Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout190-055From:Rixse, Melvin G (OGC) To:Erik Nelson Subject:20250912 1646 APPROVAL Request for liighter fluids to prevent losses PTD 190-055 Sundry 325-553 Date:Friday, September 12, 2025 4:48:18 PM Attachments:image001.png image002.png Erik, Thanks for the note. Sounds like you are zeroing in on your actual pore pressures. Hilcorp is approved to proceed as you described below. Mel Rixse Senior Petroleum Engineer (PE) Alaska Oil and Gas Conservation Commission 907-793-1231 Office 907-297-8474 Cell CONFIDENTIALITY NOTICE: This e-mail message, including any attachments, contains information from the Alaska Oil and Gas Conservation Commission (AOGCC), State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged information. The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an unintended recipient of this e-mail, please delete it, without first saving or forwarding it, and, so that the AOGCC is aware of the mistake in sending it to you, contact Mel Rixse at (907-793-1231 ) or (Melvin.Rixse@alaska.gov). From: Erik Nelson <erik.nelson@hilcorp.com> Sent: Friday, September 12, 2025 4:09 PM To: Rixse, Melvin G (OGC) <melvin.rixse@alaska.gov> Subject: RE: [EXTERNAL] 20250909 1608 APPROVAL Request for Verbal Approval of COP on MPU H-03 (PTD# 190-088) operating under Approved Sundry# 325-553... Mel, Very much appreciate the AOGCC turning around our 10-403 COP for MPU H-03. I have noted the AOGCC’s COA on Approved Sundry# 325-553 and have changed the Subject line on this email chain. As we have been preparing for our 2nd TCP run we’ve been monitoring the fluid level in the well and have determined that, with 8.7 #/gal in the hole, our fluid level has remained unchanged at +/- 114-ft MD. This fluid level calculates out to a reservoir pressure of 957 psi (8.28 #/gal equivalent) at our top perforation at 2500-ft MD (2230-ft TVD). Our analysis of offset well data previously anticipated the formation pressure to be 996 psi (8.59 #/gal equivalent) at that depth which we used to anticipate our planned fluid weights for the workover. Given this recently acquired information we would like to change our fluid weight during our perf surge and cleanout runs to as low as 8.5 #/gal rather than the 8.7 #/gal that was stated, and thus Approved, in our latest Application for Sundry Approval. We plan on taking it down to 8.6 #/gal initially to see if we can maintain returns while circulating but we are requesting approval to take it as low as 8.5 #/gal. The 8.7 #/gal fluid weight is specified in the following Steps with Approved Sundry# 325-553: CAUTION: External sender. DO NOT open links or attachments from UNKNOWN senders. 58. Reverse circulating from +/- 2270-ft MD after allowing the formation to surge up the dry tbg string 66. Displacement of wellbore after cleaning out to the sump packer (3213-ft MD) 78. c) i) This step is displacement of the tbg pickle in preparation for pumping the gravel pack 79. We were already planning to pump the gravel pack with freshwater but the procedure calls for circulating around the heavier fluid before we TOOH We believe this change in fluid weights will help us minimize our fluid losses to the formation while still maintaining appropriate primary well control with our workover fluid. Thank you for your time and consideration of our request. Please let me know if you have any questions and or require any additional information. Q From: Rixse, Melvin G (OGC) <melvin.rixse@alaska.gov> Sent: Thursday, September 11, 2025 3:23 PM To: Erik Nelson <erik.nelson@hilcorp.com> Subject: RE: [EXTERNAL] 20250909 1608 APPROVAL Request for Verbal Approval of COP on MPU H-03 (PTD# 190-088) operating under Approved Sundry# 325-487... Erik, I will push staff to make this urgent. Mel From: Erik Nelson <erik.nelson@hilcorp.com> Sent: Thursday, September 11, 2025 11:43 AM To: Rixse, Melvin G (OGC) <melvin.rixse@alaska.gov> Subject: RE: [EXTERNAL] 20250909 1608 APPROVAL Request for Verbal Approval of COP on MPU H-03 (PTD# 190-088) operating under Approved Sundry# 325-487... Mel, I’ve submitted a 10-403 COP today for MPU H-03. This COP will include the changes to the Approved Sundry that were authorized below as well as a request to approve a perf surge run after we get our TCP gun runs completed. After that perf surge run we should be back on our original Approved Sundry but I did make the changes to the final completion that were adjusted due to the changes in the sump packer set depth and perforation intervals. st nd CAUTION: This email originated from outside the State of Alaska mail system. Do not click links or open attachments unless you recognize the sender and know the content is safe. CAUTION: External sender. DO NOT open links or attachments from UNKNOWN senders. We’re currently running in with our 1 TCP gun run which will be followed by a 2 TCP gun run. I’m forecasting we will be ready to make our perf surge run tomorrow evening. Thank you for your time and consideration of my request. Please let me know if you’ve got any questions and/or comments. Q From: Rixse, Melvin G (OGC) <melvin.rixse@alaska.gov> Sent: Tuesday, September 9, 2025 4:11 PM To: Erik Nelson <erik.nelson@hilcorp.com> Subject: [EXTERNAL] 20250909 1608 APPROVAL Request for Verbal Approval of COP on MPU H-03 (PTD# 190- 088) operating under Approved Sundry# 325-487... Erik, Hilcorp is approved to proceed with perforations and sump packer setting as described below. Mel Rixse Senior Petroleum Engineer (PE) Alaska Oil and Gas Conservation Commission 907-793-1231 Office 907-297-8474 Cell CONFIDENTIALITY NOTICE: This e-mail message, including any attachments, contains information from the Alaska Oil and Gas Conservation Commission (AOGCC), State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged information. The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an unintended recipient of this e-mail, please delete it, without first saving or forwarding it, and, so that the AOGCC is aware of the mistake in sending it to you, contact Mel Rixse at (907-793-1231 ) or (Melvin.Rixse@alaska.gov). From: Erik Nelson <erik.nelson@hilcorp.com> Sent: Tuesday, September 9, 2025 3:53 PM To: Rixse, Melvin G (OGC) <melvin.rixse@alaska.gov> Subject: Request for Verbal Approval of COP on MPU H-03 (PTD# 190-088) operating under Approved Sundry# 325-487... Mel, We got our E-Line logging done last night and received the processed logs this afternoon on MPU H-03. The Tertiary Undef WTRSP (525130) aquifer came in a little different than our correlations from offset well logs. We are proposing the below new perforations in our pursuit of turning MPU H-03 into a WSW: New Proposed Perfs: Currently Approved Perfs: In our currently approved Sundry# 325-487 we proposed setting our sump pkr at +/- 3295-ft MD (2793-ft TVD). Due to the adjustments in the perforations I would like to set it at +/- 3213-ft MD (2733-ft MD). I am prepping a 10-403 COP but we will be running the sump pkr this evening so I am requesting verbal permission to proceed. Q Erik Q. Nelson Milne Point OE O (907) 777 - 8353 C (907) 903 – 7407 Erik.Nelson@hilcorp.com The information contained in this email message is confidential and may be legally privileged and is intended only for the use of the individual or entitynamed above. If you are not an intended recipient or if you have received this message in error, you are hereby notified that any dissemination,distribution, or copy of this email is strictly prohibited. If you have received this email in error, please immediately notify us by return email or telephoneif the sender's phone number is listed above, then promptly and permanently delete this message. While all reasonable care has been taken to avoid the transmission of viruses, it is the responsibility of the recipient to ensure that the onwardtransmission, opening, or use of this message and any attachments will not adversely affect its systems or data. No responsibility is accepted by thecompany in this regard and the recipient should carry out such virus and other checks as it considers appropriate. The information contained in this email message is confidential and may be legally privileged and is intended only for the use of the individual or entitynamed above. If you are not an intended recipient or if you have received this message in error, you are hereby notified that any dissemination,distribution, or copy of this email is strictly prohibited. If you have received this email in error, please immediately notify us by return email or telephoneif the sender's phone number is listed above, then promptly and permanently delete this message. While all reasonable care has been taken to avoid the transmission of viruses, it is the responsibility of the recipient to ensure that the onwardtransmission, opening, or use of this message and any attachments will not adversely affect its systems or data. No responsibility is accepted by the company in this regard and the recipient should carry out such virus and other checks as it considers appropriate. The information contained in this email message is confidential and may be legally privileged and is intended only for the use of the individual or entitynamed above. If you are not an intended recipient or if you have received this message in error, you are hereby notified that any dissemination,distribution, or copy of this email is strictly prohibited. If you have received this email in error, please immediately notify us by return email or telephoneif the sender's phone number is listed above, then promptly and permanently delete this message. While all reasonable care has been taken to avoid the transmission of viruses, it is the responsibility of the recipient to ensure that the onwardtransmission, opening, or use of this message and any attachments will not adversely affect its systems or data. No responsibility is accepted by thecompany in this regard and the recipient should carry out such virus and other checks as it considers appropriate. THE MATERIAL UNDER THIS COVER HAS BEEN MICROFILMED ON OR BEFORE OCTOBER 27, 20.00 P M C:LORIXMi~LM.DOC L A T E R IA L THIS MA E E E W UNDER R K E R STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION DI: ~fr~a~l~ffrp(~ljack '~,, L/VI... i,~ WELL COMPLETION OR RECOMPLETION REPORT AND L 1. Status of Well Classification of Servi~Wel¢- '-) '~J~ [] Oil ~-~ Gas I-~ Suspended [] Abandoned [-~ Service Water Injection ...... ,_. '2':'"' I~me of Operator ............ 7. Permit N~11~ia 0il & Gas Con.~, BP Exploration (Alaska)Inc. 90-55 3§8c~esage 3. Address 8. APl Number P.O. Box 196612, Anchorage, Alaska 99519-6612 50-029-22044 4. Location of well at surface . · 9. Unit or Lease Name 1633' SNL, 1050' NWL, SEC. 35, T12N, R12E, UM! ~~. ~ Prudhoe Bay Unit ,,, At top of productive interval 10. Well Number 4572' SNL, 1500' WEL, SEC. 26, T12N, R12E, UM S-24 At total depth 11~':~ 11. Field and Pool 4483' SNL, 1289' WEL, SEC. 26, T12N, R12E, UM~ Prudhoe Bay Field / Prudhoe Bay 5. Elevation in feet (indicate KB, DF, etc.) 16. Lease Designation and Serial No. Pool KBE -- 66.25'I 028257 12. Dat~ 'Spudded 1'i3: Date T,D. Reached 114. Date Comp., Susp., or Aband. 115. Water depth, if offshore 116. No. of Completions . 4/24/90 I 5/7/90I 11/29/98 .....I N/A MSLI Zero 'i'~. Total Depth (MD+TVD)118. Plug Back Depth (MD+TVD)I19. Directional Survey ]20. Depth where SSSV set121. Thickness of Permafrost 10428 9311 FTI 10017 8961 FTI i-~Yes [~No/ N/A MDI 1900' (Approx.) 22. Type Electric or Other Logs Run DIFL/BHC/NEU/GR D I kl ^ ! 23. CASING~ LINER AND CEMENTING RECORD ~J I ~ I U I I ~1 /'~ L.., CASING SETTING DEPTH HOLE SIZE WT. PER FT. GRADE ToP BOTTOM SIZE CEMENTING RECORD AMOUNT PULLED 20" Insulated Conductor Surface 110' B cu yds Concrete 13-3/8" 68# L-80 Surface 2668' 17-1/2" ;)580 cu ft Arcticset II & III 9-5/8" 47# L-80 2739' 9843' 12-1/4" ;)040 cu ft Class 'G' Cut & Pulled Casing 7" 26# L-80 9590' 10428' 8-1/2" ;)58 cu ft Class 'G' 24. Perforations open to Production (MD+TVD of Top and 25. TUBING RECORD Bottom and interval, size and number) S~ZE DEPTH SET (MD) PACKER SET (MD) None N/A MD TVD MD TVD ....... 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED 9016' P&A wi{h 40 Bbls Class 'G', Sqzd to 800 psi 3020' Set EZSV 2669' Kick Off Plug, 65 Bbls Class 'G' 27. PRODUCTION TEST Date First Producti'(~n' ' I Method of Operation (Flowing,. gas lift, etc.) " Not on Production I N/A I~ate of Test Hours Tested PRODUCTION FOR OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE I GAS-OIL RATIO TEST PERIOD I Flow Casing Pressure iCALCULATE OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-APl (CORR) Tubing ...................................... !D 24-HOUR .. PZ~.SS. RATE coRE 'DA~A " ,,, B'def descripti'~'n of iithology, porosity, fractures, apl::;'"a';;'~i'"dips and presence of oil, gas or water. "'~ubmit core chips. ~i0n Form 10-407 Rev. 07-01-80 Submit In Duplicate 29. Geologic Markers 30. Formation Tests Measured True Vertical Include interval tested, pressure data, all fluids recovered and Marker Name Depth Depth gravity, GOR, and time of each phase. Sag River 9834' 8808' Shublik 'A' 9883' 8849' Zone 4 9991' 8939' 31. List of Attachments Summary of Daily Drilling Reports .............................................................. 32. I her;'~'Y;"certify that the foregoing is true and correct to the best of my knowledge Signed TerrieHubble ,~r~.~ ~ Title Technical Assistantlll Date S-24 90-55 398-313 Prepared By Name/Number: Terrie Hubble, 564-4628 Well Number Permit No. / Approval No. ........... ~NSTRUCTIONS GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. ITEM 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. ITEM 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. ITEM 16 AND 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. ITEM 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). ITEM 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. ITEM 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, Other-explain. ITEM 28: If no cores taken, indicate 'none'. Form 10-407 Rev. 07-01-80 To: Prudhoe Bay Production Engineering Date: 11-29-98 From: Clump AFE: 4P1200 Well: S-24i Description: Sidetrack/Prep/etc. Operation: Cement Abandonment Plug for Sidetrack Detail Code: 9335-070-730 Summary MIRU DS CUT Pump -2" hardline to tree cap. Well is SI. Whp=0 psi. Hold Safety Meeting. Mix chemicals. PT hardline to 4000 psig. Come on line and pump 100 bbls 2% kcl water. Injectivity looks real good (4.8 bpm @ 940 psig). Pump 10 bbls ahead fresh water spacer. Come on line with 3 bbls of 15.8 ppg neat cmt, followed by 10 bbls aggregate cmt (20 ppb-200#'s total), and follow with 27 bbls neat. Displace to perfs w/96 bbls fresh water followed by 19 bbls diesel. Continue to pump diesel until see pressure increase 40 bbls diesel pumped. Hesitate for 1/2 hour. Pump up to 800 psig w/1.5 bbls. Pressure falls off to 470 psig after 20 mins. Pressure up to 725 psig. Lost 84 psig after 5 mins. Decide to RDMO. Have grease crew cycle and grease valves on tree. · Tubing has been FP to 2730' with diesel · Estimated TOC in tubin~l @ 8650'. Put approximately 12 bbls cmt behind pipe. Time Operation 11/29/98 1400 Miru DS CMT Pump. Rig 2" Hardline to Pump in Cap. 1500 Safety Meeting. Discuss Job. Discuss Spill Champion. PT Hardline. 1520 Mix up chemicals. 1549 Finished mixing chemicals. 1554 PT Hardline to 4000 psig- good. Initial Well Status SlWHP lAP OAP FLP FLT (psig) (psis) (psig) (psig) (deg F) SI 0 0 500 2125 60 Time Rate Press Stage Cum Remarks BPM Volume Volume 1600 0 0 0 0 Come on line for 100 bbls 2% KCL Injectivity test. 1618 4.8 940 100/ 100 Switch to 10 bbls Fresh water. 1620 4.8/0 600 10/ 110 Shut down- get ready for cmt. 1630 1.5 400 0 110 Start pumping 3 bbls Neat Cmt. 1631 1.5/3 444 3/ 113 Switch to 10 bbls Aggregate. 1635 4 540 10/ 123 Switch back to Neat. 1647 5 50 27/ 150 Lost tub. So have 40 bbls total cmt. Switch to Fresh Water. 1705 5 252 96/ 246 Switch to diesel. 1710 5 240 19 265 Cmt @ Top perf. 1711 5/4 700 27 273 Starting to see a pressure response. 1714 3/2 990 37 283 1716 2/0 746 40 286 Shut down for hesitation. Cmt top should be @ ~ 8550'. 1746 min 360 40 286 Come on line min rate. 1748 min/O 800 41.5 287.5 Pump 1.5 bbls and Whp= 800 psig. Shut down for another hesitation. 1808 min 470 41.5 287.5 Whp has fallen to 470 psig. Come on line to bump it up. 1810 min/O 725 41.9 287.9 Pump 0.4 bbls to Pressure up to 725 psig. Shut down. Call for grease crew to service valves on tree. 1815 0 641 41.9 287.9 Lost 84 psig in 5 mins. Clean up cementers & RDMO. Slick line will have to test in the morning when drifting. 1950 MOL cementers. Hang FP tag on master. Tree cap gauge may be broken only showing 20 psi~l. Will see what slickline has on it in the morning]. S-24i Sidetrack Prep November 11,1998 Final Well Status SlWHP lAP OAP FLP FLT (psig) (psig) (psig) (psig) (deg F) SI 20? 50 430 2150 55 Page 2 Fluids Summary Fluids Pumped BBLS. Description 106 Fresh water. 100 2% kcl water. 42 Diesel 40 Cement (3 neat, 10 aggregate, 27 neat). Class G, 15.8 ppg. Aggregate was 20 ppb (200#'s total). Fluid loss was high. 288 Total Fluids Pumped PRUDHOE BAY, ALASKA TO: FROM: Well Name: Main Category: Sub Category: Operation Date: Anchorage PE's B. Rochin/R. Liddelow S-241 WIRELINE SDTRK 11/30/98 Date: 112-1-98 I S-24i SDTRK HES#1 SIP= 40# IA= 0# OAP= 400# WHT= S/I WHP= S/I RU. RIH W/TEL & 3.625" CENT. TAG CEMENT PLUG @ 9016' WLM. POOH. HAVE HB&R PUMP TBG UP TO 3000# WATCH FOR 30 MIN. BLED DOWN 150# IN 30 MIN. GOOD TEST RDMO SSSV/NO SUMMARY:PREP WELL FOR SDTRK,TAG CMT @ 9016' AND PRESS TEST TO 3000 FOR 30 MINS WITH 150 PSI DROP. Diesel Used [3 BBLS J Methanol Used [NONE I S-24i ~' SIDETRACK 11/30/98 ~~~ PREP PBU REPORTS GROUP 4P1200 .................... ,,.~,:~. :~:~,~ ~ .~ o~,o,~, ~ ~.~, ~.~ :~ ~ K. KRIEGER ~'~ ~'.:.'. ''~' ~ ~' :~ ~ ~ ~ TM '~ ~ ~~ 9335-070-735 JET CUT TUBING, IN THE MIDDLE OF A FULL JOINT, AT 4500'. MIRU SWS UNIT #3441, S. DECKERT. REQUEST RADIO SILENCE. PJSM. ARM CUTTER. RIH WITH 3-1/2" JET CUTTER. TIE IN TO SSSV LN AT 2195'. POSITION CUTTER AT 4512'. FIRE CUTTER. TENSION AND WHP CHANGE INDICATE CUTTER FIRED. POOH. CUTTER FIRED. RELEASE RADIO SILENCE. RDMO SWS. ~i~~®~;~ ..... ®~ JET CUT 4-1/2" TUBING AT 4512'; 22' FROM TOP OF JOINT. NO TD TAG. ~;~'~'~i':i ................. ~'?~;~:?~'=~'.:::.i"~~?':~?'~'~?~''?'''~':.~''%?:'~'~.~'%.%~ _ ........ ~ ~1~ ................... ~.,-. ~ ~ ................ IWHP- PSI'lAP= 0 CAP= 400 PSI ~,:~.~1 ...................... ~~..~ ............... ~:....~,~ 200 , PSI; JOB LOG: 11/30/98 1130 1300 1330 1350 1410 1430 1505 1510 1515 1545 1600 1700 MIRU SWS UNIT #3441, S. DECKERT. REQUEST RADIO SILENCE, NOTIFY PO AND N 7ES. PJSM. APPOINT JAMES DROVER SPILL PREVENTION CHAMPION. ARM JET CUTTER. CCL TO CUTTER = 15' RIH. TOOL STRING LENGTH = 17', MAX OD = 3-1/2". TIE-IN TO SSSV LN AT 2,195'. STOP AT 4550' LU TO 4497'. TOOL IN FIRING POSITION W/CCL AT 4497', CUTTER AT 4512'. WHP = 150#, IA = 0#. FIRE CUTTER. OBSERVE TENSION CHANGE, WHP = 200#, IA = 50# STILL CHANGING. LOG OFF CUT DEPTH. POOH. CCH LD TOOLS. CUTTER FIRED. RELEASE RADIO SILENCE. NOTIFY PO AND RIG. RDMO. FINAL WELL CONDITIONS: WELL SI; SIWHP = 400 PSI; lAP = 520 PSI; CAP = 400 PSI TOTAL FLUIDS PUMPED: NONE TOTAL DEPTH (E-line): NO TAG PRUDHOE BAY, ALASKA TO: FROM: WELL NAME: MAIN CATEGORY: SUB CATEGORY OPERATION DATE PE REPORT GROUP STJOHN/YEAGER IS-24 SIDETRACK WELL CIRC 12/01/98 OPERATION:WELL CIRCULATION INITIAL PRESSURES, WHP= 350 PSIG, IAP= 500 PSIG, DATE: 112/01/98 OAP= 350 PSIG. Time WHP lAP CAP Fluid BPM Total COMMENTS 1136 3000 500 350 MEOH 0 0 SAFTEY MEETING, PT LINES 1143 450 450 350 SW I 0 START DOWN TUBING 1146 800 450 350 SW 5 10 1203 600 200 350 SW 5 100 1243 680 200 350 SW 5 300 1317 740 0 350 SW 5 469 SHUT DOWN WITH SW. 1318 400 0 350 DSL 3 0 START WITH DIESEL 1331 1000 0 350 DSL 5 60 1354 725 0 350 DSL 5 150 SHUTDOWN DSL, VAC OUT LINES, RIG DOWN Final Pressures: WHP= 0 PSIG, IAP= 0 PSIG, OAP= 350 PSIG. Fluid Summary: 465 BBLS SW, 150 BBLS DSL CONCLUSION: S-24 WELL CIRCULATED WITH SEAWATER, AND U-TUBED WITH DIESEL TO FREEZE PROTECT TO 2,000', FLOWLINE WAS FREEZE PROTECTED PRUDHOE BAY, ALASKA TO: FROM: WELL NAME: MAIN CATEGORY: SUB CATEGORY OPERATION DATE P.E. REPORT GROUP ROMBERG / REA IS-24 SIDETR C.I.T. 12J02/98 DATE: 2/02/98 OPERATION: P/T IA TO 3000 # FOR UPCOMING SIDETRACK INITIAL PRESSURES: SIWHP=0 TEMP=S/I IA=0 OA=350 1500: MIRU HB&R, HELD SAFETY MEETING, P/T LINE TO 3500g Time lAP OAP Fluid BPM Total COMMENTS Type Bbl's 1504 0 350 DSL .3 0 START DOWN IA 1510 3000 350 " 1.8 7 STOP PUMPING, START 30 MIN TEST 1540 2950 350 " 0 LOST 50# GOOD TEST. BLEED BACKTO ZERO. R/D 1600 0 350 BLEED OA DOWN TO 100 # Final Pressures WHP=0 TEMP=S/I IA=0 OA= 100 Fluid Summary: PUMPED 7 BBLS OF DIESEL CONCLUSION: S-24 PASSED CIT ON IA, TUBING AND CEMENT PLUG. TESTED TO 3,000 PSI FOR 30 MIN. ONLY LOST 50# IN 30 MINS Facility PBS Pad Date/Time 07 Aug 99 04:30-06:00 04:30-05:00 05:00 05:00-06:00 Duration 1-1/2 hr 1/2 hr 1 hr 5 hr 5 hr 06:00-11:00 06:00-11:00 1-1/2 hr 1-1/2 hr 11:00 1 hr lhr 11:00-12:30 11:00-12:30 3 hr 1/2 hr 08 Aug 99 01:30 12:30 12:30-13:30 12:30-13:30 2-1/2 hr 13:30 13:30-16:30 13:30-14:00 3 hr 1 hr 14:00 14:00-16:30 16:30 16:30-19:30 16:30-17:30 Progress Report 17:30 17:30-19:30 19:30 19:30-21:30 19:30-21:30 21:30 21:30-02:00 21:30-01:30 2 hr 2 hr 2 hr 4-1/2 hr 4 hr Well S-24A Page Rig Nabors 9ES Date 1 08 September 99 Activity Move rig Held safety meeting Completed operations Rig moved 10.00 % Level and spot matting boards at cellar location. Lay Herculite. Spot sub, mud pits and shop. Set cuttings tank. Berm containment under rig and hook up lines. Move rig (cont...) Rig moved 100.00 % (cont...) Level and spot matting boards at cellar location. Lay Herculite. Spot sub, mud pits and shop. Set cuttings tank. Berm containment under rig and hook up lines. At well location - Cellar Rig accepted at 1100 hrs 8/7/99. Fluid system Fill pits with Fresh water Fill pits. R/U secondary annular valve on casing spool and hook up lines to circ freeze protect from well. Completed operations Wellhead work Removed Hanger plug Pulled BPV w/lubricator. Equipment work completed Fluid system Held safety meeting Held pre-spud meeting. Completed operations Circulated at 4512.0 ft Finished R/U and circulated freeze protect diesel from well. Hole displaced with Fresh water - 100.00 % displaced Wellhead work Installed Hanger plug Set TWC and tested to 1000 psi from below. Tested tree to 5000 psi. Equipment work completed Removed Xmas tree N/D tree and adapter. Function lock down screws on tubing hanger. Equipment work completed Nipple up BOP stack Installed BOP stack Equipment work completed Test well control equipment Tested BOP stack R/U and tested BOP's. Hydril 250/3500 psi. Pipe rams, blind rams, choke and kill line valves, floor safety valves, choke to 250/4000 psi. Unable to complete test on lower pipe rams, xo in way. Test witnessed by C. Scheve, AOGCC. Pressure test completed successfully - 4000.000 psi Facility Date/Time PBS Pad Progress Report 01:30-02:00 02:00 02:00-06:00 02:00-03:00 Well S-24A Page 2 Rig Nabors 9ES Date 08 September 99 03:00 03:00-06:00 06:00 06:00-06:30 06:00-06:30 06:30 06:30-08:00 06:30-07:30 07:30 07:30-08:00 08:00 08:00-14:30 08:00-10:30 10:30 10:30-11:00 11:00 11:00-13:00 13:00 13:00-14:30 14:30 14:30-15:30 14:30-15:30 15:30 15:30-03:30 15:30-17:30 17:30 17:30-18:30 18:30 18:30-23:00 23:00 23:00-01:00 Duration 1/2 hr 4 hr 1 hr 3 hr 1/2 hr 1/2 hr 1-1/2 hr 1 hr 1/2 hr 6-1/2 hr 2-1/2 hr 1/2 hr 2 hr 1-1/2 hr 1 hr 1 hr 12hr 2 hr 1 hr 4-1/2 hr 2 hr Activity Retrieved Hanger plug Equipment work completed Pull Single completion, 4-1/2in O.D. Pulled Tubing on retrieval string to 24.0 fi M/U landing jt and BOLDS. Pulled tubing to floor. L/D landing jt and tubing hanger. Completed operations Laid down 4512.0 ft of Tubing L/D tubing at report time. Installing thread protectors to salvage tubing. 