Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAbout186-183Image Project Well History File Cover Page
XHVZE
This page identifies those items that were not scanned during the initial production scanning.
They are available in the original file, may be scanned during the rescan activity or are viewable
by direct inspection of the file.
I (~ ~2- _[ ~Z Well History File Identifier
Organization (done) ,/~ Two-Sided
RESCAN DIGITAL DATA
OVERSIZED (Scannable)
[] Color items: , [] Diskettes, No. [] Maps:.
[] . Grayscale items:
~ Poor Quality Originals:
'~ Other:
[] Other, No/TYpe []
TOTAL PAGES: i~,~ ~ NOTES:
ORGANIZED BY: ~ BREN VINCENT SHERYL MARIA LOWELL
Project Proofing
Other items scannable by
large scanner
OVERSIZED (Non-Scannable)
[] Logs of various kinds
Other
By: Date:
PROOFED BY: BEVERLY BREN VINCENT SHERYL MARIA LOWELL DATE:
Is~
SCANNED BY; BEVERLY BREN VlNCEN ARIA LOWELL
ReScanned (done)
RESCANNED BY: BEVERLY BREN VINCENT SHERYL MARIA LOWELL
DATE: IS~
General Notes or Comments about this file:
PAGES'
Quality Checked (done)
RevlNOTScanned.wpd
Schlumberger
RECEIVED
NO. 3980
OCT 0 4 2006
Company: State of Alaska
Alaska Oil & Gas Cons Comm
Attn: Christine Mahnken
333 West 7th Ave, Suite 100
Anchorage, AK 99501
Alaska Data & Consulting Services
2525 Gambell Street, Suite 400
Anchorage, AK 99503-2838
ATTN: Beth
--\laska Oil & Gas ConS. CCí11ffi-is$içn
Anchorage
Field: Prudhoe Bay
D
Well Job # Log DescriPtion Date BL Color C
L5-28A 11320994 STATIC PRESSURE LOG 07/30/06 1
P2-50B 11212876 LDL 07/17/06 1
H-26 11225990 LDL 07/09/06 1
K-02D 11209593 SCMT 07/20/06 1
J-09A 11321005 LDL 08/29/06 1
D.S. 04-19A N/A INJECTION PROFILE 08/02/06 1
J-06 11321006 PRODUCTION PROFILE 08/29/06 1
G·24 N/A SCMT 08/08/06 1
2-18/L-16 11225986 LDL 07/04/06 1
F-05A 11216212 MCNL 09/03/06 1 1
Petrotechnical Data Center LR2-1
900 E. Benson Blvd.
Anchorage, Alaska 99508
Alaska Data & Consulting Services
2525 Gambell Street. Suite 400
Anchorage, AK 99503-2838
ATTN: Beth
i ôG, - 1753
.,'.,-.", i'!'JNC:"
t~:~\L~;_.~~ '. <"\.' E:, ~-j
II' 0ì Z.. n ¡v:.
,:;i !,,) _v".,
" -
_ t" .f'
10/02/06
.
.
tP¿ 1/:;;-6')&6 RECEIVED
. STATE OF ALASKA . SEP 2 2 2006
ALASKA Oil AND GAS CONSERVATION COMMISSION
REPORT OF SUNDRY WELL OPERA "~9 Gas Cons. Commission
.
1. Operations Performed: -g'
Abandon~ Repair Well 0 Pluç Perforations[[) Stimulate 0 Other[2D CMT SQZ
Alter Casing 0 Pull TubingD Perforate New Pool 0 WaiverD Time ExtensionD
Change Approved ProgramD Operation ShutdownD Perforate I!] Re-enter Suspended WellD
2. Operator BP Exploration (Alaska), Inc. 4. Current Well Class: 5. Permit to Drill Number:
Name: Development 00 ExploratoryD
3. Address: P.O. Box 196612 6. API Number
Anchorage, Ak 99519-6612 StratigraphicD ServiceD 50·029-21671-00·00
7. KB Elevation (ft): 9. Well Name and Number:
72.06 G-24
8. Property Designation: 10. Field/Pool(s):
ADL-028305 Prudhoe Bay Field / Prudhoe Bay Pool
11. Present Well Condition Summary:
Total Depth measured 10475 feet
true vertical 9146.0 feet Plugs (measured) HES EZSV Retainer @ 10200 (0810312006)
Effective Depth measured 10397 feet 4-112" WFD CIBP @ 10227 (0710712006)
true vertical 9089.0 feet Junk (measured) Fish in Bottom of Well (0710712006)
Casing Length Size MD TVD Burst Collapse
CONDUCTOR 76 20" 91.5# H-40 34 - 110 34.0 · 110.0 1490 470
SURFACE 1970 13-318" 72# L·80 33 · 2003 33.0 · 2003.0 4930 2670
SURFACE 689 13·318" 72# S·95 2003 · 2692 2003.0 - 2692.0 7210 4990
PRODUCTION 9463 9·518" 47# L·80 32 - 9495 32.0 · 8394.0 6870 4760
LINER 1266 7" 26# L-80 9209 · 10475 8169.0 · 9147.0 7240 5410
Perforation depth: ~CANNED SEP 2 '{ 2005
Measured depth: All perfs are below CIBP & Cement Retainerl Cement
True vertical depth:
Tubinç ( size, çrade, and measured depth): 4-112"12.6# L-80 @ 30 - 10282
Packers & SSSV (type & measured depth): 9·518" TIW HBBP-R Packer @ 9124
7" TIW HBBP Perm Packer @ 10265
12. Stimulation or cement squeeze summary:
Intervals treated (measured): RBDMS 8Ft SEP 2 6 2006
Treatment descriptions including volumes used and final pressure:
13 ReDresentative Dailv Averaae Production or Iniection Data
Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure
Prior to well operation: SI 0 0 ... ._-
Subsequent to operation: SI 0 0 ..- --
14. Attachments: 15. Well Class after proposed work:
Exploratory(] DevelopmentOO ServiceD
Copies of Logs and Surveys run _ 16. Well Status after proposed work:
Daily Report of Well Operations_ ~ OilÅ’I GasD WAG 0 GINJD WINJD WDSPLD
Prepared by DeWayne R. Schnorr (907) 564-5174
17. I hereby certify that the foregoing is true and correct to the best of my knowledge. ¡Sundry Number or NIA if C.O. Exempt:
Contact DeWayne R. Schnorr NIA
Printed Name DeWayne R. Schnorr Title Petroleum Engineer
Signature ~~-- ,~J,¿ .... Phone 564-5174 Date 9/20/06
Form 10-404 Revised 4/2004 UK \ b \ \\J J-\ L
.
.
G-24
DESCRIPTION OF WORK COMPLETED
NRWO OPERATIONS
EVENT SUMMARY
08/09/2006 LOG SCMT TO FIND TOP OF CEMENT IN 4.S x 7" ANNULUS. TOP OF CEMENT AT 9618'.
OBJECTIVE FOR WHIPSTOCK SETTING WAS TO HAVE A TOC ABOVE 10160'. SET
BAKER 4.S" MONOBORE WHIPSTOCK AT 10180' CORRELATED TO SLB CNT-D LOG
DATED 01-MAY-1998. WHIPSTOCK SET AT O.S DEG TO THE LEFT OF HIGH SIDE AFTER
ORIENTING WITH WPPT. 2 PIP TAGS INSTALLED IN WHIPSTOCK 8.6' FROM THE
WHIPSTOCK FACE. ***JOB COMPLETE****
08/08/2006 RUN CEMENT BOND LOG WITH SCMT IN 4.S", 12.6# TUBING TO DETERMINE TOP OF
CEMENT. TOP OF CEMENT FOUND AT 9618'. 100% FREE PIPE AT 9442'. RIH WITH 4.S"
MONOBORE WHIPSTOCK.
08/06/2006 T/I/O = S40/0Nac MIT IA to 3000 psi (PASSED 3rd attempt) (CTD Screening) Pumped 10.7
bbls of Diesel down IA to reach test pressure. MIT IA lost 120 psi in the 1st 1S min and 20 psi
in the 2nd 1S min for a total loss of 140 psi in the 30 min test. Bled Tubing and lAP down to 0
psi. Final WHP's = 0/0/0
08/0S/2006 ** WELL SHUT IN UPON ARRIVAL ** {pre ctd} DRIFTED W/ 3.70" x 20' DMY WHIPSTOCK
TO 10197' SLM (HARD BTM, TARGET 10180' ELMD) *******NOTE:--- FOUND TIGHT
SPOTS @ 2834' SLM- 2843' SLM, 3422' SLM- 3436' SLM, (WORK SPOTS UNTIL TOOLS
FALL FREEL Y)******* ** TURNED WELL OVER TO PAD OP, LEFT SHUT IN**
08/03/2006 CTU#6, P&A; OOH w/ 3.7" drift. RIH w/ 4.S" HALCO EZSV. At flag correct Mid-element EZSV
@ 10193' corrected. Drop down to 1020S'. Pull into position at 10200'. Drop 1/2" ball. Pump
down did not seat. Drop 2nd ball. Drop 3rd and set EZSV at 10200' md. Set down 4000 Ibs on
Plug. Circulate gas from well bore while POOH. Recovered 1 ball on seat and 2 balls in ball
launch. MU and RIH with HES stinger assy. Circulate KCL from just above retainer to ensure
well is fluid packed. Stab into retainer and establish injection at 2.0 bpm. Pumped 3S.6 bbls
total cement. At 24 bbls away (approx. voidage behind straddle) CTP began to increase
significantly. Squeezed additional 8.S bbls cement below retainer reaching a max squeeze
pressure of approx. 3000 psi. WHP started to climb. Saw no pressure response on IA.
Equalized and un-stung from retainer dumping 3+ bbls cement on top. PUH to safe. Monitored
WHP for 1 hr. WHP continued to climb slowly leveling out at 1S00 psi. RBIH contaminating
cement to top of retainer at 10200' maintaining 1S00 psi WHP. Saw gas in initial returns.
POOH at 80%. Layed in SO/SO meth from 2400' to surface for freeze protection. Shut well in
trapping 1S00 psi WHP. RD CTU #6. *** Job Complete ***
08/02/2006 CTU #6, P&A; Cont' from 8/01/06 WSR... Stab back on with lubricator. SIMOPS with rig - new
night crew. RIH w/ 2.2S" DJN. Jet hard ice/hydrate from 1322' to 1S30' ctm w/ SO/SO meth/H20
and neat. Wait for full SO/SO meth/H20 transport. Continue to jet ice/ hydrate from 1S30' to
1600' ctm. No ice seen deeper than 1600' ctmd. Circulate SO/SO to 4200' then RIH dry. Tagged
CIBP at 10222' ctmd. PU @ 10219' ctmd. RBIH jetting SO/SO, tagged same, hard bottom. PUH
40' and flag pipe. Circulate gas out of well bore with 1 % KCL. POOH. RIH with SWS 1.S6" tbg
punch, 2' long at 4 spf. Correct depth at flag. RIH and confirm depth at CIBP. PUH and
position gun at top shot depth of 10208' corrected to tbg tally 2/11/91. This shoots the 10' pup
above the sliding sleeve (interval 10208' to 10210' @ 4 spf). Pump 1/2" ball while holding 300
psi WHP. Good indication gun fired. WHP dropped to zero. POOH filling coil void age with
SO/SO. PU 3.70" drift. Perform inj test vac w/ 4 bpm and hole filled. RIH w/ drift. Tag CIBP @
10224.6' corr ctmd. POOH.
Page 1
.
.
G-24
DESCRIPTION OF WORK COMPLETED
NRWO OPERATIONS
08/01/2006 CTU #6, Ice Plug, P&A, Cont. from 07-31-06 WSR... Stand by for Veco rig up. MIRU CTU #6.
Repair trolley gearbox. Perform weekly BOP test. MU BHA#1. RIH w/ checks, stinger, and
2.25" down jet nozzle. Tag Ice Plug at 425'ctm. Jet ice to 442'. Spike in whp. Nozzle plugged
off. Free nozzle. POH to check BHA. BHA ok. Pump up flat weight cell.
07/31/2006 DRIFT TUBING W/ 3.80 CENT. AND SAMPLE BAILER, UNABLE TO MAKE HOLE PAST
408' SLM, NO SAMPLE IN S.BAllER ***WELL S/I AND TURNED OVER TO DSO***
07/30/2006 TIO = 2250/480/80. Temp = SI. TBG & IA FLs (pre-CTD). TBG & IA FL both @ surface.
07/29/2006 T/I/O= 1840/430/80. Temp= SI. WHP's FL's (pre FB). Tbg, IA and OA FL's are at surface (Tbg
returns are very frothy). Integral flange and hardline rigged from IA through choke skid to a
flowback tank.
07/28/2006 T/I/0=11 00/280/190 Injectivity test (Packer squeeze) - Pump 5 bbls meth & 44 bbls 1 % KCI
water down tubing before pressuring up to 3000 psi. Bled 40 bbls water (Estimate) and
unknown quantity of gas. Freeze protected TBG w. 2.5 bbls neat meth and 5.2 bbls crude
before TBG pressured up to 3000 psi. DHD to troubleshoot tomorrow. Final
WHP's=2200/560/260
07/25/2006 T/I/0=2300/300/180 Temp=S/1 Bleed TBP & lAP. T & IA FL's ( Pre MIT-T, MITIA, LLR) TBG
FL = 9430' (7-23) IA FL= surface. Bleed TBP from 2300 psi to 240 psi into DHD upright tank in
4 hrs. IA FL is unchanged @ 9430' (144 bbls). Has integral on IA but hardline to open top tank
is rigged up on it. DHD tank has 2" fluid. FWHP=240/200/180
07/23/2006 T/I/0=2300/31 0/180 Temp=S/I TBG & IA FL (pre CTD) TBG FL= 9430' (144 bbls). IA FL is at
surface. No AIL. *** Wing valve is frosted/notified operator ***
07/20/2006 PUNCH TUBING HOLES BELOW SLIDING SLEEVE, FROM 10222' -10224', USING SMALL
CHARGES. HOLES IN PUNCHER AFTER FIRING DID NOT LINE UP WITH SCALLOPS IN
HOUSING.
07/14/2006 ***WELL SHUT IN ON ARRIVAL***(open sliding sleeve).. MADE 5 ATTEMPTS TO SHIFT
"XA" SLIDING SLEEVE W/ 42BO SHIFTING TOOL @ 10189' SLM. UNABLE TO SHIFT
SLEEVE. *** LEFT WELL SHUT IN ***
07/11/2006 T/I/O= 2150/300/280. MIT-T to 3000 psi. [PASSED on the first attempt] Lost 140 psi / 1st 15
min and 60 psi / 2nd 15 min. Pumped 43 bbls of 48* diesel to achieve test pressure. Well was
shut in upon arrival. Bleed back to gas. Final WHP=2150/380/280.
07/10/2006 T/I/O= 2250/150/190. Temp= SI. Bleed WHP's < 500 psi (pre fullbore). Bled tubing pressure to
production from 2250 psi to 180 psi in 30 minutes. During bleed lAP decreased 100 psi and
OAP decreased 40 psi. Monitored for 30 minutes. No change in pressures. Final WHP'=
180/50/150.
07/07/2006 RUN 3.65" GAUGE RING/JUNK BASKET TO 10247' BELOW THE SLIDING SLEEVE. SET
THE TOP OF THE CIBP AT 10227' WHICH IS 7' BELOW THE SLIDING SLEEVE.
***CORRELATED TO TUBING TALLY DATED 11-FEB-1991.***
Page 2
.
.
G-24
DESCRIPTION OF WORK COMPLETED
NRWO OPERATIONS
07/06/2006 ATTEMPT TO SET CIBP AT 10275.25' IN THE 4.03' PUP JOINT BELOW THE SLIDING
SLEEVE CORRELATED TO TUBING TALLY DATED 11-FEB-1991. NO INDICATION OF
GOOD SET. TOOL WILL MOVE DOWNHOLE. POOH TO BOTTOM OF BLAST JOINTS AT
10264'. TOOL BECOMES STUCK. PULL 2500# TO FREE. POOH WITH ELINE. #10
SETTING TOOL AND IGNITER IS FIRED AND PLUG SLIPS ARE LEFT IN THE HOLE.
MOST LIKELY WEDGED JUST ABOVE 10264'.
06/29/2006 T/I/0=2270/50/180 Temp=S/1 TBG (Pre EL CIBP) TBG FL=10,215' (Sliding sleeve) (155 bbls)
06/11/2006 ***WELL S/I ON ARRIVAL*** RAN 4.5" X-LINE, TIED IN WITH 4 1/2" XA SLIDING SLEEVE
@ 10200' SLM, 16' CORRECTION. RAN CIBP TO 10253' CMD, TOOL STROKED AND
FIRED ON TIME, LOWERED TOOL STRING TO CONFIRM SET, DROPPED DOWN TO
10277' CMD, DIDN'T SEE PLUG. POOH TO INVESTIGATE TOOL STRING, EVERYTHING
FUNCTIONED PROPERLY, NOTIFY PE'S. R/D***WELL LEFT S/I, DSO NOTIFIED***
FLUIDS PUMPED
BBLS
7 Diesel --- PT Surface Equipment
25 Neat
5 Methanol
698 50/50 Methanol Water
60 Diesel
5 Crude
731 1 % KCL Water
219 1 % Extra Slick KCL Water
54 Fresh Water
26 1.5# Biozan
35.6 15.8 PPQ Class "G" Cement
1865.6 TOTAL
Page 3
TREE =
WELLHEAD =
ACTUA TOR =
KB. ELEV =
BF. ELEV =
KOP=
Max Angle =
Datum MD =
DatumTVD=
4"CAMERON
McEVOY
OTIS
72.06'
35.91'
2900'
43 @ 10346'
10105'
8800' SS
, 13-318" CSG, 72#, L-80, ID = 12.347" I
Minimum ID = 3.725" @ 10278'
4-1/2" PARKER SWN NIPPLE
I TOP OF 7" LNR I
19-5/8" CSG, 47#, L-80, ID = 8.681" I
I TOP OF CEMENT I
TUBING PUNCH (08/02106) I
TUBING PUNCH (07/20/06) I 10222' -10224'
14-1/2" TBG, 12.6#, L-80, .0152 bpf, ID = 3.958" I
10282'
ÆRFORA TON SUMMARY
REF LOG: BHCS ON 12/16/86
ANGLE AT TOP ÆRF: 42 @ 10242'
Note: Refer to Production DB for historical perf data
SIZE SPF INTERVAL OPNISQZ DATE
3-3/8" 4 10242 - 10268 S 08/03/06
3-3/8" 8 10284 - 10332 C 02/06/87
3-3/8" 4 10340 - 10360 C 02/25/91
I 7" LNR, 26#, L-80, .0383 bpf, 10 = 6.276" I
I PBTDI
DATE
12106/87
02113191
10/08/05
11/05/05
06/11/06
06/11/06
REV BY COMMENTS
ORIGINAL COM PLETION
RIG WORKOVER
JA<lTLH GLV CORRECTION
???/TLH CSG CORRECTIONS
KSB/PJC FISH (4-1/2" HES EZ DRILL)
KSB/PJC SAFETY NOTE
10397'
10475'
G-24
SAFETY NOTES: "'UNCONFIRMED PROBLEM -TAILPlÆ
APPEARS TO HAVE FALLEN OFF BETWEEN PKR & X
NIPPLE (06/11/06)'"
.
2110' -14-112" SSSV OTIS LNDNG NIP, 10 = 3.813"
ST MD
5 2983
4 4986
3 6981
2 8817
1 9087
9116'
9124'
GAS LIFT MANDRELS
TVD DEV TYÆ VLV LATCH PORT DATE
2911 5 MERLA DMY RA 0 04103/94
4685 35 MERLA DMY RA 0 04/03/94
6288 35 MERLA DMY RA 0 04/03194
7791 38 MERLA DMY RA 0 04103/94
8002 39 MERLA DMY RA 0 04103/94
-14-1/2" PARKER SWS NIP, ID = 3.813"
9-5/8" x 4-1/2" TIW HBBP-R RET
PKR WILA TCH, 10 = 4.00"
-17" MARKER JOINT I
-i 4-1/2" BKR MONOBORE WS (08/09/06)
-i HES EZSV RETAINER (08/03/06) I
-14-1/2" OTIS XA SLIDING SLY. ID = 3.813"
-14-1/2" WFD CIBP (07/07106) I
--i TOP OF BLAST JOINTS I
-1 BTM OF BLAST JOINTS I
-17" x 4-1/2" TIW HBBP ÆRM PKR, 10 = 3.875"
10273' -14-1/2" PARKER SWS NIP, ID = 3.813"
10278' -14-1/2" PARKER SWN NIP, ID = 3.725"
10282' -14-1/2" TTL WLEG I
10288' H ELMD TT LOGGED 02/25/91
FISH - 4_1/2" WFD CIBPN SLIPS &
ELEMENT ONLY (07/07/06)
FISH - 4-1/2" HES EZ DRILL
25" X 3.66 OD (06/11/06)
FISH - BOW SPRING (02/11/93)
25" X 0.05" X 0.1875"
DA TE BY COMMENTS
07/07/06 RRDlPAG SET WFD CIBP, FISH LEFT
07/20/06 DFRlPJC TUBING PUNCH
08102/06 SRB/PJC TUBING PUNCH
08/03/06 SRB/PJC SET HES-EZSV RETAINER
08109/06 RRD/PJC SET WS & TOP OF CEMENT
PRUDHOE BA Y UNfT
WELL: G-24
ÆRMrTNo: 186-1830
API No: 50-029-21671-00
SEC 12, T11N, R13E
BP Exploration (Alaska)
10-407 for G-24, PTD #186-183
.
.,
Hi Bob,
You were right, of course. The Range for the TPI and TD are both supposed to be R14E.
have corrected our copies. Thanks for bringing it to my attention.
Terrie
5(;ANNED SEP 2 0 200B
1 of 1
9/20/2006 6:53 AM
RfC- 11J~/<5 6
. STATE OF ALASKA . RECEIVED
ALASKA OIL AND GAS CONSERVATION COM. SION
WELL COMPLETION OR RECOMPLETION REPORT AND LO~ E P 1 4 Z006
Alaska Oil & Gas Cons. COfM1ission
1a. Well Status: DOil DGas D Plugged ~ Abandoned D Suspended DWAG 1 b. Well CAaånrage
20AAC 25.105 20AAC 25.110 ~ Development D Exploratory
DGINJ DWINJ D WDSPL No. of Completions Zero Other D Stratigraphic D Service
2. Operator Name: 5. Date Comp., Susp., or Aband. 12. Permit to Drill Number
BP Exploration (Alaska) Inc. 8/3/2006 186-183 306-176
3. Address: 6. Date Spudded 13. API Number
P.O. Box 196612, Anchorage, Alaska 99519-6612 12/06/1986 50-029-21671-00-00
4a. Location of Well (Governmental Section): 7. Date 1.0. Reached 14. Well Name and Number:
Surface: 12/16/1986 PBU G-24
2703' FNL, 1974' FEL, SEC. 12, T11N, R13E, UM 8. KB Elevation (ft): 15. Field 1 Pool(s):
Top of Productive Horizon: ~ ~~ f¡ 9/ok
354' FNL, 28' FWL, SEC. 18, T11N, ,UM 11 72.1' Prudhoe Bay Field 1 Prudhoe Bay
Total Depth: ~E tFb 9. Plug Back Depth (MD+ TVD) Pool
868' FNL, 170' FWL, SEC. 18, T11N, E, UM 10397 + 9090 Ft
4b. Location of Well (State Base Plane Coordinates): 10. Total Depth (MD+TVD) 16. Property Designation:
Surface: x- 658255 y- 5968946 Zone- ASP4 10475 + 9147 Ft ADL 028305
TPI: x- 660319 y- 5966058 Zone- ASP4 11. Depth where SSSV set 17. Land Use Permit:
Total Depth: x- 660472 y- 5965547 Zone- ASP4 None MD
DYes ~No 19. Water depth, if offshore 20. Thickness of Permafrost
18. Directional Survey N/A MSL 1900' (Approx.)
21. Logs Run:
OIL 1 SFL, BHCS, CNL 1 GR-Poro
22. CASING, LINER AND CEMENTING RECORD
CASING SETI"INGDEPTHMD SETTING OEPTHtvD HOLE ". .... r\IYIVIJ....1... ....
SizE \AfrPCDI='" GRADE BOTTOM BOTTOM SIZE .'~ ......... ....... \ PULLED
Top Top
20" Surface 110' Surface 110' 9 cu vds Concrete
13-3/8" 72# L-80 Surface 2693' Surface 2693' 17-1/2" 3258 cu ft PF 'E' 465 cu ft PF
9-5/8" 47# L-80 Surface 9495' Surface 8394' 12-1/4" 575 cu ft Class 'G'
7" 26# L-80 9209' 1 0473' 8169' 9146' 8-1/2" 383 cu ft Class 'G'
23. Perforations open to Production (MD + TVD of Top and 24. TUBING REcORd . > ......... .\ ....
..
Bottom Interval, Size and Number; if none, state "none"): SIZE DEPTH SET (MD) PACKER SET (MD)
None 4-1/2", 12.6#, L-80 10282' 9124' & 10265'
MD TVD MD TVD
ACID. r-_ .. ETC..···· ..... ....
25. . ..... ...... ........ ....
DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED
10227' Set CIBP
10200' Set EZSV
10200' P&A with 35.6 Bbls Class 'G'
10180' Set Whipstock
26. PRODUCTION TEST
Date First Production: Method of Operation (Flowing, Gas Lift, etc.):
Not on Production N/A
Date of Test Hours Tested PRODUCTION FOR Oll-BBl GAs-McF WATER-BBl CHOKE SIZE I GAS-Oil RATIO
TEST PERIOD ~
Flow Tubing Casing Pressure CALCULATED Oil -BBl GAs-McF WATER-BBl Oil GRAVITY-API (CORR)
Press. 24-HoUR RATE+
27. CORE DATA
Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water (attach separate sheet, if necessary).
Submit core chips; if none, state "none". RBDMS 8Ft SEP j 9 2006
None
Form 10-407 Revised 12/2~ R , G. , N AL CONTINUED ON REVERSE SIDE
U ì \' .\
c
28.
GEOLOGIC MARKER
29.
RMATION TESTS
NAME
MD
TVD
Include and briefly summarize test results. List intervals tested,
and attach detailed supporting data as necessary. If no tests
were conducted, state "None".
Sag River
9509'
8405'
None
Shublik A
9554'
8441'
Sadlerochit 1 Zone 4
9647'
8514'
30. List of Attachments: Summary of Pre-Rig Work and Daily Drilling Reports, Well Schematic Diagram
Signed Terrie Hubbl
Title
Technical Assistant
Date
09( l3Ä
PBU G-24
Well Number
186-183 306-176
Permit NO.1 A roval No.
Prepared By Name/Number:
Drilling Engineer:
Terrie Hubble, 564-4628
Sean McLaughlin, 564-4387
INSTRUCTIONS
GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in
Alaska.
ITEM 1 a: Classification of Service Wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water
Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with
production from each pool completely segregated. Each segregated pool is a completion.
ITEM 4b: TPI (Top of Producing Interval).
ITEM 8: The Kelly Bushing elevation in feet above mean low low water. Use same as reference for depth measurements given in
other spaces on this form and in any attachments.
ITEM 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00).
ITEM 20: True vertical thickness.
ITEM 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the
cementing tool.
ITEM 23: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in
item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional
interval to be separately produced, showing the data pertinent to such interval).
ITEM 26: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, or
Other (explain).
ITEM 27: If no cores taken, indicate "None".
ITEM 29: List all test information. If none, state "None".
Form 10-407 Revised 12/2003
Submit Original Only
Dig~tal Wellfile .
Well Events for SurfaceWell - G-24
Location: BP -> ALASKA -> GREATER PRUDHOE BAY -> GC1 -> G -> G-24
Date Range: llfJun/2006 to 16/Aug/2006
Data Source(s): DIMS, AWGRS
Events
Source Well Date
AWGRS G-24 08/16/2006
AWGRS G-24 08/16/2006
AWGRS G-24 08/15/2006
AWGRS G-24 08/09/2006
AWGRS G-24 08/08/2006
AWGRS G-24 08/06/2006
AWGRS G-24 08/05/2006
AWGRS G-24 08/03/2006
AWGRS G-24 08/02/2006
.
Page 1 of 2
Description
T/I/0=170/6/VAC. Flowline=170 psi. Temp=SI. Bleed WHPs to 0 psi. (Pre-PPPOT, pre CTD). T
FL near surface. Bled TP from 170 psi to 0+ psi in 1 hr, returns all gas. SI master valve,
monitored for 30 min. TP increased to 40 psi, BUR appears to be coming thru the wing valve. SI
lateral valve, opened wing valve and bled TP and S-riser to 0 psi in 15 mins. Grease crew
serviced tree valves. SI wing valve and monitored TP, increased to 0+ psi in 2 hrs. Assisted
wellhead tech w/ PPPOT. Final WHPs = O+/O+/VAC. S-riser = 10 psi.
T/IA/OA = SI/O/O (Pre-Rig Workover Inspection) PPPOT-IC = PASSED PPPOT-T = PASSED Bled
inner casing hanger packoff void to 0 psi. OHD, Cody McCollum assist open bled during testing.
Functioned/Torqued Lockdown Screws to 450 ft/lbs. Rigged up test equipment, pump thru void
until clean returns were achieved. Tested packoff to 3,800 psi. for 30 mins. - Passed Bled
tubing hanger void to 0 psi. Functioned/Torqued Locdown Screws to 450 ft/lbs. Rigged up test
equipment, and pumped thru void until clean returns were achieved. Tested tubing hanger to
5,000 psi. for 30 mins. - Passed.
T/I/0=760/80/VAC. Temp=SI. Bleed WHPs to 0 psi. (Pre PPPOT). T FL @ 2410' below SSSV.
Bled TP from 760 psi to 160 psi in 15 min down G-24 flow line. Flowline was not freeze
protected prior to bleed. Continued bleeding WHPs to slop trailer. Bled TP from 160 psi to 20 psi
in 4.5 hrs, returns gas/fluid mix fluids came to surface 1.5 hrs into bleed. SI master valve and
TP bled off to dead zero in 30 sec. Waited 10 min, opened master valve and TP increased to 80
psi. SI TP bleed, start lAP bleed. Bled lAP from 80 psi to 0 psi in 30 min returns all fluid. TP
increased to 200 psi in 30 min. Resumed TP bleed, bled TP from 200 psi to 0+ psi in 1.5 hrs.
lAP went to VAC. Monitored for 30 min, TP increased to 40 psi. Final WHPs = 40/VAC/VAC.
CONTINUED FROM 8/8/2006 LOG SCMT TO FIND TOP OF CEMENT IN 4.5 x 7" ANNULUS. TOP
OF CEMENT AT 9618'. OBJECTIVE FOR WHIPSTOCK SETTING WAS TO HAVE A TOC ABOVE
10160'. SET BAKER 4.5" MONOBORE WHIPSTOCK AT 10180' CORRELATED TO SLB CNT-D LOG
DATED 01-MAY-1998. WHIPSTOCK SET AT 0.5 DEG TO THE LEFT OF HIGH SIDE AFTER
ORIENTING WITH WPPT. 2 PIP TAGS INSTALLED IN WHIPSTOCK 8.6' FROM THE WHIPSTOCK
FACE. ***JOB COMPLETE****
RUN CEMENT BOND LOG WITH SCMT IN 4.5", 12.6# TUBING TO DETERMINE TOP OF CEMENT.
TOP OF CEMENT FOUND AT 9618'. 100% FREE PIPE AT 9442'. RIH WITH 4.5" MONOBORE
WHIPSTOCK. ***** WSR CONTINUED ON 8/9/2006. *****
T/I/O = 540/0/Vac MIT IA to 3000 psi (PASSED 3rd attempt) (CTD Screening) Pumped 10.7
bbls of Diesel down IA to reach test pressure. MIT IA lost 120 psi in the 1st 15 min and 20 psi
in the 2nd 15 min for a total loss of 140 psi in the 30 min test. Bled Tubing and lAP down to 0
psi. Final WHP's = 0/0/0
** WELL SHUT IN UPON ARRIVAL ** {pre ctd} DRIFTED W/ 3.70" x 20' DMY WHIPSTOCK TO
10197' SLM (HARD BTM, TARGET 10180' ELMO) *******NOTE:--- FOUND TIGHT SPOTS @
2834' SLM- 2843' SLM, 3422' SLM- 3436' SLM, (WORK SPOTS UNTIL TOOLS FALL FREELY)
******* ** TURNED WELL OVER TO PAD OP, LEFT SHUT IN**
CTU#6, PM; Continued from 8/2/2006 WSR ... OOH w/ 3.7" drift. RIH w/ 4.5" HALCO EZSV. At
flag correct Mid-element EZSV @ 10193' corrected. Drop down to 10205'. Pull into position at
10200'. Drop 1/2" ball. Pump down did not seat. Drop 2nd ball. Drop 3rd and set EZSV at
10200' md. Set down 4000 Ibs on Plug. Circulate gas from wellbore while POOH. Recovered 1
ball on seat and 2 balls in ball launch. MU and RIH with HES stinger assy. Circulate KCL from
just above retainer to ensure well is fluid packed. Stab into retainer and establish injection at
2.0 bpm. Pumped 35.6 bbls total cement. At 24 bbls away (approx. voidage behind straddle)
CTP began to increase significantly. Squeezed additional 8.5 bbls cement below retainer
reaching a max squeeze pressure of approx. 3000 psi. WHP started to climb. Saw no pressure
response on IA. Equalized and un-stung from retainer dumping 3+ bbls cement on top. PUH to
safe. Monitored WHP for 1 hr. WHP continued to climb slowly leveling out at 1500 psi. RBIH
contaminating cement to top of retainer at 10200' maintaining 1500 psi WHP. Saw gas in initial
returns. POOH at 80%. Layed in 50/50 meth from 2400' to surface for freeze protection. Shut
well in trapping 1500 psi WHP. RD CTU #6. *** Job Complete ***
CTU #6, PM; Co nt' from 8/01/06 WSR ... Stab back on with lubricator. SIMOPS with rig - new
night crew. RIH w/ 2.25" DJN. Jet hard ice/hydrate from 1322' to 1530' ctm w/ 50/50
meth/H20 and neat. Wait for full 50/50 meth/H20 transport. Continue to jet ice/ hydrate from
1530' to 1600' ctm. No ice seen deeper than 1600' ctmd. Circulate 50/50 to 4200' then RIH
dry. Tagged CIBP at 10222' ctmd. PU @ 10219' ctmd. RBIH jetting 50/50, tagged same, hard
bottom. PUH 40' and flag pipe. Circulate gas out of wellbore with 1% KCL. POOH. RIH with SWS
1.56" tbg punch, 2' long at 4 spf. Correct depth at flag. RIH and confirm depth at CIBP. PUH
http://digitalwellfile.bpweb.bp.comIW ellEvents/Home/Default.aspx
9/13/2006
Digital Wellfile
AWGRS G-24 08/01/2006
AWGRS G-24 07/31/2006
8WGRS G-24 07/31/2006
AWGRS G-24 07/30/2006
AWGRS G-24 07/30/2006
8Y\lGRS G-24 07/29/2006
AWGRS G-24 07/28/2006
AWGRS G-24 07/26/2006
AWGRS G-24 07/25/2006
AWGRS G-24 07/23/2006
AWGRS G-24 07/20/2006
AWGRS G-24 07/14/2006
AWGRS G-24 07/11/2006
AWGRS G-24 07/11/2006
AWGRS G-24 07/10/2006
AWGRs G-24 07/07/2006
AWGRs G-24 07/06/2006
AWGRS G-24 06/29/2006
8Y\lGRS G-24 06/11/2006
. Page 2of2
and position gun at top shot depth of 10208' corrected.g tally 2/11/91. This shoots the 10'
pup above the sliding sleeve (interval 10208' to 10210' @ 4 spf). Pump 1/2" ball while holding
300 psi WHP. Good indication gun fired. WHP dropped to zero. POOH filling coil voidage with
50/50. PU 3.70" drift. Perform inj test vac w/ 4 bpm and hole filled. RIH w/ drift. Tag CIBP @
10224.6' carr ctmd. POOH. Continued on 8/03/2006 WSR ...
CTU #6, Ice Plug, PM, Cont. from 07-31-06 WSR... Stand by for Veco rig up. MIRU CTU #6.
Repair trolley gearbox. Perform weekly BOP test. MU BHA#1. RIH w/ checks, stinger, and 2.25"
down jet nozzle. Tag Ice Plug at 425'ctm. Jet ice to 442'. Spike in whp. Nozzle plugged off. Free
nozzle. POH to check BHA. BHA ok. Pump up flat weight cell. Job Continued on 8-02-06 WSR ...
CTU #6, ICE PLUG, PM; ROAD UNIT TO G-24. Cant" on 08-01-06 WSR ...
***JOB CONT. FROM 7/30/06*** DRIFT TUBING W/ 3.80 CENT. AND SAMPLE BAILER, UNABLE
TO MAKE HOLE PAST 408' SLM, NO SAMPLE IN S.BAILER ***WELL S/I AND TURNED OVER TO
DSO***
***WELL S/I ON ARRIV.*** RIG UP SLICKLINE ***JOB CO NT. ON 7/31/06***
TIO = 2250/480/80. Temp = SI. TBG & IA FLs (pre-CTD). TBG & IA FL both @ surface.
T/I/O= 1840/430/80. Temp= SI. WHP's FL's (pre FB). Tbg, IA and OA FL's are at surface (Tbg
returns are very frothy). Integral flange and hardline rigged from IA through choke skid to a
flow back tank.
T/I/0=1100/280/190 Injectivity test (Packer squeeze) - Pump 5 bbls meth & 44 bbls 1% KCI
water down tubing before pressuring up to 3000 psi. Bled 40 bbls water (Estimate) and
unknown quantity of gas. Freeze protected TBG w. 2.5 bbls neat meth and 5.2 bbls crude
before TBG pressured up to 3000 psi. DHO to troubleshoot tomorrow. Final
WHP's=2200/560/260
T/I/0=1350/350/240 LLR Packer (CTD Screening, sqz packer leak) Too much TBG psi to do job
postponed till DHD can bleed TBG Final whp's=1550/350/240
T/I/O=2300/300/180 Temp=S/1 Bleed TBP & lAP. T & IA FL's ( Pre MIT-T, MITIA, LLR) TBG FL
= 9430' (7-23) IA FL= surface. Bleed TBP from 2300 psi to 240 psi into OHD upright tank in 4
hrs. IA FL is unchanged @ 9430' (144 bbls). Has integral on IA but hardline to open top tank is
rigged up on it. DHD tank has 2" fluid. FWHP=240/200/180
T/I/0=2300/310/180 Temp=S/1 TBG & IA FL (pre CTD) TBG FL= 9430' (144 bbls). IA FL is at
surface. No A/L. *** Wing valve is frosted/notified operator ***
PUNCH TUBING HOLES BELOW SLIDING SLEEVE, FROM 10222' - 10224', USING SMALL
CHARGES. HOLES IN PUNCHER AFTER FIRING DID NOT LINE UP WITH SCALLOPS IN HOUSING.
***WELL SHUT IN ON ARRIVAL ***(open sliding sleeve).. MADE 5 ATTEMPTS TO SHIFT "XA"
SLIDING SLEEVE W/ 42BO SHIFTING TOOL @ 10189' SLM. UNABLE TO SHIFT SLEEVE. ***
LEFT WELL SHUT IN ***
T/I/O= 2150/300/280. MIT-T to 3000 psi. [PASSED on the first attempt] Lost 140 psi / 1st 15
min and 60 psi / 2nd 15 min. Pumped 43 bbls of 48* diesel to achieve test pressure. Well was
shut in upon arrival. Bleed back to gas. Final WHP=2150/380/280.
T/I/O = 2310/370/260. Temp = SI. WHPs post-bleed (pre-inj test). Tubing pressure increased
2130 psi, lAP increased 320 psi, OAP increased 110 psi, all overnight.
T/I/O= 2250/150/190. Temp= SI. Bleed WHP's < 500 psi (pre fullbore). Bled tubing pressure to
production from 2250 psi to 180 psi in 30 minutes. During bleed lAP decreased 100 psi and
OAP decreased 40 psi. Monitored for 30 minutes. No change in pressures. Final WHP'=
180/50/150.
RUN 3.65" GAUGE RINGjJUNK BASKET TO 10247' BELOW THE SLIDING SLEEVE. SET THE TOP
OF THE CIBP AT 10227' WHICH IS 7' BELOW THE SLIDING SLEEVE. ***CORRELATEO TO
TUBING TALLY DATED 11-FEB-1991.***
ATTEMPT TO SET CIBP AT 10275.25' IN THE 4.03' PUP JOINT BELOW THE SLIDING SLEEVE
CORRELATED TO TUBING TALLY DATED 11-FEB-1991. NO INDICATION OF GOOD SET. TOOL
WILL MOVE DOWNHOLE. POOH TO BOTTOM OF BLAST JOINTS AT 10264'. TOOL BECOMES
STUCK. PULL 2500# TO FREE. POOH WITH ELINE. #10 SETTING TOOL AND IGNITER IS FIRED
AND PLUG SLIPS ARE LEFT IN THE HOLE. MOST LIKELY WEDGED JUST ABOVE 10264'.
**********JOB CONTINUED ON 07-07-06*********
T/I/0=2270/50/180 Temp=S/1 TBG (Pre EL CIBP) TBG FL=10,215' (Sliding sleeve) (155 bbls)
***WELL S/I ON ARRIVAL *** RAN 4.5" X-LINE, TIED IN WITH 4 1/2" XA SLIDING SLEEVE @
10200' SLM, 16' CORRECTION. RAN CIBP TO 10253' CMD, TOOL STROKED AND FIRED ON
TIME, LOWERED TOOL STRING TO CONFIRM SET, DROPPED DOWN TO 10277' CMD, DIDN'T
SEE PLUG. POOH TO INVESTIGATE TOOL STRING, EVERYTHING FUNCTIONED PROPERLY,
NOTIFY PE'S. RjO***WELL LEFT S/I, DSO NOTIFIED***
http://digitalwellfile.bpweb.bp.com/W ellEvents/Home/Default.aspx
9/13/2006
TREE =
.lNELLHEA.P =
ACTUA TOR =
KB. ELEV =
BF. ELEV =
KOP=
Max Angle =
Datum MD =
Datum 1VD =
4"CAMERON
McEVOY
OTIS
72.06'
35.91'
2900'
43 @ 10346'
10105'
8800' SS
113-3/8" CSG, 72#, L-80, 10 = 12.347"
.
