HomeMy WebLinkAbout213-1731. Type of Request: Abandon Plug Perforations Fracture Stimulate Repair Well Operations shutdown
Suspend Perforate Other Stimulate Pull Tubing Change Approved Program
Plug for Redrill Perforate New Pool Re-enter Susp Well Alter Casing Other: ESP Swap
2. Operator Name: 4. Current Well Class: 5. Permit to Drill Number:
Exploratory Development
3. Address:Stratigraphic Service
6. API Number:
7. If perforating: 8. Well Name and Number:
What Regulation or Conservation Order governs well spacing in this pool?
Yes No
9. Property Designation (Lease Number): 10. Field:
NIKAITCHUQ
11.
Total Depth MD (ft): Total Depth TVD (ft): Effective Depth MD: Effective Depth TVD: Junk (MD):
22,370' main
21,465' L1
Casing Collapse
Conductor
Surface 260psi
Intermediate 3,090psi
Production slotted
Production slotted
Packers and SSSV Type: Packers and SSSV MD (ft) and TVD (ft):
12. Attachments: Proposal Summary Wellbore schematic 13. Well Class after proposed work:
Detailed Operations Program BOP Sketch Exploratory Stratigraphic Development Service
14. Estimated Date for 15. Well Status after proposed work:
Commencing Operations: OIL WINJ WDSPL Suspended
16. Verbal Approval: Date: GAS WAG GSTOR SPLUG
AOGCC Representative: GINJ Op Shutdown Abandoned
Contact Name:
Contact Email:
Contact Phone:
Authorized Title:
Conditions of approval: Notify AOGCC so that a representative may witness Sundry Number:
Plug Integrity BOP Test Mechanical Integrity Test Location Clearance
Other Conditions of Approval:
Post Initial Injection MIT Req'd? Yes No
APPROVED BY
Approved by: COMMISSIONER THE AOGCC Date:
Comm. Comm. Sr Pet Eng Sr Pet Geo Sr Res Eng
3,784' main 21,740' main 3,868' main
745 NA
Ryan Rupert
Subsequent Form Required:
Suspension Expiration Date:
Will perfs require a spacing exception due to property boundaries?
Current Pools:
MPSP (psi): Plugs (MD):
17. I hereby certify that the foregoing is true and the procedure approved herein will not be deviated from without prior written approval.
Authorized Name and
Digital Signature with Date:
Tubing Size:
PRESENT WELL CONDITION SUMMARY
AOGCC USE ONLY
slotted
Tubing Grade: Tubing MD (ft):Perforation Depth TVD (ft):
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
APPLICATION FOR SUNDRY APPROVALS
20 AAC 25.280
ADL 0355024, 0373301, 0388583, 0390616, 0391283
211-058 main, 213-173 L1
NA OP09-S01L1
3800 Centerpoint Dr, Suite 1400 Anchorage, AK 99503 50-029-23448-00-00 / 60-00
Hilcorp Alaska, LLC
Length Size
Proposed Pools:
3,859' L1 21,460' L1 3,860' L1
SCHRADER BLUFF OIL SCHRADER BLUFF OIL
NA
6.4#, L-80
TVD Burst
10,029
slotted
MD
5,750psi
5,020psi
160'
2,159'
3,910'
160'
2,325'
3,868'5-1/2" mainbore
20"
13-3/8"
160'
9-5/8"13,195'
2,325'
907-777-8503
ryan.rupert@hilcorp.com
Operations Manager
November 7, 2025
21,460'8,818'
2-7/8"
3,860'
Perforation Depth MD (ft):
Slotted Liner
NA and NA NA and NA
21,740'
13,195'
8,754'
5-1/2" lateral L1
Slotted Liner
Form 10-403 Revised 06/2023 Approved application valid for 12 months from date of approval.Submit PDF to aogcc.permitting@alaska.gov
Digitally signed by Sara
Hannegan (2519)
DN: cn=Sara Hannegan (2519)
Date: 2025.10.29 14:19:41 -
08'00'
Sara Hannegan
(2519)
OP09-S01 / L1
By Grace Christianson at 3:55 pm, Oct 29, 2025
325-671
SFD 10/30/2025 DSR-10/30/25MGR31OCT25
* BOPE pressure test to 2500 psi. 48 hour notice to AOGCC.
10-404
RUSH
10/31/25
ESP Swap RWO
Well: OP09
Well Name:OP09 API Number:50-029-23448-60-00
Current Status:ESP producer Permit to Drill Number:213-173
First Call Engineer:Ryan Rupert (907) 301-1736 (c)
Second Call Engineer:Keith Lopez (907) 903-5432 (c)
Maximum Expected BHP:1100 psi @ 3,558 TVD (6.1ppg) Mar-25 Pre-startup static (75 days SI)
Max. Potential Surface Pressure: 745 psi Using 0.1 psi/ft
Brief Well Summary
OP09 is a dual lateral OA sand producer. It is currently showing performance issues, and likely needs an ESP
swap. It passed an MIT of the 9-5/8 casing in 2024.
The goal of this project is install a new ESP and return the well to full production
Pertinent wellbore information:
- Deviation: Goes >70 degrees at 3100 MD
- DLS:
o Max DLS above top liner = 6.7 degrees / 100 at 91940 MD
o DLS spike into 3-4 degrees / 100 from top liner up to 10,200 MD
o Previous ESP was set from 10,000 10,100 MD
-Last casing test: MIT of 9-5/8 casing PASSED to 2100psi down to LTP at 12,642 MD on 2/29/24.
- Pertinent History:
o 2011: Drill and complete as single horizontal in OA sand. Installed TT-ESP (2.4 year run life)
o 2014: Elective pull of ESP and added 2nd OA lateral (9.8 year run life)
o Mar-2024: ESP swap with casing test (0.1 years)
Found ESP parted at Intake
Was set from 12572 12,654 MD just above ToL. Was run through several 4 deg DLS
Installed new 2-7/8 tubing (non-coated)
o June-2024: ESP swap (0.6 years)
Reran 2-7/8 tubing (non-coated)
Moved back uphole to gentle DLS section
o March-2025: ESP Swap (current install)
Reran 2-7/8 tubing (non-coated)
L1:
Main: 50-029-23448-00-00 / 211-058 SFD
L1:
ESP Swap RWO
Well: OP09
RWO Procedure
1. MIRU Nordic #4
2. Circulate / kill well:
a. Work over fluid will be injection water (8.33ppg or heavier)
b. Ensure any wellbore fluids are fully displaced with KWF either via circulation or bullheading
c. Tubing volume = 58bbls
d. IA to top liner = 873bbls
3. Set BPV/TWC, ND tree, NU BOP stack (see attached)
a. Notify AOGCC 48 hours in advance for witness
b. Test to 250psi Low /2,500psi High / 2,500psi Annular
c. BOPE will be used as needed to circulate the well
4. Pull BPV/TWC
5. BOLDS and unseat hanger
6. POOH laying down 4-1/2 ESP completion
7. Pickup cleanout run (if necessary)
8. Cleanout casing and liner as deep as practical
9. Pickup and RIH with ESP completion
a. Bottom ESP to be set at same location ±10,150 MD
b. New tubing will be ran (2-7/8, 3-1/2, or 4-1/2. TBD)
10. Land ESP completion
11. Set BPV/TWC, ND BOP
12. NU tree and test, pull BPV/TWC
13. RDMO RWO crew and equipment
Attachments:
1. Current Well Schematic
2. Proposed Well Schematic
3. BOP schematic
Lubricate BPV if pressure suspected below. - mgr
Nikaitchuq Field
Well: OP09-S01/S01L1
Last Completed: 3/15/2025
PTD: 211-058 (Mainbore) / 213-173 (Lateral)
API #: 50-029-23448-00-00 (Mainbore)/60-00 (Lateral)
Casing
20
13-3/8"
20" 9-5/8"
Size ID Top Btm
20" N/A Surface 160'
13-3/8" 12.415" Surface 2,325'
13-3/8" 9-5/8"8.835 Surface 13,195'
5-1/2 4.892 12,986' 21,740'
5-12"4.950 12,642' 21,460'
2-7/8"2.441 Surface 10,029'
No Top MD TVD Inc ID OD
1 9,980' 3,542' 82 2.205" 3.325"
10,029' 3,549' 82 2.323" 5.130"
10,030' 3,549' 82 NA 5.380"
10,048' 3,551' 82 NA 5.380"
10,058' 3,553' 82 NA 5.380"
10,063' 3,553' 82 NA 5.130"
10,064' 3,554' 82 NA 5.130"
10,071' 3,555' 82 NA 5.130"
10,078' 3,556' 82 NA 5.620"
10,095' 3,558' 83 NA 4.500"
10,097' 3,558' 82 NA 6.625"
3 12,642' 3,870' 84 4.950" 5.5"
4 12,986' 3,902' 88 4.950" 5.5"
1
Item
JEWELRY DETAIL
2.313" XN Nipple, 2.205" ID
Discharge Head
Lateral L1 Baker SLXP Liner Hanger/Packer
Pump #2
Pump #1
Gas Separator
Intake
Upper Seal
Lower Seal
Motor
Downhole Sensor
Centralizer
2
30" hole, cement to surface
Mainbore Baker SLXP Liner Hanger/Packer
Schematic
Dual Lateral Producer with ESP Lift
15.5#, L-80, Hyd 521
17#, L-80, Hyd 521
16" hole, Stg 1 430 bbls 10.7# ASL, Stg 2 75 bbls
12.5# DeepCrete
12-1/4" hole, 356 bbls 12.5# DeepCrete
CASING DETAIL
40#, L-80, Hyd 563Intermediate
Surface
Conductor
Type
68#, L-80, BTC
179#, X-65
2
Wt/ Grade/ Conn
Tubing
Production (OP09-S01L1)
Production (OP09-S01)
TUBING DETAIL
6.4#, L-80
CEMENT DETAIL
Cement Details Hole MD
160'
2,340'
13,220'
3
HAL 5-1/2" Oil Swell Packers
OA Sand
4
Lateral L1 5-1/2" Slotted liner to 21,460' MD/3,860' TVD, hole TD 21,465' MD
9-5/8"
OA Sand
Mainbore 5-1/2" Slotted liner to 21,740' MD/3,868' TVD, hole TD 22,370' MD
ESP power,
(2) 3/8"
Chem Line
00070 degree
inclination
@ ~3,134'
XN
Last edited by: DH 4/8/2025
Nikaitchuq Field
Last Completed: 3/15/2025
PTD: 211-058 (Mainbore) / 213-173 (Lateral)
API #: 50-029-23448-00-00 (Mainbore)/60-00 (Lateral)
Casing
20
13-3/8"
20" 9-5/8"
Size ID Top Btm
20" N/A Surface 160'
13-3/8" 12.415" Surface 2,325'
13-3/8" 9-5/8"8.835 Surface 13,195'
5-1/2 4.892 12,986' 21,740'
5-12"4.950 12,642' 21,460'
2-7/8"2.441 Surface 10,029'
No Top MD TVD Inc ID
1 ~10029 3,549' 82 NA
2 ~10097 3,558' 82 NA
3 12,642' 3,870' 84 4.950"
4 12,986' 3,902' 88 4.950"
1
2
Wt/ Grade/ Conn
Tubing
Production (OP09-S01L1)
Production (OP09-S01)
TUBING DETAIL
6.4#, 13Cr
CEMENT DETAIL
Cement Details Hole MD
160'
2,340'
13,220'
30" hole, cement to surface
Mainbore Baker SLXP Liner Hanger/Packer
OP09-S01 & L1 Proposed Schematic
Dual Lateral Producer with ESP Lift
15.5#, L-80, Hyd 521
17#, L-80, Hyd 521
16" hole, Stg 1 430 bbls 10.7# ASL, Stg 2 75 bbls
12.5# DeepCrete
12-1/4" hole, 356 bbls 12.5# DeepCrete
CASING DETAIL
40#, L-80, Hyd 563Intermediate
Surface
Conductor
Type
68#, L-80, BTC
179#, X-65
Item
ESP Top
Lateral L1 Baker SLXP Liner Hanger/Packer
ESP Bottom
JEWELRY DETAIL
3
HAL 5-1/2" Oil Swell Packers
OA Sand
4
Lateral L1 5-1/2" Slotted liner to 21,460' MD/3,860' TVD, hole TD 21,465' MD, drilled 2014
9-5/8"
OA Sand
Mainbore 5-1/2" Slotted liner to 21,740' MD/3,868' TVD, hole TD 22,370' MD, drilled 2011
ESP power,
(1) 3/8"
Chem Line
Flatpack
00070 degree
inclination
@ ~3,134'
OP09-S01 Proposed Schematic 10-28-2025 Last edited by: DH 10/29/2025
Nordic Rig 4 ARRS 5M
Nordic Calista 02.24.2025
All Components 5,000 psi
BLIND/SHEAR RAMS
VBR RAMS
CHOKE
HCR
MANUAL
CHOKE
KILL
HCR
INSIDE
KILL3" 5,000 PSI WP KILL
LINE
Annular
2 7/8 x 5 VBR
STATE OF ALASKA
OIL AND GAS CONSERVATION COMMISSION
BOPE Test Report for:
Reviewed By:
P.I. Suprv
Comm ________NIKAITCHUQ OP09-S01L1
JBR 04/25/2025
MISC. INSPECTIONS:
FLOOR SAFTY VALVES:CHOKE MANIFOLD:BOP STACK:
ACCUMULATOR SYSTEM:MUD SYSTEM:
P/F P/F
P/FP/FP/F
Visual Alarm
QuantityQuantity
Time/Pressure
SizeQuantity
Number of Failures:2
2-7/8" joint. B/S door seals FP-replaced for a pass. Mud cross manual choke failed. R/T not witnessed. Date/No. of failures
reflects when I was on location (VBR's passed while I was on location; during a retest of a different component, the rams failed
which was not witnessed).
Test Results
TEST DATA
Rig Rep:Kelly/BorgenOperator:Hilcorp Alaska, LLC Operator Rep:Grubb/Smith
Rig Owner/Rig No.:Nordic 4 PTD#:2131730 DATE:3/9/2025
Type Operation:WRKOV Annular:
250/5000Type Test:INIT
Valves:
250/5000
Rams:
250/5000
Test Pressures:Inspection No:bopSAM250310183336
Inspector Austin McLeod
Inspector
Insp Source
Related Insp No:
INSIDE REEL VALVES:
Quantity P/F
(Valid for Coil Rigs Only)
Remarks:
Test Time 7
MASP:
966
Sundry No:
325-068
Control System Response Time (sec)
Time P/F
Housekeeping:P
PTD On Location P
Standing Order Posted P
Well Sign P
Hazard Sec.NA
Test Fluid W
Misc NA
Upper Kelly 1 P
Lower Kelly 1 P
Ball Type 1 P
Inside BOP 1 P
FSV Misc 0 NA
14 PNo. Valves
1 PManual Chokes
1 PHydraulic Chokes
0 NACH Misc
Stripper 0 NA
Annular Preventer 1 13-5/8"P
#1 Rams 1 B/S P
#2 Rams 1 2-7/8"x5-1/2"P
#3 Rams 0 NA
#4 Rams 0 NA
#5 Rams 0 NA
#6 Rams 0 NA
Choke Ln. Valves 1 3-1/8"F
HCR Valves 2 3-1/8"P
Kill Line Valves 2 3-1/8"P
Check Valve 0 NA
BOP Misc 1 Door Seal FP
System Pressure P3050
Pressure After Closure P2100
200 PSI Attained P25
Full Pressure Attained P69
Blind Switch Covers:PAll stations
Bottle precharge P
Nitgn Btls# &psi (avg)P4@2650
ACC Misc NA0
P PTrip Tank
P PPit Level Indicators
P PFlow Indicator
P PMeth Gas Detector
P PH2S Gas Detector
0 NAMS Misc
Inside Reel Valves 0 NA
Annular Preventer P10
#1 Rams P6
#2 Rams P6
#3 Rams NA0
#4 Rams NA0
#5 Rams NA0
#6 Rams NA0
HCR Choke P1
HCR Kill P1
9
9
9
9 9999
9
9
9
9
9
7HVWFKDUWIRUIDLOHGPXGFURVVPDQXDOFKRNHDWWDFKHG
B/S door seals FP Mud cross manual choke failed R/T not witnessed
F
FP
#01&.BOVBM$IPLF3FUFTU/PSEJD
/JLBJUDIVR014- 15%
"0($$*OTQ3QUCPQ4".
1. Type of Request: Abandon Plug Perforations Fracture Stimulate Repair Well Operations shutdown
Suspend Perforate Other Stimulate Pull Tubing Change Approved Program
Plug for Redrill Perforate New Pool Re-enter Susp Well Alter Casing Other: ESP Swap
2.Operator Name: 4.Current Well Class:5.Permit to Drill Number:
Exploratory Development
3. Address:Stratigraphic Service
6. API Number:
7. If perforating:8.Well Name and Number:
What Regulation or Conservation Order governs well spacing in this pool?
Yes No
9.Property Designation (Lease Number):10. Field:
NIKAITCHUQ
11.
Total Depth MD (ft): Total Depth TVD (ft): Effective Depth MD: Effective Depth TVD: Junk (MD):
22,370 NA
Casing Collapse
Structural
Conductor
Surface 260psi
Intermediate 3,090psi
Production slotted
Production slotted
Packers and SSSV Type: Packers and SSSV MD (ft) and TVD (ft):
12. Attachments: Proposal Summary Wellbore schematic 13. Well Class after proposed work:
Detailed Operations Program BOP Sketch Exploratory Stratigraphic Development Service
14.Estimated Date for 15.Well Status after proposed work:
Commencing Operations: OIL WINJ WDSPL Suspended
16. Verbal Approval: Date: GAS WAG GSTOR SPLUG
AOGCC Representative: GINJ Op Shutdown Abandoned
Contact Name:
Contact Email:
Contact Phone:
Authorized Title:
Conditions of approval: Notify AOGCC so that a representative may witness Sundry Number:
Plug Integrity BOP Test Mechanical Integrity Test Location Clearance
Other Conditions of Approval:
Post Initial Injection MIT Req'd? Yes No
APPROVED BY
Approved by: COMMISSIONER THE AOGCC Date:
Comm. Comm. Sr Pet Eng Sr Pet Geo Sr Res Eng
NA and NA NA and NA
NA
21,740'
13,195'
8,754'
5-1/2" lateral L1
Slotted Liner
907-777-8503
ryan.rupert@hilcorp.com
Operations Manager
February 27, 2025
21,460'8,818'
2-7/8"
3,860'
Perforation Depth MD (ft):
Slotted Liner
3,868'5-1/2" mainbore
20"
13-3/8"
160'
9-5/8"13,195'
2,325'5,020psi
160'
2,159'
3,910'
160'
2,325'
L80
TVD Burst
9,915
slotted
MD
5,750psi
Hilcorp Alaska, LLC
Length Size
Proposed Pools:
3,784 21,740 3,868 966
SCHRADER BLUFF OIL SCHRADER BLUFF OIL
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
APPLICATION FOR SUNDRY APPROVALS
20 AAC 25.280
ADL 0355024, 0373301, 0388583, 0390616, 0391283
213-173
C.O. 639 OP09-S01L1
3800 Centerpoint Dr, Suite 1400 Anchorage, AK 99503 50-029-23448-60-00
PRESENT WELL CONDITION SUMMARY
AOGCC USE ONLY
slotted
Tubing Grade: Tubing MD (ft):Perforation Depth TVD (ft):
Ryan Rupert
Subsequent Form Required:
Suspension Expiration Date:
Will perfs require a spacing exception due to property boundaries?
Current Pools:
MPSP (psi): Plugs (MD):
17. I hereby certify that the foregoing is true and the procedure approved herein will not be deviated from without prior written approval.
Authorized Name and
Digital Signature with Date:
Tubing Size:
Form 10-403 Revised 06/2023 Approved application valid for 12 months from date of approval.Submit PDF to aogcc.permitting@alaska.gov
325-068
By Gavin Gluyas at 2:18 pm, Feb 10, 2025
Digitally signed by Sara
Hannegan (2519)
DN: cn=Sara Hannegan (2519)
Date: 2025.02.10 13:35:31 -
09'00'
Sara Hannegan
(2519)
21,465' SFD 3,859 SFD
SFD 2/17/2025 DSR-2/18/25
10-404
* BOPE test to 2500 psi.
MGR04MAR2025*&:
3/4/2025Jessie L.
Chmielowski
Digitally signed by Jessie L.
Chmielowski
Date: 2025.03.04 14:16:05 -09'00'
RBDMS JSB 030625
RWO
Well: OP09-S01
Well Name:OP09-S01 API Number:50-029-23448-60-00
Current Status:Offline ESP producer Permit to Drill Number:213-173
First Call Engineer:Ryan Rupert (907) 301-1736 (c)
Second Call Engineer:Keith Lopez (907) 903-5432 (c)
Maximum Expected BHP:1320 psi @ 3,542’ TVD (7.2ppg) 3/1/24 static (3 mos SI)
Max. Potential Surface Pressure: 966 psi Using 0.1 psi/ft
Brief Well Summary
OP09 is a dual lateral OA sand producer. It’s ESP failed in January-2025, and is ready for an ESP swap. It
recently passed a casing MIT, and all that is needed during this RWO is a yo-yo of the ESP.
