Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAbout224-131DA
T
A
S
U
B
M
I
T
T
A
L
C
O
M
P
L
I
A
N
C
E
R
E
P
O
R
T
AP
I
N
o
.
50
-
0
2
9
-
2
3
8
0
5
-
0
0
-
0
0
We
l
l
N
a
m
e
/
N
o
.
MI
L
N
E
P
T
U
N
I
T
J
-
4
6
Co
m
p
l
e
t
i
o
n
S
t
a
t
u
s
1-
O
I
L
Co
m
p
l
e
t
i
o
n
D
a
t
e
11
/
2
9
/
2
0
2
4
Pe
r
m
i
t
t
o
D
r
i
l
l
22
4
1
3
1
0
Op
e
r
a
t
o
r
Hi
l
c
o
r
p
A
l
a
s
k
a
,
L
L
C
MD
16
2
5
5
TV
D
42
9
4
Cu
r
r
e
n
t
S
t
a
t
u
s
1-
O
I
L
10
/
8
/
2
0
2
5
UI
C
No
We
l
l
L
o
g
I
n
f
o
r
m
a
t
i
o
n
:
Di
g
i
t
a
l
Me
d
/
F
r
m
t
Re
c
e
i
v
e
d
St
a
r
t
S
t
o
p
OH
/
CH
Co
m
m
e
n
t
s
Lo
g
Me
d
i
a
Ru
n
No
El
e
c
t
r
Da
t
a
s
e
t
Nu
m
b
e
r
Na
m
e
In
t
e
r
v
a
l
Li
s
t
o
f
L
o
g
s
O
b
t
a
i
n
e
d
:
RO
P
/
M
W
D
/
G
R
/
R
E
S
No
No
Ye
s
Mu
d
L
o
g
S
a
m
p
l
e
s
D
i
r
e
c
t
i
o
n
a
l
S
u
r
v
e
y
RE
Q
U
I
R
E
D
I
N
F
O
R
M
A
T
I
O
N
(f
r
o
m
M
a
s
t
e
r
W
e
l
l
D
a
t
a
/
L
o
g
s
)
DA
T
A
I
N
F
O
R
M
A
T
I
O
N
Lo
g
/
Da
t
a
Ty
p
e
Lo
g
Sc
a
l
e
DF
12
/
1
9
/
2
0
2
4
52
3
7
1
6
2
1
8
E
l
e
c
t
r
o
n
i
c
D
a
t
a
S
e
t
,
F
i
l
e
n
a
m
e
:
M
P
U
J
-
4
6
A
D
R
Qu
a
d
r
a
n
t
s
A
l
l
C
u
r
v
e
s
.
l
a
s
39
8
9
0
ED
Di
g
i
t
a
l
D
a
t
a
DF
12
/
1
9
/
2
0
2
4
13
8
1
6
2
5
6
E
l
e
c
t
r
o
n
i
c
D
a
t
a
S
e
t
,
F
i
l
e
n
a
m
e
:
M
P
U
J
-
4
6
L
W
D
Fi
n
a
l
.
l
a
s
39
8
9
0
ED
Di
g
i
t
a
l
D
a
t
a
DF
12
/
1
9
/
2
0
2
4
E
l
e
c
t
r
o
n
i
c
F
i
l
e
:
M
P
U
J
-
4
6
G
e
o
s
t
e
e
r
i
n
g
F
i
n
a
l
Lo
g
s
.
e
m
f
39
8
9
0
ED
Di
g
i
t
a
l
D
a
t
a
DF
12
/
1
9
/
2
0
2
4
E
l
e
c
t
r
o
n
i
c
F
i
l
e
:
M
P
U
J
-
4
6
G
e
o
s
t
e
e
r
i
n
g
E
n
d
o
f
W
e
l
l
R
e
p
o
r
t
F
i
n
a
l
.
p
d
f
39
8
9
0
ED
Di
g
i
t
a
l
D
a
t
a
DF
12
/
1
9
/
2
0
2
4
E
l
e
c
t
r
o
n
i
c
F
i
l
e
:
M
P
U
J
-
4
6
G
e
o
s
t
e
e
r
i
n
g
F
i
n
a
l
Lo
g
s
.
p
d
f
39
8
9
0
ED
Di
g
i
t
a
l
D
a
t
a
DF
12
/
1
9
/
2
0
2
4
E
l
e
c
t
r
o
n
i
c
F
i
l
e
:
M
P
U
J
-
4
6
P
o
s
t
-
W
e
l
l
G
e
o
s
t
e
e
r
i
n
g
X-
S
e
c
t
i
o
n
S
u
m
m
a
r
y
.
p
d
f
39
8
9
0
ED
Di
g
i
t
a
l
D
a
t
a
DF
12
/
1
9
/
2
0
2
4
E
l
e
c
t
r
o
n
i
c
F
i
l
e
:
H
i
l
c
o
r
p
M
P
U
J
-
4
6
G
e
o
s
t
e
e
r
i
n
g
da
i
l
y
r
e
p
o
r
t
a
t
1
2
8
7
0
'
M
D
.
p
d
f
39
8
9
0
ED
Di
g
i
t
a
l
D
a
t
a
DF
12
/
1
9
/
2
0
2
4
E
l
e
c
t
r
o
n
i
c
F
i
l
e
:
H
i
l
c
o
r
p
M
P
U
J
-
4
6
G
e
o
s
t
e
e
r
i
n
g
da
i
l
y
r
e
p
o
r
t
a
t
1
4
0
6
8
'
M
D
.
p
d
f
39
8
9
0
ED
Di
g
i
t
a
l
D
a
t
a
DF
12
/
1
9
/
2
0
2
4
E
l
e
c
t
r
o
n
i
c
F
i
l
e
:
H
i
l
c
o
r
p
M
P
U
J
-
4
6
G
e
o
s
t
e
e
r
i
n
g
da
i
l
y
r
e
p
o
r
t
a
t
1
5
5
5
0
'
M
D
.
p
d
f
39
8
9
0
ED
Di
g
i
t
a
l
D
a
t
a
DF
12
/
1
9
/
2
0
2
4
E
l
e
c
t
r
o
n
i
c
F
i
l
e
:
H
i
l
c
o
r
p
M
P
U
J
-
4
6
G
e
o
s
t
e
e
r
i
n
g
da
i
l
y
r
e
p
o
r
t
a
t
1
6
2
5
5
M
D
.
_
F
T
D
.
p
d
f
39
8
9
0
ED
Di
g
i
t
a
l
D
a
t
a
DF
12
/
1
9
/
2
0
2
4
E
l
e
c
t
r
o
n
i
c
F
i
l
e
:
H
i
l
c
o
r
p
M
P
U
J
-
4
6
G
e
o
s
t
e
e
r
i
n
g
da
i
l
y
r
e
p
o
r
t
a
t
5
7
8
0
'
M
D
.
p
d
f
39
8
9
0
ED
Di
g
i
t
a
l
D
a
t
a
DF
12
/
1
9
/
2
0
2
4
E
l
e
c
t
r
o
n
i
c
F
i
l
e
:
H
i
l
c
o
r
p
M
P
U
J
-
4
6
G
e
o
s
t
e
e
r
i
n
g
da
i
l
y
r
e
p
o
r
t
a
t
7
2
6
7
'
M
D
.
p
d
f
39
8
9
0
ED
Di
g
i
t
a
l
D
a
t
a
DF
12
/
1
9
/
2
0
2
4
E
l
e
c
t
r
o
n
i
c
F
i
l
e
:
H
i
l
c
o
r
p
M
P
U
J
-
4
6
G
e
o
s
t
e
e
r
i
n
g
da
i
l
y
r
e
p
o
r
t
a
t
9
5
5
0
'
M
D
.
p
d
f
39
8
9
0
ED
Di
g
i
t
a
l
D
a
t
a
We
d
n
e
s
d
a
y
,
O
c
t
o
b
e
r
8
,
2
0
2
5
AO
G
C
C
P
a
g
e
1
o
f
3
MP
U
J
-
4
6
L
W
D
Fi
n
al.
l
as
DA
T
A
S
U
B
M
I
T
T
A
L
C
O
M
P
L
I
A
N
C
E
R
E
P
O
R
T
AP
I
N
o
.
50
-
0
2
9
-
2
3
8
0
5
-
0
0
-
0
0
We
l
l
N
a
m
e
/
N
o
.
MI
L
N
E
P
T
U
N
I
T
J
-
4
6
Co
m
p
l
e
t
i
o
n
S
t
a
t
u
s
1-
O
I
L
Co
m
p
l
e
t
i
o
n
D
a
t
e
11
/
2
9
/
2
0
2
4
Pe
r
m
i
t
t
o
D
r
i
l
l
22
4
1
3
1
0
Op
e
r
a
t
o
r
Hi
l
c
o
r
p
A
l
a
s
k
a
,
L
L
C
MD
16
2
5
5
TV
D
42
9
4
Cu
r
r
e
n
t
S
t
a
t
u
s
1-
O
I
L
10
/
8
/
2
0
2
5
UI
C
No
We
l
l
C
o
r
e
s
/
S
a
m
p
l
e
s
I
n
f
o
r
m
a
t
i
o
n
:
Re
c
e
i
v
e
d
St
a
r
t
S
t
o
p
C
o
m
m
e
n
t
s
To
t
a
l
Bo
x
e
s
Sa
m
p
l
e
Se
t
Nu
m
b
e
r
Na
m
e
In
t
e
r
v
a
l
IN
F
O
R
M
A
T
I
O
N
R
E
C
E
I
V
E
D
DF
12
/
1
9
/
2
0
2
4
E
l
e
c
t
r
o
n
i
c
F
i
l
e
:
H
i
l
c
o
r
p
M
P
U
J
-
4
6
G
e
o
s
t
e
e
r
i
n
g
Pr
e
W
e
l
l
R
e
p
o
r
t
.
p
d
f
39
8
9
0
ED
Di
g
i
t
a
l
D
a
t
a
DF
12
/
1
9
/
2
0
2
4
E
l
e
c
t
r
o
n
i
c
F
i
l
e
:
M
P
U
J
-
4
3
L
W
D
F
i
n
a
l
T
V
D
.
p
d
f
39
8
9
0
ED
Di
g
i
t
a
l
D
a
t
a
DF
12
/
1
9
/
2
0
2
4
E
l
e
c
t
r
o
n
i
c
F
i
l
e
:
M
P
U
J
-
4
3
L
W
D
F
i
n
a
l
M
D
.
t
i
f
39
8
9
0
ED
Di
g
i
t
a
l
D
a
t
a
DF
12
/
1
9
/
2
0
2
4
E
l
e
c
t
r
o
n
i
c
F
i
l
e
:
M
P
U
J
-
4
3
L
W
D
F
i
n
a
l
T
V
D
.
t
i
f
39
8
9
0
ED
Di
g
i
t
a
l
D
a
t
a
DF
12
/
1
9
/
2
0
2
4
E
l
e
c
t
r
o
n
i
c
F
i
l
e
:
M
P
U
J
-
4
6
G
e
o
s
t
e
e
r
i
n
g
F
i
n
a
l
Lo
g
s
H
R
.
t
i
f
39
8
9
0
ED
Di
g
i
t
a
l
D
a
t
a
DF
12
/
1
9
/
2
0
2
4
E
l
e
c
t
r
o
n
i
c
F
i
l
e
:
M
P
U
J
-
4
6
G
e
o
s
t
e
e
r
i
n
g
F
i
n
a
l
Lo
g
s
L
R
.
t
i
f
39
8
9
0
ED
Di
g
i
t
a
l
D
a
t
a
DF
12
/
1
9
/
2
0
2
4
E
l
e
c
t
r
o
n
i
c
F
i
l
e
:
M
P
U
J
-
4
3
L
W
D
F
i
n
a
l
M
D
.
c
g
m
39
8
9
0
ED
Di
g
i
t
a
l
D
a
t
a
DF
12
/
1
9
/
2
0
2
4
E
l
e
c
t
r
o
n
i
c
F
i
l
e
:
M
P
U
J
-
4
3
L
W
D
F
i
n
a
l
T
V
D
.
c
g
m
39
8
9
0
ED
Di
g
i
t
a
l
D
a
t
a
DF
12
/
1
9
/
2
0
2
4
E
l
e
c
t
r
o
n
i
c
F
i
l
e
:
M
P
U
J
-
4
6
.
t
x
t
39
8
9
0
ED
Di
g
i
t
a
l
D
a
t
a
DF
12
/
1
9
/
2
0
2
4
E
l
e
c
t
r
o
n
i
c
F
i
l
e
:
M
P
U
J
-
4
6
_
D
e
f
i
n
i
t
i
v
e
s
u
r
v
e
y
re
p
o
r
t
.
p
d
f
39
8
9
0
ED
Di
g
i
t
a
l
D
a
t
a
DF
12
/
1
9
/
2
0
2
4
E
l
e
c
t
r
o
n
i
c
F
i
l
e
:
M
P
U
J
-
4
6
_
f
i
n
a
l
s
u
r
v
e
y
s
.
x
l
s
x
39
8
9
0
ED
Di
g
i
t
a
l
D
a
t
a
DF
12
/
1
9
/
2
0
2
4
E
l
e
c
t
r
o
n
i
c
F
i
l
e
:
M
P
U
J
-
4
6
_
G
I
S
.
t
x
t
39
8
9
0
ED
Di
g
i
t
a
l
D
a
t
a
DF
12
/
1
9
/
2
0
2
4
E
l
e
c
t
r
o
n
i
c
F
i
l
e
:
M
P
U
J
-
4
6
_
P
l
a
n
.
p
d
f
39
8
9
0
ED
Di
g
i
t
a
l
D
a
t
a
DF
12
/
1
9
/
2
0
2
4
E
l
e
c
t
r
o
n
i
c
F
i
l
e
:
M
P
U
J
-
4
6
_
V
S
e
c
.
p
d
f
39
8
9
0
ED
Di
g
i
t
a
l
D
a
t
a
DF
12
/
1
9
/
2
0
2
4
E
l
e
c
t
r
o
n
i
c
F
i
l
e
:
M
P
U
J
-
4
3
L
W
D
F
i
n
a
l
M
D
.
e
m
f
39
8
9
0
ED
Di
g
i
t
a
l
D
a
t
a
DF
12
/
1
9
/
2
0
2
4
E
l
e
c
t
r
o
n
i
c
F
i
l
e
:
M
P
U
J
-
4
3
L
W
D
F
i
n
a
l
T
V
D
.
e
m
f
39
8
9
0
ED
Di
g
i
t
a
l
D
a
t
a
DF
12
/
1
9
/
2
0
2
4
E
l
e
c
t
r
o
n
i
c
F
i
l
e
:
M
P
U
_
J
-
4
6
_
A
D
R
_
I
m
a
g
e
.
d
l
i
s
39
8
9
0
ED
Di
g
i
t
a
l
D
a
t
a
DF
12
/
1
9
/
2
0
2
4
E
l
e
c
t
r
o
n
i
c
F
i
l
e
:
M
P
U
_
J
-
4
6
_
A
D
R
_
I
m
a
g
e
.
v
e
r
39
8
9
0
ED
Di
g
i
t
a
l
D
a
t
a
DF
12
/
1
9
/
2
0
2
4
E
l
e
c
t
r
o
n
i
c
F
i
l
e
:
M
P
U
J
-
4
3
L
W
D
F
i
n
a
l
M
D
.
p
d
f
39
8
9
0
ED
Di
g
i
t
a
l
D
a
t
a
We
d
n
e
s
d
a
y
,
O
c
t
o
b
e
r
8
,
2
0
2
5
AO
G
C
C
P
a
g
e
2
o
f
3
DA
T
A
S
U
B
M
I
T
T
A
L
C
O
M
P
L
I
A
N
C
E
R
E
P
O
R
T
AP
I
N
o
.
50
-
0
2
9
-
2
3
8
0
5
-
0
0
-
0
0
We
l
l
N
a
m
e
/
N
o
.
MI
L
N
E
P
T
U
N
I
T
J
-
4
6
Co
m
p
l
e
t
i
o
n
S
t
a
t
u
s
1-
O
I
L
Co
m
p
l
e
t
i
o
n
D
a
t
e
11
/
2
9
/
2
0
2
4
Pe
r
m
i
t
t
o
D
r
i
l
l
22
4
1
3
1
0
Op
e
r
a
t
o
r
Hi
l
c
o
r
p
A
l
a
s
k
a
,
L
L
C
MD
16
2
5
5
TV
D
42
9
4
Cu
r
r
e
n
t
S
t
a
t
u
s
1-
O
I
L
10
/
8
/
2
0
2
5
UI
C
No
Co
m
p
l
e
t
i
o
n
R
e
p
o
r
t
Pr
o
d
u
c
t
i
o
n
T
e
s
t
I
n
f
o
r
m
a
t
i
o
n
Ge
o
l
o
g
i
c
M
a
r
k
e
r
s
/
T
o
p
s
Y Y
/
N
A
Y
Co
m
m
e
n
t
s
:
Co
m
p
l
i
a
n
c
e
R
e
v
i
e
w
e
d
B
y
:
Da
t
e
:
Mu
d
L
o
g
s
,
I
m
a
g
e
F
i
l
e
s
,
D
i
g
i
t
a
l
D
a
t
a
Co
m
p
o
s
i
t
e
L
o
g
s
,
I
m
a
g
e
,
D
a
t
a
F
i
l
e
s
Cu
t
t
i
n
g
s
S
a
m
p
l
e
s
Y
/
N
A
Y Y
/
N
A
Di
r
e
c
t
i
o
n
a
l
/
I
n
c
l
i
n
a
t
i
o
n
D
a
t
a
Me
c
h
a
n
i
c
a
l
I
n
t
e
g
r
i
t
y
T
e
s
t
I
n
f
o
r
m
a
t
i
o
n
Da
i
l
y
O
p
e
r
a
t
i
o
n
s
S
u
m
m
a
r
y
Y Y
/
N
A
Y
Co
r
e
C
h
i
p
s
Co
r
e
P
h
o
t
o
g
r
a
p
h
s
La
b
o
r
a
t
o
r
y
A
n
a
l
y
s
e
s
Y
/
N
A
Y
/
N
A
Y
/
N
A
CO
M
P
L
I
A
N
C
E
H
I
S
T
O
R
Y
Da
t
e
C
o
m
m
e
n
t
s
De
s
c
r
i
p
t
i
o
n
Co
m
p
l
e
t
i
o
n
D
a
t
e
:
11
/
2
9
/
2
0
2
4
Re
l
e
a
s
e
D
a
t
e
:
10
/
2
5
/
2
0
2
4
We
d
n
e
s
d
a
y
,
O
c
t
o
b
e
r
8
,
2
0
2
5
AO
G
C
C
P
a
g
e
3
o
f
3
10
/
9
/
2
0
2
5
M.
G
u
h
l
1. Type of Request: Abandon Plug Perforations Fracture Stimulate Repair Well Operations shutdown
Suspend Perforate Other Stimulate Pull Tubing Change Approved Program
Plug for Redrill Perforate New Pool Re-enter Susp Well Alter Casing Other: ESP Swap
2. Operator Name: 4. Current Well Class: 5. Permit to Drill Number:
Exploratory Development
3. Address:Stratigraphic Service
6. API Number:
7. If perforating:8. Well Name and Number:
What Regulation or Conservation Order governs well spacing in this pool?
