Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAboutPBU Lisburne (GPMA) - Hilcorp North Slope, LLC2. Facility Name PBU LISBURNE PROD (GPMA) Percent 57.3% 0.3% 0.0% 0.3% 13.1% 0.0% 0.0% 0.4% 28.6% 19. Remarks: Pt McIntyre NGLs at CGF gas equivalent = 27,437; Pt McIntyre LPC Rich Gas NGLs at CGF gas equivalent = 3,953 and Lisburne LPC Rich Gas NGLs at CGF gas equivalent = 8,115; Block 18: LPC Rich Gas to CGF = 1,658,519 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 3. Field 4. Operator 5. Month/Year of Disposition 0290000009 PBU - GPMA Hilcorp January-2024 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 159,530 Pool Name Pool Code 7. Reinjected 8,565,984 Prudhoe Bay, Lisburne Oil 640144 Prudhoe Bay, Niakuk Oil 640148 8. Flared or vented 1 hour or less 26 Prudhoe Bay, W Bch Tr Un 640187 Prudhoe Bay, Sag Riv Undef 640165 9. Flared or vented more than 1 hour (see instr.)0 Prudhoe Bay, Prudhoe Oil 640150 Prudhoe Bay, W Beach Oil 640186 10. Pilot and Purge 13,205 Prudhoe Bay, N Prudhoe Bay 640152 Prudhoe Bay, Raven Oil 640147 Prudhoe Bay, Pt Mcintyre Oil 640180 12. Fuel gas used in lease operations.914,334 AOGCC Use Only 13. Other (see instructions)3,783,419 MCF Safety: Lease Use: 14. TOTAL VOLUME (ITEMS 6-13)13,552,287 11. Assist Gas 115,789 MCFAuthorization >1 hr: Conservation:MCF 15. NGL Gas Equivalent 159,530 MCF 16. Purchased gas 0 Waste: Contact Phone:Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60° F. Authority 20 AAC 25.235.Contact Email:Richard.Everett@hilcorp.com Form 10-422 Revised 10/2021 Reviewed by: COMMISSIONER Title: Senior Accounting Advisor 713-757-7133 Comm.Comm. Block 13: Lift Gas Off Field; Block 17: MI from Prudhoe = 2,642,064 and Fuel Gas from Prudhoe = 0 17. Transferred from:2,642,064 18. Transferred to: (Express as a negative #)-1,658,519 I hereby certify that the foregoing is true and correct to the best of my knowledge. Revision? Date of Revision: Authorized Name and Digital Signature with Date: Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate Hilcorp Energy Company ALASKA CONSERVATION ORDER NO. 219 PRUDHOE BAY, PRUDHOE LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Jan-24 VOLUME PLANNED DATE TIME (Mscf)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 1/2/2024 15:00-15:01 2 U 1/16/2024 5:32-5:34 2 U Total Flare <= 1 Hour 4 Total Flare > 1 Hour 0 Volume Flared 4 Measured Safety Pilot 1,730 Continuous Assist 15,198 TOTAL FLARED 16,932 Hilcorp Energy Company ALASKA CONSERVATION ORDER NO. 219 PRUDHOE BAY, LISBURNE LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Jan-24 VOLUME PLANNED DATE TIME (MSCF)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 1/2/2024 15:00-15:01 7 U 1/16/2024 5:32-5:34 8 U Total Flare <= 1 Hour 15 Total Flare > 1 Hour 0 Volume Flared 15 Measured Safety Pilot 7,568 Continuous Assist 66,278 TOTAL FLARED 73,861 Hilcorp Energy Company ALASKA CONSERVATION ORDER NO. 219 PRUDHOE BAY, POINT MCINTYRE LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Jan-24 VOLUME PLANNED DATE TIME (MSCF)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 1/2/2024 15:00-15:01 4 U 1/16/2024 5:32-5:34 3 U Total Flare <= 1 Hour 7 Total Flare > 1 Hour 0 Volume Flared 7 Measured Safety Pilot 3,776 Continuous Assist 33,162 TOTAL FLARED 36,945 Hilcorp Energy Company ALASKA CONSERVATION ORDER NO. 219 PRUDHOE BAY, WEST BEACH LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Jan-24 VOLUME PLANNED DATE TIME (MSCF)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 1/2/2024 15:00-15:01 0 U 1/16/2024 5:32-5:34 0 U Total Flare <= 1 Hour 0 Total Flare > 1 Hour 0 Volume Flared 0 Measured Safety Pilot 0 Continuous Assist 0 TOTAL FLARED 0 Hilcorp Energy Company ALASKA CONSERVATION ORDER NO. 219 PRUDHOE BAY, NORTH PRUDHOE BAY LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Jan-24 VOLUME PLANNED DATE TIME (MSCF)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 1/2/2024 15:00-15:01 0 U 1/16/2024 5:32-5:34 0 U Total Flare <= 1 Hour 0 Total Flare > 1 Hour 0 Volume Flared 0 Measured Safety Pilot 0 Continuous Assist 0 TOTAL FLARED 0 Hilcorp Energy Company ALASKA CONSERVATION ORDER NO. 219 PRUDHOE BAY, COMBINED NIAKUK LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Jan-24 VOLUME PLANNED DATE TIME (Mscf)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 1/2/2024 15:00-15:01 0 U 1/16/2024 5:32-5:34 0 U Total Flare <= 1 Hour 0 Total Flare > 1 Hour 0 Volume Flared 0 Measured Safety Pilot 37 Continuous Assist 327 TOTAL FLARED 364 Hilcorp Energy Company ALASKA CONSERVATION ORDER NO. 219 PRUDHOE BAY, RAVEN LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Jan-24 VOLUME PLANNED DATE TIME (Mscf)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 1/2/2024 15:00-15:01 0 U 1/16/2024 5:32-5:34 0 U Total Flare <= 1 Hour 0 Total Flare > 1 Hour 0 Volume Flared 0 Measured Safety Pilot 94 Continuous Assist 824 TOTAL FLARED 918 2. Facility Name PBU LISBURNE PROD (GPMA) Percent 62.0% 0.2% 0.0% 0.1% 12.3% 0.0% 0.0% 0.5% 24.9% 19. Remarks: Pt McIntyre NGLs at CGF gas equivalent = 26,085; Pt McIntyre LPC Rich Gas NGLs at CGF gas equivalent = 3,822 and Lisburne LPC Rich Gas NGLs at CGF gas equivalent = 9,549; Block 18: LPC Rich Gas to CGF = 1,724,709 Form 10-422 Revised 10/2021 Reviewed by: COMMISSIONER Title: Senior Accounting Advisor 713-757-7133 Comm.Comm. Block 13: Lift Gas Off Field; Block 17: MI from Prudhoe = 2,525,813 and Fuel Gas from Prudhoe = 0 17. Transferred from:2,525,813 18. Transferred to: (Express as a negative #)-1,724,709 I hereby certify that the foregoing is true and correct to the best of my knowledge. Revision? Date of Revision: Authorized Name and Digital Signature with Date: Contact Phone:Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60° F. Authority 20 AAC 25.235.Contact Email:Richard.Everett@hilcorp.com MCFAuthorization >1 hr: Conservation:MCF 15. NGL Gas Equivalent 151,686 MCF 16. Purchased gas 0 Waste: Prudhoe Bay, Pt Mcintyre Oil 640180 12. Fuel gas used in lease operations.852,618 AOGCC Use Only 13. Other (see instructions)3,384,389 MCF Safety: Lease Use: 14. TOTAL VOLUME (ITEMS 6-13)12,411,418 11. Assist Gas 107,293 10. Pilot and Purge 12,352 Prudhoe Bay, N Prudhoe Bay 640152 Prudhoe Bay, Raven Oil 640147 9. Flared or vented more than 1 hour (see instr.)0 Prudhoe Bay, Prudhoe Oil 640150 Prudhoe Bay, W Beach Oil 640186 Prudhoe Bay, Niakuk Oil 640148 8. Flared or vented 1 hour or less 0 Prudhoe Bay, W Bch Tr Un 640187 Prudhoe Bay, Sag Riv Undef 640165 0290000009 PBU - GPMA Hilcorp February-2024 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 151,686 Pool Name Pool Code 7. Reinjected 7,903,080 Prudhoe Bay, Lisburne Oil 640144 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 3. Field 4. Operator 5. Month/Year of Disposition Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate Hilcorp Energy Company ALASKA CONSERVATION ORDER NO. 219 PRUDHOE BAY, PRUDHOE LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Feb-24 VOLUME PLANNED DATE TIME (Mscf)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE Total Flare <= 1 Hour 0 Total Flare > 1 Hour 0 Volume Flared 0 Measured Safety Pilot 1,523 Continuous Assist 13,227 TOTAL FLARED 14,750 Hilcorp Energy Company ALASKA CONSERVATION ORDER NO. 219 PRUDHOE BAY, LISBURNE LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Feb-24 VOLUME PLANNED DATE TIME (MSCF)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE Total Flare <= 1 Hour 0 Total Flare > 1 Hour 0 Volume Flared 0 Measured Safety Pilot 7,646 Continuous Assist 66,404 TOTAL FLARED 74,050 Hilcorp Energy Company ALASKA CONSERVATION ORDER NO. 219 PRUDHOE BAY, POINT MCINTYRE LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Feb-24 VOLUME PLANNED DATE TIME (MSCF)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE Total Flare <= 1 Hour 0 Total Flare > 1 Hour 0 Volume Flared 0 Measured Safety Pilot 3,077 Continuous Assist 26,759 TOTAL FLARED 29,836 Hilcorp Energy Company ALASKA CONSERVATION ORDER NO. 219 PRUDHOE BAY, WEST BEACH LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Feb-24 VOLUME PLANNED DATE TIME (MSCF)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE Total Flare <= 1 Hour 0 Total Flare > 1 Hour 0 Volume Flared 0 Measured Safety Pilot 0 Continuous Assist 0 TOTAL FLARED 0 Hilcorp Energy Company ALASKA CONSERVATION ORDER NO. 219 PRUDHOE BAY, NORTH PRUDHOE BAY LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Feb-24 VOLUME PLANNED DATE TIME (MSCF)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE Total Flare <= 1 Hour 0 Total Flare > 1 Hour 0 Volume Flared 0 Measured Safety Pilot 0 Continuous Assist 0 TOTAL FLARED 0 Hilcorp Energy Company ALASKA