HomeMy WebLinkAboutPBU FS2 - Hilcorp North Slope, LLC2. Facility NamePBU FS 2Percent100.0%19. Remarks:Title:Form 10-422 Revised 10/2021=I hereby certify that the foregoing is true and correct to the best of my knowledge. Revision? Date of Revision:Authorized Name and Digital Signature with Date:Contact Phone:(713) 289-2627Note:All volumes must be corrected topressure of 14.65 psia and to a temperature of60° F. Authority 20 AAC 25.235.Contact Email:Production AnalystBeth Farouse 2/16/202418. Transferred to: (Express as a negative #)-21,145,011Comm. Comm.bfarouse@hilcorp.comMCF15. NGL Gas Equivalent0Waste: MCF16. Purchased gas0Reviewed by:17. Transferred from: CGF & FS1285,633COMMISSIONERMCF13. Other (see instructions)0Lease Use: MCF14. TOTAL VOLUME (ITEMS 6-13)758,057Conservation:12. Fuel gas used in lease operations.736,392AOGCC Use OnlyAuthorization >1 hr:Safety:11. Assist Gas2,47810. Pilot and Purge12,8469. Flared or vented more than 1 hour (see instr.)7698. Flared or vented 1 hour or less5,5720290000029 PBU - EOA HILCORP NORTH SLOPE January-2024Disposition Volume MCF20.For production from multiple pools, list contribution of each pool as a percent ofTotal Volume.6. Sold0Pool Name Pool Code7. Reinjected0PRUDHOE 640150STATE OF ALASKAALASKA OIL AND GAS CONSERVATION COMMISSIONFACILITY REPORT OF PRODUCED GAS DISPOSITION1. Facility Number 3. Field 4. Operator 5. Month/Year of DispositionForm 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in DuplicateDigitally signed by Beth Farouse (909)DN: cn=Beth Farouse (909)Date: 2024.02.19 09:10:26 -06'00'Beth Farouse (909):&%JLC 11/6/2024
HILCORP ALASKAPRUDHOE BAY UNIT - FS-2GAS FLARING AND VENTING INCIDENT REPORTJanuary 2024Unplanned events less than or equal to 1 hourDATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE1/2/2024 1504:1510 24 Not required for events <= 1 hr Not required for events <= 1 hr1/2/2024 2150:2155 241/2/2024 2200:2207 241/6/2024 0717:0757 5,500TOTAL 5,572Unplanned events greater than 1 hourDATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE1/16/2024 0530:1330 769 See Attachments See AttachmentsTOTAL769Planned events less than or equal to 1 hourDATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSENot required for events <= 1 hr Not required for events <= 1 hrTOTAL0Planned events greater than 1 hourDATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSESee Attachments See AttachmentsTOTAL0 TOTALUnplanned Events < 1 Hour 5,572Unplanned Events > 1 Hour 769Planned Events < 1 hour and not 0exceeding 5,000 MCFPlanned Events > 1 hour or0exceeding 5,000 MCFPilot Purge 12,846Assist 2,478TOTAL FLARED VOLUME 21,665
7'+
!"## $ !
(%
4%3 E2 #
5/)!
3%
&!,
6
?% '
%"
#4
!
!,7
!%!!7
'
)%*+%,-./(0#
7'+
1
!# 2."&3#
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number
0290000029
2. Facility Name
PBU FS 2
3. Field
PBU - EOA
4. Operator
HILCORP NORTH SLOPE
5. MonthlYear of Disposition
I Februa -2024
Disposition
Volume MCF
20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold
0
Pool Name
Pool Code
Percent
7. Reinjected
0
PRUDHOE
640150
100.0%
8. Flared or vented 1 hour or less
0
9. Flared or vented more than 1 hour (see instr.)
0
10. Pilot and Purge
11,970
11. Assist Gas
53
12. Fuel gas used in lease operations.
720,927
AOGCC Use Only
Authorization >1 hr:
Safety:
MCF
13. Other (see instructions)
0
Lease Use:
MCF
14. TOTAL VOLUME (ITEMS 6-13)
732,950
Conservation:
MCF
15. NGL Gas Equivalent
0
Waste:
MCF
16. Purchased gas
0
Reviewed by:
COMMISSIONER
17. Transferred from: CGF & FS1
282,220
18. Transferred to: (Express as a negative #)
-20,664,127
Comm. lcomrn.
19. Remarks: _
I hereby certify that the foregoing is true and correct to the best of my knowledge.
R2VISIOD? ❑
Title: Production Analyst
Authorized Name and Digital Signature with Date:
DgiW. (909) by Beth Contact Phone: (713) 289-2627
Beth Farouse 3/14/2024 Beth Farouse DN: cne Beth
909 DNc2024.0Farouse(909) contact Email:bfarouselahilcorD.com
Dale: 2024.03.19 08:4123 -
Date of Revision:
Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60' F. Authority 20 AAC 25.235.
