.: 0 D U C T 71:0 N 1:" R 0 F: i I... fi!: · i 2 '"' 2 .:::!: '"' :iii 8 C 0 i... i... A R /F' Ii!: R F:' i "" i ~:' ";'" "':' .... "" ..;." ,:=, ';: F:' F;.: 0 D U C T :l: 0 N F:: F.: n ~.. ]: i... Iii: i .... i i~::: '"' :iii: 9 D I F:' F:' Iii: R ii!: N'i" :i: A i... 'i" E M F:' i "" ~ c: ..... ~:::' ::' T iii: i'"": F:' t ...... i 9-:~i~ 9 C 0 t_.t_ A tR /F:'li"' F.: F' i .... 2 i .... 8 9 C 0 I... t... A R' / F' Iii: R F:' i .... 6'"' 8 9 t... E A K D E 'f' Ii:' C t" :l: 0 N i - i .":~: - R 9 D ! F: F:' E R iii: N'i" :[ A I... "f' E H P 'i ..... :? .... 8 9 F' R 0 D U C '!" ]: 0 N P F;,' 0 F J_' I... !ii: i .... i ':.:.:'- 8 9 F:' F;.'. 0 D U C T :l: 0 N P R C1F:' I L E F:'LOWf'iETE:F;.: LE:AK DETE:Ci"ION "f' E ,e.i I::' F'Wi)WE~-i i 2 .... 24""8F'~ COt_t..AF;,'/F:'IF'F;.'.F' .... SE'T' I::'t_Ui~. i::' t.. Iii: A S t:'i: ,'!; I fJ N A N I) R F "f' LJ R N 'T 1..t Ii'.: A T T A C I..i Iii: D C 0 F' Y A,"_:.' R Iii: C: Iii. I F:' 'l" 0 F:' D A 'i"A ~ L'i. ti!i A F;'. []: A f'-i C [) C ~':':~ H C O A "f't... A ;? I ~... I"t ,.;. C A f"i C: C ~q f'i ]: C A i"i C O C A i:"i C O C A M C O C A M C: O ('.;. I!!: A i. F;..' Iii: IL'. E: ! V E D B Y ........................................................................ nr"~ ...... r ...... r, ,.__-6 t.98 SAI...L Y H ... "," I::.....k E -, ' A T O-i '.'~: 2 9 ~//Al~sk~ Oil & Ga~ Oe, ns. ¢ommi~ior, Arlohorag~ 'i" tR A N S ~: 8 9 (-) 4~ ..... ,i.1~ i, A F:' 1-.' t.,.. [' "Iii] ][: ..... ...?:~lh. ......... D I ,S' "1" R ]: B U 't" ]: 0 N ~ CENTtRAt.. t:' :t: L.E $ ,,-"" C I"I f.'i: V R O N D & M · .-""E.,.. t tEN ..'.:, I 0 N E X I=' L. 0 F;.: A "f' I 0 N ~ ti.::XXON iqAI:;~ATFtON ~' MOBZL · :,(. !-4 t... Y ( H A t.. I... ]; B t.J F;.'"f' O N 1... O C- 6 t N (.'.;- ,% E Fi: V :t: C E S ) :1: S "f' I.-I Iii: N E t,,.i N A M E I::' O Fi: G; iii: A 1:;.: I..I A I:i: T., :.~: .:,,:. 'f' I--t E A F' I :,I: O N '¥ t-.I I $ I._ O 6 I S I N C O tR R E C'f'; :[ T S H O U I... D B I:-': '.:5,.').-.. (-) 2 9 .... 2,.':.) '2'.5 4. ARCO Alaska, Inc. Prudhoe Bay Engineering Post Office Box 100360 Anchorage, Alaska 99510-0360 Telephone 907 263 4248 Donald F. Scheve Operations Engineering Manager October 13, 1988 C. V. "Chat" Chatterton Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Re: DS 1-13 Approval No. 8-390 Dear Mr. Chatterton: Attached is the Report of Sundry Well Operations detailing work per- formed on the above-referenced well. Very truly yours, · F. Scheve DFS/JMH/jp Attachment cc: Standard Alaska Production Company J. Gruber, AT0-1478 Pi(DS 1-13)W1-3 WELLS3/42 ARCO Alaska, Inc. is a Subsidiary of AtlanticRichfieldCompany AR3B -6132-C STATE OF ALASKA .... AL, ,A OIL AND GAS CONSERVATION COMMI,- DN REPORT OF SUNDRY WELL OPERATIONS t. Operations pedormed: Operation shutdown __ Stimulate __ Plugging __ Pedorate __ Pull tubing __ Alter casing __ Repair well ~ Pull tubing __ Other 2. Name of Operator ARCO Alaska, Tnc, 3. Address P. O. Box 100360, Anchorage, AK 99510 Location of well at surface 662' S & 733' E o£ ~ ct, Sec. 8, At top of productive interval 1301' N & 1116' W of SE cr, Sec. At effective depth 5. Type of Well: Development Exploratory Stratigraphic Service T10N, R15E, UM 7, TION, R15E, UM 1006' N & 1375' W of SE cr, Sec. 7, T10N, 6. Datumelevation(DForKB) 73' RKB 7. Uni[or PI;gperty~ame, .. ~ruanoe ~ay unzc 8. Well number 1-13 9. Permit number/approval number 8-390 10. APl number 50-- 0Z9-20270 11. Field/Pool R15E, UM feet Prudhoe Bay Oil Pool 12. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical Casing Length 125' 2652' 10662' Conductor Intermediate Production 10740 feet Plugs(measured) 9432 ~et 10693 feet Junk(measured) ~et 9392 Size Cemen~d 20" 225 sx AS 13-3/8" 5500 sx PF II 9-5/8" 1000 sx 'G' Measureddepth 125' 2725' 10735' .~uevedicaldepth 125' 2724' 9428' Pedor~ionde~h: measured 10150-10180'; 10180-10200' truevertical 8927-8953'; 8953-8970' ~bing(size, grade, andmeasumdde~h) 5½", 17#, N-80, NPC @ 9646' MD; 4~", 12.6#, N-80, NPC @ 9754' MD Packers and SSSV (type and measured depth) Baker SAB packer @ 9625' MD; Camco 13. Stimulation or cement squeeze summary Bal-0 SSSV @ 2187' MD Intervals treated (measured) Attached Treatment description including volumes used and final pressure 14. Prior to well operation Subsequent to operation Representative Daily Average Production or Injection Data OiI-Bbl Gas-Mcf Water-Bbt Casing Pressure 0 1644 6864 -- 2672 1912 782 Tubing Pressure 547 438 15. Attachments Copies of Logs and Surveys run Daily Report of Well Operations ..~ 16. Status of well classification as: Oil __ Gas __ Suspended __ 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Service Signed Title Operations Engineering Manager Date Form10-404Rev06~5/88 WELLS3/42 J. M. Heusser, 263-4266 SUBMIT IN DUPLICATE Objective: 6/15/88 6/21/88 6/22/88 7/11/88 Drill Site 1-13 COILED TUBING CEMENT SQUEEZE WATER SHUT OFF To shut off water producing perforations located both below and above a leaking bridge plug. Perform coiled tubing acid acid wash across the following intervals: 10100 - 10200' MD. The following treatment was pumped: 1) 2) 3) 115 bbls 12% HC1 dispersed with xylene 121 bbls 12-3% HC1- HF 123 bbls 12% HC1 RU coiled tubing. Fluid pack wellbore. Cement squeeze the following intervals with 61 bbls of cement: 10100 - 10130'MD 10150 - 10180'MD 10180 - 10200'MD Reference: BHCS 12-23-77 Contaminate cement. Wait on cement overnight. Reverse out contaminated cement to a depth of 10392' MD. Reperforated the following intervals: Reference: BHCS 12-23-77 10150 - 10180' MD 10180 - 10200' MD Reperf 4 spf Reperf 1 spf Returned the well to prodUction and obtained new well test. JMH' 10/6/88 ARCO ALA:YKA, INC. F'.O. BOX i-0036e ANCHORAGE, ALAS'KA DATE' 8-26-88 REF:'ERFNC;E"' ' ARCO CAS'ED HOLE t '-t 3 7-~ t -88 COLLAF;:/F:'IFF;.:1.: I',:UN 2-tA 8-1'7'-88 PERF RECORD RUN ~ ,:..,.) ¢ ,-..~.--td8 C[]LI_AR/F'ERI:' I'(lJi'-,t ;5-2t 8-t 8-88 COLLAR/PE1.;;F' ' RUN 5-2 8- t 6--88 COI_L. AR/TEi'41:' F;;Ut'4 5-6 8-5-88 F'RODUCTION PF.:or" i LE I'( U i'q 7-t..,":, ',:'-9-88 COLL..At-;;/'PI::RF RUM 7--28 8-20-88 PF'C RUN 7-":'9.. 8--'.~0--88.,.. I:-' F' C I.(I _ Ii'4 9- i 7-7-88 COL LAI:;:/F'Ei:;:t:' t 4-7, 8-i :5-88 I_..tFAK DI;£'TECTION I';.'.UM t 5-t 4 7-25-88 COLL. AI';;/I'"ERI"-' " RUM t 6- i' 4 8 / t 2- i 4 / 88 P F;,' 0 D U C"I' i 0 N P F;.: 0 F" G A,.S' L i t':' T 1:4 U H t 7-~ 8-t ¢'-88 QA;<.,' LIf-:'i' TFf'iP I';,'UM 'J 7-'~:J 8-i 0-88 I N...J ~RO 'i'!~i;i'4P F'L. OWMtFTER I:,:LJN t '7'-i 4 8-t i ..-88 . PI:;..'ODUCTiOt'4 I'.:'I:;;Ut::'.I~LF' I:(UM' t 8-t'6 8-.5-88 Pi'rS' F(LJN F'WDWt.--i '7-t8-88 COLLAR/PI::RF' I::'L. Ei:A.~;E£ ZIGN AND RE"t"LJRN 'i"H'E AT'i"ACHED COI';'Y A._'!: l-;,'ECl:i:II-:"f' (.)F: DAf'A, I;,'ECEI VIED BY HAVE A NICE DAY! F.¢~'/ ~ Alaska 011 & Gas Cons. Commission APF:'ROVE'D ~ Anchoraga D i S' T R .[ )~ U '1' I U N ~ CENTRAL I':' 1L.E,.~; ~: PI"I i L.L i P,.S' · 9 CI"tFVRON F'~'{ WEL. L. D & i~'1 t-( & D .9 EXTENSION EXPL. OI:;:A'fJ:ON :';:. £'AF'C ~: I:':: X X 0 N '~-J: ~",,' 'J' A '[' E 0 I::' A L_ R .'_'~' J.( A M A R A 'T I-4 0 N "" '/' E X A C 0 · "" HOBIL. ARCO Alaska, Inc. Prudhoe Bay ~.~gineering Post Office Box 100360 Anchorage, Alaska 99510-0360 Telephone 907 263 4248 Donald F. Scheve Operations Engineering Manager May 13, 1988 C. V. "Chat" Chatterton Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Re: DS 1-13 Permit No. 77-59 Dear Mr. Chatterton: Attached is the Application for Sundry Approval detailing work to be performed on the above-referenced well. Very truly yours, D. F. Scheve DFS/JMH/jp Attachment cc: Standard Alaska Production Company J. Gruber, AT0-1478 P1 (DS 1-13)W1-3 WELLS2/23 ARCO Alaska, Inc. is a Subsidiary of AtlanticRichfieldCompan¥ A R3L~, 6132- C -"-- STATE OF ALASKA .... ALASK OIL AND GAS CONSERVATION COMN, 31ON APPLICATION FOR SUNDRY APPROVALS 1. Type of Request: Abandon ~ Suspend ~ Operation Shutdown : Re-enter suspended well ~: Alter casing ,_i Time extension [] Change approved program [] Plugging [] Stimulate [] Pull tubing ~ Amend order ~ Perforate !:-] Other 2. Name of Operator ARCO Alaska~ Inc. 3. Address P.O. Box 100360, Anchorage, AK 99510 4. Location of well at surface 662' S & 733' E of NW Cr. Sec. 8, T10N, R15E, UM At top of productive interval 1301' N & 1116' W of SE Cr. Sec. 7, T10N, R15E, UM At effective depth At total depth 1006' N & 1375' W of SE Cr. Sec. 7, T10N, R15E, UM 5. Datum elevation (DF or KB) 73 ' RKB feet 6. Unit or Property name Prudhoe Bay Unit 7. Well number ]-13 8. Permit number 77-59 9. APl number 50-- 029-20270 10. Pool Prudhoe Bay Oil Pool 11. Present well condition summary Total depth: measured true vertical 10740 feet Plugs (measured) 9432 feet Effective depth: measured 10693 feet Junk (measured) true vertical 9392 feet Casing Length Size Cemented Measured depth Conductor 125' 20" 225 Sx AS 125' Intermediate 2652' 13-3/8" 5500 Sx PF II 2725' Production 10662' 9-5/8" 1000 Sx 'G' 10735' ~ue Verticaldepth 125' 2724' 9428' Perforation depth: measured 10100-10130'; 10150-10180'; 10180-10200' true vertical 8884-8910'; 8927-8953'; 8953-8970' Tubing (size, grade and measured depth) 5~", 17#, N-80, NPC @ 9646' MD; 4~", 12.6#, N-80, NPC @ 9754' MD Packers and SSSV (type and measured depth) ~aker SAB Packer @ 9625' MD; Camco Bal-0 SSSV @ 2187' MD 12.Attachments Description summary of proposal ~ Detailed operations program BOP sketch 13. Estimated date for commencing operation April 1988 14. If proposal was verbally approvedh:.~b2cc.,:n.~ ~.¥~, ~ ~<.::.~-.~ ..... ~) iO_~uk_gqf Name of approver o:a 7~o~'r~ l~ ~ -__~.O~ ~ ~..~~ Date approved 15. I hereby, certify that the foregoing is true and correct to the best of my knowledge Signed ,I~~//~~¢.~__.~. Title Operations Engineering Manager Commission Use Only Date Conditions of approval Approved by oRIGINAL SIGNED BY LONNIE C. SMITH Notify commission so representative may witness ~ Plug integrity ~ BOP Test ~ Location clearance Approved Copy Returnc?d .~ Commissioner the commission Dat //~-- Form 10-403 Rev 12-1-85 WELLS2/23 J. M. Heusser, 263-4266 Submit in triplicate~ PRELIMINARY COILED TUBING UNIT WORKOYER PROCEDURE Drill Site 1-13 Water Shut Off . , . RIH with CCL. Make tag run to confirm current TD. RIH with CTU. Clean fill and perform pre-squeeze perforation wash. Note any change in production. As this well has produced at a high water cut for approximately the last year, multiple acid washes may be required. Repeat as necessary pending any significant gain in oil rate resulting from an acid wash. Perform coiled tubing unit cement squeeze on all intervals. Volume of cement on location will be sufficient to cover perforations from the original PBTD (10693' MD) up through the uppermost existing production perforations at 10100' MD. Contaminate cement in wellbore. woc at least two weeks Perforate the well as follows: EXISTING PRE-SOUEE2~ POST SOUL~2~ P~m~RAT~ONS 10100 - 10130' MD 10150 - 10180 10180 - 10200 10448 - 10488 10498 - 10515 10529 - 10537 10539 - 10557 10571 - 10629 4 spf Open 4 Open 4 Open 4 Below Bridge Plug 4 Below Bridge Plug 4 Below Bridge Plug 4 Below Bridge Plug 4 spf Below Bridge Plug 10100- 10130'MD ** 10150 - 10180 10180 - 10200 4 spf 4 spf 1 spf ** Note these perforations from 10100 - 10130' MD will be reperforated once well drill site 12-20 has established zone 4 injection. The timing of these perforations is expected to be during third or fourth quarter 1988. Reference log · BHCS 12/23/77 Wellbore fluid at time of reperforation: seawater Reservoir Pressure: 3736 psia 6 5 4 3 2 1. 5000 PSI 7" WELLHEAD CONNECTOR FLANGE 2. 5000 PSI 4 1/16" PIPE RAMS 3. 5000 PSI 4 1/6" HYDRAULIC SLIPS 4. 5000 PSI 4 1/6" SHEAR RAMS 5. 5000 PSI 4 1/6" BLIND RAMS 6. 5000 PSI 4 1/16" STUFFING BOX A^~, PI"~ "l''ll'~lt, li'~ 'tkll'l' §j'lrt Ci"illTC)kl~'l[l'r 4 ' 5 J 2 1. 5000 PSI 7" WELLHEAD CONNECTOR FLANGE 2. 5000 PSI WIRELIN£ RAMS (VARIABLE SIZE) ,,3. 5000 PSI 4 1/6" LUBRICATOR 4. 5,000 PSI 4 1/6" FLOW TUBE PACK-OFF Id ! REL ! NE BOP EOU ! PMENT STATE OF ALASKA ALASK, ..)IL AND GAS CONSERVATION COMM. .,ION APPLICATION FOR SUNDRY APPROVALS 1. Type of Request: Abandon - Suspend ~ Operation Shutdown ~ Re-enter suspended well ~ Alter casing '~ Time extension [] Change approved program [] Plugging [] Stimulate [] Pull tubing [] Amend order [] Perforate ~ Other 2. Name of Operator ARCO Alaska~ Inc. 3. Address P.O. Box 100360, Anchorage, AK 99510 4. Location of well at surface 662' S & 733' E of NW Cr. Sec. 8, T10N, R15E, UM Attop of productiveinterval 1301' N & 1116' W of SE Cr. Sec. 7, T10N, R15E, UM Ateffective depth Attotaldepth 1006' N & 1375' W of SE Ct. Sec. 7, T10N, R15E, UM 5. Datum elevation (DF or KB) 7;3,' RKB 6. Unit or Property name Prudhoe Bay Unit 7. Well number 1-13 feet 8. Permitnumber 77-59 9. APl number 50-- 029-20270 10. Pool Prudhoe Bay Oil Pool 11. Present well condition summary Total depth: measured true vertical Effective depth: 10740 feet 9432 feet Casing Conductor Intermediate Production measured 10693 true vertical 9392 Length Size 125' 20" 2652' 13-3/8" 10662' 9-5/8" Plugs (measured) feet feet Junk (measured) Cemented 225 Sx AS 5500 Sx PF II 1000 Sx 'G' Measured depth 125' 2725' 10735' ~ue Verticaldepth 125' 2724' 9428' Perforation depth: measured 10100-10130'; 10150-10180'; 10180-10200' true vertical 8884-8910'; 8927-8953'; 8953-8970' Tubing (size, grade and measured depth) 5~", 17#, N-80, 'NPC @ 9646' MD; 4½", 12.6#, N-80, NPC @ 9754' MD Packers and SSSV (type and measured depth) Baker SAB Packer @ 9625' MD; Camco Bal-O SSSV ~ 2187' MD 12.Attachments Description summary of proposal [] Detailed operations program BOP sketch 13. Estimated date for commencing operation April 1988 14. If proposal was verbally'approved Name of approver Date approved 15. I hereby, certify that the foregoing is true and correct to the best of my knowledge Signed ,1~'¢~~--/~~ Title Operations Engineering Manag.?r Commission Use Only Conditions of approval Notify commission so representative may witness Approved by ~ Plug integrity LoNNiE C. SMITH - BOP Test % Location clearance ,,pp~'oved Copy ~eturned ~ Commissioner IAppr°Val N°' ~ .._~ ~ the commission Date '~'-~'/' Form 10-403 Rev 12-1-85 WELLS2/23 J. M. Heusser, 263-4266 Submit in triplicate PRELIMINARY COILED TUBING UNIT WORKOVER, FROCL~_ URg. Drill Site 1-13 Water Shut Off . . RIH with CCL. Make tag run to confirm current TD. RIH with CTU. Clean fill and perform pre-squeeze perforation wash. Note any change in production. As this well has produced at a high water cut for approximately the last year, .multiple acid washes may be required. Repeat as necessary pending any significant gain in oil rate resulting from an acid wash. Perform coiled tubing unit cement squeeze on all intervals. Volume of cement on location will be sufficient to cover perforations from the original PBTD (10693' MD) up through the uppermost existing production perforations at 10100' MD. Contaminate cement in wellbore. WOC at least two weeks Perforate the well as follows: EXISTING PRE-SO~ POS"F SOUEI="~. PERFORATIONS 10100 - 10130' MD 10150- 10180 10180- 10200 10448- 10488 10498- 10515 10529- 10537 10539- 10557 10571- 10629 4 spf Open 4 Open 4 Open 4 Below Bridge Plug 4 Below Bridge Plug 4 Below Bridge Plug 4 Below Bridge Plug 4 spf Below Bridge Plug 10100 - 10130'MD ** 10150 - 10180 10180 - 10200 4 spf 4 spf I spf ** Note these perforations from 10100 - 10130' MD will be reperforated once well drill site 12-20 has established zone 4 injection. The timing of these perforations is expected to be during third or fourth quarter 1988. ReferenCe log · BHCS 12/23/77 Wellbore fluid at time of reperforation: seawater Reservoir Pressure' 3736 psia 6 5 4 3 2 1. 5000 PSI 7" WELLHEAD CONNECTOR FLANGE 2. 5000 PSI 4 1/16" PIPE RAMS 5. 5000 PSI 4 1/6" HYDRAULIC SLIPS 4. 5000 PSI 4 1/6" SHEAR RAMS 5. 5000 PSI 4 1/6" BLIND RAMS 6. 5000 PSI 4 1/16" STUFFING BOX 2 1. 5000 PSI 7" WELLHEAD CONNECIOR FLANGE 2. 5000 PSI WlR£LIN[ RAMS (VARIABLE SIZE) 5. 5000 PSI 4 1/6" LUBRICATOR 4. 5000 PSI 4 1/6" FLOW TUBE PACK-OFF .Id ! REL ! NE BOP EOU. ! PI,lENT. . ARi-~!] ALASKA: : ': ~'' . Ic-'.. O., B[I¥ I O¢~7~F,¢ ¢,NCI--I[}RAG El: At..A,?I< A ARCO CASED 14F)t...F' F'I'NAI S-- i ;3; ---2 S .... 4 4 .... i 2 i 5- '4 i '.:'.'; .... ,0, '7 ..... I· ...,"z i '7-. i '7 i i T*i .... ~ i '7 .... i PI.. F'A?.E' .Cl' !4AVF' A ?'J'[ .. /'~ .. C:.f'lt I AR'/F'!.-.-R'FF~:A'TTf]kJ i -7% ..... A.--R'7 . . . ' .. i .... .A.. ~...- q'7 [.'. RI.. I.. ~ R / F' F r-;' r.:' 0 Fi, ~ T T C'~ ~'J F:. O !. I. f'; O!. ! C f'll.. !.. f": fi I... t. I-: f'/!. !. F'. F!!. I. F: n l. 1 f-: f'l I.. I AR/F'EF.'F'flR'A'¥ l' flN A R / !::' El f;' F' 0 R A 'T T Fl ~,J AR' / F'!!: I:? I::' [I R' A T T Rid A R / F:' I:{ F? F' F) R' A T T fq FJ · A F';: / P Fi R' r-:' CI R' A T T fi N A t:;.' /F' E~ t;.' I::' FI R' A T '[ AR/Pr. rRr.:'CtR~ T T AR/F'F'RFOF;:AT 1' flN · P., F;~ A F;.'/F' F- R' F' FI R' ~ 'f' 1' fl N A F-,.' /F:' F' F;' F' [! r.;: A T T F1 ~J 6N AND RET 'N~..Cf':~,tE "TACi-7t} f"- .~.? R'Ff.'.FTF' N E 'T' T "r'^, F;'. A ~'J.. ,'.? .,q: ,..,c~ Ft t 6 '7 ,-, F:' F' F? fl) 'v' F' f! ................................................................................ 'f.',' '1; ,5," T F;t T RI t'r 1' f'l tg T) A 'T A, A'T'i A'TI A .".:; ATt A.?. ATI A .".? A'T'I A .'.;' A TI ~':':, ;:-:.' ATI A'T'I A 'TI A..,'" ATt A"f'l A'f'l AT'I A.c'' A'TI A .::,' A'T'I A 57 :'~ f'; t::i N 'T' !:? A I... F:' T I. I!:i .'C '~": F:' ~-I '[ ! . ! T F:' .? ~. f'it4 E' V R!f'IN F:' f:-,' klF'l ! ~ FYTEN,.? T Oi, J FYF' F1F;tA'T' 1' rit',J ,~: .?AF'Fi MAR'Al'NON .,~ 'T' g'.g A f': I"l F.' T I. F.' ? Al. A~:t< A ARCO AL~K~ TNR~ ANCHORAGE, AI...ASKA 975i0 DATE: 2-t&-RR REFERENCE: ARCO CA~ED HOLE FINAl. PR . PRFI...E/FM/TP/FO/W Fl DWMET£R PRD.PRFLE/FM/TP/FD/W RI.IN t, 5' PRD..PRFIE/HPFM/TFMF'/DFN RIIN t, '~' PRD,PRFL. E/HPFM/TEMP/DEN/WHilT RIJN t, ..5' P.TT,~'/TEMP RIIN t, '~' PIT..~/GR/TEMP RI.IN 9, 5' .. PITS' .-.~'r..'-.""~::,'-~ RJ~ 7, '~' PIT~/TEMP ~ ~ ~' ':' t, 5' ~.r-~" ['c,-.~'( ~- } - ~ RUN t , 5' PIT.~/TEHP PRO ~ PRFLE/HPFM/WHLL~. ,Oil & Gas Cons. Commis:;.iRUN ~, 5' F'RD. PRFLE/HPFM/W~I[T~:~'F.R ~choraGe RUN ~, .5' GAMMA RAY PRD.PRFL. E/HPFM PRD.PRFLE/$PIN/TEMF'/WHtJT INJ.PRFLE/FH/TP INJ.PRFLE/HPFM/TEMF' P~T£/TEMP PRODUCTION PROFILE ~,, ,~r,/~, z,,pUT F'RD, PRFL.~./~F'I,~,, ,~.,~ ...... *. ~ , PRO. PRFLE/HF'FM/GR/WHIJT INJ.PRFLE/HPFM INJ,PRFLE/HPFM RI.IN RUN RUN RUN RI.IN RUN RUN RLIN RUN RUN CAMCO CAMCn CAMCD CAMCn CAMCA CAMCO CAMCO CAMCD CAMCO CAMCn CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO PLEA.~E SIGN HAVE A NICE DA ' ..... ,..., . PEGGY BENNET ~F'~ov~~ ............. Z__ ~Y ..... , CHEVRON PR [ EXTE~SZO~ EX~L. DR~T~DN [ ~F'e MARATHON P.Oo BOX t~0S68 ANCHORAGE, ALASKA DATE' 2-i6-88 REFERENCE: ARCO CA~ED HOLE FINAl._ t-4 t-46 t-49 ~ -2~ t -2~ 4-7 4-t?i 4-22 9-S4 tl-48 t 4-22 t6-2 t6-5 {6-i9 t6-t9 i 6-2G t7-2 4-22-88 4-2t-88 t-20-R8 ~-20-88 t-24-88 2-4-88 2-S-88 t-29-88 2-5-88 4-2S-88 t-24-88 4-2S-88 ~-27-88 4-25-88 t-28-88 2-t-88 ~-28-88 t-29-88 t-31-88 ~-. ....-88 4-25-88 PR , PRFI...E/FM/TP/FD/W RUN Fi.. OWMETER RIIN PR.D,, PRFLE/F'M/TP/FD/W RUN PR'Il., PRFL E/HPFM/TEMF'/DEN RI. IN PRO ~ PRFI_.E/HPFM/TEMP/DEN/WH!.IT RUN P.T T,~/TEMF' RI. IN F'IT,.9/GR/TEMP RI.IN PIT,? RLIN F'I T,.~/TEMP RI.IN F' I T..~ R'LIN FI_OWMETER RIJN PIT,~/TEHP RLIN PRD., F'RFL. E/HF'FM/WHLIT R. IJN F'RD .. F'RF LE/HPFM/WHLIT/(", R RL!N GAMMA RAY RUN PR.O, F'RFLE/HPFM RLIN PRD, F'RFLE/$PIN/TEMF'/WHUT RUN I N,..! , F'RFLE/F'H/TP RUN I NJ ,, PRFI_E/HPFM/TEMP RUN P ]' T,9/TEMP RLIN F'RODUCTION PROFILE R. UN PR.D, F'RFL. E/SF'IN/TEHP/GR/WHUT RL!N F'RD ,, F'RFLE/HF'FM/GR/WHUT RLIN INJ., F'RFL E/HPFM RUN INJ ,PRFLE/HPFM RUN F'LEA.gE 5'IGN ANI) R'ETUR~ THE~=~TTACHEI) COF'Y A,S' R'~//~iF'T OF' PA RECEIVED BY ____ __~,._t~~ HAVE A N I C E ~'~-r~/Absks Oil & Gas 6ons. Commiss,o~ PEGGY BE NNE'~%,,mm~~ ..... A~chorag~ ATO- t ..529 TRAN,~ ~881 APPROVED DI~TRIB[ITION CENTRAl_ F I I_E,9 ¢ PHI I_.1._ I P,~' CHEVRON PR WELL. FTI_ D & M R. & P EXTEN.~' I ON EXF'I... OR'ATI ON · ,~AF'C EXXON ,,~' ,S'TATE OF Ai..A~KA MARATHON · TEXACO MOBIl_ TA, CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMI}O CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO P~ O o BOX ANCHORAGE, ALASKA DATE: 2 REFERENCE - t 6-88 '-- ~ ,- : ARCO CASED HOLE FINAl_ t-4 1-t6 t-t9 t I -2S 4-7 4-tR 7-t3 9-54 tt-t8 t~-t t~-~? t S-28 t 4-on t6-2 t6-5 t6-t9 ~ 6-2~ t7-2 17-8 t7-f0 PLEASE S RECEIVED HAVE A N t-22-88 t-22-RR t-2t-88 t-?O-RR t-2G-88 1-24-88 2-4-88 2-3-BR~ 1-29-88 2-5-88 t-23-88 t-SD-88 t-,_4-88 t-2~-88 1-22-88 t-27-88 t-25-88 t-28-88 ~n-t-88 t-28-88 t-2~-88 t-~1-88 t-25-88 PR~PRFt...E/FM/TP/FD/W FI. OWMETER PRD,PRFLE/FM/TP/FD/W PRD,PRFLE/HPFM/TFMF'/DFN PRD,PRFL. E/HPFM/TEMP/I)EN/WHIIT PIT~/TEMF' F'ITS/GR/TEMP PIT~ F'ITS/TEMF' F'IT~ FLOWMETER PIT~/TEMP PRD~F'RFLE/HF'FM/WHUT F'RD,PRFLE/HF'FM/WH[IT/~R GAMMA RAY F'RD~F'RFL. E/HPFM PRD~PRFLE/$PIN/TEMF'/WHUT IN,J~F'RFLE/FM/TP INJ,PRFLE/HPFM/TEMF' PIT~/TEMP F'RODUCTION PROFILE F'RD,F'RFL. E/~F'IN/TEMF'/~R/WHUT F'RD~F'RFL. E/HF'FM/GR/WHUT INJ~F'RFLE/HPFM INJ,PRFLE/HPFM RI.IN RI IN RI.IN RI. IN RI.IN RIIN RI.IN : 'E'[IN RI IN RIIN RI.IN RI. IN RI.IN RIIN RI.IN RIJN RI.IN RUN RUN RI. IN RUN RI. IN RUN RUN RI.IN RECEIPT OF DATA i 5' 5' 5' · .':5' CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO RAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMCO CAMRO CAMCO CAMCO CAMCO PEGGY BENNETT AT0-t529 TRAMS ~88t APPROVED DISTRIB~ITION CENTRAl_ FILES CHEVRON D & M EXTENSION EXPLORATION EXXON MARATHON MOBIl_ PHIi_.I._IP~ PB WELl.. FTI_E~ R & D STATE OF ALASKA TEXACO ARCO Alaska, In~ Prudhoe Bay Engineering Post Office Box 100360 Anchorage, Alaska 99510-0360 Telephone 907 263 4248 Donald F. Scheve Operations Engineering Manager September 24, 1987 C. V. "Chat" Chatterton Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Re: DS 1-13 Permit No. 77-59 Dear Mr. Chatterton: Attached is the Application for Sundry Approval performed on the above-referenced well. Very truly yours, D. F. Scheve DFS/DAR/jp Attachment cc: Standard Alaska Production Company Pi (DS 1-13)W1-3 detailing work to be RECEIVED WELL S 2 / 23 ARCO Alaska, Inc. is a Subsidiary of AtlanticRichfieldCompany 6.'1S2 C .... STATE OF ALASKA -' AL/-,. A OIL AND GAS CONSERVATION CO. .ISSION APPLICATION FOR SUNDRY APPROVALS 1. Type of Request: Abandon ~ Suspend ~ Operation Shutdown ~ Re-enter suspended well © Alter casing i;i Time extension [] Change approved program [] Plugging [] Stimulate [] Pull tubing [] Amend order F'J Perforate ~ Other 2. Name of Operator 5. Datum elevation (DF or KB) ARCO Alaska~ Inc. 73' RKB feet 3. Address 6. Unit or Property name P.O. Box 100360, Anchorage, AK 99510 Prudhoe Bay Unit 4. Location of well at surface 662' S & 733' E of NW Cr. Sec. 8, T10N, R15E, UM At top of productive interval 1301' N & 1116' W of SE Cr. Sec. 7, TiON, R15E, UM At effective depth At total depth 1006' N & 1375' W of SE Cr. 7. Well number 1-13 8. Permit number 77-59 9. APl number 50-- 029-20270 10. Pool Sec. 7, T10N, R15E, UM Prudhoe Bay Oil Pool 11. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical Casing Conductor Intermediate Production Length 10740 feet 9432 feet 10693 9392 Size 20" 13-3/8" 9-5/8" Plugs (measured) feet feet Junk (measured) Cemented 225 S× AS 5500 Sx PF II 1000 Sx 'G' Measured depth 125' 2725' 10735' Rue Verticaldepth 125' 2724' 9428' Perforation depth: measured 10100-10130'; 10150-10180' true vertical ; 10180-10200' 8883-8909'; 8926-8952'; 8952-8970' ,SE~32 o 10~7 Tubing (size, grade and measured depth) 5½", 17ft, N-80, NPC @ 9646' MD; 4~", 12·6~t, N-80, NP6 @ 9754' l~las~a 0it & 6as 0OHS. 6ommission Anchorafle Packers and SSSV (type and measured depth) B..aker SAB Packer @ 9625' MD; Camco Bal-O SSSV @ 2187' MD 12.Attachments Description summary of proposal ~ Detailed operations program ~ BOP sketch ~ 13. Estimated date for commencing operation November 1987 14. If proposal was verbally approved Name of approver Date approved 15. I hereby,.~certify th.~t t.lqe foregoing is true and correct to the best of my knowledge Signed ~L'/~~~~ Title Operations Engineering Manager Commission Use Only Conditions of approval Approved by Date Notify commission so representative may witness I Approval No. [] Plug integrity ~ BOP Test [] Location clearanceI 7-- ~Z',~' ~ Commissioner by order of the commission Date,,' --"-- ~-~ --'7' % "? '9/ -/¥' 7 Form 10-403 Rev 12-1-85 WELLS/23 D. A. Rich, 263-4351, ATO-1512 Submit in triplicate DS 1-13 SUMMARY OF PROPOSAL ARCO Alaska, Inc. proposes to install a through-tubing bridge plug (TTBP) in DS 1-13 to repair a leaking existing bridge plug installed in 1982 to convert this well from a produced water source well to an oil producer. The new TTBP will be placed immediately above the existing bridge plug. Below is the proposed installation procedure: 1. RU E-line. 2. RIH with vented T.T. bridge plug and CCL. 3. Lightly tag bottom (last PBTD = 10390' MD) and pick up 10'. 4. Set bridge plug with basket at ~10375' MD. POOH. Ref. CNL 12/28/77. 5. RIH with bailer loaded with sand and dump on BP. POOH. 6. RIH with bailer loaded with cement and dump manufacturer's recommended volume of cement on BP. Do not place cement above 10337' MD (HOT). POOH. 7. WOC. 8. RIH with equalizing prong pulling tool and pull equalizing prong. 9. RIH with bailer and dump sufficient cement to cover equalizing port. 10. WOC. 11. RIH with CCL and verify BP placement. Alaska Oil & Gas Cons, DAR/1382 3 1. 5000 PSI 7" WELLHEAD CONNECTOR FLANGE 2. 5000 PSI WIRELINE RAMS (VARIABLE SIZE) ,.5.5000 PSI 4 1/6" LUBRICATOR 4. 5000 PSI 4 1/6" FLOW TUBE PACK-OFF I~ I REL I NE BOP EQU I PMENT [J i Ill 11 I I P.O, Box i(~'~360 Anchorage, ALaska 995:i -0 DATE:: May ~-_(}, i987 Cased /4ole FinaL i .... iS 5 i~5--87 :,R/F t owme +. er /Wa +. er HoLd .... Up Run i 5 Camco 5-:3 5-i3-87 CH CNL Run 4, 5" $ch 5-i2 5--i3-87 I::'Lomme~er Survey Run i, 5" Camco F'l. ea.s'e sign and re~urn l'he ai"~mc:hed COpY a.s receip~ of da'~a. R. ecei red By Ros'anne Peek ATO--t 529 b1:$ rKI ~UT ION F'hi L L i i:).s' R & I) · ~ S o h i (", ~. S~a~e of A Las'l<a J:;..' (".-) C (-.'.? I '..,.' ~..:.' ~,.: .... .:: ................................................................................. ~--J/:'~ ",.."' E /:'~ ~'-.~ iii E: E ~ii:, ~'-":'~ ¥ ~ [;.~ :' (-;-:, J::' ,:.:.? ,.'-:-:.' i.:: /...~-~--(;) .... ,.. ,::: ,.:, ,:::, ~::. ~,/,~, ~ka Oil & Gas Cons. ...... '""' '": Anchorafie "f' i:;: ,':':i ?.,i ;:::.' ......,,. ,:::,"'.. '-;',.. --";::.., "'.',..,.?.:, ~ f:':'J j::, ~:.'-. ¥' .,'.:) ',.....' (-:-:, (:i ..............................................................................................].~ R Iii] F:' Iii] F;,' liiZ N C !iii · A R C 0 C,.':': :i:: e d H c, I. e i .... i :5 i ''~,:.. .... i o,. -::i, ...... 7 F:' D I< .... i ~'::' 0 i ?': ...... .... '::: i 2 ..... i "'": ...... :!ii .... ,' F:'i) I< .... i (') 0 · '", ',' -:" ':" r', I i.-' ....::: ,". B U of. i 0 N ARC:C) AI.a.s'l<a, Inc. F:',O, Box t0(.)360 A'n c h o r' a cj e, A I. a s' I< DATE:' May t9, t986 F;.'. E F E F:.'. E N E: Iii: ' A I:;.'. C 0 M a cj '~'; e t' i c i..,° .... 8 4 -' i 8. - 'Fi 6 Beach iA S..-.S..-.86 R e,.':: e i v e,.':l B'::.." ............................................................... 1..I A V r.!: A N 111C E: '.,:1:, A Y' ! :[ 'r' m a C a 'r' i. i 'n A'i" 0--- i 429 F:' 'i" F;.'. A N S ¢:8629(.) I) t :.:.; T R I B U "[' :t: r)N F:'hi I. I. J l::, z,' F'B We t I. R & D S c, h i ,:::, 5: '!' a 't' e o 'f I exac:o ~AlasKa O~I & Gao Cons. Commission Anchorage D A T' I.-':.] · M a y i 9, 'i 9 iii', (':!, F;..' iii] t::' iii] F;.,' Iii] N C li!] · A F;.'. C 0 M a ::j ;'; e .t: i c i.,j Beacl'; i A ~/ S.---3-.-.86 "f' a t::' e.'.