Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout185-229CAUTION: This email originated from outside the State of Alaska mail system. Do not click links or open attachments unless you recognize the sender and know the content is safe. From:Wallace, Chris D (OGC) To:AOGCC Records (CED sponsored) Subject:FW: NOT OPERABLE: PWI MPB-18 (PTD: 1852290) IA Over MOASP Date:Monday, November 3, 2025 9:37:09 AM Attachments:B-18 SCHEMATIC 11-7-2023.doc From: Stephen Soroka <steve.soroka@hilcorp.com> Sent: Sunday, November 2, 2025 3:11 PM To: Wallace, Chris D (OGC) <chris.wallace@alaska.gov> Cc: Regg, James B (OGC) <jim.regg@alaska.gov>; Ryan Thompson <Ryan.Thompson@hilcorp.com> Subject: NOT OPERABLE: PWI MPB-18 (PTD: 1852290) IA Over MOASP Chris, PWI MPB-18 (PTD: 1852290) broke MOASP today to 2126 psi. The Well was shut in and the IA was bled down to 1400 psi. The IA and tubing pressures are tracking. The well has been reclassified as Not Operable. The well will remain shut in while we perform diagnostic tests to determine the Tx IA communication and will require AOGCC approval to put back on injection. Attached 30-day plot and schematic. Forward plan: 1. PPPOT-T 2. MIT-IA 3. Further diagnostic/ repair or secure per OE. Please respond with any questions. Steve Soroka Hilcorp Alaska LLC Field Well Integrity Steve.Soroka@hilcorp.com P: (907) 830-8976 Alt: Chris Casey The information contained in this email message is confidential and may be legally privileged and is intended only for the use of the individual or entity named above. If you are not an intended recipient or if you have received this message in error, you are hereby notified that any dissemination, distribution, or copy of this email is strictly prohibited. If you have received this email in error, please immediately notify us by return email or telephone if the sender's phone number is listed above, then promptly and permanently deletethis message. While all reasonable care has been taken to avoid the transmission of viruses, it is the responsibility of the recipient to ensure that the onward transmission, opening, or use of this message and any attachments will not adversely affect its systems or data. No responsibilityis accepted by the company in this regard and the recipient should carry out such virus and other checks as it considers appropriate. Well: MPB-111 4.1 3.f 3.f 3.1 3.: 3.f 2.f 2.f 2.1 32.: 2.f 1.f a l.f 1/ 1,: t.f 300 280 260 240 220 TIO Plot 2DO 190 160 a gr 140 120 m 100 fD W 40 20 Tubing On ■ Bleed ♦ Operable + Not Oper ♦ Under Eval f Man. IA Man. OA Man. OOA 40 Man. OOOA $ Man. WHT _____________________________________________________________________________________ Created By: DH 11/6/2023 SCHEMATIC Milne Point Unit Well: MPU B-18 Last Completed: 10/4/1985 PTD: 185-229 CASING DETAIL Size Type Wt/ Grade/ Conn Drift ID Top Btm 13-3/8” Conductor 48# / H-40 / PELP N/A Surf 115' 9-5/8" Surface 36# / K-55 / BTRC 8.765 Surf 6,405’ 7" Production 29# / L-80 / BTRC 6.151 Surf 10,908’ TUBING DETAIL 3-1/2" Tubing 9.2# / L-80 / BTRS 2.867” Surf 10,441’ JEWELRY DETAIL No Depth ID Item 1 1,892’ 2.812” Camco TRDP-IA-SSA SCSSV 2 10,127’ 3.00” Baker Polish Bore Receptable, Seal Assembly 3 10,146’ 2.89” Baker ‘HB’ Retrievable Packer 4 10,183’ 2.813” Camco ‘W-1’ Selective Nipple 5 10,217’ 2.90” Camco 1-1/2” ‘MMG-2’ Gas Lift Mandrel 6 10,260’ 2.90” Camco 1-1/2” ‘MMG-2’ Gas Lift Mandrel 7 10,301 3.0” Blast Joints, 78.41’ total length, 4-1/2” 8 10,408’ Brown ‘CL’ Locator Seal Assembly 9 10,413’ Brown ‘2B’ Permanent Packer and Seal Bore Ext. (5.875” OD, 4.0” ID) and Millout Ext. (5.0” OD, 4.408” ID) 10 10,434 2.75” Camco ‘D’ Nipple w/plug 11 10,441 Tubing Tail PERFORATION DETAIL Sands Top (MD) Btm (MD) Top (TVD) Btm (TVD) FT Date Status Kup B7 10,314’ 10,381’ 6,957’ 6,998 67 10/2/1985 Open Kup A3 10,674’ 10,703’ 7,175’ 7,192’ 29 10/2/1985 Closed OPEN HOLE / CEMENT DETAIL 13-3/8" Permafrost “E” cement