Form 10-422 Revised 10/2021
Form 10422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
HILCORP AIASKA
PRUDHOE BAY UNIT- FS-2
GAS FLARING AND VENTING INCIDENT REPORT
February 2024
Unplanned events less than or equal to 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO EUMINATE CAUSE
Not required for events <= 1 hr Not required for events <= 1 hr
TOTAL
Unplanned events greater than 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT&CAUSE ACTION TAKEN TO ELIMINATE CAUSE
See Attachments See Attachments
TOTAL 0
Planned events less than or equal to 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT&CAUSE ACTION TAKEN TO ELIMINATE CAUSE
Not required for events <= 1 hr Not required for events <= 1 hr
TOTAL 0
Planned events greater than 1 hour
DATE TIME VOLUME DESCRIPTION OF INCIDENT&CAUSE ACTION TAKEN TO ELIMINATE CAUSE
See Attachments See Attachments
TOTAL
TOTAL
Unplanned Events< 1 Hour
0
Unplanned Events> 1 Hour
0
Planned Events< I hourand not
0
exceeding 5,000 MCF
Planned Events> 1 hour or
0
exceeding 5,000 MCF
Pilot Purge
11,970
Assist
S3
TOTAL FLARED VOLUME
12,023
2. Facility NamePBU FS 2Percent100.0%19. Remarks:Title:STATE OF ALASKAALASKA OIL AND GAS CONSERVATION COMMISSIONFACILITY REPORT OF PRODUCED GAS DISPOSITION1. Facility Number 3. Field 4. Operator 5. Month/Year of Disposition0290000029 PBU - EOA HILCORP NORTH SLOPE March-2024Disposition Volume MCF20.For production from multiple pools, list contribution of each pool as a percent ofTotal Volume.6. Sold0Pool Name Pool Code7. Reinjected0PRUDHOE 6401508. Flared or vented 1 hour or less09. Flared or vented more than 1 hour (see instr.)010. Pilot and Purge12,48711. Assist Gas12MCF13. Other (see instructions)0Lease Use: MCF14. TOTAL VOLUME (ITEMS 6-13)777,730Conservation:12. Fuel gas used in lease operations.765,231AOGCC Use OnlyAuthorization >1 hr:Safety:MCF15. NGL Gas Equivalent0Waste: MCF16. Purchased gas0Reviewed by:17. Transferred from: CGF & FS1290,388COMMISSIONER18. Transferred to: (Express as a negative #)-21,919,193Comm. Comm.bfarouse@hilcorp.comForm 10-422 Revised 10/2021=I hereby certify that the foregoing is true and correct to the best of my knowledge. Revision? Date of Revision:Authorized Name and Digital Signature with Date:Contact Phone:(713) 289-2627Note:All volumes must be corrected topressure of 14.65 psia and to a temperature of60° F. Authority 20 AAC 25.235.Contact Email:Production AnalystBeth Farouse 4/15/2024Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in DuplicateDigitally signed by Beth Farouse (909)DN: cn=Beth Farouse (909)Date: 2024.04.15 15:05:26 -05'00'Beth Farouse (909)
HILCORP ALASKAPRUDHOE BAY UNIT - FS-2GAS FLARING AND VENTING INCIDENT REPORTMarch 2024Unplanned events less than or equal to 1 hourDATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSENot required for events <= 1 hr Not required for events <= 1 hrTOTAL 0Unplanned events greater than 1 hourDATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSESee Attachments See AttachmentsTOTAL0Planned events less than or equal to 1 hourDATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSENot required for events <= 1 hr Not required for events <= 1 hrTOTAL0Planned events greater than 1 hourDATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSESee Attachments See AttachmentsTOTAL0 TOTALUnplanned Events < 1 Hour 0Unplanned Events > 1 Hour 0Planned Events < 1 hour and not 0exceeding 5,000 MCFPlanned Events > 1 hour or0exceeding 5,000 MCFPilot Purge 12,487Assist 12TOTAL FLARED VOLUME 12,499
2. Facility NamePBU FS 2Percent100.0%19. Remarks:Title:Form 10-422 Revised 10/2021=I hereby certify that the foregoing is true and correct to the best of my knowledge. Revision? Date of Revision:Authorized Name and Digital Signature with Date:Contact Phone:(713) 289-2627Note:All volumes must be corrected topressure of 14.65 psia and to a temperature of60° F. Authority 20 AAC 25.235.Contact Email:Production AnalystBeth Farouse 5/15/202418. Transferred to: (Express as a negative #)-21,245,641Comm. Comm.bfarouse@hilcorp.comMCF15. NGL Gas Equivalent0Waste: MCF16. Purchased gas0Reviewed by:17. Transferred from: CGF & FS1275,038COMMISSIONERMCF13. Other (see instructions)0Lease Use: MCF14. TOTAL VOLUME (ITEMS 6-13)736,093Conservation:12. Fuel gas used in lease operations.723,510AOGCC Use OnlyAuthorization >1 hr:Safety:11. Assist Gas6010. Pilot and Purge12,5239. Flared