=: w / 1. i -.'i: 't' i 'n,'..:.l i) I ;ii: '1" I:;..' I B U "I" I 0 i".! ARCO Alaska, Inc. Post Office Box 100360 , Anchorage. Alaska 99510 Telephone 907 276 1215 Date: June 26, 1985 Reference: ARCO CH Finals 1-13~Dual Spaced Neutron 5-17-85 Run 1 5" Welex 1-1,7/ Epilog 5-17-85 3-9 / Epilog 5 -15-85 6-14 ~/Dual Spaced Neutron 5-10-85 6- 24/Epilog 5 -18-85 7-26~/~pilog 5-16-85 9-21 ~/Spinner 6-19-85 9-25 ~JSpinner 6-19-85 14-13 ~pinner 6-10-85 15-1J Epilog 5T16-85 16-11/Temperature Log 6-8-85 I 5" DA 1 5" DA I 5" Welex 1 5" DA 1 5" DA 1 5" Camco I 5" Camco I 5" Camco 1 5" DA i 5" Camco ~SigI as Received by Pam Lambert ATO 1429C Trans 180 receipt of data. Alaska. Oit ~, (~;u~ (;u~]s, Commissiorl Al~chorage D&M ][xpl::~-Servi. ces ~- Ext. Explorer:ion-. NaraChon Arichorage. AlasKa 99510 Telephone 907 June 10, 1983 Reference: Arco Pressure Data D.S. 1-13J 5-30-83 Static Survey Camco D.S. 1-18t 5-30-83 Static Survey Camco D.S. 6-18/ 5-11-83 Static Survey Camco D.S. 6-23 r 5-1-83 Static Survey DA D.S. 7-2/ 4-9-83 Pressure Build-up Ca~co 4-9-83 Pressure Build-up Data Sheet D.S. t2-11¢''' 5-30-83 Static Survey Camco D.S. 14-29 4-2-83 Pressure Build-up Camco 4-2-83 Pressure Build-up Data Sheet D.S. 14-30¢' 4-1-83 Pressure Build-up Camco 4-1-83 Pressure Build-up Data Sheet D.S. 17-5 ~ 5-19-83 Static Survey Camco D.S. 17-9/ 5-18-83 Static Survey GO Please sign and return the attached copy as receipt of data. Kelly McFarland ATO-1429D Trans. # 381 DISTRIBUTION NORTH GEOLOGY DRILLING .SOHIO ~ MARATHON ~ .'~..;.?~-;;~.:: ::~:.: ...... · D .& M DALLAS .: CHEVRON CAROLINE SMITH ARCO Ala~'~ka, Inc. Po.~ Office ~ '7,:'~(~ Telephone 907 277 5637 January 17, 1983 Reference: Arco Pressure Data D.S. 1-13 12-4-82 D.S. 13-6 10-16-82 Pressure Build-up Otis Pulse Test Survey (Final Copy) DA Please sign and return the attached copy as receipt of data. Kelly McFarland AFA-403 Trans. # 050 DISTRIBUTION NORTH GEOLOGY R & D DRILLING PHILLIPS SOHIO MARATHON CHEVRON EXXON MOBILE GETTY STATE OF DALLAS ARCO Alaska, Inc. Post Office Box 360 Anchorage, Alaska 99510 Telephone 907 277 5637 July 13, 1982 Mr. C. V. Chat Chatterton Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Dear Mr. Chatterton: RE: D.S. 1-13 Permit Noo 77-59 D.S. 1-18 Permit No. 78-29 D.S. 7-7 Permit No. 78-15 Enclosed are Subsequent Sundry Reports detailing work done on the above-mentioned wells. Very truly yours, D. F. Scheve Regional Eng±neer DFS:TKKW Enclosures Distribution: Sohio Petroleum Co. STATE OF ALASKA ALASKA ~,,L AND GAS CONSERVATION COMMISSION SUNDRY NOTICES AND REPORTS ON WELLS 1. DRILLING WELL [] COMPLETED WELL [] 2. Name of Operator 7. Permit No. ARCO Alaska, Inc. 77-59 3. Address 8. APl Number P.O. Box 360 Anchorage, Alaska 99510 50- 029-20270 OTHER [] 4. Location of Well 662'S & 733'E of NW cr Sec 8, T10N, R15E, UM (surface) 1006'N & 1375'W of SE cr Sec 7, T10N, R15E, UM (TD) 5. Elevation in feet (indicate KB, DF, etc.) 73' RKB 6. Lease Designation and Serial No. ADL 28329 9. Unit or Lease Name Prudhoe Bay Unit 10. Well Number D.S. 1-13 11. Field and Pool Prudhoe Bay Field Prudhoe Oil Pool 12. Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF: (Submit in Triplicate) (Submit in Duplicate) Perforate [] Alter Casing [] Perforations [] Altering Casing [] Stimulate [] Abandon [] Stimulation [] Abandonment [] Repair Well [] Change Plans [] Repairs Made [] Other [] [] Other [] Pulling Tubing [] Pull Tubing (Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.) 13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any proposed work, for Abandonment see 20 AAC 25.105-170). Began operations 5-1-82 on D.S. 1-13 to convert from water source well to oil producer. Set bridge plug at 10441'MD. Cement to 10397'MD. PBTD at 10397'MD. RIH with gun and perforated 10100'-10130'MD. Flow well to check water cut. Returns indicate no water. RU slickline and replace gas lift valves with dummies. Resume operations to perforate remaining interval began 6-23-82.- Perforated 10150' - 10200'MD. R CEIVED A!aska 0il & Gas CoDs. 6oinmissiorl Anchorage 14. I hereby certify that the foregoing is true and correct to the best of my knowledge. The space below for Commission use Date Conditions of Approval, if any: By Order of Approved by. COMMISSIONER the Commission Date Form 10-403 Rev. 7-1-80 Submit "Intentions" in Triplicate and "Subsequent Reports" in Duplicate ARCO Alaska, Inc. Post Office Box ~60 Anchorage, Alaska 99510 Telephone 907 277 5637 June 30, 1982 Mr. C. V. Chat Chatterton State of Alaska Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501 Dear Mr. Chatterton' Subject- D.S. 1-13 Permit No. 77-59 Enclosed is the Completion Report for work done on the above mentioned well. Very truly yours, Regional Operations Engineer DFS · TKKW :ml c Enclosures Di stri buti on: Sohio Petroleum Co. Oil & Gas Cons. ' '~" STATE OF ALASKA - ALASKA .... ~ AND GAS CONSERVATION CC MISSION WELL COM LF. TION OR RF. COMI LETION REI ORT AND LOG 1. Status of Well Classification of Service Well OIL [] GAS [] SUSPENDED [] ABANDONED [] SERVICE [] 2. Name of Operator 7. Permit Number ARCO Alaska, Inc. 77-59 3. Address 8. APl Number P.O. Box 360 Anchorage, AK 99510 50_029-20270 4. Location of well at surface 9. Unit or Lease Name 662'S & 733'E of NW cr Sec. 8, T10N, R15E, UM Prudhoe Bay Unit At Top Producing Interval 10. Well Number 1301'N & !l16'W of SE cr Sec 7, TiON, R15E, UM D.S. 1-13 At Total Depth 11. Field and Pool 1006'N & 1375'W of SE cr Sec 7, TiON, R15E, UM Prudhoe Bay Field 5. EleVation in feet (indicate KB, DF, etc.) I 6. Lease Designation and Serial No. Prudhoe Oil Pool 73' RKBI ADL 28329 12. Date Spudded 13. Date T.D. Reached 14. Date Comp., Susp. or Aband. I 15. Water Depth, if offshore 16. No. of Completions 12/5/77 12/23/77 1/2/78I ---- feet MSL Single 17. Total Depth (MD+TVD) 18.Plug Back Depth (MD+TVD) 19. Directional Survey 20. Depth where SSSV set I 21. Thickness of Permafrost /0,740'MD 9432'TVD 10,693'MD 9392'TVDYES [] NO [] feet MD I 22. Type Electric or Other Logs Run DIL/SP, BHC/Sonic/GR, CNL,FDC/CAL/GR, CNL/GR/CCL 23. CASING, LINER ANOCEMENTING RECORD SETTING DEPTH MD CASING SiZE WT. PER FT. GRADE TOP BOTTOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED 20" 94#Welde~l H-40 Surf 125' 30" 225sx Arcticset Cmt 13-3/8" 72# Butt N-80 2725' 17-1/2" 5500sx Permafrost II 9-5/8" 47# Butt N-80 & 10,735' 12-1/4" 1000sx Class G J&L-95 24. Perforations open to Production (MD+TVD of Top and Bottom and 25. TUBING RECORD interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD) 5-1/2" 9754' 9633' i0,180'-10200'MD 20' 4spf 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. 8952'-8970' TVD DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED 27. PRODUCTION TEST Date First Production I Method of Operation (Flowing, gas lift, etc.) 5-17-82I :Flowing _. Date of Test Hours Tested PRODUCTION FOR OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE GAS-OIL RATIO 6-3-82 12.4 TEST PERIOD II~ 2824 1326 0 71 687 Flow Tubing Casing Pressure CALCULATED~. OIL-BBL GAS-MCF WATER-BBL OILGRAVITY-API (corr) Press. 742 1450 24-HOUR RATE II~ 4947 3397 0 27.0 28. CORE DATA Brief description of tithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips. Form 10-407 /~ ~.~ dUp Icate Rev. 7-1-80 CONTINUED ON REVERSE SIDE NAME T. Sadlerochit B. Sadlerochit 30. GEOLOGIC MARKERS MEAS. DEPTH TRUE VERT. DEPTH 9975' 8775' 10636' 9343' FORMATION TESTS Include interval tested, pressure data, all fluids recovered and gravity, GOR,and time of each phase. 31. LIST OF ATTACHMENTS 32. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed Title Regional Engineer Date INSTRUCTIONS General' This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Item 1' Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and 24' If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). Item 23' Attached supplemental records for this well should show the details of any multiple stage cement- ing and the location of the cementing tool. Item 27' Method of Operation' Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In jection, Gas Injection, Shut-in, Other-explain. Item 28: If no cores taken, indicate "none". Post Office Box 360 Anchorage. Al~-~ka 99510 Telephone 90 '7 5637 July 23, 1982 Reference: ARCO CASED HOLE FINAL LOGS D.S.12-9 7/6/82 DOS.13-21 5/31/82 D.S.15-11 6/28/82 DOS.15-14 6/27/82 D.S.1-13 7/5/82 -D.S.1-9 6/3/82 Spinner Run 1 5" CNL Run 1 5" Collar & Perf Log Run 1 5" Collar & Perf Log Run 1 5" Collar & Perf Log Run 1 5" EPL Run 1 5" Please sign and return the attached copy as receipt of data. Mary F. Kellis North Engineering Transmittal # 301 DISTRIBUTION NORTH GEOLOGY EXXON R&D MOBIL DRILLING GETTY PHILLIPS D&M SOHIO GEOLOGY MARATHON STATE OF ALASKA CHEVRON Anchorage, Alaska 99510 Tele"~'one June 9, 1982 Reference: ARCO CASED HOLE FINALS D.S.15-3 3/20/82 CNL/GR Run 1 5" D.Sol-13 5/17/82 Collar & Perf Log Run 1 5" D.S.15-4 4/8/82 CCL Run 2 5" P1 - ease sign and return the attached copy as receipt of data. Mary F. Kellis North Engineering Transmittal # 217 DISTRIBUTION NORTH GEOLOGY EXXON R&D MOBIL DRILLING GETTY PHILLIPS D&M SOHIO' GEOLOGY MARATHON CHEVRON ARCO Alaska, Inc. is a subsidiary of AllantlcRIchfieldCompany ARCO Oil and Gas npany North Alaska Oistrict Post Office Box 360 Anchorage, Alaska 99510 Telephone 907 277 5637 Jerry A. Rochon District Operations Engineer Aug 10, 1981 Reference: ARCO Cased Hole Final D.S.I-13 6/3/81 Temperature Log Run 1 5" ~~Please sign and return the attached copy as receipt of data. Mary F.Kellis North Engineering Transmittal #501 DISTRIBUTION NORTH GEOLOGY R&D DRILLING ENG. MANAGER D&M GEOLOGY STATE OF ALASKA ARCO Oil and Gas Company is a Division o~ AttanticRichlieldCompany EXXON MOBIL GETTY PHILLIPS SOHIO MARATHO}ff _~ _ _ ' EC£1VED Alaska Oil & Gas Cons. CommissMn Anchorage Oil and Gas' '~pany North Alaska District Post Office Box 360 Anchorage, Alaska 99510 Telephone 907 277 5637 Jerry A. Rochon District Operations Engineer Aug 7, 1981 Reference:ARCO Cased Hole Final Prints ~~ 7/10181 D.S.3-7 -///' 7/8/81 /' D.s.~-7 7/8/81 DoSo5-3 .,2? 7/27/81 D.S.14-20~/ 7/3/81 D.S.16-3 ~?'' 7/12/81 D.S.16-gti" 7/22/81 D.S.16-14 ~ 7/10/81 D.S.16-&4V 7/7/81 D.S.17-6 ,' 6-11/28-81 D.S.17-8 ~:' 7/6/81 CNL Run 3 5" EPL Run 1 5" TDT RUn 1 5" CNL Run 3 5" C~NL/GR Run 1 2/5" CCL & Perf Record Run 1 5" · CCL & Perf Record 'Run 1 5" CNL/GR Run 1 2"/5" ACBL/VDL Run 1 5" Diff Temp Log Run 1,2 5" CNL/GR Run 1 2"/5" se sign and return the attached copy as receipt of data. Mary F. Kellis North Engineering Transmittal #489 DISTRIBUTION NORTH GEOLOGY R&D DRILLING ENG. MANAGER D&M GEOLOGY STATE OF ALASKA EXXON MOBIL 6ETTY MARATHON CHEVRON ARCO Oil and Gas Ccmpany is a Division ol AtlanticRichlieldCompany Pos! Ollice Bo× :360 Anchorage, Alaska 99510 Telephone 907 277 5637 Jerry A. Rochon Dislri¢! Operations Engineer July 31, 1981 Reference: ARCO Pressure Data ,~)~S.l-13 ~-6/3/Sl D.S.i-18 7/I/81 D.$.5-i4 3/21/81 Pressure Survey Pressure Survey pressrue Survey '~tPtease sign and return the attached copy as receipt of data. Mary F. Kellis North Engineering Transmittal #476 DISTRIBUTION NORTH GEOLOGY R&D DRILLING ENG. MANAGER D&M GEOLOGY STATE OF ALASKA GETTY PHILLIPS SOHIO MARATHON CHEVRON ARCO Oil and Gas Company is a Diwsion of AllanlicRichlielclCompany ARCO Oil and Gas ,.C..ompany North Alas~" ',islrict Post Otlice box 360 Anchorage. Alaska 99510 Telephone 907 277 5637 Jerry A. Rochon District Operations Engineer July 21, 1981. ~J ~ f .'.~AJ~JD__~~c Tapes & Listings ~__~.~~ 12-2 ,j~F'/5/81 Tape ¢/61764 Schlumberger ~~-~' 6/26j"81 TaPe #61763 " .~.~D':~: 7/7/81 Tape (/62003 " ~D.S.12-9~ 6/11/81 Tape #61640 " '"~Please sign and return the attached copy as receipt of data. Mary F. Kellis North Engineering Transmittal #446 DISTRIBUTION NORTH GEOLOGY R&D DRILLING ENG. MANAGER D&M GEOLOGY STATE OF ALA$KA A~CO Od nnd C~s Cot~l~ny ~ .~ Diws~on o! AIl~F~llc~JChJ~ffldCompc~n~/ EXXON MOB t L GETTY PHILLIPS SOHIO .... - ,,.~.,, CHEVRON j....!.-, I~:!~, (' '~ ;.., ,... ~,.,,;,-,j,~..][~,j, ,. .. ., ARCO Oil 3nd 'February 8, 1980 Reference: Enclosed are Pressure Surveys for the following ARCO wells: 9/20-23/79 Camco 8/11-1Z/79 " D.S. S-6 8/13-14/79 Camco D.S. 5-12 12/6-7/79 Gearhart-(~ven D.S. 5-17 6/27-7/1/79 Schlt~mberger D.S. 5-17 9/26-28/79 Camco' D.S. 5-17 12/14-16/79 Dresser Atlas ~/~lease sign and return the attached copy as receipt of data. .. K. J. Sahlstrom North Engineering TRANSSiI TTAL # 0 7 9 Dt STR'[ ~. TT [ ON North Alaska Distric~ Post O,'¢ica '~-*" 380 Anchora2a .... zska 99510 Telepho.qa -907 277 563F October 15, 1979 Reference' ~nclosed are Cased Hole Logs for the following ARCO wells' p.s. 2-zz 9/25/79 " s"' D,S, 5-6 5/19/79 " 5"' ~.s.s-17 9/25/79 " D,S. 7-1 7/5/79 " 5" D.S. 12-5 9/25/79 6NL WGI-3 9/26/79 " 2 & 5" e sign and return the attached copy as receipt ~of data. K, J, Sahlstr°m North Engineering TP~NSMITTAL # 398 I. L. l [,,[t.,f. Lt ,.,,_.olo~) }.lxxon Dri 11 ing ~Xlob i 1 Eng. ~X~anager (iettv Ceo ~ogy Marathon S~ate of Alaska i~h, illips D & ~I Chevron ARCO Oil and Gas ,mpany Alaska Regio~ Post Office Box 360 Anchorage, Alaska 99510 Telephone 907 277 5637 August 23, 1979 Mr. Hoyle Hamilton State of Alaska Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 9950] Subject: ¢*DS~-I 3~ DS 4-15 DS 7-7 DS 7-8 ~ /ermi t No. Permit No. Permit No. Permit No. !Permit No. DS 7-9 ~ Permit No. DS 7-10' ~ermit No. DS 13-1!?ermit No. DS 13 3yermit No. DS 14-4 ~bermit No. DS 14-54Permit No. . , CO~FER: ¢ 78-29 78- 37 78-15 78-16 78- 76 78-77 78-60 78-62 78-53 78-64 ....... Dear Si r: Enclosed please find a Completion Report reporting production information for the above-mentioned wells. Very truly yours, P. A. VanDusen District Drilling Engineer PAV-cs Attachments , ARCO Oil and Gas Compa'ny is a Division ot AtlanticRichfieldComL:~m.v Form P--7 SUBMIT IN DUPL~ ~ I-E* STATE OF ALASKA (See other In- structions on reverse side) OIL AND GAS CONSERVATION COMMITTEE WELL COMPLETION OR RECOMPLETION REPORT AND LOG* la. TYPE OF WELL: QwIELLL [~] GASwELLi ir--] DRYr"~ Other Wa ter Source b. TYPE OF COMPLETION: NEW WORK F'--] DEEP- PLUG [---I DIFF. Perforated WELL[--] OVER I I EN E~] BACKI I RESER.E~] Other 5. APl NUMERICAL CODE 50-029-20270 6. LEASE DESIGNATION AND SERIAL NO. ADL 28329 7. IF INDIAN, ALLOTTEE OR TRIBE NAME 8. UNIT, FARM OR LEASE NAME 2. NAME OF OPERATOR Atlantic Richfield Company 3. ADDRESS OF OPERATOR P.O. Box 360 Anchorage, Alaska 99510 4. LOCATION OF WELL (Report location clearly and in accordance with any State requirements)* At surface 662'S & 733'E of NW cr Sec 8, T10N, R15E, UM At topprod, interval reported below 1301'N & ll16'W of SE cr Sec 7, T10N, R15E, UM At total depth 1006'n & 1375'W of SE cr Sec 7, T10N, R15E, UM ¸9. Prudhoe Bay Unit WELL NO. DS 1-13 (44-7-10-15) 10.~IELD, ~AND PO,,OL, OPi~/~I LI~C~AT vruanoe ~av rleja Prudhoe 0il Pool il. SEC., T., R., M., (BOTTOM HOLE OBJECTIVE) Sec 7, T10N, R15E, UM 12. PERMIT NO. 77-59 12/5/77 I 12/23/77AC~I l/2/78 IpL 18. TOTAL DEPTH MD&TVD I19. PLUG B MD&T~/DI:~O. IF MULTIPLECOM ., , ' , / DEPTH ~ HOW MANY* 10,740 MD 9432 TVD /10'693'MD 9392'TVDI Single 22. PRODUCING INTERVAL(S), OF THIS COMPLETION --TOP, BOTTOM, NAME (MD & TVD)* Top Sadlerochit 9975' MD 8775'TVD Base Sadlerochit 10636'MD 9343'TVD ELEVATIONS (DF, RKB, RT, GR, ETC)* 117. ELEV. CASINGHEAD 73' RKB 21. ROTARY TOOLS All INTERVALS DHILLED BY CABLE TOOLS 23. WAS DIRECTIONAL SURVEY MADE Yes 24. TYPE ELECTRIC AND OTHER LOGS RUN ~/ DIL/SP, BHC/Sonic/GR, CNL/FDC/CAL/GR, CNL/GR/CCL 25. CASING SIZE ] WEIGHT, LB/FT. I GRADE I DEPTH SET (MD) 20" 94# Weldedl H-40 I 125' 13-3/8" 172# Butt I N-B0 I 2725' 9-5/8" 47# Butt IN-80& 10,735' Id&L-95 26. LINER RECORD SIZE TOP (MD) BOTTOM (MD) SACKS CEMENT* CASING RECORD (Report all strings set in well) HOLE SIZE I CEMENTING RECORD ' / 30" 1225 sx Arcticset Cmt 5500 sx Permafrost II cm 17'-'1/2"12-1/4" 1000 sx Class G cmt AMOUNT PULLED TUBING RECORD [2~ SIZE -1/2" 28. PERFORATIONS OPEN TO PRODUCTION (Interval, size and number) .10,629'-10,609' :210,515'-10,498' ~!,10,591 '-10,571" ~ (!0,468'- 0,448' ~i 10,557'-10,539' w/4 shots per foot .~ ~ i~'7~ :~10,537'-10,529' q~, 30. DATE FIRST PRODUCTION 4/24/79 5/15/79 I 3.0 I 95/64 TEST PER,OD FLOWTUBING CASING PRESSURE ICALCULATED OIL--BBL. PRESS'Il60 Ps~gI 2600 psig o 31. DISPOSITION OF GAS (Sold, used for fuel, vented, etc:) Reinjected SCREEN (MD) DEPTH SET (MD) PACKER SET (MD) 9754' 9633' 29. ACID, SHOT, FRACTURE, CEMENT SQUEEZE, ETC. DEPTH INTERVAL (MD) 32. LIST OF ATTACHMENTS N/A PRODUCTION t.~ :. IPRODUCTION METHOD (Flowing, gas lift, pumping--size and type of pump) . . Gas Lift OIL--BBL. GAS--MCF. GAS-MCF. I 41 26 AMOUNT AND KIND OF MATERIAL USED : l WELL STATUS (Producing or i [ shut-in) WATER--BBL, 516 I 756 125 SgF/BW(forma~lon WATER-BBL. I OIL GRAVITY-APl (CORR.) gas ) I 6049 ~ -- I TEST WITNESSED BY 33. I hereby certify that the~,regoing and~attached information is co~nplete and correct as determined from all available records. SIGNED ~ ~/~~~"~- TITLE District Drilling Engineer *(See instructions and Spaces for Additional Data on Reverse Side) DATE 8/23/79 INSTRUCTIONS General' This form is designed for submitting a complete and correct well completion r. eport and log on all types of lands and leases in Alaska. Item: 16: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Items 20, and 22: If this well is completed for separate production from more than one interval zone (multiple com- pletion), so state in item 20, and in item 22 show the producing interval, or intervals, top(s), bottom(s) and name(s) (if any) for only the interval reported in item 30. Submit a separate report (page) on this form, adequately identified, for each additional interval to be separately produced, showing the additional data pertinent to such interval. Item 26: "Sacks Cement"' Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. Item 28' Submit a separate completion report on this form for each interval to be separately produced. (See instruction for items 20 and 22 above). 34. SUMMARY OF FORMATION TESTS INCLUDING INTERVAL TESTED, PRESSURE DATA AND RECOVERIES OF OIL, GAS, WATER AND MUD 35. GEOLOGIC MARKERS ,, NAME MEAs. DEPTH , T.RUE' vE'RTi DEPT None Top Sad] erochit 9975' 8775' Base Sadlerochit 10,636' 9343' 36. CORE DATA, ATTACH BRIEF' DESCRIPTIONS OF LITHOLOGY, POROSITY, FRACTURES, APPARENT DIPS AND DETECTED SHOWS OF OIL, GAS OR WATER. None ; ,, North American Prodt~cing Division North Atas~District Post Of~ic ax 350 Anchor'sge, Alaska 995'!0 Telephone 907 277 5637 July 13, 1979 Reference: Enclosed are final p~nts for the following ARCO cased-hole well§: · ~ - ' ...... '1 ' - ~ --'' '~'~~' -~'_ D.S-.-~-~!~..,_.i~'_.~[d~a~l Spac,ing ~e~al Neutron Decay~ T~e 1/23/.7~_ "'5" " h.' h%~- lO ~asing Collar Lo - ~'J 2 1 79 5" ..... D;S-.-I4-4 :~ompensated Neutron . ' 1/20/79 D.S. 14-5 ~coustlc Cement Bond Log ~L 2/20/79 D.S. 14-2 ~?erforation Collar Log 3/9/79 D.S. 1-.18 ~ Tie In Log For ~wer Baker Pa:kef 5/2/78 S" Run 1 D..S. :-8 ~luid Density 2/~/79 ~" R~ 1 D.S.:-5-8 ':--$p~er Flo~neter . 1-19/2~-79 - ~,,., ~j~l ~ ~ / ~ ~ Please sign and return the attached copy as receipt of data. o Very truly yours, R. A. Bellinger TRANSMITTAL # 215 DISI RIB[II ION North Geology Drilting Eng. Manager R&D Geology State of Alaska Mobil Get-ty Sohio Marathon Phillips Chevron f'.!ortt~ Ah:ska ~Zs-'.rici Pcs~ Office ~ :3~¢ Anch~ra,',% Ai'4$ka .0951'3 'relophcne 907 277,5037 April 5, 1979 Reference' Enclosed are the following magnetic tapes. s/pS 5£i0 2/20/79 #55172 TDT ~S ~4_~2 10121]78 #54211 0rt 10/22/78 #54567 OH · ! Please sign and return the copy as receipt of'data~~~ ¥/f~7~ Sincerely, V.G. Reimers North Engineering TK&..N~IITFAL # 147 DISTRIBUTION North Geologqr Drilling Eng. Manager R & D Geology State of'Alaska D & B! ~xxon Mobil Getty Sohio Marathon Phillips Chevron ' Ai:i~nticRich fieldCompany North American Producing Division Alaska Reg.~ Post Office x 360 Anchorage, A~aska 99510 Telephone 907 277 5637 October 12, 1978 Reference: Enclosed are the following Directional Surveys: ~' ::Singleshot 12/30/77 O.~. #1-12 Singleshot 11/30/77 Please sign amd return the copy as receipt of data. Sincerely, V.G. Reimers North Engineering TRANSMITTAL #512 AtlanticRichfieldCompany North Am~ ~n Producin!: Divisi,3,q Alaska Re ~ Post Office Box 360 Anchorage, Alaska 99510 Telephone 907 277 5~37 August 29, 1978 HKVP Mr. Hoyle Hamilton State of Alaska Department of Natural Resources Division of Oil and Gas 3001 Porcupine Drive Anchorage, Alaska 99501 In compliance to your request for data regarding reservoir surveillance, enclosed are copies of all initial surveys and pressure time data plus rate data per your letter of August 22, 1978. Rate Data is as follows' ~IELL TEST DATE CUMMULATIVE/BBLS RATE PER DAY 4-8 11/2/77 513,812 9666 5-3 01/13/78 1,244,283 8325 9-1 11/14/77 884,392 12500 9-3 11/24/77 1,066,628 10200 9-10 12/13/77 536,509 5072 9-12 12/21/77 436,223 6630 ~-.1:13. i 04/27/78 Water Well 9-3 05/4/78 478,967 8660 If any other information is needed, please do not hesitate to make the request. Very truly yours, .-. /-' -~"-~ ,/~' .,' .- ,: ..i;.. // ,'~ f .':/'-' ~:%2.>¢_i ---- · .-'O. ~A. 'RochOn · - ./ JAR/RAL/er }:1'o111 ' J. A. Rocho}i/V. G. Reimers____ herewith are the following for the. subject well' No. Acid or Fracture Treatment Log - BIIP Buildup [ Flow Profile Survey Borehole Ge6met~~ Log Carbon Oxygen Log ~ C~sing Collar Log _~. .... Ccmer, t BoncI Log ~ ' Compensated Neutron LOg - Cased Hole Core/analysis - Interval Core No. Core Description (~xlC) - Interval Core Description (Cony.) - Cpre No. Directional Surv.~y- Gyro · - SSngle Shot - ~k~ltishot ' · Engineering Producti. on' Log Dluid Analysis . · }:luid Density Gamma' Ray Location Plat Monthly Well Tekt Data Nud Log ,,. Perforating Record. State Reservoir Pressure Report Surveillance Reports .... ~femperature Log k/ Transient Pressure Surveys TVD Logs - lk~el Induction Laterolog - Compensated Formation Density Log - Compensated Neutron-Fmxnation Density Log - Boreho].c Compensated Sonic Log - I)orosity I.og Scal~ :c. ceipt Acknowledged Xerox Sep-:ia 'BL' Line Date' ,'l.c;asc· lk-'.ttu'n Receipt To' Ms. V. G. Reimers Atlantic Riclff.'ield Company P. O. Box 360 Anchorage, Alaska 99510 '~.~anticRich,~ield C°mpany North Americ~.~. Producing Division Norlh Alaska trict Post Office ~lo× 380 Anchorage, Aiaska 99510 !?-~.~.Telophone 907 277 5S37 J~e 29, 1978 Enclosed are prints of the following Ope~oe Logs: '', DIL 2" BCS 2" D.S. #2-11 DIL 2" D.S. #4-12 DIL 2" BCS 2" D.S. #5-7 5" D.S. #5-12 DIL 2" D.S. #5-13 DIL 2" D.S. #9-19 DIL 2" BCS 2" D.S. #9-20 DIL 2" Please sign and return attached copy of transmittal as receipt of data. Very truly yours, · North Operations ~ngineering Transmittal #833 ' :lan~icHiol~:~eld uon~pany North Alaska.:;~istrict Post O~tice Anchorage, A,aska 99,510 Telephone -3-07 277 5,337 29, 1978 Enclosed are copies of of the follow, lng Cased hole logs' Ganm~a-Ray Neutron Log D.S. #5-2 5" (1 Dresser Atlas- 1 Go Wireline) Compensated Neutron Log D.S. #4-15 2" & 5" Cement Bond Log D.S, #4-1 2" & 5" Neutron Log D.S. #1-4 5" Casing Collar Log & Perforating Record D.S. ill-13 7 5" Continuous Flow Survey --D.S. fl5-8 5" D.S. #1-4 5" Please sign and return copy of transmittal as receipt of data. Very truly yours, North Operations Engineering Transmittal tt373 ~ AtlanficRiChfieidCompany · North AmeriteCh Producing Division North Alask ~trict Post Office Box 360 Anchorage, Alaska 99510 Telephone 907 277 5637 May 10, 1978 Mr. Hoyle H. Hamilton State of Alaska Department of Natural Resources Division of Oil and Gas 3001 Porcupine Drive Anchorage, Alaska 99501 Subject' DS 1-13 Permit No. 77-59 Dear Sir' Enclosed please find our Sundry Notice of Subsequent Report detailing the work done on the above-mentioned well. Very truly yours, Frank M. Brown District Drilling Engineer /am Enclosure Form 10-403 REV. 1-10~73 Submit "1 ntentions" in Triplicate & "Subsequent Reports" in Duplicate STATE OF ALASKA OIL AND GAS CONSERVATION COMMITTEE SUNDRY NOTICES AND REPORTS ON WELLS (Do not use this form for proposals to drill or to deepen Use "APPLICATION FOR PERMIT--" for such proposals.) WELLI.--.I OTHER Water Source Well 2. NAME OF OPERATOR Atlantic Richfield Company 5. APl NUMERICAL CODE 50-029-20270 6. LEASE DESIGNATION ANO SERIAL NO. ADL 28329 7. IF INDIAN, ALLOTTEE OR TRIBE NAME 8. UNIT, FARM OR LEASE NAME Prudhoe Bay Unit 3. ADDRESS OF OPERATOR 9. WELL NO. P.O. Box 360; Anchorage, AK 99510 DS 1-13 4. LOCATION OF WELL At surface 662' & 733'E of NW cr.Sec. 8, TION, R15E, UM 13. ELEVATIONS (Show whether DF, RT, GR, etc.) 39,7' pad elevation 14, Check Appropriate Box To Indicate Nature of Notice, Re 10. FIELD AND.~OOLeP. R ~VI~.DCAT Prudhoe pay rle~a Prurlhn~ (lil Pnnl 11. SEC., T., R., M., (BOTTOM HOLE OBJECTIVE) Sec. 7, TION, R15E, UM 12. PERMIT NO. 77-59 )ort, or Other Data NOTICE OF INTENTION TO: TEST WATER SHUT-OFF FRACTURE TREAT SHOOT OR ACIDIZE REPAIR WELL (Other) PULL OR ALTER CASING MULTIPLE COMPLETE ABANDON* CHANGE PLANS SUBSEQUENT REPORT OF: WATER SHUT-OFF ~ FRACTURE TREATMENT ~ SHOOTING OR ACIDIZING L.~ (Other) Perforate Wa~er REPAIRING WELL ALTERING CASING ABANDONMENT* Zone (NOTE: Report results of multiple completion on Well Completion or Recompletion Report and Log form.) 15. DESCRIBE PROPOSED OR COMPLETED OPERATIONS (Clearly state all pertinent aetells, and give pertinent dates, Including estimated date of starting any proposed work. Rigged up to perforate 4/21/78. Pulled dummy valve. Circulated diesel. Set dummy gas lift valve in mandrel. Perforated intervals from 10,629'-10,609', 10,609'-10,591', 10,591'-10,571', 10,557'-10,539', 10,537'-10,529', 10,515'-10,498', 10,488'-10,468', 10,468'-10,448'. Flowed and tested well. Ran flapper valve. Installed and tested tree cap. Suspended well on 5/2/78. 16. I hereby certify that the foregoing is true and correct District Drilling Engineer DATE May 10, 1978 (This space for State office use) APPROVED BY CONDITIONS OF APPROVAL, IF ANY: TITLE DATE See Instructions On Reverse Side AflantiCRichfieldCornpany North Amer~.~m Producing Division North Alasl ~trict Post Office Box 360 Anchorage, Alaska 99510 Telephone 907 277 5637 April 17, 1978 Mr. Hoyle H. Hamilton State of Alaska Department of Natural Resources Division of Oil and Gas 3001 Porcupine Drive Anchorage, Alaska 99501 Subject: DS 1-13 Permit No. 77-59 Dear Sir' Enclosed please find a Sundry Notice outlining for the above-mentioned well. Very truly yours, Frank M. Brown District Drilling Engineer /am Enclosure our changes Form 10-403 REV.~ 1-10-~3 Submit "Intentions" in Triplicate & "Subsequent Reports" in Duplicate STATE OF ALASKA OIL AND GAS CONSERVATION COMMITTEE SUNDRY NOTICES AND REPORTS ON WELLS' (Do not use this form for proposals to drill or to deepen Use "APPLICATION FOR PERMIT--~' for such !--! [-] WELLU WELL OTHER' Water Source Well 2. NAME OF OPERATOR Atlantic Richfield Company ,,, ADDRESS OF OPERATOR P.O. Box 360, Anchorage, Al<, 99510 ,, . 4. LOCATION OF WELL · At surface 662'S & 733' E of NW cr Sec 8, TI0N, Rl5E, UM At TD: 1006'N & 1375'W of SE cr Sec 7, Tl0N, Rl5E, UM 13, ELEVATIONS (Show whether DF, RT, GF~, etc.) 39.7' pad elevation ~he6k Appropriate Box To Indicate Nature of Notice, Re 5. APl NUMERICAL CODE 50-029-20270 6. LEASE DESIGNATION AND SERIAL NO. ADL-28329 7. IF INDIAN, ALLOTTEE OR TRIBE NAME 8. UNIT, FARM OR LEASE NAME Prudhoe Bay Unit WELL NO. DS 1-13 10. FIELD AND POOL, OR WILDCAT Prudhoe Bay Field, Prudhoe 0il Poe~- 11. SEC., T., R., M., (BOTTOM HOLE OBJECTIVE) Sec 7, T10N, R15E, UM 12. PER~IT NO. 77-59 3ort, or Other Data NOTICE OF INTENTION TO: PULL OR ALTER CASING MULTIPLE COMPLETE ABANDON* CHANGE PLANS TEST WATER SHUT-OFF FRACTURE TREAT SHOOT OR ACIDIZE REPAIR WELL (Other) SUBSEQUENT REPORT OF: WATER SHUT-OFF ~ REPAIRING WELL FRACTURE TREATMENT ALTERING CASING SHOOTING OR ACIDIZlNG ABANDONMENT* (Other) (NOTE: Report results of multiple completion on Well Completion or Recompletion Report and Log form.) 15. DESCRIBE PROPOSED OR COMPLETED OPERATIONS (Clearly state all'pertlnent'cletalls, and give pertinent dates, including estimated date of starting any proposed work. Atlantic Richfield proposes to perforate this well in the water zone of the Sadlerochit formation. A short flow test will be performed. The well will later be put on water production for a longer period of time. Subsequent Work BeDorted on Form No./~-~ Dated ~'/~.