The goal of this project is install a new / functional ESP and return the well to production
Pertinent wellbore information:
- Deviation
o Goes >70 degrees at 3134’ MD
o Sail angle: 83 degrees from 3400 – 12,800’ MD
- DLS: all <2 degree / 100’ between 9,200’ – 10,100’ MD (don’t set ESP deeper than 10,100’ MD)
-Last casing test: MIT of 9-5/8” casing PASSED from top liner (12,642’ MD) and above (2/9/24)
- Pertinent History:
o 2011: Drill and complete as single horizontal in OA sand
o 2014: Upper lateral added in OA sand
o March-2024: RWO ESP swap
4 cleanout runs into 5-1/2” upper lateral
Made it 1600’ in
1st 3 runs came back with 3.3bbls fill total (135’ in 5-1/2” liner)
4th run came back almost empty
9-5/8” casing MIT PASSED (see above)
New ESP and new 2-7/8” tubing run
o May-2024 RWO for ESP swap
2 cleanout runs into upper 5-1/2” lateral
Made it 1000’ in
Both runs came back empty
Run new ESP
o 7/27/24: gauges die downhole
o 1/2/25: ESP dies
RWO
Well: OP09-S01
RWO Procedure
1. MIRU Nordic #4
2. Circulate / kill well:
a. Work over fluid will be injection water (8.5ppg)
b. Ensure any wellbore fluids are fully displaced with KWF either via circulation or bullheading
c. 130% Tubing volume = 75bbls
d. 130% IA to ESP = 880bbls
e. 130% 9-5/8” Casing below ESP = 300bbl
3. Set BPV/TWC, ND tree, NU BOP stack (see attached)
a. Notify AOGCC 48 hours in advance for witness
b. Test to 250psi Low /2,500psi High / 2,500psi Annular
c. BOPE will be used as needed to circulate the well
d. If this is the first well for Nordic 4 and this stack, BOPE will need to be tested to full rated
working pressure
4. Pull BPV/TWC
5. BOLDS and unseat hanger
6. POOH laying down 2-7/8” ESP completion
7. Pickup ESP completion
a. Bottom ESP to be set at same location ±9,985’ MD
b. 2-7/8” Tubing will be re-used
8. Set BPV/TWC, ND BOP
9. NU tree and test, pull BPV/TWC
10. RDMO RWO crew and equipment
Attachments:
1. Current Well Schematic
2. Proposed Well Schematic
3. BOP schematic
Nikaitchuq Field
Well: OP09-S01/S01L1
Last Completed: 6/3/2024
PTD: 211-058 (Mainbore) / 213-173 (Lateral)
API #: 50-029-23448-00-00 (Mainbore)/60-00 (Lateral)
Casing
20”
13-3/8"
20" 9-5/8"
Size ID Top Btm
20" N/A Surface 160’
13-3/8" 12.415" Surface 2,325'
13-3/8" 9-5/8" 8.835” Surface 13,195'
5-1/2” 4.892” 12,986' 21,740'
5-12" 4.950” 12,642' 21,460'
2-7/8" 2.441” Surface 9,915’
No Top MD TVD Inc ID OD
1 9,869' 3,525' 82 2.205" 3.325"
9,917' 3,532' 81 2.323" 5.130"
9,918' 3,532' 81 NA 5.380"
9,935' 3,535' 81 NA 5.380"
9,945' 3,536' 81 NA 5.380"
9,948'3,537' 82 NA 7.625"
9,951' 3,537' 82 NA 5.130"
9,952' 3,537' 82 NA 5.130"
9,959' 3,539' 82 NA 5.130"
9,965' 3,539' 82 NA 5.620"
9,982' 3,542' 82 NA 4.500"
9,985' 3,542' 82 NA 6.625"
3 12,642' 3,870' 84 4.950" 5.5"
4 12,986' 3,902' 88 4.950" 5.5"
1
Motor Centralizer 6.625" OD
Sensor Downhole Zenith E7 Series
2
13,220'
30" hole, cement to surface
16" hole, Stg 1 – 430 bbls 10.7# ASL, Stg 2 –
75 bbls 12.5# DeepCrete
12-1/4" hole, 356 bbls 12.5# DeepCrete
CASING DETAIL
CEMENT DETAIL
Cement Details Hole MD
160'
2,340'
40#, L-80, Hyd 563Intermediate
Surface
Conductor
Type
68#, L-80, BTC
179#, X-65
JEWELRY DETAIL
Intake
Upper Seal
Wt/ Grade/ Conn
Tubing
Production (OP09-S01L1)
Production (OP09-S01)
TUBING DETAIL
6.4#, L-80
Lateral L1 Baker SLXP Liner Hanger/Packer
Mainbore Baker SLXP Liner Hanger/Packer
2
Schematic
Dual Lateral Producer with ESP Lift
2-7/8" XN Nipple
Discharge Head
Pump #2 - PMP 538PMSXD FLEX27 82 FER H6 12CRC
Pump #1- PMP 538PMSXD 20 GINPSHH H6 FER 12 CRC
Gas Separator
7-5/8" Motor Shroud with hanger, overall length 42.76' with 5.76' below centalizer
Lower Seal
MOTOR 562XP
15.5#, L-80, Hyd 521
17#, L-80, Hyd 521
Item
3
HAL 5-1/2" Oil Swell Packers
OA Sand
4
Lateral L1 5-1/2" Slotted liner to 21,460' MD/3,860' TVD, hole TD 21,465' MD
9-5/8"
OA Sand
Mainbore 5-1/2" Slotted liner to 21,740' MD/3,868' TVD, hole TD 22,370' MD
ESP power,
(2) 3/8"
Chem Line
00070 degree
inclination
@ ~3,134'
XN
Last edited by: DH 2/6/2025
Nikaitchuq Field
Well: OP09-S01/S01L1
Last Completed: 6/3/2024
PTD: 211-058 (Mainbore) / 213-173 (Lateral)
API #: 50-029-23448-00-00 (Mainbore)/60-00 (Lateral)
Casing
20”
13-3/8"
20" 9-5/8"
Size ID Top Btm
20" N/A Surface 160’
13-3/8" 12.415" Surface 2,325'
13-3/8" 9-5/8" 8.835” Surface 13,195'
5-1/2” 4.892” 12,986' 21,740'
5-12" 4.950” 12,642' 21,460'
2-7/8" 2.441” Surface 9,915’
No Top MD TVD Inc ID OD
1 ~9869 ~3524 ~82 2.205" 3.325"
2 ~9917 ~3532 ~81 2.323" 5.130"
3 12,642' 3,870' 84 4.950" 5.5"
4 12,986' 3,902' 88 4.950" 5.5"
1
3
HAL 5-1/2" Oil Swell Packers
OA Sand
4
Lateral L1 5-1/2" Slotted liner to 21,460' MD/3,860' TVD, hole TD 21,465' MD
9-5/8"
OA Sand
Mainbore 5-1/2" Slotted liner to 21,740' MD/3,868' TVD, hole TD 22,370' MD
Item
JEWELRY DETAIL
2-7/8" XN Nipple
ESP Components
Lateral L1 Baker SLXP Liner Hanger/Packer
Mainbore Baker SLXP Liner Hanger/Packer
2
Proposed Schematic
Dual Lateral Producer with ESP Lift
15.5#, L-80, Hyd 521
17#, L-80, Hyd 521
Wt/ Grade/ Conn
Tubing
Production (OP09-S01L1)
Production (OP09-S01)
TUBING DETAIL
6.4#, L-80
CEMENT DETAIL
Cement Details Hole MD
160'
2,340'
13,220'
30" hole, cement to surface
16" hole, Stg 1 – 430 bbls 10.7# ASL, Stg 2 –
75 bbls 12.5# DeepCrete
12-1/4" hole, 356 bbls 12.5# DeepCrete
CASING DETAIL
40#, L-80, Hyd 563Intermediate
Surface
Conductor
Type
68#, L-80, BTC
179#, X-65
ESP power,
(2) 3/8"
Chem Line
00070 degree
inclination
@ ~3,134'
XN
Last edited by: DH 2/6/2025
Nordic Rig #4
All 5000#
Annular
2-7/8”–5”
Superceded
Nordic Rig 4 ARRS 5M
Nordic Calista 02.24.2025
All Components 5,000 psi
BLIND/SHEAR RAMS
VBR RAMS
CHOKE
HCR
MANUAL
CHOKE
3" 5,000 PSI WP CHOKE LINEKILL
HCR
INSIDE
KILL3" 5,000 PSI WP KILL
LINE
Annular
2 7/8” x 5” VBR
Technical Report Title
Date
Client: ENI Petroleum
Field: Nikaitchuq
Rig: Nabors 245
Date: February 16, 2014
Surface Data Logging
End of Well Report
OP09-S1L1
OP09-S1L1 PB1
TABLE OF CONTENTS
1. General Information
2. Daily Summary
3. Days vs. Depth
4. After Action Review
5. Formation Tops
6. Mud Record
7. Bit Record
8. Morning Reports
9. Survey Report
Digital Data to include:
Final Log Files
Final End of Well Report
Final LAS Exports
Halliburton Log Viewer
EMF Log Viewer
GENERAL WELL INFORMATION
Company: ENI Petroleum
Rig: Nabors 245
Well: OP09-S1L1 & OP09-S1L1 PB1
Field: Nikaitchuq Project
Borough: North Slope Borough
State: Alaska
Country: United States
API Number: 50-029-23448-60-00 (OP09-S1L1)
50-029-23448-70-00 (OP09-S1L1 PB1)
Sperry Job Number: AK-XX-0901007074
Job Start Date: 29 December 2013
Spud Date: 12 January 2014
Total Depth: 21465’ MD, 3859’ TVD (OP09-S1L1)
17336’ MD, 3932’ TVD (OP09-S1L1 PB1)
North Reference: True
Declination: 19.570°
Dip Angle: 81.023°
Total Field Strength: 57627.325 nT
Date Of Magnetic Data: 18 December 2013
Wellhead Coordinates N: North 70° 30' 39.72502"
Wellhead Coordinates W: West 149° 51' 48.12714"
Drill Floor Elevation 53.40’
Ground Elevation: 12.20’
Permanent Datum: Mean Sea Level
SDL Engineers: Charles Sinn, Josiah Failing, Leif Hammes,
Douglas Acker
Company Geologist: Andrew Buchanan
Company Representatives: Bruce Simonson / Ben Perry
SSDS Unit Number: 121
DAILY SUMMARY
12/29/2013
SDL continues on location from previous well. Complete move and Rig Up over OP09-S1L1.
Transfer production H2O into pits. Rig up to bullhead down well.
12/30/2013
Bullhead down completed to kill well. Nipple down Tree and Nipple up BOPs. BOP body test
failed; well head fitting repaired. Second BOP test failed; a leak was found in the NT2
connection.
12/31/2013
Body test BOP to 2500 psi; lay down tools and Nipple down BOP. Attach elephant trunk to ESP
sheave. Pull hanger and fill hole at 10 bbl/hr.
01/01/2014
Pick up Baker spear; pull VIT JT. Tong hydraulic failure, run up new set. Shear lower GLM,
pump 100 bbls down annular. Trip out of hole with tubing to 5166’ MD.
01/02/2014
Continue to trip out with tubing to 2000 ft. Rig up slick line, pull slip stop, pull pack off and pump.
Retrieve pump trip out to 1288’ MD.; wait on Phase 3 weather conditions. Trip out to surface.
Load 4.5” drill pipe in shed; strap, tally, and prep for clean out run. Install and remove wear
bushings.
01/03/2014
Continue to prep 4.5” drill pipe. Pick up cleanout BHA. Trip into hole with 4.5” drill pipe for
cleanout run.
01/04/2014
Trip into hole, liner top found at 12988’ MD. Remove the ESP sheave/elephant trunk from
derrick. Trip out and lay down clean out BHA. Pick up and trip in 5’’ drill pipe with Baker packer
BHA.
01/05/2014
Continue to trip in and set packer at 12963’ MD. Packer failed bleed off test. Trip out of hole in
singles then pump 100 barrels with no return. Trip out to surface; begin to prep for wire line.
01/06/2014
Completed wire line rig up. Run CBL; fluid level at 1500’ MD, TOC at 9150’ MD. Rig down wire
line. Prepare milling BHA.
01/07/2014
Pick up and then rack milling BHA. Pressure tests the BOP. Pick up BHA and trip in with 4.5’’
drill pipe to 2250’ MD. Shallow hole test of MWD tools failed.
01/08/2014
Continue to trip into hole to 10800’ MD, MDW test still unsuccessful. Resume trip in, to 12966’
MD, attempt to circulate with no pressure and no returns. Trip out of hole, lay down BHA and
rack milling assembly.
01/09/2014
Pick up a Baker test packer and trip in from surface with 5’’ drill pipe to 12031’ MD.
01/10/2014
Continue to trip in with test packer to 12963’ MD. Test at 500 psi for 5 minutes, then fill kill line
and test backslide to 500 psi for 10 minutes. Trip out and lay down test packer. Pick up isolation
packer and trip into hole with 5’’ drill pipe to 11748’ MD.
01/11/2014
Continue to trip in with isolation packer to 12963’ MD. Conduct pressure test and set packer at
12898’ MD. Trip out to surface and lay down packer tools. Pick up milling BHA and Whip-stock
assembly.
01/12/2014
Pick up milling and Whip stock assembly. Trip in to 1504’ MD to condition mud and receive
positive test from MWD tools. Continue to trip in to 12854’ MD. Milled window as per Baker rep,
milled to 12835’ MD.
Gas: There was a max gas of 5 units from 12835’ MD with an average drilling gas of 2 units.
01/13/2014
Complete window from 12827’ MD to 12843’ MD. Drilled rat hole to 12867’ MD; then tripped out
to surface while installing Sliders on the stands. Lay down milling assembly.
Gas: There was a max gas of 12 units from 12867’ MD with an average drilling gas of 6 units.
01/14/2014
Service the top drive, crown, and draw works. Pick up mud motor BHA for the build section. Trip
in to hole, preform shallow MWD test, and continue to trip in to 12867’ MD. Rotate and slide drill
from 12867’ MD to 13136’ MD, back ream when finished drilling.
Gas: There was a max gas of 111 units from 13062’ MD with an average drilling gas of 33 units.
01/15/2014
Continue back ream from 12945’ MD to 12898’ MD @ 70 rpm, 2600 psi, and 12000 ft/lb torque.
Orient to high side; pump off through window with no over pull. Circulated and conditioned
before pumping dry-job, then trip out to surface. Lay down BHA before cut and slip job. Test
BOPs.
01/16/2014
Pick up BHA #8 (bit, Xceed, Telescope, AND). Schlumberger attempted to load source but
encountered problems. Trouble-shoot finding ice plug in tool. Trip in hole from 264' MD to 7872'
MD, run in with 4.5" DP and perform Shallow Hole Test, fill every 30 stands. Trip in hole to 9202'
MD and changed to elevators. Trip in hole 5" DP to 12742' MD. 20Klbs push to get through
window. MAD pass from 13029’ MD to 13225’ MD. Rotary drill from 13136’ MD to 13575' MD.
Currently drilling ahead.
Gas: There was a Max Gas of 712 units from 13436' MD with an Average Gas of 329 units
01/17/2014
Rotary drilling from 13572' MD to 15236' MD at 500-550 gpm, Parameters of Torque =14-16K,
Rpm =120, SPP= 2600-3150 psi. Currently drill ahead.
Gas: There was a Max Gas of 818 units from 13940' MD with an Average Gas of 377 unit
01/18/2014
Rotary drilling from 15236' MD to 15705' MD, circulate and condition as per ENI due to Phase 3
weather conditions. Continue drilling ahead
Gas: There was a Max Gas of 802 units from 16626' MD with an Average Gas of 461 units
01/19/2014
Rotary drilling from 16666' MD to 17336' MD, 3927' TVD; Pipe became stuck during a back
ream. Continue to work stuck pipe but unsuccessful. Plan forward for wire line unit on location at
08:00 hours to retrieve nuclear source and attempt to free rest of BHA.
Gas: There was a Max Gas of 635 units from 16706' MD with an Average Gas of 369 units
01/20/2014
Working stuck pipe, unsuccessful attempts to free the stuck pipe as per Co.Man and K&M rep.
Rig up Schlumberger wireline to retrieve nuclear source. Start in hole, pump down at 7.5 bpm
and 318 gpm, and 1700 psi. Wireline work believed to have latch up. Pull out of hole with source
and secure.
01/21/2014
Continue jarring down as per company man and fishing rep. Start jarring up as per company
man and fishing rep. Post-jar inspection of top drive and derrick. Continue jarring as per
company man and fishing rep. No success. Trapped 11k ftlbs torque in string for back off as per
Baker. Rig up wire line for string shot. Run in hole with wire line to 17167’ MD. Shoot at 17167’
MD. Trip out of hole with wire line. Rig down wire line to attempt to back off string. Currently rig
down wire line.
01/22/2014
Finish rig down of wire line. Apply Reverse Torque to drill string to 13.6k. Rig up for String Shot
#2 with 12strnd 960gr shot. Run in hole with wire line. Shot #2 while pumping 10bpm. Shot at
17139' MD. Trip out of hole with wire line. Jar Down with 14k torque per CoMan/Fishing Rep.
Unsuccessful. Apply Reverse Torque to drill string to 14k. Set Slips to trap torque. Rig up for
String Shot #3. Trip in hole with wire line. Shot #3 while pumping 10bpm. Run in hole with wire
line at the time of the report.
01/23/2014
Trip in hole with wire line String Shot #3 to 16974' MD. Shot at 16974' MD with 10strnd, 800gr.
Successful Break. Circulate bottoms up, pumped Dry Pill. Trip out of hole from 16936' MD to
12752' MD. Slip and Cut 98' drill line and perform Rig Service. Trip out of hole from 12752' MD
to 11702' MD. Lay down 3rd Party Wire line Tools. Trip out of hole from 11702' MD to 9883' MD.
Lay down Drill Pipe from 9883' MD to 8928' MD.
01/24/2014
Trip out of hole with 4.5" DP from 1775' MD to surface. Prepare Rig Floor for trip in hole. Pick up
BHA #3. Trip in hole from 658' MD to 1890' MD. Perform Shallow Hole Test T/670psi. Trip out of
hole for BOP Testing. Pick up Testing Tools. BOP PSI Test on 4.5" & 5" Test Joints and lay
down Testing Tools. Pick up BHA #3 from Derrick Rack. Perform directional Work on MWD.
Currently pick up BHA #3.
01/25/2014
Pick up BHA #3. Trip in hole from 278' MD to 1514' MD and perform shallow hole test. Trip in
hole with 4.5" DP from 1514' MD to 9200' MD. Trip in hole with 5" DP from 13325' MD to 14001'
MD. Wash and ream from 14001' MD to 16300' MD. Downlink with directional tools. Control drill
open hole sidetrack from 16300' MD to 16380' MD @ 30 fph. Currently control drilling.
Gas: There was a max gas while time drilling of 13 units from 16320' MD.
01/26/2014
Controlled drill from 16300' MD to 16387' MD as per DD at 30 ROP. Pull back to 16300' MD and
control drill from 16300' MD to 16394' MD per DD at 15 ROP. Drill from 16394' MD to 17829'
MD. Currently drill ahead.
Gas: There was a max gas while drilling of 905u from 17690' MD with an Average Gas of 462
units
01/27/2014
Drill ahead from 17829' MD to 19488' MD at 400 gpm. Currently drill ahead.
Gas: There was a max gas while drilling of 1005u from 17973' MD and an average gas of
502u.
01/28/2014
Drill from 19488' MD to 20700' MD at 400gpm. Currently drill ahead.
Gas: There was a max gas while drilling of 788u from 19607' MD and an average gas of 447u.
01/29/2014
Drill from 20700' MD to TD at 21465' MD at 400 gpm. Circulate 3 bottoms up while back
reaming out of the hole. Back ream out of hole 1 stand per bottoms up at 450 gpm. Back ream
out of hole from 21465' MD to 20880' MD. Service rig, change out grabber box dies. Back ream
out of hole from 20880' MD to 20319' MD. Currently back ream out of hole.
Gas: There was a max gas while drilling of 739u from 20683' MD and an average gas of 469u.
01/30/2014
Back ream out of hole from 20319' MD to 13010' MD at 450 gpm. Trip out of hole through
window from 13101' MD to 12815' MD with no pumps and no rotation. Back ream out of hole
from 12815' MD to 11320' MD at 450 gpm. Continue to back ream out of hole until all 5" pipe is
on surface. Currently back ream out of hole.
Gas: There was a max gas while tripping of 36 units and an average gas of 21 units.
01/31/2014
Back ream out of hole from 11320' MD to 9408' MD at 450 gpm. Circulate 3 bottoms up at 1
stand per up at 450 gpm. Circulate until shakers are clean then slip and cut 118' drill line.
Perform rig service. Trip out of hole sideways Lay down 4.5" drill pipe from 9217' MD to 278'
MD. Lay down BHA #3. Pick up whipstock retrieval BHA.
Gas: No significant gas to report.
02/01/2014
Pick up Whipstock retrieval BHA. Trip in hole to 1607' MD and shallow hole test. Trip in hole
from 1607' MD to 12810' MD. Circulate and orientate tools. Hook into whipstock and release.
Circulate bottoms up. Trip out of hole from 12810' MD to 155' MD with whipstock assembly. Lay
down whipstock assembly. Rig up to run 5.5" slotted liner.
Gas: No significant gas to report.
02/02/2014
Lay down BHA and clean rig floor. Pick up 5.5" liner tools. Run in hole with 5.5" liner to 8747'
MD. Lay down Volant tools per GBR. Change out floor tools for Liner Hanger. Makeup hanger
assembly. Run in hole to 8820' MD. 8820' MD. Trip in hole with 5.5" liner on 5" drill pipe from
8820' MD to 10700' MD. Currently run liner.
Gas: No significant gas to report.
02/03/2014
Trip in hole with 5.5" liner on 5" drill pipe from 10700' MD to 12200' MD. Made everal attempts
to enter window. Trip in hole on 5” from 12900' MD to 21460' MD. Start rotating string at 18800'
MD. Tagged bottom at 21465' MD. Drop ball and seat ball at 1848 strokes. Displace wellbore
from 8.7 ppg MOBM to 8.7 ppg KCl Brine at 4-7 bpm. Trip out of hole and lay down 5" drill pipe
from 12631' MD to 7666' MD. Currently lay down drill pipe.
Gas: There was a max gas of 34 units while displacing.
02/04/2014
Trip out of hole sideways from 7666' MD to 4644' MD and lay down 5" drill pipe. Service rig. Trip
out of hole from 4644' MD to surface. Rig up to pull wear bushing. Pull wear bushing. Rig up to
run 4.5" tubing and ESP. Currently rigging up.
Gas: No significant gas.
02/05/2014
Run 4.5" tubing.
Gas: No significant gas.
02/06/2014
Run 4.5" tubing. Rig down volant tool. Pick up and makeup hanger and landing joint. Currently
rigging up hanger.
Gas: No significant gas.
12000
13000
14000
15000
16000
17000
18000
19000
20000
21000
22000
23000
0 5 10 15 20 25
Me
a
s
u
r
e
d
D
e
p
t
h
Rig Days
Prognosed
Actual
WELL NAME: OP09-S1L1 & OP09-S1L1 PB1
OPERATOR: Eni Petroleum
MUD CO: MI Swaco
RIG: Nabors 245E
SPERRY JOB: AK-AM-0901007074
Days vs. Depth
04 April 2013
Sperry SDL Arrived on Location
LOCATION: Nikaitchuq
AREA: North Slope Borough
STATE: Alaska
SPUD: 12-Jan-2014
TD: 28-Jan-2014
Commenced Milling Window
Hole Section
On Bot: 19:35 12 Jan 2014
Stuck Pipe @ 17336'
Jar/Fish Pipe, Plugback Hole
Jan 19 - 24 2014
Commenced 8.75" Sidetrack
Hole Section
On Bot 21:00 25 Jan 2014
TD Production Hole Section
21465' MD, 3859' TVD
Off Bot: 10:30 28 Jan 2014
WELL NAME:LOCATION:Nikaitchuq
OPERATOR:AREA:North Slope Borough
SPERRY JOB:STATE:Alaska
RIG:Nabors 245E HOLE SECTION Production
EMPLOYEE NAME:DATE:
Sperry Drilling Confidential Document v 3.0
Eni Petroleum
AK-AM-0900831473
Charles Sinn 6-Feb-2014
OP09-S1L1
What went as, or better than, planned:
N/A
Recommendations:
Innovations and/or cost savings:
This production drilling run was executed flawlessly without any issues at all.
Difficulties experienced:
All issues at oliktok point have been resolved. Proactive in troubleshooting to mitigate future problems.