in 17-1/2”” hole 9-5/8" 601 bbls (1,715 sx) of Permafrost “E” & 56 bbls (275 sx) Class “G” & 30sx Permafrost “E” cement in 12-1/4” hole 7” 78 bbls (330 sx) Class “G” cement in 8-1/2” hole plus 180 sx Permafrost “C” followed by 60 bbls Arctic Pak WELL INCLINATION DETAIL KOP @ 650’ Max Hole Angle =56 deg. @ 4,700’ Hole Angle through perforations = 53 deg. TREE & WELLHEAD Tree 3-1/2” Wellhead 11” 5M FMC w/ 3-1/2” FMC Tbg. Hng. GENERAL WELL INFO API: 50-029-21450-00-00 Drilled and Cased by Nabors 27E - 10/4/1985 CAUTION: This email originated from outside the State of Alaska mail system. Do not click links or open attachments unless you recognize the sender and know the content is safe. From:Wallace, Chris D (OGC) To:AOGCC Records (CED sponsored) Subject:FW: Under Evaluation: MPB-18 (PTD # 1852290)- OA Repressurization Date:Tuesday, September 2, 2025 3:01:39 PM Attachments:B-18 SCHEMATIC 11-7-2023.doc From: Stephen Soroka <steve.soroka@hilcorp.com> Sent: Tuesday, September 2, 2025 2:57 PM To: Wallace, Chris D (OGC) <chris.wallace@alaska.gov> Cc: Regg, James B (OGC) <jim.regg@alaska.gov>; Ryan Thompson <Ryan.Thompson@hilcorp.com> Subject: RE: Under Evaluation: MPB-18 (PTD # 1852290)- OA Repressurization Mr. Wallace, PWI MPB-18 (PTD: 1852290) was placed UNDER EVALUATION on 8/6/25. Since then we have performed a Passing PPPOT-IC to 3000 psi and a Passing PPPOT-T to 5000 psi. The OA was bled down and has shown stabilization. See attached 30 day plot. The well will now be reclassified as Operable. Please respond with any questions. Steve From: Stephen Soroka Sent: Wednesday, August 6, 2025 3:53 PM To: Wallace, Chris D (OGC) <chris.wallace@alaska.gov> Cc: jim.regg <jim.regg@alaska.gov>; Ryan Thompson <Ryan.Thompson@hilcorp.com> Subject: Under Evaluation: MPB-18 (PTD # 1852290)- OA Repressurization Mr. Wallace, PWI MPB-18 (PTD# 1852290) had a passing MIT-IA in February 2025. The well is typically cycled on and off every week. Recently, when the well was put on injection, the OA pressure increased with the IA pressure. The OA was bled down, and the OA pressure has been increasing, as shown in the attached 30-day TIO plot. The well is now classified as UNDER EVALUATION and on a 28-day clock while we perform diagnostic tests to determine the cause of the OA repressurization. Plan forward: 1. PPPOT-IC 2. Additional diagnostic, as necessary. Please call with any questions or concerns. Steve Soroka Hilcorp Alaska LLC Field Well Integrity Steve.Soroka@hilcorp.com P: (907) 830-8976 Alt: Chris Casey The information contained in this email message is confidential and may be legally privileged and is intended only for the use of theindividual or entity named above. If you are not an intended recipient or if you have received this message in error, you are herebynotified that any dissemination, distribution, or copy of this email is strictly prohibited. If you have received this email in error, please immediately notify us by return email or telephone if the sender's phone number is listed above, then promptly and permanently delete this message. While all reasonable care has been taken to avoid the transmission of viruses, it is the responsibility of the recipient to ensure that theonward transmission, opening, or use of this message and any attachments will not adversely affect its systems or data. No responsibilityis accepted by the company in this regard and the recipient should carry out such virus and other checks as it considers appropriate. Well: MPB-19 4.000 300 3,800 IN ♦ IN 280 3,600 3.400 260 3,200 240 T1O Plot 3.000 220 2,800 200 }Tubing 2600 — On ,02.400 180 y Bleed 12,2W 160 m + Operable = 2 000 _ t Not Oper 1.800 140 ♦ Under Eval a 1.600 120 m f Man. IA 1,400 100 —A Man. OA 1,200 Man. OOA 1.000 so �— Man. OOOA 800 60 $ Man. WHT 600 40 400 200 20 0=0 0110A25 O&06±25 0=0 0&1025 Wl2r25 OB11425 0 1625 0&1825 0&2N25 082225 0824125 U&2625 MM5 0&3025 0&0125 _____________________________________________________________________________________ Created By: DH 11/6/2023 SCHEMATIC Milne Point Unit Well: MPU B-18 Last Completed: 10/4/1985 PTD: 185-229 CASING DETAIL Size Type Wt/ Grade/ Conn Drift ID Top Btm 13-3/8” Conductor 48# / H-40 / PELP N/A Surf 115' 9-5/8" Surface 36# / K-55 / BTRC 8.765 Surf 6,405’ 7" Production 29# / L-80 / BTRC 6.151 Surf 10,908’ TUBING DETAIL 3-1/2" Tubing 9.2# / L-80 / BTRS 2.867” Surf 10,441’ JEWELRY DETAIL No Depth ID Item 1 1,892’ 2.812” Camco TRDP-IA-SSA SCSSV 2 10,127’ 3.00” Baker Polish Bore Receptable, Seal Assembly 3 10,146’ 2.89” Baker ‘HB’ Retrievable Packer 4 10,183’ 2.813” Camco ‘W-1’ Selective Nipple 5 10,217’ 2.90” Camco 1-1/2” ‘MMG-2’ Gas Lift Mandrel 6 10,260’ 2.90” Camco 1-1/2” ‘MMG-2’ Gas Lift Mandrel 7 10,301 3.0” Blast Joints, 78.41’ total length, 4-1/2” 8 10,408’ Brown ‘CL’ Locator Seal Assembly 9 10,413’ Brown ‘2B’ Permanent Packer and Seal Bore Ext. (5.875” OD, 4.0” ID) and Millout Ext. (5.0” OD, 4.408” ID) 10 10,434 2.75” Camco ‘D’ Nipple w/plug 11 10,441 Tubing Tail PERFORATION DETAIL Sands Top (MD) Btm (MD) Top (TVD) Btm (TVD) FT Date Status Kup B7 10,314’ 10,381’ 6,957’ 6,998 67 10/2/1985 Open Kup A3 10,674’ 10,703’ 7,175’ 7,192’ 29 10/2/1985 Closed OPEN HOLE / CEMENT DETAIL 13-3/8" Permafrost “E” cement in 17-1/2”” hole 9-5/8" 601 bbls (1,715 sx) of Permafrost “E” & 56 bbls (275 sx) Class “G” & 30sx Permafrost “E” cement in 12-1/4” hole 7” 78 bbls (330 sx) Class “G” cement in 8-1/2” hole plus 180 sx Permafrost “C” followed by 60 bbls Arctic Pak WELL INCLINATION DETAIL KOP @ 650’ Max Hole Angle =56 deg. @ 4,700’ Hole Angle through perforations = 53 deg. TREE & WELLHEAD Tree 3-1/2” Wellhead 11” 5M FMC w/ 3-1/2” FMC Tbg. Hng. GENERAL WELL INFO API: 50-029-21450-00-00 Drilled and Cased by Nabors 27E - 10/4/1985 CAUTION: This email originated from outside the State of Alaska mail system. Do not click links or open attachments unless you recognize the sender and know the content is safe. From:Wallace, Chris D (OGC) To:AOGCC Records (CED sponsored) Subject:FW: Under Evaluation: MPB-18 (PTD # 1852290)- OA Repressurization Date:Tuesday, August 12, 2025 4:19:19 PM Attachments:B-18 SCHEMATIC 11-7-2023.doc From: Stephen Soroka <steve.soroka@hilcorp.com> Sent: Wednesday, August 6, 2025 3:53 PM To: Wallace, Chris D (OGC) <chris.wallace@alaska.gov> Cc: Regg, James B (OGC) <jim.regg@alaska.gov>; Ryan Thompson <Ryan.Thompson@hilcorp.com> Subject: Under Evaluation: MPB-18 (PTD # 1852290)- OA Repressurization Mr. Wallace, PWI MPB-18 (PTD# 1852290) had a passing MIT-IA in February 2025. The well is typically cycled on and off every week. Recently, when the well was put on injection, the OA pressure increased with the IA pressure. The OA was bled down, and the OA pressure has been increasing, as shown in the attached 30-day TIO plot. The well is now classified as UNDER EVALUATION and on a 28-day clock while we perform diagnostic tests to determine the cause of the OA repressurization. Plan forward: 1. PPPOT-IC 2. Additional diagnostic, as necessary. Please call with any questions or concerns. Steve Soroka Hilcorp Alaska LLC Field Well Integrity Steve.Soroka@hilcorp.com P: (907) 830-8976 Alt: Chris Casey The information contained in this email message is confidential and may be legally privileged and is intended only for the use of the individual or entity named above. If you are not an intended recipient or if you have received this message in error, you are hereby notified that any dissemination, distribution, or copy of this email is strictly prohibited. If you have received this email in error, pleaseimmediately notify us by return email or telephone if the sender's phone number is listed above, then promptly and permanently delete this message. While all reasonable care has been taken to avoid the transmission of viruses, it is the responsibility of the recipient to ensure that