CONSERVATION ORDER NO. 219 PRUDHOE BAY, COMBINED NIAKUK LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Feb-24 VOLUME PLANNED DATE TIME (Mscf)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE Total Flare <= 1 Hour 0 Total Flare > 1 Hour 0 Volume Flared 0 Measured Safety Pilot 28 Continuous Assist 243 TOTAL FLARED 271 Hilcorp Energy Company ALASKA CONSERVATION ORDER NO. 219 PRUDHOE BAY, RAVEN LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Feb-24 VOLUME PLANNED DATE TIME (Mscf)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE Total Flare <= 1 Hour 0 Total Flare > 1 Hour 0 Volume Flared 0 Measured Safety Pilot 78 Continuous Assist 660 TOTAL FLARED 738 2. Facility Name PBU LISBURNE PROD (GPMA) Percent 58.3% 0.1% 0.0% 0.3% 12.2% 0.0% 0.0% 0.0% 0.0% 19. Remarks: Pt McIntyre NGLs at CGF gas equivalent = 28,709; Pt McIntyre LPC Rich Gas NGLs at CGF gas equivalent = 4,403 and Lisburne LPC Rich Gas NGLs at CGF gas equivalent = 8,952; Block 18: LPC Rich Gas to CGF = 1,810,948 Form 10-422 Revised 10/2021 Reviewed by: COMMISSIONER Title: Senior Accounting Advisor 713-757-7133 Comm.Comm. Block 13: Lift Gas Off Field; Block 17: MI from Prudhoe = 2,308,065 and Fuel Gas from Prudhoe = 0 17. Transferred from:2,308,065 18. Transferred to: (Express as a negative #)-1,810,948 I hereby certify that the foregoing is true and correct to the best of my knowledge. Revision? Date of Revision: Authorized Name and Digital Signature with Date: Contact Phone:Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60° F. Authority 20 AAC 25.235.Contact Email:Richard.Everett@hilcorp.com MCFAuthorization >1 hr: Conservation:MCF 15. NGL Gas Equivalent 158,334 MCF 16. Purchased gas 0 Waste: Prudhoe Bay, Raven Oil 640147 12. Fuel gas used in lease operations.910,886 AOGCC Use Only 13. Other (see instructions)3,798,712 MCF Safety: Lease Use: 14. TOTAL VOLUME (ITEMS 6-13)13,106,260 11. Assist Gas 109,504 10. Pilot and Purge 12,811 Prudhoe Bay, N Prudhoe Bay 640152 BROOKIAN UND OIL 640132 9. Flared or vented more than 1 hour (see instr.)0 Prudhoe Bay, Prudhoe Oil 640150 Prudhoe Bay, W Beach Oil 640186 Prudhoe Bay, Niakuk Oil 640148 8. Flared or vented 1 hour or less 0 Prudhoe Bay, W Bch Tr Un 640187 Prudhoe Bay, Sag Riv Undef 640165 0290000009 PBU - GPMA Hilcorp March-2024 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 158,334 Pool Name Pool Code 7. Reinjected 8,116,013 Prudhoe Bay, Lisburne Oil 640144 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 3. Field 4. Operator 5. Month/Year of Disposition Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate Hilcorp Energy Company ALASKA CONSERVATION ORDER NO. 219 PRUDHOE BAY, PRUDHOE LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Mar-24 VOLUME PLANNED DATE TIME (Mscf)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE Total Flare <= 1 Hour 0 Total Flare > 1 Hour 0 Volume Flared 0 Measured Safety Pilot 1,569 Continuous Assist 13,406 TOTAL FLARED 14,975 Hilcorp Energy Company ALASKA CONSERVATION ORDER NO. 219 PRUDHOE BAY, LISBURNE LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Mar-24 VOLUME PLANNED DATE TIME (MSCF)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE Total Flare <= 1 Hour 0 Total Flare > 1 Hour 0 Volume Flared 0 Measured Safety Pilot 7,466 Continuous Assist 63,691 TOTAL FLARED 71,157 Hilcorp Energy Company ALASKA CONSERVATION ORDER NO. 219 PRUDHOE BAY, POINT MCINTYRE LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Mar-24 VOLUME PLANNED DATE TIME (MSCF)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE Total Flare <= 1 Hour 0 Total Flare > 1 Hour 0 Volume Flared 0 Measured Safety Pilot 3,718 Continuous Assist 31,914 TOTAL FLARED 35,632 Hilcorp Energy Company ALASKA CONSERVATION ORDER NO. 219 PRUDHOE BAY, WEST BEACH LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Mar-24 VOLUME PLANNED DATE TIME (MSCF)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE Total Flare <= 1 Hour 0 Total Flare > 1 Hour 0 Volume Flared 0 Measured Safety Pilot 0 Continuous Assist 0 TOTAL FLARED 0 Hilcorp Energy Company ALASKA CONSERVATION ORDER NO. 219 PRUDHOE BAY, NORTH PRUDHOE BAY LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Mar-24 VOLUME PLANNED DATE TIME (MSCF)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE Total Flare <= 1 Hour 0 Total Flare > 1 Hour 0 Volume Flared 0 Measured Safety Pilot 0 Continuous Assist 0 TOTAL FLARED 0 Hilcorp Energy Company ALASKA CONSERVATION ORDER NO. 219 PRUDHOE BAY, COMBINED NIAKUK LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Mar-24 VOLUME PLANNED DATE TIME (Mscf)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE Total Flare <= 1 Hour 0 Total Flare > 1 Hour 0 Volume Flared 0 Measured Safety Pilot 13 Continuous Assist 109 TOTAL FLARED 122 Hilcorp Energy Company ALASKA CONSERVATION ORDER NO. 219 PRUDHOE BAY, RAVEN LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Mar-24 VOLUME PLANNED DATE TIME (Mscf)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE Total Flare <= 1 Hour 0 Total Flare > 1 Hour 0 Volume Flared 0 Measured Safety Pilot 45 Continuous Assist 384 TOTAL FLARED 429 2. Facility Name PBU LISBURNE PROD (GPMA) Percent 56.4% 0.1% 0.0% 0.4% 12.4% 0.0% 0.0% 0.0% 0.0% 19. Remarks: Pt McIntyre NGLs at CGF gas equivalent = 28,277; Pt McIntyre LPC Rich Gas NGLs at CGF gas equivalent = 2,928 and Lisburne LPC Rich Gas NGLs at CGF gas equivalent = 5,435; Block 18: LPC Rich Gas to CGF = 1,251,928 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 3. Field 4. Operator 5. Month/Year of Disposition 0290000009 PBU - GPMA Hilcorp April-2024 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 140,019 Pool Name Pool Code 7. Reinjected 8,025,010 Prudhoe Bay, Lisburne Oil 640144 Prudhoe Bay, Niakuk Oil 640148 8. Flared or vented 1 hour or less 16 Prudhoe Bay, W Bch Tr Un 640187 Prudhoe Bay, Sag Riv Undef 640165 9. Flared or vented more than 1 hour (see instr.)0 Prudhoe Bay, Prudhoe Oil 640150 Prudhoe Bay, W Beach Oil 640186 10. Pilot and Purge 12,036 Prudhoe Bay, N Prudhoe Bay 640152 BROOKIAN UND OIL 640132 Prudhoe Bay, Raven Oil 640147 12. Fuel gas used in lease operations.835,050 AOGCC Use Only 13. Other (see instructions)3,449,871 MCF Safety: Lease Use: 14. TOTAL VOLUME (ITEMS 6-13)12,582,259 11. Assist Gas 120,257 MCFAuthorization >1 hr: Conservation:MCF 15. NGL Gas Equivalent 140,019 MCF 16. Purchased gas 0 Waste: Contact Phone:Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60° F. Authority 20 AAC 25.235.Contact Email:Richard.Everett@hilcorp.com Form 10-422 Revised 10/2021 Reviewed by: COMMISSIONER Title: Senior Accounting Advisor 713-757-7133 Comm.Comm. Block 13: Lift Gas Off Field; Block 17: MI from Prudhoe = 2,155,294 and Fuel Gas from Prudhoe = 0 17. Transferred from:2,155,294 18. Transferred to: (Express as a negative #)-1,251,928 I hereby certify that the foregoing is true and correct to the best of my knowledge. Revision? Date of Revision: Authorized Name and Digital Signature with Date: Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate Hilcorp Energy Company ALASKA CONSERVATION ORDER NO. 219 PRUDHOE BAY, PRUDHOE LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Apr-24 VOLUME PLANNED DATE TIME (Mscf)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 4/2/2024 16:43-16:44 1 U 4/23/2024 8:29-8:30 1 U Total Flare <= 1 Hour 2 Total Flare > 1 Hour 0 Volume Flared 2 Measured Safety Pilot 1,490 Continuous Assist 14,843 TOTAL FLARED 16,335 Hilcorp Energy Company ALASKA CONSERVATION ORDER NO. 219 PRUDHOE BAY, LISBURNE LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Apr-24 VOLUME PLANNED DATE TIME (MSCF)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 4/2/2024 16:43-16:44 6 U 4/23/2024 8:29-8:30 2 U Total Flare <= 1 Hour 8 Total Flare > 1 Hour 0 Volume Flared 8 Measured Safety Pilot 6,782 Continuous Assist 67,884 TOTAL FLARED 74,674 Hilcorp Energy Company ALASKA CONSERVATION ORDER NO. 219 PRUDHOE BAY, POINT MCINTYRE LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Apr-24 VOLUME PLANNED DATE TIME (MSCF)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 4/2/2024 16:43-16:44 5 U 4/23/2024 8:29-8:30 1 U Total Flare <= 1 Hour 6 Total Flare > 1 Hour 0 Volume Flared 6 Measured Safety Pilot 3,708 Continuous Assist 36,978 TOTAL FLARED 40,692 Hilcorp Energy Company ALASKA CONSERVATION ORDER NO. 219 PRUDHOE BAY, WEST BEACH LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Apr-24 VOLUME PLANNED DATE TIME (MSCF)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 4/2/2024 16:43-16:44 0 U 4/23/2024 8:29-8:30 0 U Total Flare <= 1 Hour 0 Total Flare > 1 Hour 0 Volume Flared 0 Measured Safety Pilot 0 Continuous Assist 0 