Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAboutPBU CCP-FFGU - Hilcorp North Slope, LLC2. Facility NamePBU CCP/FFGUPercent100.0%19. Remarks:Title:Waste:16. Purchased gas13. Other (see instructions)Lease Use:14. TOTAL VOLUME (ITEMS 6-13)Conservation:11. Assist Gas12. Fuel gas used in lease operations.243,747,6400006,582,9230Form 10-422 Revised 10/20211,837,912235,289,8501,0080I hereby certify that the foregoing is true and correct to the best of my knowledge.15. NGL Gas EquivalentBlock 6: Includes Gas Sales to Alyeska Pipeline, Norgasco, Northstar and KRU; Block 12: Includes COTP Non-PBU Fuel Gas = 2,101 mscf; Block 18: Fuel Gas toLPC = 0 mscfMCFMCFMCFMCFAOGCC Use OnlyAuthorization >1 hr: Date of Revision:Authorized Name and Digital Signature with Date:Contact Phone:(713) 289-2627Note:All volumes must be corrected topressure of 14.65 psia and to a temperature of60° F. Authority 20 AAC 25.235.Contact Email:17. Transferred from: CGF & FS1COMMISSIONER18. Transferred to: (Express as a negative #)Comm. Comm.243,747,6400Reviewed by:bfarouse@hilcorp.com Revision?Pool Code7. ReinjectedPRUDHOE 640150Safety:10. Pilot and Purge35,9479. Flared or vented more than 1 hour (see instr.)STATE OF ALASKAALASKA OIL AND GAS CONSERVATION COMMISSIONFACILITY REPORT OF PRODUCED GAS DISPOSITION1. Facility Number 3. Field 4. Operator 5. Month/Year of DispositionProduction AnalystBeth Farouse 2/16/20240290000000 PBU - EOA HILCORP NORTH SLOPE January-2024Disposition Volume MCF20.For production from multiple pools, list contribution of each pool as a percent ofTotal Volume.6. Sold8. Flared or vented 1 hour or lessPool NameForm 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in DuplicateDigitally signed by Beth Farouse (909)DN: cn=Beth Farouse (909)Date: 2024.02.19 09:09:14 -06'00'Beth Farouse (909) HILCORP ALASKAPRUDHOE BAY UNIT - CENTRAL COMPRESSOR PLANTGAS FLARING AND VENTING INCIDENT REPORTJanuary 2024Unplanned events less than or equal to 1 hourDATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSENot required for events <= 1 hr Not required for events <= 1 hrTOTAL 0Unplanned events greater than 1 hourDATE TIME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSESee Attachments See AttachmentsTOTAL0Planned events less than or equal to 1 hourDATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE1/29/2024 0145:0150 1,008 Not required for events <= 1 hr Not required for events <= 1 hrTOTAL1,008Planned events greater than 1 hourDATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSESee Attachments See AttachmentsTOTAL0 TOTALUnplanned Events < 1 Hour 0Unplanned Events > 1 Hour 0Planned Events < 1 hour and not 1,008exceeding 5,000 MCFPlanned Events > 1 hour or 0exceeding 5,000 MCFPilot Purge35,947Assist0TOTAL FLARED VOLUME 36,955 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 0290000000 2. Facility Name PBU CCP/FFGU 3. Field PBU - EOA 4. Operator HILCORP NORTH SLOPE 5. MonthNear of Disposition Februa -2024 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 1,784,862 Pool Name Pool Code Percent 7. Reinjected 224,453,500 PRUDHOE 640150 100.0% 8. Flared or vented 1 hour or less 314 9. Flared or vented more than 1 hour (see instr.) 0 10. Pilot and Purge 33,657 11. Assist Gas 0 12. Fuel gas used in lease operations. 6,200,250 AOGCC Use Only Authorization >1 hr: Safety: MCF 13. Other (see instructions) O Lease Use: MCF 14. TOTAL VOLUME (ITEMS 6-13) 232,472,583 Conservation: MCF 15. NGL Gas Equivalent O Waste: MCF 16. Purchased gas 0 Reviewed by: COMMISSIONER 17. Transferred from: CGF & FS1 232,472,583 18. Transferred to: (Express as a negative #) 0 Comm. 1comm. 19. Remarks: Block 6: Includes Gas Sales to Alyeska Pipeline, Norgasco, Northstar and KRU; Block 12: Includes COTP Non-PBU Fuel Gas = 2,151 mscf; Block 18: Fuel Gas to LPC = 0 mscf I hereby certify that the foregoing is true and correct to the best of my knowledge. Revision? ❑ Title: Production Analyst Authorized Name and Digital Signature with Date: Digitally signed by Beth Contact Phone: (713) 289-2627 Beth FaroFamuu(909) use Beth Farouse 3/14/2024 (909) DN: cn=Beth Farouse (909) Contact Email: bfarOUSe(Cl�hIlCOrp.COm Date: 2024.03.19 0e:40:02- . Date of Revision: Note: All volumes must be corrected to pressure of 14.65 psis and to a temperature of 60° F. Authority 20 AAC 25,235. Form 10-422 Revised 10/2021 Form 10422 Rev. 512009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate MLTORPADD.A G45 ruNm& AND VEWNG INCIDENT