Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
HOME
EVENTS
DATA
Data List
Drilling
Production
Orders
Data Miner
Document Search
REPORTS
Reports and Charts
Pool Statistics
FORMS
LINKS
Links
Test Notification
Data Requests
Regulations
Industry Guidance Bulletins
How to Apply
ABOUT US
History
Staff
HELP
Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
191-051
Originated: Delivered to:8-Apr-22Halliburton Alaska Oil and Gas Conservation Comm.Wireline & Perforating Attn.: Natural Resource TechnicianAttn: Fanny Haroun 333 West 7th Avenue, Suite 1006900 Arctic Blvd. Anchorage, Alaska 99501Anchorage, Alaska 99518Office: 907-275-2605FRS_ANC@halliburton.comThe technical data listed below is being submitted herewith. Please address any problems orconcerns to the attention of the sender aboveWELL NAME API # SERVICE ORDER # FIELD NAME JOB TYPE DATA TYPE LOGGING DATE PRINTS #DIGITAL #1 1C-15 50-029-22932-00 907743115 Kuparuk River Multi Finger Caliper Field & Processed 16-Mar-22 0 12 1E-31 50-029-22791-00 907676477 Kuparuk River Packer Setting Record Field- Final 14-Feb-22 0 13 1L-29 50-029-22157-00 907706865 Kuparuk River Plug Setting Record Field- Final 25-Feb-22 0 14 1L-29 50-029-22157-00 n/a Kuparuk River Jet Cut Record Field- Final 14-Nov-21 0 15 2W-09 50-029-21235-00 907723402 Kuparuk River Multi Finger Caliper Field & Processed 1-Mar-22 0 16 2W-09 50-029-21235-00 n/a Kuparuk River Multi Finger Caliper Field & Processed 24-Jan-22 0 17 3B-02 50-029-21319-00 907705186 Kuparuk River Injection Profile Field- Final 23-Feb-22 0 18 3M-05 50-029-21706-00 n/a Kuparuk River Multi Finger Caliper Field & Processed 23-Jan-22 0 19 3Q-04 50-029-22219-00 n/a Kuparuk River Plug Setting Record Field- Final 20-Feb-22 0 110PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING A COPY OF THE TRANSMITTAL LETTER TO THE ATTENTION OF:Fanny Haroun, Halliburton Wireline & Perforating, 6900 Arctic Blvd., Anchorage, AK 99518FRS_ANC@halliburton.comDate:Signed:Transmittal Date:191-051T3645831L-2950-029-22157-0041L-2950-029-22157-00Meredith GuhlDigitally signed by Meredith Guhl Date: 2022.04.08 10:31:52 -08'00' C:\Users\mdguhl\AppData\Local\Microsoft\Windows\INetCache\Content.Outlook\LCF4WGUY\2022-03-06_22005_KRU_1L-29_CaliperSurvey_Transmittal.docx DELIVERABLE DISCRIPTION Ticket # Field Well # API # Log Description Log Date 22005 KRU 1L-29 50-029-22157-00 Caliper Survey 06-Mar-22 DELIVERED TO Company & Address DIGITAL FILE # of Copies LOG PRINTS # of Prints CD’s # of Copies 1 AOGCC Attn: Natural Resources Technician 333 W. 7th Ave., Suite 100 Anchorage, Ak. 99501-3539 Delivered By: CPAI Sharefile FTP ______________________________ ______________________________________ Date received Signature PLEASE RETURN COPY VIA EMAIL TO: DIANE.WILLIAMS@READCASEDHOLE.COM READ CASED HOLE, INC., 4141 B STREET, SUITE 308, ANCHORAGE, AK 99503 PHONE: (907)245-8951 E-MAIL : READ-Anchorage@readcasedhole.com WEBSITE : WWW.READCASEDHOLE.COM 191-051 T36404 Meredith Guhl Digitally signed by Meredith Guhl Date: 2022.03.07 15:26:11 -09'00' CAUTION: This email originated from outside the State of Alaska mail system. Do not click links or open attachments unless you recognize the sender and know the content is safe. From:Phillips, Ron L To:Loepp, Victoria T (OGC) Subject:CPAI: No BPV for N7ES MIRU/RDMO 1L-29 Procedural Change (PTD 191-051/Sundry 321-533) Date:Wednesday, December 15, 2021 12:40:16 PM Attachments:1L-29 10-403 RWO Approved.pdf Victoria, Per our recent discussions with you and our internal risk assessment done on N7ES for MIRU/RDMO operations, we plan to NOT install a BPV for the MIRU/RDMO operations on KRU 1L-29. Please let me know that you approved, since the sundry was approved before this change. This is our next well on the schedule and we plan to move there the middle of next week. Thanks, Ron Phillips Senior RWO Engineer ConocoPhillips Alaska 907-317-5092 ATO-06-656 ! " # " $$$$$$$$$$$$$$$$$$$$$$ % &' ( )*! + (% ,- !. /"!! 0- ,- 12132+.2 4, . " ( % 13516 ! )5176 153+6 & % 13516 )5176 8 9 , :;; . 5#41<'7#41< -#/2 7/068% 3/+569% = 9, (; . /00268% 72068% 7+568% !4 7/))69% 3/5/69% 3/))69% !4 1 >: ( * , . !4 5 > 3" = % ( " &' ( % - ( )" = ? "%- & % ? ?*!@ A -A? (!!4 &' ! & : ,02+.1)3#)51" & /)+#026;1+7#115;1512#15526 )25)#)2336;))0#)/)6;)151#)15)6 B & ? & :! % % "*!@"? B " #C #C +*( ( (= B B D % ( *E % BBB #*B 7 ,> 12132+2;132+;F131/5. B ? #8 &-G -G*-!%?!& 9*!88**! 3 % !1 ! ! 7" C"= !" #$%! #%&' !" #$%! #& ((& =;* C'225)2 ;G0032 5 !4 %)*+, +/6 )2216 #-% * )< 0#34/< - +106 23/6 . /#)* 0 116 )2736 3< +)/6 13116 )506 +< @= = =C=H- = =C=HC = =*"#)- = 9! 1!/+ .(&& /% 116 5)0/6 30076 2#727 24121 " 52( By Meredith Guhl at 2:45 pm, Feb 24, 2022 Ron Phillips Digitally signed by Ron Phillips Date: 2022.02.24 11:01:43 -09'00' DSR-2/24/22 RBDMS SJC 022522 Page 1/11 1L-29 Report Printed: 1/31/2022 Operations Summary (with Timelog Depths) Job: RECOMPLETION Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 1/12/2022 00:00 1/13/2022 00:00 24.00 MIRU, MOVE MOB P Rig down. Pull pits away from sub. Pull sub off of well. Load office, shop and pit. L/D derrick. Transport T/ 1L. Stage pits on location. Set office and shop. Clean up around well and pad. 0.0 0.0 1/13/2022 00:00 1/13/2022 05:00 5.00 MIRU, MOVE MOB T Pull sub off of pad. Identified low air pressure on new tire. Pulled back on 3M. Wait on NES tire truck to address the low tire pressure. 0.0 0.0 1/13/2022 05:00 1/14/2022 00:00 19.00 MIRU, MOVE MOB P Rig move from 3M-Pad to 1L-Pad 0.0 0.0 1/14/2022 00:00 1/14/2022 03:00 3.00 MIRU, MOVE MOB P Spot pits. 0.0 0.0 1/14/2022 03:00 1/14/2022 06:00 3.00 MIRU, MOVE RURD P M/U junk pipe storage area. R/U up Tiger Tank and hard line. Move mud shack and smoke shack into position. Spot cuttings tank. 0.0 0.0 1/14/2022 06:00 1/14/2022 09:30 3.50 MIRU, MOVE RURD P PJSM. Review Derrick Checklist. Raise Derrick and Pin same 0.0 0.0 1/14/2022 09:30 1/14/2022 14:30 5.00 MIRU, MOVE RURD P PJSM. RU Cattle Chute and Bridle down blocks. 0.0 0.0 1/14/2022 14:30 1/14/2022 16:00 1.50 MIRU, MOVE RURD P Load pits with 580 BBL's 10.0# NaCl brine. Verify PRV's on mud pump function correctly. Rig up hard line to wellhead in cellar. Blow air to return tanks verify open flow path to tanks. Verify PVT system manually. Rig accepted @ 15:00 0.0 0.0 1/14/2022 16:00 1/14/2022 16:30 0.50 MIRU, MOVE SFTY P PJSM for well kill. Discussed hazards and mitigations, pressure, line of fire, pinch points, congested location, SSE. 0.0 0.0 1/14/2022 16:30 1/14/2022 17:30 1.00 MIRU, MOVE RURD P R/U bleed trailer T/ OA. B/D secondary kill and tiger tank line. Record initial pressures: Tubing=1200 PSI. IA=1200 PSI. 0.0 0.0 1/14/2022 17:30 1/14/2022 22:30 5.00 MIRU, WELCTL KLWL P Bullhead 430 BBL's 10.0 ppg KWF down IA @ 5 BPM 1150 PSI. After pumping IA= 600 PSI. Bullhead 177 BBL's down TBG @ 5BM, 1100 PSI. PSI After pumping IA=325 PSI. Attempt T/ bleed pressure off in cellar went straight gas and did not bleed down. 0.0 0.0 1/14/2022 22:30 1/15/2022 00:00 1.50 MIRU, WELCTL KLWL P Bullhead 315 BBL's 10.0 ppg KWF down IA @ 5 BPM 1200 PSI. After pumping IA=150 PSI. Bleed pressure off came back T/ 150 PSI. 0.0 0.0 1/15/2022 00:00 1/15/2022 02:00 2.00 MIRU, WELCTL KLWL P Bullhead 123 BBL's down TBG @ 5BM, 980 PSI. PSI After pumping 325 PSI. Bleed pressure off came back T/ 325 PSI. 0.0 0.0 1/15/2022 02:00 1/15/2022 04:00 2.00 MIRU, WELCTL KLWL P Bullhead 315 BBL's 10.0 ppg KWF down IA @ 6 BPM 1300 PSI. After pumping IA=150 PSI. Bleed pressure off. Stabilized @ 100 PSI. 0.0 0.0 1/15/2022 04:00 1/15/2022 07:00 3.00 MIRU, WELCTL COND T Offload 290 Bbls of 10.7 NaBr/NaCl add water to make new KWF of 10.4 PPG NaBr/NaCl. Waiting on E-Line Unit 0.0 0.0 1/15/2022 07:00 1/15/2022 07:30 0.50 MIRU, WELCTL SFTY P Slickline Unit On Location. PJSM W/Both crews. Review game plan. 0.0 0.0 1/15/2022 07:30 1/15/2022 13:00 5.50 MIRU, WELCTL RURD T MIRU Slickline. Unload equipment from unit to pipe shed to rig floor. 0.0 0.0 1/15/2022 13:00 1/15/2022 13:15 0.25 MIRU, WELCTL PRTS T Check valve alignment, PT Slickline lubricator to 2500 psi with Rig pump. 0.0 0.0 Rig: NABORS 7ES RIG RELEASE DATE Page 2/11 1L-29 Report Printed: 1/31/2022 Operations Summary (with Timelog Depths) Job: RECOMPLETION Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 1/15/2022 13:15 1/15/2022 15:30 2.25 MIRU, WELCTL SLKL T Bleed DN to 500 psi, open well and RIH with Slickline 3.34" OD Drift. Drifted DN to 1953 ft with no issue. POOH and RD Slickline drift. RU and RIH w/3.36" OD Open Hole Sleeve to set across SSSV. 0.0 0.0 1/15/2022 15:30 1/15/2022 15:45 0.25 MIRU, WELCTL SFTY T POOH W/Slickline. PJSM for Rigging DN Tools, Lubricator from rig floor to pipe shed. Open Hole Sleeve Set. 0.0 0.0 1/15/2022 15:45 1/15/2022 18:00 2.25 MIRU, WELCTL RURD T RDMO Slickline Unit. 0.0 0.0 1/15/2022 18:00 1/15/2022 18:30 0.50 MIRU, WELCTL SFTY P PJSM w/ rig crew on bullhead kill. B/D OA bleed hose. Initial pressures Tubign=500 PSI IA=300 0.0 0.0 1/15/2022 18:30 1/15/2022 20:00 1.50 MIRU, WELCTL KLWL P Bullhead kill, pump 200 Bbls down IA @ 6 BPM, 650 PSI. Pump 250 Bbls down IA & tubing @ 10 BPM, 1400 PSI. Pump 25 down tubing @ 6 BPM, 600 PSI. Pump 87 Bbls down IA @ 7 BPM, 1000 PSI. Pump off PSI relaxed to 0 PSI on Tubing and IA. 0.0 0.0 1/15/2022 20:00 1/15/2022 21:30 1.50 MIRU, WELCTL OWFF P OWFF, 0 PSI on gauges. Slight hiss of gas, no fluid on Tubing & IA, open for 60 min T/ tiger tank. No flow. 0.0 0.0 1/15/2022 21:30 1/15/2022 22:00 0.50 MIRU, WELCTL MPSP P Set HP BPV. 0.0 0.0 1/15/2022 22:00 1/15/2022 22:30 0.50 MIRU, WELCTL PRTS P Rolling test on BPV. 17 Bbls T/ catch fluid on IA. Test BPV @ 5 BPM, for 10 min. PSI came up T/ 400 PSI - Good test. 0.0 0.0 1/15/2022 22:30 1/15/2022 23:30 1.00 MIRU, WHDBOP RURD P B/D, R/D circulating equipment in cellar. Line up secondary kill on IA t/ feed well. 0.0 0.0 1/15/2022 23:30 1/16/2022 00:00 0.50 MIRU, WHDBOP NUND P Nippling down tree. 0.0 0.0 1/16/2022 00:00 1/16/2022 04:30 4.50 MIRU, WHDBOP NUND P N/D tree. Inspect tubing hanger threads, heavy corrosion and scaling on threads, estimate 25-30% integrity loss. Cap SSSV port. Install tree test plug. Install plastic pack on hanger body. Filling IA every 30 min w/ ~15 Bbls of 10.4 PPG KWF to keep hole full. 0.0 0.0 1/16/2022 04:30 1/16/2022 10:00 5.50 MIRU, WHDBOP NUND P N/U DSA, and BOP. Record RKB measurements. Install flow nipple. Filling IA every 30 min w/ ~15 Bbls of 10.4 PPG KWF to keep hole full. 0.0 0.0 Rig: NABORS 7ES RIG RELEASE DATE Page 3/11 1L-29 Report Printed: 1/31/2022 Operations Summary (with Timelog Depths) Job: RECOMPLETION Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 1/16/2022 10:00 1/16/2022 23:30 13.50 MIRU, WHDBOP BOPE P Begin initial BOPE test, Tested BOPE at 250/3000 PSI for 5 Min each, Tested annular, UVBR's, w/ 3 1/2" & 4" test joints. Choke valves #1 to #11, & #16, Test 3 1/2" HT-38 FOSV and IBOP. Test 2" rig floor Demco kill valves. Test manual and HCR kill valves. Test two ea 2 1/6" gate auxiliary valves below LPR. Test hydraulic choke valve to 1500 PSI and demonstrate bleed off. Perform accumulator test. Initial pressure=3050 PSI, after closure=1600 PSI, 200 PSI attained =18 sec, full recovery attained =143 sec. UVBR's= 5 sec, LVBR's= 5 sec. Annular= 30 sec. Simulated blinds= 6 sec. HCR choke & kill= 1 sec each. 5 back up nitrogen bottles average =2050 PSI. Test gas detectors, PVT and flow show. Witness waived by AOGCC rep Brian Bixby. Filling IA every 30 min w/ ~15 Bbls of 10.4 PPG KWF to keep hole full. 0.0 0.0 1/16/2022 23:30 1/17/2022 00:00 0.50 MIRU, WHDBOP BOPE T Fail/Pass on manual bean choke and CMV# 12 & 13. Replaced grease fitting on been choke. Greased and fuctioned CMV# 12 & 13. Passed retest. Filling IA every 30 min w/ ~15 Bbls of 10.4 PPG KWF to keep hole full. 0.0 0.0 1/17/2022 00:00 1/17/2022 01:00 1.00 MIRU, WHDBOP BOPE P Complete initial BOPE test, Tested BOPE at 250/3000 PSI for 5 Min each, LVBR's w/ 3 1/2" & 4" test joints. Test blinds rams. Choke valves #12 to #15, upper and lower top drive well control valves. Test Manual and HCR choke valves. Test manual choke valve to 1500 PSI and demonstrate bleed off. Witness waived by AOGCC rep Brian Bixby. Filling IA every 30 min w/ ~15 Bbls of 10.4 PPG KWF to keep hole full. 0.0 0.0 1/17/2022 01:00 1/17/2022 01:30 0.50 MIRU, WHDBOP PRTS T Test rental 3 1/2" EUE FOSV at CPAI request. Valve failed. Valve will be shipped off location and a replacement valve will be sent out by vendor. Filling IA every 30 min w/ ~15 Bbls of 10.4 PPG KWF to keep hole full. 0.0 0.0 1/17/2022 01:30 1/17/2022 02:00 0.50 MIRU, WHDBOP CIRC P Circulate fresh water out of BOP and choke manifold with 10.4 PPG KWF. Filling IA every 30 min w/ ~15 Bbls of 10.4 PPG KWF to keep hole full. 0.0 0.0 1/17/2022 02:00 1/17/2022 03:00 1.00 MIRU, WHDBOP RURD P B/D choke kill and top drive. R/D test joints and testing equipment. Filling IA every 30 min w/ ~15 Bbls of 10.4 PPG KWF to keep hole full. 0.0 0.0 1/17/2022 03:00 1/17/2022 03:30 0.50 MIRU, WHDBOP RURD P R/U circulating manifold in cellar to secondary kill, secondary choke and IA. Filling IA every 30 min w/ ~15 Bbls of 10.4 PPG KWF to keep hole full. 0.0 0.0 Rig: NABORS 7ES RIG RELEASE DATE Page 4/11 1L-29 Report Printed: 1/31/2022 Operations Summary (with Timelog Depths) Job: RECOMPLETION Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 1/17/2022 03:30 1/17/2022 04:00 0.50 MIRU, WHDBOP MPSP P Run tree test plug in depressing pop it on BPV. Gas boiling in stack. Let gas vent for 5 Min - No decrease. Pull tree test plug. BPV still holding. 0.0 0.0 1/17/2022 04:00 1/17/2022 05:00 1.00 MIRU, WHDBOP CIRC P Circulate 168 Bbls of KWF down tubing, with open IA @ 5 BPM, 460 PSI. 0.0 0.0 1/17/2022 05:00 1/17/2022 05:30 0.50 MIRU, WHDBOP MPSP P Run dry rod in depress pop it - no flow. Pull HP BPV. 0.0 0.0 1/17/2022 05:30 1/17/2022 06:00 0.50 MIRU, WHDBOP CIRC P Fill hole with mud pump @ 6 BPM. 202 BPH loss rate. Shut in well in preparation of cutting KWF F/ 10.4 PPG T/ 10.0 PPG 0.0 0.0 1/17/2022 06:00 1/17/2022 11:00 5.00 COMPZN, RPCOMP COND P Condition Pit System F/10.4 PPG T/10.0 PPG 0.0 0.0 1/17/2022 11:00 1/17/2022 12:30 1.50 COMPZN, RPCOMP CIRC P Circulate and Condition well bore to a 10.0 PPG KWF. 126 GPM, 170 PSI, 720 bbls total pumped 0.0 0.0 1/17/2022 12:30 1/17/2022 13:30 1.00 COMPZN, RPCOMP RURD P R/U spooling unit, power tongs. M/U 4" Baker Spear T/ DP. 0.0 0.0 1/17/2022 13:30 1/17/2022 14:00 0.50 COMPZN, RPCOMP BHAH P MU 4" Baker Spear and engage Hanger. BOLDS. 0.0 0.0 1/17/2022 14:00 1/17/2022 15:30 1.50 COMPZN, RPCOMP PULL P Pulled 85K before hanger unseated. PUW=55K. Disconnect Control Line from Hanger, break out hanger and L/D same. C/O Handling equipment to 4" 11# TBG. 2,813.0 2,783.0 1/17/2022 15:30 1/17/2022 18:00 2.50 COMPZN, RPCOMP PULL P L/D 4" completion F/ 2782' T/ 1742'. PUW=55K. 48 BPH loss rate. 2,782.0 1,742.0 1/17/2022 18:00 1/17/2022 22:00 4.00 COMPZN, RPCOMP PULL P Attempt T/ RIH w/ 4" completion after terminating control line. Identified control line would not move down hole with pipe. Worked string F/ 1742' T/ 1702' and back down while pulling control line up with tugger. Recover 193' of additional control line out of the hole. Control line now moving down hole with string. 1,742.0 1,742.0 1/17/2022 22:00 1/17/2022 22:30 0.50 COMPZN, RPCOMP SVRG P Driller identified link tilt cylinder clamp had twisted. Perform TD inspection. Adjusted cylinder clamp and found blower hose plumbing missing a bolt. Replaced bolt and installed cable safety wire on bolts. 1,742.0 1,742.0 1/17/2022 22:30 1/17/2022 23:00 0.50 COMPZN, RPCOMP BHAH P M/U BHA #1, 6" smooth mill 9.97' long onto completion string 9.97' 1,742.0 1,753.0 1/17/2022 23:00 1/18/2022 00:00 1.00 COMPZN, RPCOMP PULD P Run BHA #1 in on DP T/ 104' with completion string hanging below it. Successful drift run. LDDP and BHA F/ 104' T surface. Control line was balled up around mill recover 30' piece of control line. Remaining control line is below rotary table. Loss rate has increased T/ 80 BPH. 1,753.0 1,742.0 1/18/2022 00:00 1/18/2022 01:00 1.00 COMPZN, RPCOMP BHAH P L/D BHA #1. 1,742.0 1,742.0 1/18/2022 01:00 1/18/2022 02:00 1.00 COMPZN, RPCOMP BHAH P M/U 7" casing storm packer BHA T/ 25' 1,742.0 1,757.0 1/18/2022 02:00 1/18/2022 02:30 0.50 COMPZN, RPCOMP PACK P Run packer on DP T/ 75' COE. Set packer. Release from packer. POOH. 1,757.0 1,807.0 1/18/2022 02:30 1/18/2022 03:00 0.50 COMPZN, RPCOMP PRTS P Test packer T/ 1000 PSI - failed test. 1,807.0 1,807.0 Rig: NABORS 7ES RIG RELEASE DATE Page 5/11 1L-29 Report Printed: 1/31/2022 Operations Summary (with Timelog Depths) Job: RECOMPLETION Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 1/18/2022 03:00 1/18/2022 03:30 0.50 COMPZN, RPCOMP PULD P M/U packer retrieveal tool and P/U 2 singles RIH. 1,807.0 1,807.0 1/18/2022 03:30 1/18/2022 04:00 0.50 COMPZN, RPCOMP PACK P Engage packer. Equalize pressure. Close annular. Release packer. OWFF - no flow. Open annular. 1,807.0 1,807.0 1/18/2022 04:00 1/18/2022 04:30 0.50 COMPZN, RPCOMP PULD P POOH w/ packer. Control line wrapped around packer. Recover 74' of Control line 1,807.0 1,742.0 1/18/2022 04:30 1/18/2022 06:00 1.50 COMPZN, RPCOMP PULL P Worked string F/ 1742' T/ 1702' and back down while pulling control line up with tugger. 1,742.0 1,742.0 1/18/2022 06:00 1/18/2022 06:30 0.50 COMPZN, RPCOMP SFTY P PTSM. Review plan forward for pulling control line while L/D 4" Tubing. 1,742.0 1,742.0 1/18/2022 06:30 1/18/2022 08:30 2.00 COMPZN, RPCOMP PULL P L/D Storm Packer and C/O Handling equipment. Continue laying down 4" TBG while pulling and cuting control line F/1,742 ft. 1,742.0 1,467.0 1/18/2022 08:30 1/18/2022 09:15 0.75 COMPZN, RPCOMP PULL P Found several 100' of feet of control line balled up aroung TBG. Continue to POOH L/D 4" TBG. 1,467.0 863.0 1/18/2022 09:15 1/18/2022 10:45 1.50 COMPZN, RPCOMP PULL P SSSV at surface with no control line attacked. 45 SS bands recoverd. Continue to Pull 4" TBG. Pulled 69 joints of 4" TBG and 1 GLM and 1 Cut section of 4" TBG @ 16.57 ft long. 863.0 0.0 1/18/2022 10:45 1/18/2022 12:45 2.00 COMPZN, RPCOMP PULD P C/O Handling equipment and Unload control line spooler from Rig floor. Load well with 30 bbls of 10.0 KWF. Unload 4" TBG from pipe shed. Load Drill Collars in pipe shed. Clean & Clear rig floor. 0.0 0.0 1/18/2022 12:45 1/18/2022 16:00 3.25 COMPZN, RPCOMP BHAH P PU & MU Drill collars. 0.0 0.0 1/18/2022 16:00 1/18/2022 16:30 0.50 COMPZN, RPCOMP MPSP P MU Baker 7" Storm Packer Assembly on Drill Collars and set Packer at center element at 100' COE on drill pipe. 0.0 100.0 1/18/2022 16:30 1/18/2022 17:00 0.50 COMPZN, RPCOMP TRIP P TOOH and standback one stand of drill pipe. 100.0 0.0 1/18/2022 17:00 1/18/2022 17:30 0.50 COMPZN, RPCOMP PRTS P PT Storm Packer to 1000 psi for 5 min. - Failed test. Would not hold hydrostatic column of fluid. 0.0 0.0 1/18/2022 17:30 1/18/2022 19:00 1.50 COMPZN, RPCOMP MPSP P M/U packer retrieval tool. RIH T/ 100'. Engage packer. Shut in annular, release packer, pump 10 Bbls KWF down tubing to verify no pressure under packer. Open annular. POOH. Inspect packer. Packer appeared to be in good condition. Believe the isolation sleeve was not pinned in the correct position. 0.0 0.0 1/18/2022 19:00 1/18/2022 19:30 0.50 COMPZN, RPCOMP MPSP P Run storm packer #1 for 2nd attempt. RIH T/ 57' COE. Set packer. 0.0 57.0 1/18/2022 19:30 1/18/2022 20:00 0.50 COMPZN, RPCOMP PRTS P PT Storm Packer to 1000 psi - Failed test. Would not hold hydrostatic column of fluid. 57.0 57.0 1/18/2022 20:00 1/18/2022 21:30 1.50 COMPZN, RPCOMP MPSP P M/U packer retrieval tool. RIH T/ 57'. Engage packer. Shut in annular, release packer, pump 10 Bbls KWF down tubing to verify no pressure under packer. Open annular. POOH. Inspect packer. Packer appeared to be in good condition. Decision made to switch to new 7" casing storm packer. 57.0 0.0 1/18/2022 21:30 1/18/2022 22:00 0.50 COMPZN, RPCOMP MPSP P M/U and run new storm packer #2. RIH T/ 72' COE. Set packer 0.0 72.0 Rig: NABORS 7ES RIG RELEASE DATE Page 6/11 1L-29 Report Printed: 1/31/2022 Operations Summary (with Timelog Depths) Job: RECOMPLETION Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 1/18/2022 22:00 1/18/2022 22:30 0.50 COMPZN, RPCOMP PRTS P PT Storm Packer to 1000 psi for 5 min. - Failed test. Would not hold hydrostatic column of fluid. 72.0 72.0 1/18/2022 22:30 1/19/2022 00:00 1.50 COMPZN, RPCOMP MPSP P M/U packer retrieval tool. RIH T/ 72'. Engage packer. Shut in annular, release packer, pump 10 Bbls KWF down tubing to verify no pressure under packer. Open annular. POOH. Inspect packer. Packer appeared to be in good condition. 72.0 0.0 1/19/2022 00:00 1/19/2022 01:00 1.00 COMPZN, RPCOMP MPSP P M/U and rerun storm packer #2 for second time. RIH T/ 72' COE. Set packer. 0.0 72.0 1/19/2022 01:00 1/19/2022 03:30 2.50 COMPZN, RPCOMP PRTS P PT Storm Packer to 1000 psi multiple times- Failed test. Checked void between packoff seals - no fluid. OA not showing any PSI increase. 72.0 72.0 1/19/2022 03:30 1/19/2022 05:00 1.50 COMPZN, RPCOMP MPSP P M/U packer retrieval tool. RIH T/ 72'. Engage packer. Shut in annular, release packer, pump 10 Bbls KWF down tubing & IA to verify no pressure under packer. Open annular. POOH. Inspect packer. Packer appeared to be in good condition. 72.0 0.0 1/19/2022 05:00 1/19/2022 06:00 1.00 COMPZN, RPCOMP TRIP P Stand back 2 stands of DC's. L/D 2 single DC's. 0.0 0.0 1/19/2022 06:00 1/19/2022 07:00 1.00 COMPZN, RPCOMP BHAH P PU Tandem 6" OD Mill Drift Assembly. 0.0 0.0 1/19/2022 07:00 1/19/2022 10:30 3.50 COMPZN, RPCOMP TRIP P TIH with 6" OD Drift on Drill pipe down to top of cut TBG at 2,809 ft. No Issues encountered 0.0 2,809.0 1/19/2022 10:30 1/19/2022 12:30 2.00 COMPZN, RPCOMP TRIP P TOOH with Drift standing back drill pipe. 2,809.0 0.0 1/19/2022 12:30 1/19/2022 13:00 0.50 COMPZN, RPCOMP CLEN P L/D BHA #2 6" Drift BHA. Clean & Clear Rig Floor. 0.0 0.0 1/19/2022 13:00 1/19/2022 14:30 1.50 COMPZN, RPCOMP BHAH P MU BHA #3 Model "G" RBP and Test Packer. 0.0 33.0 1/19/2022 14:30 1/19/2022 16:30 2.00 COMPZN, RPCOMP TRIP P TIH with plug and test packer. 33.0 2,798.0 1/19/2022 16:30 1/19/2022 17:15 0.75 COMPZN, RPCOMP PRTS P Set RBP at 2798 '. PUH to 2678' and set test packer and PT between Packers to 1000 psi. for 5 min. Good test 2,798.0 2,678.0 1/19/2022 17:15 1/19/2022 17:30 0.25 COMPZN, RPCOMP TRIP P POOH F 2678' T/ 2374'. Set test packer 2374' COE. 2,678.0 2,374.0 1/19/2022 17:30 1/19/2022 21:00 3.50 COMPZN, RPCOMP PRTS P PT in between packers F/ 2798' T 2374' T/ 1000 PSI for 10 Min - Good test. PT IA F/ 2374' T/ surface for 10 Min - Good test. Consult with town. Decision made T/ perform 30 Min tests. PT in between packers F/ 2798' T 2374' T/ 1000 PSI for 30 Min - Good test. PT IA F/ 2374' T/ surface for 30 Min - Good test. 2,374.0 2,374.0 1/19/2022 21:00 1/19/2022 21:30 0.50 COMPZN, RPCOMP RURD P B/D & R/D test equipment on rig floor and IA. 2,374.0 2,374.0 1/19/2022 21:30 1/19/2022 21:45 0.25 COMPZN, RPCOMP PACK P M/U TD. P/U on string open equalization port on test packer. Release test packer. P/U 10', S/O 10' to verify released. 2,374.0 2,374.0 1/19/2022 21:45 1/19/2022 22:30 0.75 COMPZN, RPCOMP CIRC P Circ STS+. Pump total of 90 Bbls @ 4.5 BPM, 350 PSI. Overboard contaminated fluid T/ cuttings tank. 2,374.0 2,374.0 1/19/2022 22:30 1/20/2022 00:00 1.50 COMPZN, RPCOMP TRIP P POOH F/ 2374' T/ 22'. PUW=65K, SOW=65K 2,374.0 22.0 Rig: NABORS 7ES RIG RELEASE DATE Page 7/11 1L-29 Report Printed: 1/31/2022 Operations Summary (with Timelog Depths) Job: RECOMPLETION Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 1/20/2022 00:00 1/20/2022 00:30 0.50 COMPZN, RPCOMP BHAH P L/D BHA #3 22.0 0.0 1/20/2022 00:30 1/20/2022 01:00 0.50 COMPZN, RPCOMP CLEN P Clean and clear RF. 0.0 0.0 1/20/2022 01:00 1/20/2022 01:30 0.50 COMPZN, RPCOMP BHAH P M/U BHA #4 RBP #2 0.0 12.0 1/20/2022 01:30 1/20/2022 05:00 3.50 COMPZN, RPCOMP PULD P PUDP RIH w/ BHA #4 F/ 12' T/ 2,725 ft. Set RBP at 2,725 ft. 12.0 2,725.0 1/20/2022 05:00 1/20/2022 06:00 1.00 COMPZN, RPCOMP PRTS P PT 7" CSG to 1200 psi for 10 mins and charted same. 2,725.0 2,725.0 1/20/2022 06:00 1/20/2022 08:30 2.50 COMPZN, RPCOMP TRIP P TOOH standback drill pipe F/2,719 ft to surface. L/D BHA. 2,725.0 0.0 1/20/2022 08:30 1/20/2022 12:00 3.50 COMPZN, RPCOMP NUND P PJSM. ND BOPE & DSA and rig back on stump. 0.0 0.0 1/20/2022 12:00 1/20/2022 16:00 4.00 COMPZN, RPCOMP NUND P PJSM. RU Hydratight equipment to allow 7' CSG to grow. Start growing CSG. Had 16 cycle on the Hydratight tool with 9.5" of Casing growth. 0.0 0.0 1/20/2022 16:00 1/20/2022 17:30 1.50 COMPZN, RPCOMP NUND P Remove McEvoy Gen IV. Spear 7" CSG and pull 100K over block and string weight. Reset in emergency slips. L/D 7" spear. Additonal 19.5" of strech on 7" casing for an over length of 29". 0.0 0.0 1/20/2022 17:30 1/20/2022 21:30 4.00 COMPZN, RPCOMP WWSP P Make final cut on 7" with Whacs saw. Pull existing 7" x 11" pack off. Install new packoff. RILDS. Install Cameron C -Bowl conversion tubing spool. 0.0 0.0 1/20/2022 21:30 1/20/2022 22:00 0.50 COMPZN, RPCOMP PRTS P PT pack off void T/ 3000 PSI for 30 Min - Good test. As per Cameron Rep. Pre- load tubing spool with test plug. Record LDS measurements: 4 3/8" fully backed out. 4" for wear bushing. 3 3/4" for test plug and tubing spool. 0.0 0.0 1/20/2022 22:00 1/21/2022 00:00 2.00 COMPZN, RPCOMP NUND P N/U IA valves on new spool. N/U DSA and BOP. Take new RKB measurements. Install flow nipple. 0.0 0.0 1/21/2022 00:00 1/21/2022 02:30 2.50 COMPZN, RPCOMP NUND P Complete N/U BOP. Take new RKB measurements. Install flow nipple. 0.0 0.0 1/21/2022 02:30 1/21/2022 03:00 0.50 COMPZN, RPCOMP RURD P Fill stack w/ fresh water. Hook up chart recorder. 0.0 0.0 1/21/2022 03:00 1/21/2022 03:15 0.25 COMPZN, RPCOMP PRTS P PT break on BOP T/ 250/3000 PSI for 5 Min each - Good test. 0.0 0.0 1/21/2022 03:15 1/21/2022 04:30 1.25 COMPZN, RPCOMP RURD P Displace fresh water out of BOP. B/D lines. R/D chart recorder. 0.0 0.0 1/21/2022 04:30 1/21/2022 05:30 1.00 COMPZN, RPCOMP PRTS P Test 7" production casing T/ plug depth of 2725' w/ 2500 PSI for 30 Min - 0.0 0.0 1/21/2022 05:30 1/21/2022 06:00 0.50 COMPZN, RPCOMP RURD P Install wear bushing 6 3/16" ID. 0.0 0.0 1/21/2022 06:00 1/21/2022 10:00 4.00 COMPZN, RPCOMP PULD P TIH on singles and latch RBP at 2,725 ft. Up Wt 62K / DN wt 55K. 0.0 2,725.0 1/21/2022 10:00 1/21/2022 12:00 2.00 COMPZN, RPCOMP TRIP P TOOH and L/D RBP. 2,725.0 0.0 1/21/2022 12:00 1/21/2022 15:00 3.00 COMPZN, RPCOMP PULD P TIH on singles to retrieve second plug. 0.0 2,750.0 1/21/2022 15:00 1/21/2022 15:30 0.50 COMPZN, RPCOMP CIRC P Circulate surface to surface with 9.8 PPG KWF at 6 bpm, 560 psi. 118 bbls pumped. 2,750.0 2,750.0 1/21/2022 15:30 1/21/2022 16:00 0.50 COMPZN, RPCOMP PACK P Latch RBP, equalize pressure, release packer. 2,750.0 2,780.0 Rig: NABORS 7ES RIG RELEASE DATE Page 8/11 1L-29 Report Printed: 1/31/2022 Operations Summary (with Timelog Depths) Job: RECOMPLETION Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 1/21/2022 16:00 1/21/2022 18:30 2.50 COMPZN, RPCOMP TRIP P TOOH stand back DP F/ 2780' T/ surface, PUW=65K Static loss rate 120 Bbls/Hr 2,780.0 0.0 1/21/2022 18:30 1/21/2022 19:00 0.50 COMPZN, RPCOMP CLEN P Clean and clear RF. Mobilize fishing tools for BHA #8 0.0 0.0 1/21/2022 19:00 1/21/2022 21:00 2.00 COMPZN, RPCOMP BHAH P M/U BHA #8 Overshot T/ 133', PUW=40K. 0.0 133.0 1/21/2022 21:00 1/22/2022 00:00 3.00 COMPZN, RPCOMP PULD P RIH w/ BHA #8 while P/U DP T/ 2210, PUW=62K, SOW=59K 133.0 2,210.0 1/22/2022 00:00 1/22/2022 00:30 0.50 COMPZN, RPCOMP TRIP P RIH F/ 2210' T/ 2703'. PUW=63K, SOW=60K 2,210.0 2,703.0 1/22/2022 00:30 1/22/2022 01:00 0.50 COMPZN, RPCOMP SFTY P M/U TD set in slips. PJSM w/ rig crew on cut & slip drill line. Circulating 9.73 PPG NaCl down DP @ 3 BPM, 150 PSI. 2,703.0 2,703.0 1/22/2022 01:00 1/22/2022 03:00 2.00 COMPZN, RPCOMP SLPC P Cut & slip 84' of drill line. Service TD, blocks & crown. B/D TD Circulating 9.73 PPG NaCl down DP @ 3 BPM, 150 PSI. Total of 173 Bbls pumped. Pumps off, static loss rate = 84 BPH. Begin cutting KWF T/ 9.65 PPG 2,703.0 2,703.0 1/22/2022 03:00 1/22/2022 03:30 0.50 COMPZN, RPCOMP TRIP P RIH F/ 2703', tag fish top @ 2809', swallow T/ 2816'. PUW=63K, SOW=60K 2,703.0 2,809.0 1/22/2022 03:30 1/22/2022 04:00 0.50 COMPZN, RPCOMP FISH P P/U fire jars 1 time at 50K over string weight. Straight pull came free @ 145K. PUW=110K 2,809.0 11,404.0 1/22/2022 04:00 1/22/2022 04:30 0.50 COMPZN, RPCOMP OWFF P Observe well for flow - fluid level falling in the stack. No migration seen at surface. 11,373.0 11,373.0 1/22/2022 04:30 1/22/2022 07:30 3.00 COMPZN, RPCOMP TRIP P POOH w/ DP F/ 13737' T/ 8773', PUW=110K 11,373.0 8,724.0 1/22/2022 07:30 1/22/2022 09:00 1.50 COMPZN, RPCOMP BHAH P L/D BHA #8. Overshot cut lip was damaged. 2 stainless steel bands were recovered from in between overshot and cut joint. 8,724.0 8,591.0 1/22/2022 09:00 1/22/2022 10:00 1.00 COMPZN, RPCOMP RURD P C/O Handing Equipment R/U 4" tubing equipment. 8,591.0 8,591.0 1/22/2022 10:00 1/22/2022 23:00 13.00 COMPZN, RPCOMP PULL P Continue POOH and L/D production tubing T/ surface. Verified seal assembly was pulled. PUW=79K 8,591.0 0.0 1/22/2022 23:00 1/23/2022 00:00 1.00 COMPZN, RPCOMP RURD P R/D tubing handling equipment. Install DP elevators. Processing 3 1/2" EUE completion in pipe shed. 0.0 0.0 1/23/2022 00:00 1/23/2022 02:00 2.00 COMPZN, RPCOMP RURD P Processing 3 1/2" EUE completion in pipe shed. 0.0 0.0 1/23/2022 02:00 1/23/2022 04:45 2.75 COMPZN, RPCOMP RURD P Spot Halliburton slickline unit. R/U Halliburton slick sheaves and tool string. Processing 3 1/2" EUE completion in pipe shed. 0.0 0.0 1/23/2022 04:45 1/23/2022 06:30 1.75 COMPZN, RPCOMP SLKL P RIH w/ 5.46" OD junk catcher and set down at 11,326' 68 ft higher than the / PBR top @ 11394'. Continue Processing 3 1/2" EUE completion in pipe shed. OOH with slickline junk catcher, recovered 2 gallons of hard cement/sanded material, 1 SS band 2 pieces of SS control line from catcher. 0.0 0.0 Rig: NABORS 7ES RIG RELEASE DATE Page 9/11 1L-29 Report Printed: 1/31/2022 Operations Summary (with Timelog Depths) Job: RECOMPLETION Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 1/23/2022 06:30 1/23/2022 09:00 2.50 COMPZN, RPCOMP SLKL P RIH again with same Junk catcher. Tagged again 11,368 ft, worked junk catcher several times. POOH and check catcher. Recovered same amount of hard sand/scale material as the pervious run. 0.0 0.0 1/23/2022 09:00 1/23/2022 10:30 1.50 COMPZN, RPCOMP PULD P Load Baker tools to rig floor for clean out run with 5.375" x 6.5" casing scraper, boot basket and Bullnose. 0.0 0.0 1/23/2022 10:30 1/23/2022 16:30 6.00 COMPZN, RPCOMP BHAH P MU 5.375" x 6.5" casing scraper with 4.750" Boot basket x2, Jars and 4.750" Bullnose. Seen some drag on the 7" CSG at 10,636' down to 11,391' ft, 10- 15 weight swings. 0.0 133.0 1/23/2022 16:30 1/23/2022 19:00 2.50 COMPZN, RPCOMP CIRC P Start circulating while reciprocating at 4 bpm, 1050 psi. Pump 30 bbl High-Vis sweep around STS + losses until sweep cleaned up at surface. Pump total of 538 Bbls. No cutting increase seen at shakers when sweep returned. 133.0 11,391.0 1/23/2022 19:00 1/23/2022 19:45 0.75 COMPZN, RPCOMP OWFF P Obwerved well for flow. Returns deminished to nothing and fluid began falling in stack. B/D TD. Begin to filling hole. R/D blower hose on TD. 11,391.0 11,391.0 1/23/2022 19:45 1/24/2022 00:00 4.25 COMPZN, RPCOMP TRIP P POOH standing back DP F/ 11391' T/ 2466'. PUW=145K, SOW=100K. Static loss rate= ~44 BPH. 11,391.0 2,466.0 1/24/2022 00:00 1/24/2022 01:30 1.50 COMPZN, RPCOMP TRIP P POOH standing back DP F/ 2466' T/ 133'. PUW=60K Static loss rate= ~44 BPH. 2,466.0 133.0 1/24/2022 01:30 1/24/2022 02:30 1.00 COMPZN, RPCOMP BHAH P Stand back DC's. Clean out boot baskets, no solids in baskets. L/D jars, baskets, scrapper and bull nose T/ surface. 133.0 0.0 1/24/2022 02:30 1/24/2022 03:30 1.00 COMPZN, RPCOMP RURD P R/U slick line sheaves and make up tool string w/ CA2 plug, centralizers, roller bars and tapered guide. 0.0 0.0 1/24/2022 03:30 1/24/2022 05:30 2.00 COMPZN, RPCOMP SLKL P RIH w/ 2.75" CA2 plug on slick line targeting D nipple @ 11463'. 0.0 0.0 1/24/2022 05:30 1/24/2022 09:00 3.50 COMPZN, RPCOMP PRTS T PTSM and Crew C/O. Fluid pack and PT 7" Casing to 2500 psi for 30 min. Failed test, made several attempts. 0.0 0.0 1/24/2022 09:00 1/24/2022 10:00 1.00 COMPZN, RPCOMP RURD T PJSM. RDMO Slickline unit. 0.0 0.0 1/24/2022 10:00 1/24/2022 11:00 1.00 COMPZN, RPCOMP PULD T PU & Load Baker tools to the rig floor. 0.0 0.0 1/24/2022 11:00 1/24/2022 12:45 1.75 COMPZN, RPCOMP TRIP T MU Test packer and TIH on DP T/ 1525' COE. Set test packer. 0.0 1,525.0 1/24/2022 12:45 1/24/2022 13:30 0.75 COMPZN, RPCOMP PRTS T PT 7" CSG to 2500 psi for 30 mins. Good test. 1,525.0 1,525.0 1/24/2022 13:30 1/24/2022 16:00 2.50 COMPZN, RPCOMP TRIP T Release Test Packer and TIH F/2500' T/5001' COE. Set test packer 1,525.0 5,001.0 1/24/2022 16:00 1/24/2022 17:30 1.50 COMPZN, RPCOMP PRTS T PT 7" CSG to 2500 psi for 30 mins. Good test. 5,001.0 5,110.0 1/24/2022 17:30 1/24/2022 22:15 4.75 COMPZN, RPCOMP TRIP T Release Test Packer and TIH T/ 11364' COE. Set test packer. 5,001.0 11,364.0 1/24/2022 22:15 1/24/2022 23:15 1.00 COMPZN, RPCOMP PRTS T PT 7" CSG to 2500 psi for 30 mins. Failed test, chart mirrored intial test on existing packer @ 11408', inticating there is an integrety issue in 7" casing above 11364'. 11,364.0 11,364.0 1/24/2022 23:15 1/24/2022 23:45 0.50 COMPZN, RPCOMP TRIP T Release test packer and POOH T/ 10416' COE. Set test packer. Leak hunting. 11,364.0 10,416.0 Rig: NABORS 7ES RIG RELEASE DATE Page 10/11 1L-29 Report Printed: 1/31/2022 Operations Summary (with Timelog Depths) Job: RECOMPLETION Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 1/24/2022 23:45 1/25/2022 00:00 0.25 COMPZN, RPCOMP PRTS T PT 7" CSG to 2500 psi for 30 mins. Failed test, chart mirrored previouse test. 10,416.0 10,416.0 1/25/2022 00:00 1/25/2022 00:45 0.75 COMPZN, RPCOMP TRIP T Release test packer and POOH T/ 9468' COE. Set test packer. Leak hunting. 10,416.0 9,468.0 1/25/2022 00:45 1/25/2022 01:00 0.25 COMPZN, RPCOMP PRTS T PT 7" CSG to 2500 psi for 30 min - Failed test, chart mirrored previouse test. 9,468.0 9,468.0 1/25/2022 01:00 1/25/2022 01:45 0.75 COMPZN, RPCOMP TRIP T Release test packer and POOH T/ 8523' COE. Set test packer. Leak hunting. 9,468.0 8,523.0 1/25/2022 01:45 1/25/2022 02:45 1.00 COMPZN, RPCOMP PRTS T PT 7" CSG to 2500 psi for 30 min - Good test 8,523.0 8,523.0 1/25/2022 02:45 1/25/2022 03:15 0.50 COMPZN, RPCOMP TRIP T Release test packer and RIH T/ 8995' COE. Set test packer. Leak hunting. 8,523.0 8,995.0 1/25/2022 03:15 1/25/2022 03:30 0.25 COMPZN, RPCOMP PRTS T PT 7" CSG to 2500 psi for 15 min - Good test 8,995.0 8,995.0 1/25/2022 03:30 1/25/2022 04:00 0.50 COMPZN, RPCOMP TRIP T Release test packer and RIH T/ 9185' COE. Set test packer. Leak hunting. 