Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAboutPBU Lisburne (GPMA) - Hilcorp North Slope, LLC2. Facility Name
PBU LISBURNE PROD (GPMA)
Percent
57.3%
0.3%
0.0%
0.3%
13.1%
0.0%
0.0%
0.4%
28.6%
19. Remarks:
Pt McIntyre NGLs at CGF gas equivalent = 27,437; Pt McIntyre LPC Rich Gas NGLs at CGF gas equivalent = 3,953 and
Lisburne LPC Rich Gas NGLs at CGF gas equivalent = 8,115;
Block 18: LPC Rich Gas to CGF = 1,658,519
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number 3. Field 4. Operator 5. Month/Year of Disposition
0290000009 PBU - GPMA Hilcorp January-2024
Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold 159,530 Pool Name Pool Code
7. Reinjected 8,565,984 Prudhoe Bay, Lisburne Oil 640144
Prudhoe Bay, Niakuk Oil 640148
8. Flared or vented 1 hour or less 26 Prudhoe Bay, W Bch Tr Un 640187
Prudhoe Bay, Sag Riv Undef 640165
9. Flared or vented more than 1 hour (see instr.)0 Prudhoe Bay, Prudhoe Oil 640150
Prudhoe Bay, W Beach Oil 640186
10. Pilot and Purge 13,205 Prudhoe Bay, N Prudhoe Bay 640152
Prudhoe Bay, Raven Oil 640147
Prudhoe Bay, Pt Mcintyre Oil 640180
12. Fuel gas used in lease operations.914,334 AOGCC Use Only
13. Other (see instructions)3,783,419
MCF
Safety:
Lease Use:
14. TOTAL VOLUME (ITEMS 6-13)13,552,287
11. Assist Gas 115,789
MCFAuthorization >1 hr:
Conservation:MCF
15. NGL Gas Equivalent 159,530
MCF
16. Purchased gas 0
Waste:
Contact Phone:Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60° F. Authority 20 AAC 25.235.Contact Email:Richard.Everett@hilcorp.com
Form 10-422 Revised 10/2021
Reviewed by:
COMMISSIONER
Title: Senior Accounting Advisor
713-757-7133
Comm.Comm.
Block 13: Lift Gas Off Field; Block 17: MI from Prudhoe = 2,642,064 and Fuel Gas from Prudhoe = 0
17. Transferred from:2,642,064
18. Transferred to: (Express as a negative #)-1,658,519
I hereby certify that the foregoing is true and correct to the best of my knowledge. Revision? Date of Revision:
Authorized Name and Digital Signature with Date:
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
Hilcorp Energy Company ALASKA
CONSERVATION ORDER NO. 219
PRUDHOE BAY, PRUDHOE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Jan-24
VOLUME PLANNED
DATE TIME (Mscf)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
1/2/2024 15:00-15:01 2 U
1/16/2024 5:32-5:34 2 U
Total Flare <= 1 Hour 4
Total Flare > 1 Hour 0
Volume Flared 4
Measured Safety Pilot 1,730
Continuous Assist 15,198
TOTAL FLARED 16,932
Hilcorp Energy Company ALASKA
CONSERVATION ORDER NO. 219
PRUDHOE BAY, LISBURNE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Jan-24
VOLUME PLANNED
DATE TIME (MSCF)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
1/2/2024 15:00-15:01 7 U
1/16/2024 5:32-5:34 8 U
Total Flare <= 1 Hour 15
Total Flare > 1 Hour 0
Volume Flared 15
Measured Safety Pilot 7,568
Continuous Assist 66,278
TOTAL FLARED 73,861
Hilcorp Energy Company ALASKA
CONSERVATION ORDER NO. 219
PRUDHOE BAY, POINT MCINTYRE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Jan-24
VOLUME PLANNED
DATE TIME (MSCF)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
1/2/2024 15:00-15:01 4 U
1/16/2024 5:32-5:34 3 U
Total Flare <= 1 Hour 7
Total Flare > 1 Hour 0
Volume Flared 7
Measured Safety Pilot 3,776
Continuous Assist 33,162
TOTAL FLARED 36,945
Hilcorp Energy Company ALASKA
CONSERVATION ORDER NO. 219
PRUDHOE BAY, WEST BEACH
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Jan-24
VOLUME PLANNED
DATE TIME (MSCF)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
1/2/2024 15:00-15:01 0 U
1/16/2024 5:32-5:34 0 U
Total Flare <= 1 Hour 0
Total Flare > 1 Hour 0
Volume Flared 0
Measured Safety Pilot 0
Continuous Assist 0
TOTAL FLARED 0
Hilcorp Energy Company ALASKA
CONSERVATION ORDER NO. 219
PRUDHOE BAY, NORTH PRUDHOE BAY
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Jan-24
VOLUME PLANNED
DATE TIME (MSCF)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
1/2/2024 15:00-15:01 0 U
1/16/2024 5:32-5:34 0 U
Total Flare <= 1 Hour 0
Total Flare > 1 Hour 0
Volume Flared 0
Measured Safety Pilot 0
Continuous Assist 0
TOTAL FLARED 0
Hilcorp Energy Company ALASKA
CONSERVATION ORDER NO. 219
PRUDHOE BAY, COMBINED NIAKUK
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Jan-24
VOLUME PLANNED
DATE TIME (Mscf)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
1/2/2024 15:00-15:01 0 U
1/16/2024 5:32-5:34 0 U
Total Flare <= 1 Hour 0
Total Flare > 1 Hour 0
Volume Flared 0
Measured Safety Pilot 37
Continuous Assist 327
TOTAL FLARED 364
Hilcorp Energy Company ALASKA
CONSERVATION ORDER NO. 219
PRUDHOE BAY, RAVEN
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Jan-24
VOLUME PLANNED
DATE TIME (Mscf)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
1/2/2024 15:00-15:01 0 U
1/16/2024 5:32-5:34 0 U
Total Flare <= 1 Hour 0
Total Flare > 1 Hour 0
Volume Flared 0
Measured Safety Pilot 94
Continuous Assist 824
TOTAL FLARED 918
2. Facility Name
PBU LISBURNE PROD (GPMA)
Percent
62.0%
0.2%
0.0%
0.1%
12.3%
0.0%
0.0%
0.5%
24.9%
19. Remarks:
Pt McIntyre NGLs at CGF gas equivalent = 26,085; Pt McIntyre LPC Rich Gas NGLs at CGF gas equivalent = 3,822 and
Lisburne LPC Rich Gas NGLs at CGF gas equivalent = 9,549;
Block 18: LPC Rich Gas to CGF = 1,724,709
Form 10-422 Revised 10/2021
Reviewed by:
COMMISSIONER
Title: Senior Accounting Advisor
713-757-7133
Comm.Comm.
Block 13: Lift Gas Off Field; Block 17: MI from Prudhoe = 2,525,813 and Fuel Gas from Prudhoe = 0
17. Transferred from:2,525,813
18. Transferred to: (Express as a negative #)-1,724,709
I hereby certify that the foregoing is true and correct to the best of my knowledge. Revision? Date of Revision:
Authorized Name and Digital Signature with Date:
Contact Phone:Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60° F. Authority 20 AAC 25.235.Contact Email:Richard.Everett@hilcorp.com
MCFAuthorization >1 hr:
Conservation:MCF
15. NGL Gas Equivalent 151,686
MCF
16. Purchased gas 0
Waste:
Prudhoe Bay, Pt Mcintyre Oil 640180
12. Fuel gas used in lease operations.852,618 AOGCC Use Only
13. Other (see instructions)3,384,389
MCF
Safety:
Lease Use:
14. TOTAL VOLUME (ITEMS 6-13)12,411,418
11. Assist Gas 107,293
10. Pilot and Purge 12,352 Prudhoe Bay, N Prudhoe Bay 640152
Prudhoe Bay, Raven Oil 640147
9. Flared or vented more than 1 hour (see instr.)0 Prudhoe Bay, Prudhoe Oil 640150
Prudhoe Bay, W Beach Oil 640186
Prudhoe Bay, Niakuk Oil 640148
8. Flared or vented 1 hour or less 0 Prudhoe Bay, W Bch Tr Un 640187
Prudhoe Bay, Sag Riv Undef 640165
0290000009 PBU - GPMA Hilcorp February-2024
Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold 151,686 Pool Name Pool Code
7. Reinjected 7,903,080 Prudhoe Bay, Lisburne Oil 640144
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number 3. Field 4. Operator 5. Month/Year of Disposition
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
Hilcorp Energy Company ALASKA
CONSERVATION ORDER NO. 219
PRUDHOE BAY, PRUDHOE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Feb-24
VOLUME PLANNED
DATE TIME (Mscf)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare <= 1 Hour 0
Total Flare > 1 Hour 0
Volume Flared 0
Measured Safety Pilot 1,523
Continuous Assist 13,227
TOTAL FLARED 14,750
Hilcorp Energy Company ALASKA
CONSERVATION ORDER NO. 219
PRUDHOE BAY, LISBURNE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Feb-24
VOLUME PLANNED
DATE TIME (MSCF)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare <= 1 Hour 0
Total Flare > 1 Hour 0
Volume Flared 0
Measured Safety Pilot 7,646
Continuous Assist 66,404
TOTAL FLARED 74,050
Hilcorp Energy Company ALASKA
CONSERVATION ORDER NO. 219
PRUDHOE BAY, POINT MCINTYRE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Feb-24
VOLUME PLANNED
DATE TIME (MSCF)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare <= 1 Hour 0
Total Flare > 1 Hour 0
Volume Flared 0
Measured Safety Pilot 3,077
Continuous Assist 26,759
TOTAL FLARED 29,836
Hilcorp Energy Company ALASKA
CONSERVATION ORDER NO. 219
PRUDHOE BAY, WEST BEACH
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Feb-24
VOLUME PLANNED
DATE TIME (MSCF)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare <= 1 Hour 0
Total Flare > 1 Hour 0
Volume Flared 0
Measured Safety Pilot 0
Continuous Assist 0
TOTAL FLARED 0
Hilcorp Energy Company ALASKA
CONSERVATION ORDER NO. 219
PRUDHOE BAY, NORTH PRUDHOE BAY
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Feb-24
VOLUME PLANNED
DATE TIME (MSCF)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare <= 1 Hour 0
Total Flare > 1 Hour 0
Volume Flared 0
Measured Safety Pilot 0
Continuous Assist 0
TOTAL FLARED 0
Hilcorp Energy Company ALASKA
CONSERVATION ORDER NO. 219
PRUDHOE BAY, COMBINED NIAKUK
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Feb-24
VOLUME PLANNED
DATE TIME (Mscf)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare <= 1 Hour 0
Total Flare > 1 Hour 0
Volume Flared 0
Measured Safety Pilot 28
Continuous Assist 243
TOTAL FLARED 271
Hilcorp Energy Company ALASKA
CONSERVATION ORDER NO. 219
PRUDHOE BAY, RAVEN
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Feb-24
VOLUME PLANNED
DATE TIME (Mscf)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare <= 1 Hour 0
Total Flare > 1 Hour 0
Volume Flared 0
Measured Safety Pilot 78
Continuous Assist 660
TOTAL FLARED 738
2. Facility Name
PBU LISBURNE PROD (GPMA)
Percent
58.3%
0.1%
0.0%
0.3%
12.2%
0.0%
0.0%
0.0%
0.0%
19. Remarks:
Pt McIntyre NGLs at CGF gas equivalent = 28,709; Pt McIntyre LPC Rich Gas NGLs at CGF gas equivalent = 4,403 and
Lisburne LPC Rich Gas NGLs at CGF gas equivalent = 8,952;
Block 18: LPC Rich Gas to CGF = 1,810,948
Form 10-422 Revised 10/2021
Reviewed by:
COMMISSIONER
Title: Senior Accounting Advisor
713-757-7133
Comm.Comm.