RVDRT February 2020 lunplannea event: less than or equal to l hour wTE nma vaumE DMRIMM OF INCIDENT& Ci Arnox TAKEN TO Cover here CAL11 Not requbetl for events e 1 hr Not requbetl for events e 1 hr TOTAL 0 Unplanned events greater than 1 hour OAR THE DESCRIMCal OF INCIDENT & CAUSE ACEIDN TAKEN TO ELIMI NATE CAUSE See Attachments See Attachments TOTAL 0 Planned events less than arequal to l hour CUSTE have INCIDENT NATE CAUSE E OF I CAUSE EUMI 2/8/2024 DOO9DO10 135Not red, bevents e=l hr Not required for eventse=l hr 21WZ024 0216:0221 1A 2/10/2024 20ss 2030 a 2/10/2024 21082113 d 2f29/202a 1715:17:00 135 2/291 LION 185S la TOTAL 314 Planned everts greater than 1 hour OAR RME VIXUME DvesducUON Oi INCIDENT&CAUSE ACTIOUN TAKEN TO ELIMINATE CAUSE See Attachments See Attachments TOTAL TOTAL unvlannetl e—OI 1 Hour o unvlannetl evema> 3 Hour C Panned Events I l hour a nE not 31a vaMInRE.WDMR fanned Events a l hour a r D vrvervA.WDMR Pict Loch, 33,057 0 TOTAL MRED VOLUME 33.-1 2. Facility NamePBU CCP/FFGUPercent100.0%19. Remarks:Title:STATE OF ALASKAALASKA OIL AND GAS CONSERVATION COMMISSIONFACILITY REPORT OF PRODUCED GAS DISPOSITION1. Facility Number 3. Field 4. Operator 5. Month/Year of DispositionProduction AnalystBeth Farouse 4/15/20240290000000 PBU - EOA HILCORP NORTH SLOPE March-2024Disposition Volume MCF20.For production from multiple pools, list contribution of each pool as a percent ofTotal Volume.6. Sold8. Flared or vented 1 hour or lessPool Name Pool Code7. ReinjectedPRUDHOE 640150Safety:10. Pilot and Purge35,8759. Flared or vented more than 1 hour (see instr.)Contact Phone:(713) 289-2627Note:All volumes must be corrected topressure of 14.65 psia and to a temperature of60° F. Authority 20 AAC 25.235.Contact Email:17. Transferred from: CGF & FS1COMMISSIONER18. Transferred to: (Express as a negative #)Comm. Comm.241,957,6740Reviewed by:bfarouse@hilcorp.com Revision?Form 10-422 Revised 10/20211,788,719233,635,1061,2640I hereby certify that the foregoing is true and correct to the best of my knowledge.15. NGL Gas EquivalentBlock 6: Includes Gas Sales to Alyeska Pipeline, Norgasco, Northstar and KRU; Block 12: Includes COTP Non-PBU Fuel Gas = 3,813 mscf; Block 18: Fuel Gas toLPC = 0 mscfMCFMCFMCFMCFAOGCC Use OnlyAuthorization >1 hr: Date of Revision:Authorized Name and Digital Signature with Date:Waste:16. Purchased gas13. Other (see instructions)Lease Use:14. TOTAL VOLUME (ITEMS 6-13)Conservation:11. Assist Gas12. Fuel gas used in lease operations.241,957,6740006,496,7100Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in DuplicateDigitally signed by Beth Farouse (909)DN: cn=Beth Farouse (909)Date: 2024.04.15 15:04:16 -05'00'Beth Farouse (909) HILCORP ALASKAPRUDHOE BAY UNIT - CENTRAL COMPRESSOR PLANTGAS FLARING AND VENTING INCIDENT REPORTMarch 2024Unplanned events less than or equal to 1 hourDATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE3/16/2024 0057:1302 8 Not required for events <= 1 hrNot required for events <= 1 hr3/16/2024 1534:1539 83/17/2024 1339:1344 1353/18/2024 1752:1757 8TOTAL 159Unplanned events greater than 1 hourDATE TIME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSESee Attachments See AttachmentsTOTAL0Planned events less than or equal to 1 hourDATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE3/8/2024 1421:1426 135 Not required for events <= 1 hrNot required for events <= 1 hr3/11/2024 0716:0721 1353/11/2024 1024:1029 453/11/2024 1053:1058 453/16/2024 0955:1000 513/16/2024 1721:1726 83/16/2024 2101:2106 83/16/2024 2117:2122 83/17/2024 2135:2140 1353/17/2024 2309:2314 143/18/2024 0254:0259 513/18/2024 0419:0424 453/18/2024 1142:1147 1413/18/2024 1520:1525 1413/26/2024 0450:0455 1353/26/2024 0715:0720 8TOTAL1,105Planned events greater than 1 hourDATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSESee Attachments See AttachmentsTOTAL0 TOTALUnplanned Events < 1 Hour 159Unplanned Events > 1 Hour 0Planned Events < 1 hour and not 1,105exceeding 5,000 MCFPlanned Events > 1 hour or 0exceeding 5,000 MCFPilot Purge35,875Assist0TOTAL FLARED VOLUME 37,139 2. Facility NamePBU CCP/FFGUPercent100.0%19. Remarks:Title:Waste:16. Purchased gas13. Other (see instructions)Lease Use:14. TOTAL VOLUME (ITEMS 6-13)Conservation:11. Assist Gas12. Fuel gas used in lease operations.219,104,0750006,172,5130Form 10-422 Revised 10/20211,680,784211,214,6331,4200I hereby certify that the foregoing is true and correct to the best of my knowledge.15. NGL Gas