Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAbout186-041Image Project Well History File Cover Page
XHVZE
This page identifies those items that were not .scanned during the initial production scanning.
They are available in the original file, may be scanned during the rescan activity or are viewable
by direct inspection of the file.
-J J~ ~- ~ L Well History File Identifier
RESCAN DIGITAL DATA
OVERSIZED (Scannable)
[] Color items: [] Diskettes, No. [] Maps:
[] Grayscale items:
[] Poor Quality Originals:
[] Other, No/Type []
Other items scannable by
large scanner
OVERSIZED (Non-Scannable)
D Logs of various kinds
TOTAL PAGES:
ORGANIZED BY~BREN
NOTES:
VINCENT SHERYL MARIA LOWELL
DATE:
[] Other
Project Proofing
[] Staff Proof
By: Date:
PROOFED BY: BEVERLY BREN VINCENT SHERYL MARIA LOWELL DATE:
lei
Scanned (done) Illllllllllllllllll
PAGES: ./~-~ (at the time of scanning)
SCANNED BY'. BEVERLY BREN VINCEN~ARIA
LOWELL
RESCANNEDBY: BEVERLY BREN VINCENT SHERYL MARIA LOWELL
General Notes or Comments about this file: / O/~? /0 2--
/
PAGES:
DATE:
~si
Quality Checked (done)
Rev1NOT,Scanned.v4x~
MICROFILMED
9/11/00'
DO NOT PLACE
ANY NEW MATERIAL
UNDER THIS PAGE
Memorandum
To' Well File:
Re.'
State of Alaska
Oil and Gas Conservation Commission
D,,T
Cancelled or Expired Permit Action
EXAMPLE' Point McIntyre P2-36AXX API# 029-22801-95
This memo will remain at the front of the subject well file.
Our adopted conventions for assigning APl numbers, permit numbers and well names did not
specifically address expired or cancelled permits. This omission has caused some inconsistencies in
the treatment of these kinds of applications for permit to ddll. Operators have asked us to adopt
formal procedures for this class of permit application in order to prevent future database disparities.
If a permit expires or is cancelled by an operator, the permit number of the subject permit will remain
unchanged. The APl number and in some instances the well name reflect the number of preexisting
reddlls and or muitilaterals in a well. In order to prevent confusing a cancelled or expired permit with
an active well or multilateral these case sensitive well identifiers will be changed for expired and
cancelled applications for permits to ddll.
The AP! number for this cancelled or expired permit is modified so the eleven and twelfth digits is 95.
The well name for a cancelled or expired permit is modified with an appended xx.
These procedures are an addendum to the APl numbering methods described in AOGCC staff
memorandum "Multi-lateral (weiibore segment) Ddlling Permit Procedures, revised December 29,
1995.
AOGCC database has been changed to reflect these changes to this permit.
Steve McMains ' t
Statistical Technician
600 W. International Aiq~ort Road
Anchorage, AK 99518-1199
ATTN: Sherrie
NO. 8872
Company:
1
Alaska Oil & ~ Cons Comm
Attn: Larry Grant
3001 Porcupine Drive
Anchorage, AK 99501
8/19/94
Field: Prudhoe Bay
Well Log Description BL RR Sepia RF Sepia Mylar
,~_~;_1.24A ........ jPERF RECORD (7-29-94) '" i 1 '
D,s. 3-16 ...... PERF RECORD (7-29~94) "' 1 1
-DS. 3:16" INJE, C PROFILE (7-30-94) ....... 1 1
D.S~ 12-17 " PR°D PROFILE (7-28~94) ' .... 1 . 1
~?.D.S.. 15'35 .... pERF RECORD (7.3!.94) 1 1
.D.S. 17-4 PROD PROFILE (7-29-94) , 1 1
~D.S. 1-30 PERF RECORD (7.-.29'94) 1 1
~D'S. 12'2 PERF RECORD(7.-30-94) ..... '" ...1 1
/------D.S" 12-32 ...... PROD PROFILE (7-28.94) .....
~.~D~. 15'36" GR-CX~L JEWELRY (7-31..-94) '
?~D~. 15".36 .. PERF RECORD (7-31-94) .
,~D~. 16.-.9A HIGH RATE INJEC PROFILE (7T31-94) ....
SIGNED:
Please sign and return one copy of this transmittal to Sherrle at the above address. Thank you.
ARCO Alaska. Inc.