Minimum ID = 3.725" @ 10278'
4-1/2" PARKER SWN NIPPLE
TOPOF 7" LNR I
9-5/8" CSG, 47#, L-80, 10 = 8.681" I
I TOP OF CEMENT I
1 TUBING PUNCH (08/02/06) I
1 TUBING PUNCH (07/20/06) I 10222' - 10224'
14-1/2" TBG, 12.6#, L-80, .0152 bpf, 10 = 3.958" I
10282'
ÆRFORA TION SUMMARY
REF LOG: BHCS ON 12/16/86
ANGLEAT TOP ÆRF: 42 @ 10242'
Note: Refer to Production DB for historical perf data
SIZE SPF INTERVAL OPNISQZ DATE
3-3/8" 4 10242 - 10268 S 08/03/06
3-3/8" 8 10284 - 10332 C 02/06/87
3-3/8" 4 10340 - 10360 C 02/25/91
1 PBTDI
17" LNR, 26#, L-80, .0383 bpf, 10 = 6.276" I
DATE
12/06/87
02/13/91
10/08/05
11/05/05
06/11/06
06/11/06
REV BY COMMENTS
ORIGINAL COM PLETION
RIG WORKOVER
JPKlTLH GL V CORRECTION
???/TLH CSG CORRECTIONS
KSB/PJC FISH (4-1/2" HES EZ DRILL)
KSB/PJC SAFETY NOTE
10397'
10475'
DATE
07/07/06
07/20/06
08/02/06
08/03/06
08/09/06
G-24
SAF~TES: "'UNCONFIRMED PROBLEM - TA ILPlÆ
APÆWrO HAVE FALLEN OFF BETWEEN PKR & X
NIPPLE (06/11/06)*"
.
2110' "4-1/2" SSSV OTIS LNDNG NIP, 10 3.813" I
GAS LIFT MANDRELS
1VO DEV lYÆ VLV LATCH PORT DATE
2911 5 MERLA DMY RA 0 04/03/94
4685 35 MERLA DMY RA 0 04/03/94
6288 35 MERLA DMY RA 0 04/03/94
7791 38 MERLA DMY RA 0 04/03/94
8002 39 MERLA DMY RA 0 04/03/94
"4-1/2" PARKERSWS NIP, 10 - 3.813"
9-5/8" x 4-1/2" TIIN HBBP-R RET
PKR W/LA TCH, 10 = 4.00"
-17" MARKER JOINT I
"4-1/2" BKR MONOBOREWS (08/09/06)
H HES EZSV RETAINER (08/03/06) I
10216' "4-1/2" OTIS XA SLIDING SLV, 10 - 3.813"
10227' -14-1/2" WFD CIBP (07/07/06) I
.,TOPOF BLAST JOINTS I
., BTM OF BLAST JOINTS I
., 7" x 4-1/2" TIIN HBBP ÆRM PKR, 10 - 3.875"
ST MD
5 2983
4 4986
3 6981
2 8817
1 9087
9116'
9124'
10273' "4-1/2" PARKERSWS NIP, 10 - 3.813"
10278' "4-1/2" PARKER SWN NIP, 10 - 3.725"
10282' "4-1/2" TTL WLEG I
10288' H ELMO TT LOGGED 02/25/91
FISH - 4-1/2" WFD CIBPN SLIPS &
ELEMENT ONLY (07/07/06)
FISH - 4-1/2" HES EZ DRILL
25" X 3.66 00 (06/11/06)
FISH - BOW SPRING (02/11/93)
25" X 0.05" X 0.1875"
EV BY COMMENTS
RRD/PAG SET WFD CIBP, FISH LEFT
OFRlPJC TUBING PUNCH
SRB/PJC TUBING PUNCH
SRB/PJC SET HES-EZSV RETAINER
RRD/PJC SET WS & TOP OF CEMENT
PRUDHOE BA Y UNrT
WELL: G-24
ÆRMrT No: 186-1830
API No: 50-029-21671-00
SEC 12, T11N, R13E
BP Exploration (Alaska)
RECEIVED
Scblum~erger
í '. i..;\ (..)
t! ,:. (c<
AUG 2 :3 2006
NO. 3914
Alaska Data & Consulting Services
2525 Gambell Street, Suite 400
Anchorage, AK 99503-2838
ATTN: Beth
':'J.a$à Oil & Gas Cons. Ccmmissiçn
AnCf1crag-e
Company: State of Alaska
Alaska Oil & Gas Cons Comm
Attn: Christine Mahnken
333 West 7th Ave, Suite 100
Anchorage. AK 99501
l~b--/1J>
Field: Prudhoe Bay
Well Job# Loa DescriDtion Date BL Color CD
6-15 11221600 ILDL uö/02l0ö 1
F-22 11194169 ILDL 02/17/06 1
P-14 11212851 LDL 04/28/06 1
F-24· N/A PRODUCTION LOG 03/29/06 1
E-10A· 11047361 SENSA/MEMORY LDL 10/19/05 1
H-30· 11223103 LDL 03/19/06 1
A-37 11225946 PROD PROFILE W/DEFT 03/20/06 1
B-12A 11211386 PROD PROFILE W/DEFT & GHOST 03/31/06 1
G-06A 11258691 LDL 04/06/06 1
G-24 11258689 LDL 03/21/06 1
H-30 11217258 US IT 06/09/06 1
A-30A 40010566 OH EDIT OF MWD/LWD 06/26/04 2 1
A-30A PB1 40010566 OH EDIT OF MWD/LWD 06/21/06 2 1
A-30A PB2 40010566 OH EDIT OF MWD/LWD 06/25/06 2 1
Petrotechnical Data Center LR2-1
900 E. Benson Blvd.
Anchorage, Alaska 99508
Alaska Data & Consulting Services
2525 Gambell Street, Suite 400
Anchorage, AK 99503-2838
A TIN: Beth
08/15/06
.
.
e
e
FRANK H. MURKOWSKI, GOVERNOR
AI1ASIiA. OILAlO) GAS
CONSERVATION COMMISSION
333 W. 7'" AVENUE. SUITE 100
ANCHORAGE, ALASKA 99501-3539
PHONE (907) 279-1433
FAX (907) 276-7542
Sean McLaughlin
CT Drilling Engineer
BP Exploration (Alaska) Inc.
PO Box 196612
Anchorage, AK 99519-6612
~'t3
\ {{¡ to'
Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, PBU G-24
Sundry Number: 306-176
Dear Mr. McLaughlin:
"'11"".... r ~"~~í,:::k~!
~,~~\ì;'iiì,l..f
..L r
Enclosed is the approved Application for Sundry Approval relating to the
above referenced well. Please note the conditions of approval set out in the
enclosed form.
When providing notice for a representative of the Commission to witness any
required test, contact the Commission's petroleum field inspector at (907)
659-3607 (pager).
As provided in AS 31.05.080, within 20 days after written notice of this
decision, or such further time as the Commission grants for good cause
shown, a person affected by it may file with the Commission an application
for rehearing. A request for rehearing is considered timely if it is received by
4:30 PM on the 23rd day following the date of this letter, or the next working
day if the 23rd day falls on a holiday or weekend. A person may not appeal
a Commission decision to Superior Court unless rehearing has been
requested.
Sincerely,
DATED this Ibday of May, 2006
Encl.
<)
~
~\I ,
(j\\ , s1'-o(, ¡fpe:. 5.6&
'" ,¡ ALASKA Oil AND ~:;~g~:~~~~ON COMMISSION M W 1 5
~ APPLICATION FOR SUNDRY APPROVAL
~ 20 MC 25.280
\J.J ~ IT- ? Iffi' ( Lf) '" '-4'
,-,
1. Type of Request: 1m Abandon I o Repair Well o Plug Perforations o Stimulate o Other
o Alter Casing o Pull Tubing o Perforate New Pool o Waiver o Re-Enter Suspended W
o Change Approved Program o Operation Shutdown o Perforate o Time Extension
2. Operator Name: 4. Well Class Before Work: / 5. Permit To Drill Number
BP Exploration (Alaska) Inc. ~ Development D Exploratory 186-183 /'
3. Address: D Stratigraphic D Service 6. API Number: /"
P.O. Box 196612, Anchorage, Alaska 99519-6612 50-029-21671-00-00
7. KB Elevation (ft): 72.1' 9. Well Name and Number:
PBU G-24 /'
8. Property Designation: 10. Field / Pool(s):
ADL 028305 Prudhoe Bay Field / Prudhoe Bay Pool
,1T x ..../. /'.."'.'/'/;0".(.. é' '" .........;!.;!.,;.,....,......... .'...,.
Total Depth MD (ft): Total Depth TVD (ft): Effective Depth MD (ft): Effective Depth TVD (ft) Plugs (measured): Junk (measured):
10475 9147 10397 / 9090 None 10323
Casing Length Size MD f TVD Burst Collapse
Structural
Conductor 110' 20" 110' 110'
Surf;:¡ce 2693' 13-3/8" 2693' 2693' 4930 2670
Intermediate 9495' 9-5/8" 9495' 8394' 6870 4760
Production
Liner 1264' 7" 9209' - 10473' 8169' - 9146' 7240 5410
Perforation Depth MD:Y: I Perforation Depth TVD (ft): I Tubing Size: Tubing Grade: Tubing MD (ft):
10242' - 10360' 8975' - 9062' 4-1/2", 12;6# L-80 10282'
Packers and SSSV Type: 9-5/8" x 4-1/2" TIW 'HBBP-4" Ret Packer; packers and SSSV MD (ft): 9124' /
7" x 4-1/2" TIW 'HBBP' Perm Packer 10265'
12. Attachments: 13. Well Class after proposed work:
~ Description Summary of Proposal D BOP Sketch D Exploratory ~ Development D Service
D Detailed Operations Program
14. Estimated Date for 15. Well Status after proposed work: /
Commencing Operations: June 1, 2006 DOil DGas D Plugged ~ Abandoned
16. Verbal Approval: Date: DWAG DGINJ DWINJ D WDSPL
Commission Representative:
17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Sean McLaughlin, 564-4387
Printed Name Sean McLaughlin Title CT Drilling Engineer
Sianature t~ M it/\... :.- Date Slizft£ Prepared By Name/Number:
Phone 564-4387 Terrie Hubble, 564-4628
Commission Use Only , ,
Conditions of approval: Notify Commission so that a representative may witness I Sundry Number: c30 (¡¡ - lï {p
D Plug Integrity D BOP Test D Mechanical Integrity Test D Location Clearance
Other: ,4-r P hP'ie-J (-or"^- ! (.? - 4-~ vuí,.¿J ~r ~UJ-v.~1L ~,( q'ZtA-·
RBDMS 8F! MAY .1 7 2DD6
Subsequent Form Required: 4ÞOJ ~I¡
lO -
. 'Á~ 'A APPROVED BY Date S-/t. -OÞ
Approved By: COMMISSIONER THE COMMISSION
Form 10-403 Revised 07/2005 OR~ N1\ - ' Submit In Duplicate
e
e
To:
Winton Aubert
Petroleum Engineer
Alaska Oil & Gas Conservation Commission
Obp
From: Sean McLaughlin
CTD Engineer
Date: May 10, 2006
Re: G-24 Sundry Approval
Sundry approval is requested for well G-24. G-24 was originally drilled in 1986 as a vertical Zone 1B /
2A producer. Even though the well was completed in 1986 no perforations were shot until December
6, 1987. At this time 48' of Zone 1B initial perforations were shot (10,284'-10,332' md). Following
shooting these perfs the well would not flow. It was thought that the previous perfs were shot off depth
so the same interval was targeted and shot again on December 17, 1987. Again the well would not
flow. The well remained like this until January of 1988 when 46' of Zone 2A sands were perforated
(10,242'-10,268' md). These add perfs put this well online. A spinner was run in February of 1988 to
try and determine ifthe Zone 1B perfs were contributing to the well's production or not. Analysis of
the log showed that 100% of the production was coming from the 2A perfs and nothing was coming
from the initial perforations.
In January of 1998 the gas rate jumped from 3 mmscf up to 20 mmscf with no wellwork or well
intervention. In response to this a Borax PNL was run to evaluate if a channel had formed and linked
the perforations to gas. The borax log showed cross flow between the two sets of perfs but showed no
indication of a channel. Shortly after the gas rate led to the well being used as a cycle well. The well
continued on its cycle behavior until the first quarter of 1991 when the well received a rig workover
(RWO). The scope of the RWO was to swap the tubing and to straddle the Zone 2A perfs and place a
sliding sleeve that would allow these perfs to be re-opened at a later date. Also at this time an
additional 20' of Zone 1B perfs were shot. Directly following the RWO the Zone 1B perforations in
the well were fractured with 96,000 lbs going behind the pipe. As the well was kept online the GOR
trend increased at the same rate as before the RWO and resumed its cycle behavior 6 months later.
The well's on-time started to degrade, so in January of 1992 the sliding sleeve valve was opened to
allow the Zone 2A perforations to produce again. Little to no change was observed in production.
Later in the month the sliding sleeve was shut and again there was little to no change in production.
To diagnose the source ofthe high gas production a spinner was run in the well in October of 1992.
The spinner showed that the Zone 2 straddle's lower packer was leaking and that the Zone 2A sands
were producing since the fracture job. The well has remained a cycle well.
REASON FOR SIDETRACK:
The well has been used as a cycle well for the majority of its life (since 1991) and during this time did
not see over 50% on-time. The current condition of the well has led to an on-time prediction of <1 0%
and has caused the remaining value to fall and become available for sidetrack. When brought online
the well cycles from a GOR of 50k to over 60k within two days. Also wellwork options that would
increase this well's remaining value have been exhausted. It is for these reasons thát this well is
recommended to be horizontally sidetracked to reach new reserves.
The sidetrack is planned on or around October 1. 2006. The sidetrack, G-24A, will exit the existing 4-
1/2" tubing and kick off in Zone 2 and target Zone 1 landing. The existing perforations will be
isolated by a CIBP and a cement plug job. The following describes work planned and is submitted as
an attachment to Form 10-403. A schematic diagram of the proposed sidetrack is attached for reference.
Pre-Rig Work:
1. 0 AC-LDS; AC-PPPOT-IC, T
2. E Set CIBP at 10270' /
3. S Open sliding sleeve
4. S Run dummy whipstock drift
5. 0 Establish an injection rate
6. E Set ce~~tretainer
7. C Pump 35 l.øt 15.8 ppg cement into IA and perforations
8. 0 MIT- 'è?.\;
9. E Set WS at 10170'
10. 0 Bleed gas lift and production flowlines down to zero and blind flange
11. 0 Remove wellhouse, level pad
The pre CTD work is slated to begin on June 1, 2006.
TM.S It? - 40 3 ~fÞO flA.-I.
Rig Work:
1. MIRV and test BOPE to 250 psi low and 3500 psi high.
2. Mill 3.8" window at 10170'and 10' of rat hole. Swap the well to Flo-Pro.
3. Drill Build: 4.125" OH, 330' (25 deg/l00 planned)
4. Drill Lateral: 4.125" OH, 2034' (12 deg/l00 planned), with resistivity
5. MAD pass with resistivity tools in memory mode
6. Run 3-3/16" 2-7/8" solid liner leaving TOL at 9970'
7. Pump primary cement leaving TOC at 9970'
8. Cleanout liner and MCNL/GR/CCL log
9. Test liner lap to 2000 psi.
10. Perforate liner per asset instructions (~800')
11. Freeze protect well, RDMO
e
e
Post-Rig Work:
1. Move wellhouse, Install production flowline
2. Run GLVs
3. Flowback well to separator
Sean McLaughlin
CTD Engineer
564-4387
CC: Well File
Sondra Stewman/Terrie Hubble
TREE =
WELLHE;A[).=
ACTUATOR =
KB. ELEV =
BF. ELEV =
KOP=
Max Angle =
Datum MD =
Datum 1VD =
4"CAMERON
McEVOY
OTIS
72,06'
35,91'
2900'
43 @ 10346'
10105'
8800' SS
13-3/8" CSG, 72#, L-80, ID = 12.347" I
e
Minimum ID = 3.725" @ 10278'
4-1/2" PARKER SWN NIPPLE
I TOP OF 7" LNR
9-5/8" CSG, 47#, L-80, ID = 8,681" I
G-24
/¡;:;eOTES:
.
I 4-1/2" TBG, 12.6#, L-80, .0152 bpf, ID = 3.958" H 10282' I
ÆRFORA TION SUMrvlARY
REF LOG: BHCS ON 12/16/86
ANGLE AT TOP ÆRF: 42 @ 10242'
Note: Refer to A'oduction DB for historical perf data
SIZE SPF INTERVAL OPNISQZ DATE
3-3/8" 4 10242 - 10268 0 02/06/87
3-3/8" 8 10284 - 10332 0 02/06/87
3-3/8" 4 10340 - 10360 0 02/25/91
I PSTDI
7" LNR, 26#, L-80, .0383 bpf, ID = 6.276" I
DATE
12106187
02113191
07/17/01
11/01/01
02/26/03
1 0/08/05
REV BY
COMMENTS
ORIGINAL COM PLETION
RIG WORKOVER
CORRECTIONS
SURF LOC CORRECTION
rvlAX ANGLE CORRECTION
GL V CORRECTION
RNITP
WBITP
CMO/KK
JPK/TLH
10397'
10475'
2110' -I 4-1/2"SSSVOTISLNDNGNIP,ID=3,813" I
ST MD
5 2983
4 4986
3 6981
2 8817
1 9087
1VD
2911
4685
6288
7791
8002
GAS LIFT rvlANDRELS
DEV TYÆ VLV LATCH
5 MERLA DMY RA
35 MERLA DMY RA
35 MERLA DMY RA
38 MERLA DMY RA
39 MERLA DMY RA
PORT DATE
o 04/03/94
o 04/03/94
o 04/03/94
o 04/03/94
o 04/03/94
9116' - 4-1/2"PARKERSWSNIP,ID=3.813" I
9124'
1 0323'
DA TE REV BY COMMENTS
11/05/05 ???/TLH CSG CORRECTIONS
9470' 7" rvlARKER JOINT I
I I 10216' 4-1/2" OTIS XA SLIDING SLV, ID = 3.813" I
10230' TOP OF BLAST JOINTS
10264' BTM OF BLAST JOINTS I
10265' 7" x 4-1/2" TIW HBBP ÆRM PKR, ID = 3,875"
10273' 4-1/2" PARKER SWS NIP, ID = 3.813"
10278' 4-1/2" PARKER SWN NIP, ID = 3.725"
10282' -I 4-1/2" TTL WLEG I
10288' H ELMD TT LOGGED 02/25/91
9-5/8" x 4-1/2" TIW HBBP-R REf
PKR W/LA TCH, ID = 4,00"
FISH - BOW SPRING LOST 02/11/93
25" X 0.05" X 0.1875"
PRUDHOE BAY UNrr
WELL: 8-24
PERMrr No: 186-1830
API No: 50-029-21671-00
SEC 12, T11N, R13E
BP Exploration (Alaska)
REF LOG: SHeS ON 12/16/86
ANGLE AT 10242'
current
I
G24
'I
O,()5
;111
1988 89 90 91 92
94 95 96 97 98
Dale
2000 01 02 03 04
Bottom Hole Location Recalcs
Subject: Bottom Hole Location Recalcs
Date: Moa, 24 Mar 2003 14:48:38,0600
}4i'0mi "Hubble, Terrie L" <HubbieT~BP.com>
To: "Bob Fleckenstein (E-mail)" <bob_fleckenstein~admin.state.ak.us>
Hi Bob,
Per your request, here are the recalculated bottom hole locations for the
four wells in question:
L2-26, TD = 11,495'; Permit #185-104, 50-029-21359-00
442' FSL (4838' FNL), 5067' FEL (212' FWL), Sec. 08, TllN, R15E
G-24, TD = 10,475'; Permit #186-I83,!{50-029-21671-00
4412' FSL (868' FNL), 4761' FEL (170' FWL), Sec. 18, TllN, R14E
GC-1E, TD = 6,614'; Permit #189-068, 50-029-21956-00
1939' FSL (3341' FNL), 4939' FEL (2' FWL), Sec. 18, TllN, R14E
05-36, TD = 10,664; Permit #191-078, 50~29-22182-00
4012' FSL (1267' FNL), 4986' FEL (13' FWL), Sec. !31, TllN, R15E
If you need anything else, please don't hesitate to call.
Terrie Hubble
GPB Drilling & Wells
564-4628, MBT-5, Cube 718
1 of 1 3/25/2003 12:51 PM
LARRY GRANT
Attn. ALASKA OIL + GAS CONSERVATION
3001 PORCUPINE DRIVE
ANCHORAGE
AK, 99501.
Dear Sir/Madam,
Reference:
BP
G-24
PRUDHOE BAY
NORTH SLOPE, AK
Enclosed, please find the data as described below:
Tapes/Diskettes: 1 LDWG TAPE + LIS
Date:
RE:
20 January 1995
Transmittal of Data
ECC ~: 4600.03
Sent by: MAIL
Data: CN/GR
Run ~ 1
Please sign and return to: Attn. Rodney D. Paulson
Atlas Wireline Services
5600 B Street
Suite 201
Anchorage, AK 99518
Or FAX to (907) 563-7803
Received by: Date:
RECEIVED
.,-.~;z.:~otec, i?,~~ ' .___.hal Data Oente~
JAN 2 7 1995
Commission
a-~.~, ~ I ~ -i%~ . ~ .
~aska Oil & Gas Cons.
~ecezve~~ by
Da'aa . _ ~' -
. ..
RECEIVED
JAN 25 1995
Alaska Oil & Gas Cons. Commission
Anchorage
LARRY GRANT
Attn. ALASKA OIL + GAS CONSERVATION
3001 PORCUPINE DRIVE
ANCHORAGE
AK, 99501.
Date: 16 January 1995
RE: Transmittal of Data
Sent by~ MAIL
Dear Sir/Madam,
Enclosed, please find the data as described below:
WELL # DESCRIPTION
1 PDK/TEMP FINAL BL+RF
1 CN/GR FINAL BL + RF
·
1 PDK/TEMP FINAL BL+RF
1 PLS FINAL BL+RF
1GR/CCL FINAL BL+RF
ECC No.
Run # 1 542.02
Run # 1 4600.03
Run # 1 6344.00
Run # 1 6344.01
Run # 1 6344.02
Please sign and return to: Attn. Rodney D. Paulson
Atlas Wireline Services
5600 B Street
Suite 201
Anchorage, AK 99518
Or FAX to (907) 563-7803
Received by: Date:
LARRY GRANT
Attn. ALASKA OIL + GAS CONSERVATION
3001 PORCUPINE DRIVE
ANCHORAGE
AK, 99501.
Date: 29 December 1994
Transmittal of Data
Sent by: MAIL
Dear Sir/Madam,
Enclosed, please find the data as described below:
WELL # DESCRIPTION
%
7 ~. [%B-15 (21-13-11-14)
/O~% 'J-14 (!0-11-!3)
1 PFC/PERF FINAL BL+RF
1 CCL FINAL BL+RF
1 PLS-STATIC FNL BL+RF
1 PLS FINAL BL+RF
1 PFC/PERF FINAL BL+RF
1 CCL/PERF FINAL BL+RF
1 PLS FINAL BL+RF
1 PFC/PERF FINAL BL+RF
Run # 1
Run # 1
Run # 1
Run
Run # _
Run
Run # 1
Run # 1
ECC No.
2012.04
4040.01
4600.02
5798.11
5972.01
6170.08
6170.07
6287.01
Please sign and return t°: At~a~R0dney ~s°n J Atlas Wi-r~e~e Services
~ /~chorage, AK 99518
~ /~ O~ F~ to (907) 563-7803
Received by~~/ Date
/
BP EXPLORATION
BP Exploration (Alaska) Inc.
900 East Benson Boulevard
P.O. Box 196612
Anchorage, Alaska 99519-6612
(907) 561-5111
TO: DISTRIBUTION Date: 12/04/92
T#:84145
FROM'
Information Control
Well Records MB3-3
SUBJECT: BP CASED HOLE
Enclosed is your copy of the material listed below, if you have any questions, please contact BP
Well Records at (907) 564-4004.
?'~-..¢"Z. G-24
?z-~ R-061
R-30
~'~-¢~ H-28
~'~'" y? R-01
Z ¢,/", ~ X-241
GAS ENTRY SURVY 09-OCT-92 #1
INJECTION PROF 17-OCT-92 #1
PROD PROF SURVY15-OCT-92 #1
LEAK DET LOG 07-OCT-92 #1
GAS LIF-i' SUR'v~f' 07-OCT-92 '#1
INJECT PROF LOG 12-OCT-92 #1
10150-10315 CAMCO
9800-10200 CAMCO
11100-11580 CAMCO
SURF-11700 CAMCO.
· 2500-9174 CAMCO
9050-9456 CAMCO
#
5"
5"
5"
5"
CEIVED
DEC 1 8 1992
Alaska 0il & Gas Cons. Commission
Anchorage
Distribution:
ARCO
CHEVRON
EXXON
MOBIL
PHILLIPS
STATE OF ALASKA
ARCHIVES
A.FRANKENBURG
BP EXPLORATION
BP Exo~ora[[on (Alaska) Inc.
900 Ecs! Benson @oulevarO
PO. Box 196612
Anchorage, AJaska 995~.9-6612
(907) 561-5111
DATE: 10/07/91
T~ 82899
BP PRESSURE REPORTS
Enclosed is your copy of the materials listed below.
If you have any questions, please conmact BP Well
Records at (907) 564-4004.
H-24~ PRES 07/'31/91 REF.~
~9~2~' J-09 f PRES 07/31/91 REF#
.~"~ Y-30 ~ PRES 05/25/91 REF~
~;-~'7 C-35.~ P~S 08/04/91 REF~
~ C-02~ PRES 07/31/91 ~F~
?/~"~ F-17~ PRES 08/13/91 ~F~
f,-~ F-42~ P~S 09/04/91 ~F%
~.~f J-03~ P~S 09/04/91 ~F~
~- ~ G-24~ P~S 09/03/91 REF~
~o'~3 A-i
FU44 ~"' '~'~P~S 09/04/9I .... :~ ~F~
~/-~$ F-45~ P~S 09/02/91 ~F~
~/~ ~;~ P'03~ PRES 09/10/91 ~F~
~;-Jg M-16~ P~S 08/26/91 ~F~
~..r~ F-03~ P~S 08/30/91 ~F%
..~.. ~ R-04'~' PRES 08/26/91 REF~
~-f~ G-11'~ P~S 08/31/91 ~F~
}~-~' W-11'~ P~S 08/21/91 ~F~
,~"~ Z-28 ~ P~S 08/22/91 ~F~
.,~3f F-38-- PRES 09/06/91 ~F~
3~'' ':: G-26~- PRES 09/04/91 REF~
~?'~ G-32,/ PRES 09/04/91 ~F~
?J-~'7 G-05-~ P~S 09/03/91 ~F~
~-~ B-32 ~ P~S 09/15/91 REF~
,~ .. / F-24 PRES 09/03/91 REF~
STATIC SURVEY
STATIC SURVEY
STATIC SURVEY
STATIC SURVEY
STATIC SURVEY
GRADIENT
BHP STATIC
BHP STATIC
BHP
BHP
BHP
HLS
HLS
HLS
HLS
HLS
HLS
CAMCO
CAMCO
STATIC CAMCO
FLOW CAMCO
STATIC CAMCO
BHP STATIC CAMCO
BHP FLOW CAMCO
BHP STATIC CAMCO
BHP FLOW CAMCO
BHP STATIC CAMCO
BHP STATIC CAMCO
BHP STATIC CAMCO
BHP STATIC CAMCO
BHP STATIC CA-MCO
BHP STATIC CAMCO
BHP S~A~C CAMCO
BHP STATIC CAMCO
BHP STATIC CAMCO
Information Con, roi
Well Records
Adrian J. Martin
STATE OF ALASKA
ALA~r,A OIL AND GAS CONSERVATION COMMISSI~,~
REPORT OF SUNDRY WELL OPERATIONS
1. Operations performed: Operation shutdown __ Stimulate__ Plugging~
Pull tubing X Alter casing Repair well
Perforate
Other
2. Name of Operator
BP Exploration
3. Address
P. 0. Box 196612, Anchorage, Alaska 99519-6612
4. Location of well at surface
2703' SNL, 1974' WEL, SEC. 12, T11N, R13E
At top of productive interval
355' SNL, 29' EWL, SEC. 18, T11N, R14E
At effective depth
818'SNL, 156'EWL, SEC. 18, T11N, R14E
At total depth
869'SNL, 172'EWL, SEC. 18, T11N, R14E
5. Type of Well:
Development X
Exploratory
Stratigraphic
Service
6. Datum elevation (DF or KB)
KBE = 72.06' feet
7. Unit or Property name
Prudhoe Bay Unit
8. Well number
G-24 (11-18-11-14)
9. Permit number/approval number
86-183
10. APl number
50- 029-21671
11. Field/Pool
Prudhoe Bay Field/Oil Pool
12. Present well condition summary
Total depth: measured
true vertical
Effective depth: measured
true vertical
10475' feet Plugs (measured)
9146' feet BKB
10390' feet Junk (measured)
9084' feet BKB
Casing
Structural
Conductor
Surface
Intermediate
Production
Liner
Perforation depth:
measured
Length
Size Cemented Measured depth True vertical depth
BKB
20" 9 cu yds 146' 146'
13-3/8" 3723 cu ft 2693' 2693'
9-5/8" 575 cuft 9495' 8393'
110'
2657'
9459'
1266' 383 cu fl
10242'-10268', 10284'- 10332'
9209'-10475' 8169~9146'
RECEIVED
true vertical subsea
8903'-8970' (two intervals) JUL- 1 t991
Tubing (size, grade, and measured depth) 4-1/2" L-80 to 10283' Alaska .0JJ & Gas Cons. C0.mi~ljssi0tl
~,nch0rage
Packers and SSSV (type and measured depth) 9-5/8" Retrievable Pkr @ 9124', 7" Permanent Pkr @ 10265', SSSV @ 2110'
13. Stimulation or cement squeeze summary
Intervals treated (measured)
Treatment description including volumes used and final pressure
14.
Prior to well operation
Subsequent to operation
Representative Daily Average Production or In!ection Data
OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure
1641 12181 13 0
270 1864 6 0
Tubing Pressure
1878
292
15. Attachments
Copies of Logs and Surveys run
Daily Report of Well Operations × .
16. Status of well classification as:
Oil x Gas Suspended
Service
17. I hereby certify that the fore/ge~g is true and correct to the best of my knowledge.
Title Completion En~ineerin~ Supervisor
Si~ned/~ ~,~-.- o~,o./~'
Form 10-404 Rev 0~/15/8r'8 ¢
Date
SUBMIT IN DUPLICATE
Well G-24 W0rkover Procedure
Attachment i
Waited on weather to lower derrick. Accepted rig at 0800 hours on 2/5/91.
Pulled 4-1/2" tubing. Replaced 9-5/8" packoff. Milled 9-5/8" packer.
Speared packer. Cleaned out to 10,351. RIH with 9-5/8" scraper. Tested 9-
5/8 casing and liner lap. Cleaned out junk to 10390'.
8.5" and 5.95" gauge ring/junk baskets. RIH with
completion. Logged packers into position. NU tree.
tubing and annulus.
RIH 7" scraper. Ran
4-1/2" straddle
Set packers. Tested
Released rig at 0900 hours on 2/13/91. 8.1 Days
RE'¢EIVED
JUL - 1 t991
Alaska Oil & Gas Cons. Commission
Anchorage
BP EXPLORATION (ALASKA), INC.
DAILY WORKOVER REPORT: ..P..RUDHOE BAY UNIT
As of 0600 Hrs. Tuesday, February_ 5, 1991
WELL: 6-24 (11-18;-11-14) Rig'
D..oyon Rig #16
Day: O
Expense AFE Number:
Expense AFE Amount =
.,145051
Current Field Costs =
Estimated Final Cost =
Current Operation: Moving rig from Z-pad.
Summary_ of Last 84 Hours
Wait on weather to lower derrick.
Reviewed By'~'~(~.
JUL -- 7 ~99~
~lasl~a Oil & ¢~as COns, Commission
Anchorage
BP EXPLORATION (ALASKA), INC.
DAILY WORKOVER REPORT: PRUDHOE BAY UNIT
As of 0600 Hrs. _.Wednesday1 Feb,,ncary 6, 1991
WELL: G-24 (11-18-11-14~ Rig:
Doyon Rig #16
Day: 1
Expense AFE Number:
Expense AFE Amount =
145051
Current Field Costs =
Estimated Final Cost =
Current Operation' Pull and lay down 4-1/2" tubing.
Summary of Last ~4, Hours
Accept rig at 0800 hours on 2/5/91. Circulate diesel.from well. ND tree, NU BOP and test.
lay down 4-1/2" tubing.
Pull and
Reviewed By:
BP EXPLORATION (ALASKA), INC.
DAILY WORKOVER REPORT: PRUDHOE BAY UNIT
As of 0600 Hrs. Thursday, February 7, 1991.
WELL: 6-24 (11-18-11.14) Rig'
Doyon Rig #16
Day: 2
Expense AFE Number:
Expense AFE Amount =
145051
Current Field Costs =
Estimated Final Cost =
Current Operation: RIH with overshot.
Summary of Last 2_&4 Hours
Lay down 4-1/2" tubing. Replace 9-5/8" packoff. RIH to recover slick stick.
Reviewed By' ~~
BP EXPLORATION (ALASKA), INC.
DAILY WORKOVER REPORT:
As of 0600 Hrs. Friday, February 8, 1991
WELL: G-24 (11-18-11-14)
PRIdDHOE BAY UNIT
Rig:
D.oyon Rig #16
Day: ,3
Expense AFE Number:
Expense AFE Amount =
145051
Current Field Costs =
Estimated Final Cost =
Current Operation: Milling packer.
Summary_ of Last 24 Hours
Recover slick stick. RIH and mill 9-5/8" packer.
Reviewed By:;~~~_
BP EXPLORATION (ALASKA), INC.
DAILY WORKOVER REPORT: PRUDHOE BAY UNIT
As of 0600 Hrs. Monday, February 11, 1991
WELL: G-24 (11-18-11.14), Rig:
Doyon Rig #16.
Day: 6
Expense AFE Number:
Expense AFE Amount =
145051
Current Field Costs --
Estimated Final Cost =
Current Operation: Reverse circulate hole clean.
.Summary of Last 7~ Hours
Mill on 9-5/8" packer. POH.. RIH and spear packer, POH. RIH with 6" bit to 10,351' and spot LCM
pill. POH. RIH with 9-5/8" scraper to 9,203'. Circulate and POH. RIH with 7" test packer and test
9-5/8" casing and liner lap to 3000 psi. POH. RIH with 6" mill and clean out junk to 10,390'.
Circulate and POH. RIH with 7" scraper to 10,382'. Reverse circulate hole clean.
Reviewed By: '~'¢
BP EXPLORATION (ALASKA), INC.
DAILY WORKOVER REPORT: PRUDHOE BAY UNIT
As of 0600 Hrs. Tuesday, February 12, 1991_.
WELL: 6-24 (11-18-11-14) Rig:
Doyon Rig #16
Day: Z
Expense AFE Number:
Expense AFE Amount =
145051
Current Field Costs =
Estimated Final Cost =
Current Operation: RIH with 4-1/2" completion.
Summ~ry 9f Last 24 Hours
Drill pipe stuck on bottom, work free, POH. Run 8.5" and 5.95" WL gauge ring/junk baskets. Lay
down drill pipe. Rig up and RIH with 4-1/2" straddle completion.
Reviewed By:
BP EXPLORATION (ALASKA), INC.
DAILY WORKOVER REPORT: PRIdDHOE BAY UNIT
As of 0600 Hrs. Wednesday, February 13. 1991
WELL: 6-24 (11-18-11-14), Rig:
Doyon Rig #16
Day: _8_
Expense AFE Number:
Expense AFE Amount =
145051
Current Field Costs =
Estimated Final Cost =
Current Operation: Pressure up to set packers.
$~mma~ry_ of Last 24 Hours
Finish running tubing. RU WL and log packers into position. ND BOP's, NU tree and test.
ball, pressure up to set packers.
Drop
Reviewed By:-'~'2~(2
BP EXPLORATION (ALASKA), INC.
DAILY WORKOVER REPORT: PRUDHOE BAy UNIT
As of 0600 Hrs. Thursday,. February 14, 1991
WELL: G-24 (11-18-11-14) Rig:
D..oyon Rig #16
Day: 9
Expense AFE Number:
Expense AFE Amount =
145051
Current Field Costs =
Estimated Final Cost =
Current Operation' Released rig at 0900 hours on 2/13/91.
Summary_ of Last 24 Hours
Set packers and test tubing to 4000 psi. Test annulus to 2500 psi. Freeze protect well. Set BPV.
Release rig at 0900 hours on 2/13/91.
Reviewed By: ~>_~('
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
REPORT OF SUNDRY WELL OPERATIONS
1. Operations performed: Operation shutdown Stimulate × Plugging Perforate
Pull tubing Alter casing Repair well Other
2. Name of Operator
BP Exploration (Alaska) Inc.
3. Address
P. O. Box 196612, Anchorage, Alaska 99519-6612
4. Location of well at surface
2703' SNL, 1974' WEL, SEC. 12, T11N, R13E, UPM
At top of productive interval
355'SNL, 29'EWL, SEC. 18, T11N, R14E, UPM
At effective depth
818'SNL, 156'EWL, SEC. 18, T11N, R14E, UPM
At total depth
869' SNL, 172' EWL, SEC. 18, T11N, R14E, UPM
12. Present well condition summary
Total depth: measured
true vertical
Effective depth: measured
true vertical
5. Type of Well:
Development X
Exploratory
Stratigraphic
Service
10475feet Plugs (measured)
9146feet
10397feet Junk (measured)
9089feet
Casing Length Size Cemented
Structural --
Conductor 110' 20" 9 c.y.
Sudace 2657' 13-3/8" 3723 c.f.
Intermediate 9459' 9-5/8" 575 c.f.
Production --
Liner 1266' 7' 383 c.f.
Perforation depth: measured 10242'-10268', 10284'-10332'
6. Datum elevation (DF or KB)
KBE = 72.06 AMSL feet
7. Unit or Property name
Prudhoe Bay Unit
, ,, ,,,,,
8. Well number
G-24 (11-18-11-14) PBU
9. Permit number/approval number
7-1481
10. APl number
50- 029-21671
11. Field/Pool
Prudhoe Oil Pool
Measured depth
146'
2693'
9495'
True vertical depth
BKB
146'
2693'
8393'
9209~10475'
8169'-9146'
true vertical subsea
8903'-8970' (two intervals)
Tubing (size, grade, and measured depth) 4-1/2"L-80 to 9162' with 4-1/2" tailpipe to 9295'
Packers and SSSV (type and measured depth) 9-5/8" TIW packer at 9162'; 4-1/2" SSSV at 2050'
13. Stimulation or cement squeeze summary
RECEIVED
APR 2 9 t991
Alaska.0il & Gas Cons. C0m iSs'
Ill I . '
/k~ligi iUitI~I;J
Intervals treated (measured)
Treatment description including volumes used and final pressure
14.
Representative Daily Average Production or Injection Data
OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure
Tubing Pressure
Prior to well operation 580 3900 10 0
1321
Subsequent to operation 1360 520 10
i 5. Attachments 16. Status of well classification as:
Copies of Logs and Surveys run
Daily Re~ort of Well Operajions Oil X Gas Suspended
i7. I herebi)ertif,y that t~fo~going is true and correct to the best of my knowledge.
Form 10~404 Rev (J6~88 ' ~)
1477
Service
Date
SUBMIT IN DUPLICATE
WELL G-24 (11.18.11.14} PBU
~;TIMULATION OPERATION
Hydraulic fracture and additional perforation was done for well G-24 on February 25, 1991
and Mamh 7, 1991.
~;I,IMMARY:
REFRENCE LOG: BHCS- (12/16/86)
GUNS- 3 3/8", 4 SPF, 60-120 DEGREE PHASING
Tagged TD=10383'
GUN No. INTERVAL
1 10340'-10360'
Total of 98,000 pounds carbolite pumped. Total of 96,000 pounds of carbolite behind pipe.
Carbolite flushed to +/- 10120'. Well was tested and put on production.
RECEIVED
APR 2 9 t99'~
Alaska 0il & Gas Cons. Commission
Anchorage
mr:3/27/91
BP EXPLORATION
BP Exploration (Alaska) Inc.
900 East Benson Boulevard
RO. Box 196612
Anchorage, Alaska 99519-6612
(907) 561-5111
TO: DISTRIBUTION Date :03/04/91
T#:82202
FROM:
SUBJECT:
Information Control
Well Records LR2-1
BP CASED HOLE FINALS
Enclosed is your copy of the material listed below. If you have any questions, please contact BP
Well Records at (907) 564-4445.
F-42
F-44
F-44
F-44
. n~, F-44
% ~'~ ~G-24
Completion 02/24/91 #1 10431-11558 Sch 5"
CBT 02/23/91 #1 8892-9782 Sch 5"
CET 02/23/91 //1 8892-9702 Sch 5"
Perf 02/24/91 # 1 8892-9782 Sch 5"
Tubing Position 02/25/91 #1 8650-9760 Sch 5"
Completion 02/25/91 #1 10085-10360 Sch 5"
Distribution:
ARCO
CHEVRON
EXXON
GEOSCIENCES
MOBIL
PHILLIPS
RESERVOIR
STATE OF ALASKA
ARCHIVES
BP EXPLORATION
BP Exploration (Alaska) Inc.
900 East Benson Boulevard
RO, Box 196612
Anchorage, Alaska 99519-6612
(907) 561-5111
TO: DISTRIBUTION
Date: 02/19/91
T#:82094
FROM:
Information Control
Well Records LR2-1
SUBJECT: ,BP CASED HOLE FINALS~
Enclosed is your copy of the material listed below. If you have any questions, please contact BP
Well Records at {@07) 564-4445.
"' C-15 PFC LOG 02/14/91 #1 9283-9767 ATLAS
~ D-27 COLLAR 02/12/91 #1 9392-9640 ATLAS
%~G-16 PFC LOG 02/13/91 #1 9800-10032 ATLAS
G-24 GR LOG 02/12/91 #1 9600-10396 ATLAS
S-02 COLLAR 02/14/91 #1 9845-10713 ATLAS
#
5"
5"
5"
5"
Distribution:
ARCO
CHEVRON
EXXON
GEOSCIENCES
MOBIL
PHILLIPS
RESERVOIR
STATE OF ALASKA
ARCHIVES
BP EXPLORATION
BP Exploration (Alaska) Inc.
900 East Benson Boulevard
RO. Box 196612
Anchorage, Alaska 99519-6612
(907) 561-5111
TO: ARCO DATE: 10/10/90
EXXON T#: 81592
PHILLIPS
STATE OF ALASKA
ARCHIVES
SYSTEM Tape & Transmittal Only
BP MAGNETIC LIS TAPE & LISTING
Enclosed is your copy of the material listed below. If you have any questions, please contact BP
Well Records at (907) 564-4445.