EquivalentBlock 6: Includes Gas Sales to Alyeska Pipeline, Norgasco, Northstar and KRU; Block 12: Includes COTP Non-PBU Fuel Gas = 4,730 mscf; Block 18: Fuel Gas toLPC = 0 mscfMCFMCFMCFMCFAOGCC Use OnlyAuthorization >1 hr: Date of Revision:Authorized Name and Digital Signature with Date:Contact Phone:(713) 289-2627Note:All volumes must be corrected topressure of 14.65 psia and to a temperature of60° F. Authority 20 AAC 25.235.Contact Email:17. Transferred from: CGF & FS1COMMISSIONER18. Transferred to: (Express as a negative #)Comm. Comm.219,104,0750Reviewed by:bfarouse@hilcorp.com Revision?Pool Code7. ReinjectedPRUDHOE 640150Safety:10. Pilot and Purge34,7259. Flared or vented more than 1 hour (see instr.)STATE OF ALASKAALASKA OIL AND GAS CONSERVATION COMMISSIONFACILITY REPORT OF PRODUCED GAS DISPOSITION1. Facility Number 3. Field 4. Operator 5. Month/Year of DispositionProduction AnalystBeth Farouse 5/15/20240290000000 PBU - EOA HILCORP NORTH SLOPE April-2024Disposition Volume MCF20.For production from multiple pools, list contribution of each pool as a percent ofTotal Volume.6. Sold8. Flared or vented 1 hour or lessPool NameForm 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in DuplicateDigitally signed by Beth Farouse (909)DN: cn=Beth Farouse (909)Date: 2024.05.17 16:04:49 -05'00'Beth Farouse (909) HILCORP ALASKAPRUDHOE BAY UNIT - CENTRAL COMPRESSOR PLANTGAS FLARING AND VENTING INCIDENT REPORTApril 2024Unplanned events less than or equal to 1 hourDATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE4/28/2024 1220:1225 156 Not required for events <= 1 hr Not required for events <= 1 hr4/28/2024 1402:1407 84/29/2024 0433:0438 1354/29/2024 0715:0720 84/30/2024 1755:1800 156TOTAL 463Unplanned events greater than 1 hourDATE TIME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSESee Attachments See AttachmentsTOTAL0Planned events less than or equal to 1 hourDATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE4/27/2024 1030:1035 135 Not required for events <= 1 hr Not required for events <= 1 hr4/27/2024 1300:1305 84/27/2024 2110:2115 1354/27/2024 2317:2322 144/28/2024 0026:0031 1564/28/2024 0217:0222 114/28/2024 0710:0715 84/28/2024 1335:1340 84/28/2024 1515:1520 1354/28/2024 1721:1726 84/29/2024 0332:0337 144/30/2024 0404:0409 84/30/2024 0501:0506 1354/30/2024 0725:0730 84/30/2024 1240:1245 144/30/2024 1950:1955 114/30/20242020:20251354/30/2024 2207:2212 14TOTAL957Planned events greater than 1 hourDATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSESee Attachments See AttachmentsTOTAL0 TOTALUnplanned Events < 1 Hour 463Unplanned Events > 1 Hour 0Planned Events < 1 hour and not 957exceeding 5,000 MCFPlanned Events > 1 hour or 0exceeding 5,000 MCFPilot Purge34,725Assist0TOTAL FLARED VOLUME 36,145 2. Facility NamePBU CCP/FFGUPercent100.0%19. Remarks:Title:Waste:16. Purchased gas13. Other (see instructions)Lease Use:14. TOTAL VOLUME (ITEMS 6-13)Conservation:11. Assist Gas12. Fuel gas used in lease operations.223,088,9020006,343,4980Form 10-422 Revised 10/20211,683,091215,023,1243,3170I hereby certify that the foregoing is true and correct to the best of my knowledge.15. NGL Gas EquivalentBlock 6: Includes Gas Sales to Alyeska Pipeline, Norgasco, Northstar and KRU; Block 12: Includes COTP Non-PBU Fuel Gas = 5,044 mscf; Block 18: Fuel Gas toLPC = 0 mscfMCFMCFMCFMCFAOGCC Use OnlyAuthorization >1 hr: Date of Revision:Authorized Name and Digital Signature with Date:Contact Phone:(713) 289-2627Note:All volumes must be corrected topressure of 14.65 psia and to a temperature of60° F. Authority 20 AAC 25.235.Contact Email:17. Transferred from: CGF & FS1COMMISSIONER18. Transferred to: (Express as a negative #)Comm. Comm.223,088,9020Reviewed by:bfarouse@hilcorp.com Revision?Pool Code7. ReinjectedPRUDHOE 640150Safety:10. Pilot and Purge35,8729. Flared or vented more than 1 hour (see instr.)STATE OF ALASKAALASKA OIL AND GAS CONSERVATION COMMISSIONFACILITY REPORT OF PRODUCED GAS DISPOSITION1. Facility Number 3. Field 4. Operator 5. Month/Year of DispositionProduction AnalystBeth Farouse 6/17/20240290000000 PBU - EOA HILCORP NORTH SLOPE May-2024Disposition Volume MCF20.For production from multiple pools, list contribution of each pool as a percent ofTotal Volume.6. Sold8. Flared or vented 1 hour or lessPool NameForm 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in DuplicateDigitally signed by Beth Farouse (909)DN: cn=Beth Farouse (909)Date: 2024.06.18 17:26:46 -05'00'Beth Farouse (909) HILCORP ALASKAPRUDHOE BAY UNIT - CENTRAL COMPRESSOR PLANTGAS FLARING AND VENTING INCIDENT REPORTMay 2024Unplanned events less than or equal to 1 hourDATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE5/3/2024 0000:0005 8 Not required for events <= 1 hr Not required for events <= 1 hr5/5/2024 0921:0926 1095/5/2024 0938:0943 109TOTAL 226Unplanned events greater than 1 hourDATE TIME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSESee Attachments See AttachmentsTOTAL0Planned events less than or equal to 1 hourDATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE5/1/2024 0709:0714 141 Not required for events <= 1 hr Not required for events <= 1 hr5/1/2024 0907:0912 85/2/2024 1251:1258 1565/2/2024 0303:0308 115/2/2024 0926:0931 1355/2/2024 1444:1449 145/2/2024 2232:2237 455/2/2024 2248:2258 115/3/2024 1020:1025 4085/3/2024 1435:1441 1525/5/2024 0355:0400 1525/5/2024 0854:0859 4085/5/2024 2144:2149 4085/30/2024 0306:0320 4335/30/2024 1533:1535 4605/30/2024 2008:2013 1355/30/20242228:223214TOTAL3,091Planned events greater than 1 hourDATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSESee Attachments See AttachmentsTOTAL0 TOTALUnplanned Events < 1 Hour 226Unplanned Events > 1 Hour 0Planned Events < 1 hour and not 3,091exceeding 5,000 MCFPlanned Events > 1 hour or 0exceeding 5,000 MCFPilot Purge35,872Assist0TOTAL FLARED VOLUME 39,189 2. Facility NamePBU CCP/FFGUPercent100.0%19. Remarks:Title:Waste:16. Purchased gas13. Other (see instructions)Lease Use:14. TOTAL VOLUME (ITEMS 6-13)Conservation:11. Assist Gas12. Fuel gas used in lease operations.199,746,4640005,701,3980Form 10-422 Revised 10/20211,217,640192,790,0672,5250I hereby certify that the foregoing is true and correct to the best of my knowledge.15. NGL Gas EquivalentBlock 6: Includes Gas Sales to Alyeska Pipeline, Norgasco, Northstar and KRU; Block 12: Includes COTP Non-PBU Fuel Gas = 7,262 mscf; Block 18: Fuel Gas toLPC = 0 mscfMCFMCFMCFMCFAOGCC Use OnlyAuthorization >1 hr: Date of Revision:Authorized Name and Digital Signature with Date:Contact Phone:(713) 289-2627Note:All volumes must be corrected topressure of 14.65 psia and to a temperature of60° F. Authority 20 AAC 25.235.Contact Email:17. Transferred from: CGF & FS1COMMISSIONER18. Transferred to: (Express as a negative #)Comm. Comm.199,746,4640Reviewed by:bfarouse@hilcorp.com Revision?Pool Code7. ReinjectedPRUDHOE 640150Safety:10. Pilot and Purge34,8349. Flared or vented more than 1 hour (see instr.)STATE OF ALASKAALASKA OIL AND GAS CONSERVATION COMMISSIONFACILITY REPORT OF PRODUCED GAS DISPOSITION1. Facility Number 3. Field 4. Operator 5. Month/Year of DispositionProduction AnalystBeth Farouse 7/16/20240290000000 PBU - EOA HILCORP NORTH SLOPE June-2024Disposition Volume MCF20.For production from multiple pools, list contribution of each pool as a percent ofTotal Volume.6. Sold8. Flared or vented 1 hour or lessPool NameForm 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in DuplicateDigitally signed by Beth Farouse (909)DN: cn=Beth Farouse (909)Date: 2024.07.16 15:14:53 -05'00'BethFarouse(909) ,/>KZW>^<WZh,KzhE/dͲEdZ>KDWZ^^KZW>Ed'^&>Z/E'EsEd/E'/E/EdZWKZd:ƵŶĞϮϬϮϰhŶƉůĂŶŶĞĚĞǀĞŶƚƐůĞƐƐƚŚĂŶŽƌĞƋƵĂůƚŽϭŚŽƵƌd d/D sK>hD ^Z/Wd/KEK&/E/EdΘh^ d/KEd<EdK>/D/Edh^ϲͬϭϭͬϮϬϮϰ ϬϭϯϬ͗Ϭϭϯϱ ϰϬϴ EŽƚƌĞƋƵŝƌĞĚĨŽƌĞǀĞŶƚƐфсϭŚƌ EŽƚƌĞƋƵŝƌĞĚĨŽƌĞǀĞŶƚƐфсϭŚƌϲͬϭϭͬϮϬϮϰ ϬϭϱϬ͗Ϭϭϱϱ ϭϯϱϲͬϭϭͬϮϬϮϰ Ϭϭϱϱ͗ϬϮϬϬ ϰϯϲͬϭϭͬϮϬϮϰ ϬϯϮϴ͗Ϭϯϯϯ ϭϬϵϲͬϭϭͬϮϬϮϰ Ϭϰϭϱ͗ϬϰϮϬ ϴϲͬϭϯͬϮϬϮϰ ϬϴϮϯ͗ϬϴϮϳ ϭϯϱϲͬϭϰͬϮϬϮϰ Ϭϭϰϱ͗ϬϭϱϬ ϰϬϴϲͬϭϰͬϮϬϮϰ ϬϮϮϮ͗ϬϮϮϳ ϭϬϵϲͬϭϰͬϮϬϮϰ ϬϮϯϬ͗ϬϮϯϱ ϭϬϵϲͬϭϰͬϮϬϮϰ ϬϮϱϱ͗ϬϯϬϬ ϭϬϵϲͬϭϰͬϮϬϮϰ ϬϯϮϱ͗ϬϯϯϬ ϭϬϵϲͬϭϰͬϮϬϮϰ ϬϰϭϬ͗Ϭϰϭϱ ϭϬϵϲͬϭϳͬϮϬϮϰ ϭϵϰϱ͗ϭϵϱϬ ϴϲͬϭϳͬϮϬϮϰ ϮϬϬϬ͗ϮϬϬϱ ϴϲͬϭϳͬϮϬϮϰ ϮϬϰϱ͗ϮϬϱϬ ϰϱϲͬϭϳͬϮϬϮϰ ϮϭϭϬ͗Ϯϭϭϱ ϭϰϲͬϭϳͬϮϬϮϰ ϮϮϯϬ͗ϮϮϯϱ ϰϱϲͬϭϳͬϮϬϮϰ Ϯϯϭϱ͗ϮϯϮϬ ϰϱϲͬϭϴͬϮϬϮϰ ϭϵϮϬ͗ϭϵϮϱ ϭϯϱϲͬϭϴͬϮϬϮϰ Ϯϭϰϱ͗ϮϭϱϬ ϴϲͬϭϵͬϮϬϮϰ ϭϬϯϴ͗ϭϬϰϯ ϭϯϱϲͬϭϵͬϮϬϮϰ ϭϯϭϭ͗ϭϯϭϲ ϭϯϱϲͬϭϵͬϮϬϮϰ ϭϰϭϵ͗ϭϰϮϰ ϴdKd> Ϯ͕ϯϳϳhŶƉůĂŶŶĞĚĞǀĞŶƚƐŐƌĞĂƚĞƌƚŚĂŶϭŚŽƵƌd d/D  ^Z/Wd/KEK&/E/EdΘh^ d/KEd<EdK>/D/Edh^^ĞĞƚƚĂĐŚŵĞŶƚƐ ^ĞĞƚƚĂĐŚŵĞŶƚƐdKd>ϬWůĂŶŶĞĚĞǀĞŶƚƐůĞƐƐƚŚĂŶŽƌĞƋƵĂůƚŽϭŚŽƵƌd d/D sK>hD ^Z/Wd/KEK&/E/EdΘh^ d/KEd<EdK>/D/Edh^ϲͬϭϯͬϮϬϮϰ Ϭϵϭϰ͗Ϭϵϭϵ ϭϰ EŽƚƌĞƋƵŝƌĞĚĨŽƌĞǀĞŶƚƐфсϭŚƌ EŽƚƌĞƋƵŝƌĞĚĨŽƌĞǀĞŶƚƐфсϭŚƌϲͬϭϳͬϮϬϮϰ ϭϲϮϬ͗ϭϲϮϱ ϰϱϲͬϭϳͬϮϬϮϰ ϭϳϯϮ͗ϭϳϯϳ ϭϰϲͬϭϳͬϮϬϮϰ ϭϴϱϬ͗ϭϴϱϱ ϴϲͬϭϳͬϮϬϮϰ ϭϵϭϱ͗ϭϵϮϬ ϴϲͬϭϴͬϮϬϮϰ ϭϰϬϳ͗ϭϰϭϮ ϰϱϲͬϭϴͬϮϬϮϰ ϭϱϬϯ͗ϭϱϬϴ ϭϰdKd>ϭϰϴWůĂŶŶĞĚĞǀĞŶƚƐŐƌĞĂƚĞƌƚŚĂŶϭŚŽƵƌd d/D sK>hD ^Z/Wd/KEK&/E/EdΘh^ d/KEd<EdK>/D/Edh^^ĞĞƚƚĂĐŚŵĞŶƚƐ ^ĞĞƚƚĂĐŚŵĞŶƚƐdKd>ϬdKd>hŶƉůĂŶŶĞĚǀĞŶƚƐфϭ,ŽƵƌϮ͕ϯϳϳhŶƉůĂŶŶĞĚǀĞŶƚƐхϭ,ŽƵƌϬWůĂŶŶĞĚǀĞŶƚƐфϭŚŽƵƌĂŶĚŶŽƚ ϭϰϴĞdžĐĞĞĚŝŶŐϱ͕ϬϬϬD&WůĂŶŶĞĚǀĞŶƚƐхϭŚŽƵƌŽƌϬĞdžĐĞĞĚŝŶŐϱ͕ϬϬϬD&WŝůŽƚWƵƌŐĞƐƐŝƐƚdKd>&>ZsK>hD