Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout213-1731. Type of Request: Abandon Plug Perforations Fracture Stimulate Repair Well Operations shutdown Suspend Perforate Other Stimulate Pull Tubing Change Approved Program Plug for Redrill Perforate New Pool Re-enter Susp Well Alter Casing Other: ESP Swap 2. Operator Name: 4. Current Well Class: 5. Permit to Drill Number: Exploratory Development 3. Address:Stratigraphic Service 6. API Number: 7. If perforating: 8. Well Name and Number: What Regulation or Conservation Order governs well spacing in this pool? Yes No 9. Property Designation (Lease Number): 10. Field: NIKAITCHUQ 11. Total Depth MD (ft): Total Depth TVD (ft): Effective Depth MD: Effective Depth TVD: Junk (MD): 22,370' main 21,465' L1 Casing Collapse Conductor Surface 260psi Intermediate 3,090psi Production slotted Production slotted Packers and SSSV Type: Packers and SSSV MD (ft) and TVD (ft): 12. Attachments: Proposal Summary Wellbore schematic 13. Well Class after proposed work: Detailed Operations Program BOP Sketch Exploratory Stratigraphic Development Service 14. Estimated Date for 15. Well Status after proposed work: Commencing Operations: OIL WINJ WDSPL Suspended 16. Verbal Approval: Date: GAS WAG GSTOR SPLUG AOGCC Representative: GINJ Op Shutdown Abandoned Contact Name: Contact Email: Contact Phone: Authorized Title: Conditions of approval: Notify AOGCC so that a representative may witness Sundry Number: Plug Integrity BOP Test Mechanical Integrity Test Location Clearance Other Conditions of Approval: Post Initial Injection MIT Req'd? Yes No APPROVED BY Approved by: COMMISSIONER THE AOGCC Date: Comm. Comm. Sr Pet Eng Sr Pet Geo Sr Res Eng 3,784' main 21,740' main 3,868' main 745 NA Ryan Rupert Subsequent Form Required: Suspension Expiration Date: Will perfs require a spacing exception due to property boundaries? Current Pools: MPSP (psi): Plugs (MD): 17. I hereby certify that the foregoing is true and the procedure approved herein will not be deviated from without prior written approval. Authorized Name and Digital Signature with Date: Tubing Size: PRESENT WELL CONDITION SUMMARY AOGCC USE ONLY slotted Tubing Grade: Tubing MD (ft):Perforation Depth TVD (ft): STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS 20 AAC 25.280 ADL 0355024, 0373301, 0388583, 0390616, 0391283 211-058 main, 213-173 L1 NA OP09-S01L1 3800 Centerpoint Dr, Suite 1400 Anchorage, AK 99503 50-029-23448-00-00 / 60-00 Hilcorp Alaska, LLC Length Size Proposed Pools: 3,859' L1 21,460' L1 3,860' L1 SCHRADER BLUFF OIL SCHRADER BLUFF OIL NA 6.4#, L-80 TVD Burst 10,029 slotted MD 5,750psi 5,020psi 160' 2,159' 3,910' 160' 2,325' 3,868'5-1/2" mainbore 20" 13-3/8" 160' 9-5/8"13,195' 2,325' 907-777-8503 ryan.rupert@hilcorp.com Operations Manager November 7, 2025 21,460'8,818' 2-7/8" 3,860' Perforation Depth MD (ft): Slotted Liner NA and NA NA and NA 21,740' 13,195' 8,754' 5-1/2" lateral L1 Slotted Liner Form 10-403 Revised 06/2023 Approved application valid for 12 months from date of approval.Submit PDF to aogcc.permitting@alaska.gov Digitally signed by Sara Hannegan (2519) DN: cn=Sara Hannegan (2519) Date: 2025.10.29 14:19:41 - 08'00' Sara Hannegan (2519) OP09-S01 / L1 By Grace Christianson at 3:55 pm, Oct 29, 2025 325-671 SFD 10/30/2025 DSR-10/30/25MGR31OCT25 * BOPE pressure test to 2500 psi. 48 hour notice to AOGCC. 10-404 RUSH 10/31/25 ESP Swap RWO Well: OP09 Well Name:OP09 API Number:50-029-23448-60-00 Current Status:ESP producer Permit to Drill Number:213-173 First Call Engineer:Ryan Rupert (907) 301-1736 (c) Second Call Engineer:Keith Lopez (907) 903-5432 (c) Maximum Expected BHP:1100 psi @ 3,558’ TVD (6.1ppg) Mar-25 Pre-startup static (75 days SI) Max. Potential Surface Pressure: 745 psi Using 0.1 psi/ft Brief Well Summary OP09 is a dual lateral OA sand producer. It is currently showing performance issues, and likely needs an ESP swap. It passed an MIT of the 9-5/8” casing in 2024. The goal of this project is install a new ESP and return the well to full production Pertinent wellbore information: - Deviation: Goes >70 degrees at 3100’ MD - DLS: o Max DLS above top liner = 6.7 degrees / 100’ at 91940’ MD o DLS spike into 3-4 degrees / 100’ from top liner up to 10,200’ MD o Previous ESP was set from 10,000’ – 10,100’ MD -Last casing test: MIT of 9-5/8” casing PASSED to 2100psi down to LTP at 12,642’ MD on 2/29/24. - Pertinent History: o 2011: Drill and complete as single horizontal in OA sand. Installed TT-ESP (2.4 year run life) o 2014: Elective pull of ESP and added 2nd OA lateral (9.8 year run life) o Mar-2024: ESP swap with casing test (0.1 years) Found ESP parted at Intake Was set from 12572 – 12,654’ MD just above ToL. Was run through several 4 deg DLS Installed new 2-7/8” tubing (non-coated) o June-2024: ESP swap (0.6 years) Reran 2-7/8” tubing (non-coated) Moved back uphole to gentle DLS section o March-2025: ESP Swap (current install) Reran 2-7/8” tubing (non-coated) L1: Main: 50-029-23448-00-00 / 211-058 SFD L1: ESP Swap RWO Well: OP09 RWO Procedure 1. MIRU Nordic #4 2. Circulate / kill well: a. Work over fluid will be injection water (8.33ppg or heavier) b. Ensure any wellbore fluids are fully displaced with KWF either via circulation or bullheading c. Tubing volume = 58bbls d. IA to top liner = 873bbls 3. Set BPV/TWC, ND tree, NU BOP stack (see attached) a. Notify AOGCC 48 hours in advance for witness b. Test to 250psi Low /2,500psi High / 2,500psi Annular c. BOPE will be used as needed to circulate the well 4. Pull BPV/TWC 5. BOLDS and unseat hanger 6. POOH laying down 4-1/2” ESP completion 7. Pickup cleanout run (if necessary) 8. Cleanout casing and liner as deep as practical 9. Pickup and RIH with ESP completion a. Bottom ESP to be set at same location ±10,150’ MD b. New tubing will be ran (2-7/8”, 3-1/2”, or 4-1/2”. TBD) 10. Land ESP completion 11. Set BPV/TWC, ND BOP 12. NU tree and test, pull BPV/TWC 13. RDMO RWO crew and equipment Attachments: 1. Current Well Schematic 2. Proposed Well Schematic 3. BOP schematic Lubricate BPV if pressure suspected below. - mgr Nikaitchuq Field Well: OP09-S01/S01L1 Last Completed: 3/15/2025 PTD: 211-058 (Mainbore) / 213-173 (Lateral) API #: 50-029-23448-00-00 (Mainbore)/60-00 (Lateral) Casing 20” 13-3/8" 20" 9-5/8" Size ID Top Btm 20" N/A Surface 160' 13-3/8" 12.415" Surface 2,325' 13-3/8" 9-5/8"8.835” Surface 13,195' 5-1/2” 4.892” 12,986' 21,740' 5-12"4.950” 12,642' 21,460' 2-7/8"2.441” Surface 10,029' No Top MD TVD Inc ID OD 1 9,980' 3,542' 82 2.205" 3.325" 10,029' 3,549' 82 2.323" 5.130" 10,030' 3,549' 82 NA 5.380" 10,048' 3,551' 82 NA 5.380" 10,058' 3,553' 82 NA 5.380" 10,063' 3,553' 82 NA 5.130" 10,064' 3,554' 82 NA 5.130" 10,071' 3,555' 82 NA 5.130" 10,078' 3,556' 82 NA 5.620" 10,095' 3,558' 83 NA 4.500" 10,097' 3,558' 82 NA 6.625" 3 12,642' 3,870' 84 4.950" 5.5" 4 12,986' 3,902' 88 4.950" 5.5" 1 Item JEWELRY DETAIL 2.313" XN Nipple, 2.205" ID Discharge Head Lateral L1 Baker SLXP Liner Hanger/Packer Pump #2 Pump #1 Gas Separator Intake Upper Seal Lower Seal Motor Downhole Sensor Centralizer 2 30" hole, cement to surface Mainbore Baker SLXP Liner Hanger/Packer Schematic Dual Lateral Producer with ESP Lift 15.5#, L-80, Hyd 521 17#, L-80, Hyd 521 16" hole, Stg 1 – 430 bbls 10.7# ASL, Stg 2 – 75 bbls 12.5# DeepCrete 12-1/4" hole, 356 bbls 12.5# DeepCrete CASING DETAIL 40#, L-80, Hyd 563Intermediate Surface Conductor Type 68#, L-80, BTC 179#, X-65 2 Wt/ Grade/ Conn Tubing Production (OP09-S01L1) Production (OP09-S01) TUBING DETAIL 6.4#, L-80 CEMENT DETAIL Cement Details Hole MD 160' 2,340' 13,220' 3 HAL 5-1/2" Oil Swell Packers OA Sand 4 Lateral L1 5-1/2" Slotted liner to 21,460' MD/3,860' TVD, hole TD 21,465' MD 9-5/8" OA Sand Mainbore 5-1/2" Slotted liner to 21,740' MD/3,868' TVD, hole TD 22,370' MD ESP power, (2) 3/8" Chem Line 00070 degree inclination @ ~3,134' XN Last edited by: DH 4/8/2025 Nikaitchuq Field Last Completed: 3/15/2025 PTD: 211-058 (Mainbore) / 213-173 (Lateral) API #: 50-029-23448-00-00 (Mainbore)/60-00 (Lateral) Casing 20” 13-3/8" 20" 9-5/8" Size ID Top Btm 20" N/A Surface 160' 13-3/8" 12.415" Surface 2,325' 13-3/8" 9-5/8"8.835” Surface 13,195' 5-1/2” 4.892” 12,986' 21,740' 5-12"4.950” 12,642' 21,460' 2-7/8"2.441” Surface 10,029' No Top MD TVD Inc ID 1 ~10029 3,549' 82 NA 2 ~10097 3,558' 82 NA 3 12,642' 3,870' 84 4.950" 4 12,986' 3,902' 88 4.950" 1 2 Wt/ Grade/ Conn Tubing Production (OP09-S01L1) Production (OP09-S01) TUBING DETAIL 6.4#, 13Cr CEMENT DETAIL Cement Details Hole MD 160' 2,340' 13,220' 30" hole, cement to surface Mainbore Baker SLXP Liner Hanger/Packer OP09-S01 & L1 Proposed Schematic Dual Lateral Producer with ESP Lift 15.5#, L-80, Hyd 521 17#, L-80, Hyd 521 16" hole, Stg 1 – 430 bbls 10.7# ASL, Stg 2 – 75 bbls 12.5# DeepCrete 12-1/4" hole, 356 bbls 12.5# DeepCrete CASING DETAIL 40#, L-80, Hyd 563Intermediate Surface Conductor Type 68#, L-80, BTC 179#, X-65 Item ESP Top Lateral L1 Baker SLXP Liner Hanger/Packer ESP Bottom JEWELRY DETAIL 3 HAL 5-1/2" Oil Swell Packers OA Sand 4 Lateral L1 5-1/2" Slotted liner to 21,460' MD/3,860' TVD, hole TD 21,465' MD, drilled 2014 9-5/8" OA Sand Mainbore 5-1/2" Slotted liner to 21,740' MD/3,868' TVD, hole TD 22,370' MD, drilled 2011 ESP power, (1) 3/8" Chem Line Flatpack 00070 degree inclination @ ~3,134' OP09-S01 Proposed Schematic 10-28-2025 Last edited by: DH 10/29/2025 Nordic Rig 4 ARRS 5M Nordic Calista 02.24.2025 All Components 5,000 psi BLIND/SHEAR RAMS VBR RAMS CHOKE HCR MANUAL CHOKE KILL HCR INSIDE KILL3" 5,000 PSI WP KILL LINE Annular 2 7/8” x 5” VBR STATE OF ALASKA OIL AND GAS CONSERVATION COMMISSION BOPE Test Report for: Reviewed By: P.I. Suprv Comm ________NIKAITCHUQ OP09-S01L1 JBR 04/25/2025 MISC. INSPECTIONS: FLOOR SAFTY VALVES:CHOKE MANIFOLD:BOP STACK: ACCUMULATOR SYSTEM:MUD SYSTEM: P/F P/F P/FP/FP/F Visual Alarm QuantityQuantity Time/Pressure SizeQuantity Number of Failures:2 2-7/8" joint. B/S door seals FP-replaced for a pass. Mud cross manual choke failed. R/T not witnessed. Date/No. of failures reflects when I was on location (VBR's passed while I was on location; during a retest of a different component, the rams failed which was not witnessed). Test Results TEST DATA Rig Rep:Kelly/BorgenOperator:Hilcorp Alaska, LLC Operator Rep:Grubb/Smith Rig Owner/Rig No.:Nordic 4 PTD#:2131730 DATE:3/9/2025 Type Operation:WRKOV Annular: 250/5000Type Test:INIT Valves: 250/5000 Rams: 250/5000 Test Pressures:Inspection No:bopSAM250310183336 Inspector Austin McLeod Inspector Insp Source Related Insp No: INSIDE REEL VALVES: Quantity P/F (Valid for Coil Rigs Only) Remarks: Test Time 7 MASP: 966 Sundry No: 325-068 Control System Response Time (sec) Time P/F Housekeeping:P PTD On Location P Standing Order Posted P Well Sign P Hazard Sec.NA Test Fluid W Misc NA Upper Kelly 1 P Lower Kelly 1 P Ball Type 1 P Inside BOP 1 P FSV Misc 0 NA 14 PNo. Valves 1 PManual Chokes 1 PHydraulic Chokes 0 NACH Misc Stripper 0 NA Annular Preventer 1 13-5/8"P #1 Rams 1 B/S P #2 Rams 1 2-7/8"x5-1/2"P #3 Rams 0 NA #4 Rams 0 NA #5 Rams 0 NA #6 Rams 0 NA Choke Ln. Valves 1 3-1/8"F HCR Valves 2 3-1/8"P Kill Line Valves 2 3-1/8"P Check Valve 0 NA BOP Misc 1 Door Seal FP System Pressure P3050 Pressure After Closure P2100 200 PSI Attained P25 Full Pressure Attained P69 Blind Switch Covers:PAll stations Bottle precharge P Nitgn Btls# &psi (avg)P4@2650 ACC Misc NA0 P PTrip Tank P PPit Level Indicators P PFlow Indicator P PMeth Gas Detector P PH2S Gas Detector 0 NAMS Misc Inside Reel Valves 0 NA Annular Preventer P10 #1 Rams P6 #2 Rams P6 #3 Rams NA0 #4 Rams NA0 #5 Rams NA0 #6 Rams NA0 HCR Choke P1 HCR Kill P1 9 9 9 9 9999 9 9 9 9 9 7HVWFKDUWIRUIDLOHGPXGFURVVPDQXDOFKRNHDWWDFKHG B/S door seals FP Mud cross manual choke failed R/T not witnessed F FP #01&.BOVBM$IPLF3FUFTU/PSEJD /JLBJUDIVR014- 15% "0($$*OTQ3QUCPQ4". 1. Type of Request: Abandon Plug Perforations Fracture Stimulate Repair Well Operations shutdown Suspend Perforate Other Stimulate Pull Tubing Change Approved Program Plug for Redrill Perforate New Pool Re-enter Susp Well Alter Casing Other: ESP Swap 2.Operator Name: 4.Current Well Class:5.Permit to Drill Number: Exploratory Development 3. Address:Stratigraphic Service 6. API Number: 7. If perforating:8.Well Name and Number: What Regulation or Conservation Order governs well spacing in this pool? Yes No 9.Property Designation (Lease Number):10. Field: NIKAITCHUQ 11. Total Depth MD (ft): Total Depth TVD (ft): Effective Depth MD: Effective Depth TVD: Junk (MD): 22,370 NA Casing Collapse Structural Conductor Surface 260psi Intermediate 3,090psi Production slotted Production slotted Packers and SSSV Type: Packers and SSSV MD (ft) and TVD (ft): 12. Attachments: Proposal Summary Wellbore schematic 13. Well Class after proposed work: Detailed Operations Program BOP Sketch Exploratory Stratigraphic Development Service 14.Estimated Date for 15.Well Status after proposed work: Commencing Operations: OIL WINJ WDSPL Suspended 16. Verbal Approval: Date: GAS WAG GSTOR SPLUG AOGCC Representative: GINJ Op Shutdown Abandoned Contact Name: Contact Email: Contact Phone: Authorized Title: Conditions of approval: Notify AOGCC so that a representative may witness Sundry Number: Plug Integrity BOP Test Mechanical Integrity Test Location Clearance Other Conditions of Approval: Post Initial Injection MIT Req'd? Yes No APPROVED BY Approved by: COMMISSIONER THE AOGCC Date: Comm. Comm. Sr Pet Eng Sr Pet Geo Sr Res Eng NA and NA NA and NA NA 21,740' 13,195' 8,754' 5-1/2" lateral L1 Slotted Liner 907-777-8503 ryan.rupert@hilcorp.com Operations Manager February 27, 2025 21,460'8,818' 2-7/8" 3,860' Perforation Depth MD (ft): Slotted Liner 3,868'5-1/2" mainbore 20" 13-3/8" 160' 9-5/8"13,195' 2,325'5,020psi 160' 2,159' 3,910' 160' 2,325' L80 TVD Burst 9,915 slotted MD 5,750psi Hilcorp Alaska, LLC Length Size Proposed Pools: 3,784 21,740 3,868 966 SCHRADER BLUFF OIL SCHRADER BLUFF OIL STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS 20 AAC 25.280 ADL 0355024, 0373301, 0388583, 0390616, 0391283 213-173 C.O. 639 OP09-S01L1 3800 Centerpoint Dr, Suite 1400 Anchorage, AK 99503 50-029-23448-60-00 PRESENT WELL CONDITION SUMMARY AOGCC USE ONLY slotted Tubing Grade: Tubing MD (ft):Perforation Depth TVD (ft): Ryan Rupert Subsequent Form Required: Suspension Expiration Date: Will perfs require a spacing exception due to property boundaries? Current Pools: MPSP (psi): Plugs (MD): 17. I hereby certify that the foregoing is true and the procedure approved herein will not be deviated from without prior written approval. Authorized Name and Digital Signature with Date: Tubing Size: Form 10-403 Revised 06/2023 Approved application valid for 12 months from date of approval.Submit PDF to aogcc.permitting@alaska.gov 325-068 By Gavin Gluyas at 2:18 pm, Feb 10, 2025 Digitally signed by Sara Hannegan (2519) DN: cn=Sara Hannegan (2519) Date: 2025.02.10 13:35:31 - 09'00' Sara Hannegan (2519) 21,465' SFD 3,859 SFD SFD 2/17/2025 DSR-2/18/25 10-404 * BOPE test to 2500 psi. MGR04MAR2025*&: 3/4/2025Jessie L. Chmielowski Digitally signed by Jessie L. Chmielowski Date: 2025.03.04 14:16:05 -09'00' RBDMS JSB 030625 RWO Well: OP09-S01 Well Name:OP09-S01 API Number:50-029-23448-60-00 Current Status:Offline ESP producer Permit to Drill Number:213-173 First Call Engineer:Ryan Rupert (907) 301-1736 (c) Second Call Engineer:Keith Lopez (907) 903-5432 (c) Maximum Expected BHP:1320 psi @ 3,542’ TVD (7.2ppg) 3/1/24 static (3 mos SI) Max. Potential Surface Pressure: 966 psi Using 0.1 psi/ft Brief Well Summary OP09 is a dual lateral OA sand producer. It’s ESP failed in January-2025, and is ready for an ESP swap. It recently passed a casing MIT, and all that is needed during this RWO is a yo-yo of the ESP. The goal of this project is install a new / functional ESP and return the well to production Pertinent wellbore information: - Deviation o Goes >70 degrees at 3134’ MD o Sail angle: 83 degrees from 3400 – 12,800’ MD - DLS: all <2 degree / 100’ between 9,200’ – 10,100’ MD (don’t set ESP deeper than 10,100’ MD) -Last casing test: MIT of 9-5/8” casing PASSED from top liner (12,642’ MD) and above (2/9/24) - Pertinent History: o 2011: Drill and complete as single horizontal in OA sand o 2014: Upper lateral added in OA sand o March-2024: RWO ESP swap ƒ4 cleanout runs into 5-1/2” upper lateral ƒMade it 1600’ in ƒ1st 3 runs came back with 3.3bbls fill total (135’ in 5-1/2” liner) ƒ4th run came back almost empty ƒ9-5/8” casing MIT PASSED (see above) ƒNew ESP and new 2-7/8” tubing run o May-2024 RWO for ESP swap ƒ2 cleanout runs into upper 5-1/2” lateral ƒMade it 1000’ in ƒBoth runs came back empty ƒRun new ESP o 7/27/24: gauges die downhole o 1/2/25: ESP dies RWO Well: OP09-S01 RWO Procedure 1. MIRU Nordic #4 2. Circulate / kill well: a. Work over fluid will be injection water (8.5ppg) b. Ensure any wellbore fluids are fully displaced with KWF either via circulation or bullheading c. 130% Tubing volume = 75bbls d. 130% IA to ESP = 880bbls e. 130% 9-5/8” Casing below ESP = 300bbl 3. Set BPV/TWC, ND tree, NU BOP stack (see attached) a. Notify AOGCC 48 hours in advance for witness b. Test to 250psi Low /2,500psi High / 2,500psi Annular c. BOPE will