8,995.0 9,185.0 1/25/2022 04:00 1/25/2022 04:15 0.25 COMPZN, RPCOMP PRTS T PT 7" CSG to 2500 - Failed test. 9,185.0 9,185.0 1/25/2022 04:15 1/25/2022 04:30 0.25 COMPZN, RPCOMP TRIP T Release test packer and POOH T/ 9090' COE. Set test packer. Leak hunting. 9,185.0 9,090.0 1/25/2022 04:30 1/25/2022 05:00 0.50 COMPZN, RPCOMP PRTS T PT 7" CSG to 2500 - Failed test. 9,090.0 9,090.0 1/25/2022 05:00 1/25/2022 05:30 0.50 COMPZN, RPCOMP TRIP T Release test packer and RIH T/ 9185' COE. Set test packer. 9,090.0 9,185.0 1/25/2022 05:30 1/25/2022 07:15 1.75 COMPZN, RPCOMP PRTS T PT 7" CSG to 2500 psi F/9,185 ft to top of packer at 11,408 ft. (Good Test). Release test packer and bleed down PSI. 9,185.0 9,185.0 1/25/2022 07:15 1/25/2022 09:00 1.75 COMPZN, RPCOMP WAIT P Waiting or orders from Town. 9,185.0 9,185.0 1/25/2022 09:00 1/25/2022 17:30 8.50 COMPZN, RPCOMP TRIP P PJSM. Received direction from town. TOOH laying down drill pipe. 9,185.0 0.0 1/25/2022 17:30 1/25/2022 22:00 4.50 COMPZN, RPCOMP PULD P Lay down drill pipe out of the derrick 0.0 0.0 1/25/2022 22:00 1/25/2022 23:30 1.50 COMPZN, RPCOMP CLEN P 0.0 0.0 1/25/2022 23:30 1/26/2022 00:00 0.50 COMPZN, RPCOMP RURD P Rig up to 3 ½ 9.3# L-80 EUE 8rd completion 0.0 0.0 1/26/2022 00:00 1/26/2022 06:00 6.00 COMPZN, RPCOMP PUTB P TIH with 3 ½ 9.3# L-80 EUE 8rd completion 0530-0600 Pre-tour meeting discussed upcoming ops hazards and mitigations. 0.0 2,050.0 1/26/2022 06:00 1/26/2022 08:00 2.00 COMPZN, RPCOMP PUTB T Power tongs failed to hold back up on tubing attemtpted to repair swapped with single stack tongs. 2,050.0 2,389.0 1/26/2022 08:00 1/27/2022 00:00 16.00 COMPZN, RPCOMP PUTB P Back online RIH with 3 ½ 9.3# L-80 EUE 8rd completion F/2389' to 11,393' 2,389.0 11,393.0 1/27/2022 00:00 1/27/2022 03:30 3.50 COMPZN, RPCOMP CRIH P Rig up & Pump 400 BBL’s CI 9.6# NaCl SxS from the trucks 11,393.0 11,393.0 1/27/2022 03:30 1/27/2022 05:30 2.00 COMPZN, RPCOMP PACK P Drop Ball & Rod Land seals in SBR Set packer and test to 1000 PSI for 10 minutes. 11,393.0 11,403.7 1/27/2022 05:30 1/27/2022 07:45 2.25 COMPZN, RPCOMP HOSO P Space out tubing LD 3 Joints Pick up 4.2' Space out pup. PU 2 singles M.U. TBG hanger/LD Jt 11,403.7 11,403.7 1/27/2022 07:45 1/27/2022 08:15 0.50 COMPZN, RPCOMP THGR P Land hanger RILDS, torque to 450 Ft/Lbs 11,403.7 11,403.7 Rig: NABORS 7ES RIG RELEASE DATE Page 11/11 1L-29 Report Printed: 1/31/2022 Operations Summary (with Timelog Depths) Job: RECOMPLETION Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 1/27/2022 08:15 1/27/2022 10:00 1.75 COMPZN, RPCOMP PRTS P Attemtpt to Pressure test tubing to 3000 PSI head pin leaked at EUE threads on landing joint, replaced seal ring in landing joint and reinstalled head pin. Test tubing to 3000 PSI for 30 minutes. Bleed tubing to 1500 PSI, Pressure IA to 2500 PSI for 30 minutes. bleed tubing to 0 PSI. IA pressure bled to 0. 11,403.7 11,403.7 1/27/2022 10:00 1/27/2022 10:30 0.50 COMPZN, RPCOMP RURD P Blow down surface lines and pump. L/D landing joint, 11,403.7 0.0 1/27/2022 10:30 1/27/2022 12:00 1.50 COMPZN, RPCOMP MPSP P Pick up T-bar install HP BPV, LD T-bar. Test HP-BPV from below to 1000 PSI for 10 minutes. 0.0 0.0 1/27/2022 12:00 1/28/2022 00:00 12.00 COMPZN, RPCOMP RURD P Perform BWM. replace annular 0.0 0.0 1/28/2022 00:00 1/28/2022 04:00 4.00 COMPZN, RPCOMP RGRP P Change out Element in the Anullar, Install Kill Line 0.0 0.0 1/28/2022 04:00 1/28/2022 07:00 3.00 COMPZN, RPCOMP NUND P N/D BOPE 0.0 0.0 1/28/2022 07:00 1/28/2022 09:30 2.50 COMPZN, RPCOMP NUND P NU adapter and Test to 5000 PSI tested good NU tree and and LRS, Pressure test LRS to 5000 test tree to 5000 PSI for 10 minutes. Tested good. 0.0 1/28/2022 09:30 1/28/2022 10:00 0.50 COMPZN, RPCOMP RURD P RU LRS to FP well. Warm lines to kill tank 1/28/2022 10:00 1/28/2022 11:00 1.00 COMPZN, RPCOMP FRZP P LRS pumped 80 BBL's diesel down IA at 1.5 BPM taking returns from tubing to kill tank. 1/28/2022 11:00 1/28/2022 11:30 0.50 COMPZN, RPCOMP RURD P Blow down line to kill tank RD LRS. 1/28/2022 11:30 1/28/2022 12:30 1.00 COMPZN, RPCOMP FRZP P U-Tube well for 1 hour. Simultaneously rig up bridal line. Rig: NABORS 7ES RIG RELEASE DATE Last Tag Annotation Depth (ftKB) End Date Wellbore Last Mod By Last Tag: RKB 12,226.0 1L-29 zembaej Last Rev Reason Annotation End Date Wellbore Last Mod By Rev Reason: Installed GLD, Pulled RHC Plug, Pulled CA-2 Plug, & Tagged TD 2/4/2022 1L-29 zembaej Casing Strings Casing Description CONDUCTOR OD (in) 16 ID (in) 15.06 Top (ftKB) 44.0 Set Depth (ftKB) 122.0 Set Depth (TVD) … 122.0 Wt/Len (l… 62.50 Grade H-40 Top Thread WELDED Casing Description SURFACE OD (in) 9 5/8 ID (in) 8.92 Top (ftKB) 43.0 Set Depth (ftKB) 6,045.0 Set Depth (TVD) … 3,698.2 Wt/Len (l… 36.00 Grade J-55 Top Thread BTC Casing Description PRODUCTION OD (in) 7 ID (in) 6.28 Top (ftKB) -55.5 Set Depth (ftKB) 11,768.0 Set Depth (TVD) … 5,993.7 Wt/Len (l… 26.00 Grade J-55 Top Thread BTC-MOD Casing Description LINER OD (in) 5 ID (in) 4.28 Top (ftKB) 11,463.6 Set Depth (ftKB) 12,522.0 Set Depth (TVD) … 6,319.3 Wt/Len (l… 18.00 Grade L-80 Top Thread LTC Liner Details Top (ftKB) Top (TVD) (ftKB) Top Incl (°) Item Des Com Nominal ID (in) 11,463.6 5,862.2 64.41 SLEEVE TIW LINER TIE BACK SLEEVE 5.265 11,472.6 5,866.1 64.41 PACKER TIW S-6 LINER TOP PACKER 4.390 11,474.4 5,866.9 64.41 HANGER TIW HYDRO LINER HANGER 4.216 Tubing Strings Tubing Description Tubing – Completion Upper String Ma… 3 1/2 ID (in) 2.99 Top (ftKB) 0.0 Set Depth (ft… 11,403.7 Set Depth (TVD) (… 5,836.3 Wt (lb/ft) 9.30 Grade L-80 Top Connection EUE 8rd Completion Details Top (ftKB) Top (TVD) (ftKB) Top Incl (°) Item Des Nominal ID (in) OD Nominal (in)Make Model Com 38.5 38.5 0.01 Hanger 2.950 7.100 Cameron CXS McEvoy Gen IV Tubing Hanger 527.5 526.8 6.53 Nipple - X 2.813 3.973 Halliburto n X Landing Nip 3-1/2" x 2.813" X-Nipple SN#0004556488-5 3,294.5 2,493.0 65.34 Mandrel 2.975 5.246 SLB KBMG,L HT4130 3-1/2" x 1" KBMG, LHT 4130, 9.3#, EUE 8RD SN#22302-13 5,817.3 3,596.7 63.63 Mandrel 2.975 5.249 SLB KBMG,L HT4130 3-1/2" x 1" KBMG, LHT 4130, 9.3#, EUE 8RD SN#22302.03 7,479.0 4,302.0 67.00 Mandrel 2.977 5.247 SLB KBMG,L HT4130 3-1/2" x 1" KBMG, LHT 4130, 9.3#, EUE 8RD SN#22302-08 8,914.2 4,838.7 68.69 Mandrel 2.977 5.242 SLB KBMG,L HT4130 3-1/2" x 1" KBMG, LHT 4130, 9.3#, EUE 8RD 2K SOV SN#22302-19 8,973.5 4,860.2 68.78 Locator 2.950 4.480 Baker 80-40 Locator Baker Locator 8,974.4 4,860.6 68.78 Seal Assembly 2.980 3.980 Baker GBH-SS, 80-40 GBH-SS, 80-40, Baker Seal Assembly (Spaced out 3' from fully located, OAL 11.86') 8,978.1 4,861.9 68.78 PBR (Polished Bore Receptacle) 4.000 5.880 Baker 0 80-40 Baker Polish Bore Receptacle 8,989.9 4,866.2 68.80 Packer 2.990 6.280 Baker H781-20- 0025 Baker "FHL" Retrievable Packer, 47B2-7" 26# 9,057.1 4,890.4 68.87 Nipple - X 2.813 3.973 Halliburto n X Landing Nip 2.813" X Landing Nipple w/RHC-M Installed SN4378911-02 11,390.9 5,830.8 64.45 Locator 2.950 4.480 Baker 80-40 Locator Baker Locator 11,391.9 5,831.3 64.45 Seal Assembly 2.980 3.980 Baker GBH-SS, 80-40 GBH-SS, 80-40, Baker Seal Assembly (Spaced out 3' from fully located,OAL 11.78') Tubing Description Tubing – Completion Lower String Ma… 4 1/2 ID (in) 2.99 Top (ftKB) 11,394.3 Set Depth (ft… 11,488.9 Set Depth (TVD) (… 5,873.1 Wt (lb/ft) Grade Top Connection Completion Details Top (ftKB) Top (TVD) (ftKB) Top Incl (°) Item Des Nominal ID (in) OD Nominal (in)Make Model Com 11,394.3 5,832.3 64.44 PBR 3.000 5.125 BAKER 80-40 PBR 11,408.6 5,838.5 64.41 PACKER 2.890 6.025 BAKER HB RETRIEVABLE PACKER 11,424.3 5,845.3 64.41 HYDRO TRIP 2.781 3.500 BAKER MODEL E HYDRO -TRIP PRESSURE SUB - ID 2.312" BEFORE SHIFTING; ID 2.781" AFTER SHIFTING 11,456.4 5,859.1 64.41 NIPPLE 2.750 4.540 CAMCO D NIPPLE NO GO 11,457.9 5,859.7 64.41 MULESHOE 2.992 4.500 MULESHOE Other In Hole (Wireline retrievable plugs, valves, pumps, fish, etc.) Top (ftKB) Top (TVD) (ftKB) Top Incl (°) Des Com Run Date ID (in) SN 12,357. 0 6,248.1 64.41 FISH 1 1/2" DMY w/ RK Latch Downhole 8/16/1991 0.000 1L-29, 2/23/2022 4:03:17 PM Vertical schematic (actual) LINER; 11,463.6-12,522.0 FISH; 12,357.0 IPERF; 12,320.0-12,330.0 IPERF; 12,174.0-12,213.0 APERF; 11,887.0-11,910.0 APERF; 11,877.0-11,887.0 APERF; 11,867.0-11,877.0 PRODUCTION; -55.5-11,768.0 PACKER; 11,408.6 Nipple - X; 9,057.1 Packer; 8,989.9 Mandrel; 8,914.2 Mandrel ; 7,479.0 SURFACE; 43.0-6,045.0 Mandrel; 5,817.3 Mandrel ; 3,294.5 Nipple - X; 527.5 CONDUCTOR; 44.0-122.0 Hanger; 38.5 KUP PROD KB-Grd (ft) 42.01 Rig Release Date 5/3/1991 1L-29 ... TD Act Btm (ftKB) 12,532.0 Well Attributes Field Name KUPARUK RIVER UNIT Wellbore API/UWI 500292215700 Wellbore Status PROD Max Angle & MD Incl (°) 69.24 MD (ftKB) 8,700.00 WELLNAME WELLBORE1L-29 Annotation Last WO: End Date 1/27/2022 H2S (ppm) 100 Date 8/2/2015 Comment SSSV: TRDP Mandrel Inserts St ati on N o/Top (ftKB) Top (TVD) (ftKB) Top Incl (°) Make Model OD (in) Serv Valve Type Latch Type Port Size (in) TRO Run (psi) Run Date Com 1 3,294.5 2,493.0 65.34 Schlum berger BK 1 GAS LIFT GLV 0.188 1,243.0 2/3/2022 2 5,817.3 3,596.7 63.63 Schlum berger BK 1 GAS LIFT OV 0.250 0.0 2/2/2022 3 7,479.0 4,302.0 67.00 Schlum berger BK 1 GAS LIFT DMY 0.000 0.0 1/27/2022 4 8,914.2 4,838.7 68.69 Schlum berger BK 1 GAS LIFT DMY 0.000 0.0 2/2/2022 Perforations & Slots Top (ftKB) Btm (ftKB) Top (TVD) (ftKB) Btm (TVD) (ftKB) Linked Zone Date Shot Dens (shots/ft )Type Com 11,867.0 11,877.0 6,036.4 6,040.8 C-4, 1L-29 7/22/1998 4.0 APERF 2 1/8" EJ, DP; 0 deg phasing, 0 deg orient 11,877.0 11,887.0 6,040.8 6,045.1 C-4, 1L-29 7/18/1998 4.0 APERF 2 1/2" HC, DPl; 180 deg phasing, 90 deg orient 11,887.0 11,910.0 6,045.1 6,055.0 C-4, 1L-29 2/14/1992 6.0 APERF 2 1/8" Dyna Strip; 0 deg. ph 12,174.0 12,213.0 6,169.0 6,185.9 A-5, 1L-29 6/29/1991 6.0 IPERF 3 3/8" Csg Gun; 60 deg. ph 12,320.0 12,330.0 6,232.1 6,236.4 A-4, 1L-29 6/29/1991 6.0 IPERF 3 3/8" Csg Gun; 60 deg. ph Notes: General & Safety End Date Annotation 6/3/2021 NOTE: Retrieved top 14.75" Section of Fish neck/outer mandrel of Patch packer at 2848'. See attach 3/26/2000 NOTE: WELL NAMED CHANGED FROM 1L-20X TO 1L-29 7/8/1998 NOTE: Blanking Plug will not Pass thru BOT sub @ 11424' to D Nipple 11/21/1997 NOTE: Retrieved HES RCP Pkr (Packing Element Left in Hole) w/ 0.5"" Choke 1L-29, 2/23/2022 4:03:18 PM Vertical schematic (actual) LINER; 11,463.6-12,522.0 FISH; 12,357.0 IPERF; 12,320.0-12,330.0 IPERF; 12,174.0-12,213.0 APERF; 11,887.0-11,910.0 APERF; 11,877.0-11,887.0 APERF; 11,867.0-11,877.0 PRODUCTION; -55.5-11,768.0 PACKER; 11,408.6 Nipple - X; 9,057.1 Packer; 8,989.9 Mandrel; 8,914.2 Mandrel ; 7,479.0 SURFACE; 43.0-6,045.0 Mandrel; 5,817.3 Mandrel ; 3,294.5 Nipple - X; 527.5 CONDUCTOR; 44.0-122.0 Hanger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y Samantha Carlisle at 8:10 am, Oct 08, 2021 321-533 Ron Phillips Digitally signed by Ron Phillips Date: 2021.10.07 12:41:18 -08'00' SFD 10/8/2021 SFD 10/8/2021 X SFD 10/8/2021 DSR-10/11/21 -00 VTL 10/13/21 10-404 X BOP test to 3000 psig Annular preventer test to 2500 psig JLC 10/14/2021 Jeremy Price Digitally signed by Jeremy Price Date: 2021.10.14 12:02:27 -08'00' RBDMS HEW 10/19/2021 !!"##"$ %&'%#(% '%#(%"')%# $#*%"$ !!"##"$ +#,*$--" $,%.'%#(% /% !!"##"$0 $,"''"1# $"+''#$."$ 2/"''"$.%$3+''# $,"''"1#'%#(%2$,4#-!"#%$11'"%"$&-$3411*%'5(*62$7 89/:; +'' 5%#3"''3%$3!1'3"$4'%#%13-"$,#%$3#&#"$, #%$35 %333"$ %$3<-"$.'%%(5%#&-$3%$31%,3"$ % =#$3'%(5%#3"#*3%$3% 1%,5%##"$ % <>=+"31-'',1%,".,&, 9/#"3%(%$3"5-'3$7%& 2&4-,%*%$4?-#"$#?-"%$4&-,"$&!%"$1'%#$%!% 9,11#35(*#1& 5"''"$'-31-''"$.,>@A B @!1'"$%$3"$#%''"$.%$5 B @ !1'"$#-1&% 9/#"3%( Ron Phillips Digitally signed by Ron Phillips Date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ast Tag Annotation Depth (ftKB) End Date Last Mod By Wellbore Last Tag: RKB (EST 104' FILL LEAVING 52' OF OPEN A- SANDS) 12,226.0 1/20/2018 pproven 1L-29 Last Rev Reason Annotation End Date Last Mod By Wellbore Rev Reason: Pull bait sub and top piece of patch packer. 6/3/2021 famaj 1L-29 Notes: General & Safety End Date 11/21/1997 Annotation NOTE: Retrieved HES RCP Pkr (Packing Element Left in Hole) w/ 0.5"" Choke Wellbore 1L-29 End Date 7/8/1998 Annotation NOTE: Blanking Plug will not Pass thru BOT sub @ 11424' to D Nipple Wellbore 1L-29 End Date 3/26/2000 Annotation NOTE: WELL NAMED CHANGED FROM 1L-20X TO 1L-29 Wellbore 1L-29 End Date 6/3/2021 Annotation NOTE: Retrieved top 14.75" Section of Fish neck/outer mandrel of Patch packer at 2848'. See attach Wellbore 1L-29 Casing Strings Csg Des OD (in) ID (in) Top (ftKB) Set Depth (ftKB) Set Depth (TVD) (ftKB) Wt/Len (lb/ft) Grade Top Thread Wellbore CONDUCTOR 16 15.06 44.0 122.0 122.0 62.50 H-40 WELDED 1L-29 SURFACE 9 5/8 8.92 43.0 6,045.0 3,698.2 36.00 J-55 BTC 1L-29 PRODUCTION 7 6.28 39.5 11,768.0 5,993.7 26.00 J-55 BTC-MOD 1L-29 LINER 5 4.28 11,463.6 12,522.0 6,319.3 18.00 L-80 LTC 1L-29 Tubing Strings Des String Max Nominal OD (in)ID (in) Top (ftKB) Set Depth (ftKB) Set Depth (TVD) (ftKB) Wt (lb/ft) Grade Top Thread Wellbore TUBING 4x3.5 4 3.48 38.5 11,488.9 5,873.1 11.00 J-55 DSS-HTC 1L-29 Completion Details Top (ftKB) Top (TVD) (ftKB) Top Incl (°) Item Des Com Nominal ID (in) Wellbore 38.5 38.5 0.01 HANGER MCEVOY GEN IV TUBING HANGER 4.000 1L-29 1,949.4 1,799.5 44.75 SAFETY VLV CAMCO TRDP-4A-SSA SAFETY VALVE 3.312 1L-29 3,973.7 2,786.4 65.09 XO Reducing CROSSOVER 4 x 3.5 3.500 1L-29 11,394.3 5,832.3 64.44 PBR BAKER 80-40 PBR 3.000 1L-29 11,408.6 5,838.4 64.41 PACKER BAKER HB RETRIEVABLE PACKER 2.890 1L-29 11,424.3 5,845.2 64.41 HYDRO TRIP BAKER MODEL E HYDRO-TRIP PRESSURE SUB - ID 2.312" BFORE SHIFTING; ID 2.781" AFTER SHIFTING 2.781 1L-29 11,456.3 5,859.1 64.41 NIPPLE CAMCO D NIPPLE NO GO 2.750 1L-29 11,457.9 5,859.7 64.41 MULESHOE MULESHOE 2.992 1L-29 Other In Hole (Wireline retrievable plugs, valves, pumps, fish, etc.) Top (ftKB) Top (TVD) (ftKB) Top Incl (°) Des Com Run Date ID (in) Wellbore 2,848.0 2,314.7 66.04 PATCH 3.11" PIIP (#CPP40002), SPACER PIPE, LATCH SEAL ASSY (#CPAL35053 / 1.62" ID / 30.9' OAL). UPPER 14.75" OF FISH NECK PULLED ON 6/2/21. BADLY CORRODED. SEE ATTACHMENT. ~10.75" OF INNER MANDREL STICKING UP. 2/20/2017 1.620 1L-29 6,507.0 3,894.6 65.25 PATCH 2.72" PARAGON II PACKER LOWER ANCHOR @ 6525' RKB. (#CPP35085, 2.72" OD, 1.62" ID, 4' LIH) - COVERD ST#4 GLM 9/1/2016 1.620 1L-29 6,507.0 3,894.6 65.25 PATCH 3.11" PIIP (#CPP40001 / 1.62" ID / 4.48' OAL) 2/20/2017 1.620 1L-29 12,357.0 6,248.1 64.41 FISH 1 1/2" DMY w/ RK Latch Downhole 8/16/1991 0.000 1L-29 Liner Details Top (ftKB) Top (TVD) (ftKB) Top Incl (°) Item Des Com Nominal ID (in) Wellbore 43.0 43.0 0.01 HANGER 8.921 1L-29 44.0 44.0 0.01 CONDUCTOR 15.062 1L-29 11,463.6 5,862.2 64.41 SLEEVE TIW LINER TIE BACK SLEEVE 5.265 1L-29 11,472.6 5,866.1 64.41 PACKER TIW S-6 LINER TOP PACKER 4.390 1L-29 11,474.4 5,866.9 64.41 HANGER TIW HYDRO LINER HANGER 4.216 1L-29 Perforations & Slots Top (ftKB) Btm (ftKB) Top (TVD) (ftKB) Btm (TVD) (ftKB) Linked Zone Date Shot Dens (shots/ft )Type Com Wellbore 11,867.0 11,877.0 6,036.4 6,040.8 C-4, 1L-29 7/22/1998 4.0 APERF 2 1/8" EJ, DP; 0 deg phasing, 0 deg orient 1L-29 11,877.0 11,887.0 6,040.8 6,045.1 C-4, 1L-29 7/18/1998 4.0 APERF 2 1/2" HC, DPl; 180 deg phasing, 90 deg orient 1L-29 11,887.0 11,910.0 6,045.1 6,055.0 C-4, 1L-29 2/14/1992 6.0 APERF 2 1/8" Dyna Strip; 0 deg. ph 1L-29 12,174.0 12,213.0 6,169.0 6,185.9 A-5, 1L-29 6/29/1991 6.0 IPERF 3 3/8" Csg Gun; 60 deg. ph 1L-29 12,320.0 12,330.0 6,232.1 6,236.4 A-4, 1L-29 6/29/1991 6.0 IPERF 3 3/8" Csg Gun; 60 deg. ph 1L-29 Mandrel Inserts St ati on No /S Top (ftKB) Top (TVD) (ftKB) Make Model OD (in) Serv Valve Type Latch Type Port Size (in) TRO Run (psi) Run Date Com Wellbore 1 2,119.9 1,916.8 CAMCO KBMG 1 GAS LIFT GLV BK 0.156 1,305.0 9/3/2016 1L-29 2 4,007.0 2,800.5 MMH FMHO 1 GAS LIFT GLV BK 0.188 1,312.0 9/3/2016 1L-29 3 5,370.3 3,402.3 MMH FMHO 1 GAS LIFT OV BK 0.188 0.0 9/3/2016 1L-29 4 6,513.1 3,897.2 MMH FMHO 1 GAS LIFT OPEN 0.000 8/15/2016 1L-29 5 7,757.5 4,410.4 MMH FMHO 1 GAS LIFT DMY BK2 0.000 0.0 5/28/2009 1L-29 6 9,095.1 4,904.1 MMH FMHO 1 GAS LIFT DMY BK2 0.000 0.0 9/18/2005 1L-29 7 10,399.8 5,406.6 MMH FMHO 1 GAS LIFT DMY BK2 0.000 0.0 7/1/1991 1L-29 8 11,334.3 5,806.5 MACCO SPM-2 1 1/2 GAS LIFT DMY RK 0.000 0.0 7/17/2016 1L-29 Comment SSSV: TRDP 1L-29, 6/3/2021 4:52:39 AM Vertical schematic (actual) LINER; 11,463.6-12,522.0 FISH; 12,357.0 IPERF; 12,320.0- 12,330.0 IPERF; 12,174.0- 12,213.0 APERF; 11,887.0- 11,910.0 APERF; 11,877.0- 11,887.0 APERF; 11,867.0- 11,877.0 PRODUCTION; 39.5- 11,768.0 MULESHOE; 11,457.9 NIPPLE; 11,456.3 HYDRO TRIP; 11,424.3 PACKER; 11,408.6 PBR; 11,394.3 GAS LIFT; 11,334.3 GAS LIFT; 10,399.8 GAS LIFT; 9,095.1 GAS LIFT; 7,757.5 PATCH; 6,507.0 GAS LIFT; 6,513.1 PATCH; 6,507.0 SURFACE; 43.0-6,045.0 GAS LIFT; 5,370.3 GAS LIFT; 4,007.0 PATCH; 2,848.0 GAS LIFT; 2,119.9 SAFETY VLV; 1,949.4 CONDUCTOR; 44.0- 122.0 HANGER; 38.5 KUP PROD KB-Grd (ft) 42.01 Rig Release Date 5/3/1991 Annotation Last WO: End DateH2S (ppm) 100 Date 8/2/2015... TD Act Btm (ftKB) 12,532.0 Well Attributes Field Name KUPARUK RIVER UNIT Wellbore API/UWI 500292215700 Wellbore Status PROD Max Angle & MD Incl (°) 69.24 MD (ftKB) 8,700.00 Legal Wellname 1L-29 Common Wellname1L-29 AK All Wellbores Schem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y Meredith Guhl at 11:07 am, May 06, 2021 321-232 Digitally signed by James Ohlinger DN: CN=James Ohlinger, O=ConocoPhillips, OU=CTD, E=James.J.Ohlinger@conocophillips.com, C=US Reason: I am the author of this document Location: your signing location here Date: 2021.05.06 10:55:16-08'00'Foxit PhantomPDF Version: 10.1.0 James Ohlinger 10-404 ; ADL0025669 DLB -00 DLB X X 2322 psig VTL 5/12/21 DLB 05/06/2021 DSR-5/6/21VTL 5/12/21 dts 5/12/2021 JLC 5/12/2021 5/13/2021Jeremy Price Digitally signed by Jeremy Price Date: 2021.05.13 12:55:49 -08'00' RBDMS HEW 5/13/2021 P.O. BOX 100360 ANCHORAGE, ALASKA 99510-0360 May 3, 2021 Commissioner - State of Alaska Alaska Oil & Gas Conservation Commission 333 West 7th Avenue Suite 100 Anchorage, Alaska 99501 Dear Commissioner: ConocoPhillips Alaska, Inc. hereby submits Sundry Application (10-403) to set an inflatable bridge plug at ~12,017’ to isolate from existing A-Sand perforations and set a whipstock at 11,850’ within 5” liner in KRU 1L-29 (PTD #191-051) to drill one CTD lateral using the coiled tubing drilling rig, Nabors CDR3-AC. CTD operations are scheduled to begin in mid-October 2021, though pre-rig work is planned to begin mid- May. The CTD objective will be to drill one lateral, KRU 1L-29L1, targeting the Kuparuk C-sand interval. Attached to this application are the following documents: 10-403 Sundry Application for KRU 1L-29 Operations Summary in support of the 10-403 Sundry Application Current Wellbore Schematic Proposed CTD schematic If you have any questions or require additional information, please contact me at 907-263-4112. Sincerely, Jeff Connelly ConocoPhillips Alaska Coiled Tubing Drilling Engineer Digitally signed by Jeff Connelly DN: C=US, OU=CTD, O=ConocoPhillips, CN=Jeff Connelly, E=jeff.s.connelly@conocophillips.com Reason: I am the author of this document Location: your signing location here Date: 2021.05.06 10:43:48-08'00' Foxit PhantomPDF Version: 10.1.0 Jeff Connelly Page 1 of 2 5/4/2021 KRU 1L-29 (PTD: 191-051) CTD Summary for Sundry (10-403) Summary of Pre-Rig Operations (items in bold apply to Sundry application): Well 1L-29 is a Kuparuk A/C-sand producer equipped with 4” x 3½” tubing and 5” liner. The CTD sidetrack will utilize one lateral to target the C4 sands to the east of 1L-29. Prior to CTD rig up, slick-line will pull an iso-sleeve and patches at 1949’, 2848’, and 6507’ respectively , and then drift to find bottom. Coiled tubing will perform a fill clean-out run down to approximately 12,050’ & then set an inflatable bridge plug (IBP) at approximately 12,017’ (isolating the well from existing A-Sand perforations; C-Sand perforations will remain). Slick-line will then dump ~10’ of sand on top of the IBP, drift a dummy whipstock, and re-set the patches and iso-sleeve at the same depths (above). Closer to CTD operations, slick-line will again pull the iso-sleeve and patches, e-line will then perform a GR/CCL log down to approximately 11,900’, and then set a 3.5” x 5” mechanical whipstock (TTWS) inside of the 5” liner at the planned kick-off point of 11,850’ MD. Reservoir Pressure and Maximum Downhole Pressure (Requirements of 20 AAC 25.005 (c)(4)(a)) The formation pressure in KRU 1L-29 was measured at 2914 psi @ 5980’ TVD (9.37 ppg) on 2/19/2017. The maximum downhole pressure in the 1L-29 vicinity is 1J-10 at 2880 psi @ 5895’ TVD (9.39 ppg – Measured 1/20/2019). Using the maximum formation pressure in the area at 2880 psi in 1J- 10 (i.e. 9.39 ppg EMW), the maximum potential surface pressure in 1L-29, assuming a gas gradient of 0.1 psi/ft, would be 2322 psi. Summary of CTD Objectives: The 1L-29L1 lateral will exit through the 5” casing at 11,850’ MD and drill to a planned TD of 18,300’ MD, targeting the C4 sands to the east. The lateral will be completed with 2-3/8” slotted liner from TD to the top-of-whipstock at 11,850’ with a deployment sleeve. CTD Pre-Rig, Drill, and Complete 1L-29L1 Sidetrack (summary): October 2021 Pre-CTD Work 1. Pre-CTD diagnostics (Tree & Ann-Comm diagnostics) 2. Slickline: Pull iso-sleeve & patches, PBTD (tag bottom) 3. CTU: FCO, set IBP 4. Slickline: Dump 10’ of sand on top of IBP, drift dummy whipstock, reset patches & iso- sleeve, obtain SBHP Steps 5 & 6 to be performed closer to CTD operations planned start date (approximately September timeframe) 5. Slickline: Pull iso-sleeve & patches 6. E-line: Log GR/CCL & set whipstock Rig Work (for reference) 1. MIRU Nabors CDR3-AC rig using 2” coil tubing. NU 7-1/16” BOPE, test. 2. 1L-29L1 Sidetrack (C4 sand - East) i. Mill 2.74” window at 11,850’ MD. set an inflatablegp pp y, bridge plug (IBP) at approximately 12,017’ (isolating the well from existing A-Sand perforations;gpg( ) pp y C-Sand perforations will remain). Sundry approved to here pyp@ Using the maximum formation pressure in the area at 2880 psi in 1J-( ppg )g pp 10 (i.e. 9.39 ppg EMW), the maximum potential surface pressure in 1L-29, assuming a gas gradient of ( ppg ), 0.1 psi/ft, would be 2322 psi. Page 2 of 2 5/4/2021 ii. Drill 3” bi-center lateral to TD of 18,300’ MD. iii. Run 2Ǫ” slotted liner with deployment sleeve from TD up to 11,850’ MD 3. Obtain SBHP, freeze protect, ND BOPE, and RDMO Nabors CRD3-AC. Post-Rig Work (for reference) 1. Re-set patches and iso-sleeve 2. Return to production Casing Strings Casing Description CONDUCTOR OD (in) 16 ID (in) 15.062 Top (ftKB) 44.0 Set Depth (ftKB) 122.0 Set Depth (TVD) … 122.0 Wt/Len (l… 62.50 Grade H-40 Top Thread WELDED Casing Description SURFACE OD (in) 9 5/8 ID (in) 8.921 Top (ftKB) 43.0 Set Depth (ftKB) 6,045.0 Set Depth (TVD) … 3,698.2 Wt/Len (l… 36.00 Grade J-55 Top Thread BTC Casing Description PRODUCTION OD (in) 7 ID (in) 6.276 Top (ftKB) 39.5 Set Depth (ftKB) 11,768.0 Set Depth (TVD) … 5,993.7 Wt/Len (l… 26.00 Grade J-55 Top Thread BTC-MOD Casing Description LINER OD (in) 5 ID (in) 4.276 Top (ftKB) 11,463.6 Set Depth (ftKB) 12,522.0 Set Depth (TVD) … 6,319.3 Wt/Len (l… 18.00 Grade L-80 Top Thread LTC Liner Details Top (ftKB) Top (TVD) (ftKB) Top Incl (°) Item Des Com Nominal ID (in) 11,463.6 5,862.2 64.41 SLEEVE TIW LINER TIE BACK SLEEVE 5.265 11,472.6 5,866.1 64.41 PACKER TIW S-6 LINER TOP PACKER 4.390 11,474.4 5,866.9 64.41 HANGER TIW HYDRO LINER HANGER 4.216 Tubing Strings Tubing Description TUBING 4x3.5 String Ma… 4 ID (in) 3.476 Top (ftKB) 38.5 Set Depth (ft… 11,488.9 Set Depth (TVD) (… 5,873.1 Wt (lb/ft) 11.00 Grade J-55 Top Connection DSS-HTC Completion Details Top (ftKB) Top (TVD) (ftKB) Top Incl (°) Item Des Com Nominal ID (in) 38.5 38.5 0.01 HANGER MCEVOY GEN IV TUBING HANGER 4.000 1,949.4 1,799.5 44.75 SAFETY VLV CAMCO TRDP-4A-SSA SAFETY VALVE 3.312 3,973.7 2,786.4 65.09 XO Reducing CROSSOVER 4 x 3.5 3.500 11,394.3 5,832.3 64.44 PBR BAKER 80-40 PBR 3.000 11,408.6 5,838.4 64.41 PACKER BAKER HB RETRIEVABLE PACKER 2.890 11,424.3 5,845.2 64.41 HYDRO TRIP BAKER MODEL E HYDRO-TRIP PRESSURE SUB - ID 2.312" BFORE SHIFTING; ID 2.781" AFTER SHIFTING 2.781 11,456.3 5,859.1 64.41 NIPPLE CAMCO D NIPPLE NO GO 2.750 11,457.9 5,859.7 64.41 MULESHOE MULESHOE 2.992 Other In Hole (Wireline retrievable plugs, valves, pumps, fish, etc.) Top (ftKB) Top (TVD) (ftKB) Top Incl (°) Des Com Run Date ID (in) 1,949.0 1,799.3 44.74 ISO SLEEVE ISO SLEEVE ON 3.13'' DB LOCK @ SAME ( 76'' OAL / MIN ID = 1.85'' ) 3/1/2017 1.850 2,848.0 2,314.7 66.04 PATCH 3.11" PIIP (#CPP40002), SPACER PIPE, LATCH SEAL ASSY (#CPAL35053 / 1.62" ID / 30.9' OAL) 2/20/2017 1.620 6,507.0 3,894.6 65.25 PATCH 2.72" PARAGON II PACKER LOWER ANCHOR @ 6525' RKB. (#CPP35085, 2.72" OD, 1.62" ID, 4' LIH) - COVERD ST#4 GLM 9/1/2016 1.620 6,507.0 3,894.6 65.25 PATCH 3.11" PIIP (#CPP40001 / 1.62" ID / 4.48' OAL) 2/20/2017 1.620 12,357.0 6,248.1 64.41 FISH 1 1/2" DMY w/ RK Latch Downhole 8/16/1991 0.000 Perforations & Slots Top (ftKB) Btm (ftKB) Top (TVD) (ftKB) Btm (TVD) (ftKB) Zone Date Shot Dens (shots/f t)Type Com 11,867.0 11,877.0 6,036.4 6,040.8 C-4, 1L-29 7/22/1998 4.0 APERF 2 1/8" EJ, DP; 0 deg phasing, 0 deg orient 11,877.0 11,887.0 6,040.8 6,045.1 C-4, 1L-29 7/18/1998 4.0 APERF 2 1/2" HC, DPl; 180 deg phasing, 90 deg orient 11,887.0 11,910.0 6,045.1 6,055.0 C-4, 1L-29 2/14/1992 6.0 APERF 2 1/8" Dyna Strip; 0 deg. ph 12,174.0 12,213.0 6,169.0 6,185.9 A-5, 1L-29 6/29/1991 6.0 IPERF 3 3/8" Csg Gun; 60 deg. ph 12,320.0 12,330.0 6,232.1 6,236.4 A-4, 1L-29 6/29/1991 6.0 IPERF 3 3/8" Csg Gun; 60 deg. ph Mandrel Inserts St ati on N o/Top (ftKB) Top (TVD) (ftKB) Make Model OD (in) Serv Valve Type Latch Type Port Size (in) TRO Run (psi) Run Date Com 1 2,119.9 1,916.8 CAMCO KBMG 1 GAS LIFT GLV BK 0.156 1,305.0 9/3/2016 2 4,007.0 2,800.5 MMH FMHO 1 GAS LIFT GLV BK 0.188 1,312.0 9/3/2016 3 5,370.3 3,402.3 MMH FMHO 1 GAS LIFT OV BK 0.188 0.0 9/3/2016 4 6,513.1 3,897.2 MMH FMHO 1 GAS LIFT OPEN 0.000 8/15/2016 5 7,757.5 4,410.4 MMH FMHO 1 GAS LIFT DMY BK2 0.000 0.0 5/28/2009 6 9,095.1 4,904.1 MMH FMHO 1 GAS LIFT DMY BK2 0.000 0.0 9/18/2005 7 10,399.8 5,406.6 MMH FMHO 1 GAS LIFT DMY BK2 0.000 0.0 7/1/1991 8 11,334.3 5,806.5 MACCO SPM-2 1 1/2 GAS LIFT DMY RK 0.000 0.0 7/17/2016 Notes: General & Safety End Date Annotation 11/21/1997 NOTE: Retrieved HES RCP Pkr (Packing Element Left in Hole) w/ 0.5"" Choke 7/8/1998 NOTE: Blanking Plug will not Pass thru BOT sub @ 11424' to D Nipple 3/26/2000 NOTE: WELL NAMED CHANGED FROM 1L-20X TO 1L-29 10/5/2010 NOTE: View Schematic w/ Alaska Schematic9.0 Comment SSSV: TRDP 1L-29, 1/26/2018 3:57:18 PM Vertical schematic (actual) LINER; 11,463.6-12,522.0 FISH; 12,357.0 IPERF; 12,320.0-12,330.0 IPERF; 12,174.0-12,213.0 APERF; 11,887.0-11,910.0 APERF; 11,877.0-11,887.0 APERF; 11,867.0-11,877.0 PRODUCTION; 39.5-11,768.0 MULESHOE; 11,457.9 NIPPLE; 11,456.3 HYDRO TRIP; 11,424.3 PACKER; 11,408.6 PBR; 11,394.3 GAS LIFT; 11,334.3 GAS LIFT; 10,399.8 GAS LIFT; 9,095.1 GAS LIFT; 7,757.5 PATCH; 6,507.0 GAS LIFT; 6,513.1 PATCH; 6,507.0 SURFACE; 43.0-6,045.0 GAS LIFT; 5,370.3 GAS LIFT; 4,007.0 PATCH; 2,848.0 GAS LIFT; 2,119.9 ISO SLEEVE; 1,949.0 SAFETY VLV; 1,949.4 CONDUCTOR; 44.0-122.0 HANGER; 38.5 Last Tag Annotation Last Tag: RKB (EST 104' FILL LEAVING 52' OF OPEN A-SANDS) Depth (ftKB) 12,226.0 End Date 1/20/2018 Last Mod By pproven Last Rev Reason Annotation Rev Reason: TAG, Pre-IPROF End Date 1/26/2018 Last Mod By pproven KUP PROD KB-Grd (ft) 42.01 Rig Release Date 5/3/1991 Annotation Last WO: End Date 1L-29 H2S (ppm) 100 Date 8/2/2015... TD Act Btm (ftKB) 12,532.0 Well Attributes Wellbore API/UWI 500292215700 Field Name KUPARUK RIVER UNIT Wellbore Status PROD Max Angle & MD Incl (°) 69.24 MD (ftKB) 8,700.00 !"#$#!%&'()*+'%,-)+.,*&%-.+"/""0/10"/21/001!/"1/"/""//34-%!"" 3/ 34-%53 4-%/" .&)66.-/12 01 34-%&-.#57&%%6 %-++'%-'(/ (-,%-+8,*)/0! ,*-%+8,*)'.-+8-/1! 9 -%-(4+.--:-/2 9 /0 957&% -%5)-%/0 1!2;11+8-2"1 02;11+8-02! 1! !"+8-/2 +&6-%,+0 /" <= /!1" 225"+8- +&6-%,+/!20 /" >6" . !/"" 9=3 ?2/!"" IBP • STATE OF ALASKA • AA"OIL AND GAS CONSERVATION COMMON REPORT OF SUNDRY WELL OPERATIONS 1.Operations Abandon r Rug Perforations r Fracture Stimulate r Pull Tubing r Operations shutdown r Performed: Suspend r Perforate r Other Stimulate r- Alter Casing r Change Approved Program r Rug for Redrill r Perforate New Pool r Repair Well 17 Re-enter Susp Well r Other: tbq patches f 2.Operator Name: 4.Well Class Before Work: 5.Permit to Drill Number: ConocoPhillips Alaska, Inc. Development 17 Exploratory r 191-0510 _ 3.Address: 6.API Number: P. O. Box 100360, Anchorage, Alaska 99510 Stratigraphic Service i" 50-029-22157-00 7.Property Designation(Lease Number): 8.Well Name and Number: ADL25660 KRU 1L-29 9.Logs(List logs and submit electronic and printed data per 20AAC25.071): 10.Field/Pool(s): N/A Kuparuk River Field/Kuparuk River Oil Pool 11.Present Well Condition Summary: Total Depth measured 12532 feet Plugs(measured) N/A true vertical 6324 feet Junk(measured) N/A Effective Depth measured 12210 feet Packer(measured) 1949, 2848,6507, 6507, 11409 true vertical 6185 feet (true vertical) 1799, 2315, 3895, 3895, 5838 Casing Length Size MD TVD Burst Collapse CONDUCTOR 78' 16 122' 122' SURFACE 6002' 9 5/8 6045' 3698' PRODUCTION 11729' 7 11768' 5994' LINER 1058' 5 12522' 6319' ED RECE Perforation depth: Measured depth: 11867'-11910', 12174'-12213', 12320'-12330' 1 V True Vertical Depth: 6036-6055', 6169'-6186', 6232'-6236' MAR 2 ` 1 ?017 Tubing(size,grade,MD,and TVD) 3 1/2 ,J-55, 11456 MD, 5859 TVD CC Packers&SSSV(type,MD,and TVD) SAFETY VLV=CAMCO TRDP-4A-SSA SAFETY VALVE @ 1949 MD and 1800 TVD ISO SLEEVE=ON 3.13" DB LOCK(76"OAL/MIN ID= 1.85")@ 1949 MD and 1799 TVD PATCH=3.11"PIIP, SPACER PIPE, LATCH SEAL ASSY, 3.11"PIIP(1.62"ID/30.9'OAL) @ 2848 MD and 2315 TVD PATCH=2.72"PIIP, SPACER PIPE, LOWER ANCHOR,2.72"PIIP(1.62" ID, 18'OAL) @ 6507 MD and 3895 TVD PACKER=BAKER HB RETRIEVABLE PACKER© 11409 MD and 5838 TVD 12.Stimulation or cement squeeze summary: N/A r. ®� D" Q r r,^ Intervals treated(measured): SCANNED APR.` ` 1.1 , Treatment descriptions including volumes used and final pressure: 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation N/A N/A N/A N/A N/A Subsequent to operation N/A N/A N/A N/A N/A 14.Attachments(required per 20 AAC 25.070,25.071,&25.283) 15.Well Class after work: Daily Report of Well Operations F Exploratory r Development F Service r Stratigraphic r Copies of Logs and Surveys Run r 16.Well Status after work: Oil F Gas r WDSPL r Printed and Bectronic Fracture Stimulation Data r GSTOR r WINJ r WAG r GINJ r SUSP r SPLUG r 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O.Exempt: N/A Contact Kelly Lyons/Brent Rogers Email: n1617@conocophillips.com Printed Nam- • -II . ons Title: Well Integrity Supervisor Signature , . 59-7224 Date ? _( 7 Form 1e-404 Revised 5 201RB®MS w MA )Submit Original Only 2r71-- 3/ z$ / I-T- ,f/ /7 LLuu�Il • • I RECEIVED ConocoPhillips LIAR 2 1 2017 Alaska P.O. BOX 100360 AOGCC ANCHORAGE,ALASKA 99510-0360 March 17, 2017 Commissioner Cathy Foerster Alaska Oil and Gas Conservation Commission 333 West 7th Avenue, Suite 100 Anchorage, AK 99501 Dear Commissioner Foerster: Enclosed please find the 10-404 Report of Sundry Operations for ConocoPhillips Alaska, Inc. KRU development well 1L-29 (PTD 191-051) for multiple retrievable patches set in the tubing above the packer. Please call Brent Rogers or myself at 659-7224 if you have any questions. Sincerely, r/ Kelly Lyons ConocoPhillips Well Integrity Supervisor Enclosures • 1 L-29 • DESCRIPTION OF WORK COMPLETED SUMMARY Date Event Summary 05/29/16 (AC EVAL) : SI-TIFL (Failed due to inflow& psi increase). POT-T (Passed). PPPOT-T (Passed). Initial T/I/0 = SI 1460/1345/420. IA FL @ 4807' (1706' above OV). T FL @ 4823'. Bled IA to 1055 psi in 30 min. T/I/O = 1275/1055/420 (T-185 psi). IA FL @ 3741' (infowed 1066'). T FL @ 3741' (inflowed 811'). 15 min T/I/0 = 1275/1155/420 (IA+150 psi). IA FL @ 3672' (inflowed 69'). T FL @ 3949' (inflowed 63'). 30 min T/I/0 = 1275/1160/420 (IA+5 psi). IA FL @ same location. TFL @ same location. Cracked T PO slotted bleeder w/unknown psi. Unable to bleed to 0 psi (gas). Attempt to torque T LDS to 450 lbs. All T LDS already @ 450 lbs. Back out each T LDS, clean corrosion/rust&apply kroil to LDS. Torque T LDS to 450 lbs (more movement). Cracked T PO slotted bleeder w/unknown psi. Bled to 0 psi (gas). Monitor for 15 min. 15 min = 0+ psi. Pressured T PO to 5000 psi. 15 min =4800 psi (-200). 30 min =4650 psi (-150). Pressure T PO to 5000 psi. 15 min =4850 psi (-150). 30 min =4800 psi (-50). Bled to 0 psi. Monitor for 15 min. 15 min = 0+ psi. T/I/0 = 1295/1165/420. IA FL @ 3672' (same location). T FL @ 3949' (same location). Bled IA to 950 psi in 17 min. T/I/0 = 1125/950/420 (T-170 psi). IA FL @ 2776' (inflowed 896'). TFL @ 3069' (inflowed 880'). 15 min T/I/0 = 1125/1015/420 (IA+65 psi). IA FL @ 2668' (inflowed 108'). T FL @ 2840' (inflowed 229'). 30 min T/I/0 = 1125/1015/420. IA FL @ same location. TFL @ same location. Final T/I/0 = SI 1125/1015/420. 07/14/16 SET 2.79" CATCHER ON SIM PLUG @ 11416' RKB.RAN LDL TO TOP OF CATCHER @ 11416' RKB.POL @ .5 BPM. NO SPINNER RESPONSE @ PLUG.LOGGED UP TO SURFACE.LEAK DETECTED @ 6518.5' RKB.APPEARS OV IN ST#4 @ 6513' RKB IS LEAKING.MADE STATIONARY STOPS ABOVE & BELOW GLM#4.NO OTHER LEAKS DETECTED IN TBG.JOB IN PROGRESS.... 07/18/16 CALIPER TBG FROM 11380' SLM TO SURFACE. IN PROGRESS. 08/31/16 SET 2.72" PARAGON II PACKER LOWER ANCHOR @ 6490' RKB. (#CPP35085, 2.72" OD, 1.62" ID, 4' LIH). *IN PROGRESS. • 1 L-29 • DESCRIPTION OF WORK COMPLETED 09/01/16 SET 3 1/2"TTS TEST TOOL INTO SAWN @ 6490' RKB. LRS PERFORMED CMIT- TxIA TO 2500#. PASSED. PULLED TEST TOOL. SET UPPER PATCH SECTION: 2.72" PARAGON II PACKER (CPP35086), SPACER PIPE, ANCHOR LATCH (CPAL35045), 18' ELEMENT TO ELEMENT, *IN PROGRESS. LRS PERFORMS CMIT-TxIA TO 2500#. PRE: 550/400/300 INITIAL: 2510/2325/310 15 MIN: 2490/2305/310 30 MIN: 2485/2300/310 09/02/16 SET 3 1/2"TTS TEST TOOL IN TOP OF PATCH @ 6507' RKB. LRS ATTEMPTED MIT-T TO 2500#. TBG PRESSURED UP TO 1300#THEN DROPPED & IA BEGAN TRACKING. PERFORMED CMIT-TxIA TO 2500#. PASSED. ATTEMPTED LDL FROM TOP OF PATCH. IA TRACKED BUT VERY SLOWER @ 1 GPM. PULLED ST#3 BK LV @ 5370' RKB, ST#2 BK LV @ 4007' RKB, &ST#1 BK LV @ 2120' RKB. IN PROGRESS. LRS ATTEMPTS MIT-T TO 2500#. @ 1300#WHP, PRESSURE DROPPED TO 700#& IA BEGAN TRACKING W/TBG. BEGIN CMIT-TxIA TO 2500#. PRE: 550/370/300 INITIAL: 2500/2380/300 15 MIN: 2460/2360/300 30 MIN: 2450/2350/300 09/03/16 SET LV IN ST#1 @ 2120' RKB, &ST#2 @ 4007' RKB. SET OV IN ST#3 @ 5370' RKB. LRS ATTEMPTED MIT-T TO 2500#, FAILED W/LLR OF .9 BPM @ 2500#. RAN LEAK DETECT LOG FROM 5400'TO 1800' RKB. IDENTIFIED LARGE LEAK IN TRSV @ 1949' RKB. *READY FOR SLICKLINE TO TRBLSHT TRSV. *TEST TOOL LEFT IN TOP OF PATCH @ 6507' RKB. 09/07/16 PULLED TTS TEST TOOL @ 6507' RKB. ATTEMPT SET 3.36" x 66" ISO SLEEVE ACROSS SSSV @ 1949' RKB, UNABLE TO PASS 60' SLM. IN PROGRESS. 