Block 13: Lift Gas Off Field; Block 17: MI from Prudhoe = 2,308,065 and Fuel Gas from Prudhoe = 0
17. Transferred from:2,308,065
18. Transferred to: (Express as a negative #)-1,810,948
I hereby certify that the foregoing is true and correct to the best of my knowledge. Revision? Date of Revision:
Authorized Name and Digital Signature with Date:
Contact Phone:Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60° F. Authority 20 AAC 25.235.Contact Email:Richard.Everett@hilcorp.com
MCFAuthorization >1 hr:
Conservation:MCF
15. NGL Gas Equivalent 158,334
MCF
16. Purchased gas 0
Waste:
Prudhoe Bay, Raven Oil 640147
12. Fuel gas used in lease operations.910,886 AOGCC Use Only
13. Other (see instructions)3,798,712
MCF
Safety:
Lease Use:
14. TOTAL VOLUME (ITEMS 6-13)13,106,260
11. Assist Gas 109,504
10. Pilot and Purge 12,811 Prudhoe Bay, N Prudhoe Bay 640152
BROOKIAN UND OIL 640132
9. Flared or vented more than 1 hour (see instr.)0 Prudhoe Bay, Prudhoe Oil 640150
Prudhoe Bay, W Beach Oil 640186
Prudhoe Bay, Niakuk Oil 640148
8. Flared or vented 1 hour or less 0 Prudhoe Bay, W Bch Tr Un 640187
Prudhoe Bay, Sag Riv Undef 640165
0290000009 PBU - GPMA Hilcorp March-2024
Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold 158,334 Pool Name Pool Code
7. Reinjected 8,116,013 Prudhoe Bay, Lisburne Oil 640144
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number 3. Field 4. Operator 5. Month/Year of Disposition
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
Hilcorp Energy Company ALASKA
CONSERVATION ORDER NO. 219
PRUDHOE BAY, PRUDHOE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Mar-24
VOLUME PLANNED
DATE TIME (Mscf)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare <= 1 Hour 0
Total Flare > 1 Hour 0
Volume Flared 0
Measured Safety Pilot 1,569
Continuous Assist 13,406
TOTAL FLARED 14,975
Hilcorp Energy Company ALASKA
CONSERVATION ORDER NO. 219
PRUDHOE BAY, LISBURNE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Mar-24
VOLUME PLANNED
DATE TIME (MSCF)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare <= 1 Hour 0
Total Flare > 1 Hour 0
Volume Flared 0
Measured Safety Pilot 7,466
Continuous Assist 63,691
TOTAL FLARED 71,157
Hilcorp Energy Company ALASKA
CONSERVATION ORDER NO. 219
PRUDHOE BAY, POINT MCINTYRE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Mar-24
VOLUME PLANNED
DATE TIME (MSCF)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare <= 1 Hour 0
Total Flare > 1 Hour 0
Volume Flared 0
Measured Safety Pilot 3,718
Continuous Assist 31,914
TOTAL FLARED 35,632
Hilcorp Energy Company ALASKA
CONSERVATION ORDER NO. 219
PRUDHOE BAY, WEST BEACH
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Mar-24
VOLUME PLANNED
DATE TIME (MSCF)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare <= 1 Hour 0
Total Flare > 1 Hour 0
Volume Flared 0
Measured Safety Pilot 0
Continuous Assist 0
TOTAL FLARED 0
Hilcorp Energy Company ALASKA
CONSERVATION ORDER NO. 219
PRUDHOE BAY, NORTH PRUDHOE BAY
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Mar-24
VOLUME PLANNED
DATE TIME (MSCF)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare <= 1 Hour 0
Total Flare > 1 Hour 0
Volume Flared 0
Measured Safety Pilot 0
Continuous Assist 0
TOTAL FLARED 0
Hilcorp Energy Company ALASKA
CONSERVATION ORDER NO. 219
PRUDHOE BAY, COMBINED NIAKUK
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Mar-24
VOLUME PLANNED
DATE TIME (Mscf)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare <= 1 Hour 0
Total Flare > 1 Hour 0
Volume Flared 0
Measured Safety Pilot 13
Continuous Assist 109
TOTAL FLARED 122
Hilcorp Energy Company ALASKA
CONSERVATION ORDER NO. 219
PRUDHOE BAY, RAVEN
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Mar-24
VOLUME PLANNED
DATE TIME (Mscf)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
Total Flare <= 1 Hour 0
Total Flare > 1 Hour 0
Volume Flared 0
Measured Safety Pilot 45
Continuous Assist 384
TOTAL FLARED 429
2. Facility Name
PBU LISBURNE PROD (GPMA)
Percent
56.4%
0.1%
0.0%
0.4%
12.4%
0.0%
0.0%
0.0%
0.0%
19. Remarks:
Pt McIntyre NGLs at CGF gas equivalent = 28,277; Pt McIntyre LPC Rich Gas NGLs at CGF gas equivalent = 2,928 and
Lisburne LPC Rich Gas NGLs at CGF gas equivalent = 5,435;
Block 18: LPC Rich Gas to CGF = 1,251,928
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number 3. Field 4. Operator 5. Month/Year of Disposition
0290000009 PBU - GPMA Hilcorp April-2024
Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold 140,019 Pool Name Pool Code
7. Reinjected 8,025,010 Prudhoe Bay, Lisburne Oil 640144
Prudhoe Bay, Niakuk Oil 640148
8. Flared or vented 1 hour or less 16 Prudhoe Bay, W Bch Tr Un 640187
Prudhoe Bay, Sag Riv Undef 640165
9. Flared or vented more than 1 hour (see instr.)0 Prudhoe Bay, Prudhoe Oil 640150
Prudhoe Bay, W Beach Oil 640186
10. Pilot and Purge 12,036 Prudhoe Bay, N Prudhoe Bay 640152
BROOKIAN UND OIL 640132
Prudhoe Bay, Raven Oil 640147
12. Fuel gas used in lease operations.835,050 AOGCC Use Only
13. Other (see instructions)3,449,871
MCF
Safety:
Lease Use:
14. TOTAL VOLUME (ITEMS 6-13)12,582,259
11. Assist Gas 120,257
MCFAuthorization >1 hr:
Conservation:MCF
15. NGL Gas Equivalent 140,019
MCF
16. Purchased gas 0
Waste:
Contact Phone:Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60° F. Authority 20 AAC 25.235.Contact Email:Richard.Everett@hilcorp.com
Form 10-422 Revised 10/2021
Reviewed by:
COMMISSIONER
Title: Senior Accounting Advisor
713-757-7133
Comm.Comm.
Block 13: Lift Gas Off Field; Block 17: MI from Prudhoe = 2,155,294 and Fuel Gas from Prudhoe = 0
17. Transferred from:2,155,294
18. Transferred to: (Express as a negative #)-1,251,928
I hereby certify that the foregoing is true and correct to the best of my knowledge. Revision? Date of Revision:
Authorized Name and Digital Signature with Date:
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
Hilcorp Energy Company ALASKA
CONSERVATION ORDER NO. 219
PRUDHOE BAY, PRUDHOE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Apr-24
VOLUME PLANNED
DATE TIME (Mscf)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
4/2/2024 16:43-16:44 1 U
4/23/2024 8:29-8:30 1 U
Total Flare <= 1 Hour 2
Total Flare > 1 Hour 0
Volume Flared 2
Measured Safety Pilot 1,490
Continuous Assist 14,843
TOTAL FLARED 16,335
Hilcorp Energy Company ALASKA
CONSERVATION ORDER NO. 219
PRUDHOE BAY, LISBURNE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Apr-24
VOLUME PLANNED
DATE TIME (MSCF)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
4/2/2024 16:43-16:44 6 U
4/23/2024 8:29-8:30 2 U
Total Flare <= 1 Hour 8
Total Flare > 1 Hour 0
Volume Flared 8
Measured Safety Pilot 6,782
Continuous Assist 67,884
TOTAL FLARED 74,674
Hilcorp Energy Company ALASKA
CONSERVATION ORDER NO. 219
PRUDHOE BAY, POINT MCINTYRE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Apr-24
VOLUME PLANNED
DATE TIME (MSCF)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
4/2/2024 16:43-16:44 5 U
4/23/2024 8:29-8:30 1 U
Total Flare <= 1 Hour 6
Total Flare > 1 Hour 0
Volume Flared 6
Measured Safety Pilot 3,708
Continuous Assist 36,978
TOTAL FLARED 40,692
Hilcorp Energy Company ALASKA
CONSERVATION ORDER NO. 219
PRUDHOE BAY, WEST BEACH
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Apr-24
VOLUME PLANNED
DATE TIME (MSCF)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
4/2/2024 16:43-16:44 0 U
4/23/2024 8:29-8:30 0 U
Total Flare <= 1 Hour 0
Total Flare > 1 Hour 0
Volume Flared 0
Measured Safety Pilot 0
Continuous Assist 0
TOTAL FLARED 0
Hilcorp Energy Company ALASKA
CONSERVATION ORDER NO. 219
PRUDHOE BAY, NORTH PRUDHOE BAY
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Apr-24
VOLUME PLANNED
DATE TIME (MSCF)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
4/2/2024 16:43-16:44 0 U
4/23/2024 8:29-8:30 0 U
Total Flare <= 1 Hour 0
Total Flare > 1 Hour 0
Volume Flared 0
Measured Safety Pilot 0
Continuous Assist 0
TOTAL FLARED 0
Hilcorp Energy Company ALASKA
CONSERVATION ORDER NO. 219
PRUDHOE BAY, COMBINED NIAKUK
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Apr-24
VOLUME PLANNED
DATE TIME (Mscf)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
4/2/2024 16:43-16:44 0 U
4/23/2024 8:29-8:30 0 U
Total Flare <= 1 Hour 0
Total Flare > 1 Hour 0
Volume Flared 0
Measured Safety Pilot 9
Continuous Assist 91
TOTAL FLARED 100
Hilcorp Energy Company ALASKA
CONSERVATION ORDER NO. 219
PRUDHOE BAY, RAVEN
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Apr-24
VOLUME PLANNED
DATE TIME (Mscf)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
4/2/2024 16:43-16:44 0 U
4/23/2024 8:29-8:30 0 U
Total Flare <= 1 Hour 0
Total Flare > 1 Hour 0
Volume Flared 0
Measured Safety Pilot 47
Continuous Assist 461
TOTAL FLARED 508
2. Facility Name
PBU LISBURNE PROD (GPMA)
Percent
59.1%
0.2%
0.0%
0.4%
9.9%
0.0%
0.3%
0.0%
0.0%
0.1%
30.1%
19. Remarks:
Pt McIntyre NGLs at CGF gas equivalent = 28,648; Pt McIntyre LPC Rich Gas NGLs at CGF gas equivalent = 2,497 and
Lisburne LPC Rich Gas NGLs at CGF gas equivalent = 5,541;
Block 18: LPC Rich Gas to CGF = 1,252,300
Prudhoe Bay, Raven Oil 640147
Prudhoe Bay, Pt Mcintyre Oil 640180
11. Assist Gas 130,429
Form 10-422 Revised 10/2021
Reviewed by:
COMMISSIONER
Title: Senior Accounting Advisor
713-757-7133
Comm.Comm.