or vented more than 1 hour (see instr.)08. Flared or vented 1 hour or less00290000029 PBU - EOA HILCORP NORTH SLOPE April-2024Disposition Volume MCF20.For production from multiple pools, list contribution of each pool as a percent ofTotal Volume.6. Sold0Pool Name Pool Code7. Reinjected0PRUDHOE 640150STATE OF ALASKAALASKA OIL AND GAS CONSERVATION COMMISSIONFACILITY REPORT OF PRODUCED GAS DISPOSITION1. Facility Number 3. Field 4. Operator 5. Month/Year of DispositionForm 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in DuplicateDigitally signed by Beth Farouse (909)DN: cn=Beth Farouse (909)Date: 2024.05.17 16:06:12 -05'00'Beth Farouse (909)
HILCORP ALASKAPRUDHOE BAY UNIT - FS-2GAS FLARING AND VENTING INCIDENT REPORTApril 2024Unplanned events less than or equal to 1 hourDATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSENot required for events <= 1 hr Not required for events <= 1 hrTOTAL 0Unplanned events greater than 1 hourDATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSESee Attachments See AttachmentsTOTAL0Planned events less than or equal to 1 hourDATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSENot required for events <= 1 hr Not required for events <= 1 hrTOTAL0Planned events greater than 1 hourDATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSESee Attachments See AttachmentsTOTAL0 TOTALUnplanned Events < 1 Hour 0Unplanned Events > 1 Hour 0Planned Events < 1 hour and not 0exceeding 5,000 MCFPlanned Events > 1 hour or0exceeding 5,000 MCFPilot Purge 12,523Assist 60TOTAL FLARED VOLUME 12,583
2. Facility NamePBU FS 2Percent100.0%19. Remarks:Title:Form 10-422 Revised 10/2021=I hereby certify that the foregoing is true and correct to the best of my knowledge. Revision? Date of Revision:Authorized Name and Digital Signature with Date:Contact Phone:(713) 289-2627Note:All volumes must be corrected topressure of 14.65 psia and to a temperature of60° F. Authority 20 AAC 25.235.Contact Email:Production AnalystBeth Farouse 6/17/202418. Transferred to: (Express as a negative #)-21,052,860Comm. Comm.bfarouse@hilcorp.comMCF15. NGL Gas Equivalent0Waste: MCF16. Purchased gas0Reviewed by:17. Transferred from: CGF & FS1266,654COMMISSIONERMCF13. Other (see instructions)0Lease Use: MCF14. TOTAL VOLUME (ITEMS 6-13)713,165Conservation:12. Fuel gas used in lease operations.692,469AOGCC Use OnlyAuthorization >1 hr:Safety:11. Assist Gas3,55710. Pilot and Purge13,7739. Flared or vented more than 1 hour (see instr.)2,2808. Flared or vented 1 hour or less1,0860290000029 PBU - EOA HILCORP NORTH SLOPE May-2024Disposition Volume MCF20.For production from multiple pools, list contribution of each pool as a percent ofTotal Volume.6. Sold0Pool Name Pool Code7. Reinjected0PRUDHOE 640150STATE OF ALASKAALASKA OIL AND GAS CONSERVATION COMMISSIONFACILITY REPORT OF PRODUCED GAS DISPOSITION1. Facility Number 3. Field 4. Operator 5. Month/Year of DispositionForm 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in DuplicateDigitally signed by Beth Farouse (909)DN: cn=Beth Farouse (909)Date: 2024.06.18 17:27:38 -05'00'Beth Farouse (909):&%JLC 12/17/2024ed by:JLC 12/17/2024
HILCORP ALASKAPRUDHOE BAY UNIT - FS-2GAS FLARING AND VENTING INCIDENT REPORTMay 2024Unplanned events less than or equal to 1 hourDATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE5/7/2024 1028:1038 60 Not required for events <= 1 hr Not required for events <= 1 hr5/7/2024 1605:1638 1985/7/2024 1835:1848 725/7/2024 1908:1924 965/7/2024 2003:2015 725/7/2024 2038:2052 845/7/2024 2325:2342 1025/7/2024 2346:2351 305/8/2024 0004:0018 84TOTAL 798Unplanned events greater than 1 hourDATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSESee Attachments See AttachmentsTOTAL0Planned events less than or equal to 1 hourDATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE5/5/2024 1245:1250 64 Not required for events <= 1 hr Not required for events <= 1 hr5/9/2024 1522:1557 1825/9/2024 1722:1730 42TOTAL288Planned events greater than 1 hourDATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE5/6/2024 0331:0615 977 See Attachments See Attachments5/8/2024 0225:0447 8525/9/2024 1122:1316 451TOTAL2,280 TOTALUnplanned Events < 1 Hour 798Unplanned Events > 1 Hour 0Planned Events < 1 hour and not 288exceeding 5,000 MCFPlanned Events > 1 hour or 2,280exceeding 5,000 MCFPilot Purge 13,773Assist 3,557TOTAL FLARED VOLUME 20,696
(('+
!"## $ !