09/08/16 RECOVERED ISO SLEEVE FROM 60' SLM. BRUSH N FLUSHED/GAUGED TBG TO 3.35" TO 1949' RKB. SET 3.36"x 66" ISO SLEEVE @ SAME. JOB COMPLETE. • 1L-29 • DESCRIPTION OF WORK COMPLETED 09/28/16 SUMMARY (AC EVAL) TIFL FAILED DUE TO PRESSURE INCREASE T POT&T PPPOT PASSED Initial T/I/O =230/1140/465 IA FL @ OV(5370') OA FL @ 42' SI lift gas in wellhouse (single blocked,twinned well).SI WH @ WV Stack T x IA 35 minutes T/I/O = 920/920/460 IA FL @ same' Bleed lift gas line to 230 psi Bleed IA 35 minutes T/I/O = 700/500/400 IA FL @ 5947' T FL @ 6013' 15 min T/I/O = 700/510/400 (+10 psi) T FL @ same IA FL @ 5964' (17' outflow) 30 min T/I/O = 700/525/400 (+15 psi) T FL @ same IA FL @ 5982' (18' outflow) 45 min T/I/O = 700/540/380 (+15 psi) T FL @ same IA FL @ 6014' (32' outflow) 60 min T/I/O = 700/550/360 (+10 psi) T FL @ same IA FL @ 6028' (14' outflow) Bled Lift gas line to 0 psi. Closed manual choke on lift gas line 120 min T/I/O = 700/600/330 (+50 psi)T FL @ same IA FL @ 5995' (33' inflow) 180 min T/I/O = 700/670/340 (+70 psi)T FL @ same IA FL @ 6014' (19' outflow) 240 min T/I/O = 700/730/320 T FL @ same IA FL @ 5997' (17' inflow) T POT Cracked T PO slotted bleeder bled to 0 psi (45 sec,gas entrained fluid) 15 min 0+ Rig up manifold to T PO TV and pressured to 5000 psi allow to stabilize 15 min 4600 psi (-400 psi) Repressured T PO TV to 5000 psi 15 min 4900 psi (-100 psi) 30 min 4870 psi (-30 psi) Bleed T PO TV to 0 Bleed IA to 220 psi in 45 minutes T/I/0 = 700/220/320 T FL @ same IA FL @ 5945' 15 min T/I/O = 700/250/320 (+30 psi) T FL @ same IA FL @ 5919' (26' inflow) 30 min T/I/0 = 700/290/320 (+40 psi) T FL @ same IA FL @ 6005' (86' outflow) 45 min T/I/0 = 700/340/320 (+50 psi)T FL @ same IA FL @ 5991' (14' inflow) 60 min T/I/O = 700/400/320 (+60 psi)T FL @ same IA FL @ 5978' (13' inflow) Final T/I/0 = 700/500/320 11/13/16 MIRU. RIH WITH ACX. PERFORM BASELINE DOWN FROM SURFACE TO 6500' ELMD AT 100 FPM. PRESSURE UP TUBING TO 3000 PSI. LOG 2 PASSES FROM 6500-6300 ELMD AT 20 FPM. TUBING HOLDING PRESSURE. BLED DOWN AND PRESSURE BACK UP TO 2500 PSI. LOG FROM 6500' TO SURFACE AT 20 FPM. TUBING PRESSURE NOT DROPPING. RDMO. JOB COMPLETE. IDENTIFIED LEAK @ 2832' 02/20/17 SET 3.11" PIIP (#CPP40001) MID ELEMENT @ 2848' RKB. CORRELATED TO LDL DATED 13-NOV-2016. SET 3.11" PIIP (#CPP40002), SPACER PIPE, LATCH SEAL ASSY (#CPAL35053) MID ELEMENT @ 2818' RKB. IN PROGRESS. 03/11/07 PULLED 3.66"x 66" ISO SLEEVE @ 1949' RKB. SET ISO SLEEVE ON 3.13" DB LOCK @ SAME ( 76" OAL/MIN ID = 1.85" ) JOB COMPLETE. IL-29 • DESCRIPTION OF WORK COMPLETED SUMMARY Date Event Summary 03/12/17 (AC EVAL) RE-TIFL- PASSED Initial T/I/O= 240/1200/580. IA FL @ 5370' OV. Shut in WH/AL line and stacked out T with lift gas. T/I/O= 1000/1015/480. IA FL @ same location. Bled AL line 240 psi. Bled IA 50 min. T/I/O= 1000/390/440. IA FL @ same location. 15 min. reading T/I/O= 1000/390/430 30 min. reading T/I/O= 1000/390/420. IA FL ©same location. 45 min. reading T/I/O= 1000/390/410 60 min. reading T/I/O= 1000/390/405. IA FL @ same location. Final T/I/O= 1000/390/405 EXECUTIVE '3 leak points were identified in the tubing. The lowest leak at 6513' across a GLM was patched SUMMARY with 30' TTS retrievable tubing patch equipment. The middle leak at 2832'was patched with 18' TTS retrievable tubing patch equipment. The uppermost leak across the SSSV at 1949'was effectively patched using a Colburn 76" ISOSLEEVE. Integrity was confirmed with passing TIFL. t KUP PROD • IL-29 ConocoPhillips /4 Well Attributes Max Angle&MD TD Alaska,Inc. Wellbore API/UWI Held Name Wel lbore Status ncl(°) MD(ftKB) Act Btm(ftKB) ,_ s■R 500292215700 KUPARUK RIVER UNIT PROD 69.24 8,700.00 12,532.0 onc••• Comment H23(ppm) Date Annotation End Date KB-Grd(ft) `Rig Release Date 1 L-29,5-166017'121 3'09 PM -'SSSV:TRDP 100 8/2/2015 Last WO: 42.01 5/3/1991 Vertical schematic(actual) - _ - Annotation Depth(ftKB) End Date Annotation Last Mod By End Date -...._..... ..._._. _ Last Tag:SLM 12,210.0 8/23/2013 Rev Reason:SET PATCH&ISO SLEEVE ON pproven 3/6/2017 ' ':11111 DB LOCK HANGER;38.5 �-=� Casing Strings ' ' '. . ' Casing Description OD(in) ID lin) Top(ftKB) Set Depth(ftKB) Set Depth(TVD)...Wt/Len(I...Grade Top Thread 1d. CONDUCTOR 16 15.062 44.0 122.0 122.0 62.50 H-40 WELDED iI Casing Description SURFACE OD(in) ID(in) Top(ftKB) Set Depth(ftKB) Set Depth(TVD)...WVLen(I...Grade Top Thread 9 5/8 8.921 43.0 6,045.0 3,698.2 36.00 1-55 BTC Casing Description SOD(in) ID(in) Top(ftKB) Set Depth(ftKB) Set Depth(ND)...Wt/Len(I...Grade Top Thread Iff l PRODUCTION 7 6.276 39.5 11,768.0 5,993.7 26.00 J-55 BTC-MOD Casing Description OD(in) ID(in) Top(ftKB) Set Depth(ftKB) Set Depth(TVD)... WVLen(I...Grade Top Thread 1 LINER 5 4.276 11,463.6 12,522.0 6,319.3 18.00 L-80 LTC ..AA/CONDUCTOR;44.0-122.0 - � Liner Details Nominal ID Top(RKB) Top(TVD)(ftKB) Top Ind(*) Item Des Com (in) SAFETY VLV;1,949.4 1111.1- 11,463.6 5,862.2 64.41 SLEEVE TIW LINER TIE BACK SLEEVE 5.265 ISO SLEEVE;1,949.0, _ 11,472.6' 5,866.1 64.41 PACKER TIW S-6 LINER TOP PACKER 4.390 11,474.4 5,866.9 64.41 HANGER TIW HYDRO LINER HANGER 4.216 Tubing Strings GAS LIFT;2,119.9 Tubing Description I String Ma...I ID 101 I Top(ftKB) (Set Depth(ft..f Set Depth(TVD)/..1..I Wt(Ib/ft) (Grade (Top Connection TUBING 4x3.5 4 3.476 38.5 11,488.91 5,873 11 001 0 J-55 DSS-HTC PATCH;2.848.0 Completion Details Nominal ID Top(ftKB) Top(ND)(ftKB) Top Incl(°) Item Des Com (in) 38.5 38.5 0.01 HANGER MCEVOY GEN IV TUBING HANGER 4.000 i 1,949.4 1,799.5 44.75 SAFETY VLV CAMCO TRDP-4A-SSA SAFETY VALVE 3.312 GAS LIFT;4,007.0 a. r.= 3,973.7 2,786.4 65.09 XO Reducing CROSSOVER 4 x3.5 3.500 11, 11,394.3 5,832.3 64.44 PBR BAKER 80-40 PBR 3.000 GAS LIFT;5,3703 11,408.6 5,838.4 64.41 PACKER BAKER HB RETRIEVABLE PACKER 2.890 11,424.3 5,845.2 64.41 HYDRO TRIP BAKER MODEL E HYDRO-TRIP PRESSURE SUB-ID 2.781 2.312"BFORE SHIFTING;ID 2.781"AFTER SHIFTING 11,456.3 5,859.1 64.41 NIPPLE CAMCO D NIPPLE NO GO 2.750 11,457.9 5,8597 64.41 MULESHOE MULESHOE 2.992 SURFACE;43.0.6045.0- Other In Hole(Wireline retrievable plugs,valves,pumps,fish,etc.) PATCH;6,507.0 Top(ND) Top Incl GAS LIFT;6,513.1 Top(ftKB) (ftKB) (°) Des Com Run Date ID(in) PATCH;6,507.0 - t 1,949.0 1,799.3 44.74 ISO SLEEVE ISO SLEEVE ON 3.13'DB LOCK @ SAME(76" 3/1/2017 1.850 OAL/MIN ID=1.85") 2,848.0 2,314.7 66.04 PATCH 3.11"PIIP(#CPP40002),SPACER PIPE,LATCH 2/20/2017 1.620 SEAL ASSY(#CPAL35053/1.62"ID/30.9'OAL) GAS LIFT;7,757.5 6,507.0 3,894.6 65.25 PATCH 2.72"PARAGON II PACKER LOWER ANCHOR @ 9/1/2016 1.620 6525'RKB.(#CPP35085,2.72"OD,1.62"ID,4'LII' -COVERD ST#4 GLM GAS LIFT;9,095.1 6,507.0 3,894.6 65.25 PATCH 3.11"PUP(#CPP40001/1.62"ID/4.48'OAL) 2/20/2017 1.620 12,357.0 6,248.1 64.41 FISH 1 1/2"DMY w/RK Latch Downhole 8/16/1991 0.000 GAS LIFT;10,399.8 Perforations&Slots Shot Dens GAS LIFT;11,334.3 Top(ND) Btm(ND) (shots/f Top(RKB) Btm(ftKB) (ftKB) (ftKB) Zone Date t) Type Com 11,867.0 11,877.0 6,036.4 6,040.8 C-4,1L-29 7/22/1998 4.0 APERF 2 1/8"EJ,DP;0 deg phasing,0 deg orient 11,877.0 11,887.0 6,040.8 6,045.1 C-4,1L-29 7/18/1998 4.0 APERF 21/2"HC,DPI;180 deg PER;11,394.3 0 1 phasing,90 deg orient PACKER;11,408.6 11,887.0 11,910.0 6,045.1• 6,055.0 C-4,1L-29 2/14/1992 6.0 APERF 21/8"Dyna Strip;O deg. ph HYDRO TRIP;11,424.3 MI 12,174.0 12,213.0 6,169.0 6,185.9 A-5,1L-29 6/29/1991 6.0 (PERF 3 3/8"Csg Gun;60 deg. ph NIPPLE;11.456.3 12,320.0 12,330.0 6,232.1 6,236.4 A-4,1L-29 6/29/1991 6.0'(PERF 3 3/8"Csg Gun;60 deg. ph 1 - Mandrel Inserts MULESHOE;11,457.9 St ati `!I on Top(ND) Valve Latch Port Size TRO Run N Top(ftKB) (ftKB) Make Model OD(In) Seri Type Type (in) (psi) Run Date Com 1 2,119.9 1,916.8 CAMCO KBMG 1 GAS LIFT GLV BK 0.156 1,305.0 9/3/2016 2 4,007.0 2,800.5 MMH FMHO 1 GAS LIFT GLV BK 0.188 1,312.0 9/3/2016 • 3 5,370.3 3,402.3 MMH FMHO 1 GAS LIFT OV BK 0.188 0.0 9/3/2016 4 6,513.1 3,897.2 MMH FMHO 1 GAS LIFT OPEN 0.000 8/15/2016 PRoOucnoN;39.5-11763.0 5 7,757.5 4,410.4 MMH FMHO 1 GAS LIFT DMY BK2 0.000 0.0 5/28/2009 --• 6 9,095.1 4,904.1 MMH FMHO 1 GAS LIFT DMY BK2 0.000 0.0 9/18/2005 APERF;11,867.0-11,877.0 7 10,399.8 5,406.6'MMH FMHO ' 1 GAS LIFT DMY BK2 0.000' 0.0 7/1/1991 ..- APERF;11,877.0-11,887.0 8 11,334.3 5,806.5 MACCO SPM-2 11/2 GAS LIFT DMY RK 0.000 0.0 7/17/2016 t - APERF;11.887.0-11,910.0 Notes:General&Safety End Date Annotation 11/21/1997 NOTE:Retrieved HES RCP Pkr(Packing Element Left in Hole)w/0.5""Choke 7/8/1998 NOTE:Blanking Plug will not Pass thru BOT sub©11424'to D Nipple IPERF;12,174.0-12,213.0 3/26/2000 -NOTE:WELL NAMED CHANGED FROM I L-20X TO 1L-29 10/5/2010 NOTE:View Schematic w/Alaska Schematic9.0 IPERF;12,320.0-12,330.0 FISH;12,357.0 t LINER;11.463.6-12.522.0 • rtl -05� • • 2' '11 WELL LOG TRANSMITTAL#903661837 To: Alaska Oil and Gas Conservation Comm. January 5, 2017 Attn.: Makana Bender 333 West 7th Avenue, Suite 100 RECEIVE Anchorage, Alaska 99501 R QGl JAN 092017 RE: Leak Detect Log with ACX: 1L-29 AOGCC Run Date: 11/13/2016 The technical data listed below is being submitted herewith. Please address any problems or concerns to the attention of: Fanny Sari, Halliburton Wireline &Perforating, 6900 Arctic Blvd., Anchorage, AK 99518 FRS_ANC@halliburton.com 1L-29 Digital Data in LAS format, Digital Log file, Interpretation Report 1 CD Rom 50-029-22157-00 Leak Detect Log with ACX(Processed Log) 1 Color Log 50-029-22157-00 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING A COPY OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: Halliburton Wireline &Perforating Attn: Fanny Sari �r � AIN2 1 6900 Arctic Blvd. '� Anchorage, Alaska 99518 Office: 907-275-2605 Fax: 907-273-3535 FRS_ANC@halliburton.com 119,04,0004„4" 6494,4, Date: Signed: RECEIVED • • \q1 -051 FEB 032017 -2:111 � WELL LOG TRANSMITTAL#903661837 AOGCC To: Alaska Oil and Gas Conservation Comm. February 1, 2017 Attn.: Makana Bender 333 West 7th Avenue, Suite 100 DATA LOGGED Anchorage, Alaska 99501 K.BENDE R RE: Leak Detect Log with ACX: 1L-29 Run Date: 11/13/2016 The technical data listed below is being submitted herewith. Please address any problems or concerns to the attention of: Fanny Sari, Halliburton Wireline &Perforating, 6900 Arctic Blvd., Anchorage, AK 99518 FRS_ANC@halliburton.com 1L-29 Digital Data in LAS format, Digital Log file, Interpretation Report 1 CD Rom 50-029-22157-00 *Re-Deliver CD due to incomplete digital data,E-Set#27871 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING A COPY OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: Halliburton Wireline&Perforating Attn: Fanny Sari 6900 Arctic Blvd. Anchorage, Alaska 99518 Office: 907-275-2605 Fax: 907-273-3535 FRS_ANC@halliburton.com Date: Signed:/ ��� 'a' 1Gv I3_ek4et n\ -o5t WELL LOG TRANSMITTAL DATA LOGGED PROACTIVE DIACjNOSTIC SERVICES, INC. $/c1/2016 l. K.BENDER To: AOGCC Ma333 a 7th er Avenue RECEIVED 333 West 7th Avenue 6•/ Suite 100t' Anchorage, Alaska 99501 PUG o 8 LA'S (907) 793-1225 r+ NOGG RE : Cased Hole/Open Hole/Mechanical Logs and /or Tubing Inspection(Caliper/ MTT) The technical data listed below is being submitted herewith. Please acknowledge receipt by returning a signed copy of this transmittal letter to the attention of : ProActive Diagnostic Services, Inc. Attn: Ryan C. Rupe 130 West International Airport Road Suite C Anchorage, AK 99518 SCANNED NOV Fax: (907) 245-8952 0 92016 1) Caliper Report 18-Jul-16 1L-29 1 Report /CD 50-029-22157-00 2) P2c/) Signed : Date : Print Name: PROACTIVE DIAGNOSTIC SERVICES, INC., 130 W.INTERNATIONAL AIRPORT RD SUITE C, ANCHORAGE, AK 99518 PHONE: (907)245-8951 FAX: (907)245-8952 E-MAIL: PDSANCHORAGE(C MEMORYLOG.COM WEBSITE:WWW.MEMORYLOG.COM D.\Achives\MasterTemplateFiles\Templates\Distribution\TransmittalSheets\ConocoPhillipsTransmit.docx ko.,\-05 l RECEIVE -2_712459 ' AUG,0 8 2016 AC)GCC Memory Multi-Finger Caliper . � Log Results Summary Company: ConocoPhillips Alaska, LLC. Well: 1L-29 Log Date: July 18, 2016 Field: Kuparuk Log No.: 15637 State: Alaska Run No.: 1 API No. 50-029-22157-00 Pipe Description: 4 inch 11 lb. J-55 DSS-HTC IPC Top Log Interval: Surface ' Pipe Use: Tubing Bottom Log Interval: 3,973 Ft. (MD) Pipe Description: 3.5 inch 9.3 lb. J-55 EUE 8rd AB-MOD Top Log Interval: 3,973 Ft. (MD) IPC Pipe Use: Tubing Bottom Log Interval: 11,404 Ft. (MD) Inspection Type : Corrosive & Mechanical Damage Inspection COMMENTS : This caliper data is tied into the top of SPM 2 at 11,334 feet(Driller's Depth). This log was run to assess the condition of the tubing with respect to corrosive and mechanical damage. The caliper recordings indicate the 4 inch tubing appears to be in good condition, with no significant wall penetration or areas of cross-sectional wall loss recorded. The caliper recordings indicate deposits throughout the 4 inch tubing, restricting the I.D. to 3.27 inches at 1,957 feet. A graph illustrating minimum recorded diameters on a joint-by-joint basis across the 4 inch tubing is included in this report. The caliper recordings indicate the 3.5 inch tubing logged appears to be in good condition, with no significant ' wall penetration or areas of cross-sectional wall loss recorded throughout the tubing logged. Although light deposits are recorded throughout the 3.5 inch tubing logged, no significant I.D. restrictions are recorded. A graph illustrating minimum recorded diameters on a joint-by-joint basis across the 3.5 inch tubing logged is included in this report. I 4 INCH TUBING - MAXIMUM RECORDED WALL PENETRATIONS : No significant wall penetrations (> 10%) are recorded throughout the 4 inch tubing. ' 4 INCH TUBING - MAXIMUM RECORDED CROSS-SECTIONAL METAL LOSS : No significant areas of cross-sectional wall loss (>4%) are recorded throughout the 4 inch tubing. 4 INCH TUBING - MAXIMUM RECORDED ID RESTRICTIONS : I f sarr;rtinr Mir',;r,I.D. Deposits 3.27 in. 48.3 1,957 Ft. (MD) No other significant I.D. restrictions are recorded throughout the 4 inch tubing. ' ProActive Diagnostic Services, Inc. / P.O. Box 1369, Stafford,TX 77497 Phone: (281)431-7100 or(888) 565-9085 Fax: (281)431-7125 E-mail: PDSAnalvsis(amemorylog.com Prudhoe Bay Field Office Phone: (907)659-2307 Fax: (907)659-2314 I I 3.5 INCH TUBING - MAXIMUM RECORDED WALL PENETRATIONS : ' No significant wall penetrations (> 18%)are recorded throughout the 3.5 inch tubing logged. 3.5 INCH TUBING - MAXIMUM RECORDED CROSS-SECTIONAL METAL LOSS : 1 No significant areas of cross-sectional wall loss (>6%) are recorded throughout the 3.5 inch tubing logged. 3.5 INCH TUBING - MAXIMUM RECORDED ID RESTRICTIONS : No significant I.D. restrictions are recorded throughout the 3.5 inch tubing logged. I I I 1 1 I I I B. Suhanek HY. Yang T. Smith =field Engineer(:; vst(.� ProActive Diagnostic Services, Inc. / P.O. Box 1369, Stafford,TX 77497 Phone: (281)431-7100 or(888) 565-9085 Fax: (281)431-7125 E-mail: PDSAnalysis(amemorvlog.com Prudhoe Bay Field Office Phone: (907)659-2307 Fax: (907) 659-2314 I iCorrelation of Recorded Damage to Borehole Profile I Pipe 1 4. in (24.6'-3,973.3') Well: 1L-29 I Pipe 2 3.5 in (3,973.3'-1 1,394.8') Field: Kuparuk Company: ConocoPhillips Alaska,Inc. Country: USA Survey Date: July 18, 2016 I III Approx.Tool Deviation ■ Approx.Borehole Profile 1 1 28 IGLM 8 i — 2,000 I GLM 7 :: 3,976 1 I GLM6 150 5,532 0S L GLM 5 I Z = 200 7,072 n. 0 1 GLM 4 250 , 8,631 IGLM 3 -- I GLM 2 _ 300 10,184 I SPM2 337.2 11,395 0 50 100 IDamage Profile(%wall)/Tool Deviation (degrees) IBottom of Survey=337.2 I I ili Minimum Diameter Profile IWell: 1L-29 Survey Date: July 18,2016 Field: Kuparuk Tool Type: UW MFC 24 No.218370 Company: ConocoPhillips Alaska,Inc. Tool Size: 1.69 inches ICountry: USA Tubing I.D.: 3.476 inches Minimum Measured Diameters (in.) 1.75 2 2.5 3 I 0.1 25 1.4 85 1 6 250 11 447 I 16 644 21- 840 I26- 1,036 31- 1,233 I36- 1,429 41- 1,624 I..- 46- 1,821 C E 0 7 E 48.3- 1,953 _ a 52.1 2,117 G I 57- , 7 2,282 62- 2,479 1 67 2,676 72 2,872 1 77 3,069 82 3,266 1 87 3,462 I 92 3,659 97 3,856 1 I 1 illi PDS Report Overview CI. _, Body Region Analysis IWell: 1 L-29 Survey Date: July 18,2016 Field: Kuparuk Tool Type: UW MFC 24 No.218370 Company: ConocoPhillips Alaska,Inc. Tool Size: 1.69 inches I Country: USA No. of Fingers: 24 Pipe 4 in. 11 ppf J-55 DSS HTC IPC Analyst: HY.Yang Pipe Nom.OD Weight Grade&Thread Nom.ID Top Depth Bottom Depth 1 4 in. 11 ppf J-55 DSS-HTC IPC 3.476 in. 25 ft. 3,973 ft. 1 Penetration(%wall) Damage Profile(%wall) 150 Penetration body Metal loss body 0 50 100 1 0.1 100 I I 50 111111 � 21 I 0 to 20 to 40 to over I 20% 40% 85% 85% Number of joints analyzed(total= 106) _ 106 0 0 0 ill 46 - Damage Configuration(body) 10 GLM 8(2:00) I 8 69 6 1 4 t 2 0 I Isolated General Line Other Hole/ 94 Pitting Corrosion Corrosion Damage Pos.Hole Number of joints damaged(total=0) 1 0 0 0 0 0 Bottom of Survey=99.1 I I PDS Report Joint Tabulation Sheet I Well: 1L-29 Survey Date: July 18,2016 Field: Kuparuk Analyst: HY. Yang Company: ConocoPhillips Alaska,Inc. I Pipe Description 4 in. 11 ppf J-55 DSS HTC IPC Tubing Nom. ID Body Wall Top Depth Bottom Depth 3.476 in. 0.262 in. 25 ft. 3,973 ft. Joint Jt.Depth Pen. Pen. Pen. Metal Min. Damage Profile No. (Ft.) Upset Body % Loss I.D. Comments (%wall) I (in.) (in.) % (in.) 0 50 100 0.1 25 0 0 0 0 3.38 Pup Lt. Deposits. 1 28 0 0.01 4 1 3.40 Lt.Deposits. ' 1.1 68 0 0.01 4 0 3.38 Pup Lt. Deposits. 1.2 73 0 0.01 4 0 3.37 Pup Lt. Deposits. 1.3 77 0 0.01 4 0 3.37 Pup Lt. Deposits. 1.4 85 0 0.01 4 0 3.34 Pup Lt. Deposits. 2 92 0 0.01 5 2 3.44 I 3 132 0 0.01 5 2 3.44 4 172 0 0.01 5 2 3.43 5 211 0 0.02 6 2 3.41 Lt.Deposits. 6 250 0 0.02 6 2 3.43 I 7 289 0 0.02 7 2 3.43 8 329 0 0.02 6 1 3.43 9 369 0 0.01 5 1 3.42 10 408 0 0.02 6 2 3.42 I447 0 0.01 5 2 3.43 12 486 0 0.01 5 1 3.43 13 525 0 0.01 5 1 3.43 14 564 0 0.02 6 2 3.42 I 15 604 0 0.02 7 1 3.43 16 644 0 0.02 8 2 3.42 17 683 0 0.01 5 2 3.43 18 722 0 0.02 6 1 3.43 I 19 761 0 0.01 5 1 3.41 Lt.Deposits. 20 801 0 0.02 7 2 3.41 Lt.Deposits. 21 840 0 0.02 6 2 3.43 22 879 0 0.01 5 1 3.40 Lt.Deposits. 23 918 0 0.01 5 2 3.42 I 24 958 0 0.02 6 2 3.42 25 997 0 0.02 6 2 3.42 26 1036 0 0.01 5 2 3.42 27 1075 0 0.01 5 2 3.43 28 1115 0 0.01 5 1 3.43 29 1154 0 0.01 5 2 3.44 30 1193 0 0.01 5 1 3.41 Lt.Deposits. 31 1233 0 0.02 6 2 3.41 Lt.Deposits. I 32 1272 0 0.02 6 2 3.40 Lt.Deposits. 33 1311 0 0.02 6 3 3.41 Lt.Deposits. 34 1351 0 0.01 5 1 3.40 Lt.Deposits. 35 1390 0 0.02 6 2 3.39 Lt.Deposits. I 36 1429 0 0.02 6 2 3.40 Lt.Deposits. 37 1469 0 0.01 5 2 3.39 Lt.Deposits. 38 1508 0 0.02 6 2 3.40 Lt.Deposits. 39 1547 0 0.02 6 2 3.39 Lt.Deposits. I 40 1585 0 0.02 9 2 3.37 Lt.Deposits. 41 1624 0 0.02 8 2 3.37 Lt.Deposits. 42 1664 0 0.02 8 2 3.35 Lt.Deposits. 43 1703 0 0.02 8 2 3.38 Lt.Deposits. 44 1743 0 0.02 8 3 3.37 Lt.Deposits. I45 1782 0 0.02 9 3 3.36 Lt.Deposits. IPenetration Body Metal Loss Body 1 1 Page 1 1 I I 111 CI Mt PDS Report Joint Tabulation Sheet I Well: 1L-29 Survey Date: July 18, 2016 Field: Kuparuk Analyst: HY. Yang Company: ConocoPhillips Alaska,Inc. I Pipe Description 4 in. 11 ppf J-55 DSS HTC IPC Tubing Nom. ID Body Wall Top Depth Bottom Depth 3.476 in. 0.262 in. 25 ft. 3,973 ft. Joint Jt.Depth Pen. Pen. Pen. Metal Min. Damage Profile No. (Ft.) Upset Body % Loss I.D. Comments (%wall) I (in.) (in.) % (in.) 0 50 100 46 1821 0 0.02 8 2 3.38 Lt.Deposits. • 47 1861 0 0.03 10 3 3.36 Lt.Deposits. C I 48 1900 0 0.02 7 2 3.37 Lt.Deposits. 48.1 1939 0 0.02 6 0 3.28 Pup Lt. Deposits. 48.2 1947 0 0 0 0 3.30 CAMCO TRDP-4A-SSA SSSV il 48.3 1953 0 0.01 4 0 3.27 Pup Deposits. 49 1960 0 0.02 7 3 3.38 Lt.Deposits. t I 50 2000 0 0.02 7 2 3.38 Lt.Deposits. 51 2039 0 0.02 7 2 3.37 Lt.Deposits. 52 2078 0 0.02 9 4 3.39 Lt.Deposits. 52.1 2117 0 0 0 0 3.36 GLM 8(LATCH @ 2:00) I 53 2125 0 0.03 10 2 3.38 Lt.Deposits. U 54 2165 0 0.02 8 3 3.40 Lt.Deposits. • C 55 2204 0 0.02 8 2 3.37 Lt.Deposits. 56 2244 0 0.02 7 2 3.38 Lt.Deposits. 0 I 57 2282 0 0.03 10 2 3.36 Lt.Deposits. 58 2322 0 0.02 9 2 3.36 Lt.Deposits. 59 2362 0 0.02 9 2 3.36 Lt.Deposits. • 60 2401 0 0.02 6 2 3.41 Lt.Deposits. 1 I 61 2440 0 0.02 7 2 3.38 Lt.Deposits. C 62 2479 0 0.02 8 2 3.37 Lt.Deposits. 63 2519 0 0.02 8 2 3.34 Lt.Deposits. 64 2558 0 0.02 8 2 3.39 Lt.Deposits. 65 2597 0 0.02 8 2 3.36 Lt.Deposits. I66 2636 0 0.02 6 2 3.40 Lt.Deposits. 67 2676 0 0.02 6 2 3.36 Lt.Deposits. C 68 2715 0 0.02 6 2 3.39 Lt.Deposits. 69 2754 0 0.02 7 2 3.38 Lt.Deposits. U I 70 2794 0 0.02 7 2 3.35 Lt.Deposits. 71 2833 0 0.02 8 2 3.34 Lt.Deposits. iiiU 72 2872 0 0.02 9 3 3.34 Lt.Deposits. C 73 2912 0 0.02 8 2 3.38 Lt.Deposits. I 74 2951 .0 0.03 10 3 3.36 Lt.Deposits. 75 2991 0 0.02 8 2 3.34 Lt.Deposits. 76 3029 0 0.02 9 2 3.39 Lt.Deposits. 77 3069 0 0.02 8 2 3.32 Lt.Deposits. I 78 3109 0 0.02 8 2 3.37 Lt.Deposits. • 79 3148 0 0.02 6 2 3.39 Lt.Deposits. 80 3188 0 0.02 9 2 3.38 Lt.Deposits. s 81 3227 0 0.02 8 2 3.40 Lt.Deposits. • I 82 3266 0 0.02 6 2 3.38 Lt.Deposits. 83 3305 0 0.02 7 2 3.41 Lt.Deposits. C 84 3345 0 0.02 6 2 3.39 Lt.Deposits. 85 3383 0 0.02 7 2 3.40 Lt.Deposits. C 86 3423 0 0.02 7 2 3.40 Lt.Deposits. I 87 3462 0 0.02 6 2 3.40 Lt.Deposits. 88 3501 0 0.02 8 2 3.39 Lt.Deposits. 1 89 3540 0 0.02 8 2 3.37 Lt.Deposits. • 90 3580 0 0.02 8 2 3.39 Lt.Deposits. • I 91 3620 0 0.02 9 2 3.39 Lt.Deposits. r IPenetration Body Metal Loss Body I Page 2 I I I III PDS Report Joint Tabulation Sheet CIO. , I Well: 1L-29 Survey Date: July 18, 2016 Field: Kuparuk Analyst: HY.Yang Company: ConocoPhillips Alaska,Inc. I Pipe Description 4 in. 11 ppf J-55 DSS HTC IPC Tubing Nom. ID Body Wall Top Depth Bottom Depth 3.476 in. 0.262 in. 25 ft. 3,973 ft. Joint Jt.Depth Pen. Pen. Pen. Metal Min. Damage Profile I No. (Ft.) Upset Body % Loss I.D. Comments (%wall) (in.) (in.) % (in.) 0 50 100 92 3659 0 0.02 8 2 3.34 Lt.Deposits. • 93 3699 0 0.02 8 2 3.39 Lt.Deposits. • I 94 3737 0 0.02 8 2 3.40 Lt.Deposits. U 95 3777 0 0.02 7 2 3.39 Lt.Deposits. 96 3816 0 0.02 8 2 3.37 Lt.Deposits. ii 97 3856 0 0.02 8 2 3.38 _ Lt.Deposits. 98 3895 0 0.02 9 3 3.36 _ Lt.Deposits. I 99 3934 0 0.02 9 2 3.38 Lt.Deposits. 99.1 3973 0 0 0 0 2.91 CROSS-OVER 4 X 3.5 I Penetration Body IMetal Loss Body I I I I I I I 1 I Page 3 i ! I I VS. PDS Report Cross Sections IWell: 1L-29 Survey Date: July 18,2016 Field: Kuparuk Tool Type: UW MFC 24 No.218370 Company: ConocoPhillips Alaska, Inc. Tool Size: 1.69 I Country: USA No. of Fingers: 24 Tubing: 4 in. 11 ppf J-55 DSS HTC IPC Analyst: HY.Yang I ICross Section for Joint 48.3 at depth 1,956.619 ft. I Tool speed=46 Nominal ID=3.476 Nominal OD=4 Remaining wall area= 100% Tool deviation=42° 1 � � 1 1 \ I: •I tr I i 1 I Minimum I.D.=3.267 in. IDeposits Minimum I.D.=3.27 in. HIGH SIDE=UP I I I I I IMinimum Diameter Profile I jil-S. Well: 1L-29 Survey Date: July 18,2016 Field: Kuparuk Tool Type: UW MFC 24 No.218370 Company: ConocoPhillips Alaska, Inc. Tool Size: 1.69 inches I Country: USA Tubing I.D.: 2.992 inches I Minimum Measured Diameters (in.) 1.75 2 2.25 2.5 2.75 1 99.1 1 1 3,973 108 4,230 111 118 4,539 128 4,846 138- 5,154 147 3 5,440 157- 5,748 I167- 6,054 177 6,360 1 186 6,644 196 6,949 I L 206- 7,260 cu C E 216- 7,571 I Z .c = 225. 7,858 a 235 8,167 0 O 1 245- 8,476 255- 8,788 1 264.1- 9,096 274 9,379 II284 9,687 294 9,997 I 304' 10,307 313' 10,588 II 323- 10,895 333' 11,203 I I IIII PDS Report Overview L0.,,__ Body Region Analysis IWell: 1 L-29 Survey Date: July 18,2016 Field: Kuparuk Tool Type: UW MFC 24 No.218370 Company: ConocoPhillips Alaska,Inc. Tool Size: 1.69 inches I Country: USA No. of Fingers: 24 Pipe 3.5 in. 9.3 ppf J 55 EUE 8rd AB MOD IPC Analyst: HY.Yang Pipe Nom.OD Weight Grade&Thread Nom.ID Top Depth Bottom Depth I 3.5 in. 9.3 ppf J-55 EUE 8RD AB-MOD IPC 2.992 in. 3,973 ft. 11,395 ft. IPenetration (%wall) Damage Profile(%wall) 250 MOM Penetration body on Metal loss body 0 50 100 I GLM 7(2:00) 200 awn I 150 100 1 GLM 6 (12:00) 150 50 0 0 to 20 to 40 to over GLM 5 (7:00) — -- I 20% 40% 85% 85% Number of joints analyzed(total=241) 200 241 0 0 0 1 —_-_- GLM 4(12:00) ___- __ Damage Configuration(body) 10 250 -- 8 I GLM 3 (3:00) 6 t 4 300 I 2 GLM 2 (9:00) 0 I Isolated General Line Other Hole/ Pitting Corrosion Corrosion Damage Pos.Hole Number of joints damaged(total= 7) SPM 2 (10:30) 1 6 0 1 0 0 Bottom of Survey=337.2 I I IN ' PDS Report Joint Tabulation Sheet I Well: 1L-29 Survey Date: July 18, 2016 Field: Kuparuk Analyst: HY. Yang Company: ConocoPhillips Alaska,Inc. I Pipe Description Nom. ID Body Wall Top Depth Bottom Depth 3.5 in. 9.3 ppf J-55 EUE 8RD AB-MOD IPC Tubing 2.992 in. 0.254 in. 3,973 ft. 11,395 ft. Joint Jt.Depth Pen. Pen. Pen. Metal Min. Damage Profile No. (Ft.) Upset Body % Loss I.D. Comments (%wall) I (in.) (in.) % (in.) 0 50 100 99.1 3973 0 0 0 0 2.95 CROSS-OVER 4 X 3.5 1003976 0 0.04 14 6 2.93 r I 100.1 4006 0 0 0 0 2.92 GLM 7(LATCH @ 2:00) 101 4013 0 0.02 9 2 2.93 102 4044 0 0.02 9 3 2.95 103 4074 0 0.03 10 2 2.92 Lt.Deposits. 104 4106 0 0.03 13 2 2.91 Lt.Deposits. I 105 4136 0 0.02 7 1 2.92 Lt.Deposits. 106 4168 0 0.02 8 2 2.93 Lt.Deposits. 107 4199 0 0.01 6 2 2.93 Lt.Deposits. 108 4230 0 0.02 7 1 2.92 Lt.Deposits. I 109 4260 110 4291 0 0.02 9 4 2.93 Lt.Deposits. 0 0.02 7 2 2.92 Lt.Deposits. 111 4322 0 0.03 10 2 2.93 Lt.Deposits. 112 4353 0 0.02 7 2 2.91 Lt.Deposits. I 113 4385 0 0.02 8 1 2.93 Lt.Deposits. 114 4416 0 0.03 10 2 2.93 Lt.Deposits. 115 4447 0 0.02 7 2 2.92 Lt.Deposits. 116 4478 0 0.02 6 1 2.92 Lt.Deposits. 117 4509 0 0.03 10 2 2.92 Lt.Deposits. 118 4539 0 0.02 9 2 2.94 119 4571 0 0.02 9 2 2.93 Lt.Deposits. 120 4601 0 0.03 10 2 2.94 I. r I 121 4632 0 0.02 9 2 2.93 Lt.Deposits. 122 4663 0 0.02 9 2 2.95 • 123 4694 0 0.02 8 2 2.92 Lt.Deposits. • 124 4725 0 0.03 12 3 2.94 125 4756 0 0.03 11 4 2.91 Lt.Deposits. I 126 4786 0 0.02 7 2 2.92 Lt.Deposits. 127 4815 0 0.03 11 2 2.92 Lt.Deposits. IN 128 4846 0 0.04 14 2 2.93 Lt.Deposits. Mi 129 4877 0 0.03 10 2 2.93 Lt.Deposits. • I 130 4908 0 0.02 9 2 2.89 Lt.Deposits. 131 4938 0 0.02 6 1 2.92 Lt.Deposits. •I 132 4968 0 0.02 7 2 2.93 133 4998 0 0.02 7 2 2.93 Lt.Deposits. • I 134 5029 0 0.02 7 2 2.91 Lt.Deposits. • 135 5061 0 0.02 7 2 2.92 Lt.Deposits. U 136 5092 0 0.02 8 2 2.94 • 1375123 0 0.02 9 4 2.94 I138 5154 0 0.03 11 2 2.89 Lt.Deposits. C 139 5184 0 0.02 7 1 2.92 Lt.Deposits. 140 5216 0 0.02 7 2 2.91 Lt.Deposits. � 141 5247 0 0.02 8 2 2.93 Lt.Deposits. II I 142 5278 0 0.02 8 3 2.93 Lt.Deposits. C 143 5309 0 0.02 9 2 2.93 Lt.Deposits. 144 5340 0 0.02 7 2 2.94 U 144.1 5371 0 0 0 0 2.92 GLM 6(LATCH @ 12:00) 145 5378 0 0.03 11 4 2.91 Lt.Deposits. C I146 5409 0 0.02 7 2 2.90 Lt.Deposits. IPenetration Body Metal Loss Body I Page 1 I ITIPS. PDS Report Joint Tabulation Sheet I Well: 1L-29 Survey Date: July 18,2016 Field: Kuparul< Analyst: HY. Yang Company: ConocoPhillips Alaska,Inc. I Pipe Description Nom. ID Body Wall Top Depth Bottom Depth 3.5 in. 9.3 ppf J-55 EUE 8RD AB-MOD IPC Tubing 2.992 in. 0.254 in. 3,973 ft. 11,395 ft. Joint Jt.Depth Pen. Pen. Pen. Metal Min. Damage Profile No. (Ft.) Upset Body % Loss I.D. Comments (%wall) I (in.) (in.) % (in.) 0 50 100 147 5440 0 0.02 9 2 2.94 J 148 5471 0 0.03 12 2 2.91 Lt.Deposits. 149 5502 0 0.02 9 2 2.93 Lt.Deposits. I 150 5532 0 0.02 8 3 2.92 Lt.Deposits. 151 5563 0 0.02 8 2 2.89 Lt.Deposits. 152 5594 0 0.02 8 2 2.92 Lt.Deposits. 153 5625 0 0.02 8 2 2.87 Lt.Deposits. I154 5656 0 0.03 13 4 2.92 Lt.Deposits. ■ 155 5686 0 0.03 13 3 2.87 Lt.Deposits. • 156 5717 0 0.02 9 2 2.90 Lt.Deposits. 157 5748 0 0.03 11 5 2.91 Lt.Deposits. ■ I158 5778 0 0.03 . 11 2 2.88 Lt.Deposits. ■ 159 5810 0 0.03 11 3 2.91 Lt.Deposits. 160 5840 0 0.02 8 2 2.91 Lt.Deposits. 161 5871 0 0.02 7 2 2.91 Lt.Deposits. I 162 5900 0 0.02 8 2 2.91 Lt.Deposits. 163 5932 0 0.03 10 3 2.93 Lt.Deposits. 164 5962 0 0.03 11 3 2.93 Lt.Deposits. 165 5993 0 0.02 9 3 2.93 Lt.Deposits. I 166 6023 0 0.03 10 3 2.91 Lt.Deposits. 167 6054 0 0.03 10 3 2.91 Lt.Deposits. 168 6085 0 0.02 7 2 2.92 Lt.Deposits. 169 6116 0 0.03 10 3 2.89 Lt.Deposits. I 170 6147 0 0.02 8 2 2.92 Lt.Deposits. 171 6178 0 0.02 9 2 2.92 Lt.Deposits. 172 6207 0 0.03 13 5 2.93 Lt.Deposits. ■ 173 6237 0 0.03 12 6 2.94 ■ 174 6268 0 0.03 13 4 2.91 Lt.Deposits. ■ I 175 6298 0 0.04 15 4 2.91 Shallow Pitting. Lt Deposits. le176 6329 0 0.04 15 3 2.91 Shallow Pitting. Lt Deposits. ■ 177 6360 0 0.04 15 4 2.92 Shallow Pitting. Lt Deposits. 178 6391 0 0.02 8 2 2.92 Lt.Deposits. 179 6422 0 0.03 11 2 2.92 Lt.Deposits. 180 6452 0 0.02 9 2 2.88 Lt.Deposits. 181 6483 0 0.04 15 4 2.92 Shallow Pitting. Lt Deposits. 181.1 6514 0 0 0 0 2.90 GLM 5(LATCH @ 7:00) I 182 6521 0 0.05 18 5 2.90 Shallow Pitting. Lt Deposits. 183 6551 0 0.02 9 2 2.91 Lt.Deposits. 184 6582 0 0.03 10 2 2.93 185 6613 0 0.02 9 3 2.91 Lt.Deposits. I 186 6644 0 0.03 10 2 2.92 Lt.Deposits. 187 6674 0 0.02 9 3 2.91 Lt.Deposits. 188 6705 0 0.03 11 4 2.88 Lt.Deposits. 189 6735 0 0.02 9 2 2.92 Lt.Deposits. I 190 6766 0 0.03 10 2 2.92 Lt.Deposits. ■ 191 6797 0 0.03 11 3 2.93 •■ 192 6828 0 0.03 11 2 2.90 Lt.Deposits. ■ 193 6858 0 0.03 11 2 2.92 Lt.Deposits. 194 6889 0 0.02 9 2 2.91 Lt.Deposits. I195 6919 0 0.03 11 2 2.93 Lt.Deposits. IPenetration Body Metal Loss Body I Page 2 I I III PDS Report Joint Tabulation Sheet I Well: Field: 1L-29 Survey Date: July 18, 2016 Kuparuk Analyst: HY. Yang Company: ConocoPhillips Alaska,Inc. I Pipe Description Nom. ID Body Wall Top Depth Bottom Depth 3.5 in. 9.3 ppf J-55 EUE 8RD AB-MOD IPC Tubing 2.992 in. 0.254 in. 3,973 ft. 11,395 ft. Joint Jt.Depth Pen. Pen. Pen. Metal Min. Damage Profile No. (Ft.) Upset Body % Loss I.D. Comments (%wall) I (in.) (in.) % (in.) 0 50 100 196 6949 0 0.02 9 2 2.92 Lt.Deposits. r 197 6980 0 0.03 13 3 2.90 Lt.Deposits. I 198 7010 0 0.02 9 3 2.92 Lt.Deposits. 199 7041 0 0.02 9 3 2.92 Lt.Deposits. 200 7072 0 0.03 10 2 2.92 Lt.Deposits. ■ 201 7103 0 0.03 12 4 2.90 Lt.Deposits. 202 7134 0 0.02 8 2 2.92 Lt.Deposits. I 203 7165 0 0.02 9 2 2.92 Lt.Deposits. 204 7197 0 0.02 7 2 2.94 205 7228 0 0.02 9 5 2.93 Lt.Deposits. 206 7260 0 0.03 10 3 2.92 Lt.Deposits. I 207 7290 208 7321 0 0.02 9 2 2.91 Lt.Deposits. 0 0.03 10 4 2.90 Lt.Deposits. 209 7352 0 0.03 11 6 2.93 Lt.Deposits. 210 7383 0 0.02 8 2 2.92 Lt.Deposits. I 211 7415 0 0.02 6 1 2.93 Lt.Deposits. 212 7445 0 0.03 11 5 2.93 Lt.Deposits. 213 7476 0 0.02 7 1 2.93 Lt.Deposits. 214 7508 0 0.02 7 2 2.93 Lt.Deposits. I 215 7539 0 0.02 7 1 2.92 Lt.Deposits. li 216 7571 0 0.03 10 2 2.93 Lt.Deposits. 217 7601 0 0.02 8 1 2.92 Lt.Deposits. 218 7633 0 0.02 9 2 2.93 Lt.Deposits. 219 7664 0 0.02 7 2 2.92 Lt.Deposits. I 220 7695 0 0.03 11 3 2.91 Lt.Deposits. 221 7727 0 0.02 7 2 2.93 Lt.Deposits. 221.1 7758 0 0 0 0 2.87 GLM 4(LATCH @ 12:00) 222 7765 0 0.02 9 2 2.88 Lt.Deposits. I223 7796 0 0.02 9 2 2.92 Lt.Deposits. 224 7827 0 0.02 8 2 2.93 Lt.Deposits. 225 7858 0 0.03 11 3 2.93 Lt.Deposits. 226 7888 0 0.02 9 2 2.90 Lt.Deposits. 1 227 7919 228 7951 0 0.02 7 1 2.93 Lt.Deposits. 0 0.02 7 2 2.92 Lt.Deposits. 229 7982 0 0.03 11 4 2.89 Lt.Deposits. 230 8012 0 0.02 7 2 2.92 Lt.Deposits. I 231 8043 0 0.03 10 3 2.92 Lt.Deposits. 232 8074 0 0.02 9 3 2.90 Lt.Deposits. 233 8105 0 0.02 9 3 2.90 Lt.Deposits. 234 8136 0 0.02 8 3 2.92 Lt.Deposits. I 235 8167 0 0.03 10 3 2.92 Lt.Deposits. ■ 236 8197 0 0.03 10 4 2.91 Lt.Deposits. ■ 237 8228 0 0.03 11 3 2.88 Lt.Deposits. • 238 8259 0 0.02 9 2 2.92 Lt.Deposits. 239 8291 0 0.03 11 3 2.92 Lt.Deposits. ■ I 240 8321 0 0.03 11 3 2.92 Lt.Deposits. 241 8352 0 0.02 9 1 2.93 Lt.Deposits. ■� 242 8384 0 0.02 9 2 2.91 Lt.Deposits. ■� 243 8415 0 0.03 11 3 2.92 Lt.Deposits. I244 8446 0 0.02 9 2 2.92 Lt.Deposits. IPenetration Body Metal Loss Body I Page 3 I ~ PDS Report Joint Tabulation Sheet I Well: 1L-29 Survey Date: July 18, 2016 Field: Kuparuk Analyst: HY. Yang Company: ConocoPhillips Alaska,Inc. I Pipe Description Nom. ID Body Wall Top Depth Bottom Depth 3.5 in. 9.3 ppf J-55 EUE 8RD AB-MOD IPC Tubing 2.992 in. 0.254 in. 3,973 ft. 11,395 ft. joint Jt.Depth Pen. Pen. Pen. Metal Min. Damage Profile No. (Ft.) Upset Body % Loss I.D. Comments (%wall) I (in.) (in.) % (in.) 0 50 100 245 8476 0 0.02 7 2 2.93 Lt.Deposits. 246 8507 0 0.03 11 3 2.89 Lt.Deposits. I 247 8538 0 0.02 8 2 2.87 Lt.Deposits. 248 8569 0 0.02 7 2 2.92 Lt.Deposits. 249 8600 0 0.02 9 2 2.91 Lt.Deposits. 250 8631 0 0.02 7 2 2.91 Lt.Deposits. 251 8663 0 0.03 10 2 2.91 Lt.Deposits. r I 252 8694 253 8725 0 0.03 10 2 2.91 Lt.Deposits. 0 0.02 9 2 2.92 Lt.Deposits. 3 254 8757 0 0.02 8 2 2.93 Lt.Deposits. 255 8788 0 0.03 10 2 2.90 Lt.Deposits. ■ I 256 8819 0 0.03 13 3 2.92 Lt.Deposits. ■ 257 8850 0 0.03 11 2 2.90 Lt.Deposits. 7 258 8880 0 0.02 7 2 2.89 Lt.Deposits. 259 8911 0 0.03 12 4 2.91 Lt.Deposits. ■ I 260 8942 0 0.03 12 3 2.92 Lt.Deposits. 261 8973 0 0.02 9 3 2.92 Lt.Deposits. 262 9004 0 0.03 11 2 2.91 Lt.Deposits. ■J 263 9035 0 0.02 8 2 2.92 Lt.Deposits. d I 264 9066 0 0.04 16 6 2.92 Shallow Pitting. Lt Deposits. 264.1 9096 0 0 0 0 2.92 GLM 3(LATCH @ 3:00) 265 9103 0 0.03 13 4 2.92 Lt.Deposits. ■ 266 9133 0 0.03 13 2 2.92 Lt.Deposits. I 267 9164 268 9194 0 0.02 9 2 2.93 Lt.Deposits. 0 0.03 11 4 2.90 Lt.Deposits. 269 9225 0 0.02 9 2 2.92 Lt.Deposits. ii . 270 9256 0 0.03 11 2 2.93 Lt.Deposits. 271 9287 0 0.03 . 10 3 2.93 Lt.Deposits. I 272 9317 0 0.02 9 2 2.90 Lt.Deposits. I] 273 9348 0 0.02 9 2 2.92 Lt.Deposits. 274 9379 0 0.03 12 3 2.91 Lt.Deposits. 275 9410 0 0.02 8 2 2.91 Lt.Deposits. I 276 9440 0 0.03 12 3 2.92 Lt.Deposits. 277 9471 0 0.02 9 2 2.91 Lt.Deposits. 278 9502 0 0.03 12 2 2.91 Lt.Deposits. 279 9533 0 0.02 8 2 2.91 Lt.Deposits. II] I 280 9563 0 0.03 10 3 2.92 Lt.Deposits. 281 9594 0 0.03 10 3 2.92 Lt.Deposits. 282 9625 0 0.02 9 3 2.93 Lt.Deposits. 283 9656 0 0.02 9 3 2.91 Lt.Deposits. I 284 9687 0 0.02 9 2 2.91 Lt.Deposits. 285 9718 0 0.02 8 2 2.93 Lt.Deposits. 286 9749 0 0.02 9 4 2.92 Lt.Deposits. 287 9779 0 0.02 9 2 2.93 Lt.Deposits. I 288 9809 0 0.02 8 2 2.90 Lt.Deposits. 289 9841 0 0.02 7 2 2.93 Lt.Deposits. 290 9872 0 0.02 8 2 2.91 Lt.Deposits. 291 9903 0 0.02 9 2 2.89 Lt.Deposits. 292 9934 0 0.02 9 3 2.86 Lt.Deposits. I293 9966 0 0.03 11 3 2.90 Lt.Deposits. IPenetration Body Metal Loss Body I Page 4 I I lib 4-4 0 . PDS Report Joint Tabulation Sheet I Well: 1L-29 Survey Date: July 18, 2016 Field: Kuparuk Analyst: HY.Yang Company: ConocoPhillips Alaska,Inc. I Pipe Description Nom. ID Body Wall Top Depth Bottom Depth 3.5 in. 9.3 ppf J-55 EUE 8RD AB-MOD IPC Tubing 2.992 in. 0.254 in. 3,973 ft. 11,395 ft. Joint Jt.Depth Pen. Pen. Pen. Metal Min. Damage Profile No. (Ft.) Upset Body % Loss I.D. Comments (%wall) I (in.) (in.) % (in.) 0 50 100 294 9997 0 0.02 9 3 2.90 Lt.Deposits. C 295 10029 0 0.02 8 1 2.92 Lt.Deposits. • 296 10059 0 0.02 9 1 2.91 Lt.Deposits. I 297 10091 0 0.02 8 2 2.92 Lt.Deposits. U 298 10122 0 0.01 6 1 2.93 • 299 10153 0 0.02 8 2 2.91 Lt.Deposits. 