N/A
Surface Data Logging
After Action Review
WELL NAME:OP09-S1L1 & OP09-S1L1 PB1 LOCATION:Nikaitchuq
OPERATOR:Eni Petroleum AREA:North Slope
MUD CO:MI Swaco STATE:Alaska
RIG:Nabors 245E SPUD:12-Jan-2014
SPERRY JOB:AK-XX-0901007074 TD:28-Jan-2014
Marker MD INC AZ TVD TVDSS
Shrader Bluff 10,643.0 81.4 354.2 3,626.7 -3,573.3
N Sequence Top 11,092.0 82.4 344.4 3,692.1 -3,638.7
N Sand Top 11,615.0 81.8 334.7 3,755.8 -3,702.4
N Bottom 12,017.0 83.2 326.5 3,804.0 -3,750.6
N Sequence Base 12,560.0 84.1 309.8 3,862.0 -3,808.6
Fault1 12,732.0 83.7 309.3 3,879.9 -3,826.5
OA-Sand Top 13,198.0 88.0 322.6 3,910.6 -3,857.2
OA-2 Top 13,959.0 89.2 313.6 3,923.2 -3,869.8
OA-2 Top 14,120.0 90.9 310.9 3,923.2 -3,869.8
OA-2 Top 14,357.0 88.7 304.8 3,923.2 -3,869.8
OA-3 Top 15,076.0 89.1 300.7 3,927.8 -3,874.4
OA-3 Top 15,551.0 92.8 298.2 3,928.1 -3,874.7
OA-2 Top 15,641.0 92.9 299.3 3,923.6 -3,870.2
OA-2 Top 16,369.0 89.0 304.3 3,922.9 -3,869.5
OA-3 Top 16,856.0 88.4 308.1 3,928.2 -3,874.8
Fault A 16,841.0 88.7 304.1 3,926.4 -3,883.0
OA-4 Top 17,146.0 89.4 298.1 3,944.6 -3,891.2
OA-4 Top 17,277.0 91.8 297.3 3,943.7 -3,890.3
OA-3 Top 18,159.0 91.8 299.5 3,920.3 -3,866.9
OA-2 Top 18,405.0 91.5 299.6 3,913.0 -3,859.6
OA-2 Top 19,125.0 90.2 302.1 3,904.3 -3,850.9
OA-3 Top 19,449.0 89.7 301.4 3,902.1 -3,848.7
OA-3 Top 20,509.0 92.5 304.4 3,873.8 -3,820.4
OA-2 Top 20,665.0 91.9 304.8 3,867.6 -3,814.2
OP-S1L1 PB1 Borehole
Sidetrack Pt 16,300.0 90.0 302.9 3,921.9 -3,868.5
OA-2 16,844.0 89.2 299.7 3,924.1 -3,870.7
OA-3 16,965.0 87.6 300.3 3,926.6 -3,873.2
Formation Tops
OP09-S1L1 & OP09-S1L1 PB1 Nikaitchuq
Eni Petroleum North Slope Borough
MI Swaco Alaska
Nabors 245E 12-Jan-2014
AK-XX-0901007074 28-Jan-2014
Date Depth Wt Vis PV YP Gels HTHP
R600/R300/R200/R100/R6
/R3 Cake Solids Oil/Water
Alka
POM
Excess
Lime Emul Stab
ft - MD ppg sec lb/100 lb/100ft2 m/30m Rheometer 32nds %%%ppb volts
12-Jan 12828 8.70 48 17 16 8/9/9 4.8 50/33/26/18 /1 7.2 70 1.50 1.95 459.0 Milling Window
13-Jan 12867 8.70 49 17 17 8/8/9 4.8 51/34/28/21/8/7 /1 8.0 70 1.60 2.08 577.0 M/U BHA #1
14-Jan 13072 8.70 50 14 19 8/9/9 4.8 47/33/28/22/10/8 /1 7.5 69 1.70 2.21 605.0 Drill Build Section with Motor
15-Jan 13136 8.70 50 15 19 8/9/9 4.8 49/34/27/21 /1 8.0 70 1.70 2.21 595.0 BOP Test
16-Jan 13193 8.70 47 15 19 8/9/9 4.8 49/34/27/21/8/7 /1 8.3 69 1.75 2.28 611.0 Rotary Drill Lateral with BHA #2
17-Jan 15040 8.70 47 13 23 8/9/9 4.9 49/36/28/21/8/7 /1 9.0 70 2.90 3.77 594.0 Rotary Drill Lateral with BHA #2
18-Jan 16545 8.75 48 17 15 8/9/9 5.2 49/32/27/21/8/7 /1 9.5 71 2.50 3.25 544.0 Rotary Drill Lateral with BHA #2
19-Jan 17336 8.70 47 15 18 8/9/9 5.2 48/33/27/20/8/6 /1 9.1 70 1.90 2.47 544.0 Work Stuck Pipe
20-Jan 17336 8.75 49 15 19 8/9/9 5.2 49/34/28/21/8/7 /1 10.0 70 2.20 2.86 519.0 Wire Line POOH Nuclear Source
21-Jan 17336 8.75 51 13 22 8/8/9 5.0 48/35/27/20/8/7 /1 10.0 70 2.20 2.86 478.0 Rig Down Wireline
22-Jan 17336 8.70 53 13 21 8/8/9 4.8 47/34/27/21/8/7 /1 10.0 71 2.25 2.93 557.0 RIH with Wireline
23-Jan 17336 8.75 55 15 21 8/9/9 4.9 51/36/29/22/8/7 /1 10.0 71 2.05 2.67 544.0 TOOH with 16974' Twist Off Pipe
24-Jan 17336 8.90 60 15 21 8/8/9 4.2 51/36/29/22/8/7 /1 9.5 71 2.05 2.67 490.0 Prepare to TIH with BHA #3
Date Depth Wt Vis PV YP Gels HTHP
R600/R300/R200/R100/R6
/R3 Cake Solids Oil/Water
Alka
POM
Excess
Lime Emul Stab Remarks
ft - MD ppg sec lb/100 lb/100ft2 m/30m Rheometer 32nds %%ml ppb volts
25-Jan 17336 8.85 56 14 20 8/9/9 4.7 48/34/28/21 1 8.63 62 2.05 2.67 530 Control Drilling with BHA #3
26-Jan 17540 8.7 51 15 20 8/9/9 4.0 50/35/29/22/9/8 1 8.55 64 2.25 2.93 520 Rotary Drill Lateral with BHA #3
27-Jan 19365 8.7 47 14 16 7/7/8 5.4 44/30/25/19/8/ 7 1 7.66 71 2 2.6 460 Rotary Drill Lateral with BHA #3
28-Jan 20565 8.7 46 15 15 6/7/7 5.6 39/27/22/16/7/6 1 8.62 73 2 2.6 470 Rotary Drill Lateral with BHA #3
29-Jan 21465 8.75 46 13 14 7/7/8 5.6 40/27/22/16/7/6 1 8.58 66 1.75 2.28 485 BROOH t/window
30-Jan 21465 8.65 46 12 15 7/7/8 5.6 39/27/22/17/7/6 1 7.42 65 2 2.6 520 BROOH
31-Jan 21465 8.7 46 12 15 7/7/8 5.8 39/27/21/16/7/6 1 7.5 66 1.95 2.54 505 RIH t/pull whipstock
1-Feb 21465 8.7 45 12 15 7/7/8 5.8 39/27/22/16/7/6 1 9 66 2 2.6 500 R/U for 5.5" Liner
2-Feb 21465 8.7 27 -----------RIH w/5.5" Liner
3-Feb 21465 8.7 27 -----------TOOH L/D 5" DP
Casing Record
Remarks
20" Conductor @ 160' MD, 160'TVD
13 3/8" Casing @ 2325' MD, 2159'TVD
9.625" Casing to TOW @ 12827' MD, 3890'TVD
5.5" Liner @ 21465' MD, 3859'TVD
LOCATION:
AREA:
STATE:
SPUD:
TD:
WELL NAME:
OPERATOR:
MUD CO:
RIG:
SPERRY JOB:
W
a
t
e
r
a
n
d
O
i
l
B
a
s
e
d
M
u
d
R
e
c
o
r
d
BHA#SDL
RUN #Bit #Bit Type Bit
Size Depth In Depth Out Footage Bit
Hours TFA AVG
ROP
WOB
(max)
RPM
(max)
SPP
(max)
FLOW GPM
(max)Bit Grade Comments
1 400 1 Milled Tooth XR+8.75"`12867 13136 269'4.10 0.746 65.7 13.6 24 2275 444 1-1-WT-A-E-I-NO-BHA Drill window
2 500 2 MDSi616 Smith 8.75'13136 17335 4199 23.10 0.902 125.0 14.1 131 2352 444 -Stuck In Hole
3 600 3 MDSi616 Smith 8.75'16300 21465 5165 51.60 0.902 100.1 14 120 2200 450 1-1-WT-A-X-I-NO-TD Production TD
WELL NAME:OP09-S1L1 & OP09-S1L1 PB1 LOCATION:Nikaitchuq
OPERATOR:Eni Petroleum AREA:North Slope
MUD CO:
SPERRY JOB:AK-XX-0901007074 TD:28-Jan-2014
MI Swaco STATE:Alaska
RIG:Nabors 245E SPUD:12-Jan-2014
B
i
t
R
e
c
o
r
d
.
.
*
24 hr Recap:
(max)(current)
0
0
Cly
0
Set AtSize Grade
907-685-1490Unit Phone:
0
Josiah Failing
Maximum
Report By:Logging Engineers:J. Failing / C. Sinn
0
0
Units*
Casing
Summary
Lithology (%)
0
MBT
0'
pH
0
0
0
Siltst
SPP (psi)
Gallons/stroke
TFABit Type
Depth
27
C-5nC-2
in
Minimum
Depth
Time:
8.7 ppg. Bullhead down tubing. R/U to bullhead down annulus.
-
-
-
Max @ ft Current
Date:
Avg
to0'
Yesterday's Depth:
Current Depth:
24 Hour Progress:
Flow In (gpm)
Flow In (spm)
Gas Summary
0
0 0
(current)
Simonson / Sherman
ShClyst TuffGvlCoal
cP
Footage
Ss
(ppb Eq)
C-1 C-5i
AK-AM-0901007074
Bullhead Down Annulus
PV
24 hr Max
Weight
0
Hours
C-3
00
CementChtSilt
C-4i C-4n
YP
(lb/100ft2)
000
Brine
Depth in / out
Mud Type
Lst
Type
Average
Background (max)Trip
Avg Min
Comments
RPM
ECD
(ppg)
ml/30min
Tools
API FL
Chromatograph (ppm)
WOB
100% Gas In Air=10,000 UnitsConnection
0
No Gas readings.
ConditionBit #
8.70
Size
Job No.:
Daily Charges:
Total Charges:
MWD Summary
96%
Rig Activity:
Nabors 245E Report For:
Morning Report Report # 1
Customer:
Well:
Area:
Location:
Rig:
OP09-S1L1
Eni Petroleum
Nikaitchuq Field
Oliktok Point
ROP
ROP (ft/hr)
4.23 @
Mud Data
Depth
29-Dec-2013
12:00 AM
Current Pump & Flow Data:
Max
0
Chlorides
mg/l
49500.00
Completed moving rig onto OP09-S1L1. R/U substructure, pits. Transfer 9.1 ppg brine f/ truck t/ pi ts. Dilute to
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com)
.
.
*
24 hr Recap:Completed bullheading to kill well. Monitor well. R/D Bullheading tools. N/D tree, N/U BOPs. Per form BOP body
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
Chlorides
mg/l
49500.00
0
30-Dec-2013
12:00 AM
Current Pump & Flow Data:
Max
ROP
ROP (ft/hr)
4.23 @
Mud Data
Depth
Morning Report Report # 2
Customer:
Well:
Area:
Location:
Rig:
OP09-S1L1
Eni Petroleum
Nikaitchuq Field
Oliktok Point
Job No.:
Daily Charges:
Total Charges:
MWD Summary
96%
Rig Activity:
Nabors 245E Report For:
ConditionBit #
8.70
Size
No Gas readings.
100% Gas In Air=10,000 UnitsConnection
0
Tools
API FL
Chromatograph (ppm)
WOB
Avg Min
Comments
RPM
ECD
(ppg)
ml/30min
Background (max)Trip
Average
Mud Type
Lst
Type
Brine
Depth in / out
YP
(lb/100ft2)
000
00
CementChtSilt
C-4i C-4n
24 hr Max
Weight
0
Hours
C-3
Ss
(ppb Eq)
C-1 C-5i
AK-AM-0901007074
L/D BOP Stack
PV
Footage
Simonson / Sherman
ShClyst TuffGvlCoal
cP
Gas Summary
0
0 0
(current)
Avg
to0'
Yesterday's Depth:
Current Depth:
24 Hour Progress:
Flow In (gpm)
Flow In (spm)
-
-
-
Max @ ft Current
Date:
Time:
test, failed. Repaired wellhead fitting. Perform body test, failed. Found leak in NT2 connection. N/D BOP Stack.
in
Minimum
Depth C-5nC-2
SPP (psi)
Gallons/stroke
TFABit Type
Depth
27
MBT
0'
pH
0
0
0
Siltst
Units*
Casing
Summary
Lithology (%)
00
0
907-685-1490Unit Phone:
0
Josiah Failing
Maximum
Report By:Logging Engineers:J. Failing / C. Sinn
Set AtSize Grade
(max)(current)
0
0
Cly
0
You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com)
.
.
*
24 hr Recap:
(max)(current)
0
0
Cly
0
Set AtSize Grade
907-685-1490Unit Phone:
0
Josiah Failing
Maximum
Report By:Logging Engineers:J. Failing / C. Sinn
0
0
Units*
Casing
Summary
Lithology (%)
0
MBT
0'
pH
0
0
0
Siltst
SPP (psi)
Gallons/stroke
TFABit Type
Depth
27
C-5nC-2
in
Minimum
Depth
Time:
catch curtain. R/U elephant trunk to ESP sheave. Thread pulling rope to ground level. P/U 3rd par ty tools to rig floor. N/D
-
-
-
Max @ ft Current
Date:
Avg
to0'
Yesterday's Depth:
Current Depth:
24 Hour Progress:
Flow In (gpm)
Flow In (spm)
Gas Summary
0
0 0
(current)
Simonson / Sherman
ShClyst TuffGvlCoal
cP
Footage
Ss
(ppb Eq)
C-1 C-5i
AK-AM-0901007074
Unseat Hanger
PV
24 hr Max
Weight
0
Hours
C-3
00
CementChtSilt
C-4i C-4n
YP
(lb/100ft2)
000
Brine
Depth in / out
Mud Type
Lst
Type
Average
Background (max)Trip
Avg Min
Comments
RPM
ECD
(ppg)
ml/30min
Tools
API FL
Chromatograph (ppm)
WOB
100% Gas In Air=10,000 UnitsConnection
0
No Gas readings.
BOPs, R/U and open BPV, monitor well and pull BPV. R/U and pull hanger, well on vacuum. Fill 10 bb ls/hr.
ConditionBit #
8.70
Size
Job No.:
Daily Charges:
Total Charges:
MWD Summary
96%
Rig Activity:
Nabors 245E Report For:
Morning Report Report # 3
Customer:
Well:
Area:
Location:
Rig:
OP09-S1L1
Eni Petroleum
Nikaitchuq Field
Oliktok Point
ROP
ROP (ft/hr)
4.23 @
Mud Data
Depth
31-Dec-2013
12:00 AM
Current Pump & Flow Data:
Max
0
Chlorides
mg/l
49000.00
N/U and test BOPs. Body test to 2500 psi. Test BOPs, annular. L/D test tool and blow down. Finis h R/D, install
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com)
.
.
*
24 hr Recap:P/U Baker spear to pull VIT JT. Speared and pulled VIT JT, L/D VIT. Tong hydraulic failure, R/D R/U new set.
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
Chlorides
mg/l
46500.00
0
1-Jan-2014
12:00 AM
Current Pump & Flow Data:
Max
ROP
ROP (ft/hr)
4.23 @
Mud Data
Depth
Morning Report Report # 4
Customer:
Well:
Area:
Location:
Rig:
OP09-S1L1
Eni Petroleum
Nikaitchuq Field
Oliktok Point
Job No.:
Daily Charges:
Total Charges:
MWD Summary
96%
Rig Activity:
Nabors 245E Report For:
ConditionBit #
8.70
Size
No Gas readings.
annular. TOOH w/ tubing t/ 5166'.
100% Gas In Air=10,000 UnitsConnection
0
Tools
API FL
Chromatograph (ppm)
WOB
Avg Min
Comments
RPM
ECD
(ppg)
ml/30min
Background (max)Trip
Average
Mud Type
Lst
Type
Brine
Depth in / out
YP
(lb/100ft2)
000
00
CementChtSilt
C-4i C-4n
24 hr Max
Weight
0
Hours
C-3
Ss
(ppb Eq)
C-1 C-5i
AK-AM-0901007074
TOOH w/ Tubing
PV
Footage
Simonson / Sherman
ShClyst TuffGvlCoal
cP
Gas Summary
0
0 0
(current)
Avg
to0'
Yesterday's Depth:
Current Depth:
24 Hour Progress:
Flow In (gpm)
Flow In (spm)
-
-
-
Max @ ft Current
Date:
Time:
TOOH f/ 9933' MD with tubing. Get cap line/ESP through sheives, TOOH w/ rubing. Shear lower GLM, pump 100 bbls down
in
Minimum
Depth C-5nC-2
SPP (psi)
Gallons/stroke
TFABit Type
Depth
27
MBT
0'
pH
0
0
0
Siltst
Units*
Casing
Summary
Lithology (%)
00
0
907-685-1490Unit Phone:
0
Josiah Failing
Maximum
Report By:Logging Engineers:J. Failing / C. Sinn
Set AtSize Grade
(max)(current)
0
0
Cly
0
You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com)
.
.
*
24 hr Recap:
(max)(current)
0
0
Cly
0
Set AtSize Grade
907-685-1490Unit Phone:
0
Josiah Failing
Maximum
Report By:Logging Engineers:J. Failing / C. Sinn
0
0
Units*
Casing
Summary
Lithology (%)
0
MBT
0'
pH
0
0
0
Siltst
SPP (psi)
Gallons/stroke
TFABit Type
Depth
27
C-5nC-2
in
Minimum
Depth
Time:
tubing stop. RIH, retrieve pack off, RIH retrieve pump. TOOH w/ tubing t/ 1288' MD. Wait on weath er, Phase 3 conditions. TOOH
No Gas Readings.
-
-
-
Max @ ft Current
Date:
Avg
to0'
Yesterday's Depth:
Current Depth:
24 Hour Progress:
Flow In (gpm)
Flow In (spm)
Gas Summary
0
0 0
(current)
Simonson / Sherman
ShClyst TuffGvlCoal
cP
Footage
Ss
(ppb Eq)
C-1 C-5i
AK-AM-0901007074
TOOH w/ Tubing
PV
24 hr Max
Weight
0
Hours
C-3
00
CementChtSilt
C-4i C-4n
YP
(lb/100ft2)
000
Brine
Depth in / out
Mud Type
Lst
Type
Average
Background (max)Trip
Avg Min
Comments
RPM
ECD
(ppg)
ml/30min
Tools
API FL
Chromatograph (ppm)
WOB
100% Gas In Air=10,000 UnitsConnection
0
set wear ring as per Vetco. Prep 4.5" DP and clean out run BHA.
w/ tubing t/ surface. L/D 3rd party tools, stage equipment. Load 4.5" DP in shed. Strap and prep. Install/remove wear bushing
ConditionBit #
8.70
Size
Job No.:
Daily Charges:
Total Charges:
MWD Summary
96%
Rig Activity:
Nabors 245E Report For:
Morning Report Report # 5
Customer:
Well:
Area:
Location:
Rig:
OP09-S1L1
Eni Petroleum
Nikaitchuq Field
Oliktok Point
ROP
ROP (ft/hr)
4.23 @
Mud Data
Depth
2-Jan-2014
12:00 AM
Current Pump & Flow Data:
Max
0
Chlorides
mg/l
46500.00
TOOH w/ tubing t/ 2000' MD. R.U Slick line to pull stop/pack off/pump. Slick line RIH, tag @ 1903'. RIH to retrieve
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com)
.
.
*
24 hr Recap:Continue prepping 4.5" DP. P/U cleanout BHA. P/U DP and RIH w/ cleanout BHA.
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
Chlorides
mg/l
46500.00
0
3-Jan-2014
12:00 AM
Current Pump & Flow Data:
Max
ROP
ROP (ft/hr)
4.23 @
Mud Data
Depth
Morning Report Report # 6
Customer:
Well:
Area:
Location:
Rig:
OP09-S1L1
Eni Petroleum
Nikaitchuq Field
Oliktok Point
Job No.:
Daily Charges:
Total Charges:
MWD Summary
96%
Rig Activity:
Nabors 245E Report For:
ConditionBit #
8.70
Size
No Gas Readings.
100% Gas In Air=10,000 UnitsConnection
0
Tools
API FL
Chromatograph (ppm)
WOB
Avg Min
Comments
RPM
ECD
(ppg)
ml/30min
Background (max)Trip
Average
Mud Type
Lst
Type
Brine
Depth in / out
YP
(lb/100ft2)
000
00
CementChtSilt
C-4i C-4n
24 hr Max
Weight
0
Hours
C-3
Ss
(ppb Eq)
C-1 C-5i
AK-AM-0901007074
RIH w/ Cleanout BHA
PV
Footage
Simonson / Sherman
ShClyst TuffGvlCoal
cP
Gas Summary
0
0 0
(current)
Avg
to0'
Yesterday's Depth:
Current Depth:
24 Hour Progress:
Flow In (gpm)
Flow In (spm)
-
-
-
Max @ ft Current
Date:
Time:
in
Minimum
Depth C-5nC-2
SPP (psi)
Gallons/stroke
TFABit Type
Depth
27
MBT
0'
pH
0
0
0
Siltst
Units*
Casing
Summary
Lithology (%)
00
0
907-685-1490Unit Phone:
0
Josiah Failing
Maximum
Report By:Logging Engineers:J. Failing / D. Acker
Set AtSize Grade
(max)(current)
0
0
Cly
0
You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com)
.
.
*
24 hr Recap:
(max)(current)
0
0
Cly
0
Set AtSize Grade
907-685-1490Unit Phone:
0
Josiah Failing
Maximum
Report By:Logging Engineers:J. Failing / D. Acker
0
0
Units*
Casing
Summary
Lithology (%)
0
MBT
0'
pH
0
0
0
Siltst
SPP (psi)
Gallons/stroke
TFABit Type
Depth
27
C-5nC-2
in
Minimum
Depth
Time:
TOOH, change elevators/slips. L/D Baker clean out BHA, P/U Baker packer BHA. TIH w/ DP.
-
-
-
Max @ ft Current
Date:
Avg
to0'
Yesterday's Depth:
Current Depth:
24 Hour Progress:
Flow In (gpm)
Flow In (spm)
Gas Summary
0
0 0
(current)
Simonson / Sherman
ShClyst TuffGvlCoal
cP
Footage
Ss
(ppb Eq)
C-1 C-5i
AK-AM-0901007074
TIH w/ Drill Pipe
PV
24 hr Max
Weight
0
Hours
C-3
00
CementChtSilt
C-4i C-4n
YP
(lb/100ft2)
000
Brine
Depth in / out
Mud Type
Lst
Type
Average
Background (max)Trip
Avg Min
Comments
RPM
ECD
(ppg)
ml/30min
Tools
API FL
Chromatograph (ppm)
WOB
100% Gas In Air=10,000 UnitsConnection
0
No Gas Readings
ConditionBit #
8.70
Size
Job No.:
Daily Charges:
Total Charges:
MWD Summary
96%
Rig Activity:
Nabors 245E Report For:
Morning Report Report # 7
Customer:
Well:
Area:
Location:
Rig:
OP09-S1L1
Eni Petroleum
Nikaitchuq Field
Oliktok Point
ROP
ROP (ft/hr)
4.23 @
Mud Data
Depth
4-Jan-2014
12:00 AM
Current Pump & Flow Data:
Max
0
Chlorides
mg/l
47000.00
P/U 4.5" DP. Found liner top @ 12988' MD. L/D 3rd party tools. Remove ESP sheaver/elephant trunk from derrick.
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com)
.
.
*
24 hr Recap:P/U 5" DP. Set packer @ 12963' MD. Seat ball. Attempt to test packer. Failed bleed off test. R/D packer testing
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
Chlorides
mg/l
47000.00
0
5-Jan-2014
12:00 AM
Current Pump & Flow Data:
Max
ROP
ROP (ft/hr)
4.23 @
Mud Data
Depth
Morning Report Report # 8
Customer:
Well:
Area:
Location:
Rig:
OP09-S1L1
Eni Petroleum
Nikaitchuq Field
Oliktok Point
Job No.:
Daily Charges:
Total Charges:
MWD Summary
96%
Rig Activity:
Nabors 245E Report For:
ConditionBit #
8.70
Size
No Gas Readings.
top drive. Begin R/U for wireline.
100% Gas In Air=10,000 UnitsConnection
0
Tools
API FL
Chromatograph (ppm)
WOB
Avg Min
Comments
RPM
ECD
(ppg)
ml/30min
Background (max)Trip
Average
Mud Type
Lst
Type
Brine
Depth in / out
YP
(lb/100ft2)
000
00
CementChtSilt
C-4i C-4n
24 hr Max
Weight
0
Hours
C-3
Ss
(ppb Eq)
C-1 C-5i
AK-AM-0901007074
R/U for Wireline
PV
Footage
Simonson / Sherman
ShClyst TuffGvlCoal
cP
Gas Summary
0
0 0
(current)
Avg
to0'
Yesterday's Depth:
Current Depth:
24 Hour Progress:
Flow In (gpm)
Flow In (spm)
-
-
-
Max @ ft Current
Date:
Time:
equipment. TOOH, L/D singles 5" DP. Pump 100 bbls, no returns. Blow down top drive. TOOH t/ surf ace. L/D BHA. Service
in
Minimum
Depth C-5nC-2
SPP (psi)
Gallons/stroke
TFABit Type
Depth
27
MBT
0'
pH
0
0
0
Siltst
Units*
Casing
Summary
Lithology (%)
00
0
907-685-1490Unit Phone:
0
Josiah Failing
Maximum
Report By:Logging Engineers:J. Failing / D. Acker
Set AtSize Grade
(max)(current)
0
0
Cly
0
You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com)
.
.
*
24 hr Recap:
(max)(current)
0
0
Cly
0
Set AtSize Grade
907-685-1490Unit Phone:
0
Josiah Failing
Maximum
Report By:Logging Engineers:J. Failing / D. Acker
0
0
Units*
Casing
Summary
Lithology (%)
0
MBT
0'
pH
0
0
0
Siltst
SPP (psi)
Gallons/stroke
TFABit Type
Depth
27
C-5nC-2
in
Minimum
Depth
Time:
Prep whipstock BHA.
-
-
-
Max @ ft Current
Date:
Avg
to0'
Yesterday's Depth:
Current Depth:
24 Hour Progress:
Flow In (gpm)
Flow In (spm)
Gas Summary
0
0 0
(current)
Simonson / Sherman
ShClyst TuffGvlCoal
cP
Footage
Ss
(ppb Eq)
C-1 C-5i
AK-AM-0901007074
Prep Whipstock BHA
PV
24 hr Max
Weight
0
Hours
C-3
00
CementChtSilt
C-4i C-4n
YP
(lb/100ft2)
000
Brine
Depth in / out
Mud Type
Lst
Type
Average
Background (max)Trip
Avg Min
Comments
RPM
ECD
(ppg)
ml/30min
Tools
API FL
Chromatograph (ppm)
WOB
100% Gas In Air=10,000 UnitsConnection
0
No Gas Readings
ConditionBit #
8.70
Size
Job No.:
Daily Charges:
Total Charges:
MWD Summary
96%
Rig Activity:
Nabors 245E Report For:
Morning Report Report # 9
Customer:
Well:
Area:
Location:
Rig:
OP09-S1L1
Eni Petroleum
Nikaitchuq Field
Oliktok Point
ROP
ROP (ft/hr)
4.23 @
Mud Data
Depth
6-Jan-2014
12:00 AM
Current Pump & Flow Data:
Max
0
Chlorides
mg/l
48000.00
Complete R/U wireline. Run wireline CBL. Fluid level @ 1500'. TOC @ 9150'. R/D wireline unit. S lip and cut.