be used as needed to circulate the well d. If this is the first well for Nordic 4 and this stack, BOPE will need to be tested to full rated working pressure 4. Pull BPV/TWC 5. BOLDS and unseat hanger 6. POOH laying down 2-7/8” ESP completion 7. Pickup ESP completion a. Bottom ESP to be set at same location ±9,985’ MD b. 2-7/8” Tubing will be re-used 8. Set BPV/TWC, ND BOP 9. NU tree and test, pull BPV/TWC 10. RDMO RWO crew and equipment Attachments: 1. Current Well Schematic 2. Proposed Well Schematic 3. BOP schematic Nikaitchuq Field Well: OP09-S01/S01L1 Last Completed: 6/3/2024 PTD: 211-058 (Mainbore) / 213-173 (Lateral) API #: 50-029-23448-00-00 (Mainbore)/60-00 (Lateral) Casing 20” 13-3/8" 20" 9-5/8" Size ID Top Btm 20" N/A Surface 160’ 13-3/8" 12.415" Surface 2,325' 13-3/8" 9-5/8" 8.835” Surface 13,195' 5-1/2” 4.892” 12,986' 21,740' 5-12" 4.950” 12,642' 21,460' 2-7/8" 2.441” Surface 9,915’ No Top MD TVD Inc ID OD 1 9,869' 3,525' 82 2.205" 3.325" 9,917' 3,532' 81 2.323" 5.130" 9,918' 3,532' 81 NA 5.380" 9,935' 3,535' 81 NA 5.380" 9,945' 3,536' 81 NA 5.380" 9,948'3,537' 82 NA 7.625" 9,951' 3,537' 82 NA 5.130" 9,952' 3,537' 82 NA 5.130" 9,959' 3,539' 82 NA 5.130" 9,965' 3,539' 82 NA 5.620" 9,982' 3,542' 82 NA 4.500" 9,985' 3,542' 82 NA 6.625" 3 12,642' 3,870' 84 4.950" 5.5" 4 12,986' 3,902' 88 4.950" 5.5" 1 Motor Centralizer 6.625" OD Sensor Downhole Zenith E7 Series 2 13,220' 30" hole, cement to surface 16" hole, Stg 1 – 430 bbls 10.7# ASL, Stg 2 – 75 bbls 12.5# DeepCrete 12-1/4" hole, 356 bbls 12.5# DeepCrete CASING DETAIL CEMENT DETAIL Cement Details Hole MD 160' 2,340' 40#, L-80, Hyd 563Intermediate Surface Conductor Type 68#, L-80, BTC 179#, X-65 JEWELRY DETAIL Intake Upper Seal Wt/ Grade/ Conn Tubing Production (OP09-S01L1) Production (OP09-S01) TUBING DETAIL 6.4#, L-80 Lateral L1 Baker SLXP Liner Hanger/Packer Mainbore Baker SLXP Liner Hanger/Packer 2 Schematic Dual Lateral Producer with ESP Lift 2-7/8" XN Nipple Discharge Head Pump #2 - PMP 538PMSXD FLEX27 82 FER H6 12CRC Pump #1- PMP 538PMSXD 20 GINPSHH H6 FER 12 CRC Gas Separator 7-5/8" Motor Shroud with hanger, overall length 42.76' with 5.76' below centalizer Lower Seal MOTOR 562XP 15.5#, L-80, Hyd 521 17#, L-80, Hyd 521 Item 3 HAL 5-1/2" Oil Swell Packers OA Sand 4 Lateral L1 5-1/2" Slotted liner to 21,460' MD/3,860' TVD, hole TD 21,465' MD 9-5/8" OA Sand Mainbore 5-1/2" Slotted liner to 21,740' MD/3,868' TVD, hole TD 22,370' MD ESP power, (2) 3/8" Chem Line 00070 degree inclination @ ~3,134' XN Last edited by: DH 2/6/2025 Nikaitchuq Field Well: OP09-S01/S01L1 Last Completed: 6/3/2024 PTD: 211-058 (Mainbore) / 213-173 (Lateral) API #: 50-029-23448-00-00 (Mainbore)/60-00 (Lateral) Casing 20” 13-3/8" 20" 9-5/8" Size ID Top Btm 20" N/A Surface 160’ 13-3/8" 12.415" Surface 2,325' 13-3/8" 9-5/8" 8.835” Surface 13,195' 5-1/2” 4.892” 12,986' 21,740' 5-12" 4.950” 12,642' 21,460' 2-7/8" 2.441” Surface 9,915’ No Top MD TVD Inc ID OD 1 ~9869 ~3524 ~82 2.205" 3.325" 2 ~9917 ~3532 ~81 2.323" 5.130" 3 12,642' 3,870' 84 4.950" 5.5" 4 12,986' 3,902' 88 4.950" 5.5" 1 3 HAL 5-1/2" Oil Swell Packers OA Sand 4 Lateral L1 5-1/2" Slotted liner to 21,460' MD/3,860' TVD, hole TD 21,465' MD 9-5/8" OA Sand Mainbore 5-1/2" Slotted liner to 21,740' MD/3,868' TVD, hole TD 22,370' MD Item JEWELRY DETAIL 2-7/8" XN Nipple ESP Components Lateral L1 Baker SLXP Liner Hanger/Packer Mainbore Baker SLXP Liner Hanger/Packer 2 Proposed Schematic Dual Lateral Producer with ESP Lift 15.5#, L-80, Hyd 521 17#, L-80, Hyd 521 Wt/ Grade/ Conn Tubing Production (OP09-S01L1) Production (OP09-S01) TUBING DETAIL 6.4#, L-80 CEMENT DETAIL Cement Details Hole MD 160' 2,340' 13,220' 30" hole, cement to surface 16" hole, Stg 1 – 430 bbls 10.7# ASL, Stg 2 – 75 bbls 12.5# DeepCrete 12-1/4" hole, 356 bbls 12.5# DeepCrete CASING DETAIL 40#, L-80, Hyd 563Intermediate Surface Conductor Type 68#, L-80, BTC 179#, X-65 ESP power, (2) 3/8" Chem Line 00070 degree inclination @ ~3,134' XN Last edited by: DH 2/6/2025 Nordic Rig #4 All 5000# Annular 2-7/8”–5” Superceded Nordic Rig 4 ARRS 5M Nordic Calista 02.24.2025 All Components 5,000 psi BLIND/SHEAR RAMS VBR RAMS CHOKE HCR MANUAL CHOKE 3" 5,000 PSI WP CHOKE LINEKILL HCR INSIDE KILL3" 5,000 PSI WP KILL LINE Annular 2 7/8” x 5” VBR Technical Report Title Date Client: ENI Petroleum Field: Nikaitchuq Rig: Nabors 245 Date: February 16, 2014 Surface Data Logging End of Well Report OP09-S1L1 OP09-S1L1 PB1 TABLE OF CONTENTS 1. General Information 2. Daily Summary 3. Days vs. Depth 4. After Action Review 5. Formation Tops 6. Mud Record 7. Bit Record 8. Morning Reports 9. Survey Report Digital Data to include: Final Log Files Final End of Well Report Final LAS Exports Halliburton Log Viewer EMF Log Viewer GENERAL WELL INFORMATION Company: ENI Petroleum Rig: Nabors 245 Well: OP09-S1L1 & OP09-S1L1 PB1 Field: Nikaitchuq Project Borough: North Slope Borough State: Alaska Country: United States API Number: 50-029-23448-60-00 (OP09-S1L1) 50-029-23448-70-00 (OP09-S1L1 PB1) Sperry Job Number: AK-XX-0901007074 Job Start Date: 29 December 2013 Spud Date: 12 January 2014 Total Depth: 21465’ MD, 3859’ TVD (OP09-S1L1) 17336’ MD, 3932’ TVD (OP09-S1L1 PB1) North Reference: True Declination: 19.570° Dip Angle: 81.023° Total Field Strength: 57627.325 nT Date Of Magnetic Data: 18 December 2013 Wellhead Coordinates N: North 70° 30' 39.72502" Wellhead Coordinates W: West 149° 51' 48.12714" Drill Floor Elevation 53.40’ Ground Elevation: 12.20’ Permanent Datum: Mean Sea Level SDL Engineers: Charles Sinn, Josiah Failing, Leif Hammes, Douglas Acker Company Geologist: Andrew Buchanan Company Representatives: Bruce Simonson / Ben Perry SSDS Unit Number: 121 DAILY SUMMARY 12/29/2013 SDL continues on location from previous well. Complete move and Rig Up over OP09-S1L1. Transfer production H2O into pits. Rig up to bullhead down well. 12/30/2013 Bullhead down completed to kill well. Nipple down Tree and Nipple up BOPs. BOP body test failed; well head fitting repaired. Second BOP test failed; a leak was found in the NT2 connection. 12/31/2013 Body test BOP to 2500 psi; lay down tools and Nipple down BOP. Attach elephant trunk to ESP sheave. Pull hanger and fill hole at 10 bbl/hr. 01/01/2014 Pick up Baker spear; pull VIT JT. Tong hydraulic failure, run up new set. Shear lower GLM, pump 100 bbls down annular. Trip out of hole with tubing to 5166’ MD. 01/02/2014 Continue to trip out with tubing to 2000 ft. Rig up slick line, pull slip stop, pull pack off and pump. Retrieve pump trip out to 1288’ MD.; wait on Phase 3 weather conditions. Trip out to surface. Load 4.5” drill pipe in shed; strap, tally, and prep for clean out run. Install and remove wear bushings. 01/03/2014 Continue to prep 4.5” drill pipe. Pick up cleanout BHA. Trip into hole with 4.5” drill pipe for cleanout run. 01/04/2014 Trip into hole, liner top found at 12988’ MD. Remove the ESP sheave/elephant trunk from derrick. Trip out and lay down clean out BHA. Pick up and trip in 5’’ drill pipe with Baker packer BHA. 01/05/2014 Continue to trip in and set packer at 12963’ MD. Packer failed bleed off test. Trip out of hole in singles then pump 100 barrels with no return. Trip out to surface; begin to prep for wire line. 01/06/2014 Completed wire line rig up. Run CBL; fluid level at 1500’ MD, TOC at 9150’ MD. Rig down wire line. Prepare milling BHA. 01/07/2014 Pick up and then rack milling BHA. Pressure tests the BOP. Pick up BHA and trip in with 4.5’’ drill pipe to 2250’ MD. Shallow hole test of MWD tools failed. 01/08/2014 Continue to trip into hole to 10800’ MD, MDW test still unsuccessful. Resume trip in, to 12966’ MD, attempt to circulate with no pressure and no returns. Trip out of hole, lay down BHA and rack milling assembly. 01/09/2014 Pick up a Baker test packer and trip in from surface with 5’’ drill pipe to 12031’ MD. 01/10/2014 Continue to trip in with test packer to 12963’ MD. Test at 500 psi for 5 minutes, then fill kill line and test backslide to 500 psi for 10 minutes. Trip out and lay down test packer. Pick up isolation packer and trip into hole with 5’’ drill pipe to 11748’ MD. 01/11/2014 Continue to trip in with isolation packer to 12963’ MD. Conduct pressure test and set packer at 12898’ MD. Trip out to surface and lay down packer tools. Pick up milling BHA and Whip-stock assembly. 01/12/2014 Pick up milling and Whip stock assembly. Trip in to 1504’ MD to condition mud and receive positive test from MWD tools. Continue to trip in to 12854’ MD. Milled window as per Baker rep, milled to 12835’ MD. Gas: There was a max gas of 5 units from 12835’ MD with an average drilling gas of 2 units. 01/13/2014 Complete window from 12827’ MD to 12843’ MD. Drilled rat hole to 12867’ MD; then tripped out to surface while installing Sliders on the stands. Lay down milling assembly. Gas: There was a max gas of 12 units from 12867’ MD with an average drilling gas of 6 units. 01/14/2014 Service the top drive, crown, and draw works. Pick up mud motor BHA for the build section. Trip in to hole, preform shallow MWD test, and continue to trip in to 12867’ MD. Rotate and slide drill from 12867’ MD to 13136’ MD, back ream when finished drilling. Gas: There was a max gas of 111 units from 13062’ MD with an average drilling gas of 33 units. 01/15/2014 Continue back ream from 12945’ MD to 12898’ MD @ 70 rpm, 2600 psi, and 12000 ft/lb torque. Orient to high side; pump off through window with no over pull. Circulated and conditioned before pumping dry-job, then trip out to surface. Lay down BHA before cut and slip job. Test BOPs. 01/16/2014 Pick up BHA #8 (bit, Xceed, Telescope, AND). Schlumberger attempted to load source but encountered problems. Trouble-shoot finding ice plug in tool. Trip in hole from 264' MD to 7872' MD, run in with 4.5" DP and perform Shallow Hole Test, fill every 30 stands. Trip in hole to 9202' MD and changed to elevators. Trip in hole 5" DP to 12742' MD. 20Klbs push to get through window. MAD pass from 13029’ MD to 13225’ MD. Rotary drill from 13136’ MD to 13575' MD. Currently drilling ahead. Gas: There was a Max Gas of 712 units from 13436' MD with an Average Gas of 329 units 01/17/2014 Rotary drilling from 13572' MD to 15236' MD at 500-550 gpm, Parameters of Torque =14-16K, Rpm =120, SPP= 2600-3150 psi. Currently drill ahead. Gas: There was a Max Gas of 818 units from 13940' MD with an Average Gas of 377 unit 01/18/2014 Rotary drilling from 15236' MD to 15705' MD, circulate and condition as per ENI due to Phase 3 weather conditions. Continue drilling ahead Gas: There was a Max Gas of 802 units from 16626' MD with an Average Gas of 461 units 01/19/2014 Rotary drilling from 16666' MD to 17336' MD, 3927' TVD; Pipe became stuck during a back ream. Continue to work stuck pipe but unsuccessful. Plan forward for wire line unit on location at 08:00 hours to retrieve nuclear source and attempt to free rest of BHA. Gas: There was a Max Gas of 635 units from 16706' MD with an Average Gas of 369 units 01/20/2014 Working stuck pipe, unsuccessful attempts to free the stuck pipe as per Co.Man and K&M rep. Rig up Schlumberger wireline to retrieve nuclear source. Start in hole, pump down at 7.5 bpm and 318 gpm, and 1700 psi. Wireline work believed to have latch up. Pull out of hole with source and secure. 01/21/2014 Continue jarring down as per company man and fishing rep. Start jarring up as per company man and fishing rep. Post-jar inspection of top drive and derrick. Continue jarring as per company man and fishing rep. No success. Trapped 11k ftlbs torque in string for back off as per Baker. Rig up wire line for string shot. Run in hole with wire line to 17167’ MD. Shoot at 17167’ MD. Trip out of hole with wire line. Rig down wire line to attempt to back off string. Currently rig down wire line. 01/22/2014 Finish rig down of wire line. Apply Reverse Torque to drill string to 13.6k. Rig up for String Shot #2 with 12strnd 960gr shot. Run in hole with wire line. Shot #2 while pumping 10bpm. Shot at 17139' MD. Trip out of hole with wire line. Jar Down with 14k torque per CoMan/Fishing Rep. Unsuccessful. Apply Reverse Torque to drill string to 14k. Set Slips to trap torque. Rig up for String Shot #3. Trip in hole with wire line. Shot #3 while pumping 10bpm. Run in hole with wire line at the time of the report. 01/23/2014 Trip in hole with wire line String Shot #3 to 16974' MD. Shot at 16974' MD with 10strnd, 800gr. Successful Break. Circulate bottoms up, pumped Dry Pill. Trip out of hole from 16936' MD to 12752' MD. Slip and Cut 98' drill line and perform Rig Service. Trip out of hole from 12752' MD to 11702' MD. Lay down 3rd Party Wire line Tools. Trip out of hole from 11702' MD to 9883' MD. Lay down Drill Pipe from 9883' MD to 8928' MD. 01/24/2014 Trip out of hole with 4.5" DP from 1775' MD to surface. Prepare Rig Floor for trip in hole. Pick up BHA #3. Trip in hole from 658' MD to 1890' MD. Perform Shallow Hole Test T/670psi. Trip out of hole for BOP Testing. Pick up Testing Tools. BOP PSI Test on 4.5" & 5" Test Joints and lay down Testing Tools. Pick up BHA #3 from Derrick Rack. Perform directional Work on MWD. Currently pick up BHA #3. 01/25/2014 Pick up BHA #3. Trip in hole from 278' MD to 1514' MD and perform shallow hole test. Trip in hole with 4.5" DP from 1514' MD to 9200' MD. Trip in hole with 5" DP from 13325' MD to 14001' MD. Wash and ream from 14001' MD to 16300' MD. Downlink with directional tools. Control drill open hole sidetrack from 16300' MD to 16380' MD @ 30 fph. Currently control drilling. Gas: There was a max gas while time drilling of 13 units from 16320' MD. 01/26/2014 Controlled drill from 16300' MD to 16387' MD as per DD at 30 ROP. Pull back to 16300' MD and control drill from 16300' MD to 16394' MD per DD at 15 ROP. Drill from 16394' MD to 17829' MD. Currently drill ahead. Gas: There was a max gas while drilling of 905u from 17690' MD with an Average Gas of 462 units 01/27/2014 Drill ahead from 17829' MD to 19488' MD at 400 gpm. Currently drill ahead. Gas: There was a max gas while drilling of 1005u from 17973' MD and an average gas of 502u. 01/28/2014 Drill from 19488' MD to 20700' MD at 400gpm. Currently drill ahead. Gas: There was a max gas while drilling of 788u from 19607' MD and an average gas of 447u. 01/29/2014 Drill from 20700' MD to TD at 21465' MD at 400 gpm. Circulate 3 bottoms up while back reaming out of the hole. Back ream out of hole 1 stand per bottoms up at 450 gpm. Back ream out of hole from 21465' MD to 20880' MD. Service rig, change out grabber box dies. Back ream out of hole from 20880' MD to 20319' MD. Currently back ream out of hole. Gas: There was a max gas while drilling of 739u from 20683' MD and an average gas of 469u. 01/30/2014 Back ream out of hole from 20319' MD to 13010' MD at 450 gpm. Trip out of hole through window from 13101' MD to 12815' MD with no pumps and no rotation. Back ream out of hole from 12815' MD to 11320' MD at 450 gpm. Continue to back ream out of hole until all 5" pipe is on surface. Currently back ream out of hole. Gas: There was a max gas while tripping of 36 units and an average gas of 21 units. 01/31/2014 Back ream out of hole from 11320' MD to 9408' MD at 450 gpm. Circulate 3 bottoms up at 1 stand per up at 450 gpm. Circulate until shakers are clean then slip and cut 118' drill line. Perform rig service. Trip out of hole sideways Lay down 4.5" drill pipe from 9217' MD to 278' MD. Lay down BHA #3. Pick up whipstock retrieval BHA. Gas: No significant gas to report. 02/01/2014 Pick up Whipstock retrieval BHA. Trip in hole to 1607' MD and shallow hole test. Trip in hole from 1607' MD to 12810' MD. Circulate and orientate tools. Hook into whipstock and release. Circulate bottoms up. Trip out of hole from 12810' MD to 155' MD with whipstock assembly. Lay down whipstock assembly. Rig up to run 5.5" slotted liner. Gas: No significant gas to report. 02/02/2014 Lay down BHA and clean rig floor. Pick up 5.5" liner tools. Run in hole with 5.5" liner to 8747' MD. Lay down Volant tools per GBR. Change out floor tools for Liner Hanger. Makeup hanger assembly. Run in hole to 8820' MD. 8820' MD. Trip in hole with 5.5" liner on 5" drill pipe from 8820' MD to 10700' MD. Currently run liner. Gas: No significant gas to report. 02/03/2014 Trip in hole with 5.5" liner on 5" drill pipe from 10700' MD to 12200' MD. Made everal attempts to enter window. Trip in hole on 5” from 12900' MD to 21460' MD. Start rotating string at 18800' MD. Tagged bottom at 21465' MD. Drop ball and seat ball at 1848 strokes. Displace wellbore from 8.7 ppg MOBM to 8.7 ppg KCl Brine at 4-7 bpm. Trip out of hole and lay down 5" drill pipe from 12631' MD to 7666' MD. Currently lay down drill pipe. Gas: There was a max gas of 34 units while displacing. 