Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout201-245CAUTION: This email originated from outside the State of Alaska mail system. Do not click links or open attachments unless you recognize the sender and know the content is safe. From:Wallace, Chris D (OGC) To:AOGCC Records (CED sponsored) Subject:FW: NOT OPERABLE: PWI MPS-15 (PTD 2012450) Missed 4-year MIT-IA Date:Tuesday, September 30, 2025 3:17:34 PM From: Stephen Soroka <steve.soroka@hilcorp.com> Sent: Tuesday, September 30, 2025 2:08 PM To: Wallace, Chris D (OGC) <chris.wallace@alaska.gov> Cc: Regg, James B (OGC) <jim.regg@alaska.gov>; Ryan Thompson <Ryan.Thompson@hilcorp.com> Subject: NOT OPERABLE: PWI MPS-15 (PTD 2012450) Missed 4-year MIT-IA Mr. Wallace PWI MPS-15 (PTD #2012450) is currently shut in and was not brought online for its scheduled 4-year MIT-IA that was due in September. The well is now classified as NOT OPERABLE and will remain shut in. A witnessed MIT-IA will be scheduled once the well is returned to injection. Please respond with any questions. Thank You. Steve Soroka Hilcorp Alaska LLC Field Well Integrity Steve.Soroka@hilcorp.com P: (907) 830-8976 Alt: Chris Casey The information contained in this email message is confidential and may be legally privileged and is intended only for the use of theindividual or entity named above. If you are not an intended recipient or if you have received this message in error, you are herebynotified that any dissemination, distribution, or copy of this email is strictly prohibited. If you have received this email in error, please immediately notify us by return email or telephone if the sender's phone number is listed above, then promptly and permanently delete this message. While all reasonable care has been taken to avoid the transmission of viruses, it is the responsibility of the recipient to ensure that theonward transmission, opening, or use of this message and any attachments will not adversely affect its systems or data. No responsibilityis accepted by the company in this regard and the recipient should carry out such virus and other checks as it considers appropriate. MEMORANDUM TO: Jim Regg P.I. Supervisor FROM: Matt Herrera Petroleum Inspector I Well Name MILNE PT UNIT S-15 Insp Num: mitMFH210926081155 Rel Insp Num: NON -CONFIDENTIAL State of Alaska Alaska Oil and Gas Conservation Commission DATE: Tuesday, September 28, 2021 SUBJECT: Mechanical Integrity Tests Hilcorp Alaska, LLC S-15 MILNE PT UNIT S-15 Src: Inspector Reviewed By.:p P.I.Supry 19'p — Comm API Well Number 50-029-23061-00-00 Inspector Name: Matt Herrera Permit Number: 201-245-0 Inspection Date: 9/25/2021 ✓ Packer Depth Pretest Initial 15 Min 30 Min 45 Min 60 Min Well S-15 - - (Type Inj w -'TVD 4052 Tubing 1153 - 1154 1154 - 1154- ! -- T a ----s-PT^Test s>lI ----- _ = I_AL1 as 1500---� 1112-t2 -1 -837 lsoo�179 s BBPumped: 0.4 13131, Returned 0.4 OA 0 0 - 2 Interval 4YRTST P/F �y _ { --- - P Notes: MIT -IA Performed to 1800 PSI Per Operations Tuesday, September 28, 2021 Page 1 of I Debra Oudean 80Alaska, LLC 3 GeoTech 38000 Centerpoint Drive, Suite 1400 Anchorage, AK 99503 Tele: 907 777-8337 na,•,,t Ah,.t:,,t.LL E-mail: doudean@hilcorp.com DATE 10/04/2019 To: Alaska Oil & Gas Conservation Commission Natural Resource Technician 333 W 7th Ave Ste 100 Anchorage, AK 99501 Halliburton INJECTION PROFILE 20 AUG 2019 CD 1: L MPU S-15i_IPROF_20AUG19 9'13/20191:55 PM PDF Documt MPU S-15i_IPROF 20AUG19_DN40 9!13/20191:56 PM LAS File MPU S-15i_IPROF 20AUG19_DN80 9/13/20191:56 PM LAS File ® MPUS-15i_IPROF 2OAUG19_img 9/13,120191:56 PM TIFF File MPU S-15i_[PROF_20AUG19 POOH 9'13120191:56 PM LAS File MPUS-15i_IPROF 20AUG19 RIH 9/13.!20191:56 PM LAS File MPU_S-15i_IPROF 20AUG19_SS444D 9/13.+20191:56 PM LAS File MPU S-15i_IPROF 20AUG19_SS4940 9'13/20191:56 PM LAS File MPUS-15i_IPROF_20AUG19SS4480 9,113/20191:56 PM LAS File MPUS-15i_IPROF_20AUG19_SS4520 9113120191:56 PM LAS File MPU S-15i_[PROF 20AUG19 SS4560 9/13/20191:5613M LAS File MPU S -15i IPROF 20AUG19_UP40 9173,,120191:56 PM LAS File MPU S-15i_[PROF _ZOAUG19_UP80 9'13/2D191:56 P14 LAS File MPU S-15i_IPROF_28AUG19_UP120 9/13✓20191:56 PM LAS File Please include current contact information if different from above. 261245 31299 Please acknowledge receipt by siping and returning one copy of this transmittal or FAX to 907 777.8337 Received By: JAI � , / //n,, / /I I Date: • • MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission TO: DATE: Thursday,September 21,2017 Jim Regg P.I.Supervisor ` S a ((7 SUBJECT: Mechanical Integrity Tests HILCORP ALASKA LLC S-15 FROM: Chuck Scheve MILNE PT UNIT S-15 Petroleum Inspector Src: Inspector Reviewed By: P.I.Supry �J Dpi NON-CONFIDENTIAL Comm Well Name MILNE PT UNIT S-15 API Well Number 50-029-23061-00-00 Inspector Name: Chuck Scheve Permit Number: 201-245-0 Inspection Date: 9/18/2017 Insp Num: mitCS170918142725 Rel Insp Num: Packer Depth Pretest Initial 15 Min 30 Min 45 Min 60 Min Well S-15 " Type Inj W' TVD 4052 Tubing 1173 1173 - 1173 - 1173 - PTD 2012450 Type Test SPT Test psi 1500 - IA 505 2104 - 2025 - 2021 - BBL Pumped_ I BBL Returned_ 0.8 OA ' --_8— 8 7 7 Interval 4YRTST p/F P Notes: SCANNED FEB 2018 Thursday,September 21,2017 Page 1 of 1 Imagl -- roject Well History File Cover ~~e XHVZE This page identifies those items that were not scanned during the initial production scanning phase. They are available in the original file, may be scanned during a special rescan activity or are viewable by direct inspection of the file. 7J;-- PAGE COUNT MATCHES NUMBER IN SCANNING PREPARATION: ~ - NO DA TE;! if () lj-/SI vY\ P IF NO IN STAGE 1, PAGE(S) DISCREPANCIES WERE FOUND: I - YES - NO (1 Q J- - Q..1..þ? Well History File Identifier Organizing I"n l' ~ RESCAN 0 Two-Sided D~ITAL DATA \£ Diskettes, No. ~ 0 Color items: 0 Grayscale items: Other. NofType 0 0 Poor Quality Originals: 0 Other: NOTES: BY. BEVERLY ROBIN VINCENT SHER'((~~WIND~' Project Proofing BY. BEVERLY ROBrr~ VINCENT SHERY~IND'( Scanning Preparation ~ X30=&n BY BEVERLY ROBIN VINCENT SHERY~IND ( Production Scanning Stage 1 PAGE COUNT FROM SCANNED FILE: BY: BEVERLY ROBIN VrrJCENT SHERYL~IND'( Stage 2 B (: BEVERL'( ROBlfJ VINCENT SHER'(L MARIA WIND'( (SCAWMI(\ IS COI.IPlE1E Ar IHIS 1'01111 UPllESS SPEC'''l A IIEIIIIO/ IS REQUIRED Ol AlII/IDIVlDUAL PAGE BASIS DUE 10 QUAlIlY, GRMSCAlE OR COLOR IMAGES) ReScanned I/llIf' r,;',. ,/ /,'1/ . I -'I''''' 1,11,'1/, ":/'1'1/ '.1,,1'1"'//:" I,''''II'I',I!,,','' Ii} RESCANr~ED B.(: BEVERLY ROBIN VINCENT SHERYL MARIA WINDY General Noles or Comments about Ihis file: 0 Rescan Needed OVERSIZED (Scannable) 0 Maps: 0 Other items scannable by large scanner OVERSIZED (Non-Scannable) 0 Logs of various kinds Other V11,j 0 DATEftJ I/ÓIf 151 DA.TE:~" i t'Lf Isl VI1~ + / ,~r; = TOTAL PAGES 7,Ç r11!J DA1E./J , O~ Is! DATE: 1st DATE: /s/ Quality Checked '''''"''¡ .................- .....-........ • • MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission DATE: Monday,September 23,2013 TO: Jim Regg "pt,4 01/3ó143 P.I.Supervisor 1 ( SUBJECT: Mechanical Integrity Tests BP EXPLORATION(ALASKA)INC S-15 FROM: John Crisp MILNE PT UNIT SB S-15 Petroleum Inspector Src: Inspector Reviewed By: P.I.Supry j fie-- NON-CONFIDENTIAL Comm Well Name MILNE PT UNIT SB S-15 API Well Number 50-029-23061-00-00 Inspector Name: John Crisp Permit Number: 201-245-0 Inspection Date: 9/18/2013 Insp Num: mitJCr130923092852 Rel Insp Num: Packer Depth Pretest Initial 15 Min 30 Min 45 Min 60 Min T Weill S-15 TIType Inj r w 21TVD 1 4052 I IA 1 58 1 2770 2668 - 2661 - 1 1--- 1 1 1 PTDdi 2012450 ' LType Test r SPT 1Test psi 15°° 'I OA 1 12 , 13 , 13 13 . 1 7 I A Interval i4YRTST . P/F 1 P ' Tubing 680 . 680 • 680 680 1 ._, Notes: 1.4 bbls pumped for test. %WED n TZ ri Monday,September 23,2013 Page 1 of 1 • bp BP Exploration (Alaska) Inc. Attn: Well Integrity Coordinator, PRB -20 Post Office Box 196612 Anchorage, Alaska 99519 -6612 AiqNED FEB 2 4 2012 December 30, 2011 Mr. Tom Maunder Alaska Oil and Gas Conservation Commission 333 West 7 Avenue Anchorage, Alaska 99501 PS i 5 Subject: Corrosion Inhibitor Treatments of MPS -Pad Dear Mr. Maunder, Enclosed please find multiple copies of a spreadsheet with a list of wells from MPS -Pad that were treated with corrosion inhibitor in the surface casing by conductor annulus. The corrosion inhibitor is engineered to prevent water from entering the annular space and causing external corrosion that could result in a surface casing leak to atmosphere. The attached spreadsheet represents the well name, API and PTD numbers, top of cement depth prior to filling and volumes of corrosion inhibitor used in each conductor. As per previous agreement with the AOGCC, this letter and spreadsheet serve as notification that the treatments took place and meet the requirements of form 10 -404, Report of Sundry Operations. If you require any additional information, please contact me or my alternate, Gerald Murphy, at 659 -5102. Sincerely, ri ) Mehreen Vazir BPXA, Well Integrity Coordinator . • , 1 1 BP Exploration (Alaska) Inc. Surface Casing by Conductor Annulus Cement, Corrosion inhibitor, Sealant Top-off Report of Sundry Operations (10 -404) MPS -Pad 10/11/2011 Corrosion • Vol. of cement Final top of Cement top off Corrosion inhibitor/ Well Name PTD # API # Initial top of cement pumped cement date inhibitor sealant date ft bbls ft gal MPS-01A 2070340 50029231410100 0.25 NA 0.25 NA 5.1 9/6/2011 MPS-02 2031270 50029231690000 2.5 NA 2.5 NA 23.8 7/30/2011 MPS-03 2021460 50029231050000 Open Flutes - Treated MPS-04 2030520 50029231480000 1.7 NA 1.7 NA 17.0 7/30/2011 MPS -05 2021370 50029231000000 Open Flutes - Treated MPS-06 2031090 50029231630000 1.7 NA 1.7 NA 17.0 7/30/2011 MPS-07 2020720 50029230790000 1 NA 1 NA 13.6 11/3/2009 MPS-08 2031230 50029231680000 1.3 NA 1.3 NA 10.2 7/30/2011 MPS-09 2020200 50029230670000 0.5 NA 0.5 NA 5.1 11/32009 MPS -10A 2051250 50029231520100 1.3 NA 1.3 NA 11.9 7/29/2011 MPS-11 2021130 50029230920000 1 NA 1 NA 10.2 7/29/2011 MPS-12 2030230 50029231390000 0.6 NA 0.6 NA 6.8 7/29/2011 MPS -13 2021240 50029230930000 1 NA 1 NA 11.9 11/3/2009 MPS -14 2031040 50029231620000 1.8 NA 1.8 NA 22.1 7/29/2011 `'� MPS-15 2012450 50029230610000 9.6 NA 9.6 NA 88.4 7/31/2011 MPS -16 2030650 50029231510000 1.2 NA 1.2 NA 10.2 7/29/2011 MPS -17 2021730 50029231150000 Open Flutes - Treated MPS-18 2022420 50029231330000 1.3 NA 1.3 NA 11.9 7/29/2011 MPS -19A 2022330 50029231210100 1.8 NA 1.8 NA 23.8 7/29/2011 MPS-20 2022410 50029231320000 1.3 NA 1.3 NA 11.9 7/29/2011 MPS-21 2020090 50029230650000 1.8 NA 1.8 NA 22.1 11/3/2009 MPS-22 2031470 50029231760000 9.1 NA 9.1 NA 83.3 728/2011 MPS-23 2021320 50029230980000 Open Flutes - Treated MPS-24 2030380 50029231420000 1.3 NA 1.3 NA 10.2 7/28/2011 MPS -25 2021030 50029230890000 Open Flutes - Treated MPS -26 2030610 50029231500000 1 NA 1 NA 8.5 7/28/2011 MPS-27 2020850 50029230840000 0.9 NA 0.9 NA 8.5 7/28/2011 MPS -28 2030940 50029231580000 1.1 NA 1.1 NA 11.9 7282011 MPS -29 2021950 50029231190000 Open Flutes - Treated MPS-30 2022360 50029231310000 1.2 NA 1.2 NA 11.9 7/28/2011 MPS -31 2020140 50029230660000 Open Flutes - Treated MPS-32 2030920 50029231570000 0.8 NA 0.8 NA 6.8 7282011 MPS -33A 2061720 50029231230100 1 NA 1 NA 6.8 7/28/2011 MPS-34 2031300 50029231710000 6 NA 6 NA 49.3 7/28/2011 MPS-35 2031430 50029231750000 1.2 NA 1.2 NA 11.9 7/28/2011 MPS -37 2070520 50029233550000 13.9 Need top job NA MPS-39 2081830 50029234050000 0.7 NA 0.7 NA 4.3 8/18/2011 MPS -41A 2081610 50029234010100 Sealed NA NA NA NA NA MPS-43 2081760 50029234040000 Dust Cover NA NA NA 6.8 10/11/2011 MPS -90 2051350 50029232760000 0.6 NA 0.6 NA 3.4 9/6/2011 MPSB -04 500299990799 0.6 NA 0.6 NA 3.4 7/30/2011 . . MICROFILMED 07/25/06 DO NOT PLACE ANY NEW MATERIAL UNDER THIS PAGE F:\LaserFicbe\CvrPgs _Inserts\Microfilm _ Marker. doc ~ g t/ltt-) ~.. \..> í) U DATA SUBMITTAL COMPLIANCE REPORT 4/29/2004 "-. ~,/L À ^ J w"'- )'Ù (: .;. Permit to Drill 2012450 Well Name/No. MILNE PT UNIT SB S-15 Operator BP EXPLORATION (ALASKA) INC MD 4797 -- TVD 4585-- Completion Date 4/28/2002'-- Completion Status 1 WINJ Current Status 1WINJ API No. 50-029-23061-00-00 <:0¿'~'') -- --------- --------- -------- - ------ - --. --- -- ---- - -- - - --- ------ -- --- --------------- ---- - --- -- --- ---- -- - - ---- --- --. ------- REQUIRED INFORMATION - --- - - ----- --------- -------- ------- ------- - --- ------ Directional Survey "~ 'Y ~:~ Mud Log No Samples No ----------- -------------- --------- DATA INFORMATION Types Electric or Other Logs Run: Well Log Information: RES/AIT, DT/BHC, CNL. LDL, GR. Caliper, SP, MRES, DEN, NEU, D (data taken from Logs Portion of Master Well Data Maint) Log/ Electr Data Digital Dataset Log Log Run Interval OH/ Type Med/Fnnt Number Name Scale Media No Start Stop CH Received Comments [EO--- - ---- --- --- ---- -- D 10670 LIS Verification 1 76 4734 Open 4/4/2002 (..Rpt 10670 LIS Verification 76 4734 Open 4/4/2002 LiD C 10622 Sonic 1,2 100 4802 Open 3/5/2002 GeD C 10968 See Notes 1 113 4794 Open 7/10/2002 Digital Log Images ---- ---_ ! -- -------- Well Cores/Samples Infonnation: Cuttings Interval Start Stop 110 4758 Sent Received Sample Set Number Comments 1 055 ...-;..-~ Î I - __I Name -------------- --------- -------- ----- --- - ---- --- -- Well Cored? ADDITIONAL INFORMATION G)N ç \....,~- L ~ ~.... t,./ Daily History Received? ci)N ... ~/N Chips Received? --¥-+-N-- Formation Tops Analysis Received? (bN ----- -- ------ -_.--- - ---.--------------- ------- Comments: ~om~ij~~~e ;e:i::e~ ~y~~- ~lJ ~~-----~- - ~-- - - --- ----- --- ------ -------- Date: _2_ll~~- ÀlJ~_:;¡ MECHANICJ~ INTEGRITY P~PORT '...... Cë.si~g: '\ _:.:¡e:- : ~} t\ Shoe: :'.Joi:-".g: ~\(;;, Packe::- \...\dto~ till ~ole S~ze 1's\Id- ê.nå Nt\- l/;xra-;;>-ÇJ OPER & FIELD .~V v\,\\\c ?O\"\- 4{~~~~~ - ¡.¡ELL NUMBER \J\y S - \ ç \.ï:XJ\-d-Lt5) TD: ,--\~\,HJ), ~S<65 TVD; ?3TD: ~\\) ~ H1? "-\'-\~ \ TV}) Shoe: 4.'ì.)r<6tm TVD i DV: ~~ l1D tJ~ '.'IVTI :: ? U D D -~- ::::: : : :~ ~ G [\ E :.., .:: ;..:: ~: . .~!:.LL DAT.?- MD TVD¡ :CF: HD : ",,-D Perf;:; "'S~~ ~S ~ <p ~~C)~ L-\.5 ~ 3> to TVD i See ê. L: ~5" ~ ~Cr.ÞJ~:C;'..L l:NTEGRITr - ?.A..RT f I Þ_nnü.ltls ?ress Test: ::? 'J5r'lj I 15 U1in2>~dS i 30 min c)'-\).S-. Co=ents: ~ \ T 'Ñ'\h,e,:>s~ ~l <:"'''-..)(')~~~~W: ,",(yO ~ ~ :ŒCRÞ..NIC¡'~ INTEGRITY - PART 42 ~ 4\<0 \:>'a\~ ", \ ~Q c:...\ ,L..J\~ ~c;;..) C e!l1en t: Volumes :"" Þ..mt. Line.r ~ ~ i Cs g ; DV 'N C\ . CwC -JO 1 to cove~ perf S dd- b~ \ ~ <:....~ f'l'C.C'\.-\- ~\. ~\<3.e.~ \- ~ c1)\JC\" ?rc.v\'S f(\'-J":> '500' "i:heorecical TOe CJ:~~~-\-Ò,t..~\o..~~ \0 ;';"~"~C'1ë CemeTI.t Bond Log (Yes or No) '{Q'.~ ; ~n AOGCC File 'i.<ë" CEL =:vc.luation, ;:.one ;;'Dove perfs ("=>/ro-O"), ') ~"", ,",-\at ~ <:A~ \t--~~\ss~~ ~\-~:cl \k\'(\\\.~\~e~~ Proàuc.tion Log: TY1Je i Evale.õ.tion CONCLUSIONS: ? art: n: t-\ r "\s C0<i: ""Of'-.> '""^ \ftCJ. M¡: \:~ \~(f.'w*m:ïJY1 \ '{J.¡;'6-O~ ? ë.r :: : z : MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission TO: Randy Ruedrich ~ Commissioner /' (j I.: ~\Î.J~ SUBJECT: Mechanical Integrity Test THRU: Tom Maunder /)~~\~~ BPX P.I. Supervisor MPU S Pad DATE: April 7 2003 FROM: Chuck Scheve Petroleum Inspector NON. CONFIDENTIAL Well 5-15 Type Inj. 5 P.T.D, 201-245 Type test P Notes: Well 5-30 Type Inj. 5 P.TD, 202-236 Type test P Notes: Well Type Inj, P.TD. Type test Notes: Well Type Inj, P.TD, Type test Notes: Well Type Inj, P.TD, Type test Notes: Type INJ, Fluid Codes F = FRESH WATER INJ, G = GAS INJ, S = SALT WATER INJ, N = NOT INJECTING Packer Deplh Pretest Initial 15 Min. 30 Min, T,V.D, 4053 Tubing 1425 1425 1425 1425 Interval I Test psi 1013 Casing 1150 2500 2425 2425 P/F f T.V.D. 4060 Tubing 1450 1450 Tesl psi 1015 Casing 550 2500 TV.D. Tubing Test psi Casing T,V.D, Tubing Test psi Casing T.V.D. Tubing Test psi Casing Type Test M= Annulus Monitoring P= Standard Pressure Test R= Internal Radioactive Tracer Survey A= Temperature Anomaly Survey D= Differential Temperature Test "/' 1450 1450 Interval I 2400 2400 P/F f Interval P/F Interval P/F Interval P/F ....' Interval 1= Initial Test 4= Four Year Cycle V= Required by Variance W= Test during Workover 0= Other (describe in notes) Test's Details I traveled to BPXs MPU 5 Pad and witnessed the initial MlI on wells 5-15 and 5-30, pressures were observed and found to be stable. The pressure tests were then perfonned demonstrating good mechanical integrity. M.I.T.'s performed: ~ Attachments: MIT report form 5/12/00 L.G. Number of Failures: .Q The pretest tubing and casing for 30 minutes with both wells Total Time during tests: 2 hours cc: MIT MPU S Pad 4-7-03 CS.xls 4/18/2003 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG Revised 02/18/03, Start Injection 23. CASING SIZE 20" 1. Status of Well 0 Oil 0 Gas 0 Suspended 0 Abandoned 181 Service 2. Name of Operator BP Exploration (Alaska) Inc. 3. Address P.O. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 3323' NSL, 136' WEL, SEC. 12, T12N, R10E, UM At top of productive interval 4294' NSL, 201' WEL, SEC. 12, T12N, R10E, UM X = 565801, Y = 6000962 10. Well Number At total depth 4302' NSL, 196' WEL, SEC. 12, T12N, R10E, UM X = 565805, Y = 6000970 11. Field and Pool 5. Elevation in feet (indicate KB, OF, etc.) 6. Lease Designation and Serial No. Milne Point Unit / Schrader Bluff KBE = 73.20' ADL380109 12. Date Spudded 13. Date T.D. Reached 14. Date Comp., Susp., or Aband. 1/22/2002 1/27/2002 4/28/2002 17. Total Depth (MD+TVD) 18. Plug Back Depth (MD+TVD) 19. DirectionaLSurvey 4797 4585 FT 4703 4491 FT \k. .EL Yes R'No 22. Type Electric or Other Logs Run RES / AIT, DT / BHC, CNL, LDL, GR, Caliper, SP, MRES, DEN, NEU, DSI CASING, liNER AND CEMENTING RECORD SETTING DEPTH HOLE Top BOTTOM SIZE 35' 112' 42" 35' 2499' 12-1/4" 32' 4788' 8-1/2" ~~!;..~.:. ," . r. ,~ ~'JZl> ~ ~,.....~; I~J :¡ ,-.. ¡ , ,. .- r:- ~';~.'_.. - ':': " Classification of Service Well Water Injection 7. Permit Number 201-245 302-132 8. API Number 50- 029-23061-00 9. Unit or Lease Name Milne Point Unit X = 565875, Y = 5999991 MPS;t5i .s - \ 5" 15. Water depth, if offshore 16. No. of Completions Nt A MSL One 20. Depth where SSSV set 21. Thickness of Permafrost N/A MD 1800' (Approx.) 9-5/8" WT. PER FT. 92# 40# 26# GRADE H-40 L-80 L-80 CEMENTING RECORD 260 sx Arctic Set (Approx.) 501 sx Class 'L', 225 sx Class 'G' 249 sx Arctic Set I, 225 sx Class 'G' AMOUNT PULLED 7" 24. Perforations open to Production (MD+ TVD of Top and Bottom and interval, size and number) 2-1/2" Gun Diameter, 4 SPF MD TVD SIZE 3-1/2", 9.3#, L-80 TUBING RECORD DEPTH SET (MD) 4303' PACKER SET (MD) 4264' 25. MD TVD 4523' - 4543' 4576' - 4596' 4311' - 4331' 4364' -4384' 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED Freeze Protected with 75 Bbls of Diesel. 27. Date First Production January 19, 2003 Date of Test Hours Tested PRODUCTION TEST Method of Operation (Flowing, gas lift, etc.) Water Injection PRODUCTION FOR OIL-BBL TEST PERIOD GAs-McF WATER-BBL CHOKE SIZE GAS-OIL RATIO Flow Tubing Casing Pressure CALCULATED Press. 