TOTAL FLARED 0 Hilcorp Energy Company ALASKA CONSERVATION ORDER NO. 219 PRUDHOE BAY, NORTH PRUDHOE BAY LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Apr-24 VOLUME PLANNED DATE TIME (MSCF)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 4/2/2024 16:43-16:44 0 U 4/23/2024 8:29-8:30 0 U Total Flare <= 1 Hour 0 Total Flare > 1 Hour 0 Volume Flared 0 Measured Safety Pilot 0 Continuous Assist 0 TOTAL FLARED 0 Hilcorp Energy Company ALASKA CONSERVATION ORDER NO. 219 PRUDHOE BAY, COMBINED NIAKUK LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Apr-24 VOLUME PLANNED DATE TIME (Mscf)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 4/2/2024 16:43-16:44 0 U 4/23/2024 8:29-8:30 0 U Total Flare <= 1 Hour 0 Total Flare > 1 Hour 0 Volume Flared 0 Measured Safety Pilot 9 Continuous Assist 91 TOTAL FLARED 100 Hilcorp Energy Company ALASKA CONSERVATION ORDER NO. 219 PRUDHOE BAY, RAVEN LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Apr-24 VOLUME PLANNED DATE TIME (Mscf)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 4/2/2024 16:43-16:44 0 U 4/23/2024 8:29-8:30 0 U Total Flare <= 1 Hour 0 Total Flare > 1 Hour 0 Volume Flared 0 Measured Safety Pilot 47 Continuous Assist 461 TOTAL FLARED 508 2. Facility Name PBU LISBURNE PROD (GPMA) Percent 59.1% 0.2% 0.0% 0.4% 9.9% 0.0% 0.3% 0.0% 0.0% 0.1% 30.1% 19. Remarks: Pt McIntyre NGLs at CGF gas equivalent = 28,648; Pt McIntyre LPC Rich Gas NGLs at CGF gas equivalent = 2,497 and Lisburne LPC Rich Gas NGLs at CGF gas equivalent = 5,541; Block 18: LPC Rich Gas to CGF = 1,252,300 Prudhoe Bay, Raven Oil 640147 Prudhoe Bay, Pt Mcintyre Oil 640180 11. Assist Gas 130,429 Form 10-422 Revised 10/2021 Reviewed by: COMMISSIONER Title: Senior Accounting Advisor 713-757-7133 Comm.Comm. Block 13: Lift Gas Off Field; Block 17: MI from Prudhoe = 1,819,826 and Fuel Gas from Prudhoe = 0 17. Transferred from:1,819,826 18. Transferred to: (Express as a negative #)-1,252,300 I hereby certify that the foregoing is true and correct to the best of my knowledge. Revision? Date of Revision: Authorized Name and Digital Signature with Date: Contact Phone:Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60° F. Authority 20 AAC 25.235.Contact Email:Richard.Everett@hilcorp.com MCFAuthorization >1 hr: Conservation:MCF 15. NGL Gas Equivalent 136,589 MCF 16. Purchased gas 0 Waste: BROOKIAN UND OIL 640132 12. Fuel gas used in lease operations.791,889 AOGCC Use Only 13. Other (see instructions)3,891,053 MCF Safety: Lease Use: 14. TOTAL VOLUME (ITEMS 6-13)12,180,656 10. Pilot and Purge 12,384 Prudhoe Bay, Pt M Stump Is Oil 640183 Prudhoe Bay, N Prudhoe Bay Oil 640152 9. Flared or vented more than 1 hour (see instr.)0 Prudhoe Bay, Prudhoe Oil 640150 Prudhoe Bay, W Beach Oil 640186 Prudhoe Bay, Niakuk Oil 640148 8. Flared or vented 1 hour or less 513 Prudhoe Bay, W Bch Tr Un WTRSP 640187 Prudhoe Bay, Sag Riv Undef Oil 640165 0290000009 PBU - GPMA Hilcorp May-2024 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 136,589 Pool Name Pool Code 7. Reinjected 7,217,799 Prudhoe Bay, Lisburne Oil 640144 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 3. Field 4. Operator 5. Month/Year of Disposition Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate Hilcorp Energy Company ALASKA CONSERVATION ORDER NO. 219 PRUDHOE BAY, PRUDHOE LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS May-24 VOLUME PLANNED DATE TIME (Mscf)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 5/4/2024 6:39-7:37 36 P 5/4/2024 19:43-19:47 38 P 5/5/2024 5:27-5:28 0 P Total Flare <= 1 Hour 74 Total Flare > 1 Hour 0 Volume Flared 74 Measured Safety Pilot 1,192 Continuous Assist 12,928 TOTAL FLARED 14,194 Hilcorp Energy Company ALASKA CONSERVATION ORDER NO. 219 PRUDHOE BAY, LISBURNE LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS May-24 VOLUME PLANNED DATE TIME (MSCF)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 5/4/2024 6:39-7:37 149 P 5/4/2024 19:43-19:47 153 P 5/5/2024 5:27-5:28 5 P Total Flare <= 1 Hour 307 Total Flare > 1 Hour 0 Volume Flared 307 Measured Safety Pilot 7,232 Continuous Assist 76,721 TOTAL FLARED 84,260 Hilcorp Energy Company ALASKA CONSERVATION ORDER NO. 219 PRUDHOE BAY, POINT MCINTYRE LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS May-24 VOLUME PLANNED DATE TIME (MSCF)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 5/4/2024 6:39-7:37 60 P 5/4/2024 19:43-19:47 61 P 5/5/2024 5:27-5:28 11 P Total Flare <= 1 Hour 132 Total Flare > 1 Hour 0 Volume Flared 132 Measured Safety Pilot 3,892 Continuous Assist 40,065 TOTAL FLARED 44,089 Hilcorp Energy Company ALASKA CONSERVATION ORDER NO. 219 PRUDHOE BAY, WEST BEACH LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS May-24 VOLUME PLANNED DATE TIME (MSCF)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 5/4/2024 6:39-7:37 0 P 5/4/2024 19:43-19:47 0 P 5/5/2024 5:27-5:28 0 P Total Flare <= 1 Hour 0 Total Flare > 1 Hour 0 Volume Flared 0 Measured Safety Pilot 0 Continuous Assist 0 TOTAL FLARED 0 Hilcorp Energy Company ALASKA CONSERVATION ORDER NO. 219 PRUDHOE BAY, NORTH PRUDHOE BAY LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS May-24 VOLUME PLANNED DATE TIME (MSCF)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 5/4/2024 6:39-7:37 0 P 5/4/2024 19:43-19:47 0 P 5/5/2024 5:27-5:28 0 P Total Flare <= 1 Hour 0 Total Flare > 1 Hour 0 Volume Flared 0 Measured Safety Pilot 0 Continuous Assist 0 TOTAL FLARED 0 Hilcorp Energy Company ALASKA CONSERVATION ORDER NO. 219 PRUDHOE BAY, COMBINED NIAKUK LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS May-24 VOLUME PLANNED DATE TIME (Mscf)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 5/4/2024 6:39-7:37 0 P 5/4/2024 19:43-19:47 0 P 5/5/2024 5:27-5:28 0 P Total Flare <= 1 Hour 0 Total Flare > 1 Hour 0 Volume Flared 0 Measured Safety Pilot 17 Continuous Assist 185 TOTAL FLARED 202 Hilcorp Energy Company ALASKA CONSERVATION ORDER NO. 219 PRUDHOE BAY, RAVEN LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS May-24 VOLUME PLANNED DATE TIME (Mscf)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 5/4/2024 6:39-7:37 0 P 5/4/2024 19:43-19:47 0 P 5/5/2024 5:27-5:28 0 P Total Flare <= 1 Hour 0 Total Flare > 1 Hour 0 Volume Flared 0 Measured Safety Pilot 51 Continuous Assist 530 TOTAL FLARED 581 2. Facility Name PBU LISBURNE PROD (GPMA) Percent 52.0% 0.2% 0.0% 0.4% 11.8% 0.0% 0.2% 0.0% 0.0% 19. Remarks: Pt McIntyre NGLs at CGF gas equivalent = 26,142; Pt McIntyre LPC Rich Gas NGLs at CGF gas equivalent = 3,923 and Lisburne LPC Rich Gas NGLs at CGF gas equivalent = 5,785; Block 18: LPC Rich Gas to CGF = 1,486,436 Form 10-422 Revised 10/2021 Reviewed by: COMMISSIONER Title: Senior Accounting Advisor 713-757-7133 Comm.Comm. Block 13: Lift Gas Off Field; Block 17: MI from Prudhoe = 1,809,427 and Fuel Gas from Prudhoe = 0 17. Transferred from:1,809,427 18. Transferred to: (Express as a negative #)-1,486,436 I hereby certify that the foregoing is true and correct to the best of my knowledge. Revision? Date of Revision: Authorized Name and Digital Signature with Date: Contact Phone:Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60° F. Authority 20 AAC 25.235.Contact Email:Richard.Everett@hilcorp.com MCFAuthorization >1 hr: Conservation:MCF 15. NGL Gas Equivalent 139,550 MCF 16. Purchased gas 0 Waste: BROOKIAN UND OIL 640132 12. Fuel gas used in lease operations.780,191 AOGCC Use Only 13. Other (see instructions)3,573,693 MCF Safety: Lease Use: 14. TOTAL VOLUME (ITEMS 6-13)11,657,012 11. Assist Gas 136,009 10. Pilot and Purge 11,959 Prudhoe Bay, Pt M Stump Is 640183 Prudhoe Bay, N Prudhoe Bay 640152 9. Flared or vented more than 1 hour (see instr.)0 Prudhoe Bay, Prudhoe Oil 640150 Prudhoe Bay, W Beach Oil 640186 Prudhoe Bay, Niakuk Oil 640148 8. Flared or vented 1 hour or less 2 Prudhoe Bay, W Bch Tr Un 640187 Prudhoe Bay, Sag Riv Undef 640165 0290000009 PBU - GPMA Hilcorp June-2024 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 139,550 Pool Name Pool Code 7. Reinjected 7,015,608 Prudhoe Bay, Lisburne Oil 640144 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 3. Field 4. Operator 5. Month/Year of Disposition Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate Hilcorp Energy Company ALASKA CONSERVATION ORDER NO. 219 PRUDHOE BAY, PRUDHOE LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Jun-24 VOLUME PLANNED DATE TIME (Mscf)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 6/24/2024 10:10-10:25 0 U 6/24/2024 13:15-13:17 0 U Total Flare <= 1 Hour 0 Total Flare > 1 Hour 0 Volume Flared 0 Measured Safety Pilot 1,421 Continuous Assist 16,059 TOTAL FLARED 17,480 Hilcorp Energy Company ALASKA CONSERVATION