Block 13: Lift Gas Off Field; Block 17: MI from Prudhoe = 1,819,826 and Fuel Gas from Prudhoe = 0
17. Transferred from:1,819,826
18. Transferred to: (Express as a negative #)-1,252,300
I hereby certify that the foregoing is true and correct to the best of my knowledge. Revision? Date of Revision:
Authorized Name and Digital Signature with Date:
Contact Phone:Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60° F. Authority 20 AAC 25.235.Contact Email:Richard.Everett@hilcorp.com
MCFAuthorization >1 hr:
Conservation:MCF
15. NGL Gas Equivalent 136,589
MCF
16. Purchased gas 0
Waste:
BROOKIAN UND OIL 640132
12. Fuel gas used in lease operations.791,889 AOGCC Use Only
13. Other (see instructions)3,891,053
MCF
Safety:
Lease Use:
14. TOTAL VOLUME (ITEMS 6-13)12,180,656
10. Pilot and Purge 12,384 Prudhoe Bay, Pt M Stump Is Oil 640183
Prudhoe Bay, N Prudhoe Bay Oil 640152
9. Flared or vented more than 1 hour (see instr.)0 Prudhoe Bay, Prudhoe Oil 640150
Prudhoe Bay, W Beach Oil 640186
Prudhoe Bay, Niakuk Oil 640148
8. Flared or vented 1 hour or less 513 Prudhoe Bay, W Bch Tr Un WTRSP 640187
Prudhoe Bay, Sag Riv Undef Oil 640165
0290000009 PBU - GPMA Hilcorp May-2024
Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold 136,589 Pool Name Pool Code
7. Reinjected 7,217,799 Prudhoe Bay, Lisburne Oil 640144
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number 3. Field 4. Operator 5. Month/Year of Disposition
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
Hilcorp Energy Company ALASKA
CONSERVATION ORDER NO. 219
PRUDHOE BAY, PRUDHOE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
May-24
VOLUME PLANNED
DATE TIME (Mscf)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
5/4/2024 6:39-7:37 36 P
5/4/2024 19:43-19:47 38 P
5/5/2024 5:27-5:28 0 P
Total Flare <= 1 Hour 74
Total Flare > 1 Hour 0
Volume Flared 74
Measured Safety Pilot 1,192
Continuous Assist 12,928
TOTAL FLARED 14,194
Hilcorp Energy Company ALASKA
CONSERVATION ORDER NO. 219
PRUDHOE BAY, LISBURNE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
May-24
VOLUME PLANNED
DATE TIME (MSCF)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
5/4/2024 6:39-7:37 149 P
5/4/2024 19:43-19:47 153 P
5/5/2024 5:27-5:28 5 P
Total Flare <= 1 Hour 307
Total Flare > 1 Hour 0
Volume Flared 307
Measured Safety Pilot 7,232
Continuous Assist 76,721
TOTAL FLARED 84,260
Hilcorp Energy Company ALASKA
CONSERVATION ORDER NO. 219
PRUDHOE BAY, POINT MCINTYRE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
May-24
VOLUME PLANNED
DATE TIME (MSCF)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
5/4/2024 6:39-7:37 60 P
5/4/2024 19:43-19:47 61 P
5/5/2024 5:27-5:28 11 P
Total Flare <= 1 Hour 132
Total Flare > 1 Hour 0
Volume Flared 132
Measured Safety Pilot 3,892
Continuous Assist 40,065
TOTAL FLARED 44,089
Hilcorp Energy Company ALASKA
CONSERVATION ORDER NO. 219
PRUDHOE BAY, WEST BEACH
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
May-24
VOLUME PLANNED
DATE TIME (MSCF)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
5/4/2024 6:39-7:37 0 P
5/4/2024 19:43-19:47 0 P
5/5/2024 5:27-5:28 0 P
Total Flare <= 1 Hour 0
Total Flare > 1 Hour 0
Volume Flared 0
Measured Safety Pilot 0
Continuous Assist 0
TOTAL FLARED 0
Hilcorp Energy Company ALASKA
CONSERVATION ORDER NO. 219
PRUDHOE BAY, NORTH PRUDHOE BAY
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
May-24
VOLUME PLANNED
DATE TIME (MSCF)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
5/4/2024 6:39-7:37 0 P
5/4/2024 19:43-19:47 0 P
5/5/2024 5:27-5:28 0 P
Total Flare <= 1 Hour 0
Total Flare > 1 Hour 0
Volume Flared 0
Measured Safety Pilot 0
Continuous Assist 0
TOTAL FLARED 0
Hilcorp Energy Company ALASKA
CONSERVATION ORDER NO. 219
PRUDHOE BAY, COMBINED NIAKUK
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
May-24
VOLUME PLANNED
DATE TIME (Mscf)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
5/4/2024 6:39-7:37 0 P
5/4/2024 19:43-19:47 0 P
5/5/2024 5:27-5:28 0 P
Total Flare <= 1 Hour 0
Total Flare > 1 Hour 0
Volume Flared 0
Measured Safety Pilot 17
Continuous Assist 185
TOTAL FLARED 202
Hilcorp Energy Company ALASKA
CONSERVATION ORDER NO. 219
PRUDHOE BAY, RAVEN
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
May-24
VOLUME PLANNED
DATE TIME (Mscf)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
5/4/2024 6:39-7:37 0 P
5/4/2024 19:43-19:47 0 P
5/5/2024 5:27-5:28 0 P
Total Flare <= 1 Hour 0
Total Flare > 1 Hour 0
Volume Flared 0
Measured Safety Pilot 51
Continuous Assist 530
TOTAL FLARED 581
2. Facility Name
PBU LISBURNE PROD (GPMA)
Percent
52.0%
0.2%
0.0%
0.4%
11.8%
0.0%
0.2%
0.0%
0.0%
19. Remarks:
Pt McIntyre NGLs at CGF gas equivalent = 26,142; Pt McIntyre LPC Rich Gas NGLs at CGF gas equivalent = 3,923 and
Lisburne LPC Rich Gas NGLs at CGF gas equivalent = 5,785;
Block 18: LPC Rich Gas to CGF = 1,486,436
Form 10-422 Revised 10/2021
Reviewed by:
COMMISSIONER
Title: Senior Accounting Advisor
713-757-7133
Comm.Comm.
