Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout186-033Image Project Well History File Cover Page XHVZE This page identifies those items that were not scanned during the initial production scanning. They are available in the.original file, may be scanned during the rescan activity or are viewable by direct inspection of the file. / ¢~- ~'~- Well History File Identifier Organization (done)-~wwo-Sided RESCAN DIGITAL DATA [] Color items: [] Diskettes, No. TOTAL PAGES: ORGANIZED BY: Grayscale items: [] Other, No/Type Poor Quality Origi hals: Other~~L /~ ~ NOTES: OVERSIZED (Scannable) [] Maps: [] Other items scannable by large scanner OVERSIZED (Non-Scannable) [] Logs of various kinds Other BEVERLY BREN VINCENT SHERYL MARIA LOWELL DATE; /S/ Project Proofing [] Staff Proof By: Date: PROOFED BY: BEVERLY BREN VINCENT SHERYL MARIA LOWELL DATE: lei Scanned(done, IIIIIIIIIIIIIIIIIII PAGES:(~ ~ (at the time of scanning) SCANNED BY: BEVERLY BREN VINCE SI~"~Y~I~MARIA LOWELL ReScanned (done) RESCANNEDBY: BEVERLY BREN VINCENT SHERYL MARIA LOWELL DATE: /S/ General Notes or Comments about this file: PAGES: Quality Checked (done) RevlNOTScanned.v~0d ) STATE OF ALASKA ) ALASKA ÓIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1 a. Well Status: 0 Oil 0 Gas 0 Plugged IBI Abandoned 0 Suspended 0 WAG 20AAC 25.105 20AAC 25.110 21. Logs Run: OIL 1 SFL 1 GR, BHCS 1 GR, LOT 1 CNL-Poro, LOT 1 CNL-Raw, Elect. Propagation RFT Interpretation and Raw Data CASING, LINER AND CEMENTING RECORD SETTING DEPTH MD SETTING DEPTH TVD HOLE lOP IjOTTOM lOP IjOTTOM SIZE Surface 110' Surface 110' 36" Surface 2675' Surface 2675' 17-1/2" Surface 8991' Surface 8483' 12-114" 8756' 9784' 8263' 9210' 8-1/2" o GINJ 0 WINJ 0 WDSPL No. of Completions 2. Operator Name: BP Exploration (Alaska) Inc. 3. Address: P.O. Box 196612, Anchorage. Alaska 99519-6612 4a. Location of Well (Governmental Section): Surface: 1606' FNL, 1692" FEL, SEC. 23, T11 N, R13E, UM Top of Productive Horizon: 33" FSL, 3391' FEL, SEC. 14, T11 N, R13E, UM Total Depth: 2541 FSL, 3538' FEL, SEC. 14, T11 N, R13E, UM 4b. Location of Well (State Base Plane Coordinates): Surface: x- __~~~61 _. y- 5959382 Zone- ASP4 TPI: x- 651727 y- 5960987 Zone- ASP4 Total Depth: x- 651576 y- 5961204 Zone- ASP4 a¥~_..__________________ .___.___________________. a______________________ 18. Directional Survey 0 Yes IBI No 22. CASING SIZE WT. PER FT. Conductor 72# 47# 29# GRADE 20" 13-3/8" 9-518" L-80 L-80 L-80 7" 23. Perforations open to Production (MD + TVD of Top and Bottom Interval, Size and Number; if none, state "none"): None MD TVD MD ~CANNE[ FED 2 8; 200& 26. Date First Production: Not on Production Date of Test Hours Tested Zero Other 5. Date Comp., Susp., or Aband. 12/16/2005 6. Date Spudded 02/13/1986 7. Date T.D. Reached 02/24/1986 8. KB Elevation (ft): 71.9' 9. Plug Back Depth (MD+ TVD) 9741 + 9172 '10. Total Depth (MD+TVD) 9784 + 9210 11. Depth where SSSV set N/A MD 19. Water depth, if offshore N/A MSL 24. S'IZE 4-1/2", 12.6#, L-80 TVD F~.ECEIVED FEB 2 4 2006 1b. ~ell,class:", r.' E C ... a as¡ca wa &t'!J\~· on5. tOt1l11lSS1 In IaII evélopmen xplbra ory o StratigraphicA 18UtVlI:e. 12. Permit to Drill Number 186-033 305-362 13. API Number 50- 029-21543-00-00 14. Well Name and Number: PBU D-27 15. Field 1 Pool(s): Prudhoe Bay Field 1 Prudhoe Bay Pool Ft Ft 16. Property Designation: ADL 028285 17. Land Use Permit: 20. Thickness of Permafrost 19001 (Approx.) CEMENTING RECORD 8 cu yds Concrete 3255 cu ft Permafrost "E', 465 cu ft 575 cu ft Class "G" 340 cu ft Class IG" AMOUNT PULLED TUBING RECORD DEPTH SET (MD) 8808" PACKER SET (MD) 8687' 25. ACID, FRACTURE, CEMENT SQUEEZE, ETC. DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED 9459' Set Whipstock 9460' P&A with 22 Bbls Class "G" PRODUCTION TEST Method of Operation (Flowing, Gas Lift, etc.): N/A OIL-BsL PRODUCTION FOR TEST PERIOD + Flow Tubing Casing Pressure CALCULATED + OIL-BBL Press. 24-HoUR RATE GAs-McF W ATER-BsL CHOKE SIZE GAS-OIL RATIO GAs-McF WATER-BsL OIL GRAVITY-API (CORR) 27. CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water (attach separate sheet, if necessary). Submit core chips; if none, state "none". None Form 10-407 Revised 12/2003 ,0"\ I f l CONTINUED ON REVERSE SIDE RBDMS BFl FE8 2 ,. 2006 G 28. GEOLOGIC MARKERS ) 29. ) FORMATION TESTS NAME MD TVD Include and briefly summarize test results. List intervals tested, and attach detailed supporting data as necessary. If no tests were conducted, state "None". Sag River 9018' 8509' None Shublik A 9049' 8538' Sadlerochit 1 Zone 4 9137' 8620' 30. List of Attachments: Summary of Pre-Rig Work and Daily Drilling Reports 31. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed Terrie Hubble ~ ~. ~ Trtle Technical Assistant Date o-;;Lj R';L/ ex;", PBU 0-27 186-033 305-362 Prepared By Name/Number: Terrie Hubble, 564-4628 Well Number P Drilling Engineer: Barbara Lasley, 564-5126 ermit No.1 Approval No. INSTRUCTIONS GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases In Alaska. ITEM 1a: Classification of Service Wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water Supply for Injection, Observation, or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. ITEM 4b: TPI (Top of Producing Interval). ITEM 8: The Kelly Bushing elevation in feet above mean low low water. Use same as reference for depth measurements given in other spaces on this form and in any attachments. ITEM 13: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00). ITEM 20: True vertical thickness. ITEM 22: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. ITEM 23: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). ITEM 26: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, or Other (explain). ITEM 27: If no cores taken, indicate "None". ITEM 29: list all test information. If none, state "None". Form 10-407 Revised 12/2003 Submit Original Only ) Well: Field: API: Permit: D-27 A Prudhoe Bay Unit 50-029-21543-01-00 205-193 Accept: Spud: Release: Rig: 12/26/05 12/28/05 01/06/06 Nordic #1 PRE-RIG WORK 11/29/05 RAN 3.70 DUMMY WHIPSTOCK TO 9551' (SLM) RKB, CORR. + 29' 9580' MD. 12/12/05 SET BAKER 4.5" X 7" WHIPSTOCK TOP AT 9460", ORIENTED 9 DEG RIGHT OF HIGH SIDE. PROGRAM CALLED FOR 0 - 30 DEGREES LOHS. CONFIRMED NEW ORIENTATION WITH DRILLING ENGINEER PRIOR TO SETTING. 2 RA TAGS LOCATED 10' FROM TOP OF WHIPSTOCK AT 9470'. 12/16/05 BLEED AND FLUID PACK IA WITH DIESEL. RIH WITH 2.25" JOUST BDN. TAGGED WS AT 9473' CTMD. CORRECTED COIL DEPTH TO ELMO OF 9460'. PUH 10' AND FLAG PIPE. LOAD AND FLUID PACK WELL WITH 245 BBLS OF 1% KCL. FOLLOW WITH 100 BBLS OF DIESEL TO ESTABLISH POSITIVE WHP. PUMP 22 BBLS OF 15.8 PPG CLASS 'G' CEMENT. FORCE 7.5 BBLS BELOW WHIPSTOCK (3 BBLS TO PERFS). ATTAINED 1000 PSIG BUMP IN WHP. LAY IN REMAINING CEMENT. RIH CONTAMINATING USING 75 BBLS OF BIOZAN TO 9455'. POOH WASHING ALL JEWELRY WITH 3 PASSES. PT SQUEEZE FOR 6 MINUTES AT 500 PSI (LOST 9 PSI). RIG UP BAKER LEFT-HANDED MILLING BHA TO MILL XN NIPPLE. 12/17/05 RIG UP BAKER LEFT HANDED MILLING BHA WITH 3.8" DIAMOND PARABOLIC MILL. RIH PUMPING XS 1 % KCL TO DISPLACE CT. DRY TAG AT 8791' CTMD. FLAG CT, PUH AND BEGIN MILLING AT 1.5 TO 2.2 BPM. PUMP 312 BBLS OF FLUID WITH 9 STALLS BEFORE PASSING THROUGH XN NIPPLE. RUN THROUGH NIPPLE 3 TIMES NOT ROTATING WITH NO WEIGHT CHANGE TO A MAX DEPTH OF 8820'. POOH PUMPING CT DISPLACEMENT. FREEZE PROTECT WELL FROM 2500' USING 40 BBLS 60/40 METHANOL. BHA INSPECTION SHOWED MILL TO BE IN GAUGE. PASSES A 3.800" GAUGE, DOES NOT PASS A 3.791" GAUGE. RD CTU. PAD OPERATOR NOTIFIED OF WELL CONDITION AND LEFT SI. FINAL WHPS = 0/480/0. WELL READY FOR CTD. JOB COMPLETE. ) ) BP EXPLORATION Operatiøns Summary Report Page 1 _ Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: 0-27 A 0-27 A REENTER+COMPLETE NORDIC CALISTA NORDIC 1 Start: 12/26/2005 Rig Release: 1/6/2006 Rig Number: Spud Date: 12/27/2005 End: Date From - To Hours Task Code NPT Phase Description of Operations 12/25/2005 16:00 - 18:00 2.00 MOB P PRE Pull 2" CT reel out of reel house 18:00 - 20:30 2.50 MOB P PRE Swapped out reel plates to 2-3/8" plates 20:30 - 00:00 3.50 MOB P PRE Changed out BOP's to 2-3/8" elements. Changed out upper combi to 2-3/8" X 3-1/2" VBR and lower pipe slips to 2-3/8" Changed out annular element 12/26/2005 00:00 - 01 :00 1.00 MOB P PRE Prep rig for move to D-27a 01 :00 - 02:00 1.00 MOB P PRE ND BOP stack 02:00 - 04:30 2.50 MOB P PRE PJSM, jack up rig, move off well. PT tree cap to 5000 psi. Move rig to edge of pad. N2ES is moving down the Spine Road to Oxbow Road. 04:30 - 05:00 0.50 MOB P PRE Held PJSM with Crew and BP Security on Rig move hazards 05:00 - 08:30 3.50 MOB P PRE Mobilze rig via Spine Road from DS 13 to DS 14 08:30 - 10:40 2.17 MOB P PRE Stopped at entrance to DS 14. Wating on Nabors 2ES pits to travel from V-Pad to DS10n the Spine 10:40 - 12:00 1.33 MOB P PRE Mobilize rig 12:00 - 12:15 0.25 MOB P PRE Crew change at CPS-1 12:15 - 15:30 3.25 MOB P PRE Mobilize rig Rig arrived on D Pad at 1530 hrs 15:30 - 16:00 0.50 MOB P PRE Rig on D-pad at 1530 hrs. Spotted rig near D-27. Held PJSM and discussed hazards on backing over well 16:00 - 18:00 2.00 MOB P PRE Spotted rig over well and set down. Rig accepted at 1800 hrs 12-26-2005 18:00 - 18:30 0.50 BOPSUPP PRE Held PJSM on RU and associated hazard. 18:30 - 20:30 2.00 BOPSUF P PRE NU BOP Stack 20:30 - 00:00 3.50 BOPSUPP PRE Testing BOPE. Witnessing of BOP test waived by John Crisp AOGCC. RU Berm, spot tiger tank, RU hardlines, test 12/27/2005 00:00 - 02: 15 2.25 BOPSUF P PRE Finished testing BOP's, John Crisp wi AOGCC waived witnessing BOP test 02:15 - 03:30 1.25 RIGU P PRE Finish replacing pins in chain on injector 03:30 - 06:00 2.50 RIGU P PRE RU cable to CT, stab pipe, set packoff, MU CTC 06:00 - 06:45 0.75 RIGU P PRE RU to cut 200 ft CT off to move fatique point out of window and build section Cutting off CT 06:45 - 08:30 1.75 RIGU P PRE Install CTC, pull tested to 40k. set CTC. Loaded CT with 5 bbl MEOH and 55 bbl biozan Vct = 59 bbl with dart. PT inner reel valve 08:30 - 09:00 0.50 RIGU P PRE Spud meeting with crew 09:00 - 10:00 1.00 STWHIP P WEXIT PU window exit BHA. Mills 3.8" No/Go on mill and 2.79" No/Go on string mill 10:00 - 12:00 2.00 STWHIP P WEXIT RIH Tagged GLV # 1 8550 ft, went through, RIH, tagged up at 9475', Up Wt 42 K, 2.5 bpm at 1600 psi 12:00 - 15:00 3.00 STWHIP P WEXIT Time mill cement fl 9475 - 9480.8' at pinch point, motor stalled, made -16.5' correction, top of window at 9464.3' 15:00 - 17:30 2.50 STWHIP P WEXIT Milling window fl 9464.3' to 9470', 400 psi mtr differential, 5 k on bit, drilled formation to 9482', returns showed metal shavings, cement and formation. Worked thru window several times with I without pumps, POH, EOP Flag at 9350' 17:30 - 19:08 1.63 STWHIP P WEXIT POH to BHA 19:08 - 21 :35 2.45 DRILL P PROD1 OOH, check flow, unstab injector head BHA = 66.70 ft with 3 deg bend X-treme motor. Installed DS CTC and pull tested to 37k. PT CTC to 3500 psi Printed: 1/9/2006 9:43: 1 7 AM Legal Well Name: Common Well Name: Event Name: Contractor Name: Rig Name: ) ') Page 2_ BP EXPLORATION OperatioASSummaryReport D-27 A D-27 A REENTER+COMPLETE NORDIC CALISTA NORDIC 1 Start: 12/26/2005 Rig Release: 1/6/2006 Rig Number: Spud Date: 12/27/2005 End: Date From - To Hours Task Code NPT Phase Description of Operations 12/27/2005 21 :35 - 23:30 23:30 - 00:00 12/28/2005 00:00 - 01 :25 01 :25 - 01 :33 01 :33 - 02:10 02:10 - 02:30 02:30 - 03:30 03:30 - 03:45 03:45 - 04:48 04:48 - 05:22 05:22 - 06: 1 0 06:10 - 06:45 06:45 - 08:35 08:35 - 09:10 09:10 - 10:55 10:55 - 12:45 12:45 - 15:15 15:15 - 17:30 17:30 - 19:55 19:55 - 20:00 20:00 - 20: 20:25 - :40 20:40 - 21 :05 1.92 DRILL P 0.50 DRILL P 1.42 DRILL P 0.13 DRILL P 0.62 DRILL P 0.33 DRILL P 1.00 DRILL P 0.25 DRILL P 1.05 DRILL P 0.57 DRILL P 0.80 DRILL P 0.58 DRILL P 1.83 DRILL P 0.58 DRILL 1.75 DRILL 1.83 2050 DRILL P DRILL P DRILL P DRILL P DRILL P 0.42 DRILL P PROD1 RIH with 3 dge motor watching GLM. Shallow hole test at 550 ft Orienter test at 3,700 ft PROD1 Stopped at 9,141 ft to tie-in. Logging the lower Tsad. PROD1 Finished tie-in and completed mud swap Corrected -13.5 ft PROD1 RIH to TOW at 9460 ft. Ran past WS with 19R TF Ttagged bottom at 9,488 ft . ... PROD1 Drilling build section in Zone 2B at 20L TF .... Op = 2.7 bpm at 3058 psi WOB = 1.5k to 3.0k ROP = 10 to 20 fph PROD1 Orient TF around PROD1 Drilling build section in Zone 2B Op = 2.7 bpm at 3,100 psi CTP ROP 10 to 40 FPH Had several stalls at 9,502 ft to 9,503 ft PROD1 Orient TF around from 41 R PROD1 Drilling build section in Zone 2B. Op = 2.7 bpm at 3,100 psi CTP ROP 10 to 40 FPH Vp = 305 bbls Still having several stall . Will drill past the 25N and then re-Iog the RA marker PROD1 Orient TF around PROD1 Drilling build s tion in Zone 2B. TF 71 L. Oriented TF 2 clicks Op = 2.7 b at 3,100 psi CTP ROP 10 40 FPH Vp = 3 bbls PROD1 PROD1 9459 ft TOW 9462 ft RA Marker 9469 ft BOW 9468 ft Orient TF around fl 40R to 43L Drilling build section in Zone 2B. TF 43L wi 2.5 bpm at 3050 psi. Orient TF around fl 21 L to 80L Drilling build section in Zone 2B. TF 88L and 20 L wi 2.5 bpm at 3100 psi. POH to BHA, std back inj. POH wi BHA, download MWD tools, adjust mtr to 1.2 degree bend, PU Res tool, orient MWD to mtr, upload MWD, MHA, CTC, stab Inj RIH wi BHA to bottom Madd Pass fl 9733' - 9500 ft Correct -12.5 ft RIH to drill lateral. Tagged at 9,718.2 ft Orient TF to HS or LHS Drilling Lateral section in Zone 2A. Building TVD to 8,945 ft (27.ft) Op = 2.60 I 2.70 bpm Vp = 292 bbl WOB = 1-2k ROP = 120 to 140 fph. GR at 60API Found HOT at 9590 ft MD 8941 ft TVD To be corrected by Geo later Orieting TF around. Having to PUH to base of WS to get clicks PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 PROD1 Printed: 1/9/2006 9:43: 17 AM @~ r;:¡ '~Œ' " .' . ,¡ 3 ^ ,.!1. i iil. '. .. Ù~], i ..lß\l' I'" . n ~) ,¡,-,)U' \:;:V UÙ" - [".·m~ '. I.r~..~ .. Ii" .;,.::;) U e ¡IÃ' n l~ ;k \ q lL \ U ùbUu r;;1.. '.. í ^, lu\ ! r-'I\ W L,;¡ FRANK H. MURKOWSKI, GOVERNOR AliA~1iA OIL AND GAS CONSERVATION COMMISSION 333 W. 7'" AVENUE, SUITE 100 ANCHORAGE, ALASKA 99501-3539 PHONE (907) 279-1433 FAX (907) 276-7542 Barbara Lasley CT Drilling Engineer BP Exploration (Alaska), Inc. P.O. Box 196612 Anchorage, AK 99519-6612 . /0:;3 \<ff Re: PBU D-27 Sundry Number: 305-362 ~c... D· EC 16 20G5 5CANN~L' ." Dear Ms. Lasley: Enclosed is the approved Application for Sundry Approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. Please provide at least twenty-four (24) hours notice for a representative of the Commission to witness any required test. Contact the Commission's petroleum field inspector at (907) 659-3607 (pager). As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the Commission grants for good cause shown, a person affected by it may file with the Commission an application for rehearing. A request for rehearing is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. A person may not appeal a Commission decision to Superior Court unless rehearing has been requested. Sincerely, Ø4 Cathy P. Foerster Commissioner DATED thisZ.yJ day of November, 2005 Encl. W4 It.. lilt ~ 12cn~ RECEIVED ALASKA OIL AND GAS CONSERVATION COMMISSION NOV 222005 APPLICATION FOR SUNDRY APPROVAL . . 20 AAC 25.280 Alallka Oil &;Uh Cons. Conmsslon e STATE OF ALASKA rAlJll ;~~.{)S e nrLofage 1. Type of Request: III Abandon o Suspend o Operation Shutdown o Perforate o Other o Alter Casing o Repair Well o Plug Perforations o Stimulate o Re-Enter Suspended Well o Change Approved Program o Pull Tubing o Perforate New Pool o Waiver o Time Extension 2. Operator Name: 4. Current Well Class: .. 5. Permit To Drill Number BP Exploration (Alaska) Inc. 181 Development 0 'PloratOry 184M)33 /' 3. Address: o Stratigraphic o Service 6. API Number: P.O. Box 196612, Anchorage, Alaska 99519-6612 50- 029-21543-00-00 / 7. KB Elevation (ft): 71.9' 9. Well Name and Number: PBU D·27 / 8. Property Designation: 10. Field / Pool(s): ADL 028285 Prudhoe Bay Field / Prudhoe Bay Pool 11, .... J " >X>'·! ,.x..··"· . ...-- ....... Total Depth MD (ft): Total Depth TVD (ft): I Effective Depth MD (ft): Effective Depth TVD (ft): Plugs (measured): Junk (measured): 9784 9210 9741 9172 None None Casino Length Size MD / TVD Burst ColISDse Rtrllctllr~1 110' 20" 110' 110' SUrf~CA 2675' 13-3/8" 2675' 2675' 4930 2670 8991' 9-5/8" 8991' 8483' 6870 4760 LinAr 1028' 7" 8756' - 9784' 8263' - 9210' 8160 7020 Perforation Depth MD (ft): I Perforation Depth TVD (ft): I Tubing Size: ( Tubing Grade: I Tubing MD (ft): 9555' - 9597' 9005' - 9043' 4-1/2", 12.6# L-80 8808' Packers and SSSV Type: 9-5/8" x 4-1/2" TIW packer Packers and SSSV MD (ft): 8687' 12. Attachments: 13. Well Class after proposed work: 181 Description Summary of Proposal o BOP Sketch o Exploratory 1m Development o Service o Detailed Operations Program 14. Estimated Date for Decemb/ J005 15. Well Status after proposed work: / Commencing Operations: o Oil o Gas o Plugged 181 Abandoned 16. Verbal Approval: Date~ o WAG DGINJ DWINJ o WDSPL Commission Representative: 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Barbara Lasley. 564-5126 Printed Name Barbara Lasley Title CT Drilling Engineer Sianatura". flt.L. YJ1%~ Il II ÞJ/fir Prepared By Name/Number: Phone 564-5126 Date Terrie Hubble, 564-4628 1..../ ( Commission Use Only ) I Sundry Number~~ -: ~ () "":J Conditions of approval: Notify Commission so that a representative may witness ( . lU~ o Plug Integrity o BOP Test o Mechanical Integrity Test o Location Clearance 114 (l [:0,.- yv"'/ ir LJ M.J~' J ...., Çz tG' 11 ~~/( i>uZ II 1) - 27 It" . Other: 1\7 )jr' ì (.. ID {Ol t-w7 I I {i Subsequent Form Required: iC - 40'7. Approved Byæ ø_ .J APPROVED BY Date !J - 1,,3-(¡5- COMMISSIUNER THE COMMISSION Form 10-403 Revised r¡t/200fJ ~. t) Сn~ )8 {\6>V Submit In Duplicate ORIGINAL, N .- e e Obp To: Winton Aubert, Petroleum Engineer Alaska Oil & Gas Conservation Commission From: Barbara M. Lasley, CTD Engineer Date: November 18, 2005 Re: Prep Prudhoe D-27 for CTD sidetrack Sundry approval is requested to prepare D-27 for a sidetrack. This well was originally completed in March, 1996. During its time in service, D-27 has been serviced many times including, adperfs, reperfs, acid stimulations, and cement squeezes, attempting to keep the well competitive. This sidetrack will allow for increased oil rate with minimum gas production. The sidetrack, D-27A, is scheduled to be drilled by Nordic 1 during the first week of January. The plan calls for running a CIDP above the existing perforations prior to setting a whipstock for an exit into Zone 2B. D-27 A will target Zone 2A production. The following describes work planned and is submitted as an attachment to Form 10- 403. A schematic diagram of the proposed sidetrack is attached for reference. Pre-IDS! Work 1. Set DGL V 2. MITIA passed to 3000 psi. 3. MITOA passed to 2000 psi. 4. Pressure test tree/valves 5. Dummy whipstock drift 6. Set CIDP with top at 9480' MD (25 deg inc). 7. Set Baker 4-112" x 7" Thru- Tubing retrievable whipstock. a. TOWS at 9455',30 deg LOHS (15 - 30 LOHS acceptable). 8. Bleed gas lift and production flowlines down to zero and blind flange 9. Remove wellhouse, level pad. The pre CTD work is slated to begin approximately Dec 5. 2005. -rW <¡;. \ D - 4 û ~ ('1-"' ì) JV'''¡'' r Done 10/29/05 Done 10/29/05 Done 11/02/05 IDS! Work 1. MIRU Nordic 1 and test BOPE. 2. Mill 3.725' XN nipple to 3.8" 3. Mill 3.80" window in Zone 2B. 4. Drill sidetrack into Zone 2A target with Resistivity logging. 5. Run solid liner and cement. 6. Cleanout liner, cased-hole log, and perforate. 7. Freeze protect well and RDMO. Post-IDS! Work 1. Install well house. Hook up flow line. Barbara M. Lasley 2 / ;u'.4,-f / CTD Drilling Engineeð~ ~ 564-5126 CC: Well File Sondra Stewmantrerrie Hubble e e TREE = 4"Cm W8...LHEAD = FMC D-27 / SAFETY NOTES: WARNING: LEAKlNG9-SI8" PKR ACTUATOR = AX8...S0N AND SEAL ASSY @ 8690' & 8670' MKB. KB. 8...EV = 71.9' BF. 8...EV = 42.8' KOP= 3500' 2073' 4-1/2" OTIS SSSV NIP, ID = 3.813" I Max Angle = 30 @ 6451' ., Datum MD = 9408' Datum TVD = 8800' GAS LIFT MANDR8...S -µ ~ ST II.«) TVD DEV lYÆ VLV LATCH PORT DATE 113-318" CSG, 72#, L80,ID= 12.347" 2675' 6 3002 2930 4 OTIS-LBD RA 5 5063 4854 28 OTlS-LBD RA 4 6460 6090 30 OTIS-LBD RA L 3 7350 6889 22 OTIS-LBD RA 2 8123 7607 24 OTIS-LBD RA 1 8545 7994 22 OTlS-LBD RA I Minimum ID = 3,,725" @ 8775' I 4-112" OTIS XN NIPPLE 8614' 4-1/2" OTIS XA SLÐNG SL v, 10 = 3.813" I I I i :J 8672' TBG SEAL ASSY I 1\1 :8 .,..", 8687' 9-518" x 4-1/2" TlW PKR. Ð = 4.75" I ....... 8736' 4-1/2" OTIS X NIP, 10= 3.813" I I TOP OF 7" LNR 8756' I 8775' 4-1/2" OTIS XN NIP, ID = 3.725" I 4-1/2"TBG, 12.6#, L-80, .0152 bpI, Ð = 3.958" 8808' 8808' 4-1/2"TBG TAL Ð= 3.958" 9-5/8" CSG. 47#, L-80, Ð = 8.681" 8991' 1----4 ~ I 8804' H 8...MD IT - LOGGED 03/23/861 PERFORA llON SUMMARY REF LOG: SWS-BHCS ON 02124/86 9434' MARKERJONT I ANGLEAT TOP PERF: 26 @ 9508' Note: ReIer to Production DB lor historical perl data SIZE SPF NTER\I AL Opn/Sqz DATE 3-3/8" 4 9508 - 9539 S 05130/95 3-3/8" 12 9539 - 9560 S 05/30/95 3-3/8" 4 9555 - 9574 0 OS/28/95 3-3/8" 6 9582 - 9597 0 OS/28/95 I I PBìD 9741' 17" LNR, 29#, L-80, .0371 bpI, 10 = 6.184" 9784' DATE REV BY COMMENTS DATE REV BY COMVIENTS PRUDHOE BAY UNIT 03101/86 ORIGINAL COMPLETION W8...L: 0.27 02107/01 SIS-SL T CONVERTED TO CANVAS ÆRMITNo: 1860330 03/08/01 SIS-LG FINAL API No: 50-029-21543-00 05/19/01 RN'TP CORRECTIONS SEC23. T11N, R13E, 07/09/03 CMOITLP MAX ANGLE CORRECTION BP Exploration (Alaska) SAÆTYNOTES: WARNING: lEAKlNG9-S/8" PKR AND SEAL ASSY @ 8690' lit 8610' MIœ. 9-518" CSG, 47#, L-80, ID = 8.681" 4-1/2' OTIS SSSV NIP, ID = 3.813' 13-3/8' CSG, 72#, L80, OTIS-LBD 8614' 4-1/2" OTIS XA SLIDING SLV, ID= 3.813" 8672' TBG SEAL ASSY 9-5/8" X 4-1/2" TIW PKR, ID = 4.75" 8136' 4-1/2' OTIS X NIP, ID= 3.813" 4-1/2' TBG, 12.6#, L-80, .0152 bpf, ID = 3.958" PERFORA TIDN SUMMARY REf LOG: SWS-BHCS ON 02/24/86 ANGLE AT TOP PERF: 26 @ 9508' Note: SIZE 3-3/8" 3-318" 3-3/8" 3-3/8" 9141' 9784' PRUDHOE BA Y UNIT WB.L: D-27 PERMIT No: 1860330 API No: 50-029-21543-00 SEC23, T11N, R13E, Ell' Exploration (Alaska) IS , 10 4 10 16 1d 1d 1006 87 SB 89 00 m æ œ 04 05 e 100)) 100) :e Ræe 01 :¡;¡ Case N!:m;¡ .Case1 -0 b :0 Ô Di @;. 100 q i!J tí ' 1Q13112Xl5 '" Ie ' fJèI::JJI2JYJ7 a: ð Ern R.!te : 33!H:t!ld Am , 1001I2Xl5 . 247.924fV1:t: 10 : 6176.97fV1:t: . R.!te 1 o 1500 ;ox¡ 4500 001) 7500 o..m Ot Atd, fVI:t: MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission TO: THRU: Julie Heusser, ~4 CommissiOner Tom Maunder, ~t'/~Q~~ P. I. Supervisor DATE: April 20, 2001 FROM: Chuck Scheve; SUBJECT: Petroleum Inspector Safety Valve Tests Prudhoe Bay Unit D Pad Friday, Apri! 20, 200!; I traveled to BPXs D Pad and witnessed the semi annual safety valve system testing. As the attached AOGCC Safety Valve System Test Report indicates I witnessed the testing of 20 wells and 40 components with 1 failure. The surface safety valve on well D-06 had a slow leak when pressure tested. This valve was serviced and the retest witness~ On this date. Merv Liddiow performed the testing today; he demonstrated good test procedures and was a pleasure to work with. A walk through inspection of the well houses on this pad was performed during the SVS testing with no problems noted. All well houses inspected were reasonably clean and all equipment appeared to be in fair conditions. .S,u,,,rnmarv:, I witnessed the semi annual SVS testing at BPXs D-Pad. PBU D Pad, 2Owe115, 40 components, 1 failure 2.5% failure rate 25 wellhouse inspections Attachment: SVS PBU D Pad 4-20-01 CS X., Unclassified Confidential (Unclassified if doc. removed ) Confidential SVS PBU D Pad 4-20-01 CS Alaska Oil and Gas Conservation Commission Safety Valve System Test Report Operator: BPX Operator Rep: Merv Liddelow AOGCC Rep: Chuck Scheve Submitted By: Chuck Scheve Field/Unit/Pad: Prudhoe/PBU / D Pad Separator psi: LPS 154 Date: 4/19 & 4/20 HPS 660 Weft Permit Separ Set L/P Test Test Test Date Oil, WAG, GIN J, Number Number PSI , PSI Trip Code Co,de Code Pgssed GAS or CYCLE D-01A 1970780 154 125 125 P P OIL D-03A 2001340 154 125 125 P P OIL , D-04A 1871250 D-05 1700060 660 550 450 P ' P ' '0IL D-06A 1970430 660 550 600 P 4 OIL! D207A 1931570 660 550 525 P P ........ 4/20/0'1 OIL D-08 1790360 D-09A 1990850 660 550 525 P ' P OIL D-10 1790530 660 550 525 P P OIL D-11A 1951830 660 550 525 P e OIL D-12 1800150 660 550 530 P P OIL D-13A 2000810 ' ' · D-14A 1961530 , D-15A 1972120 D-16 1811710 660 550 '500 P P ''' OIL D-17A '1960460 ........ D-la "1811880 "' D-26 ~ 1820440 154 125 120: P P' 'OIL D-21 182052'0 154 125 125 P P 'OIL D-22~k '" 1972040 ' D-23A 1961880 660 550 525! P P ' oIL D-24 1852990 ~-25A 2000240 " 154 125 100i P P " ' OIL: D-26A 1970870 660 550 525 e P OIL D-27 1860330 '660 550 550! e p ' " oIL D-28A 1952130 660 550 550 P P OIL D-29 1852530 154 125 110 P P OIL b-30 1960266 .............. D-31A '1'960950 660: 550 '550 'P P "' OIL D-33 1960360 660i 550 550 e P OIL , , , ,, , , RJF 1/16/01 Page 1 of 2 SVS PBU D Pad 4-20-01 CS I Number Wells: Number ! PSI PSI ~20 ComPonents: I ~ I ~l I ~ . · I II / I II I L/P ~;Si "]'"Test I Tesi"!'~' "Dhte' Trip Code I C°del C°del Passed 40 Failures: 1 Failure Rate: Oil, WAG, GIN& GAS or CYCLE 2.50% ~ 90 Day Remarks: The surface, safety, valve on well D-6 had slow leak when press.um,.tested. Valve was serviced and retested same day.. .... ~ : ~- .~ . .... RJF 1/16/01 Page 2 of 2 SVS PBU D Pad 4-20-01 CS MICROFILMED 9/11/00 DO NOT PLACE ANY NEW MATERIAL UNDER THIS PAGE HOWARD OKLAND Attn. ALASKA OIL + GAS CONSERVATION 3001 PORCUPINE DRIVE ANCHORAGE AK, 99501. Date: 17 May 1996 RE: Transmittal of Data Sent by: HAND . CARRY Dear Sir/Madam, Enclosed, please find the dana as described below: WELL # DESCRIPTION ~?. 6W$ N-23 (34-6-11-13) l~-~~ c-04 ~-~)) D-27 (24-14-11-13) 4)-%~{' Y-17A ~A-~) D-22 (42-23-11-13) I °rS~= FINAL BL+RF 1 CCL FINAL BL+RF 1 PLS FINAL BL+RF 1 PLS FINAL BL+RF · 1 CN FINAL BL+RF ECC No. Run ~ i 3065.02 Run ~ 1 4335.05 Run ~ 1 4979.07 Run # 1 6047.03 Run # 1 6091.05 Received by: Please sign and return to: Attn. Rodney D. Paulson Western Atlas Logging Services 5600 B Street Suite 201 / Anchorage, AK 99518 9r FAX t~ (90~) 563-7803 STATE OF ALASKA ALA~''~ OIL AND GAS CONSERVATION COMMISS' --- REPORT SUNDRY WELL OPE.ATIONS 1. Operations performed: Operation shutdown __ Stimulate Plugging__ Pull tubing__ Alter casing Repair well Perforate Other X 2. Name of Operator BP Exploration (Alaska) Inc. 3. Address P. 0. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 1606' SNL, 1692' WEL, SEC. 23, T11N, R13E, UPM At top of productive interval 33' NSL, 1887' EWL, SEC. 14, T11N, R13E, UPM At effective depth 5068' NSL, 3510' EWL, SEC. 14, T11N, R13E, UMI At total depth 253' NSL, 1740' EWL, SEC. 14, T11N, R 13E, UPM 5. Type of Well: Development X Exploratory __ Stratigraphic Service 6. Datum elevation (DF or KB) KBE = 71.91 AMSL 7. Unit or Property name Prudhoe Bay Unit 8. Well number D-27 (24-14-11-13) PBU 9. Permit number/approval number 86-33 / 10. APl number 50- 029-21543 11. Field/Pool Prudhoe 0il Pool feet 12. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical 9784 feet BKB 9210 feet 9673 feet BKB 9111 feet Plugs (measured) Junk (measured) fill at 9689' MD BKB (05/88) Casing Length Size Cemented Measured depth True vertical depth Structural -- BKB Conductor 110 20X30 8 c. y. 139 139 Surface 2646 13 3/8 3720 c.f. 2675 2675 Intermediate 8962 9 5/8 575 c.f. 8991 8483 Production -- Liner 1028 7 340 c.f. 8756-9784 8263-9120 Perforation depth: measured 9583'-9597',9555'-9675', true vertical subsea 8933'-8970'(two intervals Tubing (size, grade, and measured depth) 4 1/2" L-80 to 8687' with 4 1/2" tailpipe to 8808' Packers and SSSV (type and measured depth) 9 5/8" TlW packer at 8687'; 4 1/2" SSSV at 2073' 13. Stimulation or cement squeeze summary See Attachment Intervals treated (measured) Treatment description including volumes used and final pressure 14. Prior to well operation Subsequent to operation Representative Daily Average Production or Injection Data OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure 0 1898 0 2420 0 1888 0 2070 Tubing Pressure 187 234 15. Attachments 16. Status of well classification as: Copies of Logs and Surveys run Daily Report of Well Op~ations Oil X Gas Suspended__ 17. I her~y ~ify th~at the/~regoing i,~.tr .~ a@d correct to the best of my knowledge. S ig n ed ~/~ .~ ?~,,~./Z/~~ Ti~'le TechnicalAssistantlll Form 10-404 Rev 06/15/8~ '"" - Service Date ~--~"//~'~/~ ~" SUBMIT IN DUPLICATE WELL D-27 (24-14-11-13) NRWO (Maraseal) Operation 04/11/95 A NRWO Sandback (Maraseal) was performed using the following fluids below: SUMMARY Bullhead kill well with sea water. Run in hole with 3.250" big hole nozzle. Locate profile nipples with TEL. Made a(-) 37 ft correction. Tied into the jewerly on the CBT log dated 23/3/86. Nozzle now on deoth with E-line. Continue in hole and tag bottom. This tag also on depth with corrected S-line tag. Park nozzle above perforations while BJ is rigging up. BJ mix and pump slurry #1. Lay in 1000 lbs 20/40 carb. (Calculated TOS 9557'). Wait on sand to fall. Tag TOS at 9563'. BJ mix and pump slurry #2. Lay in 450 lbs 20/40 carb and 100 lbs calcium carb. (calculated TOS 9535'). Wait on sand to fall. Tag TOS at 9542'. Wait on sand. Re-tag TOS at 9541'. Pull above perforations and perform injecton test. Final injection rate after 25 bbls. 2 bpm/275 psi. Final tag after injection test, 9539'. Rig down BJ. Start pulling out of hole while freeze protecting coil. Out of hole, close swab valve and remove fusible cap. Cap BOPs. Leave well shut in. Plan to pump MS in AM. BBLS. 325 35 FLUIDS PUMPED _ Sea Water (filtered). (kill well and fluid pack). (inj test). Methanol Slurry #1 BBLS. 3 5 Sea Water 6 Clean Gel (40g gel) 9 Dirty Gel (4 lb/gal sand mixed in a 40 lb gel) Slurry #2 BBLS. 3 5 Sea Water 6 Clean Gel (40g gel) 4 Dirty Gel (4 lb/gal sand mixed in a 40 lb gel, 100 lbs cal carb added). 5/3 0/9 5 Repaired wing valve. Checked inj while RIH at approx .5 BPM/1700 psi. Did not tag bottom for fear of green cement. Cooled perfs w/a total of 283 bbls. Pumped 12 bbls acid. Post acid injectivity was 1 BPM/335 psi, 2 BPM/960 psi. Over displaced acid with 25 bbls. FLUIDS PUMPED 180 FSW bullhead kill and cool down 103 Over~splace acid, flush coil, cool above peffs ~ t~::~ :~ ~ 21 ~ spacer LARRY GRANT Attn. ALASKA OIL + GAS CONSERVATION 3001 PORCUPINE DRIVE ANCHORAGE AK, 99501. Date: 7 July 1995 RE: Transmittal of Data Sent by: PRIORITY MAIL Dear Sir/Madam, Enclosed, please find the data as described below: WELL DESCRIPTION 1PLS FINAL BL+RF 1 PLS FINAL BL+RF 1 PLS FINAL BL+RF 1 PLS FINAL BL+RF ECC No. Run # 1 3576.04 Run # 1 4979.06 Run # ! 