ORDER NO. 219 PRUDHOE BAY, LISBURNE LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Jun-24 VOLUME PLANNED DATE TIME (MSCF)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 6/24/2024 10:10-10:25 0 U 6/24/2024 13:15-13:17 0 U Total Flare <= 1 Hour 0 Total Flare > 1 Hour 0 Volume Flared 0 Measured Safety Pilot 6,206 Continuous Assist 70,780 TOTAL FLARED 76,986 Hilcorp Energy Company ALASKA CONSERVATION ORDER NO. 219 PRUDHOE BAY, POINT MCINTYRE LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Jun-24 VOLUME PLANNED DATE TIME (MSCF)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 6/24/2024 10:10-10:25 0 U 6/24/2024 13:15-13:17 0 U Total Flare <= 1 Hour 0 Total Flare > 1 Hour 0 Volume Flared 0 Measured Safety Pilot 4,256 Continuous Assist 48,298 TOTAL FLARED 52,554 Hilcorp Energy Company ALASKA CONSERVATION ORDER NO. 219 PRUDHOE BAY, WEST BEACH LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Jun-24 VOLUME PLANNED DATE TIME (MSCF)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 6/24/2024 10:10-10:25 0 U 6/24/2024 13:15-13:17 0 U Total Flare <= 1 Hour 0 Total Flare > 1 Hour 0 Volume Flared 0 Measured Safety Pilot 0 Continuous Assist 0 TOTAL FLARED 0 Hilcorp Energy Company ALASKA CONSERVATION ORDER NO. 219 PRUDHOE BAY, NORTH PRUDHOE BAY LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Jun-24 VOLUME PLANNED DATE TIME (MSCF)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 6/24/2024 10:10-10:25 0 U 6/24/2024 13:15-13:17 0 U Total Flare <= 1 Hour 0 Total Flare > 1 Hour 0 Volume Flared 0 Measured Safety Pilot 0 Continuous Assist 0 TOTAL FLARED 0 Hilcorp Energy Company ALASKA CONSERVATION ORDER NO. 219 PRUDHOE BAY, COMBINED NIAKUK LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Jun-24 VOLUME PLANNED DATE TIME (Mscf)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 6/24/2024 10:10-10:25 0 U 6/24/2024 13:15-13:17 0 U Total Flare <= 1 Hour 0 Total Flare > 1 Hour 0 Volume Flared 0 Measured Safety Pilot 27 Continuous Assist 312 TOTAL FLARED 339 Hilcorp Energy Company ALASKA CONSERVATION ORDER NO. 219 PRUDHOE BAY, RAVEN LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Jun-24 VOLUME PLANNED DATE TIME (Mscf)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 6/24/2024 10:10-10:25 0 U 6/24/2024 13:15-13:17 0 U Total Flare <= 1 Hour 0 Total Flare > 1 Hour 0 Volume Flared 0 Measured Safety Pilot 49 Continuous Assist 560 TOTAL FLARED 609 2. Facility Name PBU LISBURNE PROD (GPMA) Percent 53.4% 0.3% 0.0% 0.4% 12.2% 0.0% 0.8% 0.0% 0.0% 19. Remarks: Pt McIntyre NGLs at CGF gas equivalent = 25,448; Pt McIntyre LPC Rich Gas NGLs at CGF gas equivalent = 4,429 and Lisburne LPC Rich Gas NGLs at CGF gas equivalent = 7,101; Block 18: LPC Rich Gas to CGF = 1,803,820 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 3. Field 4. Operator 5. Month/Year of Disposition 0290000009 PBU - GPMA Hilcorp July-2024 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 134,804 Pool Name Pool Code 7. Reinjected 6,780,936 Prudhoe Bay, Lisburne Oil 640144 Prudhoe Bay, Niakuk Oil 640148 8. Flared or vented 1 hour or less 191 Prudhoe Bay, W Bch Tr Un 640187 Prudhoe Bay, Sag Riv Undef 640165 9. Flared or vented more than 1 hour (see instr.)0 Prudhoe Bay, Prudhoe Oil 640150 Prudhoe Bay, W Beach Oil 640186 10. Pilot and Purge 12,079 Prudhoe Bay, Pt M Stump Is 640183 Prudhoe Bay, N Prudhoe Bay 640152 BROOKIAN UND OIL 640132 12. Fuel gas used in lease operations.819,406 AOGCC Use Only 13. Other (see instructions)3,432,512 MCF Safety: Lease Use: 14. TOTAL VOLUME (ITEMS 6-13)11,308,120 11. Assist Gas 128,192 MCFAuthorization >1 hr: Conservation:MCF 15. NGL Gas Equivalent 134,804 MCF 16. Purchased gas 0 Waste: Contact Phone:Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60° F. Authority 20 AAC 25.235.Contact Email:Richard.Everett@hilcorp.com Form 10-422 Revised 10/2021 Reviewed by: COMMISSIONER Title: Senior Accounting Advisor 713-757-7133 Comm.Comm. Block 13: Lift Gas Off Field; Block 17: MI from Prudhoe = 1,821,282 and Fuel Gas from Prudhoe = 0 17. Transferred from:1,821,282 18. Transferred to: (Express as a negative #)-1,803,820 I hereby certify that the foregoing is true and correct to the best of my knowledge. Revision? Date of Revision: Authorized Name and Digital Signature with Date: Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate Hilcorp Energy Company ALASKA CONSERVATION ORDER NO. 219 PRUDHOE BAY, PRUDHOE LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Jul-24 VOLUME PLANNED DATE TIME (Mscf)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 7/11/2024 07:35-07:49 11 U 7/19/2024 14:37-15:06 13 U 7/24/2024 00:56-00:57 0 U Total Flare <= 1 Hour 24 Total Flare > 1 Hour 0 Volume Flared 24 Measured Safety Pilot 1,479 Continuous Assist 15,685 TOTAL FLARED 17,188 Hilcorp Energy Company ALASKA CONSERVATION ORDER NO. 219 PRUDHOE BAY, LISBURNE LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Jul-24 VOLUME PLANNED DATE TIME (MSCF)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 7/11/2024 07:35-07:49 52 U 7/19/2024 14:37-15:06 49 U 7/24/2024 00:56-00:57 2 U Total Flare <= 1 Hour 103 Total Flare > 1 Hour 0 Volume Flared 103 Measured Safety Pilot 6,468 Continuous Assist 67,979 TOTAL FLARED 74,550 Hilcorp Energy Company ALASKA CONSERVATION ORDER NO. 219 PRUDHOE BAY, POINT MCINTYRE LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Jul-24 VOLUME PLANNED DATE TIME (MSCF)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 7/11/2024 07:35-07:49 29 U 7/19/2024 14:37-15:06 34 U 7/24/2024 00:56-00:57 1 U Total Flare <= 1 Hour 64 Total Flare > 1 Hour 0 Volume Flared 64 Measured Safety Pilot 4,044 Continuous Assist 43,604 TOTAL FLARED 47,712 Hilcorp Energy Company ALASKA CONSERVATION ORDER NO. 219 PRUDHOE BAY, WEST BEACH LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Jul-24 VOLUME PLANNED DATE TIME (MSCF)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 7/11/2024 07:35-07:49 0 U 7/19/2024 14:37-15:06 0 U 7/24/2024 00:56-00:57 0 U Total Flare <= 1 Hour 0 Total Flare > 1 Hour 0 Volume Flared 0 Measured Safety Pilot 0 Continuous Assist 0 TOTAL FLARED 0 Hilcorp Energy Company ALASKA CONSERVATION ORDER NO. 219 PRUDHOE BAY, NORTH PRUDHOE BAY LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Jul-24 VOLUME PLANNED DATE TIME (MSCF)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 7/11/2024 07:35-07:49 0 U 7/19/2024 14:37-15:06 0 U 7/24/2024 00:56-00:57 0 U Total Flare <= 1 Hour 0 Total Flare > 1 Hour 0 Volume Flared 0 Measured Safety Pilot 0 Continuous Assist 0 TOTAL FLARED 0 Hilcorp Energy Company ALASKA CONSERVATION ORDER NO. 219 PRUDHOE BAY, COMBINED NIAKUK LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Jul-24 VOLUME PLANNED DATE TIME (Mscf)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 7/11/2024 07:35-07:49 0 U 7/19/2024 14:37-15:06 0 U 7/24/2024 00:56-00:57 0 U Total Flare <= 1 Hour 0 Total Flare > 1 Hour 0 Volume Flared 0 Measured Safety Pilot 37 Continuous Assist 378 TOTAL FLARED 415 Hilcorp Energy Company ALASKA CONSERVATION ORDER NO. 219 PRUDHOE BAY, RAVEN LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Jul-24 VOLUME PLANNED DATE TIME (Mscf)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 7/11/2024 07:35-07:49 0 U 7/19/2024 14:37-15:06 0 U 7/24/2024 00:56-00:57 0 U Total Flare <= 1 Hour 0 Total Flare > 1 Hour 0 Volume Flared 0 Measured Safety Pilot 51 Continuous Assist 546 TOTAL FLARED 597 2. Facility Name PBU LISBURNE PROD (GPMA) Percent 53.3% 0.1% 0.0% 0.4% 11.8% 0.0% 0.4% 0.0% 0.0% 19. Remarks: Pt McIntyre NGLs at CGF gas equivalent = 20,890; Pt McIntyre LPC Rich Gas NGLs at CGF gas equivalent = 4,129 and Lisburne LPC Rich Gas NGLs at CGF gas equivalent = 6,529; Block 18: LPC Rich Gas to CGF = 1,729,546 Form 10-422 Revised 10/2021 Reviewed by: COMMISSIONER Title: Senior Accounting Advisor 713-757-7133 Comm.Comm. Block 13: Lift Gas Off Field; Block 17: MI from Prudhoe = 1,418,129 and Fuel Gas from Prudhoe = 0 17. Transferred from:1,418,129 18. Transferred to: (Express as a negative #)-1,729,546 I hereby certify that the foregoing is true and correct to the best of my knowledge. Revision? Date of Revision: Authorized Name and Digital Signature with Date: Contact Phone:Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60° F. Authority 20 AAC 25.235.Contact Email:Richard.Everett@hilcorp.com MCFAuthorization >1 hr: Conservation:MCF 15. NGL Gas Equivalent 120,680 MCF 16. Purchased gas 0 Waste: BROOKIAN UND OIL 640132 12. Fuel gas used in lease operations.820,082 AOGCC Use Only 13. Other (see instructions)3,460,515 MCF Safety: Lease Use: 14. TOTAL VOLUME (ITEMS 6-13)11,248,073 11. Assist Gas 118,477 10. Pilot and