~.~4 c 10,04,~0 ~. ~00.,0~40 ~A~os.#o~ ~~~
ATLAS#4600 1600BPI AP!~50-029-21671
Information Control
Well Records LR 2-1
J. Dietz/S. McCurry
RECEIVED
0CT 1 9 1990
AJaska 011 & Gas Cons. Commission
Anchorage
BP EXPLORATION
BP Exploration (Alaska) Inc.
900 East Benson Boulevard
P.O. Box 196612
Anchorage, Alaska 99519-6612
(907) 561-5111
TO: DISTRIBUTION Date: 10/09/90
T#:81587
FROM:
SUBJECT:
Information Control
Well Records LR2-1
Bp CASED H~LE F/NAL,~
Enclosed is your copy of the matedal listed below. If you have any questions, please contact BP
Well Records at (907) 564-4445.
G-01 CCL 10/06/90 #1 8600-10123 ATLAS
G-01 PROD PACKER 10/06/90 #1 9830-10044 ATLAS
G-24 CNL/GR 10/04/90 #1 9500-10340 ATLAS
Distribution:
ARCO
CHEVRON
EXXON
GEOSCIENCES
MOBIL
PHILLIPS
RESERVOIR
STATE OF ALASKA
ARCHIVES
_
BP EXPLORATION
BP Explorauon (Alaska) Inc.
900 East Benson Boulevara
PO. Box 196612
Anchorage, AlasKa 99519-6612
(907) 561-5111
To: Distribution
Date: 09/11/89
Transmittal: 80346
From:
Information Control
Well Records LR2-1
Subject: BP CASED HOLE FINAL LOGS
Enclosed is your copy of the material listed below. If you have any
questions, please contact BP Well Records at (907) 564-4445.
A-19 PROD-F 09/01/89 ~1 8800-9639 Sch
C-13 PERF 09/02/89 91 11250-11585 Sch
G-24 TDT-P 08/30/89 ~1 9500-10342 Sch
Z-09 CBT 09/04/89 ~! 10024-11155 Sch
Z-09 CET 09/24/89 ~1 10024-11175 Sch 5"
Z-09 COMPLETION 09/04/89 91 10700-11510 Sch
'Distribution:
ARCO
CHEVRON
EXXON
GEOSCIENCES
HOUSTON
MOBIL
PHILLIPS
V~T~
ARCHIVES
~Naska Oil & Gas CoRs. Commissi(J~o
BP EXPLORATION
To
HOUSTON
ARCO
CHEVRON
EXXON
MOBIL
PHILLIPS
~STATE OF~ALASKA~
GEOSCIENCES
RESERVOIR
ARCHIVES
BP Exploration (Alaska) Inc.
900 East Benson Boulevard
RO. Box 196612
Anchorage, Alaska 99519-6612
(907) 561-5111
Date: 25-JUL-89
T#: 80204
BP CASED HOLE FINAL LOGS
The following material is being submitted herewith. Please acknowledge
receipt by signing a copy of this letter and returning it to this office:
~'~-24 TEMP il-JUL-89 #1 10050-10364 OTIS 5'
~M~-29 INJ 15-JUL-89 #1 9700-9980 OTIS
Received:
Date:
Information Control
Well Records LR2-1
J. Dietz/S. McCurry
INOEXED
TO:
DALLAS
ARCO
CHEVRON
EXXON
TEXACO
MOBIL
PHILLIPS
STATE OF ALASKA
ARCHIVES
STANDARD
ALASKA PRO DI. JC'I' I C.'.'.')N
07/13/88
Date:
79086
REFERENCE:
SAPC FINAL DATA - PRESSURE SURVEY DATA
The following mateclal is being submitted herewith. Please acknowledge receipt by
signing a copy of this letter and returning It to this office:
·
E-18
E-26
E-27
G-04
G-24
K-01
K-12
N-06
R-07I
W-39
Y-05I
Z-06
Flowing Gradient 06/23/88 Camco
Static Gradient 06/26/88 Otis
Static Gradient 06/24/88 Otis
Static Gradient 07/02/88 Camco
Static Gradient 06/24/88 Otis
Static Gradient 06/26/88 Otis
Static Gradient 07/02/88 Camco
Static Gradient 06/23/88 Otis
Static Gradient 06/20/88 Otis
Static Gradient 07/01/88 Camco
Static Gradient 06/21/88 Otis
Static Gradient 07/01/88 Camco
Alaska Oil & Cas~,,.r'~--,, ~. Commission
Am: :, '..(je
Race ! ved
A unJf Ot the, O,,gJr~31 .~eondo,d C~I Co~por~1,
founded ;. Cle-elond. 0~;o. i~ 1810
Jennifer Dietz
I NFORMAT I ON CONTROL
Wel I Records LR2-1
INDEXED
TO:
DALLAS
ARGO
CHEVRON
E~XON
TEXACO
MOBIL
PHILLIPS
STATE OF ALASKA
S'rANDARD
ALASKA PRODUCTION
Date: 03/09/88
78641
REFERENCE:
SAPC FINAL DATA - PRESSURE SURVEY DATA
The following material Is being submitted herewith. Please acknowledge receipt by
signing a copy of this let~rer and returning It to this office:
~D-26 Static Gradient 02/19/88 Camco
"~ G~_24 ,, " 02/20/88 Camco
~ K-13 ,, ,, 02/19/88 Camco
~ R-23 " " 03/05/88 Camco
~ X-16 " " 03/03/88 Camco
Slanda~d A |o-..I. o
P~',t>du( f~on Compon.
90<:) Eo',~ B<'~,.o,',
PO B.o. 196612
An( ho~oge' AIo,d-
i907~ 664-51 I~
INDEXED
DALI~\S
ARCO
CHEVRON STANDARD
AL ASK. A PPODUCTIOIXJ
E,'~XO N
TEXACO Date: 02/18/88
TO: MOBIL Ti: 78559
PHILLIPS
GEOSC IENCES
REFERENCE:
SAPC CASED HOLE FINAL LOGS
The following material Is being submitted herewith. Please acknowledge receipt by
signing a copy of this letter and returning It to this office:
~ A-2
~A-13
"A G-24
~ J-'i
~ J-1
'~' J-22
~ J-26
"~ K-9
"o Q-7
"~ R-26A
Production Profile 02/09/88 #1 11180-11425 Camco 5"
PITS 01/23/88 #1 8600-9650 Camco 5"
Production Profile 02/04/88 #1 10150-10358 Camco 5"
GR/CCL 01/19/88 #2 8000-9100 Camco 5"
Production Profile 01/19/88 #2 8000-9100 Camco 5"
Production Profile 02/04/88 #1 10150-10524 Camco 5"
Production Profile 01/28/88 #2 10250-10530 Camco 5"
Spinner/Temp -02/09/88 #1 9650-9910 Camco 5"
Production Profile 02/05/88 #1 11800-12100 Camco 5"
Production Profile 01/29/88 #1 9050-9490 Camco 5"
Production Profile 01/22/88 '#1 9500-9900 Camco 5"
Pece Ive
a un, I ol the 0~,9,~1 S)ondord
Victoria Aldridge
I NFORMAT I ON CONTROL
Wel I Records LR2-1
Standard Alaska , ~
Production Company
900 East Benson Boulevard
P.O. Box 196612
Anchorage, Alaska 99519-6612
(907) 561-5111
STANDARD
ALASKA PRODUCTION
February 1, 1988
Alaska Oil & Gas Conservation Commission
3001 Porcupine Drive
Anchorage, Alaska 99501
Attention: Mr. C. V. Chatterton
Well G-24 (11-18-11-14) PBU
Gentlemen:
Enclosed, in duplicate, is Form 10-404, Report of Sundry Well
Operations, for the above-named well. This contains our
subsequent report of perforating the well.
Yours very truly,
JTB: JAM ~
Enclosures (4)
cc: J. L. Haas (MB12-1)
Well Records (LR2-1) w/10
G-24 Well File
r.~\~[l~_. BrBrown, Supervisor
Gravity Drainage
A unit of the original Standard Oil Company
Founded in Cleveland, Ohio, in 1870.
STATE OF ALASKA
ALAbr,,A OIL AND GAS CONSERVATION COMMISSION
REPORT OF SUNDRY WELL OPERATIONS
1. Operations performed: Operation shutdown [] Stimulate [] Plugging []
Alter Casing ~ Other []
2. Name of Operator
STANDARD ~T.ASKA PRODUCTION COMPANY
3. Address
P. O. BOX 196612, ANCHORAGE, ALASKA 99519-6612
4. Location of well at surface
2703' SNL, 1974' WEL, Sec. 12, TllN, R13E, UPM
At top of productive interval
355' SNL, 29' EWL, Sec. 18, TllN, R14E, UPM
At effective depth
818' SNL, 156' EWL, Sec. 18, TllN, R14E, UPM
At total depth
869' SNL, 172' EWL, Sec. 18, TllN, R14E, UPM
11. Present well condition summary
Total depth: measured
true vertical
10475 feet
9146 feetBKB
Plugs (measured)
Perforate ~ Pull tubing
5. Datum elevation (DF or KB)
KBE = 72.06 AMSL Feet
6. Unit or Property name
Prudhoe Bay Unit
7. Well number
G-24 (11-18-11-14) PBU
8. Approval number
7-148
9. APl number
50-- 029-21671
10. Pool
Prudhoe Oil Pool
Effective depth:
measured
true vertical
10397 feet Junk (measured)
9089 feet BKB
12.
Casing Length Size Cemented
Structural --
Conductor 110 ' 20" 9 c.y.
Surface 2657' 13 3/8" 3723 c.f.
Intermediate 9459' 9 5/8" 575 c.f.
Production --
Liner 1266' 7" '383 c.f.
Perforation depth: measured
10242' - 10268'
10284' .- 10332"
true vertical (ss)
8903' - 8970' (tWo intervals)
Tubing (size, grade and measured depth)
4 1/2" L-80 to 9162' with 4 1/2"' tailpipe to 9295'
Packers and SSSV (type and measured depth)
9 5/8" TIW packer at 9162'; 4 1/2" SSSV at 2050'
Stimulation or cement squeeze summary
Intervals treated (measured)
Treatment description including volumes used and final pressure
Measured depth
146'
2693'
9495'
9209'-10475'
True Vertical depth
BKB
146'
2693'
8393'
8169'-9146'
13.
Representative Daily Average Production or Injection Data
Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure
Tubing Pressure
Prior to well operation
N/A
Subsequent to operation
4710 3142 60 932
291
14. Attachments
Daily Report of Well Operations
Copies of Logs and Surveys Run [2;
15. I hereby certify that the foregoing is true and correct to the best of my knowledge
Signed [~.. ~ ~ ,;~i,¢vk,_ Title Supervisor Gravity Drainage
Form 10-404'~ev.~ 12-1-85
Date 2 / i /¢~
Submit in Duplicate
Well G-24 (11r18-11-14) PBU
Initial Perforating 0perations
12/5/87
12/6/87
12/7/87
12/8/87
12/16/87
1/3/88
Pressure tested tubing and.inner annulus.
Installed and tested lubricator to 3500 psi for all
well work. Rigged up Schlumberger and perforated the
following interval for initial production using 3 3/8"
Hyperjet II carrier guns at 4 spf:
10284' - 10332' MD BKB (8934' - 8970' TVDss)
Attempted to put well on production; would not flow.
Shut in well to prepare for initial static survey.
Ran initial static pressure survey at 8800' TVDss.
Reperforated the interval 10285' - 10332' and attempted
to put on production; no flow.
Rigged up Schlumberger and perforated the following
interval using 3 3/8" Hyperjet II carrier guns at 4 spf:
10242' - 10268' MD BKB (8903' - 8922' TVDss)
Put well on production and tested.
jam
1/27/88
0800Z
Slondo~,d Alo~,~o
P O ~. 196612
An(ho, age. Alaska 99519-6612
INDEXED
DALLAS
ARCO
CHEVRON
EXXON
TEXACO Date: 01/07/88
lO: MOBIL TI: 78403
PHILLIPS
STATE OF A~ASKA
GEOSCIENCES
STANDARD
ALASKA P~ODUCTIOINI
REFERENCE:
SAPC CASED HOLE FINAL LOGS
The following material Is being submitted herewith. Please acknowledge receipt by
signing a copy of this letter end returning it to this office:
~ A-33
'~ I)-4A
"~ I)-4A
E-24
'~ E-23
vG-16
~ G-24
Spinner/Temp/Gradio 01/02/88 #2 3510-11370 Sch 5"
Perf Record 01/02/88 #1 10290-10710 Sch 5"
CBT 01/02/88 #1 6963-10753 Sch 5"
CBT 12/31/87 #1 9594-10678 Sch 5"
CBT 12/31/87 #1 10480-11638 Sch 5"
Tubing Puncher Record 01/03/88 #1 8603-8855 Sch 5"
Perf. Record 01/03/87 #3 10150-10367 Sch 5"
Rece i ved ~ ~
Date ~~,.-2 Oil & Gas Cons. Colnmlssi0l~
Anch0rag~
un,t o~r she o,,g.nol ~,toe, do,d ~1 Com~y
f~ed ,n Cle.elond. ~. ,n 1870
Victoria Aldridge
I NFORMAT ~ ON CONTRO~
We I I Records LR2-1
Standard Ala,ka
P,oductlon Company
PO Bo. 19661~
An( ho~ age. Alack o 995 19.6612
1907t 564-511 I
INDEXED
DALI.AS
ARCO
CHEVRON
E,'C<ON
TEXACO Dote: 12/30/87
TO: MOBIL T#: 78363
PHILLIPS
STATE OF ALASKA
GEOSC IENCES
STANDARD
ALASK/~ PRODUCTION
REFERENCE:
SAPC CASED HOLE FINAL LOGS
B-13
B-13
D-4
D-4
E-29
F-4
GC-2B
G-24
G-24
G-24
H-3
H-5
K-11
N-10
R-26A
The following material Is being submitted herewith. Please acknowledge receipt by
signing a copy of this letter and returning It to this office:
Fullbore Spinner
Packer Setting Record
Tubing Puncher
Perf. Squeeze Record
Perf. Record
Production Profile
12/09/87 gl
12/06/87 gI
12/05/87 gl
12/11/87 gl
12/15/.87 gl
12/06/87 gl
Plug Setting & Tubing Puncher Record
Completion Record
HP'Gradient Survey
Perf. Record
Multi-finger Caliper
GR Positioning Log
CBT
Perf. Record
Production (Spinner/Temp)
12/06/87
12/08/87
12/16/87
12/19/87
12/11/87
12/18/87
12/12/87
12/20/87
#i
#t
#2
ltl
#3
#1
g2
Itl
10400-10833 Sch 5"
10555-10520 Sch 5"
9550-10040 Sch 5"
8134-10148 Sch 5"
10900-12504 Sch 5"
10050-10530' Sch 5"
12/17/87 #1 2589-2815
8787-10365 Sch 5"
0-10106 Sch 5"
9400-10370 Sch 5"
8300-10042 Sch 5"
11088-11548 Sch 5"
10450-11626 Sch 5"
10100~10500 Sch 5"
9050-9310 Sch 5"
Sch 5"
Dote ~laska 0il & Gas Cons. Commissi0R ~cfiomge
A unit of the o,g;nol ~tondo~d ~l Co.~pony
founded tn Cleveland. ~,o. ,n 1870
Victoria Aldridge
INFOR~b~I]ON CONIROL
Well Records LR2-I
Standard Alaska
Production Company
900 Eosl 8en~on Boulevord
P.O. Box 196612
Anchoroge. Alosl~o 99.519-6612
(9071 .564.511 I
INDEXED
DALLAS
· ARCO
CHEVRON
E,v~XON
TEXACO
MOBIL
PHILLIPS
STATE OF ALASKA
STANDARD
AI. ASP.'.,P-, PRC.bDUC lION
Date: 07/31/87
TO: TI: 78088
GEOSC IENCES
REFERENCE:
SAPC CASED HOLE FINAL LOGS
The following ma?erlal is being subml??ed herewlfh. Please acknowledge receip? by
signing a copy of ?his lef?er and re?urnlng i? to ?his office:
'" B-13
--- C-23
- D-5
~-- D-26
'-- G-24
--- H-5
"~ K-3
-- M-28
~----- N-7
~ U-5i
Temp. 07/20/87 #1 10500-10924 Camco 5"
Temp. 07/20/87 #1 Surf'3150 Camco 2"
Prod. Profile 07/01/87 #1 10250-10650 Camco 5"
Prod. Profile 07/06/87 #1 10550-10880 Camco 5"
Temp. 07/12/87 #1 Surf-3000 Camco 5"
Temp. 07/14/87 #1 0-3000 Camco 5"
Temp. 07/21/87 #1 Surf-2057 Camco 5"
Injection Profile 06/30/87 #1. 8600-8975 Camco 5"
Perf. Record 07/26/87 #2 10100-10563 Sch 5"
Spinner 07/14/87 #1 9850-10350 Camco 5"
Injection Profile 07/16/87 #1 9150-9534 Camco 5"
Received
Date
A u,~,l of the or,g,nal
Founded ,n Cle,,eland. O~,o. ,n 1870
Victoria Aldridge
INFORMATION CONTROL
Well Records hR2-1
P,oduclion Comp
900 E(,st Be.son Ek J
P.O. Box 196612
An( horace. Aloe, ko 995 19-66 12
(907! 564.511 I
TO:
DALLAS
ARCO
CHEVRON
EXXON
TEXACO
MOBIL
PHILLIPS
STATE OF ALASKA
GEOSC IENCES
INDEXED
STANDARD
ALASKA PRODUC'I-ION
Date: 04/29/87
TI:. 77853
REFERENCE:
SAPC CASED HOLE FINAL LOGS
The following material Is being submitted herewith. Please acknowledge receipt by
slgnlng a copy of this letter and returning it to this office=
F-18 Pert.Record 01/05/87 #1 11693-1 2313 Sch 5"
H-17 Cc~ le tion Record 12/20/86 #2 10258-10804 Sch 5"
J-2 Perf. Record 01/05/87 #2 10000-10278 Sch 5"
M-28 Co~letion Record 12/05/86 #1 8000-9194 Sch 5"
S-6 Perf. Record 12/23/86 #3 10200-10615 Sch 5"
Y-24 Perf. Record 01/01/87 #2 12700-13451 Sch 5"
G-24 CBT 01/23/87 #1 9060-10392 Sch 5"
G-24 CET 01/23/87 #1 9060-10398 Sch 5"
G-24 GCT 01/23/87 #1 0-10350 Sch 5"
G-29 CET 10/15/86 #1 8920-10076 Sch 5"
k
Date / /AlaSka Oil & GaS Cons. Commission
I NF
ORMA
T
ION
CON
TROL
_ / ..... ~,~h~rnrlP, We I I Records LR2- I
Founded m C~~~ t810
Standard Alaska ....
Production Compa
900 East Benson Bou. .~rd
P.O. Box 196612
Anchorage, Alaska 99519-66]2
(907~ 561-51 ll
STANDARD
ALASKA PRODUCTION
~mrch 6, 19 8 7
Alaska Oil & Gas Conservation Commission
3001 Porcupine Drive
Anchorage, Alaska 99501
Attention: Mr. C. V. Chatterton
Well G-24 (11-18-11-14) PBU
Gentlemen:
Enclosed, in triplicate, is Form 10-403, Application for Sundry
Approvals, for the above-named well. This contains our
proposal to perforate the well.
PFB: JAM~
Enclosures (9)
cc: J. L. Haas (~B12-1)
G-24 Well File
Yours very truly,
/,
P. F. Barth, Supervisor
Reservoir/Production
Surveillance Unit I
A unit of the anginal Standard Oil Company
Founded in Cleveland Ohio ,n 1870
~'- STATE OF ALASKA
ALAS, OIL AND GAS CONSERVATION COMM,,_,SION
APPLICATION FOR SUNDRY APPROVALS
1. Type of Request: Abandon - Suspend -- Operation Shutdown :' Re-enter suspended well ' Alter casing
Time extension -- Change approved program - Plugging ~- Stimulate .... Pull tubing ' Amend order" Perforate iX Other
2. Name of Operator
STANDARF) Al ASKA PRODUCTION COMPANY
3. Address
P. O. BOX 1966122 ANCHORAGEs ALASKA 99519-6612
4, Location of well at suFface
2703' SNL, 1974' WEL, Sec. 12, T11N, R13E, UPM
At top of productive interval
355' SNL, 29' EW.L, Sec. 18, TllN, R14E, UPM
At effective depth
818' SNL, 156' EWL, Sec. 18, T11N, R14E, UPM
At total depth
869' SNL, 172' EWL, Sec. 18, T11N, R14E, UPM
11. Present well condition summary
Total depth:
measured 10475 feet Plugs (measured)
true vertical 9146 feet BKB
5. Datum elevation (DF or KB)
KBE = 72.06 feet
6. Unit or Property name
Prudhoe Da.y,, Unit
7. Well number
G-24 (11-18-11-14) PBU
8. Permit number
86-183
9. APl number
50-029-21671
10. Pool
Pr'udhoe 0il Pool
Effective depth: measured 10397 feet Junk (measured)
true vertical 9089 feet BKB
Casing Length Size Cemented Measured depth
Structural --
Conductor. 74' 20" 9 cu.yds. 110'
Surface 2657' 13 3/8" 3723 c.f. 2693'
Intermediate 9459' 9 5/8" 575 c.f. 9495'
Production --
Liner 1266' 7" 383 c.f. 9209-10475'
Perforation depth: measured
True Vertical depth
BKB
110'
2693'
8393'
8169-9146'
true vertical
Tubing (size, grade and measured depth)
4 1/2" L-80 to 9162' with 4 1/2" tai]pipe to 9295'
Packers and SSS¥ (type and measured depth)
9 5/8" TIW packer' at. 9162'; 4 1/2" BVN at 2050'
--
12.Attachments Description summary of proposal '~ Detailed operations program i ....
BOP sketch
13. Estimated date for commencing operation
March 1987
14. If proposal was verbally approved
Name of approver
Date approved
1,5. I hereby ccrtify,..~that the forc, g'oing is true and correct to the best of my knowledge
Sig'~eed /(' ~ ,/~~-'~' TitleSupvr. Res/Prod. Surveillance I
P. F ' Barth
Conditions of approval
Approved by ,~:i! ii..,~,;~:,~,~
Form 10-403 Rev 12-1-85
Date
Commission Use Only
Notify commission so representative may witness
~ Plug integrity _%: BOP Test ~ Location clearance[ Approval No.
~: "' - :::~'~ommissioner the comm ssion Date
Submit in triplicate
Well G-24 (11-18-11-14) PBU
INITIAL'PERFORATING PROPOSAL
We propose to perforate the following intervals for initial pro-
duction during March 1987 at 4 spf:
10242' - 10268' MD BKB (8903' -8922' TVDss)
10284' - 10332' MD BKB (8934' -8970' TVDss)
All depths are referenced to BHCS/GR, 12/16/86.
A lubricator will be installed and tested to 3500 psi for all well
work.
The lower interval (10284' - 10332') will be perforated and tested
followed by a mud acid stimulation of that interval; then the upper
interval (10242' - 10268') perforated.
Following perforating operations, a SSSV will be set and tested in
the ball valve nipple at 2050'.
jm
3/6/87
BOWEN
PACKOFF
FLOW TUBES
& PACKOFF
~-'- HAND
~ GREASE SEAL
FLOWTUBE
PUMP
FLOWLINE ~
GREASE LINE
F LOWLI N E
VALVE
RISER
GREASE
L
' MANIFOLD
. ~/~GREASE
PUMP
...,-GREASE
RESERVOIR
BOP
Original Well Completion Report ±-±b-~/
.... STALE OF ALASKA Amer, ~rC-~ Well Completion Report 2-4-87
ALASKA L AND GAS CONSERVATION CL .MISSION (~
WELL COMPLETION OR RECOMPLETION REPORT AND LOG
1. Status of Well Classification of Service Well
OIL [] GAS [] SUSPENDED [] ABANDONED [] SERVICE []
2. Name of Operator 7. Permit Number
Standard Alaska Production Company 86-183
3. Address 8. APl Number
P.O. Box 196612, Anchorage, Alaska 99519-6612 50- 029-21671
4. Location of well at surface 9. Unit or Lease Name
2703' SNL, 1974' WEL, Sec. 12, TllN, R13E [OCA'r!O~,L~i Prudhoe Bay Unit
At Top Producing Interval I V[:i~il;,i~j:) i 10. Well Number
.
S u r f , .~___~ .
355' SNL, 5251' WEL, Sec. .18, TllN, R14E~ G-24 (11-18-11-14)
At Total Depth JIB. H,~ 11.Field and Pool
869' SNL, 5108' WEL, Sec. 18, TllN, R14E
5. Elevation in feet (indicate KB, DF, etc.) 6. Lease Designation and Serial No. Prudhoe Bay Field
KBE = 72.06' APL 28305 Prudhoe Bay Pool
12. Date Spudded 13. DateT.D. Reached 14. Date Comp.,Susp. orAband. I 15. Water Depth, if offshore 116' No. of Completions
12-6-86 12-16-86 12-21-86I N/A feet MSLt One
17. Total Depth (MD+TVD) 18.Plug Back Depth (MD+TVD) 19. Directional Survey 20. Depth where SSSV set I 21. Thickness of Permafrost
10475'MD 9i46'TVD 10397'MD 9089'TVD YES [] NO [] 2050 feetMDI 2025'
22. Type Electric or Other Logs Run
DIL/SFL, BHCS, CNL/GR-poro
23. CASING, LINER AND CEMENTING RECORD
SETTING DEPTH MD
CASING SIZE WT. PER FT. GRADE TOP BOTTOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED
20" CondtLctor Surface 110' i9 cu. yds. concrete
13-3/8" 72~ L-80 Surface 2003' 17-1/2" 3258 cu. ft. Permafro.,;t "E" followed b%
13-3/8" 72~ S-95 2003' 2693' 17-1/2" 465 cu. ft. Per~afrost
9-5/8" 47~ L-80NSCC Surface 4407' 12-1/4"
9-5/8" 47~ L-80Butt 4007' 9495' 12-1/4" i575 cu. ft. Class G 1;~CFR-2 .1 HR-7
~7" 26# T~,4'S 9209' 1047~~- 8-1/2" 383 cu.ft. Class G 0~5% Halad 344+LWL
interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD)
4-1/2" 12.6# 9296 'MD 9'174 'MD
L-80
26. ACID, FRACTURE, CEMENT SQUEEZE, ETC.
DEPTH INTERVAL (MD) AMOUNT& KIND OF MATERIAL USED
9-5/8"x13-3/8" Annulus displaced with 167
bbls diesel & shut in w/625
Annulus
27. PRODUCTION TEST
Date First Production I Method of Operation (Flowing, gas lift, etc.)
I
Date of Test Hours Tested PRODUCTION FOR OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE IGAS-OILRATIO
TEST PERIOD II~
I
Flow Tubing Casing Pressure CALCULATED , OIL-BBL GAs-MCF WATER-BBL OIL GRAVITY-APl (co[r)
Press. 24_HOUR RATE I~
28. CORE DATA
Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips.
RECEIVED
0 6 1987
Alaska Oil & Gas Cons. Commission
Anchorage
Form 10-407 Submit in duplicate
Rev. 7-1-80 CONTINUED ON REVERSE SIDE
29.
Sag
NAME
Shublik A
GEOLOGIC MARKERS
Zone 4
(Top Ivishak/S
MEAS. DEPTH
9509'
9554'
9647
TRUE VERT. DEPTH
8404'
8440'
8514'
30.
dlerochit)
FORMATION TESTS
Include interval tested, pressure data, all fluids recovered and gravity,
GOR, and time of each phase.
31. LIST OF ATTACHMENTS
32.
I hereby certify that the foregoing is true and correct to the best of my knowledge
Division
Drilling
Signed ~- %' ~ Title mnqineer
Dale
INSTRUCTIONS
General: This form is designed for submitting a complete and correct well completion report and log on
all types of lands and leases in Alaska.
Item 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt
water disposal, water supply for injection, observation, injection for in-situ combustion.
Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements
given in other spaces on this form and in any attachments.
Item 16 and 24: If this well is completed for separate production from more than one interval (multiple
completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported
in item 27. Submit a separate form for each additional interval to be separately produced, showing the
data pertinent to such interval.
Item 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.).
Item 23: Attached supplemental records for this well should show the details of any multiple stage cement-
ing and the location of the cementing tool.
Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In-
jection, Gas Injection, Shut-in, Other-explain.
Item 28: If no cores taken, indicate "none".
Form 10-407
Standard Ala siva
Produ(t Jan Company
900 Eost Bt;nsom Bo,~lu .....
PO Box 1966!2
Anchorage, ,Alaska 99519-6612
!907~ 561 5111
STANDARD
AI..A..%KA PRODI. JCTION
January 14, 1987
Alaska Oil and Gas Conservation Commission
3001 Porcupine Drive
Anchorage, Alaska 99501
Attention: Mr. C. V. Chatterton
Well G-24 (11-18-11-14) PBU
Gentlemen:
Enclosed in duplicate is Form 10-407, Well Completion Report, for the
above-named well, together with the Daily Drilling Reports and
Directional Survey.
The Gyroscopic Directional Survey has not been completed due to the
current drilling rig location. An Amended Well Completion Report will be
submitted at a later date along with the gyroscopic survey. Items #4,
#17, #18 and #29 will also be completed.
This well has been completed as a non-perforated oil well.
Very truly yours,
STANDARD ALASKA PRODUCTION COMPANY
RSA/MAW/pm/1453D
Enclosure
cc: Well File #17
J. A. Martin
R. S. Allan
Division Drilling Engineer
Standard Alaska · ....
Production Company
900 Fast Benson Boulev< ~ ~
P.O. Box 196612
Anchorage, Alaska 99519-6612
/907) 561-5111
STANDARD
ALASKA PRODUCTION
January 14, 1987
Alaska Oil and Gas Conservation Commission
3001 Porcupine Drive
Anchorage, Alaska 99501
Attention: Mr. C. V. Chatterton
Well G-24 (11-18-11-14) PBU
Gentlemen:
Enclosed in duplicate is Form 10-407, Well Completion Report, for the
above-named well, together with the Daily Drilling Reports and
Directional Survey.
The Gyroscopic Directional Survey has not been completed due to the
current drilling rig location. An Amended Well Completion Report will be
submitted at a later date along with the gyroscopic survey. Items #4,
#17, #18 and #29 will also be completed.
This well has been completed as a non-perforated oil well.
Very truly yours,
STANDARD ALASKA PRODUCTION COMPANY
RSA/MAW/pm/1453D
Enclosure
cc: Well File #17
J. A. Martin
R. S. Allan
Division Drilling Engineer
A unit of the original Standard Oil Company
Founded in Cleveland, Ohio, in 1870.
- ~ .... STATE OF ALASKA .....
ALASKA ~-.,L AND GAS CONSERVATION CO ,,MISSION
WELL COMPLETION OR RECOMPLETION REPORT AND LOG
1, Status of Well Classification of Service Well
OIL I~ GAS [] SUSPENDED [] ABANDONED [] SERVICE []
2. Name of Operator 7. Permit Number
Standard Alaska Production Company 86-183
3. Address 8. APl Number
P. O. Box 196612 Anchorage, AK 99519-6612 50-029-21671
4'. Location of well at surface 9. Unit or Lease Name
2703' SNL, 1974' WEL, Sec. 12, TllN, R13E Prudhoe Bay Unit
At Top Producing Interval 10. Well Number
G-24 (11-18-11-14)
At Total Depth 11. Field and Pool
Prudhoe Bay Field
5. Elevation in feet (indicate KB, DF, etc.) 6. Lease Designation and Serial No. Prudhoe Bay Pool
KBE = 72.06' ADL 28305
,
12. Date Spudded 13. Date T.D. Reached 14. Date Comp,, Susp. or Aband. 15. Water Depth, if offshore 16. No. of Completions
12-6-86 12 -,16-86 12 -21-86 N/A feet MSL One
17. Total Depth (MD+TVD} 18. Plug Back Depth (MD+TVD) 19. Directional Survey 1 20. Depth where SSSV set 21. Thickness of Permafrost
10473' MD 10397'MD YES [] NO []I 2050 feet MD 2025 '
22. Type Electric or Other Logs Run
DIL/SFL, BHCS, CNL/GR-poro
23. CASING, LINER AND CEMENTING RECORD
SETTING DEPTH MD
CASING SIZE WT. PER FT. GRADE TOP BOTTOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED
20" Conc~uctor Surface 110' 9 ~u.vds concrete
-
13-3/8" 72# L-80 Surface 2003" 17%" 3258 cu.ft. Permafro: t "E" followed b~
-,
13-3/8" 72# S-95 2003' 2693' 17%" 465 cu.ft. Perma: rost
9-5/8" 47# L-80NSCC :Surface 4407' 12%"
9-5/8" 47# L-80Butt 440.7' 9495' 12~" 575 cu,ft. Class G 1 ~CFR2 .1 HR-7
7" 26# TC4S. 9209~' 10473' . 8~" 383 cu.ft, Class G 0.5% Halad 344 +LWI
SIZE DEPTH SET (MD) PACKER SET (MD)
4%" 12.6# 9296 'MD 9] 74'MD
L-80
26. ACID, FRACTURE, CEMENT SQUEEZE, ETC.
DEPTH INTERVAL (MD) AMOUNT& KIND OF MATERIAL USED
9--5/8"x13-3/8" Annulus displaced with 167bbl
diesel & shut in w/ 625psi
27. PRODUCTION TEST
Date First Production Method of Operation (Flowing, gas lift, etc.)
,,
Date of Test Hours Tested PRODUCTION FOR OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE GAS-OIL RATIO
TEST PERIOD ~
Flow Tubing , Casing Pressure CALCULATED~1~ OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-APl (corr)
Press. 24-HOUR RATE ~
28. CORE DATA
Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips.
j ix... i",:, 1 ~'-:;, .(.' ::!::
~i3st~a (Iii & Gas Cons. 60mmissi0r~
Anchorage
Form 10-407 Submit in duplicate
Rev. 7-1-80 CONTINUED ON REVERSE SIDE
29. 30.
GEOLOG'ICMARKERS FORMATION TESTS
NAME Include interval tested, pressure data, all fluids recovered and gravity,
MEAS. DEPTH TRUE VERT. DEPTH GOR,and time of each phase.
R, CE!V[D
31. LIST OF ATTACHMENTS
32. I hereby certify that the foregoing is true and correct to the best of my kn2wle~e .
DlVl S ion
Drilling
S~gned '~' ~ ' ~ Title End,near ~ate
INSTRUCTIONS
General: This form is designed for submitting a complete and correct well completion report and log on
all types of lands and leases in Alaska.
Item 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt
water disposal, water supply for injection, observation, injection for in-situ combustion.
Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements
given in other spaces on this form and in any attachments.
Item 16 and 24: If this well is completed for separate production from more than one interval (multiple
completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported
in item 27. Submit a separate form for each additional interval to be separately produced, showing the
data pertinent to such interval.
Item 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.).
Item 23: Attached supplemental records for this well should show the details of any multiple stage cement-
ing and the location of the cementing tool.
Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In-
jection, Gas Injection, Shut-in, Other-explain.
Item 28: If no cores taken, indicate "none".
Form 10-407
SAPC Daily. Drilling Report -- PBU
December 5, 1986 at 0600 hours
Rig: AUDI #2
Well- G-24 (Il-18-11-14)
AFE # 120526
0600 Depth' '
Day- -1
24-Hour Ftg' 500'
Water Used'
Current Operation' Mix Spud mud.
Accept rig at 0300 hrs. 12/05/86. Rigging up.
MUD TYPE-Spud WT' VIS' PV' YP' FL' SOLIDS'. TEMP:°F'
SURVEY MD ANGLE DIRECTION TVD SECTION
COORDINATES
DLS
1 401 h'
SAP£ Dai}¥ nrillina Repnrt -- PDII
December 6, 1986 at 0600 hours
Rig' AUDI #2
Well· G-24 f11-18-11-14)
0600 Depth- 1674'
Pay' ~
24-Hour ~tg' 1674'
Water Used- 2100
Current Operation' RIH w/Bit #3.
Spud G-24 at 0800 hrs. 12/05/86. Drill to 731'. Trip for bit.
Drill and Gyro survey to 1674'. PON.
MUD TYPE-SPUD WT'9.8 VIS-210 PV-20 56 14.4 10 70 YP- FL' SOLIDS- TEMP-°F
'SURVEY MD ANGI_E DIRECTION TVD SECTION COORDINATES DLS
1401 h'
SAPC Daily Drilling Report -- PBU
December 7, 1986 at 0600 hours
Ria: AUDI #2
Well- G-24 (11-18-11-14)
AFE # 120526
0600 Depth' 2710'
Day' 2
24-Hour Fta' !036'
Water Used' 900
Current Operation' Nipple up B.O.P.
Drill and gyro survey to 2710' Short trip. CBU. POH Ran 13-3/8"
casing to 2692' and cement wit~ 1654 sks Permafrost E followed by 500
sks Permafrost. NU BOPE.
MUD TYPE-SPUD WT:9.6 VIS'200 PV-16 YP'48 FL'14.2 SOLIDS'9.5 TEMP'71°F
SURVEY-'-~ MD ANGLE DIRECTION TVD SECTION COORDINATES DLS
,,
1401 h'
SAPC Dail.v F)rillina Peport -- PBU
December 8, 1986 at 0600 hours
Rig: AUDI #2
Well' G-24 ell-18-11-14)
AFE # 120526
0600 Depth' 4040'
Pay' 3
24-Hour Ftg' 1330'
Water Used' 1600
Current Operation: Jet Drilling.
Test BOPE. RIH and drill cement and plugs to FC. Test casing to
3000 psi. Drill FS and new hole to 2715'. Ran FIT to .7 psi/ft.
Drilling at 4040'.
MUD TYPE-DISP WT:9.1 VIS-32 PV-3 YP:4 FL-13.2 SOLIDS:6 TEMP-71 °F
SURVE~ MD ANGLE DIRECTION TVD SECTION COORDINATES DLS
7 2971 5.3 S49E 2971 18 10 1 5 1 . 6
8 31 54 8.5 S50.1E 3152 39 25 32 1 . 8
9 3342 12.2 S49.4E 3337 71 47 58 1 . 8
10 3528 18.3 S46.8E 3516 119 80 94 3.3
11 3712 23.0 S47.6E 3689 183 125 141 2.6
12 3898 28.9 S46.9E 3856 267 180 201 3.2
SAPC Dai 1.~/ Drill i ng Report -- PBU
December 9, 1986 at 0600 hours
Rig' AUDI #2
Well' G-24 ~ll-18-11-14)
AFE # 120526
0600 Depth- 5614'
Day' 4
24-Hour Ftg' 1574'
Water Used: 1700
Current Operat.ion- RIH w/Bit #6.
Drill to 4104'. Trip for bit and BHA. Drill to 5614'. Trip for bit.
MUD TYPE-DISP WT:9.7 VIS'36 PV'9 YP-6 FL'lO.8 SOLIDS'lO TEMP:74°F
SURVEY MD ANGLE DIRECTION TVD SECTION
13 4084 34.3 S42E 4014 358
14 4540 34.8 S44.8E 4390 614
15 4726 35 S42.3E 4542 71 9
16 5196 36 S45.5E 4925 988
17 5571 37 S44.8E 5226 1208
COORDINATES DLS
250 269
438 447
515 520
71 1 709
870 865
1401 h-
SAPC Dail,'¥ Drilling Report -- PBIJ
December 10, 1986 at 0~00 hours
Rig' AUDI #2
Well' G-24 {11-18-11-14)
AFE # 120526
Current Operat, ion- Drilling.
Drill to 6281'.
0600 Depth' 6870'
Day' 5
24-Hour Ftg' 1256'
Water Used' 500
Trip for bit. F)rilling at 6870'.
MUD TYPE-DISP WT:9.7 vIS'34 PV:8 YP'4 FL'6.6 SOLIDS'lO.2 TEMP'77°F
,SURVEY MD ANGLE DIRECTION TVD SECTION COORDINATES
18 5760 37.2 S44,8E 5377 1320 952 946
19 6237 37 S44,1E 5757 1603 1157 1147
20 6701 36.1 S43,7E 6130 1876 1356 1338
DLS
1401 h'
Rtg: AUDI #2
Well: G-24 (11-18-11-14)
SAPC Oatly, Drt111ng Report -- PBU
December 11, 1986 at 0600 hours
·
AFE # 120526
0600 Depth: 7685'
Day: 6
24-Hour Ftg' 815'
Water Used: 300
Current Operation- Trip.
Drill to 6888'. Trip for bit. Drill to 7685'. Trip for bit and BNA.
MUD TYPE-DISP WT:9.7 VIS:35 PV:9 YP-5 FL:6.6 SOLIDS:iO.5 T£MP:76°F
SURVEY MD ANGLE DIRECTION TVD SECTION COORDINATES DLS
21 7172 34 S43.4E 6517 2141 1551 1523
22 7548 32 S42E 6832 2344 1702 1662
1401 h'
Rig- AUDI #2
Well' G-24 Il1-18-11-14)
SAPC Dai1% Drilling Report -- PBU
December 12, 1986 at 0600 hours
AFE # 120526
0600 Depth' 8630'
Day' 7
24-Hour Ftg' 945'
Water Used' 300
Current Operation' Drilling.
Orient and drill 7685 to 7872'. Trip for bit and BHA. Ream motor
run. Drilling at 8630'.
MUD TYPE-DiSP WT:9.9 VIS'37 PV-7 YP-6 FL-7.6 SOLIPS'll.7 TEMP'80°F
SURVEY MD ANGLE DIRECTION TVD SECTION COORDINATES DLS
23 7787 34.9 S29.7E 7032 2475 1809 1739
24 8108 36.2 S22E 7293 2660 1976 1820
25 8468 36.4 S18.8E 7584 2866 2176 1894
1 401 h'
Rig: AUDI //2
~ell: G-24 (11-18-11'14)
SAPC Daily, Dri 11 i ng Report -- PBU
December 13, 1986 at 0600 hours
AFE # 120526
0600 Depth: 9100'
Day: 8
24-Hour Ftg: 470'
Water Used: 200
Current Operation: Drilling.
Trip for bit. Ream 8562' to 8630'. Drilling at 9100'.