Block 13: Lift Gas Off Field; Block 17: MI from Prudhoe = 1,809,427 and Fuel Gas from Prudhoe = 0
17. Transferred from:1,809,427
18. Transferred to: (Express as a negative #)-1,486,436
I hereby certify that the foregoing is true and correct to the best of my knowledge. Revision? Date of Revision:
Authorized Name and Digital Signature with Date:
Contact Phone:Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60° F. Authority 20 AAC 25.235.Contact Email:Richard.Everett@hilcorp.com
MCFAuthorization >1 hr:
Conservation:MCF
15. NGL Gas Equivalent 139,550
MCF
16. Purchased gas 0
Waste:
BROOKIAN UND OIL 640132
12. Fuel gas used in lease operations.780,191 AOGCC Use Only
13. Other (see instructions)3,573,693
MCF
Safety:
Lease Use:
14. TOTAL VOLUME (ITEMS 6-13)11,657,012
11. Assist Gas 136,009
10. Pilot and Purge 11,959 Prudhoe Bay, Pt M Stump Is 640183
Prudhoe Bay, N Prudhoe Bay 640152
9. Flared or vented more than 1 hour (see instr.)0 Prudhoe Bay, Prudhoe Oil 640150
Prudhoe Bay, W Beach Oil 640186
Prudhoe Bay, Niakuk Oil 640148
8. Flared or vented 1 hour or less 2 Prudhoe Bay, W Bch Tr Un 640187
Prudhoe Bay, Sag Riv Undef 640165
0290000009 PBU - GPMA Hilcorp June-2024
Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold 139,550 Pool Name Pool Code
7. Reinjected 7,015,608 Prudhoe Bay, Lisburne Oil 640144
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number 3. Field 4. Operator 5. Month/Year of Disposition
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
Hilcorp Energy Company ALASKA
CONSERVATION ORDER NO. 219
PRUDHOE BAY, PRUDHOE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Jun-24
VOLUME PLANNED
DATE TIME (Mscf)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
6/24/2024 10:10-10:25 0 U
6/24/2024 13:15-13:17 0 U
Total Flare <= 1 Hour 0
Total Flare > 1 Hour 0
Volume Flared 0
Measured Safety Pilot 1,421
Continuous Assist 16,059
TOTAL FLARED 17,480
Hilcorp Energy Company ALASKA
CONSERVATION ORDER NO. 219
PRUDHOE BAY, LISBURNE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Jun-24
VOLUME PLANNED
DATE TIME (MSCF)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
6/24/2024 10:10-10:25 0 U
6/24/2024 13:15-13:17 0 U
Total Flare <= 1 Hour 0
Total Flare > 1 Hour 0
Volume Flared 0
Measured Safety Pilot 6,206
Continuous Assist 70,780
TOTAL FLARED 76,986
Hilcorp Energy Company ALASKA
CONSERVATION ORDER NO. 219
PRUDHOE BAY, POINT MCINTYRE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Jun-24
VOLUME PLANNED
DATE TIME (MSCF)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
6/24/2024 10:10-10:25 0 U
6/24/2024 13:15-13:17 0 U
Total Flare <= 1 Hour 0
Total Flare > 1 Hour 0
Volume Flared 0
Measured Safety Pilot 4,256
Continuous Assist 48,298
TOTAL FLARED 52,554
Hilcorp Energy Company ALASKA
CONSERVATION ORDER NO. 219
PRUDHOE BAY, WEST BEACH
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Jun-24
VOLUME PLANNED
DATE TIME (MSCF)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
6/24/2024 10:10-10:25 0 U
6/24/2024 13:15-13:17 0 U
Total Flare <= 1 Hour 0
Total Flare > 1 Hour 0
Volume Flared 0
Measured Safety Pilot 0
Continuous Assist 0
TOTAL FLARED 0
Hilcorp Energy Company ALASKA
CONSERVATION ORDER NO. 219
PRUDHOE BAY, NORTH PRUDHOE BAY
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Jun-24
VOLUME PLANNED
DATE TIME (MSCF)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
6/24/2024 10:10-10:25 0 U
6/24/2024 13:15-13:17 0 U
Total Flare <= 1 Hour 0
Total Flare > 1 Hour 0
Volume Flared 0
Measured Safety Pilot 0
Continuous Assist 0
TOTAL FLARED 0
Hilcorp Energy Company ALASKA
CONSERVATION ORDER NO. 219
PRUDHOE BAY, COMBINED NIAKUK
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Jun-24
VOLUME PLANNED
DATE TIME (Mscf)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
6/24/2024 10:10-10:25 0 U
6/24/2024 13:15-13:17 0 U
Total Flare <= 1 Hour 0
Total Flare > 1 Hour 0
Volume Flared 0
Measured Safety Pilot 27
Continuous Assist 312
TOTAL FLARED 339
Hilcorp Energy Company ALASKA
CONSERVATION ORDER NO. 219
PRUDHOE BAY, RAVEN
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Jun-24
VOLUME PLANNED
DATE TIME (Mscf)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
6/24/2024 10:10-10:25 0 U
6/24/2024 13:15-13:17 0 U
Total Flare <= 1 Hour 0
Total Flare > 1 Hour 0
Volume Flared 0
Measured Safety Pilot 49
Continuous Assist 560
TOTAL FLARED 609
2. Facility Name
PBU LISBURNE PROD (GPMA)
Percent
53.4%
0.3%
0.0%
0.4%
12.2%
0.0%
0.8%
0.0%
0.0%
19. Remarks:
Pt McIntyre NGLs at CGF gas equivalent = 25,448; Pt McIntyre LPC Rich Gas NGLs at CGF gas equivalent = 4,429 and
Lisburne LPC Rich Gas NGLs at CGF gas equivalent = 7,101;
Block 18: LPC Rich Gas to CGF = 1,803,820
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number 3. Field 4. Operator 5. Month/Year of Disposition
0290000009 PBU - GPMA Hilcorp July-2024
Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold 134,804 Pool Name Pool Code
7. Reinjected 6,780,936 Prudhoe Bay, Lisburne Oil 640144
Prudhoe Bay, Niakuk Oil 640148
8. Flared or vented 1 hour or less 191 Prudhoe Bay, W Bch Tr Un 640187
Prudhoe Bay, Sag Riv Undef 640165
9. Flared or vented more than 1 hour (see instr.)0 Prudhoe Bay, Prudhoe Oil 640150
Prudhoe Bay, W Beach Oil 640186
10. Pilot and Purge 12,079 Prudhoe Bay, Pt M Stump Is 640183
Prudhoe Bay, N Prudhoe Bay 640152
BROOKIAN UND OIL 640132
12. Fuel gas used in lease operations.819,406 AOGCC Use Only
13. Other (see instructions)3,432,512
MCF
Safety:
Lease Use:
14. TOTAL VOLUME (ITEMS 6-13)11,308,120
11. Assist Gas 128,192
MCFAuthorization >1 hr:
Conservation:MCF
15. NGL Gas Equivalent 134,804
MCF
16. Purchased gas 0
Waste:
Contact Phone:Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60° F. Authority 20 AAC 25.235.Contact Email:Richard.Everett@hilcorp.com
Form 10-422 Revised 10/2021
Reviewed by:
COMMISSIONER
Title: Senior Accounting Advisor
713-757-7133
Comm.Comm.
Block 13: Lift Gas Off Field; Block 17: MI from Prudhoe = 1,821,282 and Fuel Gas from Prudhoe = 0
17. Transferred from:1,821,282
18. Transferred to: (Express as a negative #)-1,803,820
I hereby certify that the foregoing is true and correct to the best of my knowledge. Revision? Date of Revision:
Authorized Name and Digital Signature with Date:
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
Hilcorp Energy Company ALASKA
CONSERVATION ORDER NO. 219
PRUDHOE BAY, PRUDHOE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Jul-24
VOLUME PLANNED
DATE TIME (Mscf)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
7/11/2024 07:35-07:49 11 U
7/19/2024 14:37-15:06 13 U
7/24/2024 00:56-00:57 0 U
Total Flare <= 1 Hour 24
Total Flare > 1 Hour 0
Volume Flared 24
Measured Safety Pilot 1,479
Continuous Assist 15,685
TOTAL FLARED 17,188
Hilcorp Energy Company ALASKA
CONSERVATION ORDER NO. 219
PRUDHOE BAY, LISBURNE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Jul-24
VOLUME PLANNED
DATE TIME (MSCF)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
7/11/2024 07:35-07:49 52 U
7/19/2024 14:37-15:06 49 U
7/24/2024 00:56-00:57 2 U
Total Flare <= 1 Hour 103
Total Flare > 1 Hour 0
Volume Flared 103
Measured Safety Pilot 6,468
Continuous Assist 67,979
TOTAL FLARED 74,550
Hilcorp Energy Company ALASKA
CONSERVATION ORDER NO. 219
PRUDHOE BAY, POINT MCINTYRE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Jul-24
VOLUME PLANNED
DATE TIME (MSCF)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
7/11/2024 07:35-07:49 29 U
7/19/2024 14:37-15:06 34 U
7/24/2024 00:56-00:57 1 U
Total Flare <= 1 Hour 64
Total Flare > 1 Hour 0
Volume Flared 64
Measured Safety Pilot 4,044
Continuous Assist 43,604
TOTAL FLARED 47,712
Hilcorp Energy Company ALASKA
CONSERVATION ORDER NO. 219
PRUDHOE BAY, WEST BEACH
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Jul-24
VOLUME PLANNED
DATE TIME (MSCF)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
7/11/2024 07:35-07:49 0 U
7/19/2024 14:37-15:06 0 U
7/24/2024 00:56-00:57 0 U
Total Flare <= 1 Hour 0
Total Flare > 1 Hour 0
Volume Flared 0
Measured Safety Pilot 0
Continuous Assist 0
TOTAL FLARED 0
Hilcorp Energy Company ALASKA
CONSERVATION ORDER NO. 219
PRUDHOE BAY, NORTH PRUDHOE BAY
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Jul-24
VOLUME PLANNED
DATE TIME (MSCF)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
7/11/2024 07:35-07:49 0 U
7/19/2024 14:37-15:06 0 U
7/24/2024 00:56-00:57 0 U
Total Flare <= 1 Hour 0
Total Flare > 1 Hour 0
Volume Flared 0
Measured Safety Pilot 0
Continuous Assist 0
TOTAL FLARED 0
Hilcorp Energy Company ALASKA
CONSERVATION ORDER NO. 219
PRUDHOE BAY, COMBINED NIAKUK
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Jul-24
VOLUME PLANNED
DATE TIME (Mscf)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
7/11/2024 07:35-07:49 0 U
7/19/2024 14:37-15:06 0 U
7/24/2024 00:56-00:57 0 U
Total Flare <= 1 Hour 0
Total Flare > 1 Hour 0
Volume Flared 0
Measured Safety Pilot 37
Continuous Assist 378
TOTAL FLARED 415
Hilcorp Energy Company ALASKA
CONSERVATION ORDER NO. 219
PRUDHOE BAY, RAVEN
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Jul-24
VOLUME PLANNED
DATE TIME (Mscf)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
7/11/2024 07:35-07:49 0 U
7/19/2024 14:37-15:06 0 U
7/24/2024 00:56-00:57 0 U
Total Flare <= 1 Hour 0
Total Flare > 1 Hour 0
Volume Flared 0
Measured Safety Pilot 51
Continuous Assist 546
TOTAL FLARED 597
2. Facility Name
PBU LISBURNE PROD (GPMA)
Percent
53.3%
0.1%
0.0%
0.4%
11.8%
0.0%
0.4%
0.0%
0.0%
19. Remarks:
Pt McIntyre NGLs at CGF gas equivalent = 20,890; Pt McIntyre LPC Rich Gas NGLs at CGF gas equivalent = 4,129 and
Lisburne LPC Rich Gas NGLs at CGF gas equivalent = 6,529;
Block 18: LPC Rich Gas to CGF = 1,729,546
Form 10-422 Revised 10/2021
Reviewed by:
COMMISSIONER
Title: Senior Accounting Advisor
713-757-7133
Comm.Comm.