02/04/2014 Trip out of hole sideways from 7666' MD to 4644' MD and lay down 5" drill pipe. Service rig. Trip out of hole from 4644' MD to surface. Rig up to pull wear bushing. Pull wear bushing. Rig up to run 4.5" tubing and ESP. Currently rigging up. Gas: No significant gas. 02/05/2014 Run 4.5" tubing. Gas: No significant gas. 02/06/2014 Run 4.5" tubing. Rig down volant tool. Pick up and makeup hanger and landing joint. Currently rigging up hanger. Gas: No significant gas. 12000 13000 14000 15000 16000 17000 18000 19000 20000 21000 22000 23000 0 5 10 15 20 25 Me a s u r e d D e p t h Rig Days Prognosed Actual WELL NAME: OP09-S1L1 & OP09-S1L1 PB1 OPERATOR: Eni Petroleum MUD CO: MI Swaco RIG: Nabors 245E SPERRY JOB: AK-AM-0901007074 Days vs. Depth 04 April 2013 Sperry SDL Arrived on Location LOCATION: Nikaitchuq AREA: North Slope Borough STATE: Alaska SPUD: 12-Jan-2014 TD: 28-Jan-2014 Commenced Milling Window Hole Section On Bot: 19:35 12 Jan 2014 Stuck Pipe @ 17336' Jar/Fish Pipe, Plugback Hole Jan 19 - 24 2014 Commenced 8.75" Sidetrack Hole Section On Bot 21:00 25 Jan 2014 TD Production Hole Section 21465' MD, 3859' TVD Off Bot: 10:30 28 Jan 2014 WELL NAME:LOCATION:Nikaitchuq OPERATOR:AREA:North Slope Borough SPERRY JOB:STATE:Alaska RIG:Nabors 245E HOLE SECTION Production EMPLOYEE NAME:DATE: Sperry Drilling Confidential Document v 3.0 Eni Petroleum AK-AM-0900831473 Charles Sinn 6-Feb-2014 OP09-S1L1 What went as, or better than, planned: N/A Recommendations: Innovations and/or cost savings: This production drilling run was executed flawlessly without any issues at all. Difficulties experienced: All issues at oliktok point have been resolved. Proactive in troubleshooting to mitigate future problems. N/A Surface Data Logging After Action Review WELL NAME:OP09-S1L1 & OP09-S1L1 PB1 LOCATION:Nikaitchuq OPERATOR:Eni Petroleum AREA:North Slope MUD CO:MI Swaco STATE:Alaska RIG:Nabors 245E SPUD:12-Jan-2014 SPERRY JOB:AK-XX-0901007074 TD:28-Jan-2014 Marker MD INC AZ TVD TVDSS Shrader Bluff 10,643.0 81.4 354.2 3,626.7 -3,573.3 N Sequence Top 11,092.0 82.4 344.4 3,692.1 -3,638.7 N Sand Top 11,615.0 81.8 334.7 3,755.8 -3,702.4 N Bottom 12,017.0 83.2 326.5 3,804.0 -3,750.6 N Sequence Base 12,560.0 84.1 309.8 3,862.0 -3,808.6 Fault1 12,732.0 83.7 309.3 3,879.9 -3,826.5 OA-Sand Top 13,198.0 88.0 322.6 3,910.6 -3,857.2 OA-2 Top 13,959.0 89.2 313.6 3,923.2 -3,869.8 OA-2 Top 14,120.0 90.9 310.9 3,923.2 -3,869.8 OA-2 Top 14,357.0 88.7 304.8 3,923.2 -3,869.8 OA-3 Top 15,076.0 89.1 300.7 3,927.8 -3,874.4 OA-3 Top 15,551.0 92.8 298.2 3,928.1 -3,874.7 OA-2 Top 15,641.0 92.9 299.3 3,923.6 -3,870.2 OA-2 Top 16,369.0 89.0 304.3 3,922.9 -3,869.5 OA-3 Top 16,856.0 88.4 308.1 3,928.2 -3,874.8 Fault A 16,841.0 88.7 304.1 3,926.4 -3,883.0 OA-4 Top 17,146.0 89.4 298.1 3,944.6 -3,891.2 OA-4 Top 17,277.0 91.8 297.3 3,943.7 -3,890.3 OA-3 Top 18,159.0 91.8 299.5 3,920.3 -3,866.9 OA-2 Top 18,405.0 91.5 299.6 3,913.0 -3,859.6 OA-2 Top 19,125.0 90.2 302.1 3,904.3 -3,850.9 OA-3 Top 19,449.0 89.7 301.4 3,902.1 -3,848.7 OA-3 Top 20,509.0 92.5 304.4 3,873.8 -3,820.4 OA-2 Top 20,665.0 91.9 304.8 3,867.6 -3,814.2 OP-S1L1 PB1 Borehole Sidetrack Pt 16,300.0 90.0 302.9 3,921.9 -3,868.5 OA-2 16,844.0 89.2 299.7 3,924.1 -3,870.7 OA-3 16,965.0 87.6 300.3 3,926.6 -3,873.2 Formation Tops OP09-S1L1 & OP09-S1L1 PB1 Nikaitchuq Eni Petroleum North Slope Borough MI Swaco Alaska Nabors 245E 12-Jan-2014 AK-XX-0901007074 28-Jan-2014 Date Depth Wt Vis PV YP Gels HTHP R600/R300/R200/R100/R6 /R3 Cake Solids Oil/Water Alka POM Excess Lime Emul Stab ft - MD ppg sec lb/100 lb/100ft2 m/30m Rheometer 32nds %%%ppb volts 12-Jan 12828 8.70 48 17 16 8/9/9 4.8 50/33/26/18 /1 7.2 70 1.50 1.95 459.0 Milling Window 13-Jan 12867 8.70 49 17 17 8/8/9 4.8 51/34/28/21/8/7 /1 8.0 70 1.60 2.08 577.0 M/U BHA #1 14-Jan 13072 8.70 50 14 19 8/9/9 4.8 47/33/28/22/10/8 /1 7.5 69 1.70 2.21 605.0 Drill Build Section with Motor 15-Jan 13136 8.70 50 15 19 8/9/9 4.8 49/34/27/21 /1 8.0 70 1.70 2.21 595.0 BOP Test 16-Jan 13193 8.70 47 15 19 8/9/9 4.8 49/34/27/21/8/7 /1 8.3 69 1.75 2.28 611.0 Rotary Drill Lateral with BHA #2 17-Jan 15040 8.70 47 13 23 8/9/9 4.9 49/36/28/21/8/7 /1 9.0 70 2.90 3.77 594.0 Rotary Drill Lateral with BHA #2 18-Jan 16545 8.75 48 17 15 8/9/9 5.2 49/32/27/21/8/7 /1 9.5 71 2.50 3.25 544.0 Rotary Drill Lateral with BHA #2 19-Jan 17336 8.70 47 15 18 8/9/9 5.2 48/33/27/20/8/6 /1 9.1 70 1.90 2.47 544.0 Work Stuck Pipe 20-Jan 17336 8.75 49 15 19 8/9/9 5.2 49/34/28/21/8/7 /1 10.0 70 2.20 2.86 519.0 Wire Line POOH Nuclear Source 21-Jan 17336 8.75 51 13 22 8/8/9 5.0 48/35/27/20/8/7 /1 10.0 70 2.20 2.86 478.0 Rig Down Wireline 22-Jan 17336 8.70 53 13 21 8/8/9 4.8 47/34/27/21/8/7 /1 10.0 71 2.25 2.93 557.0 RIH with Wireline 23-Jan 17336 8.75 55 15 21 8/9/9 4.9 51/36/29/22/8/7 /1 10.0 71 2.05 2.67 544.0 TOOH with 16974' Twist Off Pipe 24-Jan 17336 8.90 60 15 21 8/8/9 4.2 51/36/29/22/8/7 /1 9.5 71 2.05 2.67 490.0 Prepare to TIH with BHA #3 Date Depth Wt Vis PV YP Gels HTHP R600/R300/R200/R100/R6 /R3 Cake Solids Oil/Water Alka POM Excess Lime Emul Stab Remarks ft - MD ppg sec lb/100 lb/100ft2 m/30m Rheometer 32nds %%ml ppb volts 25-Jan 17336 8.85 56 14 20 8/9/9 4.7 48/34/28/21 1 8.63 62 2.05 2.67 530 Control Drilling with BHA #3 26-Jan 17540 8.7 51 15 20 8/9/9 4.0 50/35/29/22/9/8 1 8.55 64 2.25 2.93 520 Rotary Drill Lateral with BHA #3 27-Jan 19365 8.7 47 14 16 7/7/8 5.4 44/30/25/19/8/ 7 1 7.66 71 2 2.6 460 Rotary Drill Lateral with BHA #3 28-Jan 20565 8.7 46 15 15 6/7/7 5.6 39/27/22/16/7/6 1 8.62 73 2 2.6 470 Rotary Drill Lateral with BHA #3 29-Jan 21465 8.75 46 13 14 7/7/8 5.6 40/27/22/16/7/6 1 8.58 66 1.75 2.28 485 BROOH t/window 30-Jan 21465 8.65 46 12 15 7/7/8 5.6 39/27/22/17/7/6 1 7.42 65 2 2.6 520 BROOH 31-Jan 21465 8.7 46 12 15 7/7/8 5.8 39/27/21/16/7/6 1 7.5 66 1.95 2.54 505 RIH t/pull whipstock 1-Feb 21465 8.7 45 12 15 7/7/8 5.8 39/27/22/16/7/6 1 9 66 2 2.6 500 R/U for 5.5" Liner 2-Feb 21465 8.7 27 -----------RIH w/5.5" Liner 3-Feb 21465 8.7 27 -----------TOOH L/D 5" DP Casing Record Remarks 20" Conductor @ 160' MD, 160'TVD 13 3/8" Casing @ 2325' MD, 2159'TVD 9.625" Casing to TOW @ 12827' MD, 3890'TVD 5.5" Liner @ 21465' MD, 3859'TVD LOCATION: AREA: STATE: SPUD: TD: WELL NAME: OPERATOR: MUD CO: RIG: SPERRY JOB: W a t e r a n d O i l B a s e d M u d R e c o r d BHA#SDL RUN #Bit #Bit Type Bit Size Depth In Depth Out Footage Bit Hours TFA AVG ROP WOB (max) RPM (max) SPP (max) FLOW GPM (max)Bit Grade Comments 1 400 1 Milled Tooth XR+8.75"`12867 13136 269'4.10 0.746 65.7 13.6 24 2275 444 1-1-WT-A-E-I-NO-BHA Drill window 2 500 2 MDSi616 Smith 8.75'13136 17335 4199 23.10 0.902 125.0 14.1 131 2352 444 -Stuck In Hole 3 600 3 MDSi616 Smith 8.75'16300 21465 5165 51.60 0.902 100.1 14 120 2200 450 1-1-WT-A-X-I-NO-TD Production TD WELL NAME:OP09-S1L1 & OP09-S1L1 PB1 LOCATION:Nikaitchuq OPERATOR:Eni Petroleum AREA:North Slope MUD CO: SPERRY JOB:AK-XX-0901007074 TD:28-Jan-2014 MI Swaco STATE:Alaska RIG:Nabors 245E SPUD:12-Jan-2014 B i t R e c o r d . . * 24 hr Recap: (max)(current) 0 0 Cly 0 Set AtSize Grade 907-685-1490Unit Phone: 0 Josiah Failing Maximum Report By:Logging Engineers:J. Failing / C. Sinn 0 0 Units* Casing Summary Lithology (%) 0 MBT 0' pH 0 0 0 Siltst SPP (psi) Gallons/stroke TFABit Type Depth 27 C-5nC-2 in Minimum Depth Time: 8.7 ppg. Bullhead down tubing. R/U to bullhead down annulus. - - - Max @ ft Current Date: Avg to0' Yesterday's Depth: Current Depth: 24 Hour Progress: Flow In (gpm) Flow In (spm) Gas Summary 0 0 0 (current) Simonson / Sherman ShClyst TuffGvlCoal cP Footage Ss (ppb Eq) C-1 C-5i AK-AM-0901007074 Bullhead Down Annulus PV 24 hr Max Weight 0 Hours C-3 00 CementChtSilt C-4i C-4n YP (lb/100ft2) 000 Brine Depth in / out Mud Type Lst Type Average Background (max)Trip Avg Min Comments RPM ECD (ppg) ml/30min Tools API FL Chromatograph (ppm) WOB 100% Gas In Air=10,000 UnitsConnection 0 No Gas readings. ConditionBit # 8.70 Size Job No.: Daily Charges: Total Charges: MWD Summary 96% Rig Activity: Nabors 245E Report For: Morning Report Report # 1 Customer: Well: Area: Location: Rig: OP09-S1L1 Eni Petroleum Nikaitchuq Field Oliktok Point ROP ROP (ft/hr) 4.23 @ Mud Data Depth 29-Dec-2013 12:00 AM Current Pump & Flow Data: Max 0 Chlorides mg/l 49500.00 Completed moving rig onto OP09-S1L1. R/U substructure, pits. Transfer 9.1 ppg brine f/ truck t/ pi ts. Dilute to Density (ppg) out (sec/qt) Viscosity Cor Solids % You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com) . . * 24 hr Recap:Completed bullheading to kill well. Monitor well. R/D Bullheading tools. N/D tree, N/U BOPs. Per form BOP body Density (ppg) out (sec/qt) Viscosity Cor Solids % Chlorides mg/l 49500.00 0 30-Dec-2013 12:00 AM Current Pump & Flow Data: Max ROP ROP (ft/hr) 4.23 @ Mud Data Depth Morning Report Report # 2 Customer: Well: Area: Location: Rig: OP09-S1L1 Eni Petroleum Nikaitchuq Field Oliktok Point Job No.: Daily Charges: Total Charges: MWD Summary 96% Rig Activity: Nabors 245E Report For: ConditionBit # 8.70 Size No Gas readings. 100% Gas In Air=10,000 UnitsConnection 0 Tools API FL Chromatograph (ppm) WOB Avg Min Comments RPM ECD (ppg) ml/30min Background (max)Trip Average Mud Type Lst Type Brine Depth in / out YP (lb/100ft2) 000 00 CementChtSilt C-4i C-4n 24 hr Max Weight 0 Hours C-3 Ss (ppb Eq) C-1 C-5i AK-AM-0901007074 L/D BOP Stack PV Footage Simonson / Sherman ShClyst TuffGvlCoal cP Gas Summary 0 0 0 (current) Avg to0' Yesterday's Depth: Current Depth: 24 Hour Progress: Flow In (gpm) Flow In (spm) - - - Max @ ft Current Date: Time: test, failed. Repaired wellhead fitting. Perform body test, failed. Found leak in NT2 connection. N/D BOP Stack. in Minimum Depth C-5nC-2 SPP (psi) Gallons/stroke TFABit Type Depth 27 MBT 0' pH 0 0 0 Siltst Units* Casing Summary Lithology (%) 00 0 907-685-1490Unit Phone: 0 Josiah Failing Maximum Report By:Logging Engineers:J. Failing / C. Sinn Set AtSize Grade (max)(current) 0 0 Cly 0 You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com) . . * 24 hr Recap: (max)(current) 0 0 Cly 0 Set AtSize Grade 907-685-1490Unit Phone: 0 Josiah Failing Maximum Report By:Logging Engineers:J. Failing / C. Sinn 0 0 Units* Casing Summary Lithology (%) 0 MBT 0' pH 0 0 0 Siltst SPP (psi) Gallons/stroke TFABit Type Depth 27 C-5nC-2 in Minimum Depth Time: catch curtain. R/U elephant trunk to ESP sheave. Thread pulling rope to ground level. P/U 3rd par ty tools to rig floor. N/D - - - Max @ ft Current Date: Avg to0' Yesterday's Depth: Current Depth: 24 Hour Progress: Flow In (gpm) Flow In (spm) Gas Summary 0 0 0 (current) Simonson / Sherman ShClyst TuffGvlCoal cP Footage Ss (ppb Eq) C-1 C-5i AK-AM-0901007074 Unseat Hanger PV 24 hr Max Weight 0 Hours C-3 00 CementChtSilt C-4i C-4n YP (lb/100ft2) 000 Brine Depth in / out Mud Type Lst Type Average Background (max)Trip Avg Min Comments RPM ECD (ppg) ml/30min Tools API FL Chromatograph (ppm) WOB 100% Gas In Air=10,000 UnitsConnection 0 No Gas readings. BOPs, R/U and open BPV, monitor well and pull BPV. R/U and pull hanger, well on vacuum. Fill 10 bb ls/hr. ConditionBit # 8.70 Size Job No.: Daily Charges: Total Charges: MWD Summary 96% Rig Activity: Nabors 245E Report For: Morning Report Report # 3 Customer: Well: Area: Location: Rig: OP09-S1L1 Eni Petroleum Nikaitchuq Field Oliktok Point ROP ROP (ft/hr) 4.23 @ Mud Data Depth 31-Dec-2013 12:00 AM Current Pump & Flow Data: Max 0 Chlorides mg/l 49000.00 N/U and test BOPs. Body test to 2500 psi. Test BOPs, annular. L/D test tool and blow down. Finis h R/D, install Density (ppg) out (sec/qt) Viscosity Cor Solids % You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com) . . * 24 hr Recap:P/U Baker spear to pull VIT JT. Speared and pulled VIT JT, L/D VIT. Tong hydraulic failure, R/D R/U new set. Density (ppg) out (sec/qt) Viscosity Cor Solids % Chlorides mg/l 46500.00 0 1-Jan-2014 12:00 AM Current Pump & Flow Data: Max ROP ROP (ft/hr) 4.23 @ Mud Data Depth Morning Report Report # 4 Customer: Well: Area: Location: Rig: OP09-S1L1 Eni Petroleum Nikaitchuq Field Oliktok Point Job No.: Daily Charges: Total Charges: MWD Summary 96% Rig Activity: Nabors 245E Report For: ConditionBit # 8.70 Size No Gas readings. annular. TOOH w/ tubing t/ 5166'. 100% Gas In Air=10,000 UnitsConnection 0 Tools API FL Chromatograph (ppm) WOB Avg Min Comments RPM ECD (ppg) ml/30min Background (max)Trip Average Mud Type Lst Type Brine Depth in / out YP (lb/100ft2) 000 00 CementChtSilt C-4i C-4n 24 hr Max Weight 0 Hours C-3 Ss (ppb Eq) C-1 C-5i AK-AM-0901007074 TOOH w/ Tubing PV Footage Simonson / Sherman ShClyst TuffGvlCoal cP Gas Summary 0 0 0 (current) Avg to0' Yesterday's Depth: Current Depth: 24 Hour Progress: Flow In (gpm) Flow In (spm) - - - Max @ ft Current Date: Time: TOOH f/ 9933' MD with tubing. Get cap line/ESP through sheives, TOOH w/ rubing. Shear lower GLM, pump 100 bbls down in Minimum Depth C-5nC-2 SPP (psi) Gallons/stroke TFABit Type Depth 27 MBT 0' pH 0 0 0 Siltst Units* Casing Summary Lithology (%) 00 0 907-685-1490Unit Phone: 0 Josiah Failing Maximum Report By:Logging Engineers:J. Failing / C. Sinn Set AtSize Grade (max)(current) 0 0 Cly 0 You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com) . . * 24 hr Recap: (max)(current) 0 0 Cly 0 Set AtSize Grade 907-685-1490Unit Phone: 0 Josiah Failing Maximum Report By:Logging Engineers:J. Failing / C. Sinn 0 0 Units* Casing Summary Lithology (%) 0 MBT 0' pH 0 0 0 Siltst SPP (psi) Gallons/stroke TFABit Type Depth 27 C-5nC-2 in Minimum Depth Time: tubing stop. RIH, retrieve pack off, RIH retrieve pump. TOOH w/ tubing t/ 1288' MD. Wait on weath er, Phase 3 conditions. TOOH No Gas Readings. - - - Max @ ft Current Date: Avg to0' Yesterday's Depth: Current Depth: 24 Hour Progress: Flow In (gpm) Flow In (spm) Gas Summary 0 0 0 (current) Simonson / Sherman ShClyst TuffGvlCoal cP Footage Ss (ppb Eq) C-1 C-5i AK-AM-0901007074 TOOH w/ Tubing PV 24 hr Max Weight 0 Hours C-3 00 CementChtSilt C-4i C-4n YP (lb/100ft2) 000 Brine Depth in / out Mud Type Lst Type Average Background (max)Trip Avg Min Comments RPM ECD (ppg) ml/30min Tools API FL Chromatograph (ppm) WOB 100% Gas In Air=10,000 UnitsConnection 0 set wear ring as per Vetco. Prep 4.5" DP and clean out run BHA. w/ tubing t/ surface. L/D 3rd party tools, stage equipment. Load 4.5" DP in shed. Strap and prep. Install/remove wear bushing ConditionBit # 8.70 Size Job No.: Daily Charges: Total Charges: MWD Summary 96% Rig Activity: Nabors 245E Report For: Morning Report Report # 5 Customer: Well: Area: Location: Rig: OP09-S1L1 Eni Petroleum Nikaitchuq Field Oliktok Point ROP ROP (ft/hr) 4.23 @ Mud Data Depth 2-Jan-2014 12:00 AM Current Pump & Flow Data: Max 0 Chlorides mg/l 46500.00 TOOH w/ tubing t/ 2000' MD. R.U Slick line to pull stop/pack off/pump. Slick line RIH, tag @ 1903'. RIH to retrieve Density (ppg) out (sec/qt) Viscosity Cor Solids % You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com) . . * 24 hr Recap:Continue prepping 4.5" DP. P/U cleanout BHA. P/U DP and RIH w/ cleanout BHA. Density (ppg) out (sec/qt) Viscosity Cor Solids % Chlorides mg/l 46500.00 0 3-Jan-2014 12:00 AM Current Pump & Flow Data: Max ROP ROP (ft/hr) 4.23 @ Mud Data Depth Morning Report Report # 6 Customer: Well: Area: Location: Rig: OP09-S1L1 Eni Petroleum Nikaitchuq Field Oliktok Point Job No.: Daily Charges: Total Charges: MWD Summary 96% Rig Activity: Nabors 245E Report For: ConditionBit # 8.70 Size No Gas Readings. 100% Gas In Air=10,000 UnitsConnection 0 Tools API FL Chromatograph (ppm) WOB Avg Min Comments RPM ECD (ppg) ml/30min Background (max)Trip Average Mud Type Lst Type Brine Depth in / out YP (lb/100ft2) 000 00 CementChtSilt C-4i C-4n 24 hr Max Weight 0 Hours C-3 Ss (ppb Eq) C-1 C-5i AK-AM-0901007074 RIH w/ Cleanout BHA PV Footage Simonson / Sherman ShClyst TuffGvlCoal cP Gas Summary 0 0 0 (current) Avg to0' Yesterday's Depth: Current Depth: 24 Hour Progress: Flow In (gpm) Flow In (spm) - - - Max @ ft Current Date: Time: in Minimum Depth C-5nC-2 SPP (psi) Gallons/stroke TFABit Type Depth 27 MBT 0' pH 0 0 0 Siltst Units* Casing Summary Lithology (%) 00 0 907-685-1490Unit Phone: 0 Josiah Failing Maximum Report By:Logging Engineers:J. Failing / D. Acker Set AtSize Grade (max)(current) 0 0 Cly 0 You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com) . . * 24 hr Recap: (max)(current) 0 0 Cly 0 Set AtSize Grade 907-685-1490Unit Phone: 0 Josiah Failing Maximum Report By:Logging Engineers:J. Failing / D. Acker 0 0 Units* Casing Summary Lithology (%) 0 MBT 0' pH 0 0 0 Siltst SPP (psi) Gallons/stroke TFABit Type Depth 27 C-5nC-2 in Minimum Depth Time: TOOH, change elevators/slips. L/D Baker clean out BHA, P/U Baker packer BHA. TIH w/ DP. - - - Max @ ft Current Date: Avg to0' Yesterday's Depth: Current Depth: 24 Hour Progress: Flow In (gpm) Flow In (spm) Gas Summary 0 0 0 (current) Simonson / Sherman ShClyst TuffGvlCoal cP Footage Ss (ppb Eq) C-1 C-5i AK-AM-0901007074 TIH w/ Drill Pipe PV 24 hr Max Weight 0 Hours C-3 00 CementChtSilt C-4i C-4n YP (lb/100ft2) 000 Brine Depth in / out Mud Type Lst Type Average Background (max)Trip Avg Min Comments RPM ECD (ppg) ml/30min Tools API FL Chromatograph (ppm) WOB 100% Gas In Air=10,000 UnitsConnection 0 No Gas Readings ConditionBit # 8.70 Size Job No.: Daily Charges: Total Charges: MWD Summary 96% Rig Activity: Nabors 245E Report For: Morning Report Report # 7 Customer: Well: Area: Location: Rig: OP09-S1L1 Eni Petroleum Nikaitchuq Field Oliktok Point ROP ROP (ft/hr) 4.23 @ Mud Data Depth 4-Jan-2014 12:00 AM Current Pump & Flow Data: Max 0 Chlorides mg/l 47000.00 P/U 4.5" DP. Found liner top @ 12988' MD. L/D 3rd party tools. Remove ESP sheaver/elephant trunk from derrick. Density (ppg) out (sec/qt) Viscosity Cor Solids % You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com) . . * 24 hr Recap:P/U 5" DP. Set packer @ 12963' MD. Seat ball. Attempt to test packer. Failed bleed off test. R/D packer testing Density (ppg) out (sec/qt) Viscosity Cor Solids % Chlorides mg/l 47000.00 0 5-Jan-2014 12:00 AM Current Pump & Flow Data: Max ROP ROP (ft/hr) 4.23 @ Mud Data Depth Morning Report Report # 8 Customer: Well: Area: Location: Rig: OP09-S1L1 Eni Petroleum Nikaitchuq Field Oliktok Point Job No.: Daily Charges: Total Charges: MWD Summary 96% Rig Activity: Nabors 245E Report For: ConditionBit # 8.70 Size No Gas Readings. top drive. Begin R/U for wireline. 