300 10184 0 0.02 7 2 2.92 Lt.Deposits. I I 301 10216 0 0.02 7 1 2.92 Lt.Deposits. 302 10247 0 0.03 11 2 2.90 Lt.Deposits. it 303 10276 0 0.02 . 7 2 2.91 Lt.Deposits. 304 10307 0 0.02 9 4 2.88 Lt.Deposits. I 305 10339 0 0.03 11 4 2.92 Lt.Deposits. 306 10370 0 0.03 13 3 2.83 Lt.Deposits. • 306.1 10401 0 0 0 0 2.91 GLM 2(LATCH @ 9:00) 307 10408 0 0.04 17 4 2.87 Shallow Pitting. Lt Deposits. I 308 1043 7 0 0.02 8 2 2.93 309 10469 0 0.02 8 2 2.93 310 10498 0 0.02 9 2 2.90 Lt.Deposits. 311 10526 0 0.03 11 4 2.91 Lt.Deposits. I 312 10557 0 0.02 9 2 2.93 Lt.Deposits. 313 10588 0 0.02 6 2 2.91 Lt.Deposits. 314 10618 0 0.03 10 4 2.90 Lt.Deposits. • 315 10649 0 0.02 9 2 2.92 Lt.Deposits. • 316 10680 0 0.02 7 2 2.92 Lt.Deposits. I 317 1071 1 0 0.02 7 1 2.92 Lt.Deposits. U 318 10742 0 0.02 8 3 2.93 Lt.Deposits. lit 319 10773 0 0.02 8 2 2.92 Lt.Deposits. 320 10803 0 0.02 6 2 2.93 Lt.Deposits. I 321 10834 0 0.02 9 2 2.93 Lt.Deposits. 322 10865 0 0.03 10 2 2.92 Lt.Deposits. l• 323 10895 0 0.02 7 2 2.91 Lt.Deposits. 324 10926 0 0.02 9 2 2.91 Lt.Deposits. A I 325 10957 0 0.02 9 3 2.93 Lt.Deposits. U 326 10987 0 0.02 8 2 2.90 . Lt.Deposits. I • 327 11018 0 0.02 7 2 2.91 Lt.Deposits. 328 11050 0 0.02 8 2 2.93 Lt.Deposits. • I 329 11080 0 0.02 6 2 2.94 330 11111 0 0.02 8 2 2.93 331 11142 0 0.02 7 2 2.92 Lt.Deposits. 332 11172 0 0.02 9 3 2.93 Lt.Deposits. I 333 11203 0 0.02 8 3 2.92 Lt.Deposits. 334 11234 0 0.02 8 3 2.90 Lt.Deposits. 335 11263 0 0.02 9 4 2.91 Lt.Deposits. 336 11294 0 0.02 7 2 2.90 Lt.Deposits. I 336.1 11326 0 0.01 4 0 2.92 Pup Lt. Deposits. I 336.2 11335 0 0 0 0 2.87 SPM 2 (LATCH @ 10:30) 336.3 11344 0 0.02 7 2 , 2.90 Pup Lt. Deposits. 337 11354 0 0.02 6 2 2.91 Lt.Deposits. 1 337.1 11386 0 0.01 5 2 2.91 Pup Lt. Deposits. I337.2 11395 0 0 0 0 2.80 BAKER 80-40 PBR IPenetration Body Metal Loss Body I Page 5 I v•- ' ,,Lak,, T PROD , ConocoPhillips calm' :: .36A- 'MobutAT, Max Angle EL MD Tr, 44a614.71.14Ae. :Istislises AMAPA 1..v+c 44....; i „, Conswort 'SSS'j- .144'° Illostracmce Emil 1,r. '' c'.;,;;'i Lag WO - -.-...' 769 SW 17211.4 I ...... - Sine Strings I.c-4*.sioup.“..-c.Tc7:- =• .- sion9,7 -......,,,9Ka_."---5....^ r.....r.r 1V7'_ sr-.,q Art ,Stra4_:-,iiirin.too Thrs ^5 OE 2 .1i •,-,'7 4:„ -, Sitv.912_, soll,,'D -44"4,141 444'-7'.(1111,,,- 941*14014,ITV-01- ri,r,9.41.,,3814.11-.4;01,4140”4.4 ISURFACE 95.3 Y ' 4--,; , ,.5,7. ,'45;2 3500 ' 4-55 t44444.11444416.44. iiiiirio_ shrel m 4,..heel ser r.cr,i, 5.. 1/^ .r....01 S...9 W4-;544.I-4ti.ft iVirl,T".4,3 I ..,, .,. I iik, .00,...c-,,c,,, 7 61:r '4' '' '6,..'; ' ''.:r 2446 040 J-455 EITC.)k)::,_ ca&Ite ClesTu11184•8 Shrir.9 0_, Solna.0 ',,,,r4_8 3.1.9.p.t, Sr.-C`.4-m- rw0; 'PI 041E A yn_ shirr 41..firr4;44144114,11 . 422,!9 -1E3'6 'i 1.2,"1; f:I%3 _ „..1.; a ,5xii . .7--k.,.,/v,:,..,,_---,-,...,„?., ,_,,,,„- „,......_.... ....._.__...., .;Top 04141, I '.- •,•_ _. ,41-1 i a: i a: VIIrD; i,, ri7rfr538÷112-2-5-r:4AC.'1* '''''''' r1V-T1--ftiEN TIE SAEk SLEEVE C'''''''.4 _ k 7,1. I lir 1 19,472E. 5 f.q.6 77 64..1,..%,,,.:::KF 6 TAN 5-61.1144Eilf64$3 PACKV4 1.. i 74 4 5 t&t.rai 6,4 41,k8,riE11. -111WHYttRO LIAltiff44 .CAft .4..-...:, GAS ovl I 11 I 11. 7‘45614000‘1881Pri 15188,110.... *Orem-. 4P ^-) 16446*110.0-!5.*°.0.0461..•"4'0 VA"'641"1- . ...!.,. TUBING 4.35 " 4 3451,483.5551,483.575 ts 365 ' 41. . ! 51/3.1 ¶1 PO .1-55 _,,rlt.if'-^“ _ -Te -.'.- o Dic4IN . ; ; It MAN Top MO I ,,,..-,, .,,„.„. if ir . ; 96 5 31 5-1-0 01 HANGER MCEVOY GEr0115,TUBING PLANER 1 , , . 1-77943 4t--1 119 6' 43.15:SAFETY VW C..4151e0 TROP4A-SSP.....,519,V ! , 3,973.7 2/SE 5 66- 4 X0 Reducol -.1tEK.ISS0v0F1 4 4 3 5 'gra-- 8i.VE A 4,76M, 3 312: -a 530' 11,334.3 59333 64 41*P6R SAKER 80-40 P911 , -11,486 6 5.136.5! 64 4 i-F,ACKER BAKER KB Aft1544EVABLE PACKER -2 tal II ......... _.. .,. .., ._ 1 1 1,A-24 31 8845 2 64.4 HYDRO INIP ELAikER 6400511411,0640-'rRip pRES5L4P6.51.:5-40 2 312"EFC416 2 SHIFTING:K/-/76'rAF8El?SHIFTING 11,456.3 t 54159 1' 9441 14 APL5 CAIACO 73 , tL,- - .'6° 1.11,41-7 91 5,859 fi. SI 41Ie,_,_EsHGE 2 91±,27 I 0%104 GA9I Br ir 1 f7.7-;'7.'•:1±.;:.„,1; . retrievable pluipti valves,pumps,fish,etc10 ,) ?op NW. 1 rop lwer, i li_4_98800. . C.,....,-.e. 1 4r.,a MOM 10 4410 i E '1236.70 0 248.1 64 41401614 I 1/2-93+450.4 41K Letch C,..."14.8 .!...'16.;4:x4 I ":".C,C..C... I i':::.'...7:...7:;':',iiNft-7t.".k:-,,,.. :,.___.,....-:...,J--:.:-..ii-tii:',:lic#91-ii4iliedf ,-1!kt:j‘,.. ..Vi: I a...A 0,1" ...Z.808__ c ir t :Tv frill*BM oveti 1.; ire,5_n_il isr,mg.), ism 911(9) ! Z... 1 0.08 0.-!. 1'4867 CI 11,877 01- 6,0341 6.0468C-4 1L-29 1112.241958 8-9'3.APF alf 2',91 E.),17v 0 9:90 9645,r12..")3K ! - °"31:-.144T------- IF : , --• , IC.; Il 11977.0i 51,5970 6.040 51 6,045 110-4.11-21 7101915 413APE RF 2 her 44!:„OP: 1800e4g Mason.90 , I leg°rent 11,117.0 11110.0 6645 11, 6,0550 -1 1'C .11,29 2101092 f,G1APERF 2l,r 1:105 r:re.. S4/A5 Ph 4 1 12,1740, 12.2130 6,169 0: 6 195 944-5 1L-i3 "609410'21 6 0!PERE I 3ir CIA G,..ro.61344'0 P1' FIA 11-1111 4 '--iii:i013; 12,330.0 0-2.32 1'. 0.235 4'4 4 1 L7f. -Z9 ..7 9,19!;I £04'PER --‘I ' ' T'04,, ,3 ,r 50 99.9 9A ,00.0,4440. 44.47,7_111,41 I . It. ''''''..lif!.;..,:,-,::' L____044 tiir21,1397 "-NOTE FiA44":A,v61 HtiS i4-',1P Pv_r 41:14eleng Elerneerl Leh rn 14510 W.,9 5'-C.,-,04-8, 74/1958 tiOTE 8:4.0,9 Plug wb 44:1 Pass INV SOT swta @ 1 T124"la D i 404 _,....._ NIPPLE!I,8811 fir 312611211,20 NOTE 1018111444,1013 CHANGED 0 k014 11.-20X TO I1,-29 , -.... ."7: I 44.4144,44. __ .- -4 10.50010 NOTE trcew Sthemanc*1 4,u,s4.4 SONer-44.41 0 1_, . A /16 s,,+- s....lri.Vit.'41:4.4-10-Q iityvi,ekyrc.L. .,t ) 1 - ,, , -. , , ,»NA, tw, Q S.Si 3t2? • I ! , 1-112r--'-23,4f1,10,-)-ili/0._gi.ft.14P,t 4/77/1/4 -‘A.k.kktkA S.431ii, 4le4ACPc±101-C2 /774 Wieg 1 I SQ A- 3'h''S76.3 e74.5 e//q ,1,e4-7 704441'") I I .1411E1111 11 011.1111.7 .4044 5 -: Pt' , '''' 1117/4' ,0 ror 0 4 s / k ex?' _..„ , " , -././ .... c_.4 te - .e.,,de.c i9 ac„,6 e,i .,,,, i-v‘tosirs, /7 7/5720 ./P 6,,,,,,,,,"e 6,, /5' •0.:-..t.-4.6.ez,--- 1.,---v-) - P".."',r5c_F , I , ,fillantlyel Details _ ,Top Orr. reP trfigtr _ i,44,4 5.- .; 441V1.4.1 lire CO , 'ow. 1.44414;UV. 410 A.. I 17 1,4 4',..._;” 'h.Tvinote.)1 {6481 , xi, MO o lilouai : g.6. 11111T9*,J12.1 ' 111.1 R...n 0 1. II1 tOEW __.- - .. , I 2,119,91 1,917.3119 43ICAMC0,1.1144G- /VAS LI 4'1 GLV 1614.2 0 125 1,2320 51294200 12.02,417.144 i 2 4,0070-4200,544 74T4491 7-44040 ICGAS LIFT,GIV 8K2-70 1 Bs 115,5-0-9T29rAP29 , 1 3 s8031 3,402.4j66ol iAMH Ft,41.40 ''''' 1.Thr..-4-7-51.-IFT 9,V99625%2 ;0 188 1,28543 54282009-7 , 9I 1.187----- -4 rit---.913.88 3 662.3'63 SWAM F191#40 11GAS LI T'Ov 83KZ 104.§31-T9---- --1: --- I * * 1,, ----1---i .... I \ \ \.41 -7,7575i 4,410 4167 29 144411,1 IF184407 I 1 rGAS LIFT!COY BK2 101000 W-612612On 1- ' \ 6, 9,095.;;F4276:-i 1:EA.90-11.1M1-1 1.0$4HO ^ 11GAS Lori fliklY -5042 '0 000, 0013118(2005 . , 1 1/10,39S 5.406 6t6,4 73:54,0,1 1,FAIMO---1, 11GAS Urriti4Y -1',Eil 10 WO i 001111991 ik 4 , _,. . . ....- _. '1 6,606 4,64 42 MACCO,SPU-2 1.4-11'14W410( 4144-- 10 ON rillIa5424,r1 1 i i 19"'10 I .... ' of' \..), I ' • GING /TUBING / LINER DEIIOL DRILL SITE //--oZ-DX I ARCO Alaska, Inc. * Subsidiary of AtionlicnichfloldCompany DATE Page 4*/ / of .o. pages ,-- #ITEMS COMPLETE DISCRIPTION OF EQUIPMENT RUN LENGTH DEPTH I 't,41?.,) 4Yo , ,,'itizr.7F1x,,,y.7e,, .,, ,,,..c.,,,,7, 7%,,,/, 3,y.SO i Do•Do al'•c:9 8 ! 3 e•5 i,i-1. le; 1lt7f, -/-z-lif_ 1,55 /71 7c. ZPr T4; . ,,?0,,RST I ii".`---'ic 4". 0 4/7- fiv s-6'5 Z2r 4.7,7o<tt.(Pf'-fr 173 ' 7-Ws'. 44 - ex gz„,,e, 244..17 7/.Cc._.3 Z,FeCS,i fli,p' _II - he" - .Vc. .41,64v-f-• 7,71. /94/,_{,_>3 I -&fe.•(, ..779.9,2-44i51 6,1"e,,D iivp -1-1, - 4('' " '-'"?,, , _ I ' ...0 a 8 /r—4 . --,e255-6/Tr -4'.. "/ "(./e--g'Ild 1,76.,Prlo.1. g.58 'i9 7312 4 I I/4'c/AV (7.:(FAO/6/, '01 0 7, - /./1" /9.6 a v .e.- i'. .5" I J*4 -1V 17v*/-ly :' - - •(/if"xt/ -/15-Ts:v4f-d''17,,0140'. 6 ,CZI.,5.'3 7 35'4 37 2-71.5. 3 '" 7-0 . - ,1'5" /94o v e- /136.2.5 '13 76.86 ., ,,, ,/iie/oft.,,r).- 3-:?,,,,r1/ - 6..ifrof e5.- -,,,,,..t iir love 4,79 I ,17.4 4-7:15-, A-'r 71j Y - /15 ,47.,•56 .,•e_ - , /.1.37.67 ..ie..5'7 9.SS (it/14 vry ..,,,. .-,/,- — 6.,,,,,,-, .ad, — ..e e- ,•7S .77 .7.,5 2.• .13 --R-5.13 " 76/0• . - /7.5- A1.6_,c2_/ e- -1..?c. I & ,,,,,_.1, P '_/___....._2z:_ 7 .1z3Ve .... _ejo y.._ 6'.4'S 1,909,5-'13 3%,... / I /eciffave 3,!, ,i.7 — /,-,y.eiz — "it5/44;r-e--- 30M, t...T,.k n . - ,/(. .V..5 t/e,.`-:,-. 9Y..?',.c. - ,,i t 5 4 e_.. ,: I ,z?thr c c-0 .1A//4-',5:(3-N-2 '-iii,c,/ctni-,""ift 4/s..f •5_14.. ,'' H a.8 514/i 3 2Sz..?/ - /-731. 5 " T . I Pup ...17, - ? ,2- - Az s 9 . // S) // P'4'2 '' BOTTOM OF TUBING TAIL 7,C -17 _ Remarks I _ I _ AACQ PI,.8 QUALITY LITHO,,,,,,NC. AN,..CFIAGE R SuDervisor I I I I IING /TUBI'NG / LINER DE$L DRILL SITE /Z. -,ZD X I ARCO Alaska, Inc. �>, DATE ��o/9/ Subsidiary of AtlanlicPichllHdCompany Page Z• of L pages #ITEMS COMPLETE DISCRIPTION OF EQUIPMENT RUN LENGTH_1 DEPTH 0 D7�'�tpi°2 ?, S,/.25•'ri1J O 23A-471 /O rIl,,,te Z ? '7 ,& TSOT N8' 74/-,�e) j -7,r9 ‘J'kP o 4 Rc•A / S.() II L/ 0/..5 9 ,QDI epole%`E�il a-fR,7,rtPs.3.--„,,i .0f sok• r :51,-11,,4• f 4�,i_,7 ,, r > , e. 3c0sS'11//___,,z3:,.73 I C/rreco _AO ,t///y/e, /e. /er.._7S-o ,c,c<<,roErre_ I i _fl/44 6-6,21_ a . T 6 & Ta ,•/ a - __V..L L.1 s I I I _r_ 1 I II __________J BOTTOM OF TUBING TAIL Remarks .Slr,•,v y0. T /OD Ai, 4,38k- 4,ese_i__11.4 ritIPZ___rL ,_,{// d,1y___Aa62 3 a s.s, 4)4, I ,Qt, } h// 3�- ,4_62 rr . aQ t.y/a.*GO" .)s A.c. .9,1.4.4.'./__.Q f-ali_`f_7 , ccry, 4'Q,•,/.. .uFXcc . £✓ w`I,331 'J5sbr )Pd� _1)r/--,f, .cam .SSsr __.?•.9o_"L/dr,/f - A.fd,J 9 ' //r T-5:r p cN7��P�.�-� d� y-,2uOtoti..: ":.3 ,'9.3"� as 6us- d V. ,4 °�'.3e4361,7/- /pa Al y ,w/1s -/,'Ve " :p /fir bra.) 54.1.1.-,./ r'o elf 7801 ID ARCO PM 118 P NTING—ANC4p PA13F - - - QUALITY LI'H'_l> Su^e•vi,or I I I . XHVZE Pages NOT Scanned in this Well History File This page identifies those items that were not scanned during the initial scanning project. They are available in the original file and viewable by direct inspection. ?/-~ i~ / File Number of Well History File PAGES TO DELETE Complete RESCAN Color items - Pages: GrayScale, halftones, pictures, graphs, charts- Pages: Poor Quality Original - Pages: Other- Pages: DIGITAL DATA [] Diskettes, No. [] Other, No/Type OVERSIZED .~- Logs-of various kinds . Other COMMENTS' Scanned by: Dianna Vincent Nathan Lowell [] TO RE-SCAN Notes: - Re-Scanned by: Bevedy Dianna Vincent Nathan Lowell Date: is~ og ggFo 0 l O qE gER 7.00 E ARCO Als ', Inc. Kuparuk Operations Post Office Box 196105 Anchorage, Alaska 99519-6105 Eric L. Zuspan Wells Engineering Tech Kuparuk Wells Group NSK-69 Phone: 659-7285 Fax: 659-7314 March 26, 2000 Mr. Steve McMains Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Steve, As discussed in your phone conversation with Bill Lloyd, ARCO Alaska, Inc. requests that the well name 1L-20X PTD 91-0051(API 50-029-22157-00) be changed to 1L-29. Currently there is a well 1L-20 (APl 50-029-22027-00) that we are sidetracking, permited as well 1L-20A. Operationally this could cause confusion during wellwork and facility operations between the wells 1L-20X and 1L-20A. If you would like to discuss this matter further please don't hesitate to call. Sincerely, 'X--" "~.?/;:/ :..' Eric L. Zuspan ARCO Alaska. Inc. is a Subsidiary of Atlantic Richfield Company STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation Shutdown _ Stimulate~ Plugging _ Perforate _X Pull tubing _ Alter casing _ Repair well _ Other _ 2. Name of Operator: 5. Type of Well: 6. Datum of elevation (DF or KB feet): ARCO Alaska, Inc. Development X. 130' RKB 3. Address: Exploratory_~. 7. Unit or Property: P.O. Box 100360 Stratagrapic__ Anchorage. AK 99510-0360 Service ~ Kuparuk River Unit 4. Location of well at surface: 8. Well number: 75' FSL, 216' FWL, Sec 29, T11 N, R10E, UM 1L-20X At top of productive interval: 9. Permit number/approval number: 1524' FSL, 992' FEL, Sec 28, T11N, R10E, UM 91-51 At effective depth: 10. APl number: 1580' FSL, 428' FEL, Sec 28, T11N, R10E, UM 50-029-22157-00 At total depth: 11. Field/Pool: 1673' FSL, 351' FEL, Sec 28, T11N, R10E, UM Kuparuk River Field / Oil Pool 12. Present well condition i~ummary Total Depth: measured 12532 feet Plugs (measured) None true vertical 6321 feet Effective Deptt measured 12444 feet Junk (measured) 1.5" DV in rathole true vertical 6283 feet Casing Length Size Cemented Measured depth True vertical depth Conductor 80' 16" 245 Sx AS I 122' 122' Surface 6010' 9.625" 800 Sx Type E & 6045' 3697' 630 Sx Class G Production 11733' 7" 300 Sx Class G 11768' 5991' Liner 1059' 5" 125 Sx Premium 12522' 6317' Perforation Depth measured 11867'-11910', 12174'-12213', 12320'-12330' true vertical 6036'-6055', 6169'-6186', 6232'-6236' ~"'-*i r*") r'--' I !% I Tubing (size, grade, and measured depth) 4", 11 Ib/ft, J-55 @ 3974' & 3.5", 9.3 Ib/ft, J-55 @ 3974'-11489' Packers and SSSV (type and measured depth) .... Pkr: Baker HB @ 11409'; SSSV: Camco TRDP-4A-SSA @ 1949' ~:~ ~ ¢'~ ~ .... ~ '~-~' 13. Stimulation or cement squeeze summary Perforated 'C' sands on 7/22/98. f0U Intervals treated (measured) 11867'-11877' Treatment description including volumes used and final pressure ~&¢¢~,3_ 0il ~- Perforated using 2-1/8" EJ guns w/DP charges @ 4 spt, final pressure was 1300 psi. 14. Representitive Daily Average Production or Injection Data OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation 1121 1143 2962 1294 193 Subsequent to operation 1345 1446 3390 1323 196 15. Attachments 16. Status'of well classification as: Copies of Logs and Surveys run _ Daily Report of Well Operations _X Oil _X Gas Suspended Service _ 17. I hereb~¢,certify that the foregoing is true and correct to the best of my knowledge. Signed ~ ~ ~-------~'-- Title'. Production Engineering Supervisor Date Form 10-404 Rev~]6'/1'~/88 SUBMIT IN DUPLIcA:I'~' ., Alaska, Inc. -~.. .... KUPARUK RIVER UNIT ~, . ~LL SERVICE REPORT ~ KI(L-20X(W4-6)) WELL JOB SCOPE JOB NUMBER 1L-20X PERFORATE, PERF SUPPORT 0608980938.9 DATE DAILY WORK UNIT NUMBER 07/22/98 FINISH PERFORATING C-4 SANDS 8305 DAY OPERATION COMPLETE I SUCCESSFUL KEY PERSON SUPERVISOR 4 (~) Yes (~') No! (~ Yes ~ No SWS-STEPHENSON JONES. ,~'~ FIELD AFC# CC# DAILY COST ACCUM COST Sign~/~,/" ~ ~ .~' .,,J('~.. ESTIMATE KAWWRK 230DS10LL $14,873 $45,156 ( ~~,~--~",~' Initial Tbg Press Final Tbg Press Initial Inner Ann Final Inner Ann I Initial Outer Anh I Final Outer-Ann-- 250 PSI 1300 PSI 1250 PSI 1350 PSII 780 PSI I 100 PSI DAILY SUMMARY ISWS RAN & PERFED C'4 SANDS FROM 11'867' TO 11'877' WITH 2'125'' EJ' DP' 4 SPF' 0 DEG PHASED & ORIENTDOWN. FLOWED WELL PRIOR TO PERFORATING. [Perf] I TIME LOG ENTRY 07:00 SWS & LRS MIRU, HELD TGSM. REHEAD LINE & SECURED RADIO SILENCE. SHUT IN WELL & LIFT GAS @ 9:00AM. 09:00 MU & ARM GUN. PT LUB TO 3000#. 09:30 MIH W/10' - 2.125" ENERJET, DP, 4 SPF, 0 DEG PHASED, ORIENT DOWN, MPD, 2 3/4" ROLLERS, CCL. CORR TO SWS CBT LOG 6-28-91 & PUT ON DEPTH. 10:45 PULL GUN ABOVE PERFS. FLOW WELL TO 400 PSI'TBG PRESS & SHUT IN. 12:00 CORR TO ABOVE LOG & PERF FROM 11,867' TO 11,877'. POH. 13:15 LD GUN, ALL SHOT FIRED. 13:30 RETURNED WELL TO PRODUCTION. RIG DOWN. 14:00 RELEASE SWS. SERVICE COMPANY - SERVICE DAILY COST ACCUM TOTAL $o.oo $500.00 APC $0.00 $1,000.00 ARCO $0.00 $500.00 HALLIBURTON $0.00 $2,230.00 LITTLE RED $1~430.00 $5,250.00 SCH LUM BERG ER $13~443.00 $35,676.76 TOTAL FIELD ESTIMATE $14.,873.00 $45,156.76 ARCO Alaska, Inc. ?-_.?~ O'i'fice ~,o:~ ~iO03{SO _'<!-~ ~ho~-'a[ie; Aiaska 99510-0860 April 6, 1992 Mr. David W. Johnston, Chairman Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Dear Mr. Johnston: Attached in duplicate are multiple Report of Sundry Well Operations (Form 10-404) notices in the Kuparuk field. The wells are listed below. WELL ACTION WELL ACTION 1L-20X Perforate 1 L-21 Perforate 1 L-25 Perforate If you have any questions, please call me at 263-4281. Sincerely, G. W. Strickland Operations Engineer cc: J.D. Bolling ATO-1196 KOE1.4-9 (w/o attachments)~ (w/o attachments) RECEIV D APR - 9 Alaska Oil & Gas Cons, Com~SS',o~- Anchorage ,'d:~CO ?,.laska, inc. is a Subsidiary of /,'1 aFdicR chfioI,;O(.ri :.p:-, .' STATE OF ALASKA ALASKA OILAND GAS CONSERVATION COMMISb~ON REPORT OF SUNDRY WELL OPERATIONS Stimulate __ Plugging Repair well 0R!G!N A 1. Operations Performed: Operation Shutdown . Pull tubing Alter casing 2. Name of Operator ARCO Alaska, Inc. 3. Address 5. Type of Well: Development X, Exploratory _ Stratigraphic _ Service P. O. Box 100360, Anchorage, AK 99510 4. Location of well at surface 75' FSL, 216' FWL, Sec. 29, T11N, R10E, UM At top of productive interval 1524' FSL, 992' FEL, Sec. 28, T11N, R10E, UM At effective depth 1580' FSL, 428' FEL, Sec. 28, T11N, R10E, UM At total depth 1673' FSL, 351' FEL, Sec. 28, T11N, R10E, UM 1 2532' feet Plugs (measured) 6321 ' feet Perforate X_.. Other 6. Datum elevation (DF or KB) 170' RKB 7. Unit or Property name Kuparuk River Unit feet 12. Present well condition summary Total Depth: measured true vertical measured 1 2444' feet true vertical 6283' feet 8. Well number 1L-20X 9. Permit number/approval number 91-51 10. APl number 50-02~)-22157 11. Field/Pool Kuparuk River Oil Pool Effective depth: Junk (measured) 12176' WLM Length Size Cemented Measured depth 122' 1 6045' 9 6" 245 Sx AS I 1 2 2' 5/8" 800 Sx Type E & 6 0 4 5' 630 Sx Class G Tail " 300 Sx Class G 1 1 7 6 8' " 125 Sx Premium 12522' 0',12174'-12213',12320'-12330' I 1 768' 7 1059' 5 measured 1 1887'-1 191 true vertical Casing Structural Conductor Surface Intermediate Production Liner Perforation depth: True vertical depth 122' 3697' 5991' 6317' RECEIVED Aiaska Oil .& Gas Cons. g~chorage 6043'-6052',6167'-6183',6229'-6233' Tubing Pressure Tubing (size, grade, and measured depth) 4" 11#, J-55, 3974', & 3 1/2" 9.3#, J-55, 3974' TO 11489' Packers and SSSV (type and measured depth) SSSV: Camco TRDP-4A-SSA, 1949', Packer: Baker HB, 11409' 13. Stimulation or cement squeeze summary Perforated "C" Sand @ 6 SPF Intervals treated (measured) 11887'-1 1910' Treatment description including volumes used and final pressure N/A 114. Representative Daily Average P~oduction or Injection Data Oil~Bbl Gas-Md Water-Bbl Casing Pressure 35O 500 Prior to well operation Subsequent to operation 260 700 5 1400 .. 1260~' 20600 . 13 1400 Service 15. Attachments Copies of Logs and Surveys run Daily Report of Well Operations, X, 16. Status of well classification as: Water Injector ~ Oil X__ Gas Suspended 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. SUBMIT IN DUPLICATE Si~ned Form 10-404 Rev 09/12/90 ., CO Alaska, Inc. WELL ~I=HVIL;I:: .,, Subsidiary of Atlantic Richfield Comp~, . ~ CONTRAC~OR . IoPERATION AT REPORT TIME , , c ,, ' iDATE 2-,,',/-~X ©600 -/-/L,5' o,q LOOh7~e,,~ } ~/¢ up. 4l~s~.O!!.~ Oas Cans. O '7~.~ - lq ~ Z o ~. ~ 6 cc~ ~5 T. 1505'- /--/u,uG u£ (D. i/,~/5'' d~"Tmov~ '-['~oZ5 ~P 0£ - j I ~/ 00 - I~,lO- 7~GH~uED_~P 7~E6 Co~J~JddTTox/ "C"~ffn~'8 ~3e~m Q3'/~,'?~v,4z. //857'-- HE/O' &,SPF O°k~n,,, ,__ ARCO Alaska, Inc. Date: August 16, 1991 Transmittal Ct: 81 97 RETURN TO: ARCO Alaska, Inc. Attn: Maria Trevithick Kuparuk Operations File Clerk ATO-1119 P.O. Box 100360 Anchorage, AK 9951 0-0360 Transmitted here with are the following Open hole items. and return one signed copy of this transmittal. --"1L-20X C[~ 4/1 7-1 9/91 ~/ C~,~ ~1R'24 CDR 7/30-8/5-91 - 1R 24 C[~ 7/30-8/5-91 Receipt Acknowledged: Please acknowledge receipt 6044-11757 6753-12972 6753-12972 Date: :'- ........ DISTRIBUTION: D&M Drilling Franzen Vendor Package(Johnston) NSK State of Alaska(+Sepia) ALA,...,, OIL AND GAS CONSERVATION COMk _ SION WELL COMPLETION OR RI=COMPLETION REPORT AND LOG I Status of Wetl OIL ~] GAS ~ SUSPENDED [~] ABANDONED r'-] SERVICE Classification of Service Well 2 Name of Operator ARCO Alaska, Inc 3 Address P.O. Box 100360, Anchorage, AK 99510-0360 4 Location of well at surface 75' FSL, 216' FWL, SEC 29, T11N, R10E, UM 1524' FSL, 992' FEL, SEC 28, T11N,R10E,UM 1673' FSL, 351' FEL, SEC 28, T11 N, R10E, UM 5 Elevation in feet (indicate KB, DF, etc.) 6 Lease Designation and SeriaJ No. RKB 130', PAD 88' GL ADL 25660, ALK 470 12 Date Spudded 13 Date T.D. Reached 4/11/91. 4/26/91. 17 Total Depth (MD+TVD) 18 Plug Back Depth (MD+TVD) 12,532' MD, 6321' TVD 12,444,' M D, 6283' 'i'VD 22 Type Electdc or Other Logs Run DIL/SFL, CDN,CDR,GR,CET, CBL,GCT [23 Date Comp., Susp. o~' Abartd. Directional Survey 7 Permit Number 91-51 8 APl Number 50-029-22157 9 Unitor Lease Name KUPARUK RIVER 0 Well Number 1 L-20X 1 Field and Pool KUPARUK RIVER FIELD KUPARUK RIVER OIL POOL 15 Water Depth, if offshore J16 No. of Completions NA feet MSL~ 1 20 Depth where SSSV set 21 Thickness of permafrost 1949' feet MD 1500' APPROX CASING, LINER AND CEMENTING RECORD CASING SIZE WT. PER FT. SETTING DEPTH MD GRAD~ H-40 J-55 J-55 L-80 TOP 16" 62.5# SURF 9-5/8" 36# SURF 7" 26# SURF 5" 18# 11,463' 24 Perforations o :)en to Production (MD+TVD of Top and Bottom and interval, size and number) HOLE SIZE 122' 24" 6045' 12-1/4" 8-1/2" 12,174' -12,213' W/3-3/8" WL @ 6SPF MD, 6167'-6183' TVD 12,320'-12,330' W/3-3/8" WL @ 6SPF MD, 6229'-6233' TVD 11,768' 12,522' 6" CEMENTING RE~D AMOUNT PUli FO 245 SX ASI 825 SX TYPE E, 630 SX CLASS G 300 SX CLASS G 25 SX PREMIUM CMT. 25 TUBING RECORD SIZE DEPTH SET (MD) PACKER SET (MD) 4", 3-1/2" 12,489' 11,409' 26 ACID, FRACTURE, CEMENT SQUEEZE, ETC DEPTH INTERVAL (MD) AMOUNT & KIND Of MATERIAL USED 27 date First Production Date of Test PRCOUCTION TEST IMethod of Operation (Flowing, gas lift, etc.) Brief description of lithology, porosity, fractures, ap~ere~t dips and i~esence of o41, gas or water. Subrni~c~re~chips. Form 10-407 Submit in duplicate Rev. 7-1-80 CO{qT] NI..~D Oiq REVERSE SIDE GEOLOGIC MARKERS FORMATION TESTS . NAN~ Include interval tested, pressure data, all fluids recoverd and gravity, --. MEAS. DEPTH TRUE VERT. DEPTH GOR, and time of each phase. KUPARUK C TOP 11,80Z 6006' NA KUPARUK C Be'FI'OM 11,910' 6052' KUPARUK A TOP 12,144' 6154' KUPARUK A Be'FI'OM 12,337 6236' 31. LIST OF ATTACHMENTS GRYO, & REPORT OF OPERATIONS 32. I hereby certify that the foregoing is true and correct to the best of my knowledge Signe Title AJ=IEA DRILLIN~ ENGINEER Date INSTRUCTIONS General' This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Item 1' Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1 6, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pedinent to such interval. Item 21' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). Item 23: Attached supplemental records for this well should show the details of any multiple stage cement- ing and the location of the cementing tool. Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In- jection, Gas Injection, Shut-in, Other-explain. Item 28: If no cores taken, indicate "none". Form 10-407 ADDENDUM WELL: 8/4/91 follows: 1 L-20X Frac KRU "A" sand peals from 12174'-12213', 12320'-12330'@ ~spf in 10 stages as *Stage 1. Pmp 200 bbls YF240D XL GW @ 25 bpm 7741-5795 psi Stage 2 Pmp124 bbls YF240D XL GW @ 25 bpm 5795-4646 psi ISIP: 2000 FRACGRAD: 76 PERF FRIC: 38 Stage 3 Pmp 700 bbls YF240D XL GW @ 25 bpm 4850-5109 psi Stage 4 Prop150 bbls YF240D XL GW w/2ppg 20/40 Carbolite @ 25 bpm 5109- 4724 ps~ Stage 5 Pmp125 bbls YF240D XL GW w/4ppg 20/40 Carbolite@ 25 bpm 4724- 4637 ps~ Stage 6 Pmp 100 bbls YF240D XL GW w/6ppg 16/20 Carbolite @ 25 bpm 4637- 4719ps~ Stage 7 Pmp 75 bbls YF240D XL GW w/8ppg 16/20 Carbolite @ 25 bpm 4719- 5173 ps~ Stage 8 Pmp 50 bbls YF240D XL GW w/10ppg 16/20 Carbolite @ 25 bpm 5173- 5635 ps~ Stage 9 Pmp 28 bbls YF240D XL GW w/12ppg 16/20 Carbolite @ 25 bpm 5635- 5700 ps~ **Stage 10 Pmp 30 bbls YF240D Non XL GW @ 25-22-20 bpm 4600 psi Pmp 46 bbls Slick Diesel Flush 8900 psi * Started job @ 1300 - pumped 200 bbls and tree saver cups failed R/D and replaced cups ** Cut rate but screened out 46 bbls short 10# sand @ perfs Average Pressure: 5,500 psi Fluid to recover: 1,500 Sand in zone: 73,600 # Sand in casing: 13,764 Drilling S u(~i n~~ Date / ARCO ALASKA iNC. DAILY OPERATIONS PAGE: WELL: 1L-20X BOROUGH: NORTH SLOPE UNIT: KUPARUK RIVER UNIT LEASE: ADL 25660 ALK 470 API: 50-029-22157 PERMIT 91-51 APPROVAL: AFE: AK6012 WI: 55.252072 SPUD: 04/12/91 08:00 RELEASE: 05/03/91 04:00 OPERATION: DRILLING RIG: POOL 7 04/12/91 ( 1) TD: 80'( 80) SUPV:JRR 04/13/91 ( 2) TD: 1810' ( 1730) SUPV:JRR 04/14/91 ( 3) TD: 4341' (2531) SUPV:JRR 04/15/91 ( 4) TD: 5496' (1155) SUPV:JRR 04/16/91 ( 5) TD: 6070'( 574) SUPV:JRR 04/17/91 ( 6) TD: 5964'( SUPV:JRR 0) 04/18/91 ( 7) TD: 8202' (2238) SUPV:CTD 04/19/91 ( 8) TD:10990' (2788) SUPV:CTD POOL 7 PU BHA PREP TO SPUD MW: 0.0 VIS: 0 MOVE POOL 7 AROUND THE CORNER FROM 1L-17 TO 1L-20X. SKID RIG OVER WELL. RU ELEC, STEAM, WATER AND AIR. NU DIVERTER AND MODIFY RISER TO FIT NEW CONDUCTOR HEIGHT (STANDARD HEIGHT HAS CHANGED AT THE REQUEST OF FACILITIES DEPARTMENT). RU DIV LINES AND FUNCTION TEST DIVERTER. PU BHA AND PREP TO SPUD. DAILY:S52,639 CUM:$52,639 ETD:S52,639 EFC:$2,500,000 DRILLING MW:10.8 VIS: 44 PU AND ORIENT BHA. DRLG F/122'-1482' CIRC OUT GAS CUT MUD. DRLD F/1482- 1578' CIRC TO RAISE MW F/10.0 TO 10.4 (9.2 PPG GAS CUT MUD OUT). DRLD F/1578-1665' ATTEMPT TO OBTAIN MWD SURVEY. ANADRIL NOT WORKING. CIRC OUT GAS CUT MUD. WT UP TO 10.8 PPG. POH. CHANGE BHA AND PU NEW MWD TOOL. TIH. DRLD TO 1810' · DAILY:S82,708 CUM:$135,347 ETD:S135,347 EFC:$2,500,000 TIH MW:10.7 VIS: 41 DRLD F/1810-4341'. SHORT TRIP TO HWDP. HOLE TIGHT. TIH, REAM TIGHT SPOT AT 2700'. DAILY:S53,882 CUM:$189,229 ETD:S189,229 EFC:$2,500,000 DRILLING MW:10.8 VIS: 45 FINISH TIH. DRLD F/4341-4611' DYNADRILL QUIT. CIRC HOLE CLEAN. TOH. CHANGE MUD MOTOR AND BIT, ORIENT TOOLS, SERVICE RIG. TIH. DRLD F/4611-5496'. DAILY:S47,519 CUM:$236,748 ETD:S236,748 EFC:$2,500,000 RUNNING 9-5/8" CSG MW:10.8 VIS: 52 DRLD F/5496-6070' CIRC BU. SHORT TO HWDP. TIGHT @ 3879' CIRC AND COND MU~. TOH AND LD BHA. RU CASING CREW. RUN 88 JTS 9-5/8" CSG. (TOTAL TO RUN IS 147 JTS). DAILY:S48,049 CUM:$284,797 ETD:S284,797 EFC:$2,500,000 PU 8-1/2" BHA 9-5/8"@ 6044' MW: 0.0 VIS: 0 FINISH RUNNING 9-5/8" 36# J-55 BTC CSG, FC @ 5964', FS @ 6045', CIRC & COND MUD, CMT W/825 SX (285 BBLS) TYPE E CMT & 630 SX (129 BBLS) CLASS G TAIL CMT, BUMPED PLUG TO 2000 PSI CHECKED FLOATS-OK, CIP @ 13:15 ON 4/16/91, LD LNDG JT, PUMP 100 SX TYPE C PERMAFROST CMT FOR TOP JOB, GOOD RETURNS TO SURFACE, MU MCEVOY BRADENHEAD, NU BOPE & TST, INSTALL WEAR RING, CUT DRLG LINE, PU 8.5 BHA DAILY:S292,182 CUM:$576,979 ETD:S576,979 EFC:$2,500,000 DRILLING AT 8202 9-5/8"@ 6044' MW: 9.3 VIS: 35 PU BHA, TIH, TEST 9-5/8" CASING TO 2000 PSI, DRILL FLOAT SHOE AND 10' OF NEW FORMATION. TEST SHOE TO 12.5 PPG EMW, NO LEAK-OFF. DRILL FROM 6080' TO 8202. DAILY:S50,377 CUM:$627,356 ETD:S627,356 EFC:$2,500,000 DRLG 9-5/8"@ 6044' MW: 9.6 VIS: 39 DRILLED F/8202 -10990'. ADT 20 HR. DIRECTIONAL CORRECTIONS AS REQUIRED. DAILY:S52,017 CUM:$679,373 ETD:S679,373 EFC:$2,500,000 WELL: 1L-20X OPERATION: DRILLING RIG: POOL 7 PAGE: 2 04/20/91 ( 9) TD:11788' ( 798) SUPV:CTD 04/21/91 (10) TD:11788' ( SUPV:CTD o) 04/22/91 (11) TD:11788' ( SUPV:CTD o) 04/23/91 (12) TD:11788' ( SUPV:CTD o) 04/24/91 (13) TD:11788' ( SUPV:CTD o) 04/25/91 (14) TD:11972' ( 184) SUPV:JRR CIRC AND COND HOLE 9-5/8"@ 6044' MW:10.8 VIS: 43 DRLD F/10990-11788' (7" CSG POINT). EST DEPTH TO BE 15' ABOVE TOP OF KUPARUK. PUMP HI VIS SWEEP. INCR MW F/10.0-10.3 PPG DUE TO CONNECTION GAS. ATTEMPT SHORT TRIP, PULLED 7 STANDS, HOLE TIGHT AND NOT TAKING PROPER AMT OF MUD. INSTALL NEW SAVER SUB IN TOP DRIVE. REAM 11698 TO 11788'. CIRC OUT GAS CUT MUD. MW CUT 10.3 TO 9.8 PPG. INCR MW TO 10.6 PPG. CIRC. INCR MW TO 10.8 PPG. DAILY:S57,388 CUM:$736,761 ETD:S736,761 EFC:$2,500,000 RUNNING 7" CSG 7"@11788' MW:10.8 VIS: 46 SHORT TRIP TO 9-5/8" SHOE. CUT 60' OF DRLG LINE. RIH TO 11788' - NO TIGHT SPOTS. CBU. PUMP PILL AND TOH. LD MONEL DC, UNLOAD SOURCE, DOWN LOAD LWD INFO. LD LWD, TURBINE, AND BHA. PULL WEAR RING. RU TO RUN 7" CSG. RUNNING 7" CSG AT PRESENT. DAILY:S60,223 CUM:$796,984 ETD:S796,984 EFC:$2,500,000 NU BOP 7"@11788' MW:10.8 VIS: 39 RUN 7" 26 PPF J55 BTC CSG. BREAK CIRC @ 9-5/8" SHOE. FINISH RUNNING CSG. LOST COMPLETE RETURNS @ 10,500' APPROX. RU CMT HEAD AND PUMP 107 BBL WITH NO RETURNS. RU HALLIBURTON AND PUMP 3 BBL ARCO PREFLUSH AND TESTED LINES TO 4000 PSI. PUMPED ADDITIONAL 7 BBL ARCO PREFLUSH. PUMPED 35 BBL ARCO SPACER, MIXED AND PUMPED 300 SX CL G + LATEX ADDS. BUMPED PLUG, TO 3500 PSI. NO RETURNS DURING CMT JOB. FLOATS HELD. WOC 3 HOURS. ND STACK, SET SLIPS WITH 255,000 LB HANGING WEIGHT. CUT 7" AND INSTALL PACKOFF. NU 11" 3M X 7-1/16" 5M TBG SPOOL. TEST PACKOFF TO 3000 PSI. NU 7-1/16" X 13-5/8" ADAPTER. CHANGED RAMS TO 3-1/2". DAILY:S302,472 CUM:$1,099,456 ETD:S1,099,456 EFC:$2,500,000 PU BHA 7"@11788' MW:ll.6 VIS: 60 LD 5" DP OUT OF DERRICK. CHANGE TOP AND BOTTOM RAMS TO 3-1/2" CHANGE PIPE HANDLING EQUIP TO 3-1/2". LOAD PIPE SHED WITH 3-1/2" DP AND BHA. STRAP DP. PU TEST JT AND TEST PIPE RAMS, HYD AND MANUAL VALVES TO 500 AND 3000 PSI. HYDRIL WOULD NOT TEST. ND FLOWLINE AND BELL NIPPLE. CHANGE OUT HYDRIL RUBBER. NU FLOWLINE AND BELL NIPPLE. FINISH TESTING BLIND RAMS AND HYDRIL - OK. SET WEAR BUSHING. BEGIN PU BHA. DAILY:S69,484 CUM:$1,168,940 ETD:S1,168,940 EFC:$2,500,000 DRILLING 7"@11788' MW:ll.6 VIS: 50 PU 4-3/4" BHA. 'REPAIR LAYDOWN MACHINE. PU 3-1/2" DP AND TIH. BREAK CIRC AND DRILL CMT DOWN TO 11684' (TOP OF FC). CIRC OUT CONTAMINATED MUD. SLIP AND CUT DRILLING LINE. DRILL FC AND CEMENT. TEST CASING TO 3000 PSI - OK. DRILLED CMT AND FS AND 5' OF NEW HOLE. TEST FORMATION TO 13.5 PPG WITH NO LEAK OFF. DRILLING AT PRESENT. DAILY:S53,704 CUM:$1,222,644 ETD:S1,222,644 EFC:$2,500,000 DRILLING 7"@11788' MW:ll.6 VIS: 56 DRLD TO 11,802'. CIRC BOTTOMS UP. TOH FOR BIT. CHANGE BATTERY IN MWD, FUNCTION TEST DYNADRILL. PU BIT NO. 6. TIH TO 11685'. REMOVE SAVER SUB FROM TOP DRIVE (THREADS PINCHED). SERVICE TOP DRIVE. INSTALL NEW SAVER SUB. FINISH TIH. DRILLED FROM 11802-11972'. DAILY: $63,237 CUM: $1,285,881 ETD: $1, 285, 881~C~ I~,~0D AU G 1 9 991 Alaska Oil & Gas Cons. 'Anchorage WELL: 1L-20X OPERATION: DRILLING RIG: POOL ~ PAGE' 04/26/91 (15) TD:12315' ( 343) SUPV:JRR DRILLING 7"@11788' MW:ll.7 VIS: 60 DRLG F/11,972' - 12257'. CIRC. TFNB. DRILLED TO PD. DAILY:S52,803 CUM:$1,338,684 ETD:S1,338,684 EFC:$2,500,000 04/27/91 (16) TD:12532' ( 217) SUPV:JRR LD MWD, PREP TO LOG 7"@11788' MW:ll.6 VIS: 56 DRILL FROM 12315 TO 12532' TD. SHORT TRIP TO 7" CASING, TOH LD MWD/DYNADRILL DAILY:S46,195 CUM:$1,384,879 ETD:S1,384,879 EFC:$2,500,00 04/28/91 (17) TD:12532' ( SUPV:JRR o) RUN 5" LINER 7"@11788' MW:ll.8 VIS: 56 L/D DYNADRILL. R/U LOGGERS. RIH W/TRIPLE COMBO, COULD NOT GET BELOW 11,844' WLM, ABANDONED ATTEMPT TO OPEN HOLE LOG, LOGGED W/GR F/11,768'-1000'. R/D LOGGERS. TIH. CIRC AND CONDITION GAS CUT MUD. HOLE PACKING OFF-WORKED UNTIL CLEAN. TOH. R/U CSG EQUIPMENT. RUN 5" LINER. DAILY:S75,432 CUM:$1,460,311 ETD:S1,460,311 EFC:$2,500,000 04/29/91 (18) TD:12428' ( SUPV:JRR o) CIRC ON TOL 7"@11788' MW:ll.8 VIS: 53 FINISH RUNNING 23 JTS 5" 18# L-80 LTC 8 CSG PLUS ONE MARKER JT AND TIW 7"X5" HANGER. TIH W/CSG ON 3.5" DP. SLIP AND CUT DRILL LINE. CON'T TIH W/LINER. CIRC AT 7" CSG SHOE. FINISH TIH W/LINER. CIRC AND COND MUD. TEST LINES TO 4000 PSI, PUMP 10 BBL SPACER AT 11.8 PPG, PUMP 125 SX CLASS G CEMENT W/1 GPS LATEX 2000 + 3% CAL SEAL + 0.45% CFR-3 + 0.05 GPS D-AIR 3 + 0.1 GPS FD PC 4348 + 0.5% BENTONITE AT 15.6 PPG. DISPLACE W/93 BBL MUD. RECIPROCATED W/FULL RETURNS UNTIL LAST 4 BBL, PACKED OFF AND LOST RETURNS. BUMPED PLUG TO 3500 PSI. PULLED 10 STANDS DRILL PIPE, NO U-TUBE, NO CEMENT ON TOL. CIRC BTMS UP. PUMP DRY JOB. TOH. L/D LINER RUNNING TOOL. LUBRICATE RIG. L/D MONEL DC, P/U 6.125" BIT AND SCR. TIH. NO CEMENT ON TOL. CIRC BU. DAILY:S101,997 CUM:$1,562,308 ETD:S1,562,308 EFC:$2,500,000 04/30/91 (19) TD:12035' ( SUPV:JRR o) TIH W/4.125" MILL 7"@11788' MW:ll.8 VIS: 54 FINISH CIRC B/U. TEST LINER LAP 1500 PSI-OK. TOH. L/D BIT AND SCRAPER. P/U 3.125" DC. TIH W/4.125" TRISTATE 6-BLADED ~MILL. TAGGED CEMENT AT 12,026' . DRLD F/12,026' TO 12,035' TOH W/MILL. SLIP AND CUT DRILL LINE. FINISH TOH. CHANGED MILL TO TRISTATE 3 BLADE. DAILY:S48,511 CUM:$1,610,819 ETD:S1,610,819 EFC:$2,500,000 05/01/91 (20) TD:12444' ( 409) SUPV:JRR TOH 7"@11788' MW:ll.7 VIS: 60 TIH W/MILL. DRLD CEMENT F/12,035'-12,444'. TAGGED LANDING COLLAR. CIRC R/U AND REVERSE CIRC. TEST CSG AND LINER LAP TO 3000 PSI-OK.' TOH F/5" CSG SCRAPER. DAILY:S46,742 CUM:$1,657,561 ETD:S1,657,561 EFC:$2,500,000 05/02/91 (21) TD:12444' ( SUPV:KKL o) FILTERING BRINE 7"@11788' MW:ll.8 VIS: 0 POH WITH MILL. RIH WITH 4.75" DC AND HWDP. L/D 4.75" DC AND HWDP. RIH WITH BIT AND SCRAPER FOR FLUID CHANGEOVER. REVERSE CIRCULATE AND PUMPED 300 BBL FRESH WATER. FOLLOWED WATER WITH 11.8 PPG NACL/NABR. CIRCULATE AND FILTER BRINE. DAILY:S46,791 CUM:$1,704,352 ETD:S1,704,352 EFC:$2,500,000 05/03/91 (22) RELEASED RIG 7"@11788' MW:ll.8 VIS: 0 TD:12444' ( 0) CIRCULATED AND FILTERED NACL/NABR TO ARCO SPECS, PUMPED DRY SUPV:KKL JOB. POH AND LD 3.5" DP AND 3.125" DC. PULL WEAR RING. ND BOP. NU ADAPTER FLANGE AND 3" 5M VALVE. **RELEASED RIG @ 0400 5/3/91'* ..