ϯϳ͕ϯϱϵ 2. Facility NamePBU CCP/FFGUPercent100.0%19. Remarks:Title:Waste:16. Purchased gas13. Other (see instructions)Lease Use:14. TOTAL VOLUME (ITEMS 6-13)Conservation:11. Assist Gas12. Fuel gas used in lease operations.203,277,9650005,587,3820Form 10-422 Revised 10/20211,582,283196,072,0801490I hereby certify that the foregoing is true and correct to the best of my knowledge.15. NGL Gas EquivalentBlock 6: Includes Gas Sales to Alyeska Pipeline, Norgasco, Northstar and KRU; Block 12: Includes COTP Non-PBU Fuel Gas = 4,193 mscf; Block 18: Fuel Gas toLPC = 0 mscfMCFMCFMCFMCFAOGCC Use OnlyAuthorization >1 hr: Date of Revision:Authorized Name and Digital Signature with Date:Contact Phone:(713) 289-2627Note:All volumes must be corrected topressure of 14.65 psia and to a temperature of60° F. Authority 20 AAC 25.235.Contact Email:17. Transferred from: CGF & FS1COMMISSIONER18. Transferred to: (Express as a negative #)Comm. Comm.203,277,9650Reviewed by:bfarouse@hilcorp.com Revision?Pool Code7. ReinjectedPRUDHOE 640150Safety:10. Pilot and Purge36,0719. Flared or vented more than 1 hour (see instr.)STATE OF ALASKAALASKA OIL AND GAS CONSERVATION COMMISSIONFACILITY REPORT OF PRODUCED GAS DISPOSITION1. Facility Number 3. Field 4. Operator 5. Month/Year of DispositionProduction AnalystBeth Farouse 8/14/20240290000000 PBU - EOA HILCORP NORTH SLOPE July-2024Disposition Volume MCF20.For production from multiple pools, list contribution of each pool as a percent ofTotal Volume.6. Sold8. Flared or vented 1 hour or lessPool NameForm 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in DuplicateDigitally signed by Beth Farouse (909)DN: cn=Beth Farouse (909)Date: 2024.08.16 15:05:31 -05'00'BethFarouse(909)Beth FarousDN: cn=BeFarouseDate: 1house9)eth Farous=Besete: 1hous9)cn=rousateDNFarDseeDigitally signed by Beth Farouse (909)DN: cn=Beth Farouse (909)Date: 2024.08.19 09:21:13 -05'00'BethFarouse(909) HILCORP ALASKAPRUDHOE BAY UNIT - CENTRAL COMPRESSOR PLANTGAS FLARING AND VENTING INCIDENT REPORTJuly 2024Unplanned events less than or equal to 1 hourDATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSENot required for events <= 1 hr Not required for events <= 1 hrTOTAL 0Unplanned events greater than 1 hourDATE TIME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSESee Attachments See AttachmentsTOTAL0Planned events less than or equal to 1 hourDATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE7/11/2024 1753:1758 135 Not required for events <= 1 hr Not required for events <= 1 hr7/11/2024 2018:2023 14TOTAL149Planned events greater than 1 hourDATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSESee Attachments See AttachmentsTOTAL0 TOTALUnplanned Events < 1 Hour 0Unplanned Events > 1 Hour 0Planned Events < 1 hour and not 149exceeding 5,000 MCFPlanned Events > 1 hour or 0exceeding 5,000 MCFPilot Purge36,071Assist0TOTAL FLARED VOLUME 36,220 2. Facility NamePBU CCP/FFGUPercent100.0%19. Remarks:Title:Waste:16. Purchased gas13. Other (see instructions)Lease Use:14. TOTAL VOLUME (ITEMS 6-13)Conservation:11. Assist Gas12. Fuel gas used in lease operations.196,460,7860005,257,2770Form 10-422 Revised 10/20211,585,574189,580,5641,2410I hereby certify that the foregoing is true and correct to the best of my knowledge.15. NGL Gas EquivalentBlock 6: Includes Gas Sales to Alyeska Pipeline, Norgasco, Northstar and KRU; Block 12: Includes COTP Non-PBU Fuel Gas = 3,037 mscf; Block 18: Fuel Gas toLPC = 0 mscfMCFMCFMCFMCFAOGCC Use OnlyAuthorization >1 hr: Date of Revision:Authorized Name and Digital Signature with Date:Contact Phone:(713) 289-2627Note:All volumes must be corrected topressure of 14.65 psia and to a temperature of60° F. Authority 20 AAC 25.235.Contact Email:17. Transferred from: CGF & FS1COMMISSIONER18. Transferred to: (Express as a negative #)Comm. Comm.196,460,7860Reviewed by:bfarouse@hilcorp.com Revision?Pool Code7. ReinjectedPRUDHOE 640150Safety:10. Pilot and Purge36,1309. Flared or vented more than 1 hour (see instr.)STATE OF ALASKAALASKA OIL AND GAS CONSERVATION COMMISSIONFACILITY REPORT OF PRODUCED GAS DISPOSITION1. Facility Number 3. Field 4. Operator 5. Month/Year of DispositionProduction AnalystBeth Farouse 9/18/20240290000000 PBU - EOA HILCORP NORTH SLOPE August-2024Disposition Volume MCF20.For production from multiple pools, list contribution of each pool as a percent ofTotal Volume.6. Sold8. Flared or vented 1 hour or lessPool NameForm 