107 joints laid out Recovered 107 jts tbg plus XN nipple plus 20.50' cut jt. Pull Single completion, 4-1/2in O.D. (cont...) Removed Tubing handling equipment Equipment work completed Test well control equipment Tested Bottom ram P/U test jt and tested lower pipe ram to 250/4000 psi. R/D equipment. Pressure test completed successfully - 4000.000 psi Installed Wear bushing Eqpt. work completed, running tool retrieved 4-1/2in. Drillpipe workstring run Ran Drillpipe in stands to 3020.0 fi P/U EZSV bridge plug and RIH. At Setting depth: 3020.0 fi Installed Bridge plug Set and released form EZSV. Set 25K down to confirm set. Equipment work completed Circulated at 3020.0 ft Pump 30 bbls water spacer and displaced to 9.6 ppg mud. 10 bpm, 375 psi. Mixed and spotted 18 ppg milling pill to 2820'. Hole displaced with Water based mud - 100.00 % displaced Pulled Drillpipe in stands to 0.0 ft At Surface: 0.0 ft Planned maintenance Serviced Block line Line slipped and cut BHA run no. 1 Made up BHA no. 1 P/U section milling BHA. BHA no. 1 made up R.I.H. to 2799.0 ft Locate casing collar at 2799. Stopped: To correlate depth Milled Casing at 2794.0 fl P/U 6' above collar and begin section milling @ 2794'. Milled to 2797'. Recovered 150//metal. At Kick off depth: 2797.0 ft Circulated at 2797.0 ft Mix and pump sweep. Circ 14 bpm, 1325 psi. Facility PBS Pad Date/Time 09 Aug 99 01:00 01:00-02:00 02:00 02:00-03:30 Duration 1 hr 1-1/2 hr 1 hr 1 hr 03:30 03:30-04:30 03:30-04:30 1-1/2 hr 1/2 hr 04:30 04:30-06:00 04:30-05:00 1 hr 05:00 05:00-06:00 1 hr 05:00-06:00 06:00-08:00 06:00-08:00 08:00 08:00-10:00 08:00-10:00 10:00 10:00-11:00 10:00-11:00 11:00 11:00-13:30 11:00-13:30 13:30 13:30-14:30 13:30-14:00 14:00 14:00-14:30 14:30 14:30-15:30 14:30-15:00 Progress Report Well S-24A Page Rig Nabors 9ES Date 2 hr 2 hr 2 hr 2 hr 1 hr 1 hr 2-1/2 hr 2-1/2 hr 1 hr 1/2 hr 1/2 hr 1 hr 1/2 hr 3 08 September 99 Activity Hole swept with slug - 400.00 % hole volume Pulled out of hole to 673.0 ft At BHA Pulled BHA Stand back HWDP and DC's. L/D jars and section mill. BHA Stood back Fluid system Circulated at 26.0 ft R/U and circ to clean stack. Attempted to circulate thru 13-3/8" annulus, pressure to 400 psi, 12.5 ppg EMW, no circulation. Stopped: To change handling equipment Wellhead work Removed Wear bushing Equipment work completed Removed Seal assembly Pulling 9-5/8" packoff at report time. Removed Seal assembly Pull 9-5/8" packoff thru stack. Packoff damaged, had to modify running tool. Recovered packoff. Wellhead work (cont...) Removed Seal assembly (cont...) Pull 9-5/8" packoff thru stack. Packoff damaged, had to modify running tool. Recovered packoff. Equipment work completed Pull Casing, 9-5/8in O.D. Pulled Casing on retrieval string to 25.0 ft PFLI 9-5/8" spear and packoff assembly. Catch casing below hanger. Worked pipe to 350K, 400 psi on pump. 2' pipe movement at surface, no circulation. Stopped: To flowcheck well Well control Flow check Gas breaking out of crude/diesel freeze protect in annulus. Closed annular and took gas expansion to gas buster. Well unloaded 37 bbls fluid. No shut in pressure. Lubricate well, took 37 bbls to fill. Observed well static Pull Casing, 9-5/8in O.D. Worked stuck pipe at 2797.0 ft Work pipe to 400K. Pressure to 600 psi attempting to bread circulation. Unable to free casing. Release spear. Aborted attempts to work Casing free at 2797.0 ft Wellhead work Installed Seal assembly Eqpt. work completed, running tool retrieved Installed Wear bushing Eqpt. work completed, running tool retrieved Fluid system Reverse circulated at 2797.0 ft Attempted to circulate down casing annulus. r, .... : .... Ol-'m, ot,u ps · u.l~,..~ away at 2 k__ l-,nn i. ,,ux'- returns up n~,__,,octo,, Facility Date/Time 10 Aug 99 Progress Report PBS Pad Well S-24A Page 4 Rig Nabors 9ES Date 08 September 99 15:00 15:00-15:30 15:30 15:30-21:00 15:30-16:00 16:00 16:00-17:00 17:00 17:00-18:00 18:00 18:00-19:30 19:30 19:30-20:30 20:30 20:30-21:00 21:00 21:00-21:30 21:00-21:30 21:30 21:30-23:00 21:30-23:00 23:00 23:00-23:30 23:00-23:30 23:30 23:30-06:00 23:30-00:30 00:30 00:30-03:00 03:00 03:00-03:30 03:30 03:30-06:00 03:30-06:00 06:00-13:00 Duration 1/2 hr 5-1/2 hr 1/2 hr 1 hr 1 hr 1-1/2 hr 1 hr 1/2 hr 1/2 hr 1/2 hr 1-1/2hr 1-1/2 hr 1/2 hr 1/2 hr 6-1/2 hr 1 hr 2-1/2 hr 1/2 hr 2-1/2 hr 2-1/2 hr 7 hr Activity casing. Stopped: To hold safety meeting Held safety meeting Held Technical Limit/Safety Meeting with T. Bunch and D. Abert. Completed operations BHA run no. 2 Made up BHA no. 2 P/U hydraulic multicutter tool. BHA no. 2 made up R.I.H. to 2659.0 ft At 13-3/8in casing shoe To cutting point 10' above 13-3/8" casing shoe. Cut Casing at 2659.0 ft Cut casing with multicutter. Completed operations Circulated at 2659.0 ft Open 13-3/8" annular valve and allow 9.6 ppg mud to U-tube crude/diesel freeze protect to outside tank. Recovered 100 bbls freeze protect. Hole displaced with Water based mud - 100.00 % displaced Sfl to allow oil/gas/mud mixture to separate. Pulled out of hole to 654.4 ft At BHA Pulled BHA L/D casing cutter. BHA Stood back Wellhead work Removed Wear bushing Equipment work completed Fluid system Circulated at 2659.0 ft Closed blind rams and circulated thru cut in 9-5/8" casing. Obtained bottoms up (100% annulus volume) Wellhead work Retrieved Seal assembly Pulled 9-5/8" packoff. Equipment work completed Pull Casing, 9-5/8in O.D. Pulled Casing on retrieval string to 40.0 ft RIH. Latch casing w/spear. Pulled to floor, 145K. Released spear. Fish at surface Rigged up Casing handling equipment Equipment work completed Circulated at 2659.0 ft Pump pill. Heavy slug spotted downhole Laid down Casing of 1200.0 ft Lay down 9-5/8" casing at report time. Laid down Casing of 1200.0 ft L/D 9-5/8" casing. Recovered 67 jts + 15' cutjt. Recovered 11 turbulators. Pull Casing, 9-5/8in O.D. (cont...) Facility Date/Time 11 Aug 99 Progress Report PBS Pad Well S-24A Rig Nabors 9ES Page 5 Date 08 September 99 06:00-11:00 11:00 11:00-13:00 13:00 13:00-22:00 13:00-14:30 14:30 14:30-15:30 15:30 15:30-17:30 17:30 17:30-19:30 19:30 19:30-20:30 20:30 20:30-21 '30 21:30 21:30-22:00 22:00 22:00-22:30 22:00-22:30 22:30 22:30-23:00 22:30-23:00 23:00 23:00-06:00 23:00-00:30 00:30 00:30-01:30 01:30 01:30-06:00 01:30-06:00 06:00-04:30 06:00-16:30 16:30 16:30-17:30 17:30 Duration 5 hr 2 hr 9 hr 1-1/2 hr 1 hr 2 hr 2 hr 1 hr 1 hr 1/2 hr 1/2 hr 1/2 hr 1/2 hr 1/2 hr 7 hr 1-1/2 hr 1 hr 4-1/2 hr 4-1/2 hr 22-1/2 hr 10-1/2 hr 1 hr Activity Laid down 2659.0 ft of Casing (cont...) L/D 9-5/8" casing. Recovered 67jts + 15' cutjt. Recovered 11 turbulators. 67 joints laid out Rigged down Casing handling equipment R/D and clean rig floor. Equipment work completed BHA run no. 3 Made up BHA no. 3 Fishing BHA, spear. B HA no. 3 made up R.I.H. to 2659.0 ft At Top of fish: 2659.0 ft Fished at 2659.0 ft Latched fish. Jarred 225K to 275K. Attempted to pump. No-go. Good jarring action. Released fish Abandoned effort to pull fish free. Serviced Top drive Inspected derrick and top drive. Repaired sheared bolts in top drive cover plate. Equipment work completed Pulled out of hole to 700.0 ft At BHA Pulled BHA L/D fishing spear, bumper sub, accelerator jars. BHA Stood back Removed Drillfloor / Derrick Clear floor, P/U Baker tools. Equipment work completed Planned maintenance Serviced Top drive Equipment work completed Wellhead work Installed Wear bushing Eqpt. work completed, running tool retrieved BHA run no. 4 Made up BHA no. 4 Milling BHA. BHA no. 4 made up R.I.H. to 2659.0 ft At Top of fish: 2659.0 ft Milled Casing at 2670.0 ft Milling ahead, 4.5'/hr. 2670' at report time. Milled Casing at 2670.0 ft Milled casing to 2726'. S/D to make a connection. BHA run no. 4 (cont...) Milled Casing at 2726.0 fl (cont...) Milled casing to 2726'. S/D to make a connection. Began precautionary measures Investigated pressure change Wad of mill cuttings backing up flowline and bell nipple. Clean same. Completed operations Facility Date/Time 12 Aug 99 PBS Pad Progress Report Well S-24A Page Rig Nabors 9ES Date 6 08 September 99 17:30-20:00 20:00 20:00-20:30 20:30 20:30-23:30 23:30 23:30-02:00 02:00 02:00-03:00 03:00 03:00-04:30 04:30 04:30-06:00 04:30-05:30 05:30 05:30-06:00 06:00 06:00-09:15 06:00-08:00 08:00 08:00-08:15 08:15 08:15-08:30 08:30 08:30-09:00 09:00 09:00-09:15 09:15 09:15-10:00 09:15-10:00 10:00 10:00-13:00 10:00-10:30 10:30 10:30-12:00 Duration 2-1/2 hr 1/2 hr 3 hr 2-1/2 hr 1 hr 1-1/2 hr 1-1/2 hr 1 hr 1/2 hr 3-1/4 hr 2 hr 1/4 hr 1/4 hr 1/2 hr 1/4 hr 3/4 hr 3/4 hr 3 hr 1/2 hr 1-1/2 hr Activity Milled Casing at 2739.0 ft Finished milling 70' window for kick off. At Window: 2739.0 ft Circulated at 2739.0 ft Circulate sweep. Flowline plugged off before sweep returns. Stopped: To service drilling equipment Rigged down Flowline Break flowline apart and unplug flowline. Cuttings ball plugging flowline. Equipment work completed Circulated at 2739.0 ft Obtained clean returns - 400.00 % hole volume Pump sweeps, clean metal from hole. Pulled out of hole to 672.0 ft At BHA Pulled B HA L/D mills. 20% wear on mill. BHA Stood back 4in. Drillpipe workstring run Ran Drillpipe in stands to 2669.0 ft RIH w/muleshoe. At 13-5/8in casing shoe Washed to 2820.0 ft Wash to 2820' at report time. (Top of 18 ppg pill.) At Setting depth: 2820.0 ft Bottom of cement plug. 4in. Drillpipe workstring run (cont...) Circulated at 2820.0 ft Hole swept with slug - 200.00 % hole volume Pulled Drillpipe in stands to 2615.0 ft At top of check trip interval Ran Drillpipe in stands to 2820.0 ft No resistance. Stopped: To circulate Circulated at 2820.0 ft Stopped: To hold safety meeting Held safety meeting Held PJSM w/Dowell. Completed operations Cement: Kickoff plug Mixed and pumped slurry - 65.000 bbl Pump 5 bbls H20. Test lines to 3000 psi. Pump 35 bbls H20, 65 bbls cmt, 3 bbls H20. Displace with 17.5 bbls 9.6 ppg mud. Cement pumped CIP 1000 hrs 8/12/99. 4in. Drillpipe workstring run Pulled Drillpipe in stands to 2150.0 fl Stopped: To circulate Circulated at 2150.0 ft Circulate and clean hole. Got 2 bbls cmt contaminated mud to surface. Facility Date/Time 13 Aug 99 PBS Pad Progress Report Well S-24A Page Rig Nabors 9ES Date 7 08 September 99 12:00 12:00-13:00 13:00 13:00-14:30 13:00-13:30 13:30 13:30-14:00 14:00 14:00-14:30 14:30 14:30-17:00 14:30-15:00 15:00 15:00-17:00 17:00 17:00-06:00 17:00-19:00 19:00 19:00-20:00 20:00 20:00-20:30 20:30 20:30-22:30 22:30 22:30-23:00 23:00 23:00-06:00 06:00-12:00 06:00-07:00 07:00 07:00-10:00 10:00 10:00-11:00 11:00 11:00-12:00 12:00 12:00-18:00 12:00-17:00 17:00 17:00-18:00 Duration 1 hr 1-1/2 hr 1/2 hr 1/2 hr 1/2 hr 2-1/2 hr 1/2 hr 2 hr 13hr 2 hr 1 hr 1/2 hr 2 hr 1/2 hr 7 hr 6 hr 1 hr 3 hr 1 hr 1 hr 6 hr 5 hr 1 hr Activity Obtained clean returns - 150.00 % hole volume Pulled Drillpipe in stands to 0.0 ft Pump pill and POH. L/D muleshoe. At Surface: 0.0 ft Wellhead work Removed Wear bushing Equipment work completed Circulated at 25.0 ft Washed stack with perforated joint. Functioned BOP's. Stopped: To service drilling equipment Installed Wear bushing Eqpt. work completed, running tool retrieved Planned maintenance Serviced Drillfloor ! Derrick Cleared and cleaned rig floor. Equipment work completed Serviced Rotary table Level rig. Settling moved rig off center. Equipment work completed BHA run no. 5 Made up BHA no. 5 BHA no. 5 made up R.I.H. to 2364.0 ft RIH to 2100'. Washed to 2364', TOC. Observed 20.00 klb resistance Drilled cement to 2397.0 ft Stopped to test casing Circulated at 2397.0 ft Obtained clean returns - 150.00 % hole volume Cement contaminated mud. Tested Casing - Via annulus Tested 13-3/8" casing to 2500 psi for 30 min, bled off 178 psi, OK. Pressure test completed successfully - 2500.000 psi Drilled cement to 2610.0 ft Drilling hard cement. (Very hard) 30K wob, 100 rpm, 650 gpm. Drilling cement at report time. BHA run no. 5 (cont...) Drilled cement to 2669.0 ft Finished drill cement to 13-3/8" csg shoe. Completed operations Circulated at 2669.0 ft Circ and cond cement contaminated mud. Obtained clean returns - 300.00 % hole volume Pulled out of hole to 932.0 ft At BHA Pulled BHA L/D steel DC's, stood back HWDP. BHA Laid out BHA run no. 6 Made up BHA no. 6 BHA no. 6 made up R.I.H. to 2400.0 ft Facility Date/Time i iiiii PBS Pad 18:00 18:00-19:00 18:00-18:30 18:30 18:30-19:00 19:00 19:00-06:00 19:00-22:00 22:00 22:00-03:00 14 Aug 99 03:00 03:00-04:30 04:30 04:30-05:00 05:00 05:00-06:00 06:00-06:00 06:00-06:30 06:30 06:30-08:00 Duration 1 hr 1/2 hr 1/2 hr llhr 3 hr 5 hr 1-1/2 hr 1/2 hr 1 hr 24hr 1/2 hr 1-1/2 hr 08:00 08:00-09:00 09:00 09:00-10:00 10:00 10:00-11:00 1 hr 1 hr 1 hr 11:00 11:00-21:00 lOhr 21:00 21:00-22:00 Progress Report Well S-24A Page Rig Nabors 9ES Date 22:00 22:00-23:00 23:00 23:00-00:30 1 hr 1 hr 1-1/2 hr 8 08 September 99 Activity Began precautionary measures Planned maintenance Serviced Block line Line slipped Serviced Top drive Equipment work completed BHA run no. 6 Rigged up Logging/braided cable equipment Held PJSM. R/U Schlumberber wireline sheave and side entry sub. RIH w! gyro and latch up. Equipment work completed Drilled to 2745.0 ft Time drilled to 2745' kicking off cement plug. Build rate unacceptable - Unable to orientate string POH w/wireline to rotate. Removed Logging/braided cable equipment POH and R/D Schlumberger/Gyrodata. Equipment work completed Drilled to 2775.0 ft Rotate 30'. Build rate unacceptable - Unable to orientate string Planned rotation. Rigged up Logging/braided cable equipment R/U Schlumberger and Gyrodata. RIH. Prepare to slide ahead. BHA run no. 6 (cont...) Drilled to 2815.0 ft Slide from 2775' to 2815'. Reached planned end of run - Directional objective met Rigged down Survey wireline unit POH w/wireline and stand back Schlumberger. Equipment work completed Drilled to 2904.0 ft L/D side entry sub. Drilled ahead to 2904'. Stopped · To take survey Rigged up Survey wireline unit R/U Schlumberger and ran gyro. Equipment work completed Rigged down Survey wireline unit RID and released Schlumberger and Gyrodata. Work completed, equipment laid out Drilled to 3745.0 ft Drilled ahead sliding as required for angle and direction. AST=5.5 hrs ART=3.0 hrs Began precautionary measures Circulated at 3745.0 ft Circulated sweep. Obtained clean returns - 100.00 % hole volume Pulled out of hole to 2600.0 ft Hole swabbing, backream as necessary. At top of check trip interval R.I.H. to 3373.0 ft RIH. Tight at 3373'. Appeared to be pushing boulder downhole. Hung up in slide interval at 3373'. ,-,_: ......, .............. ,_ ,~. .... :4 ..... '---' high UllUllt {lllLl flttCllll~/t t~J W~t311 UllU. OIUCtI~ICl~CU Alaska hared · ervlces riiling WELL NAME S-24~ DRILLING PERMIT/SUNDRY/PRE-RIG COVER SHEET IThe attached work cannot commence without obtaining the required signatures in I the "APPROVAL TO PROCEED" section at the bottom of this cover sheet. I "APPROVAL TO PROCEED" will signify AOGCC approval has been received. This cover sheet is applicable to: (only one category per cover sheet) ['"] DRILLING PERMIT D Permit Documentation Prepared: ODE: Date: D Permit Application Reviewed: SDE/ES: Date: D Permit Application Submitted: TA: D ate: [~] PRE-RIG WORK Pre-Rig Memo Reviewed: SDE/ES: Pre-Rig Memo Sent to Slope: ODE: Date: Date: Pre-Rig Sundry Documentation Prepared: ODE: Pre-Rig Sundry Applicat~Reviewed: SDE/ES: ~--------~--9-..',"'>.~ Date: Pre-Rig Sundry Application Submitted: SUNDRY NOTICE D Sundry Documentation Prepared: ODE: Date: D Sundry Application Reviewed: SDE/ES' Date: D Sundry Application Submitted: TA: D ate: NOTE: IF SUNDRY IS FOR PRE-RIG WORK~ USE PRE-RIG WORK SECTION AT BELOW LEFT AND CHECK "ABANDON" BOX BELOW Reason for Sundry (Check all that apply) Abandon Alter Casing Suspend Repair Well Plugging Pull Tubing Variance Other(Explain): Change Approved Program Operation Shutdown Re-enter Su~~e[1V E Time Extension Perforate N 0 V Stimulate ~aska Oil & (las Cons. commi AncJ~orafl,e sion I APPROVAL TO PROCEED I Approved AOGCC Permit/Sundry Received TA: Date: Approval to Commence Operations SDE/ES: Date: STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVAL 1. Type of Request: [] Abandon [] Suspend [] Plugging [] Time Extension [] Perforate [] Alter Casing [] Repair Well [] Pull Tubing [] Variance [] Other [] Change Approved Program [] Operation Shutdown [] Re-Enter Suspended Well [] Stimulate Plug Back for Sidetrack 2. Name of Operator BP Exploration (Alaska)Inc. 3. Address P.O. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 1633' SNL, 4228' WEL, SEC. 35, T12N, R12E, UPM At top of productive interval 4572' SNL, 1500' WEL, SEC. 26, T12N, R12E, UPM At effective depth 4550' SNL, 1440' WEL, SEC. 26, T12N, R12E, UPM At total depth 4483' SNL, 1289' WEL, SEC. 26, T12N, R12E, UPM 5. Type of well: E~ Development [~] Exploratory [~] Stratigraphic [~ Service 6. Datum Elevation (DF or KB) KBE - 66.25' 7. Unit or Property Name Prudhoe Bay Unit 8. Well Number S-24 9. Permit Number 90-55 10. APl Number 50-029-22044 11. Field and Pool Prudhoe Bay Field / Prudhoe Bay Pool 12. Present well condition summary Total depth: measured 10428 feet true vertical 9311 feet Effective depth: measured 10017 feet true vertical 8961 feet Casing Length Size Structural Conductor 110' 20" Surface 2639' 13-3/8" Intermediate 9804' 9-5/8" Production Liner 838' 7" Plugs (measured) Junk (measured) Perf assembly fish @ 10183' (05/92); Fill on top of fish @ 10112' f01/91) Cemented 2580 c.f. Arcticset II & III 2040 c.f. Class 'G' 258 c.f. Class 'G' MD TVD BKB 139' 139' 2668' 2668' 9843' 8816' Perforation depth: measured 9991 '-10040', 10050'-10086', 10099'-10132' true vertical Subsea 8873'-8992' (three intervals) Tubing (size, grade, and measured depth) 9590'-10428' 8610'-9311' 4-1/2", L-80, 12.6# with tailpipe to 9646' RECEIVED Nask~ Oil & Gas Cons. Commi', Anchorage, Packers and SSSV (type and measured depth) 4-1/2" SSSV at 2102'; 7" Otis WD Packer with tailpipe at 9957'; 9-5/8" Baker Packer at 9560' 13. Attachments [~ Description summary of proposal 1--] Detailed operations program 1--] BOP sketch 4. Estimated date for commencing operation November 27, 1998 16. If proposal was verbally approved Name of approver Date approved Contact Engineer Name/Number: C. Michael Jackson, '564-5480 15. Status of well classifications as: 1~ Oil [~] Gas [~ Suspended Service Water Injection Prepared By Name/Number: Kathy Campoamor, 564-5122 17. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed ~,_..~,,~. ~ Dan Stone Title Engineering Supervisor Commission Use Only Date [Approval [ 3ond. i~k~ ~proval: Notify Commission so representative may witness --- ¢~'~,~ ~eG~,t~ Plug integrity ~ BOP Test ~ Location clearance [ ~" ~. ~%-~ ..... Mechanical Integrity Test Subsequent form required 10- ~, ~ ~ [~:~ Original Sign~su [Approved by order of the Commission Davi~ W. d0h/',~;~0; Commissioner Date Form 10-403 Rev. 06/15/88 Submit In Triplicate TBEE: 4" ctw s-24' WELLHEAD: McEVOY BF. ELEV = 37,05' ACTUATOR: BAKER Cl¢lT'd I KOP: 2900' o MAX ANGLE: 38 @ 9400' t 2195' No Gas Lift Mandrels TUBING CAPACITY: 0.0152 BBL/FT TUBING ID: 3,958" Tubing Cut 9508' 7" 9629' LINER Minimum Top of Cement REF LOG: ATLAS - BHCA - 5-7-90 SIZE SPF_ INTERVAL OPEN/SQZ'D 3 318" 4 9834' - 9884' OPEN~ePed PBTD T', 26 #/ft, L-B0, BUTT DATE :{NV. BY 5-10-90 FKB 10,428' ] -- COMMENTS ~BiNG INSERT SET IBP/CARBOLITE 4-1/2'~ HES X NIPPLE 3,813" 9-5/8" TiW PACKER (HBBP-T)(3.93" ID) 4-1/2" HES X NIPPLE 3.813" 4-1/2'~ WLEG 9641' MARKER JOINT 7" OTIS "WU" ~1~ ~, NIPPLE ) (3.813" ID) 4-1/2" "XN" NIPPLE OTIS) (3.725" ID) 973f 9945' 9953' 995T 9959' 9961' 4-112" GUN RELEASE ( 5.218" OD) (3,94" ID) NOTEi 3" FLOWLINE IN SKID POBTIONS OF THIS WELLIS FLOWLINE ARE 3" AND SUBJECT TO EROSION, THE GO SHOULD BE NOTIFIED OF ANY WELL OPERATION WHICH COULD IN -ASE THE FLOW OR WELL 524-90 LENGTH IS 171.75'. TOP PRUID" - -- WELl_: S-24 (45-27-12-12) APl NO: 50-029-22044 SEC 35: TN 12 N: I:~,,RGE BP EXPLORATION R¥~C, DOYON B6, Perf 9834- I TREE: 4" CIW S 24 ...~.~v:~.~, WELLHEAD: McEVOY ~ BF. ELEV = 37.05' ACTUATOR: BAKER ! O 4-1/2"HESXNIPPLE3.81S"IE~ 2195' CMT'd w i ~ NO CONTROL LINES L-80, BTRS I KOP: 2900' MAX ANGLE: 38° @ 9400' No Gas Lift Mandrels ! 4-1/2", 12.6#/ft, L-80 I TUBING TUBING ID: 3.958" LCAPAC TY: 0.0152 BBL/FT ~ I~ (HBBP-T)(3.93" ID) 7" LINER 2 I I ~ 4-1/2" HES X NIPPLE 3.813" ID 9629' · 4-1/2" WLEG 9641' 9-5/8", 47#/ft, ,.80, NSCC I 9843' l__i~ 4'1/2" ELMD I 0641' i i MARKER JOINT J 9731' m~ 4-1/2 .... X" NIPPLE ~""' 4 1/2 .... XN" NIPPLE REF LOG: ATLAS-BHCA- 5-7-90 I ! .,,,~(/'- ~';'lS) (3.725" ID) [ 9957' ~IzE SPF "INTERVAL' oPEN/~QZ'D ! I 3 3/8" 4 9834'- 9884' OPEN/RePerf 5" 4 ! 9991 - 10,040' OPEN/5-24-90 ~ "'~ 9959' 5" 4 ! 10,050-10,086 ..... E~ % 5" 4 10,099 10,132' ..... 4-1/2" GUN RELEASE I I I ~(5.218" 0D) (3.94" ID) I 9961' , i i L::J NOTE: 3" FLOWLIN E ~'~ "~'1D'1 I PORTIONS OF THIS WELL'S ! FLOWLINE ARE 3" AND SUBJECT TO EROSION. THE GC SHOULD Z BE NOTIFIED OF ANY WELL OPERATION WHICH COULD INCREASE THE FLOW OR I EROSION RATES. PBTD I 10,386' I*,,,*~ FISH: TUBING CONVEYED PERFORATING. ',/,%/,',~,' ASSEMBLY LEFT IN WELL 5-24-90. 7", 26 #/ft, L-80, BUTT I 10,428' I ........ LENGTH IS 171.75'. TOP AT 10,183' WLM. DATE REV. BY COMMENTS PRUDHOE BAY UNIT 5-10-90 FKB INITIAL COMPLETION WELL: S-24 (45-27-12-12) 9-21-93 MANESS SET 4" REDUCING INSERT APl NO: 50-029-22044 lO/O/95 RLV SET IBP/CARBOLITE PLUG ,, SEC 35; TN 12 N; 12 RGI= 10/17/95 M. LINDER RWO DOYON 16 11/28/95 SGS Re Perf 9834-9884 BPEXPLORATION I ~lZE SPF "INTERVAL' OPEN/~QZ'D 3 3/8" 4 9834' - 9884' OPEN/RePerf 5" 4 9991 - 10,040' OPEN/5-24-90 5" 4 10,050 - 10,086 ..... 5" 4 10,099 - 10,132 ..... ared rvices rilling BP Exploration / ARCO Alaska Inc. To: cc: Blair Wondzell - AOGCC Cathy Campoamor - SSD Date: November 18, 1998 From: C. Michael Jackson Subject: S-24Ai Application for Sundry Permit The S-24Ai sidetrack is currently scheduled for Nabors 22E following the completion of S-11Ai. * Notify the field AOGCC representative with intent to plug and abandon * Pre-Riq Work: Perform a cement P&A of 15.8 ppg class 'G' cement with adequate cement volume to cover the 7" liner from PBTD at 10,385' to a minimum of 100' above the top perforation at 9834' plus squeeze 5 bbls to the perforations. Estimated cement volume needed is 30 barrels. A full bore P&A is recommended but is at the discretion of the Wells Group. There are no GLM's in the completion string. Note: Top of cement must be at a minimum of 9734' for AOGCC compliance. Top of cement may extend into the tubing as long as it does not interfere with the tubing cutting operations. 