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com)
.
.
*
24 hr Recap:Picked up milling BHA and racked back. Tested BOP's to 250psi low and 3500psi high. LD test tools; Picked up BHA
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
Chlorides
mg/l
48000.00
0
7-Jan-2014
12:00 AM
Current Pump & Flow Data:
Max
ROP
ROP (ft/hr)
4.23 @
Mud Data
Depth
Morning Report Report # 9
Customer:
Well:
Area:
Location:
Rig:
OP09-S1L1
Eni Petroleum
Nikaitchuq Field
Oliktok Point
Job No.:
Daily Charges:
Total Charges:
MWD Summary
96%
Rig Activity:
Nabors 245E Report For:
ConditionBit #
8.70
Size
No Gas Readings
100% Gas In Air=10,000 UnitsConnection
0
Tools
API FL
Chromatograph (ppm)
WOB
Avg Min
Comments
RPM
ECD
(ppg)
ml/30min
Background (max)Trip
Average
Mud Type
Lst
Type
Brine
Depth in / out
YP
(lb/100ft2)
000
00
CementChtSilt
C-4i C-4n
24 hr Max
Weight
0
Hours
C-3
Ss
(ppb Eq)
C-1 C-5i
AK-AM-0901007074
TIH w/ Whipstock
PV
Footage
Simonson / Sherman
ShClyst TuffGvlCoal
cP
Gas Summary
0
0 0
(current)
Avg
to0'
Yesterday's Depth:
Current Depth:
24 Hour Progress:
Flow In (gpm)
Flow In (spm)
-
-
-
Max @ ft Current
Date:
Time:
assemble and TIH w/ Baker Whipstock. TIH with 4.5" DP f/157' t/2250'. Failed shallow hole test of M WD tool.
in
Minimum
Depth C-5nC-2
SPP (psi)
Gallons/stroke
TFABit Type
Depth
27
MBT
0'
pH
0
0
0
Siltst
Units*
Casing
Summary
Lithology (%)
00
0
907-685-1490Unit Phone:
0
Douglas Acker
Maximum
Report By:Logging Engineers:D. Acker / L. Hammas
Set AtSize Grade
(max)(current)
0
0
Cly
0
You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com)
.
.
*
24 hr Recap:Trip in hole F/2345' T10800' to attempt shallow hole. Unsuccessful test contiued TIH F/10800 T/12966 '. Circulated
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
Chlorides
mg/l
47000.00
0
8-Jan-2014
12:00 AM
Current Pump & Flow Data:
Max
ROP
ROP (ft/hr)
4.23 @
Mud Data
Depth
Morning Report Report # 11
Customer:
Well:
Area:
Location:
Rig:
OP09-S1L1
Eni Petroleum
Nikaitchuq Field
Oliktok Point
Job No.:
Daily Charges:
Total Charges:
MWD Summary
96%
Rig Activity:
Nabors 245E Report For:
ConditionBit #
8.70
Size
No Gas Readings
assembly.
100% Gas In Air=10,000 UnitsConnection
0
Tools
API FL
Chromatograph (ppm)
WOB
Avg Min
Comments
RPM
ECD
(ppg)
ml/30min
Background (max)Trip
Average
Mud Type
Lst
Type
Brine
Depth in / out
YP
(lb/100ft2)
000
00
CementChtSilt
C-4i C-4n
24 hr Max
Weight
0
Hours
C-3
Ss
(ppb Eq)
C-1 C-5i
AK-AM-0901007074
TIH w/ Whipstock
PV
Footage
Simonson / Sherman
ShClyst TuffGvlCoal
cP
Gas Summary
0
0 0
(current)
Avg
to0'
Yesterday's Depth:
Current Depth:
24 Hour Progress:
Flow In (gpm)
Flow In (spm)
-
-
-
Max @ ft Current
Date:
Time:
70 bbls down hole and saw no pressure. TOOH F/ 12966 T2250'. L/D 4,5" singles F/ 1395' T/157". L/D B HA and racked back milling
in
Minimum
Depth C-5nC-2
SPP (psi)
Gallons/stroke
TFABit Type
Depth
27
MBT
0'
pH
0
0
0
Siltst
Units*
Casing
Summary
Lithology (%)
00
0
907-685-1490Unit Phone:
0
Douglas Acker
Maximum
Report By:Logging Engineers:D. Acker / L. Hammas
Set AtSize Grade
(max)(current)
0
0
Cly
0
You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com)
.
.
*
24 hr Recap:
(max)(current)
0
0
Cly
0
Set AtSize Grade
907-685-1490Unit Phone:
0
Douglas Acker
Maximum
Report By:Logging Engineers:D. Acker / L. Hammas
0
0
Units*
Casing
Summary
Lithology (%)
0
MBT
0'
pH
0
0
0
Siltst
SPP (psi)
Gallons/stroke
TFABit Type
Depth
27
C-5nC-2
in
Minimum
Depth
Time:
TIH w/ 5' DP F/10698 T/12031.
-
-
-
Max @ ft Current
Date:
Avg
to0'
Yesterday's Depth:
Current Depth:
24 Hour Progress:
Flow In (gpm)
Flow In (spm)
Gas Summary
0
0 0
(current)
Simonson / Sherman
ShClyst TuffGvlCoal
cP
Footage
Ss
(ppb Eq)
C-1 C-5i
AK-AM-0901007074
TIH w/ new packer
PV
24 hr Max
Weight
0
Hours
C-3
00
CementChtSilt
C-4i C-4n
YP
(lb/100ft2)
000
Brine
Depth in / out
Mud Type
Lst
Type
Average
Background (max)Trip
Avg Min
Comments
RPM
ECD
(ppg)
ml/30min
Tools
API FL
Chromatograph (ppm)
WOB
100% Gas In Air=10,000 UnitsConnection
0
No Gas Readings
ConditionBit #
8.70
Size
Job No.:
Daily Charges:
Total Charges:
MWD Summary
96%
Rig Activity:
Nabors 245E Report For:
Morning Report Report # 12
Customer:
Well:
Area:
Location:
Rig:
OP09-S1L1
Eni Petroleum
Nikaitchuq Field
Oliktok Point
ROP
ROP (ft/hr)
4.23 @
Mud Data
Depth
9-Jan-2014
12:00 AM
Current Pump & Flow Data:
Max
0
Chlorides
mg/l
47500.00
L/D whipstock BHA; Picked up Baker Retrievable packer. TIH w/ 5' DP F/21' T9780' ; TIH w/ 5" DP F/97 80' T/10698'
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com)
.
.
*
24 hr Recap:TIH to 12963' W/ packer. Test to 500 psi for 10 mins. Fill thru kill line, test backside to 500 psi. for 10 mins
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
Chlorides
mg/l
47500.00
0
10-Jan-2014
12:00 AM
Current Pump & Flow Data:
Max
ROP
ROP (ft/hr)
4.23 @
Mud Data
Depth
Morning Report Report # 13
Customer:
Well:
Area:
Location:
Rig:
OP09-S1L1
Eni Petroleum
Nikaitchuq Field
Oliktok Point
Job No.:
Daily Charges:
Total Charges:
MWD Summary
96%
Rig Activity:
Nabors 245E Report For:
ConditionBit #
8.70
Size
No Gas Readings
100% Gas In Air=10,000 UnitsConnection
0
Tools
API FL
Chromatograph (ppm)
WOB
Avg Min
Comments
RPM
ECD
(ppg)
ml/30min
Background (max)Trip
Average
Mud Type
Lst
Type
Brine
Depth in / out
YP
(lb/100ft2)
000
00
CementChtSilt
C-4i C-4n
24 hr Max
Weight
0
Hours
C-3
Ss
(ppb Eq)
C-1 C-5i
AK-AM-0901007074
TIH w/ new packer
PV
Footage
Simonson / Sherman
ShClyst TuffGvlCoal
cP
Gas Summary
0
0 0
(current)
Avg
to0'
Yesterday's Depth:
Current Depth:
24 Hour Progress:
Flow In (gpm)
Flow In (spm)
-
-
-
Max @ ft Current
Date:
Time:
TOOH. Lay down packer. P/U DP. Picked up Isolation packer. TIH t/11748'
in
Minimum
Depth C-5nC-2
SPP (psi)
Gallons/stroke
TFABit Type
Depth
27
MBT
0'
pH
0
0
0
Siltst
Units*
Casing
Summary
Lithology (%)
00
0
907-685-1490Unit Phone:
0
Douglas Acker
Maximum
Report By:Logging Engineers:D. Acker / L. Hammas
Set AtSize Grade
(max)(current)
0
0
Cly
0
You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com)
.
.
*
24 hr Recap:
(max)(current)
0
0
Cly
0
Set AtSize Grade
907-685-1490Unit Phone:
0
Douglas Acker
Maximum
Report By:Logging Engineers:D. Acker / L. Hammas
0
0
Units*
Casing
Summary
Lithology (%)
0
MBT
0'
pH
0
0
0
Siltst
SPP (psi)
Gallons/stroke
TFABit Type
Depth
27
C-5nC-2
in
Minimum
Depth
Time:
L/D BHA and packer setting tools. P/U BHA and Whipstock assembly.
-
-
-
Max @ ft Current
Date:
Avg
to0'
Yesterday's Depth:
Current Depth:
24 Hour Progress:
Flow In (gpm)
Flow In (spm)
Gas Summary
0
0 0
(current)
Simonson / Sherman
ShClyst TuffGvlCoal
cP
Footage
Ss
(ppb Eq)
C-1 C-5i
AK-AM-0901007074
P/U Whipstock BHA
PV
24 hr Max
Weight
0
Hours
C-3
00
CementChtSilt
C-4i C-4n
YP
(lb/100ft2)
000
Brine
Depth in / out
Mud Type
Lst
Type
Average
Background (max)Trip
Avg Min
Comments
RPM
ECD
(ppg)
ml/30min
Tools
API FL
Chromatograph (ppm)
WOB
100% Gas In Air=10,000 UnitsConnection
0
No Gas Readings
ConditionBit #
8.70
Size
Job No.:
Daily Charges:
Total Charges:
MWD Summary
96%
Rig Activity:
Nabors 245E Report For:
Morning Report Report # 14
Customer:
Well:
Area:
Location:
Rig:
OP09-S1L1
Eni Petroleum
Nikaitchuq Field
Oliktok Point
ROP
ROP (ft/hr)
4.23 @
Mud Data
Depth
11-Jan-2014
12:00 AM
Current Pump & Flow Data:
Max
0
Chlorides
mg/l
47500.00
TIH w/ Isolation Packer f/11765' t/12963'. Pressure test and set packer at 12898'. TOOH f/12898' t/24'
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com)
.
.
*
24 hr Recap:P/U Milling and Whipstock assembly. TIH t/1504' and shallow hole test MWD. Circuate and condition th e mud
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
Chlorides
mg/l
25500.00
0
12-Jan-2014
12:00 AM
Current Pump & Flow Data:
1460
Max
ROP
ROP (ft/hr)
4.23 @
Mud Data
Depth
Morning Report Report # 14
Customer:
Well:
Area:
Location:
Rig:
OP09-S1L1
Eni Petroleum
Nikaitchuq Field
Oliktok Point
Job No.:
Daily Charges:
Total Charges:
MWD Summary
96%
Rig Activity:
Nabors 245E Report For:
ConditionBit #
7.28.708.70
Size
There was a Max Gas of 5 units from 12835' MD with an Average Gas of 2 units
milled window f/ 12828' t12835'
12828'
100% Gas In Air=10,000 Units0Connection
0
Tools
HTHP FL
Chromatograph (ppm)
WOB
Casing
Avg Min
Comments
RPM
ECD
(ppg)
ml/30min
0Background (max)Trip
Average
N/A
Mud Type
Lst
Type
Brine 4.812828'16
Depth in / out
YP
(lb/100ft2)
000
00
CementChtSilt
C-4i C-4n
24 hr Max
Weight
0
Hours
C-3
Ss
(ppb Eq)
C-1 C-5i
AK-AM-0901007074
Milling out window
PV
Footage
Simonson / Sherman
ShClyst TuffGvlCoal
cP
17
Gas Summary
0
0 0
(current)
Avg
to0'
Yesterday's Depth:
Current Depth:
24 Hour Progress:
5.2 Flow In (gpm)
Flow In (spm)
12828'
12835'
7'
Max @ ft Current
12835'3.0
Date:
Time:
system. TIH f/1594'' t/4800' and then serviced the rig. Continued TIH f/4800' t/12854'. Oreintate Wh ipstock 15 degrees left and set.
3
in
0 12828'Minimum
Depth C-5n
12835'
1.0
C-2
5
SPP (psi)
Gallons/stroke
TFABit Type
Depth
48
MBT
0'
pH
0
0
0
Siltst
423
100
Units*
Casing
Summary
Lithology (%)
0425
0
907-685-1490Unit Phone:
0
Douglas Acker
Maximum
Report By:Logging Engineers:D. Acker / L. Hammas
Set AtSize
40.0
Grade
9.63''
(max)(current)
0
0
Cly
752
You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com)
.
.
*
24 hr Recap:
(max)(current)
0
0
Cly
369
Set AtSize
40.0
Grade
9.63''
907-685-1490Unit Phone:
0
Douglas Acker
Maximum
Report By:Logging Engineers:D. Acker / L. Hammas
227
0
423
100
Units*
Casing
Summary
Lithology (%)
0
MBT
0'
pH
0
0
0
Siltst
SPP (psi)
Gallons/stroke
TFABit Type
Depth
48
C-5n
12867'
0.0
C-2
12
in
0 12835'Minimum
Depth
Time:
while installinf Sliders on stands 121-79. L/D Milling Assembly.
6
12835'
12867'
32'
Max @ ft Current
12852'6.5
Date:
Avg
to0'
Yesterday's Depth:
Current Depth:
24 Hour Progress:
11.1 Flow In (gpm)
Flow In (spm)
Gas Summary
0
0 0
(current)
Simonson / Sherman
ShClyst TuffGvlCoal
cP
17
Footage
Ss
(ppb Eq)
C-1 C-5i
AK-AM-0901007074
Milling out window
PV
24 hr Max
Weight
0
Hours
C-3
00
CementChtSilt
C-4i C-4n
YP
(lb/100ft2)
000
FazePro 4.812867'17
Depth in / out
Mud Type
Lst
Type
Average
N/A0Background (max)Trip
Avg Min
Comments
RPM
ECD
(ppg)
ml/30min
Tools
HTHP FL
Chromatograph (ppm)
WOB
Casing
100% Gas In Air=10,000 Units0Connection
0
There was a Max Gas of 12 units from 12867' MD with an Average Gas of 6 units
12828'
ConditionBit #
8.08.708.70
Size
Job No.:
Daily Charges:
Total Charges:
MWD Summary
96%
Rig Activity:
Nabors 245E Report For:
Morning Report Report # 16
Customer:
Well:
Area:
Location:
Rig:
OP09-S1L1
Eni Petroleum
Nikaitchuq Field
Oliktok Point
ROP
ROP (ft/hr)
4.23 @
Mud Data
Depth
13-Jan-2014
12:00 AM
Current Pump & Flow Data:
1460
Max
0
Chlorides
mg/l
25000.00
Cut and completed window f/12827' t12843'. Drilled rat hole f/12843' t12867'. TOOH f/12230' t/surfac e
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com)
.
.
*
24 hr Recap:L/D Mill BHA; Service top drive, crown, and draworks. P/U Mud Motor BHA for build section. TIH f/ 15 55' t11126'
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
Chlorides
mg/l
30500.00
4
14-Jan-2014
12:00 AM
Current Pump & Flow Data:
2275
Max
ROP
ROP (ft/hr)
4.23 @
Mud Data
Depth
Morning Report Report # 17
Customer:
Well:
Area:
Location:
Rig:
OP09-S1L1
Eni Petroleum
Nikaitchuq Field
Oliktok Point
Job No.:
Daily Charges:
Total Charges:
MWD Summary
96%
Rig Activity:
Nabors 245E Report For:
ConditionBit #
1
7.5
8.57"
8.70
Milled Tooth XR+
8.70
Size
There was a Max Gas of 111 units from 13062' MD with an Average Gas of 33 units
12828'
100% Gas In Air=10,000 Units0Connection
14
Tools
HTHP FL
Chromatograph (ppm)
13.612867' 13136'
WOB
Casing
Avg Min
Comments
RPM
ECD
(ppg)
ml/30min
29Background (max)Trip
Average
N/A
Mud Type
Lst
Type
24.0
FazePro 4.813072'19
Depth in / out
YP
(lb/100ft2)
020
00
CementChtSilt
C-4i C-4n
24 hr Max
Weight
13
Hours
C-3
Ss
(ppb Eq)
C-1 C-5i
AK-AM-0901007074
TOOH for smart BHA
PV
269'
Footage
4.10
Simonson / Sherman
ShClyst TuffGvlCoal
cP
14
Gas Summary
0
9 4
(current)
Avg
to0'
Yesterday's Depth:
Current Depth:
24 Hour Progress:
83.3 Flow In (gpm)
Flow In (spm)
12867'
13136'
269'
Max @ ft Current
12933'171.0
Date:
Time:
preform shallow hole test and continue TIH t/12862'. Rotate and Slide drill f/12867' t/13136'. Back ream f/13132' t12945'.
33
in
0 12867'Minimum
Depth C-5n
13062'
0.0
C-2
111
SPP (psi)
Gallons/stroke
TFABit Type
Depth
50
MBT
0'
pH
0.746
0
9
0
Siltst
444
104
Units*
Casing
Summary
Lithology (%)
33762
0
907-685-1490Unit Phone:
0
Douglas Acker
Maximum
Report By:Logging Engineers:D. Acker / L. Hammes
Set AtSize
40.0
Grade
9.63''
(max)(current)
58
0
Cly
13439
You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com)
.
.
*
24 hr Recap:
(max)(current)
0
0
Cly
0
Set AtSize
40.0
Grade
9.63''
907-685-1490Unit Phone:
0
Douglas Acker
Maximum
Report By:Logging Engineers:D. Acker / L. Hammes
0
0
0
0
Units*
Casing
Summary
Lithology (%)
0
MBT
0'
pH
0.746
0
0
0
Siltst
SPP (psi)
Gallons/stroke
TFABit Type
Depth
50
C-5n
0'
0.0
C-2
0
No Gas Readings.
in
0 0'Minimum
Depth
Time:
T/12450 and orient to high side, pump off through window with no overpull. After window, pump out @ 100 gpm
0
13136'
13136'
0'
Max @ ft Current
0'0.0
Date:
Avg
to0'
Yesterday's Depth:
Current Depth:
24 Hour Progress:
0.0 Flow In (gpm)
Flow In (spm)
Gas Summary
0
0 4
(current)
Simonson / Sherman
ShClyst TuffGvlCoal
cP
15
269'
8.75 0.902
Footage
4.10
Ss
(ppb Eq)
C-1 C-5i
AK-AM-0901007074
P/U BHA #2 Xceed
PV
24 hr Max
Weight
0
Hours
C-3
00
CementChtSilt
C-4i C-4n
YP
(lb/100ft2)
000
24.0
Smith MDSi616
FazePro 4.8
13136'
13136'19
Depth in / out
Mud Type
Lst
Type
Average
N/A0Background (max)Trip
Avg Min
Comments
RPM
ECD
(ppg)
ml/30min
Tools
HTHP FL
Chromatograph (ppm)
13.612867' 13136'
WOB
Casing
100% Gas In Air=10,000 Units0Connection
0
2
draw works and top drive.Test BOPs.
taking returns to trip tank. L/D BHA & heavy wall before Cutting 120' drilling line, 16 wraps, adjus t brakes, serviced
380 psi. Circulated and Conditioned before pumping dry-job. Blow down top-drive and TOOH F/12450 T/1 078
12828'
ConditionBit #
1
8.0
8.75"
8.70
Milled Tooth XR+
8.70
Size
Job No.:
Daily Charges:
Total Charges:
MWD Summary
96%
Rig Activity:
Nabors 245E Report For:
Morning Report Report # 18
Customer:
Well:
Area:
Location:
Rig:
OP09-S1L1
Eni Petroleum
Nikaitchuq Field
Oliktok Point
ROP
ROP (ft/hr)
4.23 @
Mud Data
Depth
15-Jan-2014
12:00 AM
Current Pump & Flow Data:
0
Max
0
Chlorides
mg/l
30500.00
Backreaming F/12945 T/12898 @ 70 rpm 500 gpm 2600 psi and TQ=12K. Reaming/Washing F/12898
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com)
.
.
*
24 hr Recap:P/U BHA #8, bit, Xceed, Telescope, ADN, SLB attempted to load source but Replaced but still unsucces sful,
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
Chlorides
mg/l
30250.00
72
16-Jan-2014
12:00 AM
Current Pump & Flow Data:
3122
Max
ROP
ROP (ft/hr)
4.23 @
Mud Data
Depth
Morning Report Report # 19
Customer:
Well:
Area:
Location:
Rig:
OP09-S1L1
Eni Petroleum
Nikaitchuq Field
Oliktok Point
Job No.:
Daily Charges:
Total Charges:
MWD Summary
96%
Rig Activity:
Nabors 245E Report For:
Condition
1-1-WT-A-E-I-NO-BHA
Bit #
1
8.3
8.75"
8.70
Milled Tooth XR+
8.70
Size
2
T/13575'. 120 rpm, 550 gpm, 3200 psi, TQ=14.5, WOB=8K. Drilling Ahead
T/9202' and changed elevators. 5" DP T/12742'. 20K to get through window. MadPass F/13029 T/13225. R otary drilling F/13136
12828'
100% Gas In Air=10,000 Units0Connection
113
Tools
HTHP FL
Chromatograph (ppm)
13.612867' 13136'
WOB
Casing
Avg Min
Comments
RPM
ECD
(ppg)
ml/30min
32Background (max)Trip
Average
0
Mud Type
Lst
Type
24.0
Smith MDSi616
FazePro 4.8
13136'
13193'19
Depth in / out
YP
(lb/100ft2)
94319
06
CementChtSilt
C-4i C-4n
24 hr Max
Weight
252
Hours
C-3
Ss
(ppb Eq)
C-1 C-5i
AK-AM-0901007074
Drilling ahead
PV
269'
8.75 0.902
Footage
4.10
Simonson / Sherman
ShClyst TuffGvlCoal
cP
15
Gas Summary
3
68 32
(current)
Avg
to0'
Yesterday's Depth:
Current Depth:
24 Hour Progress:
338.5 Flow In (gpm)
Flow In (spm)
13136'
13572'
436'
Max @ ft Current
13428'204.0
Date:
Time:
trouble-shoot finding ice plug in tool. TIH F/264' T/7872', run in with 4.5" and perform Shallow Hol e Test, fill every 30 stands. TIH
329
There was a Max Gas of 712 units from 13436' MD with an Average Gas of 329 units
in
4 0'Minimum
Depth C-5n
0'
261.0
C-2
712
SPP (psi)
Gallons/stroke
TFABit Type
Depth
47
MBT
0'
pH
0.746
5
70
5
Siltst
550
130
Units*
Casing
Summary
Lithology (%)
4547347
523
907-685-1490Unit Phone:
16
Douglas Acker
Maximum
Report By:Logging Engineers:D. Acker / L. Hammes
Set AtSize
40.0
Grade
9.63''
(max)(current)
386
6
Cly
73041
You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com)
.
.