P.O.Box 100360
Anchorage. Alaska
DATE: 7-20-93
99510
REFERENCE: ARCO CASED HOLE FINALS
Prod Profile
1-28 ~'? ~-18-93
3-25A ~?'~3 6-17-93
3-31 } V-?z 6-16-93
3-32 ~ ~/-~i7 6-15-93
3-33 ~ ¥~ ~,o 6-16-93
4-8 ?~-r~ 6-11-93
5-14 ??-~ 6-12-93
6-22A ~ ~.[v6-6-93
6-22A - 6-10-93
7-25 ~-y ~. 6-6-93
9-44 f ~ ~ ~ z~6-6-93
11-18 f~-1~6-7-93
14-6 ~ ~- ~6-8-93
14-8 ?~-/,~ 6-10-93
14-13 ~'id 16-13-93
14-15 tl-~ 6-8-93
16-4A tz'1¢~6-9-93
16-17 ~ zz~6-14-93
16-31 ~-~{ 6-7-93
17-4 ~ ~ ~ 6-14-93
AGI-5 5~- ~-6-13-93
AGI-6 ~-d~ 6-14-93
AGI-7 _6-8-93
AGI-7 ~ ~-t6-15-93
AGI-7 6-17-93
Completion Record
Plug Setting Record
Plug Setting Record
Plug Setting Record
Perf Record
TBG Cutter Record
Leak Detect
Leak Detect
Perf Record
Perf Record
Production Log
PITS/Leak Detect
Leak Detect
Inj Profile
Completion Record
Prod Profile
Perf Record
Production Log
Completion Record
Completion Record
Completion Record
Perf Record
Run 1, 5"
Run 1, 5"
R-n 1, 5"
R.n 1, 5"
Run 1, 5"
R.n 1, 5"
R.~ 1, 5"
Run 1 2"
R~m 1, 5"
R~_!n 1, 5"
Run 1, 5"
R-n 1, 5"
R!!n 1.5"
R.n 1, 2"&5"
R,n 1.5"
Run 1, 5"
R-n 1, 1"&5"
R._n 1, 2"&5"
Rlln 1, 5"
R-n 1, 5"
R-n 1.5"
Run 1, 5'
Run 1, 5"
R.n 1, 5"
R,n 1, 5"
Sch
Sch
Sch
Sch
Sch
Sch
Sch
Sch
Sch
Sch
Sch
Sch
Sch
Sch
Sch
Sch
Sch
Sch
Sch
Sch
Sch
Sch
Sch
Sch
Sch
AGI-8 qS-'$ 3/6-9-93 GR/CCL R,n 1, 5" Sch
AGI-97 ~ ,1.'}~' 6-9-93 GR/CCL R-n 1, 5" Sch
AGI-91 -~' 6-17-93 Pe~ Record R-n_ 1, 5" Sch
me~esi~dretm~~ch~~~ .
Sony, W~ace APPROVED_~~ e_ ~,
ATO-1529 ~~ 93073 ~ ~ ~ ~ ~
~ CE~~ F~ ~ ~~ "~ ~ ~d
:
i STA~ OF ~~ ~ MOB~ '~/~.
* ~e ~~t ~ ~ ~32 h ~21141~.
= ~e c~ct ~H ~e for ~ l~ ~ ~2~
February 10, 1986
Mr. T. P. Oostermeyer
Regional D-rilling Engineer
ARCO Alaska, Inc.
P. O. Box 100360
Anchorage, Alaska 99510-0360
TELECOPY NO.
276-7542
Re- Prudhoe Bay Unit DS 16-31
ARCO Alaska, Inc.
Permit No. 86-41 .
Sur. Loc. 2096'FNL, 1337'FI~rL, Sec. 24, T10N, R15E, U~.~.
Btmhole Loc. 2382'FSL, 2514'FWL, Sec. 24, T10N, R15E, U~.
Dear Mr. Oostermeyer:
Enclosed is the approved application for permit to drill the
above referenced well.
The permit to drill does not indemnify you from the probable need
to obtain additional pez-~nits required by law from other
governmental agencies prior to commencing operations at the well
site.
To aid us in scheduling field work, please notify this office 24
hours prior to commencing installation of the blowout prevention
equipment so that a representative of the Commission may be
present to witness testing of the equipment before the surface
casing shoe is drilled. Where a diverter system is required,
please also notify this office 24 hours prior to commencing
equipment installation so that the Commission may witness testing
before drilling below the shoe of the conductor pipe.
Ver~. truly ~rs,
C. V. Chatter~on
Chairman of
Alaska Oil and Gas Conservation Commission
BY ORDER OF THE cO~fISSION
dlf
Enclosure
Cc: Department of Fish & Game, Habitat Section w/o encl.
Department of Environmental Conservation w/o encl.