2. Rig up slickline, tag and document top of cement. 3. Cut the 4 1/2" L-80 tubing in the middle of a full joint of tubing at 4500'. This cut will not be fished and is at the discretion of the Wells Group as to chemical or jet cut. 4. Test the McEvoy 9-5/8" mandrel packoff and tubing hanger seals to 5000 psi for 30 minutes. 5. Test the casing against the cement plug to 3000 psi for 30 minutes. Freeze protect top 2200' MD with diesel. Ensure the cut is successful and communication exists between casing/tubing to avoid tubing collapse. 6. Bleed tubing and annuli pressures to zero. Set a BPV in the tubing hanger and test from below to 1000 psi. Secure well. 7. Remove the well house and flowlines. If necessary, level the pad. Please provide total well preparation cost on the handover form. Ri.q Operations: 10. 1. MIRU Nabors 7ES 2. Circulate out freeze protection. Set TWC. 3. Nipple down tree. Nipple up and test BOPE. 4. Pull 4-1/2" tubing. 5. Make up an 8.5" bridge plug on drill pipe and set at 4100'. 6. Weight test the bridge plug and pressure test the casing to 4000 psi for 30 minutes(injection well). 7. Displace the well to milling fluid and spot a 18 ppg pill from the bridge plug to the milled section. 8. RIH with 9-5/8" Baker section mill assembly and mill a 50' window from 3800' to 3850'. 9. RIH with a mule shoe to 100' below the base of the section and spot a 17 ppg balanced cement plug from 100' below the section to 200' above the section. Kick-off drilling the 8-1/2" intermediate section to TSag @ _+10,460' md(8663' TVD). Run and cement a 7", 26# intermediate liner with a minimum of 150' liner lap in the 9-5/8". Test the 7" and the 9-5/8" casing from the 7" landing collar to surface to 4000 psi for 30 minutes. 13. 14. 15, 16. 17. 18. 19. 20. 21. 22. 23. Drill the 6" production section building to horizontal targeting the Zone 4 sands(8813' TVD) to an estimated depth of 1,858' md(8993' TVD). Run DPC 'Platform Express' + Sonic logs from horizontal to 7" shoe· Run and fully cement a 4-1/2", 12.6# production liner with a minimum of 150' liner lap in the 7". Run a USIT / CBT on e-line as deep as possible logging the 4·5" and 7" cement bond for 1000' above the top of the 4·5" liner· Test the 4-1/2", 7" and 9-5/8" casing from the 4-1/2" landing collar to surface to 4000 psi for 30 minutes· The 4-1/2" production liner will be perforated with DPC 2.75" guns on a 400 psi under balance. Perforating intervals to be determined after reviewing logs. Run 4-1/2" NSCT L-80 completion tying into the 4-1/2" liner. Test the tubing to 4000 psi and annulus to 4000 psi for 30 minutes with 2500 psi on the tubing. Nipple down the BOPE. Nipple up and test the tree to 5000 psi. Freeze protect the well to -2200' and secure the well. Rig down and move off. Estimated Pre-rig Start Date: 11/27/98 Estimated Spud Date: 12/04/98 · ic aelJackson Operations Drilling Engineer 564-5486 11/18/98 ANNULAR INJECTION DATA ENTRY SCREEN A s s e t .WOA. ......................................... Rig Name .blab~r.s.2_SE ........................... Inj Well Name',S~.'~'i. ...................................... Permit Start ..... .1.2./...0,Z9.5 ..... Sur Csg Dep 2.7.5.0. .............. · .............................. Cumulative Data Legal Desc .1J~;~3.'.SI~L..,42.2R'.~LEL,..,S. ec..35.,.T..12N,...B.1.2.E ..................... Research ........................................................................................................................ CQ r~e cted..c, op y...s e. rzt ..t~..AQGC.C,..2:2~.:,gZ ............... Permit End ..... J.2./.~./.g..6 ..... Rig Completion Format on Intermittant Final Well Total Mud/Ctq Wash Fluids Fluids Freeze . '.: Freeze iSource ,:Mud, Ctgs, Cmi i Date of i contaminated i Rig Wash Well i: injection i Dr!g Mud ! Fluids ~ .~i. ,_ .8._8_.!. .................... ' 420 S-05A 12/09/95 .~.:..0_._s..~ ...... S-05A 12/11/95 45 102 S-05A S-05A S-05A S-05A Daily Data ~ Intermittant i Final Completion! Formation Freeze' Freeze · Fluids ..: Fuds I protect On Protection · · i Annulus i : Rate· I.~ Pressurei Status i Comments Complications 12/12/95 i193 12/13/95 ~ 25O 219 12/14/95 115 12/15/95 201 12/16/95 12/17/95 130 j78 .. i12/18/95 166 !208 1~ 66 1990 & 1992 Year End 112/19/95 '12/21/95 120 'I--, '. '. 120 j12/22/95 470 .20 I { i ,490 12/23/95 !32 , 132 S-05A {12/24/95 733 'i145 S-05A ~12/25/95 181 '~-~'~-~-~ ....... ~-~-i-~'~-~-' ':(~ ............. ! ~-i-~ ......... i'~-~- .............. ~ ...................... 13 5 0 .~.5 A 1.1 2/28/9~-~~i .... 750 .... i75~ S-05A 12/29/95 { ~280 i 280 S-05A [12/30/95 [ i560 ~ !560 S-01B 01/02/96 ~735 i ~ ~735 ;S-01B iO 1/04/96 .417 ........... ~_¢_9 S-01B [01/06/96 541 '105 ,~646 S-01B ~0 1/07/96 68 80 ~ 148 S_:P ~_~_~_iPJ_(q.8./.~¢.._..8..~ ~ ............... i ~ ..................... 8.~.¢_ ............... S-01B O1/09/96 350 '- ...................... ~ .................... ~ ................ [ .................. 350 S-01B O1/10/96 295 ~ 295 S-0!B O1/11/96 187 , ~ ~ 187 S-01B O1/12/96 i S-01B 01/13/96 ~ S-01B O1/14/96 207 ~275 .~ 1..193 .~:_0_[~_~_l_0_~_/J 6~_6_ ) 45 S-01B .,~---~{O1/17/96 ............... 1423 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown Stimulate__ Plugging__ Pull tubing__ Alter casing __ Repair well X Perforate Other .... 2. Name of Operator BP Exploration 3. Address P. O. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 1633' SNL, 4228' WEL, SEC. 35. T12N, R 12E At top of productive interval 4572' SNL, 1500' WEL, SEC. 26, T12N, R12E At effective depth 4550'SNL, 1440' WEL, SEC. 26, T12N, R12E At total depth 4483' SNL, 1289' WEL, SEC. 26, T12N, R12E 5. Type of Well: Development Exploratory Stratigraphic Service ORIGINAL 6. Datum elevation (DF or KB) KBE = 66.25 AMSL feet 7. Unit or Property name Prudhoe Bay Unit 8. Well number S-24 9. Permit number/approval number 90-55 10. APl number 50- 029-22044 11. Field/Pool Prudhoe Bay Field~Oil Pool 12. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical Casing Length Structural -- Conductor 110' Surface 2639' Intermediate 9804' Production -- Liner 838' Perforation depth: measured 10428 feet Plugs (measured) 9311 feet BKB 10017 feet Junk (measured) 8961 feet BKB Size Cemented Measured depth 20" 139' 13-3/8" 2580 cu ft 2668' 9-5/8" 2040 cuft 9843' 7" 258 cu ft 9590'- 10428' 9834'-9884', 9991'- 10040', 10050'- 10086', 10099'- 10132' True vertical depth 139' 2668' 8816' 8610'-9311' true vertical 8809'- 8992' (four intervals) Tubing (size, grade, and measured depth) 4-1/2", 12.61t, L-80, NSCTto 9641' Packers and SSSV (type and measured depth) 9-5/8" TlW packer at 9519'; 7" Otis WD packer at 9945'; 4-1/2" HES 'X' nipple at 2195' 13. Stimulation or cement squeeze summary Intervals treated (measured) Treatment description including volumes used and final pressure 14. RI:LI:IV tD Al~.~ka 0it & Gas Cons. {;ct~-t,'lrtlt~i0ft Representative Daily Average Production or Injection Da-ta Ancl]or~§e OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation Subsequent to operation 15. Attachments 16. Status of well classification as: Copies of Logs and Surveys run Daily Report of~ll Operations X Oil__ Gas Suspended 17. I hereby cert~ th~the foregoi~ t,~e/~/d'correct to the best of my knowledge. Signed ~../~//~'c.,~~' Title Senior Drillin~l Engineer Form 10-404 Rev 06/15/88 ~' Service WAG Injector Dat~ - ~/- ~'~ ~ SUBMIT IN DUPLICATE,.~, BP/AAI SHARED SERVICE DAILY OPERATIONS PAGE: 1 WELL: S-24 BOROUGH: NORTH SLOPE UNIT: PRUDHOE BAY FIELD: PRUDHOE BAY LEASE: API: 50- PERMIT: APPROVAL: ACCEPT: SPUD: RELEASE: OPERATION: DRLG RIG: DOYON 16 WO/C RIG: DOYON 16 lO/11/95 ( 1) TD: 0 PB: 0 RIG REPAIR MW: 0.0 MOVE RIG. EST REPAIRS TO RIG COULD TAKE 8 TO 18 HOURS. 10/12/95 (2) TD:10428 PB: 0 RIG AT NEW LOCATION MW: 0.0 MOVE RIG TO NEW LOCATION. EXPECT TO ACCEPT AT ABOUT 7:00 AM, 10/12/95. 10/13/95 (3) TD:10428 PB: 0 10/14/95 ( 4) TD:10428 PB: 0 10/15/95 (5) TD:10428 PB: 0 10/16/95 (6) TD:10428 PB: 0 10/17/95 ( 7) TD:10428 PB: 0 PULLED AND L/D TUBING HANGER MW: 0.0 ACCEPT RIG 10/12/95 AT 06:00 HRS. TEST EQUIPMENT, REMOVE XMAS TREE. RETRIEVED AND LAY DOWN TUBING HANGER, CBU. RU CONTROL LINE SPOOL. BHA #1, OVERSHOT & GRAPPLE MW: 0.0 PULL AND LAY DOWN 4-1/2" TUBING T/9492'. RETRIEVED 25 SSSV CLAMPS, 4 SS BANDS. EQUIPMENT WORK. PULL 9-5/8" PACKOFF, REPLACE, INSTALL NEW TBG SPOOL, RUN IN ALL LOCK DOWNS, TEST T/5000#. TEST WELL CONTROL EQUIPMENT. L/D TUBING T/0'. BHA %1, W/OVERSHOT AND GRAPPLE. RIH T/500', W/PKR MILL & CATCH MW: 0.0 BHA %1, RIH T/9486', TOP OF FISH. TAGGED FISH, P/U KELLY, FISH CAME FREE. CBU, POOH T/0'. L/D FISH. BHA #2, RIH T/500' WITH PACKER MILL AND CATCH ASSEMBLY. WORKED TOOLSTRING AT 20' MW: 0.0 BHA %2, RIH T/9552', TOP OF PACKER. MILLED PRODUCTION PACKER, PACKER FELL. CBU, POOH T/20'. PACKER STUCK AT TBG SPOOL, BACK OUT LOCK DOWN SCREWS ON WEAR BUSHING. JAR UP, ATTEMPT TO JAR, P/U BUMPER JARS AND DC JAR DOWN. RELEASE PACKER, UNSTUCK. R/U TUBING HANDLING EQUIPMENT MW: 0.0 PULLED AND LAID OUT BHA %2. BHA %3, RIH T/9688'. TAG TOP OF SAND AT 9688', DROP BALL, REVERSE CIRC. POOH T/0'. JET BASKET RETRIEVED, FULL OF PACKER JUNK. RIG UP TUBING HANDLING EQUIPMENT. RECEIVED MAR 2 G 1995 Alaska Oil & Gas Cons. Commission Anchorage WELL : S-24 OPERATION: RIG : DOYON 16 PAGE: 2 10/18/95 ( 8) TD:10428 PB: 0 10/19/95 (9) TD:10428 PB: 0 PACKER SET AT 9524' MW: 0.0 R/U TUBING HANDLING EQUIPMENT, PULL WEAR BUSHING. RAN TUBING T/9641', TIW 9-5/8" PACKER. INSTALLED TUBING HANGER. RAN TUBING T/9641' INSTALLED BOP TEST PLUG ASSEMBLY. R/D BOP STACK. INSTALLED XMAS TREE. CIRC AT 9641'. FREEZE PROTECT WELL WITH 148 BBL OF DIESEL, U-TUBED. SET PACKER AT 9524'. BOBBY FISHER W/AOGCC WAIVED PACKER TEST. RIG RELEASED 10/18/95 09:00 RIG RELEASED 10/18/95, 09:00. MW: 0.0 SIGNATURE: (drilling superintendent) DATE: R'EC iVED STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown __ Stimulate X Plugging.__ Pull tubing __ Alter casing Repair well Perforate X Other 2. Name of Operator BP Exploration (Alaska) Inc. 3. Address P. O. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 1633' SNL, 4228' WEL, SEC. 35, T12N, R12E, UPM At top of productive interval 4572' SNL, 1500' WEL, SEC. 26, T12N, R12E, UPM At effective depth 4550' SNL, 1440' WEL, SEC. 26, T12N, R12E, UPM At total depth 4483' SNL, 1289' WEL, SEC. 26, T12N, R12E, UPM 5. Type of Well: Development . Exploratory Stratigraphic ..... Service X ORIGINAL 6. Datum elevation (DF or KB) KBE = 66.25 AMSL feet 7. Unit or Property name Prudhoe Bay Unit 8. Well number S-24 (45-27-12-12 PBU 9. Permit number/approval number 90-55 /94-301 10. APl number 50- 029-22044 11. Field/Pool Prudhoe Oil Pool 12. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical Casing Length Structural -- Conductor 110 Surface 2639 Intermediate 9804 Production -- Liner 838 Perforation depth: measured 10428 feet BKB 9311 feet 10017 feet BKB 8961 feet Plugs (measured) Junk (measured) perf assy. fish @ 10183' WLM (05/92); fill on top offish @ 10112' WLM (01/91) Size Cemented Measured depth True vertical depth BKB 20 139 139 13 3/8 2580 c.f. 2668 2668 9 5/8 2040 c.f. 9843 8816 7 258 c.f. 9991'- 10040', 10050'- 10086', 10099'- 10132' 9590-10428 8610-9311 true vertical subsea 8873'-8992' (three intervals) Tubing (size, grade, and measured depth) 4 1/2" L-80 to 9560' with 4 1/2" tailpipe to 9646' Packers and SSSV (type and measured depth) 9 5/8" Baker packer at 9560'; 7" Otis WD packer at 9945' with 4 1/2" tailpipe to 9957'; 4 1/2" SSSV at 2102' · ~ ....... ::"-~ 13. Stimulation or cement squeeze summary See Attachment i'"";~'i'"~'~i:i'~'~i ~: .... ! :~: ~ ;?'''';;'~ ii'-¢~ 14. Intervals treated (measured) Treatment description including volumes used and final pressure ;':,i,::,:?,' ~ ';i~i] !:;; (ii;~;~-;, C',?:'~, "'"~ ...... :'"'~;"'?" Representative Daily Average Production or Injection Data OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation N/A N/A 12 N/A 4837 Subsequent to operation N/A N/A N/A N/A N/A 15. Attachments 16. Status of well classification as: Copies of Logs and Surveys run ... Daily Report of Well Operations ~ Oil~ Gas Suspended 17. I hereby certif~ that the foreg~g is true and cc~rrect to the best of my knowledge. S~gned '-',~? Title TechnicalAssistant III Form 10-404 Rev 06/15/88 Service Water & Gas Inject/on We/ Date ~'~/t//~,,~ SUBMIT IN DUPLIC,~~, WELL S-24(45-27-12-12) Stimulation Operation 7/05/95 A Bullhead HCL Acid Wash Treatment was performed using the following fluids: OPERATIONS SUMMARY S-24 WAS NOT TAKING WATER INJ. - PUMP 50 BBL HOT SEAWATER FOLLOWED BY 200 BBL 7.5% HCL&20% XYLENE FLUSHED W/1.5 TUB. VOL. HOT SEAWATER. HAD GOOD PRESSURE BREAK WHEN SOLVENT REACHED PERF. FLUIDS PUMPED BBLS. 277 SEAWATER 200 7.5%HCL 20% XYLENE Reperf 11/28/95 The following interval were reperforated using SPF, random orientation and 60° phasing. 9834'-9854' MD 9854'-9884' MD 3 3/8" guns, 6 LARRY GRANT Attn. ALASKA OIL + GAS CONSERVATION 3001 PORCUPINE DRIVE ANCHORAGE AK, 99501. Date: 5 December 1995 Transmittal of Data Sent by: HAND CARRY Dear Sir/Madam, Enclosed, please find the data as described below: WELL # DESCRIPTION 1 PFC/PERF FINAL BL+RF 1 CN FINAL BL+RF 1 PLS FINAL BL+RF 1 PDK FINAL BL+RF 1 CN FINAL BL+RF 1 PDK FINAL BL+RF ECC No. Run # 1 4313.06 Run # 1 5603.08 Run # 1 5753.05 Run # 1 5798.12 Run # 1 5931.08 Run # 1 6503.02 Please sign and return to: Attn. Rodney D. Paulson Atlas Wireline Services 5600 B Street Suite 201' Anchorage, AK 99518  Or FAX to (907) 563-7803 Received b y~.~~~~/'~~ Date: LARRY GRANT ~ Attn. ALASKA OIL + GAS CONSERVATION 3001 PORCUPINE DRIVE ANCHORAGE AK, 99501. Date: 12 October 1995~ RE: Transmittal of Data Sent by: US MAIL Dear Sir/Madam, Enclosed, please find the data as described below: WELL # DESCRIPTION x-0 1 CN/GR FINAL BL&RF 1 CCL TBG FINAL BL&RF 1 PLS FINAL BL & RF Run # 1 Run # 1 Run # 1 ECC No. 2577.07 4313.05 6234.03 Please sign.and return to: Attn. Rodney D. Paulson Atlas Wireline Services 5600 B Street Suite 201 Anchorage, AK 99518 ~ Or FAX to (907) 563-7803 Received b y~~~,/~/-_~...~/ Date: ':.. 'q Alaska Oil & (J~z5 ~o ......... Memorandum To: Terry Jordan Sepervisor Drilli.ng Engi~neering From:~'-/~C. Phillips ,'~,~/'~/'/~'~/~/ Manager PBO"~ps. Er~g~eering/Geoscience Date: 12/13/94 Subject: $-24 Rwo Request A RWO on injection well S-24 is needed to restore well integrity for long term MI and produced water injection. '" The well is currently injecting produced water under a variance from the State while options to fix a leaking permanent patch across GLM #1 were reviewed. Recent experience with these alternatives indicates that a RWO is needed for this future WAG injector. Please find attached the information requested to progress the workover. Please direct any comments or questions to Greg Hobbs at extn. 4191 or at home (696- 3036). LS/GSH cc w/a: G Hobbs cc w/o: S-24 Well File W. Peirce (ARCo) L. Seymour .. B. Turnbull ~n~ D.M. Richm¢ S. Jones NSOE NSRE PE Superintendent (Townsend/Walker) PBU NS Ramrods (Welch/Schmoyer) RECEIVED Aia~ka 0ii & Gas Cons. Anchora~,~ STATE OF ALASKA Ai"--~'(A OIL AND GAS CONSERVATION COMMIS REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown __ Stimulate Plugging__ Pull tubing Alter casing __ Repair well Perforate Other × 2. Name of Operator BP Exploration (Alaska) Inc. 3. Address P. O. Box 196612, Anchorage, Alaska 99519-6612 5. Type of Well: Development Exploratory Stratigraphic Service X 4. Location of well at surface 1633' SNL, 4228' WEL, SEC. 35, T12N, R12E, UPM At top of productive interval 4572' SNL, 1500' WEL, SEC. 26, T12N, R12E, UPM At effective depth 4550' SNL, 1440' WEL, SEC. 26, T12N, R12E, UPM At total depth 4483'SNL, 1289' WEL, SEC. 26, T12N, R12E, UPM ORIGINAL_ 6. Datum elevation (DF or KB) KBE = 66.25 AMSL feet 7. Unit or Property name Prudhoe Bay Unit 8. Well number S-24 (45-27-12-12 PBU 9. Permit number/approval number 90-55 / 94-301 10. APl number 50- 029-22044 11. Field/Pool Prudhoe Oil Pool 12. Present well condition summary Total depth: measured 10428 feet Plugs (measured) true vertical BKB 9311 feet Effective depth: measured 10017 feet Junk (measured) true vertical BKB 8961 feet Casing Length Size Cemented Measured depth Structural -- Conductor 110 20 139 Surface 2639 13 3/8 2580 c.f. 2668 Intermediate 9804 9 5/8 2040 c.f. 9843 Production -- Liner 838 7 258 c.f. 9590-10428 Perforation depth: measured 9991'-10040', 10050'-10086', 10099'-10132' perf assy. fish @ 10183' WLM (05/92); fill on top offish @ 10112' WLM (01/91) True vertical depth BKB 139 2668 8816 8610-9311 true vertical subsea 8873'-8992' (three intervals) Tubing (size, grade, and measured depth) 4 1/2" L-80 to 9560' with 4 1/2" tailpipe to 9646' Packers and SSSV (type and measured depth) 9 5/8" Baker packer at 9560'; 7" Otis WD packer at 9945' with 4 1/2" tailpipe to 9957'; 4 1/2" SSSV at 2102' 13. Stimulation or cement squeeze summary Intervals treated (measured) See Attachment RECEIVED 14. Treatment description including volumes used and final pressure DEC 2 2 1994 · I .I.. fhI O /"!.. II. Representative Daily Average Production or Injection Data ~i~n~ ~,,, ,., .oo ~,u,,~. Cu.,mis~i~ OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubi~ZjJl~e Prior to well operation N/A N/A N/A N/A N/A Subsequent to operation N/A N/A N/A N/A N/A 15. Attachments 16. Status of well classification as: Copies of Logs and Surveys run Daily Report of Well Operations Oil Gas Suspended Service Water Iniector 7. I hereby~that t~ ~egoing""7 ~''// ''' is true~ and correct to the best of my knowledge. SU TD ~D/~J/~'~~'~P~L I/C/A'AAT Signed (-'-/.-I~J,'//)~:::2~__~- Title Supervisor Waterflood and Miscible Flood BMI Form 10-~04 Re~/06/1~/8"~ j/' STATE OF ALASKA A!/-"KA OIL AND GAS CONSERVATION COMMi~-"---~N APPLICA/ION FOR SUNDRY APPROVALS 1. Type of Request: Abandon Suspend ~ Operation Shutdown ~ Re-enter suspended well __ Alter casing __ Repair well __ Plugging __ Time extension __ Stimulate ~ Change approved program Pull tubing __ Variance X Perforate Other__ 2. Name of Operator BP Exploration (Alaska) Inc. 3. Address P. O. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 1633' SNL, 4228' WEL, SEC. 35, T12N, R12E, UPM At top of productive interval 4572' SNL, 1500' WEL, SEC. 26, T12N, R12E, UPM At effective depth 4550' SNL, 1440' WEL, SEC. 26, T12N, R12E, UPM At total depth 4483' SNL, 1289' WEL, SEC. 26, T12N, R12E, UPM 5. Type of Well: Development ~ Exploratory ~ Stratigraphic Service X 6. Datum elevation (DF or KB) KBE = 66.25 AMSL 7. Unit or Property name Prudhoe Bay Unit 8. Well number S-24 (45-27-12-12 PBU 9. Permit number 90-55 10. APl number 50- 029-22044 11. Field/Pool Prudhoe Oil Pool feet 12. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical 10428 feet Plugs (measured) BKB 9311 feet 10017 feet Junk (measured) BKB 8961 feet perf assy. fish @ 10183' WLM (05/92); fill on top offish @ 10112' WLM (01/91) Casing Length Size Structural -- Conductor 110 20 S u rfac e 2639 13 3/8 Intermediate 9804 9 5/8 Production -- Liner 838 7 Perforation depth: Cemented 2580 c.f. 2040 c.f. 258 c.f. measured 9991~10040~ 10050~10086~ 10099~10132' Measured depth True verticalde~h BKB 139 139 2668 2668 9843 8816 9590-10428 true vertical subsea 8873'-8992' (three intervals) Tubing (size, grade, and measured depth) 4 1/2"L-80 to 9560' with 4 1/2" tailpipe to 9646' NOV - 3 1994 0il & Gas Cons. Commission Anch0ra.,~;~ Packers and SSSV (type and measured depth) 9 5/8" Baker packer at 9560'; 7" Otis WD packer at 9945' with 4 1/2" tailpipe to 9957'; 4 1/2" SSSV at 2102' 13. Attachments Description summary of proposal _'x__ Detailed operations program . . BOP sketch 14. Estimated date for commencing operation 15. Status of well classification as: 16. If proposal was verbally al~proved Oil Gas ~ Suspended Name of approver Date approved Service Water Injector 17. I hereby c~rtify that the fore~g~ing is true and correct to the best of my knowledge. Signed//~~ .~ ~,~,-'/ Title Supervisor Waterflood and Miscible Flood · '"' '.., ,.,// . . FORCOMMISSlON USE ONLY Conditions of approval: Notify Commission so representative may witness Plug integrity ~ BOP Test ~ Mechanical Integrity Test ~ Subsequent form required 10- Approved by order of the Commission Form 10-403 Rev 06/15/88 Original Signed By Commissioner Approved Copy Returned Date /f- //?//9 ~ SUBMIT I~ TRIPLICATE S-24 Variance Summary Well S-24 had a patch set across its bottom gas lift mandrel in September of 1993 to isolate a severely damaged orifice valve that couldn't be pulled. Until a recent failed MIT for injection service there was no indication of problems with the installation. A subsequent leak detection survey verified that the top sealing portion of the patch had failed. A variance is being requested for the well to remain on seawater injection only while a problem of this same nature is fixed on well S-05 (see attached request). After the success or failure of the S-05 job, a job of the same nature or a RWO for well S-24 will be pursued prior to placing the well on MI injection. lip EXI~,OP, J~'ION Mem=rlndum To: M. Townsend/E. Walker Date: 8/23/94 P.B. Production Engineering Supervisor L. Seymour~/l~~ W.F./M.I. FIo'b~FSDp~rvi,~r-' - '"'- From: Subject: S-05 Repeata "B" Patch Fix A patch from 9501' to 9526' WLMD across GLM #1 of this well is currently leaking. A thorough review of video of the patch and a leak detection Icg have determined that the patch did not set properly as the upper swedge did not Seat. Because the metal in the existing patch could be fiowcut, attempting to seat the swedge is not viewed as a solution to the problem. The best approach is viewed to be setting the retrievable top portion of a Repeata "B" patch across the top of the existing patch, The Repeata "B" would have an internal fishing neck like that on a 51/2" plug and would stab into and seat on top of current patch. It would have a 2.66" ID with external "V" packing at the bottom that would seal against the ID of the current patch. Paul Russell is the contact at HES and is up to speed on the job. This work is expected to cost approximately $25M. Other current alternatives are in the $200M + range. It is currently felt that large expenditures are not justifiable at this time. This request supercedes a prior request in February to attempt to pull the patch. Please direct any comments or questions to Greg Hobbs at extn. 4191 or at home (696- 3036). LS/GSH/gsh cc w/a: G Hobbs S-05 Well File cc w/o: B. Turnbull D.M. Richmond S. Jones NSOE NSRE RECEIVED NOV -'3 1994 Anchorc~ ::. STATE Of ALASKA ALAE~'"~'OIL AND GAS CONSERVATION COMMISSI¢ REPORT {.oF: SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown Stimulate Plugging Pull tubing Alter casing Repair well Perforate Other × 2. Name of Operator (Alaska) Inc. 3. Address P. O. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 1633' SNL, 4228' WEL, SEC. 35, T12N, R12E, UPM At top of productive interval 4572' SNL, 1500' WEL, SEC. 26, T12N, R12E, UPM At effective depth 4550' SNL, 1440' WEL, SEC. 26, T12N, R12E, UPM At total depth 4483'SNL, 1289' WEL, SEC. 26, T12N, R12E, UPM 5. Type of Well: Development Exploratory Stratigraphic Sewice X 6. Datum elevation (DF or KB) KBE = 66.25 AMSL feet 7. Unit or Property name Prudhoe Bay Unit 8. Well number S-24 (45-27-12-12 PBU 9. Permit number/approval number 90-55 / 10. APl number 50- 029-22044 11. Field/Pool Prudhoe Oil Pool 12. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical 10428 feet Plugs (measured) BKB 9311 feet 10017 feet Junk (measured) BKB 8961 feet peff assy. fish @ 10183' WLM (05/92); fill on top of fish @ 10112' WLM (01/91) Casing Length Size Cemented Structural -- Conductor 110 20 Surface 2639 13 3/8 2580 c.f. Intermediate 9804 9 5/8 2040 c.f. Production -- Liner 838 7 258 c.f. Perforation depth: measured 9991'-10040', 10050'-10086', 10099'-10132' Measured depth True verticalde~h BKB 139 139 2668 2668 9843 8816 9590-10428 8610-9311 true vertical subsea 8873c8992'(three ~tervals) Tubing (size, grade, and measured depth) 4 1/2" L-80 to 9560' with 4 1/2" tailpipe to 9646' Packers and SSSV (type and measured depth) RECEIVED N0V - 5 1994 Atsska 0il & 6as Cons. Commission Anch0ra~.;~ 9 5/8" Baker packer at 9560? 7" Otis WD packer at 9945' with 4 1/2" tailpipe to 9957'; 4 1/2" SSSV at 2102' 13. Stimulation or cement squeeze summary 7/13/94 Converted well to water injector. Intervals treated (measured) Treatment description including volumes used and final pressure 14. Prior to well operation Subsequent to operation Representative Daily Average Production or Injection Data OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure N/A N/A N/A N/A N/A N/A N/A N/A Tubing Pressure N/A N/A 15. Attachments Copies of Logs and Surveys run Daily Report of Well Operations 16. Status of well classification as: Oil Gas Suspended Service Water In_iectgr 17. I hereby ce that the is true and correct to the best of my knowledge. Form 1 lev 06/15/88 Title Waterflood and Miscible Flood Date SUBMIT IN ALASKA OIL & GAS CONSERVATION COMMISSION Attn. LARRY GRANT 3001 PORCUPINE DR. ANCHORAGE AK, 99501. USA Date: 2 August 1994 RE: '., Transmittal of Data Sent by: ANCHORAGE EXPRS Dear Sir/Madam, Enclosed, please find the data as described below: WELL # DESCRIPTION 1 PFC/PERF FINAL BL 1 PFC/PERF RF SEPIA 1 PLS STATIC FINAL BL 1 PLS STATIC RF SEPIA 1 PL LEAKDET. FINAL BL 1 PL LEAKDET. RF SEPIA 1 PLS STATIC FINAL BL 1 PLS STATIC RF SEPIA 1 PL GASENTRY FINAL BL 1 PL GASENTRY RF SEPIA ECC No. Run # 1 1291.02 Run # 1 Run # 1 Run # 1 3598.01 Run # 1 4313.04 Run # 1 Run # 1 2187.05 Run # 1 Run # 1 4005.01 Run # 1 Please sign and return to: Atlas Wireline Services 5600 B Street Suite 201 Anchorage, AK 99518 Attn. Rod, ne,~ D. Paulson Received by.' ~'~0~/~/0~ Please sign ~md return Petrotechnical Data Center BP Exploration (Alaska) Ino 900 East Benson Boulevard Anchorage, Alaska 99508 Dete STATE OF ALASKA ALAS"~-'"31L AND GAS CONSERVATION COMMISSIO"-'" REPORT OF SUNDRY WELL OPE/1ATIONS 1. Operations performed: Operation shutdown Pull tubing 2. Name of Operator BP Exploration (Alaska) Inc. Stimulate Plugging Perforate_ Alter casing Repair well ~ Other 3. Address P. 0. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 1633' SNL, 4228' WEL, SEC. 35, T12N, R12E, UPM At top of productive interval 4572' SNL, 1500' WEL, SEC. 26, T12N, R12E, UPM At effective depth 4550' SNL, 1440' WEL, SEC. 26, T12N, R12E, UPM At total depth 4483' SNL, 1289' WEL, SEC. 26, T12N, R12E, UPM I 5. Type of Well: I Development X Exploratory Stratigraphic Service ORIGINAL 6. Datum elevation (DF or KB) KBE = 66.25 AMSL feet 7. Unit or Property name Prudhoe Bay Unit 8. Well number S-24 (45-27-12-12 PBU 9. Permit number/approval number 90-55 / 90-207 10. APl number 50- 029-22044 11. Field/Pool Prudhoe Oil Pool 12. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical 10428 feet BKB 9311 feet 10017 feet BKB 8961 feet Plugs (measured) Junk (measured) illeff assy. fish @ 10183' WLM (05/92); on top offish @ 10112' WLM (01/91) Casing Length Structural -- Conductor 110 Surface 2639 Intermediate 9804 Production -- Liner 838 Perforation depth: measured Size Cemented Measured depth True vertical depth BKB 20 139 139 13 3/8 2580 c.f. 2668 2668 9 5/8 2040 c.f. 9843 8816 7 258 c.f. 9991 '- 10040', 10050'- 10086', 10099'- 10132' 9590-10428 8610-9311 RECEIVED dUN 27 199z~ ~;,t~ska. Uil & (;as Cons. Commission Anchorage 9 5/8" Baker packer at 9560'; 7" Otis WD packer at 9945' with 4 1/2" tai/pipe to 9957'; 4 1/2" SSSV at 2102' true vertical subsea 8873'-8992' (three intervals) Tubing (size, grade, and measured depth) 4 1/2" L-80 to 9560' with 4 1/2" tailpipe to 9646' Packers and SSSV (type and measured depth) 13. Stimulation or cement squeeze summary See Attachment Intervals treated (measured) Treatment description including volumes used and final pressure 14. Representative Daily Average Production or Injection Data OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation Subsequent to operation N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A 15. Attachments Copies of Logs and Surveys run Daily Report of Well Operations 16. Status of well classification as: Oil X Gas Suspended Service 17. I hereby c.ertify that the foreggifl'~l is Form 10-404'Rev 06/~§/88 tr~eland correct to the best of my knowledge. Title Senior Technical Assistant I SUBMIT IN DUPLICATE 09/10/93 fjh 6/23/94 WELL S-24(45-27-12-12) Tubing Patch Approval #93-207 Performed a Tubing Patch with 2.75" TS, 4 1/2" GS, with 4 1/2" baited sub and 14' x 4 1/2" dummy tubing patch to sliding sleeve at 9560' WL, POH. R/D Gas Cons. C~mm~ss~o~ Anchorage STATE OF ALASKA ALASI~"'")IL AND GAS CONSERVATION COMMISSIO' ~-~' REPORT SUNDRY WELL OPERATIONS 1. Operations Performed: Operation shutdown Stimulate__ Plugging Pull tubing__ Alter casing Repair well Perforate X Other 2. Name of Operator BP Exploration (Alaska) Inc. 3. Address ' P. 0. Box 196612, Anchorage, Alaska 99519-6612 5. Type of Well: Development Exploratory Stratigraphic Service 4. Location of well at surface 1633' SNL, 4228' WEL, SEC. 35, T12N, R12E, UPM At top of productive interval 4572' SNL, 1500' WEL, SEC. 26, T12N, R12E, UPM At effective depth 4550' SNL, 1440' WEL, SEC. 26, T12N, R12E, UPM At total depth 4483'SNL, 1289' WEL, SEC. 26, T12N, R12E, UPM 6. Datum elevation (DF or KB) KBE = 66.25 AMSL feet 7. Unit or Property name Prudhoe Bay Unit 8. Well number S-24 (45-27-12-12 PBU 9. Permit number/approval number 90-55 / 10. APl number 50- 029-22044 11. Field/Pool Prudhoe Oil Pool 12. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical 10428 feet BKB 9311 feet 10017 feet BKB 8961 feet Plugs (measured) Junk (measured) Pfilleff assy. fish @ 10183' WLM (05/92); on top offish @ 10112' WLM (01/91) Casing Length Structural -- Conductor 110 Surface 2639 Intermediate 9804 Production -- Liner 838 Perforation depth: measured Size Cemented Measured depth True vertical depth BKB 139 139 2580 c.f. 2668 2668 2040 c.f. 9843 8816 20 13 3/8 9 5/8 7 258 c.f. 9991 '- 10040', 10050'- 10086', 10099'- 10132' 9590-10428 8610-9311 RECEIVED /,,isska Oil & 6as Cons. 6ommissi( 9 5/8" Baker packer at 9560'; 7" Otis WD packer at 9945' with 4 1~¢~[~ to 995~; 4 1/2" SSSV at 2102' true vertical subsea 8873'-8992' (three intervals) Tubing (size, grade, and measured depth) 4 1/2" L-80 to 9560' with 4 1/2" tailpipe to 9646' Packers and SSSV (type and measured depth) 13. Stimulation or cement squeeze summary See Attachment Intervals treated (measured) Treatment description including volumes used and final pressure 14. Prior to well operation Subsequent to operation Representative Daily Average Production or Injection Data OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure 630 1062 1189 1637 770 " 783 1447 1614 Tubing Pressure 279 256 15. Attachments Copies of Logs and Surveys run Daily Report of Well Operations 16. Status of well classification as: Oil X Gas Suspended Service 17. I hereby certify that the forego~ag is true and correct to the best of my knowledge. Signed ~;~[~"'F~.~/~I 0~ Oj--u~,J~~ Title Senior TechnicalAssistantl Form 10-404 Rev 06/15/88 ,, Date 6/"~//q~ SUBMIT IN DU'PLIC'ATE 07/01/93 07~5~3 fjh 6/21/94 WELL S-24(45-27-12-12) ADDPERF The following additional interval were perforated using 3 3/8" guns, 4 SPF, random orientation and 120° phasing. 9860' - 9884' MD The following additional interval were perforated using 3 3/8" guns, 4 SPF, random orientation and 120° phasing. 9834' - 9864' MD RECEIVE. E; Anchorase 'E SIGN ONE COPY AND RETUR FO: ATLAS WIRELINE SERVICES Pouch 340013 Prudhoe Bay. AK 99734 This is to acknowledge receipt of the following prints and negatives. COMPANY: STATE OF ALASKA ATTENTION: LARRY GRANT FIELD: PRUDHOE BAY WELL - LOG DESCRIPTION PRINTS NEGS. SEPIA ~Z~ C-OB PFC~PERF)]CCI- 3,! 1 ~00-U. 100~0 1 J- 06 PLS 1 0 1 77-- 2.O ! ~lc:~- 1 0 1 J-08 PLS IQ-090-- 123~q0 J-08 GR/CCL OEWELRY> ~,, 1 ; O~-- l~n~. 1 ~%~0 J- 17 PLS ~'~ 1 0 1 P - 09 PL$ (LEAK DET) 5" 1 '~ - ,~~ 1 ~'~ 1 0 1 ~0_55 S-24 PLS ~%O-(~ 1 0 1 95-{[Q Z-07 A SBT/GR/~ ~. 11% ~O ~ ~ 0 1 z o { FORMTO0 L ~ RTN~ BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard RO, Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 DATE: 10/01/93 T# 85073 BPX/PBU ~LOGS Enclosed is your copy of the materials listed below. If you have any questions, please contact BP Well Records at (907) 564-4004. F-14 ~O-(~ PFC JC~UI~o 09/19/93 #1 10000.00-10250.00 ATLAS 5 " J-ilia).35 CNLJ(.~CCL 09/23/93 #1 10100.00-10934.00 ATLAS 5 " j-11~ GRICGU C%~U% 09/23/93 #1 9150.00- 9700.00 ATLAS 5 " J-21~- AU CNL I~JC~U 09/23/93 #1 9050.00- 9656.00 ATLAS 5 " M-06A{ PRODUCTION LOG W' 09/23/93 #1 11160.00-11950.00 ATLAS 5 " M-06A~ ~'~ #I~L$} . . 2 PRODUCTION LOG~-" 09/23/93 3300 00-10~45 00 ATLAS " M-23~7~-~ PRODUCTION LOG~" 09/19/93 #! 9300.00- 9926.00 ATLAS 5 " R-047~-%~ PFC/~ L~-F-~ 09/21/93 #1 9500.00- 9791.00 ATLAS 5 "' R-28~-~ PFC~ ~6~) 09/22/93 ~1 9100.00- 9336.00 ATLAS 5 " S-24 ~0-55 CA (T6~c~ 09/21/93 #1 9504.00- 9590.00 ATLAS 5 " Information Control Well Records STATE OF ALASKA Ab ._,(A OIL AND GAS CONSERVATION COMMISS, ..:,~1 ~'~x"~ APPLICATION FOR SUNDRY APPROVALS "2"./... Abandon Suspend Operation Shutdown Re-enter suspended well '.,,~'/~,,~ X/w Alter casing Repair well X Plugging Time extension Stimulate Pull tubing Variance Perforate Other 6. Datum elevation (DF 1. Type of Request: Change approved program__ 2. Name of Operator BP Exploration (Alaska) Inc. 3. Address P. O. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 1633' SNL, 4228' WEL, SEC. 35, T12N, R12E, UPM At top of productive interval 4572'SNL, 1500' WEL, SEC. 26, T12N, R12E, UPM At effective depth 4550' SNL, 1440' WEL, SEC. 26, T12N, R12E, UPM At total depth 4483'SNL, 1289' WEL, SEC. 26, T12N, R12E, UPM 12. Present well condition summary Total depth: measured true vertical Effective depth: Casing Structural Conductor Surface Intermediate Production Liner Perforation depth: measured true vertical Length .. 10428 feet BKB 9311 feet 10017 feet BKB 8961 feet Size 5. Type of Well: KBE = 66.25 AMSL feet 7. Unit or Property name Prudhoe Bay Unit 8. Well number S-24 (45-27-12-12 PBU 9. Permit number 90-55 10. APl number 50- 029-22044 11. Field/Pool Prudhoe 0il Pool Development X Exploratory __ Stratigraphic __ Service Plugs (measured) Junk (measured) perf assy. fish @ 10183' WLM (05/92); fill on top offish @ 10112' WLM (01/91) Cemented 110 20 2639 13 3/8 2580 c.f. 9804 9 5/8 2040 c.f. .. 838 7 258 c.f. measured 9991'-10040~ 10050'-10086~ 10099c10132' true vertical subsea 8873'-8992' (three intervals) Tubing (size, grade, and measured depth) 4 1/2" L-80 to 9560' with 4 1/2" tailpipe to 9646' Measured depth True verticaldepth BKB 139 139 2668 2668 9843 8816 9590-10428 8610-9311 RECEiVeD A U G -- 2 1995 Alaska 0il & Gas Cons. (.;or~;~'n Anchorage Packers and SSSV (type and measured depth) 9 5/8" Baker packer at 9560'; 7" Otis WD packer at 9945' with 4 1/2" tailpipe to 9957'; 4 1/2" SSSV at 2102' 13. Attachments Description summary of proposal ~ Detailed operations program __ BOP sketch 14. Estimated date for commencing operation 15. Status of well classification as: August 1993 16. If proposal was verbally approved Oil X Gas ~ Suspended Name of appAover D, Johnston 7/27/93 Date approved Service 17. I hereby c~'ti~ that the fore,~pin~is)true and correct to the best of my knowledge. ' / ' ' O FOR COMMISSION USE ONLY Conditions of approval: Noti~ Commission so representative may witness Plug integri~_ BOP Test ~ Location clearance ~ Mechanical Integri~ Test __ Subsequent form required 10-~o~ Original S~oned By Approved by order of the Commission David W. Johnston Date ! Approval No. Approved Co[ty Returned ;3, _ Commissioner Date Form 10-403 Rev 06/15/88 SUBMIT IN TRIPLICATE Well S-24 (45-27-12-12) Tubing Patch Installation Well S-24 has tubing to inner annulus communication through a leaking gas lift mandrel at 9S24 ft md bkb, A gas lift valve parted during removal and the lower part of the valve remains in the mandrel. It has not been possible to pull the remainder of the valve and a downhole camera run showed no prospect of fishing the valve. Permission is sought to install an internal tubing patch across the affected area. ,/-', U G - 2:1998 ~laska .OJJ ,& Gas l:;o~s. Oommission ~acl~orage BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard PO, Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 DATE: 07/07/93 T# 84739 BPX/PBUOLOGS Enclosed is your copy of the materials listed questions, please contact BP Well Records at ~_4oq~'~q p~.~ F-10~~:l-IIq PRODUCTION LOG F-1 PRODUCTION LOG N-2 ~'5'~ PERF S-2490~ PE~ S-2590-%~5 PE~ S-33~' ~0~ PE~ S-35 qZ-~q~ PE~ S-36 ~%-~ PE~ S-38~%- %%N PERF 06/28/93 #1 06/26/93 #1 06/26/93 #1 07/01/93 #1 07/01/93 #1 07/01/93 #1 07/03/93 ~1 06/30/93 ~1 06/30/..q~__-, #1 06/28/93 91 07/01/93 91 06/30/93 ~1 below. If you have any (907) 564-4004. 9200.00-10194.00 ATLAS 5 " 10980.00-12361.00 ATLAS 5 " 10980.00-12361.00 ATLAS 5 " 9915.00-10056.00 ATLAS 5 " 9700.00- 9950.00 ATLAS 5 " 9058.00- 9253.00 ATLAS 5 " 900Q,00- 9200.00 ATLAS 5 " 10100.00-10259.00 ATLAS 5 " 9500.00- 9702.00 ATLAS 5 " 9765.00- 9986.00 ATLAS 5 " 9200.00- 9350.00 ATLAS 5 " 13940.00-14224.00 ATLAS 5 " Information Control Well Records RECEIVED ,., JUL 1 2. 1993 AJaska 011 & Gas Cons. Commission Anchorage BP EXPLORATION BP Exploration (Alaskal Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 TO' DISTRIBUTION Date:l 1/13/90 T#:81798 FROM: SUBJECT: Information Control Well RecordS LR2-1 BP (~ASED HOLE FINALS Enclosed is your copy of the material listed below. If you have any questions, please contact BP Well Records at (907) 564-4445. B-12 Jewelry Log 10/26/90 #1 9000-9400 Camco 5" M-12 Tubing Tail 10/27/90 #1 9700-10168 Camco 5" M-12 INJ 10/27/90 #1 9700-10168 Carnco 5" M-28 INJ 10/21/90 #1 8650-8945 Camco 5" M-28 PITS 10/29/90 # 1 8600-8935 Camco 5" S-24 CCL 10/20/90 #1 9400-10100 Camco 5": ' Y-11 LEAK DET 10/13/90 #1 981.4-9875 Camco 5" Distribution' ARCO CHEVRON EXXON GEOSCIENCES MOBIL PHILLIPS RESERVOIR_._ ARCHIVES P, EC[1VED NOV 2 0 990 Alaska Oil & Gas Cons. Commission Ar~chorage BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 TO: ARCO DATE:10/05/90 EXXON T#: 81196 PHILLIPS STATE OF ALASKA ARCHIVES SYSTEM T~,pe & Transmittal Only MAGNETIC LIS TAPE & LISTING Enclosed is your copy of the material listed below. If you have any questions, please contact BP Well Records at (907) 564-4445. S-24 DIFL/BHC/AL/GR/CN 05/07/90 #- ATLAS#4313 1600BP! 9842-10432 TAPE POS.#07076 ENCLOSED IS THE CORRECTED TAPE TO INCLUDE THE UPPE~/ CN IN CASING FOR WELL S-24, LOGGED ON 5/7/90..~j~ ~f"~ OCT '1° Information Control Well Records LR 2-1 J. Dietz/S. McCurry BP EXPLORATION BP Exploration (Alaska)Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 TO: ARCO Date:05/17/90 CH EVRON T#:81155 EXXON MOBIL PHILLIPS ~---ST-~E OF ALA_A.SEA~ GEOSCIENCE ARCHIVES I~P OPEN HOLE FINAL Enclosed is your copy of the material listed below. If you have any questions, please contact BP Well Records at (907) 564-4445. S-24 BHCA 05/07/90 #1 9842-10394 Atlas 2"/5" S-24 CN/GR 05/07/90 #1 9842-10365 Atlas 2"/5" S-24 DIFL/GR 05/07/90 #1 9842-10423 Atlas 2"/5" S-24 GEOS/ARCO/EXXON/ARCHIVES ONLY. SS TVD 05/07/90 #1 R E C Alaska Oil & Anchorage 9842-10423 Atlas STATE ONLY: Magnetic Single Shot Directional Survey Date: Gyroscopic Directional Date: Inforation Control Well Records LR 2-1 J.. Dietz/S. McCurry Job~: BP EXPLORATION BP Exoloratlon (AlasKa) Inc.. 900 East Oenson I~oulevarcl P.O. Box 196612 Anchorage. Alaska 99519-6612 (g0'~ 561-5111 TO: DISTRIBUTION Date :09~ 14~90 T#:81649 FROM: SUBJECT: Information Control Well Records LR2-1 BP CASED HOLE FtNALS Enclosed is your copy of the matedai listed below. If you have any questions, please contact BP Well Records at (907) 564-4445; ' A-20 PROD-F A-20 Jewelry Log A-30 PITS E-10 Prod-F S-24 Prod-F W-17 PITS .__ 08/30/90 #1 11300-12350 Camco 5" 08/30/90 #1 11300-12300 Camco 5" 08/29/90 #1 11090-111 O0 Camco 5" 09/01/90 #1 11350-11700 Camco 5" 09/02/90 #1 9800-10175 Camco 5" 08/31/90 .... #1 11550-11810 . Camco 5" Distribution: ARCO CHEVRON EXXON GEOSCIENCES MOBIL PHILLIPS .~---STATE OF ARCHIVES ~ STATE OF ALASKA ,~'~'// ~'~':::, ALASKA L~IL AND GAS CONSERVATION COMMISSION ? WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1. Status of Well Classification of Service Well OIL [] GAS [] SUSPENDED [] ABANDONED [] SERVICE [] 21' Name of Operator '" 7. Permit Number BP Exp/ora. tion 90-55 3. Address B. APl Number P. O. Box 196612, Anchorage, Alaska 99519-6612 50- 029-22044 41' Location of well at surface 9. Unit or Lease Name 1633' SNL, 4228' WEL, SEC. 35, T12N, R 12E ! ~r.-~, ~ ~ LOC. ATIOt~ Prudhoe Bay Unit DATE, i VERIFIED[ 10. Well Number AtAt Top Producing IntervalTotal Depth i ~"D~'~'~-~ [ ~,t~rf'~-~'~ [~~ ~ S-24(34-26-12-12) 4572' SNL, 1500' WEL, SEC. 26, T12N, R 12E /-z/,-,,,-- ', H~'/~'I l! 11. Field and Pool Prudhoe Bay Field/Prudhoe Bay Pool 4483' SNL, 1289' WEL, SEC. 26, T12N, R 12E 5. Elevation in feet (indicate KB, DF, etc.) J6. Lease Designation and Serial No. KBE = 66.25' I ADL 28257 12. Date Spudded 13. Date T.D. ReaChed 14. Date Comp., Susp. or Aband. J15. Water Depth, if offshore J16. No. of Completions 04-24-90 05-07-90 ~I N/A feet MSL I ONE ~'. Total Depth ('MD+TVD) 18. Plug Back Depth (MD+TVD 19. Directional Survey 120. Depth'where SSSV set J21. Thickness o! Permafrost 10428'MD/9311'TVD 10386'MD/9275'TVD YES [] NO [] .I 2102'feet MD J 1946' 22. Type Electric or Oth'er Logs Run DIFL//BHC/Neutron GR 23. CASING, LINER AND CEMENTING RECORD .... sETTING DEPTH MD CASING SIZE WT. PER FT. GRADE TOP BO'FI'OM HOLE SIZE CEMENTING RECORD AMOUNT PULLED 20" Surface 11 O' ,, 13-3/8" 68# L-80 Surface 2668' 17-1/2" 2580 cufl Arcticset !1 & III , , 9-5/8" 47# L-80 Surface 9843' 12-1/4" 2040 cufl Class G 7" 26# L-80 9590' 10428' 8-1/2" 258 cu ft Class G ,,, 24. Perforations open to Production (MD+TVD of Top and Bottom and 25. TUBING RECORD interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MDI Sch/urnberger 5" @ 4 spf 4-1/2" 12.6# 9646' 9560' MD TVDss 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. 9991'-10040' 8873'-8914' DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED 10050'-10086' 8923'-8953' ' ' 13-3/8"x 9-5/8" DownSqueeze Annulus w/125 bb/s 10099;10132' 8964;8992' Dr), Crude Oil 27. PRODUCTION TEST '~ate First Production IMethod of Operation (Flowing, gas lift, e{c.) May 10, 1990 I Flowing7 Date of Test Hours Tested PRODUCTION FOR OIL-BBL GAS-MCF WATER-BBL C, HOKESIZE IGAS-OIL RATIO TEST PERIOD I Flow Tubing Casing Pressure CALCULATED S)IL-BBL GAS-MCF WATER-BBL OIL GRAVITY-APl (corr) Press. 24-HOUR RATE 28. CORE DATA Brief description of lithology, por'osity, fractures, apparent 'dips, and presence of oil, gas or water. Submit core chips. ,,, Form 10-407 Rev. 7-1-80 CONTINUED ON REVERSE SIDE Submit in duplicate 29. 30. GEOLOGIC MARKERS . AMATION TESTS NAME Include interval tested, pressure data, all fluids recovered and gravity, MEAS. DEPTH TRUE VERT. DEPTH GOR, and time of each phase. Sag " .9834, .. 8808, "" Shublik A 9883' 8849' Zone 4 9991' 8939' 31. LIST OF ATTACHMENTS ' ' ............ 32. I hereby certify that the foregoing is true and correct to the best of my knowledge ,,, INSTRUCTIONS General' This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Item 1' Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). Item 23: Attached supplemental records for this well should show the details of any multiple stage cement- ing and the location of the cementing tool. Item 27' Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In- jection, Gas Injection, Shut-in, Other-explain. Item 28: If no cores taken, indicate "none". Form 10-407 BP EXPLORATION DAILY DRILLING REPORT: PRUDHOE BAY UNIT As of 0600 Hrs. Tuesday, April 24, 1990 WELL: S-24 (34-26-12-12) RIG: NABORS#18-E Day: -1 Depth at 0600 Hrs. = 0 24 Hour Footage = 0 AP! No. 50-029- AFE Number: 125208 AFE Amount = Current Field Costs = Current Operation' Moving rig from S-21 to S-24. Summary of Last 24 Hours: Prepared for rig move. Mud Type Mud W.eight Viscosity #/gal Sec. p,y YP Fluid Loss Solids CC Temp oF Survey Deoth Anale Direction ,'[VD N-S E-W Section Coordinate Coordinate Dog, Leg o/100' Reviewed By: RECEIVED S E P 2 0 1990 Alaska Oil & Gas Cons. .'~chorag~l .,.,.-~ BP EXPLORATION DAILY DRILLING REPORT: PRUDHOE BAY UNIT As of 0600 Hrs. Wednesday, April 25, 1990 WELL: S-24 (34-26-12-12) RIG.' NABORS#18-E Day: 1 Depth at 0600 Hrs. = 820' 24 Hour Footage = 710' AP! No. AFE Number: AFE Amount = Current Field Costs = 50-029-22044 125208 - Current Operation' Drilling 17-1/2" h01e. Summary of Last 24 Hours: Accepted rig for S-24 at 1100 hrs on 4/24/90. Spud at 1700 hrs on 4/24/90. Drilled and surveyed to 820'. MudType Mud Weight Viscosity PV. YP.. Fluid Loss Solids Temp Spud Mud 8.7 #/gal 300 Sec. 29 62 15.8 cc 25% 53 °F Survey Depth Angle Direction TVD N,S E-W. Dog Leg ,.Section Coordinate Coordinate °/100' Reviewed By: 9./4 BP EXPLORATION DAILY DRILLING REPORT: PRUDHOE BAY UNIT As of 0600 Hrs. Thursday, April 26, 1990 WELL: S-24 (34-26-12-12) RIG: NABORS#18-E Day: 2 Depth at 0600 Hrs. = 2700 24 Hour Footage = 1880 APl No. 50-029-22044 AFE Number: 125208 AFE Amount = Current Field Costs = Current Operation' POH to run 13-3/8" casing. Summary of Last 24 Hours: Drilled and surveyed to 2700'. Mud Type Mud Weight Viscosity Spud Mud 9.9 #/gal 155 Sec. PV YP Fluid Loss Solids 28 37 13.6cc 11.5% Temp 54 OF Survey Depth Angle Directi~)n TVD N-$ E-W Section Coordinate, Ooordinate Dog Leg o/100' Reviewed By: BP EXPLORATION DAILY' DRILLING REPORT: As of 0600 Hrs. Friday, April 27, 1990 WELL: S-24 (34-26-12-12) PRUDHOE BAY UNIT RIG: NABORS#18-E Day: 3 Depth at 0600 Hrs. = 2700' 24 Hour Footage = 0 7 ' APl No. 50-029-22044 AFE Number: 125208 AFE Amount = Current Field Costs = Current Operation' RIH with 12-1/4" BHA. Summary of Last 24 Hours' Ran and cemented 13-3/8" casing. Mud Type Mud Weight Viscosity P V Low Solids 8.9 #/gal 33 Sec. 3 YP ,Fluid LOSS Solids 4 16.0 cc 4% Temp oF Survey Depth Angle Direction TVD N-S E-W Section (~Q~rdinate Coordinate Dog Leg °/100' Reviewed By: BP EXPLORATION DAILY DRILLING REPORT: PRUDHOE BAY UNIT As of 0600 Hrs. Monday, April 30, 1990 WELL: S-24 (34-26-12-12) RIG: NABORS#18-E : Day: 6 Depth at 0600 Hrs. = 6375' 72 Hour Footage = 3575' APl No. AFE Number: AFE Amount = Current Field Costs = 50-029-22044 125208 Current Operation' Drilling 12-1/4" hole. Summary of Last 72 Hours: Drilled and surveyed to 6375'. Mud Type , Mud Weight Viscosity Lightly Treated 9.5 #/gal 36 Sec. P V YP Fluid Loss Solids Temp. 5 7 8.0 cc 8.5% °F Survey Depth Angle Direction N-$ E-W Dog Leg TVD Section Coordinate Coordinate °/100' Reviewed By: ~././. RECEIVED "'L~P ~: 0 1990 kl~sk.a 0il & Gas Cons. Anchorage. BP EXPLORATION DAILY DRILLING REPORT: PRUDHOE BAY UNIT As of 0600 Hrs. Tuesday, May 1, 1990 WELL: S-24 (34-26-12-12) RIG: NABORS#18-E · Day: 7 Depth at 0600 Hrs. = 7690 24 Hour Footage = 1315 APl No. 50-029-22044 AFE Number: 125208 AFE Amount = Current Field Costs = Current Operation' Drilling 12-1/4" hole. Summary of Last 24 Hours: Drilled & surveyed to 7960'. Mud Type Mud Weight Viscosity Gel/Resinex 9.9 #/gal 42 Sec. ,p v YP, Fluid LOSS Solids 13 10 7.0 cc 11.5% Temp, 78 °F Survey Depth Angle Direction TVD N-S E-W Section Coordinate Coordinate °/100' Reviewed By: ~.