24-HoUR RATE OIL-BBL GAs-McF WATER-BBL OIL GRAVITY-API (CORR) 28, CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips. See Attached. - ....." I \- ~ Form 10-407 Rev. 07-01-80 -'~"S 8Fl C¡:I: I 1.1,' - I Submit In Duplicate 29. Geologic Markers 30. Formation Tests Marker Name Measured Depth True Vertical Depth Include interval tested, pressure data, all fluids recovered and gravity, GOR, and time of each phase. Top of Schrader Bluff OA 4519' 4307' Top of Schrader Bluff C 4547' 4335' Top of Schrader Bluff OB 4574' 4362' 31. List of Attachments: 32. I hereby certify that the ~going is true ~d correct to the best of my knowledge Signed son~é--:~:k Title Technical Assistant Date Oé3--[ ß ()S M PS-15i 201-245 302-132 Prepared By Name/Number: Sandra Stewman, 564-4750 Well Number Permit No. / Approval No. Drilling Engineer: Steve Campbell, 564-4401 INSTRUCTIONS GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. ITEM 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection. salt water disposal. water supply for injection, observation. injection for in-situ combustion. ITEM 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments, ITEM 16 AND 24: If this well is completed for separate production from more than one interval (multiple completion). so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced. showing the data pertinent to such interval. ITEM 21: Indicate whether from ground level (GL) or other elevation (OF. KB. etc.). ITEM 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. ITEM 27: Method of Operation: Flowing. Gas Lift, Rod Pump. Hydraulic Pump. Submersible. Water Injection. Gas Injection, Shut-In, Other-explain. ITEM 28: If no cores taken, indicate 'none', Form 10-407 Rev. 07-01-80 Ò,OI-ë;A L/ S IOCJfofS '''ELL LOG TRt\NSMITTAL To: State of Alaska Alaska Oil and Gas Conservation Comm. Attn.: Lisa Weepie 333 West 7th Avenue, Suite 100 Anchorage, Alaska 99501 July 08, 2002 RE: MWD Formation Evaluation Logs - MPS-15, AK-Ml\1-220 15 l\IPS-15: Digital Log Images: 50-029-2306] -00 1 CD Rom PLEASE ACKNOWLEDGE RECEIPT BY SIGNrNG AND RETURNING THE ATTACHED COPIES OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: Spell)'-Sun Drilling Services Ann: Rob Kalish 6900 Arctic Bh'd. Anchorage, Alaska 995 I 8 BP Exploration (Alaska) Jnc, Petro-technical Data Center LR2-] 900 E, Benson Blvd, Anchorage, Alaska 99508 Date: Sign&-~ RECE\VED JUL 1 ~~ Z002 Al ska Oil & Gas Cons. Comnuss\oo a And\orage STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1. Status of Well 0 Oil 0 Gas 0 Suspended 0 Abandoned 181 Service 2. Name of Operator BP Exploration (Alaska) Inc. 3. Address P.O. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 3323' NSL, 136' WEL, SEC. 12. T12N, R10E, UM , '-'..~ At top of productive interval " ~)! ~'..: . 4294' NSL, 201' WEL, SEC. 12, T12N, R10E, UM . .7f-2i/~ 10. Well Number At total depth ~" , '" ,-,' ' 4302' NSL, 196' WEL, SEC. 12, T12N, R10E, UM ..." - L".~, . 11. Field and Pool 5. Elevation in feet (indicate KB, OF, etc.) 6. Lease Designation and Serial Nò~ ' Milne Point Unit 1 Schrader Bluff KBE = 73.20' ADL380109 12. Date Spudded 13. Date T.D. Reached 14. Date Comp., Susp., or Aband. 1/22/2002 1/27/2002 4/28/2002 17. Total Depth (MD+TVD) 18. Plug Back Depth (MD+TVD) 19. Directional Survey 4797 4585 FT 4703 4491 FT Ia Yes 0 No 22. Type Electric or Other Logs Run RES 1 AIT, DT 1 BHC, CNL, LDL, GR, Classification of Service Well Water Injection 7. Permit Number 201-245 302-132 8. API Number 50- 029-23061-00 . Unit or Lease Name Milne Point Unit MPS-15i 15. Water depth, if offshore 16. No. of Completions NI A MSL One 20. Depth where SSSV set 21. Thickness of Permafrost NIA MD 1800' (Approx.) 23. CASING SIZE 20" 9-5/8" 7" WT. PER FT. 92# 40# 26# GRADE H-40 L-80 L-80 Caliper, SP, MRES, DEN, NEU, DSI CASING, LINER AND CEMENTING RECORD SETTING DEPTH HOLE Top BOTTOM SIZE CEMENTING RECORD 35' 112' 42" 260 sx Arctic Set (Approx.) 35' 2499' 12-1/4" 501 sx Class 'L', 225 sx Class 'G' 32' 4788' 8-1/2" ,249 sx Arctic Set I, 225 sx Class 'G' AMOUNT PULLED 24. Perforations open to Production (MD+ TVD of Top and Bottom and interval, size and number) 2-1/2" Gun Diameter, 4 SPF MD TVD SIZE 3-1/2", 9.3#, L-80 TUBING RECORD DEPTH SET (MD) 4303' PACKER SET (MD) 4264' 25. MD TVD 4523' - 4543' 4576' - 4596' 4311' - 4331' 4364' -4384' 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED Freeze Protected with 75 Bbls of Diesel. 27. Date First Production Not on Injection Date of Test Hours Tested PRODUCTION TEST Method of Operation (Flowing, gas lift, etc.) NIA PRODUCTION FOR OIL-BBL TEST PERIOD GAs-McF WATER-BBL CHOKE SIZE GAS-OIL RATIO Flow Tubing Casing Pressure CALCULATED Press. 24-HoUR RATE 28. CORE DATA ,~-- :.~ ;..'. :'~ ' ',; C ~-~, ." .', ,'~. . Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or 'water: 'Submit'core chips. OIL-BBL GAs-McF WATER-BBL OIL GRAVITY-API (CORR) See Attached. .l:,!:).~~'~~l t;:, -. ~-\, ." I \,. -.,' :L:~I I~ :"~U! . ,4n'::lùr':t:'8 Form 10-407 Rev. 07-01-80 (" '\ ,.", , J ,1/ J'¡ V,I d ~ (~, ;; -;., j ,~~:\ ~ ',--,,'i ~. ~L- R B D M S B F L Mt ç f: .?;~~bmit In Duplicate 29. Geologic Markers 30. Formation Tests Marker Name Measured Depth True Vertical Depth Include interval tested, pressure data, all fluids recovered and gravity, GOR, and time of each phase. Top of Schrader Bluff OA 4519' 4307' Top of Schrader Bluff C 4547' 4335' Top of Schrader Bluff OB 4574' 4362' ,J 'I , ' ':. ,\ - . r : . ~ ..' \. .- ." " '. . ;, ~ I ... I ...:. ~ , .~ ~ ,;'.'.l;1t.::r:,.,. ;;~".: ~.: L- [,I ';:,~,';.'~, ',. \: 31, List of Attachments: Summary of Daily Drilling Reports, Surveys, Leak-Off Test Summary, Post Rig Work Summary and a Core Analysis Results. 32. I ~erebY certify that the fo~oin~ is true and correct to the best of my knowledge Signed Terne Hubble ~Q ÂA.l..ß ~ ~ Title Technical Assistant MPS-15i 201-245 302-132 Well Number Permit No. I Approval No. Sidewall Date 0 $- ~ :<.: O~ Prepared By Name/Number: Sandra Stewman. 564-4750 INSTRUCTIONS GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska, ITEM 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection. observation, injection for in-situ combustion. ITEM 5: Indicate which elevation IS used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. ITEM 16 AND 24: If this well is completed for separate production from more than one interval (multiple completion). so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27, Submit a separate form for each additional interval to be separately produced. showing the data pertinent to such interval. ITEM 21: Indicate whether from ground level (GL) or other elevation (DF. KB, etc.). ITEM 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. ITEM 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, Other-explain. ITEM 28: If no cores taken, indicate 'none'. Form 10-407 Rev. 07-01-80 ~-~, BP Alaska File No. : 57111-02020 -.!\ MPS-15i [ore Lab Milne Point Field Sidewall Core Analysis Results Sample Depth Perm. Porosity Saturations Grain Description Method No. Kair Oil I Water I Total I O/w Density ft md 0.' 0, O' 0 Ratio glee '0 .0 ,'0 .0 4172 fg-mg ss some heavy oil (Iar) 4229 fg-mg ss no smell 4289 fg-mg ss no smell 4297 fg-mg ss no smell 4306 fg-mg ss no smell 4321 ss slty fg 4327 clyst sli slty 4403 good ss fg-mg no oil smell 4405 190, 30,8 32.9 64.5 97.4 0,51 2,64 Sd brn vf-Igr slty dk stn gld flu OS 4407 good ss fg-mg no oil smell 2 4409 264. 31.1 28.4 67,0 95.4 0.42 2,63 Sd brn vf-fgr sslty dk sIn gld flu OS 4411 good ss fg-mg no oil smell 4433 fg ss no oil smell 4447 fg ss no oil smell 4449 slty vfg ss argil 4519 ss fg better quality wI oil slaining 4521 slty vfg ss 4523 slty vfg ss 3 4525 3.57 26,3 29.4 66,3 95,7 0.44 2,69 Sd tan vfgr vslty cly m stn gld flu OS 4527 slty vfg ss 4529 vfg-Ig ss oil slained nice sand 4 4531 7.55 28,1 19.6 77.4 97.0 0.25 2,83 Slllllan-gry vfgr sdy lam vcly m slrk stn gld flu OS 4533 argil sltsllo slty clyst 4535 slty ss argil 5 4537 9.45 30.1 35.5 64.1 99.6 0,55 2.73 Sd brn vfgr slty scly dk sIn gld flu OS 4539 argil sltsl to vfg ss 4541 argil sltsl to vfg ss 4543 argil sllsl 4545 slty clysl 6 4575 30,8 31.5 30.7 66,9 97.6 0.46 2,66 Sd brn vfgr slty scly dk stn gld flu OS 4577 argil sltst '\ BP Alaska File No. : 57111-02020 MPS-15i "":..' Milne Point Field ÚJre Lab Sidewall Core Analysis Results Sample Depth Perm. Porosity Saturations Grain Description Method No. Kair Oil I Water I Total I OIW Density ft md 01 O' O' 01 Ratio glee ,0 10 '0 .0 7 4579 5.58 29.0 21.7 77.8 99,5 0,28 2.70 Sd brn vgfr vslty cly m stn dgld lIu OS 4580 argil sltst to vfg ss 8 4582 2.24 27.3 13,3 85.6 98.9 0.16 2.67 Sd brn vgfr vslty cly m stn dgld lIu OS 4584 argil sltst - 9 4586 4.98 30,3 16.6 83,2 99,8 0.20 2,69 Sd It brn vfgr vslty cly m stn dgld flu OS 4588 slty clyst 10 4590 0.969 26,2 12,0 78.7 90.7 0.15 2.72 Sh It lan-gry vslty It sptd stn dgld flu OS 4592 vfg ss to sltst argil 11 4594 1.43 26.5 17,5 74,3 91.8 0.24 2,73 Sltst tan scly m stn dgld flu DS 4596 MO slty clyst 12 4598 3.80 27,2 18,8 77,0 95,8 0,24 2,68 SlIst tan-gry vfgr sdy cly m strk stn dgld flu OS 4600 MO slty clyst 4667 MO slty clyst 4669 MO slty clyst Legal Name: MPS-15 Common Name: MPS-15 Test Date 1/25/2002 1/26/2002 0 FIT Test Type Test Depth (TMD) (ft) 2,534.0 (ft) BP EXPLORATION Leak-Off Test Summary Test Depth (TVD) (ft) 2.479.0 (ft) AMW (ppg) 8.60 (ppg) Surface Pressure (psi) 500 (psi) Leak Off Pressure (BHP) (psi) 1,608 (psi) Page 1 of 1 EMW 12.48 (ppg) 12.48 (ppg) PrInted 2/4/2002 10 32 11 AM BP EXPLORATION Page 1 of 5 Operations Summary Report Legal Well Name: MPS-15 Common Well Name: MPS-15 Spud Date: 1/22/2002 Event Name: DRILL +COMPLETE Start: 12/28/2001 End: 1/29/2002 Contractor Name: NABORS Rig Release: 1/29/2002 Rig Name: NABORS 27ES Rig Number: 27E Date From - To Hours Activity Code NPT Phase Description of Operations 1 118/2002 00:00 - 03:30 3,50 MOB P PRE BLOW DOWN - PICK UP AND CLEAN UP CELLAR - PREP RIG FLOOR FOR MOVE 03,30 - 09:00 5.50 MOB P PRE MOVE OUT PUMP, PIT, MOTOR. PIPE SHED COMPLEX - OPEN UP CELLAR DOORS 09:00 - 14:00 5.00 MOB P PRE MOVE SUB OFF WELL MPF-90 - LINE UP FOR MOVING - MOVE TIRES IN - ATTACH TONGUE STIFF ARMS - LOAD DRLG LINE SPOOL ONTO TRUCK 14:00 - 0,00 MOB P PRE MOVE PITS, MOTOR COMPLEX - SUB BASE TO Y @ MILNE POINT - CHECK ON WEATHER CONDITIONS - 30MPH WIND - +50 BELOW CHILL FACTOR - DRIFTING SNOW - I PHASE 2 IN GPB I KUPARUK - PHASE 1 MILNE PT - S PAD i FILLED WITH DRIFTING SNOW HIGH WINDS CAN NOT I LAY HERULlTE FOR RIG 1/19/2002 100:00 - 01 :30 1.50 MOB P PRE LEFT SUB MODULE AT MILNE PT "Y" BECAUSE OF THE WEATHER CONDITIONS AT THE TURN ON S-PAD - POOR VISIBIL TY, DRIFTING SNOW. HIGH WINDS - CON'T MOVING PUMP ROOM MODULE FROM THE "Y" TO S-PAD 01 :30 - 03:00 1.50 MOB P PRE RETURN TO F-PAD - RIG UP PIPE SHED SECTIONS FOR TRANSPORT TO S-PAD 03:00 - 05:00 2.00 MOB P PRE MOVE PIPE SHED'S FROM F-PAD TO S-PAD 05:00 - 10:00 5.00 MOB P PRE LAY COMPOSITE MATS OVER PIPE LINE ENTERING S-PAD ROAD - PREPARE TO MOVE SUB MODULE - WAITED ON WEATHER DUE TO HIGH WINDS POOR VISIBILITY 110:00 - 15:30 5.50 MOB P PRE MOVE SUB MODULE FROM "Y" TO TURN OFF TO S-PAD ROAD - CON'T MOVE SUB AROUND TURN AND DOWN ROAD TO S-PAD LOCATION - EDGE OF S-PAD ROAD VERY NARROW AND SOFT - AS RIG MADE TURN ONTO S-PAD ROAD SHOULDER ON APPROACH WAS SOFT AND STARTED TO SLIDE 15:30-18:00 2 50 MOB P PRE TAKE DRLG LINE SPOOL OFF TRUCK - REMOVE TONGUE - SPREAD TIRES 18:00 - 21 :00 3.00 MOB P PRE SPREAD HERCULlTE - SET MATTING BOARDS - PUSHERS CAMP-GENERATOR SHOPS 21.00 - 22:30 1.50 MOB P PRE SPOT SHOP - CAMP - GENERATOR - JACK SUB UP PREPARE TO MOVE ON WELL S-15i 22:30 - 00:00 1.50 MOB P PRE HOOK UP CATS BEGIN TO MOVE ONTO WELL 1/20/2002 00:00 - 01 :00 1.00 MOB P PRE FINISH SPOTTING SUB OVER WELL S- 151 01 :00 - 03:30 2.50 MOB P PRE LAY OUT MATTS FOR PIPE SHED AND SPOT 1ST SECTION 03:30 - 06:30 3.00 MOB P PRE LA Y OUT MATTS FOR PITS. SPREAD HERCULlTE - SPOT PIT MODULE - LAYOUT MATTS FOR MOTOR MODULE 06:30 - 08:00 1.50 MOB P PRE SET MOTOR MODULE 08 00 - 09:00 1.00 MOB P PRE SET PUMP MODULE 09:00 - 10:00 1.00 MOB P PRE SET 2ND PIPE SHED MODULE 10:00 - 22.00 12.00 MOB P PRE HOOKING UP ALL SERVICE LINES TO ALL MODULES - SET 22.00 - 00:00 I PIPE SHED TIOGA - FIRE BOILERS GET STEAM THOUGH OUT RIG 2.00 MOB P PRE NIPPLE UP SURFACE RISER - DIVERTOR 1/21/2002 0000 - 04.30 4 50 RIGU P PRE NIU DIVERTOR SYSYEM (ANNULAR) INSTALL 4" VALVE'S ON CONDUCTOR 04:30 - 07 30 3.00 I RIGU P PRE NIU DRLG NIPPLE - FLOW LINE - SERVICE LINES IN HALLWAY 07 30 - 11 :00 3 50 RIGU P PRE INSTALL KNIFE VALVE - DIVERTOR LINE Pr,ntH :!/4/20ü2 1 I) 32 21 AII.,' BP EXPLORATION Page 2 of 5 Operations Summary Report Legal Well Name: MPS-15 Common Well Name: MPS-15 Spud Date: 1/22/2002 Event Name: DRILL +COMPLETE Start: 12/28/2001 End: 1/29/2002 Contractor Name: NABORS Rig Release: 1/29/2002 Rig Name: NABORS 27ES Rig Number: 27E Date From - To Hours Activity Code NPT Phase Description of Operations 1/21 12002 11 :00 - 16:00 5,00 RIGU P PRE PICK UP TOOLS - CLEAN RIG - PREP RIG FLOOR FOR PICKING UP DRILL PIPE AND BHA -INSTALL TURNBUCKLES - CENTER RISER 16:00 - 17:00 1.00 RIGU P PRE WARM UP TOP DRIVE - TEST HYD FUNCTIONS - PJSM FOR PICKING UP DRILL PIPE WHILE WARMING UP TOP DRIVE 17:00-19:30 2,50 RIGU P PRE PICK UP SINGLES 5" DRILL PIPE FROM SHED - DRIFT EACH JOINT PICKED UP 19:30 - 20:00 0.50' RIGU P PRE PRE SPUD MEETING WITH CREW 20:00 - 00:00 4,00 RIGU P PRE CON'T PICKING UP 5" DRILL PIPE FROM SHED 1/22/2002 i 00:00 - 02:00 2.00 RIGU IP PRE PIU 5" DRILL PIPE FROM PIPE SHED ! 02:00 - 03:30 1.50 RIGU P PRE FUNCTION TEST DIVERTOR SYSTEM - ACCUMULATOR SYSTEM - ALL OPERATIONAL 03:30 - 05:00 1.50 RIGU P PRE SURFACE TEST EOUIPMENT - TEST MUD LINES I PUMPS TO 3500 PSI OK - CIRC MUD THROUGH SYSTEM - ALL OPERATIONAL 05:00 - 06.00 1.00 DRILL P SURF LOAD PIPE SHED WITH BHA - ARRIVED ON LOCATION AT 03:30 HRS 06:00 - 06:30 0.50 DRILL P SURF HELD PRE SPUD MEETING WITH DAY CREW 06:30 - 09:30 3.00 DRILL P SURF P/U BHA - WASH FROM 109' TO 112' 09:30 - 11 :00 1.50 DRILL P SURF SPUD WELL AT 09:30 HRS - DRILL FROM 112' TO 193'- i RPM 70 - GPM 395 - PP 1100 - TO 2K - WOB 10K TO 15K 11:00 -11:30 0.50 DRILL P SURF PULL BACK TO 95'- FINISH PIU BHA 11 :30 - 00:00 12,50 DRILL P SURF DRILL FROM 193' TO 1159' - WOB 30K TO 35K - RPM 85 - GPM 500 - PP 1650 - TO ON BTM 4K TO 5K - TO OFF BTM 2K TO 3K - PU 95K SO 95K ROT 95K - GRAVEL SIZE ON S-PAD BIGGER THEN NORMAL AT MILNE PT - (SOME THE SIZE OF A FIST) 1/23/2002 00:00 - 15:00 15.00 DRILL P SURF DIRECTIONAL DRILL FROM 1159' TO 2514' - WOB 35 - RPM 85 - GPM 500 - PP 1650 - TO 3K - 4K - PU 11 OK - ON 105K - ROT 110K HYDRATE GAS TO SURFACE 2021' - NO ISURF PROBLEMS - MUD CUT 9.3 TO 9.1 1500 - 15:30 0.50 DRILL P CBU - 3800 STKS - CONDITION MUD 1530 - 17:30 2.00 DRILL P SURF PUMP OUT TO 1200' - POOH TO HWDP - HOLE IN EXCELLENT CONDITION - NO OVER PULLS NOTED 17.30 - 18:30 1.00 DRILL P SURF RIH TO TD 2514' - HOLE IN EXCELLENT CONDITION - NO TIGHT SPOTS SEEN 18.30 - 20.00 1.50 DRILL P SURF CBU TWO TIMES 8000 STKS - MONITOR WELL - WELL STATIC - PUMP DRY JOB - BLOW DOWN TOP DRIVE I MUD LINES 20:00 - 21 :00 1 00 DRILL P SURF POOH TO HWDP - NO TIGHT SPOTS SEEN - HOLE IN EXCELLENT SHAPE 21 :00 - 23:00 2.00 DRILL P SURF PULL TWO STANDS HEVI-WEIGHT STAND BACK - LAY DOWN JARS I TWO JOINTS HEVI- WT - STAND BACK 6 STANDS HEVI-WT - LAY DOWN REST OF BHA - BREAK BIT - TAKE BEND OUT OF MOTOR - FLUSH MOTOR 23.00 - 00:00 1.00 DRILL P SURF CLEAR FLOOR - CLEAN FLOOR - PJSM ON RIGGING UP AND LOGGING WITH SCHLUMBERGER 1/24/2002 00.00 - 01 :00 1 00 DRILL P SURF RIG UP SCHLUMBERGER - PIU PEX/AIT/GR/DEN/NEU/DSI TOOLS 01 00 - 05.30 4.50 DRILL P SURF RUN WIRE LINE LOGS - TRIPLE COMBO TOOL - FROM BTM CONDUCTOR 112' TO TD 2514' - NO PROBLEMS LOGGING HOLE Pr,nlea 2/4/2002 1() 32 21 AM BP EXPLORATION Page 3 of 5 Operations Summary Report Legal Well Name: MPS-15 Common Well Name: MPS-15 Spud Date: 1/22/2002 Event Name: DRILL +COMPLETE Start: 12/28/2001 End: 1/29/2002 Contractor Name: NABORS Rig Release: 1/29/2002 Rig Name: NABORS 27ES Rig Number: 27E Date From - To Hours Activity Code NPT Phase Description of Operations 1/24/2002 05:30 - 06:30 1.00 DRILL P SURF RIG DOWN SCHLUMBERGER LOGGING EQUIPMENT 06:30 - 07:00 0.50 CASE P SURF PJSM ON RIGGING UP CASING EQUIPMENT 07:00 - 08:00 1.00 CASE P SURF RIG UP 9 5/8" CASING EQUIPMENT 08,00 - 08:30 0.50 CASE P SURF PJSM ON RUNNING 9 5/8" CASING 08:30 - 12:00 3.50 CASE P SURF RAN 60 JOINTS OF 9 5/8" L-80 BTC 40# CASING - NO HOLE PROBLEMS - LAND ON HANGER - SHOE @ 2499' - FLOAT COLLAR @ 2416' - 15' RA THOLE BELOW SHOE - LAY DOWN CASING EQUIPMENT 12:00 - 13:00 1.00 CASE P SURF CIRC BTM'S UP WITH FRANKS CIRC TOOL - STAGING UP TO 8 BPM AT 500 PSI - GOOD RETURNS - NO LOSSES 13:00 - 13:30 0.50 CASE P SURF LAY DOWN FRANKS FILL UP TOOL - RIG UP CMT HEAD - REGAIN CIRC @ 8 BPM AT 500 PSI 13:30 - 14:00 0.50 CASE P SURF PJSM ON CEMENTING AND DISPLACING CEMENT - TRANFERING FLUIDS 14.00 - 18:00 4.00 CASE P SURF PUMP 5 BBLS WATER - TEST LINES TO 3000 PSI - 45 BBLS OF WATER - 50 BBLS ALPHA SPACER @ 10.2 PPG WITH RED DYE IN THE FIRST 20 BBLS PUMPED @ 3 BPM I 500 PSI - DROP BTM PLUG AFTER 45 BBLS SPACER PUMPED - PUMP 370 BBLS 10,7 PPG LEAD CEMENT @ 5 BPM I 800 PSI- FOLLOWED BY 46 BBLS OF 15.9 PPG TAIL @ 3 BPM I 300 PSI - DROP TOP PLUG - DISPLACE WITH 30 BBLS WATER FROM HOWCO - 153 BBLS MUD WITH RIG @ 8 BPM I 800 PSI - BUMP PLUG WITH 1800 PSI - 1000 PSI OVER CIRC PSI - HELD FOR 1 MIN - RELEASE PRESSURE - FLOATS HELD - 80 BBLS OF 10.7 PPG CEMENT TO SURFACE 18:00 - 20:00 2.00 CASE P SURF FLUSH RISER I FLOW LINE - BLOW DN LINES - BACK OUT LANDING JOINT - CLEAR FLOOR OF CASING TOOLS - LAY DOWN LANDING JOINT 20:00 - 00:00 4.00 CASE P SURF NIPPLE DOWN DIVERTOR SYSTEM 1/25/2002 00.00 - 02:00 2.00 CASE P ¡SURF NIPPLE DOWN DIVERTOR SYSTEM 02:00 - 03.00 1.00 CASE P SURF NIU WELL HEAD FMC GEN 5 SYSTEM - TEST TO 1000 PSI FOR 10 MINS - OK 03:00 - 07:30 4.50 CASE P SURF NU BOP'S 07:30 - 09:00 1.50 DRILL P INTl BODY TEST BOP'S - DOOR SEAL LEAKING - BTM PIPE RAMS 09:00 - 11 :30 2.50 DRILL P INTl CHANGE OUT DOOR SEAL - BTM PIPE RAMS 11 :30 - 16:00 4.50 DRILL P INT1 TEST BOPS - ANNULAR - TOP RAMS - BTM RAMS - BLINDS - CHOKE MANIFOLD - KILL LINE - CHOKE LINE - FLOOR VALVES - TOP DRIVE IBOP UPPER - LOWER - 250 LOW 5 MINSI 2500 HIGH 5 MINS - PULL TEST PLUG -INSTALL WEAR RING - JOHN CRISP WITH AOGCC WITNESS THE TEST 16.00 - 17'00 1 00 DRILL P INT1 BLOW DOWN ALL TESTING EQUIPMENT - RIG DOWN SAME 17:00 - 18:00 1 00 DRILL P INn RIG SERVICE - TOP DRIVE SERVICE 1 8 00 - 21. 