Mr. Doug.L. Lowery
ARCO Alaska, Inc
Post Office _.,x 100360
Anchorage, Alaska 99510-0360
Telephone 907 276 1215
February 4, 1986
Mr. C. V. Chatterton
Commi s s i oner
State of Alaska
Alaska Oil & Gas Conservation
Commi ssion
3001 Porcupine Drive
Anchorage, AK 99501
SUBJECT: DS 16-31, Permit to Drill
Dear Mr. Chatterton:
Enclosed are:
° An application for Permit to Drill DS 16-31, along with
a $100 application fee
° Diagrams showing the proposed horizontal and vertical
projections of the wellbore
° Proximity plots
o A diagram and description of the BOP equipment
A diverter system will not be used for this well. We estimate
spudding this well on February 18, 1986. If you have any
questions, please call Ed Cole at 265-1635.
Sincerely,
T. P. Oostermeyer
Regional Drilling Engineer
TPO/ELC/tw
RECEIVED
Enclosures
AJaska Oil & Gas Cons. Commission
Anchora~o
ARCO Alaska, Inc. is a Subsidiary of AtlanticRichfieldCompany
STATE OF ALASKA
ALASKA u~L AND GAS CONSERVATION COMMISSION
PERMIT TO DRILL
20 AAC 25.005
la. Type of work.
2. Name of operator
ARCO Alaska, Inc.
DRILL
REDRILL
DEEPEN
lb. Type of well
EXPLORATORY ~
DEVELOPMENT OIL)~
DEVELOPMENT GAS []
SERVICE [] ST R A T I G~,A P~:JC.
SINGLE ZONE ~'~
MULTIPLE ZONE
3. Address
P. 0. Box 100360, Anchorage, Alaska 99510
4. Location of well at surface
2096' FNL, 1337' FWL, Sec.24, T10N, R15E, UM (proposed)
At top of proposed producing interval
2460' FSL, 2400' FWL, Sec.24, T10N, R15E, UM @ Target
At total depth
2382' FSL, 2514' FWL, Sec.24, T10N, R15E, UN
9. Unit or lease name
Prudhoe Bay Unit
10. Well number
16-31
11. Field and pool
Prudhoe Bay Fi eld
Prudhoe Bay 0i] Pool
5. Elevation in feet (indicate KB, DF etc.) 6. Lease designation and serial no.
RKB 70', PAD 38' AMSL ADL 28332 ALK 2328
12. Bond information (see 20 AAC 25.025) Federal Insurance Company
Type Statewi de Surety and/or number #8088-26-27 Amount $500,000
13. Distance and direction from nearest town 15. Distance to nearest drilling or completed
12 mi. E of Deadhorse 16-5 well 90' @ 3988'TVD feet
16. Proposed depth (MD & TVD)
9616'MD, 9242' TVD
19. If deviated (see 20 AAC 25.050)
KICK OFF POINT 6300 feet.
21
14. Distance to nearest property or lease line
miles 2382' ~ TD feet
17. Number of acres in lease
fe~t 2560
20. Anticipated pressures
MAXIMUM HOLE ANGLE32 o (see 20 AAC 25.035 (c) (2)
Proposed Casing Liner and Cementing Program
18. Approximate spud date 02/18/86
'$2:/~ psig@_ 80°F Surface
4290 _psig@ 9242 ft. TD (TVD)
SIZE CASING AND LINER SETTING DEPTH QUANTITY OF CEMENT
~ Hole ~n~J Weight Grade Coupling Length MD TOP TVD MD BOTTOM TVD (include stage data) ..
30~ 3~ 91.5# H-40 Wel¢ 80' 31 ' I 31 ' '- 111 ' I 111 ' 2000# Poleset
'17-1/2" 13 8" I I 2700' 2300sxCS 111&700sx CSII
i - 72.0# L-80 BTC 2670' 30' 30' 2700' l
13-3/8"
'+ 2 jts 68.0# I K-55 BTC at top of csg. ~tring.
~12-1/4"', 9-5/8" 47.0# I L-80I BTC 9587, 29, : 29' t 9616,'
, ' I 9242' 800 sx Class G
22. Describe proposed program:
ARCO Alaska, Inc., proposes to directionally drill this Sad~erochit development well to 9616'MD(9242'TVD). A
13-5/8", 5000 psi, RSRRA BOPE stack will be installed and tested (rams 5000 psi, annular 3000 psi) upon
installation, weekly and operationally tested each trip. After reaching TD, logs will be run across selected
intervals. The well will be completed using a workover rig at a later date. A string of 5-1/2", 17#, L-80
tubing will be run and set above the Sadlerochit. A downhole safety valve will be installed and tested upon
completion of the job. Non-freezing fluids will be left in all uncemented annuli within the permafrost
interval. Selected intervals will be perforated in the Sadlerochit formation and reported on subsequent
reports. Reserve pit fluids will be disposed of down the 9-5/8" x 13-3/8" annulus of this well. The 9-5/8" x
13-3/8" annulus will be left with a non-freezing fluid during any interruption ~n the disposal process.