theonward transmission, opening, or use of this message and any attachments will not adversely affect its systems or data. No responsibilityis accepted by the company in this regard and the recipient should carry out such virus and other checks as it considers appropriate. _____________________________________________________________________________________ Created By: DH 11/6/2023 SCHEMATIC Milne Point Unit Well: MPU B-18 Last Completed: 10/4/1985 PTD: 185-229 CASING DETAIL Size Type Wt/ Grade/ Conn Drift ID Top Btm 13-3/8” Conductor 48# / H-40 / PELP N/A Surf 115' 9-5/8" Surface 36# / K-55 / BTRC 8.765 Surf 6,405’ 7" Production 29# / L-80 / BTRC 6.151 Surf 10,908’ TUBING DETAIL 3-1/2" Tubing 9.2# / L-80 / BTRS 2.867” Surf 10,441’ JEWELRY DETAIL No Depth ID Item 1 1,892’ 2.812” Camco TRDP-IA-SSA SCSSV 2 10,127’ 3.00” Baker Polish Bore Receptable, Seal Assembly 3 10,146’ 2.89” Baker ‘HB’ Retrievable Packer 4 10,183’ 2.813” Camco ‘W-1’ Selective Nipple 5 10,217’ 2.90” Camco 1-1/2” ‘MMG-2’ Gas Lift Mandrel 6 10,260’ 2.90” Camco 1-1/2” ‘MMG-2’ Gas Lift Mandrel 7 10,301 3.0” Blast Joints, 78.41’ total length, 4-1/2” 8 10,408’ Brown ‘CL’ Locator Seal Assembly 9 10,413’ Brown ‘2B’ Permanent Packer and Seal Bore Ext. (5.875” OD, 4.0” ID) and Millout Ext. (5.0” OD, 4.408” ID) 10 10,434 2.75” Camco ‘D’ Nipple w/plug 11 10,441 Tubing Tail PERFORATION DETAIL Sands Top (MD) Btm (MD) Top (TVD) Btm (TVD) FT Date Status Kup B7 10,314’ 10,381’ 6,957’ 6,998 67 10/2/1985 Open Kup A3 10,674’ 10,703’ 7,175’ 7,192’ 29 10/2/1985 Closed OPEN HOLE / CEMENT DETAIL 13-3/8" Permafrost “E” cement in 17-1/2”” hole 9-5/8" 601 bbls (1,715 sx) of Permafrost “E” & 56 bbls (275 sx) Class “G” & 30sx Permafrost “E” cement in 12-1/4” hole 7” 78 bbls (330 sx) Class “G” cement in 8-1/2” hole plus 180 sx Permafrost “C” followed by 60 bbls Arctic Pak WELL INCLINATION DETAIL KOP @ 650’ Max Hole Angle =56 deg. @ 4,700’ Hole Angle through perforations = 53 deg. TREE & WELLHEAD Tree 3-1/2” Wellhead 11” 5M FMC w/ 3-1/2” FMC Tbg. Hng. GENERAL WELL INFO API: 50-029-21450-00-00 Drilled and Cased by Nabors 27E - 10/4/1985 MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission DATE:Tuesday, April 1, 2025 SUBJECT:Mechanical Integrity Tests TO: FROM:Kam StJohn P.I. Supervisor Petroleum Inspector NON-CONFIDENTIAL Hilcorp Alaska, LLC B-18 MILNE PT UNIT B-18 Jim Regg InspectorSrc: Reviewed By: P.I. Suprv Comm ________ JBR 04/01/2025 B-18 50-029-21450-00-00 185-229-0 W SPT 6854 1852290 1714 2480 2475 2473 2466 595 720 703 692 4YRTST P Kam StJohn 2/22/2025 4 Year MIT-IA 30 MinPretestInitial15 Min Well Name Type Test Notes: Interval P/F Well Permit Number: Type Inj TVD PTD Test psi API Well Number Inspector Name:MILNE PT UNIT B-18 Inspection Date: Tubing OA Packer Depth 560 1925 1900 1879IA 2475 680 45 Min 1864 60 Min Rel Insp Num: Insp Num:mitKPS250222111043 BBL Pumped:1 BBL Returned:1 Tuesday, April 1, 2025 Page 1 of 1 9 9 9 9 9 9 9 9 9999 9 9 99 9 9 James B. Regg Digitally signed by James B. Regg Date: 2025.04.01 12:12:55 -08'00' CAUTION: This email originated from outside the State of Alaska mail system. Do not click links or open attachments unless you recognize the sender and know the content is safe. From:Wallace, Chris D (OGC) To:AOGCC Records (CED sponsored) Subject:FW: Operable: MPB-18 (PTD# 185229) - OA Re-Pressurization Date:Tuesday, December 5, 2023 3:57:56 PM Attachments:MPB-18 TIO 12-5-23.docx From: Ryan Thompson <Ryan.Thompson@hilcorp.com> Sent: Tuesday, December 5, 2023 9:59 AM To: Wallace, Chris D (OGC) <chris.wallace@alaska.gov>; Regg, James B (OGC) <jim.regg@alaska.gov> Cc: Taylor Wellman <twellman@hilcorp.com> Subject: Operable: MPB-18 (PTD# 185229) - OA Re-Pressurization Mr. Wallace, On 11/13/23 PWI injector MPB-18 (PTD# 185229) had the IA pressure increased with Nitrogen from 380 psi to 1000 psi to establish a positive differential pressure to the OA. Since that time the IA pressure has