MUD TYPE-DISP WT:9.9 VIS'35 PV'll YP:6 FL'7.4 SOLIDS'll.5 TEMP'°F
,SURVEY MD ANGLE DIRECTION TVD SECTION COORDINATES
26 8743 38.2 S17.7E 7802 3026 2334 1946
DLS
1401 h'
Rig: AUDI #2
Well: G-24 {11-18-11-14)
SAPC Dai 1.~ Dri 11 i ng Report -- PBU
December 14, 1986 at 0600 hours
AFE # 120526
0600 Depth: 9500'
Day' 9
24-Hour Ftg' 400'
Water Used' 300
Current Operation- Running 9-5/8" casing.
Drill to 9500'. Short trip. CBU. POH. Running 9-5/8" casing.
MUD TYPE-DISP WT:9.8 VIS:38 PV'12 YP'll FL'6.4 SOLIDS'Il.3 TEMP'°F
SURVEY MD ANGLE DIRECTION TVD SECTION COORDINATES
--
27 9031 38.8 S15.3E 8025 3199 2507 2000
28 9436 38.1 SIO. 7E 8343 3434 2753 2057
DLS
1401 h'
Rig: AUDI #2
Nell' G-24 (11-18-11-14)
SAPC Daily. Drilling Report -- PBU
Pecember 15, 1986 at 0600 hours
AFE # 120526
0600 Depth' 9595'
l~ay- 10
24-Hour Ftg' 75'
Water Used- 400
Current Operation: Drilling.
Ran 9-5/8" casing to g495' and cemented with 500 sks Class G.
Installed and tested packoff. Test BOPE. RIH and drill cement to
FC. Test casing to 3000 psi. Drilling 8-1/2, hole at 9595'.
MUD TYPE-DISP WT-9.0 VIS'32 PV-4 YP-3 FL'14.2 SOLIDS'7 TEMP:°F
SURVEY- MD ANGLE DIRECTION TVD SECTION
COORDINATES DLS
1401h-
SAPC Paily Drilling Report -- PBU
December 16, 1986 at 0600 hours
Rig: AUDI #2
Well: G-24 (Il-18-11-14)
AF£ # 170526
0600 Depth: 10,465'
Day: ll
24-Hour Ftg: 890'
Water Used: 400
Current Operation: Drilling.
Drilling 8-1/2" hole at 10,465'.
MUD TYPE-DISP WT:9.0 VIS:36 PV:8 YP:6 FL:7.6 SOLIDS:5.5 TEMP:90°F
SURVEY MD ANGLE DIRECTION TVD SECTION
COORDINATES DLS
1401h:
SAPC Daily Drilling P. eport -- PBU
December 17, 1986 at 0600 hours
Rig' AUDI #2
Well: G-24 (Il-18-11-14)
AFE # 120526
0600 Depth: 10,475'
Day: 12
24-Hour Ftg: lO'
Water Used: 1500
Current Operation' Run 7" liner.
Drill to 10,475'. Short trip. CBU. POH. Ran open hole logs. Made
wiper trip. RU to run 7" liner.
MUD TYPE-DISP WT:9.1 VIS:36 PV:7 YP:5 FL:7.6 SOLIDS:6 TEMP:90°F
SURVEY MD ANGLE DIRECTION TVD SECTION
COORDINATES DLS
1401h:
SAPC Daily Drilling Report -- PBU
December 18, 1986 at 0600 hours
Rig: AUDI #2
Well: G-24 {Il-18-11-14)
AFE # 120526
0600 Depth: 10,475'
Day: 13
24-Hour Ftg: '
Water Used: 200
Current Operation- Rig repair, inspect derrick.
Ran 7" liner, Rotated and reciprocated while cementing with 325 sks
Class Gl POH 31 stands and hit crown. Inspecting derrickJ
MUD TYPE-DISP WT:9.1 VIS:37 PV:6 YP:4 FL:7.6 SOLIDS:6 TEMP:78°F
SURVEY MD ANGLE DIRECTION TVD SECTION
COORDINATES DLS
· ,
1401 h:
SAPC Daily,Drilling Report -- PBU
December 19, 1986 at 0600 hours
Rig' AIJDI #2
Well' G-24 (Il-18-11-14)
AFE # 120526
0600 Depth' 10,475'
Day' 14
24-Hour Ftg' '
Water Used' 800
Current Operation' RIH w/Bit #13 F/cleanout.
Inspect derrick. POH. RIH and drill cement from 8838 to TOL at
9209'. CBU. POH. RIH w~th 6" bit.
MUD TYPE-DISP WT'8.9 VIS'31 PV'I YP'2 FL' SOLIDS'4 TEMP'°F
SURVEY MD ANGLE DIRECTION TVD SECTION COORDINATES DLS
1401 h'
SAPC Daily Drilling Report -- PBU
December 20, 1986 at 0600 hours
Rig: AUDI #2
Well: G-24 (Il-18-11-14)
AFE # 120526
0600 Depth: 10,397'
Day: 15
24-Hour Ftg: '
Water Used: 2100
Current Operation: Lay down drill pipe.
Clean out cement to landing collar. Test casing to 3000 psi.
Displace with 9.6 ppg NaC1. Test liner to 3000 psi. POH.
MUD TYPE-NaC1 WT:9.6 VIS:26 PV: YP: FL: SOLIDS: TEMP:°F
SURVEY MD ANGLE DIRECTION TVD SECTION COORDINATES DLS
1401 h:
SAPC Daily Drilling Report -- PBU
December 21, 1986 at 0600 hours
Rig' AUDI #2
Well' G-24 (Il-18-11-14)
AFE # 120526
0600 Depth' 10,397'
Day: 16
24-Hour Ftg' '
Water Used' 1200
Current Operation- Clean pits and pump cellar.
Ran 4-1/2" tubing. NU and test tree to 5000 psi. Displace tubing
with diesel. Set and test packer to 3500 psi. Displace annulus with
diesel. Released rig at 0600 hrs. 12/21/86.
MUD TYPE-NaC1 WT-9.6 VIS-26 PV- YP' FL' SOLIDS: TEMP'°F
SURVEY MD ANGLE DIRECTION TVD SECTION COORDINATES DLS
1401 h-
] TELECO1 Teleco Oilfield S, s of Alaska Inc.
6116 Nielson Way
Anchorage, AK
99502
(907) 562-2646
December 15, 1986
JOB # 552
STANDARD ALASKAPRODUCTION CO.
WELL: G-24
PRUDHOE BAY
AUD #2
Please find attached a copy of the computer calculated MWD directional surveys
for the above mentioned well.
We at Teleco appreciate this opportunity to provide service to Standard Alaska
Production Company.
Teleco is committed to providing the highest quality of service and we would
welcome any comments or questions concerning these surveys or any of our other
services.
Sincerely,
Pat Havard
Field Service Supervisor
PH/el
Enclosure$
A ,,~#_~'r COMPANY
Date 12/15/86
TELECO OILFIELD SERVICES
JOB 552 SURVEY CALCULATIONS
Page
Company: SAPC
Well: G-24
Location: PRUDHOE BAY
Rig: AUD #2
T ,~-~CO Job #. TAK 552
G ~, Correction:
Magnetic Declination:
Total Correction:
Proposed Direction:
0.00 degrees
31.50 degrees
31.50 degrees
145.47 degrees
RADIUS OF CURVATURE CALCULATION
MEAS
DEPTH INCL
feet deg
DIRECTION TRUE VERTICAL COORDINATES CLOSURE DOG LEG
AZIMUTH BEARING VERT DEPTH SECTION N/S E/W DIST ANGLE SEVERITY
deg deg/min feet feet feet feet feet deg deg/100'
1( .00
TIE-IN
~0~.,~ 0i~ [7~,,~0,. N 71 00 E 1659.00
0.00 0.00N 0.00E 0.00 N 90.000E 0.000
2186.00 0.5 71.0 N 71 00 E 2185.99
0.61 0.74N 2.17E 2.29 N 71.057E 0.095
2675.00 0.5 166.0 S 14 00 E 2674.97
3.99 1.06S 5.50E 5.60 S 79.052E 0.151
2971.00 5.3 131.0 S 49 00 E 2970.50
18.71 13.63S 13.20E 18.98 S 44.094E 1.655
~3154.00 8.5 129.9 S 50 06 E 3152.16
39.94 27.89S 29.93E 40.91 S 47.022E 1.750
3342.00 12.2 130.6 S 49 24 E 3337.06 72.53 49.71S 55.71E 74.66 S 48.255E 1.969
TELECO Job # TAK 552 12/15/86 Page 2
MEAS DIRECTION TRUE VERTICAL COORDINATES CLOSURE DOG LEG
DEPTH INCL AZIMUTH BEARING VERT DEPTH SECTION N/S E/W DIST ANGLE SEVERITY
feet deg deg deg/min feet feet feet feet feet deg deg/100'
****************************************************************************************************
3528.00 18.3 134.2 S 45 48 E 3516,43 120.16 82.68S 91.81E 123.55 S 47.996E 3.317
3712.00 23.0 132.4 S 47 36 E 3688.56 183.57 127.17S 139.02E 188.41 S 47.550E 2.577
3~98.00 28.9 133.1 S 46 54 E 3855.73 262.92 182.39S 198.76E 269.76 S 47.459E 3,176
4084.00 34.3 138.0 S 42 00 E 4014.10 358.86 251.92S 266.96E 367.06 S 46.661E 3,213
4540.00 34.8 135.2 S 44 48 E 4389.67 614.35 439.80S 444.63E 625.40 S 45.313E 0.365
4726.00 35.0 137.7 S 42 18 E 4542.22 719.45 516.92S
5196.00 36.0 134.5 S 45 30 E 4924.85 988.70 713.55S
5571.00 37.0 135.2 S 44 48 E 5226.29 1207.93 870.87S
5760.00 37.2 135.2 S 44 48 E 5377.04 1320.12 951.80S
6237.00 37.0 135.9 S 44 06 E 5757.49 1603.54 1157.19S
6701.00
7~,~.00
7548.00
36.1 136.3 S 43 42 E 6130.23 1876.18 1356.30S
34.1 136.6 S 43 24 E 6515.56 2143.63 1552.57S
32.0 138.0 S 42 00 E 6830.70 2346.60 1703.26S
7787.00 34.9 150.3 S 29 42 E 7030.10 2478.03 1809.83S
8108.00 36.2 158.0 S 22 00 E 7291.26 2662.39 1977.66S
8468.00
8743.00
38.2 162.3 S 17 42 E
·
7581.40 2869,03 2177.39S
7800.14 3028.99 2335.64S
517.95E 731.77 S 45.057E 0.777
707.17E 1004.62 S 44.743E 0.449
865.31E 1227.67 S 44.817E 0,289
945.60E 1341.67 S 44.813E 0.109
1147.08E 1629.39
1338.68E 1905.68
1525.27E 2176.45
1664.32E 2381.40
1741.32E 2511.51
1822.63E 2689.45
1896.91E 2887.78
1949.09E 3042.07
S 44.749E 0.098
S 44,626E 0.201
S 44,492E 0,426
S 44,337E 0.594
S 43,895E 3.080
S 42,664E 1.451
S 41.062E 0.529
S 39.845E 0.698
TELECO Job # TAK 552 12/15/86 Page 3
MEAS DIRECTION TRUE VERTICAL COORDINATES CLOSURE DOG LEG
DEPTH INCL AZIMUTH BEARING VERT DEPTH SECTION N/S E/W DIST ANGLE SEVERITY
feet deg deg deg/min feet feet feet feet feet deg deg/100 '
****************************************************************************************************
9031.00 38.8 164.7 S 15 18 E 8025.53 3199.45 2507.53S 2000.00E 3207.45 S 38.576E 0.559
9436.00 38.1 169.3 S 10 42 E 8342.71 3433.66 2752.85S 2056.64E 3436.27 S 36.763E 0.727
TLzECO Oii~imld Sarvicas
VERT ~ CAL PROJECT ION
0
1000
2000
3000
4000
5000
6000
7000
8O00
gO00
10000
1000 2000 3000 4000 5000 6000
VERTICAL SECTION (?t)
TELECO 0 i i ~ i a i d
PLAN VIEW
Sarvicas
400
400
800
200
-!-
I-
0
co 1600
2000
2400
2800
3200
0 400 800 1200 1600 2000 2400
EAST (~t)
GREAT LAND DIRECTIONAL DRILLING INC.
REPORT OF SUB-SURFACE DIRECTIONAL SURVEY
STANDARD ALASKA PRODUCTION COMPANY
COMPANY
O-PAD WELL #24
WELL NA~E
PRUDHOE BAY
I_[)CA'F ION
AL12-86-D42
MWD & SS
12-17-86.
JOB NUMBER TYF'E SURVEY DATE
NAME T I TLE S I GNATURE
1659 FT 9436 FT
DEPTH INTERVAL
'FROM TO
12-3-86
DATE SURVEY TAKEN FROM
12-14-86
TO
THIS IS A RECORD OF A SUB-SURFACE SURVEY OF YOUR WELL
WE HAVE RETAINED A COPY OF YOUR SURVEY REPORT IN OUR
FILES FOR YOUR CONVENIENCE; HOWEVER, SHOULD YOU SO
DESIRE. ALL COPIES OF THE SURVEY REPORT WILL BE
FORWARDED TO YOU ON WRITTEN REQUEST. ALL SURVEYS ARE
KEPT IN A LOCKED FILE AND ARE HELD IN~,STRICTEST
CONFIDENCE. i~!.~ii!iii,~ .... !i~/ii~?i~i'~
GREAT LAND DIRECTIONAL DRILLING~INC
12-16-86
Client .............. :
Well ................ : G-PAD WELL
Closure Direct/on...: S 34.53 E
Mognetic [)ecllnotion: 3I deg 30
Doto file nome ...... : B:G24.DAT
STANDARD ALASKA PRODUCTION CO.
~24
mir'~ E
RECORD OF SURVEY
(Well as,~urned ve~ticF, 1-to
Computotlon:
Su=vey dote:
Method ..... :
RKB Height.:
1659.0 }
RADIUS OF CURVATURE
i2-8-86
MWD & SS
73.0 ft
MEAS DR t F T TRUVERT SUBSEA SECT I ON
DEPI'tt DG MN DEPTH U=PTH DIST
DIREECTION
ANGLE
RELATIVE COORDINATES
FROM WELL-HEAD
CLOSURE
DISTANCE DG MN S
DOG LEG
de~ t)0
1659 0 0 1659.00 1586.00
2186 0 30 2185.99 2112.99
2675 0 30 2674.97 2601.97
2971 S i8 2970.Si 2897.5i
3~S4 8 30 3152.16 3079.16
0.00 N 0.00 E
0.62 N 72.00 E
4.00 S 14.00 E
18.72 S 49_00 E
39.9S S S0.10 E
0.00 N 0.00 E
0.75 N 2.27 E
1.06 S S.Si E
13.63 S 13.21 E
27.89 S 29.94 E
0.00 N 0 0 0 E
2.30 N 71 0 0 E
S.6! S 79 S 14 E
18.98 S 44 6 20 E
40.92 S 47 i 39 E
0.000
0.09S
0.001
I .625
1.749
°342~ 12 12 oo,~-,,. ,~.,o.. 07 3264 . 07
ot:oo~_,.._,,_~ 18 18_ .3S16 _ 43 3-443 .43
.o~-,--.~ 2° n 3688 S6 361.~ S6
3898 ,_=,'°~ S4 38SS . 74 ~:'°"~"~ o, ,~_ . 74
4084 34 18 4014.:10 3941.10
72.53
120.16
'183.57
262.93
358.87
S 49.40 E
S 45.80 E
S 47.60 E
S 46.90 E
S 42.00 E
49 72 ~-' SS_""
. ~ ; .: E 74.67
82 ,48 S 91 ~o E 123
127.27 S 139.'03 E i88.41
i82.39 S 198_77 E 269.77
~51.92 S 2dd.~7 E 3d7.07
S 48 iS 30 E
S 47 S9 r_o~= E
S 47 ~'o'°4 E
S 47 27 37 E
S 46 3.9 43 E
1.968
3. 285
o 559
3. 173
3. 021
4540 34 48 4389.68 4316.68
4726 35 0 4542.~=°° 4469
Si96 3d 0 4.~4.85 485~.85
5571 37 0 S226.30 SIS3.30
S760 37 12 S377.04 S304.04
614.36
719.45
988.70
1207.94
1320 _ 12
S 44.8O E
S 42_30 E
S 4S.50 E
S 44.80 E
S 44.80 E
439.80 S 444.64 E 625.40
Si6.92 S 517.96 E 731_77
713.55 S 707.18 E 1004.62
870.86 S 865.32 E 1227.d7
9S1.76 S 945.65 E 1341_68
S 45 18 SO E
S 45 3 27 E
S 44 44 35 E
S 44 49 i E
S 44 48 56 E
0 22~
0. 455
0.
0.
O. 106
6'.~o~
,_.,? 37 0 S757.49 S684.49
6701 36 ,_,': 6130 .23 6057 _ 23
7172 34 6 6515_56 6442.56
7548 32 0 68:30.70 6757.70
7787 34 54' ...... zg~'
8108 36 12 7291.Ed 7218.a6
8468 ad 24. 7~B1-39 7508.39
87~3 3fl 12 7800.I~ 7727.1k
9031 98'::~:~8~ ":8'O~'"'a~"~- 1°c°
9436 38 6 8~A~2'TY 0 8269.70
1603.54
i876.18
2143.64
2346.60
2478.04
2662.39
2869.04
3029. O0
3199.46
3433.67
S 44.10 E
S 43.70 E
S 43.40 E
S 42.00 E
S 29.70 E
S°O O0 E
S 18.80 E
S 17.70 E
S 15.30 E
S 10,70 E
1157.16 S 1147.14 E I629.40
13S6.26 S 1338.74 E 190S.69
ISS2.S4 S 1S2S.33 E 2176.46
1703.23 S 1664.38 E 2381_42
1809.79 S 1741.38 E 2S11.S2
1977_62 S 1822.89 E 2689.46
2177.3S S 1896.97 E 2887_80
2335.61S 1949.16 E 3042.08
2S07.S0 S 2000.07 E 3207_46
2752.82 S 20S6.71E 3436.28
S 44 45 3 E
S 44 37 39 E
S 44 29 37 E
S 44 20 21 E
S 43 S3 47 E
S 42 39 S6 E
S 41 3 48 E
S 39 SO 47 E
S 38 34 38 E
S 36 4S S2 E
O. 068
O. i96
0 '~
0. S68
o 076
0.930
0.318
0 67°
O. 388
0.466
G-PAD WELL //24
DATA
INTERPO[_ATED FOR EVEN
FEET OF SUBSEA DEPTH
22-:[6-86
MEAS.
73
:! 73
2?3
473
TRtJ VERT
DEP T [4
73
173
2773
37:3
:+73
SUB SE--A MD- TVD VERTICAL
DEP T H D I F:F. CORRECT
0 0 0
100 0 0
'":' 00 0 0
r.~
'-':~ 00 0 0
~J
/400 0 0
RELATIVE COORDINATES
FROM WELL-HEAD
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00
E, 73 S73 GO0 0 0 O. O0 O.
673 673 600 0 0 O. O0 O. O0
7'73 7'73 700 0 0 O. O0 O. O0
,n7 '~ 873 8hr) 0 0 0 on 0 Of)
973 9",¢3 900 0 0 0 . O0 O. O0
1073
1:173
1 't~?7
137'"3
't .',,.73
I073
i"1.73
:1273
:1373
2/473
:[000 0 0 0.00 0.00
1100 0 0 0.00 0.00
1200 0 0 0.00 0.00
1300 0 0 0.00 0.00
i]~00 0 0 0.00 0.00
iSO0
1600
1700
18 u o
1900
o
:: u
o
2600
2700
2800
2900
0 0. O0 0. O0
0 0 Of'] N 0
0 O. i 0 N g. 0:3
0 0.3.-3 N 0.:i8
0 0 60 N 0
. . ~.., -._~
0 0.80 N i. :[7
0 0 78 N o
0 :1 10 N .~ at:
. L..
0 1.72 N 3_zt[5
0 o Bi N .'2
0 3 37 N
0 /4.21 N 3.69
0 3. 15 ,.,c-' 6 . 26
0 7 G9 .q 8 6t':
i 13. ,' 8 ~,e 13 . .__,.,
:I 57='._,
]673
1773
1873
:t ? 7,_.,'7'
2073
2173
· '~ ."3 * ;, ~
2z~.73
2.57-.~
277:3,
2873
297~I-
1[-;73
1673
1773
1873 :;.,.~
197'-3
"~L~ f ~,
' .
,,
2773 ~.
L. LJ f ~
2973
W
W
W
W
W
W
L-.
E
E
E
E
F
$-PAD WELL
DATA INTERPOLATED FOR EVEN &O0 FEET OF SUBSEA DEPTH
12-'16-86
MVAS. TRU VERT SUB 'SEA MD-TVD VERTICAL
DEPTIt DEPTH DEPTH D I FF. CORRECT
......~ ,-
.~0 74
3'175
3277
3379
z~277
E '..-] _
46.42
476.4
r: 009
S380
SSOS
S630
STSS
6006
6131
62S6
6~1
6505
,_,~073 3000_ I 0
.q_ 173 3 :i 00
3273 3200 4
t
·
3373 '.-q:'-qO 0 6 '-~
3473 3.400 10 .4
'"~: 3[500 Ic
~';'~3 3600 ~ ~
3773 3700 33 1.1
3873 3800 ~ S 12
:3973 3900 63 :18
.407 ;-1 40 f'~ fl
.... ,._, .'3 ¢...U
4:173 ~ '~.,,.q ,_,n :l 04 ,_.
~273 4200 12S
4'-~7 '~ 22
- ~-, ._, .4300 147 _
447'3 -440 O
-- ~ ,". ¢.._
4673 4500 1°.- 1 :-~'-~
.477'~ ~700 ~.~ -' -~o
4873 4800 '~:~
4973 ~900 283 2~
._,E073 SO00 307 2.4
R173 SlO0 .-,.-~o
- ;._4o,._ 25
t:~73,-,,.- 5200 357 25
S373 S300 382 25
5473 5400 407 25
5573 ~-~Oa~ g33 26
5673 S600 4S8 25
S773 5700 483 25
5873 5800 508 26
5973 5900 .~,_~'=~ 2g
RELATIVE COORDINATES
FROM WELL-HEAD
:-~0 ':;~0o~' :~1 67 E
£-
29.PS S 32..40 E
.41. _~,_.'~ '~ S -4R~ .89 E
r:c OS S
72.0~ S 83.06 E
96.38 S i06.05 E
' ;J'"~ 13.4. o~ E
i,_,._ 81 S
iS:B. 33 S i87_88 E
-~c.; 11 ¢: "
.~_,.~ ,.:0;~, 02.E
22'9.04 S 2:%1 ~t~
. ,_,: E
281.79 S 294.08 E
332.17 S 3.40.75 E
'~ -'-~ '~8 23 E
~31_59 S 436.51 E--
480.61 S 486.0.4 E
532 9.4 S
S8.4.76 S 580.88 E
· ::"~'-' '~0 S 630 '~ E
6~7.25 S 680.63 E
738.~¢~ S
789.69 S
841.33 S
8'.'-}R 8~ S
9-49.59 S
I003.27 S
786. '13 E
8R8 ~ ['2
~.~ _ .
890. 'fY E
943.49 E
996_ 96 E
1056.71 S
1109.91 S
loc,_ BO S
12719_ 04 S
1272.17' S
1050. S3 E
1104_20 E
llSS. 23 E
1207.24 F
.lc,.,: OS E
];-PAD WELl_
DATA INTERPOLATED FOR EVEN I00 FEEl' OF SUBSEA DEPTH
222-16-86
MEAS. TRU VER'f SUB 'SEA MD-TVD VERTICAL
DE P T t4 DE:_ P T H DE P l' H D 'i FF. CORRECT
6630
6?53
6876
6998
7120
72#i
7360
7479
7699
77229
7840
7963
8086
8209
8334
8709
88~6
8964
9092
9219
9347
6073 6000 S57 26
62273 6:100 r-~-
~=,0 23
6273 6200 603 23
6373 6300 625 ~
6473 6400 647 22
6673 6500 668 = 022
6673 6600 ou,'rv :1~.
6773 6700 706 39
~,~3 6800 726 20
6973 6900 746 20
7073 7000 767 21
7173 7100 790 23
7273 7200 813 23
7373 7300 836 23
7473 7400 8622 25
7573 7500
,_,US 24
7673 7600 910 26
7773 7700 936 26
7873 7800 963 27
7~7''~- ~-, 7900 ~.-.- '1 28
8073 8000 22019 28
822273 8300 1046 27
8273 8200 22074 28
RELATIVE (]OORDINATES
FROM WELL-H, EAD
22:3,24.91 S
'1378.46 S
:1429.87 S
224,q0 55 c
22530 S1 '-'
223220.67 E
1.359.97 E
:1409_,_,_°°E
1457. 922 E
22506.04 E
3r380.26 S
I627 S8 o
267 3 7 3
:i722.94 S
2767.30 S
:iSS1.66 E
1597_ :16 E
'1642. 223 F
22682.96 E
:t733.63 E
,_,3,~. 90 S
:1895.93 S
39r34.66 S
2033~ 02 S
2:i00.39 S
i756.66 E
1794.80 E
't836.46 E
1845_ 58 E
22874.811. E
22905_38 E
'19 229.4S E
:1967.07 E
22992.99 E
2544.03 S
2620.30 S
2695.60 S
20220.30 E
o033 21 E
;;;-PAD WELL
DATA INTERPOLATED FOR EVEN I000 FEET OF MEASURED DEPTH
MEAS. TRU VERT SUB SEA
DEPI'tt DEPTH DEPTH
2000 1000 927
2000 2000 1927
3000 2999
4000 3944 3871
50 0 0 478t~ 4893
8000 SS68 S495
7000 6374 8301
8000 7204 7131
PO00 8001 7928
RELATIVE COORDINATES
FROM WELL-HEAD
,0. O0 O. O0
0.86 N 0.37 W
15.47 S 15.33 E
'°i8 74 S 237 24 E
f... . .
~32.25 S d28.38 E
2054.29 S
1481.48 S
1.-°. i3.93 S
248,5 97 c
1048.09 E
1458.80 E
I807.09 E
2000.80 E
HORIZONTAL VIEW
STANDARD ALASKA PRODUCTION CO.
G-PAD WELL #24
CLOSURE: 3436 ft S 36.8 E
DECLINATION: 3i.50 deg E
SCALE: ! inch = 500 feet
DRAWN: ~2-~6-86
25O
25O
5OO
750
lO00
~.§00
:t750
2000
225O
2§00
2750
3000
3?5O
250 0 250 500 750 tO00 i250 i500 i750 ~000 2250 2500 2750
500
~000
~500
2000
2500
3000
3500
4000
4500
5000
550O
6000
65OO
7000
7500
8000
65O0
9000
-500
VERTICAL SECTION
STANDARD ALASKA PRODUCTION CO.
G-PAD WELL #24
..... ,
SECTION AT S 34.53 E
ND SCALE: ! Inch = 1000 feet
,
DEP SCALE' ! 1nth = 1000 feet
DRAHN 't2-t6-86
Itlftmf ~ttfi~tt~ ~ ~ ~
............
........
" ~ ................
~ ...............
.......
........
\
........ ......
.... ........ ,,
, ........... ~' ' ,
..... I~
........... ~ · .. ~
...................
0 500 t000 ~.§00 2000 2§00 3000 3500 4000 4500 5000 55'00
Departure
SUB-SURFACE
DIRECTIONAL
SURVEY
I~UIDANCE
I~ONTINUOUS
I-~OOL
Company
Well Name
Field/Location
~TANDAI~D ALASKA PR, OD, UCTION COMPANY
(~-2z) ()l-18-11-14) (2703'SNL & 1974'WEL,S12,TllN,R13E)
PRUDHOE BAY~ NORTH SLOPE,ALASKA ,,
Job Reference No.
72172
Logc~ed By.'
RATHERT
Date,
1/23/87
Computed By:
KRUWELL
GCT DIRECTIONAL SURVEY
CUSTOMER LISTING
FOR'
STANDARD ALASKA PRODUCTION CO
G-24 (11-18-11-14)
PRUDHOE BAY
NORTH SL'OPE,ALASKA
SURVEY DATE: 23-JAN-87
ENGINEER: RATHERT
METHODS OF COMPUTATION
TOOL LOCATION: TANGENTIAL- AVERAGED DEVIATION AND AZIMUTH
INTERPOLATION: LINEAR
VERTICAL SECTION: HORiZ. DI.ST. PROJECTED ONTO A TARGET AZIMOTH OF SOUTH 34 DEG 32 MIN EAST
STANDARD ALASKA PRODUCTION CO
G-24 (Il-lB-Il-14)
PRUDHOE BAY
NORTH SLOPE~ALASKA
COMPUTATION DATE: 28-JAN-87
PAGE- 1
DATE DF SURVEY: 23-JAN-8?
KELLY BUSHING ELEVATZON: 72.06 .FT
ENGINEER: RATHERT
INTERPOLATED VA!LUES FOR EVEN 100 FEET OF MEASURED DEPTH
TRUE SUB-SEA COURSE
MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH
DEPTH DEPTH DEPTH , DEG MIN DEG MIN
0.00 0,00 -72,06 0 0 N 0 0 E
100,00 100,00 2'7.94 0 1 S 68 4 W
200,00 200,00 127,94 0 2 N 5 44 W
300,00 300,00 227,94 0 2 S 60 9 W
400.00 400.00 327.94 0 2 N 24 59 W
500.00 500.00 427.94 0 3 S 39 0 E
600.00 600.00 527.94 0 4 S 67 5 W
700.00 700.00 627.94 0 5 N 60 9 W
800,00 800.00 727,94 0 4 N 9 54 W
900,00 900,00 827,94 0 4 N 8 42 W
1000,00 1000,00 927,94
1100.00 1100,00 1027,94
1200,00 1200,00 1127.94
1300,00 1300,00 1227,94
1400,00 1400.00 1327.94
1500.00 1500.00 1427.94
1600,00 1600.00 1527,94
1700.00 1700.00 1627.94
1800,00 1800.00 1727.94
1900.00 1900.00 1827.94
0 4 N 53 22 W
0 4 N 68 9 W
0 5 S 75 1W
0 6 S 9 2 W
0 4 N 45 20 W
0 4 N 31 55 W
0 5 N 46 53 E
0 6 S 61 55 E
013 $77 I E
026 N 89 9 E
2000.00 1999.99 1927.93
2100.00 2099.99 2027.93
2200,00 2199.99 2127.93
2300.00 2299.99 2227.93
2400.00 2399.99 2327.93
2500.00 2499.99 2427.93
2600.00 2599.99 2527.93
2700.00 2699.98 2527.92
2800.00 2799.98 2727.92
2900.00 2899.89 2827.83
0 29 N 89 3 E
0 21 S 84 48 E
0 10 S 54 17 E
0 11 S 6 49 W
0 10 S 10 7 W
0 18 S 19 25 W
016 S 1 3 E
0 22 S 3 38 E
0 45 S 42 19 E
419 S 49 3 E
3000.00 2999.49 2927.43 5 47
3100.00 3098.83 3026.77 7 13
3200.00 3197.61 3125.55 10 52
3300.00 3295.62 3223.56 11 55
3400.00 3393.20 3321.14 13 29
3500.00 3489.58 3~17.52 17 28
3600.00 3584.35 3512.29 19 39
3700.00 3677.76 3605.70 22 17
3800.00 3769.12 3597.06 25 28
3900.00 3858.20 3786.14 28 30
VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE
SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUTH
FEET DEG/IO0 FEET FEET FEET DEG MIN
0,00 0,00 0,00 N 0,00
-0,03 0,02 0,01 N 0,04
-0,06 0,14 0,02 N 0,08
-0.03 0.57 0.02 ht 0.01
-0.05 1.03 0.06 N 0.00
-0.13 1.14 0.12 N 0.05
-0.21 0.86 0.18 N 0.11
-0.31 0.83 0.25 N 0.18
-0.41 0.99 0.32 N 0.26
-0.42 0.94 0.30 N 0.30
-0'42 0.91 0.27 N 0.35 W
-0.41 0.92 0.23 N 0.38 W
-0.38 0.77 0.19 N 0.40 W
-0.36 0.57 0.15 N 0.41 W
-0.35 0.70 0.11 N 0,47 W
-0.33 0.64 0.06 N 0.49 W
-0.29 0.98 0,02 N 0.47 W
-0.14 0.51 0.04 S 0.30 W
0.01 0.28 0,05 S 0.06 w
0.35 0,78 0,09 S 0.48 E
0.00 N 0 0 ~
0.04 N 79 9 W
O. 08 N 78 9 W
0.03 Iq 28 16 ~
O. 06 N 0 45 ~
0.13 N 23 28 .
0,21 N 31 53 :~
0.31 N 35 51 ~
0.41 N 38 59 W
0.43 N 45 15 W
0,88 1.14 0,15 S 1.33
1.35 0,40 0.17 S 2.14
1.66 0,19 0,26 S 2.56
1.94 0.76 0.54 S 2.64
2.13 0.61 0.84 S 2.55
2.41 0.67 1.23 S 2.45
2.72 0.94 1.68 S 2.36
3.17 0.24 2.22 S 2.37
3.97 0.64 2.89 S 2.80
7.59 3.53 5.34 S 5.63
0.44 N 52 7 W
0.44 N 58 W3 W
0.44 N 64 51W
0.44 N 69 43 W
0.48 N 77 18 W
0.49 N 82 40 W
0.47 N 87 23 W
0.30 S 83 12 W
0.08 S 46 10 ~
0.49 S 79 55 E
S 49 7 E 16,19 3,11
S 49 53 E 27.20 1.48
S 50 59 E 42.04 1.56
S 50 15 E 61.11 0.82
S 49 50 E 82,15 2.34
S 48 17 E 107.88 3.23
S 47 12 E 138.93 2.88
S 46 47 E 173.78 3.58
S 46 40 E 213.47 2.98
S 46 2 E 257.90 3.05
1.34 S 83 41 E
2.15 S 35 32 E
2.57 S 84 13 E
2.70 S 78 32 ~
2.68 S 71 49
2.75 S 63 16
2.90 S 54 31 E
3.25 S 46 45 E
4.02 S 44 8 E
7.76 S 46 32 E
11,17 S 12.32 E 16.64 S 47 48 E
18.51 S 21.07 E 28.05 S 48 41 E
28.34 S 32.97 E 43.48 S 49 19 E
40.92 S 48.34 E 63.33 S 49 4b ~
54.95 $ 65.06 E 85.16 S 49 %8 E
72.38 S 85.14 E 111.74 S 49 37 E
93.81 S 108.75 E 143.62 S 49 13 E
118.19 S 134.80 E 179.27 S 48 45 E
146,00 S 164.40 E 219.87 S 48 23 E
177.32 S 197'27 E 265.25 S 48 2 E
STANDARD ALASKA PRODUCTION CO
G-24 (11-18-11-14)
PRUDHOE BAY
NORTH SLOPE,ALASKA
COMPUTATION DATE: 28-J&N-87
PAGE 2
DATE OF SURVEY: 23-JAN-87
KELLY BUSHING. ELEVATION: 72.06 FT
ENGINEER: RATHERT
INTERPOLATED VALUES FOR EVEN 100 FEET OF MEASURED OEPTH
TRUE SUB-SEA COURSE
MEASURED VERTICAL VERTICAL DEVIATION AZIMDTH
OEPTH OEPTH DEPTH DEG MIN DEG MiN
4000.00 3944.89 387Z.83 31 14
4100.00 4029.06 3957.00 33 42
4200.00 4111.97 4039.91 34 11
4300.00 4194.49 4122.43 34 32
4400.00 4276.89 ~Z04.83 34 28
4500.00 4359.17 4287.11 34 45
4600.00 4441.21 4369.15 34 57
4700.00 4523.13 4451.07 35 3
4800.00 4605.00 4532.94 35 1
4900.00 4686.7'6 4614.70 35
5000.00 4768.44 4596,38 35 12
5100.00 4849.89 4777.83 35 40
5200.00 4930,81 4858.75 36 10
5300.00 5011.43 4939.37 36 16
5400.00 5092.07 5020.01 36 14
5500.00 5172.81 5100.75 36 13
5600.00 5253.09 5181.03 36 51
5700.00 5332.99 5260.93 36
5800.00 5412.63 5340.57 37 31
5900.00 5491.69 5419.63 37 50
6000.00 5570.70 5498.64 37 48
6100.00 5649.81 5577.75 37 38
6200.00 5729.26 5557.20 37 5
6300.00 5809.23 5737.17 36 51
6400.00 5889.39 5817.33 36 37
6500.00 5969.67 5897.61 36 23
6600.00 6050.26 5978.20 36 12
6700.00 6131.05 6058.99 36 2
6800.00 6212.21 6140.15 35 22
6900.00 6293.95 6221.89 34 54
7000.00 6376.17 6304.11 34 29
7100.00 6458.80 6386.74 34 6
7200.00 6541.74 6469.68 33 44
7300.00 6625.13 6553.07 33 14
7400.00 6709.06 6637.00 32 39
7500.00 6793.52 6721.46 32 2
7600.00 6878.63 6806.57 31 18
7700.00 6964.15 6892.09 31 43
7800.00 7047.76 6975.70 34 44
7900.00 7129.31 7057.25 35 38
VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. OEPARTURE
SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUTH
FEET DEG/IO0 FEET FEET FEET DEG MIN
S 44 41 E 306.82
S 43 24 E 360.07
S 43 30 E 415.33
S 43 27 E 471.10
S 43 18 E 527.10
S 43 23 E 583.25
S 43 26 E 639.75
S 43 8 E 696.43
S 42 45 E 753°23
S 42 28 E 810.24
S 42 21 E 867.39
S 42 16 E 924.87
S 42 4 E 983.09
S 41 48 E 1041.76
S 41 31 E 1100.44
S 41 9 E 1159.03
S 40 53 E 1218.27
S 40 41 E 1278.05
S 40 20 E 1338.20
S 40 17 E 1399.11
S 40 15 f 1460.10
S 40 17 E 1520.97
S 40 27 E 1581.37
S 40 24 E 1641.09
S 40 23 E 1700.56
S 40 23 E 1759.88
S 40 25 E 1818.79
S 40 19 E 1877.39
S 40 1! E 1935.53
S 40 13 E 1992.86
S 40 10 E 2049.49
S 40 2 E 2105.57
S 40 10 E 2161.18
S 40 14 E 2216.09
S 40 10 E 2270.18
S 39 45 E 2323.48
S 39 3 E 2375.79
S 37 14 E 2427.49
S 29 28 E 2482.28
S 24 46 E 2539.54
3.02
0.88
0.46
0.49
0.48
0.31
0.16
0.23
0.51
0.09
212.24 S 232'82 E 315.04 S 47
251.18 S 270.17 f 368.90 S 47 5 f
291.79 S 308.62 E 424.73 S 46 36 E
332.72 S 347.54 E 481,13 S 45 14
373.96 S 386.39 E 537.72 S 45 56
415.28 S 425.40 E 594.49 S 45 41
456.81 S 464.71 E 651.64 S 45 29 E
498.53 S 50~.07 E 708.95 S 45 I8
540.55 S 543.20 E 766.33 S
582.94 S 582.17 E 823.86 S 44 57 E
0.36
0.58
0.32
0.29
0.30
O. 42
0.32
0.24
0.60
0.09
625.5W S 621.06 f 881.50 S 44 47 f
668.46 S 660.12 E 939.46 S 44 38 f
711.96 S 699,60 E 998.16 S 44 29 E
755.96 S 739.15 f 1057.25 S 44 21 E
800.13 S 778.47 E 1116.35 S ~4 12 E
844.43 S 817.46 ~ 1175.29 S 44 4 E
889.42 S 856.57 E 1234.82 S 43 55 E
934.95 S 895.85 E 1294.87 S 43 46 E
980.96 S 935.10 E 1355.25 S 43 37 E
1027.66 S 974.70 ~ 1416.38 S 43 29 E
0.I0
0.07
0.26
0.58
0.11
0.75
0.32
0.17
0.46
0.69
1074.42 S 1014.34 C 1477.59 S 43 21 E
1121.10 S 1053.8U E 1538.67 S 43 13 E
1167.36 S 1093.20 E 1599.32 S ~3 7 E
1213.05 S 1132.14 f 1659.29 S 43 1 ~
1258.60 S 1170.86 E 1719.01 S 42 55
1304.03 S 1209.48 E 1778.58 $ 42 50
1349.12 S 1247.87 E 1837.74 S 42 46 ~
1394.00 S 1286.05 E 18'96.61 S ~2 41 E
1438.63 S 1323.74 ~ 1954.98 S 42 37 E
1482.63 S 1360.93 E 2012.54 S 42 32 E
0.21
0.13
0.63
1.02
0.34
0.99
0.88
3.63
6.64
0.64
1526.12 S 1397.63 k 2009.40 S 42 29 ~
1569.23 S 1433.90 E 2125.69 S 42 25 f
1611.99 S 1469.86 E 2181.52 S 42 21 E
1654.11 S 1505.52 E 2236.67 S 42 18 E
1695.62 S 1540.61- E 2290.99 S 42 15 E
1736.64 S 1575.03 E 2344.49 S 42 12 E
1777.20 S 1608.36 E 2396.93 S 42 8 E
1817.76 S 1640.63 E 2~8.65 S 42 4 ~
1863.25 S 1571.17 E 2502.90 S 41 53 E
1915.10 S 1696.8~ E 2558.68 S 41 32 E
STANDARD ALASKA PRODUCTION CO
G-24 (11-18-11-14)
PRUDHOE BAY
NORTH SLOPE~ALASKA
COMPUTATION DATE: 2B-JAN-87
PAGE-
DATE OF SURVEY: 23-JAN-aT..