Upon completion of the disposal process, the annulus (see attached sheet)
23. I hereby certify that the foregoing is true and correct to the best of mv knowledge
SIGNED ~'/~' o~ TITLE Regional Drilling Engineer
T h e space bel~-~ ~-0~ ~:
CONDITIONS OF APPROVAL
Samples required Mud log required Directional Survey required APl number
~YES '~I~N O E~YES [~I,N O ' I~YES F__~NO 50- 029-2155]
Permit number Approval date
86--41.,..~ .. _02L10/86 SEE COVER LETTER FOR OTHER REQUIREMENTS
APPROVEDBY //'/'~./~COMMISSIONER DATE Febrll[tI-~ 10, 1986
~ ~-~ ¢ k ~/~~~/~ by order of the Commission '
Form 10-401 (EL~)) PD/PD223 - /' / / Submit in triplicate
n_., -~ ,I o~
PERMIT TO DRILL
16-31 (cont'd)
will be sealed with 300 sx cement followed with Arctic Pac. The AOGCC has waived the requirement for a surface
hole diverter system on Drill Site 16. Therefore, a diverter system will not be used for this well.
D8 16-31
' 20" ' CASING' ' ' ' ' ' T~/D' ' --'-' '111' ' ' ' ' ' ' ' ' '" ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' '
: ARCi AL ,SKA, lNG.
; llCALE I IN~ = la88 Fl.
SHL:2096'FNL,1337'F~
SEC.24,'P10N,R15E,U~ I.
_ ~- 13-3/8' CASING TVD = 2700 THL:2460'FSL,2400"FV fL,
~oo~
S 66 DZG44 MIN E
1288 Fq {TO TARGET)
AVERAGE ANGLE
.., 31 DEC EE MIN
KOP TVD = 8aO0
.5
1.9 EOC TVD 5.
=7612 MO=7 77 DEP=3 ;
8000
K- 5 TVD = 8350 MD = 8564 DJ ;P = 869
O/WCOHfACf TVD=9115 MD=948{ DEP=13~6
9-5/8' C:ASING TVD = )242 MD ~ 9615 DEP ~ 1424
TD TVD ' 9242 MD -- ~'616 DEP = 142'4
~0000
-
, '~' , ', ....................... ", ...................................
1000
2000
3000
~000
SO00
6OOO
7OO0
8000
90OO
10000
1 lO00
0 1000 2000 3000 zlO00 5000 8000 7[100
VERT I CF:IL SECT I ON
5000
6000
EL_]
I I
Z
......E - 1,',1 I300RBINla~£S ....
-2000 -1000 0 LO00 2000 3000 4000 5000
SEC.24,T1C N,R 15E,U M. ~}
THL:2460'F: iL,2400'FW~
~ SEC.24,TlO N,R1fE,UM.
TARGET .
TVD = 9020
TMD = 935~
DEP = 1286'
S 724
E 1063
, ~ ,
i I
.
' ' ' ' ' ' ' ' ................ ' ......................... ~ '~'lt '~' '~1' 1~ ' '
0
CD
CD
CD
IS - ki COORBINnTISS
-2000 -1000 0 1000 2000 3000 4000 5000
3S 16-3~ -
il
~""~" 5000
-2000 -1000 0 1000 2000 3000
E - N' COORSIN~T~S
CD
0
0
0
0
I
-300
'~,~ 1~7 ....
.
~856
110
- i~P~/.~g~Z) %79~
~ O~ 16-31
,, ,
E]- N COOROINATE$
-300 -200 - O0 0 100 200 300 400
759
'200 - O0 0 100 200 Alask~Ou~il & O.~c C:~.0
g - N COORDINATES ~- ....
E - kl OOORDINFtTES
600 ?00 800 900 ~ 000 11 O0 ] 200 ~ 500 ! ~00
I
I
0
CO
I
I
I
6oo zoo soo soo ~ooo ~oo ~.oo ~oo
15-5/8" BOP STACK DIA~
PI'P~ Rtqt~
~.,cumulator Capacity Test
1. Check and fill accs~ulator reservoir to proper
level with hydrsulic fluid.
2. Assure that accumulator pressure is $000 psi with
1SO0 psi downstream of the resulator.