Yes No
9. Property Designation (Lease Number): 10. Field:
11.
Total Depth MD (ft): Total Depth TVD (ft): Effective Depth MD: Effective Depth TVD: Junk (MD):
16,255'N/A
Casing Collapse
Conductor N/A
Surface 4,760psi
Surface 3,090psi
Tieback 5,410psi
Liner 250҄ Screens 8,830psi
Liner 250 Screens 8,540psi
Packers and SSSV Type: Packers and SSSV MD (ft) and TVD (ft):
12. Attachments: Proposal Summary Wellbore schematic 13. Well Class after proposed work:
Detailed Operations Program BOP Sketch Exploratory Stratigraphic Development Service
14. Estimated Date for 15. Well Status after proposed work:
Commencing Operations: OIL WINJ WDSPL Suspended
16. Verbal Approval: Date: GAS WAG GSTOR SPLUG
AOGCC Representative: GINJ Op Shutdown Abandoned
Contact Name:
Contact Email:
Contact Phone:
Authorized Title: Wells Manager
Conditions of approval: Notify AOGCC so that a representative may witness Sundry Number:
Plug Integrity BOP Test Mechanical Integrity Test Location Clearance
Other Conditions of Approval:
Post Initial Injection MIT Req'd? Yes No
APPROVED BY
Approved by: COMMISSIONER THE AOGCC Date:
Comm. Comm. Sr Pet Eng Sr Pet Geo Sr Res Eng
MILNE PT UNIT J-46
MILNE POINT SCHRADER BLUFF OIL N/A
4,294' 16,254' 4,294' 1,171 N/A
Subsequent Form Required:
Suspension Expiration Date:
Will perfs require a spacing exception due to property boundaries?
Current Pools:
MPSP (psi): Plugs (MD):
17. I hereby certify that the foregoing is true and the procedure approved herein will not be deviated from without prior written approval.
Authorized Name and
Digital Signature with Date:
Tubing Size:
PRESENT WELL CONDITION SUMMARY
AOGCC USE ONLY
9,020psi
Tubing Grade: Tubing MD (ft):Perforation Depth TVD (ft):
5/1/2025
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
APPLICATION FOR SUNDRY APPROVALS
20 AAC 25.280
ADL025518 & ADL025906
224-131
3800 Centerpoint Dr, Suite 1400 Anchorage, AK 99503 50-029-23805-00-00
Hilcorp Alaska LLC
477.005
Length Size
Proposed Pools:
167' 167'
13.5 / L-80 / TXP
TVD Burst
4,759'
9,190psi
MD
N/A
7,240psi
6,870psi
5,750psi
2,068'
3,968'
3,944'
2,156'
5,248'
4,010'5-1/2"
167' 20"
9-5/8"
9-5/8"
2,156'
7"5,052'
3,092'
6,248'
Perforation Depth MD (ft):
5,052'
See Schematic
1,209'
4-1/2"
See Schematic
16,255'10,007'
3-1/2"
4,294'
SLZXP LTP and N/A 5,039 MD / 3,942 TVD and N/A
Todd Sidoti
todd.sidoti@hilcorp.com
777-8443
No
Form 10-403 Revised 06/2023 Approved application valid for 12 months from date of approval.Submit PDF to aogcc.permitting@alaska.gov
By Grace Christianson at 1:35 pm, Apr 16, 2025
Digitally signed by Taylor
Wellman (2143)
DN: cn=Taylor Wellman (2143)
Date: 2025.04.16 12:18:47 -
08'00'
Taylor Wellman
(2143)
325-233
MGR18APR2025
* BOPE test to 2000 psi.
10-404
DSR-4/17/25SFD 4/21/2025*&:
Jessie L.
Chmielowski
Digitally signed by Jessie L.
Chmielowski
Date: 2025.04.21 13:48:56 -08'00'04/21/25
RBDMS JSB 042225
ESP Change-Out
Well: MPU J-46
Well Name: MPU J-46 API Number: 50-029-23805-00
Current Status: Shut-in ESP Producer Pad: G-Pad
Estimated Start Date: May 1st 2024 Rig: ASR
Reg. Approval Req’d? Yes Date Reg. Approval Rec’vd:
Regulatory Contact: Tom Fouts Permit to Drill Number: 224-131
First Call Engineer: Todd Sidoti (907)-777-8443 (O) (907) 632-4113 (M)
Second Call Engineer: Taylor Wellman (907) 777-8449 (O)(907) 947-9553 (M)
AFE Number:
Current Bottom Hole Pressure: 1562 psi @ 3,914’ TVD ESP Pressure Gauge 12/3/24 – 7.7 PPG
Maximum Expected BHP: 1562 psi @ 3,914’ TVD ESP Pressure Gauge 12/3/24 – 7.7 PPG
MPSP: 1171 psi Gas Column Gradient (0.1 psi/ft)
70° Inclination ~4,000’ MD
Brief Well Summary:
MPU producer J-46 was drilled and completed as a Nb producer in 2024. The well was brought on-line making
fluid rates much higher than expected and the ESP is running in upthrust. This condition can severely reduce
the run life of the pump. The purpose of this project is to have a contingent upsized ESP pump ready to go in
case of failure.
Notes Regarding Wellbore Condition
x MIT-OA to 1,500 psi on 11/26/2024.
Objective:
x Pull 3-1/2” ESP completion
x Install new 3-1/2” ESP completion
Non- Sundried work
Slickline:
1. Pull bottom GLV and leave open
2. Pull top GLV and dummy off
Sundried Procedure (Approval Required to Proceed)
Fullbore:
3. RU FB and PT lines to 3,000 psi.
4. Pump diesel spear followed by 250 bbls KWF (source water) down the tubing taking returns up the IA.
5.Confirm well is dead.
6. RD FB.
7. Clear and level pad area in front of well. Spot rig mats and containment.
8. RD well house and flowlines. Clear and level area around well.
9. RU crane. Set BPV. ND Tree. Inspect the tubing hanger lift thread and note any damage.
10. NU BOPE. RD Crane.
11. Spot mud boat.
ESP Change-Out
Well: MPU J-46
RWO Procedure:
12. MIRU Hilcorp ASR #1 WO Rig, ancillary equipment, and lines to returns tank.
13. If needed, bleed off any residual pressure off the IA. Check for pressure and if 0 psi, pull BPV. If
needed, kill well with KWF prior to pulling BPV.
14. Set TWC.
15. Test BOPE to 250 psi Low/ 2,000 psi High, annular to 250 psi Low/ 2,000 psi High (hold each ram/valve
and test for 5-min). Record accumulator pre-charge pressures and chart tests.
a. Notify AOGCC 24 hours in advance of BOP test.
b. Perform Test per “ASR 1 BOP Test Procedure”
c. Confirm test pressures per the Sundry Conditions of approval.
d. Test VBR ram on 3-1/2” test joint.
e. Submit to AOGCC completed 10-424 form within 5 days of BOPE test.
16. Bleed any pressure off casing to 500 bbl returns tank. Pull TWC. Kill well w/ KWF as needed.
17. Rig up spoolers for ESP cable.
18. MU landing joint or spear, BOLDS and PU on the tubing hanger.
a. PUW was 93klbs and SO was 77klbs during installation. Block weight was 44klbs.
19. Lay down tubing hanger.
20. POOH and lay down the 3-1/2” tubing while spooling ESP cable. Lay down ESP and motor.
a. Inspect the connections
b. Re-use existing TBG, Inspect the connections
c. ESP to be saved for inspection and re-use
d. Note any sand or scale inside or on the outside of the ESP in WSR
e. The completion has the following amount of clamps:
i. 87 Cross Collar Clamps
ii. 10 Pump/Seal Clamps
iii. 3 Motor Clamps
21. PU new ESP and RIH on 3-1/2” 9.3# TXP tubing. Set base of ESP assembly at ± 4,750’ MD.
a. Check ESP cable conductivity every 2,000’
Proposed Running Order
a. Base of ESP centralizer @ ±4,750’ MD
b. Motor gauge
c. Summit Motor 456
d. Gas Separator
e. Summit 400 series SFNPSH78 Pump
f. Summit 400 series SF3400 Motor
g. Downhole gauge for discharge temperature and pressure.
h. 1 joint of 3-1/2”
i. 3-1/2” XN (2.750” No-Go) Nipple on pups
ESP Change-Out
Well: MPU J-46
j. 1 joint of 3-1/2”
k. Lower 3-1/2” GLM with Dummy GLV
l. ± XXX joints 3-1/2”
m. GLM, 3-1/2”, OV installed with pups (setting depth +/- 200’ MD).
n. +/- XXX joints, 3-1/2”
22. PU and MU the 3-1/2” tubing hanger with landing joint. Make the final splice of the ESP cable to the
penetrator, MU the chemical injection line to the tubing hanger. Plug off any additional control line
ports if present.
23. Land the tubing hanger and RILDS (Caution do not damage the Cable when landing). Lay down landing
joint. Note Pick-up and slack-off weights on tally.
24. Set TWC.
25. RDMO ASR.
Post-Rig Procedure:
26. RD mud boat. RD BOPE house. Move to next well location.
27. RU crane. ND BOPE.
28. NU the tubing head adapter and tree. Test tubing hanger void and tree to 500 psi low/5,000 psi high.
29. Pull TWC.
30. RD crane. Move returns tank and rig mats to next well location.
31. Replace gauge(s) if removed.
32. Turn well over to production. RU well house and flowlines.
Attachments:
1. As-built Schematic
2. Proposed Schematic
3. BOP Schematic
_____________________________________________________________________________________
Revised By: TDF 4/15/2025
SCHEMATIC
Milne Point Unit
Well: MPU J-46
Last Completed: 11/29/2024
PTD: 224-131
TD =16,255’(MD) / TD =4,294’ (TVD)
20”
Orig. KB Elev.:66.23’/ GL Elev.:32.6’
7”
15
9-5/8”
1
2
3
5-1/2” XO
4-1/2”
@7,000’
See
Screen/
Solid
Liner
Detail
PBTD =16,254’(MD) / PBTD =4,294’ (TVD)
9-5/8”
Fidelis
Cementer
@ 2,144’
14
16
3-1/2”
4,5&6
7
8&9
12&13
10&11
CASING DETAIL
Size Type Wt/ Grade/ Conn ID Top Btm BPF
20" Conductor 129.5 / X52 / Weld N/A Surface 167’ N/A
9-5/8" Surface 47 / L-80 / TXP 8.681 Surface 2,156’ 0.0732
9-5/8” Surface 40 / L-80 / TXP 8.835 2,156’ 5,248’ 0.0758
7” Tieback 26 / L-80 / TXP 6.276 Surface 5,052’ 0.0459
5-1/2” Liner 250ђ Screens 20 / L-80 / EZGO HT 4.780 5,039’ 6,248’ 0.0222
4-1/2” Liner 250ђ Screens 13.5 / L-80 / Hyd 625 3.920 6,248’ 16,255’ 0.0149
TUBING DETAIL
3-1/2" Tubing 9.3# / L-80 / TXP 2.992 Surface 4,759’ 0.087
OPEN HOLE / CEMENT DETAIL
24” x Driven 9 yds Concrete
12-1/4"Stg 1 Lead –365 sx / Tail –400 sx
Stg 2 Lead – 870 sx / Tail 270 sx
8-1/2” Cementless Screened Liner
WELL INCLINATION DETAIL
KOP @ 480’
90° Hole Angle = @ 8,100’
TREE & WELLHEAD
Tree Cameron 3-1/8" 5M w/ 3-1/8” 5M Cameron Wing
Wellhead FMC 11” 5K x sliplock bottom w/ (2) 2-1/16” 5K outs
GENERAL WELL INFO
API: 50-029-23805-00-00
Completion Date: 11/29/2024
JEWELRY DETAIL
No. MD Item ID
1 103’ GLM 3-1/2” x 1” with DPSOV Installed 2.992”
2 4,198’ GLM 3-1/2” x 1” with DV Installed 2.992”
3 4,253’ XN Nipple 2.813” with 2.75” No Go 2.750“
4 4,665’ Pressure Discharge Sub: Vigilant Sensor
5 4,666’ Discharge Head
6 4,667’ Pump #2 Summit 400
7 4,689’ Pump #1 Summit 400
8 4,711’ Gas Separator
9 4,712’ Upper Tandem Seal
10 4,720’ Lower Tandem Seal
11 4,728’ Motor: Summit 456, 240 HP / 3040 V / 56 A
12 4,754’ Motor Gauge: 8 KPSI, 2xPres, 2xTemp, 2xVib
13 4,757’ Centralizer: Anode
14 5,039’ SLZXP LTP (11.28’ Tieback Sleeve) 6.180”
15 6,248’ 5-1/2” x 4-1/2” XO 3.920”
16 16,878’ Shoe
5-1/2” x 4-1/2”SCREENS LINER DETAIL
Size Top
(MD)
Top
(TVD)
Btm
(MD)
Btm
(TVD)
5-1/2” 5278’ 3972’ 6248’ 4010’
4-1/2” 6250’ 4010’ 16216’ 4294’
_____________________________________________________________________________________
Revised By: TDF 4/15/2025
PROPOSED
Milne Point Unit
Well: MPU J-46
Last Completed: 11/29/2024
PTD: 224-131
TD =16,255’(MD) / TD =4,294’ (TVD)
20”
Orig. KB Elev.:66.23’/ GL Elev.:32.6’
7”
15
9-5/8”
1
2
3
5-1/2” XO
4-1/2”
@7,000’
See
Screen/
Solid
Liner
Detail
PBTD =16,254’(MD) / PBTD =4,294’ (TVD)
9-5/8”
Fidelis
Cementer
@ 2,144’
14
16
3-1/2”
4,5&6
7
8&9
12&13
10&11
CASING DETAIL
Size Type Wt/ Grade/ Conn ID Top Btm BPF
20" Conductor 129.5 / X52 / Weld N/A Surface 167’ N/A
9-5/8" Surface 47 / L-80 / TXP 8.681 Surface 2,156’ 0.0732
9-5/8” Surface 40 / L-80 / TXP 8.835 2,156’ 5,248’ 0.0758
7” Tieback 26 / L-80 / TXP 6.276 Surface 5,052’ 0.0459
5-1/2” Liner 250ђ Screens 20 / L-80 / EZGO HT 4.780 5,039’ 6,248’ 0.0222
4-1/2” Liner 250ђ Screens 13.5 / L-80 / Hyd 625 3.920 6,248’ 16,255’ 0.0149
TUBING DETAIL
3-1/2" Tubing 9.3# / L-80 / TXP 2.992 Surface ±X,XXX’ 0.087
OPEN HOLE / CEMENT DETAIL
24” x Driven 9 yds Concrete
12-1/4"Stg 1 Lead –365 sx / Tail –400 sx
Stg 2 Lead – 870 sx / Tail 270 sx
8-1/2” Cementless Screened Liner
WELL INCLINATION DETAIL
KOP @ 480’
90° Hole Angle = @ 8,100’
TREE & WELLHEAD
Tree Cameron 3-1/8" 5M w/ 3-1/8” 5M Cameron Wing
Wellhead FMC 11” 5K x sliplock bottom w/ (2) 2-1/16” 5K outs
GENERAL WELL INFO
API: 50-029-23805-00-00
Completion Date: 11/29/2024
JEWELRY DETAIL
No. MD Item ID
1 ±XXX’ GLM 3-1/2” x 1” with DPSOV Installed 2.992”
2 ±X,XXX’ GLM 3-1/2” x 1” with DV Installed 2.992”
3 ±X,XXX’ XN Nipple 2.813” with 2.75” No Go 2.750“
4 ±X,XXX’ Pressure Discharge Sub:
5 ±X,XXX’ Discharge Head:
6 ±X,XXX’ Pump #2:
7 ±X,XXX’ Pump #1:
8 ±X,XXX’ Gas Separator:
9 ±X,XXX’ Upper Tandem Seal:
10 ±X,XXX’ Lower Tandem Seal:
11 ±X,XXX’ Motor:
12 ±X,XXX’ Motor Gauge:
13 ±X,XXX’ Centralizer: Anode –Btm @ ±X,XXX’
14 5,039’ SLZXP LTP (11.28’ Tieback Sleeve) 6.180”
15 6,248’ 5-1/2” x 4-1/2” XO 3.920”
16 16,878’ Shoe
5-1/2” x 4-1/2”SCREENS LINER DETAIL
Size Top
(MD)
Top
(TVD)
Btm
(MD)
Btm
(TVD)
5-1/2” 5278’ 3972’ 6248’ 4010’
4-1/2” 6250’ 4010’ 16216’ 4294’
Milne Point
ASR Rig 1 BOPE
2023
11” BOPE
4.48'
4.54'
2.00'
CIW-U
4.30'
Hydril GK
11" - 5000
VBR or Pipe Rams
Blind11'’- 5000
DSA, 11 5M X 7 1/16 5M (If Needed)
2 1/16 5M Kill Line Valves 2 1/16 5M Choke Line Valves
HCRManualManualHCR
Stripping Head
2-7/8” x 5” VBR
David Douglas Hilcorp Alaska, LLC
Sr. Geotechnician 3800 Centerpoint Drive, Suite 1400
Anchorage, AK 99503
Tele: (907) 777-8337
E-mail: david.douglas@hilcorp.com
Please acknowledge receipt by signing and returning one copy of this transmittal.
Received By: Date:
Date: 12/19/2024
To: Alaska Oil & Gas Conservation Commission
Natural Resource Technician
333 W 7th Ave Suite 100
Anchorage, AK 99501
DATA TRANSMITTAL:
WELL: MPU J-46
PTD: 224-131
API: 50-029-23805-00-00
FINAL LWD FORMATION EVALUATION + GEOSTEERING (11/10/2024 to 11/28/2024)
x ROP, AGR, ABG, DGR, EWR-M5, ADR, Horizontal Presentation (2” & 5” MD/TVD Color Logs)
x Final Definitive Directional Survey
x Final Geosteering and EOW Report/Plots
SFTP Transfer – Main Folders:
FINAL LWD Subfolders:
FINAL Geosteering Subfolders:
Please include current contact information if different from above.