~ , DAILY: $170, 3~i CUM:$1,874,723 ETD:S1,874,723 EFC:$2,500,000 ARCO ALASKA iNC. DAILY OPERATIONS PAGE' WELL: BOROUGH: UNIT: LEASE: API: PERMIT APPROVAL: AFE: WI: 1L-20X NORTH SLOPE KUPARUK RIVER UNIT ADL 25660 ALK 470 50-029-22157 90-51 AK6012 55.252072 ACCEPT: 06/25/91 01:00 RELEASE: 07/21/91 21:00 OPERATION: DRILLING RIG: NORDIC 1 NORDIC 1 06/25/91 (23) TD:12444 PB:12473 SUPV:DB/WM PU 2-7/8" DRILL PIPE 7"@11788' MW:12.1 NaCl/Br ACCEPT RIG @ 0100 HRS 6-25-91. NU BOPE AND TEST. RACK AND TALLY 2-7/8" DP. PU 2-7/8" DP AND GIH. DAILY:S44,126 CUM:$~,918,849 ETD:S1,918,849 EFC:$2,500,000 06/26/91 (24) TD:12444 PB:12473 SUPV:DB/WM REVERSE CIRCULATING 7"@11788' MW:ll.8 NaC1/Br GIH W/ 4-1/8" BIT AND 5" CSG SCRAPER. CIRCULATE HOLE CLEAN @ TOL. PUMPED HI-VIS SWEEP. FGIH TO PBD, 12,441' REVERSE CIRCULATE AND PUMP HI-VIS SWEEP. FILTER AND BUILD BRINE VOLUME. DAILY:S79,268 CUM:$1,998,117 ETD:S1,998,117 EFC:$2,500,00 06/27/91 (25) TD:12444 PB:12473 SUPV:GB RU SWS FOR LOGGING 7"@11788' MW:ll.8 NaCl/Br CIRCULATE AND FILTER FLUID. POH TO TOL. CIRC ON TOL AND FILTER BRINE. FPOH. LD 2-7/8" DP. RU SWS TO ATTEMPT WL CASED HOLE LOGS. DAILY:S92,725 CUM:$2,090,842 ETD:S2,090,842 EFC:$2,500,000 06/28/91 (26) TD:12444 PB:12473 SUPV:GB LOGGING CBT 7"@11788' MW:ll.8 NaC1/Br ATT TO LOG GR-CCL-CBT-CET. NO GO. REMOVE 3 CENTRALIZERS. STILL NO GO. LOG WELL W/ GR-CCL-CNL. LOGGED GR-CCL-CET FROM BOTTOM OF 'C'SAND UP. LOG WELL W/ GR-CCL-HLDT. LOG WELL WL GR-CCL-CBT, (HAD TO CO CENTRALIZERS 1 TIME.) PREP TO GIH W/ GLT. DAILY:S28,147 CUM:$2,118,989 ETD:S2,118,989 EFC:$2,500,000 06/29/91 (27) TD:12444 PB:12473 SUPV:GB POH W/ PERF GUN 7"@11788' MW:ll.8 NaCl/Br MADE GR-GLT RUN. PERFORATED WELL WITH WIRELINE GUNS. DAILY:S35,783 CUM:$2,154,772 ETD:S2,154,772 EFC:$2,500,000 06/30/91 (28) TD:12444 PB:12473 SUPV:GB LOADING PIPE SHED W/ TBG 7"@11788' MW:ll.8 NaC1/Br FPOH W/ PERF GUN #3. RD SWS. GIH W/ 3-1/2" DP AND LD SAME. LD DC'S. LOAD PIPE SHED W/ TBG AND ACCESSORIES. · DAILY:S136,445 CUM:$2,291,217 ETD:S2,291,217 EFC:$2,500,000 07/01/91 (29) TD:12444 PB:12473 SUPV:GB GIH W/ SLICKLINE 7"@11788' MW:ll.8 NaCl/Br FINISHED LOADING PIPE SHED. RAN 4" X 3-1/2" COMPLETION ASS'Y. PUMP BALL DOWN TO SET PKR. HYDROTRIP SUB SHEARED EARLY. WO SLICKLINE UNIT. RU SLICKLINE AND GIH W/ PLUG. SET IN HYDROTRIP SUB AND FINISH SETTING PACKER. POH W/ PLUG. SHEARED PBR. GIH W/ SLICKLINE AND ATT TO PULL CV FROM GLM @ 11334' DAILY:$2~,147 CUM:$2,319,364 ETD:S2,319,364 EFC:$2,500,000 07/02/91 (30) RIG RELEASED 7"@11788' MW:ll.8 NaCl/Br TD:12444 REPLACED CV W/ DV IN LOWEST GLM. TEST PKR AND SSSV. PB:12473 REPLACED DV W/ CV. ND BOP'S AND NU TREE. TEST SAME. OK. SUPV:GB FREEZE PROTECT AND SECURE WELL. RR @ 2100 HRS, 7-1-91 FOR ANNUAL MAINTENANCE. ~ ~AILY:$26~067 CUM:$2,580,431 ETD:S2,580,431 EFC:$2,500,000 ORIGINAL SUB-SURFACE DIRECTIONAl. SURVEY r'~UIDANCE [~]ONTINUOUS ~IooL Company ARCO ALASKA, INC. Well Name 1L-20X (75' FSL,217' FWL, Field/Location KUPARUK, NORTH SLOPE, SEC 29, ALASKA TllN, RIOE) Job Reference No. 74588 Logged By.' FORMICA Date · 13-MAY-gl Computed By: DEES SCHLUMBERGER GCT DIRECTIONAL SURVEY CUSTOMER LISTING FOR ARCO ALASKA, INC. 1L-20X KUPARUK RIVER NORTH SLOPE, ALASKA SURVEY DATE: 13-MAY-gl ENGINEER: JEFF FORMICA METHODS OF COMPUTATION TOOL LOCATION: INTERPOLATION: VERTICAL SECTION: TANGENTIAL- LINEAR HORIZ. DIST. Averaged deviation and azimuth PROJECTED ONTO A TARGET AZIMUTH OF NORTH 81 DEG 21 MIN EAST COMPUTATION DATE: 29-MAY-91 PAGE 1 ARCO ALASKA, INC. 1L-20X KUPARUK RIVER NORTH SLOPE, ALASKA DATE OF SURVEY: 13-MAY-91 KELLY BUSHING ELEVATION: 130.00 FT ENGINEER: JEFF FORMICA INTERPOLATED VALUES FOR EVEN 100 FEET OF MEASURED DEPTH TRUE SUB-SEA COURSE MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH DEPTH DEPTH DEPTH DEG MIN DEG MIN VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUTH FEET DEG/IO0 FEET FEET FEET DEG MIN 0.00 100.00 200.00 300.00 400.00 500.00 600.00 700,00 800,00 900.00 0,00 -130 O0 0 0 100.00 -30 200.00 70 299.99 169 399.88 269 499.52 369 598.75 468 697.35 567 795.25 665 892.24 762 N 0 0 E O0 0 2 N 54 41 W O0 0 14 S 34 52 E 99 1 24 S 59 34 E 88 3 51 S 75 5 E 52 5 53 S 79 53 E 75 8 16 S 86 25 E 35 10 45 N 85 48 E 25 12 54 N 86 9 E 24 15 26 N 88 24 E 0.00 0.00 0.00 N -0.05 0.27 O. 12 N -0.02 0.23 0.06 S 0.64 2. 12 0,88 S 4.55 2.74 2.32 S 12.48 1,93 4.10 S 24.31 3,02 5,56 S 40.79 1.87 5.34 S 61.10 2.46 3.75 5 85.26 3.80 2.62 S 0.00 E 0.00 N 0 0 E 0.07 W 0.13 N 29 31 W 0.01 W 0.06 S 8 58 W 0,78 E 1.18 S 41 37 E 4.96 E 5.47 S 64 58 E 13.25 E 13.87 S 72 49 E 25.43 E 26.03 S 77 41 E 42.07 E 42.41 S 82 46 E 62.37 E 62.49 S 86 34 E 86.64 E 86.68 S 88 16 E 1000 O0 1100 1200 1300 1400 1500 1600 1700 1800 1900 987.90 857.90 18 4 N 88 10 E O0 1082.37 952.37 19 56 N 83 59 E O0 1175.69 1045.69 22 22 N 81 10 E O0 1267.24 1137.24 25 17 N 78 18 E O0 1356.70 1226.70 27 32 N 77 7 E O0 1444.12 1314.12 30 27 N 77 59 E O0 1529.48 1399.48 32 6 N 78 5 E O0 1613,02 1483.02 35 21 N 80 3 E O0 1691.57 1561.57 41 35 N 82 6 E O0 1763.79 1633.79 44 19 N 82 30 E 114.15 1.68 146.82 2.12 182.71 2.75 222.91 4.17 267.46 2.16 315.89 2.09 367.88 1.32 422.77 6.13 484.57 8.32 553.71 0.47 1.95 S 115.76 E 115.78 S 89 2 E 0.50 N 148.43 E 148.43 N 89 48 E 5.08 N 184.04 E 184,11 N 88 25 E 12.21 N 223.62 E 223.95 N 86 52 E 22.10 N 267.17 E 268.08 N 85 16 E 32.56 N 314.57 E 316.25 N 84 5 E 43.38 N 365.52 E 368.08 N 83 14 E 53.96 N 419.42 E 422.88 N 82 40 E 63.51 N 480.48 E 484.66 N 82 28 E 72.89 N 549.00 E 553,81 N 82 26 E 2000.00 1834.83 1704.83 45 12 2100.00 1903,32 1773.32 48 33 2200.00 1967.73 1837.73 50 51 2300.00 2030.94 1900.94 51 22 2400.00 2090.37 1960.37 55 1 2500.00 2145.36 2015.36 57 34 2600.00 2199.01 2069.01 58 26 2700.00 2248.94 2118.94 61 25 2800.00 2294.65 2164.65 64 58 2900.00 2334.21 2204.21 67 12 N 81 46 E 624.08 N 82 27 E 696.92 N 83 35 E 773.36 N 84 3 E 850.78 N 83 12 E 931.11 N 82 20 E 1014.60 N 81 59 E 1098.98 N 80 29 E 1185.61 N 79 8 E 1274.50 N 78 23 E 1366.22 I .05 2.46 0.63 3.82 2.45 0.86 4.90 3.27 6.82 1 ,51 82.63 N 618.70 E 624.19 N 82 24 E 92.83 N 690.82 E 697.02 N 82 21 E 102.01 N 766.74 E 773.50 N 82 25 E 110.21 N 843.80 E 850.97 N 82 34 E 119.20 N 923.69 E 931.35 N 82 39 E 129.96 N 1006.51 E 1014.86 N 82 39 E 141.21 N 1090.14 E 1099.25 N 82 37 E 154.62 N 1175.72 E 1185.85 N 82 30 E 170.17 N 1263.28 E 1274.69 N 82 20 E 188.49 N 1353.27 E 1366.33 N 82 4 E 3000.00 2373.14 2243.14 66 56 3100.'00 2412.58 2282.58 66 40 3200.00 2452.63 2322.63 65 48 3300.00 2494.14 2364,14 65 19 3400.00 2535.94 2405.94 65 9 3500.00 2578.77 2448.77 63 58 3600,00 2623.22 2493.22 63 20 3700,00 2669.17 2539.17 61 53 3800.00 2713.93 2583.93 65 40 3900.00 2754.58 2624,58 65 51 N 78 37 E 1458.22 N 78 28 E 1550.01 N 79 3 E 1641.54 N 79 22 E 1732.45 N 79 38 E 1823.25 N 80 15 E 1913.58 N 80 36 E 2003.15 N 81 13 E 2091.96 N 80 10 E 2181.35 N 80 18 E 2272.69 0.48 0.55 0.90 0.47 0.64 1 .23 1 .34 0.78 2.29 2.10 206.81 N 1443.54 E 1458.28 N 81 51 E 225.01 N 1533.61 E 1550.03 N 81 39 E 242.95 N 1623.47 E 1641.54 N 81 29 E 259.93 N 1712.84 E 1732.45 N 81 22 E 276.48 N 1802.17 E 1823.25 N 81 17 E 292.27 N 1891,14 E 1913.59 N 81 13 E 307.22 N 1979.46 E 2003.16 N 81 11 E 321,06 N 2067.18 E 2091.97 N 81 10 E 335,65 N 2155.38 E 2181.36 N 81 9 E 351.28 N 2245.40 E 2272.71 N 81 7 E COMPUTATION DATE: 29-MAY-91 PAGE 2 ARCO ALASKA, INC. 1L-20X KUPARUK RIVER NORTH SLOPE, ALASKA DATE OF SURVEY: 13-MAY-91 KELLY BUSHING ELEVATION: 130.00 FT ENGINEER: JEFF FORMICA INTERPOLATED VALUES FOR EVEN 100 FEET OF MEASURED DEPTH TRUE SUB-SEA COURSE VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUTH DEPTH DEPTH DEPTH DEG MIN DEG MIN FEET DEG/IO0 FEET FEET FEET DEG MIN 4000 O0 2796.48 2666.48 64 49 N 80 34 E 2363.48 4100 4200 4300 4400 4500 4600 4700 4800 4900 O0 2840.02 2710.02 63 37 N 80 42 E 2453.49 O0 2885.10 2755.10 62 42 N 79 43 E 2542.73 O0 2931.24 2801.24 63 11 N 79 45 E 2631.42 O0 2975.44 2845.44 63 49 N 7g 48 E 2721.08 O0 3018.61 2888.61 64 42 N 80 22 E 2811.26 O0 3061.83 2931.83 63 46 N 81 10 E 2901.43 O0 3107.46 2977.46 62 16 N 81 13 E 2990.41 O0 3155.23 3025.23 60 42 N 81 12 E 3078.26 O0 3202.27 3072.27 63 21 N 79 36 E 3166.47 0 80 1 34 1 93 2 54 0 49 1 48 2 O0 1 25 1.62 0.59 366.25 N 2334 95 E 2363.50 N 81 5 E 380.91N 2423 396.21N 2511 411.67 N 2599 427.82 N 2687 443.44 N 2776 457.83 N 2865 471.58 N 2953 484.78 N 3039 77 E 2453.52 N 81 4 E 71 E 2542,77 N 81 2 E 07 E 2631.47 N 81 0 E 31 E 2721.15 N BO 57 E 14 E 2811.34 N BO 55 E 16 E 2901.51 N 80 55 E 07 E 2990.49 N 80 56 E 92 E 3078.34 N 80 56 E 499.52 N 3126.91 E 3166.56 N 80 55 E 5000 O0 3247.70 3117.70 63 15 N 79 35 E 3255.51 5100 5200 5300 5400 5500 5600 5700 5800 5900 O0 3290.38 3160.38 65 11 N 79 32 E 3345.90 O0 3332.92 3202.92 65 7 N 79 56 E 3436.36 O0 3372.88 3242.88 67 2 N 80 12 E 3528.00 O0 3413.08 3283.08 65 26 N 80 30 E 3619.55 O0 3456.18 3326.18 63 29 N 80 24 E 3709.77 O0 3502.13 3372.13 63 5 N 80 39 E 3798.57 O0 3544.66 3414.66 65 18 N 81 54 E 3889.06 O0 3587.59 3457.59 63 50 N 82 39 E 3979.36 O0 3632.60 3502.60 62 41 N 83 9 E 4068.62 3.95 0.72 2.74 1 .31 1 .67 2.74 4.36 1 .30 1 .70 0.48 515.57 N 3214.54 E 3255.62 N 80 53 E 532.09 N 3303.45 E 3346.02 N 80 51 E 548.24 N 3392.49 E 3436.51 N 80 49 E 563.99 N 3482.79 E 3528.16 N 80 48 E 579.29 N 3573.06 E 3619.72 N 80 47 E 594..30 N 3662.04 E 3709.95 N 80 47 E 608.92 N 3749.64 E 3798.76 N 80 47 E 622.68 N 3839.08 E 3889.25 N 80 47 E 634.77 N 3928.58 E 3979.53 N 80 49 E 645.77 N 4017.19 E 4068.77 N 80 52 E 6000 O0 3677 14 3547.14 64 17 N 84 21 E 4158.08 6100 62OO 6300 640O 6500 6600 6700 6800 6900 O0 3720 O0 3763 O0 3806 O0 3848 O0 3890 O0 3932 O0 3973 O0 4015 O0 4059 81 3590.81 64 24 N 84 39 E 4247 89 69 3633.69 64 46 N 84 35 E 4338 23 3676.23 64 55 N 84 26 E 4428 43 3718.43 65 7 N 85 20 E 4518 30 3760.30 65 14 N 85 14 E 4609 03 3802.03 65 24 N 85 10 E 4700 73 3843.73 65 21 N 84 52 E 4790 86 3885.86 64 33 N 84 7 E 4881 27 3929.27 64 1 N 83 22 E 4971 08 45 94 54 22 91 46 47 1 .45 0.46 0.62 0.46 0.93 0.65 0.89 0.44 1 .87 0.68 655.68 N 4106.17 E 4158 19 N 80 56 E 664.10 N 4195.74 E 4247 672.57 N 4285.68 E 4338 681.28 N 4375.76 E 4428 689.48 N 4466.04 E 4518 696.87 N 4556.56 E 4609 704.55 N 4647.11 E 4700 712.37 N 4737.66 E 4790 720.96 N 4827.95 E 4881 730.68 N 4917.51 E 4971 97 N 81 0 E 13 N 81 5 E 48 N 81 9 E 95 N 81 13 E 54 N 81 18 E 22 N 81 23 E 92 N 81 27 E 48 N 81 30 E 50 N 81 33 E 7000.00 4103 10 3973.10 63 53 N 82 43 E 5061.31 7100.00 4146 7200.00 4188 73O0.00 4229 7400.00 4269 7500.00 4308 7600.00 4347 7700.00 4386 7800.00 4424 7900.00 4463 54 4016.54 65 3 N 84 0 E 5151.34 24 4058.24 65 30 N 84 17 E 5242.11 51 4099.51 65 50 N 84 27 E 5333.08 18 4139.18 66 53 N 84 52 E 5424.70 41 4178.41 67 2 N 84 52 E 5516.51 37 4217.37 67 3 N 84 33 E 5608.46 33 4256.33 67 8 N 84 28 E 5700.42 97 4294.97 67 17 N 84 14 E 5792.52 63 4333.63 67 17 N 83 59 E 5884.64 0.96 3.08 0.74 2.10 0.78 0.34 0.77 0.48 1 .00 0.49 741.59 N 5006.72 E 5061.35 N 81 34 E 752.74 N 5096.10 E 5151.39 N 81 36 E 761,73 N 5186.54 E 5242.18 N 81 39 E 770.88 N 5277.17 E 5333.18 N 81 41 E 779.06 N 5368.59 E 5424.82 N 81 45 E 787.38 N 5460.20 E 5516.68 N 81 48 E 795.86 N 5551.91 E 5608.66 N 81 51 E 804.72 N 5643.58 E 5700.67 N 81 53 E 813.82 N 5735.36 E 5792.81 N 81 55 E 823.27 N 5827.10 E 5884,97 N 81 58 E COMPUTATION DATE: 29-MAY-91 PAGE 3 ARCO ALASKA, [NC. 1L-20X KUPARUK RZVER NORTH SLOPE, ALASKA DATE OF SURVEY: 13-MAY-91 KELLY BUSHZNG ELEVATION: 130.00 FT ENGINEER: JEFF FORMZCA INTERPOLATED VALUES FOR EVEN 100 FEET OF MEASURED DEPTH TRUE SUB-SEA COURSE MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH DEPTH DEPTH DEPTH DEG MIN DEG MIN VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUTH FEET DEG/IO0 FEET FEET FEET DEG MIN 8000 O0 4502 16 4372.16 67 26 8100 O0 4540.29 4410.29 67 45 8200 O0 4577 78 4447.78 68 9 8300 O0 4614 84 4484.84 68 21 8400 O0 4651 42 4521.42 68 37 8500 O0 4687 65 4557.65 68 57 8600 O0 4723 63 4593.63 68 59 8700 O0 4759 26 4629.26 69 14 8800.00 4795.08 4665.08 68 35 8900.00 4831.55 4701.55 68 40 N 83 37 E 5976 83. N 83 15 E 6069 22 N 82 56 E 6161 88 N 82 37 E 6254 73 N 82 19 E 6347 78 N 82 9 E 6440 98 N. 81 36 E 6534 28 N 81 14 E 6627 72 N 82 51 E 6721 08 N 82 39 E 6814,16 0 75 051 0 65 0 58 0 53 0 87 0 72 1.01 1.30 0.27 833,21 N 5918,84 E 5977 20 N 81 59 E 843.82 N 6010.68 E 6069 855.00 N 6102.71 E 6162 866.64 N 6194.86 E 6255 878.79 N 6287.13 E 6348 891.46 N 6379.47 E 6441 904.71 N 6471.83 E 6534 918.70 N 6564.21 E 6628 932.32 N 6656.57 E 6721 943.95 N 6748.96 E 6814 62 N 82 1 E 31 N 82 1 E 18 N 82 2 E 25 N 82 3 E 45 N 82 3 E 76 N 82 3 E 19 N 82 2 E 55 N 82 2 E 65 N 82 2 E 9000,00 4867,83 4737,83 68 49 9100,00 4903,86 4773.86 68 54 9200.00 4939.72 4809.72 69 7 9300.00 4975.27 4845.27 69 13 9400.00 5012.25 4882.25 67 41 9500.00 5050.18 4920.18 67 46 9600.00 5087.80 4957.80 68 6 9700.00 5125.14 4995.14 67 53 9800.00 5162.87 5032.87 67 54 9900.00 5200.37 5070.37 68 3 N 82 17 E 6907.32 0.63 N 81 58 E 7000.60 0.70 N 81 40 E 7093.95 0.39 N 81 25 E 7187.41 0.42 N 81 30 E 7280.32 0.50 N 81 9 E 7372.84 0.68 N 80 50 E 7465.49 0.62 N 80 31 E 7558.26 ' 1.19 N 80 17 E 7650.85 0.59 N 80 5 E 7743.53 0.45 956.16 N 6841.34 E 6907.83 N 82 3 E 968.92 N 6933.74 E 7001.12 N 82 3 E 982.18 N 7026.15 E 7094.46 N 82 3 E 995.94 N 7118.59 E 7187.93 N 82 2 E 1009.82 N 7210.46 E 7280.83 N 82 2 E 1023.82 N 7301.92 E 7373.34 N 82 1 E 1038.34 N 7393.43 E 7465.98 N 82 0 E 1053.36 N 7484.97 E 7558.73 N 81 59 E 1068.85 N 7576.28 E 7651.30 N 81 58 E 1084.66 N 7667.62 E 7743.96 N 81 57 E 10000 O0 5237,79 5107,79 67 57 10100 O0 5276,13 5146.13 66 16 10200 O0 5319,13 5189,13 64 9 10300 O0 5362.40 5232,40 64 25 10400 O0 5405.38 5275.38 64 44 10500 O0 5447,57 5317,57 65 16 10600 O0 5489,24 5359.24 65 24 10700 O0 5531.54 5401,54 64 5 10800 O0 5574.89 5444,89 64 27 10900,00 5617.82 5487.82 64 38 N 79 45 E 7836,24 0.15 N 79 4 E 7928.55 7,18 N 78 16 E 8018,71 0,87 N 78 15 E 8108,74 0,65 N 78 1 E 8198,89 1.09 N 77 51 E 8289,40 0,98 N 77 40 E 8380,12 1,06 N 77 45 E 8470,54 0,63 N 77 38 E 8560,47 0,73 N 77 38 E 8650.60 0,71 1100,89 N 7758,92 E 7836,63 N 81 55 E 1117.74 N 7849,73 E 7928,91 N 81 54 E 1135.70 N 7938,20 E 8019,03 N 81 51 E 1153.94 N 8026.48 E 8109,01 N 81 49 E 1172.43 N 8114,86 E 8199 12 N 81 47 E 1191,36 N 8203,53 E 8289 59 N 81 44 E 1210,71 N 8292,35 E 8380 27 N 81 42 E 1230,09 N 8380,86 E 8470 65 N 81 39 E 1249,22 N 8468.92 E 8560 56 N 81 37 E 1268,49 N 8557.16 E 8650 66 N 81 34 E 11000,00 5660.44 5530,44 64 51 N 77 26 E 8740,87 11100,00 5703.49 5573,49 63 59 N 77 23 E 8830.91 11200,00 5747,04 5617.04 64 26 N 77 14 E 8920,71 11300,00 5789.82 5659.82 64 51 N 77 10 E 9010.86 11400.00 5832.25 5702.25 64 25 N 76 58 E 9101,16 11500,00 5875,43 5745.43 64 25 N 76 58 E 9191,10 11600,00 5918,62 5788,62 64 25 N 76 58 E 9281,02 11700,00 5961.81 5831.81 64 25 N 76 58 E 9370,95 11800,00 6005,00 5875,00 64 25 N 76 58 E 9460,88 11900.00 6048,19 5918,19 64 25 N 76 58 E 9550,80 0.39 0.26 0.00 0.44 2.77 0.00 0.00 0.00 0.00 0.00 1287.98 N 8645.50 E 8740.91 N 81 32 E 1307.65 N 8733.58 E 8830.94 N 81 29 E 1327.40 N 8821.41 E 8920.72 N 81 27 E 1347.42 N 8909,55 E 9010.86 N 81 24 E 1367,63 N 8997,82 E 9101.16 N 81 21 E 1387,96 N 9085,69 E 9191,10 N 81 19 E 1408,31 N 9173,56 E 9281,03 N 81 16 E 1428.66 N 9261,43 E 9370,97 N 81 14 E 1449,01 N 9349,29 E 9460,91 N 81 11 E 1469.36 N 9437.16 E 9550.86 N 81 9 E COMPUTATION DATE: 29-MAY-91 PAGE 4 ARCO ALASKA, INC. 1L-20X KUPARUK RIVER NORTH SLOPE, ALASKA DATE OF SURVEY: 13-MAY-91 KELLY BUSHING ELEVATION: 130.00 FT ENGINEER: JEFF FORMICA INTERPOLATED VALUES FOR EVEN 100 FEET OF MEASURED DEPTH TRUE SUB-SEA COURSE VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUTH DEPTH DEPTH DEPTH DEG MIN DEG MIN FEET DEG/IO0 FEET FEET FEET DEG MIN 12000.00 6091.38 5961.38 64 25 N 76 58 E 9640.73 12100.00 6134.57 6004.57 64 25 N 76 58 E 9730.66 12200.00 6177.76 6047,76 64 25 N 76 58 E 9820,59 12300.00 6220.95 6090.95 64 25 N 76 58 E 9910.51 12400,00 6264,14 6134.14 64 25 N 76 58 E 10000,44 12500.00 6307.33 6177.33 64 25 N 76 58 E 10090.37 12532,00 6321.16 6191.16 64 25 N 76 58 E 10119.15 0 O0 1489.71 N 9525.02 E 9640.82 N 81 7 E 0 O0 1510.06 N 9612.89 E 9730.77 N 81 4 E 0 O0 1530,41 N 9700.76 E 9820.74 N 81 2 E 0 O0 1550.76 N 9788.62 E 9910.70 N 81 0 E 0 O0 1571.11 N 9876.49 E~0000.67 N 80 58 E 0 O0 1591.46 N 9964.36 E10090.65 N 80 56 E 0 O0 1597.97 N 9992,47 E10119,44 N 80 55 E COMPUTATION DATE: 29-MAY-91 PAGE 5 ARCO ALASKA, INC. 1L-20X KUPARUK RIVER NORTH SLOPE, ALASKA DATE OF SURVEY: 13-MAY-91 KELLV BUSHING ELEVATION: 130,00 FT ENGINEER: JEFF FORMICA INTERPOLATED VALUES FOR EVEN 1000 FEET OF MEASURED DEPTH TRUE SUB-SEA COURSE VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST, AZIMUTH DEPTH DEPTH DEPTH DEG MIN DEG MIN FEET DEG/IO0 FEET FEET FEET DEG MIN 0.00 0 O0 -130.00 0 0 N 0 0 E 0.00 1000.00 987 90 857.90 18 4 N 88 10 E 114.15 2000.00 1834 83 1704.83 45 12 N 81 46 E 624.08 3000.00 2373 14 2243.14 66 56 N 78 37 E 1458.22 4000.00 2796 48 2666.48 64 49 N 80 34 E 2363,48 5000.00 3247 70 3117.70 63 15 N 79 35 E 3255.51 6000.00 3677 14 3547.14 64 17 N 84 21 E 4158.08 7000.00 4103.10 3973.10 63 53 N 82 43 E 5061.31 8000.00 4502.16 4372.16 67 26 N 83 37 E 5976.83 9000.00 4867.83 4737.83 68 49 N 82 17 E 6907.32 0 O0 1 68 1 05 0 48 0 80 3 95 1 45 0.96 0.75 0.63 0.00 N 0.00 E 0.00 N 0 0 E 1.95 S 115.76 E 115.78 S 89 2 E 82.63 N 618.70 E 624.19 N 82 24 E 206.81 N 1443.54 E 1458.28 N 81 51 E 366.25 N 2334.95 E 2363.50 N 81 5 E 515.57 N 3214.54 E 3255.62 N BO 53 E 655.68 N 4106.17 E 4158.19 N 80 56 E 741.59 N 5006.72 E 5061.35 N 81 34 E 833,21 N 5918.84 E 5977.20 N 81 59 E 956.16 N 6841.34 E 6907.83 N 82 3 E 10000.00 5237.79 5107.79 67 57 N 79 45 E 7836.24 11000.00 5660.44 5530.44 64 51 N 77 26 E 8740.87 12000.00 6091.38 5961.38 64 25 N 76 58 E 9640.73 12532.00 6321.16 6191.16 64 25 N 76 58 E 10119.15 0.15 1100.89 N 7758.92 E 7836.63 N 81 55 E 0.39 1287.98 N 8645.50 E 8740.91 N 81 32 E 0.00 1489.71 N 9525.02 E 9640.82 N 81 7 E 0.00 1597.97 N 9992.47 E10119.44 N 80 55 E COMPUTATION DATE: 29-MAY-91 PAGE 6 ARCO ALASKA, INC. 1L-20X KUPARUK RIVER NORTH SLOPE, ALASKA DATE OF SURVEY: 13-MAY-91 KELLY BUSHING ELEVATION: 130,00 FT INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH TRUE SUB-SEA COURSE MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH DEPTH DEPTH DEPTH DEG MIN DEG MIN ENGINEER: JEFF FORMICA 0.00 -130.00 0 0 N 0 0 E 130.00 0.00 0 2 S 30 52 W 230.00 100.00 0 25 S 26 12 E 330.00 200.00 1 57 S 69 5 E 430.00 300.00 4 29 S 76 58 E 530.00 400,00 6 35 S 81 44 E 630,00 500.00 9 3 S 88 45 E 730.00 600,00 11 25 N 85 9 E 830.00 700.00 13 40 N 86 58 E 930.00 800.00 16 45 N 88 55 E VERTICAL DOGLEG RECTANGULAR COORDZNATES HORIZ. DEPARTURE SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST, AZIMUTH FEET DEG/IO0 FEET FEET FEET DEG MIN 0 O0 130 O0 230 O0 330 02 430 20 530 66 631 61 733 27 835 71 939 31 0.00 -0.05 0.04 1.37 6.59 15.64 28.97 47.17 69.27 96.09 1044.42 1030.00 900.00 19 8 1150.82 1130.00 1000.00 20 59 1259.06 1230.00 1100.00 23 56 1369,96 1330.00 1200.00 27 1 1483.66 1430.00 1300.00 30 1 1600.62 1530.00 1400.00 32 6 1720,96 1630.00 1500.00 36 33 1852.78 1730.00 1600.00 44 17 1993.15 1830.00 1700.00 45 7 2140.71 1930.00 1800.00 49 43 N 85 46 E 128.24 N 82 48 E '164.53 N 79 39 E 205.91 N 76 54 E 253.73 N 77 50 E 307.68 N 78 5 E 368.21 N 80 27 E 435.05 N 82 10 E 520.74 N 81 46 E 619.23 N 82 59 E 727.66 2298,51 2030.00 1900 O0 51 19 2471.44 2130.00 2000 2661.14 2230.00 2100 2889.12 2330 O0 2200 3144.00 2430 O0 2300 3385,85 2530 O0 2400 3615.07 2630 O0 2500 3839.45 2730 O0 2600 4077.37 2830 O0 2700 4297.26 2930 O0 2800 N 84 3 E 849.62 O0 57 20 N 82 21 E 990.53 O0 60 20 N 80 55 E 1151.67 O0 67 17 N 78 22 E 1356.20 O0 66 38 N 78 37 E 1590.36 O0 65 14 N 79 37 E 1810.41 O0 63 14 N 80 44 E 2016.61 O0 66 6 N 80 9 E 2217.36 O0 63 50 N 80 42 E 2433,20 O0 63 7 N 79 47 E 2628.98 4526.63 3030.00 2900.00 64 40 N 80 35 E 2835 33 N 81 27 E 3O32 N 79 39 E 3221 N 79 55 E 3430 N 80 25 E 3655 N 81 26 E 3856 N 83 7 E 4063 N 84 37 E 4267 N 84 51 E 4479 N 85 10 E 4695 66 05 O9 87 97 58 11 31 ,80 4747.89 3130.00 3000.00 61 33 4961.24 3230.00 3100.00 62 40 5193.09 3330 O0 3200.00 64 58 5440.07 3430 O0 3300.00 64 37 5664.71 3530 O0 3400,00 65 34 5894.32 3630 O0 3500.00 62 43 6121.33 3730 O0 3600,00 64 31 6356,22 3830 O0 3700.00 65 5 6595.13 3930.00 3800,00 65 25 0 O0 0 18 0 85 2 58 1 51 281 3 10 0.90 2.53 2.63 0.00 N 0.00 E 0.00 N 0 0 E 0.11 N 0.07 W 0.13 N 31 27 W 0.21 S 0.07 E 0,22 S 18 14 E 1.24 S 1.57 E 2.00 5 51 43 E 2.84 S 7.10 E 7,65 S 68 12 E 4.63 S 16.52 E 17.16 S 74 21 E 5.76 S 30.18 E 30.73 S 79 12 E 4.83 S 48.45 E 48.69 S 84 18 E 3.25 S 70.56 E 70.64 S 87 22 E 2.37 S 97.56 E 97.59 5 88 36 E 2.88 3.13 2.57 2.04 3.11 1 .38 5.08 1 .01 0.96 4.40 1.22,5 129.90 E 129.90 S 89 28 E 2.55 N 166.03 E 166.05 N 89 7 E 8.98 N 206.91 E 207.11 N 87 31 E 19.00 N 253.76 E 254.47 N 85 43 E 30.84 N 306.53 E 308.08 N 84 15 E 43.45 N 365.84 E 368.41 N 83 14 E 56.04 N 431.53 E 435.16 N 82 36 E 68.48 N 516.32 E 520.84 N 82 27 E 81.93 N 613.89 E 619.33 N 82 24 E 96.73 N 721.32 E 727.78 N 82 22 E 3.59 1 .07 1 .66 0.49 0.89 0.46 1.11 0.41 1 .03 2.61 110.09 N 842.64 E 849.81 N 82 33 E 126.75 N 982.65 E 990.79 N 82 39 E 149.16 N 1142.23 E 1151.93 N 82 34 E 186.46 N 1343.44 E 1356.32 N 82 6 E 233 04 N 1573.21 E 1590 37 N 81 34 E 274 17 N 1789.53 E 1810 41 N 81 17 E 309 40 N 1992.74 E 2016 62 N 81 10 E 341 81 N 2190.88 E 2217 38 N 81 8 E 377 63 N 2403.75 E 2433 23 N 81 4 E 411 24 N 2596.66 E 2629 02 N 81 0 E 0.80 2 25 1 42 2 O8 1 93 1 04 0 87 0 62 1 12 0 56 447.42 N 2799.89 E 2835.41 N 80 55 E 477.95 N 2994.85 E 3032.74 N 80 56 E 509.36 N 3180.62 E 3221.15 N 80 54 E 547.15 N 3386,32 E 3430.24 N 80 49 E 585.31 N 3608.89 E 3656.05 N 80 47 E 618.02 N 3807.32 E 3857.16 N 80 47 E 645.17 N 4012.18 E 4063.72 N 80 52 E 665.90 N 4214.90 E 4267.18 N 81 1 E 686.09 N 4426.48 E 4479.33 N 81 11 E 704.18 N 4642.70 E 4695.80 N 81 23 E COMPUTATION DATE: 29-MAY-91 PAGE 7 ARCO ALASKA, INC. 1L-20X KUPARUK RIVER NORTH SLOPE, ALASKA DATE OF SURVEY: 13-MAY-91 KELLY BUSHING ELEVATION: 130.00 FT ENGINEER: JEFF FORMICA INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH TRUE SUB-SEA COURSE VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUTH DEPTH DEPTH DEPTH DEG MIN DEG MIN FEET DEG/IO0 FEET FEET FEET DEG 6832.74 4030.00 3900.00 64 23 N 83 58 E 4910.96 7061.31 4130.00 4000.00 64 20 N 82 50 E 5116 39 7301.21 4230.00 4100.00 65 52 N 84 29 E 5334 19 7555.42 4330.00 4200.00 67 6 N 84 42 E 5567 46 7813.01 4430.00 4300.00 67 16 N 84 12 E 5804 51 8072.87 4530.00 4400.00 67 41 N 83 21 E 6044 13 8341.26 4630.00 4500.00 68 35 N 82 34 E 6293 10 8617.76 4730.00 4600.00 69 2 N 81 29 E 6550 86 8895.75 4830.00 4700.00 68 40 N 82 40 E 6810 21 9172.79 4930.00 4800.00 68 58 N 81 46 E 7068.53 1 .33 3.29 2.21 0.27 0,73 0.67 0.30 0.79 0.23 1 .70 724.04 N 4857 32 E 4910 98 N 81 31 E 748.73 N 5061 35 E 5116 43 N 81 35 E 770.99 N 5278 27 E 5334 28 N 81 41 E 792.02 N 5511 03 E 5567 65 N 81 49 E 815.03 N 5747 30 E 5804 80 N 81 56 E 840.89 N 5985 75 E 6044 52 N 82 0 E 871.59 N 6232.91 E 6293 56 N 82 2 E 907.15 N 6488.23 E 6551.34 N 82 2 E 943,44 N 6745.03 E 6810.70 N 82 2 E 978,51 N 7001,00 E 7069.05 N 82 3 E 9446.75 5030.00 4900 O0 67 41 N 81 17 E 7323.56 9712.91 5130.00 5000 O0 67 51 N 80 27 E 7570.22 9979.23 5230.00 5100 O0 68 1 N 79 49 E 7816.99 10225.03 5330.00 5200 O0 64 19 N 78 18 E 8041.23 10458.15 5430.00 5300 O0 65 6 N 77 57 E 8251.48 10696.48 5530.00 5400 O0 64 5 N 77 45 E 8467.38 10928.49 5630.00 5500.00 64 44 N 77 36 E 8676.30 11160.66 5730.00 5600.00 64 13 N 77 20 E 8885.34 11394.78 5830.00 5700.00 64 34 N 76 59 E 9096.46 11626.35 5930.00 5800.00 64 25 N 76 58 E 9304.72 11857.88 6030.00 5900.00 64 25 N 76 58 E 9512.93 12089.41 6130.00 6000.00 64 25 N 76 58 E 9721.14 12320.94 6230.00 6100.00 64 25 N 76 58 E 9929.35 12532.00 6321.16 6191.16 64 25 N 76 58 E 10119.15 0.49 1016.30 N 7253.21 E 7324.07 N 82 1 E 0.73 1055.34 N 7496.77 E 7570.69 N 81 59 E 0.66 1097,47 N 7739.98 E 7817.40 N 81 56 E 0.60 1140,28 N 7960.27 E 8041.53 N 81 51 E 0,60 1183.41 N 8166.39 E 8251.69 N 81 45 E 0.64 1229.42 N 8377.77 E 8467.49 N 81 39 E 0.59 1274.01 N 8582.31 E 8676.36 N 81 33 E 0.39 1319.58 N 8786.82 E 8885.35 N 81 28 E 2.77 1366.57 N 8993.23 E 9096.46 N 81 22 E 0,00 1413.67 N 9196,71 E 9304,73 N 81 16 E 0.00 1460.79 N 9400.15 E 9512.98 N 81 10 E 0.00 1507.91 N 9603.59 E 9721.25 N 81 5 E 0.00 1555.03 N 9807.03 E 9929.55 N 80 59 E 0.00 1597.97 N 9992.47 E10119.44 N 80 55 E COMPUTATION DATE: 29-MAY-91 PAGE 8 ARCO ALASKA, INC. 1L-20X KUPARUK RIVER NORTH SLOPE, ALASKA MARKER BOTTOM 9 5/8" CASING GCT LAST READING TOP 5 1/2" CASING BOTTOM 7" CASING PBTD BOTTOM 5 1/2" CASING TD DATE OF SURVEY: 13-MAY-91 KELLY BUSHING ELEVATION: 130.00 FT ENGINEER: JEFF FORMICA INTERPOLATED VALUES FOR CHOSEN HORIZONS SURFACE LOCATION = 75' FSL & 217" FWL, SEC29 TllN RIOE MEASURED DEPTH BELOW KB TVD FROM KB SUB-SEA RECTANGULAR COORDINATES NORTH/SOUTH EAST/WEST 6045.00 11400.10 11463.00 11768.00 12444.00 12522.00 12532.00 3696.75 3566.75 5832.28 5702.28 5859.45 5729.45 5991.18 5861.18 6283.15 6153.15 6316,84 6186.84 6321.16 6191.16 659.52 N 1367.63 N 1380.43 N 1442.50 N 1580.07 N 1595.94 N 1597.97 N 4146 49 E 8997 92 E 9053 18 E 9321 17 E 9915 15 E 9983 69 E 9992 47 E ARCO ALASKA, INC. 1L-20X KUPARUK RIVER NORTH SLOPE, ALASKA MARKER PBTD TD COMPUTATION DATE: 29-MAY-91 STRATIGRAPHIC SUMMARY MEASURED DEPTH BELOW KB 12444.00 12532.00 PAGE 9 DATE OF SURVEY: 13-MAY-91 KELLY BUSHING ELEVATION: 130,00 FT ENGINEER: JEFF FORMICA SURFACE LOCATION = 75' FSL & 217" FWL, SEC29 T11N RIOE TVD RECTANGULAR COORDINATES FROM KB. SUB-SEA NORTH/SOUTH EAST/WEST 6283.15 6153.15 1580.07 N 9915.15 E 6321.16 6191.16 1597.97 N 9992.47 E FINAL WELL LOCATION AT TD: TRUE SUB-SEA MEASURED VERTICAL VERTICAL DEPTH DEPTH DEPTH HORIZONTAL DEPARTURE DISTANCE AZIMUTH FEET DEG MIN 12532.00 6321.16 6191.16 10119.44 N 80 55 E SCHLUMBF-RGER D I RECT I ONA/ SURVEY COMPANY ARCO ALASKA, INC. NELL 1L-20X FIELD KUPARUK RIVER COUNTRY USA RUN ONE DATE LOOOED 13 - MAY - 91 REFERENCE 74S88 WELL · (75' 1L-20X ~ ..~ -~'HORIZONTAL PROJECTION FSL, ~17' 'FWL, SEC , TllN, RIOE) N~TH 8000 6000 4000 ~000 -~000 -4000 -6000 SOU'TH -8OOO -40OO WEST REF 74S88 SCRLE : 1/2000 IN/FT i L ii J?t~"'~ [;;[:;;:;~'-~F-..+~-t--t;--i--t-?--!--t;-t--t-t--I-h±'1 .... t'-f-~--f-1--}'-~--~-"..'f-fi-'! ...... i-i--i---t ...... f"f'i-i-v"f-+--?"f-'t "i'"f"fi ..... '-;"+'i'"::'"- ."1'- -t'-!-. -~ ~'~-. '?-'t'--!-. -" ~ ~ t- -~'-'?''' "'~""7!--. 'T ..... ?--?-? ....... T-'T-'?'"~.-'["'?-!-%T--?-' "-t'-?" '--~"~ "~-- ~- ........ *--e.-~---* ...... ~--.*--*-..~ ...... e.--~.-*--.t.--t-.-~.--~.-.?-.~.....-,...~...,...~ ....... 4.-.4..-t..4..- i i~-f.f~-~i q.-f~-..-F~-.~ .... ~..4_~ .... -:-*.:+h.++.++, ~i *:-+.~-*;'-+--.." .... H--+-.i-.-*N--+-i-----4--!.4+-~--4-;--,.'...~ ...... N-?."...; ....... i'-4--?"-4'-- -?'.?-T-;-t-r-r'-r?" ~-t.-,'l--t-, ?-....-t--;-.,--..~-'-'t'".-~-~--?--t..-f.-f;---f.-f-- -+-f---i-~: .... ~..4..4--~ .... ~.-~--4-4.. i...~-4...4,...,~ .... $..-,~...,~-~ ....... 4..4-.~..4 ...... ~,-..-K..~..-;, ....... ~...J,...~....J, .... ~...L.4..4 .... ~ 4-44 - --~-~ 4--F.: q--~LF- : 4-.~-~---i-:' 4-~--.;-4-~-4.4-4 ..... ~,-4-4-4---4.4- ~ ! 4-~..L4- -~4-4-L -4-.~-.~- 1 -4- L 4.4. · L-;-.~--; .... ; L4 ~ i 4- ~ 4 - L4 ~.4..- ~ ..' ; ~ ~ ~ i i ; ~ ~ ~ i : *., ..-T-f ~..-f....I-~ ~ ~ T "f. ~ .t ~ I-- -f..-T.. ~-f.. .... .?T,-~-'~--I"?"T'-T-":'-T-'~-'T ....... ?.-.t"T"T ..... T-'~"'..~'? ...... ?"'f'"T-'? ..... ?"'f"'?'"t. ....... -'*-,*-?-I-. 't-.-??-t-*.--'-!---t-'T-'? .... ~.-4--~-~----4--~--4--i-.-~--4-4.-4--~ .... ~---~-4--~--~.-4-4--P- --i-4- ~ ~-. --4---~-4-~-- :~ 4 4-~ 4-4 4 4 4 4 ~ · ~ 4 $ ~- -~ 4 ...... ii Ill! ii I i ~ i I ! i j ! i i ; i/ i j j : ! i i j ! ! ! ; i i i i : : : : j i ! ." ~ ; ; i ; ! i ! ; ! : ; : ; : -F'.t-'~..-l" ..-~.."T?" '~.."T-T-t"'-'T-T' :-~..' ..... f-±"?'?f-"..'-~-~ ..... f-'*~-q-.' ~- ..-..'-~.-+.+- --~.'.-.~- .-q-- -.+..~--+..f- .~-.~.-.?'..~ ....... f.-+--t'.-~. ....... ~.-..?'--~..-.~.--..-+.+.-½..+.- ..+.4...~..4...t...~..~-4...~..- -~::L-~---i-.,l..-4.-.P..~-.4.......4--1..4 ~' -~ i~..L -.i.-~. '--4- ~- ' ' '..'-- ..:-:.-,: : ] ; : : : : : : : : : ; ; ; : : : : : : : ; : : : : ; : ' ' : : : i : ~ ! ~ ! ~ : ii' : t T-f.' ~ 'T !' ?71-'i'--?--??-'"?--t."'?"-t.--"?'"?"'?"-t ...... r-?'"?'t ....... ?--t"-r"? ..... r--?---r..-t---.---t--t.---r.-? ...... ?--?'--r-? .......... :Fi .-f-q-. --4-;-i-4---~-4-~--~-;-4-.~-4-.~ .... ~.4-4-.~-4-~--+.-~..-~.-..-~-.~-4..4-,-4-4-'-I-: : : : :_ : :_:_:_. :_: :_.' : : :_: : : ;_: ,_: ~ : : : : : ,'I ~ ~ ;~ ; · : ; ' : ~ '.' i ~ ; : : : : : : : : : : : , ~ : : ; : · . · ..T' ~ .'~ ? , ? W ? ? -t +. ? ? -t ? !'. ? ~ T ? ? ? . ? "? ...... ?'"?-'?'? ..... ?"-t"?":'- -~i--~,- -4-4 ......... 4.4-.-L4-I-4.4.....4-4-4-~.-;.4-~-~- .4-4.4.-4- -4-4-4--4.- .4-4-4-4- -4..4'- ~ 4,- -;- ~-4-4 ,$- 3 ; 4 - 4 ~- ;- ;- ] 4-4- ~-; 4 ~ 4 4--~ 4, ~, 4 :- '--H-~-?--.~ f-H.'--f--q-. ~.--~.~..i- 4-.~-q-.4 ~: ,-~-4- -4-~-~ ~44 ii,: ~ ': '; , ........... : :~~-4- ,:'-+-,:'4 .... .;-.~.~+.-+...~..4...~ ....... ,'....;.+-.;...l...:,;.-4...k~ ....... ~--..;.-+...~..b;...-~+-.;... ._,,.._,,_,_~_,-!'-3 i i -,-.~-i i .,}i, ..... ~' ' ~ ' ~: ~ ' ~ ' ~ '"' ' --..~..-++-: .-.-;-.-~'-.',---;..--H-;.F..'-F--...F+-J-f-...-?.'-.~--.?"---3 ....... F--..'..+-..;...!--,;---3-..H ....... ..;.--t:'-4..+..F+.4-4-.4.-- ~ ! ;4: ~ ::!~;i:::~L~:;:?r-:+q:~;:l:T-- :,.!.":~q'-q::~-+~.+.-+: +.~....+.~....+._._.,-+~ ...... ,:...,:..+..? ..... ~_:._,-.:...,...:...~_,_.,:.......,...,.~...~.:....~...~...~__ ~-44-4-.k,44....:4- ................................ ~'ht'?-'t:--t-t-t ..... t'-t'-i:-'f--f-H--'f-i ...... H-':,-i- --f.'...4-...f-.--j---ri-'t'-+'"--+--f-f---~ ...... f-"i-"i-"f'" !-'-'F'-~-'-f-"j'--.--+--',.F.-f'.--f-t-.f.4.--f....f.'-.- ~." j i . ; i ~ ! ................. 4 : : : r : : ! ; : : : : : : ; ! : : : ! i ; ; ! ! ; ; J ; I ~ J ! ; :, i i : : : : : : : : : , ; ; : : : : : : : : : : : : : : / : : ~ i'T~.:-T- -]'-T~'~ 'T?T'..""; _ ..~_~_. ~_.-T'T-T'"..'r" -'?-?.-t-T'T"t-f"T~- ~-;-.4--;-.-~-.~-;-.+.-~..-~..-"~-T~'r' ..'T- "~-T' ,'T-~-r-4--~-~-'J]--~i4--4--4 -':"'T--F-T~+' '+~"--';--~"--+"'~"'?'--+'" 'H--+"?'"'~" '".~--'?'"'.~--'+ ....... '~"+"'~"+'" "+"';'"f"~; ...... ~d--I'WS"H~+"~'" --:-,--~-.~?...??.-,---.,~. ~.-~-+....-++.-,-..:..-?'-..~-+ : ~_.~...~...~ ..... ~...~..:...: ...... .~..:...~_.:....__~. ~..~.. :_. ~..~_~ _~ t-'t .-?~ ~ .4.4---4..4-4-..~-4 .... ';,-.i.~4.~4-' ' ' -; ;.L4_~r ; ;i ;i_4..; ~..' t i ......... -] ?fi-'Cf -"-I-.,? :. ~ .r?3-1 .... '..-;-',*'-~- ~---~ .t ~-'~-r.. ~.--,-r-;-m-'-'..-~..-r-?-" -r-":-?-T" -t" -4---:-"-i"i--f-?'----i--±.i-+-.t--?'.-+++-- · ~.-4 : : ~ - P~--4-4--4---P.4-4--4 .-4-~-4---.P ~. 4 :-:- :' -: : : ..LJ i i : .' : ! : : : : : : i ; : : : : ! ! : : ; ..' ! ! i ! i ; '.' ." ; ; ! ~ ! ; i ; ! ; ! ; :--T ~ ~ ; t"-T---i ; ! ; -T'~"T' T'-T'-T'T-'-F'f'-T:-'?. .... 'T..--T.."-T"~ ..... .?"-T-T-'?..'"'-"T-~.-f-? ...... · .4-+-. 44 :::i .;- ~ .4--i -~ ~ .-+H.'---+-.' ~4-4 .... ~-~,4..4. ! ! ! i- .i ] i i ; [ i i 4-4 -i--~-4-4-.,L.4-.i-4-4-.-4-..I..4-.I.-.-4.4-~--;.. HH~qq44~ ~-{~.:44-$..F-.q-i..4-!--H.¢.4.-..J-4~-;.:.~---~.i..~$.4;ii] ~L~.] L.i~44 4.4-i~ ..... i.4.--L-4 ...... i..JZ.L...,.4..~~4- -I ' i : i ~ ; ; :i L-4--.i. ! ; .--' .I--4--.1--.-: i ! i ] ; i ; ; i : : : : _: ! : : : : : : : : : ; : :. ' · ' i i : ..4--;-~' ~" ! J, i : i ! ..' : i iL M ; ~ j : ; i ~ ~ ~. '*..~ J i i i ." ,-F"T.' ,' T 'T- "'i--T-I',-I'..-I'"',.~.'_'"U~J.~.°IErt.,W~: ..... T-?-'.'.'-i'"'T-'T'T':"U-t- ~i '~ '~ -T'"T-T- -' "T!'..- ,"Ut ! T-t-. T' '"1-I'-%-'~"-?-T-t-f- --t.-.'t~.-~- --w-t~..-?. '--r. -i-i~- .4- '-+~--i': .'-~ .-+-i':-'-t-?-~-j_-~. --_,~ ~ --+--.F--i.]-.?'.-- --~m?'.--F-~--+.+-4..-+.~-- -t-~ i ..' ..m ,-r-F' ~ ! ~-~-t-'-r..-t~-m~ ..-mm-, .. ,.-, .-~..--?-:_+~ ~~ ; .:-~-.-...~.~~-?. .... i ~ i -'- : ~ ~ }- "-i--*-4--f----~.'"~;-4~--4-4-4-4---4--4-4-4----4-4-4-.~.C--,I,-~ ~~---L.4--4.-4..-....~-~, :~: i; ;-4-4-~-.-4...~-4-4.~-:..4..4...: ...... ;...~..4..4-.~-.i-' :.. L I j i ! ; ! ; ; : : ~ : : : : : i i ;.~ : : ' : i i i j --i : : : :: : ~ · ~ : I : ~ ~ . , ~..L' : . , , , , , ; ' / / j j ] ~ : : i i i i i : i ~ : ! i ~i i i i i i ! i i i i i i i J i i ; ! i i ; ; : ! i ! ; i J ; ! i J i i j i i : : ' : ; : / : ' : : ~ ~ ~ i~ ? ~; ' ~-i~-~'~-? '~4-+~' ~4'~-..~-'t-~t+ ~-++~-,-t:--t-t-+--~ ~ ~ .-~>~.' -- ..+..t~:~+-..-~.'-..~-~.--~-.~-+.½-~-,~-~-.:..~-~-~.~4.~-~ : :,: ~ ~ ~ ~ ~ ~ ~ : ~ ..' ~ ! ~ ! i : ! ~ ~ ! ! ! .,' ; i ~ ~ : : ~ : : : : : ! ; : : ~:~;: : :' : :. : ~ : ; ~ ~ : : : : :. : : . T .--~-f'"~ t'"?.-'?--T'-?.'" "T'.?'T-~, ...... ?'--?--t--;* .... ?"'t-?"?-1 -?.--t--t-~.- ::~.4.4--~..~ ~_~-.....' ...... hf-i-f" 'i"i'-f-i ..... f"f'i"i""'i-i"i"-f ..... f-~- i-,,,,, ,,,, :::: iiii ¢l~,~ii i i i i , ; i i i i i i : i .... ; j i ............................. ~+-i?t'"tm:"i'.-?1-t-~-i-'~ ~-+'?';~t-+-.~--?--i~-'i--~-i-.H-~-+T-.½--~++-.H .... ?"-+++--H-½--i ...... F-H'--?' ....... i-+'?'"'.:'-"'"?:--+'+-4 .... ~.--~-.+.4--- i i i ?"T-;~'~,T~-i i i'-?'~-'; .-?1'4--± .-h~.~ ;~?? ~-.+-i-; ..-f~ i i f .-i-.-f-f-, ~-±-i-i?~~?.-+-ih-~..±--.-i-~4~~...+-4-.+--?"---...++4..~- ~:{' }~-H i ! ~-.4-~..' 1. ~ i ~ r-t~ ,--~,-~..-~±--'i-f-i-i-i---?'-++-~-.-~+-+.'; ~ ~; ~-~~+-+-+-+'----,: .-~: .-+-....,:-~--+--.~-.-4---?'..+~ .... ~.+..,.'....~-...+-:.-..~...~ ...... -~. -.,~:-f-?-~-.-~-~-k+.;-...--+-+ .-e~: ~-.+.++++-~-?'-~-~..-p4--k- ! ! -+4-- ! ~' ~4-.. 4 .-d-4-+--;.-.~...~...:...-4---i-4.--~ .... ~..4-i--.~... -4.--i-4 .I',_ 4-¥.4-4-- : ,4-4-. .4-:' .k..~-.-F-: ..~.~.+- -4.-4~.." +.. ,-..~4--4-?".4-.~~.~-4'--F-...~-~-.~ ...k__.;..J-~~4....~-.~-.~ ..4.4-.L..~...-..k.~...~-,~ ...... :-.~...:-:.....~...~...~.4 ...... ~~.~...~...: ...... -i-Li-J-. -4.'.4..-.~q ...... t"-..,k-.P~.-i-.~-4.~..-~ ....... ~..4---.i.--~.--[--i--.~-4.4 ....... ~...~..~~4~.4..d-LJ...-~.4...~_..L..4.4-~...i ...... i.4.4..~.4...i...i...i...~. ....... ,'....L..i....i ...... L..~.4....~ ...... L..~...;~...i ...... -L..L.i i i i ; -~ ..'-T-~ ..-I- .: ~ i i i ; T'-F, 'T.. ..... ~ .-T ..-T-T i i i i i i i : ; : ~ ; ~ ! ?; ~ ~.: '.' .-r~--T-?'?-~-l-.'r"?''?'''? ...... .~"t-~"r"l-?"'?"'T-'~'-'~-f"~.-'~'".'r"-'?T~.."'?- : ;. ~ ~- ..+4~.4-.q-: 4- -'.: ;': ~ ~.4--;--.k4-4-- .4 ~:: :;:~ -: -~P ~ ! i ~ 4 ~.- .4.~..-d..-~ - ~,b-4-4 4-~.-~.-4 -L- .,L.4. :.. ~.. 4. 4- .~- .~ -~ .~- ,L .~ ~, 4-4.-4~ -'-i~-?...+--~]. -'w..*--q--t--- ~ .~ ; ~ -T"?-.'r"?---t'".'-?~r'"~-~"-.'r-~. ~ ? ?,--~. ; ; .: F-q-.' +--.-~--+~.'.~.' .... .~ --.'P--,.'---t'--~---.~ ....... ~--.*.'---S--'?'-..i~-.;..~~+--~ ....... ~"-t'-'-~-.~ ....... -'-~-;-:-' ~,~'t",~" ' ' ' ' ' ' ,~r~,m~'-..'--t ..-~-"" :.'~'"'~,: ',- .-~..*.-''" -~'"" :'~ .~-~. ?,*-' "'-? ~ , ~-'~?-*.-*.--+,-*.~.'-t'?"?-?'"?'-"?',"'?~'? ..... ?"?"'?-,'"'"~'-:"',"?""?'-?.'?-' ~ , - , , , : : -- : : : : ~ : : : ; ; ; ; , ..' ! ; ; ! ; : : . ; : : : : ; : r : : . : : : ~ : : : : : : : : : ~ : : : : : : '~'-T-F?T?-?¢!"'-?f-¢'h" %-.W-h -i.;i-hh -'?..'d-h..: i-d?i-.-h-"-ff-?~i f--~:-f-±-'?f--i--*;--? ...... f'±'-f-i"'f'-i---i--i'--~ ...... !"--hT-'f'T'-?'-i-±-!- -'~-½-'*~ ,-~." i-',~-~,-+-.~-' -!',-!-!,'-? ..... ?'"?'",~"-?' -T-'r'!--*, .... ?--?--r-1 .... t-T' ,?-!-, - --r--~.' 1--!' ..... ?'--.~-?'~'~-'--~---.~-~--!"-'--+--?'"'i--'i ...... ~'-'~--'i'--~ ...... i'--i-"~--'~ ...... i'-i"-*.'---~ ...... i-.-~;.-..~...i ...... ~.-.4..4...i-.- Tt ,-r-f-m~-..,..-~---.~-1~,.'.-,:-¢-i--.-~."-4.' .... ½-.H~4 i : ! i ! i ;.'-~-'4-...4--4-P'4-.-'4-4-4-4-.-~-~.4-4.~..i-4...i-;.....4-.~~4..4...I...;...;...;...i ..... ~..4...;.-.L.I...L.L4...i- q! ! !-~'4-*-~--4-~-4-P' ! i ii .-4-~4-i-:'~-4...4-4-4--*.'~4-..~, ,, ! ; ,:, ,-'~4:4-4- .-4-4-4-'-P.~, ~ f -~-4-4'-L-~ ~ ~ ~ ...~-~ ~ ~. , ~ ~,-~-4q-'-L'~-L4--~'4'4-'i'4 ~ f ~ ~ ~ ~ ~ ~ ...... ~...~-¢...~, ~ ; ~ ....... i...~.4.4~; ~; ...... ;...~..4-.~-.; ~ ~¢~ ~ ; ~'-4--'4-4--4--- ~ ~ i ~ i ~ J i j --+-. i--i-: -?--f :: ~ : ! ~ ~ : ~ ~ , ~ ~ ~ -4---4-~-4-.~-~-4-.~-~-~......~-..~..4-.~ ..... 4.-;,..-i....~ ...... ~...~-4.4..4-.~-.~-4...~- .... i : . : : : ; : : : : : : ~ : I : : : I : : ! : : : : ~ : : i : ~ : i : : : : : : ; : . : : : : : : ~ : : : ; : -k4-4-4-. ; ;-~, ~ ~ r..'~-.-r-. ,~r-.. ~'-.-'~ ~ .~ ! ~ ; ~ ~--,-~..~.~--..-?~. ~ ~ .-??-??-?--?---:~--..-?---:-?-~ ....... ?---?--.?-? ...... ?.?---:..-? ..... ?---??--.:-.~.--?-?.~?.-~~- -- -? 4~i- ;; ;--+-.~ .-++...-+-e~.-+:--F-H L~;..?-,:-~.-+4-4-k'--.~:'.--k~--4-.k.~...;-..-p.~-.~-~-.-.~-.~..+J ...... ~...~..4..-~ ....... :...~-~...~ ..... ~...~.4...~ ....... ~.4..~...~-- .... ; ~ ... ; : . · · . .... . , c . . . : : : , : : : : ~ : : : ~ ~ : . . 44.'~-..4-4-:L,.-' ..... ,.."~4-.-}-:.L4.4-.-i..-?.'4~.~ ..... ~.-.~.-?.'% ..... !.4...~.?,' ...... i4-?;...~ ...... L~--?,;..4...'4..4-i...~ ...... !-.-i...!.-.i...l..-i-..i...i-..~ ...... L;...L.~ ....... L.~...;....,:: ...... N...