30 3 50 DRILL P INn PU - BIT - BHA 21.30 - 2330 2 00 DRILL P INn RIH WITH 5" DRILL PIPE - TAG UP AT 2413' - FIC 2415' 23 30 - 00 00 0.50 DRILL P INTl CIRC HOLE TO LEVEL OUT MUD WEIGHT FOR CASING TEST 1/26/2002 00.00 - 00.30 0.50 DRILL P INTl CIRC AND CONDITION MUD FOR CASG TEST 00.30 - 01 30 1.00 DRILL P INT1 R/U TO TEST 9 5/8" CASG - TEST 9 5/8" CASG FOR 30 MINS TO 2500 PSI - TEST GOOD Pr,nlt?d 2/4/2002 103221 AM BP EXPLORATION Page 4 of 5 Operations Summary Report Legal Well Name: MPS-15 Common Well Name: M PS-15 Spud Date: 1/22/2002 Event Name: DRILL +COMPLETE Start: 12/28/2001 End: 1/29/2002 Contractor Name: NABORS Rig Release: 1/29/2002 Rig Name: NABORS 27ES Rig Number: 27E Date From - To Hours I Activity I Code NPT Phase Description of Operations 1/26/2002 01 :30 - 03:00 1.50 DRILL P INT1 DRLG FLOAT EQUIPMENT AND 20' OF NEW HOLE TO 2534' - WOB 20 - RPM 60 - GPM 400 - PP 1500 - TQ 2K TO 4K 03:00 - 03:30 0.50 DRILL P INT1 CIRC AND CONDITION MUD - LEVEL OUT MUD WEIGHT - TO RUN FIT 03:30 - 04:00 0,50 DRILL P INT1 PREFORM FIT - MD 2534' - TVD 2479' - MUD WEIGHT 8.6- SURFACE PRESSURE 500 - EMW 12.48 - BLOW DOWN KILL LINE 04:00 - 10:30 6.50 DRILL P INT1 DIRECTIONAL DRILL FROM 2534' TO 3548' - WOB 30 - RPM 85 - TQ 6K TO 7K - GPM 450 - PP 1850 - PU 140 - SO 120- ROT 130 10:30 - 11 :30 1.00 DRILL P INT1 PUMP OUT 3548' TO 3059' - POOH FROM 3059' TO 2461' HOLE EXCELLENT - NO TIGHT SPOTS - NO SWABBING 11 :30 - 12:00 0.50 DRILL P INT1 RIG SERVICE - TOP DRIVE SERVICE 12.00 - 12.30 0.50 DRILL P INT1 RIH FROM 2461' TO 3548' - NO TIGHT SPOTS SEEN ON TRIP IN 12:30 - 00.00 11.50 DRILL P INT1 DIRECTIONAL DRILL FROM 3548' TO 4610' - WOB 30K TO 40K - RPM 70 - GPM 440 - PP 2050 - TQ 6K TO 7K - PU 165- SO 130 - ROT 150 - MAX GAS 3960 @ 4190' - FLOW RATE 33% TO 72% - NO PIT GAIN 1/27/2002 00:00 - 02:00 2.00 DRILL INT1 DRILL FROM 4,610' TO TD AT 4,758' - PUMPING 418 GPM , 1800 PSI, 30K WOB, 80 RPM, 1 OK TORQUE - NO LUBRICANTS USED WILL DRILLlNG- BASE OB SAND AT 4,598' 02:00 - 03:00 1.00 DRILL INT1 PUMP 10.5 PPG HI-VIS WEIGHTED SWEEP. SWEEP CAME BACK AT 3,360 STROKES. CONTINUE TO CIRCULATE FOR 3 BU, SHAKERS CLEAN. 03:00 - 06:00 3.00 DRILL INT1 FLOW CHECK - POOH F/4,758' TO 4,516' SWABBING WITH 25K OVERPULL - PUMP F/4,516' TO 4.044' - POOH F/4,044 TO 2.461' - NO PROBLEMS 06:00 - 06.30 0.50 DRILL INT1 SERVICE TOP DRIVE 06:30 - 08,00 1.50 DRILL INT1 TIH F/2.461' TO 4,758' - NO PROBLEMS 08:00 - 08.30 0.50 DRILL INT1 PUMP 10.5 PPG HIGH VIS WEIGHTED SWEEP - CIRCULATE AND CONDITION HOLE 08:30 - 09 30 1.00 DRILL INT1 DRILL FROM 4,758' TO 4,797' FOR PBTD RATHOLE 09:30 - 10:00 0 50 DRILL INT1 CIRCULATE AND CONDITION HOLE AT 4,797' 10:00 - 11 :30 1.50 DRILL INT1 MONITOR WELL - PULL 5 STANDS - PUMP DRY JOB & POOH - HOLE IN GOOD SHAPE 11 :30 - 14:00 2.50 DRILL INT1 LAY DOWN BHA 14:00 - 1430 0.50 DRILL INT1 PJSM WITH SHLUMBERGER PRIOR TO RU WIRELlNE EQUIPMENT 14:30 - 1500 0 50 DRILL INT1 RU SCHLUMBERGER - PIU PEX/AIT/GR/DEN/NEU/DSI TOOLS 15'00 - 20'00 5 00 DRILL INT1 RIH TAG BOTTOM AT 4.786' WIRELlNE MEASUREMENT- LOG 4.786 TO 9-5/8' CASING SHOE AT 2.499' - NO PROBLEMS LOGGING HOLE 20.00 - 23 00 3 00 DRILL INT1 RIH WITH 45 SIDEWALL CORES - SHOT 45, RECOVERED 45 2300 - 23:30 0 50 DRILL INT1 RIG DOWN SCHLUMBERGER LOGGING EQUIPMENT 23 30 - 00 00 0 50 DRILL INT1 R/U NABORS 200 TON CASING RUNNING EQUIPMENT 1/28/2002 00.00 - 01 00 1.00 CASE P COMP RIG UP NABORS 200 TON CASING TOOLS 01.00-0130 0.50 CASE P COMP SAFETY MEETING WITH DRILL CREW ON RUNNING 7" CASING Pr,nled 2W2002 10 32 21 AM BP EXPLORATION Operations Summary Report Page 5 of 5 Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: MPS-15 MPS-15 DRILL +COMPLETE NABORS NABORS 27ES Start: 12/28/2001 Rig Release: 1/29/2002 Rig Number: 27E Spud Date: 1/22/2002 End: 1/29/2002 Date From - To Hours Activity Code NPT Phase Description of Operations 1/28/2002 01 :30 - 05:00 3.50 CASE P COMP RUN 60 JTS 7" 26# L-80 BTC-MOD 2,418' 05:00 - 05:30 0.50 CASE P COMP CIRCULATE AND THIN MUD, 5 BPM 300 PSI- CIRCULATE ONE CASING VOLUME 05:30 - 08:00 2.50 CASE P COMP CONTINUE RUNNING 7" CASING - MAKE UP FMC 11 X 7" FLUTED MANDRELL HANGER - LAND CASING - RAN TOTAL 117 JTS 7" 26# L-80 BTC - MOD + 20' MARKER JT 4,752' SET AT 4788' - PBTD AT 4,703' 08:00 - 10:00 2.00 CASE P COMP CIRCULATE AND THIN MUD, STAGE UP TO 5 BPM 400 PSI, RECIPROCATE PIPE 15' STROKES - CIRCULATE TWO CASING VOLUME 10:00-10:30 0.50 CASE P COMP RIG DOWN FRANK'S FILL UP TOOL - RIG UP HALLIBURTON 7" CEMENT HEAD AND LINES 10:30-11:00 0.50 CASE P COMP CONTINUE CIRCULATE - PRE JOB SAFETY MEETING WITH DRILL CREW ON CEMENT JOB 11:00 - 13:30 2.50 CEMT P COMP TEST LINES 3000 PSI. PUMP 20 BBLS FRESH WATER AHEAD, FOLLOW BY 50 BBLS 10.2 PPG ALPHA SPACER. DROP BOTTOM PLUG, MIX AND PUMP 500 SX CLASS 'L' CEMENT, YIELD 4.15 CF/SX, 184 BBS SLURRY MIXED AT 10.7 PPG TAILED WITH 225 SX CLASS 'G' WI .2% CFR-3 + ,3 % HALAD 344, YIELD 1,1S CF/SX, 46 BBLS SLURRY MIXED AT 1S.8 PPG - WASH OUT CEMENT LINES, DROP TOP PLUG AND DISPLACE WITH 122 BBLS OF WARM DIESEL (3,18S') + 58 BBLS OF 8.6 KCL WATER - BUMP PLUG TO 800 PSI OVER - AVERAGE DISPLACE RATE 4.8 BBL/MIN - FULL RETURNS - 80 BBLS OF 10.7 PPG CEMENT TO SURFACE - RECIPROCATE PIPE UNTIL CEMENT AROUND SHOE- FLOAT HELD- CIP AT 1333 HRS 1/28/02 13:30-14:00 0.50 CEMT P COMP FLUSH OUT BOP AND FLOW LINE WITH WATER 14:00 - 21:00 7.00 CEMT P COMP OPEN DOORS AND EACH RAM OF BOP STACK AND FLUSH OUT WITH WATER. WASH BEHIND EACH RAM BLOCK - CLOSE DOORS 21 :00 - 22:30 1.50 WHSUR P COMP LAY DOWN LANDING JT. - CHANGE BAIL - PICK UP STAND OF HWT - INSTALL FMC 7" PACK-OFF - TEST PACK-OFF TO 5000 PSI 22:30 - 00:00 1.50 WHSUR P COMP INSTALL FMC FALSE TUBING HANGER BOWL WITH FMC 7" 'ISA' BPV - TEST BPV TO 1000 PSI - OK 1/29/2002 00:00 - 03:00 3.00 BOPSUR P COMP NIPPLE DOWN AND SET BACK 135/8" SOOO# BOP STACK 03:00 - OS:OO 2 00 WHSUR P COMP NIPPLE UP FMC 11" X 7 1/16 SOOO# HOLD DOWN ADAPTER FLANGE- TEST PACK-OFF TO SOOO PSI FOR 10 MINUTES - NIPPLE UP 7 1/16" SOOO# MASTER VALVE WITH TREE CAP AND GAUGE 05:00 - 06:00 1 00 EVAL P COMP RIG UP HB&R TO 7" CASING - PRESSURE TEST CASING TO 4S00 PSI WITH DIESEL FOR 30 MINUTES ON CHART- BLED TO 4400 PSI IN 30 MINUTES - OK 06.00 - 08:00 2.00 RIGD P COMP PICK UP TOOLS AND HOSES, CLEAN OUT CELLAR - RELEASE RIG AT 0800 HRS 1/29/02 Pr,nlp.O "2/.3/2002 103221 AM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: 4/25/2002 4/26/2002 BP EXPLORATION Operations Summary Report MPS-15 M PS-15 COMPLETION NABORS NABORS ~ ~~~ Page 1 of 1 Start: 4/26/2002 Rig Release: Rig Number: 2iIii.i-4 €.~ Spud Date: End: 4/26/2002 Date From - To Hours I Activity Code NPT Phase Description of Operations 10.00 - 18.00 18:00 - 19:00 19.00 - 20:30 20:30 - 22:00 22.00 - 00:00 00:00 - 03:00 03:00 - 04:00 ! 04:00 - 08:00 ! 08:00 - 12:30 I I 12:30 -13:00 13:00 - 14:30 14:30 - 15:30 15:30 - 16:00 16:00 - 18.30 18:30 - 20:30 20:30 - 22:00 8.00 RIGU P 1.00 WHSUR ¡ P ! 1.50 BOPSUR P 1.50 BOPSURP PRE CaMP CaMP ¡CaMP ICOMP CaMP CaMP 2.00 CASE P 3.00 CASE P 1.00 KILL P 4.00 PULL P 4.50 RUNCOI\tP CaMP CaMP 0 50 RUNCOI\tP 1.50 BOPSURP 1.00 WHSUR P 0.50 I WHSUR P 2.50 I CHEM P CaMP CaMP CaMP CaMP CaMP 2.00 DHEQP P CaMP 1.50 WHSURIP CaMP Mil RU AND SAFE OUT EQUIPMENT. CHECK PRESSURE ON WELL & PULL TWC & SET BPV & ¡ NIPPLE DN TREE. NIPPLE UP BOP TEST BOP TO 250 LOW & 2500 HIGH. (TEST WAIVED BY CHUCK SHEVE WITH AOGC. ) LOAD PIPE SHED WITH TBG. & STRAP SAME. RIH WITH 3.5" TBG. & MULE SHOE TO 3500' CIRC FREEZE PROTECTION FROM WELL BORE TO TIGER TANK WITH 8.5 PPG. SEA WATER. POOH LAYING DN 3.5" TBG. RIG UP & RIH WITH BAKER "S-3" PKR. TO SETTING DEPTH 4275' MU HANGER & LAND SAME & RILDS, & SET TWC. NIPPLE DN BOP NIPPLE UP TREE. PRESSURE TEST TREE & EQUIPMENT TO 5000 PSI. RIG LINES & TEST & PUMP 65- BBL. SEA WATER TREATED WITH 1- BBL. COREXIT & FOLLOW WITH 75 BBL. DIESEL DOWN ANNULUS & U-TUBE TO TBG. FOR FREEZE PROTECTION. DROP 1-5/16" BALL & SET PKR. TO 4000 PSI. ON TBG.. & HOLD FOR 30-MIN & BLEED TBG. TO 1500 PSI. & PRESSURE ANNULUS TO 3000 PSI. & HOLD FOR 30-MINUTES. ALL TEST OK. SET BPV & RIG DOWN TEST EQUIPMENT & SECURE TREE AREA. P"nlea 4/30/2002 31433 PM Well: Field: API: Permit: MPS-15 Milne Point Unit / Schrader Bluff 50-029-23061-00 201-245 POST RIG WORK 04/28/02 MIRU ELINE, RIH WITH 2.5" 2506 PJ HMX GUN, PERF 4576-4596, RIH WITH 2ND GUN, PERF 4523- 4543, WHP AFTER INTIAL PERF 250 PSI, WHP AFTER 2ND GUN 0 PSI, RDMO. AOGCC 333 W. 7th Ave. Suite 100 Anchorage, AK 99501 Definitive Re: Distribution of Survey Data for Well MPS-15 Dear Dear Sir/Madam: Enclosed are two survey hard copies and 1 disk Tie-on Survey: Window / Kickoff Survey Projected Survey: 0.00' MD , MD (if applicable) 4,797.39' MD Please call me at 273-3545 if you have any questions or concerns. Regards, William T. Allen Survey Manager Attachment(s) RECEIVED FEB 0 7 2002 AIa8ka Oil & Gas Cons. Comrni88to.. Ana'KIage 62;67 ~ ¿; t./ S 06-Feb-02 BP EXPLORA TION (ALASKA) INC. Milne Point Unit Alaska Drilling & Wells MPS-Pad Dev Working, Slot MPS-15 MPS-15 Job No. AKZZ22015, Surveyed: 27 January, 2002 SURVEY REPORT 7 February, 2002 Your Ref: 500292306100 Surface Coordinates: 5999991.03 N, 565874.93 E (70024'37.4977" N, 149" 27'48.9462" W) Surface Coordinates relative to Project H Reference: 999991.03 N, 65874.93 E (Grid) Surface Coordinates relative to Structure: 20.18 N, 469.91 W (True) Kelly Bushing: 73.20ft above Mean Sea Level spe.-..-.y-sul'l DRILLING SERVICES A Halliburton Company Survey Ref: svy10055 Sperry-Sun Drilling Services . Survey Report for MPS-15 Your Ref: 500292306100 Job No. AKZZ22015, Surveyed: 21 January, 2002 BP EXPLORATION (ALASKA) INC. Alaska Drilling & Wells Milne Point Unit MPS-Pad Dev Working Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical Depth Incl. Azim. Depth Depth Northings Eastlngs Northlngs Eastlngs Rate Section Comment (ft) (ft) (ft) (ft) (ft) (ft) (ft) ("/1 OOft) 000 0 UOO 0.000 - 73.20 0,00 O.OON 0.00 E 5999991.03 N 565874.93 E 0.00 AK.6 BPJFR.AK 185.05 0 3.30 46,690 111.85 185.05 O,37N 0.39 E 5999991.40 N 565875,31 E 0178 034 27851 0380 46.550 205,31 278,51 0.76N 0.81 E 5999991.80 N 565875.73 E 0.054 071 364.95 0500 30.990 291.74 364.94 1.28 N 1.21 E 5999992.32 N 565876.13 E 0.195 1,21 456 09 0540 3 100 382 88 456.08 2,05 N 1.44 E 5999993,10 N 565876,35 E 0278 196 546.90 0800 14.720 473.68 546,88 3.09 N 1.62 E 5999994.14 N 565876.53 E 0.322 2.99 639 22 0810 30.690 566 00 639.20 4,28 N 2,12 E 5999995,33 N 565877,01 E 0.242 4.14 731 97 0900 64710 658.74 731 ,94 5.15 N 3.11 E 5999996.21 N 565878.00 E 0547 495 824.70 1 210 80 080 751 .45 824.65 5.63 N 4.74 E 5999996.70 N 565879,62 E 0.450 5.33 920.99 1200 78,490 847.72 920.92 6,01 N 6.73 E 5999997,10 N 565881.60 E 0.036 558 1 009 05 1.510 36.550 935.76 1 008 96 7.13 N 8.32 E 5999998.23 N 565883,19 E 1.149 6.60 1103.86 2440 6790 1030.51 11 03.71 10.13 N 9.30 E 6000001.24 N 565884,14 E 1 .429 9.54 1195 53 3360 357 130 11 22 06 1195.26 14.75 N 9.40 E 6000005.87 N 565884,20 E 1.133 14 14 1290.20 5.800 356.470 1216.42 1289,62 22.30 N 8.97 E 6000013.41 N 565883.70 E 2.578 21. 70 1 384 06 7640 357.260 1309 64 1382.84 33,27 N 8,38 E 6000024,37 N 565883.01 E 1 963 32.68 1476.70 7580 357.840 1401.46 1474,66 45.52 N 7.85 E 6000036.62 N 565882,38 E 0,105 4495 1572.00 7.890 357.650 1495.89 1569.09 58,34 N 7,35 E 6000049.43 N 565881.76 E 0326 57.77 1666,11 8090 358.980 1589,09 1662.29 71.42 N 6.96 E 6000062.50 N 565881 .26 E 0.289 70.85 1 759 98 9.680 354 640 1681.83 1755,03 85,88 N 6.11 E 6000076.96 N 565880,28 E 1 837 8533 1 850 1 1 11.800 352.510 1770.38 1843,58 102,56 N 4,20 E 6000093.62 N 565878.22 E 2.393 102.10 1946.38 12 420 350.010 1864.50 1937.70 122,52 N 1.12 E 6000113.55 N 565874,97 E 0843 12221 2037 47 13910 354.670 1953.20 2026.40 143.07 N 1.60W 6000134.08 N 565872,07 E 2,007 142.89 2 1 36 1 3 15810 356.470 2048 56 2121 ,76 168.29 N 3,53W 6000159.28 N 565869.92 E 1 982 168 19 2230 84 19.990 357 470 2138.66 2211.86 197,35 N 5.04W 6000188.33 N 565868.15 E 4425 19729 2324 60 25.630 357 1 fiO 2225.06 2298.26 233,65 N 6.75W 6000224.61 N 565866.12 E 6017 233.62 2420 40 29.720 356.890 2309,88 2383.08 278,07 N 9.07W 6000269.01 N 565863.41 E 4.271 278.10 2458 93 30.850 356.370 2343.15 2416.35 297.47 N 10.21 W 6000288.40 N 565862,10 E 3011 297.53 2590,38 33.360 357 61 0 2454.49 2527.69 367,23 N 13,85 W 6000358,12 N 565857.84 E 1 974 .167 38 2679 71 33 880 353 720 2528.89 2602.09 416,52 N 17.60 W 6000407.38 N 565853,66 E 2480 41681 277749 33 740 353.190 2610 1 3 2683.33 470.58 N 23,80 W 6000461.38 N 565846.98 E 0334 471 15 . ------------------"-------------- "---- ---" 6 February. 2002 - 2: 58 Page2of4 DliIIQuest 200.09.008 .'.. Sp~rry-Sun Drilling Services . Survey Report for MPS-15 ~ Your Ref: 500292306100 Job No. AKZZ22015, Surveyed: 21 January, 2002 BP EXPLORATION (ALASKA) INC. Alaska Drilling & Wells Milne Point Unit MPS-Pad Dev Working Measured Sub-Sea Vertical Local Coordinates Global CoordInates Dogleg Vertical Depth Incl. Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment (ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft) 2871 73 33 730 354 390 2688.50 2761.70 522,60 N 29,46 W 6000513,35 N 565840.86 E 0.707 523.43 2963 1 3 33 690 354 970 2764.53 2837.73 573,11 N 34,17 W 6000563,82 N 565835,71 E 0.355 574.13 3058 44 33970 356.430 2843.71 2916.91 626.02 N 38. 14 W 6000616,69 N 565831.27 E 0902 62718 3151.97 32.050 356.490 2922.14 2995.34 676.87 N 41.29 W 6000667.51 N 565827.67 E 2053 67813 3242 32 28 730 354 340 3000.06 3073.26 722.42 N 44,90 W 6000713.03 N 565823.66 E 3.866 723 82 3334.92 26 880 354.720 3081 97 3155,17 765.42 N 49.02 W 6000755,99 N 565819.16 E 2.007 766.99 3429 47 24 580 353 850 3167.14 3240.34 806,26 N 53.09 W 6000796.79 N 565814.73 E 2.465 808.00 352204 21 590 353.220 3252 29 3325.49 842,32 N 57.17W 6000832.82 N 565810.33 E 3.241 844.25 3613 1 3 19280 355 490 3337.64 3410,84 873,96 N 60.33 W 6000864.43 N 565806.89 E 2.681 876.02 3707 44 15.480 354 930 3427,63 3500,83 902.03 N 62.67 W 6000892.47 N 565804.31 E 4.033 904 1 8 3800 58 11.990 354 270 35 18 09 3591.29 924,04 N 64.73 W 6000914,47 N 565802.05 E 3.751 926.28 389736 7860 356 130 3613.40 3686.60 940,66 N 66,18 W 6000931,07 N 565800.45 E 4280 94295 3988 43 4450 355 890 3703.93 3777.13 950.40 N 66.86 W 6000940.80 N 565799,69 E 3744 95271 4083 18 4420 358.000 3798.40 3871.60 957,71 N 67.25 W 6000948.11 N 565799.24 E 0 175 960.04 4175.35 2770 346 620 3890,39 3963,59 963.43 N 67.89 W 6000953.82 N 565798.55 E 1.942 965.78 4272.35 1.400 18.760 3987.32 4060.52 966,83 N 68,05 W 6000957.22 N 565798,36 E 1.805 969.19 4364.73 1320 29.510 4079.68 4152,88 968.82 N 67,16 W 6000959.22 N 565799,23 E 0.289 971 12 4458.03 1630 25.220 4172.95 4246.15 970,96 N 66,07 W 6000961.37 N 565800,30 E 0.352 973.19 4551.81 1.790 31.080 4266.68 4339.88 973.42 N 64.74 W 6000963.84 N 565801.61 E 0.253 975.56 4646 68 2 140 26.200 4361.50 4434.70 976,28 N 63,19 W 6000966.71 N 565803.13 E 0.409 978 32 4738.65 1730 29.460 4453.42 4526.62 979,03 N 61 ,75 W 6000969.48 N 565804,54 E 0461 980 9ì 4797.39 1 730 29.460 4512.13 4585.33 980,57 N 60,88 W 6000971.03 N 565805,40 E 0.000 982 46 Projected Surv¡:.y All data is In Feet (US) unless otherwise stated Directions and coordinates are relative to True North. Vertical depths are relative to Well. Northings and Eastings are relative to Well. Magnetic Declination at Surface is 26.065° (06-Feb-02) The Dogleg Severity IS in Degrees per 100 feet (US). Vertical Section IS from Well and calculated along an Azimuth of 356.447Q (True), Based upon Minimum Curvature type calculations, at a Measured Depth of 4797,39f1.. The Bo"om Hole Displacement is 982.46ft., in the Direction of 356,44]0 (True), - - - -- ----------- --- - -- ---- 6 February. 2002 - 2:58 Page 3 of 4 ÐrillQuf>sl 2 00.09,008 Spèrry-Sun Drilling Services Survey Report for MPS-15 Your Ref: 500292306100 Job No. AKZZ22015, Surveyed: 21 January, 2002 . BP EXPLORATION (ALASKA) INC. Milne Point Unit Alaska Drilling & Wells MPS-Pad Dev Working Comments Measured Depth (ft) Station Coordinates TVD Northings Eastings (ft) (ft) (ft) Comment 4797.39 4585.33 980.57 N 60.88 W Projected Survey Survey tool program for MPS-15 From Measured Vertical Depth Depth (ft) (ft) To Measured Vertical Depth Depth (ft) (ft) Survey Tool Description 000 000 4797 39 4585.33 AK-6 BP _IFR-AK --- --- ------ 6 February. 2002 - 2:58 Page 4 of4 OrillQuesI2.00.09.008 AOGCC 333 W. 7th Ave. Suite 100 Anchorage, AK 99501 06-Feb-02 Re: Distribution of Survey Data for Well MPS-15 MWD Dear Dear Sir/Madam: Enclosed are two survey hard copies and 1 disk Tie-on Survey: Window / Kickoff Survey Projected Survey: 0.00' MD , MD (if applicable) 4,797.39' MD Please call me at 273-3545 if you have any questions or concerns. Regards, William T. Allen Survey Manager Attachment( s) RECEIVED FEB 0 7 2002 AIa8Iœ at & Gas Cons. Comrnis8icJt¡ Anchorage êiðd;'¿Yl/5 BP EXPLORA TION (ALASKA) INC. Milne Point Unit Alaska Drilling & Wells MPS-Pad Dev Working, Slot MPS-15 MPS-15 MWD Job No. AKMW22015, Surveyed: 27 January, 2002 SUR VE Y R E P 0 R T 7 February, 2002 Your Ref: 500292306100 Surface Coordinates: 5999991.03 N, 565874.93 E (70024' 37.4977" N, 149027' 48.9462" W) Surface Coordinates relative to Project H Reference: 999991.03 N, 65874.93 E (Grid) Surface Coordinates relative to Structure: 20.18 N, 469.91 W (True) Kelly Bushing: 73.200 above Mean Sea Level spe...,...,y-sul'l DRILLING SERVices A Halliburton Company Survey Ref: svy10054 Sp-erry-Sun Drilling Services . Survey Report for MPS-15 MWD Your Ref: 500292306100 Job No. AKMW22015, Surveyed: 21 January, 2002 BP EXPLORATION (ALASKA) INC. Alaska Drilling & Wells Milne Point Unit MPS-Pad Dev Working Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical Depth Incl. Azim. Depth Depth Northlngs Eastlngs Northings Eastings Rate Section Comment (ft) (ft) (ft) (ft) (ft) (ft) (ft) (o/100ft) 0.00 0000 0000 -73.20 0,00 0.00 N 0.00 E 5999991.03 N 565874,93 E 0.00 MWD Magnetic 185.05 0330 46.870 1 1 1. 85 185.05 0.36 N 0.39 E 5999991.40 N 565875.32 E 017R 034 27851 0380 46 550 205.31 278.51 0,76 N 0,81 E 5999991,80 N 565875.73 E 0.054 071 364 95 0500 31600 291. 74 364,94 1,28 N 1,22 E 5999992.32 N 565876,13 E 0.191 121 456 09 0540 3060 382.88 456,08 2,05N 1 .45 E 5999993.09 N 565876.36 E 0.284 196 546.90 0.800 14.980 473,68 546.88 3,09N 1.63 E 5999994.13 N 565876,54 E 0.323 2.99 639 22 0810 31070 566 00 639.20 4.27 N 2,14 E 5999995.32 N 565877,03 E 0.244 4.14 731 97 0900 65 000 658.74 731 94 5.14 N 3,14 E 5999996.20 N 565878.02 E 0.546 495 824 70 1 210 80 400 751 45 824.65 5,61 N 4.76 E 5999996.68 N 565879.64 E 0.450 532 920.99 1 2no 78 750 847.72 920.92 5,98 N 6.75 E 5999997.06 N 565881.63 E 0038 557 1 009 05 1 510 36.900 935.76 1 008 96 7,08N 8.35 E 5999998.19 N 565883,22 E 1.147 658 1103.86 2440 7 160 1030.51 1103.71 10,08 N 9.36 E 6000001.20 N 565884.20 E 1.429 952 1195.53 3 3f;0 357 530 1122 06 1195.26 14,70 N 9.48 E 6000005.82 N 565884.28 E 1.132 14 12 1290.20 5.800 356.960 1216.42 1289.62 22.25 N 9.11 E 6000013.36 N 565883.84 E 2.578 21 68 1384.06 7640 357 440 1309.64 1382.84 33.22 N 8,58 E 6000024.33 N 565883,22 E 1 961 32.67 1476.70 7.580 358 000 1401.46 1474.66 45.48 N 8.09 E 6000036.58 N 565882.62 E 0.103 44.93 1572.00 7.890 357.870 1495.89 1569.09 58.30 N 7.63 E 6000049.40 N 565882.04 E 0.326 57.75 1 666. 11 8090 359.250 1589.09 1662.29 71.38 N 7,30 E 6000062.47 N 565881.60 E 0.294 70.83 1 759 98 9.680 354,680 1681.83 1755,03 85,84 N 6.48 E 6000076.92 N 565880.66 E 1.852 85.31 1 850 11 11.800 352.510 1770.38 1843.58 102.52 N 4.58 E 6000093.59 N 565878.61 E 2.394 10208 1946 38 12420 349.770 1864.50 1937.70 122,47 N 1.46 E 6000113,51 N 565875,31 E 0.878 122.18 203747 13910 354 590 1953.20 2026.40 143.01 N 1,31 W 6000134,03 N 565872,35 E 2030 14285 21 36 1 3 15810 356480 2048.56 2121.76 168,24 N 3.26W 6000159.23 N 565870,19 E 1.987 168.14 2230 84 19990 357 970 2138.66 2211.86 197,31 N 4,62W 6000 188,29 N 565868,57 E 4.440 187.24 2324 60 25 630 357510 2225.06 2298.26 233.61 N 6.07W 6000224.58 N 565866,80 E 6.018 233.57 2420 40 29 720 357.360 2309.88 2383,08 278.05 N 8.07W 6000269.00 N 565864.41 E 4.270 27805 2458 93 30 850 356 1 80 2343.15 2416,35 297.45 N 9.17W 6000288.39 N 565863.14 E 3.314 29748 2590 38 33 360 357800 2454.49 2527.69 367.21 N 12.80 W 6000358.11 N 565858.89 E 2,019 367 33 2679 71 33 88r) 354 000 2528.89 2602,09 416,52 N 16.35 W 6000407.39 N 565854.91 E 2426 <1 1 6 76 2777 49 33740 353 390 2610.13 2683,33 470,60 N 22.32 W 6000461.41 N 565848.46 E 0376 471 10 - - -- --- . - --. -- --- - -- - ----- ----------- -------- 6 February. 