5833.07 Run # ! 6451.00 Please szgn and return to Att Rodney D Paulson ' : Atla~ Wireline'S~' ~ 5600 ~ Str~/ /A'h'~orage, AK ~518 ~ / Or ~AX to (~7) 563-7803 Received by:~~ ~ ,~~ Date: LARRY GRANT Attn. ALASKA OIL + GAS CONSERVATION 3001 PORCUPINE DRIVE ANCHORAGE AK, 99501. Date: 8 May 1995 RE: Transmittal of Data Sent by: PRIORITY MAIL Dear Sir/Madam, Enclosed, please find the data as described below: WELL f DESCRIPTION 1 PLS FINAL BL+RF 1 PFC/PERF FINAL BL+RF 1 PLS FINAL BL+RF 1 PLS FINAL BL+RF 1 PFC/PERF FINAL BL+RF 1 PFC/PERF FINAL BL+RF 1 PLS FINAL BL+RF ECC No. Run # 1 1546.03 Run # 1 3820.04 Run # 1 4966.03 Run # 1 4979.05 Run # 1 5633.04 Run # 1 5751.06 Run # 1 6245.03 Please sign and return to: Attn. Rodney D. Paulson Atlas Wireline Services 5600 B Street Suite 201 Anchorage, AK- 99518 Or FAX to (907) 563-7803 Received by: Date: Please sign and ~etu~ Petrotechntcal Da%a Cente~ 8P Exploration (Alaska) In~ 900 E~st Eenson Boulevard LARRY GRANT Attn. ALASKA OIL + GAS CONSERVATION 3001 PORCUPINE DRIVE ANCHORAGE AK, 99501. Date: 16 November 1994 RE: Transmittal of Data Sent by: MAIL Dear Sir/Madam, Enclosed, please find the data as described below: WELL ~ DESCRIPTION W-32 (32-16-11-12) /D-14 C-38 (41-18-11-14) 1 PLS STP'FINAL BL 1 PLS STP FINAL RF 1 PLS FINAL BL 1 PLS FINAL RF 1 PLS/GAS ENT. FNL BL 1 PLS/GAS ENT. FNL RF 1 PLS/GAS ENTRY FNL BL 1 PLS/GAS ENTRY FNL RF 1 PLS STP FINAL BL 1 PLS STP FINAL RF J-28 1 PLS FINAL BL 1 PLS FINAL RF W-30 (11-21-11-12) 1 PLS/GAS ENTRY FNL BL 1 PLS/GAS ENTRY FNL RF -- , _ -- Please sign and re~% bo: atlas wireline 5600 B Street Suite 201 Anchorage, AK 99518 Attn. Rodney D. Paulson /j Or FAX to (907) 563-7803 Received by: /~/~ ~fj_~,~J Date: ECC No. Run # 1 Run # 1 2441.05 Run ~ 1 Run ~ 1 3965.02 Run # 1 Run ~ 1 4338.01 Run # 1 Run ~ 1 4979.04 Run # 1 Run # 1 5785.04 Run # 1 Run # 1 6046.01 Run # 1 Run # 1 6228.02 RECEIVED ALASKA OIL & GAS CONSERVATION COMMISSION Attn. LARRY GRANT 3001 PORCUPINE DR. ANCHORAGE AK, 99501. USA Date: Sent by: 21 April 1994 Transmittal of Data Dear Sir/Madam, Enclosed, please find the data as described below: WELL ~ DESCRIPTION 91-)3Q s-34 PLS STATIC FINAL BL 1 PLS ST3~C RF SEPIA Run # 1 Run # 1 51-~q M-09 /PLS STATIC FINAL BL 1 PLS ST~ RF SEPIA Run #' 1 Run # 1 il PLS STATIC FINAL BL /1 PLS STATIC RF SEPIA Run # 1 Run # 1 / PLS STATIC FINAL BL PLS ST~ RF SEPIA Run # 1 Run # 1 qk-~ s-37 (32-35-12-12) /1 PLS STATIC FINAL BL 1 PLS S~C RF SEPIA Run # 1 Run i PLS STATIC FINAL BL /1 PLS S~m'~ ~ SEPIA Run # 1 Run # ~iPLS STATI/J>FINAL BL PLS ST4KTIC RF SEPIA Run # 1 Run ~ 1 ~[_~_~ M-04 (23-31-12-13) 1 PLS STATIC FINAL BL /1 PLS S~HT~C RF SEPIA Run # 1 Run # 1 8 ~-~% R-23 (42-33-12-13 1PLS STATIC FINAL BL PLS STA~C RF SEPIA Run # 1 Run # 1 ~OO U-14 (11-20-11-13) 1 PLS STATIC FINAL BL 1 PLS STATI'C RF SEPIA Run # 1 Run # 1 ~ CN/GR FINAL BL Run # 1 /1CN/GR FINAL RF SEPIA Run # 1 $0--~l F-14 (33-35-12-13) 1PFC/GR/CCL FINAL BL PFC/GR/CCL RF SEPIA Run # i Run # 1 ECC No. 5856.06 2187.03 6169.00 6173.00 5879.06 5617.05 4880.03 2097.05 6102.01 6014.02 5810.02 959.04 Cont/ ~--~ C-38 (41-18-11-14) ~5~ D-27 (24-14-11-13) 1. PFC/PERF FINAL BL /1 PFC/PERF RF SEPIA 1PLS FINAL BL 1 PLS FINAL RF SEPIA Run # 1 5785.02 Run # 1 Run # 1 5132.01 Run # 1 Run # 1 4979.03 Run # 1 Run # 1 6162.00 Run # 1 Run # 1 5783.03 Run # 1 Please sign and return to: Atlas Wireline Services 5600 B Street Suite 201 Anchorage, AK 99518 Attn. Rodney D. Paulson Received by: Date: Please sign and return to: Sonya Wallace (MB 3-3) Petrotechnical Data Center BP Exploration (Alaska) Inc. 900 East Benson Boulevard Anchorage, Alaska 99508 Received by: Date: STATE OF ALASKA AD~_ .,A OIL AND GAS CONSERVATION COMMISb. REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown Stimulate × Plugging Pull tubing Alter casing Repair well Perforate × Other 2. Name of Operator BP Exploration (Alaska) Inc. 3. Address P. O. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 1606' SNL, 1692' WEL, SEC. 23, T11N, R13E, UPM At top of productive interval 33'NSL, 1887'EWL, SEC. 14, T11N, R13E, UPM At effective depth 5068' NSL, 3510' EWL, SEC. 14, T11N, R13E, UMI At total depth 253' NSL, 1740' EWL, SEC. 14, T11N, R13E, UPM 5. Type of Well: Development Exploratory Stratigraphic Service ORIGINAL 6. Datum elevation (DF or KB) KBE = 71.91 AMSL feet 7. Unit or Property name Prudhoe Bay Unit 8. Well number D-27 (24-14-11-13) PBU 9. Permit number/approval number 86-33 / 10. APl number 50- 029-21543 11. Field/Pool Prudhoe Oil Pool 12. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical 9784 feet BKB 9210 feet 9673 feet BKB 9111 feet Plugs (measured) Junk (measured) Casing Length Size Cemented Structural -- Conductor 110 20X30 8 c.y. Surface 2646 13 3/8 3720 c.f. Intermediate 8962 9 5/8 575 c.f. Production -- Liner 1028 7 340 c.f. Perforation depth: measured 9583'-9597',9555'-9675', fill at 9689' MD BKB (05/88) Measured depth 139 2675 8991 8756-9784 True vertical depth BKB 139 2675 8483 8263-9120 true vertical subsea 8933'-8970'(two intervals Tubing (size, grade, and measured depth) 4 1/2" L-80 to 8687' with 4 1/2" tailpipe to 8808' Packers and SSSV (type and measured depth) 9 5/8" TIW packer at 8687~ 4 1/2" SSSV at 2073' RECEIVED 13. Stimulation or cement squeeze summary See Attachment Intervals treated (measured) Treatment description including volumes used and final pressure '-;~'n '1 9 199'~ & Cas Cons. Corrl~nJssior Anchorage 14. Prior to well operation Subsequent to operation Representative Daily Average Production or Injection Dat~ OiI-Bbl ,~. Gas-Mcf Water-Bbl Casing Pressure 0 1898 0 2420 0 1888 0 2070 Tubing Pressure 187 234 15. Attachments Copies of Logs and Surveys run Daily Report of Well Operations 16. Status of well classification as: Oil X Gas Suspended Service 17. I hereby c~rtify that the foreg~ng is true and correct to the best of my knowledge. Signed ~ ~.~"1/%~ Title Senior TechnicalAssistant I Form 10-404 Rev 06/15/88 / Date ~//',~/~ ~ SUBMIT IN DUI~LIC'ATE 6/24/93 7/06/93 9/16/93 WELL D-27(24-14-11-13) Stimulation/Reperf Operation The following interval were reperforated using 3 3/8" guns, 4 SPF, 60° orientation and 120° phasing. 9555' - 9574' MD A HCL CT ACID STIMULATION JOB SUMMARY Ran in with TEL/packer assembly. Got good depth indications in tubing tail and attempted to set packer with center of element at 9549' BKB. Got leakage immediately after shearing DOV. Continued to inflate packer. Packer held wt initially, then gradually deflated. Proceeded to pump acid per program. Pumped at 0.25 BPM down backside during treatment to protect upper squeezed perfs. Kept nozzle at 9564 BKB (mid perfs) while treating with acid. Ran down below lower squeezed perfs before shutting down. Well appeared very tight while RIH. Well injectivity might have improved when seawater on formation. Injectivity declined while treating with acid. Still tight at end of job. FLUID SUMMARY 251 BBLS SEAWATER (130-150 F, with 1% KCI and 0.2% surfactant, including 69 bbl overflush and displacement behind acid.) 46 BBLS 15% HCL WITH 10% XYLENE. The following interval were reperforated using 3 3/8" guns, 6 SPF, random orientation and 60° phasing. 9582' - 9597' MD fjh 12/21/93 RECEIVED APiR 'i 9 i99x+ Cas Cor~s. Commission Anchorage BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard RO. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 DATE: 09/22/93 T# 85045 BPX/PBU~LOGS Enclosed is your copy of the materials listed below. If you have any questions, please contact BP Well Records at (907) 564-4004. A_ 1 3 ,~ %_ 15(~ ~C-c-"lcc~,.., BRIDGE PLUG 09/15/93 A-24 ~A~70 CNA ~ ~j~c%- 09/18/93 A-40 9~-~ PRODUCTION LOGw 09/17/93 C-03 ~~ PRODUCTION LOG ~ 09/15/93 D-09~-~5 ~PE~)~L/~ 09/16/93 D-27 ~-~ ~PE~) ~ ~= 09/16/93 G---07~¥~ PRODUCTION LOG~ 09/14/93 ~-02 9~ ~E~) ~{~ 09/13/93 P-2~_~ ,~ __. _ SBL~G~~ 09/16/93 P-23/Gk/CCL~% 09/16/93 R-01~9 ~E~) ~~~ 09/18/93 S-05 ~-~7 CCL(~~c~ 09/17/93 U-11~ -- SBL/~k~ 09/13/93 U-11BI (PE~) 9g~G~~ 09/14/93 X-02 ~-~ [PE~)~/~U 09/15/93 X-27 ~ CNL/6~cC% 09/18/93 Information Control Well Records 9250.00- 9700.00 ATLAS 5 " 10600.00-11052.00 ATLAS 5 " 9800.00-10196.00 ATLAS 5 " 9800.00-10188.00 ATLAS 5 " 10230.00-10494.00 ATLAS 5 " 9100.00- 9634.00 ATLAS 5 " 11000.00-11356.00 ATLAS 5 " 12480.00-12736.00 ATLAS 5 " 11488.00-12175.00 ATLAS 5 " 11833.00-12100.00 ATLAS 5 " 11488.00-12175.00 ATLAS 5 " 8740.00- 9130.00 ATLAS 5 " 9340.00- 9552.00 ATLAS 5 " 10100.00-11013.00 ATLAS 5 " 10100.00-11013.00 ATLAS 5 " 10200.00-10850.00 ATLAS 5 " 9630.00- 9914.00 ATLAS 5 " 11150.00-11719.00 ATLAS 5 " · OCT 0 4 1998 4~ska Oil & Gas Cons. 4n~orago C°~mission BP EXPLORATION BP Exploration (Alaska) inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 DATE: 07/06/93 T# 84737 BPX/PBUeLOGS Enclosed is your copy of the materials listed questions, please contact BP Well Records at A-3; PERF 0 B-0170'O~ LEAK DET/FM/TEMP 0 B-29%~'lq PDK-100 0 D-27%~- 55 ~E~ 0 D-28~6~ PE~ 0 F-08 PFC 0 H-0!%Ui_t~ PERF 0 H-01' PFC 0 6/20/93 #1 6/24/93 #1 6/23/93 #1 6/24/93 #1 6/22/93 #1 6/21/93 #1 6/23/93 #1 6/24/93 #1 6/20/~3 #1 6/25/93 ~1 6/21/93 ~1 6/25/93 %1 6/27/93 #1 below. If you have any (907) 564-4004. 10400 0 8800 9420 10600 11092 10950 9700 10200 9450 9400 8720 10560 .00-10704 00- 9620 00- 9415 00- 9615 00-10967 00-11228 00-11242 00-10334 00-10900 00-10503 00- 9695 00- 9140 00-11000 .00 ATLAS 5 " 00 ATLAS 5 " 00 ATLAS 5" 00 ATLAS 5 " 00 ATLAS 5 " 00 ATLAS 5 " 00 ATLAS 5 " 00 ATLAS 5 " 00 ATLAS 5 00 ATLAS 5 " 00 ATLAS 5 " 00 ATLAS 5 " 00 ATLAS 5 " Information Control Well Records RECEIVED JUL 1 2.199,3 A~ BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 DATE- 06/03/93 T.% 84630 BPX/PBU~OGS Enclosed is your copy of the materials listed below. If you have any questions, please contact BP Well Records at (907) 564-4004. 8-34 ~S PDK-100 05/31/93 #1 C-37~ ~ PFC 05/27/93 #! D-22~~_ SPINNER/TEHP 05/27/93 #1 G-!6~[~ SP!NNER/TEMP 05/26/93 #1 H-06~O~ PROD-F 05/30/93 #1 H-! PFC 05/29/93 #1 H-!gAg~TPFC 05/28/93 #1 U-04 TUBING CUTTER 05/29/93 #1 11500 00-12058.00 ATLAS 5 " 8800 00- 8900 00 ATLAS 5 !000 00- 9635 00 ATLAS ! ·" 9750 00-10050 00 ATLAS 5 " 9350 00- 9740 00 ATLAS 5 " 7560 00- 9611 00 ATLAS 5 " 9000 00- 9400 00 ATLAS 5 " 9880 00-10360 00 ATLAS 5 " 10800 90-10910 00 ATLAS 5 " Information Con, roi Well Records BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 56~-5~ BP CASED HOLE FINALS DATE: 04/16/92 T# 83419 Enclosed is your copy of the materials listed below. If you have any questions, please contact BP Well Records at (907) 564-4004. 81,~/GAS~ LIFT SURVEY 03/22/92 #1 Y-10 INJ 03/23/92 #1 Y-24~--,13 INJ 03/25/92 #1 D-27 gF-$3 PROD-F 04/01/92 #1 z-07fo-~ GAS LIFT sURvEY 03/25/92 #1 A-16~-/Z~ MISC GAS INJ 03/31/92 #1 A-037/-3~ MISC GAS INJ 03/31/92 #1 F-37~--~ LEAK DET 03/19/92 #1 N-11~'/z~ GAS LIFT SURVEY 03/20/92 #1 F-48 9/--~ TEMP 03/22/92 #1 Y-27~o--~iNj 03/23/92 #1 S-32~0'/g~ PITS 03/24/92 #1 S-0~'~ GAS LIFT SURVEY 03/22/92 #1 A-1181-~gMISC GAS INJ 03126/92 2500.00-12104.00 CAMCO 2 " 9200.00-10123.00 CAMCO 5 " 13100.00-13430.00 CAMCO 5 " 9350.00- 9644.00 CAMCO 5 " 2500.00-12738.00 CAMCO 2 " 10520.00-11084.00 CAMCO 5 " 11600.00-11915.00 CAMCO 5 " 8600.00-10400.00 CAMCO 2 " 2500.00-10200.00 CAMCO 2/5" 0.00- 3000.00 CAMCO 5 " 2500.00- 9920.00 CAMCO 2 " 12900.00-13247.00 CAMCO 5 " 10100.00-10548.00 CAMCO 5 " 2500.00-10674.00 CAMCO 2 " 9750.00-10050.00 CAMCO 5 " Information Control Well Records Adrian J. Martin RECEIVED APR 2 4 1992 Alaska 0ii & G~s Co.s. Commission 0 I ! N AL, ...,KA OIL AND GAS CONSERVATION COMMIS~,,,JN REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown Stimulate x Plugging Pull tubing Alter casing. Repair well Perforate Other 2. Name of Operator BP Exploration (Alaska) Inc. 3. Address P. 0. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 1606' SNL, 1692' WEL, SEC. 23, T11N, R13E, UPM At top of productive interval 33'NSL, 1887' EWL, SEC. 14, T11N, R13E, UPM At effective depth 5068'NSL, 3510'EWL, SEC. 14, T11N, R13E, UM! At total depth 253' NSL, 1740' EWL, SEC. 14, T11N, R13E, UPM 12. Present well condition summary Total depth: measured 9784feet true vertical BKB 9210feet Effective depth: measured 9673feet true vertical BKB 911~feet 5. Type of Well: Development X Exploratory, Stratigraphic Service Plugs (measured) Junk (measured) 6. Datum elevation (DF or KB) KBE= 71.91 AMSL feet 7. Unit or Property name Prudhoe Bay Unit 8. Well number D-27 (24-14-11-13) PBU 9. Permit number/approval number 86-33/90-679 10. APl number 5O- 029-21543 11. Field/Pool Prudhoe Oil Pool fill at 9689'MD BKB (05/88) Casing Length Size Structural -- Conductor 110 20X30 Surface 2646 13 3/8 Intermediate 8962 9 5/8 Production -- Liner 1028 7 Perforation depth: measured 9583'-9597',9555'-9675', Cemented 8 c.y. 3720 c.f. 575 c.f. 340 c.f. Measured depth 139 2675 8991 8756-9784 True vertical depth BKB 139 2675 8483 8263-9120 true vertical subsea 8933'-8970'(two intervals Tubing (size, grade, and measured depth) 4 1/2" L-80 to 8687' with 4 1/2" tailpipe to 8808' Packers and SSSV (type and measured depth) 95/8" TlW packera, 8687'; 41/2" SSS V a, 2073' R E C E IV E D 13. Stimulation or cement squeeze summary 3/27/91 CTU HCL Job Intervals treated (measured) 2/12/91 Add Perf 9564'-9574' 6/13/91 Add Perf 9555'-9574' Treatment description including volumes used and final pressure MAR 1 0 1992 Alaska 0il & 6as Cons. Commission Anchorage 14. Representative Daily Average Production or Injection Data OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation 0 0 0 0 Subsequent to operation 0 0 0 0 15. Attachments 16. Status of well classification as: Copies of Logs and Surveys run .... Daily R~ort of Well Oper~ions Oil X Gas .. Suspended ... 17. l here¢~ertify that, tl~,,.-. ,, ,,,. for/b~oing~, is true and correct to the best of my knowledge. Signed.(7~M~ 7_~" ~ Title Supervisor Gravity Drainage Form 10'-404 Rev 06(/15/88 ¢ Service Date SUBMIT IN DUPLICATE STATE OF ALASKA ALA~.,A OIL AND GAS CONSERVATION COMMISSi~. ~ ~'~ REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown Stimulate x Plugging Pull tubing Alter casing 2. Name of Operator BP Exploration (Alaska) Inc. 3. Address P. O. Box 196612, Anchorage, Alaska 99519-6612 Repair well 5. Type of Well: Development X Exploratory Stratigraphic Service 4. Location of well at surface 1606' SNL, 1692' WEL, SEC. 23, T11N, R13E, UPM At top of productive interval 33' NSL, 1887' EWL, SEC. 14, T11N, R13E, UPM At effective depth 5068' NSL, 3510' EWL, SEC. 14, T11N, R13E, UM! At total depth 253'NSL, 1740'EWL, SEC. 14, T11N, R13E, UPM Perforate Other 6. Datum elevation (DF or KB) KBE= 71.91 AMSL feet 7. Unit or Property name Prudhoe Bay Unit 8. Well number D-27 (24-14-11-13) PBU 9. Permit number/approval number 86-33/90-679 10. APl number 50- 029-21543 11. Field/Pool Prudhoe Oil Pool 12. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical 9784feet BKB 9210feet 9673feet BKB 911/feet Casing Length Size Structural -- Conductor 110 20X30 S u rf ace 2646 13 3/8 Intermediate 8962 9 5/8 Production -- Liner 1028 7 Perforation depth: measured 9583'-9597',9555'-9675', Plugs (measured) Junk (measured) Cemented 8 c.y. 3720 C.f. 575 c.f. 340 c.f. fill at 9689' MD BKB (05/88) Measured depth 139 2675 8991 8756-9784 True vertical depth BKB 139 2675 8483 8263-9120 true vertical subsea 8933'-8970'(two intervals Tubing (size, grade, and measured depth) 4 1/2" L-80 to 8687' with 4 1/2" tallpipe to 8808' Packers and SSSV (type and measured depth) 13. Stimulation or cement squeeze summary 9 5/8" TlW packer at 8687'; 4 1/2" SSSV at 2073' ,~,./'"'~;:~ '~ ~i .. 14. Intervals treated (measured) Treatment description including volumes used and final pressure Representative Daily Average Production or Iniection Data OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure Prior to well operation 0 0 0 0 Subsequent to operation 270 ~ 1065 .~' 10 ,-~ 1800 Tubing Pressure 0 170 15. Attachments 16. Status of well classification as: Copies of Logs and Surveys run Daily Rep~rt of Well Operations Oil × Gas Suspended 17.1 hereby,~'tify that th,~ol~ing is true and correct to the best of my knowledge. Signed y,~¢_~- ----'7~~ Title Supervisor Gravity Drainage Form 10-404 Rev 06/lS/88 c/ Service Date///"/~' -~// SUBMIT IN DUPLICATE WELL D-27 WELL (24-14-11-13) OPERATIONS PBU 1/03/91 2/12/91 3/24/91 6/13/91 mtp 1 O/2O/91 CTU GSO Reperf 9564'-9574' MD BKB CTU Packer HCL job. Add perf 9555'-9574 mr/11/5/91 BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard RO, Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 TO: DISTRIBUTION Date :06/17/91 T# :82519 FROM' Information Control Well Records LR2-1 SUBJECT: BP CASED HOLE FINALS Enclosed is your copy of the matedal listed below. If you have any questions, please contact BP Well Records at (907) 564-4445. D-06 CCL 06/14/91 #1 9180-9435 Atlas 5" :' D-27 CCL 06/13/91 #1 9350-9630 Atlas 5" M-15 CCL 06/15/91 #1 8000-8240 Atlas 5" M-15 CL 06/09/91 #1 8026-8316 Atlas 5" N-14 CL 06/09/91 #1 9428-9718 Atlas 5" Distribution: ARCO CHEVRON EXXON GEOSCIENCES MOBIL PHILLIPS RESERVOIR STATE OF ALASKA ARCHIVES RECEIVED JUN 2 5 199! 0il & Gas Cons. Commission Anchorage STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown Stimulate x Plugging Pull tubing 2. Name of Operator BP Exploration (Alaska) Inc. Alter casing 3. Address P. O. Box 196612, Anchorage, Alaska 99519-6612 Repair well 5. Type of Well: Development X Exploratory Stratigraphi¢ Service Perforate X Other 6. Datum elevation (DF or KB) KBE = 71.91 AMSL feet 7. Unit or Property name Prudhoe Bay Unit 4. Location of well at surface 1606' SNL, 1692' WEL, SEC. 23, T11N, R13E, UPM At top of productive interval 33' NSL, 1887' EWL, SEC. 14, T11N, R13E, UPM At effective depth 5068'NSL, 3510'EWL, SEC. 14, T11N, R13E, UMI At total depth 253'NSL, 1740'EWL, SEC. 14, T11N, R13E, UPM 12. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical 9784feet BKB 9210feet 9673feet BKB 911/feet Plugs (measured) Junk (measured) 8. Well number D-27 (24-14-11-13) PBU 9. Permit number/approval number 86-33/ 10. APl number 50- 029-21543 11. Field/Pool Prudhoe Oil Pool fill at 9689' MD BKB (05/88) Casing Length Size Structural -- Conductor 110 20X30 S u rf ace 2646 13 3/8 Intermediate 8962 9 5/8 Production -- Liner 1028 7 Perforation depth: measured 9564'-9574', 9583'-9597' Cemented 8 c.y. 3720 c.f. 575 c.f. 340 c.f. Measured depth 139 2675 8991 8756-9784 true vertical subsea 9013'-9042' (two intervals) Tubing (size, grade, and measured depth) 4 1/2" L-80 to 8687' with 4 1/2" tailpipe to 8808' Packers and SSSV (type and measured depth) 9 5/8" TIWpacker at 8687'; 4 1/2" SSSV at 2073' True vertical depth BKB 139 2675 8483 8263-9120 RECEIVED Alaska Oii & Gas Cons. 6o~g!-[ Anchorag~ 13. Stimulation or cement squeeze summary Intervals treated (measured) See Attachment Treatment description including volumes used and final pressure 14. Representative Daily Average Production or Iniection Data OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation Subsequent to operation 15. Attachments Copies of Logs and Surveys run Daily Report of Well Operations X 1220 8839 6 0 0 0 0 0 1947 0 16. SteMS of wellclassific~ion as: Oil X Gas Suspended Service Form 10-404 Re¢06/15/88 SUBMIT IN DOPE'IC'/(TE WELL D-27 ...(24-14-11-1..3) .... PBU STIMULATION OPERATION Coiled tubing stimulation was done for well D-27 on January 24, 1991. Intervals listed below were perfed on 2/12/91: 9564'-9574' MDBKB Recovered approximately 9 BBL of cement during reverse out operations. Presqueeze coiled tubing TD was 9653', post squeeze depth was 9648'. Reversed in gas and recovered 42 BBLs of produced water. Freeze protected coiled tubing and flowline with 25 and 40 BBLs of methanol respectively. Well was tested and put on production. ,~aska .Oil & Gas Co~]s. Commission Anchorage mr:2/22/91 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION CC ,IISSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown Pull tubing 2. Name of Operator BP Exploration (Alaska) Inc. 3. Address P. 0. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 1606' SNL, 1692' WEL, SEC. 23, T11N, R13E, UPM At top of productive interval 33' NSL, 1887' EWL, SEC. 14, T11N, R13E, UPM At effective depth 5068' NSL, 3510' EWL, SEC. 14, T11N, R13E, UMI At total depth 253'NSL, 1740'EWL, SEC. 14, T11N, R13E, UPM 12. Present well condition summary Total depth: measured true vertical measured true vertical Length 110 2646 8962 measured Stimulate x Plugging Alter casing Repair well 5. Type of Well: Development ~ Exploratory S~'atigraphic Service 9784feet BKB 9210feet Plugs (measured) 9673feet Junk (measured) BKB 911/feet Effective depth: Casing Structural Conductor Surface Intermediate Production Liner Perforation depth: Size Cemented Perforate Other 20X30 13 3/8 9 5/8 1028 71 9564'-9574; 9583'-9597' 6. Datum elevation (DF or KB) KBE,, 71.91 AMSL feet 7. Unit or Property name Prudhoe Bay Unit 8. Well number D-27 (24-14-11-13) PBU 9. Permit number 86-33 10. APl number 50- 029-21543 11. Field/Pool Prudhoe Oil Pool fill at 9689' MD BKB (05/88) Measured depth 8 c.y. 139 3720 c.f. 2675 575 c.f. 8991 340 c.fo 8756-9784 True vertical depth BKB 139 2675 8483 8263-9120 true vertical subsea 9013'-9042' (two intervals) Tubing (size, grade, and measured depth) 4 1/2" L-80 to 8687'with 4 1/2" tailpipe to 8808' Packers and SSSV (type and measured depth) 9 5/8" TiWpacker at 8687'; 4 1/2" SSSV at 2073' 13. Stimulation or cement squeeze summary Intervals treated (measured) Treatment description including volumes used and final pressure 14. Reoresentative Daily Avera(~e PrOduction or Iniection Data - OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation Subsequent to operation 0 0 0 . 0 270 1079 2 0 0 173 15. Attachments 16. Status of well classification as: Copies of Logs and Surveys run Daily Report of Well Operatior~ X Oil ~[ Gas Suspended 17. I hereby~l~, ify that t~eg.~ is true a, nd correct to the best of my knowledge. Form 10-404 Rev 06~15/88 ~ Service SUBMIT IN DUPLICATE WELL D-27 (24-14-11-13) PBU STIMULATION OPERATIONS A CTU HCI treatment was performed Mamh 24, 1991 on Well D-27. Ran in hole with coiled tubing. Pumped 10 BBLS of diesel with MS into perfs, treated perfs with 28 BBLS of acid, flushed acid into perfs with 10 BBLS of diesel with xylene. During acid treatment injected SW down backside of coiled tubing to prevent acid migration up hole to squeezed perfs. The well was returned to production immediately following the treatment; then tested. mr/3/27/91 BP EXPLORATION BP Exploration (Alaska) Inc, 900 East Benson Boulevard RO. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 TO: DISTRIBUTION Date: 02/19/91 T#:82094 FROM: SUBJECT: Information Control Well Records LR2-1 .BP CASED HOLE. FINALS Enclosed is your copy of the material listed below. If you have any questions, please contact BP Well Records at (907) 564-4445. \ C-15 PFC LOG 02/14/91 #1 9283-9767 ATLAS \ D-27 COLLAR 02/12/91 #1 9392-9640 ATLAS ~.G-16 PFC LOG 02/13/91 #1 9800-10032 ATLAS % G-24 GR LOG 02/12/91 #1 9600-10396 ATLAS S-02 COLLAR 02/14/91 #1 9845-10713 ATLAS # 5" 5" 5" 5" Distribution: ARCO CHEVRON EXXON GEOSCIENCES MOBIL PHILLIPS RESERVOIR STATE OF ALASKA ARCHIVES BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 TO: DISTRIBUTION Date :01/28/91 T#:82061 FROM' SUBJECT: Information Control Well Records LR2-1 BP CASED HOLE FINAL$ Enclosed is your copy of the material listed below, if you have any questions, please contact BP Well Records at (907) 564-4445. D-27 Prod-F 01/06/91 #1 9350-9640 Camco 5" G-11 Prod-F 01/04/91 #1 11250-11517 Camco 5" G-11 CCL 01/04/91 #1 11250-11517 Camco 5" J-15 Leak Det 01/01/91 #1 11 060-11260 Camco 5" R-05 Inj 12/25/90 #1 8900-9160 Camco 5" Distribution: ARCO CHEVRON EXXON GEOSCIENCES MOBIL PHILLIPS RESERVOIR STATE OF ALASKA ARCHIVES BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5~11 TO: ARCO DATE: 11/19/90 EXXON T#: 81818 PHILLIPS STATE OF ALASKA ARCHIVES SYSTEM Tape & Transmittal Only BP MAGNETIC LIS TAPE & LISTING Enclosed is your copy of the material listed below. If you have any questions, please contact BP Well Records at (907) 564-4445. D-10 CH/CNL 11/12/90 #- ATLAS#4667 1600B PI D-27 CH/CNL 11/11/90 #- ATLAS#4666 1600BPI 10350-11239 TAPE POS.#07481 AP1#50-029-20389 Z-24 CH/CNL 11/08/90 #1 SC H#74190 1600 B PI 9809-10679 TAPE POS.#07483 AP!#50-029-21917 Information Control Well Records LR 2-1 J. Dietz/S. McCurry RECEIVED NOV 2 8 1990 ~laska 0il & Gas Cons. Commission Anci~orage BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard RO. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 TO: DISTRIBUTION Date :11/14/90 T#:81802 FROM: SUBJECT: Information Control Well Records LR2-1 BP CASED HOLE FINAL,.S. Enclosed is your copy of the material listed below. If you have any questions, please contact BP Well Records at (907) 564-4445. D-I 0 CN-GR 11/12/90 #1 10350-11239 Atlas 5" D-27 CN-GR 11/11/90 #1 8900-9659 Atlas 5" DiStribution: ARCO CHEVRON EXXON GEOSCIENCES MOBIL PHILLIPS RESERVO~.R~ AS K~,.---" F. ECEIVED NOV 2 0 1990 Alaska 0il &'-Gas cons. commission STATE OF ALASKA AL~,~KA OIL AND GAS CONSERVATION COMMISS,oN REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown Pull tubing Alter casing 2. Name of Operator BP Exploration (Alaska) inc. 3. Address P. O. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 1606' SNL, 1692' WEL, SEC. 23, T11N, R13E, UPM At top of productive interval 33' NSL, 1887' EWL, SEC. 14, T11N, R13E, UPM At effective depth 5068' NSL, 3510' EWL, SEC. 14, T11N, R13E, UM! At total depth 253'NSL, 1740'EWL, SEC. 14, T11N, R13E, UPM 12. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical 9784feet BKB 9210feet 9673feet BKB 9111feet Stimulate x Plugging Repair well 5. Type of Well: Development ..~ Exploratory Stratigraphic Service Perforate Other 6. Datum elevation (DF or KB) KBE= 71.91 AMSL feet 7. Unit or Property name Prudhoe Bay Unit 8. Well number D-27 (24-14-11-13) PBU 9. Permit number/approval number 86-33 / 9O-679 10. APl number 50- 029-21543 11. Field/Pool Prudhoe Oil Pool Plugs (measured) Junk (measured) fill at 9689' MD BKB (05/88) Casing Length Size Cemented Measured depth True vertical depth Structural -- BKB Conductor 110 20X30 8 c.y. 139 139 Surface 2646 13 3/8 3720 c.f. 2675 2675 Intermediate 8962 9 5/8 575 cof. 8991 8483 Production -- Liner 1028 7 340 c.f. 8756-9784 8263-9120 Perforation depth: measured 9566'-9573', 9583'-9597' true vertical subsea 9015'-9043' (two intervals) Tubing (size, grade, and measured depth) 4 1/2" L-80 to 8687' with 4 1/2" tailpipe to 8808' PackersandSSSV (typeandmeasureddepth) 95/8"TiWpackerat8687~4 1/2"SSSVat207ff'%ECEIvEo 13. Stimulation or cement squeeze summary Intervals treated (measured) See Attachment Treatment description including volumes used and final pressure 14. Prior to well operation Subsequent to operation Representative Daily Average Production or In!ection Data OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure 0 0 0 0 3010 3395 61 0 Tubing Pressure 171 222 15. Attachments 16. Status of well classification as: Copies of Logs and Surveys run Daily Report of Well Operations. X Oil X Gas. Suspended 17. I here? c~ify th~at th~e,~re~ng is true and correct Service Form 10-404 Rev 0/~ 5/88 to the best of my knowledge. Title Supervisor Gravity Drainage Date SUBMIT IN DUPLICATE WELL D-27 (24.14.11-13~ PBU STIMULATION OPERATIONS Intervals treated: 9566-9573' MD BKB 9583-9597' MD BKB Attempt to pump HC1 stimulation trhough packer. Packer failed. Pump job while maintaining pressure on annulus. Returned well to production. mr/lO/11/90 STATE OF ALASKA AL, ..~KA OIL AND GAS CONSERVATION COMMIS=iON APPLICATION FOR SUNDRY APPROVALS 1. Type of Request: Abandon . Suspend Alter casing Repair well . Change approved program 2. Name of Operator BP Exploration (Alaska) Inc. 3. Address P. O. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 1606' SNL, 1692' WEL, SEC. 23, T11N, R13E, UPM At top of productive interval 33' NSL, 1887' EWl., SEC. 14, T1 IN, R13E, UPM At effective depth 5068' NSL, 3510' EWL, SEC. 14, T11N, R13E, UMI At total depth 253'NSL, 1740'EWL, SEC. 14, T11N, R13E, UPM 12. Present well condition summary Total depth: measured 9784 feet true vertical BKB 9210 feet Operaaon Shutdown__ Plugging Time extension 'Pull tubing Variance Perforate 5. Type of Well: 6. Development x . Exploratory Stratigraphic . 7. Service Re-enter suspended well Stimulate x Other Datum elevation (DF or KB) KBE= 71.91 AMSL feet Unit or Property name Prudhoe Bay Unit 8. Well number D-27 (24-14-11-13) PBU 9. Permit number 86-33 10. APl number 50- 029-21543 11. Field/Pool Prudhoe Oil Pool Plugs (measured) Effective depth: measured 9673 feet true vertical BKB 9111 feet Junk (measured) fill at 9689'MD BKB (05/88) Casing Length Size Structural -- Conductor 110 20X30 Surface 2646 .13 3/8 Intermediate 8962 9 5/8 Production -- Liner 1028 7 Perforation depth: measured 9566'-9573', 9583'-9597' Cemented Measured depth True vertical depth BKB 8 c.y. 139 139 3720 c.f. 2675 2675 575 c.f. 8991 8483 340 c.f. 8756-9784 8263-9120 true vertical subsea 9015'-9043' (two intervals) Tubing (size, grade, and measured depth) 4 1/2" L-80 to 8687' with 4 1/2' tailpipe to 8808' Packers and SSSV (type and measured depth) 9 5/8" TlW packer at 86873 4 1/2" SSSV at 2073' 13. Attachments Description summary of proposal x Detailed operations program BOP sketch _.Z._ 14. Estimated date for commencing operation August 1990 16. If proposal was verbally approved Oil X Gas ~ Name of .approver Date approved Service 17.1 hereby/~rtify that the~fon[l~oing is true and correct to the best of my knowledge. Signed ~ ~) ~ Title Supervisor GraviS/Draina~le 15. Status of well classIfication as: Suspended FOR COMMISSION USE ONLY Conditions of approval: Notify Commission so representative may witness Plug integrity ~ BOP Test ~ Location clearance ~ Mechanical Integrity Test~ Subsequent form required 10- Date IAppr°val N°' Approved by order of the Commission Commissioner Date Form 10-403 Rev 06/15/88 Approved Copy I~etyrned ORIGINAL SIGNED BY LONNIE C. SMITH SUBMIT IN TRIPLICATE WELL D-27 (24-14.11-13~ PBI! STIMULATION OPERATIONS A selective HC1 treatment will be performed on the following perforated intervals in Well D-27. 