100% Gas In Air=10,000 UnitsConnection 0 Tools API FL Chromatograph (ppm) WOB Avg Min Comments RPM ECD (ppg) ml/30min Background (max)Trip Average Mud Type Lst Type Brine Depth in / out YP (lb/100ft2) 000 00 CementChtSilt C-4i C-4n 24 hr Max Weight 0 Hours C-3 Ss (ppb Eq) C-1 C-5i AK-AM-0901007074 R/U for Wireline PV Footage Simonson / Sherman ShClyst TuffGvlCoal cP Gas Summary 0 0 0 (current) Avg to0' Yesterday's Depth: Current Depth: 24 Hour Progress: Flow In (gpm) Flow In (spm) - - - Max @ ft Current Date: Time: equipment. TOOH, L/D singles 5" DP. Pump 100 bbls, no returns. Blow down top drive. TOOH t/ surf ace. L/D BHA. Service in Minimum Depth C-5nC-2 SPP (psi) Gallons/stroke TFABit Type Depth 27 MBT 0' pH 0 0 0 Siltst Units* Casing Summary Lithology (%) 00 0 907-685-1490Unit Phone: 0 Josiah Failing Maximum Report By:Logging Engineers:J. Failing / D. Acker Set AtSize Grade (max)(current) 0 0 Cly 0 You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com) . . * 24 hr Recap: (max)(current) 0 0 Cly 0 Set AtSize Grade 907-685-1490Unit Phone: 0 Josiah Failing Maximum Report By:Logging Engineers:J. Failing / D. Acker 0 0 Units* Casing Summary Lithology (%) 0 MBT 0' pH 0 0 0 Siltst SPP (psi) Gallons/stroke TFABit Type Depth 27 C-5nC-2 in Minimum Depth Time: Prep whipstock BHA. - - - Max @ ft Current Date: Avg to0' Yesterday's Depth: Current Depth: 24 Hour Progress: Flow In (gpm) Flow In (spm) Gas Summary 0 0 0 (current) Simonson / Sherman ShClyst TuffGvlCoal cP Footage Ss (ppb Eq) C-1 C-5i AK-AM-0901007074 Prep Whipstock BHA PV 24 hr Max Weight 0 Hours C-3 00 CementChtSilt C-4i C-4n YP (lb/100ft2) 000 Brine Depth in / out Mud Type Lst Type Average Background (max)Trip Avg Min Comments RPM ECD (ppg) ml/30min Tools API FL Chromatograph (ppm) WOB 100% Gas In Air=10,000 UnitsConnection 0 No Gas Readings ConditionBit # 8.70 Size Job No.: Daily Charges: Total Charges: MWD Summary 96% Rig Activity: Nabors 245E Report For: Morning Report Report # 9 Customer: Well: Area: Location: Rig: OP09-S1L1 Eni Petroleum Nikaitchuq Field Oliktok Point ROP ROP (ft/hr) 4.23 @ Mud Data Depth 6-Jan-2014 12:00 AM Current Pump & Flow Data: Max 0 Chlorides mg/l 48000.00 Complete R/U wireline. Run wireline CBL. Fluid level @ 1500'. TOC @ 9150'. R/D wireline unit. S lip and cut. Density (ppg) out (sec/qt) Viscosity Cor Solids % You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com) . . * 24 hr Recap:Picked up milling BHA and racked back. Tested BOP's to 250psi low and 3500psi high. LD test tools; Picked up BHA Density (ppg) out (sec/qt) Viscosity Cor Solids % Chlorides mg/l 48000.00 0 7-Jan-2014 12:00 AM Current Pump & Flow Data: Max ROP ROP (ft/hr) 4.23 @ Mud Data Depth Morning Report Report # 9 Customer: Well: Area: Location: Rig: OP09-S1L1 Eni Petroleum Nikaitchuq Field Oliktok Point Job No.: Daily Charges: Total Charges: MWD Summary 96% Rig Activity: Nabors 245E Report For: ConditionBit # 8.70 Size No Gas Readings 100% Gas In Air=10,000 UnitsConnection 0 Tools API FL Chromatograph (ppm) WOB Avg Min Comments RPM ECD (ppg) ml/30min Background (max)Trip Average Mud Type Lst Type Brine Depth in / out YP (lb/100ft2) 000 00 CementChtSilt C-4i C-4n 24 hr Max Weight 0 Hours C-3 Ss (ppb Eq) C-1 C-5i AK-AM-0901007074 TIH w/ Whipstock PV Footage Simonson / Sherman ShClyst TuffGvlCoal cP Gas Summary 0 0 0 (current) Avg to0' Yesterday's Depth: Current Depth: 24 Hour Progress: Flow In (gpm) Flow In (spm) - - - Max @ ft Current Date: Time: assemble and TIH w/ Baker Whipstock. TIH with 4.5" DP f/157' t/2250'. Failed shallow hole test of M WD tool. in Minimum Depth C-5nC-2 SPP (psi) Gallons/stroke TFABit Type Depth 27 MBT 0' pH 0 0 0 Siltst Units* Casing Summary Lithology (%) 00 0 907-685-1490Unit Phone: 0 Douglas Acker Maximum Report By:Logging Engineers:D. Acker / L. Hammas Set AtSize Grade (max)(current) 0 0 Cly 0 You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com) . . * 24 hr Recap:Trip in hole F/2345' T10800' to attempt shallow hole. Unsuccessful test contiued TIH F/10800 T/12966 '. Circulated Density (ppg) out (sec/qt) Viscosity Cor Solids % Chlorides mg/l 47000.00 0 8-Jan-2014 12:00 AM Current Pump & Flow Data: Max ROP ROP (ft/hr) 4.23 @ Mud Data Depth Morning Report Report # 11 Customer: Well: Area: Location: Rig: OP09-S1L1 Eni Petroleum Nikaitchuq Field Oliktok Point Job No.: Daily Charges: Total Charges: MWD Summary 96% Rig Activity: Nabors 245E Report For: ConditionBit # 8.70 Size No Gas Readings assembly. 100% Gas In Air=10,000 UnitsConnection 0 Tools API FL Chromatograph (ppm) WOB Avg Min Comments RPM ECD (ppg) ml/30min Background (max)Trip Average Mud Type Lst Type Brine Depth in / out YP (lb/100ft2) 000 00 CementChtSilt C-4i C-4n 24 hr Max Weight 0 Hours C-3 Ss (ppb Eq) C-1 C-5i AK-AM-0901007074 TIH w/ Whipstock PV Footage Simonson / Sherman ShClyst TuffGvlCoal cP Gas Summary 0 0 0 (current) Avg to0' Yesterday's Depth: Current Depth: 24 Hour Progress: Flow In (gpm) Flow In (spm) - - - Max @ ft Current Date: Time: 70 bbls down hole and saw no pressure. TOOH F/ 12966 T2250'. L/D 4,5" singles F/ 1395' T/157". L/D B HA and racked back milling in Minimum Depth C-5nC-2 SPP (psi) Gallons/stroke TFABit Type Depth 27 MBT 0' pH 0 0 0 Siltst Units* Casing Summary Lithology (%) 00 0 907-685-1490Unit Phone: 0 Douglas Acker Maximum Report By:Logging Engineers:D. Acker / L. Hammas Set AtSize Grade (max)(current) 0 0 Cly 0 You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com) . . * 24 hr Recap: (max)(current) 0 0 Cly 0 Set AtSize Grade 907-685-1490Unit Phone: 0 Douglas Acker Maximum Report By:Logging Engineers:D. Acker / L. Hammas 0 0 Units* Casing Summary Lithology (%) 0 MBT 0' pH 0 0 0 Siltst SPP (psi) Gallons/stroke TFABit Type Depth 27 C-5nC-2 in Minimum Depth Time: TIH w/ 5' DP F/10698 T/12031. - - - Max @ ft Current Date: Avg to0' Yesterday's Depth: Current Depth: 24 Hour Progress: Flow In (gpm) Flow In (spm) Gas Summary 0 0 0 (current) Simonson / Sherman ShClyst TuffGvlCoal cP Footage Ss (ppb Eq) C-1 C-5i AK-AM-0901007074 TIH w/ new packer PV 24 hr Max Weight 0 Hours C-3 00 CementChtSilt C-4i C-4n YP (lb/100ft2) 000 Brine Depth in / out Mud Type Lst Type Average Background (max)Trip Avg Min Comments RPM ECD (ppg) ml/30min Tools API FL Chromatograph (ppm) WOB 100% Gas In Air=10,000 UnitsConnection 0 No Gas Readings ConditionBit # 8.70 Size Job No.: Daily Charges: Total Charges: MWD Summary 96% Rig Activity: Nabors 245E Report For: Morning Report Report # 12 Customer: Well: Area: Location: Rig: OP09-S1L1 Eni Petroleum Nikaitchuq Field Oliktok Point ROP ROP (ft/hr) 4.23 @ Mud Data Depth 9-Jan-2014 12:00 AM Current Pump & Flow Data: Max 0 Chlorides mg/l 47500.00 L/D whipstock BHA; Picked up Baker Retrievable packer. TIH w/ 5' DP F/21' T9780' ; TIH w/ 5" DP F/97 80' T/10698' Density (ppg) out (sec/qt) Viscosity Cor Solids % You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com) . . * 24 hr Recap:TIH to 12963' W/ packer. Test to 500 psi for 10 mins. Fill thru kill line, test backside to 500 psi. for 10 mins Density (ppg) out (sec/qt) Viscosity Cor Solids % Chlorides mg/l 47500.00 0 10-Jan-2014 12:00 AM Current Pump & Flow Data: Max ROP ROP (ft/hr) 4.23 @ Mud Data Depth Morning Report Report # 13 Customer: Well: Area: Location: Rig: OP09-S1L1 Eni Petroleum Nikaitchuq Field Oliktok Point Job No.: Daily Charges: Total Charges: MWD Summary 96% Rig Activity: Nabors 245E Report For: ConditionBit # 8.70 Size No Gas Readings 100% Gas In Air=10,000 UnitsConnection 0 Tools API FL Chromatograph (ppm) WOB Avg Min Comments RPM ECD (ppg) ml/30min Background (max)Trip Average Mud Type Lst Type Brine Depth in / out YP (lb/100ft2) 000 00 CementChtSilt C-4i C-4n 24 hr Max Weight 0 Hours C-3 Ss (ppb Eq) C-1 C-5i AK-AM-0901007074 TIH w/ new packer PV Footage Simonson / Sherman ShClyst TuffGvlCoal cP Gas Summary 0 0 0 (current) Avg to0' Yesterday's Depth: Current Depth: 24 Hour Progress: Flow In (gpm) Flow In (spm) - - - Max @ ft Current Date: Time: TOOH. Lay down packer. P/U DP. Picked up Isolation packer. TIH t/11748' in Minimum Depth C-5nC-2 SPP (psi) Gallons/stroke TFABit Type Depth 27 MBT 0' pH 0 0 0 Siltst Units* Casing Summary Lithology (%) 00 0 907-685-1490Unit Phone: 0 Douglas Acker Maximum Report By:Logging Engineers:D. Acker / L. Hammas Set AtSize Grade (max)(current) 0 0 Cly 0 You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com) . . * 24 hr Recap: (max)(current) 0 0 Cly 0 Set AtSize Grade 907-685-1490Unit Phone: 0 Douglas Acker Maximum Report By:Logging Engineers:D. Acker / L. Hammas 0 0 Units* Casing Summary Lithology (%) 0 MBT 0' pH 0 0 0 Siltst SPP (psi) Gallons/stroke TFABit Type Depth 27 C-5nC-2 in Minimum Depth Time: L/D BHA and packer setting tools. P/U BHA and Whipstock assembly. - - - Max @ ft Current Date: Avg to0' Yesterday's Depth: Current Depth: 24 Hour Progress: Flow In (gpm) Flow In (spm) Gas Summary 0 0 0 (current) Simonson / Sherman ShClyst TuffGvlCoal cP Footage Ss (ppb Eq) C-1 C-5i AK-AM-0901007074 P/U Whipstock BHA PV 24 hr Max Weight 0 Hours C-3 00 CementChtSilt C-4i C-4n YP (lb/100ft2) 000 Brine Depth in / out Mud Type Lst Type Average Background (max)Trip Avg Min Comments RPM ECD (ppg) ml/30min Tools API FL Chromatograph (ppm) WOB 100% Gas In Air=10,000 UnitsConnection 0 No Gas Readings ConditionBit # 8.70 Size Job No.: Daily Charges: Total Charges: MWD Summary 96% Rig Activity: Nabors 245E Report For: Morning Report Report # 14 Customer: Well: Area: Location: Rig: OP09-S1L1 Eni Petroleum Nikaitchuq Field Oliktok Point ROP ROP (ft/hr) 4.23 @ Mud Data Depth 11-Jan-2014 12:00 AM Current Pump & Flow Data: Max 0 Chlorides mg/l 47500.00 TIH w/ Isolation Packer f/11765' t/12963'. Pressure test and set packer at 12898'. TOOH f/12898' t/24' Density (ppg) out (sec/qt) Viscosity Cor Solids % You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com) . . * 24 hr Recap:P/U Milling and Whipstock assembly. TIH t/1504' and shallow hole test MWD. Circuate and condition th e mud Density (ppg) out (sec/qt) Viscosity Cor Solids % Chlorides mg/l 25500.00 0 12-Jan-2014 12:00 AM Current Pump & Flow Data: 1460 Max ROP ROP (ft/hr) 4.23 @ Mud Data Depth Morning Report Report # 14 Customer: Well: Area: Location: Rig: OP09-S1L1 Eni Petroleum Nikaitchuq Field Oliktok Point Job No.: Daily Charges: Total Charges: MWD Summary 96% Rig Activity: Nabors 245E Report For: ConditionBit # 7.28.708.70 Size There was a Max Gas of 5 units from 12835' MD with an Average Gas of 2 units milled window f/ 12828' t12835' 12828' 100% Gas In Air=10,000 Units0Connection 0 Tools HTHP FL Chromatograph (ppm) WOB Casing Avg Min Comments RPM ECD (ppg) ml/30min 0Background (max)Trip Average N/A Mud Type Lst Type Brine 4.812828'16 Depth in / out YP (lb/100ft2) 000 00 CementChtSilt C-4i C-4n 24 hr Max Weight 0 Hours C-3 Ss (ppb Eq) C-1 C-5i AK-AM-0901007074 Milling out window PV Footage Simonson / Sherman ShClyst TuffGvlCoal cP 17 Gas Summary 0 0 0 (current) Avg to0' Yesterday's Depth: Current Depth: 24 Hour Progress: 5.2 Flow In (gpm) Flow In (spm) 12828' 12835' 7' Max @ ft Current 12835'3.0 Date: Time: system. TIH f/1594'' t/4800' and then serviced the rig. Continued TIH f/4800' t/12854'. Oreintate Wh ipstock 15 degrees left and set. 3 in 0 12828'Minimum Depth C-5n 12835' 1.0 C-2 5 SPP (psi) Gallons/stroke TFABit Type Depth 48 MBT 0' pH 0 0 0 Siltst 423 100 Units* Casing Summary Lithology (%) 0425 0 907-685-1490Unit Phone: 0 Douglas Acker Maximum Report By:Logging Engineers:D. Acker / L. Hammas Set AtSize 40.0 Grade 9.63'' (max)(current) 0 0 Cly 752 You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com) . . * 24 hr Recap: (max)(current) 0 0 Cly 369 Set AtSize 40.0 Grade 9.63'' 907-685-1490Unit Phone: 0 Douglas Acker Maximum Report By:Logging Engineers:D. Acker / L. Hammas 227 0 423 100 Units* Casing Summary Lithology (%) 0 MBT 0' pH 0 0 0 Siltst SPP (psi) Gallons/stroke TFABit Type Depth 48 C-5n 12867' 0.0 C-2 12 in 0 12835'Minimum Depth Time: while installinf Sliders on stands 121-79. L/D Milling Assembly. 6 12835' 12867' 32' Max @ ft Current 12852'6.5 Date: Avg to0' Yesterday's Depth: Current Depth: 24 Hour Progress: 11.1 Flow In (gpm) Flow In (spm) Gas Summary 0 0 0 (current) Simonson / Sherman ShClyst TuffGvlCoal cP 17 Footage Ss (ppb Eq) C-1 C-5i AK-AM-0901007074 Milling out window PV 24 hr Max Weight 0 Hours C-3 00 CementChtSilt C-4i C-4n YP (lb/100ft2) 000 FazePro 4.812867'17 Depth in / out Mud Type Lst Type Average N/A0Background (max)Trip Avg Min Comments RPM ECD (ppg) ml/30min Tools HTHP FL Chromatograph (ppm) WOB Casing 100% Gas In Air=10,000 Units0Connection 0 There was a Max Gas of 12 units from 12867' MD with an Average Gas of 6 units 12828' ConditionBit # 8.08.708.70 Size Job No.: Daily Charges: Total Charges: MWD Summary 96% Rig Activity: Nabors 245E Report For: Morning Report Report # 16 Customer: Well: Area: Location: Rig: OP09-S1L1 Eni Petroleum Nikaitchuq Field Oliktok Point ROP ROP (ft/hr) 4.23 @ Mud Data Depth 13-Jan-2014 12:00 AM Current Pump & Flow Data: 1460 Max 0 Chlorides mg/l 25000.00 Cut and completed window f/12827' t12843'. Drilled rat hole f/12843' t12867'. TOOH f/12230' t/surfac e Density (ppg) out (sec/qt) Viscosity Cor Solids % You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com) . . * 24 hr Recap:L/D Mill BHA; Service top drive, crown, and draworks. P/U Mud Motor BHA for build section. TIH f/ 15 55' t11126' Density (ppg) out (sec/qt) Viscosity Cor Solids % Chlorides mg/l 30500.00 4 14-Jan-2014 12:00 AM Current Pump & Flow Data: 2275 Max ROP ROP (ft/hr) 4.23 @ Mud Data Depth Morning Report Report # 17 Customer: Well: Area: Location: Rig: OP09-S1L1 Eni Petroleum Nikaitchuq Field Oliktok Point Job No.: Daily Charges: Total Charges: MWD Summary 96% Rig Activity: Nabors 245E Report For: ConditionBit # 1 7.5 8.57" 8.70 Milled Tooth XR+ 8.70 Size There was a Max Gas of 111 units from 13062' MD with an Average Gas of 33 units 12828' 100% Gas In Air=10,000 Units0Connection 14 Tools HTHP FL Chromatograph (ppm) 13.612867' 13136' WOB Casing Avg Min Comments RPM ECD (ppg) ml/30min 29Background (max)Trip Average N/A Mud Type Lst Type 24.0 FazePro 4.813072'19 Depth in / out YP (lb/100ft2) 020 00 CementChtSilt C-4i C-4n 24 hr Max Weight 13 Hours C-3 Ss (ppb Eq) C-1 C-5i AK-AM-0901007074 TOOH for smart BHA PV 269' Footage 4.10 Simonson / Sherman ShClyst TuffGvlCoal cP 14 Gas Summary 0 9 4 (current) Avg to0' Yesterday's Depth: Current Depth: 24 Hour Progress: 83.3 Flow In (gpm) Flow In (spm) 12867' 13136' 269' Max @ ft Current 12933'171.0 Date: Time: preform shallow hole test and continue TIH t/12862'. Rotate and Slide drill f/12867' t/13136'. Back ream f/13132' t12945'. 33 in 0 12867'Minimum Depth C-5n 13062' 0.0 C-2 111 SPP (psi) Gallons/stroke TFABit Type Depth 50 MBT 0' pH 0.746 0 9 0 Siltst 444 104 Units* Casing Summary Lithology (%) 33762 0 907-685-1490Unit Phone: 0 Douglas Acker Maximum Report By:Logging Engineers:D. Acker / L. Hammes Set AtSize 40.0 Grade 9.63'' (max)(current) 58 0 Cly 13439 You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com) . . * 24 hr Recap: (max)(current) 0 0 Cly 0 Set AtSize 40.0 Grade 9.63'' 907-685-1490Unit Phone: 0 Douglas Acker Maximum Report By:Logging Engineers:D. Acker / L. Hammes 0 0 0 0 Units* Casing Summary Lithology (%) 0 MBT 0' pH 0.746 0 0 0 Siltst SPP (psi) Gallons/stroke TFABit Type Depth 50 C-5n 0' 0.0 C-2 0 No Gas Readings. in 0 0'Minimum Depth Time: T/12450 and orient to high side, pump off through window with no overpull. After window, pump out @ 100 gpm 0 13136' 13136' 0' Max @ ft Current 0'0.0 Date: Avg to0' Yesterday's Depth: Current Depth: 24 Hour Progress: 0.0 Flow In (gpm) Flow In (spm) Gas Summary 0 0 4 (current) Simonson / Sherman ShClyst TuffGvlCoal cP 15 269' 8.75 0.902 Footage 4.10 Ss (ppb Eq) C-1 C-5i AK-AM-0901007074 P/U BHA #2 Xceed PV 24 hr Max Weight 0 Hours C-3 00 CementChtSilt C-4i C-4n YP (lb/100ft2) 000 24.0 Smith MDSi616 FazePro 4.8 13136' 13136'19 Depth in / out Mud Type Lst Type Average N/A0Background (max)Trip Avg Min Comments RPM ECD (ppg) ml/30min Tools HTHP FL Chromatograph (ppm) 13.612867' 13136' WOB Casing 100% Gas In Air=10,000 Units0Connection 0 2 draw works and top drive.Test BOPs. taking returns to trip tank. L/D BHA & heavy wall before Cutting 120' drilling line, 16 wraps, adjus t brakes, serviced 380 psi. Circulated and Conditioned before pumping dry-job. Blow down top-drive and TOOH F/12450 T/1 078 12828' ConditionBit # 1 8.0 8.75" 8.70 Milled Tooth XR+ 8.70 Size Job No.: Daily Charges: Total Charges: MWD Summary 96% Rig Activity: Nabors 245E Report For: Morning Report Report # 18 Customer: Well: Area: Location: Rig: OP09-S1L1 Eni Petroleum Nikaitchuq Field Oliktok Point ROP ROP (ft/hr) 4.23 @ Mud Data Depth 15-Jan-2014 12:00 AM Current Pump & Flow Data: 0 Max 0 Chlorides mg/l 30500.00 Backreaming F/12945 T/12898 @ 70 rpm 500 gpm 2600 psi and TQ=12K. Reaming/Washing F/12898 Density (ppg) out (sec/qt) Viscosity Cor Solids % You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com) . . * 24 hr Recap:P/U BHA #8, bit, Xceed, Telescope, ADN, SLB attempted to load source but Replaced but still unsucces sful, Density (ppg) out (sec/qt) Viscosity Cor Solids % Chlorides mg/l 30250.00 72 16-Jan-2014 12:00 AM Current Pump & Flow Data: 3122 Max ROP ROP (ft/hr) 4.23 @ Mud Data Depth Morning Report Report # 19 Customer: Well: Area: Location: Rig: OP09-S1L1 Eni Petroleum Nikaitchuq Field Oliktok Point Job No.: Daily Charges: Total Charges: MWD Summary 96% Rig Activity: Nabors 245E Report For: Condition 1-1-WT-A-E-I-NO-BHA Bit # 1 8.3 8.75" 8.70 Milled Tooth XR+ 8.70 Size 2 T/13575'. 