*
24 hr Recap:
(max)(current)
504
53
Cly
93067
Set AtSize
40.0
Grade
9.63''
907-685-1490Unit Phone:
32
Douglas Acker
Maximum
Report By:Logging Engineers:D. Acker / L. Hammes
40360
4500
516
122
Units*
Casing
Summary
Lithology (%)
94
MBT
15236'
pH
0.746
32
113
38
Siltst
SPP (psi)
Gallons/stroke
TFABit Type
Depth
47
C-5n
13940'
93.1
C-2
818
in
48 14850'Minimum
Depth
Time:
2600-3150 psi. Drilling ahead
377
There was a Max Gas of 818 units from 13940' MD with an Average Gas of 377 units
13572'
15236'
1664'
Max @ ft Current
14680'185.7
Date:
Avg
to12136'
Yesterday's Depth:
Current Depth:
24 Hour Progress:
338.5 Flow In (gpm)
Flow In (spm)
Gas Summary
35
111 61
(current)
Simonson / Sherman
ShClyst TuffGvlCoal
cP
13
269'
8.75 0.902
Footage
4.10
Ss
(ppb Eq)
C-1 C-5i
AK-AM-0901007074
Drilling ahead
PV
24 hr Max
Weight
311
Hours
C-3
2145
CementChtSilt
C-4i C-4n
YP
(lb/100ft2)
349961
24.0
Smith MDSi616
FazePro 4.9
13136'
15040'23
Depth in / out
Mud Type
Lst
Type
Average
N/A58Background (max)Trip
9.979.97
Avg Min
Comments
RPM
ECD
(ppg)
ml/30min
Tools
Xceed 675, Telescope 825
HTHP FL
Chromatograph (ppm)
13.612867' 13136'
WOB
Casing
100% Gas In Air=10,000 Units0Connection
152
2
12828'
Condition
1-1-WT-A-E-I-NO-BHA
Bit #
1
9.0
8.75"
8.75
Milled Tooth XR+
8.75
Size
Job No.:
Daily Charges:
Total Charges:
MWD Summary
96%
Rig Activity:
9.97
Nabors 245E Report For:
Morning Report Report # 20
Customer:
Well:
Area:
Location:
Rig:
OP09-S1L1
Eni Petroleum
Nikaitchuq Field
Oliktok Point
ROP
ROP (ft/hr)
4.23 @
Mud Data
Depth
17-Jan-2014
12:00 AM
Current Pump & Flow Data:
2837
Max
120
Chlorides
mg/l
29500.00
Rotary drilling F/13572' T/15236' @ 500-550 gpm, TQ=14-16K, RPM=120, 2600-3150 psi. Drilling ahead
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com)
.
.
*
24 hr Recap:Rotary drilling F/15236' T/15705', circulate and condition as per ENI due to Phase 3 weather conditi ons.
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
Chlorides
mg/l
29000.00
151
18-Jan-2014
12:00 AM
Current Pump & Flow Data:
3280
Max
ROP
ROP (ft/hr)
4.23 @
Mud Data
Depth
Morning Report Report # 21
Customer:
Well:
Area:
Location:
Rig:
OP09-S1L1
Eni Petroleum
Nikaitchuq Field
Oliktok Point
Job No.:
Daily Charges:
Total Charges:
MWD Summary
96%
Rig Activity:
9.97
Nabors 245E Report For:
Condition
1-1-WT-A-E-I-NO-BHA
Bit #
1
9.5
8.75"
8.75
Milled Tooth XR+
8.75
Size
2
12828'
100% Gas In Air=10,000 Units0Connection
195
Tools
Xceed 675, Telescope 825
HTHP FL
Chromatograph (ppm)
13.612867' 13136'
WOB
Casing
9.979.97
Avg Min
Comments
RPM
ECD
(ppg)
ml/30min
58Background (max)Trip
Average
N/A
Mud Type
Lst
Type
24.0
Smith MDSi616
FazePro 5.2
13136'
16545'15
Depth in / out
YP
(lb/100ft2)
3510562
2479
CementChtSilt
C-4i C-4n
24 hr Max
Weight
434
Hours
C-3
Ss
(ppb Eq)
C-1 C-5i
AK-AM-0901007074
Drilling ahead
PV
269'
8.75 0.902
Footage
9.41
4.10
Simonson / Sherman
ShClyst TuffGvlCoal
cP
17
Gas Summary
47
152 88
(current)
Avg
to12136'
Yesterday's Depth:
Current Depth:
24 Hour Progress:
381.2 Flow In (gpm)
Flow In (spm)
15236'
16705'
1469'
Max @ ft Current
15627'212.9
Date:
Time:
Continue drilling ahead
461
There was a Max Gas of 802 units from 16626' MD with an Average Gas of 461 units
in
69 16295'Minimum
Depth C-5n
16626'
309.0
C-2
802
SPP (psi)
Gallons/stroke
TFABit Type
Depth
48
MBT
16705'
pH
0.746
91
148
76
Siltst
546
129
Units*
Casing
Summary
Lithology (%)
10563584
14920
907-685-1490Unit Phone:
48
Douglas Acker
Maximum
Report By:Logging Engineers:D. Acker / L. Hammes
Set AtSize
40.0
Grade
9.63''
(max)(current)
528
181
Cly
87876
You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com)
.
.
*
24 hr Recap:
(max)(current)
495
12
Cly
71327
Set AtSize
40.0
Grade
9.63''
907-685-1490Unit Phone:
50
Douglas Acker
Maximum
Report By:Logging Engineers:D. Acker / L. Hammes
41456
1199
0
0
Units*
Casing
Summary
Lithology (%)
103
MBT
17337'
pH
0.746
10
153
18
Siltst
SPP (psi)
Gallons/stroke
TFABit Type
Depth
47
C-5n
16706'
0.0
C-2
635
in
8 16940'Minimum
Depth
Time:
but unsuccessful. Plan for wireline unit on location at 08:00 hours to retrieve nuclear source and attempt to free rest of BHA.
369
There was a Max Gas of 635 units from 16706' MD with an Average Gas of 369 units
16705'
17337'
632'
Max @ ft Current
17103'181.5
Date:
Avg
to12136'
Yesterday's Depth:
Current Depth:
24 Hour Progress:
397.0 Flow In (gpm)
Flow In (spm)
Gas Summary
18
157 93
(current)
Simonson / Sherman
ShClyst TuffGvlCoal
cP
15
269'
8.75 0.902
Footage
29.31
4.10
Ss
(ppb Eq)
C-1 C-5i
AK-AM-0901007074
Drilling ahead
PV
24 hr Max
Weight
280
Hours
C-3
1321
CementChtSilt
C-4i C-4n
YP
(lb/100ft2)
4111074
24.0
Smith MDSi616
FazePro 5.2
13136'
17336'18
Depth in / out
Mud Type
Lst
Type
Average
N/A76Background (max)Trip
9.979.97
Avg Min
Comments
RPM
ECD
(ppg)
ml/30min
Tools
Xceed 675, Telescope 825
HTHP FL
Chromatograph (ppm)
13.612867' 13136'
WOB
Casing
100% Gas In Air=10,000 Units0Connection
197
2
12828'
Condition
1-1-WT-A-E-I-NO-BHA
Bit #
1
9.1
8.75"
8.70
Milled Tooth XR+
8.70
Size
Job No.:
Daily Charges:
Total Charges:
MWD Summary
96%
Rig Activity:
9.97
Nabors 245E Report For:
Morning Report Report # 22
Customer:
Well:
Area:
Location:
Rig:
OP09-S1L1
Eni Petroleum
Nikaitchuq Field
Oliktok Point
ROP
ROP (ft/hr)
4.23 @
Mud Data
Depth
19-Jan-2014
12:00 AM
Current Pump & Flow Data:
0
Max
110
Chlorides
mg/l
28000.00
Rotary drilling F/16666' T/17336' TVD=3927'; Pipe became stuck during a back reem. Continue to work stuck pipe
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com)
.
.
*
24 hr Recap: Working stuck pipe, unsuccessful attempts to free the stuck pipe as per Co.Man and K&M rep
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
Chlorides
mg/l
27500.00
110
20-Jan-2014
12:00 AM
Current Pump & Flow Data:
0
Max
ROP
ROP (ft/hr)
4.23 @
Mud Data
Depth
Morning Report Report # 23
Customer:
Well:
Area:
Location:
Rig:
OP09-S1L1
Eni Petroleum
Nikaitchuq Field
Oliktok Point
Job No.:
Daily Charges:
Total Charges:
MWD Summary
96%
Rig Activity:
9.97
Nabors 245E Report For:
Condition
1-1-WT-A-E-I-NO-BHA
Bit #
1
10.0
8.75"
8.70
Milled Tooth XR+
8.70
Size
2
line. POOH with source and secure.
@ 7.5 bpm, 318 gpm, and 1700 psi. Wireline work believed to have latch up, POOH F/17180'md, R/D B/D cement
12828'
100% Gas In Air =10,000 Units 0Connection
197
Tools
Xceed 675, Telescope 825
HTHP FL
Chromatograph (ppm)
13.6 12867' 13136'
WOB
Casing
9.97 9.97
Avg Min
Comments
RPM
ECD (ppg)
ml/30min
0Background
(max)
Trip
Average
0
Mud Type
Lst
Type
24.0
Smith MDSi616
FazePro 5.2
13136'
17336'19
Depth in / out
YP
(lb/100ft 2)
41 110 74
13 21
Cement Cht Silt
C-4i C-4n
24 hr Max
Weight
280
Hours
C-3
Ss
(ppb Eq)
C-1 C-5i
AK-AM-0901007074
Working stuck pipe
PV
269'
8.75 0.902
Footage
29.31
4.10
Simonson / Sherman
Sh Clyst Tuff Gvl Coal
cP
15
Gas Summary
18
157 93
(current)
Avg
to 12136'
Yesterday's Depth:
Current Depth:
24 Hour Progress:
0.0 Flow In (gpm)
Flow In (spm)
17337'
17337'
0'
Max @ ft Current
0'0.0
Date:
Time:
369
There is no gas to report at this time
in
8 16940'Minimum
Depth C-5n
16706'
0.0
C-2
635
SPP (psi)
Gallons/stroke
TFA Bit Type
Depth
49
MBT
17337'
pH
0.746
10
153
18
Siltst
0
0
Units*
Casing
Summary
Lithology (%)
103 41456
1199
907-685-1490 Unit Phone:
50
Douglas Acker
Maximum
Report By: Logging Engineers: D. Acker / L. Hammes
Set At Size
40.0
Grade
9.63''
(max) (current)
495
12
Cly
71327
.
.
*
24 hr Recap:
(max) (current)
0
0
Cly
0
Set At Size
40.0
Grade
9.63''
907-685-1490 Unit Phone:
0
Douglas Acker
Maximum
Report By: Logging Engineers: D. Acker / L. Hammes
0
0
0
0
Units*
Casing
Summary
Lithology (%)
0
MBT
17337'
pH
0.746
0
0
0
Siltst
SPP (psi)
Gallons/stroke
TFA Bit Type
Depth
51
C-5n
0'
0.0
C-2
0
in
0 0'Minimum
Depth
Time:
0
There is no gas to report at this time
17337'
17337'
0'
Max @ ft Current
0'0.0
Date:
Avg
to 12136'
Yesterday's Depth:
Current Depth:
24 Hour Progress:
0.0 Flow In (gpm)
Flow In (spm)
Gas Summary
0
0 0
(current)
Simonson / Sherman
Sh Clyst Tuff Gvl Coal
cP
13
269'
8.75 0.902
Footage
29.31
4.10
Ss
(ppb Eq)
C-1 C-5i
AK-AM-0901007074
R/D wireline
PV
24 hr Max
Weight
0
Hours
C-3
00
Cement Cht Silt
C-4i C-4n
YP
(lb/100ft 2)
000
24.0
Smith MDSi616
FazePro 5.0
13136'
17336'22
Depth in / out
Mud Type
Lst
Type
Average
00Background
(max)
Trip
9.97 9.97
Avg Min
Comments
RPM
ECD (ppg)
ml/30min
Tools
Xceed 675, Telescope 825
HTHP FL
Chromatograph (ppm)
13.6 12867' 13136'
WOB
Casing
100% Gas In Air =10,000 Units 0Connection
0
2
attempt Backoff of string. Rigging Down Wireline at the Report Time.
R/U Wireline for String Shot. RIH w/ Wireline T/17167' MD. Shot at 17167' MD TOOH w/ Wireline. R/D Wireline to
12828'
Condition
1-1-WT-A-E-I-NO-BHA
Bit #
1
10.0
8.75"
8.75
Milled Tooth XR+
8.75
Size
Job No.:
Daily Charges:
Total Charges:
MWD Summary
96%
Rig Activity:
9.97
Nabors 245E Report For:
Morning Report Report # 24
Customer:
Well:
Area:
Location:
Rig:
OP09-S1L1
Eni Petroleum
Nikaitchuq Field
Oliktok Point
ROP
ROP (ft/hr)
4.23 @
Mud Data
Depth
21-Jan-2014
12:00 AM
Current Pump & Flow Data:
0
Max
0
Chlorides
mg/l
29500.00
Continued Jarring Down per CM/Fishing Rep. Started Jarring Up per CM/Fishing Rep. Post-Jar Inspection of TDS
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
.
.
*
24 hr Recap: Finished R/D of Wireline. Applied Reverse Torque to DS to 13.6k. R/U for String Shot #2 w/ 12strnd 960gr shot
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
Chlorides
mg/l
39000.00
0
22-Jan-2014
12:00 AM
Current Pump & Flow Data:
0
Max
ROP
ROP (ft/hr)
4.23 @
Mud Data
Depth
Morning Report Report # 25
Customer:
Well:
Area:
Location:
Rig:
OP09-S1L1
Eni Petroleum
Nikaitchuq Field
Oliktok Point
Job No.:
Daily Charges:
Total Charges:
MWD Summary
96%
Rig Activity:
9.97
Nabors 245E Report For:
Condition
1-1-WT-A-E-I-NO-BHA
Bit #
1
10.0
8.75"
8.70
Milled Tooth XR+
8.70
Size
2
R/U for String Shot #3. TIH w/ wireline Shot #3 while pumping 10bpm. RIH w/ Wireline at the time of the report.
torque per CoMan/Fishing Rep Unsuccessful. Applied Reverse Torque to DS to 14k. Set Slips to trap torque.
12828'
100% Gas In Air =10,000 Units 0Connection
0
Tools
Xceed 675, Telescope 825
HTHP FL
Chromatograph (ppm)
13.6 12867' 13136'
WOB
Casing
9.97 9.97
Avg Min
Comments
RPM
ECD (ppg)
ml/30min
0Background
(max)
Trip
Average
0
Mud Type
Lst
Type
24.0
Smith MDSi616
FazePro 4.8
13136'
17336'21
Depth in / out
YP
(lb/100ft 2)
000
00
Cement Cht Silt
C-4i C-4n
24 hr Max
Weight
0
Hours
C-3
Ss
(ppb Eq)
C-1 C-5i
AK-AM-0901007074
R/D wireline
PV
269'
8.75 0.902
Footage
29.31
4.10
Simonson / Sherman
Sh Clyst Tuff Gvl Coal
cP
13
Gas Summary
0
0 0
(current)
Avg
to 12136'
Yesterday's Depth:
Current Depth:
24 Hour Progress:
0.0 Flow In (gpm)
Flow In (spm)
17337'
17337'
0'
Max @ ft Current
0'0.0
Date:
Time:
0
There is no gas to report at this time
in
0 0'Minimum
Depth C-5n
0'
0.0
C-2
0
SPP (psi)
Gallons/stroke
TFA Bit Type
Depth
53
MBT
17337'
pH
0.746
0
0
0
Siltst
0
0
Units*
Casing
Summary
Lithology (%)
00
0
907-685-1490 Unit Phone:
0
Douglas Acker
Maximum
Report By: Logging Engineers: D. Acker / L. Hammes
Set At Size
40.0
Grade
9.63''
(max) (current)
0
0
Cly
0
.
.
*
24 hr Recap:
(max) (current)
0
0
Cly
0
Set At Size
40.0
Grade
9.63''
907-685-1490 Unit Phone:
0
Douglas Acker
Maximum
Report By: Logging Engineers: D. Acker / L. Hammes
0
0
0
0
Units*
Casing
Summary
Lithology (%)
0
MBT
17337'
pH
0.746
0
0
0
Siltst
SPP (psi)
Gallons/stroke
TFA Bit Type
Depth
55
C-5n
0'
0.0
C-2
0
in
0 0'Minimum
Depth
Time:
0
There is no gas to report at this time
17337'
17337'
0'
Max @ ft Current
0'0.0
Date:
Avg
to 12136'
Yesterday's Depth:
Current Depth:
24 Hour Progress:
0.0 Flow In (gpm)
Flow In (spm)
Gas Summary
0
0 0
(current)
Simonson / Sherman
Sh Clyst Tuff Gvl Coal
cP
15
269'
8.75 0.902
Footage
29.31
4.10
Ss
(ppb Eq)
C-1 C-5i
AK-AM-0901007074
TOOH w/ Drill Pipe
PV
24 hr Max
Weight
0
Hours
C-3
00
Cement Cht Silt
C-4i C-4n
YP
(lb/100ft 2)
000
24.0
Smith MDSi616
FazePro 4.9
13136'
17336'21
N/A
Depth in / out
Mud Type
Lst
Type
Average
00Background
(max)
Trip
9.97 9.97
Avg Min
Comments
RPM
ECD (ppg)
ml/30min
Tools
Xceed 675, Telescope 825
HTHP FL
Chromatograph (ppm)
13.6 12867' 13136'
WOB
Casing
100% Gas In Air =10,000 Units 0Connection
0
2
MD. C/O to 4.5" tools. TOOH w/ 4.5" DP F/8928' T/1775' MD. Tripping Out @ Report Time. F/12752' T/11702' MD. L/D 3rd Party Wireline Tools. TOOH F/11702' T/9883' MD. L/D DP F/9883' T/8928'
12828'
Condition
1-1-WT-A-E-I-NO-BHA
Bit #
1
10.0
8.75"
8.75
Milled Tooth XR+
8.75
Size
Job No.:
Daily Charges:
Total Charges:
MWD Summary
96%
Rig Activity:
9.97
Nabors 245E Report For:
Morning Report Report # 26
Customer:
Well:
Area:
Location:
Rig:
OP09-S1L1
Eni Petroleum
Nikaitchuq Field
Oliktok Point
Abandoned
ROP
ROP (ft/hr)
4.23 @
Mud Data
Depth
23-Jan-2014
12:00 AM
Current Pump & Flow Data:
0
Max
0
Chlorides
mg/l
36000.00
TIH w/ Wirline String Shot #3 T/16974' MD. Shot @ 16974' MD w/ 10strnd, 800gr. Succesful Break. Circ
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
.
.
*
24 hr Recap: TOOH w/4.5" DP F/1775' T/Surface. Prep Rig Floor for TIH. P/U BHA #3. TIH F/658' T/1890' MD. Perform
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
Chlorides
mg/l
39500.00
0
24-Jan-2014
12:00 AM
Current Pump & Flow Data:
0
Max
ROP
ROP (ft/hr)
4.23 @
Mud Data
Depth
Morning Report Report # 27
Customer:
Well:
Area:
Location:
Rig:
OP09-S1L1
Eni Petroleum
Nikaitchuq Field
Oliktok Point
Job No.:
Daily Charges:
Total Charges:
MWD Summary
96%
Rig Activity:
9.97
Nabors 245E Report For:
Condition
Abandoned
Bit #
2
9.5
8.75
8.90
Smith MDSi616
8.90
Size
3
MD. C/O to 4.5" tools. TOOH w/ 4.5" DP F/8928' T/1775' MD. Tripping Out @ Report Time. L/D Testing Tools. P/U BHA #3 F/Derrick Rack. Directional Work on MWD. Picking up BHA at the time of this report.
12828'
100% Gas In Air =10,000 Units 0Connection
0
Tools
Xceed 675, Telescope 825
HTHP FL
Chromatograph (ppm)
13136' N/A
WOB
Casing
9.97 9.97
Avg Min
Comments
RPM
ECD
(ppg)
ml/30min
0Background
(max)
Trip
Average
0
Mud Type
Lst
Type
Smith MDSi616
FazePro 17336'21
Depth in / out
YP
(lb/100ft 2)
000
00
Cement Cht Silt
C-4i C-4n
24 hr Max
Weight
0
Hours
C-3
Ss
(ppb Eq)
C-1 C-5i
AK-AM-0901007074
TIH w/ BHA #3
PV
8.75 0.902
Footage
29.31
Simonson / Sherman
Sh Clyst Tuff Gvl Coal
cP
15
Gas Summary
0
0 0
(current)
Avg
to 12136'
Yesterday's Depth:
Current Depth:
24 Hour Progress:
0.0 Flow In (gpm)
Flow In (spm)
17337'
17337'
0'
Max @ ft Current
0'0.0
Date:
Time:
0
There is no gas to report at this time
in
0 0'Minimum
Depth C-5n
0'
0.0
C-2
0
SPP (psi)
Gallons/stroke
TFA Bit Type
Depth
60
MBT
17337'
pH
0.902
0
0
0
Siltst
0
0
Units*
Casing
Summary
Lithology (%)
00
0
907-685-1490 Unit Phone:
0
Douglas Acker
Maximum
Report By: Logging Engineers: D. Acker / L. Hammes
Set At Size
40.0
Grade
9.63''
(max) (current)
0
0
Cly
0
.
.
*
24 hr Recap:
(max)(current)
3
0
Cly
400
Set AtSize
40.0
Grade
9.63''
907-685-1490Unit Phone:
0
Charles Sinn
Maximum
Report By:Logging Engineers:C. Sinn / J. Failing
0
190
453
107
Units*
Casing
Summary
Lithology (%)
0
Oil / Water Akal
0.902
0
0
0
Siltst
SPP (psi)
Gallons/stroke
TFABit Type
Depth
2.256
C-5n
16320'
21.0
C-2
13
in
6 16302'Minimum
Depth
Time:
from 1514' MD to 9200' MD. Trip in hole with 5" DP from 13325' MD to 14001' MD. Wash and ream from 14001' MD to 16300' MD.
10
There was a max gas while time drilling of 13 units from 16320' MD.
16300'
16384'
84'
Max @ ft Current
16320'15.0
Date:
Avg
to16300'
Yesterday's Depth:
Current Depth:
24 Hour Progress:
23.0 Flow In (gpm)
Flow In (spm)
Gas Summary
0
0 0
(current)
Simonson / Sherman
ShClyst TuffGvlCoal
cP
14
4200'
8.75 0.902
Footage
29.31
Ss
Ratio
C-1 C-5i
AK-AM-0901007074
Openhole Sidetrack
PV
24 hr Max
Weight
0
Hours
C-3
00
CementChtSilt
C-4i C-4n
YP
(lb/100ft2)
2.05
000
120
Smith MDSi616
FazePro 4.7 @ 15017336'20
Depth in / out
Mud Type
Lst
Type
Average
5212Background (max)Trip
10.8210.90
Avg Min
Comments
Mud
RPM
ECD
(ppg)
ml/30min
Tools
Xceed 675, Periscope 675, Telescope 675
HTHP Fil
Chromatograph (ppm)
1513136' 17336'
WOB
Casing
100% Gas In Air=10,000 Units0Connection
0
3
MD. C/O to 4.5" tools. TOOH w/ 4.5" DP F/8928' T/1775' MD. Tripping Out @ Report Time.Downlink with directional tools. Control drill open hole sidetrack from 16300' MD to 16380' MD @ 30 fph. Currently control drilling.
12828'
Condition
Abandoned
Bit #
2
8.6
8.75
8.85
Smith MDSi616
8.85
Size
Job No.:
Daily Charges:
Total Charges:
MWD Summary
96%
Rig Activity:
11.06
Nabors 245E Report For:
Morning Report Report # 28
Customer:
Well:
Area:
Location:
Rig:
OP09-S1L1
Eni Petroleum
Nikaitchuq Field
Oliktok Point
ROP
ROP (ft/hr)
4.23 @
Mud Data
Depth
25-Jan-2014
12:00 AM
Current Pump & Flow Data:
2509
Max
0
Chlorides
mg/l
37500.00
Pick up BHA #3. Trip in hole from 278' MD to 1514' MD and perform shallow hole test. Trip in hole with 4.5" DP
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
.
.
*
24 hr Recap:
(max)(current)
588
0
Cly
101842
Set AtSize
40.0
Grade
9.63''
907-685-1490Unit Phone:
50
Charles Sinn
Maximum
Report By:Logging Engineers:C. Sinn / J. Failing
36914
433
406
96
Units*
Casing
Summary
Lithology (%)
64
Oil / Water Akal
0.902
0
168
0
Siltst
SPP (psi)
Gallons/stroke
TFABit Type
Depth
2.451
C-5n
17690'
18.0
C-2
905
in
26 17602'Minimum
Depth
Time:
16300' MD to 16394' MD per DD at 15 ROP. Drill from 16394' MD to 17829' MD. Currently drill ahead.
398
There was a max gas while drilling of 905u from 17690' MD.