~. BP EXPLORATION DAILY DRILLING REPORT: PRUDHOE As of 0600 Hrs. Wednesday, May 2, 1990 WELL: $-24 (34-26-12-12) ;' BAY UNIT RIG: NABORS#18-E Day' 8 Depth at 0600 Hrs. = 8410' 24 Hour Footage = 720' AP! No. 50-029-22044 AFE Number: 125208 AFE Amount = Current Field Costs = Current Operation: Drilling 12-1/4" hole. Summary of Last 24 Hours: Drilled & surveyed to 8410'. Mud Type Mud Weight Viscosity Gel/Resinex 9.9 #/gal 39 Sec. .P V YP Fluid Loss Solids Temp 1 0 6 6.8 cc 1 2% 77 °F Survey Deoth Angle Direction N-$ E-W Dog Leg TVD Section Coordinate Coordinate °/100' Reviewed By: 9./-/, BP EXPLORATION DAILY DRILLING REPORT: PRUDHOE BAY UNIT As of 0600 Hrs. Thursday, May' 3, 1990 WELL: S-24 (34-26-12-12) RIG: NABORS#18-E Day: 9 Depth at 0600 Hrs. = 8953' 24 Hour Footage = 543' APl No. 50-029-22044 AFE Number: 125208 AFE Amount = Current Field Costs = Current Operation' Drilling 12-1/4" hole. Summary of Last 24 Hours: Drilled & surveyed to 8953'. Mud Type Mud Weight Viscosity Gel/Resinex 9.9 Cf/gal 36 Sec. P, V ..Y,P Fluid LOSS Solids Temp 9 6 6.6 cc 1 2% °F Survey Depth Angle Direction N-S E-W D(~g Leg ,,TVD. Section Coordinate Coordinate °/100' Reviewed By: z~./-/. BP EXPLORATION DAILY DRILLING REPORT: As of 0600 Hrs. Monday, May 7, 1990 WELL: S-24 (34-26-12-12) PRUDHOE BAY UNIT RIG: NABORS#1 8-E Day: 13 Depth at 0600 Hrs. = 10428' 72 Hour Footage = 1033 APl No. 50-029-22044 AFE Number: 125208 AFE Amount = Current Field Costs = Current Operation' Circulate and condtion the hole at 10428'. Summary of Last 72 Hours' Ran 9-5/8" casing to 9847'. Tested casing to 3000 psi, ok. Drilled 8-1/2" hole to 10,428' TD. MudType Mud Weight Viscosity P V Y.P Fluid Loss Solids Gel/Resinex 8.9 #/gal 31 Sec. 5 4 11.6 cc 4% Temp oF Survey Depth Angle Direction TVD, N-S E-W Section Coordinate Coordinate DQg Leg °/100' Reviewed By: '-0, ~-~. BP EXPLORATION DAILY DRILLING REPORT: PRUDHOE BAY UNIT As of 0600 Hrs. Tuesday, May 8, 1990 WELL: S-24 (34-26-12-12) RIG: NABORS#18-E Day: 1 4 Depth at 0600 Hrs. = 10428 24 Hour Footage = 0 AP! No. 50-029-22044 AFE Number: 125208 AFE Amount = Current Field Costs = CUrrent Operation' RIH with liner. Summary of Last 24 Hours: Logged. Made conditioning trip. POOH. Mud Type Mud Weiaht - . _ 8.9 #/gal Viscosity P V ,YP 35 Sec. 6 8 Fluid Loss Solids 10.0 cc 4% Temp 80 OF Survey ~ Angle N-S E-W --, Section Coordinate Coordinat~ Dog,Leg °/!00~ Reviewed By: RECE VEO sEP ?- 0 ~990 BP EXPLORATION DAILY DRILLING REPORT: PRUDHOE As of 0600 Hrs. Wednesday, May 9, 1990 WELL: S-24 (34-26-12-12) BAY UNIT RIG: NABORS#18-E Day: 15 Depth at 0600 Hrs. = 24 Hour Footage = 0 10428' APl No. 50-029-22044 AFE Number: 125208 AFE Amount = Current Field Costs = Current Operation' RIH with 6" bit and 7" scraper. Summary of Last 24 Hours: Ran 7" liner to 10,428'. Cemented in place. POH. Mud Tv.De Mud Weight Viscosity P V YP Low Solids 8.9 #/gal 35 Sec. 6 8 Fluid Loss Solids Temp, 10.0 cc 4% °F Survey D_.EEt_b A n__QC_e. Direction N-S E-W Dog Leg ,TVD Section Coordinate Coordinate °/100' Reviewed By: ~, c-C. BP EXPLORATION DAILY DRILLING REPORT: PRUDHOE As of 0600 Hrs. Thursday, May 10, 1990 WELL: S-24 (34-26-12-12) BAY UNIT RIG: NABORS#18-E Day: 16 Depth at 0600 Hrs. = 10386' PBTD 24 Hour Footage = 0' AP! No. 50-029-22044 AFE Number: 125208 AFE Amount = Current Field Costs = Current Operation: Cased hole logging. Summary of Last 24 Hours: Ddlled out cement to 10,386'. Tested liner to 3000 psi, ok. POH. -. MudType Mud Weight Viscosity P,V YP Fluid Loss Solids Temp Seawater 8.6 #~gal Sec. cc °F Survey Deoth Angle Direction TVD N-S E-W Doa Lea -- -- Section Coordinate Coordinate °/100' Reviewed By: '3. H. BP EXPLORATION DAILY DRILLING REPORT: As of 0600 Hrs. Friday, May 11, 1990 WELL: S-24 (34-26-12-12) PRUDHOE BAY UNIT RIG: NABORS#18-E Day: 17 Depth at 0600 Hrs. = 10386' PBTD 24 Hour Footage = 0' APl No. 50-029-22044 AFE Number: 125208 AFE Amount = Current Field Costs = Current Operation' POH and lay down drill pipe. Summary of Last 24 Hours: Ran cased hole logs. Mud Tv.De Mud Weight Viscosity Seawater 8.2 #/gal Sec. PV YP Fluid Loss Solids CC Temp oF Survey Deoth Angle Direction .'i'VD N-s E-w Section Coordinate Coordinate Dog Leg °/100' Reviewed By: -~./-/, RECEIVED SEP ?-0 1990 Alaska Oil & Gas Cons. Go.m~sS~O~ Anchorage- BP EXPLORATION DAILY DRILLING REPORT: PRUDHOE BAY UNIT As of 0600 Hrs. Monday, May 14, 1990 WELL: S-24 (34-26-12-12) RIG: NABORS#18-E Day: 18 Depth at 0600 Hrs. = 10386' PBTD 24 Hour Footage = 0 AP! No. 50-029-22044 AFE Number: 125208 AFE Amount = Current Field Costs = Current Operation' Freeze protect annulus with diesel. Summary of Last 24 Hours: Ran 4-1/2" tubing. Installed x-mas tree. Released rig 0600 hrs on 5/12/90. , -. MudType Mvd Weight Viscosity PV YP Fluid LOSS Solids Seawater 8.6 #/gal Sec. cc TemD oF Survey Depth Angle Direction ,TVD N-S E-W SectiQn ¢oQrdinate Coordinate 0og Leg o/100' Reviewed By: F', %. SUB. SURFACE DIRECTIONAL $URVEY ~-'J UIDANCE r~ONTINUOUS ~IOOL Company BP EXPLORATION ,, Well Name S-24 (34-26-12-12)(1633' SNL)4228' WEL~SEC 35rT12N,R12E) F)e)d~Looat~Orl PRUDHOE BAY) NORTH SLOPE, ALASKA Job Reference No. 73862 Logaed By: PORTER lO-MAY-90 ,- \%%% ~ ' uo~¥' · K R U W E L L SCHLUMBERGER GCT DIRECTIONAL SURVEY CUSTOMER LISTING FaR BP EXPLORATION S-Z4 (34-26-12-1Z) PRUDHOE BAY NORTH SLOPEr ALASKA SURVEY DATE: lO-MAY-1990 ENGINEER: K. PORTER METHODS OF COMPUTATION TOOL LOCATION: TANGENTIAL- AVERAGED DEVIATION AND AZIMUTH INTERPOLATION: LINEAR VERTICAL SECTION: HORIZo DIST. PROJECTED ONTO A TARGET AZIMUTH OF NORTH 50 DEG 11 MIN EAST COMPUTATION DATE: 17-MAY-90 PAGE BP EXPLORATION S-24. (34.-26-12-12) PRUDHOE BAY NORTH SLOPE, ALASKA DATE DF SURVEY: lO-MAY-1990 0.00 0.00 -66.25 0 0 N 0 0 E 100.00 100.00 33.75 0 6 N 14 54 W 200.00 200.00 133.75 0 10 S 25 21 W 300.00 300.00 233.75 0 17 S 68 30 E 400.00 400.00 333.75 0 8 S 24 37 W 500.00 500.00 4*33.75 0 1! S 82 33 E 600.00 600.00 533.75 0 10 S 25 16 W 700.00 700.00 633.75 0 5 N 13 6 E 800.00 800.00 733.75 0 10 S 55 36 E 900.00 900.00 833.75 0 1 N 69 45 W 1000.00 1000.00 933.75 1100.00 1100.00 1033.75 1200.00 1199.99 1133.74. 1300.00 1299.99 1233.74 1400.00 1399.99 1333.74 1500.00 14.99.98 1433.73 1600.00 1599.97 1533.72 1700.00 1699.96 1633.71 1800.00 1799.95 1733.70 1900.00 1899.96 1833.69 0 8 N 32 5 E 0 15 N 87 32 E 016 N 60 11E 0 32 N 83 31 E 0 35 N 70 33 E 04,9 N 71 5 E 0 37 N 68 9 E 0 53 N 85 52 E 0 68 S 83 16 E 0 56 S 65 13 E 2000.00 1999.93 1933.68 2100.00 2099.93 2033.68 2200.00 2199.93 2133.68 2300.00 2299.91 2233.66 2400.00 2399.90 2333.65 2500.00 2499.89 2433.64 2600000 2599.87 2533.62 2700.00 2699.85 2633.60 2800.00 2799.81 2733.56 2900.00 2899.69 2833.44 0 37 S 70 8 E 0 9 S 18 3 W 0 56 N 15 58 W 0 58 N 27 40 W 0 53 N 22 31 W I I N 5 35 W I 6 N 3 53 W I 32 N 3 46 E I 53 N 6 19 E 328 N 2 3 E 3000.00 2999.36 2933.09 5 52 ' 3100.00 3098.56 3032.31 8 10 3~.~00 O0 3197.11 3130.86 11 0 3~0~00 3294..86 3228.61 13 19 3~00.00 .~91 36 3325.11 16 4*8 35~0.00 -~86:66 3620.21 19 22 ,.~7~:~0 ~(,'~6~..71.96 3605.71 24 46 .~ ~%9.67 3783.~2 28 44 N 2 55 E N 8 58 E N 16 47 E N 23 28 E N 28 11 E N 31 64 E N 35 56 E N ~+0 33 E N 4.4 12 E N 66 6 E INTERPOLATED VALUES FOR EVEN 100 FEET OF MEASURED DEPTH ENGINEER: K. PORTER TRUE SUB-SEA COURSE MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH DEPTH DEPTH DEPTH DEG MIN DEG MIN VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUTH FEET DEG/100 FEET FEET FEET DEG MIN 0.00 0.00 0.00 N 0.00 E 0.18 0.04 0.08 N 0.17 E 0.07 0.00 0.06 N 0.06 E -0.05 0.56 0.31 S 0.19 E 0.14 0.49 0.27 S 0.41 E 0.04 0.4*6 0.59 S 0.54 E O.OZ 0.01 0.62 S 0.54 E 0.03 0.27 0.76 S 0.66 E -0.02 0.36 0.82 S 0.65 E 0.14. 0.11 0.76 S 0.81 E 0.00 N 0 0 E 0.19 N 62 57 E 0.07 N 52 64 E 0.36 S 31 23 E 0.50 S 56 28 E 0.80 S 62 45 E 0.83 S 60 58 E 0.99 S 41 30 E 1.05 S 38 34 E 1.11 S 67 5 E 0.26 0.19 0.77 S 0.98 E 0.40 0.26 0.72 S 1.12 E 0.88 0.21 0.48 S 1.55 E 1.46 0.16 0.46 S 2.29 E 2.32 0.00 0.18 S 3.18 E 3.47 0.11 0.19 N 4.36 E 4.72 0.28 0.79 N 5.48 E 5.79 0.16 0.97 N 6.73 E 6.99 0.51 1.03 N 8.24 E 7.77 0.07 0.61 N 9.60 E 1.25 S 52 0 E 1.33 S 57 6 E 1.62 S 72 54 E 2.33 S 78 36 E 3.18 S 86 43 E 4.36 N 87 32 E 5.54. N 81 50 E 6.80 N 81 46 E 8.30 N 82 52 E 9.62 N 86 21 E 8.35 0.78 0.03 N 10.85 E 8.56 0.70 0.19 S 11.30 E 8.88 0.4.9 0.30 N 11.31 E 9.4,1 1.13 1.84 N 10.71 E 9.73 0.00 3.19 N 10.00 E 10.66 0.00 6.72 N 9.68 E 11.64 0.32 6.51 N 9.46 E 12.96 0.33 8.83 N 9.49 E 15.02 0.28 11.64. N 9.85 E 18.26 1.38 16.23 N 10.24. E 10.85 N 89 69 E 11.30 S 89 3 E 11.31 N 88 28 E 10.87 N 80 16 E 10.50 N 72 17 E 10.77 N 66 0 E 11.49 N 55 29 E 12.96 N 47 4 E 15.25 N 40 15 E 19.20 H 32 15 E 23.80 2.84 24.50 N 32.72 2.41 36.82 N ¢6.32 2.89 53.25 N 64.59 3.09 73.00 N 88.49 2.63 96.44 N 117.41 3.49 123.25 N 151.31 3.35 152.50 N 189.71 5.04 183.39 N 233.83 2.13 280.87 1.44 10.56 E 26.68 N 23 19 E 11.91 E 38.70 N 17 55 E 15.92 E 55.58 N 16 38 E 23.24 E 76.61 N 17 40 E 34.82 E 102.53 N 19 51 E 50.13 E 133.05 N 22 8 E 69.87 E 167.75 N 26 37 E 94.11 E 206.13 N 27 10 E 216.12 N 124.27 E 249.30 N 29 54 E 2¢8.99 N 158.11 E 294.95 N 32 25 E KELLY BUSHING ELEVATION: 66.25 FT COMPUTATION DATE: 1T-MAY-90 PAGE BP EXPLORATION S-24 C34-26-12-12) PRUDHOE BAY NORTH SLOPE9 ALASKA DATE OF SURVEY: lO-MAY-1990 KELLY BUSHING ELEVATION: 66.25 FT ENGINEER: K. PORTER INTERPOLATED VALUES FOR EVEN 100 FEET OF MEASURED DEPTH TRUE SUB-SEA COURSE MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH DEPTH DEPTH DEPTH DEG MIN DEG MIN VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUTH FEET DEG/IO0 FEET FEET FEET DEG 4000.00 3936.65 3870.40 30 31 4100.00 4021.93 3955.68 32 4200°00 4106.02 4039.77 33 12 4300.00 4189.69 4123.44 33 ZO 4400.00 4272.93 4206.68 33 59 4500.00 4355.49 4289.24 34 42 4600.00 4437.17 4370.92 35 40 4700.00 4517.97 4451.72 36 33 4800.00 4597.88 6531o63 36 58 4900.00 4677.91 4611.66 36 44 N 45 9 E 330.03 2.45 N 45 37 E 382.06 1.12 N 45 30 E 436.00 0.413 N 45 17 E 490.58 0.72 N 44 55 E 545.78 0.51 N 44 46 E 601.95 0.93 N 44 39 ~ 659.37 0.99 N 44 31 E 718.02 1.33 N 44 41 E 777.84 0.87 N 45 23 E 837.55 0.74 283.60 N 193.26 E 343.19 N 34 16 E . 320.22 N 230.48 E 394.54 N 35 45 E 358.11 N 269.11 E 447.95 N 36 55 E 396.55 N 308.12 E 502.18 N 37 51 E 435.68 N 347.37 E 557.21 N 38 34 E 475.70 N 387.13 E 613.32 N 39 8 E 516.68 N 427.73 E 670.76 N 39 37 E 558.65 N 469.10 E 729.48 N 40 1 E 601.49 N 511.27 E 789.42 N 40 22 E 643.87 N 553.68 E 849.19 N 40 42 E 5000.00 4758.39 4692.14 35 56 5100.00 4839.26 4773.01 36 13 5200.00 4920.08 4853.83 35 49 5300.00 5001.32 4935.07 35 23 5400.00 5083.36 5017.11 34 30 5500°00 5166.10 5099.85 33 56 5600.00 5249.20 5182.95 33 39 5700.00 5332.87 5266.62 32 48 5800.00 5417.24 5350.99 32 15 5900.00 5501.94 5435.69 32 N 45 58 E 896.74 N 45 46 E 955.39 N 46 2 E 1014.10 N 46 14 E 1072.26 N 46 51 E 1129.33 N 46 27 E 1185.39 N 46 0 E 1240.88 N 45 39 E 1295.49 N 45 57 5 1349.00 N 46 2 E 1402.02 0.76 0.10 0.34. 0.92 0.83 0.72 1.15 0.97 0.35 0.25 685.26 N 596.22 E 908.33 N 4! 2 5 726.25 N 638.41 E 966.96 N 41 19 E 767.28 N 680.66 5 1025.67 N 4~ 35 E 807.71 N 722.67 E 1083.81 N 41 49 E 846.99 N 764.22 E 1140.80 N 42 4 E 885.49 N 805.10 E 1196.78 N 42 17 E 923.99 N 845.26 E 1252.28 N 42 27 E 962.17 N 884.53 E 1306.97 N 42 36 E 999.64 N 922.95 E 1360.56 N 42 43 E 1036.56 N 961.20 E 1413.63 N 42 50 E 6000.00 5586.74 5520.49 31 57 6100.00 5671.61 5605.36 31 55 6200.00 5756.57 5690.32 31 43 6300.00 5841.66 5775.41 31 39 6400.00 5926.80 5860.55 31 38 6500.00 6011.99 5945.74 31 28 6600.00 6097.31 6031.06 31 17 6700°00 6182.86 6116.61 30 52 6800.00 6269.04 6202.79 30 18 6900.00 6355.41 6289.16 30 19 N 45 58 E 1454.88 N 45 49 E 1507.62 N 45 50 E 1560.22 N 45 42 E 1612.59 N 45 17 E 1666.87 N 44 51 E 1717.03 N 44 26 E 1768.95 N 43 57 E 1820.43 N 43 48 E 1870.85 N 44 7 E 1920.95 0.33 0.17 0.30 0.06 0.29 0.26 0.24 I .38 0.22 0.49 1073.39 N 999.32 E 1466.56 N 42 57 E 1110.18 N 1037.31 E 1519.38 N 43 3 E 1146.92 N 1075.16 E 1572.07 N 43 9 E 1183.55 N 1112.82 E 1624.54 N 43 14 E 1220.30 N 1150.24 E 1676.96 N 43 18 E 1257.31 N 1187.29 E 1729.30 N 43 22 E 1294.42 N 1223.95 E 1781.45 N 43 24 E 1331.49 N 1260.07 E 1833.21 N 43 25 E ) 1368.11 N 1295.19 E 1883.94 N 43 26 E ' 1404.39 N 1330.17 E 1934.33 N 43 27 E 7000.00 6441.82 6375.57 30 6 "7100o00 6528.51 6462.26 29 46 7200.00 6615.17 6548.92 30 7300.00 6701.60 6635.35 30 11 7400.00 6788.08 6721.83 30 18 7500.00 6874.37 6808.12 30 20 7600.00 6960.55 6894.30 30 38 7700.00 7046.34 6980.09 31 10 7800.00 7131.80 7065.55 31 24 7900.00 7216.99 7150.74 31 48 N 44 18 E 1971.02 N 44 49 E 2020.62 N 45 27 E 2070.32 N 46 23 E 2120.48 N 46 44 E 2170.59 N 46 58 5 2221.04 N 48 0 E 2271.71 N 48 54 E 2323.06 N 50 12 E 2374.98 N 51 38 E 2427.36 0.25 0 0.45 0.82 0.53 0.43 0.71 0.68 0.90 0.68 1440.47 N 1365.28 E 1984.67 N 43 28 E 1475.99 N 1400.25 E 2034.51 N 43 29 E 1511.22 N 1435.58 E 2084.39 N 43 32 E 1546.18 N 1471.74 E 2134.64 N 43 35 E 1580.65 N 1508.24 5 2184.77 N 43 39 E 1615.27 N 1545.06 E 2235.24 N 43 44 E 1649o57 N 1582.44 E 2285.87 N 43 49 E 1683.65 N 1620.88 E 2337.08 N 43 55 E 1717.37 N 1660.36 5 2388.76 N 44 2 E 1750.38 N 1701.04 E 2440.77 N 44 11 E COMPUTATION DATE: 17-MAY-90 PAGE BP EXPLORATION DATE OF SURVEY: lO-MAY-IS90 S-24 (36-26-12-12) KELLY BUSHING ELEVATION: 66.25 FT PRUDHOE BAY NORTH SLOPE, ALASKA ENGINEER: K. PORTER INTERPOLATED VALUES FOR EVEN 100 FEET OF MEASURED DEPTH TRUE SUB-SEA COURSE VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUTH DEPTH DEPTH DEPTH DEG MIN 8000.00 7301.83 7235.58 32 2 8100.00 7386.41 7320.16 32 27 8ZO0.O0 7470.61 7404.36 32 56 8300.00 7554.22 7487.97 33 21 8400.00 7637.81 7571.56 33 26 8500.00 7721.01 7654.76 33 55 8600.00 7803.92 7737.67 34 Z 8700.00 7886.74 7820.¢9 34 8 8800.00 7969.65 7903.40 33 49 8900.00 8052.70 7986.45 34 0 9000.00 8135.14 8068.89 34 52 9100.00 8216.89 8150.64 35 24 9200.00 8298.22 8231.97 35 52 9300.00 8378.86 8312.61 36 40 9400.00 8458.69 8392.44 37 38 9500.00 8537.77 8471.52 37 25 9600.00 8617.65 8551.40 36 30 9700.00 8698.56 8632.31 35 28 9800.00 8780.52 8714.27 34 28 9900.00 8863.25 8797.00 33 56 10000.00 8946.83 8880.58 32 35 10100.00 9031.46 8965.21 31 58 10200.00 9116.41 9050.16 31 41 10300.00 9201.66 9135.41 31 22 10400.00 9287.11 9220.86 31 18 10428.00 9311.03 9244.78 31 18 DEG MIN FEET DEG/IO0 FEET FEET FEET OEG MIN N 53 3 E 2480.25 N 54 44 E 2533.48 N 55 39 E 2587.22 N 56 29 E 2641.79 N 57 4 E 2696.31 N 57 48 E 2751.36 N 58 57' E 2806.71 N 59 34 E 2862.03 N 59 23 E 2917.22 N 59 11 E 2972.20 N 59 27 E 3028.10 N 60 34 E 3084.85 N 61 22 E 3141.99 N 61 38 E 3199.98 N 61 54 E 3258.98 N 62 2 E 3318.89 N 62 46 E 3377.73 N 64 33 E 3434.89 N 66 28 E 3490.14 N 67 27 E 3543.87 N 67 21 E 3596.31 N 67 12 E 3647.22 N 67 Z E 3697.71 N 67 I E 3.747 76 ,66 ,6a E 1.06 0.70 0.92 0.88 0.83 0 0.45 0.28 0.41 1.08 0.67 0.88 0.44 0.32 1.21 1.31 2.83 1.56 1.59 0.46 0.94 0.20 0.77 0.22 0.00 0.00 1782.73 N 1742.93 E 2493.17 N 44 21 E 1814.12 N 1786.06 E 2545.79 N 44 33 E 1844.92 N 1830.35 E 2598.83 N 44 46 E 1875.56 N 1875.85 E 2652.65 N 45 0 E 1905.56 N 1921.82 E 2706.39 N 45 15 E 1935.56 N 1968.48 E 2760.67 N 45 29 E 1964.91 N Z016.07 E 2815.21 N 45 44 E \ 1993.44 N 2064.31 E 2869.70 N 46 0 E ) 2021.85 N 2112.47 E 2924.11 N 46 15 E - / 2050.29 N 2160.35 E 2978.39 N 46 30 E 2079.22 N 2209.00 E 3033.62 N 46 44 E 2108.06 N 2258.84 E 3089.71 N 46 59 E 2136.20 N 2309.78 E 3146.17 N 47 14 E 2164.43 N 2361.73 E 3203.52 N 47 30 E 2192.91 N 2414.80 E 3261.92 N 47 45 E 2221.61 N 2468.87 E 3321.27 N 48 I E 2249.68 N 2522.08 E 3379.63 N 48 16 E 2275.81 N 2574.71 E 3436.34 N 48 32 E 2299.60 N 2626.81 E 3491.17 N 4a 48 E 2321.37 N 2678.61 E 3544.53 N 49 5 E 2342.47 N 2729.28 E 3596.68 N 49 22 E 2363.06 N 2778.40 E 3647.40 N 49 37 E 2383.59 N 2827.01 E 3697.77 N 49 52 E 2404.02 N 2875.13 E 3747.76 N 50 6 E 2424.33 N 2922.93 E 3797.49 N 50 ZO E 2430.03 N 2936.31 E 3811.43 N 50 23 E COMPUTATION DATE: 17-MAY-90 PAGE BP EXPLORATION S-24 (34-26-12-12) PRUDHOE 8AY NORTH SLOPEr ALASKA DATE OF SURVEY: lO-MAY-1990 KELLY BUSHING ELEVATION: 66.25 FT ENGINEER: K. PORTER INTERPOLATED VALUES FOR EVEN 1000 FEET OF MEASURED DEPTH TRUE SUB-SEA COURSE HEASURED VERTICAL VERTICAL DEVIATION AZIMUTH DEPTH DEPTH DEPTH DEG MIN DEG MIN VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUTH FEET OEG/IO0 FEET FEET FEET OEG MIN 0.00 0.00 -66.25 0 0 1000.00 1000.00 933.75 0 8 2000.00 1999.93 1933.68 0 37 3000.00 2999.34 2933.09 5 52 4000.00 3936.65 3870.~0 30 31 5000.00 4758.39 4692.14 35 56 6000.00 5586.74 5510o~9 3! 57 7000.00 6441.82 6375.57 30 6 8000.00 7301.83 7235.58 32 2 9000.00 8135.14 8068.89 34 52 N 0 0 E 0.00 N 32 5 E 0.26 S 70 8 E 8.35 N 2 55 E 23.80 N 45 9 E 330.03 N 45 58 E 896.74 N 45 58 E 1454.88 N 44 18 E 1971.02 N 53 3 E 2480.25 N 59 27 E 3028.10 0,00 0 0.78 2.84 2.45 0.76 0.33 0.25 1.06 0.67 0.00 N 0.00 E 0.00 N 0 0 E , 0.77 S 0.98 E 1.25 S 52 0 E 0.03 N 10.85 E 10.85 N 89 49 E 24.50 N 10.56 E 26.68 N 23 19 E 283.60 N 193.26 E 343.19 N 34 16 E 685.26 N 596.22 E 908.33 N 41 2 E 1073.39 N 999.32 E 1466.56 N 42 57 E '~ 1440.47 N 1365.28 E 1984.67 N 43 28 E 1782.73 N 1742.93 E 2493.17 N 44. 21 E 2079.22 N 2209.00 E 3033.62 N 46 4.4 E 10000.00 8946.83 8880.58 32 35 10428.00 9311.03 9244.78 31 18 N 67 21 E 3596.31 N 66 56 E 3811.40 0.94 0.00 2342.47 N 2729,28 E 3596.68 N 49 22 E 2430.03 N 2936.31 E 3811.43 N 50 23 E COMPUTATION DATE: 17-MAY-g0 PAGE BP EXPLORATION S-24 C34-26-12-12) PRUDHOE BAY NORTH SLOPE, ALASKA OATE OF SURVEf: lO-MAY-1990 KELLY BUSHING ELEVATION: 66.25 FT INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH TRUE SUB-SEA COURSE HEASUREO VERTICAL VERTICAL DEVIATION AZIMUTH DEPTH DEPTH DEPTH DEG MIN DEG MIN 0.00 0.00 -66.25 0 0 N 0 0 E 66.25 66.25 0o00 0 11 N Z9 36 g 166.25 166.25 100.00 0 7 S 4,6 58 W 266.25 266.25 200o00 0 16 S 29 15 E 366.25 366.25 300.00 0 6 N 4,2 39 E 4,66.25 4,66.25 4,00.00 0 16 S 36 54, E 566.25 566.25 500.00 0 6 S 62 52 g 666.25 666.25 600.00 0 9 S 85 [5 E 766.25 766.25 700.00 0 7 S 2 [3 W 866.25 866.25 800.00 0 7 N 22 24, E 966.25 966.25 900.00 [066.25 [066.25 1000.00 1166.25 1166.25 1100.00 1266.26 1266.25 1200.00 1366.26 1366.25 1300.00 14,66.27 1466.25 1400.00 1566.28 1566.25 1500.00 1666.28 1666.25 1600.00 1766.29 1766.25 1700.00 1866.30 1866.25 1800.00 0 11 N 88 9 E 0 6 S 73 29 E 0 18 N 4,9 5 E 0 32 S 86 21 E 0 33 N 69 0 E 0 4,8 N 73 4,2 E 0 4,1 N 56 55 E 0 4,9 N 85 25 E 0 51 N 89 43 E 0 48 S 69 55 E 1966.32 1966.25 1900.00 2066.32 2066.25 2000°00 2166.32 2166.25 2100.00 2266.33 2266.25 2200.00 2366.34, 2366.25 2300.00 24,66.36 2&66.25 2566.37 2566.25 2500.00 2666.39 2666.25 2600.00 2766.4,3 2766.25 2700.00 2866.50 2866.25 2800.00 2966.75 2966.25 2900.00 3067.38 3066.25 3000.00 0 ¢4 S 64 38 E 0 11 S 66 37 E 0 32 N 2 4,8 E 0 58 N 22 4, W 052 N 25 12 ~ 0 55 N 7 29 W I I N 7 4~ ~ 1 26 N 1 46 E I 37 N 8 33 E 3 9 N 4 51E N 2 17 E N 7 25 E N 15 10 E N 21 40 E N 27 23 E N 30 38 E N 35 17 E N 40 12 E N 44 22 E N 4,5 46 E 3168.603166.25 358~.19 .25 369~. ~'J~ .25 3 b-. 33 .25 3~9~ U. ENGINEER: K. PORTER 5 14 7 34, 3100.00 10 21 3200.00 12 36 3300.00 16 6 34,00.00 18 43 3500.00 21 28 3600.00 24 30 3700.00 27 34 3800.00 28 57 VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUTH FEET OEG/IO0 FEET FEET FEET DEG MIN 0.00 0.00 0.00 N 0.00 E 0.17 0.11 0.01 N 0.21 E 0.15 0.25 0.12 N 0.10 E -0.08 0.37 0.20 S 0.07 E 0.15 0.49 0.27 S 0.4,2 E 0.00 0.59 0.52 S 0.4,3 E 0.09 0.49 0.56 S 0.59 E -0.03 0.60 0.77 S 0.61 E -0.01 0.25 0.76 S 0.62 E 0.12 0.17 0.79 S 0.81 E 0.00 N 0 0 E 0.21 N 86 44 E ' O. 16 N 41 20 E 0.21 S 18 34 E 0.50 S 57 12 E 0.67 S 39 al E 0.82 S 46 27 E , 0.98 S 38 19 E ) 0.97 S 39 14 E ~ 1.13 S 45 40 E 0.18 0.53 0.8[ S 0.90 E 0.32 0.82 0.71 S 1.00 E 0.72 0.00 0.57 S 1.42 E 1.21 0.28 0.4,7 S 1.97 E Z.O0 0.25 0.30 S 2.86 E 3.02 0.36 0.04 N 3.90 E 4.34 0.07 0.61 N 5.15 E 5.39 0.42 0.94 N 6.23 E 6.63 0.21 1.05 N 7.75 E 7.54 0.12 0.81 N 9.14, E 1.21 S 4,8 7 E 1.23 S 54 43 E 1.53 S 68 0 E 2.02 S 76 40 E 2.88 S 83 58 E 3.90 N 89 24 E 5.18 N 83 16 E 6.30 N 81 27 E 7.82 N 82 16 E 9.17 N 84, 57 E 8.17 0.33 0.19 N 10.4,8 E 8.58 1.09 0.14 S 11.28 E 8.66 2.07 0.13 S 11.39 E 9.25 0.00 1.32 N 10.94, E 9.58 0.10 2.72 N 10.21 E 10.14, 0.87 4.15 N 9.75 E 11.09 O.OZ 5.90 N 9.53 E 12.35 0.4,4 7.96 N 9.45 E 1¢.26 0.10 10.62 N 9.71 E 16.92 1.45 14,.30 N 10.11 E 10.48 N 88 57 E 11.28 S 89 17 E 11.39 S 89 22 E 11.02 N 83 7 E 10.56 N 75 6 E 10.59 N 66 57 E 11.20 N 58 13 E 12.35 N 49 55 E 14,.39 N 42 26 E ] 17.51 N 35 16 E 21.64 1.55 21.30 N 29.41 1.51 32.42 N 41.52 2.10 4,7.67 N 58.77 2.63 66.93 N 81.63 3.02 89.88 N 110.81 3.4,6 117.28 N 146.02 3.11 14,8.06 N 187.09 5.18 181.38 N 236.28 2.38 289.96 1.36 10.42 E 23.71 N 26 4 E 11.26 E 34.32 N 19 9 E 14.32 E 49.77 N 16 43 E 20.72 E 70.07 N 17 12 E 31.35 E 95.19 N 19 14 E 46.51 E 126.16 N 21 38 E 66.69 E 162.3B N 24 15 E 92.38 E 203.55 N 26 59 E 217.89 N 125.99 E 251.69 N 30 2 E 255.33 N 164.67 E 303.82 N 32 49 E COMPUTATION DATE: 17-HAY-90 PAGE BP EXPLORATION S-24 C34-26-12-12) PRUOHOE BAY NORTH SLOPE, ALASKA DATE OF SURVEY: lO-MAY-1990 KELLY BUSHING ELEVATION: 66.25 FT ENGINEER: K. PORTER INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA OEPTH TRUE SUB-SEA COURSE MEASURED VERTICAL VERTICAL DEVIATION AZIHUTH DEPTH DEPTH OEPTH DEG MIN DEG MIN VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUTH FEET DEG/IO0 FEET FEET FEET DEG 403¢.49 3966.25 3900.00 31 18 4152.55 4066.25 4000.00 32 50 4271.97 4166.25 4100.00 33 11 4391.95 4266.25 4200.00 33 56 4513.09 4366.25 4300.00 34 51 4635.87 4466.25 4400000 36 0 4760.36 4566.25 4500.00 37 6 4885.44 4666.25 4600.00 36 50 5009.70 4766.25 4700.00 35 54 5133.45 4866.25 4800.00 36 13 N 45 25 E 347.66 1.99 N 45 32 E 410.21 1.16 N 45 23 E 475.26 0.43 N 44 5? E 541.31 0.57 N 44 46 E 609.37 1.45 N 44 37 E 680.28 0.87 N 44 32 E 754.06 0.49 N 45 16 E 828.88 0.92 N 45 55 E 902.41 0.52 N 45 44 E 975.09 0.00 296.05 N 205.83 E 360.57 N 34 49 E 339.98 N 250.64 E 422.38 N 36 24 E 385.75 N 297.19 E 486.95 N 37 37 E 432.50 N 344.20 E 552.75 N 38 31 E 480.99 N 392.39 E 620.74 N 39 12 E 531.63 N 442.49 E 691.68 N 39 46 E 584.47 N 494.49 E 765.59 N 40 14 E 637.75 N 547.48 E 840.51 N 40 39 E 689.22 N 600.31 E 914.00 N 41 3 E / 740.04 N 652.57 E 986.66 N 41 24 E 5256.89 4966.25 4900.00 35 41 5379°22 5066.25 5000.00 34 38 5500.18 5166.25 5100.00 33 56 5620.45 5266.25 5200.00 33 28 5739.64 5366.25 5300°00 32 29 5857.91 5466.25 5400.00 32 3 5975.85 5566.25 5500.00 31 59 6093.69 5666.25 5600.00 31 55 6211o38 5766.25 5700.00 31 43 6328°88 5866.25 5800.00 31 37 N 46 5 E 1047.25 N 46 49 E 1117.57 N 46 26 E 1185.49 N 45 56 E 1252.15 N 45 39 E 1316.80 N 46 I E 1379.77 N 45 58 E 1442.12 N 45 50 E 1504.30 N 45 49 E 1566.18 N 45 37 E 1627.69 0.37 0.23 0.72 1.13 0.37 1.02 0.14 0.19 0.35 0.28 790.33 N 704.59 E 1058.81 N 41 43 E 838.92 N 755.63 E 1129.05 N 42 I E 885.56 N 805.17 E 1196.88 N 42 17 E 931.85 N 853.38 E 1263.56 N 42 29 E 977.11 N 899.81 E 1328.31 N 42 39 E 1021.07 N 945.15 E 1391.36 N 42 47 E 1064.50 N 990.13 E 1453.79 N 42 56 E 1107.86 N 1034.92 E 1516.05 N 43 3 E 1151.09 N 1079.45 E 1578.05 N 43 10 E 1194.13 N 1123.65 E 1639.68 N 43 15 E 6446.34 5966.25 5900.00 31 36 6563.63 6066.25 6000.00 31 28 6680°62 6166.25 6100.00 31 4 6796.77 6266.25 6200.00 30 18 6912.55 6366.25 6300.00 30 19 7028.22 6466.25 6400.00 29 57 7143o51 6566.25 6500°00 29 55 7259.08 6666.25 6600.00 30 17 7374.73 6766.25 6700.00 30 12 7490.59 6866.25 6800.00 30 20 N 45 2 E 1689.08 N 44 35 E 1750.11 N 44 7 E 1810.51 N 43 47 E 1869.23 N 44 8 E 1927.25 N 44 25 E 1985.06 N 45 I E 2042.17 N 46 6 E 2099.91 N 46 47 E 2157.88 N 46 54 E 2216.30 0.33 0.98 I .00 0.20 0.42 0.83 0.63 0.79 0 0.36 1237.44 N 1167.4T E 1701.24 N 43 20 E 1280.92 N 1210.68 E 1762.53 N 43 23 E 1324.32 N 1253.13 E 1823.23 N 43 25 E 1366.94 N 1294.06 E 1882.31 N 43 26 E 1408.94 N 1334.58 E 1940.67 N 43 27 E 1450.56 N 1375.15 E 1998.79 N 43 28 E 1491.32 N 1415.52 E 2056.15 N 43 30 E 1531.93 N 1456.84 E Z114.05 N 43 34 E ~ 1571.93 N 1498.9T E 2172o06 N 43 38 E 1612.02 N 1541.59 E 2230.50 N 43 43 E 7606.63 6966.25 6900.00 30 39 " 7723.27 7066.25 7000.00 31 13 7840.38 7166.25 7100.00 31 32 7958°03 7266.25 7200.00 32 1 8076.12 7366.25 7300.00 32 21 8194.81 7466.25 7400.00 32 54 8314.40 7566.25 7500.00 33 15 8434.12 7666.25 7600.00 33 37 8554.55 7766.25 7700.00 34 1 8675.25 7866.25 7800.00 34 5 N 48 5 E 2275.09 N 49 10 E 2335.11 N 50 50 E 2396.06 N 52 25 E 2458.02 N 54 25 E 2520.72 N 55 36 E 2584.41 N 56 38 E 2649.65 N 57 3 E 2715.02 N 58 20 E 2781.56 N 59 36 E 2848.34 0.74 0.52 0.95 0.74 0.87 0.78 1.04 0.58 0.73 0.35 1651.83 N 1584.95 E 2289.24 N 43 49 E 1691.55 N 1629.98 E 2349.08 N 43 56 E 1730.78 N 1676.63 E 2409.71 N 44 5 E 1T69.25 N 1725.22 E 2471.16 N 44 17 E 1806.70 N 1775.63 E 2533.19 N 44 30 E 1843.32 N 1828.02 E 2596.06 N 44 46 E 1879.92 N 1882.45 E 2660.40 N 45 2 E 1915.81 N 1937.63 E 2724.84 N 45 19 E 1951.68 N 1994.35 E 2790.43 N 45 37 E 1986.42 N 2052.34 E 2856.21 N 45 56 E COMPUTATION DATE: 1T-MAY-gO PAGE BP EXPLORATION S-24 C34-Z6-12-12) PRUDHOE BAY NORTH SLOPE9 ALASKA DATE OF SURVEY: lO-MAY-1990 KELLY BUSHING ELEVATION: 66,25 FT ENGINEER: K. PORTER INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH TRUE SUB-SEA COURSE MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH DEPTH DEPTH DEPTH OEG MIN DEG MIN VERTICAL OOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUTH FEET DEG/IO0 ~- FEET FEET FEET DEG MIN 8795.9! 