9566'-957Y MD BKB 958Y- 9597'MDBKB The attached HCI acid stimulation is designed to stimulate the perforated intervals. The well will be returned to production immediately following the treatment. mr/8/23/90 BOP ,STACK _ . . .. . _ KILL LINE CONNECTION F I ii INJECTOR HEAD PACK OFF .. QUICK UNION -- BLIND SHEARS i~~_.~ENSOR SWAB VALVE TYPICAL CTU STACK FORM 1481 BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Renson Boulevard RO. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 TO: ARCO CHEVRON EXXON TEXACO MOBIL PHILLIPS ARCHIVES DATE: 01/24/90 T#: 80810 BP FINAL DATA - PRESSURE SURVEY DATA Enclosed is your copy of the material listed below. If you have any questions, please contact BP Well Records at (907) 564-4445. D-27 BHP Pressure Report 01/10/90 Static Gradient Camco F-26 BHP Pressure Report 01/12/90 Static Gradient Camco G-08 BHP Pressure Report 01/06/90 Static Gradient Camco H-22 BHP Pressure Report 01/08/90 Static Gradient Camco J-01 BHP Pressure Report 01/10/90 Static Gradient Camco K-02A BHP Pressure Report 01/12/90 Static Gradient Camco K-03 BHP Pressure Report 01/02/90 Static Gradient Camco K-12 BHP Pressure Report 01/13/90 Static Gradient Camco W-II BHP Pressure Report 01/06/90 Static Gradient Camco W-39 BHP Pressure Report 01/11/90 Static Gradient Camco RECEIVED Information Control Well Records LR 2-1 J. Dietz/S. McCurry JAN ] 1 !990 Alaska 0il:.& Gas Cons. ,C0mmissi~ Anchor;ge BP EXPLORATION BP Exl31oratlon (Alaska) Inc. 900 East Benson Boulevard RO. Box 196612 Anct~orage, Alaska 99519-6612 (907) 561-5111 To: Distribution Date: 01/15/90 Transmittal: 80763 From: Information Control Well Records LR2-1 Subject: BP CASED EOLE FINAL LOGS Enclosed is your copy of the material listed below. If questions, please contact BP Well Records at (907) 564-4445. A-02 COLLAR 12/31/89 91 C-12 PROD-F 12/29/89 ~1 D-27 PROD-F 12/31/89 #1 F-30 CCL/JEWELRY 12/27/89 ~1 H-02 LEAK DET. 12/29/89 #1 Q-03 FM/TEMP 12/26/89 ~1 R-27 PROD-F 12/31/89 #1 M-05 PROD-F/CL 12/30/89 92 M-12i INJ 12/30/89 91 M-12i CCL 12/27/89 ~1 T-01 INJ 12/28/89 92 you have 9000-11278 Camco 11600-11940 Camco SURF-9650 Camco 2"/5" 11500-12050 Camco SURF-8862 Camco 2"/5" 8800-9036 Camco 9450-9700 Camco 5" 12100-12510 Camco 5" 9750-10440 Camco 5" 9800-10004 Camco 5" 10500-10800 Camco 5" any Distribution: ARCO CHEVRON EXXON GEOSCIENCES MOBIL PHILLIPS RESERVOIR-.-/-----~ QfSTATE OF ALASKA_~ ARCHIVES · 'ons, C( mmlssl AnChOrage- BP EXPLORATION BP Exploration (Alaska) Inc. 900 East Benson Boulevard RO. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 To: Distribution Date: 10/03/89 Transmittal: 80428 From: Information Control Well Records LR2-1 Subject: BP CASED HOLE FINAL LOGS Enclosed is your copy of the material listed below. If you have any questions, please contact BP Well Records at (907) 564-4445. D-27 PERF 09/26/89 #1 8550-9656 Sch 5" U-02 PROD-F 09/26/89 #2 9750-10187 Sch 5" Distribution: ARCO CHEVRON EXXON GEOSCIENCES HOUSTON MOBIL PHILLIPS ALAS_KA~~-- ARCHIVES Alaska Oil & Gas Cons. Commissio Anchorage BP EXPLORATION OI IGI At BP Exploration (Alaska) Inc. 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 August 7, 1989 Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Attention: Mr. C. V. Chatterton Well D-27 (24-14-11-13) PBU Gentlemen: Enclosed, in triplicate, is Form 10-403, Application for Sundry Approvals, for the above-named well. This contains our proposal to perform a cement squeeze and reperforation of the well. Yours very truly, J. A. Bragg Manager Production Engineering JAM: JAM Enclosures (9) cc: L. Burke (MB12-1) Well File STATE OFALASKA ~ i~ I ~ I J~ A [ A,_,-,SKA OIL AND GAS CONSERVATION COMMt.~ ,.3N APPLICATION FOR SUNDRY APPROVALS 1. Type of Request: Abandon~ Suspend Alter casing ~ Repair well Change approved program . 2. Name of Operator BP Exploration (Alaska) Inc. 3. Address P. O. Box 196612, Anchorage, Alaska 99519-6612 Plugging Pull tubing ~ Variance__ 5. Type of Well: Development X Exploratory ~ Stratigraphic ~ Service Operation Shutdown ~ Re-enter suspended well ~ Time extension __ Stimulate ~ Perforate Other x 6. Datum elevation (DF or KB) KBE= 71.91 AMSL feet 7. Unit or Property name Prudhoe Bay Unit 4. Location of well at surface 1606' SNL, 1692' WEL, SEC. 23, T11N, R13E, UPM At top of productive interval 33' NSL, 1887' EWL, SEC. 14, T11N, R13E, UPM At effective depth 219'NSL, 1764'EWL, SEC. 14, T11N, R13E, UPM At total depth 253'NSL, 1740°EWL, SEC. 14, T11N, R13E, UPM 12. Present well condition summary Total depth: measured 9784 feet true vertical BKB 9210 feet Plugs (measured) 8. Well number D-27 (24-14-11-13) PBU 9. Permit number 86-33 10. APl number 50- 029-21543 11. Field/Pool Prudhoe Oil Pool Effective depth: measured 9689 feet true vertical BKB 9125 feet Junk (measured) fill at 9689'MD BKB (05/88) Casing Length Size Cemented Measured depth Structural -- Conductor 110 20X30 8 c.y. 139 Surface 2646 13 3/8 3720 c.f. 2675 Intermediate 8962 9 5/8 575 c.f. 8991 Production -- Liner 1028 7 340 c.f. 8756-9784 Perforation depth: measured 9508'-9574' true vertical subsea 8891 '-8950' Tubing (size, grade, and measured depth) 4 1/2"L-80 to 8687' with 4 1/2" tailpipe to 8808' Packers and SSSV (type and measured depth) 9 5/8" TIWpacker at 8687~ 4 1/2" SSSV at 2073' True vertical depth BKB 139 2675 8483 8263-9120 13. Attachments Description summary of proposal X Detailed operations program BOP sketch 14. Estimated date for commencing operation August 1989 16. If proposal was verbally approved Name of approver Date approved 15. Status of well classification as: Oil X Gas Suspended Service 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Si~ned ~~ _~Ti~l=ORc~l;MMisa~s~oe~Pu;O~U~OL;En~lineerin~ Date Conditions of approval: Notify Commission so representative may witness Plug integrity ~ BOP Test~ Location clearance ~ Mechanical Integrity Test~ Subsequent form required 10- ~0 ~'! Origlnal Signed By Approved by order of the Commission DaVid W. Johnston Form 10-403 Rev 06/15/88 Returned Commissioner Date <4 ~-~"~ SUBMIT IN TRIPLICATE STATE SUNDRY NOTICE Well D-27 Well D-27 needs a GSO cement squeeze with coiled tubing. The program involves squeezing all perforations followed by reperforation. A summary of the planned procedure is as follows: 1, MIRU coiled tubing unit, 2, Acid wash the perforations, 3, Liquid pack the well and cool the reservoir, 4, Jet with surfactant to cleanse the perfs of oil carry over, 5, Cement squeeze all perforations up to 3500 psi differential, 6, Reverse out cement after holding squeeze for 30 to 40 minutes. 7, Reverse in nitrogen blanket for freeze protection. 8, Leave well with WHP sufficient to maintain 500 to 1000 psi positive differential at perforations for WOC period, 9. Inflow test well by releasing trapped nitrogen blanket. 1 0. Resqueeze well if test shows inflow. 11, If no inflow is observed then reperforate as follows: 9566'-9573' Ref. 2/24/86 BHCS 9583'-9597' 12, Put well on production, PRH.8/4/89 Coifed Tubing Pack:-O f? Bffnd Rams Cut,er Rams '~-~2" Chk:k::san (Kit[ Line) - I ~ Pipe Rams ump-ln Sub (CIrc uL~ te/R e turns) W ell Head Swab Valve S~a.do~d Alo$1~ a P~oduction Cot. par(t 900 Eos~ Ben,on Boulevo~d P.O. An(~o~oge, (907) 564.511 I DALLAS ARCO CHEVRON EXXON TEXACO lO: MOBIL PHILLIPS STATE OF ALASKA GEOSCIENCES RESERVOIR REFERENCE: ARCHIVES '. *Drilling SAPC CASED HOLE FINAL LOGS INDEXED STANDARD ALASKA PRODUCTION Date: 06/07/88 TI: 78922 The following material Js being submitted herewith. Please acknowledge receipt by signing a copy of thls letter and returnlng It to this office: A-5 D-27 H-5 N-16 N-16 U-2 *Z-6 *Z-6 Z-6 Production'Temp 05/29/88 #2 10700-11150 Sch 5" CH/eL 05/27/88 #1 8900-9685 " " Spectroscopy(NGRS) 06/01/88 #1 111381-11550 .... Spectroscopy(GST) 05/30/88 #1 10035-10411 " " CNT-GR 05/25/88 #1 9600-10381 " " Spinner/Temp 05/29/88 #1 9750-10250 " " CET 05/31/88 #1 9245-10396 " " CBT 05/31/88 #1 9245-10374 " " Perf/Record 05/31/88 #1 9395-10378 " " Stondo,d AIo~.h o P~o~ucf;on Compon¥ 900 Eo,4 Ben'so,,', Boule,,o P.O. Bo. 19661;) An,tho, og¢. Alosto 99_519.. (907) 56-s-511 I ARCO STANDARD ALASKA PRODUCT'ION EXXON Date: 06/02/88 PHILLIPS '~x TI: 78891 TATE OF AK SYSTEMS (Transmittal & Tape) ARCHIVES REF~RINCE: SAPC ~D~GNETIC LIS TAPES & LISTINGS T~e following material is beir~j sukn~tted herewith. Please acknowleckje receipt signinq a copy of this letter and returnin~ it to this office: D-27 Ctt/CNL tape 05/27/88 CH/CNL tape 05/25/88 (1600bpi) #1 8896-9710 Sch #72772 Tape Pos. #05782 (1600bpi) #1 9594.5-10421.5 Sch #72773 Tape Pos. #05783 '* EXXON' An Asterisk (*) next to a listing above means you should have received the Tape(s) and Listing(s) directly from tile respective service company. Please confirm this. Received Date v,,,, ,,~ ,~ o,,q.,.~,) %,.,,.,].,,~1 O.I L,c,-.,l~,t,,,t ~'",s-',f.-,~ ... ~-f...-i,,..,t (..,.. .... Victoria Aldridge INFL~TI ~ O2~'¢ l]lOb Well Records I~2-1 Standard Alaska Production Company 900 East Benson Boulevard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-51 t 1 STANDARD ALASKA PRODUCTION February 25, 1988 Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Attention: Mr. C. V. Chatterton Well D,27 (24,14-11,13) PBU Gentlemen: Enclosed, in duplicate, is Form 10-404, Report of Sundry Well Operations, for the above-named well. This contains our subsequent report of perforating the well. Yours very truly, JTB:JAM~~'~ Enclosures (4) J. L. Haas (MB12-1) Well Records (LR2-1) w/10 D-27 Well File wn,. Supervisor Gravxty raxnage A unit of the original Standard Oil Company Founded in Cleveland, Ohio, in 1870. STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS 1. Operation performed: Operation shutdown [] Stimulate [] Plugging [] Perforate [] Pull tubing [] Alter casing r-I Other [] 2. Name of Operator Standard A!a_-,'.ka Production Company 3. Address :. P. O. Box 196612, Anchorage, Alaska 99519-6612 ¢. Location of well at surface 1606' SNI., 1692' WEL, SEC. 23, T11N, R13E, UPM At top of productive interval 33' NSL, 1887' EWI., SEC. 14, T11N, R13E, UPM At effective depth 226'NSL, 1759'EWL, SEC. 14, T11N, R13E, UPM At total depth 253' NSL, 1740' EWL, SEC. 14, T11N, R13E, UPM 1. Present well condition summary Total depth: measured 9784 feet Plugs (measured) 5. Datum elevation (DF or KB) KBE,, 71.91 AMSL feet 6. Unit or Property name Prudhoe Bay Unit ~. Well number D.27 (24-14-11-13) PBU 8. Approval number 7-656 9. APl number 5 0 - 029-21543 10. Pool Prudhoe Oil Pool true vertical BKB 9210 feet Effective depth: measured 9706 feet true vertical BKB 9140 feet Casing Length Size Structural -- Conductor 110 20X30 S u rface 2646 13 3/8 Intermediate 8962 9 5/8 Production -- Liner 1028 7 Perforation depth: measured 9508'-9574' true vertical subsea 8891 '-8950' Tubing (size, grade and measured depth) Junk (measured) FILL @ 9706' Cemented 8 c.y. 3720 c.f. 575 c.f. Measured depth 139 2675 8991 True Vertical depth BKB 139 2675 8483 340 c.f. 8756-9784 8263-9120 4 1/2" L-80 to 8687' with 4 1/2" tailpipe to 8808' Packers and SSSV (type and measured depth) 9 5/8" TlWpacker at 8687'; 4 1/2" SSS V at 2073' 2. Stimulation or cement squeeze summary Intervals treated (measured) Treatment description including volumes used and final pressure . Prior to well operation Subsequent to operation Reoresentative Daily Average Production or In!ection Data OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure 1880 1139 19 0 5320 3511 54 0 Tubing Pressure 242 518 4. Attachments Daily Report of Well Operations [] Copies of Logs and Surveys Run [] 5. I hereby certify that the foregoing is true and correct to the best of my knowledge ~,~'~- /~-~ i' ?? Signed Title Supervisor Gravity Drainage Date :orm 10-40'4 Rev. 12-1-85 Submit in Duplicate Well D-27 (24-14-11-13) PBU Additional Perforating Operations The following additional intervals were perforated February 8, 1988 using Schlumberger 3 3/8" Hyperjet II carrier guns at 4 spf: 9508' - 9530' ~D BKB (8891' - 8910' TVDss) 9560' - 9574' MD BKB (8937' - 8950' TVDss) Depths are referenced to BHCS, 2/24/86. A lubricator was installed and tested to 3500 psi for all well work. The well was returned to production immediately following perforating operations. jam 2/23/88 0800Z INDEXED DALI~\S ARCO CHEVRON E)CXON TEXACO Date: 02/17/88 TO: MOBIL rt: 78557 PHILLIPS STATE OF ALASKA GEOSCIENCES s'rANDARD ALASKA PRODUCTION REFERENCE: SAPC CASED HOLE FINAL LOGS The following material Is being submitted herewith. Please acknowledge receipt by slgnlng a copy of this letter and returning it to this office: A-2 PITS 02/11/88 #1 11150-11490 Camco 5" A-13 Borehole Audio Tracer Survey 01/15/88 #1 100-8650 GO 2" ~ A-13 Temp 01/15/88 #1 100-8650 GO 2" ~ A-27 Temp 01/31/88 #1 Surf-8543 GO 5"/2" -'"~A-27 Borehole Audio Tracer Survey 01/31/88 100-8530 GO 2" "-.~C-1 CCL/Pacer Setting 02/10/88 #- 7400-8850 Sch 5" ~ D-27 Perf. Record 02/08/88 #2 9300-9676 Sch 5" ~ E-1 Prod. Profile 02/05/88 #1 9300-9750 Camco 5" '"'-~E-4 Perf. Record(REPLACEMENT) 01/19/88 #1 9500-10076 Sch 5" "~'~'E-25 CBT 01/26/88 #1 8600-11470 Sch 5" ~ E-25 CET 01/26/88 #1 8600-11470 Sch 5" R-23 Temp. 02/01/88 #1 11450-12100 Camco 5" ,-,..-~..-, Oil & ~;~s '"'~ ",-, ' · o ,,.;h ,~. A un,t Ot th~. o~,9;~01 S*ondo~d (]~l (O.~l::>on~ I:ounded ,n [l¢.~'lond C)K,o. ,n Victoria Aldridge I NFORMAI I ON CONTRO~ Wel I Records LR2-1 Standard Alaska ~- Production Compa 900 East Benson Bou~-vard P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 STANDARD ALASKA PRODUCTION October 1, 1987 Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Attention: Mr. C. V. Chatterton Well D-27 (24-14-11-13) PBU Gentlemen: Enclosed, in triplicate, is Form 10-403, Application for Sundry Approvals, for the above-named well. This contains our proposal to perforate the well. Yours very truly, JTB:JAM'~ Enclosures (9) cc: J. L. Haas (MB12-1) D-27 Well File ~own, Supervisor Reservoir/Production Surveillance Unit I A unit of the original Standard Oil Company Founded in CleveJand, Ohio, in 1870. STATE OF ALASKA ALA~.,A OIL AND GAS CONSERVATION CON .... ~SSION APPLICATION FOR SUNDRY APPROVALS 1. Type of Request: Abandon [] Suspend [] Operation Shutdown [] Re-enter suspended well [] Alter casing [3 Time extension [] Change approved program [] Plugging [] Stimulate [] Pull tubing [] Amend order [] Perforate [] Other [] 2. Name of Operator 5. Datum elevation (DF or KB) STANDARD ALASKA PRODUCTION COMPANY KBE = 71.91 feet 3. Address 6. Unit or Property name P. O. BOX 196612, ANCHORAGE, ALASKA 99519-6612 Prudhoe Bay Unit 4. Location of well at surface 1606' SNL, 1692' WEL, Sec. 23, TllN, R13E, UPM At top of productive interval 33' NSL, 1887' EWL, Sec. 14, TllN, R13E, UPM At effective depth 238' NSL, 1751' EWL, Sec. 14, TllN, R13E, UPM At total depth 253' NSL, 1740' EWL, Sec. 14, TllN, R13E, UPM 7. Well number D-27 (24-14-11-13) PBU 8. Permit number 86-33 9. APl number 50--029-21543 10. Pool Prudhoe Oil Pool 11. Present well condition summary Total depth: measured true vertical 9784 feet Plugs (measured) 9210 feet BKB Effective depth: measured 9741 feet Junk (measured) true vertical 9171 feet BKB Casing Length Size Cemented Structural -- Conductor 67' 20"×30" 8 cu.yds. Surface 2632' 13 3/8" 3720 c.£. Intermediate 8948' 9 5/8" 575 c.f. Production -- Liner 1028' 7" 340 c.f. Perforation depth: measured 95 30' - 9560' true vertical (ss) 8910' - 8937' Tubing (size, grade and measured depth) 4 1/2" L-80 to 8687' with 4 1/2" tailpipe to 8808' Packers and SSSV (type and measured depth) 9 5/8" TIW packer at 8687'; 4 1/2" SSSV at 2073' 12.Attac h ments Measured depth 110' 2675' 8991' 8756'-9784' True Vertical depth BKB 110' 2675' 8483' 8263' -9210 ' Description summary of proposal f~ Detailed operations program [] BOP sketch 13. Estimated date for commencing operation October 1987 14. If proposal was verbally approved Name of approver Date approved 15. I hereby certify that the foregoing is true and correct to the best of my knowledge S? n~ed ~:(~t~ Title Sul:)vr. Res/Prod. Surveillance I Date Brown Commission Use Only Conditions of approval Approved by Form 10-403 Rev 12-1-85 Notify commission so representative may witness [] Plug integrity [] BOP Test [] Location clearance Commissioner the commission Date/{-.)-'-" ~? '-~?1 Submit in triplicate Well D-27 (24-14-11-13) PBU ADDITIONAL PERFORATING PROPOSAL We propose to perforate the following additional interval in Well D-27 during October 1987 at either 4 or 6 spf: 9508' - 9530' MD BKB 9560' - 9574' MD BKB All depths are referenced to BHCS/GR, 2/24/86. A lubricator will be installed and tested to'3500 psi for all well work. Following perforating operations, the well will be returned immediately to production and tested. jm 9/30/87 FLOW TUBES & PACKOFF BOWEN PACKOFF ~-"-" HAND GREASE SEAL FLOWTUBE PUMP FLOWLINE GREASE LINE FLOWLINE VALVE OC'~' 0 ~. '~S~'I Oil 8, GaS Cons. comm~ GREASE ~'"" MANIFOLD GREASE PUMP RISER · ..~ GREASE RESERVOIR BOP Standard Alaska Production Compa~ 900 East Benson Boul~,,~rd P.O. Box 196612 Anchorage, Alaska 99519~6612 (907) 561-5111 August 14, 1987 STANDARD ALASKA PRODUCTION Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Attn: Mr. C. V. Chatterton Well D-27 (24-14-11-13) PBU Gentlemen: Enclosed, in duplioa%e, is Form 10-404, Report of Sundry Well Operations, for the above-named well. This contains our subsequent report of reperforating and stimulating the well. Yours very truly, JAB: JAM ~ s~pA. Bragg ff ~ ervisor Production Operations Enclosures (4) cc: J. L. Haas (MB12-1) Well Records (LR2-1) w/10 D-27 Well File RECEIVED AUG 1 ? 1~B7 AlasRa Oil & Gas Cons. commission Anchorage A unit of the original Standard Oil Company Founded in Cleveland, Ohio, in 1870 STATE OF ALASKA ALA,,.,A OIL AND GAS CONSERVATION CON..,,ISSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown [] Stimulate [] Plugging [] Perforate [] Pull tubing [] Alter Casing [] Other [] 2. Name of Operator 5. Datum elevation (DF or KB) STANDARD. ALASKA PRODUCTION COMPANY KBE = 71.91 Feet 3. Address 6. Unit or Property name P. o. BOX 196612, ANCHORAGE, ALASKA 99519-6612 Prudhoe Bay Unit 4. Location of well at surface 7. 1606' SNL, 1692' WEL, Sec. 23, TllN, R13E, UPM At top of productive interval 8. Well number D-27 (24-14-11-13) PBU Approval number 7-257 9. APl number 50-- 029-21543 33' NSL, 1887' EWL, Sec. At effective depth 238' NSL, 1751' EWL, Sec. At total depth 253' NSL, 1740' EWL, Sec. 14, TllN, R13E, UPM 14, TllN, R13E, UPM 14, TllN, R13E, UPM 10. Pool Prudhoe Oil Pool 11. Present well condition summary Total depth: measured 9784 true vertical 9210 Effective depth: measured 9741 true vertical 9171 Casing Length Structural -- Conductor 67 ' Surface 2632 ' Intermediate 8948 ' Production -- Liner Perforation depth: Size 20"x30" 13 3/8" 9 5/8" feet feet BKB feet feet BKB Cemented 8 cu. yds. 3720 c.f. 575 c.f. 340 c.f. 1028' 7" measured 9530' - 9560' true vertical (ss) 8910' - 8937' Tubing (size, grade and measured depth) 4 1/2" L-80 to 8687' with 4 1/2" tailpipe to 8808' Packers and SSSV (type and measured depth) 9 5/8" TIW packer at 8687'; 4 1/2" SSSV at 2073' Plugs (measured) Junk (measured) Measured depth 110 ' 2675' 8991' 8756'-9784' True Vertical depth BKB 110' 2675' 8483' 8263' -9210 ' RECEIVED AUG 1 7 1987 12. Stimulation or cement squeeze summary See attachment Intervals treated (measured) Treatment description including volumes used and final pressure Alaska 0il & Gas Cons. Commission Anchorage 13. Prior to well operation Subsequent to operation Representative Daily Average Production or Injection Data OiI-Bbl Gas-Mcf Water-Bbl Would not flow. Casing Pressure 920' 961 10 0 Tubing Pressure 207 14. Attachments Daily Report of Well Operations [] Copies of Logs and Surveys Run L~ 15. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed (~~ ~,/~,//~ Title Supervisor Production Operations Form lO-4~Rev. 12-1-85 ~U Date (r~' [ ("(~1 Submit in Duplicate Well D-27 (24-14-11-13) PBU REPERFORATING & STIMULATING OPERATIONS 4/23/87 Rigged up Schlumberger and reperforated the following interval using 3 3/8" Hyperjet guns at 4 spf: 9530' - 9560' MD BKB (ref. BHCS 2/24/86) Attempted to return well to production, but would not flow. 6/13/87 Set an inflatable packer at 9520' and pumped 46.9 bbls. xylene and 46 bbls. NH4C1. Well would not flow. 7/22/87 Performed a 94.3 bbl. HC1/xylene perforation wash. Put well on production and tested. jm 8/7/87 AUG 1 7' ].987 OiJ & Gas 0ohs. 6emmissier~ ,Ar~cho~'ade Standard Alaska Production Compant 900 East Ben~on Bouh~ d P.O Box 196612 Anchorage. Alaska 99519-6612 ~907~ 564.5 I I I INDEXED DALI. S /taco STANDARD CHEVRON ALASKA PRODUCTION EXXON Date: 08/05/87 TEXACO 78106 TO: T#: MOBIL PHILLIPS STATE OF ALASKA REFERENCE: SAPC FINAL DATA - PRESSURE SURVEY DATA The following material Is being submitted herewith. Please acknowledge receipt by signing a copy of This letter and returning IT to thls office: A-1 A-22 A-26 A-29 A-32 A-35 D-9 D-25 D-26 D-27 D-28 D-29 G-19 G-25 G-31 H-21 H-22 H-24 H-26 J-22 U-2 U-6 07/09/87 Camco Static Gradient 07/12/87 " " " 07/09/87 " " " 07/11/87 " " " 07/13/87 " " " 07/13/87 " " " 07/21£87 " " " 07/10/87 " " " 07/10/87 " " " 07/07/87 " " " 07/22/87 " " " 07/22/87 " " " 07/08/87 " " " 07/08/87 " " " 07/07/87 " " " 07/25/87 " " " 07/25/87 " " " 07/25/87 " " " 07/25/87 " " " 07/27/87 " " " 07/17/87 " " " 07/17/87 " " " U-8 07/16/87 " " " ~ 13-12 07/15/87 " "/~ ~" //~/ X-2 07/27/87 "/'~ Jf.,~l~.~" / / Y-l-2 07/15/87 "/ lo~f]tA~ pw, / ~ ~c~,~d ..... I I~~ ~ ~ /~ d/ Ldr~dg~ Date / /N ~ ' ~_--~l{~0~ Well Records LR2-1 Standard Alaslca Pteeluction Compc 900 Eost B~nson Bou,,;vord P.O Bo,,, 196612 A,-~ho~'oge. AIosko 995 ! 9-66 DALLAS ARCO iNDEXED STANDARD CHE~ON ALASKA PRODUCTION EXXON Date: 0 6 / 2 5 / 8 7 TEXACO TO: T#:_ , ,77997 MOBIL . PHILLIPS STATE OF ALASKA REFERENCE: SAPC FINAL DATA - PRESSURE SURVEY DATA The following material is being submitted herewith. Please acknowledge recelpt by signing a copy of this letter and returning it to this office: D-27 Static Gradient 06/20/87 Rec e I ye d ,:?.::_. Oil & Gas Cons. Commission Anchora~ Celina Plack Wel I Records Standard Alaska Production Compnn¥ Anchoroge. AlonZO 99519.66 TO: DALI. AS ARCO CHEVRON EXXON TEXACO MOBIL PHILLIPS STATE OF ALASKA GEOSCIENCES INDEXED STANDARD ALASKA. PRODUCt-IOh~ 04/04/87 Date: T#: 77859 REFERENCE: SAPC CASED HOLE FINAL LOGS The following material Is being submitted herewlth. Please acknowledge receipt by slgnlng a copy of thls letter and returning It to this offlce: J- 23 J- 23 J- 23 D- 27 G- 25 Y-13 CBT 04/25/87 26 26-9814 Sch 5" #2 CET 04/25/87 26 26-984 2- Sch 5" # 2 C.H.CNL 04/25/87 2626-9782 Sch 5" #2 Completion Record 04/23/87 9420-9680 Sch 5" #2 Prod. Profile 04/20/87 10250-10496 Sch 5" G.R. 04/25/87 10250-10655 Sch 5" #1 #1 Alaska Oil & Gas Cons. Commission Anchorage Rece i ved Date Celina Plack INFORMAT 10N CONTROL Wel I Records UR2-1 Standard Alaska Production Compa n~, 900 East Benson Boule~,a P.O. Box 196612 Anchorage, Alaska 99519-6612 /907) 561-5111 STANDARD ALASKA PRODUCTION April 14, 1987 Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Attn: Mr. C. V. Chatterton Well D-27 (24-14-11-13) PBU Gentlemen: Enclosed, in triplicate, is Form 10-403, Application for Sundry Approvals, for the above-named well. This contains our proposal reperforate the well in order to return the well to its original capacity. Yours very truly, JAB:jAM'~~ Enclosures (9) cc: J. L. Haas, MB12-1 D-27 Well File f/J. A. Bragg Supervisor Production Operations A unit of the original Standard Oil Company Founded in Cleveland, Ohio, in 1870. ~tAI I:. UP ALA~ttA ALA~. , OIL AND GAS GONSERVATION GOM .SION APPLICATION FOR SUNDRY APPROVALS 1. Type of Request: Abandon ~ Suspend ~, Operation Shutdown ~ Re-enter suspended well .~ Alter casing !_7: Time extension /_ Change approved program '- Plugging L~ Stimulate ~ Pull tubing m Amend order ~- Perforate :X: Other 2. Name of Operator 3. Address ?. O. ;BOX 196612r ANCHORAGF.., ALASKA 99519-6612 4. Location of well at surface 1606' SNL, 1692' WEL, Sec. 23, TllN, R13E, UPM At top of productive interval 33' NSL, 1887' EWL, Sec. 14, TllN, R13E, gPM At effective, depth 238' NSL, 1751' EWL, Sec. 14, TllN, R13E, UPM At total depth 253' NSL, 1740' EWL, Sec. 14, TllN, R13E, UPM 5. Datum elevation (DF or KB) KBE = 71.91 feet 6. Unit or Property name Prudhoe Bay Unit 7. Well number D-27 (24-14-11-13) PBU 8. Permit number 86-33 9. APl number 50--029-21543 10. Pool Prudhoe Oil Pool 11. Present well condition summary Total depth' measured 9784 feet true vertical 9210 feet BKB Plugs (measured) Effective depth: measured 9741 feet Junk (measured) true vertical 9171 feet BKB Casing Length Size Cemented Structural -.- Conductor. 67' 20"x30" 8 cu.;yds. Surface 2632' 13 3/8" 3720 c.£. Intermediate 8948' 9 5/8" 575 c.f. Production -- Liner 1028' 7" 340 c·f. Perforation depth: measured 9530' - 9560' true vertical (subsea) 8910' - 8937' Tubing (size, grade and measured depth) 4 1/2" L-80 to 8687' with 4 1/2" tailpipe to 8808' Packers and SSSV (type and measured depth) 9 5/8" TIW packer at 8687'; 4 1/2" SSSV at 2073' Measured depth 110' 2675' 8991' 8756'-9784' True Vertical depth BKB 110' 2675' 8483' 8263' -9210 ' RECEIVED Alaska 0il & 6as Cons. 60mm{ssi0~ ~ch0rage 12.Attachments Description summary of proposal ~ Detailed operations program :.-_ BOP sketch 13. Estimated date for commencing operation April/May 1987 14. If proposal was verbally approved Name of approver Date approved 15. I hereby certify that the foregoing is true and correct to the best of my knowledge Sig-~'d ~ ,.~.~ Title Supervisor Production OperationsDate ~'*..,~J. A. Bragg Commission Use Only Conditions of approval Notify commission so representative may witness ~ Plug integrity ~ BOP Test Q Location clearance Commissioner Approved by Form 10-403 Rev 12-1-85 Approval No. ----'/ .... /,...2 7 by order of'~ ~~' the commission Date Submit in triplicate Well D-27 (24-14-11-13) PBU REPERFORATING PROPOSAL We propose to reperforate the following interval in Well D-27 in order to return the well to its original capacity. 9530' - 9560' MD BKB (Ref. BHCS 2/24/86) A lubricator will be installed and tested to 3500 psi for all well work. Following perforating operations, the well will be returned to production and tested. jm 4/13/87 BASIC SYSTEM MAKEUP BOWEN PACKOFF' HAND GREASE SEAL FLOWTUBE PUMP F"LOWLINE FLOWLINE VALVE ~ GREASE ~/~ MANIFOLD ~ ~ PUMP RISER ~~GREASE ~1 RESERVO~ BOP Standard Alaska ~-"~ Production Company 900 East Benson Boule~ P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 564-5111 STANDARD ALASKA PRODUCTION April 8, 1987 Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Well D-27 (24-14-11-13) PBU Gentlemen: Enclosed, in duplicate, is Form 10-404, Report of Sundry Well Operations, for the above-named well. This contains our subsequent report of stimulating the well. Yours very truly, JAB: JAM Enclosures (4) cc: J. L. Haas (MB12-1) Well Records (LR2-1) w/10 D-27 Well File J. A. Bragg Supervisor Production Operations A unit of the original Standard Oil Company Founded in Cleveland, Ohio, in 1870. .... STATE OF ALASKA ALASK,, OIL AND GAS CONSERVATION COMM 5ION REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown [] Stimulate [] Plugging [] Perforate [] Pull tubing Alter Casing [] Other ~ 2. Name of Operator STANDARD ALASKA PRODUCTION COMPANY 3. Address P. O. BOX 196612, ANCHORAGE, ALASKA 99519-6612 4. Location of wellatsurface 1606' SNL, 1692' WEL, Sec. 23, TllN, R13E, OPM Attop ofproductiveinterval 33' NSL, 1887' EWL, Sec. 14, TllN, R13E, UPM Ateffective depth 238' NSL, 1751' EWL, Sec. 14, TllN, R13E, OPM Attotaldepth 253' NSL, 1740; EWL, Sec. 14, TllN, R13E, UPM 5. Datum elevation (DF or KB) KBE = 71,91 Feet 6. Unit or Property name Prudhoe Bay Unit 7. Well number D-27 (24-14-11-13) PBU 8. Approval number 7-.'13 9. APl number 50--029-21543 10. Pool Prudhoe Oil Pool 11. Present well condition summary Total depth: measured 9784 true vertical 9210 feet Plugs (measured) feet BKB 12. Effective depth: measured 9741 feet Junk (measured) true vertical 9171 feet BKB Casing Length Size Cemented Structural __ Conductor 67' 20"x30" 8 cu.yds. Surface 2632' 13 3/8" 3720 c.f. Intermediate 8948' 9 5/8" 575 c.f. Production __ Liner 1028' 7" 340 c.f. Perforation depth: measured 9530' - 9560' true vertical (subsea) 8910' - 8937' Tubing (size, grade and measured depth) 4 1/2" L-80.'to 8687' with 4 1/2" tailpipe to 8808' Packers and SSSV (type and measured depth) 9 5/8" TIW packer at 8687'~ 4 1/2" SSSV at 2073' Stimulation or cement squeeze summary Mud acid treatment Intervals treated (measured) 9530' - 9560' Treatment description including volumes used and final pressure See attachment Measured depth 110' 2675' 8991' 8756'-9784' True Vertical depth BKB 110' 2675' 8483' 8263'-9210 ' 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas. Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation 940 714 9 0 201 Subsequent to operation Well will not flow. 14. Attachments Daily Report of Well Operations Copies of Logs and Surveys Run [] 15. I hereby certify that the foregoing .is true and correct to the best of my knowledge ~7~" / - ¢ ~ ' ~;>7 Signed ~ ~--. ~ ~ ~g.~.~g~, Title Supervisor Production Operations Date Form 10-404 Rev. 12-1-85 Submit in Duplicate Well D-27 (24-14-11-13) PBU STIMULATI ON OPERATIONS A bullheaded mud acid treatment was performed January 4, 1987, on the following perforated interval in Well D-27: 9530' - 9560' MD BKB The treatment consisted of the fot. lowing: 1500 gal. 15% HC1 2900 gal. 6% HC1 - 1.5% HF 1500 gal. 3% NH4C1 brine All treatment fluids were nitrified with 300 scf/stb. Treatment fluids were displaced ~to the perforations with dead crude. Attempted to return the well to prOduction following the treatment, but would not flow. Nitrogen-lifted the well on January 6, 1987, but well would still not flow. Well currently shut-in. jm 3/31/87 Standard Alaska P~'oductlon Compony 900 Eos! 13~nson Boulevo: PO Bo~ 19661~ (907) 564-5! I I INDEXED DALLAS ARCO CHEVRON EXXON TEXACO Date: 01/06/87 TO: MOBIL TI: 77645 PHILLIPS STATE OF ALASKA GEOSCIENCES STANDARD ALASKA PRODUCTION REFERENCE: SAPC CASED HOLE FINAL LOGS The following material is being submitted herewith. Please acknowledge receipt by signing a copy of thls letter and returning It to this office: D-27 Perf. Record 08/13/86 #1 8600-9688 Sch 5" D-28 Perf. Record 07/30/86 #1 9500-11108 Sch 5" E-7 Perf. Record 07/23/86 #! 