120 rpm, 550 gpm, 3200 psi, TQ=14.5, WOB=8K. Drilling Ahead T/9202' and changed elevators. 5" DP T/12742'. 20K to get through window. MadPass F/13029 T/13225. R otary drilling F/13136 12828' 100% Gas In Air=10,000 Units0Connection 113 Tools HTHP FL Chromatograph (ppm) 13.612867' 13136' WOB Casing Avg Min Comments RPM ECD (ppg) ml/30min 32Background (max)Trip Average 0 Mud Type Lst Type 24.0 Smith MDSi616 FazePro 4.8 13136' 13193'19 Depth in / out YP (lb/100ft2) 94319 06 CementChtSilt C-4i C-4n 24 hr Max Weight 252 Hours C-3 Ss (ppb Eq) C-1 C-5i AK-AM-0901007074 Drilling ahead PV 269' 8.75 0.902 Footage 4.10 Simonson / Sherman ShClyst TuffGvlCoal cP 15 Gas Summary 3 68 32 (current) Avg to0' Yesterday's Depth: Current Depth: 24 Hour Progress: 338.5 Flow In (gpm) Flow In (spm) 13136' 13572' 436' Max @ ft Current 13428'204.0 Date: Time: trouble-shoot finding ice plug in tool. TIH F/264' T/7872', run in with 4.5" and perform Shallow Hol e Test, fill every 30 stands. TIH 329 There was a Max Gas of 712 units from 13436' MD with an Average Gas of 329 units in 4 0'Minimum Depth C-5n 0' 261.0 C-2 712 SPP (psi) Gallons/stroke TFABit Type Depth 47 MBT 0' pH 0.746 5 70 5 Siltst 550 130 Units* Casing Summary Lithology (%) 4547347 523 907-685-1490Unit Phone: 16 Douglas Acker Maximum Report By:Logging Engineers:D. Acker / L. Hammes Set AtSize 40.0 Grade 9.63'' (max)(current) 386 6 Cly 73041 You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com) . . * 24 hr Recap: (max)(current) 504 53 Cly 93067 Set AtSize 40.0 Grade 9.63'' 907-685-1490Unit Phone: 32 Douglas Acker Maximum Report By:Logging Engineers:D. Acker / L. Hammes 40360 4500 516 122 Units* Casing Summary Lithology (%) 94 MBT 15236' pH 0.746 32 113 38 Siltst SPP (psi) Gallons/stroke TFABit Type Depth 47 C-5n 13940' 93.1 C-2 818 in 48 14850'Minimum Depth Time: 2600-3150 psi. Drilling ahead 377 There was a Max Gas of 818 units from 13940' MD with an Average Gas of 377 units 13572' 15236' 1664' Max @ ft Current 14680'185.7 Date: Avg to12136' Yesterday's Depth: Current Depth: 24 Hour Progress: 338.5 Flow In (gpm) Flow In (spm) Gas Summary 35 111 61 (current) Simonson / Sherman ShClyst TuffGvlCoal cP 13 269' 8.75 0.902 Footage 4.10 Ss (ppb Eq) C-1 C-5i AK-AM-0901007074 Drilling ahead PV 24 hr Max Weight 311 Hours C-3 2145 CementChtSilt C-4i C-4n YP (lb/100ft2) 349961 24.0 Smith MDSi616 FazePro 4.9 13136' 15040'23 Depth in / out Mud Type Lst Type Average N/A58Background (max)Trip 9.979.97 Avg Min Comments RPM ECD (ppg) ml/30min Tools Xceed 675, Telescope 825 HTHP FL Chromatograph (ppm) 13.612867' 13136' WOB Casing 100% Gas In Air=10,000 Units0Connection 152 2 12828' Condition 1-1-WT-A-E-I-NO-BHA Bit # 1 9.0 8.75" 8.75 Milled Tooth XR+ 8.75 Size Job No.: Daily Charges: Total Charges: MWD Summary 96% Rig Activity: 9.97 Nabors 245E Report For: Morning Report Report # 20 Customer: Well: Area: Location: Rig: OP09-S1L1 Eni Petroleum Nikaitchuq Field Oliktok Point ROP ROP (ft/hr) 4.23 @ Mud Data Depth 17-Jan-2014 12:00 AM Current Pump & Flow Data: 2837 Max 120 Chlorides mg/l 29500.00 Rotary drilling F/13572' T/15236' @ 500-550 gpm, TQ=14-16K, RPM=120, 2600-3150 psi. Drilling ahead Density (ppg) out (sec/qt) Viscosity Cor Solids % You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com) . . * 24 hr Recap:Rotary drilling F/15236' T/15705', circulate and condition as per ENI due to Phase 3 weather conditi ons. Density (ppg) out (sec/qt) Viscosity Cor Solids % Chlorides mg/l 29000.00 151 18-Jan-2014 12:00 AM Current Pump & Flow Data: 3280 Max ROP ROP (ft/hr) 4.23 @ Mud Data Depth Morning Report Report # 21 Customer: Well: Area: Location: Rig: OP09-S1L1 Eni Petroleum Nikaitchuq Field Oliktok Point Job No.: Daily Charges: Total Charges: MWD Summary 96% Rig Activity: 9.97 Nabors 245E Report For: Condition 1-1-WT-A-E-I-NO-BHA Bit # 1 9.5 8.75" 8.75 Milled Tooth XR+ 8.75 Size 2 12828' 100% Gas In Air=10,000 Units0Connection 195 Tools Xceed 675, Telescope 825 HTHP FL Chromatograph (ppm) 13.612867' 13136' WOB Casing 9.979.97 Avg Min Comments RPM ECD (ppg) ml/30min 58Background (max)Trip Average N/A Mud Type Lst Type 24.0 Smith MDSi616 FazePro 5.2 13136' 16545'15 Depth in / out YP (lb/100ft2) 3510562 2479 CementChtSilt C-4i C-4n 24 hr Max Weight 434 Hours C-3 Ss (ppb Eq) C-1 C-5i AK-AM-0901007074 Drilling ahead PV 269' 8.75 0.902 Footage 9.41 4.10 Simonson / Sherman ShClyst TuffGvlCoal cP 17 Gas Summary 47 152 88 (current) Avg to12136' Yesterday's Depth: Current Depth: 24 Hour Progress: 381.2 Flow In (gpm) Flow In (spm) 15236' 16705' 1469' Max @ ft Current 15627'212.9 Date: Time: Continue drilling ahead 461 There was a Max Gas of 802 units from 16626' MD with an Average Gas of 461 units in 69 16295'Minimum Depth C-5n 16626' 309.0 C-2 802 SPP (psi) Gallons/stroke TFABit Type Depth 48 MBT 16705' pH 0.746 91 148 76 Siltst 546 129 Units* Casing Summary Lithology (%) 10563584 14920 907-685-1490Unit Phone: 48 Douglas Acker Maximum Report By:Logging Engineers:D. Acker / L. Hammes Set AtSize 40.0 Grade 9.63'' (max)(current) 528 181 Cly 87876 You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com) . . * 24 hr Recap: (max)(current) 495 12 Cly 71327 Set AtSize 40.0 Grade 9.63'' 907-685-1490Unit Phone: 50 Douglas Acker Maximum Report By:Logging Engineers:D. Acker / L. Hammes 41456 1199 0 0 Units* Casing Summary Lithology (%) 103 MBT 17337' pH 0.746 10 153 18 Siltst SPP (psi) Gallons/stroke TFABit Type Depth 47 C-5n 16706' 0.0 C-2 635 in 8 16940'Minimum Depth Time: but unsuccessful. Plan for wireline unit on location at 08:00 hours to retrieve nuclear source and attempt to free rest of BHA. 369 There was a Max Gas of 635 units from 16706' MD with an Average Gas of 369 units 16705' 17337' 632' Max @ ft Current 17103'181.5 Date: Avg to12136' Yesterday's Depth: Current Depth: 24 Hour Progress: 397.0 Flow In (gpm) Flow In (spm) Gas Summary 18 157 93 (current) Simonson / Sherman ShClyst TuffGvlCoal cP 15 269' 8.75 0.902 Footage 29.31 4.10 Ss (ppb Eq) C-1 C-5i AK-AM-0901007074 Drilling ahead PV 24 hr Max Weight 280 Hours C-3 1321 CementChtSilt C-4i C-4n YP (lb/100ft2) 4111074 24.0 Smith MDSi616 FazePro 5.2 13136' 17336'18 Depth in / out Mud Type Lst Type Average N/A76Background (max)Trip 9.979.97 Avg Min Comments RPM ECD (ppg) ml/30min Tools Xceed 675, Telescope 825 HTHP FL Chromatograph (ppm) 13.612867' 13136' WOB Casing 100% Gas In Air=10,000 Units0Connection 197 2 12828' Condition 1-1-WT-A-E-I-NO-BHA Bit # 1 9.1 8.75" 8.70 Milled Tooth XR+ 8.70 Size Job No.: Daily Charges: Total Charges: MWD Summary 96% Rig Activity: 9.97 Nabors 245E Report For: Morning Report Report # 22 Customer: Well: Area: Location: Rig: OP09-S1L1 Eni Petroleum Nikaitchuq Field Oliktok Point ROP ROP (ft/hr) 4.23 @ Mud Data Depth 19-Jan-2014 12:00 AM Current Pump & Flow Data: 0 Max 110 Chlorides mg/l 28000.00 Rotary drilling F/16666' T/17336' TVD=3927'; Pipe became stuck during a back reem. Continue to work stuck pipe Density (ppg) out (sec/qt) Viscosity Cor Solids % You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com) . . * 24 hr Recap: Working stuck pipe, unsuccessful attempts to free the stuck pipe as per Co.Man and K&M rep Density (ppg) out (sec/qt) Viscosity Cor Solids % Chlorides mg/l 27500.00 110 20-Jan-2014 12:00 AM Current Pump & Flow Data: 0 Max ROP ROP (ft/hr) 4.23 @ Mud Data Depth Morning Report Report # 23 Customer: Well: Area: Location: Rig: OP09-S1L1 Eni Petroleum Nikaitchuq Field Oliktok Point Job No.: Daily Charges: Total Charges: MWD Summary 96% Rig Activity: 9.97 Nabors 245E Report For: Condition 1-1-WT-A-E-I-NO-BHA Bit # 1 10.0 8.75" 8.70 Milled Tooth XR+ 8.70 Size 2 line. POOH with source and secure. @ 7.5 bpm, 318 gpm, and 1700 psi. Wireline work believed to have latch up, POOH F/17180'md, R/D B/D cement 12828' 100% Gas In Air =10,000 Units 0Connection 197 Tools Xceed 675, Telescope 825 HTHP FL Chromatograph (ppm) 13.6 12867' 13136' WOB Casing 9.97 9.97 Avg Min Comments RPM ECD (ppg) ml/30min 0Background (max) Trip Average 0 Mud Type Lst Type 24.0 Smith MDSi616 FazePro 5.2 13136' 17336'19 Depth in / out YP (lb/100ft 2) 41 110 74 13 21 Cement Cht Silt C-4i C-4n 24 hr Max Weight 280 Hours C-3 Ss (ppb Eq) C-1 C-5i AK-AM-0901007074 Working stuck pipe PV 269' 8.75 0.902 Footage 29.31 4.10 Simonson / Sherman Sh Clyst Tuff Gvl Coal cP 15 Gas Summary 18 157 93 (current) Avg to 12136' Yesterday's Depth: Current Depth: 24 Hour Progress: 0.0 Flow In (gpm) Flow In (spm) 17337' 17337' 0' Max @ ft Current 0'0.0 Date: Time: 369 There is no gas to report at this time in 8 16940'Minimum Depth C-5n 16706' 0.0 C-2 635 SPP (psi) Gallons/stroke TFA Bit Type Depth 49 MBT 17337' pH 0.746 10 153 18 Siltst 0 0 Units* Casing Summary Lithology (%) 103 41456 1199 907-685-1490 Unit Phone: 50 Douglas Acker Maximum Report By: Logging Engineers: D. Acker / L. Hammes Set At Size 40.0 Grade 9.63'' (max) (current) 495 12 Cly 71327 . . * 24 hr Recap: (max) (current) 0 0 Cly 0 Set At Size 40.0 Grade 9.63'' 907-685-1490 Unit Phone: 0 Douglas Acker Maximum Report By: Logging Engineers: D. Acker / L. Hammes 0 0 0 0 Units* Casing Summary Lithology (%) 0 MBT 17337' pH 0.746 0 0 0 Siltst SPP (psi) Gallons/stroke TFA Bit Type Depth 51 C-5n 0' 0.0 C-2 0 in 0 0'Minimum Depth Time: 0 There is no gas to report at this time 17337' 17337' 0' Max @ ft Current 0'0.0 Date: Avg to 12136' Yesterday's Depth: Current Depth: 24 Hour Progress: 0.0 Flow In (gpm) Flow In (spm) Gas Summary 0 0 0 (current) Simonson / Sherman Sh Clyst Tuff Gvl Coal cP 13 269' 8.75 0.902 Footage 29.31 4.10 Ss (ppb Eq) C-1 C-5i AK-AM-0901007074 R/D wireline PV 24 hr Max Weight 0 Hours C-3 00 Cement Cht Silt C-4i C-4n YP (lb/100ft 2) 000 24.0 Smith MDSi616 FazePro 5.0 13136' 17336'22 Depth in / out Mud Type Lst Type Average 00Background (max) Trip 9.97 9.97 Avg Min Comments RPM ECD (ppg) ml/30min Tools Xceed 675, Telescope 825 HTHP FL Chromatograph (ppm) 13.6 12867' 13136' WOB Casing 100% Gas In Air =10,000 Units 0Connection 0 2 attempt Backoff of string. Rigging Down Wireline at the Report Time. R/U Wireline for String Shot. RIH w/ Wireline T/17167' MD. Shot at 17167' MD TOOH w/ Wireline. R/D Wireline to 12828' Condition 1-1-WT-A-E-I-NO-BHA Bit # 1 10.0 8.75" 8.75 Milled Tooth XR+ 8.75 Size Job No.: Daily Charges: Total Charges: MWD Summary 96% Rig Activity: 9.97 Nabors 245E Report For: Morning Report Report # 24 Customer: Well: Area: Location: Rig: OP09-S1L1 Eni Petroleum Nikaitchuq Field Oliktok Point ROP ROP (ft/hr) 4.23 @ Mud Data Depth 21-Jan-2014 12:00 AM Current Pump & Flow Data: 0 Max 0 Chlorides mg/l 29500.00 Continued Jarring Down per CM/Fishing Rep. Started Jarring Up per CM/Fishing Rep. Post-Jar Inspection of TDS Density (ppg) out (sec/qt) Viscosity Cor Solids % . . * 24 hr Recap: Finished R/D of Wireline. Applied Reverse Torque to DS to 13.6k. R/U for String Shot #2 w/ 12strnd 960gr shot Density (ppg) out (sec/qt) Viscosity Cor Solids % Chlorides mg/l 39000.00 0 22-Jan-2014 12:00 AM Current Pump & Flow Data: 0 Max ROP ROP (ft/hr) 4.23 @ Mud Data Depth Morning Report Report # 25 Customer: Well: Area: Location: Rig: OP09-S1L1 Eni Petroleum Nikaitchuq Field Oliktok Point Job No.: Daily Charges: Total Charges: MWD Summary 96% Rig Activity: 9.97 Nabors 245E Report For: Condition 1-1-WT-A-E-I-NO-BHA Bit # 1 10.0 8.75" 8.70 Milled Tooth XR+ 8.70 Size 2 R/U for String Shot #3. TIH w/ wireline Shot #3 while pumping 10bpm. RIH w/ Wireline at the time of the report. torque per CoMan/Fishing Rep Unsuccessful. Applied Reverse Torque to DS to 14k. Set Slips to trap torque. 12828' 100% Gas In Air =10,000 Units 0Connection 0 Tools Xceed 675, Telescope 825 HTHP FL Chromatograph (ppm) 13.6 12867' 13136' WOB Casing 9.97 9.97 Avg Min Comments RPM ECD (ppg) ml/30min 0Background (max) Trip Average 0 Mud Type Lst Type 24.0 Smith MDSi616 FazePro 4.8 13136' 17336'21 Depth in / out YP (lb/100ft 2) 000 00 Cement Cht Silt C-4i C-4n 24 hr Max Weight 0 Hours C-3 Ss (ppb Eq) C-1 C-5i AK-AM-0901007074 R/D wireline PV 269' 8.75 0.902 Footage 29.31 4.10 Simonson / Sherman Sh Clyst Tuff Gvl Coal cP 13 Gas Summary 0 0 0 (current) Avg to 12136' Yesterday's Depth: Current Depth: 24 Hour Progress: 0.0 Flow In (gpm) Flow In (spm) 17337' 17337' 0' Max @ ft Current 0'0.0 Date: Time: 0 There is no gas to report at this time in 0 0'Minimum Depth C-5n 0' 0.0 C-2 0 SPP (psi) Gallons/stroke TFA Bit Type Depth 53 MBT 17337' pH 0.746 0 0 0 Siltst 0 0 Units* Casing Summary Lithology (%) 00 0 907-685-1490 Unit Phone: 0 Douglas Acker Maximum Report By: Logging Engineers: D. Acker / L. Hammes Set At Size 40.0 Grade 9.63'' (max) (current) 0 0 Cly 0 . . * 24 hr Recap: (max) (current) 0 0 Cly 0 Set At Size 40.0 Grade 9.63'' 907-685-1490 Unit Phone: 0 Douglas Acker Maximum Report By: Logging Engineers: D. Acker / L. Hammes 0 0 0 0 Units* Casing Summary Lithology (%) 0 MBT 17337' pH 0.746 0 0 0 Siltst SPP (psi) Gallons/stroke TFA Bit Type Depth 55 C-5n 0' 0.0 C-2 0 in 0 0'Minimum Depth Time: 0 There is no gas to report at this time 17337' 17337' 0' Max @ ft Current 0'0.0 Date: Avg to 12136' Yesterday's Depth: Current Depth: 24 Hour Progress: 0.0 Flow In (gpm) Flow In (spm) Gas Summary 0 0 0 (current) Simonson / Sherman Sh Clyst Tuff Gvl Coal cP 15 269' 8.75 0.902 Footage 29.31 4.10 Ss (ppb Eq) C-1 C-5i AK-AM-0901007074 TOOH w/ Drill Pipe PV 24 hr Max Weight 0 Hours C-3 00 Cement Cht Silt C-4i C-4n YP (lb/100ft 2) 000 24.0 Smith MDSi616 FazePro 4.9 13136' 17336'21 N/A Depth in / out Mud Type Lst Type Average 00Background (max) Trip 9.97 9.97 Avg Min Comments RPM ECD (ppg) ml/30min Tools Xceed 675, Telescope 825 HTHP FL Chromatograph (ppm) 13.6 12867' 13136' WOB Casing 100% Gas In Air =10,000 Units 0Connection 0 2 MD. C/O to 4.5" tools. TOOH w/ 4.5" DP F/8928' T/1775' MD. Tripping Out @ Report Time. F/12752' T/11702' MD. L/D 3rd Party Wireline Tools. TOOH F/11702' T/9883' MD. L/D DP F/9883' T/8928' 12828' Condition 1-1-WT-A-E-I-NO-BHA Bit # 1 10.0 8.75" 8.75 Milled Tooth XR+ 8.75 Size Job No.: Daily Charges: Total Charges: MWD Summary 96% Rig Activity: 9.97 Nabors 245E Report For: Morning Report Report # 26 Customer: Well: Area: Location: Rig: OP09-S1L1 Eni Petroleum Nikaitchuq Field Oliktok Point Abandoned ROP ROP (ft/hr) 4.23 @ Mud Data Depth 23-Jan-2014 12:00 AM Current Pump & Flow Data: 0 Max 0 Chlorides mg/l 36000.00 TIH w/ Wirline String Shot #3 T/16974' MD. Shot @ 16974' MD w/ 10strnd, 800gr. Succesful Break. Circ Density (ppg) out (sec/qt) Viscosity Cor Solids % . . * 24 hr Recap: TOOH w/4.5" DP F/1775' T/Surface. Prep Rig Floor for TIH. P/U BHA #3. TIH F/658' T/1890' MD. Perform Density (ppg) out (sec/qt) Viscosity Cor Solids % Chlorides mg/l 39500.00 0 24-Jan-2014 12:00 AM Current Pump & Flow Data: 0 Max ROP ROP (ft/hr) 4.23 @ Mud Data Depth Morning Report Report # 27 Customer: Well: Area: Location: Rig: OP09-S1L1 Eni Petroleum Nikaitchuq Field Oliktok Point Job No.: Daily Charges: Total Charges: MWD Summary 96% Rig Activity: 9.97 Nabors 245E Report For: Condition Abandoned Bit # 2 9.5 8.75 8.90 Smith MDSi616 8.90 Size 3 MD. C/O to 4.5" tools. TOOH w/ 4.5" DP F/8928' T/1775' MD. Tripping Out @ Report Time. L/D Testing Tools. P/U BHA #3 F/Derrick Rack. Directional Work on MWD. Picking up BHA at the time of this report. 