2002 - 3:03 Page2of4 DfillQuesl 200.09,008 ~. ~. Sperry-Sun Drilling Services . Survey Report for MPS-15 MWD ~ Your Ref: 500292306100 Job No. AKMW22015, Surveyed: 21 January, 2002 BP EXPLORATION (ALASKA) INC. Alaska Drilling & Wells Milne Point Unit MPS-Pad Dev Working Measured Sub-Sea Vertical Local Coordinates Global Coordinates Dogleg Vertical Depth Incl, Azim. Depth Depth Northings Eastings Northings Eastings Rate Section Comment (ft) (ft) (ft) (ft) (ft) (ft) (ft) (0/100ft) 2871 73 33 ì30 354.700 2688.50 2761. 70 522.65 N 27.75 W 6000513,41 N 565842.57 E 0.772 523.38 2963. 1 3 33.690 355.130 2764.54 2837.74 573,17 N 32,25 W 6000563.90 N 565837.63 E 0.265 574.08 3058.44 33.970 356.520 2843,71 2916.91 626,09 N 36.11 W 6000616.78 N 565833.30 E 0.863 627 1 3 3151,97 32.050 356.580 2922.14 2995,34 676,95 N 39,17 W 6000667.61 N 565829,79 E 2.053 6 ì8 08 3242 32 28 ì30 354.580 3000.07 3073.27 722.51 N 42,66 W 6000713.14 N 565825.90 E 3841 72377 3334 92 26 880 355.000 3081.97 3155.17 765,53 N 46.58 W 6000756,12 N 565821.60 E 2.009 766.94 3429.4 ì 24 580 354.060 316714 3240.34 806.38 N 50.48 W 6000796.94 N 565817.34 E 2470 807.96 3522.04 21590 353.480 3252.29 3325.49 842.46 N 54.41 W 6000832.98 N 565813,09 E 3.239 844 20 36 1 3 1 3 19280 355.750 3337.64 341 0 84 874.11 N 57.43 W 6000864,60 N 565809,80 E 2.681 875.98 3707 44 15 480 355.220 3427.63 3500 83 902.19 N 59.63 W 6000892.66 N 565807.34 E 4.033 904.14 3800 58 11990 354 530 3518.09 3591 .29 924,22 N 61,59W 6000914.67 N 565805.19 E 3.751 926.24 3897.36 7.860 356.350 3613.40 3686.60 940,84 N 62.97 W 6000931.27 N 565803.67 E 4.279 94291 3988 43 4450 356.250 3703.93 3777.13 950,58 N 63.60 W 6000941.01 N 565802.95 E 3.744 952.67 4083 18 4420 358.190 3798.40 3871.60 957,90 N 63.95 W 6000948.32 N 565802,53 E 0.161 960.00 4 1 75 35 2770 346 690 3890.39 3963 59 963,61 N 64.58 W 6000954.04 N 565801.86 E 1.945 965 74 4272 35 1 400 19.040 3987.32 4060.52 967.01 N 64,73 W 6000957.44 N 565801.67 E 1.809 969.15 4364 73 1320 29.550 4079.68 4152.88 969.01 N 63.84 W 6000959.44 N 565802,55 E 0.283 971.08 4458.03 1630 25.410 4172.95 4246,15 971.14 N 62.74 W 6000961.58 N 565803,63 E 0.351 973 15 4551 81 1790 31 .440 4266.69 4339.89 973.59 N 61.40 W 6000964,05 N 565804,94 E 0.257 975 52 4646 68 2 140 26 51 0 4361.50 4434.70 976.44 N 59.84 W 6000966.91 N 565806.48 E 0.409 978.2ì 4738.65 1 730 29.620 4453.42 4526.62 979,19 N 58,39 W 6000969.66 N 565807,91 E 0460 980.93 4797.39 1730 29.620 4512.13 4585.33 980,73 N 57.51 W 6000971.21 N 565808.77 E 0000 982.41 ProJPr;tRrj Survey All data IS In Feel (US) unless otherwise stated. Directions and coordinates are relative to True North. Vertical depths are relative to Well. Northings and Eastings are relative to Well. Magnetic Declination al Surface is 26.065° (06-Feb-02) The Dogleg Severity is In Degrees per 100 feel (US). Vertical Section is from Well and calculated along an Azimuth of 356.644° (True). Based upon Minimum Curvature type calculations. al a Measured Depth of 4797.300" The Bottom Hole Displacement is 982 41 ft.. in the Direction of 356.644° (True), --------. - 6 February. 2002 - 3:03 Page 3 of 4 DrillQuest 2.00.09.008 Spèrry-Sun Drilling Services Survey Report for MPS-15 MWD Your Ref: 500292306100 Job No. AKMW22015, Surveyed: 21 January, 2002 8. BP EXPLORATION (ALASKA) INC. Milne Point Unit Alaska Drilling & Wells MPS-Pad Dev Working Comments Measured Depth (ft) Station Coordinates TVD Northlngs Eastings (ft) (ft) (ft) Comment 4797.39 4585 33 980.73 N 57,51 W Projected Survey Survey tool program for MPS-15 MWD Fro m Measured Vertical Depth Depth (ft) (ft) To Measured Vertical Depth Depth (ft) (ft) Survey Tool Description 000 000 4797,39 4585,33 MWD Magnetic - - -- --- --.- ---------- 6 February. 2002 - 3:03 Page 4 of 4 Dril/Ollesl 200.09.008 \IJ(l/\ L/ f I ¡ l c, 2- I STATE OF ALASKA) ;/~-i.-\: (, - ALASKA OIL AND GAS CONSERVATION COMMISSION bì5 ~ \;1 q APPLICATION FOR SUNDRY APPROVAL I 1. Type of Request: 0 Abandon 0 Suspend 0 Plugging 0 Time Extension 0 Pertorate 0 Alter Casing 0 Repair Well 0 Pull Tubing 0 Variance 1m Other 0 Change Approved Program 0 Operation Shutdown 0 Re-Enter Suspended Well 0 Stimulate Run Completion Tubing ~ 2. Name of Operator BP Exploration (Alaska) Inc. 3. Address P.O. Box 196612, Anchorage, Alaska 99519-6612 5. Type of well: 0 Development 0 Exploratory 0 Stratigraphic 181 Service ~. 6. Datum Elevation (DF or KB) KBE = 73.20' 7. Unit or Property Name Milne Point Unit 4. Location of well at surface 3322' NSL, 136' WEL, SEC. 12, T12N, R10E, UM At top of productive interval 4294' NSL, 201' WEL, SEC. 12, T12N, R10E, UM At effective depth 4300' NSL, 198' WEL, SEC. 12, T12N, R10E, UM At total depth 4302' NSL, 196' WEL, SEC. 12, T12N, R10E, UM 12. Present well condition summary Total depth: measured true vertical 8. Well Number MPS-15i 9. Permit Number 201-245 10. API Number 50- 029-23061-00 11. Field and Pool Milne Point Unit 1 Schrader Bluff Effective depth: measured true vertical 4797 feet 4585 feet 4703 feet 4491 feet Plugs (measured) Junk (measured) Casing Structural Conductor Surface Intermediate Production Liner Length Size Cemented MD TVD 77' 2464' 20" 9-5/8" 260 sx Arctic Set (Approx.) 501 sx Class 'L', 225 sx Class 'G' 112' 2499' 112' 2451' 4756' 7" 249 sx Arctic Set I, 225 sx Class 'G' 4788' 4576' Perforation depth: measured NIA RECEIVED true vertical Tubing (size, grade, and measured depth) NIA APR 1 8 20U; AlBaOiI & Gas Cons. Commission Anchorage Packers and SSSV (type and measured depth) NIA 13. Attachments 181 Description Summary of Proposal 0 Detailed Operations Program 15. Status of well classifications as: 0 Oil 0 Gas 0 Suspended 0 BOP Sketch 14. Estimated date for commencing operation April 24, 2002 ./ 16. If proposal was verbally approved Service Water Injection Name of approver Date Approved Contact Engineer Name/Number: Steve Campbell, 564-4401 17. I ~erebY certify th~~nr{irue and correct to the best of my knowledge Signed Paul Cha~ - J<.....I ~ Title Drilling Engineer Commission Use Only Conditions of Approval: Notify Commission so representative may witness "< GL' c.::. l>~' \ "ðG \?~ ~.~ A I N '\. I ../ \ '::> ~ I pprova o. Plug integrity - BOP Test ~ Location clearance - Mechamcallntegrity Test L Subsequent form required 10- l4. G '1 Approved by order of the Commission Ca,~ (~~ ~'!'f':'\ i Form 10-403 Rev. 06/15/88 0 ',-,,' ij- \ 'j ;'l ¡D':I I'. \ ~- Prepared By NameINumber: Sandra Ste, wman 564-4750 Date Â'P t2- (1, 0 '-- ? ,,-. ~, '-:. ~, ----' v' c::>-l - /_c.:.-- Commissioner Date t./ 119/0 .)- Submit In Triplicate Schrader Bluff S-15 Injection Well Completion 1. 2. 3. 4. 5. 6. 7. MIRU N4ES. ND Tree/NU BOPE. ¡ RIH with 7" packer on 3-1/2" BTC tubing." Land tubing and freeze protect well. Set pacl(cr.~t 1275' MD. -,' 1U6A- ND BOPE/NU Tree. RDMO N4ES. Post rig work: Perforate the Schrader Bluff OA and OB sands. --- '.,.,- .,,,, ~ I)' t ý f .;.' ':. t .' Vl, :, ,. '- \ I OA Perfs 08 Perfs j ~ f ~ .~ ¡~ ~:1 ¡ :J , ,I '. ; :: ;I . ~ '.. I¡ :~ 1 - ~ II! i : ! j " ~ r, ~: ~¡ ~: ~ " :} : 1 ! :1 ~ ~ t ;! ~, ~ ! ~ ¡ ~ ) " ~ ; Ii ' . ¡ ¡ ¡ t' ~~ .~f ¡;~ I ~ , f I . r r " j ~- ) S-15 Injector Completion Diagram (PROPOSED 4-16-02) ~ Tubing hanger connection 4-1/2" NSCT pin x-over pup 4-1/2" NSCT box X 3-1/2" 18T pin 3-1/2" 9.3# L80 18T tubing 3-1/2" 'X' nipple (2.813') set at -2200' md 3-1/2" 9.3# L80 18T tubing 3-1/2" 18T box X 4-1/2" NSCT Pin x-over 7" x 4-1/2" packer - 8aker S-3 (set at -4275' md) 4-1/2" NSCT box X 3-1/2" 18T pin x-over 3-1/21111 9.3# L80 pup jt (-10') 3-1/2" 'XN' nipple with 2.75" no-go 3-1/2" 9.3# L80 pup jt (-10') Re-entry guide 7", 26#, L-80, BTC-M R3 ~OJ-d'l5 WELL LOG TRANSl\tITTAL To: State of Alaska Alaska Oil and Gas Conservation Camm. Ann,: Lisa Weepie 333 West 7th Avenue, Suite 100 Anchorage, Alaska 9950 I l\'larch 21, 2002 RE: l\1\VD Fonl1ation Evaluation Logs l\1PS-15, AK-l\~1-220 15 I LIS fonnatted Disc \tvith verification listing, API#: 50-029-23061-00 PLEASE ACKNO\VLEDGE RECEIPT BY SIGNING A COpy OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: Sperry-Sun Drilling Services Attn: Jim Galvin 6900 Arctic Blvd. Anchorage, AJaska 99648 BP Exploration (Alaska) Inc, Petro-technical Data Center LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99649-6612 Date: ~y {' Sign~~--t ~~'--~ RECE\\JE.O r "','"' (L~~2 .. .';' \ ... . mmØ'{\ &Ga5CQt\S.ca ~-Q\\ M~- ~ GeoQuest 3940 Arctic Blvd Anchorage. AK 99503 ATTN: Sherrie MPS-15 MPE-02 Well riO/-dt.J5 ) ~5-/CjI Job # 22132 SCMT 22122 RST-SIGMA Log Description PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COpy EACH TO: BP Exploration (Alasko) Inc. Petrotectnical Data Center MB3-3 900 E. Benson Blvd Anchoroge, Alosko 99519-6ö 12 Date Delivered: RECEIVED t.i .~:; '; Q O002 . ",, L , L Alaska Oil & Gas Cons. CommiSSion II. ...,.J.............. Date 03/06/02 03/02102 .3/27/2002 NO. 1936 Company Alaska Oil & Gas Cons Comm Aftn: Lisa Weepie 333 West 7th Ave. Suite 100 Anchorage. AK 99501 Field: Milne Point CD Color 2 Sepia BL Schlumberger GeoQuest 39L10 Arctic Blvcj Anchorage. AK 99503 A TTI'J Sherrle Received b'li~~ . I () P ~--_/ql./;;"'T\.- U._\J2.ç'~ ' .c"----" Re: Pulling VSP on S-pad Subject: Re: Pulling VSP on S-pad Date: Tue, 19 Mar 2002 17:06:41 -0900 From: Tom Maunder <tom_maunder@admin.state.ak.us> To: "Campbell, Steve K" <CampbeIS@BP.com> CC: AOGCC North Slope Office <aogcc_prudhoe_bay@admin.state.ak.us> Steve, Thanks for the additional information regarding the VSP surveys. I had some questions from the inspectors regarding the work. You had described the work in the original permit to drill applications for the S pad wells. This message gives further details regarding the operation. It is interesting that there are individual BOP stacks on the wells. Regardless, the wells are still unperforated and will remain so until4ES completes the wells. You have approval to proceed with the operations as you describe. I will copy this message and place it in the respective well files. You do not need to provide a 403 for the operations. Please call if you have any questions. Tom Maunder, PE AOGCC "Campbell, Steve K" wrote: ~dO\ -dL\S > Reference wells: MPS-15, 21, 31 & 9 > > Tom, > > In the original permits for the above mentioned wells, I did not include the > pulling of the VSP from the wells using the Klondike rig which will already > be over one of the wells waiting on the completion of the surveys. After > the surveys have been completed the plan is to have the Klondike rig pull > the VSP from each of the wells leaving the well as it was when the drilling > rig left it. Nabors 4es will be coming out to run the completions at a > later date. > > Procedure for pulling the VSP's: > > 1. Run survey's > 2. Move Klondike rig on to well > 3. Pull VSP from the well > 4. Install BPV > 4. Close master valve and Nipple down the BOP's > 5. Install tree cap and secure well > 6. Move Klondike rig off > > Can you give me a verbal to do this work and we could send you a 10403 to > follow it up for each well? > > Thanks for your consideration! > > Steve Campbell > BP Drilling Engineer > 907-564-4401 (0) > 907-564-4441 (f) > campbels@bp,com 1 of 2 3/20102 12:31 PM Re: Pulling VSP on S-pad ---- i Tom Maunder <tom maunder@admin.state.ak,us> I Sr. Petroleum Engineer i i Alaska Oil and Gas Conservation Commission ! ----_._-- 2 of 2 3/20/02 1231 PM ~ GeoQuest 3940 Arctic Blvd Anchorage. AK 99503 ATTN: Sherrie -~ Well Job # 22087 22087 22087 22087 22087 22087 MPS-15 I.J? MPS-15 ":> MPS-15 ~ MPS-15 .() MPS-15 :0 MPS-15 Log Description PEX AIT DSI (PDC) PEX-R ESISTIVITY PEX-NEUTRON/DENSITY DSI PEX & DSI TVD SIDEWALL CORES Date 01/24 &27/02 01/24 &27/02 01/24 &27/02 01/24 &27/02 01/24 &27/02 01/27/02 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING ONE COPY EACH TO: BP Exploration (AI(]SKCI) Inc. Pefrotectnicol Doto Center MB3-3 900 E. Benson Blvd. Anchorage. ,A,loska 99519-6612 Dote Delivered: RECEIVED t I ~:""! 0 :- 0002 'il"'\;"' .J L AJaskaOil & Gas Cons. Comnùsion Anchof8ge 3/4/2002 NO. 1864 Company Alaska Oil & Gas Cons Comm Attn: Lisa Weepie 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Field: Milne Point CD 1 Sepia BL Schlumberger GeoQuest ~~9~O Arctic Blvd Anct'".)roge. AK 99503 ATïN' Sherrie ReceiVedbY~~ Schlumberger NO. 1820 Schlumberger Technology Corporation, by and through is Geoquest Division 3940 Arctic Blvd, Suite 300 Anchorage, AK 99503-5711 ATTN: Sherrie 02/19/02 Company: Alaska Oil & Gas Cons Comm Attn: Lisa Weepie 333 West 7th Ave, Suite 100 Anchorage, AK 99501 Field: Well Job # Log Description Date BL Sepia I 'ð 7;"" 1l.:J 3 3H-15 INJECTION PROFILE 02/01/02 1 1 a. oO-I3CD 1 D-140 22066 RST-SIGMA 01106/02 1 1 dO\j- °3Þ 1 L-20A 22054 SCMT 01/28/02 ..310 /-¡)t¡ r: 1 C-24 22055 USIT 01/20/02 1 C-24 22055 SSLT 01/20/02 ,-9.0) -/31 2 P-415 21488 BEST DT-SONIC PROCESSING 11/24/01 2P-415 21488 ELAN GLOBAL SOLVER (TVD) 11/24/01 2P-415 21488 FRACADE ADVISOR MECH PROPERTIES (TVD) 11/24/01 aO}- 001 2P-417 21243 ELAN ELEMENTAL ANALYSIS 05/12/01 2P-417 21243 FRACADE ADVISOR MECH PROPERTIES 05/12/01 SIGN&-(J- ().Qep~ DATE: Kuparuk CD Color 1 1 1 1 1 1 1 1 RECEIVED FEB 1 9 2002 Please sign and return one copy of this transmittal to Sherrie at the above address or fax to (907) 561-8317. Thank you. AlaskaOiI&GasCons.Commission Anchorage 5pe~~\I-5un CR"IL-LING SERVIc:eS A Halliburton Conlpany January 30, 2002 dlJ l- ~yç- To: AOGCC Attn: Howard Oakland 333 West 7th Avenue, Suite 100 Anchorage, AK 99501 F O~S From: Sperry Sun Drilling Services Attn: Bernie Leas 6900 Arctic Blvd. Anchorage, AK 99518 Contents: Washed & Dried From: BP Exploration Alaska Inc. MPS-15i North Slope, Alaska API # 50-029-23061-00 Shipment Includes: Total Number Of Sample Boxes Included In This Shipment 3 Box NO.1: 110' to 1460' Box NO.2: 1460' to 3240' Box NO.3: 3240' to 4758' I rocess Depth Start 110' Process Depth End 4758' TO Process Date Start 1-21-02 Process Date End 1-27 -02 RECEIVED BY: I~;¡:m~ (ý ~~n Name ~~C~/~ , ¡:-Ce 0 ~D Qt,~ ¡ ;00; ~, DATE: .\.: I\fPS-15i pennit(revl) Subject: FW: MPS-15i permit (revl) Date: Wed, 26 Dee 2001 12:28:34 -0600 From: "Campbell, Steve K" <CampbelS@BP.eom> To: "\vinton_aubert@}admin.state.ak.us'" <winton - aubert(@admin.state.ak.us> Steve Campbell 907-564-4401(0) 907-564-4441(f) campbels@bp.com Working to many wells at the same time. not 10-3/4" Sorry for the confusion. This one has 9-5/8" surface casing > -----Original Message----- > From: Campbell, Steve K ;;. Sent: Wednesday, December 26, 2L10l 9:20 .JiM > To: 'winton_aubert@awnin.state.ak.us' > Subject: NPS-15i permit > > As per Tom Maunders request for clarifications to the permit on NPS-15i: > > Cement yields: > 9-5/8" surface casing: lead = 4.15 cuft/sz & tail = 1.15 cuft":s.Y. > 7" production casing: tail = 1.15 cuft/sx > > > Top of cement for the 7" production casing is planned at ]"-:'57' MD > > > The 9-5/8" shoe test ¡Úll be (FIT to 10.0 ppg ENW) > > At the end of the well the 9-5/8"" x 7" annulus will be freeze > protected by bu11heading diesel do¡.,m to the shoe of the 9-5,.'8"" casing. > > Note: Cutting samples tÚll also be caught as per lJ,.OGCC regulations as this > is the first 1\7e11 on a neL~' pad. > > If you need any further information please call me today. > > Thanks for your help & have a great day! > > > Ste\Te Campbell > 907-564-4401(0) > 907-564-4441 (f) > campbels@bp.com > > 101' 1 11116.'01 9:.t1 A~1 ~~]~E : F ~,~ffiu~~~:Æ ALASKA. OIL AND GAS CONSERVATION COMMISSION TONY KNOWLES, GOVERNOR 333 W. -¡r>t AVENUE. SUITE 100 ANCHORAGE, ALASKA 99501-3539 PHONE (907) 279-1433 FAX (907) 276-7542 Pat Archey Senior Drilling Engineer BP Exploration (Alaska) Inc. P.O. Box 196612 Anchorage, Alaska 99519-6612 Re: Milne Point S-15i BP Exploration (Alaska) Inc. PeIlTIit No: 201-245 Sur. Loc. 3322" NSL, 136' WEL, SEC. 12, TI2N, RI0E, UM Btmhole Loc. 4286' NSL, 205' WEL, SEC. 12, T12N, RIOE, UM Dear Mr. Archey Enclosed is the approved application for permit to drill the above referenced well. The pennit to drill does not exempt you from obtaining additional permits required by law from other governmental agencies, and does not authorize conducting drilling operations until all other required permitting detenninations are made. Annular disposal has not been requested as part of tbe Pennit to Drill application for Milne Point Unit S- 15i. A full suite of fonnation evaluation logs, mud log, and formation samples are required from conductor depth to TD. The blowout prevention equipment (BOPE) must be tested in accordance with 20 AAC 25.035; and the mechanical integrity (MI) of the injection wells must be demonstrated under 20 AAC 25.412 and 20 AAC 25.030(g)(3). Sufficient notice (approximately 24 hours) of the MI test before operation, and of the BOPE test perfonned before drilling below the surface casing shoe, must be given so that a representative of the Commission may witness the tests. Notice may be given by contacting the Commission petroleum field inspector on the North Slope pager at 659-3607. aniel T. Seamount, Jr. Commissioner BY ORDER OF THE C01\lMISSION DATED this 26th day of December, 2001 jjc/Enclosures cc: Department of Fish & Game, Habitat Section \Vlo encl. Department of Environmental Conservation w/o encl. LenQth 80' 2548' 4653' t \ð/0 \ - \#..J(,A I ¿.ll ~. IN] t) ~ / "\ Water Injector "'..:' "J /,</L .Y 0 Exploratory Dßtratigraphic Test 0 Development Oil II Service 0 Development Gas 6 Single zone)lb 0 Multiple Zone 5. Datum Elevation (DF or KB) 10. Field and Pool Planned KBE = 68' Milne Point Unit / Schrader 6. Property Designation Bluff ADL380109 7. Unit or Property Name Milne Point Unit 8. Well Number MPS-15i 9. Approximate spud date January 1, 2002 Amount $200,000.00 14. Number of acres in property 15. Proposed depth (MD and TVD) 2560 4653' MD / 4428' TVD 17. Anticipated pressure {see 20 AAC 25.035 (e) (2)} 35 0 Maximum surface 1437 psig. At total depth (TVD) 4271' / 1865 psig Setting Depth T0D Aotom MD TVD MD TVD 0' 0' 113' 113' 0' 0' 2548' 2482' 0' 0' 4653' 4428' pN ALASKA ( STATE OF ALASKA )AND GAS CONSERVATION COMMI~ PERMIT TO DRILL 20 AAC 25.005 1 b. Type of well 1 a. Type of work II Drill 0 Redrill 0 Re-Entry 0 Deepen 2. Name of Operator BP Exploration (Alaska) Inc. 3. Address P.O. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 3322' NSL, 136' WEL, SEC. 12, T12N, R10E, (As Proposed) At top of productive interval 4286' NSL, 205' WEL, SEC. 12, T12N, R10E, UM At total depth 4286' NSL, 205' WEL, SEC. 12, T12N, R10E, UM 12. Distance to nearest property line 13. Distance to nearest well ADL380110, 205' MD No Close Approach 16. To be completed for deviated wells Kick Off Depth 300' Maximum Hole Angle 18. Casin~ Program Specifications Sl7e CasinQ WeiQht Grade CouDlinQ 20" 92# H-40 Welded/Ins 9-5/8" 40# L-80 BTC 7" 26# L-80 BTC 11. Type Bond (See 20 AAC 25,025) Number 2S100302630-277 Hole 42" 12-1/4" 8-1/2" Quantitv of Cement (include staQe data) 260 sx Arctic Set (Approx.) 