KELLY BUSHING ELEVATION: 72.06
ENGINEER: RATHERT
INTERPOLATED VALUES FOR EVEN 100 FEE'T OF MEASURED DEPTH
TRUE SUB-SEA COURSE VERTICAL DOGLEG RECTANGULAR COORCINATES HORIZ. DEPARTURE
MEASURED VERTICAL VERTICAL DEVIATION .AZIMUTH SECTION SEVERITY NORTH/SOUTH EAST/WES'T DIST. AZIMUTH
DEPTH DEPTH DEPTH DEG MIN
8000.00 7210.45 7138.39 35 58
8100.00 7291.20 7219.14 36 17
8200.00 7371.57 7299.51 36 32
8300.00 7451.94 7379.88 36 24
8400.00 7532.44 7460.38 36 25
8500.00 7612.76 7540.70 36 45
8600.00 7692.35 7620.29 37 55
8700°00 7770.89 7698.83 38 17
8800.00 7849.33 7777.27 38 22
8900,00 7927.85 7855.79 38 5
9000.00 8006.25 7934.20 38 36
91'00.00 8084.08 8012.02 39 10
9200.00 6161.81 8089.75 38 37
9300.00 8239.99 8167.93 38 32
9400.00 8318.50 8246.44 38 4
9500.00 8397,29 8325.24 37 49
9600.00 8476.36 8404.30 37 27
9700.00 8556.15 8484.09 37 5
9800.00 8635.44 8563.38 37 55
9900.00 8714.00 8641.95 38 35
10000.00 8791.37 8719.31 39 58
10100.00 8867.28 8795.22 40 58
10200.00 8942.65 8870.59 41 21
10300.00 9017.31 8945.25 41 57
10400.00 9091.15 9019.09 42 35
10475.00 9146.35 9074.29 42 35
DEG MIN FEET DEG/IO0 FEET FEET FEET DEG MIN
S 23 57 E 2597.07
S 22 78 E 2654.95
S 22 0 E 2713.17
S 20 48 E 2771.09
S 19 55 E 2828.60
S 19 7 E 2886.14
S 18 7 f 2944.35
S 17 49 E 3003.69
S 16 48 E 3062.94
S 15 31 E 3121.74
S 14 35 E 3180.25
S 13. 57 E 3239.20
S 13 3 E 3297.96
S 11 59 E 3355.77
S 10 47 E 3412.73
S 10 1 E 3468.88
S 10 43 E 3524.72
S 11 59 E 3580.12
S 12 55 E 3636.58
S 14 28 E 3694.40
S 15 48 ~ 3754.18
S 16 27 E 3815.98
S 16 32 E 3878.48
S 17 5 E 3941.84
S 17 30 E 4006.28
S 17 30 E 4054.82
0.73
0.85
0.71
0.66
0.38
0.93
1.40
0.78
0 · 64
0.74
1968.35 S 1720.92 E 2614.57 S 41 9 E
2022.44 S 1744.43 E 2670.82 S 40 46 E
2077.44 S 1767.19 E 2727.40 S 40 23 E
2132.85 S 1788.86 E 2783.71 S 39 59"
2188.47 S 1809.47 E 2839.64 S 39 3~ )
2244.61 S 1829.38 E 2895.67 S 39 10 ~
2301.99 S 1848.68 E 2952.42 S 38 46 =
2360.86 S 1867.81 E 3010.38 S 38 20 E
2420.07 S 1886.27 E 3068.35 S 37 56 E
2479.52 S 1903.61 E 3125.98 S 37 30 E
1.73 2539.47 S 1919.70 E 31~3.42 S 37 5 E
3.23 2600.31 S 1935.28 E 3241.43 S 36 39 E
1.43
2.38
0.84
0.95
1.35
0.95
1.15
1.65
2661.43 S 1950.12 E 3299.41 S 36 13 E
2722.33 S 1963.58 E 3356.59 S 35 48 E
2783.04 S 1975.83 E 3413.10 S 35 22 E
2843.60 S 1966.57 E 3468.97 S 34 56 f
2903.85 S 1997.83 E 3524.72 S 34 31 E
2962.93 S 2009.68 E 3580.20 S 34 8 E
3022,43 S 2022.83 E 3636.88 S 33 47 E
3082.54 S 203'7.46 E 3695.04 S 33 27 E
1.33
0.48
0.84
1.08
0.00
0.00
3143.70 S 2054.05 E 3755.26 S 33 9 E
3206.18 S 2072.25 E 3817.27 S 32 52 E
3269.23 S 2090.~ f 3880.58 S 32 36 E
3332.89 S 2110.15 E 3944.73 S 32 20 E
3397.25 S 2130.29 E 4009.92 S 32 5
3445.66 S 2145.56 E 4059.06 S 31 54
COMPUTATION DATE: 28-JAN-87 PAGE 4
STANDARD ALASKA PRODUCTION CO
G-24 (11-18-11-14)
PRUOHOE BAY
NORTH SLOPEtALASKA
D~TE OF SURVEY: 23-JAN-BT.
KELLY BUSHING ELEVATION: 72.06 PT
ENGINEER: RATHERT
INTERPOLATED VALUES FOR EVEN 1000 FEET OF MEASURED DEPTH
TRUE SUB-SEA COURSE
MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH
DEPTH DEPTH DEPTH DEG MIN DEG MIN
0.00 0.00 -72.06 0 0
1000.00 1000.00 927.94 0 4
2000.00 1999.99 1927.93 0 29
3000.00 2999.49 2927.43 5 47
4000.00 3944.89 3872.83 31 14
5000.00 4768.44 4696.38 35 12
6000.00 5570.70 5498.64 37 48
7000.00 6376.17 6304.11 34 29
8000.00 7210.45 7138.39 35 58
9000.00 8006.26 7934.20 38 36
10000.00 8791.37 8719.31 39 58
10475,00 9146.35 9074.29 42 35
VER'TICAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE
SECTION SEVERITY NORTH/SOUTH EAST/W~ST DIST. AZIMUTH
FEET DEG/IO0 FEET FE~T FEET DEG MIN
N 0 0 E 0.00
N 53 22 W -0.42
N 89 3 E 0.88
S 49 7 E 16.19
S 44 41 E 306.82
S 42 21 E 867.39
S 40 15 E 1460.10
S 40 10 E 2049.49
S 23 57 E 2597.07
S 14 35 E 3180.25
S 15 48 E 3754.18
S 17 30 E 4054.82
0.00
0.91
1.14
3.11
3.02
0.36
0.10
0.21
0.73
1.73
0.00 N 0.00 E 0.00 N 0 0 E
0.27 N 0.35 W 0.44 N 52 7 N
0.15 S 1.33 E 1.34 S 83 41 E
11.17 S 12.32 E 16.64 S 47 48 ~
212.24 S 232.82 E 315.04 S 47 38
625.54 S 621.08 E 881.50 S 44 47 .
1074.42 S 1014.34 E 1477.59 S 43 21 :
1526.12 S 1397.63 E 2069.40 S 42 29 E
1968.35 S 1720.92 E 2614.57 S 41, 9 E
2539.47 S 1919.70 E 3183.42 S 37 5 E
1.33
0.00
3143.70 S 2054.05 5 3755.26 S 33 9 E
3445.66 S 2145.56 E 4059.05 S 31 54 E
STANDARD ALASKA PRODUCTION CO
G-24 (11-18-11-14)
PRUDHOE BAY
NORTH SLOPEtAL'ASKA
COMPUTATION DATE: 28-JAN-87
DATE OF SURVEY: 23-JAN-87
KELLY BUSHING ELEVATION: 72,06 .FT
ENGINEER: RATHERT
INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH
TRUE SUB-SEA COURSE
MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH
DEPTH DEPTH DEPTH DEG MIN DEG MIN
0.00 0.00 -72.06 0 0 N 0 0 E
72.06 72.06 0.00 0 2 N 82 27 W
172.06 172.06 100.00 0 1 N 69 50 W
272.06 272.06 200.00 0 4 S 53 43 E
372.06 372.06 300.00 0 3 N 78 15 W
472.06 472.06 400.00 0 6 N 58 10 W
572.06 572.06 500.00 0 5 N 23 49 W
672.06 672.06 600.00 0 5 N 10 10 E
772.06 772.06 700.00 0 3 S 32 18 E
872.06 872.06 800.00 0 4 S 2 42 W
972.06 972.06 900.00
1072.06 1072.06 1000.00
1172.06 1172.06 1100.00
1272.06 1272.06 1200.00
1372.06 1372.06 1300.00
1472.06 1472.06 1400.00
1572.06 1572.06 1500.00
1672.06 1672.06 1600.00
1772.06 1772.06 1700.00
1872.06 1872.06 1800.00
0'4 S 35 15 E
0 4 S 56 11 E
0 3 N 89 54 E
0 3 N 23 29 E
0 6 S 21 54 W
0 6 S 45 20 W
0 4 S 64 16 W
0 8 N 82 12 E
0 7 N 88 28 E
0 21 S 83 37 E
1972.07 1972.06 1900.00
2072.07 2072.06 2000.00
2172.07 2172.06 2100.00
2272.0'7 2272.06 2200.00
2372.07 2372.06 2300.00
2472.07 2472.06 2400.00
2572.07 2572.06 2500.00
2672.07 2672.06 2600.00
2772.08 2772.06 2700.00
2872.11 2872.06 2800.00
0 32 S 83 19 E
0 25 N 86 32 E
0 12 S 60 20 E
0 11 S 3 44 W
0 11 S 34 24 W
012 S 8 22 W
0 18 S 14 10 W
0 20 S 13 44 E
0 31 S 40 56 E
3 18 S 49 47 E
2972.45 2972.06 2900.00 5 15
3073.02 3072.06 3000.00 6 W9
3174.01 3172.06 3100.00 10 3
3275.93 3272.06 3200.00 11 43
3378.28 3372.06 3300.00 13 5
3481.65 3472.06 3400.00 16 50
3586.97 3572.06 3500.00 19 21
3693.85 3672.06 3600.00 22 5
3803.27 3772.06 3700.00 25 34
3915.80 3872.06 3800.00 28 57
VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE
SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUTH
FEET DEG/IO0 FEET FEET FEET DEG MIN
0.00 0.00 0.00 N 0.00 E
-0.02 0.14 0.01 N 0.03 W
-0.04 0.14 0.00 N 0.07 W
-0.06 0.39 0.05 N 0.02 W
-0.03 0.66 0.04 N 0.00 W
-0.I0 0.61 0.09 N 0.0~, W
-0.19 0,79 0.16 N 0oll W
-0.30 0.95 0.24 N 0.17 W
-0.39 1.12 0.31 N 0.23 W
-0,41 0.80 0,31 N 0,28 W
-0.42 '0.88 0.29 N 0.32
-0.42 0.92 0.26 N 0.36
-0.40 0.77 0.22 N 0.39
-0.39 0.85 0.17 N 0.43
-0.34 0.64 0.12 N 0.43
-0.31 0.55 0.07 N 0.45
-0.28 0.57 0.02 N 0,47
-0.20 0.82 0.02 S 0,37
-0.03 0.74 0.06 S 0.14
0.23 0.31 0.07 S 0.31
0.00 N 0 0 E
0.03 N 69 32 W
0.07 N 86 51 W
0.06 N 23 25
0.04 N 2 52
0.10 N 26 42 ~
0,19 N 33 49 W
0.30 N 35 20 W
0.39 N 35 43 W
0,41 N 41 46 W
0.72 1.36 0.11 S 1.10 E
1.24 0.42 0.16 S 1.95 E
1.58 0.56 0.21. S 2.49 k
1.87 0.47 0.45 S 2.65 E
2.10 0.68 0.77 S 2.59 E
2.31 0.50 1.10 S 2.47 E
2.64 0.4I 1.56 S 2.38 E
3.01 0.59 2.04 S 2.35 E
3.65 1.Oi 2.64 S 2.60 E
5.79 4.05 4.13 S 4.7.2 E
0.43 N 47 47 W
0.44 N 54 28 W
0.45 N 51 16 W
0.46 N 68 3 W
0.45 N 74 18 W
0.~-5 N :31 26 ~
0.47 N 8'7 59 W
0.37 S 87 29 W
0.15 S 68 23 W
0.31 $ 76 16 E
S 48 52 E 13.66 0.69
S 50 8 E 24.02 1.17
S 50 54 E 37.44 6.26
S 50 27 E 56.37 0.73
S 49 52 E 77.35 1.47
S 48 35 E 102.58 3.89
S 47 23 E 134.72 2.53
S 46 48 E 171.52 3.38
S 46 39 E 214.86 3.01
S 45 55 E 265.35 3.00
1.11 S 84 15 E
1.96 S '85 14 E
2.50 S 55 10 E
2.69 S 80 18 E
2.70 S 73 21
2.71 S 65 56
2.85 S 56 44 ;
3.11 S 48 56 '~
3.70 S ~4 31 E
,5.90 S 45 37 E
9.45 S 10.35 E 14.02 S 47 36 E
16.40 S 18.54 E 24.75 S 48 30 E
25.32 S 29.27 c 38.69 S 49 7 E
37.77 S 44.54 E 5~.40 S 49 42 E
51.75 S 61.25 E 80.18 S 49 48 E
68.74 S 81.05 E 106.28 S 49 41 ~
90.89 S 105.57 E 139.30 $ 49 16 E
116.61 S 133.11 E 176.97 S 48 46 E
146.98 S 165.43 E 221.29 S 48 22 E
182.60 S 202.73 E 272.84 S ~7 59 E
STANDARD ALASKA PRODUCTION CO
G-24 (11-18-11-14)
PRUDHOE BAY
NORTH SLOPEtALASKA
COMPUTATION DATE: 28-JAN-87
PAGE
DATE OF SURVEY: 23-JAN-87'
KELLY BUSHING ELEVATICN: 72.06
' ENGINEER: RATHERT
INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA OEPT~
TRUE SUB-SEA COURSE
MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH
DEPTH DEPTH' DEPTH OEG MIN DEG MIN
4031.93 3972.06 3900.00 32 10
4151.80 4072.06 4000.00 34 2
4272.77 4172.06 4100.00 34 28
4394.14 4272.06 4200.00 34 28
4515.69 4372.06 4300.00 34 47
4637.63 4472.06 4400.00 34 57
4759.79 4572.06 4500.00 35 2
4882.01 4672.06 4600.00 35 11
5004.44 4772.06 4700.00 35 14
5127.33 4872,.06 4800.00 35 52
VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE
SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUTH
FEET DEG/IO0 FEET FEET FEET DEG MIN
5251.14 4972.06 wgo0.o0 36 16
5375.18 5072.06 5000.00 36 16
5499.08 5172.06 5100.00 36 13
5623.71 5272.06 5200.00 36 54
5748.96 5372.06 5300.00 37 10
5875.14 5472.06 5400.00 37 49
6001.72 5572.06 5500.00 37 48
6128.10 5672.06 5600.00 37 33
6253.59 5772.06 5700.00 36 50
6378.40 5872.06 5800.00 36 37
S 44 2 E 323.34
S 43 25 ~E 388.63
S 43 34 E 455.85
S 43 17 E 523.83
S 43 24 E 592.09
S 43 22 E 661.04
S 42 56 E 730.41
S 42 30 E 799.97
S 42 21 E 869.93
S 42 16 E 940.69
6502.96 5972.06 5900.00 36 22
6627.02 6072.06 6000.00 36 9
6750.61 6172.06 6100.00 35 46
6873.28 6272.06 6200.00 35 3
6995.01 6372.06 6300.00 34 30
7116.02 6472.06 6400.00 34 5
7236.43 6'572.06 6500.00 33 33
7356.01 6672.06 6600.00 32 53
7474.64 6772.06 6700.00 32 15
7592.31 6872.06 6800.00 31 22
S 41 57 E 1013.06
S 41 36 E 1085.86
S 41 9 E 1158.49
S 40 49 E 1232.40
S 40 24 E 1307.38
$ 40 17 E 1383.94
S 40 15 E 1461.15
S 40 18 E 1538.05
S 40 25 E 1613.46
S 40 23 E 1687.74
7709.31 6972.06 6900.00 31 58
7829.70 7072.06 7000.00 35 13
7952.64 7172.06 7100.00 35 45
8076.27 7272.06 7200.00 36 11
8200.62 7372.06 7300.00 36 32
8325.00 7472.06 7400.00 36 21
8449.25 7572.06 7500.00 36 33
8574.33 7672.06 7600.00 37 34
8701.49 7772.06 7700.00 38 17
8828.97 7872.06 7800.00 38 16
S 40 23 E 1761.62
S 40 25 E 1834.64
S 40 8 E 1906.91
S 40 10 E 1977.61
S 40 9 E 2046.68
S 40 2 E 2114.51
5 40 I4 E 2181.27
S 40 13 E 2246.49
S 39 53 E 2310.04
S 39 7 E 2371.81
S 36 45 E 2432.40
S 27 13 E 2499.24
S 24 15 E 2569.79
S 23 13 E 2641.20
S 21 $9 E 2713.53
S 20 34 E 2785.50
S 19 28 E 2856.87
S 18 22 E 2929.26
S 17 48 E 3004.58
S 16 31 E 3080.03
3.32
0.36
0.63
0.49
0.23
0.36
0.52
0.12
0.41
0.85
224.22 S 244.55 E 331.78 S' 47 28 E
2'72.17 S 290.04 E 397.74 S 46 49 E
321.53 S 336.90 E 465.71 S 46 20 E
371.55 S 384.12 E 534.42 S 45 57
421.78 S 431.55 E 603.43 S 45 39
472.46 S 4'79.53 E 673.17 S 45 25
523.64 S 527.52 E 743.29 S 45 12
575.30 S 575.16 E 813.50 S 44 59 E
627.44 S 622.81 E S84.06 S 44 47 E
680.27 S 670.36 E 955.42 S 44 36 E
0.30
0,. 34
0.42
0.60
0.83
0.04
0.11
0.69
1.01
0.07
734.42 S 719.83 E 1028.36 S 44 .25 E
789.14 S 768.73 E 1101.67 S 44 14 E
844.02 S 817.10 E 1174.74 S 44 4 E
900.18 S 865.88 E 1249.02 S 43 53 E
957.36 S 915.05 E 1324.33 S 43 42 E
1016.03 S 964.84 E 1401.16 S 43 31 ~'
1075.22 S 1015.02 ~ 1478.64 S 43 21 E
1134.19 S 1064.98 E 1555.82 S 43 11 E
1191.91 $ 1114.12 E 1631.54 S 43 4 E
1248.79 S 1162.51 E 1706.13 S 42 57 E
0.62
0.04
0.75-
0.51
0.26
0.30
0.69
0.77
0.66
1.06
1305.37 S 1210.51 E 1'780.33 S 42 50 E
1361.26 S 1258.20 E 1853.67 S 42 44 E
1416.64 S 1305.21 E 1926.25 'S 42 39 E
1470.93 S 1351.04 E 1997.23 S 42 34 E
1523.96 S 1395.81 E 2066.58 S 42 29
1576.12 S 1439.67 E 2134.67 S 42 24
1627.41 S 1482.90 E 2201.69 S 42 20 ~
1677.44 S 1525.25 E 2267.20 S 42 16 E
1726.27 S 1566.38 E 2331.00 S 42 13 E
1774.10 S 1605.84 E 2392.94 S 42 9 E
3.87
3.65
0.70
0.67
0.72
0.95
1.20
1.71
0.72
1821.68 S 1643.58 E 2453.55 S 42 3 E
1878.32 S 1679.19 E 251~.48 S 41 47 E
1943.04 S 1709.59 E 2588.07 S 41 20 E
2009.54 S 1738.~2 E 2657.45 S 40 52 E
2077.78 S 1767.33 E 2727.75 S 40 23 E
2146.73 S 1794.10 E 2797.72 S 3~ 53 E
2216.00 S 1819.33 E 2867.16 S 39 23 E
2287.07 S 1843.74 E 2937.70 $ 38 52 E
2361.74 S 1868.09 E 3011.24 S 38 20 E
1.04 2437.28 S 1891.43 E 30~)5.10 S 37 48 ~
STANDARD ALASKA PRODUCTION CO
G-24 (11-18-11-14)
PRUDHOE BAY
NORTH SLOPE,ALASKA
COMPUTATION DATE: 28-JAN-87
PAGE'
DATE OF SURVEY: 23-JAN-B7
KELLY BUSHING ELEVATION: 72.06 FT
ENGINEER: RATHER'T
INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA OEP'TH
TRUE SUB-SEA COURSE VERTICAL' DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE
MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUTH
DEPTH DEPTH DEPTH DEG MIN
8956.23 7972.06 7900.00. 38 24
9084.50 8072.06 8000.00 39 9
9213.12 8172.06 8100.00 38 47
9340.90 8272.06 8200°00 38 19
9468.00 8372.06 8300.00 37 58
9594.59 8472.06 8400.00 37 31
9719.97 8572.06 8500.00 37 14
9846.51 8672.06 8600.00 38 12
9974.85 8772,06 8700.00 39 42
10106.33 8872.06 8800.00 40 59
10239.28 8972.06 8900.00 41 39
10374.07 9072.06 9000.00 42 35
10475.0'0 9146.35 9074.29 42 35
OEG MIN FEET DEG/IO0
S 14 56 E 3154.53
S 14 7 E 3230.02
S 12 58 E 3305.60
S 11 30 E 3379.14
S 10 8 E 3450.98
S 10 40 E 3521.71
S 12 13 E 3591.27
S 13 37 E 3663.31
S 15 29 E 3738.93
S 16 28 'E 3819.93
S 16 46 E 3903.25
S 17 30 E 3989.50
S 17 30 E 4054.82
1.41
1.61
1.92
1.25
0.45
1.28
0.91
0.94
1.44
0.40
0.88
0.00
0.00
FEET FEET FEET OEG MiN
2513.05 S 1912.7~ E 3158.16 S 37 16 E
2590.80 S 1932.90 E 3232.39 S 36 43 E
2669.42 S 1951.97 E 3306.96 S 36 10 E
2747.16 S 1968.72 E 3379.76 S 35 37
2824.24 S 1983.44 E 3451.14 S 35 4 '}
2900.62 S 1997.22 E 3521.71 S 34 32 :
2974.73 S 2012.21 E 3591.38 S 34 4 E
3050.34 S 2029.42 E 3663.76 S 33 38 E
3128.18 S 2049.69 E 3739.89 S 33 i4 E
3210.17 S 2073.43 E 3821.56 S 32 51 E
3294.16 S 2098.34 E 3905.71 S 32 29 E
3380.51 S 2125.01 E 3992.93 S 32 9 E
3445.66 S 2145.56 E 4059.06 S 31 54 E
SCHLUMBERGER
D I REC T I ONAL SURV E Y
COMPANY
STANDARD ALASKA PRODUCTION
NELL
0-24( 11-18-11-14 )
F I ELD PRUOHOE BAY
COUNTRY USA
RUN 1
DATE LOOOEO 23 - JAN - 87
REFERENCE 72172
~CLL. a-4~ ~ I I- IO- I I- Ifil
(2703'SNL & 1974'~EL, SlZ,T11~,R13E)
HORIZONTAL PROJECTION
NORTH 3000 REF 72172 SCALE : 1/ 1000 IN/FT
-'T"T'T"T"T'T"T'"'F'7.. ....... T""!'"7"?"'T"'T'"?'"'!'"'~ ....... T"T"T'"T"T-'T'-?'"? ....... ?"T"'T"F"F'-~"T"? ........ ;"'? ........ ?"7'¢ ........ ~ ....... .j r'": ........ ?"? ........ ~ ..... ? ............. ==-? ........ !-? ..............
"'T"'T"T"T'"t""F'?'-:'"'? ....... :?"'?'"?'"?'"'I'"?""?"?""; ....... T"'?'"?""Y"T"T"?'"?"",~ ....... .:'""F"F".."'"';' 'T "T"T"? ...... !""r"T "?"T'"; '";"":.'"' ~ ....... ,~""r--~ "'?'.' y"? "F'.,.'"; ? '; ;'" :'-; '~ '"~ ": '; .... ~ '"; "; "t"'t ' .? "?'"':"..!...
,'%f.i..+-.::--,f--?.f--f ....... f..f--?.--y-.t..--?.i-.-y.-? ........ i'-i"%'!'"f"-f-'r"f"~ ....... i"--i--'?--+--f-'y'-f'-'?'--'! ........ ! ........ ~'-'5'-'!'-+'-?---'!"'~"f'"! ....... ?""?'"!'"'~'-'i""?",-f-~-f ....... H:-f ....... ~ .......
--4 -.~---.P-..i....+...,~ ....b...,: ...;- ........ ~....~.....u...c...~....>..-b -.b...;. ........ u...P.-.~...-~.....b...:-...!...-.~-...~ ....... ~....,....b-..b...b...c...P...~....~ ........ ~ ......... L.-b...:.....~....c ...~...~ ............ ~ ....~....L.4--; ....... L-.; ......... ; ........... L-n ............ ; ....................
-.-!.4----i--.H-.-i-H!--.~ ....... i..-.i-.-!.---i..-H--.i.---!---.i ........ i---.i--.-i..H.--H..-H-..I...i.-.H.-H-.-.H...i.4 ........ i..-~.--H--..i..-H..-H ........ /!...-~-...!.-H...i..-.~.---:-,-% ........ i-H?-~=-~ .......
· "+"-+--'H.%-H-H-H..i..--? ....... ~..-H..i.--H.H-H'H-'~'.-.? ....... b-.-k'-H.+-~---H.+-..H-~ ........ b---k-"i""b'-?"'H-?'--'i"-~ ....... H+..-i..-k'-~'--~-'--!...-~,.-~ ........ !--~-'?".'~-.'-~ -"~""~"-'~'.-! ............ ~ ......... ~ ......... m+--!-? ......
2000 "T"T"'?"'FT"F'T'T"! ..... !"T'"F"?"T"T"?'"F"! ........ !""~"T'T'T'T'"F"T'"! ........ F"T'"!'"'FT'"FT"?""! ........ ?'"!'<'";~ ~ ..... ~""?'"'~'"'?~: ""; ......... !--FT-'-~ ........ ; ........
: : : : : ~ : ~ ~ i ~ ~ ~ ~ ~ : ~ ~ I ~ ~ ~ ~ ~ ~ : ~ : ~ ~ ~ ~ ~ ~ : ~ i · : ~ ~ : ~ ~ , . J : : . ~ . ~ , : : : . . : . , ·
"'t-?. "'?-'r -t'"?. '"T'"'F"~ ........ ;.'"'T'-'F"F'I"'T"'T"?'"'~ ....... :.'""~"'T"",7'"!'" ? -"~""V '? ........ ~"",."-'F"~""I'R""Y'T'~ ........ U'T"%"~'"'!""V'T"?'"T .......... ?""b'"b "1 - "F"F"!"'T ....... ?"'?'-'!""; "'t'"!"'t" '? ................. ~'"7 ....... 1 ....................
...~-.-~-..~---~..-$..-~-,-~-..-b..-~ ........ b...P..~....~...~.-..u 4...; ........ i :...~....,._~ ~. ~ ..~...~ ........ ~ .-,m..b...b...b..~ · b-.-; ........ b-..;- - ~..,.L...u...~ .......... ~...~ .... i ....... ; ........ ~. 4 ..~ .......... ~....~ ..... ~ ....
~ ~ ~ : I ~ ~ ~ ~ ~ ~ ~ ~ i i ~ ~ : :: :: ~ ~ ~ ~ i ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ : : ~ ~ ~ . · . : . : · : . : . ~ · · : · · · . . i : , '
, "' :*"~"'t'"t"'~"'?"'?"?"? ....... ?'"?"'? ...... ?'"?"'?'"?"'? ...... ?'"?"'?'"? -'~"'?"",~"'?'"t ........ t"'?"?"?'" ,"'?"'?"'?'"? ........ ~"'?'"?"' .~'"'P"~ "'t'"?'"'? ...... ~"'~'"'i'"~""i"'+'"~'" .4"'~''' t"'?-'?'"~"'~ "'~'-? ........... ~ ........
--+.+.4--4.4.-4--.~.-.H?: ....... H-!.--H-!..-H-b-HHH...4.-+-HH.*'---.b-HH~ ........ i--!-!..-.b4..4.--HH~ ....... h..;--~..-~.-.-!....!.-4-.-,!.--~ ...... H?'....!....L-.-!-..H.i..4...~ ....... ~-4H-!-4-4-~-H~ ........
-'-?H'"+-.i----W-H!---',- ....... HW--W.-i-.-'*..----!..+---i-! ...... ';,-.-H.-..i--H,-...W-H ....... H..+--.i.--f..-W.,i.--.i--H-.-i.-..i--.-~.-.H...-i-...i.-..i.--..i .... W..i--..i....i..4....i--W-i--i-k.-i--i--i--?-~-%b+-.; ........
· ",-+"?:'"H't'"H't'"H-~ ....... !"'H'H-'~'--t' ---t' ,-'H"k,--? ....... H --k"H'H'H"~"'H'H"} ........ ?"-5"-'b"~"'H'%"i""i'"~ ....... H-';"-'!-..';'--H'H-H '-i".-? ....... -b.'H..?.'H 4""b-H-?'-'H'H'~' 4- 5--~- +-H-r-H-; .......
...L..~..,~.-.L.4-.~...L-~...~ ........ h...L.~..-,i...~....;.,,~..-.L.,~ ....... ~...,b.-~.-.L..L.,~....~.,.~...~ ....... ~-.;,..,L.~-..L..~....b.~..,-~ ........ ;...~....h..~,...i...~.,..L.~.,..i ...... ~ ......... L..L2....k,.~...L-; ...... I ;-;--L-h.4 ........ ~_L.~ ........
.4..4...h..L.b.b~...H ....... ;.--.~..-->--b..i....i..4.4....; ...... ~....i...H!..-b-H;.4...~ ........ b.H.--.b.-i...~-.-b..b-; ....... b--b--!...Hi..-.i..-H....; ....... ;...Hb4...I.4....!.4.4 ....... i4-H-4. +4-?-~ .......
-~!~f~H'~f.i~i~.+~.-t~!~f~i-r~i~..`:.~i~f~i~i~.~f~i~.?`~.!~.~k~i~i..~f ....... i'"f'--?'-?---f-'f'i'--'i-'-~ ....... ?-"t-f"'f'-'?"-?'"!'---i'"'! ....... H""!"-'i'"i'"!"-'i'"!"'f ....... i'+-7!-+%~--i-? .......
"'T-'?"'T'"T'"*'"?'"?'-F'~ ...... ?""Y'"F'?"T'"F"F'?-'? ...... ?'"'Y"?'"?'"*'"'~""F"?"",~! ......... ~][ :~'"?"'?'"'~"'?'"T""F"~ ....... F'?'"'F'?"'~"'?"'?'"?""~ ........ ;'"?"'?""!'"'I"",~"-FT' T ....... ?-?-?-7 ....... ?-T-?-T .......
"?' --H' .+-+-H'H'+"'H'H" -'~"'+"'H'%'~ --H'?' '"H'~ ...... H-~"%'+"'~'"'k"~'-'H'~'- "~'.'-?"~"'H-~"'H'-k--H'+ ...... H'H-H-H"b'.H--i...H.+ ....... ?H'H'H'f"H'H"i"-? ...... H'~ "'H'H'~'-'?Hff-+ ......
--:,--4-;...;--~....*---.*...;..4....--.'.--;.-;.-.;.4..;.-4-;-; ...... ;...;-;...;-.~...;.4...;...;. LL,~...L;...4...;-.L4.,..~ ....... ;...;.-~--?'"..+.-~....L..i-8 ....... H...~..8-4..4...~...;..~ ......
--t -?..-?.--?--?--?.-.? --?---? ....... ?.-'?-,-?,.-.,~-.-t .--?-.-?'--?.--?--- --?-.-?---? - -~.--?---?-,.?.-.7.--? ....... ?.---t---?..-?.--?.-? -?...?.-.? ........ P..? - ..~...?-..t ..-?-.--'..'.--?...? ...... ?...?--.?..-.~.-..P..~...? .--?... t ....... ~..-?.,.?.-..t...; ..-y..?...~,.-.~ ........ ~,,..~--.,.-.,~ .......
o --f--i--i'--f.-.t--i'-'f-.f..f ....... f--f-'?--'i-..i-.-f..?'!--f ...... f"f"f'"f"t'--'i--+"f'-f'::"f~k-f-?'-'i---+ ....... f--f--;.:...+..-i..+.-H..-t.~...+'..H...f.-[.-+--..!-..f.--f ...... 5...t.-.f...f..-f.-?.%i .......
--z..4...Li..bL.Li..Z ........ L..L.i...L.L...L...i...L.i ....... ....... ...... L!...;,..Lb...¢...L$ .......
:::::::::::::::::::::::::::::::::: :::::::::::::::::::::::::::::::::::::: ::::::::::::::::::::::::::::::::::: :::::::::::::::::::::::::::::::::::::::: ::::::::::::::::::::::::::::::::::::::: :::::::::::::::::::::::
..... ....... ....... ....... ...... f:!::?< :::::::::::::::::::::::::::::::::::::::
..... .~ ........................................... ~ ....................................... , ........ , ...................... :u...~i.,~,oc~..;...~ .................................................................................................................
-,.L-b..L,~-.-i---.L4...4-.-.:.'---i.-.~---H..-b-H....b4..-.f ...... f....!..4....L.¢....b..b..L.~ ....... 4....i....b..;x:b..~...+ ...... ;...,]..4..4....b4--..L.b.4 ....... -L4....!...~,....b..f...,]...h.~, ....... H~.-4....b4-H-+4 .......
-, aaa ::::::::::::::::::::::::: ::::::::::::::::::::::::::::: :::::::::::::::::::::::::::::::::::::: :::::::::::::::::::::::::::::::::::: :::::::::::::::::::::::::::::::::::::: ::::::::::::::::::::::::::::::::::::: ::::::::::::::::::::::::::::::::::::::
i...!..j i !.j....L_i....[ [ i..LL [i..iii!iii: t i :,,,,.i i! i li!J;i!i i iiiii ,,L ......
-4..4....LH.4....L.L~ ..... i.4-4....H..4...+'-.L.i ...... L.~...;...;..4...L..L.L~-.i...L.~.-~...L.i...L.L,i-.~....~i..4...L4...;...LL..~ ....... L.LL.L.4...L.L.L..; ....... L..L..i...L4...~-.L..:...~ ......
-4..4.4.---4.-4-L4..-4...4 ..... 4-.~...4...HH4...H4...4 ...... 4~-4-"4...4...H~..-L..4-4.~.~...4....L...~..4.4...L.L.~-.`*.......4:~.4...L.4...4...L.L.:~ ....... LL.L.L..b..i...L.L..i...:...L..L.L.4...4..4...4...4...i ....... !....b-b-4--.!-..L--.b.4-.-4-.-
-.~-4...¢...¢...~...~...~...~..4 ..... ~..¢....~....p4..4...~.....L...~ ...... :..~...¢...~....~..! ~ ¢...¢...~.~ ~ [.i. 4 ~ ~ [~ ..... h-i~.....4. Pi ~ i ~ .~ --{ ~ [ ~ ~.-{ ~ ~ : ~...*..~ ~ ;...;.-..;- ¢ 4 ~ 4..¢.4..
--i--4.--i.-4..4...4-L-~--~.-...4..4.-4.4--H--4.-.4-4 ....... 4.-..b4-4-.i..4--.Lb.L ..4---~--..i-i...H-4-i.4...~,--~-..4..-i...?'.%L.~.i ....... bi.-.~-.~-..L;--.i-..~.4..-~...i;..~...4...L.4..-Li.-.Li ...... ~...i-.-L.i.-~.~.-.b~...L.
--*-.-?-4-~.-.H4---~.-.¢...;......4-4--L..~____+_ __ ....... h-..b..¢...-b.....~..-¢.,-¢.-.~.-.~....b.;...;..,¢ ...... ¢..4.-.b.4--.H 4...;....';-¢ ....... ;...;..4..,.;~4..i;...i...¢..4 ....... ¢...i...~...~...J...;...~..; "';'"t .,.¢-4-4-4-4-4-4-~-; .......
· 4-.:.:..44.+.b4.4'.4 ....... ;:...?:--,5.bbb.i....H....-4....i-..H...bbb.~..,.~ ..... b::..4..4-..~...~..4...~...b.....Lb-~...~'.:'~,:b.~-.~ ....... bbi...~...H...H4...~4...bbLi...4...b:.'...; ......
-t--t--t--t:-+.t..-t.+-t ....... i-"?-!"-t'"t-'-i--"i ...... t...t-%t..-t---t--t..-t... "':.:-'f"f'~"'f-'~-'H'"..+ ........ ...... t"'t"'t'"t'"?t"'t'"t ...... '''
2000
-..L+..H;-.LH-..;..-~ ...... +...H...+...*%b+...;....b.~...H..4....!...*'....;..4...+....~"....4...H....H.4...b4....; ...... ~--4..4...~4 ....... :b4..4...:~.4...H...H ....... H...H...H...+...H ........ i...~
..~JJ.~JJJ~ JJ J* ...... ~.J J~JJJ*J.J~ ....... ~,..~JJ~ JJ J J~ J..~ J..~ J J J.~ JJJ~ JJ J~ ...... ~ ....... ~ J J . + ...... ~ J } *iJl~ ....... ~iI ~ i4 J.l~ll i ~ ~ 4 ~III ~ ~ ~ ~.I 4 4 i~ ' . i ~ ~ ~ J J }i li~ i i~i i~ i ~ i~ J J J~ JlllJll.~ Jllt .i l~liJ~lJ J¢ i.i~ ............... a Jlil~ J. J~.l l~.i ~ J.l. J J i~ ....
-.,...,...,-,...,-?--~...,..4 ....... ,....,...,...~..4...,...,....~...., ....... ,....,..,....~...,...,...,...,...,......,...,...~..., ....... ,...,...,...~ ...... ~...,...,...Li....:~.1%..,~....4...,...,...,_.1...,; ....... ~..., ..... ,..., ............ ,....~ ...... .~...~ .....................
-3000 -?"t:'"':,-t-r?'t'"?t ....... ??"t-?'t'"?' -?'?'Ft"?"?"t"" ?t'"r?T't-~-'t-"t-'?-i-'t'~':+',J"":"t"'t--t-?t"t"'t'?'t ...... t'"t'-'?t'"?? ...... ?-?'"f"?-'t'?'t ....
-r-.,,.--?-t...t.-%%--t ....... t..-t.--t..-t-.-t-.t--.?'...t...t ...... t-.?t--.t-t---t---?-t ..... .-:---?%?.?t...-.: ...... .t--.t...t--+.-f-.t..-t...t.-.t~ ~ ~ I J J: ~ J 0 e~ ~ ' ' ' * ' J I t ' ' 't ..... t"'t'"Y"?'"{"'~"'Y"t"'~ ...... ~'"~'"t'"*'"!"'~'"~"'t'"~ ....
...... + ' J ' '} '' + ' '+ ' ' ' t J' ' 41 - 14 · -- 4 · · - J~ ...... 4-.4.~-.4-.f...4..4-4-.+~--.4-.~.4..4-~-4..4...4-+ ..... 4...4-.4...4.4....i...4...4...4....\¥.+...4....i.4....b..!...?'...~ ...... 4...4....;...+...?..,:'...4...; ...... +....b-4.-.4...b.H.-+-.4...
"T"7"'T'"T"T"T"T ....... ? ....... T"T ....... ?}"T'T"T'T" 'T'T"T"'T'T'T"T-T-'F"-T'-FT"T'"T"T'T"T"T ....... T'T"T"T-T"'T"T"7"? ...... TJJJT'JJJ}JJJ'[JJJJ~'JJ'['"'~"JJf"J? ....... ~ J J ' ~ ' J' '' ' j ' ? ....... ? J' ' ~ j ' ' '} '' ' '~ ........ ~ J' J J[ ' j j '~ J' J J~' J J ? J' J ~ J' J J~ J J J '~ ' J J ~ J J J
"T'T"T"T'~"T"T'T'"! ........ ['J J'[ J' JT JJJl T J ' ' J~ ' J J J[ ' J J T J ' ' 'f ....... T-FT"T"T"T'T"T"T .... F'?."T'TT'T"T"'T'"T ....... ?"?F'T ~ ~ ~ ~ ~ .... [""[""~'"'[ '"T'i''~''''~''''['''T .... ;JJJT'JJTJJ"~"JJ~ : : ~ :
-4000 'IT'I: i, : : ~ i i i ~J~JJJTJJJ?-JtJ'J?JJJ~JJJ?JJJ? ....... ? JJJ~JJJJ~ J J J? JJ~JJJJ}JJJTJJJTJ'Jt JJJ [ J ~ ! J ~ : [ ~ '"~'"~'"'? '"? "'~'"'? '"? "'?" '?'"" [~i[J:][{ ~::[1~:~: -?" ?"?' "'? -'~"~'-'?"?-'? ........ ! : : ~ ! ~ { : :}'"? ....... ?'"+' '"?"'?"?'"~ ..... ?"'?'"?"'?'"'.~"'7'"'}"'7[: i i [ i ] ~'"* ....... ?,,?,-.ti: , ] ; [ ~ ' ]"'? '" '~'"7" '*"'7 "'7 ........
-T-T-T-T-T'"T-T"T"T ....... .?"T'T"T"T"?'r"T-'r: ..... t"'?-T",:'-t""~-."-r".'.' .... 'mt,'"r"t,,-t"'?"'r":'r"? ....... T'T"T'"T'"T"'T"T"'r'"~ ....... T"'T" ~'T'T"?'"T'"T"'T ....... ?'"T-T"'?'"T'"T-?'"T""~ ........ !"?"'T"T"T"'T"T"?-'T"'
---~-4..-~-.-.h.-~---~...~-.-~.--~-.~ ...~...~...-i...~...~..-~...~...~...~ ...... i....h..~-.~...~...~...~...: ...~.-...~... !....;.-.~..-~-~...~... :...~ ....... ~--~...~..-.h..{...~.--~.--4-.-~ ....... ~...~...~...~...~....~...~...i ........... ~....h..~....i....i ........ a...~...~ ....... ~...~...i....h..l...~...~....L..~...
~E.L.L.LL.L.i...L..L.LL.LL..L.L.i ...... LLL.i...i...L.L.L..L.'...i....!-L.,L..L.!-L..L..i ....... L.i...iZ..i...i....i....L.i ........ i....i.._L....L.i.,~...]~]ZE~.-.]~;]...-.:,];
J S 0 0 0 --J~'JJ~ J' JJ~ J J JJ~J J JJ j J J J+ JJ'~ J' J J~ JJ J J~ JJ' J' J J J~ J J J'~ J J J J~ J J J J~ J J J j J J J J~ JJ J J~ J ' J J~ J J J J~ ........ } J J J J~ J J' ~ J' J J} J J ' j J J J J} J J J~ J J J J~ J J J+ ....... !'"'}'"'!'"'! "'j ""! "' +'"'!"'! ........ !'"'}""!'"'~'"'j'"'!'"'!""!'"'i ....... ~ J J J'~ J J J J~ J J'J}' J J j JJ JJ~J J J J'~ J J JJ~ J J J ~ JJ J ~ J J J '~ JJ J ~ J J J J~ J J J'~ J' J Jj }' J ~JJJJ~'JJJ~ JJJ~ ...... ~ J J J J} J J'~ J J ' J~ J' J Jj J J ' J~ J J J J~'J J J~J J J J J~J JJ J
-~000 -~000 - 1000 0 1000 ~000 3000 4000 ~000
WI-LL' b-Zq. II I-I~-I I-I~
(2703'SNL & 197_4~EL, S12,TllN,R13E)
v- 'TICAL PROJECTION
-2000 - 1000 0 0 1000 2000 9000 4000 SO0O
.... ?----~-.-?...?---i..--? ........ r-.? ........... ..----.¢-.-.~ .,'...-?----?-.-T-.-? ........ ?...? ........ ,--.i-.---?--..; ....... ~ -'-?-'-~--"~--'-?"'1----,,'---?----:'""~ ....... ~'-? ............ ?--'-?'---r--'~-'-:'"'r ...... 5"".'-'--;--"i-"i""i
J' : : : ~" : : : : : : : ! : : : : : : : i t ' : : ~ : : : :--$--.-~..--~..-?:: ' : : : ! ~ : : :...i.-.J-,.-~...~~ i : : · j, : : : : : · : ~ ~ .
