From:Wallace, Chris D (OGC)
To:AOGCC Records (CED sponsored)
Subject:FW: NOT OPERABLE: PWI MPS-15 (PTD 2012450) Missed 4-year MIT-IA
Date:Tuesday, September 30, 2025 3:17:34 PM
From: Stephen Soroka <steve.soroka@hilcorp.com>
Sent: Tuesday, September 30, 2025 2:08 PM
To: Wallace, Chris D (OGC) <chris.wallace@alaska.gov>
Cc: Regg, James B (OGC) <jim.regg@alaska.gov>; Ryan Thompson <Ryan.Thompson@hilcorp.com>
Subject: NOT OPERABLE: PWI MPS-15 (PTD 2012450) Missed 4-year MIT-IA
Mr. Wallace
PWI MPS-15 (PTD #2012450) is currently shut in and was not brought online for its
scheduled 4-year MIT-IA that was due in September. The well is now classified as NOT
OPERABLE and will remain shut in. A witnessed MIT-IA will be scheduled once the well is
returned to injection.
Please respond with any questions.
Thank You.
Steve Soroka
Hilcorp Alaska LLC
Field Well Integrity
Steve.Soroka@hilcorp.com
P: (907) 830-8976
Alt: Chris Casey
The information contained in this email message is confidential and may be legally privileged and is intended only for the use of theindividual or entity named above. If you are not an intended recipient or if you have received this message in error, you are herebynotified that any dissemination, distribution, or copy of this email is strictly prohibited. If you have received this email in error, please
immediately notify us by return email or telephone if the sender's phone number is listed above, then promptly and permanently delete
this message.
While all reasonable care has been taken to avoid the transmission of viruses, it is the responsibility of the recipient to ensure that theonward transmission, opening, or use of this message and any attachments will not adversely affect its systems or data. No responsibilityis accepted by the company in this regard and the recipient should carry out such virus and other checks as it considers appropriate.
MEMORANDUM
TO: Jim Regg
P.I. Supervisor
FROM: Matt Herrera
Petroleum Inspector
I Well Name MILNE PT UNIT S-15
Insp Num: mitMFH210926081155
Rel Insp Num:
NON -CONFIDENTIAL
State of Alaska
Alaska Oil and Gas Conservation Commission
DATE: Tuesday, September 28, 2021
SUBJECT: Mechanical Integrity Tests
Hilcorp Alaska, LLC
S-15
MILNE PT UNIT S-15
Src: Inspector
Reviewed By.:p
P.I.Supry 19'p
—
Comm
API Well Number 50-029-23061-00-00 Inspector Name: Matt Herrera
Permit Number: 201-245-0 Inspection Date: 9/25/2021 ✓
Packer Depth Pretest Initial 15 Min 30 Min 45 Min 60 Min
Well S-15 - - (Type Inj w -'TVD 4052 Tubing 1153 - 1154 1154 - 1154- ! --
T a ----s-PT^Test
s>lI -----
_ = I_AL1 as 1500---� 1112-t2 -1
-837 lsoo�179
s
BBPumped: 0.4 13131, Returned 0.4 OA 0 0
- 2
Interval 4YRTST P/F �y
_ { --- -
P
Notes: MIT -IA Performed to 1800 PSI Per Operations
Tuesday, September 28, 2021 Page 1 of I
Debra Oudean 80Alaska, LLC
3
GeoTech 38000 Centerpoint Drive, Suite 1400
Anchorage, AK 99503
Tele: 907 777-8337
na,•,,t Ah,.t:,,t.LL E-mail: doudean@hilcorp.com
DATE 10/04/2019
To: Alaska Oil & Gas Conservation Commission
Natural Resource Technician
333 W 7th Ave Ste 100
Anchorage, AK 99501
Halliburton INJECTION PROFILE 20 AUG 2019
CD 1:
L MPU S-15i_IPROF_20AUG19
9'13/20191:55 PM
PDF Documt
MPU S-15i_IPROF 20AUG19_DN40
9!13/20191:56 PM
LAS File
MPU S-15i_IPROF 20AUG19_DN80
9/13/20191:56 PM
LAS File
® MPUS-15i_IPROF 2OAUG19_img
9/13,120191:56 PM
TIFF File
MPU S-15i_[PROF_20AUG19 POOH
9'13120191:56 PM
LAS File
MPUS-15i_IPROF 20AUG19 RIH
9/13.!20191:56 PM
LAS File
MPU_S-15i_IPROF 20AUG19_SS444D
9/13.+20191:56 PM
LAS File
MPU S-15i_IPROF 20AUG19_SS4940
9'13/20191:56 PM
LAS File
MPUS-15i_IPROF_20AUG19SS4480
9,113/20191:56 PM
LAS File
MPUS-15i_IPROF_20AUG19_SS4520
9113120191:56 PM
LAS File
MPU S-15i_[PROF 20AUG19 SS4560
9/13/20191:5613M
LAS File
MPU S -15i IPROF 20AUG19_UP40
9173,,120191:56 PM
LAS File
MPU S-15i_[PROF _ZOAUG19_UP80
9'13/2D191:56 P14
LAS File
MPU S-15i_IPROF_28AUG19_UP120
9/13✓20191:56 PM
LAS File
Please include current contact information if different from above.
261245
31299
Please acknowledge receipt by siping and returning one copy of this transmittal or FAX to 907 777.8337
Received By: JAI � , / //n,, / /I I Date:
• •
MEMORANDUM State of Alaska
Alaska Oil and Gas Conservation Commission
TO: DATE: Thursday,September 21,2017
Jim Regg
P.I.Supervisor ` S a
((7 SUBJECT: Mechanical Integrity Tests
HILCORP ALASKA LLC
S-15
FROM: Chuck Scheve MILNE PT UNIT S-15
Petroleum Inspector
Src: Inspector
Reviewed By:
P.I.Supry �J Dpi
NON-CONFIDENTIAL Comm
Well Name MILNE PT UNIT S-15 API Well Number 50-029-23061-00-00 Inspector Name: Chuck Scheve
Permit Number: 201-245-0 Inspection Date: 9/18/2017
Insp Num: mitCS170918142725
Rel Insp Num:
Packer Depth Pretest Initial 15 Min 30 Min 45 Min 60 Min
Well S-15 " Type Inj W' TVD 4052 Tubing 1173 1173 - 1173 - 1173 -
PTD 2012450 Type Test SPT Test psi 1500 - IA 505 2104 - 2025 - 2021 -
BBL Pumped_ I BBL Returned_ 0.8 OA ' --_8— 8 7 7
Interval 4YRTST p/F P
Notes:
SCANNED FEB 2018
Thursday,September 21,2017 Page 1 of 1
Imagl -- roject Well History File Cover ~~e
XHVZE
This page identifies those items that were not scanned during the initial production scanning
phase. They are available in the original file, may be scanned during a special rescan activity or
are viewable by direct inspection of the file.
7J;--
PAGE COUNT MATCHES NUMBER IN SCANNING PREPARATION: ~ - NO
DA TE;! if () lj-/SI vY\ P
IF NO IN STAGE 1, PAGE(S) DISCREPANCIES WERE FOUND: I - YES - NO
(1 Q J- - Q..1..þ? Well History File Identifier
Organizing I"nl' ~
RESCAN
0 Two-Sided
D~ITAL DATA
\£ Diskettes, No. ~
0
Color items:
0
Grayscale items:
Other. NofType
0
0
Poor Quality Originals:
0
Other:
NOTES:
BY.
BEVERLY ROBIN VINCENT SHER'((~~WIND~'
Project Proofing
BY.
BEVERLY ROBrr~ VINCENT SHERY~IND'(
Scanning Preparation
~
X30=&n
BY
BEVERLY ROBIN VINCENT SHERY~IND (
Production Scanning
Stage 1
PAGE COUNT FROM SCANNED FILE:
BY:
BEVERLY ROBIN VrrJCENT SHERYL~IND'(
Stage 2
B (:
BEVERL'( ROBlfJ VINCENT SHER'(L MARIA WIND'(
(SCAWMI(\ IS COI.IPlE1E Ar IHIS 1'01111 UPllESS SPEC'''l A IIEIIIIO/ IS REQUIRED Ol AlII/IDIVlDUAL PAGE BASIS
DUE 10 QUAlIlY, GRMSCAlE OR COLOR IMAGES)
ReScanned I/llIf' r,;',. ,/ /,'1/ . I -'I''''' 1,11,'1/, ":/'1'1/ '.1,,1'1"'//:" I,''''II'I',I!,,','' Ii}
RESCANr~ED B.(: BEVERLY ROBIN VINCENT SHERYL MARIA WINDY
General Noles or Comments about Ihis file:
0 Rescan Needed
OVERSIZED (Scannable)
0
Maps:
0
Other items scannable by
large scanner
OVERSIZED (Non-Scannable)
0
Logs of various kinds
Other
V11,j
0
DATEftJ I/ÓIf 151
DA.TE:~" i t'Lf Isl
VI1~
+ / ,~r;
= TOTAL PAGES 7,Ç
r11!J
DA1E./J , O~ Is!
DATE:
1st
DATE:
/s/
Quality Checked '''''"''¡
.................- .....-........
• •
MEMORANDUM State of Alaska
Alaska Oil and Gas Conservation Commission
DATE: Monday,September 23,2013
TO: Jim Regg "pt,4 01/3ó143
P.I.Supervisor 1 ( SUBJECT: Mechanical Integrity Tests
BP EXPLORATION(ALASKA)INC
S-15
FROM: John Crisp MILNE PT UNIT SB S-15
Petroleum Inspector
Src: Inspector
Reviewed By:
P.I.Supry j fie--
NON-CONFIDENTIAL Comm
Well Name MILNE PT UNIT SB S-15 API Well Number 50-029-23061-00-00 Inspector Name: John Crisp
Permit Number: 201-245-0
Inspection Date: 9/18/2013
Insp Num: mitJCr130923092852
Rel Insp Num:
Packer Depth Pretest Initial 15 Min 30 Min 45 Min 60 Min
T
Weill S-15 TIType Inj r w 21TVD 1 4052 I IA 1 58 1 2770 2668 - 2661 - 1
1--- 1
1 1
PTDdi 2012450 ' LType Test r SPT 1Test psi 15°° 'I OA 1 12 , 13 , 13 13 . 1
7 I A
Interval i4YRTST . P/F 1 P ' Tubing 680 . 680 • 680 680
1 ._,
Notes: 1.4 bbls pumped for test.
%WED n TZ ri
Monday,September 23,2013 Page 1 of 1
•
bp
BP Exploration (Alaska) Inc.
Attn: Well Integrity Coordinator, PRB -20
Post Office Box 196612
Anchorage, Alaska 99519 -6612
AiqNED FEB 2 4 2012
December 30, 2011
Mr. Tom Maunder
Alaska Oil and Gas Conservation Commission
333 West 7 Avenue
Anchorage, Alaska 99501 PS i 5
Subject: Corrosion Inhibitor Treatments of MPS -Pad
Dear Mr. Maunder,
Enclosed please find multiple copies of a spreadsheet with a list of wells from MPS -Pad
that were treated with corrosion inhibitor in the surface casing by conductor annulus.
The corrosion inhibitor is engineered to prevent water from entering the annular space
and causing external corrosion that could result in a surface casing leak to atmosphere.
The attached spreadsheet represents the well name, API and PTD numbers, top of
cement depth prior to filling and volumes of corrosion inhibitor used in each conductor.
As per previous agreement with the AOGCC, this letter and spreadsheet serve as
notification that the treatments took place and meet the requirements of form 10 -404,
Report of Sundry Operations.
If you require any additional information, please contact me or my alternate, Gerald
Murphy, at 659 -5102.
Sincerely, ri )
Mehreen Vazir
BPXA, Well Integrity Coordinator
. •
,
1
1
BP Exploration (Alaska) Inc.
Surface Casing by Conductor Annulus Cement, Corrosion inhibitor, Sealant Top-off
Report of Sundry Operations (10 -404)
MPS -Pad
10/11/2011
Corrosion
• Vol. of cement Final top of Cement top off Corrosion inhibitor/
Well Name PTD # API # Initial top of cement pumped cement date inhibitor sealant date
ft bbls ft gal
MPS-01A 2070340 50029231410100 0.25 NA 0.25 NA 5.1 9/6/2011
MPS-02 2031270 50029231690000 2.5 NA 2.5 NA 23.8 7/30/2011
MPS-03 2021460 50029231050000 Open Flutes - Treated
MPS-04 2030520 50029231480000 1.7 NA 1.7 NA 17.0 7/30/2011
MPS -05 2021370 50029231000000 Open Flutes - Treated
MPS-06 2031090 50029231630000 1.7 NA 1.7 NA 17.0 7/30/2011
MPS-07 2020720 50029230790000 1 NA 1 NA 13.6 11/3/2009
MPS-08 2031230 50029231680000 1.3 NA 1.3 NA 10.2 7/30/2011
MPS-09 2020200 50029230670000 0.5 NA 0.5 NA 5.1 11/32009
MPS -10A 2051250 50029231520100 1.3 NA 1.3 NA 11.9 7/29/2011
MPS-11 2021130 50029230920000 1 NA 1 NA 10.2 7/29/2011
MPS-12 2030230 50029231390000 0.6 NA 0.6 NA 6.8 7/29/2011
MPS -13 2021240 50029230930000 1 NA 1 NA 11.9 11/3/2009
MPS -14 2031040 50029231620000 1.8 NA 1.8 NA 22.1 7/29/2011
`'� MPS-15 2012450 50029230610000 9.6 NA 9.6 NA 88.4 7/31/2011
MPS -16 2030650 50029231510000 1.2 NA 1.2 NA 10.2 7/29/2011
MPS -17 2021730 50029231150000 Open Flutes - Treated
MPS-18 2022420 50029231330000 1.3 NA 1.3 NA 11.9 7/29/2011
MPS -19A 2022330 50029231210100 1.8 NA 1.8 NA 23.8 7/29/2011
MPS-20 2022410 50029231320000 1.3 NA 1.3 NA 11.9 7/29/2011
MPS-21 2020090 50029230650000 1.8 NA 1.8 NA 22.1 11/3/2009
MPS-22 2031470 50029231760000 9.1 NA 9.1 NA 83.3 728/2011
MPS-23 2021320 50029230980000 Open Flutes - Treated
MPS-24 2030380 50029231420000 1.3 NA 1.3 NA 10.2 7/28/2011
MPS -25 2021030 50029230890000 Open Flutes - Treated
MPS -26 2030610 50029231500000 1 NA 1 NA 8.5 7/28/2011
MPS-27 2020850 50029230840000 0.9 NA 0.9 NA 8.5 7/28/2011
MPS -28 2030940 50029231580000 1.1 NA 1.1 NA 11.9 7282011
MPS -29 2021950 50029231190000 Open Flutes - Treated
MPS-30 2022360 50029231310000 1.2 NA 1.2 NA 11.9 7/28/2011
MPS -31 2020140 50029230660000 Open Flutes - Treated
MPS-32 2030920 50029231570000 0.8 NA 0.8 NA 6.8 7282011
MPS -33A 2061720 50029231230100 1 NA 1 NA 6.8 7/28/2011
MPS-34 2031300 50029231710000 6 NA 6 NA 49.3 7/28/2011
MPS-35 2031430 50029231750000 1.2 NA 1.2 NA 11.9 7/28/2011
MPS -37 2070520 50029233550000 13.9 Need top job NA
MPS-39 2081830 50029234050000 0.7 NA 0.7 NA 4.3 8/18/2011
MPS -41A 2081610 50029234010100 Sealed NA NA NA NA NA
MPS-43 2081760 50029234040000 Dust Cover NA NA NA 6.8 10/11/2011
MPS -90 2051350 50029232760000 0.6 NA 0.6 NA 3.4 9/6/2011
MPSB -04 500299990799 0.6 NA 0.6 NA 3.4 7/30/2011
.
.
MICROFILMED
07/25/06
DO NOT PLACE
ANY NEW MATERIAL
UNDER THIS PAGE
F:\LaserFicbe\CvrPgs _Inserts\Microfilm _ Marker. doc
~ g t/ltt-) ~.. \..> í) U
DATA SUBMITTAL COMPLIANCE REPORT
4/29/2004
"-.
~,/L
À ^ J w"'- )'Ù (: .;.
Permit to Drill 2012450
Well Name/No. MILNE PT UNIT SB S-15
Operator BP EXPLORATION (ALASKA) INC
MD
4797 --
TVD 4585--
Completion Date 4/28/2002'--
Completion Status 1 WINJ
Current Status 1WINJ
API No. 50-029-23061-00-00
<:0¿'~'') --
---------
--------- -------- - ------ -
--. --- -- ----
- -- - - --- ------ --
--- --------------- ----
- --- -- --- ---- -- - -
---- ---
--. -------
REQUIRED INFORMATION
- --- - - ----- --------- -------- -------
------- - ---
------ Directional Survey "~ 'Y ~:~
Mud Log No
Samples No
----------- --------------
---------
DATA INFORMATION
Types Electric or Other Logs Run:
Well Log Information:
RES/AIT, DT/BHC, CNL. LDL, GR. Caliper, SP, MRES, DEN, NEU, D
(data taken from Logs Portion of Master Well Data Maint)
Log/ Electr
Data Digital Dataset Log Log Run Interval OH/
Type Med/Fnnt Number Name Scale Media No Start Stop CH Received Comments
[EO--- - ---- --- --- ---- --
D 10670 LIS Verification 1 76 4734 Open 4/4/2002
(..Rpt 10670 LIS Verification 76 4734 Open 4/4/2002
LiD C 10622 Sonic 1,2 100 4802 Open 3/5/2002
GeD C 10968 See Notes 1 113 4794 Open 7/10/2002 Digital Log Images
---- ---_ !
-- --------
Well Cores/Samples Infonnation:
Cuttings
Interval
Start Stop
110 4758
Sent
Received
Sample
Set
Number Comments
1 055 ...-;..-~
Î
I
- __I
Name
--------------
---------
-------- -----
--- - ---- --- --
Well Cored?
ADDITIONAL INFORMATION
G)N
ç \....,~- L
~ ~.... t,./
Daily History Received?
ci)N
...
~/N
Chips Received? --¥-+-N--
Formation Tops
Analysis
Received?
(bN
----- --
------ -_.---
- ---.---------------
-------
Comments:
~om~ij~~~e ;e:i::e~ ~y~~- ~lJ ~~-----~- - ~-- -
- --- -----
--- ------
--------
Date:
_2_ll~~- ÀlJ~_:;¡
MECHANICJ~ INTEGRITY P~PORT
'......
Cë.si~g:
'\
_:.:¡e:- : ~} t\ Shoe:
:'.Joi:-".g: ~\(;;, Packe::- \...\dto~ till
~ole S~ze 1's\Id- ê.nå Nt\-
l/;xra-;;>-ÇJ OPER & FIELD .~V v\,\\\c ?O\"\-
4{~~~~~ - ¡.¡ELL NUMBER \J\y S - \ ç \.ï:XJ\-d-Lt5)
TD: ,--\~\,HJ), ~S<65 TVD; ?3TD: ~\\) ~ H1? "-\'-\~ \ TV})
Shoe: 4.'ì.)r<6tm TVD i DV: ~~ l1D tJ~ '.'IVTI
:: ? U D D -~- ::::: : :
:~ ~ G [\ E :.., .:: ;..:: ~: .
.~!:.LL DAT.?-
MD
TVD¡ :CF:
HD
: ",,-D
Perf;:;
"'S~~
~S ~ <p
~~C)~
L-\.5 ~ 3>
to
TVD i See ê. L:
~5" ~
~Cr.ÞJ~:C;'..L l:NTEGRITr - ?.A..RT f I
Þ_nnü.ltls ?ress Test: ::? 'J5r'lj I 15 U1in2>~dS i 30 min c)'-\).S-.
Co=ents: ~ \ T 'Ñ'\h,e,:>s~ ~l <:"'''-..)(')~~~~W: ,",(yO ~
~
:ŒCRÞ..NIC¡'~ INTEGRITY - PART 42
~ 4\<0 \:>'a\~ ",
\ ~Q c:...\ ,L..J\~ ~c;;..)
C e!l1en t: Volumes :"" Þ..mt. Line.r ~ ~ i Cs g ; DV 'N C\ .
CwC -JO 1 to cove~ perf S dd- b~ \ ~ <:....~ f'l'C.C'\.-\- ~\. ~\<3.e.~ \- ~ c1)\JC\"
?rc.v\'S f(\'-J":> '500'
"i:heorecical TOe CJ:~~~-\-Ò,t..~\o..~~ \0 ;';"~"~C'1ë
CemeTI.t Bond Log (Yes or No) '{Q'.~ ; ~n AOGCC File 'i.<ë"
CEL =:vc.luation, ;:.one ;;'Dove perfs ("=>/ro-O"), ') ~"", ,",-\at ~
<:A~ \t--~~\ss~~ ~\-~:cl \k\'(\\\.~\~e~~
Proàuc.tion Log:
TY1Je
i Evale.õ.tion
CONCLUSIONS:
? art: n: t-\ r "\s C0<i: ""Of'-.> '""^ \ftCJ.
M¡: \:~ \~(f.'w*m:ïJY1 \ '{J.¡;'6-O~
? ë.r :: : z :
MEMORANDUM
State of Alaska
Alaska Oil and Gas Conservation Commission
TO: Randy Ruedrich ~
Commissioner
/' (j I.: ~\Î.J~ SUBJECT: Mechanical Integrity Test
THRU: Tom Maunder /)~~\~~ BPX
P.I. Supervisor MPU S Pad
DATE: April 7 2003
FROM: Chuck Scheve
Petroleum Inspector
NON. CONFIDENTIAL
Well 5-15 Type Inj. 5
P.T.D, 201-245 Type test P
Notes:
Well 5-30 Type Inj. 5
P.TD, 202-236 Type test P
Notes:
Well Type Inj,
P.TD. Type test
Notes:
Well Type Inj,
P.TD, Type test
Notes:
Well Type Inj,
P.TD, Type test
Notes:
Type INJ, Fluid Codes
F = FRESH WATER INJ,
G = GAS INJ,
S = SALT WATER INJ,
N = NOT INJECTING
Packer Deplh Pretest Initial 15 Min. 30 Min,
T,V.D, 4053 Tubing 1425 1425 1425 1425 Interval I
Test psi 1013 Casing 1150 2500 2425 2425 P/F f
T.V.D. 4060 Tubing 1450 1450
Tesl psi 1015 Casing 550 2500
TV.D. Tubing
Test psi Casing
T,V.D, Tubing
Test psi Casing
T.V.D. Tubing
Test psi Casing
Type Test
M= Annulus Monitoring
P= Standard Pressure Test
R= Internal Radioactive Tracer Survey
A= Temperature Anomaly Survey
D= Differential Temperature Test
"/'
1450 1450 Interval I
2400 2400 P/F f
Interval
P/F
Interval
P/F
Interval
P/F
....'
Interval
1= Initial Test
4= Four Year Cycle
V= Required by Variance
W= Test during Workover
0= Other (describe in notes)
Test's Details
I traveled to BPXs MPU 5 Pad and witnessed the initial MlI on wells 5-15 and 5-30,
pressures were observed and found to be stable. The pressure tests were then perfonned
demonstrating good mechanical integrity.
M.I.T.'s performed: ~
Attachments:
MIT report form
5/12/00 L.G.
Number of Failures: .Q
The pretest tubing and casing
for 30 minutes with both wells
Total Time during tests: 2 hours
cc:
MIT MPU S Pad 4-7-03 CS.xls
4/18/2003
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
WELL COMPLETION OR RECOMPLETION REPORT AND LOG
Revised 02/18/03, Start Injection
23.
CASING
SIZE
20"
1. Status of Well
0 Oil 0 Gas 0 Suspended 0 Abandoned 181 Service
2. Name of Operator
BP Exploration (Alaska) Inc.
3. Address
P.O. Box 196612, Anchorage, Alaska 99519-6612
4. Location of well at surface
3323' NSL, 136' WEL, SEC. 12, T12N, R10E, UM
At top of productive interval
4294' NSL, 201' WEL, SEC. 12, T12N, R10E, UM X = 565801, Y = 6000962 10. Well Number
At total depth
4302' NSL, 196' WEL, SEC. 12, T12N, R10E, UM X = 565805, Y = 6000970
11. Field and Pool
5. Elevation in feet (indicate KB, OF, etc.) 6. Lease Designation and Serial No. Milne Point Unit / Schrader Bluff
KBE = 73.20' ADL380109
12. Date Spudded 13. Date T.D. Reached 14. Date Comp., Susp., or Aband.
1/22/2002 1/27/2002 4/28/2002
17. Total Depth (MD+TVD) 18. Plug Back Depth (MD+TVD) 19. DirectionaLSurvey
4797 4585 FT 4703 4491 FT \k. .EL Yes R'No
22. Type Electric or Other Logs Run
RES / AIT, DT / BHC, CNL, LDL, GR, Caliper, SP, MRES, DEN, NEU, DSI
CASING, liNER AND CEMENTING RECORD
SETTING DEPTH HOLE
Top BOTTOM SIZE
35' 112' 42"
35' 2499' 12-1/4"
32' 4788' 8-1/2"
~~!;..~.:.
," . r.
,~ ~'JZl> ~
~,.....~;I~J :¡
,-.. ¡ , ,. .-
r:- ~';~.'_.. - ':': "
Classification of Service Well
Water Injection
7. Permit Number
201-245 302-132
8. API Number
50- 029-23061-00
9. Unit or Lease Name
Milne Point Unit
X = 565875, Y = 5999991
MPS;t5i .s - \ 5"
15. Water depth, if offshore 16. No. of Completions
Nt A MSL One
20. Depth where SSSV set 21. Thickness of Permafrost
N/A MD 1800' (Approx.)
9-5/8"
WT. PER FT.
92#
40#
26#
GRADE
H-40
L-80
L-80
CEMENTING RECORD
260 sx Arctic Set (Approx.)
501 sx Class 'L', 225 sx Class 'G'
249 sx Arctic Set I, 225 sx Class 'G'
AMOUNT PULLED
7"
24. Perforations open to Production (MD+ TVD of Top and
Bottom and interval, size and number)
2-1/2" Gun Diameter, 4 SPF
MD TVD
SIZE
3-1/2", 9.3#, L-80
TUBING RECORD
DEPTH SET (MD)
4303'
PACKER SET (MD)
4264'
25.
MD
TVD
4523' - 4543'
4576' - 4596'
4311' - 4331'
4364' -4384'
26.
ACID, FRACTURE, CEMENT SQUEEZE, ETC.
DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED
Freeze Protected with 75 Bbls of Diesel.
27.
Date First Production
January 19, 2003
Date of Test Hours Tested
PRODUCTION TEST
Method of Operation (Flowing, gas lift, etc.)
Water Injection
PRODUCTION FOR OIL-BBL
TEST PERIOD
GAs-McF
WATER-BBL
CHOKE SIZE
GAS-OIL RATIO
Flow Tubing Casing Pressure CALCULATED
Press. 24-HoUR RATE
OIL-BBL
GAs-McF
WATER-BBL
OIL GRAVITY-API (CORR)
28,
CORE DATA
Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips.
See Attached.
- ....."
I \-
~
Form 10-407 Rev. 07-01-80
-'~"S 8Fl
C¡:I:
I 1.1,' - I
Submit In Duplicate
29.
Geologic Markers
30.
Formation Tests
Marker Name
Measured
Depth
True Vertical
Depth
Include interval tested, pressure data, all fluids recovered and
gravity, GOR, and time of each phase.
Top of Schrader Bluff OA
4519'
4307'
Top of Schrader Bluff C
4547'
4335'
Top of Schrader Bluff OB
4574'
4362'
31. List of Attachments:
32. I hereby certify that the ~going is true ~d correct to the best of my knowledge
Signed son~é--:~:k Title Technical Assistant Date Oé3--[ ß ()S
M PS-15i 201-245 302-132 Prepared By Name/Number: Sandra Stewman, 564-4750
Well Number Permit No. / Approval No. Drilling Engineer: Steve Campbell, 564-4401
INSTRUCTIONS
GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska.
ITEM 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection. salt water disposal. water supply for injection, observation.
injection for in-situ combustion.
ITEM 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any
attachments,
ITEM 16 AND 24: If this well is completed for separate production from more than one interval (multiple completion). so state in item 16, and in item 24 show the
producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced. showing the data
pertinent to such interval.
ITEM 21: Indicate whether from ground level (GL) or other elevation (OF. KB. etc.).
ITEM 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool.
ITEM 27: Method of Operation: Flowing. Gas Lift, Rod Pump. Hydraulic Pump. Submersible. Water Injection. Gas Injection, Shut-In, Other-explain.