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in DuplicateDigitally signed by Beth Farouse (909)DN: cn=Beth Farouse (909)Date: 2024.09.19 09:56:21 -05'00'BethFarouse(909) HILCORP ALASKAPRUDHOE BAY UNIT - CENTRAL COMPRESSOR PLANTGAS FLARING AND VENTING INCIDENT REPORTAugust 2024Unplanned events less than or equal to 1 hourDATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE8/1/2024 1527:1532 14 Not required for events <= 1 hr Not required for events <= 1 hr8/1/2024 1559:1604 148/1/2024 1734:1739 88/6/2024 1049:1054 1358/6/2024 1226:1242 1358/7/2024 0939:0944 135TOTAL 441Unplanned events greater than 1 hourDATE TIME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSESee Attachments See AttachmentsTOTAL0Planned events less than or equal to 1 hourDATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE8/1/2024 1226:1231 6 Not required for events <= 1 hr Not required for events <= 1 hr8/1/2024 1326:1331 518/1/2024 1940:1945 88/2/2024 1009:1014 1358/2/2024 1357:1402 148/4/2024 0750:0755 1358/6/2024 1410:1415 1358/26/2024 1206:1211 1568/26/2024 0255:0300 118/26/2024 1135:1140 1358/26/2024 1411:1416 14TOTAL800Planned events greater than 1 hourDATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSESee Attachments See AttachmentsTOTAL0 TOTALUnplanned Events < 1 Hour 441Unplanned Events > 1 Hour 0Planned Events < 1 hour and not 800exceeding 5,000 MCFPlanned Events > 1 hour or 0exceeding 5,000 MCFPilot Purge36,130Assist0TOTAL FLARED VOLUME 37,371 2. Facility NamePBU CCP/FFGUPercent100.0%19. Remarks:Title:Waste:16. Purchased gas13. Other (see instructions)Lease Use:14. TOTAL VOLUME (ITEMS 6-13)Conservation:11. Assist Gas12. Fuel gas used in lease operations.197,666,4980005,395,5810Form 10-422 Revised 10/20211,614,412190,621,2982660I hereby certify that the foregoing is true and correct to the best of my knowledge.15. NGL Gas EquivalentBlock 6: Includes Gas Sales to Alyeska Pipeline, Norgasco, Northstar and KRU; Block 12: Includes COTP Non-PBU Fuel Gas = 6,926 mscf; Block 18: Fuel Gas toLPC = 0 mscfMCFMCFMCFMCFAOGCC Use OnlyAuthorization >1 hr: Date of Revision:Authorized Name and Digital Signature with Date:Contact Phone:(713) 289-2627Note:All volumes must be corrected topressure of 14.65 psia and to a temperature of60° F. Authority 20 AAC 25.235.Contact Email:17. Transferred from: CGF & FS1COMMISSIONER18. Transferred to: (Express as a negative #)Comm. Comm.197,666,4980Reviewed by:bfarouse@hilcorp.com Revision?Pool Code7. ReinjectedPRUDHOE 640150Safety:10. Pilot and Purge34,9419. Flared or vented more than 1 hour (see instr.)STATE OF ALASKAALASKA OIL AND GAS CONSERVATION COMMISSIONFACILITY REPORT OF PRODUCED GAS DISPOSITION1. Facility Number 3. Field 4. Operator 5. Month/Year of DispositionProduction AnalystBeth Farouse 10/16/20240290000000 PBU - EOA HILCORP NORTH SLOPE September-2024Disposition Volume MCF20.For production from multiple pools, list contribution of each pool as a percent ofTotal Volume.6. Sold8. Flared or vented 1 hour or lessPool NameForm 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in DuplicateDigitally signed by Beth Farouse (909)DN: cn=Beth Farouse (909)Date: 2024.10.17 10:33:56 -05'00'BethFarouse(909) HILCORP ALASKAPRUDHOE BAY UNIT - CENTRAL COMPRESSOR PLANTGAS FLARING AND VENTING INCIDENT REPORTSeptember 2024Unplanned events less than or equal to 1 hourDATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSENot required for events <= 1 hr Not required for events <= 1 hrTOTAL 0Unplanned events greater than 1 hourDATE TIME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSESee Attachments See AttachmentsTOTAL0Planned events less than or equal to 1 hourDATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE9/15/2024 0230:0235 77 Not required for events <= 1 hr Not required for events <= 1 hr9/15/2024 0645:0650 779/15/2024 1730:1735 89/15/2024 1945:1950 809/15/2024 2010:2015 89/15/2024 2025:2030 89/22/2024 1645:1650 8TOTAL266Planned events greater than 1 hourDATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSESee Attachments See AttachmentsTOTAL0 TOTALUnplanned Events < 1 Hour 0Unplanned Events > 1 Hour 0Planned Events < 1 hour and not 266exceeding 5,000 MCFPlanned Events > 1 hour or 0exceeding 5,000 MCFPilot Purge34,941Assist0TOTAL FLARED VOLUME 35,207 2. Facility NamePBU CCP/FFGUPercent100.0%19. Remarks:Title:STATE OF ALASKAALASKA OIL AND GAS CONSERVATION COMMISSIONFACILITY REPORT OF PRODUCED GAS DISPOSITION1. Facility Number 3. Field 4. Operator 