"' ??---.?"--~-'--: --..~.,-.~--.?.--? ...... !.-...?-. -.-.-.-:..-.? .- -:..-.,? .--?., .-, ....... ~,...:.----, ........ ,--..:-.-.?.---,.-.-~ .... ~-..?..-.~---.~ ....... ?'.-?..-?.--? ....... ,: ..-?-...~.--?...-~..,.~..-? ....P-..:' ....... y--?....~-.-.~...,--.-~..
· ~.--i.-.~.--~--.!---i-,.~.--L--~ ...... L..L...L-~ ...... L..L..L...~ ...... L..L.~....i,..L...L...L..L..L..I...L..L...i...L...I....!....~ ....... ~ ...... L..L...!.,..;..J ........ ;....!....; ........ ~ ............ i...i...;..
: : : : , ~ : ~ ~ ~ : ~ ~ ~ : : : : : : · , . : : : : : : : : : : ~ , : : : : ~ : : : : . : ~ . ~ : : : : : , :
......... ~""i-"¢'"'..'"'.~ ........ ~'"'~ ...... ?'"'m,'--",~"-,---f"-f"-'i--"f ........ ~!"~-~i~!~!~i~?~"i~!~r~+~i~;~!~!~i~.~i~.~i~!~; ....... ~..-5...i..-f...t-.+,+-.;...5 ....... ?...;...~ ....... f"7-':'"';'"-!+'"!
· --f-f'..f'-+.+.+.'-!'"'i'--5 ...... ,:-.+-+-+-+-+-+-+-+-.4..+--.~.---! ......... i..--~..-.~..+-.5 ........ i.,+-5.-+--.!---~..-.i.-.~---$ ....... .~..-?'-.-$..-.i.-..F...i..-.:....~....~ ....... :...-~..-.~.-.-;.-4....~.,.-;-...~-...; ....... :....; .........
· .-?'.-.-?...5-..-i---.!..-~.--5.---?---~ ............ ~..-.~..4--4.-..i---.i.---!.---! ....... i-.--i-.-.i-..-~----F--~-..-i-.+--.! ...... ~..--?-.--.i.-..i.---i....~....i...-~ ........ i....:....~....~....L..i....L...i...~ ........ ;....;....L..L-i-~--~-;-J
~-4-~---,;...-i-.-;-4.-.-b-.~--i ....... ~.-.~--.~-.,~.-.~...~.--~-...~..4 ...... ~...~..4...~..4...;..-L..;...~ ...... L...;....L..~...,~...L..;...L.,.i-.~...~...~...L..L..L..L..~...L..~ ...... ~....~....;...L..~...L..L..L...i ...........
~...~...i...~...~...:....L..~....L ....... ~....~...i....L..i....L..~,...L..L : ~ ~ : i i [ ! ~ ~ ~ i !. [ i [ i. ! i i ; , ~ ! ; ~ ~ ~ ~ i ~ :
· ~~~- ~!ii!!~ 'i ...... T~n~!"T'"i'"'!"'T ....... 7'i"T"~""['~i'"?":i"~:::"!'"?T:.'""i-'? ....... ;"~'-~'T'-'""~::~""~""i""i .......
'-?"--i.--'i'-' '!'--? +..-'-! '--'~'--.i ....... f---i..-~-.--.i---f... 'i'.. +,'-?.--? .....~i.-.i.--.i.--+.-.i---~'-+"?--' .i'.-.i ........ !... +..-~.--~,.--.i... +.-.-i.--.i--, '~ ....... ~'--+"' '~"-~'.-.F-,i-..-~-...i.--+..... +..~---~ ... ~,.-~-
-'t'-.'?""i""}"'t'"'b'"?'"'}"-'?'" "~'"5"'5"'5'"t'"?:'"5 ....... 5'" ':~'-?'"?"5 ........ ?'-'~""~"'5 ....... :~'"5'"5'-'~'"'.t ....... 5'";"'+ ....... .:'"'5'-'5"'%'.4.""i'"5"'4.'"5 ....... 'F"-~'"-'~'"'-;'-'~ ....... '~"-.'?'"-"
.... !-..-!.--~-.--i---L-..~--..~...-~..-.~ ....... ~ .-..~..--;.---~--.~-.-~...;--.-~,..--~ ...... ,-~4 ....~....~.,-;--..~.,..~....;.--.~ ....... ~....~....~....~....L..4...-.~...-L..~ ........ ~...~...~....~..-.L...~....i....L...~ ....... :...~....L...L.-~....L.4-4
"'-~""~'"?"-'~'--~'--~-'"~l, ...... ~"-~""~"-';"'~'"'~-"-;"--;'---~ ...... -..~N-~ooo;..'-' .:~ ~ -~.--.~ ................... ....... ~----~-.-.~.---~--.-~-..-~---;..--~.--~ ........ ;--.-;..-.;....~..-.~--.~.-..;.---;.--.~- ....... :-'VERT ..................... ! ¢~L SE~t~-.:ON' ...... '-.' .... ; ......
.... ~--+.+.-+...+-~-+.+.+-..--+.+.+-+-+.+-.;--4--..i-.. L4--.-~..4.~-i....i....~...5 ........ i..-.i--.-~--.-~--+--.!....~--..i.-..i ....... ~.--.~.-.-i.-.-i..+..-~..4..-.!.-..~ ....... -}....~..-,:---.i...~...-~....i..~...-~ ......
f-'?:'"~-'--i-'-f.'i--,5'.'-'~-'-i ........ i"'-!'-'-i---!"i"-'i'"'i--'~----! ........ i'"~""i'"'!"i'"!'";'"'-/'i ......... i'-'-F"F-.:.'-+'"!'"~:"--i"--! ...... ~--..i-..~..-.k-.F..i-...~..-.i.--.~ ........ ~.-..;-.+.+-..i-.+-.~-?-;
::::::::::::::::::::::::::::::::::::: ::::::::::::::::::::::::::::::::::::: :::::::::::::::::::::::::::::::::::::::::::::::::: ::::::::::::::::::::::::::::::::::: ::::::::::::::::::::::::::::::::::::: ::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::
: ~ ~ ~ ! i ~ : : : : : ~ ! ~ : ; ~ ~ : : ~ ? ~ : ~'N.. ~ / "' : J : :
-T-.L.LL.i...L.L.i....i ....... L.L.L..L..i.~..~...L.~"..;..~..~L.L~..]...L~...L.:...~...~.~.-;...L~i...~i..~L.L~: ...... L..L.L.L..L.;."...!.....i..L....-~...L.;...L.i...L.L.L'.i ......
· -f'-i---f---f---f--f.--f-i---.i ...... f'+--i---'i---f'---i'--'i-'~i-----'l~nh'hf--'!---'!"-'i-"i-'-~~~-i'"f ....... !"'-ri'"'f---f'--f--f'-'f"-'! ....... !'"'i"'i---'i'i'-'f'"f'--f'"'! ....... f'"f"i"'f'-'!"'t"";'"'?f ......
--i.-.i...~...i...L.L.i..-i..--i ...... !...!...L.L.i....i....i.~ ..... i...~....;....i.-.L.!,....i...i..4 ....... !....i-.~.~.~".i.~.!.....~.~.~...i....~A.4...~...~..;...L.~...i...:...-!...L.i...!...~..~!~.~; -..~...~...i....!...!...;...~....!-i
--..*....+--+..i-.+-.,.:--+-.~..--~ ...... ..;.-..F+--.i--+.-.~--.,bi~ ....... .~:....!...~....~+..~..~+....;-~...~..~....+...+...f.?....i.~.~!~.~.i-~-..x.k.i``.¥.¥H.~...:..+..~.~.:~..I.~.~..~?......:-.f..F.~....;~..+~ ...~--.~...-~....i...,:.-.~..-.i-.+--~
-'f-'+'"5'".-.-f..4---,?----?-.~ ...... 5'"'?"5"-~"'~"'f'-';- .~.?'-" .--~-..~..-~----~-.-,~...5..-~-.;--~ ....... ;-4...;....~-.;.,.~...;...~...; ....... ~...~...~...;...4....~...~...;...~.., ....~...~...;,..;...~...;...;...~...~......-~...;...~....~...~...~
--f-..f--?..!-+.i.--.i.--.i--..!---,..i---.!--.?-.~-.-f.-.?--i.~i ....... i...i...i.-.-i..+--f-.-i:--i---f-.,..%..+.--i---!.,.~.-.i.--i,...~ ....... ½~4--~...i..--;..-~,...r-.i--:i--.!,..~-.-i--.i---~...i...~ ....... ~-.+..-i.?..f...i..-:,...~..-i .......
::::::::::::::::::::::::::::::::: ::::::::::::::::::::::::::::::::::: ::::::::::::::::::::::::::::::::::::::::: ::::::::::::::::::::::::::::::::::::: :::i:::;:::i::~:~:..~... :::::::::::::::::::::::::::::::::::: :::::::::::::::::::::::::::::::::::::::::
· ..~...~...;...~..4...~...;....~....~ ...... ;...~,....;...;.-.~...~....;..~-~.,.~, ........ ~.4,.-;....~....;....~....;-~.--~ ....... ~...~.-..;...~...~...~....;....;-.~ ....... ;...L..~...~...L.J,...L-~...,...:':,....L.4....L..L..L..L..~...~ ........
'?"'?'"?"?'"T-'?'"!'--t -?~ ~ .... ~ ~ i ...... ?"'? -".~ "'? - ?'" 4." '5 "~'~ ! ~ ~ : ] ! ~ . ! ....... ~]l']n?:: ~ :' . -.?...+..~-.?... ,- .;...?-4....~- .~...~...;...+...; ~ ! ! i ! i i ::~ ...... ~.._ ;...; ...~....T....~ ...4.....~ ..4... ~i ii. i~i ~ i_o~ii
...i-.i...i-..i..-~...i....i...i...~ ....... ~....i....L-i.-4....L..i..~i ........ i...L..!....i.-.~....!....i....i....i ........ i....i....i...~....i....i....i....!...i ....... .i-.i...~..-i-..i....i...~....i....i ........ i..~...~..~...i....i...~....
.-i-i-4..4-.~-.i-;-L.i ....... i...i-.i..-i...~-..~...i~...,-..:::...i-.i...i..,..i...i-.;..'...i .... i...~...L.L.L.LL.!...i-'..-LL.L.L.I...L.i...i...i ....... i..~~.: ~.i...;.,...o.~..~..s.i...i4...; .......
.-4-4...i...~-.~-.~-,~...;..-~ ...... ~...~....~....~...L..~-.4.~...t...~...~-..~...~...I...~...~...~...~ ....... ;...~....;...~..4...~..4.-.~.-.~ ...... ~..4...~..-;..+...~....~....~...~ ....... ~...L..L..~...f..L...;...~..4...
.... ~-4....i-~..-½-..L.4...;:....i ....... 4--4-+:---4...:,'...4-.4..-~:---~-.L..-~---4-.-!,.-.L4..4-4-.-4--...4.-4...4-4-.4-...~..-4..--~-..4 ...... 4...4.-.4-.-4..+-4-4--.4...~........4---4..-~.4..-+-;:'...4-.~...4 ...... 4.--=.-.'..-4...4,.-~.....i...4..-4...~ .......
. ~-4..4..~...' 4. · . t ....... ~..4-4 -4..4...~. ~, ..... ~...~. ' : '~ ~:] 1']1']~..'::: ~ ': .................. ':' ~' '~:': ' ~- ....... ~ ~ ~ ~ ~-~ ~ ?: ~-i.. ~. ~ * '; ~ ~ r: ~ ': ?': ~ ~ ??:: :-~
""t-'t"'t-'t"'t'"t"'t-'t-"i ...... t"'t""i'":~"'t'"t'"t'"?'"t ....... i--.t...t..-?--.t-~'...?--}...+ ....... ~..--}-...i.-+--h.i--+...}--.+,..r...?.-+--?.-i...}--+..+-..}-...i ...... +-'-+-.f-'t---t-"f..+-"+"-+ .......
'-?'"..'-'..'"'T.'"'T-T"'m'-7-'"?-'T"'?"T"'t'"T-"7'?.'.' ...... t'"t"'t'"t"'T-'t'"'i-t"'t-'-'t'"t-'t'"t"'t"'t"t'"~'"t ....... t'-t'"t'"t"t"'t'"t--~-'~ ....... t"'m:"'t"t"~'"t"'t"?: ....... t-'~'"t'"t"'t"t"'t"'t""i .......
'"T'"T"T"T-+.-'T'"T-'t"'T'''' -'T'"?"?"'T-T'"?'"T-'?""~ ...... ?'"?"'T-'?'"T"'?'"T"?-'T ....... T"'?"'?"'?"'~'"?-'?'"?'"T ....... T'"T'"?'"T ....... T'"?"'?'"T "".+.'"f"f 'T ...... T' f"T"'f ....... T-'?"'T'":' ....... T"'r'"..'""~ .......
-..4--;...;-.;-...[.-~ ~ ! i ! ;' ..... '~"';'""~ ..... 4..-~.....~..~. i ~ '~ i i i ~" ~ ';"';" '~i ? i i ~ :: ~ i'~'""~""~' t-"~'"4. '~'"~-" 4.1 i ~ 1 I'~""~"'4. ...... ..... .~--; ;-- 4 :-~-~ .~ -~ 4 4 ~ ~ '~i ~' it~ '~ ;' ~ : i : ~ ! :: i'; '~ ~' ;' ~ ......... "+
---'~...-~--.-~...~--~.-.~-.--~..-.-~....i.-..-.4--.~.---~-..i--~,.-.~..---~.-..i...-~ ...... ~....i...~.....~...-Jr-.-L...~....L...~ ....... ~..4...~,...-;...-~...~-...-~....~...~ .... i....~...-L...L...L...L...L.-L...~...-....i.....i....~.-i...L..~....~....-;....; .......
--~,-.-4-..4-4-4-.-~-.~---L..-; ....... 4--~.--~-...i--4-...~-..~---4--..i ........ i.-.4-4.---~.-4--..~-.-4.--~---:~---~..-4--4...4.--L.+--.~..-4.--.!--i .... 4...4.-.4--..i...-!.-..L..~...4..-4 ....... 4..-.i..-4....i..-4.--~.-.4...L..4 .......
--~-4-4-4...~.-4-.~...~---~ ....... ;...~...~...~...L-.~...~.-~,.-4 ..... ~,...~..4..4...,t...~...~..4- 4-- ..4...~...~...~,-~...~ -~...~..4 ...... ~- ~...~..4..-J,-..~-~...; -~, ....... ~...~...~-.~...{-.~.-~,..i...; ...... ~...;...~...~.,.,L..;...~...~...a...
: : : : ~ : : : : : : ' ' : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : : ~ : : : : : : I : : : :
-.-i.--.i.-..;~-i..--}--;.--i.~--;-..4 4---;--:, -~.-,J----4 .i.-;..--;.- -;--' -' -' -; ~-.4-;--,-4 ~ 4-4-], 4.-4-4. -i. ; .:, -;. ; J. 4 ~. -;..i.. ;, ; ;-4. J.
-?-'T"'T"'.?"~"'T"'?"~'"?'''~ "'?"'?"'?"'~"'~.-T'"?"'T-"~ ...... T'"?"'T"T"t-T'"T"'?"T'" -'T..'"~'?"'T-'T-T-T"'?'"? ....... ?-?'"?"'T"'~'"??"'T"'?'"i '"?-':"'?"'T'"t'"?-+."'T'''? ....... ?"'T"'?'"?'"?"T'"? ....... T'"
--f '--+--+--:+-"+--'+--'+.'-+'-"F--~ ----F..+..- .;.--5-.+-.+----?.-5.---? ...... +..+--+.--?.-+--+---?-~.-.+"- '...;-~.-~~-+ -.-F..~-'+.-..~--'~ ..... ?"-~-.--~'"+"-?'-'"~.--?"5'--5 ...... -~---}...-;.-.+---~'-.~...'~."~-'--~ ....... +-'~;"'5"'? '"+"'5" +-~-5 .......
"'~"-'~""L"~'"'4"'~'"':;'"t-";"' ""i"'";'"~'"';'-'{'"'~'""~"~'"'~'i ~ i i ~ i ! ~ ! 1 i i i i ! i i ! i ..... .i i ~ i , i i i ;~ -;-~,..-~ 4-.;---;-4-4-. -~,-4.4..4--~i ~ i i . ~ ~ i i4-+ ~'-~,- -~,--;~ i ~ ~ ~ , ~ : : t ~ ~ i ~ ~ ~ ~ : · ~' ~' ~ 4-4--~ ~- -} :; ~ -} *~ -} 4 + ; ;"-+';:: : . : ~ : :~""} .i...~...-~ 4...-}...
"T'T"T"'T'"?"'T'-F"T'"!-'q '"?'"T'-~'"'~'"?"'T"'?"'T-'~ ...... ?T"'T""?'?"T'T"T-T" 'T'T"T"?T-~"T'T":.' ....... T'-T"'T-'T'"~"T'"F'T"'? ...... ?'"T"5'"'~'"T"'T-'T"'T"'? ........ :'"'!"";"","'T"'T'"'m?"? .......
"'?-'?"T"?'"?'"?"":""".-"""~ ....... ~"'?"'T""~""~'"'F'"?"?""? ........ ?'"T"":.'""i i : : : : "T"T""..'"'? .......'1' ~"'?"'?"".. ....... ?"'?"":'""~""~'"?'"'~""!""~ ...... ?'"T'"'~'"?'"?'"';""~"":""; ........
--5 -.+-.-?' --.+-.-+--?----b..+-..? ...... ..?---~-.-5-.-.F-..F...i..-.F.-.F---? ...... %.?---5--.-F.-t -- .-i'-.-~.-.+--%- -.+.' .-?--+-.~.-~-.+-..?--5 ....... +.-.5--..?-'5'..~..--b-,5...5...5 ....... 5...+-.-5.-.,~-.-~t.---b.
..i.--i.-i..-:?-.i-.i....i-.-?.-?...'.-.+.-.'~-.-?.--?.+..!.---i.-.!...~ ....... ir~n.~!.-!--i--i-.-~--?i--f-i--?.+....4-i-..:.. ....... i'"?"?'"?i"i'"'i ....... i"'!"i'"~'"i'"~""?'",
i i i i i i i i i i i i j i i i i i i ! i i i i i i i i i i_} i i i I I i ~ ~I h.; i .~.i i ~.+.~ ..h..,...~ ~....h...:, ..... ~...,L...i...~....~ .......
"T-.*.'"~"'.T"'{"T'T"T"":.' ...... T"'T"T"".r"!'"T'"'?:'""~-:""?"'?-".r"?'-]'"'?'?-"~"'? ....... t-'?"'T"'T' ""~"'t'"?'"T'"'"?-?"'?""?'~""~'"'~ '!"'~: ...... T'"~'"'~""~", "T"'T" ?
"T'"t'" :*'"?"'+.. "'~"'~'"? '"~ ....... ?"~-"~"':b"~"'T'"'.~'"? ""~ ....... ?'"~"'~"'?"'¢"'T'"'i"-?"? ...... *: -' ..*"'~"'~'-P"?~'- ?' '"~ ....... ~"~""! ........ r'"i'"~"'?'"'~ ....... ?""i'"T' '"'~"' ..*'"? ....... ?'"?'"t"'?
.... ~'"-5'-';,--'-;;-'--?-'-'~---4.-'".5--'-~ ........ ~"'5""~'-'4.--'~'"'~'"-~"'4.'"'~ ........ ~---4."'-~-'--~'-'~-"4.-";'"-~'-'~' ....... ~---.~..'4...--~.-.-F-..~.'"~..-.;'-..4...,~ '"'~'"4."-'~'"5"--~""~-"5"--~-'"~ ...... ;.'""F"?"?'-i--~--?-'~--i
--i-'!-+--.+--'f--"i'-'-i--'?-'-! ....... ~"i--'/'i"'f--'~"-i'-'i'--i ....... !-'-~-"-i'---i"'f-'~---'i"'i"-~ ....... i....i....i..i..~.;....i.~...~.~.~..~...~...~..~..i....i....~.~..i....i....~ ....... .~"'~"i'"'?"?'-i"-'i-'"!'"'i
........ ....... ....... ::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::
.... k..+:'...i.--~.-.-i-..+.--.~.--.!.--.i ....... .~....i..../4...4....i....;....;.~.`i...:....i....?.:..~+....i..~f...i....}....~...~... ...?.}....i....i..~.}.~.4....i....~...4...q...+...4~..;...~b..~}....i...4....i....;
SO00
14S.
PROJECTION ON VERTICAL PLANE 14S. - 92S. SCALEO IN VERTICAL OEPTHS HORIZ SCALE = 1/I000 IN/FT
Form to be inserted in each?', _~..:tive" well folder to check
for timely compliance Vi'th our regulations.
OPERATOR', WELL NAME AND NUMBER,
Required Date Received Remarks
......... .,~,- ,~,.-,~ .....
Completion Report k~/V ~f~ ~c~--
0. ......
Well History ~e¢ / -- /¢'--' ~7 .,~l~ .....
_ . . , .
, . , , , , , . , , ........
....... , ..., ,
, .....
Core Description
.....
Inclination Survey
.........
Directi°nal Survey
..... [ ~1 ~ ~ / '''
Drill Stem Zest Reports'.~d/~
, . ..... , .
Production Test Reports
......
~ .... , , , t ,, ,, ,, , , ,
, , , , , ..... ,
Standard Alasha
Produclion Company
900 East Ben$on Bouleva.
PO. Box 196612
Anchorage. Alaska 99519-6612
(907) 564-51 I I
INDEXED
DALLAS
ARCO.
CHEVRON
EXXON
TO: TEXACO
MARATHON
MOBIL
PHILLIPS
STATE OF ALASKA
GEOSCIENCES
REFERENCE:
STANDARD
ALASKA PRODUCTION
Dote: 01/05/87
t#: 77643
SAPC OPEN HOLE FINAL LOGS
The following material is being submitted herewith. Please acknowledge receipt by
signing a copy of this letter and returning It to thls office:
DAL/UNIT/STATE:
G-24 DIL/SFL 12/16/86 //1 9492-10470 Sch 5" & 2"
G-24 BHCS 12/i6/86 //1 9492-10470 Sch 5" & 2"
G-24 ~- CNL/GR-poro 12/16/86 //1 9492-10470 Sch 5" & 2"
STATE ONLY: ^ /~]? DIRECTIONAL SURVEYS
Magnetic Single;~ot Di~e.~'tiona~urve~D~teL 12~R~6 Job//: AL12-86-D42
Gyroscopic Dire~ t fg~~d rvey ~/ //~a~. ~~ Job/t:
Date ( ~ Well Records LR2-1
Slando;d AIo~,~o ?~
Pr~uct~o~, Compony
90<) Eos. l Ben,,on 8oule,,
PO Bo~
Ancho~oge. Ato,,ko 99.519-6617
1907) 564.511 I
ARCO
EXXON
STANDARD
AL ASKA PRODUCTION
Date: 01/02/87
PHILLIPS
IO: ~: 77642
STATE OF AK
PDBY Systems (Transmittal Only)
SAPC MAGNETIC LIS TAPES & LISTINGS
The following material is being submitted herewith. Please acknowledge receipt by
signing a copy of this letter and returning it to this office:
~ * G-24
'----~ F-23
O.H. mag tape 12/16/86 #1 8390-10493 Sch #72134
O.H. 12/22/86 10213-12363 NL Tape Pos. #05021
Tape Pos. #05020
* EXXON' An Asterisk (*) next to a listing above means you should
have received the Tape(s) and Listing(s) directly from the respective
service co~]y. ~a~sc~confirm this.
Received . ~/~/:.,, /
, '~" '~'~:. ~:;~?~ Victoria Aldridge
~~TI~ ~D~L
A ~,~,l ol lh~ o,,(~*,,l~l ~,,,~l..,l (~1 (o,.t~t~,~~
MEMORANOUM Stat,- of Alaska
ALASKA OIL ..-~ND GAS CONSERVATION COMMIb~/ON
TO:
THRU:
FROM:
C. V~ C~t~z:ton
Chai:
Lonnie C. Smith
C ommis s loner
Edgar W. Sipple, Jr'.
Petroleum Inspector
DATE: December 10, 1986
FILE NO.: D.EWS..85
TELEPHONE NO.:
SUBJECT: BOP Test
SA C.,, ¢-24
Permit No. 86-183
Prudhoe Oil Pool
December 6. 1986: I traveled this date from ARCO Prudhoe Bay,
'sUbj~-¢-{ B-~er report, to Standard Alaska Production Company
G-24, Alaska United Rig 2, to witness a BOP test. The drilling
contractor was in the process of running casing.
December 7. 1986: The test commenced at 7:30 a.m. and was
~ c.~ ~de~--'~'~-'~J'~)-0 a.m.
There was one failure. The manual valve of the kill line was
leaking. On December 9 Donnie Fields called the AOGCC office, and
said the above valve was repaired and tested.
I filled out the AOGCC BOP inspection report which is attached.
In summary, I witnessed the BOP test on standard G-24, Alaska
United Rig 2.
Attachment
:f
02-001A(Rev 10-84) ' .
...... -' 5184
·
STATE OF ALASKA
ALASKA OIL & GAS CONSERVATION COMMISSION
B.O.P.E. Inspection Report
Operator ,~~ ~'
Location: Sec t~
Drillin Contractor
Location, General
General Housekeeping..
Reserve Pit
Mud Systems
Visual
Trip Tank O~
Pit Gauge Ok
Flow Monitor 0~'-
Gas Detectors
~"' Well Si
/~Casing' Set
Representative
. .~l-ar Pr_ceventer
ti, ~- ~ .....
Blind .Rams
Kill Line Valves
V
~ ~ c,,~ ~ .
Test Results: Failures
Audio
Test Pressure
ACCUMULATOR SYSTEM
~ o~o psig 3 050
200 psig ~) min~ sec.
Full C.hharg~Pres~ure~ttained: ~. min 3£sec.
.
Controls: Master
Remote ~ Blinds switch cover~
Kelly and Floor Safety Valves
Full Charge Pressure
Pressure After Closure
Pump incr. clos. pres.
Upper Kelly ~ Test Pressure
Lower Kelly D~~est Pressure
Ball Type ~/~'i~t Pressure
Inside BOP~. Test Pressure
Choke Manifold ~/~.' Test Pressure
No. flanges.~
Adjustable Chokes ~'~.2'~
Hvdrauically operated choke
~_~ooo
Repair or Replacement of failed equipment to be made within
Commission office notified.
,,-.F
Distribution
orig. - AO&GCC
cc - Operator
cc - Supervisor Inspect
days and Inspector/
November 25, 1986
Mr. R. S. Allan
Division Drilling Engineer
Standard Alaska Production Company
P.O. Box 196612
Anchorage, Alaska 99519-6612
Telecooy:
(907) 276-7542
Re: Prudhoe Bay Unit C~-24
Standard Alaska 'Production Company
Permit No 86-183
Sur. Loc. 2703'SNL, 1974'~L, Sec. 12, TllN, R13E, UM.
Btmhole Loc. 666'S~,, 4670'WEL, Sec. 18, TllN, R14E, UM.
Dear Mr. Allan:
Enclosed is the approved application for permit to drill the
above referenced well.
The permit to drill does not indemnify you from the probable need
to obtain additional permits required by law ~from other
governmental agencies prior to commencing operations at the well
site.
To aid us in scheduling field work, please notify this office 24
hoUrs prior to commencing installation of the blowout prevention
equipment so that a representative of the Commission may be
present to witness tesking of the equipment before the surface
casing shoe is drilled. ~nere a diverter system is required,
please also notify this office 24 hours prior to commencing
equipment installation so that the Commission may witness testing
before drilling below the shoe of the conductor pipe.
?~, trul~qyour s,
C. V. C~atterton
Chairman of
Alaska Oil and Gas Conservation Co~ission
BY ORDER OF THE ~O~ISSION
dif
EnclOsure
cc: Department of Fish~& Game, Habitat Section w/o encl.
Department of Environmental Conservation w/o enc!.
~.~r Doug ~
~ . ~. Lowery
STATE OF ALASKA
ALASKA ,L AND GAS CONSERVATION C'~..AMISSION
PERMIT TO DRILL
20 AAC 25.005
i
la. Type of work Drill ~: Redrill [31 lb. Type of well. Exploratory [] Stratigraphic Test [] Development Oil []
Re-Entry [] Deepen E-il Service [] Developement Gas [] Single Zone [] Multiple Zone []
2. Name of Operator 5. Datum Elevation (DF or KB) 10. Field and Pool
Standard Alaska Production Company KBE = 75 feet Prudhoe Bay Field
3. Address 6. Property Designation Prudhoe B~..y Oil
P. O. Box 196612, Anchorage, AK 99519-6612 ADL 28305 Pool
4. Location of well at surface 7. Unit or property Name 11. Type Bond(see 20 AAC 25.025)
2703' SNL, 1974' WEL, Sec. 12, TllN, R13E Prudhoe Bay Unit
At top of productive interval 8. Well nu ,mber Number
550' SNL, 4750' WEL, Sec. 18, TllN, R14E G-24 (11-18-11-14) K00683449-G-14
At total depth 9. Approximate spud date Amount
666' SNL, 4670' WEL, Sec. 18, TllN, R14E December 4, 1986 $200,000.00
12. Distance to nearest 13. Distance to nearest well 14. Number of acres in property 15. Proposed depth (MD and TVD)
property line 10335 'MD
ADL 28285 530 feet G-6 36 feet 2480 9137' TVD feet
16. To be completed for deviated wells 35.05u 17. Anticipated pressure (see 20 AAC 25.035 (e)(2)) 8800 TVDss
Kickoff depth 2800 feet Maximum hole angle 0 Maximum surface 3330 psig At total depth (TVD) 4390 psig
18. Casing program Setting Depth
size Specifications Top Bottom Quantity of cement
Hole Casing Weight Grade Coupling Length MD TVD MD TVD (include stage data)
20" Co]Lductor 80' S]]r¢~¢.~ 110' 110' 9 cu.yds, concrete
17-1/2": 13-.3/8" 72~ L-80 Butt. 2045' Surfac~ 2075' 2075'
17-1/2" 13-3/8" 72# ~-95 Butt. 605' 2072' 2075' 2680' 2680' 3723 cu. ft. Permafrost
12-1/4" 9-5/8" 47~ L-80 NSCC 4641' Surfac, ; 4671' 4500 '
12-1/4" 9-5/8" 47# L'80 Butt .... ~4756' 4671' 4500' 9427' 8394' 575 cu. ft. Class G
8-1/2" 7" 26~. L-80 ~TC4S 1157' 9178' 8190' ]~0335' 9137' 323 cu. ft. Class G
Present well condition summary
Total depth: measured feet Plugs (measured)
true vertical feet
Effective depth: measured feet Junk (measured)
true vertical feet
Casing Length Size Cemented Measured depth True Vertical depth
Structural
Conductor
Surface
Intermediate
Production "; '~ .... '-'
Liner ~. .
Perforation depth: measured
true vertical
20. Attachments Filing fee [] Property plat [] BOP Sketch ~ Diverter Sketch [] Drilling program []
Drilling fluid program [] Time vs depth plot [] Refraction analysis [] Seabed report [] 20 AAC 25.050 requirements []
21. I hereby certify that the foregoing is true and correct to the best of my knowledge
Signed ,, ~t_p, Title Division Drillinq Enoineer Date tt{t~J Io%
Commission Use Only
Permit Number ~(¢ '-/;J.~ 50-- ~~ 'L/(,?[ for other requirements
Conditions of approval Samples required [] Yes [~k-No Mud log required [] Yes ~' No
Hydrogen sulfide measures [] Yes [] No Directional survey required ~ Yes [] No
working p re f BO [] ; M; I~ 5M; [] 10M; [] 15M
Required ~gp,~, ~.~,~~!
Other: ~ by order of
Approved by Commissioner the commission Date
Form 10-401 Rev. 12-1-85
Submit in,/riplicate
PROPOSED DRILLING AND COMPL~ION PROGRAM
WELL G-24 [ 11-18-11-14 ] PBU
Install and cement 80' of 20" conductor to surface.
The drilling fluid program will consist of an 8.5-9.5 ppg spud mud
in the 17-1/2" hole, a 9.0-9.7 ppg water base mud in the 12-1/4"
hole and a 9.0 ppg water base mud in the 8-1/2" hole.
Drill 17 1/2" hole to 2700' and cement 13 3/8" L-80 Buttress casing
to surface.
Install blowout prevention equipment consisting of 5000 psi W.P.
pipe rams, blind rams, and annular preventer. Maximum possible
bottomhole .pressure is 4390 psi at 8800' TVDss based on original
resevoir pressure. Maximum possible surface pressure is 3330 psi
based on a gas column to surface from 8600' TVDss and an oil column
to 8800' TVDss.
Directionally drill 12 1/4" hole to the 9-5/8" casing point above
the Sadlerochit Sandstone. Run 9 5/8" 47# L-80 mixed string of
Buttress and NSCC to within 5' of 12 1/4" TD and cement in two
stages: First stage using Class G cement around the 9 5/8" shoe.
The second stage to be downsqueezed in the 13 3/8" x 9 5/8" annulus
followed by nonfreezing fluid.
Directionally drill 8 1/2'' hole to TD. Run 7" liner fr°mTD t° 250'
inside 9 5/8" casing shoe and cement using .Class G cement.
Clean out'to 7" float equipment. Change over to 9 6 ppg. Nac1
completion fluid. Test casing and lap to 3000 psi.
Run 9 5/8" production packer on internal plastic coated .tubing with
gas lift.mandrels'and~a sliding sleeve. .Sea. packer 50' above top of
liner.~'~-A-subSUrface~ safety.~valve'~ with'~:-dual contr°l?lines.~will .be
placed 50".bel°Wbase of permafrost, install and test'Xmas tree,
Displace 'tubing to-diesel. Set-and test packer.
Suspend well for perforating subsequent to rig release.
Tubing Size: 4 1/2", 12.6#, L-80, A/B Mod, BUT~, with 7 GLMs
Tailpipe Size: 4 1/2", 12.6#, L-80, BU~T
DAW:14-JUL-86
PROPOSED DOWNHOLE DIAGRAM
WELL G-24 [ 11-18-11-14 ]
PROPOSED DEPTH
BKB
PBU
20" Conductor 110
Ball Valve 2075
13 .3/8" Casing Shoe
17 1/2" Open Hole
2680
2700
4 1/2", 12.6#, L-80, A/B Mod, BUTT, with 7 GLMs
-.
'9 5/8." ~paCker'
7"' Tieback Assembly
: .
9 5/8" Casing Shoe
12 1/4' Hole
9429
9434
7" PBTD
7" Line r Shoe
8 1/2" Open Hole
DAW: 14-JUL-86
10294
10334
10334
§.O.P. STACK CONFIGURATION
13-5/8 IN. TRIPLE RAM STACK
S000 PSI WP
DRILLING
ANNULAR
PREVENTER
PIPE.. RAMS
I 1
2 IN. KILL LINE
DRILLING
SPOOL
GATE GATE
PIPE RAMS
1 I
BLIND RAMS
4 IN. CHOKE LINE
I
GATE GATE
1986
Alaska 0it & S~s Cons.
OS
IO 20
o$
iNE-cm.
LAT. : 70~t~;~t.4~_7_,;
Sc~te I": 400'
CERTIFICATE OF SURVEYOR
I hereby certify that lam properly registered to
practice land surveying in the State of Alaska end that' this plat
represents o location_ survey of the wettpod shoam'and fie well
thereon. This survey was mode by me or under my supervision
and ail dimensions and other details ore correct. Bottom hole
locations ore furnished by others.
Dote Surveyor
ADDED 6-24 BHL (Proposed)
ADDED G-26 BHL (Proposed.)
ADDED G-25 BI-IL (Proposed)
ALL BOTTOM HOLE: LOCATIONS ARE: ~1OO' ~4JB-SEA.
C~ ~o/i
~ gl~o/~
PROTRACTE O
PAD "G"
Located in
Surveyed for
B.P. AL~A INC.
by'
F. M: LINDSEY & ASSOC.
LAND & HYDROGRAPHIC SURVEYOREI
f Nortblrn Ligt~t$ ~oullMard Box
_$25DUA88: [DRANO13]G24_CLOSAP_.SH£!RT LIS¢ q
iO-NOV-l~86 ~ 4 4:~
.... Closest &pp'romch Analljsi.s .......
Date' lO-NOV-SA Time: t4. SI' 52
Search Radiu, s= PO0
For proposed well' ~-2a
COURSE LINE
[11-18--11-14]
Location = W-E S-N TVD(SBS)
Top 658255.00 5968947.00 -'75~00
Bottom 66055601 596575I~67 9061.86
Note~ All depths in ~eet B~low ~ellv Bu~shing (BKB)
Closest Approach Vertical Inter, section
WELL I]}ENT /PROPOSED\ /NEARBY\ CLOSEST /PROPOSED\ /NEARBY\
TVD DEPART TVD DEPART DISTANCE TVD DEPART TVD DEPART
A0~9-=~022 ! O0
g--3 ~c~O0. 0 2 2 ~896~ ~ 95. 6 359.
AO~-~O~500
~-4 4764. ! 8TO 2 48S6. I ~83. 5 ~39.
G-5 i 009 6 O.0 999~ 9 13.i 148.
A0~9-~035800
g--6 ~510. 3 O.0 2499~ 9 18.5 32.
A0~--203~900
~--7 8. 7 O.0 O. 0 O. 0 70
A029--205B 1 O0
AO~-~O~I 9OO
g--17 5924. 7 168a.3 5587. 5 2107. 2 11!6.
A0~9-2161300
G-30 ~100. 0 ~. 0 2106, 6 71. 4 380,
Page
VERTICAL
DISTANCE
SUMMARY
The ~eil ~hich comes cioses~ to
A0~'~-2035800 ~]-6
C!csest approach distance =
4283.9 533.3 4594. 5 83~.9 424.3
3756.0 209.2 3503.6 156.2 -~43.7
_~L:>$DUA88: [ DRANOt3]g24_CLOSAP_SHORT7, L IS; 3
lO-NOV-19~36 i4:43
--- Closest A.cpnoach Analgsis
Date- IO-NOV--SZ~ 'Time: 14: 42:47
Search Radios= 200 7 DEGREE LEAD LINE
For p~oposed ~ell: g-~4 [1t-18-11-14]
Location = W-E S-N TVD(SBS)
Top 658255.00 5968947.00 -.75.00
Bottom 680928.42 5966056.05 9061.86
Note: All depths in ~eet Below Kellg Bushing (BKB)
Closest Approach Vertical intersection
WELL iDENT /PROPOSED\ /NEARBY\ CLOSEST /PROPOSED\ /NEARBY\
TVD DEPART TVD DEPART DISTANCE TVD DEPART TVD DEPART
A029-2022100
G-3 2~00,0 2,2 2896. I 95.6 359. 5
A029-2022500
~-4 4413,9 624, 5 4543.9 716.9 251.2 4040.7
A029-2035100
~-5 I009 6 O0 999.9 13.4 148,8
A029-2035800
Q-6 2510.3 0.0 2499.9 18. 5 32. 5
~-7 4156.7 4~4.0 4124,6 431.5 ~i. i ~' 3959.6
~02~-2058100
~-8 2100.0 O. 0 2093.0 94,3 313. 2
A029-20~900
~-17 4775.0 B77.8 4738.9 1003. 5 1232.9
A029-2181300
~-30 2100.0 O. 0 2~06.8 71,4 380.3
F'.ag e
VERTICAL
DISTANCE
SUMMARY
The ~eil ~dhich comes closest to the proposed ~,el i i ~_
A02~7-2035800 ,3--6, ~'~
32. 5~ Feet
Closest ~pproach distance =
~<ICF, O~F ~o'r thi,~ rs, r, =
365. i 4469 ~ 658.4 442.&
315.4 3805,0 266.6 -!45.9
SUCTION
~UD pUt, P5
/'o ~UD
1 - Demco 6-12" Cone Shale Desander
1 - Demco 416H w/16 cones & (1) Demco
48H w/16 cones (Desilter)
1 - Drilco Atmospheric Mud Degasser
1- 200 gpm Operating Capacity. Centrifuge
15 - Brandt MA5 Mud Mix Agitators 1- 150 bbl. Trip Tank
1 - Pecording drilling fluid pit level
indicator with both visual and audio
warning devices at driller' s console
$0 B~
~0 &6L
TO
1 - Drilling fluid flow s.~,~s; or
· 'ls
with readout at
console
CHECK LIST FOR NEW W~I.L PI!RMITS
ITEM APPROVE DATE
(1) Fee ~,~_ 1)~ ~,~"~ 1.
2.
( ~) 3.
4.
5.
6.
7.
8.
(3) Admin
(8)
9.
(~ thr~ 13) . 10.
.... (10 and lB)/ 12.
13.
(4) Casg ~ t~~)
'(23 thr~ 28)
Company
Is the permit fee attached ............................
Is well located proper distance from property line . .
Is Well located proper distance from other rolls .... 2 .
Is sufficient undedicated acreage available in this pool .
Is well to be deviated and is wellbore plat included .....
Is operator the only affected party ......................
Can permit be approved before fifteen-day wait ...........
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
26.
27.
28.
(6) OTI'IER
(29 thru 31)
(6) Add: :~~.. 7]~,/~f.
Geology: Engi~..e.e,/ing:
~A ~ ii ~
rev: 07/18/86
~
For
29.
30.
31.
32.
eee®®eeeeee ~
eeeeeeeeeee
e®eeeeeeeee ~
eeeeee~eeee
Does operator have a bond in force ..................................
Is a conservation order needed ......................................
Is administrative approval needed .................. . .................
Is the lease number appropriate .....................................
Does thewell have a unique name and number ......................... ~.~
Is conductor string provided ........................................
Will surface casing protect fresh water zones .......................
Is enough cement used to circulate on conductor and surface ......... ~
Will cement tie in surface and intermediate or production strings ... _
Will cement cover all known productive horizons ..................... ~
Will all casing give adequate safety in collapse, tension and burst.. .
Is this well to be kicked off from an existing wellbore .............
Is old wellbore abandonment procedure included on 10-403 ............
Is adequate wellbore separation proposed ...... , ..................... ~'"
Is a diverter system required .......................................
Is the drilling fluid program schematic and list of equipment adequate /~
Are necessary diagrams and descriptions of diverter and BOPE attached. ~
Does BOPE have sufficient pressm-e rating - Test to O~5~ psig .. ~
Does the choke manifold comply w/AP1 RP-53 (May 84) ..................