maintained a 600-700 pound differential to the OA indicating the lack of IAxOA communication. The well will now be re-classified to OPERABLE. Attached is a 90 day TIO plot. Please respond with any questions. Thank you, Ryan Thompson Milne / Islands Well Integrity Engineer 907-564-5005 From: Ryan Thompson Sent: Tuesday, November 7, 2023 3:06 PM To: Wallace, Chris D (OGC) <chris.wallace@alaska.gov>; Regg, James B (OGC) <jim.regg@alaska.gov> Cc: Taylor Wellman <twellman@hilcorp.com> Subject: UNDER EVALUATION: MPB-18 (PTD# 185229) - OA Re-Pressurization Mr. Wallace, On 10/31/23 PWI injector MPB-18 (PTD# 185229) had the OA bled from 700 psi to 60 psi. On 11/1/23 a PPPOT-IC on the wellhead passed to 3000 psi. The OA pressure has increased back to 280 psi, within 100 psi of the IA. The well is now classified as UNDER EVALUATION to determine if the OA repressurization is due to IxO communication or thermal effects. Plan forward: 1. Increase IA pressure w/ gas to ~1000 psi. Monitor for IxO communication. 2. Contingent MIT-IA - if monitor period indicates IxO. The WBS and 90 day TIO plot are attached. Please let me know if you have any questions. Thanks, Ryan Thompson Milne / Islands Well Integrity Engineer 907-564-5005 The information contained in this email message is confidential and may be legally privileged and is intended only for the use of the individual or entity named above. If you are not an intended recipient or if you have received this message in error, you are hereby notified that any dissemination, distribution, or copy of this email is strictly prohibited. If you have received this email in error, please immediately notify us by return email or telephone if the sender's phone number is listed above, then promptly and permanently deletethis message. While all reasonable care has been taken to avoid the transmission of viruses, it is the responsibility of the recipient to ensure that theonward transmission, opening, or use of this message and any attachments will not adversely affect its systems or data. No responsibilityis accepted by the company in this regard and the recipient should carry out such virus and other checks as it considers appropriate. CAUTION: This email originated from outside the State of Alaska mail system. Do not click links or open attachments unless you recognize the sender and know the content is safe. From:Wallace, Chris D (OGC) To:AOGCC Records (CED sponsored) Subject:FW: UNDER EVALUATION: MPB-18 (PTD# 185229) - OA Re-Pressurization Date:Tuesday, November 7, 2023 4:43:50 PM Attachments:B-18 SCHEMATIC 11-7-2023.doc MPB-18 TIO.docx From: Ryan Thompson <Ryan.Thompson@hilcorp.com> Sent: Tuesday, November 7, 2023 3:06 PM To: Wallace, Chris D (OGC) <chris.wallace@alaska.gov>; Regg, James B (OGC) <jim.regg@alaska.gov> Cc: Taylor Wellman <twellman@hilcorp.com> Subject: UNDER EVALUATION: MPB-18 (PTD# 185229) - OA Re-Pressurization Mr. Wallace, On 10/31/23 PWI injector MPB-18 (PTD# 185229) had the OA bled from 700 psi to 60 psi. On 11/1/23 a PPPOT-IC on the wellhead passed to 3000 psi. The OA pressure has increased back to 280 psi, within 100 psi of the IA. The well is now classified as UNDER EVALUATION to determine if the OA repressurization is due to IxO communication or thermal effects. Plan forward: 1. Increase IA pressure w/ gas to ~1000 psi. Monitor for IxO communication. 