ITEM 28: If no cores taken, indicate 'none',
Form 10-407 Rev. 07-01-80
Ò,OI-ë;A L/ S
IOCJfofS
'''ELL LOG TRt\NSMITTAL
To:
State of Alaska
Alaska Oil and Gas Conservation Comm.
Attn.: Lisa Weepie
333 West 7th Avenue, Suite 100
Anchorage, Alaska 99501
July 08, 2002
RE:
MWD Formation Evaluation Logs - MPS-15,
AK-Ml\1-220 15
l\IPS-15:
Digital Log Images:
50-029-2306] -00
1 CD Rom
PLEASE ACKNOWLEDGE RECEIPT BY SIGNrNG AND RETURNING THE ATTACHED COPIES
OF THE TRANSMITTAL LETTER TO THE ATTENTION OF:
Spell)'-Sun Drilling Services
Ann: Rob Kalish
6900 Arctic Bh'd.
Anchorage, Alaska 995 I 8
BP Exploration (Alaska) Jnc,
Petro-technical Data Center LR2-]
900 E, Benson Blvd,
Anchorage, Alaska 99508
Date:
Sign&-~
RECE\VED
JUL 1 ~~ Z002
Al ska Oil & Gas Cons. Comnuss\oo
a And\orage
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
WELL COMPLETION OR RECOMPLETION REPORT AND LOG
1. Status of Well
0 Oil 0 Gas 0 Suspended 0 Abandoned 181 Service
2. Name of Operator
BP Exploration (Alaska) Inc.
3. Address
P.O. Box 196612, Anchorage, Alaska 99519-6612
4. Location of well at surface
3323' NSL, 136' WEL, SEC. 12. T12N, R10E, UM , '-'..~
At top of productive interval " ~)! ~'..: .
4294' NSL, 201' WEL, SEC. 12, T12N, R10E, UM . .7f-2i/~ 10. Well Number
At total depth ~" , '" ,-,' '
4302' NSL, 196' WEL, SEC. 12, T12N, R10E, UM ..." - L".~,
. 11. Field and Pool
5. Elevation in feet (indicate KB, OF, etc.) 6. Lease Designation and Serial Nò~ ' Milne Point Unit 1 Schrader Bluff
KBE = 73.20' ADL380109
12. Date Spudded 13. Date T.D. Reached 14. Date Comp., Susp., or Aband.
1/22/2002 1/27/2002 4/28/2002
17. Total Depth (MD+TVD) 18. Plug Back Depth (MD+TVD) 19. Directional Survey
4797 4585 FT 4703 4491 FT Ia Yes 0 No
22. Type Electric or Other Logs Run
RES 1 AIT, DT 1 BHC, CNL, LDL, GR,
Classification of Service Well
Water Injection
7. Permit Number
201-245 302-132
8. API Number
50- 029-23061-00
. Unit or Lease Name
Milne Point Unit
MPS-15i
15. Water depth, if offshore 16. No. of Completions
NI A MSL One
20. Depth where SSSV set 21. Thickness of Permafrost
NIA MD 1800' (Approx.)
23.
CASING
SIZE
20"
9-5/8"
7"
WT. PER FT.
92#
40#
26#
GRADE
H-40
L-80
L-80
Caliper, SP, MRES, DEN, NEU, DSI
CASING, LINER AND CEMENTING RECORD
SETTING DEPTH HOLE
Top BOTTOM SIZE CEMENTING RECORD
35' 112' 42" 260 sx Arctic Set (Approx.)
35' 2499' 12-1/4" 501 sx Class 'L', 225 sx Class 'G'
32' 4788' 8-1/2" ,249 sx Arctic Set I, 225 sx Class 'G'
AMOUNT PULLED
24. Perforations open to Production (MD+ TVD of Top and
Bottom and interval, size and number)
2-1/2" Gun Diameter, 4 SPF
MD TVD
SIZE
3-1/2", 9.3#, L-80
TUBING RECORD
DEPTH SET (MD)
4303'
PACKER SET (MD)
4264'
25.
MD
TVD
4523' - 4543'
4576' - 4596'
4311' - 4331'
4364' -4384'
26.
ACID, FRACTURE, CEMENT SQUEEZE, ETC.
DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED
Freeze Protected with 75 Bbls of Diesel.
27.
Date First Production
Not on Injection
Date of Test Hours Tested
PRODUCTION TEST
Method of Operation (Flowing, gas lift, etc.)
NIA
PRODUCTION FOR OIL-BBL
TEST PERIOD
GAs-McF
WATER-BBL
CHOKE SIZE
GAS-OIL RATIO
Flow Tubing Casing Pressure CALCULATED
Press. 24-HoUR RATE
28. CORE DATA ,~-- :.~ ;..'. :'~ ' ',; C ~-~,
." .', ,'~. .
Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or 'water: 'Submit'core chips.
OIL-BBL
GAs-McF
WATER-BBL
OIL GRAVITY-API (CORR)
See Attached.
.l:,!:).~~'~~l t;:, -. ~-\, ." I \,. -.,' :L:~I I~:"~U!
. ,4n'::lùr':t:'8
Form 10-407 Rev. 07-01-80
(" '\ ,.", ,
J ,1/ J'¡
V,I
d ~
(~, ;; -;., j ,~~:\ ~
',--,,'i~. ~L-
R B D M S B F L Mt ç f: .?;~~bmit In Duplicate
29.
Geologic Markers
30.
Formation Tests
Marker Name
Measured
Depth
True Vertical
Depth
Include interval tested, pressure data, all fluids recovered
and gravity, GOR, and time of each phase.
Top of Schrader Bluff OA
4519'
4307'
Top of Schrader Bluff C
4547'
4335'
Top of Schrader Bluff OB
4574'
4362'
,J 'I
, '
':. ,\
- . r : . ~
..' \. .-
." " '. . ;, ~ I ... I ...:. ~ , .~ ~
,;'.'.l;1t.::r:,.,. ;;~".: ~.: L- [,I ';:,~,';.'~, ',. \:
31, List of Attachments:
Summary of Daily Drilling Reports, Surveys, Leak-Off Test Summary, Post Rig Work Summary and a
Core Analysis Results.
32. I ~erebY certify that the fo~oin~ is true and correct to the best of my knowledge
Signed Terne Hubble ~Q ÂA.l..ß ~ ~ Title Technical Assistant
MPS-15i 201-245 302-132
Well Number Permit No. I Approval No.
Sidewall
Date
0 $- ~ :<.: O~
Prepared By Name/Number: Sandra Stewman. 564-4750
INSTRUCTIONS
GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska,
ITEM 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection. observation,
injection for in-situ combustion.
ITEM 5: Indicate which elevation IS used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any
attachments.
ITEM 16 AND 24: If this well is completed for separate production from more than one interval (multiple completion). so state in item 16, and in item 24 show the
producing intervals for only the interval reported in item 27, Submit a separate form for each additional interval to be separately produced. showing the data
pertinent to such interval.
ITEM 21: Indicate whether from ground level (GL) or other elevation (DF. KB, etc.).
ITEM 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool.
ITEM 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, Other-explain.
ITEM 28: If no cores taken, indicate 'none'.
Form 10-407 Rev. 07-01-80
~-~, BP Alaska File No. : 57111-02020
-.!\ MPS-15i
[ore Lab Milne Point Field
Sidewall Core Analysis Results
Sample Depth Perm. Porosity Saturations Grain Description Method
No. Kair Oil I Water I Total I O/w Density
ft md 0.' 0, O' 0 Ratio glee
'0 .0 ,'0 .0
4172 fg-mg ss some heavy oil (Iar)
4229 fg-mg ss no smell
4289 fg-mg ss no smell
4297 fg-mg ss no smell
4306 fg-mg ss no smell
4321 ss slty fg
4327 clyst sli slty
4403 good ss fg-mg no oil smell
4405 190, 30,8 32.9 64.5 97.4 0,51 2,64 Sd brn vf-Igr slty dk stn gld flu OS
4407 good ss fg-mg no oil smell
2 4409 264. 31.1 28.4 67,0 95.4 0.42 2,63 Sd brn vf-fgr sslty dk sIn gld flu OS
4411 good ss fg-mg no oil smell
4433 fg ss no oil smell
4447 fg ss no oil smell
4449 slty vfg ss argil
4519 ss fg better quality wI oil slaining
4521 slty vfg ss
4523 slty vfg ss
3 4525 3.57 26,3 29.4 66,3 95,7 0.44 2,69 Sd tan vfgr vslty cly m stn gld flu OS
4527 slty vfg ss
4529 vfg-Ig ss oil slained nice sand
4 4531 7.55 28,1 19.6 77.4 97.0 0.25 2,83 Slllllan-gry vfgr sdy lam vcly m slrk stn gld flu OS
4533 argil sltsllo slty clyst
4535 slty ss argil
5 4537 9.45 30.1 35.5 64.1 99.6 0,55 2.73 Sd brn vfgr slty scly dk sIn gld flu OS
4539 argil sltsl to vfg ss
4541 argil sltsl to vfg ss
4543 argil sllsl
4545 slty clysl
6 4575 30,8 31.5 30.7 66,9 97.6 0.46 2,66 Sd brn vfgr slty scly dk stn gld flu OS
4577 argil sltst
'\ BP Alaska File No. : 57111-02020
MPS-15i
"":..' Milne Point Field
ÚJre Lab
Sidewall Core Analysis Results
Sample Depth Perm. Porosity Saturations Grain Description Method
No. Kair Oil I Water I Total I OIW Density
ft md 01 O' O' 01 Ratio glee
,0 10 '0 .0
7 4579 5.58 29.0 21.7 77.8 99,5 0,28 2.70 Sd brn vgfr vslty cly m stn dgld lIu OS
4580 argil sltst to vfg ss
8 4582 2.24 27.3 13,3 85.6 98.9 0.16 2.67 Sd brn vgfr vslty cly m stn dgld lIu OS
4584 argil sltst -
9 4586 4.98 30,3 16.6 83,2 99,8 0.20 2,69 Sd It brn vfgr vslty cly m stn dgld flu OS
4588 slty clyst
10 4590 0.969 26,2 12,0 78.7 90.7 0.15 2.72 Sh It lan-gry vslty It sptd stn dgld flu OS
4592 vfg ss to sltst argil
11 4594 1.43 26.5 17,5 74,3 91.8 0.24 2,73 Sltst tan scly m stn dgld flu DS
4596 MO slty clyst
12 4598 3.80 27,2 18,8 77,0 95,8 0,24 2,68 SlIst tan-gry vfgr sdy cly m strk stn dgld flu OS
4600 MO slty clyst
4667 MO slty clyst
4669 MO slty clyst
Legal Name: MPS-15
Common Name: MPS-15
Test Date
1/25/2002
1/26/2002
0
FIT
Test Type
Test Depth (TMD)
(ft)
2,534.0 (ft)
BP EXPLORATION
Leak-Off Test Summary
Test Depth (TVD)
(ft)
2.479.0 (ft)
AMW
(ppg)
8.60 (ppg)
Surface Pressure
(psi)
500 (psi)
Leak Off Pressure (BHP)
(psi)
1,608 (psi)
Page 1 of 1
EMW
12.48 (ppg)
12.48 (ppg)
PrInted 2/4/2002 10 32 11 AM
BP EXPLORATION Page 1 of 5
Operations Summary Report
Legal Well Name: MPS-15
Common Well Name: MPS-15 Spud Date: 1/22/2002
Event Name: DRILL +COMPLETE Start: 12/28/2001 End: 1/29/2002
Contractor Name: NABORS Rig Release: 1/29/2002
Rig Name: NABORS 27ES Rig Number: 27E
Date From - To Hours Activity Code NPT Phase Description of Operations
1 118/2002 00:00 - 03:30 3,50 MOB P PRE BLOW DOWN - PICK UP AND CLEAN UP CELLAR - PREP
RIG FLOOR FOR MOVE
03,30 - 09:00 5.50 MOB P PRE MOVE OUT PUMP, PIT, MOTOR. PIPE SHED COMPLEX -
OPEN UP CELLAR DOORS
09:00 - 14:00 5.00 MOB P PRE MOVE SUB OFF WELL MPF-90 - LINE UP FOR MOVING -
MOVE TIRES IN - ATTACH TONGUE STIFF ARMS - LOAD
DRLG LINE SPOOL ONTO TRUCK
14:00 - 0,00 MOB P PRE MOVE PITS, MOTOR COMPLEX - SUB BASE TO Y @ MILNE
POINT - CHECK ON WEATHER CONDITIONS - 30MPH
WIND - +50 BELOW CHILL FACTOR - DRIFTING SNOW -
I PHASE 2 IN GPB I KUPARUK - PHASE 1 MILNE PT - S PAD
i FILLED WITH DRIFTING SNOW HIGH WINDS CAN NOT
I LAY HERULlTE FOR RIG
1/19/2002 100:00 - 01 :30 1.50 MOB P PRE LEFT SUB MODULE AT MILNE PT "Y" BECAUSE OF THE
WEATHER CONDITIONS AT THE TURN ON S-PAD - POOR
VISIBIL TY, DRIFTING SNOW. HIGH WINDS - CON'T
MOVING PUMP ROOM MODULE FROM THE "Y" TO S-PAD
01 :30 - 03:00 1.50 MOB P PRE RETURN TO F-PAD - RIG UP PIPE SHED SECTIONS FOR
TRANSPORT TO S-PAD
03:00 - 05:00 2.00 MOB P PRE MOVE PIPE SHED'S FROM F-PAD TO S-PAD
05:00 - 10:00 5.00 MOB P PRE LAY COMPOSITE MATS OVER PIPE LINE ENTERING
S-PAD ROAD - PREPARE TO MOVE SUB MODULE -
WAITED ON WEATHER DUE TO HIGH WINDS POOR
VISIBILITY
110:00 - 15:30 5.50 MOB P PRE MOVE SUB MODULE FROM "Y" TO TURN OFF TO S-PAD
ROAD - CON'T MOVE SUB AROUND TURN AND DOWN
ROAD TO S-PAD LOCATION - EDGE OF S-PAD ROAD
VERY NARROW AND SOFT - AS RIG MADE TURN ONTO
S-PAD ROAD SHOULDER ON APPROACH WAS SOFT AND
STARTED TO SLIDE
15:30-18:00 2 50 MOB P PRE TAKE DRLG LINE SPOOL OFF TRUCK - REMOVE TONGUE
- SPREAD TIRES
18:00 - 21 :00 3.00 MOB P PRE SPREAD HERCULlTE - SET MATTING BOARDS - PUSHERS
CAMP-GENERATOR SHOPS
21.00 - 22:30 1.50 MOB P PRE SPOT SHOP - CAMP - GENERATOR - JACK SUB UP
PREPARE TO MOVE ON WELL S-15i
22:30 - 00:00 1.50 MOB P PRE HOOK UP CATS BEGIN TO MOVE ONTO WELL
1/20/2002 00:00 - 01 :00 1.00 MOB P PRE FINISH SPOTTING SUB OVER WELL S- 151
01 :00 - 03:30 2.50 MOB P PRE LAY OUT MATTS FOR PIPE SHED AND SPOT 1ST SECTION
03:30 - 06:30 3.00 MOB P PRE LA Y OUT MATTS FOR PITS. SPREAD HERCULlTE - SPOT
PIT MODULE - LAYOUT MATTS FOR MOTOR MODULE
06:30 - 08:00 1.50 MOB P PRE SET MOTOR MODULE
08 00 - 09:00 1.00 MOB P PRE SET PUMP MODULE
09:00 - 10:00 1.00 MOB P PRE SET 2ND PIPE SHED MODULE
10:00 - 22.00 12.00 MOB P PRE HOOKING UP ALL SERVICE LINES TO ALL MODULES - SET
22.00 - 00:00 I PIPE SHED TIOGA - FIRE BOILERS GET STEAM THOUGH
OUT RIG
2.00 MOB P PRE NIPPLE UP SURFACE RISER - DIVERTOR
1/21/2002 0000 - 04.30 4 50 RIGU P PRE NIU DIVERTOR SYSYEM (ANNULAR) INSTALL 4" VALVE'S
ON CONDUCTOR
04:30 - 07 30 3.00 I RIGU P PRE NIU DRLG NIPPLE - FLOW LINE - SERVICE LINES IN
HALLWAY
07 30 - 11 :00 3 50 RIGU P PRE INSTALL KNIFE VALVE - DIVERTOR LINE
Pr,ntH :!/4/20ü2 1 I) 32 21 AII.,'
BP EXPLORATION Page 2 of 5
Operations Summary Report
Legal Well Name: MPS-15
Common Well Name: MPS-15 Spud Date: 1/22/2002
Event Name: DRILL +COMPLETE Start: 12/28/2001 End: 1/29/2002
Contractor Name: NABORS Rig Release: 1/29/2002
Rig Name: NABORS 27ES Rig Number: 27E
Date From - To Hours Activity Code NPT Phase Description of Operations
1/21 12002 11 :00 - 16:00 5,00 RIGU P PRE PICK UP TOOLS - CLEAN RIG - PREP RIG FLOOR FOR
PICKING UP DRILL PIPE AND BHA -INSTALL
TURNBUCKLES - CENTER RISER
16:00 - 17:00 1.00 RIGU P PRE WARM UP TOP DRIVE - TEST HYD FUNCTIONS - PJSM
FOR PICKING UP DRILL PIPE WHILE WARMING UP TOP
DRIVE
17:00-19:30 2,50 RIGU P PRE PICK UP SINGLES 5" DRILL PIPE FROM SHED - DRIFT
EACH JOINT PICKED UP
19:30 - 20:00 0.50' RIGU P PRE PRE SPUD MEETING WITH CREW
20:00 - 00:00 4,00 RIGU P PRE CON'T PICKING UP 5" DRILL PIPE FROM SHED
1/22/2002 i 00:00 - 02:00 2.00 RIGU IP PRE PIU 5" DRILL PIPE FROM PIPE SHED
! 02:00 - 03:30 1.50 RIGU P PRE FUNCTION TEST DIVERTOR SYSTEM - ACCUMULATOR
SYSTEM - ALL OPERATIONAL
03:30 - 05:00 1.50 RIGU P PRE SURFACE TEST EOUIPMENT - TEST MUD LINES I PUMPS
TO 3500 PSI OK - CIRC MUD THROUGH SYSTEM - ALL
OPERATIONAL
05:00 - 06.00 1.00 DRILL P SURF LOAD PIPE SHED WITH BHA - ARRIVED ON LOCATION AT
03:30 HRS
06:00 - 06:30 0.50 DRILL P SURF HELD PRE SPUD MEETING WITH DAY CREW
06:30 - 09:30 3.00 DRILL P SURF P/U BHA - WASH FROM 109' TO 112'
09:30 - 11 :00 1.50 DRILL P SURF SPUD WELL AT 09:30 HRS - DRILL FROM 112' TO 193'-
i RPM 70 - GPM 395 - PP 1100 - TO 2K - WOB 10K TO 15K
11:00 -11:30 0.50 DRILL P SURF PULL BACK TO 95'- FINISH PIU BHA
11 :30 - 00:00 12,50 DRILL P SURF DRILL FROM 193' TO 1159' - WOB 30K TO 35K - RPM 85 -
GPM 500 - PP 1650 - TO ON BTM 4K TO 5K - TO OFF BTM
2K TO 3K - PU 95K SO 95K ROT 95K - GRAVEL SIZE ON
S-PAD BIGGER THEN NORMAL AT MILNE PT - (SOME THE
SIZE OF A FIST)
1/23/2002 00:00 - 15:00 15.00 DRILL P SURF DIRECTIONAL DRILL FROM 1159' TO 2514' - WOB 35 - RPM
85 - GPM 500 - PP 1650 - TO 3K - 4K - PU 11 OK - ON 105K -
ROT 110K HYDRATE GAS TO SURFACE 2021' - NO
ISURF PROBLEMS - MUD CUT 9.3 TO 9.1
1500 - 15:30 0.50 DRILL P CBU - 3800 STKS - CONDITION MUD
1530 - 17:30 2.00 DRILL P SURF PUMP OUT TO 1200' - POOH TO HWDP - HOLE IN
EXCELLENT CONDITION - NO OVER PULLS NOTED
17.30 - 18:30 1.00 DRILL P SURF RIH TO TD 2514' - HOLE IN EXCELLENT CONDITION - NO
TIGHT SPOTS SEEN
18.30 - 20.00 1.50 DRILL P SURF CBU TWO TIMES 8000 STKS - MONITOR WELL - WELL
STATIC - PUMP DRY JOB - BLOW DOWN TOP DRIVE I
MUD LINES
20:00 - 21 :00 1 00 DRILL P SURF POOH TO HWDP - NO TIGHT SPOTS SEEN - HOLE IN
EXCELLENT SHAPE
21 :00 - 23:00 2.00 DRILL P SURF PULL TWO STANDS HEVI-WEIGHT STAND BACK - LAY
DOWN JARS I TWO JOINTS HEVI- WT - STAND BACK 6
STANDS HEVI-WT - LAY DOWN REST OF BHA - BREAK BIT
- TAKE BEND OUT OF MOTOR - FLUSH MOTOR
23.00 - 00:00 1.00 DRILL P SURF CLEAR FLOOR - CLEAN FLOOR - PJSM ON RIGGING UP
AND LOGGING WITH SCHLUMBERGER
1/24/2002 00.00 - 01 :00 1 00 DRILL P SURF RIG UP SCHLUMBERGER - PIU PEX/AIT/GR/DEN/NEU/DSI
TOOLS
01 00 - 05.30 4.50 DRILL P SURF RUN WIRE LINE LOGS - TRIPLE COMBO TOOL - FROM
BTM CONDUCTOR 112' TO TD 2514' - NO PROBLEMS
LOGGING HOLE
Pr,nlea 2/4/2002 1() 32 21 AM
BP EXPLORATION Page 3 of 5
Operations Summary Report
Legal Well Name: MPS-15
Common Well Name: MPS-15 Spud Date: 1/22/2002
Event Name: DRILL +COMPLETE Start: 12/28/2001 End: 1/29/2002
Contractor Name: NABORS Rig Release: 1/29/2002
Rig Name: NABORS 27ES Rig Number: 27E
Date From - To Hours Activity Code NPT Phase Description of Operations
1/24/2002 05:30 - 06:30 1.00 DRILL P SURF RIG DOWN SCHLUMBERGER LOGGING EQUIPMENT
06:30 - 07:00 0.50 CASE P SURF PJSM ON RIGGING UP CASING EQUIPMENT
07:00 - 08:00 1.00 CASE P SURF RIG UP 9 5/8" CASING EQUIPMENT
08,00 - 08:30 0.50 CASE P SURF PJSM ON RUNNING 9 5/8" CASING
08:30 - 12:00 3.50 CASE P SURF RAN 60 JOINTS OF 9 5/8" L-80 BTC 40# CASING - NO HOLE
PROBLEMS - LAND ON HANGER - SHOE @ 2499' - FLOAT
COLLAR @ 2416' - 15' RA THOLE BELOW SHOE - LAY
DOWN CASING EQUIPMENT
12:00 - 13:00 1.00 CASE P SURF CIRC BTM'S UP WITH FRANKS CIRC TOOL - STAGING UP
TO 8 BPM AT 500 PSI - GOOD RETURNS - NO LOSSES
13:00 - 13:30 0.50 CASE P SURF LAY DOWN FRANKS FILL UP TOOL - RIG UP CMT HEAD -
REGAIN CIRC @ 8 BPM AT 500 PSI
13:30 - 14:00 0.50 CASE P SURF PJSM ON CEMENTING AND DISPLACING CEMENT -
TRANFERING FLUIDS
14.00 - 18:00 4.00 CASE P SURF PUMP 5 BBLS WATER - TEST LINES TO 3000 PSI - 45 BBLS
OF WATER - 50 BBLS ALPHA SPACER @ 10.2 PPG WITH
RED DYE IN THE FIRST 20 BBLS PUMPED @ 3 BPM I 500
PSI - DROP BTM PLUG AFTER 45 BBLS SPACER PUMPED
- PUMP 370 BBLS 10,7 PPG LEAD CEMENT @ 5 BPM I 800
PSI- FOLLOWED BY 46 BBLS OF 15.9 PPG TAIL @ 3 BPM I
300 PSI - DROP TOP PLUG - DISPLACE WITH 30 BBLS
WATER FROM HOWCO - 153 BBLS MUD WITH RIG @ 8
BPM I 800 PSI - BUMP PLUG WITH 1800 PSI - 1000 PSI
OVER CIRC PSI - HELD FOR 1 MIN - RELEASE PRESSURE
- FLOATS HELD - 80 BBLS OF 10.7 PPG CEMENT TO
SURFACE
18:00 - 20:00 2.00 CASE P SURF FLUSH RISER I FLOW LINE - BLOW DN LINES - BACK OUT
LANDING JOINT - CLEAR FLOOR OF CASING TOOLS - LAY
DOWN LANDING JOINT
20:00 - 00:00 4.00 CASE P SURF NIPPLE DOWN DIVERTOR SYSTEM
1/25/2002 00.00 - 02:00 2.00 CASE P ¡SURF NIPPLE DOWN DIVERTOR SYSTEM
02:00 - 03.00 1.00 CASE P SURF NIU WELL HEAD FMC GEN 5 SYSTEM - TEST TO 1000 PSI
FOR 10 MINS - OK
03:00 - 07:30 4.50 CASE P SURF NU BOP'S
07:30 - 09:00 1.50 DRILL P INTl BODY TEST BOP'S - DOOR SEAL LEAKING - BTM PIPE
RAMS
09:00 - 11 :30 2.50 DRILL P INTl CHANGE OUT DOOR SEAL - BTM PIPE RAMS
11 :30 - 16:00 4.50 DRILL P INT1 TEST BOPS - ANNULAR - TOP RAMS - BTM RAMS - BLINDS
- CHOKE MANIFOLD - KILL LINE - CHOKE LINE - FLOOR
VALVES - TOP DRIVE IBOP UPPER - LOWER - 250 LOW 5
MINSI 2500 HIGH 5 MINS - PULL TEST PLUG -INSTALL
WEAR RING - JOHN CRISP WITH AOGCC WITNESS THE
TEST
16.00 - 17'00 1 00 DRILL P INT1 BLOW DOWN ALL TESTING EQUIPMENT - RIG DOWN
SAME
17:00 - 18:00 1 00 DRILL P INn RIG SERVICE - TOP DRIVE SERVICE
1 8 00 - 21. 30 3 50 DRILL P INn PU - BIT - BHA
21.30 - 2330 2 00 DRILL P INn RIH WITH 5" DRILL PIPE - TAG UP AT 2413' - FIC 2415'
23 30 - 00 00 0.50 DRILL P INTl CIRC HOLE TO LEVEL OUT MUD WEIGHT FOR CASING
TEST
1/26/2002 00.00 - 00.30 0.50 DRILL P INTl CIRC AND CONDITION MUD FOR CASG TEST
00.30 - 01 30 1.00 DRILL P INT1 R/U TO TEST 9 5/8" CASG - TEST 9 5/8" CASG FOR 30
MINS TO 2500 PSI - TEST GOOD
Pr,nlt?d 2/4/2002 103221 AM
BP EXPLORATION Page 4 of 5
Operations Summary Report
Legal Well Name: MPS-15
Common Well Name: M PS-15 Spud Date: 1/22/2002
Event Name: DRILL +COMPLETE Start: 12/28/2001 End: 1/29/2002
Contractor Name: NABORS Rig Release: 1/29/2002
Rig Name: NABORS 27ES Rig Number: 27E
Date From - To Hours I Activity I Code NPT Phase Description of Operations
1/26/2002 01 :30 - 03:00 1.50 DRILL P INT1 DRLG FLOAT EQUIPMENT AND 20' OF NEW HOLE TO
2534' - WOB 20 - RPM 60 - GPM 400 - PP 1500 - TQ 2K TO
4K
03:00 - 03:30 0.50 DRILL P INT1 CIRC AND CONDITION MUD - LEVEL OUT MUD WEIGHT -
TO RUN FIT
03:30 - 04:00 0,50 DRILL P INT1 PREFORM FIT - MD 2534' - TVD 2479' - MUD WEIGHT 8.6-
SURFACE PRESSURE 500 - EMW 12.48 - BLOW DOWN
KILL LINE
04:00 - 10:30 6.50 DRILL P INT1 DIRECTIONAL DRILL FROM 2534' TO 3548' - WOB 30 - RPM
85 - TQ 6K TO 7K - GPM 450 - PP 1850 - PU 140 - SO 120-
ROT 130
10:30 - 11 :30 1.00 DRILL P INT1 PUMP OUT 3548' TO 3059' - POOH FROM 3059' TO 2461'
HOLE EXCELLENT - NO TIGHT SPOTS - NO SWABBING
11 :30 - 12:00 0.50 DRILL P INT1 RIG SERVICE - TOP DRIVE SERVICE
12.00 - 12.30 0.50 DRILL P INT1 RIH FROM 2461' TO 3548' - NO TIGHT SPOTS SEEN ON
TRIP IN
12:30 - 00.00 11.50 DRILL P INT1 DIRECTIONAL DRILL FROM 3548' TO 4610' - WOB 30K TO
40K - RPM 70 - GPM 440 - PP 2050 - TQ 6K TO 7K - PU 165-
SO 130 - ROT 150 - MAX GAS 3960 @ 4190' - FLOW RATE
33% TO 72% - NO PIT GAIN
1/27/2002 00:00 - 02:00 2.00 DRILL INT1 DRILL FROM 4,610' TO TD AT 4,758' - PUMPING 418 GPM ,
1800 PSI, 30K WOB, 80 RPM, 1 OK TORQUE - NO
LUBRICANTS USED WILL DRILLlNG- BASE OB SAND AT
4,598'
02:00 - 03:00 1.00 DRILL INT1 PUMP 10.5 PPG HI-VIS WEIGHTED SWEEP. SWEEP CAME
BACK AT 3,360 STROKES. CONTINUE TO CIRCULATE
FOR 3 BU, SHAKERS CLEAN.