12828' 100% Gas In Air =10,000 Units 0Connection 0 Tools Xceed 675, Telescope 825 HTHP FL Chromatograph (ppm) 13136' N/A WOB Casing 9.97 9.97 Avg Min Comments RPM ECD (ppg) ml/30min 0Background (max) Trip Average 0 Mud Type Lst Type Smith MDSi616 FazePro 17336'21 Depth in / out YP (lb/100ft 2) 000 00 Cement Cht Silt C-4i C-4n 24 hr Max Weight 0 Hours C-3 Ss (ppb Eq) C-1 C-5i AK-AM-0901007074 TIH w/ BHA #3 PV 8.75 0.902 Footage 29.31 Simonson / Sherman Sh Clyst Tuff Gvl Coal cP 15 Gas Summary 0 0 0 (current) Avg to 12136' Yesterday's Depth: Current Depth: 24 Hour Progress: 0.0 Flow In (gpm) Flow In (spm) 17337' 17337' 0' Max @ ft Current 0'0.0 Date: Time: 0 There is no gas to report at this time in 0 0'Minimum Depth C-5n 0' 0.0 C-2 0 SPP (psi) Gallons/stroke TFA Bit Type Depth 60 MBT 17337' pH 0.902 0 0 0 Siltst 0 0 Units* Casing Summary Lithology (%) 00 0 907-685-1490 Unit Phone: 0 Douglas Acker Maximum Report By: Logging Engineers: D. Acker / L. Hammes Set At Size 40.0 Grade 9.63'' (max) (current) 0 0 Cly 0 . . * 24 hr Recap: (max)(current) 3 0 Cly 400 Set AtSize 40.0 Grade 9.63'' 907-685-1490Unit Phone: 0 Charles Sinn Maximum Report By:Logging Engineers:C. Sinn / J. Failing 0 190 453 107 Units* Casing Summary Lithology (%) 0 Oil / Water Akal 0.902 0 0 0 Siltst SPP (psi) Gallons/stroke TFABit Type Depth 2.256 C-5n 16320' 21.0 C-2 13 in 6 16302'Minimum Depth Time: from 1514' MD to 9200' MD. Trip in hole with 5" DP from 13325' MD to 14001' MD. Wash and ream from 14001' MD to 16300' MD. 10 There was a max gas while time drilling of 13 units from 16320' MD. 16300' 16384' 84' Max @ ft Current 16320'15.0 Date: Avg to16300' Yesterday's Depth: Current Depth: 24 Hour Progress: 23.0 Flow In (gpm) Flow In (spm) Gas Summary 0 0 0 (current) Simonson / Sherman ShClyst TuffGvlCoal cP 14 4200' 8.75 0.902 Footage 29.31 Ss Ratio C-1 C-5i AK-AM-0901007074 Openhole Sidetrack PV 24 hr Max Weight 0 Hours C-3 00 CementChtSilt C-4i C-4n YP (lb/100ft2) 2.05 000 120 Smith MDSi616 FazePro 4.7 @ 15017336'20 Depth in / out Mud Type Lst Type Average 5212Background (max)Trip 10.8210.90 Avg Min Comments Mud RPM ECD (ppg) ml/30min Tools Xceed 675, Periscope 675, Telescope 675 HTHP Fil Chromatograph (ppm) 1513136' 17336' WOB Casing 100% Gas In Air=10,000 Units0Connection 0 3 MD. C/O to 4.5" tools. TOOH w/ 4.5" DP F/8928' T/1775' MD. Tripping Out @ Report Time.Downlink with directional tools. Control drill open hole sidetrack from 16300' MD to 16380' MD @ 30 fph. Currently control drilling. 12828' Condition Abandoned Bit # 2 8.6 8.75 8.85 Smith MDSi616 8.85 Size Job No.: Daily Charges: Total Charges: MWD Summary 96% Rig Activity: 11.06 Nabors 245E Report For: Morning Report Report # 28 Customer: Well: Area: Location: Rig: OP09-S1L1 Eni Petroleum Nikaitchuq Field Oliktok Point ROP ROP (ft/hr) 4.23 @ Mud Data Depth 25-Jan-2014 12:00 AM Current Pump & Flow Data: 2509 Max 0 Chlorides mg/l 37500.00 Pick up BHA #3. Trip in hole from 278' MD to 1514' MD and perform shallow hole test. Trip in hole with 4.5" DP Density (ppg) out (sec/qt) Viscosity Cor Solids % . . * 24 hr Recap: (max)(current) 588 0 Cly 101842 Set AtSize 40.0 Grade 9.63'' 907-685-1490Unit Phone: 50 Charles Sinn Maximum Report By:Logging Engineers:C. Sinn / J. Failing 36914 433 406 96 Units* Casing Summary Lithology (%) 64 Oil / Water Akal 0.902 0 168 0 Siltst SPP (psi) Gallons/stroke TFABit Type Depth 2.451 C-5n 17690' 18.0 C-2 905 in 26 17602'Minimum Depth Time: 16300' MD to 16394' MD per DD at 15 ROP. Drill from 16394' MD to 17829' MD. Currently drill ahead. 398 There was a max gas while drilling of 905u from 17690' MD. 16384' 17829' 1445' Max @ ft Current 17934'121.0 Date: Avg to16300' Yesterday's Depth: Current Depth: 24 Hour Progress: 283.0 Flow In (gpm) Flow In (spm) Gas Summary 4 178 97 (current) Simonson / Sherman ShClyst TuffGvlCoal cP 15 4200' 8.75 0.902 Footage 29.31 Ss Ratio C-1 C-5i AK-AM-0901007074 Openhole Sidetrack PV 24 hr Max Weight 223 Hours C-3 05 CementChtSilt C-4i C-4n YP (lb/100ft2) 2.25 186535 120 Smith MDSi616 FazePro 4.017540'20 Depth in / out Mud Type Lst Type Average 52108Background (max)Trip 10.6710.97 Avg Min Comments Mud RPM ECD (ppg) ml/30min Tools Xceed 675, Periscope 675, Telescope 675 HTHP Fil Chromatograph (ppm) 1513136' 17336' WOB Casing 100% Gas In Air=10,000 Units306Connection 225 3 MD. C/O to 4.5" tools. TOOH w/ 4.5" DP F/8928' T/1775' MD. Tripping Out @ Report Time. 12828' Condition Abandoned Bit # 2 8.6 8.75 8.80 Smith MDSi616 8.70 Size Job No.: Daily Charges: Total Charges: MWD Summary 96% Rig Activity: 11.15 Nabors 245E Report For: Morning Report Report # 29 Customer: Well: Area: Location: Rig: OP09-S1L1 Eni Petroleum Nikaitchuq Field Oliktok Point ROP ROP (ft/hr) 4.23 @ Mud Data Depth 26-Jan-2014 12:00 AM Current Pump & Flow Data: 2172 Max 84 Chlorides mg/l 39000.00 Controlled drill from 16300' MD to 16387' MD as per DD at 30 ROP. Pull back to 16300' MD and control drill from Density (ppg) out (sec/qt) Viscosity Cor Solids % . . * 24 hr Recap:Drill ahead from 17829' MD to 19488' MD at 400 gpm. Currently drill ahead. Density (ppg) out (sec/qt) Viscosity Cor Solids % Chlorides mg/l 36500.00 132 27-Jan-2014 12:00 AM Current Pump & Flow Data: 2170 Max ROP ROP (ft/hr) 4.23 @ Mud Data Depth Morning Report Report # 30 Customer: Well: Area: Location: Rig: OP09-S1L1 Eni Petroleum Nikaitchuq Field Oliktok Point Job No.: Daily Charges: Total Charges: MWD Summary 96% Rig Activity: 10.98 Nabors 245E Report For: Condition Abandoned Bit # 2 7.7 8.75 8.75 Smith MDSi616 8.70 Size 3 MD. C/O to 4.5" tools. TOOH w/ 4.5" DP F/8928' T/1775' MD. Tripping Out @ Report Time. 12828' 100% Gas In Air=10,000 UnitsN/AConnection 256 Tools Xceed 675, Periscope 675, Telescope 675 HTHP Fil Chromatograph (ppm) 1513136' 17336' WOB Casing 10.7110.82 Avg Min Comments Mud RPM ECD (ppg) ml/30min 42Background (max)Trip Average N/A Mud Type Lst Type 120 Smith MDSi616 FazePro 5.4 16300' 19365'16 Depth in / out YP (lb/100ft2) 2.00 4112578 2960 CementChtSilt C-4i C-4n 24 hr Max Weight 299 Hours C-3 Ss Ratio C-1 C-5i AK-AM-0901007074 Drilling Production Lateral PV 4200' 8.75 0.902 Footage 29.31 Simonson / Sherman ShClyst TuffGvlCoal cP 14 Gas Summary 49 206 113 (current) Avg to16300' Yesterday's Depth: Current Depth: 24 Hour Progress: 234.0 Flow In (gpm) Flow In (spm) 17829' 19488' 1659' Max @ ft Current 19392'132.0 Date: Time: 502 There was a max gas while drilling of 1005u from 17973' MD and an average gas of 502u. in 48 19376'Minimum Depth C-5n 17973' 1.5 C-2 1005 SPP (psi) Gallons/stroke TFABit Type Depth 2.447 Oil / Water Akal 0.902 39 193 48 Siltst 406 96 Units* Casing Summary Lithology (%) 11353307 4577 907-685-1490Unit Phone: 58 Charles Sinn Maximum Report By:Logging Engineers:C. Sinn / J. Failing Set AtSize 40.0 Grade 9.63'' (max)(current) 663 46 Cly 110218 . . * 24 hr Recap: (max)(current) 423 68 Cly 93191 Set AtSize 40.0 Grade 9.63'' 907-685-1490Unit Phone: 48 Charles Sinn Maximum Report By:Logging Engineers:C. Sinn / J. Failing 47835 9041 406 96 Units* Casing Summary Lithology (%) 74 Oil / Water Akal 0.902 35 124 39 Siltst SPP (psi) Gallons/stroke TFABit Type Depth 73/2746 C-5n 19607' 170.0 C-2 788 in 42 20437'Minimum Depth Time: 447 There was a max gas while drilling of 788u from 19607' MD and an average gas of 447u. 19488' 20700' 1212' Max @ ft Current 20428'123.0 Date: Avg to16300' Yesterday's Depth: Current Depth: 24 Hour Progress: 232.0 Flow In (gpm) Flow In (spm) Gas Summary 37 140 88 (current) Simonson / Sherman ShClyst TuffGvlCoal cP 12 4200' 8.75 0.902 Footage 29.31 Ss Ratio C-1 C-5i AK-AM-0901007074 Drilling Production Lateral PV 24 hr Max Weight 225 Hours C-3 2247 CementChtSilt C-4i C-4n YP (lb/100ft2) 2.00 338759 120 Smith MDSi616 FazePro 5.6 16300' 20565'15 Depth in / out Mud Type Lst Type Average N/A40Background (max)Trip 10.6710.78 Avg Min Comments Mud RPM ECD (ppg) ml/30min Tools Xceed 675, Periscope 675, Telescope 675 HTHP Fil Chromatograph (ppm) 1513136' 17336' WOB Casing 100% Gas In Air=10,000 UnitsN/AConnection 160 3 MD. C/O to 4.5" tools. TOOH w/ 4.5" DP F/8928' T/1775' MD. Tripping Out @ Report Time. 12828' Condition Abandoned Bit # 2 8.6 8.75 8.75 Smith MDSi616 8.70 Size Job No.: Daily Charges: Total Charges: MWD Summary 96% Rig Activity: 11.02 Nabors 245E Report For: Morning Report Report # 31 Customer: Well: Area: Location: Rig: OP09-S1L1 Eni Petroleum Nikaitchuq Field Oliktok Point ROP ROP (ft/hr) 4.23 @ Mud Data Depth 28-Jan-2014 12:00 AM Current Pump & Flow Data: 2170 Max 89 Chlorides mg/l 37000 Drill from 19488' MD to 20700' MD at 400gpm. Currently drill ahead. Density (ppg) out (sec/qt) Viscosity Cor Solids % . . * 24 hr Recap:Drill from 20700' MD to TD at 21465' MD at 400 gpm. Circulate 3 bottoms up while back reaming out of the hole. Density (ppg) out (sec/qt) Viscosity Cor Solids % Chlorides mg/l 38000 116 29-Jan-2014 12:00 AM Current Pump & Flow Data: 2362 Max ROP ROP (ft/hr) 4.23 @ Mud Data Depth Morning Report Report # 32 Customer: Well: Area: Location: Rig: OP09-S1L1 Eni Petroleum Nikaitchuq Field Oliktok Point Job No.: Daily Charges: Total Charges: MWD Summary 96% Rig Activity: 11.02 Nabors 245E Report For: Condition Abandoned Bit # 2 8.6 8.75 8.75 Smith MDSi616 8.75 Size 3 MD. C/O to 4.5" tools. TOOH w/ 4.5" DP F/8928' T/1775' MD. Tripping Out @ Report Time.change out grabber box dies. Back ream out of hole from 20880' MD to 20319' MD. Currently back ream out of hole. 12828' 100% Gas In Air=10,000 UnitsN/AConnection 160 Tools Xceed 675, Periscope 675, Telescope 675 HTHP Fil Chromatograph (ppm) 1513136' 17336' WOB Casing 10.6610.81 Avg Min Comments Mud RPM ECD (ppg) ml/30min 24Background (max)Trip Average N/A Mud Type Lst Type 120 Smith MDSi616 FazePro 5.6 16300' 21465'14 21465' Depth in / out YP (lb/100ft2) 1.75 3710667 2455 CementChtSilt C-4i C-4n 24 hr Max Weight 272 Hours C-3 Ss Ratio C-1 C-5i AK-AM-0901007074 Drilling Production Lateral PV 4200' 8.75 0.902 Footage 5165' 29.31 Simonson / Sherman ShClyst TuffGvlCoal cP 13 Gas Summary 42 138 82 (current) Avg to16300' Yesterday's Depth: Current Depth: 24 Hour Progress: 232.0 Flow In (gpm) Flow In (spm) 20700' 21465' 765' Max @ ft Current 20428'123.0 Date: Time: Back ream out of hole 1 stand per bottoms up at 450 gpm. Back ream out of hole from 21465' MD to 20880' MD. Service rig, 469 There was a max gas while drilling of 739u from 20683' MD and an average gas of 469u. in 42 21241'Minimum Depth C-5n 20683' 170.0 C-2 739 SPP (psi) Gallons/stroke TFABit Type Depth 73/2746 Oil / Water 21465' Akal 0.902 40 122 43 Siltst 406 96 Units* Casing Summary Lithology (%) 9253260 7654 907-685-1490Unit Phone: 45 Charles Sinn Maximum Report By:Logging Engineers:C. Sinn / J. Failing Set AtSize 40.0 Grade 9.63'' (max)(current) 418 64 Cly 87638 . . * 24 hr Recap: (max)(current) Cly Set AtSize 40.0 Grade 9.63'' 907-685-1490Unit Phone:Charles Sinn Maximum Report By:Logging Engineers:C. Sinn / J. Failing 465 110 Units* Casing Summary Lithology (%) Oil / Water 21465' Akal 0.902 Siltst SPP (psi) Gallons/stroke TFABit Type Depth 71/2946 C-5n N/A C-2 36 in 4Minimum Depth Time: to 12815' MD with no pumps and no rotation. Back ream out of hole from 12815' MD to 11320' MD at 450 gpm. Continue to 21 There was a max gas while tripping of 36 units and an average gas of 21 units. 21465' 21465' 0' Max @ ft Current N/AN/A Date: Avg to16300' Yesterday's Depth: Current Depth: 24 Hour Progress: N/A Flow In (gpm) Flow In (spm) Gas Summary (current) Simonson / Sherman ShClyst TuffGvlCoal cP 12 4200' 8.75 0.902 Footage 5165' 29.31 Ss Ratio C-1 C-5i AK-AM-0901007074 Back Ream Out of Hole PV 24 hr Max Weight Hours C-3 CementChtSilt C-4i C-4n YP (lb/100ft2) 2.00 120 Smith MDSi616 FazePro 5.6 16300' 21465'15 21465' Depth in / out Mud Type Lst Type Average 3611Background (max)Trip 9.7210.23 Avg Min Comments Mud RPM ECD (ppg) ml/30min Tools Xceed 675, Periscope 675, Telescope 675 HTHP Fil Chromatograph (ppm) 1513136' 17336' WOB Casing 100% Gas In Air=10,000 UnitsN/AConnection 3 MD. C/O to 4.5" tools. TOOH w/ 4.5" DP F/8928' T/1775' MD. Tripping Out @ Report Time.back ream out of hole until all 5" pipe is on surface. Currently back ream out of hole. 12828' Condition Abandoned Bit # 2 7.4 8.75 8.70 Smith MDSi616 8.65 Size Job No.: Daily Charges: Total Charges: MWD Summary 96% Rig Activity: 10.62 Nabors 245E Report For: Morning Report Report # 33 Customer: Well: Area: Location: Rig: OP09-S1L1 Eni Petroleum Nikaitchuq Field Oliktok Point ROP ROP (ft/hr) 4.23 @ Mud Data Depth 30-Jan-2014 12:00 AM Current Pump & Flow Data: 1850 Max Chlorides mg/l 42000 Back ream out of hole from 20319' MD to 13010' MD at 450 gpm. Trip out of hole through window from 13101' MD Density (ppg) out (sec/qt) Viscosity Cor Solids % . . * 24 hr Recap: (max)(current) Cly Set AtSize 40.0 Grade 9.63'' 907-685-1490Unit Phone:Charles Sinn Maximum Report By:Logging Engineers:C. Sinn / J. Failing N/A N/A Units* Casing Summary Lithology (%) Oil / Water 21465' Akal 0.902 Siltst SPP (psi) Gallons/stroke TFABit Type Depth 73/2746 C-5n N/A C-2 in Minimum Depth Time: up at 450 gpm. Circulate until shakers are clean then slip and cut 118' drill line. Perform rig service. Trip out of hole sideways No significant gas to report. 21465' 21465' 0' Max @ ft Current N/AN/A Date: Avg to16300' Yesterday's Depth: Current Depth: 24 Hour Progress: N/A Flow In (gpm) Flow In (spm) Gas Summary (current) Simonson / Sherman ShClyst TuffGvlCoal cP 12 4200' 8.75 0.902 Footage 5165' 29.31 Ss Ratio C-1 C-5i AK-AM-0901007074 Pick up retrieval BHA PV 24 hr Max Weight Hours C-3 CementChtSilt C-4i C-4n YP (lb/100ft2) 1.95 120 Smith MDSi616 FazePro 5.8 16300' 21465'15 21465' Depth in / out Mud Type Lst Type Average Background (max)Trip 9.499.59 Avg Min Comments Mud RPM ECD (ppg) ml/30min Tools Xceed 675, Periscope 675, Telescope 675 HTHP Fil Chromatograph (ppm) 1513136' 17336' WOB Casing 100% Gas In Air=10,000 UnitsN/AConnection 3 MD. C/O to 4.5" tools. TOOH w/ 4.5" DP F/8928' T/1775' MD. Tripping Out @ Report Time.Lay down 4.5" drill pipe from 9217' MD to 278' MD. Lay down BHA #3. Pick up whipstock retrieval BHA. Currently pick up BHA. 12828' Condition Abandoned Bit # 2 7.5 8.75 8.70 Smith MDSi616 8.70 Size Job No.: Daily Charges: Total Charges: MWD Summary 96% Rig Activity: 9.89 Nabors 245E Report For: Morning Report Report # 34 Customer: Well: Area: Location: Rig: OP09-S1L1 Eni Petroleum Nikaitchuq Field Oliktok Point ROP ROP (ft/hr) 4.23 @ Mud Data Depth 31-Jan-2014 12:00 AM Current Pump & Flow Data: N/A Max Chlorides mg/l 40000 Back ream out of hole from 11320' MD to 9408' MD at 450 gpm. Circulate 3 bottoms up at 1 stand per bottoms Density (ppg) out (sec/qt) Viscosity Cor Solids % . . * 24 hr Recap:Pick up Whipstock retrieval BHA. Trip in hole to 1607' MD and shallow hole test. Trip in hole from 1607' MD Density (ppg) out (sec/qt) Viscosity Cor Solids % Chlorides mg/l 40000 1-Feb-2014 12:00 AM Current Pump & Flow Data: N/A Max 1-1-WT-A-X-I-NO-TD ROP ROP (ft/hr) 4.23 @ Mud Data Depth Morning Report Report # 35 Customer: Well: Area: Location: Rig: OP09-S1L1 Eni Petroleum Nikaitchuq Field Oliktok Point Job No.: Daily Charges: Total Charges: MWD Summary 96% Rig Activity: N/A Nabors 245E Report For: Condition Abandoned Bit # 2 7.5 8.75 8.70 Smith MDSi616 8.70 Size 3 MD. C/O to 4.5" tools. TOOH w/ 4.5" DP F/8928' T/1775' MD. Tripping Out @ Report Time.to 155' MD with whipstock assembly. Lay down whipstock assembly. Rig up to run 5.5" slotted liner. Currently liner rig up. 12828' 100% Gas In Air=10,000 UnitsN/AConnection Tools Xceed 675, Periscope 675, Telescope 675 HTHP Fil Chromatograph (ppm) 14 1513136' 17336' WOB Casing N/AN/A Avg Min Comments Mud RPM ECD (ppg) ml/30min Background (max)Trip Average Mud Type Lst Type 120 120 Smith MDSi616 FazePro 5.8 16300' 21465'15 21465' Depth in / out YP (lb/100ft2) 1.95 CementChtSilt C-4i C-4n 24 hr Max Weight Hours C-3 Ss Ratio C-1 C-5i AK-AM-0901007074 Rig up liner run PV 4200' 8.75 0.902 Footage 51.60 5165' 29.31 Simonson / Ruminer ShClyst TuffGvlCoal cP 12 Gas Summary (current) Avg to16300' Yesterday's Depth: Current Depth: 24 Hour Progress: N/A Flow In (gpm) Flow In (spm) 21465' 21465' 0' Max @ ft Current N/AN/A Date: Time: to 12810' MD. Circulate and orientate tools. Hook into whipstock and release. Circulate bottoms up. Trip out of hole from 12810' MD No significant gas to report. in Minimum Depth C-5n N/A C-2 SPP (psi) Gallons/stroke TFABit Type Depth 73/2746 Oil / Water 21465' Akal 0.902 Siltst N/A N/A Units* Casing Summary Lithology (%) 907-685-1490Unit Phone:Charles Sinn Maximum Report By:Logging Engineers:C. Sinn / J. Failing Set AtSize 40.0 Grade 9.63'' (max)(current) Cly . . * 24 hr Recap:Lay down BHA and clean rig floor. Pick up 5.5" liner tools. RIH with 5.5" liner to 8747' MD. Lay down Volant tools Density (ppg) out (sec/qt) Viscosity BH Temp (F) Chlorides mg/l 40000 2-Feb-2014 12:00 AM Current Pump & Flow Data: N/A Max 1-1-WT-A-X-I-NO-TD ROP ROP (ft/hr) 4.23 @ Mud Data Depth Morning Report Report # 36 Customer: Well: Area: Location: Rig: OP09-S1L1 Eni Petroleum Nikaitchuq Field Oliktok Point Job No.: Daily Charges: Total Charges: MWD Summary 96% Rig Activity: N/A Nabors 245E Report For: Condition Abandoned Bit # 2 111.0 8.75 8.70 Smith MDSi616 8.70 Size 3 MD. C/O to 4.5" tools. TOOH w/ 4.5" DP F/8928' T/1775' MD. Tripping Out @ Report Time.8820' MD. Trip in hole with 5.5" liner on 5" drill pipe from 8820' MD to 10700' MD. Currently running liner. 