8850-9440 Sch 5" E-7 Perf. Record 08/15/86 #1 9330-9438 Sch 5" E-9 Perf. Record 08/22/86 #1 10500-10900 Sch 5" G-1 Perf. Record 08/26/86 #1 8700-10051 Sch 5" G-19 Perf. Record 08/29/86 #1 10680-11524 Sch 5" H-21 Perf. Record 08/11/86 #1 9200-9930 Sch 5" H-22 Perf. Record 08/12/86 #1 8690-9940 Sch 5" N-3 Perf. Record 08/10/86 #1 10900-11746 Sch 5" N-3 Perf. Record 08/20/86 #2 10900-11708 Sch 5" Q-5 Perf. Record 07/20/86 #1 9250-10318 Sch 5" Q-3 Perf. Record 07/27/86 #2 8795-9170 Sch 5" .,4? Date . {' A un,l of the Or,g;noI ,~ondo~d O,I Co,nlm~On¥ (i~_Victoria ' Aldridge r~OR~T ION' CONTROC Wel I Records LR2-1 Standard Alaska Pr~luction Company 900 Eott Be.son Boulevo,d PO. Bo~ 196612 Anchorage. Alaska 99519-6612 (907) 564-51 ! I INDEXED DALLAS ARCO c~wo~ STANDARD EXXON TEXACO Date: 01/06/87 ?O: MOOIL Il: 77644 PHILLIPS STATE OF ALASKA GEOSCIENCES ALASKA PRODUCTION REFERENCE: SAPC CASED HOLE FINAL LOGS The following material Is being submitted herewith. Please acknowledge receipt by signing a copy of this letter and returning It to this office: A.-].6- Injection Profile/Flowmeter/Temp A-23 Temp. 10/24/86 #1 A-23 BoreholeAudio Tracer 10/24/86 A-23 Borehole Audio Tracer 11/06/86 A-23 DFT 11/06/86 #1 B-9 Borehol& Audio Tracer 11/16/86 D-17 CCL/Perf. 11/23/86 #1 D-18 CCL/Perf. 11/23/86 #1 D-26 Spinner 12/07/86 #1 D-27 CCL/Perf, 11/19/86 #1 D~28 CCL/Perf, . 11/20/86 #1-3 E-7 EPL 07/23/86 #1 E-9 CCL/Perf, 11/16/86 #1 E-9 Cont, Flow Survey 11/29/86 #1 E-9 Temp, 11/29/86 #1 G-31 CCL/Perf, 11/10/86 #1 ~-15 Collar 12/07/86 #1 H-20 CCL/Perf, 10/25/86 #1-2 M-17 Temp. 11/29/86 #1 M-22 CCL 10/30/86 #1 P-14 GR/Correlation 11/07/86 #1 T-I' Injection Profile 11/22-23/86 #1 U-3 Injecion Profile 11/29-30/86 #1 11/26-27/86 #1 9900-11182 Camco 2700-10100 GO 2"/5"/1" #1 1000-10600 GO 2" #1 500-10600 GO 1" 3950-10600 GO 5" #1 1900-3200 GO 5" 8850-10346 GO 5" 10700-11260 GO 5" 10500-10870 Camco 5" 8650-9690 GO 5" 9500-11110 GO 5" 8350-9457 Sch 5" 10600-10980 GO 5" 10500-10905 GO 5" 10500-10905 GO 5" 6980-9228 GO 5" 0-2500 CAMCO 5" 9050-10200 GO 5" 11000-11758 GO 5" 9500-10550 GO 5" 10790-11000 GO 5" 10400-10923 CAMCO 5" 9000-9530 CAMCO 5" Victoria Aldridge ~NFORMAT ~ON CONTROL We~ ~ Records LR2-1 11 Standard Alaska Production Comp. 900 East Benson Bo~. .~rd P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 561-5111 January 5, 1987 STANDARD ALASKA PRODUCTION Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Attention: Mr. C. V. Chatterton Gentlemen: Well D-27 (24-14-11-13) PBU Enclosed, in triplicate, is Form 10-403, Approvals, for the above-named well. This stimulate the well. Application contains our for Sundry proposal to Yours very truly, JAB:JAM~ Enclosures (6) cc: J. L. Haas (MB12-1) D-27 Well File ~ ;' ' "-' LAd' ~' J. A. Bra~g} // Supervisor Production Operations A unit of the or,ginol Standard Oil Company Founded in Cleveland Ohio in 1870 STATE OF ALASKA ALASK '")IL AND GAS CONSERVATION COMb ';ION APPLICA1 FOR SUNDRY APPROVALS 1. Type of Request: Abandon ~ Suspend ~ Operation Shutdown ~ Re-enter suspended well ~ Al~er casing Time extension ~ Change approved program ~_ Plugging ~ Stimulate .~. Pull tubing ~ Amend order ~ Perforate r. Other 2, Name of Operator 5. Datum elevation (DF or KB) STANDARD ALASKA PRODUCTION COMPANY KBE = 71.91 feet 3. Address 6. Unit or Property name P. O. BOX 196612, ANCHORAGE, ALASKA 99519-6612 Prudhoe Bay Unit 4. Location of well at surface 1606' SNL, 1692' WEL, Sec. 23, TllN, R13E, UPM At top of productive interval 33' NSL, 1887' EWL, Sec. 14, TllN, R13E, UPM At effective depth 238' NSL, 1751' EWL, Sec. 14, TllN, R13E, UPM At total depth 253' NSL¢ 1740' EWL¢ Sec. 14¢ TllN¢ R13E~ UPM 11. Present well condition summary Total depth: measured 9784 feet Plugs (measured) true vertical 9210 feet BK~ 7. Well number D-27 (24-14-11-13) PBU 8. Permit number 86-33 9. APl number 50-- 029-21543 10. Pool Prudhoe 0il Pool Effective depth: measured 9741 feet Junk (measured) true vertical 9171 feet BKB Casing Length Size Cemented Structural ~__ Conductor. 67' 20"x30" 8 cu.yds. Surface 2632" 13 3/8" 3?20 c.f. Intermediate 8948' 9 5/8" 575 c.f. Production -- Liner 1028' ?" 340 c.f. Perforation depth: measured 9530' - 9560' true vertical (sUbsea) 8910' - 8937' Tubing (size, grade and measured depth) 4 1/2" L-80 to 8687' with 4 1/2"' tailpipe to 8808' Packers and SSSV (type and measured depth) 9 5/8" TIW packer at 8687'; 4 1/2" SSSV at 2073' 12.Attachments Measured depth 110' 2675' 8991' 8756'-9784' True Vertical depth BKB 110' 2675' 8483' 8263'-9210' Description summary of proposal [] Detailed operations program ~-~ BOP sketch 13. Estimated date for commencing operation January 1987 14. If proposal was verbally approved Name of approver Blair Wondzell Date approved 1/2/87 15. I hereby certify that the foregoin/~ is true and correct to the best of my knowledge sig~d ~,'~%J j0/~ %.~.~/LCL~.~~ Title Supervisor Production Operations Date 1/2/87 J. a. Brag~ [~ ~ Commission Use Only Conditions of approval Notify commission so representative may witness ~ Approval No..,~ ,/ ~ Plug integrity Q BOP Test Q Location clearancel,__, ....... ~_~ ..... ..,.., by order of Approved by ~,,~[~ ~.~,;,~;~ .... ~ AA~ Commissioner the commission Date /~' Form 10-403 Rev 12-1-85 Submit in triplicate Well D-27 (24-14-11-13) PBU STIMULATION PROPOSAL A bullheaded mud acid treatment is proposed for the following perforated interval in Well D-27. 9530' - 9560' MD BKB The treatment will consist of the following: 1500 gal. 15% HC1 2900 gal. 6% HC1 - 1.5% HF 1500 gal. 3% NH4C1 brine Ail treatment fluids will be nitrified with 300 SCF/STB. Treatment fluids will be displaced to the perforations with dead crude. The well will be retUrnedto production immediately after the stimulation and tested, jm 1/2/87 Standard Alaska P~oeluction Compan 900 East 8en$on P.O. Bo;~ 196612 Anchorage, Alaska 99519-6612 (907} ,564..5 ! I I INDEXED · DALLAS ARCO CHEVRON EXXON TEXACO Date: 09/22/86 o TO: MOBIL TI: 77349 PHILLIPS ~ STATE OF ALASKA GEOSCIENCES STANDARD ALASKA PRODUCTION REFERENCE: SAPC CASED HOLE FINAL LOGS The following material Is being submitted herewith. Please acknowledge receipt by signing a copy of this letter and retudning it to this office:  A=34A CBT ~ 02/08/86 #1 8700-9315 Sch 5" B-3A CET 02/15/86 #2 8900-9740 Sch 5" '~B-30 GCT 03/28/86 #1 15.2-10170 Sch 5" "~--D-27 GCT 03/15/86 #1 20-9593 Sch 5" ~H-7 CET 02/23/86 #1 9900-10966 Sch 5" ~M-2 EPL 02/11/86 #1 9700-10342 Sch 5" --'"'M-7 EPL 02/27/86 #1 9250-9770 Sch 5"  M-19 EPL~ 02/04/86 #1 9950-10592 Sch 5" N-8 EPL 01/28/86 #2 9950-9968 Sch 5" ~N-8 EPL 02/09/86 #3 9550-9969 Sch 5" ~"~-8 EPL 02/19/86 #4 9550-9970 Sch 5" ~""'R-15 EPL 02/02/86 #1 8500-9438 Sch 5" ~R-20 EPL 01/20/86 #4 11300-11900 Sch 5{' ~S-11 EPL 01/26/86 #1 9150-9650 Sch 5" ~"T~Y-10 EPL 02/12/86 #1 9050-9776 Sch 5" ~Y-13 EPL 02/26/86 #1 10250-10800 Sch 5" ___---~.~ / u.~ ~ ~ ~qRR ~ ~ Victoria Aldrid~e LR2-1 /'- ~ ' ~'"~' ~ I NFOR~TION CONTR~ D,~ / ' ~Oil& ~e$~ , , Well Records LR2-1 ~,,O~~'~,d"'" ~',00' C ..... , ..... , ~age Standard Alaska Production Company 900 East Ben$on Boulev, P.O. Box 196612 Anchowoge, Alosko 99519-6612 (907) 564-5 i I I INDEXED TO: DALLAS ARCO CHEVRON EXXON TEXACO MOBIL PHILLIPS STATE OF ALASKA' GEOSCIENCES (Transmittal Only) STANDARD ALASKA PRODUCTION Date: 09/11/86 TI: 77323 REFERENCE: SAPC FINAL DATA - PRESSURE SURVEY DATA The following material is being submlfted herewith. Please acknowledge receipt by signing a copy of this lel-ter and retu~nlng It to this office: ~ A-31 ~-A-34 % '-B-29 ~C-32 ---c-35 ~D-27 --D-29 %G-19 ~'"H-21 ~---H-22 %R-23 -'~U- 11 ~U-12 Flowing Gradient 08/19/86 " " 08/23/86 BHPD & PBU 08/10/86 Static 09/05/86 Static 08/30/86 Static 09/06/86 Static 08/29/86 Static ' 08/30/86 Static 09/04/86 Static' 08/20/86 Static 08/27/86 BHPD & PBU 08/08/86 BHPD & PBU 08/02/86 BHPD & PBU 08/02/86 Camco GO Otis Camco Otis C amc o Camco Otis Camco Camco GO GO GO Rece I ved Dat'e Victoria Aldridge LR2-1 I NFORh~T ~ ON CONTROL Wel I Records LR2-1 A u,,'t o! the o~,9~nol ~ounded m Cleveland. Ohio. ,n 1870 Standard Alaska Production Company 900 East Benson Bouk P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 564-5111 September 5, 1986 STANDARD ALASKA PRODUCTION Alaska 0il & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Well D-27 (24-14-11-13) PBU Gentlemen: Enclosed, in duplicate, is Form 10-404, Report of Sundry Well Operations, for the above-named well. This contains our subsequent report of perforating the well. Enclosures (4) cc: J. L. Haas (MB12-1) Well Records (LR2-1) w/10 D-27 Well File Yours very truly, P. F. Barth, Supervisor Reservoir/Production Surveillance Unit I A unit of the original Standard Oil Company Founded in Cleveland, Ohio, in 1870. STATE OF ALASKA ALAS OIL AND GAS CONSERVATION COM' SION REPORT UF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown ~ Stimulate ~ Plugging ~ Perforate ~ Pull tubing Alter Casing ~ Other '~ 2. Name of Operator 5. Datum elevation (DF or KB) STANDARD ALASKA PRODUCTION COMPANY KBE = 71.91 Feet 3. Address 6. Unit or Property name P. O. BOX 196612, ANCHORAGE, ALASKA 99519-6612 Prudhoe Bay Unit 4. Location of well at surface 1606' SNL, 1692' WEL, Sec. 23, TllN, R13E, UPM At top of productive interval 33' NSL, 1887' EWL, Sec. 14, TllN, R13E, UPM At effective depth 238' NSL, 1751' EWL, Sec. 14, TllN, R13E, UPM At total depth 253' NSL, 1740' EWL, Sec. 14, TllN, R13E, UPM 7. Well number D-27 (24-14-11-13) PBU 8. Approval number 183 9. APl number 50-- 029-21543 10. Pool Prudhoe Oil Pool 11. Present well condition summary Total depth: measured 9784 true vertical 9210 feet Plugs (measured) feet BKB Effective depth: measured 9741 true vertical 9171 feet Junk (measured) feet BKB Casing Length Structural -- Conductor 67 ' Surface 2632 ' Intermediate 8948 ' Production -- Liner 1028 ' 7" Perforation depth: measured 9530' - 9560' true vertical (subsea) 8910' - 8937' Size 20"x30" 13 3/8" 9 5/8" Cemented 8 cu.yds. 3720 c.f. 575 c.f. Measured depth 110' 2675' 8991' 340 c.f. Tubing (size, grade and measured depth) 4 1/2" L-80 to 8687' with 4 1/2" tailpipe to 8808' Packers and SSSV (type and measured depth) 9 5/8" TIW packer at 8687'; 4 1/2" SSSV at 2073' 12. Stimulation or cement squeeze summary Intervals treated (measured) Treatment description including volumes used and final pressure 8756'-9784' RECEIVED S EP 0 8 1986 Alaska 011 True Vertical depth BF, B 110' 2675' 8483' 8263'-9210' 13. Prior to well operation Subsequent to operation Representative Daily Average Production or Injection Data OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure 2730 1974 0 0 197 14. Attachments Daily Report of Well Operations Copies of Logs and Surveys Run ~ 15. I hereby certify that the foregoing is true and correct to the best of my knowledge ,:~.~ ~/--/7---¢,~:~ Signed ~' TitleSupvr. Res/Prod. Surveillance I Date ~ Form 10-404 Rev. 12-1-85 Submit in Duplicate PERFORATING DATA - Well D-27 (24-14-11-13) PBU 7/20/86 Pressure tested tubing and inner annulus. 8/13/86 Installed and tested lubricator to 3500 psi for all well work. Rigged'up Schlumberger and perforated the following interval for initial production using 2 7/8" Hyperdome guns at 4 spf: 9530' - 9560' MD (8910' - 8937' TVDss) Note: Ail depths are referenced to BHCS/GR, 2/24/86. Put well on production and tested. 8/27/86 Shut well in for initial static pressure survey . 8/29/86 Ran initial static pressure/temperature survey at 8800'TVDss. 9/2/86 Set and tested SSSV in ball valve nipple at 2073'. Well on production. jm 9/3/86 INDEXED DALLAS ARCO CHEVRON EXXON TEXACO ?0: MOBIL PHILLIPS --- GEOSCIENCES STANDARD ALASKA PRODUCTION Date: 08/22/86 TI: 77281 REFERENCE: SAPC FINAL DATA - PRESSURE SURVEY DATA The following material Is being submll"ted here~ith. Please acknowledge receipt by. signing a copy of thls lel~er and returning it to this office: B-27 Static Gradient D-24 " " D-25 " " D-26 " " D-28 " " H-7 " " R-8 Flowing Gradient R-18 " " 07/29/86 Camco 08/05/86 Camco 08/05/86 Camco 08/16/86 Camco 08/13/86 Camco 08/03/86 Camco 08/15/86 Camco 08/12/86 Camco ;~qch0ra§e Rece I ved Date Victoria Aldridge LR2-1 INFORHAT I ON CONTROL Wel I Records LR2-1 S,~andard Alaska Production Compan~ 900 East Benson Boule, P.O. Box 196612 Anchorage, Alaska 99519-6612 (907) 564-511 t June 13, 1986 STANDARD ALASKA PRODUCTION Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Well D-27 (24-14-11-13) PBU Gentlemen: Enclosed, in triplicate, is Form 10-403, Application for Sundry Approvals, for the above-named well. This contains our proposal to perforate the well. PFB: JAM _~ca Enclosures (9) cc: J. L. Haas (MB12-1) D-27 Well File Yours very truly, P. F. Barth, Supervisor Reservoir/Production Surveillance Unit I A unit of the original Standard Oil Company Founded in Cleveland, Ohio, in 1870. STATE OF ALASKA ALASK, IL AND GAS CONSERVATION COMM! 'ON APPLICATION FOR SUNDRY APPROVALS 1. Type of Request: Abandon ~ Suspend ~ Operation Shutdown ~ Re-enter suspended well ~ Alter casing 27 Time extension ~ Change approved program ~ Plugging ~ Stimulate ~; Pull tubing ~- Amend order ~ Perforate~f Other- 2. Name of Operator 5. Datum elevation (DF or KB) STANDARD ALASKA PRODUCTION COMPANY KBE = 71.91 feet 3. Address 6. Unit or Property name P. O. BOX 196612, ANCHORAGE, ALASKA 99519-6612 Prudhoe Bay Unit 4. Location of well at surface 1606' SNL, 1692' WEL, Sec. 23, TllN, R13E, UPM At top of productive interval 33' NSL, 1887' EWL, Sec. 14, TllN, R13E, UPM At effective depth 238' NSL, 1751' EWL, Sec. 14, TllN, R13E, UPM At total depth 253' NSL, 1740' EWL, Sec. 14, TllN, R13E, UPM 7. Well number D-27 (24-14-11-13) 8. Permit number 86-33 9. APl number 50--029-21543 10. Pool Prudhoe Oil Pool PBU 11. Present well condition summary Total depth: measured true vertical 9784 9210 Effective depth' measured 9741 true vertical 9171 Casing Length Size Structural , -,- Conductor. 67 ' 20"x30" Surface 2632 ' 13 3/8" Intermediate 8948 ' 9 5/8" Production __ Liner 1028' 7" Perforation depth: measured feet Plugs (measured) feet BKB feet Junk (measured) feet BKB Cemented 8 cu. yds. 3720 c.f. 575 c.f. Measured depth 110' 2675' 8991' 340 c.f. 8756'-9784' True Vertical depth BY, J3 110' 2675' 8483' 8263'-9210' true vertical Tubing (size, grade and measured depth) 4 1/2" L-80 to 8687' with 4 1/2" tailpipe to 8808' Packers and SSSV (type and measured depth) 9 5/8" TIW packer at 8687'; 4 1/2" ball valve nipple at 2073' 12.Attachments Description summary of proposal [] Detailed operations program BOP sketch 13. Estimated date for commencing operation June/July 1986 14. If proposal was verbally approved Nam~= of approver Date approved 15., I ~hereby certify that the for~'going Si~ed / /'- ~, P. F. Barth is true and correct to the best of my knowledge Title supvr. Res./Prod. Surveillance I Date Commission Use Only Conditions of approval Approved by Notify commission so representative may witness I Approval No. [] Plug integrity [] BOP Test [] Location clearanceI (/ F ~-*'~* ...... by order of Commissioner the commission Date Form 10-403 Rev 12-1-85 Submit in triplicate Well D-27 (24-14-11-13) PBU INITIAL PERFORATING PROPOSAL We propose to perforate the following interval for initial production during June/July 1986 at 4 spf: 9530' - 9576' MD (8910'-8951'TVDss)Ref. BHCS/GR, 2/24/86 A lubricator will be' installed and tested to 3500 psi for all well work. A SSSV will be set and tested in the ball valve nipple at 2073' at the completion of operations. jm 6/12/86 BASIC SYSTEM MAKEUP BOWEN PACKOFF' HAND PUMP GREASE SEAL FLOWTUBE F"LOWLINE GREASE LINE FLOWLINE VALVE GREASE )//~ 'MANIFOLD ,-~/~ GR EASE ~ PUMP RISER GREASE RESERVOIR BOP SOHIO ALASKA PETROLEUM COMPANY DALLAS AR(O CHEVRON EXXON TEXACO MARATHON TO: MOBIL PHILLIPS :~ STATE OF ALASKA BPAE (Transmittal Only) GEOSCIENCES 3111 "C" STREET ANCHORAGE. ALASKA TELEPHONE 1907l 265-0000 MAIL: POUCH 6-612 ANCHORAGE. ALASKA 99502 Date: 04/16/86 76998 T#: TELECO MAGNETIC DIRECTIONAL SURVEY (S) The following material is being submitted herewith. Please acknowledge receipt by signing a copy of this letter and returning it to this office:-- B-30 C-32 C-35 D-27 D-28 Y-22 TELECO ~5.~ Survey 2/S6 Job #474 TAK " " " 3/86 Job ~479 TAK " " " 3/86 Job #478 TAK " " " 2/86 Job #477 TAK " " " 3/86 Job #480 TAK " " " 3/86 Job #484 TAK Viccoria Aldridge- LR2-1 INFORMAT ION -CONTROL Wells Records-'LP2-! - SOHIO ALASKA PETROLEUM COMPANY DALLAS ARCO 3111 "C" ,~TF:I[£T ANCt,I()ftA(;[.. Al. A.~KA T[.L[:f'I"ION[ 1907) 265.0000 Ct{EVRON EXXON MAIL POUCH 6.612 ANCHORAG£, ALASKA 99502 DAL/UN iT/ T E,'G\ CO 03/13/86 To Date: S'FAT E' ~ IA.fLAT H O N HOBIL T.#: 76929 PtilLLIPS ,*STATE OF AK BPAE (Transmittal Only) *Date to State 3/31/8~ Via Drilling' CEOSCIENCES SOttlO OPEN HOLE FINAL LOC,S The lollowin§ maler~al ~s being subm~tled herewith. Please acknowledge receipt by signing a copy of this letter and returning it to this office:- DAL/UNIT/STATE - D-27 DIL/SFL/C,R 02/24/86 f:l 8982-9766 Sch 5" & 2" i)-27 BHCS/CR 02/24/86 ~71 8982-973! Sch 5" & 2" D-27 LDT/CNI.-Poro 02/24/86 ~:1 898?-9769 Sch 5" & 2" 1)-27 I. DT/CNL-Raw 02/24/86 ,:'/l 8982-9769 Sch 5" a 2" I3-27 Elect.Propagation 02/24/86 /.:l 8982-9750 Sch 5" & 2" D-27 RFT Interpretation 02/25/86 //i 903~1-9540 Sch 5" D-27 RFT Raw Data 02/25/86 //1 9036-9540 Sch 5" STATE ONLY' DIRECTIONAI, SURVEYS .May, netic Single Shot Directional 5t~rvov Cvro.~copjc I) irectiona] S~rvc~v D,~ T ( 02/13/8667~obt!. 0286-013 !)ate' 02/21/8 !)ate' 3/25/86 ,Job//' 71367 SOHIO ALASKA PETROLEUM COMPANY 900 EAST BENSON BOULEVARD ANCHORAGE, ALASKA TELEPHONE (907) 561-5111 P.O. BOX 6612 ANCHORAGE, ALASKA 99502-0612 April l, 1986 Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Attention' Mr, C. V. Chatterton Well D-27 (24-14-11-13)PBU Gentlemen' Enclosed in duplicate is Form 10-407, Well Completion Report, for the above'named well together with the Daily Drilling Reports, Well Logs and Directional Survey This well has been completed as a non-perforated oil well. Very truly yours, SOHIO ALASKA PETROLEUM COMPANY R. S..Allan Division Drilling Engineer RSA/MAW/pm/0211D Enclosure(s) cc: Jan Martin Dave Walters Well File #17 I ECEIYET) APR - ! 198G STATE OF ALASKA .... 1 6 N A t ALASK, ~ ,- ~NDGASCONSERVATION( ' ' SSI WELL COMPLETI .,, OR RECOMPLETIOk ;.,G;PORT AND LOG 1. Status of Well Classification of Service Well OIL [~: GAS [] SUSPENDED [] ABANDONED [] SERVICE [] 2. Name of Operator 7. Permit Number Standard Alaska Production Company 86-33 3. AddreSs ' 8. APl Number P. O. Box 196612, Anchorage, Alaska 99519-6612 . 50_ '029-21543 ... 4. Location of well at surface 9. Unit or Lease Name - PrUdhoe Bay Unit 1606' SNL, 1692' WEL, Sec. 23, Tll N, R13E, UM 10. Well Number At Top Producing Interval v~"i~J~l'-' ' D-27 (24-14-11-13) PB U 5247' SNL, 3393' WEL, Sec. 14 Tll N, R13E, UM : sur~.__j~_~ .. At Total Depth ~ B. ,-]. __.~ 1 1 Field and Pool 5027' SNL, 3540' WEL, Sec. 14, Tll N, R13E, UM 5. Elevation in feet (indicate KB, DF, etc.) I 6. Lease Designation and Serial No. Prudhoe Bay 71.91'=KBEI ADL 28285 Prudhoe 0fl Pool 12, Date Spudded 13. Date T.D. Reached 14. Date Comp., Susp. or Aband. I 15. Water Depth, if offshore [16. No. of Completions 02/13/86 02/24/86 03/01/86I N/A feet MSLI One 17. Total Depth (MD+TVD) 9784' M D 9210'TV D 18.Plug Back Depth (MD+TVD) 9741 ' M D 91 71 'TV D YES _~. 19. Directional SurveYNo[]I20' Depth where sssv set2073 feet MD I21' Thickness °f Permafr°st2000' 22. Type Electric or Other Logs Run DIL/SFL/GR, BHCS/GR, LDT/CNL-Poro, LDT/CNL-Raw, Elect. Propagation RFT Interpretation and raw data 23. CASING, LINER AND CEMENTING RECORD SETTING DEPTH MD CASING SIZE WT. PER FT. GRADE TOP BOTTOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED 20" " C o Iductor Surfac .~ 110' 36" 8 cu, yds, concrete 13-3/8" 72# L-80 Surfac.~ 2675' 17-1/2" 3255 cu. ft Permafrost E, 465 Cu, ft Perm 9-5/8" 47# L-80 Surfac.~ 8991' 12-1/4" 575 cu. ft Class G +1 % CFR 2 "' ' .1% HR-7 '7"' 29# L-80 I 8756' 9784' 8-1/2" 340 cu. ft Class G w/5% K CL. +.3% Hala 24, Perforations open to Production (MD+TVD of Top and Bottom and 25. TUBING RECORD 1 interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD) 4-1/2"12.6 L-; lO 8808' 8687' 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. DEPTH INTERVAL (MD) AMOUNT& KINDOF MATERIAL USED 9-5/8"X13-3/8" 285 cu. ft Permafrost Annulus Downsqueeze followed by 125 hh' crt~_~e o~ 27. PRODUCTION TEST Date First Production Method of Operation (Flowing, gas lift, etc.) Date of Test Hours Tested PRODUCTION FOR OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE GAS-OIL RATIO TEST PERIOD Flow Tubing Casing Pressure CALCULATED OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-APl (corr) Press. 24-HOUR RATE 28. CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips. RECEIVED APR O 1 1986 Alaska 0ii & Gas Cons. (;0mmissi0n Anchorage ~frost d24+ s of Submit in duplicate Form 10-407 Rev. 7-1-80 CONTINUED ON REVERSE SIDE 29, NAME Sag Shublik A Zone 4 Top Ivishak/ Sadlerochit GEOLOGIC MARKERS MEAS. DEPTH 9020' 9049' 9137' TRUE VERT. DEPTH 8510' 8537' 8620' FORMATION TESTS Include interval tested, pressure data, all fluids recovered and gravity, GOR, and time of each phase. 3:1. LIST OF ATTACHMENTS 32. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed , ' Title Date INSTRUCTIONS General' This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Item 1' Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5' Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). , IlII! Item 23' Attached supplemental r~cords for this well should show the details of any multiple stage cement- ing and the location of the cementing tool. Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In- jection, Gas Injection, Shut-in, Other-explain. Item 28' If no cores taken, indicate "none". Form 10-407 Sohio Daily Drilling Report -- PBU February 13, t986 at 0600 hours Rig: Nabors 18-E Well' D-27 (24-14-11-13) AFE # 120379 0600 Depth' O' Day' -1 24-Hour Ftg' O' Water Used' 0 Current Operation' Rigging up. Accept rig on D-27 at 0100 hrs. 2/13/86. Rigging up. MUD TYPE- WT' VIS' PV- YP- FL' SOLIDS' TEMP- °F SURVEY MD ANGLE DIRECTION TVD SECTION _ COORDI NATES DLS 0576H' RECEIVED APR O i 1986 Anchora9~ Sohio Daily Drilling Report -- PBU February 14, 1986 at 0600 hours Rig- k~abors 18-E Well- D-27 (2_4-14-11-13) AFE # 120379 0600 Depth' 2036' Day' 1 24-Hour Ftg' 1926' Water Used' 3450 Current Operation' Drilling. Spud D-27 at lO00 hrs. ~/13/86. Drill to 538'. Drill to 1600'. Trip for bit. Drilling at 2036'. Trip for bit. MUD TYPE- WT:9.1 VIS'210 PV-14 YP:32 FL'18 SOLIDS'5 TEMP' °F SURVEY MD ANGLE DIRECTION TVD SECTION COORDINATES DLS 0576H' Sohio .naily Drilling Report -- Pt31_I February 15, 1986 at 0600 hours Rig: Nabors 18-E Well' D-27 (24-14-11-13) AFE # 120379 0600 Depth' 2700' Day' 2 24-Hour Ftg' 664' Water Used' 575 Current Operation' Installing wellhead. Drilled to 2700'. Short trip.. CBU. POH. Ran 67 its. 13-3/8" casing to 2675'. Cemented with 3255 cu. ft. Permafrost E followed by 465 cu. ft. Permafrost. Good surface returns. Install lng wellhead. MUD TYPE- WT'9.5 VIS'88 PV'14 YP-18 FL'21.O SOLIDS'8.0 TEMP'52°F SURVEY MD ANGLE DIRECTION TVD SECTION COORDINATES DLS 0576H' Sohio Daily Drilling Report -- PBU February 16, 1986 at 0600 hours Rig' Nabors 18-E Well- D-27 (24-14-11-13) AFE # 120379 Current Operation- 0600 Depth' 3550' Day' 3 24-Hour Ftg' 850' Water Used' 2900 NU and teSt BOPE. RIH to FC and test to 3000 psi. Drill cement and float equipment. Drill to 2730'. Ran LOT to 64 psi/ft. Drilling at 3550'. ' MUD TYPE- WT' 9.0 VIS'33 PV-4 YP'3 FL'25.0 SOLIDS:4.5 TEMP-70°F SURVEY MD 1 2840 3 3025 5 3339 ANGLE DIRECTION TVD SECTION COORDINATES 3.3 N45.5W 2840 4 3 3 4.7 N61 . 3W 3025 16 9 13 7.6 N55.3W 3337 48 26 41 DLS .,, 2.36 1.19 1.25 0576H' Sohio Daily Drilling Report -- PBI! February 17, 1986 at 0600 hours Rig: Nabors 18-E Nell: D-27 (24-14-11-13) AFE # 120379 0600 Depth: 5385' Day: 4 24-Hour Ftg' 1835' Water Used: 1750 Current Operation: Tripping for bit change. Drill to 4161'. Trip for bit. Drill to 5385'. Trip for bit. MUD TYPE- WT:9.3 VIS:35 PV:5 YP:5 FL:IO.O SOLIDS:6.5 TEMP:76°F SURVEY MD ANGLE DIRECTION TVD SECTION COORDINATES DLS 7 3653 13.1 N51.8W 3646 102 9 3964 20.6 N49W 3943 192 ll 4571 27.7 N45.1W 4493 450 13 5317 28.4 N41.3W 5151 800 59 86 2.06 116 155 2.45 292 343 0.81 548 582 0.23 0576H: Sohio Daily Drilling Report -- PBU February 18, 1986 at 0600 hours Rig: ~!abors 18-E Well' D-27 (24-14-11-13) AFE # 120379 Current Operation' RIH. Trip for bit. 0600 Depth- 6269' Day' 5 24-Hour Ftg' 884' Water Used' 1750 Drill to 6269'. Trip for Dynadrill. MUD TYPE- WT:9.3 VIS'35 PV:5 YP:4 FL'9.8 SOLIDS'6.8 TEMP' 77°F SURVEY MD ANGLE DIRECTION TVD SECTION · COORDINATES DLS 14 $818 27.7 N41.3W 5593 1034 725 15 6185 27.2 N39.9W 5919 1203 854 738 848 0.14 0.22 0576H- Sohio Daily Drilling Report -- PBU February 19, 1986 at 0600 hours Rig' Nabors 18-E Well: D-27 (24-14-11-13) AFE # 120379 0600 Depth' 7152' Day' 6 24-Hour Ftg' 883' Water Used: 1050 Current Operation' Drilling. Dynadrill to 6385'. Trip for bit and BHA. Drilling at 7152'. MUD TYPE- WT'9.4 VIS'34 PV-5 YP'4 FL'7.6 SOLIDS'8 TEMP'79°F SURVEY MD ANGLE DIRECTION TVD SECTION COORDINATES DLS 16 6321 28.5 N45.5W 6039 1266 900 891 2.15 17 6403 29.8 N49.4W 6111 1306 927 920 2.81 18 6898 26.2 N58.4W 6548 1 538 1077 1098 O. 73 0576H' Sohio Daily Drilling Report -- PBU February 20, 1986 at 0600 hours Rig: Nabors 18-E Well: D-27. (24-14-11-13) AFE # 120379 0600 Depth: 8152' Day: 7 24-Hour Ftg: 1000' Water Used: 44 Current Operation: POH. Drill to 7464. Trip for bit and BHA. Drill to 8152'. POH MUD TYPE- WT:9.7 VIS:39 PV:9 YP:5 FL:5 SOLIDS:lO.5 TEMP:83°F SURVEY MD ANGLE DIRECTION TVD SECTION COORDINATES DLS 19 7397 22.1 N48.7W 7003 1742 1209 1253 O. 83 20 7714 21 . 1 N47.6W 7298 1858 1287 1340 O. 34 21 8026 23.1 N~O. 9W 7587 1975 1371 1422 1.03 0576H: Rig: Nabors 18-E Well: D-27 (24-14-11-13) · Sohio Daily Drilling Report -- PBU February 21, 1986 at 0600 hours AFE # 120379 0600 Depth: 8925' Day: 8 24-Hour Ftg: 773' Water Used: 1750 Current Operation: Drilling. Trip for bit and BHA. Ream to 8152'. Drilling at 8925'. MUD TYPE- WT:9.7 VIS:38 PV:7 YP:5 FL:5.2 SOLIDS:lO.5 TEMP: 91 °F SURVEY MD ANGLE DIRECTION TVD SECTION COORDINATES DLS 22 8524 22.2 N36.7W 8046 2166 1521 1542 O. 37 0576H: Sohio Daily Drilling Report -- PBU February 22, 1986 at 0600 hours Rig: Nabors 18-E Well: D-27 (24-14-11-13) AFE # 120379 0600 Depth: 8996' Day: 9 24-Hour Ftg: 71 ' Water Used: 1225 Current Operation: Rig down cementers. Drill to 8996'. Short trip. POH. and cemented with 500 sks Class G. Ran 9-5/8" casing to 8991' MUD TYPE- WT:9.7 VIS:36 PV:7 YP:6 FL:5.4 SOLIDS:lO.5 TEMP: N/A°F SURVEY MD ANGLE DIRECTION TVD SECTION COORDINATES DLS _ 0576H: Sohio Daily Drilling Report -- PBU February 23, 1986 at 0600 hours Rig: Nabors 18-E Well- D-27 124-14-11-13 ) AF£ # 120379 0600 Depth' 9100' Day: lO 24-Hour Ftg: 104' Water Used: 1050 Current Operation' Drilling 8-1/2" OH. Installed and tested packoff to 5000 psi. Test BOPE. RIH and drilled FC and cement to 8920'. Test casing to 3000 psi. Drilling 8-1/2" hole at 9100'. MUD TYPE- WT-8.9 VIS:35 PV:6 YP:4 FL-8.5 SOLIDS-8.5 TEMP- N/A°F SURVEY MD ANGLE DIRECTION TVD SECTION COORDINATES DLS , , 0576H: Sohio Daily Drilling Report -- PBU February 24, 1986 at 0600 hours Rig' Nabors 18-E Well- D-27 {24-14-11-13) AFE # 120379 0600 Depth' 9784' Day: ll 24-Hour Ftg' 684' Water Used: 2900 Current Operation' Circulating. Drill to TD at 9784'. Short trip. CBU. MUD TYPE- WT'8.9 VIS:33 PV:4 YP:3 FL'lO SOLIDS:4 TEMP:87°F SURVEY MD ANGLE DIRECTION TVD SECTION COORDINATES DLS 0576H: Rig' Nabors 18-E Well- D-27 (24-14-11-13) Sohio Daily Drilling Report -- PBU February 25, 1986 at 0600 hours AFE # 120379 AFE Amount: Current Amount: 0600 Depth' 9784' Day' 12 24-Hour Ftg' O' Water Used' 350 Current Operation' RIH~ Ran open hole logs and RFT. RIH for wiper trip. MUD TYPE- WT: 8~ 9 VIS-36 PV-6 YP-5 FL'lO SOLIDS:4 TEMP' N/A°F SURVEY MD ANGLE DIRECTION TVD SECTIO~ COORDINATES DLS .i 0576H: Sohio Daily Drilling Report -- PBU February 26, 1986 at 0600 hours Ri g: Nabors 18-E Well- D-27 (24-14-11-13) AFE # 120379 0600 Depth' 9784' Day' 13 24-Hour Ftg: O' Water Used' 350 Current Operation' RIHj Ran 7" liner with shoe at 9784' and top of liner at 8756" Cemented with 340 cu. ft. Class G with 5% KCL. POH. RIH with 8-1/2" bit and 9-5/8" scraper. MUD TYPE- WT:9~O VIS'41 PV:7 YP-6 FL-9.6 SOLIDS:4.5 TEMP-115°F SURVEY MD ANGLE DIRECTION TVD SECTION COORDINATES' DLS 0576H' Sohio Daily Drilling Report -- PBU February 27, 1986 at 0600 hours Rig: Nabors 18'E AFE # 120379 Well: D-2.7 (24-14-11-13) 0600 Depth' 9741' Day' 14 24-Hour Ftg' O' Water Used' 350 Current Operation: Circ, RIH and tag cement at 8553'. Drill cement to TOL at 8755" CBU~ POH. RIH with 6" bit and clean out inside liner from 8756' to 9741'. CBU. MUD TYPE- WT-9'O VIS'42 PV:8 YP:7 FL'lO.8 SOLIDS'4.5 TEMP:83°F SURVEY MD ANGLE DIRECTION TVD SECTION COORDINATES'' DLS 0576H- Rig: Nabors 18-£ Well: D-27 (24-14-11-13).-. · Sohio Daily Dril ling, Report -- PBU February 28, 1986 at 0600 hours ': AFE # 120379 0600 Depth- 9741' Day' 15 24-Hour Ftg- O' Water Used- 875 Current Operation' Running tbg. Clean tanks and mix 9.6 ppg brine. Displace mud w/9~6 ppg brine~ Press test 9-5/8" casing, 7" liner and lap to 3000 psi' Rev~ circulate one hole vol. w/9.6 ppg brine. Rig up and run 4-1/2" tubing. MUD TYPE- WT:9~6 VIS'NaC1 brine PV' YP- FL' SOLIDS' TEMP'°F SURVEY MD ANGLE DIRECTION 'TVD SECTION COORDINATES DLS 0576H- Sohio Daily Drilling Report -- PBU Mar. ch 1. 1986 at 0600 hours Rig: :Nabors 18-E Well: D-27 (24-14-11-13) AFE # 120379 0600 Depth: 9741' Day' 16 24-Hour Ftg: O' Water Used- 350 Current Operation: Moving rig.