224-131
T39890
Gavin Gluyas Digitally signed by Gavin Gluyas
Date: 2024.12.19 11:32:10 -09'00'
By James Brooks at 3:16 pm, Dec 17, 2024
Completed
11/29/2024
JSB
RBDMS JSB 123124
GSFD 2/4/2025MGR03OCT2025 DSR-4/7/25
Digitally signed by Sean
McLaughlin (4311)
DN: cn=Sean McLaughlin (4311)
Date: 2024.12.17 11:42:31 -
09'00'
Sean
McLaughlin
(4311)
Digitally signed by Taylor
Wellman (2143)
DN: cn=Taylor Wellman (2143)
Date: 2024.12.17 14:23:29 -
09'00'
Taylor Wellman
(2143)
_____________________________________________________________________________________
Edited By: JNL 12/10/2024
SCHEMATIC
Milne Point Unit
Well: MPU J-46
Last Completed: 11/29/2024
PTD: 224-131
TD =16,255’(MD) / TD =4,294’(TVD)
20”
Orig. KB Elev.: 66.23’ / GL Elev.: 32.6’
7”
15
9-5/8”
1
2
3
5-1/2” XO
4-1/2”
@7,000’
See
Screen/
Solid
Liner
Detail
PBTD = 16,254’(MD) / PBTD = 4,294’(TVD)
9-5/8”
Fidelis
Cementer
@ 2,144’
14
16
3-1/2”
4,5&6
7
8&9
12&13
10&11
CASING DETAIL
Size Type Wt/ Grade/ Conn ID Top Btm BPF
20" Conductor 129.5 / X52 / Weld N/A Surface 167’ N/A
9-5/8" Surface 47 / L-80 / TXP 8.681 Surface 2,156’ 0.0732
9-5/8” Surface 40 / L-80 / TXP 8.835 2,156’ 5,248’ 0.0758
7” Tieback 26 / L-80 / TXP 6.276 Surface 5,052’ 0.0459
5-1/2” Liner 250ђ Screens 20 / L-80 / EZGO HT 4.780 5,039’ 6,248’ 0.0222
4-1/2” Liner 250ђ Screens 13.5 / L-80 / Hyd 625 3.920 6,248’ 16,255’ 0.0149
TUBING DETAIL
3-1/2" Tubing 9.3# / L-80 / TXP 2.992 Surface 4,759’ 0.087
OPEN HOLE / CEMENT DETAIL
24” x Driven 9 yds Concrete
12-1/4"Stg 1 Lead – 365 sx / Tail – 400 sx
Stg 2 Lead – 870 sx / Tail 270 sx
8-1/2” Cementless Screened Liner
WELL INCLINATION DETAIL
KOP @ 480’
90° Hole Angle = @ 8,100’
TREE & WELLHEAD
Tree Cameron 3-1/8" 5M w/ 3-1/8” 5M Cameron Wing
Wellhead FMC 11” 5K x sliplock bottom w/ (2) 2-1/16” 5K outs
GENERAL WELL INFO
API: 50-029-23805-00-00
Completion Date: 11/29/2024
JEWELRY DETAIL
No. MD Item ID
1 103’ GLM 3-1/2” x 1” with DPSOV Installed 2.992”
2 4,198’ GLM 3-1/2” x 1” with DV Installed 2.992”
3 4,253’ XN Nipple 2.813” with 2.75” No Go 2.750“
4 4,665’ Pressure Discharge Sub: Vigilant Sensor
5 4,666’ Discharge Head
6 4,667’ Pump #2 Summit 400
7 4,689’ Pump #1 Summit 400
8 4,711’ Gas Separator
9 4,712’ Upper Tandem Seal
10 4,720’ Lower Tandem Seal
11 4,728’ Motor: Summit 456, 240 HP / 3040 V / 56 A
12 4,754’ Motor Gauge: 8 KPSI, 2xPres, 2xTemp, 2xVib
13 4,757’ Centralizer: Anode
14 5,039’ SLZXP LTP (11.28’ Tieback Sleeve) 6.180”
15 6,248’ 5-1/2” x 4-1/2” XO 3.920”
16 16,878’ Shoe
5-1/2” x 4-1/2”SCREENS LINER DETAIL
Size Top
(MD)
Top
(TVD)
Btm
(MD)
Btm
(TVD)
5-1/2” 5278’ 3972’ 6248’ 4010’
4-1/2” 6250’ 4010’ 16216’ 4294’
Alaska Oil and Gas
Conservation Commission
333 West Seventh Avenue
Anchorage, Alaska 99501-3572
Main: 907.279.1433
Fax: 907.276.7542
www.aogcc.alaska.gov
Monty M. Myers
Drilling Manager
Hilcorp Alaska, LLC
3800 Centerpoint Drive, Suite 1400
Anchorage, AK, 99503
Re: Milne Point Field, Schrader Bluff Oil Pool, MPU J-46
Hilcorp Alaska, LLC
Permit to Drill Number: 224-131
Surface Location: 2361' FSL, 3196' FEL, Sec 28, T13N, R10E, UM, AK
Bottomhole Location: 1061' FNL, 11434' FEL, Sec 35, T13N, R10E, UM, AK
Dear Mr. Myers:
Enclosed is the approved application for the permit to drill the above referenced well.
Per Statute AS 31.05.030(d)(2)(B) and Regulation 20 AAC 25.071, composite curves for all well
logs run must be submitted to the AOGCC within 90 days after completion, suspension, or
abandonment of this well, or within 90 days of acquisition of the data, whichever occurs first.
This permit to drill does not exempt you from obtaining additional permits or an approval required
by law from other governmental agencies and does not authorize conducting drilling operations
until all other required permits and approvals have been issued. In addition, the AOGCC reserves
the right to withdraw the permit in the event it was erroneously issued.
Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska
Administrative Code unless the AOGCC specifically authorizes a variance. Failure to comply
with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code,
or an AOGCC order, or the terms and conditions of this permit may result in the revocation or
suspension of the permit.
Sincerely,
Jessie L. Chmielowski
Commissioner
DATED this 25th day of October 2024.
Jessie L.
Chmielowski
Digitally signed by
Jessie L. Chmielowski
Date: 2024.10.25
09:27:29 -08'00'
5-1/2"x4-1/2"EZGOHT/Hyd625
MILNE POINT FIELD
SCHRADER BLUFF OIL POOL
Digitally signed by Sean
McLaughlin (4311)
DN: cn=Sean McLaughlin (4311)
Date: 2024.10.10 16:00:51 -
08'00'
Sean
McLaughlin
(4311)
By Grace Christianson at 8:27 am, Oct 11, 2024
A.Dewhurst 24OCT24MGR24OCT2024 DSR-10/14/24
224-131
* BOPE test to 3000 psi. Annular to 2500 psi.
* Casing test and FIT digital data to be emailed to AOGCC immediately
upon completion of FIT.
395 sx
50-029-23805-00-00
*&:
Jessie L. Chmielowski Digitally signed by Jessie L. Chmielowski
Date: 2024.10.25 09:27:42 -08'00'10/25/24
10/25/24
RBDMS JSB 102924
Milne Point Unit
(MPU) J-46
Drilling Program
Version 1
10/9/2024
Table of Contents
1.0 Well Summary ........................................................................................................................... 2
2.0 Management of Change Information ........................................................................................ 3
3.0 Tubular Program:...................................................................................................................... 4
4.0 Drill Pipe Information: .............................................................................................................. 4
5.0 Internal Reporting Requirements ............................................................................................. 5
6.0 Planned Wellbore Schematic ..................................................................................................... 6
7.0 Drilling / Completion Summary ................................................................................................ 7
8.0 Mandatory Regulatory Compliance / Notifications .................................................................. 8
9.0 R/U and Preparatory Work ..................................................................................................... 10
10.0 N/U 13-5/8” 5M Diverter System ............................................................................................. 11
11.0 Drill 12-1/4” Hole Section ........................................................................................................ 13
12.0 Run 9-5/8” Surface Casing ...................................................................................................... 16
13.0 Cement 9-5/8” Surface Casing ................................................................................................. 22
14.0 ND Diverter, NU BOPE, & Test .............................................................................................. 27
15.0 Drill 8-1/2” Hole Section .......................................................................................................... 28
16.0 Run 5-1/2” x 4-1/2” Screened Liner ........................................................................................ 33
17.0 Run 7” Tieback ........................................................................................................................ 38
18.0 Run Upper Completion – ESP ................................................................................................. 41
19.0 Doyon 14 Diverter Schematic .................................................................................................. 44
20.0 Doyon 14 BOP Schematic ........................................................................................................ 45
21.0 Wellhead Schematic ................................................................................................................. 46
22.0 Days Vs Depth .......................................................................................................................... 47
23.0 Formation Tops & Information............................................................................................... 48
24.0 Anticipated Drilling Hazards .................................................................................................. 49
25.0 Doyon 14 Rig Layout ............................................................................................................... 51
26.0 FIT Procedure .......................................................................................................................... 53
27.0 Doyon 14 Rig Choke Manifold Schematic ............................................................................... 54
28.0 Casing Design ........................................................................................................................... 55
29.0 8-1/2” Hole Section MASP ....................................................................................................... 56
30.0 Spider Plot (NAD 27) (Governmental Sections) ...................................................................... 57
31.0 Surface Plat (As Built) (NAD 27) ............................................................................................. 58
Page 2
Milne Point Unit
J-46 SB Producer
PTD Application
1.0 Well Summary
Well MPU J-46
Pad Milne Point “J” Pad
Planned Completion Type ESP
Target Reservoir(s) Schrader Bluff NB Sand
Planned Well TD, MD / TVD 16,878’ MD / 4,240’ TVD
PBTD, MD / TVD 16,878 MD / 4,240’ TVD
Surface Location (Governmental) 2361' FSL, 3196' FEL, Sec 28, T13N, R10E, UM, AK
Surface Location (NAD 27) X= 552124, Y=6014759
Top of Productive Horizon
(Governmental)1595' FSL, 1893' FEL, Sec 28, T13N, R10E, UM, AK
TPH Location (NAD 27) X= 553434, Y= 6014002
BHL (Governmental) 1061' FNL, 1434' FEL, Sec 35, T13N, R10E, UM, AK
BHL (NAD 27) X= 564477, Y= 6011434
AFE Drilling Days 19
AFE Completion Days 3
Maximum Anticipated Pressure
(Surface) 1345 psig
Maximum Anticipated Pressure
(Downhole/Reservoir) 1741 psig
Work String 5” 19.5# S-135 NC 50
Doyon 14 KB Elevation above MSL: 32.6 ft + 33.5 ft = 66.1 ft
GL Elevation above MSL: 32.6 ft
BOP Equipment 13-5/8” x 5M Annular, (3) ea 13-5/8” x 5M Rams
Page 3
Milne Point Unit
J-46 SB Producer
PTD Application
2.0 Management of Change Information
Page 4
Milne Point Unit
J-46 SB Producer
PTD Application
3.0 Tubular Program:
Hole
Section
OD (in)ID
(in)
Drift
(in)
Conn OD
(in)
Wt
(#/ft)
Grade Conn Burst
(psi)
Collapse
(psi)
Tension
(k-lbs)
Cond 20” 19.25”---X-52Weld
12-1/4”9-5/8” 8.835” 8.679”10.625”40 L-80 TXP 5,750 3,090 916
9-5/8” 8.681” 8.525” 10.625” 47 L-80 TXP 6,870 4,750 1,086
Tieback 7” 6.276” 6.151” 7.656” 26 L-80 TXP 7,240 5,410 604
8-1/2”5-1/2”
Screens 4.780” 4.653” 6.000” 20 L-80 EZGO HT 9,189 8,830 466
8-1/2”4-1/2”
Screens 3.920” 3.795” 4.714” 13.5 L-80 Hydril 625 9,020 8,540 279
Tubing 3-1/2” 2.992” 2.867” 4.500” 9.3 L-80
EUE 8RD 9289 7399 163
4.0 Drill Pipe Information:
Hole
Section
OD
(in)
ID (in)TJ ID
(in)
TJ OD
(in)
Wt
(#/ft)
Grade Conn M/U
(Min)
M/U
(Max)
Tension
(k-lbs)
Surface &
Production
5”4.276” 3.25” 6.625” 19.5 S-135 DS50 36,100 43,100 560klb
5”4.276” 3.25” 6.625” 19.5 S-135 NC50 30,730 34,136 560klb
All casing will be new, PSL 1 (100% mill inspected, 10% inspection upon delivery).
Page 5
Milne Point Unit
J-46 SB Producer
PTD Application
5.0 Internal Reporting Requirements
5.1 Fill out daily drilling report and cost report on WellEz.
x Report covers operations from 6am to 6am
x Click on one of the tabs at the top to save data entered. If you click on one of the tabs to the left
of the data entry area – this will not save the data entered, and will navigate to another data entry.
x Ensure time entry adds up to 24 hours total.
x Try to capture any out of scope work as NPT. This helps later on when we pull end of well
reports.
x Enter the MD and TVD depths EVERY DAY whether you are making hole or not.
5.2 Afternoon Updates
x Submit a short operations update each work day to mmyers@hilcorp,
nathan.sperry@hilcorp.com and joseph.lastufka@hilcorp.com
5.3 Intranet Home Page Morning Update
x Submit a short operations update each morning by 7am on the company intranet homepage. On
weekend and holidays, ensure to have this update in before 5am.
5.4 EHS Incident Reporting
x Health and Safety: Notify EHS field coordinator.
x Environmental: Drilling Environmental Coordinator
x Notify Drilling Manager & Drilling Engineer on all incidents
x Submit Hilcorp Incident report to contacts above within 24 hrs
5.5 Casing Tally
x Send final “As-Run” Casing tally to nathan.sperry@hilcorp.com and
joseph.lastufka@hilcorp.com
5.6 Casing and Cement report
x Send casing and cement report for each string of casing to nathan.sperry@hilcorp.com and
joseph.lastufka@hilcorp.com
5.7 Hilcorp Milne Point Contact List:
Title Name Work Phone Cell Phone Email
Drilling Manager Sean Mclaughlin 907.223.6784 sean.mclaughlin@hilcorp.com
Drilling Engineer Nate Sperry 907.777.8450 907.301.8996 nathan.sperry@hilcorp.com
Drilling Engineer Joe Engel 907.777.8395 805.235.6265 jengel@hilcorp.com
Completion Engineer Todd Sidoti 907.632.4113 Todd.sidoti@hilcorp.com
Geologist Katie Cunha 907.564.4786 907.802.0078 Katharine.cunha@hilcorp.com
Reservoir Engineer Almas Aitkulov 907.564.4250 979.739.3133 aaitkulov@hilcorp.com
Drilling Env. Coordinator Adrian Kersten adrian.kersten@hilcorp.com
Drilling Tech Joe Lastufka 907.777.8400 907.227.8496 Joseph.Lastufka@hilcorp.com
_____________________________________________________________________________________
Edited By: JNL 10/8/2024
PROPOSED SCHEMATIC
Milne Point Unit
Well: MPU J-46
Last Completed: TBD
PTD: TBD
TD =16,878’(MD) / TD =4,240’(TVD)
20”
Orig. KB Elev.: 66.3’ / GL Elev.: 32.6’
7”
13
9-5/8”
1
2
3
5-1/2” XO
4-1/2”
@7,000’
See
Screen/
Solid
Liner
Detail
PBTD = 16,878’(MD) / PBTD = 4,240’(TVD)
9-5/8” ‘ES’
Cementer
@ ~2,500’
12
14
3-1/2”
4&5
6&7
8
10&11
9
CASING DETAIL
Size Type Wt/ Grade/ Conn ID Top Btm BPF
20" Conductor 129.5 / X52 / Weld N/A Surface 165’ N/A
9-5/8" Surface 47 / L-80 / TXP 8.681 Surface 2,500’ 0.0732
9-5/8” Surface 40 / L-80 / TXP 8.835 2,500’ 5,100’ 0.0758
7” Tieback 26 / L-80 / TXP 6.276 Surface 4,950’ 0.0459
5-1/2” Liner 100ђ Screens 20 / L-80 / EZGO HT 4.778 4,950’ 7,000’ 0.0222
4-1/2” Liner 100ђ Screens 13.5 / L-80 / Hyd 625 3.920 7,000’ 16,878’ 0.0149
TUBING DETAIL
3-1/2" Tubing 9.3# / L-80 / TXP 2.992 Surface 4,930’ 0.087
OPEN HOLE / CEMENT DETAIL
24” x Driven 9 yds Concrete
12-1/4"Stg 1 Lead – 277 sx / Tail – 385 sx
Stg 2 Lead – 673 sx / Tail 268 sx
8-1/2” Cementless Screened Liner
WELL INCLINATION DETAIL
KOP @ 480’
90° Hole Angle = @ 8,100’
TREE & WELLHEAD
Tree Cameron 3-1/8" 5M w/ 3-1/8” 5M Cameron Wing
Wellhead FMC 11” 5K x sliplock bottom w/ (2) 2-1/16” 5K outs
GENERAL WELL INFO
API: TBD
Completion Date: TBD
JEWELRY DETAIL
No. MD Item ID
1 ~107’ GLM 3-1/2” x 1” with OV Installed 2.992”
2 ~4,050’ GLM 3-1/2” x 1” with DV Installed 2.992”
3 ~4,100’ XN Nipple 2.813” with 2.75” No Go 2.750“
4 ~4,840’ Discharge Head
5 ~4,860’ Pump
7 ~4,880’ Gas Separator
8 ~4,885’ Upper Tandem Seal
9 ~4,895’ Lower Tandem Seal
10 ~4,905’ Motor
11 ~4,925’ Baker Zenith Motor Gauge w/ Centralizer
12 ~4,950’ SLZXP LTP (11.29’ Tieback Sleeve) 6.170”
13 ~7,000’ 5-1/2” x 4-1/2” XO 3.910”
14 16,878’ Shoe
5-1/2” x 4-1/2”SCREENS LINER DETAIL
Size Top
(MD)
Top
(TVD)
Btm
(MD)
Btm
(TVD)
5-1/2”
4-1/2”
Page 7
Milne Point Unit
J-46 SB Producer
PTD Application
7.0 Drilling / Completion Summary
MPU J-46 is a grassroots producer planned to be drilled in the Schrader Bluff NB sand. J-46 is part of a
multi well program targeting the Schrader Bluff sand on J-pad
The directional plan is 12-1/4” surface hole with 9-5/8” surface casing set in the top of the Schrader Bluff
NB sand. An 8-1/2” lateral section will be drilled and completed with a 5-1/2” x 4-1/2” liner. The well will
be produced with an ESP.
Doyon 14 will be used to drill and complete the wellbore.
Drilling operations are expected to commence approximately November 10, 2024, pending rig schedule.
Surface casing will be run to 5,100’ MD / 3,956’ TVD and cemented to surface via a 2-stage primary cement
job. Cement returns to surface will confirm TOC at surface. If cement returns to surface are not observed,
necessary remedial action will then be discussed with AOGCC authorities.
All cuttings & mud generated during drilling operations will be hauled to the Milne Point “B” pad G&I facility.
General sequence of operations:
1. MIRU Doyon 14 to well site
2. N/U & Test 21-1/4” Diverter and 16” diverter line
3. Drill 12-1/4” hole to TD of surface hole section. Run and cement 9-5/8” surface casing
4. N/D diverter, N/U wellhead, NU 13-5/8” 5M BOP & Test
5. Drill 8-1/2” lateral to well TD
6. Run 5-1/2” x 4-1/2” production liner
7. Run 7” tieback
8. Run Upper Completion
9. N/D BOP, N/U Tree, RDMO
Reservoir Evaluation Plan:
1. Surface hole: No mud logging. Remote geologist. LWD: GR + Res
2. Production Hole: No mud logging. Remote geologist. LWD: GR + ADR (For geo-steering)
Page 8
Milne Point Unit
J-46 SB Producer
PTD Application
8.0 Mandatory Regulatory Compliance / Notifications
Regulatory Compliance
Ensure that all drilling and completion operations comply with all applicable AOGCC regulations.