~.4 ..... ~--t~-.+-f-:ii~i ~:~ } H-F"~-H-H--H~--.-H"-i-½~-'++-,':-.F-.4-4_.~-.4- ~.4...~.4 ....... ~.4.4...~ ..... .~.44.4...t.4.4_4.4_ -T'~-'..~-'-i.:-t~-~- ..-m~ t :, ~-i-I~.' i- -~-'i-"Fi-~-4---f~ ..-!-f-+--?i-Y-f---.~±4- .-L.i-i.4- -t..-~"-~--f'-.~. ?-~..: :: ~.: : ~ ~.: ~:: ::'"'""'";"~"'~ -2000 0 2000 4000 6000 8000 10000 12000 EAST WELL · (75' ; VERTICAL 1L-20X ....... - FSL, 217' -FWL, SEC , TllN, RIOE) PROJECTION -ZOOO O O 2000 4000 6000 8000 10000 12000 · "r~... r.TT-'~"' ~'"T~'~ -T'T-T:'TT'?T~ ...... ~TT',-~-TT"'"T-'T"T'?,'TT"T-'T ...... T:.~T~.TT~'~..?..~.x:..T:::1:::f::t:::1.::f::f:1~::1:::f::!:::~:::f::~::.f::f::f::i:::~:::tzz "-."'*-'?-t ...... t"-?'"?'?"- '?'.'-'t'".'.'"f'"' ...... -' ---~------~--~--?--~--~---~-.? ....... t--.?..-t~-.*.---f---~---?-?---? ...... ~--.?--?--? ...... !.--;---i.--i ..... -:---.~-.-~-.-i.--~-..-i--.i---i--;, ...... {"~"'~"'t'"{'"{-'{'"!'"'{ ....... ?'?'-?-'?'-'f"'.*"'. -'?-'-:'" ,--~.-~--,.4...~-.~...~-.,... ~-.~..~.,..4.~.,.~.~---~..~-.,-~4~-4..-~.~ .... ,-~.,-..~ .... . ...~.~- ~.--...'...,.'q ..... i..-i.4-,.' ....... i---i---½-..! ...... i...~...i..i ...... i.-~...i-~....-i...i...i...i ..... .~..?....+..ff ..... -}.-.H---t.-.~ .4-~---+-~:~+-1-~~-¥-H- %+-.H-~--.H--+.-H-½--H-+-H-.H- -H--H--+--H-.H---.~'.-..:,~,.."---~-~:-~ ...... H-+--H--½'-:.:.-"i ...... .H"++- ?,-,:~+--~-,:~-e.~--l-+*:~---~-~-+-~--*:m-.-.'--,.'--,:-~- -ff~++-.~.+~-.---t-..~-.~-~-!-~:~-?-.~ ...... :.-+-+---?-4~-?-.-.~..~.-.* ..... ?'-~:-t.--,'---,~.,--+-+--? ....... ?---,'--+-~ ....... ,..-,.'-,:..+- "i"ti"i'"~'"~" ...... t"i"i"i'" "h'.~hhhffH"'i ..... ?Hffi"i'"H ....... H-'i-ff' ff"i"i"i-'!"i"i"i'"H'ff-ffffi ...... i"i"i'"! .... H"i"i ...... H-'i"H'i"i"i"i ...... i'"H"-i"i'?'~'"?! ::::::::::::::::::::::::::::::::::::::: i:::i:::i:::i::: :::F:i::: ::i::: · .4.4.4....L.. ~....i....i-..-L..L. ..... ' ...... ' ........... ...L.L.L..L.. LL.;"...L4 "I -t -!'.. ~ !71- .'r'T'1 ...L..i...i..4....,...~...LL~ ]4000 81, rq i- (-) l- in ii PROJECTION ON VERTICAL PLANE 81. [ 2~ 1 ] SCALED IN VERTICAL DEPTHS HORIZ SCALE = 1/2000 IN/FT AOGCC: GEOLOGICAL ivIATEP,.IALS iNVENTOi:t.Y LiST PEFIMIT # Ot J - ',~J WELL FLAME )/~ R~.~ iL. -" COMPLETION DATE - "7 t. m,~ I ~ J CO. CONTACT Check off or list data as it is receiv'~d.*list received d~)te for 407. if not required Ii'st as NFl cored intc~al~ core, analysis ~_ d~ ditch intc~als digital data ,'~x~,, ' '~~,,~~ , ,,~, e i LOG TYPE RUN ' INTERVALS SCALE NO. [to thc nearest footJ , {inchl100'J , ~ .... 11) ~2) ~31 .......... .... ~,.) ........... ~ ,, 11} . i i i i i ii ii ii ii ARCO Alaska, Inc. ' Date: July 12, 1991 Transmittal #: 8166 RETURN TO: ARCO Alaska, Inc. ATTN: Maria Trevithick Kuparuk Operations File Clerk ATO-1119 P.O. Box 100360 Anchorage, AK 99510-0360 Transmitted here with are the following Cased Hole items. return one signed copy of this transmittal. 1 L- 2 0 X Cement Bond Log 6 - 2 8 - 9 1 1 L-20X Cement Evaluation Log 6 - 2 8 - 91 Receipt Acknowledge- Please acknowledge receipt and Drilling Slate of Alaska(+sepia) Date' 11450-11981 1 1 450-12408 NSK RECEIVED JUL 1 5 1991 Alaska Oil & Gas Cons. Commission Anchorage ARCO Alaska, Inc. Date: June 7, 1991 RETURN TO: ARCO Alaska, Inc. Attn: Maria Trevithick Kuparuk Records Clerk ATO-1119 P.O. Box 100360 Anchorage, AK 99510-0360 Transmittal #: 8125 Transmitted here with are the following items. one signed copy of this transmittal. Please acknowledge receipt and return ;11.~_2.~ 1L-14 -1L 18 Cli. .'Sy- 2M-16 ql" 51 1L-20X Receipt Acknowledged' '~~.,~,~,\ .~....~..]~_...1~... Directional Survey Directional Survey Directional Survey Directional Survey 5- 1 2-91 74592 5-1 0-91 74584 5- 1 8-91 74583 5-13-91 74588 Date: D&M State of Alaska ARCO Alaska, Inc. Date: Transmittal #: 8090 RETURN TO: ARCO Alaska, Inc. Attn: Maria Trevithick Kuparuk Operations File Clerk ATO-1119 P.O. Box 100360 Anchorage, AK 99510-0360 Transmitted here with are the following Open hole items. and return one signed copy of this transmittal. (~1",.~'/1 L-20X DIL--2' 'x' 1L-20X DIL--5" X, ~ I"'.~' 2 M-1 6 Dipole Shear Sonic Imager x Please acknowledge receipt 4-27-91 4-27-91 4-13-91 1000-1 1 836 1000-1 1 836 2690-6795 Receipt Acknowledged' Date' DISTRIBUTION: D&M Drilling Franzen Vendor Package(Johnston) NSK State of Alaska(+Sepia) ARCO Alaska, Inc. Date: May 10, 1991 Transmittal #: 8089 RETURN TO: ARCO Alaska, Inc. Attn: Maria Trevithick Kuparuk Operations File Clerk ^TO-1119 P.O. Box 100360 Anchorage, AK 99510-0360 Transmitted here with are the following items. Please acknowledge receipt and return one signed copy of this transmittal. 1L-20X LIS Tape and Listing 4-27-9 1 993-1 1 937 Receipt Acknowledged: j~.-~%~ .......... Date' DISTRIBUTION: Lynn Goettinger State of Alaska 'RECEIVED MAY 4 1991 Alaska Oil & Gas Cons. Con]mission Anchorage ARCO Alaska, Inc. Date: May 3, 1991 Transmittal #: 8081 RETURN TO: ARCO Alaska, Inc. Attn: Maria Trevithick Kuparuk Operations File Clerk ATO-1119 P.O. Box 100360 Anchorage, AK 99510-0360 Transmitted here with are the following items. Please acknowledge receipt and return one signed copy of this transmittal. I L-20X LIS Tape and Listing(Colville) 4- 1 7-91 5904-1 1759 Receipt Acknowledged: ~~-----~Date' - ......... / · DISTRIBUTION: Lynn Goettinger State of Alaska .7 ARCO Alaska, Inc. Date: May 3, 1991 Transmittal #: 8085 RETURN TO: ARCO Alaska, Inc. Attn: Maria Trevithick Kuparuk Operations File Clerk ATO-1119 P.O. Box 100360 Anchorage, AK 99510-0360 Transmitted here with are the following Open hole items. Please acknowledge receipt and return one signed copy of this transmittal. 1 L-20X Compe~sated Density Neutron 4-1 7- 1 9-9 1 6044-1 1757 Gamma Ray 1 L-20X Compensated Dual Resistivity 4- 1 7-1 9-9 1 6044-1 1757 Receipt Acknowledged' ~ ..... Date' DISTRIBUTION: D&M Drilling Franzen Vendor Package(Johnston) NSK State of Alaska(+Sepia) 7 AL A OIL AND GAS OONSERVATIC~ OOMM, ,ION APPLICATION FOR SUNDRY AppROVALS 1. Type of Request: Abandon Suspend Alter casing ~ Repair well Change approved program 2. Name of Operator ARCO Alaska, Inc. 3. Address P. O. Box 100360, Anchorage, AK 99510 Plugging _ Pull tubing _ 5. Type of Well: Operation Shutdown_ Re-enter suspended well _ Time extension Stimulate Variance Perforate Other 6. Datum elevation (DF or KB) Development X Exploratory _ Stratigraphic _ Service 4. Location of well at surface 74' FSL, 216' FWL, Sec. 29, T11N, R10E, UM At top of productive interval 1490' FSL, 1035' FEL, Sec. 28, T11 N, R10E, UM At effective depth At total depth 1604' FSL, 284' FEL, Sec 28, T11N, R10E, UM (Proposed) 12. Present well condition summary Total Depth: measured 6,045' feet Plugs (measured) true vertical 4,143' feet RKB 130 7. Unit or Property name Kuparuk River Unit 8. Well number 1L-20X 9. Permit number 91-51 10. APl number 50-029-22157 11. Field/Pool Kuparuk River Field Kuparuk River Oil Pool Cement: 0-6,045' (Top Job Performed) Effective depth: measured 6,045' feet Junk (measured) true vertical 4,143' feet None Casing Length Size Structural Conductor 80' 16" Surface 6,045' 9 5/8" Intermediate 1 1,700' 7" Production Liner 1,200' 5" Perforation depth: measured true vertical Tubing (size, grade, and measured depth Packers and SSSV (type and measured depth) Cemented Measured depth True vertical depth 250 Sx AS I 115' 1 15' 825 Sx Perm E & 6,045' 4,143' 630 Sx Class G 300 Sx Class G 11,788' 5,992 125 Sx Class G ~ _ 12,610' 6,367 13. Attachments Description summary of proposal _ Detailed operation program ~ Set intermediate 7" casing due to increasing mud weights and lost circulation problems. 14. Estimated date for commencing operation ~15. Status of well classification as: April 11, 1991 [ Oil ~ Gas __ 16.If proposal was verbally approved Name of approver Date approved Service 17. I hereby_certify that the foregoing is true and correct to the best of my knowledge. FOR COMMISSION USE ONLY BOP sketch Suspended Conditions of approval' Notify Commission so representative may witness Plug integrity_ BOP Test_ Location clearance Mechanical Integrity Test _ Subsequent form Approved by the order of the Commission Form 10-403 Rev 06/15/88 '~equire 10-/¢c~ Approved Copy Returned ORIGINAL SIGNED BY LONNIE C. SMITH JApproval No. SUBMIT IN TRIPLICATE o , . . , . . . . 10. 11. 12. 13. 14. 15. 16. 17. 18. 19. 20. 21. 22. 23. 24. GENERAL DRILLING PROCEDURE KUPARUK RIVER FIELD 1L 20-X Move in and rig up Pool Rig 7. Install diverter system. Drill 12-1/4" hole to 9-5/8" surface casing point according to directional plan. Run and cement 9-5/8" casing. Install and test BOPE. Test casing to 2,000 psi. Drill out cement and 10' of new hole. Perform leak off test. Drill 8-1/2" hole to intermediate casing point (20' above top of Kuparuk) according to directional plan using Logging While Drilling (LWD) tools. Run and cement 7" casing. Pressure test to 3,500 psi. Change rams and test BOPE. Drill 6-1/8" hole to total depth according to directional plan. Log hole with wireline open hole logs.. Run and cement 5" liner. Clean out 5" liner. Displace hole.with brine water ND BOPE and install temporary production tree. Secure well and release Pool Rig 7. Run cased hole cement evaluation and gyro logs. Move in and rig up Nordic Rig 1. Install and test BOPE. Perforate and run completion assembly, set and test packer. ND BOPE and install production tree. Shut in and secure well. Clean location and release rig. Fracture stimulate well. Re-perforate and add additional perfs. ALASKA OIL AND GAS CONSERVATION COMMISSION April 8, 1991 WALTER J. HICKEL, GOVERNOR 3001 PORCUPINE DRIVE ANCHORAGE, ALASKA 99501-3192 PHONE: (907) 279-1433 TELECOPY: (907) 276-7542 A. W. McBride Area Drilling Engineer ARCO Alaska P. O. Box 100360 Anchorage, AK 99510-0360 Re: Kuparuk River Unit 1L-20X ARCO Alaska, Inc. Permit No. 91-51 Sur. Loc. 74'FSL, 216'FWL, Sec. 29, TllN, R10E, UM Btmhole Loc.1604'FSL, 284'FEL, Sec. 28, TllN, R10E, UM Dear Mr. McBride: Enclosed is the approved application for permit to drill the above referenced well. The permit to drill does not exempt you from obtaining additional permits required by law from other governmental agencies, and does not authorize conducting drilling operations until all other required permitting determinations are made. The Commission will advise you of those BOPE tests that it wishes to witness. Sincerely,___ ~hairman Alaska'~k~and Gas Conservation Commission BY ORDER OF THE COMMISSION dlf/Enclosure cc: Department of Fish & Game, Habitat Section w/o encl. Department of Environmental Conservation w/o encl. STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION PERMIT TO DRILL 20 AAC 25.005 I la. Type of Work Drill ;~ Redrill, I lb. Type of Well Exploratory Stratigraphic Test ~ Development Oil.2L Re-Entry Deepen.I Service Development Gas ~ Single Zone X Multiple Zone 2.. Name of Operator 5. Datum Elevation (DF or KB) 10. Field and Pool ARCO Alaska. Inc. RKB 130'. Pad 88' GL Kuparuk River Field 3. Address 6. Property Designation Kuparuk River Oil Pool P. O. Box 100360, Anchoracje, AK 99510-0360 ADL 25660, ALK 470 4. Location of well at surface 7. Unit or property Name 11. Type Bond (see 20 AAC 25.025) 74' FSL, 216' FWL, Sec. 29, T11N, R10E, UM KuDa, ruk River Vnit Statewide At top of productive interval (TARGET) 8. Well number Number 1490' FSL, 1035' FEL, Sec. 28, T11N, R10E, UM 1L-:~0X #U630610 At total depth 9. Approximate spud date Amount 1604' FSL, 284' FEL, Sec. 28, T11N, R10E, UM 4/1 1/91 $200,000 12. Distance to nearest 13. Distance to nearest well 14. Nmber of acres in property 15. Proposed depth (MD and TVD) property line 1 L-20 12,610' MD 284'@ TD feet 30' at SURFACE feet 2560 6,367' TVD feet 16. To be completed for deviated wells 17. Anticipated pressure (see 20 AAC 25.035(e)(2)) kickoff depth 300 feet Maximum hole angle 66° Maximum surface 2,179 psig At total depth frVD) 6,367' 3,545 psig 18. Casing program Setting Depth size Specification Tc~) Bottom Quantity of cement Hole Casing Weight Grade Coupling Length IVD TVD ND TVD linclude stage data/ 24" 16.0" 62.5# H-40 Weld 80' 35' 35' 115' 115' _+200 CF 12.25" 9.625" 36.0# J-55 BTC 6,070' 35' 35' 6,070' 3,680' 825 Sx Permafrost E & HF-ERW 630 Sx Class G 8.5" 7" 26.0# J-55 BTCmoc 6,070' 35' 35' 6,070' 3,680' 250SxClassG 8.5" 7" 26.0# J-55 BTC 6,540' 6,070' 3,680' 2,610' 6,367' Top 500' above Kuparuk 19. To be completed for Redrill, Re-entry, and Deepen Operations. Present well condition summary Total depth: measured feet Plugs (measured) true vertical feet Effective depth: measured feet Junk (measured true vertical feet Casing Length Size Cemented Measured depth True Vertical depth Structural Conductor Surface ~;~ * :~' !~ Intermediate :~.,~ ~ Production Liner ii i~.::';~'-.' ..: ,.:' ~ f'~ ~".,'~ Perforation depth: measured true vertical ~'~-i;i..' [)ii ~'' 20. Attachments Filing fee ~ Property plot ~ BOP Sketch ~ Diverter Sketch ~ Drilling program ~ Drilling fluid program ~ Time vs depth plot ~ Refraction analysis~ Seabed report ~ 20 AAC 25.050 requirements 21. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed ~ ./~~//~~ Title Area Drillin~ Encjineer Date / Commission Use Only Permit Number I APl number I A~ov/a~) date I See cover letter for ?/- ,~'/ so- ~_?'- ~ z./3' ? 8 / 91 other requirements Conditions of approval Samples required __Yes .~ N o Mud log required __ Yes.~, N o Hydrogen sulfide measures __ Yes ~ N o Directional survey required ;~Yes __ N o Required working pressure for BOPE __2M; ..~ 3 M' __ 5 M' __ I 0 M' __ 1 5 M Other: / by order of ^ppr Commissioner the commission Da~e Form 10-401 Rev. 7-24-89 it in triplicate IARCO ALASKA, Structure ' Pod 1L Well · 20X F_ield · Kuporuk River Unit Location · North Slope, Alaska Created by : jones For: M PRESTRIDGEJ JDate plotted : 4-Apr-g1 J I~Plot Reference is 20X Version t5. ICoordinotes ore tn feet reference slot t20X.~ Fl'rue Vertlcol Depths are reference wellhead.] I [-]~I]EASTMA N I / VJ~IICHRIS~SEN.,.___ I N 81 DEG 21 MINE 9416' (TO TARGET) SURFACE LOCATION: 74' F'SL, 216' F"WL SEC. 29, TIIN, RIOE · oo.oo E a st - - > 8000 800 1 §002400 3200 4000 ¢800 5600 6400 7200 8000 8~00 9600 t 0400 I I I I I I I I I I I I I I I I I I I I I I I I I I I I I TO LOCAI~ON: J 160*' FSL, 284' FEL SEC. 28, TllN, RIOE -24~ -1~0 I _ - ~o Z 0 o ! TARGET LOC~TION: J 1490' FSL, 1035' FEL SEC. 28, T1 1N, RIOE RKB ELEVATION: 1,,..~0' '" .,_.~ !~ v .~ ,.- KOP TVD=300 TMD=300 DEP=O ~ ~'" : ~ '~} f: ~: ";' ~r ~=15~ TMD=1610 0EP=364 · : ) ::~ z~ ; P'~. ;.2 _;'~:-~, ~¢" ~L-~' -' T/ W ~ SNDS ~=2980 ~D=4367 ~P=2660 ~ B/ W ~ SNDS ~=3~ ~D=5~4 DEP=3770 g 5/8"CSG PT ~=~680 TMD=~70 DEP=~21~ ~ K-lO ~=3940 ~D=6703 OEP=4790 AVERAGE ANGLE ~ 65 DEG 44 MtN ~ ~=5155 ~D=9660 DEP=7~86 TARG~ ~~25 TMD=I~7 DEP=9416 ~ T/ ZONE A ~=6185 TMD=12166 DEP=9771. ~ B/ KUP SNDS WD=6285 ~D=12~10 ~P=9993 ~ ~ / L~ ~ ~=6367 ~D=~2610 DEP=10175 I I I I I I I I I I I I I I I I I I I I I I I I I I Scale 1 ' ¢00.00 Vertical Section on 81.55 azimulh with reference 0.00 N, 0.00 E from slot J~20X 2OO 150 100 50 50 100 5O 0 50 I I. ....... 500 1300 300 100 I 150 700 200 250 300 350 I I I I '~0o ,,, _..- ----q ~oo I I I I 50 0 50 100 150 I 200 I 250 ! 3OO I 350 _ 200 _ 150 ) _ 100 50 _0 _ 5O _ 100 ~.~.':UPARUK RIVER Ul~,~: 20" DIVERTER SCHEMATIC 5 I ,, 6 4 3 2 DO NOT SHUT IN WELL UNDER ANY CIRCUMSTANCES MAINTENANCE & OPERATION , UPON INITIAL INSTALLATION, CLOSE PREVENTER AND VERIFY THAT VALVE OPENS PROPERLY. CLOSE ANNULAR PREVENTER IN THE EVENT THAT AN INFLUX OF WELLBORE FLUIDS OR GAS IS DETECTED. OPEN APPROPRIATE VALVE TO ACHIEVE DOWNWIND DIVERSION. ARCO ALASKA, INC., REQUESTS APPROVAL OF THIS DIVERTER SYSTEM AS A VARIANCE FROM 20AAC25.035(B) 1. 16" CONDUCTOR 2. SLIP-ON WELD STARTING HEAD 3. FMC DIVERTER ASSEMBLY WITH TWO 2-1/16"- 2000 PSI BALL VALVES 4. 20" -2000 PSI DRILLING SPOOL WITH TWO 10" OUTLETS. 5. 10" HCR BALL VALVES WITH 10" DIVERTER LINES, A SINGLE VALVE OPENS AUTOMATICALLY UPON CLOSURE OF ANNULAR PREVENTER. VALVES CAN BE REMOTELY CONTROLLED TO ACHIEVE DOWNWIND DIVERSION 6. 20" - 2000 PSI ANNULAR PREVENTER SRE 2'6; 7 6 I I 13 5/8" 5000 " CJl BOP STACK ACCUMULATOR CAPACITY TEST 1. CHECK AND FILL ACCUMULATOR RESERVOIR TO PROPER LEVEL WITH HYDRAULIC FLUID. 2. ASSURE THAT ACCUMULATOR PRESSURE IS 3000 PSI WITH 1500 PSi DOWNSTREAM OF THE REGULATOR. 3. OBSERVE TIME, THEN CLOSE ALL UNITS SIMULTANEOUSLY AND RE~ THE TIME AND PRESSURE REMAINING AFTER ALL UNITS ARE CLOSED WITH CHARGING PUMP OFF. 4. RECORD ON THE IADC REPORT. THE ACCEPTABLE LOWER LIMIT IS 45 SECONDS CLOSING TIME AND 1200 PSI REMAINING PRESSURE, BOP STACK TEST 1. FILL BOP STACK AND MANIFOLD WITH ARCTIC DIESEL. 2. CHECK THAT ALL HOLD-DOWN SCREWS ARE FULLY RETRACTED. PREDETERMINE DEPTH THAT TEST PLUG WILL SEAT AND SEAT IN WELLHEAD. RUN IN LOCK-DOWN SCREWS IN HEAD. 3. CLOSE ANNULAR PREVENTER AND CHOKES AND BYPASS VALVES ON THE MANIFOLD. ALL OTHERS OPEN. 4. TESTALL COMPONENTS TO 250 PSI AND HOLD FOR 10 MINUTES. INCREASE PRESSURE TO 3000 PSI AND HOLD FOR 10 MINUTES. BLEED TO ZERO PSI. 5. OPEN ANNULAR PREVENTOR AND MANUAL KILL AND CHOKE LINE VALVES. CLOSE TOP PIPE RAMS AND HCR VALVES ON KILL AND CHOKE LINES. 6. TEST TO 250 PSI AND 3000 PSI AS IN STEP 4. 7. CONTINUE TESTING AL VALVES, LINES, AND CHOKES WITH A 250 PSI LOW AND 3000 PSI HIGH. TEST AS IN STEP 4. DO NOT PRESSURE TEST ANY CHOKE THAT IS NOT A FULL CLOSING POSITIVE SEAL CHOKE. 8. OPEN TOP PIPE RAMS AND CLOSE BOTFOM PIPE RAMS. TEST BOq-rOM RAMS TO 250 PSI AND 3000 PSI. 9. OPEN PIPE RAMS. BACKOFF RUNNING JTAND PULL OUTOF HOLE. CLOSE BLIND RAMS AND TEST TO 3000 PSi FOR 10 MINUTES. BLEED TO ZERO PSI. 10 OPEN BLIND RAMS AND RECOVER TEST PLUG. MAKE SURE MANIFOLD AND MNES ARE FULL OF ARCTIC DIESEL AND ALL VALVES ARE SET IN THE DRILLING POSITION. 11. TEST STANDPIPE VALVES TO 3000 PSI. 12. TEST KELLY COCKS AND INSIDE BOP TO 3000 PSi WITH KOOMEY PUMP. 13. RECORD TEST INFORMATION ON BLOWOUT PREVENTER TEST FORM. SIGN AND SEND TO DRILLING SUPERVISOR. 14. PERFORM COMPLETE BOPE TEST ONCE A WEEK AND FUNCTIONALLY OPERATE BOPE DAILY. 1. 16" - 2000 PSI STARTING HEAD 2. 11' - 3000 PSI CASING HEAD 3. 11" - 3000 PSI X 13-5/8' - 5000 PSI SPACER SPOOL 4. 13-5/8' - 5000 PSI PIPE RAMS 5. 13-5/8' - 5000 PSI DRLG SPOOL W/ CHOKE AND KILL LINES 6. 13-5/8' - 5000 PSI DOUBLE RAM W/ PIPE RAMS ON TOP, BLIND RAMS ON BTM 7. 13-5/8" -5000 PSI ANNULAR SRE 8/2~89 DOYON 14 DRILLING FLUID PROGRAM (1L-20X) Spud to 9-5/8" surface casing Density PV YP Viscosity Initial Gel 10 Minute Gel APl Filtrate pH % Solids - 8.6-10.0 15-35 15-35 50-100' 5-15 15-40 10-12 9-10 10% + Drill out to wei~lht up 8.6-9.3 5-15 5-8 30-40 2-4 4-8 8-10 8.5-9 4-7% Drilling Fluid .System: Tandem Brandt Shale Shakers Tandem Derrick Shale Shakers Solids Processing System to minimize drilling waste Mud Cleaner, Centrifuge, Degasser Pit Level Indicator (Visual and Audio Alarm) Trip Tank Fluid Flow Sensor Fluid Agitators Notes' Weight up to TD 11.8 10-18 8-12 35-50 2-4 4-8 4-5 9.0-9.5 <10-12% Drilling fluid practices will be in accordance with the appropriate regulations stated in 20 AAC 25.033. Maximum anticipated surface pressure is calculated using a surface casing leak-off of 13.5 ppg EMW and a gas gradient of 0.11 psi/ft. This shows that formation breakdown would occur before a surface pressure of 2,179 psi could be reached. Therefore, ARCO Alaska, Inc. will test the BOP equipment to 3,000 psi. The nearest well to 1 L-20X is 1L-20. As designed, the minimum distance between the two wells wOuld be 30' at surface. The wells would diverge from that point. Excess non-hazardous fluids developed from well operations and those fluids necessary to control the fluid level in reserve pits will be pumped down the surface/production casing annulus of the last well drilled. That annulus will be left with a non-freezing fluid during any extended shut down (> 4hr) in pumping operations. The annulus will be sealed with 175 sx of cement followed by arctic pack upon completion of fluid pumping. *Spud mud should be adjusted to a FV between 100-120 sec/qt to drill gravel beds. e 1 1 . · 10. 11. 12. 13. 14. 15. 16. 17. 18. GENERAL DRILLING PROCEDURE KUPARUK RIVER FIELD 1L-20X ! Move in and rig UP Pool Rig 7. ~' Install diverter system. ~' Drill 12-1/4" hole to 9-5/8' surface casing point (6,070') according tol directional plan. Run and cement 9-5/8' casing.- Install and test BOPE. Test casing to 2,000 psi." Drill out cement and 10' of new hole. Perform leak off test to 12.5 ppg EMW. Drill 8-1/2" hole to logging point (12,610') according to directional plan. Run open hole evaluation logs.- Run and cement 7" casing. Pressure test to 3,500 psi. - ND BOPE and install temporary production tree. - Secure well and release drilling rig. ~ Run cased hole cement evaluation and gyro logs. '~ Move in and rig up Nordic Rig 1." Install and test BOPE. Perforate and run completion assembly, set and test packer. ND BOPE and install production tree. Change over to diesel. Shut in and secure well. Clean location and release rig. ** CHECK LIST FOR NEW WELL PERMITS ** ITEM APPROVE DATE [ 2 thru 8] [9 ~hru 1'3] [10 & 13] (4) Casg .~,,~,!,,v~, [14 thru 22] (5) BOPE [23 thru 28] (6) Other [29- thrU] 31] (6) Addl Company,/~ Lease & YES 1. Is permit fee attached ............................................... //~ . 2. Is well to be located in a defined pool .............................. _~_ 3. Is well located proper distance from property line ................... .. . 4. Is well located proper distance from other wells ..................... L 5 Is sufficient undedicated acreage available in this pool ............. 6 Is well to be deviated & is wellbore plat included ................... 7 Is operator the only affected party .................................. . .... 8 Can permit be approved before 15-da~':wait ............................ 1 10. 11. 12. 13. 14. 15. 16. 17. 18. 19. 20. 21. 22. 23. 24. 25. 26. 27. 28. 29. 30. 31. 32. Does operator have a bond in force .................................. Is a conservation order needed ...................................... Is administrative approval needed ................................... Is lease number appropriate ......................................... Does well have a unique name & number ............................... NO REMARKS - Is conductor string provided ......................................... Will surface casing protect all zones reasonably expected to serve as an underground source of drinking water .................. /~ Is enough cement used to circulate on conductor & surface ............ Will cement tie in surface & intermediate or production strings ...... ~. Will cement cover all known productive horizons ..................... Will all casing give adequate safety in collapse, tension, and burst. Is well to be kicked off from an existing wellbore ................... ~.~ Is old wellbore abandonment procedure included on 10-403 ............. Is adequate wellbore separation proposed ..... ~ ........................ Is a diverter system required ........................................ Is drilling fluid program schematic & list of equipment adequate ..... Are necessary diagrams & descriptions of diverter & BOPE attached .... Does BOPE have sufficient pressure rating -- test 'to ~o~o ~sig ..... Does choke manifold comply w/API RP-53 (May 84) ...................... Is presence of H2S gas probable ...................................... FOR EXPLOP~ATORY & STP~ATIGRAPHIC WELLS: Are data presented on potential overpressure zones ................... Are seismic analysis data presented on shallow gas zones ............. If offshore loc, are survey results of seabed conditions presented... Additiona! requirements ............................................. O "1" Z ~O geology' eng. i neer i ng~:. MTM,~' ECS ~,~,. DWJ=~____ ' RP~ BEWL RAD ~,-,,- JH rev 03/29/91 jo/6.011 IN'ITIAL GEOI UNIT ON/OFF POOL CLASS STATUS AREA ~ SHORE Additional remarks' Well History File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history file. To improve the readability of the Well History file and to simplify finding information, information, of this nature is accumulated at the end of the file under APPENDIX. No special'effort has been made to chronologically organize this category of information. ALASKA COMPUTING CENTER * ****************************** · ------- SCHLUMBERGER ****************************** fIELD NAME : KUPARUK RIVER BOROUGH : NORTH SLOPE APi NUMBER : 50-029-22157-00 REFERENCE NO : 74537 /!/~,,.~"' ,, _~ Date_ chlumberqer Alaska Comput~nq Center PAGEm **** REEL SERVICE NA~E : EDIT DATE : 91105/ 2 ORIGI~ REEL N~E : 74537 CONTINUATION ~ : P~EVIDUS ~E:EL : CO~TNT : A~CO ALASKA, I~C,,KUPARUK RIVER,II, - 20×,50-0~9-22~57-00 **~* TAPE NEADE~ ***~ SERVICE NA~E : EDIT DATE ~ 91/05/ ~ ORIGIN ~ FDIC TAPE NAME : 74537 CONTINUATION ~ ~ 1 PREVIOUS TAPE : COMMENT : ARCO ALASKA, INC,,KUPARUK RIVER,1L - 20X,50-029-22~57-00 **** FIDE HEADER **** FILE NA~E : EDI~ .00] SERVICE : FDIC VERSION : 001A06 DAT~ : 91/05/ 2 MAX REC SIZE F!L~ TYPE : bO LAST FILE ******************************************************************************* ** ** ** ** SCHLUMBERGER wELD SERVICES ******************************************************************************* ******************************************************************************* CONPAN¥ NAME: ARCO ALASKA, INC, WELL: IL - 20X FIELD: KUPqRUK RIVER BOROUGH: NORTN SLOPE STATE: ALASKA APl ~U~BER: 50-u29-22157-00 LOCATION: 74' SECTION: 29 LOG ~EAS,URED FRO;'~ ,RKf~ 129 RANGE: iOE Tame Verification Ll£tlnq ;chlU~,berc~er AlasKa ComputJ. nq Center 2-'~Y,, -1991. 22:59 PAGE: 2 ,~A~E~ LOGGED: TD DRTLLER: CASI['~G I: 27-APRIL-1991 i25]P 9 5/8" ~ DRILLER DEPTH OF 6045 7" 9 DRILLER DEPTH OF 11768 BIT SIZE 1: 12.25 BIT SIZE 2: 6.125 TYPE FLUID IN HOLE: GEL/DRISPAC DENSITY) 11.6 VISCOSITY: 56 PN: 10.2 FbUID LOS$) 4.2 MUD RESTSTIVITYt 3.11 ~ 64 FILTRATE RESISTIVITY~ ~.B5 ~ 64 M~)D CAKE RESISTIVITY~ ~.7t 9 64 TIME CIRCULATION ENDED: 01:00 4-27 ~AXIMUM TEMP RECORDED: 147 ~ T LO.,GING DTS RICT: LOGGI~G E~]GINEER: WITNESS: AMS AA 950 SGC SA 593 HLDC 20 HLDS 20 DlC 271 FIELD RE~ARKS: PRUDHOE BAY T. WES'~ ~{. STRICKLAND / J, RALL TCC B 839 CNC HA 332 HLDV 20 HLDP 20 DIS 276 TOOL STRING (BOT-TgP): D!TE'HLDT-C~L-GR-TCC-AM$. MO STANDOFFS USED O~ THE TOOLS, A,~D A 2 RUBBER HOLE FINDER AND A 2' ROLLOVER SLEEVE USED NEUTRO~t. { ~A~RIX-SAND,~ HOL~ CORRECTION:CALiPER, DENSITY MATRIX:2 6~ ~L3ID DE~SITY=I. DENSII. Y.HOL£ CORRECTION:NONE. DEVIATION OVE~ ~E LOGGING ~ONE IS ~PROX. 59 64 DEG. ~AX HOLE DEVIATION:69.2 DEG AT 9221' ~qD. THE TOOL WOULD NOT FAbb BEYOND 11844' MD DESPITE NUMEROUS ATTEMPTS. THE bOG WAS MADE FRO~ THAT POINT UP WITH ONLY THE DUAL IMDUCTIC~~ DEEP EMOt3GH TO SEE Ai~Y PAY SAND NO CNb OR HLDT DATA WAS PRESE~iTED SIi~CE THEIR SENSORS WERE ABOVE ~HE SAND, CLIENT ELECTED TO FORGO AP~Y FURTHEM LOGGING ATTC~PTS IN FAVOR OF CASED HOLE LOGS. D~TE dOB STARTED: ~-MAY-91 dOB REFERENCENO: 74537 LP~/ANA: S. DEES ,IS Ta~e Yerifl. catlon [,istiDq ~cblumberoer AlasKa Computing Center 2-~':A%-199 ! 22:5~ FILE - EDIT.DO1 ARC~ ALASKA I~C. KUPARUK RIVER 50-029-22~57-00 MAIN PASS LOG DATA FOR DTE FROM FIELD FILE .019 MAIN PASS LOG DATA GR IN CASING FROM FIELD FILE .019 D~TA SAMPLED EVERY -.5000 FEET DATA INCLUDED TOOL EXTENSION TOOL TYPE USED NA~E DIT-E ,DTE GR .CSG PMASOR DI~AL INDUCTION SFb GAMMA RAY ****************************************************************************** TAB;~E TYPE : CONS TUNI VALU DEFI TYPE CN WN APIN FI, SEC? TOW~ RANG COU~ STAT NATI LATT LONG WIT~ $0~ PLAT EPD APL ELF EGL TDD TDL ARCO ALASKA, INC. KUPARUK RIVER lb - 20X 50-029-22157-00 74' FSL & 216' FWL 29 ~OE NORTH SLOPE ALASKA USA Compan~ Name Field Name Well Name API Serial Number Field bocatioD Section Township Range County State or Province Nation Latitude Longitude w. STRICKhAND / J. RA WitLess' Name 548195 Service Order Number FT O. FT FT 129. FT FT 88 FT 12932. FT Permanent datum Elevation o~ Perm. Da Neasured From L°~VEAB PER~ANENT DATU~ Elevation of Kellv Bu Elevation of Derrick Elevation of Ground L Total DePth - Driller Total Depth - Logger ZONE Yertfication I.,I s $, J~ D{~ AlasKa Co~u[~na Center PAGE~ 4 '['Uv~I. VALU DEFI TYPE BLI FT 1~836. Bottom bo~ Interval TLI FT !000, Top Log Interval DFT GEL/DRISPAC Drilling Fluid Type. DFD C/C3 11,6 ~rllling Fluid Densit DFPN ' 10.2 Drilling Fluid Pn DFV CP 56 Drilling Fluid Viscos DFL F3 4-~ Drilling Fluid Loss R~S OHMM 3,11 Resistivity Of Mud Sa MST OEGF 64. Mud Sample Temperatur R~FS OHMM 2,85 Resistivity of mud fi ~FST DEGF 64 ~ud Filtrate Sample T R~C$ OHMM 3 ~ Resistivity of gud Ca ~CST DEGF 6~. Mud Ca~e Sample Tempe TCS 01:00 4-27 Time Circulation Stop STE~ DEGF -999.~5 Surface Temperature BHT DEGF 147, Bottom Hole TemDeratu TABLE TYPE : ZONE T~BLE TYPE : CURV DEFT CIDP IDPg CIL~ IFRE IDQF IMQ~ IIXD IIX~ SFLU SP ~T~ Depth Channel Name INDUCTION DEEP FHASOR CONDUCTIVITY INDUCTIO~ DEEP PMASOR RESISTIVITY INDUCTION ~EDIUS PHA$O~ CONDUCTIVITY INDUCTION MEDIU~ PHA$OR RESISTIVITY Deed Induction Standard Processed Conductivity Dee~ Induction Standard Processed Reststlvlt~ ~ed Qm Induction Standard Processed Conductiv ty gedium Induction Standard Processed Resistivity Induction Calibrated Fre~ues c~ IDQF DEEP INDUCTION QUALITY FACTOR I~QF ~ED INDUCTION OUAL!TY FACTOR ~eep Induction Real Intermediate Conductivity Deep Induction Quad Intermediate Conductivity gedium Induction Real Intermediate Conductivity Medium Induction Quad Intermediate Conductivity SFL Resistivity (unaveraged) Spontaneous otentlal Ga~,~a Ray Tension ~ud Tempe{ature ~UD Resistivity ,I$ Tape Verificat].on Listino ;cblumberger Alaska.Computing Center 2-i,lAY-1991 ~2:58 DEFI HTEN Head Tension GR Gamma Ray T~$ Tension M~ES ~UD~ Resistivity · ~TE~ ~ud Temperature HTE~ Head Tension PAGE{ $* D~TA FORMAT SPECIFICATION RECORD SET TYP~2 - 64EB ~* ...... ...... ---~----------~-- TYPE REPR ODE VA E ~mmmmmm~m~mm~mmmmm~mmmm~m~mm~m~m~m~m~ I 66 0 2 66 0 3 73 112 4 66 1 5 66 6 73 7 65 9 65 11 66 9 12 68 !,3 66 0 14 65 FT 15 66 68 16 66 1 0 66 0 ** s~ ~ - c.~. ** '""'" '"'" "'"'"' "'"" .~.~ s~'~. ~ oc~ ~" .~ ~i U.~T ~i~c~ ~ ';~ ~ ';~i'F'"'"'~ .o~'"'"" "'""~"'~ ' ID ORDER # LOG TYPE CLASS ~OD NUMB SAMP ELEM CODE (HEX) '5~.~'"'""'~'"~,~ ..... ~~" ..... oo 'gii"'"'"'"'~"oo o .... ~ '""'"'"",,'""'"",,,'~ ~ ooooooo CIDP DTE MMHO 548195 00 000 O0 0 1 1 1 4 68 0000000000 IDP~ DTE OHN~M 548195 O0 CIMP DTK ~0 548195 O0 IMPP OTf [)~M~ 5481g5 O0 CILD DTE N~HO 548195 O0 ILD DTE OHM~ 5481Q5 O0 CIb~ DTE ~MHO 548195 O0 IL~ DT~ 0~ 548~95 O0 IFRE DTE HZ 548195 O0 ID~F DTE 5~8195 O0 I~OF QTE 5481,95 O0 IIRD OTE MMHO 548195 O0 000 O0 0 1 I 1 4 68 000 O0 0 1 1 1 4 68 000 ©0 0 I 1 1 4 68 000 O0 0 1 1 1 4 68 000 no 0 i 1 I 4 68 000 O0 0 !, 1 ! 4 68 000 O0 0 1 1 I 4 68 000 O0 U 1, I 1 4 68 000 O0 0 1 1 1 4 68 000 O0 0 I 1 1 4 68 000 O0 0 i 1 1 4 68 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 0000000000 .IS Tape verification Listin~ ;cblUmberoer AlasKa ComDutinq Center 22:58 PAGE; ORDE~ IIXD DTE ~HO 5481 IIR~ DTE ~aO 548195 II×~ GTE ~aO 548195 SFLU PI~E OHN~ 548195 SP DTE ~iV 548195 GR DTE GAP! 548~95 TENS DTE LB 548195 ~TE~ DTE DEGF 548195 ~RES DTE OM~ 548195 MTEN DTE LB 548195 G~ CSG GaPI 548195 TE~$ CSG LB 548195 ~RES CSG OH~ 548195 MTE~ CSG DEGF 548195 --m-- {mmm..mmmm. ** DATA ** # LOG TY ......... ;'"3'"' .... 'l' ........ O0 0 0 0 0 1 O0 000 O0 0 1 O0 00o O0 0 1 O0 000 O0 0 O0 000 O0 0 O0 000 O0 0 1 O0 000 O0 0 O0 000 O0 0 O0 000 O0 0 1 O0 000 o0 0 O0 000 O0 0 O0 000 O0 0 1 O0 000 O0 0 1 O0 000 O0 0 1 PI API APl FI UMB N 8 IZE REPR OCESS PK CLASS ~'~OD ~-~.~-~a SAPP ELCM CODE (HEX) DEPT, 11937,500 I~P~,DTE 1,52.500 Ib~.DTE 146,625 IIRD.DTE 5.488 $~[.{t. DTE 316.500 M E~.DTE 146.000 TENS,CSG -999.250 DEPT. 11900 I~PH,DTE 152 IL~.DTE 146 IIRD,DTE 5 SFLU.Dj' TE 316 ~TE~.DTE 146 TENS.CSG -999 1 4 68 000000 ~ ~ 68 oooooooooo I 4 68 0000000000 ~ 4 6~ oooooooooo , ~ 6~ oooooooooo , , ~8 oooooooooo 1 4 68 0000000000 ~ 4 ~8 oooooooooo ' 4 68 0000000000 , ~ ~ oooooooooo I 4 68 0000000000 ~ 4 6~ oooooooooo i 4 68 0000000000 ! 4 68 0000000000 ' ~ ~ ooooo2~o CIDP.DTE 5.605 IDPH.DTE CILO.DTE 5.992 ILD.DTE IFRE,DTE 20,000 IDOF,OTE IIXD,DTE ~,906 IIRM'DTE SP.DTE -15 .875 GR.DTE ~RES DT~ ' 1 273 HTEN DTE ~R~:,.$.CSG 999:250 ~TE~,CSG 500 SP DTE '15 . 5 GR,DTE 000 ~RE$.' 250 ~RES'DTE 1. ) HTEN'DTE .CSG -999. 0 ~TE~,CSG DEPT, 11800,000 I~PH,DTE 4.063 IL~.DTE 4,402 IIRD.DTE 97.250 SFLU.DTE 2~902 NTE~.DTE 146,125 TENS.CS~ 3025.000 DEPT. 11700,000 I~PH.DTE -999.250 IL~.DTE -999.250 IIRD.DTE -999.250 SFLI},DTE -999,250 ' ~' DTE -999.250 TENS.CSG 4855.000 CIDP.DTa 101.375 IDPH.DTE CILO.DTE i0~,438 ILD,DTE IF.RE,DT~ 2 ,000 IDOF,DTE IIXD,OTE 27,703 IIRM.DTE SP.DTE 81.000 GR~OTE ~RE$.DTE 1.28! HTEM.DTE M~ES'CSG 1.322 MTEi~.CSG CIDP,DTE i999,250 IDPH,OTE CILD.DTE 999'250 ILD,DTE IFRE.DTE 999,250 iDOF.DTE IIXD.DTE '999.250 'IIR~4,DTE SP.DTE -999.250 GR.DTE ~RES.DTE -g99.250 HTEN,DTE :~RES,CSG 1.~68 ~iTE~.CSG !78 25O 166 750 3 000 6 496 103 500 133.875 '999,.250 178,250 166,750 3.000 ~:496 10 5OO 140'500 -999,250 9.852 9.852 0.000 2!3.125 !31.125 764 000 144:750 -999.250 -999 250 -999~250 -999.250 -999.250 -999.250 144.875 CIMP.DTE CILM DTE IMOF:DTE IIXM.DTE TENS.DTE GR,CSG HTEN.CSG CIMP.DTE CIb~.DTE IMQF.DTE IIX~.DTE TENS.DTE GR.CSG HTEN.CSG CIMP.DTE ClLM.DTE IMOF.DTE IIX~ DTE TENS:DTE GR.CSG HTEN.CSG CIMP,DTE CIb~,DTE IM@F,DTE IIXM.DTE TENS.DTE GR.CSG HTEN.CSG 6 555 6 816 2 000 ooo'° -999 250 -999 250 6,555 16 000 t02 000 -999' 0 246,000 O0 ~:gooo 21,5~1 4500'0 0 -999 250 -999 250 -999 2:50 -999 250 -999 250 73 813 688 000 ~chlum~er~er AlasKa Computln~ Center · DEPT. 1 ~ 600. 000 CIDP DTg -999 250 IDPH, ~TE 999 250 CI~P DTE IMPP.DTE -999 25~. CILD.DTE -999:250 !LD, D'rg 999.250 CILM.DTE I b.~".. DTE -'999.250 IF~E.DTE -999,250 IDOF,DTE -999.250 IMQF.DTE IIR~'.DTE -999.250 II×D.DTE -999.250 IIR;q,DTE -999.250 IIX~.DTE SFLU.DTE -999,250 SP.DT~ -999,~50 GR.DTE -999,250 TENS.DTE MTE~'~, DTE -999,250 ~4RES.DTE -999.250 ~TK~, DTE -999.250 GR.CSG TFN~.CSG 4950,000 ~RES.CSG 1,2~4 ~TE~.CSG 144,125 HTEN.CSG .DEPT. 000 CIDP DTE -999 250 IDPH,DTE 999,250 CI~P,DTE I~P~.DTE 99~.25. CILD, T' . ~ DYE -999:250 ILD,DTE ~999.250 CIL~,DTE IL~"DfE -999,250 ItXO DTE -999.250 XIR~:DTE 999,250 IIXM.DTE DTE -999,250 IFRE,D~..~. -999 250 IDQF DTE -999,250 IMOF,DTE IIRD, . . SFLU.DTE -999.250 SP.DTE -999,250 GR,DTE -999.250 TENS DTE ~TE~,DTE -999.250 i~RES.DTE '999.250 HTEN.DTE -999,250 GR~CSG TEN$.CSG 4870,000 ~RES.CSG 1,289 MTE~Z,CSG 143.500 HTEN,CSG DEPT, 11400,000 CIDP.OTE -999,250 IDPH,DTE -999.250 CIMP.DTE I~PH.DTE -999,250 CILD.DTE -999,250 ILD,DTE -999.250 CILM.DTE IL~ DTE -999,250 IFRE,DTE -999 ~50 IDQF DTE 999 ~50 IMOF DTE IIRD' ' ' .... ' .DTE -999,250 IIXD,DTE -999.250 IIR~,DTE ~999~250 IIX~,DTE SFLU.DTE -999,250 SP.DTE -999 250 GR,DTE -999,250 TENS,DTE MTEM.. .DTE -999,250 ~RE$,DTE -999:250 HTE~,DT' .... m 999~250 GR,CSG TE~q... CSG 4730 000 ~RES,CSG 1.300 MTE~,CSG 14~.625 HTEN.CSG DEPT i1300,000 CIDP,DTE -999,250 IDPH DTE -999.250 CIMP,DTE IMP~:DTF. -999,250 CILD,DTE -999,250 ILD:DTE 999,250 CIL~.DTE IL~,DTE -999,250 IFRE,DTE -999,250 IDQF,DTE ~999,250 IMQF D.TE IIRD, DTE -999,250 IIXD. DTE -999,250 IIRM,DTE -999,250 IIXM,DTE' SFI.