03:00 - 06:00 3.00 DRILL INT1 FLOW CHECK - POOH F/4,758' TO 4,516' SWABBING WITH
25K OVERPULL - PUMP F/4,516' TO 4.044' - POOH F/4,044
TO 2.461' - NO PROBLEMS
06:00 - 06.30 0.50 DRILL INT1 SERVICE TOP DRIVE
06:30 - 08,00 1.50 DRILL INT1 TIH F/2.461' TO 4,758' - NO PROBLEMS
08:00 - 08.30 0.50 DRILL INT1 PUMP 10.5 PPG HIGH VIS WEIGHTED SWEEP -
CIRCULATE AND CONDITION HOLE
08:30 - 09 30 1.00 DRILL INT1 DRILL FROM 4,758' TO 4,797' FOR PBTD RATHOLE
09:30 - 10:00 0 50 DRILL INT1 CIRCULATE AND CONDITION HOLE AT 4,797'
10:00 - 11 :30 1.50 DRILL INT1 MONITOR WELL - PULL 5 STANDS - PUMP DRY JOB &
POOH - HOLE IN GOOD SHAPE
11 :30 - 14:00 2.50 DRILL INT1 LAY DOWN BHA
14:00 - 1430 0.50 DRILL INT1 PJSM WITH SHLUMBERGER PRIOR TO RU WIRELlNE
EQUIPMENT
14:30 - 1500 0 50 DRILL INT1 RU SCHLUMBERGER - PIU PEX/AIT/GR/DEN/NEU/DSI
TOOLS
15'00 - 20'00 5 00 DRILL INT1 RIH TAG BOTTOM AT 4.786' WIRELlNE MEASUREMENT-
LOG 4.786 TO 9-5/8' CASING SHOE AT 2.499' - NO
PROBLEMS LOGGING HOLE
20.00 - 23 00 3 00 DRILL INT1 RIH WITH 45 SIDEWALL CORES - SHOT 45, RECOVERED
45
2300 - 23:30 0 50 DRILL INT1 RIG DOWN SCHLUMBERGER LOGGING EQUIPMENT
23 30 - 00 00 0 50 DRILL INT1 R/U NABORS 200 TON CASING RUNNING EQUIPMENT
1/28/2002 00.00 - 01 00 1.00 CASE P COMP RIG UP NABORS 200 TON CASING TOOLS
01.00-0130 0.50 CASE P COMP SAFETY MEETING WITH DRILL CREW ON RUNNING 7"
CASING
Pr,nled 2W2002 10 32 21 AM
BP EXPLORATION
Operations Summary Report
Page 5 of 5
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
MPS-15
MPS-15
DRILL +COMPLETE
NABORS
NABORS 27ES
Start: 12/28/2001
Rig Release: 1/29/2002
Rig Number: 27E
Spud Date: 1/22/2002
End: 1/29/2002
Date From - To Hours Activity Code NPT Phase Description of Operations
1/28/2002 01 :30 - 05:00 3.50 CASE P COMP RUN 60 JTS 7" 26# L-80 BTC-MOD 2,418'
05:00 - 05:30 0.50 CASE P COMP CIRCULATE AND THIN MUD, 5 BPM 300 PSI- CIRCULATE
ONE CASING VOLUME
05:30 - 08:00 2.50 CASE P COMP CONTINUE RUNNING 7" CASING - MAKE UP FMC 11 X 7"
FLUTED MANDRELL HANGER - LAND CASING - RAN
TOTAL 117 JTS 7" 26# L-80 BTC - MOD + 20' MARKER JT
4,752' SET AT 4788' - PBTD AT 4,703'
08:00 - 10:00 2.00 CASE P COMP CIRCULATE AND THIN MUD, STAGE UP TO 5 BPM 400 PSI,
RECIPROCATE PIPE 15' STROKES - CIRCULATE TWO
CASING VOLUME
10:00-10:30 0.50 CASE P COMP RIG DOWN FRANK'S FILL UP TOOL - RIG UP
HALLIBURTON 7" CEMENT HEAD AND LINES
10:30-11:00 0.50 CASE P COMP CONTINUE CIRCULATE - PRE JOB SAFETY MEETING
WITH DRILL CREW ON CEMENT JOB
11:00 - 13:30 2.50 CEMT P COMP TEST LINES 3000 PSI. PUMP 20 BBLS FRESH WATER
AHEAD, FOLLOW BY 50 BBLS 10.2 PPG ALPHA SPACER.
DROP BOTTOM PLUG, MIX AND PUMP 500 SX CLASS 'L'
CEMENT, YIELD 4.15 CF/SX, 184 BBS SLURRY MIXED AT
10.7 PPG TAILED WITH 225 SX CLASS 'G' WI .2% CFR-3 +
,3 % HALAD 344, YIELD 1,1S CF/SX, 46 BBLS SLURRY
MIXED AT 1S.8 PPG - WASH OUT CEMENT LINES, DROP
TOP PLUG AND DISPLACE WITH 122 BBLS OF WARM
DIESEL (3,18S') + 58 BBLS OF 8.6 KCL WATER - BUMP
PLUG TO 800 PSI OVER - AVERAGE DISPLACE RATE 4.8
BBL/MIN - FULL RETURNS - 80 BBLS OF 10.7 PPG CEMENT
TO SURFACE - RECIPROCATE PIPE UNTIL CEMENT
AROUND SHOE- FLOAT HELD- CIP AT 1333 HRS 1/28/02
13:30-14:00 0.50 CEMT P COMP FLUSH OUT BOP AND FLOW LINE WITH WATER
14:00 - 21:00 7.00 CEMT P COMP OPEN DOORS AND EACH RAM OF BOP STACK AND
FLUSH OUT WITH WATER. WASH BEHIND EACH RAM
BLOCK - CLOSE DOORS
21 :00 - 22:30 1.50 WHSUR P COMP LAY DOWN LANDING JT. - CHANGE BAIL - PICK UP STAND
OF HWT - INSTALL FMC 7" PACK-OFF - TEST PACK-OFF
TO 5000 PSI
22:30 - 00:00 1.50 WHSUR P COMP INSTALL FMC FALSE TUBING HANGER BOWL WITH FMC
7" 'ISA' BPV - TEST BPV TO 1000 PSI - OK
1/29/2002 00:00 - 03:00 3.00 BOPSUR P COMP NIPPLE DOWN AND SET BACK 135/8" SOOO# BOP STACK
03:00 - OS:OO 2 00 WHSUR P COMP NIPPLE UP FMC 11" X 7 1/16 SOOO# HOLD DOWN ADAPTER
FLANGE- TEST PACK-OFF TO SOOO PSI FOR 10 MINUTES -
NIPPLE UP 7 1/16" SOOO# MASTER VALVE WITH TREE CAP
AND GAUGE
05:00 - 06:00 1 00 EVAL P COMP RIG UP HB&R TO 7" CASING - PRESSURE TEST CASING
TO 4S00 PSI WITH DIESEL FOR 30 MINUTES ON CHART-
BLED TO 4400 PSI IN 30 MINUTES - OK
06.00 - 08:00 2.00 RIGD P COMP PICK UP TOOLS AND HOSES, CLEAN OUT CELLAR -
RELEASE RIG AT 0800 HRS 1/29/02
Pr,nlp.O "2/.3/2002 103221 AM
Legal Well Name:
Common Well Name:
Event Name:
Contractor Name:
Rig Name:
4/25/2002
4/26/2002
BP EXPLORATION
Operations Summary Report
MPS-15
M PS-15
COMPLETION
NABORS
NABORS ~
~~~
Page 1 of 1
Start: 4/26/2002
Rig Release:
Rig Number: 2iIii.i-4 €.~
Spud Date:
End: 4/26/2002
Date
From - To Hours I Activity Code NPT Phase
Description of Operations
10.00 - 18.00
18:00 - 19:00
19.00 - 20:30
20:30 - 22:00
22.00 - 00:00
00:00 - 03:00
03:00 - 04:00
! 04:00 - 08:00
! 08:00 - 12:30
I
I
12:30 -13:00
13:00 - 14:30
14:30 - 15:30
15:30 - 16:00
16:00 - 18.30
18:30 - 20:30
20:30 - 22:00
8.00 RIGU P
1.00 WHSUR ¡ P
!
1.50 BOPSUR P
1.50 BOPSURP
PRE
CaMP
CaMP
¡CaMP
ICOMP
CaMP
CaMP
2.00 CASE P
3.00 CASE P
1.00 KILL P
4.00 PULL P
4.50 RUNCOI\tP
CaMP
CaMP
0 50 RUNCOI\tP
1.50 BOPSURP
1.00 WHSUR P
0.50 I WHSUR P
2.50 I CHEM P
CaMP
CaMP
CaMP
CaMP
CaMP
2.00 DHEQP P
CaMP
1.50 WHSURIP
CaMP
Mil RU AND SAFE OUT EQUIPMENT.
CHECK PRESSURE ON WELL & PULL TWC & SET BPV &
¡ NIPPLE DN TREE.
NIPPLE UP BOP
TEST BOP TO 250 LOW & 2500 HIGH. (TEST WAIVED BY
CHUCK SHEVE WITH AOGC. )
LOAD PIPE SHED WITH TBG. & STRAP SAME.
RIH WITH 3.5" TBG. & MULE SHOE TO 3500'
CIRC FREEZE PROTECTION FROM WELL BORE TO TIGER
TANK WITH 8.5 PPG. SEA WATER.
POOH LAYING DN 3.5" TBG.
RIG UP & RIH WITH BAKER "S-3" PKR. TO SETTING
DEPTH 4275'
MU HANGER & LAND SAME & RILDS, & SET TWC.
NIPPLE DN BOP
NIPPLE UP TREE.
PRESSURE TEST TREE & EQUIPMENT TO 5000 PSI.
RIG LINES & TEST & PUMP 65- BBL. SEA WATER
TREATED WITH 1- BBL. COREXIT & FOLLOW WITH 75 BBL.
DIESEL DOWN ANNULUS & U-TUBE TO TBG. FOR FREEZE
PROTECTION.
DROP 1-5/16" BALL & SET PKR. TO 4000 PSI. ON TBG.. &
HOLD FOR 30-MIN & BLEED TBG. TO 1500 PSI. &
PRESSURE ANNULUS TO 3000 PSI. & HOLD FOR
30-MINUTES. ALL TEST OK.
SET BPV & RIG DOWN TEST EQUIPMENT & SECURE
TREE AREA.
P"nlea 4/30/2002 31433 PM
Well:
Field:
API:
Permit:
MPS-15
Milne Point Unit / Schrader Bluff
50-029-23061-00
201-245
POST RIG WORK
04/28/02
MIRU ELINE, RIH WITH 2.5" 2506 PJ HMX GUN, PERF 4576-4596, RIH WITH 2ND GUN, PERF 4523-
4543, WHP AFTER INTIAL PERF 250 PSI, WHP AFTER 2ND GUN 0 PSI, RDMO.
AOGCC
333 W. 7th Ave. Suite 100
Anchorage, AK 99501
Definitive
Re: Distribution of Survey Data for Well MPS-15
Dear Dear Sir/Madam:
Enclosed are two survey hard copies and 1 disk
Tie-on Survey:
Window / Kickoff Survey
Projected Survey:
0.00' MD
, MD (if applicable)
4,797.39' MD
Please call me at 273-3545 if you have any questions or concerns.
Regards,
William T. Allen
Survey Manager
Attachment(s)
RECEIVED
FEB 0 7 2002
AIa8ka Oil & Gas Cons. Comrni88to..
Ana'KIage
62;67 ~ ¿; t./ S
06-Feb-02
BP EXPLORA TION (ALASKA) INC.
Milne Point Unit
Alaska Drilling & Wells
MPS-Pad Dev Working, Slot MPS-15
MPS-15
Job No. AKZZ22015, Surveyed: 27 January, 2002
SURVEY REPORT
7 February, 2002
Your Ref: 500292306100
Surface Coordinates: 5999991.03 N, 565874.93 E (70024'37.4977" N, 149" 27'48.9462" W)
Surface Coordinates relative to Project H Reference: 999991.03 N, 65874.93 E (Grid)
Surface Coordinates relative to Structure: 20.18 N, 469.91 W (True)
Kelly Bushing: 73.20ft above Mean Sea Level
spe.-..-.y-sul'l
DRILLING SERVICES
A Halliburton Company
Survey Ref: svy10055
Sperry-Sun Drilling Services .
Survey Report for MPS-15
Your Ref: 500292306100
Job No. AKZZ22015, Surveyed: 21 January, 2002
BP EXPLORATION (ALASKA) INC. Alaska Drilling & Wells
Milne Point Unit MPS-Pad Dev Working
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastlngs Northlngs Eastlngs Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) ("/1 OOft)
000 0 UOO 0.000 - 73.20 0,00 O.OON 0.00 E 5999991.03 N 565874.93 E 0.00 AK.6 BPJFR.AK
185.05 0 3.30 46,690 111.85 185.05 O,37N 0.39 E 5999991.40 N 565875,31 E 0178 034
27851 0380 46.550 205,31 278,51 0.76N 0.81 E 5999991.80 N 565875.73 E 0.054 071
364.95 0500 30.990 291.74 364.94 1.28 N 1.21 E 5999992.32 N 565876.13 E 0.195 1,21
456 09 0540 3 100 382 88 456.08 2,05 N 1.44 E 5999993,10 N 565876,35 E 0278 196
546.90 0800 14.720 473.68 546,88 3.09 N 1.62 E 5999994.14 N 565876.53 E 0.322 2.99
639 22 0810 30.690 566 00 639.20 4,28 N 2,12 E 5999995,33 N 565877,01 E 0.242 4.14
731 97 0900 64710 658.74 731 ,94 5.15 N 3.11 E 5999996.21 N 565878.00 E 0547 495
824.70 1 210 80 080 751 .45 824.65 5.63 N 4.74 E 5999996.70 N 565879,62 E 0.450 5.33
920.99 1200 78,490 847.72 920.92 6,01 N 6.73 E 5999997,10 N 565881.60 E 0.036 558
1 009 05 1.510 36.550 935.76 1 008 96 7.13 N 8.32 E 5999998.23 N 565883,19 E 1.149 6.60
1103.86 2440 6790 1030.51 11 03.71 10.13 N 9.30 E 6000001.24 N 565884,14 E 1 .429 9.54
1195 53 3360 357 130 11 22 06 1195.26 14.75 N 9.40 E 6000005.87 N 565884,20 E 1.133 14 14
1290.20 5.800 356.470 1216.42 1289,62 22.30 N 8.97 E 6000013.41 N 565883.70 E 2.578 21. 70
1 384 06 7640 357.260 1309 64 1382.84 33,27 N 8,38 E 6000024,37 N 565883.01 E 1 963 32.68
1476.70 7580 357.840 1401.46 1474,66 45.52 N 7.85 E 6000036.62 N 565882,38 E 0,105 4495
1572.00 7.890 357.650 1495.89 1569.09 58,34 N 7,35 E 6000049.43 N 565881.76 E 0326 57.77
1666,11 8090 358.980 1589,09 1662.29 71.42 N 6.96 E 6000062.50 N 565881 .26 E 0.289 70.85
1 759 98 9.680 354 640 1681.83 1755,03 85,88 N 6.11 E 6000076.96 N 565880,28 E 1 837 8533
1 850 1 1 11.800 352.510 1770.38 1843,58 102,56 N 4,20 E 6000093.62 N 565878.22 E 2.393 102.10
1946.38 12 420 350.010 1864.50 1937.70 122,52 N 1.12 E 6000113.55 N 565874,97 E 0843 12221
2037 47 13910 354.670 1953.20 2026.40 143.07 N 1.60W 6000134.08 N 565872,07 E 2,007 142.89
2 1 36 1 3 15810 356.470 2048 56 2121 ,76 168.29 N 3,53W 6000159.28 N 565869.92 E 1 982 168 19
2230 84 19.990 357 470 2138.66 2211.86 197,35 N 5.04W 6000188.33 N 565868.15 E 4425 19729
2324 60 25.630 357 1 fiO 2225.06 2298.26 233,65 N 6.75W 6000224.61 N 565866.12 E 6017 233.62
2420 40 29.720 356.890 2309,88 2383.08 278,07 N 9.07W 6000269.01 N 565863.41 E 4.271 278.10
2458 93 30.850 356.370 2343.15 2416.35 297.47 N 10.21 W 6000288.40 N 565862,10 E 3011 297.53
2590,38 33.360 357 61 0 2454.49 2527.69 367,23 N 13,85 W 6000358,12 N 565857.84 E 1 974 .167 38
2679 71 33 880 353 720 2528.89 2602.09 416,52 N 17.60 W 6000407.38 N 565853,66 E 2480 41681
277749 33 740 353.190 2610 1 3 2683.33 470.58 N 23,80 W 6000461.38 N 565846.98 E 0334 471 15
. ------------------"-------------- "---- ---"
6 February. 2002 - 2: 58
Page2of4
DliIIQuest 200.09.008
.'..
Sp~rry-Sun Drilling Services .
Survey Report for MPS-15 ~
Your Ref: 500292306100
Job No. AKZZ22015, Surveyed: 21 January, 2002
BP EXPLORATION (ALASKA) INC. Alaska Drilling & Wells
Milne Point Unit MPS-Pad Dev Working
Measured Sub-Sea Vertical Local Coordinates Global CoordInates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft)
2871 73 33 730 354 390 2688.50 2761.70 522,60 N 29,46 W 6000513,35 N 565840.86 E 0.707 523.43
2963 1 3 33 690 354 970 2764.53 2837.73 573,11 N 34,17 W 6000563,82 N 565835,71 E 0.355 574.13
3058 44 33970 356.430 2843.71 2916.91 626.02 N 38. 14 W 6000616,69 N 565831.27 E 0902 62718
3151.97 32.050 356.490 2922.14 2995.34 676.87 N 41.29 W 6000667.51 N 565827.67 E 2053 67813
3242 32 28 730 354 340 3000.06 3073.26 722.42 N 44,90 W 6000713.03 N 565823.66 E 3.866 723 82
3334.92 26 880 354.720 3081 97 3155,17 765.42 N 49.02 W 6000755,99 N 565819.16 E 2.007 766.99
3429 47 24 580 353 850 3167.14 3240.34 806,26 N 53.09 W 6000796.79 N 565814.73 E 2.465 808.00
352204 21 590 353.220 3252 29 3325.49 842,32 N 57.17W 6000832.82 N 565810.33 E 3.241 844.25
3613 1 3 19280 355 490 3337.64 3410,84 873,96 N 60.33 W 6000864.43 N 565806.89 E 2.681 876.02
3707 44 15.480 354 930 3427,63 3500,83 902.03 N 62.67 W 6000892.47 N 565804.31 E 4.033 904 1 8
3800 58 11.990 354 270 35 18 09 3591.29 924,04 N 64.73 W 6000914,47 N 565802.05 E 3.751 926.28
389736 7860 356 130 3613.40 3686.60 940,66 N 66,18 W 6000931,07 N 565800.45 E 4280 94295
3988 43 4450 355 890 3703.93 3777.13 950.40 N 66.86 W 6000940.80 N 565799,69 E 3744 95271
4083 18 4420 358.000 3798.40 3871.60 957,71 N 67.25 W 6000948.11 N 565799.24 E 0 175 960.04
4175.35 2770 346 620 3890,39 3963,59 963.43 N 67.89 W 6000953.82 N 565798.55 E 1.942 965.78
4272.35 1.400 18.760 3987.32 4060.52 966,83 N 68,05 W 6000957.22 N 565798,36 E 1.805 969.19
4364.73 1320 29.510 4079.68 4152,88 968.82 N 67,16 W 6000959.22 N 565799,23 E 0.289 971 12
4458.03 1630 25.220 4172.95 4246.15 970,96 N 66,07 W 6000961.37 N 565800,30 E 0.352 973.19
4551.81 1.790 31.080 4266.68 4339.88 973.42 N 64.74 W 6000963.84 N 565801.61 E 0.253 975.56
4646 68 2 140 26.200 4361.50 4434.70 976,28 N 63,19 W 6000966.71 N 565803.13 E 0.409 978 32
4738.65 1730 29.460 4453.42 4526.62 979,03 N 61 ,75 W 6000969.48 N 565804,54 E 0461 980 9ì
4797.39 1 730 29.460 4512.13 4585.33 980,57 N 60,88 W 6000971.03 N 565805,40 E 0.000 982 46 Projected Surv¡:.y
All data is In Feet (US) unless otherwise stated Directions and coordinates are relative to True North.
Vertical depths are relative to Well. Northings and Eastings are relative to Well.
Magnetic Declination at Surface is 26.065° (06-Feb-02)
The Dogleg Severity IS in Degrees per 100 feet (US).
Vertical Section IS from Well and calculated along an Azimuth of 356.447Q (True),
Based upon Minimum Curvature type calculations, at a Measured Depth of 4797,39f1..
The Bo"om Hole Displacement is 982.46ft., in the Direction of 356,44]0 (True),
- - - -- -----------
--- - -- ----
6 February. 2002 - 2:58
Page 3 of 4
ÐrillQuf>sl 2 00.09,008
Spèrry-Sun Drilling Services
Survey Report for MPS-15
Your Ref: 500292306100
Job No. AKZZ22015, Surveyed: 21 January, 2002
.
BP EXPLORATION (ALASKA) INC.
Milne Point Unit
Alaska Drilling & Wells
MPS-Pad Dev Working
Comments
Measured
Depth
(ft)
Station Coordinates
TVD Northings Eastings
(ft) (ft) (ft)
Comment
4797.39
4585.33
980.57 N
60.88 W
Projected Survey
Survey tool program for MPS-15
From
Measured Vertical
Depth Depth
(ft) (ft)
To
Measured Vertical
Depth Depth
(ft) (ft)
Survey Tool Description
000
000
4797 39
4585.33 AK-6 BP _IFR-AK
--- --- ------
6 February. 2002 - 2:58
Page 4 of4
OrillQuesI2.00.09.008
AOGCC
333 W. 7th Ave. Suite 100
Anchorage, AK 99501
06-Feb-02
Re: Distribution of Survey Data for Well MPS-15 MWD
Dear Dear Sir/Madam:
Enclosed are two survey hard copies and 1 disk
Tie-on Survey:
Window / Kickoff Survey
Projected Survey:
0.00' MD
, MD (if applicable)
4,797.39' MD
Please call me at 273-3545 if you have any questions or concerns.
Regards,
William T. Allen
Survey Manager
Attachment( s)
RECEIVED
FEB 0 7 2002
AIa8Iœ at & Gas Cons. Comrnis8icJt¡
Anchorage
êiðd;'¿Yl/5
BP EXPLORA TION (ALASKA) INC.
Milne Point Unit
Alaska Drilling & Wells
MPS-Pad Dev Working, Slot MPS-15
MPS-15 MWD
Job No. AKMW22015, Surveyed: 27 January, 2002
SUR VE Y R E P 0 R T
7 February, 2002
Your Ref: 500292306100
Surface Coordinates: 5999991.03 N, 565874.93 E (70024' 37.4977" N, 149027' 48.9462" W)
Surface Coordinates relative to Project H Reference: 999991.03 N, 65874.93 E (Grid)
Surface Coordinates relative to Structure: 20.18 N, 469.91 W (True)
Kelly Bushing: 73.200 above Mean Sea Level
spe...,...,y-sul'l
DRILLING SERVices
A Halliburton Company
Survey Ref: svy10054
Sp-erry-Sun Drilling Services .
Survey Report for MPS-15 MWD
Your Ref: 500292306100
Job No. AKMW22015, Surveyed: 21 January, 2002
BP EXPLORATION (ALASKA) INC. Alaska Drilling & Wells
Milne Point Unit MPS-Pad Dev Working
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl. Azim. Depth Depth Northlngs Eastlngs Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (o/100ft)
0.00 0000 0000 -73.20 0,00 0.00 N 0.00 E 5999991.03 N 565874,93 E 0.00 MWD Magnetic
185.05 0330 46.870 1 1 1. 85 185.05 0.36 N 0.39 E 5999991.40 N 565875.32 E 017R 034
27851 0380 46 550 205.31 278.51 0,76 N 0,81 E 5999991,80 N 565875.73 E 0.054 071
364 95 0500 31600 291. 74 364,94 1,28 N 1,22 E 5999992.32 N 565876,13 E 0.191 121
456 09 0540 3060 382.88 456,08 2,05N 1 .45 E 5999993.09 N 565876.36 E 0.284 196
546.90 0.800 14.980 473,68 546.88 3,09N 1.63 E 5999994.13 N 565876,54 E 0.323 2.99
639 22 0810 31070 566 00 639.20 4.27 N 2,14 E 5999995.32 N 565877,03 E 0.244 4.14
731 97 0900 65 000 658.74 731 94 5.14 N 3,14 E 5999996.20 N 565878.02 E 0.546 495
824 70 1 210 80 400 751 45 824.65 5,61 N 4.76 E 5999996.68 N 565879.64 E 0.450 532
920.99 1 2no 78 750 847.72 920.92 5,98 N 6.75 E 5999997.06 N 565881.63 E 0038 557
1 009 05 1 510 36.900 935.76 1 008 96 7,08N 8.35 E 5999998.19 N 565883,22 E 1.147 658
1103.86 2440 7 160 1030.51 1103.71 10,08 N 9.36 E 6000001.20 N 565884.20 E 1.429 952
1195.53 3 3f;0 357 530 1122 06 1195.26 14,70 N 9.48 E 6000005.82 N 565884.28 E 1.132 14 12
1290.20 5.800 356.960 1216.42 1289.62 22.25 N 9.11 E 6000013.36 N 565883.84 E 2.578 21 68
1384.06 7640 357 440 1309.64 1382.84 33.22 N 8,58 E 6000024.33 N 565883,22 E 1 961 32.67
1476.70 7.580 358 000 1401.46 1474.66 45.48 N 8.09 E 6000036.58 N 565882.62 E 0.103 44.93
1572.00 7.890 357.870 1495.89 1569.09 58.30 N 7.63 E 6000049.40 N 565882.04 E 0.326 57.75
1 666. 11 8090 359.250 1589.09 1662.29 71.38 N 7,30 E 6000062.47 N 565881.60 E 0.294 70.83
1 759 98 9.680 354,680 1681.83 1755,03 85,84 N 6.48 E 6000076.92 N 565880.66 E 1.852 85.31
1 850 11 11.800 352.510 1770.38 1843.58 102.52 N 4.58 E 6000093.59 N 565878.61 E 2.394 10208
1946 38 12420 349.770 1864.50 1937.70 122,47 N 1.46 E 6000113,51 N 565875,31 E 0.878 122.18
203747 13910 354 590 1953.20 2026.40 143.01 N 1,31 W 6000134,03 N 565872,35 E 2030 14285
21 36 1 3 15810 356480 2048.56 2121.76 168,24 N 3.26W 6000159.23 N 565870,19 E 1.987 168.14
2230 84 19990 357 970 2138.66 2211.86 197,31 N 4,62W 6000 188,29 N 565868,57 E 4.440 187.24
2324 60 25 630 357510 2225.06 2298.26 233.61 N 6.07W 6000224.58 N 565866,80 E 6.018 233.57
2420 40 29 720 357.360 2309.88 2383,08 278.05 N 8.07W 6000269.00 N 565864.41 E 4.270 27805
2458 93 30 850 356 1 80 2343.15 2416,35 297.45 N 9.17W 6000288.39 N 565863.14 E 3.314 29748
2590 38 33 360 357800 2454.49 2527.69 367.21 N 12.80 W 6000358.11 N 565858.89 E 2,019 367 33
2679 71 33 88r) 354 000 2528.89 2602,09 416,52 N 16.35 W 6000407.39 N 565854.91 E 2426 <1 1 6 76
2777 49 33740 353 390 2610.13 2683,33 470,60 N 22.32 W 6000461.41 N 565848.46 E 0376 471 10
- - -- --- .