~ ' 16.SIGNED ~//~~/~'///~'1 hereby certify that the~lng~~./,~,~,jls true and correct .... T ITLEDistrict Drilli~.g Enginee~r DATE. (This space for State office u~,e) CONDITIONS (~ A~P-F~VAL, IF ANY: See Instructions On Reverse Side North Alaska l)istrJ.ct E!~i4ine( T RAN S~,,I I T TA L To: Fro;n: J. A. Rochon/R. A. Logue Date' Transmitted herewith are the following for the subject well' '~/~~ F~/~/~ Run No. Scale' Xerox Sepia Acid or Fracture Treatment Log - BHP Buildup & Flow Profile Surrey Borehote Geometry Log Carbon Oxygen Log casing Collar Log _ ~ Cement Bond Log '~ Compensated Neutron Log - Cased Hole Core Analysis - Inte~aml Core No. Core Description (~IC) - Inte~a;al Core Description (Cony.) - Core No. Directional Survey- Gyro - Single Shot - ~$ultishot 'Engineering Production' Log __ ~luid Analysis .Fluid D~nsity Gamma'Ray Location Plat Monthly Well Test Data Mud Log Perforating Record · State Reservoir Pressure Report Surveillance Reports Temperature Log Transient Pressure Surveys 'IYD Logs - Iktel Induction Laterolog - Compensated Fo~r~ation Density Log - Compensated Neutron-Fo~m]ation Density Log - Borehole Compensated Sonic Log - Porosity Log P.l:easc Return Receipt To: Ms. R. A. Loomae / Atlantic Richfield Company P. O. Box 360 Anchorage, Alaska 99510 BL Line i'o- ____ Fro,,' J.. A. Rocho~/R..5:._l_~i.,,ue _ !':[,n'.--'.~i ~'-t'¢.'.d here~.:ith are the following for the ~,,~-,,~.~;~ ~ well' Ac:id or Fracture Treatment Log ' ............... .BI-IP Buildup & Flm,z Profile Survey Boreho2e Geo:net~9~ Log Carbon Oxygen. Log 'Casing Collar Log Cement Bond Log ....... Compensated Neutron Log - Cased Hole --Core ~alysis - Interval Core No. Core Description (aXlC) - Interval Core Description (Conv.) - Core No. Directional SurvDy -- · - - Single Shot - ~'[~ltishot · Engineering P'roduct~on- Log Fluid Analysis ..... . Fluid Density . Camma Ray Location Pi.at ~'lonthly Well Test Data Mud Log · Perforat~g Record State Reservoir Pressure Report ......... Surveillance Reports Temperature Log . Transient Pressure Smileys TVD Logs - Duel Induction Lat. erolog - Compensated Formation Density Log - Compensated Neutron-Fm~ation Density Log - Borehole Compensated Sonic Log - Porosity Log Return Receipt To: Ms. R. A. Logue Atlantic Richfield Company P. O. Box 360 ~chorage, Alaska 99510 Seale Xerox Sepia 'BL Line Date' D~_STI~iBUTED TO: STATE OF ALASKA VISION OF OIL & GAS North Alaska District Engineering TRANSMI TTAL. To: From: Well Name' J. A. Rochon/D. R. Jackson D.S. 1-].3 Transmitted herewith are the following for the subject well' ~m No. Scale Xerox Sepia BI, Line BHC Sonic/Caliper Log BHC Sonic/Caliper - Gamma Ray Log BHC Sonic/Gamma Ray Log Caliper/CCL Cement Bond Log/VDL Compensated Formation Density Log Compensated Neutron-Formation Density Con~ensated Neutron Log Core Analysis - Interval Core No. Core Description (SWC) - Interval Core Description (Cony.) - Core No. Directional Survey - Gyro Single' Shot Multishot Drill Stem Test - Test No. I~al Induction Laterolog Formation Density Log Formation Density Log/Gan~a Ray Gamma t~qy/CCL Laterolog Location Plat ~crolaterolog Microlog ~dlog - Interval Sample Log (A.R. C6.) - Interval Synergetic Log TVD-DIL ea. _ .... . }.ca'_ _ ,, .. ea. '"~ I ea 'ea. : ~ -- ea Receipt Acknowledged For' Date' Please retux~ receipt to' Attn' ~r. Donovan Jac'.:mon Atlantic Richfield Co?any North Alaska Engineering P. O. Box 360 Anchorage, Alaska 99510 #808 North Alaska District Engine_ [n__q&' T RAN S).I I T TA L J. A. Rochon/R. 'A. Logue Date' Transmitted herewith are the following for the subject well' Run No. Scale Xerox Sepia BL Line .. Acid or Fracture Treatment Log · BHP Buildup & Flow Profile Survey Borehole Geometry Log Carbon Oxygen Log Casing Collar Log ...'/, Cement Bond Log Compensated -Neutron Log - Cased Hole Core Analysis - Interval Core No. Core Description (SMC) - Interval Core Description (Cony.) - Core No. Directional Survey- Gyro .. - Single Shot · - Multishot Engineering Production Log Fluid Analysis .. Fluid Density Ganma Ray Location Plat Monthly Well Test Data Mud Log Perforating Record State Reservoir Pressure Report Surveillance Reports Temperature Log Transient Pressure Surveys TVD Logs - Duel Induction Laterolog -- Compensated Formation Density Log - Compensated Neutron-Formation Density Log - Borehole Compensated Sonic Log - Porosity Log Receipt Acknowledged By' . "---~,' 4;..X-":~-,,~- 8~/'' . P]ease Return Receipt To' Ms. R. A. Logue' Atlantic Richfield Company P. O. Box 360 Anchorage, Alaska '99510 Date' AflanticRichfieldCompany North Amer'~"'*-~ Producing Division North Alask~ ,Astrict Post Office Box 360 Anchorage, Alaska 99510 Telephone 907 277 5637 January 31, 1978 Mr. Hoyle H. Hamilton State of Alaska Department of Natural Resources Division of Oil ahd Gas 3001 Porcupine Drive Anchorage, Alaska 99501 Subject: DS 1-13 (44-7-10-15) Permit No. 77-59 Dear Sir' Enclosed please find a Completion Hi story, Multishot and Gyroscopic wel 1. Very truly yours, Frank M. Brown District Drilling Engineer /am Report along wi th the Drilling Surveys for the above-mentioned Attachments F~rm I) 7 SUBMIT IN DU~'.LI.'~.TE* STATE OF ALASKA ,,s~ .... 5.API N~UCAL CODE OIL AND GAS CONSERVATION COMMITTEE 50-029-20270 WELt_ COMPLETION OR RECOMPLETION REPORT AND LOG* b. TYPE OF' COMPLETION: WELI. OVER EN BACK RESVR. Other , 2..~,~,~ oF o,~o~ Prudhoe Bay Unit ^tlantic Richfield Company ~.w~.~o. a. ~ o~ o~,~,o, DS 1-13 (44-7-10-15) P.0. Box 360; ^nchorage, ^laska 99510 4. LOC~TmN Or WELL (Report location clearly and in accordance with any State requirements)* ~ruqDoe ~'ruanoe Ull POO I ~t Berf~¢e 11. SEC., T., R., 1~,~., <DOTTOM 662"S & 733'E of NW cr Sec. 8, T10N, R15E, UM At top prod. interval reported below 1301'N & ll16'W of SE cr Sec. 7, T10N, R15E, UM At total depth 1006'~ & 1375'W of SI cr Sec. 7, ll0N, R15[, UM 12. PEP~IITNO. 77-59 ,. .~... , ,.~ Ia~OW ~'~Y* ROTARY TOOI,,q ('AB E TOOI.N 10,740'MD 9432'TVD ]10,693'MD 9392'TVD ~ Sinqle All 22. P~ODUCING ZN~I~ERVAL(S), OF TI-IlS COMPI~ETIO~XT~TO~, BO37rOM, NAME (MD AND ~)~ ,').3. WAS D!RECTION~L ~ SURVEY MADE Top Sadlorochit '9975'~D 8775'TYD Base Sadlerochit 10,636'MD 9343'TVD ~ Yes 6. LIiiASE DF-.SIGNATION A_ND SERIAL ADL 28329 7. IF INDIA_N, ALLOTTEE Sec. 7, TION, R15E, UM 24.TYPE ELEC?RIC AND OTHEi~ LOGS RUN DIL/SP, BHC/Sonic/GR, CNL/FDC/¢AL/GR, CNL/GR/CCL __ 25. CASING RECORD (Report all strings set in well) CASLNC; SIZE 20'l 13-3/8" 9-5/8" 94# Welded/ H-4'O' 72# Butt / N-go 47# Butt I N-80~ ,, [J&L-95 LINE~ !R.E C O I-I.D 26. SIZE [ 28. PEI~PORAT£ONS OPF2N TO PRODUCTION' (i~tcrval, size and. number) ~/^ 7 T U 1311NG REJgO[;2) 30. PtZODUCTION DA'I'll] FillET PfUJDUCTION [ P~ODUCT1ON MtCI[iOD (Flowh'~g, F~as Iii[, pumping--size and type of pump~ al. OXSPOS~TZON or cas (Soid, used ]~r ~uel, vented, etc.) 29. 'ACID, Si:OT, FiiA. C'[ w'f{E, C~dLNT SQUL::?Z~, ETC. D12,DTIi IN'I'F~RV_~L (MDiASI.~UN i' AND I'~!i';i) OF MA,'IE:iiAL US'EX) ! I X', ELI., :¢']'ArI'u,~ ( Producing or 1VFATEII--I3ZIL. } GAS-OIL [iA.TIO WA.'I~BBL, ~ OIL GRAVITY-API (CO~.) I 1 tTP;S'I' W I'rNES~D BY 32.LIST OF ATTACHMENTS Drilling History, Multishot & Gyroscopic SuryeY~. ' 33.I hereby certify that the foregoing and attached information is complete an(~ correc~ as determined from all-available r~,c'~,rd,~ SIGNED_~'~ff_~?. ~~g'~ TITLE District Drilling_E_ngj_n~er ,,~,,,i,: .... !/3_1/78 .... *(See Instructions and Spaces for Additional Data on Reverse Side) INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report end log oc~ all types of lanJs and leases in Alaska. Item: 16: Indicate which elevation is used as reference (where not otherwise shown) for depth measure- ments given in cther spaces on this form and in any attachments. Items 20, and 22:: If this well is completed for separatc- production from more than one intervel zone (multiple completion), so st8te ~n item 20, end in item 22 show the prcducir~,g interval, or i~tervals, top(s), bottom(s) ~nd name (s) (if any) for only the intervjl reported in item 30. Submit a separate report (page) on this form, adequately identified, for each additior~al ir~te~val to be seperately produce:'l, show- ing the ,~ckJitionel data pertinent to such intervet. Item26: "Sacks Cement": Att,ached supplemental records for this well shouiJ show the deteils of any mul- tiple stage cementing and the location of the cementing tool. Item 28: Submit ,a seper8te completion report on this form for each interval to be separately produced. (See instruction for items 20 and 22 above). ,, 34. SUMMAI{¥ OF FOI~.MATION T~.'~'I'S IN('LLII}IN(; INTEI~.VAL TE.S'FET'). t)III~.~$URE DATA. ~C'OVERI~' OF OIL. GAS. 35. G~GIC MAR~ WAT~ AND MUD ~6. COIIE DATA. A'I'I'A('II 'llRIE? D~CRIPI~O,NS O? LITIIOLOGY, POROgITY, FI{AC~HF~¢. A~N.~ ~$ ~N~, D~I?ECTEI) SIIOWS OF OIL. G~S OR %V~3~!. m mmm mm m m m m m mm ,mm imm m mm m DRILLING HISTORY DS 1-13 (44-7-10-15) API 50-029-20270, ADL 28329, Permit No. 77-59 Spudded well @ 1330 hrs 12/5/77. Drld 17-1/2" to 2750'. RU & ran 68 jts 13-3/8" 72# N-80 Butt csg w/shoe @ 2725'. Cmtd w/5500 sx Permafrost II, 14.8 ppg. Drld FC, float shoe & 10' new form. Tstd to 11.6 ppg equiv. Drld 12-1/4" hole to 10,667'. Dropped multishot. Ran DIL/SP, BHC/Sonic/ G', CNL/FDC/CAL/GR. Drld to 10,760'. RU & ran 9-5/8" 47# csg w/shoe @ 10,735', FC @ 10,691', lower FO @ 2457', upper FO @ 2334'. Cmtd w/lO00 sx Class G cmt, 15.8 ppg. Opened, circ thru, then closed & tstd upper FO. Opened & circ thru lower FO. Sqz 300 sx Permafrost cmt thru lower FO. Closed & tstd. Did Arctic Pack job. Displ mud w/wtr. Ran gyro survey. Ran CNL/GR/CCL, CBL/VDL/CCL. Ran junk bskt & gauge ring. RU & ran 5-1/2" tbg w/shear sub @ 9754' pkr @ 9633', BV nipple @ 2187'. Pulled dummy valve. Set pkr. Tstd ~bg, OK. Ran 2-3/8" tbg to 10,693'. Displ CaC12 w/diesel in tbg & rat hole. LD 2-3/8" tbg. NU & tstd xmas tree. Ran CCL/Dummy Gun. Reran dummy valve. Ran long term press tst. Released rig @ 2400 hrs 1/2/78. n JOB No DATE REPORT and PLAN of SUB-SURFAC E 'COMPLET ION-REPORT ...................................................................................... -~jAN--5', i-~?-8 -ATLANT! C-RiCHFIELD CO~PAflY ............................................................. ~E'LL"-DS'-i'-I ~ ....................................................................... RADIUS OF CURVATURE HETttOD OF COHPUTATIOH K B EL[V, -A LL'"-~ A LC-OL-A T IONS -P E R F OR~ E D--~ ?---i --B -~T-~'L-E~-T-~b-~'I-C-~-O~PU~-E-R ' ................................................................................................................................................................................................... -,EA50 ..... DRIFT 'VERTI(:AL .... SUB ........... DRIFT ............... TO-TAL-'"COORD'INATES .................... C"-L'"O'""S"-~i--I~--E'-'-$ .................... ~E~ER'i"YY ....... SECY"i'bN- ~ -OEP'T i~-'~-NGL~E .......... DEPT-~ ........... ~EA .......... DI'R'E~ '~'I'~TX~'CE ~*~L'E ~'EG'/100FT DISTA~ ..... 3216'-10 15 3212.8~-'3119'85 $10.00W ........... 72.75-S ................ 1082'~ .............. 72-~79-$ ....... i-'-26-X~"-'W ........... -'3~"?'~ ..... 1'i'-30 ~273~-~6- 3~'o0-~7~ ...... ~17~"~' ~4';-X'~-'~ 4,55 w 84025 $--3--5 ~9 W 2.065 -3476'i4 45- 3466°~4 .... 3393.54 $2~000W .... ~-2~;'46--S ............ 2~,16' w ............. 1'Z7~1 $---X'~ ...... 1"'~'~--~ ..... --3787'-22-30 ~7~;0'3 '~88';'6'~-----$2~-60~ 216.~8 $ 61,74 w 22501'[---$---[5 ~ 7 W 20492 ~4P~4 35 ~o 4675~04 ...... 4602'~04 ...... ~32.00W 704~23-~- ...... ~6-.77-W 78~-;98 -'5~'~7-~0- 0 5305;12 5232;'~'2"' $2'g'~OOW i-i~'5~'87 S 593,86 W 1281,74 -"6~9~-38 ..... 0 -~Xn~,'-~o ...... 61'~0- -S~S~O~- .... i~s'?~-o-~---S- 9-07;-~9 ~ ~9~s~ -9925 29 0 -- B800,86 -872T-~'B6 ..... S~2~O'OW-- 3249'~56 S--175-2~'07-~ ..... 36gI'~80'-S--2~-'19--~-6--~ - 10667-30-30---9445-,05 9372;05' 53-5'*"0'0~ 35~'7~5-~--19~1'~11 w 405~.49 .............................................................. 61.87 120~.30 R,317 4~7070 10002 ~73,8~ 0,606 78308 00856 1065023 O,ZTO 1281,21 0,41~, 17;~7.23 1976038 0,3S2 2{05,_81 00~3X 2606099 ' 00343 3078,77 , 0,674 3R94079 0,462 3§58,69 ~ 00316 405404,9 ~OTTO~ HOLE CLOSURE: '-~05~;4'9 FEET-AT-$-29'-i5 ~'0-'9~ {~iEASURED DE'PTI,,{ AND OTH£R-"'-DA'TA "FOR-EVE:R'Y--'£9-E~"-IOO--F£ET:'OF'-"SL-JB-SEA--D'EP-TH, ............................................. ~: TRUE ................................................................................................................................................................................. : IqEA"$[IR ED ............. VER T I CA[--SUB ..... lq D'"~T VD 'V~'I~-T'FC~[: J DEPTH ...... DEPTH - ~EA'D'IFFEREN~E ............ CO~REC'TI-O~ ................. TOTAL ...... COORD-I'~'AT'E$ ,: .................. 173 ..... 173. .......... 100 ....... 0 ................................... 0 ........................................... 0;-09--S ............ -0-~'00-"'~' .................. 271 .......................... 273 · ............. 200 ...... 0 ............................... O' ...................................... 0 ~-2'~-'S .............. -0'-~00 W ............................ ~73 ....................... 475 · ............ 400 ........... 0 ............................ 0 ........................... 0" 72--$ ..................... -O-~'O0--W" ..................... 573 .............. 573. ........... 500 .............. 0 ................................... 0 .................. 67 ~ .................... 67 $ e ..... -600 ..... 0 0 1:4' 6--5' 0-~'00--W' .......................... 773 ................ 77J~ ............ 700 .............. 0 .................................. ........................ 073 .................... 87)l. ............ 800 ......... 0 ............................. 0 2,'46- $' 0-"00- W ~'73 '973 ~ ......... 900 ..... 0 O' -- 3' ~;'06--~ O'~;O O-'-W -- .................. 1073 .................. I073' ..... 1000 .......... 0 ................................... 0 ........................................ .......... ....................... 1173 ...................... 1173. 1100 ......... 0 ................................ 0 .......................................... '~ "2 J"'-~ O-e-O0-l~ .............. 127'3 .................... 1273' .......... 1200 ........... 0 0 .......................................................................... ................. 137:i ........... 137]. .... 1300 -- 0 ................................ 0 ............................................ 6'09 S ..... O..O0"-W .':~ ...................... 1473 ............. 1473. ........ 1400 .......0 ..................................... 0 ..................................... 7.01- 1573' '1 ~7~ ~-- I500 ...... O' '0' 7';'99-$ -0' ;-00-lil' 773 873 1'8711. ...... 1800 ......... 97~ ............ 1973. .......1900 073 173 ~73 573 .......... 167~. .......1600 .........0 ...................0 ................................ 9.04-5 ............. O,O0-W .................. 1773. 1700 .... 0 .......................... 0 .......................... 10,16 & .......... O.O0"--W ............................... '0' '0 I'1';'$~-& O,O0-W ....... 0 ............................... 0 ....................... 12'JB $ ............ O,O0-"W ...... 2073. ...... 2000 0 ......................0 ................................. 13,89-'& ............... O~'O0-'W -' 217~ .... 2100-- -0-- 0 I'§~-Z6-$ O~O0--W 2273. --2200 .............. 0 ........................ 0 ................ 1'6.69-'-5 0"00-'~ 2373,-'- 2~00 ........ 0 ....................... 0 ......................... 18,20 $ .......... O-~O0--W 2~7~'~----2~00 ..... 0 0 ~9",75 5 O~-O0-i*l .............. 2573,- 2500 ...... 0 0 21,39 $ ........... O',O0--W' ............... 35B7 ............... 357~' ......... ~500 ...... l~ ............... 673 ................ 267~J, ..... 2600 ...... 773 '2773~-~700-~' 873 ......... 2873. ..... 2~00 97/+ ......... 2973~ .......2900 .......... 0 0 074 ' 30? ~';~3-000 .... 1 ~76 ............. 3173, .... 3).00 ........2 ........................ 2'/7 ......... 3273. ...... 3200 ..... 4~ 3 fi 0 337 ~"*------3 300 6 o;-O0-w o", ~.~ E '2~-18--E i~,--97 W 22-.-83 ~ $~+, 30 W "HEA S UP. E' D' D EP T H '"-AND OT HE R--DA IA' 'FOR :" EVE. R'Y"-~ E V EN--I'00---FEET-O F-SUB--SE-A--DEPTH, 'rRuF 3692 ...................... 3673, .......3600 ............ I9 3'800 ................... 3773;; ..... 3700 ....... 26 3"~I-O ~'8-?~-;'- --~'000~ -31' b022 ............. 39~3, 3900 .... ............... 4 1 ~ ....................... 4073; ...... '~0'O0 ........... '42 5-~ '41-73 ~T0'~ 7 2'21'~-05- 5 1'1 '2~1 ,-~79--'~ 12 3~7;-~-~' $ 106,56 w 15 357°63 5 135,04 W 21 467,79 $ 207,{0 W 4739 .................... ~57S. ........ ~500 ........ i66 ................. 22'.~; ...................... -6-4~';92 S $09,26 W ....................... 4 fl61 .......................... 4673, .... 4600 ......188 22 7~2'; 7'5--5 .......... S-~'5-;"8'~--~- ...... ................ ~llO '" 48T3, ........ 4800 .... ~)T .................. ~'~ ............ ~5 ..................................................... 829,63 $ ........... ~22;"~'2-'W .................. 523~ .................. 4973, 4900 ..... 264 ............................. 27 ........................... 897.38 $ ....... 461~-46'--W ....................... 536-6 5073'~ .... 5000 --"292 20 ................ 5495 ...... ~- -'5173. ......... 5100 --' 322 ............................. 30 ................................ 1039.64 ............ 562.5 ..... ~27~e ~200 ..... S~2 ......................................................... SO ~1 ~28-"~ ........... S80;78 ~ .................................................. S'756 ...................... 537S; ..... 5300 .... 382 30 1-'1'85';~'T~ ...... ~2 l-;-it W ............... 5~B5 .............. 5473. ........ 5400 ......412 .................... 30 ............................ 1257~ 78'-'S ....... 66'0-~- ~9 W ................ 6013 .............. 557~. '; B500 ...... 440 ..................... 28 ......................... 1329;20-"S ............ 697~87 W - '61. bl 5673;'-- ~600'~'$-8 --2~-- I'399-;'71-'S "75~;21 W 6268 .................. 5773. ........ 5700 ....... 495 .................... 27 ....................... 1469;32 & ............ 769;2S' 'W ........... 6394 ........... 5873. .......5800 ....... 520 25 -X 538-e'05--'S .......... -6'52n ~B973~ Bgo0' ~ ..... 26 ~6~'Y;-O~ 836,40 w 6646 6073, 6000 572 ~6 1676,~9 S 869,52 W 6772 617S, 6100 599 27 1746,~b 5 902,4~ W 6809 627S'; 6200-~26- 27 ll'l?';-O-i' 5 -936.00 W 7026 637~, 6300 -6~} .................... 27 ..................... 1886,8} $ ............. 9'70';97-~ ........................................ ............ 7153 ...........647}, 6400 ..... 680 ........................... 27-- 7279 --'~57)';---6'500-- 70~ 2~ 2~23.3} ~' j044~68 w 540,52 W ' 7406 ............ 6673,- '-6600 .... 733 --27 2090;B3' -S .... X0'82-~9(~ W ....... 7531 .... 6773. ........ 6700-- 758 ................ 75 2156,99-'5- -'lIIS;'76-W 76~ ............... 68'73. 6'800 .... 782 2-4' -- 22'22;-8-8--$ .... i-i-5-2'-;'-1-2 W-- - 7779 6973. - -6900 ..... 8{06 ............. 2-4 .................. -2288,1'3'-'$'- l-lS'3;;'Ol'-W --7901 ....... 7073.. ....... 7000 .... 828 .......................... 2;2 ..................... 23-52;62 S ....... !212-;00 N '-HEASURED D~PTH :-AND -OTHE"--DATA-'FOI~ EVERY-EVEN'-IO-O---FEE-'T-*-OF-'*S'iJ-B--SEA--DEP TH. TRUE 9E'iII-T 802'J ........... 717!t. ..... 7100 85o .............................................. 2'2 ....................................... 2~1fi~92-~'S ~144 ............. 727~. ......... 7200 '871 .................................... ~'1 ........................................ 24~a"01 .................... 8505 ............ 7573, .......7500 ....... 9t~ ~0__ ................. 8743 ....................... 7773. ..... 7700 .......... 970 .......................... 18 .................................... 2770;46---S ................. 88'61 ............. 7873. ..... 7SO0 ......988 .................................... I8 ............................ 28'2~'"~'6B 'l ........ l'iS'i'*i 5 a--W" 8 gTR .................. 7973 ,- ..... 9~00 ..... I005 ...... l'T 2876; 9 ....................... 909~ ........ SOTS. .... BO00 - '1021 ............................... 16 ................................. 2927,~0--S ......... ......................... 9209 ............................ 8173, .... 8100 10t6 ............................... 1~ ................................. 2976;-0D 'S ....... 9~ 827~, .... 8~00 ...... 1'051 1~ ~023~1 ............... 9138 .........8~73e' 8300 1065 lk ................ ~068,6~-"-S 9552 8173. 'B~O'O ~-1079 14 112.5~ ~ 1'639~'~ 9666 85T~. ......... BSO0 1092 1~ ' 1'5~86 ...... 1'672'*-15~ ................ 9779 ................... 8673, ..... 8600 -1'106 .....................14-~ ............. 1196,51 S ...... ............... 9~93 ~' 877~. 8700 -1120 .................... 1~ .... 32~B,00 1000~ 887 ~,- ...... 8800 ....11 ~ 1~ ........................ ~2 79. 10122 ............ 897), $900 11~9 ...................... ).5 .................... ~)22.09 1()237' " 907~. .... 9000 '116~ .................. 1~-- .......... 336D 71 '10~52 ..............~ 17~; .... 9 lO0 .... 117~ 1'5 ~ 10,'42--'ff .....1886-; 9~ 10~68 ............ 927~e--- 9200 '119~ ........................... 15 ................ ~55'32 ......................................................... TRUE ................................................................................................................ ~ VERTICAL SUB DEP TH DEPTtt SEA TOTAL COOED I NATES ................ - ........... 2000 .................... 1999. ............... 1926 .~000 ....... 2999, .......2926 ~000 .................. !t953-* .... '~880 ........................ ~000 ...................... 478~ ...... 1TI l ......................... :6000 ................. ~62~ .... 7000 6562'~ --6279 .................. 8000 ............... 715,~ ...... , ~ ,'2~:~--~' 0,00 w 9000 7991 ' ........ 7918. 2856' .~5-'$":'::'---i'490-,; 6~1 w 'I 10000' ,866;--'879:~. 32'7~-~-7g-S .... 1-776-~ 29' w . ~ HORIZONTAL VIEW SCALE I"=1000' ATLANTIC RICHFIELD COMPANY DRILL SITE I-I.% RADIUS OF CURVATURE MAGNETIC; SINGLE- SHOT 6000 6400 68O0 720O 7600 '8000 9200 TVD: 9,44'5' TMD: !0,667' ~600 ALL DEPTHS SHOWN ARE TVD. 400- 1200- VERTICAL SECTION SCALE !"= i000' ATLANTIC RICHFIELD COMPANY DRILL SITE i-15 RADIUS OF CURVATURE MAGNETIC SINGLE-SHOT 48~ I ALL DEPTHS SHOWN ARE TVD. TVD = 9,445' TMD = 10,667' '/ Eastman / '., Whipstock 2 )~ A PETROLANE COM~ REPORT of SUB-SURFACE DIRECTIONAL SURVEY ATLANTIC RICHFIELD COMPANY #1-13 WELL NAME PRUDHOE B~¥ LOCATION JOB NUMBER A1277 ~S0188 TYPE OF SURVEY MULTI-SHOT DATE 1-4~-78 SURVEY BY JEREMY BEATTIE OFFICE Eastman Whipstock A I~'FIOLANE COMRNVY P. O. Box 4-19701Anchorage, Alaska 995091(907) 272-1032 7WX 910-881-5066/Cable: EASTCO January 4, 1978 Atlantic Richfield P.O. Box 360 Anchorage, Alaska 99501 Well Number: 1-13 Location: Prudhoe Bay Type of Survey: Multi-Shot Date: 12-21-77 Surveyor: Jeremy Beattie Job Number: A1277 SO188 Attn: Bob Hines Dear Mr. Hines; I am enclosing the original and twenty-seven copies of the Multi-Shot survey run on the above mentioned well. We wish to take this opportunity to thank you f~r calling on our services and trust that we may continue to serve you in the future. Sincerely, Edward J. Butler District Operations Surveyor cc: file eric. EJB/jab C 0 M_ P_L_E~__I_O_N _.~_E P O_~_T A T L i. :',l t I C R I C H f I E .L,.D_...C..O_.?.~ P__A_._NZ__, W E L L_D S MAGNETIC MULTISHOT SURVEY DEC.L_[N.A_T_IO~ 31_ DEGREES EAST R E C oR.D_._PF_ S U .~VE.~ ALL CALCULATIONS PE.B_~O..R._?I__ED____B_Y__..._]_B_H.. EL.E_C_TRQNI_.C__CO._~J.~UT. iE.R ....................................................................................................... ...... .......... HEAS, DRIFT VERTICAL SUB DRIFT TOTAL COORDINATES C L..O .5 U. R E .... S SE.VER]:T.Y DEPTH ANGLE DEPTH SEA-- ........ D i_R~C'iiiii"~ ....... "'~"i ANCE ' ANG.LE .... DEGt iOOFT D Ia ,-AhiC b ~ DEG. D M S 2750 0 0 2813 4 0 __29o6 6 0 2999 7 0 2997,99 2750.00 2677 '00 ........ SZ,Q._OOE .............. 0_,. O0.__S__- ........ .O...~__Q.O__~ ........... 0.00_ ,.S 0 ..... 0 ..... O.._W ............ O._OOO ........... 2812,94 2739.94 s2. O~OOE' ............ 2,06 $ 0.75 E .............. 2,19 S.19 .... 59..59_..E ............ 6,34% ........ .... ~_90~_,_~_~_ .... ~.~3_.~._,.~? ..... S_~.3..O0.[ .............. ~..,e~ .... S ........ %.,..P.~ ..... E ............ ~0.29 S ~ ? 14 48 ..... E ............... Z,_.~Z .... 3092 8 30 3090,13 3184 10 30 3180,87 3278 12 0 3273.06 337[ ~4 0 3363,67 3465 ..... i5 45 3~5~,52 3558 17 45 35~3.57 3651 20 0 3631.56' 37~3 22 0 3717.~5 3837 24 ~5 3803.72 3931 27 15 3888,20 4025 30 0 3970.70 4119 32 0 ~051.27 4211 34 0 4128.43 4305 34 45 4206.01 4399 33 45 ~283.71 2924,99 $ 5,00W 20,29 S 3,78 E 20,64 S .10 3.3:..45 E ............. 1,113 z z 3 .......... .........z. s .... z 7 7__.E ....... ~3107,87 S 9.00W ~7,36 S 2,01 W ~7.~0 5_ 2._26__.2.~ W ...... 2,193 .... 3200.06 st~,--Ob~ .... ~5.~3 s 6.~' w 65.~'~ s ._5 39..~_~.._.W ............ ~._66~ .... 3290.67 S17.0'0'W 8'B ,-~ 2--'$ ....~-~'. 91 W ....... :86 --3381.52 S19',~)~)~ 107.97 S 20.36 %'/ 109 --347~-~-5-~ ..... $2'~--,00W 133.15 S 29,53 W 136 3558.56 Sz2.0ow ...... ~ ~ i',-z'~' "'S- ...... ~-~' ,~-~- ~ ............ ~?~o.~z sz~"O0',~ ...... 2Z~os s 6e.~ w 'zs~ ............................................................. ~897~70 S~OOW ~00~7 S ~29 W ~20 ...................................... ~~978 ~27 S~_I~ 00~ ........ ~.2 ~ 07 S ~6, ZZ__~ ........ ~0~*~ S~OOW ~8~2 5 26~ ~ ~7 ............................... .0 · O0 1,~.2 7.02 15.7~ 27., 5S _ ~+2.12 4a92 33 4,5 4361,0A 4585 3,~ o 44s_8_,_z.D 46'~9 34 45 4515.83 47'~ 3 35 - 45 ~.592 · 60 4867 36 0 4668,76 4133,01 S36.00W 427.79 S 4210,71 S29,00~ 472,38 S 42.8.8_,_. O_~____S 29_. ~_OW 5_17,57 .43_.~.5.,._2~__ S 29 _~.0_o ~___ 5_ 62 ._~ 1 4~+42,83 529.00W 609.33 4595.76 529,00W 704.95 S 193.58 W 221.99 W S 272,17 W 5 297,90 W 324,2_0.. __35_0,_~1 _469,55 5_2~ 20_51__W ...... 1.,056 467,41 _5_2 ! .9 _4 S_~ 5._ 10._l_~_W ...... 2,533 ........... 520,.2~ 5_7_ 3 · 51 _.5 ._25 30 _.55 ~ ...... 0_, 0.00 ............... .571., 9, 625.,25 $_25___48 .... ~5 W ......... 0~269 ...... 6Z3~7. 6_7.8,25 .... S 26 .... 3__1~ W _0_.,_7~8 .......... 676,8. 732,.~.~___5_26_ ~6._.Z0 .... ~ ~,Q6.~ .............. 7.~~ 78_7 ,~.6. ~ _2 6 _ Z 7 .... ~ 6. ~ ..... 0_, 266 ...... ~ 86 ~ 1 ':-'--XRCO~ D5 3.-,13 MAGN-ETIC ~W.U_TI__=~$HOT' -~SURVEY RECORD OF SURVEY ALL__ _C___A_.~ C_ .U_L_ A_ T_ I_o~.$_ _P_ E_RF_O~M_E_~ _B_Y___I___8_ _~.___E_ ~. E_¢__T R__O_N__LC__ _C_O_M_ _P~_T_.g__R T R U E .~OG- LEG MEAS, DRIF DEPTH ANGI T VERT ! CAL SUB ......... ~.R~ __ ~ .~l ...... E DEPTH SEA DIREC D M DEG. ......... _g .._L_Q_ $_... u._g ...... 5.__S ........... _SF.._VEB IT_Y_ ............ SEC T Z ON I_S_T_AB,gE ............ AN_G L.E ....... .D_E_GZ 10 OET_ ............... D I 5 T ANC __.D___~.__~_ 4960 36 45 4743,64 4670,64 5052 38 30 4816,51 4743,51 5145 39 0 4889.04 4816.04 5238 39 0 4961.31 ~888,31 5331 40 0 5033,07 4960,07 5425 40 0 5105.08 5032.08 5519 40 0 5177,09 5104,09 561_3 40 ~ 3.0 ~._248,83 5707 40 0 5799 4,0 0 5391,05 ' 5318,05 529,00W 1219,73 5 L,,ll5 841_,3,_1 2 ,_2~8__q.- . ri9 7. 0.5_38. 9. .)~ 6_6 0_.,_&_8._4._ ...... 113~ 3_, 7_4. 5892 40 30 5985 40 15 6079 40 15 6171 ~0 0 6262 40 0 63~5 39 ~5 64~.8 39 0 6541 39 15 5462,03 5389,03 $29,00W 1272,29 S 665:~45 W 5532,88 5~5_9_,8.8_ ...... .S~_.O_,__OOW 1324072 S 685_,_.12 W 560~m_62___._5_5_3_!_-62 .53__0__~.9_~___1377,32 $ 725.49 W 5674,97 560_1,97 529,00w 1428,92 S 754,68 W 16..!5_,_9_7___5_27 5_0_2_6_W __57~4.6_8__~_67_!..