~: DTF. -999,250 SP DTE -999.~50 GR,DTE -999,250 TF.NS DTE MTE~DTE -999,250 MRE$:DTE -999, 50 HTEi'~.DTE -999~250 GR:CSG TENS.CSG 4680,000 ~RES.CSG 1.296 MTE~,CSG 141.]75 HTEN.CSG DF. PT. 1~200.000 CiDP,DTE -999.250 IDPH,I)TE I~P~.DTE -999,250 CILD,DTE -999.250 IbD,DTE IL~.DT~ -999.250 IFRE,DTE -999,~50 IDQF"DTE IIRD.DTE -999.250 IIXD, DTF. -999.250 IIR~,DTE SFL~J DTE -999,250 SP.DT~ -999.250 GR,DTE MTEN:DT~ -999,250 HRES..DTE -999.250 HTEN,DTE ~ .... NS CSG 4635.000 MRES.CSG 1,296 MTF.M,CSG DEPT. 11100,000 CIDP.DTE -999,250 IDPH,DTE I~PN.DTE -999.250 CILD,DTE -999.250 ILD,DTE !L~,D~ -999.250 IFRE,DTE '999,250 IDQF,DTE IIRD.D E -999,250 IIXD.DTE -999,250 IIRM.DTC SFLU DTF -999,250 SP DTE -999 250 GR DTE MTE~'DTE -999,250 MRES.DTE '999,~50 HTEN,DTE T~NS.CSG 4595.000 ~RES,CSG 1.316 ~TE~,CSG DEPT 11000.000 CIDP.DTE -999.250 IDPH,DTg I~P~'DTE '-999,250 CILD,DTE -999,250 I[.D.DTE IL!~DTE -999,250 IFRE.DTE '999,250 IDQF DTE IIRD,DTE ..... -999.250 IIXD,DTE -999.250 II~l' , DTE oFL...DTK= ~ -9 99. 250 SP.ETS. -990.250. GR,DTE MTE~.DTE -999.25{"} MRE$.DTE '999,250 HTEN,DTE -999 250 -999 250 -999 250 -999 250 -999 250 -999 250 140 875 -999 250 -999 250 -ggg 250 -999 250 -gg9 250 -999 250 i40 000 -gg9 250 -999 250 -999 ~50 -999 250 -999 250 -999'250 CIMP.DTE CIbM,DTE IMQF,DTE IIXM,DTE TEN$,DTE GR,CSG HTEN.CSG CI~P,DTE CILM.DTE IMQF,DTE IIXM.DTE TENS,DTE GR,CSG HTEN,CSG CI~P.DTE CILM.DTE I~QF,DTE IIXM,DTE TENS.DTE GR,CSG -999.250 -999'250 -999,250 -999,250 -999.250 78,438 695,000 '999,250 '999,250 '999,250 '999'250 '999,250 122.563 686.500 -999 250 -999 250 -999 250 -999 250 -999 250 175 875 740 000 50 '999,~50 -999, "999,250 -999,250 149, 0 67~,000 -999,250 -999~250 ~999,2 0 999,250 159,000 675,500 "999 250 ~50 g 9 250 -999 250 138 500 699 000 '999,250 "999"250 "999,250 '999.250 '999,25.0 97',000 ,IS Tape verification ListJn<~ 2-~AY-lg91 2~:58 PAGE: 8 Ichlu~ber~er AlasKa ComDutinG Center TEt~S.CSG 4585,000 ~E$.,CS(; 1,3~1 MTEM.CSG 139.250 HTEN.CSG 691,00.0 DEPT. 10900,000 CIDP [)TM -999 250 IDPH.DTE -999.250 CIMP.DTE -999 250 I~P~.D~.~~- ~ -999.250 CILD~OTE -999.250' "ILD.DTE -999.250 CIL~.DTE -999:250 IL~.DTE -999,25o IFRE,!)TE -999.250 IDQF.DTE -999,250 I~QF.DTE -999.250 IIRD.DTE -999,250 IIXD.DTE ~999 250 IIRM.DTE 999.250 IIXM.DTE '999.250 SFL~.DTE -999.250 SP.DTE 999~250 GR.DTE ~999.250 TEN$.DTE '999~250 ~TE~.DTE -999,250 M~ES.DTE -999.250 ~TE~,OTE -999.250 GR.CSG 85.4~8 TE~S.CSG 4560.000 ~RES.CSG 1.338 ~TE~.CSG 138.250 HTEN.CSG 671,000 DEPT. 10800,00,~ CIDP.DTE -999.250 IDPH,DTE 999,250 CIMP.DTE I~DN.DTE -999.250 CILO,DTE '999 250 ILD.DTE ~999. 250 CIL~.DTE IL~.DTE -999.250 IFRE.DTE -999~250 IDQF, DTE 999 250 IMOF,DTE SFLU.DTE -999.2..u SP DTE 999 250 GR,DTE -999 250 TENS DTE TEas'MTE~ DTE -999.250 MRES.DTE 999 250 HTEa. DTE. -999 250 GR CSG .CSG 4595,000 MRES.CSG 1.331 MTEM,CSG 138:125 HTEN CSG DEPT. I0700.000 CIDP.DTE '999.250 IDPH.DTE -999.250 CIMP.DTE I~PH.DTE -g99,250 CILD.DTE -999.~50 I~D,DTE -999 250 CILM.DTE IL~.D~E -999,250 I~RE.DTE -999. 50 IDOF,DTE -999~250 IMOF.DTE IIRD.D E '999,250 IIXD.DTE '999250 IXR~,DTE '999.~50 IIX~ DTE SFLU DTE '999.250 SP,DTE '999i250 GR,DTE -999. 50 TENSiDTE ETE~'OTE '999.250 ~RES.DTE '999250 HTEN,DTE '999,250 GR CSG TE~S:CSG 4505.000 ~RE$,CSG 1,375 MTE~,CSG 137,125 HTEN.CSG DEPT. 10600,000 ClDP.DTE '999.250 IDPH,DTE -999 250 CIMP.DTE Ih~ DTE -999.250 IFRE, T'~ . I~QF.DTE DTE -99 50 1DO DTE 999 250 IIRD~OTE -999,250 IIXD,DE '99~,~50 IIRM,DTE -999.250 IIX~,DTE SFLU DTE 999,250 SP.DTE '99 , 50 GR, .~ · · DTE -999 50 TEN$,DTE ~TEE.OTE ~999,250 ~RES.DTE '999,250 HTEN,D' ~T'''~ -999.~50 GR.CSG TENS.CSG 4465'000 MRES~CSG 1.376 ~TEM,CSG 135.625 HTEN.CSG DEPT. 10500,000 ClDP,DTE '999.250 IDPH,DTE I"P"..DTEiL,~.DTE. ~999,250999,~5Au CILQ,DTEiFRE.DTE -99'99i'250250 IDOF,DTEILD'DTE IIRD.DTE 999.250 IIXD.DTE -99 ~250 IIRM,DTE SFL[~.DTE.. -999.250. SP.DTE -999.250 GR, D'fE MTE~,DTE -999,250 tgRE$. DTE -999,250 HTEN,DTE TEN$.CSG 4340,000 ~RES.CSG 1,374 MTE~,CSG DEPT. 10400,000 CIDP.DTE I~..,.DTE~ '999,250. CILD.DTE iiRD.)TE '999,250 IFRE.DTE .DTE '999.250 IIXD.DTE SFLI!.DTE '999,250 SP.DTE MTE~.OTE '999,250 ~RES.DTE TENS.CSG 4490'000 ~RES.CSG '999 250 '999 250 '999 250 '999 250 '999 250 '999 250 1.36~ DEPT. I0300.000 CIDP.DTE -999.250 I~PP,DYiL~ DrE .... ,-999,250 CILO,DTE -999,250 . ' ..999.250 iFRE.DTE_ -999,250 IIRD DTE -999.250 IIXD.D E '999.250 SFL~): DTE '999,250 8P, OTC '999,250 IDPH,DTE ILD,DTE IDOF,DTE IIRM.OTE GR,DTE H~EN DTE .CSG !DPH,DTE TOTE IbD'DT~ iDQF, . IIRM,DTE GR,DTE -999 250 -999 25O -999 25O -999 250 -999 250 -999 250 -999.250 -999,250 -999,250 -999.250 -999.250 -999.250 133.500 -999 25O -999 250 -ggg 250 -999 250 -999 250 CI~P.DTE CILM.DTE IMOF DTE IIXM:DTE TENS,DTE GR.CSG ~TEN.CSG CIMP.DTE CILM.DTE I~QF.DTE IIXM.DTE TENS,DTE GR,CSG HTEN,CSG CIMP.DTE ClLM,DTE IMQF,DTE IIXM.DTE TENS.DTE '999 250 -999 250 ~999 250 -999 250 -999 250 106 500 708 000 -999,250 :999,250 .999,250 999,250 -999,250 85,188 698,000 '999.,250 :999;250 999~250 -999,250 -999 250 97 5 -999,250 '999,250 -999,250 -999,250 -999,250 118,438 665,500 '999,250 '999'250 '999,250 '999,250 ~999,250 ~01,063 7~6,000 '999,250 '999,250 :999,250 999,250 -999,250 TaPe ver~ficatlon L1. st~n9 2-~A¥-199! 22:58 PAGEI 9 .chlumt. erqer AlasKa Comput~n~ CeDter ' MTE~. OTE -999.250 ~RES. [)TE -999.250 HTEN. DT~: -999.250 GR.CSG 100 813 TENM.CSG 4~95.()00 ~'4RE$. CSG 1.378 ~TES~, CSG 132.250 HTEN.CSG 729:000 DEPT. 10200.000 CIDP.DTE -999.250 IDP~,OTE -999.250 CIMP.DTE -999,250 I~P~.DTE -999.250 CILD.DTE -999.250 ILD,DTE -999.250 CILM.DTE -999'250 IL~ DTE -999~250 IFRE.DTE -999 ~50 IDQF,DTE -999 250 I~OF.DTE -999,250 IIRD'DTE. -9q9~ .250 IIXD.DTK -999~250 IIR~.DTE -999:250 IIXM,DTE -999,250 SFLU.DTE -999.250 SP.~TE -999,250 GR,DTE -999.250 TEN$.DTE -999,250 ~TE~.DTE -999,25(3 ~RES.DTE -999.250 MTEN,DTE -999,250 GR.CS~ ~6,625 TEMS.CSG 4195.000 ~RES.CSG 1.38] ~TE~.CSG 13~.750 HTEN.CSG 702,500 DEPT. 10100.000 CIDP.DTE -999 250 IDPH,DTE -999.250 CI~P.DTE -999,250 I~PH.OTE -999.250 CILD.DTE -999:250 ILD,DTE -999.250 CILM.DTE -999,250 ILM.DTE -999.250 IFRE.DTE ~999,250 IDQF.DTE -999,250 IMOF.DTE -999,~50 IIRD.DTE -999,250 IIXD,DTE 999.~50 IIR~,DTE -999.250 IIXM.DTE -999,250 SFLU.DTE -999,250 SP.DTE ~999,250 GR,DT~ -999.250 TEN$.DTE -999'250 MTE~.DTE -999,250 ~RE$.DTE 999~250 ~TE~.DTE -999.250 GR.CSG TEN$.CSG 4310.000 ~RE$.CSG ~.399 ~TE,q,CSG 130.375 HTEN.CSG 76~,000 D~PT. 10000. IMPN,DTE -999 IL~.DTE -999 IIRD.DTE -999 SFLU.DTE -999 MTE~.DTE -999 TENS.CS(; 4170. DEPT ggo0, IMPH:DTE -999. IL~. OTE -999. IIRD. DTE -999. SFLU. DTE -999, MTE~ DTE -999, TENS:CSG 4125, 000 CIDP,DTE -999,250 IDPH,DTE -999.250 CIMP DTE 250 CILD.DTE '999,250 ILD,DTE -999.250 CILM:DTE 250 IFRE,DT~.~ '999.250 IDOF,DTE -999.250 IMOF DTE 250 IIXO.DTE '999.250 IIR~,DTE -999.250 IIX~:DT~ 250 SP.DTE 999,250 GR,DTE -999.250 TEN$,DTE 250 ~RE$,DTE ~999.250 HTE~ DTE -999'250 GR.CSG 000 ~E$ CSG 1.406 MTE~!' · . ,CSG 129.250 MTEN.CSG 000 CIDP.DTE '999.~g IDPH,DTE -999~250 CIMP.DTE 250 CISD,DTE -999. ISO.DTE -999 250 CIS~.DTE 250 IFRE.DTE '999.250 IDQF,DTE -999i250 IMQF.DTE 250 IIXD.DTE '999,250 IIR~,DTE -999 250 IIXM,DTE 250 SP,DTE ~999.250 GR,DTE -999,250 TENS,DTE 250 MRES.DTE 999'250 HTEN,DTE -999,250 GR.CSG OOO ~RE$.CSG 1.429 MTEM,CSG 128.375 HTEN.CSG DEPT 9800,000 CIDP,DTE I~P~'DTE -999,250 CILD,DTE IL~DTE -999~250 IFRE.DTE IIRD.DTE -999,250 IIXD.DTE SFLI!.DTE -999,250 SP.DTE MTE~.DTE -999,250 MRE$.DTE TEN$.CSG 4150,000 ~RES.CSG '999 250 -999 250 -999 250 '999 250 -9gg 250 '999.250 1.454 DEPT. 9700.00{) CIDP DTE '999,250 IMP~.DTE -999,~5[ CILD,DTE 999.250 IL~.DTE -999,250 IFR~.DTE '999,250 IIRS.DTE -999,250 IIX~ .DTE -999, ~'50 SFLU,DTE -999.250 SP.DTE '999.~50 ~TF~.DT~ -999'25~) ~RE$,QTE '999.250 TMN$.CSG 4080'000 ~RE$.CSG 1.4~3 DEPT 9600,000 CZDP.DTE '999.250 t~P[4'~TE~. ~999,250 C~iLO,~ DTE -99q.~50 IL~:DTE 999.250 IFRC.DTE -999.250 IIRP.DT~ -999.250 it×~.DT~ -999.~50 IDPH,DTE -999,250 CIMP,DTE IbD,DTE -999,.250 CILM,DTE IDOF,DTE -999.250 IiRM.DTE -999,250 IIX~,DTE GR,DTE -999.250 TEN$.DTE MTEN,DTE -999.250 GR.CSG MTE~,CSG i27.438 HTEN,CSG IDPg,DTE IbD,DTE IDQF.OTC IIR~,DTE GR,DTE HTEN.DTE MTE~,CSG IDPF{,OTE ILD,DTE IDOF,DTE IIRM,DYE -999 250 -999 250 -999 250 -999 250 -9gg 25O -999 250 127.18B -999.250 -999 250 -999!250 -999 250 CI~P.DTE CILM.DTE IMQF.DTE IIXM.DTE TENS.DTE GP.CSG HTE~.CSG CI~P.DTE CIL~.DTE I~OF.DTE II~M.DTE -999 0 '999 -999 IlO 875 685 000 -999,25~ '999, '999, 50 '999, 8 116,~;0 714,500 ~999,~ 0 99 ~0 -99 68 500 '999,250 '999,250 '999' '999,2~0 44,188 691.',000 '999,250 '999,250 '999'250 '999,250 2-~AY-199~ 22:58 PAGgl 10 SFL[~. DTE -9qB, 250 SP. DTg TE~,;S.CSG 4105,000 .~!RES. CSG DFPT. 9500.000 CIDP,DTE I~PN.DTE -999,250 CILD,DTE IL~.DTE -999.250 IFR~.DTE IIRD.DTE -999.250 II×O.DTE SFLU.DT~ -999.250 SP.DTE ~TE~.DTE -999,250 ~RMS.DTE TE~qS.CSG 4115.000 ~RES.CSG 999 250 GR,DTE -999.25(> -'999: 250 H~E~. aTE -999. 250 -999 250 IPPH.PTE -999.250 -999i250 ILD.D~E -999.250 -999 250 IDQF,OTE -999,~50 -999.250 IIRM,DTE -999.250 '999,250 GR.DTE -999.250 -999.250 HTEa.~TE -999.250 1,434 ~TEM,CSG 125.500 DFPT. 9400,000 CIDP,DTE '999.250 IDPH,OTE IS~,DTE -999,250 IFRE,DTE 2999, 0 ID~F,~TE I~RP DT~ -999.250 IIXD DT~ .999,~0 IIR~,DTE SFLi~'~TE -999 250 SP~DTE -999, 0 GR,DTE MTE~:DTC -999:250 MRES'DTE -999,250 HTEN;DTE TE~M.CSG 40~.0.00© ~RES.CSG 1.458 MTE~,CSG DEPT !300,000 CIDP,[TE I~PH. DTE 999,250~ CILD,.T"DTE IL.~.DTE 999.250 IFRE.D~E SFLU,DT.~, :999.250 MTE~...DTE 999,250 MRS$:DTEE DTE TENS.CSG ;005,000 ~RE i CSG$~ DEPT. ~200 000 CIDP ~T~,~ I~PH.D"E ' ~.~ 999.250 CILD.DTE IL~,DTE '999.250 IFRE,DTE IIRD.DTE '999.250 IIXD,DTE SFL~!.OTE -999.250 SP,DTE MTEM.DTE ;999,250 ~RE$.DTE TENS.CSG 945.000 MRES,CSG DEPT.I.~. !iO0,OO0 CIDP,OTE ~? DTE 999.250 CILO.DTE ~'DTE 999,250 ., IIRD.DTE !999.250 IIXD,DTE SFLU.DTE 999,250 SP.DTE MTE~.OTE 999,250 MRES.DTE TENS.CSG 3880.000 MRES.CSG DEPT. 9000.000 CIDP.DTE I~P~.DTE -999.250 CILD,DTE IL~.OTE -999.250 IFRE.DTE IIRD.DTE -999.250 IIXD,DTE 8FLU.DTE -999.250 SP.OTE ~T~ OTE -999.250 MRES.DTC TE~'~S:CSG 3860.000 ~RES.CSG ~!9ii250 IDPH,OTE 9 250 ILO DTE 9 250 IOQF:OTE 999.250 IIRM,D'.E 999,250 GR,DTE 999.250 HTEN,DTE ~,497 MTEM,CSG 99 250 IDPH 99 ~250 ILD, DTE 999.250 IDQF,D'.E 999.250 IIRM,DTE '999.250 GR,OTE '999,250 HTEN,OTE 1.466 ~TE~,CSG '999 ~50 "99g 50 '999 250 '999 250 '999 250 '999.250 ~.492 ~999,250 999.250 '999'250 '999,250 '999.250 '999.250 1.494 IDPH.DTE ILD.DTE IDQF.OTE IIRM.DTE GR.DTE HTEN.OTE ~TE~,CSG IDPH.OTE ILD.DTE IDQF,DTE IIRM.DTE GR.OTM HTEN.OTE ~TE~t.CS~ -999.250 -999.250 -999.250 ~999. 0 -999.250 ~24.750 -999 ~50 -999 50 -999 250 -999 250 -999 250 -999 250 123 875 999.250 999,250 999,250 -ggg 250 -999 250 -999 250 123 125 -999'25~ -999:25 -999~250 -999.250 -999.250 -999.250 t22.125 '999.250 -999 25O '999!250 '999 250 -999 250 '999.250 121.313 TENS.DTE GR.CSG HTE~:.CSG CIMP.DTE CILM.DTE IMQF.DTE IIX~.DTE TENS.DTE GR.CSG HTEN.CSG CIMP,DTE CILM.DTE IMQF.DTE IIX~.DTE TENS.DTE GR.CSG HTEN.CSG CIMP,DTE CILM.DTE I~QF.DTE lIX~ DTE TENS DTE GR CSG HTEN,CSG CI~P,DTE CILM.DTE I~QF.DTE IIXM.DTE TEMS.DTE GR.CSG HTEN.CSG ClMP.DTE CIL~ DTE I.~QFiDTE IIXM DTE TENS DTE GR!CSG HTEN CSG CIMP.DTE CILg. DTE IMQF*DTE IIXM.DTE TENS.DTE GR.CSG HTEN.CSG -999 250 68 000 '999.250 '999,250 '999.250 '999.250 '999.250 ~16.750 681,000 '999,250 '999.250 '999'250 '999,250 '999,250 95,813 6B6,500 '999.250 '999'250 :999'250 .999, 50 999.'~50 85,313 678.000 '999,~50 '999, 50 '999,250 '999,250 '99~,250 4 ,906 690,500 -999 50 -999 '999 250 -999 2'50 '999 250 '999.250 '999.250 -999,250 '999,250 '999,250 64,250 694.000 .IS Ta~e verification Listfnq 2-:~AY-1991 22:58 PAGE: ;cblumberqer AlasKa ComDut%nq Cemter DEPT. 8900.00~) CIDP.~JTE -999.25!3 t'DPH. DTE -999.250 CI~P.DTE I.U P~. D~E -999.250 CILD.DTE -999.250 ILi).DTE -999.~50 CIL~.DTE I~"..~. F~ -9~9.~5o. IFRE.DTE. -999 250 IDQF.DTE -999.~50 I~QF.DT~ II8~..DTE -999,~50 II×D.DT~ -999.'250 IIR~ DTE -999 250 II×M DTE SFLU. DTE -999,250 SP.DTE -999. 250 GR' ' ' NTE~.. DTE -999.250 ~RES.[)TE -999.250 HTEN'DTE,DTE -999.250'999'~50 TENSGR;csGDTE TE~'~!S. CSG 3785.000 ~RES.CSG ]..534 ~%TE:'q, CSG ~20.688 HTEN.CSG DEPT. 8800.000 CIDP.DTE -999,250 IDPH,OTE -999.250 CI~P.DTE IMP~.DTE -999,250 CILD.DTE -999~250 II..D,DTE -999.250 CILM.DT~ ILP.OTE -999.250 IFRE.DTE -999.250 IDQF,DTE -999.250 I~QF,DTE I!Rn. DTE -99~,250 IIXD,DTE -999.250 IIR~i,DT£ -999 250 IIX~.DTE SFLU.DTM -999,~50 SP.~TE -999,250 GR.DTE -999:250 TENS DTE MTM~,DTE -999, 50 ~RES.DTE -999.250 HTE~.DTE -999 250 GR:CSG TENS.CSG 3780.000 ~RES.CS~ 1.535 MTE~'~... CSG 119"~25. MTEN.CSG ,00.000 CXD . T 2999 IIR~ OTE '999,250 IIXO.D~E -999. SFLI~'DTE.. -999,250 SP,[~.) ' ~ -999. ~TE~. DTE -999,250 ~RE$.DTE '999. T~NS.CSG 3750,000 ~E$.,CS.G DEPT. 8600,000 CIDP.OTE '999. IgPH.DTE -999,250 CILD,DTE '999 IL~.DTE '999,250 IFRE. j DTE '999~ IRD.DT~2 '999.250 IIXD.[TE '999. FLU,DTE 999,250 SP.DTE -999. ~TE~.DTE ~999,250 ~RE$.DTE '999. TE~S.CSG ~745~000 ~RES.CSG DEPT, ~500,000 CIDP.DTE '999 I~PH DTE 999.250 CILD.DTE -999 I5~'DTE -999 250 IFRE DTE -999 IIR~'~. ,]~E ~ ' -999,250 IIXD.DTE -999 SFL~).DTE -999,250 SP,DTE -999 ~TE~'DTE -999.250 ~RE$.DTE -999 TEN$,CSG 3745.000 ~RES.CSG 1. DEPT. 84)0, .~ '( 000 CIDP,DT~ -999. I~PFi,DTE -999,250 CILQ,DTE -999. IL~.DTE -999,250 IFRE,QTE -999' IIRD.DTE -999.250 IIXD,DTE ~999. SFLU.DTE -999.250 SP.DT~ .999. MTE~,DTE -999.250 MRES,DTE -999, TENS.CS(' .... ~ 37~5.00¢) ~RES.CoG DEPT. 8300.000 CIDP.OT~ -99~, I~P}'! DTE -999 250 CILD liTE -999. .DTE -99~,250 '[FR~.D~ -999. IIRD.DTE -999,250 IIXD.DTE -999. SFLU,DTE -999.250 SP.DT/ -999. MTE~.~TE -999.250 ~RES.DTE -999. TEN$.CSG 3635.00(~ ~RES.CSG 1, ~50 ILD,.DTE 99 250 CIbM.DTE 250 IDQF,DTE ~199 250 IMQF.DTE 250 IIR~,DTE 9~ 250 IIXM,DTE 250 GR,DT£ -99 25.0 TENS.DTE 250 ~TEi~,DTE -.999.2~0 GR.CSG 555 MTEM,CSG 118.688 HTEN,CSG 250 IDPH,DTE 250 ILD,DTE 250 !DQF,DTE 250 IIRN~DTE 250 GR.DTE 250 HTEN,DTE 521 MTEH,CSG 250 IDPH.DTE IDQF.,DTE 250 IIRM,DTE 250 GR,DTE 250 HTEN,DTE 562 MTE~,CSG 250 IDPH,DTE 250 ILD,DTE 250 'IDQF,DTE 250 IIRM,DTE 250 GR,DTE 250 HTEN,DTE 554 MTE~.CSG ~g IDPH,DTE ILD,DTE 250 IDGF,DTE 250 IIRM,OTE 250 GR,~TE 250 HTEN,DTE 577 MTE~i. CSG -999.250 -999 250 -999 250 -999 250 -999 250 -999 250 ~17 563 ~999.250 999.250 -999.250 -999~2~0 :999.25o 999.250 116~813 -999 250 -999 250 -999 250 -999 250 -999 250 -999,250 ti6,500 -999.250 99,250 '999.250 '999 250 '999~250 ~15,563 CIMP.DTE ClLMDTE I~QF:DTE IIXM.DTE TENS.DTE GR,CSG HTEN,CSG CI~P.DTE ClLM DT.E I~OF!DTE II×~ DTE TENS.DTE GR.CSG HTEN,CSG CIMP,DTE ClLM,DTE IMQF,DTE IIXM.DTE TENS,DTE GR.CSG HTEN.CSG CI~P.DTE CILM.DTE IMQF.DTE IIX~.DTE TENS.DTE GR.CSG HTEM.CSG '999,250 '999,250 '999,250 '999.250 '999.250 65,313 664.500 -999 250 -999 ~50 -999 250 -999 -999 688 500 :999,250 999,250 -999.250 :999.250 999,250 67,250 677,000 -999 250 -999 250 -999 250 -99~ 250 -99 250 75 625 699 000 -999,250 '999,250 -.999~250 ~999,250 -999,250 62,719 689.500 -999,250 -999,250 -999~250 -999,'250 -999'250 74,688 682,500 -999 250 -999 2~0 -999 ~999 250 -999 250 59 469 676 500 ~IS Tar. e Verification Listi~O 2-!~A¥-199! 22:58 PAGE: 12 .chlumber~.uer Alaska Computin~ Center DEPT 8.200.000 CI DP. ~q, TE -999 250 IPPM.DTE 999.250 CI~P.DTE -999,250 I~PM~OTE 99q.250 CILD.DTE -999~250 ILD, [)TE -'999.250 CILM.DTE -999,250 IL~.D. TE -999.25o IFRE.~TM -999 250 IDOF.DTE -999.250 IMQF,DTE -999, ~50 IIRD OTE -999.250 IIXD.DTE -999:250 IIRM,DTE -999.250 IIXM.DTE -999, 50 SFL!!~TE -999 250 S~.DTE -999:250 GR.DTE -999.250 TEMS.DTE -999,250 NTE~. DTE -999:25{3 ~R ES. DTE -999 250 HTEN. DTE -999.250 GR,CSG 61.9~8 TEiqS.CSG 369o.000 ~ES.CSG ~.57! MTE~=i, CSG 114.375 HTEN.CSG 708,500 DEPT. 8100.000 CIDP.DTE IMPH.DTE -999.250 CILD.DTE IL~.DTE -999.250 IF~.DTE IIRD.DTE -999,250 IIXD.DTE SFL~).DTE 999,250 SP DTE ~TE~ DTE 1999.250 ~RE$:DTE 5 5.00o RE$.CSG DEPT. 8000.000 CIDP. T~ I~P,.DTE -999,250 CILD.DTE IL~.DTE -999,250 IFRE.DTE IIRD.DTE -999.250 IIXO.DTE SFLU.OTE 999,250 SP.OTE ~TE~.DTE ~999,250 ~RES,DTE TENS.CSG 3520.000 ~RES,CSG DEPT. !900,000 CIDP.DTE IMPH.DTE 999,250 CII. D.DTE IL~.DTE 999,250 !FRE.DTE IIRD.DTE -999,250 IIXD.OTE SFL~'~..DTE -999.250. S~.DTE. MTE~.DTM -999.250 MRES.DTE TENS.CSG 3480.000 ~RES.CSG ~EpT. !800,G00 CIDP DTE ~P~.DTE '999~250 CILD:DTE IL~.DTE ,999 250 IFRE.DTE IIRD DTE ~999~250 IIXD,DTE SFL~DTE 999.250 SP.DTE ~TE~.DTE -999.250 ~RES,DTE TENS.CSG 3475,000 ~RES.CSG DEPT, ~r 7700.000 CIOP.D%E I~PU.D.E -999.250 CIbD.DTE IL~.DTE -999.250 IFRE.DTE IIRD.DT~ -999.250 IIXD,DTE SFbLi ~T~ -999,250 SP.DTE .DTE -999.250 MRE$,OTE TENS.CSG 3430.000 ~RES,CSG DEPT. 7600.000 CIDP.I)TE I.~PH. DTE -999 250 CILD, ipT~] IL~';. DTM 999' IIR~.DTE :999,250 IFRE.DTE .250 IIXD.DTE SFLU. DTE -999. 250 SP. DTE ~TE~. OTE -999.25<)~ ~!RES.DTE -999 250 -999 250 -999 250 -999 250 -999 250 -999 250 1,551 -999 250 -999 ~50 -999 250 -999 250 -999 250 -999 250 1.610 -999 250 -999 250 -999 250 -999 250 -999 250 -999 250 i,6~6 -999.250 -999 250 -999 250 :999 250 999 ~0 -999 0 1.61~ -999 25O -999[250 -999.250 -999.250 -999,250 -999,250 1.6~7 '999,~50 '999.250 '999,250 '999.250 '999.250 '999.250 IDPH,DTE 999.250 CIMP.DTE -999,250 ILD,DTE ~999.250 ClbM.DTE -999,250 IDQF,DTE -999.250 IMQF.DTE -999,~0 IIRM,DTE -999.250 IIXM.DTE -999,~50 GR.DTE -999.250 TENS.DTE "999,2~0 ~TE~,DTE -999.250 GR'CSG 85,313 ~TEM,CSG 114.125 HTEN.CSG 722,500 IDPH.DTE IhD,DTE IDOF,DTE IIRM.DTE GR,DTE HTEN.DTE ~TE~,CSG IDPH IDQF IIRM HTEN IDPH IDOF IIRM GR HTEN ~TEM IDPH ILD IDQF IIR~ GR HTEN ~'TEM IDPM ILD !DOF IIR~ GR HTE~ , OTE ,DTE ,DTE . DTE ,DTE ,DTE ,CSG ,DTE ,DTE ~DTE ,DTE ~DTE ,DTE .CSG ,DTE ,DTE ~DTE ,DTE ,DTE ,DTE ,CSG ,DTE ,DTE ,DTE TTM ,DTE .DTE -999.250 -999 290 -999 250 -999 250 -999 250 -999 250 113.188 -999 250 -999 250 -999 250 -999 250 -999 250 -999 250 112.500 -999 250 -999 250 -999 250 -999 ~50 -999 ~50 -999 250 111 938 ~999.250 999.250 2999'250 .999.250 999,250 -999.250 110.375 -999.250 -999.250 -999.250 -999,250 -999,250 -999.250 ClMP,DTE ClLM.DTE I~QF.DTE IIXM,DTE TENS.DTE GR'CSG HTEH,CSG CIMP,DTE ClLM.DTE I~OF.DTE IIX~,DTE TENS.DTE GR.CSG HTEN.CSG ClMP.DTE CILM,DTE IMOF.DTE IIXM,DTE TENS,DTE GR.CSG MTEN.CSG CI~P,DTE ClL~.DTE I~QF.DTE IIX~,DTE TEMS.DTE GR,CSG HTE~,CSG CI~P.DTE CIL~.DTE IMOF,DTE IIX~.DTE TENS DTE GR:CSG -999 250 -999 250 -999 250 -999 250 -999 250 69 125 721 500 -999,250 -999,250 -999,250 -999,250 -999.250 63.281 716,000 '999.250 '999~250 '999'290 999'250 60,250 722,000 '999,250 -999'25§ -999, -999,290 76,563 728,000 '999.250 '999~250 '999,' 0 '999,250 5].844 :IS Tape verlflcatiom Listivq chlumberoer Alaska Computinq Center 2-~,~AY-199! 22:58 PAGE: TE~S.CSG 3460.0(.)0 i~RES. CSG 1.664 ~TE.~. CSG D~PT 7500 000 CIDP.DTE -999.250 IDPM,DTE IMPM~DT~i -999~250 CILD.DTE -99~ 250 ILD.DTE IL~.DTE -999.250 IFRE.DTE -99:250 IOOF,OTC IIaD.DTE -999.250 IIXD.DTE -999.250 IIR~,DTE SFLU.DTE -999.250 SP.DT£ -999.250 GR,DTE ~TE~ DiE -999.250 MRE$.DTE -999.250 HTEN,DTE TENS:CSG 3400.000 ~RE$.CSG 1.675 MTE~,CSG DEPT, IMP~.OTE Ib~,OTE IIRD.DTE SFL[).DTE MTE~' DTE .... 7400,000 -999 250 -999 250 -999 250 -999 250 -999 250 3410 OOO DEpT. 7300,000 I~PH.DTE -999.250 IL~.DTE ~ '9'99,250 IIR~,DTE -999.250 SFLU.OTE -999,250 ~TE~.DTE -999,250 TEMS,CSG 3375.000 DEPT. 1200,000 I~PH.DTE 999.250 Ib~.DTE -999.250 IIRD.DTE -999,250 SFLU,DTE -999,250 MTE~,DTE '999.250 TENS,CSG 3395,000 DEPT. 7100,000 I~P~{ DTE -999 250 IL~' ' .DTE 999,250 IIRD.DTE :999,250 SFLU.DTE '999,250 MTE~ DTE '999,250 TENS:CSG 3305,0~0 DEPT. 7000,000 IMP~.DTE -999,250 IL~,DTE -999,250 IIRD.DTE -999,250 SFI. I;'DTE -999.250 NTE~.DTE -999,250 TENS.CSG 3375,000 DEPT. 6900,000 I~PN.DTE -999.250 IL~.DTE -999.250 IIRD.DT~ -999,250 SFbI.~.DT~ -999.250 ClDP.DTE -999.250 IDPH,DTE CIbD.DTE '999.250 ILD.DTE IFRE.DTE -999.250 IDOF,DTE IIXO.DTE -999,250 IIRM,DTE SP.DTE '999.250 GR,DTE ~RES,DTE -999.250 HTE~ DTE ~RES.CSG 1,691 MTEM:CSG CIDP.DTE -999.250 IDPH,OTE C!LD.DTE -999.250 ILO.DTE IFRE.DTE -999.250 IDOF,DTE I!XO.OTE '999.250 IIR~,DTE SP.DTE '999.250 GR~DTE ~RES,DTE '999,250 MTE~,DTE ~RES.CSG 1.727 ~TE~.CSG CIDP.DTE '999,250 IDPH,DTE ClLD,DTE '999.250 ILD,DTE IFRE.DTC -999,250 IDOF,DTE II×D.DTE 999,250 IIR~,DTE SP.DTE :999,250 GR,DTE ~REIiDTE '999.250 "TE~.OTE ERE CSG 1,705 MTE~,CSG CIDP,DTE 999,~50 IDPH,DTE CILD,DTE %999. 50 ILD,DTE IFRE.DTE -999.~50 IDOF,DTE IIXD.DTE -999.250 IIR~.,DTE SP,DT~ '999,250 GP,DTE ~RES,DTE -999.250 HTE~,.DTE aRES.CSG 1,75~ MTEM,CSG CIDP.DTE -999.250 IDP~,DTE CILD.DTE -999 250 ILD,DTE IFRE.DTE -999:250 ID~F,DTE [IXD,DTE '999,250 IIR~,DTE SP,!)TE '999,250 GR,DTE ~RES.DTE -999.250 HTE~.DTE ~RES.CSG 1.787 MTE~,CSG ClOP.OWE '999.250 !DP~{,DTE CIDi).DTE '999.250 ILD.DTE IFRE.OTE -999'250 tDQF,DTE IIXD.DTE -999.250 IIR~.DTE SP,DTF '999,250 ~,DTE 109.938 -999.250 -999 250 -999 250 -999 250 -999 250 -999 250 109 188 999.250 2999.250 -999.250 -999.250 -999.250 -999 250 -999.250 -999 250 -999.250 -999.250 -999,250 ~07.438 -999.250 '999, '999,250 '999.250 '999.,250 107.125 -999 250 -999:250 -999,250 -999.250 99.250 105.688 '999.250 -999,250 :999,250 999'250 -999.250 -999 250 I04~938 -999.250 -999.~50 -999.250 -999.250 -999.250 HTEN.CSG 759,500 ClMP.DTE -999.250 CILM DTE -999.250 IMOF~DTE -999.250 IIXM.DTE -999,250 TE~S.DTE -999.250 G~.CSG 6],094 HTEN.CSG 728,000 ClMP,DTE CIL~.DTE I~QF,DTE IIXM.DTE TENS DTE GR~CSG HTEN'CSG CINP.DTE CILM DTE IMQF.DTE IIXM.DTE TENS,DTE GR,CSG HTEN.CSG CIMP.DTE CILM,DTE IMQF,DTE iIXM.DTE TEN$.DTE GR.CSG HTEN.CSG C!MP,DTE CILM.DTE I~OF.DTE IIXM.DTE TENS.DT£ GR.CSG HTEN,CSG CIMP.DTE CIbM.DTE IMOF,DTE IIX~ DTE TE .tS,DTE GR,CSG HTEN.CSG CIMP,DTE CIhM.DTE !MOF.DTE IIXM.DTE TENS.DTE -999 ~50 -999 50 -999 250 -999 250 -999 250 88 31t 726 500 -999 250 -999 250 -999 250 -999 250 -999 250 56 688 740 500 -999,250 '999,250 -999'250 -999., 50 -999;~50 7~, 88 '999,250 '999,250 '999~250 '999,250 '999,250 70,938 725,500 ~999.250 %999; 50 9991~50 -999;250 -999.250 -999 250 '999 250 '999 250 '999 250 '999 250 .IS Tane verification bistinq 2-~.A'Y-199] 22:52 PAGE: 14 ~¢blumberQer Alaska Computlnq Center ~TE~ 07~ -~99.250 ~iRES.DT~7 250 HTE'N.OTE -999 250 GR CSG 61 668 TENS'.CSG 3310. 000 -~'~-'~RES. CSG 710 ~{Tff..~,CSG ~04.500' MTEM,CSG' 772:500 DMPT 6800.000 CIOP DT£ 250 IDPH UTE -999.250 CI~P.DTE I~PH:OTE -999 250 CILD:DTE 250 I~O:DTE -999,250 CILM.DTE IL~ DTE -999:250 IFRE.DTE 250 IDQF DTE -999.250 IMQF DTE tINPlaTE -999.25,3 !iXD.DTE 250 IIRM:DTE -999.250 IIXM:DTE SFL~!.DTE -999.250 SP.DTE 250 GR,OTE -999,250 TENS.DTE ~TE~.OTE -999.25(i) ~RES.DTE 250 HTEN.DTE -999.250 GR.CSG TFMS.CSG 3290.000 ~RE$.CSG 711 ~TEM,CSG 104,~88 MTEN.CSG DEPT. 6700.000 CIDP.DTE IMPN.DTE -999.250 CILD.DTE I5~.DTE -999.250 IFRE.DTE IIRD DTE -999,250 IIXD,DTE SFLU~OTE -999.250 SP.DTE MTE~.OTE -999,250 ~RES.OTE T~MS.CSG 3195.000 MRES.CSG DEPt'. 6600.000 CIDP.DTE I~P~ DTE -999.250 CILD.DTE IL~DT~ -999,250 IFRE,DTE IIRD.DTE -999.250 IIXD.DTE SFLU,DTE -999.250 SP,DTE ~TE~ DTE -999,250 ~RES.DTE TEM$:CSG 3125,000 NRE$.CSG DEPT. 6500 I~PE.QTE -999 IL~.DTE -999 IIRD.DTE -999 SFLU.DTE -999 NTE~.OTE -999 TEMS.CSG ~120 DEPT. !400 IMPM~DTE 999 IL~:QTE 999 II~D,DTE -999 SFLU.[)TE -999 MTE~ 0TE 999 DEPT. 6300 IMPM,DTE -999 IL~.DTE -999 I!RD.DTE -999 SFLU.DT~q -999 MTE~.DTE -999 T~NS,CSG 3045 DEpT 6200 IMP~ $DTEi -999 Ib~, DTE -999 I IRD. DTM -999 000 CIDP.OTE 250 ClLD.DTE 250 IFRE.DTE 250 IIXD.OTE 250 SP,DTE ,250 ~RES,DTE ,000 ~RES.CSG ,OOU CIDP.DTE ,250 CILD.DTE .250 !FRE,OTE ,250 IIXD,DTE · 250 SP.DTE ,25() ~RES,OTE ,000 MRES,CSG ,000 CIDP DTE ,250 I~RE,DTE .250 IIXD.DTE .250 SP,DTE ,250 MRES.DTE .000 ~RES,CSG 000 CIDP.DTE .'250 CILO,DTE .250 IFR£,DTE .25o IIXD.DT5 -99~, i. -999, -999. -999 '9991 -999 '999 -999 -999 '999 '999 '999 '999, -999 '999i '999' '999. '999. '999. 1. 99~, -'999, '999, '999 '999 '999 '999 '999 '999 t. '999 '999. '999. '999, '999. '999. '999, '~99. '999. '999. 250 250 250 250 250 25O 763 250 25O 250 250 250 250 773 250 250 250 0 250 250 0 250 250 800 250 250 250 250 250 250 858 250 250 250 250 IDPH,DTE ILD DTE IDQF DTE IIRM DTE GR DTE HTEN,OTE ~TEM,CSG IDPM,OTE ILD,DTE IDaF,DTE IIRM,DTE GR,OTE MTEN,OTE MTEM,CSG IDPH. DTE ILD,DTE IDQF, OTE IIRM,DTE GR,DTE ~EN ,.OTC MTEM,CSG IDPH,DTE ILD,DTE IDOF.DTE IIR~,DTE GR.DTE HTEN.DTE MTEM.CSG IDPH.DTE DT ILD. E IDQF,DTE IIRM,DTE GR,DTE HTEM,DTE ~TE~,CSG IDPH,DTE ILD,DTE IDOF,DTE IIR~,OTE -999.250 CIMP DTE -999.250 CILM:DTE -999.250 IMOF.DTE -999.250 IIXM.DTE -999.250 TENS.DTE -999,250 GR.CSG 103,250 HTEN.CSG -999.250 CIMP.DTE -999,250 CIbM.DTE -999.250 IMOF.DTE -999.250 IIX~.DTE :~99i250 TENS,DTE -9~9,250 -9 9.250 -999 250 -ggg 250 -999 250 -999 250 102 188 -999,250 -999~250 -999'~ 999, 50 '999,~50 ~0~.375 -999 '~50 -999~ 50 -999.250 -999.250 -999,250 -999,250 100.063 -999 250 -999i250 -999 250 -999,250 CIMP DTE CI4~:DTE I~OF DTE IIX~ DTE TENS DTE G~ CSG HTEN CSG CIMP.DTE CILM.DTE I~QF DTE II×~:DTE TE~$.DTE GR,CSG ~TEN.CSG CIMP,DTE CILM,DTE IMOF.DTE IIXM,DTE TENS DTE GR~CSG STEN,CSG CIMP.DTE CILM.DTE IMOF.DTE IIXM.DTE -999 250 '999 250 -999 250 '999 250 '999 250 53'313 762,000 '999 250 '999 250 -999 -999 250 55 938 755 000 '999,250 -999,250 -999,250 ~999,250 999,250 75,063 748'500 -999,250 :999~250 999,250 '999e250 '999,250 63,688 754.000 -999~25 -999,25~ '999~250 ~999,250 ~999.,250 70'563 772,000 '999,250 '999'250 '999,250 '999,250 '999'250 73,125 761'000 '999,250 '999~250 '999'250 "999,250 =IS Ta~e VerifY. cation Listin<~ ~-~AY-].99.1. 22:58 PAGE: 15 cblu~terqer Alaska Com.~utiDq Center '" SF[~tMTE~..DTE· ~.~%'C -9Q9,250. SP.I.~5.) ~"' -999.25() GR,D~E -999.250 TENS.DTE '999,~50 '999.250 ~RES. DTE -999.250 RTE,!, D E -999.250 GR.CSG 84,~88 TE~S.CSG 3045,00~) ~RE$.CSG 1.797 MTE~,CSG ~00.063 HT~N.CSG 777,000 DEPT. 6100.000 CIDP.DTE -999 250 IDPH,DTE -999 250 CIMP.DTE -999,250 I~P!~.DTE -999,250 CILD.DTE '999i250 ILD.DTE -999!250 CILM.DTE -999,250 IL~.DTE -999.~50 IFRE,DTE -999 250 IDQF,DTE -999 250 IMQF.DTE -999,250 IIR~,DTE -999.25~ IIXD,OT~ '999,250 IIR~,DTE -999 250 IIX~,DTE · -999'250 SFLU,DTE -999,259 SP.DTE -999.250 GR,DTE -999,250 TEN$.DTE -999,250 ~TE~.DTE -999,250 4RES.DTE -999.250 NTE~,DTE -999,250 GR,CSG 83,063 TEN$,CSG 2975, ~ . . · 00~) ~ES.CSG 1 81R MTE~;,CSG 99.313 HTEN,CSG 784,000 DEPT. 6000,000 CIDP.OTE ~999 250 IDPH,DTE -999 I~P~,DTE -999,250 CILD.DTE 999~50 ILD,DTE -999 IL~,DTE -999,250 IFRE.DTE -999.250 !D~F,DTE -999 IIRD DTE -999,250 IIXD.DTE ~999,250 IIRM,DTE -999 SFbI~:DTE -999,250 SP,DTE 999.250 GR,DTE -999 MTE~.DTE -999,250 MRES,DTE -999,250 MTEN,DTE -999 TENS.CSG 2925,000 ~RES,CSG 1,872 ~TE~,CSG 97 D~PT, ~900,000 ~IDP DTE -999.250 IDP~,DTE 999, I~PH'DTE 999.250 .ILD:OTE -999 250 ILD,DTE 1999. IL~,DTE -999,250 !FRE,DTE -999~250 IDQF,DTE -999 IIRD DTE -999.250 IIXD,DTE -999~250 IIR~,DTE -999 SFLU'DTE. T ' ' -999,250 SP.DTE -999 250 GR,DTE 999 M.E~ DTE -999,250 MRE$,DTE -999,~50 HTE~DTE -999 T~NS:CSG 2875.000 ~RE$,CSG 1,879 MTE~,CSG 97 250 CIMP,OTE -999.250 250 CILM.DTE -999'250 250 IMQF.DTE -999~250 250 IIX~,DTE -999,250 250 TENS,DTE -999~250 250 GR.CSG 938 HTEN.CSG 781,000 250 CIMP.DTE ~50 CILM,DTE 250 IM~F.DTE 250 IIXM DTE :250 TENSiDTE 250 GR CSG 250 HTEN,CSG DEPT 5800 00o CIDP,DTE -999 ~50 IDP~i,OTE -999.250 I~P~:DT.~ E -999,250' ' CILD,DTE -999i 50 ILD,DTE -999 250 ILM,DTE -999.250 IFRE,DTE -999 250 IDQF, DTE -999~250 IIRD,DTE -999,250 IIXD,DTE' -999,250 IIR~,DTE -999- 250 SFLU, DTE -999,250 SP,OTE -999,~50 GR, DT'E -999 250 ~TE~i, DTE -999.25(> ~R~S, ~)TE -999.250 NTE~,DTE -999:250 TEN$.CSG 2855,000 ~RES,CSG 1.910 MTEN,CSG 96.750 250 IDPN,DTE 999.250 250 ILD,DTE ~999,250 250 IDQF,DTE -999,250 250 IIRM,DTE -999,250 250 G~,DTE -999,250 250 HTE~.~,DTE -999,250 914 MTE~,CSG 95,938 250 IDPH,DTE 999, 250 ILD,DTE ~999. 250 IDOF,OTE -999 250 iIRM,DTE -999 250 GR,DTE -999 250 HTf]~i,DTE -999 884 ~TE,~,CSG 95 DEPT. 5700.000 ClDP.DTE -999 I~P~.DTE -999,250 CILD,DT~: -999 IL~.DTE -999,250 IFRE,DTE -999 IIRD,DTE -999.250 IIXD,DTE -999 SFLU,DTE -999,250 SP,DTE -99'9 MTE~.DTE -999,250 ~RES~DTE -999. TENS,CSG 2795,000 ~RE$.CSG DEPT. 5600,000 CIDP,DTE -999. IMPW DTE -999,250 CIbD,DTE -999. ~L~'DTE. -999,25o. TFR~,DTE.~ -999, IIRD,DTE -999,250 IIXD.DTE -999. SFLU. DTE -999,250 SPeDT~ '999. ~'TE~, DTE '999,250 ~RES.. DTE '999. TEMS,C5(; 2745,000 ~ES.CSG ~ . 250 250 250 250 250 250 813 ClMP.DTE CIL~.DTE IMQF.DTE IIXM DTE TENS:DTE GR.CSG HTEN,CSG ClMP,DTE ClLM.DTE IMQF,DTE TENS TE MTEM,CSG CIMP.DTE CILM.DTE IMQF,DTE IIXM.DTE TEMS,DTE GR,CS~ MTEN,CSG -999 250 -999 250 -999 250 -999 250 -999 250 §00 -999~250 '999,250 5O -999e250 999,~75 38'~0o 783, 99,250 -999'250 -999,250 -999'250 43,844 786,500 2999,250 999~250 -999,250 -999'250 '999i.250 35,2~9 790,000 IS 'rape Vert~icatton [;isting chlu~berqer AlasKa Computir, q Cer~ter 2-~AY-1991 22:58 PAGE: 16 DEP~'. 5500.000 CIDP.[)fg '999. INPN.D'rE -999.250 CILD.DTE -999. IL~.DTE -999.250 IFRE.DTE -999. !IRD.DTE -999.250 IIXD.[}TE -999 SFLU.DTE -999.250 SP.DT~ -999: MTE~.DTE -999.250 NRES.DTE '999. TE~!$.CSG 2730.000 ~RES.CSG I. DEP?. 5400.000 CIDP.DTg '999. I~P~.D~E -999.250 CILD.DTE '999. IL~.DTE -999.250 !FRE.DTE -999. IIRD.D?E 999,250 IIXD.DTE -999 SFLU.DTE ~999.250 SP.DTE '999~ ~TE~.DTE -999.~50 ~RES.DTE -999. TF~$.CSG 2710.000 ~RES,CSG 1. DEpT. 5300.000 CIDP.DTE -999 IMP~.DTE -999.250 CILD.DTE -999 IL~.DTE -999,250 IFRE,DTE -999 IIRD.DTE 999.250 IIXD,DTE -999 SFLU.DTE ~999,250 SP.DTE -999 MTE~,DTE -999.250 ~RES,DTE -999 TEN$.CSG 2670,000 ~RES.CSG 1 DEPT. ~200,000 CIDP.DT£ IMP~.DTE 999,250 CILD,DTE ILM,OTM -999.250 IFRE,DTE IIRD.DTE -999,250 IIXD,DTE SFLU.DTE -999,250 SP.DTE MTE~ DTE -999,250 ~RES.DTE TENS:CSG 2620,000 ~RES.CSG '999 -999 -999 '999 -999 -999 DEPT 5100,000 CIDP,DT~ '999, I~PH'DTg -999.250 CILD.DTE -999. IL~:DTE -999 250 IFRE.DTE '999. IIRD.DTE -999 250 IIXD,DTE '999. SFL{.].D'rE -999 250 SP.DTE '999. ~TE~ DTE -999 250 MRES.DTE -999, T~NS:CSG 2620.000 ~RES.CSG DEPT. 5000,000 CIDP.DTE -999. IMPN.DTg -999,250 CILD.DTE -999. IL~.DTE -999,250 IFRE.DTg -999. IIRD DTE -999,250 IIXD.DTE -99 SFLU'DTE -999.~50 SP DTE -99 ~TE~. IF -999,250 ~RES DTE -999~ ~' ~SG 2. TENS.CSG 2590.000 DEPT. 4900.000 CIDP.OTg IMPN.DTE -99q.250 CILD.DTE .IL~.DT~ -999,250 IFRE.DTE IIRD.DTE -999.250 IIXD.DTE: SFLU.DTE -999,250 SP'~%T? MTE~,DTE -999.25~) ~RE5. ..... ~. · m~? CSG 2560.000 ~RE$.CSG -999. -999. -999 -999. -999, -999. 250 IDPH.DTg 250 ILD.DTE 250 IDOF.DTE 250 IIRM,DTE 250 GR,DTE 250 HTEN,DTE 908 NTEA.CSG 250 IDPH,DTE 250 ILD,DTg 250 IDQF,DTE 250 IIRM,DTE 250 GR,DTE 250 HTEN~DTE 921 NTEM.CSG 250 IDPH,DTE ~50 ILD.DTE 250 IDQF~OTE 250 IIRM,DTE 250 GROTE 250 ~TEN:DTE 965 MTEM,CSG 250 IOPH.OTE 250 ISD,DTE 250 IDG'F,DTE 250 IIRM.DTE 250 GR~DTE 250 HTEN.DTE 961 ~TE.M,CSG 50 IDPM,DTE 50 ILD,DTE 250 ID'QF.DTE 250 IIRM DTE 250 GR DTE 250 HTEN DTE 990 MTE~,CSG 250 IDPH,DTB 250 ILD,DTE 250 IDQF,DTE 250 ItRM.OTg 250 GR,DTE 250 HTEN,DTE 008 MTEM.CSG 250 IDPH.DT'E 250 ILD.,DTE 250 IDQF,.DTE 250 IIR~,DTE 250 GR,OTE 250 HTEM,DTE 008 ~TE~,CSG -999.250 -999 250 -9g 1 5o -999.250 -999.25O -999.250 95.625 -999.250 -999.250 -999.250 -999 250 -999'250 95.313 999i250 999 250 999 250 -999:~50 -999 50 94 63 -999.'250 -999.250 -999.250 -999.250 -999,250 -999.250 93,3X3 '999,250 '999,250 -999.250 -999,250 '999,250 '999,250 92,688 -999 950 -999:50 -999 ~50 -999i 50 -999 50 -999,250 9~,625 -999.250 -999,250 -999.250 ~999!.250 999 250 999 250 91.125 CIMP.DTE ClLM.DTE I~QF,DTE IIX~.DTE TE~S DTE GRiCSG HTEN CSG CI~P.DTE CILM,DTE IM~F,DTE IIX~.DTE TENS.DTE GR.CSG HTEN.CSG ClMP.DTE CILM.DTE IMQF.DTE IIXM.DTE TENS DTE GR:CSG HTEN.CSG CIMP.DTE CILM,DTE IMQF.DTE IIXM.DTE TENS,DTE GR,CSG HTEN,CSG CIMP,DTE ClbM.DTE IMQF,DTE IIXM.DTE TEN$.DTE GR.CSG HTEN.CSG CIMP.DTE CILM.DTE IMQF,DTE IIX~.DTE TENS.DTE GR.CSG HTEN.,CSG CIMP.DTE IMQ DTE IIXM.DTE TENS.DTE GR.CSG ~{TEN,CSG -999.250 -999,250 -999,250 -999,250 -999,250 54,438 815,000 -999,250 -999,250 -999,250 -999'250 '999,250 38,656 821'500 -999,250 -999,250 -999.250 -999,250 -999,250 34,406 798,500 :999.250 999. -999,~ 0 '999,250 '999,250 0oo -999 250 50 -999 {50 -999 -999 250 844 823 500 '999,250 999~50 -999,250 -999,250 31,~97 806, O0 -999 ~0 -999 50 ~999 250 -999 250 -999 ~50 43 38 826 500 .IS Ta~'.e VerJ~i. cation L~st:inq 2-~AY-1991 22:58 PAGE: 17 ;CblUmherger AlasKa Comc.~]tinq CeDter · - DF-.p'r. 4800.0o0 CI D~. [~'r~] -999.250 IDPH.DTE -999.250 CIMP.DTE -999,250 I~p~IS:~.. t.)TE ..... -990,25~') CILD. DT~; -999.250 ILD,.OTE -999. 250 CILN. DTE -999,250 ~-~. DTE -999.25~) IFRE.OTE -999.250 IDQF,OTE -999.250 I~QF.DTE -999.250 IIR~..QTE -999.250 I!XD.DTE -999,250 IIRN.DTE -999.250 IIXN.DTE -999,250 SF~. ~D'rE 999,250 SP.~TE -999,250 GR.DTE -999,250 TE~S.DTE -999,2~0 ~TFTM- . DTE.2999,250. :.~.~- R ~;$. F~T E -999.250 HTE~, DT£ -999,250 GR.CSG 28,625 TE~S.CSG 2625.000 ~R ~.S. CSG ~.000 ~TE~, CSG 90.563 HTEN.CSG 865,000 DEPT. 4700.000 CIDP.DTE -999 250 IDPH,DTE -999.250 CI~P.OTE 999m250 I~P~,DTE -999,250 CILO'DTE -999[250 ILD.DTE -999,250 CILM.DTE ~999,250 ~L~.DTE -999,250 !FRE.~TE -999.~50 IDOF,DTE -999.250 i~QF,DTE -999,250 IIRD.~TE 999,250 IIXD.DTE -999.250 IIR~,DTE -999.250 II×M.DTE -999,250 SFL{,.DTE 2999,250 SP.OTE -999.250 GR,DTE -999 250 TENS.DTE -999 250 NTE~.DTE -999,256 ~RE$,DTE -999.250 HTE~.DTE -999~250 GR,CSG ~9:969 TEN$.CSG 2560,000 ~RES.CSG 2.053 NTE~,CSG 89.56] HTEN.CSG 855,000 DEPT, 4600.000 CIDP.DTE -999 250 IDPM,DTE 999.250 CINP,DTE I~P~.DTE -999,250 CILD,DT~ -999:250 ILD,DTE ~999.~50 CIL~,DTE IL~.DTE -999,250 IFRE.DTE -999,250 IDQF.DTE -999.250 IMOF.DTE SFL[),DTEIIRD DTM ~999,250 IIXI~,[~E ~999,250 IIR~,OTE 999 250 IIX~.DTE 999,250 SP,DTC 999.250 G~,DTE 2999:~50 TEf~S DTE MTE~.DTE -999.~50 MRES,DTE '999,250 HTE:~.DTE -999,250 GR:CSG TENS,CSG 2535,000 NRES.CSG 2.06~ MTE~i,CSG 88.938 HTEN.CSG D~PI'. 4500.000 CIDP,OTC -999,250 IDPH,DTE -999 250 CINP.DTE I~P~ DTE -999,250 CILD.DTE -999,250 ILO.OTE -999~250 CIL~,DTE IIRD.OTEIL~:DTE ~999'250' IFRE,DTE -999,250 IDQF'DTE -999 250 I~OF,DTE 999.250 IIXD.DTE -999.250 IIRi~,DTE -999:250 IIXM.DTE SFLU.~TEMTE~,DTE ~999'25~;"' SP,DTE -999,250 GR,DTE -999 250 TENS DTE 999,250 ~RES,DTE -999,250 HTE~,DTE -999:250 GR:CSG TEaS,CSG 2390,000 aRES,CSG 2.070 MTE~,CSG 88.250 HTEN.CSG DEPT, 4400,000 CIDP.DTE -999 250 IDPH,DTE -999,250 CI~P,DTE IMP~'!,DTE -999,250 CILD DTE -999~250 ILD,DTE -999,250 IL~ DTE -999.250 IFRE~DTE -999-250 IDQF,DTE -999,~50 CILM.DTEIMQF.DTE IIRD'D"'~ -999 250 IIXD DTE '999.250 IlR~, ~ · .~ · DTE -999 ~50 IIXM, ,.~ . · ~ . DTE SFLUMTE~,D~.. -999 250 SP.DTE '999, 50 GR,DTE -999,250 TENS DTE ,D~E -999,~50 ~RE$,~TE '999. 50 HTEN,DTE -999,~50 GR:CSG T~NS,CSG 2395,000 ~ES,CSG 2,070 MTE~i,CSG 87.750 HTE~'CSG DEPT. 4300.000 C!DP,DTE ~999.250 IDP~,DTE -999,250 CI~P,DTE IMP~,DTE -999,250 CIL~,DTE 999,~50 ILD,DTE -999,250 CIL~,DTE tL~ DTC -999,250 tFRE.DTE '999.250 IDQF,DTE -999,250 I~QF,DTE IIRD~DTM -999,250 IIXD,DTE '999,250 IIRM,.DTE -999.250 IIXM.DTE SFLU.D't'~ -999,250 SP.DTE -999,250 GR,DTE -999.250 TENS.DTE ~TE~.DTE -999,250 ~E$.DTE '999,250 HTE~3,OTE -999'250 GR.CSG T~S,CSG ~350.000 ~PES.CS~ 2.