- --. -- --- - -- - -----
----------- --------
6 February. 2002 - 3:03
Page2of4
DfillQuesl 200.09,008
~.
~.
Sperry-Sun Drilling Services .
Survey Report for MPS-15 MWD ~
Your Ref: 500292306100
Job No. AKMW22015, Surveyed: 21 January, 2002
BP EXPLORATION (ALASKA) INC. Alaska Drilling & Wells
Milne Point Unit MPS-Pad Dev Working
Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical
Depth Incl, Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment
(ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft)
2871 73 33 ì30 354.700 2688.50 2761. 70 522.65 N 27.75 W 6000513,41 N 565842.57 E 0.772 523.38
2963. 1 3 33.690 355.130 2764.54 2837.74 573,17 N 32,25 W 6000563.90 N 565837.63 E 0.265 574.08
3058.44 33.970 356.520 2843,71 2916.91 626,09 N 36.11 W 6000616.78 N 565833.30 E 0.863 627 1 3
3151,97 32.050 356.580 2922.14 2995,34 676,95 N 39,17 W 6000667.61 N 565829,79 E 2.053 6 ì8 08
3242 32 28 ì30 354.580 3000.07 3073.27 722.51 N 42,66 W 6000713.14 N 565825.90 E 3841 72377
3334 92 26 880 355.000 3081.97 3155.17 765,53 N 46.58 W 6000756,12 N 565821.60 E 2.009 766.94
3429.4 ì 24 580 354.060 316714 3240.34 806.38 N 50.48 W 6000796.94 N 565817.34 E 2470 807.96
3522.04 21590 353.480 3252.29 3325.49 842.46 N 54.41 W 6000832.98 N 565813,09 E 3.239 844 20
36 1 3 1 3 19280 355.750 3337.64 341 0 84 874.11 N 57.43 W 6000864,60 N 565809,80 E 2.681 875.98
3707 44 15 480 355.220 3427.63 3500 83 902.19 N 59.63 W 6000892.66 N 565807.34 E 4.033 904.14
3800 58 11990 354 530 3518.09 3591 .29 924,22 N 61,59W 6000914.67 N 565805.19 E 3.751 926.24
3897.36 7.860 356.350 3613.40 3686.60 940,84 N 62.97 W 6000931.27 N 565803.67 E 4.279 94291
3988 43 4450 356.250 3703.93 3777.13 950,58 N 63.60 W 6000941.01 N 565802.95 E 3.744 952.67
4083 18 4420 358.190 3798.40 3871.60 957,90 N 63.95 W 6000948.32 N 565802,53 E 0.161 960.00
4 1 75 35 2770 346 690 3890.39 3963 59 963,61 N 64.58 W 6000954.04 N 565801.86 E 1.945 965 74
4272 35 1 400 19.040 3987.32 4060.52 967.01 N 64,73 W 6000957.44 N 565801.67 E 1.809 969.15
4364 73 1320 29.550 4079.68 4152.88 969.01 N 63.84 W 6000959.44 N 565802,55 E 0.283 971.08
4458.03 1630 25.410 4172.95 4246,15 971.14 N 62.74 W 6000961.58 N 565803,63 E 0.351 973 15
4551 81 1790 31 .440 4266.69 4339.89 973.59 N 61.40 W 6000964,05 N 565804,94 E 0.257 975 52
4646 68 2 140 26 51 0 4361.50 4434.70 976.44 N 59.84 W 6000966.91 N 565806.48 E 0.409 978.2ì
4738.65 1 730 29.620 4453.42 4526.62 979,19 N 58,39 W 6000969.66 N 565807,91 E 0460 980.93
4797.39 1730 29.620 4512.13 4585.33 980,73 N 57.51 W 6000971.21 N 565808.77 E 0000 982.41 ProJPr;tRrj Survey
All data IS In Feel (US) unless otherwise stated. Directions and coordinates are relative to True North.
Vertical depths are relative to Well. Northings and Eastings are relative to Well.
Magnetic Declination al Surface is 26.065° (06-Feb-02)
The Dogleg Severity is In Degrees per 100 feel (US).
Vertical Section is from Well and calculated along an Azimuth of 356.644° (True).
Based upon Minimum Curvature type calculations. al a Measured Depth of 4797.300"
The Bottom Hole Displacement is 982 41 ft.. in the Direction of 356.644° (True),
--------. -
6 February. 2002 - 3:03
Page 3 of 4
DrillQuest 2.00.09.008
Spèrry-Sun Drilling Services
Survey Report for MPS-15 MWD
Your Ref: 500292306100
Job No. AKMW22015, Surveyed: 21 January, 2002
8.
BP EXPLORATION (ALASKA) INC.
Milne Point Unit
Alaska Drilling & Wells
MPS-Pad Dev Working
Comments
Measured
Depth
(ft)
Station Coordinates
TVD Northlngs Eastings
(ft) (ft) (ft)
Comment
4797.39
4585 33
980.73 N
57,51 W
Projected Survey
Survey tool program for MPS-15 MWD
Fro m
Measured Vertical
Depth Depth
(ft) (ft)
To
Measured Vertical
Depth Depth
(ft) (ft)
Survey Tool Description
000
000
4797,39
4585,33 MWD Magnetic
- - -- --- --.-
----------
6 February. 2002 - 3:03
Page 4 of 4
Dril/Ollesl 200.09.008
\IJ(l/\ L/ f I ¡ l c, 2-
I STATE OF ALASKA) ;/~-i.-\: (, -
ALASKA OIL AND GAS CONSERVATION COMMISSION bì5 ~ \;1 q
APPLICATION FOR SUNDRY APPROVAL I
1. Type of Request: 0 Abandon 0 Suspend 0 Plugging 0 Time Extension 0 Pertorate
0 Alter Casing 0 Repair Well 0 Pull Tubing 0 Variance 1m Other
0 Change Approved Program 0 Operation Shutdown 0 Re-Enter Suspended Well 0 Stimulate Run Completion Tubing ~
2. Name of Operator
BP Exploration (Alaska) Inc.
3. Address
P.O. Box 196612, Anchorage, Alaska 99519-6612
5. Type of well:
0 Development
0 Exploratory
0 Stratigraphic
181 Service ~.
6. Datum Elevation (DF or KB)
KBE = 73.20'
7. Unit or Property Name
Milne Point Unit
4. Location of well at surface
3322' NSL, 136' WEL, SEC. 12, T12N, R10E, UM
At top of productive interval
4294' NSL, 201' WEL, SEC. 12, T12N, R10E, UM
At effective depth
4300' NSL, 198' WEL, SEC. 12, T12N, R10E, UM
At total depth
4302' NSL, 196' WEL, SEC. 12, T12N, R10E, UM
12. Present well condition summary
Total depth: measured
true vertical
8. Well Number
MPS-15i
9. Permit Number
201-245
10. API Number
50- 029-23061-00
11. Field and Pool
Milne Point Unit 1 Schrader Bluff
Effective depth: measured
true vertical
4797 feet
4585 feet
4703 feet
4491 feet
Plugs (measured)
Junk (measured)
Casing
Structural
Conductor
Surface
Intermediate
Production
Liner
Length
Size
Cemented
MD
TVD
77'
2464'
20"
9-5/8"
260 sx Arctic Set (Approx.)
501 sx Class 'L', 225 sx Class 'G'
112'
2499'
112'
2451'
4756'
7"
249 sx Arctic Set I, 225 sx Class 'G'
4788'
4576'
Perforation depth: measured
NIA
RECEIVED
true vertical
Tubing (size, grade, and measured depth)
NIA
APR 1 8 20U;
AlBaOiI & Gas Cons. Commission
Anchorage
Packers and SSSV (type and measured depth) NIA
13. Attachments
181 Description Summary of Proposal
0 Detailed Operations Program
15. Status of well classifications as:
0 Oil 0 Gas 0 Suspended
0 BOP Sketch
14. Estimated date for commencing operation
April 24, 2002 ./
16. If proposal was verbally approved
Service Water Injection
Name of approver Date Approved
Contact Engineer Name/Number: Steve Campbell, 564-4401
17. I ~erebY certify th~~nr{irue and correct to the best of my knowledge
Signed Paul Cha~ - J<.....I ~ Title Drilling Engineer
Commission Use Only
Conditions of Approval: Notify Commission so representative may witness "< GL' c.::. l>~' \ "ðG \?~ ~.~ A I N
'\. I ../ \ '::> ~ I pprova o.
Plug integrity - BOP Test ~ Location clearance -
Mechamcallntegrity Test L Subsequent form required 10- l4. G '1
Approved by order of the Commission Ca,~ (~~ ~'!'f':'\ i
Form 10-403 Rev. 06/15/88 0 ',-,,' ij- \ 'j ;'l ¡D':I I'. \ ~-
Prepared By NameINumber: Sandra Ste, wman 564-4750
Date Â'P t2- (1, 0 '--
? ,,-. ~, '-:. ~,
----' v' c::>-l - /_c.:.--
Commissioner
Date t./ 119/0 .)-
Submit In Triplicate
Schrader Bluff S-15 Injection Well Completion
1.
2.
3.
4.
5.
6.
7.
MIRU N4ES.
ND Tree/NU BOPE. ¡
RIH with 7" packer on 3-1/2" BTC tubing."
Land tubing and freeze protect well.
Set pacl(cr.~t 1275' MD. -,' 1U6A-
ND BOPE/NU Tree.
RDMO N4ES.
Post rig work: Perforate the Schrader Bluff OA and OB sands.
---
'.,.,- .,,,, ~ I)' t ý f .;.' ':. t .' Vl, :,
,. '- \ I
OA
Perfs
08
Perfs
j
~ f
~ .~
¡~
~:1
¡ :J
, ,I
'.
;
:: ;I
. ~
'.. I¡
:~
1
- ~
II!
i :
! j
"
~ r,
~: ~¡
~: ~
" :}
: 1
! :1
~ ~
t ;!
~, ~
! ~
¡ ~
) "
~ ;
Ii '
. ¡
¡ ¡
t' ~~
.~f
¡;~
I ~
, f
I
.
r
r
" j
~-
)
S-15 Injector Completion Diagram
(PROPOSED 4-16-02)
~
Tubing hanger connection 4-1/2" NSCT pin
x-over pup 4-1/2" NSCT box X 3-1/2" 18T pin
3-1/2" 9.3# L80 18T tubing
3-1/2" 'X' nipple (2.813') set at -2200' md
3-1/2" 9.3# L80 18T tubing
3-1/2" 18T box X 4-1/2" NSCT Pin x-over
7" x 4-1/2" packer - 8aker S-3 (set at -4275' md)
4-1/2" NSCT box X 3-1/2" 18T pin x-over
3-1/21111 9.3# L80 pup jt (-10')
3-1/2" 'XN' nipple with 2.75" no-go
3-1/2" 9.3# L80 pup jt (-10')
Re-entry guide
7", 26#, L-80, BTC-M R3
~OJ-d'l5
WELL LOG TRANSl\tITTAL
To:
State of Alaska
Alaska Oil and Gas Conservation Camm.
Ann,: Lisa Weepie
333 West 7th Avenue, Suite 100
Anchorage, Alaska 9950 I
l\'larch 21, 2002
RE:
l\1\VD Fonl1ation Evaluation Logs l\1PS-15,
AK-l\~1-220 15
I LIS fonnatted Disc \tvith verification listing,
API#: 50-029-23061-00
PLEASE ACKNO\VLEDGE RECEIPT BY SIGNING A COpy OF THE TRANSMITTAL LETTER TO THE
ATTENTION OF:
Sperry-Sun Drilling Services
Attn: Jim Galvin
6900 Arctic Blvd.
Anchorage, AJaska 99648
BP Exploration (Alaska) Inc,
Petro-technical Data Center LR2-1
900 E. Benson Blvd.
Anchorage, Alaska 99649-6612
Date:
~y {'
Sign~~--t ~~'--~
RECE\\JE.O
r "','"' (L~~2
.. .';' \ ...
. mmØ'{\
&Ga5CQt\S.ca
~-Q\\ M~-
~
GeoQuest
3940 Arctic Blvd
Anchorage. AK 99503
ATTN: Sherrie
MPS-15
MPE-02
Well
riO/-dt.J5
) ~5-/CjI
Job #
22132 SCMT
22122 RST-SIGMA
Log Description
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COpy EACH TO:
BP Exploration (Alasko) Inc.
Petrotectnical Data Center MB3-3
900 E. Benson Blvd
Anchoroge, Alosko 99519-6ö 12
Date Delivered:
RECEIVED
t.i .~:; '; Q O002
. ",, L , L
Alaska Oil & Gas Cons. CommiSSion
II. ...,.J..............
Date
03/06/02
03/02102
.3/27/2002
NO. 1936
Company Alaska Oil & Gas Cons Comm
Aftn: Lisa Weepie
333 West 7th Ave. Suite 100
Anchorage. AK 99501
Field:
Milne Point
CD
Color
2
Sepia
BL
Schlumberger GeoQuest
39L10 Arctic Blvcj
Anchorage. AK 99503
A TTI'J Sherrle
Received b'li~~ . I () P
~--_/ql./;;"'T\.- U._\J2.ç'~ ' .c"----"
Re: Pulling VSP on S-pad
Subject: Re: Pulling VSP on S-pad
Date: Tue, 19 Mar 2002 17:06:41 -0900
From: Tom Maunder <tom_maunder@admin.state.ak.us>
To: "Campbell, Steve K" <CampbeIS@BP.com>
CC: AOGCC North Slope Office <aogcc_prudhoe_bay@admin.state.ak.us>
Steve,
Thanks for the additional information regarding the VSP surveys. I had some
questions from the inspectors regarding the work. You had described the work in
the original permit to drill applications for the S pad wells. This message
gives further details regarding the operation. It is interesting that there are
individual BOP stacks on the wells. Regardless, the wells are still
unperforated and will remain so until4ES completes the wells. You have
approval to proceed with the operations as you describe. I will copy this
message and place it in the respective well files. You do not need to provide a
403 for the operations. Please call if you have any questions.
Tom Maunder, PE
AOGCC
"Campbell, Steve K" wrote:
~dO\ -dL\S
> Reference wells: MPS-15, 21, 31 & 9
>
> Tom,
>
> In the original permits for the above mentioned wells, I did not include the
> pulling of the VSP from the wells using the Klondike rig which will already
> be over one of the wells waiting on the completion of the surveys. After
> the surveys have been completed the plan is to have the Klondike rig pull
> the VSP from each of the wells leaving the well as it was when the drilling
> rig left it. Nabors 4es will be coming out to run the completions at a
> later date.
>
> Procedure for pulling the VSP's:
>
> 1. Run survey's
> 2. Move Klondike rig on to well
> 3. Pull VSP from the well
> 4. Install BPV
> 4. Close master valve and Nipple down the BOP's
> 5. Install tree cap and secure well
> 6. Move Klondike rig off
>
> Can you give me a verbal to do this work and we could send you a 10403 to
> follow it up for each well?
>
> Thanks for your consideration!
>
> Steve Campbell
> BP Drilling Engineer
> 907-564-4401 (0)
> 907-564-4441 (f)
> campbels@bp,com
1 of 2
3/20102 12:31 PM
Re: Pulling VSP on S-pad
----
i
Tom Maunder <tom maunder@admin.state.ak,us> I
Sr. Petroleum Engineer i
i Alaska Oil and Gas Conservation Commission !
----_._--
2 of 2
3/20/02 1231 PM
~
GeoQuest
3940 Arctic Blvd
Anchorage. AK 99503
ATTN: Sherrie
-~
Well
Job #
22087
22087
22087
22087
22087
22087
MPS-15
I.J? MPS-15
":> MPS-15
~ MPS-15
.() MPS-15
:0 MPS-15
Log Description
PEX AIT DSI (PDC)
PEX-R ESISTIVITY
PEX-NEUTRON/DENSITY
DSI
PEX & DSI TVD
SIDEWALL CORES
Date
01/24 &27/02
01/24 &27/02
01/24 &27/02
01/24 &27/02
01/24 &27/02
01/27/02
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO:
BP Exploration (AI(]SKCI) Inc.
Pefrotectnicol Doto Center MB3-3
900 E. Benson Blvd.
Anchorage. ,A,loska 99519-6612
Dote Delivered:
RECEIVED
t I ~:""! 0 :- 0002
'il"'\;"' .J L
AJaskaOil & Gas Cons. Comnùsion
Anchof8ge
3/4/2002
NO. 1864
Company Alaska Oil & Gas Cons Comm
Attn: Lisa Weepie
333 West 7th Ave, Suite 100
Anchorage, AK 99501
Field:
Milne Point
CD
1
Sepia
BL
Schlumberger GeoQuest
~~9~O Arctic Blvd
Anct'".)roge. AK 99503
ATïN' Sherrie
ReceiVedbY~~
Schlumberger
NO. 1820
Schlumberger Technology Corporation, by and through is Geoquest Division
3940 Arctic Blvd, Suite 300
Anchorage, AK 99503-5711
ATTN: Sherrie
02/19/02
Company: Alaska Oil & Gas Cons Comm
Attn: Lisa Weepie
333 West 7th Ave, Suite 100
Anchorage, AK 99501
Field:
Well Job # Log Description Date BL Sepia
I 'ð 7;"" 1l.:J 3 3H-15 INJECTION PROFILE 02/01/02 1 1
a. oO-I3CD 1 D-140 22066 RST-SIGMA 01106/02 1 1
dO\j- °3Þ 1 L-20A 22054 SCMT 01/28/02
..310 /-¡)t¡ r: 1 C-24 22055 USIT 01/20/02
1 C-24 22055 SSLT 01/20/02
,-9.0) -/31 2 P-415 21488 BEST DT-SONIC PROCESSING 11/24/01
2P-415 21488 ELAN GLOBAL SOLVER (TVD) 11/24/01
2P-415 21488 FRACADE ADVISOR MECH PROPERTIES (TVD) 11/24/01
aO}- 001 2P-417 21243 ELAN ELEMENTAL ANALYSIS 05/12/01
2P-417 21243 FRACADE ADVISOR MECH PROPERTIES 05/12/01
SIGN&-(J- ().Qep~
DATE:
Kuparuk
CD
Color
1
1
1
1
1
1
1
1
RECEIVED
FEB 1 9 2002
Please sign and return one copy of this transmittal to Sherrie at the above address or fax to (907) 561-8317. Thank you. AlaskaOiI&GasCons.Commission
Anchorage
5pe~~\I-5un
CR"IL-LING SERVIc:eS
A Halliburton Conlpany
January 30, 2002
dlJ l- ~yç-
To:
AOGCC
Attn: Howard Oakland
333 West 7th Avenue, Suite 100
Anchorage, AK 99501
F O~S
From: Sperry Sun Drilling Services
Attn: Bernie Leas
6900 Arctic Blvd.
Anchorage, AK 99518
Contents: Washed & Dried
From:
BP Exploration Alaska Inc.
MPS-15i
North Slope, Alaska
API # 50-029-23061-00
Shipment Includes:
Total Number Of Sample Boxes Included In This Shipment
3
Box NO.1: 110' to 1460' Box NO.2: 1460' to 3240' Box NO.3: 3240' to 4758'
I rocess Depth Start 110'
Process Depth End 4758' TO
Process Date Start 1-21-02
Process Date End
1-27 -02
RECEIVED BY:
I~;¡:m~ (ý
~~n Name
~~C~/~
, ¡:-Ce 0 ~D
Qt,~ ¡ ;00;
~,
DATE:
.\.: I\fPS-15i pennit(revl)
Subject: FW: MPS-15i permit (revl)
Date: Wed, 26 Dee 2001 12:28:34 -0600
From: "Campbell, Steve K" <CampbelS@BP.eom>
To: "\vinton_aubert@}admin.state.ak.us'" <winton - aubert(@admin.state.ak.us>
Steve Campbell
907-564-4401(0)
907-564-4441(f)
campbels@bp.com
Working to many wells at the same time.
not 10-3/4" Sorry for the confusion.
This one has 9-5/8" surface casing
> -----Original Message-----
> From: Campbell, Steve K
;;. Sent: Wednesday, December 26, 2L10l 9:20 .JiM
> To: 'winton_aubert@awnin.state.ak.us'
> Subject: NPS-15i permit
>
> As per Tom Maunders request for clarifications to the permit on NPS-15i:
>
> Cement yields:
> 9-5/8" surface casing: lead = 4.15 cuft/sz & tail = 1.15 cuft":s.Y.
> 7" production casing: tail = 1.15 cuft/sx
>
>
> Top of cement for the 7" production casing is planned at ]"-:'57' MD
>
>
> The 9-5/8" shoe test ¡Úll be (FIT to 10.0 ppg ENW)
>
> At the end of the well the 9-5/8"" x 7" annulus will be freeze
> protected by bu11heading diesel do¡.,m to the shoe of the 9-5,.'8"" casing.
>
> Note: Cutting samples tÚll also be caught as per lJ,.OGCC regulations as this
> is the first 1\7e11 on a neL~' pad.
>
> If you need any further information please call me today.
>
> Thanks for your help & have a great day!
>
>
> Ste\Te Campbell
> 907-564-4401(0)
> 907-564-4441 (f)
> campbels@bp.com
>
>
101' 1
11116.'01 9:.t1 A~1
~~]~E : F ~,~ffiu~~~:Æ
ALASKA. OIL AND GAS
CONSERVATION COMMISSION
TONY KNOWLES, GOVERNOR
333 W. -¡r>t AVENUE. SUITE 100
ANCHORAGE, ALASKA 99501-3539
PHONE (907) 279-1433
FAX (907) 276-7542
Pat Archey
Senior Drilling Engineer
BP Exploration (Alaska) Inc.
P.O. Box 196612
Anchorage, Alaska 99519-6612
Re:
Milne Point S-15i
BP Exploration (Alaska) Inc.
PeIlTIit No: 201-245
Sur. Loc. 3322" NSL, 136' WEL, SEC. 12, TI2N, RI0E, UM
Btmhole Loc. 4286' NSL, 205' WEL, SEC. 12, T12N, RIOE, UM
Dear Mr. Archey
Enclosed is the approved application for permit to drill the above referenced well.
The pennit to drill does not exempt you from obtaining additional permits required by law from other
governmental agencies, and does not authorize conducting drilling operations until all other required
permitting detenninations are made.
Annular disposal has not been requested as part of tbe Pennit to Drill application for Milne Point Unit S-
15i.
A full suite of fonnation evaluation logs, mud log, and formation samples are required from conductor
depth to TD.
The blowout prevention equipment (BOPE) must be tested in accordance with 20 AAC 25.035; and the
mechanical integrity (MI) of the injection wells must be demonstrated under 20 AAC 25.412 and 20 AAC
25.030(g)(3). Sufficient notice (approximately 24 hours) of the MI test before operation, and of the
BOPE test perfonned before drilling below the surface casing shoe, must be given so that a representative
of the Commission may witness the tests. Notice may be given by contacting the Commission petroleum
field inspector on the North Slope pager at 659-3607.
aniel T. Seamount, Jr.
Commissioner
BY ORDER OF THE C01\lMISSION
DATED this 26th day of December, 2001
jjc/Enclosures
cc:
Department of Fish & Game, Habitat Section \Vlo encl.
Department of Environmental Conservation w/o encl.
LenQth
80'
2548'
4653'
t \ð/0 \
- \#..J(,A I ¿.ll ~.
IN] t) ~ / "\ Water Injector
"'..:' "J /,</L
.Y
0 Exploratory Dßtratigraphic Test 0 Development Oil
II Service 0 Development Gas 6 Single zone)lb 0 Multiple Zone
5. Datum Elevation (DF or KB) 10. Field and Pool
Planned KBE = 68' Milne Point Unit / Schrader
6. Property Designation Bluff
ADL380109
7. Unit or Property Name
Milne Point Unit
8. Well Number
MPS-15i
9. Approximate spud date
January 1, 2002 Amount $200,000.00
14. Number of acres in property 15. Proposed depth (MD and TVD)
2560 4653' MD / 4428' TVD
17. Anticipated pressure {see 20 AAC 25.035 (e) (2)}
35 0 Maximum surface 1437 psig. At total depth (TVD) 4271' / 1865 psig
Setting Depth
T0D Aotom
MD TVD MD TVD
0' 0' 113' 113'
0' 0' 2548' 2482'
0' 0' 4653' 4428'
pN
ALASKA (
STATE OF ALASKA
)AND GAS CONSERVATION COMMI~
PERMIT TO DRILL
20 AAC 25.005
1 b. Type of well
1 a. Type of work II Drill 0 Redrill
0 Re-Entry 0 Deepen
2. Name of Operator
BP Exploration (Alaska) Inc.
3. Address
P.O. Box 196612, Anchorage, Alaska 99519-6612
4. Location of well at surface
3322' NSL, 136' WEL, SEC. 12, T12N, R10E, (As Proposed)
At top of productive interval
4286' NSL, 205' WEL, SEC. 12, T12N, R10E, UM
At total depth
4286' NSL, 205' WEL, SEC. 12, T12N, R10E, UM
12. Distance to nearest property line 13. Distance to nearest well
ADL380110, 205' MD No Close Approach
16. To be completed for deviated wells
Kick Off Depth 300' Maximum Hole Angle
18. Casin~ Program Specifications
Sl7e
CasinQ WeiQht Grade CouDlinQ
20" 92# H-40 Welded/Ins
9-5/8" 40# L-80 BTC
7" 26# L-80 BTC
11. Type Bond (See 20 AAC 25,025)
Number 2S100302630-277
Hole
42"
12-1/4"
8-1/2"
Quantitv of Cement
(include staQe data)
260 sx Arctic Set (Approx.)
481 sx Class 'L', 285 sx Class 'G'
157 sx Arctic Set I
19. To be completed for Redrill, Re-entry, and Deepen Operations.
Present well condition summary
Total depth: measured
true vertical
Effective depth: measured
true vertical
feet
feet
feet
feet
Junk (measured)
Plugs (measured)
Casing
Structural
Conductor
Surface
Intermediate
Production
Liner
Length
Size
Cemented
MD
TVD
RECEIVED
Perforation depth: measured
DEe 2 0 ZOOl
Alaska Oil & ~ashcon&. Commissior¡
'"Inc orage
true vertical
20. Attachments
II Filing Fee 0 Property Plat 0 BOP Sketch 0 Diverter Sketch II Drilling Program
II Drilling Fluid Program 0 Time vs Depth Plot 0 Refraction Analysis 0 Seabed Report 0 20 AAC 25.050 Requirements
Contact Engineer Name/Number: Steve Campbell, 564-4401
21. I hereby certify that th~f9regOi;J-.yrue landl/jr~t tll~e best of my ~nowl~~ge ,
Signed Pal Archey /;..æ:-~ (a~té£). I~/J.( ~ Title Senior Drilling Engineer
I Commission Use Only
Permit Number API Number. A..P~roval Date See cover letter
,2¿,1/---:2Y5" 50-¿)-¿~q" -2 .~¿&'I .-èC) lol,/~lc /0 J for other requirements
Conditions of Approval: Samples Required RYes 0 No Mud Lo Required ~~s 0 No
Hydrogen Sulfide Measures 0 Yes ~o Directional Survey ReqUired ~es 0 No
Required Working Pressure for BOPE D2K 0 3K D4K 0 5K 0 10K 0 15K 0 3.5K psi for CTU
I:lf.?yiJJther: ~ SOt) \>~, ~~-'tl;(.~~ '-.sl.~Q."-\ Q~\\\:"'I \..o~ ~~()~~ o.~~\.X.I \ .ço't"'~o~~~('\
by order of
Approved By ORIGINAL SIGNED BY .', ~o":mis~ione~. the commission Date I d Ir.~ lð I ~ J .
Form 10-401 Rev. 12-01-85 U I ay10r Seamount .( ~ i. ¡::,. ( ï 'I /\ i S~~lt In Tnpllcate
\ f ~ '~ï,: ,_I"
. - ',: \. -.' I I \;! \ å.-
Prepared By Name/Number: Sondra Stewman, 564-4750
Date Ii-II 9 Ie) I
Schrader Bluff S Pad Development MPS-15i Drilling Permit
1. Well Plan SUmmary
Well Name: MPS-15i
I Type of Well (producer or injector):
I Grassroots Water Injector
Suñace Location:
3322' FSL (1956' FNL), 136' FEL (5143' FWL), Sec 12, R10E, T12N
X=565873.9600 Y=5999990.6000
4286' FSL (992' FNL), 205' FEL (5073' FWL), Sec. 12, R10E, T12N
X=565796.0600 Y=6000954.01 00
Target (Bottom Hole
Location):
I AFE Number:
MD I 4653' I
I TVDrkb (TD) I 4428 I
I Rig: 1 Nabors 27E I
I Operating days to complete: 113 I
I KBE I 68 I
I
Max. Inc.