- Run 4-1/2" tbg. to 8808, Packer at 8687. Nipple down BOPEj Nipple up tree. Displace tbg. w/ diesel. Set and test packer~ Downsqueeze 13-3/8" x 9-5/8" annulus w/ 51 bbl. Permafrost CJ Displace w/125 bbl. crude. Release rig e OlO0 hrs. on 3/1/86j MUD TYPE- WT'9 6 VIS'NaC1 brine PV- YP- FL' SOLIDS- TEMP-°F SURVEY MD ANGLE DIRECTION TVD SECTION COORDINATES"' DLS 0576H' SOHIO ALASKA PETROLEUM C(~ PAD.D (24.14-11.1:5) D'27 Controlled, Drilling Consultants, Inc. LES HENDERSON 333-1552 CON,nOLLED DRILLING CONSULTANTS, INC. 4234 '.KINGSTON DR. Anchorage, Alaska 99504 (907) 333-1552 February 24, 1986 Mr. Brian Rose Sohio Alaska Petroleum Company Pouch 6-612 Anchorage, AK 99502 RE: Magnetic Single Shot Survey Job No. 0286-013 Well D - 27 (24-14-11'13) Prudhoe Bay Field North Slope, Alaska Date of Survey: 02,13-86 to 02-21-86 Dear Mr. Rose: Please find enclosed the "Original" and six (6) copies of our Magnetic Single Shot Survey on the above well. The method used in calculating this survey was Radius of Curvature. The depth of the survey was 2700 to 8937. Thank you for giving us this opportunity to be of service. Yours very truly, Controlled Drilling Consultants, Inc. Wayland Yancy Directional Supervisor .. . ;::' ? - ,, ., · ., 'HORIZONTAL VIEW ' -SOHIO ALASKA PETROLEUM WELL D-27 (24-t4-11-13) -MAGNETIC ~INGLE SHOT i . j , ~ ....................................... I ' Teleco Oilfield S~ ~s of Alaska Inc, 6116 Nielson Was Anchorage, AK 99502 (907) 562-2646 February 26, 1986 JOB #477 TAK SOHIO WELL: D-27 PRUDHOE BAY NABORS ]8E Please find attached a copy of the computer calculated MWD directional surveys for the above mentioned well. We at Teleco appreciate this opportunity to provide service to Sohio. Teleco is committed to providing the highest quality of service and we would welcome any comments or questions concerning these surveys or any of our other services. Sincerely, Pat Havard Field Service Supervisor PH/el Enclosures RECI iV D A ~i/I[T COMPANY TLLECO 0 ~ 1C ~ m ~ d S~cv ~ c~s VERT I CAL PRO~TECT I ON -F O_ DJ _d U 0 2000 BOOO 4000 5000 6000 1 ODD 2000 BOOO 4000 5000 6000 7000 8000 gO00 10000 1 ! 000 VI:'I~T T r'At c;:~'r" T T nl,,,! TELECO Oi 1 ~ i el d Servi c~s PLAN VIEW WEST (ft) 2400 2000 1600 1200 800 400 0 3600 3200 2800 2400 aooog F- rY 0 16002 1200 BO0 400 TELECo OI[J~IELD SERVICES JOB ~77 SURVEY C AL CULA TIONS Date Page 02/26/8 6 Company: SOHIO ~ Well: D-27 Location' PRUDHOE BAY Rig: NABORS 18E TELECO Job # Grid Correction: Magnetic Declination: Total Correction: Proposed Direction: ~77 TAK / 0.00 degrees 31.50 degrees 31.50 degrees 313.72 degrees RADIUS OF CURVATURE CALCULATION MEAS DIRECTION TRUE V ERTI C AL COORDINATES DOG LEG D~PTH INCL AZIMUTH BEARING VERT DEPTH SECTION N/S E/W SEVERITY feet deg deg deg/min feet feet feet feet deg/lO0' **************************************************************************************************** VERTICAL TIE IN 2700.00 0.0 31a.5 N a5 30 W 2700.00 0.00 O.OON O.OOE TELECO MWD 28a0.00 3.3 31a.5 N a5 30 W 2839.92 a.03 2.82N 2.87W 2.357 2932.00 3.6 299.7 N 60 18 W 2931.75 9.51 6.15N 7.27W 1.019 3025.00 a.7 298.7 N 61 18 W 302~.51 16.03 9.aaN 13.15W 1.186 3183.00 5.8 298.3 N 61 a2 W 3181.8a 29.97 16.3aN 25.85W .697 3339.00 7.6 30~.7 N 55 18 W 3336.77 ~7.75 25.8aN a1.36W 1.2a8 TELECO Job # ~77 TAK / 02/26/86 Pag.e 2 MEAS DIRECTION TRUE VERTICAL COORDINATES DOG LEG DEPTH INCL AZIMUTH BEARING VERT DEPTH SECTION N/S E/W SEVERITY feet deg ~deg deg/min feet feet feet feet deg/lO0' **************************************************************************************************** 3~97.00 9.9 306.8 N 53 12 W 3ag2.92 71.55 39.88N 60.86W 1.~69 3653.00 13.1 308.2 N 51 a8 W 36a5.77 102.a7 58.81N 85.5aW 2.059 3808.00 16.8 309.6 N 50 2a W 3795.50 la2.30 83.92N 116.65W 2.398 396~ .O0 20.6 311.0 N ~900 W 39~3.23 192.22 116.26N 15~ .79W 2 .a53 ~O87.00 2~.0 312.0 N ~8 O0 W a057.02 238.85 1~7.1~N 189.7aW 2.781 a571.00 27.7 31~.9 N ~5 06 W ~92.51 a~9.82 292.27N 3~2.90W .808 5070.00 28.1 317.7 N a2 18 W a933.51 683.06 a61.07N 50a.20W .275 5317.00 28.a 318.7 N al 18 W 5151.09 799.61' 5a8.22N 582.12W .227 5818.00 27.7 318.7 N ~ 18 W 5593.2a 103~.30 725.29N 737.52W .laO 6185.00 27.2 320.1 N 39 5a W 5918.92 1202.6a 853.7aN 8a7.61W .223 6321.00 28.5 31a.5 N ~5 30 W 6039.16 1266.02 900.~1N 890.67W 2.1a7 6~O3.00 29.8 310.6 N ~9 2~ W 6110.78 1305.95 927.a2N 920.09W 2.806 6898.00 26.2 309.6 N 50 2a W 65a7.76 1537.83 1077.08N 1097.82W .733 7397.00 22.1 311.3 N a8 a2 W 7002.99 17al.60 1209.50N 1253.1aW .833 771a.00 21.1 312.a N a7 36 W 7297.73 1858.23 1287.35N 13aO.O6W .3aO 8026.00 23.1 319.1 N aO 5a W 7586.79 1975.a7 1371.38N 1a21.92W 1.030 852a.00 22.2 323.3 N 36 a2 W 80a6.38 2165.57 1520.81N 15a2.06W .372 TELECO Job # "77 TAK / 02/26/86 Page 3 MEAS DIRECTION TRUE ' VERTICAL COORDINATES DOG LEG DEPTH INCL AZIMUTH BEARING VERT DEPTH SECTION N/S E/W SEVERI."~f feet deg deg deg/min feet feet feet feet deg/lO0' **************************************************************************************************** 8959.00 20.1 32u.7 N 35 18 W 8u52.05 2319.99 16U7.77N 163U.30W .u97 SUB. SURFACE DIRECTIONAL $URVEY [~UIDANCE E~ONTINUOUS I~OOL Company Well Name Field/Location STANDARD ALASKA PRODUCTION COMPANY WELL D-27 (1606'$N-L, 1692'WEL, S23, TllN, R13N) PRUDHOE BAY, NORTH SLOPE, ALASKA Job Reference N,.o,. 71367 Logc3ed By; LESNIE Date_ 25-MAR-86 Computed OGDEN GCT OIRECTi3NAL SURVEY CUSTOMER LISTING FOR STANDARO 4L~SK4 PRODUCTION CO 0-27 PRUDHOE BAY NORTH SLOPE,ALASKA SURVEY DATE: 15-MAR-86 :NGIN=:R:~ ~. LESNIE METHODS OF COMPUTATION TOOL LOCATION: TANGENTIAL- AVERAGED OEVI4TION AND 4ZIMUTH INTERPOLATION: LINEAR VERTICAL SECTION: HORIZ. DIST. PROJECTED ONTO A TARGET AZIMUTH OF NORTH 47 DES 17 MIN NEST ST~ND~RD ALASKA PRODUCTION CO PRUDHOE B~Y NORTH SLOPE,ALASKA r,~ mm~,~lOTI ZNTE~DL~TED V~LUES FOR ~V~N ~O0-D~T DF ~EASUR~D DEPTH TRUE SUB-SE~ COURSE E~SURED VERTZC~L VERTZCAL DEVZ~TZON AZZHUTH DEPTH DEPTH DEPTH D~G ~ZN DEG HZN PAGE DATE OF SURVEY: 15-MA~-86 KELLY BUSHING ELEVATION: ENGINEER: LESNIE 71.91 FT VERTICAL DOGLEG RE:T~NGULAR COORDINATES H]RIZ. DEPARTURE SECTION SEVERITY NORTH/SDUTH EAST/WEST DIST. ~ZIMUTH FEET DEG/iO0 FEET FEET FEET DES MIN 0.00 0.00 -71.91 0 0 N 0 0 E 0.00 0.00 0.00 N 100.00 100.00 28.09 0 16 S 25 29 W -0.09 0.12 0.33 S 200.00 200.00 128.09 0 12 S 31 2 W -0.20 0.11 0.69 S 30A.O0 300.00 228.09 0 12 S 31 37 W -0.26 0.12 0.99 S  O0 400,00 328.09 0 16 S 32 26 W -0.38 0.15 1.38 S · 00 500.00 428.09 0 15 S 28 I W -0.46 0.10 1.78 S 600.00 599.99 528.08 0 15 S 4 58 W -0.66 O.1Z 2.21 S 700.00 699,99 528.08 0 14 S 1 48 E -0,96 0.03 2.65 S 800.OO 799.~9 728.08 0 15 S 12 11 E -1'28 0.18 3.05 S 900,00 899.99 828.08 0 14 S 71 6 E -1.61 0.55 3.34 S 0 27 S 89 38 E -2.10 0.08 3.38 S 0 39 S 87 14 E -2.81 0,13 3.38 S 0 38 S 82 3 E -3.72 0.33 3.51 S 0 35 S 64 10 E -4.72 0.51 3.79 S 0 27 S 48 17 E -5,63 0.24 4.30 S 0 30 S 48 18 E -6.4t' 0.35 4.81 S 0 27 S 50 46 E -7.31 0.21 5.39 S 0 19 S 43 i E -8.01 0.29 5.86 S 0 14' S 19 22 E -8.52 0.16 6.29 S 0 15 S 24 18 E -8.88 0.11 6.54 S 1000.00 999.99 928.08 1100.00 1099.99 1028.08 1200.00 1199.98 1128.07 1300.00 1299.97 1228.06 1400.00 1399.97 1328.06 1500.00 1499.96 1428.05 1600.00 1599.96 1528.05 1700.00 1699.96 1628.05 1800.00 1799.96 1728.05 1900.00 1899.96 1828.05 0 17 S 18 10 E -9.27 0.26 7.04 S 0 31 S 19 19 E -9.89 0.09 7.71 S 0 38 S 22 47 E -10.74 0.18 8.63 S 0 39 S 26 51 E -11.83 0.38 9.65 S 0 41 S 28 31 E -12.98 0.34 10.68 S 0 33 S 28 1 E -14.10 0.74 11.71 S 0 27 S 35 8 a -14.88 0,11 12.39 S 0 10 S 11 43 E -15,43 0.40 12.92 S 2 18 N 51 20 W -13,98 3.52 12.08 S 3 26 N 55 55 W -8,54 0,61 8.79 S 2000.00 1999.96 1928,05 2100.00 2099.95 2028.04 2200.00 2199.95 2128.04 2300~00 2299.94 2228.03 ~ lO 2399.93 2328.02 ~ JO 2499.93 242~,02 2600.00 2599- 92 2528.01 2700.00 269'9.92 2628.01 2800.00 2799-90 2'727.99 2900.00 2899.75 2827.84 N 62 11 W -1.99 1.23 5.40 S N 64 39 W 5.86 1.01 1.86 S N 61 15 W 14.98 1.95 2.43 N N 58 25 W 25.18 1.87 8.21 N N 55 41 W 39.60 1.51 15.63 N N 53 48 W 55.50 1.51 24.92 N N 52 36 W 74.46 1.65 36.36 N N 52 12 W 97.03 2.54 50.16 N N 51 17 W 1,23.45 2.15 N 50 23 W 154.00 2.29 3000.00 2999,$2 2927.61 4 17 3100.00 3099,19 3027.28 4 57 3200.00 3198.73 3125.82 6 2 3300.00 3298.07 3226.16 7 9 3400.00 3397.14 3325.23 8 29 3500.00 3495.84 3423.93 9 58 3500'00 3594,00 3522,09 12 7 3700.00 3691.39 3619.48 14 12 3800.00 3787,80 3715.89 16 36 3900.00 3883.00 3811.09 19 8 0.00 E 0.17 W 0.37 W 0.57 W 0.77 W 1.01 W 1.14 W 1.15 W 1.07 W 0.89 W 0.00 N 0 0 E 0.37 S 27 50 W 0.78 S 28 8 W 1.14 S 29 48 W 1.58 S 28 57 W 2.05 S 29 39 W 2.48 S 27 16 W 2.89 S 23 21 W 3.23 S 19 20 W 3.46 S 14 52 k4 0.27 W 0.71 E 1.82 E 2.92 E 3.70 E 4.37 E 4.98 E 5.50 E 5.79 E 5.95 E 3.40 S 4 36 W 3.45 S 11 50 E 3.95 S 27 20 E 4.79 S 37 40 E 5.67 S 40 40 E 6.50 S 42 15 E 7.34 S 42 42 E 8.03 S 43 11 E 8.55 S 42 40 E 8.92 S 41 51 E 6.12 E 6.34 E 6.66 E 7.20 E 7.81 E 8.38 E 8.80 E 9.07 E 7.88 E 3,51 E 9.33 S 41 1 E 9.98 S 39 25 E 10.90 S 37 39 E 12.04 S 36 42 E 13.23 S 36 10 E 14.40 S 35 34 E 15.20 S 35 23 E 15.79 S 35 4 E 14.42 S 33 7 E 9.46 S 21 44 E 2,27 W 9,69 W 18.14 W 28.05 W 39'47 W 52.53 W 67.78 W 85.75 W 5.86 S 22 48 W 9.87 S 79 7 W 18.30 N 82 21 W 29.23 N 73 40 W 42.45 N 68 23 W 58.14 N 64 37 W 75.91 N 61 47 W 99.35 N 59 40 W 55.54 N 106.58 W 125.65 N 58 1 W 85.90 N 130.30 W 156.07 N 56 36 ~ CDMPUT~TI3N DATE: 21-M&R-85 PAGE 2 STANDARD AL~SK~ PRDOUCTION CO D-27 PRUDHOE B~Y NORTH SLDPE,AL~SK~ INTERPOLATED TRUE SdB-SE~ MEASURED VERTICAL VERTICAL DEPTH DEPTH DEPTH VALUES FOR CDURS DEVIATION A DEG MIN D 4000.00 3976.77 3904.86 21 32 N 4100.00 4068.84 3995.93 24 26 N 4200.00 4159.09 4087.18 26 3 N 4~nO.O0 4248.74 4175.83 26 29 N ~ ).00 4338.13 4266.22 26 48 N 4'>~0.00 4427.22 4355.31 27 8 N 4500,00 4516.13 4444.22 27 19 N 4700.00 4604.92 4533.01 27 29 N 4800.00 4693.59 4621.68 27 37 N 4900.00 4782.09 4710.18 27 39 N 5000.00 4870.64 4798'73 27 50 5100.00 4958.96 4887.05 28 1 5200.00 5047.16 4975.25 28 2 5300.00 5135,52 5063.61 27 59 5400.00 5223.79 5151.88 28 3 5500,00 5311.95 5240.04 28 12 5500.00 5400.15 53Z8.24 28 3 5700.00 5488.43 5415.52 27 53 5800.00 5576.94 5505.03 27 30 5900.00 5665.80 5593.89 27 14 6000.00 5754.69 5682.78 27 9 6100.00 5843.70 5771.79 27 5 6200.00 5932.83 5860.92 26 55 637q~00 6021.76 5949.85 27 52 6~ j O0 6109.~5 6037.54 29 20 6.006196.566124.65298 6500.006284.066212.152840 6700.006372.156300.242750 6800.00 6460.g9 638g.08 26 48 6900.006550.556478.64260 7000.00 6640.71 6568.80 25 12 7100.00 6731.52 6659.61 24 18 7200.00 6822.97 6751.06 23 30 7300.00 6914.86 6842.95 22 50 7400.00 7007.35 6935.44 21 50 7500.00 7100.34 7028.43 21 24 7600.00 7193.49 7121.58 21 16 7700.00 7286.54 7214.73 21 9 7800L00 7379.99 7308.08 21 8 7900.00 7473.09 7401.18 21 47 E ZIMUTH EG MIN 49 35 W 48 26 W 47 44 W 47 43 W 47 31 W 47 11W 46 54 W 46 10 W 45 5 ~ 44 34 W N 44 8 W N 43 54 W N 43 48 W N ~3 15 W N 43 1W N 42 58 W N 43 OW N 43 5 W N 42 54 W N 42 20 W 42 2 W 41 47 W 41 52 W 45 21 W 50 42 W 51 11 W 51 8 W 50 54 W 50 55 W 51 1 W 51 14 W 51 14 W 51 I1 W 51 8 W 51 9 W 51 13 W 50 39 W 50 4 W 49 10 W 46 53 W EVEN 100 VERTICAL SECTION FEET 188.68 227.63 270.69 315.00 359.84 405.25 451.00 497.02 543.24 589.76 DOGL SEVE DEG! D&TE DF SURVEY: 15-M&R-86 KELLY BUSHING ELEVATION: 71.91 FT ENGINEER: LESNIE T OF MEASURED DEPTH EG RECTANGULAR RITY NORTH/SgUTH 100 FEET 2.48 108.21 N 2.97 133.75 N 0.55 162.60 N 0.25 192.41 N 0.46 222.61 N 0.23 253.34 N 0.24 284.54 N 0.56 316.15 N 0.32 34~.52 N 0.76 381.48 N 536.16 0.34 414.70 682.98 0.44 448.47 730.02 0.56 482.39 776.73 0.33 516.35 823.62 0.14 550.67 870.68 0.17 585.17 917.68 0.16 619.66 964.51 0.33 553,98 1010.92 0.69 687,98 1056.64 0.25 721.75 1102.27 1147.66 1192.78 1238.36 1286.38 1335.40 1383.69 1430.92 1476.75 1521.12 0.53 755. 0.42 789. 0.42 823. 3.65 856. 1.00 888. 0.73 919. 0.70 949. 0.64 979. 0.91 1008. 0.85 1036. 0.83 1063. 0.88 1089. 0.37 1115. 0.85 1140. 0.73 1163. 0.25 1185. 0.35 1209, 0.67 12.33. 0.63 1255. 1.27 1280. 1564.26 1606.05 1646.42 16:J 5.76 1723.69 1760.40 1796.70 1832.99 1868.84 1905.34 COORDINATES HORIZ. EAST/WEST DIST. FEET FEET OEPARTURE 4ZIMUTH DEG MIN 156.89 W 190.59 186.33 W 229.37 218.30 W 272.20 251.10 W 316.34 284.22 W 36!.03 317.66 W 406.31 351,13 W 451.95 384.57 W 497.84 417.59 W 543.92 450.48 W 590.30 N 55 24 W N 54 19 W N 53 19 W N 52 32 W N 51 55 W N 51 25 W N 50 58 W N 50 34 W N 50 9 W N 49 44 W 482.96 W 536.57 515.50 W 683.28 548.21 W 730.23 580.43 W 776.87 612.56 W 823.69 544.76 W 870.71 676.88 W 917.69 708.94 W 964.51 740.71 W 1010.93 771.76 W 1056.66 N 49 20 W N 48 58 W N 48 39 W N 48 20 W N 48 2 W N 47 46 W N 47 31 W N 4? 18 W N 47 6 W N 46 55 W 71 N 802.50 W 1102.32 65 N 832.95 W 1147.76 50 N 863.10 W 1192.93 91 N 894.29 W 1238.57 60 N 930.39 W 1286.56 54 N 968.54 W 1.335.53 88 N 1006.26 W 1383.78 64 N 1043.06 W 1430.97 63 N 1078.67 W 1476.78 64. N 1113.21 W 1521.14 N 45 43 W N 46 31 W N 45 20 W N 45 13 W N 46 18 W N 45 29 W N 46 39 W N 45 47 W N 46 55 W N 47 2 W 77 N 1146.88 W 1564.27 97 N 1179.56 W 1606.05 31 N 1211.10 W 1646.42 04 N 1241.82 W 1685.77 91 N 1271.41 W 1723.71 94 N 1300.11 W 1760.43 85 N 1328.35 W 1796.74 03 N 1356.36 W 1833.05 25 N 1383.71 W 1868.91 51 N 1410.90 W 1~05.41 N 47 9 W N 47 15 W N 47 21 W N 47 26 W N 47 31 W N 47 36 W N 47 40 W N 47 43 W N 47 45 W N 47 46 W COMPUT&TIDN DATE: Z1-M~R-86 P4GE 3 STANDARD ALASK~ PRODUCTION CO DATE OF SURVEY: 15-M~R-86 D-27 PRUDHDE BAY NORTH SLOPE,ALASKA KELLY BUSHING ELEVATION: ENGINEER: LESNIE 71.91 FT INTERPOLATED VALUES FOR EVEN 100 FEET OF MEASURED DEPTH TRUE SUB-SEA COURSE MEASURED VERTICAL VERTICAL DEVIATION AZIMUTH DEPTH DEPTH DEPTH DEG MIN DEG MIN VERTICAL DOGLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUTH FEET DEG/IO0 FEET FEET FEET DEG MIN 8000.00 7565.61 7493.70 22 68 8100.00 7657.41 7585.50 23 52 8200.00 7748.70 7676.79 24 3 8,=~0.00 7840.15 7768.24 23 35  3.00 7932.08 7860.17 22 67 '~0.00 8024.4.9 7952.58 22 13 8500.00 8117.21 8045.30 21 48 8700,00 8210.22 8138.31 21 0 8800,00 8303.56 8231.75 20 41 8900.00 8397.34 8325.43 20 20 N 4.4 15 W 1943.23 N 42 30 W 1982.79 N 41 22 W 2023.44 N 40 49 W 2053.64 N 40 22 W 2102.76 N 39 50 W 2140.66 N 38 30 W 2177.76 N 37 32 W 2213.98 N 35 56 W 2249.03 N 35 35 W 2283.31 1 1.08 0.60 0.85 0.80 0.52 0.39 1.15 1.17 O. 1307.18 N 1437.94 W 1943.29 N 47 43 W 1336.04 N 1465.12 W 1982.83 N 47 38 W 1366.47 N 1492.36 W 2023.46 N 47 31 W 1396.93 N 1518.95 W 2063.64 N 47 23 W 1426.84 N 1544.58 W 2102.76 N 47 16 W 1455.04 N 1569.20 W 2140.66 N 47 8 W 1485.05 N 1592.91 W 2177.78 N 47 0 W 1513.92 N 1615.57 W 2214.04 N 46 51 W 1542.46 N 1636.90 W 2249.14 N 45 42 W 1570.84 N 1657.36 W 2283.50 N 46 32 W 9000.00 8491.34 8419.43 19 40 9100.00 3585.37 8513.46 20 5 9200.00 8679.20 8607.29 20 39 9300.00 8772.24 8700.33 22 21 9~00.00 8864.18 8792.27 23 59 9500.00 8955.00 8883.09 25 25 9600.00 9044.90 8972.99 26 19 9700.00 9134.52 9062.61 26 19 9784.00 9209,81 9137.90 26 19 N 33 36 W 2316.68 N 30 21 W 23~9.39 N 31 37 W 2382.53 N 32 35 W 2417.92 N 33 23 W 2455.99 N 34 18 W 2496.70 N 34 50 W 2539.45 N 34 50 W 2582.76 N 34 50 W 2619.15 2.01 0.29 1.73 1.71 1.63 1.12 0.00 0.00 0.00 1598.79 N 1676.96 W 2316-97 N 46 22 W 16,27.84 N 1694.57 W 2349.85 N 46 9 W 1557.51 N 1712.39 W 2383.19 N 4.5 55 W 1588.53 N 1731.90 W 241::1.81 N 45 43 W 1721.57 N 1753.22 W 24.57.15 N 45 31 W 1756.31 N 1776.55 W 24.98.15 N 45 19 W 1792.32 N 1801.48 W 2541.22 N 45 8 W 1828.73 N 1826.82 W 2586.87 N 44 58 W 1859.31 N 1848,11 W 2621.55 N 44 49 W COMPUTATION DATE= 21-M&R-86 PAGE 4 STaND&RD ~L~SK& PRODUCTION CO DATE OF SURVEY: 15-M~R-86 D-2T PRUDHOE B~Y NORTH SLDPE,AL~SK~ KELLY BUSHING ELEVSTION: ENGINEER: LESNIE 71.91 FT INTERPOLATED VALUES FOR EVEN 1000 FEET OF MEASURED DEPT TRUE SUB-SE~ COURSE EASURED VERTICAL VERTICAL DEVI~TI]N AZIMUTH DEPTH DEPTH DEPTH OEG MIN DEG MIN VERTICAL DOGLEG RECT&NGUL~R COORDINATES H2RIZ. DEPARTURE SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUTH FEET OEG/IO0 FEET FEET FEET OEG MIN 0.00 0.00 -71.91 0 0 N 0 0 E IODO.O0 999.99 928.08 0 27 S 89 38 E ZO00.O0 1999.96 1928.05 0 17 S 18 10 E 30r'~o0 2999.52 2927.61 4 1T N 62 11 W , (0 O0 3976.77 3904.86 21 32 N 49 35 W ,OOv. O0 ,870.54 ,798.73 27 50 N ,, 8 W $000.00 5754.59 5682.7~ 27 9 N 42 2 W ?000.00 6640.71 6568.80 25 12 N 51 14 W )000.00 7565.61 7493.70 22 ,8 N ,4 15 W ,000.00 8491.34 8419.43 19 40 N 33 36 W 0.00 0.00 0.00 N 0.00 E 0.00 N 0 O E -2.10 0.08 3.38 S 0.27 W 3.40 S 4 36 W -9.27 0.26 7.04 S 6.12 E 9.33 S 41 1 E -1.99 1.23 5.40 S 2.27 W 5.~6 S 22 48 W 188.68 2.48 108.21 N 156.89 W 190.59 N 55 24 W 536.16 0.34 414.70 N 482.96 W 536.57 ~ 49 20 W 1102.27 0.53 755.71 N 802.50 W 1102.32 N 46 43 W 1564.26 0.83 1063.77 N 1146.88 W 1564.27 N 47 9 W 1943.23 1.48 1307.18 N 1437.94 W 1943.29 N 47 43 W 2316.68 2.01 159~.79 N 1676.96 W 2316.97 N 46 22 ~' 3784.00 9209.81 9137.90 26 19 N 34 50 W 2619.15 0.00 1859.31 N 1848.11 W 2521.55 N 44 49 W STANDARD ALASK~ PRODUCTION CO D-27 PRUDHOE BAY NORTH SLOPEgALASKA COMPUTATION DATE: 21-M&R-86 PAGE D~TE OF SURVEY: 15-MAR-86 KELLY BUSHING ELEVATION: ENGINEER: LESNIE INTERPOLATED VALUES FOR EVEN 100 FEET OF SUB-SEA DEPTH TRUE SUB-SEA COURSE MEASURED VERTICAL VERTICAL DEVI&TION AZIMUTH DEPTH DEPTH DEPTH DEG MIN DEG MIN 0,00 0,00 -71.91 0 0 N 0 0 E 71,91 71,91 0,00 0 15 S 24 54 W 171.91 17i.91 100.00 0 13 S 30 43 W '1.,91 271.91 200.00 0 12 S 34 28 W , .91 371.91 300.00 0 16 S 26 23 W ~,Z.91 471.91 400.00 0 15 S 29 12 W 571,92 571.91 500,00 0 15 S 11 34 W 671,92 671,91 600.00 0 15 S 0 20 W 771.92 771.91 TO0.O0 0 13 S 15 56 E 871.92 871.91 800.00 0 10 S 41 43 E 971.92 971.91 900,00 1071.92 1071.91 1000.00 1171.93 1171.91 1100.00 1271,94 1271,91 1200,00 1371.94 1371.91 1300.00 1471.94 1471.91 1400.00 1571.95 1571.91 1500.00 1`571.95 1671.91 1600.00 1771.95 1771.91 1700,00 1871.95 1871.91 1800.00 0 23 0 36 0 38 0 41 0 3O 0 28 0 27 0 23 0 16 0 13 1971.95 1971.91 1900.00 2071.96 2071.91 ZOOO.O0 oo.oo oo.oo z, z.oo z,oo.oo 2872.11 2871,91 2800.00 0 15 0 27 0 35 0 4O 0 41 0 41 0 27 0 16 1 31 3 19 2972.32 2971.91 2900.00 4 4 3072.63 3071.91 3000.00 4 49 3173.04 3171.91 3100.00 5 37 3273.64 3271.91 3200.00 6 48 3374.51 3371.91 3300.00 8 6 3475.72 3471.91 3400.00 9 38 3577,43 3571.91 3500.00 11 37 3679,93 3671.91 3600.00 13 43 3783.43 3771.91 3700.00 16 11 3888,28 3871,90 3799.99 18 51 S 85 3,5 E S 88 26 E S 90 35 E S 7~+ 17 E S 53 16 E S 54 7 E S 43 9 E S 47 22 E S 26 3 E S 28 4 E S 21 59 E S 14 15 m slTz$ S 27 1 E S 32 57 E S 29 49 E S 35 36 E S 19 34 E N 52 5 W N 54 4 W N 60 52 W N 64 58 W N 62 27 W N 59 15 W N 56 22 W N 54 5 W N 52 43 W N 52 20 W N 51 28 W N 50 28 W 71.91 FT VERTICAL DOGLEG RECTANGULAR COORDINATES HDRIZ. DEPARTURE SECTION SEVERITY NORTH/SOUTH EaST/WEST DIST. AZIMUTH FEET OEG/iO0 FEET FEET FEET DEG MIN 0,00 0,00 0.00 N 0,00 E -0,06 0,07 0.21 S 0,12 W -0,17 0,08 0.60 S 0.31 W -0.24 0,05 0.91 S 0,51 W -0,34 0,08 1.26 S 0.70 W -0,43 0,12 1,67 S 0.95 W -0,59 0,14 2.08 S 1.12 W -0.88 0.11 2,53 S 1,15 W -1,18 0,15 2,93 S 1.10 W -1,52 0,25 3,29 S 0,97 W -1.93 0.65 3.38 S 0.50 W -2.57 0.37 3.36 S 0.40 E -3.46 0.13 3.47 S 1.51 E -4.43 0.30 3.68 S 2.63 E -5.40 0.40 4.15 S 3.52 E -6,23 0.16 4.66 S 4.17 E -7.09 0.30 5.24 S 4.81 E -7.84 0,20 5.73 S 5.38 E -8.41 0.43 6.17 S 5.75 E -8.77 0.18 6.54 S 5.90 E -9,16 0.35 6.91 S 6.08 E -9.67 0.58 7.47 S 6.26 E -10.47 0.52 8.34 S 6.55 E -11,54 0.33 9.37 S 7.06 E -12.65 0.23 10.39 S 7.63 E -13.80 0.07 11.43 S 8.23 E -14,66 0.05 12,21 S 8,68 E -15.34 0.14 12.82 S 9.04 E -14,90 2.77 12.55 S 8.61 E -10.17 0,46 9.73 S 4.85 E -3.95 0.86 6.36 S 0.50 W 3.65 0.13 2.84 S 7.59 W 12.35 1.03 1.16 N 15.74 W 23.05 1.09 6.56 N 25.32 W 35.96 1.47 13.58 N 36.42 W 51.39 1.25 22,48 N 49.19 W 69.82 2.72 33.52 N 64.07 W 92.21 2.35 118.78 2.61 150.20 2.56 0.00 N 0 0 E 0.24 S 28 57 W 0.57 S 27 44 W 1.04 S 29 29 W 1.45 S 28 56 W 1.92 S 29 43 W 2.36 S 28 15 W 2.78 S 24 21 W 3.13 S 20 34 W 3.43 S 15 21 W 3.42 S 8 19 W 3.39 S 6 43 E 3.78 S 23 29 E 4.52 S 35 32 E 5.44 S 40 16 E 6.25 S 41 52 E 7,12 S 42 33 E 7.86 S 43 9 E 8.43 S 42 58 E 8,81 S 42 2 E 9.20 S 41 21 E 9.74 S 39 58 E 10,61 S 35 8 E 11,73 S 37 0 E 12,89 S 36 18 E 14,08 S 35 44 E 14.98 S 35 23 E 15.68 S 35 12 E 15.30 S 3~ 13 E 10,87 S 26 29 E 6.38 S 4 28 W 8,11 S 69 27 W 15,79 N 85 47 W 26,16 N 75 27 W 38.86 N 69 33 W 54.09 N 65 26 W 72,31 N 62 22 W 47.20 N 81.93 W 94.55 N 60 3 W 63.63 N 102.93 W 121.01 N 58 16 W 83.47 N 127.37 W 152.28 N 56 45 W COMPUTATION DATE: 21-MAR-86 P&GE 5 STANDARD ALASKA PRODUCTION CO D-27 PRUDHOE BAY NORTH SLOPE,ALASKA INTERPOLATED VALUES FOR EVEN 100 FEET DF TRUE SUB-SEA MEASURED VERTICAL VERTICAL DEPTH DEPTH DEPTH COORSE VERTICAL DOGLEG DEVIATION AZIMUTH SECTION SEVERITY 2EG MIN DEG MIN FEET DEG/IO0 3994.78 3971.91 3900.00 4103.37 4071.91 4000.00 4214.27 4171.91 4100,00 4~5.90 4271.91 4200.00 ~ ?.88 ¢371.91 4300.00 4~0.24 4471.91 4400.00 4662.80 4571.91 4500.00 4775.54 4671.91 4600.00 4888.50 4771.91 4700.00 5001.44 4871.91 4800.00 21 24 N 49 37 W 185.76 2.48 24 32 N 48 24 W 229.04 2.95 26 7 N 47 44 W 276.97 0.53 26 33 N 47 42 W 326.57 0.28 26 58 N 47 28 W 376.97 0.42 27 13 N 46 59 W 428.20 0.32 27 24 N 46 31 W 479,$7 0.52 27 34 N 45 15 W 531.92 0.55 27 42 N 44 41 W 584.41 0.70 27 50 N 44 8 W 636.83 0.34 5114.67 4971.91 4900.00 5228.03 5071.91 5000.00 5341.22 5171.91 5100.00 5454.55 5271.91 5200.00 5568.01 5371.91 5300.00 5681.30 5471.91 5400.00 5794.33 5571.91 5500.00 5906.87 5671.91 5600.00 6019.34 5771.91 5700.00 6131.68 5871.91 5800.00 28 3 N 43 55 W 689.85 27 54 N 43 36 W 743.14 28 2 N 43 5 W 796.05 28 10 N 43 1 W 849.25 28 4 N 42 59 W 902.68 27 56 N 43 5 W 955.78 27 32 N 42 56 W 1008.32 27 15 N 42 18 W 1059.78 27 7 N 41 57 W 1111.05 26 57 N 41 39 W 1t62.00 6243.85 5971.91 5900.00 6357.02 6071.91 6000.00 6471.77 6171.91 5100.00 65~q.15 6271.91 6200.00 6~ .73:6371.91 5300.00 ".~.23 6471-91 6400.00 6923.75 6571.91 6500.00 7034.44 6671'91 6600.00 7144.25 6771.91 6700.00 7253.32 68'71.91 6800.00 27 4 N 28 52 N 29 21 N 28 45 N 27 50 N 26 42 N 25 50 N 24 53 N 23 55 N 23 13 N '42 35 W 1212.58 49 23 W 1265.48 51 0 W 1321.66 51 10 W 1377.06 50 54 W 1430.79 50 56 W 1482.24 51 5 W 1531.48 51 17 W 1578.82 51 15 W 1624.09 51 8 W 1667.54 7361.77 6971,91 6900.00 7469.47 7071.91 7000.00 7576.85 7171.91 7100.00 7684.20 7271.91 7200.00 7791.34 7371.91 7300.00 7898.73 7471.91 7400.00 8006.83 7571.91 7500.00 8115.86 767'1.91 7600.00 8225.41 7771.91 7700.00 8334.62 7871.91 7800.00 22 13 N 21 29 N 21 17 N 21 15 N 21 5 N 21 47 N 22 53 N 23 59 N 23 57 N 23 18 N 51 5 W 1709.40 51 15 W 1749.28 50 49 W 1788.32 50 10 W 1827.29 a9 16 W 1865.72 46 55 W 1904.87 44 5 ~ 1945.88 42 15 W 1989.22 41 11 W 2033.72 40 41 W 2077.33 0.52 0.61 0.14 0.30 0.43 0.30 0.74 0.28 0.32 0.53 1.4~ 2.89 1.37 0.62 0.64 0.77 0.75 0.99 1.06 0.81 1.18 0.59 0.29 0.56 0.58 1.27 1.49 0.93 0.47 0.88 DATE OF SURVEY: 15-M~R-86 KELLY BUSHING ELEVATION: ENGINEER: LESNIE 71.91 FT SUB-SEA DEPTH RECTANGULAR COORDINATES H3RIZ. NO~TH/SOUTH EAST/WEST DIST. FEET FEET FEET DEPARTURE AZIMUTH DEG MIN 106.97 N 155.43 W 188.68 134.69 N 187.38 W 230.77 166.82 N 222.95 W 27~.45 200.19 N 259.6~ .W 327.86 234.19 N 296.86 W 378.11 268.97 N 334.47 W 429.20 304.31 N 372.16 W 480.74 340.53 N 409.56 W 532.64 377.68 N 446.72 W 584.97 415.18 N 483.43 W 637.24 N 55 27 W N $,, 17 W N 53 11 W N 52 22 W N 51 43 W N 51 11 H N 50 43 W N 50 15 W N 49 47 W N 49 20 W 453.43 N 520.28 W 690.14 491.90 N 557.29 W 743.33 530.48 N 593.68 W 796.16 569.46 N 630.10 W 849.30 508.67 N 666.62 W 902.70 547.59 N 702.95 W 355.78 686.07 N 738.93 W 1008.32 724.08 N 773.88 W 1059.80 762.26 N 808.40 W 1111.11 800.40 N 842.54 W 1162.12 838.25 N 876.44 W 1212.77 875.23 N 914.29 W 1265.69 910.90 N 957.82 W 1321.80 945.71 N 1001.08 W 1377.14 979.57 N 1042.96 W 1430.84 1012.10 N 1082.95 W 1482.27 1043.15 N 1121.29 W 1531.49 1072.89 N 1158,26 W 157~.82 1101.30 N 1193,65 W 1624.09 1128.59 N 1227.59 W 1667.54 1154.92 N 1260.26 W 1709,42 1179.97 N 1291.41 W 1749.30 1204.54 N 1321.85 W 1788.35 1229.36 N 1351.98 W 1827.34 1254.21 N 1381.35 W 1865.79 1280.29 N 1410.56 W 1904.94 1309.08 N 1439.79 W 1945.94 1340,81 N 1469.47 W 1989.25 1374.24 N 1499.18 W 2033.73 1407.38 N 1527.93 W 2077.33 COMPUTATION DATE: 21-MAR-85 PaGE 7 STANOARD ALASKA PRODUCTION CO DATE DF SURVEY: 15-MAR-85 D-27 PRUDHOE BAY NORTH SLOPE~ALASKA KELLY BUSHING ELEVATION: ENGINEER: LESNIE 71.91 FT INTERPOLATED VALJES FOR EVEN 100 FEET OF SUB-SEa DEPTH TRUE SUB-SEA COURSE ~EASUREO VERTICAL VERTICAL DEVIATION AZIMUTH DEPTH DEPTH DEPTH DEG MIN DEG MIN VERTICAL DOGLEG RECTANGULAR COORDINATES H2RIZ. DEPARTURE SECTION SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUTH FEET DEG/IO0 FEET FEET FE~T DEG MIN 8,43.15 7971.91 7900.00 22 28 8551.18 8071.91 8000.00 22 1 8658.8, 8171.91 8100.00 21 34 8~,'~.03 8271.91 8200.00 21 0 · 85 8371.91 8300.00 20 20 89,~.37 8471.91 8400.00 19 41 9085.66 8571.91 8503.00 20 3 9192.22 8671.91 8600.00 20 32 9299.64 8771.91 870D.00 22 20 9408.47 8871.91 8800.00 24 7 N 40 10 W 2119.23 N 39 15 W 2159.77 N 38 % W 2199.17 N 36 25 W 2237.19 N 35 41 W 2274.05 N 34 34 W 2309.93 N 30 25 W 2344.68 N 31 30 W 2379.91 N 32 35 W 2417.78 N 33 28 W 2459.36 0.72 0.76 0.71 1.93 1.07 1.24 0.47 1.56 1.71 1.57 1439.49 N 1555.31 W 2119.23 N 47 12 W 1470.89 N 1581.49 W 2159.78 N 47 4 W 1502.07 ~ 1606.34 W 2199.22 N 45 55 W 1532.70 N 1629.80 W 2237.28 N 46 45 W 1563.16 N 1651.$5 W 2274.22 N ~6 34 W 1593.06 N 1673.08 W 2310.20 N 45 24 W 1523.59 N 1592.18 W 2345.11 N 45 11 W 1655.18 N 1710.97 W 2380.55 N 45 56 W 1588.41 g 1731.83 W 2418.67 N 45 43 W 1724.&6 N 1755.14 W 2460.54 N 45 30 W 9518.75 8971.91 8900.00 25 38 9630.14 9071.91 9000.00 26 19 9741.72 9171.91 9100.00 26 19 9784.00 9209.81 9137.90 26 19 N 34 27 W 2504.58 N 34 50 W 2552.51 N 34 50 W 2600.83 N 34 50 W 2619.15 1.12 0.00 0.00 0.00 1762.97 N 1781.12 W 2506.08 N 45 17 ~1 1903.30 N 1809.12 W 2554.37 N 45 5 W 1843.91 N 1837.39 W 2603.08 N 44 53 W 1859.31 N 1848.11 W 2621.55 N 4~ 4'9 ~ SCHLUMBEROER O I RECT I ONAL SURVEY COMPANY STANDARD ALASKA PRODUCT!ON WELL 0-27 FIELD PRUOHOE BAY COUNTRY USA RUN ONE DATE LOOOEO REFERENCE 00007]~87 WELL D-27 (1606'SNL, 1692'WEL, '~--'~, TllN, R13E) VERTICAL PROJECTION -500! 0 0, .c;o0 1000 l.~no /uuu zboo 3on ~"'~ ~ T"~--',--".."-'-..-.., ...... ~-...'.--..,..-.,i---,.+.,., .... ~ ,.,...!...-:+~..,.....,-.,.-.~...-~.~_~_~... ~_~...:...,..., ~ ~ · ..?..?.? ...... ,...,....?..., ....... ? ....... , ..... ................ ....... '"?"?T'?t't't"~ ....... ~'W'+"?","+--?~--~--.+..;.-+-+.-.---¢--+-~.-~.- ~---;&;- : ~-.~... ~...;..i..fii?'""'?'~"?"?'~" '"??"?"~ ...... t?"t"~'"~-~'"~'"~--~ ....... ?-~'"~--, ...... '"~"?"??~-'5'"~'"*"'~"'"';--~''-~ ~ ~ ¢ g ~ ~ : ~ * : : ~ ~ .[...2 ~ : : ~ ~ ~ ~ ? ~ ...... ? ....... * ....... *"'* ....... *'"*'"*'"* .................. *.-.~...;.-L-.~.-,..,..~...:...,_.~...x_.' ~ ¢ ~ ~ ~ ~ 7'TTT'T'T"?" "'7'"r"y"TT'~'"r"?'~ ....... f-t-f..f-f.+.-~ ...... ¢...--.~..-~--..~...*.4.-.:...*...~...; ........ ~...:...;...: i; ~ ~; ;; ~ 1 ~...,...~...:...~_.~...~_: L...u ~ ;.;; ~ : ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ i ~ ~ ~ ~ ~ ~ ~ ~ '~'"'/"~ ...... ~ ~ ~ H...~.++.H ...... :::::::::::::::::::::::::::::::::: ::::::::::::::::::::::::::::::::::::::: :::::::::::::::::::::::::::::::::::::::: ::::::::::::::::::::::::::::::::: :::: : :: t: ~ } l ~ ) H"', -"H'..H...H...H-.~ ....... ~ ~ ~ 7'T-r'T'T":'"r-"'~'"*'":'"m'",'"t"t'+" ~.+.+.+.+..t..~..+.+.4.-.-¢.¢-~-.*.T.~.4...~4.....4-L.;4...L4.~ ~ ~ } ~ ~ ~ I ~ ~ ~"'~'" "T'T'T'T"*"T'T"r": ....... r':'":'"r"r"r"t"f.~ q-TTT'I'T'??t~' "~["t-'t"~'"'~....ff...f.ff+...~..+..¢..+.+....-H...HT;...~.4...;.....4..-~...~.4.~.. ~ ~.. ~..~.i if::Y:i:i :~::!:i ~ ~ ~ ~ i: i::IT'";'"t'~" -*?"t'~ ...... I ..... F"F'-F'?" '"?"5'-'-?--'? ...... +---5.--5-.-*.--*..--~---a---~..,~ ...... .i. ~ L,:-.L.:...Z..: ~ i i ~ i / 5 i i ! ~ T ~ ~ T ~"~'"~"'~'" "~-'?"'~'"~"~'"*'"?"*"'?" '"*'"?"+'"*'"~"*+'"+"'+'"+"""'4'"'~'"~'"*"'4"'~'"~"';-'-;,- · -.,*..,*---;---J-.-~.--~,..i...i ..... ; i 0.-~.-.i,..-~---~ i ! ~ t ~ ~ i ~ ~ ~ '"'T"'~"'T'"~'"~'"~'"T'"T'"T ...... T"'T"'??'~'"%'+"'+"'f'"r'"'k";----~.-;.-;-..~--.;-..~..-~.-....i...i...i...~..,l.,..}...~,,.~...~ .... ~, i i ~ 4--.4---4,..1...4.4...;-4,..L .4,~:=.L{ ~ ~ ~ T 7-'F"T"T'-4"TT'T-T"~""~'"~---t-t-'~---~...?t-f ...... f'f'+'"+---r-%.---?-4.--4..-:-.~.--4..-4..-.F.{.--4.--4--,4...4....4.4....L.;...~.4,4.4.4 ...... i...;.55~ ! ~ ...~ i~ ~.4...~..~7~L ~_i~]~[~I~7~7['"T"';'"T"T'T'TT'~-t'"~'"'t ........ f..-f.f-.f-.4-..?+---+.---} ....... {-4-.-4 ....... F.4.-.4.-.4.--.~ ...... ~...L..LLL.L..L..~.i' L.L.!...L.L.L :i~ -..F..~....L.L.!.-~.4.4.4 ~'~..L..L4....L.~..~t~]"' 'TT-T-T'"F"T"'T"T"T ........ f"ff'"f"f'-f"f"f"ff"-5 ...... f-'--k-4.---P.{.-4-.4.-4..-4.----L.L.L..L.L.L.L..L.i......L.i. ~ z ~ T'T"T'"T ....... T'"?'"T'"T'TT"T-T'"T ...~.-.L.L.i.i ~ ~i~ii7 531!3~iZi'.i?"Pt'?Y"'t'"~-'~ ........ t"'t't"t't?'f'"f'~ ....... H--.+---~...f.+.-5...4--..k-4.--4--.k4.-4-..F.4...4....~...L 4. ~ i .LL.L.LLL.....i..L.~...L4... t.--4--4--4-..~-4-~.--.~.-.4....~ ...... g.~...L,~~,..~[~ iii3 ~ ii~i?511?'T'?"??"T'"?"'?'"'t ....... t'"t'"t"~'--t-t..~-..~-..~.-.' ........ H-"H"+..4-.-~-..~ ...... 4--4 ....... ~...4....~...4,..L.i ....... i.4,..~...~.,.~...~...~...~...~...: .... F'T"TT'T""~-'T'"r"T ....... f"'f'f"+"t"'f"ff'"+-+ ........ F--~...~--.~.-+..i .~....~..+....4---~.--~---~.-.;-..~...L.;.4 ....... L..~..-L.L.L.~...L.~...~ ....... ~...~ i ~ ~i i ~i~ i .... r'?'"?'"'r-mf-.f-f-+ ....... ~.-+-+.+-+--+.-+--.~--.~ ....... ~..--k..k.~~ ....~....~.4...~ { L..L..L.i ....... ~ , ~ ~ ~ ~ ~ ; ~ ~ i T'"r"F'"::-r"~ ........ r"r"r":'..{-..~.-.?-.?.?-.-..,---,.-+.+..~-?~.-.+.--~ .... ;...~...~_.4...4...4...~...~ : : ..Z...; : : : ; : : : ~ 5 ~ i ~ ~ ~ ~ : : : i : T T'"~'"~'"?","-?..?..~---~......~...?..?..?...h..,...~...4...a.......4,......~...~...~.. : : ~ ..... :...: : ~ :"H'"'f"~'"f'"f"-H'"~---'"~nh~:::~:::~:::~:;:~:::~:::::::::::::::::::::::::::::::::::::::: ~~J:;;~:;:F ::::::::::::::::::::::::::::::::::::::: :::~:;:~:;:~;::~;: : ~ ~ ~ + "'H...H...~...~...~...~...~ ...... :::::::::::::::::::::::::::::::::::: i ! ~ ~ ~ i ~ ~ ~ ~ ~ ~ i ~ ! ~ ; g ~ L~ ~ ! ! 5-W~,~ i~m~n~i~T "'T'"T"T'T"'"T'"T'"?'T ...... r"T'"~'"~"T"~'"~'"t"f .... ["'?'-T'"T'"~"T'"F-F'T ........ ?..~...~-.~...~...+....}.~+...5~.t....}..~.?-}~.{...;...~...i.~4...~......;..4....~...~..~"~.~...~...i...~..~.~ ~O~.L~L~ ~ ~ i i I ~ ~ } ~ { { ~ i J .... r'"~'"T-'~'":"?'"t'--~---~ ....... ~---+.--~---4-4----F..4....~....~.......;....~...~...~...L.L.L..:, .... L.L..L.!..!_i...:.~ ~ i i ~ ~ ~ T-T"T-?"'-?T-T'"T'"7"T"'~'"'r ........... ~-'t"ff-'t"t-'+"'+"'~'--~ ....... +...+...~...~-+..~.4...;-.;... ---+.-+.--5-.%.~ i : : ~-..+-.,..4...~: i ....... i..4...~...~-.J....L.~: : ~, i _.~...~..:~...L~ ..... J T'T"T-?"-??"?"?*"-??,---?-? i i ~ i ~ ~ ~~l [ ~'?" ~ ..... ~'"~..,...~ ............... Y"T'"T"T-'q"'?""?'"?'?~-'~'-~--'%'5'-'--'5.-+---5.-+.-.._o.,...4...; ~ ~ ~ ~ ~ ....... ~...~..4..4.4 ....... ~....