16384'
17829'
1445'
Max @ ft Current
17934'121.0
Date:
Avg
to16300'
Yesterday's Depth:
Current Depth:
24 Hour Progress:
283.0 Flow In (gpm)
Flow In (spm)
Gas Summary
4
178 97
(current)
Simonson / Sherman
ShClyst TuffGvlCoal
cP
15
4200'
8.75 0.902
Footage
29.31
Ss
Ratio
C-1 C-5i
AK-AM-0901007074
Openhole Sidetrack
PV
24 hr Max
Weight
223
Hours
C-3
05
CementChtSilt
C-4i C-4n
YP
(lb/100ft2)
2.25
186535
120
Smith MDSi616
FazePro 4.017540'20
Depth in / out
Mud Type
Lst
Type
Average
52108Background (max)Trip
10.6710.97
Avg Min
Comments
Mud
RPM
ECD
(ppg)
ml/30min
Tools
Xceed 675, Periscope 675, Telescope 675
HTHP Fil
Chromatograph (ppm)
1513136' 17336'
WOB
Casing
100% Gas In Air=10,000 Units306Connection
225
3
MD. C/O to 4.5" tools. TOOH w/ 4.5" DP F/8928' T/1775' MD. Tripping Out @ Report Time.
12828'
Condition
Abandoned
Bit #
2
8.6
8.75
8.80
Smith MDSi616
8.70
Size
Job No.:
Daily Charges:
Total Charges:
MWD Summary
96%
Rig Activity:
11.15
Nabors 245E Report For:
Morning Report Report # 29
Customer:
Well:
Area:
Location:
Rig:
OP09-S1L1
Eni Petroleum
Nikaitchuq Field
Oliktok Point
ROP
ROP (ft/hr)
4.23 @
Mud Data
Depth
26-Jan-2014
12:00 AM
Current Pump & Flow Data:
2172
Max
84
Chlorides
mg/l
39000.00
Controlled drill from 16300' MD to 16387' MD as per DD at 30 ROP. Pull back to 16300' MD and control drill from
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
.
.
*
24 hr Recap:Drill ahead from 17829' MD to 19488' MD at 400 gpm. Currently drill ahead.
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
Chlorides
mg/l
36500.00
132
27-Jan-2014
12:00 AM
Current Pump & Flow Data:
2170
Max
ROP
ROP (ft/hr)
4.23 @
Mud Data
Depth
Morning Report Report # 30
Customer:
Well:
Area:
Location:
Rig:
OP09-S1L1
Eni Petroleum
Nikaitchuq Field
Oliktok Point
Job No.:
Daily Charges:
Total Charges:
MWD Summary
96%
Rig Activity:
10.98
Nabors 245E Report For:
Condition
Abandoned
Bit #
2
7.7
8.75
8.75
Smith MDSi616
8.70
Size
3
MD. C/O to 4.5" tools. TOOH w/ 4.5" DP F/8928' T/1775' MD. Tripping Out @ Report Time.
12828'
100% Gas In Air=10,000 UnitsN/AConnection
256
Tools
Xceed 675, Periscope 675, Telescope 675
HTHP Fil
Chromatograph (ppm)
1513136' 17336'
WOB
Casing
10.7110.82
Avg Min
Comments
Mud
RPM
ECD
(ppg)
ml/30min
42Background (max)Trip
Average
N/A
Mud Type
Lst
Type
120
Smith MDSi616
FazePro 5.4
16300'
19365'16
Depth in / out
YP
(lb/100ft2)
2.00
4112578
2960
CementChtSilt
C-4i C-4n
24 hr Max
Weight
299
Hours
C-3
Ss
Ratio
C-1 C-5i
AK-AM-0901007074
Drilling Production Lateral
PV
4200'
8.75 0.902
Footage
29.31
Simonson / Sherman
ShClyst TuffGvlCoal
cP
14
Gas Summary
49
206 113
(current)
Avg
to16300'
Yesterday's Depth:
Current Depth:
24 Hour Progress:
234.0 Flow In (gpm)
Flow In (spm)
17829'
19488'
1659'
Max @ ft Current
19392'132.0
Date:
Time:
502
There was a max gas while drilling of 1005u from 17973' MD and an average gas of 502u.
in
48 19376'Minimum
Depth C-5n
17973'
1.5
C-2
1005
SPP (psi)
Gallons/stroke
TFABit Type
Depth
2.447
Oil / Water Akal
0.902
39
193
48
Siltst
406
96
Units*
Casing
Summary
Lithology (%)
11353307
4577
907-685-1490Unit Phone:
58
Charles Sinn
Maximum
Report By:Logging Engineers:C. Sinn / J. Failing
Set AtSize
40.0
Grade
9.63''
(max)(current)
663
46
Cly
110218
.
.
*
24 hr Recap:
(max)(current)
423
68
Cly
93191
Set AtSize
40.0
Grade
9.63''
907-685-1490Unit Phone:
48
Charles Sinn
Maximum
Report By:Logging Engineers:C. Sinn / J. Failing
47835
9041
406
96
Units*
Casing
Summary
Lithology (%)
74
Oil / Water Akal
0.902
35
124
39
Siltst
SPP (psi)
Gallons/stroke
TFABit Type
Depth
73/2746
C-5n
19607'
170.0
C-2
788
in
42 20437'Minimum
Depth
Time:
447
There was a max gas while drilling of 788u from 19607' MD and an average gas of 447u.
19488'
20700'
1212'
Max @ ft Current
20428'123.0
Date:
Avg
to16300'
Yesterday's Depth:
Current Depth:
24 Hour Progress:
232.0 Flow In (gpm)
Flow In (spm)
Gas Summary
37
140 88
(current)
Simonson / Sherman
ShClyst TuffGvlCoal
cP
12
4200'
8.75 0.902
Footage
29.31
Ss
Ratio
C-1 C-5i
AK-AM-0901007074
Drilling Production Lateral
PV
24 hr Max
Weight
225
Hours
C-3
2247
CementChtSilt
C-4i C-4n
YP
(lb/100ft2)
2.00
338759
120
Smith MDSi616
FazePro 5.6
16300'
20565'15
Depth in / out
Mud Type
Lst
Type
Average
N/A40Background (max)Trip
10.6710.78
Avg Min
Comments
Mud
RPM
ECD
(ppg)
ml/30min
Tools
Xceed 675, Periscope 675, Telescope 675
HTHP Fil
Chromatograph (ppm)
1513136' 17336'
WOB
Casing
100% Gas In Air=10,000 UnitsN/AConnection
160
3
MD. C/O to 4.5" tools. TOOH w/ 4.5" DP F/8928' T/1775' MD. Tripping Out @ Report Time.
12828'
Condition
Abandoned
Bit #
2
8.6
8.75
8.75
Smith MDSi616
8.70
Size
Job No.:
Daily Charges:
Total Charges:
MWD Summary
96%
Rig Activity:
11.02
Nabors 245E Report For:
Morning Report Report # 31
Customer:
Well:
Area:
Location:
Rig:
OP09-S1L1
Eni Petroleum
Nikaitchuq Field
Oliktok Point
ROP
ROP (ft/hr)
4.23 @
Mud Data
Depth
28-Jan-2014
12:00 AM
Current Pump & Flow Data:
2170
Max
89
Chlorides
mg/l
37000
Drill from 19488' MD to 20700' MD at 400gpm. Currently drill ahead.
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
.
.
*
24 hr Recap:Drill from 20700' MD to TD at 21465' MD at 400 gpm. Circulate 3 bottoms up while back reaming out of the hole.
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
Chlorides
mg/l
38000
116
29-Jan-2014
12:00 AM
Current Pump & Flow Data:
2362
Max
ROP
ROP (ft/hr)
4.23 @
Mud Data
Depth
Morning Report Report # 32
Customer:
Well:
Area:
Location:
Rig:
OP09-S1L1
Eni Petroleum
Nikaitchuq Field
Oliktok Point
Job No.:
Daily Charges:
Total Charges:
MWD Summary
96%
Rig Activity:
11.02
Nabors 245E Report For:
Condition
Abandoned
Bit #
2
8.6
8.75
8.75
Smith MDSi616
8.75
Size
3
MD. C/O to 4.5" tools. TOOH w/ 4.5" DP F/8928' T/1775' MD. Tripping Out @ Report Time.change out grabber box dies. Back ream out of hole from 20880' MD to 20319' MD. Currently back ream out of hole.
12828'
100% Gas In Air=10,000 UnitsN/AConnection
160
Tools
Xceed 675, Periscope 675, Telescope 675
HTHP Fil
Chromatograph (ppm)
1513136' 17336'
WOB
Casing
10.6610.81
Avg Min
Comments
Mud
RPM
ECD
(ppg)
ml/30min
24Background (max)Trip
Average
N/A
Mud Type
Lst
Type
120
Smith MDSi616
FazePro 5.6
16300'
21465'14
21465'
Depth in / out
YP
(lb/100ft2)
1.75
3710667
2455
CementChtSilt
C-4i C-4n
24 hr Max
Weight
272
Hours
C-3
Ss
Ratio
C-1 C-5i
AK-AM-0901007074
Drilling Production Lateral
PV
4200'
8.75 0.902
Footage
5165'
29.31
Simonson / Sherman
ShClyst TuffGvlCoal
cP
13
Gas Summary
42
138 82
(current)
Avg
to16300'
Yesterday's Depth:
Current Depth:
24 Hour Progress:
232.0 Flow In (gpm)
Flow In (spm)
20700'
21465'
765'
Max @ ft Current
20428'123.0
Date:
Time:
Back ream out of hole 1 stand per bottoms up at 450 gpm. Back ream out of hole from 21465' MD to 20880' MD. Service rig,
469
There was a max gas while drilling of 739u from 20683' MD and an average gas of 469u.
in
42 21241'Minimum
Depth C-5n
20683'
170.0
C-2
739
SPP (psi)
Gallons/stroke
TFABit Type
Depth
73/2746
Oil / Water
21465'
Akal
0.902
40
122
43
Siltst
406
96
Units*
Casing
Summary
Lithology (%)
9253260
7654
907-685-1490Unit Phone:
45
Charles Sinn
Maximum
Report By:Logging Engineers:C. Sinn / J. Failing
Set AtSize
40.0
Grade
9.63''
(max)(current)
418
64
Cly
87638
.
.
*
24 hr Recap:
(max)(current)
Cly
Set AtSize
40.0
Grade
9.63''
907-685-1490Unit Phone:Charles Sinn
Maximum
Report By:Logging Engineers:C. Sinn / J. Failing
465
110
Units*
Casing
Summary
Lithology (%)
Oil / Water
21465'
Akal
0.902
Siltst
SPP (psi)
Gallons/stroke
TFABit Type
Depth
71/2946
C-5n
N/A
C-2
36
in
4Minimum
Depth
Time:
to 12815' MD with no pumps and no rotation. Back ream out of hole from 12815' MD to 11320' MD at 450 gpm. Continue to
21
There was a max gas while tripping of 36 units and an average gas of 21 units.
21465'
21465'
0'
Max @ ft Current
N/AN/A
Date:
Avg
to16300'
Yesterday's Depth:
Current Depth:
24 Hour Progress:
N/A Flow In (gpm)
Flow In (spm)
Gas Summary
(current)
Simonson / Sherman
ShClyst TuffGvlCoal
cP
12
4200'
8.75 0.902
Footage
5165'
29.31
Ss
Ratio
C-1 C-5i
AK-AM-0901007074
Back Ream Out of Hole
PV
24 hr Max
Weight
Hours
C-3
CementChtSilt
C-4i C-4n
YP
(lb/100ft2)
2.00
120
Smith MDSi616
FazePro 5.6
16300'
21465'15
21465'
Depth in / out
Mud Type
Lst
Type
Average
3611Background (max)Trip
9.7210.23
Avg Min
Comments
Mud
RPM
ECD
(ppg)
ml/30min
Tools
Xceed 675, Periscope 675, Telescope 675
HTHP Fil
Chromatograph (ppm)
1513136' 17336'
WOB
Casing
100% Gas In Air=10,000 UnitsN/AConnection
3
MD. C/O to 4.5" tools. TOOH w/ 4.5" DP F/8928' T/1775' MD. Tripping Out @ Report Time.back ream out of hole until all 5" pipe is on surface. Currently back ream out of hole.
12828'
Condition
Abandoned
Bit #
2
7.4
8.75
8.70
Smith MDSi616
8.65
Size
Job No.:
Daily Charges:
Total Charges:
MWD Summary
96%
Rig Activity:
10.62
Nabors 245E Report For:
Morning Report Report # 33
Customer:
Well:
Area:
Location:
Rig:
OP09-S1L1
Eni Petroleum
Nikaitchuq Field
Oliktok Point
ROP
ROP (ft/hr)
4.23 @
Mud Data
Depth
30-Jan-2014
12:00 AM
Current Pump & Flow Data:
1850
Max
Chlorides
mg/l
42000
Back ream out of hole from 20319' MD to 13010' MD at 450 gpm. Trip out of hole through window from 13101' MD
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
.
.
*
24 hr Recap:
(max)(current)
Cly
Set AtSize
40.0
Grade
9.63''
907-685-1490Unit Phone:Charles Sinn
Maximum
Report By:Logging Engineers:C. Sinn / J. Failing
N/A
N/A
Units*
Casing
Summary
Lithology (%)
Oil / Water
21465'
Akal
0.902
Siltst
SPP (psi)
Gallons/stroke
TFABit Type
Depth
73/2746
C-5n
N/A
C-2
in
Minimum
Depth
Time:
up at 450 gpm. Circulate until shakers are clean then slip and cut 118' drill line. Perform rig service. Trip out of hole sideways
No significant gas to report.
21465'
21465'
0'
Max @ ft Current
N/AN/A
Date:
Avg
to16300'
Yesterday's Depth:
Current Depth:
24 Hour Progress:
N/A Flow In (gpm)
Flow In (spm)
Gas Summary
(current)
Simonson / Sherman
ShClyst TuffGvlCoal
cP
12
4200'
8.75 0.902
Footage
5165'
29.31
Ss
Ratio
C-1 C-5i
AK-AM-0901007074
Pick up retrieval BHA
PV
24 hr Max
Weight
Hours
C-3
CementChtSilt
C-4i C-4n
YP
(lb/100ft2)
1.95
120
Smith MDSi616
FazePro 5.8
16300'
21465'15
21465'
Depth in / out
Mud Type
Lst
Type
Average
Background (max)Trip
9.499.59
Avg Min
Comments
Mud
RPM
ECD
(ppg)
ml/30min
Tools
Xceed 675, Periscope 675, Telescope 675
HTHP Fil
Chromatograph (ppm)
1513136' 17336'
WOB
Casing
100% Gas In Air=10,000 UnitsN/AConnection
3
MD. C/O to 4.5" tools. TOOH w/ 4.5" DP F/8928' T/1775' MD. Tripping Out @ Report Time.Lay down 4.5" drill pipe from 9217' MD to 278' MD. Lay down BHA #3. Pick up whipstock retrieval BHA. Currently pick up BHA.
12828'
Condition
Abandoned
Bit #
2
7.5
8.75
8.70
Smith MDSi616
8.70
Size
Job No.:
Daily Charges:
Total Charges:
MWD Summary
96%
Rig Activity:
9.89
Nabors 245E Report For:
Morning Report Report # 34
Customer:
Well:
Area:
Location:
Rig:
OP09-S1L1
Eni Petroleum
Nikaitchuq Field
Oliktok Point
ROP
ROP (ft/hr)
4.23 @
Mud Data
Depth
31-Jan-2014
12:00 AM
Current Pump & Flow Data:
N/A
Max
Chlorides
mg/l
40000
Back ream out of hole from 11320' MD to 9408' MD at 450 gpm. Circulate 3 bottoms up at 1 stand per bottoms
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
.
.
*
24 hr Recap:Pick up Whipstock retrieval BHA. Trip in hole to 1607' MD and shallow hole test. Trip in hole from 1607' MD
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
Chlorides
mg/l
40000
1-Feb-2014
12:00 AM
Current Pump & Flow Data:
N/A
Max
1-1-WT-A-X-I-NO-TD
ROP
ROP (ft/hr)
4.23 @
Mud Data
Depth
Morning Report Report # 35
Customer:
Well:
Area:
Location:
Rig:
OP09-S1L1
Eni Petroleum
Nikaitchuq Field
Oliktok Point
Job No.:
Daily Charges:
Total Charges:
MWD Summary
96%
Rig Activity:
N/A
Nabors 245E Report For:
Condition
Abandoned
Bit #
2
7.5
8.75
8.70
Smith MDSi616
8.70
Size
3
MD. C/O to 4.5" tools. TOOH w/ 4.5" DP F/8928' T/1775' MD. Tripping Out @ Report Time.to 155' MD with whipstock assembly. Lay down whipstock assembly. Rig up to run 5.5" slotted liner. Currently liner rig up.
12828'
100% Gas In Air=10,000 UnitsN/AConnection
Tools
Xceed 675, Periscope 675, Telescope 675
HTHP Fil
Chromatograph (ppm)
14
1513136' 17336'
WOB
Casing
N/AN/A
Avg Min
Comments
Mud
RPM
ECD
(ppg)
ml/30min
Background (max)Trip
Average
Mud Type
Lst
Type
120
120
Smith MDSi616
FazePro 5.8
16300'
21465'15
21465'
Depth in / out
YP
(lb/100ft2)
1.95
CementChtSilt
C-4i C-4n
24 hr Max
Weight
Hours
C-3
Ss
Ratio
C-1 C-5i
AK-AM-0901007074
Rig up liner run
PV
4200'
8.75 0.902
Footage
51.60 5165'
29.31
Simonson / Ruminer
ShClyst TuffGvlCoal
cP
12
Gas Summary
(current)
Avg
to16300'
Yesterday's Depth:
Current Depth:
24 Hour Progress:
N/A Flow In (gpm)
Flow In (spm)
21465'
21465'
0'
Max @ ft Current
N/AN/A
Date:
Time:
to 12810' MD. Circulate and orientate tools. Hook into whipstock and release. Circulate bottoms up. Trip out of hole from 12810' MD
No significant gas to report.
in
Minimum
Depth C-5n
N/A
C-2
SPP (psi)
Gallons/stroke
TFABit Type
Depth
73/2746
Oil / Water
21465'
Akal
0.902
Siltst
N/A
N/A
Units*
Casing
Summary
Lithology (%)
907-685-1490Unit Phone:Charles Sinn
Maximum
Report By:Logging Engineers:C. Sinn / J. Failing
Set AtSize
40.0
Grade
9.63''
(max)(current)
Cly
.
.
*
24 hr Recap:Lay down BHA and clean rig floor. Pick up 5.5" liner tools. RIH with 5.5" liner to 8747' MD. Lay down Volant tools
Density (ppg)
out (sec/qt)
Viscosity BH
Temp (F)
Chlorides
mg/l
40000
2-Feb-2014
12:00 AM
Current Pump & Flow Data:
N/A
Max
1-1-WT-A-X-I-NO-TD
ROP
ROP (ft/hr)
4.23 @
Mud Data
Depth
Morning Report Report # 36
Customer:
Well:
Area:
Location:
Rig:
OP09-S1L1
Eni Petroleum
Nikaitchuq Field
Oliktok Point
Job No.:
Daily Charges:
Total Charges:
MWD Summary
96%
Rig Activity:
N/A
Nabors 245E Report For:
Condition
Abandoned
Bit #
2
111.0
8.75
8.70
Smith MDSi616
8.70
Size
3
MD. C/O to 4.5" tools. TOOH w/ 4.5" DP F/8928' T/1775' MD. Tripping Out @ Report Time.8820' MD. Trip in hole with 5.5" liner on 5" drill pipe from 8820' MD to 10700' MD. Currently running liner.
12828'
100% Gas In Air=10,000 UnitsN/AConnection
Tools
Xceed 675, Periscope 675, Telescope 675
HTHP Fil
Chromatograph (ppm)
14
1513136' 17336'
WOB
Casing
N/AN/A
Avg Min
Comments
RPM
ECD
(ppg)
ml/30min
Background (max)Trip
Average
Mud Type
Lst
Type
120
120
Smith MDSi616
Brine
16300'
21465'
21465'
Depth in / out
YP
(lb/100ft2)
0.00/0.95
CementChtSilt
C-4i C-4n
24 hr Max
Weight
Hours
C-3
Ss
Ratio
C-1 C-5i
AK-AM-0901007074
Running Liner
PV
4200'
8.75 0.902
Footage
51.60 5165'
29.31
Simonson / Ruminer
ShClyst TuffGvlCoal
cP
Gas Summary
(current)
Avg
to16300'
Yesterday's Depth:
Current Depth:
24 Hour Progress:
N/A Flow In (gpm)
Flow In (spm)
21465'
21465'
0'
Max @ ft Current
N/AN/A
Date:
Time:
per GBR. Change out floor tools for Liner Hanger. Makeup hanger assembly. Run in hole to 8820' MD. Perform flow test at
No significant gas to report.
in
Minimum
Depth C-5n
N/A
C-2
SPP (psi)
Gallons/stroke
TFABit Type
Depth
27
Oil / Water
21465'
Pf/Mf
0.902
Siltst
N/A
N/A
Units*
Casing
Summary
Lithology (%)
907-685-1490Unit Phone:Charles Sinn
Maximum
Report By:Logging Engineers:C. Sinn / J. Failing
Set AtSize
40.0
Grade
9.63''
(max)(current)
Cly
.
.
*
24 hr Recap:
(max)(current)
Liner
Cly
Set AtSize
40.0
Grade
9.63''
907-685-1490Unit Phone:Charles Sinn
Maximum
Report By:Logging Engineers:C. Sinn / J. Failing
5.50''
N/A
N/A
Units*
Casing
Summary
Lithology (%)
Oil / Water
21465'
Pf/Mf
0.902
Siltst
SPP (psi)
Gallons/stroke
TFABit Type
Depth
27
C-5n
N/A
C-2
in
Minimum
Depth
Time:
Trip in hole from 12900' MD to 21460' MD. Start rotating string at 18800' MD. Tagged bottom at 21465' MD. Drop ball and
No significant gas to report.
21465'
21465'
0'
Max @ ft Current
N/AN/A
Date:
Avg
to16300'
Yesterday's Depth:
Current Depth:
24 Hour Progress:
N/A Flow In (gpm)
Flow In (spm)
Gas Summary
(current)
Simonson / Sherman
ShClyst TuffGvlCoal
cP
4200'
8.75 0.902
Footage
51.60 5165'
29.31
Ss
Ratio
C-1 C-5i
AK-AM-0901007074
Laying down drillpipe
PV
24 hr Max
28.0
Weight
Hours
C-3
CementChtSilt
C-4i C-4n
YP
(lb/100ft2)
0.00/0.95
120
120
Smith MDSi616
Brine
16300'
21465'
21465'
Depth in / out
Mud Type
Lst
Type
Average
Background (max)Trip
N/AN/A
Avg Min
Comments
No problems running liner
RPM
ECD
(ppg)
ml/30min
Tools
Xceed 675, Periscope 675, Telescope 675
HTHP Fil
Chromatograph (ppm)
14
1513136' 17336'
WOB
Casing
100% Gas In Air=10,000 UnitsN/AConnection
3
5" drill pipe from 12631' MD to 7666' MD. Currently laying down drill pipe.
seat ball at 1848 strokes. Displace wellbore from 8.7 ppg MOBM to 8.7 ppg KCl Brine at 4-7 bpm. Trip out of hole and lay down
21465'
12828'
Condition
Abandoned
Bit #
2
111.0
8.75
8.70
Smith MDSi616
8.70
Size
Job No.:
Daily Charges:
Total Charges:
MWD Summary
96%
Rig Activity:
N/A
Nabors 245E Report For:
Morning Report Report # 37
Customer:
Well:
Area:
Location:
Rig:
OP09-S1L1
Eni Petroleum
Nikaitchuq Field
Oliktok Point
1-1-WT-A-X-I-NO-TD
ROP
ROP (ft/hr)
4.23 @
Mud Data
Depth
3-Feb-2014
12:00 AM
Current Pump & Flow Data:
N/A
Max
Chlorides
mg/l
40000
Trip in hole with 5.5" liner on 5" drill pipe from 10700' MD to 12200' MD. Several attempts to enter window.
Density (ppg)
out (sec/qt)
Viscosity BH
Temp (F)
.
.