481 sx Class 'L', 285 sx Class 'G' 157 sx Arctic Set I 19. To be completed for Redrill, Re-entry, and Deepen Operations. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical feet feet feet feet Junk (measured) Plugs (measured) Casing Structural Conductor Surface Intermediate Production Liner Length Size Cemented MD TVD RECEIVED Perforation depth: measured DEe 2 0 ZOOl Alaska Oil & ~ashcon&. Commissior¡ '"Inc orage true vertical 20. Attachments II Filing Fee 0 Property Plat 0 BOP Sketch 0 Diverter Sketch II Drilling Program II Drilling Fluid Program 0 Time vs Depth Plot 0 Refraction Analysis 0 Seabed Report 0 20 AAC 25.050 Requirements Contact Engineer Name/Number: Steve Campbell, 564-4401 21. I hereby certify that th~f9regOi;J-.yrue landl/jr~t tll~e best of my ~nowl~~ge , Signed Pal Archey /;..æ:-~ (a~té£). I~/J.( ~ Title Senior Drilling Engineer I Commission Use Only Permit Number API Number. A..P~roval Date See cover letter ,2¿,1/---:2Y5" 50-¿)-¿~q" -2 .~¿&'I .-èC) lol,/~lc /0 J for other requirements Conditions of Approval: Samples Required RYes 0 No Mud Lo Required ~~s 0 No Hydrogen Sulfide Measures 0 Yes ~o Directional Survey ReqUired ~es 0 No Required Working Pressure for BOPE D2K 0 3K D4K 0 5K 0 10K 0 15K 0 3.5K psi for CTU I:lf.?yiJJther: ~ SOt) \>~, ~~-'tl;(.~~ '-.sl.~Q."-\ Q~\\\:"'I \..o~ ~~()~~ o.~~\.X.I \ .ço't"'~o~~~('\ by order of Approved By ORIGINAL SIGNED BY .', ~o":mis~ione~. the commission Date I d Ir.~ lð I ~ J . Form 10-401 Rev. 12-01-85 U I ay10r Seamount .( ~ i. ¡::,. ( ï 'I /\ i S~~lt In Tnpllcate \ f ~ '~ï,: ,_I" . - ',: \. -.' I I \;! \ å.- Prepared By Name/Number: Sondra Stewman, 564-4750 Date Ii-II 9 Ie) I Schrader Bluff S Pad Development MPS-15i Drilling Permit 1. Well Plan SUmmary Well Name: MPS-15i I Type of Well (producer or injector): I Grassroots Water Injector Suñace Location: 3322' FSL (1956' FNL), 136' FEL (5143' FWL), Sec 12, R10E, T12N X=565873.9600 Y=5999990.6000 4286' FSL (992' FNL), 205' FEL (5073' FWL), Sec. 12, R10E, T12N X=565796.0600 Y=6000954.01 00 Target (Bottom Hole Location): I AFE Number: MD I 4653' I I TVDrkb (TD) I 4428 I I Rig: 1 Nabors 27E I I Operating days to complete: 113 I I KBE I 68 I I Max. Inc. I 35 I I Estimated Start Date: I January 2002 I I Well Design (conventional, slim hole, etc.): 1 Conventional Grassroots Injector Well Scope: Drill an Injector Well to support the future Multi-Lateral Producers. This well is designed for water injection initially into the Schrader Bluff OA and OB sands. Post rig ~ work includes: CBL and running VSP on 1-1/2" pipe. Completion will be permitted at 7'- a later date. 2.0 Current Well Information 2.1 General Well Name: Well Type: Current Status: BHP: BHT: MPS-15i Development - Schrader Bluff Water Injector Waiting on Conductor to be set 1893 psi @ 4206' TVDss Schrader Bluff lOB' sand. Normal pressure gradient. 88°F @ 4400 TVDss Estimated (SOR) 2.2 Current Mechanical Condition Conductor: N/A 2.3 Target Estimates Estimated Reserves: Injector to sweep: 1.0 Mstbo Expected Initial Rate: Injection rate: 3000 bwpd Expected 6 month avg: Injection rate: 2000 bwpd Version #1, 12/17/01 Schrader Bluff S Pad Development MPS-15i Drilling Permit 3. Drillina Hazards and Continaencies 3.1. Well Control MANDATORY WELL CONTROL DRILLS: Drill D1 D2 D3 D4 D5 Type Tripping Drilling Diverter Accumulator Well Kill Frequency (1) per week, per crew (1) per week, per crew N/A Prior to spud or RWO Prior to drill out, per crew Comments Conducted only inside casing. Either in cased or open hole. DO NOT shut-in well in open hole. N/A Approx. every 30 days, thereafter at convenient times. Prior to drill out the intermediate and production strings. Never carry out this drill when open hole sections are exposed. 3.2. Lost Circulation 3.2.1. Lost circulation has not been encountered while drilling this interval on previous offset wells, but has been seen during cement jobs. Make sure and condition the mud prior to running and cementing casing. Be prepared to do a top job if required. 3.2.2. Follow the LOST CIRCULATION DECISION MATRIX in the well plan if fluid losses occur while drilling. Break circulation slowly in all instances and get up to recommended circulating rate slowly prior to cementing. 3.3. Unexpected High Pressures 3.3.1. It is unlikely there will be unexpected overpressure when drilling to the Schrader Bluff formation. Reservoir pressure is expected to be 1893 psi (8.65 Ib/gal). In this well, the Schrader Bluff formation will be drilled with 9.1 ppg mud. This well we be drilled in the undrained portion of the MPH-08 fault block. Offset injectors that have above normal shut-in pressures will be shut-in prior to drilling this well. Some of the wells on H-pad have experienced sever gas cut mud well below the permafrost. Have gas detector installed prior to drilling on S-pad. 3.4. Stuck Pipe 3.4.1. Good drilling practices to avoid differential sticking are required. Minimum mud weights and proper mud properties as outlined in the MI mud program must be closely followed. 3.4.2. Stuck Pipe: Go immediately to SURE manual, determine stuck pipe mechanism, follow recommendations in the SURE manual. DO NOT JAR UP if packed-off! 3.5. Pad Data Sheet 3.5.1. Please Read the S-Pad (based on offset wells drilled in same fault block) Data Sheet thoroughly. 3.6. Hydrates 3.6.1. Have been seen in offset wells and is likely on this well. Follow RP for controlling Hydrates. 3.7. Breathing 3.7.1. No breathing problems are expected drilling the Ugnu or the Schrader Bluff formations. 2 Schrader Bluff S Pad Development MPS-15i Drilling Permit 3.8. Hydrocarbons 3.8.1. Hydrocarbons will be encountered in the Ugnu and Schrader Bluff intervals. Free gas maybe encountered below the upper Ugnu. Hydrogen Sulfide 3.8.2. MPS Pad is not designated as an H2S Pad. Drillina Proaram Overview 4.1. Surface and Anti-Collision Issues Surface Shut-in Wells: No wells need to be shut-in for the rig move on and off Close Approach Wells: There are no close approach wells Well Name Current Status N/A Production Priority N/A N/A 4.2. Well Control Surface hole Expected BHP 983 psi @ 2200' TVD ( estimated) Max Exp Surface Pressure 763 psi (0.1 psi/ft gas gradient) Production hole Expected BHP 1865 psi @ 4271' TVD (estimated) Max Exp Surface Pressure 1437 psi (0.1 psi/ft gas gradient) 4.3. Mud Program 12-1/4" Surface Hole Mud Properties: Density (ppg) Funnel vis YP 8.6 - 9.6 100 -150 25 - 40 HTHP N/A 8-1/2" Production Hole Mud Properties: Density (ppg) Funnel vis YP 8.6 - 9.6 50 - 150 25 - 40 HTHP N/A Precautions N/A BOPE Rating 21-1/4" 2000 psi WP Diverter Planned BOPE Test Pres. *Function test only BOPE Rating 13-5/8" 5000 psi WP Planned BOPE Test Pres. Annular and Rams 250 psi low & 2500 psi high Spud - LSND Freshwater Mud pH API Filtrate LG Solids 9.0 - 9.5 N/A N/A LSND Freshwater Mud pH API Filtrate LG Solids 9.0 - 9.5 < 6 < 6.5 3 Schrader Bluff S Pad Development MPS-15i Drilling Permit LCM Restrictions: N/A "",'-" Waste Disposal: NO ANNULAR INJECTION. Drill Cuttings taken to DS-4 disposal site Call the Pad 4 waste disposal site prior to truck leaving location so the site can be ready to unload waste. Exempt liquid wastes can be taken to DS-4 or Phillips KRU 1 R. 4.4. Formation Markers Formation Tops ft MD ft TVDss Pore psi EMW (ppg) Base Permafrost 1818 1750 -~\J~C (( SV1 Top Ugnu 3750 3456 1555 8.65 Top Ugnu M 4153 3857 1736 8.65 NA 4263 3967 1785 8.65 NB 4290 3994 1797 8.65 NC ABS ABS ABS ABS NE 4342 4046 1821 8.65 NF 4386 4090 1840 8.65 - ,,~,,~ \-~~~ Top OA 4416 4120 1854 8.65 Base OA 4453 4157 1871 8.65 Top OB 4484 4188 1885 8.65 Base OB 4502 4206 1893 8.65 4.5. CasinglTubing Program Hole Size WtlFt Grade Conn. Length Csgl Tbg O.D. 42" 20" 92# H-40 12 % " 9-5/8" 40# L -80 8 %" 7" 26# L-80 Note that the 20" conductor will be insulated Welded BTC BTC 80' 2548' 4653' Top MD I TVDrkb 0' 0' 0' Bottom M D I TVDrkb 113' 1 113' 2548' 1 2482' 4653' 1 4428' 4.6. Cement Calculations Casin~ Size I 9-5/8" 40 Ib/ft L-80 BTC Surface casing Basisl 2500/0 excess over gauge hole in permafrost interval, 40% excess over gauge hole below permafrost Total Cement Volume: Wash Spacer Lead Tail Temp 50 bbl of Newtonian Chemical Wash (CW100) weighted to 8.32 ppg 75 bbl of Viscosified Spacer (Mudpush XL Design) weighted to 10.50 ppg 481 sxsl10.7lb/gal Class L Lli5 {1t 5/~iL 285 sxs115.8 Ib/gal Class C I I S ~ ~I ~ ~ . , I BHST == 80° F from SOR, BHCT 85° F estimated by Halliburton Casin~ Size I 7" 26 Ib/ft L -80 BTC Production casing Basisl 40% excess over gauge hole below permafrost Total Cement Volume: Wash Spacer Lead Tail Temp 50 bbl of Newtonian Chemical Wash (CW 1 00) weighted to 8.32 ppg 75 bbl of Viscosified Spacer (Mudpush XL Design) weighted to 10.50 ppg 157 sxs 15.8lb/gal Class G Arctic Set I t./: D~Y,-,Þ- I BHST == 80° F from SOR, BHCT 85° F estimated by Halliburton T (, C -=- r 1.:: 1 I . J -'. 4 Schrader Bluff S Pad Development MPS-15i Drilling Permit 4.7. Survey and Logging Program Hole Section: Open Hole: Surface: MWD/DIRlGR & Wireline logs (Platform express/Dipole Sonic Production: MWD/DIRlGR & Wireline logs (Platform express/Dipole Sonic/SWC Cased Hole: CBl (post rig) 4.8. Bit Recommendations BHA Hole Size Number and Section 1 12-1/4" 2 8-1/2" Depths (MD) Bit Type Nozzles Max. K-Revs Hours 0' - 2300' 2300' - 4653 MXC-1 MXC-1 TBD 3-13' & 1-10 5. MPS-15 Nabors 27E Operations Summary 5.1. Pre-Rig Operations 1. Check conductor level for correct spool spacing for rig flowline. 2. Check out pad and road for proper rig clearance. 5.2. Procedure 3. MIRU Nabors 27E, NU diverter on 20'1 conductor, PU 5" drill pipe 4. MU kickoff assembly with 12-1/4" MXC-1, MWD/GR. 5. Drill 12-1/4" to kickoff point at 300' and start building angle to end of build at 2548' MD, 2481' TVD/RKB. 6. CCM and perform a conditioning trip. POOH for open hole logs 7. Perform wireline logs as required (Platform Express/Dipole Sonic) 8. Run 9-5/8" 40# L-80 BTC, CCM for cement job 9. Mix and pump cement as per the Cement plan. 10. NO 21-1/4" diverter and nipple up 20" X 11" Gen 5 wellhead and test .ß 11. NU BOP's and test annular to 250 psi low and 2500 psi high, test ram to 250 psi low an~o psi high 12. P~-1/2" bit and directional assembly (MWD/GR) and run in hole to top of cement. Test casing to 4500 psi. Drill out float equipment and 25' of new formation. Circulate out any cement-contaminated mì1d. L O-CI{" ,./ 13. Perform a lea~st. Expected LOT = 10.0 ppg 14. Drill 8-1/2" hole to start of drop at 3200' MD, 3017' TVD/RKB. Start dropping 3.3°/100' to until vertical at 4116' MD, 3892' TVD/RKB. 15. Continue drilling 8-1/2" hole to a total depth of 4652' MD, 4428' TVD/RKB. POOH 16. Perform wireline logs as required (Platform Express/Dipole Sonic/60 SWC) 17. Perform conditioning trip. POOH with DP and lay down BHA . 18. Rig up and run 7" 26# L-80 BTC casing to TO, CCM for cement job. 19. Mix and pump ce,.rnent as per theBment plan. Bump the plua usina 60/40 KCUMethanol for ¡freeze protect..J Test casing to \,510 psi1 -- ~~: ~~t~~~'~~ 7-1/~ 5M drilling spooi & 7-1/16" 5M gate valve. \ 'V Nk;' 1/ [ If ttt -Þ-v ~ ~:-- ::. L . fL-ý Ç,. (c¡.<, 'I)L~!t {¿~~ (¿. 5 Schrader Bluff S Pad Development MPS-15i Drilling Permit 4- ft.( S (.v" "t~i:.."~ { i Lf l.l... 22. Test wellhead equipment to þ,500 psi 23. Install back pressure valve 24. RD/MO 5.3. Post Rig Work 1. 2. 3. Perform CBL log Move in Klondike #1 work platform NU 7-1/16" 5M BOP stack and test blind/shear rams 250 psi low; 4,000 psi high and test the annular to 250 psi low and 1,000 psi high. Pull BPV Rig up and run 1-1/2", 2.4ppf, N-80, 10 rd EUE, with Seismic cable and Geophones strapped to the outside of the tubing to TO. Land tubing in split bowl on top of the annular. Install valve in top of 1-1/2" tubing and test same with nitrogen to 90 psi RD Klondike and support equipment and move off 4. 5. 6. 7. 8. 6 BP EXPLORATION Milne Point Unit MPS-15i Field: Milne Point Well: S-1Si Actual Surface Location: 4286' FSL, 205' FEL Bottom Hole Location: 3322 FSL, 136' FEL Status: New Development DIRECTIONAL LWD DEPTH MD I TVD HOLE SIZE OPEN HOLE LOGGING FORM NONE ;~i 110' ';,1 ":.~.i~, :':1 :~;I\::¡~ 1,815' :X;j~ 'I',' ~~~ I.II.~ ~t\it 2.482' :'j~~$: -- : ~;~(~~~ ! ~;~ ~;f;: .~~. :;:{);: ii~,: ,:~::' ':{(''" ~!\::. ':~,:II ,I,:~ ,I :'~I' ~~, 12-114" NONE 110' Base of Permafrost 1,824' MWDIDIRlGR PEX-Sonic Dipole Sonic 2,548' Top of Tail Cement ç9 :"" :) Top of N sand 4,257' 4,032' ' . MWDIDIRlGR PEX-Somc Dipole Some : 60 SWC's .. , . OA sand 4.416' 4,192' OB sand 4.484' 4,260' ,~ TD 4,653' 4,428' " 12/1812001 :t ... ,.., CASING SPECS 42" 20" 92#, H 40 Welded Surface Casing 9 5/8" 40# L-80 BTC 8-112" Production Casing ì' 26# L-80 BTC RaUl .'~..8U.G&MÆUS ENG: Steve Campbell RIG: Nabors 27E MSL: 34.5 RKB: 68 MUD INFO PIT INFO MW=9.1 ppg MW = 9.2 ppg INFORMATION Wellhead FMC Gen 5 20" x 11" 5M Cameron 3-1/8" tree KOP @ 300' AA=8 EOB@1750' MD 1742' TVD SB @ 2015' MD 2000' TVD EOB @ 2548' 2482' TVD AA=35 SOD @ 3046' MD 2888 'TVD Vertical @ 4117' MD 3892' TVD MPS-151 well plan schematJc2.xls ö "-'MI'......... 1M ,...", Ell' ",n.... ('II.."LaI""1 MrUul ~nrftll'l'l ( \8''''11\11\' rnl" S>*," I''-W'" ~n McduJ 1n.. I )1"\"1 N."C1b l m... ~~... 111..~1. CIb." ~'.m,~ 1.1«"'" RuIM rw..1 0 be R! 11 R!:NIT INH>R.M.... IllIN (,....""'08" IN [I Ror........ Wotl Cc:n<re "lID MI~ I'. lrue "'-..... VatIaIlln'll¡ Ror......,. S.r..J u.. 72 ,,, So.looQIVSIRor.r...... S",". IUI1!INOIJI>[, M....,re.I ['< <II rulenn. S.Pod Dr> 72 ". (.....IIIIITI Mett..d MnrroItlCID'\'8t1ft All TVD depths are ssTVD plus 72' for RKBE. SIan Dlr 11100' .H\O' MD. 300TVD ....- - : ~OO. 700 , 00 1000' : S1 art þ1f 21100' 1200' MD. 1199 WTVD ~-- - I I 1400 ,8° , ,I SOl, ¡¡od D,r 17~0' MD. 1742.71' TVD ~ it: 8 ~ 2100 ~ ~ i Ë > I 2 I- ¡ 2800 .~~OO 42no - . HIRY[, "RI (,RAI.4 ["'tOI>lm Do.'J"I'I.' S~1"", nfl' t!.lllr.1 1"",1 "-tIIU) rLlrn:d M~$" Wp1\ VI ""H~ 1'!lmeJ.I.4I'S-I' INr'" VI rnJJY}l!I"'"~ MWIJ.IIT<.M< Nun< .N'.~ "'''''''111' ~I"" MI'~ I~ W!",1 11'1.., MI'~.I< I'I"" Mf'~ I~I Cr",,',.,j Rt t..... 1\11"" [).'< 1 ]'4 '111111 .E.1W F"I.l[¡MJ"S-11; It, 7'1 -47'.1 '~I; '\~.lHI l hn.k('d U.slê' Nom. f"'ll .N.S Rt'Ut\!.o¡;d [)dlt" --- - - Mf"$ II; II 41112'1"1 W-4I( SECTION DETAILS "IW41 \1-"," "Hi 'II, h.omr --- ----- - --- WUI rlf'AIL~ ''''on¡¡ L.øll!u<k I "'fIic1W.\: ~.... V,"g7\..." 7(J24,74~J04 14'-I"274,1('7("w N.A ¡ ...R(,[ I [III"' [" .[..W ""'''1' 'I"'J'C No"""'''' See MD Inc Azi TVD tN/-S tE'.l.W Dleg T Face VSec Targ~1 I 72.00 0.00 355.88 7200 o.on 000 0.00 0.00 0.00 2 300.00 00(1 0.00 300.00 0.00 000 o.no 0.00 0.00 3 60000 3.00 16~ 00 599.86 .7.~8 2.03 100 165.00 .7.71 4 90ll.00 0.00 0.00 89Q. 7 3 -15 17 4.06 Ion 1t<000 .1 ~ 42 5 1200.(10 3.00 355.71 1199.59 -734 3.48 1.00 3~5.71 - 7.57 6 1750 (10 14.00 .~55.71 1742.71 n-óO .2 ~9 2.00 0.00 7.\.flO 7 2015.16 1400 355.71 2000.00 r .n.57 -739 o.on 0.00 137.75 '\ S"f ~ --,. 8 2548.4\ 3~..~3 355.7\ 2481.80 358.20 -23.Q5 4.00 0.00 358.Q9 9 3046.2(1 3~.33 35571 2887.96 645.29 -45.48 0.00 0.00 646.89 10 4116.86 0.00 -'5~.71 3892.00 964.15 -b9.41 3.30 180.00 9M.b4 II 44liJ.8b 0.00 355.71 419200 964.15 .69.41 0.00 000 96b.b4 MPS.\5TI 12 4502.86 0.00 355.71 4278.00 964.15 -(1941 000 355.71 96b ó4 13 4652.8(1 0.00 355.71 4428 00 964.15 -(1<141 0.00 3~5.71 %664 CASING DE1,b,llS No. TVD MD Name Size 4427.9<1 4t1~2.8 ~ 7" 7000 ':. ~ " 2015.16' MD, 2000'TVD EhdD,r :H4f<.41'MD,24818'TVD ...............~- 0 i -- r-; i I ::>Ian J,r .1..~1[l1I': 304b 26' MD. 2887.96'TVD i _I 1 I l- I ¡ r - I J ;---~-- \ ! i , ::, liøp-1..~U !- ~o ¡ -J' - - ,. , Schrader N,b, : J- E~d- Di 1- : 4116.86' MD, 3892' ~~'I?.-- -_: Schrader NB 4000 J ' .- -' - --- Schrader NC ¿n" "{op lIpIU M---- ---:.:=-~:==----~ Schrader NE I r - I - -- .t-:c-:-- - :::---- ---- Schrader NF I --~t::::=-:::::.--=====--= TSBD-OA -.~~.l-~ -====-- - TSBC(ba.c:eOA) . --- ~ - TSBB-OB : :- SBA~ (bJ!>e OBI 4500, I ' -L T -' -- .U ' : 7" , -:- T'ural Depth : 4(1~2 8(1' MD. 442 !' TVD 700 I 14[10 I 2100 Venlcal Sec,,,,n at .I~~ BB" 700A.lm :~ : 0 (fJ IrI II I {I I' I I I I , i ~\ /..5'00 /000 4' $00 ~ '..5"00 FORMATION TOP DETAJLS Nl1 T VDPalh MDPalh Forma[lon .1~28 00 37~0.14 T lIP Ugnu .W29.00 41 53.86 Top Ugnu M .~ 4039.00 4263.86 Schrader N.<\ 4 4066.00 4290.86 Schrader NB ~ 4102 00 4326.86 Schrader NC 6 4118.00 4342.86 Schrader NE 7 4162.00 4386.86 Schrader N F 8 4192 00 4416.86 TSBD-OA q 4229.00 4453.8b TSBC (bØ!>e OM 10 4260.00 4484.86 TSBB-OB II 4278.00 4502.86 SBA5 (b.1.c:e OBI d 1000 c ~ ~ 600 ¡- ::;: t: c:. ~ ..c :; 0 !J) 400 ( MI''''''''''I~ I^II' kf 11 RI loin INfORM... I !'IN ~IIR,'l \' (.¡,. '.."AM PI...-, 1'.1"<; I\Wr"\II'I.",MI'S 1\/I'I3ßMP~ 1\, I,~.r rH" 1\"",.. ("'-I"dIlJolICI""FIR~(...R:Ð.~ w~nf~ rIat.M~I(.lna-Nllrrb V"""",JV\), Ror......, s-rld [I.. 72 UI> ~h.1Q .VSI Rtftrerce' S¡''II. (0 (fiN (l'lt"l( I M<&.<U.-.d IJorlh Ro"""".. S-r.I Dr> 72 ,., r."""\ILlI..~ MC'b-1 "hŒn.I.m,~w\"bJn; ., (J. ~1"lr"'l U~'f'ltl IITI LJr."J'II11.... SI.D"\\") rL...r, It..lt" -- i u..ulal.... MIL'tJ'u1 Mn..rrurr, ( u.r'\lrun: ::c:: ~ ~~~V;:~~ ~.ul rm. Surfa.." .III~I l bd'(I W.m,~ "'ctI,.1 R".....lIaxot ~5% cenf. , . <~:O-:'-'-- , MP6 15 \VpO~ T olal )eplh : 4f)~2 86' MD, 4428' T VD " I 4000 TT JJlPS-1 5 T , II.. .'500 End Dlr . 411686'MD, 3892'TVD -.. 80{l 3000 - Sran Dlr:l 31100" 304fi 26' MD. 288796'1 \'D 2500 I - End Dir . 2~~8 41' ~1Q, ?481.8' TVD 200 2{tOO - Sian Olr 41100' 2015 ¡"(þ' MD, 2000TVD - End D1I1750' MD, 1M2 71' TVD 0 1500 500 . Sian Dir . I (){I' : .'O{l' MD. 300TVD lono ~ ~ drt U,I ¿I Ull": ILlllI"MO. 1/99 5Q'TVD .200 0 200 WeSI(-)IEa~I(+ (200Mn CASING DETAJLS No. TVD MD Namr 4427.99 465285 7" FORMATION TOP DETAILS No. TVDPalh MDPalh FOnTI31ion I 3528.00 3750.14 Top Ugnu 2 3929.00 4153.86 Top Ugnu M 3 4039.00 4263.86 Schrader NA 4 4066.00 4290.86 Sthrader NB 5 4102.00 4326.86 Schrader NC 6 4118.00 4342.86 Schrader NE 7 4162.00 4386.Sb Schrader Nf 8 4192.0{l 4416.86 TSBD-OA 9 4229.00 4453.86 TSBC (ba..<.e OA I 10 426£1.00 4484.86 TSBB-OB II 4278.00 4502 86 SBA5 (ba.<.e OB) I "rc.JlñJ Uy ¡";'c,YI A..IIð1 nodi.: I 2-'4 '~IIIII f(.lfllll Pk.fDe\1 ~r~l( "('ill VI 4"')~" l'l.me.I ~I~I' "'1"'1 \'1 r1u.YRfJ ~s MWII 11".1-1-' [).tl(' I h" ~,-J RC'\lnlq,.-\.I wnl LWT¡\..II~ Size N,lnr 'I'<.S '¡:.W 1IIo_"!' L4<11I1 1 Lallru.k L~u!Jr.1r Sk. f'br.MKI' If.'1!l -4'IIf 4. C,yyiNlf} HI 1iI.(kJ"If. 1tr-].P74' 4N 1~1I"]74X",7r.w 1'<." I",kr.¡ 111[1^IL;. Now- TV[I -N., [, v.' N.y'U.rr'F l.a..oJr1p ~h.'r"Iõ ~H'S I'll JI(ø} '.11 Qf'.4I' .J.'J-II ",..,.,,,...,.. \r.li.1w. [Jr, C.I".l rlY-.t.1.Oo I 'II SE.CTION DE-TAILS 5..., MD Inc ð,zi TVD +NI.S +E.J-W DLeg T Face VSec , 1200 0.110 355.88 72.£10 (i fin 00[1 (I £In 00[1 (100 2 .'on.nll (100 0 no 30n.oo n.oo 000 0.00 0.00 {Ion 3 (,(IO{l(¡ Ulll 165.00 549.86 -7.58 2 OJ 100 16500 -771 4 4(¡no(¡ 000 0.00 84Q" .15.17 4 11(. 1.00 180.£10 .15.42 5 1200 £Ill 3.