-..L.~ ....... ...... J ~...[ ..... ....... ,...,...,...,..., ................ ....... .... ! i ~, J , !! J ~ ~ i ?fi ~i i i ~T~T"T'"T'"T'"T'" "'T"T"T"TT'T'"t"t'"t ...... t"f'f'"t'"t'"f'f'f"f ....... f..f...f..4-.+-+..+...4...4... .... ~ ~ ~ ~-f'ff'~t-t ....... +-+-+-H--~..-~---~--¥--+-~-.;-.;.-~-.~-.L.L.~-._L~. ,.,._,...,...,...,...',. L i : ~ !~.j ' } ~ E { ~ ~ ~ ~ ~ i ~ / ? g { ~ ~ : ~...~,...~-.~...~-.,.. : ..~...~. Z : , ..... ~ ; i ~ i i : T ~ T T T T" F"T"'T'"T'"*"'T-'~-T"*'" '-?-?"?'~'"~---~---+-5--+ ....... ~-..*.,.~...*...~ 4 ~ * ~ ..... i..4-.~...~ ~ i .4..L..~_L.L..L~.L..=~ ...... i...!. 7T'T"T"'T"T'"-T'T"?"T'"'?T'-T'"T"T" ~..T...f.~..f....f..+..f.f...f~ff...~...f+..+~+..~...~.~...i...:...~...~...~ ....... ~.4...L.L.,.-L.L.L.~ ...... -...~ ~ ~ --.~..-4.--.k4-4...~.ml..i ~Z~551 5~ i i ~i~iiS'i"T""r'"?'?'r'i""t'"t"t't"{"-t---t'"t'~ ....... ~--+-+-+-.H.4.--~ -q~44...;-F.4....~.......;-..i...;...;...}....~...~ ~ ~. ;..i.i.i..~iliiS! i ~ i r+l ! ~lJlJllj '-T'"'~"-~'"T'"'~'"T"r ..... ?'-F'?-'e'"?'-?'"?+ ....... 5'"5"-5'--5---f..+---+..*--.*-...~.~..4...~...~-~ ~ ~ j i i ~ ~ T i i i ~ i ! i ~ i ~ T ~ ~"?"T'~*'"* ....... ~'"?'"*'"e'"*'"'~'"?"a"'4'""--*--.4----P..~.-..~.---~---4---.p.-.p.- ,.-~...i...i...4...4...:. : : : : i ! i ' ! ~ i ~ : i , ~ i ~ ~ i ~ : ~ ': ~ , ~ ~ ' ~ ~ ~ ~ ~ l-'-f--ff-ff-f'-f--f~+'-F' '-+'-4----H--.F-.H--+.+-. ~--.;4...4...4....~..-4...4....~...~5:5 2:i:isiTisiZsi:55 555i i ~: :~ Z55~ ?t--"-'~?"ff-H'"~:,-.-H.,-H...?~...H... ...H...H-..H-..F.F.4..- }~ ~ ~oi ~ ~ ~ i~ ~ 'T"T'""'T"T-?TT"TT~[~i'T"T"~ T'","?"t"t'~ ....... .... 4--4.--4..4.--~4-~L..', ....... L4...L.i L.~...~...~...~......i..~...[...("T'T'T"T"T ....... T"T"T'T'T"T"T'Tff'" "ff'"t-ff'"~'"4'"f'fff'-ff-.-.--.4-..4.-4.-4-.-l-.4--.4-..4---~ ........ F.L.4.4...~ ....... L.i.4 ...... L4.4..i } L.T...T...T... .... ;-.;-..~..4--4--~.~i ii ~ ~ ~ ~ ~ ~ ~ i ~ i T T "?T"T'"?T'"'"'T"'?-?'?'T"T--'F'T-+ ...... +-..+-.~.--+-----.~-..+.-.+...+......4..4...;...; ...... ;.-~...;...~ ....... ~-.L4...L.I..~ ~ ~ ~ ~ ? ~ ~ 4 ~ i i i ~ ~i ~ q~T.T.T...T.....TT.~T-T...~...~-~....~.T...~...t..t..?.~...v..+..+~".{...;-4~.4.~{~.4..4...4 4 ~..;.......~..L.L.L.I.i ~ i ~ ...i ............ i..LT '~"T ...... T'"T'"T'"T'"/'TT'T'"T ..~...L.i...~ ~ ~ ~ ~ ~ ~ ~ ~ ~ [ i i i ~ i ~ ~ i ~ ; i I T: T T T T I'T'T'-T'"T ....... T"T"T'"T-'T'T'T'"T'"T ~ i ~ ~ ?~ ? ...... T...T.~T~.T...~...T....F.?.r."".???.~"~r~.~.~..~F..*..~r~.~...~.~.~.~*...~..~ ~ ~ ..... L.~...~..4...~..~ .i ~ ~ ~ ~ ~ ~ ' ~ ~ ~ i ; ~ ! ~ ~ I ~ ~ ~ ~ ~ , "'r-'r"~--'r"{--?-:?:f--f ....... ?-f+--+-.-4--+--+-4.-.-}-....~-.--}....}...;.4...~...~.-.~...L, :...i...i i 4...4.4...L.L.i.. i ~ ~ ~ i'T'"F'T'"~ ...... T"T'T'T'J"?"'?':'"T'" '"?'f"'t'ff'"t'"?'+'"~'"* ....... +..-+..-+,.4...f,-+...¥.~.-.+ · "t"~'-'t'-~--t---?-~+-..+ ....... +..,+--.4..-4-..4.--4-,4...~....k..~...i,,.~...;...L.4,..L.L.L.i ....... L.L4...L.i...~ i ~ i ..... f'T'T-T'"~-'T'"'?T'"T ...... T'"T'"T'TT"'t"f'"t"f'"f ....... ?"t"t-'~-'-f"+-'{...{-.4 ...... 4.-.4...4-..}...}-.4.-.¥.i...; '"t"t't't+--+'~f'--} ....... ~-'+--+-"H--i-'-+'--}--'4'..'..-4.--.k-4.-.4--.~--.4.--44---~ ........ ~.4.4...;.4...ilf~i~!i~ it~!it]ii+it~iT'"T'"'"'?t't'?t"'t"t't't' "'t't"t'f"t"+'-+'"f"~ ...... ~'"+---+'"H'"H'" ;...i ....... i.4...i.U.i i 'TT'T'¥'i'"?'"¥'?'T'"'T"?'?'?t?'t'* ..... ~'"5"-'?'*'"?"*"+"H ....... H..-f..4-4-..4-..4...4....k.....4...4.4...i...F.i..; ;4....,4.4.4..,L1 .[ i i i ~ ! ~ ~ ~ .... ~ .... ~ ~ ...... /'"'~"T"~'"~ ....... ?"?'"T'"?"+'"?"?'~'"4'-'' ---4-..4-.-4.-.-}-.4.-4-.; 4 4 .... a..~ ' : I : : ; : : : : ~ : : : ; : : ...... 7 ? ~ ~ ...~...~...?...~...,...+_+...f..~... i~5~5~2}i~...f.~_?...+...+..._4 ....... +--.~.-.4..-.~--.4..-4-.-4.......;...;.-.;.-..~.4...!...;...;...~..; ~.)itZSi31?':'"~'''~'''?''?'T't'Y''t't''t''~ ....... t'"t"f'ff'?"+'+'-~ ........... ~.--+...H-..H.-.F.4... :'T'T'7"?"??'t','-~r~mn'~?t'H'" '"?f'?"H-'-ff-?--ff-~ ........ }-4.--F.-H.+.F-F.4.-.'...t4...~.-.~4...~..5~55iSi55 32515iZiZ:ill 25i i ~ ;itJlt5511::5??'?TT't"t'"f" .... ;.4.4...il!~_.L..L..L..~..~ ~ ~ ~ ~ ~ ~ ~ ~ i ~ i ~ i ~ ~ I ~ ; i ~ : { i i ~ i ~ ~ ~ ~ ~ ~ ~I~ ~ T~"'T"T'T'V"T'"T"T- ..... L.L4...C.J ..~ ~ ~ ~ .... ~..?T"T"?-T"T'T"T .......T"T'T'TT'T'T--~--'f-4'-'t'ff'"?t--f-'?--f--~--~ ...... ~--.~-.~..-4-4-.4...~...~-.~.......L.L.L.~...~...L.L.L..L.....L.?....L.~ ~ ~ ~ ~ ...(..~ ! ~ ~ ~ L.L..L.L.L.L.L.L.~ ......L.~[~[~T~[TT'"'~ .......T-'?'T?/"~"T-'~'"~ ......~"'~-f'"?'"~'"?'t'-f-~ ....... ~...~...f...k4..4-.~..4....~......~...~...~.L.LL.L.L..L~...L.L.~...y..L.~...~...~...~ ...... T...T~T~','"T'"T"'T'"T ---F~-.-~.--;--4.--~---kk~ ....... ~...~...~...~ ....... L.;..!~i~ ~ ~ ~ ~ ~ ~ ~"~ ....... r"¥'~"'?'t'"t'"t"t""?'~'"t"H'-+-+'+.-~ ...... H-+-H--.~-.-k~...~..-'-.-~..-~ ....... ~.4...~..-~...~.4 ....... ~ i ~ ~ I ~ ,, ~ i ~ ~ ~ ~ i ~ T r'T'" '"?"?"TT'?-.?--~ ....... r-r"r"r'T"ff"-f-'t-+--".+.-+.-.+--+..f.-~--+-.~-.-¥...-;.-.;...~..-~...~....~ ....... ~...; ....... ~.4.4..~ ~ ~ ~....f..H..H....H...H.......H...H...DH...~....~...~...F.~...~...;...[...~...LFF44...L~...~...~...~...LL...LL.L.L~...LLL~ ....... ~ f i~ ~~i~ ~'~'T'T"TTT'"?"T'"'"TT'~n~?TT'~ ....... ~'"ff'--ff--'ff-'-~--'~'--~ ....... ff ..... t.+--f-f-f-+-44..4 ....... ~---~..+-4.-.?~..-~---~ ....... ~...;...~.4.. ~ ~ ~ ~ ~ ~ .~ ~ ~ ~ ~ ~ ~ ~ ~ ~ , '"f'?'"f *'t'-f't"~ .......~-~--.4---+---4----~---4..-}...-~ ....... b.-b--4.4-,,4...L..~,..L.4 ....... L4.4. ~ i,..i...i,_i..L.....~ ~ ~ ~ [} ~i ~ '! ~i~ !}i ~ ~ ~ i~ i~ ~' ~ .... ~-'~'"t"~-~-'~'"~'-~-'~'","~-"~'"4'4-- -~.-~---~-.~-. ,..~....~...~.4-4...L ~ ~ ! ~ ~ ~ ~ T T 7 T ~ T'"T'TT'~-T-T"'T-"r ........ r"~-'~-'~'"~ ....... T'"~ ........... ~"'f'+'"'?--~....~...+.,-+.-.~ ............... +...4,..4 ........ .... r--?-r..?~..,%-~.-,+-,-+.-.--~.--*.,..k..~ ........ k..~...~ ........ i ~ a = 4 ; : : i ~ i i ! ~ ~ / i T T'"~'" '"'T'"? ....... T'"'~ ........ ~"'?"*'-,'"?'?'?'"~'"* ....... ?"~"-~ ....... ~...~.,.-k.-~,..4,..,k,.~ ~ i : i : ~ ~ T , ~ T"T"'T'"~"'T"'?'"?"'?'"~"T"T'"T"'* ....... ??'?"+"'~""'"%'+'"5'" "-5,,.5,.--k--~.-.* ........ ~,-4.--~--4 ~ ~ ~ ~ ~ ~ ~ ~ i .4 ........ ~i~ i i:l~l~i~i ~il ! { ~i iii , / ~ig~ i~il ~ .......... ~ ~ i ! · I ~ ~ ~ ~`~.~`~`..~...~..`?```?`.?`?.~..``.?~?``1.~.?.~`..~.``~.`~i`~`~.`.~``~...~```i..`~`..i``~`~`.i-~.`~``~..4..`i~.~;`.~..`i.` { : : '. ~ ! ~ ~ i ~ i / ~ i i i i :: ~ i i ~ i ~ ~ / -'T-'~'"~'"t"?'ff-'f't"~ ....... ?.-~...5~.+.-+..4-4...+.~4..~...4...4.~4...4...L.;...L.L.L.{..L.L~L~L.L.L.L.i...L. ,...i..L.L.~..i i ?T'T"i"TTTT': ........ ?T"~-T"?'''7''?'''T'''*''''~'''~'''~'''~ ....... ~"'~'-~'"?"1'"?'+'''+'''+ - · - , ~, ...... · ...... ! * · * - ~---*---...-*.-.,---~-.. --.~...,...,...,...~., - ~ , . . ~ ~ ...... / ' , : , ! I '?"-*-'.? ...... * ........ ?...?...i.-.!.,-? ........ . - ut~, · ; ; ' ; ; I ; i : i i : i i ' i i ; · ;;i;'' ;T.;.i;;ii :[iii:l:: i PROJECTION ON VERTICAL PLANE 312. - 132. SCALED IN VERTICAL DEPTHS HORIZ SCALE = I/SO0 IN/FT WELL D-27 (~1606' SNL, 1692'WEL, , TllN, R13E) n~IZONTAL PROJECTION NOI~TH 5000 ZOO0 SOO 1000 SOO -S00 SOUTH - 1000 -ZSO0 NEST REF 000071267 SCALE = 1/~500 IN/FT :'i::i:~::i::~.:::~:~:t ::::::::::::::::::::::::::::::::..?~:~::~~ ~±~::.t¼~: ::::::::::::::::::::::::::: ::::::::::::::::::::::::::::::::::::,:::i:::i:::i:::i::: ::::i:::~:::~:::~::: ::::::::::::::::::::::::::::::::::: .~.,.L-L.j... --L..-L.L..L. L~...L. Lj...L.L..~. L. ~ ..... ~-LJ..~-.~-L~ ...... L~J.-L.I~. ~ ~ ..... L. ~ -L..LJ... L..[..~...~ ....... L.. L.. L..LJ_,L. L, L.. ~ ....... L. L..~...: ...... L.. L.. L.. ~ ...... ~..,L,L.L.L.L.L,~.,.L- 'TT*'Y*?** ?*T-*T'"T*'*Y* ?T**T***T-'T*"y*T***T-T***T ..... T'~***T"*T*-y*T*'*T*'*T**'T ....... T'*'T*'*T*-?** *-T***T'**T'"T ....... T***T"*T'*'Y' *"T'**T'*'T-*T*'*' '**T'**T*"T**'T ...... T***T***T**'7-* *"*T***T'**T**'7 ....... U'*T**'T**'T ...... T"'T'"T'"T'"?"T'*T***T'"T "T"r*r*r**'-??~-~'** ~*~-~'**~"'~*-'r*~*"?*~'*'? '*"~-'~'**~'"~'"~*-~*"~*"?~" "'*r'~'"~"t" "-~"*~*-*~*"~ ....... ~***~*"~'"~'**f-~*"~'*-?**~-"~'"~"~'*'?**? '"~'"?"~"*~*** '***~'"~"*~"'~ ...... r*-~"'~--'r- -+**'H*~**H* -'~'~-~-- ~-'~H*~-*~*"~-*~*+***H* -%+*'~-*? "H+*'H*H' *'*~***H*H*~.~ '-~*-*+*-*~.-~ ....... +-+-*+-..H.~**+,..~...~...~...~ .~..,~.,.~...~... ~.*.~...~-.~...~..* -.~...+-,~,..~ ...... ~..,~...~,..~.**..-*~***+,*,~.,,~** : : : ~ T~T'T*** T T**~"~¥**~*~'-?* : ~T ~ ~***T**T'~ ..... T'**T*'T'**T*' T~*T.~Y~T~T~*~-T.~T~.~T~*~.*~T~T~**~"**T~*"T~T*~*T~.~T ...... r*'T"*T*"T~"'"T'**T'*T**~'i'*yT*'T*'*~***~ '*T'*~*~-T- -T'*'T'"?-+*' ~-Y'7-'+'"~ "t"T'"T"*T-'T ..... T'-7'"7"?- '"7"'7'-T'"7 ....... 7-Y'T*'*? T'''?+''*~ ....... T-'7'*'T-*+ '* '?+ '~+ .... ?T"*+ "+ *' ~*'7'*'T-T*''H' '-'T'"+ ''+' + ' -?"'7'"7'"T"** "*T'"T'T"~' **'7-'T*'*T'"T'- -+-*-.+--J--?-+..~..-~..--.+--+-++..~---~.--+--~.--~ ...... +-..~...~---~-.-~..-+.--~-.-+-.~ ....... ~.--~.--+--~-..~.--~.--~-..~ ....... ~...-?--+.-.~.-.b-.~...~.~ ...... ~-.-~---+...~...,-..~...~..-~--~ ....... ~--.+.-+~...I...+...~...~...~.......+...?..~..+.-~...+-+...~-.+.. -~...~...~...~ ...... ~...~...~,..~... *************************************** ...~...~...%_.~...%...~...~...~...~ ....... ~***~...~...~......~...~..~...~**..,.~.-~...~...~... _.~...~._~...~......~...~..~...~ ...... ~...~_.~...~......&.,~.,.~,..~ ...... ~...~...~...~ ....... ~...+.,,~..,~......~...~...~..,~.. ,-4-.-%-~--4...'--~--&---4-..~.-- ---%--&,-.~-.~--;.-.%,--%--.%-.-%.-- .--%-,%.-.%.--$.--L.4...%--%--A-- --~-%..~-..b.- -..~-.~.--%--& ....... %.-&.-%-..$,- -.-~--%.-.~--~ ...... ~-.&.,.~.--~---L.&.-.%-%.--%-- ..,&-..%--%-.~-.~-.~...%.-%..-& ....... 4,-.$-.&..-% ........... &..-%.-.4-. ~"'r"r"~'"r"~'-'?'%+'--'--+-+-'~--+-+"r"~"+'-'~ ...... ~'"~-'+"?-'~"'~"-~'"?--~ ...... r'r'~'"~-'-~"'~'"~'-~"+'"'"~"'~"'~'"~'"~'-~'"~-"~"-?-' ~"'~"+--+'-?~'--~'"~-?"?" '"~'"~'"?'+"f"~'"?'P'~'"'"'~'"r"r"r"~"'?"?'+"? -%-~-..~---~--~---~-.%--%---~-- ,.--~-~--b--~--~--$--.~-.~--~-----~--$--~-.-~-,-%...%---~..-~-~.-, ,--~...~.--$---&-.+-,~--~.--~-.-% ....... ~--%.-~..-~--,%-.$-.-~-%-.~ ....... H.~---i--~..,%..,&.-~-.%---.~ ....... b.-~.-,%-.~,..~--4-,~..-~-..%-.....%-,.~..%-.~-,.H,~-.~-.%..,~-· "r'?'T"rT"?'"'~'"?"'?'l' "'?"'?'T"yg~'r'? ....... r'?'"?'"?"T"?"IT"?'"? ....... ?'-?"'?'-?'"l'"?'"?'"'r"r"]'"?'?"'y"y'T"?'"?"'?"'?'" ....?..?...?...r..?...?...?...?...?.......?...T..?...?..T..r.r.~...T..]...T..?.?.?...:...F?.?...T.. :-t-"t---t...~..-:..-.~--.~...~-.+---..~...+...+..l~...,_.~:.~..~ m'"*'"~'"':"':"'~'"~'"~'": ....... ?'":'"~'":'":"':"'~'"~'": ...... :-'-~-.-~---~.-.i...,---,.-.:.--:-.---.:--.:-..,.--,.-..-.-:---:...:..-,..-....~--.:.--,--,-..t...:-..,..-t.--, ....... ?-?.:-.?.?-.: .... -r-r-T..t.-t-+-.t..+.-t.----+-+--t---t---?-t~- m~- ~.--t-..?--.?,-'?.-.r-.y-? ....... r'r-'?---?--'?"-?---?'-'?-'+-- '"?'"?"H'+"?~"+-~l't ....... ?.t--+-.t--.~..-r.-?.-+-t...~..+-+.+.+..r.??t...: ....... ?'"?'"?-'?'"t"?'"?'"?'"? .... --?'?.,--t..-t--t--t ..... t---t--'t--'t-"f-t-~----~--~'--~"'?--?'-'~-'?-?'-'?'--?-"?......~..l~---?-.-t-~.--?-.-?..-?.--t---~--?...t---t-..t.--t-:-?...t..~-..t ....... t...t...t...t...~...?.-?...t...t......t-.t...t...t...t...t...t...t...t.......?...?...?...? ....... ?...?...~---? .... .... F??"FFT'"?~'"t"'-..?..-~...t...%.-?-t~..---?~---?-..?..~-.'?.~---y.~-'-?.FH--.?-.?-.t-..?..-.-.?-.-t-..t.-.t---f..?.-.t.-.t..-t ...... t...~-..t...?-.?--?--.?...t.-.il..?---t..-t--.t..-~-..t...t.?...? ....... ~...~...?...~ ....... ?"r'y'" :~..~...~...~...~..~...~...I...~......~...~...~...~..I...I...~...~...~.....~..~...~...~...~ ...... ~--'~"-~'"i---~--'~-'-~'--~-..~ ....... ~--'~---~--'~'"t-'-~-"~-"~'"i ....... ~'-'~---~-"~'"t'"~-"~'-'~'"~'" %'~--'~ ....... ~"-~'"~'"~ ....... H-.~---~ ...... ~...~.-.~-.~.- -~*-~---~-.-H--~.-.~..-~.--~-.-..--~--~-.~--.?,-+-?.?.:.-.t..~.~-..~---~.-~ ...... ~..?..H-~..~.?.?..~?~.~..~.+.~.~.~.~..~...~.~..~.~..H~..~...~..~. ~-~-..~.-.~..-~ ....... ~.-t..~...~-.....~--.~?~......~..?--~...~... -H+*+.*H*H.H-H.~**H-..*+**H+**~*-~***-~*-*.~**-H*H.~ --*+***+**H-%* ,~~-~***~***~ ...... *********************-**********} ....... *************-********************* **.H.H*H*H,f*,%-H.H*H* *.H.H+**~ ....... H.~-..H.~.*, ,***H.~..*+*.+.**~**,?+*-*H*~ .... .-~...~...~..z ..... ~...~...~...L... ************************************ ...... ~...~...~...~..,~,..' ..~...~.~-- ~ ~...~...~ .. ,..L~...~ ..~ ....~...~ ~ .; ~. Z.. Z ~ ~ ~...L...L.L..~ ~...~...~ .~ ~ ~.~**.;**.~ .~ ...~...~-~***~ ....... ~***;..~...~..~-..~...~...~...~**. .z..b~-~4..]...~.-L~ ....... ~...~...~...~..b.~...~...~..~...~...b~...~...bb~..~..~..~.~...~...~...~..~...~...~...~ ....... ~-.~...~..~...~...~...~...~..~ ....... ~...~...~..~...~...~...~...~...~...~..~...~..~..~...L~...I...~...~.....~...~...~...~...~...~...~...~...~ .... "'f"t'-?"H-"H'-?"~--'"'H'"H-'~"H'"?"?" "'?"PH-'H'"H"'P ~-~-~-'~-~"H-'-H ....... ?"?-~'"H'"~'"Pf'"'"H'"H'+'H'"?"f" %"H'"~-' ""?"H"'~'" '"?"H"'H'"H"'?"~ .... · 'T"~-r"r" '"~'"~'T'~'*"-'r'r'r"?"I"T'T'T"~'" "T"T'T'T'T'T'T'T'T"~'"?'~ ~?~'"~ "~'"~"'~'"~ ....... r'~'"~'"~*'T'T"r"r'~ ....... rT'T'T" '-?T'T"r""*T"~'"~'"~ ....... ?'T"?'? "*~"T'T"?'J'"T'T'T"! .... ~*-~*'*~**~*"~"~***~'*'**'*~'*~ ~ ~ ~ **~"*~*'*~*'*~ ~ ~ ....... ] ~ ] ]~"*~**'+***~ ...... *********************************~ ~ ~ ~ ~ ~ ~ ~ ~ ....... ~-~0~~*"**** .4-***I * *4 .... ~*****-4-~ ~'"* ~ ~ ~ ~" * '** ~ ~****"**. '** * ........... ~ ~' * '"**"****'****'*"~ ~ ~ j **"******'**"*~ ~ ~ ~ I ~ ~ ~ ~"*'*****"** .... · .~-b.H-.bb.bb.b.:,.-b.bb.H..-bbb.~.....-b~..-bb.b,.-.b-b-b-?.H--.H~-k-H...~ ...... b-b.b-b.b-b.b.bb~..-b-b.b~...b-b.H---b.-.+--H---b.....bbb.b---H...?..b.H*..~---H ...$**.~***~.~.* 1,**~...~***$***: ....... ~..~***$_.~_ .**~***~**.~...$... ,**~.**$...~**,$***L**L..~..~-.$*** ~***$-~...$***~... ~..~.~***$ ...... ~_.~..~.,.~*** ***~...~***~.~**~ .**~...$...~...~ ..... $...~...~.,.~_, ,_.$.**$***~.,,~ ...... ~l.,$,..~**,~ll*. ,*,~*,*~***~*,*~*,*'**,~*'*~*'*~,*.~ -~...~...~...Z..~...:...~.L~..~...~...~...Z.L~.-.~.-.~ ...... ~.-.~...~...~-.bL~-.~-..~ ....... ~...~...~...~:~.~..~ ...... ~...~...~.-Z.:...~...~_~...~i..~...~...~...Z.~...~...~...~.--~...~...~...~ ..... ~...~..~...L...~...~...L.~...I...~...b~...~- ...~.l.+...~..~..+..~..~...~...+... -'H-+-H'HH--'-H-H--H-"~'+-~ ....... ~"~--'~--~ ...... H.-H.--~-H--H-- .+H-H--H+.~.-'-'-~'-'~--.~...~.-.~'"+"'~"i'"~'"' -.-b~...;...b..+~..+..LH...b~...~., ..-b;..-H ....... ~.-H-..;..-....H..-H ....... H...H-.. ~+-*...~...~...~,..¢...~...~...¢......~...~-..~...~......~...~...~...~... ;,..~....~...~..-~...f..~...~-..~...~ ....... ~...~...~...~... '...~-~...~...~ ....... ¢..4. :..~.- - - [...i...~-~...~. ,.1...4...¢...¢... '...~...~...~...~....-.~...~,..~..-¢ ....... L.;...¢...¢.......~...~...~-.~ ....... ¢...~...~...~... · -tH--*~-.~ ...... t.-*HH~-...-+-.H+..+....--t---Ht-..~ ...... ~-.+*+-+-...+.+-.t.--. ....... ,.-+-+-H+...HH*-..~ ....... HHH~.-~~.~-+.+..~. HH+-.+..HHHHH ..+..*..+..~...'..+.+.+.+**..-+.+.+--~ ......~ ,..+.....+.. H+H-+H--~---,+HH--~-..H--~ ....... ~---~...~-..~---~---~---~-..~..-~ ....... H'H+H--H ....... ~---~---~-..~~ --~'~H'-f-.f-'~.---'H'+H"H'H'"'H-H'"~'-'~'-~'H- ................. ::::~:~:~ ~:::{~::: :::~::::: :::t:*'"*::: *::~:H-..:~::: ::::]:::: ::~:{'"*'-*"'*"'~ ....... *'"*'"*-'H'"*'"?*: : ::::: :-~.-.~.--~--.~.-.i-..~---~---~--.~---~...~-..~.--~---~---~-..~...~..-~.--~ ....... ~--.i.-.~.--~--.I---~--.~-..i...~ ...... i.-~--~-~---~.-~---~--.~-.-~ ....... ~---~..-~---~...t.-.~---~.--i.--~ ....... ~-.-~.--~-..~-..b.~..-~...~..-.~ ........ ~-+-~---~-.-L~--~.+.-}..-~-H..H-.~H...~...t-.' :::::::::::::::::::::::::::::::::::::: :::::::::::::::::::::::::::::::::::::::::: :::::::::::::::::::::::::::::::::::::::: :::::::::::::::::::::::::::::::::::::::: :::::::::::::::::::::::::::::::::::::: :::::::::::::::::::::::::::::::::::::::::: :::::::::::::::::::::::::::::::::::::::: :::~:::~:::~:::~:::~ :::~:::~:::~:::~::: ..~...~...~.,.~,.4...~...~...~...~.1. ,-.~....~...~...~.......~...~...~...~ ...... $1..~...~...~...~...~..,~...~...~ ...... ~-..~--.~---~.--H-~---~--.~.-~ ....... ~---~-..~.-.~...L.~..-~---~.-.~... ,...~...~...~...;,,.~l.,~..l~...Z ........... ~...~,...~...~...~...~ ....... ~.,.~ ...... ~...~,..~...~,.,~ .,,~,l.~--,~...~... ' ' : : : ~ ~ ~ ~: J : : : : : : i: : : ~" ' ~: : ~ : : : : I i: 1. : : / ~ ~ : I .~...~...?..?..~...~...?..?..~...~'''T--?'''? '''~''?'??' '''~''''~'''?-- ?y'S'''?~'--S ...... ?'???''t'''??''?~ ...... t'''?''t'--t'''~?--~'''?''~~--'??''?-- '''??''?''~ ....... ???'?''' I'''~'''?''?"? ....... ?'~"'~'''?t'''~--'~'''?S ....... ?'''~'''??--~--'77"'~'''?'': "'T '''T--'~'''? ...... ~'+-~'-'?--~"-~'"H-'-~'-'?"-'-H---H-'-t'"~-"~-'-H ....... ....... ?-?"H---~'"~ ....... ~...~ ....... H...?..H..1.?...?..pt ........ ~.+.?..?..p~...~...?..~ ....... ~"?"t"'~'"f"~'"~'"'~'"~'" :::::::::::::::::::::::::::::::::::: ::::::::::::::::::::::::::::::::::::::::: :::::::::::::::::::::::::::::::::::::::: ::::::::::::::::::::::::::::::::::::::: ::::::::::::::::::::::::::::::::::::::: ::::::::::::::::::::::::::::::::::::::::: ::::::::::::::::::::::::::::::::::::::: ::::::::::::::::::::::::::::::::::::::: ~..~.~..~..~.~...]..~...~.......~-~...~...L.:...L~...LL.~...~...~...LL:...Li..L] ....... ~..~...~..LLLLi..] ...... ~..LLL,...LI~...L.L ...L~...~...~...{...~...~...~...~ ....... ~...~...~...G..~...~...L~......~...~...~...~..J...~...~...L~... ..~...~...~-.~...I...~...~...~...~..."..~...~...~...~...i...~...s..~-.~.......~...~...~...~ I'"~'"~'"~'"~ ....... ~'"~-'~-'q'"~'"~'"~'"~ ...... ~--'~'-'~'-q'?--~"'~'-'~ 'i"'~-'~--'q-"-~'"~'"t'"t-'i-'~-"~'"~"'U'"t'"~'-~"'~ ...... ~'"y~'"~-l'"~'"~'"t'"~ .... -ZOO0 - I SO0 - ] 000 -500 0 500 1000 1500 EAST EXACT RAOIWS OF CURVATURE METHO0 TIE-IN LOCATION MEASURED DEPTH O. 0 FT TRUE VERTICAL DEPTH 0.0 FT DISTANCE NORTH 0.0 FT DISTANCE EAST 0.0 FT BOTTOM HOLE COURSE LENOTH COURSE AZIMUTH MEASURED DEPTH TRUE VERTICAL DEPTH DISTANCE NORTH OISTANCE NEST LOCAT I ON 2S21.6 FT 315.2 OEO 9984.0 FT 9209.8 FT ]8S9.9 FT 1848.2 FT REF 00007]~67 Form to be inserted in each "Active" well folder to check for timely compliance with our regulations. OPERATOR7 WELL NAME -AND NUMBER Reports and Materials to be received by..~~~~_~e-- ,,, Required Date Received Remarks Completion Report y~.~ ,~.~/_~ ~/~f~' . Samples m -- ~- ~! .- ~~, ,, Mud Log ~:- ~/ -- . :~, ..... Core Chips Registered Survey Plat Inclination Survey 'Drill Stem Test Reports , ~~ ,, -, , ~ ,, , Production Test Reports Log Run SOHIO ALASKA PETROLEUM COMPANY DALI,AS ARCO EXXON TO PHILLIPS STATE OF AK 3111 "C:' STREET ANCHORAGE. ALASKA TELEPHONE 1907! 265-0000 MAIL: POUCH 6-612 ANCHORAGE, ALASKA 99502 Date: 03/11/86 T#: 76925 REFERENCE: SOHIO HAGNETIC LIS TAPES & LISTINGS The following material is being submitted herewith. Please acknowledge receipt by signing a copy of this letter and returning it to this office:-- ~ R-26A O,H, tape 02/23/86 #1 9101'-9683' Sch#71306 Pos.#03951 "'~'* R-t2 C H tape 02/21/86 #1 10200'-10968' Sch#71289 Pos f~03950 * D-27 O,H, tape 02/24/86 #1 8982'-9769' Sch#71316 Pos.#03949 * EX,XON: An Asterisk (*) next to a listing above means you should have received the Tape(s) 'and Listing(s).direc~t!y from the respective service company. Please confirm this. RECEIVED C~ E ~ Alaska 0il & Gas Cons. Commiss~n WELL RECORDS LR2-! MEMORANDUM State-of Alaska TO: THRU: FROM: AIAS~ OIL ~ GAS (3DNSERVATION O~SSION ~ssioner ~by Foster~,~~ ~' Petroleum Inspector DATE: February 19, 1986 FI hE NO.' TELEPHONE NO.' SUBJECT: BOPE test on Sohio - P.B.U.-D-27 Permit #86-33 Prudhoe Bay Field Saturday,. Februaz"f 15, 1986_: The BOPE test beg~n at 3:00 p.m. and ~as '~leted' at--4:30 p'ml As the attached BOPE test shows there w~re no failures. In ~, I witnessexj the BOPE test on Sohio's D-27 Attac~nt 32-001 A ( Rev 10-84) ~4 STATE OF ALASKA ALASKA OIL & GAS CONSERVATION COMMISSION B.O.P.E. Inspection Report !nspe6tor Operator Wen Location: Representative ~e~ ~ /3~~ing S~ Ri~ ~t/~ Representative Location, General .~ Well Sign General Housekeeping~/~' Rig. ~ Reserve Pit ~F' Mud Systems Visual Audio Trip Tank Pit Gauge Flow Monitor Gas Detectors BOPE Stack Test Pressure Annular Preventer / ~-~-~ Pipe Rams Blind Rams / Choke Line Valves / H.C.R. Valve Kill Line Valves Check Valve ~ -- · .. · Test Results: Failures '~. ACCUMULATOR SYSTEM Full Charge Pressure_~O-~ psig Pressure After Closure /~d3 psi~ .~.' Pump incr. clos. pres. 200 psiR Full Charge Pressure Attained: ~ min/~_sec. N~ ?~ .v~ ~ P~~ ~., 1~-%~ ...... Controls: Master ~~ Remote %~-Blinds switch cover Kelly and Floor Safety Valves '" ~', Upper Kelly. / Lower Kelly / Ball Type / Inside BOP / Test Pressure Test Pressure Test Pressure Test Pressure Choke Manifold ~.~ Test Pressure No. Valves /¢' ' No. flanges Adjustable Chokes Hydrauically operated choke Test Time / ~z_~hrs. Repair or Replacement of failed equipment to be made within d.ay~ and Inspector/ min~_ sec. · Commission office notified. Remarks :- - - Distribution orig. - AO&GCC cc - Operator' cc - Supervisor January 31, 1986 Mr. R. S. A1 lan · District Drilling Engineer Sohio Alaska Petroleum Company P.O. Box 196612 Anchorage, Alaska 99519-6612 Telecopy: (907) 276-7542 Re: Pz-~dhoe Bay Unit D-27 Sohio Alaska Petroleum Company Permit No. 86-33 Sur. Loc. !605'SNL, 1692'WEL, Sec. 23, TllN, R13E, UM. Btmhole Loc. 300'NSL, 1595'EWL, Sec. 14, TllN, R13E, Ul.i. Dear Mr. Allan: Enclosed is the approved application for permit to drill the above referenced well. The permit to drill does not indemnify you from the probable need to obtain additional permits required by law from other governmental agencies prior to commencing operations at the well site. To aid us in scheduling field work, please notify this office 24 hours prior to commencing installation of the blowout prevention equipment so that a representative of the Commission may be present to witness testing of the equipment before the surface casing shoe is drilled. ~there a diverter system is required, please also notify this office 24 hours prior to commencing equipment installation so that the Con~nission may witness testing before drilling below the shoe of the conductor pipe. Alaska Oil and Gas Conservation Commission BY ORDER OF %~HE CO~R~ISSION dlf Enclosure CC: Department of Fish & Game, Habitat Section w/o encl. Department of Enviror~mentaI Conservation w/o encl. Mr. Doug L. Lowery SOHIO ALASKA PETROLEUM COMPANY 900 EAST BENSON BOULEVARD ANCHORAGE, ALASKA TELEPHONE (907) 561-5111 P.O. BOX 6612 ANCHORAGE, ALASKA 99502¢)612 January 28, 1986 Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Attention: Mr. C.V. Chatterton Wel 1 D-27 (24-14-11-13) PBU Gentlemen: Enclosed are the following documents in triplicate along with our check for $100.00 to cover the permit filing fee. · 2. 3. 4. 5. Application for Permit to Drill Proposed Drill ing Program Outline Proposed Blowout Prevention Diagram Surveyor's Plat showing Well Location Directional Map If you have any questions, please call Ted Stagg at 564-5173. Yours very truly, SOHIO ALASKA PETROLEUM COMPANY R. S. Allan Division Drilling Engineer RSA/MAW/dg/O144D Enclosures CC: D. A. Walters Well Records- V. Aldridge Well File #17 RECEIVED .~-'- STATE OF ALASKA ALASKA,,,.,_ AND GAS CONSERVATION CL PERMIT TO DRILL 20 AAC 25.005 .,~IlSSION la. Type of work. DRILL REDRILL DEEPEN lb. Type of well EXPLORATORY [] DEVELOPMENT OIL [] DEVELOPMENT GAS [] SERVICE [] STRATIGRAPHIC [] SINGLE ZONE [] MULTIPLE ZONE [] 2. Name of operator Sohio Alaska Petroleum Company 3. Address P 0 Box 196612 Anchorage Alaska 99519.-6612 4. Location of well at surface ~ )t~U[~ 1605' SNL, 1692' WEL, Sec. 23, Tll~, R13E At top of proposed producing interval ~ 200' NSL, 1700' EWL, Sec. 14, Tll~, R13E At total depth N 300' NSL, 1595' EWL, Sec. 14, Tll~, R13E 5. Elevation in feet (indicate KB, DF etc.) 60' KBE 6. Lease designation and serial no. ADL 28285' 9. Unit or lease name Prudhoe Bay Unit 10. Well number D-27 (24-14-11-13) PBU 11. Field and pool Prudhoe Bay Prudhoe 0il Pool 12. Bond information (see 20 AAC 25.025) Type Blanket Surety and/or number Safeco Ins. 2975387 Amount $200,000 13. Distance and direction from nearest town 14. Distance to nearest property or lease line NW of Deadhorse 1 0miles ADL 28284 1700! feet 16. Proposed depth (MD & TVD) 9801'MD 92 04'TVD BKB feet 17. Number of acres in lease 2560 19. If deviated (see 20 AAC 25.050) KICK OFF POINT 2800feet. 2504o'J 2o.Anticipated pressures MAXIMUM HOLE ANGLE I (see 20 AAC 25.035 (c) (2) 15. Distance to nearest drilling or completed we. D-6 1 6Clrl feet 18. Approximate spud date February P.~ '19~35 3.';:)I) psig@ Surface ~-300 psig@ ~00 ft, TD {TVD) 17½" I 12~" I SIZE casing Weight 20" 3-3/8 72# 9-5/8 47# 8½" 7" 29# 22. Describe proposed program: CASING AND LINER Grade t Coupling Conductor L-80 JButt. L-80 lButt.. L-80 m utt. Proposed Casing, Liner and Cementing Program SETTING DEPTH Length 80 2650 8975 1046 MD TOP TVD Surfac6 Surfac~ Surface 8755il 8256' I MD BOTTOM TVD llO' llO 2680'I 2620 9005'~ 8483 I 9801'l i 9204 QUANTITY OF CEMENT (include stage data) 8 cu. yds. concret 3720 cu. ft. Permafro ' 1603 cu. ft. Class G+ 230 cu. ft. Class G ' 300 cu. ft. ClasS G See attached Proposed Drilling and Completion Program. RECEIVED A~a~ka Oil & Gas Cons. Commission Anchor39e 23. I hereby certify that the foregoing is true and correct to the best of my knowledge ~~Co~m~Zu ~ Division SIGNED ~/~.~'A TITLE Drilling Engineer The space below for s CONDITIONS OF APPROVAL DATE Samples required Mud log required Directional Survey required I APl number J o-o.z. q-,z / Permit number Approval date ~"..'~ ], .-'"'h 0_1/31186 SEE COVER LETTER FOR OTHER REQUIREMENTS APPROVED BY __ COMMISSIONER DATE January 31; 1 9RA ~_ ~/ ~-/" ~ L~~~r~l~"~ by order of the Commission Form 10-401 :: Submit in triplicate Rev. 7-1-80 st 3%Gel ~/5% KCL PROPOSED DRILLING AND COMPLETION PROGRAM WELL D-27 [ 24-14-11-13 ] PBU Install and cement 80' of 20" conductor to surface. Drill 17 1/2" hole to 2700' and cement 13 3/8" L-80 Buttress casing to surface. Install blowout prevention equipment consisting of 5000 psi W.P. pipe rams, blind rams, and annular preventer. Maximum possible bottomhole pressure is 4390 psi at 8800' TVDss based on original resevoir pressure. Maximum possible surface pressure is 3330 psi based on a gas column to surface from 8600' TVDss and an oil column to 8800' TVDss. Directionally drill 12 1/4" hole to the 9-5/8" casing point above the Sadlerochit Sandstone. Run 9 5/8" 47# L-80 Buttress casing to within 5' of 12 1/4" TD and cement in two stages: First stage using Class G cement around the 9 5/8" shoe. The second stage to be downsqueezed in the 13 3/8" x 9 5/8" annulus followed by nonfreezing fluid. Directionally drill 8 1/2" hole to TD. Run 7" liner from TD to 250' inside 9 5/8" casing shoe and cement using Class G cement with 5% KCL. Clean out to 7" float equipment. Change over to 9.6 ppg. NaCl completion fluid. Test casing and lap to 3000 psi. Run 9 5/8" production packer on internal plastic coated tubing with gas lift mandrels and a sliding sleeve. Set packer 50' above top of liner. A subsurface safety valve with dual control lines will be placed 50' below base of permafrost. Install and test Xmas tree. Displace tubing to diesel. Set and test packer. Suspend well for perforating subsequent to rig release. Tubing Size: 4 1/2", 12.6#, L-80, A/B Mod, BTC, IPC with 7 GLMs Tailpipe Size: 4 1/2", 12.6#, L-80, BTC PROPOSED DOWNHOLE DIAGRAM WELL D-27 [24-14-11-13] PBU PROPOSED DEPTH · BKB 20" Conductor -Ball Valve 110 2050 13-3/8" Casing Shoe 17 1/2" Open Hole 2680 2700 4 !/2", 12.6#,_.L,80,?A/B Mod, .BTC, '.IPC with 7 GLMs 9801 ,7' Liner Sh~ 9~C~I/~D B .O. P~-S TA C K CON FIGUF'~ TION I :5 5/8" TRIPLE RAM STACK 5000 PSI WP DRILLING ' i ANNULAR PREVENTER - PIPE RAMS BLIND RAMS CHECK 2= KILL UNE HAND GATE GATE DRILLING SPOOL 4" CHOKE LINE GATE HYDR. ASST. GATE PIPE RAMS oO 40 I0 20 30 ..... 40 I0 20 30 40 04 (propos.~ ~,875' O3 950' D~17(Proposed) mt, (Pr°p°$ed) ~j_. 0l '~0~- 02 03 D- 20 Proposed 2100' . D-21 / ~ I00' . (Proposed_~ D -21 ~ PAD DETAIL ii I SCALE I : 300 PORTION OF T II N, R 13 E,UM SCALE I": I/2 MILE CERTIFICATE OF SURVEYOR I hereby certify that lam properly registered to practice land surveying in the Stere of Aloske <]nd thef this plat represents a Iocetion survey of the wellped shown and the wells thereon. This survey wes mode by me or under my supervision (]nd oll dimensions (]nd other der(ills ere correct. Bottom hole Iocations__~are furnished by others. F ,,' ,:-,,~,~ L~ Date ~urveyor NOTE: All bottom holes ore 8800'sub se(]. REVISED [)-26 BHL REVISED D-Z7 LOCATIONS ADDED PROPOSED D-Z6 BHL ADDED PROPOSED D-Z7 S D-28 BHL ADDED PROPOSED D-25 BHL ADDED PROPOSED D-22 BHL ADDED PROPOSED D-20 ~ D-21 BHL ADDED PROPOSED D-19 BHL ADDED PROPOSED D-18 BHL ADDED PROPOSED D-17 BHL R CFtVED : ,11/16/85 '---II/15/85 J/:, i 2 9 "~''' r:.,.,. ~0/ ~7 /~,~ ~' 00 ~_.._ I0 / 16/85 4 / 2/82 Alaska u ..... o udh5. uulflmJss[o /19/82 Anchorage ~ / 4/sz iz/~O/el ~z / e/81 I I PLAT 3 of 3 PAD "D" EXTENSION Located ~n E I/2 PROTRACTED SEC. 23,TII N, R 13E, UMIAT MERIDIAN, AK. Surveyed for SOHIO ALASKA PETROLEUM CO. Surveyed by OCEAN TECHNOLOGY, LTD. 5333 FAIRBANKS ST., SUITE II ANCHORAGE~ ALASKA 99518 ...". . · --~'-";~' I '-"-}~, ' .. ;:x- ! , ,'/ T '\ ::. 711 : : ,.. (~:'Y' ~'/.,,- -:. / ::- - ./. . ...... '' i':'Z- '::':' .... ':": ~':'- '" .-' " ~_~I -~. - ~ ' ' il .~..' :~.... .. II x. -'"~"'"': l~ II .i :~7; ' ' '~ ' :' , .$1 5CU~12: E'~..,NJ1 33 ~2 ?.CLOS~. SH02~ ?. L ! ~; I Location = W-E $-N TVS(S3S) --- Closest AOproa~n ~q~lysls --- depths in feet ~elo~ Kelly 3uzhin; (~) WELL IDENT a02~-200540C O-1 ~029-Z005o00 ~0£?-2005~00 ~029-2058900 D-10 ~029-204~500 D-11 0-13 ~029-20~5000 U-I~ D-16 ~029-2069200 ~-17 0-18 0-19 D-22 2-20 ~29-207~0~ 0-21 Closest Approach Vert~ca! Intersection /PROPOSE~\ IN~AR~¥\ CLCSEST IPROPC$~D\ TV~ O~PA~T TVD CEPART OI~T~CE TV9 C£PA~T TVC 102.5 0.0 100.0 O. 5 ~1'$.1 2.£ 0.0 O.O 0.0 3~3. ~ 305.7 ~1C 5.5 711.4 2800.0 '0.0 2801.5 2.1.9 ' 3583.9 13~. 2 3903.0 19~.4 9J6.8 4463.0 548,9 479 ~. 9 975,1 C.O 0.0 10.0 0.0 ' 1 5~'~'& 5834.5 11S1.0 501~.~ 2209.~ 12~2.6 O.'O O.O 7.6 0.0 1~.~4.7 ~8.4 O.O '100.0 0,~ ..... I 2999.7 8.7 3110.~ 35.9 1 ~.60. ? 3768..5 214.7 4225.6 555.$ 1 '0.0 ' 0.'0 '17,'$ 0,0 ...... 0.0 O.O 16.6 O. ~": ~.2 0.0 O.O 13.~ 0.1 0.0 0.0 15.0 0.1 0.0 0.0 17.9 0.~ 56.2 2~. 7~. 3 3.0 .~7. Z ~.8 I 33.5 0.0 O.U 7.9 0.0 16~.1 C.O ~.0 11.3 0,0 54.1 C.C J.'] 13.7 O.O r vERTICAL ! .$15DUA12:EORAN013]O~? CLOSAP SHORTT.LI$;1 28-JAN-1956 ~" SUMMARY .~ ~'~ "-~"~'Z~'-- ' ?~:-.:~ ..................... ~'~ ........................................ .............. ,~'~,~. ...................... .~.,,~ - · ( ;~ a029-2078800 0-21 ( ? CloSest ~pproach d~st~nce ~ "54.1 feet ,- . . ~ .... :%: ~':~;~:?F~:,.' . ,, .... ~o KZCK OFF foe ~h~s eun ~ 2800.0 feet .............. ,~Y~' ~F~:,~:~i~:,; ;,;~':.";'~-;'~:~':~:"~ '",?~:",~.~; ~..~ ',' ~";~;~': ':., ...... . . .', ', .... ,. ,, ,,: ....... ~ ,~ ~ ...... '.'.--.~T, ¥..., · .. ~; , :.~* .. ',~.,,,~.,,~,~, :-.:~.~ ~,~,.*~,~?,:s :~,~,~,, .~-  ~ ~' . :,,. ... .. ~ .... · . ~~_~ ..... ~ ........................................ ~ ............ ~:~ ...... .." __$ 1 SDUA1 2: ~'.DRAN01 3] D27_CLOSAP_ SHORT. LIS; 1 Seerch Rad£us= 1606 COURSE LINE For proposed well: D-27 £2&-14-11-13] Location = W~E.- . - S-N T¥O (S~$):;;j~; ....... Top :./ 653~61~00 §959382.00: '-60.00 "~:':'i : Bottom. 651430.52. 596~[246.62.': 2S-JAN-1986 07:29 Page 1 --- Closest Approach Ana._l. ysi$ .... _ Date: 28-JAN-86 '.TLme: 07:~8:57 .... C~osest 'Approach Vert~c~ IPROPOSEO~ ' ' /NEARBY~ C~EST IPROPOSEO~ /NE4RBT~.~ " VERTZCA'L" TVO OEPART TVD OEPART ~O~NCE TVD OEP~RT TVO DEPART DZSTANCE . ~,'~ Note: AL1 depths Zn feet Beloe Kelly 3ushing (8K8) WELL ZDENT ~0Z9-2005400 D-1 102,5 0.0 A02~-2005600 D-& 2,2 0,0 O-J ~.I 51.9 Jg&.o Aozg-2005800 O-S ~T '.0~0.? · 72801,S. : .~ .." 21'~ 9~,','~ '~ -~9 ." ..,u ' AO29-2014BO0 , .; ~';~:" '. ..... ' 0-6 __ 3489.2 106~1:' 3806,7 .'.' '163.8 _~9~5 . -' ,:. 46S6.5 6¢4,0 4950.0 1162.5 ~93.2 _ .. , -- 5Z79.9 9~1 6 5594.~ 1~08.0 D-12 0,0 0.0 7.6 0.0 1,~64,7 ~029-Z016200 0-? AOZ9-Z038900 ...... A029-204~500 D-11 O.O O. O .~5 4'. 2 ~,Z55.3 847.? 4,54,9 Aozg-2g4~900 AOZ9-2045000 O-l& 2999.7 ~, 0'29';'20z.'~ 1~0 ........... 0-15 ~7~9.~ 40J~9-2068 300 0-17 0.0 U-l~ ~0~9-207C700 D-la' O.O ~0Z9-~073700 O-2Z O.O ~9Z9-2073~00 ' -Jc~-2O7:000 O-ZO 0.0 ~G~-207~00 0-21 0.0 8.7 3111~1 35.9 Z24.4 4249.6 574.2 1066.9 '.' ) 0='0-------~17~, 5 :O~'O ...... ~ ~'0 ¢-=2 ..... ' ...................................................................... ~.. o.~ 0,0 . 16.6 0.0 13,4 0,1 '0;'0 .............. 1 8';'0 ............... 0;'1 .......... j?&.l ....................... ! .......... 0.0 17.9 0,3 0.0 24~7,2 ~4,8 13J.5 0.0 " 7.9 0,0 ..... ~6~,1 0.0 11.3 0,0 5~,1 ......................... ~ ............................. 0.0 10.7 0.0 _$15DUA12:[D2ANO13]D2?_CLOSAP_$HORToL]$;1 ) ~07.9°2078800 D-Z1 ':' ~ICK OFF for th~s run = 2800.0 feet ~-~:~:.:,:..~... ;~.. --.., ". , ~. -..,'~.~,'?/~,~:~ ....~ ~.~ .,:~ .... · -~.~:~ ,.& .' -, , ITEM (1) Fee (2) Loc iST FOR APPROVE' (2 thru 8) : , ,-;:(8). - ' c (-3) Adm:l.n ' ~K /-2..~---~'~o (9. thrU 12)'. 'i ( 10 -and (22 thru 26) Geology: HWK M I~A~ JAL rev: 03/1 6.011 Engineering: MTM ~ HJH ~ 3/85 ., . mpany _ YES' Is the permit fee attached - ee®®ee®e®®e®®eeeeeeee~®®e®®ee ' ~, , 2. Is well to be located in a defined pool ............................. 3. Is well located proper distance from property line .................. 4. Is well located proper distance.from other wells .................... 5. Is sufficient undedicated acreage available in this pool 6. Is well to be deviated and is wellbore plat included ................. 7 Is' operat the only affected p~rty · or eeeee®e®eeeeeeeeeeeeee~ee··e®eeee 8. Can permit be approved before ten-day wait .......................... e I0. 11. 12. 13. -14. 15. 16. 17. 18. 19. 20. 21. 22. 23. 24. 25. 26. 27. REMARKs Does operator have a bond in force f~ ®e®e®e~ee®eeeeeeeeeeeeeeee·eeeeeee Is a conservation order needed ...................................... ~K Is administrative approval needed ~ elee®eeeeeeeeeeeeeee~eeeeeeee®eeeee th b - Is e lease hum er appropriate .................................... Is conductor string provided ........................................ ~ Is enough cement used to circulate on conductor and surface ......... ~ Will cement tie in s6rface and intermediate or Production strings ... ~ Will cement cover all known productive horizons ..................... ~_. Will surface casing protect fresh water zones .............. ~ Will all casing give adequate safety in collapse~ t~n~io~ ;~d°~ur~t . _./~,~ Is this well to be kicked off from an existing wellbore ............. Is old wellbore abandonment procedure included on 10-403 ............ Is adequate wellbore separation proposed ............................ ~ Is a diverter system required ....................................... Are necessary diagrams of diverter and BOP equipment attached ....... ~ Does BOPE have sufficient pressure rating - Test to ~-'O~C) psig .. ~ Does the choke manifold comply w/API RP-53 (Feb.78) .................. Is the presence of H2S gas probable ................................. Additional requirements ............................................. ~If " INITIAL GEO. UNIT ON/OFF POOL CLASS STATUS AREA NO. SHORE , . ,, , , ,,, o H o Well Histo.ry File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history file, To improve the readability of the Well History file and to simplify finding information, information, of this nature is accumulated at the end of the file under APPENDIX. No special'effort has been made to chronologically organize this category of information. .. RECEIVED * * 0CT 02 1998 * ALASKA COMPUTING CENTER * * * Alaska Oil & Gas Cons. Commissio~ .............................. ~O~omge * ....... SCHLUMBERGER ....... * * ............................ . ****************************** COMPANY NAME : BP EXPLORATION (ALASKA) WELL NAME : D-27 FIELD NAME : PRUDHOE BAY BOROUGH : NORTH SLOPE STATE : ALASKA API NUMBER : 500292154300 REFERENCE NO : 98491 LIS Tape Verification Listing Schlumberger Alaska Computing Center 30-SEP-1998 15:50 PAGE: **** REEL HEADER **** SERVICE NAME : EDIT DATE : 98/09/30 ORIGIN : FLIC REEL NAME : 98491 CONTINUATION # : PREVIOUS REEL : COF~_~f : BP EXPLORATION, PRUDHOE BAY, D-27, API #50-029-21543-00 **** TAPE HEADER **** SERVICE NAME : EDIT DATE : 98/09/30 ORIGIN : FLIC TAPE NAME : 98491 COITTINUATION # : 1 PREVIOUS TAPE : COF~ENT : BP EXPLORATION, PRUDHOE BAY, D-27, API #50-029-21543-00 TAPE HEADER PRUDHOE BAY CASED HOLE WIRELINE LOGS WELL NAME: D- 27 API NUMBER: 500292154300 OPERATOR: BP EXPLORATION (ALASKA) LOGGING COMPANY: SCHLUMBERGER WELL SERVICES TAPE CREATION DATE: 30-SEP-98 JOB NUMBER: 98491 LOGGING ENGINEER: H KIRKBY OPERATOR WITNESS: M KISSINGER SURFACE LOCATION SECTION: 23 TOWNSHIP: 11 N RANGE: 13E FNL: 1606 FSL: FEL : 1692 FWL: ELEVATION (FT FROM MSL O) KELLY BUSHING: 71.90 DERRICK FLOOR: 70.40 GROUND LEVEL: 41.50 WELL CASING RECORD OPEN HOLE CASING DRILLERS CASING BIT SIZE (IN) SIZE (IN) DEPTH (FT) WEIGHT (LB/FT) 1ST STRING 8. 500 7. 000 9784.0 29. O0 2ND STRING 3RD STRING PRODUCTION STRING CURVE SHIFT DATA - ALL PASSES TO STANDARD(MEASURED DEPTH) · 30-SEP-1998 15:50 PAGE: 2 LIS Tape Verification Listing Schlumberger Alaska Computing Center BASELINE CURVE FOR SHIFTS LDWG TOOL CODE: LDWG CURVE CODE: GR RUN NUMBER: PASS NUMBER: DATE LOGGED: LOGGING COMPANY: BASELINE DEPTH .............. 88888.0 9553.0 9549.0 9521.5 9515.5 9505.5 9495.5 9492.0 9481.0 9473.0 9451.5 9444.5 9428.5 9427.5 9418.0 9408 5 9408 0 9398 5 9397 5 9390 5 9380 5 9379 5 9377.5 9377.0 9373.5 9371.5 9371.0 9368.5 9360.0 9337.5 9334.0 9328.0 9320.0 9319.5 9305.5 9305.0 9301.5 9301.0 9293.0 9291.0 9285.5 9282.0 9281.0 9267.5 9258.0 .......... EQUIVALENT UNSHIFTED DEPTH .......... GRCH CNTD 88886.5 88886.5 9551.5 9551.5 9546.5 9546.5 9519.5 9519.5 9513.5 9513.5 9503.0 9503.0 9493.5 9493.5 9490.5 9490.5 9478.5 9478.5 9471.0 9471.0 9449.5 9442.0 9425.5 9416.0 9405.0 9396.5 9388.5 9379.5 9377.0 9372.5 9370.5 9367.0 9360.5 9335.5 9333.0 9327.5 9319.0 9305.5 9300.5 9291.0 9289.0 9280.5 9266.0 9425.5 9416.0 9406.5 9397.0 9388.5 9379.5 9377.0 9372.5 9370.5 9367.0 9360.5 9335.5 9333.0 9327.5 9319.0 9305.0 9300.5 9285.5 9281.0 9265.5 9256.5 LIS Tape Verification Listing Schlumberger Alaska Computing Center 30-SEP-1998 15:50 PAGE: 9257.5 9256.0 9248.5 9249.5 9249.5 9241.0 9241.5 9241.5 9232.5 9231.0 9232.0 9230.5 9229.0 9227.5 9228.5 9227.5 9226.5 9225.5 9226.0 9225.5 9224.5 9223.5 9223.5 9212.5 9211.5 9212.0 9212.0 9199.5 9198.5 9199.0 9199.0 9196.5 9196.0 9192.0 9191.5 9190.0 9189.0 9189.0 9189.0 9183.5 9183.0 9183.0 9180.5 9178.5 9168.5 9168,0 9167.5 9167.5 9166.0 9165.0 9165.0 9159.5 9160.5 9155.0 9154.5 9154.5 9154.5 9151.5 9150.5 9151.0 9150.5 9147.0 9146.0 9146.5 9145.5 9144.5 9144.0 9144.0 9143.0 9142.0 9141.5 9138.5 9136.5 9137.0 9135.0 9133.5 9133.5 9132.0 9130.5 9116.0 9114.5 9114.5 9113.0 9113.0 9110.0 9110.0 9111.5 9108.5 9108.5 9108.5 9107.5 9107.5 9104.5 9102.5 9102.5 9100.5 9098.5 9093.5 9091.5 9091.5 9090.5 9089.0 9088.5 9086.5 9086.5 9085.5 9083.5 9082.5 9081.0 9081.5 9081.0 9079.0 9078.0 9078.0 9078.5 9073.5 9071.5 9073.0 9071.5 9071.5 9069.5 9071.0 9070.0 9064.0 9061.0 9057.0 9056.0 LIS Tape Verification Listing Schlumberger Alaska Computing Center 30-SEP-1998 15:50 9056.5 9056.0 9052.5 9051.5 9051.5 9050.0 9049.0 9048.5 9049.0 9046.5 9046.0 9046.0 9044.0 9043.0 9043.0 9037.5 9037.0 9036.5 9037.0 9034.5 9033.0 9033.0 9031.5 9031.0 9030.0 9028.0 9029.5 9028.0 9024.5 9024.0 9024.0 9021.0 9020.0 9020.5 9020.0 9006.0 9007.0 9000.5 9002.5 9003.0 8992.5 8992.0 8992.0 8981.5 8980.5 8981.0 8980.5 8974.5 8973.5 8974.0 8973.5 8969.5 8968.0 8968.0 8961.0 8960.0 8960.0 8957.0 8955.5 8956.5 8955.5 8951.5 8949.5 8951.0 8949.5 8942.0 8941.5 8941.5 8941.5 8929.5 8928.0 8929.0 8927.5 8920.0 8919.0 8919.0 8917.0 8916.5 8916.5 8916.5 i00.0 99.5 100.0 REFL~KS: CONTAINED HEREIN IS THE LDWG FORMATTED CASED HOLE CNTD DATA AQUIRED ON BP EXPLORATION'S D-27 WELL. THE DEPTH SHIFTS SHOWN ABOVE REFLECT CORRELATIONS BETWEEN GRCH PASS #1 AND THE BASE GAM~A RAY, ALSO PASS #1 NPHI AND THE BASE GAF~IA RAY, CARRYING ALL CNTD CURVES WITH THE NPHI SHIFTS. THE FIELD TAPE FOR THIS LOG WAS LOST. THERFORE, THIS TAPE ONLY CONTAINS THE CURVES DISPLAYED ON THE BLUE LINE PRINT, SINNCE THE DATA HAD TO BE DIGITIZED. $ $ PAGE: LIS Tape Verification Listing Schlumberger Alaska Computing Center 30-SEP-1998 15:50 PAGE: **** FILE HEADER **** FILE NAME : EDIT .001 SERVICE : FLIC VERSION . O01CO1 DATE : 98/09/30 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NDI~BER: 1 EDITED CURVES Depth shifted and clipped curves for each pass in separate files. PASS NUMBER: 1 DEPTH INCREMENT: 0.5000 FILE SUFk4ARY LDWG TOOL CODE START DEPTH STOP DEPTH GRCH 9563.5 8909.5 CNTD 9576.5 8910.0 $ CURVE SHIFT DATA - PASS TO PASS (MEASURED DEPTH) BASELINE CURVE FOR SHIFTS LDWG CURVE CODE: PASS NUMBER: BASELINE DEPTH $ .......... EQUIVALENT UNSHIFTEDDEPTH GRCH CNTD REMARKS: THIS FILE CONTAINS CASED HOLE CNTD PASS #1. NO PASS TO PASS SHIFTS APPLIED TO THIS DATA. $ LIS FORMAT DATA THERE ARE ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 28 4 66 1 LIS Tape Verification Listing Schlumberger Alaska Computing Center 30-SEP-1998 15:50 PAGE: 6 TYPE REPR CODE VALUE 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 36 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 0 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 1244176 O0 000 O0 0 1 1 1 4 68 0000000000 NPHI CNTD PU-S 1244176 O0 000 O0 0 1 1 1 4 68 0000000000 CFTC CNTD CPS 1244176 O0 000 O0 0 1 1 1 4 68 0000000000 CNTC CNTD CPS 1244176 O0 000 O0 0 1 1 1 4 68 0000000000 GRCH CNTD GAPI 1244176 O0 000 O0 0 1 1 1 4 68 0000000000 TENS CNTD LB 1244176 O0 000 O0 0 1 1 1 4 68 0000000000 CCL CNTD V 1244176 O0 000 O0 0 1 1 1 4 68 0000000000 ** DATA ** DEPT. 9576.500 NPHI. CNTD 24.170 CFTC. CNTD 633.609 CNTC. CNTD 2967.029 GRCH. CNTD -999.250 TENS. CNTD 1380.088 CCL.CNTD 0.033 DEPT. 8909.500 NPHI.CNTD -999.250 CFTC. CNTD -999.250 CNTC. CNTD -999.250 GRCH. CNTD 27.858 TENS. CNTD -999.250 CCL.CNTD -999.250 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .001 SERVICE : FLIC VERSION : O01CO1 DATE : 98/09/30 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : LIS Tape Verification Listing Schlumberger Alaska Computing Center 30-SEP-1998 15:50 PAGE: **** FILE HEADER **** FILE NAIKE : EDIT .002 SERVICE : FLIC VERSION : O01CO1 DATE : 98/09/30 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER: 2 EDITED CURVES Depth shifted and clipped curves for each pass in separate files. PASS NUMBER: 2 DEPTH INCR~ENT : O . 5000 FILE SUMFLARY LDWG TOOL CODE START DEPTH STOP DEPTH GRCH 9556.0 8920.5 CNTD 9569.0 8919.5 $ CURVE SHIFT DATA - PASS TO PASS (MEASURED DEPTH) BASELINE CURVE FOR SHIFTS LDWG CURVE CODE: GRCH PASS NUMBER: 1 BASELINE DEPTH 88888.0 9562.0 9559.5 9554.5 9551.5 9549.5 9548.0 9544.0 9537.0 9535.0 9529.0 9527.5 9524.0 9521.0 9519.0 9517.5 9513.5 9513.0 9510.0 9508.0 9505.0 .......... EQUIVALENT UNSHIFTED DEPTH .......... GRCH CNTD 88888.0 88888.0 9551.5 9546.0 9533.5 9525.0 9519.5 9516.5 9512.0 9509.5 9505.5 9503.0 9562.0 9558.5 9554.0 9548.0 9543.5 9536.0 9527.5 9522.5 9515.5 9512.0 LIS Tape Verification Listing Schlumberger Alaska Computing Center 30-SEP-1998 15:50 PAGE: 9504.0 9499.0 9496.5 9494.5 9482.5 9478.0 9475.0 9465.5 9457.0 9456.5 9454.5 9447.0 9436.5 9431.0 9427.0 9420.0 9419.5 9417.0 9407.0 9404.5 9399.5 9397.5 9394.0 9388.5 9386.5 9380.5 9380.0 9372.0 9370.0 9368.0 9367.5 9359.0 9344 5 9340 5 9333 5 9332 5 9325 0 9318 5 9309.0 9301.0 9294.0 9287.0 9284.5 9280.5 9279.5 9265.0 9258.5 9254.0 9249.5 9242.5 9239.5 9236.5 9232.0 9228.0 9226.0 9493.5 9473.5 9454.0 9436.5 9429.5 9418.5 9416.0 9405.0 9396.5 9394.5 9386.0 9379.5 9370.5 9367.0 9333.0 9325.5 9318.5 9301.0 9285.5 9279.0 9258.0 9250.5 9241.5 9231.0 9225.5 9502.5 9497.5 9496.0 9481.5 9475.0 9465.0 9455.5 9453.5 9445.5 9425.5 9418.5 9405.0 9400.0 9387.0 9380.0 9370.5 9367.0 9357.0 9344.0 9339.5 9332.5 9318.5 9309.0 9300.5 9293.5 9285.5 9281.0 92 63.5 9258.5 9255.5 9243.5 9235.5 9227.5 LIS Tape Verification Listing Schlumberger Alaska Computing Center 30-SEP-1998 15:50 PAGE: 9225.5 9225.5 9220.0 9220.5 9217.5 9217.5 9213.5 9213.0 9211.0 9211.5 9199.0 9198.5 9196.0 9196.0 9192.0 9191.5 9191.0 9191.5 9186.0 9187.0 9185.0 9184.5 9182.5 9183.0 9179.5 9178.5 9171.5 9171.5 9171.0 9170.5 9168.0 9168.0 9164 . 0 9163 . 5 9159.0 9158.5 9160.5 9154.5 9154.5 9151.0 9150.5 9150.0 9150.5 9147.5 9146.0 9144.0 9144.0 9143.0 9142.0 9140.5 9140.0 9138.0 9136.5 9136.0 9135.0 9134.5 9133.5 9131.5 9130.5 9119.0 9118.0 9115.0 9114.0 9113.5 9113.0 9110.0 9108.5 9108.0 9107.0 9104.0 9102.5 9100.0 9098.5 9099.5 9098.0 9096.0 9094.0 9094.5 9092.0 9093.0 9091.5 9090.0 9089.0 9089.5 9086.5 9084.0 9082.5 9082.0 9081.0 9080.0 9080.5 9079.0 9078.0 9073.0 9071.5 9072.5 9072.0 9070.5 9069.5 9066.0 9065.5 9065.5 9064.0 9057.0 9056.0 9054.0 9053.5 9052.0 9051.5 9049.0 9048.5 LIS Tape Verification Listing Schlumberger Alaska Computing Center 30-SEP-1998 15:50 PAGE: 10 9047.5 9049.0 9046.0 9046.5 9044.0 9044.5 9037.5 9036.5 9029.0 9028.0 9028.0 9025.5 9026.0 9024.0 9024.0 9021.5 9022.0 9020.0 9019.5 9012.0 9012.0 9011.0 9012.0 9005.0 9007.0 9000.5 9002.5 8989.5 8989.5 8985.0 8985.5 8983.0 8984.0 8978.5 8980.5 8975.5 8976.0 8973.0 8973.5 8966.0 8965.0 8955.5 8956.0 8949.5 8949.0 8946.5 8946.0 8946.0 8947.5 8941.5 8941.5 8936.0 8936.5 8934.0 8934.5 8932.5 8934.5 8927.5 8928.0 8923.5 8923.0 100.0 100.5 99.5 REMARKS: THIS FILE CONTAINS CASED HOLE CNTD PASS #2. THE DEPTH SHIFTS SHOWN ABOVE REFLECT CORRELATIONS BETWEEN GRCH PASS #2 AND GRCH PASS #1, ALSO NPHI PASS #2 AND NPHI PASS #1, CARRYING ALL CNTD CURVES WITH THE NPHI SHIFTS. $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB * * TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 28 4 66 1 5 66 LIS Tape Verification Listing Schlumberger Alaska Computing Center 30-SEP-1998 15:50 PAGE: 11 TYPE REPR CODE VALUE 6 73 7 65 8 68 0.5 9 65 FT 11 66 36 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 1244176 O0 000 O0 0 2 1 1 4 68 0000000000 NPHI CNTD PU-S 1244176 O0 000 O0 0 2 1 1 4 68 0000000000 CFTC CNTD CPS 1244176 O0 000 O0 0 2 1 1 4 68 0000000000 CNTC CNTD CPS 1244176 O0 000 O0 0 2 1 1 4 68 0000000000 GRCH CNTD GAPI 1244176 O0 000 O0 0 2 1 1 4 68 0000000000 TENS CNTD LB 1244176 O0 000 O0 0 2 1 1 4 68 0000000000 CCL CNTD V 1244176 O0 000 O0 0 2 1 1 4 68 0000000000 ** DATA ** DEPT. 9569.000 NPHI. CNTD 27.050 CFTC. CNTD 522.321 CNTC. CNTD 2683.165 GRCH. CNTD -999.250 TENS. CNTD 1384.746 CCL. CNTD 0.022 DEPT. 8919.500 NPHI.CNTD 49.040 CFTC. CNTD 209.241 CNTC. CNTD 1563.773 GRCH. CNTD -999.250 TENS. CNTD 1345.482 CCL.CNTD 0.013 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .002 SERVICE : FLIC VERSION : O01CO1 DATE : 98/09/30 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : LIS Tape Verification Listing Schlumberger Alaska Computing Center 30-SEP-1998 15:50 PAGE: 12 **** FILE HEADER **** FILE NAME : EDIT .003 SERVICE : FLIC VERSION : O01CO1 DATE : 98/09/30 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER: 3 EDITED CURVES Depth shifted and clipped curves for each pass in separate files. PASS NUMBER: 3 DEPTH INCREMENT: O. 5000 FILE SUmmARY LDWG TOOL CODE START DEPTH STOP DEPTH GRCH 9561.5 891 O . 5 CNTD 9573.5 8910.5 $ CURVE SHIFT DATA - PASS TO PASS (MEASURED DEPTH) BASELINE CURVE FOR SHIFTS LDWG CURVE CODE: GRCH PASS NUMBER: 1 BASELINE DEPTH 88888.0 9558.5 9558.0 9555.0 9548.0 9545.0 9538.0 9535.5 9529.0 9524.5 9524.0 9521.0 9520.0 9518.5 9517.5 9515.5 9513.5 9510.5 9509.0 9508.0 9505.5 .......... EQUIVALENT UNSHIFTED DEPTH GRCH CNTD 88887.5 88886.5 9557.0 9557.5 9553.5 9554.0 9546.0 9543.5 9536.0 9533.0 9527.5 9522.5 9521.5 9519.5 9518.0 9516.5 9515.5 9514.0 9512.0 9509.5 9507.0 9505.5 9503.0 LIS Tape Verification Listing Schlumberger Alaska Computing Center 30-SEP-1998 15:50 PAGE: 13 9505.0 9499.5 9499.0 9494.5 9483.0 9480.5 9477.5 9472.5 9466.0 9459.5 9447.0 9442.0 9437.0 9432.5 9426.5 9420.5 9420.0 9410.0 9407.0 9399.5 9397.0 9396.5 9390.5 9380.5 9379.5 9378.0 9376.0 9375.0 9371.5 9370.5 9368.0 9366.0 9360.0 9341 5 9336 5 9334 0 9333 5 9319 0 9315 0 9311 0 9309.0 9302.0 9301.0 9292.5 9288.0 9285.0 9281.5 9280.0 9274.0 9269.5 9266.5 9265.5 9260.0 9259.0 9257.0 9498.0 9493.0 9481.0 9471.0 9457.5 9435.0 9429.5 9418.5 9405.0 9396.0 9395.0 9389.0 9379.5 9377.0 9374.5 9373.5 9370.5 9367.0 9335.0 9333.5 9318.5 9316.0 9312.5 9300.5 9290.5 9279.0 9268.0 9266.0 9258.5 9256.0 9502.5 9497.5 9479.0 9475.0 9464.5 9445.0 9440.0 9425.5 9418.5 9408.5 9397.0 9380.0 9370.5 9365.0 9360.5 9339.5 9333.0 9319.0 9308.5 9300.5 9288.5 9285.5 9281.5 9273.0 9263.5 9260.0 LIS Tape Verification Listing Schlumberger Alaska Computing Center 30-SEP-1998 15:50 PAGE: 14 9252.0 9247.0 9243.0 923 7.5 923 6.0 9228.5 9226.0 9218.0 9212.0 9211.5 9208.5 9205.5 9199.0 9195.5 9194.5 9191.5 9189.0 9185.5 9170.5 9167.5 9165.5 9164.5 9162.5 9160.0 9154.5 9150.5 9148.0 9144.5 9140.5 9138.0 9136.5 9131.5 9128.5 9124.0 9119.5 9119.0 9115 5 9114 0 9108 5 9105 5 9104 0 9100 5 9099.5 9095.0 9093.5 9090.0 9088.5 9086.5 9084.0 9081.5 9080.0 9079.0 9075.0 9073.5 9073.0 9250.5 9241.5 923 6.5 9227.5 9225.5 9217.5 9211.5 9208.5 9204.0 9198.5 9194.0 9184.5 9165.0 9163.5 9162.0 9154.5 9150.5 9146.0 9144.0 9140.0 9136.5 9130.5 9122.5 9118.0 9113.0 9107.5 9102.5 9098.0 9092.0 9089.0 9087.0 9084.0 9082.5 9081.0 9078.0 9074.0 9071.5 9248.0 9235.5 9225.5 9211.5 9196.0 9191.5 9189.5 9170.5 9167.5 9161.0 9150.5 9135.0 9130.5 9128.0 9118.5 9114.5 9104.5 9099.0 9092.0 9080.5 9071.5 LIS Tape Verification Listing Schlumberger Alaska Computing Center 30-SEP-1998 15:50 PAGE: 15 9071.0 9066.5 9064.5 9063.5 9060.0 9058.5 9057.0 9054.5 9053.0 9052.0 9049.5 9048.0 9044.5 9044.0 9040.0 9034.5 9032 5 9029 5 9028 5 9023 0 9020 0 9019 0 9012 5 9012.0 9000.0 8991.5 8981.0 8974.5 8964.0 8954.5 8950.5 8947.0 8942.0 8940.5 8934.0 8925.0 8919.0 8916.0 100.0 9064.0 9061.0 9058.5 9056.5 9054.0 9052.0 9049.0 9043.5 9038.5 9033.5 9031.0 9028.0 9023.5 9019.5 9012.0 9002.5 8992.0 8980.5 8973.5 8962.5 8949.5 8946.0 8941.5 8934.5 8925.5 8919.0 8916.5 100.5 9070.0 9066.0 9057.5 9051.5 9049.0 9043.5 9028.5 9019.0 9013.5 8956.5 8941.0 100.5 REMARKS: THIS FILE CONTAINS CASED HOLE CNTD PASS #3. THE DEPTH SHIFTS SHOWN ABOVE REFLECT CORRELATIONS BETWEEN GRCH PASS #3 AND GRCH PASS #1, ALSO NPHI PASS #3 AND NPHI PASS #1, CARRYING ALL CNTD CURVES WITH THE NPHI SHIFTS. $ LIS FORMAT DATA LIS Tape Verification Listing Schlumberger Alaska Computing Center 30-SEP-1998 15:50 PAGE: 16 ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 28 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 36 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 1244176 O0 000 O0 0 3 1 1 4 68 0000000000 NPHI CNTD PU-S 1244176 O0 000 O0 0 3 1 1 4 68 0000000000 CFTC CNTD CPS 1244176 O0 000 O0 0 3 1 1 4 68 0000000000 CNTC CNTD CPS 1244176 O0 000 O0 0 3 i 1 4 68 0000000000 GRCH CNTD GAPI 1244176 O0 000 O0 0 3 1 1 4 68 0000000000 TENS CNTD LB 1244176 O0 000 O0 0 3 1 1 4 68 0000000000 CCL CNTD V 1244176 O0 000 O0 0 3 1 1 4 68 0000000000 ** DATA ** DEPT. 9573.500 NPHI. CNTD 27.160 CFTC. CNTD 507.220 CNTC. CNTD 2612.988 GRCH. CNTD -999.250 TENS. CNTD 1401.773 CCL. CNTD 0.024 DEPT. GRCH. CNTD 8910.500 NPHI. CNTD 46.760 CFTC. CNTD 217.338 CNTC. CNTD 1632.854 28.028 TENS. CNTD 1333.990 CCL. CNTD 0.049 ** END OF DATA ** LIS Tape Verification Listing Schlumberger Alaska Computing Center 30-SEP-1998 15:50 PAGE: 17 **** FILE TRAILER **** FILE NA~E : EDIT .003 SERVICE : FLIC VERSION : O01CO1 DATE : 98/09/30 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .004 SERVICE : FLIC VERSION : O01CO1 DATE : 98/09/30 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER: 4 AVERAGED CURVES Compensated Neutron: Arithmetic average of edited passes for all curves. DEPTH INCREMENT 0.5000 PASSES INCLUDED IN AVERAGE LDWG TOOL CODE PASS NUMBERS 1, 2, 3, CNTD REMARKS: THIS FILE CONTAINS THE ARITHMETIC AVERAGE OF PASSES 1,2, &3. THE DATA WAS CLIPPED AND DEPTH SHIFTED BEFORE THE AVERAGE WAS CALCULATED. $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 24 4 66 1 $ 66 6 73 LIS Tape Verification Listing Schlumberger Alaska Computing Center 30-SEP-1998 15:50 PAGE: 18 TYPE REPR CODE VALUE 7 65 8 68 0.5 9 65 FT 11 66 42 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELE~ CODE (HEX) DEPT FT 1244176 O0 000 O0 0 4 1 1 4 68 0000000000 NPHI CNAV PU-S 1244176 O0 000 O0 0 4 1 1 4 68 0000000000 CFTC CNAV CPS 1244176 O0 000 O0 0 4 1 1 4 68 0000000000 CNTC CNAV CPS 1244176 O0 000 O0 0 4 1 1 4 68 0000000000 GRCH CNTD GAPI 1244176 O0 000 O0 0 4 1 1 4 68 0000000000 TENS CNTD LB 1244176 O0 000 O0 0 4 1 1 4 68 0000000000 ** DATA ** DEPT. 9576.500 NPHI.CNAV -999.250 CFTC. CNAV -999.250 CNTC. CNAV -999.250 GRCH. CNTD -999.250 TENS. CNTD 1380.088 DEPT. 8909.500 NPHI.CNAV -999.250 CFTC. CNAV -999.250 CNTC. CNAV -999.250 GRCH. CNTD 27.858 TENS. CNTD -999.250 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .004 SERVICE : FLIC VERSION : O01CO1 DATE : 98/09/30 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : LIS Tape Verification Listing Schlumberger Alaska Computing Center 30-SEP-1998 15:50 PAGE: 19 **** FILE HEADER **** FILE NAME : EDIT .005 SERVICE : FLIC VERSION · O01CO1 DATE : 98/09/30 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE NUMBER 5 RAW CURVES Curves and log header data for each pass in separate files; raw background pass in last file PASS NUMBER: 1 DEPTH INCREMENT: 0.5000 FILE SUM~L~Y VENDOR TOOL CODE START DEPTH CNTD 9596.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE VERSION: TIME LOGGER ON BOTTOM: TD DRILLER (FT) : TD LOGGER (FT) : TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT) : LOGGING SPEED (FPHR): DEPTH CONTROL USED (YES/NO): STOP DEPTH .......... 8904.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE GR GAMMA RAY CNTD COMPENSATED NEUTRON $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLERS CASING DEPTH (FT) : LOGGERS CASING DEPTH (FT) : BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE T~.MPERATURE (DEGF) : BOTTOM HOLE TEMPERATURE (DEGF) : FLUID SALINITY (PPM) : FLUID LEVEL (FT) : 08-MAR-98 8B1-129 1409 08-MAR-98 9589.0 9594.0 8910.0 9578.0 TOOL NUMBER CGRS-A CNT-D 8.500 9784.0 PRODUCED FLUIDS LIS Tape Verification Listing Schlumberger Alaska Computing Center 30-SEP-1998 15:50 PAGE: 2O FLUID RATE AT WELLHEAD (BPM): WATER CUTS (PCT) : GAS~OIL RATIO: CHOKE (DEG) : NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): THERMAL SANDSTONE 2.65 BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE TOP NORMALIZING WINDOW (FT) : BASE NORMALIZING WINDOW (FT): BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (CPS): 0 FAR COUNT RATE HIGH SCALE (CPS): 4000 NEAR COUNT RATE LOW SCALE (CPS): 0 NEAR COUNT RATE HIGH SCALE (CPS): 20000 TOOL STANDOFF (IN): REMARKS: Tied into SWS BHC Sonic log dated 24-Feb-1986. Pumped 140 BBL seawater into well prior to logging GOC appears to be at 9478 feet measured depth THIS FILE CONTAINS THE RAW CURVES DISPLAYED ON THE BLUELINE FOR PASS #1. $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 28 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 36 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 LIS Tape Verification Listing Schlumberger Alaska Computing Center 30-SEP-1998 15:50 PAGE: 21 TYPE REPR CODE VALUE 0 66 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 1244176 O0 000 O0 0 5 1 1 4 68 0000000000 NPHI PS1 PU 1244176 O0 000 O0 0 5 1 1 4 68 0000000000 CNTC PS1 CPS 1244176 O0 000 O0 0 5 1 1 4 68 0000000000 CFTC PS1 CPS 1244176 O0 000 O0 0 5 1 1 4 68 0000000000 GR PSi GAPI 1244176 O0 000 O0 0 5 1 1 4 68 0000000000 TENS PS1 LB 1244176 O0 000 O0 0 5 1 1 4 68 0000000000 CCLD PS1 V 1244176 O0 000 O0 0 5 1 1 4 68 0000000000 ** DATA ** DEPT. GR.PS1 DEPT. GR.PS1 9596.000 NPHI.PS1 6.180 CNTC. PS1 1787.446 CFTC. PSi 54.074 TENS.PSI 1226.576 CCLD.PS1 0.027 8904.000 NPHI.PS1 46.500 CNTC. PS1 1562.153 CFTC. PSI 25.890 TENS.PSI 1358.244 CCLD.PS1 -0.027 854.103 214. 736 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .005 SERVICE : FLIC VERSION : O01CO1 DATE · 98/09/30 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .006 SERVICE : FLIC VERSION : O01CO1 DATE : 98/09/30 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : LIS Tape Verification Listing Schlumberger Alaska Computing Center 30-SEP-1998 15:50 PAGE: 22 FILE HEADER FILE NUMBER 6 RAW CURVES Curves and log header data for each pass in separate files; raw background pass in last file PASS NUMBER: 2 DEPTH INCREMENT: O. 5000 FILE SUFk~ARY VENDOR TOOL CODE START DEPTH CNTD 9586.0 $ LOG HEADER DATA STOP DEPTH .......... 8914.0 DATE LOGGED: SOFTWARE VERSION: TIME LOGGER ON BOTTOM: TD DRILLER (FT) : TD LOGGER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : LOGGING SPEED (FPHR) : DEPTH CONTROL USED (YES/NO): TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE GR GAMgIA RAY CNTD COMPENSATED NEUTRON $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLERS CASING DEPTH (FT) : LOGGERS CASING DEPTH (FT): BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE TEMPERATURE (DEGF) : BOTTOM HOLE TEMPERATURE (DEGF) : FLUID SALINITY (PPM) : FLUID LEVEL (FT) : FLUID RATE AT WELLHEAD (BPM) : WATER CUTS (PCT) : GAS~OIL RATIO: CHOKE (DEG) : NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE 08-MAR-98 8B1-129 1409 08-MAR-98 9589.0 9594.0 8910.0 9578.0 TOOL NUMBER CGRS-A CNT- D 8.500 9784.0 PRODUCED FLUIDS THERMAL SANDSTONE 2.65 LIS Tape Verification Listing Schlumberger Alaska Computing Center 30-SEP-1998 15:50 PAGE: 23 TOP NORMALIZING WINDOW (FT): BASE NORMALIZING WINDOW (FT) : BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (CPS): 0 FAR COUNT RATE HIGH SCALE (CPS): 4000 NEAR COUNT RATE LOW SCALE (CPS): 0 NEAR COUNT RATE HIGH SCALE (CPS): 20000 TOOL STANDOFF (IN): REMARKS: Tied into SWS BHC Sonic log dated 24-Feb-1986. Pumped 140 BBL seawater into well prior to logging GOC appears to be at 9478 feet measured depth THIS FILE CONTAINS THE RAW CURVES DISPLAYED ON THE BLUELINE FOR PASS #2. $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 28 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 36 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 1244176 O0 000 O0 0 6 1 1 4 68 0000000000 NPHI PS2 PU 1244176 O0 000 O0 0 6 1 1 4 68 0000000000 CNTC PS2 CPS 1244176 O0 000 O0 0 6 1 1 4 68 0000000000 CFTC PS2 CPS 1244176 O0 000 O0 0 6 1 1 4 68 0000000000 LIS Tape Verification Listing Schlumberger Alaska Computing Center 30-SEP-i998 15:50 PAGE: 24 NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) GR PS2 GAPI 1244176 O0 000 O0 0 6 1 1 4 68 0000000000 TENS PS2 LB 1244176 O0 000 O0 0 6 1 1 4 68 0000000000 CCLDPS2 V 1244176 O0 000 O0 0 6 1 1 4 68 0000000000 ** DATA ** DEPT. 9586.000 NPHI.PS2 21.950 CNTC. PS2 3482.804 GR.PS2 0.194 TENS.PS2 1367.738 CCLD. PS2 0.027 DEPT. 8914.000 NPHI.PS2 43.660 CNTC. PS2 1549.562 GR.PS2 34.880 TENS.PS2 1359.069 CCLD.PS2 0.325 CFTC. PS2 CFTC. PS2 10.745 218. 962 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .006 SERVICE : FLIC VERSION : O01CO1 DATE : 98/09/30 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** FILE HEADER **** FILE NAME : EDIT .007 SERVICE : FLIC VERSION · O01CO1 DATE · 98/09/30 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : FILE HEADER FILE ArUMBER 7 RAW CURVES Curves and log header data for each pass in separate files; raw background pass in last file PASS NUMBER: 3 DEPTH INCREMENT: 0.5000 FILE SUFk4ARY VENDOR TOOL CODE START DEPTH STOP DEPTH LIS Tape Verification Listing Schlumberger Alaska Computing Center 30-SEP-1998 15:50 PAGE: 25 CNTD LOG HEADER DATA 9594.0 DATE LOGGED: SOFTWARE VERSION: TIME LOGGER ON BOTTOM: TD DRILLER (FT) : TD LOGGER (FT) : TOP LOG INTERVAL (FT) : BOTTOM LOG INTERVAL (FT) : LOGGING SPEED (FPHR) : DEPTH CONTROL USED (YES/NO): 8906.0 TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE GR GAMMA RAY CNTD COMPENSATED NEUTRON $ BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): DRILLERS CASING DEPTH (FT) : LOGGERS CASING DEPTH (FT) : BOREHOLE CONDITIONS FLUID TYPE: FLUID DENSITY (LB/G): SURFACE TEMPERATURE (DEGF) : BOTTOM HOLE TEMPERATURE (DEGF) : FLUID SALINITY (PPM) : FLUID LEVEL (FT) : FLUID RATE AT WELLHEAD (BPM) : WATER CUTS (PCT) : GAS~OIL RATIO: CHOKE (DEG) : NEUTRON TOOL TOOL TYPE (EPITHERMAL OR THERMAL): MATRIX: MATRIX DENSITY: HOLE CORRECTION (IN): BLUELINE COUNT RATE NORMALIZATION IN OIL ZONE TOP NORMALIZING WINDOW (FT) : BASE NORMALIZING WINDOW (FT) : BLUELINE COUNT RATE SCALES SET BY FIELD ENGINEER FAR COUNT RATE LOW SCALE (CPS): 0 FAR COUNT RATE HIGH SCALE (CPS): 4000 NEAR COUNT RATE LOW SCALE (CPS): 0 NEAR COUNT RATE HIGH SCALE (CPS): 20000 TOOL STANDOFF (IN): 08oMAR-98 8B1-129 1409 08-MAR-98 9589.0 9594.0 8910.0 9578.0 TOOL NUMBER CGRS-A CNT-D 8.500 9784.0 PRODUCED FLUIDS THERMAL SANDSTONE 2.65 LIS Tape Verification Listing Schlumberger Alaska Computing Center 30-SEP-1998 15:50 PAGE: 26 REMARKS: Tied into SWS BHC Sonic log dated 24-Feb-1986. Pumped 140 BBL seawater into well prior to logging GOC appears to be at 9478 feet measured depth THIS FILE CONTAINS THE RAW CURVES DISPLAYED ON THE BLUELINE FOR PASS #3. $ LIS FORMAT DATA ** DATA FORMAT SPECIFICATION RECORD ** ** SET TYPE - 64EB ** TYPE REPR CODE VALUE 1 66 0 2 66 0 3 73 28 4 66 1 5 66 6 73 7 65 8 68 0.5 9 65 FT 11 66 36 12 68 13 66 0 14 65 FT 15 66 68 16 66 1 0 66 1 ** SET TYPE - CHAN ** NAME SERV UNIT SERVICE API API API API FILE NUMB NUMB SIZE REPR PROCESS ID ORDER # LOG TYPE CLASS MOD NUMB SAMP ELEM CODE (HEX) DEPT FT 1244176 O0 000 O0 0 7 1 1 4 68 0000000000 NPHI PS3 PU 1244176 O0 000 O0 0 7 1 1 4 68 0000000000 CNTC PS3 CPS 1244176 O0 000 O0 0 7 1 1 4 68 0000000000 CFTC PS3 CPS 1244176 O0 000 O0 0 7 1 1 4 68 0000000000 GR PS3 GAPI 1244176 O0 000 O0 0 7 1 1 4 68 0000000000 TENS PS3 LB 1244176 O0 000 O0 0 7 1 1 4 68 0000000000 CCLD PS3 V 1244176 O0 000 O0 0 7 1 1 4 68 0000000000 ** DATA ** LIS Tape Verification Listing Schlumberger Alaska Computing Center 30-SEP-1998 15:50 PAGE: 27 DEPT. 9594.000 NPHI.PS3 GR.PS3 0.139 TENS.PS3 DEPT. 8906.000 NPHI.PS3 GR.PS3 31.616 TENS.PS3 6.230 CNTC. PS3 1080.316' CCLD.PS3 44.760 CNTC. PS3 1329.314 CCLD.PS3 1761.421 0.026 1512.973 0.032 CFTC. PS3 CFTC. PS3 855.072 234.817 ** END OF DATA ** **** FILE TRAILER **** FILE NAME : EDIT .007 SERVICE : FLIC VERSION : O01CO1 DATE : 98/09/30 MAX REC SIZE : 1024 FILE TYPE : LO LAST FILE : **** TAPE TRAILER **** SERVICE NAME : EDIT DATE : 98/09/30 ORIGIN : FLIC TAPE NAME : 98491 CONTINUATION # .. 