I 35 I
I Estimated Start Date: I January 2002 I
I Well Design (conventional, slim hole, etc.): 1 Conventional Grassroots Injector Well
Scope:
Drill an Injector Well to support the future Multi-Lateral Producers. This well is
designed for water injection initially into the Schrader Bluff OA and OB sands. Post rig ~
work includes: CBL and running VSP on 1-1/2" pipe. Completion will be permitted at 7'-
a later date.
2.0 Current Well Information
2.1 General
Well Name:
Well Type:
Current Status:
BHP:
BHT:
MPS-15i
Development - Schrader Bluff Water Injector
Waiting on Conductor to be set
1893 psi @ 4206' TVDss Schrader Bluff lOB' sand. Normal pressure gradient.
88°F @ 4400 TVDss Estimated (SOR)
2.2 Current Mechanical Condition
Conductor:
N/A
2.3 Target Estimates
Estimated Reserves: Injector to sweep: 1.0 Mstbo
Expected Initial Rate: Injection rate: 3000 bwpd
Expected 6 month avg: Injection rate: 2000 bwpd
Version #1, 12/17/01
Schrader Bluff S Pad Development MPS-15i Drilling Permit
3. Drillina Hazards and Continaencies
3.1. Well Control
MANDATORY WELL CONTROL DRILLS:
Drill
D1
D2
D3
D4
D5
Type
Tripping
Drilling
Diverter
Accumulator
Well Kill
Frequency
(1) per week, per crew
(1) per week, per crew
N/A
Prior to spud or RWO
Prior to drill out,
per crew
Comments
Conducted only inside casing.
Either in cased or open hole. DO NOT shut-in well in open hole.
N/A
Approx. every 30 days, thereafter at convenient times.
Prior to drill out the intermediate and production strings. Never
carry out this drill when open hole sections are exposed.
3.2. Lost Circulation
3.2.1. Lost circulation has not been encountered while drilling this interval on previous offset wells, but
has been seen during cement jobs. Make sure and condition the mud prior to running and
cementing casing. Be prepared to do a top job if required.
3.2.2. Follow the LOST CIRCULATION DECISION MATRIX in the well plan if fluid losses occur while
drilling. Break circulation slowly in all instances and get up to recommended circulating rate slowly
prior to cementing.
3.3. Unexpected High Pressures
3.3.1. It is unlikely there will be unexpected overpressure when drilling to the Schrader Bluff formation.
Reservoir pressure is expected to be 1893 psi (8.65 Ib/gal). In this well, the Schrader Bluff
formation will be drilled with 9.1 ppg mud. This well we be drilled in the undrained portion of the
MPH-08 fault block. Offset injectors that have above normal shut-in pressures will be shut-in prior
to drilling this well. Some of the wells on H-pad have experienced sever gas cut mud well below
the permafrost. Have gas detector installed prior to drilling on S-pad.
3.4. Stuck Pipe
3.4.1. Good drilling practices to avoid differential sticking are required. Minimum mud weights and proper
mud properties as outlined in the MI mud program must be closely followed.
3.4.2. Stuck Pipe: Go immediately to SURE manual, determine stuck pipe mechanism, follow
recommendations in the SURE manual. DO NOT JAR UP if packed-off!
3.5. Pad Data Sheet
3.5.1. Please Read the S-Pad (based on offset wells drilled in same fault block) Data Sheet thoroughly.
3.6. Hydrates
3.6.1. Have been seen in offset wells and is likely on this well. Follow RP for controlling Hydrates.
3.7. Breathing
3.7.1. No breathing problems are expected drilling the Ugnu or the Schrader Bluff formations.
2
Schrader Bluff S Pad Development MPS-15i Drilling Permit
3.8. Hydrocarbons
3.8.1. Hydrocarbons will be encountered in the Ugnu and Schrader Bluff intervals. Free gas maybe
encountered below the upper Ugnu.
Hydrogen Sulfide
3.8.2. MPS Pad is not designated as an H2S Pad.
Drillina Proaram Overview
4.1. Surface and Anti-Collision Issues
Surface Shut-in Wells: No wells need to be shut-in for the rig move on and off
Close Approach Wells: There are no close approach wells
Well Name
Current
Status
N/A
Production
Priority
N/A
N/A
4.2. Well Control
Surface hole
Expected BHP
983 psi @ 2200' TVD
( estimated)
Max Exp Surface Pressure
763 psi
(0.1 psi/ft gas gradient)
Production hole
Expected BHP
1865 psi @ 4271' TVD
(estimated)
Max Exp Surface Pressure
1437 psi
(0.1 psi/ft gas gradient)
4.3. Mud Program
12-1/4" Surface Hole Mud Properties:
Density (ppg) Funnel vis YP
8.6 - 9.6 100 -150 25 - 40
HTHP
N/A
8-1/2" Production Hole Mud Properties:
Density (ppg) Funnel vis YP
8.6 - 9.6 50 - 150 25 - 40
HTHP
N/A
Precautions
N/A
BOPE Rating
21-1/4" 2000 psi WP
Diverter
Planned BOPE Test Pres.
*Function test only
BOPE Rating
13-5/8" 5000 psi WP
Planned BOPE Test Pres.
Annular and Rams
250 psi low & 2500 psi high
Spud - LSND Freshwater Mud
pH API Filtrate LG Solids
9.0 - 9.5 N/A N/A
LSND Freshwater Mud
pH API Filtrate LG Solids
9.0 - 9.5 < 6 < 6.5
3
Schrader Bluff S Pad Development MPS-15i Drilling Permit
LCM Restrictions: N/A "",'-"
Waste Disposal: NO ANNULAR INJECTION. Drill Cuttings taken to DS-4 disposal site
Call the Pad 4 waste disposal site prior to truck leaving location so the site can be ready to unload
waste. Exempt liquid wastes can be taken to DS-4 or Phillips KRU 1 R.
4.4. Formation Markers
Formation Tops ft MD ft TVDss Pore psi EMW (ppg)
Base Permafrost 1818 1750 -~\J~C ((
SV1
Top Ugnu 3750 3456 1555 8.65
Top Ugnu M 4153 3857 1736 8.65
NA 4263 3967 1785 8.65
NB 4290 3994 1797 8.65
NC ABS ABS ABS ABS
NE 4342 4046 1821 8.65
NF 4386 4090 1840 8.65 - ,,~,,~ \-~~~
Top OA 4416 4120 1854 8.65
Base OA 4453 4157 1871 8.65
Top OB 4484 4188 1885 8.65
Base OB 4502 4206 1893 8.65
4.5. CasinglTubing Program
Hole Size
WtlFt Grade
Conn. Length
Csgl
Tbg O.D.
42" 20" 92# H-40
12 % " 9-5/8" 40# L -80
8 %" 7" 26# L-80
Note that the 20" conductor will be insulated
Welded
BTC
BTC
80'
2548'
4653'
Top
MD I TVDrkb
0'
0'
0'
Bottom
M D I TVDrkb
113' 1 113'
2548' 1 2482'
4653' 1 4428'
4.6. Cement Calculations
Casin~ Size I 9-5/8" 40 Ib/ft L-80 BTC Surface casing
Basisl 2500/0 excess over gauge hole in permafrost interval, 40% excess over gauge hole below permafrost
Total Cement Volume:
Wash
Spacer
Lead
Tail
Temp
50 bbl of Newtonian Chemical Wash (CW100) weighted to 8.32 ppg
75 bbl of Viscosified Spacer (Mudpush XL Design) weighted to 10.50 ppg
481 sxsl10.7lb/gal Class L Lli5 {1t 5/~iL
285 sxs115.8 Ib/gal Class C I I S ~ ~I ~ ~
. ,
I BHST == 80° F from SOR, BHCT 85° F estimated by Halliburton
Casin~ Size I 7" 26 Ib/ft L -80 BTC Production casing
Basisl 40% excess over gauge hole below permafrost
Total Cement Volume:
Wash
Spacer
Lead
Tail
Temp
50 bbl of Newtonian Chemical Wash (CW 1 00) weighted to 8.32 ppg
75 bbl of Viscosified Spacer (Mudpush XL Design) weighted to 10.50 ppg
157 sxs 15.8lb/gal Class G Arctic Set I t./: D~Y,-,Þ-
I BHST == 80° F from SOR, BHCT 85° F estimated by Halliburton
T (, C -=- r 1.:: 1 I
. J -'.
4
Schrader Bluff S Pad Development MPS-15i Drilling Permit
4.7. Survey and Logging Program
Hole Section:
Open Hole: Surface: MWD/DIRlGR & Wireline logs (Platform express/Dipole Sonic
Production: MWD/DIRlGR & Wireline logs (Platform express/Dipole Sonic/SWC
Cased Hole: CBl (post rig)
4.8. Bit Recommendations
BHA Hole Size
Number and Section
1 12-1/4"
2 8-1/2"
Depths (MD)
Bit Type
Nozzles
Max.
K-Revs
Hours
0' - 2300'
2300' - 4653
MXC-1
MXC-1
TBD
3-13' & 1-10
5. MPS-15 Nabors 27E Operations Summary
5.1. Pre-Rig Operations
1. Check conductor level for correct spool spacing for rig flowline.
2. Check out pad and road for proper rig clearance.
5.2. Procedure
3. MIRU Nabors 27E, NU diverter on 20'1 conductor, PU 5" drill pipe
4. MU kickoff assembly with 12-1/4" MXC-1, MWD/GR.
5. Drill 12-1/4" to kickoff point at 300' and start building angle to end of build at 2548' MD, 2481'
TVD/RKB.
6. CCM and perform a conditioning trip. POOH for open hole logs
7. Perform wireline logs as required (Platform Express/Dipole Sonic)
8. Run 9-5/8" 40# L-80 BTC, CCM for cement job
9. Mix and pump cement as per the Cement plan.
10. NO 21-1/4" diverter and nipple up 20" X 11" Gen 5 wellhead and test .ß
11. NU BOP's and test annular to 250 psi low and 2500 psi high, test ram to 250 psi low an~o psi
high
12. P~-1/2" bit and directional assembly (MWD/GR) and run in hole to top of cement. Test casing to
4500 psi. Drill out float equipment and 25' of new formation. Circulate out any cement-contaminated
mì1d. L O-CI{" ,./
13. Perform a lea~st. Expected LOT = 10.0 ppg
14. Drill 8-1/2" hole to start of drop at 3200' MD, 3017' TVD/RKB. Start dropping 3.3°/100' to until
vertical at 4116' MD, 3892' TVD/RKB.
15. Continue drilling 8-1/2" hole to a total depth of 4652' MD, 4428' TVD/RKB. POOH
16. Perform wireline logs as required (Platform Express/Dipole Sonic/60 SWC)
17. Perform conditioning trip. POOH with DP and lay down BHA .
18. Rig up and run 7" 26# L-80 BTC casing to TO, CCM for cement job.
19. Mix and pump ce,.rnent as per theBment plan. Bump the plua usina 60/40 KCUMethanol for
¡freeze protect..J Test casing to \,510 psi1 --
~~: ~~t~~~'~~ 7-1/~ 5M drilling spooi & 7-1/16" 5M gate valve.
\
'V
Nk;' 1/ [ If ttt -Þ-v ~ ~:-- ::. L .
fL-ý Ç,. (c¡.<, 'I)L~!t {¿~~ (¿.
5
Schrader Bluff S Pad Development MPS-15i Drilling Permit
4- ft.( S (.v" "t~i:.."~ { i Lf l.l...
22. Test wellhead equipment to þ,500 psi
23. Install back pressure valve
24. RD/MO
5.3. Post Rig Work
1.
2.
3.
Perform CBL log
Move in Klondike #1 work platform
NU 7-1/16" 5M BOP stack and test blind/shear rams 250 psi low; 4,000 psi high and test the annular
to 250 psi low and 1,000 psi high.
Pull BPV
Rig up and run 1-1/2", 2.4ppf, N-80, 10 rd EUE, with Seismic cable and Geophones strapped to the
outside of the tubing to TO.
Land tubing in split bowl on top of the annular.
Install valve in top of 1-1/2" tubing and test same with nitrogen to 90 psi
RD Klondike and support equipment and move off
4.
5.
6.
7.
8.
6
BP EXPLORATION
Milne Point Unit MPS-15i
Field: Milne Point
Well: S-1Si
Actual Surface Location: 4286' FSL, 205' FEL
Bottom Hole Location: 3322 FSL, 136' FEL
Status: New Development
DIRECTIONAL
LWD
DEPTH
MD I TVD
HOLE
SIZE
OPEN HOLE
LOGGING
FORM
NONE
;~i
110' ';,1
":.~.i~,
:':1
:~;I\::¡~
1,815' :X;j~
'I',' ~~~ I.II.~
~t\it
2.482' :'j~~$:
--
: ~;~(~~~ !
~;~
~;f;:
.~~.
:;:{);:
ii~,: ,:~::'
':{(''"
~!\::. ':~,:II
,I,:~ ,I :'~I'
~~,
12-114"
NONE
110'
Base of Permafrost
1,824'
MWDIDIRlGR
PEX-Sonic
Dipole Sonic
2,548'
Top of Tail Cement ç9 :""
:)
Top of N sand 4,257' 4,032' ' .
MWDIDIRlGR PEX-Somc
Dipole Some :
60 SWC's
..
, .
OA sand 4.416' 4,192'
OB sand 4.484' 4,260'
,~
TD 4,653' 4,428' "
12/1812001
:t
...
,..,
CASING
SPECS
42"
20" 92#, H
40 Welded
Surface
Casing
9 5/8" 40#
L-80
BTC
8-112"
Production
Casing
ì' 26#
L-80
BTC
RaUl
.'~..8U.G&MÆUS
ENG: Steve Campbell
RIG: Nabors 27E
MSL: 34.5
RKB: 68
MUD INFO
PIT INFO
MW=9.1 ppg
MW = 9.2 ppg
INFORMATION
Wellhead
FMC Gen 5 20" x 11" 5M
Cameron 3-1/8" tree
KOP @ 300'
AA=8
EOB@1750' MD
1742' TVD
SB @ 2015' MD
2000' TVD
EOB @ 2548'
2482' TVD
AA=35
SOD @ 3046' MD
2888 'TVD
Vertical @ 4117' MD
3892' TVD
MPS-151 well plan schematJc2.xls
ö
"-'MI'......... 1M ,...",
Ell' ",n....
('II.."LaI""1 MrUul ~nrftll'l'l ( \8''''11\11\'
rnl" S>*," I''-W'"
~n McduJ 1n.. I )1"\"1 N."C1b
l m... ~~... 111..~1. CIb."
~'.m,~ 1.1«"'" RuIM rw..1
0
be
R! 11 R!:NIT INH>R.M.... IllIN
(,....""'08" IN [I Ror........ Wotl Cc:n<re "lID MI~ I'. lrue "'-.....
VatIaIlln'll¡ Ror......,. S.r..J u.. 72 ,,,
So.looQIVSIRor.r...... S",". IUI1!INOIJI>[,
M....,re.I ['<<II rulenn. S.Pod Dr> 72 ".
(.....IIIIITI Mett..d MnrroItlCID'\'8t1ft
All TVD depths are
ssTVD plus 72' for RKBE.
SIan Dlr 11100' .H\O' MD. 300TVD
....-
- :
~OO.
700
, 00
1000'
: S1 art þ1f 21100' 1200' MD. 1199 WTVD
~--
- I
I
1400 ,8° ,
,I SOl,
¡¡od D,r 17~0' MD. 1742.71' TVD
~
it:
8
~ 2100
~
~ i
Ë
> I
2
I- ¡
2800
.~~OO
42no
- .
HIRY[, "RI (,RAI.4
["'tOI>lm Do.'J"I'I.' S~1"",
nfl'
t!.lllr.1
1"",1
"-tIIU) rLlrn:d M~$" Wp1\ VI
""H~ 1'!lmeJ.I.4I'S-I' INr'" VI
rnJJY}l!I"'"~
MWIJ.IIT<.M<
Nun<
.N'.~
"'''''''111'
~I"" MI'~ I~ W!",1 11'1.., MI'~.I<I'I"" Mf'~ I~I
Cr",,',.,j Rt t..... 1\11""
[).'< 1 ]'4 '111111
.E.1W
F"I.l[¡MJ"S-11;
It, 7'1 -47'.1 '~I;
'\~.lHI
l hn.k('d
U.slê'
Nom.
f"'ll
.N.S
Rt'Ut\!.o¡;d
[)dlt" --- - -
Mf"$ II; II 41112'1"1
W-4I(
SECTION DETAILS
"IW41
\1-"," "Hi 'II, h.omr
--- ----- - ---
WUI rlf'AIL~
''''on¡¡
L.øll!u<k
I "'fIic1W.\: ~....
V,"g7\..."
7(J24,74~J04 14'-I"274,1('7("w
N.A
¡ ...R(,[ I [III"'["
.[..W
""'''1' 'I"'J'C
No"""''''
See MD Inc Azi TVD tN/-S tE'.l.W Dleg T Face VSec Targ~1
I 72.00 0.00 355.88 7200 o.on 000 0.00 0.00 0.00
2 300.00 00(1 0.00 300.00 0.00 000 o.no 0.00 0.00
3 60000 3.00 16~ 00 599.86 .7.~8 2.03 100 165.00 .7.71
4 90ll.00 0.00 0.00 89Q. 7 3 -15 17 4.06 Ion 1t<000 .1 ~ 42
5 1200.(10 3.00 355.71 1199.59 -734 3.48 1.00 3~5.71 - 7.57
6 1750 (10 14.00 .~55.71 1742.71 n-óO .2 ~9 2.00 0.00 7.\.flO
7 2015.16 1400 355.71 2000.00 r .n.57 -739 o.on 0.00 137.75
'\ S"f ~ --,. 8 2548.4\ 3~..~3 355.7\ 2481.80 358.20 -23.Q5 4.00 0.00 358.Q9
9 3046.2(1 3~.33 35571 2887.96 645.29 -45.48 0.00 0.00 646.89
10 4116.86 0.00 -'5~.71 3892.00 964.15 -b9.41 3.30 180.00 9M.b4
II 44liJ.8b 0.00 355.71 419200 964.15 .69.41 0.00 000 96b.b4 MPS.\5TI
12 4502.86 0.00 355.71 4278.00 964.15 -(1941 000 355.71 96b ó4
13 4652.8(1 0.00 355.71 4428 00 964.15 -(1<141 0.00 3~5.71 %664
CASING DE1,b,llS
No. TVD MD Name Size
4427.9<1 4t1~2.8 ~ 7" 7000
':. ~ "
2015.16' MD, 2000'TVD
EhdD,r :H4f<.41'MD,24818'TVD
...............~-
0
i -- r-;
i I
::>Ian J,r .1..~1[l1I': 304b 26' MD. 2887.96'TVD
i _I
1
I
l-
I
¡
r -
I
J ;---~--
\ ! i
, ::, liøp-1..~U
!- ~o ¡ -J' - -
,. , Schrader N,b,
: J- E~d- Di 1- : 4116.86' MD, 3892' ~~'I?.-- -_: Schrader NB
4000 J ' .- -' - --- Schrader NC
¿n" "{op lIpIU M---- ---:.:=-~:==----~ Schrader NE
I r - I - -- .t-:c-:-- - :::---- ---- Schrader NF
I --~t::::=-:::::.--=====--= TSBD-OA
-.~~.l-~ -====-- - TSBC(ba.c:eOA)
. --- ~ - TSBB-OB
: :- SBA~ (bJ!>e OBI
4500, I '
-L T -' --
.U ' :
7" , -:- T'ural Depth : 4(1~2 8(1' MD. 442!' TVD
700
I
14[10
I
2100
Venlcal Sec,,,,n at .I~~ BB" 700A.lm
:~ :
0
(fJ
IrI
II
I
{I
I'
I
I
I
I
, i
~\
/..5'00
/000
4'
$00 ~
'..5"00
FORMATION TOP DETAJLS
Nl1 T VDPalh MDPalh Forma[lon
.1~28 00 37~0.14 T lIP Ugnu
.W29.00 41 53.86 Top Ugnu M
.~ 4039.00 4263.86 Schrader N.<\
4 4066.00 4290.86 Schrader NB
~ 4102 00 4326.86 Schrader NC
6 4118.00 4342.86 Schrader NE
7 4162.00 4386.86 Schrader N F
8 4192 00 4416.86 TSBD-OA
q 4229.00 4453.8b TSBC (bØ!>e OM
10 4260.00 4484.86 TSBB-OB
II 4278.00 4502.86 SBA5 (b.1.c:e OBI
d
1000
c
~
~ 600
¡-
::;:
t:
c:.
~
..c
:;
0
!J)
400
(MI''''''''''I~ I^II'
kf 11 RI loin INfORM... I !'IN
~IIR,'l \' (.¡,. '.."AM
PI...-, 1'.1"<; I\Wr"\II'I.",MI'S 1\/I'I3ßMP~ 1\,
I,~.r
rH" 1\"",..
("'-I"dIlJolICI""FIR~(...R:Ð.~ w~nf~ rIat.M~I(.lna-Nllrrb
V"""",JV\), Ror......, s-rld [I.. 72 UI>
~h.1Q .VSI Rtftrerce' S¡''II. (0 (fiN (l'lt"l( I
M<&.<U.-.d IJorlh Ro"""".. S-r.I Dr> 72 ,.,
r."""\ILlI..~ MC'b-1 "hŒn.I.m,~w\"bJn;
., (J.
~1"lr"'l
U~'f'ltl IITI LJr."J'II11.... SI.D"\\") rL...r,
It..lt" --
i u..ulal.... MIL'tJ'u1 Mn..rrurr, ( u.r'\lrun:
::c:: ~ ~~~V;:~~ ~.ul
rm. Surfa.." .III~I l bd'(I
W.m,~ "'ctI,.1 R".....lIaxot
~5% cenf.
, . <~:O-:'-'--
, MP6 15 \VpO~ T olal )eplh : 4f)~2 86' MD, 4428' T VD
" I 4000 TT JJlPS-1 5 T , II..
.'500 End Dlr . 411686'MD, 3892'TVD
-..
80{l
3000
- Sran Dlr:l 31100" 304fi 26' MD. 288796'1 \'D
2500
I
- End Dir . 2~~8 41' ~1Q, ?481.8' TVD
200
2{tOO - Sian Olr 41100' 2015 ¡"(þ' MD, 2000TVD
- End D1I1750' MD, 1M2 71' TVD
0
1500
500 . Sian Dir .I(){I' : .'O{l' MD. 300TVD
lono ~ ~drt U,I ¿IUll": ILlllI"MO. 1/99 5Q'TVD
.200
0
200
WeSI(-)IEa~I(+ (200Mn
CASING DETAJLS
No. TVD
MD
Namr
4427.99 465285 7"
FORMATION TOP DETAILS
No. TVDPalh MDPalh FOnTI31ion
I 3528.00 3750.14 Top Ugnu
2 3929.00 4153.86 Top Ugnu M
3 4039.00 4263.86 Schrader NA
4 4066.00 4290.86 Sthrader NB
5 4102.00 4326.86 Schrader NC
6 4118.00 4342.86 Schrader NE
7 4162.00 4386.Sb Schrader Nf
8 4192.0{l 4416.86 TSBD-OA
9 4229.00 4453.86 TSBC (ba..<.e OA I
10 426£1.00 4484.86 TSBB-OB
II 4278.00 4502 86 SBA5 (ba.<.e OB)
I "rc.JlñJ Uy ¡";'c,YI A..IIð1
nodi.: I 2-'4 '~IIIII
f(.lfllll Pk.fDe\1 ~r~l( "('ill VI
4"')~" l'l.me.I ~I~I' "'1"'1 \'1
r1u.YRfJ ~s
MWII 11".1-1-'
[).tl('
I h" ~,-J
RC'\lnlq,.-\.I
wnl LWT¡\..II~
Size
N,lnr 'I'<.S '¡:.W 1IIo_"!' L4<11I11 Lallru.k L~u!Jr.1r Sk.
f'br.MKI' If.'1!l -4'IIf4. C,yyiNlf} HI 1iI.(kJ"If. 1tr-].P74'4N 1~1I"]74X",7r.w 1'<."
I",kr.¡ 111[1^IL;.
Now- TV[I -N., [, v.' N.y'U.rr'F l.a..oJr1p ~h.'r"Iõ
~H'S I'll JI(ø} '.11 Qf'.4I' .J.'J-II ",..,.,,,...,.. \r.li.1w. [Jr, C.I".l rlY-.t.1.Oo I 'II
SE.CTION DE-TAILS
5..., MD Inc ð,zi TVD +NI.S +E.J-W DLeg T Face VSec
, 1200 0.110 355.88 72.£10 (i fin 00[1 (I £In 00[1 (100
2 .'on.nll (100 0 no 30n.oo n.oo 000 0.00 0.00 {Ion
3 (,(IO{l(¡ Ulll 165.00 549.86 -7.58 2 OJ 100 16500 -771
4 4(¡no(¡ 000 0.00 84Q" .15.17 4 11(. 1.00 180.£10 .15.42
5 1200 £Ill 3.£10 .'55.71 1199.54 . 7 .'4 'AX 1.00 .'55.71 - 7.57
6 17500£1 14 llO 355.71 1742.71 B.W .254 2 no 0.00 73 60
7 2015 If> 14.00 355.71 2000.00 1J7.57 .7.YJ 0.00 0.00 IJ 7.75
8 2548 41 .'5.33 35571 2481.8(¡ .'582£1 .1.' 45 4.00 £I 00 358 99
9 304b 2ó 3533 355.71 2iC87.Q6 645.2'1 -45.48 0.00 0.00 b4ó.8Q
10 411b 86 000 355.71 .'892.00 904.15 -69.41 .UO I Rn.OIl 9f>b.M
II 4416.86 000 355.71 4192 00 Q04.15 -ó9.41 0.00 o.on 966.64
12 45f12 86 0.00 355.7\ 427800 964.15 -69.41 0.00 35571 9bb 64
IJ 4652 86 000 35571 4428.00 9(>4.15 -69.41 0.00 355.71 966 64
MPS-15TI
7.000
T argc:1
/"
./
"
.,/
/
/
/
//
/
:,A
0
#
,rI
,ifIJ
I'
{I
I . ø /'
ÂJ ,// //
1"1 /./ '/-/"
/ /.7
/ ç
I /. //.
~ /
I
\: '
:-~
All TVD depths are
ssTVD plus 72' for RKBE.
I
40£1
).2Q
/ Vo
/ <5'/'>
/ /. </0
/ /a
// Vo
.,/" .5'00 ~~
~ /0
~ /
.s§? '$a
~- v
/
/
~
BP Amoco
Planning Report - Geographic
,.-.-.----..-- ---'-----------
.- ---------.-----"-
-- ------ --- -----.--
i Company: BP Amoco
; Field: Milne Point
'I Site: M Pt S Pad Working
Well: Plan MPS-15
I, ~e!I~I!!~~-!~n ~~~;.~5,c._:: -'.
Date: 12/4/2001 Time: 09:52:01 Page:
Co-ordlnate(NE) Reference: Well: Plan MPS-15, True North
Vertical (TV D) Reference: S-Pad Dev 72.0
Section (VS) Reference: Well (0.00N,O.00E,355.88Azi)
Plan: MPS-15 Wp03
. -.-- '---_-.-_0_..__.-.- ---- -. - .0_- -----------"-------- -.--- --- - -" - --- ..- -.--..-.. .".-
. - ... . -- - '----'-"---'---'--.'" ----.-..------...- --
Milne Point
North Slope
UNITED STATES
: Map Slstem:US State Plane Coordinate System 1927
I Goo Datum: NAD27 (Clarke 1866)
: S)'S Datum: ~.~an_~~~. Level
Field:
Map Zone:
Coordinate System:
Geomagnetic Model:
Alaska, Zone 4
Well Centre
BGGM2001
--
-. - - - --
¡ Site:
M Pt S Pad Working
Site Position:
From: Map
Position Uncertaint)':
Ground Le\ el:
Northing: 5999978.00 ft latitude:
Easting: 566345.00 ft Longitude:
North Reference:
Grid COD\'ergence:
.-.--- ---..- . ..- - - ---- .----.----.., ---.---- --.._-- - --.. -.- --- ---.. ---
0.00 ft
0.00 ft
70 24 37.329 N
149 27 35.171 W
True
0.51 deg
--._-_.-- --.. -- -_.
-. -..-. - -- --
..--- -.-. ---.
. -- --.- - .