12828' 100% Gas In Air=10,000 UnitsN/AConnection Tools Xceed 675, Periscope 675, Telescope 675 HTHP Fil Chromatograph (ppm) 14 1513136' 17336' WOB Casing N/AN/A Avg Min Comments RPM ECD (ppg) ml/30min Background (max)Trip Average Mud Type Lst Type 120 120 Smith MDSi616 Brine 16300' 21465' 21465' Depth in / out YP (lb/100ft2) 0.00/0.95 CementChtSilt C-4i C-4n 24 hr Max Weight Hours C-3 Ss Ratio C-1 C-5i AK-AM-0901007074 Running Liner PV 4200' 8.75 0.902 Footage 51.60 5165' 29.31 Simonson / Ruminer ShClyst TuffGvlCoal cP Gas Summary (current) Avg to16300' Yesterday's Depth: Current Depth: 24 Hour Progress: N/A Flow In (gpm) Flow In (spm) 21465' 21465' 0' Max @ ft Current N/AN/A Date: Time: per GBR. Change out floor tools for Liner Hanger. Makeup hanger assembly. Run in hole to 8820' MD. Perform flow test at No significant gas to report. in Minimum Depth C-5n N/A C-2 SPP (psi) Gallons/stroke TFABit Type Depth 27 Oil / Water 21465' Pf/Mf 0.902 Siltst N/A N/A Units* Casing Summary Lithology (%) 907-685-1490Unit Phone:Charles Sinn Maximum Report By:Logging Engineers:C. Sinn / J. Failing Set AtSize 40.0 Grade 9.63'' (max)(current) Cly . . * 24 hr Recap: (max)(current) Liner Cly Set AtSize 40.0 Grade 9.63'' 907-685-1490Unit Phone:Charles Sinn Maximum Report By:Logging Engineers:C. Sinn / J. Failing 5.50'' N/A N/A Units* Casing Summary Lithology (%) Oil / Water 21465' Pf/Mf 0.902 Siltst SPP (psi) Gallons/stroke TFABit Type Depth 27 C-5n N/A C-2 in Minimum Depth Time: Trip in hole from 12900' MD to 21460' MD. Start rotating string at 18800' MD. Tagged bottom at 21465' MD. Drop ball and No significant gas to report. 21465' 21465' 0' Max @ ft Current N/AN/A Date: Avg to16300' Yesterday's Depth: Current Depth: 24 Hour Progress: N/A Flow In (gpm) Flow In (spm) Gas Summary (current) Simonson / Sherman ShClyst TuffGvlCoal cP 4200' 8.75 0.902 Footage 51.60 5165' 29.31 Ss Ratio C-1 C-5i AK-AM-0901007074 Laying down drillpipe PV 24 hr Max 28.0 Weight Hours C-3 CementChtSilt C-4i C-4n YP (lb/100ft2) 0.00/0.95 120 120 Smith MDSi616 Brine 16300' 21465' 21465' Depth in / out Mud Type Lst Type Average Background (max)Trip N/AN/A Avg Min Comments No problems running liner RPM ECD (ppg) ml/30min Tools Xceed 675, Periscope 675, Telescope 675 HTHP Fil Chromatograph (ppm) 14 1513136' 17336' WOB Casing 100% Gas In Air=10,000 UnitsN/AConnection 3 5" drill pipe from 12631' MD to 7666' MD. Currently laying down drill pipe. seat ball at 1848 strokes. Displace wellbore from 8.7 ppg MOBM to 8.7 ppg KCl Brine at 4-7 bpm. Trip out of hole and lay down 21465' 12828' Condition Abandoned Bit # 2 111.0 8.75 8.70 Smith MDSi616 8.70 Size Job No.: Daily Charges: Total Charges: MWD Summary 96% Rig Activity: N/A Nabors 245E Report For: Morning Report Report # 37 Customer: Well: Area: Location: Rig: OP09-S1L1 Eni Petroleum Nikaitchuq Field Oliktok Point 1-1-WT-A-X-I-NO-TD ROP ROP (ft/hr) 4.23 @ Mud Data Depth 3-Feb-2014 12:00 AM Current Pump & Flow Data: N/A Max Chlorides mg/l 40000 Trip in hole with 5.5" liner on 5" drill pipe from 10700' MD to 12200' MD. Several attempts to enter window. Density (ppg) out (sec/qt) Viscosity BH Temp (F) . . * 24 hr Recap:Trip out of hole sideways from 7666' MD to 4644' MD and lay down 5" drill pipe. Service rig. Trip out of hole from Density (ppg) out (sec/qt) Viscosity BH Temp (F) Chlorides mg/l 40000 4-Feb-2014 12:00 AM Current Pump & Flow Data: N/A Max 1-1-WT-A-X-I-NO-TD ROP ROP (ft/hr) 4.23 @ Mud Data Depth Morning Report Report # 38 Customer: Well: Area: Location: Rig: OP09-S1L1 Eni Petroleum Nikaitchuq Field Oliktok Point Job No.: Daily Charges: Total Charges: MWD Summary 96% Rig Activity: N/A Nabors 245E Report For: Condition Abandoned Bit # 2 111.0 8.75 8.70 Smith MDSi616 8.70 Size 3 21465' 12828' 100% Gas In Air=10,000 UnitsConnection Tools Xceed 675, Periscope 675, Telescope 675 HTHP Fil Chromatograph (ppm) 14 1513136' 17336' WOB Casing N/AN/A Avg Min Comments No problems running liner RPM ECD (ppg) ml/30min Background (max)Trip Average Mud Type Lst Type 120 120 Smith MDSi616 Brine 16300' 21465' 21465' Depth in / out YP (lb/100ft2) 0.00/0.95 CementChtSilt C-4i C-4n 24 hr Max 16.0 Weight Hours C-3 Ss Ratio C-1 C-5i AK-AM-0901007074 Rig up for 4.5" tubing PV 4200' 8.75 0.902 Footage 51.60 5165' 29.31 Simonson / Sherman ShClyst TuffGvlCoal cP Gas Summary (current) Avg to16300' Yesterday's Depth: Current Depth: 24 Hour Progress: N/A Flow In (gpm) Flow In (spm) 21465' 21465' 0' Max @ ft Current N/AN/A Date: Time: 4644' MD to surface. Rig up to pull wear bushing. Pull wear bushing. Rig up to run 4.5" tubing and ESP. Currently rigging up. No significant gas. in Minimum Depth C-5n N/A C-2 SPP (psi) Gallons/stroke TFABit Type Depth 27 Oil / Water 21465' Pf/Mf 0.902 Siltst 5.50'' N/A N/A Units* Casing Summary Lithology (%) 907-685-1490Unit Phone:Charles Sinn Maximum Report By:Logging Engineers:C. Sinn / J. Failing Set AtSize 40.0 Grade 9.63'' (max)(current) Liner Cly . . * 24 hr Recap: (max)(current) Liner Cly Set AtSize 40.0 Grade 9.63'' 907-685-1490Unit Phone:Charles Sinn Maximum Report By:Logging Engineers:C. Sinn / J. Failing 5.50'' N/A N/A Units* Casing Summary Lithology (%) Oil / Water 21465' Pf/Mf 0.902 Siltst SPP (psi) Gallons/stroke TFABit Type Depth 27 C-5n N/A C-2 8 in Minimum Depth Time: No significant gas. 21465' 21465' 0' Max @ ft Current N/AN/A Date: Avg to16300' Yesterday's Depth: Current Depth: 24 Hour Progress: N/A Flow In (gpm) Flow In (spm) Gas Summary (current) Simonson / Sherman ShClyst TuffGvlCoal cP 4200' 8.75 0.902 Footage 51.60 5165' 29.31 Ss Ratio C-1 C-5i AK-AM-0901007074 Run 4.5" tubing PV 24 hr Max 16.0 Weight Hours C-3 CementChtSilt C-4i C-4n YP (lb/100ft2) 0.00/0.95 120 120 Smith MDSi616 Brine 16300' 21465' 21465' Depth in / out Mud Type Lst Type Average Background (max)Trip N/AN/A Avg Min Comments No problems running liner RPM ECD (ppg) ml/30min Tools Xceed 675, Periscope 675, Telescope 675 HTHP Fil Chromatograph (ppm) 14 1513136' 17336' WOB Casing 100% Gas In Air=10,000 UnitsConnection 3 21465' 12828' Condition Abandoned Bit # 2 111.0 8.75 8.70 Smith MDSi616 8.70 Size Job No.: Daily Charges: Total Charges: MWD Summary 96% Rig Activity: N/A Nabors 245E Report For: Morning Report Report # 39 Customer: Well: Area: Location: Rig: OP09-S1L1 Eni Petroleum Nikaitchuq Field Oliktok Point 1-1-WT-A-X-I-NO-TD ROP ROP (ft/hr) 4.23 @ Mud Data Depth 5-Feb-2014 12:00 AM Current Pump & Flow Data: N/A Max Chlorides mg/l 40000 Run 4.5" tubing. Density (ppg) out (sec/qt) Viscosity BH Temp (F) . . * 24 hr Recap:Run 4.5" tubing. Rig down volant tool. Pick up and makeup hanger and landing joint. Currently rigging up hanger. Density (ppg) out (sec/qt) Viscosity BH Temp (F) Chlorides mg/l 40000 6-Feb-2014 12:00 AM Current Pump & Flow Data: N/A Max 1-1-WT-A-X-I-NO-TD ROP ROP (ft/hr) 4.23 @ Mud Data Depth Morning Report Report # 40 Customer: Well: Area: Location: Rig: OP09-S1L1 Eni Petroleum Nikaitchuq Field Oliktok Point Job No.: Daily Charges: Total Charges: MWD Summary 96% Rig Activity: N/A Nabors 245E Report For: Condition Abandoned Bit # 2 111.0 8.75 8.70 Smith MDSi616 8.70 Size 3 21465' 12828' 100% Gas In Air=10,000 UnitsConnection Tools Xceed 675, Periscope 675, Telescope 675 HTHP Fil Chromatograph (ppm) 14 1513136' 17336' WOB Casing N/AN/A Avg Min Comments No problems running liner RPM ECD (ppg) ml/30min Background (max)Trip Average Mud Type Lst Type 120 120 Smith MDSi616 Brine 16300' 21465' 21465' Depth in / out YP (lb/100ft2) 0.00/0.95 CementChtSilt C-4i C-4n 24 hr Max 16.0 Weight Hours C-3 Ss Ratio C-1 C-5i AK-AM-0901007074 Run 4.5" tubing PV 4200' 8.75 0.902 Footage 51.60 5165' 29.31 Simonson / Sherman ShClyst TuffGvlCoal cP Gas Summary (current) Avg to16300' Yesterday's Depth: Current Depth: 24 Hour Progress: N/A Flow In (gpm) Flow In (spm) 21465' 21465' 0' Max @ ft Current N/AN/A Date: Time: No significant gas. in Minimum Depth C-5n N/A C-2 SPP (psi) Gallons/stroke TFABit Type Depth 27 Oil / Water 21465' Pf/Mf 0.902 Siltst 5.50'' N/A N/A Units* Casing Summary Lithology (%) 907-685-1490Unit Phone:Charles Sinn Maximum Report By:Logging Engineers:C. Sinn / J. Failing Set AtSize 40.0 Grade 9.63'' (max)(current) Liner Cly WELL INFORMATION Created On : Mar 17 2014 Customer :Eni Petroleum Well Name :OP09-S1L1 Job Number :AK-XX-0901007074 Rig Name :Nabors 245E Field Name :Nikaitchuq Country :USA Survey Report Survey dataSURVEY HEADER Survey data provided by Schlumberger. DIRECTIONAL SURVEY DATA Tie-in 0.00 0.00 0.00 0.00 0.00 N 0.00 E (ft) Measured Depth DoglegVertical SectionDeparture (ft) Latitude (ft) Vertical Depth (deg) DirectionInclination (deg)(ft)(ft)(°/100') 41.20 0.05 55.16 41.20 0.01 N 0.01 E 0.01 0.12 166.34 0.19 55.16 166.34 0.16 N 0.23 E 0.16 0.11 201.91 0.08 16.03 201.91 0.22 N 0.29 E 0.22 0.39 262.65 0.07 36.21 262.65 0.29 N 0.32 E 0.29 0.05 322.70 0.04 57.52 322.70 0.33 N 0.36 E 0.33 0.06 382.81 0.31 21.75 382.81 0.49 N 0.44 E 0.49 0.46 473.14 0.85 3.07 473.13 1.39 N 0.56 E 1.39 0.63 535.14 1.57 11.30 535.12 2.68 N 0.75 E 2.68 1.19 628.15 4.04 32.75 628.01 6.69 N 2.78 E 6.69 2.84 725.17 6.80 28.36 724.59 14.62 N 7.35 E 14.62 2.87 820.74 9.92 20.12 819.14 27.33 N 12.88 E 27.33 3.49 916.22 14.09 24.33 912.51 45.65 N 20.50 E 45.65 4.46 1012.30 16.75 20.14 1,005.13 69.31 N 30.08 E 69.31 3.00 1107.61 20.37 14.56 1,095.47 98.27 N 38.99 E 98.27 4.23 1202.20 22.42 10.74 1,183.54 131.93 N 46.49 E 131.93 2.62 1264.76 23.40 10.62 1,241.17 155.86 N 51.00 E 155.86 1.57 1360.41 24.68 10.40 1,328.52 194.17 N 58.11 E 194.17 1.34 1457.59 25.72 10.06 1,416.45 234.89 N 65.45 E 234.89 1.08 1552.92 25.24 8.81 1,502.51 275.35 N 72.18 E 275.35 0.76 1649.17 24.62 7.89 1,589.79 315.48 N 78.07 E 315.48 0.76 1745.37 25.80 8.18 1,676.82 356.06 N 83.80 E 356.06 1.23 1841.25 26.95 8.29 1,762.72 398.21 N 89.90 E 398.21 1.20 1936.26 30.70 7.23 1,845.95 443.59 N 96.06 E 443.59 3.98 2032.39 32.32 6.85 1,927.90 493.45 N 102.22 E 493.45 1.70 2127.04 36.62 7.19 2,005.91 546.61 N 108.77 E 546.61 4.55 2223.33 38.94 5.90 2,082.01 605.21 N 115.48 E 605.21 2.55 2256.53 40.18 4.98 2,107.61 626.26 N 117.48 E 626.26 4.13 2325.00 42.25 4.24 2,159.11 671.22 N 121.10 E 671.22 3.11 2418.35 45.09 3.31 2,226.63 735.53 N 125.33 E 735.53 3.12 2513.83 50.08 2.18 2,291.01 805.92 N 128.68 E 805.92 5.30 2609.63 54.07 1.56 2,349.88 881.43 N 131.13 E 881.43 4.20 INSITE V8.0.20 Page 1Job No:AK-XX-0901007074 Well Name:OP09-S1L1 Survey Report DIRECTIONAL SURVEY DATA (ft) Measured Depth DoglegVertical SectionDeparture (ft) Latitude (ft) Vertical Depth (deg) DirectionInclination (deg)(ft)(ft)(°/100') 2706.46 57.93 2.02 2,404.02 961.65 N 133.64 E 961.65 4.01 2802.28 61.19 2.94 2,452.56 1,044.18 N 137.23 E 1044.18 3.50 2896.67 63.45 3.58 2,496.40 1,127.62 N 141.99 E 1127.62 2.47 2991.73 66.11 4.07 2,536.90 1,213.42 N 147.73 E 1213.42 2.84 3086.63 68.56 3.95 2,573.47 1,300.77 N 153.85 E 1300.77 2.58 3182.73 71.99 4.10 2,605.90 1,391.00 N 160.20 E 1391.00 3.57 3279.58 75.39 4.42 2,633.09 1,483.68 N 167.11 E 1483.68 3.52 3374.07 79.72 5.04 2,653.45 1,575.61 N 174.72 E 1575.61 4.63 3470.62 82.62 5.03 2,668.27 1,670.64 N 183.09 E 1670.64 3.00 3566.99 82.45 4.78 2,680.79 1,765.84 N 191.26 E 1765.84 0.31 3661.91 82.40 4.43 2,693.30 1,859.63 N 198.81 E 1859.63 0.37 3757.93 82.28 4.02 2,706.10 1,954.53 N 205.82 E 1954.53 0.44 3854.52 82.25 4.27 2,719.10 2,049.99 N 212.74 E 2049.99 0.26 3949.90 82.31 3.75 2,731.92 2,144.28 N 219.35 E 2144.28 0.54 4045.60 82.28 3.99 2,744.75 2,238.90 N 225.75 E 2238.90 0.25 4140.72 82.28 3.73 2,757.52 2,332.94 N 232.10 E 2332.94 0.27 4236.48 82.16 3.76 2,770.49 2,427.62 N 238.30 E 2427.62 0.13 4332.37 82.26 3.89 2,783.48 2,522.41 N 244.63 E 2522.41 0.17 4430.11 82.23 4.02 2,796.67 2,619.03 N 251.31 E 2619.03 0.14 4525.98 82.16 3.78 2,809.69 2,713.79 N 257.77 E 2713.79 0.26 4619.72 82.25 3.62 2,822.41 2,806.47 N 263.77 E 2806.47 0.19 4716.11 82.34 3.17 2,835.33 2,901.82 N 269.42 E 2901.82 0.47 4811.13 82.35 2.94 2,847.99 2,995.86 N 274.44 E 2995.86 0.24 4905.89 82.96 2.93 2,860.10 3,089.72 N 279.25 E 3089.72 0.64 5002.57 83.18 3.27 2,871.77 3,185.55 N 284.44 E 3185.55 0.42 5097.91 83.14 4.23 2,883.12 3,280.01 N 290.64 E 3280.01 1.00 5193.88 83.26 4.85 2,894.49 3,375.00 N 298.18 E 3375.00 0.65 5289.26 83.26 4.56 2,905.68 3,469.41 N 305.95 E 3469.41 0.30 5385.37 83.23 4.72 2,916.98 3,564.54 N 313.67 E 3564.54 0.17 5480.74 83.27 4.76 2,928.19 3,658.92 N 321.49 E 3658.92 0.06 5575.98 83.17 4.75 2,939.44 3,753.17 N 329.33 E 3753.17 0.11 5671.77 83.33 4.43 2,950.70 3,847.99 N 336.95 E 3847.99 0.37 5767.48 82.88 3.87 2,962.19 3,942.76 N 343.82 E 3942.76 0.75 5864.24 82.46 2.81 2,974.53 4,038.56 N 349.42 E 4038.56 1.17 5959.02 81.74 0.98 2,987.56 4,132.39 N 352.52 E 4132.39 2.06 6052.73 81.73 357.80 3,001.03 4,225.11 N 351.53 E 4225.11 3.36 6149.73 81.77 356.06 3,014.95 4,320.96 N 346.39 E 4320.96 1.78 6246.02 81.67 356.06 3,028.82 4,416.02 N 339.84 E 4416.02 0.10 6342.76 81.76 355.89 3,042.76 4,511.52 N 333.13 E 4511.52 0.20 6436.85 81.89 356.24 3,056.14 4,604.43 N 326.73 E 4604.43 0.39 6531.52 81.64 356.94 3,069.70 4,697.96 N 321.16 E 4697.96 0.78 6627.41 81.71 358.24 3,083.58 4,792.75 N 317.17 E 4792.75 1.34 6723.34 81.68 358.89 3,097.44 4,887.64 N 314.79 E 4887.64 0.67 6817.96 81.73 359.02 3,111.09 4,981.26 N 313.09 E 4981.26 0.15 6911.64 81.77 358.98 3,124.53 5,073.96 N 311.47 E 5073.96 0.06 INSITE V8.0.20 Page 2Job No:AK-XX-0901007074 Well Name:OP09-S1L1 Survey Report DIRECTIONAL SURVEY DATA (ft) Measured Depth DoglegVertical SectionDeparture (ft) Latitude (ft) Vertical Depth (deg) DirectionInclination (deg)(ft)(ft)(°/100') 7008.05 81.48 358.05 3,138.58 5,169.30 N 309.00 E 5169.30 1.00 7097.50 81.77 358.06 3,151.61 5,257.75 N 305.99 E 5257.75 0.32 7189.68 81.84 358.16 3,164.75 5,348.94 N 302.98 E 5348.94 0.13 7297.48 82.23 359.61 3,179.68 5,455.67 N 300.91 E 5455.68 1.38 7392.81 82.38 1.45 3,192.45 5,550.14 N 301.78 E 5550.14 1.92 7487.88 82.19 2.59 3,205.21 5,644.29 N 305.10 E 5644.29 1.20 7583.97 82.08 1.90 3,218.36 5,739.40 N 308.83 E 5739.40 0.72 7680.51 82.14 2.31 3,231.61 5,834.96 N 312.34 E 5834.96 0.43 7774.84 82.29 0.86 3,244.39 5,928.38 N 314.93 E 5928.38 1.53 7871.73 82.16 1.87 3,257.50 6,024.35 N 317.21 E 6024.35 1.04 7967.94 82.17 2.73 3,270.62 6,119.59 N 321.04 E 6119.59 0.89 8063.47 82.19 2.47 3,283.61 6,214.13 N 325.33 E 6214.13 0.27 8159.30 82.25 2.40 3,296.59 6,308.99 N 329.37 E 6308.99 0.10 8254.78 82.32 2.39 3,309.40 6,403.53 N 333.32 E 6403.53 0.07 8351.17 82.22 2.59 3,322.37 6,498.95 N 337.47 E 6498.95 0.23 8447.02 82.11 2.23 3,335.44 6,593.82 N 341.46 E 6593.82 0.39 8542.51 82.14 1.74 3,348.52 6,688.35 N 344.74 E 6688.35 0.51 8638.55 82.17 0.87 3,361.63 6,783.47 N 346.91 E 6783.47 0.90 8733.97 82.23 359.73 3,374.58 6,878.00 N 347.40 E 6878.00 1.19 8829.77 82.12 358.47 3,387.62 6,972.90 N 345.91 E 6972.90 1.31 8921.65 82.53 358.51 3,399.89 7,063.92 N 343.51 E 7063.92 0.45 9020.39 82.25 358.19 3,412.97 7,161.75 N 340.69 E 7161.75 0.43 9109.82 82.97 357.06 3,424.47 7,250.36 N 337.02 E 7250.36 1.49 9140.07 84.98 357.23 3,427.65 7,280.41 N 335.52 E 7280.41 6.67 9173.95 83.74 357.26 3,430.98 7,314.08 N 333.90 E 7314.08 3.66 9236.04 83.16 357.97 3,438.06 7,375.71 N 331.33 E 7375.71 1.47 9332.21 82.36 359.41 3,450.18 7,471.09 N 329.15 E 7471.09 1.70 9427.71 81.24 359.74 3,463.80 7,565.61 N 328.45 E 7565.61 1.22 9525.61 82.24 0.93 3,477.87 7,662.49 N 329.01 E 7662.49 1.58 9618.60 82.46 0.96 3,490.24 7,754.64 N 330.53 E 7754.64 0.24 9714.01 81.94 0.87 3,503.19 7,849.15 N 332.04 E 7849.15 0.55 9809.58 82.03 0.65 3,516.52 7,943.78 N 333.30 E 7943.78 0.25 9905.46 81.29 1.00 3,530.43 8,038.64 N 334.66 E 8038.64 0.85 10001.03 81.77 0.49 3,544.50 8,133.15 N 335.89 E 8133.15 0.73 10096.27 81.53 0.13 3,558.33 8,227.38 N 336.40 E 8227.38 0.45 10191.81 84.75 0.53 3,569.74 8,322.22 N 336.95 E 8322.23 3.40 10289.14 84.39 0.41 3,578.95 8,419.11 N 337.75 E 8419.11 0.39 10340.69 83.09 358.92 3,584.58 8,470.35 N 337.45 E 8470.35 3.82 10385.58 81.84 357.98 3,590.46 8,514.84 N 336.24 E 8514.84 3.47 10481.36 82.51 357.71 3,603.50 8,609.66 N 332.68 E 8609.66 0.75 10576.61 81.47 355.39 3,616.78 8,703.80 N 327.00 E 8703.80 2.65 10672.88 81.34 353.63 3,631.17 8,798.55 N 317.90 E 8798.55 1.81 10768.95 81.35 351.64 3,645.62 8,892.74 N 305.72 E 8892.74 2.05 10863.81 81.27 349.14 3,659.96 8,985.18 N 290.07 E 8985.18 2.61 10958.35 81.94 347.23 3,673.76 9,076.72 N 270.92 E 9076.73 2.12 INSITE V8.0.20 Page 3Job No:AK-XX-0901007074 Well Name:OP09-S1L1 Survey Report DIRECTIONAL SURVEY DATA (ft) Measured Depth DoglegVertical SectionDeparture (ft) Latitude (ft) Vertical Depth (deg) DirectionInclination (deg)(ft)(ft)(°/100') 11055.34 82.03 344.92 3,687.29 9,169.94 N 247.81 E 9169.94 2.36 11150.38 82.90 343.51 3,699.75 9,260.60 N 222.18 E 9260.60 1.73 11245.43 83.08 341.86 3,711.35 9,350.66 N 194.10 E 9350.66 1.73 11339.05 83.22 340.34 3,722.52 9,438.60 N 163.99 E 9438.60 1.62 11433.54 83.37 336.19 3,733.56 9,525.75 N 129.25 E 9525.75 4.36 11530.10 83.40 336.48 3,744.68 9,613.60 N 90.75 E 9613.60 0.30 11625.51 81.59 334.50 3,757.14 9,699.66 N 51.51 E 9699.66 2.80 11721.32 82.92 333.67 3,770.05 9,785.05 N 10.02 E 9785.05 1.63 11817.56 83.65 331.94 3,781.31 9,870.06 N 33.66 W 9870.06 1.94 11913.70 83.51 328.51 3,792.06 9,952.97 N 81.10 W 9952.97 3.55 12009.64 83.25 326.77 3,803.12 10,033.47 N 132.10 W 10033.47 1.82 12104.34 82.89 323.76 3,814.55 10,110.72 N 185.66 W 10110.72 3.18 12199.73 84.14 321.01 3,825.33 10,185.78 N 243.50 W 10185.78 3.15 12296.02 84.56 317.98 3,834.81 10,258.63 N 305.73 W 10258.63 3.16 12391.16 84.14 314.81 3,844.18 10,327.18 N 371.02 W 10327.18 3.35 12487.61 83.75 310.82 3,854.35 10,392.35 N 441.36 W 10392.35 4.13 12583.13 84.15 309.45 3,864.42 10,453.58 N 513.98 W 10453.58 1.49 12679.11 84.19 308.96 3,874.17 10,513.93 N 587.97 W 10513.93 0.51 12774.86 83.34 309.59 3,884.57 