4 4
!"<-
#" $
+
,
$$
+
,5%"
#
!"<
#" $
+
,
$$
+
,5%"
#
4$
!"(<44
;
4
<1 6,&
-./%01'23
(('+
#" $
.&)
$&+.++
%$,5%"
#
2. Facility NamePBU FS 2Percent100.0%19. Remarks:Title:Form 10-422 Revised 10/2021=I hereby certify that the foregoing is true and correct to the best of my knowledge. Revision? Date of Revision:Authorized Name and Digital Signature with Date:Contact Phone:(713) 289-2627Note:All volumes must be corrected topressure of 14.65 psia and to a temperature of60° F. Authority 20 AAC 25.235.Contact Email:Production AnalystBeth Farouse 7/16/202418. Transferred to: (Express as a negative #)-13,060,738Comm. Comm.bfarouse@hilcorp.comMCF15. NGL Gas Equivalent0Waste: MCF16. Purchased gas0Reviewed by:17. Transferred from: CGF & FS1165,966COMMISSIONERMCF13. Other (see instructions)0Lease Use: MCF14. TOTAL VOLUME (ITEMS 6-13)430,628Conservation:12. Fuel gas used in lease operations.397,006AOGCC Use OnlyAuthorization >1 hr:Safety:11. Assist Gas11,56610. Pilot and Purge12,9389. Flared or vented more than 1 hour (see instr.)6,3388. Flared or vented 1 hour or less2,7800290000029 PBU - EOA HILCORP NORTH SLOPE June-2024Disposition Volume MCF20.For production from multiple pools, list contribution of each pool as a percent ofTotal Volume.6. Sold0Pool Name Pool Code7. Reinjected0PRUDHOE 640150STATE OF ALASKAALASKA OIL AND GAS CONSERVATION COMMISSIONFACILITY REPORT OF PRODUCED GAS DISPOSITION1. Facility Number 3. Field 4. Operator 5. Month/Year of DispositionForm 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in DuplicateDigitally signed by Beth Farouse (909)DN: cn=Beth Farouse (909)Date: 2024.07.16 15:14:53 -05'00'BethFarouse(909):&%JLC 12/17/2024Wa by:
,/>KZW>^<WZh,KzhE/dͲ&^ͲϮ'^&>Z/E'EsEd/E'/E/EdZWKZd:ƵŶĞϮϬϮϰhŶƉůĂŶŶĞĚĞǀĞŶƚƐůĞƐƐƚŚĂŶŽƌĞƋƵĂůƚŽϭŚŽƵƌd d/D sK>hD ^Z/Wd/KEK&/E/EdΘh^ d/KEd<EdK>/D/Edh^ϲͬϮϵͬϮϬϮϰ ϭϱϮϱ͗ϭϱϯϬϮϰEŽƚƌĞƋƵŝƌĞĚĨŽƌĞǀĞŶƚƐфсϭŚƌEŽƚƌĞƋƵŝƌĞĚĨŽƌĞǀĞŶƚƐфсϭŚƌdKd>ϮϰhŶƉůĂŶŶĞĚĞǀĞŶƚƐŐƌĞĂƚĞƌƚŚĂŶϭŚŽƵƌd d/D sK>hD ^Z/Wd/KEK&/E/EdΘh^ d/KEd<EdK>/D/Edh^^ĞĞƚƚĂĐŚŵĞŶƚƐ^ĞĞƚƚĂĐŚŵĞŶƚƐdKd>ϬWůĂŶŶĞĚĞǀĞŶƚƐůĞƐƐƚŚĂŶŽƌĞƋƵĂůƚŽϭŚŽƵƌd d/D sK>hD ^Z/Wd/KEK&/E/EdΘh^ d/KEd<EdK>/D/Edh^ϲͬϵͬϮϬϮϰϬϳϯϬ͗ϬϴϬϬϲϰEŽƚƌĞƋƵŝƌĞĚĨŽƌĞǀĞŶƚƐфсϭŚƌEŽƚƌĞƋƵŝƌĞĚĨŽƌĞǀĞŶƚƐфсϭŚƌϲͬϵͬϮϬϮϰϭϯϰϱ͗ϭϰϰϱϯϯϮϲͬϭϭͬϮϬϮϰ ϭϰϬϬ͗ϭϰϯϬϮ͕ϭϲϲϲͬϮϵͬϮϬϮϰ ϭϱϬϬ͗ϭϱϮϬϵϳϲͬϮϵͬϮϬϮϰ ϭϳϰϬ͗ϭϴϬϬϵϳdKd>Ϯ͕ϳϱϲWůĂŶŶĞĚĞǀĞŶƚƐŐƌĞĂƚĞƌƚŚĂŶϭŚŽƵƌd d/D sK>hD ^Z/Wd/KEK&/E/EdΘh^ d/KEd<EdK>/D/Edh^ϲͬϵͬϮϬϮϰϬϰϯϬ͗ϬϳϯϬϵϯϳ ^ĞĞƚƚĂĐŚŵĞŶƚƐ^ĞĞƚƚĂĐŚŵĞŶƚƐϲͬϭϭͬϮϬϮϰ ϬϴϬϬ͗ϭϮϬϬϱ͕ϰϬϭdKd>ϲ͕ϯϯϴdKd>hŶƉůĂŶŶĞĚǀĞŶƚƐфϭ,ŽƵƌϮϰhŶƉůĂŶŶĞĚǀĞŶƚƐхϭ,ŽƵƌϬWůĂŶŶĞĚǀĞŶƚƐфϭŚŽƵƌĂŶĚŶŽƚ Ϯ͕ϳϱϲĞdžĐĞĞĚŝŶŐϱ͕ϬϬϬD&WůĂŶŶĞĚǀĞŶƚƐхϭŚŽƵƌŽƌ ϲ͕ϯϯϴĞdžĐĞĞĚŝŶŐϱ͕ϬϬϬD&WŝůŽƚWƵƌŐĞ ϭϮ͕ϵϯϴƐƐŝƐƚ ϭϭ͕ϱϲϲdKd>&>ZsK>hDϯϯ͕ϲϮϮ
%33&
!"" #
$
" $ <-
E"$ "$
#
-,0()
$!
"
,
-,0()
"
, <-
E@
#
GGGG-'.
1,
0
$!
"#'--
'HA-1
',
'.('
$)
%33&
?
$ "$@8 A(1"