_.~ ..-. ..-- -- - --.-. --
--.--- --.------_._---_.-. ---.-- ---- -.
-. - - -. - '-' -" - - - --
¡ Well:
Plan MPS-15
Slot Name:
I
I Surface Position:
I
I
I
+N/-S 16.79 ft Northing: 5999990.60 ft
+E/-W -470.95 ft Easting: 565873.96 ft
Position lIncertalnt)': 0.00 ft
Reference Point: +N/-S 16.79 ft Northing: 5999990.60 ft
+E/-W -470.95 ft Easting: 565873.96 ft
Measured Depth: 72.00 ft
Vertical Depth: 72.00 ft
Latitude:
Longitude:
70 24 37.494 N
149 27 48.975 W
70 24 37.494 N
149 27 48.975 W
0.00 deg
0.00 deg ,
---.----- -_. ---- -. -- -- - - -
Latitude:
Longitude:
Inclination:
Azimuth:
- - - -.- --- _._-. - - - - '-
.-_. --.-..- --.------.----- --.
-- -- ---- -.--------
!- "'~lIpath~ -PI~~ MPŠ~15- - - --.
. -- ----- - - -'~--
- -. - .- --- -- -..-.-------
--------- ---- - _.
.- --- -- -.-
Drilled From: Well Ref. Point
Tie-on Depth: 0.00 ft
! Current Datum: S-Pad Dev Height 72.00 ft Abo\'e S)'stem Datum: Mean Sea Level
: Magnetic Data: 6/29/2001 Declination: 26.28 deg
I Field Strength: 57460 nT Mag Dip Angle: 80.78 deg
I Vertical Section: Depth From (T\'D) +N/-S +E/-W Direction ,
I ft ft ft deg ¡
l-.-,"-- - :--:-~-~.--- ~-~~-=-~.--Õ.~~~ --~--~--.~ ~~-.:_-~~ßO-.~---- -~----O~O.~~----'--~__-35i88 ------=--=--.~=~=~-~: =.1
i--PI~~~" __-_n -MPS--15 Wp03 -. ----------- -------- -[);te Coo~posed: 12/4/200"---------
I Version: 1
i _~r~~d~~_~~S- ----------------------.- ---, - ~~~d~~~__. __~rom: Definitive Path ------- h_- _____.1
Plan Section Information
I ------- -==~]
!\ID Incl Azlm TVD +N/-S +E/-W DLS Build Turn TFO Target
ft deg deg ft ft ft deg/10OO deg/100ft deg/10OO deg
-_..------ --- --
72.00 0.00 355.88 72.00 0.00 0,00 0,00 0.00 0.00 0.00 I
300.00 0.00 0.00 300.00 0.00 0.00 0.00 0.00 0.00 0.00 i
600.00 3.00 165.00 599.86 -7.58 2.03 1,00 1.00 0.00 165.00
900.00 0.00 0.00 899.73 -15.17 4.06 1.00 -1.00 -55.00 180.00
1200.00 3,00 355.71 1199.59 -7.34 3.48 1.00 1.00 0.00 355.71
~ 1750.00 14.00 355.71 1742.71 73.60 -2.59 2.00 2.00 0.00 0.00
i 2015.16 14.00 355.71 2000.00 137.57 -7.39 0.00 0.00 0.00 0.00
2548.41 35.33 355.71 2481.80 358.20 -23.95 4.00 4.00 0.00 0.00
3046.26 35.33 355.71 2887.96 645.29 -45.48 0.00 0.00 0.00 0.00
4116.86 0.00 355.71 3892,00 964.15 -69.41 3.30 -3.30 0.00 180.00
I 4416.86 0.00 355.71 4192.00 964.15 -69.41 0.00 0.00 0.00 0.00 MPS-15 T1
4502.86 0.00 355.71 4278.00 964.15 -69.41 0.00 0.00 0.00 355.71
4652.86 0.00 355.71 4428.00 964.15 -69.41 0.00 0.00 0.00 355.71
._----_.- .. - ---- ----. .-- - --.- - - -- - - -. --- - ---. -.. --- -- - -.-.-- - -- - - -- -- .--
Section 1: Start
-- ---- --------------------- ----~----
-----
. -----------
MD Incl Azim TVD
ft deg deg ft
-- -- - -' '-'- ------------'--0_-
72.00 0.00 355.88 72.00
100.00 0.00 0.00 100.00
200.00 0.00 0.00 200.00
300.00 0.00 0.00 300.00
+N/-S
ft
0.00
0.00
0.00
0.00
+EI-W \'S DLS Build Turn TFO
ft ft deg/100ft deg/100ft degl1000 deg
--------_.------------- ----------------------- -
0.00 000 0.00 0 00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00
000 0.00 0.00 0.00 0.00 0.00
-- ---- ----
-- ------...---.
BP Amoco
Planning Report - Geographic
- . ---- .._- -- _.._._-~. - - --4_--'-_- ---
. -- -. .--- - -- --~ -.- -"'--..-
Company: BP Amoco
Field: Milne Point
Site: M Pt S Pad Working
Well: Plan MPS-15
Wellpath: Plan MPS-15
. "-- ----~.._----_.~_._-_...---~ -
~_.._._- ------- ---.. - --.. ---
Date: 12/4/2001 Time: 09:52:01 Page:
Co-ordinate(NE) Reference: Well: Plan MPS-15. True North
Vertical (TVD) Reference: S-Pad Dev 72.0
Section (VS) Reference: Well (O,OON,0.00E.355.88Azi)
Plan: MPS-15 Wp03
.. -. --.. .--- .__..~-- ----. --- --- ..
.. -- ..-----.----------- --------.. --- ---__0-' --_...--_.-- '-..
Section 2: Start
- --.. ---..-------.. --- ._- . ------.-- - .----. ..---.----. .-- -----
2
+N/-S
ft
---- .--...- .-_..
-0,84
-3,37
-7.58
VS----.--DLS--B~d-- Tur-~-----TFO---- ------- ---I
ft deg/1000 deg/100ft deg/1000 deg I
'-. ,--- ,------------ - ----.- . - ----.--- ------.- --_.- --- --_J
-0.86 1,00 1.00 0,00 0,00
-3.43 1,00 1.00 0.00 0.00
-7,71 1,00 1.00 0,00 0,00
1\10 Incl
ft deg
. '--0- -.- . - - .-_.
400 00 1.00
500.00 2,00
600.00 3,00
Azim
deg
165.00
165.00
165,00
TVD
ft
. --_. -- --
399,99
499.96
599.86
+E/-W
ft
. - - ----
0,23
0,90
2,03
-- - ---
. ... . -- ----'- ----
Section 3: Start
---- -l\ïD--.----i;~I-. --- -Ãzim ----. .-T\'D----+Ñi~Š---- - +E/~"'- .-.- VS--OLS Build -'¡'ur~--TFO------- - - ----I
ft deg deg ft ft ft ft deg/100ft deg/1000 deg/1000 deg I
-_.-- ----.---.- -- ---------------.--.----------------------------- -. --- ----.--1
700,00 2.00 165,00 699,76 -11.79 3,16 -11,99 1,00 -1.00 0,00 180,00
800.00 1,00 165,00 799,73 -14,32 3,84 -14.56 1,00 -1,00 0,00 180.00
900.00 0.00 0.00 899,73 -15.17 4,06 -15.42 1,00 -1.00 0,00 -180.00
._---.. ---- ..----
.-- -- --.- ----.- -.---------..--------.
.. - - - --- .----.-----.--------.---------.----..----. -- -.------
Section 4: Start
l=-~~()=~;~-~---;:~~--=-T~D-~N~S _+it~~--'i ----';~~:00f\ :;:I~OOll~~- ~~--===]
'1000.00 1.00 355.71 999,72 -14.30 3,99 -14.55 1,00 1,00 0,00 0,00
'1100.00 2,00 355.71 1099,69 -11,69 3,80 -11,93 1.00 1,00 0,00 0.00
: 1200,00 3,00 355,71 1199.59 -7,34 3.48 -7.57 1.00 1,00 0,00 0,00
- --.-. -----.
..--- --.
-. --. -- - - - -_. --- --. .------
-.- - -------.. - -- -
-- .-.-------w--- ------------------.. - -- --- -.--.- - -- -
Section 5: Start
---. --------- ---.-----.. -------.--- ------.----
MD Incl Azim T\'D +N/-S +E/-W \'S
ft deg deg ft ft ft ft
1____._- --- --.---- - .- ---.. -- -- ---- ------.---- -----._-
1300,00 5.00 355.71 1299,34 -0,38 2.96 -0,60
: 1400.00 7,00 355.71 1398,79 10,04 2,18 9.86
I 1500,00 9.00 355.71 1497,81 23,92 1.14 23.77
I 1600.00 11,00 355.71 1596,29 41.23 -0,16 41.14
1700.00 13.00 355.71 1694,10 61.96 -1.72 61.93
l._1?5~,~0_.___~4,O_0- ----~~!~- -- _1~~~,!_~---~~,~~_---_~2_.~9 ---- !3~~
Section 6: Start
---_._----~------------- ------
i MD Incl Azim TVD +N/-S +E/-W VS
I ft deg deg ft ft ft ft
!--,ooõ,oo 1~355.71-- 1791.22 85.66 -3.49 85,69
: 1900,00 14,00 355,71 1888.25 109,79 -5,30 109,88
i 2000.00 14.00 355,71 1985.28 133.91 -7,11 134,08
1_}_~1 ~..~---~-~.~O_- ~~,71~?~:.0~_~?..57 -7,39__~_~7..:_~5
Section 7: Start
[---~~._--~:_~-- ;~-~=~~~---- +N:~--- +Elfi:___- ~S
: 2100,00 17.39 355,71 2081.66 160.46 -9.11 160,70
'2200,00 21.39 355,71 2175,97 193.56 -11.59 193.89
i 2300,00 25,39 355.71 2267.73 233.15 -14.56 233,59
; 2400,00 29.39 355,71 2356.50 279,02 -18,00 279,59
,2500.00 33,39 355.71 2441.84 330.95 -21.90 331.67
2548,41 35,33 355,71 2481,80 358.20 -23.95 359,00
-------"--
DLS Build Turn TFO I
deg/100ft deg/1000 deg/10OO - deg ---- ----J
2.00 2,00 0,00 0.00
2,00 2,00 0,00 0,00
2.00 2,00 0,00 0,00
2,00 2.00 0,00 0.00
2,00 2,00 0,00 0.00
2.00 2.00 0,00 0,00
------------ ----.--- -- - - -~ -- ---
DLS Build Turn
deg/1000 deg/1000 deg/1000
0.00 0.00 0.00
0.00 0.00 0.00
0,00 0.00 0.00
0.00 0.00 0.00
TFO
deg
0.00
0.00
0,00
0.00
-------
DLS Build Turn TFO
deg/100ft deg/1000 deg/10OO deg
-----.---
4.00 4.00 0,00 0,00
4,00 4.00 0,00 0,00
4,00 4.00 0,00 0,00
4,00 4,00 0,00 0,00
4.00 4,00 0,00 0,00
4.00 4.00 0.00 0,00
- _._-.----- --
- -. -- -- - .--- --- .-.- ._- ---- - -._--- . --- -.
-- - - -
-- -----
¡
----~
I
------_J
--I
I
----~
Section 8: Start
-.- ---- .- -'------ --_._-----.- ------.. -- ------------------------ ---------------------------"----
MD Incl Azim TVD +N/-S +EI-W VS DLS Build Turn TFO
. - - - ft_-_._-~~--- - deg - ---- ~- ft .--- - -~-_._--~-- deg/100!t_~~/1000 d~10OO___- deg- ------ ------ .-:
2600,00 35,33 355.71 2523.89 387.95 -26.18 388,83 0.00 0.00 0,00 0,00
2700,00 35.33 355.71 2605.47 445,62 -30.51 446.66 0,00 0.00 0,00 0.00
2800.00 35.33 35571 2687.06 503.28 -34.83 504.49 0,00 0.00 0,00 0.00
2900.00 35.33 355.71 2768,64 560.95 -39.16 562,31 0.00 0.00 0,00 0,00
3000,00 35.33 355,71 2850.22 618.62 -43,49 620.14 0.00 0.00 0.00 0.00
3046.26 35.33 355.71 2887.96 645.29 -45,48 646.89 0,00 0.00 0.00 0.00
-- -- - - - - un --
- - -- - - - -
- - - -. - -
BP Amoco
Planning Report - Geographic
_.. -- --- . . .---- -- . --. -------- -- - .-.-,
.---- ------..--.---..
- - -- - -- ----- ---. --- --- ------- ----._-- -"."--- - -. _.._~._----------
I Company: BPAmoco Date: 12/4/2001 Time: 09:52:01 Page: 3
Field: Milne Point Co-ordlnate(NE) Referenc:e: Well: Plan MPS-15, True North
Site: M Pt S Pad Working Vertical (rVD) Reference: S-Pad Dev 72.0
Well: Plan MPS-15 Section (\'S) Reference: Well (0.OON.0.00E.355.88Azi) i
I Wellpath: Plan MPS-15 Plan: MPS-15 Wp03 ._..1
I - ~- - - .. ... - - . - - --- - - -.. - ---' - . - --' - . --. -...- -.- ..-- - "--.. ---....,.--.. --- . . -" -. --. . .-- -. - ..~--_._-- -- ~--------- ---". -- ------ -- .--- . . ---- .-----.
Section 9: Start
- - -'----- - -- '--' ...---..- - -- -.--..-.-- .._. - - ---........ ----- ---------_.. 4- .-. --_...- -.------.--.- ------ -I
l\1D Incl Azim T\'D +N/-S +E/-W \'S DLS Build Turn TFO
~ ft deg deg ft ft ft ft deg/1000 deg/100ft deg/1000 deg
- - - .-- - - - ----- -- _.- .... -- .-- --... -".. -. _.- ----~ ------ -.. -- - -- -.- --~.__. - --_._------------ . _._._-'~- ------ .------ - - --.- -- -
3100,00 33,56 355,71 2932.28 675,60 -47.75 677 .28 3,30 -3,30 0,00 180,00
3200.00 30,26 355,71 3017.16 728,30 -51,71 730,13 3,30 -3,30 0,00 180.00
I 3300.00 26,96 355.71 3104.94 776.04 -55.29 778.00 3.30 -3.30 0,00 180,00
I 3400,00 23,66 355.71 3195.33 818.66 -58.49 820,74 3,30 -3.30 0,00 180,00
I 3500,00 20.36 355.71 3288.03 856.02 -61,29 858.21 3,30 -3,30 0,00 180.00
I
I 3600.00 17.06 355,71 3382,73 887.99 -63,69 890,28 3,30 -3.30 0.00 180,00
; 3700.00 13,76 355,71 3479.13 914,48 -65.67 916,84 3,30 -3,30 0.00 180,00
3800,00 10.46 355.71 3576.89 935,39 -67.24 937,81 3,30 -3.30 0.00 180,00
I 3900,00 7,16 355.71 3675.70 950.66 -68.39 953.12 3.30 -3.30 0,00 180,00
i 4000,00 3,86 355.71 3775,22 960.23 -69,11 962.71 3.30 -3.30 0,00 180.00
i 4100.00 0.56 355,71 3875,13 964,07 -69,39 966.56 3.30 -3,30 0,00 180,00
j 4116,86 0,00 355,71 3892.00 964,15 -69.41 966.65 3.30 -3,30 0,00 -180.00
- -- - .- -. ---- - - - - - ..- .-.--- .~_. - --- ----. --.- .--- -- - -.---- -- -. -----'----------.---' -.--. -- _. - -. ...- -..- ._- - -
Section 10: Start
~ - --' '~IÌ>-- - -- i~~I-_u Azlm T\'D -----¡-N1=S +E/:\\~--VS---Dis-- Build -_. Tur~--- i-FO-- ----. ---- -',
: -- - -~ ._--_<!.~-- ---~~-------~---~--- -~----_._~__~eg/~Oft deg/100ft d_eg/10OO ___~eg ----- -----_J
'4200,00 0.00 355.71 3975.14 964,15 -69.41 966.65 0.00 0,00 0,00 355,71
4300,00 0.00 355,71 4075.14 964,15 -69.41 966,65 0,00 0,00 0.00 355.71
4400.00 0,00 355,71 4175.14 964,15 -69.41 966.65 0.00 0,00 0.00 355.71
4416.86 0.00 355.71 4192,00 964.15 -69.41 966.65 0.00 0,00 0,00 355.71
- --.-. --.
----_.- -- -- ---.
- -- -- - ----- - -. --- --------- -- - -_. - -.- -- ---' -.- ---- .-- - -
Section 11 : Start
- -- - ~ïD- --'--;c'I------A;i;---------TVõ"- -'-+N/-S----¡Eï:v.---;----'-'V-S----DLS Bulld"--'¡'~;~~FO - ---- '-- ----I
¡
: --' _ft_--_u . ~~__h__~~' ..._--_!!.. ---- ----~--_._-~-------~_.__~eg/1~~ d~g/10~~~/10OO deg ---~
4502.86 0.00 355.71 4278.00 964,15 -69,41 966,65 0,00 0.00 0,00 355.71
- - - . -. -. .-.- .._- -.-..-------- -' -.- .---------.-- - -----.----'-- --- .--- -------_._--
Section 12: Start
- --M"ö---i.;cl-A;im---TVD-+N/-S--:;['-W--VS-- DLS Bulld~u-;;--TFO -- -I
'_n__~.______d~_. deg -- ft ft ft ---~- deg/100ft deg/100ft deg/1000 - deg -----_.~
I 4600.00 0,00 355,71 4375.14 964,15 -69.41 966,65 0.00 0.00 0.00 355.71 i
4652.86 - O..O~-_.- - -~~~!~- --~~~:~~___~~~1~- -- ~?~_~~_~66.~__- 0.00 --~,~O_-- _0.~_~___~5~:~___--- ---1
Sun'ey
(------
I I\ID Incl
I ft deg
1- ------
! 72,00 0,00
100.00 0.00
200.00 0,00
300.00 0.00
400,00 1,00
500.00
600,00
700.00
800.00
900.00
1000.00
1100,00
1200.00
1300.00
1400.00
1500.00
1600.00
1700.00
1750,00
1800.00
2.00
3.00
2.00
1.00
0.00
1,00
2.00
3.00
5.00
7.00
9.00
11,00
13.00
14.00
14,00
Azlm
deg
355.88
0,00
0.00
0,00
165,00
165,00
165.00
165.00
165,00
0.00
355.71
355.71
355.71
355.71
355.71
355.71
355,71
355,71
355.71
355.71
TVD
ft
72.00
100,00
200,00
300,00
399,99
499.96
599,86
699,76
799,73
899.73
999.72
1099,69
1199.59
1299.34
1398.79
1497.81
1596.29
1694,10
1742.71
1791.22
----_._-------þ--------------
+N/-S
ft
0,00
0.00
0,00
0.00
-0.84
-3,37
-7.58
-11 .79
-14,32
-15,17
-14.30
-11.69
-7,34
-0,38
10,04
23.92
41.23
61,96
73.60
85.66
+E/-W
ft
0.00
0,00
0,00
0.00
0,23
Map
Northing
ft
5999990.60
5999990.60
5999990,60
5999990.60
5999989,76
Map
Easting
ft
565873,96
565873.96
565873.96
565873,96
565874,19
0.90 5999987.24 565874.89
2.03 5999983.04 565876,06
3.16 5999978,84 565877.22
3.84 5999976.31 565877,92
4.06 5999975.47 565878,15
3.99 5999976,34 565878,08
3,80 5999978.95 565877.86
3.48 5999983.29 565877 .50
2.96 5999990,24 565876.92
2.18 6000000,66 565876,05
1.14 6000014,52 565874,88
-0.16 6000031.82 565873,43
-1,72 6000052.54 565871 ,69
-2.59 6000064.17 565870.72
-3.49 6000076.22 565869.71
- - -. ---- - .
-- - - -.- - ~ .
<- Latitude --> <- Longitude ->
Deg Min See Deg Min Sec
-----
70 24 37.494 N 149 27
70 24 37.494 N 149 27
70 24 37,494 N 149 27
70 24 37.494 N 149 27
70 24 37.485 N 149 27
48,975 W :
48.975 W I
48,975 W I
48,975 W I
48.968 W !
70 24 37.460 N 149 27 48.948 W :
70 24 37.419 N 149 27 48.915 W ¡
70 24 37,378 N 149 27 48,882 W ~
70 24 37,353 N 149 27 48,862 W
70 24 37.344 N 149 27 48856 W
70 24 37,353 N 149 27 48.858 W
70 24 37379 N 149 27 48863 W
70 24 37.421 N 149 27 48,873 W
70 24 37.490 N 149 27 48.888 W
70 24 37,592 N 149 27 48.911 W
70 24 37.729 N 149 27 48,942 W
70 24 37.899 N 149 27 48.980 W
70 24 38.103 N 149 27 49.025 W
70 24 38.217 N 149 27 49,051 W
70 24 38336 N 149 27 49077 W
BP Amoco
Planning Report - Geographic
! ë~~~~~;;--èpA;~~-"--- ----- ----- ---------------------- ---------------------------------------- -- -~ ---
! Field: Milne Point
¡Site: M Pt S Pad Working
: Well: Plan MPS-15
! Wellpath: Plan MPS-15
.-.. -. -". . -. -" ---- --Þ ..- .--- -- ..-.--- - . "-- --. .--- -- --- -~- .. --"- -0 -. ----- _. - - - --.. -----". - ._--- -'-.--"-'-- . --..-. --.--- --. .
Sun'e)
- - .-- -----_. -.--- .-. . -. - -. -.-.
--- .-- - -..- -- .
]\10
ft
- -.. - - -.--
1900.00
2000.00
2015.16
I 210000
2200 00
~ 2300.00
: 2400.00
I 2500.00
2548.41
i 2600.00
2700.00
2800.00
2900.00
3000.00
3046.26
3100.00
3200.00
: 3300.00
, 3400,00
3500.00
I 3600.00
3700.00
3800.00
I 3900.00
: 4000.00
I
I 4100.00
i 4116.86
I 4200.00
4300.00
I 4400.00
I 4416.86
I 4502,86
, 4600.00
~ 4652.86
Incl Azim
deg deg
.- - -- _.- - -. ._._~ _.- ..
14.00 355.71
14,00 355,71
14,00 355.71
17.39 355.71
21,39 355.71
25,39
29,39
33,39
35.33
35,33
35,33
35,33
35,33
35,33
35,33
33.56
30,26
26,96
23.66
20.36
17,06
13,76
10.46
7.16
3,86
0,56
0,00
0,00
0,00
0.00
0,00
0.00
0,00
0,00
T\'D +N/-S
ft ft
. . -----.---.---
1888,25 109.79
1985,28 133.91
2000.00 137,57
2081.66 160.46
2175,97 193.56
355,71 2267.73
355,71 2356,50
355,71 2441.84
355.71 2481.80
355,71 2523,89
355.71 2605.47
355.71 2687.06
355.71 2768.64
355,71 2850.22
355.71 2887,96
355.71
355.71
355.71
355.71
355,71
355.71
355,71
355,71
355,71
355.71
2932,28
3017,16
3104,94
3195.33
3288,03
3382.73
3479.13
3576.89
3675.70
3775.22
355,71 3875.13
355,71 3892.00
355.71 3975.14
355.71 4075.14
355,71 4175.14
355.71 4192.00
355,71 4278,00
355.71 4375,14
355,71 4428,00
- . -- - - -.. - -..-
- -. - .- -."
233.15
279,02
330,95
358.20
387,95
445,62
503.28
560,95
618.62
645.29
675,60
728,30
776.04
818,66
856,02
887,99
914.48
935,39
950,66
960,23
964,07
964,15
964.15
964.15
964.15
964,15
964,15
964.15
964.15
Date: 12/4/2001 Time: 09:52:01 Page:
Co-ordlnate(NE) Reference: Well: Plan MPS-15. True North
Vertical (fVD) Reference: S-Pad Dev 72.0
Section (VS) Reference: Well (O.00N.O.00E.355.88Azi)
Plan: MPS-15 Wp03
.1
--- . - - -- .--
. -" "-_. ----------.'-'--- --- --'----."-'".-----.. ----.-
Map Map <- Latitude --> <- Longitude -> ¡
__~~~:I~~_--__~a~tl~g__- - ~__~~~n --~~-- -. ._~~g-~:~ . ~ec__- -- ¡
6000100.33 565867,69 70 24 38,573 N 149 27 49.130 W
6000124,43 565865,67 70 24 38,811 N 149 27 49.183 W '
6000128,09 565865.36 70 24 38,847 N 149 27 49.191 W :
6000150,95 565863,44 70 24 39.072 N 149 27 49.242 W i
6000184.03 565860,66 70 24 39.397 N 149 27 49.315 W
+E/-W
ft
..-.- W'- - - -.-
-5.30
-7.11
-7.39
-9.11
-11,59
-14.56 6000223,59 565857.35
-18.00 6000269.42 565853.50
-21 ,90 6000321.32 565849.15
-23,95 6000348,54 565846,85
-26,18 6000378,27 565844,36
-30,51 6000435,89 565839.53
-34.83 6000493.51 565834,69
-39.16 6000551.13 565829.86
-43.49 6000608.75 565825.03
-45.48 6000635.40 565822,80
-47,75 6000665.69 565820.25
-51.71 6000718.34 565815.84
-55,29 6000766,04 565811,84
-58.49 6000808,63 565808,26
-61.29 6000845.96 565805,13
-63.69 6000877,91 565802.45
-65.67 6000904,38 565800,23
-67.24 6000925,28 565798.48
-68.39 6000940.53 565797.20
-69,11 6000950.09 565796.40
-69,39 6000953.93 565796.07
-69.41 6000954.01 565796.06
-69.41 6000954,01 565796,06
-69.41 6000954,01 565796,06
-69.41 6000954.01 565796.06
-69.41 6000954.01 565796,06
-69.41 6000954.01 565796,06
-69,41 6000954,01 565796,06
-69,41 6000954.01 565796,06
- .--..-- ---.- - -~ -."'
_u- -- - - .
- --- --'---"----------
- -. --.. - - . - - - - - ,- - ." - - . - - - . - - . -. .
70 24 39,787 N 149 27 49.402 W :
70 24 40,238 N 149 27 49.502 W '
70 24 40.748 N 149 27 49,617 W I
70 24 41,016 N 149 27 49.677 W !
70 24 41.309 N 149 27 49,742 W '
70 24 41.876 N 149 27 49.869 W I
70 24 42,443 N 149 27 49,996 W
70 24 43.010 N 149 27 50,123 W
70 24 43,578 N 149 27 50,249 W
70 24 43,840 N 149 27 50,308 W
70 24 44,138 N 149 27 50.375 W
70 24 44.656 N 149 27 50.490 W
70 24 45.126 N 149 27 50,595 W
70 24 45.545 N 149 27 50,689 W ¡
70 24 45.912 N 149 27 50.771 W '
70 24 46.227 N 149 27
70 24 46.487 N 149 27
70 24 46,693 N 149 27
70 24 46,843 N 149 27
70 24 46.937 N 149 27
70 24 46,975 N 149 27 51.009 W
70 24 46.976 N 149 27 51.010 W
70 24 46.976 N 149 27 51.010 W
70 24 46.976 N 149 27 51,010 W
70 24 46,976 N 149 27 51,010 W
50,842 W
50.900 W i
50.946 W
50.980 W ¡
51,001 W !
i
I
I
I
I
70 24 46,976 N 149 27 51,010 W
70 24 46,976 N 149 27 51.010 W
70 24 46,976 N 149 27 51,010 W
70 24 46,976 N 149 27 51.010 W
BP Amoco
Anticollision Report
--------. -.--. ------- .----_. ----------- ----------
---.- -- ------------------
Company: BP Amoco
Field: Milne Point
Reference Site: M Pt S Pad Working Co-ordinate(NE) Reference: Well: Plan MPS-15. True North
¡ Reference WeU: Plan MPS-15 Vertical (f\'D) Reference: S-Pad Dev 72.0
¡, ~~~e~~~~~e~'-~~~~:7=--~~~~.~~~;~~- :._-:_--::.~:C_--c7=.-=-:--~_7~~_- _.--- - -----~-_. - .. - __m- ------------- --. Db: Oracle ---
- . - .- R;¡:;ren~;:. - -- . --PI~~-:-MPS~1-5W¡;Ö3 & ÑOT Pi:ÃNNED*~OGR
Error Model: ISCWSA Ellipse ¡
Scan !\Iethod: Trav Cylinder North !