Block 13: Lift Gas Off Field; Block 17: MI from Prudhoe = 1,418,129 and Fuel Gas from Prudhoe = 0
17. Transferred from:1,418,129
18. Transferred to: (Express as a negative #)-1,729,546
I hereby certify that the foregoing is true and correct to the best of my knowledge. Revision? Date of Revision:
Authorized Name and Digital Signature with Date:
Contact Phone:Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60° F. Authority 20 AAC 25.235.Contact Email:Richard.Everett@hilcorp.com
MCFAuthorization >1 hr:
Conservation:MCF
15. NGL Gas Equivalent 120,680
MCF
16. Purchased gas 0
Waste:
BROOKIAN UND OIL 640132
12. Fuel gas used in lease operations.820,082 AOGCC Use Only
13. Other (see instructions)3,460,515
MCF
Safety:
Lease Use:
14. TOTAL VOLUME (ITEMS 6-13)11,248,073
11. Assist Gas 118,477
10. Pilot and Purge 12,448 Prudhoe Bay, Pt M Stump Is 640183
Prudhoe Bay, N Prudhoe Bay 640152
9. Flared or vented more than 1 hour (see instr.)0 Prudhoe Bay, Prudhoe Oil 640150
Prudhoe Bay, W Beach Oil 640186
Prudhoe Bay, Niakuk Oil 640148
8. Flared or vented 1 hour or less 214 Prudhoe Bay, W Bch Tr Un 640187
Prudhoe Bay, Sag Riv Undef 640165
0290000009 PBU - GPMA Hilcorp August-2024
Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold 120,680 Pool Name Pool Code
7. Reinjected 6,715,657 Prudhoe Bay, Lisburne Oil 640144
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number 3. Field 4. Operator 5. Month/Year of Disposition
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
Hilcorp Energy Company ALASKA
CONSERVATION ORDER NO. 219
PRUDHOE BAY, PRUDHOE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Aug-24
VOLUME PLANNED
DATE TIME (Mscf)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
8/10/2024 14:01-14:33 24 U
Total Flare <= 1 Hour 24
Total Flare > 1 Hour 0
Volume Flared 24
Measured Safety Pilot 1,467
Continuous Assist 14,006
TOTAL FLARED 15,497
Hilcorp Energy Company ALASKA
CONSERVATION ORDER NO. 219
PRUDHOE BAY, LISBURNE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Aug-24
VOLUME PLANNED
DATE TIME (MSCF)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
8/10/2024 14:01-14:33 116 U
Total Flare <= 1 Hour 116
Total Flare > 1 Hour 0
Volume Flared 116
Measured Safety Pilot 6,639
Continuous Assist 63,141
TOTAL FLARED 69,896
Hilcorp Energy Company ALASKA
CONSERVATION ORDER NO. 219
PRUDHOE BAY, POINT MCINTYRE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Aug-24
VOLUME PLANNED
DATE TIME (MSCF)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
8/10/2024 14:01-14:33 72 U
Total Flare <= 1 Hour 72
Total Flare > 1 Hour 0
Volume Flared 72
Measured Safety Pilot 4,200
Continuous Assist 39,843
TOTAL FLARED 44,115
Hilcorp Energy Company ALASKA
CONSERVATION ORDER NO. 219
PRUDHOE BAY, WEST BEACH
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Aug-24
VOLUME PLANNED
DATE TIME (MSCF)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
8/10/2024 14:01-14:33 0 U
Total Flare <= 1 Hour 0
Total Flare > 1 Hour 0
Volume Flared 0
Measured Safety Pilot 0
Continuous Assist 0
TOTAL FLARED 0
Hilcorp Energy Company ALASKA
CONSERVATION ORDER NO. 219
PRUDHOE BAY, NORTH PRUDHOE BAY
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Aug-24
VOLUME PLANNED
DATE TIME (MSCF)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
8/10/2024 14:01-14:33 0 U
Total Flare <= 1 Hour 0
Total Flare > 1 Hour 0
Volume Flared 0
Measured Safety Pilot 0
Continuous Assist 0
TOTAL FLARED 0
Hilcorp Energy Company ALASKA
CONSERVATION ORDER NO. 219
PRUDHOE BAY, COMBINED NIAKUK
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Aug-24
VOLUME PLANNED
DATE TIME (Mscf)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
8/10/2024 14:01-14:33 1 U
Total Flare <= 1 Hour 1
Total Flare > 1 Hour 0
Volume Flared 1
Measured Safety Pilot 14
Continuous Assist 147
TOTAL FLARED 162
Hilcorp Energy Company ALASKA
CONSERVATION ORDER NO. 219
PRUDHOE BAY, RAVEN
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Aug-24
VOLUME PLANNED
DATE TIME (Mscf)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
8/10/2024 14:01-14:33 1 U
Total Flare <= 1 Hour 1
Total Flare > 1 Hour 0
Volume Flared 1
Measured Safety Pilot 128
Continuous Assist 1,340
TOTAL FLARED 1,469
2. Facility Name
PBU LISBURNE PROD (GPMA)
Percent
53.6%
0.0%
0.0%
0.3%
11.0%
0.0%
0.7%
0.0%
0.0%
19. Remarks:
Pt McIntyre NGLs at CGF gas equivalent = 24,017; Pt McIntyre LPC Rich Gas NGLs at CGF gas equivalent = 3,770 and
Lisburne LPC Rich Gas NGLs at CGF gas equivalent =5,756;
Block 18: LPC Rich Gas to CGF = 1,659,075
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number 3. Field 4. Operator 5. Month/Year of Disposition
0290000009 PBU - GPMA Hilcorp September-2024
Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold 127,400 Pool Name Pool Code
7. Reinjected 6,938,532 Prudhoe Bay, Lisburne Oil 640144
Prudhoe Bay, Niakuk Oil 640148
8. Flared or vented 1 hour or less 6,391 Prudhoe Bay, W Bch Tr Un 640187
Prudhoe Bay, Sag Riv Undef 640165
9. Flared or vented more than 1 hour (see instr.)0 Prudhoe Bay, Prudhoe Oil 640150
Prudhoe Bay, W Beach Oil 640186
10. Pilot and Purge 12,228 Prudhoe Bay, Pt M Stump Is 640183
Prudhoe Bay, N Prudhoe Bay 640152
BROOKIAN UND OIL 640132
12. Fuel gas used in lease operations.798,187 AOGCC Use Only
13. Other (see instructions)3,405,745
MCF
Safety:
Lease Use:
14. TOTAL VOLUME (ITEMS 6-13)11,428,158
11. Assist Gas 139,675
MCFAuthorization >1 hr:
Conservation:MCF
15. NGL Gas Equivalent 127,400
MCF
16. Purchased gas 0
Waste:
Contact Phone:Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60° F. Authority 20 AAC 25.235.Contact Email:Richard.Everett@hilcorp.com
Form 10-422 Revised 10/2021
Reviewed by:
COMMISSIONER
Title: Senior Accounting Advisor
713-757-7133
Comm.Comm.
Block 13: Lift Gas Off Field; Block 17: MI from Prudhoe = 1,904,263 and Fuel Gas from Prudhoe = 0
17. Transferred from:1,904,263
18. Transferred to: (Express as a negative #)-1,659,075
I hereby certify that the foregoing is true and correct to the best of my knowledge. Revision? Date of Revision:
Authorized Name and Digital Signature with Date:
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
Hilcorp Energy Company ALASKA
CONSERVATION ORDER NO. 219
PRUDHOE BAY, PRUDHOE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Sep-24
VOLUME PLANNED
DATE TIME (Mscf)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
9/23/2024 07:35-08:14 506 U
9/23/2024 11:18-11:19 1 U
9/23/2024 17:10-17:13 23 U
9/23/2024 18:52-18:53 9 U
9/24/2024 8:28-8:44 133 U
9/24/2024 14:02-14:07 22 U
9/24/2024 14:38-14:41 25 U
9/24/2024 15:31-15:32 9 U
9/24/2024 15:58-15:59 26 U
9/24/2024 17:11-17:13 30 U
9/24/2024 22:08-22:09 5 U
9/24/2024 23:34-23:35 1 U
Total Flare <= 1 Hour 790
Total Flare > 1 Hour 0
Volume Flared 790
Measured Safety Pilot 1,351
Continuous Assist 15,468
TOTAL FLARED 17,609
Hilcorp Energy Company ALASKA
CONSERVATION ORDER NO. 219
PRUDHOE BAY, LISBURNE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Sep-24
VOLUME PLANNED
DATE TIME (MSCF)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
9/23/2024 07:35-08:14 2,184 U
9/23/2024 11:18-11:19 6 U
9/23/2024 17:10-17:13 97 U
9/23/2024 18:52-18:53 39 U
9/24/2024 8:28-8:44 572 U
9/24/2024 14:02-14:07 95 U
9/24/2024 14:38-14:41 107 U
9/24/2024 15:31-15:32 38 U
9/24/2024 15:58-15:59 110 U
9/24/2024 17:11-17:13 134 U
9/24/2024 22:08-22:09 21 U
9/24/2024 23:34-23:35 6 U
Total Flare <= 1 Hour 3,409
Total Flare > 1 Hour 0
Volume Flared 3,409
Measured Safety Pilot 6,545
Continuous Assist 74,819
TOTAL FLARED 84,773
Hilcorp Energy Company ALASKA
CONSERVATION ORDER NO. 219
PRUDHOE BAY, POINT MCINTYRE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Sep-24
VOLUME PLANNED
DATE TIME (MSCF)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
9/23/2024 07:35-08:14 1,381 U
9/23/2024 11:18-11:19 4 U
9/23/2024 17:10-17:13 61 U
9/23/2024 18:52-18:53 25 U
9/24/2024 8:28-8:44 362 U
9/24/2024 14:02-14:07 60 U
9/24/2024 14:38-14:41 67 U
9/24/2024 15:31-15:32 24 U
9/24/2024 15:58-15:59 70 U
9/24/2024 17:11-17:13 85 U
9/24/2024 22:08-22:09 13 U
9/24/2024 23:34-23:35 4 U
Total Flare <= 1 Hour 2,156
Total Flare > 1 Hour 0
Volume Flared 2,156
Measured Safety Pilot 4,288
Continuous Assist 48,888
TOTAL FLARED 55,332
Hilcorp Energy Company ALASKA
CONSERVATION ORDER NO. 219
PRUDHOE BAY, WEST BEACH
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Sep-24
VOLUME PLANNED
DATE TIME (MSCF)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
9/23/2024 07:35-08:14 0 U
9/23/2024 11:18-11:19 0 U
9/23/2024 17:10-17:13 0 U
9/23/2024 18:52-18:53 0 U
9/24/2024 8:28-8:44 0 U
9/24/2024 14:02-14:07 0 U
9/24/2024 14:38-14:41 0 U
9/24/2024 15:31-15:32 0 U
9/24/2024 15:58-15:59 0 U
9/24/2024 17:11-17:13 0 U
9/24/2024 22:08-22:09 0 U
9/24/2024 23:34-23:35 0 U
Total Flare <= 1 Hour 0
Total Flare > 1 Hour 0
Volume Flared 0
Measured Safety Pilot 0