£10 .'55.71 1199.54 . 7 .'4 'AX 1.00 .'55.71 - 7.57 6 17500£1 14 llO 355.71 1742.71 B.W .254 2 no 0.00 73 60 7 2015 If> 14.00 355.71 2000.00 1J7.57 .7.YJ 0.00 0.00 IJ 7.75 8 2548 41 .'5.33 35571 2481.8(¡ .'582£1 .1.' 45 4.00 £I 00 358 99 9 304b 2ó 3533 355.71 2iC87.Q6 645.2'1 -45.48 0.00 0.00 b4ó.8Q 10 411b 86 000 355.71 .'892.00 904.15 -69.41 .UO I Rn.OIl 9f>b.M II 4416.86 000 355.71 4192 00 Q04.15 -ó9.41 0.00 o.on 966.64 12 45f12 86 0.00 355.7\ 427800 964.15 -69.41 0.00 35571 9bb 64 IJ 4652 86 000 35571 4428.00 9(>4.15 -69.41 0.00 355.71 966 64 MPS-15TI 7.000 T argc:1 /" ./ " .,/ / / / // / :,A 0 # ,rI ,ifIJ I' {I I . ø /' ÂJ ,// // 1"1 /./ '/-/" / /.7 / ç I /. //. ~ / I \: ' :-~ All TVD depths are ssTVD plus 72' for RKBE. I 40£1 ).2Q / Vo / <5'/'> / /. </0 / /a // Vo .,/" .5'00 ~~ ~ /0 ~ / .s§? '$a ~- v / / ~ BP Amoco Planning Report - Geographic ,.-.-.----..-- ---'----------- .- ---------.-----"- -- ------ --- -----.-- i Company: BP Amoco ; Field: Milne Point 'I Site: M Pt S Pad Working Well: Plan MPS-15 I, ~e!I~I!!~~-!~n ~~~;.~5,c._:: -'. Date: 12/4/2001 Time: 09:52:01 Page: Co-ordlnate(NE) Reference: Well: Plan MPS-15, True North Vertical (TV D) Reference: S-Pad Dev 72.0 Section (VS) Reference: Well (0.00N,O.00E,355.88Azi) Plan: MPS-15 Wp03 . -.-- '---_-.-_0_..__.-.- ---- -. - .0_- -----------"-------- -.--- --- - -" - --- ..- -.--..-.. .".- . - ... . -- - '----'-"---'---'--.'" ----.-..------...- -- Milne Point North Slope UNITED STATES : Map Slstem:US State Plane Coordinate System 1927 I Goo Datum: NAD27 (Clarke 1866) : S)'S Datum: ~.~an_~~~. Level Field: Map Zone: Coordinate System: Geomagnetic Model: Alaska, Zone 4 Well Centre BGGM2001 -- -. - - - -- ¡ Site: M Pt S Pad Working Site Position: From: Map Position Uncertaint)': Ground Le\ el: Northing: 5999978.00 ft latitude: Easting: 566345.00 ft Longitude: North Reference: Grid COD\'ergence: .-.--- ---..- . ..- - - ---- .----.----.., ---.---- --.._-- - --.. -.- --- ---.. --- 0.00 ft 0.00 ft 70 24 37.329 N 149 27 35.171 W True 0.51 deg --._-_.-- --.. -- -_. -. -..-. - -- -- ..--- -.-. ---. . -- --.- - . _.~ ..-. ..-- -- - --.-. -- --.--- --.------_._---_.-. ---.-- ---- -. -. - - -. - '-' -" - - - -- ¡ Well: Plan MPS-15 Slot Name: I I Surface Position: I I I +N/-S 16.79 ft Northing: 5999990.60 ft +E/-W -470.95 ft Easting: 565873.96 ft Position lIncertalnt)': 0.00 ft Reference Point: +N/-S 16.79 ft Northing: 5999990.60 ft +E/-W -470.95 ft Easting: 565873.96 ft Measured Depth: 72.00 ft Vertical Depth: 72.00 ft Latitude: Longitude: 70 24 37.494 N 149 27 48.975 W 70 24 37.494 N 149 27 48.975 W 0.00 deg 0.00 deg , ---.----- -_. ---- -. -- -- - - - Latitude: Longitude: Inclination: Azimuth: - - - -.- --- _._-. - - - - '- .-_. --.-..- --.------.----- --. -- -- ---- -.-------- !- "'~lIpath~ -PI~~ MPŠ~15- - - --. . -- ----- - - -'~-- - -. - .- --- -- -..-.------- --------- ---- - _. .- --- -- -.- Drilled From: Well Ref. Point Tie-on Depth: 0.00 ft ! Current Datum: S-Pad Dev Height 72.00 ft Abo\'e S)'stem Datum: Mean Sea Level : Magnetic Data: 6/29/2001 Declination: 26.28 deg I Field Strength: 57460 nT Mag Dip Angle: 80.78 deg I Vertical Section: Depth From (T\'D) +N/-S +E/-W Direction , I ft ft ft deg ¡ l-.-,"-- - :--:-~-~.--- ~-~~-=-~.--Õ.~~~ --~--~--.~ ~~-.:_-~~ßO-.~---- -~----O~O.~~----'--~__-35i88 ------=--=--.~=~=~-~: =.1 i--PI~~~" __-_n -MPS--15 Wp03 -. ----------- -------- -[);te Coo~posed: 12/4/200"--------- I Version: 1 i _~r~~d~~_~~S- ----------------------.- ---, - ~~~d~~~__. __~rom: Definitive Path ------- h_- _____.1 Plan Section Information I ------- -==~] !\ID Incl Azlm TVD +N/-S +E/-W DLS Build Turn TFO Target ft deg deg ft ft ft deg/10OO deg/100ft deg/10OO deg -_..------ --- -- 72.00 0.00 355.88 72.00 0.00 0,00 0,00 0.00 0.00 0.00 I 300.00 0.00 0.00 300.00 0.00 0.00 0.00 0.00 0.00 0.00 i 600.00 3.00 165.00 599.86 -7.58 2.03 1,00 1.00 0.00 165.00 900.00 0.00 0.00 899.73 -15.17 4.06 1.00 -1.00 -55.00 180.00 1200.00 3,00 355.71 1199.59 -7.34 3.48 1.00 1.00 0.00 355.71 ~ 1750.00 14.00 355.71 1742.71 73.60 -2.59 2.00 2.00 0.00 0.00 i 2015.16 14.00 355.71 2000.00 137.57 -7.39 0.00 0.00 0.00 0.00 2548.41 35.33 355.71 2481.80 358.20 -23.95 4.00 4.00 0.00 0.00 3046.26 35.33 355.71 2887.96 645.29 -45.48 0.00 0.00 0.00 0.00 4116.86 0.00 355.71 3892,00 964.15 -69.41 3.30 -3.30 0.00 180.00 I 4416.86 0.00 355.71 4192.00 964.15 -69.41 0.00 0.00 0.00 0.00 MPS-15 T1 4502.86 0.00 355.71 4278.00 964.15 -69.41 0.00 0.00 0.00 355.71 4652.86 0.00 355.71 4428.00 964.15 -69.41 0.00 0.00 0.00 355.71 ._----_.- .. - ---- ----. .-- - --.- - - -- - - -. --- - ---. -.. --- -- - -.-.-- - -- - - -- -- .-- Section 1: Start -- ---- --------------------- ----~---- ----- . ----------- MD Incl Azim TVD ft deg deg ft -- -- - -' '-'- ------------'--0_- 72.00 0.00 355.88 72.00 100.00 0.00 0.00 100.00 200.00 0.00 0.00 200.00 300.00 0.00 0.00 300.00 +N/-S ft 0.00 0.00 0.00 0.00 +EI-W \'S DLS Build Turn TFO ft ft deg/100ft deg/100ft degl1000 deg --------_.------------- ----------------------- - 0.00 000 0.00 0 00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 000 0.00 0.00 0.00 0.00 0.00 -- ---- ---- -- ------...---. BP Amoco Planning Report - Geographic - . ---- .._- -- _.._._-~. - - --4_--'-_- --- . -- -. .--- - -- --~ -.- -"'--..- Company: BP Amoco Field: Milne Point Site: M Pt S Pad Working Well: Plan MPS-15 Wellpath: Plan MPS-15 . "-- ----~.._----_.~_._-_...---~ - ~_.._._- ------- ---.. - --.. --- Date: 12/4/2001 Time: 09:52:01 Page: Co-ordinate(NE) Reference: Well: Plan MPS-15. True North Vertical (TVD) Reference: S-Pad Dev 72.0 Section (VS) Reference: Well (O,OON,0.00E.355.88Azi) Plan: MPS-15 Wp03 .. -. --.. .--- .__..~-- ----. --- --- .. .. -- ..-----.----------- --------.. --- ---__0-' --_...--_.-- '-.. Section 2: Start - --.. ---..-------.. --- ._- . ------.-- - .----. ..---.----. .-- ----- 2 +N/-S ft ---- .--...- .-_.. -0,84 -3,37 -7.58 VS----.--DLS--B~d-- Tur-~-----TFO---- ------- ---I ft deg/1000 deg/100ft deg/1000 deg I '-. ,--- ,------------ - ----.- . - ----.--- ------.- --_.- --- --_J -0.86 1,00 1.00 0,00 0,00 -3.43 1,00 1.00 0.00 0.00 -7,71 1,00 1.00 0,00 0,00 1\10 Incl ft deg . '--0- -.- . - - .-_. 400 00 1.00 500.00 2,00 600.00 3,00 Azim deg 165.00 165.00 165,00 TVD ft . --_. -- -- 399,99 499.96 599.86 +E/-W ft . - - ---- 0,23 0,90 2,03 -- - --- . ... . -- ----'- ---- Section 3: Start ---- -l\ïD--.----i;~I-. --- -Ãzim ----. .-T\'D----+Ñi~Š---- - +E/~"'- .-.- VS--OLS Build -'¡'ur~--TFO------- - - ----I ft deg deg ft ft ft ft deg/100ft deg/1000 deg/1000 deg I -_.-- ----.---.- -- ---------------.--.----------------------------- -. --- ----.--1 700,00 2.00 165,00 699,76 -11.79 3,16 -11,99 1,00 -1.00 0,00 180,00 800.00 1,00 165,00 799,73 -14,32 3,84 -14.56 1,00 -1,00 0,00 180.00 900.00 0.00 0.00 899,73 -15.17 4,06 -15.42 1,00 -1.00 0,00 -180.00 ._---.. ---- ..---- .-- -- --.- ----.- -.---------..--------. .. - - - --- .----.-----.--------.---------.----..----. -- -.------ Section 4: Start l=-~~()=~;~-~---;:~~--=-T~D-~N~S _+it~~--'i ----';~~:00f\ :;:I~OOll~~- ~~--===] '1000.00 1.00 355.71 999,72 -14.30 3,99 -14.55 1,00 1,00 0,00 0,00 '1100.00 2,00 355.71 1099,69 -11,69 3,80 -11,93 1.00 1,00 0,00 0.00 : 1200,00 3,00 355,71 1199.59 -7,34 3.48 -7.57 1.00 1,00 0,00 0,00 - --.-. -----. ..--- --. -. --. -- - - - -_. --- --. .------ -.- - -------.. - -- - -- .-.-------w--- ------------------.. - -- --- -.--.- - -- - Section 5: Start ---. --------- ---.-----.. -------.--- ------.---- MD Incl Azim T\'D +N/-S +E/-W \'S ft deg deg ft ft ft ft 1____._- --- --.---- - .- ---.. -- -- ---- ------.---- -----._- 1300,00 5.00 355.71 1299,34 -0,38 2.96 -0,60 : 1400.00 7,00 355.71 1398,79 10,04 2,18 9.86 I 1500,00 9.00 355.71 1497,81 23,92 1.14 23.77 I 1600.00 11,00 355.71 1596,29 41.23 -0,16 41.14 1700.00 13.00 355.71 1694,10 61.96 -1.72 61.93 l._1?5~,~0_.___~4,O_0- ----~~!~- -- _1~~~,!_~---~~,~~_---_~2_.~9 ---- !3~~ Section 6: Start ---_._----~------------- ------ i MD Incl Azim TVD +N/-S +E/-W VS I ft deg deg ft ft ft ft !--,ooõ,oo 1~355.71-- 1791.22 85.66 -3.49 85,69 : 1900,00 14,00 355,71 1888.25 109,79 -5,30 109,88 i 2000.00 14.00 355,71 1985.28 133.91 -7,11 134,08 1_}_~1 ~..~---~-~.~O_- ~~,71~?~:.0~_~?..57 -7,39__~_~7..:_~5 Section 7: Start [---~~._--~:_~-- ;~-~=~~~---- +N:~--- +Elfi:___- ~S : 2100,00 17.39 355,71 2081.66 160.46 -9.11 160,70 '2200,00 21.39 355,71 2175,97 193.56 -11.59 193.89 i 2300,00 25,39 355.71 2267.73 233.15 -14.56 233,59 ; 2400,00 29.39 355,71 2356.50 279,02 -18,00 279,59 ,2500.00 33,39 355.71 2441.84 330.95 -21.90 331.67 2548,41 35,33 355,71 2481,80 358.20 -23.95 359,00 -------"-- DLS Build Turn TFO I deg/100ft deg/1000 deg/10OO - deg ---- ----J 2.00 2,00 0,00 0.00 2,00 2,00 0,00 0,00 2.00 2,00 0,00 0,00 2,00 2.00 0,00 0.00 2,00 2,00 0,00 0.00 2.00 2.00 0,00 0,00 ------------ ----.--- -- - - -~ -- --- DLS Build Turn deg/1000 deg/1000 deg/1000 0.00 0.00 0.00 0.00 0.00 0.00 0,00 0.00 0.00 0.00 0.00 0.00 TFO deg 0.00 0.00 0,00 0.00 ------- DLS Build Turn TFO deg/100ft deg/1000 deg/10OO deg -----.--- 4.00 4.00 0,00 0,00 4,00 4.00 0,00 0,00 4,00 4.00 0,00 0,00 4,00 4,00 0,00 0,00 4.00 4,00 0,00 0,00 4.00 4.00 0.00 0,00 - _._-.----- -- - -. -- -- - .--- --- .-.- ._- ---- - -._--- . --- -. -- - - - -- ----- ¡ ----~ I ------_J --I I ----~ Section 8: Start -.- ---- .- -'------ --_._-----.- ------.. -- ------------------------ ---------------------------"---- MD Incl Azim TVD +N/-S +EI-W VS DLS Build Turn TFO . - - - ft_-_._-~~--- - deg - ---- ~- ft .--- - -~-_._--~-- deg/100!t_~~/1000 d~10OO___- deg- ------ ------ .-: 2600,00 35,33 355.71 2523.89 387.95 -26.18 388,83 0.00 0.00 0,00 0,00 2700,00 35.33 355.71 2605.47 445,62 -30.51 446.66 0,00 0.00 0,00 0.00 2800.00 35.33 35571 2687.06 503.28 -34.83 504.49 0,00 0.00 0,00 0.00 2900.00 35.33 355.71 2768,64 560.95 -39.16 562,31 0.00 0.00 0,00 0,00 3000,00 35.33 355,71 2850.22 618.62 -43,49 620.14 0.00 0.00 0.00 0.00 3046.26 35.33 355.71 2887.96 645.29 -45,48 646.89 0,00 0.00 0.00 0.00 -- -- - - - - un -- - - -- - - - - - - - -. - - BP Amoco Planning Report - Geographic _.. -- --- . . .---- -- . --. -------- -- - .-.-, .---- ------..--.---.. - - -- - -- ----- ---. --- --- ------- ----._-- -"."--- - -. _.._~._---------- I Company: BPAmoco Date: 12/4/2001 Time: 09:52:01 Page: 3 Field: Milne Point Co-ordlnate(NE) Referenc:e: Well: Plan MPS-15, True North Site: M Pt S Pad Working Vertical (rVD) Reference: S-Pad Dev 72.0 Well: Plan MPS-15 Section (\'S) Reference: Well (0.OON.0.00E.355.88Azi) i I Wellpath: Plan MPS-15 Plan: MPS-15 Wp03 ._..1 I - ~- - - .. ... - - . - - --- - - -.. - ---' - . - --' - . --. -...- -.- ..-- - "--.. ---....,.--.. --- . . -" -. --. . .-- -. - ..~--_._-- -- ~--------- ---". -- ------ -- .--- . . ---- .-----. Section 9: Start - - -'----- - -- '--' ...---..- - -- -.--..-.-- .._. - - ---........ ----- ---------_.. 4- .-. --_...- -.------.--.- ------ -I l\1D Incl Azim T\'D +N/-S +E/-W \'S DLS Build Turn TFO ~ ft deg deg ft ft ft ft deg/1000 deg/100ft deg/1000 deg - - - .-- - - - ----- -- _.- .... -- .-- --... -".. -. _.- ----~ ------ -.. -- - -- -.- --~.__. - --_._------------ . _._._-'~- ------ .------ - - --.- -- - 3100,00 33,56 355,71 2932.28 675,60 -47.75 677 .28 3,30 -3,30 0,00 180,00 3200.00 30,26 355,71 3017.16 728,30 -51,71 730,13 3,30 -3,30 0,00 180.00 I 3300.00 26,96 355.71 3104.94 776.04 -55.29 778.00 3.30 -3.30 0,00 180,00 I 3400,00 23,66 355.71 3195.33 818.66 -58.49 820,74 3,30 -3.30 0,00 180,00 I 3500,00 20.36 355.71 3288.03 856.02 -61,29 858.21 3,30 -3,30 0,00 180.00 I I 3600.00 17.06 355,71 3382,73 887.99 -63,69 890,28 3,30 -3.30 0.00 180,00 ; 3700.00 13,76 355,71 3479.13 914,48 -65.67 916,84 3,30 -3,30 0.00 180,00 3800,00 10.46 355.71 3576.89 935,39 -67.24 937,81 3,30 -3.30 0.00 180,00 I 3900,00 7,16 355.71 3675.70 950.66 -68.39 953.12 3.30 -3.30 0,00 180,00 i 4000,00 3,86 355.71 3775,22 960.23 -69,11 962.71 3.30 -3.30 0,00 180.00 i 4100.00 0.56 355,71 3875,13 964,07 -69,39 966.56 3.30 -3,30 0,00 180,00 j 4116,86 0,00 355,71 3892.00 964,15 -69.41 966.65 3.30 -3,30 0,00 -180.00 - -- - .- -. ---- - - - - - ..- .-.--- .~_. - --- ----. --.- .--- -- - -.---- -- -. -----'----------.---' -.--. -- _. - -. ...- -..- ._- - - Section 10: Start ~ - --' '~IÌ>-- - -- i~~I-_u Azlm T\'D -----¡-N1=S +E/:\\~--VS---Dis-- Build -_. Tur~--- i-FO-- ----. ---- -', : -- - -~ ._--_<!.~-- ---~~-------~---~--- -~----_._~__~eg/~Oft deg/100ft d_eg/10OO ___~eg ----- -----_J '4200,00 0.00 355.71 3975.14 964,15 -69.41 966.65 0.00 0,00 0,00 355,71 4300,00 0.00 355,71 4075.14 964,15 -69.41 966,65 0,00 0,00 0.00 355.71 4400.00 0,00 355,71 4175.14 964,15 -69.41 966.65 0.00 0,00 0.00 355.71 4416.86 0.00 355.71 4192,00 964.15 -69.41 966.65 0.00 0,00 0,00 355.71 - --.-. --. ----_.- -- -- ---. - -- -- - ----- - -. --- --------- -- - -_. - -.- -- ---' -.- ---- .-- - - Section 11 : Start - -- - ~ïD- --'--;c'I------A;i;---------TVõ"- -'-+N/-S----¡Eï:v.---;----'-'V-S----DLS Bulld"--'¡'~;~~FO - ---- '-- ----I ¡ : --' _ft_--_u . ~~__h__~~' ..._--_!!.. ---- ----~--_._-~-------~_.__~eg/1~~ d~g/10~~~/10OO deg ---~ 4502.86 0.00 355.71 4278.00 964,15 -69,41 966,65 0,00 0.00 0,00 355.71 - - - . -. -. .-.- .._- -.-..-------- -' -.- .---------.-- - -----.----'-- --- .--- -------_._-- Section 12: Start - --M"ö---i.;cl-A;im---TVD-+N/-S--:;['-W--VS-- DLS Bulld~u-;;--TFO -- -I '_n__~.______d~_. deg -- ft ft ft ---~- deg/100ft deg/100ft deg/1000 - deg -----_.~ I 4600.00 0,00 355,71 4375.14 964,15 -69.41 966,65 0.00 0.00 0.00 355.71 i 4652.86 - O..O~-_.- - -~~~!~- --~~~:~~___~~~1~- -- ~?~_~~_~66.~__- 0.00 --~,~O_-- _0.~_~___~5~:~___--- ---1 Sun'ey (------ I I\ID Incl I ft deg 1- ------ ! 72,00 0,00 100.00 0.00 200.00 0,00 300.00 0.00 400,00 1,00 500.00 600,00 700.00 800.00 900.00 1000.00 1100,00 1200.00 1300.00 1400.00 1500.00 1600.00 1700.00 1750,00 1800.00 2.00 3.00 2.00 1.00 0.00 1,00 2.00 3.00 5.00 7.00 9.00 11,00 13.00 14.00 14,00 Azlm deg 355.88 0,00 0.00 0,00 165,00 165,00 165.00 165.00 165,00 0.00 355.71 355.71 355.71 355.71 355.71 355.71 355,71 355,71 355.71 355.71 TVD ft 72.00 100,00 200,00 300,00 399,99 499.96 599,86 699,76 799,73 899.73 999.72 1099,69 1199.59 1299.34 1398.79 1497.81 1596.29 1694,10 1742.71 1791.22 ----_._-------þ-------------- +N/-S ft 0,00 0.00 0,00 0.00 -0.84 -3,37 -7.58 -11 .79 -14,32 -15,17 -14.30 -11.69 -7,34 -0,38 10,04 23.92 41.23 61,96 73.60 85.66 +E/-W ft 0.00 0,00 0,00 0.00 0,23 Map Northing ft 5999990.60 5999990.60 5999990,60 5999990.60 5999989,76 Map Easting ft 565873,96 565873.96 565873.96 565873,96 565874,19 0.90 5999987.24 565874.89 2.03 5999983.04 565876,06 3.16 5999978,84 565877.22 3.84 5999976.31 565877,92 4.06 5999975.47 565878,15 3.99 5999976,34 565878,08 3,80 5999978.95 565877.86 3.48 5999983.29 565877 .50 2.96 5999990,24 565876.92 2.18 6000000,66 565876,05 1.14 6000014,52 565874,88 -0.16 6000031.82 565873,43 -1,72 6000052.54 565871 ,69 -2.59 6000064.17 565870.72 -3.49 6000076.22 565869.71 - - -. ---- - . -- - - -.- - ~ . <- Latitude --> <- Longitude -> Deg Min See Deg Min Sec ----- 70 24 37.494 N 149 27 70 24 37.494 N 149 27 70 24 37,494 N 149 27 70 24 37.494 N 149 27 70 24 37.485 N 149 27 48,975 W : 48.975 W I 48,975 W I 48,975 W I 48.968 W ! 70 24 37.460 N 149 27 48.948 W : 70 24 37.419 N 149 27 48.915 W ¡ 70 24 37,378 N 149 27 48,882 W ~ 70 24 37,353 N 149 27 48,862 W 70 24 37.344 N 149 27 48856 W 70 24 37,353 N 149 27 48.858 W 70 24 37379 N 149 27 48863 W 70 24 37.421 N 149 27 48,873 W 70 24 37.490 N 149 27 48.888 W 70 24 37,592 N 149 27 48.911 W 70 24 37.729 N 149 27 48,942 W 70 24 37.899 N 149 27 48.980 W 70 24 38.103 N 149 27 49.025 W 70 24 38.217 N 149 27 49,051 W 70 24 38336 N 149 27 49077 W BP Amoco Planning Report - Geographic ! ë~~~~~;;--èpA;~~-"--- ----- ----- ---------------------- ---------------------------------------- -- -~ --- ! Field: Milne Point ¡Site: M Pt S Pad Working : Well: Plan MPS-15 ! Wellpath: Plan MPS-15 .-.. -. -". . -. -" ---- --Þ ..- .--- -- ..-.--- - . "-- --. .--- -- --- -~- .. --"- -0 -. ----- _. - - - --.. -----". - ._--- -'-.--"-'-- . --..-. --.--- --. . Sun'e) - - .-- -----_. -.--- .-. . -. - -. -.-. --- .-- - -..- -- . ]\10 ft - -.. - - -.-- 1900.00 2000.00 2015.16 I 210000 2200 00 ~ 2300.00 : 2400.00 I 2500.00 2548.41 i 2600.00 2700.00 2800.00 2900.00 3000.00 3046.26 3100.00 3200.00 : 3300.00 , 3400,00 3500.00 I 3600.00 3700.00 3800.00 I 3900.00 : 4000.00 I I 4100.00 i 4116.86 I 4200.00 4300.00 I 4400.00 I 4416.86 I 4502,86 , 4600.00 ~ 4652.86 Incl Azim deg deg .- - -- _.- - -. ._._~ _.- .. 14.00 355.71 14,00 355,71 14,00 355.71 17.39 355.71 21,39 355.71 25,39 29,39 33,39 35.33 35,33 35,33 35,33 35,33 35,33 35,33 33.56 30,26 26,96 23.66 20.36 17,06 13,76 10.46 7.16 3,86 0,56 0,00 0,00 0,00 0.00 0,00 0.00 0,00 0,00 T\'D +N/-S ft ft . . -----.---.--- 1888,25 109.79 1985,28 133.91 2000.00 137,57 2081.66 160.46 2175,97 193.56 355,71 2267.73 355,71 2356,50 355,71 2441.84 355.71 2481.80 355,71 2523,89 355.71 2605.47 355.71 2687.06 355.71 2768.64 355,71 2850.22 355.71 2887,96 355.71 355.71 355.71 355.71 355,71 355.71 355,71 355,71 355,71 355.71 2932,28 3017,16 3104,94 3195.33 3288,03 3382.73 3479.13 3576.89 3675.70 3775.22 355,71 3875.13 355,71 3892.00 355.71 3975.14 355.71 4075.14 355,71 4175.14 355.71 4192.00 355,71 4278,00 355.71 4375,14 355,71 4428,00 - . -- - - -.. - -..- - -. - .- -." 233.15 279,02 330,95 358.20 387,95 445,62 503.28 560,95 618.62 645.29 675,60 728,30 776.04 818,66 856,02 887,99 914.48 935,39 950,66 960,23 964,07 964,15 964.15 964.15 964.15 964,15 964,15 964.15 964.15 Date: 12/4/2001 Time: 09:52:01 Page: Co-ordlnate(NE) Reference: Well: Plan MPS-15. True North Vertical (fVD) Reference: S-Pad Dev 72.0 Section (VS) Reference: Well (O.00N.O.00E.355.88Azi) Plan: MPS-15 Wp03 .1 --- . - - -- .-- . -" "-_. ----------.'-'--- --- --'----."-'".-----.. ----.- Map Map <- Latitude --> <- Longitude -> ¡ __~~~:I~~_--__~a~tl~g__- - ~__~~~n --~~-- -. ._~~g-~:~ . ~ec__- -- ¡ 6000100.33 565867,69 70 24 38,573 N 149 27 49.130 W 6000124,43 565865,67 70 24 38,811 N 149 27 49.183 W ' 6000128,09 565865.36 70 24 38,847 N 149 27 49.191 W : 6000150,95 565863,44 70 24 39.072 N 149 27 49.242 W i 6000184.03 565860,66 70 24 39.397 N 149 27 49.315 W +E/-W ft ..-.- W'- - - -.- -5.30 -7.11 -7.39 -9.11 -11,59 -14.56 6000223,59 565857.35 -18.00 6000269.42 565853.50 -21 ,90 6000321.32 565849.15 -23,95 6000348,54 565846,85 -26,18 6000378,27 565844,36 -30,51 6000435,89 565839.53 -34.83 6000493.51 565834,69 -39.16 6000551.13 565829.86 -43.49 6000608.75 565825.03 -45.48 6000635.40 565822,80 -47,75 6000665.69 565820.25 -51.71 6000718.34 565815.84 -55,29 6000766,04 565811,84 -58.49 6000808,63 565808,26 -61.29 6000845.96 565805,13 -63.69 6000877,91 565802.45 -65.67 6000904,38 565800,23 -67.24 6000925,28 565798.48 -68.39 6000940.53 565797.20 -69,11 6000950.09 565796.40 -69,39 6000953.93 565796.07 -69.41 6000954.01 565796.06 -69.41 6000954,01 565796,06 -69.41 6000954,01 565796,06 -69.41 6000954.01 565796.06 -69.41 6000954.01 565796,06 -69.41 6000954.01 565796,06 -69,41 6000954,01 565796,06 -69,41 6000954.01 565796,06 - .--..-- ---.- - -~ -."' _u- -- - - . - --- --'---"---------- - -. --.. - - . - - - - - ,- - ." - - . - - - . - - . -. . 