~8 ......... S3..o,oow 1~79,83__s 783,49 58~6,0_5___57~_3_,_05 .... 53_0__,__00~ _.15_3j._,_47_5__ .... 8.1.3__,_30__~ 5887,94 581~,..9_.~_ .... _529,00w 1582,82_.$ 8~2,35 w 5960,09 5887,09 .... 529,00w 16_3~,1~ 5 870..;_80 w 1_6_8.6 ,_8_3_ 5 8_9_~_,.4.Q_V3 .......19_1.1,6 3 _S_ 2_8 ...... 3 ._5_8 .... W 0 ,.9_11 ............. 19 6__7_ 72_~__9_0 O.__6_lQ2.97__6Q2_R. 9.7___.S28.00W 17__3J_,_0(+ S 9~2_7_,&3 W 1930_,1.6-_5_28 3_5_lJ___~..,_QOD 6~_2_0___4_0___15_____6.1._'L~_,_0_8 6_1_0_!.,_0.8 ..... S2.8_,_OQ.W _1__7_9_~ _,_9_6__$___9_5_5_,_~_1 W ........ 2_03_Q,7.0 .... 5_2_8 ....~__~_A__W_ .... 0,269 .......... 2029 69_13 ~_0]_0 62_.~4_,_9~ 6_1_7_1_,_93 ..... _528.,_0DW 18~_.5_:1~__5 983,59 W 2_09_0_, .. 7007 ~1 0 63L~,%4 6.2b~_~_1~ 52_8_~_0_0W 189__9_,_3}_5 1_0_1_~_3_9 W 2~ 5_2_ ,.3_0 5~8 _~ W 7100 4O 0 6_386,86 631_3_,_86 52.8,00W__!_~.5__2_,6_6__S 1040,~5 W . 71_9__2_3_945 6_4_57.46 63~4,z+6 52_8_._0_0_W 2_0_04,745 1068,44 W 22._~!_,_62__5___28___3__2_0 W ii 7286 39 0 6530__'--12____--6__~--53. '.--12---- S 21.'.O. OA' 205--7----' 63------5 1095 '--9--kW 2331.*..3--1----5--3--8--, 2 29 W 72L7_6__~_9 .... 0 6_6QO_,_O3__f:S27_,_03SZ6.~OQW _210_8_,.3.2_S 1121.,2_,5 i',' __2_3LS_7,.R3__S__28 ..... _0.__1._8 W ,. 7470 3_8 3_0 6673,,3_7 6600_,_3_7 $21_,_0_0_W_ 2_160_,_9_7 .5_ ll_q,,_7_,_5_O_3L_ 2._6_6_6 ,. /5 ,5_2%_;,5_8 7 W 7564. ~ 8.. 0 ~, 747,1. 9 6_6_lk,..19 $ 2.5_,_.0_0_W 22.~_,_21 _5 1173.0 0,2._6_9 ...... 20 9 O- O_ 0,5 32 .. ZiS_.L 1-_0_7_5 .......2211_,_7~ 0_.2_7_2 .... 2270_._7~ 0,902_. 2330_~ 0 ,_699 ......... 2.3.8 0 ,_6/3_ .......2_q. ~5 TRUE__ DO_G_LEG MEA$, DRIFT VERTICAL SUB DEPTH ANGLE DEPTH ,.SEA D M DR.!_..F..! ........... _T__OTA_._L_.QOO._RD__I_N__A._T_E5 C L __O__$.__U_Ig_E_.$ .... ,5E~/EgLT_Y .......... 5ECTiO. N D I R E._C_ _D._.I...$_TA N¢.E .................... AN_GL E ......... _D_EG / l_O.O_FJ ...... DI$_T ANt. D E G, __ D. ..... N 6 ..... ...... .... ..... ............. 80L~ 36 15 7118,13 7045,13 $27,00W 2463·78 S 1295,18 W ___2._'[.8_~..,.~.!_.$__2.Y___~.3__...~Lg~ ...... 0_,..6.29 ........... 2-18.1..,_.~--7. 8121 8214 8308 84O2 8495 8588 8681 8775 36 0 7193,25 7120,25 S2_._7_,.O_O._kJ __2__5_1__2_,_.6._3__S.___1~_.2__03 07 w __2__8._3_i_,_2_9__~_.2~_._~.2.__5_8_.W 0..,269 ....... 2.8_3 3 6 .... .0. .... _7_2.6_8_,._4.9_ ..... _7._!._9..5__.,. ~.9 ...... 52.7..,_0_0.__.W ......... 2.5_6!_, ~.~..__$ ...... 1_~.~.~_._:. 8.9.,W_ ............ 2_8_~.2..,9_.5_._5__Z~__._ ~2 ...... 10_.W_ .... il.,~lO Q_ ......Z 89 35 45 '~ 3 ~+~+ 66 7271 ,.._6.~_____s.Z_7_,..O...~...W__ 2~3_0__:~+ z s 1_~_.6~...~_0_3~ .... z , ~ ~ 1 ~ 7421 ,.i._e .7348, ~ e ...... $2..7...: ~_O._..w ........ 2. 6.~.9_,._0._~ .S ..... 1~_.~+_:.68 w 3_0__0_z..,_62__.~_ZT__~o_.3.%_w _0_,6_s z ....... 3o 0 ~ 0 7497,25 7424,2~ ~.2_7__~_,_0._0w 2706·73 $ 1418,97 w 30~6,12 $ 27 39 5...~_.._~_ .... 0_.~2_69 ............... 30~.,.1~ 34 4~ 7~73,~ 7~00,~ $26_,_0._0w 27~+,32 $ $..4~8_,70 w __~_1_0._.9_:_2.9__$_2.7._3_.8_~.3_.__.W. ....... D..,_~_~ ........ _s_~___.~__O__ ?___6.5_0~._o_8_ .... L%77._,.__0.e ........ s_.~..~_,__0_o_!_~_ ..... z_8_0_1_,.._~_0____s_._ 1_~_6.6_.,_67 w s 1._6.z,.1 z_ $__27_ 3_L__~_.w_= ......... .~. ,..7._4 0. ........ 316 34 15 7727·66 7654,66 $28·00W 2848,26 S 1491,60 W '3215,20 5. 27 38 26 W 0,266 ~213.0.~ 8868 34 0 7804,65 7731,65 528,00W 2894,33 $ 1516,10 W 3267.37 S 27 38 46 W Q.~.g~._9_____ 3.261,~ 8961 33 45 7881,86 7808,86 530,00W 2939,66 5 1541,23 W 3319,19 5 27 40 2 W 9054 32 45 795'9;~-~---~-8-~'~-;-'~3 531·00W 2983,60 S ~567,11 W 9148 31 45 8039,13 7966,13 S31e00W 3026,59 S 1592,94 W 9283 31 15 8120~_13 8047,!_3 ..... ~_~.~,~9~__.~_06.8..,.~.!__~ ..... !...6.!~_,87 W 7 3~ 0 8200,60 8127,60 S34.O0W 3109,66 5 _1645,34 W 933 9431 30 30 8281,38 8208,38 537,00W 3148,79 $ 1673,2~ W 952~ 30 0 8361,72 8288,72 S38,00W 3185,95 5 1701,76 W 9618 30 0 8443,13 8370,13 S40,00W 3222,48 S 1731,34 W 9710 30 0 8522,80 8449,80 542,00W 3257,19 5 1761,52 W 3370,12'5 27 42 37 W 3420.19 5__27 ~____3.0____W 3469 ~3.__~_2_7_~8 43 W __ 336~,7~'~ 27 ~9 9 W 3611,97 $ 28 6.__31 W 3658,13 $ 28 14 32 W 3703,01 S 28 24 17 W 0,7 !._6__ ............ 3. 1_,_!2 0 .... _33 6_ 8., _0_3 1..,.0_64_ .... 3 .O_,_5_9_B. ....... 3~+ 67.,_7_; 0_,_624 ~__._3,5 .),2.~ 0 ·979 __ I)_,_6_0_1 ..........3 6 L,9_64 3_ 6 1 · O 87 9804 30 0 8608,21 8531,21 542,00W 3292,12 5 1792,97 W 3748-!! 5 28 34 25 W__ 9893 30 0 8681.28 8608,28 S41,00W 3325,45 S 1822,45 W 3792,09 S 28 43 27 W _0_ ,_ODD __37__~ 7., _9_~ 9990 10083 30 15 8765,18 8692,18 S4!.,OOW 3362_,.!_9___5---_1_8__,5~.09 W.. 30 15 8845,52 8772,52 541.00W 3397,55 5 1885,13 W 10177 30 15 8926,72 8853,72 S40,00W 3433,56 S 1915,88 W 10271 30'15 9007,92 8934,92 $41.00W 3469,57 5 1946,64 W 3_8_3_%,.6_8_5_2_8 5 2 4..3~~ 25 l~ s 839 · 2! 3885,49__5__2_9_ !__.2.. ~ W O_,D_QO ....... 3 ~ ~5.,2J 3 9 3 1,91 5__29~ 9 3_ 9 W 0.,5t6 3.93_1~_7S 3978,3~ 5_2_9,.17 Z+2 W 0_.~_3_6 3.9_7_8_~.2j RECORD Of ,SURVEY ALL CALCULATIONS PERFORMED BY ! B H ELECTRONIC COMPUTER T R U E MEA$, DRIFT VERTICAL SUB DEPTH ANGLE DEPTH SEA DR I??_ ..... T_Q_T_..~.L__~OQRD_I_N_A_T_ES__: ............. C k_._O._ S_U_B_E_S____ SEtLEP, J~ ..........SECTION D I REC D 1 STANCE ANGLE D E_~/_.],.Q.O.LT_ ............ D.I.S.T_.AN~ O M DEG, __D_._ M I ~ 10364 31 0 10459 30 ~5 10552 3_0__~0 10567 30 30 10667 30 30 10740 30 30 BOTTOM H O__L,__E 9087,95 gO14,g5 542,00W 3505.,_0.;5__S_ _1_9!~._,_Q3 W 40_.2.~_,_.6.1 5__29_2_6__!_5_3L .. 0.,_855 ............. _~.02~,.62_ 91_6,9. ~8 gog6,48 g 262 ,_~ ~___~.~_8_~._,~ 93~8,60 9275,60 S3.~,OOW C~OSURE ~21~,~2 FEET AT S 29 ~6 ~8 W A~CO DS 1-~3 MAGNET ! C MUL T_[SHOT '$UI~V_Ii._Y_ ............................................D£C_30_! ....19_7_7. MEASURED DEPTH AND OTHER DATA FOR._.~.V,E_R_y~._V_.~N 100 FEET OF TRUE ASURED__ VERT ! DEPTH DEPTH SEA DIFFERENCE COBB_~_C. T_~_O_~_ ......... _~OZAL___COOBDIN. AZES_. 173 173. 100 273 273. 200 373 373, 300 473, 0 0 0.00 S 0.00 W __ ~_o_ .............. _0 _0_,_0_ O__s_ ....................... 0.. 00 W 0 0 0,00 S ......... 0,.00 .... ~ 573 573, 500 0 0 673 673, 600 0 0 773 773, 700 0 0 873 .873, 800 0 0 973 973, 900 0 0 1073 1073, 1000 0 0 0.00 5 0.00 S_ .........._O_.OQ W 0.00 S ....... ~_.0_0. W 0.00 .$__ 0.00 5 0.00 $ O.OQ~ 1~ 73 L!7_3_~ l_kO.~ o , 0 12!3 1273, 12oo o __o 1373 1373. 13oo o o 0 ._0_0 .$ _ _ O_._O_O__W 0.00 $ 0.00 W 1473 14 Z_~_. l ~,__0_0 0 0 liT3 !_.57___3_~ 1500 0 0 1673 1673, 1600 0 0 17.7.3 . 17 ? 3_'.__.!!0_0 0__ ~ ~ 0 1873 1Sl.3_., .......... lSO0 0 0 1973 1973, 1900 0 0 2_0_7_3 2073_.__2000__0 2_ 17 3 2 !73. 21.QO 0 22._73_ 2_2.Z 3, 22_00 2373 2,,~_'~.._._2 ~_00 2_~_7_ 3 2/+73.,__2400 25_7~ 2_~7~_. 2_500 0 ._2..673 2__8_.73. 2600 0 2773 2773, 2700 0 0.00 S O,QO W · 0.00 S O.__QO W 0 0,00 S 0 0.00 $ 0 0 0 0 O.O0 5 .0 0 ,O 0__3~ 0 0,00 5 O__ 0.27 S 0 ,_10_..E 2873 2873. 2800 0 0 6,69 S __2.23__E 2.97z* 3075 .297___3_, 2900 O. 3073, 3000 0 1 30.15 S .2.06 E 3176 3173. ~100 2 1,77 W 3278 3273. 3200 4 2 65,11 S 6,44 W 338_.l 3373. 3_3_0_0_ 7 3/+73. 3400 11 3 87 ,_26 S ~ 112,90 S 13.6_0 22.08 3589 3573. 3500 15 4 142,15 S 33_. _O_!__w H AGN F~T-LC-MU T i ' OEP E_AED__O_I~ER_DAIA_EQR_E.V. EgY__E.VE.B_iO.Q_EEI]~_QE_$UJB_S.EA_BEB. IH, /. ~.. T RU_E ......... HEA$~J_~R_E_.D__ . VERT ! CAL SUB MD-TVD VERT [ CAL__ DEPTH DEPTH SEA DIFFERENCE CORRECTION T 0 T AL____~.,O_QR_D.!_N__A._T_E $ 3695 3673, 3600 22 7 175.3~ S 3803 3773, 3700 30 8 212,46 S 63,68 3914 3873, 3800 ~0 10 4,028 3973,' 3900 54 14 4145 4073, 4000 71 17 4265 4173. 4100 91 ~ 20 4386 4273, 4.200 113 _2_2_~ 4,506 4373, 4300 133 20 3 q.!_~.Z Q _S... 3 5 3,7 8 S _..19.3,3 8_..~ ........ ~__ 4 o 9 ..2_%,~ ..... _1_.8 0 ._3 4 w 524.38 S 250.81 W 4627 4473, 4400 153 20 583,54 4,372 4673, 4,997 ~773, 5124 4873, 5253 4,973, 5383 5073, 5514' 5173, 4, 70Q ...... 2..~ ...........: .......... 26 ........................ 773_, ~_~___~ .......387.,_1 ~ 4800 251 28 841e9815 ~25.1Q 4,900 280 29 912.30 S 4~...,.67 5000 310 ~0 985.27 $ ~O~t&7 5100 341 31 1059,00 5 545,69 5645 5273, 5200 372 31 1133,00 S 587,98 W 5775 5373, 5300 402 30 1206,2~ S 628,8~ W 5906 · 6037 6168 6299 6429 5473. 5400 433 31 __1280,_2_3 .~__:___6_.6~,87 W 5573. 5500 464 31 1353.82 S 711.,~2 W 5~.7~ ...... 5600 ...... ~_~ ............................ ~ ............ !~.Z,2~__.~ __Z~.~_,_7 ~w 5773, 5700 526 31 1500~37 S 79.5~_~4 W 5873. 5800 556 30 1572.21 $ 836.~5 W ..... 6558 5973, 5900 584 28 1643,40 S 875,91 W 6688 6073. 6000 615 31 6818 6173, 6100 645 30 1790.82 S 95~+.70 W 6950 6273, 6200 676 31 1865,41 S 994.89 W 7082 6373.--6300 709 33 1942,35 S 1035.27 W 7212 6473. 6400 739 30 2016,02 7341 6573. 6500 768 29 2088,55 S !!.1._~.~52 W 7469 6673. 6600 796 28 2160.41S 1147.22 W 7597 6773, 6700 824 28 2231,46 S .l_l~l.~_6_.W . 7723 6873, 6800 850 26 2300,46 S__12J~93 W 7848 6973, 6900 875 25 2367,96 S L2~Tie.__~W _ 7972 7073, 7000 899 24 2434,20 S ~uO_.~O W ARCO DS 1-13 MEASURED DEPTH AND OTHER H A.~._N_._E..T_.!_Q_ ~_~_b_T_~._5_HLO T, 5 UR V E Y ...................... DE,_C,_30_L_1917. _ DATA FOR EVE.R._Y___E. VE~ ....... !.00 FEET OF SUB SE_A DE~.TH, TRUE ' MEASURED VERTICAL SUB' MD-TVD VERTICAL DEPTH DEPTH SEA DIFFERENCE CORRECT[ON TOTAL C O_ Q_f'g_ D_[_N_A IE_$ 8096 7173, 7100 923 24 2499,50 S 8219 7273, 7200 946 23 2563,95 S 1346,22 W 8343 7373, 7300 970 24 8465 7473, 7400 992 22 8587 7573, 7500 1014 22 8709 7673, 7600 1036 22 8830 7773, 7700 1057 21 ~ 2875,44 S 1506,05 W 8950 7873, 7800 . 1077 20 2934,36 5 1.~...,_.18 W 9070 7973, 7900 1097 20 2990.9~ S 1571,52 W 9188 8073, 8000 1115 18 30~4,44 $ 1~03,75 W 9305 8173, 8100 1132 __17, 3095,83 S 9 ~ 21 8273, 8200 ,'114 @ 16 3 .!A&._7_2_5 ........ 1_6_7 O.,. 2_O__W. __ 9537 8373, 8300 116~ 16 3191,07 S 1705,78 W 9652 8~73, 8400 1179 9768 8573, 8500 1195 9883 8673, 8600 1210 15 32~5.43 $ __.1_7_~2,_~..5 W 15 3321,68 S .... !8_19,_11 W 9999 87'73, 8700 1226 16 3_3_6_~.,~1 5 _18.~.1.,.~! W 10115 8873, 8800 1242 16 3~09,~._5_ ...... ~8~.~1 W 10230 8973~ 8900 1257 15 3453,93 S__.C..JR_3~_.i~ W 3498,k6_~ 1971,8.5 10346 9073, 9000 ....._1.273 16 W 10463 9173, 9100 1290 17 W 10579 9273. 920_0 ....1306 16 3590.9_2_S ..... 20_~6_: 31 .... W 10695 9373, 9300 1322 16 3633_e_I_5_ S ......2..0_8_0.._m_Q.8_R' A ~ C 0 D_$_ -.J._~ HOT ~4TERPOL. ATED VALUES FOR EVEN 1000 FEET OF MEASURED DEPTH. TRUE MEASURED VERTICAL SUB DEPTH DEPTH SEA TOTAL COORD 1:NATES 1000 1000. 9~7. 0.00 S 0.00 W 2000 2000. 1927. 0.00 $ 0.00 W 3000 2998. 2925. 20,41 S 3.77 E 4000 3948. 3875. 289,94 S 104.98 W 5000 ~775, 4702. 775.04 S 388.00 W 6000 554a. 5471. 1333.i2 S S99,97 W 7000' 6310. 6237. 1895.28 S 1010.24 W 8000 7095. 7022. 2~49,01 $ ~1287,70 W 9000 7914. 7841, 2958,28 S 1552.07 W 10000 8773. 8700, 3365,99 S 1857,70 W ........................................................... HORIZONTAE.:'V IEW $C~AL E 1"'=500" · . ATLANTIC RICHFIELD CO. ~ ............DRILL SITE I,- I$ .......... ~ i~ .......... ~ RADIUS OF CURVATURE ~ _ - MAGNETIC MULTI-SHOT ._ ,' ; ..... [ '2800 ....... ~t ~ ~.00 · ~ - i . ~ $$00 4000 4400 4800 52oo : ALL DEPTHS SHOWN ARE T.V D ' · 400 800 _ . I~OO 1600:- .......................................... VERTICAL SECTION -- · SCALE ~ i''= I000' " ~ -- ATLANTIC RICHFIELD CO. DRILL-SITE--- I - ' 13, .............. ~ RADIUS OF CURVATURE '" I ' ' ~ MAGNETIC MULTI-SHOT _ ] ' .... i _':_' ' ..... 2400 - : -- · -' - ~800 .... : · 3600 - ....... ':~L_-i ...... :_ i._' I / ..................... 4ooo - . -~ .... .......... ; .......... ~ .......... ~ --- I ..... '- , · ' 4400 ' { .................................. ' - - 480( .... 5200 ..... . - - .- i ' ; .............. " - '{ ..... ~ ..... i ........... ~ ..... · ..... 1 ...... ~ ' ' ~ ' '.,~--- ........6000 4PL~iON REPORT .ANTIC RICHFIELD C934PANY ~OSCOPIC SURVEY ~ · )IUS OF CURVATURE METHOD OF COMPUTATION 4PUTED FOR SDC BY F M LINDSEY AND ASSOCIATES JAN 4t 1978 WELL.DS 1-13 DECLINATION 31 DEGREES EAST K B ELEV, 73 FT RECORD OF SURVEY ALL CALCULATIONS PERFORMED BY I B M ELECTRONIC COMPUTER TRUE ~,SJ DRIFT VERTICAL DTH ANGLE DEPTH D H SUB DRIFT SEA DiREC DEG. 0 0 0 0.00 100 0 0 100.00 200 0 0 200,00 BO0 0 0 300,00 ~00 0 0 400,00 500 0 0 500.00 500 0 0 600.00 700 0 0 700,00 BOO 0 i0 799,99 900 0 20 899,99 DO0 0 40 999,99 '73,00 .N16,00W 27,00 N16eOOW 127,00 N16eOOW 227,00 N16eOOW 327,00 N16,00W 427,00 N16,00W 527,00 N16,00W 627,00 N16,OOW 726,99 N16,00W 826,99 N 2,00E 926.99 N76,OOE 100 0 40 1099.98 1026,98 N77.00E 200 0 30 1199,98 1126,98 S61,ooE 300 0 30 1299,97 1226,97 S78,00E ~00 0 20 1399.97 1326,97 N89.00E 500 0 10 1499.97 1426.97 N63,OOE 6.00 0 20 1599.97 1526.97 N71mOOE 700 0 20 1699.97 1626,97 S 6.005 800 0 15 1799.97 1726.97 $76.00E 900 0 20 1899.96 1826,96 N71,OOE OOO 0 30 1999.96 1926,96 S89,00E 100 0 30 2099,96 2026.96 S66,00E 200 0 30 2199,95 2126,95 S73eOOE 300 0 30 2299.95 2226,95 SSgeOOE 400 0 30 2399.95 2326.95 SSI.OOE TOTAL COORDINATES CLOSURES DISTANCE ANGLE D M S O0 S 0,00 W O0 S 0.00 W O0 S 0,00 W O0 S 0.00 W 0 0 O, 0,14 N 0,58 N 1.22 N 1,49 N 1,35 N 1,05 N 0.98 N 1.08 N 1.26 N 0,98 N 0.61 N 0,64 N 0.75 N 0,56 N 0,26 N 0.12 N 0,04 N 0,04 W 0,09 W 0,42 E 1,55 E 2.54 E 3,36 E 4.09 E 4.51 E 5.36 E 5,68 E 6.18 E 6.90 E 7.75 E 8.57 E 9,43 E 10,29 E 0,00 & 0 0 0 W 0,00 $, 0 0 0 W 0,00 S 0 0 0 W 0,00. $ 0 0 0 W 0,00 $ 0 0 0 W 0,00 $ 0 0 0 W 0.00 S 0 0 0 W 0,00 S 0 0 0 W 0,14 N 15 59 59 W 0.59 N 9 15 1~, W 1.29 N 19 4 0 E 2,15 N 46 13 18 E 2,88 N 61 59 3~ E 3.52 N 72 38 .~e. f 4,20 N 76 31 15 E 4,64 N 76 28 17 E 5,08 N 75 38 49 E 5,~5 N 79 36 40 E 5,71 N 83 47 13 E 6,22 N 84 ~ 23 E 6.94 N 83 45 .56 E 7.77 N 85 49 3 E 8.57 N' 88 15 6 E 9,4~ N 89 lA 14 E 10.29 N 89 43 27 E DOG LEG SEVERITY DEG/IOOFT 0.000 0.000 0,000 0.000 0,000 0,000 0,000 0.170 0.170 0.330 0.012 0,170 0,148 0.160 0,170 0,t70 0,~32 0,090 0,090 0J160 0,199 0.061 0,139 0.070 SECTIL ') DISTANCE 0,00 0,00 0,00 0,00 0,00 0,00 0.00 0,00 =0,10 -0.45 -1.26 -2.07 '2.6u -2.90 -3.57 -3.55 -3.39 -3.67 -4,13 -4,39 -4.54 '4,86 '5,23 ARCO DS i-13 GYROSCOPIC SURVEY JAN 4~ 1978 RECORD OF SURVEY ALL CALCULATIONS PERFORMED BY I B M ELECTRONIC COMPUTER TRUE MEAS, DRIFT VERTICAL DEPTH ANGLE DEPTH D M SUB DR ! FT SEA DIREC DEG. 2500 0 30 2499.94 2426.94 STO.OOE 2600 0 30 2599,9.4 2526,94 $65.002 2700 0 45 2699193 2626,93 $48.002 2800 3 0 2799.87 2726,87 531.002 2900 5 15 2899,6[ 2826,61 515.002 3000 7 30 2998e98 2925,98 $15,00W 3100 8 45 3097,98 302~,98 $[6.00W 3200 10 30 ~96,57 ~1~3e57 S[I.00W 3300 12 45 ~94,5~ ~221,51 $21.OOW 3400 14 15 3391,7~ 3318,7.4 $23,00W 3500 Z6 0 3488'27 34~5,~7 $26,00W 3600 18 15 3583,83 35$0,83 $~7,00W 3700 22 0 3677,7[ 3604,71 $27.50W 3800 24 15 3769.67 3696.67 SZS,50W 3900 25 45 3860,30 37a7,30 529,00W 4000 28 15 3949e39 3876,39 S29,50W alO0 31 0 4036,3! 3963,31 $30.00W 4200 33 0 4121,11 ~048,11 S33,00W 4300 35 ~5 4203,64 ~130,64 S34.00W ~00 35 30 4284,93 4~11,93 S33,00W 4500 35 0 ~366.59 ~293,59 S32,00W a600 34 30 4448,75 4375,75 S3~.OCW ~700 35 0 4530,92 4457.92 S31,OOW 4800 36 15 4612,20 ~539,20 530,00W 4900 37 0 4692.46 4619,46 S30.OOW 5000 37 30 4772.06 4699.06 529.50W 5~00 38 45 4850.72 4777.7~ $29.50W 5200 39 15 492~.44 4855.4~ 530.00W 5300 39 30 5005,74 4932.74 529.50W TOTAL COORDINATES CLOSURES DISTANCE ANGLE D M 5 0.16 0,50 1,10 3.61 10.21 21,~16 50i~93 70;27 115,'6 11.14 E 11.94 E 12.85 E 14,92 E 17,72 E 17,44 E 9,40 E 3,86 E 11,14 5 89 7 58 E 11.95 5 87 35 31 E 12,90 5 85 5 55 E 15.36 5 76 22 40 E ~0,46 S 60 2 46 E 27,42 $ 39 29 43 E 37,14 5 20 59 56 E 51,79 5 10 28 2 E 70,38 S 3 8 45 E 92,04 5 3 2 24 W 116,71 5 7 43 50 W 144.90 5 11 28 45 W 172,58 s~;:':~ 44j58:,::w ~: 178,25 5 14 29 9 W 207,26 5 63.02 W 244,31 5 83,35 W 283.92 S 105.53 W 326.83 $ 130,06 W 372,01 5 157.74 W ~19.08 S 188e90 W 467,65 S 221,05 W 516.33 5 252.06 W 564,67 5 282.26 W 613,27 ~ 31~,0~ W 663.~5 5 341.61W 7~5.12 5 371,~3 W- 767.67 S 401,47 W 82~,40 5 ~31,87 W 876.0~ 5 ~53,10 W 93~,~2 5 494,58 W 216.63 S 16 54 49 W 258,14 S 18 50 17 W 302.90 S 20 23 24 W 351,76 5 21 41 58 W 404.07 5 22 58 42 W 459e69 $ 2~ 15 48 W 517,26 5 25 17 56 W 574.57 S 26 1 13 W 631,29 5 26 33 3~ W 688,09 5 26 58 5 W 746,23 5 27 ~4 37 W 805.83 5 27 26 51W 866.31S 27 36 30 W 928,02 5 27 ~4 3 W 990,9~ 5 27 51 4~ W Z054,32 5 27 58 33 W DOG LEG SEVERITY DEG/IOOFT 0'096 0'044 0'250 2'250 2'254 2,319 1'251 1,758 2,302 1,765 2,252 3,751 2,256 1,503 2,503 2,753 2,189 2,771 0,420 0,599 0.500 0.599 1,298 0,750 0.533 ~.250 0.539 0,322 SECTION DISTANt ,5~ -0,11 9,42 23,2~ 39,2z 58,72 81,8~ 107,8( 137,1~ 171,5~ 210,7~ 253,0; 298,4; 347,8~ ~72.9~ 629.9' 686,91 745.21 927.11 990,0~ 1053,4; ARCO DS 1-!3 GYROSCOPIC SURVEY JAN 4~ 1978 RECORD OF SURVEY ALL CALCULATIONS PERFORMED BY I B M ELECTRONIC COMPUTER TRUE MEA$. DRIFT VERTICAL DEPTH ANGLE DEPTH D M SUB DR I F T .SEA D]REC DEG. TOTAL COORDINATES CLOSURES DISTANCE ANGEE D M S 5400 39 45 5082,76 5009,76 $29,00W 986.76 5500 40 15 5159,36 5086.36 $28.50W 1043,11 5600 40 30 5235.55 5162.55 $29.00W 1099.91 5700 41 15 5311,16 5238.16 szg.50W 1157,00 5800 40 ~5 5~86.63 5313.63 $29.00W 1214,24 5900 40 25 5462,57 §~9,57 szg.00W 1271~,15 6000 40 0 5538,93 ~465,93 $29.00W 1327~62 6~00 39 40 56~5.72 5542.72 S28.50W 1383~78 6200 39 15 5692,93 5619.93 $ZS,00W 1439'i77 6300 39 15 5770,37 5697.37 S28.00W 1495 6400 39 0 5~47.~4 5774,94 S29.00W 1551 525,74 W 556.66 W 587.81 W 619.79 W 651.85 W 683,39 W 714,69 W 745.50 W 775,58 W 1118.08 S 28 2 54 W 1182.35 S 28 5 11W 1247.13 $ 28 7 16 W 1312.56 S 28 10 38 W 1378.15 $ 28 13 42 W 1~3,21 $ 28 15 47 W 1507.77 S 28 17 41W 1571.83 $ 28 18 48 W 1635,38 S 28 18 39 W 1698,65 $ 28 17 57 W 1761.75 $ 28 18 23 W 6500 39 0 5925,66 5852,66 $28.50W 1606':2~ 6600 38 45 600~,51 5930,51 S28.00W 1661.55 6800 38 30 6159.62 6086.62 $29.00W 1771.67 S 954,54 W 6900 38 35 6237,84 616~.84 S29.50W 1826.04 $ 98~.99 W 7000 38 30 6~6,0~ 62~3,05 $25.00W 1880.66 $ 1014.96 W 7100 38 30 63~4e3! 6321.31 $28.00W 1935.63 S 1044,19 W 7200 38 20 6~72,66 6399,66 SES.00W 1990.50 $ 1073.36 W 7300 3~ ~5 655lc!& 6478.14 S29.00W 2044.96 S 1102.93 W 7400 38 0 6629,81 6556.81 528.00W 2099.21 S 1132.39 W 7500 37 45 6708.74 6635,74 $27.00W 2153,67 $ ~160.74 W 7600 37 30 &787,9~ 6714.94 &ZT,00W 2208.07 S 1188.45 W 7700 37 15 6867,41 6794,~ S26.50W 2262.27 S 1215.77 W 7800 96 45 69~7,27 6874,27 S27.00W 2316.01 $ 1242.86 W 7900 37 0 7027.27 695~.27 S26.50W 2369.60 S 1269,87 W 8000 36 30 7107.39 7034.39 $26,50W 2423.14 S 1296.57 W 8100 36 15 7187.91 7114.91 S27.00W 2476.10 $ 1323.26 W 8200 36 0 72~8.68 7195,68 SZ7.00W 2528.63 $ 1350.03 W 1824.68 S 28 19 18 W 1887,44 S 28 19 9 W 1950,03 S 28 18 32 W 2012,45 S 28 18 54 W 2074.76 S 28 20 35 ~ 2137,07 $ 28 21 18 W 2199,32 S 28 20 41 W 2261.46 S 28 20 7 W 2323,43 S 28 20 2~ W 2385.17 $ 28 20 }8 W 2446.55 S 28 ~9 22 W 2507.59 $ 28 17 26 W 2568.27 S 28 15 15 W 2628.43 S 28 13 11W 2688.41 S 2~ 11 13 W 2748,22 S 28 9 0 W 2~07.51 S 28 7 14 W 2~66.45 S 28 5 51W DOG LEG SEVERITY DEG/IOOFT 0,323 0.542 0,327 0.781 0,543 0,320 0,430 0,388 0,000 0.468 0,315 0,318 O,O00 0,461 0.214 0,588 0,000 0.160 0,394 0.45~+ 0.451 0.250 0.310 0.531 0.309 0.500 0,305 0.250 SECT ION DISTANC 1117.2~ 11 ~50 1~11.68 1377,28 1~2,33 1506.88 1570,91 1697.65 1760.72 1823.63 1886,35 1948.89 2011,29 2073.~9 2135.88 22~,17 2322,12 2383,82 2~45.1~ 2506.0~ 2566.6~ 2626,7~ 2686.6~ 27~6,3~ 2805,5~ 286½.4¢ ARCO DS 1-13 GYROSCOP!C SURVEY JAN 4~ [978 RECORD OF SURVEY ALL CALCULATIONS PERFORMED BY ! B M ELECTRONIC COMPUTER TRUE MEAS. DRIFT VERTIEAL, DEPTH ANGLE DEPTH D M SUB DR I F T SEA DIREC DEG. TOTAL COORDINATES CLOSURES DISTANCE ANGLE D M S 8300 35 30 7349.84 7276.84 527,50W 2580,57 S 1376,78 W 8400 35 0 7431.90 7358e50 $27,00W 2631,88 S 1403.20 W 8500 34 45 75[3e54 7440e54 $27,50W 2682,71S 1429,38 W 8600 3& 15 759§e96 7522,96 $27,50W 2732,95 $ 1455,54 W 8700 3~ 49 7678.86 ?605,86 S28,50W 2782.93 S 1481,79 W 8800 33 20 ?762,2.0 7689,20 S30,OOW 2830 54 $ 1508,79 W 8900 32 0 7846,38 7773.38 S30,50W 287 17 S 1535,98 W 9000 31 35 7931098 7898.38 $32.00W 2922~21S 1563.32 W 9100 31 0 801&.89 7943,83 $92,90W 2966914 S 159i,03 W 9200 30 40 8102.~9 ~029.69 S34,00W 3009'00'S '~ 1619,1 9~00 30 20 8188,8~ 8115,85 $35,00W 3050,84',S~1 2924,87 S 28 4 50 W 2982,58 S 28 3 52 W 3039,75 S 28 2 57 W 3096.39 S 28 2 21W 3152,31S 28 2 18 W 3207.56 S 28 3 33 W 3261.50 S 28 5 44 W 3314,10 $ 28 8 44 W 3365,9Z $ 28 12 32 W 3416,98 S 28 17 4 W 9400 29 95 8275,3~ 8202.33 $95.50W 3091'84:'S..~:~1676'86'~.'w 3517,29 S 28 28 23 W 9500 29 35 8362.14 8289.14 S~6.00W 3132.12. S,-': 1705.86:'W~,:,~:', 3566.53 S 28 3~ 27 W 9600 29 15 8~49,25 8376,25 S~6,00W 3171.86 S 1734,74 W 3615,25 S 28 40 29 W 9700 29 0 89~6~&0 8463,60 S37,OOW 3210.98 S 1763.69 W 9800 29 15 8623,96 8550,96 S38.OOW 3249,60 S 1793.31W 9900 30 15 8710e78 ~637,78 $40.00W 3288.16 S 1824.54 W 10000 30 45 8796,g4 8723,94 $40.50W 3326,90 S 1857,33 W 10100 29 30 8883,43 8810,43 $40,00W 9365.20 S 1889,76 W 10200 30 30 8970003 8897,03 541,00W 3403,22 S 1922.23 W 10300 31 30 9059e79 8982e75 S42.00W 3441,79 S 1956.36 W 10400 ~1 0 9141.24 9068.24 S42.50W ~480.19 S 1991.24 W 10500 31 15 9226,84 9193,84 S42eOOW 3518,45 S 2025,99 W 10567 31 0 9369,80 9296,80 S41.00W 9583.11 $ 2083.19 W 107~0 31 0 9432.9~ 9399138 S~O,OOW 3611.70 S 2107.61W 3663,47 S 28 46 42 W 3711.59 S 28 53 32 W 3760.45 $ 29 1 30 W 3810.24 S 29 10 25 W 3859.51 S 29 19 0 W 3908,57 S 29 27 32 W 3958,95 S ~9 36 52 W ~009,59 S 29 46 35 W ~060.07 S 29 56 3 W 4144.68 S 30 ~0 24 W 4181,67 $ 30 15 56 W DOG LEG SEVERITY DEG/IOOFT 0,528 0.526 0.298 0,500 0,588 0,611 1,347 0,581 0,605 0.511 0,417 0.428 '0,361 0.340 0,343 0.346 1.121 0,517 1.256 1.033 1,037 0.517 0.284 0,218 0,706 SECTION DISTANC! 2922.75 30~ 48 3094,05 3149,93 3205,18 3259,16 3311.83 3363,75 3414,93 3465.56 3515,57 3564,98 3613,85 3662.24 3710,52 3759.56 3908,18 4144.67 4181.67 BOTTOM HOLE CLOSURE 4181.67 FEET AT S 30 15 56 W - Eeo D5'!-13 GYROSCOPIC SURVEY ~ JAN /+, 1978 INTERPOLATED TRUE VERTICAL DEPTHS~ COORDINATES AND CLOSURES FOR GIVEN DEPTHS TRUE ODE HEA,SURED VERTICAL TOTAL COORDINATES C L 0 $ U R E SUB AlVlE DEP:TH DEPTH D iS TANCE ANGLE SEA D M S OP SAD. 9975 8775,~ 3917.26 S 18~+8.96 W ASE SAD 10636 93~+3.2~+ 3571'07 S 2072.69 W 3797.75 S 29 8 3 W 8702.~4 4128.99 S 30 7 53 W 9270.2~ 'ARCO'DS 1-13 GYROSCOPIC SUR'VEY MEASURED DEPTH AND OTHER DATA FOR EVERY EVEN 100 FEET OF ,SUB SEA DEPTH. JAN 4~ 1978 TRUE HEASURED VERTICAL SUB MD~TVD VERTICAL DEPTH DEPTH SEA DIFFERENCE CORRECTION TOTAL COORDINATES [73 173. 100 0 273 273. 200 0 373 373. 300 0 473 473e 400 0 5?3 573e 500 0 673 673e 600 0 773 773e 700 0 873 873e 800 0 973 973e 900 0 1073 1073e 1000 0 1173 1173e 1100 0 1273 1273. 1200 0 1373 1373. 1300 0 !473 I473e 1400 0 1573 1~73e 1500 0 1673 1673. 1600 0 1773 1773e 1700 0 1873 1873. 1800 0 1973 1973e 1900 2073 2073e 2000 0 2173 2173e 2100 0 22?3 2273. 2200 0 2373 2373e 2300 0 2473 2473. 2400 0 2573 2573e 2500 0 2673 2673e 2600 0 2773 2773e 2700 0 2873 2873e 2800 0 2974 2973e 2900 0 3075 3073e 3000 3176 3173e 3100 3 3278 3273. 3200 3381 3373. 3300 7 3484 3473e 3400 11 3589 3573. 3500 15 0.00 S 0.00 S 0.00 S 0,00 5 0.00 S 0.00 S 0,07 N 0,42 N 1.07 N 1.42 N 1,46 N 1,lO N 1 · 20 N 0.66 N 0.60 N 0,74 N 0.65 N 0.33 N 0.13 N 0.08 N 0.09 $ 0.40 $ 0.89 5 2.59 S 8.01 $ 17.96 S 31,05 5 46.73 S 65.78 S 87.57 S 111,71 5 138.84 S 0.00 W 0.00 W 0,00 W 0.00 W 0.00 W 0.00 W 0.02 W 0.08 W 0.17 E 1.24 E 2.32 E 3.13 E 3.91 E 4.42 E 4.78 E 5.30 E 5.55 E 6.03 E 6,67 E 7e53 E 8,34 E 9.19 E 10.06 E 10e91 E 11e73 E 12.59 E 14,18 E 16.99 E 18.11E 14.37 E 10,28 E 5,45 E 3.05 W 13.80 W 27,23 W ARCO 'DS 1-!3 GYROSCOPIC SURVEY MEASURED DEPTH AND OTHER DATA FOR EVERY EVEN 100 FEET OF SUB SEA DEPTH. JAN /+, 1978 TRUE MEASURED VERTICAL SUB ND-TVD VERTICAL DEPTH DEPTH SEA DIFFERENCE CORRECTION TOTAL COORDZNATES 3695 3673. 3600 21 3804 3'773, 3700 30 391~+ 3873~ 3800 ~027 3.973. 3900 53 ~1/+3 ~073. 4000 69 e~62 ~73e ~00 89 ~385 ~273e ~200 112 ~508 4373e ~300 135 ~629 ~3~ ~00 [56 4751 ~S?3e 4500 178 ~876 k673e ~600 202 500~ ~?3e k?O0 228 5257 ~97~e 4900 28k 5387 5073. 5000 5518 5~73e 5!00 3~ 56~9 5273e 5200 376 5782 5373, 5300 ~09 591~ 5~73, 5~00 60~ ~573, 5500 617~ 5673e 5600 501 6303 5773. 5700 530 6~32 ~873e 5800 559 6561 5973, 5900 588 6689 6073e 6000 616 6817 6173e 6100 6~ 69~5 6273. 6200 672 7073 6~73e 6300 TO0 T200 6,7~e 6~00 7328 6~73. 6500 755 7655 667~e 6600 782 758~ 677~e 6700 808 7707 6873e 6800 83~ 7832 6973e 6900 859 7957 7073, 7000 88~ 6 9 11 12 16 2O 23 23 21 22 2/+ 26 32 33 32 3O 30 29 29 29 28 28 28 28 27 28 27 26 26 25 25 170.97 208.58 249.66 295,21 346.12 400,87 /+60.35 520.13 578..6/+ 638.61 702.46 907.41 979.63 1127~85 la0~09 1~78~91 1352,37 1~25~35 1~97e3~ 1568e73 ~6eO.O1 1710~73 1780e92 t850.61 1920.66 1990 ~ 50 2060.03 2129.01 2~97e75 2266.08 2333~11 2~00e33 /+3.59 63.73 86.32 111.83 1/+1.49 176.71 216,29 25/+,/+3 290,95 327.12 36/+.13 401.76 .81.00 52i.~7 562.09 603.30 645.89 687.69 728.29 767.61 806.18 8/+5.11 883.61 921.53 959.67 998.~8 1036.23 1073.36 1111.2~ 1148.05 1183.20 1217.6~ 1251.51 1284.86 'ARCO'DS 1-].3 GYROSCOPIC SURYEY MEASURED DEPTH AND OTHER DATA FOR EVERY EVEN 100 FEET OF SUB SEA DEPTH, JAN ~+t ].978 TRUE HEASURED VERTICAL SUB HD.~TVD VERTICAL DEPTH DEPTH SEA DIFFERENCE CORRECTION TOTAL COORDINATES 8081 7173e 7100 908 8205 7273e 7200 932 8328 7373. 7300 955 845[ 747~e 7400 978 8572 7~7~e 7500 999 8693 7673e 7600 ~020 8813 777~ 7700 ~0~0 8931 78730 7800 1058 90~9 7973. 7900 X076 9~65 8073. 8000 ~092 9282 ~73. B~O0 ~09 9397 B273~ 8200 ~2~ 9~12 837~. 8300 1139 9627 ~73e 8~00 115~ 97~2 8~7~e 8500 1~68 98~6 867~e 8600 9972 BTT3e 8700 1199 ~OOB8 8BT3e 8800 t0~03 B973~ 8900 ~0320 90T3e 9000 ~2~? 10437 917~e 9100 1264 X0~54 9273e 9200 1281 10671 9373e 9300 1298 24 2~66 · [ 9 24 2531,25 23 2595,03 23 2657,71 21 2719.].1 21 2779.09 20 2836.67 18 2891.32 18 29~+3,79 16 2994.2~ 17 ,~ 15 3090.7a 5 ..... ~ 3 91 7 ~ · ~ e 16 3316.09 $ 16 3360,80 S 15 3104.37 S 17 3~9.55 $ ].? 3494.3? S 17 17 1317,95 W 1351,36 W 1384.15 W 1416.36 W 1447,93 W 1~79.52 W 1512,33 W 15~.26 W 1576,80 W 1609,04 W 1642.57 W 1675,82 W 1709,3~ W 1742,51W 1775.91W 1847,98 W 1885.79 W 192~,23 W 1963.34 W 2004.01W 3539.29 $ 2044.65 W 358~.55 $ 2084.45 W ARCO GYROSCOP XC SURVEY NTERPOLATED VALUES FOE EVEN [000 FEET OF MEASURED DEPTH, ?RUE HEASUEED VERT [ CAL SUES DEPTH DEPTH .SEA TOTAL COORDINATES lO00 999, 926, 2000 ~999, 1926, 3000 2998e 2925, ~OOO 3949, 3876, 5000 ~772, ~699, 600'0 55~8, 5~65, ?000 6316, 62~3, 8000 7107, 703~e 9000 7931, 7858, ~0000 e796, 8723, 1.21 N 0.41 E 0,75 N 6,90 E 21,16 $ 17,4~+ E 284,01 S 105,36 W 767,80 .S ~+01,2~+ W 1327,61 S 71~.,69 iN ],880,79 S 1014e72 W 2~23,37 5 1296.10 W 2922,32 S 1563.12 W 3327.~g~ S 1857.16 W dAN ~+~ 1978 HORIZONTAL VIEW SCALE I" = I000 ATLANTIC RICHFIELD COMPANY DRILL SITE I-1:5 RADIUS OF CURVATURE GYROSCOPIC SURVEY $60O 5200 5600 6000 '6400 7200 T'V D = 9:,432? TMD = !0,740' I,ARE TVD. ............................................................................................. VERTICAL~ SECTION SCALE I"=1000~ 400, ATLANTIC RICHFIELD COMPANY .................................................................... DRILL SITE 1-13 RADIUS OF CURVATURE 80o. GYROSCOPIC SURVEY 1200- 1600- · . . . 2400- i , ALL DEPTHS SHOWN ARE TVD. __ TVD -- 9~4.~2' TMD "10~740' LOCATED IN THE APPENDIX WFL IPR LOG CALIPER SURVEY VOLAN URVE DATA [~ STRATIGRAPHIC HIGH RESOLUTION DIPMETER OTHER: AtlanficRichfieldCompany North Arnerk~ Producing Division North Alaska Jtdct Post Office Bo× 360 Ar~chorage, A~aska 99510 Telephone 907 277 5637 January 5, 1978 Mr. Hoyle H. Hamilton State of Alaska Department of Natural Resources Division of Oil and Gas 3001 Porcupine Drive Anchorage, Alaska 99501 Subject: DS 1-13 (xx-7-10-15) Permit No. 77-59 Dear Mr. Hamilton: Enclosed please £ind the Monthly Report of Drilling Operations for the above-mentioned well. Very truly yours, Frank M. Brown District Drilling Engineer /am EnclOsures Form ~o. R.1L'V ~ ~,- l- 70 STATE OF ALASKA OIL AND GAS CONSERVATION COMMITTEE /~ONTHLy REPORT OF DRILLING AND WORKOVER OPERATIONS WELL wELL ~.NAA~EOFOP~TOR Atlantic Richfield Company 'P.O. Box 360; Anchorage, Alaska 99510 4. LOCA~ON OF WFJuL 662'S & 733'E of 1~ cr Sec. 8, T10N, R15E, UH APl N~{ERICAL CODE 50-029-20270 6 LEASE DESIGNATION AND SERIAL NO, ADL 28329 ? tF INDIA)~, ALOT1-EE OR TRIBE NAME 8. L,~IT FPdqA{ OR LEASE NAME prudhoe Bay, Unit 9 WELL NO DS 1-13 (xx-7-10-15) 10 FIEL,D A-ND POOL. OR WILDCAT Prudhoe Bay Field ._ Prndboe 0~.1 Pool II. SEC., T., R., M.. (BOTT°M om.mc~-zv'~ Sec. 7, T10N, R15E, UM 1~. PE1R.MIT NO. 77-59 13.R. EI~ORT TOTAL DKI:~I'H AT E~D OF BiO'NTH. CHA..