5. Month/Year of DispositionProduction AnalystBeth Farouse 11/14/20240290000000 PBU - EOA HILCORP NORTH SLOPE October-2024Disposition Volume MCF20.For production from multiple pools, list contribution of each pool as a percent ofTotal Volume.6. Sold8. Flared or vented 1 hour or lessPool Name Pool Code7. ReinjectedPRUDHOE 640150Safety:10. Pilot and Purge36,1269. Flared or vented more than 1 hour (see instr.)Contact Phone:(713) 289-2627Note:All volumes must be corrected topressure of 14.65 psia and to a temperature of60° F. Authority 20 AAC 25.235.Contact Email:17. Transferred from: CGF & FS1COMMISSIONER18. Transferred to: (Express as a negative #)Comm. Comm.222,857,5220Reviewed by:bfarouse@hilcorp.com Revision?Form 10-422 Revised 10/20211,724,406214,965,4612,6510I hereby certify that the foregoing is true and correct to the best of my knowledge.15. NGL Gas EquivalentBlock 6: Includes Gas Sales to Alyeska Pipeline, Norgasco, Northstar and KRU; Block 12: Includes COTP Non-PBU Fuel Gas = 3,127 mscf; Block 18: Fuel Gas toLPC = 0 mscfMCFMCFMCFMCFAOGCC Use OnlyAuthorization >1 hr: Date of Revision:Authorized Name and Digital Signature with Date:Waste:16. Purchased gas13. Other (see instructions)Lease Use:14. TOTAL VOLUME (ITEMS 6-13)Conservation:11. Assist Gas12. Fuel gas used in lease operations.222,857,5220006,128,8780Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in DuplicateDigitally signed by Beth Farouse (909)DN: cn=Beth Farouse (909)Date: 2024.11.18 14:14:17 -06'00'BethFarouse(909) HILCORP ALASKAPRUDHOE BAY UNIT - CENTRAL COMPRESSOR PLANTGAS FLARING AND VENTING INCIDENT REPORTOctober 2024Unplanned events less than or equal to 1 hourDATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE10/6/2024 0930:0935 135 Not required for events <= 1 hr Not required for events <= 1 hr10/13/2024 0340:0345 810/14/2024 0145:0150 13510/14/2024 0821:0826 13510/14/2024 2030:2035 109TOTAL 522Unplanned events greater than 1 hourDATE TIME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSESee Attachments See AttachmentsTOTAL0Planned events less than or equal to 1 hourDATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE10/10/2024 2340:2345 135 Not required for events <= 1 hr Not required for events <= 1 hr10/11/2024 0025:0030 810/11/2024 0230:0235 1410/11/2024 0300:0305 15610/11/2024 0500:0505 810/11/2024 1634:1639 810/11/2024 1850:1855 1110/12/2024 0040:0045 15610/12/2024 0300:0305 1110/12/2024 0726:0731 810/12/2024 0840:0845 8010/12/2024 1427:1432 13510/12/2024 1700:1705 1410/13/2024 0500:0505 13510/13/2024 0748:0753 810/13/2024 1538:1543 13510/13/2024 1805:1810 810/13/2024 2354:2359 13510/14/2024 0720:0725 13510/14/20241131:1136810/14/2024 1940:1945 40810/14/2024 2305:2310 15210/16/2024 1744:1749 15210/16/2024 2025:2030 109TOTAL2,129Planned events greater than 1 hourDATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSESee Attachments See AttachmentsTOTAL0 TOTALUnplanned Events < 1 Hour 522Unplanned Events > 1 Hour 0Planned Events < 1 hour and not 2,129exceeding 5,000 MCFPlanned Events > 1 hour or 0exceeding 5,000 MCFPilot Purge36,126Assist0TOTAL FLARED VOLUME 38,777 2. Facility NamePBU CCP/FFGUPercent100.0%19. Remarks:Title:STATE OF ALASKAALASKA OIL AND GAS CONSERVATION COMMISSIONFACILITY REPORT OF PRODUCED GAS DISPOSITION1. Facility Number 3. Field 4. Operator 5. Month/Year of DispositionProduction AnalystBeth Farouse 12/16/20230290000000 PBU - EOA HILCORP NORTH SLOPE November-2024Disposition Volume MCF20.For production from multiple pools, list contribution of each pool as a percent ofTotal Volume.6. Sold8. Flared or vented 1 hour or lessPool Name Pool Code7. ReinjectedPRUDHOE 640150Safety:10. Pilot and Purge34,9509. Flared or vented more than 1 hour (see instr.)Contact Phone:(713) 289-2627Note:All volumes must be corrected topressure of 14.65 psia and to a temperature of60° F. Authority 20 AAC 25.235.Contact Email:17. Transferred from: CGF & FS1COMMISSIONER18. Transferred to: (Express as a negative #)Comm. Comm.230,382,7340Reviewed by:bfarouse@hilcorp.com Revision?Form 10-422 Revised 10/20211,738,782222,290,6341,4380I hereby certify that the foregoing is true and correct to the best of my knowledge.15. NGL Gas EquivalentBlock 6: Includes Gas Sales to Alyeska Pipeline, Norgasco, Northstar and KRU; Block 12: Includes COTP Non-PBU Fuel Gas = 3,256 mscf; Block 18: Fuel Gas toLPC = 0 mscfMCFMCFMCFMCFAOGCC Use OnlyAuthorization >1 hr: Date of Revision:Authorized Name and Digital Signature