Operations stated in this PTD application may be altered based on sound engineering judgement as
wellbore conditions require, but no AOGCC regulations will be varied from without prior approval from
the AOGCC. If additional clarity or guidance is required on how to comply with a specific regulation,
do not hesitate to contact the Anchorage Drilling Team.
x Review all conditions of approval of the PTD on the 10-401 form. Ensure that the conditions of
approval are captured in shift handover notes until they are executed and complied with.
x BOPs shall be tested at (2) week intervals during the drilling and completion of MPU J-46. Ensure
to provide AOGCC 24 hrs notice prior to testing BOPs.
x The initial test of BOP equipment will be to 250/3,000 psi & subsequent tests of the BOP equipment
will be to 250/3,000 psi for 5/5 min (annular to 50% rated WP, 2,500 psi on the high test for initial
and subsequent tests).Confirm that these test pressures match those specified on the APD.
x If the BOP is used to shut in on the well in a well control situation or control fluid flow from the
well bore, AOGCC is to be notified and we must test all BOP components utilized for well control
prior to the next trip into the wellbore. This pressure test will be charted same as the 14-day BOP
test.
x All AOGCC regulations within 20 AAC 25.033 “Primary well control for drilling: drilling fluid
program and drilling fluid system”.
x All AOGCC regulations within 20 AAC 25.035 “Secondary well control for primary drilling and
completion: blowout prevention equipment and diverter requirements”.
o Ensure the diverter vent line is at least 75’ away from potential ignition sources
x Ensure AOGCC approved drilling permit is posted on the rig floor and in Co Man office.
x Casing pressure test criteria in 20 AAC 25.030 (e) Casing and Cementing,“A casing pressure test
must be performed if BOPE is to be installed on a casing. The casing must be tested to hold a
minimum surface pressure equal to 50 percent of the casing internal yield pressure. The test
pressure must show stabilizing pressure and may not decline more than 10 percent within 30
minutes. The results of this test and any subsequent tests of the casing must be recorded as required
by 20 AAC 25.070(1)”.
AOGCC Regulation Variance Requests:
x None
Page 9
Milne Point Unit
J-46 SB Producer
PTD Application
Summary of BOP Equipment & Notifications
Hole Section Equipment Test Pressure (psi)
12 1/4”x 21-1/4” 2M Diverter w/ 16” Diverter Line Function Test Only
8-1/2”
x 13-5/8” x 5M Hydril “GK” Annular BOP
x 13-5/8” x 5M Hydril MPL Double Gate
o Blind ram in btm cavity
x Mud cross w/ 3” x 5M side outlets
x 13-5/8” x 5M Hydril MPL Single ram
x 3-1/8” x 5M Choke Line
x 3-1/8” x 5M Kill line
x 3-1/8” x 5M Choke manifold
x Standpipe, floor valves, etc
Initial Test: 250/3000
Subsequent Tests:
250/3000
Primary closing unit: NL Shaffer, 6 station, 3000 psi, 180 gallon accumulator unit.
Primary closing hydraulics is provided by an electrically driven triplex pump. Secondary back-up is a 30:1 air
pump, and emergency pressure is provided by bottled nitrogen.
The remote closing operator panels are located in the doghouse and on accumulator unit.
Required AOGCC Notifications:
x Well control event (BOPs utilized to shut in the well to control influx of formation fluids).
x 24 hours notice prior to spud.
x 24 hours notice prior to testing BOPs.
x 24 hours notice prior to casing running & cement operations.
x Any other notifications required in APD.
Regulatory Contact Information:
AOGCC
Jim Regg / AOGCC Inspector / (O): 907-793-1236 / Email:jim.regg@alaska.gov
Victoria Loepp / Petroleum Engineer / (O): 907-793-1247 / Email:Victoria.loepp@alaska.gov
Mel Rixse / Petroleum Engineer / (O): 907-793-1231 / (C): 907-223-3605 / Email:melvin.rixse@alaska.gov
Primary Contact for Opportunity to witness:AOGCC.Inspectors@alaska.gov
Test Inspection notification standardization format:http://doa.alaska.gov/ogc/forms/TestWitnessNotif.html
Notification / Emergency Phone: 907-793-1236 (During normal Business Hours)
Notification / Emergency Phone: 907-659-2714 (Outside normal Business Hours)
Page 10
Milne Point Unit
J-46 SB Producer
PTD Application
9.0 R/U and Preparatory Work
9.1 J-46 will utilize a newly set 20” conductor on J-pad. Ensure to review attached surface plat and
make sure rig is over appropriate conductor.
9.2 Ensure PTD and drilling program are posted in the rig office and on the rig floor.
9.3 Install landing ring.
9.4 Insure (2) 4” nipples are installed on opposite sides of the conductor with ball valves on each.
9.5 Level pad and ensure enough room for layout of rig footprint and R/U.
9.6 Rig mat footprint of rig.
9.7 MIRU Doyon 14. Ensure rig is centered over conductor to prevent any wear to BOPE or
wellhead.
9.8 Mud loggers WILL NOT be used on either hole section.
9.9 Mix spud mud for 12-1/4” surface hole section. Ensure mud temperatures are cool (<80qF).
9.10 Ensure 6” liners in mud pumps.
x Continental EMSCO FB-1600 mud pumps are rated at 4665 psi, 462 gpm @ 110 spm @
95% volumetric efficiency.
Page 11
Milne Point Unit
J-46 SB Producer
PTD Application
10.0 N/U 21-1/4” 5M Diverter System
10.1 N/U 21-1/4” Hydril MSP 2M Diverter System (Diverter Schematic attached to program).
x N/U 16-3/4” 3M x 21-1/4” 2M DSA on 16-3/4” 3M wellhead.
x N/U 21-1/4” diverter “T”.
x Knife gate, 16” diverter line.
x Ensure diverter R/U complies with AOGCC reg 20.AAC.25.035(C).
x Diverter line must be 75 ft from nearest ignition source
x Place drip berm at the end of diverter line.
10.2 Notify AOGCC. Function test diverter.
x Ensure that the knife gate and annular are operated on the same circuit so that knife gate opens
prior to annular closure.
x Ensure that the annular closes in less than 45 seconds (API Standard 64 3rd edition March 2018
section 12.6.2 for packing element ID greater than 20”)
10.3 Ensure to set up a clearly marked “warning zone” is established on each side and ahead of the
vent line tip. “Warning Zone” must include:
x A prohibition on vehicle parking
x A prohibition on ignition sources or running equipment
x A prohibition on staged equipment or materials
x Restriction of traffic to essential foot or vehicle traffic only.
Page 12
Milne Point Unit
J-46 SB Producer
PTD Application
10.4 Rig & Diverter Orientation:
x May change on location
Page 13
Milne Point Unit
J-46 SB Producer
PTD Application
11.0 Drill 12-1/4” Hole Section
11.1 P/U 12-1/4” directional drilling assembly:
x Ensure BHA components have been inspected previously.
x Drift and caliper all components before M/U. Visually verify no debris inside components
that cannot be drifted.
x Ensure TF offset is measured accurately and entered correctly into the MWD software.
x Use GWD until MWD surveys are clean and then swap to MWD.
x Have DD run hydraulics calculations on site to ensure optimum nozzle sizing.
x Drill string will be 5” 19.5# S-135.
x Run a solid float in the surface hole section.
11.2 Begin drilling out from 20” conductor at reduced flow rates to avoid broaching the conductor.
x Consider using a trash bit to clean out conductor to mitigate potential damage from debris in
conductor.
11.3 Drill 12-1/4” hole section to section TD in the Schrader NB sand. Confirm this setting depth with
the Geologist and Drilling Engineer while drilling the well.
x Monitor the area around the conductor for any signs of broaching. If broaching is observed,
stop drilling (or circulating) immediately notify Drilling Engineer.
x Efforts should be made to minimize dog legs in the surface hole. Keep DLS < 6 deg / 100.
x Hold a safety meeting with rig crews to discuss:
x Conductor broaching ops and mitigation procedures.
x Well control procedures and rig evacuation
x Flow rates, hole cleaning, mud cooling, etc.
x Pump sweeps and maintain mud rheology to ensure effective hole cleaning.
x Keep mud as cool as possible to keep from washing out permafrost.
x Pump at 400-600 gpm. Monitor shakers closely to ensure shaker screens and return lines can
handle the flow rate.
x Ensure to not out drill hole cleaning capacity, perform clean up cycles or reduce ROP if
packoffs, increase in pump pressure or changes in hookload are seen
x Slow in/out of slips and while tripping to keep swab and surge pressures low
x Ensure shakers are functioning properly. Check for holes in screens on connections.
x Have the flowline jets hooked up and be ready to jet the flowline at the first sign of pea
gravel, clay balling or packing off.
x Adjust MW and viscosity as necessary to maintain hole stability, ensure MW is at a 9.2
minimum at TD (pending MW increase due to hydrates).
x Perform gyros until clean MWD surveys are seen. Take MWD surveys every stand drilled.
x Be prepared for gas hydrates. In MPU they have been encountered typically around 2,100-
2,400’ TVD (just below permafrost). Be prepared for hydrates:
x Gas hydrates can be identified by the gas detector and a decrease in MW or ECD
x Monitor returns for hydrates, checking pressurized & non-pressurized scales
Page 14
Milne Point Unit
J-46 SB Producer
PTD Application
x Do not stop to circulate out gas hydrates – this will only exacerbate the problem by
washing out additional permafrost. Attempt to control drill (150 fph MAX) through the
zone completely and efficiently to mitigate the hydrate issue. Flowrates can also be
reduced to prevent mud from belching over the bell nipple.
x Gas hydrates are not a gas sand, once a hydrate is disturbed the gas will come out of the well.
MW will not control gas hydrates, but will affect how gas breaks out at surface.
x Take MWD and GWD surveys every stand until magnetic interference cleans up. After
MWD surveys show clean magnetics, only take MWD surveys.
x Surface Hole AC:
x There are no wells with a clearance factor of <1.0
11.4 12-1/4” hole mud program summary:
Density: Weighting material to be used for the hole section will be barite. Additional barite or spike fluid
will be on location to weight up the active system (1) ppg above highest anticipated MW. We will start with
a simple gel + FW spud mud at 8.8 ppg and TD with 9.2+ ppg.
Depth Interval MW (ppg)
Surface –Base Permafrost 8.9+
Base Permafrost - TD 9.2+
MW can be cut once ~500’ below hydrate zone
PVT System: MD Totco PVT will be used throughout the drilling and completion phase. Remote
monitoring stations will be available at the driller’s console, Co Man office, Toolpusher office, and mud
loggers office.
Rheology: Aquagel and Barazan D+ should be used to maintain rheology. Begin system with a 75 YP but
reduce this once clays are encountered. Maintain a minimum 25 YP at all times while drilling. Be prepared
to increase the YP if hole cleaning becomes an issue.
Fluid Loss: DEXTRID and/or PAC L should be used for filtrate control. Background LCM (10 ppb total)
can be used in the system while drilling the surface interval to prevent losses and strengthen the wellbore.
Wellbore and mud stability:Additions of CON DET PRE-MIX/DRIL N SLIDE are recommended to
reduce the incidence of bit balling and shaker blinding when penetrating the high-clay content sections of
the Sagavanirktok and the heavy oil sections of the UGNU 4A. Maintain the pH in the 8.5 – 9.0 range with
caustic soda. Daily additions of ALDACIDE G / X-CIDE 207 MUST be made to control bacterial action.
Casing Running:Reduce system YP with DESCO as required for running casing as allowed (do not
jeopardize hole conditions). Run casing carefully to minimize surge and swab pressures. Reduce the
system rheology once the casing is landed to a YP < 20 (check with the cementers to see what YP value
they have targeted).
System Type:8.8 – 9.2 ppg Pre-Hydrated Aquagel/freshwater spud mud
Page 15
Milne Point Unit
J-46 SB Producer
PTD Application
Properties:
Section Density Viscosity Plastic
Viscosity Yield Point API FL pH
Temp
Surface 8.8 –9.8 75-175 20 - 40 25-45 <10 8.5 –9.0 70 F
System Formulation: Gel + FW spud mud
Product- Surface hole Size Pkg ppb or (% liquids)
M-I Gel 50 lb sx 25
Soda Ash 50 lb sx 0.25
PolyPac Supreme UL 50 lb sx 0.08
Caustic Soda 50 lb sx 0.1
SCREENCLEEN 55 gal dm 0.5
11.5 At TD, PU 2-3 stands off bottom to avoid washing out the hole at TD, CBU, pump tandem
sweeps and drop viscosity.
11.6 RIH to bottom, proceed to BROOH to HWDP
x Pump at full drill rate (400-600 gpm) and maximize rotation.
x Pull slowly, 5 – 10 ft / minute, adjust as dictated by hole conditions
x Monitor well for any signs of packing off or losses.
x Have the flowline jets hooked up and be ready to jet the flowline at the first sign of clay
balling.
x If flow rates are reduced to combat overloaded shakers/flowline, stop back reaming until
parameters are restored.
11.7 TOOH and LD BHA
11.8 No open hole logging program planned.
Page 16
Milne Point Unit
J-46 SB Producer
PTD Application
12.0 Run 9-5/8” Surface Casing
12.1 R/U and pull wearbushing.
12.2 R/U 9-5/8” casing running equipment (CRT & Tongs)
x Ensure 9-5/8” TXP x NC50 XO on rig floor and M/U to FOSV.
x Use BOL 2000 thread compound. Dope pin end only w/ paint brush.
x R/U of CRT if hole conditions require.
x R/U a fill up tool to fill casing while running if the CRT is not used.
x Ensure all casing has been drifted to 8.5” on the location prior to running.
x Note that 47# drift is 8.525”
x Be sure to count the total # of joints on the location before running.
x Keep hole covered while R/U casing tools.
x Record OD’s, ID’s, lengths, S/N’s of all components w/ vendor & model info.
12.3 P/U shoe joint, visually verify no debris inside joint.
12.4 Continue M/U & thread locking 120’ shoe track assembly consisting of:
9-5/8” Float Shoe
1 joint – 9-5/8” TXP, 2 Centralizers 10’ from each end w/ stop rings
1 joint –9-5/8” TXP, 1 Centralizer mid joint w/ stop ring
9-5/8” Float Collar w/ Stage Cementer Bypass Baffle ‘Top Hat’
1 joint –9-5/8” TXP, 1 Centralizer mid joint with stop ring
9-5/8” HES Baffle Adaptor
x Ensure bypass baffle is correctly installed on top of float collar.
x Ensure proper operation of float equipment while picking up.
x Ensure to record S/N’s of all float equipment and stage tool components.
This end up.
Bypass Baffle
Page 17
Milne Point Unit
J-46 SB Producer
PTD Application
12.5 Float equipment and Stage tool equipment drawings:
Page 18
Milne Point Unit
J-46 SB Producer
PTD Application
12.6 Continue running 9-5/8” surface casing
x Fill casing while running using fill up line on rig floor.
x Use BOL 2000 thread compound. Dope pin end only w/ paint brush.
x Centralization:
x 1 centralizer every joint to ~ 1000’ MD from shoe
x 1 centralizer every 2 joints to ~2,000’ above shoe (Top of Lowest Ugnu)
x Verify depth of lowest Ugnu water sand for isolation with Geologist
x Utilize a collar clamp until weight is sufficient to keep slips set properly.
x Break circulation prior to reaching the base of the permafrost if casing run indicates poor
hole conditions.
x Any packing off while running casing should be treated as a major problem. It is preferable
to POH with casing and condition hole than to risk not getting cement returns to surface.
x If we experienced losses while BROOH, or if the mud returns are coming back thick,
break circulation more frequently and plan to CBU multiple times prior to reaching
TD. Confirm circ strategy with drilling engineer.
12.7 Install the Halliburton Type H ES-II Stage tool so that it is positioned at least 100’ TVD below
the permafrost.
x Install centralizers over couplings on 5 joints below and 5 joints above stage tool.
x Do not place tongs on ES cementer, this can cause damaged to the tool.
x Ensure tool is pinned with 6 opening shear pins. This will allow the tool to open at 3300 psi.
9-5/8” 40# L-80 TXP Make-Up Torques:
Casing OD Minimum Optimum Maximum
9-5/8”18,860 ft-lbs 20,960 ft-lbs 23,060 ft-lbs
9-5/8” 47# L-80 TXP MUT:
Casing OD Minimum Optimum Maximum
9-5/8”21,440 ft-lbs 23,820 ft-lbs 26,200 ft-lbs
Page 19
Milne Point Unit
J-46 SB Producer
PTD Application
Page 20
Milne Point Unit
J-46 SB Producer
PTD Application
12.8 Continue running 9-5/8” surface casing
x Centralizers: 1 centralizer every 3rd joint to 200’ from surface
x Fill casing while running using fill up line on rig floor.
x Use BOL 2000 thread compound. Dope pin end only w/ paint brush.
x Centralization:
o 1 centralizer every 2 joints to base of conductor
12.9 Ensure the permafrost is covered with 9-5/8” 47# from BPRF to Surface
x Ensure drifted to 8.525”
Page 21
Milne Point Unit
J-46 SB Producer
PTD Application
12.10 Watch displacement carefully and avoid surging the hole. Slow down running speed if
necessary.
12.11 Slow in and out of slips.
12.12 P/U landing joint and M/U to casing string. Position the casing shoe +/- 10’ from TD. Strap the
landing joint prior to the casing job and mark the joint at (1) ft intervals to use as a reference
when getting the casing on depth.
12.13 Lower casing to setting depth. Confirm measurements.
12.14 Have slips staged in cellar, along with necessary equipment for the operation.
12.15 Circulate and condition mud through CRT. Reduce YP to < 20 to help ensure success of cement
job. Ensure adequate amounts of cold M/U water are available to achieve this. If possible
reciprocate casing string while conditioning mud.
Page 22
Milne Point Unit
J-46 SB Producer
PTD Application
13.0 Cement 9-5/8” Surface Casing
13.1 Hold a pre-job safety meeting over the upcoming cement operations. Make room in pits for
volume gained during cement job. Ensure adequate cement displacement volume available as
well. Ensure mud & water can be delivered to the cementing unit at acceptable rates.
x How to handle cement returns at surface. Ensure vac trucks are on standby and ready to
assist.
x Which pumps will be utilized for displacement, and how fluid will be fed to displacement
pump.
x Ensure adequate amounts of water for mix fluid is heated and available in the water tanks.
x Positions and expectations of personnel involved with the cementing operation.
i. Extra hands in the pits to strap during the cement job to identify any losses
x Review test reports and ensure pump times are acceptable.
x Conduct visual inspection of all hard lines and connections used to route slurry to rig floor.
13.2 Document efficiency of all possible displacement pumps prior to cement job.
13.3 Flush through cement pump and treating iron from pump to rig floor to the shakers. This will
help ensure any debris left in the cement pump or treating iron will not be pumped downhole.
13.4 R/U cement line (if not already done so). Company Rep to witness loading of the top and
bottom plugs to ensure done in correct order.
13.5 Fill surface cement lines with water and pressure test.
13.6 Pump remaining 60 bbls 10.5 ppg tuned spacer.
13.7 Drop bottom plug (flexible bypass plug) – HEC rep to witness. Mix and pump cement per below
calculations for the 1st stage, confirm actual cement volumes with cementer after TD is reached.
13.8 Cement volume based on annular volume + 30% open hole excess. Job will consist of lead &
tail, TOC brought to stage tool.