\'GF.S I~ HOLE SIZE. CASING AN~ C~TING JOBS INCLUDING D~TH SET A~ VOL~ US~, P~O~TIONS. ~TS ~%~ ~5UL~ FISHING JO~ J~K LN HO~ ~ND SIDE-~CKED HOLE ~ND ~Y O~R SIGNIFIC~T ~G~ ~ HO~ CONDITIONS ~eport of Monthly Operations for December, 1977 Spudded well @ 1330 hrs 12/5/77. Drld 17-1/2" to 2750'. RU & ran 68 jts 13-3/8" 72# N-80 Butt csg w/shoe @ 2725'. Cmtd w/5500 sx Permafrost II, 14.8 ppg. Drld FC, float shoe & 10' new form. Tstd to 11.6 ppg equiv. Drld 12-1/4" hole to 10,667'. Dropped multishot. Ran DIL/SP, BHC/Sonia/GR, CNL/FDC/CAL/GR. Drld to 10,760'. RU & ran 9-5/8" 47# csg w/shoe @ 10,735', FC @ 10,691', lower FO @ 2457', upper FO @ 2334'. Cmtd w/1000 sx Class G cmt, 15.8 ppg. Opened, circ thru, then closed & tstd upper FO. Opened & circ thru lower FO. Sqz 300 sx Permafrost cmt thru lower FO. Closed & tstd. Did Arctic Pack job. Displ mud w/wtr. Ran gyro survey. Ran CNL/GR/CCL, CBL/VDL/CCL. Ran junk bskt & gauge ring. As of December 31, RU to run 5-1/2" tbg. ' ~~-~ District Drlg' 14' 1 hereby ~~ ~g°m ~N'm~ ,,~ . .. _ ~T~ Engin_ ree .... 1-5-78 l_i_ __ I I I . Lr i. ' il 11 ii , ' ~ ....... 111 , 11, __,l ill, NOTE--Report on t~is form i, required for e~ calendar ~th~ regardless of the ~tatus of operations, and must ~ flied In d~plicate with the otl and gas conservation ¢ommt~ee by the 15~ of the succoring ~n~, unle~ otherwise directed. DEP~ OF NATURAL RESOUI~2ES ,_.' Divi~~~~Oil~ ... ~ Gas Conservation O. K. Gilbreth, Dec~mber 20, 1977 Director Hoyle H. Hamilton _ -~~/ Chief Petrole~ Eng/nee~v' . Blc~0ut Preventer ~ui~t Test - Aroo's DS 1-13 Monday, ~ 5, 1977 - I departed my bxaze at 7:00 AM for a 7:30 AM ~ and 8:40 ~ departuz~ via Arco chartmr to Prudhoe Bay. Our delayed departure flight arrived at Arco's strip at 10:35 AM and I proceeded to drill site ~9 wher--------~e Bf~E tests w~re initiated at 8:30 PM. Tuesday, ~_ 6, 1977- ~BfH~ tests c~ DS 9-19 were concluded at 3:15 AM ~ I con~- ~ Allen at DS 1-13 where surface t~le was nearing comple~. ~sday, Dec~mber 7, 1977 - I arrived at DS 1-13 where 13 3/8" surface bi~'~ 'be~ run, Arco's drilling fore~an was Shorty Allen ar~ Rowan #35 tool~ was D. C. nipple and ~-five hour delay resulted. Friday, Deoemb~r_ ~. ~!.9 .~77 - Tests.began at 4:45 AM with 13 3/8" set at 2726'. ~ to 3000 psig. Leaks developed irarediately in the check valve in the kill line and ~ valve o~ the 9 5/8" casing head. While repairs w~e initiated, I checked annular pressure at 3000 psi. N2 backup bottles tested 1850, 1500, 2050, 2050, 2050 and 2100 psig. Upper pipe rams, both wing valves on the kf]l line, both wing valves on the ~9oke line and lower kelly valve tested to 5000 psig. ~ pipe rams, blind rams and 13 valves and 36 flanges in the choke manifold tested to 5000 psig. The manual adjustable choke %~s free moving and the Swaco supercbo~ actuated fully opened and fully closed. Both dart and ball type floor valves w~re on th~ floor. The kelly cock would not test and kelly w~s set back in the rathole for steaming. I returned to camp and asked to be notified when the kelly cock driller returned to camp a~ advised an accident ~had_ occurred on the rig floor. The swivel and kelly had blo%~ cut of the hole, unlatched frc~ the blocks, and draped itself over the wind wall. Only. the u-shape of the kelly and rotary hose kept it frc~ fal!~ng to the ground. Sub~t investigation DS 1-13 + Dec~zbe~ 20, 1977 ~~: (1) ~ ~ joint w~_s not made back up into the test plug; (2) ~ ~ ~ter ~ closed, and (3) ~he driller bad instruc59ms f~r a ~lac~t kelly and roe~y hose cn the slope. pit well built, rig in good ~ and ~ sign was up. A field inspe~cion report was prepared with the ~riginal given to Shorty Alle~, a ~ ~mail~ to Bob ~, a~d a copy attached to this report. I depa~d Aroo's ~ Bay strip via Arco charP_er at 1:05 PM, arrivin.~. in Anchorage at 2:30 ~ and at my hate at 3:10 PM. fI wi~ ~accessful BOPE tests on Arco's DS 1-13 with the ~ kelly cock and kill 1/ne check valve. These t~o items, retested due to a rig accident. I noted c~ the field inspection repo~ that ~ item~ ~ to be retested ar~ the r~alts called to our office by 12/16/77. .- Joe Mann, Arco's North Slope coc~xi~nator, sed both kelly cock and check valve had been ~ced ~accessfully to 5000 psig. At~t 'Ala ~ Oil and Gas Conservation Commit e ..... Field Inspection Report Drl.g. 'Permit No.,-?,:~, ~__~_~_-_,'~," -_ ~ ..... 4;__~ ~ ~;~: '¢~. ,.q. ~'~",~," Wel 1 / ~]:a,gfm Sec ~",, .T,A~, ;/ ...... R.:~/f~dg,g,~ M Operator ~,,,~ O~ Represented by ., . SaCJsfac¢ory Type Inspection SatJsfactory Type InspectJon Yes ~o Item (~,~}'~'kocat~on,fieneral Yes ~o Item (~1;~. ( ) ' (~- () (~)-( ) (~,() i..' ()() () () ,. () () () () () () () () 1. Well Sign 2. General Housekeeping ~. Reserve Pit-( )open( )filled 4. Rig ( ) Safety Valve Tests 5. Su~fface-No. Wells 6. Subsurface-No. Wells ( ) Well Test Data 7. Well Nos. , , , 8. Hrs. obser , , , 9. BS&W , , , 10. Gr. Bbls.- , , , ( ) Fina~andonment (~,,}" ( ) (,~,,) ...... ( ) (~)-, ( ) (~() (~() (m,' ( ) (~)~ ( ) (,~,~ ( ) ( () (~)~ ( ) (~() (.~ ( ) 1 5~. ?~'.',Casin.q set @ .:,?i ?i,,,,? 1~. 'Tes;c fluid-( )wtr.-----~ )mud · '~ psia 17. Master Hyd Control Sys.-,~.;~,~,,~ ,. 18 N2 btls~,.,,,~:..~,.,',~:,r:'.:,,::~,~'~sia ' "~, ~' ~ ,C~ 19. Remote Controls 20. Drilling spool- ,,::2 "outlets 21. Kill Li.ne-~}) Check valve 22. Choke Flowline ( ) HCR valve 23. Choke Manifold No. valvs.A~.,,~ flgs.~ 24. Chokes-(~>,)Remote( )Pos.(~,~dj. 26. TeSt PlUg-(~.~)'Wellhd( )csg( )none 26. Annular Preventer,'.:',~sia (~ ( ) 27. Blind Rams,,,:~?,psia ( ) ( ) 11. P&A Marker (~,~' ( ) 28. Pipe Rams ( ) ( ) 12. Water well-( )capped( )plugged ( ) (~) 29. Kelly & Kelly-cock .~, psig ( ) ( ) 13. Clean-up (~,~ ( ) 30. Lower Kelly valve,.~~si9 '.~ . ( ) ( ) 14. Pad leveled (), ( ) 31 Safety Floor valves-(~},B~ ?~'~otal inspection observation time ~' hrs/~ Total number leaks and/or equip, failures . ready~ Inspected days when or Sep~ 28., 1977 ~ ~ Unit ~ 1-13 ~7-10-15) Atlantic ~c~~ Comply ~~t No. 77-59 ~l~ntic Richfield ~ P. O. ~ 36O An~ac3e, ~ 99510 D~ar Sir: refers-need ~11 ~ a location in Section 7, To~.nship 10N, Raingo. 15E, U.M. ~H sa~91es, core cb/ps ar~ a mud log are not rec~~. A d/recti~ $~ is required. Many ri~mrs in ~ ~ ~ drainage ~ have been classified as important for ~-spa~m/ng or m~gratium of ~ fish. Operations ~ t/~ ~ ~ subject to AS 16.50.870 and the regulations px~m~gat~d thereunder (Title 5, $1aska ~istrative ~). Prior to ~cing operations ~ ~ be ~t~c~ed ~r ~ Habitat Cooke's office, Department of Fish -and Pollution of ~ ~ of the State is prohibited by AS 46, ~ 03, Article 7 ~ ~ regulations prcm~tlgated ~under (Title 18, Alaska ~istrati~ ODd~, Chapter 70) ~ by ~ Federal Water Pollution cc~tacbed ~ a representativ~ of the Depar~t of En~tal Cc~~a~. Pursuant to AS 38.40, ~ HJ~ ~ Sta~ Imases, the ~laska Department of Labor is beJmg notified of '~ i~~ of this ~m~mit to drill. To aid u~., ~ ~~ fie~ work, ~ ~ld a~pr~ciate your notifying this office within .8 hours after the ~11 is sI~xtded. We would also lik~ to be ~ied so tb~t a representative ~ the Divisicm my be present to witness te~ of bl~at pre~ equi~t he. fore surfac~ casing shoe is drilled. F. M. ~ ~ Bay ~t ~ 1-13 1977 In the ~t of ~_spens~ or abandonment please gi%~ this office adequate advanc~ r~tifica*_ic~ so t~t we may ~ a witness present. Very truly yours, Enc~ Department of Fish ar~ Gam~, ~mbitat Secti~ w/o ~cl. Depart~t of En~tal Co~serva~ w/o encl. Department of ~, Supervise, Labor Law Compliance Division w/o enct. Form 10-401 REV. 1-1-71. ' SUBMIT IN TR' %TE (Other iustruc, an reverse sid~ · STATE OF ALASKA OIL AND GAS CONSERVATION COMMITTEE PERMIT TO DRILL OR DEEPEN ~i?;'~ '~ ..... :-.~ .~,, ~ ~:~' :.,? SINGLE m .MULTIPLE OTHER ZONE , ~ ~}~ ZONE ~ la. TYPE OF WORK b. TYPE'OF V~qELL OIL ¥,~LL F~ DRILL [-~ GAS WELL U 2. NAME OF OPERATOR DEEPEN r--] · Atlantic Richfield Company ...... 3. ADDRESS OF OPERATOR P.0. Box 360; Anch0raqe, A1 aska 4, LOCATION OF ','FELL ~ "tsu~62',E'"& 733'E of NW ce Sec. 99510 8, T1ON, 'R15E, UM At propo~d pred..zone @8800'ss) 1370'N & 1250'W of SE cr Sec. 7, TION, R15E, UM 13. DISTANCE IN MILES AND DIRECTION FROM NEAREST TOWN OR POST OFFICE* Approximately 6 miles NE of Deadhorse 14. t{OND INFORMATION: API No. 50-029-20270 5. 6. LEASE DESIGNATION AND SERIAl. NO. ADL-28329 7. IF INDIAN, ALLOTTEE OR 'I'~HBE NAME 8. UNI]' FARM OR LEASE NAME Prudh0e Bay Unit 9.WEI.L NO. DS 1-13 (xx-7-10-lS) 10~t:IELElt\ND PO~L, OR vruonoe i~ay ~:~'~! Dv,,,,qhr~c~ FI..-; 1 Dr~l 11., s¥:~,'i., If.,. l., It 6i'Toh tIOLE OBJECTIVE) Sec. 7, T1ON, R15E, UM 12. ~*E Statewides~ty~,d/orNo. Federal Insurance Co. #8011-38-40 I.;. ~o. o~ ^c~s tN LEASE LOC^TION TO NEAREST 1370' ' Ii 2501 · -19. PROPOSED DEPTH · 9450 '..+TVD 15. DISTANCE FROM PROPOSED * PROPERTY OR LEASE LINE, FT. (Also to nearest drig, unit, it' any) 18. DISTANCE FROM PROPOSED LOCATION TO NEAREST WELL DRILLING, COMPLETED, OR APPLIED FOR, FT. 2350' Amount $1 00,000 I,. No,^c.E~ ASSIGNED TO THIS WE~ 60 2c). ROTARY OR CABLE TOOLS ' Rotary 21. · ELEVATIONS (Show whether DF~ RT, CR, etc.) 22. APPROX. DATE WORK WILL START 39.7' Pad Elevation (Gravel) 23~ PROPOSED CASING AND CEMENTING PROGRAM SiZE OF H01. E. SI'ZE OF' CASING "' WEIGHT PER FoOT GRADE S~T~ING DEPTH Quantity of .... ,ent -'~2" 20" "' 94 lb. H-40 144i'+MD 300sx'Permafrost II to'~urface" 17-----dj/'2" 13-3J8" '72'1b. MN-80 27.00'+-MD Circ to surface-.apProx 5500 sx. ~2~1/4" 9-5Z8'.'. 47 lb.. 8b & 95 . 10750.'+-MD 1500'+ cmt column on lst.sta~g_e (a ,. - .. lO00_s~) plus 300'+ column on_2lLd_ .......... I ..... sta.qe. (approx 300~x). . prox Atlantic Richfield Company proposes to directionally this well to 10750'+MD, .9450'+TVD to · produce the Sadlerochit zone. Logs· will be run across selected intervals.~ A 13-5/8;' 5000 psi Hydril and 13-5/8" 5000 psi pipe and blind rams will be used on the 13-3/8" casing. 'The BOP equipment will be pressure teSted each week and operationally tested each trip. A string of 5-1/2" 17# N-80 tubing, packer and necessary provisions for subsurface safety equipment will be run. The packer will be set above the Sadlerochit. A non-freezing liquid will be left in all uncemented.annuli within' the permafrost interval. Selected intervals within, the Sadlerochit interval will be perforated, and reported on subsequent report. A 5000 psi WP wireline lubricator, tested to working pressure, will be utilized with all wireline work. Well will be flowed to a surge tank. All recovered liquids will be trucked IN ABOVE SPACE DESCRIBE PROPOSED PROGRAM: If pr6posal, is to deepen give data on present produ,:tive zone and proposed new productive zone. If proposalis to drill or deePen directionally, ~ive pertinent data on subsurface locations and measured :,nd true vertical depths. Give blowout preventer program. ' ( C o n t. Re ve rs e S i de DATE .... , ~ (This space for State office use) [SAMPLES AND COR~ C. IPS REQU~D ELY'S ~ NO ' I~IRECTIONA'L SURVEY REQUIRED ~ YES ~ NO CONDITIONS OF APPROVAL, IF ANY: MUD LOG [] yES I~ ~o OTHER REQUIREMENTS: A.P.I. NUMERICAL CODE 50-029-20270 ?ERMIT NO. 77-59 APPROVAL DATE APPOVEDBY~;~~_~e'._..~ TITLE ..... .Chairfftan e Instruction On Reverse Side September 2,8, 1977 DATE gop~om__t3er 28~ 1977 SECT~©N ~ L. ,-',T //'~ LL. LAT_ W E L. LAT. t ..ON 7<)':' [ 4' ?" '* ' '"" ---J..,J,'.. ";'6 940 126.5t , 4 r,," ::,, '.. , · 0.655" Y,, F, 98 n88.31 70© 14' 27.09l" Y 5 940 24-5,77 I !,i;j° 2.4' 1.302" >' 67,"d ,.'),62.97 I ,40. I,q. i' /0© t4' 28.24:-,~ '/ 5 940.5S0,83 14a'""'" .'24' 1.947" X 698 O3'F. Tb V/ELL l'.lO. 15 L AT. 70© I4' 29.4:7 LONG. I48C'24' 2.590" y .5 940.,.I-77.95 Y,. E;98 012,50 WELL ,,'.lO. ItS L AT. 70° {':; .Su, '-':9' Y 5 940 595.50 LONG. 14,r¢r:,:....:.4'5,258" ,,.v 697 9-:47.12_ u-'FL. LL,, t"-!0, I? 1... A.-F ,/(:.° 14'.~ I. . i'[>.. :" .',' [) 9:© 7'!? . ~'~ ~ ~'"~,} 1,18024: '5.8~6" X {:S7 96f.74 i ; ,.. f ;;t,! -_4', '~C:, ! ']Y.-3. 'Z :k~t )V'!.'. ~,~ L L.'// d.:~ (:×tSTI.Nt': W:i..u. OR CO ~l f.',, U ~.' f :J :-.': P':, £: · ': CHECK LIST FOR NEW WELL PERMITS Company Yes NO Remark 1. Is the permit fee attached ....... ~ .............. Lease & Well No. .. 2. Is well to be located in a defined pool . .- . . , ......... ~?~)~L~ 3. Is a registered survey plat attached ...... . .......... ~.~..¥~.L~ 4. Is well located proper distance from.property line 5. Is well located proper distance from other wells ............. ........ ;~ 6. Is sufficient undedicated acreage available in this pool ...... 7. Is well to be deviated .................... · 8. Is operator the only affected party ............ 9. Can permit be approved before ten-day wai~ .......... lO. Does operator have a bond in force ............. Il. Is a conservation order needed ............... 12. Is administrative approval needed ....... . . 13. Is conductor string provided .................. 14. Is enouqh cement used to circulate on conductor and surface . 15. Will cement tie in surface and intermediate or production strings 16. Will cement cover all known productive horizons ....... 17. Will surface casing protect fresh water zones .... i8. Will all casing give adequate safety in collapse, tension & burst 19. Does BOPE have sufficient pressure ratina - Test to ~c~mc9 psig 20. Has DMEII approved Plan of Operation ......... Additional Requirements' Approval Recommended' Geology' En~ineering- HWK /--/~¢~¢-,,,, LOS ~.,~,:. RAD ' Revised 11/17/76 Well History File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history file. To improve the readability of the Well History file and to simplify finding information, information-of this nature is-accumulated at the end of the file under APPENDIX. .. No special'effort has been made to chronologically organize this category of information. -: o ,. LIBRARY TAPE CURVE SPECIFICATIONS Company ARCO ALASKA INC. Well D.S. 1-13 ECC# 2584 Field PRUDHOE BAY County, State NORTH SLOPE, ALASKA Date 12/19/86 Curve Name (Abbrev.) Standard Curve Name Logs Used Scale CCL LS SS G1 GLES G2 GR BKL BKS MON CSS ISS MSD SGMA RATO RICS RIN i FILES 1-3 t Casing Collar Locator Long Space Short Space Gate 1 I , , L Gate 2 Gamma Ray Background Lonq space' Background Short Soace Monitor t Capture Short Space t Inelastic Short Space Mean Std. Dev. Sigm. a Ratio of CaotureCounts Ratio or Inelastic to Captuz Ratio of Inelastics PDK-100 · e " 400-600 3-2700 -6000-54000 )-72000 ),-12000. )-100 )-3OO :)-~00 ~-0 60-0 33-3 43-0 14-4, RBOR Borehole Ratio " 3 to -1 Page 2 of 2 LIBP. ARY TAPE CURVE SPECIFICATIONS · Company ARCO Alaska ~ Inc. Well D.S. 1-13· ECC# 2584 Field Prudhoe..Bay County, State North Slope, Alaska Date 12/19186 Curve Name · (Abbrev.) Standard Curve Name Logs Used Scale 60-0 SGAV f Average Sigma tpDK-IO0 RCAV RTAV GR Average RICS Average Ratio Gamma Ray Pass 1 14-4 43-0 33-3 0-100 LENGTH: *~ INFO~MATiC'N RECORDS UNZTS STAT ; ALASKA LCC : CURVE N&ME LS MON BKS M S [; RgCR RICS REP~7 SIZ~ 4 4 4 4 ~: 4 -o U 4 1 1 I i UNITS CpS CPb CmS CmS C P S ~U ,.., ~. M 01,'4 cN~RY ~EOCKS CPS EKS ~Pl !SS RB'OR i 6B 4 UNITS 1 fPS ,.~ 1 -1 u -S I CPS 1 CPS I SU ! SiM ~=nTH iuc98.sCO FT ~i~ C C L O. C CC L,S ,2. rd UC: s s S G M $. - 't I . i 'i 0 M .S O 3.5~m R&TO ~.999 C .OCC RSO -c, g 99. C. OOC i 2.34g 1.7CC G~iS i3C707.i00 G2 -i5.5~ G~. iT.ACC ~ON ~ ~1. RZN O.O00 RICS 2.1 ~4 ©(PTH 10t09. '"" 0 F'"' '~ u, ~,00 ~ S I 4.42,5 $ S 1'~,,. · 593 S~- -g 9.09 · r' '-' C_. ¢ ENDING DEPTH =- 99~.~0u FT ,~u~o,,~a~.'u M --NEXT FiLE NAFS: ~lJ~V~ ~ 'NA~E~ CODE ---5Z7~ SAMPLE UNZTS GEiS 6~ ~ I CPS ~' ~ ~ 4 i ~i ~'~L 68 4 ! CSS ,SF~ T i APZ SG~i~ 68' ~ 1 SU 'RATU '-- 6~ ~ 1 RiN 08 --4 t CCB E Si,:-.:- SAMFLE UNITS LS G2 M C N r,~ b O ~<igs CPS UUb SU D '" ENTRY BLOCKS TOR DATUM SP~CiFiCATiOiN 5LOCK.S UNITS 6S O I ~',~ tS 6.~ CP'q G2 oD' '"' A P I ,4,u N 6 ,d 5 U rq S L 6 ~ I BI ~ ~ l C S '~ 1 ~, I 4 I 4 1 Z, 1 4-- 1 CURVE REFR C 0 0 E SS 27 c,.27..'2_ iC ,SE RgOR -¢e99 .JJO 502 I COL 0.000 LS 2235.893 SS GEl S 131330.400 G2 196,~ .4~1 O~ ~-KL 55.S62 5KS 122.208 CSS ~qWM~,, ~..~.~q~ MS~,:~ rj ,~3~., ~TO.. R~N 5 ~5~ RI~ 12 005 DEPTH iOlOO.CCO ~T 3078.4860 M GEqs 121507.900 ~ ' ~ ~- ,~ ~C. lu,4, e SGMA !9.9~o f'~=-~u u.~70~' ~ R~TO RIN, 4.:;I~ ~iCS In. ,~ .. 2!1 ~o072.92C Ge -9~99.00iu I ? ...... 8~ 2 ~ON, .<60. i i 6 ~8030.86C ISS 286~1Z.'eCS ~.2-1~ R~OR i.415 qTARTiNG OE~TH =iC; . 316~170 M ~NDiNG DEPTH = 993,.¢.500 FT 3C?S.O~2O M ** ~=ILE FiLE 'vERSiON 85/ii/ F Z LE TY LC' N E XT ~ ~ ; O&Tc:' o¢/ ~ ,/x,, ' ' ' APZN : 50-r,?0-'~0270,_. ,. ,..., CN : ARCC. ALASKA WN : D,S. t-t3 C3UN : N.SLCO= LCC : i 50 · OO r NC ,& m ~NTR~ ENTRY CESCRi~u~-~i , -CURVE ~EPR NAME CO~E SiZE SAMPLE UNITS _. Sb CURVE NAME CCSE SiZ= -CSS 68 4' I I II i Iii L$ 8E 4 L, 2 ~ 8 H 0 N !8- - -- ~8 ~ - S ~ikiPL~ UiN_~TS 1 CPS 1 4 1 4 I C ~ S - 4- 1 CoS 4 - i SO -- 4- - -1 mNTRY ~,L9C~$ -0.$00 LEVEL SPaCiNG DATUM SPECi;iC~TiOiN $LOCKS I , CURVE RECR 68 4. 1 6 3 4 1 CPS C~S O ! F! 2C.68i MON -'; 90g, O;3J -'~ ,~C~9.30,3 506.712 i;.57i R~,OR 11.555 615..:. ~ .:, I .4.62 9.~;~C ISS 8 .'-~2--- Rt, OR ~ ¢. z. 806.617 SS 4;'52L.~2C ........... a ~ ~'?~ ':~ -: ~ ' v'~: :'~'~ '- -~ ~-KL 220.350 " ........... 26640.63C O 0.189 R,&TO 9.694 z~ t0.298 MON "'SS RSOR - g O 99. C 0 _57G. 567 565. ~':72 27 1 :::~ 3 C · ,.,5. 00 ! .417 MON R E,OR 57'3.337 27 2 ~ 47.5 ',-~ 0 1./-.." 4 ' '" "'~' F 420 ENDING OEPTH - '~,..~.~uu~"" r ~ ~2~-.0 ~I SERV!CT£ N~,.'~E: VERS'~CN # : I D~,TE: 35/11/2G MAX R~L,_ u LENCT~,,~ ,:: FILE TYPE: LO Ii324 ~YTES '~* iNFORMaTION RECORDS U N : N. ENTRY BLOCKS ~.SCR T F'T ZOri ENTRY D .... F~ME CODE SiZE SAMPL-E- UI',~ITS ~ D~h! ~ I CPS G ~-i ' 68 ~ I C ~ ~ -- i -- CURVE REDR NAME COOE I:l I II I III I LS GE MSD 250~ RICS 6~ 68 SIZE 4 S~MPL~ 1 1 ! 1 t I uNiTS CPS CoS CPS CPS C~S C ir"'; ENTRY ~LOCKS TYF2 ~ f,,iTR Y S-SCRZ ~'T-ZCN N~ME CCL GEl $ SIMPLE "I .,i,. Ii ,..., i. I i S$ :.: ._: 10. 761 3498 SS z, 2328.27C S~ 2,8. 363 MON **' FILE TRAILER ,.ClL~_ NAM'=,..: 0~.'¢, ....~ .~'~.004 SERVZCE NAME: VERSZON ¢ : 1 O~TE: 851tl/ -ILE NAMe= . __ , ~ INF-C'RM4TiOr~ RECORDS - MN,= N CON T ~iN ] S U !'4 "L 'f ~ LZ STAI . ~L LCC : ~NTRY 8LOC~S ,,. 7'¥PE ENTRY O~-'-Ri°TI~Nc~-: , - ~, ,_ . ~_ ~ECREASE P~CING ~~ ,~ L~VEL S~CINS. OA!UM 5PECIFZC&TiON 8LOCKS Cij~VE RAAV 68 4 ! TYPE ENTRY O~SCRiPTiON ...... LZ ..... Z .............. 50 NAXiMUM FRAMES/RECORD TERNiNATOR -0.500 LEVEL SPACING un~.TUNI, SP~CZ;tC~T'rnN~ ,~,.. DLOCK$._ , ~A$.V il.64i RCAV i e.734 ~CAV RC~V 10'.142 i3.?&~ i0.i .... i : 01 TOTAL RECORDS: 341 77. o.vet * ALASKA COMPUTING CENTER . ****************************** . ............................ * ....... SCHLUMBERGER ....... . ............................ ****************************** COMPANY NAME : ARCO ALASKA INC. WELL NAME : D.S. 1-13 FIELD NAME : PRUDHOE BAY BOROUGH : NORTH SLOPE STATE : ALASKA API NUMBER : 500292027000 REFERENCE NO : 98230 LIS Tape Verification Listing Schlumberger Alaska Computing Center 14-MAY-1998 15:26 PAGE: **** REEL HEADER **** SERVICE NAME : EDIT DATE : 98/05/14 ORIGIN : FLIC REEL NAME : 98230 CONTINUATION # : PREVIOUS REEL : COGENT : ARCO ALASKA INC., PRUDHOE BAY, D.S. 1-13, API# 50-029-20270-00 **** TAPE HEADER **** SERVICE NAME : EDIT DATE : 98/05/14 ORIGIN : FLIC TAPE NAME : 98230 CONTINUATION # : 1 PREVIOUS TAPE : COMMENT : ARCO ALASKA INC., PRUDHOE BAY, D.S. 1-13, API# 50-029-20270-00 TAPE HEADER PRUDHOE BAY CASED HOLE WIRELINE LOGS WELL NAME: D.S. 1-13 API NUMBER: 500292027000 OPERATOR: ARCO ALASKA INC. LOGGING COMPANY: SCHLUMBERGER WELL SERVICES TAPE CREATION DATE: 14-MAY-98 JOB NIIMBER: 98230 LOGGING ENGINEER: J. PAWLUK OPERATOR WITNESS: G. SAUBER SURFACE LOCATION SECTION: 8 TOWNSHIP: 1 ON RANGE: 1SE FNL: 662 FSL: FEL : FWL : 733 ELEVATION (FT FROM MSL O) KELLY BUSHING: 73. O0 DERRICK FLOOR: GROUND LEVEL: 34. O0 WELL CASING RECORD OPEN HOLE CASING DRILLERS CASING BIT SIZE (IN) SIZE (IN) DEPTH (FT) WEIGHT (LB/FT) 1ST STRING 10. 500 9. 625 2ND STRING 3RD STRING PRODUCTION STRING CURVE SHIFT DATA - ALL PASSES TO STANDARD (MEASURED DEPTH) LIS Tape Verification Listing Schlumberger Alaska Computing Center 14-NIAY-1998 15:26 BASELINE CURVE FOR SHIFTS LDWG TOOL CODE: BCS LDWG CURVE CODE: GR RUN NUMBER: PASS NUMBER: DATE LOGGED: 23-0CT-77 LOGGING COMPANY: SCHLUMBERGER WELL SERVICES BASELINE DEPTH 88888.0 10174.5 10172.5 10165.5 10153 5 10146 5 10143 5 10135 5 10133 0 10120 5 10119 0 10117.0 10115.0 10113.5 10107.0 10105.5 10101.5 10096.5 10095.0 10091.5 10089.5 10087.5 10085.5 10080.5 10078.0 10074.0 10070.0 10069.0 10068.0 10065 0 10061 0 10060 5 10057 5 10055 0 10053 0 10045 5 10042.0 10040.5 10038.5 10035.5 10033.0 10030.0 10028.0 10025.5 10023.0 .......... EQUIVALENT UNSHIFTED DEPTH .......... GR CH CNTG 88889.0 88890.0 10176.5 10173.5 10166.5 10153.0 10145.5 10134.0 10119.0 10116.0 10113.5 10107.0 10104.0 10100.5 10095.0 10088.5 10085.5 10082.5 10078.0 10074.0 10069.5 10067.5 10065.0 10059.5 10056.5 10055.0 10052.5 10040.5 10036.5 10034.0 10031.0 10028.5 10023.0 10145.0 10133.5 10121.0 10116.5 10095.0 10092.5 10088.5 10069.5 10065.0 10059.5 10046.5 10040.5 10034.0 10029.5 10022.5 PAGE: LIS Tape Verification Listing Schlumberger Alaska Computing Center 14-MAY-1998 15:26 10020.0 10019.5 10015.0 10014.5 10010.0 10009.5 10009.0 10009.0 10007.5 10005.5 10005.5 10006.0 10000.0 9999.0 9999.5 9999.0 9997.5 9995.5 9993.0 9993.5 9990.5 9990.0 9990.0 9990.0 9984.0 9983.5 9985.5 100.0 99.5 101.5 $ REMARKS: CONTAINED HEREIN IS THE LDWG FORMATTED CASED HOLE CNTG DATA AQUIRED ON ARCO'S DS 1-13 WELL. THE DEPTH SHIFTS SHOWN ABOVE REFLECT CORRELATIONS BETWEEN GRCH PASS #1 AND THE BCS GA3gVZA RAY, ALSO PASS #1 NPHI AND THE BCS GA3gVA RAY, CARRYING ALL CNTD CURVES WITH THE NPHI SHIFTS. $ PAGE: **** FILE HEADER **** FILE NAME : EDIT .001 SERVICE : FLIC VERSION · O01CO1 DATE · 98/05/14 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER: 1 EDITED CURVES Depth shifted and clipped curves for each pass in separate files. PASS NUMBER: 1 DEPTH INCREMENT: O . 5000 FILE S~Y LDWG TOOL CODE START DEPTH STOP DEPTH GRCH 1 O176.0 9979.5 CNTG 10182.0 9981 . 5 $ CURVE SHIFT DATA - PASS TO PASS(MEASURED DEPTH) BASELINE CURVE FOR SHIFTS LDWG CURVE CODE: PASS NUMBER: .......... EQUIVALENT UNSHIFTED DEPTH .......... LIS Tape Verification Listing Schlumberger Alaska Computing Center 14-MAY-1998 15:26 PAGE: BASELINE DEPTH GRCH CNTG $ REMARKS: THIS FILE CONTAINS CASED HOLE CNTG PASS #1. NO PASS TO PASS SHIFTS APPLIED TO THIS DATA. $ LIS FORMAT DATA THERE ARE ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 68 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 15 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 0 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 1088251 O0 000 O0 0 1 1 1 4 68 0000000000 NPHI CNTG PU-S 1088251 O0 000 O0 0 1 1 1 4 68 0000000000 ENPH CNTG PU-S 1088251 O0 000 O0 0 1 1 1 4 68 0000000000 CPHI CNTG PU-S 1088251 O0 000 O0 0 1 1 1 4 68 0000000000 NRAT CNTG 1088251 O0 000 O0 0 1 1 1 4 68 0000000000 CRAT CNTG 1088251 O0 000 O0 0 1 1 1 4 68 0000000000 ENRA CNTG 1088251 O0 000 O0 0 1 1 1 4 68 0000000000 NCNT CNTG CPS 1088251 O0 000 O0 0 1 1 1 4 68 0000000000 FCNT CNTC CPS 1088251 O0 000 O0 0 1 1 1 4 68 0000000000 CNTC CNTG CPS 1088251 O0 000 O0 0 1 1 1 4 68 0000000000 CFTC CNTG CPS 1088251 O0 000 O0 0 1 1 1 4 68 0000000000 CNEC CNTG CPS 1088251 O0 000 O0 0 1 1 1 4 68 0000000000 CFEC CNTG CPS 1088251 O0 000 O0 0 1 1 1 4 68 0000000000 LIS Tape Verification Listing Schlumberger Alaska Computing Center 14-MAY-1998 15:26 PAGE: NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) GRCH CNTG GAPI 1088251 O0 000 O0 0 1 1 1 4 68 0000000000 TENS CNTG LB 1088251 O0 000 O0 0 1 1 1 4 68 0000000000 CCL CNTG V 1088251 O0 000 O0 0 1 1 1 4 68 0000000000 GR BCS GAPI 1088251 O0 000 O0 0 1 1 1 4 68 0000000000 ** DATA ** DEPT. 10300.000 NPHI.CNTG -999.250 ENPH. CNTG -999.250 CPHI.CNTG NR~T. CNTG -999.250 CRAT. CNTG -999.250 ENRA.CNTG -999.250 NCNT. CNTG FCNT. CNTG -999.250 CNTC. CNTG -999.250 CFTC. CNTG -999.250 CNEC. CNTG CFEC. CNTG -999.250 GRCH. CNTG -999.250 TENS.CNTG -999.250 CCL. CNTG GR.BCS 36.119 DEPT. 9950.000 NPHI.CNTG -999.250 ENPH. CNTG NRAT. CNTG -999.250 CRAT. CNTG -999.250 ENRA.CNTG FCNT. CNTG -999.250 CNTC. CNTG -999.250 CFTC. CNTG CFEC. CNTG -999.250 GRCH. CNTG -999.250 TENS.CNTG GR.BCS 85.159 -999.250 CPHI.CNTG -999.250 NCNT. CNTG -999.250 CNEC. CNTG -999.250 CCL.CNTG -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .001 SERVICE : FLIC VERSION : O01CO1 DATE : 98/05/14 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .002 SERVICE : FLIC VERSION : O01CO1 DATE : 98/05/14 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER: EDITED CURVES LIS Tape Verification Listing Schlumberger Alaska Computing Center 14-MAY-1998 15:26 PAGE: Depth shifted and clipped curves for each pass in separate files. PASS NUMBER: 2 DEPTH INCREMENT: O. 5000 FILE SbIV~iARY LDWG TOOL CODE START DEPTH STOP DEPTH GRCH 1 O175.5 9981 . 0 CNTG 10182.0 9982.0 $ CURVE SHIFT DATA - PASS TO PASS (MEASURED DEPTH) BASELINE CURVE FOR SHIFTS LDWG CURVE CODE: GRcH PASS NUMBER: 1 BASELINE DEPTH 88888.0 10175.0 10172.5 10171.0 10170.0 10165.5 10161.5 10160.5 10156.5 10156.0 10154.0 10153.0 10152.0 10148.5 10146.0 10144.0 10140.0 10134.0 10132.5 10132.0 10126.5 10120.0 10119.0 10117.5 10112.0 10106.5 10104.5 10100.5 10097.5 10096.0 10092.5 10089.5 10087.5 10085.0 10081.0 10080.5 .......... EQUIVALENT UNSHIFTED DEPTH GRCH CNTG 88888.5 88890.0 10177.0 10173.0 10173.0 10170.0 10166.5 10162.0 10160.5 10158.0 10156.0 10156.5 10153.0 10154.0 10148.5 10144.5 10145.5 10141.5 10134.0 10134.0 10132.0 10127.5 10119.0 10121.0 10116.5 10116.5 10106.5 10104.0 10100.5 10095.5 10095.5 10091.5 10089.0 10088.5 10085.5 10081.5 10082.5 LIS Tape Verification Listing Schlumberger Alaska Computing Center 14-MAY-1998 15:26 PAGE: 10077.5 10075.0 10073.5 10070.5 10069 0 10068 5 10066 5 10065 5 10060 5 10058 0 10055 5 10048 0 10045 5 10041 5 10036 0 10035 5 10030 5 10029 5 10024 5 10023.0 10021.0 10018.5 10015.0 10013.5 10010.5 1OOO8.0 10007.5 10005.5 10003.0 10000.0 9999.5 9996.5 9993.0 9992.5 9990.0 9987.5 9984.5 100.0 $ 10077.0 10074.5 10069.5 10067.5 10065.0 10059.5 10056.5 10055.0 10046.5 10034.0 10028.5 10022.5 10020.0 10016.5 10014.0 10009.0 10006.0 10002.0 9999.0 9997.0 9993.5 9990.0 100.0 10074.0 10069.5 10065.0 10059.5 10056.0 10046.5 10040.0 10034.0 10029.5 10022.5 10021.0 10017.0 10009.5 10006.0 9999.5 9991.0 9989.0 9985.5 101.0 REMARKS: THIS FILE CONTAINS CASED HOLE CNTG PASS #2. THE DEPTH SHIFTS SHOWN ABOVE REFLECT CORRELATIONS BETWEEN GRCH PASS #2 AND GRCH PASS #1, ALSO NPHI PASS #2 AND NPHI PASS #1, CARRYING ALL CNTG CURVES WITH THE NPHI SHIFTS. LIS FORMAT DATA LIS Tape Verification Listing Schlumberger Alaska Computing Center 14-MAY-1998 15:26 PAGE: ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 64 4 66 1 5 66 6 73 7 65 8 68 O. 5 9 65 FT 11 66 16 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 1088251 O0 000 O0 0 2 1 1 4 68 0000000000 NPHI CNTG PU-S 1088251 O0 000 O0 0 2 1 1 4 68 0000000000 ENPH CNTG PU-S 1088251 O0 000 O0 0 2 1 1 4 68 0000000000 CPHI CNTG PU-S 1088251 O0 000 O0 0 2 1 1 4 68 0000000000 NRAT CNTG 1088251 O0 000 O0 0 2 1 1 4 68 0000000000 CRAT CNTG 1088251 O0 000 O0 0 2 1 1 4 68 0000000000 ENRA CNTG 1088251 O0 000 O0 0 2 1 1 4 68 0000000000 NCNT CNTC CPS 1088251 O0 000 O0 0 2 1 1 4 68 0000000000 FCNT CNTG CPS 1088251 O0 000 O0 0 2 1 1 4 68 0000000000 CNTC CNTG CPS 1088251 O0 000 O0 0 2 1 1 4 68 0000000000 CFTC CNTG CPS 1088251 O0 000 O0 0 2 1 1 4 68 0000000000 CNEC CNTG CPS 1088251 O0 000 O0 0 2 1 1 4 68 0000000000 CFEC CNTG CPS 1088251 O0 000 O0 0 2 1 1 4 68 0000000000 GRCH CNTG GAPI 1088251 O0 000 O0 0 2 1 1 4 68 0000000000 TENS CNTG LB 1088251 O0 000 O0 0 2 1 1 4 68 0000000000 CCL CNTG V 1088251 O0 000 O0 0 2 1 1 4 68 0000000000 ** DATA ** DEPT. 10182.000 NPHI.CNTC 38.249 ENPH. CNTG 48.026 CPHI.CNTG NRAT. CNTG 3.750 CRAT. CNTG 3.501 ENRA.CNTG 6.293 NCNT. CNTG FCNT. CNTG 471.253 CNTC. CNTG 1733.671 CFTC. CNTG 532.375 CNEC. CNTG CFEC. CNTG 352.625 GRCH. CNTG -999.250 TENS.CNTG 3074.000 CCL. CNTG 32. 