7966.25 7900°00 33 50 8916.35 8066,Z5 8000.00 34 10 9037.97 8166.25 8100o00 35 7 9160.6! 8266.25 8ZO0,O0 35 36 9284°29 8366.25 8300.00 36 34 9409.56 8466.25 8400.00 37 43 9535.79 8566.25 8500.00 37 10 9660.Z5 8666.Z5 8600°00 35 50 978Z,67 8766.Z5 8700.00 34 38 9903.62 8866.25 8800.00 33 55 N 59 24 E 2914.97 N 59 11 E 2981.Z5 N 59 45 E 3049.58 N 61 13 E 3119.42 N 61 35 E 3190.80 N 61 56 E 3264.70 N 62 7 E 3340.10 N 63 47 E 3412.42 N 66 5 E 3480.71 N 67 27 E 3545.80 0 1.13 0.81 0.93 0 0.97 0.51 0 1 0.59 ZOZO.69 N Zl10.51 E 2921.89 N 46 15 E Z054.98 N 2168.21 E 2987.3Z N 46 32 E Z090.24 N 2227.77 E 3054.85 N 46 49 E 2125.15 N Z289.60 E 3123.86 N 47 8 E 2159.97 N 2353.49 E 3194.44 N 47 27 E Z195.66 N Z419.96 E 3267.59 N 47 47 E 2231.76 N Z488.02 E 3342.31 N 48 6 E ,~ 2265.72 N 2553.86 E 3414.04 N 48 25 E 2295.65 N 2617.82 E 3481.81 N 48 45 E 2322.14 N 2680.47 E 3546.44 N 49 6 E 10023.01 8966.25 8900.00 32 21 10140.99 9066.25 9000.00 31 52 10258.51 9166.25 9100.00 31 30 10375.59 9266.25 9200.00 31 18 10428.00 9311.03 9244.78 31 18 N 67 18 E 3608.tl N 67 6 E 3667.96 N 66 58 E 3727.05 N 66 56 E 3785.33 N 66 56 E 3811.40 1 °03 0.36 0.71 0.00 0.00 Z347.23 N Z740.67 E 3608.43 N 49 25 E 2371.48 N Z798.38 E 3668.08 N 49 43 E 2395.57 N 2855.23 E 3727.07 N 50 0 E 2419.36 N 2911.26 E 3785.34 N 50 16 E ?.430.03 N 2936.31 E 3811.43 N 50 23 E SCHLUMBEROER O I RECT I ONAL SURVEY COMPANY BP EXPLORAT I ON WELL S-24 ( B4-28- i 2- 12 ) FIELD PRUOHOE BAY COUNTRY USA RUN ONE DATE LOOOED 10 - MAY - 90 REFERENCE WELL · S-24 (1633' SNL, ( 34_ 36_ 12 :~-'~-~,) 4228' WEL, .,EC 35, T12N, R12E) .'-'-.HORIZONTAL PROJECTION I~RT, ~)00 REF ?~2 SCI:¥.E = l/S00 IN/FT 15130 1013O 60UTH -1000 -r:~:lO #E6T 0 500 1000 l ~ ~300 2500 EA6T WELL' S-24 (1633' SNL, 4228' WEL, _,EC 35, T12N, R12E) ~' VERTICAL PROJECTION -~00 -1000 0 0 1000 ~ ;BOO0 4000  ~ '' .... 1, , ~ ..... , ., , , ....... · .,~ ~ , . . , , ,. , _ ~ ~ · .... ~..~.. _.~. ~..~. .~..~ _~_ .~..~ ~.~ ,~ ~ ~ ~- -~.. ~.~, ...~..._....~ ..... ........,.... ..... -, ,~,' '-~ ~, i , ~ i. , :~-,,~ ..... ~ ~ : ,e-~-~- , .~.T--?~',-?' : , ~ . -~-?---M-.: . . '~+"~. . ~ .t ;:'~'44: , , ~ ,;:- ~r~.,., ...~1: , ,~-"-"f"-,-'~-, · ++-fff-- -.+-~.-: .??.,i...f -l'??v~ 'tt'~v "?~'Tff- -~!'t: i : }-?~T' ;~"tt' 1'?T?" "71"ti .... 71~-~' "+-ffTl- -~.,-~-~-~-.-+..i-..~+- ~.~-.i--+---~++-i ..... ~--~++-. ~R-~-.~ ~-+.-- --+-e.tff ...... i.-.~....~-~ ..... ~.+'+-.* ....... ~'++-~ ..... t"i"w~ -~H..~.- ,~+.~-.++4.+. -+.-.!--.+-.-e+-!.+-!.+-.-ff-+~ "+"f'm'+'-"~-44-r?~- ~'+ff .... t'+'t'+"l'i--'r+"f ...... f"f-'f+-'"t"t"f'i'" "+'t"tf-~ T ~; ' * ~ * * * * ~ ' ' ' ' ~ * ~ ...... *'"*-*t- '-* ....... *'"~ .......... *'~-+"'~'r'~-'~ ............. *""?"~"+'~""'l-+''~''* ....... t ........ ~" - ~'- ,, , ~ , ,~ ~ ¢ ~ ~ ~ ~ ~ ~ ~ ~ ~ ,~.':..;..4..~..i ...... ~' ~._' ...L.~..~ ....... ~ ....... ~...' ...... ~4---~ , ,.¢ .- · ,, :~ii::::::::::::::::::::::::: ::::::::::::::::::::::::::::::::::~::~:~:~::::~:~::~*~i~::::~:*:~:~::?:~:~ .~., ...:44-.~-~.-;--.;-.~4.-.4.-.14..~ .... ;.+..i...¥.Li...~...~.~ ....... H-.+-~':~.... 4-.i.~4..-..+.F~+~.~...~-H-.-4--~F~- ~.i~-.F~..'.-H..i.~ ~:::! J -i:- *.~-~-~-+*--*--.-~---,~+- ++'-?'~ ...... ~.-+-+-,--.-+,+,-.~..-*...i~.-...-~:~.~???~ 4.~.+.-?.?.-.e-?--~.~?.,--~.4.?~- ~ ~-"~"ff'f-~-~-~ .... ~'~"~ ....... +'"~'"i"+'''''+''~''', '?'l'-r~'?'?-q'TT~"-','~, ~ i ~ ~ T--t"r~'-r,'!"'?"T"-~"'l~ 1 ZiiJ iii, iiii i~ iiii~ii~i i~iiiiiii ii ' i,'' i~[i ii~'~.~ ~ i '. ~.~...?,.~ .... ~...f.~..~.....¥.~.~ ...... ~-'+-t--t ...... t.'+-+.ff ....... ~'-++'t-' t't"fff ...... ft--~'*'--'--t ?'-~---~'~'-t--t"?~'?"~"t't't"r":'TT"m~--?T'?~-:' --+--~ -++.H-f-++-~.+--..~-++;~4.+~-~-'4'"~4";Z ~ i 4.4, i ~-! 4-i...i...,..L..LL4-.~ ·'-', 'T"]"'r'-+'""?+'-+'+"?""*"?'*"~ ....... '-*'+"+ .... .-+++..-.~ ~ i~. -e+4-..i ...... -~ ~-~'~'-?H'-t- ~t':: :t"H'"?i"TvT"t ....... i'7"t'-t"T"rt"?"":~t :4.~.-' ~. ~. ~fi i~ ~'H-t'~'''t''ffr't'':''',''TT ~ l'il~ ~¢¢~:..~..+~.% .4..-~-;..-I .... ;-.,-.;...;...,..-1..-;...;..4 ....... ;..4...;..4...,_.~.4...;...~_..,_~.~+~¢- e..~+...e~....dm~. 11-+.H ...... H-++i-~+t.~.fi~, .i :~ i i +- ~-'"~" '' ..................... .... ....... ~-i ..... i~-+.-i ...... i.-~-+'+.' ...+.+-'!-!-t-'~-+-~-~ .... .'-~'?'"~" ~-'.i.44+-~"4"'~"~'-'t~-i~ .... i.-+.+-¥...-~--i--+.~-..++-+.-¥+--i..+-.i-;.---.i.-4.-~--~-!~- d~t-'-ti-t"?'::::~::~::/~::?'"'M'4"+~ .....~i"4-~-' '.~ -- -H't't-~"TTTT',, "+"~'-*'"*",, ,, "*"~'*";~,,, ....... ~"*";";~,, ..... ...... ~";'"~'"~'"~'-~'"~";'"~,~,, ..... :~,~'"~"+~"'"t"Ht~ 'tf'tT-'Tr'''''?''' ...... ~,,~ rffff'+-fl~, J I!t -i-+-~..4-~?~--~-i.4...--~4-.+¥ ....... ~-~.+-+.-....!..~--i..+.-~...~-~+-..~-.~- .+e~+-.-~.t~ ...... i...;..i.~ ;.~.+..i...i ~ J ?.~.~.. . ?'~d"'t'" ?rifT:. ,-,~...~.,.~,i- -~'I '" '~' "~' '" ' .... ' ................... ":: -t-ti'? ~.+.~...¥.~.. :~:~...,...k..,._~ :: IJ ! ! ~ , · .T~ . . ~ ~ ! : i , ~ ! I ~ I , I . : ' , . ' !l ..;-;...;...;...;..;-.l...i...L.. 11.Ii iJil !lli !iii ii_~i .... i:~:i..]., ii~i ii!I 1111 ilii l~i~ ~ i i i i I : , ~ ~ , ' ~ ' ' ~ ~. ~......~...~ ...... ~.-~.-~4.-. ~ ..... ' ..... ~ - ..... ....... ..... ...... ~-~'?r'~'1'-"ii~i"'f- 'ti"i~t"~"t't ....... *-*~ ~-* -:::~ ...... ~: :~?' '+-,'?*-"-+'~'*'~ ...... ~"+",'", ...... ,T?'"t ...... ' i 4 ~-i k i i i i i J _L . ~] ] i _l l ~ ~.4.4.i--i--.i-,i...L-,-.4 ..... ~ .~ ~ ~ i i ~~ ~ ~'"'+~'"~'"~'-~++-+~--~ ~ ~-~--~ ........... ~ ................ t'"*'" ' ~, ~.~$,~t.....,...~-.,.4...~ ...... ~ ................... ~-..4-~..~ --~-4.4-4-.~-i"~-~- " ' ' ' ' ' ..... ' -~"~'Tt~ J--'+'?-?~?~,,~, ~',,~,,,,,,,~,~??'"~'~"~"~"~i~-'~"'~-;-~ ....... ~+'~'~-~ -t'?T?:,~,~~"~"++'+'t~"'"~'"~"~~',~, ~.??"?"?"'"?"?~'"T ....... PROJECTION ON VERTICIqL PLt:I~ 50, - 2~1:1. ~CAL£D IN VERTICMI. IIP'TI~ HORIZ $CPlLE = 1/1000 IN/FT TELECD Teleco Oilfield Se ;s of Alaska Inc. 6116 Nielson Way Anchorage, AK 99502 (907) 562-2646 May 8, 1990 JOB #757 BP EXPLORATION (ALASKA) INC. WELL: S-24 PRUDHOE BAY RIG: NABORS 18E ~oJ~3'- Attached please find a copy of the computer calculated MWD directional surveys for the above mentioned well. Teleco appreciates this opportunity to provide service to BP Exploration (Alaska) Inc. Teleco is committed to providing the highest quality MWD Service and we would welcome any comments or questions concerning these surveys or any of our other services. Sincerely, Jonathan G. Mapes Field Operations Supervisor JGM/el Enclosures A ,~r~4J~'l' COMPANY TELECO OILFIELD SERVICES SURVEY CALCULATIONS Company: BP EXPLORATION Well: S 24 Location: PBU Rig: NABORS 18E TELECO Job # Grid Correction: Magnetic Declination: Total grid correction: Proposed DirectiOn: 757 0.0° 30.0° 30.0° 50.4° MINIMUM CURVATURE CALCULATION Meas Course True Vertical Coordinates ClosUre Dog Leg Depth Length Incl Azi Vert. Dp. Section N/S E/W Distance Angle Severity feet feet deg deg feet feet feet feet feet deg deg/100° ******************************************************************************************************* TIE-IN TO SURFACE 0 0 0.0 182.0 0.0 0.0 0.0 0.0 0.0 N 45.00E 0.00 SPERRY-SUN SINGLE-SHOT GYRO 474 474 0.3 182.0 474.01 -0.70 1.06S 0.03W 1.07 S 1.49W 0.05 982 508 0.0 182.0 982.01 -1.46 2.22S 0.07W 2.22 S 1.76W 0.05 1497 515 1.0 46.0 1496.98 3.03 0.89N 3.20E 3.32 N 74.42E 0.20 1965 468 0.8 109.0 1964.93 8.74 2.76N 9.06E 9.47 N 73.07E 0.20 PAGE 1 Company: BP EXPLORATION, Well: S 24, Location: PBU, Riq: NABORS 18E Meas Course True Vertical Coordinates Closure Dog Leg Depth Length Incl Azi Vert. Dp. Section N/S E/W Distance Angle Severity feet feet deg deg feet feet feet feet feet deg deg/100' 2469 504 1.2 355.0 2468.89 13.46 6.94N 11.72E 13.62 N 59.36E 0.33 TELECO MWD SURVEYS 2731 262 1.7 12.4 2730.81 18.07 13.47N 12.32E 18.25 N 42.44E 0.25 2794 63 1.8 1.2 2793.78 19.46 15.37N 12.54E 19.84 N 39.20E 0.57 2889 95 3.8 13.1 2888.66 22.94 19.93N 13.28E 23.95 N 33.68E 2.18 2985 96 6.0 0.8 2984.31 28.72 28.06N 14.07E 31.39 N 26.64E 2.54 3078 93 8.1 10.3 3076.60 36.89 39.37N 15.31E 42.24 N 21.25E 2.57 3174 96 10.5 17.7 3171.34 49.42 54.36N 19.18E 57.65 N 19~44E 2.79 3268 94 12.8 22.6 3263.40 65.84 72.14N 25.79E 76.61 N 19.67E 2.66 3362 94 15.8 26.1 3354.47 86.71 93.25N 35.42E 99.75 N 20.80E 3.32 3457 95 18.4 31.4 3445.27 112.68 117.67N 48.93E 127.43 N 22.58E 3.19 3550 93 20.8 34.9 3532.88 142.47 143.74N 66.03E 158.18 N 24.67E 2.87 3645 95 23.1 38.4 3620.99 176.96 172.18N 87.26E 193.03 N 26.87E 2.78 3740 95 26.9 44.4 3707.09 216.58 202.16N 113.88E 232.03 N 29.39E 4.80 3835 95 28.3 46.5 3791.28 260.42 233.02N 145.25E 274.58 N 31.94E 1.79 PAGE 2 Company: BP EXPLORATION, Well: S 24, Location: PBU, Riq: NABORS 18E Meas Course True Vertical Coordinates Closure Dog Leg Depth Length Incl Azi Vert. Dp. Section N/S E/W Distance Angle Severity feet feet deg deg feet feet feet feet feet deg deg/100' ******************************************************************************************************* 3930 95 29.2 46.5 3874.57 306.01 264.47N 178.40E 319.02 N 34.00E 0.95 4022 92 31.4 45.8 3953.99 352.29 296.63N 211.86E 364.52 N 35.54E 2.42 4116 94 32.8 46.1 4033.62 402.09 331.36N 247.77E 413.75 N 36.79E 1.50 4212 96 33.4 46.1 4114.04 454.37 367.71N 285.54E 465.56 N 37.83E 0.63 4306 94 33.4 45.5 4192.52 505.94 403.79N 322.64E 516.85 N 38.63E 0.35 4400 94 34.3 45.3 4270.58 558.10 440.55N 359.92E 568.88 N 39.25E 0.97 4495 95 34.7 46.4 4348.88 611.74 478.03N 398.53E 622.36 N 39.82E 0.78 4588 93 35.7 45.9 4424.87 665.20 515.17N 437.18E 675.67 N 40.32E 1.12 4683 95 36.7 46.5 4501.53 721.15 554.00N 477.68E 731.50 N 40.77E 1.12 4774 91 37.4 45.7 4574.16 775.82 592.02N 517.19E 786.11 N 41.14E 0.93 4868 94 36.9 46.2 4649.08 832.41 631.49N 557.99E 842.69 N 41.46E 0.62 4963 95 36.5 46.7 4725.25 889.05 670.61N 599.13E 899.26 N 41.78E 0.53 5054 91 36.5 46.5 4798.40 943.06 707.80N 638.46E 953.21 N 42.05E 0.13 PAGE 3 Company: BP EXPLORATION, Well: S 24, Location: PBU, Riq: NABORS 18E Meas Course True Vertical Coordinates Closure Dog Leg Depth Length Incl Azi Vert. Dp. Section N/S E/W Distance Angle Severity feet feet deg deg feet feet feet feet feet deg deg/100' 5149 95 36.6 45.8 4874.72 999.48 746.99N 679.26E 1009.65 N 42.28E 0.45 5244 95 35.9 46.8 4951.33 1055.50 785.80N 719.87E 1065.69 N 42.49E 0.96 5338 94 35.4 47.5 5027.72 1110.20 823.06N 760.03E 1120.30 N 42.72E 0.69 5432 94 34.4 47.4 5104.81 1163.91 859.43N 799.65E 1173.91 N 42.94E 1.07 5527 95 34.2 46.6 5183.29 1217.35 895.94N 838.80E 1227.31 N 43.11E 0.52 5621 94 33.8 45.8 5261.22 1269.77 932.32N 876.74E 1279.80 N 43.24E 0.64 5716 95 32.8 46.5 5340.62 1321.78 968.45N 914.35E 1331.89 N 43.35E 1.13 5808 92 32.4 46.4 5418.12 1371.23 1002.60N 950.28E 1381.39 N 43.47E 0.44 5904 96 32.3 47.3 5499.22 1422.49 1037.74N 987.75E 1432.67 N 43.59E 0.51 5998 94 32.1 46.6 5578.77 1472.49 1071.93N 1024.36E 1482.68 N 43.70E 0.45 6092 94 32.2 46.9 5658.35 1522.41 1106.20N 1060.79E 1532.63 N 43.80E 0.20 6184 92 32.0 46.4 5736.28 1571.20 1139.76N 1096.35E 1581.47 N 43.89E 0.35 6280 96 31.7 46.0 5817.83 1621.73 1174.83N 1132.92E 1632.09 N 43.96E 0.39 PAGE 4 Company: BP EXPLORATION, Well: S 24, Location: PBU, Riq: NABORS 18E Meas Course True Vertical Coordinates Closure Dog Leg Depth Length Incl Azi Vert. Dp. Section N/S E/W Distance Angle Severity feet feet deg deg feet feet feet feet feet deg deg/100' ******************************************************************************************************* 6375 95 31.7 45.7 5898.65 1671.49 1209.60N 1168.74E 1681.99 N 44.02E 0.17 6470 95 31.8 44.8 5979.44 1721.28 1244.79N 1204.24E 1731.96 N 44.05E 0.51 6565 95 31.5 44.3 6060.31 1770.86 1280.31N 1239.21E 1781.81 N 44.07E 0.42 6660 95 31.2 43.9 6141.44 1819.99 1315.81N 1273.61E 1831.24 N 44.07E 0.38 6755 95 30.8 43.5 6222.87 1868.58 1351.18N 1307.41E 1880.16 N 44.06E 0.47 6850 95 30.5 44.3 6304.60 1916.70 1386.08N 1340.99E 1928.59 N 44.05E 0.53 6946 96 30.5 44.5 6387.31 1965.15 1420.89N 1375.08E 1977.31 N 44.06E 0.11 7040 94 30.0 44.7 6468.51 2012.27 1454.61N 1408.34E 2024.67 N 44,,~07E 0.53 7135 95 30.1 45.8 6550.74 2059.65 1488.11N 1442.13E 2072.24 N 44.10E 0.59 7230 95 30.3 45.8 6632.84 2107.28 1521.42N 1476.39E 2120.01 N 44.14E 0.21 7325 95 30.3 46.6 6714.87 2155.08 1554.59N 1510.98E 2167.91 N 44.18E 0.42 7420 95 30.7 47.1 6796.72 2203.21 1587.57N 1546.16E 2216.07 N 44.24E 0.50 7513 93 30.6 47.9 6876.73 2250.55 1619.60N 1581. llE 2263.41 N 44.31E 0.45 PAGE 5 Company: BP EXPLORATION, Well: S 24, Location: PBU, Riq: NABORS 18E Meas Course True Vertical Coordinates Closure Dog Leg Depth Length Incl Azi Vert. Dp. Section N/S E/W Distance Angle Severity feet feet deg deg feet feet feet feet feet deg deg/100' 7608 95 31.0 48.7 6958.32 2299.17 1651.96N 1617.44E 2311.94 N 44.39E 0.61 7703 95 31.5 49.1 7039.54 2348.44 1684.36N 1654.58E . 2361.08 N 44.49E 0.56 7797 94 31.7 50.4 7119.60 2397.69 1716.18N 1692.17E 2410.13 N 44.60E 0.76 7892 95 32.2 51.8 7200.21 2447.96 1747.75N 1731.30E 2460.08 N 44.73E 0.94 7988 96 32.4 53.1 7281.36 2499.22 1779.01N 1771.96E 2510.92 N 44.89E 0.75 8083 95 32.6 55.0 7361.48 2550.16 1808.97N 1813.28E 2561.32 N 45.07E 1.10 8115 32 33.0 54.9 7388.38 2567.44 1818.92N 1827.48E 2578.40 N 45.13E 1.29 8180 65 33.1 55.8 7442.86 2602.76 1839.08N 1856.64E 2613.30 N 45.27E 0.77 8276 96 33.6 56.7 7523.05 2655.26 1868.40N 1900.53E 2665.13 N 45.49E 0.73 8371 95 33.5 57.2 7602.22 2707.42 1897.03N 1944.53E 2716.60 N 45.71E 0.31 8464 93 34.1 57.0 7679.50 2758.81 1925.13N 1987.97E 2767.34 N 45.92E 0.66 8559 95 34.5 58.6 7757.98 2811.89 1953.65N 2033.27E 2819.74 N 46.14E 1.03 8654 95 34.5 59.1 7836.28 2865.12 1981.48N 2079.32E 2872.26 N 46.38E 0.30 PAGE 6 Company: BP EXPLORATION, Well: S 24, Location: PBU, Riq: NABORS 18E Meas Course True Vertical Coordinates Closure Dog Leg Depth Length Incl Azi Vert. Dp. Section N/S E/W Distance Angle Severity feet feet deg deg feet feet feet feet feet deg deg/100' 8749 95 34.4 59.1 7914.62 2918.24 2009.08N 2125.44E 2924.70 N 46.61E 0.11 8816 67 34.2 58.7 7969.96 2955.59 2028.58N 2157.77E 2961.60 N 46.77E 0.45 8905 89 34.5 59.2 8043.44 3005.25 2054.48N 2200.79E 3010.71 N 46.97E 0.46 9000 95 35.2 59.8 8121.40 3058.85 2082.03N 2247.56E 3063.72 N 47.19E 0.82 9093 93 35.9 60.9 8197.07 3112.11 2108.77N 2294.56E 3116.40 N 47.42E 1.02 9188 95 36.2 61.8 8273.88 3167.00 2135.58N 2343.62E 3170.68 N 47.66E 0.64 9283 95 37.1 61.5 8350.10 3222.62 2162.51N 2393.52E 3225.74 N 47.90E 0.97 9314 31 37.2 61.9 8374.81 3240.98 2171.38N 2410.01E 3243.92 N 47..98E 0.85 9410 96 38.2 62.4 8450.76 3298.46 2198.80N 2461.91E 3300.87 N 48.23E 1.09 9505 95 37.4 62.7 8525.83 3355.39 2225.64N 2513.58E 3357.32 N 48.48E 0.86 9599 94 36.4 63.4 8601.00 3410.46 2251.23N 2563.89E 3411.97 N 48.72E 1.15 9695 96 35.4 64.5 8678.76 3465.19 2275.95N 2614.46E 3466.32 N 48.96E 1.24 9787 92 34.4 67.0 8754.22 3515.95 2297.58N 2662.44E 3516.73 N 49.21E 1.90 PAGE 7 PLAN VIE~ Ser'v ~c.., 6400 BP EXPLORATION S 24 ;- PBU NABORS ~8E JOB# 757/00 SCALE: ~ inch = 800 feet + ' 56O0 4800 4000 3200 z © 2400 ~600 800 800 8OO 0 800 1600 2400 EAST(ft) 3200 4000 TE 'CO O lf eld Sepv ce VERTICAL PROJECTION -lO00 0 lO00 2000 73000 ©4000 >5000 6000 7000 BO00 9OOO lO00 2000 3000 4000 5000 474 ' .25- deg : 982 ' .01 deg 1497 ' 1.01 deg 1965 ' .75 deg BP EXPLORATION S 24 ' PBU NABORS 1BE JOB# 757/00 SCALE: ~ inch = I000 feet 2469 ' 1.2 deg 2731 ' ~.7 deg 2985 ' 6.0~ Oeg 3268 ' ~2.8 deg -~3550 ' 20.8 deg -~3835 ' 28.3 deg -k~4t16 ' 32.8 deg -~4400 ' 34.3 Oeg -~4683 ' 36.7 deg 4963 ' 36.5 deg -~5244 ' 35.9 deg -1~5527 ' 34.2 deg -t~5808 ' 32.4 deg -t~6092 ' 32.2 deg -t~6375 ' 3i.7 deg -k~6660 ' 31.2 deg -~6946 ' 30.5 deg -~7230 ' 30.3 deg -~7513 ' 30.6 deg -~7797 ' 31.7 deg -~8083 ' 32.6 Oeg -~837~ ' 33.5 Oeg -~8654 ' 34.5 deg N8905 ' 34.5 Oeg T188 ' 36.2 deg VERTICAL SECTION (ft) BP EXPLORATION PAD $ ($4-26-12-12) S 24 Controlled Drilling Consultants, Inc. CON ;ROLLED DRILLING CONSULI NTS, INC. P.O. Box 190560 Anchorage, Alaska 99519-0560 ~' (907) 333-1552 May 4,1990 Mr. Brian Rose BP Exploration Pouch 196612 Anchorage, Ak. 99519-6612 RE: Magnetic Single Shot Survey Job No.A-0490-023 Well: S-24 (34-26-12-12) Prudhoe Bay Field North Slope, Alaska Date of Survey: 4-23-90 to 5-4-90 Dear Mr. Rose: Please find enclosed the "Original" and twelve (12+ copies of our Magnetic Single Shot Survey on the above well. The method used in calculating this survey was Radius of Curvature. The depth of the survey was 474' to 9,695 '. Thank you for giving us this opportunity to be of service. Yours very truly, Controlled Drilling Consultants, Inc. Directional Supervisor HORIZONTAL VIEW B.P. EXPLORATION WELL '~-24 ~54-26-12-1E ) RADIUS OF CURVATURE MAGNETIC SINGLE SHOT SCALE= I" · I000' ': ................. ; ........................ '..: .... i ..... ;. !-; · ALL DEPTHS SHOWN ARE TVD 2000 2000. 5000 47 ~; 4, 9000 8123, 7969 7266 7200 ~' ,~ 8 ~_~_5 ............. Z55.5 .... F 5.0 ~ ?' 7_9 86'3? 7'866, 8.9 $t ........... ~. O.~-A ................ 9.12.Z 8255, ........... 93-0;! ..... 9428 8466, ,.,i 80 84 O' 0 ~ P i,J E L~ NEP. SURED 47.&4 50i5 ............ 5 i 3.9 5385 6566 ?, F~ ¢-, :-', ¢, A ,':,: r, { ~t~6- '4.~..~., 566 565 · ................... 66.6 66.6 ~ ........... 7.~ ~. .... ? ~ .~., 866 866, [ i :i66 J J 66, :; '~ 00 ................... .:~.~ ............ i .~, 1..:~.O :.~ 8 ........ i) 'i., 05 ~'~ ............... ..... : ...... ¢..~.~. ........ : ............. ¢-.~.¢.-~:~.00. .............................. :_..t=::~..:,¢ ................................... 2... ~,~_~&!. :~¢ .< ........ ,~ , ~": . . · ~> .......... ~.~-.O.O ........... 0 ............. O' ":._. -' 50.0 0 0 ~. ~.~. ,_~ 2.~66. 2600 :-';:.:-::::' ':' ".":'":-:..;'..',<: 8.~,~:;":'5::' '-: '-"'"-':" .................. 2886 2 ::;: * ¢'~ . 0 .... i'i'.L_:;A:~, DRiFT V~.'r-,T~:-',-',i i:;i!F.' i;'.!F:.]FT TO'?~L CO0~:{>~"~;~'i'ES C L ................................ ~49~ 34 42 ~$48 74 '~":'°2 49 ..... '"~ ....................... 5054 36 ~0 4797,79.. 4FTYS.. ,~.. . N~6.,50E 70~:*.,,~.~ , w, 642,27. . E 957'. , 06 ~'~.. 42 :~ .......... ...... 5027,7.~? ..... 4"~i_,.~..~: . ~;S.;~;.;7{.~._25....i;:~.. 7,~:~,4.2 i ~. ~ '~ 27; 28 ~:.. 5,,~-t~:.~.~...~g~ :5~.0,.~ 52.7'4~4.~- .... . I ~;~4,7 ~ ~ ~" ~X~ ~-:~ ~ ~' n~' D~ ~: ~ - ~ .... ,'". '~ '% ~ 4 -" ,' "? .'. -': ' .*'. ,~, ' .~ ,' ~'~, ....... ~ F.3LLOt,~.~,~.,G J:S EXTRRPOL~¥Eb TO TD i . . : · : i i i : : : : i i PERMIT#_ ~o - ~*'-5~ WELL NAME ..... ..- I .... AOGC'C GEoLO'G'I~L lvl~TI-'_"RIALS INVENTORY LIST [ check eft qr lis~ data as it is rec~..,iv,e,, d i, , 4[17 ! ~//'.~/~. d;i!lin§ histen/ ~// s.rve¥ ! t._~,~ I c°re a~sripti,.. I cereS, i~te~ls cere a.alysis [in/ditch in,re ,tva, is ~l!~]ital ~lata ~, ....... ,, .............. p/~-/o~ ~'~o Ill , Ill Il II I II I Ul Il I Il Ill Jl II I l _ III III III I II III I I I II I IIII I I I I I II I II I I III I I I LOG 1YP'E ........ RUN " INi:ERVAI_S H SCALE NO. ...... ~ f ,'~ -~ ...... ,, ~i - , ....... ,,, l]'] .................. ,~ ...... i '31 .... i~! .... i~ ............ , ,,,,,,, ,,, ,,,, , ......... .... , ,, , BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 TO: ARCO DATE: 06/01/90 EXXON T# 81196 PHILLIPS ~-'-~--T-A-T~E OF AL__~_A~ ARVHiVES SYSTEM Tape ~, Tr~,nsmittal Only BP MAGNETIC LI~ TAPE & I.,ISTING Enclosed is your copy of the matedal listed below. If you have any questions, please contact BP Well Records at (907) 564-4445. F-28 CH/CNL 05/21/90 # 8550-9296 TP#07073 Atlas#4356 1600bpi AP !#50-029-21649 N-17 CH/CN L 05/21/90 # At~,-2s#4357 1600bpi R-04 CH/CNL 05/19/90 # Atlas#4354 1600bpi S-24 CH/CNL 05/07/90 # Atlas#4315 1600bpi Z-22 CH/CNL, DIFL, 05/04/90 # Atlas#4034 1600bpi 8700-9268 TP#07074 ,~ ~--~f0 ~ AP!#50-029-20898 9100-9824 TP#07075 ~ ~'/~(~'/42' AP1#50-029-20374 9842-10365 TP#07076 ;z~ /?d~"~/~) AP1#50-029-22044 9700-14332 TP#07077 AP1#50-029-22037 ***ARCHIVES ONLY: Information Control Well Records LR 2-1 J. DietT_/S, McCurry Anchorage BP EXPLORATION M/f'7' 1 -8 1990 Nas~ 0ii & ~s Co.s. ~mission Anchorage TO: DISTRIBUTION Date: 05/16/90 T#:81149 BP Exploration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage. Alaska 99519-6612 (907) 561-5111 FROM: SUBJECT: Information Control Well Records LR2-1 BP CASED HOLE FINALS Enclosed is your copy of the matedai listed below, if you have any questions, please contact BP Well Records at (907) 564-4445. H~02 CNL/G R 05/12/90 #2 8450-8867 SCH 5" S-24 CBT 05/10/90 #1 9600-10360 SCH 5" S-24 CET 05/10/90 #1 9600-10379 SCH 5" S-24 GR 05/11/90 #1 9800-9960 SCH 5" Z-22 CET 05/09/90 #1 13150-14314 SCH 5" Z-22 CBT 05/09/90 #1 13150-14290 SCH 5" Z-22 DEPTH DETERMINATION05/-9/90 #1 13450-13670 SCH 5" Distribution: ARCO CHEVRON EXXON GEOSCiENCES MOBIL PHILLIPS RESERVOIR STATE OF ALASKA ARCHIYES .,o SOHIO PETROLEUM COMPANY BOP EQUIPMENT TEST REPORT DATE WELt. - ,,5"-_ 2. TEST FLUID - -./V ACCUMULATOR VOLUME TEST TYPE; Q WEEKLY ID FLANGE UP I:~g~A~ING SET BOP 8TACK-UST ALL ITEMS TOP TO BOTTOM, MANUFACTURER AND TYPE, SIZE OF RAMS, FTC, PRESSURE & PERFORMANCE TESTS: UNIt AHNULAR BLIND nAM PIPE RAM pipe RAM :: : -- 1,1.