- - . . - -. ~rro~_~~~f~~e.: - -- - ~I~ip_~~~. -~~~~~- - __I
Date: 12/4/2001
Time: 09:35:29
Page:
II NO GLOBAL SCAN: Using user defined selection & scan criteria
Interpolation Method: MD Inten'al: 50.00 ft
, Depth Range: 72,00 to 4652.86 ft
Maximum Radius: 658.09 ft
Casing Points
. -.- - --.--------.. --- _a-_-
-."-. -~ ~------- ---- - -.- --- -- .---'
- -. -~_._-_._-
.. -- --'-- "-' .---
-.-------------. - --- --- ---------1
-.-----------.---.---. -0_--- ---,--- ,- -"----"---'\
-- ----- -- _J
!\tD TVD Diameter Hole Size
ft ft in in
I 4652:85"----44"27-,99 -- ---7.0ÕC)"-- .-- - -ã,söõ- - -7"--- - .
Name
. - -- - - -
.-.-.. -- - - - ---------- ------------ ---.- --
¡Plan: - -. - ..-- -- -.- -.- --.-- - - ---- . - -. - . - - - - - ~- - -- ----.--- - .-----.------------.- - -- - .----- ----._----._--
I MPS-15 Wp03 Date Composed: 12/4/2001
I. ~r~_(~pal:. Version: 1
Yes Tied-to: From: Definitive Path
_. ---.----- - - -- - - - -.-- ----- -. --. - ----. ----'--'- n-
Summa!)'
--_. ----'----- ----
r~ Offset WeJlpath > Reference Offset Ctr-Ctr No-Go Allowable
Site Well Wellpatb MD MD Distance Area De\'iatlon Warning
ft ft ft ft ft
-----------.----.----.-------.-------- ---
M Pt S Pad Working MPS-Amold Plan MPS-Amold V4 Pia 698,93 700.00 212.02 13,90 198.13 Pass: Major Risk
M Pt S Pad Working MPS-Amold Plan#1 MPS-ArnoldAL2 V 698.93 700.00 212,02 13.83 198,19 Pass: Major Risk
: M Pt S Pad Working MPS-Amold Plan#1 MPS-AmoldAL3 V 698.93 700,00 212.02 13,83 198.19 Pass: Major Risk
i M Pt S Pad Working MPS-Amold Plan#2 MPS-AmoldA V2 698.93 700,00 212.02 13.83 198.19 Pass: Major Risk
I M Pt S Pad Working MPS-Amold Plan#2 MPS-ArnoldAL 1 V 698.93 700.00 212.02 13.83 198.19 Pass: Major Risk
M Pt S Pad Working MPS-111 Plan MPS-III V1 Plan: 549,54 550.00 46.79 11.48 35.31 Pass: Major Risk
M Pt S Pad Working MPS-Q3 Plan MPS-Q3 VO Plan: M 1300.74 1300.00 3.00 22.26 -19.25 FAIL: Major Risk
M Pt S Pad Working MPS-Q5 Plan MPS-Q5 V1 Plan: M 400,01 400.00 210.12 8,55 201.57 Pass: Major Risk
M Pt S Pad Working Plan MPS-01 Plan MPS-01 VO Plan: M 500,00 500,00 213.60 10.58 203,02 Pass: Major Risk
M Pt S Pad Working Plan MPS-02 Plan MPS-02 V2 Plan: M 599,84 600.00 195.68 12.03 183,65 Pass: Major Risk
M Pt S Pad Working Plan MPS-03 Plan MPS-03 V2 Plan: M 400,00 400,00 180,65 8.74 171.91 Pass: Major Risk
M Pt S Pad Working Plan MPS-Q4 Plan MPS-04 V1 Plan: M 450,03 450.00 166.25 9,00 157,25 Pass: Major Risk
M Pt S Pad Working Plan MPS-05 Plan MPS-05 VO Plan: M 599.76 600.00 150,78 12.37 138.41 Pass: Major Risk
M Pt S Pad Working Plan MPS-06 Plan MPS-09 VO Plan: M 750,03 750.00 133.74 14.28 119.46 Pass: Major Risk
M Pt S Pad Working Plan MPS-07 Plan MPS-07 VO Plan: M 399.99 400.00 120.55 8.77 111,78 Pass: Major Risk
M Pt S Pad Working Plan MPS-08 Plan MPS-11 VO Plan: M 449.92 450.00 106.13 9,69 96,44 Pass: Major Risk
M Pt S Pad Working Plan MPS-09 Plan MPS-06 Pilot V2 P 599.80 600.00 90.58 11,96 78.62 Pass: Major Risk
M Pt S Pad Working Plan MPS-09 Plan MPS-06 VO Plan: M 599.80 600.00 90,58 11,96 78.62 Pass: Major Risk
M Pt S Pad Working Plan MPS-10 Plan MPS-13 VO Plan: M 449.91 450.00 75.81 9,70 66,11 Pass: Major Risk
M Pt S Pad Working Plan MPS-11 Plan MPS-06 VO Plan: M 500,01 500,00 61.14 9,80 51.34 Pass: Major Risk
i M Pt S Pad Working Plan MPS-12 Plan MPS-12 VO Plan: M 599.70 600,00 46.11 12.39 33,72 Pass: Major Risk
I M Pt S Pad Working Plan MPS-13 Plan MPS-10 VO Plan: M 849.56 850.00 31,01 14.75 16,26 Pass: Major Risk
: M Pt S Pad Working Plan MPS-14 Plan MPS-14 VO Plan: M 549.84 550,00 16,03 11.50 4.54 Pass: Major Risk
! M Pt S Pad Working Plan MPS-16 Plan MPS-16 VO Plan: M 449,74 450.00 15,61 9.70 5.91 Pass: Major Risk
i M Pt S Pad Working Plan MPS-17 Plan MPS-16 VO Plan: M 599.66 600.00 31.32 12.39 18.93 Pass: Major Risk
: M Pt S Pad Working Plan MPS-18 Plan MPS-19 VO Plan: M 449,88 450,00 45,79 9.65 36,13 Pass: Major Risk
I M Pt S Pad Working Plan MPS-19 Plan MPS-17 VO Plan: M 499.68 500.00 60,95 10,56 50,40 Pass: Major Risk
I M Pt S Pad Working Plan MPS-20 Plan MPS-20 VO Plan: M 599.64 600.00 75.87 12.35 63.52 Pass: Major Risk
I M Pt S Pad Working Plan MPS-21 Plan MPS-21 V6 Plan: M 499,67 500,00 91.06 10,55 80,51 Pass: Major Risk
M Pt S Pad Working Plan MPS-22 Plan MPS-24 VO Plan: M 699,40 700,00 105.70 12.63 93,08 Pass: Major Risk
: M Pt S Pad Working Plan MPS-23 Plan MPS-22 VO Plan: M 599.63 600.00 120.82 12,33 108.49 Pass: Major Risk
¡ M Pt S Pad Working Plan MPS-24 Plan MPS-28 VO Plan: M 449.96 450,00 136.09 8,99 127.10 Pass: Major Risk
M Pt S Pad Working Plan MPS-25 Plan MPS-23 VO Plan: M 449,86 450,00 151.34 9.58 141.75 Pass: Major Risk
I M Pt S Pad Working Plan MPS-26 Plan MPS-27 VO Plan: M 399.95 400.00 165.64 8,66 156.99 Pass: Major Risk
M Pt S Pad Working Plan MPS-27 Plan MPS-25 VO Plan: M 599.60 600,00 180,84 12.18 168.66 Pass: Major Risk
M Pt S Pad Working Plan MPS-28 Plan MPS-29 VO Plan: M 599.60 600,00 195.92 12,26 183,67 Pass: Major Risk
M Pt S Pad Working Plan MPS-29 Plan MPS-26 VO Plan: M 650.03 650.00 213.60 13.06 200,54 Pass: Major Risk
M Pt S Pad Working Plan MPS-30 Plan MPS-31 V1 Plan: M 549.28 550.00 224,59 11,42 213.17 Pass' Major Risk
M Pt S Pad Working Plan MPS-31 Plan MPS-30 V2 Plan: M 599.63 600,00 240,97 11,99 228,99 Pass: Major Risk
M Pt S Pad Working Plan MPS-32 Plan MPS-32 VO Plan: M 449.93 450.00 256.25 9,00 247,25 Pass: Major Risk
M Pt S Pad Working Plan MPS-33 Plan MPS-33 VO Plan: P 599.58 600.00 270.99 12.20 258.80 Pass: Major Risk
- -----------.-------- - - - - ------- -- ----. --- .-----
PS-15i pcrmit
Subject: MPS-15i permit
Date: Wed, 26 Dee 2001 12:19:53 -0600
From: "CampbelL Steve K" <CampbeIS@BP.eonl>
To: "\vinton- aubert@admin.state.ak.us'" <winton - aubert@admin.state.ak.us>
As per Tom Maunders request for clarifications to the permit on MPS-15i:
'./1 "Cement yields:
r'>'b ~-3A:" surface casing: lead = 4.15 cuft/sx & tail = 1.15 cuft/sx
7" production casing: tail = 1.15 cuft/sx
Top of cement for the 7" production casing is planned at 3757' MD
Lt' . 'SIr"
The 1.9-~" shoe test will be (FIT to 10.0 ppg EMW)
At the end of the well the
bullheading diesel down to
~~ote: Cutting samples will
is the first well on a new
10-3/4" x 7" annulus will be freeze protected by
the shoe of the 10-3/4" casing.
also be caught as per AOGCC regulations as this
pad.
If you need any further information please call me today.
Thanks for your help & have a great day!
Steve Campbell
907-564-4401(0)
907-564-4441(f)
campbels@bp.com
1 of I
12/26/01 9A::! Af\,1
MPU S-15i
Shallow Aquifer Protection b)' Proposed Surface Casing
(Notes to File)
BP proposes to drill the MPU S-l 5i water injection well in the south\vest comer of the
Milne Point Unit. Ihis well \vill be the first \vell drilled from the Milne Point Unit S-
Pad.
Ihe concern is that proposed surface casing will protect all kno\vn USDW's. AEO 2
provides exemption for shallo\\1' aquifers at Milne Point within various sections in TI3N~
R 9,10,11 E, but the proposed S-15i well lies in S. 12, TI2N, R IOE~ \vhich is about 1.5
miles south of AEO 2 exempted area.
Io check if the proposed surface casing will protect all kno\vn USDW~s, well records and
AEO 2 tiles \vere examined for \vater samples, and IDS calculations were performed
using \velllogs.
Water Sample Data
MPU CPF-I water source \vell (located 3 miles NNE of S-15i) was open from 2905 -
331 O~ MD (2608 - 3088' TVD) in 1986~ and IDS values for water san1ples taken on Jan.
3.1986 and Jan. 6,1986 were measured at 3162 ppm and 2500 ppm, respectively.
Conoco's Production Research Division (PRD) measured "salt" concentration in samples
from CPF-l at 3260 ppm. AEO documents indicate that four \vater samples from the
MPU B-Ol \\1'ell (located 4.5 miles NNE ofS-15i) ranged from 3160 to 3539 ppm IDS.
TDS Calculations from Well Logs
Well logs from the Texaco Prudhoe #1 and MPU H-Ol \vells were used to quickly
calculate IDS content of well-developed shallow sands beneath the pern1afrost using
resistivity and porosity data. The SP technique was not used as the SP data are
notoriously erratic at Milne Point.
Texaco Prudhoe #1
Top MD Base MD Approx. TVD TDS Comments
2600 2629 2615 3532 Density-Neutron curves separated
2837 2853 2845 3239 Density-Neutron curves separated
MPU H-Ol
Top MD
2598
2623
2627
Base MD Approx. TVD TDS Comments
2623 2341 3254 Density-Neutron curves separated
2627 Thin shale bet\veen sand lobes
2650 2369 1570 Den-Neutron curves crossover
MPU H-Ol Density- Neutron Log
I
I
I
I
I
I
I - .
I
H8. ~~- f ¡
~~~~~,~ rtl,1
I ~ ~ .. . .. - Gas indicated by
I ---'? ,...==-"" cross-over of curves
l ~~-~.'~~ -\--e700~~~~=~~~ . J L.. j )! I r
L::.-" -- ' ~ j' ..1'$ ,1. I
Ii <
Il ". ~
Log analysis is complicated in this portion of the Milne Point Unit by shallo\v gas, \vhich
causes calculated salinity values to be unrealistically low by overestimating the porosity
of the sand. An excellent example is found in the MPU H-Ol \vell. TDS calculations
were performed in a sand consisting oft\vo lobes that are separated by a 4-foot thick
shale.
The lower sand lobe clearly sho\vs cross-over of the density and neutron porosity curves,
indicating that gas is present in the sand. TDS calculations for this sand lobe yield a
value of 1570 ppm using the density porosity and resistivity data (porosity derived from
density curve alone matched provided the closest match to the laboratory water analysis
results ).
The overlying sand lobe, \vhich is separated by a 4-foot thick shale layer, sho\v density
and neutron curves that are widely separated, indicating a lack of gas \vithin the sand.
TDS calculations for this upper sand lobe yield a value of 3026 ppm using the density
porosity and resistivity. The TDS calculations for the upper sand lobe agree very \veIl
\vith the 3160 to 3539 ppm value range derived from 5 of the 6 \vater samples taken fron1
the MPU CPF-l and B-1 \veIls, and \vith the 3260 ppm concentration measured in CPF-l
by Conoco' s PRD group.
Summary
Surface casing in proposed S-15i \\iill be set at 2548' MD (2482' TVD). Water sample
data and log calculations indicate the salinity of the sands at this depth and below \vill be
greater than 3000 ppm. Surface casing set at the proposed depth in MPU S-15i will
protect potential sources of drinking \vater having salinity less than 3000 ppm.
Steve Davies
December 20, 2001
1900860
SFD picked data
Run
Parameters:
KB
Surface
B/Permafrost
Run Bot
Shallow T
Max Temp
Temp Grad
Rmf
Rmf Temp
RESISTIVITY METHOD
Top Depth Base Depth
RES/DEN
2598
2627
RES/DEN-NEU
2598
2627
1
72ft
Oft
1872 ft
5242 ft
32 F
104 F
0021365
1 35
60 F
a=
Ave Depth - TVD
2623
2650
2611 2341
2639 2369
2623
2650
2611 2341
2639 2369
MPU H-1 Salinity Calculations
0.62 m= 2.15 Estimated
Thick GR Rt PhiD PhiN Dtave PhiS Phi Temp Fm F Rw Rw75 TDS Comments
2269 25 14 0.37 ? #VALUE! 0.3550 478 5.7465 2.4363 1.6252 3254 Den-Neu widely separated
2297 23 22 0.395 ? #VALUE! 0.3950 484 4 5678 4.8163 3.2482 1570 Den-Neu Cross-over
2269 25
2297 23
14 037 0.4250
22 0.395 0.4000
#VALUE!
#VALUE'
47.8 4.5063 3.1068 2.0725
48.4 4.5063 4.8821 3.2925
2518 Den-Neu widely separated
1548 Den-Neu Cross-over
?
?
0.3975
0.3975
1821210
SFD picked data
Run
Parameters:
KB
Surface
B/Perrnafrost
Run Bot
Shallow T
Max Temp
Temp Grad
Rmf
Rmf Temp
RESISTIVITY METHOD
Top Depth Base Depth
RES/DEN
2600
2837
RES/DEN-NEU
2600
2837
1
75 ft
Oft
1875 ft
7506 ft
32 F
147 F
00204227
1,35
60 F
a=
Ave. Depth - TVD
2629
2853
2615 2615
2845 2845
2629
2853
2615 2615
2845 2845
Texaco Prudhoe #1 Salinity Calculations
0,62 m= 2.15
Thick GR Rt Phi 0 PhiN Dt ave Phi S Phi Temp Fm F Rw Rw75 TDS Comments
2540 29 12 0.37 ? #VALUE! 0.3700 47.1 5.2572 2.2826 1.5038 3532 Den-Neu separated
2770 16 11 0.385 ? #VALUE! 0.3850 51.8 4,8267 2.2790 1 ,6327 3239
2540 29
2770 16
12 0.37 0.4100
11 0.385 0.4400
?
?
#VALUE!
#VALUE!
0.3900
0.4125
47,1 4,6946 2,5561 1,6840 3134 Den-Neu separated
51,8 4.1613 2,6434 1,8937 2770
H 202450
DATE
12/07/01
CHECK NO.
()Q202450
DATE
INVOICE I CREDIT MEMO
DESCRIPTION
GROSS
VENDOR
DISCOUNT
ALASKAOILA
NET
00
120501 CK120501
PYMT COMMENTS:
HANDLING INST:
100.00
100.00
Pernit to Drill 7ee
5/H - Terrie HubJle X4628
1Y12~/V€
D( D
(1 ..,
~I (\ "f"'
lðSka Oil /.' /; ,:
& Gas ,...
4 vOr¡~.
f1chcr~_' (,Ofr1"JJC:n
u,Vf.J "Uò)JrJf.
-íYl-PS - l S I'
IE ATTACHED CHECK 15 IN PAYMENT FOR ITEMS DESCRIBED ABOVE,
'TOTAL,~
100.00
100.00
BP EXPLORATION, (ALASKA) INC.
P.O. BOX 196612
ANCHORAGE, ALASV.A 99519.6612
FIRST NATIONAL BANK OF ASHLAND
AN AFFIUATE OF
NATlmlAL CITY BANK
CLEVELAND. OHIO
I
No. H2O 2 4 5 0 '
CONSOLIDATED COMMERCIAL ACCOUNT
56-389
--¡:j2
00202450
PAY
ONE HUNDRED & 00/100************************************* US DOLLAR
DATE
12/07/01
AMOUNT
$100.00
To The
ORDER
Of
ALASKA OIL AND GAS
CONSERVATION COMMISSION
333 WEST 7TH AVENUE
SUITE 100
ANCHORAGE
NOT VALID AFTER 120 DAYS
AK 99501
"J~ ßf~t,~,_~
/II 2 0 2 L. 5 0 III I: 0 L. ~ 2 0 :18 g 5 I: 0 0 8 ...... ¡. g III
TRANSJ\1JT AL LETTER CHECK LIST
CIRCLE APPROPRIATE LETTERlPARAGRAPHS TO
BE INCLUDED IN TRANSM1TTAL LETTER
WELL NAME /fl ¡/¡J 5~ is L'
CHECK 1
ST ANDARD LETTER
DEVELOPMENT
CHECK \VllAT APPLIES
ADD-ONS (OPT]ONS)
MULT] LATERAL
(If api number last two (2)
digits are between 60-69)
DEVELOPMENT
REDRILL
PILOT HOLE (PH)
EXPLORA TI0N
ANNULAR DioSAL
1PNO
INJ~7"ELL
ANNULAR D]SPOSAL
<--.) YES
INJECTION WELL
REDRILL
ANNULAR DISPOSAL
TH]S WELL
"CLUE"
The permit is for a Dew well bore segment of existing well
~ Permit No, AP] No.
Production should continue to be reported as a function of
the original AP] number stated above.
]n accordance with 20 AAC 2S.00S(f), all records, data and
logs acquired for the pilot hole must be clearly
differentiated in both name (name on permit plus PH)
and AP] number (50 -70/80) from
records, data and logs acquired for well (name on permit).
Annular disposal has not been requested. . .
Annular Disposal of drilling wastes will not be approved. . .
Annular Disposal of drilling wastes will not be approved. . .
DISPOSAL INTO OTHER Please note that an disposal of fluids generated. . .
ANNULUS
L-J YES +
SPACING EXCEPTION
Enclosed is the approved application for permit to drill the
above referenced well. The permit is approved subject to
full compliance with 20 AAC 25.055. Approval to perforate
and produce is contingent upon issuance of a conservation
order approving a spacing exception.
(Company Name) will assume the liability of any protest to
the spacing exception that may occur.
~''?
.. ' ",-1,/.' ", /,,1 /1 d .
~~)f k-ell~l/ IJ/;//!{ ~-,;:d ~7 /11¿J;fj/ .
~{W1-<¿é'(.i.--¿ .\ r~~</I "::;Ù/' '4 X ~ /-,({;çh'-.-
J / ¿, ' , "{. " / L' , -, .-,
Templates are located m drh'eljodyltemplates ~ C Û....)¿.U:¡hC'/1 -- ¡{~ "'7'[-'~' "1,1:'-71'-
-,-b¿-¡;.'7~~ &'-?7ðL~- -Þ T ð.
~M
I) I~¡':~l (
WELL PERMIT CHECKLIST - COMPANY ß f~' X WELL NAME ,;S -/~/.' PROGRAM: exp - dev. ~ redrll - serv /' well bore seg _ann. disposal para req -
FIELD & POOL ,5.?sJ'-iú INIT CLASS ~ V í It.-},'^^:J '* GEOL AREA 5?7¿>' UNIT# () / I~ 32){" ON/OFF SHORE 0/)
ADMINISTRATION 1. Permit fee attached. . . . . . . . . . . . . . . . . . . . . . .~) N
2. Lease number appropriate..-?¥. ~~,"¥; <'~rr~.¡'~, ¡G? ~ 7(c.: '. vrN: /:¡'~70';>~ UJ~( /¡¿~ ¿'~'I--rre...j w'i-/¿~-"~ /7Þ¿ ..3<ff¿;/C5T..
3. Unique well name and number. .. . . . . . . . . . . . . . .. ~Ñ J. ..
4. Welllocatedinadefinedpool.................. '1'-l!D ~-p~ /~è~ ~t/Ä~/..¿.,~' ..5.cÄ~,. &~l-f~C),.,//;:;'/ ¿?..; ~~ý'0/r.<4'~
5. Well located proper distance from drilling unit boundary. .. . '"' N ~ () () ;¿.s:5 ~i~~'7c4. ..5ç:p" - ~¡:"" ~ ¿'
6. Well located proper distance from other wells.. . . . . . . . . . " NO' - . " ~ ~ V "--c. '-"'J (Iv /c => . '
7. Sufficient acreage available in drilling unit.. . . . . . . . . . . V N
8. If deviated, is wellbóre plat induded.. . . . . . . . . . . . . . N ¡:.-; ,:...:;;/ /4
9. Operator only affected party.. . . . . . . . . . . . . . . . . . N .
10. Operator has appropriate bond in force. . . . . . . . . . . . . N ~t1.-.f?k:J I art.....)
11. Permit can be issued without conservation order. . . . . . . . N I,'
APf~ DATE 12. Permit can be issued without administrative approval.. . . . . .; N cP-7,d~Þ .
/iL :) '2' /7' C I 13. Can permit be approved before 15-day wait.. . . . . . . . . . ) N
ENGINEERING 14. Conductor string provided. . . . . . . . . . . . . . . . . . . ~ // (' r. '/.. " ~ Î /' .
15. Surface casing protects all known USDWs. . . . . . . . .; .I'J.-,,~.::::>~,~-(r .~) diylt!- /"~ z?~f5 rHÞ<.....-zt.lf!2.. 7V'''l...¡r-.-.- .5':'<"(-1"4-<'<- L'b"1
16. CMT vol adequate to circulate on conductor & surf csg. . . . . . N ~ ,/J'?/"'t.L ~ ~/:>¿. ;l{ñ.4~7ð/5 ~~-/I ~ h.:1?1'L </'1/<;)/(. ",ý'-( ~/ IL\L4..tCò
17. CMT vol adequate to tie-in long string to surf csg. . . . . . . . .I N {~~,-Vd!:b'¿- #"' / vt-<-d/~P~ .:si:L/,.;,,..4., % ,e:æ¿fI ~ ~..¡ -It...,S. d'7'.:¥/: ,...:1k,.;.ld
18. CMT will cover all known productive horizons. . . . . . . . . . N ~ ~rx-" 3.200 ~qof.l¿J,nl,.. ....,/l}¡-¿L e!.r:::/ lU-lk". ðUI~<.?t..:.:; z:.~
19. Casing designs adequate for C. T. 8 & permafrost. . . . . .. - . N ~~ -- .3k'l..ì ,. .~,? /)(.Z':/ s.. '.H:-c:I - a.-"ku'¡- -=>3:-Dv'~:!ft TP'~' -?.If?,; é ð-? ~.c:i~' /) ,
20. Adequate tankage or reserve pit.. . . . . . . . . . . . . . ...... II ~ N ~,A~t..-4 .>'1v:4'~.,.c.d '31{çD' :3S 3q 7]:» .' H~~U..l:.f.t:..v (Ey.,.:.~¿~ tJ~r-: (:~
21. If a re-drill, has a 10-403 for abandonment been approved. . . JJIA. Y N #-"2-" IHt.t.?1 þ.¿vÆ_~'L~H.C'e.d :0 t.-}u2,4..dë þ- ¡::/'i..C/tt:Lr.jj~L. :..$.2-..2- /'Íß
22. Adequate well bore separation proposed.. . . . . . . . . . . . N /ló I-L S -4:, h k .J:Z-.r-. 3-dd. ..fw-Ÿl.~...t ex IS c. ,-,.$> (ð?--t. . t 7 . -. /'). 0'. _c/~
23. If diverter required. does it meet regulations. . . . . . . . . . .I N S/'¿v!- ~4Y~¿¿l( ¿.. .,::~..sc i..1~- .1~d ~ mUc/¡? Stt'- "" /" :.e. ';1~;6. .
24. Drilling fluid program schematic & equip list adequate. . . . . N ..fp Ac6 o:q:.z ~~ .::Sc.t'~VÃd.vl ~/I. ff /pe/ (e.....(e~ .. ~'~/~'¿':~-'Z''--' ??r.,,?'
25. 80PEs, do they meet regulation. . . . . . . . . . . . . . . . N /!..t->l¿.5 ~ ,¿ -;./ /;;t .,4,'5 51."1 R~~<-t fl..../ 12.~/2->. .42) 7
26. BOPE press rating appropriate; test to 2.50(' psig. N
27. Choke manifold complies w/API RP-53 (May 84). . . . . . . . N
28. Work will occur without operation shutdown. . . . . . . . . . . ~
29. Is presence of H28 gas probable.. . . . . . . . . . . . . . . . Qf
30. Permit can be issued w/o hydrogen sulfide measures. . . . . &) N
31. Data presented on potential overpressure zones. . . . . . . a;N
32. Seismic analysis of shallow gas zones. . . . . . . . . . . . . - - ~
AP~R DATE 33. Seabed condition survey (If off-shore). . . . . . . . . . . .. ~ \VV N
/6'/) I 2.'. I~, ¿~ I 34. Contact name/phone for weekly progress reports [explorat~nIYJ Y N
ANNULAR DISPOSAL35. With proper cementing records, this plan .
(A) will contain waste in a suitable receiving zone; . . . . . . .
(8) will not contaminate freshwater; or cause drilling waste. "
to surface;
(C) will not impair mechanical integrity of the well used for disposal; Y N
(0) will not damage producing formation or impair recovery from a Y N
pool; and
(E) will not circumvent 20 MC 25.252 or 20 MC 25.412. Y N
GEOLOGY: ENGINEERING: UIC/Annular COMMISSION:
Rþ&1fl'( .W wGA iqr.v WM 8~' (1
s ¿~ ' TËM.k)!?\'Vll~I~ \ JM~ J~~ril (
4Pf~^ DATE
{t]'.-!" l Cd-I'¡t- \
w6A Il../ Lc:"
GEOLOGY
APPR DATE
Y N
Y N
c:\msoffice\wordian\diana\check.list (rev. 11/01/100)
~~1' ¡t(iU/ -!2d (¿;//'~'-~Y /lttLLi;~A I
/',// '/.' / ." p'
rU/I ~(.,'I"¡-<-- t' /1'::; ~'u.j4/ M7V
¡/d I~~ ~1í þ>< a~k~4J ~,~ ¿':5~!,hc"-<I- co.>a--.--¡Çk ~
if¿ ~I !~~$ c¡Þ'~1-- ;# .h:¿: , ¡1
/'Ý~.;t'l~ (fJ'~:;'~''fZ¿/.J(IV'\ ~~ q-r;.-:L¿;.¿~\-I- -~~',.
" /V'/)/, // :.; ,J
~¿¡,,-wlk..:5 """l'l:/ .,¿,,4\.L.:.-l.:--¡(k."<X: ~
ll.iJ 5e.¡J (2, L 'If v; k.v:L-¡ú!-1u-fi1(o,,-¡ '- ðY d...è--r" / _tL~ 7I1Ld~y/'
l.-:t/-~-oC-:)¿L( ,:o-j /( 11¿.,j- L a-'/Ä: ~ ~ /J'?' î'( .-' / V
f..~~'J\r..0\5~\ ~ ~\:::~, ~(¿d::- L"~;C~ .¡.~
Comm,nts/lnstructior)!i: I
¥ ¿uJ~ ~,.j-.,I ~~~ c.-H,/ ,4/0 '5 ùi:~-,j,-/
/'../ ,,~k$ -/3 ¿., fd~~ /ðdJ /£./J be..
~J-4~j /k A,we. /7 ~ t.