613 1628. 881 2219. O1 7 - O. 022 LIS Tape Verification Listing Schlumberger Alaska Computing Center 14-MAY-1998 15:26 PAGE: DEPT. 9981.000 NPHI.CNTG -999.250 ENPH. CNTG NRAT. CNTG -999.250 CRAT. CNTG -999.250 ENRA.CNTG FCNT. CNTG -999.250 CNTC. CNTG -999.250 CFTC. CNTG CFEC. CNTG -999.250 GRCH. CNTG 29.644 TENS.CNTG -999.250 CPHI.CNTG -999.250 NCNT. CNTG -999.250 CNEC. CNTG -999.250 CCL.CNTG -999.250 -999.250 -999.250 -999.250 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .002 SERVICE : FLIC VERSION : O01CO1 DATE : 98/05/14 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .003 SERVICE : FLIC VERSION : O01CO1 DATE : 98/05/14 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE ATUMBER: 3 EDITED CURVES Depth shifted and clipped curves for each pass in separate files. PASS NUMBER: 3 DEPTH INCREMENT: 0.5000 FILE SUMMARY LDWG TOOL CODE START DEPTH STOP DEPTH GRCH 10176.0 9980.5 CNTG 10183.0 9981 . 5 $ CURVE SHIFT DATA - PASS TO PASS (MEASURED DEPTH) BASELINE CURVE FOR SHIFTS LDWG CURVE CODE: GRCH PASS NUMBER: 1 BASELINE DEPTH .......... EQUIVALENT UNSHIFTED DEPTH .......... GRCH CNTG LIS Tape Verification Listing Schlumberger Alaska Computing Center 14-MAY-1998 15:26 PAGE: 10 88888 0 10174 0 10172 5 10172 0 10161 5 10159 0 10157 0 10156.0 10154 5 10153 0 10151 5 10149 0 10148 0 10147 0 10144 0 10134 5 10132 0 10131 0 10126.5 10123.5 10120.0 10119.0 10116.5 10115.0 10114.0 10105.5 10104.0 10100.0 10097.5 10093.5 10089.5 10087.0 10086.5 10085.5 10080.0 10077.5 10073.0 10069.5 10068.0 10066.0 10064.0 10063.0 10060. $ 10058.0 10055.5 10053.5 10051.0 10045.0 10042.0 10040.5 10038.0 10036.0 10035.5 10030.0 10024.0 88889.0 10173.5 10162.5 10156.5 10153.0 10149.0 10146.0 10134.0 10130.5 10119.5 10116.0 10113.5 10107.0 10104.0 10095.5 10093.5 10089.0 10088.0 10085.5 10081.0 10078.0 10074.0 10069.5 10067.5 10065.0 10062.5 10060.0 10055.5 10052.5 10049.0 10040.5 10036.5 10034.0 10028.5 10023.0 88891.0 10177.0 10173.5 10160.5 10158.0 10156.5 10154.0 10150.0 10145.5 10134.0 10127.5 10124.5 10121.0 10116.5 10100.5 10088.5 10065.0 10059.5 10056.5 10046.5 10040.0 10034.5 LIS Tape Verification Listing Schlumberger Alaska Computing Center 14-MAY-1998 15:26 PAGE: 11 10020.5 10019.5 10015.5 10014.0 10009.5 10007.0 10006.0 10005 0 10003 0 9999 5 9997 5 9993 0 9991 0 9990 5 9984 0 9983 0 100 0 $ 10019.5 10016.5 10014.5 10008.5 10005.5 10002.0 9998.5 9993.5 9991.0 9983.5 100.5 10021.0 10009.0 10006.0 9999.5 9995.5 9989.5 9985.5 101.5 REMARKS: THIS FILE CONTAINS CASED HOLE CNTG PASS #3. THE DEPTH SHIFTS SHOWN ABOVE REFLECT CORRELATIONS BETWEEN GRCH PASS #3 AND GRCH PASS #1, ALSO NPHI PASS #3 AND NPHI PASS #1, CARRYING ALL CNTG CURVES WITH THE NPHI SHIFTS. $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 64 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 16 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 LIS Tape Verification Listing Schlumberger Alaska Computing Center 14-MAY-1998 15:26 PAGE: 12 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELE~ CODE (HEX) DEPT FT 1088251 O0 000 O0 0 3 1 1 4 68 0000000000 NPHI CNTG PU-S 1088251 O0 000 O0 0 3 1 1 4 68 0000000000 ENPH CNTG PU-S 1088251 O0 000 O0 0 3 1 1 4 68 0000000000 CPHI CNTG PU-S 1088251 O0 000 O0 0 3 1 1 4 68 0000000000 NRAT CNTG 1088251 O0 000 O0 0 3 1 1 4 68 0000000000 CRAT CNTG 1088251 O0 000 O0 0 3 1 1 4 68 0000000000 ENRA CNTG 1088251 O0 000 O0 0 3 1 1 4 68 0000000000 NCNT CNTG CPS 1088251 O0 000 O0 0 3 1 1 4 68 0000000000 FCNT CNTG CPS 1088251 O0 000 O0 0 3 1 1 4 68 0000000000 CNTC CNTG CPS 1088251 O0 000 O0 0 3 1 1 4 68 0000000000 CFTC CNTG CPS 1088251 O0 000 O0 0 3 1 1 4 68 0000000000 CNEC CNTG CPS 1088251 O0 000 O0 0 3 1 1 4 68 0000000000 CFEC CNTG CPS 1088251 O0 000 O0 0 3 1 1 4 68 0000000000 GRCH CNTG GAPI 1088251 O0 000 O0 0 3 1 1 4 68 0000000000 TENS CNTG LB 1088251 O0 000 O0 0 3 1 1 4 68 0000000000 CCL CNTG V 1088251 O0 000 O0 0 3 1 1 4 68 0000000000 ** DATA ** DEPT. 10183.000 NPHI.CNTG 36.387 ENPH. CNTG 47,396 CPHI.CNTG NRAT. CNTG 3.580 CRAT. CNTG 3.399 ENRA.CNTG 6,243 NCNT. CNTG FCNT. CNTG 481.106 CNTC. CNTG 1664.158 CFTC. CNTG 528,220 CNEC. CNTG CFEC. CNTG 349.718 GRCH. CNTG -999.250 TENS. CNTG 3369,000 CCL.CNTG DEPT. 9980.500 NPHI.CNTG -999.250 ENPH. CNTG -999,250 CPHI.CNTG NRAT. CNTG -999.250 CRAT. CNTG -999.250 ENRA.CNTG -999,250 NCNT. CNTG FCNT. CNTG -999.250 CNTC. CNTG -999.250 CFTC. CNTG -999,250 CNEC. CNTG CFEC. CNTG -999.250 GRCH. CNTG 26,324 TENS.CNTG -999,250 CCL.CNTG 30,954 1573.511 2183.140 -0.005 -999,250 -999.250 -999.250 -999,250 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .003 SERVICE : FLIC VERSION : O01CO1 DATE : 98/05/14 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : LIS Tape Verification Listing Schlumberger Alaska Computing Center 14-MAY-1998 15:26 PAGE: 13 **** FILE HEADER **** FILE NAME : EDIT .004 SERVICE · FLIC VERSION · O01CO1 DATE : 98/05/14 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER: 4 AVERAGED CURVES Compensated Neutron: Arithmetic average of edited passes for all curves. DEPTH INCREMENT 0.5000 PASSES INCLUDED IN AVERAGE LDWG TOOL CODE PASS NUMBERS 1, 2, 3, CNTG $ REMARKS: THIS FILE CONTAINS THE ARITHMETIC AVERAGE OF PASSES 1,2, &3.THE DATA WAS CLIPPED AND DEPTH SHIFTED BEFORE THE AVERAGE WAS CALCULATED. $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 56 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 18 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 LIS Tape Verification Listing Schlumberger Alaska Computing Center 14-MAY-1998 15:26 PAGE: 14 * * SET TYPE - CHAN ** NAME SERVUNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELE~ CODE (HEX) DEPT FT 1088251 O0 000 O0 0 4 1 1 4 68 0000000000 NPHI CNAV PU-S 1088251 O0 000 O0 0 4 1 1 4 68 0000000000 NRAT CNAV 1088251 O0 000 O0 0 4 1 1 4 68 0000000000 CPHI CNAV PU-S 1088251 O0 000 O0 0 4 1 1 4 68 0000000000 CRAT CNAV 1088251 O0 000 O0 0 4 1 1 4 68 0000000000 ENPH CNAV PU-S 1088251 O0 000 O0 0 4 1 1 4 68 0000000000 ENRA CNAV 1088251 O0 000 O0 0 4 1 1 4 68 0000000000 NCNT CNAV CPS 1088251 O0 000 O0 0 4 1 1 4 68 0000000000 FCNT CNAV CPS 1088251 O0 000 O0 0 4 1 1 4 68 0000000000 CNTC CNAV CPS 1088251 O0 000 O0 0 4 1 1 4 68 0000000000 CFTC CNAV CPS 1088251 O0 000 O0 0 4 1 1 4 68 0000000000 CNEC CNAV CPS 1088251 O0 000 O0 0 4 1 1 4 68 0000000000 CFEC CNAV CPS 1088251 O0 000 O0 0 4 1 1 4 68 0000000000 GRCH CNTG GAPI 1088251 O0 000 O0 0 4 1 1 4 68 0000000000 ** DATA ** DEPT. 10182.000 NPHI.CNAV 34.614 NRAT. CNAV 3.571 CPHI. CNAV CRAT. CNAV 3.301 ENPH. CNAV 43.768 ENRA.CNAV 5.939 NCNT. CNAV FCNT. CNAV 507. 751 CNTC. CNAV 1794. 250 CFTC. CNAV 561. 200 CNEC. CNAV CFEC. CNAV 380. 256 GRCH. CNTG -999. 250 31.683 1742.386 2253.643 DEPT. 9979.500 NPHI.CNAV -999.250 NRAT. CNAV -999.250 CPHI.CNAV -999.250 CRAT. CNAV -999.250 ENPH. CNAV -999.250 ENRA.CNAV -999.250 NCNT. CNAV -999.250 FCNT. CNAV -999.250 CNTC. CNAV -999.250 CFTC. CNAV -999.250 CNEC. CNAV -999.250 CFEC. CNAV -999.250 GRCH. CNTG 28.084 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .004 SERVICE : FLIC VERSION · O01CO1 DATE : 98/05/14 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : LIS Tape Verification Listing Schlumberger Alaska Computing Center 14-MAY-1998 15:26 PAGE: 15 **** FILE HEADER **** FILE NAME : EDIT .005 SERVICE : FLIC VERSION : O01CO1 DATE : 98/05/14 MAX REC SIZE : 1024 FILE TYPE '. LO LAST FILE : FILE HEADER FILE NUMBER 5 RAW CURVES Curves and log header data for each pass in separate files; raw background pass in last file PASS NUMBER: 1 DEPTH INCREMENT: O . 5000 FILE SUMMARY VENDOR TOOL CODE START DEPTH CNTG 10211.5 $ LOG HEADER DATA STOP DEPTH 9975.5 DATE LOGGED: SOFTWARE VERSION: TIME LOGGER ON BOTTOM: TD DRILLER (FT) : TD LOGGER (FT) : TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT) : LOGGING SPEED (FPHR) : DEPTH CONTROL USED (YES/NO): TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE GR GAMMA RAY CNTG COMPENSATED NEUTRON $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLERS CASING DEPTH (FT) : LOGGERS CASING DEPTH (FT) : BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G) '. SURFACE TEMPERATURE (DEGF) : BOTTOM HOLE TEMPERATURE (DEGF) : FLUID SALINITY (PPM) : FLUID LEVEL (FT) : 31 -DEC- 97 8C0 - 069 1200 31 -DEC-97 10196.0 10190.0 9980.0 10180.0 1800.0 TOOL NUMBER SGT-L CNT-GA 10.500 PRODUCED FLUIDS LIS Tape Verification Listing Schlumberger Alaska Computing Center 14-MAY-1998 15:26 PAGE: 16 FLUID RATE AT WELLHEAD (BPM): WATER CUTS (PCT): GAS~OIL RATIO: CHOKE (DEG): NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL) MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): EPITHERMAL SANDSTONE 2.65 BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE TOP NORMALIZING WINDOW (FT) : BASE NORMALIZING WINDOW (FT): BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (CPS): 0 FAR COUNT RATE HIGH SCALE (CPS): 6000 NEAR COUNT RATE LOW SCALE (CPS): 0 NEAR COUNT RATE HIGH SCALE (CPS): 24000 TOOL STANDOFF (IN): REMARKS: TIED INTO GH CNL DATED 5/2/86 LOGGED THREE PASSES AT 1800 FPH ON SANDSTONE MATRIX PUMPED 260 BBLS CRUDE BEFORE LOGGING AND 2 BPM WHILE LOGGING GOC APPEARS TO BE AT 10153' TD TAGGED AT 10190' THIS FILE CONTAINS THE RAW DATA FOR PASS #1. $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE ~ 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 76 4 66 1 5 66 6 73 7 65 8 68 O. 5 9 65 FT 11 66 13 12 68 13 66 0 14 65 FT LIS Tape Verification Listing Schlumberger Alaska Computing Center 14-MAY-1998 15:26 PAGE: 17 TYPE REPR CODE VALUE 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERVUNIT SERVICE API API API API FILE NU~IB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELE~ CODE (HEX) DEPT FT 1088251 O0 000 O0 0 5 1 1 4 68 0000000000 NPHI PS1 PU 1088251 O0 000 O0 0 5 1 1 4 68 0000000000 ENPH PS1 PU 1088251 O0 000 O0 0 5 1 1 4 68 0000000000 TNPH PS1 PU 1088251 O0 000 O0 0 5 1 1 4 68 0000000000 TNRA PS1 1088251 O0 000 O0 0 5 1 1 4 68 0000000000 RTNR PS1 1088251 O0 000 O0 0 5 1 1 4 68 0000000000 ENRA PS1 1088251 O0 000 O0 0 5 1 1 4 68 0000000000 CFEC PS1 CPS 1088251 O0 000 O0 0 5 1 1 4 68 0000000000 CNEC PS1 CPS 1088251 O0 000 O0 0 5 1 1 4 68 0000000000 RCEF PS1 CPS 1088251 O0 000 O0 0 5 1 1 4 68 0000000000 RCEN PS1 CPS 1088251 O0 000 O0 0 5 1 1 4 68 0000000000 RCNT PS1 CPS 1088251 O0 000 O0 0 5 1 1 4 68 0000000000 RCFT PS1 CPS 1088251 O0 000 O0 0 5 1 1 4 68 0000000000 CNTC PS1 CPS 1088251 O0 000 O0 0 5 1 1 4 68 0000000000 CFTC PS1 CPS 1088251 O0 000 O0 0 5 1 1 4 68 0000000000 NPOR PS1 PU 1088251 O0 000 O0 0 5 1 1 4 68 0000000000 GR PSi GAPI 1088251 O0 000 O0 0 5 1 1 4 68 0000000000 TENS PS1 LB 1088251 O0 000 O0 0 5 1 1 4 68 0000000000 CCL PS1 V 1088251 O0 000 O0 0 5 1 1 4 68 0000000000 ** DATA ** DEPT. 10211.500 NPHI.PS1 14.892 ENPH. PS1 54.331 TNPH. PS1 TNRA.PS1 2.132 RTNR.PS1 2.286 ENRA.PS1 6.774 CFEC. PS1 CNEC. PS1 2626.987 RCEF. PS1 365.337 RCEN. PS1 2239.475 RCNT. PS1 RCFT. PS1 857.801 CNTC. PS1 1958.941 CFTC.PSI 942.149 NPOR.PS1 GR.PS1 81.818 TENS.PSi 2445.000 CCL.PS1 -0.019 DEPT. 9975.500 NPHI.PS1 30.837 ENPH. PS1 36.507 TNPH. PS1 TNRA. PS1 3.094 RTNR.PS1 3.509 ENRA.PS1 5.300 CFEC. PS1 CNEC. PS1 2632.896 RCEF. PS1 424.310 RCEN. PS1 2118.245 RCNT. PS1 RCFT. PS1 582.290 CNTC.PS1 1906.918 CFTC. PSI 595.694 NPOR.PS1 GR.PS1 133.588 TENS.PSi 3138.000 CCL.PS1 -999.250 15.392 387.813 1984.816 15.392 31.744 496.796 1841.461 33.665 ** END OF DATA ** LIS Tape Verification Listing Schlumberger Alaska Computing Center 14-MAY-1998 15:26 PAGE 18 **** FILE TRAILER **** FILE NAME : EDIT .005 SERVICE · FLIC VERSION · O01CO1 DATE : 98/05/14 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .006 SERVICE : FLIC VERSION : O01CO1 DATE : 98/05/14 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER 6 RAW CURVES Curves and log header data for each pass in separate files; raw background pass in last file PASS NUMBER: 2 DEPTH INCREMENT: 0.5000 FILE S07V~IARY VENDOR TOOL CODE START DEPTH STOP DEPTH 10209.0 9981.0 CNTG $ LOG HEADER DATA DATE LOGGED: 31-DEC-97 SOFTWARE VERSION: 8C0 - 069 TIME LOGGER ON BOTTOM: 1200 31-DEC-97 TD DRILLER (FT) : 10196.0 TD LOGGER (FT) : 10190.0 TOP LOG INTERVAL (FT) : 9980.0 BOTTOM LOG INTERVAL (FT) : 10180.0 LOGGING SPEED (FPHR) : 1800.0 DEPTH CONTROL USED (YES/NO): TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE GR GAMMA RAY CNTG COMPENSATED NEUTRON BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): TOOL NUMBER SGT-L CNT-GA 10.500 LIS Tape Verification Listing Schlumberger Alaska Computing Center 14-MAY-1998 15:26 PAGE: 19 DRILLERS CASING DEPTH (FT) : LOGGERS CASING DEPTH (FT) '. BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE TEMPERATURE (DEGF) : BOTTOM HOLE TEMPERATURE (DEGF): FLUID SALINITY (PPM) : FLUID LEVEL (FT) : FLUID RATE AT WELLHEAD (BPM): WATER CUTS (PCT) : GAS~OIL RATIO: CHOKE (DEG) : PRODUCED FLUIDS NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): EPITHERMAL SANDSTONE 2.65 BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE TOP NORMALIZING WINDOW (FT): BASE NORMALIZING WINDOW (FT) : BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (CPS): 0 FAR COUNT RATE HIGH SCALE (CPS): 6000 NEAR COUNT RATE LOW SCALE (CPS): 0 NEAR COUNT RATE HIGH SCALE (CPS): 24000 TOOL STANDOFF (IN): REMARKS: TIED INTO GH CNL DATED 5/2/86 LOGGED THREE PASSES AT 1800 FPH ON SANDSTONE MATRIX PUMPED 260 BBLS CRUDE BEFORE LOGGING AND 2 BPM WHILE LOGGING GOC APPEARS TO BE AT 10153' TD TAGGED AT 10190' THIS FILE CONTAINS THE RAW DATA FOR PASS #2. $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 76 LIS Tape Verification Listing Schlumberger Alaska Computing Center 14-MAY-1998 15:26 PAGE: 20 TYPE REPR CODE VALUE 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 13 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERVUNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 1088251 O0 000 O0 0 6 1 1 4 NPHI PS2 PU 1088251 O0 000 O0 0 6 1 1 4 ENPH PS2 PU 1088251 O0 000 O0 0 6 1 1 4 TNPH PS2 PU 1088251 O0 000 O0 0 6 1 1 4 TNRA PS2 1088251 O0 000 O0 0 6 1 1 4 RTNR PS2 1088251 O0 000 O0 0 6 1 1 4 ENRA PS2 1088251 O0 000 O0 0 6 1 1 4 CFEC PS2 CPS 1088251 O0 000 O0 0 6 1 1 4 CNEC PS2 CPS 1088251 O0 000 O0 0 6 1 1 4 RCEF PS2 CPS 1088251 O0 000 O0 0 6 1 1 4 RCEN PS2 CPS 1088251 O0 000 O0 0 6 1 1 4 RCNT PS2 CPS 1088251 O0 000 O0 0 6 1 1 4 RCFT PS2 CPS 1088251 O0 000 O0 0 6 1 1 4 CNTC PS2 CPS 1088251 O0 000 O0 0 6 1 1 4 CFTC PS2 CPS 1088251 O0 000 O0 0 6 1 1 4 NPOR PS2 PU 1088251 O0 000 O0 0 6 1 1 4 GR PS2 GAPI 1088251 O0 000 O0 0 6 1 1 4 TENS PS2 LB 1088251 O0 000 O0 0 6 1 1 4 CCL PS2 V 1088251 O0 000 O0 0 6 1 1 4 68 0000000000 68 0000000000 68 0000000000 68 0000000000 68 0000000000 68 0000000000 68 0000000000 68 0000000000 68 0000000000 68 0000000000 68 0000000000 68 0000000000 68 0000000000 68 0000000000 68 0000000000 68 0000000000 68 0000000000 68 0000000000 68 0000000000 ** DATA ** DEPT. 10209.000 NPHI.PS2 29.701 ENPH. PS2 TN~.PS2 3.032 RTNR.PS2 3.250 ENRA.PS2 CNEC. PS2 2258.229 RCEF. PS2 354.543 RCEN. PS2 RCFT. PS2 473.440 CNTC. PS2 1537.215 CFTC. PS2 GR.PS2 84.706 TENS.PS2 2467.000 CCL.PS2 44.434 TNPH. PS2 6.000 CFEC. PS2 1925.113 RCNT. PS2 519.993 NPOR.PS2 -0.022 27.971 376.355 1557.521 27.971 LIS Tape Verification Listing Schlumberger Alaska Computing Center 14-MAY-1998 15:26 PAGE: 21 DEPT. 9981.000 NPHI.PS2 TNRA.PS2 2.478 RTNR.PS2 CNEC. PS2 2699.316 RCEF. PS2 RCFT. PS2 836.447 CNTC. PS2 GR.PS2 29.644 TENS.PS2 19.923 ENPH. PS2 2.632 ENRA.PS2 526.460 RCEN. PS2 2176.969 CFTC. PS2 3325.000 CCL.PS2 29.464 TNPH. PS2 4.606 CFEC. PS2 2285.296 RCNT. PS2 911.135 NPOR.PS2 -999.250 19.678 586.106 2140.068 20.574 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .006 SERVICE : FLIC VERSION · O01CO1 DATE : 98/05/14 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .007 SERVICE : FLIC VERSION : O01CO1 DATE : 98/05/14 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER 7 RAW CURVES Curves and log header data for each pass in separate files; raw background pass in last file PASS NUMBER: 3 DEPTH INCREMENT: O. 5000 FILE S~Y VENDOR TOOL CODE START DEPTH CNTG 10209.5 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME LOGGER ON BOTTOM: TD DRILLER (FT) : TD LOGGER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : LOGGING SPEED (FPHR): STOP DEPTH 9975.0 31 -DEC-97 8C0-069 1200 31 -DEC-97 10196.0 10190.0 9980.0 10180.0 1800.0 LIS Tape Verification Listing Schlumberger Alaska Computing Center 14-MAY-1998 15:26 PAGE: 22 DEPTH CONTROL USED (YES/NO): TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE GR GAMFAA RAY CNTG COMPENSATED NEUTRON $ TOOL NUMBER ........... SGT-L CNT-GA BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLERS CASING DEPTH (FT): LOGGERS CASING DEPTH (FT): 10.500 BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE TEMPERATURE (DEGF) : BOTTOM HOLE TEMPERATURE (DEGF) : FLUID SALINITY (PPM) : FLUID LEVEL (FT) : FLUID RATE AT WELLHEAD (BPM) : WATER CUTS (PCT) : GAS~OIL RATIO: CHOKE (DEG) : PRODUCED FLUIDS NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): EPITHERMAL SANDSTONE 2.65 BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE TOP NORMALIZING WINDOW (FT) '. BASE NORMALIZING WINDOW (FT) : BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (CPS): 0 FAR COUNT RATE HIGH SCALE (CPS): 6000 NEAR COUNT RATE LOW SCALE (CPS): 0 NEAR COUNT RATE HIGH SCALE (CPS)'. 24000 TOOL STANDOFF (IN): REMARKS: TIED INTO GH CNL DATED 5/2/86 LOGGED THREE PASSES AT 1800 FPH ON SANDSTONE MATRIX PUMPED 260 BBLS CRUDE BEFORE LOGGING AND 2 BPM WHILE LOGGING GOC APPEARS TO BE AT 10153' TD TAGGED AT 10190' THIS FILE CONTAINS THE RAW DATA FOR PASS #3. $ LIS FORMAT DATA LIS Tape Verification Listing Schlumberger Alaska Computing Center 14-MAY-1998 15:26 PAGE: 23 ** DATA FORMAT SPECIFICATION RECORD ** * * SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 76 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 13 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERVUNIT SERVICE API API API API FILE NI~B NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 1088251 O0 000 O0 0 7 1 1 4 68 0000000000 NPHI PS3 PU 1088251 O0 000 O0 0 7 1 1 4 68 0000000000 ENPH PS3 PU 1088251 O0 000 O0 0 7 1 1 4 68 0000000000 TNPH PS3 PU 1088251 O0 000 O0 0 7 1 1 4 68 0000000000 TNRA PS3 1088251 O0 000 O0 0 7 1 1 4 68 0000000000 RTNR PS3 1088251 O0 000 O0 0 7 1 1 4 68 0000000000 ENRA PS3 1088251 O0 000 O0 0 7 1 1 4 68 0000000000 CFEC PS3 CPS 1088251 O0 000 O0 0 7 1 1 4 68 0000000000 CNEC PS3 CPS 1088251 O0 000 O0 0 7 1 1 4 68 0000000000 RCEF PS3 CPS 1088251 O0 000 O0 0 7 1 1 4 68 0000000000 RCEN PS3 CPS 1088251 O0 000 O0 0 7 1 1 4 68 0000000000 RCNT PS3 CPS 1088251 O0 000 O0 0 7 1 1 4 68 0000000000 RCFT PS3 CPS 1088251 O0 000 O0 0 7 1 1 4 68 0000000000 CNTC PS3 CPS 1088251 O0 000 O0 0 7 1 1 4 68 0000000000 CFTC PS3 CPS 1088251 O0 000 O0 0 7 1 1 4 68 0000000000 NPOR PS3 PU 1088251 O0 000 O0 0 7 1 1 4 68 0000000000 GR PS3 GAPI 1088251 O0 000 O0 0 7 1 1 4 68 0000000000 TENS PS3 LB 1088251 O0 000 O0 0 7 1 1 4 68 0000000000 CCL PS3 V 1088251 O0 000 O0 0 7 1 1 4 68 0000000000 ** DATA ** LIS Tape Verification Listing Schlumberger Alaska Computing Center 14-MAY-1998 15:26 PAGE: 24 DEPT. 10209.500 NPHI.PS3 TNRA.PS3 3.265 RTNR.PS3 CNEC. PS3 1854.807 RCEF. PS3 RCFT. PS3 480.550 CNTC.PS3 GR.PS3 134.328 TENS.PS3 DEPT. 9975.000 NPHI.PS3 TNRA. PS3 3.146 RTNR.PS3 CNEC. PS3 2697.107 RCEF. PS3 RCFT. PS3 462.492 CNTC.PS3 GR.PS3 121.422 TENS.PS3 33.953 ENPH. PS3 3.500 ENRA.PS3 480.550 RCEN. PS3 1683.048 CFTC.PS3 2431.000 CCL.PS3 31.775 ENPH. PS3 3.827 ENRA.PS3 443.887 RCEN. PS3 1917.446 CFTC.PS3 3382.000 CCL.PS3 20.735 TNPH. PS3 3.636 CFEC. PS3 1581.201 RCNT. PS3 527.802 NPOR.PS3 -0.007 38.659 TNPH. PS3 5.498 CFEC. PS3 2311.670 RCNT. PS3 565.513 NPOR.PS3 -999.250 31.551 510.114 1705.279 31.551 34.744 490.568 1707.279 40.423 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .007 SERVICE : FLIC VERSION : O01CO1 DATE : 98/05/14 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** TAPE TRAILER **** SERVICE NAME : EDIT DATE : 98/05/14 ORIGIN : FLIC TAPE NAME : 98230 CONTINUATION # : 1 PREVIOUS TAPE : CO~ff4ENT : ARCO ALASKA INC., PRUDHOE BAY, D.S. 1-13, API# 50-029-20270-00 **** REEL TRAILER **** SERVICE NAME : EDIT DATE : 98/05/14 ORIGIN : FLIC REEL NAME : 98230 CONTINUATION # : PREVIOUS REEL : COGENT : ARCO ALASKA INC., PRUDHOE BAY, D.S. 1-13, API# 50-029-20270-00 * ALASKA COMPUTING CENTER * ****************************** . ............................ * ....... SCHLUMBERGER ....... * ****************************** COMPANY NAME : ARCO ALASKA INC. WELL NAME : D. S. 1 - 13 FIELD NAME : PRUDHOE BAY BOROUGH : NORTH SLOPE STATE : ALASKA API i~UMBER : 500292027000 REFERENCE NO : 98192 LIS Tape Verification Listing Schlumberger Alaska Computing Center 17-APR-1998 08:14 PAGE: * * * * REEL HEADER * * * * SERVICE NAME : EDIT DATE : 98/04/17 ORIGIN : FLIC REEL NAME : 98192 CONTINUATION # PREVIOUS REEL : COMMENT : ARCO ALASKA INC., PRUDHOE BAY, D.S. 1-13, API# 50-029-20270-00 **** TAPE HEADER **** SERVICE NAME : EDIT DATE : 98/04/17 ORIGIN : FLIC TAPE NAME : 98192 CONTINUATION # : 1 PREVIOUS TAPE : CO~IENT : ARCO ALASKA INC., PRUDHOE BAY, D.S. 1-13, API# 50-029-20270-00 TAPE HEADER PRUDHOE BAY CASED HOLE WIRELINE LOGS WELL NAME: D.S. 1-13 API NUMBER: 500292027000 OPERATOR: ARCO ALASKA INC. LOGGING COMPANY: SCHLUMBERGER WELL SERVICES TAPE CREATION DATE: 17-APR-98 JOB NUMBER: 98192 LOGGING ENGINEER: J. PAWLUK OPERATOR WITNESS: G. SAUBER SURFACE LOCATION SECTION: 8 TOWNSHIP: 1 ON RANGE: 1SE FNL: FSL: 662 FEL: 733 FWL : ELEVATION (FT FROM MSL O) KELLY BUSHING: 73. O0 DERRICK FLOOR: GROUND LEVEL: 34. O0 WELL CASING RECORD OPEN HOLE CASING DRILLERS CASING BIT SIZE (IN) SIZE (IN) DEPTH (FT) WEIGHT (LB/FT) 1ST STRING 8. 500 9. 625 2ND STRING 3RD STRING PRODUCTION STRING CURVE SHIFT DATA - ALL PASSES TO STANDARD (MEASURED DEPTH) LIS Tape Verification Listing Schlumberger Alaska Computing Center 17-APR-1998 08:14 BASELINE CURVE FOR SHIFTS LDWG TOOL CODE: BCS LDWG CURVE CODE: GR RUN NUMBER: PASS NUMBER: DATE LOGGED: 23-0CT-77 LOGGING COMPANY: SCHLUMBERGER WELL SERVICES BASELINE DEPTH 88888.0 10172.5 10151.5 10149,0 10144.5 10133,5 10116.5 10116,0 10111,5 10109,0 10107 0 10103 5 10102 5 10101 5 10101 0 10096 0 10094,5 10089.0 10086,0 10080.0 10079,5 10076,0 10072.5 10064.0 10063.5 10059.5 10053.5 10052,5 10051.5 10051,0 10049,0 10046.0 10043,0 10041 0 10036 5 10034 0 10029 0 10028 5 10022,5 10020.0 10010.5 10009.5 10006,0 10005.5 9999.0 .......... EQUIVALENT UNSHIFTED DEPTH .......... GRCH CNTG 88886.5 88888.5 10150.0 10133.5 10116.0 10112.0 10108.0 10103.5 10100.5 10095.5 10094.5 10089.5 10081.5 10077.5 10074.5 10065.0 10059.5 10055.0 10052.5 10050.0 10044.5 10042.5 10040.0 10036.5 10034.0 10029.5 10022.5 10020.0 10009.5 10005.5 9998.5 10173.0 10150.0 10145.5 10133.5 10116.0 10112.0 10107.0 10103.5 10100.0 10095.5 10094.5 10088.5 10081.0 10077.5 10074.0 10065.0 10059.5 10054.5 10052.5 10050.0 10044.5 10042.5 10036.5 10034.0 10029.5 10022.5 10011.0 10005.5 9999.0 PAGE LIS Tape Verification Listing Schlumberger Alaska Computing Center 17-APR-1998 08:14 9990.0 9990.5 9988.5 9990.5 9985.5 9985.5 9986.0 9983.0 9983.5 9982.0 9983.5 9977.0 9978.0 9976.0 9975.5 9974.5 9975.0 9971.0 9971.0 9971.0 100.0 100.0 100.0 REMARKS: CONTAINED HEREIN IS THE LDWG FORMATTED CASED HOLE CNTG DATA AQUIRED ON ARCO ALASKA'S DS 1-13 WELL. THE DEPTH SHIFTS SHOWN ABOVE REFLECT CORRELATIONS BETWEEN GRCH PASS #1 AND THE BCS GAMMA RAY, ALSO PASS #1 ENPH AND THE BCS GA~flVA RAY, CARRYING ALL CNTG CURVES WITH THE ENPH SHIFTS. ENPH WAS USED INSTEAD OF NPHI BECAUSE THE NPHI DATA WAS INVALID ON PASSES 2 & 3 AS EXPLAINED IN THE FIELD COMMENTS. $ $ PAGE: **** FILE HEADER **** FILE NAME : EDIT .001 SERVICE · FLIC VERSION · O01CO1 DATE : 98/04/17 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NIIMBER: 1 EDITED CURVES Depth shifted and clipped curves for each pass in separate files. PASS NUMBER: 1 DEPTH INCREMENT: 0.5000 FILE SU~4ARY LDWG TOOL CODE START DEPTH STOP DEPTH GRCH 10171.5 9970.0 CNTG 10178.5 9970.0 $ CURVE SHIFT DATA - PASS TO PASS (MEASURED DEPTH) BASELINE CURVE FOR SHIFTS LDWG CURVE CODE: PASS NUMBER: .......... EQUIVALENT UNSHIFTED DEPTH .......... BASELINE DEPTH GRCH CNTG LIS Tape Verification Listing Schlumberger Alaska Computing Center 17-APR-1998 08:14 PAGE: REMARKS: THIS FILE CONTAINS CASED HOLE CNTG PASS #1. NO PASS TO PASS SHIFTS APPLIED TO THIS DATA. $ LIS FORMAT DATA THERE ARE ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB * * TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 68 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 15 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 0 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 1088245 O0 000 O0 0 1 1 1 4 68 0000000000 NPHI CNTG PU-S 1088245 O0 000 O0 0 1 1 1 4 68 0000000000 ENPH CNTG PU-S 1088245 O0 000 O0 0 1 1 1 4 68 0000000000 CPHI CNTG PU-S 1088245 O0 000 O0 0 1 1 1 4 68 0000000000 NRAT CNTG 1088245 O0 000 O0 0 1 1 1 4 68 0000000000 CRAT CNTG 1088245 O0 000 O0 0 1 1 1 4 68 0000000000 ENRA CNTG 1088245 O0 000 O0 0 1 1 1 4 68 0000000000 NCNT CNTG CPS 1088245 O0 000 O0 0 1 1 1 4 68 0000000000 FCNT CNTG CPS 1088245 O0 000 O0 0 1 1 1 4 68 0000000000 CNTC CNTG CPS 1088245 O0 000 O0 0 1 1 1 4 68 0000000000 CFTC CNTG CPS 1088245 O0 000 O0 0 1 1 1 4 68 0000000000 CNEC CNTG CPS 1088245 O0 000 O0 0 1 1 1 4 68 0000000000 CFEC CNTG CPS 1088245 O0 000 O0 0 1 1 1 4 68 0000000000 GRCH CNTG GAPI 1088245 O0 000 O0 0 1 1 1 4 68 0000000000 LIS Tape Verification Listing Schlumberger Alaska Computing Center 17-APR-1998 08:14 PAGE: NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) TENS CNTG LB 1088245 O0 000 O0 0 1 1 1 4 68 0000000000 CCL CNTG V 1088245 O0 000 O0 0 1 1 1 4 68 0000000000 GR BCS GAPI 1088245 O0 000 O0 0 1 1 1 4 68 0000000000 ** DATA ** DEPT. 10300.000 NPHI.CNTG -999.250 ENPH. CNTG -999.250 CPHI.CNTG NRAT. CNTG -999.250 CRAT. CNTG -999.250 ENRA.CNTG -999.250 NCNT. CNTG FCNT. CNTG -999.250 CNTC. CNTG -999.250 CFTC. CNTG -999.250 CNEC. CNTG CFEC. CNTG -999.250 GRCH. CNTG -999.250 TENS.CNTG -999.250 CCL.CNTG GR.BCS 36. 119 DEPT. 8198.000 NPHI.CNTG -999.250 ENPH. CNTG -999.250 CPHI.CNTG NRAT. CNTG -999.250 CRAT. CNTG -999.250 ENRA.CNTG -999.250 NCNT. CNTG FCNT. CNTG -999.250 CNTC. CNTG -999.250 CFTC. CNTG -999.250 CNEC. CNTG CFEC. CNTG -999.250 GRCH. CNTG -999.250 TENS. CNTG -999.250 CCL.CNTG GR.BCS 87.857 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .001 SERVICE : FLIC VERSION · O01CO1 DATE : 98/04/17 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .002 SERVICE : FLIC VERSION : O01CO1 DATE : 98/04/17 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER: 2 EDITED CURVES Depth shifted and clipped curves for each pass in separate files. LIS Tape Verification Listing Schlumberger Alaska Computing Center 17-APR-1998 08:14 PAGE: PASS NUMBER: 2 DEPTH INCREMENT: O. 5000 FILE SUM~IARY LDWG TOOL CODE START DEPTH STOP DEPTH GRCH 1 O172.5 9991 . 5 CNTG 10180.0 9991.0 $ CURVE SHIFT DATA - PASS TO PASS (MEASURED DEPTH) BASELINE CURVE FOR SHIFTS LDWG CURVE CODE: GRCH PASS NUMBER: 1 BASELINE DEPTH 88888.0 10175.0 10173.0 10170.5 10166.5 10164 0 10163 0 10160 0 10157 5 10157 0 10155 0 10153 5 10151.5 10151.0 10146.5 10144.0 10143.5 10141.0 10140.5 10135.5 10132.5 10130.5 10127.0 10126.0 10123.5 10121.0 10118.0 10116.0 10115.5 10112.5 10112.0 10101.0 10100.0 10094.5 10092.5 10092.0 10088.5 .......... EQUIVALENT UNSHIFTED DEPTH GRCH CNTG 88887.5 88890.0 10170.0 10162.5 10159.0 10156.5 10153.5 10150.5 10145.5 10143.5 10140.0 10134.0 10128.5 10125.5 10121.5 10118.0 10116.0 10111.5 10100.5 10095.5 10093.0 10089.5 10177.0 10173.5 10167.5 10164.5 10159.0 10154.0 10150.5 10145.0 10141.5 10133.5 10131.0 10128.5 10125.0 10121.5 10118.0 10116.0 10112.5 10102.5 10095.5 10091.0 10089.5 LIS Tape Verification Listing Schlumberger Alaska Computing Center 17-APR-1998 08:14 PAGE: 10085.0 10082.5 10081.0 10079.5 10076.0 10074.5 10073.0 10068.0 10067.0 10063.5 10059.5 10056.0 10054.5 10051.0 10050.0 10048.5 10044.5 10043.0 10040 0 10037 0 10033 5 10031 0 10028 5 10025 0 10024 0 10020 5 10019 0 10018 0 10014 5 10010.0 10008.0 10006.5 10005.5 9998.0 9994.5 9994.0 9991.5 100.0 $ 10086.5 10082. 