Estimated 1st Stage Total Cement Volume:
Page 23
Milne Point Unit
J-46 SB Producer
PTD Application
Cement Slurry Design (1st Stage Cement Job):
13.9 Attempt to reciprocate casing during cement pumping if hole conditions allow. Watch
reciprocation PU and SO weights, if the hole gets “sticky”, cease pipe reciprocation and continue
with the cement job.
13.10 After pumping cement, drop top plug (Shutoff plug) and displace cement with spud mud out of
mud pits, spotting water across the HEC stage cementer.
x Ensure volumes pumped and volumes returned are documented and constant communication
between mud pits, HEC Rep and HES Cementers during the entire job.
13.11 Ensure rig pump is used to displace cement. To operate the stage tool hydraulically, the plug
must be bumped.
13.12 Displacement calculation:
See calculation in step 13.8
80 bbls of tuned spacer to be left on top of stage tool so that the first fluid through the ES
cementer is tuned spacer to minimize the risk of flash setting cement
13.13 Monitor returns closely while displacing cement. Adjust pump rate if losses are seen at any
point during the job. Be prepared to pump out fluid from cellar. Have black water available to
contaminate any cement seen at surface.
13.14 If plug is not bumped at calculated strokes, double check volumes and calculations. Over
displace by no more than 50% of shoe track volume, ±4.5 bbls before consulting with Drilling
Engineer. Ensure the free fall stage tool opening plug is available if needed. This is the back-up
option to open the stage tool.
13.15 Bump the plug with 500 psi over displacement pressure. Bleed off pressure and confirm floats
are holding. If floats do not hold, pressure up string to final circulating pressure and hold until
cement is set. Monitor pressure build up and do not let it exceed 500 psi above final circulating
pressure if pressure must be held, this is to ensure the stage tool is not prematurely opened.
13.16 Increase pressure to 3,300 psi to open circulating ports in stage collar. Slightly higher pressure
may be necessary if TOC is above the stage tool. CBU and record any spacer or cement returns
Lead Slurry Tail Slurry
System EconoCem HalCem
Density 12.0 lb/gal 15.8 lb/gal
Yield 2.35 ft3/sk 1.16 ft3/sk
Mix Water 13.92 gal/sk 4.98 gal/sk
Page 24
Milne Point Unit
J-46 SB Producer
PTD Application
to surface and volume pumped to see the returns. Circulate until YP < 20 again in preparation
for the 2nd stage of the cement job.
13.17 Be prepared for cement returns to surface. Dump cement returns in the cellar or open the shaker
bypass line to the cuttings tank. Have black water available and vac trucks ready to assist.
Ensure to flush out any rig components, hard lines and BOP stack that may have come in contact
with the cement.
Page 25
Milne Point Unit
J-46 SB Producer
PTD Application
Second Stage Surface Cement Job:
13.18 Prepare for the 2
nd stage as necessary. Circulate until first stage reaches sufficient compressive
strength. Try to maintain flow rate through stage tool until 2nd stage is ready. Hold pre-job safety
meeting.
13.19 HEC representative to witness the loading of the ES cementer closing plug in the cementing
head.
13.20 Fill surface lines with water and pressure test.
13.21 Pump remaining 60 bbls 10.5 ppg tuned spacer.
13.22 Mix and pump cmt per below recipe for the 2
nd stage.
13.23 Cement volume based on annular volume + open hole excess (200% for lead and 100% for tail).
Job will consist of lead & tail, TOC brought to surface.
Estimated 2nd Stage Total Cement Volume:
Cement Slurry Design (2nd stage cement job):
13.24 Continue pumping lead until uncontaminated spacer is seen at surface, then switch to tail.
13.25 After pumping cement, drop ES Cementer closing plug and displace cement with spud mud out
of mud pits.
13.26 Displacement calculation:
2500’ x 0.0732 bpf = 183.0 bbls mud
Lead Slurry Tail Slurry
System ArcticCem HalCem
Density 10.7 lb/gal 15.8 lb/gal
Yield 2.88 ft3/sk 1.17 ft3/sk
Mixed
Water 22.02 gal/sk 5.08 gal/sk
Page 26
Milne Point Unit
J-46 SB Producer
PTD Application
13.27 Monitor returns closely while displacing cement. Adjust pump rate if necessary. Wellhead side
outlet valve in cellar can be opened to take returns to cellar if required. Be prepared to pump out
fluid from cellar. Have black water available to retard setting of cement.
13.28 Decide ahead of time what will be done with cement returns once they are at surface. We should
circulate approximately 100 - 150 bbls of cement slurry to surface.
13.29 Land closing plug on stage collar and pressure up to 1,000 – 1,500 psi to ensure stage tool closes.
Follow instructions of Halliburton personnel. Bleed off pressure and check to ensure stage tool
has closed. Slips will be set as per plan to allow full annulus for returns during surface cement
job. Set slips.
13.30 Make initial cut on 9-5/8” final joint. L/D cut joint. Make final cut on 9-5/8”. Dress off stump.
Install 9-5/8” wellhead. If transition nipple is welded on, allow to cool as per schedule.
Ensure to report the following on wellez:
x Pre flush type, volume (bbls) & weight (ppg)
x Cement slurry type, lead or tail, volume & weight
x Pump rate while mixing, bpm, note any shutdown during mixing operations with a duration
x Pump rate while displacing, note whether displacement by pump truck or mud pumps, weight & type
of displacing fluid
x Note if casing is reciprocated or rotated during the job
x Calculated volume of displacement , actual displacement volume, whether plug bumped & bump
pressure, do floats hold
x Percent mud returns during job, if intermittent note timing during pumping of job. Final circulating
pressure
x Note if pre flush or cement returns at surface & volume
x Note time cement in place
x Note calculated top of cement
x Add any comments which would describe the success or problems during the cement job
Send final “As-Run” casing tally & casing and cement report to nathan.sperry@hilcorp.com and
joseph.lastufka@hilcorp.com This will be included with the EOW documentation that goes to the
AOGCC.
Page 27
Milne Point Unit
J-46 SB Producer
PTD Application
14.0 ND Diverter, NU BOPE, & Test
14.1 ND the diverter T, knife gate, diverter line & NU 11” x 13-5/8” 5M casing spool.
14.2 NU 13-5/8” x 5M BOP as follows:
x BOP configuration from top down: 13-5/8” x 5M annular / 13-5/8” x 5M double gate / 13-
5/8” x 5M mud cross / 13-5/8” x 5M single gate
x Double gate ram should be dressed with 4-1/2” x 7” VBRs in top cavity,blind ram in
bottom cavity.
x Single ram can be dressed with 2-7/8” x 5” VBRs
x NU bell nipple, install flowline.
x Install (1) manual valve & HCR valve on kill side of mud cross. (Manual valve closest to
mud cross).
x Install (1) manual valve on choke side of mud cross. Install an HRC outside of the manual
valve
14.3 RU MPD RCD and related equipment
14.4 Run 5” BOP test plug
14.5 Test BOP to 250/3,000 psi for 5/5 min. Test annular to 250/2,500 psi for 5/5 min.
x Test 2-7/8” x 5” rams with the 3-1/2” and 5” test joints
x Test the 4-1/2” x 7” rams with the 5” and 7” test joints.
x Confirm test pressures with PTD
x Ensure to monitor side outlet valves and annulus valve pressure gauges to ensure no pressure
is trapped underneath test plug
x Once BOPE test is complete, send a copy of the test report to town engineer and drilling tech
14.6 RD BOP test equipment
14.7 Dump and clean mud pits, send spud mud to G&I pad for injection.
14.8 Mix 8.9 ppg FloPro for production hole.
14.9 Set wearbushing in wellhead.
14.10 If needed, rack back as much 5” DP in derrick as possible to be used while drilling the hole
section.
14.11 Ensure 5” liners in mud pumps.
Page 28
Milne Point Unit
J-46 SB Producer
PTD Application
15.0 Drill 8-1/2” Hole Section
15.1 MU 8-1/2” Cleanout BHA (Milltooth Bit & 1.22° PDM)
15.2 TIH w/ 8-1/2” cleanout BHA to stage tool. Note depth TOC tagged on AM report. Drill out
stage tool.
15.3 TIH to TOC above the baffle adapter. Note depth TOC tagged on morning report.
15.4 RU and test casing to 2,500 psi / 30 min. Ensure to record volume / pressure (every ¼ bbl) and
plot on FIT graph. AOGCC reg is 50% of burst = 5,750 / 2 = ~2,875 psi, but max test pressure
on the well is 2,500 psi as per AOGCC. Document incremental volume pumped (and subsequent
pressure) and volume returned. Ensure rams are used to test casing as per AOGCC Industry
Guidance Bulletin 17-001.
15.5 Drill out shoe track and 20’ of new formation.
15.6 CBU and condition mud for FIT.
15.7 Conduct FIT to 12.0 ppg EMW. Chart Test. Ensure test is recorded on same chart as casing test.
Document incremental volume pumped (and subsequent pressure) and volume returned.
15.8 POOH and LD cleanout BHA
15.9 PU 8-1/2” directional BHA.
x Ensure BHA components have been inspected previously.
x Drift and caliper all components before MU. Visually verify no debris inside components that
cannot be drifted.
x Ensure TF offset is measured accurately and entered correctly into the MWD software.
x Ensure MWD is RU and operational.
x Have DD run hydraulics calculations on site to ensure optimum nozzle sizing. Hydraulics
calculations and recommended TFA is attached below.
x Drill string will be 5” 19.5# S-135 NC50.
Schrader Bluff Bit Jetting Guidelines
Formation Jetting TFA
NB 6 x 14 0.902
OA 6 x 13 0.778
OB 6 x 13 0.778
Casing test and FIT digital data to AOGCC upon completion of FIT. - mgr
Page 29
Milne Point Unit
J-46 SB Producer
PTD Application
15.10 8-1/2” hole section mud program summary:
x Density: Weighting material to be used for the hole section will be calcium carbonate.
Additional calcium carbonate will be on location to weight up the active system (1) ppg
above highest anticipated MW.
x Solids Concentration: It is imperative that the solids concentration be kept low while
drilling the production hole section. Keep the shaker screen size optimized and fluid
running to near the end of the shakers. It is okay if the shakers run slightly wet to ensure
we are running the finest screens possible.
x Rheology: Keep viscosifier additions to an absolute minimum (N-VIS). Data suggests
excessive viscosifier concentrations can decrease return permeability. Do not pump high
vis sweeps, instead use tandem sweeps. Ensure 6 rpm is > 8.5 (hole diameter) for
sufficient hole cleaning
x Run the centrifuge continuously while drilling the production hole, this will help with
solids removal.
x Dump and dilute as necessary to keep drilled solids to an absolute minimum.
x MD Totco PVT will be used throughout the drilling and completion phase. Remote
monitoring stations will be available at the driller’s console, Co Man office, &
Toolpusher office.
System Type:8.9 – 9.5 ppg FloPro drilling fluid
Properties:
Interval Density PV YP LSYP Total Solids MBT HPHT Hardness
Production 8.9-9.5 15-25 -
ALAP
15 - 30 4-6 <10% <8 <11.0 <100
Page 30
Milne Point Unit
J-46 SB Producer
PTD Application
System Formulation:
Product- production Size Pkg ppb or (% liquids)
Busan 1060 55 gal dm 0.095
FLOTROL 55 lb sx 6
CONQOR 404 WH (8.5 gal/100 bbls)55 gal dm 0.2
FLO-VIS PLUS 25 lb sx 0.7
KCl 50 lb sx 10.7
SMB 50 lb sx 0.45
LOTORQ 55 gal dm 1.0
SAFE-CARB 10 (verify)50 lb sx 10
SAFE-CARB 20 (verify)50 lb sx 10
Soda Ash 50 lb sx 0.5
15.11 TIH with 8-1/2” directional assembly to bottom
15.12 Install MPD RCD
15.13 Displace wellbore to 8.9 ppg FloPro drilling fluid
15.14 Begin drilling 8-1/2” hole section, on-bottom staging technique:
x Tag bottom and begin drilling with 100 - 120 rpms at bit. Allow WOB to stabilize at 5-8K.
x Slowly begin bringing up rpms, monitoring stick slip and BHA vibrations
x If BHA begins to show excessive vibrations / whirl / stick slip, it may be necessary to PU
off bottom and restart on bottom staging technique. If stick slip continues, consider adding
0.5% lubes
15.14 Drill 8-1/2” hole section to section TD per Geologist and Drilling Engineer.
x Flow Rate: 350-550 GPM, target min. AV’s 200 ft/min, 385 GPM
x RPM: 120+
x Ensure shaker screens are set up to handle this flowrate. Ensure shakers are running slightly
wet to maximize solids removal efficiency. Check for holes in screens on every connection.
x Keep pipe movement with pumps off to slow speeds, to keep surge and swab pressures low
x Take MWD surveys every stand, can be taken more frequently if deemed necessary, ex:
concretion deflection
x Monitor Torque and Drag with pumps on every 5 stands
x Monitor ECD, pump pressure & hookload trends for hole cleaning indication
x Good drilling and tripping practices are vital for avoidance of differential sticking. Make
every effort to keep the drill string moving whenever possible and avoid stopping with the
BHA across the sand for any extended period of time.
x Use ADR to stay in section. Reservoir plan is to stay in NB sand.
x Target ROP is as fast as we can clean the hole without having to backream connections.
x Schrader Bluff NB Concretions: 4-6% Historically
Page 31
Milne Point Unit
J-46 SB Producer
PTD Application
x MPD will be utilized to monitor pressure build up on connections.
x 8-1/2” Lateral A/C:
x H-13A has a 0.371 clearance factor. H-13A has been reservoir and surface
abandoned.
15.15 Reference:Halliburton has a procedure for Schrader OH sidetracks based on lessons
learned and best practices. Ensure the DD is referencing their procedure.
x Patience is key! Getting kicked off too quickly might have been the cause of failed liner
runs on past wells.
x If a known fault is coming up, put a slight “kick-off ramp” in wellbore ahead of the fault so
we have a nice place to low side.
x Attempt to lowside in a fast drilling interval where the wellbore is headed up.
x Orient TF to low side and dig a trough with high flowrates for the first 30 feet, working
string back and forth. Trough for approximately 30 minutes.
x Time drill at 4 to 6 feet per hour with high flow rates. Gradually increase ROP as the
openhole sidetrack is achieved.
15.16 At TD, CBU at least 4 times at 200 ft/min AV (385+ GPM) and rotation (120+ RPM). Pump
tandem sweeps if needed
x Monitor BU for increase in cuttings, cuttings in laterals come back in waves and not a consistent
stream, circulate more if necessary
x If seepage losses are seen while drilling, consider reducing MW at TD to 9.0 ppg minimum
15.17 Mix and pump 40 bbl 10 ppb SAPP pill. Line up to a closed loop system and circulate three SAP
pills with 50 bbl in between. Displace out SAP pills. Monitor shakers for returns of mud filter
cake and calcium carbonate. Circulate the well clean.
Losses during the cleanup of the wellbore are a good indication that the mud filter cake is being
removed, including an increase in the loss rate.
15.18 Displace 1.5 OH + liner volume with viscosified brine.
x Proposed brine blend (same as used on M-16, aiming for an 8 on the 6 RPM reading) -
KCl: 7.1ppb for 2%
NaCl: 60.9ppg for 9.4ppg
Lotorq: 1.5%
Lube 776: 1.5%
Soda Ash: as needed for 9.5pH
Busan 1060: 0.42ppb
Flo-Vis Plus: 1.25ppb
Page 32
Milne Point Unit
J-46 SB Producer
PTD Application
x Monitor well for loss rate and contact Drilling Engineer and/or Ops Engineer if further
discussion needed prior to BROOH.
15.15 Monitor the returned fluids carefully while displacing to brine. After 1 (or more if needed) BU,
Perform production screen test (PST). The brine has been properly conditioned when it will pass
the production screen test (x3 350 ml samples passing through the screen in the same amount
of time which will indicate no plugging of the screen). Reference PST Test Procedure
15.19 BROOH with the drilling assembly to the 9-5/8” casing shoe
x Circulate at full drill rate (less if losses are seen, 350 GPM minimum).
x Rotate at maximum RPM that can be sustained.
x Pulling speed 5 – 10 min/stand (slip to slip time, not including connections), adjust as
dictated by hole conditions
x When pulling across any OHST depths, turn pumps off and rotary off to minimize
disturbance. Trip back in hole past OHST depth to ensure liner will stay in correct
hole section, check with ABI compared to as drilled surveys
15.20 If abnormal pressure has been observed in the lateral, utilize MPD to close on connections while
BROOH.
15.21 CBU minimum two times at 9-5/8” shoe and clean casing with high vis sweeps.
15.22 Monitor well for flow/pressure build up with MPD. Increase fluid weight if necessary.
x Wellbore breathing has been seen on past MPU SB wells. Perform extended flow checks to
determine if well is breathing, treat all flow as an influx until proven otherwise
x If necessary, increase MW at shoe for any higher than expected pressure seen
x Ensure fluid coming out of hole has passed a PST at the possum belly
15.23 POOH and LD BHA.
15.24 Continue to POOH and stand back BHA if possible. Rabbit DP on TOOH, ensure rabbit
diameter is sufficient for future ball drops.
Only LWD open hole logs are planned for the hole section (GR + Res). There will not be any
additional logging runs conducted.
Page 33
Milne Point Unit
J-46 SB Producer
PTD Application
16.0 Run 5-1/2” x 4-1/2” Screened Liner
NOTE: If an open hole sidetrack was performed, drop the centralizers on the lowermost 2-3 joints and run them
slick.
16.1 Well control preparedness: In the event of an influx of formation fluids while running the 4-
1/2” screened liner, the following well control response procedure will be followed:
x P/U & M/U the 5” safety joint (with 5-1/2” crossover installed on bottom, TIW valve in open
position on top, 5-1/2” handling joint above TIW). This joint shall be fully M/U and
available prior to running the first joint of 5-1/2” screened liner.
x P/U & M/U the 5” safety joint (with 4-1/2” crossover installed on bottom, TIW valve in open
position on top, 4-1/2” handling joint above TIW). This joint shall be fully M/U and
available prior to running the first joint of 4-1/2” screened liner.
x Slack off and with 5” DP across the BOP, shut in ram or annular on 5” DP. Close TIW.
x Proceed with well kill operations.
16.2 R/U 4-1/2” liner running equipment.
x Ensure 4-1/2” 13.5# Hydril 625 x NC50 crossover is on rig floor and M/U to FOSV.
x Ensure all casing has been drifted on the deck prior to running.
x Be sure to count the total # of joints on the deck before running.
x Keep hole covered while R/U casing tools.
x Record OD’s, ID’s, lengths, S/N’s of all components w/ vendor & model info.