with Date:Waste:16. Purchased gas13. Other (see instructions)Lease Use:14. TOTAL VOLUME (ITEMS 6-13)Conservation:11. Assist Gas12. Fuel gas used in lease operations.230,382,7340006,316,9300Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in DuplicateDigitally signed by Beth Farouse (909)DN: cn=Beth Farouse (909)Date: 2024.12.18 10:32:31 -06'00'BethFarouse(909) HILCORP ALASKAPRUDHOE BAY UNIT - CENTRAL COMPRESSOR PLANTGAS FLARING AND VENTING INCIDENT REPORTNovember 2024Unplanned events less than or equal to 1 hourDATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE11/11/2024 0821:0826 156 Not required for events <= 1 hr Not required for events <= 1 hr11/11/2024 0928:0933 40811/11/2024 1320:1325 152TOTAL 716Unplanned events greater than 1 hourDATE TIME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSESee Attachments See AttachmentsTOTAL0Planned events less than or equal to 1 hourDATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE11/16/2024 0018:0023 156 Not required for events <= 1 hr Not required for events <= 1 hr11/16/2024 0217:0222 1111/16/2024 1046:1051 13511/16/2024 1242:1247 1411/16/2024 1935:1940 15611/16/2024 2129:2134 1111/20/2024 2250:2255 13511/21/2024 0204:0209 811/21/2024 2320:2325 7711/22/2024 0805:0810 1111/22/2024 2010:2015 8TOTAL722Planned events greater than 1 hourDATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSESee Attachments See AttachmentsTOTAL0 TOTALUnplanned Events < 1 Hour 716Unplanned Events > 1 Hour 0Planned Events < 1 hour and not 722exceeding 5,000 MCFPlanned Events > 1 hour or 0exceeding 5,000 MCFPilot Purge34,950Assist0TOTAL FLARED VOLUME 36,388 2. Facility NamePBU CCP/FFGUPercent100.0%19. Remarks:Title:Waste:16. Purchased gas13. Other (see instructions)Lease Use:14. TOTAL VOLUME (ITEMS 6-13)Conservation:11. Assist Gas12. Fuel gas used in lease operations.243,391,6140006,642,5340Form 10-422 Revised 10/20211,909,277234,800,6423,2760I hereby certify that the foregoing is true and correct to the best of my knowledge.15. NGL Gas EquivalentBlock 6: Includes Gas Sales to Alyeska Pipeline, Norgasco, Northstar and KRU; Block 12: Includes COTP Non-PBU Fuel Gas = 3,827 mscf; Block 18: Fuel Gas toLPC = 0 mscfMCFMCFMCFMCFAOGCC Use OnlyAuthorization >1 hr: Date of Revision:Authorized Name and Digital Signature with Date:Contact Phone:(713) 289-2627Note:All volumes must be corrected topressure of 14.65 psia and to a temperature of60° F. Authority 20 AAC 25.235.Contact Email:17. Transferred from: CGF & FS1COMMISSIONER18. Transferred to: (Express as a negative #)Comm. Comm.243,391,6140Reviewed by:bfarouse@hilcorp.com Revision?Pool Code7. ReinjectedPRUDHOE 640150Safety:10. Pilot and Purge35,8859. Flared or vented more than 1 hour (see instr.)STATE OF ALASKAALASKA OIL AND GAS CONSERVATION COMMISSIONFACILITY REPORT OF PRODUCED GAS DISPOSITION1. Facility Number 3. Field 4. Operator 5. Month/Year of DispositionProduction AnalystBeth Farouse 1/17/20250290000000 PBU - EOA HILCORP NORTH SLOPE December-2024Disposition Volume MCF20.For production from multiple pools, list contribution of each pool as a percent ofTotal Volume.6. Sold8. Flared or vented 1 hour or lessPool NameForm 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in DuplicateDigitally signed by Beth Farouse (909)DN: cn=Beth Farouse (909)Date: 2025.01.19 17:34:42 -09'00'Beth Farouse (909) HILCORP ALASKAPRUDHOE BAY UNIT - CENTRAL COMPRESSOR PLANTGAS FLARING AND VENTING INCIDENT REPORTDecember 2024Unplanned events less than or equal to 1 hourDATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE12/1/2024 1430:1435 135 Not required for events <= 1 hr Not required for events <= 1 hr12/17/2025 0421:0426 40812/17/2025 0602:0607 40812/27/2025 0321:0335 280TOTAL 1,231Unplanned events greater than 1 hourDATE TIME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSESee Attachments See AttachmentsTOTAL0Planned events less than or equal to 1 hourDATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE12/16/2024 2349:2354 408 Not required for events <= 1 hr Not required for events <= 1 hr12/17/2024 1035:1040 59612/29/2025 1933:1957 1,041TOTAL2,045Planned events greater than 1 hourDATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSESee Attachments See AttachmentsTOTAL0 TOTALUnplanned Events < 1 Hour 1,231Unplanned Events > 1 Hour 0Planned Events < 1 hour and not 2,045exceeding 5,000 MCFPlanned Events > 1 hour or 0exceeding 5,000 MCFPilot Purge35,885Assist0TOTAL FLARED VOLUME 39,161