2. Contingent MIT-IA - if monitor period indicates IxO. The WBS and 90 day TIO plot are attached. Please let me know if you have any questions. Thanks, Ryan Thompson Milne / Islands Well Integrity Engineer 907-564-5005 The information contained in this email message is confidential and may be legally privileged and is intended only for the use of theindividual or entity named above. If you are not an intended recipient or if you have received this message in error, you are herebynotified that any dissemination, distribution, or copy of this email is strictly prohibited. If you have received this email in error, pleaseimmediately notify us by return email or telephone if the sender's phone number is listed above, then promptly and permanently delete _____________________________________________________________________________________ Created By: DH 11/6/2023 SCHEMATIC Milne Point Unit Well: MPU B-18 Last Completed: 10/4/1985 PTD: 185-229 CASING DETAIL Size Type Wt/ Grade/ Conn Drift ID Top Btm 13-3/8” Conductor 48# / H-40 / PELP N/A Surf 115' 9-5/8" Surface 36# / K-55 / BTRC 8.765 Surf 6,405’ 7" Production 29# / L-80 / BTRC 6.151 Surf 10,908’ TUBING DETAIL 3-1/2" Tubing 9.2# / L-80 / BTRS 2.867” Surf 10,441’ JEWELRY DETAIL No Depth ID Item 1 1,892’ 2.812” Camco TRDP-IA-SSA SCSSV 2 10,127’ 3.00” Baker Polish Bore Receptable, Seal Assembly 3 10,146’ 2.89” Baker ‘HB’ Retrievable Packer 4 10,183’ 2.813” Camco ‘W-1’ Selective Nipple 5 10,217’ 2.90” Camco 1-1/2” ‘MMG-2’ Gas Lift Mandrel 6 10,260’ 2.90” Camco 1-1/2” ‘MMG-2’ Gas Lift Mandrel 7 10,301 3.0” Blast Joints, 78.41’ total length, 4-1/2” 8 10,408’ Brown ‘CL’ Locator Seal Assembly 9 10,413’ Brown ‘2B’ Permanent Packer and Seal Bore Ext. (5.875” OD, 4.0” ID) and Millout Ext. (5.0” OD, 4.408” ID) 10 10,434 2.75” Camco ‘D’ Nipple w/plug 11 10,441 Tubing Tail PERFORATION DETAIL Sands Top (MD) Btm (MD) Top (TVD) Btm (TVD) FT Date Status Kup B7 10,314’ 10,381’ 6,957’ 6,998 67 10/2/1985 Open Kup A3 10,674’ 10,703’ 7,175’ 7,192’ 29 10/2/1985 Closed OPEN HOLE / CEMENT DETAIL 13-3/8" Permafrost “E” cement in 17-1/2”” hole 9-5/8" 601 bbls (1,715 sx) of Permafrost “E” & 56 bbls (275 sx) Class “G” & 30sx Permafrost “E” cement in 12-1/4” hole 7” 78 bbls (330 sx) Class “G” cement in 8-1/2” hole plus 180 sx Permafrost “C” followed by 60 bbls Arctic Pak WELL INCLINATION DETAIL KOP @ 650’ Max Hole Angle =56 deg. @ 4,700’ Hole Angle through perforations = 53 deg. TREE & WELLHEAD Tree 3-1/2” Wellhead 11” 5M FMC w/ 3-1/2” FMC Tbg. Hng. GENERAL WELL INFO API: 50-029-21450-00-00 Drilled and Cased by Nabors 27E - 10/4/1985 David Douglas Hilcorp Alaska, LLC Sr. GeoTechnician 3800 Centerpoint Drive, Suite 1400 Anchorage, AK 99503 Tele: 907 777-8337 E-mail: david.douglas@hilcorp.com Please acknowledge receipt by signing and returning one copy of this transmittal Received By: Date: Date: 10/27/2022 To: Alaska Oil & Gas Conservation Commission Natural Resource Technician 333 W 7th Ave Suite 100 Anchorage, AK 99501 DATA TRANSMITTAL MPU B-18 -PTD 185-229 -API 50-029-21450-00-00 Gyrodata Survey 07/17/2022 Definitive Gyro + MWD Composite Survey Main Folder Contents: Definitive Survey Sub-Folder Contents: Gyrodata Sub-Folder Contents: Please include current contact information if different from above. PTD: 185-229 T37206 Kayla Junke Digitally signed by Kayla Junke Date: 2022.10.28 09:05:01 -08'00' MEMORANDUM TO: Jim Regg 2� P.1. Supervisor It FROM: Adam Earl Petroleum Inspector NON -CONFIDENTIAL State of Alaska Alaska Oil and Gas Conservation Commission DATE: Tuesday, February 23, 2021 SUBJECT: Mechanical Integrity Tests Hdcorp Alaska, LLC B-18 MILNE PT UNIT B. 18 Site: Inspector Reviewed By: P.I. Sulam Comm Well Name MILNE PT UNIT B-18 API Well Number 50-029-21450-00-00 Inspector Name: Adam Furl Permit Number: 185-229-0 Inspection Date: 2/16/2021 ' Insp Num: mitAGE210221080427 Rel Insp Num: Packer Depth Pretest Initial 15 Min 30 Min 45 Min 60 Min Well B-18 •Type Inj w -ITVD 6854 Tubing' 2363 2363 2358 2356 2354 2355 PTD 1852290 ' Type Test sPT' Test psi 1714 IA 502 1995 1984 - 1986 1984 1978 BBL Pumped: 1.2 ' BBL Returned: 1.z OA z66 408 394• 402 - 405 401 - Interval _4YRTST -- P/F P _,I Notes: MIT IA Had Some thermal involved, ran it out to be certain it was sound. Tuesday, February 23, 2021 Page 1 of 1 • • MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission TO: DATE: Tuesday,February 28,2017 Jim Regg P.I.Supervisor \1i- SUBJECT: Mechanical Integrity Tests `�" HILCORP ALASKA LLC .t'�'�� B-18 FROM: Chuck Scheve MILNE PT UNIT B-18 Petroleum Inspector Src: Inspector Reviewed By: P.I.Supry NON-CONFIDENTIAL Comm Well Name MILNE PT UNIT B-18 API Well Number 50-029-21450-00-00 Inspector Name: Chuck Scheve Permit Number: 185-229-0 Inspection Date: 2/17/2017 Insp Num: mitCS170218130529 Rel Insp Num: Packer Depth Pretest Initial 15 Min 30 Min 45 Min 60 Min Well 1 B-18 Type Inj W TVD 6854 .../Tubing 1997 2000 2000 2000 PTD 1852290 Type Test SPT Test psi 1714 IA 379 2695 2686 2681- -------- --- — --- - - -------- --------------- BBL Pumped: 1.6 BBL Returned: 1.8 OA 154 365 361 358 Interval ; 4YRTST P/F P Notes: SCANNED APR 2 8 2017 Tuesday,February 28,2017 Page 1 of 1 FW: OPERABLE: MPB-18 (P~#1852290) OA pressure stable - TIO ~t attached Page 1 0~ Regg, James B (DOA) From: NSU, ADW Well Integrity Engineer [NSUADWWeIIlntegrityEngineer@BP.com] Sent: Tuesday, March 31, 2009 7:37 AM ~~ ~,I I ~~`i To: Regg, James B (DOA); Maunder, Thomas E (DOA) ~~ Subject: FW: OPERABLE: MPB-18 (PTD #1852290) OA pressure stable - TIO Plot attached Attachments: MPB-18 TIO Plot.doc Jim and Tom, I have attached a TIO plot for your reference «MPB-18 TIO Plot.doc» Sorry to not have included it originally. Thank you, Andrea ~,,. ti:a~~~~~~ ~~~ ~ ~ ~~4j From: NSU, ADW Well Integrity Engineer Sent: Tuesday, March 31, 2009 7:34 AM To: 'Regg, James B (DOA)'; 'Maunder, Thomas E (DOA)'; MPU, Area Manager; MPU, Well Operations Supervisor; MPU, Field Lead Tech; MPU, Wells Ops Coord; MPU, Wells Ops Coord2; Rossberg, R Steven; Engel, Harry R; NSU, ADW Well Operations Supervisor Cc: Rupert, C. Ryan; Quy, Tiffany; Townsend, S. Eliot; NSU, ADW Well Integrity Engineer Subject: OPERABLE: MPB-18 (PTD #1852290) OA pressure stable All, Well MPB-18 (PTD #1852290) has maintained between 600 and 700 psi diffe ntial pressure between the IA and OA since 03/21/09 when the IA was pressured to 1000 psi with nitrogen a the OA was bled to 0 psi. The well passed an AOGCC witness MIT-IA to 2,820 psi on 02/21/09 and passe PPPOT-IC on 03/31/08. The well has been reclassified as Operable, but will remain on the Monthly Injectio report for further evaluation to determine if an Administrative Approval is needed. Please call with any questions or concerns. Thank you, Andrea Hughes Well Integrity Coordinator Office: (907) 659-5102 Pager: (907) 659-5100 x1154 From: NSU, ADW Well Integrity Engineer Sent: Friday, March 13, 2009 8:02 PM To: 'Regg, James B (DOA)'; 'Maun , Thomas E (DOA)'; MPU, Area Manager; MPU, Well Operations Supervisor; MPU, Field Lead Tech; MPU, Wells Ops Coord; MPU, Wells Ops Coord ossberg, R Steven; Engel, Harry R; NSU, ADW Well Operations Supervisor Cc: NSU, ADW Well Int rity Engineer; Rupert, C. Ryan; Quy, Tiffany Subject: UNDER ALUATION: MPB-18 (PTD #1852290) Sustained OA Casing Pressure Hi All, 4/1/2009 MPU B-18 PTD 1852290 3/31/2009 4.000 TIO Pressures ....................................... • ~~,~1~~ ?,000 1,000 ~- Tbg -~ IA -~ OA OOA ODOR On 01?00?09 01?10?09 01?1~?09 01?~~?09 01?01'09 OZ?07?09 02?14?09 02?Z1?09 02?2a?09 OO~~Oi?09 03?14!09 03?21?09 03?~$?09 UNDER EVALUATION: MP~8 (PTD #1852290) Sustained OA Cas~ Pressure Page 1 of 2 Regg, James B (DOA) From: NSU, ADW Well Integrity Engineer [NSUADWWeIIlntegrityEngineer@BP.com] Sent: Friday, March 13, 2009 8:02 PM '~C~~ ¢ ~~~~~ To: Regg, James B (DOA); Maunder, Thomas E (DOA); MPU, Area Manager; MPU, Well l 1 Operations Supervisor; MPU, Field Lead Tech; MPU, Wells Ops Coord; MPU, Wells Ops Coord2; Rossberg, R Steven; Engel, Harry R; NSU, ADW Well Operations Supervisor Cc: NSU, ADW Well Integrity Engineer; Rupert, C. Ryan; Quy, Tiffany Subject: UNDER EVALUATION: MPB-18 (PTD #1852290) Sustained OA Casing Pressure Attachments: MPB-18 TIO Plot.doc; MPB-18.pdf; MPB-18 Casing.pdf Hi All, Well MPB-18 (PTD #1852290) is a produced water injector that until recently has been shut-in. The well is now exhibiting sustained OA casing pressure. The