2. Facility NamePBU FS 2Percent100.0%19. Remarks:Title:Form 10-422 Revised 10/2021=I hereby certify that the foregoing is true and correct to the best of my knowledge. Revision? Date of Revision:Authorized Name and Digital Signature with Date:Contact Phone:(713) 289-2627Note:All volumes must be corrected topressure of 14.65 psia and to a temperature of60° F. Authority 20 AAC 25.235.Contact Email:Production AnalystBeth Farouse 8/14/202418. Transferred to: (Express as a negative #)-20,659,903Comm. Comm.bfarouse@hilcorp.comMCF15. NGL Gas Equivalent0Waste: MCF16. Purchased gas0Reviewed by:17. Transferred from: CGF & FS1249,057COMMISSIONERMCF13. Other (see instructions)0Lease Use: MCF14. TOTAL VOLUME (ITEMS 6-13)674,085Conservation:12. Fuel gas used in lease operations.657,988AOGCC Use OnlyAuthorization >1 hr:Safety:11. Assist Gas1,48610. Pilot and Purge12,5459. Flared or vented more than 1 hour (see instr.)2,0668. Flared or vented 1 hour or less00290000029 PBU - EOA HILCORP NORTH SLOPE July-2024Disposition Volume MCF20.For production from multiple pools, list contribution of each pool as a percent ofTotal Volume.6. Sold0Pool Name Pool Code7. Reinjected0PRUDHOE 640150STATE OF ALASKAALASKA OIL AND GAS CONSERVATION COMMISSIONFACILITY REPORT OF PRODUCED GAS DISPOSITION1. Facility Number 3. Field 4. Operator 5. Month/Year of DispositionForm 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in DuplicateDigitally signed by Beth Farouse (909)DN: cn=Beth Farouse (909)Date: 2024.08.16 15:05:31 -05'00'BethFarouse(909)Beth FarousDN: cn=BeFarouseDate: 1house9)eth Farous=Besete: 1hous9)cn=rousateDNFarDseeDigitally signed by Beth Farouse (909)DN: cn=Beth Farouse (909)Date: 2024.08.19 09:21:13 -05'00'BethFarouse(909):&%*&:Jessie L. ChmielowskiDigitally signed by Jessie L. Chmielowski Date: 2025.01.15 08:54:40 -09'00'
HILCORP ALASKAPRUDHOE BAY UNIT - FS-2GAS FLARING AND VENTING INCIDENT REPORTJuly 2024Unplanned events less than or equal to 1 hourDATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSENot required for events <= 1 hr Not required for events <= 1 hrTOTAL0Unplanned events greater than 1 hourDATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE7/4/2024 1100:1900 2,066 See Attachments See AttachmentsTOTAL2,066Planned events less than or equal to 1 hourDATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSENot required for events <= 1 hr Not required for events <= 1 hrTOTAL0Planned events greater than 1 hourDATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSESee Attachments See AttachmentsTOTAL0 TOTALUnplanned Events < 1 Hour 0Unplanned Events > 1 Hour 2,066Planned Events < 1 hour and not 0exceeding 5,000 MCFPlanned Events > 1 hour or 0exceeding 5,000 MCFPilot Purge 12,545Assist 1,486TOTAL FLARED VOLUME 16,097
&*((
!"## $ !