5. OBserve time, then close all units simultar~ously
and record the time and pressure remaining after
all units are closed with chargin~ ~ off.
4. Record on IADC .report. (The accelrcable lower limit
is 45 seconcls closing time and lZ00 psi remainin~
pressmre.
13-5/8~' BOP Stack Test
1. Fill ~OP stack and mauifold with a non-freezing
liquid.
Check that all hold ~cwn screws are full), retracted.
Mark runnin$ join~ with predetermined plu~,seating
del~h. ~un test plug on' drill pipe and seat in
5. Close anr~ar preventer and u~stream valves.
4. Functionally test chokes.
· 5. -In each of the following tesM, first hold a 250 psi
low pressure test for a ~ of ~ minu~es, then
test at the high pres~xem-~
6. Increase pressure to ~~ hold for a mimmum
of 3 mim~es. Bleed ~ure to zero.
7' O~en annular preventer and clg~-~set of pipe
r~n~. Increase pressure~co ~0~ hold for at
least $ minu~es. Bleed pre~ to zero.
8. Close valves dire~ly u~strea of chokes and open
chokes. Increase pressure to 5000 psi and hold for
at least ~ mir~ces. Bleed pressure to zero.
9. Open top set of pipe rsms then close hot:c~ set of
pipe r~ns. Increase pressure to 5000 psi below the
bottom set of pipe rams and hold for at least 3 min-
ute5.
I0. Test re_~,~_~n~ untested nmni£old valves (if any)
with 5000 psi u~stream of valve ar~ zero pressure
Bleed pressure to zero. Open bortcm set of pipe
Back off rurming joint and pull ou~ of hole. Close
blind rsms and test to 5000 psi for at least $
mir~tes.
Bleed pressure off all equil~nent. Open blind r~nm.
Make sure 'manifold and lines are f~ll of non-
~reezing liquid and all valves are set in drilling
position.
Test standpipe valves to 5000 psi.
Test ~elly cock~ and inside BOP to 5000 psi with
~ocme?
Check operation of Degasser.
Record test information on blowout preventer test
form. Si~n and send to Drilling Supervisor.
perform complete BOP£ test once a week and func-
tionally operate BOPB daily.
Revised 1/Zl/84
/
fOR NEW WELL PERMITS
Company
Lease & Well No.
16 - 3/
ITEM APPROVE DATE
(2> Loc
(2 thru 8)
(3) Admi . ' L- (~ ,~ 9.
(9, thru 12) / 10.
(10 and 1'2)z 12.
(4) Casg ,~.~,~.
(13 thru 21) '
(5) BOPE ~.~. ~-g-~$
(22 thru 26)
1. Is the permit fee attached ........................................
2. Is well to be located in a defined pool ........................ ..
3. Is well located proper distance from property line ... '' ...
· 4. Is well located proper distance from other wells ...............
5. Is sufficient undedicated acreage available tn this pool [! il.i
6. Is well to be deviated and is wellbore plat included .....
.
7. Is operator the only affected party ..................... '
8. Can permit be approved before ten-day wait ........................
13.
,14.
15.
16.
17.
18.
19.
20.
21.
YES NO
22.
23.
24.
25.
26.
27.
Does operator have a bond in force .................................. ~
Is a conservation order needed ...................................... ~
Is admin±strative approval needed ..................
Is the lease number appropriate .................... '................~F~x~'~
Is conductor string provided ........................................
Is enough cement used to circulate on conductor and surface .........
Will cement tie in surface and intermediate or production strings ...
Will cement cover all known productive horizons .....................
Will surface casing protect fresh water zones ..' .....................
Will all casing give adequate safety in collapse, tension and burst..
Is this well to be kicked off from an existing wellbore .............
Is old wellbore abandonment procedure included on 10-403 ............
Is adequate wellbore separation proposed ............................
Is diverter system' required
a eeeelele,eeeeeeeeee,eeeeeeeeeeeeeeeeeee
Are necessary diagrams of~_~=~ ....... ~-- ~_ ' BOP equipment attached .......
·
Does BOPE have sufficient pressure rating - Test to ~2~l~ psig ..
Does the choke manifold comply w/API RP-53 (Feb.78) ..................
I th p f H2S g 'probabl
s e resence o aM e ............................o....
· Additional requirements .............................................
REMARKS
Additional Remarks:,
O
Geology: .Engineering:
HW -- i
WVA~~. MTM ~. HJH~-~
rev: 03/13/85
6.011
...... iNiTiaL GEo. 'UNIT oN/OFF
~99L CLASS,,,STATUS AR.F_.4~ NO. SHORE
. .,.j. / o . il d