0 10077.5 10074.5 10068.5 10059.5 10056.5 10055.5 10052.5 10048.5 10043.0 10040.0 10036.5 10034.0 10029.5 10025.0 10019.5 10018.5 10017.0 10009.5 10006.0 9998.5 10083.5 10081.0 10075.5 10068.0 10063.0 10049.0 10043.5 10028.0 10023.5 10020.0 10011.0 10006.0 9999.0 9996.0 9996.0 9993.0 9992.5 101.5 101.0 REMARKS: THIS FILE CONTAINS CASED HOLE CNTG PASS #2. THE DEPTH SHIFTS SHOWN ABOVE REFLECT CORRELATIONS BETWEEN GRCH PASS #2 AND GRCH PASS #1, ALSO ENPH PASS #2 AND ENPH PASS #1, CARRYING ALL CNTG CURVES WITH THE ENPH SHIFTS. $ LIS FORMAT DATA LIS Tape Verification Listing Schlumberger Alaska Computing Center 17-APR-1998 08:14 PAGE: ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB * * TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 64 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 16 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN * * NAME SERV UNIT SERVICE API API API API FILE NUMB NO~B SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) O0 000 O0 0 2 1 1 4 68 0000000000 DEPT FT 1088245 NPHI CNTG PU-S 1088245 O0 000 O0 0 2 1 1 4 68 0000000000 ENPH CNTG PU-S 1088245 O0 000 O0 0 2 1 1 4 68 0000000000 CPHI CNTG PU-S 1088245 O0 000 O0 0 2 1 1 4 68 0000000000 NRAT CNTG 1088245 O0 000 O0 0 2 1 1 4 68 0000000000 CRAT CNTG 1088245 O0 000 O0 0 2 1 1 4 68 0000000000 ENRA CNTG 1088245 O0 000 O0 0 2 1 1 4 68 0000000000 NCNT CNTG CPS 1088245 O0 000 O0 0 2 1 1 4 68 0000000000 FCNT CNTG CPS 1088245 O0 000 O0 0 2 1 1 4 68 0000000000 CNTC CNTG CPS 1088245 O0 000 O0 0 2 1 1 4 68 0000000000 CFTC CNTG CPS 1088245 O0 000 O0 0 2 1 1 4 68 0000000000 CNEC CNTG CPS 1088245 O0 000 O0 0 2 1 1 4 68 0000000000 CFEC CNTG CPS 1088245 O0 000 O0 0 2 1 1 4 68 0000000000 GRCH CNTG GAPI 1088245 O0 000 O0 0 2 1 1 4 68 0000000000 TENS CNTG LB 1088245 O0 000 O0 0 2 1 1 4 68 0000000000 CCL CNTG V 1088245 O0 000 O0 0 2 1 1 4 68 0000000000 * * DA TA * * DEPT. 10180.000 NPHI.CNTG 54.281 ENPH. CNTG 36.507 CPHI.CNTG NRAT. CNTG 5.219 CRAT. CNTG 4.380 ENRA.CNTG 5.307 NCNT. CNTG FCNT. CNTG 603.124 CNTC. CNTG 2648.161 CFTC. CNTG 609.188 CNEC. CNTG CFEC. CNTG 435.075 GRCH. CNTG -999.250 TENS. CNTG 3197.000 CCL.CNTG 52.096 2476.701 2309.051 0.051 LIS Tape Verification Listing Schlumberger Alaska Computing Center 17-APR-1998 08:14 PAGE: DEPT. 9991.000 NPHI. CNTG 75.037 ENPH. CNTG ~T. CNTG 5.418 CRAT. CNTG 5.519 ENRA.CNTG FClTT. CNTG 932.549 CN~fC. CNTG 6435.653 CFTC. CNTG CFEC. CNTG 674.282 GRCH. CNTG -999.250 TENS.CNTG 25.273 CPHI.CNTG 4.156 NCNT. CNTG 1052.503 CNEC. CNTG 3096.000 CCL.CNTG 193.785 6711.156 2802.347 -0.011 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .002 SERVICE : FLIC VERSION : O01CO1 DATE : 98/04/17 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .003 SERVICE : FLIC VERSION : O01CO1 DATE : 98/04/17 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER: 3 EDITED CURVES Depth shifted and clipped curves for each pass in separate files. PASS NUMBER: 3 DEPTH INCREMENT: 0.5000 FILE S~Y LDWG TOOL CODE START DEPTH STOP DEPTH GRCH 10170.0 9990.0 CNTG 10178.5 9989.5 $ CURVE SHIFT DATA - PASS TO PASS (MEASURED DEPTH) BASELINE CURVE FOR SHIFTS LDWG CURVE CODE: GRCH PASS NUMBER: 1 BASELINE DEPTH .......... EQUIVALENT UNSHIFTED DEPTH GRCH CNTG LIS Tape Verification Listing Schlumberger Alaska Computing Center 17-APR-1998 08:14 PAGE: 10 88888.0 88885.0 88888.5 10176.5 10177.0 10174.0 10173.0 10171.0 10171.0 10169.5 10166.5 10166.5 10164.0 10166.0 10162.0 10161.5 10159.0 10156.5 10156.5 10153.0 10150.0 10147.5 10145.0 10147.0 10142.5 10140.0 10139.0 10137.5 10135.5 10133.5 10134.0 10134.0 10131.5 10131.5 10131.0 10130.5 10127.5 10125.5 10125.5 10123.5 10122.5 10121.0 10121.0 10119.0 10118.0 10117.5 10116.0 10115.0 10112.5 10112.5 10104.0 10103.0 10103 . 0 10100.5 10100.5 10100.5 10099.0 10099.5 10099.5 10096.0 10095.5 10092.5 10091.5 10091.5 10091 . 0 10088.5 10089.0 10087.5 10089.5 10080.5 10081.5 10081.5 10078.0 10077.5 10077.5 10074.0 10074.5 10074.5 10067.5 10068.5 10065.5 10065.5 10060.5 10059.5 10059.5 10057.5 10056.5 10055.5 10055.0 10053.0 10053.0 10051 . 0 10051.5 10046.5 10043.5 10046.0 10043.5 10044.5 10040.5 10041.5 10040.0 10038.0 10036.5 10035.5 10034.0 10033.0 10032.0 10031 . 5 10030.5 10029.5 10029.5 10028.0 10028.0 10026.0 10025.5 10024.0 10022.5 10021.0 10019.5 10019.5 10019.0 LIS Tape Verification Listing Schlumberger Alaska Computing Center 17-APR-1998 08:14 PAGE: 11 10018.0 10016.5 10020.0 10014.5 10013.5 10014.0 10016.0 10007.5 10006.0 10006.0 10005.5 10000.0 9998.5 9999.5 9999.0 9997.0 9996.5 9996.5 9997.5 9993.0 9993.0 9992.5 100.0 100.0 99.5 $ REMARKS: THIS FILE CONTAINS CASED HOLE CNTG PASS #3. THE DEPTH SHIFTS SHOWN ABOVE REFLECT CORRELATIONS BETWEEN GRCH PASS #3 AND GRCH PASS #1, ALSO ENPH PASS #3 AND ENPH PASS #1, CARRYING ALL CNTG CURVES WITH THE ENPH SHIFTS. $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 64 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 16 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 1088245 O0 000 O0 0 3 1 1 4 68 0000000000 NPHI CNTG PU-S 1088245 O0 000 O0 0 3 1 1 4 68 0000000000 LIS Tape Verification Listing Schlumberger Alaska Computing Center 17-APR-1998 08:14 PAGE: 12 NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) ENPH CNTG PU-S 1088245 O0 000 O0 0 3 1 1 4 68 0000000000 CPHI CNTG PU-S 1088245 O0 000 O0 0 3 1 1 4 68 0000000000 NRAT CNTG 1088245 O0 000 O0 0 3 1 1 4 68 0000000000 CRAT CNTG 1088245 O0 000 O0 0 3 1 1 4 68 0000000000 ENRA CNTG 1088245 O0 000 O0 0 3 1 1 4 68 0000000000 NCNT CNTG CPS 1088245 O0 000 O0 0 3 1 1 4 68 0000000000 FCNT CNTG CPS 1088245 O0 000 O0 0 3 1 1 4 68 0000000000 CNTC CNTG CPS 1088245 O0 000 O0 0 3 1 1 4 68 0000000000 CFTC CNTG CPS 1088245 O0 000 O0 0 3 1 1 4 68 0000000000 CNEC CNTG CPS 1088245 O0 000 O0 0 3 1 1 4 68 0000000000 CFEC CNTG CPS 1088245 O0 000 O0 0 3 1 1 4 68 0000000000 GRCH CNTG GAPI 1088245 O0 000 O0 0 3 1 1 4 68 0000000000 TENS CNTG LB 1088245 O0 000 O0 0 3 1 1 4 68 0000000000 CCL CNTG V 1088245 O0 000 O0 0 3 1 1 4 68 0000000000 ** DATA ** DEPT. 10178.500 NPHI.CNTG 401.351 ENPH. CNTG 38.428 CPHI.CNTG NRAT. CNTG 25.443 CRAT. CNTG 23.419 ENRA.CNTG 5.477 NCNT. CNTG FCNT. CNTG 593.477 CNTC. CNTG 12318.238 CFTC. CNTG 636.663 CNEC. CNTG CFEC. CNTG 449.556 GRCH. CNTG -999.250 TENS. CNTG 3164.000 CCL.CNTG DEPT. 9989.500 NPHI.CNTG 103.312 ENPH. CNTG 24.844 CPHI.CNTG NRAT. CNTG 7.017 CRAT. CNTG 7.070 ENRA.CNTG 4.108 NCNT. CNTG FCNT. CNTG 982.746 CNTC. CNTG 8434.395 CFTC. CNTG 1070.673 CNEC. CNTG CFEC. CNTG 665.981 GRCH. CNTG -999.250 TENS. CNTG 3170.000 CCL.CNTG 33567.563 13486.633 2462.201 0.062 595.607 10552.539 2736.145 0.627 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .003 SERVICE : FLIC VERSION : O01CO1 DATE : 98/04/17 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : LIS Tape Verification Listing Schlumberger Alaska Computing Center 17-APR-1998 08:14 PAGE: 13 **** FILE HEADER **** FILE NAME : EDIT .004 SERVICE - FLIC VERSION : O01CO1 DATE : 98/04/17 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER: 4 AVERAGED CURVES Compensated Neutron: Arithmetic average of edited passes for all curves. DEPTH INCREMENT O. 5000 PASSES INCLUDED IN AVERAGE LDWG TOOL CODE PASS NUMBERS 1, 2, 3, CNTG $ REMARKS: THIS FILE CONTAINS THE ARITH~4ETIC AVERAGE OF PASSES 1,2, &3.THE DATA WAS CLIPPED AND DEPTH SHIFTED BEFORE THE AVERAGE WAS CALCULATED. $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 56 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 18 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 LIS Tape Verification Listing Schlumberger Alaska Computing Center 17-APR-1998 08:14 PAGE: 14 ** SET TYPE - CHAN ** NAME SERVUNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 1088245 O0 000 O0 0 4 1 1 4 68 0000000000 NPHI CNAV PU-S 1088245 O0 000 O0 0 4 1 1 4 68 0000000000 NRAT CNAV 1088245 O0 000 O0 0 4 1 1 4 68 0000000000 CPHI CNAV PU-S 1088245 O0 000 O0 0 4 1 1 4 68 0000000000 CP~T CNAV 1088245 O0 000 O0 0 4 1 1 4 68 0000000000 ENPH CNAV PU-S 1088245 O0 000 O0 0 4 1 1 4 68 0000000000 ENRA CNAV 1088245 O0 000 O0 0 4 1 1 4 68 0000000000 NCNT CNAV CPS 1088245 O0 000 O0 0 4 1 1 4 68 0000000000 FCNT CNAV CPS 1088245 O0 000 O0 0 4 1 1 4 68 0000000000 CNTC CNAV CPS 1088245 O0 000 O0 0 4 1 1 4 68 0000000000 CFTC CNAV CPS 1088245 O0 000 O0 0 4 1 1 4 68 0000000000 CNEC CNAV CPS 1088245 O0 000 O0 0 4 1 1 4 68 0000000000 CFEC CNAV CPS 1088245 O0 000 O0 0 4 1 1 4 68 0000000000 GRCH CNTG GAPI 1088245 O0 000 O0 0 4 1 1 4 68 0000000000 ** DATA ** DEPT. 10178.500 NPHI.CNAV 164.698 NRAT. CNAV 11.265 CPHI.CNAV CRAT. CNAV 10.437 ENPH. CNAV 35.636 ENRA.CNAV 5.214 NCNT. CNAV FCNT. CNAV 581.478 CNTC. CNAV 5750.812 CFTC. CNAV 624.052 CNEC. CNAV CFEC. CNAV 452.671 GRCH. CNTG -999.250 DEPT. 9970.000 NPHI. CNAV -999.250 NRAT. CNAV CRAT. CNAV -999.250 ENPH. CNAV -999.250 ENRA.CNAV FCNT. CNAV -999.250 CNTC. CNAV -999.250 CFTC. CNAV CFEC. CNAV -999.250 GRCH. CNTG 58.958 -999. 250 CPHI. CNAV - 999. 250 NCNT. CNAV -999. 250 CNEC. CNAV 11219.426 6162.741 2359.528 -999.250 -999.250 -999.250 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .004 SERVICE : FLIC VERSION : O01CO1 DATE : 98/04/17 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE LIS Tape Verification Listing Schlumberger Alaska Computing Center 17-APR-1998 08:14 PAGE: 15 **** FILE HEADER **** FILE NAME : EDIT .005 SERVICE : FLIC VERSION : O01CO1 DATE : 98/04/17 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER 5 RAW CURVES Curves and log header data for each pass in separate files; raw background pass in last file PASS NUMBER: 1 DEPTH INCREMENT: 0.5000 FILE SOW~4ARY VENDOR TOOL CODE START DEPTH CNTG 10208.0 $ LOG HEADER DATA STOP DEPTH 9966.5 DATE LOGGED: SOFTWARE VERSION: TIME LOGGER ON BOTTOM: TD DRILLER (FT) : TD LOGGER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : LOGGING SPEED (FPHR) : DEPTH CONTROL USED (YES/NO) '. TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE ......................... GR GAiVk4A RAY CNTG COMPENSATED NEUTRON BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN) DRILLERS CASING DEPTH (FT) LOGGERS CASING DEPTH (FT) BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE TEMPERATURE (DEGF) : BOTTOM HOLE TEMPERATURE (DEGF) : FLUID SALINITY (PPM) : FLUID LEVEL (FT) : 24-DEC-97 8C0-069 1842 24-DEC-97 10240.0 10240.0 9970.0 10178.0 1800.0 TOOL NUMBER SGC - SA CNT-G 8.500 CRUDE LIS Tape Verification Listing Schlumberger Alaska Computing Center 17-APR-1998 08:14 PAGE: 16 FLUID RATE AT WELLHEAD (BPM) : WATER CUTS (PCT) : GAS~OIL RATIO: CHOKE (DEG) : NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): EPITHERMAL SAArD STONE 2.65 BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE TOP NORMALIZING WINDOW (FT) : BASE NORMALIZING WINDOW (FT) : BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (CPS): 0 FAR COUNT RATE HIGH SCALE (CPS): 6400 NEAR COUNT RATE LOW SCALE (CPS): 0 NEAR COUNT RATE HIGH SCALE (CPS): 24000 TOOL STANDOFF (IN): REMARKS: TIED INTO SWS BHCS DATED 10/23/77 LOGGED FROM TD TO 10000' WAS NOT ABLE TO DETERMINE GOC NEAR THERMAL DETECTOR FAILED AT THE END OF THE FIRST RUN LOGGED ON SNADSTONE MATRIX TD TAGGED AT 10190'. THIS FILE CONTAINS THE RAW DATA FOR PASS #1. $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 76 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 13 12 68 13 66 0 14 65 FT LIS Tape Verification Listing Schlumberger Alaska Computing Center 17-APR-1998 08:14 PAGE: 17 TYPE REPR CODE VALUE 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 1088245 O0 000 O0 0 5 1 1 4 68 0000000000 NPHI PS1 PU 1088245 O0 000 O0 0 5 1 1 4 68 0000000000 ENPH PS1 PU 1088245 O0 000 O0 0 5 1 1 4 68 0000000000 TNPH PS1 PU 1088245 O0 000 O0 0 5 1 1 4 68 0000000000 TNRA PSl 1088245 O0 000 O0 0 5 1 1 4 68 0000000000 RTNR PS1 1088245 O0 000 O0 0 5 1 1 4 68 0000000000 ENRA PS1 1088245 O0 000 O0 0 5 1 1 4 68 0000000000 CFEC PS1 CPS 1088245 O0 000 O0 0 5 1 1 4 68 0000000000 CNEC PS1 CPS 1088245 O0 000 O0 0 5 1 1 4 68 0000000000 RCEF PS1 CPS 1088245 O0 000 O0 0 5 1 1 4 68 0000000000 RCEN PS1 CPS 1088245 O0 000 O0 0 5 1 1 4 68 0000000000 RCNT PS1 CPS 1088245 O0 000 O0 0 5 1 1 4 68 0000000000 RCFT PS1 CPS 1088245 O0 000 O0 0 5 1 1 4 68 0000000000 CNTC PS1 CPS 1088245 O0 000 O0 0 5 1 1 4 68 0000000000 CFTC PS1 CPS 1088245 O0 000 O0 0 5 1 1 4 68 0000000000 NPOR PS1 PU 1088245 O0 000 O0 0 5 1 1 4 68 0000000000 GR PS1 GAPI 1088245 O0 000 O0 0 5 1 1 4 68 0000000000 TENS PS1 LB 1088245 O0 000 O0 0 5 1 1 4 68 0000000000 CCL PS1 V 1088245 O0 000 O0 0 5 1 1 4 68 0000000000 ** DATA ** DEPT. 10208.000 NPHI.PS1 35.502 ENPH. PS1 20.210 TNPH. PS1 TNRA.PS1 3.350 RTNR.PS1 3.500 ENRA.PS1 3.574 CFEC.PS1 CNEC. PS1 2008.133 RCEF. PS1 480.550 RCEN. PS1 1705.279 RCNT. PS1 RCFT. PS1 480.550 CNTC. PS1 1681.399 CFTC. PSI 513.497 NPOR.PS1 GR.PS1 85.970 TENS.PSi 2321.000 CCL.PS1 -0.018 DEPT. 9966.500 NPHI.PS1 73.189 ENPH. PS1 37.373 TNPH. PS1 TNRA.PS1 5.417 RTNR.PS1 6.897 ENRA.PS1 5.380 CFEC.PS1 CNEC. PS1 2895.629 RCEF. PS1 392.792 RCEN. PS1 2317.809 RCNT. PS1 RCFT.PS1 563.192 CNTC. PS1 4378.187 CFTC. PSi 701.943 NPOR.PS1 GR.PS1 55.259 TENS.PSi 3108.000 CCL.PS1 -999.250 32.895 561.949 1705.279 32.895 211.619 838.199 5171.875 184.832 ** END OF DATA ** LIS Tape Verification Listing Schlumberger Alaska Computing Center 17-APR-1998 08:14 PAGE: 18 **** FILE TRAILER **** FILE NAME : EDIT .005 SERVICE · FLIC VERSION . O01CO1 DATE : 98/04/17 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .006 SERVICE : FLIC VERSION : O01CO1 DATE : 98/04/17 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE iVTJMBER 6 RAW CURVES Curves and log header data for each pass in separate files; raw background pass in last file PASS NUMBER: 2 DEPTH INCREMENT: 0. 5000 FILE SUNFLARY VENDOR TOOL CODE START DEPTH CNTG 10210. 0 $ LOG HEADER DATA STOP DEPTH .......... 9988.0 DATE LOGGED: SOFTWARE VERSION: TIME LOGGER ON BOTTOM: TD DRILLER (FT) : TD LOGGER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : LOGGING SPEED (FPHR) : DEPTH CONTROL USED (YES/NO): TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE GR GAM~A RAY CNTG COMPENSATED NEUTRON $ BOREHOLEAND CASING DATA OPEN HOLE BIT SIZE (IN): 24-DEC-97 8C0-069 1842 24-DEC-97 10240.0 10240.0 9970.0 10178.0 1800.0 TOOL NUMBER SGC-SA CNT-G 8.500 LIS Tape Verification Listing Schlumberger Alaska Computing Center 17-APR-1998 08:14 PAGE: 19 DRILLERS CASING DEPTH (FT) : LOGGERS CASING DEPTH (FT) : BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE TEMPERATURE (DEGF) : BOTTOM HOLE TEMPERATURE (DEGF) : FLUID SALINITY (PPM) : FLUID LEVEL (FT) : FLUID RATE AT WELLHEAD (BPM) : WATER CUTS (PCT) : GAS~OIL RATIO: CHOKE (DEG) : CRUDE NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN) '. EPITHERMAL SANDSTONE 2.65 BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE TOP NORMALIZING WINDOW (FT) BASE NORMALIZING WINDOW (FT) : BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (CPS): 0 FAR COUNT RATE HIGH SCALE (CPS): 6400 NEAR COUNT RATE LOW SCALE (CPS): 0 NEAR COUNT RATE HIGH SCALE (CPS): 24000 TOOL STANDOFF (IN): REMARKS: TIED INTO SWS BHCS DATED 10/23/77 LOGGED FROM TD TO 10000' WAS NOT ABLE TO DETERMINE GOC NEAR THERMAL DETECTOR FAILED AT THE END OF THE FIRST RUN LOGGED ON SNADSTONE MATRIX TD TAGGED AT 10190'. THIS FILE CONTAINS THE RAW DATA FOR PASS #2. $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** .............................. TYPE REPR CODE VALUE .............................. 1 66 0 2 66 0 3 73 76 LIS Tape Verification Listing Schlumberger Alaska Computing Center 17-APR-1998 08:14 PAGE: 2O TYPE REPR CODE VALUE 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 13 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 1088245 O0 000 O0 0 6 1 1 4 68 0000000000 NPHI PS2 PU 1088245 O0 000 O0 0 6 1 1 4 68 0000000000 ENPH PS2 PU 1088245 O0 000 O0 0 6 1 1 4 68 0000000000 TNPH PS2 PU 1088245 O0 000 O0 0 6 1 1 4 68 0000000000 TNRA PS2 1088245 O0 000 O0 0 6 1 1 4 68 0000000000 RTNR PS2 1088245 O0 000 O0 0 6 1 1 4 68 0000000000 ENRA PS2 1088245 O0 000 O0 0 6 1 1 4 68 0000000000 CFEC PS2 CPS 1088245 O0 000 O0 0 6 1 1 4 68 0000000000 CNEC PS2 CPS 1088245 O0 000 O0 0 6 1 1 4 68 0000000000 RCEF PS2 CPS 1088245 O0 000 O0 0 6 1 1 4 68 0000000000 RCEN PS2 CPS 1088245 O0 000 O0 0 6 1 1 4 68 0000000000 RCNT PS2 CPS 1088245 O0 000 O0 0 6 1 1 4 68 0000000000 RCFT PS2 CPS 1088245 O0 000 O0 0 6 1 1 4 68 0000000000 CNTC PS2 CPS 1088245 O0 000 O0 0 6 1 1 4 68 0000000000 CFTC PS2 CPS 1088245 O0 000 O0 0 6 1 1 4 68 0000000000 NPOR PS2 PU 1088245 O0 000 O0 0 6 1 1 4 68 0000000000 GR PS2 GAPI 1088245 O0 000 O0 0 6 1 1 4 68 0000000000 TENS PS2 LB 1088245 O0 000 O0 0 6 1 1 4 68 0000000000 CCL PS2 V 1088245 O0 000 O0 0 6 1 1 4 68 0000000000 ** DATA ** DEPT. 10210.000 NPHI.PS2 172.185 ENPH. PS2 27.756 TNPH. PS2 TNRA.PS2 10.848 RTNR.PS2 11.333 ENRA.PS2 4.426 CFEC. PS2 CNEC. PS2 1890.765 RCEF. PS2 365.337 RCEN. PS2 1605.612 RCNT. PS2 RCFT. PS2 365.337 CNTC. PS2 4271.211 CFTC. PS2 390.385 NPOR.PS2 GR.PS2 92.727 TENS.PS2 1991.000 CCL.PS2 -0.039 2560.589 427.220 4331.872 2560.589 LIS Tape Verification Listing Schlumberger Alaska Computing Center 17-APR-1998 08:14 PAGE: 21 DEPT. 9988.000 NPHI.PS2 TNRA.PS2 6.203 RTNR.PS2 CNEC. PS2 2844.866 RCEF. PS2 RCFT. PS2 1022.652 CNTC. PS2 GR.PS2 20.299 TENS.PS2 87.509 ENPH. PS2 6.896 ENRA.PS2 568.723 RCEN. PS2 6720.909 CFTC. PS2 3107.000 CCL.PS2 24.429 TNPH. PS2 4.062 CFEC. PS2 2437.910 RCNT. PS2 1073.769 NPOR.PS2 -999.250 214.941 700.354 6332.998 229.317 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .006 SERVICE : FLIC VERSION : O01CO1 DATE : 98/04/17 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE **** FILE HEADER **** FILE NAME : EDIT .007 SERVICE : FLIC VERSION : O01CO1 DATE : 98/04/17 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HE~29ER FILENUMBER 7 RAW CURVES Curves and log header data for each pass in separate files; raw background pass in last file PASS NUMBER .. 3 DEPTH INCREMENT: O . 5000 FILE SU~mL~RY VENDOR TOOL CODE START DEPTH CNTG 10208.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME LOGGER ON BOTTOM: TD DRILLER (FT) : TD LOGGER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : LOGGING SPEED (FPHR): STOP DEPTH 9986.5 24 -DEC- 97 8C0-069 1842 24-DEC-97 10240.0 10240.0 9970.0 10178.0 1800.0 LIS Tape Verification Listing Schlumberger Alaska Computing Center 17-APR-1998 08:14 PAGE: 22 DEPTH CONTROL USED (YES/NO) : TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE GR GAMMA RAY CNTG COMPENSATED NEUTRON $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN) DRILLERS CASING DEPTH (FT) LOGGERS CASING DEPTH (FT) BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE TEMPERATURE (DEGF) : BOTTOM HOLE TEMPERATURE (DEGF) : FLUID SALINITY (PPM) : FLUID LEVEL (FT) : FLUID RATE AT WELLHEAD (BPM) : WATER CUTS (PCT) : GAS~OIL RATIO: CHOKE (DEG) : TOOL NUMBER SGC-SA CNT-G 8.500 CRUDE NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL) : MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): EP I THERMAL SANDSTONE 2.65 BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE TOP NORMALIZING WINDOW (FT) : BASE NORMALIZING WINDOW (FT): BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (CPS): 0 FAR COUNT RATE HIGH SCALE (CPS): 6400 NEAR COUNT RATE LOW SCALE (CPS): 0 NEAR COUNT RATE HIGH SCALE (CPS): 24000 TOOL STANDOFF (IN): RE~RKS: TIED INTO SWS BHCS DATED 10/23/77 LOGGED FROM TD TO 10000' WAS NOT ABLE TO DETERMINE GOC NEAR THERMAL DETECTOR FAILED AT THE END OF THE FIRST RUN LOGGED ON SNADSTONE MATRIX TD TAGGED AT 10190'. THIS FILE CONTAINS THE RAW DATA FOR PASS #3. $ LIS FORMAT DATA LIS Tape Verification Listing Schlumberger Alaska Computing Center 17-APR-1998 08:14 PAGE: 23 ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 76 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 13 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 1088245 O0 000 O0 0 7 1 1 4 68 0000000000 NPHI PS3 PU 1088245 O0 000 O0 0 7 1 1 4 68 0000000000 ENPH PS3 PU 1088245 O0 000 O0 0 7 1 1 4 68 0000000000 TNPH PS3 PU 1088245 O0 000 O0 0 7 1 1 4 68 0000000000 TNRA PS3 1088245 O0 000 O0 0 7 1 1 4 68 0000000000 RTNR PS3 1088245 O0 000 O0 0 7 1 1 4 68 0000000000 ENRA PS3 1088245 O0 000 O0 0 7 1 1 4 68 0000000000 CFEC PS3 CPS 1088245 O0 000 O0 0 7 1 1 4 68 0000000000 CNEC PS3 CPS 1088245 O0 000 O0 0 7 1 1 4 68 0000000000 RCEF PS3 CPS 1088245 O0 000 O0 0 7 1 1 4 68 0000000000 RCEN PS3 CPS 1088245 O0 000 O0 0 7 1 1 4 68 0000000000 RCNT PS3 CPS 1088245 O0 000 O0 0 7 1 1 4 68 0000000000 RCFT PS3 CPS 1088245 O0 000 O0 0 7 1 1 4 68 0000000000 CNTC PS3 CPS 1088245 O0 000 O0 0 7 1 1 4 68 0000000000 CFTC PS3 CPS 1088245 O0 000 O0 0 7 1 1 4 68 0000000000 NPOR PS3 PU 1088245 O0 000 O0 0 7 1 1 4 68 0000000000 GR PS3 GAPI 1088245 O0 000 O0 0 7 1 1 4 68 0000000000 TENS PS3 LB 1088245 O0 000 O0 0 7 1 1 4 68 0000000000 CCL PS3 V 1088245 O0 000 O0 0 7 1 1 4 68 0000000000 ** DATA ** LIS Tape Verification Listing Schlumberger Alaska Computing Center 17-APR-1998 08:14 PAGE: 24 DEPT. 10208.000 NPHI.PS3 TNRA.PS3 11.247 RTNR.PS3 CNEC. PS3 2008.133 RCEF. PS3 RCFT. PS3 480.550 CNTC. PS3 GR.PS3 75.224 TENS.PS3 DEPT. 9986.500 NPHI.PS3 TNRA.PS3 6.698 RTNR.PS3 CNEC. PS3 2731.423 RCEF. PS3 RCFT. PS3 929.381 CNTC. PS3 GR.PS3 28.182 TENS.PS3 179.456 ENPH. PS3 11.750 ENRA.PS3 239.538 RCEN. PS3 5925.763 CFTC. PS3 2308.000 CCL.PS3 96.529 ENPH. PS3 7.082 ENRA.PS3 500.237 RCEN. PS3 7041.175 CFTC.PS3 3122.000 CCL.PS3 59.918 TNPH.PS3 7.169 CFEC. PS3 1705.279 RCNT. PS3 513.497 NPOR.PS3 -0.001 27.451 TNPH. PS3 4.393 CFEC. PS3 2296.117 RCNT. PS3 1015.215 NPOR.PS3 -999.250 3251.582 280.113 6009.923 3251.583 338.960 621.747 7041.222 343.092 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .007 SERVICE : FLIC VERSION : O01CO1 DATE : 98/04/17 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE **** TAPE TRAILER **** SERVICE NAME : EDIT DATE : 98/04/17 ORIGIN : FLIC TAPE NAME : 98192 CONTINUATION # : 1 PREVIOUS TAPE : COGENT : ARCO ALASKA INC., PRUDHOE BAY, D.S. 1-13, API# 50-029-20270-00 **** REEL TRAILER **** SERVICE NAME : EDIT DATE : 98/04/17 ORIGIN : FLIC REEL NAME : 98192 CONTINUATION # : PREVIOUS REEL : CO~IENT : ARCO ALASKA INC., PRUDHOE BAY, D.S. 1-13, API# 50-029-20270-00 '_. I I IL II I[11 I II J.._ll! IIII II i il ii II I . _ iii ill_ , , , , * , * ****************************************************************************** -- - I_ IL_ - _ - - i.ilii - · · ii __ . - - - ~ ............ ~ ......... ~% ii I · _ i ii i ii ii illl ii i . ** 1NFr'R'~t:Tlnh RFCOR~G %* I',~TT TYPE CAT~ SIZE CODE 00o 000 ol6 065 ,Jo0 00O 015 065 un~ 000 011 065 oho 000 011 065 000 000 OOb 065 OeO OOO 004 065 ENTRY In R~I~F{{ ~ t~Ot; 'l'YP~ Cb~S~ ~B[) NO. LEVEb Ct)O~ D E P T F 'f 0 O d 0 n 4 O 1 b 8 GR TI~T CAPI 51 Sl 32 0 o 4 0 1 b8 mDT TDT q"DT TDT TDq~ TDT TDT T DT 0 4 0 o 4 0 0 4 0 0 4 0 0 4 0 o 4 0 0 4 0 n ' 4 0 n 4 0 0 4 0 n 4 0 0 4 0 n 4 0 o 4 0 n 4 0 0 4 0 0 4 0 n 4 0 1 68 1 68 t 68 1 68 1 bB 1 6~ 1 68 I 68 1 68 I b8 I 6~ I 6t) 1 6~ 1 60 I 6(I FSI(; WSTG FSTG FSTG OEPT FSTG FSTG FSTG FSTG FSIG FSTG DEnT FSTG FSTG WSTG DEPT WSTG FSTG -990.q50o CR -090o~500 GR -qgg. PsO0 106q0 nooo 24.:o531 24.1004 23.06~5 23 fl2nl 23:4844 lg.31?b Cg 10.K469 CE lO.lOq4 CR 20,9511 Ct{ 19.5,.,75 1o. E469 GR 10.o06~ Ck lc} ~562 C~ 10.31~5 17.39nb C~ 17.qlS6 C~ -999.2500 -090.2500 -99q.7500 -099.7500 24.1',875 25.2813 31.7344 }1.8437 ]1,343g !&.q~44 1~.64~0 21..7656 20.6250 ll.?~ql 14,&1.72 16.q219 2n. Sb25 2n,~2~0 14.6172 15.3203 TRAT TRAT TRAT TRAT TN A'I' T i< A T TRAT T ~:. A T 'rRAT' TRAT TRAT -qgq. Sb0O -090.7500 -990.2500 -999.2500 -a90.2500 3.5008 3,6004 3.3125 3.4473 3.3006 3,6113 3,4297 3.3340 3.?012 t,1211 2.0902 2.5273 9.9434 ? . ~'170 2.~320 MSTG MSIG NSTG MSTG NSTG NSTG NSIG ~!SIG '990,~500 -999.2500 99,2500 99,2500 20.1562 19 o531 19:4688 2~.0625 18.3504 18 0000 ls: 9o 17.5625 16,3281 i6,0938 15.2344 14,9375 15.1719 15.02t4 16.9062 14.7bTu 't4 ~2n3 14:9375 __ -t IL ' ....... ' i ,. m .. i iii iii II mm Ill mm iim ii I III I I III I 1111111 II I IIIII II I I IIII IIIIIIIIIIIII I I IIII IIII IIII IIIII IIIlll~lll [~¥P fll¢).ttO? V[R.[FICi~'lf~H LISTING ~'STG 16.n4.~? rSTG 1~.71.! DEPT goOn. ~000 O~ F$IG 32.5000 CR FSTG 31. ~71. 9 CR FSI(; 20 ~562 CR ~s~ (; 2~..~ ~ ~ DEPT 9~00.0000 VS%G 43.~375 FSIG 4t.1250 Ca FS~G 41,o062 DEPT 9700.0000 CR FS~G 43.o938 GR FSTG 4).0000 CR FSIG 4~,~875 C~ FS~G 42.0313 c~ FSYG 4n.78m3 ** FTLr TRalLE~ ** WILE ~W :~bI'!' .on1 SERVTC~ w~E ; VERSTOW ~ DATE : MAXIM[I~ [,EWGTH : i02~ FILE TYPF : 1~.5469 16.0219 2n.l. Sfi2 lP.5469 25.79~9 2a.59~8 1~.o219 2n.n375 22.57~I 21,3504 lq.82~1 mRAT ~.0746 ~S!G 'rRaT P.0629 MSTG T[~aT 3.4063 NSIG "r Rt~T 3.0449 MSIG T R/t']? ],P832 NSIG TRhT 3.1835 TRaT 2.05]2 TRAT 2.9824 NSTG TROT ~,8301 TROT 3.0234 23.3750 TRaT 3.7754 ~$1(; 30.0313 TRhT ~.3008 ~STG 27.~1~5 TRa7~ 4.343~ MSIG 33.4375 ~RAT 4.4336 N$1G ]5,6~75 7'R~T 3,06Pb ~STG 25.7969 TRAT 3.6523 M5IG 27.7031 3].fl~37 TROT 3.5195 ~SIG 33.4375 TRAT 4.0430 29.7500 ~.7188 44.o6~7 4~.78~3 41.o062 4a.8135 llllIllllllllllll III III I Ill I PAGE 4 14.5469 14.8750 14.7575 1].7422 14.5781 16.600g 14.2734 14.1562 14.~2o3 15.0547 14.0375 14.39~4 26,39o6 23.6563 30,2344 2~.0156 23.7500 26.5156 25.R1.25 2~.4219 25,328! 25.1875 37.7813 40.6250 3g.46~8 ]g.