Continuous Assist 0
TOTAL FLARED 0
Hilcorp Energy Company ALASKA
CONSERVATION ORDER NO. 219
PRUDHOE BAY, NORTH PRUDHOE BAY
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Sep-24
VOLUME PLANNED
DATE TIME (MSCF)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
9/23/2024 07:35-08:14 0 U
9/23/2024 11:18-11:19 0 U
9/23/2024 17:10-17:13 0 U
9/23/2024 18:52-18:53 0 U
9/24/2024 8:28-8:44 0 U
9/24/2024 14:02-14:07 0 U
9/24/2024 14:38-14:41 0 U
9/24/2024 15:31-15:32 0 U
9/24/2024 15:58-15:59 0 U
9/24/2024 17:11-17:13 0 U
9/24/2024 22:08-22:09 0 U
9/24/2024 23:34-23:35 0 U
Total Flare <= 1 Hour 0
Total Flare > 1 Hour 0
Volume Flared 0
Measured Safety Pilot 0
Continuous Assist 0
TOTAL FLARED 0
Hilcorp Energy Company ALASKA
CONSERVATION ORDER NO. 219
PRUDHOE BAY, COMBINED NIAKUK
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Sep-24
VOLUME PLANNED
DATE TIME (Mscf)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
9/23/2024 07:35-08:14 2 U
9/23/2024 11:18-11:19 0 U
9/23/2024 17:10-17:13 0 U
9/23/2024 18:52-18:53 0 U
9/24/2024 8:28-8:44 1 U
9/24/2024 14:02-14:07 0 U
9/24/2024 14:38-14:41 0 U
9/24/2024 15:31-15:32 0 U
9/24/2024 15:58-15:59 0 U
9/24/2024 17:11-17:13 1 U
9/24/2024 22:08-22:09 0 U
9/24/2024 23:34-23:35 0 U
Total Flare <= 1 Hour 4
Total Flare > 1 Hour 0
Volume Flared 4
Measured Safety Pilot 3
Continuous Assist 31
TOTAL FLARED 38
Hilcorp Energy Company ALASKA
CONSERVATION ORDER NO. 219
PRUDHOE BAY, RAVEN
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Sep-24
VOLUME PLANNED
DATE TIME (Mscf)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
9/23/2024 07:35-08:14 21 U
9/23/2024 11:18-11:19 0 U
9/23/2024 17:10-17:13 1 U
9/23/2024 18:52-18:53 0 U
9/24/2024 8:28-8:44 5 U
9/24/2024 14:02-14:07 1 U
9/24/2024 14:38-14:41 1 U
9/24/2024 15:31-15:32 1 U
9/24/2024 15:58-15:59 1 U
9/24/2024 17:11-17:13 1 U
9/24/2024 22:08-22:09 0 U
9/24/2024 23:34-23:35 0 U
Total Flare <= 1 Hour 32
Total Flare > 1 Hour 0
Volume Flared 32
Measured Safety Pilot 41
Continuous Assist 469
TOTAL FLARED 542
2. Facility Name
PBU LISBURNE PROD (GPMA)
Percent
50.9%
0.1%
0.0%
0.3%
10.9%
0.0%
0.6%
0.0%
0.0%
19. Remarks:
Pt McIntyre NGLs at CGF gas equivalent = 20,336; Pt McIntyre LPC Rich Gas NGLs at CGF gas equivalent = 4,855 and
Lisburne LPC Rich Gas NGLs at CGF gas equivalent =6,624;
Block 18: LPC Rich Gas to CGF = 1,812,263
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
FACILITY REPORT OF PRODUCED GAS DISPOSITION
1. Facility Number 3. Field 4. Operator 5. Month/Year of Disposition
0290000009 PBU - GPMA Hilcorp October-2024
Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of
Total Volume.
6. Sold 138,696 Pool Name Pool Code
7. Reinjected 7,313,238 Prudhoe Bay, Lisburne Oil 640144
Prudhoe Bay, Niakuk Oil 640148
8. Flared or vented 1 hour or less 837 Prudhoe Bay, W Bch Tr Un 640187
Prudhoe Bay, Sag Riv Undef 640165
9. Flared or vented more than 1 hour (see instr.)0 Prudhoe Bay, Prudhoe Oil 640150
Prudhoe Bay, W Beach Oil 640186
10. Pilot and Purge 12,357 Prudhoe Bay, Pt M Stump Is 640183
Prudhoe Bay, N Prudhoe Bay 640152
BROOKIAN UND OIL 640132
12. Fuel gas used in lease operations.883,228 AOGCC Use Only
13. Other (see instructions)3,599,782
MCF
Safety:
Lease Use:
14. TOTAL VOLUME (ITEMS 6-13)12,095,141
11. Assist Gas 147,003
MCFAuthorization >1 hr:
Conservation:MCF
15. NGL Gas Equivalent 138,696
MCF
16. Purchased gas 0
Waste:
Contact Phone:Note: All volumes must be corrected to
pressure of 14.65 psia and to a temperature of
60° F. Authority 20 AAC 25.235.Contact Email:Richard.Everett@hilcorp.com
Form 10-422 Revised 10/2021
Reviewed by:
COMMISSIONER
Title: Senior Accounting Advisor
713-757-7133
Comm.Comm.
Block 13: Lift Gas Off Field; Block 17: MI from Prudhoe = 2,101,944 and Fuel Gas from Prudhoe = 0
17. Transferred from:2,101,944
18. Transferred to: (Express as a negative #)-1,812,263
I hereby certify that the foregoing is true and correct to the best of my knowledge. Revision? Date of Revision:
Authorized Name and Digital Signature with Date:
Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate
Hilcorp Energy Company ALASKA
CONSERVATION ORDER NO. 219
PRUDHOE BAY, PRUDHOE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Oct-24
VOLUME PLANNED
DATE TIME (Mscf)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
10/3/2024 1:18-1:22 20 P
10/3/2024 23:29-23:33 25 P
10/4/2024 13:46-14:00 25 U
10/4/2024 14:45-14:46 15 U
Total Flare <= 1 Hour 85
Total Flare > 1 Hour 0
Volume Flared 85
Measured Safety Pilot 1,346
Continuous Assist 15,999
TOTAL FLARED 17,430
Hilcorp Energy Company ALASKA
CONSERVATION ORDER NO. 219
PRUDHOE BAY, LISBURNE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Oct-24
VOLUME PLANNED
DATE TIME (MSCF)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
10/3/2024 1:18-1:22 125 P
10/3/2024 23:29-23:33 152 P
10/4/2024 13:46-14:00 152 U
10/4/2024 14:45-14:46 90 U
Total Flare <= 1 Hour 519
Total Flare > 1 Hour 0
Volume Flared 519
Measured Safety Pilot 6,309
Continuous Assist 75,263
TOTAL FLARED 82,091
Hilcorp Energy Company ALASKA
CONSERVATION ORDER NO. 219
PRUDHOE BAY, POINT MCINTYRE
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Oct-24
VOLUME PLANNED
DATE TIME (MSCF)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
10/03/24 1:18-1:22 55 P
10/03/24 23:29-23:33 67 P
10/04/24 13:46-14:00 67 U
10/04/24 14:45-14:46 39 U
Total Flare <= 1 Hour 228
Total Flare > 1 Hour 0
Volume Flared 228
Measured Safety Pilot 4,635
Continuous Assist 54,946
TOTAL FLARED 59,809
Hilcorp Energy Company ALASKA
CONSERVATION ORDER NO. 219
PRUDHOE BAY, WEST BEACH
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Oct-24
VOLUME PLANNED
DATE TIME (MSCF)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
10/3/2024 1:18-1:22 0 P
10/3/2024 23:29-23:33 0 P
10/4/2024 13:46-14:00 0 U
10/4/2024 14:45-14:46 0 U
Total Flare <= 1 Hour 0
Total Flare > 1 Hour 0
Volume Flared 0
Measured Safety Pilot 0
Continuous Assist 0
TOTAL FLARED 0
Hilcorp Energy Company ALASKA
CONSERVATION ORDER NO. 219
PRUDHOE BAY, NORTH PRUDHOE BAY
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Oct-24
VOLUME PLANNED
DATE TIME (MSCF)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
10/3/2024 1:18-1:22 0 P
10/3/2024 23:29-23:33 0 P
10/4/2024 13:46-14:00 0 U
10/4/2024 14:45-14:46 0 U
Total Flare <= 1 Hour 0
Total Flare > 1 Hour 0
Volume Flared 0
Measured Safety Pilot 0
Continuous Assist 0
TOTAL FLARED 0
Hilcorp Energy Company ALASKA
CONSERVATION ORDER NO. 219
PRUDHOE BAY, COMBINED NIAKUK
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Oct-24
VOLUME PLANNED
DATE TIME (Mscf)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
10/3/2024 1:18-1:22 0 P
10/3/2024 23:29-23:33 0 P
10/4/2024 13:46-14:00 0 U
10/4/2024 14:45-14:46 1 U
Total Flare <= 1 Hour 1
Total Flare > 1 Hour 0
Volume Flared 1
Measured Safety Pilot 17
Continuous Assist 205
TOTAL FLARED 223
Hilcorp Energy Company ALASKA
CONSERVATION ORDER NO. 219
PRUDHOE BAY, RAVEN
LISBURNE PRODUCTION CENTER
GAS FLARING INCIDENTS
Oct-24
VOLUME PLANNED
DATE TIME (Mscf)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE
10/3/2024 1:18-1:22 1 P
10/3/2024 23:29-23:33 1 P
10/4/2024 13:46-14:00 1 U
10/4/2024 14:45-14:46 1 U
Total Flare <= 1 Hour 4
Total Flare > 1 Hour 0
Volume Flared 4
Measured Safety Pilot 50
Continuous Assist 590
TOTAL FLARED 644
2. Facility NamePBU LISBURNE PROD (GPMA)Percent52.3%0.1%0.0%0.3%9.9%0.0%0.0%0.1%0.0%19. Remarks:Pt McIntyre NGLs at CGF gas equivalent = 20,060; Pt McIntyre LPC Rich Gas NGLs at CGF gas equivalent = 4,353 andLisburne LPC Rich Gas NGLs at CGF gas equivalent =6,078;Block 18: LPC Rich Gas to CGF = 1,775,623STATE OF ALASKAALASKA OIL AND GAS CONSERVATION COMMISSIONFACILITY REPORT OF PRODUCED GAS DISPOSITION1. Facility Number3. Field4. Operator5. Month/Year of Disposition0290000009PBU - GPMAHilcorpNovember-2024DispositionVolume MCF20.For production from multiple pools, list contribution of each pool as a percent ofTotal Volume.6. Sold132,796Pool NamePool Code7. Reinjected7,622,651Prudhoe Bay, Lisburne Oil640144Prudhoe Bay, Niakuk Oil6401488. Flared or vented 1 hour or less0Prudhoe Bay, W Bch Tr Un 640187Prudhoe Bay, Sag Riv Undef 6401659. Flared or vented more than 1 hour (see instr.)10,277Prudhoe Bay, Prudhoe Oil640150Prudhoe Bay, W Beach Oil64018610. Pilot and Purge12,408BROOKIAN UND OIL640132Prudhoe Bay, Pt M Stump Is 640183Prudhoe Bay, N Prudhoe Bay 64015212. Fuel gas used in lease operations.817,167AOGCC Use Only13. Other (see instructions)3,495,107MCFSafety:Lease Use:14. TOTAL VOLUME (ITEMS 6-13)12,229,78511. Assist Gas139,379MCFAuthorization >1 hr:Conservation:MCF15. NGL Gas Equivalent132,796MCF16. Purchased gas0Waste:Contact Phone:Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60° F. Authority 20 AAC 25.235.Contact Email:Richard.Everett@hilcorp.comForm 10-422 Revised 10/2021Reviewed by:COMMISSIONERTitle: Senior Accounting Advisor713-757-7133Comm.Comm.Block 13: Lift Gas Off Field; Block 17: MI from Prudhoe = 2,177,089 and Fuel Gas from Prudhoe = 017. Transferred from:2,177,08918. Transferred to: (Express as a negative #)-1,775,623I hereby certify that the foregoing is true and correct to the best of my knowledge. Revision? Date of Revision: Authorized Name and Digital Signature with Date:Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in DuplicateDigitally signed by Richard Everett (006020)DN: cn=Richard Everett (006020)Date: 2024.12.18 13:41:09 -09'00'Richard Everett (006020):&%Wasty:JLC 7/30/2025