10,574.19 N 661.65 W 10574.19 1.10 12827.00 83.48 309.49 3,890.56 10,607.16 N 701.60 W 10607.16 0.33 12877.11 85.11 311.70 3,895.54 10,639.61 N 739.45 W 10639.61 5.46 12972.65 87.92 316.20 3,901.35 10,705.77 N 808.08 W 10705.77 5.55 13073.02 87.02 321.65 3,905.78 10,781.33 N 873.94 W 10781.33 5.50 13153.52 88.40 322.63 3,909.00 10,844.83 N 923.31 W 10844.83 2.10 13249.11 87.53 322.65 3,912.39 10,920.76 N 981.27 W 10920.76 0.91 13344.90 89.14 320.63 3,915.18 10,995.84 N 1,040.69 W 10995.84 2.70 13440.62 89.98 321.74 3,915.91 11,070.41 N 1,100.69 W 11070.42 1.45 13536.40 89.61 320.90 3,916.25 11,145.18 N 1,160.55 W 11145.18 0.96 13632.36 89.30 319.97 3,917.17 11,219.16 N 1,221.66 W 11219.16 1.02 13728.07 89.01 318.61 3,918.58 11,291.70 N 1,284.08 W 11291.70 1.45 13823.88 88.60 317.87 3,920.58 11,363.15 N 1,347.88 W 11363.15 0.88 13919.67 88.82 313.99 3,922.73 11,431.94 N 1,414.47 W 11431.94 4.06 14015.32 89.77 312.97 3,923.91 11,497.75 N 1,483.87 W 11497.75 1.46 14111.23 90.92 311.10 3,923.33 11,561.97 N 1,555.10 W 11561.97 2.29 14206.68 90.69 308.73 3,921.99 11,623.20 N 1,628.30 W 11623.20 2.49 14302.75 89.29 306.77 3,922.01 11,682.01 N 1,704.26 W 11682.01 2.51 14398.54 88.24 303.23 3,924.07 11,736.93 N 1,782.69 W 11736.93 3.85 14494.35 90.02 301.29 3,925.53 11,788.06 N 1,863.69 W 11788.06 2.75 14589.31 91.08 298.96 3,924.62 11,835.72 N 1,945.82 W 11835.72 2.70 14685.00 89.77 298.17 3,923.91 11,881.47 N 2,029.85 W 11881.47 1.60 14780.74 87.67 297.23 3,926.05 11,925.96 N 2,114.60 W 11925.96 2.40 14876.64 91.37 300.07 3,926.85 11,971.92 N 2,198.73 W 11971.92 4.86 14972.38 89.26 302.05 3,926.32 12,021.31 N 2,280.73 W 12021.31 3.02 15068.16 89.06 300.77 3,927.73 12,071.22 N 2,362.46 W 12071.22 1.35 15164.02 89.28 299.52 3,929.12 12,119.36 N 2,445.35 W 12119.36 1.32 INSITE V8.0.20 Page 4Job No:AK-XX-0901007074 Well Name:OP09-S1L1 Survey Report DIRECTIONAL SURVEY DATA (ft) Measured Depth DoglegVertical SectionDeparture (ft) Latitude (ft) Vertical Depth (deg) DirectionInclination (deg)(ft)(ft)(°/100') 15259.93 88.87 299.06 3,930.66 12,166.27 N 2,528.99 W 12166.27 0.64 15354.76 89.87 297.93 3,931.71 12,211.51 N 2,612.32 W 12211.51 1.59 15450.35 90.70 298.01 3,931.23 12,256.34 N 2,696.74 W 12256.34 0.87 15546.13 92.80 298.09 3,928.31 12,301.36 N 2,781.23 W 12301.36 2.19 15641.86 92.85 299.35 3,923.59 12,347.30 N 2,865.08 W 12347.30 1.32 15737.12 90.96 300.04 3,920.42 12,394.47 N 2,947.78 W 12394.46 2.11 15832.92 90.50 301.98 3,919.20 12,443.81 N 3,029.88 W 12443.81 2.08 15928.69 89.78 303.65 3,918.97 12,495.71 N 3,110.36 W 12495.71 1.90 16024.54 89.37 303.77 3,919.68 12,548.91 N 3,190.09 W 12548.91 0.45 16120.39 89.50 303.43 3,920.62 12,601.95 N 3,269.92 W 12601.95 0.38 16216.18 89.42 302.26 3,921.53 12,653.90 N 3,350.39 W 12653.90 1.22 16300.00 90.00 302.37 3,921.95 12,698.70 N 3,421.23 W 12698.70 0.70 16324.22 89.33 303.25 3,922.09 12,711.83 N 3,441.59 W 12711.83 4.57 16420.34 88.68 305.53 3,923.76 12,766.10 N 3,520.89 W 12766.10 2.47 16515.95 88.34 307.30 3,926.25 12,822.84 N 3,597.80 W 12822.84 1.88 16611.38 88.39 308.33 3,928.97 12,881.32 N 3,673.16 W 12881.33 1.08 16707.16 87.44 307.72 3,932.45 12,940.29 N 3,748.56 W 12940.29 1.18 16803.08 88.90 305.72 3,935.52 12,997.60 N 3,825.40 W 12997.60 2.58 16898.85 88.47 301.50 3,937.72 13,050.59 N 3,905.12 W 13050.59 4.43 16994.61 87.71 302.00 3,940.91 13,100.95 N 3,986.50 W 13100.95 0.95 17090.29 88.72 298.17 3,943.89 13,148.88 N 4,069.24 W 13148.88 4.14 17186.28 89.84 298.12 3,945.10 13,194.15 N 4,153.87 W 13194.15 1.17 17281.74 91.94 297.25 3,943.61 13,238.50 N 4,238.38 W 13238.50 2.38 17377.96 91.46 295.88 3,940.76 13,281.51 N 4,324.41 W 13281.51 1.51 17473.28 89.59 293.78 3,939.89 13,321.53 N 4,410.90 W 13321.53 2.95 17569.09 90.88 294.77 3,939.49 13,360.92 N 4,498.24 W 13360.92 1.70 17664.91 90.95 296.41 3,937.96 13,402.30 N 4,584.64 W 13402.30 1.71 17760.92 90.74 297.55 3,936.55 13,445.85 N 4,670.19 W 13445.85 1.21 17856.58 91.92 298.44 3,934.33 13,490.74 N 4,754.64 W 13490.74 1.54 17952.23 92.84 297.77 3,930.35 13,535.76 N 4,838.93 W 13535.76 1.19 18047.98 93.45 299.29 3,925.10 13,581.42 N 4,922.93 W 13581.42 1.71 18143.82 91.73 299.49 3,920.77 13,628.40 N 5,006.34 W 13628.40 1.81 18239.29 91.99 299.51 3,917.67 13,675.39 N 5,089.39 W 13675.39 0.27 18334.43 91.48 298.84 3,914.79 13,721.75 N 5,172.42 W 13721.75 0.88 18430.07 91.45 299.82 3,912.35 13,768.58 N 5,255.78 W 13768.58 1.02 18525.82 90.35 299.55 3,910.84 13,815.99 N 5,338.95 W 13815.99 1.18 18621.46 90.31 299.05 3,910.29 13,862.80 N 5,422.35 W 13862.79 0.52 18717.18 90.35 299.37 3,909.74 13,909.51 N 5,505.90 W 13909.51 0.34 18812.77 91.50 300.39 3,908.20 13,957.12 N 5,588.77 W 13957.12 1.61 18908.73 91.98 302.01 3,905.28 14,006.81 N 5,670.81 W 14006.81 1.76 19004.53 89.60 302.42 3,903.96 14,057.87 N 5,751.85 W 14057.87 2.52 19100.37 89.74 302.05 3,904.51 14,108.99 N 5,832.91 W 14108.99 0.41 19196.06 91.35 302.34 3,903.60 14,159.97 N 5,913.88 W 14159.97 1.71 19291.81 91.57 302.59 3,901.16 14,211.35 N 5,994.64 W 14211.35 0.35 19387.48 88.14 302.21 3,901.41 14,262.60 N 6,075.41 W 14262.60 3.61 INSITE V8.0.20 Page 5Job No:AK-XX-0901007074 Well Name:OP09-S1L1 Survey Report DIRECTIONAL SURVEY DATA (ft) Measured Depth DoglegVertical SectionDeparture (ft) Latitude (ft) Vertical Depth (deg) DirectionInclination (deg)(ft)(ft)(°/100') 19483.26 90.63 301.01 3,902.43 14,312.80 N 6,156.96 W 14312.79 2.89 19579.02 89.21 302.29 3,902.57 14,363.04 N 6,238.48 W 14363.04 2.00 19674.63 90.02 301.48 3,903.21 14,413.54 N 6,319.66 W 14413.54 1.20 19770.33 91.32 299.67 3,902.09 14,462.21 N 6,402.04 W 14462.21 2.33 19866.38 92.29 299.03 3,899.07 14,509.27 N 6,485.72 W 14509.27 1.21 19962.05 91.94 296.62 3,895.53 14,553.89 N 6,570.26 W 14553.89 2.54 20057.15 92.27 299.03 3,892.04 14,598.25 N 6,654.31 W 14598.25 2.56 20153.00 92.27 300.09 3,888.24 14,645.50 N 6,737.61 W 14645.50 1.11 20248.42 91.83 301.87 3,884.83 14,694.58 N 6,819.37 W 14694.58 1.92 20344.04 92.59 303.76 3,881.14 14,746.36 N 6,899.66 W 14746.36 2.13 20439.84 92.58 305.21 3,876.82 14,800.54 N 6,978.55 W 14800.54 1.51 20535.45 92.40 304.06 3,872.67 14,854.83 N 7,057.14 W 14854.83 1.22 20631.23 92.43 304.75 3,868.63 14,908.90 N 7,136.09 W 14908.90 0.72 20727.08 90.93 304.90 3,865.82 14,963.61 N 7,214.74 W 14963.61 1.57 20822.93 90.27 303.25 3,864.82 15,017.31 N 7,294.12 W 15017.31 1.85 20918.00 90.31 302.54 3,864.34 15,068.94 N 7,373.95 W 15068.94 0.75 21013.78 90.67 301.65 3,863.52 15,119.83 N 7,455.09 W 15119.83 1.00 21109.64 90.47 300.53 3,862.57 15,169.32 N 7,537.17 W 15169.32 1.19 21204.93 90.87 299.61 3,861.45 15,217.07 N 7,619.63 W 15217.07 1.05 21300.62 89.18 298.52 3,861.41 15,263.55 N 7,703.27 W 15263.55 2.10 21399.84 91.33 298.53 3,860.97 15,310.93 N 7,790.44 W 15310.93 2.17 21465.00 91.33 298.53 3,859.46 15,342.04 N 7,847.67 W 15342.04 0.00 DIRECTIONAL SURVEY DATA NOTES - Calculation based on minimum curvature method. - Survey coordinates relative to well system reference point. - TVD values given relative to drilling measurement point. - Vertical section relative to well head. - Vertical section is computed along a direction of 0.00 degrees (Grid) - A total correction of 0.00 deg from Magnetic north to Grid north has been applied - Horizontal displacement is relative to the well head. - Horizontal displacement (closure) at 21,465.00 feet is 17,232.65 feet along 332.91 degrees (Grid) INSITE V8.0.20 Page 6Job No:AK-XX-0901007074 Well Name:OP09-S1L1 Survey Report WARRANTY HALLIBURTON ENERGY SERVICES, INC. WILL USE ITS BEST EFFORTS TO FURNISH CUSTOMERS WITH ACCURATE INFORMATION AND INTERPRETATIONS THAT ARE PART OF, AND INCIDENT TO, THE SERVICES PROVIDED. HOWEVER, HALLIBURTON ENERGY SERVICES, INC. CANNOT AND DOES NOT WARRANT THE ACCURACY OR CORRECTNESS OF SUCH INFORMATION AND INTERPRETATIONS. UNDER NO CIRCUMSTANCES SHOULD ANY SUCH INFORMATION OR INTERPRETATION BE RELIED UPON AS THE SOLE BASIS FOR ANY DRILLING, COMPLETION, PRODUCTION, OR FINANCIAL DECISION OR ANY PROCEDURE INVOLVING ANY RISK TO THE SAFETY OF ANY DRILLING VENTURE, DRILLING RIG OR ITS CREW OR ANY THIRD PARTY. THE CUSTOMER HAS FULL RESPONSIBILITY FOR ALL DRILLING, COMPLETION, AND PRODUCTION OPERATION. HALLIBURTON ENERGY SERVICES, INC. MAKES NO REPRESENTATIONS OR WARRANTIES, EITHER EXPRESSED OR IMPLIED, INCLUDING, BUT NOT LIMITED TO, THE IMPLIED WARRANTIES OF MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE, WITH RESPECT TO THE SERVICES RENDERED. IN NO EVENT WILL HALLIBURTON ENERGY SERVICES, INC. SERVICES BE LIABLE FOR FAILURE TO OBTAIN ANY PARTICULAR RESULTS OR FOR ANY DAMAGES, INCLUDING, BUT NOT LIMITED TO, INDIRECT, SPECIAL OR CONSEQUENTIAL DAMAGES, RESULTING FROM THE USE OF ANY INFORMATION OR INTERPRETATION PROVIDED BY HALLIBURTON ENERGY SERVICES, INC. INSITE V8.0.20 Page 7Job No:AK-XX-0901007074 Well Name:OP09-S1L1 Survey Report WELL INFORMATION Created On : Mar 17 2014 Customer :Eni Petroleum Well Name :OP09-S1L1 PB1 Job Number :AK-XX-0901007074 Rig Name :Nabors 245E Field Name :Nikaitchuq Country :USA Survey Report Survey dataSURVEY HEADER Survey data provided by Schlumberger. DIRECTIONAL SURVEY DATA Tie-in 12009.00 83.25 326.77 3803.11 0.00 N 0.00 E (ft) Measured Depth DoglegVertical SectionDeparture (ft) Latitude (ft) Vertical Depth (deg) DirectionInclination (deg)(ft)(ft)(°/100') 12009.64 83.25 326.77 3,803.19 0.53 N 0.35 W 0.53 3.16 12104.34 82.89 323.76 3,814.62 77.77 N 53.92 W 77.77 3.16 12104.34 82.89 323.76 3,814.62 77.77 N 53.92 W 77.77 3.16 12104.34 82.89 323.76 3,814.62 77.77 N 53.92 W 77.77 3.16 12199.73 84.14 321.01 3,825.39 152.84 N 111.76 W 152.84 3.15 12199.73 84.14 321.01 3,825.39 152.84 N 111.76 W 152.84 3.15 12199.73 84.14 321.01 3,825.39 152.84 N 111.76 W 152.84 3.15 12296.02 84.56 317.98 3,834.87 225.68 N 173.99 W 225.68 3.16 12296.02 84.56 317.98 3,834.87 225.68 N 173.99 W 225.68 3.16 12296.02 84.56 317.98 3,834.87 225.68 N 173.99 W 225.68 3.16 12391.16 84.14 314.81 3,844.24 294.23 N 239.28 W 294.23 3.34 12391.16 84.14 314.81 3,844.24 294.23 N 239.28 W 294.23 3.34 12391.16 84.14 314.81 3,844.24 294.23 N 239.28 W 294.23 3.34 12487.61 83.75 310.82 3,854.42 359.41 N 309.62 W 359.41 4.13 12487.61 83.75 310.82 3,854.42 359.41 N 309.62 W 359.41 4.13 12487.61 83.75 310.82 3,854.42 359.41 N 309.62 W 359.41 4.13 12583.13 84.15 309.45 3,864.49 420.63 N 382.24 W 420.63 1.49 12583.13 84.15 309.45 3,864.49 420.63 N 382.24 W 420.63 1.49 12583.13 84.15 309.45 3,864.49 420.63 N 382.24 W 420.63 1.49 12679.11 84.19 308.96 3,874.24 480.99 N 456.23 W 480.99 0.51 12679.11 84.19 308.96 3,874.24 480.99 N 456.23 W 480.99 0.51 12679.11 84.19 308.96 3,874.24 480.99 N 456.23 W 480.99 0.51 12774.86 83.34 309.59 3,884.64 541.24 N 529.91 W 541.24 1.10 12774.86 83.34 309.59 3,884.64 541.24 N 529.91 W 541.24 1.10 12774.86 83.34 309.59 3,884.64 541.24 N 529.91 W 541.24 1.10 12827.00 83.48 309.49 3,890.62 574.21 N 569.86 W 574.21 0.33 12827.00 83.48 309.49 3,890.62 574.21 N 569.86 W 574.21 0.33 12877.11 85.11 311.40 3,895.60 606.56 N 607.80 W 606.56 5.00 12877.11 85.11 311.70 3,895.60 606.56 N 607.80 W 606.56 5.00 12877.11 85.11 311.70 3,895.60 606.56 N 607.80 W 606.56 5.00 12877.11 85.11 311.70 3,895.60 606.56 N 607.80 W 606.56 5.00 INSITE V8.0.20 Page 1Job No:AK-XX-0901007074 Well Name:OP09-S1L1 PB1 Survey Report DIRECTIONAL SURVEY DATA (ft) Measured Depth DoglegVertical SectionDeparture (ft) Latitude (ft) Vertical Depth (deg) DirectionInclination (deg)(ft)(ft)(°/100') 12972.65 87.92 315.20 3,901.41 671.95 N 677.18 W 671.95 4.94 12972.65 87.92 316.20 3,901.41 671.95 N 677.18 W 671.95 4.94 12972.65 87.92 316.20 3,901.41 671.95 N 677.18 W 671.95 4.94 12972.65 87.92 316.20 3,901.41 671.95 N 677.18 W 671.95 4.94 13068.01 87.01 320.56 3,905.63 742.58 N 741.05 W 742.58 5.70 13073.02 87.06 322.44 3,905.89 746.50 N 744.17 W 746.50 37.49 13073.02 87.06 322.44 3,905.89 746.50 N 744.17 W 746.50 37.49 13073.02 87.06 322.44 3,905.89 746.50 N 744.17 W 746.50 37.49 13153.52 88.35 323.30 3,909.12 810.62 N 792.72 W 810.62 1.93 13153.52 88.35 323.30 3,909.12 810.62 N 792.72 W 810.62 1.93 13153.52 88.35 323.30 3,909.12 810.62 N 792.72 W 810.62 1.93 13249.11 87.59 322.59 3,912.50 886.86 N 850.28 W 886.86 1.09 13249.11 87.59 322.59 3,912.50 886.86 N 850.28 W 886.86 1.09 13249.11 87.59 322.59 3,912.50 886.86 N 850.28 W 886.86 1.09 13344.90 89.13 320.57 3,915.24 961.87 N 909.78 W 961.87 2.65 13440.62 89.96 322.44 3,916.00 1,036.78 N 969.35 W 1036.78 2.14 13536.40 89.85 322.30 3,916.16 1,112.64 N 1,027.83 W 1112.64 0.19 13536.40 89.62 321.08 3,916.16 1,112.64 N 1,027.83 W 1112.64 0.19 13632.36 89.30 320.75 3,916.87 1,187.76 N 1,087.53 W 1187.76 1.71 13728.07 89.02 319.28 3,918.28 1,261.08 N 1,149.03 W 1261.08 1.56 13823.88 88.62 318.69 3,920.25 1,333.36 N 1,211.89 W 1333.36 0.74 13919.67 88.84 313.96 3,922.38 1,402.60 N 1,278.00 W 1402.60 4.94 14015.32 89.78 313.44 3,923.53 1,468.68 N 1,347.15 W 1468.68 1.12 14111.23 90.89 311.39 3,922.97 1,533.37 N 1,417.95 W 1533.37 2.43 14206.68 90.66 308.76 3,921.67 1,594.80 N 1,490.98 W 1594.81 2.77 14302.75 89.30 307.22 3,921.71 1,653.94 N 1,566.69 W 1653.94 2.14 14398.54 88.30 303.46 3,923.72 1,709.32 N 1,644.79 W 1709.32 4.06 14494.35 90.02 301.61 3,925.12 1,760.84 N 1,725.55 W 1760.84 2.64 14589.31 91.05 299.32 3,924.23 1,808.98 N 1,807.39 W 1808.98 2.64 14685.00 89.76 298.48 3,923.56 1,855.22 N 1,891.16 W 1855.22 1.61 14780.74 87.79 297.70 3,925.60 1,900.29 N 1,975.60 W 1900.29 2.21 14876.64 91.27 300.55 3,926.39 1,946.95 N 2,059.35 W 1946.95 4.69 14972.38 89.30 302.49 3,925.91 1,997.00 N 2,140.96 W 1997.00 2.89 15068.16 89.07 301.30 3,927.28 2,047.60 N 2,222.26 W 2047.60 1.27 15164.02 89.27 299.80 3,928.67 2,096.32 N 2,304.81 W 2096.32 1.58 15259.93 88.89 299.59 3,930.21 2,143.82 N 2,388.11 W 2143.82 0.45 15354.76 89.86 298.05 3,931.24 2,189.53 N 2,471.19 W 2189.53 1.92 15450.35 90.72 298.32 3,930.76 2,234.68 N 2,555.44 W 2234.68 0.94 15546.13 92.76 298.47 3,927.85 2,280.20 N 2,639.65 W 2280.20 2.14 15641.86 92.82 299.92 3,923.19 2,326.84 N 2,723.12 W 2326.84 1.51 15737.12 90.97 300.37 3,920.04 2,374.65 N 2,805.45 W 2374.65 2.00 15832.92 90.49 302.26 3,918.82 2,424.44 N 2,887.28 W 2424.44 2.04 15928.69 89.78 303.90 3,918.59 2,476.71 N 2,967.53 W 2476.71 1.87 16024.54 89.39 304.17 3,919.29 2,530.35 N 3,046.95 W 2530.35 0.49 16120.39 89.50 303.99 3,920.21 2,584.06 N 3,126.34 W 2584.06 0.22 INSITE V8.0.20 Page 2Job No:AK-XX-0901007074 Well Name:OP09-S1L1 PB1 Survey Report DIRECTIONAL SURVEY DATA (ft) Measured Depth DoglegVertical SectionDeparture (ft) Latitude (ft) Vertical Depth (deg) DirectionInclination (deg)(ft)(ft)(°/100') 16216.18 89.45 302.51 3,921.09 2,636.58 N 3,206.44 W 2636.58 1.55 16311.96 90.07 302.92 3,921.49 2,688.34 N 3,287.03 W 2688.34 0.78 16407.70 89.99 302.34 3,921.44 2,739.97 N 3,367.65 W 2739.97 0.61 16503.31 90.05 301.42 3,921.41 2,790.46 N 3,448.84 W 2790.46 0.96 16598.72 89.87 300.05 3,921.48 2,839.22 N 3,530.85 W 2839.22 1.45 16694.52 89.92 298.86 3,921.65 2,886.33 N 3,614.26 W 2886.33 1.24 16790.44 88.81 298.41 3,922.72 2,932.29 N 3,698.45 W 2932.29 1.25 16886.21 89.42 300.76 3,924.19 2,979.57 N 3,781.71 W 2979.57 2.53 16981.97 87.22 300.22 3,927.00 3,028.13 N 3,864.19 W 3028.13 2.37 17077.80 87.93 300.18 3,931.06 3,076.29 N 3,946.94 W 3076.29 0.74 17173.54 90.29 300.34 3,932.54 3,124.53 N 4,029.62 W 3124.53 2.47 DIRECTIONAL SURVEY DATA NOTES - Calculation based on minimum curvature method. - Survey coordinates relative to well system reference point. - TVD values given relative to drilling measurement point. - Vertical section relative to well head. - Vertical section is computed along a direction of 0.00 degrees (Grid) - A total correction of 0.00 deg from Magnetic north to Grid north has been applied - Horizontal displacement is relative to the well head. - Horizontal displacement (closure) at 17,173.54 feet is 5,099.07 feet along 307.79 degrees (Grid) WARRANTY HALLIBURTON ENERGY SERVICES, INC. WILL USE ITS BEST EFFORTS TO FURNISH CUSTOMERS WITH ACCURATE INFORMATION AND INTERPRETATIONS THAT ARE PART OF, AND INCIDENT TO, THE SERVICES PROVIDED. HOWEVER, HALLIBURTON ENERGY SERVICES, INC. CANNOT AND DOES NOT WARRANT THE ACCURACY OR CORRECTNESS OF SUCH INFORMATION AND INTERPRETATIONS. UNDER NO CIRCUMSTANCES SHOULD ANY SUCH INFORMATION OR INTERPRETATION BE RELIED UPON AS THE SOLE BASIS FOR ANY DRILLING, COMPLETION, PRODUCTION, OR FINANCIAL DECISION OR ANY PROCEDURE INVOLVING ANY RISK TO THE SAFETY OF ANY DRILLING VENTURE, DRILLING RIG OR ITS CREW OR ANY THIRD PARTY. THE CUSTOMER HAS FULL RESPONSIBILITY FOR ALL DRILLING, COMPLETION, AND PRODUCTION OPERATION. HALLIBURTON ENERGY SERVICES, INC. MAKES NO REPRESENTATIONS OR WARRANTIES, EITHER EXPRESSED OR IMPLIED, INCLUDING, BUT NOT LIMITED TO, THE IMPLIED WARRANTIES OF MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE, WITH RESPECT TO THE SERVICES RENDERED. IN NO EVENT WILL HALLIBURTON ENERGY SERVICES, INC. SERVICES BE LIABLE FOR FAILURE TO OBTAIN ANY PARTICULAR RESULTS OR FOR ANY DAMAGES, INCLUDING, BUT NOT LIMITED TO, INDIRECT, SPECIAL OR CONSEQUENTIAL DAMAGES, RESULTING FROM THE USE OF ANY INFORMATION OR INTERPRETATION PROVIDED BY HALLIBURTON ENERGY SERVICES, INC. INSITE V8.0.20 Page 3Job No:AK-XX-0901007074 Well Name:OP09-S1L1 PB1 Survey Report