Purge 12,448 Prudhoe Bay, Pt M Stump Is 640183 Prudhoe Bay, N Prudhoe Bay 640152 9. Flared or vented more than 1 hour (see instr.)0 Prudhoe Bay, Prudhoe Oil 640150 Prudhoe Bay, W Beach Oil 640186 Prudhoe Bay, Niakuk Oil 640148 8. Flared or vented 1 hour or less 214 Prudhoe Bay, W Bch Tr Un 640187 Prudhoe Bay, Sag Riv Undef 640165 0290000009 PBU - GPMA Hilcorp August-2024 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 120,680 Pool Name Pool Code 7. Reinjected 6,715,657 Prudhoe Bay, Lisburne Oil 640144 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 3. Field 4. Operator 5. Month/Year of Disposition Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate Hilcorp Energy Company ALASKA CONSERVATION ORDER NO. 219 PRUDHOE BAY, PRUDHOE LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Aug-24 VOLUME PLANNED DATE TIME (Mscf)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 8/10/2024 14:01-14:33 24 U Total Flare <= 1 Hour 24 Total Flare > 1 Hour 0 Volume Flared 24 Measured Safety Pilot 1,467 Continuous Assist 14,006 TOTAL FLARED 15,497 Hilcorp Energy Company ALASKA CONSERVATION ORDER NO. 219 PRUDHOE BAY, LISBURNE LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Aug-24 VOLUME PLANNED DATE TIME (MSCF)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 8/10/2024 14:01-14:33 116 U Total Flare <= 1 Hour 116 Total Flare > 1 Hour 0 Volume Flared 116 Measured Safety Pilot 6,639 Continuous Assist 63,141 TOTAL FLARED 69,896 Hilcorp Energy Company ALASKA CONSERVATION ORDER NO. 219 PRUDHOE BAY, POINT MCINTYRE LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Aug-24 VOLUME PLANNED DATE TIME (MSCF)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 8/10/2024 14:01-14:33 72 U Total Flare <= 1 Hour 72 Total Flare > 1 Hour 0 Volume Flared 72 Measured Safety Pilot 4,200 Continuous Assist 39,843 TOTAL FLARED 44,115 Hilcorp Energy Company ALASKA CONSERVATION ORDER NO. 219 PRUDHOE BAY, WEST BEACH LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Aug-24 VOLUME PLANNED DATE TIME (MSCF)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 8/10/2024 14:01-14:33 0 U Total Flare <= 1 Hour 0 Total Flare > 1 Hour 0 Volume Flared 0 Measured Safety Pilot 0 Continuous Assist 0 TOTAL FLARED 0 Hilcorp Energy Company ALASKA CONSERVATION ORDER NO. 219 PRUDHOE BAY, NORTH PRUDHOE BAY LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Aug-24 VOLUME PLANNED DATE TIME (MSCF)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 8/10/2024 14:01-14:33 0 U Total Flare <= 1 Hour 0 Total Flare > 1 Hour 0 Volume Flared 0 Measured Safety Pilot 0 Continuous Assist 0 TOTAL FLARED 0 Hilcorp Energy Company ALASKA CONSERVATION ORDER NO. 219 PRUDHOE BAY, COMBINED NIAKUK LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Aug-24 VOLUME PLANNED DATE TIME (Mscf)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 8/10/2024 14:01-14:33 1 U Total Flare <= 1 Hour 1 Total Flare > 1 Hour 0 Volume Flared 1 Measured Safety Pilot 14 Continuous Assist 147 TOTAL FLARED 162 Hilcorp Energy Company ALASKA CONSERVATION ORDER NO. 219 PRUDHOE BAY, RAVEN LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Aug-24 VOLUME PLANNED DATE TIME (Mscf)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 8/10/2024 14:01-14:33 1 U Total Flare <= 1 Hour 1 Total Flare > 1 Hour 0 Volume Flared 1 Measured Safety Pilot 128 Continuous Assist 1,340 TOTAL FLARED 1,469 2. Facility Name PBU LISBURNE PROD (GPMA) Percent 53.6% 0.0% 0.0% 0.3% 11.0% 0.0% 0.7% 0.0% 0.0% 19. Remarks: Pt McIntyre NGLs at CGF gas equivalent = 24,017; Pt McIntyre LPC Rich Gas NGLs at CGF gas equivalent = 3,770 and Lisburne LPC Rich Gas NGLs at CGF gas equivalent =5,756; Block 18: LPC Rich Gas to CGF = 1,659,075 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 3. Field 4. Operator 5. Month/Year of Disposition 0290000009 PBU - GPMA Hilcorp September-2024 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 127,400 Pool Name Pool Code 7. Reinjected 6,938,532 Prudhoe Bay, Lisburne Oil 640144 Prudhoe Bay, Niakuk Oil 640148 8. Flared or vented 1 hour or less 6,391 Prudhoe Bay, W Bch Tr Un 640187 Prudhoe Bay, Sag Riv Undef 640165 9. Flared or vented more than 1 hour (see instr.)0 Prudhoe Bay, Prudhoe Oil 640150 Prudhoe Bay, W Beach Oil 640186 10. Pilot and Purge 12,228 Prudhoe Bay, Pt M Stump Is 640183 Prudhoe Bay, N Prudhoe Bay 640152 BROOKIAN UND OIL 640132 12. Fuel gas used in lease operations.798,187 AOGCC Use Only 13. Other (see instructions)3,405,745 MCF Safety: Lease Use: 14. TOTAL VOLUME (ITEMS 6-13)11,428,158 11. Assist Gas 139,675 MCFAuthorization >1 hr: Conservation:MCF 15. NGL Gas Equivalent 127,400 MCF 16. Purchased gas 0 Waste: Contact Phone:Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60° F. Authority 20 AAC 25.235.Contact Email:Richard.Everett@hilcorp.com Form 10-422 Revised 10/2021 Reviewed by: COMMISSIONER Title: Senior Accounting Advisor 713-757-7133 Comm.Comm. Block 13: Lift Gas Off Field; Block 17: MI from Prudhoe = 1,904,263 and Fuel Gas from Prudhoe = 0 17. Transferred from:1,904,263 18. Transferred to: (Express as a negative #)-1,659,075 I hereby certify that the foregoing is true and correct to the best of my knowledge. Revision? Date of Revision: Authorized Name and Digital Signature with Date: Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate Hilcorp Energy Company ALASKA CONSERVATION ORDER NO. 219 PRUDHOE BAY, PRUDHOE LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Sep-24 VOLUME PLANNED DATE TIME (Mscf)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 9/23/2024 07:35-08:14 506 U 9/23/2024 11:18-11:19 1 U 9/23/2024 17:10-17:13 23 U 9/23/2024 18:52-18:53 9 U 9/24/2024 8:28-8:44 133 U 9/24/2024 14:02-14:07 22 U 9/24/2024 14:38-14:41 25 U 9/24/2024 15:31-15:32 9 U 9/24/2024 15:58-15:59 26 U 9/24/2024 17:11-17:13 30 U 9/24/2024 22:08-22:09 5 U 9/24/2024 23:34-23:35 1 U Total Flare <= 1 Hour 790 Total Flare > 1 Hour 0 Volume Flared 790 Measured Safety Pilot 1,351 Continuous Assist 15,468 TOTAL FLARED 17,609 Hilcorp Energy Company ALASKA CONSERVATION ORDER NO. 219 PRUDHOE BAY, LISBURNE LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Sep-24 VOLUME PLANNED DATE TIME (MSCF)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 9/23/2024 07:35-08:14 2,184 U 9/23/2024 11:18-11:19 6 U 9/23/2024 17:10-17:13 97 U 9/23/2024 18:52-18:53 39 U 9/24/2024 8:28-8:44 572 U 9/24/2024 14:02-14:07 95 U 9/24/2024 14:38-14:41 107 U 9/24/2024 15:31-15:32 38 U 9/24/2024 15:58-15:59 110 U 9/24/2024 17:11-17:13 134 U 9/24/2024 22:08-22:09 21 U 9/24/2024 23:34-23:35 6 U Total Flare <= 1 Hour 3,409 Total Flare > 1 Hour 0 Volume Flared 3,409 Measured Safety Pilot 6,545 Continuous Assist 74,819 TOTAL FLARED 84,773 Hilcorp Energy Company ALASKA CONSERVATION ORDER NO. 219 PRUDHOE BAY, POINT MCINTYRE LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Sep-24 VOLUME PLANNED DATE TIME (MSCF)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 9/23/2024 07:35-08:14 1,381 U 9/23/2024 11:18-11:19 4 U 9/23/2024 17:10-17:13 61 U 9/23/2024 18:52-18:53 25 U 9/24/2024 8:28-8:44 362 U 9/24/2024 14:02-14:07 60 U 9/24/2024 14:38-14:41 67 U 9/24/2024 15:31-15:32 24 U 9/24/2024 15:58-15:59 70 U 9/24/2024 17:11-17:13 85 U 9/24/2024 22:08-22:09 13 U 9/24/2024 23:34-23:35 4 U Total Flare <= 1 Hour 2,156 Total Flare > 1 Hour 0 Volume Flared 2,156 Measured Safety Pilot 4,288 Continuous Assist 48,888 TOTAL FLARED 55,332 Hilcorp Energy Company ALASKA CONSERVATION ORDER NO. 219 PRUDHOE BAY, WEST BEACH LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Sep-24 VOLUME PLANNED DATE TIME (MSCF)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 9/23/2024 07:35-08:14 0 U 9/23/2024 11:18-11:19 0 U 9/23/2024 17:10-17:13 0 U 9/23/2024 18:52-18:53 0 U 9/24/2024 8:28-8:44 0 U 9/24/2024 14:02-14:07 0 U 9/24/2024 14:38-14:41 0 U 9/24/2024 15:31-15:32 0 U 9/24/2024 15:58-15:59 0 U 9/24/2024 17:11-17:13 0 U 9/24/2024 22:08-22:09 0 U 9/24/2024 23:34-23:35 0 U Total Flare <= 1 Hour 0 Total Flare > 1 Hour 0 Volume Flared 0 Measured Safety Pilot 0 Continuous Assist 0 TOTAL FLARED 0 Hilcorp Energy Company ALASKA CONSERVATION ORDER NO. 219 PRUDHOE BAY, NORTH PRUDHOE BAY LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Sep-24 VOLUME PLANNED DATE TIME (MSCF)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 9/23/2024 07:35-08:14 0 U 9/23/2024 11:18-11:19 0 U 9/23/2024 17:10-17:13 0 U 9/23/2024 18:52-18:53 0 U 9/24/2024 8:28-8:44 0 U 9/24/2024 14:02-14:07 0 U 9/24/2024 14:38-14:41 0 U 9/24/2024 15:31-15:32 0 U 9/24/2024 15:58-15:59 0 U 9/24/2024 17:11-17:13 0 U 9/24/2024 22:08-22:09 0 U 9/24/2024 23:34-23:35 0 U Total Flare <= 1 Hour 0 Total Flare > 1 Hour 0 Volume Flared 