+
!A700
;()%! <<<<9&
:-+&
,+
:+
-+9<<<<<
5+
++
&
,+$7-++-
,+&
9+9&
9+/%"
#
1+23
&4") 56 00
&*((
*
+0 7"(+.
,
2. Facility NamePBU FS 2Percent100.0%19. Remarks:Title:Form 10-422 Revised 10/2021=I hereby certify that the foregoing is true and correct to the best of my knowledge. Revision? Date of Revision:Authorized Name and Digital Signature with Date:Contact Phone:(713) 289-2627Note:All volumes must be corrected topressure of 14.65 psia and to a temperature of60° F. Authority 20 AAC 25.235.Contact Email:Production AnalystBeth Farouse 9/18/202418. Transferred to: (Express as a negative #)-20,871,176Comm. Comm.bfarouse@hilcorp.comMCF15. NGL Gas Equivalent0Waste: MCF16. Purchased gas0Reviewed by:17. Transferred from: CGF & FS1258,353COMMISSIONERMCF13. Other (see instructions)0Lease Use: MCF14. TOTAL VOLUME (ITEMS 6-13)686,777Conservation:12. Fuel gas used in lease operations.674,366AOGCC Use OnlyAuthorization >1 hr:Safety:11. Assist Gas1110. Pilot and Purge12,4009. Flared or vented more than 1 hour (see instr.)08. Flared or vented 1 hour or less00290000029 PBU - EOA HILCORP NORTH SLOPE August-2024Disposition Volume MCF20.For production from multiple pools, list contribution of each pool as a percent ofTotal Volume.6. Sold0Pool Name Pool Code7. Reinjected0PRUDHOE 640150STATE OF ALASKAALASKA OIL AND GAS CONSERVATION COMMISSIONFACILITY REPORT OF PRODUCED GAS DISPOSITION1. Facility Number 3. Field 4. Operator 5. Month/Year of DispositionForm 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in DuplicateDigitally signed by Beth Farouse (909)DN: cn=Beth Farouse (909)Date: 2024.09.19 09:56:21 -05'00'BethFarouse(909)
HILCORP ALASKAPRUDHOE BAY UNIT - FS-2GAS FLARING AND VENTING INCIDENT REPORTAugust 2024Unplanned events less than or equal to 1 hourDATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSENot required for events <= 1 hr Not required for events <= 1 hrTOTAL0Unplanned events greater than 1 hourDATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSESee Attachments See AttachmentsTOTAL0Planned events less than or equal to 1 hourDATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSENot required for events <= 1 hr Not required for events <= 1 hrTOTAL0Planned events greater than 1 hourDATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSESee Attachments See AttachmentsTOTAL0 TOTALUnplanned Events < 1 Hour 0Unplanned Events > 1 Hour 0Planned Events < 1 hour and not 0exceeding 5,000 MCFPlanned Events > 1 hour or 0exceeding 5,000 MCFPilot Purge 12,400Assist 11TOTAL FLARED VOLUME 12,411
2. Facility NamePBU FS 2Percent100.0%19. Remarks:Title:Form 10-422 Revised 10/2021=I hereby certify that the foregoing is true and correct to the best of my knowledge. Revision? Date of Revision:Authorized Name and Digital Signature with Date:Contact Phone:(713) 289-2627Note:All volumes must be corrected topressure of 14.65 psia and to a temperature of60° F. Authority 20 AAC 25.235.Contact Email:Production AnalystBeth Farouse 10/16/202418. Transferred to: (Express as a negative #)-22,031,547Comm. Comm.bfarouse@hilcorp.comMCF15. NGL Gas Equivalent0Waste: MCF16. Purchased gas0Reviewed by:17. Transferred from: CGF & FS1253,239COMMISSIONERMCF13. Other (see instructions)0Lease Use: MCF14. TOTAL VOLUME (ITEMS 6-13)701,945Conservation:12. Fuel gas used in lease operations.689,626AOGCC Use OnlyAuthorization >1 hr:Safety:11. Assist Gas010. Pilot and Purge12,2199. Flared or vented more than 1 hour (see instr.)1008. Flared or vented 1 hour or less00290000029 PBU - EOA HILCORP NORTH SLOPE September-2024Disposition Volume MCF20.For production from multiple pools, list contribution of each pool as a percent ofTotal Volume.6. Sold0Pool Name Pool Code7. Reinjected0PRUDHOE 640150STATE OF ALASKAALASKA OIL AND GAS CONSERVATION COMMISSIONFACILITY REPORT OF PRODUCED GAS DISPOSITION1. Facility Number 3. Field 4. Operator 5. Month/Year of DispositionForm 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in DuplicateDigitally signed by Beth Farouse (909)DN: cn=Beth Farouse (909)Date: 2024.10.17 10:33:56 -05'00'BethFarouse(909):&%*&:Jessie L. ChmielowskiDigitally signed by Jessie L. Chmielowski Date: 2025.01.15 08:57:35 -09'00'
HILCORP ALASKAPRUDHOE BAY UNIT - FS-2GAS FLARING AND VENTING INCIDENT REPORTSeptember 2024Unplanned events less than or equal to 1 hourDATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSENot required for events <= 1 hr Not required for events <= 1 hrTOTAL0Unplanned events greater than 1 hourDATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSESee Attachments See AttachmentsTOTAL0Planned events less than or equal to 1 hourDATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSENot required for events <= 1 hr Not required for events <= 1 hrTOTAL0Planned events greater than 1 hourDATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE9/30/2024 0310:0415 100 See Attachments See AttachmentsTOTAL100 TOTALUnplanned Events < 1 Hour 0Unplanned Events > 1 Hour 0Planned Events < 1 hour and not 0exceeding 5,000 MCFPlanned Events > 1 hour or 100exceeding 5,000 MCFPilot Purge 12,219Assist 0TOTAL FLARED VOLUME 12,319
*))
!"" #
-
!C=
%1
@4=
&'48/2'(/&*
'(0
482,1'&/
&*$!