70 24 39,787 N 149 27 49.402 W : 70 24 40,238 N 149 27 49.502 W ' 70 24 40.748 N 149 27 49,617 W I 70 24 41,016 N 149 27 49.677 W ! 70 24 41.309 N 149 27 49,742 W ' 70 24 41.876 N 149 27 49.869 W I 70 24 42,443 N 149 27 49,996 W 70 24 43.010 N 149 27 50,123 W 70 24 43,578 N 149 27 50,249 W 70 24 43,840 N 149 27 50,308 W 70 24 44,138 N 149 27 50.375 W 70 24 44.656 N 149 27 50.490 W 70 24 45.126 N 149 27 50,595 W 70 24 45.545 N 149 27 50,689 W ¡ 70 24 45.912 N 149 27 50.771 W ' 70 24 46.227 N 149 27 70 24 46.487 N 149 27 70 24 46,693 N 149 27 70 24 46,843 N 149 27 70 24 46.937 N 149 27 70 24 46,975 N 149 27 51.009 W 70 24 46.976 N 149 27 51.010 W 70 24 46.976 N 149 27 51.010 W 70 24 46.976 N 149 27 51,010 W 70 24 46,976 N 149 27 51,010 W 50,842 W 50.900 W i 50.946 W 50.980 W ¡ 51,001 W ! i I I I I 70 24 46,976 N 149 27 51,010 W 70 24 46,976 N 149 27 51.010 W 70 24 46,976 N 149 27 51,010 W 70 24 46,976 N 149 27 51.010 W BP Amoco Anticollision Report --------. -.--. ------- .----_. ----------- ---------- ---.- -- ------------------ Company: BP Amoco Field: Milne Point Reference Site: M Pt S Pad Working Co-ordinate(NE) Reference: Well: Plan MPS-15. True North ¡ Reference WeU: Plan MPS-15 Vertical (f\'D) Reference: S-Pad Dev 72.0 ¡, ~~~e~~~~~e~'-~~~~:7=--~~~~.~~~;~~- :._-:_--::.~:C_--c7=.-=-:--~_7~~_- _.--- - -----~-_. - .. - __m- ------------- --. Db: Oracle --- - . - .- R;¡:;ren~;:. - -- . --PI~~-:-MPS~1-5W¡;Ö3 & ÑOT Pi:ÃNNED*~OGR Error Model: ISCWSA Ellipse ¡ Scan !\Iethod: Trav Cylinder North ! - - . . - -. ~rro~_~~~f~~e.: - -- - ~I~ip_~~~. -~~~~~- - __I Date: 12/4/2001 Time: 09:35:29 Page: II NO GLOBAL SCAN: Using user defined selection & scan criteria Interpolation Method: MD Inten'al: 50.00 ft , Depth Range: 72,00 to 4652.86 ft Maximum Radius: 658.09 ft Casing Points . -.- - --.--------.. --- _a-_- -."-. -~ ~------- ---- - -.- --- -- .---' - -. -~_._-_._- .. -- --'-- "-' .--- -.-------------. - --- --- ---------1 -.-----------.---.---. -0_--- ---,--- ,- -"----"---'\ -- ----- -- _J !\tD TVD Diameter Hole Size ft ft in in I 4652:85"----44"27-,99 -- ---7.0ÕC)"-- .-- - -ã,söõ- - -7"--- - . Name . - -- - - - .-.-.. -- - - - ---------- ------------ ---.- -- ¡Plan: - -. - ..-- -- -.- -.- --.-- - - ---- . - -. - . - - - - - ~- - -- ----.--- - .-----.------------.- - -- - .----- ----._----._-- I MPS-15 Wp03 Date Composed: 12/4/2001 I. ~r~_(~pal:. Version: 1 Yes Tied-to: From: Definitive Path _. ---.----- - - -- - - - -.-- ----- -. --. - ----. ----'--'- n- Summa!)' --_. ----'----- ---- r~ Offset WeJlpath > Reference Offset Ctr-Ctr No-Go Allowable Site Well Wellpatb MD MD Distance Area De\'iatlon Warning ft ft ft ft ft -----------.----.----.-------.-------- --- M Pt S Pad Working MPS-Amold Plan MPS-Amold V4 Pia 698,93 700.00 212.02 13,90 198.13 Pass: Major Risk M Pt S Pad Working MPS-Amold Plan#1 MPS-ArnoldAL2 V 698.93 700.00 212,02 13.83 198,19 Pass: Major Risk : M Pt S Pad Working MPS-Amold Plan#1 MPS-AmoldAL3 V 698.93 700,00 212.02 13,83 198.19 Pass: Major Risk i M Pt S Pad Working MPS-Amold Plan#2 MPS-AmoldA V2 698.93 700,00 212.02 13.83 198.19 Pass: Major Risk I M Pt S Pad Working MPS-Amold Plan#2 MPS-ArnoldAL 1 V 698.93 700.00 212.02 13.83 198.19 Pass: Major Risk M Pt S Pad Working MPS-111 Plan MPS-III V1 Plan: 549,54 550.00 46.79 11.48 35.31 Pass: Major Risk M Pt S Pad Working MPS-Q3 Plan MPS-Q3 VO Plan: M 1300.74 1300.00 3.00 22.26 -19.25 FAIL: Major Risk M Pt S Pad Working MPS-Q5 Plan MPS-Q5 V1 Plan: M 400,01 400.00 210.12 8,55 201.57 Pass: Major Risk M Pt S Pad Working Plan MPS-01 Plan MPS-01 VO Plan: M 500,00 500,00 213.60 10.58 203,02 Pass: Major Risk M Pt S Pad Working Plan MPS-02 Plan MPS-02 V2 Plan: M 599,84 600.00 195.68 12.03 183,65 Pass: Major Risk M Pt S Pad Working Plan MPS-03 Plan MPS-03 V2 Plan: M 400,00 400,00 180,65 8.74 171.91 Pass: Major Risk M Pt S Pad Working Plan MPS-Q4 Plan MPS-04 V1 Plan: M 450,03 450.00 166.25 9,00 157,25 Pass: Major Risk M Pt S Pad Working Plan MPS-05 Plan MPS-05 VO Plan: M 599.76 600.00 150,78 12.37 138.41 Pass: Major Risk M Pt S Pad Working Plan MPS-06 Plan MPS-09 VO Plan: M 750,03 750.00 133.74 14.28 119.46 Pass: Major Risk M Pt S Pad Working Plan MPS-07 Plan MPS-07 VO Plan: M 399.99 400.00 120.55 8.77 111,78 Pass: Major Risk M Pt S Pad Working Plan MPS-08 Plan MPS-11 VO Plan: M 449.92 450.00 106.13 9,69 96,44 Pass: Major Risk M Pt S Pad Working Plan MPS-09 Plan MPS-06 Pilot V2 P 599.80 600.00 90.58 11,96 78.62 Pass: Major Risk M Pt S Pad Working Plan MPS-09 Plan MPS-06 VO Plan: M 599.80 600.00 90,58 11,96 78.62 Pass: Major Risk M Pt S Pad Working Plan MPS-10 Plan MPS-13 VO Plan: M 449.91 450.00 75.81 9,70 66,11 Pass: Major Risk M Pt S Pad Working Plan MPS-11 Plan MPS-06 VO Plan: M 500,01 500,00 61.14 9,80 51.34 Pass: Major Risk i M Pt S Pad Working Plan MPS-12 Plan MPS-12 VO Plan: M 599.70 600,00 46.11 12.39 33,72 Pass: Major Risk I M Pt S Pad Working Plan MPS-13 Plan MPS-10 VO Plan: M 849.56 850.00 31,01 14.75 16,26 Pass: Major Risk : M Pt S Pad Working Plan MPS-14 Plan MPS-14 VO Plan: M 549.84 550,00 16,03 11.50 4.54 Pass: Major Risk ! M Pt S Pad Working Plan MPS-16 Plan MPS-16 VO Plan: M 449,74 450.00 15,61 9.70 5.91 Pass: Major Risk i M Pt S Pad Working Plan MPS-17 Plan MPS-16 VO Plan: M 599.66 600.00 31.32 12.39 18.93 Pass: Major Risk : M Pt S Pad Working Plan MPS-18 Plan MPS-19 VO Plan: M 449,88 450,00 45,79 9.65 36,13 Pass: Major Risk I M Pt S Pad Working Plan MPS-19 Plan MPS-17 VO Plan: M 499.68 500.00 60,95 10,56 50,40 Pass: Major Risk I M Pt S Pad Working Plan MPS-20 Plan MPS-20 VO Plan: M 599.64 600.00 75.87 12.35 63.52 Pass: Major Risk I M Pt S Pad Working Plan MPS-21 Plan MPS-21 V6 Plan: M 499,67 500,00 91.06 10,55 80,51 Pass: Major Risk M Pt S Pad Working Plan MPS-22 Plan MPS-24 VO Plan: M 699,40 700,00 105.70 12.63 93,08 Pass: Major Risk : M Pt S Pad Working Plan MPS-23 Plan MPS-22 VO Plan: M 599.63 600.00 120.82 12,33 108.49 Pass: Major Risk ¡ M Pt S Pad Working Plan MPS-24 Plan MPS-28 VO Plan: M 449.96 450,00 136.09 8,99 127.10 Pass: Major Risk M Pt S Pad Working Plan MPS-25 Plan MPS-23 VO Plan: M 449,86 450,00 151.34 9.58 141.75 Pass: Major Risk I M Pt S Pad Working Plan MPS-26 Plan MPS-27 VO Plan: M 399.95 400.00 165.64 8,66 156.99 Pass: Major Risk M Pt S Pad Working Plan MPS-27 Plan MPS-25 VO Plan: M 599.60 600,00 180,84 12.18 168.66 Pass: Major Risk M Pt S Pad Working Plan MPS-28 Plan MPS-29 VO Plan: M 599.60 600,00 195.92 12,26 183,67 Pass: Major Risk M Pt S Pad Working Plan MPS-29 Plan MPS-26 VO Plan: M 650.03 650.00 213.60 13.06 200,54 Pass: Major Risk M Pt S Pad Working Plan MPS-30 Plan MPS-31 V1 Plan: M 549.28 550.00 224,59 11,42 213.17 Pass' Major Risk M Pt S Pad Working Plan MPS-31 Plan MPS-30 V2 Plan: M 599.63 600,00 240,97 11,99 228,99 Pass: Major Risk M Pt S Pad Working Plan MPS-32 Plan MPS-32 VO Plan: M 449.93 450.00 256.25 9,00 247,25 Pass: Major Risk M Pt S Pad Working Plan MPS-33 Plan MPS-33 VO Plan: P 599.58 600.00 270.99 12.20 258.80 Pass: Major Risk - -----------.-------- - - - - ------- -- ----. --- .----- PS-15i pcrmit Subject: MPS-15i permit Date: Wed, 26 Dee 2001 12:19:53 -0600 From: "CampbelL Steve K" <CampbeIS@BP.eonl> To: "\vinton- aubert@admin.state.ak.us'" <winton - aubert@admin.state.ak.us> As per Tom Maunders request for clarifications to the permit on MPS-15i: './1 "Cement yields: r'> 'b ~-3A:" surface casing: lead = 4.15 cuft/sx & tail = 1.15 cuft/sx 7" production casing: tail = 1.15 cuft/sx Top of cement for the 7" production casing is planned at 3757' MD Lt' . 'SIr" The 1.9-~" shoe test will be (FIT to 10.0 ppg EMW) At the end of the well the bullheading diesel down to ~~ote: Cutting samples will is the first well on a new 10-3/4" x 7" annulus will be freeze protected by the shoe of the 10-3/4" casing. also be caught as per AOGCC regulations as this pad. If you need any further information please call me today. Thanks for your help & have a great day! Steve Campbell 907-564-4401(0) 907-564-4441(f) campbels@bp.com 1 of I 12/26/01 9A::! Af\,1 MPU S-15i Shallow Aquifer Protection b)' Proposed Surface Casing (Notes to File) BP proposes to drill the MPU S-l 5i water injection well in the south\vest comer of the Milne Point Unit. Ihis well \vill be the first \vell drilled from the Milne Point Unit S- Pad. Ihe concern is that proposed surface casing will protect all kno\vn USDW's. AEO 2 provides exemption for shallo\\1' aquifers at Milne Point within various sections in TI3N~ R 9,10,11 E, but the proposed S-15i well lies in S. 12, TI2N, R IOE~ \vhich is about 1.5 miles south of AEO 2 exempted area. Io check if the proposed surface casing will protect all kno\vn USDW~s, well records and AEO 2 tiles \vere examined for \vater samples, and IDS calculations were performed using \velllogs. Water Sample Data MPU CPF-I water source \vell (located 3 miles NNE of S-15i) was open from 2905 - 331 O~ MD (2608 - 3088' TVD) in 1986~ and IDS values for water san1ples taken on Jan. 3.1986 and Jan. 6,1986 were measured at 3162 ppm and 2500 ppm, respectively. Conoco's Production Research Division (PRD) measured "salt" concentration in samples from CPF-l at 3260 ppm. AEO documents indicate that four \vater samples from the MPU B-Ol \\1'ell (located 4.5 miles NNE ofS-15i) ranged from 3160 to 3539 ppm IDS. TDS Calculations from Well Logs Well logs from the Texaco Prudhoe #1 and MPU H-Ol \vells were used to quickly calculate IDS content of well-developed shallow sands beneath the pern1afrost using resistivity and porosity data. The SP technique was not used as the SP data are notoriously erratic at Milne Point. Texaco Prudhoe #1 Top MD Base MD Approx. TVD TDS Comments 2600 2629 2615 3532 Density-Neutron curves separated 2837 2853 2845 3239 Density-Neutron curves separated MPU H-Ol Top MD 2598 2623 2627 Base MD Approx. TVD TDS Comments 2623 2341 3254 Density-Neutron curves separated 2627 Thin shale bet\veen sand lobes 2650 2369 1570 Den-Neutron curves crossover MPU H-Ol Density- Neutron Log I I I I I I I - . I H8. ~~- f ¡ ~~~~~,~ rtl,1 I ~ ~ .. . .. - Gas indicated by I ---'? ,...==-"" cross-over of curves l ~~-~.'~~ -\--e700~~~~=~~~ . J L.. j )! I r L::.-" -- ' ~ j ' ..1'$ ,1. I Ii < Il ". ~ Log analysis is complicated in this portion of the Milne Point Unit by shallo\v gas, \vhich causes calculated salinity values to be unrealistically low by overestimating the porosity of the sand. An excellent example is found in the MPU H-Ol \vell. TDS calculations were performed in a sand consisting oft\vo lobes that are separated by a 4-foot thick shale. The lower sand lobe clearly sho\vs cross-over of the density and neutron porosity curves, indicating that gas is present in the sand. TDS calculations for this sand lobe yield a value of 1570 ppm using the density porosity and resistivity data (porosity derived from density curve alone matched provided the closest match to the laboratory water analysis results ). The overlying sand lobe, \vhich is separated by a 4-foot thick shale layer, sho\v density and neutron curves that are widely separated, indicating a lack of gas \vithin the sand. TDS calculations for this upper sand lobe yield a value of 3026 ppm using the density porosity and resistivity. The TDS calculations for the upper sand lobe agree very \veIl \vith the 3160 to 3539 ppm value range derived from 5 of the 6 \vater samples taken fron1 the MPU CPF-l and B-1 \veIls, and \vith the 3260 ppm concentration measured in CPF-l by Conoco' s PRD group. Summary Surface casing in proposed S-15i \\iill be set at 2548' MD (2482' TVD). Water sample data and log calculations indicate the salinity of the sands at this depth and below \vill be greater than 3000 ppm. Surface casing set at the proposed depth in MPU S-15i will protect potential sources of drinking \vater having salinity less than 3000 ppm. Steve Davies December 20, 2001 1900860 SFD picked data Run Parameters: KB Surface B/Permafrost Run Bot Shallow T Max Temp Temp Grad Rmf Rmf Temp RESISTIVITY METHOD Top Depth Base Depth RES/DEN 2598 2627 RES/DEN-NEU 2598 2627 1 72ft Oft 1872 ft 5242 ft 32 F 104 F 0021365 1 35 60 F a= Ave Depth - TVD 2623 2650 2611 2341 2639 2369 2623 2650 2611 2341 2639 2369 MPU H-1 Salinity Calculations 0.62 m= 2.15 Estimated Thick GR Rt PhiD PhiN Dtave PhiS Phi Temp Fm F Rw Rw75 TDS Comments 2269 25 14 0.37 ? #VALUE! 0.3550 478 5.7465 2.4363 1.6252 3254 Den-Neu widely separated 2297 23 22 0.395 ? #VALUE! 0.3950 484 4 5678 4.8163 3.2482 1570 Den-Neu Cross-over 2269 25 2297 23 14 037 0.4250 22 0.395 0.4000 #VALUE! #VALUE' 47.8 4.5063 3.1068 2.0725 48.4 4.5063 4.8821 3.2925 2518 Den-Neu widely separated 1548 Den-Neu Cross-over ? ? 0.3975 0.3975 1821210 SFD picked data Run Parameters: KB Surface B/Perrnafrost Run Bot Shallow T Max Temp Temp Grad Rmf Rmf Temp RESISTIVITY METHOD Top Depth Base Depth RES/DEN 2600 2837 RES/DEN-NEU 2600 2837 1 75 ft Oft 1875 ft 7506 ft 32 F 147 F 00204227 1,35 60 F a= Ave. Depth - TVD 2629 2853 2615 2615 2845 2845 2629 2853 2615 2615 2845 2845 Texaco Prudhoe #1 Salinity Calculations 0,62 m= 2.15 Thick GR Rt Phi 0 PhiN Dt ave Phi S Phi Temp Fm F Rw Rw75 TDS Comments 2540 29 12 0.37 ? #VALUE! 0.3700 47.1 5.2572 2.2826 1.5038 3532 Den-Neu separated 2770 16 11 0.385 ? #VALUE! 0.3850 51.8 4,8267 2.2790 1 ,6327 3239 2540 29 2770 16 12 0.37 0.4100 11 0.385 0.4400 ? ? #VALUE! #VALUE! 0.3900 0.4125 47,1 4,6946 2,5561 1,6840 3134 Den-Neu separated 51,8 4.1613 2,6434 1,8937 2770 H 202450 DATE 12/07/01 CHECK NO. ()Q202450 DATE INVOICE I CREDIT MEMO DESCRIPTION GROSS VENDOR DISCOUNT ALASKAOILA NET 00 120501 CK120501 PYMT COMMENTS: HANDLING INST: 100.00 100.00 Pernit to Drill 7ee 5/H - Terrie HubJle X4628 1Y12~/V€ D( D (1 .., ~I (\ "f"' lðSka Oil /.' /; ,: & Gas ,... 4 vOr¡~. f1chcr~_' (,Ofr1"JJC:n u,Vf.J "Uò)JrJf. -íYl-PS - l S I' IE ATTACHED CHECK 15 IN PAYMENT FOR ITEMS DESCRIBED ABOVE, 'TOTAL,~ 100.00 100.00 BP EXPLORATION, (ALASKA) INC. P.O. BOX 196612 ANCHORAGE, ALASV.A 99519.6612 FIRST NATIONAL BANK OF ASHLAND AN AFFIUATE OF NATlmlAL CITY BANK CLEVELAND. OHIO I No. H2O 2 4 5 0 ' CONSOLIDATED COMMERCIAL ACCOUNT 56-389 --¡:j2 00202450 PAY ONE HUNDRED & 00/100************************************* US DOLLAR DATE 12/07/01 AMOUNT $100.00 To The ORDER Of ALASKA OIL AND GAS CONSERVATION COMMISSION 333 WEST 7TH AVENUE SUITE 100 ANCHORAGE NOT VALID AFTER 120 DAYS AK 99501 "J~ ßf~t,~,_~ /II 2 0 2 L. 5 0 III I: 0 L. ~ 2 0 :18 g 5 I: 0 0 8 ...... ¡. g III TRANSJ\1JT AL LETTER CHECK LIST CIRCLE APPROPRIATE LETTERlPARAGRAPHS TO BE INCLUDED IN TRANSM1TTAL LETTER WELL NAME /fl ¡/¡J 5~ is L' CHECK 1 ST ANDARD LETTER DEVELOPMENT CHECK \VllAT APPLIES ADD-ONS (OPT]ONS) MULT] LATERAL (If api number last two (2) digits are between 60-69) DEVELOPMENT REDRILL PILOT HOLE (PH) EXPLORA TI0N ANNULAR DioSAL 1PNO INJ~7"ELL ANNULAR D]SPOSAL <--.) YES INJECTION WELL REDRILL ANNULAR DISPOSAL TH]S WELL "CLUE" The permit is for a Dew well bore segment of existing well ~ Permit No, AP] No. Production should continue to be reported as a function of the original AP] number stated above. ]n accordance with 20 AAC 2S.00S(f), all records, data and logs acquired for the pilot hole must be clearly differentiated in both name (name on permit plus PH) and AP] number (50 -70/80) from records, data and logs acquired for well (name on permit). Annular disposal has not been requested. . . Annular Disposal of drilling wastes will not be approved. . . Annular Disposal of drilling wastes will not be approved. . . DISPOSAL INTO OTHER Please note that an disposal of fluids generated. . . ANNULUS L-J YES + SPACING EXCEPTION Enclosed is the approved application for permit to drill the above referenced well. The permit is approved subject to full compliance with 20 AAC 25.055. Approval to perforate and produce is contingent upon issuance of a conservation order approving a spacing exception. (Company Name) will assume the liability of any protest to the spacing exception that may occur. ~''? .. ' ",-1,/.' ", /,,1 /1 d . ~~)f k-ell~l/ IJ/;//!{ ~-,;:d ~7 /11¿J;fj/ . ~{W1-<¿é'(.i.--¿ .\ r~~</I "::;Ù/' '4 X ~ /-,({;çh'-.- J / ¿, ' , "{. " / L' , -, .-, Templates are located m drh'eljodyltemplates ~ C Û....)¿.U:¡hC'/1 -- ¡{~ "'7'[-'~' "1,1:'-71'- -,-b¿-¡;.'7~~ &'-?7ðL~- -Þ T ð. ~M I) I~¡':~l ( WELL PERMIT CHECKLIST - COMPANY ß f~' X WELL NAME ,;S -/~/.' PROGRAM: exp - dev. ~ redrll - serv /' well bore seg _ann. disposal para req - FIELD & POOL ,5.?sJ'-iú INIT CLASS ~ V í It.-},'^^:J '* GEOL AREA 5?7¿>' UNIT# () / I~ 32){" ON/OFF SHORE 0/) ADMINISTRATION 1. Permit fee attached. . . . . . . . . . . . . . . . . . . . . . .~) N 2. Lease number appropriate..-?¥. ~~,"¥; <'~rr~.¡'~, ¡G? ~ 7(c.: '. vrN: /:¡'~70';>~ UJ~( /¡¿~ ¿'~'I--rre...j w'i-/¿~-"~ /7Þ¿ ..3<ff¿;/C5T.. 3. Unique well name and number. .. . . . . . . . . . . . . . .. ~Ñ J. .. 4. Welllocatedinadefinedpool.................. '1'-l!D ~-p~ /~è~ ~t/Ä~/..¿.,~' ..5.cÄ~,. &~l-f~C),.,//;:;'/ ¿?..; ~~ý'0/r.<4'~ 5. Well located proper distance from drilling unit boundary. .. . '"' N ~ () () ;¿.s:5 ~i~~'7c4. ..5ç:p" - ~¡:"" ~ ¿' 6. Well located proper distance from other wells.. . . . . . . . . . " NO' - . " ~ ~ V "--c. '-"'J (Iv /c => . ' 7. Sufficient acreage available in drilling unit.. . . . . . . . . . . V N 8. If deviated, is wellbóre plat induded.. . . . . . . . . . . . . . N ¡:.-; ,:...:;;/ /4 9. Operator only affected party.. . . . . . . . . . . . . . . . . . N . 10. Operator has appropriate bond in force. . . . . . . . . . . . . N ~t1.-.f?k:J I art.....) 11. Permit can be issued without conservation order. . . . . . . . N I,' APf~ DATE 12. Permit can be issued without administrative approval.. . . . . .; N cP-7,d~Þ . /iL :) '2' /7' C I 13. Can permit be approved before 15-day wait.. . . . . . . . . . ) N ENGINEERING 14. Conductor string provided. . . . . . . . . . . . . . . . . . . ~ // (' r. '/.. " ~ Î /' . 15. Surface casing protects all known USDWs. . . . . . . . .; .I'J.-,,~.::::>~,~-(r .~) diylt!- /"~ z?~f5 rHÞ<.....-zt.lf!2.. 7V'''l...¡r-.-.- .5':'<"(-1"4-<'<- L'b"1 16. CMT vol adequate to circulate on conductor & surf csg. . . . . . N ~ ,/J'?/"'t.L ~ ~/:>¿. ;l{ñ.4~7ð/5 ~~-/I ~ h.:1?1'L </'1/<;)/(. ",ý'-( ~/ IL\L4..tCò 17. CMT vol adequate to tie-in long string to surf csg. . . . . . . . .I N {~~,-Vd!:b'¿- #"' / vt-<-d/~P~ .:si:L/,.;,,..4., % ,e:æ¿fI ~ ~..¡ -It...,S. d'7'.:¥/: ,...:1k,.;.ld 18. CMT will cover all known productive horizons. . . . . . . . . . N ~ ~rx-" 3.200 ~qof.l¿J,nl,.. ....,/l}¡-¿L e!.r:::/ lU-lk". ðUI~<.?t..:.:; z:.~ 19. Casing designs adequate for C. T. 8 & permafrost. . . . . .. - . N ~~ -- .3k'l..ì ,. .~,? /)(.Z':/ s.. '.H:-c:I - a.-"ku'¡- -=>3:-Dv'~:!ft TP'~' -?.If?,; é ð-? ~.c:i~' /) , 20. Adequate tankage or reserve pit.. . . . . . . . . . . . . . ...... II ~ N ~,A~t..-4 .>'1v:4'~.,.c.d '31{çD' :3S 3q 7]:» .' H~~U..l:.f.t:..v (Ey.,.:.~¿~ tJ~r-: (:~ 21. If a re-drill, has a 10-403 for abandonment been approved. . . JJIA. Y N #-"2-" IHt.t.?1 þ.¿vÆ_~'L~H.C'e.d :0 t.-}u2,4..dë þ- ¡::/'i..C/tt:Lr.jj~L. :..$.2-..2- /'Íß 22. Adequate well bore separation proposed.. . . . . . . . . . . . N /ló I-L S -4:, h k .J:Z-.r-. 3-dd. ..fw-Ÿl.~...t ex IS c. ,-,.$> (ð?--t. . t 7 . -. /'). 0'. _c/~ 23. If diverter required. does it meet regulations. . . . . . . . . . .I N S/'¿v!