0 Measured Safety Pilot 0 Continuous Assist 0 TOTAL FLARED 0 Hilcorp Energy Company ALASKA CONSERVATION ORDER NO. 219 PRUDHOE BAY, COMBINED NIAKUK LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Sep-24 VOLUME PLANNED DATE TIME (Mscf)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 9/23/2024 07:35-08:14 2 U 9/23/2024 11:18-11:19 0 U 9/23/2024 17:10-17:13 0 U 9/23/2024 18:52-18:53 0 U 9/24/2024 8:28-8:44 1 U 9/24/2024 14:02-14:07 0 U 9/24/2024 14:38-14:41 0 U 9/24/2024 15:31-15:32 0 U 9/24/2024 15:58-15:59 0 U 9/24/2024 17:11-17:13 1 U 9/24/2024 22:08-22:09 0 U 9/24/2024 23:34-23:35 0 U Total Flare <= 1 Hour 4 Total Flare > 1 Hour 0 Volume Flared 4 Measured Safety Pilot 3 Continuous Assist 31 TOTAL FLARED 38 Hilcorp Energy Company ALASKA CONSERVATION ORDER NO. 219 PRUDHOE BAY, RAVEN LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Sep-24 VOLUME PLANNED DATE TIME (Mscf)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 9/23/2024 07:35-08:14 21 U 9/23/2024 11:18-11:19 0 U 9/23/2024 17:10-17:13 1 U 9/23/2024 18:52-18:53 0 U 9/24/2024 8:28-8:44 5 U 9/24/2024 14:02-14:07 1 U 9/24/2024 14:38-14:41 1 U 9/24/2024 15:31-15:32 1 U 9/24/2024 15:58-15:59 1 U 9/24/2024 17:11-17:13 1 U 9/24/2024 22:08-22:09 0 U 9/24/2024 23:34-23:35 0 U Total Flare <= 1 Hour 32 Total Flare > 1 Hour 0 Volume Flared 32 Measured Safety Pilot 41 Continuous Assist 469 TOTAL FLARED 542 2. Facility Name PBU LISBURNE PROD (GPMA) Percent 50.9% 0.1% 0.0% 0.3% 10.9% 0.0% 0.6% 0.0% 0.0% 19. Remarks: Pt McIntyre NGLs at CGF gas equivalent = 20,336; Pt McIntyre LPC Rich Gas NGLs at CGF gas equivalent = 4,855 and Lisburne LPC Rich Gas NGLs at CGF gas equivalent =6,624; Block 18: LPC Rich Gas to CGF = 1,812,263 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION FACILITY REPORT OF PRODUCED GAS DISPOSITION 1. Facility Number 3. Field 4. Operator 5. Month/Year of Disposition 0290000009 PBU - GPMA Hilcorp October-2024 Disposition Volume MCF 20. For production from multiple pools, list contribution of each pool as a percent of Total Volume. 6. Sold 138,696 Pool Name Pool Code 7. Reinjected 7,313,238 Prudhoe Bay, Lisburne Oil 640144 Prudhoe Bay, Niakuk Oil 640148 8. Flared or vented 1 hour or less 837 Prudhoe Bay, W Bch Tr Un 640187 Prudhoe Bay, Sag Riv Undef 640165 9. Flared or vented more than 1 hour (see instr.)0 Prudhoe Bay, Prudhoe Oil 640150 Prudhoe Bay, W Beach Oil 640186 10. Pilot and Purge 12,357 Prudhoe Bay, Pt M Stump Is 640183 Prudhoe Bay, N Prudhoe Bay 640152 BROOKIAN UND OIL 640132 12. Fuel gas used in lease operations.883,228 AOGCC Use Only 13. Other (see instructions)3,599,782 MCF Safety: Lease Use: 14. TOTAL VOLUME (ITEMS 6-13)12,095,141 11. Assist Gas 147,003 MCFAuthorization >1 hr: Conservation:MCF 15. NGL Gas Equivalent 138,696 MCF 16. Purchased gas 0 Waste: Contact Phone:Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60° F. Authority 20 AAC 25.235.Contact Email:Richard.Everett@hilcorp.com Form 10-422 Revised 10/2021 Reviewed by: COMMISSIONER Title: Senior Accounting Advisor 713-757-7133 Comm.Comm. Block 13: Lift Gas Off Field; Block 17: MI from Prudhoe = 2,101,944 and Fuel Gas from Prudhoe = 0 17. Transferred from:2,101,944 18. Transferred to: (Express as a negative #)-1,812,263 I hereby certify that the foregoing is true and correct to the best of my knowledge. Revision? Date of Revision: Authorized Name and Digital Signature with Date: Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in Duplicate Hilcorp Energy Company ALASKA CONSERVATION ORDER NO. 219 PRUDHOE BAY, PRUDHOE LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Oct-24 VOLUME PLANNED DATE TIME (Mscf)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 10/3/2024 1:18-1:22 20 P 10/3/2024 23:29-23:33 25 P 10/4/2024 13:46-14:00 25 U 10/4/2024 14:45-14:46 15 U Total Flare <= 1 Hour 85 Total Flare > 1 Hour 0 Volume Flared 85 Measured Safety Pilot 1,346 Continuous Assist 15,999 TOTAL FLARED 17,430 Hilcorp Energy Company ALASKA CONSERVATION ORDER NO. 219 PRUDHOE BAY, LISBURNE LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Oct-24 VOLUME PLANNED DATE TIME (MSCF)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 10/3/2024 1:18-1:22 125 P 10/3/2024 23:29-23:33 152 P 10/4/2024 13:46-14:00 152 U 10/4/2024 14:45-14:46 90 U Total Flare <= 1 Hour 519 Total Flare > 1 Hour 0 Volume Flared 519 Measured Safety Pilot 6,309 Continuous Assist 75,263 TOTAL FLARED 82,091 Hilcorp Energy Company ALASKA CONSERVATION ORDER NO. 219 PRUDHOE BAY, POINT MCINTYRE LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Oct-24 VOLUME PLANNED DATE TIME (MSCF)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 10/03/24 1:18-1:22 55 P 10/03/24 23:29-23:33 67 P 10/04/24 13:46-14:00 67 U 10/04/24 14:45-14:46 39 U Total Flare <= 1 Hour 228 Total Flare > 1 Hour 0 Volume Flared 228 Measured Safety Pilot 4,635 Continuous Assist 54,946 TOTAL FLARED 59,809 Hilcorp Energy Company ALASKA CONSERVATION ORDER NO. 219 PRUDHOE BAY, WEST BEACH LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Oct-24 VOLUME PLANNED DATE TIME (MSCF)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 10/3/2024 1:18-1:22 0 P 10/3/2024 23:29-23:33 0 P 10/4/2024 13:46-14:00 0 U 10/4/2024 14:45-14:46 0 U Total Flare <= 1 Hour 0 Total Flare > 1 Hour 0 Volume Flared 0 Measured Safety Pilot 0 Continuous Assist 0 TOTAL FLARED 0 Hilcorp Energy Company ALASKA CONSERVATION ORDER NO. 219 PRUDHOE BAY, NORTH PRUDHOE BAY LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Oct-24 VOLUME PLANNED DATE TIME (MSCF)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 10/3/2024 1:18-1:22 0 P 10/3/2024 23:29-23:33 0 P 10/4/2024 13:46-14:00 0 U 10/4/2024 14:45-14:46 0 U Total Flare <= 1 Hour 0 Total Flare > 1 Hour 0 Volume Flared 0 Measured Safety Pilot 0 Continuous Assist 0 TOTAL FLARED 0 Hilcorp Energy Company ALASKA CONSERVATION ORDER NO. 219 PRUDHOE BAY, COMBINED NIAKUK LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Oct-24 VOLUME PLANNED DATE TIME (Mscf)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 10/3/2024 1:18-1:22 0 P 10/3/2024 23:29-23:33 0 P 10/4/2024 13:46-14:00 0 U 10/4/2024 14:45-14:46 1 U Total Flare <= 1 Hour 1 Total Flare > 1 Hour 0 Volume Flared 1 Measured Safety Pilot 17 Continuous Assist 205 TOTAL FLARED 223 Hilcorp Energy Company ALASKA CONSERVATION ORDER NO. 219 PRUDHOE BAY, RAVEN LISBURNE PRODUCTION CENTER GAS FLARING INCIDENTS Oct-24 VOLUME PLANNED DATE TIME (Mscf)DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE 10/3/2024 1:18-1:22 1 P 10/3/2024 23:29-23:33 1 P 10/4/2024 13:46-14:00 1 U 10/4/2024 14:45-14:46 1 U Total Flare <= 1 Hour 4 Total Flare > 1 Hour 0 Volume Flared 4 Measured Safety Pilot 50 Continuous Assist 590 TOTAL FLARED 644 2. Facility NamePBU LISBURNE PROD (GPMA)Percent52.3%0.1%0.0%0.3%9.9%0.0%0.0%0.1%0.0%19. Remarks:Pt McIntyre NGLs at CGF gas equivalent = 20,060; Pt McIntyre LPC Rich Gas NGLs at CGF gas equivalent = 4,353 andLisburne LPC Rich Gas NGLs at CGF gas equivalent =6,078;Block 18: LPC Rich Gas to CGF = 1,775,623STATE OF ALASKAALASKA OIL AND GAS CONSERVATION COMMISSIONFACILITY REPORT OF PRODUCED GAS DISPOSITION1. Facility Number3. Field4. Operator5. Month/Year of Disposition0290000009PBU - GPMAHilcorpNovember-2024DispositionVolume MCF20.For production from multiple pools, list contribution of each pool as a percent ofTotal Volume.6. Sold132,796Pool NamePool Code7. Reinjected7,622,651Prudhoe Bay, Lisburne Oil640144Prudhoe Bay, Niakuk Oil6401488. Flared or vented 1 hour or less0Prudhoe Bay, W Bch Tr Un 640187Prudhoe Bay, Sag Riv Undef 6401659. Flared or vented more than 1 hour (see instr.)10,277Prudhoe Bay, Prudhoe Oil640150Prudhoe Bay, W Beach Oil64018610. Pilot and Purge12,408BROOKIAN UND OIL640132Prudhoe Bay, Pt M Stump Is 640183Prudhoe Bay, N Prudhoe Bay 64015212. Fuel gas used in lease operations.817,167AOGCC Use Only13. Other (see instructions)3,495,107MCFSafety:Lease Use:14. TOTAL VOLUME (ITEMS 6-13)12,229,78511. Assist Gas139,379MCFAuthorization >1 hr:Conservation:MCF15. NGL Gas Equivalent132,796MCF16. Purchased gas0Waste:Contact Phone:Note: All volumes must be corrected to pressure of 14.65 psia and to a temperature of 60° F. Authority 20 AAC 25.235.Contact Email:Richard.Everett@hilcorp.comForm 10-422 Revised 10/2021Reviewed by:COMMISSIONERTitle: Senior Accounting Advisor713-757-7133Comm.Comm.Block 13: Lift Gas Off Field; Block 17: MI from Prudhoe = 2,177,089 and Fuel Gas from Prudhoe = 017. Transferred from:2,177,08918. Transferred to: (Express as a negative #)-1,775,623I hereby certify that the foregoing is true and correct to the best of my knowledge. Revision? Date of Revision: Authorized Name and Digital