"
456'7"8
9:
*))
<
=";(/
2. Facility NamePBU FS 2Percent100.0%19. Remarks:Title:STATE OF ALASKAALASKA OIL AND GAS CONSERVATION COMMISSIONFACILITY REPORT OF PRODUCED GAS DISPOSITION1. Facility Number 3. Field 4. Operator 5. Month/Year of Disposition0290000029 PBU - EOA HILCORP NORTH SLOPE October-2024Disposition Volume MCF20.For production from multiple pools, list contribution of each pool as a percent ofTotal Volume.6. Sold0Pool Name Pool Code7. Reinjected0PRUDHOE 6401508. Flared or vented 1 hour or less09. Flared or vented more than 1 hour (see instr.)010. Pilot and Purge12,82211. Assist Gas2,017MCF13. Other (see instructions)0Lease Use: MCF14. TOTAL VOLUME (ITEMS 6-13)718,299Conservation:12. Fuel gas used in lease operations.703,460AOGCC Use OnlyAuthorization >1 hr:Safety:MCF15. NGL Gas Equivalent0Waste: MCF16. Purchased gas0Reviewed by:17. Transferred from: CGF & FS1261,663COMMISSIONER18. Transferred to: (Express as a negative #)-22,716,726Comm. Comm.bfarouse@hilcorp.comForm 10-422 Revised 10/2021=I hereby certify that the foregoing is true and correct to the best of my knowledge. Revision? Date of Revision:Authorized Name and Digital Signature with Date:Contact Phone:(713) 289-2627Note:All volumes must be corrected topressure of 14.65 psia and to a temperature of60° F. Authority 20 AAC 25.235.Contact Email:Production AnalystBeth Farouse 11/14/2024Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in DuplicateDigitally signed by Beth Farouse (909)DN: cn=Beth Farouse (909)Date: 2024.11.18 14:14:17 -06'00'BethFarouse(909)
HILCORP ALASKAPRUDHOE BAY UNIT - FS-2GAS FLARING AND VENTING INCIDENT REPORTOctober 2024Unplanned events less than or equal to 1 hourDATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSENot required for events <= 1 hr Not required for events <= 1 hrTOTAL0Unplanned events greater than 1 hourDATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSESee Attachments See AttachmentsTOTAL0Planned events less than or equal to 1 hourDATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSENot required for events <= 1 hr Not required for events <= 1 hrTOTAL0Planned events greater than 1 hourDATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSESee Attachments See AttachmentsTOTAL0 TOTALUnplanned Events < 1 Hour 0Unplanned Events > 1 Hour 0Planned Events < 1 hour and not 0exceeding 5,000 MCFPlanned Events > 1 hour or 0exceeding 5,000 MCFPilot Purge 12,822Assist 2,017TOTAL FLARED VOLUME 14,839
2. Facility NamePBU FS 2Percent100.0%19. Remarks:Title:STATE OF ALASKAALASKA OIL AND GAS CONSERVATION COMMISSIONFACILITY REPORT OF PRODUCED GAS DISPOSITION1. Facility Number 3. Field 4. Operator 5. Month/Year of Disposition0290000029 PBU - EOA HILCORP NORTH SLOPE November-2024Disposition Volume MCF20.For production from multiple pools, list contribution of each pool as a percent ofTotal Volume.6. Sold0Pool Name Pool Code7. Reinjected0PRUDHOE 6401508. Flared or vented 1 hour or less09. Flared or vented more than 1 hour (see instr.)010. Pilot and Purge12,75311. Assist Gas0MCF13. Other (see instructions)0Lease Use: MCF14. TOTAL VOLUME (ITEMS 6-13)743,196Conservation:12. Fuel gas used in lease operations.730,443AOGCC Use OnlyAuthorization >1 hr:Safety:MCF15. NGL Gas Equivalent0Waste: MCF16. Purchased gas0Reviewed by:17. Transferred from: CGF & FS1266,522COMMISSIONER18. Transferred to: (Express as a negative #)-22,838,028Comm. Comm.bfarouse@hilcorp.comForm 10-422 Revised 10/2021=I hereby certify that the foregoing is true and correct to the best of my knowledge. Revision? Date of Revision:Authorized Name and Digital Signature with Date:Contact Phone:(713) 289-2627Note:All volumes must be corrected topressure of 14.65 psia and to a temperature of60° F. Authority 20 AAC 25.235.Contact Email:Production AnalystBeth Farouse 12/16/2023Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in DuplicateDigitally signed by Beth Farouse (909)DN: cn=Beth Farouse (909)Date: 2024.12.18 10:32:31 -06'00'BethFarouse(909)