*
24 hr Recap:Trip out of hole sideways from 7666' MD to 4644' MD and lay down 5" drill pipe. Service rig. Trip out of hole from
Density (ppg)
out (sec/qt)
Viscosity BH
Temp (F)
Chlorides
mg/l
40000
4-Feb-2014
12:00 AM
Current Pump & Flow Data:
N/A
Max
1-1-WT-A-X-I-NO-TD
ROP
ROP (ft/hr)
4.23 @
Mud Data
Depth
Morning Report Report # 38
Customer:
Well:
Area:
Location:
Rig:
OP09-S1L1
Eni Petroleum
Nikaitchuq Field
Oliktok Point
Job No.:
Daily Charges:
Total Charges:
MWD Summary
96%
Rig Activity:
N/A
Nabors 245E Report For:
Condition
Abandoned
Bit #
2
111.0
8.75
8.70
Smith MDSi616
8.70
Size
3
21465'
12828'
100% Gas In Air=10,000 UnitsConnection
Tools
Xceed 675, Periscope 675, Telescope 675
HTHP Fil
Chromatograph (ppm)
14
1513136' 17336'
WOB
Casing
N/AN/A
Avg Min
Comments
No problems running liner
RPM
ECD
(ppg)
ml/30min
Background (max)Trip
Average
Mud Type
Lst
Type
120
120
Smith MDSi616
Brine
16300'
21465'
21465'
Depth in / out
YP
(lb/100ft2)
0.00/0.95
CementChtSilt
C-4i C-4n
24 hr Max
16.0
Weight
Hours
C-3
Ss
Ratio
C-1 C-5i
AK-AM-0901007074
Rig up for 4.5" tubing
PV
4200'
8.75 0.902
Footage
51.60 5165'
29.31
Simonson / Sherman
ShClyst TuffGvlCoal
cP
Gas Summary
(current)
Avg
to16300'
Yesterday's Depth:
Current Depth:
24 Hour Progress:
N/A Flow In (gpm)
Flow In (spm)
21465'
21465'
0'
Max @ ft Current
N/AN/A
Date:
Time:
4644' MD to surface. Rig up to pull wear bushing. Pull wear bushing. Rig up to run 4.5" tubing and ESP. Currently rigging up.
No significant gas.
in
Minimum
Depth C-5n
N/A
C-2
SPP (psi)
Gallons/stroke
TFABit Type
Depth
27
Oil / Water
21465'
Pf/Mf
0.902
Siltst
5.50''
N/A
N/A
Units*
Casing
Summary
Lithology (%)
907-685-1490Unit Phone:Charles Sinn
Maximum
Report By:Logging Engineers:C. Sinn / J. Failing
Set AtSize
40.0
Grade
9.63''
(max)(current)
Liner
Cly
.
.
*
24 hr Recap:
(max)(current)
Liner
Cly
Set AtSize
40.0
Grade
9.63''
907-685-1490Unit Phone:Charles Sinn
Maximum
Report By:Logging Engineers:C. Sinn / J. Failing
5.50''
N/A
N/A
Units*
Casing
Summary
Lithology (%)
Oil / Water
21465'
Pf/Mf
0.902
Siltst
SPP (psi)
Gallons/stroke
TFABit Type
Depth
27
C-5n
N/A
C-2
8
in
Minimum
Depth
Time:
No significant gas.
21465'
21465'
0'
Max @ ft Current
N/AN/A
Date:
Avg
to16300'
Yesterday's Depth:
Current Depth:
24 Hour Progress:
N/A Flow In (gpm)
Flow In (spm)
Gas Summary
(current)
Simonson / Sherman
ShClyst TuffGvlCoal
cP
4200'
8.75 0.902
Footage
51.60 5165'
29.31
Ss
Ratio
C-1 C-5i
AK-AM-0901007074
Run 4.5" tubing
PV
24 hr Max
16.0
Weight
Hours
C-3
CementChtSilt
C-4i C-4n
YP
(lb/100ft2)
0.00/0.95
120
120
Smith MDSi616
Brine
16300'
21465'
21465'
Depth in / out
Mud Type
Lst
Type
Average
Background (max)Trip
N/AN/A
Avg Min
Comments
No problems running liner
RPM
ECD
(ppg)
ml/30min
Tools
Xceed 675, Periscope 675, Telescope 675
HTHP Fil
Chromatograph (ppm)
14
1513136' 17336'
WOB
Casing
100% Gas In Air=10,000 UnitsConnection
3
21465'
12828'
Condition
Abandoned
Bit #
2
111.0
8.75
8.70
Smith MDSi616
8.70
Size
Job No.:
Daily Charges:
Total Charges:
MWD Summary
96%
Rig Activity:
N/A
Nabors 245E Report For:
Morning Report Report # 39
Customer:
Well:
Area:
Location:
Rig:
OP09-S1L1
Eni Petroleum
Nikaitchuq Field
Oliktok Point
1-1-WT-A-X-I-NO-TD
ROP
ROP (ft/hr)
4.23 @
Mud Data
Depth
5-Feb-2014
12:00 AM
Current Pump & Flow Data:
N/A
Max
Chlorides
mg/l
40000
Run 4.5" tubing.
Density (ppg)
out (sec/qt)
Viscosity BH
Temp (F)
.
.
*
24 hr Recap:Run 4.5" tubing. Rig down volant tool. Pick up and makeup hanger and landing joint. Currently rigging up hanger.
Density (ppg)
out (sec/qt)
Viscosity BH
Temp (F)
Chlorides
mg/l
40000
6-Feb-2014
12:00 AM
Current Pump & Flow Data:
N/A
Max
1-1-WT-A-X-I-NO-TD
ROP
ROP (ft/hr)
4.23 @
Mud Data
Depth
Morning Report Report # 40
Customer:
Well:
Area:
Location:
Rig:
OP09-S1L1
Eni Petroleum
Nikaitchuq Field
Oliktok Point
Job No.:
Daily Charges:
Total Charges:
MWD Summary
96%
Rig Activity:
N/A
Nabors 245E Report For:
Condition
Abandoned
Bit #
2
111.0
8.75
8.70
Smith MDSi616
8.70
Size
3
21465'
12828'
100% Gas In Air=10,000 UnitsConnection
Tools
Xceed 675, Periscope 675, Telescope 675
HTHP Fil
Chromatograph (ppm)
14
1513136' 17336'
WOB
Casing
N/AN/A
Avg Min
Comments
No problems running liner
RPM
ECD
(ppg)
ml/30min
Background (max)Trip
Average
Mud Type
Lst
Type
120
120
Smith MDSi616
Brine
16300'
21465'
21465'
Depth in / out
YP
(lb/100ft2)
0.00/0.95
CementChtSilt
C-4i C-4n
24 hr Max
16.0
Weight
Hours
C-3
Ss
Ratio
C-1 C-5i
AK-AM-0901007074
Run 4.5" tubing
PV
4200'
8.75 0.902
Footage
51.60 5165'
29.31
Simonson / Sherman
ShClyst TuffGvlCoal
cP
Gas Summary
(current)
Avg
to16300'
Yesterday's Depth:
Current Depth:
24 Hour Progress:
N/A Flow In (gpm)
Flow In (spm)
21465'
21465'
0'
Max @ ft Current
N/AN/A
Date:
Time:
No significant gas.
in
Minimum
Depth C-5n
N/A
C-2
SPP (psi)
Gallons/stroke
TFABit Type
Depth
27
Oil / Water
21465'
Pf/Mf
0.902
Siltst
5.50''
N/A
N/A
Units*
Casing
Summary
Lithology (%)
907-685-1490Unit Phone:Charles Sinn
Maximum
Report By:Logging Engineers:C. Sinn / J. Failing
Set AtSize
40.0
Grade
9.63''
(max)(current)
Liner
Cly
WELL INFORMATION Created On : Mar 17 2014
Customer :Eni Petroleum
Well Name :OP09-S1L1
Job Number :AK-XX-0901007074
Rig Name :Nabors 245E
Field Name :Nikaitchuq
Country :USA
Survey Report
Survey dataSURVEY HEADER
Survey data provided by Schlumberger.
DIRECTIONAL SURVEY DATA
Tie-in
0.00 0.00 0.00 0.00 0.00 N 0.00 E
(ft)
Measured Depth DoglegVertical SectionDeparture
(ft)
Latitude
(ft)
Vertical Depth
(deg)
DirectionInclination
(deg)(ft)(ft)(°/100')
41.20 0.05 55.16 41.20 0.01 N 0.01 E 0.01 0.12
166.34 0.19 55.16 166.34 0.16 N 0.23 E 0.16 0.11
201.91 0.08 16.03 201.91 0.22 N 0.29 E 0.22 0.39
262.65 0.07 36.21 262.65 0.29 N 0.32 E 0.29 0.05
322.70 0.04 57.52 322.70 0.33 N 0.36 E 0.33 0.06
382.81 0.31 21.75 382.81 0.49 N 0.44 E 0.49 0.46
473.14 0.85 3.07 473.13 1.39 N 0.56 E 1.39 0.63
535.14 1.57 11.30 535.12 2.68 N 0.75 E 2.68 1.19
628.15 4.04 32.75 628.01 6.69 N 2.78 E 6.69 2.84
725.17 6.80 28.36 724.59 14.62 N 7.35 E 14.62 2.87
820.74 9.92 20.12 819.14 27.33 N 12.88 E 27.33 3.49
916.22 14.09 24.33 912.51 45.65 N 20.50 E 45.65 4.46
1012.30 16.75 20.14 1,005.13 69.31 N 30.08 E 69.31 3.00
1107.61 20.37 14.56 1,095.47 98.27 N 38.99 E 98.27 4.23
1202.20 22.42 10.74 1,183.54 131.93 N 46.49 E 131.93 2.62
1264.76 23.40 10.62 1,241.17 155.86 N 51.00 E 155.86 1.57
1360.41 24.68 10.40 1,328.52 194.17 N 58.11 E 194.17 1.34
1457.59 25.72 10.06 1,416.45 234.89 N 65.45 E 234.89 1.08
1552.92 25.24 8.81 1,502.51 275.35 N 72.18 E 275.35 0.76
1649.17 24.62 7.89 1,589.79 315.48 N 78.07 E 315.48 0.76
1745.37 25.80 8.18 1,676.82 356.06 N 83.80 E 356.06 1.23
1841.25 26.95 8.29 1,762.72 398.21 N 89.90 E 398.21 1.20
1936.26 30.70 7.23 1,845.95 443.59 N 96.06 E 443.59 3.98
2032.39 32.32 6.85 1,927.90 493.45 N 102.22 E 493.45 1.70
2127.04 36.62 7.19 2,005.91 546.61 N 108.77 E 546.61 4.55
2223.33 38.94 5.90 2,082.01 605.21 N 115.48 E 605.21 2.55
2256.53 40.18 4.98 2,107.61 626.26 N 117.48 E 626.26 4.13
2325.00 42.25 4.24 2,159.11 671.22 N 121.10 E 671.22 3.11
2418.35 45.09 3.31 2,226.63 735.53 N 125.33 E 735.53 3.12
2513.83 50.08 2.18 2,291.01 805.92 N 128.68 E 805.92 5.30
2609.63 54.07 1.56 2,349.88 881.43 N 131.13 E 881.43 4.20
INSITE V8.0.20 Page 1Job No:AK-XX-0901007074 Well Name:OP09-S1L1 Survey Report
DIRECTIONAL SURVEY DATA
(ft)
Measured Depth DoglegVertical SectionDeparture
(ft)
Latitude
(ft)
Vertical Depth
(deg)
DirectionInclination
(deg)(ft)(ft)(°/100')
2706.46 57.93 2.02 2,404.02 961.65 N 133.64 E 961.65 4.01
2802.28 61.19 2.94 2,452.56 1,044.18 N 137.23 E 1044.18 3.50
2896.67 63.45 3.58 2,496.40 1,127.62 N 141.99 E 1127.62 2.47
2991.73 66.11 4.07 2,536.90 1,213.42 N 147.73 E 1213.42 2.84
3086.63 68.56 3.95 2,573.47 1,300.77 N 153.85 E 1300.77 2.58
3182.73 71.99 4.10 2,605.90 1,391.00 N 160.20 E 1391.00 3.57
3279.58 75.39 4.42 2,633.09 1,483.68 N 167.11 E 1483.68 3.52
3374.07 79.72 5.04 2,653.45 1,575.61 N 174.72 E 1575.61 4.63
3470.62 82.62 5.03 2,668.27 1,670.64 N 183.09 E 1670.64 3.00
3566.99 82.45 4.78 2,680.79 1,765.84 N 191.26 E 1765.84 0.31
3661.91 82.40 4.43 2,693.30 1,859.63 N 198.81 E 1859.63 0.37
3757.93 82.28 4.02 2,706.10 1,954.53 N 205.82 E 1954.53 0.44
3854.52 82.25 4.27 2,719.10 2,049.99 N 212.74 E 2049.99 0.26
3949.90 82.31 3.75 2,731.92 2,144.28 N 219.35 E 2144.28 0.54
4045.60 82.28 3.99 2,744.75 2,238.90 N 225.75 E 2238.90 0.25
4140.72 82.28 3.73 2,757.52 2,332.94 N 232.10 E 2332.94 0.27
4236.48 82.16 3.76 2,770.49 2,427.62 N 238.30 E 2427.62 0.13
4332.37 82.26 3.89 2,783.48 2,522.41 N 244.63 E 2522.41 0.17
4430.11 82.23 4.02 2,796.67 2,619.03 N 251.31 E 2619.03 0.14
4525.98 82.16 3.78 2,809.69 2,713.79 N 257.77 E 2713.79 0.26
4619.72 82.25 3.62 2,822.41 2,806.47 N 263.77 E 2806.47 0.19
4716.11 82.34 3.17 2,835.33 2,901.82 N 269.42 E 2901.82 0.47
4811.13 82.35 2.94 2,847.99 2,995.86 N 274.44 E 2995.86 0.24
4905.89 82.96 2.93 2,860.10 3,089.72 N 279.25 E 3089.72 0.64
5002.57 83.18 3.27 2,871.77 3,185.55 N 284.44 E 3185.55 0.42
5097.91 83.14 4.23 2,883.12 3,280.01 N 290.64 E 3280.01 1.00
5193.88 83.26 4.85 2,894.49 3,375.00 N 298.18 E 3375.00 0.65
5289.26 83.26 4.56 2,905.68 3,469.41 N 305.95 E 3469.41 0.30
5385.37 83.23 4.72 2,916.98 3,564.54 N 313.67 E 3564.54 0.17
5480.74 83.27 4.76 2,928.19 3,658.92 N 321.49 E 3658.92 0.06
5575.98 83.17 4.75 2,939.44 3,753.17 N 329.33 E 3753.17 0.11
5671.77 83.33 4.43 2,950.70 3,847.99 N 336.95 E 3847.99 0.37
5767.48 82.88 3.87 2,962.19 3,942.76 N 343.82 E 3942.76 0.75
5864.24 82.46 2.81 2,974.53 4,038.56 N 349.42 E 4038.56 1.17
5959.02 81.74 0.98 2,987.56 4,132.39 N 352.52 E 4132.39 2.06
6052.73 81.73 357.80 3,001.03 4,225.11 N 351.53 E 4225.11 3.36
6149.73 81.77 356.06 3,014.95 4,320.96 N 346.39 E 4320.96 1.78
6246.02 81.67 356.06 3,028.82 4,416.02 N 339.84 E 4416.02 0.10
6342.76 81.76 355.89 3,042.76 4,511.52 N 333.13 E 4511.52 0.20
6436.85 81.89 356.24 3,056.14 4,604.43 N 326.73 E 4604.43 0.39
6531.52 81.64 356.94 3,069.70 4,697.96 N 321.16 E 4697.96 0.78
6627.41 81.71 358.24 3,083.58 4,792.75 N 317.17 E 4792.75 1.34
6723.34 81.68 358.89 3,097.44 4,887.64 N 314.79 E 4887.64 0.67
6817.96 81.73 359.02 3,111.09 4,981.26 N 313.09 E 4981.26 0.15
6911.64 81.77 358.98 3,124.53 5,073.96 N 311.47 E 5073.96 0.06
INSITE V8.0.20 Page 2Job No:AK-XX-0901007074 Well Name:OP09-S1L1 Survey Report
DIRECTIONAL SURVEY DATA
(ft)
Measured Depth DoglegVertical SectionDeparture
(ft)
Latitude
(ft)
Vertical Depth
(deg)
DirectionInclination
(deg)(ft)(ft)(°/100')
7008.05 81.48 358.05 3,138.58 5,169.30 N 309.00 E 5169.30 1.00
7097.50 81.77 358.06 3,151.61 5,257.75 N 305.99 E 5257.75 0.32
7189.68 81.84 358.16 3,164.75 5,348.94 N 302.98 E 5348.94 0.13
7297.48 82.23 359.61 3,179.68 5,455.67 N 300.91 E 5455.68 1.38
7392.81 82.38 1.45 3,192.45 5,550.14 N 301.78 E 5550.14 1.92
7487.88 82.19 2.59 3,205.21 5,644.29 N 305.10 E 5644.29 1.20
7583.97 82.08 1.90 3,218.36 5,739.40 N 308.83 E 5739.40 0.72
7680.51 82.14 2.31 3,231.61 5,834.96 N 312.34 E 5834.96 0.43
7774.84 82.29 0.86 3,244.39 5,928.38 N 314.93 E 5928.38 1.53
7871.73 82.16 1.87 3,257.50 6,024.35 N 317.21 E 6024.35 1.04
7967.94 82.17 2.73 3,270.62 6,119.59 N 321.04 E 6119.59 0.89
8063.47 82.19 2.47 3,283.61 6,214.13 N 325.33 E 6214.13 0.27
8159.30 82.25 2.40 3,296.59 6,308.99 N 329.37 E 6308.99 0.10
8254.78 82.32 2.39 3,309.40 6,403.53 N 333.32 E 6403.53 0.07
8351.17 82.22 2.59 3,322.37 6,498.95 N 337.47 E 6498.95 0.23
8447.02 82.11 2.23 3,335.44 6,593.82 N 341.46 E 6593.82 0.39
8542.51 82.14 1.74 3,348.52 6,688.35 N 344.74 E 6688.35 0.51
8638.55 82.17 0.87 3,361.63 6,783.47 N 346.91 E 6783.47 0.90
8733.97 82.23 359.73 3,374.58 6,878.00 N 347.40 E 6878.00 1.19
8829.77 82.12 358.47 3,387.62 6,972.90 N 345.91 E 6972.90 1.31
8921.65 82.53 358.51 3,399.89 7,063.92 N 343.51 E 7063.92 0.45
9020.39 82.25 358.19 3,412.97 7,161.75 N 340.69 E 7161.75 0.43
9109.82 82.97 357.06 3,424.47 7,250.36 N 337.02 E 7250.36 1.49
9140.07 84.98 357.23 3,427.65 7,280.41 N 335.52 E 7280.41 6.67
9173.95 83.74 357.26 3,430.98 7,314.08 N 333.90 E 7314.08 3.66
9236.04 83.16 357.97 3,438.06 7,375.71 N 331.33 E 7375.71 1.47
9332.21 82.36 359.41 3,450.18 7,471.09 N 329.15 E 7471.09 1.70
9427.71 81.24 359.74 3,463.80 7,565.61 N 328.45 E 7565.61 1.22
9525.61 82.24 0.93 3,477.87 7,662.49 N 329.01 E 7662.49 1.58
9618.60 82.46 0.96 3,490.24 7,754.64 N 330.53 E 7754.64 0.24
9714.01 81.94 0.87 3,503.19 7,849.15 N 332.04 E 7849.15 0.55
9809.58 82.03 0.65 3,516.52 7,943.78 N 333.30 E 7943.78 0.25
9905.46 81.29 1.00 3,530.43 8,038.64 N 334.66 E 8038.64 0.85
10001.03 81.77 0.49 3,544.50 8,133.15 N 335.89 E 8133.15 0.73
10096.27 81.53 0.13 3,558.33 8,227.38 N 336.40 E 8227.38 0.45
10191.81 84.75 0.53 3,569.74 8,322.22 N 336.95 E 8322.23 3.40
10289.14 84.39 0.41 3,578.95 8,419.11 N 337.75 E 8419.11 0.39
10340.69 83.09 358.92 3,584.58 8,470.35 N 337.45 E 8470.35 3.82
10385.58 81.84 357.98 3,590.46 8,514.84 N 336.24 E 8514.84 3.47
10481.36 82.51 357.71 3,603.50 8,609.66 N 332.68 E 8609.66 0.75
10576.61 81.47 355.39 3,616.78 8,703.80 N 327.00 E 8703.80 2.65
10672.88 81.34 353.63 3,631.17 8,798.55 N 317.90 E 8798.55 1.81
10768.95 81.35 351.64 3,645.62 8,892.74 N 305.72 E 8892.74 2.05
10863.81 81.27 349.14 3,659.96 8,985.18 N 290.07 E 8985.18 2.61
10958.35 81.94 347.23 3,673.76 9,076.72 N 270.92 E 9076.73 2.12
INSITE V8.0.20 Page 3Job No:AK-XX-0901007074 Well Name:OP09-S1L1 Survey Report
DIRECTIONAL SURVEY DATA
(ft)
Measured Depth DoglegVertical SectionDeparture
(ft)
Latitude
(ft)
Vertical Depth
(deg)
DirectionInclination
(deg)(ft)(ft)(°/100')
11055.34 82.03 344.92 3,687.29 9,169.94 N 247.81 E 9169.94 2.36
11150.38 82.90 343.51 3,699.75 9,260.60 N 222.18 E 9260.60 1.73
11245.43 83.08 341.86 3,711.35 9,350.66 N 194.10 E 9350.66 1.73
11339.05 83.22 340.34 3,722.52 9,438.60 N 163.99 E 9438.60 1.62
11433.54 83.37 336.19 3,733.56 9,525.75 N 129.25 E 9525.75 4.36
11530.10 83.40 336.48 3,744.68 9,613.60 N 90.75 E 9613.60 0.30
11625.51 81.59 334.50 3,757.14 9,699.66 N 51.51 E 9699.66 2.80
11721.32 82.92 333.67 3,770.05 9,785.05 N 10.02 E 9785.05 1.63
11817.56 83.65 331.94 3,781.31 9,870.06 N 33.66 W 9870.06 1.94
11913.70 83.51 328.51 3,792.06 9,952.97 N 81.10 W 9952.97 3.55
12009.64 83.25 326.77 3,803.12 10,033.47 N 132.10 W 10033.47 1.82
12104.34 82.89 323.76 3,814.55 10,110.72 N 185.66 W 10110.72 3.18
12199.73 84.14 321.01 3,825.33 10,185.78 N 243.50 W 10185.78 3.15
12296.02 84.56 317.98 3,834.81 10,258.63 N 305.73 W 10258.63 3.16
12391.16 84.14 314.81 3,844.18 10,327.18 N 371.02 W 10327.18 3.35
12487.61 83.75 310.82 3,854.35 10,392.35 N 441.36 W 10392.35 4.13
12583.13 84.15 309.45 3,864.42 10,453.58 N 513.98 W 10453.58 1.49
12679.11 84.19 308.96 3,874.17 10,513.93 N 587.97 W 10513.93 0.51
12774.86 83.34 309.59 3,884.57 10,574.19 N 661.65 W 10574.19 1.10
12827.00 83.48 309.49 3,890.56 10,607.16 N 701.60 W 10607.16 0.33
12877.11 85.11 311.70 3,895.54 10,639.61 N 739.45 W 10639.61 5.46
12972.65 87.92 316.20 3,901.35 10,705.77 N 808.08 W 10705.77 5.55
13073.02 87.02 321.65 3,905.78 10,781.33 N 873.94 W 10781.33 5.50
13153.52 88.40 322.63 3,909.00 10,844.83 N 923.31 W 10844.83 2.10
13249.11 87.53 322.65 3,912.39 10,920.76 N 981.27 W 10920.76 0.91
13344.90 89.14 320.63 3,915.18 10,995.84 N 1,040.69 W 10995.84 2.70
13440.62 89.98 321.74 3,915.91 11,070.41 N 1,100.69 W 11070.42 1.45
13536.40 89.61 320.90 3,916.25 11,145.18 N 1,160.55 W 11145.18 0.96
13632.36 89.30 319.97 3,917.17 11,219.16 N 1,221.66 W 11219.16 1.02
13728.07 89.01 318.61 3,918.58 11,291.70 N 1,284.08 W 11291.70 1.45
13823.88 88.60 317.87 3,920.58 11,363.15 N 1,347.88 W 11363.15 0.88
13919.67 88.82 313.99 3,922.73 11,431.94 N 1,414.47 W 11431.94 4.06
14015.32 89.77 312.97 3,923.91 11,497.75 N 1,483.87 W 11497.75 1.46
14111.23 90.92 311.10 3,923.33 11,561.97 N 1,555.10 W 11561.97 2.29
14206.68 90.69 308.73 3,921.99 11,623.20 N 1,628.30 W 11623.20 2.49
14302.75 89.29 306.77 3,922.01 11,682.01 N 1,704.26 W 11682.01 2.51
14398.54 88.24 303.23 3,924.07 11,736.93 N 1,782.69 W 11736.93 3.85