Signature with Date:Form 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in DuplicateDigitally signed by Richard Everett (006020)DN: cn=Richard Everett (006020)Date: 2024.12.18 13:41:09 -09'00'Richard Everett (006020):&%Wasty:JLC 7/30/2025 Hilcorp Energy Company ALASKACONSERVATION ORDER NO. 219PRUDHOE BAY, PRUDHOELISBURNE PRODUCTION CENTERGAS FLARING INCIDENTSNov-24VOLUME PLANNEDDATE TIME (Mscf) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSETotal Flare <= 1 Hour011/16/24 5:23:00 - 8:44:00 1,2001808 Reinjection Compressor shutdown because of contol/instrumentation failure @ 38L0019 Overhead Seal Oil Tank level.UEquipment malfunction repaired; Restarted 1808 Reinjection Compressor on second attempt; resumed Normal Operations.Total Flare > 1 Hour1,200Volume Flared 1,200Measured Safety Pilot 1,224Continuous Assist 13,764TOTAL FLARED 16,188 Hilcorp Energy Company ALASKACONSERVATION ORDER NO. 219PRUDHOE BAY, LISBURNELISBURNE PRODUCTION CENTERGAS FLARING INCIDENTSNov-24VOLUME PLANNEDDATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSETotal Flare <= 1 Hour011/16/20245:23:00 - 8:44:00 5,5321808 Reinjection Compressor shutdown because of contol/instrumentation failure @ 38L0019 Overhead Seal Oil Tank level.UEquipment malfunction repaired; Restarted 1808 Reinjection Compressor on second attempt; resumed Normal Operations.Total Flare > 1 Hour5,532Volume Flared 5,532Measured Safety Pilot 6,492Continuous Assist 72,969TOTAL FLARED 84,993 Hilcorp Energy Company ALASKACONSERVATION ORDER NO. 219PRUDHOE BAY, POINT MCINTYRELISBURNE PRODUCTION CENTERGAS FLARING INCIDENTSNov-24VOLUME PLANNEDDATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSETotal Flare <= 1 Hour011/16/24 5:23:00 - 8:44:00 3,4941808 Reinjection Compressor shutdown because of contol/instrumentation failure @ 38L0019 Overhead Seal Oil Tank level.UEquipment malfunction repaired; Restarted 1808 Reinjection Compressor on second attempt; resumed Normal Operations.Total Flare > 1 Hour3,494Volume Flared 3,494Measured Safety Pilot 4,631Continuous Assist 51,968TOTAL FLARED 60,093 Hilcorp Energy Company ALASKACONSERVATION ORDER NO. 219PRUDHOE BAY, WEST BEACHLISBURNE PRODUCTION CENTERGAS FLARING INCIDENTSNov-24VOLUME PLANNEDDATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSETotal Flare <= 1 Hour011/16/24 5:23:00 - 8:44:00 01808 Reinjection Compressor shutdown because of contol/instrumentation failure @ 38L0019 Overhead Seal Oil Tank level.UEquipment malfunction repaired; Restarted 1808 Reinjection Compressor on second attempt; resumed Normal Operations.Total Flare > 1 Hour0Volume Flared 0Measured Safety Pilot 0Continuous Assist 0TOTAL FLARED 0 Hilcorp Energy Company ALASKACONSERVATION ORDER NO. 219PRUDHOE BAY, NORTH PRUDHOE BAYLISBURNE PRODUCTION CENTERGAS FLARING INCIDENTSNov-24VOLUME PLANNEDDATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSETotal Flare <= 1 Hour011/16/24 5:23:00 - 8:44:00 01808 Reinjection Compressor shutdown because of contol/instrumentation failure @ 38L0019 Overhead Seal Oil Tank level.UEquipment malfunction repaired; Restarted 1808 Reinjection Compressor on second attempt; resumed Normal Operations.Total Flare > 1 Hour0Volume Flared 0Measured Safety Pilot 0Continuous Assist 0TOTAL FLARED 0 Hilcorp Energy Company ALASKACONSERVATION ORDER NO. 219PRUDHOE BAY, COMBINED NIAKUKLISBURNE PRODUCTION CENTERGAS FLARING INCIDENTSNov-24VOLUME PLANNEDDATE TIME (Mscf) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSETotal Flare <= 1 Hour011/16/24 5:23:00 - 8:44:00 161808 Reinjection Compressor shutdown because of contol/instrumentation failure @ 38L0019 Overhead Seal Oil Tank level.UEquipment malfunction repaired; Restarted 1808 Reinjection Compressor on second attempt; resumed Normal Operations.Total Flare > 1 Hour16Volume Flared 16Measured Safety Pilot 16Continuous Assist 177TOTAL FLARED 209 BP EXPLORATION ALASKA, INC,CONSERVATION ORDER NO. 219PRUDHOE BAY, BROOKIANLISBURNE PRODUCTION CENTERGAS FLARING INCIDENTSNov-24VOLUME PLANNEDDATE TIME (Mscf) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSETotal Flare <= 1 Hour011/16/245:23:00 - 8:44:00 01808 Reinjection Compressor shutdown because of contol/instrumentation failure @ 38L0019 Overhead Seal Oil Tank level.UEquipment malfunction repaired; Restarted 1808 Reinjection Compressor on second attempt; resumed Normal Operations.Total Flare > 1 Hour0Volume Flared 0Measured Safety Pilot 0Continuous Assist 0TOTAL FLARED 0 Hilcorp Energy Company ALASKACONSERVATION ORDER NO. 219PRUDHOE BAY, RAVENLISBURNE PRODUCTION CENTERGAS FLARING INCIDENTSNov-24VOLUME PLANNEDDATE TIME (Mscf) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSETotal Flare <= 1 Hour011/16/24 5:23:00 - 8:44:00 351808 Reinjection Compressor shutdown because of contol/instrumentation failure @ 38L0019 Overhead Seal Oil Tank level.UEquipment malfunction repaired; Restarted 1808 Reinjection Compressor on second attempt; resumed Normal Operations.Total Flare > 1 Hour35Volume Flared 35Measured Safety Pilot 45Continuous Assist 501TOTAL FLARED 581 2. Facility NamePBU LISBURNE PROD (GPMA)Percent58.0%0.2%0.0%0.3%4.8%0.0%0.0%0.2%0.0%19. Remarks:Pt McIntyre NGLs at CGF gas equivalent = 22,102; Pt McIntyre LPC Rich Gas NGLs at CGF gas equivalent = 3,467 andLisburne LPC Rich Gas NGLs at CGF gas equivalent =5,540;Block 18: LPC Rich Gas to CGF = 1,620,540Form 10-422 Revised 10/2021Reviewed by:COMMISSIONERTitle: Senior Accounting Advisor713-757-7133Comm. Comm.Block 13: Lift Gas Off Field; Block 17: MI from Prudhoe = 2,289,918 and Fuel Gas from Prudhoe = 017. Transferred from:2,289,91818. Transferred to: (Express as a negative #)-1,620,540I hereby certify that the foregoing is true and correct to the best of my knowledge. Revision? Date of Revision:Authorized Name and Digital Signature with Date:Contact Phone:Note:All volumes must be corrected topressure of 14.65 psia and to a temperature of60° F. Authority 20 AAC 25.235.Contact Email:Richard.Everett@hilcorp.comMCFAuthorization >1 hr:Conservation: MCF15. NGL Gas Equivalent126,671MCF16. Purchased gas0Waste:Prudhoe Bay, N Prudhoe Bay 64015212. Fuel gas used in lease operations.964,012AOGCC Use Only13. Other (see instructions)3,385,120MCFSafety:Lease Use:14. TOTAL VOLUME (ITEMS 6-13)12,254,66211. Assist Gas144,21410. Pilot and Purge12,740BROOKIAN UND OIL 640132Prudhoe Bay, Pt M Stump Is 6401839. Flared or vented more than 1 hour (see instr.)419Prudhoe Bay, Prudhoe Oil 640150Prudhoe Bay, W Beach Oil 640186Prudhoe Bay, Niakuk Oil 6401488. Flared or vented 1 hour or less3,933Prudhoe Bay, W Bch Tr Un 640187Prudhoe Bay, Sag Riv Undef 6401650290000009 PBU - GPMA Hilcorp December-2024Disposition Volume MCF20.For production from multiple pools, list contribution of each pool as a percent ofTotal Volume.6. Sold126,671Pool Name Pool Code7. Reinjected7,617,553Prudhoe Bay, Lisburne Oil 640144STATE OF ALASKAALASKA OIL AND GAS CONSERVATION COMMISSIONFACILITY REPORT OF PRODUCED GAS DISPOSITION1. Facility Number 3. Field 4. Operator 5. Month/Year of DispositionForm 10-422 Rev. 5/2009 INSTRUCTIONS ON REVERSE SIDE Submit in DuplicateDigitally signed by Richard Everett (006020)DN: cn=Richard Everett (006020)Date: 2025.01.18 15:40:31 -09'00'Richard Everett (006020):&%JLC 7/30/2025 Hilcorp Energy Company ALASKACONSERVATION ORDER NO. 219PRUDHOE BAY, PRUDHOELISBURNE PRODUCTION CENTERGAS FLARING INCIDENTSDec-24VOLUME PLANNEDDATE TIME (Mscf) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE12/12/202421:18 - 22:00 18Phase 3 weather conditions caused total blackout; tripping generators; 1800, 1807, & 1808 compressors shut down; operator flare vent valves opened.UShut-in flow from all drill site locations; compressors completed shut-down sequence12/31/202414:33 - 14:34 01801 Compressor did not react quick enough to a flow upset from EST 1203 to COSD 1205 resulting in Pressure Release into LP Flare.U Took manual control of the flow valve.Total Flare <= 1 Hour1812/13/20245:00 - 15:00 0Intermittent flaring of STV Compressor and HP while bringing equipment back online following power outage.USuccessfully brought rate back online as power was restored.12/15/20240:00 - 20:00 2 Equipment shutdown due to power outage. USuccessfully brought rate back online as power was restored.12/15/20240:01 - 22:00 01807 Reinjection Compressor shutdown due to control/instumentation failure associated with power outageU 1807/1808 restartedTotal Flare > 1 Hour2Volume Flared 20Measured Safety Pilot 582Continuous Assist 6,626TOTAL FLARED 7,228 Hilcorp Energy Company ALASKACONSERVATION ORDER NO. 219PRUDHOE BAY, LISBURNELISBURNE PRODUCTION CENTERGAS FLARING INCIDENTSDec-24VOLUME PLANNEDDATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE12/12/202421:18 - 22:00 2,345Phase 3 weather conditions caused total blackout; tripping generators; 1800, 1807, & 1808 compressors shut down; operator flare vent valves opened.UShut-in flow from all drill site locations; compressors completed shut-down sequence12/31/202414:33 - 14:34 01801 Compressor did not react quick enough to a flow upset from EST 1203 to COSD 1205 resulting in Pressure Release into LP Flare.U Took manual control of the flow valve.Total Flare <= 1 Hour2,34512/13/20245:00 - 15:00 96Intermittent flaring of STV Compressor and HP while bringing equipment back online following power outage.USuccessfully brought rate back online as power was restored.12/15/20240:00 - 20:00 119Equipment shutdown due to power outage. USuccessfully brought rate back online as power was restored.12/15/20240:01 - 22:00 41807 Reinjection Compressor shutdown due to control/instumentation failure associated with power outageU 1807/1808 restartedTotal Flare > 1 Hour219Volume Flared 2,564Measured Safety Pilot 7,376Continuous Assist 83,446TOTAL FLARED 93,386 Hilcorp Energy Company ALASKACONSERVATION ORDER NO. 219PRUDHOE BAY, POINT MCINTYRELISBURNE PRODUCTION CENTERGAS FLARING INCIDENTSDec-24VOLUME PLANNEDDATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE12/12/202421:18 - 22:00 1,547Phase 3 weather conditions caused total blackout; tripping generators; 1800, 1807, & 1808 compressors shut down; operator flare vent valves opened.UShut-in flow from all drill site locations; compressors completed shut-down sequence12/31/202414:33 - 14:34 11801 Compressor did not react quick enough to a flow upset from EST 1203 to COSD 1205 resulting in Pressure Release into LP Flare.U Took manual control of the flow valve.Total Flare <= 1 Hour1,54812/13/20245:00 - 15:00 101Intermittent flaring of STV Compressor and HP while bringing equipment back online following power outage.USuccessfully brought rate back online as power was restored.12/15/20240:00 - 20:00 93 Equipment shutdown due to power outage. USuccessfully brought rate back online as power was restored.12/15/20240:01 - 22:00 31807 Reinjection Compressor shutdown due to control/instumentation failure associated with power outageU 1807/1808 restartedTotal Flare > 1 Hour197Volume Flared 1,745Measured Safety Pilot 4,721Continuous Assist 53,450TOTAL FLARED 59,916 Hilcorp Energy Company ALASKACONSERVATION ORDER NO. 219PRUDHOE BAY, WEST BEACHLISBURNE PRODUCTION CENTERGAS FLARING INCIDENTSDec-24VOLUME PLANNEDDATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE12/12/202421:18 - 22:00 0Phase 3 weather conditions caused total blackout; tripping generators; 1800, 1807, & 1808 compressors shut down; operator flare vent valves opened.UShut-in flow from all drill site locations; compressors completed shut-down sequence12/31/202414:33 - 14:34 01801 Compressor did not react quick enough to a flow upset from EST 1203 to COSD 1205 resulting in Pressure Release into LP Flare.U Took manual control of the flow valve.Total Flare <= 1 Hour012/13/20245:00 - 15:00 0Intermittent flaring of STV Compressor and HP while bringing equipment back online following power outage.USuccessfully brought rate back online as power was restored.12/15/20240:00 - 20:00 0 Equipment shutdown due to power outage. USuccessfully brought rate back online as power was restored.12/15/20240:01 - 22:00 01807 Reinjection Compressor shutdown due to control/instumentation failure associated with power outageU 1807/1808 restartedTotal Flare > 1 Hour0Volume Flared 0Measured Safety Pilot 0Continuous Assist 0TOTAL FLARED 0 Hilcorp Energy Company ALASKACONSERVATION ORDER NO. 219PRUDHOE BAY, NORTH PRUDHOE BAYLISBURNE PRODUCTION CENTERGAS FLARING INCIDENTSDec-24VOLUME PLANNEDDATE TIME (MSCF) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE12/12/202421:18 - 22:00 0Phase 3 weather conditions caused total blackout; tripping generators; 1800, 1807, & 1808 compressors shut down; operator flare vent valves opened.UShut-in flow from all drill site locations; compressors completed shut-down sequence12/31/202414:33 - 14:34 01801 Compressor did not react quick enough to a flow upset from EST 1203 to COSD 1205 resulting in Pressure Release into LP Flare.U Took manual control of the flow valve.Total Flare <= 1 Hour012/13/20245:00 - 15:00 0Intermittent flaring of STV Compressor and HP while bringing equipment back online following power outage.USuccessfully brought rate back online as power was restored.12/15/20240:00 - 20:00 0 Equipment shutdown due to power outage. USuccessfully brought rate back online as power was restored.12/15/20240:01 - 22:00 01807 Reinjection Compressor shutdown due to control/instumentation failure associated with power outageU 1807/1808 restartedTotal Flare > 1 Hour0Volume Flared 0Measured Safety Pilot 0Continuous Assist 0TOTAL FLARED 0 Hilcorp Energy Company ALASKACONSERVATION ORDER NO. 219PRUDHOE BAY, COMBINED NIAKUKLISBURNE PRODUCTION CENTERGAS FLARING INCIDENTSDec-24VOLUME PLANNEDDATE TIME (Mscf) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE12/12/202421:18 - 22:00 7Phase 3 weather conditions caused total blackout; tripping generators; 1800, 1807, & 1808 compressors shut down; operator flare vent valves opened.UShut-in flow from all drill site locations; compressors completed shut-down sequence12/31/202414:33 - 14:34 01801 Compressor did not react quick enough to a flow upset from EST 1203 to COSD 1205 resulting in Pressure Release into LP Flare.U Took manual control of the flow valve.Total Flare <= 1 Hour712/13/20245:00 - 15:00 0Intermittent flaring of STV Compressor and HP while bringing equipment back online following power outage.USuccessfully brought rate back online as power was restored.12/15/20240:00 - 20:00 0 Equipment shutdown due to power outage. USuccessfully brought rate back online as power was restored.12/15/20240:01 - 22:0001807 Reinjection Compressor shutdown due to control/instumentation failure associated with power outageU 1807/1808 restartedTotal Flare > 1 Hour0Volume Flared 7Measured Safety Pilot 18Continuous Assist 209TOTAL FLARED 234 Hilcorp Energy Company ALASKACONSERVATION ORDER NO. 219PRUDHOE BAY, BROOKIANLISBURNE PRODUCTION CENTERGAS FLARING INCIDENTSDec-24VOLUME PLANNEDDATE TIME (Mscf) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE12/12/202421:18 - 22:00 0Phase 3 weather conditions caused total blackout; tripping generators; 1800, 1807, & 1808 compressors shut down; operator flare vent valves opened.UShut-in flow from all drill site locations; compressors completed shut-down sequence12/31/202414:33 - 14:34 01801 Compressor did not react quick enough to a flow upset from EST 1203 to COSD 1205 resulting in Pressure Release into LP Flare.U Took manual control of the flow valve.Total Flare <= 1 Hour012/13/20245:00 - 15:00 0Intermittent flaring of STV Compressor and HP while bringing equipment back online following power outage.USuccessfully brought rate back online as power was restored.12/15/20240:00 - 20:00 0 Equipment shutdown due to power outage. USuccessfully brought rate back online as power was restored.12/15/20240:01 - 22:00 01807 Reinjection Compressor shutdown due to control/instumentation failure associated with power outageU 1807/1808 restartedTotal Flare > 1 Hour0Volume Flared 0Measured Safety Pilot 0Continuous Assist 0TOTAL FLARED 0 Hilcorp Energy Company ALASKACONSERVATION ORDER NO. 219PRUDHOE BAY, RAVENLISBURNE PRODUCTION CENTERGAS FLARING INCIDENTSDec-24VOLUME PLANNEDDATE TIME (Mscf) DESCRIPTION OF INCIDENTS & CAUSE UNPLANNED ACTION TAKEN TO ELIMINATE CAUSE12/12/202421:18 - 22:00 15Phase 3 weather conditions caused total blackout; tripping generators; 1800, 1807, & 1808 compressors shut down; operator flare vent valves opened.UShut-in flow from all drill site locations; compressors completed shut-down sequence12/31/202414:33 - 14:34 01801 Compressor did not react quick enough to a flow upset from EST 1203 to COSD 1205 resulting in Pressure Release into LP Flare.U Took manual control of the flow valve.Total Flare <= 1 Hour1512/13/24 5:00 - 15:00 0Intermittent flaring of STV Compressor and HP while bringing equipment back online following power outage.USuccessfully brought rate back online as power was restored.12/15/24 0:00 - 20:00 1 Equipment shutdown due to power outage. USuccessfully brought rate back online as power was restored.12/15/24 0:01 - 22:00 01807 Reinjection Compressor shutdown due to control/instumentation failure associated with power outageU 1807/1808 restartedTotal Flare > 1 Hour1Volume Flared 16Measured Safety Pilot 43Continuous Assist 483TOTAL FLARED 542