- ~4Y~¿¿l( ¿.. .,::~..sc i..1~- .1~d ~ mUc/¡? Stt'- "" /" :.e. ';1~;6 . . 24. Drilling fluid program schematic & equip list adequate. . . . . N ..fp Ac6 o:q:.z ~~ .::Sc.t'~VÃd.vl ~/I. ff /pe/ (e.....(e~ .. ~'~/~'¿':~ -'Z''--' ??r.,,?' 25. 80PEs, do they meet regulation. . . . . . . . . . . . . . . . N /!..t->l¿.5 ~ ,¿ -;./ /;;t .,4,'5 51."1 R~~<-t fl..../ 12.~/2->. .42) 7 26. BOPE press rating appropriate; test to 2.50(' psig. N 27. Choke manifold complies w/API RP-53 (May 84). . . . . . . . N 28. Work will occur without operation shutdown. . . . . . . . . . . ~ 29. Is presence of H28 gas probable.. . . . . . . . . . . . . . . . Qf 30. Permit can be issued w/o hydrogen sulfide measures. . . . . &) N 31. Data presented on potential overpressure zones. . . . . . . a;N 32. Seismic analysis of shallow gas zones. . . . . . . . . . . . . - - ~ AP~R DATE 33. Seabed condition survey (If off-shore). . . . . . . . . . . .. ~ \VV N /6'/) I 2.'. I~, ¿~ I 34. Contact name/phone for weekly progress reports [explorat~nIYJ Y N ANNULAR DISPOSAL35. With proper cementing records, this plan . (A) will contain waste in a suitable receiving zone; . . . . . . . (8) will not contaminate freshwater; or cause drilling waste. " to surface; (C) will not impair mechanical integrity of the well used for disposal; Y N (0) will not damage producing formation or impair recovery from a Y N pool; and (E) will not circumvent 20 MC 25.252 or 20 MC 25.412. Y N GEOLOGY: ENGINEERING: UIC/Annular COMMISSION: Rþ&1fl'( .W wGA iqr.v WM 8~' (1 s ¿~ ' TËM.k)!?\'Vll~I~ \ JM~ J~~ril ( 4Pf~^ DATE {t]'.-!" l Cd-I'¡t- \ w6A Il../ Lc:" GEOLOGY APPR DATE Y N Y N c:\msoffice\wordian\diana\check.list (rev. 11/01/100) ~~1' ¡t(iU/ -!2d (¿;//'~'-~Y /lttLLi;~A I /',// '/.' / ." p' rU/I ~(.,'I"¡-<-- t' /1'::; ~'u.j4/ M7V ¡/d I~~ ~1í þ>< a~k~4J ~,~ ¿':5~!,hc"-<I- co.>a--.--¡Çk ~ if¿ ~I !~~$ c¡Þ'~1-- ;# .h:¿: , ¡1 /'Ý~.;t'l~ (fJ'~:;'~''fZ¿/.J(IV'\ ~~ q-r;.-:L¿;.¿~\-I- -~~',. " /V'/)/, // :.; ,J ~¿¡,,-wlk..:5 """l'l:/ .,¿,,4\.L.:.-l.:--¡(k."<X: ~ ll.iJ 5e.¡J (2, L 'If v; k.v:L-¡ú!-1u-fi1(o,,-¡ '- ðY d...è--r" / _tL~ 7I1Ld~y/' l.-:t/-~-oC-:)¿L( ,:o-j /( 11¿.,j- L a-'/Ä: ~ ~ /J'?' î'( .-' / V f..~~'J\r..0\5~\ ~ ~\:::~, ~(¿d::- L"~;C~ .¡.~ Comm,nts/lnstructior)!i: I ¥ ¿uJ~ ~,.j-.,I ~~~ c.-H,/ ,4/0 '5 ùi:~-,j,-/ /'../ ,,~k$ -/3 ¿., fd~~ /ðdJ /£./J be.. ~J-4~j /k A,we. /7 ~ t. . &:5' IV?! ;;~ ~~ J;:..?qe/" /' ¿' /¿, ¡¡:- /' ~ o/~,-' Ú ,t It_) /f/~ c 0 Z O( ~ :E :xl ~ m z ~ .J: en > :xl m{ > Well History File APPENDIX Information of detailed nature that is not particularly gennane to the Well Permitting Process but is part of the history file. To improve the readability of the Well History file and to simplify finding information. information of this nature is accumulated at the end of the file under APPENDIX. No special effort has been made to chronologically organize this category of information. dOJ-dtf5 IO{¡;70 Sperr~'-Sun Drilling Ser,-ices LIS Scan Dt i 1 i t~' $Fe":ision: 3 $ LiELib $P.e'.'ision: -l $ Thu Mar 21 12:3-1:32 2002 Peel Header Sec'ice name............. LISTPE Da. t e. . . . . . . . . . . . . . . . . . . . . 02 0 3 2 1 Origin. . . . . . . . . . . . . . . . . . . STS Peel lJame..... . . . . . . . . . . . Ul1ElJú\¡JH Cone inu.a t ion lJumber. . . . . .01 pre'.'ious Reel lJame...... . UIWllOtrJ1.} COITrnents................ .STS LIS Writing Library. Scientific Technical Ser,:ices Tape Header Ser:ice name............. LISTPE Da e e. . . . . . . . . . . . . . . . . . . . . 02 I) 3 2 1 Dr iç:¡ in. . . . . . . . . . . . . . . . . . . STS Tape Uame. . . . . . . . . . . . . . . . U1I¥.lJO\'oITT ContinuaClon lJumber..... .01 Pre" ious Tape Uame. . . . . . . ill,WlJOII'JU Comments................ .STS LIS Nr it ing Librar:/. Scientific Technical Ser~ices Pl'l~'S ica 1 EûF Comment Pecord T.;é..PE HL;é..DEP. uilne Point I.TI'JD r-L:'.D LOGS # \,:'IELL i J.:'J.IE: ;'.P I LJUllBER: OPEP';'.TOP. : L()GGI¡IG COHP.:'.lT"I: T.:'.PE CP.EXTIOlT 0.:"'1'£: # JOE D.:'.T,:'. ¡.!PS-15 :,00292306100 SP Exploration (Alaska) I Inc. Sperr:z'- Sun Or ill ing Ser:i ces 2 1 -l.t:'.R - 0 2 JOB Uill lEEE : LOGGIlTG EnGInEER: OPEP';'.TOF l'JITlTESS: I !VJD EUl T 1 .::X.-I.!L.! - 2 2 0 15 P. Sl.ll TH C. OL:OlJ l n,'.JD Em ¡ 2 .:'X-UlI- 2 2 0 15 J. PITCHER C. DI:.,:OIJ # SUP.F ;'.CE LOC.;é..TIOlJ SECTIOlr: TOhTllSHIP: EA.lIGE: FIJL: FSL: FEL: F\'IlL: ELE'.'.;ë..TIC)! \ FT FPOl.l Y.ELL'l' BUSHIlJG: DEPEICE FLOOP.: GP.':)VUD LE'..'EL: 12 12lJ 10E 3323 136 [.ISL 0 , ""73.20 38.80 # \\lELL C,:'.S IlJG P.ECOP.D 1 ST STP.IlJG 2I'JD STEIlIG OP£II HOLE C;'.S lUG DE I LLEPS BIT SIZE (III) SIZE (III) DEPTH (, FT) 12.250 20.000 113.0 3.500 9.625 2~99.0 .3RD STRIiJG PRODUCTIO¡ j STF.IlJG "# P.El-L~Rl:S : 1. ,~LL DEPTHS .;RE [.[E,;SURED DEPTHS ([.ID) CmLESS UTHEP[I\lISE [jCìTED. 2. .;LL '.'ERTIC;'.L DEPTHS .:'.P.E TEUE '.~EETIC.~.L DEPTH (TI,.7D . 3 . I.ß'JD EUnS 1 [.: 2 t!JEP.E DIPECTIOIJ.:'.L IrnTH I'P.TURr..L G.:'J,II.L; PPOBE (iJGP UTILIZILTG SCIlTTILL.:;'TIOIT DETECTORS. <-:l . LOG .:..lID DIGIT.::'.L D.:;'T.~. OlTL'l- \,'JEP.E SHI fTED TO .:.. SCHLUHBEP.GEP. C.::'.SED- HOLE G':'J.II.E p~r.:.L LOG P.U1I 11,1 UPS-15 OIT 2"7' J.::'JTU':'.P.J.- 2002. LO(3 HE.r.,DEP D,:...r,:.. PET.:;'IlT ()FIGIIL~.L DEPTH R.EFEPEI-IC ES . 5 . UWD PTJlTS 1 &. 2 REPEESEIIT WELL llPS -15 WITH API#:50-029-23061-00. THIS [¡1JELL RE,;CHED .:.. T()T':'.L DEPTH ('I'D) Of o.! '794' 110 -4582' T':'D. SF.OP = S[,IOOTHED P~:'.TE OF PEllETP_~.TIOIT t!,jHILE DEILLIlIG. SGED = S["IOOTHED lJATUP_:'.L G.r.J"IIL~. p_:.:; COI-IBIHED. $ File Header Ser.:ice name............ .STSLIE.OOl Ser..ice Sub Le'.-eI Uame... ','ersion Uurnber. . . . . . . . . . .1.0.0 Date of Generation...... .02 03 21 l-Iaxirnum Ph~'sical P.ecord.. 65535 File T~ 'Pe. . . . . . . . . . . . . . . . LO Pre"ions File IJame...... .STSLIB.OOO Comment P.ecord FILE HE.~.DER FILE IEJUEEP.: EDITED ¡,IER.GED [T~\ID Depth shifced and DEPTH IlJCREUEUT: # F I L E S Ul.II.E-I.P.l. PBD TOOL CODE GR POP $ 1 clipped cUr',,"es; all bit ru.ns merged. .5000 ST.~.RT DEPTH 76.5 139.0 STOP DEPTH .:J:73-l.0 .:J:i'9-l.0 tt B.:'.SELIUE CiJR\'E rOp. SHI rTS : CURVE SHIFT DATA (MEASUPED DEPTH) - - - - - - - - - EQUI\".;LEtJT UlJSHIFTED DEPTH - - - - - - - -- B;'.SEL IITE ";'6.5 167.0 188.5 211.0 218,5 228.0 2..19.0 299.0 30..1.5 311.5 328.0 DEPTH GR 76.5 167.0 188.5 211.5 219.0 22""7.0 250.0 297.5 302.5 309.5 325.5 336.0 33<4..0 3.J7.5 345.0 351.0 350.5 387.0 385.5 ..J08.0 40:.5 ..J.l 5 . 5 .J1.J.5 .J30,5 ..129.5 ...1:36.0 .,135.5 ..J58.0 .J.57.0 ..J61.5 .,161.5 ..J6.J.0 -!63.0 ..J,";,4.5 .,17.,1.0 490.5 .:190.5 ..J97.5 -!97.5 523.5 523.0 533.5 534.0 :,.,10.0 539.5 5.J-!.O 5.J.:l.0 5:,0.5 550.5 556.5 556.0 5"70.5 5:0.5 5 -;' 8.0 5"78.0 585.5 585.0 633.0 631.5 659.0 653.0 678.0 67 ï' .0 693.5 691.5 -:'08.5 707.5 720.5 719.0 -:'33.0 731.0 -:'.:12.5 7.:11.0 -, 5 3 . 5 751.5 ~-::'1 I: "761.0 ' t. L . ..) ~66.0 763.5 781.0 779.5 "794.0 792.0 813.5 811.0 8~O.5 816.5 826.5 823.0 836.0 833.0 843.5 841.0 846.5 8.:.13.5 8:,";"' . 5 855.0 863.5 861.0 :::"73.5 81'0.5 e90.1) 887.5 E99.5 896.5 925.5 923.0 951.5 9.J.9.0 9ï2.0 970.5 9E:1.0 979.0 1002.0 999.5 1005.5 1003.0 1(11.:.1.5 1012.5 1(1:,7.0 1055.5 1062.0 1059.5 108--1.0 108:::.5 1091.5 1089.0 1094,(1 1092,0 1111.0 1108.5 11~,ï'. 5 1135.0 1143.5 11--11.0 1160.0 1157.5 11"7--1,5 1172.5 1216.5 1213.0 1~52.0 1249.0 1259.0 1255.5 1282.5 12"78.0 1293.0 1288.0 1396.0 1392.5 10.169.5 1.J68.0 1499.5 1.J98.0 1:,0..1.5 1503.0 1531.0 1529.0 1533.0 1531.0 1:,.,10.5 1538.5 1578.0 15-:--::.0 1598.5 1597.5 1615.0 1614.5 1640.0 1639.0 16;'3.0 1671.0 1729.0 1726.0 1764.0 1761.0 1/';'1.5 1"769.0 1"789.0 1"785.5 1843.5 18.J0.0 1860.5 1856.0 18"71.5 186:'.0 1903.0 1898.5 19..,15.0 1942.0 19"79.0 1976.0 2021 . 0 2018.5 203..1.0 2029.0 20.J.J.O 2040.0 2056.0 2055.0 2095.0 2092.0 212--1.0 2121.5 2131.5 2127.5 2150.0 2148.5 2159.5 2157.0 220-4.5 2201.0 2220.5 2216.5 2260.0 2255.5 22-:-'8.5 2273.0 2314.5 2310.5 2349.0 23--18.0 2384.5 2383.0 2402.5 2399.5 2.:169.5 2.J6.J.5 2520.0 2516.0 25..14.5 2541.0 2547.0 25.c!3.5 2556.5 2553.0 2:,66,0 2561.0 2~,95.5 2591.5 2600.0 2595.5 2619.0 2615.5 2625.0 2620.5 2635.0 2630.0 26.J.J.0 2639.5 2660.0 2657.0 2698.0 2696.5 2-:'15.5 2-:-' 11.5 2--:' 2 ú. 5 2716.5 2-23.0 2-:'18.:, 2-:-65.0 2762.0 2-:-'72. (I 2ï66.5 2777.5 2773.0 2827.0 2823.0 2c:40.5 2836.0 2355.5 2868.5 2909.5 2933.0 2969.0 297~.O 3021.0 302--1.5 3037.5 3090.0 3093.5 3099.5 3113.0 3125.0 3167.5 3181.5 3188.5 3195.0 3218.0 3221.5 3225.0 3236.0 32--!2.0 3256.0 3262.0 3265.0 32"70.5 321'8.5 328.:1.0 3293.5 3318.0 3328.5 3335.0 33.49.0 3352.5 3360.5 33-;''-1.0 3381.0 3384.0 3387.0 3398.5 3.,109.0 3.,122.5 3.,129.0 3.,151.0 3.,1"71.5 3.,187.5 3-:195.5 3522.5 35~6.5 3535.0 35..,15.0 3552.0 3589.5 3625.5 3649.5 3661.5 36"70.0 3709.5 3718.0 3721.0 ]725.5 3732.0 3760.5 3766.5 2852.0 286--1.0 2905.0 2929.5 2966.0 2968.5 3017.5 3020.5 3033.0 3086.0 3090.0 3095.5 3108.5 3119.0 3163.0 3176.5 3186.5 3191.0 321--1.5 321"7.0 3221.0 3232.5 3238.5 3253.0 3258.5 3262.5 3267.5 32í5.5 3280.0 3290.5 3315.0 3325.5 3331.5 3345.5 3350.5 335,8.0 3370.0 3378.0 3383.0 3385.0 3396.5 3--107.5 3""¡21.0 3427.5 3--1--18.0 3..169.0 3..,185.0 3--193.0 3518.5 3523.0 3531.5 35--11.0 3548.5 3585.5 3621.5 3646.5 3658.0 3668.0 3706.5 371..,1.5 3-;'18.5 31'22.5 3729.5 3756.5 376--1.0 S'6C:Sr O'TTSt O"SOSt S.9Stt O'C:.tt 0'9Stt O'6ttt O.6£:tt S.9£:pt O'6Gtt S'STt't 0'S6Et S'r~tt S'':'Stt O.tSEt S'ctEt S'9é:tt O'S2:tt S"LT£t S'TTt:t S'96ct S'£8GP O'ESer S.TtGt O'Occt S'9TGP S'TTct O'TOct 0.t6Tt 0'68Tt O'G~Tf." O'99Tf' S'SSTt O'C:tTt O'£TTt S'60Tt S'OOTt S'r60t O'~80t 0'T80t 0'8S0t O.~tOt S'c.t:Ot S.TcOt O"f'TOt 0'900t 0'~S6£ O.t86t S'C:86£ O'896£: S'396E S'9SG!:: S'St6t: S'Of'6£ S'Tt:6t: S'806£: S'006£: S'C88t: O'9i.8t: S'ES8E O.t:t8£: 0.0<:8£: O.66LE S'08L£: 0.89':'£ S'tESt S'9TSt S'OTSt' O'T6rt S.~¿,tt S'T9tt O'£:Stt C;'(f'tt S.Ottt S. U:tt O'Oc:tt O.66t:t 0.6~tt S'T9',::1' S.~S[t O'Lf':::1' O'Üttt S'8(;[r S'Të:[t S'SlU' O'OOtt O'98~P O'9Së:t S"SE~f7 '; . f' (; ,~ v O.6T::Þ S"STGv O'[OGP S'S61Þ O'T61Þ O.t~Tt> O'69Tt S'T91f.> O'S[Tf' S'9TT'r O'tTIp S.t:OTv S'':'60f; S'680f> S.t80t O'T90f¡ S"OSOfï S . S -¿() t- O.t-COf7 O'~Ti)fï S'600fï S'066£ S'':'86£: 0'986£: S'1L6£: S.t'96£: O"096[ S' ~r()t: O' t:t'6E S'(t6E O'TT6£: S'(:06£: S.t88E 0'6L8£ S'9S8E O"StSE S'Ic8£: S'c08E S.t8.:.£: O'I':'L£ 4563.0 45,'6.5 4611.0 4626.5 4648.0 ~668.0 46ì4.5 4676.5 4686.0 4696.0 4:02.5 4;94.0 $ -1558.0 .J5"71.5 .1605.5 ..,1622.0 .J6':1:2.0 .J663.0 .J669.0 .J671.5 .J6ì9.5 .J69.J.5 -1"705.5 -1-:-'97.0 # ¡.IEEGED PBU UÍlv D LIÍlvD S D.c...T.c... SOUP.C £ TOOL CODE BIT RUlI 1-10 UEP.GE TOP 1 ~6.5 2 2514.0 HEP.GE B.è...SE 251.1.0 -1~9ì.O # P.El-bEt:S : ilEP.GED iL::'.11I P.::"SS. $ # Data Format Specification Record Data Record TJ'pe. . . . . . . . . . . . . . . . . .0 Data Specification Block Type.....O Logging Direction.......... . .. . .. . Down Optical log depth units.......... .Feet Data Reference Poine............. .Undefined Frame Spacing.................... .60 .1111 [.Iax frames per record. . . . . . . . . . . . . Undefined .:'.bsent ':a1\le..................... .-999 Depth Uni ts. . . . . . . . . . . . . . . . . . . . . . . Datum Specification Block sub-e~1)e...0 [lame Ser.- ice Order Units Size Usam Pep Code Offset Charmel DEPT FT .J 1 68 0 1 F()P UWD FT H 4 1 68 .J 2 GP [.rvJD .:'.PI -1 1 68 8 3 First Lase ilame Ser:ice Unit Uin ¡.lax i.lean lTsam P.eadinçr P.eading DEPT fT 76.5 .Ji9.J 2<-135.25 9436 76.5 4"79..4 ROP I'TInJD FT H 0.5 2200.72 2.J3.6.J1 9311 139 4794 Gp. HWD .::'.P1 5.94 179.49 79.02-15 9316 76.5 -1"7'34 First Reading For Entire File......... .:6.5 Last £eading For Entire File. . . . . '.' . . ..J79.J File Trailer Ser':ice name. . . . . . . . . . . . . STSL1B. GO 1 Sec:ice Sub Le':el IJame... '/ersion iJumber. . . . . . . . . . .1.0. I) Date of Generation...... .02 03 21 ['Iaximum Physical Pecord. .65535 F i 1 e T:/];:)e, . , , , . . , . . . . . . . . LO IJext File I'Jame.........,.STSL1B.OO2 Ph~'s i ca 1 EC)F F i Ie Heac1er- Ser':ice name............ .STSLIB.OO2 Service Sub Le"el LJarne... '/ersion l'Tumber.......... .1.0.0 Dace of Generation...... .02 03 21 Uaximum Ph~'sical Record. .65535 File T:z.pe. . . . .. . . . . . . . . . . LO pre:ious File lJarne...... .STSLIB.OO1 Cornment P.ecord FILE HE.:'.DER FILE IIUlIBEP.: p~::'jnJ Ht'lD Cur:es and log- BIT RUn HUIIBEP.: DEPTH UJCP.Er-IElTT: # FILE SUUIL:'.P."; '.'ELIDOF. TC)(¡L C(,DE GR POP $ 2 header data for each bIt run in separate files. 1 .5000 ST';".P.T DEPTH ~'6. 5 139.0 STOP DEPTH 2-:1:52.0 251..],.0 # LC'G HU".DEP. D,:".T,:'. D;'.TE LOGGED: SOFTl^J.:"'RE SURF.;CE SC)FT\,^J.:'.P.E ',.YERSIOLT: DO(ÑHHOLE SOFTí^J.::'.PE \7£F.SIOlT: OAT.:'. TYPE (UEi.lOP\' OR. RE.~.L-TIUE) : 'I'D DRILLER (FT I : TOP LOG HTTEP.'.".::'.L (FT): BOTTOI.l LOG II iT EP.T.T;'.L (FT): BIT P.01'ATIIIG SPEED (PPI.I): HOLE INCLHr.:'.TIOlJ \ DEG iUUHIiJH KlJGLE: IL:''':': HJl1J..I ,:'JTGL E : # TOOL STRIi~ (TOP TO BOTTOM) VEIIDOR TOOL CODE TOOL T7PE iTGP n.r..TUPJ...L G.::'J.1i'L::'. PP.OBE $ # BOP.EH()LE .;.LID c.:'.SnTG 0.:'.'1'.:"- OPEiJ H()LE BIT SI::::E (lIT): DP.ILLEP.' S C.::"SII!G DEPTH (FT): # BOP.EHOLE COnDITIONS nUD T'r'PE: ¡.IUD DEIISIT; \LB G) : ¡.IUD 'll SCOS IT'; (S): HUD PH: MUD CHLORIDES (PPH): FLUID LOSS (C3): RESISTI\tIT"; (OHi'1i'l) ':'.1' TEHPER.;TUP.E (DEGF) l'1UD .:'.1' HE':'.SUP.ED TENPERATTJP.E (I-IT): HUD ,:'.1' I'L:''':': CIPCUL.;'TIrJG TEPHPEP~;:'.TUF.E: HUD FILTP"':'.1'E AT 1,11': ¡.IUD C,;F.E .;:',1' ¡.'IT: # UEUTP.O['J TOOL ¡.1;. l' P. I:': : 1.t;:'.1'R I:': DEIJS IT"; : HOLE C:o.:::'P.PECTIOll I. It! : It 2 3 - ,J ,:'J j - 0 2 Insite 0 Hemor~' 2519.0 113.0 2519.0 .j 30.9 TOOL I JLn.lB EP. 413 12.250 Spud I.Iud 9.30 100.0 7.5 900 18.4 .000 .000 .000 .000 .0 70.0 .0 .0 TO(IL ST.:'JTDûFF \ liT) : B\7E FREQUEl-TCY \ H:) : # P.El-U".PJ:S : ... .... 1* Data Format Specification Record Da ta Record T~1Je. . . . . . . . . . . . . . . . . . 0 Data Specification Block T~'pe.....O Logging DirectIon................ .Down Optical log depth units.......... .Feet Data Reference Point............. . Undefined Frame Spacing.................... .60 .1IB I'[a}~ frames per record............. Undef ined .:'.bsen t '.-a 1 ue. . . . . . . . . . . . . . . . . . . . . . - 9 9 9 Depth Uni ts . . . . . . . . . . . . . . . . . . . . . . . Datum Specification Block sub-t~'pe... 0 [Tame Ser "ice Order Onits Size lTsam Pep Code Offset Channel DEPT FT -1 1 68 I} 1 P.()P l' \rm (I 1 (I FT H -1 1 68 .J 2 Gp. HilmO 11) .:.. P I .J 1 68 8 j First Last [fame Ser:ice Unit Hin [.¡ax I.lean Usarn Reading P.eadino;¡ DEPT FT ì6.5 251.J 1295.25 -1876 76.5 251.,1, P.OP [.1WDO 1 0 FT'H 0.5 2200. ï'2 1"""'5.-l88 -1751 139 251.,1 GR HI'JDO 1 I) ;.. P I 22.-:'<-1 1¡9..J9 82.3191 ..J.752 "76.5 2--152 First Reading For Entire File......... .~6.5 Last Peading For Entire File.......... .251-l File Trailer Sep:ice name. . . . . . . . . . . . . STSLIB. 002 Ser:ice Sub LeHE: 1 IJame... 'Jersion lTumber.......... .1.0.0 Date of Generation...... .02 03 21 Uaximum Ph~/sical Pecord.. 65535 File Type..... .. ..... ... .LO [jext File [jarne...........STSLIB.003 PhJ's ical EOF File Header Ser~ice name............ .STSLIB.003 Service Sub Le':el lJame.. . ',:'ers ion Hurnbe r. . . . . . . . . . . 1 . 0 . 0 Date of Generation...... .02 03 21 I'IaxirnuITl Ph:r'sical P.ecord.. 65:,35 File T~ -pE:. . . . . . . . . . . . . . . . LO Pre:ious File Irame.......STSLIB.OO2 Cormnent P.ecord FILE HE.;DEP. FILE NUlIBEF.: R;..1v t.nrm Cur',:es and log BIT RU1J Iful.ŒER: DEPTH IIJCP.EHEITT: 3 header data for each bit run in separace files. 2 ,5000 #- FILE S UHIL:"'P. ï '...'ElJDOR. TOC)L Gp. p.op $ CODE START DEPTH 2..J,S2.5 2S1.J.5 STO!? DEPTH ..J,"73"7.0 -!~9-:- .0 # L()G HEÞ.DEP. D.::'.T':'. D,:c..TE LOGGED: SOFTVJ.i:..RE SUF.F.:"'CE SOFTlrI.:'.P.E '.'EP.S Icm: DOvJIJHOLE SOFT\¡Ii->.F.E \'EF.SIon: D;o.T.:'. T".LPE (HEUOP.:: OF. PE.:"L-TIUE) : 'I'D DP.ILLEP \ FT) : TOP LOG I1ITEP.V.:"L (FT): BOTTOU L()(; II TTEP.',~';L \ FT : BIT P.OT.:"'TIIIG SPEED (P'Pll): HOLE nICLIlJ.:',TIOlJ (DEG UIlIIHuTI .:'J IGLE : 1.I;>~.: HIU1.I ,:'j'IGLE: # TOOL STP.IlIG (TOP TO BOTTC)I.j) ~:EITDOP TOOL CODE TOOL T'/I?E UGP lL:'_TTJP~:'.L G.:'1.11 U". I?ROBE ... ." # BOF:EHOL£ .~JTD C.:'.SIlJG DAT,:', OPElI HOLE BIT S1:£ (III I : DPILLEP.' S C.::'.SIITG DEPTH (FT): # BOP.EHOLE COllDITIons UUD riPE: I.IUD DElTSITJ.' \ LB G) : UUD "..'ISCOSIT": (S I : UUD PH: [.IUD CHLOPIDES (PPI.!): FLUID LOSS (C3): P.£SISTI',,"ITJ.' (OH[.IHI .::..1' TEl-IPEP_::"TUP.E (DEGF I 1-'1UD ,:','1' [.IE.::',SUP.ED TEUPEP_:'.TUP.E \ HT I : [.IUD .:'.'1' I.U-.X CIFCUL;",TIl.JG TEPJIPEF~:'.TURE: l-IUD FIL TP~::'.TE AT [.IT: I,IUD C.:'XE .:'.T I.IT: # lJEUTP.OIJ TOOL IL::"TP.I:': : ['L;TRI~': DEUSITJ.': HOLE COP.P.ECTIOll \ Ill) : # TOOL ST;.j,JDOFF (Ill I : EWP. FPEQUEHCY 1HZ): # p, EI.L:'.F.I-:S : s # Daea Format Specification P.ecord Daea Record T~"pe. . . . . . . . . . . . . . . . . .0 Data Specification Block T~~e.....O Logging Direction.,.............. . Down Ope lcal log depth uni ts. . , . , . . . . , . Feet Data Feference POlne.,....,...... .Undefined F r arne S pac l ng. . . . . . . . . , . . . . . . . . . , . 6 Û . 1 I t'j Max frames per record............ .Undefined ¡:'.bsent ':alue...........,.......... -999 Dep t h Un its. . . . . . . . . . . . . . . . . . . . . . . Datum Specification Block sub-t:'-"pe... 0 2 "7 - J ':'j', 1- 0 2 Insite 0 Uemory 47901.0 2519.0 479..,1.0 1.3 3..1.0 TOOL IIŒ,IBEP. .113 8.500 \i,Ia ter 9.20 <-12.0 9.5 1100 6.ì Based .000 .000 .000 .000 .0 86.8 .0 . û [Jame Ser:.~i ce Order iJnits Size Usam Pep Code Offsee Channel DEP1' FT '¡ 1 68 0 1 P.()P HvvDO 2 (I FT H -l 1 6';:' .:! 2 u I::; p. HlrW02 Ù .:"'PI .J 1 68 8 3 First Lase 1 J arne Ser: ice Unit Uin I.lax [.Jean lJsam P.eading P.eading DEPT FT 2.J.52.5 .J.-;-'97 362.J.."75 .,1690 2.,152.5 .J."79"7 P.()P llVlD020 F1' H 8.-1--1 198.J..7.,1 31-1.101 .:.1566 251.,1.5 -1797 GF. U\¡IJD020 .;PI 5.9-1 137.38 75. ~'.J15 -15"70 2452.5 -1-''''''''' . :) l First Reading For Entire File......... .2.,152.5 Last Reading For Entire File..... .... . .-1797 File Trailer Ser"ice name............ .STSLIB.OO3 Ser,'ice Sub Le~el []ame... '.~ersion [.Jurnber........... 1 . Û. I) Date of Generation...... .02 03 21 ITa:Ömum Ph~'sical "Record.. 65535 F i 1 e T~rpe. . . . . . . . . . . . . . . . LO lTe:.~t File lJame. . . . . . . . . . . STSLIB. 00.;1 Ph~"s i ca 1 EQF Tape Trailer Se:c:ice name............ .LISTPE Da t e. . . . . . . . . . . . . . . . . . . . . 02 03 21 Or ig in. . . . . . . . . . . . . . . . . . . S1'S Tape Harne. . . . . . . . . . . . . . . . UlJFI10lrJU Continuation LJumber..... .01 lJext Tape Uame. . . . . . . . . . . iJìJ!l._lJOlm,] Comments................ .STS LIS l,vr it i ng Libr a r~/ . Scientific Technical Ser:ices Reel Trailer Ser'ice name.. . . . . . . . . . . . LISTPE Da t e. . . . . . . . . . . . . . . . . . . . . 02 0 3 21 Orl.gin. . . . . . . . . . . . . . . . . . . STS F.eel lJarne. . . . . . . . . . . . . . . . mTKlJOír1lj Continuation lJumber..... .01 Uext Peel lJame. . . . . . . . . . . UlW.llOiJInT Comments................ .51'5 LIS Writing Library. Sc ien t i fie Technical Ser: ices Ph~"s ieal EOF Ph~'s iea 1 EOF End Of LIS Flle