. &:5' IV?! ;;~ ~~
J;:..?qe/" /' ¿' /¿, ¡¡:- /'
~ o/~,-' Ú ,t It_) /f/~
c
0
Z
O(
~
:E
:xl
~
m
z
~
.J:
en
>
:xl
m{
>
Well History File
APPENDIX
Information of detailed nature that is not
particularly gennane to the Well Permitting Process
but is part of the history file.
To improve the readability of the Well History file and to
simplify finding information. information of this
nature is accumulated at the end of the file under APPENDIX.
No special effort has been made to chronologically
organize this category of information.
dOJ-dtf5
IO{¡;70
Sperr~'-Sun Drilling Ser,-ices
LIS Scan Dt i 1 i t~'
$Fe":ision: 3 $
LiELib $P.e'.'ision: -l $
Thu Mar 21 12:3-1:32 2002
Peel Header
Sec'ice name............. LISTPE
Da. t e. . . . . . . . . . . . . . . . . . . . . 02 0 3 2 1
Origin. . . . . . . . . . . . . . . . . . . STS
Peel lJame..... . . . . . . . . . . . Ul1ElJú\¡JH
Cone inu.a t ion lJumber. . . . . .01
pre'.'ious Reel lJame...... . UIWllOtrJ1.}
COITrnents................ .STS LIS
Writing Library.
Scientific Technical Ser,:ices
Tape Header
Ser:ice name............. LISTPE
Da e e. . . . . . . . . . . . . . . . . . . . . 02 I) 3 2 1
Dr iç:¡ in. . . . . . . . . . . . . . . . . . . STS
Tape Uame. . . . . . . . . . . . . . . . U1I¥.lJO\'oITT
ContinuaClon lJumber..... .01
Pre" ious Tape Uame. . . . . . . ill,WlJOII'JU
Comments................ .STS LIS
Nr it ing Librar:/.
Scientific Technical Ser~ices
Pl'l~'S ica 1 EûF
Comment Pecord
T.;é..PE HL;é..DEP.
uilne Point
I.TI'JD r-L:'.D LOGS
#
\,:'IELL i J.:'J.IE:
;'.P I LJUllBER:
OPEP';'.TOP. :
L()GGI¡IG COHP.:'.lT"I:
T.:'.PE CP.EXTIOlT 0.:"'1'£:
#
JOE D.:'.T,:'.
¡.!PS-15
:,00292306100
SP Exploration (Alaska) I Inc.
Sperr:z'- Sun Or ill ing Ser:i ces
2 1 -l.t:'.R - 0 2
JOB Uill lEEE :
LOGGIlTG EnGInEER:
OPEP';'.TOF l'JITlTESS:
I !VJD EUl T 1
.::X.-I.!L.! - 2 2 0 15
P. Sl.ll TH
C. OL:OlJ
l n,'.JD Em ¡ 2
.:'X-UlI- 2 2 0 15
J. PITCHER
C. DI:.,:OIJ
#
SUP.F ;'.CE LOC.;é..TIOlJ
SECTIOlr:
TOhTllSHIP:
EA.lIGE:
FIJL:
FSL:
FEL:
F\'IlL:
ELE'.'.;ë..TIC)! \ FT FPOl.l
Y.ELL'l' BUSHIlJG:
DEPEICE FLOOP.:
GP.':)VUD LE'..'EL:
12
12lJ
10E
3323
136
[.ISL 0 ,
""73.20
38.80
#
\\lELL C,:'.S IlJG P.ECOP.D
1 ST STP.IlJG
2I'JD STEIlIG
OP£II HOLE C;'.S lUG DE I LLEPS
BIT SIZE (III) SIZE (III) DEPTH (, FT)
12.250 20.000 113.0
3.500 9.625 2~99.0
.3RD STRIiJG
PRODUCTIO¡ j STF.IlJG
"#
P.El-L~Rl:S :
1. ,~LL DEPTHS .;RE [.[E,;SURED DEPTHS ([.ID) CmLESS UTHEP[I\lISE
[jCìTED.
2.
.;LL '.'ERTIC;'.L DEPTHS .:'.P.E TEUE '.~EETIC.~.L DEPTH (TI,.7D .
3 . I.ß'JD EUnS 1 [.: 2 t!JEP.E DIPECTIOIJ.:'.L IrnTH I'P.TURr..L G.:'J,II.L;
PPOBE (iJGP
UTILIZILTG SCIlTTILL.:;'TIOIT DETECTORS.
<-:l . LOG .:..lID DIGIT.::'.L D.:;'T.~. OlTL'l- \,'JEP.E SHI fTED TO .:..
SCHLUHBEP.GEP. C.::'.SED-
HOLE G':'J.II.E p~r.:.L LOG P.U1I 11,1 UPS-15 OIT 2"7' J.::'JTU':'.P.J.- 2002.
LO(3 HE.r.,DEP
D,:...r,:.. PET.:;'IlT ()FIGIIL~.L DEPTH R.EFEPEI-IC ES .
5 . UWD PTJlTS 1 &. 2 REPEESEIIT WELL llPS -15 WITH
API#:50-029-23061-00.
THIS [¡1JELL RE,;CHED .:.. T()T':'.L DEPTH ('I'D) Of o.! '794' 110
-4582' T':'D.
SF.OP = S[,IOOTHED P~:'.TE OF PEllETP_~.TIOIT t!,jHILE DEILLIlIG.
SGED = S["IOOTHED lJATUP_:'.L G.r.J"IIL~. p_:.:; COI-IBIHED.
$
File Header
Ser.:ice name............ .STSLIE.OOl
Ser..ice Sub Le'.-eI Uame...
','ersion Uurnber. . . . . . . . . . .1.0.0
Date of Generation...... .02 03 21
l-Iaxirnum Ph~'sical P.ecord.. 65535
File T~ 'Pe. . . . . . . . . . . . . . . . LO
Pre"ions File IJame...... .STSLIB.OOO
Comment P.ecord
FILE HE.~.DER
FILE IEJUEEP.:
EDITED ¡,IER.GED [T~\ID
Depth shifced and
DEPTH IlJCREUEUT:
#
F I L E S Ul.II.E-I.P.l.
PBD TOOL CODE
GR
POP
$
1
clipped cUr',,"es; all bit ru.ns merged.
.5000
ST.~.RT DEPTH
76.5
139.0
STOP DEPTH
.:J:73-l.0
.:J:i'9-l.0
tt
B.:'.SELIUE CiJR\'E rOp. SHI rTS :
CURVE SHIFT DATA (MEASUPED DEPTH)
- - - - - - - - - EQUI\".;LEtJT UlJSHIFTED DEPTH - - - - - - - --
B;'.SEL IITE
";'6.5
167.0
188.5
211.0
218,5
228.0
2..19.0
299.0
30..1.5
311.5
328.0
DEPTH
GR
76.5
167.0
188.5
211.5
219.0
22""7.0
250.0
297.5
302.5
309.5
325.5
336.0 33<4..0
3.J7.5 345.0
351.0 350.5
387.0 385.5
..J08.0 40:.5
..J.l 5 . 5 .J1.J.5
.J30,5 ..129.5
...1:36.0 .,135.5
..J58.0 .J.57.0
..J61.5 .,161.5
..J6.J.0 -!63.0
..J,";,4.5 .,17.,1.0
490.5 .:190.5
..J97.5 -!97.5
523.5 523.0
533.5 534.0
:,.,10.0 539.5
5.J-!.O 5.J.:l.0
5:,0.5 550.5
556.5 556.0
5"70.5 5:0.5
5 -;' 8.0 5"78.0
585.5 585.0
633.0 631.5
659.0 653.0
678.0 67 ï' .0
693.5 691.5
-:'08.5 707.5
720.5 719.0
-:'33.0 731.0
-:'.:12.5 7.:11.0
-, 5 3 . 5 751.5
~-::'1 I: "761.0
' t. L . ..)
~66.0 763.5
781.0 779.5
"794.0 792.0
813.5 811.0
8~O.5 816.5
826.5 823.0
836.0 833.0
843.5 841.0
846.5 8.:.13.5
8:,";"' . 5 855.0
863.5 861.0
:::"73.5 81'0.5
e90.1) 887.5
E99.5 896.5
925.5 923.0
951.5 9.J.9.0
9ï2.0 970.5
9E:1.0 979.0
1002.0 999.5
1005.5 1003.0
1(11.:.1.5 1012.5
1(1:,7.0 1055.5
1062.0 1059.5
108--1.0 108:::.5
1091.5 1089.0
1094,(1 1092,0
1111.0 1108.5
11~,ï'. 5 1135.0
1143.5 11--11.0
1160.0 1157.5
11"7--1,5 1172.5
1216.5 1213.0
1~52.0 1249.0
1259.0 1255.5
1282.5 12"78.0
1293.0 1288.0
1396.0 1392.5
10.169.5 1.J68.0
1499.5 1.J98.0
1:,0..1.5 1503.0
1531.0 1529.0
1533.0 1531.0
1:,.,10.5 1538.5
1578.0 15-:--::.0
1598.5 1597.5
1615.0 1614.5
1640.0 1639.0
16;'3.0 1671.0
1729.0 1726.0
1764.0 1761.0
1/';'1.5 1"769.0
1"789.0 1"785.5
1843.5 18.J0.0
1860.5 1856.0
18"71.5 186:'.0
1903.0 1898.5
19..,15.0 1942.0
19"79.0 1976.0
2021 . 0 2018.5
203..1.0 2029.0
20.J.J.O 2040.0
2056.0 2055.0
2095.0 2092.0
212--1.0 2121.5
2131.5 2127.5
2150.0 2148.5
2159.5 2157.0
220-4.5 2201.0
2220.5 2216.5
2260.0 2255.5
22-:-'8.5 2273.0
2314.5 2310.5
2349.0 23--18.0
2384.5 2383.0
2402.5 2399.5
2.:169.5 2.J6.J.5
2520.0 2516.0
25..14.5 2541.0
2547.0 25.c!3.5
2556.5 2553.0
2:,66,0 2561.0
2~,95.5 2591.5
2600.0 2595.5
2619.0 2615.5
2625.0 2620.5
2635.0 2630.0
26.J.J.0 2639.5
2660.0 2657.0
2698.0 2696.5
2-:'15.5 2-:-' 11.5
2--:' 2 ú. 5 2716.5
2-23.0 2-:'18.:,
2-:-65.0 2762.0
2-:-'72. (I 2ï66.5
2777.5 2773.0
2827.0 2823.0
2c:40.5 2836.0
2355.5
2868.5
2909.5
2933.0
2969.0
297~.O
3021.0
302--1.5
3037.5
3090.0
3093.5
3099.5
3113.0
3125.0
3167.5
3181.5
3188.5
3195.0
3218.0
3221.5
3225.0
3236.0
32--!2.0
3256.0
3262.0
3265.0
32"70.5
321'8.5
328.:1.0
3293.5
3318.0
3328.5
3335.0
33.49.0
3352.5
3360.5
33-;''-1.0
3381.0
3384.0
3387.0
3398.5
3.,109.0
3.,122.5
3.,129.0
3.,151.0
3.,1"71.5
3.,187.5
3-:195.5
3522.5
35~6.5
3535.0
35..,15.0
3552.0
3589.5
3625.5
3649.5
3661.5
36"70.0
3709.5
3718.0
3721.0
]725.5
3732.0
3760.5
3766.5
2852.0
286--1.0
2905.0
2929.5
2966.0
2968.5
3017.5
3020.5
3033.0
3086.0
3090.0
3095.5
3108.5
3119.0
3163.0
3176.5
3186.5
3191.0
321--1.5
321"7.0
3221.0
3232.5
3238.5
3253.0
3258.5
3262.5
3267.5
32í5.5
3280.0
3290.5
3315.0
3325.5
3331.5
3345.5
3350.5
335,8.0
3370.0
3378.0
3383.0
3385.0
3396.5
3--107.5
3""¡21.0
3427.5
3--1--18.0
3..169.0
3..,185.0
3--193.0
3518.5
3523.0
3531.5
35--11.0
3548.5
3585.5
3621.5
3646.5
3658.0
3668.0
3706.5
371..,1.5
3-;'18.5
31'22.5
3729.5
3756.5
376--1.0
S'6C:Sr
O'TTSt
O"SOSt
S.9Stt
O'C:.tt
0'9Stt
O'6ttt
O.6£:tt
S.9£:pt
O'6Gtt
S'STt't
0'S6Et
S'r~tt
S'':'Stt
O.tSEt
S'ctEt
S'9é:tt
O'S2:tt
S"LT£t
S'TTt:t
S'96ct
S'£8GP
O'ESer
S.TtGt
O'Occt
S'9TGP
S'TTct
O'TOct
0.t6Tt
0'68Tt
O'G~Tf."
O'99Tf'
S'SSTt
O'C:tTt
O'£TTt
S'60Tt
S'OOTt
S'r60t
O'~80t
0'T80t
0'8S0t
O.~tOt
S'c.t:Ot
S.TcOt
O"f'TOt
0'900t
0'~S6£
O.t86t
S'C:86£
O'896£:
S'396E
S'9SG!::
S'St6t:
S'Of'6£
S'Tt:6t:
S'806£:
S'006£:
S'C88t:
O'9i.8t:
S'ES8E
O.t:t8£:
0.0<:8£:
O.66LE
S'08L£:
0.89':'£
S'tESt
S'9TSt
S'OTSt'
O'T6rt
S.~¿,tt
S'T9tt
O'£:Stt
C;'(f'tt
S.Ottt
S. U:tt
O'Oc:tt
O.66t:t
0.6~tt
S'T9',::1'
S.~S[t
O'Lf':::1'
O'Üttt
S'8(;[r
S'Të:[t
S'SlU'
O'OOtt
O'98~P
O'9Së:t
S"SE~f7
'; . f' (; ,~ v
O.6T::Þ
S"STGv
O'[OGP
S'S61Þ
O'T61Þ
O.t~Tt>
O'69Tt
S'T91f.>
O'S[Tf'
S'9TT'r
O'tTIp
S.t:OTv
S'':'60f;
S'680f>
S.t80t
O'T90f¡
S"OSOfï
S . S -¿() t-
O.t-COf7
O'~Ti)fï
S'600fï
S'066£
S'':'86£:
0'986£:
S'1L6£:
S.t'96£:
O"096[
S' ~r()t:
O' t:t'6E
S'(t6E
O'TT6£:
S'(:06£:
S.t88E
0'6L8£
S'9S8E
O"StSE
S'Ic8£:
S'c08E
S.t8.:.£:
O'I':'L£
4563.0
45,'6.5
4611.0
4626.5
4648.0
~668.0
46ì4.5
4676.5
4686.0
4696.0
4:02.5
4;94.0
$
-1558.0
.J5"71.5
.1605.5
..,1622.0
.J6':1:2.0
.J663.0
.J669.0
.J671.5
.J6ì9.5
.J69.J.5
-1"705.5
-1-:-'97.0
#
¡.IEEGED
PBU
UÍlv D
LIÍlvD
S
D.c...T.c... SOUP.C £
TOOL CODE
BIT RUlI 1-10 UEP.GE TOP
1 ~6.5
2 2514.0
HEP.GE B.è...SE
251.1.0
-1~9ì.O
#
P.El-bEt:S :
ilEP.GED iL::'.11I P.::"SS.
$
#
Data Format Specification Record
Data Record TJ'pe. . . . . . . . . . . . . . . . . .0
Data Specification Block Type.....O
Logging Direction.......... . .. . .. . Down
Optical log depth units.......... .Feet
Data Reference Poine............. .Undefined
Frame Spacing.................... .60 .1111
[.Iax frames per record. . . . . . . . . . . . . Undefined
.:'.bsent ':a1\le..................... .-999
Depth Uni ts. . . . . . . . . . . . . . . . . . . . . . .
Datum Specification Block sub-e~1)e...0
[lame Ser.- ice Order Units Size Usam Pep Code Offset Charmel
DEPT FT .J 1 68 0 1
F()P UWD FT H 4 1 68 .J 2
GP [.rvJD .:'.PI -1 1 68 8 3
First Lase
ilame Ser:ice Unit Uin ¡.lax i.lean lTsam P.eadinçr P.eading
DEPT fT 76.5 .Ji9.J 2<-135.25 9436 76.5 4"79..4
ROP I'TInJD FT H 0.5 2200.72 2.J3.6.J1 9311 139 4794
Gp. HWD .::'.P1 5.94 179.49 79.02-15 9316 76.5 -1"7'34
First Reading For Entire File......... .:6.5
Last £eading For Entire File. . . . . '.' . . ..J79.J
File Trailer
Ser':ice name. . . . . . . . . . . . . STSL1B. GO 1
Sec:ice Sub Le':el IJame...
'/ersion iJumber. . . . . . . . . . .1.0. I)
Date of Generation...... .02 03 21
['Iaximum Physical Pecord. .65535
F i 1 e T:/];:)e, . , , , . . , . . . . . . . . LO
IJext File I'Jame.........,.STSL1B.OO2
Ph~'s i ca 1 EC)F
F i Ie Heac1er-
Ser':ice name............ .STSLIB.OO2
Service Sub Le"el LJarne...
'/ersion l'Tumber.......... .1.0.0
Dace of Generation...... .02 03 21
Uaximum Ph~'sical Record. .65535
File T:z.pe. . . . .. . . . . . . . . . . LO
pre:ious File lJarne...... .STSLIB.OO1
Cornment P.ecord
FILE HE.:'.DER
FILE IIUlIBEP.:
p~::'jnJ Ht'lD
Cur:es and log-
BIT RUn HUIIBEP.:
DEPTH UJCP.Er-IElTT:
#
FILE SUUIL:'.P.";
'.'ELIDOF. TC)(¡L C(,DE
GR
POP
$
2
header data for each bIt run in separate files.
1
.5000
ST';".P.T DEPTH
~'6. 5
139.0
STOP DEPTH
2-:1:52.0
251..],.0
#
LC'G HU".DEP. D,:".T,:'.
D;'.TE LOGGED:
SOFTl^J.:"'RE
SURF.;CE SC)FT\,^J.:'.P.E ',.YERSIOLT:
DO(ÑHHOLE SOFTí^J.::'.PE \7£F.SIOlT:
OAT.:'. TYPE (UEi.lOP\' OR. RE.~.L-TIUE) :
'I'D DRILLER (FT I :
TOP LOG HTTEP.'.".::'.L (FT):
BOTTOI.l LOG II iT EP.T.T;'.L (FT):
BIT P.01'ATIIIG SPEED (PPI.I):
HOLE INCLHr.:'.TIOlJ \ DEG
iUUHIiJH KlJGLE:
IL:''':': HJl1J..I ,:'JTGL E :
#
TOOL STRIi~ (TOP TO BOTTOM)
VEIIDOR TOOL CODE TOOL T7PE
iTGP n.r..TUPJ...L G.::'J.1i'L::'. PP.OBE
$
#
BOP.EH()LE .;.LID c.:'.SnTG 0.:'.'1'.:"-
OPEiJ H()LE BIT SI::::E (lIT):
DP.ILLEP.' S C.::"SII!G DEPTH (FT):
#
BOP.EHOLE COnDITIONS
nUD T'r'PE:
¡.IUD DEIISIT; \LB G) :
¡.IUD 'll SCOS IT'; (S):
HUD PH:
MUD CHLORIDES (PPH):
FLUID LOSS (C3):
RESISTI\tIT"; (OHi'1i'l) ':'.1' TEHPER.;TUP.E (DEGF)
l'1UD .:'.1' HE':'.SUP.ED TENPERATTJP.E (I-IT):
HUD ,:'.1' I'L:''':': CIPCUL.;'TIrJG TEPHPEP~;:'.TUF.E:
HUD FILTP"':'.1'E AT 1,11':
¡.IUD C,;F.E .;:',1' ¡.'IT:
#
UEUTP.O['J TOOL
¡.1;. l' P. I:': :
1.t;:'.1'R I:': DEIJS IT"; :
HOLE C:o.:::'P.PECTIOll I. It! :
It
2 3 - ,J ,:'J j - 0 2
Insite
0
Hemor~'
2519.0
113.0
2519.0
.j
30.9
TOOL I JLn.lB EP.
413
12.250
Spud I.Iud
9.30
100.0
7.5
900
18.4
.000
.000
.000
.000
.0
70.0
.0
.0
TO(IL ST.:'JTDûFF \ liT) :
B\7E FREQUEl-TCY \ H:) :
#
P.El-U".PJ:S :
...
....
1*
Data Format Specification Record
Da ta Record T~1Je. . . . . . . . . . . . . . . . . . 0
Data Specification Block T~'pe.....O
Logging DirectIon................ .Down
Optical log depth units.......... .Feet
Data Reference Point............. . Undefined
Frame Spacing.................... .60 .1IB
I'[a}~ frames per record............. Undef ined
.:'.bsen t '.-a 1 ue. . . . . . . . . . . . . . . . . . . . . . - 9 9 9
Depth Uni ts . . . . . . . . . . . . . . . . . . . . . . .
Datum Specification Block sub-t~'pe... 0
[Tame Ser "ice Order Onits Size lTsam Pep Code Offset Channel
DEPT FT -1 1 68 I} 1
P.()P l'\rm (I 1 (I FT H -1 1 68 .J 2
Gp. HilmO 11) .:.. P I .J 1 68 8 j
First Last
[fame Ser:ice Unit Hin [.¡ax I.lean Usarn Reading P.eadino;¡
DEPT FT ì6.5 251.J 1295.25 -1876 76.5 251.,1,
P.OP [.1WDO 1 0 FT'H 0.5 2200. ï'2 1"""'5.-l88 -1751 139 251.,1
GR HI'JDO 1 I) ;.. P I 22.-:'<-1 1¡9..J9 82.3191 ..J.752 "76.5 2--152
First Reading For Entire File......... .~6.5
Last Peading For Entire File.......... .251-l
File Trailer
Sep:ice name. . . . . . . . . . . . . STSLIB. 002
Ser:ice Sub LeHE: 1 IJame...
'Jersion lTumber.......... .1.0.0
Date of Generation...... .02 03 21
Uaximum Ph~/sical Pecord.. 65535
File Type..... .. ..... ... .LO
[jext File [jarne...........STSLIB.003
PhJ's ical EOF
File Header
Ser~ice name............ .STSLIB.003
Service Sub Le':el lJame.. .
',:'ers ion Hurnbe r. . . . . . . . . . . 1 . 0 . 0
Date of Generation...... .02 03 21
I'IaxirnuITl Ph:r'sical P.ecord.. 65:,35
File T~ -pE:. . . . . . . . . . . . . . . . LO
Pre:ious File Irame.......STSLIB.OO2
Cormnent P.ecord
FILE HE.;DEP.
FILE NUlIBEF.:
R;..1v t.nrm
Cur',:es and log
BIT RU1J Iful.ŒER:
DEPTH IIJCP.EHEITT:
3
header data for each bit run in separace files.
2
,5000
#-
FILE S UHIL:"'P. ï
'...'ElJDOR. TOC)L
Gp.
p.op
$
CODE START DEPTH
2..J,S2.5
2S1.J.5
STO!? DEPTH
..J,"73"7.0
-!~9-:- .0
#
L()G HEÞ.DEP. D.::'.T':'.
D,:c..TE LOGGED:
SOFTVJ.i:..RE
SUF.F.:"'CE SOFTlrI.:'.P.E '.'EP.S Icm:
DOvJIJHOLE SOFT\¡Ii->.F.E \'EF.SIon:
D;o.T.:'. T".LPE (HEUOP.:: OF. PE.:"L-TIUE) :
'I'D DP.ILLEP \ FT) :
TOP LOG I1ITEP.V.:"L (FT):
BOTTOU L()(; II TTEP.',~';L \ FT :
BIT P.OT.:"'TIIIG SPEED (P'Pll):
HOLE nICLIlJ.:',TIOlJ (DEG
UIlIIHuTI .:'J IGLE :
1.I;>~.: HIU1.I ,:'j'IGLE:
#
TOOL STP.IlIG (TOP TO BOTTC)I.j)
~:EITDOP TOOL CODE TOOL T'/I?E
UGP lL:'_TTJP~:'.L G.:'1.11 U". I?ROBE
...
."
#
BOF:EHOL£ .~JTD C.:'.SIlJG DAT,:',
OPElI HOLE BIT S1:£ (III I :
DPILLEP.' S C.::'.SIITG DEPTH (FT):
#
BOP.EHOLE COllDITIons
UUD riPE:
I.IUD DElTSITJ.' \ LB G) :
UUD "..'ISCOSIT": (S I :
UUD PH:
[.IUD CHLOPIDES (PPI.!):
FLUID LOSS (C3):
P.£SISTI',,"ITJ.' (OH[.IHI .::..1' TEl-IPEP_::"TUP.E (DEGF I
1-'1UD ,:','1' [.IE.::',SUP.ED TEUPEP_:'.TUP.E \ HT I :
[.IUD .:'.'1' I.U-.X CIFCUL;",TIl.JG TEPJIPEF~:'.TURE:
l-IUD FIL TP~::'.TE AT [.IT:
I,IUD C.:'XE .:'.T I.IT:
#
lJEUTP.OIJ TOOL
IL::"TP.I:': :
['L;TRI~': DEUSITJ.':
HOLE COP.P.ECTIOll \ Ill) :
#
TOOL ST;.j,JDOFF (Ill I :
EWP. FPEQUEHCY 1HZ):
#
p, EI.L:'.F.I-:S :
s
#
Daea Format Specification P.ecord
Daea Record T~"pe. . . . . . . . . . . . . . . . . .0
Data Specification Block T~~e.....O
Logging Direction.,.............. . Down
Ope lcal log depth uni ts. . , . , . . . . , . Feet
Data Feference POlne.,....,...... .Undefined
F r arne S pac l ng. . . . . . . . . , . . . . . . . . . , . 6 Û . 1 I t'j
Max frames per record............ .Undefined
¡:'.bsent ':alue...........,.......... -999
Dep t h Un its. . . . . . . . . . . . . . . . . . . . . . .
Datum Specification Block sub-t:'-"pe... 0
2 "7 - J ':'j', 1- 0 2
Insite
0
Uemory
47901.0
2519.0
479..,1.0
1.3
3..1.0
TOOL IIŒ,IBEP.
.113
8.500
\i,Ia ter
9.20
<-12.0
9.5
1100
6.ì
Based
.000
.000
.000
.000
.0
86.8
.0
. û
[Jame Ser:.~i ce Order iJnits Size Usam Pep Code Offsee Channel
DEP1' FT '¡ 1 68 0 1
P.()P HvvDO 2 (I FT H -l 1 6';:' .:! 2
u
I::; p. HlrW02 Ù .:"'PI .J 1 68 8 3
First Lase
1 J arne Ser: ice Unit Uin I.lax [.Jean lJsam P.eading P.eading
DEPT FT 2.J.52.5 .J.-;-'97 362.J.."75 .,1690 2.,152.5 .J."79"7
P.()P llVlD020 F1' H 8.-1--1 198.J..7.,1 31-1.101 .:.1566 251.,1.5 -1797
GF. U\¡IJD020 .;PI 5.9-1 137.38 75. ~'.J15 -15"70 2452.5 -1-'''''''''
. :) l
First Reading For Entire File......... .2.,152.5
Last Reading For Entire File..... .... . .-1797
File Trailer
Ser"ice name............ .STSLIB.OO3
Ser,'ice Sub Le~el []ame...
'.~ersion [.Jurnber........... 1 . Û. I)
Date of Generation...... .02 03 21
ITa:Ömum Ph~'sical "Record.. 65535
F i 1 e T~rpe. . . . . . . . . . . . . . . . LO
lTe:.~t File lJame. . . . . . . . . . . STSLIB. 00.;1
Ph~"s i ca 1 EQF
Tape Trailer
Se:c:ice name............ .LISTPE
Da t e. . . . . . . . . . . . . . . . . . . . . 02 03 21
Or ig in. . . . . . . . . . . . . . . . . . . S1'S
Tape Harne. . . . . . . . . . . . . . . . UlJFI10lrJU
Continuation LJumber..... .01
lJext Tape Uame. . . . . . . . . . . iJìJ!l._lJOlm,]
Comments................ .STS LIS
l,vr it i ng Libr a r~/ .
Scientific Technical Ser:ices
Reel Trailer
Ser'ice name.. . . . . . . . . . . . LISTPE
Da t e. . . . . . . . . . . . . . . . . . . . . 02 0 3 21
Orl.gin. . . . . . . . . . . . . . . . . . . STS
F.eel lJarne. . . . . . . . . . . . . . . . mTKlJOír1lj
Continuation lJumber..... .01
Uext Peel lJame. . . . . . . . . . . UlW.llOiJInT
Comments................ .51'5 LIS
Writing Library.
Sc ien t i fie Technical Ser: ices
Ph~"s ieal EOF
Ph~'s iea 1 EOF
End Of LIS Flle