16.3 Run 4-1/2” screened production liner until XO point for 5-1/2” screens (planning 10,000’ of 4-
1/2” and the rest made up with 5-1/2”)
x Use API Modified or “Best O Life 2000 AG”thread compound. Dope pin end only w/ paint
brush. Wipe off excess. Thread compound can plug the screens
x Utilize a collar clamp until weight is sufficient to keep slips set properly.
x Use lift nubbins and stabbing guides for the liner run.
x Fill 4-½” liner with PST passed mud (to keep from plugging screens with solids)
x Install screen joints as per the Running Order (From Completion Engineer post TD).
o Do not place tongs or slips on screen joints
o Screen placement ±40’
o The screen connection is 4-1/2” 13.5# Hydril 625
x If liner length exceeds surface casing length, ensure centralizers are placed 1/jt for each joint
outside of the surface shoe. This is to mitigate difference sticking risk while running inner
string.
x Obtain up and down weights of the liner before entering open hole. Record rotating torque at
10 and 20 rpm
Page 34
Milne Point Unit
J-46 SB Producer
PTD Application
5-1/2” 20# L-80 EZGO HT Torque
OD Minimum Optimum Maximum
5-1/2 6,997 ft-lbs 10,728 ft-lbs
4-1/2” 13.5# L-80 Hydril 625 Torque
OD Minimum Optimum Maximum
4-1/2 8,000 ft-lbs 9,600 ft-lbs 12,800 ft-lbs
Page 35
Milne Point Unit
J-46 SB Producer
PTD Application
Page 36
Milne Point Unit
J-46 SB Producer
PTD Application
16.6. Ensure to run enough liner to provide for approx 150’ overlap inside 9-5/8” casing. Ensure
hanger/pkr will not be set in a 9-5/8” connection.
x AOGCC regulations require a minimum 100’ overlap between the inner and outer strings as
per 20 AAC 25.030(d)(6). Do not place liner hanger/packer across 9-5/8” connection.
16.7. Before picking up Baker SLZXP liner hanger / packer assy, count the # of joints on the pipe deck
to make sure it coincides with the pipe tally.
16.8. M/U Baker SLZXP liner top packer to 4-1/2” liner.
16.9. Note: PU, SO, ROT and torque of liner. Run liner in the hole one stand and pump through liner
hanger to ensure a clear flow path exists.
16.10. RIH with liner no faster than 30 ft/min – this is to prevent buckling the liner and drill string and
weight transfer to get liner to bottom with minimal rotation. Watch displacement carefully and
avoid surging the hole or buckling the liner. Slow down running speed if necessary.
x Ensure 5” DP/HWDP has been drifted
x There is no inner string planned to be run, as opposed to previous wells. The DP should auto
fill. Monitor FL and if filling is required due to losses/surging.
16.11. Slow in and out of slips. Ensure accurate slack off data is gathered during RIH. Record shoe
depth + SO depth every stand. Record torque value if it becomes necessary to rotate the string to
bottom.
16.12. Obtain up and down weights of the liner before entering open hole. Record rotating torque at 10,
& 20 RPM.
16.13. If any open hole sidetracks have been drilled, monitor sidetrack depths during run in and ensure
shoe enters correct hole.
16.14. TIH deeper than planned setting depth. Last motion of the liner should be up to ensure it is set in
tension.
16.15. Rig up to pump down the work string with the rig pumps.
16.16. Break circulation. Begin circulating at ~1 BPM and monitor pump pressures. Do not exceed
1,600 psi while circulating.Pusher tool is set at 2,100 psi with 5% shear screws but it should be
discussed before exceeding 1,600 psi. Note all losses. Confirm all pressures with Baker
16.17. Prior to setting the hanger and packer, double check all pipe tallies and record amount of drill
pipe left on location. Ensure all numbers coincide with proper setting depth of liner hanger.
Page 37
Milne Point Unit
J-46 SB Producer
PTD Application
16.18. Shut down pumps. Drop setting ball down the workstring and pump slowly (1-2 BPM). Slow
pump before the ball seats. Do not allow ball to slam into ball seat.
16.19. Continue pressuring up to 2,700 psi to set the SLZXP liner hanger/packer. Hold for 5 minutes.
Slack off 20K lbs on the SZXP liner hanger/packer to ensure the HRDE setting tool is in
compression for release from the SLZXP liner hanger/packer. Continue pressuring up 4,500 psi
to release the HRDE running tool.
16.20. Bleed DP pressure to 0 psi. Pick up to expose rotating dog sub and set down 50K without
pulling sleeve packoff. Pick back up without pulling sleeve packoff, begin rotating at 10-20
RPM and set down 50K again.
16.21. PU to neutral weight, close BOP and test annulus to 1,500 psi for 10 minutes charted.
16.22. Bleed off pressure and open BOPE. Pickup to verify that the HRD setting tool has released. If
packer did not test, rotating dog sub can be used to set packer. If running tool cannot be
hydraulically released, apply LH torque to mechanically release the setting tool.
16.23. PU pulling running tool free of the packer and displace at max rate to wash the liner top. Pump
sweeps as needed.
16.24. POOH. LD and inspect running tools. If setting of liner hanger/packer proceeded as planned,
LD DP on the TOOH.
Note: Once running tool is LD, swap to the completion AFE.
Page 38
Milne Point Unit
J-46 SB Producer
PTD Application
17.0 Run 7” Tieback
17.1 RU and pull wear bushing. Get an accurate measurement of RKB to tubing hanger load shoulder
to be used for tie-back space out calculation. Install 7” solid body casing rams in the upper ram
cavity. RU testing equipment. PT to 250/3,000 psi with 7” test joint. RD testing equipment.
17.2 RU 7” casing handling equipment.
x Ensure XO to DP made up to FOSV and ready on rig floor.
x Rig up computer torque monitoring service.
x String should stay full while running, RU fill up line and check as appropriate.
17.3 PU 7” tieback seal assembly and set in rotary table. Ensure 7” seal assembly has (4) 1” holes
above the first seal. These holes will be used to spot diesel freeze protect in the 9-5/8” x 7”
annulus.
17.4 MU first joint of 7” to seal assy.
17.5 Run 7”, 26#, L-80 TXP tieback tieback to position seal assembly two joints above tieback sleeve.
Record PU and SO weights.
7”, 26#, L-80, TXP
=Casing OD Torque (Min) Torque (Opt)Torque (Max)Torque (Operating)
7”13,280 ft-lbs 14,750 ft-lbs 16,230 ft-lbs 20,000 ft-lbs
Page 39
Milne Point Unit
J-46 SB Producer
PTD Application
Page 40
Milne Point Unit
J-46 SB Producer
PTD Application
17.5 MU 7” to DP crossover.
17.5 MU stand of DP to string, and MU top drive.
17.5 Break circulation at 1 BPM and begin lowering string.
17.5 Note seal assembly entering tieback sleeve with a pressure increase, stop pumping and bleed off
pressure. Leave standpipe bleed off valve open.
17.5 Continue lowering string and land out on no-go. Set down 5 – 10K and mark the pipe as “NO-
GO DEPTH”.
17.5 PU string & remove unnecessary 7” joints.
17.5 Space out with pups as needed to leave the no-go 1 ft above fully no-go position when the casing
hanger is landed. Ensure one full joint is below the casing hanger.
17.5 PU and MU the 7” casing hanger.
17.5 Ensure circulation is possible through 7” string.
17.5 RU and circulation corrosion inhibited brine in the 9-5/8” x 7” annulus.
17.5 With seals stabbed into tieback sleeve, spot diesel freeze protection from 2,500’ TVD to surface
in 9-5/8” x 7” annulus by reverse circulating through the holes in the seal assembly. Ensure
annular pressure are limited to prevent collapse of the 7” casing (verify collapse pressure of 7”
tieback seal assembly).
17.5 SO and land hanger. Confirm hanger has seated properly in wellhead. Make note of actual
weight on hanger on morning report.
17.5 Back out the landing joint. MU packoff running tool and install packoff on bottom of landing
joint. Set casing hanger packoff and RILDS. PT void to 3,000 psi for 10 minutes.
17.5 RD casing running tools.
17.5 PT 9-5/8” x 7” annulus to 1,500 psi for 30 minutes charted.
Page 41
Milne Point Unit
J-46 SB Producer
PTD Application
18.0 Run Upper Completion – ESP
18.1 RU to run 3-1/2”, 9.3#, L-80 EUE tubing.
x Ensure wear bushing is pulled.
x Ensure 3-1/2”, L-80, 9.3#, EUE 8RD x NC50 crossover is on rig floor and M/U to FOSV.
x Ensure all tubing has been drifted in the pipe shed prior to running.
x Be sure to count the total # of joints in the pipe shed before running.
x Keep hole covered while RU casing tools.
x Record OD’s, ID’s, lengths, SN’s of all components with vendor & model info.
x Monitor displacement from wellbore while RIH.
Page 42
Milne Point Unit
J-46 SB Producer
PTD Application
18.2 PU, MU and RH with the following 3-1/2” ESP completion (confirm tally with Operations
Engineer where to place ESP base):
Colors indicate assemblies to be bucked up prior to RWO.
Nom.
Size ~Length Item Lb/ft Material Notes
Centralizer ~L-80
Sensor, Zenith L-80 Baker
Motor L-80 Summit
Lower Tandem Seal L-80 Summit
Upper Tandem Seal L-80 Summit
Gas Avoider L-80 Summit
Gas Seperator L-80 Summit
Pump L-80 Summit
Pump L-80 Summit
3-
1/2''Zenith Ported Sub Press Port L-80 Baker
3-
1/2'' 1 joint L-80
3-
1/2''10'Pup Joint 9.2 L-80
3-
1/2''3-1/2' XN nip L-80
3-
1/2''10'Pup Joint 9.2 L-80
3-
1/2'' 1 joint L-80
3-
1/2’’GLM with DMY
3-
1/2''Joints 9.2 L-80
3-
1/2’’GLM with live valve Placed +- 110’ MD
3-
1/2''Space out PUPS 9.2 L-80
3-
1/2'' 1 joint 9.2 L-80
3-
1/2''PUP 9.2 L-80
4-
1/2''Tubing Hanger 9.2 L-80
18.3 PU and MU the 4-1/2” tubing hanger. Make final splice of the ESP wire and ensure any unused
control line ports are dummied off.
Page 43
Milne Point Unit
J-46 SB Producer
PTD Application
18.4 Record PU and SO weights before landing hanger. Note PU and SO weights on tally along with
band/clamp summary.
18.5 Land the tubing hanger and RILDS. Lay down the landing joint.
18.6 Install 4” HP BPV. ND BOP. Install the plug off tool.
18.7 NU the tubing head adapter and NU the tree.
18.8 PT the tubing hanger void to 500/5,000 psi. PT the tree to 250/5,000 psi.
18.9 Pull the plug off tool and BPV.
18.10 Reverse circulate the well over to corrosion inhibited source water follow by diesel freeze protect
to 2,500’ MD.
18.11 Prepare to hand over well to production. Ensure necessary forms filled out and well handed over
with valve alignment as per operations personnel.
18.12 RDMO
Page 44
Milne Point Unit
J-46 SB Producer
PTD Application
19.0 Doyon 14 Diverter Schematic
Page 45
Milne Point Unit
J-46 SB Producer
PTD Application
20.0 Doyon 14 BOP Schematic
Page 46
Milne Point Unit
J-46 SB Producer
PTD Application
21.0 Wellhead Schematic
Page 47
Milne Point Unit
J-46 SB Producer
PTD Application
22.0 Days Vs Depth
Page 48
Milne Point Unit
J-46 SB Producer
PTD Application
23.0 Formation Tops & Information
MPU J-46 Formations TVD
(ft)
TVDss
(ft)
MD
(ft)
Formation Pressure
(psi)
EMW
(ppg)
BPRF 1924 1858 1995 846 8.46
SV1 2126 2060 2213 935 8.46
UG LA3 3362 3296 3515 1479 8.46
UG_MB 3599 3533 3838 1583 8.46
SCHRADER NA 3951 3885 5044 1738 8.46
SCHRADER NB 3990 3924 5502 1755 8.46
Page 49
Milne Point Unit
J-46 SB Producer
PTD Application
24.0 Anticipated Drilling Hazards
12-1/4” Hole Section:
Lost Circulation
Ensure adequate amounts of LCM are available. Monitor fluid volumes to detect any early signs of lost
circulation. For minor seepage losses, consider adding small amounts of calcium carbonate.
Gas Hydrates
Gas hydrates are generally not seen on J-pad. Remember that hydrate gas behaves differently from a gas
sand. Additional fluid density will not prevent influx of gas hydrates, but can help control the breakout
at surface. Once a gas hydrate has been disturbed the gas will come out of the hole. Drill through the
hydrate section as quickly as possible while minimizing gas belching. Minimize circulation time while
drilling through the hydrate zone. Excessive circulation will accelerate formation thawing which can
increase the amount of hydrates released into the wellbore. Keep the mud circulation temperature as
cold as possible. Weigh mud with both a pressurized and non-pressurized mud scale. The non-
pressurized scale will reflect the actual mud cut weight. Isolate/dump contaminated fluid to remove
hydrates from the system.
Hole Cleaning:
Maintain rheology of mud system. Sweep hole with high viscosity sweeps as necessary. Optimize
solids control equipment to maintain density, sand content, and reduce the waste stream. Monitor
ECD’s to determine if additional circulation time is necessary. In a highly deviated wellbore, pipe
rotation is critical for effective hole cleaning. Rotate at maximum RPM’s when CBU, and keep pipe
moving to avoid washing out a particular section of the hole. Ensure to clean the hole with rotation after
slide intervals. Do not out drill our ability to clean the hole.
Anti-Collison:
There are no known wells with a clearance factory <1.0. Take directional surveys every stand, take
additional surveys if necessary. Continuously monitor proximity to offset wellbores and record any
close approaches on AM report.
Well Specific A/C:
x There are no wells with a clearance factor of <1.0
Wellbore stability (Permafrost, running sands and gravel, conductor broaching):
Washouts in the permafrost can be severe if the string is left circulating across it for extended periods of
time. Keep mud as cool as possible by taking on cold water and diluting often. High TOH and RIH
speeds can aggravate fragile shale/coal formations due to the pressure variations between surge and
swab. Bring the pumps on slowly after connections. Monitor conductor for any signs of broaching.
Maintain mud parameters and increase MW to combat running sands and gravel formations.
Page 50
Milne Point Unit
J-46 SB Producer
PTD Application
H2S:
Treat every hole section as though it has the potential for H2S. MPU J-pad is not known for H2S. J-10
had 10ppm H2S (2013) and J-18 had 9.6 (2009).
1. The AOGCC will be notified within 24 hours if H2S is encountered in excess of 20 ppm during
drilling operations.
2. The rig will have fully functioning automatic H2S detection equipment meeting the requirements
of 20 AAC 25.066.
3. In the event H2S is detected, wellwork will be suspended and personnel evacuated until a
detailed mitigation procedure can be developed.
Page 51
Milne Point Unit
J-46 SB Producer
PTD Application
8-1/2” Hole Section:
Hole Cleaning:
Maintain rheology of mud system. Sweep hole with low-vis water sweeps. Ensure shakers are set up
with appropriate screens to maximize solids removal efficiency. Run centrifuge continuously. Monitor
ECDs to determine if additional circulation time is necessary. In a highly deviated wellbore, pipe
rotation is critical for effective hole cleaning. Rotate at maximum RPMs when CBU and keep pipe
moving to avoid washing out a particular section of the wellbore. Ensure to clean the hole with rotation
after slide intervals. Do not out drill our ability to clean the hole. Maint. circulation rate of > 300 gpm
Lost Circulation:
Ensure adequate amounts of LCM are available. Monitor fluid volumes to detect any early signs of lost
circulation. For minor seepage losses, consider adding small amounts of calcium carbonate.
Faulting:
There are multiple planned fault crossings for J-46.
H2S:
Treat every hole section as though it has the potential for H2S. MPU J-pad is not known for H2S. J-10
had 10ppm H2S (2013) and J-18 had 9.6 (2009).
1. The AOGCC will be notified within 24 hours if H2S is encountered in excess of 20 ppm during
drilling operations.
2. The rig will have fully functioning automatic H2S detection equipment meeting the requirements
of 20 AAC 25.066.
3. In the event H2S is detected, wellwork will be suspended and personnel evacuated until a
detailed mitigation procedure can be developed.
Abnormal Pressures and Temperatures:
Reservoir pressures are expected to be normal. Utilize MPD to mitigate any abnormal pressure seen.
Anti-Collision
Take directional surveys every stand, take additional surveys if necessary. Continuously monitor
drilling parameters for signs of magnetic interference with another well. Reference A/C report in
directional plan.
Well Specific AC:
x H-13A has a 0.371 clearance factor. H-13A has been reservoir and surface abandoned.H-13A has a 0.371 clearance factor. H-13A has been reservoir and surface abandoned
Page 52
Milne Point Unit
J-46 SB Producer
PTD Application
25.0 Doyon 14 Rig Layout
Page 53
Milne Point Unit
J-46 SB Producer
PTD Application
26.0 FIT Procedure
Formation Integrity Test (FIT) and
Leak-Off Test (LOT) Procedures
Procedure for FIT:
1. Drill 20' of new formation below the casing shoe (this does not include rat hole below the shoe).
2. Circulate the hole to establish a uniform mud density throughout the system. P/U into the shoe.
3. Close the blowout preventer (ram or annular).
4. Pump down the drill stem at 1/4 to 1/2 bpm.
5. On a graph with the recent casing test already shown, plot the fluid pumped (volume or strokes) vs.
drill pipe pressure until appropriate surface pressure is achieved for FIT at shoe.
6. Shut down at required surface pressure. Hold for a minimum 10 minutes or until the pressure stabilizes.
Record time vs. pressure in 1-minute intervals.
7. Bleed the pressure off and record the fluid volume recovered.
The pre-determined surface pressure for each formation integrity test is based on achieving an EMW at
least 1.0 ppg higher than the estimated reservoir pressure, and allowing for an appropriate amount of kick
tolerance in case well control measures are required.
Where required, the LOT is performed in the same fashion as the formation integrity test. Instead of
stopping at a pre-determined point, surface pressure is increased until the formation begins to take fluid;
at this point the pressure will continue to rise, but at a slower rate. The system is shut in and pressure
monitored as with an FIT.
Ensure that casing test and subsequent FIT tests are recorded on the same chart. Document incremental
volume pumped and returned during test.