- -~_--.- ..... ? CHOKE MANIF, KI~LLY COCK #1 KELLY VALVE #2 .- : ~._ .... _:_ ___:~-: : INDUE BOP KELLY HOSE STAND PiPE _: -_--7 _: -- ~.--..~.. · .. . CHOKE UNE KJLL_LIN! TEST PRE.~,EURE TEST TIME ACCUMULATOR ACCUMULATOR ONLY TIME & PUMPS CLOSING CLOSING TiME TIME '~...._.._ _ ..-.=.;. _. .... ~- .... ~- _-:~ TEST TOOL' ~2~PLU CASING TE~; ACOUMU~TOR RECHARGE: 19 ~ Pa BEFORE TEST, ~~ PS1 AFTER CLOSING ALL BOP'S, I' ~IN. RECHARGE TIME. ~oP ~LL .... O0 ....SEC, TRIP O~LL :~ SEC. NITROGEN PRECHARGE: 1. 2. 3, 4. g. ~ 10, ..... 11. ~12. 13, 14 ...... - lS .... 16. ~OUIPUENT CHICKLIET YEB ..... _ - ~= .~ ~..,. _,;U,lJ~ ~_: ~ : ..... -. CIRCULATIN~ HI'AD ON ~LOOR' INSIDE BOP ON FLOOR & SU~ .... ~ .... K~LLY VALVE~ ON FLOOR & ....... ...... 0 P~ SYSTEM PE G STROKE COUNTER OPE~TINp TRIp TANK . ¢ . OPEn, Ti ~ASILY. REMOTE 8TATION OPE~N~ ....... BARITE ON HAND ...... -=_.- ''~ , y ...... 7 Z GEL ON HAND 3_0 I ~ WATER ON HAND .......... 3=~..? O SU~AC~ MUD VOLUU~ ~.~.SP HYD~ULIC all ON .AND ~ NITROGEN BACKUP 8YS, ~ : BO~LES HOOK~D UP, AT ~~~ NITROGEN PRESSURE ~ Z ~ MALFUNCTIONa & COMMENTS (Itemize all leak~, malfunctions, missing equfpment, etc., and at, lion taken.) SACKS SACKS ~BL DRUMS NO, OF · .,, SUPERVISOR: .... -=. ...... April 24, 1990 Telecopy~ (907)276-7542 G. W, Kirton PBU Lead Engineer BP Exploration (Alaska) !nc. P.O. Box 196612 Anchorage, Alaska 99519-6612 Re: Prudhoe Bay Unit S-24 BP Exploration (Alaska) Inc. Permit No. 90-55 Sur. Loc. 1633'S5rL, 4228'~ZL, Sec. 35, T12N, R12E, UM Btmhole Loc. 4490'SNL, 1297'WEL, Sec. 26, T12N, R12E, UM Dear Mr. Kirton: Enclosed is the approved application for permit to drill the above referenced well. The permit to drill does not exempt you from obtaining additional permits required by law from other governmental agencies, and does not authorize conducting drilling operations until all other required permitting determinations are made. To aid us in scheduling field work, please notify this office 24 hours prior to commencing installation of the blowout prevention equipment so that a representative of the Commission may be present to witness testing of the equipment before the surface casing shoe is drilled. Where a dtverter system is required, please also notify this office 24 hours prior to commencing equipment installation so that the Commission may witness testing before drilling below the shoe of the conductor pipe. .fqery ~.rul.M-..yours, ~ </ '? / .:' ...~.'/" ;. Chai~an of Alaska Oil and Gas Conservation Co~ission BY ORDER OF THE COM}~ISSION d!f Enclosure cc: Department of FiSh & Game, Habitat Section w/o encl. Dapartment of En;ironmental Conservation w/o encl. BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 April 18, 1990 Alaska Oil & Gas Conservation Commission 3001 Porcupine Dr. Anchorage, Alaska 99501 Attn: Mr. C. V. Chatterton S-24 (34-26-12-12) PBU Enclosed, in triplicate, is form 10-401, our Application for Permit to Drill the above named well. Also included are the attachments listed on the application form and a check in the amount of $100.00 to cover the permit filing fee. Yours very truly, G. W. Kirton PBU Lead Engineer GWK/KTH CC D. Hsu Well File RECEIVED .~. APR STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION PERMIT TO DRILL 2O AAC 25.OO5 la. Type of work Drill [] Redrill[-lllb. Type of well. Exploratoryr-I Stratigraphic Testr-I Development OilE] Re-Entry [] DeepenI-II Service [] Development Gas [] Single Zone [] Multiple Zone [] :2. Name of Operator 5. Datum Elevation (DF or KB) 10. Field and Pool BP Exo/oration KBE = 66' feet Prudhoe Bay Field/Prudhoe 3. Address 6. Property Designation Bay Pool P. O. Box 196612. Anchorac~e. Alaska 99519-6612 ADL 28257 4. Location of well at surf-ace 7. Unit or property Name 11. Type Bond(see 20 A~C 25.025 !633' SNL, 4228' WEL, SEC. 35, T12N, R12E Prudhoe Bay Unit At top of productive interval 8. Well number Number 4575' SNL, 1400' WEL, SEC. 26, T12N, R12E S-24 (34-26-12-12) 2S100302630-277 At total depth 9. Approximate spud date Amount 4490' SNL, 1297' WEL, SEC. 26, T12N, R12E May 10, 1990 $200,000.00 12. Distance to nearest 13. Distance to nearest well 4. Number of acres in property15. Proposed depth (MD and TVD) property line ADL 28258 @ 3981' feet S-04 @ 2630'/15' feet 2560 10230'MD/9213'TVDfeet 16. To be completed for deviated wells 17. Anticipated pressure (see 20 AAC 25.035 (e)(2)) Kickoff depth 2200'feet Maximum hole angle 30. ~,9 o Maximum surface 3330 pslg At total depth (TVD) 8800'/4390 psig 18. Casing program Setting Depth raze Specifications Top Bottom Quantity of cement Hole Casing Weight Grade Coupling Length MD TVD M D TVD (include stage data) 20" Cond. 80' Surface 110' 110' 17-1/2" 13-3/8" 68# L-80 Butt 2653' Surface 2683' 2680' 3300 cu ft Arcticset II and III 12-1/4" 9-5/8" 47# NT80-S NSCC 9715' Surface 9745' 8796' 2040 cu ft Class G 8-1/2" 7" 26# NT-80 NSCC 735' 9495' ! 8582' 10230' 9213' 256 cu fl Class G 19. To be completed for Redrill, Re-entry, and Deepen Operations. Present well condition summary Total depth: measured feet Plugs (measured) true vertical feet Effective depth: measured feet Junk (measured) true vertical feet Casing Length Size Cemented Measured depth True Vertical depth Structural ConductorRECEIVED Surface Intermediate ProductionAPR 1 8 ]990 Liner Perforation depth: measured true vertical 20. Attachments Filing fee [] Property plat [] BOP Sketch [] Diverter Sketch [] Drilling program [] Drilling fluid program [] Time vs depth plot [] Refraction analysis [] Seabed report[] 20 AAC 25.050 requirements l-I 21. I hereby certify that th? foregoing is true and correct to the best of my knowledge Signed -~, !,1-, Title PBU Lead En,qineer zTL/ / 2/~ Date Commission Use Only Permit; Number JAPI number JApp0:~/~12c~a/t~ 0 See cover letter ~,c:P-',~.~' [50-0~.~-- ~_. ~_.~ ~-/2,~ I / / ~ for other requirements Conditiohs of approval Samples rec[uir..ed [] Yes -~.No Mud log requi,[ed. []Yes~, 'NO Hydrogen sulfide measures [] Yes ~ No Directional survey required .]~[Yes [] No Required workin~ure/r~3r ~/E]'J2M; ..r-13~; ,,I~5M; I-IIOM; r-115M; - ~ Dy order of ,=_A.p._P ro:~ed, ~y,., _..~. :'~,_ ~_~'~ Co m missioner m ecom m,ssion Ddt Form 10-401 Rev. 12-1-85 Submit/ icate PROPOSED DRILLING AND COMPLETION PROGRAM 3Y_F.,L.L S-24 [34-26-12-12] PBU AFE No. 125208 Install and cement 80' of 20" conductor to surface. The drilling fluid program will consist of an 8.5 - 9.5 ppg spud mud in the 17- 1/2" hole, a 9.0 - 9.7 ppg water base mud in the 12-1/4" hole and a 8.8 ppg water base mud in the 8-1/2" hole. Drill 17-I/2" hole to 2700' TVD(BKB) and cement 13-3/8" L-80 Buttress casing to surface. Install blowout prevention equipment consisting of 5000 psi W.P. pipe rams, blind rams, and annular preventer. Maximum possible bottomhole pressure is 3710 psi at 8800' TVD(SS) based on original reservoir pressure. Maximum possible surface pressure is 3330 psi based on a gas column to surface from 8600' TVD(SS) and an oil column to 8800' TVD(S$). Directional drill 12-1/4" hole to the 9-5/8" casing point above the Sag River Sandstone. Run 9-5/8" 47# L-80 NSCC casing to within 5' of 12-1/4" TD and cement with Class G cement around the 9-5/8" shoe. The annulus will be freeze protected by dry crude. Directional drill 8-1/2" hole to TD. Run 7" liner from TD to 250' inside 9-5/8" casing shoe and cement using Class G cement. Clean out to 7" float equipment. Change over to NaCI completion fluid. Test casing and lap to 3000 psi. Run 9-5/8" production packer on tubing. Set packer 50' above top of liner. A subsurface safety valve with dual control lines will be placed 100' below base of permafrost. Install and test Xmas tree with diesel. Displace tubing to diesel. Set and test packer. Shut down rig operations for perforating subsequent to rig release. The well will be perforated in accordance with normal practices. Fluids incidental to the drilling of a well will be pumped down the 9-5/8" x 13- 3/8" annulus of the well. Tubing Size: 4-1/2", 12.6g L-80 TDS TBG with 5 GLM's. Tailpipe Size: 4-1/2", 12.6# L-80 TDS TAILPIPE DH: 4-3-90 20" Conductor .ELIMINARY WELL PLAI~ WELL $-2 4 [34-26-12-12] PBU PROPOSED DEPTH BKB I10' Ball Valve 2100' 13-3/8" Casing Shoe 17-1/2" Open Hole 2680' 270O' Cement Top 3230' 4-1/2" 12.6# L-80 TDS. Tubing with 5 GLM's 9-5/8" Packer 9445' 7" Tieback Assembly 9495' 9-5/8" Shoe 12-1/4" Open Hole 7" 26# NT-80 Liner 9745' 9750' 'APR 1 ': 1~0 Oii.& ~as Cons~. Commissim~ ~ ;~chora~e 7" PBTD 7" Liner Shoe 8-1/2" Open Hole 10150' 1O23O' 1O23O' PRELIMINARY WELL PLAN WELL: S-24 [34-26-12-12] PBU AFE NUMBER: 125208 LOCATION: Surface: 1633' SNL, 4228' WEL, Sec. 35, T12N, R12E Target: 4575' SNL, 1400' WEL, Sec. 26, T12N, R12E T.D.: 4490' SNL, 1297' WEL, Sec. 26, T12N, R12E ESTIMATED START: May 1990 OPR. DAYS TO COMPLETE: 22 Nabors 18E MAX ANGLE/SECT COURSEdKOP/BUILD RATE: 30.79/N 50.4 W/2200/2.5 !tom TVD(SS) MDt'BKBI Mud Wt. 20" CONDUCTOR 80 13-3/8" SHOE 2614 BASE WEST SAK FORMATION 5200 9-5/8" S HOE 873 0 TOP SAG RIVER SANDSTONE 8740 TOP SADLEROCHIT 8 875 TARGET 8922 TOTAL DEFFH 9147 110 8.5 2683 9.5 5635 9.0 9745 9.7 9755 9.0 9912 9.0 9967 9.0 10230 9.0 LOGGING PROGRAM: Open Hole - Record all logs on magnetic tape where applicable. 12-1/4" Hole: DIL/LCT/CNL/GR: (Optional mudlogger for Kupamk and Ugnu evaluation) 8-1/2" Hole: DIL/BHC/CNL/GR (Optional LDT) Cased Hole CBT/CET/ Gyro and perforate after rig release. DH: 4-3-90 BOP STACK CONFIGURATION 13 5/8", 5000 PSi WP TRIPLE RAM STACK DRILLING RISER ANNULAR PREVENTER , , I I I PI PE RAMS 2" KILL LINE MANUAL HYDRAULIC GATE GATE I I ,m I BLIND RAMS ~ · i DRILLING SPOOL PI PE RAMS 4" CHOKE LINE HYDRAULIC MANUAL GATE GATE i i 04 OI 02 °,I I0 20 S-3 Act~ol ) 3O 40 0 20 30 I 3515" ~-I ' i ( Proposed )7~8' J WELLS 20 -- , m - . CJ 0 0 (Actua I - -= ..... rA ~-~--~J - ~ s= Ia - ~ .......... : i / ~ (~c,~,) /I ~oo'~ 400'~ ~ ~gu -~ ~ (Proposed) I ~ ~ S-26 (Proposed) S-51 J LAT = 70°21'15 01"~ ,~-~ -, -- 1605' ~ ~J X: 61899 J . ~ i ~ ' (Proposed)~~ ~I ~c ~ ~J c ~j ~ I100' J J ~'9'~{Prepcse~) ? 1'~ T 12 IN S-~{A~,~o~)I t ~ t t T~t _ . I ' I ' ' ~ I O/ g t oposea)T , ~ I ' ' ..... J . ~_S:~__. _ ~ __ . (Pr~po~ed) .. . S j(~'~) 2 ~ J I s-.~o~o~..)j ~,oo' _J PORTION OF T !! & 12NU~ 12E,O.'M. SCALE I": I/2 MILE PAD DETAIL SCALE I"= 400' CERTIFICATE OF SURVEYOR 1 hereby certify that lam properly registered to practice land surveying in the State of Alaska and that this plat represents a location survey of the wellpad shown and the wells thereon. This survey was made by me or under my supervision and all dimensions and other details are correct. Bottom hole locations are furnished by others. Date Surveyor ADDED PROPOSED BHL 5-24 81 S-26 4/16/90 ADDED PROPOSED BHL S-21 ADDED PROPOSED BHL S-20 (~.. 7/22/86 ADDED PROPOSED BHL S - 19 i~~ 4 /2/86 ADDED PROPOSED BHL S-12A 7/31/85 REVISED PROPOSED BHL S-4& §. ~, 5/9/83 ADDED PROPOSED OHL S-4 {55. ¢'/ II/iO/8~ ADDED ACTUAL 8HL S. t RD, S-2,&S-3; REVISED PROPOSED 8HL ~-Lr~ 9/27/82 S-8 TOACTUAL ; REVISED PROPOSED S-6. ADDED PROPOSED BHL S-6 ~7. '?.~-.:'~ 8/31/82 ADDED PROPOSED BHL S-IS;ADDED ACTUAL BHL S-9; ,~-~ 8/12/82 ADDEDREVISED PROPOsEDBHL S- IO,BHLII,&s_I214FROM PROPOSED TO ACTUAL. ¢__....~,~ 7/30/82 ADDED PROPOSED BHL S-8. ~L~. 7/ 7/82 REVISED BHL S.IO & II ~ DELETED BHL S-7,8,~9. ~-~ 6/ 8 /SZ ADDED PROPOSED 8HL S-7,8,9,8, lO. ~ 5/24/82 PA D "S" Lo coted in NE I/4 PROTRACTED SEC.35,T. IZN.,R. I2 E.,UMIAT MERIDIAN, AK. Surveyed for SOHIO ALASKA PETROLEUM CO. Surveyed by F. M. LINDSEY & ASSOC. LAND & HYDROGRAPHIC SURVEYORS 2502 West Northern Lights Boulevard Box 4-081 Anchorage, Alaska A. 12588 - el $.URFACF HOLE DIVER.TER ~YSTEM Two lines venting 90 deg. apart in directions that ensure safe down wind venting, and ex- tending to a point at least 100' from any potential source of ignition. 10" ~ Valves '35' or as required Dresser Sleeve 10" Diverter Line 1. All pipe connections 150# ANSI Flanges or welded connections and secured to prevent movement. 2. Manual 10" ~ valve§ mechanically connected to ensure that one valve is fail-safe open at all times. 3. All turns are 90 deg. and targeted. 10" Full opening bali valve w/Hydraulic Actuator Cellar 20" Diverter Spool w/10" Side Outlet KRL 12/18/89 .... ,~- 14:49 Page 1 Search Radius= 200 COURSE LINE For proposed well: S24 [34-26-12-12] Location = W-E S-N TVD(SBS) Top 619212.00 5979855.00 -66.00 Bottom 622103.33 5982325.44 9147.91 3-APR-1990 .... Closest Approach Analysis --- Date: 3-APR-90 Time: 14:49:17 Note: Ail depths in feet Below Kelly Bushing (BKB) Closest Approach WELL IDENT /PROPOSED% /NEARBY% TVD DEPART TVD DEPART A029-2069500 S-3 A029-2069800 S-2 A029-2072800 S-11 A029-2072900 S-12 A029-2076500 S-10 A029-2077100 S-9 A029-2077800 S-8 A029-2080400 S-14 A029-2081000 S-13 A029-2082900 S-7 A029-2083900 S-6 A029-2086900 S-5 A029-2095900 S-4 A029-2111300 S-15 A029-2112300 S-16 A029-2141900 S-12A A029-2161100 S-19 A029-2163700 S-20 1098.9 2200.0 3681 1 3602 3 4623 0 3388 9 3364 7 3740 3 359[ 6 139S 6 3022 i ~889 2630 3 2200 0 2300 0 3593 7 195 3 2200 0 0.0 1100.0 7.1 0.0 2203.6 18.4 506.5 3594.3 47.3 459.5 3382.5 147.1 1067.7 4615.0 557.4 332.4 3365.3 81.9 318.1 3357.8 30.0 541.8 3487.3 113.1 453.1 3392.1 93.4 0.0 1399.8 6.2 176.7 3082.9 15.1 106.2 2897.6 10.5 41.3 2638.3 16.5 0.0 2217.6 111.0 2.2 2326.3 200.2 454.4 3440.6 88.3 0.0 200.0 O.8 0.0 2206.2 59.1 Vertical CLOSEST /PROPOSEDN DISTANCE TVD DEPART 70.2 166.2 532.6 783.2 403.1 423.8 317.7 921 6 854 2 363 0 170 1 104 3 15 3 394.5 412.2 738.8 216.9 117.7 Intersection /NEARBY~ TVD DEPART VERTICAL DISTANCE S UMMAR Y , .j .._=~u~A~_~HoR%.LIS;22 3-APR-1990 14:49 Page 2 The well which comes closest to the proposed well is: A029-2095900 S-4 Closest approach distance = KICK OFF for this run = 15.3 feet 2200.0 feet $45DUA124:[DRAN034]S24 CLOSAP SHORT7.LIS;5 Search Radius= 200 7 DEGREE LEAD LINE For proposed well: S24 [34-26-12-12] Location = W-E S-N TVD(SBS) Top 619212.00 5979855.00 -66.00 Bottom 621780.71 5982659.39 9147.91 Note: Ail depths in feet Below Kelly Bushing (BKB) 3-APR-1990 ----- Closest Approach Analysis --- Date: 3-APR-90 Time: 14:46:54 14:47 Closest Approach WELL IDENT /PROPOSED~ /NEARBY% TVD DEPART TVD DEPART A029-2069500 S-3 A029-2069800 S-2 A029-2072800 S-11 A029-2072900 S-12 A029-2076500 S-10 A029-2077100 S-9 A029-2077800 S-8 A029-2080400 S-14 A029-2081000 S-13 A029-2082900 S-7 A029-2083900 S-6 A029-2086900 S-5 A029-20959 S-4 A029-2111 S-15 A029-2!!2300 S-16 A029-2141900 S-12A A029-2161!00 S-19 A029-2163700 S-20 1098.9 2200.0 3576.9 3481.6 4085 5 3335 6 3313 3 3614 4 3478 7 1398 6 3024 3 2843 3 2619 8 2200 0 2300 0 3447 5 !95 3 2200 0 0.0 0.0 444.4 387.6 747.4 301.4 289.1 466.7 385.9 0.0 153.9 92.7 39.2 0.0 2.2 367.3 0.0 0.0 1100.0 2203.6 3495.4 3288.4 4036.4 3320.2 3310.2 3392.0 3295 3 1399 8 3024 9 2851 4 2627 7 2217 6 2326.3 3296.1 200.0 2206.2 7.1 18.4 49.4 113.4 363.1 70.4 23.5 83.5 69.0 6.2 15.0 10.3 16.5 111.0 200.2 57.9 0.8 59.1 Vertical CLOSEST /PROPOSED~ DISTANCE TVD DEPART 70.2 166.2 588.3 827.8 515.6 462.4 354.7 974.8 900.5 363.0 190.3 116.5 20.2 394.5 412.2 784.9 216.9 117.7 Intersection _~ 7 /NEARBY~ ~ TVD DE PART~_.~ Page 1 VERTICAL DISTANCE SUMMARY $45DUA124:[DRAN034]S24 CLOSAP SHORT7.LIS;5 The well which comes closest to the proposed well is: A029-2095900 S-4 3-APR-1990 14:47 Page 2 Closest approach distance = KICK OFF for this 'run = 20.2 feet 2200.0 feet ~IL.L TAM/C - Choke Manifold - Poor Boy Degasser · - Brandt VacuumvType Degasser - Brand t Dual Tandem Shale Shaker - Pioneer Mud Cleaners - Pioneer MKI Centrifuge TO pIT WATER TRIP TANK, 75' B~L I~0 88L. DISTRIE~ITION OlTC / ,.,' ,.,, 'TO PIT TYPE 1 - RecOrding drilling fluid, pit 'level indicator with both visual and audio warning de~ices at driller's console ' · 1 - Trip Tank (75 BBL.) 1 - Drilling fluid flow sensor with readout at driller's console 11 - 5 Hp AgitatOrs j, MUD WEIGHT CALCULATIONS WELL S-24 (34-26-12-12) Mud Wt. (8-1/2" Hole): P @ Sag River: P @ Sadlerochit: P @ Top Sadlerochit: OB @ Sag River: OB @ Top Sadlerochit: Current GOC: 9-5/8" Casing Shoe: Top Sag River: Top Sadlerochit: 8.8 ppg. 3850 psi. 3750 psi. at 8800' TVDSS 3752 psi. 240 psi. 402 psi. Not Present 8797' TVDBKB 8806' TVDBKB 8941' TVDBKB CEMENT CALCULATION 13-3/8" CASING Measured Depth: Basis: Total Cement Vol: Lead Slurry Vol: Tail Slurry Vol: 9-5/8"CASING Measured Depth: Basis: Total Cement Vol: Lead Slurry Vol: Tail Slurry Vol: 7" LINER Measured Depth: Basis: Total Cement Vol: 2684' 2 X Annular Volume 3300 cuft 2010 cuft (1036 Sx Arcticset III @ 1.94 Cu ft/Sk) 1290 cuft (1387 Sx Arcticset II @ 0.93 Cu ft/Sk) 9745' 90% Annular Volume to 13-3/8" + 50 cuft 2040 cuft 1465 cuft (819 Sx G+8% @ 1.79 Cu ft/Sk) 575 cu ft (500 Sx Neat G @ 1.15 Cu ft/Sk) 10230' (Hanger) - 9495' (Shoe) 1.5 X Annular volume to 9-5/8" shoe + 150 cuft 256 cuft (220 Sx @ 1.16 Cu ft/Sk) DH: 4-3-90 CHECK LIST FOR NEW WELL PERMITS ITEM APPROVE DATE (1) Fee ~ ~ 1. (2 thru (8) (3) Admin ~. _~_ /-/~~g5 9. ~(9 thru'fjy' ' 10. (10 ~ 13) 12, 13, (4) Cas~ ~ ~-~¢-~ (~4 t~u 22) (5) BOPS. (23 th~u 28) Company _~/D ~'~. ~z~/, Is the permit fee attached ...~ ...................................... ~ Lease& Well No. YES NO 2. Is well to be located in a defined pool ............................. 3. Is we_l] located proper distance from property line .................. 4. Is we~i located proper distance from other wells .................... 5. Is suzficient undedicated acreage available in this pool ............ 6. Is well to be deviated and is wellbore plat included ................ 7. Is operator the only affected party ................................. 8. Can permit be approved before fifteen-day wait ...................... 14. 15. 16. 17. 18. 19. 20. 21. 22. Does operator have a bond in force .................................. Is a conservation order needed ...................................... Is administrative approval needed ................................... Is the lease'number appropriate ..................................... Does the well have a unique name and number ......................... Is conductor string provided ........................................ Will surface casing protect all zones reasonably expected to serve as an underground source of drinking water ..................... Is enough cement used to circulate on conductor and surfaCe ......... Will cement tie in surface and intermediate or production strings ... Will cement cover all known productive horiZons .................... Will' all casing give adequate safety in collapse, tension and burst.. Is this well to be kicked off from an existing wellbore ............. Is old wellbore abandonment procedure included on 10-403 ............ Is adequate wellbore separation proposed ............................ Is a diverter system required ............... ~ ........................ Is the drilling fluid program schemati6 and list of equipment adequate~ Are necessary diagrams and descriptions of diverter and BOPE attached. Does BOPE have sufficient pressure rating - Test to Does the choke manifold comply w/API RP-53 (May 84) .................. Is the presence of H2S gas probable ................................. 23. 24. 25. 26. 27. 28. (6) OTHER thru ~1) Geology: Engineering DWJ_]~~LCS ~/BEw rev: 01/30/89 6.011 For 29. 30. 31. exploratory and Stratigraphic wells: Are data presented on potential overpressure zones? ................. Are seismic analysis data presented on shallow gas zones ............ If an offshore loc., are survey results of seabed aonditions presented-- 32. Additional requirements .................................. INITIAL GEO. UNIT ON/OFF POOL CLASS STATUS AREA NO. SHORE Well History File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history file. To improve the readability of the Well History file and to simplify finding information, information-of this nature is accumulated at the end of the file under APPENDIX. No special 'effort has been made to chronologically organize this category of information. PROGRAM: LISCAN REVISION: 5.2 PART NUMBER: Start of execution: Fri 28 SEP 90 2 40p **** REEL HEADER **** LIS 90/05/07 ATLAS 01 'LIS CUSTOMER FORMAT TAPE' **** TAPE HEADER **** LIS 90/05/07 4315 01 'OPEN HOLE-DIFL,CN-GR,AC,C.H.CN-GR: RANGE 7200-10427 FT' W5790-MI CRO ~~~ FILE # 1 MAIN . 001 **** FILE HEADER **** 1024 CN WN FN COUN STAT : BP EXPLORATION (ALASKA) : S - 24 : PRUDHOE BAY : NORTH SLOPE : ALASKA * COMMENT RECORD * MAIN PASS Oate_ * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME TAPE DEPTH UNIT : FT 15 CURVES : NAME CODE SAMPLE# UNIT BYTES 1 CILD 2 SP 3 CSSN 4 CLSN 5 GR 6 TEMP 7 CHT 8 TTEN 9 SPD 10 AC 11 RFOC 12 RILD 13 RILM 14 CN 15 CNC 68 68 68 68 68 68 68 68 68 68 68 68 68 68 68 1 1 · 1 1 1 1 1 1 1 1 1 1 1 1 1 OHMM 4 MV 4 CTS 4 CTS 4 API 4 DEGF 4 LB 4 LB 4 F/MM 4 US/F 4 OHMM 4 OHM~ 4 OHMM 4 PCT 4 PCT 4 * DATA RECORD DEPTH GR AC CNC 10460.000 -999.2500 -999.2500 -999.2500 10410.000 0.0000000E+00 85.32265 0.0000000E+00 10360.000 25.21829 77.32347 20.45949 10310.000 59.60445 80.49948 24.32968 10260.000 30.09073 92.08875 28.73766 10210.000 26.86842 79.90031 22.17409 10160.000 24.96931 97.94127 27.86064 (TYPE# CILD TEMP RFOC -999.2500 -999.2500 -999.2500 173.5758 100.0000 24.17007 320.6379 174.1385 7.799210 350.3645 174.8596 7.231995 620.0581 175.1834 6.496395 379.0674 174.9997 7.567369 232.6818 174.7867 9.633913 o) 966 BYTES * Sp CHT RILD -999.2500 -999.2500 -999.2500 -111.4890 1148.933 5.761171 -75.20915 1195.492 3.118783 -53.90703 1126.682 2.854171 -76.32520 1061.003 1.612752 -70.53812 1028.913 2.638054 -58.46420 1033.378 4.297714 CSSN TTEN RILM -999.2500 -999.2500 -999.2500 100.0000 5225.352 6.665013 283.0522 5313.406 3.077531 271.2429 5186.859 3.276601 235.0643 5036.996 1.817803 277.8806 4966.305 3.037600 230.4437 4942.727 4.501137 CLSN SPD CN -999.2500 -999.2500 -999.2500 35.00000 19.99800 0.0000000E+00 122.7153 19.99800 16.45949 103.3985 20.99791 20.32968 78.88011 20.99791 24.73766 113.5547 20.99791 18.17409 79.20041 20.99791 23.86064 10110.000 28.76720 87.86086 23°10857 148.5112 174.4132 13.00959 -66.45320 1046.595 6.733498 257.6655 4934.941 6.532653 102.1040 20.99791 19.10857 10060.000 24.80389 87.18701 25.65067 87.58772 173.9635 17.25310 -72.04124 1112.726 11.41713 251.5078 5090.512 10.48327 92.09941 20.99791 21.65067 10010.000 55.94576 79.76070 21.13879 69.86104 173.3052 26.07054 -44.50117 1209.452 14.31413 262.4331 5214.449 14.04135 111.0926 20.99791 17.13879 9960.000 111.1550 55.79633 10.64905 10.97462 172.0291 317.5312 -13.46415 1236.589 91.11934 420.4421 5212.344 115.4148 282.8359 20.88870 6.649049 9910.000 110.5996 82.60513 28.46233 90.07951 170.6349 9.633665 -43.93030 1184.122 11.10130 220.4981 5125.551 10.76721 74.54390 20.99791 24.46233 9860.000 53.31384 84.29329 25.28685 74.04555 169.4723 17.55092 -78.08331 1192.750 13.50520 251.3692 5080.961 13.31403 93.05670 20.99791 21.28685 9810.000 80.55191 61.43976 54.41936 0.0000000E+00 167.9307 0.2000000 -80.00000 500.0000 0.2000000 140.4661 3500.000 0.2000000 30.32150 0.0000000E+00 50.41936 9760.000 73.53424 50.00000 0.0000000E+00 0.0000000E+00 166.0499 0.2000000 -80.00000 500.0000 0.2000000 100.0000 3500.000 0.2000000 35.00000 0.0000000E+00 0.0000000E+00 TOTAL DATA RECORDS : STARTING TAPE DEPTH = **** FILE TRAILER **** 98 10460.00 ENDING TAPE DEPTH = 9730.00 FILE # 2 REPEAT. 