Hilcorp Energy Company ALASKACONSERVATION ORDER NO. 219PRUDHOE BAY, PRUDHOELISBURNE PRODUCTION CENTERGAS FLARING INCIDENTSNov-24VOLUME PLANNEDDATE TIME (Mscf) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSETotal Flare <= 1 Hour011/16/24 5:23:00 - 8:44:00 1,2001808 Reinjection Compressor shutdown because of contol/instrumentation failure @ 38L0019 Overhead Seal Oil Tank level.UEquipment malfunction repaired; Restarted 1808 Reinjection Compressor on second attempt; resumed Normal Operations.Total Flare > 1 Hour1,200Volume Flared 1,200Measured Safety Pilot 1,224Continuous Assist 13,764TOTAL FLARED 16,188
Hilcorp Energy Company ALASKACONSERVATION ORDER NO. 219PRUDHOE BAY, LISBURNELISBURNE PRODUCTION CENTERGAS FLARING INCIDENTSNov-24VOLUME PLANNEDDATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSETotal Flare <= 1 Hour011/16/20245:23:00 - 8:44:00 5,5321808 Reinjection Compressor shutdown because of contol/instrumentation failure @ 38L0019 Overhead Seal Oil Tank level.UEquipment malfunction repaired; Restarted 1808 Reinjection Compressor on second attempt; resumed Normal Operations.Total Flare > 1 Hour5,532Volume Flared 5,532Measured Safety Pilot 6,492Continuous Assist 72,969TOTAL FLARED 84,993
Hilcorp Energy Company ALASKACONSERVATION ORDER NO. 219PRUDHOE BAY, POINT MCINTYRELISBURNE PRODUCTION CENTERGAS FLARING INCIDENTSNov-24VOLUME PLANNEDDATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSETotal Flare <= 1 Hour011/16/24 5:23:00 - 8:44:00 3,4941808 Reinjection Compressor shutdown because of contol/instrumentation failure @ 38L0019 Overhead Seal Oil Tank level.UEquipment malfunction repaired; Restarted 1808 Reinjection Compressor on second attempt; resumed Normal Operations.Total Flare > 1 Hour3,494Volume Flared 3,494Measured Safety Pilot 4,631Continuous Assist 51,968TOTAL FLARED 60,093
Hilcorp Energy Company ALASKACONSERVATION ORDER NO. 219PRUDHOE BAY, WEST BEACHLISBURNE PRODUCTION CENTERGAS FLARING INCIDENTSNov-24VOLUME PLANNEDDATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSETotal Flare <= 1 Hour011/16/24 5:23:00 - 8:44:00 01808 Reinjection Compressor shutdown because of contol/instrumentation failure @ 38L0019 Overhead Seal Oil Tank level.UEquipment malfunction repaired; Restarted 1808 Reinjection Compressor on second attempt; resumed Normal Operations.Total Flare > 1 Hour0Volume Flared 0Measured Safety Pilot 0Continuous Assist 0TOTAL FLARED 0
Hilcorp Energy Company ALASKACONSERVATION ORDER NO. 219PRUDHOE BAY, NORTH PRUDHOE BAYLISBURNE PRODUCTION CENTERGAS FLARING INCIDENTSNov-24VOLUME PLANNEDDATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSETotal Flare <= 1 Hour011/16/24 5:23:00 - 8:44:00 01808 Reinjection Compressor shutdown because of contol/instrumentation failure @ 38L0019 Overhead Seal Oil Tank level.UEquipment malfunction repaired; Restarted 1808 Reinjection Compressor on second attempt; resumed Normal Operations.Total Flare > 1 Hour0Volume Flared 0Measured Safety Pilot 0Continuous Assist 0TOTAL FLARED 0
Hilcorp Energy Company ALASKACONSERVATION ORDER NO. 219PRUDHOE BAY, COMBINED NIAKUKLISBURNE PRODUCTION CENTERGAS FLARING INCIDENTSNov-24VOLUME PLANNEDDATE TIME (Mscf) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSETotal Flare <= 1 Hour011/16/24 5:23:00 - 8:44:00 161808 Reinjection Compressor shutdown because of contol/instrumentation failure @ 38L0019 Overhead Seal Oil Tank level.UEquipment malfunction repaired; Restarted 1808 Reinjection Compressor on second attempt; resumed Normal Operations.Total Flare > 1 Hour16Volume Flared 16Measured Safety Pilot 16Continuous Assist 177TOTAL FLARED 209
BP EXPLORATION ALASKA, INC,CONSERVATION ORDER NO. 219PRUDHOE BAY, BROOKIANLISBURNE PRODUCTION CENTERGAS FLARING INCIDENTSNov-24VOLUME PLANNEDDATE TIME (Mscf) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSETotal Flare <= 1 Hour011/16/245:23:00 - 8:44:00 01808 Reinjection Compressor shutdown because of contol/instrumentation failure @ 38L0019 Overhead Seal Oil Tank level.UEquipment malfunction repaired; Restarted 1808 Reinjection Compressor on second attempt; resumed Normal Operations.Total Flare > 1 Hour0Volume Flared 0Measured Safety Pilot 0Continuous Assist 0TOTAL FLARED 0
Hilcorp Energy Company ALASKACONSERVATION ORDER NO. 219PRUDHOE BAY, RAVENLISBURNE PRODUCTION CENTERGAS FLARING INCIDENTSNov-24VOLUME PLANNEDDATE TIME (Mscf) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSETotal Flare <= 1 Hour011/16/24 5:23:00 - 8:44:00 351808 Reinjection Compressor shutdown because of contol/instrumentation failure @ 38L0019 Overhead Seal Oil Tank level.UEquipment malfunction repaired; Restarted 1808 Reinjection Compressor on second attempt; resumed Normal Operations.Total Flare > 1 Hour35Volume Flared 35Measured Safety Pilot 45Continuous Assist 501TOTAL FLARED 581
2. Facility NamePBU LISBURNE PROD (GPMA)Percent58.0%0.2%0.0%0.3%4.8%0.0%0.0%0.2%0.0%19. Remarks:Pt McIntyre NGLs at CGF gas equivalent = 22,102; Pt McIntyre LPC Rich Gas NGLs at CGF gas equivalent = 3,467 andLisburne LPC Rich Gas NGLs at CGF gas equivalent =5,540;Block 18: LPC Rich Gas to CGF = 1,620,540Form 10-422 Revised 10/2021Reviewed by:COMMISSIONERTitle: Senior Accounting Advisor713-757-7133Comm. Comm.Block 13: Lift Gas Off Field; Block 17: MI from Prudhoe = 2,289,918 and Fuel Gas from Prudhoe = 017. Transferred from:2,289,91818. Transferred to: (Express as a negative #)-1,620,540I hereby certify that the foregoing is true and correct to the best of my knowledge. Revision? Date of Revision:Authorized Name and Digital Signature with Date:Contact Phone:Note:All volumes must be corrected topressure of 14.65 psia and to a temperature of60° F. Authority 20 AAC 25.235.Contact Email:Richard.Everett@hilcorp.comMCFAuthorization >1 hr:Conservation: MCF15. NGL Gas Equivalent126,671MCF16. Purchased gas0Waste:Prudhoe Bay, N Prudhoe Bay 64015212. Fuel gas used in lease operations.964,012AOGCC Use Only13. Other (see instructions)3,385,120MCFSafety:Lease Use:14. TOTAL VOLUME (ITEMS 6-13)12,254,66211. Assist Gas144,21410. Pilot and Purge12,740BROOKIAN UND OIL 640132Prudhoe Bay, Pt M Stump Is 6401839. Flared or vented more than 1 hour (see instr.)419Prudhoe Bay, Prudhoe Oil 640150Prudhoe Bay, W Beach Oil 640186Prudhoe Bay, Niakuk Oil 6401488. Flared or vented 1 hour or less3,933Prudhoe Bay, W Bch Tr Un 640187Prudhoe Bay, Sag Riv Undef 6401650290000009 PBU - GPMA Hilcorp December-2024Disposition Volume MCF20.For production from multiple pools, list contribution of each pool as a percent ofTotal Volume.6. Sold126,671Pool Name Pool Code7. Reinjected7,617,553Prudhoe Bay, Lisburne Oil 640144STATE OF ALASKAALASKA OIL AND GAS CONSERVATION COMMISSIONFACILITY REPORT OF PRODUCED GAS DISPOSITION1. Facility Number 3. Field 4. Operator 5. Month/Year of DispositionForm 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in DuplicateDigitally signed by Richard Everett (006020)DN: cn=Richard Everett (006020)Date: 2025.01.18 15:40:31 -09'00'Richard Everett (006020):&%JLC 7/30/2025
Hilcorp Energy Company ALASKACONSERVATION ORDER NO. 219PRUDHOE BAY, PRUDHOELISBURNE PRODUCTION CENTERGAS FLARING INCIDENTSDec-24VOLUME PLANNEDDATE TIME (Mscf) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE12/12/202421:18 - 22:00 18Phase 3 weather conditions caused total blackout; tripping generators; 1800, 1807, & 1808 compressors shut down; operator flare vent valves opened.UShut-in flow from all drill site locations; compressors completed shut-down sequence12/31/202414:33 - 14:34 01801 Compressor did not react quick enough to a flow upset from EST 1203 to COSD 1205 resulting in Pressure Release into LP Flare.U Took manual control of the flow valve.Total Flare <= 1 Hour1812/13/20245:00 - 15:00 0Intermittent flaring of STV Compressor and HP while bringing equipment back online following power outage.USuccessfully brought rate back online as power was restored.12/15/20240:00 - 20:00 2 Equipment shutdown due to power outage. USuccessfully brought rate back online as power was restored.12/15/20240:01 - 22:00 01807 Reinjection Compressor shutdown due to control/instumentation failure associated with power outageU 1807/1808 restartedTotal Flare > 1 Hour2Volume Flared 20Measured Safety Pilot 582Continuous Assist 6,626TOTAL FLARED 7,228