~15 MTE~.,CSG 87.063 ~TEM.CSG D .PT. 4200 000 CIDP.DTE '999.250 IDPH,!.)TE -999.250 CI?~P.DTE I~P~iL~~.DTE -999'250~. ~ CIL~.DTE ~999,250 ILD,DTE~ 999 .250 CILM.DTE II~,DTE -990 25~: IFRE.DTE .999.250 IDQF,DTE ~999'250 I~QF.DTE ~.DTE -999. .250 IIX[).DTE 999.250 IIR~,DTE -999'250. IIX~'~.DTE SFL[~. D'~ ~ -999.250 SP.DTE ~999,250 GR, [~TE -999.250 'rE.~ S. DTE ~TE~.. O. E -999.250 ~RES. C. TE 999.250 HTE?~.~. DTS -999,250 GR.CSG -999 250 -999 250 -999 250 -999 2.~0 -999 2 0 49 ~3 854 000 '999,250 '999,250 '999,250 '999,250 '999,250 26'~56 820,000 '999,250 "999,250 '999'250 '999'!50 '999, 50 41, 38 838,500 '999 250 -999 250 '999 250 '999 2:50 '999 250 47 688 829 000 -999 ~50 -999 2S0 -999 250 -999 ~50 -999 ~50 ~6 844 ver1fication blstina 2-1.'.AY-.1991 22:58 PAGEI 18 ;chlun. berqer AlasKa Comt~u. tinq Center '' 2]45.000 r-:R~:$. CS(; 2.J48 ~-~TE?.. CSG 86.250 HTEN.CSG 859,500 EPT. 4100.OOU C!DP.DTE -999.2.%0 IDPH,DTE -999.250 CI~.P.DTE ID"P~. DTE -999.256 CILD.DTE -99.0. 250 ILD. DTE -999.250 CIL~.DTE ILU.DTE -999.250 I~',P,F] OTE -999;250 IDQF,DTE -999 250 IMOF DTE ilRP DTE -999.25~ ". ' " · . .~ IIXD.nTE -999.250 IIRM,DTE -999.250 IIXM.DTE SFLU.DTE -999.250 8P.DTE -999.250 GR,OTE -999.250 TENS.DTE ~;TE.~ .DTE -999.250 ~iS. DTE -999.250 HTEN, DTE -999. 250 GR.CSG T~S.CSG 2270.00n ~RES.CSG 2.195 MTE~,CSG 85.~25 ~TEN.CSG DEPT. 4000.000 CIDP.D~E -999.250 IDPH,DTE -999 250 CI~P.DTE I~P[q. OTE -999.250 CILD.DTE -999.250 ILD,DTE -999i250 CI[.~.DTE IL~.DTE -999,250 IFRE.D E -999,250 IDQF,DTE -999 250 IMQF.DTE IIRD DTE -999,250 IIXD.DTE -999.~50 IIRM,DTE -999.250 IIXM.DTE SFLU~DTE -999.250 SP.DTE -999.250 GR,DTE -999.250 TEN$.DTE MTE~.DTE -999,250 ~R~S.DTE -999 250 ~TEN,DTE -999.250 GR CSG TENS.CSG 2245.000 ~RES,CSG 2:2~9 ~TE~,CSG 84.125 HTEN:CSG DEPT. 3900,000 CIDP.DTC '999,250 IDPH,DTE -999. iMP~ DTE -999,250 CILD.DTE -999,250 ILD,DTE -999 ]L~DTE -999,25{3 IFRE.DTE -999.250 IDQF,DT~ -999 I~D.DTE 999,250 IIXD,DTE %999 250 IIRM,DTE -999 $FL~.~")"'m ~999.250 SP.DTE 999:250 GR,DTE -999 MTE~.DTE -999.250 ~RES.DT£ -999,250 ~TEN,DTE -999 TENS.CSG 2200,000 ~tRES,CSG 2.~40 MTE~,CSG 83 DEPT, 3800.(~00 CIDP.DTE I~PH.DTE -999,250 CILD,DTE IL~.D~E -999,250 IFRE.DTE II~D DTE -999.250 IIXD.DTE SFLU~DTE -999.250 SP.DTE ~TE'~.DTE -999"250 ~RES.D.TE T~NS.CSG 2090.000 ~RES'CSG DEPT, ) . !700,000 CIDP.DTE I~P~.ET~ 999.250 CILD.DTE Ib~.DTE 999.250 IFRE.DTE IIRD.DTE '999,250 !IXD.DTE SFLU DTE 999,250 SP.3 · DTE MTE~.DTE :999,250 MRES.[T~;~' TENS.CSG 2155.000 ~RE$.CSG DEPT, 3600,000 CIDP.DTE IMPH.DT~ -999.250 CILD,DTE IL~.DTE -999,250 IFRE.DTE I!RD.DTE -999.250 IIXD.DTE SFLU.DTE -999,250 SP,OTE MTE~ lIE -999.250 ~RES,DT~ TEi~$' .CSG 2170,000 DEPT. 3500.000 CIDP.DTE I~P}4,DTE -999.250 CILD.DT~; !L~.DTE -999.250 IFRE,DT~ IIRD.DTF -999.250 IIXD.DTE SFbU.DTE -999.250 SP.i)TC -999 ~50 -999 250 -999 250 -99 50 -999,250 2.244 -999 250 -999 250 -999 250 -999 250 -999 250 -999,250 2.238 !DPH,DTE -999, IGD,DTE -999. IDOF.DTE -999. IIRM,DTE -999, GR,DTE -999. HTEN,OTE -999. MTEM.CSG 82. IDPH,OTE -999 ILD,DTE -999 IDQF,DTE -999 IIRM,DTE -999 GR,DTE -999 HTEN.DT£ -999 MTEM'CSG 92 '999.~50 IDPH.DTE -999. -999.250 ILD,DTE -999. '999-250 IDQF,DTE -999. '999.250 IIRM,DTE -999. -999.250 GR,DTE -999. -999.250 HTEN,OTE -999. 2.264 ~TE~,CSG 80. i99~,250 IDPH,DTE ~999. 99 .250 ILI).DTE 999 99 .250 IDOF,.DTE 999.' '999.250 I I R~,.DTE 999 -999,250 GR. )r,~ 999 250 ClMP.DTE 250 CILM.DTE 250 IMQF.DTE 25O IIXM DTE 250 TENS:DTE 250 GR.CSG 438 HTEN.CSG 250 CIMP.DTE 250 CILM.DTE 250 IMOF'DTE 250 IIXM,DTE 250 TENS.DTE 50 GR,CSG 38 HTEN.CSG 250 CIMP.DTE 250 CILM,DTE 250 IMQF.DTE 250 IIXM.DTE 250 TENS.DTE 250 GR.CSG 000. HTEN,CSG 250 ClMP.DTE 50 CIL~.DTE 50 IMOF.DTE 250 II×M.DTE 250 TEN'S.DTE 250 GR.CSG 938 HTEN.CSG 25 o C I L ~ 250 I~QF 250 IIXM.DTE 250 TEMS.DTE -999,250 -999 250 -999 250 -999 250 -999 250 28 063 839 500 -999 250 -999 250 -999 250 -999 250 -999 250 25 846 500 '999.250 :999,250 999,250 -999,250 -999,250 35,0~ 830,500 -999,250 -999,250 -999,2 0 -999,~ 0 -999, 50 25,000 781,500 -999 250 -999 250 -999 250 -999 ~50 -999 50 30 531 835 000 ~999.250 999,250 '999'250 :999.250 999,.250 ~8,734 833,500 -999 250 -999 250 -999 250 -,,,o -999 .IS TaDe variflcat:lon List:[nc~ :~-HAY-1991 22:58 PAGE: 19 icblumberqer AlasKa Comput:[ng Center .gTF~( DTE -999.25n ~RES.DTE -999.250 HTE~i.DTE -999 250 GR CSG 29 06] TFNS* . g~ ~ * ' .CSC 2030,000 ~RES C.u 2.246 t~TE~,CSG DEPT. 3400.000 CIDP.DTE -999.250 IDPH,DTE -999.250 CI~P.DTE -999,250 I~P~.DTE -999,250 CILO.DTE '999.250 ILO,DTE -999.250 CILM.DTE -999.~50 IL~.DTE -999,250 IF~,~TE -999 250 IDQF.DTE 999 250 IMOF.DTE '999,250 IIRD. DTE -999,250. IIXD. DTE -999:250 II~.DTE. 2999.' 250 IIXM.DTE -999, 250 SFL~.DTE -999.250 SP.DTE '999.250 GR,OTE -999.250 TENS.DTE '999.250 NTE~.DTE -999,250 ~RESoDTE '999.250 MTED.DTE -999 250 GR.CSG R9,047 TENS.CSG 2035,000 ~RES,CSG 2.266 ~TE~.CMG 79:813 HTEN.CSG 80~.500 DEpT 3300,000 CIDP [~TE '999,250 IDP~.DTE -999.250 CI~P. DTE IMPH.'DTE -999,~50 CILD.'DTE '999.250 ILD,DTE -999.250 CILM.DTE IL~~ DTE -999.250 IFRE. T~ '999 250 IDQF.DTE -999 250 IMQF.DTE IIRD."DTE -999,250 IIXD.DTM '999.250 IIR~,DTE -999."250 IIXM.DTE SFbU.DTE -999,250 SP. DTE -999 250 GR.DTE -999.250 TENS.DTE ~4TE~. DTE -999,250 MRES.DTE -999:250 HTEN,DTE -999.250 GR,CSG TEMS.CSG 1985.000 ~-~RES. CSG 2.299 MTE~!, CSG 79. 188 HTEN.CSG OEpT ]200.000 CIDP.DTE -999.250 IDPH.OTE -999.250 CIMP.DTE IMP~DTE -999,250 CILD.DTE -999,250 ILO DTE -999.~50 CIL~.DTE IL~..DTE -999,250 IFRE.DTE -999.~50 IDQ~:DT~ -999 250 IMQF.DTE IIRD,DTE -999,250 IIXD.DTE -999,250 IIR~.!,OTE -999:250 IIXM,DTE SFLU.DTE -999.250 SP,DTE -999,250 GR,DTE -999,250 TEN$.DTE MTE~.DTE -999,250 MRE$,DTE -999.~50 HTEN,DTE -999,250 GR CSG TENS.CSG 1860.000 MRES,CSG 2,289 ~TE~,CSG 78.688 ~TEN~CSG DEPT. 3~00 000 CIDP DTE -999 250 IDPH.DTE IMPW DTM 99:250 CIbn' -9 ~ ~ - ~..DTE 99:250 ILi).DTE IL~:DTE -999,250 IFR~:DTE -999.250 IDQF,DTE IIRD.DTE -999,250 IIX DTE -999.250 IIR~I,DTE SFbU,DTE -999,250 SP.DTE -999,250 GR,DTE MTE~.DTE -999.~50 MRES.DTE -999.250 HTEN,DTE TE~S.CSG ~885.000 ~RE$.CSG 2,320 MTE~,CSG DEPT. 3000.000 CIDP.OTE IL~.DTE 99.250 IIRD.DTE -999,250 I!XD.DTE SFLU.DTE 999 250 SP T : ~ MTE~.D E 999,~50 ~RES.DT~ TENS.CSG 1790,000 ~RES.CSG DEPTIMpH, ~900,~00~ CIDP. DTE .DT~ 999.250 CILD.DTC IL~.DTE ~999,~5o IFRE.DTE IIRD.DTE 999.250 II×D.DTE SFLU,DTE '999,250 ~P DTE MTE~.!.PTK 999,250 ~RES,OT..~'~' F TENS,CSG ~760,000 SRES,CSG DEPT. 2800.000 CIDP.DTEi INP~.DTE -999.~50 CILD.DTE I5~.DTF '999.250 IFRE.DTE IIPO.DTE -999'250 IIXD,DTE -999 250 -999 250 -999 250 -999 250 -999 250 -999 250 2,408 999, 0 -999, '999.250 '999,250 2,428 -999,250 -999,250 '999,250 -999,250 IDPM,DTE I~D.DTE ID F,DTE II~,DTE T~ GR.D.E NTEN,DTE MTEM,CSG IDPH,DTE ILO.DTE IDDF,DTC IIR~g,DTE GR,DTE HTE~'~,DTE MTE~,CSG IDPH, DT~ IL~, , DTE IDOY,DTE IIR~i,DTE -999 250 -999 250 -999 250 -999 250 -999 250 -999 250 78 250 ~999i250 999.250 -999 250 -999.250 -999'2~0 -999,250 78.125 '999,250 '999.'250 '999.250 '999,250 '999,~50 '999.250 78.000 -999 250 -999~250 999 250 : 92 so CIMP.DTE CIS~'DTE IMQF,DT£ IIXM.DTE TENS,DTE GR'CSG HTEN.CSG CIMP,DTE CILM.DTE IMQF,DTE IIXM.DTE TENS,DTE GR,CSG HTEN,CSG IPDTE ILM:DTE IMOF.DTE IIXM.DTE TENS.DTE GR.CSG HTEN.CSG CIMP.DTE CILM,DTE IMQF.DTE IIXM.DTE -999 ~50 -999 50 -999 250 -999 250 -999 250 30 656 797 500 -999,250 -999,250 -999,250 -999,.250 -999,2'50 35,~13 807.000 '999,250 50 '999,250 '999'~50 '999, '999, 50 26.~69 818'500 999,250 :999,.250 -999'250 -999~250 '999,250 [7,~50 804,500 '999,2 0 '999,2~0 "999,50 '999,~50 '999.250 22;547 795,500 '999,250 '999*250 :999,250 999,250 ,IS ~ac,~ Vertflcat. ion [,ist'Jnq ;Chlumber'~]er ~lasKa Com.utInq" o .. Center 2-~.~AY-199! 22:5~ PAGE: 20 DEPT, 2700.600 CIDP.DTE IMPW,DTE -999,250 CILD,bTE IL~.DTE -999,250 !FRC,DT~ IIRD,DTE -999,~S0 IIXD,DTE SFLU.DTE -999,250 SP.DTE MTE~.DTE -999,250 ~RE$,DTE TEN$.CSG 1790,(;00 ~RE$.CSG D~PT, 2600,000 CIDP,DTE I~P~.DTE -999,250 CILO,DTE IL~,DTE -999,250 !FR~,DT~ IIRD.DTE -999,250 IIXD.DTE SFLU,DTE -999,250 SP,DTE MTE~.DTE -999,250 ~RES.DTE T~NS,.CSG 1020.000 !~RES.CSG DEPT. 2500.000 CIDP,DTE I~PH,DTE -999,250 CILD,DTE IL~ DTE -999,250 IFRE"DTE IIRD'DTE. -999,250 II~D,DTE SFL!.~,DT~ -999,250 SP,DTE MTE~.I)TF -999,250 NRES,DTE TENS,CSC 1780,000 gRES,CSG DEPT. 2400,000 CIDP,DTE IMP~,DTE -999,250 ClLD,DTE IL~,DTE -999,250 IFRE,DTE IIRD.DTE -999,250 IIXD,DTE SFLU,DTE -999,250 SP,. TED MTE~.DTE 999,250 ~RES,DTE TENS.CSG i$10,000 ~RE$,CSG DEPT )' 2300 z~P~:[rE -999 ILN.DTE -999 IIRD, CE 999 $FLU. DTE -999 MTE~, ~1, E -999 TENS,CSG ~865, 000 CIDP DTE 250 ClLD:DTE 250 IFRE.DTE 250 IIXD,DTE 250 SP,DTE 250 ~t~E$.DTE 000 P DTE DFPT 200,000 I~P~:DTE 999,250 CILD,DTE Ib~ ,~,'~ ~ 999 250 IF~E DTE IIRD,DTE : '' .... '" 999,250 !IXD,DTE SFLI~,DTE 999 250 SP,DTE SITE5~ , D~ ~ % ' · ' 999.250 ~RES. DTE TE~!$,CSG ~850,000 ~RES,CSG -999,250 G~,D'rE -999,250 TE~iS.DTE -999 250 -999,250 HTEN,OTE -999.250 GR,CSG ~9:344 2,385 ~TEM,CSG 77,438 HTEN.CSG 812,000 -999.250 IDPH.DTE ,,-999! 250 CI~P.DTE :999,250 IbD., DTE 999 250 CIL~. DTE 999,~50 IDQF, DTE 999 ~50 I~OF. DTE -999,250 IIg~,DTE 999,250 IIXM.DTE -999,250 GR,DTE :999.250 TENS,DTE -999,250 HTEN, DTE -999 250 GR,CSG 2,408 ~TEM,CSG 76~563 HTEN.CSG -999 250 -999 250 -999 250 -999 250 -999 250 '999,250 2.438 -999.25O -999,250 -999,250 -999,250 -999,250 -999.250 2,467 999,~50 999. 50 999, 50 999,250 999.250 999,250 2,5i2 -999 250 999 250 :999 ~50 -999 250 -999 250 -999,250 2,557 -999,250 -999,250 -999,250 -999,250 -999,250 -999,250 2,516 IDPH,DTE -999 250 CI~P.DTE ILD,DTE -999:250 CIL~.DTE IDQF,DTE -999 250 I~QF,DTE ~IRM,DTE '999i~50 IIX~.OTE GR,DTE -999 250 TEN$.DTE HTEN,DTE -999 250 GR.CSG MTE~,CSG 76,125 HTEN.CSG IDPH,DTE -999,250 CI~'P,DTE IbD,DTE -999,250 CILM.DTE IDOF,DTE -999.250 IMQF DTE IIRM.DTE ' -999 250 IIX~.DTE GR,DT~ '999i250 TE~S.DTE HTEN,DTE -999 250 G., 'R CSG MTEM,CSG 75,313 HTEN,CSG IDPH.DTE 999,250 CIgP,DTE ISD'DTE :999.250 ClL~.DTE ID~F,DTE -999.250 IMOF.DTE IIR~,DTE -999 250 IIXM,DTE GR,DTE -999i250 TENS,DTE HTEN,DTE -999 ~50 GR.CSG ~TEM,CSG 74,313 HTEN.CSG IDPH,DTE 999 250 CIRP,DTE ILD,DIE %999:250 CILM,DTE IDOF,DTE -999,250 I~QF,DTE IIRN,DTE -999 250 IIX~.DTE GR,DTE -999:250 TE~S,DTE HTEN,DTE -999 250 GR,CSG ~TEM,CSG 73:375 HTEN.CSG IDPH.DTE -999,250 CI~P,DTE ILD,DTE -999 250 CIbM.DTE IDOF,DTE -999i~50 I~QF.DTE IIR~,DTE -999 250 IIXM,DTE GR,DTE -999.250 TEN$,DTE HTEM.DTE -999.250 GR,CSG MTE~,CSG 73..188 HTEN.CSG -999 250 -999 250 -999 250 -999 250 -999 250 3 874 297 500 -999 250 -999 250 -999 250 -999 250 -999 250 23 422 944 500 '999,250 '999,250 '999,250 '999,250 '999,250 21~7~9 913,500 -999 250 -999~250 -999,250 -999,250 '9~9,250 8,156. 963,500 -999 250 -999 250 -999 250 27 313 934,000 -999,250 -999,250 -999.,250 :999,250 999'250 29,~88 992,000 ,IS Tar. e verification bJ. stino ;CblUmberqer Alaska Com~uting Center 2-~A¥-~991 22~58 PAGE{ 21 DEPT. 2100.00~ CIDP.DTE I~P~.DTM -999.250 CILO.DTE IL~.DTE -999.250 IFRE,DTE IIRO.DTE -999.250 IIXD.DTE SFLU.DTE -999.250 SP.DTE ~TE~.DTE -999.25(3 TE~S.CSG 1815,0n0 ~RES.CSG DEPT. 2000.000 CIDP.D'rE I~P~.DTE -999 25(i) CILD.{)TE IL~,DTE -999:250 IFRE.DTE II~D.DTE -999,250 IIXD.I)TE SFLU OT~ -999,250 SP.DTE DTE -999.250 ~RE$.DTE TE~$.CSG 1845.000 ~ES,CSG DEPT. 1900.000 CIDP.DTE IMPH.DTE -999.250 ClLD,DTE IL~.DTE -999.250 IFRE.DTE IIRD.DTE -999,~50 II~D.DTE SFLt},DTE -999.250 SP.DTE MT~.DTE -999.250 ~RES.DTE TEMS.CSG !810.000 ~RES.CSG DEPT. 1800.000 CIDP.DTE I~P~ DTE -999,250 CILD.[)TE -.L~:DTE -999,250 IFRE.DTE II~D,DTE -999,250 IIxD,DTE SFLU.DTE -999,250 SP DTE D~'E -999,z5.~ ~RES.DTE MTE~. ~ TENS,CSG 1690.000 ~RE$,C~G DEPT. !700 000 CIDP.DTE I~PH DTM 99~ n . · ~.. zS.~ CILD DTE Ib~,DTE -999,250 IFRE.DTE IIRD.DTE -999,250 IIXD.DTE SFbI].DTE -999.250 SP.DTE MTE~ DTE 999,250 ~RE$,DTE 000 ~ES,CSG DEDT. I600,000 CIDP.DTE I~PM,DTE -999.250 CILD,tT~.. IL~.DTE -999,250 IFRE.DTC IIRD DTE ~999,250 IIXD.DTE SFLU:DTE ~ 999,250 SP,DTE ~TE~,[>TE 999,250 MRES.,DTE TENS.CSG 1700,000 ~RES.CSG -999.250 IDP~{.DTE 999.250 ILD.DTE ~999.250 IDOF.DTE -999.250 IIR~.DTE -999.250 GR.DTE -999.250 HTE~:.DTE 2.582 ~TE~:.CSG -999.250 IDP~,DTE -999.250 ILO,OTE -999.250 -999.250 -999 250 GR.DTE -999~250 HTE~.DTE 2.625 MTE~,CSG -999 250 '999 0 -999 250 -999 250 -999 2~0 2.5 8 -999,250 -999.250 -999,250 999,250 -999.250 2,66~ -999 250 -999i250 -999 250 -999,250 -99~,250 -99 .250 2.69i '999,250 '999,250 '999.250 999.250 999.250 999,250 2,72~ DEPT. I500.000 CIDP.DTE -999,250 IMPN,DTE -999.250 CILO.DTE -999.250 IL~.DTE -999,25{) IFRE'DTE -999 250 IIR~.DTE -999,250 IIXD.DTE -999 250 SFL{).[:TE -999'250 SP.DTE -999 250 ~TE~.DTE -999,250 ~RE$.[)TE -999 250 TE~}$.CSG 1590.000 ~ES.CSG 2.730 IDP~,DTE ILD,DTE IDQF,DTE IIRM.DTE GR.DTE HTE~ DTE MTE~,CSG IDPH,DTE ILD,DTE IDOF,DTE IIRM,DTE GR,DTE HTEM.DTE MTE~.CSG IDPH,DTE ILO,DTE IDQF,DTE IIR~,DTE 'GR.DTE MTE~!~DTE MTE~.CSG IDPH,DTE IbD,DTE IDQF,DTE IIRi~,DTE GR,DTE HTEi~,DTE MTE~i,CSG IDP~,DTE ILD.DTE IDOF,DTE IIR!~,DTE GR,DTE HTE~,DTE ~TE~.CSG 999.250 99 250 -999 250 -999.250 71.750 -999 250 -999 25O -999 250 -999 250 -999 250 -999 250 7O 75O -999 250 -999i250 -999 2SO -999.250 -999.250 -999.250 70,563 -999.250 -999 50 -999 -999:.50 -999,250 69,688 -999 250 -999 250 -999 250 -999 250 -999 250 -999 250 68 750 -999.250 -999.250 -999.250 -999 ~0 -999 250 67 875 -999.250 -999 250 '999i~50 -999 250 -999 250 -999 250 67.o63 CI~P.DTE ClLM.DTE IMQF.DTE IIXM.DTE TENS.DTE GR.CSG HTEN.CSG CIMP.DTE CILM,DTE IMQF,DTE IIXM.DTE TEN$.DTE GR.CSG HTEN,CSG CIMP,DTE ClL~.DTE IMQF DTE IIXM DTE TENS DTE GR CSG HTEN CSG CIMP.DTE CILM,DTE IMOF.DTE IIXM.DTE TENS.DTE GR,CSG HTEN,CSG CIMP,DTE ClLM.DTE IMOF.DTE IIXM,DTE TEES.DTE GR.CSG HTEM.CSG ClMP.DTE CILM.DTE I~QF.DTE IIXM,DTE TENS.DTE GR.CSG HTEN,CSG CI~P.DTE CILM.DTE I~OF.DTE I!X~.DTE TENS.DTE GR.CSG MTEN.CSG -999.250 -999,250 -999,250 '999,250 -999,250 28.45] 974,000 -999 -999 -999 250 -999 250 -999 250 33 031 1003 000 -999,250 '999,250 '999,250 '999,Z50 30,375 1050,000 :999,250 999,250 '999'250 :999. 50 999'~50 23,28! 1053,000 -999~.250 '999,'250 ~999 250 '999 250 1089 000 2999,250 ~999~250 '999.250 '999'250 21.,297 1097'000 -999,250 -999,250 :999,250 .999,250 999'250 15,008 1093,000 ,IS Ta~e Verif!.catio~ 1...istlm~. ;¢hlumber~er AlasKa Con~putim~: Cemter 22:58 I~PH.DTE 999:250 CIL[).[..~E~' ' 999 IL~.DTE 999.250 IFRE.DT~: '999 IIRD.OTE ~999.250 IIXO.DTE -999 SFL[i DTE -999.250 SP.DTE -99~ MTE~:DTE -999.250 ~RES.!)TE -999 TENS.CSG 1665.000 NRES.CSG 2 . ~T~ DEPT ~' 1300.000 CIDP.D 'E 999 I~P~4.£~M -999'250 CIbO.DTE 2999 IL~.DTE -999.250 IFRE.DTE -999 IIRD DTE -999.25u IIXD DTE -999 SFLU'DTE -999.250 SP'DTE -999 ' MTE~.DTE -999.250 ~RE$,DTE -999 TENS.CSG 1630.000 MRES,CSG IL DTE 999 250 CILM.DTE 2~0 lDO DTE 999 250 i~OF.DTE .250 IIRM,DTE 999 250 IIXM.DTE .250 GR,DTE 999 250 TENS DTE .250 HTEN.DTE ~999:250 GR:CSG .807 ~TE~.CSG 65.313 H.EN, T'~ CSG ,250 IDPH.DTE .250 ILD,DTE .250 IDOF,DTE 250 IIRM.DTE ~250 GR'DTE .250 HTEN.DTE ,816 MTEM,CSG DEPT. 1200,000 CIDP.DTM -999,250 IDPH.DTE I~PH DTE -999,250 CILD,DT~ -999.250 ILD,DTE IL~DTE -999 25{'3 IFRE.DTE -999.250 IDOF.DTE IIRD DTE -999:~50 IIXD.DTE -999.250 IIRM,DTE SFLU'DT~ -999,250 SP.DTE -999 250 GR,~-TE MTE~.DTE -999,250 MRES.DTE -999:250 MTEN,DTE TM~S.CS~ ~625.000 aR~$.CSG 2.836 ~TEM,CSG DEPT 1100,000 CIDP.DTE -999 IMPH:DTE -999,250 CILD'DTE -999 IL~.DTE -999.250 IFRE.DTE -999 IIRD.DTE -999.250 IIXD,DTE -999 SFLU.DTE -999,250 SP.DTE '999 MTE~ DTE -999,250 ~RE$,DTE -999 TENS:CSG 15~0,000 ~RES.'CSG 2 DEPT. I000,000 CIDP DT~ -999 IMP~ DTE -999,250 CILD:DTE -999 IL~'DTE . -999,250 IFRE.DTE -999 IIRD.DTE -999,250 IIXD,DTE -999 SFLU.DTE -999.250 SP,DTE -999 ~TE~i.DTE -999,250 MRES.DT~ -999 TENS,CSG 1585.000 ~RES.CSG 2 DEPT 993,000 CIDP,D~.w · D~, 999 I~PM.DTE -999,250 CILD, ....... -999 ILN.DIg -999.250 IFRE,DTB 2999 IIRD,D.E -999,250 IIXD.DTE 999 MTE~.DT`L -999,250 ~PE$'DTE -999 TES$.CSG 1.525,000 MRES.CSG 2 ** gNP OF DATA ** ,~50 . 50 , 50 ,250 ,~50 , 75 25O 25O 5O 25O ,250 .904 .250 ,250 ,250 .250 .250 .250 ,900 IDPH OTE I LD: DTE IDOFi DT~: I'IRM,DTE GR,DTE HTEN ' DTE MTEM, CSG IDPH,OTE ILD,DTE IDQF,DTE IIRM'DTE GR,QTE HTEN,DTE MTEM,CSG IDPH,DTE ILD,OTE DTE IDQF,D ., IIRM~TE GR,DTE HTEN,DTE ~TEM,CSG -999 250 -999 250 -999 250 -999 250 -999 250 -999 ~50 65,063 ~999.250 999.250 '999 250 -999 250 -999 250 -999 250 64 250 -999,250 -999,250 -999 250 -999 250 -999 25O -999 250 63 531 -999 250 -999 250 -999 250 -999 250 -999 250 -999 250 63,281 -999.250 -999.250 -999.250 -999,250 -999.250 -999.250 62,875 CI~P.DT£ CII. M,DTE IMQF,DTE IIX~.DTE TENS.DTE GR,CSG HTEM,CSG CI~P.DTE CILM.DTE IMQF.DTE IIXM.DTE TEN$.DTE GR.CSG HTEN,CSG CI~P,DTE CILM,DTE IMOF,DTE IIXM,DTE TENS,DTE GR,CSG H~E~ CSG CI~P.DTE CIL~,DTE I~OF,DTE IIX~,DTE TE~$.DTE GR.CSG HTEN,CSG CIMP,DTE CILM,DTE IMQF DTE IIXM:DTE TEMS,DTE GR,CSG HTEN.CSG -999,250 -999,250 -999,250 -999,250 -999.250 25,078 1129,000 -999.250 -999.250 -999,2~0 '999,250 261 25 1143,000 '999,250 '999.250 -999 250 -999 250 -999 .250 19 297 1125 000 -999,2S0 -999'250 -999,250 -999,2~0 -999'250 27'688 I161,000 '999,250 '99~250 '99 ,250 '999,250 1175 0 -999 250 -999 250 -999 250 -999 250 -999 250 36 500 1174 000 .IS Tane verlf~cation [,istinq ~chlumber~er Alaska Co.~outinq Center 2-~-AY-1991 22:5~ PAGE: 23 **** FILE TRAILER **** F%LF ~A~E : EDIT .001 SFRVICE : FLIC VERSION : 00l~06 D~T5 : 91105/ 2 ~AX PEC S~ZE : ~024 FILF TYPE : b(] L~ST FILE : **** T~PE TRAILER **** SERVICE MA~E : EDIT D~TF : 91/05/ 2 O~I~IN : FLIC TAPE N~E : 745~7 CONTINUATION # : 1 P~EVIO~S TAPE : CO~E~T : ARC~ ALASKA. INC..KUPARU~ R1VE~.IL - 20X,50-029-22157-00 **** REEL TRAILER **** SErvICE MA.~E : EDIT DATE : 91/05/ 2 O~ICIP~ : FLIC REEL NA~E : 745'37 COMTINUATIDM # : COMMENT : ARCO AI. ASKA. INC..K[]PARUK R1VER.1L - 20X.50-029-22~57-00 ALASKA COMPUTING CENTER COMPANY NAME ) ARCO ,ALASKA, INC, WELL NAME j ! FIELD NAME J K RIVER UNIT BOROUGH j NORTHi~SLOPE STATE : AL~SKiA AP1 NUMBER ~ 50-0~9-22157 REFERENCE NO :74524; ECEI vED 8 1991 Oil~A~n~cSh Co''t ~"--°nSrag~ IS ~e veri~ication t, ist}nq chlumbel'oer laska Comput nq Center 29-APR-19gl 11:11 DATE : 91104/29 ORIGIN : FbIC REEL NAME : 74524 CONTINUATION # : PREVIOUS REEL ~ COMMENT : ARCO, 1L-2OX, KUPARUK RIVER UNIT, 50-029-22157 **$* TAPE HEADKR $*$* DATE : 91104/29 ORIGIN : KLIC TAPE NAME : 745~4 CONTINUATION # ~ 1 P~KVIOUS TAPE : COMMENT : ARCO, 1L-2OX, KUPARUK RIVER UNIT, 50-029-22157 *$*~ FILE HEADER **** FILE NAME : EDIT ,001 SERVICE : FLIC VERSION : 001A06 MAX REC SIZE : 10~4 FILE TYPE : bO LAST FILE ~ COMPANY NAME: ARCO ALASKA, INC, WKLL: !L-20X FIELD: KUPARUK RIVER UNIT BOROUGH: NORTH SLOPE STATE: ALASKA API NUMBER: 50-029'22157 LOCATION: 74' FSL & ~6' FWL SECTION: 29 TOWNSHIP: PERMANENT DATUM: MSL ELEVATION: 0 RANGE: IOE IS TaLe Verification hlsting chlumherger AlasKa Comoutln~ Center 29-APR-1991 11:11 LOG MEASURED FROM D~ 129 ELEVATIO~4S KB: 129 DATE LOGGED: 17-APR-91 RUN NUMBER: ONE TD DRILLER: 11757 TD LOGGER: 11757 ~BOVE PER~ANENT DATUM DF: 129 GL: 88 CASING: 9.625 36 LB ~ PRl[~tER DEPT~{ OF 6044 BIT SIZE: 8.5 TYPE FBI]ID IN HOLE: LSNP DENSITY: 10,6 PH: 10,2 VISCOSITY: 45 FLUID LOSS: 6 3,24 g 85 MUD RESISTIVITY: FTLTRATE RESISTIVITY: TIME CIRCULATION ENDED: 15:30 20-APR ~AXIMUM TEgP RECORDED: 131 LOGGING DISTRiCT~ PRUDHOE BAY/4210 LOGGING ENGINEER: PERRY TOOL NUMBERS~ RGS022 NDS037 FIELD REMARKS: BIT RUN ONE: DRILLED INTERVALD6040' TO 1~757' GA~A RAY READING 75.25' T RESISTIVITY READING 64,859EHIN BI BEHINDB IT DENSITY READING 131,99' BEHIND BIT NEUTRON READING 138,23' BEHIND BIT DENSITY MATRIXm 2,65 G/CC FLUID DENSITYm ~,0 G/CC MAXIMU~ HOLE ANGLE= 69,2 ~9190 DATE JOB STARTED: 25.-APR-91 JOB REFERENCE NO: 74524 LDP/ANA: KOHRING PAGE: FILE - EDIT,O0I ARCO ALASKA INC, ~UPARUK RIVER UNIT lb-20X 50-029-22157 MAIN PASS LWD bOG DATA IS Tame Verification blsting chlumberger AlasKa ComDuti. nq Center 2q-APR-1991 11:11 DATA SAMPLED EVERY -.5000 FEET DATA INCLUDED - TOOL EXTENSION TOOL TYPE USED NAME RG$ .bWD LOGGING WHILE DRILLING RESISTIVITY/GR 5968' TO 11694' ~)DS .LWD LOGGING WHILE DRILLING NEUTRON/DENSITY 5914' TO 11627' TABLE TYPE : CONS TUNI VALU DEFI CN ARCO ALASKA. INC. Compan Name ame WN lb-20X Well Name APIM 50'029-22157 API Serial Number FL 74' F$5 & 216' Fwb Field Location SECT 29 Section TOWN lIN Township RANG tOE Range COUN NORTH SLOPE County STAT ALASKA ' State~ or Province MAT! USA Nation PDAT MSL Permanent datum EPD FT' ~ Elevation of Perm.~ Datum LMF ~ bog Measured FrOm B FT 129 Elevation of Kelly EDF FT 129' Elevation of DerricK'Floor ' Elevation of Ground bevel TDD FT 11}57 Total DepthI Driller TDL FT 11757: Total, Dept~ Logger BSI FT 11757,. BOttom LOg Interv&l TLI FT 6040. ToD boq Interva) DFT LSNP Dr~lll~ FlUid DFO G/C~ 10,6 Drillin6 Fluid Density DFPN 1.0,2 Drlllin~ Fluid Ph DFV S 43, Drillin~ Fluid ¥is~osit~ DFL F3 6, Drilltng...Fluid ~oss R~S OH~ 3 24 ResiStivity o~ Mu~ Sample ~ST DEGF B§ ~ud. Sam le Temperature ~' ~ ~3 Reslsti~. ity ot mud filtrate ~S OHM~ ErST D~F ~ Mud Filtrate Sample Temperatu rCS 15!30 20-APR Time Circulation~.toPPed B~T DEGF 13I, Bottom Hole Temperature IS Tape verification Listing chlumber~er Alaska Computimg Center 29-APR-1991 11:11 TABLE TYPE : CURV DEFI D~PT Depth Channel Name G~ Gamma Ray P~F Photoelectric Factor TNPM Thermal Neutron Porosity DPOR Dens!tF Porositv output from an APplication Program DPg~ DensltF Porosity ROS2 SS2 RHO t LDT Dens! ¥ - R~OB Sulk Denstty DRHO Delta RHO ATR RGS BHC ATTENUATION RESISTIVITY PSR RGS BHC P~ASE SHIFT RESISTIVITY DER DIELECTRIC RESISTIVITY FROM RGS DCAI, Differential Callper ROPE RATE OF DRILLING PENETRATION PAGE~ ** DATA FORMAT SPECIFICATION RECORD ** SET TYPE - 64KB ** TYPE REPR,CODE YAbUE ! 66 0 ~ 66 0 4 66 ~ 5 66 7 65 1 66 1~ 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 0 ** SET TYPE - CHAN ** NA~E SERV UNIT SERVICE APl API API AP1 FIbE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CbASS MOD NUmB SA~P EbEM CODE (HEX) DEPT FT O0 000 O0 0 ! ! 1 4 68 0000000000 GP LWD GAPI O0 000 O0 0 I ! I 4 68 0000000000 P~F LWD O0 000 O0 0 i 1 1 4 68 0000000000 Tape verification Llstinq chlumberqer AlasKa ComputinQ Center 29-APR-1991 11:11 PAGE~ NA~.E SER UNIT S R CE API A ID ORDER # bOG TY TNPM LWD. PU O0 0 DPOR LWD Pt; O0 0 DPHI LWD PU O0 0 ROS2 LWD G/C3 00 0 R[~OB LWD G/C3 O0 0 DDHO LWD G/C3 O0 0 hTR LWD OHMM O0 0 PSR LWD OHMM O0 0 D~R [.WD OHMM O0 0 DCAL 5WD I~ O0 0 ROPE LWD F/HR O0 0 ** DATA ** =.o.. DCAL.LWD -99 250 ROPE. I API API F PE CbASS MOD N O0 O0 0 O0 O0 0 O0 O0 0 O0 O0 0 O0 O0 0 O0 O0 0 O0 O0 0 O0 O0 0 O0 O0 0 oo O0 0 O0 O0 '- 0 LWD -999 250 LWD -999:250 LWD -99~,250 bWD 2 .228 DEPT 11700,000 GR. LWD -999,250 DPO, :SWD -999. 250 DPHI.bWD -999.250 D~HO.LWD -999,250 ATR,LWD -999'~50 DCAL'.LWD -999,2§0 ROPE.LWD ' 20.374 DEPT. 11600 000 GR.bWD DPOR,LWD 5 658 DPHI,LWD DR~O.LWD 0 037 ATR.LWD DCAL.LWD 0 6~7 ROPE.LWD DEPT. 11500.000 GR.LWD DPO~.LWD 13'481 DPHI,DWD DRHO.LWD 0,023 ATR,LWD DCAL.LWD 0,299 ROPg. LWD DEPT. 11400.000 GR.LWD DPO~.LWD 9.912 DPHI,LWD DRHO.LWD 0,010 ATR.LWD DCAL.LWD 0.258 ROPE.bWD DEPT. 11300.000 GR.LWD DPOR.LWD 17.160 DPHI.LWD DR~O.LWD 0.005 ATR.LWD DCAL.LWD 0.101 ROPE.LWD i E NUMB MB SIZE REPR PROCESS UMB SAMP ELEM CODE (HEX) 1 1 1 4 68 O000000000 1 1 I 4 68 0000000000 1 1 1 4 68 0000000000 1 1 1 4 68 0000000000 1 1 1 4 68 0000000000 1 I ! 4 68 0000000000 1 1 1 4 68 0000000000 I I 1 4 68 0000000000 1 I 1 4 68 0000000000 1 1 1 4 68 0000000000 I ! 1 4 68 0000000000 D~PT, 11200,000 GR.LWD DPOR,LWD 16,286 DPHI,LWD DR~{O.LWD 0.008 ATR.LWD DCAS..LWD 0.022 ROPE.LWD 92,632 5,658 ,5 61 4 ,098 128.397 13,48! 3,502 84,1!0 245,248 9,9~2 2,7 7 61.852 PEF.LWD -999.250 TNPH.LWD ROS2.SWD -999.250 RHOB.LWD PSR.LWD -999.250 DER.LWD PEF,bWD 3 241 TNPH.bWD ROS2,LWD 2i557 RHOB,,LWD PSR.bWD 4 276 DER,LWD ~PEF.,bWD 2.~979 TNPH.bWD ROS2,bWD 2,428 RHOB,SWD PSR,bWD 4.282 DER.LWD PEF,LWD 3 461 TNPH.bWD ROS2.LWD 2!486 RHOB.L~D P$~,LWD 3 793 DER.LWD '999,250 '999,250 '999,250 '9gg ~250 'ggg 250 "999 250 45.935 948 197.4~3 PEF,bWD 2.888 TNPN.L'WD 4~-,' 06 17,1 0 ROS2.bWO 2 3~67 R.OB~bWD 67 3.700 PSR.LWD 142,t34 PEF.LWD 3.~24 TNPM LWD ROS2,bWD 2. 81 RNOB:LWD PSR.DND 6.829 DER.LWD 168, 16.~ 6 i0~ ,976 .894 4~,.?10 ,38! 6'247 I$ Ta~e Verification 6istlno ch].~mber~et AlasKa Comout~n~ Center 29-APR-1ggl 11:11 PAGE: D~PT, 11100,000 DPOR,LWD 16,117 DPHI.bWD DCAL.LWD 0,121 ROPE,DWD DFPT. 11000.000 GR.LWD DPOR.LWD 1],364 DRHO.LWD 0.000 ATR.LWD DCAL,LWD 0,071 ROPE.bWD D~PT. 10900 000 GR.LWD DPOR.LWD 7~571 DPHI,LWD D~HO.SWD -0.003 ATR.LWD DCAb. DWD 0,330 ROPE.LWD D~PT 10800.000 GR.DWD DPOR:DWD 13 455 DPHI,LWD D~HO.LWD 0~007 ATR.LWD DCAL.bWD 0.115 ROPE.LWD DEPT. 10700.000 GR.LWD DPOR.LWD 19.427 DPHI.LWD DRHO.LWD 0,003 AT~.LWD DCAL.LWD 0.137 ROPE"LWD o oo.ooo DRMO,'LWD 0 08 A?R,LWD DCAL,LWD 0,292 ROPE,LWD DEPT, 10500 000 GR,LWD DP~,SWD ~6 899 D~NI,SWD DRHO,LWD -0 003 ATR,5WD DCAL,LWD 0 134 ROPE,LWD DEPT. 10400.000 ~R.LWD DPOR.,LWD 7.269 DPMI.,5WD DRHO,LWD 0,010 ATR,LWD DCAL,LWD 0,360 ROPE.LWD D~PT. 10300.000 GR,LWD DPOR.LWD 8,927 DPHI.LWD DRHO.5WD 0.014 ATR,LWD DCAb.tWD 0.200 ROPE.LWD DEPT. I0200.000 GR.LWD DPO~.LWD 12.394 DPHI,LWD DRMO,LWD 0,002 ATR'LWD DCAL.LWD 0,188 ROPEiLWD DEPT 10100.000 GR.LWD DPO~iLWD 17,755 DPHI.LWD DRHO LWD -0,002 ATR.LWD DCAL.LWD 0.~40 ROPE.LWD 1~0 064 4, 77 186,630 103.873 13.364 4,018 216,642 98,767 7,571 10.402 223,172 126,499 13,455 6,247 162.878 105 563 19 427 6 720 176 875 , 35 15 ,415 101.~5 16, 9 0~5 106~ 48 7 ~69 20~,581 108,512 8,927 4,037 199.274 143,094 i2,394 3,062 188.370 17. 5 2.563 64,681 PEF.LWD RO$2.LWD PSR,hWD PEF,bWD RO~2,LWD PSR.bWD ROS2ibWD PBR LWD PEF,LWD RP$~,SWD PF,LWD ROI2,LWD PSR,LWD i i~ .,SWD P! bWD P~ 5WD , P~F, bWD P ,LWD P~F. 5WD Rp~R LWD 0~2, ,LWD PEF.SWD RO82.hWD PSR,LWD PEF,LWD ROS2,LWD PBR.LWD 3.289 2.384 7.386 3.251 2.429 7.006 3 529 938 3 319 2i428 6 741 3.413 .83g 2,709 2,363 6.131 3.14'i 2; 371 5'326 2.946 O6 503 5'227 2:312 446 4,79! 2.752 2..357 5.478 TNPH.LWD RHOB.LWD DER.LWD TNPH.LWD RHOB.bWD DER.LWD TNPH LWD RHOBi~WD DER LWD TNPH.SWD RHOB,bWD DER,LWD TNPH.LWD RHOB.LWD DER,LWD TNPH.LWD RHOB*LWD DER,LWD TNPH.LWD RHOB.LWD DER,LWD TNPH,LWD RHOB.~WD DER,LWD TNPH.bWD RHOB,LWD DER,bWD TNPH,LWD RHOB,LWD DER;LWD TNPH.LWD RHOB,LWD DER.LWD 84 6'726 405 8:525 4O0 39.786 ,582 , 71 4,870 35,208 · ,5 '03 ,835 39,702 ,4 46 ,837 4,357 ,778 Tape verification Listinq chlumberqer AlasKa Comuutino Center ~9-APR-1991 11:11 PAGE' DEPT. 10000.000 DPOR.LWD 12.082 DRHO.LWD -0.006 DCAL.LWD 0.144 DEPT. 9900.000 DPO~.GWD !4.3!9 DRHO.LWD 0.000 DCAL.LWD 0.097 DEPT. 9800,000 DPOR.LWD 13.605 D~HO.LWD 0.001 DCAL.LWD 0.116 DEPT. 9700 000 DPO~.LWD 17:465 DRRO bwO -0 003 DEPT. 9600 000 DPOR,LWD 17:696 DRHO,LWD 0.0!5 DCAL.LND 0,117 DEPT, 9500.000 DPO.,LWD 102:825 DRHO.LWD 004 DC~5,LWD O. 148 DEPT. 9400.000 DPO~.LND 13,362 DRHO.bWD 0.003 DCAL.LWD .0,334 DEPT. 9300..000 DPOR.LWD 17.155 DRH~ bWD 0,004 DCAL:LWD 0,102 DEPT. 9200 000 DPOR.LWD 21~925 DRHO.LWD 0.056 DCAL.LWD 0,098 D~PT, 9100,000 DPOR,LWD 14,589 DRNO.LWD 0,015 DCAL,~WD 0,160 DEPT. 9000.000 DPOR.LWD 15.748 DRHO,bWD 0,023 DC&L.LWD 0.194 ~R.bWD DPHI.LWD ATR.LWD ROPE.LWD GR.LWD DPHI.LWD ATR.LWD ROPE.LWD GR.LWD DPHI.LWD ATR.LWD ROPE.LWD GR.LWD DPHI.LWD ATR DWD ROPE:bWD GR LWD DPHI:LWD ATR.LWD ROPE*LWD GR LWD DPHI:LWD ATR.LWD ROPE,LWD GR.L~D DPHI.LWD ATR,LWD ROPE.LWD GR,bWD DPHI-.LWD ATR,bWD ROPE,LWD GR.LWD DPMI.LWD ATR.LWD ROP~.LWD GR.LWD DPHI,LWD ATR.LWD ROPE.LWD G~.LWD DPHI*LWD ATR.LWD ROP~.LWD 131,843 12,082 5.835 93.217 130 263 14!319 3'052 172 081 139,906 13,605 69 120,769 !7,465 .377 13 ,913 1!,5~3 117',6 6 188, 6 12~,188 1 .825 4.~44 206.65 120 400 i3 362 2 13 280 132,21! 17,155 19~ '978 ,263 57573 3,652 153,538 5 .4 07 ~4 ,44~ 78.716 15.748 3,378 191,346 PEF.LWD ROB2,bWD PSR.LWD PEF.LWD ROS2,LWD PSR.LWD PEF,bWD RO$2,SWD PSR,LWD PEF,LWD ~OS2.LWD PBR,bWD PEF,LWD RO$2,SWD PSR.bWD PEF,LWD ROS2,bWD PSR,bWD PEF,bWD ROS2,LWD PSR,LWD. PEF.bWD RO$2,LWD P&R'bWD P~F.bWD RO$2,BWD PSR.bWD PEF,LWD RO$2,LWD PSR.LWD PEF.LWD ROS2,LWD PSR,LWD 2,993 2,451 17,260 3,280 2.414 7. 230 3 7 4.973 2. 958 2,.362 6.110 2.~34 2, 58 3,753 .974 'tO 2 869 2~ .367 4,269 2,492 ,288 2.749 .409 '450 2 102 111 9o 2,846 TNPH.LWD RHOB,LWD DER.bWD TNPH.LWD RHOB LWD DER:LWD TNPH LWD RHOBiLWD DER LWD TNPHLWD RHOBiLWD DER LWD TNPH,LWD RHOB,LWD DE~.LWD TNPH LWD DER.LWD TNPH*LWD RHOB.LWD DER,SWD TNPM.LWD R~OB LWD ER:SWD TNPH.bWD RHOB,LWD DER.LWD TN'PH.LwD R~OB.LWD DER.LWD TNPH,LWD RHOB.LWD DER,LWD 32,170 2,451 14,083 43,23! 2.4~4 6,401 43,210 ,426 ,705 64m 4!,528 ,430 ,295 41,381 ,367 3,604 569 2,390 2,994 IS Tame Verlfl. catlon bistlnq chlumberqer AlasKa ComDutlnq Center 29-APR-tg91 11:11 PAGE: DEPT. 8900.000 GR.LWD DPOR.LWD 14.840 DPHI.LWD DRHO.LWD 0.015 ATR,LWD DCAL.L~D 0,155 ROPE.LWD DEPT. B800.000 GR.LWD DPOR.bWD 20,345 DPHI,LWD D~HO,LWD 0.014 ATR,LWD DCAb,LWD 0,091 ROPM.LWD DEPT, 8700 000 GR.LWD DPOR.LWD 17:419 DPHI,LWD DRRO.LWD 0.011 ATR,LWD DCAL.LWD 0,207 ROPE.LWD DEPT. B600,O00 GR,LWD DPOR'LWD 20,474 DPHI,LWD DRHO,LWD 0.023 ATR,LWD DCAL.LWD 0.087 ROPE.LWD D~PT, 8500,000 ~R LWD DPOR,LWD 19,434 DPHI;GWD DRHO.LWD 0.012 ATR,LWD DCAL.LWD 0.038 ROP~,LWD DFPT, 8400,000 GR,LWD DPOR.LWD I6.874 DPHI.LWD DRHO,LWD 0,019 ATR.LWD DCAL.LWD 0,102 ROP~,LWD DEPT. 8300 DPO~,LWD 18 DCAL,LWD 0 1 840 RO$~,GWD 79 033 P~F, bWD 20~,345 RO$2,5WD ],13B PSR.LWD 181.672 B0.44B P'!'F 5WP 17,419 R~i !2 5wP 2.410 P~R bWD 243,413 B4,179 P~F.bWD 20,474 RO 2,LWD 3"2~7 PSR,SWD 184.5 9 P~F,bWD l'lli RO$2.,~WD 301,898 ' $ 92 I~ ~ RoI~Pi:F'bWDb 74 , WP' 000 GR,LWD 85.670 576 DPMI,LWD 18,576 016 ATR.LWD ~,086 094 ROPE,LWD ~1 .99B DEPT, 8200,0 DPOR,L.WD 20,9 DRHO,LWD 0,0 DCAL.LWD 0,0 0 6 0 ,0 00 GR,LWD 7~,49I 08 DPHI~LWD 2 .908 06 ATR,GWD ~,253 10 ROPE,bWD 25 ,468 00 GR.LWD 83. 352 72 DP~I,LWD 19,672 08 ATR, LWD 29 ROPE.LWD 22 .59 DEPT. 8i00 DPO~,LWD 19 DRMO,LWD 0 DCAL,LWD 0 D~PT. 8000,000 GR.LWD 84.566 DPOR,LWD 19.373 DPHI.LWD 19,373 DRHO.LWD 0,009 ATR.LWD 2,834 DCAL,LWD 0,092 ROP~.LWD 206.232 PI~,5WD RO~ ,SWD P~ .SWD p ~F · LW D RD!~ ,~WD P ,LWD P"F,LWD P~iF.LWD RO~2,LWD PSR,LWD DEPT. 7900.000 C.R,bWD 77 934 PEF,LWD DPO~ bWD I9,353 DPHI.LWD 19:93053 RO82,5'WD DRH :LWD 0,00,8 ATR.LWD 2. 0 PSR,LWD DCAL,LWD 0,133 RDPE.LWD 198.520 2.507 TNPH..LWD 36,242 2.405 RHOB.LWD 2.405 3.284 DER,LWD 3.326 2,502 TNpH.LwD 35,735 2 314 RHOB.LWD 2.314 2:792 DER.bWD 2,897 489 TNPH LWD 36,35 ):363 RHOBiLWD 2,36 2,852 DER bWO 2,655 2.446 TNPH.LWD 40,590 3. 26 DER.bWD 2,508 TNPH.bWD 36,$30 3.133 DER,bWD 3. 6 2,645 TNPH,LWD 39,828 ,343 RHOB,~WD 2,343 .907 DER.LWD 2,96~ 584 TNPH.bWD 36.780 :305 RHOB. LWD ,05 2.663 TNPH.LWD 37.,~ 931 2,878 DER,SWD . 2,630 TNPH.bWD 40:'80.? 2,330 RHOB.LWD ~ 330 2.697 DER,LWD ~743 2.627 TNPH. LWD 43,631 2,~ 1 RHOB,LWD IS Tape verification LlstlnQ chlumberqer AlasKa Comoutlmg Center 29-APR-199! 11:11 PAGE: 9 DEPT. 7800.000 DPOR.LWD 20,490 DRHO.L~D 0 021 DCAL.LWD 0:115 DEPT, 7700.000 DPOR L~D 17,342 DrUO:LWO 0.021 DCAL,LWD 0,119 DEPT. 7600.000 DPOR.LWO 19.501 DRHO.LWD 0,006 DCAL,LWD 0,000 DEPT. 7500 000 DPOR.LWD 17:902 D~HO.LWD 0,004 DCAL.LWD 0.207 DEPT, 7400,000 DPOR LWD 11,708 D~HO: [~WD -0.004 DCAL,LWD 0,324 D~PT, 7300 000 DPOR.LWD 16:505 DRHO,LWD 0,007 DCAS,LWD 0,106 DEPT., 7200,000 DPOR,LWD i?,783 DRHO,LWD 0.014 W DCAL'L D 0,219 DEPT,. 7100 000 DPOR LWD 19:946 DRMO:LWD 0,026 DCAL,LWD 0,040 DEPT. 7000.000 DPOR,LWD 20.4~0 DRHO,LWD 0.0 2 DCAL'LWD 0,242 DEPT, 6900.000 DPOR,bWD 18,555 DRHO,LWD 0,026 DCAL.LWD 0,341 DEPT, 6800.000 DPOR.LWD !9.935 DRHO.bWO 0.032 DCAL.LWD 0.493 GR.LWD DPHI.LWD ATR.LWD ROPE.LWD GR.LWD DPHI.LWD ATR,LWD ROPE,LWD GR.LWD DPHI.LWD ATR,LWD ROPE.bWD GR.GWD DPHI,LWD ATR.LWD ROPE.LWD GR.LWD DPHI,hWD ATR.'LWD ROPE.LWD GR,bWD DPMI,LWD ATR.LWD ROPE,LWD GR,LWD DPHI,bWD ATR,LWD ROPE,LWD GR,LWD DPHI,LWD ATR,LWD ROPE'LWD GR.SWD DPMI,LWD ATR,LWD ROPE.LWD GR.LWD DPHI,L~D ATR,LWD ROPE.LWD GR,LWD DPHI.LWD ATR,LWD ROPE.LWD 75 648 PEF,bWD 2.567 TNPN,LWD 3~.555 20:490 ROS2,LWD 2,312 RHOB.LWD ,$12 5.241 PSR,LWD 7 319 DER LWD 6,664 249,850 ' ~4,017 PEF,LWD 2.568 TNPH.LWD 41,794 7,342 ROS2 LWD 2 364 RHOB,LWD 2,364 3,033 PSR:LWD 2~ 981 DER,LWD 2,999 258.754 69.016 PEF,bWD 2 709 TNPH,bWD 35,249 19.501 RO$2.LWD 2:328 RHOB.bWD 3.851 PSR,LWD 4,153 DER.LWD 2,~284. 4~ 262'564 81.495 PEF.LWD 2 695 TNPH.LWD 37,039 i7,902 ROS2,LWD 2:355 RHOB.LWD 3,443 PSR,bWD 3,324 DER.bWD 3,363 266,461 740 PEF.LWD 2.918 TNPH,LWD 3.6,00~ 5 96 PSR,bWD 6,223 DER'LWD 4 256 265 ' ,282 ' 75,265 PEF bWD 2,72t TNPH,~WD 40~988 2 PEF'LWD 2,551 TNPH LWD 40,991 , 7 20, 0 ROS2,SWD 2:~!3 RHOB.bWD 2 3.059 PSR'LWD 2 27 DER.LWD 2, 213.494 78.396 PEF.5WO 2.415 TNPH.LWD 18.555 RDS2,5WD 2.344 RHOB.LWD 2.~44 4.928 PSR.~WO 5.101 DER.bWD 5,u43 2i0,166 61,112 PEF,LWD 2,453 TNPM.LWD 36'~58 19.935 RO$2,L~D 2.321 RHOB,bWD 3.745 PSR,LWD 3 582 DER,L~D ~6~4 281,809 ' IS Taoe Verification [,isting ChlUmberger Alaska Computing Center 29-APR-199! PAGE{ 10 DEPT. 6700,000 PEF,LWD 2 496 TNPH,LWD DPOR.LWD 72i,$89 RO$2,bWD 2~289 RHOB LWD D~HO.LWD 0,027 PSR,LWD 3.709 DER]LWD DCAL.bWD' 0.196 DEPT. 6600.000 P£F.13WD 2.3?23 TNPH.LWD DPOR LWD 16.650 RO$2,LWD 72.375 RHOB bWD D~HO:LWD -0.018 PSR.LWD 6.715 DER:LWD DCAL.LWD 0o281 DRHO.bWD 0,009 P~R. ,bWD 3.870 DCAL.LWD 0.332 : DEPT. 6400.000 P'~.F{ 5WD 2 8i7 TNPH.bWD DRHO.LWD 0,025 PFR bWD 4 697 DER.LWD DCAb. LWD 0.077 DEPT 6300 000 PEF.bWD ~.692 TNPH LWD DPO~!LWD 19i157 RO$2,bWDLW 2.334 RMOBiLWD DRHO bWD 0 009 P~R. D ~.906 DER DCAL.LWD 0.101 - RHOB,hWD D~HO bWD 0 004 P~R bWD 6'349 DER,LWD DCAL bWD 0 097 PI'iF,LWD 2'555 ,bWD DEPT. 5904,000 O :2.LWDP~F -999,250 TNPH..LWD DPOR.LWD -999,250 RI ,LWD -999.~50 RHOB,LWD D~HO,LWD -999,250 P R.LWD -999.~50 DER.LWD DCAL.LWD -999.250 DEPT 6100 000 HO,LWD 0 018 DCAL.LWD 0 077 DEPT, 6000,000 DPOR.LWD 22'033 D~HO.hWD -0~277 DCAL.L'WD 0.488 ** END OF DATA ** GR.LWD 70 563 DPHI.LWD 211889 ATR.LWD 3 698 ROPE.bWD 304~496 GR.LWD 79.734 DPHI.LWD 16.640 ~TR hWO 4.410 ROPE~LWD 197.773 GR.LWD 96,62! DPHI.LWD 18,520 ATR,LWD ~,987 ROPE.LWD 25 ,382 GR.LWD 94.447 DPHI'LWD 1 .554 ATR~LWD 4.523 ROPE,bWD 185.965 GR.bWD 80,660 ATR,LWD ~' 8 ROPE.LWD 22 .319 GR.LWD 7i.556 DP~I.LWD ~9.809 ATR.LWD 5,569 ROPE,LWD 264.437 GR LWD 85,059 OPHI LWD 20.553. ATR LWD ~,475 ROPE LWD 13 '279 GR,LWD 47,525 DPHI,bWD 22,0~ A~.LWD 0,~ RO ,LWD '999, 5~ GR,LWD -999,250 DPHI,LWD -999,250 ATR.LWD '999,250 ROPE~LWD '999,250 0 TNPH,LWD RHOB,LWD DER.LWD RHOB,,LWD DER,LWD 38,938 ,289 ~.705 3~,666 6,3'75 ,165 3"344 ,907 38,077 2,393 4'638 43,!93 ~O'S04 394 54,891 2, 19g01~0'~ 999.,~0 999'250 999,~50 IS Tape verification Listing cblumber~er ~laska Comoutln~ CeNter 29-APR-1991 **** FILE TRAILER **** FILE NA~E : EDIT .001 S~RV!Cg : FLIC VFRSION : 001A06 DAT~ : 91/04/29 ~A× REC SIZE ~ 1024 FILE TYPE : LO LAST FILE **** TAPE TRAILER SERVICE NAME : EDIT DATE ~ 91/04/29 ORIGIN : FLIC TAP~ NAME ~ 74524 ' CONTINUATION # ~ 1 PREVIOUS TAPE COMMENT ~ ARCO, 1L-2OX, KUPARUK RIVER UNIT, 50-029-22157 SERVICE ~AME : EDIT D~TE : 91/04/~9 O~IGIN ~ FbIC REEL NAME ~ 745~4 CONTINUATION # : PREVIOUS REEL : COMMENT : ARCO, 1L-2OX, KUPARUK RIVER UNIT, 50-029-~157 PAGE~ ll