002 **** FILE HEADER **** 1024 * COMMENT RECORD * REPEAT SECTION * FORMAT RECORD (TYPE# 64 ) ONE DEPTH PER FRAME TAPE DEPTH UNIT : FT 15 9 10 11 12 13 14 15 CURVES : NAME CODE SAMPLE# UNIT 1 CILD 68 1 OHMM 2 SP 68 1 MV 3 CSSN 68 1 CTS 4 CLSN 68 1 CTS 5 GR 68 1 API 6 TEMP 68 1 DEGF 7 CHT 68 1 LB 8 TTEN 68 1 LB SPD 68 1' F/MM AC 68 1 US/F RFOC 68 1 OHMM RILD 68 1 OHMM RILM 68 1 OHMM CN 68 1 PCT CNC 68 1 PCT BYTES 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 * DATA RECORD DEPTH GR AC CNC 10460.000 -999.2500 -999.2500 -999.2500 10410.000 0.0000000E+00 85.25053 0.0000000E+00 10360.000 24.63568 77.00237 21.52084 10310.000 68.31822 79.73163 23.74403 10260.000 28.16924 90.81288 (TYPE# 0 ) CILD TEMP RFOC -999.2500 -999.2500 -999.2500 175.4157 100.0000 21.57869 311.1655 174.1030 7.510366 351.3269 176.1560 7.181579 629.0161 177.5781 5.619957 966 BYTES * SP CHT RILD -999.2500 -999.2500 -999.2500 -113.4225 1168.270 5.700742 -81.12212 1222.928 3.213723 -65.41977 1143.860 2.846352 -78.21169 1174.694 1.589785 CSSN TTEN RILM -999.2500 -999.2500 -999.2500 100.0000 5191.957 6.480078 288.9143 5388.758 3.189616 285.9795 5152.941 3.115182 239.6425 5191.156 1.812968 CLSN SPD CN -999.2500 -999.2500 -999.2500 35.00000 18.99811 0.0000000E+00 120.7026 19.99210 17.52084 111.0392 19.99800 19.74403 76.50261 19.99800 26.65648 30.65648 10210.000 25.88657 79.72256 24.12642 10160.000 25.38486 99.27913 27.88091 10110.000 30.51590 87.65450 26.17975 10060.000 23.37627 89.47182 27.39392 10010.000 62.01610 79.24263 21.78339 9960.000 105.5381 55.62799 10.94351 9910.000 110.7448 81.65230 27.57159 9860.000 57.28955 84.29735 26.42351 9810.000 82.92026 63.01054 57.84903 9760.000 73.95909 50.00000 0.0000000E+00 387.6025 177.8253 7.854506 231.5950 177.5867 8.499338 147.4296 177.0789 12.61961 88.73268 176.5745 15.82853 69.41618 176.0045 20.89778 10.84525 174.9112 319.4050 91.24371 173.4466 9.672014 72.3724'2 172.2145 17.96680 0.0000000E+00 170.6435 0.2000000 O.O000000E+00 168.5949 0.2000000 -68.80298 1081.381 2.579963 -58.59248 1061.596 4.317883 -67.69626 1062.300 6.782899 -74.85979 1088.938 11.26980 -38.18129 1207.707 14.40586 -8.260252 1256.810 92.20627 -34.18463 1184.180 10.95966 -76.88678 1194.512 13.81742 -216.9719 500.0000 0.2000000 -80.00000 500.0000 0.2000000 287.6233 5062.457 2.976805 239.7450 4987.098 4.526367 264.2676 4960.738 6.532558 251.5424 5021.840 10.20244 261.9827 5238.266 14.40480 432.1245 5263.633 114.6908 230.5020 5122.211 10.32534 253.5144 5090.715 13.53117 139.9963 3500.000 0.2000000 100.0000 3500.000 0.2000000 110.3402 19.99800 20.12642 82.35101 19.99800 23.88091 95.27321 19.99800 22.17975 87.58380 19.99800 23.39392 108.4763 19.99800 17.78339 285.7795 19.99800 6.943512 79.85941 19.99800 23.57159 90.75000 19.99800 22.42351 29.26140 0.0000000E+00 53.84903 35.00000 0.0000000E+00 0.0000000E+00 TOTAL DATA RECORDS : STARTING TAPE DEPTH = **** FILE TRAILER **** 97 10460.00 ENDING TAPE DEPTH = 9740.00 FILE # 3 C.H.CN. 003 **** FILE HEADER **** 1024 * FORMAT RECORD (TYPE# 64) ONE DEPTH PER FRAME TAPE DEPTH UNIT : FT CURVES : NAME CODE SAMPLE# UNIT BYTES 1 CSSN 68 1 CTS 4 2 CLSN 68 1 CTS 4 3 GR 68 1 API 4 4 TEMP 68 1 DEGF 4 5 CHT 68 1 LB 4 6 TTEN 68 1 LB 4 7 SPD 68 1 F/MM 4 8 CN 68 1 PCT 4 9 CNC 68 1 PCT 4 * DATA RECORD DEPTH CHT (TYPE# 0) 1006 BYTES * CSSN CLSN TTEN SPD GR CN TEMP CNC 9860.000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 9810.000 143.6024 30.61540 83.86659 165.3424 1211.236 5071.695 42.99571 50.83946 47.94441 9760.000 134.5976 27.07080 81.43213 165.8864 1218.243 5073.215 42.99571 59.03842 55.22501 9710.000 131.7354 23.33839 85.13902 165.9130 1207.093 4995.203 43.65060 65.48935 60.95340 9660.000 126.7032 28.97461 82.16045 165.4346 1219.212 5Oll.277 42.99571 49.29791 46.57552 9610.000 129.6405 28.05760 77.33931 164.7070 1226.930 4981.785 43.23151 55.50874 52.09068 9560.000 1226. 125 9510.000 1214.635 9460.000 1185.747 9410.000 1193.069 9360.000 1198.660 9310.000 1192.262 9260.000 1197.619 9210.000 1218.850 9160.000 1203.853 9110.000 1210.593 9060.000 50O.00OO 9010.000 1202.516 8960.000 1211.902 8910.000 1222.422 8860.000 1230.551 141.7560 4949.262 165.3679 4903.922 144.1657 4828.738 164.2289 4825.637 151.3415 4831.898 162.6309 4791.727 136.9269 4778.422 133.8855 4821.453 138.7032 4767.551 125.0027 4718.945 117.9309 3500.000 125.4949 4712.848 127.3701 4708.148 127.9480 4665.742 1-32.2218 4666.187 30.38791 44.75970 42.25021 44.34061 35.56561 44.23141 37.87201 43.99561 38.67300 44.23141 43.89661 44.99550 34.19791 44.75970 32.33850 44.10481 32.78911 43.99561 21.14880 44.88631 21.75461 0.0000000E+00 23.57761 40.99591 28.42700 40.99591 28.78560 40.99591 32.54820 41.99580 82.90149 52.23282 56.39140 37.79030 64.20436 37.36728 52.72586 39.51920 50.92216 36.60078 51.45450 34.83980 63. 12102 40.32712 49. 19025 41.07013 40.72055 40.08430 62.75089 67.52957 65.51869 71.24266 68.85818 62.23277 69.09808 54.73874 54.47797 53.44766 49.76118 41.11079 163.8630 49.18169 163.0743 36.35684 162.6034 35.98120 162.1833 37.89209 161.6165 35.30057 161.0198 33.73682 160.4819 38.60951 159.9282 39.26930 159.2192 38.39391 158.6139 62.76509 157.9203 66.06227 158.3137 58.06157 157.1669 51.40694 156.3650 50.26045 156.0168 39.30540 8810.000 1222.496 8760.000 1226.516 8710.000 1235.365 8660.000 1216.280 8610.000 1237.190 8560.000 1231.188 8510.000 1229.320 8460.000 1221.538 8410.000 1224.392 8360.000 1241.512 8310.000 1228.630 8260.000 1228.779 8210.000 1225.595 8160.000 1241.485 8110.000 1233.106 142.6512 4589.469 133.0004 4566.332 136.0510 4552.422 133.3619 4540.574 130.8296 4543.301 123.8641 4497.070 127.4459 4468.203 122.8983 4443.184 121.1635 4406.410 120.6123 4418.559 '122.2647 4387.727 119.8087 4366.051 134.0474 .4322.746 125.8529 4325.809 122.5733 4276.809 32.36349 41.99580 34.14571 41.96010 32.61690 41.59550 31.20250 41.99580 25.44360 41.99580 23.37700 41.03751 26.52051 41.59550 26.23500 41.99580 23.99390 41.99580 25.39771 41.98990 26.43140 41.99580 23.35989 41.99580 28.24170 41.99580 22.84840 41.99580 26.56331 42.99571 48.52939 43.46393 46.29814 40.63663 45.72079 39.01379 47.01207 39.41609 55.28027 55.00082 66.63684 59.54610 55.56821 59.40843 61.14325 53.02339 61.48575 74.84023 65.05702 54.30299 65.97353 52.86728 59.90558 55.41972 47.74719 49.27884 54.29535 66.59036 50.50470 52.84300 155.7520 41.39497 155.4000 38.88434 155.1252 37.44328 154.7176 37.80052 154.0758 51.63965 153.2082 55.67581 152.3043 55.55356 151.5502 49.88368 150.6991 69.25688 149.9587 51.01997 149.4957 49.74509 149.0559 52.01163 148.5258 46.55856 147.9820 61.93106 147.4388 49.72353 8060.000 1247.755 8010.000 1241.924 7960.000 1235.085 7910.000 1241.185 7860.000 1238.496 7810.000 1250.753 7760.000 1235.931 7710.000 1237.779 7660.000 1242.749 7610.000 1240.622 7560.000 1238.015 7510.000 1219.658 7460.000 1215.672 7410.000 1217.618 7360.000 1241.244 126.3044 4317.906 126.7297 4266.789 123.0397 4217.812 125.1982 4202.238 141.0141 4165.391 124.7559 4171.430 123.2159 4141.516 129.8182 4135.445 128.1321 4105.785 126.5852 4068.682 127.7333 4081.479 118.8142 4021.932 127.1396 4015.662 129.6940 3995.154 134.5305 3980.614 24.71021 42.95410 25.39711 42.98981 27.19710 42.99571 26.46001 42.59541 26.88541 42.99571 24.92480 42.58951 24.72720 42.43771 25.88451 42.99571 24.69301 42.96001 25.98720 42.58951 25.65630 42.96001 23.35490 42.99571 28.00441 42.99571 28.38631 42.99571 34.18361 42.43771 56.69386 56.10312 60.08765 60.90855 59.29344 52.21657 59.85997 55.51627 45.16188 66.61671 63.83458 59.45663 58.94420 57.31389 62.38309 60.92451 59.52243 54.65941 56.19174 52.98622 51.66772 51.32144 53.25755 57.42537 52.16405 49.94054 53.08450 46.26895 38.30496 38.17429 146.8982 52.61845 146.3705 56.88562 145.7639 49.16719 145.2818 52.09734 144.6721 61.95444 144.1565 55.59636 143.5598 53.69362 143.0186 56.89981 142.4718 51.33643 141.9947 49.85066 141.4318 48.37238 140.7816 53.79259 140.3525 47.14610 139.8839 43.88577 139.4421 36.69775 7310.000 114.3275 21.86040 122.5595 139.0192 1226.793 3941.220 43.99561 70.47572 65.38120 7260.000 136.9167 30.23480 66.51221 138.5340 1225.753 3944.741 43.59531 47.69873 45.15540 7210.000 131.4458 25.71671 500.0000 3500.000 0.0000000E+00 89.87257 54.60019 138.0374 51.28383 TOTAL DATA RECORDS : STARTING TAPE DEPTH = **** FILE TRAILER **** 213 9860.00 ENDING TAPE DEPTH = 7200.00 **** TAPE TRAILER **** LIS 90/05/07 4315 01 TOTAL RECORDS IN THIS LOGICAL TAPE : 423 **** REEL TRAILER **** LIS 90/05/07 ATLAS 01 TOTAL RECORDS IN THIS LOGICAL REEL : 424 TOTAL RECORDS IN THIS PHYSICAL REEL: 424 End of execution: Fri 28 SEP 90 2:41p Elapsed execution time = 45.37 seconds. SYSTEM RETURN CODE = 0 PROGRAM: LIS' Start of execution: REVISION: 4.1 PART NUMBER: W5550-MICRO Tue 29 MAY 90 10:31am WELL DATA FILE: C:\WDSDATA\W04313.WDF ECC: 4313.00 COMPANY NAME: WELL NAME: FIELD: LOCATION: BP EXPLORATION (ALASKA) S - 24 Top of Well: Bottom of Well: Level Spacing: 9730.000 10460.000 0.500 NUMBER OF CURVES: 16 DEPTH AC CHT CILD CLSN GR RFOC RILD RILM SP CN SPD CNC TEMP CSSN ~. ~ TTEN ~. COMPANY:BP EXPLORATION (ALASKA) WELL:S - 24 FIELD:PRUDHOE BAY COUNTY:NORTH SLOPE STATE:ALASKA TAPE INFORMATION FILE:MAIN .001 FILE INTERVAL: START= 10460.000 END= 9730.000 DEPT GR TTEN CNC RFOC RILD RILM SPD SP CHT CILD AC LSN TEMP SSN CN 10460.000 -999.2~0 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 10435.000 0.000 3645.537 0.000 7.864 0.200 4.375 20.998 -80.000 324.024 0.000 50.000 35.000 100.000 100.000 0.000 10410.000 0.000 5225.352 0.000 24.170 173.576 5.761 85.323 6.665 19.998 -111.489 1148.933 35.000 100.000 100.000 0.000 10385.000 0.000 5221.246 0.000 5.501 1.725 1.964 19.998 -70.908 1130.004 579.646 86.739 35.000 100.000 100.000 0.000 10360.000 53 25.218 13.406 20.459 7.799 320.638 3.119 3.078 19.998 -75.209 1195.492 77.323 122.715 174.139 283.052 16.459 10335.000 53 25.397 57.277 23.423 6.882 469.920 2.128 2.265 19.998 -71.359 1205.304 85.428 105.522 174.451 269.006 19.423 10310.000 59.604 5186.859 24.330 7.232 350.365 2.854 3.277 20.998 -53.907 1126.682 80.499 103.399 174.860 271.243 20.330 10285.000 26.481 5065.836 26.412 5.552 483.541 2.068 86.331 2.215 20.9'98 -69.190 1083.382 91.574 175.185 255.734 22.412 10260.000 30.091 5036.996 28.738 6.496 620.058 1.613 92.089 1.818 20.998 -76.325 1061.003 78.880 175.183 235.064 24.738 10235.000 38 5036 24 .8O8 .910 .423 6.296 472.515 2.116 87.683 2. 285 20. 998 -76. 417 1061. 753 95. 561 175. 095 251. 414 20. 423 10210.000 26 4966 22 .868 .305 .174 7.567 379.067 2.638 3.038 20.998 -70.538 1028.913 79.900 113.555 175.000 277.881 18.174 10185.000 24 5055 26 .417 .805 .585 6.553 581.698 1.719 87. 140 1.851 20.998 -76.099 1052.732 89.569 174.905 251.390 22.585 10160.000 24 4942 27 .969 .727 .861 9.634 232.682 4.298 97.941 4.501 20.998 -58.464 1033.378 79.200 174.787 230.444 23.861 10135.000 37 4991 28 .230 .262 .930 8.680 193.073 5. 179 89.508 5.110 20.998 -60.802 1058.853 80.399 174.578 240.827 24.930 10110.000 28 4934 23 .767 .941 .109 13.010 148.511 6.733 6.533 20.998 -66.453 1046.595 87.861 102.104 174.413 257.666 19.109 10085.000 24.979 4976.543 25.162 15.049 129.852 7.701 87.975 7.286 20.998 -63.027 1056.755 97.905 174.235 263.472 21.162 10060.000 24.804 5090.512 17.253 87.588 11.417 87. 187 10.483 20.998 -72.041 1112.726 92.099 173.963 251.508 21.651 ~5. 651 10035.000 36.818 12.856 10.818 5052.871 92.441 94.078 26.985 10.207 83.615 20.998 173.657 -55.643 237.387 1129.347 22.985 10010.000 55.946 26.071 14.314 5214.449 69.861 79.761 21.139 14.041 111.093 20.998 173.305 -44.501 262.433 1209.452 17.139 9985.000 90.096 43.608 33.589 5374.074 29.772 66.839 14.841 37.684 185.041 20.998 172.827 -13.309 340.962 1294.426 10.841 9960.000 111.155 317.531 91.119 5212.344 10.975 55.796 10.649 115.415 282.836 20.889 172.029 -13.464 420.442 1236.589 6.649 9935.000 84.039 32.632 20.891 5147.891 47.867 66.026 16.281 22.093 180.705 20.998 171.281 14.913 354.606 1214.688 12.281 9910.000 110.600 9.634 11.101 5125.551 90.080 82.605 28.462 10.767 74.544 20.998 170.635 -43.930 220.498 1184.122 24.462 9885.000 140.680 12.399 15.982 5087.910 62.571 68.606 11.427 18.896 253.678 20.998 170.042 -62.272 394.182 1182.254 7.427 9860.000 53.314 17.551 13.505 5080.961 74.046 84.293 25.287 13.314 93.057 20.998 169.472 -78.083 251.369 1192.750 21.287 S - 24 DEPT GR RFOC RILD TTEN CILD AC CNC RILM LSN SPD TEMP SP SSN CHT CN 9835.000 96.746 0.391 9.168 5082.074 109.076 64.182 28.248 10000.000 52.786 20.998 168.798 -230.501 155.231 1198.542 24.248 9810.000 80.552 0.200 0.200 3500.000 0.000 61.440 54.419 0.200 30.322 0.000 167.931 -80.000 140.466 500.000 50.419 9785.000 75.062 0.200 0.200 3500.000 0.000 50.000 52.896 0.200 29.308 0.000 166.920 -80.000 133.668 500.000 48.896 9760.000 73.534 0.200 0.200 3500.000 0.000 50.000 0.000 0.200 35.000 0.000 166.050 -80.000 100.000 500.000 0.000 9735.000 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 9730.000 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 WELL DATA FILE: C:\WDSDATA\W04314.WDF ECC COMPANY NAME: WELL NAME: FIELD: LOCATION: Top of Well: Bottom of Well: Level Spacing: 4314.00 BP EXPLORATION S - 24 9740.000 10460.000 0.250 (ALASKA) NUMBER OF CURVES: 16 DEPTH AC CHT GR RFOC RILD CILD CLSN CN CNC CSSN RILM SP SPD TEMP TTEN FILE:REPEAT.002 FILE INTERVAL: START= 10460.000 END= 9740.000 DEPT 10460.000 10447.500 10435.000 10422.500 10410.000 10397.500 10385.000 10372.500 10360.000 GR TTEN CNC -999.250 -999.250 -999.250 0.000 3500.000 0.000 0.000 3691.525 0.000 0.000 5199.387 0.000 0.000 5191.957 0.000 0.000 5263.324 0.000 0.000 5245.691 22.215 22.551 5447.488 21.564 24.636 5388.758 21.521 RFOC CILD -999.250 -999.250 0.200 0.000 7.821 0.000 6.109 277.143 21.579 175.416 7.425 375.467 5.502 588.239 5.434 477.272 7.510 311.166 RILD AC -999.250 -999.250 0.200 50.000 0.200 50.000 3.608 50.000 5.701 85.251 2.663 85.301 1.700 87.924 2.095 87.739 3.214 77.002 RILM LSN -999.250 -999.250 0.200 35.000 4.404 35.000 4.406 35.000 6.48'0 35.000 2.911 35.000 1.938 113.718 2.201 114.893 3. 190 120.703 SPD TEMP -999.250 -999.250 0.000 100.000 19.998 100.000 19.234 100.000 18.998 100.000 19.234 100.000 18.998 100.000 19.234 100.000 19.992 174.103 SP SSN -999.250 -999.250 -80.000 100.000 -66.921 100.000 -66.788 100.000 -113.423 100.000 -72.260 100.000 -77.253 278.663 -75.613 275.413 -81.122 288.914 CHT CN -999.250 -999.250 500.000 0.000 360.446 0.000 1148.927 0.000 1168.270 0.000 1159.165 0.000 1154.110 18.215 1244.071 17.564 1222.928 17.521 10347.500 10335.000 10322.500 10310.000 10297.500 10285.000 10272.500 10260.000 10247.500 10235.000 10222.500 10210.000 10197.500 10185.000 10172.500 10160.000 62.774 5314.539 26.521 22.597 5468.340 22.520 86.947 5318.262 35.326 68.318 5152.941 23.744 19.942 5135.176 25.070 21.464 5079.270 25.939 20.918 5163.473 26.993 28.169 5191.156 30.656 46.331 5044.562 24.566 35.354 5142.266 27.539 19.648 5073.344 21.886 25.887 5062.457 24.126 83.102 4981.191 24.467 24.766 5073.441 24.731 27.852 5048.145 24.123 25.385 4987.098 27.881 5.243 404.703 6.571 446.596 6. 138 169.590 7. 182 351.327 7.417 422. 183 5.487 428.674 6.248 609.867 5.620 629.016 6.497 484.834 6.417 471.931 7.350 396.104 7.855 387.603 3.675 342.383 6.534 571.862 8.249 343.711 8.499 231.595 2.471 80.287 2.239 84.861 5.897 73.301 2.846 79.732 2.369 83.356 2.333 88.801 1.640 89.228 1.590 90.813 2.063 87.251 2.119 87.848 2.525 82.886 2.580 79.723 2.921 80.149 1.749 85.737 2.909 93.090 4.318 99.279 2.735 83.157 2.298 111.489 5.979 53.963 3.115 111.039 2.488 99.132 2.166 94.058 1.825 87.082 1.813 76.503 2.325 99.541 2.288 87.064 2.710 114.271 2.977 110.340 3.390 83.518 1.897 95.992 3.115 97.134 4.526 82.351 19.653 174.476 19.592 175.038 19.998 175.681 19.998 176.156 19.998 176.626 19.998 177.058 19.998 177.341 19.998 177.578 19.998 177.654 19.998 177.743 19.998 177.786 19.998 177.825 19.998 177.858 19.998 177.796 19.998 177.721 19.998 177.587 -40.950 232.958 -78.141 275.983 23.288 188.343 -65.420 285.979 -74.988 266.031 -72.233 259.061 -78.627 247.284 -78.212 239.643 -75.563 263.039 -76.025 251.065 -74.015 276.943 -68.803 287.623 -29.282 220.029 -72.172 254.951 -68.338 253.175 -58.592 239.745 1193.247 22.521 1255.609 18.520 1199.552 31.326 1143.860 19.744 1123.547 21.070 1148.354 21.939 1138.404 22.993 1174.694 26.656 1077.706 20.566 1146.167 23.539 1091.282 17.886 1081.381 20. 126 1053.715 20.467 1093.276 20.731 1086.665 20.123 1061.596 23.881 S - 24 DEPT 10147.500 10135.000 10122.500 10110.000 10097.500 10085.000 10072.500 10060.000 10047.500 10035.000 10022.500 10010.000 9997.500 9985.000 9972.500 GR TTEN CNC 50.136 5238.184 24.701 36.589 4979.902 28.146 33.071 4995.758 26.183 30.516 4960.738 26.180 50.308 4999.859 24.807 26.079 5040.641 25.600 30.022 5417.648 23.691 23.376 5021.840 27.394 41.928 5100.934 25.822 36.439 5078.457 23.738 25.111 5189.609 24.687 62.016 5238.266 21.783 318.171 5250.516 19.944 85.097 5294.672 14.387 107.197 5256.297 10.694 RFOC CILD 13.673 192.159 8.567 194.759 12.499 146.494 12.620 147.430 11.160 124.578 14.687 129.554 12.510 106.528 15.829 88.733 10.519 74.702 11.949 93.624 17.195 78.493 20.898 69.416 11.935 118.745 48.473 28.269 229.837 10.284 RILD AC 5.204 83.079 5. 135 89.842 6.826 86.998 6.783 87.654 8.027 82.793 7.719 87.402 9.387 88.357 11.270 89.472 13.386 81.317 10.681 93.976 12.740 88.248 14.406 79.243 8.421 78.784 35.375 67.059 97.242 58.025 RILM LSN 5.102 91.894 5.058 83.266 6.577 86.604 6.533 95.273 7.608 93.036 7.325 97.881 8.532 106.194 10.202 87.584 11.910 96.733 10.010 93.244 10.906 98.653 14.405 108.476 9.917 134.699 36.269 191.546 118.851 302.612 SPD TEMP 19.998 177.481 19.998 177.311 19.998 177.208 19.998 177.079 19.998 176.972 19.998 176.810 19.998 176.745 19.998 176.575 19.998 176.421 19.998 176.336 19.998 176.181 19.998 176.005 19.998 175.825 19.998 175.601 19.998 175.281 SP SSN -33.905 243.844 -60.316 244.185 -63.077 240.244 -67.696 264.268 -49.741 247.676 -64.887 266.893 -66.334 273.039 -74.860 251.542 -38.229 265.507 -52.770 240.102 -65.438 261.666 -38.181 261.983 -60.834 304.998 -8.257 345.678 -15.764 451.014 CHT CN 1163.715 20.701 1082.488 24. 146 1076.603 22.183 1062.300 22.180 1077.218 20.807 1083.837 21.600 1269.357 19.691 1088.938 23.394 1122.151 21.822 1130.836 19.738 1169.875 20.687 1207.707 17.783 1254.006 15.944 1271.916 10.387 1247.380 6.694 9960.000 9947.500 9935.000 9922.500 9910.000 9897.500 9885.000 9872.500 9860.000 9847.500 S - 24 DEPT 9835.000 9822.500 9810.000 9797.500 9785.000 105.538 5263.633 10.944 116.817 5234.781 37.207 86.054 5171.832 18.347 139.932 5081.180 25.841 110.745 5122.211 27.572 60.826 5156.539 12.054 212.668 5100.301 14.021 66.412 5107.988 22.084 57.290 5090.715 26.424 63.534 5085.324 31.909 GR TTEN CNC 98.643 5106.520 30.031 77. 171 5086.656 54. 618 82.920 3500.000 57.849 79.403 3500.000 56.649 79.134 3500.000 64.378 319.405 10.845 45.270 37.376 27.650 48.603 49.232 31.525 9.672 91.244 33.105 27.625 10.864 62.755 9.874 106.174 17.967 72.372 13.079 58.323 RFOC CILD 0.385 99.451 0.392 90.581 0.200 0.000 0.200 0.000 0.200 0.000 92.206 55.628 26.755 67.034 20.575 65.710 31.721 85.156 10.960 81.652 36.200 63.849 15.935 70.957 9.419 81.807 13.817 84.297 17.146 83.204 RILD AC 10.055 48.964 11.040 66.295 0.200 63.011 0.200 61.901 0.200 50.000 114.691 285.780 34.777 58.401 21.676 170.997 32.855 88.716 10.325 79.859 37.803 249.647 17.970 200.099 8.979 110.025 13.531 90.750 11.237 46.641 RILM LSN 10000.000 51.285 10000.000 29.220 0.200 29.261 0.200 28.423 0.200 27.413 19.998 174.911 19.998 174.558 19.998 174.177 19.998 173.773 19.998 173.447 19.998 173.121 19.998 172.778 19.998 172.488 19.998 172.215 19.998 171.916 SPD TEMP 19.998 171.561 19.998 171.110 0.000 170.644 0.000 170.187 0.000 169.647 -8.260 432.125 4. 917 211.831 19.648 364.722 16.873 243.640 -34.185 230.502 -30.333 401.333 -60.228 354.977 -74.408 268.432 -76.887 253.514 -56.243 150.675 SP SSN -226.103 158.115 -225.501 135.632 -216.972 139.996 -80.000 134.517 -80.000 138.172 1256.810 6.944 1234.791 33.207 1219.536 14.347 1165.493 21.841 1184.180 23.572 1192.330 8.054 1186.439 10.021 1191.548 18.084 1194.512 22.424 1191.281 27.909 CHT CN 1205.247 26.031 1197.199 50.618 500.000 53.849 500.000 52.649 500.000 60.378 9772.500 72.640 3500.000 63.116 9760.000 73.95 3500.00 0.00 9747.500 0.00 3500.00 0.00 9740.000 -999.250 -999.250 -999.250 WELL DATA FILE: C ECC: COMPANY NAME: WELL NAME: FIELD: LOCATION: Top of Well: Bottom of Well: Level Spacing: 0.200 0.200 0.200 0.000 -80.000 500.000 0.000 50.000 27.310 169.106 136.382 59.116 0.200 0.200 0.200 0.000 -80.000 500.000 0.000 50.000 35.000 168.595 100.000 0.000 0.200 0.200 0.200 0.000 -80.000 500.000 0.000 50.000 35.000 168.098 100.000 0.000 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 : \WDSDATA\W04316. WDF 4316.00 BP EXPLORATION (ALASKA) S - 24 10040.000 10450.000 0.500 NUMBER OF CURVES: 16 DEPTH AC CHT GR RFOC RILD CILD CLSN CN CNC CSSN RILM SP SPD TEMP TTEN FILE:REPEAT.003 FILE INTERVAL: START= 10450.000 END= 10040.000 DEPT 10450.000 10425.000 10400.000 10375.000 GR TTEN CNC -999.250 -999.250 -999.250 0.000 5035.219 0.000 0.000 5238.070 0.000 0.000 5423.652 22.308 RFOC RILD RILM SPD SP CHT CILD AC LSN TEMP SSN CN -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 7.706 0.200 4.412 20.998 -60.563 1067.407 0.000 50.000 35.000 100.000 100.000 0.000 5.940 2.468 2.554 20.998 -67.750 1137.795 405.117 85.143 35.000 100.000 100.000 0.000 4.753 1.965 2.162 22.962 -69.108 1266.555 508.926 89.031 112.767 100.000 277.192 18.308 10350.000 49.870 6.519 2.323 2.533 21.998 -58.128 1204.848 10325.000 10300.000 10275.000 5345.051 430.482 84.146 23.722 84.710 9.066 7.813 5406.145 127.992 67.470 25.063 21.116 7.163 2.005 5242.988 498.822 83.835 25.149 24.994 6.303 1.681 5145.852 594.874 88.704 27.928 102.739 7.912 114. 113 2.243 96.268 1.925 88.993 179.485 21.998 179.886 22.597 180.769 22.998 181.268 264.418 28.402 306.171 -69.351 258.966 -69.060 259.414 19.722 1231.474 21.063 1168.035 21.149 1124.194 23.928 10250.000 54.842 5.737 1.892 5110.695 528.583 88.878 27.064 2.052 89.472 22.998 181.443 -67.362 254.580 1109.763 23.064 10225.000 41.323 6.269 2.184 4932.879 457.802 87.923 26.514 2.312 92.483 22.998 181.505 -66.109 259.034 1035.191 22.514 10200.000 21.085 7.329 2.222 5207.754 449.949 84.200 25.106 2.303 97.266 22.998 181.423 -60.130 261.312 1143.208 21.106 10175.000 21.994 8.594 2.438 5114.652 410.211 89.403 27.292 2.761 92.244 22.998 181.205 -63.113 264. 171 1105.754 23.292 10150.000 78.754 15.333 5.262 5338.184 190.035 86.657 · 26.053 5.509 79.211 22.998 181.067 -12.940 218.902 1223.906 22.053 10125.000 24.781 13.711 8.147 5004.406 122.749 90.599 26.639 7.407 91.538 22.998 180.955 -60.759 257.317 1082.825 22.639 10100.000 27.242 0.200 0.200 3500.000 0.000 85.849 26.070 0.200 88.147 0.000 180.766 -8O.O00 243.714 500.000 22.070 10075.000 34.224 0.200 0.200 3500.000 0.000 50.000 24.822 0.200 96.403 0.000 180.595 -80.000 256.762 500.000 20.822 10050.000 0.000 0.200 0.200 3500.000 0.000 50.000 0.000 0.200 35.000 0.000 180.323 -80.000 100.000 500.000 0.000 10040.000 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 End of execution: Tue 29 MAY 90 10:31am Elapsed execution time = 22.41 seconds. SYSTEM RETURN CODE = 0