HILCORP ALASKAPRUDHOE BAY UNIT - FS-2GAS FLARING AND VENTING INCIDENT REPORTNovember 2024Unplanned events less than or equal to 1 hourDATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSENot required for events <= 1 hr Not required for events <= 1 hrTOTAL0Unplanned events greater than 1 hourDATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSESee Attachments See AttachmentsTOTAL0Planned events less than or equal to 1 hourDATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSENot required for events <= 1 hr Not required for events <= 1 hrTOTAL0Planned events greater than 1 hourDATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSESee Attachments See AttachmentsTOTAL0 TOTALUnplanned Events < 1 Hour 0Unplanned Events > 1 Hour 0Planned Events < 1 hour and not 0exceeding 5,000 MCFPlanned Events > 1 hour or 0exceeding 5,000 MCFPilot Purge 12,753Assist 0TOTAL FLARED VOLUME 12,753
2. Facility NamePBU FS 2Percent100.0%19. Remarks:Title:Form 10-422 Revised 10/2021=I hereby certify that the foregoing is true and correct to the best of my knowledge. Revision? Date of Revision:Authorized Name and Digital Signature with Date:Contact Phone:(713) 289-2627Note:All volumes must be corrected topressure of 14.65 psia and to a temperature of60° F. Authority 20 AAC 25.235.Contact Email:Production AnalystBeth Farouse 1/17/202518. Transferred to: (Express as a negative #)-24,171,912Comm. Comm.bfarouse@hilcorp.comMCF15. NGL Gas Equivalent0Waste: MCF16. Purchased gas0Reviewed by:17. Transferred from: CGF & FS1271,562COMMISSIONERMCF13. Other (see instructions)0Lease Use: MCF14. TOTAL VOLUME (ITEMS 6-13)778,260Conservation:12. Fuel gas used in lease operations.764,766AOGCC Use OnlyAuthorization >1 hr:Safety:11. Assist Gas510. Pilot and Purge12,9899. Flared or vented more than 1 hour (see instr.)08. Flared or vented 1 hour or less5000290000029 PBU - EOA HILCORP NORTH SLOPE December-2024Disposition Volume MCF20.For production from multiple pools, list contribution of each pool as a percent ofTotal Volume.6. Sold0Pool Name Pool Code7. Reinjected0PRUDHOE 640150STATE OF ALASKAALASKA OIL AND GAS CONSERVATION COMMISSIONFACILITY REPORT OF PRODUCED GAS DISPOSITION1. Facility Number 3. Field 4. Operator 5. Month/Year of DispositionForm 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in DuplicateDigitally signed by Beth Farouse (909)DN: cn=Beth Farouse (909)Date: 2025.01.19 17:35:27 -09'00'Beth Farouse (909)
HILCORP ALASKAPRUDHOE BAY UNIT - FS-2GAS FLARING AND VENTING INCIDENT REPORTDecember 2024Unplanned events less than or equal to 1 hourDATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSE12/3/2024 1946:2006 500 Not required for events <= 1 hr Not required for events <= 1 hrTOTAL500Unplanned events greater than 1 hourDATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSESee Attachments See AttachmentsTOTAL0Planned events less than or equal to 1 hourDATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSENot required for events <= 1 hr Not required for events <= 1 hrTOTAL0Planned events greater than 1 hourDATE TIME VOLUME DESCRIPTION OF INCIDENT & CAUSE ACTION TAKEN TO ELIMINATE CAUSESee Attachments See AttachmentsTOTAL0 TOTALUnplanned Events < 1 Hour 500Unplanned Events > 1 Hour 0Planned Events < 1 hour and not 0exceeding 5,000 MCFPlanned Events > 1 hour or 0exceeding 5,000 MCFPilot Purge 12,989Assist 5TOTAL FLARED VOLUME 13,494