Is the presence of H2S gas probable ................................. ....
exploratory and Stratigraphic wells:
Are data presented on potential overpressure zones? .................
Are seismic analysis data presented on shallow gas zones ............
If an offshore loc., are survey results of seabed conditions presented
Additional requirements .............................................
POOL
INITIAL
CLASS STATUS
GEO.
AREA
UNIT
NO.
ON/OR
SHORE
Lease & Well
YES NO
, ,
Additional Remarks
Well History File
AP'PENDIX
Information of detailed nature that is not
particularly germane to the Well Permitting Process
but is part of the history file,
To improve the readability of the Well History file and to
simplify finding information, information, of this
nature is accumulated at the end of the file under APPENDIX.
No special 'effort has been made to chronologiCally
organize this Category of information.
G 24
!
~/~ PRUDHOE BAY
03 - January - 1995
RECEIVED
JAI~ ~ 7 1995
WF.~TERN
All. AS
Anchorag, Atlas Wireline Services
Tape Subfile 2 is type: LIS
TAPE HEADER
PRUDHOE BAY UNIT
CASED HOLE WIRELINE LOGS
WELL NAME:
API NUMBER:
OPERATOR:
LOGGING COMPANY:
TAPE CREATION DATE:
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
SURFACE LOCATION
SECTION:
TOWNSHIP:
RANGE:
FNL:
FSL:
FEL:
FWL:
ELEVATION (FT FROM MSL 0)
KELLY BUSHING:
DERRICK FLOOR:
GROUND LEVEL:
WELL CASING RECORD
500292167100
BP EXPLORATION (ALASKA) INC.
ATLAS WIRELINE SERVICES
18-JAN-95
4600.03
J. DAHL
P. COLLINS
12
llN
13E
2703
3305
72.00
71.00
34.60
OPEN HOLE CASING DRILLERS CASING
BIT SIZE (IN) SIZE (IN) DEPTH (FT) WEIGHT (LB/FT)
1ST STRING
2ND STRING 9.625 9495.0
3RD STRING 7.000 10475.0
PRODUCTION STRING 4.500 10282.0
CURVE SHIFT DATA - ALL PASSES TO STANDARD (MEASURED DEPTH)
BASELINE CURVE FOR SHIFTS
BHCS
GR
2
1
05-DEC-86
SWS
PBU TOOL CODE:
PBU CURVE CODE:
RUN NUMBER:
PASS NUMBER:
DATE LOGGED:
LOGGING COMPANY:
......... EQUIVALENT UNSHIFTED DEPTH
GRCH
9496.5
9503.5
9508.5
9512.5
9519.0
9519.5
9520.0
9547.5
9549.5
9550.5
9560.5
9566.0
9574.5
BASELINE DEPTH
9496.0
9503.5
9508.5
9512.0
9518.5
9519.5
9520.0
9546.5
9548.5
9549.0
9559.0
9565.0
9573.5
47.00
29.00
12.60
9576.0
9580.5
9583.5
9585.5
9587.0
9588.0
9592.5
9594.5
9595.5
9606.0
9607.0
9618.5
'9620.0
9632.5
9633.5
9636.5
9637.0
9653.0
9654.0
9655.0
9664.5
9681.0
9682.0
9692.0
9692.5
9698.0
9699.0
9702.0
9771.0
9776.5
9777.5
9795.5
9801.5
9802.0
9819.0
9836.5
9837.5
9842.5
9966.0
10099.0
10100.0
10101.0
10111.0
10130.5
10140.0
10202.5
10214.5
10230.0
10263.5
10270.0
10276.5
10284.0
10285.0
10288.5
10307.0
10316.0
$
REMARKS:
9577.5
9581.0
9584.0
9586.0
9588.0
9589.5
9594.0
9596.0
9596.5
9607.0
9607.5
9619.0
9620.0
9632.5
9633.0
9636.0
9637.0
9653.0
9653.5
9654.0
9664.5
9681.0
9681.5
9691.5
9692.5
9698.0
9698.5
9701.5
9771.5
9777.0
9777.5
9795.5
9801.0
9801.5
9819.0
9836.5
9837.0
9842.5
9966.0
10099.5
10100.5
10101.0
10111.0
10131.0
10140.5
10203.0
10216.0
10231.5
10264.0
10271.0
10277.0
10285.5
10286.5
10289.5
10308.0
10318.0
CN/GR Cased Hole.
LOG TIED INTO: CBT
(23-JAN-87/SWS)
REF:
BHCS
(16-DEC-86/SWS)
WELL TEST SUMMARY
TEST DATE
ELAPSED TIME
GROSS FLUID RATE
NET OIL RATE
NET WATER RATE
FORMATION GAS RATE
LIFT GAS RATE
CASING PRESSURE
TGOR
TGLR
CHOKE OPENING
MANIFOLD PRESSURE
11/15/94
HOURS 4.0
MPBD 1.00
MBOPD 1.00
MBWPD 0.00
MMSCFD 13.80
SCF/STB 13751
MMSCFD 0.00
PSIG 0
SCF/STB 13751
SCF/BBL 13746
46.9
PSIG 2044
110
0.0
MANIFOLD TEMPERATURE DEGF
WATER CUT (CALC) PCNT
PUMPED 115 BBLS OF SEAWATER BEFORE GOING INTO HOLE.
PUMPED 22 BBLS OF SEAWATER AFTER FIRST TUBING TAIL
.PASS.
PUMPED 23 BBLS OF SEAWATER AFTER THIRD TUBING TAIL
PASS.
LOGGED ONLY 2 FULL PASSES AT CUSTOMER'S REQUEST.
THESE 2 FULL PASSES WERE THE ONLY PASSES USED FOR
AVERAGE PASS. TUBING TAIL PASSES WERE NOT INCLUDED.
LOGGING SPEED WAS 15 FEET PER MINUTE.
TOOL STICKING AT TUBING TAIL. DOWN PASS LOGGED (PASS
NO.5) TO CONFIRM DATA ACROSS TUBING TAIL.
NEUTRON LOG PARAMETERS: SANDSTONE MATRIX, CHISM OFF
CALIPER CORRECTION = 0.000
CASING CORRECTIONS ACTIVE,
SALINITY = 0.0 PPM
SHIFT PROCEDURE AS FOLLOWS:
1) FIRST PASS GAMMA RAY DEPTH MATCHED TO OPEN HOLE
GAMMA RAY o
2) FIRST PASS NEUTRON DEPTH MATCHED TO "SHIFTED"
FIRST PASS GAMMA RAY.
3) ALL SUBSEQUENT GAMMA RAY PASSES DEPTH MATCHED TO
"SHIFTED" FIRST PASS GAMMA RAY.
4) ALL SUBSEQUENT NEUTRON PASSES DEPTH MATCHED TO
"SHIFTED" FIRST PASS NEUTRON.
/ ??MATCH1A. OUT
$
FILE HEADER
FILE NUMBER: 1
EDITED CURVES
Depth shifted and clipped curves
PASS NUMBER: 1
DEPTH INCREMENT: 0.5000
FILE SUMMARY
PBU TOOL CODE START DEPTH
GRCH 9434.0
2418 9442.0
$
CURVE SHIFT DATA - PASS TO PASS
BASELINE CURVE FOR SHIFTS
PBU CURVE CODE: GRCH
PASS NUMBER: 1
......... EQUIVALENT UNSHIFTED DEPTH .........
for each run in separate files.
STOP DEPTH
10322.0
10330.0
BASELINE DEPTH NPHI
9451.0 9451.5
9470.0 9470.5
9496.5 9496.5
9500.0 9499.0
9503.5 9503.5
9508.5 9508.5
9512.0 9512.5
9518.5 9519.0
9519.5 9519.5
9520.0 9520.0
9546.5 9547.5
9553.5 9553.5
9566.5 9567.0
9573.5 9574.5
9576.0 9577.5
9580.5 9581.0
9583.5 9584.0
9585.5 9586.0
9587.0 9588.0
9588.0 9589.5
9592.5 9594.0
9594.5 9596.0
9595.5 9596.5
9606.0 9607.0
9607.0 9607.5
9611.0 9611.5
9618.5 9619.0
9620.0 9620.0
9632.5 9632.5
9633.5 9633.0
9636.5 9636.0
9637.0 9637.0
9644.0 9643.5
9653.0 9653.0
9654.0 9653.5
9655.0 9654.0
9664.5 9664.5
9681.0 9681.0
9682.0 9681.5
'9687'.5
9692.0
9698.0
9699.0
9702.0
9709.5
9764.0
9771.0
9776.5
9777.5
9795.5
9801.5
9802.0
9819.0
9824.5
9830.5
9836.5
9837.5
9842.5
9960.0
9966.0
10099.0
10100.0
10101.0
10111.0
10122.5
10130.5
10136.0
10140.0
10171.0
10202.5
10215.5
10226.0
10230.0
10263.5
10270.0
10276.5
10286.0
10290.5
10294.5
10312.5
10318.5
$
REMARKS:
9688.0
9691.0
9698.0
9698.5
9701.5
9708.5
9764.0
9771.5
9777.0
9777.5
9795.5
9801.0
9801.5
9819.0
9824.0
9830.0
9836.5
9837.0
9842.5
9959.5
9966.0
10099.5
10100.5
10101.0
10111.0
10121.0
10131.0
10137.0
10140.5
10170.5
10202.0
10215.5
10227.0
10231.5
10264.0
10271.0
10277.0
10288.0
10291.5
10294.5
10313.0
10319.0
PASS 1 (MAIN PASS, AFTER PUMPING 160 BBLS).
FUCT, NUCT, & TENS WERE SHIFTED WITH NPHI.
GRCH WAS DEPTH MATCHED TO OPEN HOLE GAMMA RAY.
CN
WN
FN
COUN
STAT
/ ? ?MATCH1B. OUT
$
: BP EXPLORATION (ALASKA)
: G- 24 (11-18-11-14)
: PRUDHOE BAY
: NORTH SLOPE
: ALASKA
* FORMAT RECORD (TYPE# 64 )
ONE' DEPTH PER FRAME
Tape depth ID: F
5 Curves:
Name Tool Code Samples Units
1 GRCH 2418 68 1 GAPI
2 NPHI 2418 68 1 PU-S
3 FUCT 2418 68 1 CPS
4 NUCT 2418 68 1 CPS
5 TENS 2418 68 i LB
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
4 4 86 720 65 6
4 4 86 720 65 6
4 4 86 720 65 6
4 4 86 720 65 6
4 4 86 720 65 6
20
* DATA RECORD (TYPE# O) 1014 BYTES *
Total Data Records: 45
Tape File Start Depth = 10350.000000
Tape File End Depth = 9425.000000
Tape File Level Spacing = 0.500000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68
11107 datums
Tape Subfile: 2
331 records...
Minimum record length:
Maximum record length:
62 bytes
1014 bytes
Tape Subfile 3 is type: LIS
FILE HEADER
FILE NUMBER: 2
EDITED CURVES
Depth shifted and clipped curves
PASS NUMBER: 2
DEPTH INCREMENT: 0.5000
FILE SUMMARY
PBU TOOL CODE START DEPTH
GRCH 9447.0
2418 9447.0
$
CURVE SHIFT DATA - PASS TO PASS
BASELINE CURVE FOR SHIFTS
PBU CURVE CODE: GRCH
PASS NUMBER: 1
BASELINE DEPTH
9458.5
9485.5 9484.5
9488.5 9487.5
9489.5 9488.0
9491.0 9489.5
9491.5 9490.5
9494.0 9493.0
9495.5
9500.0
9502.0 9500.5
9506.5 9505.0
9507.5 9507.0
9516.0
9520.0 9519.5
9521.0 9520.0
9522.5 9521.5
9546.0 9546.5
9557.5 9558.0
9558.5 9558.5
9566.0 9566.0
9570.0
9580.5 9580.o
9583.0 9583.5
9584.0
9588.0 9588.0
9594.5 9595.0
9600.5
9603.5 9603.5
9604.5 9604.0
9610.5 9610.0
9611.0
9622.5 9621.5
9623.0
9625.5 9624.5
9626.5 9625.0
9641.5
9645.5
for each run in separate files.
STOP DEPTH
10322.0
10330.0
(MEASURED DEPTH)
......... EQUIVALENT UNSHIFTED DEPTH .........
GRCH NPHI
9458.0
9495.5
9499.0
9505.0
9515.5
9556.5
9570.0
9583.5
9600.5
9610.5
9622.0
9640.0
9644.0
'9654'.0
9661.5
9665.5
'9667.5
9668.0
9668.5
9669.5
9681.0
9682.0
9682.5
9683.0
9693.0
9695.5
9700.5
9701.5
9702.5
9709.0
9738.5
9757.0
9768.0
9779.0
9780.0
9780.5
9783.5
9787.0
9791.0
9793.0
9824.5
9825.0
9826.0
9826.5
9827.0
9831.0
9836.5
9837.0
9839.0
9842.5
9849.5
9869.5
9873.5
9878.0
9880.0
9896.0
9901.5
9913.5
9920.0
9922.5
9927.5
9931.0
9934.0
9948.5
9966.0
9969.5
9971.5
9977.0
9982.5
9985.5
9993.0
10029.5
10033.0
9652.5
9664.5
9667.5
9668.0
9680.5
9681.0
9691.0
9694.0
9700.0
9700.5
9778.0
9778.5
9779.0
9782.5
9791.5
9823.5
9826.5
9830.0
9836.0
9848.0
9660.5
9666.5
9667.5
9680.5
9681.0
9699.0
9707.0
9736.5
9755.5
9766.5
9779.5
9786.0
9789.5
9823.5
9824.0
9825.0
9835.0
9837.0
9840.5
9868.5
9872.5
9877.0
9878.5
9894.5
9899.5
9911.5
9918.5
9920.5
9925.5
9928.5
9931.5
9946.5
9964.0
9968.5
9970.0
9975.5
9981.5
9984.5
9991.5
10028.0
10032.0
'10036.
10038.
10066.
10073.
10082.
10088.
10091.
10096.
10096.
10097.
10105.
10109.
10112.
10119.
10120.
10126.
10126.
10130.
10130.
110131.
10131.
10138.
10142.
10142.
10147.
10161.
10163.
10163.
:10171.
10195.
10195.
10202.
10204.
10211.
10215.
10220.
10221.
10224.
10228.
10230.
10230.
10231.
10234.
10238.
10238.
10239.
10239.
10241.
10248.
10262.
10265.
10267.
10268.
10269.
10269.
10274.
10279.
:L0280.
10281.
10285.
10091.0
10104.0
10110.5
10125.5
10126.0
10130.0
10136.5
10141.0
10146.0
10201.5
10214.5
10222.0
10224.5
10228.0
10238.0
10238.5
10239.0
10264.5
10267.5
10268.0
10280.0
10281.0
10285.0
10035.0
10036.0
10065.0
10072.0
10081.0
10086.0
10094.5
10095.0
10096.0
10108.5
10117.0
10117.5
10123.5
10129.0
10129.5
10130.5
10141.0
10159.0
10160.5
10161.5
10169.5
10192.5
10193.5
10201.5
10209.0
10219.5
10229.0
10230.0
10231.0
10234.5
10238.0
10239.0
10242.0
10247.5
10262.0
10264.5
10266.0
10267.0
10273.0
10280.0
i0286'. 0
10287.5
10290.0
10291.0
10296.0
10309.5
10312.5
1.0313.5
10316.0
10317.5
10324.5
$
REMARKS:
10285.5
10287.0
10289.5
10309.0
10313.5
10317.5
10287.0
10289.5
10290.0
10295.0
10309.0
10313.0
10317.0
10325.0
PASS 2 (REPEAT PASS, AFTER PUMPING 160 BBLS).
FUCT, NUCT, & TENS WERE SHIFTED WITH NPHI.
CN
WN
FN
COUN
STAT
/ ??MATCH2A. OUT
/ ??MATCH2B. OUT
$
: BP EXPLORATION (ALASKA)
: G - 24 (11-18-11-14)
: PRUDHOE BAY
: NORTH SLOPE
: ALASKA
* FORMAT RECORD (TYPE# 64)
ONE DEPTH PER FRAME
Tape depth ID: F
5 Curves:
Name Tool Code Samples Units
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
1 GRCH 2418 68 1 GAPI
2 NPHI 2418 68 1 PU-S
3 FUCT 2418 68 1 CPS
4 NUCT 2418 68 1 CPS
5 TENS 2418 68 1 LB
4 4 86 720 65 6
4 4 86 720 65 6
4 4 86 720 65 6
4 4 86 720 65 6
4 4 86 720 65 6
_______
20
* DATA RECORD (TYPE# 0) 1014 BYTES *
Total Data Records: 45
Tape File Start Depth = 10350.000000
Tape File End Depth = 9425.000000
Tape File Level Spacing = 0.500000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68
Tape Subfile: 3
Minimum record length:
Maximum record length:
11107 datums
247 records...
62 bytes
1014 bytes
Tape Subfile 4 is type: LIS
FILE HEADER
FILE NUMBER: 3
EDITED CURVES
Depth shifted and clipped curves for each run in separate files.
PASS NUMBER: 3
DEPTH INCREMENT: 0.5000
FILE SUMMARY
PBU TOOL CODE
GRCH
2418
$
CURVE SHIFT DATA - PASS TO PASS
BASELINE CURVE FOR SHIFTS
PBU CURVE CODE: GRCH
PASS NUMBER: 1
START DEPTH
10144.0
10144.0
BASELINE DEPTH GRCH
10153.5 10154.0
10158.5 10159.0
10161.5
10168.0
10169.0
10182.5
10189.5
10195.5
10201.0
10203.0 10203.5
10206.0
10210.5
10212.0 10213.0
10219.5 10221.0
10220.0
10220.5 10222.0
10222.5 10223.5
10229.5
10230.0
10235.0
10238.5 10239.5
10239.5 10240.0
10262.0 10262.5
10262.5 10263.5
10263.0
10263.5
10267.0
10268.5 10269.5
10269.5 10270.0
10271.0 10271.5
10274.5
10278.5 10280.0
10280.0
10285.0 10286.5
10287.5 10288.5
10290.5 10291.5
10291.0
STOP DEPTH
10322.0
10330.0
(MEASURED DEPTH)
EQUIVALENT UNSHIFTED DEPTH
NPHI
10161.5
10168.0
10168.5
10182.0
10188.5
10194.5
10200.5
10205.5
10210.0
10220.5
10230.0
10231.0
10236.5
10264.5
10266.0
10267.5
10275.0
10282.0
10291.0
~0291'. 5
10292.5
10296.0
10307.0
10309.5
10310.0
10313.0
10314.0
10315.5
10318.0
10318.5
10324.5
$
REMARKS:
10308.5
10311.5
10318.0
10291.5
10292.0
10295.5
10311.5
10315.0
10315.5
10319.5
10321.5
9691.0 10325.0
PASS 3 (FIRST TUBING TAIL PASS, AFTER PUMPING
115 BBLS).
FUCT, NUCT, & TENS WERE SHIFTED WITH NPHI.
CN
WN
FN
COUN
STAT
/ ? ?MATCH3A. OUT
/ ? ?MATCH3 B. OUT
$
: BP EXPLORATION (ALASKA)
: G - 24 (11-18-11-14)
: PRUDHOE BAY
: NORTH SLOPE
: ALASKA
* FORMAT RECORD (TYPE# 64)
ONE DEPTH PER FRAME
Tape depth ID: F
5 Curves:
Name Tool Code Samples Units
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
I GRCH 2418 68 1 GAPI
2 NPHI 2418 68 1 PU-S
3 FUCT 2418 68 1 CPS
4 NUCT 2418 68 1 CPS
5 TENS 2418 68 1 LB
4 4 86 720 65 6
4 4 86 720 65 6
4 4 86 720 65 6
4 4 86 720 65 6
4 4 86 720 65 6
2O
* DATA RECORD (TYPE# 0) 1014 BYTES *
Total Data Records: 45
Tape File Start Depth = 10350.000000
Tape File End Depth = 9425.000000
Tape File Level Spacing = 0.500000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68 22214 datums
Tape Subfile: 4 129 records...
Minimum record length: 62 bytes
Maximum record length: 1014 bytes
Tape Subfile 5 is type: LIS
FILE HEADER
FILE NUMBER: 4
EDITED CURVES
Depth shifted and clipped curves
PASS NUMBER: 4
DEPTH INCREMENT: 0.5000
FILE SUMMARY
PBU TOOL CODE START DEPTH
GRCH 10150.0
2418 10150.0
$
CURVE SHIFT DATA - PASS TO PASS
BASELINE CURVE FOR SHIFTS
PBU CURVE CODE: GRCH
PASS NUMBER: i
for each run in separate files.
STOP DEPTH
10322.0
10330.0
(MEASURED DEPTH)
BASELINE DEPTH GRCH
10155.0 10155.0
10159.5 10159.5
10168.5 10169.5
10182.0 10181.5
10182.5 10182.0
10191.5 10190.0
10192.0 10190.5
10193.0 10191.0
10195.0 10193.0
10197.5 10197.5
10201.5 10200.5
10203.5 10202.5
10215.5 10215.5
10220.5 10221.0
10223.0 10224.0
10225.0 10226.0
10228.5 10229.0
10237.5 10238.0
10241.0 10241.5
10253.5 10255.0
10263.0 10264.0
10263.5 10265.0
10264.0 10265.0
10264.5 10266.0
10265.0 10265.5
10266.0 10266.5
10267.0 10267.0
10267.5 10268.0
10270.5 10271.0
10274.0 10274.5
10274.5 10275.5
10275.0 10276.0
10275.5 10277.0
10276.0 10278.0
10278.5 10280.0 10280.5
10279.5 10281.0
10285.5 10287.0
EQUIVALENT UNSHIFTED DEPTH
NPHI
~10287.5
10288.5
10290.5
10291.0
10292.0
10294.0
10305.5
10309.0
10310.0
10310.5
10311.0
10311.5
10315.0
10316.5
10317.0
10317.5
10318.5
10324.5
$
REMARKS:
10294.5
10297.0
10306.5
10312.5
10313.0
10317.0
9700.0
9700.5
10289.0
10289.5
10292.0
10292.5
10309.5
10310.0
10311.0
10312.0
10317.5
10318.5
10319.0
10319.5
10325.0
PASS 4 (SECOND TUBING TAIL PASS, AFTER PUMPING
137 BBLS).
FUCT, NUCT, & TENS WERE SHIFTED WITH NPHI.
CN
WN
FN
COUN
STAT
??MATCH4A · OUT
?MATCH4 B. OUT
: BP EXPLORATION (ALASKA)
: G - 24 (11-18-11-14)
: PRUDHOE BAY
: NORTH SLOPE
: ALASKA
* FORMAT RECORD (TYPE# 64)
ONE DEPTH PER FRAME
Tape depth ID: F
5 Curves:
Name Tool Code Samples Units
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
1 GRCH 2418 68 1 GAP I 4
2 NPHI 2418 68 1 PU-S 4
3 FUCT 2418 68 1 CPS 4
4 NUCT 2418 68 1 CPS 4
5 TENS 2418 68 1 LB 4
4 86 720 65 6
4 86 720 65 6
4 86 720 65 6
4 86 720 65 6
4 86 720 65 6
20
* DATA RECORD (TYPE# 0) 1014 BYTES *
Total Data Records: 45
Tape File Start Depth = 10350.000000
Tape File End Depth = 9425.000000
Tape File Level Spacing = 0.500000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68 22214 datums
Tape Subfile: 5 135 records...
Minimum record length: 62 bytes
Maximum record length: 1014 bytes
Tape Subfile 6 is type: LIS
FILE HEADER
FILE NUMBER: 5
EDITED CURVES
Depth shifted and clipped curves for each run in separate files.
PASS NUMBER: 5
DEPTH INCREMENT: .5000
FILE SUMMARY
PBU TOOL CODE
GRCH
2418
$
CURVE SHIFT DATA - PASS TO PASS
BASELINE CURVE FOR SHIFTS
PBU CURVE CODE GRCH
PASS NUMBER: 1
START DEPTH
10124.0
10124.0
BASELINE DEPTH GRCH
10130.0
10135.5 10134.5
10140.5
10142.5
10144.5 10144.0
10147.5 10147.0
10154.0 10153.5
10175.5
10179.5
10195.0
10202.5 10201.5
10215.0 10214.5
10217.0 10217.0
10219.0
10220.0 10220.5
10229.0 10229.0
10229.5
10230.0
10231.0
10231.5
10234.0 10234.5
10239.0 10238.5
10240.0
10241.5
10243.0 10242.0
10252.5 10253.0
10263.0
10263.5
10264.0
10265.5
10266.5 10266.5
10267.5
10276.0 10276.5
10276.5
10283.0
10286.0
10288.5 10288.5
STOP DEPTH
10322.0
10330.0
(MEASURED DEPTH)
EQUIVALENT UNSHIFTED DEPTH
NPHI
10129.0
10139.5
10141.0
10174.0
10177.5
10193.0
10201.5
10218.5
10229.0
10230.0
10231.0
10232.0
10240.0
10240.5
10241.0
10264.0
10265.0
10265.5
10266.0
10266.5
10267.0
10275.5
10277.0
10283.5
10286.5
10290.5
10293.0
10294.0
10296.0
10300.0
10309.0
10310.0
].0312.5
10313.5
10314.0
10315.5
10319.0
10324.5
$
REMARKS:
10290.0
10291.0
10291.5
10293.5
10300.5
10307.5
10309.5
10311.0
10311.5
10312.5
10316.0
10317.5
10325.0
PASS 5 (THIRD TUBING TAIL PASS, LOGGED DOWN,
AFTER PUMPING 137 BBLS).
FUCT, NUCT, & TENS WERE SHIFTED WITH NPHI.
CN
WN
FN
COUN
STAT
/ ? ?MATCH5A. OUT
/ ? ?MATCH5B. OUT
$
: BP EXPLORATION (ALASKA)
: G- 24 (11-18-11-14)
: PRUDHOE BAY
: NORTH SLOPE
: ALASKA
* FORMAT RECORD (TYPE# 64)
ONE DEPTH PER FRAME
Tape depth ID: F
5 Curves:
Name Tool Code Samples Units
1 GRCH 2418 68 1 GAPI
2 NPHI 2418 68 1 PU-S
3 FUCT 2418 68 1 CPS
4 NUCT 2418 68 1 CPS
5 TENS 2418 68 1 LB
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
4 4 86 720 65 6
4 4 86 720 65 6
4 4 86 720 65 6
4 4 86 720 65 6
4 4 86 720 65 6
2O
* DATA RECORD (TYPE# 0) 1014 BYTES *
Total Data Records: 45
Tape File Start Depth = 10350.000000
Tape File End Depth = 9425.000000
Tape File Level Spacing = 0.500000
Tape File Depth Units = Feet
*~** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68 33321 datums
Tape Subfile: 6 130 records...
Minimum record length: 62 bytes
Maximum record length: 1014 bytes
Tape Subfile 7 is type: LIS
FILE HEADER
FILE NUMBER: 6
AVERAGED CURVES
Compensated Neutron: Arithmetic average of edited passes for all curves.
Pulsed Neutron: Unaveraged edited Pass I gamma ray and background counts;
arithmetic average of edited static baseline passes for all other curves.
DEPTH INCREMENT: .5000
PASSES INCLUDED IN AVERAGE
PBU TOOL CODE PASS NUMBERS
GRCH
2418
$
REMARKS:
CN
WN
FN
COUN
STAT
1, 2
1, 2
AVERAGED PASS.
GRCH, NPHI, FUCT, & NUCT WERE AVERAGED.
ONLY THE FIRST 2 PASSES WERE AVERAGED SINCE THEY ARE THE
ONLY PASSES WHICH COVER THE ENTIRE INTERVAL.
$
: BP EXPLORATION (ALASKA)
: G- 24 (11-18-11-14)
: PRUDHOE BAY
: NORTH SLOPE
: ALASKA
* FORMAT RECORD (TYPES 64 )
ONE DEPTH PER FRAME
Tape depth ID: F
4 Curves:
Name Tool Code Samples Units
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
1 GRCH CNAV 68 1 GAPI
2 NPHI CNAV 68 1 PU-S
3 FUCT CNAV 68 1 CPS
4 NUCT CNAV 68 1 CPS
4 4 35 725 65 1
4 4 35 725 65 1
4 4 35 725 65 1
4 4 35 725 65 1
16
* DATA RECORD (TYPES 0) 1006 BYTES *
Total Data Records: 38
Tape File Start Depth = 10350.000000
Tape File End Depth = 9425.000000
Tape File Level Spacing = 0.500000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS' representation code decoding summary:
Rep Code: 68 31470 datums
Tape Subfile: 7 62 records...
Minimum record length: 26 bytes
Maximum record length: 1006 bytes
Tape Subfile 8 is type: LIS
FILE HEADER
FILE NUMBER: 7
RAW CURVES
Curves and log header data for each pass in seperate files; raw background
pass in last file.
PASS NUMBER: I
DEPTH INCREMENT: 0.2500
FILE SUMMARY
VENDOR TOOL CODE START DEPTH
GR 9432.5
2418 9441.0
$
LOG HEADER DATA
STOP DEPTH
10329.5
10337.5
DATE LOGGED:
SOFTWARE VERSION:
TIME LOGGER ON BOTTOM:
TD DRILLER (FT):
TD LOGGER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT) :
LOGGING SPEED (FPHR):
DEPTH CONTROL USED (YES/NO):
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
PCM PULSE CODE MODULATOR
GR GAMMA RAY
CN COMPENSATED NEUTRON
CCL CASING COLLAR LOC.
$
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
LOGGER'S CASING DEPTH (FT):
BOREHOLE CONDITIONS
FLUID TYPE:
FLUID DENSITY (LB/G):
SURFACE TEMPERATURE (DEGF):
BOTTOM HOLE TEMPERATURE (DEGF):
FLUID SALINITY (PPM):
FLUID LEVEL (FT):
FLUID RATE AT WELLHEAD (BPM):
WATER CUTS (PCT):
GAS/OIL RATIO:
CHOKE (DEG):
NEUTRON TOOL
TOOL TYPE (EPITHERMAL OR THERMAL):
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
03-JAN-95
FSYS JlV2 BETA RELEASE 4
1345 03-JAN-95
10331.0
10335.0
9450.0
10334.0
900.0
YES
TOOL NUMBER
3507XA
1310XA
2418XA
2323XA
0.000
10475.0
0.0
SEAWATER/CRUDE
0.00
0.0
0.0
0
0.0
0.000
0.000
0.000
0.0
THERMAL
SANDSTONE
0.00
0.000
BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE
TOP NORMALIZING WINDOW (FT) :
BASE NORMALIZING WINDOW (FT):
0.0
0.0
BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER
FAR COUNT RATE LOW SCALE (CPS) : 4
FAR COUNT RATE HIGH SCALE (CPS): 400
NEAR COUNT RATE LOW SCALE (CPS): 50
NEAR COUNT RATE HIGH SCALE (CPS): 1050
TOOL STANDOFF (IN):
0.0
REMARKS:
PASS 1 (MAIN PASS, AFTER PUMPING 160 BBLS).
$
CN
WN
FN
COUN
STAT
: BP EXPLORATION (ALASKA)
: G - 24 (11-18-11-14)
: PRUDHOE BAY
: NORTH SLOPE
: ALASKA
* FORMAT RECORD (TYPE# 64)
ONE DEPTH PER FRAME
Tape depth ID: F
9 Curves:
Name Tool Code Samples Units
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
1 GR 2418 68 1 GAPI 4
2 CNC 2418 68 1 PU-S 4
3 CN 2418 68 1 PU-L 4
4 LSN 2418 68 1 CPS 4
5 SSN 2418 68 1 CPS 4
6 CCL 2418 68 1 4
7 SPD 2418 68 1 F/MN 4
8 TTEN 2418 68 1 LB 4
9 TEN 2418 68 1 LB 4
4 19 991 67 5
4 86 720 65 6
4 31 149 96 6
4 27 466 87 5
4 28 122 23 5
4 79 150 21 1
4 65 866 87 0
4 31 402 87 0
4 31 402 87 0
36
* DATA RECORD (TYPE# 0) 1006 BYTES *
Total Data Records: 148
Tape File Start Depth = 10346.000000
Tape File End Depth = 9425.000000
Tape File Level Spacing = 0.250000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68 70172 datums
Tap~ Subfile: 8
Minimum record length:
Maximum record length:
223 records...
62 bytes
1006 bytes
Tape Subfile 9 is type: LIS
FILE HEADER
FILE NUMBER: 8
RAW CURVES
Curves and log header data for each pass in seperate files; raw background
pass in last file.
PASS NUMBER: 2
DEPTH INCREMENT: 0.2500
FILE SUMMARY
VENDOR TOOL CODE START DEPTH
GR 9441.0
2418 9441.0
$
LOG HEADER DATA
STOP DEPTH
10328.5
10336.5
DATE LOGGED:
SOFTWARE VERSION:
TIME LOGGER ON BOTTOM:
TD DRILLER (FT):
TD LOGGER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
LOGGING SPEED (FPHR):
DEPTH CONTROL USED (YES/NO):
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
PCM PULSE CODE MODULATOR
GR GAMMA RAY
CN COMPENSATED NEUTRON
CCL CASING COLLAR LOC.
$
03-JAN-95
FSYS JlV2 BETA RELEASE 4
1502 03-JAN-95
10331.0
10335.0
9450.0
10334.0
900.0
YES
TOOL NUMBER
3507XA
1310XA
2418XA
2323XA
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
LOGGER'S CASING DEPTH (FT):
0.000
10475.0
0.0
BOREHOLE CONDITIONS
FLUID TYPE:
FLUID DENSITY (LB/G):
SURFACE TEMPERATURE (DEGF):
BOTTOM HOLE TEMPERATURE (DEGF):
FLUID SALINITY (PPM):
FLUID LEVEL (FT):
FLUID RATE AT WELLHEAD (BPM):
WATER CUTS (PCT):
GAS/OIL RATIO:
CHOKE (DEG):
SEAWATER/CRUDE
0.00
0.0
0.0
0
0.0
0.000
0.000
0.000
0.0
NEUTRON TOOL
TOOL TYPE (EPITHERMAL OR THERMAL):
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
THERMAL
SANDSTONE
0.00
0.000
BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE
TOP NORMALIZING WINDOW (FT):
BASE NORMALIZING WINDOW (FT):
0.0
0.0
BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER
FAR COUNT RATE LOW SCALE (CPS): 4
FAR COUNT RATE HIGH SCALE (CPS): 400
NEAR COUNT RATE LOW SCALE (CPS): 50
NEAR COUNT RATE HIGH SCALE (CPS): 1050
TOOL STANDOFF (IN):
0.0
REMARKS:
PASS 2 (REPEAT PASS, AFTER PUMPING 160 BBLS).
$
CN
WN
FN
COUN
STAT
: BP EXPLORATION (ALASKA)
: G - 24 (11-18-11-14)
: PRUDHOE BAY
: NORTH SLOPE
: ALASKA
* FORMAT RECORD (TYPE# 64 )
ONE DEPTH PER FRAME
Tape depth ID: F
9 Curves:
Name Tool Code Samples Units
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
1 GR 2418 68 1 GAPI
2 CNC 2418 68 1 PU-S
3 CN 2418 68 1 PU-L
4 LSN 2418 68 1 CPS
5 SSN 2418 68 1 CPS
6 CCL 2418 68 1
7 SPD 2418 68 1 F/MN
8 TTEN 2418 68 1 LB
9 TEN 2418 68 1 LB
4 4 19 991 67 5
4 4 86 720 65 6
4 4 31 149 96 6
4 4 27 466 87 5
4 4 28 122 23 5
4 4 79 150 21 1
4 4 65 866 87 0
4 4 31 402 87 0
4 4 31 402 87 0
36
* DATA RECORD (TYPES 0) 1006 BYTES *
Total Data Records: 145
Tape File Start Depth = 10345.000000
Tape File End Depth = 9440.000000
Tape File Level Spacing = 0.250000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68 67681 datums
Tape Subfile: 9
Minimum record length:
Maximum record length:
220 records...
62 bytes
1006 bytes
Tape Subfile 10 is type: LIS
FILE HEADER
FILE NUMBER: 9
RAW CURVES
Curves and log header data for each pass in seperate files; raw background
pass in last file.
PASS NUMBER: 3
DEPTH INCREMENT: 0.2500
FILE SUMMARY
VENDOR TOOL CODE START DEPTH
GR 10140.0
2418 10140.0
$
LOG HEADER DATA
STOP DEPTH
10331.5
10339.5
DATE LOGGED:
SOFTWARE VERSION:
TIME LOGGER ON BOTTOM:
TD DRILLER (FT):
TD LOGGER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
LOGGING SPEED (FPHR):
DEPTH CONTROL USED (YES/NO):
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
PCM PULSE CODE MODULATOR
GR GAMMARAY
CN COMPENSATED NEUTRON
CCL CASING COLLAR LOC.
$
03-JAN-95
FSYS JlV2 BETA RELEASE 4
1227 03-JAN-95
10331.0
10335.0
9450.0
10334.0
900.0
YES
TOOL NUMBER
3507XA
1310XA
2418XA
2323XA
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
LOGGER'S CASING DEPTH (FT):
0.000
10475.0
0.0
BOREHOLE CONDITIONS
FLUID TYPE:
FLUID DENSITY (LB/G):
SURFACE TEMPERATURE (DEGF):
BOTTOM HOLE TEMPERATURE (DEGF):
FLUID SALINITY (PPM):
FLUID LEVEL (FT):
FLUID RATE AT WELLHEAD (BPM):
WATER CUTS (PCT):
GAS/OIL RATIO:
CHOKE (DEG):
SEAWATER/CRUDE
0.00
0.0
0.0
0
0.0
0.000
0.000
0.000
0.0
NEUTRON TOOL
TOOL TYPE (EPITHERMAL OR THERMAL):
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
THERMAL
SANDSTONE
0.00
0.000
BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE
TOP NORMALIZING WINDOW (FT) .'
BASE NORMALIZING WINDOW (FT):
0.0
0.0
BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER
FAR COUNT RATE LOW SCALE (CPS): 4
FAR COUNT RATE HIGH SCALE (CPS): 400
NEAR COUNT RATE LOW SCALE (CPS): 50
NEAR COUNT RATE HIGH SCALE (CPS): 1050
TOOL STANDOFF (IN): 0.0
REMARKS: PASS 3 (FIRST TUBING TAIL PASS, AFTER PUMPING
115 BBLS).
$
CN
WN
FN
COUN
STAT
: BP EXPLORATION (ALASKA)
: G - 24 (11-18-11-14)
: PRUDHOE BAY
: NORTH SLOPE
: ALASKA
* FORMAT RECORD (TYPES 64 )
ONE DEPTH PER FRAME
Tape depth ID: F
9 Curves:
Name Tool Code Samples Units
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
1 GR 2418 68 1 GAPI
2 CNC 2418 68 1 PU-S
3 CN 2418 68 1 PU-L
4 LSN 2418 68 1 CPS
5 SSN 2418 68 1 CPS
6 CCL 2418 68 1
7 SPD 2418 68 1 F/MN
8 TTEN 2418 68 1 LB
9 TEN 2418- 68 1 LB
4
4
4
4
4
4
4
4 4
4 4
36
4 19 991 67 5
4 86 720 65 6
4 31 149 96 6
4 27 466 87 5
4 28 122 23 5
4 79 150 21 1
4 65 866 87 0
31 402 87 0
31 402 87 0
* DATA RECORD (TYPES 0) 1006 BYTES *
Total Data Records: 34
Tape File Start Depth = 10348.000000
Tape File End Depth = 10139.000000
TaPe File Level Spacing = 0.250000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68 78543 datums
Tape Subfile: 10
Minimum record length:
Maximum record length:
110 records...
62 bytes
1006 bytes
Tape Subfile 11 is type: LIS
FILE HEADER
FILE NUMBER: 10
RAW CURVES
Curves and log header data for each pass in seperate files; raw background
pass in last file.
PASS NUMBER: 4
DEPTH INCREMENT: 0.2500
FILE SUMMARY
VENDOR TOOL CODE START DEPTH
GR 10147.0
2418 10147.0
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE VERSION:
TIME LOGGER ON BOTTOM:
TD DRILLER (FT):
TD LOGGER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
LOGGING SPEED (FPHR):
DEPTH CONTROL USED (YES/NO):
STOP DEPTH
10330.5
10338.5
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
PCM PULSE CODE MODULATOR
GR GAMMARAY
CN COMPENSATED NEUTRON
CCL CASING COLLAR LOC.
$
03-JAN-95
FSYS JlV2 BETA.RELEASE 4
1303 03-JAN-95
10331.0
10335.0
9450.0
10334.0
900.0
YES
TOOL NUMBER
3507XA
1310XA
2418XA
2323XA
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE (IN):
DRILLER'S CASING DEPTH (FT):
LOGGER'S CASING DEPTH (FT):
0.000
10475.0
0.0
BOREHOLE CONDITIONS FLUID TYPE:
FLUID DENSITY (LB/G):
SURFACE TEMPERATURE (DEGF):
BOTTOM HOLE TEMPERATURE (DEGF):
FLUID SALINITY (PPM):
FLUID LEVEL (FT):
FLUID RATE AT WELLHEAD (BPM) :
WATER CUTS (PCT):
GAS/OIL RATIO:
CHOKE (DEG):
SEAWATER/CRUDE
0.00
0.0
0.0
0
0.0
0.000
0.000
0.000
0.0
NEUTRON TOOL
TOOL TYPE (EPITHERMAL OR THERMAL):
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
THERMAL
SANDSTONE
0.00
0.000
BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE
TOP NORMALIZING WINDOW (FT):
BASE NORMALIZING WINDOW (FT):
0.0
0.0
BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER
FAR COUNT RATE LOW SCALE (CPS): 4
FAR COUNT RATE HIGH SCALE (CPS): 400
NEAR COUNT RATE LOW SCALE (CPS): 50
NEAR COUNT RATE HIGH SCALE (CPS) : 1050
TOOL STANDOFF (IN):
0.0
REMARKS:
PASS 4 (SECOND TUBING TAIL PASS, AFTER PUMPING
137 BBLS).
$
CN
WN
FN
COUN
STAT
: BP EXPLORATION (ALASKA)
: G - 24 (11-18-11-14)
: PRUDHOE BAY
: NORTH SLOPE
: ALASKA
* FORMAT · RECORD (TYPE# 64 )
ONE DEPTH PER FRAME
Tape depth ID: F
9 Curves:
Name Tool Code Samples Units
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
1 GR 2418 68 1 GAPI
2 CNC 2418 68 1 PU-S
3 CN 2418 68 1 PU-L
4 LSN 2418 68 1 CPS
5 SSN 2418 68 1 CPS
6 CCL 2418 68 1
7 SPD 2418 68 1 F/MN
8 TTEN 2418 68 1 LB
9 TEN 2418 68 1 LB
4 4 19 991 67 5
4 4 86 720 65 6
4 4 31 149 96 6
4 4 27 466 87 5
4 4 28 122 23 5
4 4 79 150 21 1
4 4 65 866 87 0
4 4 31 402 87 0
4 4 31 402 87 0
36
* DATA RECORD (TYPE# O) 1006 BYTES *
Total Data Records: 33
Tape File Start Depth = 10347.000000
Tape File End Depth = 10146.000000
Tape File Level Spacing = 0.250000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68 75732 datums
Tape Subfile: 11
Minimum record length:
Maximum record length:
109 records...