Hilcorp Energy Company ALASKACONSERVATION ORDER NO. 219PRUDHOE BAY, LISBURNELISBURNE PRODUCTION CENTERGAS FLARING INCIDENTSDec-24VOLUME PLANNEDDATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE12/12/202421:18 - 22:00 2,345Phase 3 weather conditions caused total blackout; tripping generators; 1800, 1807, & 1808 compressors shut down; operator flare vent valves opened.UShut-in flow from all drill site locations; compressors completed shut-down sequence12/31/202414:33 - 14:34 01801 Compressor did not react quick enough to a flow upset from EST 1203 to COSD 1205 resulting in Pressure Release into LP Flare.U Took manual control of the flow valve.Total Flare <= 1 Hour2,34512/13/20245:00 - 15:00 96Intermittent flaring of STV Compressor and HP while bringing equipment back online following power outage.USuccessfully brought rate back online as power was restored.12/15/20240:00 - 20:00 119Equipment shutdown due to power outage. USuccessfully brought rate back online as power was restored.12/15/20240:01 - 22:00 41807 Reinjection Compressor shutdown due to control/instumentation failure associated with power outageU 1807/1808 restartedTotal Flare > 1 Hour219Volume Flared 2,564Measured Safety Pilot 7,376Continuous Assist 83,446TOTAL FLARED 93,386
Hilcorp Energy Company ALASKACONSERVATION ORDER NO. 219PRUDHOE BAY, POINT MCINTYRELISBURNE PRODUCTION CENTERGAS FLARING INCIDENTSDec-24VOLUME PLANNEDDATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE12/12/202421:18 - 22:00 1,547Phase 3 weather conditions caused total blackout; tripping generators; 1800, 1807, & 1808 compressors shut down; operator flare vent valves opened.UShut-in flow from all drill site locations; compressors completed shut-down sequence12/31/202414:33 - 14:34 11801 Compressor did not react quick enough to a flow upset from EST 1203 to COSD 1205 resulting in Pressure Release into LP Flare.U Took manual control of the flow valve.Total Flare <= 1 Hour1,54812/13/20245:00 - 15:00 101Intermittent flaring of STV Compressor and HP while bringing equipment back online following power outage.USuccessfully brought rate back online as power was restored.12/15/20240:00 - 20:00 93 Equipment shutdown due to power outage. USuccessfully brought rate back online as power was restored.12/15/20240:01 - 22:00 31807 Reinjection Compressor shutdown due to control/instumentation failure associated with power outageU 1807/1808 restartedTotal Flare > 1 Hour197Volume Flared 1,745Measured Safety Pilot 4,721Continuous Assist 53,450TOTAL FLARED 59,916
Hilcorp Energy Company ALASKACONSERVATION ORDER NO. 219PRUDHOE BAY, WEST BEACHLISBURNE PRODUCTION CENTERGAS FLARING INCIDENTSDec-24VOLUME PLANNEDDATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE12/12/202421:18 - 22:00 0Phase 3 weather conditions caused total blackout; tripping generators; 1800, 1807, & 1808 compressors shut down; operator flare vent valves opened.UShut-in flow from all drill site locations; compressors completed shut-down sequence12/31/202414:33 - 14:34 01801 Compressor did not react quick enough to a flow upset from EST 1203 to COSD 1205 resulting in Pressure Release into LP Flare.U Took manual control of the flow valve.Total Flare <= 1 Hour012/13/20245:00 - 15:00 0Intermittent flaring of STV Compressor and HP while bringing equipment back online following power outage.USuccessfully brought rate back online as power was restored.12/15/20240:00 - 20:00 0 Equipment shutdown due to power outage. USuccessfully brought rate back online as power was restored.12/15/20240:01 - 22:00 01807 Reinjection Compressor shutdown due to control/instumentation failure associated with power outageU 1807/1808 restartedTotal Flare > 1 Hour0Volume Flared 0Measured Safety Pilot 0Continuous Assist 0TOTAL FLARED 0
Hilcorp Energy Company ALASKACONSERVATION ORDER NO. 219PRUDHOE BAY, NORTH PRUDHOE BAYLISBURNE PRODUCTION CENTERGAS FLARING INCIDENTSDec-24VOLUME PLANNEDDATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE12/12/202421:18 - 22:00 0Phase 3 weather conditions caused total blackout; tripping generators; 1800, 1807, & 1808 compressors shut down; operator flare vent valves opened.UShut-in flow from all drill site locations; compressors completed shut-down sequence12/31/202414:33 - 14:34 01801 Compressor did not react quick enough to a flow upset from EST 1203 to COSD 1205 resulting in Pressure Release into LP Flare.U Took manual control of the flow valve.Total Flare <= 1 Hour012/13/20245:00 - 15:00 0Intermittent flaring of STV Compressor and HP while bringing equipment back online following power outage.USuccessfully brought rate back online as power was restored.12/15/20240:00 - 20:00 0 Equipment shutdown due to power outage. USuccessfully brought rate back online as power was restored.12/15/20240:01 - 22:00 01807 Reinjection Compressor shutdown due to control/instumentation failure associated with power outageU 1807/1808 restartedTotal Flare > 1 Hour0Volume Flared 0Measured Safety Pilot 0Continuous Assist 0TOTAL FLARED 0
Hilcorp Energy Company ALASKACONSERVATION ORDER NO. 219PRUDHOE BAY, COMBINED NIAKUKLISBURNE PRODUCTION CENTERGAS FLARING INCIDENTSDec-24VOLUME PLANNEDDATE TIME (Mscf) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE12/12/202421:18 - 22:00 7Phase 3 weather conditions caused total blackout; tripping generators; 1800, 1807, & 1808 compressors shut down; operator flare vent valves opened.UShut-in flow from all drill site locations; compressors completed shut-down sequence12/31/202414:33 - 14:34 01801 Compressor did not react quick enough to a flow upset from EST 1203 to COSD 1205 resulting in Pressure Release into LP Flare.U Took manual control of the flow valve.Total Flare <= 1 Hour712/13/20245:00 - 15:00 0Intermittent flaring of STV Compressor and HP while bringing equipment back online following power outage.USuccessfully brought rate back online as power was restored.12/15/20240:00 - 20:00 0 Equipment shutdown due to power outage. USuccessfully brought rate back online as power was restored.12/15/20240:01 - 22:0001807 Reinjection Compressor shutdown due to control/instumentation failure associated with power outageU 1807/1808 restartedTotal Flare > 1 Hour0Volume Flared 7Measured Safety Pilot 18Continuous Assist 209TOTAL FLARED 234
Hilcorp Energy Company ALASKACONSERVATION ORDER NO. 219PRUDHOE BAY, BROOKIANLISBURNE PRODUCTION CENTERGAS FLARING INCIDENTSDec-24VOLUME PLANNEDDATE TIME (Mscf) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE12/12/202421:18 - 22:00 0Phase 3 weather conditions caused total blackout; tripping generators; 1800, 1807, & 1808 compressors shut down; operator flare vent valves opened.UShut-in flow from all drill site locations; compressors completed shut-down sequence12/31/202414:33 - 14:34 01801 Compressor did not react quick enough to a flow upset from EST 1203 to COSD 1205 resulting in Pressure Release into LP Flare.U Took manual control of the flow valve.Total Flare <= 1 Hour012/13/20245:00 - 15:00 0Intermittent flaring of STV Compressor and HP while bringing equipment back online following power outage.USuccessfully brought rate back online as power was restored.12/15/20240:00 - 20:00 0 Equipment shutdown due to power outage. USuccessfully brought rate back online as power was restored.12/15/20240:01 - 22:00 01807 Reinjection Compressor shutdown due to control/instumentation failure associated with power outageU 1807/1808 restartedTotal Flare > 1 Hour0Volume Flared 0Measured Safety Pilot 0Continuous Assist 0TOTAL FLARED 0
Hilcorp Energy Company ALASKACONSERVATION ORDER NO. 219PRUDHOE BAY, RAVENLISBURNE PRODUCTION CENTERGAS FLARING INCIDENTSDec-24VOLUME PLANNEDDATE TIME (Mscf) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE12/12/202421:18 - 22:00 15Phase 3 weather conditions caused total blackout; tripping generators; 1800, 1807, & 1808 compressors shut down; operator flare vent valves opened.UShut-in flow from all drill site locations; compressors completed shut-down sequence12/31/202414:33 - 14:34 01801 Compressor did not react quick enough to a flow upset from EST 1203 to COSD 1205 resulting in Pressure Release into LP Flare.U Took manual control of the flow valve.Total Flare <= 1 Hour1512/13/24 5:00 - 15:00 0Intermittent flaring of STV Compressor and HP while bringing equipment back online following power outage.USuccessfully brought rate back online as power was restored.12/15/24 0:00 - 20:00 1 Equipment shutdown due to power outage. USuccessfully brought rate back online as power was restored.12/15/24 0:01 - 22:00 01807 Reinjection Compressor shutdown due to control/instumentation failure associated with power outageU 1807/1808 restartedTotal Flare > 1 Hour1Volume Flared 16Measured Safety Pilot 43Continuous Assist 483TOTAL FLARED 542