Page 54
Milne Point Unit
J-46 SB Producer
PTD Application
27.0 Doyon 14 Rig Choke Manifold Schematic
Page 55
Milne Point Unit
J-46 SB Producer
PTD Application
28.0 Casing Design
Page 56
Milne Point Unit
J-46 SB Producer
PTD Application
29.0 8-1/2” Hole Section MASP
Page 57
Milne Point Unit
J-46 SB Producer
PTD Application
30.0 Spider Plot (NAD 27) (Governmental Sections)
Page 58
Milne Point Unit
J-46 SB Producer
PTD Application
31.0 Surface Plat (As Built) (NAD 27)
6WDQGDUG3URSRVDO5HSRUW
2FWREHU
3ODQ038-ZS
+LOFRUS$ODVND//&
0LOQH3RLQW
03W-3DG
3ODQ038-
038-
080016002400320040004800True Vertical Depth (1600 usft/in)-1600 -800 0 800 1600 2400 3200 4000 4800 5600 6400 7200 8000 8800 9600 10400 11200 12000 12800 13600Vertical Section at 105.47° (1600 usft/in)MPU J-46 wp05 tgt02MPU J-46 wp05 tgt01MPU J-46 wp05 tgt03MPU J-46 wp05 tgt04MPU J-46 wp05 tgt05MPU J-46 wp05 tgt06MPU J-46 wp05 tgt07MPU J-46 wp05 tgt08MPU J-46 wp05 tgt09MPU J-46 wp05 tgt10MPU J-46 wp05 tgt12MPU J-46 wp05 tgt13MPU J-46 wp05 tgt14MPU J-46 wp05 tgt15MPU J-46 wp05 tgt16MPU J-46 wp05 tgt17MPU J-46 wp05 tgt119 5/8" x 12 1/4"4 1/2" x 8 1/2"500100015002000250030003500400045005000550060006500700075008000850090009500100001050011000115001200012500130001350014000145001500015500160001650016878MPU J-46 wp06Start Dir 3º/100' : 480' MD, 480'TVDEnd Dir : 1228.49' MD, 1211.07' TVDStart Dir 4.25º/100' : 2183.18' MD, 2098.87'TVDEnd Dir : 4677.96' MD, 3919.44' TVDBegin GeosteeringTotal Depth : 16877.67' MD, 4240.3' TVDSV6Base PermafrostSV1UG_LA3UG_MBSB_NASB_NBHilcorp Alaska, LLCCalculation Method:Minimum CurvatureError System:ISCWSAScan Method: Closest Approach 3DError Surface: Ellipsoid SeparationWarning Method: Error RatioWELL DETAILS: Plan: MPU J-4632.60+N/-S+E/-WNorthingEastingLatitudeLongitude0.000.006014759.43552123.71 70° 27' 3.8209 N 149° 34' 29.0052 WSURVEY PROGRAMDate: 2024-04-24T00:00:00 Validated: Yes Version: Depth From Depth To Survey/Plan Tool33.70 1500.00 MPU J-46 wp06 (MPU J-46) GYD_Quest GWD1500.00 5100.00 MPU J-46 wp06 (MPU J-46) 3_MWD+IFR2+MS+Sag5100.00 16877.67 MPU J-46 wp06 (MPU J-46) GYD_Quest GWDFORMATION TOP DETAILSTVDPath TVDssPath MDPath Formation896.30 830.00 899.41 SV61924.30 1858.00 1995.45 Base Permafrost2126.30 2060.00 2212.55 SV13362.30 3296.00 3514.86 UG_LA33599.30 3533.00 3837.79 UG_MB3951.30 3885.00 5043.54 SB_NA3990.30 3924.00 5501.56 SB_NBREFERENCE INFORMATIONCo-ordinate (N/E) Reference:Well Plan: MPU J-46, True NorthVertical (TVD) Reference:as built rkb @ 66.30usftMeasured Depth Reference:as built rkb @ 66.30usftCalculation Method: Minimum CurvatureProject:Milne PointSite:M Pt J PadWell:Plan: MPU J-46Wellbore:MPU J-46Design:MPU J-46 wp06CASING DETAILSTVD TVDSS MD SizeName3956.19 3889.89 5100.00 9-5/8 9 5/8" x 12 1/4"4240.30 4174.00 16877.67 4-1/2 4 1/2" x 8 1/2"SECTION DETAILSSec MD Inc Azi TVD +N/-S +E/-W Dleg TFace VSect Target Annotation1 33.70 0.00 0.00 33.70 0.00 0.00 0.00 0.00 0.002 480.00 0.00 0.00 480.00 0.00 0.00 0.00 0.00 0.00 Start Dir 3º/100' : 480' MD, 480'TVD3 680.00 6.00 250.00 679.63 -3.58 -9.83 3.00 250.00 -8.524 1228.49 21.57 277.18 1211.07 -0.77 -137.70 3.00 36.36 -132.51 End Dir : 1228.49' MD, 1211.07' TVD5 2183.18 21.57 277.18 2098.87 43.08 -485.99 0.00 0.00 -479.87 Start Dir 4.25º/100' : 2183.18' MD, 2098.87'TVD6 4677.96 85.00 110.00 3919.44 -484.59 536.61 4.25 -166.70 646.41 End Dir : 4677.96' MD, 3919.44' TVD7 5077.96 85.00 110.00 3954.30 -620.88 911.06 0.00 0.00 1043.64 MPU J-46 wp05 tgt018 5089.77 85.11 110.28 3955.32 -624.93 922.11 2.50 68.41 1055.379 5470.73 85.11 110.28 3987.80 -756.46 1278.16 0.00 0.00 1433.6110 5654.57 88.00 108.00 3998.85 -816.61 1451.49 2.00 -38.23 1616.7011 6154.57 88.00 108.00 4016.30 -971.02 1926.73 0.00 0.00 2115.91 MPU J-46 wp05 tgt0312 6552.49 89.44 100.17 4025.19 -1067.76 2312.29 2.00 -79.65 2513.3113 7972.67 89.44 100.17 4038.98 -1318.54 3710.08 0.00 0.00 3927.3514 7996.45 89.00 100.00 4039.30 -1322.70 3733.49 2.00 -158.89 3951.02 MPU J-46 wp05 tgt0515 8189.64 90.60 95.44 4039.98 -1348.65 3924.87 2.50 -70.70 4142.3916 9361.91 90.60 95.44 4027.74 -1459.82 5091.80 0.00 0.00 5296.7017 9465.47 91.00 98.00 4026.30 -1471.94 5194.63 2.50 81.05 5399.04 MPU J-46 wp05 tgt0718 10147.12 88.54 118.30 4029.04 -1683.16 5838.92 3.00 96.87 6076.3319 10207.99 88.54 118.30 4030.59 -1712.01 5892.49 0.00 0.00 6135.6520 10620.99 87.00 106.00 4046.70 -1867.34 6273.97 3.00 -97.37 6544.7421 11090.99 87.00 106.00 4071.30 -1996.71 6725.14 0.00 0.00 7014.07 MPU J-46 wp05 tgt1022 11159.87 89.00 106.52 4073.70 -2015.98 6791.22 3.00 14.66 7082.9023 11629.80 89.00 106.52 4081.91 -2149.61 7241.68 0.00 0.00 7552.6824 11751.01 89.90 103.00 4083.08 -2180.49 7358.86 3.00 -75.68 7673.8525 12451.01 89.90 103.00 4084.30 -2337.95 8040.91 0.00 0.00 8373.20 MPU J-46 wp05 tgt1226 12500.92 89.11 103.61 4084.73 -2349.44 8089.48 2.00 142.36 8423.0727 14146.15 89.11 103.61 4110.30 -2736.52 9688.33 0.00 0.00 10067.24 MPU J-46 wp05 tgt1328 14194.08 87.85 104.06 4111.57 -2747.98 9734.85 2.80 160.54 10115.1329 14671.67 87.85 104.06 4129.52 -2863.89 10197.81 0.00 0.00 10592.2430 14760.62 85.50 104.90 4134.69 -2886.09 10283.79 2.80 160.28 10681.0231 15660.62 85.50 104.90 4205.30 -3116.80 11150.84 0.00 0.00 11578.21 MPU J-46 wp05 tgt1532 15810.15 88.32 103.90 4213.36 -3153.93 11295.45 2.00 -19.49 11727.4733 16319.65 88.32 103.90 4228.30 -3276.29 11789.81 0.00 0.00 12236.56 MPU J-46 wp05 tgt1634 16344.46 88.78 104.09 4228.93 -3282.29 11813.88 2.00 22.57 12261.3635 16877.67 88.78 104.09 4240.30 -3412.09 12330.92 0.00 0.00 12794.30 MPU J-46 wp05 tgt17 Total Depth : 16877.67' MD, 4240.3' TVD
-5250-4500-3750-3000-2250-1500-750075015002250South(-)/North(+) (1500 usft/in)-750 0 750 1500 2250 3000 3750 4500 5250 6000 6750 7500 8250 9000 9750 10500 11250 12000 12750West(-)/East(+) (1500 usft/in)MPU J-46 wp05 tgt11MPU J-46 wp05 tgt17MPU J-46 wp05 tgt16MPU J-46 wp05 tgt15MPU J-46 wp05 tgt14MPU J-46 wp05 tgt13MPU J-46 wp05 tgt12MPU J-46 wp05 tgt10MPU J-46 wp05 tgt09MPU J-46 wp05 tgt08MPU J-46 wp05 tgt07MPU J-46 wp05 tgt06MPU J-46 wp05 tgt05MPU J-46 wp05 tgt04MPU J-46 wp05 tgt03MPU J-46 wp05 tgt01MPU J-46 wp05 tgt029 5/8" x 12 1/4"4 1/2" x 8 1/2"22502 5 0 03500 375040004240MPU J-46 wp06Start Dir 3º/100' : 480' MD, 480'TVDStart Dir 4.25º/100' : 2183.18' MD, 2098.87'TVDEnd Dir : 4677.96' MD, 3919.44' TVDBegin GeosteeringTotal Depth : 16877.67' MD, 4240.3' TVDCASING DETAILSTVDTVDSS MDSize Name3956.19 3889.89 5100.00 9-5/8 9 5/8" x 12 1/4"4240.30 4174.00 16877.67 4-1/2 4 1/2" x 8 1/2"Project: Milne PointSite: M Pt J PadWell: Plan: MPU J-46Wellbore: MPU J-46Plan: MPU J-46 wp06WELL DETAILS: Plan: MPU J-4632.60+N/-S+E/-WNorthing Easting Latitude Longitude0.00 0.006014759.43552123.71 70° 27' 3.8209 N 149° 34' 29.0052 WREFERENCE INFORMATIONCo-ordinate (N/E) Reference:Well Plan: MPU J-46, True NorthVertical (TVD) Reference:as built rkb @ 66.30usftMeasured Depth Reference:as built rkb @ 66.30usftCalculation Method:Minimum Curvature
3URMHFW
&RPSDQ\
/RFDO&RRUGLQDWH5HIHUHQFH
79'5HIHUHQFH
6LWH
+LOFRUS$ODVND//&
0LOQH3RLQW
03W-3DG
6WDQGDUG3URSRVDO5HSRUW
:HOO
:HOOERUH
3ODQ038-
038-
6XUYH\&DOFXODWLRQ0HWKRG0LQLPXP&XUYDWXUH
DVEXLOWUNE#XVIW
'HVLJQ038-ZS
'DWDEDVH1257+86&$1$'$
0'5HIHUHQFHDVEXLOWUNE#XVIW
1RUWK5HIHUHQFH
:HOO3ODQ038-
7UXH
0DS6\VWHP
*HR'DWXP
3URMHFW
0DS=RQH
6\VWHP'DWXP866WDWH3ODQH([DFWVROXWLRQ
1$'1$'&21&2186
0LOQH3RLQW$&70,/1(32,17
$ODVND=RQH
0HDQ6HD/HYHO
8VLQJ:HOO5HIHUHQFH3RLQW
8VLQJJHRGHWLFVFDOHIDFWRU
6LWH3RVLWLRQ
)URP
6LWH
/DWLWXGH
/RQJLWXGH
3RVLWLRQ8QFHUWDLQW\
1RUWKLQJ
(DVWLQJ
*ULG&RQYHUJHQFH
03W-3DG75
XVIW
0DS XVIW
XVIW
6ORW5DGLXV
1
:
:HOO
:HOO3RVLWLRQ
/RQJLWXGH
/DWLWXGH
(DVWLQJ
1RUWKLQJ
XVIW
(:
16
3RVLWLRQ8QFHUWDLQW\
XVIW
XVIW
XVIW*URXQG/HYHO
3ODQ038-
XVIW
XVIW
:HOOKHDG(OHYDWLRQXVIW
1
:
:HOOERUH
'HFOLQDWLRQ
)LHOG6WUHQJWK
Q7
6DPSOH'DWH 'LS$QJOH
038-
0RGHO1DPH0DJQHWLFV
%**0
3KDVH9HUVLRQ
$XGLW1RWHV
'HVLJQ 038-ZS
3/$1
9HUWLFDO6HFWLRQ 'HSWK)URP79'
XVIW
16
XVIW
'LUHFWLRQ
(:
XVIW
7LH2Q'HSWK
$0 &203$66%XLOG(3DJH
3URMHFW
&RPSDQ\
/RFDO&RRUGLQDWH5HIHUHQFH
79'5HIHUHQFH
6LWH
+LOFRUS$ODVND//&
0LOQH3RLQW
03W-3DG
6WDQGDUG3URSRVDO5HSRUW
:HOO
:HOOERUH
3ODQ038-
038-
6XUYH\&DOFXODWLRQ0HWKRG0LQLPXP&XUYDWXUH
DVEXLOWUNE#XVIW
'HVLJQ038-ZS
'DWDEDVH1257+86&$1$'$
0'5HIHUHQFHDVEXLOWUNE#XVIW
1RUWK5HIHUHQFH
:HOO3ODQ038-
7UXH
,QFOLQDWLRQ
$]LPXWK
(:
XVIW
7RRO)DFH
16
XVIW
0HDVXUHG
'HSWK
XVIW
9HUWLFDO
'HSWK
XVIW
'RJOHJ
5DWH
XVIW
%XLOG
5DWH
XVIW
7XUQ
5DWH
XVIW
3ODQ6HFWLRQV
79'
6\VWHP
XVIW
$0 &203$66%XLOG(3DJH
3URMHFW
&RPSDQ\
/RFDO&RRUGLQDWH5HIHUHQFH
79'5HIHUHQFH
6LWH
+LOFRUS$ODVND//&
0LOQH3RLQW
03W-3DG
6WDQGDUG3URSRVDO5HSRUW
:HOO
:HOOERUH
3ODQ038-
038-
6XUYH\&DOFXODWLRQ0HWKRG0LQLPXP&XUYDWXUH
DVEXLOWUNE#XVIW
'HVLJQ038-ZS
'DWDEDVH1257+86&$1$'$
0'5HIHUHQFHDVEXLOWUNE#XVIW
1RUWK5HIHUHQFH
:HOO3ODQ038-
7UXH
0HDVXUHG
'HSWK
XVIW
,QFOLQDWLRQ
$]LPXWK
(:
XVIW
0DS
1RUWKLQJ
XVIW
0DS
(DVWLQJ
XVIW
16
XVIW
3ODQQHG6XUYH\
9HUWLFDO
'HSWK
XVIW
79'VV
XVIW
'/6
9HUW6HFWLRQ
6WDUW'LU
0'
79'
69
(QG'LU
0'
79'
%DVH3HUPDIURVW
6WDUW'LU
0'
79'
69
$0 &203$66%XLOG(3DJH
3URMHFW
&RPSDQ\
/RFDO&RRUGLQDWH5HIHUHQFH
79'5HIHUHQFH
6LWH
+LOFRUS$ODVND//&
0LOQH3RLQW
03W-3DG
6WDQGDUG3URSRVDO5HSRUW
:HOO
:HOOERUH
3ODQ038-
038-
6XUYH\&DOFXODWLRQ0HWKRG0LQLPXP&XUYDWXUH
DVEXLOWUNE#XVIW
'HVLJQ038-ZS
'DWDEDVH1257+86&$1$'$
0'5HIHUHQFHDVEXLOWUNE#XVIW
1RUWK5HIHUHQFH
:HOO3ODQ038-
7UXH
0HDVXUHG
'HSWK
XVIW
,QFOLQDWLRQ
$]LPXWK
(:
XVIW
0DS
1RUWKLQJ
XVIW
0DS
(DVWLQJ
XVIW
16
XVIW
3ODQQHG6XUYH\
9HUWLFDO
'HSWK
XVIW
79'VV
XVIW
'/6
9HUW6HFWLRQ
8*B/$
8*B0%
(QG'LU
0'
79'
6%B1$
[
%HJLQ*HRVWHHULQJ
6%B1%
$0 &203$66%XLOG(3DJH
3URMHFW
&RPSDQ\
/RFDO&RRUGLQDWH5HIHUHQFH
79'5HIHUHQFH
6LWH
+LOFRUS$ODVND//&
0LOQH3RLQW
03W-3DG
6WDQGDUG3URSRVDO5HSRUW
:HOO
:HOOERUH
3ODQ038-
038-
6XUYH\&DOFXODWLRQ0HWKRG0LQLPXP&XUYDWXUH
DVEXLOWUNE#XVIW
'HVLJQ038-ZS
'DWDEDVH1257+86&$1$'$
0'5HIHUHQFHDVEXLOWUNE#XVIW
1RUWK5HIHUHQFH
:HOO3ODQ038-
7UXH
0HDVXUHG
'HSWK
XVIW
,QFOLQDWLRQ
$]LPXWK
(:
XVIW
0DS
1RUWKLQJ
XVIW
0DS
(DVWLQJ
XVIW
16
XVIW
3ODQQHG6XUYH\
9HUWLFDO
'HSWK
XVIW
79'VV
XVIW
'/6
9HUW6HFWLRQ
$0 &203$66%XLOG(3DJH
3URMHFW
&RPSDQ\
/RFDO&RRUGLQDWH5HIHUHQFH
79'5HIHUHQFH
6LWH
+LOFRUS$ODVND//&
0LOQH3RLQW
03W-3DG
6WDQGDUG3URSRVDO5HSRUW
:HOO
:HOOERUH
3ODQ038-
038-
6XUYH\&DOFXODWLRQ0HWKRG0LQLPXP&XUYDWXUH
DVEXLOWUNE#XVIW
'HVLJQ038-ZS
'DWDEDVH1257+86&$1$'$
0'5HIHUHQFHDVEXLOWUNE#XVIW
1RUWK5HIHUHQFH
:HOO3ODQ038-
7UXH
0HDVXUHG
'HSWK
XVIW
,QFOLQDWLRQ
$]LPXWK
(:
XVIW
0DS
1RUWKLQJ
XVIW
0DS
(DVWLQJ
XVIW
16
XVIW
3ODQQHG6XUYH\
9HUWLFDO
'HSWK
XVIW
79'VV
XVIW
'/6
9HUW6HFWLRQ
$0 &203$66%XLOG(3DJH
3URMHFW
&RPSDQ\
/RFDO&RRUGLQDWH5HIHUHQFH
79'5HIHUHQFH
6LWH
+LOFRUS$ODVND//&
0LOQH3RLQW
03W-3DG
6WDQGDUG3URSRVDO5HSRUW
:HOO
:HOOERUH
3ODQ038-
038-
6XUYH\&DOFXODWLRQ0HWKRG0LQLPXP&XUYDWXUH
DVEXLOWUNE#XVIW
'HVLJQ038-ZS
'DWDEDVH1257+86&$1$'$
0'5HIHUHQFHDVEXLOWUNE#XVIW
1RUWK5HIHUHQFH
:HOO3ODQ038-
7UXH
0HDVXUHG
'HSWK
XVIW
,QFOLQDWLRQ
$]LPXWK
(:
XVIW
0DS
1RUWKLQJ
XVIW
0DS
(DVWLQJ
XVIW
16
XVIW
3ODQQHG6XUYH\
9HUWLFDO
'HSWK
XVIW
79'VV
XVIW
'/6
9HUW6HFWLRQ
7RWDO'HSWK
0'
79'[
$0 &203$66%XLOG(3DJH
3URMHFW
&RPSDQ\
/RFDO&RRUGLQDWH5HIHUHQFH
79'5HIHUHQFH
6LWH
+LOFRUS$ODVND//&
0LOQH3RLQW
03W-3DG
6WDQGDUG3URSRVDO5HSRUW
:HOO
:HOOERUH
3ODQ038-
038-
6XUYH\&DOFXODWLRQ0HWKRG0LQLPXP&XUYDWXUH
DVEXLOWUNE#XVIW
'HVLJQ038-ZS
'DWDEDVH1257+86&$1$'$
0'5HIHUHQFHDVEXLOWUNE#XVIW
1RUWK5HIHUHQFH
:HOO3ODQ038-
7UXH
7DUJHW1DPH
KLWPLVVWDUJHW
6KDSH
79'
XVIW
1RUWKLQJ
XVIW
(DVWLQJ
XVIW
16
XVIW
(:
XVIW
7DUJHWV
'LS$QJOH
'LS'LU
038-ZSWJW
SODQKLWVWDUJHWFHQWHU
3RLQW
038-ZSWJW
SODQPLVVHVWDUJHWFHQWHUE\XVIWDWXVIW0'79'1(
3RLQW
038-ZSWJW
SODQKLWVWDUJHWFHQWHU
3RLQW
038-ZSWJW
SODQKLWVWDUJHWFHQWHU
3RLQW
038-ZSWJW
SODQKLWVWDUJHWFHQWHU
3RLQW
038-ZSWJW
SODQKLWVWDUJHWFHQWHU
3RLQW
038-ZSWJW
SODQKLWVWDUJHWFHQWHU
3RLQW
038-ZSWJW
SODQPLVVHVWDUJHWFHQWHUE\XVIWDWXVIW0'79'1(
3RLQW
038-ZSWJW
SODQPLVVHVWDUJHWFHQWHUE\XVIWDWXVIW0'79'1(
3RLQW
038-ZSWJW
SODQPLVVHVWDUJHWFHQWHUE\XVIWDWXVIW0'79'1(
3RLQW
038-ZSWJW
SODQKLWVWDUJHWFHQWHU
3RLQW
038-ZSWJW
SODQPLVVHVWDUJHWFHQWHUE\XVIWDWXVIW0'79'1(
3RLQW
038-ZSWJW
SODQPLVVHVWDUJHWFHQWHUE\XVIWDWXVIW0'79'1(
3RLQW
038-ZSWJW
SODQKLWVWDUJHWFHQWHU
3RLQW
038-ZSWJW
SODQKLWVWDUJHWFHQWHU
3RLQW
038-ZSWJW