1 PREVIOUS TAPE : COMMENT : BP EXPLORATION, PRUDHOE BAY, D-27, API #50-029-21543-00 * * * * REEL TRAILER * * * * SERVICE NAME : EDIT DATE : 98/09/30 ORIGIN : FLIC REEL NAME : 98491 CONTINUATION # : PREVIOUS REEL : COGENT : BP EXPLORATION, PRUDHOE BAY, D-27, API #50-029-21543-00 Tape Subfile 1 is type: BIT BP EXPLORATION (ALASKA), INC. D - 27 SERVICE TABLE ***X 228D*** DATE LOGGED NOV 11 90 TIME LOGGED 14:02:30 HEADER STARTING DEPTH 9666.000 RECEIVED NOV 2 1990 Alaska 0il & Gas Cons, 0ommission F~O~BEL LEVEL SPACING SAMPLES/RECORD HEADER ENDING DEPTH # 3 0.25000 32.0 -3.000 at 9666 Feet LSN =0.00000 CLSN=0.00000 SSN = 50.000 CSSN= 50.000 GR =0.00000 CCL = 450.00 TTEN=0.00000 TEN =-200.00 SPD =0.00000 CN =0.00000 CNC =0.00000 CNRA=0.00000 at 9650 Feet LSN = 47.475 CLSN= 11.869 SSN = 163.34 CSSN= 163.34 GR = 54.364 CCL =0.00000 TTEN= 1036.7 TEN = 199.55 SPD = 25.997 CN = 30.816 CNC = 31.921 CNRA=0.07266 at 9600 Feet LSN = 58.324 CLSN= 14.581 SSN = 194.85 CSSN= 194.85 GR = 20.492 CCL =0.00000 TTEN= 1045.8 TEN = 44.008 SPD = 29.997 CN = 29.490 CNC = 30.649 CNRA=0.07483 at 9550 Feet LSN = 41.400 CLSN= 10.350 SSN = 144.62 CSSN= 144.62 GR = 30.413 CCL =0.00000 TTEN= 1089.5 TEN = 37.336 SPD = 29.997 CN = 31.527 CNC = 32.605 CNRA=0.07157 at 9500 Feet LSN = 50,961 CLSN= 12.740 SSN = ],73.44 CSSN= 173.44 GR = 73.683 CCL =0;00000 TTEN= !009.2, TEN =-39.270 SPD = 29.997 CN = 30.318 CNC = 31.443 CNRA=0.07346 at 9450 Feet LSN = 87.431 CLSN= 21.858 SSN = 221.87 CSSN= 221.87 GR = 16.371 'CCL =0.00000 TTEN= 997.33 TEN =-30.972 SPD = 29.997 CN = 19.387 CNC = 21.090 CNRA=0.09852 at 9400 Feet LSN = 110.85 CLSN= 27.712 SSN = 241.37 CSSN= 241.37 GR = 19.722 CCL =0.00000 TTEN= 989.50 TEN =-23.448 SPD = 29.997 CN = 14.979 CNC = 16.994 CNRA=0.11481 at 9350 Feet LSN = 123.28 CLSN= 30.820 SSN = 277.57 CSSN= 277.57 GR = 17.694 CCL =0.00000 TTEN= 1005.0 TEN =-22.202 SPD = 29.997 CN = 15.882 CNC = 17.830 CNRA=0.11104 at 9300 Feet LSN = 86.864 CLSN= 21.716 SSN = 230.95 CSSN= 230.95 GR = 18.740 CCL =0.00000 TTEN= 971.51 TEN =-30.225 SPD = 30.997 CN = 20.876 CNC = 22.484 CNRA=0.09403 at 9250 Feet LSN = 98.025 CLSN= 24.506 SSN = 234.68 CSSN= 234.68 GR = 19.834 CCL =0.00000 TTEN= 977.33 TEN =-23.440 SPD = 30.997 CN = 17.626 CNC = 19.448 CNRA=0.10443 at 9200 Feet LSN = 87.140 CLSN= 21.785 SSN = 233.08 CSSN= 233.08 GR = 34.364 CCL =0.00000 TTEN= 983.16 TEN =-17.689 SPD = 30.997 CN = 21.074 CNC = 22.670 CNRA=0.09346 at 9150 Feet ~LSN = 128.38 CLSN= 32.095 SSN = 267.67 CSSN= 267.67 GR = 24.722 CCL = 1.0000 TTEN= 968.06 TEN =-23.951 SPD = 30.997 CN = 13.852 CNC = 15.954 CNRA=0.11990 at 9100 Feet LSN = 157.03 CLSN= 39.259 SSN = 297.69 CSSN= 297.69 GR = 66.363 CCL =0.00000 TTEN= 973.89 TEN =-17.985 SPD = 30.997 CN = 11.556 CNC = 13.845 CNRA=0.13188 at 9050 Feet LSN = 63.411 CLSN= 15.853 SSN = 177.96 CSSN= 177.96 GR = 158.15 CCL = 24.000 TTEN= 974.15 TEN =-17.157 SPD = 30.597 CN = 22.701 CNC = 24.200 CNRA=0.08908 at 9000 Feet LSN = 22.932 CLSN= 5.7329 SSN = 118.32 CSSN= 118.32 GR = 60.680 CCL = 123.00 TTEN= 947.18 TEN =-34.939 SPD = 30.991 CN = 64.302 CNC = 65.411 CNRA=0.04845 at 8950 Feet LSN = 20.042 CLSN= 5.0105 SSN = 117.09 CSSN= 117.09 GR = 37.930 CCL =0.00000 TTEN= 939.15 TEN =-21.786 SPD = 30.997 CN = 89.892 CNC = 92.771 CNRA=0.04279 at 8900 Feet LSN = 21.022 CLSN= 5.2555 SSN = 118.29 CSSN= 118.29 GR = 48.749 CCL =0.00000 TTEN= 938.62 TEN =-24.333 SPD = 30.997 CN = 80.622 CNC = 82.684 CNRA=0.04443 at 8882.25 Feet LSN =0.00000 CLSN=0.00000 SSN = 50.000 CSSN= 50.000 GR =0.00000 CCL = 450.00 TTEN=0.00000 TEN =-200.00 SPD =0.00000 CN =0.00000 CNC =0.00000 CNRA=0~00000. Tape File Start Depth = 9666.000000 Tape File End Depth = 8882.250000 Tape File Level Spacing = 0.250000 Tape File Depth Units = Feet RECEIVED NOV 2 g 1990 Alaska Oil & 6~s Cons. Commission Tape Subfile 2 is type: BIT BP EXPLORATION (ALASKA), INC. D - 27 SERVICE TABLE ***X 228D*** DATE LOGGED NOV 11 90 TIME LOGGED 14:35:20 HEADER STARTING DEPTH 9678.000 FILE LABEL LEVEL SPACING SAMPLES/RECORD HEADER ENDING DEPTH # 4 0.25000 32.0 3.000 at 9678 Feet LSN =0.00000 CLSN=0.00000 SSN = 50.000 CSSN= 50.000 GR =0.00000 CCL = 450.00 TTEN=0.00000 TEN =-200.00 SPD =0.00000 CN =0.00000 CNC =0.00000 CNRA=0.00000 at 9650 Feet LSN = 45.819 CLSN= 11.455 SSN = 167.53 CSSN= 167.53 GR = 49.020 CCL =0.00000 TTEN= 1030.2 TEN = 197.91 SPD = 29.997 CN = 33.793 CNC = 34.792 CNRA=0.06837 at 9600 Feet LSN = 57.506 CLSN= 14.377 SSN = 196.70 CSSN= 196.70 GR = 17.350 CCL =0.00000 TTEN= 1035.3 TEN = 46.074 SPD = 29.997 CN = 30.546 CNC = 31.662 CNRA=0.07309 at 9550 Feet LSN = 42.028 CLSN= 10.507 SSN = 149.97 CSSN= 149.97 GR = 25.924 CCL =0.00000 TTEN= 1073.8 TEN = 34.750 SPD = 28.997 CN = 32.557 CNC = 33.598 CNRA=0.07006 at 9500 Feet LSN = 52.787 CLSN= 13.197 SSN = 180.00 CSSN= 180.00 GR = 69.189 CCL = 3,0000 TTEN= 997-~32 TEN =-35.522 SPD = 29.997 CN = 30.404 CNC = 31.525 CNRA=O.07332 at 9450 Feet LSN = 87.941 CLSN= 21.985 SSN = 225.71 CSSN= 225.71 GR = 20.525 CCL = 52.000 TTEN= 999.30 TEN =-29.985 SPD = 29.997 CN = 19.742 CNC = 21.422 CNRA=0.09741 at 9400 Feet LSN = 113.01 CLSN= 28.251 SSN = 246.03 CSSN= 246.03 GR = 21.238 CCL = 2.0000 TTEN= 998.94 TEN =-23.336 SPD = 29.997 CN = 14.974 CNC = 16.990 CNRA=0.11483 at 9350 Feet LSN = 130.52 CLSN= 32.630 SSN = 279.61 CSSN= 279.61 GR = 16.280 CCL = 1.0000 TTEN= 988.28 TEN =-22.033 SPD = 29.233 CN = 14.549 CNC = 16.597 CNRA=0.11670 at 9300 Feet LSN = 88.429 CLSN= 22.107 SSN = 234.62 CSSN= 234.62 GR = 18.401 CCL =0.00000 TTEN= 968.95 TEN =-29.311 SPD = 29.997 CN = 20.808 CNC = 22.420 CNRA=0.09423 at 9250 Feet LSN = 101.51 CLSN= 25.379 SSN = 237.31 CSSN= 237.31 GR = 24.278 CCL = 6.0000 TTEN= 978.70 TEN =-21.269 SPD =.29.997 CN = 16.936 CNC = 18.808 CNRA=0.10694 at 9200 Feet LSN = 87.667 CLSN= 21.917 SSN = 236.86 CSSN= 236.86 GR = 33.709 CCL = 4.0000 TTEN= 981.92 TEN =-15.334 SPD = 30.761 CN = 21.407 CNC = 22.983 CNRA=0.09253 at 9150 Feet ~LSN = 128.96 CLSN= 32.240 SSN = 265.81 CSSN= 265.81 GR = 26.534 CCL = 1.0000 TTEN= 984.40 TEN =-14.616 SPD = 29.997 CN = 13.562 CNC = 15.687 CNRA=0.12129 at 9100 Feet LSN = 164.14 CLSN= 41.035 SSN = 297.95 CSSN= 297.95 GR = 68.545 CCL =0.00000 TTEN= 962.52 TEN =-24.553 SPD = 29.997 CN = 10.587 CNC = 12.959 CNRA=0.13773 at 9050 Feet LSN = 67.281 CLSN= 16.820 SSN = 178.54 CSSN= 178.54 GR = 159.75 CCL = 261.00 TTEN= 968.65 TEN =-16.988 SPD = 29.997 CN = 20.814 CNC = 22.425 .CNRA=0.09421 at 9000 Feet LSN = 24.538 CLSN= 6.1346 SSN = 119.88 CSSN= 119.88 GR = 61.189 CCL = 119.00 TTEN= 952.84 TEN =-28.186 SPD = 30.233 CN = 56.723 CNC = 57.602 CNRA=0.05117 at 8950 Feet LSN = 19.522 CLSN= 4.8805 SSN = 116.97 CSSN= 116.97 GR = 43.352 CCL = 179.00 TTEN= 947.83 TEN =-26.341 SPD = 29.997 CN = 97.134 CNC = 100.79 CNRA=0.04172 at 8900 Feet LSN =0.00000 CLSN=0.00000 SSN = 50.000 CSSN= 50.000 GR = 50.010 CCL = 200.00 TTEN=0.00000 TEN =-200.00 SPD =0.00000 CN =0.00000 CNC =0.00000 CNRA=0.00000 at 8894.25 Feet LSN =0.00000 CLSN=0.00000 SSN = 50.000 CSSN= 50.000 GR =0.00000 CCL = 200.00 TTEN=0.00000 TEN =-200.00 SPD =0.00000 CN =0.00000 CNC =0.00000 CNRA=0.00000 Tape File Start Depth ~ 9678.000000 Tape File End Depth = 8894.250000 Tape File Level Spacing = 0.250000 Tape File Depth Units = Feet Tape Subfile 3 is type: BIT BP EXPLORATION (ALASKA), INC. D - 27 SERVICE TABLE ***X 228D*** DATE LOGGED NOV 11 90 TIME LOGGED 15:05:23 HEADER STARTING DEPTH 9676.000 FILE LABEL LEVEL SPACING SAMPLES/RECORD HEADER ENDING DEPTH # 5 0.25000 32.0 1.000 at 9676 Feet LSN =0.00000 CLSN=0.00000 SSN = 50.000 CSSN= 50.000 GR =0.00000 CCL = 200.00 TTEN=0.00000 TEN =-200.00 SPD =0.00000 CN =0.00000 CNC =0.00000 CNRA=0.00000 at 9650 Feet LSN = 47.323 CLSN= 11.831 SSN = 164.22 CSSN= 164.22 GR = 43.582 CCL =0.00000 TTEN= 1027.6 TEN = 286.09 SPD = 29.997 CN = 31.215 CNC = 32.304 CNRA=0.07204 at 9600 Feet LSN = 56.464 CLSN= 14.116 SSN = 194.69 CSSN= 194.69 GR = 20.336 CCL =0.00000 TTEN= 1030.9 TEN = 72.943 SPD = 29.997 CN = 30.917 CNC = 32.018 CNRA=0.07250 at 9550 Feet LSN = 41.678 CLSN= 10.419 SSN = 149.52 CSSN= 149.52 GR = 28.630 CCL =0.00000 TTEN= 1046.3 TEN = 10.942 SPD = 29.997 CN = 32.824 CNC = 33.856 CNRA=0.06969 at 9500 Feet LSN = 56.390 CLSN= 14.097 SSN = 181.93 CSSN= 181.93 GR = 68.577 CCL = !.0000 TTEN= 1002,7 TEN =-30.753 SPD = 29.997 CN = 27.997 CNC = 29.221 CNRA=0.07749 at 9450 Feet LSN = 86.058 CLSN= 21.514 SSN = 229.37 CSSN= 229.37 GR = 17.667 CCL = 35.000 TTEN= 997.29 TEN =-28.643 SPD = 29.997 CN = 20.957 CNC = 22.560 CNRA=0.09380 at 9400 Feet LSN = 115.08 CLSN= 28.771 SSN = 252.81 CSSN= 252.81 GR = 19.970 CCL = 5.0000 TTEN= 985.64 TEN =-28.810 SPD = 29.991 CN = 15.213 CNC = 17.211 CNRA=0.11381 at 9350 Feet LSN = 126.20 CLSN= 31.550 SSN = 282.16 CSSN= 282.16 GR = 17.446 CCL = 4.0000 TTEN= 989.89 TEN =u21.546 SPD = 29.997 CN = 15.691 CNC = 17.653 CNRA=0.11181 at 9300 Feet LSN = 88.073 CLSN= 22.018 SSN = 236.17 CSSN= 236.17 GR = 20.647 CCL = 2.0000 TTEN= 978.48 TEN =-22.341 SPD = 30.997 CN = 21.157 CNC = 22.748 CNRA=0.09323 at 9250 Feet LSN = 95.121 CLSN= 23.780 SSN = 238.79 CSSN= 238.79 GR = 23.782 CCL = 9.0000 TTEN= 978.27 TEN =-23.985 SPD = 30.997 CN = 19.052 CNC = 20.777 CNRA=0.09959 at 9200 Feet LSN = 84.798 CLSN= 21.200 SSN = 236.27 CSSN= 236.27 GR = 32.317 CCL = 1.0000 TTEN= 984.37 TEN =-13.501 SPD = 29.997 CN = 22.451 CNC = 23.964 CNRA=0.08972 at 9150 Feet ~LSN = 118.93 CLSN= 29.733 SSN = 263.64 CSSN= 263.64 GR = 29.734 CCL = 11.000 TTEN= 943.99 TEN =-20.127 SPD = 30.561 CN = 15.457 CNC = 17.437 CNRA=0.11278 at 9100 Feet LSN = 161.74 CLSN= 40.436 SSN = 301.71 CSSN= 301.71 GR = 72.320 CCL =0.00000 TTEN= 965.09 TEN =-17.249 SPD = 30.997 CN = 11.190 CNC = 13.510 CNRA=O.13402 at 9050 Feet LSN = 66.431 CLSN= 16.608 SSN = 178.55 CSSN= 178.55 GR = 153.25 CCL = 63.000 TTEN= 960.27 TEN =-21.363 SPD = 30.991 CN = 21.233 CNC = 22.819 CNRA=0.09302 at 9000 Feet LSN = 24.032 CLSN= 6.0081 SSN = 120.25 CSSN= 120.25 GR = 61.731 CCL = 27.000 TTEN= 946.91 TEN =-32.538 SPD = 30.991 CN = 59.841 CNC = 60.799 CNRA=0.04996 at 8950 Feet LSN = 20.476 CLSN= 5.1190 SSN = 120.29 CSSN= 120.29 GR = 43.328 CCL = 184.00 TTEN= 945.94 TEN =-21.671 SPD = 30.033 CN = 91.414 CNC = 94.447 CNRA=0.04256 at 8900.25 Feet LSN =0.00000 CLSN=0.O0000 SSN = 50.000 CSSN= 50.000 GR =0.00000 CCL = 200.00 TTEN=0.00000 TEN =-200.00 SPD =0.00000 CN =0.00000 CNC =0.00000 CNRA=0.00000 Tape File Start Depth = 9676.000000 Tape File End Depth = 8900.250000 Tape File Level Spacing = 0.250000 Tape File Depth Units = Feet Tape Subfile 4 is type: BIT BP EXPLORATION (ALASKA), INC. D - 27 SERVICE TABLE ***X 228D*** DATE LOGGED NOV 11 90 TIME LOGGED 15:36:03 HEADER STARTING DEPTH 9676.000 FILE LABEL LEVEL SPACING SAMPLES/RECORD HEADER ENDING DEPTH # 6 0.25000 32.0 2.000 at 9676 Feet LSN =0.00000 CLSN=0.00000 SSN = 50.000 CSSN= 50.000 GR =0.00000 CCL = 200.00 TTEN=0.00000 TEN =-200.00 SPD =0.00000 CN =0.00000 CNC =0.00000 CNRA=O.00000 at 9650 Feet LSN = 46.139 CLSN= 11.535 SSN = 164.91 CSSN= 164.91 GR = 42.234 CCL =0.00000 TTEN= 1032.3 TEN = 296.91 SPD = 28.997 CN = 32.639 CNC = 33.677 CNRA=0.06995 at 9600 Feet LSN = 59.801 CLSN= 14.950 SSN = 197.92 CSSN= 197.92 GR = 18.978 CCL = 746.00 TTEN= 1028.0 TEN = 75.070 SPD = 29.997 CN = 29.079 CNC = 30.255 CNRA=O.07554 -at 9550 Feet LSN = 39.593 CLSN= 9.8982 SSN = 152.68 CSSN= 152.68 GR = 26.055 CCL = 1140.0 TTEN= 1063.8 TEN = 34.297 SPD = 29.997 CN = 36.725 CNC = 37.641 CNRA=0.06483 at 9500 Feet LSN = 53.236 CLSN= 13.309 SSN = 184.54 CSSN= 184.54 GR = 75.451 CCL = 59.000 TTEN= 997.61 TEN =-31.094 SPD = 29.342 CN = 31.166 CNC = 32.258 CNRA=O.07212 at 9450 Feet LSN =,91.513 CLSN= 22.878 SSN = 227.23 CSSN= 227.23 GR = 18.444 CCL = 7.0000 TTEN= 993.02 TEN =~31.635 SPD = 29.997 CN = 18.716 CNC = 20.464 CNRA=O.lO068 at 9400 Feet LSN = 115.30 CLSN= 28.825 SSN = 249.82 CSSN= 249.82 GR = 19.950 CCL = 22.000 TTEN= 984.35 TEN =-30.605 SPD = 28.997 CN = 14.848 CNC = 16.873 CNRA=0.11538 at 9350 Feet LSN = 127.35 CLSN= 31.838 SSN = 280.66 CSSN= 280.66 GR = 19.215 CCL =0.00000 TTEN= 979.96 TEN =-24.330 SPD = 28.997 CN = 15.299 CNC = 17.291 CNRA=0.11344 at 9300 Feet LSN = 90.617 CLSN= 22.654 SSN = 240.10 CSSN= 240.10 GR = 19.674 CCL = 2.0000 TTEN= 978.63 'TEN =-19.054 SPD = 30.888 CN = 20.764 CNC = 22.379 CNRA=0.09435 at 9250 Feet LSN = 96.966 CLSN= 24.241 SSN = 240.88 CSSN= 240.88 GR = 24.829 CCL = 11.000 TTEN= 980.89 TEN =-19.630 SPD = 29.997 CN = 18.730 CNC = 20.477 CNRA=0.10064 at 9200 Feet LSN = 91.222 CLSN= 22.806 SSN = 241.26 CSSN= 241.26 GR = 34.586 CCL = 3.0000 TTEN= 979.53 TEN =-14.007 SPD = 30.997 CN = 20.703 CNC = 22.322 CNRA=O.09453 at 9150 Feet ~LSN = 128.47 CLSN= 32.118 SSN = 269.95 CSSN= 269.95 GR = 28.395 CCL =0.00000 TTEN= 970.05 TEN =-21.314 SPD = 29.997 CN = 14.049 CNC = 16.136 CNRA=0.11898 at 9100 Feet LSN = 160.19 CLSN= 40.047 SSN = 304.09 CSSN= 304.09 GR = 73.431 CCL =0.00000 TTEN= 964.38 TEN =-20.233 SPD = 29.997 CN = 11.588 CNC = 13.874 CNRA=0.13169 at 9050 Feet LSN = 67.430 CLSN= 16.858 SSN = 184.44 CSSN= 184.44 GR = 146.86 CCL = 1.0000 TTEN= 959.50 TEN =-21.286 SPD = 29.997 CN = 21.820 CNC = 23.370 CNRA=0.09140 at 9000 Feet LSN = 22.031 CLSN= 5.5076 SSN = 122.23 CSSN= 122.23 GR = 58.018 CCL = 35.000 TTEN= 947.60 TEN =-28.236 SPD = 29.997 CN = 77.514 CNC = 79.347 CNRA=0.04506 at 8950 Feet LSN = 19.471 CLSN= 4.8677 SSN = 118.11 CSSN= 118.11 GR = 44.880 CCL =0.00000 TTEN= 945.82 TEN =-24.401 SPD = 29.997 CN = 100.98 CNC = 105.10 CNRA=0.04121 at 8900.25 Feet LSN =0.00000 CLSN=0.00000 SSN = 50.000 CSSN= 50.000 GR =0.00000 CCL = 200.00 TTEN~0.00000 TEN =-200.00 SPD =0.00000 CN =0.00000 CNC =0.00000 CNRA=0.00000 Tape File Start Depth = 9676.000000 Tape File End Depth = 8900.250000 Tape File Level Spacing = 0.250000 Tape File Depth Units = Feet bls TAPE V~RIFICATION T.,,ISTZNG ~VP OlO,H02 YERXFICATION LISTING PAGE 1 ** REEL HEADER ** PATE 188/06/ ! OR'GIN : PREYZOU$ REEL' CONMENT8 ILlS T~PE~ $.A.P,C, D-27~ APl ~50-029-2~543 SERVICE ~A~E :EDIT ~ONT~NUATION # 801 PREVIOUS TAPE COMMENTS ILlS TAPE~ S.A,P'C.~ D'27~ API' #50~029-21543 $* FZ~E HEADER FILE NAME tEDIT ,001 SERVICE NAME : VERSION # OATg i PR~ISUS Fi~ ** I~FORMATION'RECORDS CN ! STANDARD ALASKA PRODUCTION CO : FN i' PRUDHOE BAY RA#GI~: STATi: ALASKA UN:IT TYPE: CATE SIZE CODE 000000 030 ~o~o~ o~o 000~ 000 004 065 000 000 002 065 00000~01~06 oooo~8oo o~ LVF OIO,H02 V£RIFICATZO~ bI$?ING, PAGB~ 2 AbASKA COMPUTZNG CENTER O#PANY = STANDARD AbASKA PRODUCTXON COMPANY _XKLD m PRUDHO£ BAY COUNTY = NORTH SLOPE BOROUGH STATE = ALASKA TYP I~LU~D N M~T~X '.SA!~DSTO E ToOL 229 A6 _TIED* XNTO CBT DATED 23-MAR-86 ON DIgPTH TO BHC. hlELL ,SHUT :lIN AT Obl00 27-MA¥-88. PPARE#TX#HP m 1'/00G.O.c.P6!ATAT94~OI 27..1~A¥-88. PERFORATED iNTERVAL m 9508"' ,,, 95?4** DATA HAS NOT BEEN DEPTH SHXtrTED ,,, OVERLAY5 !FXKI.,D PRXNT5. *~*** SCHLUMBERGER LOG$'XNCLUDgD W%TH TH%8 F%LE <EDXT.Oot>I <SEE FZLE EDZT.O02 FOR COLLAR LOCATOR DATA>' O#PENSATKD NEUTRON ~OG PASS %RST TO.bAST READZN'G! .~85w.TO 88 8 bVP OIO,H02 V~R{FICATiON LISTING PAG~ 4 FIR~ TO bAST READINGI COMPENSATED NEUTRON F~RS? TO bAST READZNGI DATA FORMAT RECORD $I~E REPR CODE ENTR~ TYP~ ! 66 4 8 4 73 60 16 66 ORDER COOt . oo o i', ", oooooooooooOOoo ooooo .~... ,s~ ___ oo~ ~ o o i ,~ oooooooooooooo ,c,~ .~ ~ oo ooo o , . oooooooooooooo ecr~ ~s c~oo ooo o , . , ooo. ooooo.oooooo .c - -- ooooo o o ee oooooooooooooo ~ ~t ~ ~-oooo o o . ~ oooooooooooooo ~'" "' ~'oo°° ~ ~lo o I ,. oooooooooooooo ~ ~ ,. oooooooooooooo ~R ~sa oa~z o o ~exz' .--2 Pu ooe ooo o o ~ e. oooooooooooooo o o 4 ~e oooooooooooooo TNRA .P82 O0 4 0 RTNR PS 0 4 .~~ ooooo ~ o ~, oooooooooooooo , c.oo :ooo ooo o ~ .,~ oooooooooooooo .¢r~ ~s~ c.s oo ooo ooo o , ,~, oooooooooooooo LVP 010,HO2 VERIFICATION LISTING PAGE 5 NTC P$2 FTC TENs NPH! PS3 TNRA PS3 RTNR RCNT PS3 CNTC PSi GR PS4 PHI P$4 i '~RA PS4 ~.?NR PS4 ~C~T P$4 tCFT PS4 CPS oO 000 CPS O0 000 bB O0 635 .GAP! O0 $ 0 PU O0 8~i0 O0 420 O0 00~ CPS O0 O0 CPS ~ 000 CPS 000 CPS O0 000 LB O0 635 O0 000 O0 000 O0 000 O0 000 oo O0 O0 CC, PS PS CPS CPS O0 0 0 4 0 0 4 0 0 4 O0 0 0 4 01 0 0 4 O0 0 0 4 O0 0 0 4 O0 0 0 4 O0 0 0 4 O0 0 0 4 21 0 0 4 O~ 0 0 4 O0 0 0 4 Ol 0 0 4 O0 0 0 4 O0 0 0 4 O0 0 0 4 O0 0 0 4 O0 0 0 4 oO o 4 ~ 0 4 ~R NRA ~JTC PHi CrT ~CNT t'~NS lO00 , oo ~,500 , ~65g ,oo TNRA: CNTC: Npp! gT00.0000 GR 482,9307 :2'6469 1223,4163 CfTC 24,26I'5 TNRA 441,8665 C~TC 32.~562 1367,g048 RCFT lO,O000 DEFT et:aR CfTC TNRA CNTC NpH! g600,O000 GR 2,7363 RCNT 696,4299 TENS 2.5220 RTNR 4,9775 CFTC 0,g472 TNRA "9gg :. CO 25C 0 CNTC 2500 :, 750 RCrT 13{~'~464 NPH! liO,O000 GR :2°9 49 RCNT 480.2~03 TENS 2,?335 RTNR t2~.4'41~4 CFTC .C~TC 23,43?5 ,9.9~ '99i "'99~ '999 :?NRA NPH! RCFT CFTC RCFT iO,O000 2..9615 RCNT 460*0575 TENS ~0:7969 RTNR 124!5,7305 :CFTC 47§: 47 ~ 5565 634S 0000 0000 004~ 20,4525 :TNRA 2,5126 665::~t~ C~TC 1756,4529 20 NPHX 6}~.5985 1846"t~6'o0 RCrT ,2690 OR ,89~6 1'~.770! RCNT !81~,47 5. LVP OiO.H02 VERIFICATION biSTING PAGE 6 RCFT GR RCNT TESS 'EFT NTC R OEPT RTNR CP?C RCFT DEPT RTN~ CFTC TNR~ CNTC NPHZ DEPT' RTNR CFTC TN~A CNTC CNTC 0000 NPH/ 9500.0000 GR 2,6640 RCNT 932.0771 TENS 2'68~5 RTNR 2309,3022 CFTC 22.6530 TNRA I001 0132 CNTC 63 2500 NPHI 2448 7749 RCFT 10 0000 NPH! 1774.6865 CFTC 671,.1034 TENS 10.0000 24'3705 TNRA 2,7395 RTNR 3,1-'333 6~'~62~0; CNTC 1752.4111 CFTC 661.0024 . 61 2.575 946 2 2616 2500 NPHI 22~2898 TNRA 6618 RCFT 872.1057 CNTC 0000 GR 57,43?5 NPH! 9364 RCNT 2568'6475 RCFT 8381 T~N$ 10;0000 GR 6453 RTNR 2,9750 RCNT ~! CFTC 1025,9885 TENS CNTC 2339.04844 CFTC 9300 ,:0000 R' 144~ ,21'9'4 RGCNT ,4719 TEN8 CFTC ~29.~3 TNRA 12~,,24' ! CN'TC ,076i HPH! 9200,0000 2"3892 RCNT 1445,6579 TENS 2,0706 RTNR 3105,1470 CFTC :14,3555' TNRA ~93,:0081 CNTC 23,4844 ~PHZ 3175,3145 R~FT ~0,0000 9100,0000 ~. ,6842 R~NT 24 ~ g'.7070 TEN8 t', 5948 RTNR 391t.3828 CFTC 2,6253~ 2462,0151 23,3499 9062 2726;4390 ~000 9447 325~ CNTC RCF? ,~000 GR! ,9220 RCNT ~9941 TENS ,9456 RTNR ;~5938 CFTC 1,9258 18,7813 3565,:'539! 10,0000 ',1383 173~,1501 oooo !0;oo00 2,6 t II CFTC I.~09~ ?NRA ~395'0598 C~TC 14~i920,4 TNRA 14.10~49;~ CNTC 8 RCFT ~0:O000 130~,5800 RCNT 4912 TENS 292~ 0823 RTNR 8096 CFTC I '7998 ,5469 2958,76 1:0.00~ 2,3269' 1400.0615 !2'~ 22,9687 NPHZ t458'*'9509 TENS t0.0000 GR ' 24.1406 2'093t RTNR 20.!628 RCNT 344709468 31.06'6970 CFTC 1.466'405'3 TENS t0.0000 14.~12 ~R:A ':i0 7 t4,6484 4'0'3'7529 .~RCFT 1'0.0000 ,5605 .t77 ,9106 ,'1,807 24~ .1424 , I875 LVP Ol!O.H02 VERIFICATION bIS?lNG PAGE ? NP)I 9.247 TNRA GR 67.0000 NPHI RCNT )940.306 RCFT ~ T~NS 10.000~ 216 NPHi 8 D~PT 1623,.3537 CFTC 425 50.'. 194 ?NRA 40'2,754$ CNTC 57,5000 NPH! ' 1652;1,787 RCFT 390 10.0000 )EPT 8900.0000 GR :rTe ! TENS 025,;1946 RTNR ,NRA ..3,.13S2 10 NTC 2 30.0,8018 CNTC R 43',~562 NPH! . ~NS 10,0000 NPH! '999 O0 TENS -999 4038 CfTC 2500 TNRA 2500 CN?C 0459 RCFT 0000 NPHI CFTC 8 TNRA ?4? 000 GR 317 RCNT $165 TENS 958 RTNR I 2 CFTC 16~2 TNRA 648? CNTC 8281 93 45 NPHI' RCFT GR RCNT TEN'$ RTNR CFTC TNRA CNTC ,,25(~0 NPHI ~25(~0 RCNT TNRA 2221.6339 RCNT .8403 TENS 381~.6009 NR 52 TNRA : 000 GR RCNT 41 9397 TENS 0447 RTNR tSS2:4S63 CFTC _24,6780 CNTC 910*8~91 TMRA RCFT "il' 395,5965 S 4,1649 NR ,~0,,0000 GR ..;:t goo .c., TENS 4'03,3? RTNR 1570~3416 CFTC 4087,6431 ~o0o O9 i0886 0938 O94? 0000 4 0400 404 9839 7563 7393 85 7500 000o 4130 1576 -999 3500 ,oo -999 2500 4 2000 rlbE NAHIC I~DXT .002 LVP 010.H02 V£RIFICATiON LI$?ING PAG~ 8 VERSION #' t MAXimUM LENGTH ** COMM£NTS 024 THIS.DATA HAS NOT BEEN DEPTH SHIFTED ., OVERLAY6 FIEbD PRINTS** 'SCHbUMBERGER LOOS'ZNCLuD D WITH <SEE F!b~ ~D!T,O01 FOR CNL/GR CASING COLLAR LOcATOR~ ' ~ASED HOLE DATA AVAIbABb I .9685~ TO ~ASING C~LAR bOCATOR - ~ASKD HOb~ DATA AVAIbABb£I 9685 TO 8897 ~ATA ,AVAIbAB~t 9685 tO 8698 ATA AVA[~ABbEt '9685 TO 8897 bVP ,OlO.'H02 VERIFICATION blSTING PAGE 9 DATA FORMAT RECORD ** NTRY BbOOK TYPE $,ZE R~PR CODE 9 4 16 t 66 0 1 66 A~UM 8P'ECIrICA?ION BbOCK8 NEM SERVICE SERVICE UNIT AP1 ,CLASS DEPT ' O0 000 O0 !!! 'S1 O0 I50 01 'PS:2 O0 t~ :01 .01 P84 O0 I50 01 0 ,?~...2,oo cc~ 'o oo6, cc~ *0020 ' 960~,2500 COb 0 0068 CCh *0146 * 950~,.2500 COb 0.0234 CCh ,0244 ~400,: 50 0,050~ * ENTRY 0 1 I0 .1IN 1 0 ' 4 REPR (OCTAL) ~ ~oooooooooooo oooooooooooo ~, o oooo~ooooooo ~ ogoooo ooooooo o~ oooooooooooooo 0,1123 0-0146 0.1953 .0,0352 COb -0,0020 COb :COb '0,02~$ COb 0.0117 · : COb 0,09]8 CCh ~0,0t66 ~VP OIO,H02 VERIFICA?ION LISTING PAGE ~T 920~.2500 CCL ~0469 DEPT 910~ 3 D~PT 900~.:1500 COL C~L ,:0371 DEPT 89~.2500 CC~ C~L .0303 OBPT 8~g .0000 CC~ CC~ ~,0420 "' ~,, 9775 CCI,, -,0.0059 COb .,,0.0059 CCL -0..0342 CCi, -999.2500 CC[, "0.7676 0,1143 '0,0020 "'0.0215 0.019~ rX~NA~. :EDXT**,Ooa D4T l ~AX~U~.LENGTH I $:0Z4 FiLE TYPE J - NEXT FILE NA~ t i, TAPE TRAILER:** ERVICE'NANE tEDIT · ATE 888/06/ t ' ~R!GI'NAir$2A TAPE ~ON~INUA'T]ON ~EXT T~PE~NA~£ COMHE~TS D'27, APl #50"029'21543 REEL TRAILER ~ATE I98/06/ 1 OR'IGZ~I ~EXT,R. EEL NAM£ APl #50-029-2~543 COL CCL CCL CCL 0,122! 0,0068 0,0156 .-999,2500 e6mqouv uolsslummO 'suoo se9 ~ I10 mlselv ,..--......--.....---.----, LIS T~PE VERIFIC~TIO:~ LI$1rZN$ LVP OlO.H02 VERIFICATION LISTIN~ PASE I ~:~ ~EEL' HEADER ;,~ SERVICE NAME :EOIT DATE :85/03! 7 ]R[~IN :. REEL~ N~ME : CO~TINLI~TIDN # :01 COMMENTS :LIBRARY T~PE ~* TAPE HEADER SERVICE N~ME :EDI! DRI$IN :00~0-. T&P~ NAME PR~IO~S T~PE COMMENTS :LIBRarY TAPE ~'~ ~ILE HE~DER' FILE N~E :EDIT VERSION # MAXIMUM LEMGTHi : 102¢ FIL~ TYPE PREVIODS~ FILE ~ INFORMATION RECORDS ~, MNEM CONTENTS" SN : ST&NDAR2 ALASKA ~N : D-Z7 FN : PRJ?DMOE BAY RANS: 13E CO'JN: N. SLOPE ST~T: AL&SK~ CTRY: US~ MNEM CONTENTS PRE S: E ~ COMMENTS PRO2UCTION CO J4IT J ,N I T em,mm TYPE 000 000 000 000 00 O ~ 000 000 000 000 TY P E 000 CATE O00 000 000 000 ~)00 O00 DO0 300 C ATE DO0 S I ! E 018 012 00 ~ OO~ 00~ 012 005 003 SIZE 0 0 ! - C O O E mm ,m ,mm, .mm- 065 065 065 065 065 065. 065 065 065 C 3 D E 065 LVP 010.H02 VERIF!CATID~iLISTINS PAGE 2 SChLUMBERgER ALASKA CgMPJTI~ CENTER COMPANY = STA;YDAR2 ALASKA aETROLEJM ~ELL = FIELD = PRUDiOE )~Y CDJ~TY = tORTt. SLOPE STATE = JO~ NUMBER. AT aCC: 71315 RLtY #1, DATE LO~GEO: 2~-FE~-86 LDO: M. OGDEN CASING = 9.625" 9 $991'0' TYPE FL'JID = L.S DISPERSE) DE~SIT~, = g.gO LB/C, VISCOSITY = 33.,0 S PM =' lO'O FLJID L,~SS = 10.3 C~, ~IATRIX SANDSTONE DHC=NONE BITSIZE RM RMF RMC RM AT = 8.5" BHT g78~.0o = .~,-B~-9 @ 50'0: DF- = ~,.67;3 @ 58.0 DF = ¢.i7D @ ¢2.0 DF = 1o$35~ @ 169. DF LVP O13.HD2 VERIFIC~TI3~ LISTIN.S PAGE THIS ~ATA ,HAS NOT, BEEt DEmTH SHIFTED~ - 3V~RL~YS :IEL2 PRIiTS SCHLUMBER2ER LOGS INCLUDED WIT~ T~IS MAGNETIC TAPE: 3J~k INDUCTI]~ SP~ERI:~LL¥ F~CUSE) LDG (DIL) B3REH~LE COMPENSATED LO2 CB~'C) ~ LITHD DENSIT~ COM~ENS&TED LD~ (LDt) ~ C~MPE4$~TED qE~TR~N LgG (LDT) ~ DAT~ AVAILABLE: 976~.0° TO 8982.0' ~ ELECT,RDM~SNETIC P~DPASAT~DN T3DL (EPT) ~ DAT~ AVAILABLE:. 9759.0' TO 898Z.D' THERE ~RE TWg FILES 5ECAJSE gF DIFFERENT SAMPLIN~ R~TES. L¥~ 010.HD2 VERIFIC~TI31 LISTINS PAGE ~¢ 3AT~ FORMAT RECORD ENTRY BLOCKS TY~E Z BLSCKS iNIT 3~MM O~MM ~PI USFF ~API IN' 3/C3 3/C3 C ~ S C'aS ~)E,~: SP SR CA Lt 9810'5000 -39,6133 -999-2500 -999'2500 -999°2500 -999~2500 9EPT SP SR NRA T gSO0.O000 -35o5195 2.3.~59 SFLJ SR CALI FCNL ~R SFLJ' SR CALl RNRA LOG O0 O0 O0 O0 O0 O0 O0 O0 O0 O0 O0 O0 O0 O0 O0 O0 O0 0,0 O0 O0 O0 O0 SIZE 1 1 1 1 aPI TYPE 000 120 010 310 520 310 310 28O 350 000 890 358 330 330 000 000 280 310 REAR' C~3E 65 65 73 65 66 66 ~PI CLASS O0 01 ~6 01 01 80 01 01 01 OZ 01 O0 O0 01~ 3O 01i 01 ~P 0 0 0 0 O 0 0 O O 0 0 0 0 0 0 0 0 FILE ~0. 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 SI ENTRY 0 .lIN 1 0 ZE SPL: RE;~R C32E 1 ! $ B ! $8 I SB ! ! $ 8 ! 58 PROCESS COCT&L) 00000000000000 00~00000000000 00000000000000 0~3000~0000000 00000000000000 00000000000000 00000000000000 00000000000000 00000000000000 00000000000000 00000000000000 OOO000~O000000 00000000000000 58 00000000000000 00000000000000 00000000000000 $B 00000000000000 ,~'O000000000OO 68 000000000000~8 5B:00O00000000000 $8 0000000000000:0 6~ OOO0000000OO00 ~.$295 ILO $?.777~ -999.2')00 RHD8 -9)9.2500 NPHI -999.2500 ~SS -999.2500 ~.6296 ILO 57.7773 DT 7.~B90 RH3B 5.80931 75-5Z73 -999.2500 -999.2500 2"~$12 Z5-2~1 IL~ DR~O PEF QLS ILM ~R DR~9. P'EF 67'7773 -999.2500 -999.2500 $7'7773 2.:t~00 LV~ 010.H02 VE~IFIC~TIgN L[$TIN~ PA~E 5 ~C~L 3~99.~000 FCNL CALI T.~890 SR 3E~- 9700.020~ SFLJ SP -89.7852 SR GR 53.5430 CALl NR~T 2.3401 RNR~ ~C4L 3009.5000 FCNL CALI 8.6853 GR DEPT 9600.0000 SFLd SP -101.5352 GR 2R 18.7861 CALI NRAT 2.~}63 RNR~:. NCNL 3309.50001 FCNL C~LI 8.5723 GR DEPT 9500~:,0000 SP -23.2651 ER 101,0273 ~C~L: 299'7-5000, CALi 8.8457 DEPT 9400.0000 SP -139'0~25 ~R 22.2705 NR&T 2,0295 NC~L 3753.5000 DEmT: 9300-0000 SP -90.¢727: SR Z6.2393 4R~T 2'~$70. NC~L 3701-5000 CALI 8.5?23 ~EPT SP GR NR~t NC~L CALI DE,mT SP GR NCiL~ C A L't 2EPT. 9200. -100- 76. 2. 3629. 8. 9100' '59' 112. I. 5739. 8. 9000- -60- 0000 5 97? 9~48 5~25 50 O0 ~660 0000 2383 0273 350¢ 2~00 9395 0000 9883 SFLJ' GR CALt RNR~ GR SF]LJ CALI RNR~ FCNL GR SFLd SR 1559.6875 QSS 104.7148 7.9070 IL3 f~O. 4692 DT 8.¢863 RH3B 2.4163 NP~II 12~.5. 6875 QSS 53.5630 16.0332 19.4893 DT 8.5723 RH~B 2.5725 NP~I 1286.6875 QSS 18'7861 9.~73 Ig) }5.21¢8 DT 8°8657 RHgB 2.5613 NP~I 1179.$875 OSS' i~1.0273 19~7393 18.6299 8.5723 22.2705 ILg RHDB NPHI QSS 16.3176 ILD 16.4736 8.5723 2,.6975: NPMI 1371-6a75 QSS 26.2393 25- 2Z36 ILO 37.3555 DT 8.6560 RH~B 2.7112 NPHI 1254,.6875 QSS' 76.9548 252-1606 IL~ 123.7168 8.9395 RHO8 1, ~'776 3883.5000. QSS 112..0273 2.2¢05 IL~ g0.2773 DT 0.0376 3.4126 91.~023 2.3555 2~.0236 0.0132 4.5710 95.5898 2.2190 26.2207~ 0.0161~ 8.2~88 74.0273 2.6648 27.1684 0.0}73 17.2549 82-5273 2.~553 19.2383 0'1060 17.0574 95.6523 2.21'90 25.7~13 -0,0~10 23.692¢: 90'8398 2.4551 27.2~49 '-0.0088 212.3125 60.4~,92 2.6584 -0.0:1.17 QLS ILM DR~ PEF ~LS IL4 GR DR-,I 3 PEF QLS GR. PEF QLS GR PE F ILM: GR DRY3 PEF QLS GR DRHO pE:~ QLS IL~ ~R DRMD PEF QLS 1.5~79 101.5273 -0.0034 3.7053 40.4492 0.0015 2.3577 0.0259 5.1653 19.6893 -0.0029 1.9522 0.0161 8.0098 95.2148 0.0142 3.0999 0.0151 14,5957 18.6299 -0'0181 2'7815 0.0073 12.0879 16.4736 -0'005¢ 1.9239 0.0098 22-8643 37.3555 -0-0010 2.5586 -0-0166 86'3398 103.7148 '-0.0181 5.9~21 1-7354 90'2773 LVP OlD.H02 VERIFICATION LISTIN~ PAGE 6 SR -999,2500 CALl NR~T -999.2500 RNR~ NCNL -999.2500 FCNL CALI -999.Z500 2R DEPT 8900.0000 SFLJ SP -62.~883 SR ~R -999.Z500 CALI NR~T -999.2)00 RNR~ NCNL -999.2500 FCNL C~LI -999.Z500 GR BEPT 8g00.0000 S~LJ SP -65.g~B3 ~R GR -999.2500 CALI NR~T, -999.2500 RNR~ NC~L -999.2500 FCNL CALI -999.2500 SR DEPT 8700-0000 SFLJ SP -62.6570 3R. -999.2500 C~LI NR~T' -9~99'2500 NC~L -999°2500 FCNL~ C~LI -~99-250D' DEPT. 8:$31.50001 SFL~ SP -34.6883 ~R SR -.999.2500 CALi NR~T~ -999.2500 RNR~ 4C~L '-999.2500 FCNL~ CALI -.~99,Z500 GR -999.2500 -9)9.2500 -9~9.2500 -999.2500 2.6983 $3.5B30 -9)9.2500 -999.2500 -999.2500 -999.2500 2.0295 $5.8398 -9~9.2500 -999.2500 -9~9.2500 -999.2500 2.5588 72.7773 -999.2500 -999.2500 -999.2500 -999'2500 2.9617 ~7-Z$17 -9~9.2500 -999.2500 -9)9.2500 -999-2500 NP~I QSS ILD DT RH3B NPflI QSS IL3 DT: NP4I ~SS ILD DT RHD3 ~SS RH3B NP~I ~ mILE TRAILER ** FILE N~ME :EDIT .00! SE2V!CE NA4E : VERSION # : DATE : 4AXIMUMi LENGTH : 102~i NEXT. FILE 4~ME' : ~,' FILE HE~DER FILE N~ME :EDIT .002: SERVICE NAqE: : VERSIO~ # : M~XIMUM LENGTH FILE TYPE : PREVIOUS' FILE : -999.2500 -999.2500 5.6360 52.1992 -999.2500 -999.Z500 -999.2500 SR DR,-I~ PE: ~LS $.5B28 $2.6992 -999.2500 -999.2500 PEF -999.2500 QLS 6.1062 70.3398 -~99.2500 -999.2500 -999.2500 5.3289 70.0B98 -999.2500 -999.2500 -999. 2500 ILM GR DR,q~ PEF I L M' GR DRHD QLS -999.2500 -999.2500 -999.2500 2000.6B75 $3.5630 -999.2500 -999.2500 -999.2500 20DO.6B75 55.8398 -999.2500 -999.2500 -999.2500 2000.$B75 72.7773 -999.2500 -999.2500 -999.2500 2000.5875' 67,2617 -999.2500 -999.Z500 -999.2500 LV~ 010.HO2 VERIFIC~TI0~ LISTINS PAGE ? e~ DATA FORMAT ENTRY BLOCKS ~ECORD *~ TYPE 2 15 DATJM SPECIFICATIDN BL3CKS MNEM. SERVICE SERVICE iNIT ID OR3ER .J DEPT FT TPL! E,aT NS/M, EATT EPT O~/M SIZE 1 1 1 1 9806. 3320 9800'1S60 9700.1S~0 9500o 1 9500.1660 9300.1660 9200. 1560 9100'1560 9037' 5000 TPL T P L. T PL TPL TPL TPL TPL:: TPL: TPL T PL 4~.: FILE TRAILER FILE NAME :EDIT; .002 SERVICE NAME : VERSION A~ : DATE : MAXIML~M LENGTH : 102~, FILE TYPE NEXT: FILE NAME ~PI API LOG TYPE CLASS O0 000 O0 O0 132 01 O0 890 OD, O0 130 O1 REPR CO~E 65 73 65 66 ENTRY 0 1 ZO .lin 1 9.9551 9.9551 10.2D51 9.5801 10.5801 10.1~+25 9.0801 9.9551 11,1~2~ EP;~I EP~I EPHI EP ~ I EP~I EPMI EPMI EPHI EPHI EP~I API FILE SIZE 13D NO. 0 0 0 0 0 4 0 0 SPL REPR PROCESS C3DE COCTAL) I 5B OOOO0000000000 1 58 00000000000000 1 58 00~00030000000 1 58 00000000000000 3-~180: 5.6152 7.~707 0.0000 7.275~ 5.3711, -2.1~8~ 4.6B75 EATT: EATT EATT EATT EATT EATT EATT EATT EATT EATT 190.3125 190.3125 157.3125 159.3125 228.3125 188.3125' 169.3125 196'3125 113.I523 158.3125 LVP 013.H02 VERIFICATI3~ LISTIN~ PASE 8 (c4c TAPE TRAILER -~e SERVICE NAME ORISIN :OODO TA~E NaME :1315 ~O~TIN~TI3N ~ :01 ~OqqENTS :LIBRarY T~PE 4~, REEL TRAILER SERVICE NAME :E~IT.~ DATE :85/03! 2RI$IN : RE~L~ NAME : ~O~TIN'..J~TI~N # :01 NEXT RE~L N~ME : COMMENTS' :LIBR'A~¥ T'6PE