62 bytes
1006 bytes
Tape Subfile 12 is type: LIS
FILE HEADER
FILE NUMBER: 11
RAW CURVES
Curves and log header data for each pass in seperate files; raw background
pass in last file.
PASS NUMBER: 5
DEPTH INCREMENT: .2500
FILE SUMMARY
VENDOR TOOL CODE START DEPTH
GR 10114.0
2418 10123.0
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE VERSION:
TIME LOGGER ON BOTTOM:
TD DRILLER (FT):
TD LOGGER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
LOGGING SPEED (FPHR):
DEPTH CONTROL USED (YES/NO):
STOP DEPTH
10329.0
10337.0
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
PCM PULSE CODE MODULATOR
GR GAMMA RAY
CN COMPENSATED NEUTRON
CCL CASING COLLAR LOC.
$
BOREHOLE AND CASING DATA
OPEN HOLE BIT SIZE(IN):
DRILLER'S CASING DEPTH (FT):
LOGGER'S CASING DEPTH (FT):
BOREHOLE CONDITIONS FLUID TYPE:
FLUID DENSITY (LB/G):
SURFACE TEMPERATURE (DEGF):
BOTTOM HOLE TEMPERATURE (DEGF):
FLUID SALINITY (PPM):
FLUID LEVEL (FT):
FLUID RATE AT WELLHEAD (BPM):
WATER CUTS (PCT):
GAS/OIL RATIO:
CHOKE (DEG):
NEUTRON TOOL
TOOL TYPE (EPITHERMALOR THERMAL):
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
03-JAN-95
FSYS JlV2 BETA RELEASE 4
1316 03-JAN-95
10331.0
10335.0
9450.0
10334.0
900.0
YES
TOOL NUMBER
3507XA
1310XA
2418XA
2323XA
.000
10475.0
.0
SEAWATER/CRUDE
.00
.0
.0
0
.0
.000
.000
.000
.0
THERMAL
SANDSTONE
.00
.000
BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE
TOP NORMALIZING WINDOW (FT) :
BASE NORMALIZING WINDOW (FT) :
.0
.0
BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER
FAR COUNT RATE LOW SCALE (CPS): 4
FAR COUNT RATE HIGH SCALE (CPS): 400
NEAR COUNT RATE LOW SCALE (CPS): 50
NEAR COUNT RATE HIGH SCALE (CPS): 1050
TOOL STANDOFF (IN):
.0
REMARKS:
PASS 5 (THIRD TUBING TAIL PASS, LOGGED DOWN,
AFTER PUMPING 137 BBLS).
$
CN
WN
FN
COUN
STAT
: BP EXPLORATION (ALASKA)
G - 24 (11-18-11-14)
: PRUDHOE BAY
: NORTH SLOPE
: ALASKA
* FORMAT RECORD (TYPE# 64)
ONE DEPTH PER FRAME
Tape depth ID: F
9 Curves-.
Name Tool Code Samples Units
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
1 GR 2418 68 1 GAPI
2 CNC 2418 68 1 PU-S
3 CN 2418 68 1 PU-L
4 LSN 2418 68 1 CPS
5 SSN 2418 68 1 CPS
6 CCL 2418 68 1
7 SPD 2418 68 1 F/MN
8 TTEN 2418 68 1 LB
9 TEN 2418 68 1 LB
4 4 19 991 67 5
4 4 86 720 65 6
4 4 31 149 96 6
4 4 27 466 87 5
4 4 28 122 23 5
4 4 79 150 21 1
4 4 65 866 87 0
4 4 31 402 87 0
4 4 31 402 87 0
36
* DATA RECORD. (TYPE# 0) 1006 BYTES *
Total Data Records: 38
Tape File Start Depth = 10343.000000
Tape File End Depth = 10111.000000
Tape File Level Spacing = 0.250000
Tape File DePth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68 87834 datums
Tape Subfile: 12
Minimum record length:
Maximum record length:
114 records...
62 bytes
1006 bytes
Tape Subfile 13 is type: LIS
95/ 1/18
01
**** REEL TRAILER ****
95/ 1/18
01
Tape Subfile: 13 2 records...
Minimum record length: 132 bytes
Maximum record length: 132 bytes
End of execution: Wed 18 JAN 95 2:49p
Elapsed execution time = 14.89 seconds.
SYSTEM RETURN CODE = 0
PROGRAM: LIS REVISION: 4.1
PART NUMBER: W5550-MICRO
Start of execution:
Tue 9 OCT 90 2:27pm
WELL DATA FILE: C:\WDSDATA\W04600.WDF
ECC: 4600.00
COMPANY NAME:
WELL NAME:
FIELD:
LOCATION:
BP EXPLORATION (ALASKA)
G- 24 (11-18-11-14)
Top of Well:
Bottom of Well:
Level Spacing:
9470.000
10360.000
0.500
NUMBER OF CURVES: 13
DEPTH CCL CLSN CN CNC
LSN SPD SSN TEN TTEN
CNRA
CSSN GR
COMPANY:BP EXPLORATION (ALASKA)
WELL:G - 24 (11-18-11-14)
FIELD:PRUDHOEBAY
COUNTY:N.SLOPE
STATE:ALASKA
TAPE INFORMATION
RECEIVED
OCT 1 9 1990
Alaska Oil & Gas Cons. Commission
Anchorage
FILE:PASS 1.001
FILE INTERVAL: START= 10360.000 END= 9470.000
DEPT GR SPD TEN TTEN CLSN CSSN CN
CNC CNRA LSN SSN CCL
10360.000 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250
-999.250 -999.250 -999.250 -999.250 -999.250
10335.000 47.964 29.888 419.775 1145.847 17.102 262.542 36.686
37.603 0.065 68.406 262.542 11.000
10310.000 45.881 28.997 264.872 1264.207 13.771 186.369 30.236
31.364 0.074 55.086 186.369 396.000
10285.000 34.716 28.997 119.115 1225.765 19.084 224.888 24.591
25.984 0.085 76.334 224.888 12.000
10260.000 29.433 28.997 85.342 1276.245 15.280 200.709 28.919
30.102 0.076 61.120 200.709 248.000
10235.000 40.491 28.233 45.226 1282.862 17.707 210.944 24.996
26.368 0.084 70.828 210.944 17.000
10210.000 23.355 28.233 -3.025 1265.346 17.149 212.497 26.512
27.807 0.081 68.597 212.497 1.000
10185.000 17.059 28.342 -3.692 1282.646 28.665 251.725 15.307
17.298 0.114 114.661 251.725 3.000
10160.000 17.475 28.106 -20.487 1244.729 30.837 263.415 14.574
16.620 0.117 123.349 263.415 1.000
10135.000 22.691 28.997 -27.714 1249.414 23.119 236.768 19.795
21.471 0.098 92.475 236.768 1.000
10110.000 28.439 28.997 -12.613 1275.958 25.974 246.597 17.493
19.325 0.105 103.898 246.597 3.000
10085.000 15.456 28.997 -26.622 1276.879 27.444 248.246 16.116
18.047 0.111 109.777 248.246 70.000
10060.000 17.705 28.997 -20.454 1258.718 27.029 250.251 16.770
18.653 0.108 108.118 250.251 3.000
· 10035.000 17.529 28.997 -20.423 1262.379 30.301 265.146 15.212
17.209 0.114 121.204 265.146 1.000
10010.000 21.169 28.997 -15.987 1251.695 32.086 267.390 13.936
16.032 0.120 128.345 267.390 1.000
9985.000 16.834 28.997 -19.337 1245.892 32.226 265.373 13.634
15.754 0.121 128.906 265.373 1.000
9960.000 49.717 28.997 -32.726 1236.431 16.677 205.670 26.326
27.630 0.081 66.707 205.670 '0.000~
9935.000 17.224 28.997 -18.970 1263.038 39.276 292.504 11.240
13.556 ~0.134 157.104 292.504 1.000
9910.000 20.448 28.997 -19.960 1240.642 38.406 288.076 11.402
13.704 0.133 153.625 288.076 3.000
9885.000 18.500 28.997 -29.451 1213.341 34.290 270.353 12.566
14.772 0.127 137.159 270.353 0.000
9860.000 25.568 28.997 -28.650 1204.635 28.452 245.473 14.836
16.862 0.116 113.808 245.473 9.000
9835.000 20.398 28.997 -15.693 1222.896 37.480 280.005 11.311
13.621 0.134 149.921 280.005 1.000
9810.000 18.611 28.997 -16.192 1217.977 31.375 257.946 13.593
15.716 0.122 125.500 257.946 1.000
9785.000 27.633 28.997 -15.444 1213.995 29.138 252.901 14.994
17.008 0.115 116.554 252.901 0.000
9760.000 27.096 28.997 -20.289 1216.272 28.474 253.102 15.636
17.602 0.113 113.898 253.102 1.000
G- 24 (11-18-11-14)
DEPT GR SPD TEN TTEN CLSN CSSN CN
CNC CNRA LSN SSN CCL
9735.000 26.215 28.997 -32.264 1174.793 32.079 267.713 13.972
16.065 0.120 128.318 267.713 1.000
9710.000 30.387 28.997 -14.747 1209.194 33.252 274.632 13.709
15.823 0.121 133.007 274.632 3.000
9685.000 22.825 28.997 -30.679 1189.308 33.894 280.507 13.760
15.870 0.121 135.577 280.507 21.000
9660.000 27.996 28.997 -30.223 1160.245 30.952 258.803 14.021
16.111 0.120 123.808 258.803 1.000
9635.000 57.661 28.997 -42.309 1133.246 39.049 312.914 12.959
15.133 0.125 156.195 312.914 1.000
9610.000 113.246 29.997 -42.785 1136.564 34.504 288.743 14.042
16.130 0.119 138.017 288.743 7.000
9585.000 102.545 29.997 -47.502 1128.357 18.011 207.079 23.691
25.133 0.087 72.045 207.079 0.000
9560.000 47.930 29.106 -38.878 1127.889 28.204 263.196 16.995
18.862 0.107 112.818 263.196 1.000
9535.000 52.776 29.997 -42.382 1101.676 23.430 231.149 18.636
20.389 0.101 93.722 231.149 1.000
9510.000 111.133 29.106 -32.434 1092.107 10.272 149.127 33.624
34.629 0.069 41.088 149.127 1.000
9485.000 0.000 0.000 -100.000 0.000 0.000 50.000 0.000
0.000 0.000 0.000 50.000 150.000
9470.000 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250
-999.250 -999.250 -999.250 -999.250 -999.250
WELL DATA FILE:
ECC:
COMPANY NAME:
WELL NAME:
FIELD:'
LOCATION:
Top of Well:
Bottom of Well:
Level Spacing:
C: \WDSDATA\W04601. WDF
4601.00
BP EXPLORATION (ALASKA)
G- 24 (11-18-11-14)
9480.000
10350.000
0.500
NUMBER OF CURVES: 13
DEPTH CCL CLSN CN CNC
LSN SPD SSN TEN TTEN
CNRA
CSSN
GR
FILE:PASS 2.002
FILE INTERVAL:
START= 10350.000
END=
9480.000
DEPT GR SPD TEN TTEN CLSN
CNC CNRA CCL LSN SSN
10350.000
-999.250
-999.250
-999.250
-999.250
10325.000 47.086 26.997
31.482 0.074
10300.000 41.356 25.997
30.301 0.076
10275.000 93.926 25.997
31.204 0.074
10250.000 28.896 26.997
30.321 0.076
10225.000 21.083 27.997
33.054 0.071
10200.000 18.279 27.997
24.997 0.087
10175.000 21.824 27.991
20.165 0.102
10150.000 18.320 27.997
17.836 0.111
-999.250
-999.250
256.299
5.000
113.033
45.000
28.444
3.000
-2.029
3.000
-24.313
1.000
-16.905
3.000
-14.092
3.000
-27.432
5.000
-999.250
-999.250
1066.468
55.775
1062.038
59.254
1044.033
49.212
1046.858
55.670
1035.082
54.365
1040.395
74.445
1035.980
96.365
1010.953
117.410
-999.250
-999.250
13.944
189.216
14.813
195.519
12.303
165.883
13.917.
183.778
13.591
190.977
18.611
213.121
24.091
235.784
29.352
263.323
CSSN
-999.250
189.216
195.519
165.883
183.778
190.977
213.121
235.784
263.323
CN
-999.250
30.359
29.127
30.069
29.147
31.993
23.547
18.395
15.888
10125.000
10100.000
10075.000
10050.000
10025.000
10000.000
9975.000
9950.000
9925.000
9900.000
9875.000
9850.000
9825.000
9800.000
9775.000
9750.000
G - 24
DEPT
9725.000
9700.000
21.967
21.703
20.442
19.782
18.782
18.588
17.595
17.860
20.016
16.067
17.967
16.444
16.246
14.961
18.093
14.018
19.768
15.446
21.555
11.606
23.303
16.448
20.947
15.926
47.005
17.935
29.682
15.018
24.139
16.304
29.323
14.847
(11-18-11-14)
GR
CNC
21.106
14.757
24.157
14.191
28.033
0.097
28.991
0.104
28.997
0.108
28.997
0.111
28.997
0.120
28.403
0.118
28.997
0.126
28.997
0.131
28.997
0.123
28.997
0.148
28.997
0.118
28.997
0.121
28.997
0.111
28.997
0.125
28.997
0.119
28.039
0.126
SPD
CNRA
28.997
0. 127
28.039
0.130
-27.038
0.000
'-43.085
5.000
-23.322
19.000
-24.983
1.000
-32.317
3.000
-25.098
1.000
-21.990
3.000
-16.907
21.000
-6.627
3.000
-29.552
15.000
-30.522
1.000
-27.455
37.000
-27.751
1.000
-31.602
1.000
-25.910
0.000
-29.501
11.000
TEN
CCL
-31.316
1.000
-13.433
1.000
10'13.113
82.902
991.850
105.474
lOO8.857
115.340
1019.897
111.421
999.227
129.030
998.536
124.510
1001.165
130.935
1002.307
159.502
1016.513
133.645
991.110
183.744
992.652
126.368
986.347
126.976
992.899
110.354
993.666
142.995
986.225
126.914
998.580
146.796
TTEN
LSN
981.398
140.282
989.759
148.964
20.726
213.920
26.368
254.549
28.835
266.304
27.855
250.134
32.257
269.223
31.127
263.947
32.734
260.297
39.875
303.602
33.411
271.467
45.936
309.442
31.592
267.931
31.744
263.348
27.588
248.469
35.749
285.007
31.728
267.477
36.699
290.342
CLSN
SSN
35.071
276.320
37.241
285.869
213.920
254.549
266.304
250.134
269.223
263.947
260.297
303.602
271.467
309.442
267.931
263.348
248.469
285.007
267.477
290.342
CSSN
276.320
285.869
20.042
17.984
16'699
15.915
13.974
14.382
12.772
11.744
13.299
9.104
14.387
13.821
15.996
12.834
14.231
12.648
CN
12.550
11.933
9675.000 25.487' 28.997 -31.070
14.225 0.130 0.000
9650.000 96.478 28.997 -14.438
19.326 0.105 0.000
9625.000 78.344 28.997 -19.077
13.378 0.135 5.000
9600.000 178.049 29.033 -24.283
38.046 0.065 0.000
9575.000 88.591 28.997 -28.245
34.057 0.070 1.000
9550.000 47.183 29.997 -14.041
23.941 0.090 0.000
9525.000 49.912 29.555 -22.572
16.842 0.116 1.000
9500.000 81.616 0.000 -100.000
60.466 0.050 150.000
9480.000 -999.250 -999.250 -999.250
-999.250 -999.250 -999.250
WELL DATA FILE: C:\WDSDATA\W04602.WDF
ECC: 4602.00
COMPANY NAME:
WELL NAME:
FIELD:
LOCATION:
BP EXPLORATION (ALASKA)
G - 24 (11-18-11-14)
Top of Well:
Bottom of Well:
Level Spacing:
9480.000
10350.000
0.500
960.584
155.500
989.269
106.774
986.510
175.945
959.087
45.985
962.002
48.501
973.396
80.009
958.700
115.711
0.000
23.068
-999.250
-999.250
38.875
298.879
26.693
253.436
43.986
324.751
11.496
177.856
12.125
174.001
20.002
221.856
28.928
249.378
5.767
114.679
-999.250
-999.250
298.879
253.436
324.751
177.856
174.001
221.856
249.378
114.679
-999.250
11.970
17.495
11.045
37. 140
33.033
22.427
14.814
59.517
-999.250
NUMBER OF CURVES: 13
DEPTH CCL CLSN CN CNC
LSN SPD SSN TEN TTEN
CNRA
CSSN
GR
FILE:PASS 3.003
·
FILE INTERVAL:
START= 10350.000
END=
9480.000
DEPT GR SPD TEN TTEN CLSN
CNC CNRA CCL LSN SSN
10350.000
-999.250 -999.250 -999.250 -999.250 -999.250
-999.250 -999.250 -999.250 -999.250 -999.250
CSSN
-999.250
CN
-999.250
10325.000
52.115
29.270
28.997 218.511 1107.466 14.743
0.078 0.000 58.973 189.723
189.723
28.048
10300.000
38.369
28. 187
29.997 103.251 1095.894 15.933
0.080 5.000 63.730 199.412
199.412
26.912
10275.000
91.473
33.563
28.997 36.084 1092.238 12.699
0.070 9.000 50.797 180.380
180.380
32.521
10250.000
26.220
28.728
28.997 7.025 1099.442 15.095
0.079 29.000 60.379 191.593
191.593
27.480
10225.000
23.704
29.962
28.997 -9.167 1094.815 15.252
0.076 53.000 61.008 199.658
199.658
28.772
10200.000
20.263- 28.597 -19.195 1102.097 20.564
23.896 0.090 3.000 82.255 227.766
227.766
22.378
10175.000
18.034
20.843
28.997 -19.555 1093.980 25.063
0.100 17.000 100.252 251.212
251.212
19.122
10150.000
22.251
17.169
28.961 -6.487 1110.011 31.069
0.114 17.000 124.277 271.425
271.425
15.168
10125.000
21.112
22.531
28.997 -25.775 1086.788 21.307
0.094 35.000 85.228 226.015
226.015
20.926
1o100.00o
22.845
21.661
29.397 -14.066 1095.381 25.226
0.097 3.00'0 100.906 260.012
260.012
19.998
10075.000
20.722
17.287
28.997 -22.238 1087.406 31.912
0.114 1.000 127.649 280.120
280.120
15.296
10050.000
20.913
17.183
29.397 -19.046 1102.281 29.628
0.114 1.000 118.514 258.982
258.982
15.183
10025.000
21.310
15.101
28.997 -25.502 1086.809 34.768
0.125 11.000 139.073 278.220
278.220
12.925
10000.000
19.785
15.704
29.997 -18.784 1095.222 32.927
0.122 3.000 131.709 270.556
270.556
13.579
9975.000
19.157
16.077
29.961 -19.857 1087.292 32.566
0.120 1.000 130.263 271.907
271.907
13.985
9950.000
18.729
13.008
29.997 -20.972 1091.626 43.149
0.138 1.000 172.596 312.789
312.789
10.641
9925.000
19.134
15.818
29.961 -17.834 1103.999 34.288
0.121 1.000 137.151 283.126
283.126
13.703
9900.000
21.368
11.580
29.555 -13.189 1104.782 48.787
0.149 0.000 195.150 328.183
328.183
9.075
9875.000
20.785
14.797
29.961 -26.622 1089.147 35.815
0.127 1.000 143.259 282.700
282.700
12.594
9850.000
23.917
16.688
29.955 -22.365 1088.580 32.266
0.117 0.000 129.062 276.388
276.388
14.647
9825.000 44.125 29.397 -19.322 1092.383 29.183 259.768 15.675
17.638 0.112 5.000 116.730 259.768
9800.000 27.219 28.997 -24.078 '1081.887 39.279 300.944 11.889
14.151 0.131 5.000 157.117 300.944
9775.000 25.862 29.591 -21.925 1091.380 31.320 272.083 15.018
17.030 0.115 1.000 125.281 272.083
9750.000 23.361 29.591 -15.105 1083.342 38.159 298.606 12.387
14.607 0.128 7.000 152.635 298.606
G - 24 (11-18-11-14)
DEPT GR SPD TEN TTEN CLSN CSSN CN
CNC CNRA CCL LSN SSN
9725.000 19.955 29.591 -27.904 1078.667 37.074 290.809 12.443
14.659 0.127 25.000 148.296 290.809
9700.000 26.218 29.039 -9.641 1089.164 38.746 295.051 11.748
14.021 0.131 164.000 154.985 295.051
9675.000 31.329 29.033 -22.906 1075.367 40.550 304.438 11.422
13.723 0.133 23.000 162.202 304.438
9650.000 93.515 29.997 -22.270 1083.339 28..467 260.351 16.424
18.332 0.109 1.000 113.867 260.351
9625.000 72.334 29.997 -23.530 1096.648 45.590 343.361 11.495
13.789 0.133 11.000 182.360 343.361
9600.000 235.161 29.997 -34.740 1062.589 13.177 190.434 33.389
34.402 0.069 0.000 52.709 190.434
9575.000 83.359 29.997 -33.920 1052.150 12.339 179.756 33.802
34.801 0.069 1.000 49.357 179.756
9550.000 51.515 29.997 -24.353 1062.979 20.777 226.085 21.775
23.328 0.092 3.000 83.107 226.085
9525.000 44.284 29.997 -28.419 1053.246 29.502 256.004 14.989
17.003 0.115 5.000 118.007 256.004
9500.000 80.177 0.000 -100.000 0.000 5.760 118.558 64.519
65.637 0.049 2.000 23.041 118.558
9480.000 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250
-999.250 -999.250 -999.250 -999.250 -999.250
WELL DATA FILE: C:\WDSDATA\W04603.WDF
ECC: 4603.00
COMPANY NAME:
WELL NAME:
FIELD:
LOCATION:
BP EXPLORATION (ALASKA)
G - 24 (11-18-11-14)
Top of Well:
Bottom of Well:
Level Spacing:
9480.000
10350.000
0.500
NUMBER OF CURVES: 13
DEPTH CCL CLSN CN CNC
LSN SPD SSN TEN TTEN
CNRA
CSSN
GR
FILE:PASS 4.004
FILE INTERVAL:
START= 10350.000
END=
9480.000
DEPT GR SPD TEN TTEN CLSN
CNC CNRA CCL LSN SSN
10350.000
-999.250 -999.250 -999.250 -999.250 -999.250
-999.250 -999.250 -999.250 -999.250 -999.250
10325.000 57.114 28.997 251.269
31.149 0.074 9.000
1138.461
58.185
10300.000 41.228 28.997 125.149 1134.038
27.946 0.080 246.000 63.090
10275.000 88.202 28.997 34.039
32.571 0.072 5.000
10250.000 31.219 28.997 17.173
29.575 0.077 3.000
10225.000 20.629 28.997 11.850
30.720 0.075 1.000
1116.406
49.713
1133.883
58.911
1159.023
61.000
14.546
195.880
15.772
196.159
12.428
172.816
14.728
190.970
15.250
203.301
10200.000 20.116 28.997 -12.669 1126.511 20.366
24.591 0.088 1.000 81.466 230.412
1123.709
101.527
1112.877
122.188
1128.129
91.189
1112.348
106.190
1120.562
131.871
10175.000 18.785 28.997 -23.651
19.968 0.103 7.000
10150.000 20.267 29.106 -29.267
17.850 0.111 1.000
10125.000 19.997 29.106 -26.446
20.996 0.099 0.000
10100.000 22.000 29.997 -19.684
21.280 0.098 9.000
10075.000 18.407 29.997 -18.650
16.870 0.116 5.000
25.382
246.668
30.547
274.191
22.797
229.714
26.548
270.119
32.968
284.523
CSSN
-999.250
195.880
196.159
172.816
190.970
203.301
230.412
246.668
274.191
229.714
270.119
284.523
CN
-999.250
30.012
26.659
31.492
28.367
29.564
23.117
18.184
15.903
19.286
19.590
14.844
10050. 000 17. 611 29. 997 -37. 708 1085. 871 30. 857 264 . 763 14. 691
16. 728 0. 117 0. 000 123. 428 264. 763
10025.000
10000.000
9975.000
9950.000
9925.000
9900.000
9875.000
9850.000
9825.000
9800.000
9775.000
9750.000
G - 24
DEPT
9725.000
9700.000
9675.000
9650.000
9625.000
27.718
16.571
19.309
15.758
21.906
16.865
20.193
13.375
18.887
16.939
22.163
11.509
22.843
15.099
21.122
15.705
43.421
17.362
27.533
14.691
27.356
16.427
25.282
15.306
(11-18-11-14)
GR
CNC
23.386
14.085
28.562
14.438
26.180
14.224
95.765
17.695
69.673
12.965
29.997
0.117
29.888
0.121
29.888
0.116
29.997
0.135
29.997
0.116
29.997
0.149
29.997
0.125
29.997
0.122
29.761
0.114
29.997
0.127
29.997
0.118
29.997
0.124
SPD
CNRA
29.997
0.131
29.997
0.129
29.997
0.130
29.997
0.112
30.997
0.138
-23.860
3.000
-31.903
3.000
-29.568
1.000
-17.977
1.000
-23.886
1.000
-25.924
3.000
-23 225
11.000
-27.736
9.000
-23.325
0.000
-26.541
1.000
-29.453
7.000
-18.173
21.000
TEN
CCL
-27.675
1.000
-22.589
95.000
-28.854
3.000
-23.110
1.000
-35.378
1.000
1099.271
135.248
1090.739
134.324
1086.955
126.244
1098.190
171.976
1079.929
133.440
1068.887
197.342
1069.495
147.229
1086.071
134.842
1085.707
115.432
1065.072
157.055
1059.749
131.961
1079.240
149.877
TTEN
LSN
1057.448
150.282
1059.012
155.639
1031.283
162.749
1062.565
118.529
1009.802
188.107
33.812
288.237
33.581
276.576
31.561
272.333
42.994
317.385
33.360
288.723
49.336
330.574
36.807
294.506
33.710
277.009
28.858
254.073
39.264
308.436
32.990
279.553
37.469
302.567
CLSN
SSN
37.571
286.963
38.910
302.120
40.687
312.807
29.632
264.365
47.027
340.166
288.237
276.576
272.333
317.385
288.723
330.574
294.506
277.009
254.073
308.436
279.553
302.567
CSSN
286.963
302. 120
312.807
264.365
340.166
14.520
13.638
14.839
11.043
14.919
8.997
12.922
13.581
15.377
12.478
14.365
13.147
CN
11.817
12.202
11.969
15.736
10.594
9600.000 249.578 29.997 -31.533 1032.633 12.642 186.102 34.352
35.334 0.068 3.000 50.566 186.102
9575.000 92.295 30.652 -25.058 989.071 13.103 180.810 31.130
32.223 0.072 0.000 52.413 180.810
9550.000 47.418 29.997 -25.712 1031.292 20.503 231.123 22.990
24.471 0.089 1.000 82.013 231.123
9525.000 50.804 30.888 -29.784 1021.163 29.351 259.458 15.486
- 17.463 0.113 0.000 117.404 259.458
9500.000 86.743 0.000 -100.000 0.000 6.776 126.720 52.141
52.946 0.053 13.000 27.105 126.720
9480.000 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250 -999.250
-999.250 -999.250 -999.250 -999.250 -999.250
WELL DATA FILE:
ECC:
C: \WDSDATA\W04604. WDF
4604.00
COMPANY NAME:
WELL NAME:
FIELD:
LOCATION:
Top of Well:
Bottom of Well:
Level Spacing:
9470.000
10360.000
0.500
NUMBER OF CURVES: 17
DEPTH AMAX CN CN01 CN02
CNC01 CNC02 CNC03 CNCAV GR
NUM
CN03 CNAV CNC
GR01 GR02 GR03
FILE:AVG .005
FILE INTERVAL: START= 10360.000
END= 9470.000
DEPT. GR CNAV CNCA
10360.000 -999.250 36.410 37.334
10335.000 47.964 34.256 35.242
10310. 000 45. 881 29. 512 30. 671
10285.000 34.716 24.400. 25.803
10260.000 29.433 27.650 28.893
10235.000 40.491 24.156 25.573
10210.000 23.355 25.783 27.114
10185.000 17.059 14.817 16.845
10160.000 17.475 15.325 17.315
10135.000 22.691 19.556 21.248
10110.000 28.439 18.024 19.820
10085.000 15.456 16.179 18.105
10060.000 17.705 16.660 18.551
10035.000 17.529 14.409 16.468
10010.000 21.169 14.502 16.554
9985.000 16.834 13.624 15.745
9960.000 49.717 24.514 25.915
9935.000 17.224 11.230 13.547
9910.000 20.448 11.423 13.723
9885.000 18.500 12.779 14.968
9860.000 25.568 14.907 16.928
9835.000 20.398 11.360 13.665
9810.000 18.611 14.367 16.430
9785.000 27.633 15.361 17.348
9760.000 27.096 15.597 17.566
9735.000 26.215 13.528 15.656
9710.000 30.387 13.861 15.964
9685.000 22.825 12.693 14.888
9660.000 27.996 15.044 17.055
9635.000 57.661 12.401 14.620
9610.000 113.246 13.797 15.904
9585.000 102.545 24.136 25.553
9560.000 47.930 16.150 18.078
9535.000 52.776 17.633 19.455
9510.000 111.133 30.813 31.918
9485.000 0.000 -999.250 -999.250
9470.000 -999.250 -999.250 -999.250
End of execution: Tue 9 OCT 90 2:27pm
Elapsed execution time = 26.80 seconds.
SYSTEM RETURN CODE = 0
;g----SCHLUMBERGER .....
LIS TAPE
~- VERIFICATION LISTING
VP OlO.H02 VERIFICATION LISTING PAGE
~ REEL HEADER -,~-
ERVICE NAME :EDIT
ATE :86/12/29
RIGIN :
EEL NAME :72134
ONTINUATION # :01
REVIOUS REEL :
,OMMENTS :LIS TAPE,
STANDARD G-24,API
50-029-21671
:~ TAPE HEADER ¢~
;ERVICE NAME :EDIT
FATE :86/12/29
IRIGIN :0000
'APE NAME :2134
;ONTINUATIDN # :01
'REVIOUS TAPE :
· OMMENTS :LIS TAPE,
STANDARD G-24,API 50-029-21671
.... ~ .... ~ .... ~.-,-~. EOF
FILE HEADER~-'"'",,-
;i,:~-E NAME :EDIT
i'?'ER V I C E NAM.E
!,~R,S I ~ N ~ ·
IMUM ,LENGTH
E T Y P E :
':R;EV IOUS FILE
.001
1024
INFORMATION RECORDS '~-
CONTENTS UNIT TYPE ~CATE SIZE CODE
STANDARD ALASKA PRODUCTION CO. 000 000 030 06,5
G~:"2'~ ":"'("I:~I'"-" 1',8'~1'1"'14) ...... 0,6,5
PRUDHOE: BAY 0,65
14E 0~0,0 000 0104'
'11N 000 004
18 000 002 065
N 0 R T H S L' 0 P E 0,0,0 012 '0 6,5
ALASKA 000 006 065
USA 000 000 00,4 0 65
CONTENTS UNIT 'TYPE CATE SIZE CODE
vD nln. Hn~ VERIFICATION LISTING P4GE 2
SCHLUMBERGER *
ALASKA CDMPU'TING CENT-R ~
OMPANY : STANDARD ALASKA PRODUCTION CO
ELL : G-24 (11-18-11-14)
iELD : PRODHOE BAY
OU,NTY = NORTH SLOPE BOROUGH
TATE = ALASKA
NUMBER AT ACC: 72134
#1, DATE LOGGED: 16-DEC-86
DP: L. B. CUDNEY
',ASING : 9.625" @ 9495' - BIT SIZE : 8.5" TO 10475'
'YPE FLUID =OISPERSED
t'"'E'NSITY = 9.0 LB/G RM = 3.340 @ 6T.O DF
'ISCOSITY = 32.0 S RMF = 3.760 @ 67.0 OF
"H : 11.8 RMC : 2.920 @ 67.0' DF
~'~UID LOSS = 14.2 C3 RM AT BHT : 1.373 @ 173. DF
~ATRIX SANDSTONE
· ~,,',--,--..- THIS OATA HAS NOT BEEN DEPTH SHIFTED - OVERLAYS FIELD PR'INTS -,--,--,-",--,-
,VP OiO.HOZ VERIFICATION LISTING PAGE 3
SCHLUMBERGER LOGS INCLUDED WITH THIS MAGNETIC TAPE:
DUAL INDUCTION SPHERICALLY FOCUSED LOG (DZL)
DATA AVAILABLE: 10493''T0 8390'
BOREHOLE COMPENSATED SONIC LOG (BHC)
DATA AVAILABLE: ,10493' TO 8390'
COMPENSATED NE'UTRDN LOG (CNL)
DATA AVAILABLE: 10493' TO 9450'
DATA FORMAT RECORD
!NTRY BLOCKS
TYPE SIZE REPR COOE EN'TRY
2 1 66 0
4 1 66 1
8 ~ 73 60
9 4 65 .lin
16 1 66
0 t 66 0
)AT. UM SPECIFICATION BLOCKS
~NEM SERVICE SERVICE UNIT API API API API FILE SIZE SPL RE,PR
ID ORDER ~ CODE
LOG TYPE CLASS MOD NO.
PROCESS
(OCTAL)
FT O0 000
OHMM O0 220
OHMMoH §0 120
o
OD
O0 0 0
O1 0 0
46 0 0
44 0 0
0,1. o 0;i
OI 0 0
80 0 0
4 1 68 0.00000000000,0'0
~ ! 68 00000000000000
68 0000000,000,0000
68 0000000000000:0
4 68:0000000:000000,0
~ ....... 1' '6'8 0'0'0"0'0"0'00"0'0'"0"00'0
4 ~ 6.8 000000.00000000
VP ~lO.H02 VERIFICATION LISTING PAGE 4
R BHC
R CNL
RAT CNL
NRA CNL
PHI CNL
CNL CNL
CNL CNL
GAPi O0 310 O1 0
GAPi O0 310 O1 0
O0 420 O1 0
O0 000 O0 0
PU O0 890 O0 0
CPS O0 330 31 0
CPS O0 330 30 0
1 68 00000000000000
1 68 00000000000000
1 68 00000000000000
1 68 00000000000000
I 68 00000000000000
1 68 00000000000000
1 68 00000000000000
DATA
EP T
P
R
CNL
10493'.0742 SFLU ' 6.2066 ILD
12.3203 GR 112.5625 DT
-999.2500 NRAT -999.2500 RNRA
-999.2500 FCNL -999.2500
EPT
P
R
CNL
10400.0742 SFLU 6.6013 ILO
12.6719 GR 114.4375 DT
114.4375 NRAT 2'8359 RNRA
2310.0000 FCNL 747.0000
EPT
10300.0742 SFLU 30-4567 ILD
-61.0938 GR 38.4375 DT
38.4375 NRAT 2.5781 RNRA
2548-0000 FCNL 939.0000
10200-0742 SFLU ILO
-63.1562 GR: DT
21.6719: NRAT 2.6230 RNRA
2338.0000 FCNL 938.:000:0
,E P T
!~ N L
10100.0742 SFLU 39.9,064 ILD
-61.5625 GR 21.2344 DT
21.23,44 NRAT 2.26'56 RNRA
279.8.0,0'00 FCNL 11,63.0.00,0
OQOO,..],O?~2,, SEL.U 79.6730 ILD
~7'0"*'37'50' 'GR 2'2". 265'6'" UT '
22.265.6 NRAT 2.1055 RNRA
'2'6'I~?'~:'"~:"0~0'~~''''~ "~,"'~F~N;'t~i ....... ............ t"'2'2 5~'~'~',0~"9!~9
990,0,,' 0742 S :F.L U
7'4,.:ILD
2186,0,000
FCN:L
980:,0.07:~2., SFLU 43°4208
-5'4.8750 GR 30.3125
;'R 30.3125 NRAT 2.1504
ICNL 2746,0000 'FC~NL 1232.0000
~'PT 9700~0742 SF. LU 98..1831
-47.6.250 GR
~ 31.984,4 NRAT
ILD
DT
RNRA
ILO.
DT
RNRA
4.5194 ILM
77.1875 GR
-999.2500 NPHI
6.5828 ILM
76.5000 GR
3.0918 NPHI
17.3422 ILM
93.3750 GR
2-7129 NPHI
1,0.3295
28.9119
81.7500'
2.4043
97.9,34.0
84.500'0
2,.1328
ILM
GR
NPHI
!LM
GR
NPHI
ILM
GR'
N PHI
4.9511
112.5625
-9'99.2500
6.7682
114.4375
31.4453
17.1243
38.4375
27.5391
9-1590
21.6719
28,2227
26.5756
66.8124
0
66.90'06 I'LM 60,6950
97.5000 GR 31.9844
2,2949 NPHI 2'1.6309
38.1953 ILM 3.4-1,685
94. 875 GR 30.'3125
2.2285 NPHI 21.1426
I'LM 26, 1427
GR I9.,3125
NP'H'I 12.5000
VP OIO.H02 VERIFICATION LISTING PAGE 5
CNL 2766.0000 FCNL
EPT 9600.0742 SFLU
P -1.5889 GR
R 486.7500 NRAT
CNL 2262.0000 ECNL
i~PT 9500.0742 SFLU
27.1094 GR
97.4375' NRAT
CNL 1325.0000 FCNL
EPT
EPT
P
PI
}E PT
{P
~t£ N L
!i~,. P T
;P
9400.0742 SFLU
-6.4102 GR
-999.2500 NRAT
-999.2500 FCNL
930.0,0742 SFLU
-14.5078 GR
-999.2500 NRAT
-999.2500 FCNL
9200.0742 SFLU
-I3.2891 GR
-999'2500' NRAT
-9'99-2500 FCNL
9100,074~ SFLU
-18,000 GR
-999'25'00 NRAT
-999.2500 FCNL
90'O0, o0742SFLU
-16,'1875GR
-999:'2:50~ NRAT
-99,9.1:,50 : FCNL
1205.0000
23.8319 ILD _ '--AA19 113~ ILM 20.7349
486.7500 DT fS'b~U 'v GR 486.7500
2.7344 RNRA 2.7676 NPHI 29.8828
817.0000
2.5755 ILD 2.5883 ILM 2.1627
97.4375 07 116.5625. GR 97.4375
4.1836 RNRA 4.4180 NPHI 55.7129
299.7500
Z000.0000 ILD 29.5404 ILM 2000.0000
88.6875 OT 62.6250 GR 88.6875
-999.2500 RNRA -999.2500 NPHI -999.2500
-999.2500
2000.0000 ILD 41.2596 ILM 2000.0000
56.2187 DT 63.0625 GR 56.2187
-999.2500 RNRA -999.2500 NPHI -999.25.00
-9'99.2500
ZO00.O000 ILD 32.7689 ILM 2000.0000
70.0625 07 69.4375 GR 70.0625
-9'99.25'00 RNRA -999.2500 NPHI -999.2500
-999.2500
2000.0'0:00~'~' ILO 32.'5228 I.,LM 2000.000'0
49.2187 OT 5.6=~3.125: GR
--999,2500 RNRA -999'2500 NPHI
-999.2500
2000.0000 ILD ILM 2000.000.0
59.1875 DT GR 59.187'5
RNRA -999.2.500 NPHI -999.2500
8'9'0:0'~'0~?'4"2 .... 'S'FtU 200'0'::;'0~00' It'D 33";:~I8~'''TtM-
-12.1328 GR 67.1250 DT 55.8125 GR
.... 9,99"~:.2,5;0-8 ....... N~-&..~- ..... 9-99~2~,0~ ...... R.N..RA .-99;91~.,2:~-0,~~- NPH[
-999.2500. FCNL -99.9.25.00
SFLU 2000-000:0 iLO 32,127I ILM 2'000,0.000
GR 44,3125 DT 56'- 1875 GR 44.3125
8700.0742 SFLU 2.000.00'00 ILD 28,.'7Q44: ILM ,2000,0000
-999.-,2500 NRAT -99. '2500 RNRA -999.. 2:~,00r PHI -999.2500
-999. 2500 FCNL -99'9. 2500
o
8'8- 9'.~'781':3 un 67.' 1.8:75 DT 6:7.1.875
- 99'9~';' 2'50:0 N"R A'T - 999",~ 2500. .... RNR A - 999- -999.', 2.5:00
-999.2500 FCNL -999.2500
VP OlO.H02 VERIFICATION LISTING PAGE 6
R -999.2500 NRAT
CNL -999.2500 FCNL
EPT 8500.0742 SFLU
P -3.7285 GR
R -999.2500 NRAT
:CNL -999.2500 FCNL
EPT 8400.0742 SFLU
P -12.0547 GR
R -999.2500 NRAT
~:NL -999.2500 FCNL
CNL
8390.5T42 SFLU
-10.6250 GR
-999.2500 NR4T
-999.2500 FCNL
-999.2500 RNRA
-999.2500
2000.0000 ILD
44.4688 DT
-999.2500 RNRA
-999.2500
2000.0000 ILO
94.4375 DT
-999.2500 RNRA
-999.2500
2000.0000 ILD
100.1875 DT
-999.2500 RNRA
-999.2500
-999.2500 NPHI
25.1128 ILM
57.4375 GR
-999.2500 NPHI
38.4621 ILM
56.0625 GR
-999. 2500 NPHI
29.0343 I'LM
56.3750 GR
-999.2500 NPHI
-999.2500
2000.0000
44.4688
-999.2500
2000.0000
94.4375
-999.2500
2000.0000
100.1875
-999.2500
.001
1.024
TAPE TRAILER
R,~¥ICE NAME ', .EOIT
. ,
,TE .86712/29
:
/MK~ i
;OM'MENTS ::LIS T.A.PE~ STANDARD G-Z4~PI 50:,029-'2.1.6:71
,
L NAME "
.72134
~o~.
;OMMENTS :LIS TAPE,
STANDARD :G-Z4,API 50-029-21671
.~,~...~..~ EOF