SODQPLVVHVWDUJHWFHQWHUE\XVIWDWXVIW0'79'1(
3RLQW
038-ZSWJW
SODQKLWVWDUJHWFHQWHU
$0 &203$66%XLOG(3DJH
3URMHFW
&RPSDQ\
/RFDO&RRUGLQDWH5HIHUHQFH
79'5HIHUHQFH
6LWH
+LOFRUS$ODVND//&
0LOQH3RLQW
03W-3DG
6WDQGDUG3URSRVDO5HSRUW
:HOO
:HOOERUH
3ODQ038-
038-
6XUYH\&DOFXODWLRQ0HWKRG0LQLPXP&XUYDWXUH
DVEXLOWUNE#XVIW
'HVLJQ038-ZS
'DWDEDVH1257+86&$1$'$
0'5HIHUHQFHDVEXLOWUNE#XVIW
1RUWK5HIHUHQFH
:HOO3ODQ038-
7UXH
3RLQW
9HUWLFDO
'HSWK
XVIW
0HDVXUHG
'HSWK
XVIW
&DVLQJ
'LDPHWHU
+ROH
'LDPHWHU
1DPH
&DVLQJ3RLQWV
[
[
0HDVXUHG
'HSWK
XVIW
9HUWLFDO
'HSWK
XVIW
'LS
'LUHFWLRQ
1DPH /LWKRORJ\
'LS
)RUPDWLRQV
9HUWLFDO
'HSWK66
8*B0%
6%B1$
6%B1%
8*B/$
69
%DVH3HUPDIURVW
69
0HDVXUHG
'HSWK
XVIW
9HUWLFDO
'HSWK
XVIW
(:
XVIW
16
XVIW
/RFDO&RRUGLQDWHV
&RPPHQW
3ODQ$QQRWDWLRQV
6WDUW'LU
0'
79'
(QG'LU
0'
79'
6WDUW'LU
0'
79'
(QG'LU
0'
79'
%HJLQ*HRVWHHULQJ
7RWDO'HSWK
0'
79'
$0 &203$66%XLOG(3DJH
&OHDUDQFH6XPPDU\$QWLFROOLVLRQ5HSRUW2FWREHU+LOFRUS$ODVND//&0LOQH3RLQW03W-3DG3ODQ038-038-038-ZS5HIHUHQFH'HVLJQ03W-3DG3ODQ038-038-038-ZS&ORVHVW$SSURDFK'3UR[LPLW\6FDQRQ&XUUHQW6XUYH\'DWD+LJKVLGH5HIHUHQFH:HOO&RRUGLQDWHV1(
1
:'DWXP+HLJKWDVEXLOWUNE#XVIW6FDQ5DQJHWRXVIW0HDVXUHG'HSWK*HRGHWLF6FDOH)DFWRU$SSOLHG9HUVLRQ%XLOG(6FDQ5DGLXVLV8QOLPLWHG&OHDUDQFH)DFWRUFXWRIILV8QOLPLWHG0D[(OOLSVH6HSDUDWLRQLVXVIW*/2%$/),/7(5$33/,('$OOZHOOSDWKVZLWKLQ
RIUHIHUHQFH6FDQ7\SH6FDQ7\SH
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
0.001.002.003.004.00Separation Factor0 275 550 825 1100 1375 1650 1925 2200 2475 2750 3025 3300 3575 3850 4125 4400 4675 4950 5225Measured Depth (550 usft/in)MPJ-27MPJ-07MPH-18L2MPJ-03MPJ-12MPJ-09MPJ-18No-Go Zone - Stop DrillingCollision Avoidance RequiredCollision Risk Procedures Req.WELL DETAILS:Plan: MPU J-46 NAD 1927 (NADCON CONUS)Alaska Zone 0432.60+N/-S +E/-W Northing EastingLatitudeLongitude0.000.006014759.43552123.7170° 27' 3.8209 N149° 34' 29.0052 WREFERENCE INFORMATIONCo-ordinate (N/E) Reference:Well Plan: MPU J-46, True NorthVertical (TVD) Reference:as built rkb @ 66.30usftMeasured Depth Reference:as built rkb @ 66.30usftCalculation Method:Minimum CurvatureSURVEY PROGRAMDate: 2024-04-24T00:00:00 Validated: Yes Version: Depth From Depth To Survey/PlanTool33.70 1500.00 MPU J-46 wp06 (MPU J-46) GYD_Quest GWD1500.00 5100.00 MPU J-46 wp06 (MPU J-46) 3_MWD+IFR2+MS+Sag5100.00 16877.67 MPU J-46 wp06 (MPU J-46) GYD_Quest GWD0.0030.0060.0090.00120.00150.00180.00Centre to Centre Separation (60.00 usft/in)0 275 550 825 1100 1375 1650 1925 2200 2475 2750 3025 3300 3575 3850 4125 4400 4675 4950 5225Measured Depth (550 usft/in)MPJ-27MPJ-07MPJ-07MPU J-47 wp03 MPJ-13MPJ-12MPJ-06MPU J-44MPJ-09MPU J-40MPU J-40 wp10MPJ-05NO GLOBAL FILTER: Using user defined selection & filtering criteria33.70 To 16878.42Project: Milne PointSite: M Pt J PadWell: Plan: MPU J-46Wellbore: MPU J-46Plan: MPU J-46 wp06Ladder / S.F. Plots1 of 2CASING DETAILSTVD TVDSS MD Size Name3956.19 3889.89 5100.00 9-5/8 9 5/8" x 12 1/4"4240.30 4174.00 16877.67 4-1/2 4 1/2" x 8 1/2"
&OHDUDQFH6XPPDU\$QWLFROOLVLRQ5HSRUW2FWREHU+LOFRUS$ODVND//&0LOQH3RLQW03W-3DG3ODQ038-038-038-ZS5HIHUHQFH'HVLJQ03W-3DG3ODQ038-038-038-ZS&ORVHVW$SSURDFK'3UR[LPLW\6FDQRQ&XUUHQW6XUYH\'DWD+LJKVLGH5HIHUHQFH:HOO&RRUGLQDWHV1(
1
:'DWXP+HLJKWDVEXLOWUNE#XVIW6FDQ5DQJHWRXVIW0HDVXUHG'HSWK*HRGHWLF6FDOH)DFWRU$SSOLHG9HUVLRQ%XLOG(6FDQ5DGLXVLV8QOLPLWHG&OHDUDQFH)DFWRUFXWRIILV8QOLPLWHG0D[(OOLSVH6HSDUDWLRQLVXVIW*/2%$/),/7(5$33/,('$OOZHOOSDWKVZLWKLQ
RIUHIHUHQFH6FDQ7\SH6FDQ7\SH
0LOQH3RLQW+LOFRUS$ODVND//&$QWLFROOLVLRQ5HSRUWIRU3ODQ038-038-ZS&RPSDULVRQ:HOO1DPH:HOOERUH1DPH'HVLJQ#0HDVXUHG'HSWKXVIW0LQLPXP'LVWDQFHXVIW(OOLSVH6HSDUDWLRQXVIW#0HDVXUHG'HSWKXVIW&OHDUDQFH)DFWRU6FDQ5DGLXVLV8QOLPLWHG&OHDUDQFH)DFWRUFXWRIILV8QOLPLWHG0D[(OOLSVH6HSDUDWLRQLVXVIW6LWH1DPH6FDQ5DQJHWRXVIW0HDVXUHG'HSWK&ORVHVW$SSURDFK'3UR[LPLW\6FDQRQ&XUUHQW6XUYH\'DWD+LJKVLGH5HIHUHQFH5HIHUHQFH'HVLJQ03W-3DG3ODQ038-038-038-ZS0HDVXUHG'HSWKXVIW6XPPDU\%DVHGRQ0LQLPXP6HSDUDWLRQ:DUQLQJ03W(3DG03(03(03( &OHDUDQFH)DFWRU 3DVV03(03($03($ &OHDUDQFH)DFWRU 3DVV03(03(/03(/ &OHDUDQFH)DFWRU 3DVV03(03(/3%03(/3% &OHDUDQFH)DFWRU 3DVV03(03(3%03(3% &OHDUDQFH)DFWRU 3DVV03(03(3%03(3% &OHDUDQFH)DFWRU 3DVV03W*3DG03*03*03* &HQWUH'LVWDQFH 3DVV03*03*03* (OOLSVH6HSDUDWLRQ 3DVV03*03*03* &OHDUDQFH)DFWRU 3DVV03*03*03* &OHDUDQFH)DFWRU 3DVV03*03*03* (OOLSVH6HSDUDWLRQ 3DVV03*03*03* &HQWUH'LVWDQFH 3DVV03*03*03* (OOLSVH6HSDUDWLRQ 3DVV03*03*03* &OHDUDQFH)DFWRU 3DVV03*03*03* &HQWUH'LVWDQFH 3DVV03*03*03* (OOLSVH6HSDUDWLRQ 3DVV03*03*03* &OHDUDQFH)DFWRU 3DVV03W+3DG03+03+$03+$(OOLSVH6HSDUDWLRQ)$,/03+03+$03+$&OHDUDQFH)DFWRU)$,/03+03+$03+$&HQWUH'LVWDQFH)$,/03+03+03+ &OHDUDQFH)DFWRU 3DVV03+03+/03+/ (OOLSVH6HSDUDWLRQ 3DVV03+03+/03+/ &OHDUDQFH)DFWRU 3DVV2FWREHU &203$663DJHRI
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
0.001.002.003.004.00Separation Factor5200 5850 6500 7150 7800 8450 9100 9750 10400 11050 11700 12350 13000 13650 14300 14950 15600 16250 16900 17550Measured Depth (1300 usft/in)MPG-01MPJ-07MPH-13AMPG-02MPU J-47 wp03MPH-19MPU J-45MPG-09No-Go Zone - Stop DrillingCollision Avoidance RequiredCollision Risk Procedures Req.WELL DETAILS:Plan: MPU J-46 NAD 1927 (NADCON CONUS)Alaska Zone 0432.60+N/-S +E/-W Northing EastingLatitudeLongitude0.000.006014759.43552123.7170° 27' 3.8209 N149° 34' 29.0052 WREFERENCE INFORMATIONCo-ordinate (N/E) Reference:Well Plan: MPU J-46, True NorthVertical (TVD) Reference:as built rkb @ 66.30usftMeasured Depth Reference:as built rkb @ 66.30usftCalculation Method:Minimum CurvatureSURVEY PROGRAMDate: 2024-04-24T00:00:00 Validated: Yes Version: Depth From Depth To Survey/PlanTool33.70 1500.00 MPU J-46 wp06 (MPU J-46) GYD_Quest GWD1500.00 5100.00 MPU J-46 wp06 (MPU J-46) 3_MWD+IFR2+MS+Sag5100.00 16877.67 MPU J-46 wp06 (MPU J-46) GYD_Quest GWD0.0030.0060.0090.00120.00150.00180.00Centre to Centre Separation (60.00 usft/in)5200 5850 6500 7150 7800 8450 9100 9750 10400 11050 11700 12350 13000 13650 14300 14950 15600 16250 16900 17550Measured Depth (1300 usft/in)NO GLOBAL FILTER: Using user defined selection & filtering criteria33.70 To 16878.42Project: Milne PointSite: M Pt J PadWell: Plan: MPU J-46Wellbore: MPU J-46Plan: MPU J-46 wp06Ladder / S.F. Plots2 of 2CASING DETAILSTVD TVDSS MD Size Name3956.19 3889.89 5100.00 9-5/8 9 5/8" x 12 1/4"4240.30 4174.00 16877.67 4-1/2 4 1/2" x 8 1/2"
Revised 7/2022
TRANSMITTAL LETTER CHECKLIST
WELL NAME: ______________________________________
PTD: _____________________________________________
___ Development ___ Service ___ Exploratory ___ Stratigraphic Test ___ Non-Conventional
FIELD: __________________________ POOL: ____________________________________
Check Box for Appropriate Letter / Paragraphs to be Included in Transmittal Letter
CHECK OPTIONS TEXT FOR APPROVAL LETTER
MULTI
LATERAL
(If last two digits
in API number are
between 60-69)
The permit is for a new wellbore segment of existing well Permit
Number _____________, API Number 50-______________________.
Production from or injection into this wellbore must be reported under
the original API Number stated above.
Spacing
Exception
The permit is approved subject to full compliance with 20 AAC 25.055.
Approval to produce or inject is contingent upon issuance of a
conservation order approving a spacing exception. The Operator
assumes the liability of any protest to the spacing exception that may
occur.
Dry Ditch Sample
All dry ditch sample sets submitted to the AOGCC must be in no greater
than 30-foot sample intervals from below the permafrost or from where
samples are first caught and 10-foot sample intervals through target
zones.
Non-
Conventional
Well
Please note the following special condition of this permit: Production or
production testing of coal bed methane is not allowed for this well until
after the Operator has designed and implemented a water-well testing
program to provide baseline data on water quality and quantity. The
Operator must contact the AOGCC to obtain advance approval of such
a water-well testing program.
Well Logging
Requirements
Regulation 20 AAC 25.071(a) authorizes the AOGCC to specify types
of well logs to be run. In addition to the well logging program proposed
by the Operator in the attached application, the following well logs are
also required for this well:
Per Statute AS 31.05.030(d)(2)(B) and Regulation 20 AAC 25.071,
composite curves for all well logs run must be submitted to the AOGCC
within 90 days after completion, suspension, or abandonment of this
well, or within 90 days of acquisition of the data, whichever occurs first.
SCHRADER BLUFF OIL
MPU J-46
224-131
MILNE POINT
WELL PERMIT CHECKLISTCompanyHilcorp Alaska, LLCWell Name:MILNE PT UNIT J-46Initial Class/TypeDEV / PENDGeoArea890Unit11328On/Off ShoreOnProgramDEVField & PoolWell bore segAnnular DisposalPTD#:2241310MILNE POINT, SCHRADER BLFF OIL - 525140NA1 Permit fee attachedYes ADL025906 and ADL0255182 Lease number appropriateYes3 Unique well name and numberYes MILNE POINT, SCHRADER BLFF OIL - 525140 - governed by CO 477, 477.0054 Well located in a defined poolYes5 Well located proper distance from drilling unit boundaryNA6 Well located proper distance from other wellsYes7 Sufficient acreage available in drilling unitYes8 If deviated, is wellbore plat includedYes9 Operator only affected partyYes10 Operator has appropriate bond in forceYes11 Permit can be issued without conservation orderYes12 Permit can be issued without administrative approvalYes13 Can permit be approved before 15-day waitNA14 Well located within area and strata authorized by Injection Order # (put IO# in comments) (ForNA15 All wells within 1/4 mile area of review identified (For service well only)NA16 Pre-produced injector: duration of pre-production less than 3 months (For service well only)NA17 Nonconven. gas conforms to AS31.05.030(j.1.A),(j.2.A-D)Yes 20" 129.5# X-52 driven to 158'18 Conductor string providedYes 9-5/8" L-80 47# to BOPF, 9-5/8" L-80 40# to SB reservoir19 Surface casing protects all known USDWsYes 9-5/8" fully cemented from reservoir to surface. Two stage cement job through ported collar.20 CMT vol adequate to circulate on conductor & surf csgYes 9-5/8" fully cemented from reservoir to surface. Two stage cement job through ported collar.21 CMT vol adequate to tie-in long string to surf csgYes 9-5/8" fully cemented from reservoir to surface. Two stage cement job through ported collar.22 CMT will cover all known productive horizonsYes23 Casing designs adequate for C, T, B & permafrostYes Doyon 14 rig has adequate tankage and good trucking support24 Adequate tankage or reserve pitNA This is a grassroots well.25 If a re-drill, has a 10-403 for abandonment been approvedYes Halliburton collision scan shows no close approaches with HSE risk.26 Adequate wellbore separation proposedYes 16" Diverter off 21-1/4" Riser27 If diverter required, does it meet regulationsYes All fluids overbalanced to expected pore pressure.28 Drilling fluid program schematic & equip list adequateYes 1 annular, 3 ram stack tested to 3000 psi.29 BOPEs, do they meet regulationYes 13-5/8" , 5000 psi stack tested to 3000 psi.30 BOPE press rating appropriate; test to (put psig in comments)Yes Doyon 14 has 14 x 3-1/8" manual gate valves, 1 x 3-1/8" manual choke and 1 x 3-1/16" remote hydraulic choke.31 Choke manifold complies w/API RP-53 (May 84)Yes32 Work will occur without operation shutdownNo Monitoring required.33 Is presence of H2S gas probableNA This well is a Oil Development well.34 Mechanical condition of wells within AOR verified (For service well only)Yes Rig will have detection equipment. J-10 had 10ppm H2S (2013).35 Permit can be issued w/o hydrogen sulfide measuresYes Reservoir anticipated to be normally pressured (8.45 ppg EMW). MPD to be employed. Multiple faults expected.36 Data presented on potential overpressure zonesNA37 Seismic analysis of shallow gas zonesNA38 Seabed condition survey (if off-shore)NA39 Contact name/phone for weekly progress reports [exploratory only]ApprADDDate10/24/2024ApprMGRDate10/24/2024ApprADDDate10/23/2024AdministrationEngineeringGeologyGeologic Commissioner:Date:Engineering Commissioner:DatePublic CommissionerDate*&:JLC 10/25/2024