14494.35 90.02 301.29 3,925.53 11,788.06 N 1,863.69 W 11788.06 2.75
14589.31 91.08 298.96 3,924.62 11,835.72 N 1,945.82 W 11835.72 2.70
14685.00 89.77 298.17 3,923.91 11,881.47 N 2,029.85 W 11881.47 1.60
14780.74 87.67 297.23 3,926.05 11,925.96 N 2,114.60 W 11925.96 2.40
14876.64 91.37 300.07 3,926.85 11,971.92 N 2,198.73 W 11971.92 4.86
14972.38 89.26 302.05 3,926.32 12,021.31 N 2,280.73 W 12021.31 3.02
15068.16 89.06 300.77 3,927.73 12,071.22 N 2,362.46 W 12071.22 1.35
15164.02 89.28 299.52 3,929.12 12,119.36 N 2,445.35 W 12119.36 1.32
INSITE V8.0.20 Page 4Job No:AK-XX-0901007074 Well Name:OP09-S1L1 Survey Report
DIRECTIONAL SURVEY DATA
(ft)
Measured Depth DoglegVertical SectionDeparture
(ft)
Latitude
(ft)
Vertical Depth
(deg)
DirectionInclination
(deg)(ft)(ft)(°/100')
15259.93 88.87 299.06 3,930.66 12,166.27 N 2,528.99 W 12166.27 0.64
15354.76 89.87 297.93 3,931.71 12,211.51 N 2,612.32 W 12211.51 1.59
15450.35 90.70 298.01 3,931.23 12,256.34 N 2,696.74 W 12256.34 0.87
15546.13 92.80 298.09 3,928.31 12,301.36 N 2,781.23 W 12301.36 2.19
15641.86 92.85 299.35 3,923.59 12,347.30 N 2,865.08 W 12347.30 1.32
15737.12 90.96 300.04 3,920.42 12,394.47 N 2,947.78 W 12394.46 2.11
15832.92 90.50 301.98 3,919.20 12,443.81 N 3,029.88 W 12443.81 2.08
15928.69 89.78 303.65 3,918.97 12,495.71 N 3,110.36 W 12495.71 1.90
16024.54 89.37 303.77 3,919.68 12,548.91 N 3,190.09 W 12548.91 0.45
16120.39 89.50 303.43 3,920.62 12,601.95 N 3,269.92 W 12601.95 0.38
16216.18 89.42 302.26 3,921.53 12,653.90 N 3,350.39 W 12653.90 1.22
16300.00 90.00 302.37 3,921.95 12,698.70 N 3,421.23 W 12698.70 0.70
16324.22 89.33 303.25 3,922.09 12,711.83 N 3,441.59 W 12711.83 4.57
16420.34 88.68 305.53 3,923.76 12,766.10 N 3,520.89 W 12766.10 2.47
16515.95 88.34 307.30 3,926.25 12,822.84 N 3,597.80 W 12822.84 1.88
16611.38 88.39 308.33 3,928.97 12,881.32 N 3,673.16 W 12881.33 1.08
16707.16 87.44 307.72 3,932.45 12,940.29 N 3,748.56 W 12940.29 1.18
16803.08 88.90 305.72 3,935.52 12,997.60 N 3,825.40 W 12997.60 2.58
16898.85 88.47 301.50 3,937.72 13,050.59 N 3,905.12 W 13050.59 4.43
16994.61 87.71 302.00 3,940.91 13,100.95 N 3,986.50 W 13100.95 0.95
17090.29 88.72 298.17 3,943.89 13,148.88 N 4,069.24 W 13148.88 4.14
17186.28 89.84 298.12 3,945.10 13,194.15 N 4,153.87 W 13194.15 1.17
17281.74 91.94 297.25 3,943.61 13,238.50 N 4,238.38 W 13238.50 2.38
17377.96 91.46 295.88 3,940.76 13,281.51 N 4,324.41 W 13281.51 1.51
17473.28 89.59 293.78 3,939.89 13,321.53 N 4,410.90 W 13321.53 2.95
17569.09 90.88 294.77 3,939.49 13,360.92 N 4,498.24 W 13360.92 1.70
17664.91 90.95 296.41 3,937.96 13,402.30 N 4,584.64 W 13402.30 1.71
17760.92 90.74 297.55 3,936.55 13,445.85 N 4,670.19 W 13445.85 1.21
17856.58 91.92 298.44 3,934.33 13,490.74 N 4,754.64 W 13490.74 1.54
17952.23 92.84 297.77 3,930.35 13,535.76 N 4,838.93 W 13535.76 1.19
18047.98 93.45 299.29 3,925.10 13,581.42 N 4,922.93 W 13581.42 1.71
18143.82 91.73 299.49 3,920.77 13,628.40 N 5,006.34 W 13628.40 1.81
18239.29 91.99 299.51 3,917.67 13,675.39 N 5,089.39 W 13675.39 0.27
18334.43 91.48 298.84 3,914.79 13,721.75 N 5,172.42 W 13721.75 0.88
18430.07 91.45 299.82 3,912.35 13,768.58 N 5,255.78 W 13768.58 1.02
18525.82 90.35 299.55 3,910.84 13,815.99 N 5,338.95 W 13815.99 1.18
18621.46 90.31 299.05 3,910.29 13,862.80 N 5,422.35 W 13862.79 0.52
18717.18 90.35 299.37 3,909.74 13,909.51 N 5,505.90 W 13909.51 0.34
18812.77 91.50 300.39 3,908.20 13,957.12 N 5,588.77 W 13957.12 1.61
18908.73 91.98 302.01 3,905.28 14,006.81 N 5,670.81 W 14006.81 1.76
19004.53 89.60 302.42 3,903.96 14,057.87 N 5,751.85 W 14057.87 2.52
19100.37 89.74 302.05 3,904.51 14,108.99 N 5,832.91 W 14108.99 0.41
19196.06 91.35 302.34 3,903.60 14,159.97 N 5,913.88 W 14159.97 1.71
19291.81 91.57 302.59 3,901.16 14,211.35 N 5,994.64 W 14211.35 0.35
19387.48 88.14 302.21 3,901.41 14,262.60 N 6,075.41 W 14262.60 3.61
INSITE V8.0.20 Page 5Job No:AK-XX-0901007074 Well Name:OP09-S1L1 Survey Report
DIRECTIONAL SURVEY DATA
(ft)
Measured Depth DoglegVertical SectionDeparture
(ft)
Latitude
(ft)
Vertical Depth
(deg)
DirectionInclination
(deg)(ft)(ft)(°/100')
19483.26 90.63 301.01 3,902.43 14,312.80 N 6,156.96 W 14312.79 2.89
19579.02 89.21 302.29 3,902.57 14,363.04 N 6,238.48 W 14363.04 2.00
19674.63 90.02 301.48 3,903.21 14,413.54 N 6,319.66 W 14413.54 1.20
19770.33 91.32 299.67 3,902.09 14,462.21 N 6,402.04 W 14462.21 2.33
19866.38 92.29 299.03 3,899.07 14,509.27 N 6,485.72 W 14509.27 1.21
19962.05 91.94 296.62 3,895.53 14,553.89 N 6,570.26 W 14553.89 2.54
20057.15 92.27 299.03 3,892.04 14,598.25 N 6,654.31 W 14598.25 2.56
20153.00 92.27 300.09 3,888.24 14,645.50 N 6,737.61 W 14645.50 1.11
20248.42 91.83 301.87 3,884.83 14,694.58 N 6,819.37 W 14694.58 1.92
20344.04 92.59 303.76 3,881.14 14,746.36 N 6,899.66 W 14746.36 2.13
20439.84 92.58 305.21 3,876.82 14,800.54 N 6,978.55 W 14800.54 1.51
20535.45 92.40 304.06 3,872.67 14,854.83 N 7,057.14 W 14854.83 1.22
20631.23 92.43 304.75 3,868.63 14,908.90 N 7,136.09 W 14908.90 0.72
20727.08 90.93 304.90 3,865.82 14,963.61 N 7,214.74 W 14963.61 1.57
20822.93 90.27 303.25 3,864.82 15,017.31 N 7,294.12 W 15017.31 1.85
20918.00 90.31 302.54 3,864.34 15,068.94 N 7,373.95 W 15068.94 0.75
21013.78 90.67 301.65 3,863.52 15,119.83 N 7,455.09 W 15119.83 1.00
21109.64 90.47 300.53 3,862.57 15,169.32 N 7,537.17 W 15169.32 1.19
21204.93 90.87 299.61 3,861.45 15,217.07 N 7,619.63 W 15217.07 1.05
21300.62 89.18 298.52 3,861.41 15,263.55 N 7,703.27 W 15263.55 2.10
21399.84 91.33 298.53 3,860.97 15,310.93 N 7,790.44 W 15310.93 2.17
21465.00 91.33 298.53 3,859.46 15,342.04 N 7,847.67 W 15342.04 0.00
DIRECTIONAL SURVEY DATA NOTES
- Calculation based on minimum curvature method.
- Survey coordinates relative to well system reference point.
- TVD values given relative to drilling measurement point.
- Vertical section relative to well head.
- Vertical section is computed along a direction of 0.00 degrees (Grid)
- A total correction of 0.00 deg from Magnetic north to Grid north has been applied
- Horizontal displacement is relative to the well head.
- Horizontal displacement (closure) at 21,465.00 feet is 17,232.65 feet along 332.91 degrees (Grid)
INSITE V8.0.20 Page 6Job No:AK-XX-0901007074 Well Name:OP09-S1L1 Survey Report
WARRANTY
HALLIBURTON ENERGY SERVICES, INC. WILL USE ITS BEST EFFORTS TO FURNISH CUSTOMERS WITH ACCURATE INFORMATION
AND INTERPRETATIONS THAT ARE PART OF, AND INCIDENT TO, THE SERVICES PROVIDED. HOWEVER, HALLIBURTON ENERGY
SERVICES, INC. CANNOT AND DOES NOT WARRANT THE ACCURACY OR CORRECTNESS OF SUCH INFORMATION AND
INTERPRETATIONS. UNDER NO CIRCUMSTANCES SHOULD ANY SUCH INFORMATION OR INTERPRETATION BE RELIED UPON AS
THE SOLE BASIS FOR ANY DRILLING, COMPLETION, PRODUCTION, OR FINANCIAL DECISION OR ANY PROCEDURE INVOLVING ANY
RISK TO THE SAFETY OF ANY DRILLING VENTURE, DRILLING RIG OR ITS CREW OR ANY THIRD PARTY. THE CUSTOMER HAS FULL
RESPONSIBILITY FOR ALL DRILLING, COMPLETION, AND PRODUCTION OPERATION. HALLIBURTON ENERGY SERVICES, INC.
MAKES NO REPRESENTATIONS OR WARRANTIES, EITHER EXPRESSED OR IMPLIED, INCLUDING, BUT NOT LIMITED TO, THE
IMPLIED WARRANTIES OF MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE, WITH RESPECT TO THE SERVICES
RENDERED. IN NO EVENT WILL HALLIBURTON ENERGY SERVICES, INC. SERVICES BE LIABLE FOR FAILURE TO OBTAIN ANY
PARTICULAR RESULTS OR FOR ANY DAMAGES, INCLUDING, BUT NOT LIMITED TO, INDIRECT, SPECIAL OR CONSEQUENTIAL
DAMAGES, RESULTING FROM THE USE OF ANY INFORMATION OR INTERPRETATION PROVIDED BY HALLIBURTON ENERGY
SERVICES, INC.
INSITE V8.0.20 Page 7Job No:AK-XX-0901007074 Well Name:OP09-S1L1 Survey Report
WELL INFORMATION Created On : Mar 17 2014
Customer :Eni Petroleum
Well Name :OP09-S1L1 PB1
Job Number :AK-XX-0901007074
Rig Name :Nabors 245E
Field Name :Nikaitchuq
Country :USA
Survey Report
Survey dataSURVEY HEADER
Survey data provided by Schlumberger.
DIRECTIONAL SURVEY DATA
Tie-in
12009.00 83.25 326.77 3803.11 0.00 N 0.00 E
(ft)
Measured Depth DoglegVertical SectionDeparture
(ft)
Latitude
(ft)
Vertical Depth
(deg)
DirectionInclination
(deg)(ft)(ft)(°/100')
12009.64 83.25 326.77 3,803.19 0.53 N 0.35 W 0.53 3.16
12104.34 82.89 323.76 3,814.62 77.77 N 53.92 W 77.77 3.16
12104.34 82.89 323.76 3,814.62 77.77 N 53.92 W 77.77 3.16
12104.34 82.89 323.76 3,814.62 77.77 N 53.92 W 77.77 3.16
12199.73 84.14 321.01 3,825.39 152.84 N 111.76 W 152.84 3.15
12199.73 84.14 321.01 3,825.39 152.84 N 111.76 W 152.84 3.15
12199.73 84.14 321.01 3,825.39 152.84 N 111.76 W 152.84 3.15
12296.02 84.56 317.98 3,834.87 225.68 N 173.99 W 225.68 3.16
12296.02 84.56 317.98 3,834.87 225.68 N 173.99 W 225.68 3.16
12296.02 84.56 317.98 3,834.87 225.68 N 173.99 W 225.68 3.16
12391.16 84.14 314.81 3,844.24 294.23 N 239.28 W 294.23 3.34
12391.16 84.14 314.81 3,844.24 294.23 N 239.28 W 294.23 3.34
12391.16 84.14 314.81 3,844.24 294.23 N 239.28 W 294.23 3.34
12487.61 83.75 310.82 3,854.42 359.41 N 309.62 W 359.41 4.13
12487.61 83.75 310.82 3,854.42 359.41 N 309.62 W 359.41 4.13
12487.61 83.75 310.82 3,854.42 359.41 N 309.62 W 359.41 4.13
12583.13 84.15 309.45 3,864.49 420.63 N 382.24 W 420.63 1.49
12583.13 84.15 309.45 3,864.49 420.63 N 382.24 W 420.63 1.49
12583.13 84.15 309.45 3,864.49 420.63 N 382.24 W 420.63 1.49
12679.11 84.19 308.96 3,874.24 480.99 N 456.23 W 480.99 0.51
12679.11 84.19 308.96 3,874.24 480.99 N 456.23 W 480.99 0.51
12679.11 84.19 308.96 3,874.24 480.99 N 456.23 W 480.99 0.51
12774.86 83.34 309.59 3,884.64 541.24 N 529.91 W 541.24 1.10
12774.86 83.34 309.59 3,884.64 541.24 N 529.91 W 541.24 1.10
12774.86 83.34 309.59 3,884.64 541.24 N 529.91 W 541.24 1.10
12827.00 83.48 309.49 3,890.62 574.21 N 569.86 W 574.21 0.33
12827.00 83.48 309.49 3,890.62 574.21 N 569.86 W 574.21 0.33
12877.11 85.11 311.40 3,895.60 606.56 N 607.80 W 606.56 5.00
12877.11 85.11 311.70 3,895.60 606.56 N 607.80 W 606.56 5.00
12877.11 85.11 311.70 3,895.60 606.56 N 607.80 W 606.56 5.00
12877.11 85.11 311.70 3,895.60 606.56 N 607.80 W 606.56 5.00
INSITE V8.0.20 Page 1Job No:AK-XX-0901007074 Well Name:OP09-S1L1 PB1 Survey Report
DIRECTIONAL SURVEY DATA
(ft)
Measured Depth DoglegVertical SectionDeparture
(ft)
Latitude
(ft)
Vertical Depth
(deg)
DirectionInclination
(deg)(ft)(ft)(°/100')
12972.65 87.92 315.20 3,901.41 671.95 N 677.18 W 671.95 4.94
12972.65 87.92 316.20 3,901.41 671.95 N 677.18 W 671.95 4.94
12972.65 87.92 316.20 3,901.41 671.95 N 677.18 W 671.95 4.94
12972.65 87.92 316.20 3,901.41 671.95 N 677.18 W 671.95 4.94
13068.01 87.01 320.56 3,905.63 742.58 N 741.05 W 742.58 5.70
13073.02 87.06 322.44 3,905.89 746.50 N 744.17 W 746.50 37.49
13073.02 87.06 322.44 3,905.89 746.50 N 744.17 W 746.50 37.49
13073.02 87.06 322.44 3,905.89 746.50 N 744.17 W 746.50 37.49
13153.52 88.35 323.30 3,909.12 810.62 N 792.72 W 810.62 1.93
13153.52 88.35 323.30 3,909.12 810.62 N 792.72 W 810.62 1.93
13153.52 88.35 323.30 3,909.12 810.62 N 792.72 W 810.62 1.93
13249.11 87.59 322.59 3,912.50 886.86 N 850.28 W 886.86 1.09
13249.11 87.59 322.59 3,912.50 886.86 N 850.28 W 886.86 1.09
13249.11 87.59 322.59 3,912.50 886.86 N 850.28 W 886.86 1.09
13344.90 89.13 320.57 3,915.24 961.87 N 909.78 W 961.87 2.65
13440.62 89.96 322.44 3,916.00 1,036.78 N 969.35 W 1036.78 2.14
13536.40 89.85 322.30 3,916.16 1,112.64 N 1,027.83 W 1112.64 0.19
13536.40 89.62 321.08 3,916.16 1,112.64 N 1,027.83 W 1112.64 0.19
13632.36 89.30 320.75 3,916.87 1,187.76 N 1,087.53 W 1187.76 1.71
13728.07 89.02 319.28 3,918.28 1,261.08 N 1,149.03 W 1261.08 1.56
13823.88 88.62 318.69 3,920.25 1,333.36 N 1,211.89 W 1333.36 0.74
13919.67 88.84 313.96 3,922.38 1,402.60 N 1,278.00 W 1402.60 4.94
14015.32 89.78 313.44 3,923.53 1,468.68 N 1,347.15 W 1468.68 1.12
14111.23 90.89 311.39 3,922.97 1,533.37 N 1,417.95 W 1533.37 2.43
14206.68 90.66 308.76 3,921.67 1,594.80 N 1,490.98 W 1594.81 2.77
14302.75 89.30 307.22 3,921.71 1,653.94 N 1,566.69 W 1653.94 2.14
14398.54 88.30 303.46 3,923.72 1,709.32 N 1,644.79 W 1709.32 4.06
14494.35 90.02 301.61 3,925.12 1,760.84 N 1,725.55 W 1760.84 2.64
14589.31 91.05 299.32 3,924.23 1,808.98 N 1,807.39 W 1808.98 2.64
14685.00 89.76 298.48 3,923.56 1,855.22 N 1,891.16 W 1855.22 1.61
14780.74 87.79 297.70 3,925.60 1,900.29 N 1,975.60 W 1900.29 2.21
14876.64 91.27 300.55 3,926.39 1,946.95 N 2,059.35 W 1946.95 4.69
14972.38 89.30 302.49 3,925.91 1,997.00 N 2,140.96 W 1997.00 2.89
15068.16 89.07 301.30 3,927.28 2,047.60 N 2,222.26 W 2047.60 1.27
15164.02 89.27 299.80 3,928.67 2,096.32 N 2,304.81 W 2096.32 1.58
15259.93 88.89 299.59 3,930.21 2,143.82 N 2,388.11 W 2143.82 0.45
15354.76 89.86 298.05 3,931.24 2,189.53 N 2,471.19 W 2189.53 1.92
15450.35 90.72 298.32 3,930.76 2,234.68 N 2,555.44 W 2234.68 0.94
15546.13 92.76 298.47 3,927.85 2,280.20 N 2,639.65 W 2280.20 2.14
15641.86 92.82 299.92 3,923.19 2,326.84 N 2,723.12 W 2326.84 1.51
15737.12 90.97 300.37 3,920.04 2,374.65 N 2,805.45 W 2374.65 2.00
15832.92 90.49 302.26 3,918.82 2,424.44 N 2,887.28 W 2424.44 2.04
15928.69 89.78 303.90 3,918.59 2,476.71 N 2,967.53 W 2476.71 1.87
16024.54 89.39 304.17 3,919.29 2,530.35 N 3,046.95 W 2530.35 0.49
16120.39 89.50 303.99 3,920.21 2,584.06 N 3,126.34 W 2584.06 0.22
INSITE V8.0.20 Page 2Job No:AK-XX-0901007074 Well Name:OP09-S1L1 PB1 Survey Report
DIRECTIONAL SURVEY DATA
(ft)
Measured Depth DoglegVertical SectionDeparture
(ft)
Latitude
(ft)
Vertical Depth
(deg)
DirectionInclination
(deg)(ft)(ft)(°/100')
16216.18 89.45 302.51 3,921.09 2,636.58 N 3,206.44 W 2636.58 1.55
16311.96 90.07 302.92 3,921.49 2,688.34 N 3,287.03 W 2688.34 0.78
16407.70 89.99 302.34 3,921.44 2,739.97 N 3,367.65 W 2739.97 0.61
16503.31 90.05 301.42 3,921.41 2,790.46 N 3,448.84 W 2790.46 0.96
16598.72 89.87 300.05 3,921.48 2,839.22 N 3,530.85 W 2839.22 1.45
16694.52 89.92 298.86 3,921.65 2,886.33 N 3,614.26 W 2886.33 1.24
16790.44 88.81 298.41 3,922.72 2,932.29 N 3,698.45 W 2932.29 1.25
16886.21 89.42 300.76 3,924.19 2,979.57 N 3,781.71 W 2979.57 2.53
16981.97 87.22 300.22 3,927.00 3,028.13 N 3,864.19 W 3028.13 2.37
17077.80 87.93 300.18 3,931.06 3,076.29 N 3,946.94 W 3076.29 0.74
17173.54 90.29 300.34 3,932.54 3,124.53 N 4,029.62 W 3124.53 2.47
DIRECTIONAL SURVEY DATA NOTES
- Calculation based on minimum curvature method.
- Survey coordinates relative to well system reference point.
- TVD values given relative to drilling measurement point.
- Vertical section relative to well head.
- Vertical section is computed along a direction of 0.00 degrees (Grid)
- A total correction of 0.00 deg from Magnetic north to Grid north has been applied
- Horizontal displacement is relative to the well head.
- Horizontal displacement (closure) at 17,173.54 feet is 5,099.07 feet along 307.79 degrees (Grid)
WARRANTY
HALLIBURTON ENERGY SERVICES, INC. WILL USE ITS BEST EFFORTS TO FURNISH CUSTOMERS WITH ACCURATE INFORMATION
AND INTERPRETATIONS THAT ARE PART OF, AND INCIDENT TO, THE SERVICES PROVIDED. HOWEVER, HALLIBURTON ENERGY
SERVICES, INC. CANNOT AND DOES NOT WARRANT THE ACCURACY OR CORRECTNESS OF SUCH INFORMATION AND
INTERPRETATIONS. UNDER NO CIRCUMSTANCES SHOULD ANY SUCH INFORMATION OR INTERPRETATION BE RELIED UPON AS
THE SOLE BASIS FOR ANY DRILLING, COMPLETION, PRODUCTION, OR FINANCIAL DECISION OR ANY PROCEDURE INVOLVING ANY
RISK TO THE SAFETY OF ANY DRILLING VENTURE, DRILLING RIG OR ITS CREW OR ANY THIRD PARTY. THE CUSTOMER HAS FULL
RESPONSIBILITY FOR ALL DRILLING, COMPLETION, AND PRODUCTION OPERATION. HALLIBURTON ENERGY SERVICES, INC.
MAKES NO REPRESENTATIONS OR WARRANTIES, EITHER EXPRESSED OR IMPLIED, INCLUDING, BUT NOT LIMITED TO, THE
IMPLIED WARRANTIES OF MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE, WITH RESPECT TO THE SERVICES
RENDERED. IN NO EVENT WILL HALLIBURTON ENERGY SERVICES, INC. SERVICES BE LIABLE FOR FAILURE TO OBTAIN ANY
PARTICULAR RESULTS OR FOR ANY DAMAGES, INCLUDING, BUT NOT LIMITED TO, INDIRECT, SPECIAL OR CONSEQUENTIAL
DAMAGES, RESULTING FROM THE USE OF ANY INFORMATION OR INTERPRETATION PROVIDED BY HALLIBURTON ENERGY
SERVICES, INC.
INSITE V8.0.20 Page 3Job No:AK-XX-0901007074 Well Name:OP09-S1L1 PB1 Survey Report