~437 3~.7500 39.0000 3q.1875 3q.0625 30.n635 3g.3750 ]RTGT~ : ~ONTTNI~ATIrlN # PROGRAM: LISCAN REVISION: 5.2 Start of execution: Thu 20 DEC 90 3:51p PART NUMBER: W5790-MICRO FiLE ~ 1 LIS .000 **** FILE HEADER **** 1024 CN : ARCO ALASKA INC. WN : D.S. 1-13 FN : PRUDHOE BAY COUN : N. SLOPE STAT : ALASKA * COMMENT RECORD * API NO. 50-029-20270. PDK - 100 RUN ON 24/NOV/90. FILE 1 : WELL FLOWING. FILE 2 : WELL FLOWING. PUMPED 350 BBLS OF CRUDE THEN CONTINUED PUMPING @ 1 BBL/MIN. FILE 3 : FIRST PASS AFTER PUMP - IN. FILE 4 : SECOND PASS AFTER PUMP - IN. FILE 5 : THIRD PASS AFTER PUMP - IN. FILE 6 : AVERAGE SGMA (DIFFUSION CORRECTED) AND POROSITY. NOTE : CURVE SGNT IN FILES 1 THROUGH 5 IS DIFFUSION CORRECTED SIGMA. : CURVE PDKP IN FILES 1 THROUGH 5 IS PDK POROSITY. : CURVE SGAV IS AVERAGE CORRECTED SIGMA IN FILE 6. : CURVE PAVG IS AVERAGE POROSITY IN FILE 6. * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME TAPE DEPTH UNIT : F 25 CURVES : NAME CODE SAMPLE# UNIT 1 BIF 68 1 DIM 2 BKL 68 1 CPS 3 BKS 68 1 CPS 4 CCL 68 1 DIM 5 CSLL 68 1 DIM 6 CSLS · 68 1 DIM 7 CSLT 68 1 DIM 8 CSS 68 1 API 9 G1 68 1 CPS 10 G2 68 1 CPS 11 GElS 68 1 CPS 12 GR 68 1 API 13 ISS 68 1 CPS 14 LS 68 1 CPS 15 MON 68 1 CPS 16 MSD 68 1 SU 17 PDKP 68 1 18 RATO 68 1 DIM 19 RBOR 68 1 DIM BYTES 4 4~ 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 RECEIVED JAN 9 1991 Alaska Oil & Gas Cons. Commission Anchora§~ 20 RICS 21 RIN 22~ SGMA 23 SGMB 24' SPD 25 SS 68 1 DIM 4 68 1 DIM 4 68 1 SU 4 68 1 DIM 4 68 1 F/MN 4 68 1 CPS 4 * DATA RECORD DEPTH CSLL G2 MON RICS SS 10380.000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 10330.000 16.89411 1939.862 2025.812 14.30844 30330.61 10280.000 15.12030 2206.985 1993.615 14.02894 29999.56 10230.000 13.43519 3118.345 1991.618 14.12346 29978.91 10180.000 19.37099 1780.155 1987.455 14.62290 26326.00 10130.000 15.76407 4770.078 1998.281 11.98545 48522.45 10080.000 18.34719 3371.380 1996.065 13.01149 (TYPE# BIF CSLS GElS MSD RIN -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 2.882439 18.11381 102629.9 0.2120032 9.404387 3.484067 16.55686 101424.8 0.1973392 9.218515 4.059608 14.96181 99988.62 0.1303393 9.279064 o) 2.970217 20.42844 93287.44 0.9094286E-01 '9.025984 2.782395 16.37432 126800.1 0.2436525 5.522304 2.675141 18.90259 117990.2 0.2975256 5.762171 942 BYTES * BKL CSLT GR PDKP SGMA -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 55.95601 18.33583 20.53192 30.51448 21.11652 46.31200 16.64405 15.58936 27.12859 20.01834 53.66400 16.09604 15.82903 26.34338 16.76173 616.2000 20.83129 53.69986 27.21925 20.38231 158.4330 16.78482 50.39525 -6.488848 18.74226 137.9340 19.67218 45.06700 -5.122309 20.54294 BKS CSS ISS RATO SGMB -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 210.7790 19408.35 281994.6 18.67079 62.30128 230.3690 19459.92 278991.9 17.36267 64.41171 283.0510 19935.24 272001.1 15.34632 64.99661 1238.031 17251.61 260435.4 17.15181 66.48248 388.0420 29875.11 353133.9 11.62896 77.82025 264.1230 26440.37 352338.7 12.32454 90.93031 CCL G1 LS RBOR SPD -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 0.0000000E+00 7797.738 1625.438 1.524709 7.999201 0.0000000E+00 8185.121 1728.629 1.528373 7.999201 0.0000000E+00 9238.055 1950.870 1.542864 8.999102 0.0000000E+00 6769.203 1535.382 1.546707 7.999201 0.0000000E+00 16405.69 4173.434 1.402843 7.999201 0.0000000E+00 13280.18 3534.272 1.417343 17.99820 43548.85 10030.0~00- 2.813977 130.0970 277.9531 0.0000000E+00 16.30347 17.44318 18.06559 29630.29 16378.05 4750.789 123237.5 42.13222 346235.5 4116.844 1998.361 0.2628181 -5.152513 11.83359 1.380544 11.54000 5.461143 18.78763 82.73604 17.99820 48697.20 9980.000 2.902109 143.5780 342.5620 0.0000000E+00 15.03005 16.06344 16.78939 30543.02 16922.32 5164.180 128172.5 42.08205 359950.2 4258.891 1996.651 0.3223017 -6.144829 11.53931 1.410262 12.50591 5.539705 18.17818 77.01810 17.88901 49238.93 9930.000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 TOTAL DATA RECORDS : STARTING TAPE DEPTH = FILE TRAILER **** 101 10380.00 ENDING TAPE DEPTH = 9930.00 **** REEL HEADER **** LIS 90/12/20 AWS 01 **** TAPE HEADER **** LIS 90/12/20 01 FILE # 2 LIS .002 **** FILE HEADER **** 1024 CN WN FN : ARCO ALASKA INC. : D.S. 1-13 : PRUDHOE BAY COUN : N. SLOPE STAT : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME TAPE DEPTH UNIT : F 24 CURVES : NAME CODE SAMPLE# UNIT BYTES 1 BIF 68 1 DIM 4 2 BKL 68 1 CPS 4 3 BKS 68 1 CPS 4 4 CCL 68 1 DIM 4 5 CSLL 68 1 DIM 4 6 CSLS 68 1 DIM 4 7 CSLT 68 1 DIM 4 8 CSS 68 1 API 4 9 G1 68 1 CPS 4 10 G2 68 1 CPS 4 11 GElS 68 1 CPS 4 12 GR 68 1 API 4 13 ISS 68 1 CPS 4 14 LS 68 1 CPS 4 15 MON 68 1 CPS 4 16 MSD 68 1 SU 4 17 RATO 68 1 DIM 4 18 RBOR 68 1 DIM 4 19 RICS 68 1 DIM 4 20 RIN 68 1 DIM 4 21 SGMA 68 1 SU 4 22 SGMB 68 1 DIM 4 23 SPD 68 1 F/MN 4 24 SS 68 1 CPS 4 * DATA RECORD (TYPE# 0) 1006 BYTES * DEPTH BIF BKL BKS CCL CSLL CSLS CSLT CSS G1 G2 GElS GR ISS LS MON MSD RATO RBOR RICS RIN SGMA SGMB SPD SS 10370.000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 10320.000 16.34907 2482.399 2025.131 8.998352 3.375957 ~17.31831 104585.9 0.2759413 19.40709 60.29401 17.48454 20.94273 18.02936 67.21896 205.0740 20380.39 286051.7 1.524031 11.99880 0.0000000E+00 8721.156 1741.860 13.86839 31405.46 10270.000 14.67886 2824.311 3.609313- 16.35931 107268.5 64.27602 16.75352 24.84956 255.6410' 20876.19 285279.6 0.0000000E+00 8996.664 1930.766 2024.674 0.1788233 16.51065 1.524382 13.80534 9.069.731 17.89737 63.83566 11.99880 31851.47 10220.000 19.80167 1515.796 1992.928 9. 185152 10170.000 15.85309 2262.419 1994.670 8.837315 2.684422 75.24100 237.3030 0.0000000E+00 20.74427 21.52476 20553.05 7245.168 115484.8 30.56406 301139.5 1762.870 0.5453149 18.16144 1.541557 14.24513 25.58353 71.18761 11.99880 31995.42 3.157508 539.0530 881.9690 0.0000000E+00 17.63303 18.89171 19960.76 8213.492 104704.4 66.19745 281799.6 1779.828 0.2810884 17.42250 1.511295 14.08169 20.14009 67.19885 11.99880 31013.69 10120.000 16.99395 4419.113 1995.706 5.379237 2.631952 155.7960 328.1411 0.0000000E+00 17.49151 18.19114 30512.11 16213.51 131959.2 51.18735 379799.6 4142.941 0.1307997 12.07711 1.392574 11.54728 19.80615 83160988 12.82300 49980.12 10070.000 18.23263 4235.578 1995.614 5.408040 2.497694 169.9260 362.4111 0.0000000E+00 19.00372 19.21835 31646.77 16138.81 138411.2 48.34230 373391.7 4195.492 0.1662573 12.51274 1.398726 11.61901 20.53992 85.11407 15.99840 52559.38 10020.000 16.31387 5078.344 1996.546 5.358002 2.676518 122.8440 307.1589 0.0000000E+00 17.00631 17.59083 33684.77 18165.02 141872.4 43.85516 380763.8 4810.301 0.2385005 11.52678 1.396663 11.11490 19..44539 79.98038 15.99840 55425.35 9970.000 -999.2500 2517.265 1995.449 5.427391 2.361206 250.0720 462.1721 0.0000000E+00 -999.2500 -999.2500 29103.55 12614.71 141825.9 72.09276 377288.1 3488.354 0.3150633 13.81367 1.465812 13.02722 24.53955 92.44940 15.99840 48102.28 TOTAL DATA RECORDS : STARTING TAPE DEPTH = FILE TRAILER **** 87 10370.00 ENDING TAPE DEPTH = 9940.00 **** REEL HEADER **** LIS 90/12/20 AWS 01 **** TAPE HEADER **** LIS 90/12/2.0 FILE # 3 LIS .002 **** FILE HEADER **** 1024 CN : ARCO ALASKA INC. WN : D.S. 1-13 FN : PRUDHOE BAY COUN : N. SLOPE STAT : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME TAPE DEPTH UNIT : F 24 CURVES : NAME CODE SAMPLE# UNIT BYTES 1 BIF 68 1 DIM 4 2 BKL 68 1 CPS 4 3 BKS 68 1 CPS 4 4 CCL 68 1 DIM 4 5 CSLL 68 1 DIM 4 6 CSLS 68 1 DIM 4 7 CSLT 68 1 DIM 4 8 CSS 68 1 API 4 9 G1 68 1 CPS 4 10 G2 68 1 CPS 4 11 GElS 68 1 CPS 4 12 GR 68 1 API 4 13 ISS 68 1 CPS 4 14 LS 68 1 CPS 4 15 MON 68 1 CPS 4 16 MSD 68 1 SU 4 17 RATO 68 1 DIM 4 18 RBOR 68 1 DIM 4 19 RICS 68 1 DIM 4 20 RIN 68 1 DIM 4 21 SGMA 68 1 SU 4 22 SGMB 68 1 DIM 4 23 SPD 68 1 F/MN 4 '24 SS 68 1 CPS 4 * DATA RECORD DEPTH (TYPE# 0) 1006 BYTES * BIF BKL BKS CCL CSLL G2 ~ MON RIN 10370.000 -999.2500 -999.2500 -999.2500 -999.2500 10320.000 17.77779 2524.124 2011.319 9.249552 10270.000 15.81862 3088.251 2010.936 8.999626 10220.000 25.13251 1642.465 2007.838 9.141788 10170.000 18.35927 2839.020 2008.969 8.530779 10120.000 16.39073 3155.771 2010.982 8.373941 10070.000 16.94794 2755.225 2009.933 8.566885 10020.000 15.98153 3551.803 2011.474 8.214571 9970.000 -999.2500 1379.955 2011.221 CSLS GElS MSD SGMA -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 3.490348 19.24716 109454.9 0.3542217 19.79330 3.624076 16.65688 119285.0 0.2899789 18.25534 2.230857 26.76284 128063.7 0.2236697 25.12071 2.887598 19.36030 104865.6 0.3690872 20.55475 3.012761 17.21709 104596.0 0.2080416 19.47571 2.653645 17.88637 109277.0 0.2836781 20.91728 3.015226 17.08259 114737.8 0.4996546 19.39232 1.789291 -999.2500 111394.2 0.3244464 CSLT GR RATO SGMB -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 76.40900 19.45945 23.14832 17.35507 68.83229 79.06100 17.36554 22.73761 16.34268 66.91472 86.25600 27.78093 29.60890 17.97575 72.30396 154.0580 19.95149 64.09987 17.26218 77.14386 82.41699 18.31189 27.17232 16.07867 73.43527 64.90001 18.92180 25.57457 16.25145 74.52448 74.77402 18.28314 22.32947 15.52126 78.79021 115.0720 -999.2500 51.79950 19.65118 CSS ISS RBOR SPD -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 255.3120 21137.40 296005.3 1.509671 15.04010 232.4200 22905.52 308522.1 1.524597 15.99250 215.4150 22547.76 326359.4 1.550484 15.99840 279.0139 22809.82 285862.2 1.414977 15.99840 1188.755 22912.04 288076.4 1.411141 15.99840 1161.800 23078.04 287782.0 1.451797 15.99840 1234.315 25279.15 299059.6 1.440602 15.99840 1258.880 20950.12 292399.0 1.512411 G1 LS RICS SS -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 0.0000000E+00 9032.293 1874.361 13.87807 32488.50 0.0000000E+00 10060.25 2106.391 13.51790 34441.59 0.0000000E+00 7894.922 1938.482 13.99948 34845.72 0.0000000E+00 10934.51 2155.356 12.48541 37124.45 0.0000000E+00 11351.70 2297.145 12.30196 36918.69 0.0000000E+00 10812.75 2293.447 12.26174 37296.95 0.0000000E+00 12586.76 2628.239 11.84061 40740.82 0.0000000E+00 7907.133 1733.637 14.24558 8.784035 27.06335 77.09610 15.99840 33912.27 TOTAL DATA RECORDS : 87 STARTING TAPE DEPTH = 10370.00 ENDING TAPE DEPTH = **** FILE TRAILER **** 9940.00 **** REEL HEADER **** LIS 90/12/20 AWS 01 **** TAPE HEADER **** LIS 90/12/20 01 FILE # 4 LIS .002 **** FILE HEADER **** 1024 CN : ARCO ALASKA INC. WN : D.S. 1-13 FN : PRUDHOE BAY COUN : N. SLOPE STAT : ALASKA * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME TAPE DEPTH UNIT : F 24 CURVES : NAME CODE SAMPLE# UNIT 1 BIF 68 1 DIM 2 BKL 68 1 CPS 3 BKS 68 1 CPS 4 CCL 68 1 DIM 5 CSLL 68 1 DIM 6 CSLS 68 1 DIM 7 CSLT 68 1 DIM 8 CSS 68 1 API BYTES 4 4 4 4 4 4 4 4 9 G1 10~ G2 11 GElS 12 GR 13 ISS 14 LS 15 MON 16 MSD 17 RATO 18 RBOR 19 RICS 20 RIN 21 SGMA 22 SGMB 23 SPD 24 SS 68 1 CPS 4 68 1 CPS 4 68 1 CPS 4 68 1 API 4 68 1 CPS 4 68 1 CPS 4 68 1 CPS 4 68 1 SU 4 68 1 DIM 4 68 1 DIM 4 68 1 DIM 4 68 1 DIM 4 68 1 SU 4 68 1 DIM 4 68 1 F/MN 4 68 1 CPS 4 * DATA RECORD DEPTH CSLL G2 MON RIN (TYPE# BIF CSLS GElS MSD SGMA 0) 1006 BYTES * BKL CSLT GR RATO SGMB BKS CSS ISS RBOR SPD CCL G1 LS RICS SS 10370.000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 10320.000 17.46625 2559.718 2018.832 9.037476 3.373108 19.00955 112314.8 0.2676809 19.74878 48.06700 19.97459 27.66791 17.24001 70.63977 248.0030 21764.07 301995.6 1.523982 15.99840 0.0000000E+00 9272.586 1944,.742 13.75098 33526.53 10270.000 16.78233 3095.074 2017.611 8.877539 3.251287 17.95163 116740.9 0.2751768 17.71301 64.17300~ 18.75010 27.75865 16.19351 67.77342 250.6420 22486.57 303027.2 1.511697 15.99840 0.0000000E+00 9666.766 2094.514 13.45271 33888.98 10220.000 24.51821 1596.005 2013.804 9.122032 2.251401 26.56781 124316.7 0.1925649 25.52916 82.01802 27.40176 35.80843 18.14359 74.83946 220.6650 21870.09 318276.8 1.571081 15.99840 0.0000000E+00 7611.113 1860.997 14.11812 33784.22 10170.000 18.00726 2746.628 2015.569 8.521481 2.696630 18.94979 105026.2 0.4593505 20.80782 177.8810 19.70075 75.81346 17.36717 73.35083 297.7219 22470.17 286318.3 1.419480 15.99840 0.0000000E+00 10627.21 2110.063 12.63666 36674.65 10120.000 16.07288 2.939184 17.25311 50.96300 18.18238 182.6930 22227.87 0.0000000E+00 10945.50 3026.477 102190.6 28.07576 287284.4 2313.686 2016..510 0.2431116 15.47933 1.426925 12.13899 8.391487 19.69406 73.12167 15.99840 35799.34 10070.000 2.648894 80.50601 224.7530 0.0000000E+00 16.68856 17.65130 18.67179 22204.55 10273.57' 2590.731 104795.2 31.55144 282274.1 2190.174 2016.427 0.3552412 16.52815 1.427574 12.41543 8.577314 20.94574 74.64085 15.99840 36294.96 10020.000 15.95106 3378.513 2019.162 8.336349 2.820126 68.65500 163.4680 0.0000000E+00 16.90381 18.29818 24269.92 12244.98 110244.2 23.14842 291696.1 2543.378 0.1889993 15.41266 1.447505 11.97621 19.58231 76.22127 15.99840 39098.26 9970.000 -999.2500 1424.286 2017.642 8.640095 1.851017 163.4140 261.9941 0.0000000E+00 -999.2500 -999.2500 20250.37 7644.578 107056.4 53.37373 282519.9 1637.097 0.2598597 20.01184 1.514063 14.46534 26.30360 73.78203 15.99840 32690.54 TOTAL DATA RECORDS : STARTING TAPE DEPTH = **** FILE TRAILER **** 87 10370.00 ENDING TAPE DEPTH = 9940.00 **** REEL HEADER **** LIS 90/12/20 AWS 01 **** TAPE HEADER **** LIS 90/12/20 01 FILE # 5 LIS .002 **** FILE HEADER **** 1024 CN : ARCO ALASKA INC. WN : D.S. 1-13 .. FN : PRUDHOE BAY COUN : N. SLOPE STAT ' : ALASKA * FORMAT RECORD (TYPE# 64) .ONE DEPTH PER FRAME TAPE DEPTH UNIT : F 24 CURVES : NAME 1 BIF 2 BKL 3 BKS 4 CCL 5 CSLL 6 CSLS 7 CSLT 8 CSS 9 G1 10 G2 11 GElS 12 GR 13 ISS 14 LS 15 MON 16 MSD 17 RATO 18 RBOR 19 RICS 20 RIN 21 SGMA 22 SGMB 23 SPD 24 SS CODE SAMPLE# UNIT BYTES 68 1 DIM 4 68 1 CPS 4 68 1 CPS 4 68 1 DIM 4 68 1 DIM 4 68 1 DIM 4 68 1 DIM 4 68 1 API 4 68 1 CPS 4 68 1 CPS 4 68 1 CPS 4 68 1 API 4 68 1 CPS 4 68 1 CPS 4 68 1 CPS 4 68 1 SU 4 68 1 DIM 4 68 1 DIM 4 68 1 DIM 4 68 1 DIM 4 68 1 SU 4 68 1 DIM 4 68 1 F/MN 4 68 1 CPS 4 * DATA RECORD DEPTH CSLL G2 MON RIN (TYPE~ 0) 1006 BYTES * BIF CSLS GElS MSD SGMA BKL CSLT GR RATO SGMB BKS CSS ISS RBOR SPD CCL G1 LS RICS SS 10380.000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 10330.000 18.46828 1968.952 2000.008 8.960657 3.277665 19.53536 108082.3 0.5644825 21.89941 86.60599 19.99920 31.21001 18.41980 71.99594 242.1300 20370.77 285596.7 1.507789 15.99840 0.0000000E+00 8161.031 1719.361 13.83872 31633.81 10280.000 15.09708 2625.423 1998.285 9.073992 3.920713 16.38637 112642.0 0.2652029 19.36143 79.98201 17.45453 30.88913 16.71860 67.57581 1218.179 21553.12 291642.3 1.536598 15.99840 0.0000000E+00 8968.785 1978.391 13.52905 33065.23 10230.00© 11.74374 3614.107 1996.243 9.086971 4.955255 13.29453 111401.6 0.4685634 16.23439 89.92401 14.62906 28.28494 15.34612 67.03413 1261.171 22287.05 292686.6 1.544918 15.99840 0.0000000E+00 10301.46 2184.819 13.38745 33541.95 10180.000 16.66771 2720.118 1994.253 8.492500 2.921628 17.63984 99643.69 0.5162957 19.61853 154.3550 18.82322 69.76195 16.09526 70.80460 258.7959 21068.76 276292.6 1.462651 15.99840 0.0000000E+00 9813.102 2101.471 12.81510 33872.84 10130.000 15.48305 3267.086 1998.390 8.269201 3.077744 16.65081 101815.4 0.3211593 19.04370 78.05801 17.70253 37.33377 15.04484 74.58061 190.4680 22296.76 273536.5 1.440818 15.99840 0.0000000E+00 11334.77 2350.496 12.26316 35302.80 10080.000 19.02617 2247.536 2000.341 8.706219 2.908708 19.74582 99438.50 0.4362513 21.72212 83.46301 20.90517 33.76828 16.80684 84.08253 1272.921 20460.21 276962.3 1.461744 15.99840 0.0000000E+00 9370.465 1969.738 12.74569 33092.03 10030.000 15.50463 3459.942 2001.936 8.332462 3.199569 16.71244 101165.8 0.2838973 18.74287 64.33000 17.92777 29.75903 15.46332 77.66292 209.9670 22874.72 274114.3 1.449211 15.99840 0.0000000E+00 11827.40 2396.082 11.92389 36972.27 9980.000 13.34506 3506.251 2001.222 8.448524 3.574630 14.48373 106923.6 0.3607425 18.43599 72.00800 15.65304 29.59229 14.78783 70.40485 209.7970 23157.25 283685.1 1.453023 15.99840 0.0000000E+00 11566.31 2446.206 12.91634 36346.11 9930.000~ -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 TOTAL DATA RECORDS : STARTING TAPE DEPTH = **** FILE TRAILER **** 91 10380.00 ENDING TAPE DEPTH = 9930.00 **** REEL HEADER **** LIS 90/12/20 AWS ; 01 **** TAPE HEADER **** LIS 90/12/20 01 FILE ~ 6 LIS .001 **** FILE HEADER **** 1024 CN : ARCO ALASKA INC. WN : D.S. 1-13 FN : COUN : STAT : * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME TAPE DEPTH UNIT : F 2 CURVES : NAME CODE SAMPLE# UNIT 1 PAVG 68 1 2 SGAV 68 1 BYTES 4 4 * DATA RECORD (TYPE# 0) 1014 BYTES * DEPTH PAVG SGAV 10380.000 -999.2500 -999.2500 10330.000 30.79735 16.99133 10280.,000 26.04298 15.24928 10230.000 17.64650 13.29796 10180.000 22.48360 15.79238 10130.000 17.29610 14.91400 10080,0.00 10030,000 9980,000 9930,000 20.15671 18.18868 13.33745 -999.2500 16.89347 14.73075 14.87075 -999.2500 TOTAL DATA RECORDS : 11 STARTING TAPE DEPTH = 10380.00 ENDING TAPE DEPTH = **** FILE TRAILER **** 9930.00 **** TAPE TRAILER **** LIS 90/12/20 01 TOTAL RECORDS IN THIS LOGICAL TAPE : 505 **** REEL TRAILER **** LIS 90/12/20 AWS 01 TOTAL RECORDS IN THIS LOGICAL REEL : TOTAL RECORDS IN THIS PHYSICAL REEL: End of execution: Thu 20 DEC 90 3:52p Elapsed execution time = 52.24 seconds. SYSTEM RETURN CODE = 0 506 506 i i i I 1 ,L' ii 11 il 1! 11 Il I1 1 l, 1 1 .L 1 1 1. 1 111,tli 000000 OOO000 11 000000 OOUOOO 1. 1 O0 O0 O0 OO 1111 O0 O0 O0 oO I I 11. (JO 0000 Ou 0000 11, O0 0000 OO 0000 I 1 O0 O0 OO uO O0 O0 1 1 O0 O0 O0 O0 UO O0 1 l 0000 O0 uOOO O0 I 1 gO00 O0 OOOO UO i ,I O0 OU O0 O0 1. 1 00 00 00 00 11 000000 uOOOO0 1111 OOO000 O00OO0 I 111 11 1 [ UA'lit 08""'iflAR-- 19 20:Uo:~! ~070t)~55001 RLg L, 'I' A P E PA'rE: '791 31 I 01 79/ 3t i bl:t, Ng'J'h; 1 ~ 1 U¥ ] C f. Jl",~ P A N ~: ~ t"_, L~ i,: C [Jbt,i I i: ARCU U/b At~b DRibL Si'l'b 1-i. 3 PRUDhUL i~(J~l'H 5bOP~ 0 DAfUtq ~P~CI~1C~TiU~ ~bOCtS~: iTT 0 0 0 0 0 4 0 0 1 o ~ 0 0 GAPJ 51 31 32 0 0 4 0 0 1 68 0 0 C/C 51 42 1 0 0 ~ 0 0 1 o8 0 0 CO 51 .40 I 0 0 ~ 0 O 1 o8 0 0 fL; U 5 .It 40 1 0 0 4 0 0 I 6 ti 0 0 GaP l 51 31 32 0 0 4 0 0 1 08 0 0 C / C 51 ,"~ 2 I 0 0 ~ 0 0 I o 8 0 0 CO 5 i ~0 1 0 0 4~ 0 0 1 Ot~ 0 0 C u 5 1 40 1 0 0 4. 0 0 i o 8 0 0 O a P t 51 ,~ 1 32 0 0 q 0 0 I 68 0 0 C/C 51 42 I 0 0 4 0 0 I b~ 0 0 CU 5 1 40 I 0 0 ~ u 0 1 b8 0 O CO 5 I 40 1 0 0 4 O 0 1 b8 0 0 GAF't bi 31 32 0 0 4 0 0 I b8 O 0 C t fi. 51 42 1. 0 0 ~ 0 0 1 ~ 8 0 0 C U 51, ~ 0 I 0 0 4 0 0 I b 8 0 0 C U 51 a, 0 I. 0 0 4 0 0 i t) 8 0 0 GAP1 51 31 32 0 O 4 0 0 1 DB 0 U C/C 51 42 1 0 0 4 u 0 1 b8 0 0 Cci .~1 ~0 1 0 O /i 0 0 1 08 0 0 CU 51 .~0 I 0 0 4 0 0 I b8 0 O 106~b, 000 1 O500. uO0 1 i) 400. 000 1()300. 000 10 Z O 0 . 00 O 1.01 uO. 000 lO0OO.uO0 9900. uO0 M i:'~ E M Lt i:,t 1, C GR. GH -999.250 -999.250 -999.250 -999.250 -999.250 24.188 25.28i 31.734 31.844 3i.34,~ i2.898 1~.984 18.641 21.76o 2u.b25 11.289 i4.o17 10.922 20.563 Z0.625 10.0:18 14.61'1 15.320 lo.922 20.15b 1~.b47 25.79/ 24.59~ 10.922 20.938 22.518 21.359 19.828 23. J?b 30.0jl Zb.79/ 27.70~ 33.43~ 29.750 i' g A 'I i R A '1 1:MA T I'RA 'I~.H A 1' ,1' P, A 'I i'AAi' 'fRA'i 'IRA'I' i~AT '.iR A T £f<A i' i ~ A'i~ 1'14A 1' 'r~ A ] R A 1 £ F A 1' i H A 1 V A b b ~, -999.250 -999.250 -999.250 -999.250 -999.250 3.510 3. b 09 ]. 313 3. 447 3.]01 3.bll 3.430 3.334 3.201 3.121 2.990 2.527 2.8'11 2.943 2.8 77 2.832 2 3.400 3.189 3.0~5 3.283 ~.102 j.184 2.951 2.982 z.830 ~.U23 3.7 '75 5. 301 3.0o3 3.~52 3.012 ~.520 4.043 3.777 N~IG l>~SIG NS1G Iv ;5 .I L, V ALUm,., -999.250 -999.250 -999.250 -999.250 -999.250 20.156 19.953 19.~09 22.003 lU.359 18,000 15 17 1 b. 32~ lb. Ogi 15.234 14.93U 15.172 15.023 it.90b 14./b8 14.938 1 ~. 54 7 1~.875 Iq.758 13. 742 14.b'/8 14.Z73 I~.165 iq.u20 15.o55 14.39U 20..~91 g3.055 30.2J4 24.01h 23.750 2e.blb 23.422 25.328 Zb.168 M N E i¥1U i',~ 1 C ~51G FSiG P"SiG FSiG F&IG ES1G KaiG ~'SiG FSIG FSIG ~SIG ~SIG FSIG i.'alG ~51G i'51G VALU~ -999.250 -999.250 -999.250 -999.250 -999.250 2~.953 Zq.i09 23.003 23.828 23.484 i9.313 19.547 19.109 20.95S 19.503 i9.5~"; 19.9u0 19.828 19.15o 19.313 1'/.3~i li.51b lo.15b i,b.2i9 17.750 iS.lU~ lB.2Bl 1'1.359 17.531 lB.109 17.'lbu 17.43U 33.000 z8.07~ 31.42Z 34.125 32.053 32.500 31.b'12 Z~.lbb 3.S.40o 29.~53 97V0. 000 G~ G~ G~ VALO 42. 48. 41. 42. 41. ~1. 31. 71.9 9t~9 9{) ~ 8,1.3 344 I~ t-~ A T i R A T T ~ A T 1'~4 A T 1' A A T 1' i'~, A T V AbUl~ 4.938 5.121 4.840 4.9.50 5.1B4 4.9,38 4.941 4.905 4. 949 4.750 3 1. ? 8 1 40.625 38,409 38. 38. !50 Jg.000 39. 003 :~ 8.37 5 F$1G ~'81G FSiG FSIG FSIG ~iG FSIG VALUE 42.34~ 43.43~ 43.125 4i.90b 42.503 42.094 42. 000 42.188 ~2.031 40.781 bk~l~Gih UP i~.ECUl<DS: 101~ b~:[Eb i:;.,13[" bL, NGId: 132 bYTL, S 5ERVI. C~ i~AM~;: ~DIT 'I'AP~ CUN~!NUA'[£t~N NUaDE, H: O1 DATL: 791 ~1 i RE£EIV CAT£ 000 000 000 OOO (: 0 0 O 00 SIZE 01~ Gl4 o12 OOP uO ~ 007 ~0~ $1Z~S ~J 0 7 uuDE u65 065 O65 065 065 065 065 065 065 CODE O65 ~EPR 0.425 293.58~ 210,319 180.273 200. o 17 lO7,~42 219.31¥ 2C'4. :~IC 16:3. -999,25C.. bEVEL O 0 0 0 CODE 68 68 68 68 -999,250 3,354 2,946 3,447 3.364 3.401 3.1io 3. 034 3.505 2.460 3,993 -999.250 0 0 9 0 0 7 O6 5 $1~ ~.LER CO~B · . 25 i"j 250 89 0 56. b 5 2 14.779 -99¥. 250 181.56I i96.154 2O7. 204.31,~,'"' 24}. PAGE 3.344 3.362 3.094 3.288 3.058 3.499 2.438 4.171 2.040 PAGE DIRECT DIGITAL LOGGING COMPUTER PROCESSED ANALYSIS Company,, ARCO ALASKA INC, We ! 1 DS 1 - 1 3 ;;;H,~ L~No Field PRUDHOE BAY DATE OF JOB: 0..-02-86 Cou~3tp NORTH SLOPE otmtm ~LR..KA Countrp io~ CLIENT FORMAT DATA TAPE LOG INFORMATION STANDARD FORMAT ( L , I , S , No,: ARCO 1-i~ Depths: 9'B25, O0 to 1 0417, O0 Name: DS i-J3 CH?CNS Field: PRUDHOE BAY DATE OF JO8:05-02-86 Date: 2 JUNE,. 1986 Time: 11:30 AM MON, Page: .................1 ........ ~ L, I, S, TAPE RECORDS *** REEL HEADER Service name: &G5FOI Prmviouz r¢~l: Date: ~o,-u6~ V~ Commentz: HEADER Origin: RECORD~' name: 363684 Page Continuatior, ~: Ol TAPE HEADER Service name: &G5F01 Previouz tape: Comments: Origin: Tape name~ Continuation #: O1 EOF :+:* :*' :~{~ ;FI[LiE HEADER ~, .,SF O100i File name,: '~' Maximum t~ngth: 1824 HEADER RECORD©~, Y~rzion :#: File tpp~: LO Previous Page MNEM CN WN FN ~COUH STAT CTRY SECT TOWN RANG EKD EOF EGL PD LMF DMF RUN LCC SOH LUN FL LUL Ei'.GI WiTN DD DL TLI 8Li TLA8 BHT MRT MT MSS MVIS RM RMF MFST MFSS RMC MCST MCSS CONTENTS ARCO ALASKA INC, DS i-!3 CH?CNS PRUDHOE BAY NORTH SLOPE ALASKA USA ~ON iSE 7~, OOO 4 O. 00 34,00 O , MS 7208 NO~TH SLOPE NORTH SLOPE ~OEDER FIFE ~ 0392.00'0, I 0~88, OOO. 9925, O O0 } 0~87, '00 O, 0 00 O, 00 O O,OOO O, .000 CRUDE O OOO 0 000 0 000 6 006 0 000 DATE OF I NFORMA 05-02.-86 TION RECORDS UN t T TYPE CATG SIZE CODE 0 0 40 "~ 0 0 40 '~:' 0 0 40 65 O O 20 65 O 0 20 65 O 0 ,-.:. 0 65 0 0 2 65 O 0 3 0 0 3 65 FT 0 ..'4 4. 6,8 FT 0 S 4 68 FT 0 3 4 68 0 ~ 2 65 0 ~ 2 6,._'5 0 ~ 2 65 0 0 2 79 0 0 2 79 0 0 1 0 65 O 0 10 65 0 0 20 ~ 0 0 20 ~= 0 0 20 65 0 0 20 65 FT 0 3 4 ~"~,~ FT O 3 4 68 FT 0 .3 4 68 FT 0 ,3 4 6,8 HR 0 2 4 68 HR O 4 4 68 DEGF 0 i 4 68 DEGF 0 i 4 68 O 2 20 65 O 2 20 65 CP O 2 4 68 OHMM 0 '2 4 68 OHt. iM 0 2 4 68 DEGF O 2 4 68 0 2 i2 65 0 H M M 0 '2 4 .68 DEGF 0 2 4 68 0 '2 12 65 Page COMMENT RECORDS This LIS ~apm was written by Gearhart Industrims Wirmlin~ S~rvic~ All curve and tool mnmmonics u~ed are tho~m which most clo~ml~ match Gearhart curv~ and tool mnemonics, GEARHART TO SCHLUMBERGER MNEM SERVICE UNIT MNEH SERVICE UNIT Page DEPTH FEET DEPT FT GR MERGE GAPI GR MERGE GAPI CCI. MERGE MV CCL MERGE MV FCNI.. MERGE CPS FCNL MERGE CPS NCNL MERGE CPS NCNL MERGE CPS NPHS COMPUTED SSPU NPHI COMPUT PU RAT COMPUTED NRAT COMPUT AVG COMPUTED AVG COMPUT DATA ENTRY BLOCKS ENTR'¢ TYPE DESCRIPTION 0 TmF. minator ( no more mntrim~ ) F~ORMAT SPEC I F I CA TYPE SIZE CODE 0 i 66 TIONS DATA FORMAT SPEC I F I CAT IONS P~ge DATUM SPECiFICATiON 8LOCKS mmm* MNEM SERVICE SERVICE APl APl AP1 AP1 FILE ID ORDER ~ UNiT LOG TYPE CLASS MOD ~ PRC ~ SiZE LVL SMPL RC PROCESS INDICATORS DEPT 363684 FT 0 0 0 0 0 GR MERGE 363684 GAPI 0 54 ~ 0 0 CCL MERGE 363684 MY 0 150 1 O 0 FCNL MERGE 36S684 CPS 0 78 3~ .O 0 NCNL. MERGE 363684 CPS 0 78 30 0 0 NPHI COMPUT 36J684 PU 0 122 2 0 0 HRAT COMPUT 363684 ..... O ,O 0 0 O AVG COMPUT ~6~684 0 0 0 0 0 4 0 t 68 4 O i 68 4 0 i 68 4 0 1 68 4 O t 68 4 0 1 68 4 0 ~ 68 4 0 t 68 000000 000000 000000 O00OO0 000000 OOOO00 OOOOOO 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 DEPT DATA RECORDS GR CCL FCNL NCNL NPH t 0,000 O. 000 0. O00 0.000 -6,566 Page 8 NRAT AVG -999.250 -750,89! i 03I 7.0-00 22. 000 .09 0 298,200 .7,67,700 25 . 930 J . 248 26 , 1 05 JO2J.7,000 20,500 ,230 :324. J 00 387.000 24,880 i,178 25,665 39.700 i.i90 405,3O0 481.900 23.640 'i.263 24,550 0017,000 28,200 ,250 498, 100 54~ ,000 18,399 J ,138 ~9.038 Maximum l~ngth: 1024 TR~ I LER REL]ORDe~. Vmr. sion ~: Fi lm t.,.:.~pm: LO Ne. xt f'i!~:: Dat~: Pmge * EOF ~'~ ~ · FiLE HEADER ~:~ Fil~ n.am¢~ i~]SFOi ,002 HEADER RECORD'-~, ~mrsion ~: iO Maximum l~ngth: I0~:4 Fil-~ typm: LO Pre. vious f'ilm: 1 NFORMAT I ON RECORDS P.~g~ ti t'i t'i E M CONTEHt'S UHiT TYPE t..; H TI~ SI~E CN WN FN COUN STAT CTRY SECt' TOWH RAH~ Ei<8 EOF EGL PD LMF DMF RUN LC(; SOH LUN FL LUL ENGt DD DL TLI BLI TCS i'LAB .BH T blRT I'iT ~iSS ~IVIS RM RMF tIFST I~FSS RI'lC blCST blCSS ARCO ALASKA INC. DS 1-t3 CH?CHS PRUDHOE 8AY NORTH SL. OPE :ALASKA USA iSE 40, O00. ~.4. :O00, ~iS NORTH SLOPE NORI'H SLOPE ROEDER FIFE i 0.~9 1 9925 O. 00 0,00 0,00 · .0, O0 CRUD DA!'E OF' JOB '0'0 O 8,00 0 ........... .............. Fi ~T .000 .............................................. 7.000 .............................. OIIIIIIIIIlIIlII I I IlIII IIlIIIIIII I O, 0'00 O, O,OOO ~ r I i ~ r 0. 000 FT FT FT FT HR HR DEGF DEGF 0 0 40 65 0 0 40 65 0 0 40 65 0 0 20 65 0 0 20 65 0 O 20 0 0 2 65 0 0 3 65 0 0 .3 65 0 3 4 68 0 ~: 4 68 0 3 4 68 0 '~, '" 6. 0 3 2 65 0 3 2 0 0 2 79 0 0 2 79 0 O I 0 65 0 0 i 0 65 0 0 2 0 65 0 0 20 E, 5 0 0 20 0 0 20 65 0 3 ,-i. 68 0 .3 4 68 0 3 4 68 0 2 4 6 E~ 0 4 4 68 0 1 4 68 0 1 4 6 0 2 20 65 0 2 2 0 '.~ 0 2 4 "-' 0 2 -I 6 :_:: 0 2 4 68 0 2 4 68 O 2 12 65 0 '2 4 68 0 2 4 68 0 2 12 65 COMMENT RECORDS ** T'h.is LIS tape was writ'ten by Gmat. hart Industrims Wir~iinm mm All cur. vm and tool mnmmonics usmd arm thosm which most cl~~-. c.~ly match ** Gearhart curve and tool GEARHART TO SCHLUMBERGER MNEM SERVICE .UNIT MNEM SERVICE UNIT DEPTH FEET DEPT FT GRI, MERGE GAPi GR MERGE GAPI CCLi MERGE MV CCL MERGE FCNLt MERGE CPS FCHL MERGE CPS NCNLI MERGE CPS NCNL MERGE CPS NPH.SI COMPUTED SSPU NPHI COMPUT PU RAT'I COMPUTED NRAT COMPUI' 12 DATA ENTRY BLOCKS ENTRY ENTRY BLOCK LEGEND TYPE DE.L;RiPTiON 0 Tmr. minmtor ( no mor-e, entrims ) FORMAT TYPE SIZE oPECIFICA CODE 0 I 66 TIONS i3 ~ATA FORMAT DATUM SPECIFiCATiON 8L. OCKS SERVICE SERVICE AP1 AP1 APl APl FILE MNEM ID ORDER ~ UNIT LOG TYPE CLASS MOD, ~ DEPT S6JG84 FT 0 0 0 0 0 GR MERGE 363684 GAPI 0 54 i 0 i CCL MERGE ~6~G84 MY 0 FCHL MERGE ~6~684 CPS 0 78 Si 0 i NCNL MERGE 363684 CPS 0 78 SO 0 i NPHI COMPUT 363684 PU NRAT COMPUT ~63684 .... 0 0 0 0 i SPEC I F 1 CAT 10NS PRL: ~. SiZE LVL SMPL RC 4 0 i 68 4 0 i G8 4 0 i 68 4 0 I 68 4 0 i 68 P~'.u~;~..-, i ND i CATOR'"~.-, 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 P~g~ DEFT TA RECORDS GR CCL FCt4L NCNL NPHI HRAT Page 15 10400 .. 000 0,000 0,000 0,000 .:,~1 , 050 -99'~.., 2P10._ i 03'0,'~. 0 00 23.6'00 ,570 294,300 3oo,000 24,460 i 0200. :000 20.~08 790 ogo 200 ~$ ~00 24 ~' t O1 O0.000 ,~60 432.9'00 509,700 2~,S80 1,2i5 10000,080 50.~00 .230 401,800 Fi le namF-.': &t.]SF01 . 00;-~ Maximum Imngth: i"~" TR~ [LER RECORDS 9ersion #: File type: LO Nmxt 6itm: i6 FiLE HEADER ~u.:,F O1. 003 HEADER RECORDS V~r~ion ~: Datm: Page Maximum length: 1'024 File type: LO Previous ~ilm: MNEM CN WN FN COUN STAT CTRY SEC T TOWN RANG EK8 EDF EGL PD LMF DMF RUN LOC SON LUN FL LUL ENGI WITN DD DL TLi 8Li TC.S TLAB BHT MRT MT HSS HViS RM RMF MFS'r HFSS RMC MCST MC:SS INFORMATION RECORDS CONTENTS UNIT ARCO ALASKA 1NC, [)S t - i .~ CH?CNS PRUDHOE BAY NORTH SLOPE ALASKA USA ~ 'ON iSE 7~. 40, -O 0 0 234.0 0 0 MS ......... KB KB ......... ~0 7208 , . NORTH SLOPE NO~TH SLOPE ROEBER F ~ FE 10392,0 80 .... ~ 0388, O0 O .... 9925, O:O O ..... ~ 0387, O, 000 ........ O,OOO ........ O, 808 ........ CRUDE O, 00 0 .............. 0, O0 O ............. O.O00 ............. 6: o o ...... O..OOO ............. JOB 05-02-86 · IIlllllri;lllllll Illm FT FT FT FT FT FT FT HR HR DEGF DEGF CP OHMM OHMM DEGF OHMH DEGF T'¢PE 0 0 0 0 0 O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 CATG 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ...9 2 4 1 i 2 2 2 2 2 '2 '2 olZE 4O 40 40 20 20 20 2 3 4 4. 4 2 2 2 2 2 10 i0 20 20 '--'. 0 ~.0 4 4. 4 4 4 4 4 4 20 20 4 4 4 4 12 4. 4. i2 CODE 65 65 65 65 6,5 65 65 65 68 68 68 65 65 65 79 79 65 65 65 65 65 65 68 68 68 68 68 68 68 68 65 65 68 68 68 68 65 68 68 65 Page i8 COMMIENT RECORDS This LIS tmpm was writtan bp Gearhmrt Industrims Wirelinm Servicms. ** All curvm and tool ~n~monics usmd arm thosm which most closmlp ~atch m~ Gmarhart curvm and tool mnmmonics, mm GEARHART TO SCHLUMBERGER MNEM SERVICE UNIT MNEM SERVICE UNIT DEPTH FEET DEPT FT GR2 MERGE GAPI GR MERGE GAPI CCL2 MERGE MV CC[. MERGE MV FCNL2 MERGE CPS FCNL MERGE CPS NCNL2 MERGE CPS NCNL MERGE CPS RAT2 COMPUTED NRAT COMPUT NPHS2 COMPUTED SSPU NPHI COMPUT PU 19 ~ATA :+: * ~ E N T R Y 8 L 0 C K S · :~ :~ m ENTRY ENTRY BLOCK LEGEND TYPE DESCRIPTION FORMA TYPE T ~ .>PEC 1 F I CA i.~ IZE CODE 0 1 66 TIONS Pag~ 20 0 l'e, rminator ( no more. entries ) DATA FORMAT DATUM SPECIFICATION BLOCKS oPECIFICATIONS Pagm 2i SERVICE SERVICE MNEM ID ORDER ~ AP1 AP1 AP1 APl FILE UNIT LOG TYPE CLASS MOD PRC ~ SIZE LVL SMPL RC PROCESS INDICATORS DEPT GR MERGE CCL MERGE FCNL MERGE NCNL MERGE NRAT COMPUT NPHI COMPUT 363684 FT 363684 GAPI ~6~684 MV S63684 CPS 363684 CPS ~6~684 .... ~6~684 PU 0 0 0 0 0 4 0 I 0 54 I 0 2 4 0 0 i50 i 0 2 4 0 1 0 78 S i 0 2 4 0 0 78 ~ 0 0 2 4 0 :0 0 0 0 2 4 0 i 0 i 22 2 0 2 4 0 i 68 68 68 68 68 6,8 6,8 000000 00000'0 OOOO00 000000 O00000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 DEPT 0'4.01 .0:00 RECORDS GR CCL F C 1'..I L N C H L NRAT 0,000 0,000 0. O00 O. 000 -999,250 HPHI 2'1 , ,~60 030I . 000 2.3,2'00 ,440 28.'3,2.00 36'} . 000 I ,287 ;.¢..8 91 0 0201 . 000 23,800 · ,,.. '-' , '"":.;', , 26 050 :-"1 0 ..,09 3:00 .,..,,',.. '1 O0 I 280 . t Ol 0t . 000 28,600 ,930 4~6,600 5I~,200 1,185 23.420 't0001,000 46.200 ,600 4t8,?00 491 .500 1 ,161 22.440 ,~'. :~ ~ FiLE TRAILER mmmm Film name: 8, GSF0t,O~0~ Maximum length: TRAILER RECORDS Film t~pe: LO Vet. sion ~: Next. Date: -'~: EOF :~..:m. EOF