OA pressure was bled from 1400 psi to 500 psi on 03/09/09 and repressured to 1000 psi in two days. The well has been reclassified as Under Evaluation. At this point, it is unclear as to the cause of the OA pressure. The plan forward includes bleeding the OA pressure and monitoring the pressure build-up rate. The well will also be evaluated for loading the OA with a heavier fluid. The well has been added to the AOGCC Monthly Injection Report. A TIO plot and wellbore schematic have been included for reference. «MPB-18 TIO Plot.doc» «MPB-18.pdf» «MPB-18 Casing.pdf» Please let me know if you have any questions. Thank you, Anna ~Du6e, ~P. E. Well Integrity Coordinator GPB Wells Group Phone: (907) 659-5102 Pager: (907) 659-5100 x1154 From: NSU, ADW Well Integrity Engineer Sent: Monday, March 02, 2009 1:50 PM To: 'Regg, James B (DOA)'; 'Maunder, Thomas E (DOA)' Cc: MPU, Area Manager; MPU, Well Operations Supervisor; MPU, Field Lead Tech; MPU, Wells Ops Coord; MPU, Wells Ops Coord2; Rossberg, R Steven; Engel, Harry R; NSU, ADW Well Operations Supervisor; Lopez, Keith; NSU, ADW Well Integrity Engineer; Townsend, S. Eliot Subject: UNDER EVALUATION: MPJ-02 (PTD #1900960) Potential IAxOA communication Jim and Tom, MPJ-02 (PTD #1900960) has been found to have potential IAxOA communication indicated by trends on a TIO plot. In addition, an IA bleed was performed on 02/26/09 to find an overnight build up of -100 psi; which may have been a thermal response and will require further diagnostics. The well has been reclassified as Under Evaluation and is planned to remain on PWI while diagnostics occur. The plan forward for the well is as follows: 1. W: PPPOT-IC, energize seals if needed 4/1/2009 UNDER EVALUATION: MP~8 (PTD #1852290) Sustained OA Cas~Pressure Page 2 of 2 2. D: Bleed OAP and obtain build up rate if present 3. WIC: Eval for AA A TIO plot, injection plot and wellbore schematic have been included for reference. Please call with any questions or concerns. Thank you, Andrea Hughes Well Integrity Coordinator Office: (907) 659-5102 Pager: (907) 659-5100 x1154 4/1/2009 MPU B-18 PTD #1852290 3/13/2009 TIO Pressures 4,000 ~ .-.._.~.~~._._.~._._._. • 3,000 ^ IA 2,000 -~-- OA OOA OOOA 1,000 ~'~~ ~ On 12113108 12!20108 12127!08 01!03!09 01110!09 01117!09 0112d,'09 01!31!09 02107109 02114!09 02121!09 02!23./09 03!07!09 u • ~~~A~"' WELL No. B--18 COMPLETION SKETCH ~ ~ ~~-ZZ-~ MILNE POINT UNIT (I) API No.: 50-029-21450 PERMIT No.: $5-229 COMPLETED: 10/5/85 LAST WORKOVER: N/A NOTES; 1. ALL MEASUREMENTS ARE FROM KDB OF NABOBS RIG N0. 27E KDB - SL = 59' KDB - Gl = 35' 2. MAX. ANGLE = 56' 9? 4700' 3. K.O.P. = 65O' 4. SLANT HOLE: YES 5. MIN. ANGLE = 51.5' AT 9900' 6. TREE TYPE: FMC 3 1/8" API 5000 WITH 3 1/2" 8 RD. TREETOP CONNECTION. 7. MlN. RESTRICTION IS CAMCO 'D' NIPPLE AT 10,434' (2.75" ID) 8. COMPLETION FLUID: 10.2 PPG NoCI-Naar BRINE AND DIESEL FMC TUBING HANGER W/ 3 1/2" 'H' BPV PROFILE 1/2", 9.2~ L-80 BUTTRESS TUBING (2.992" )., 2.867" DRIFT) 392' CAMCO TRDP-iA-SSA SCSSV (2.812" ID) ),127' BOT PBR, SEAL ASSEMBLY (3.00" ID) ),146' BOT 'H$' RETRIEVABLE PACKER (2.89" ID) ),183' CAMCO 'W-1' SELECTIVE NIPPLE {2.813" 10) ).217' CAMCO 'MMG-Z' GAS LIFT MANDREL PERFORATIONS: 2.90" ID, 1.5' VALVES 12 SPF AT 120' PHASING, 5" GUNS ),260' CAMCO 'MMG-2' GAS UFT MANDREL ' VALVES 2.90" ID, 1.5 MK-1, MK-2 ),301' BLAST JOINTS (?8.41' TOTAL LENGTH, 10,314'-10,381' MD 4.5" OD, 3.0" 10} 6957'-6998' TVD lK-1 10,674'-10,703' MD 7175'-7192' TVD ),408' BROWN 'CL' LOCATOR SEAL ASSEMBLY (BASED ON DIL LOG OF 9-30-85) 1,413' BROWN '26' PERMANENT PACKER do SEAL BORE EXT. (5.875" 00, 4.0" ID) do MILLOUT EXT. (5.0' OD, 4.408" ID) 1,434' CAMCO 'D' NIPPLE (2.75" ID) W/ PLUG 1,441' TUBING TAIL 1,760' TAG FILL 3/1/87, E-LINE ),83i' PBTD (WIRELINE MEAS.] 1,908' 7", 29 LB/FT L-80 BTRS CSG (6.184" ID, 6.059" DRIFT) CONOGO INC. APPROVED BY: JHA/HDS DATE; 03/26/92 ANCHORAGE DIVISION DRAFTED BY: SJN CAD FILE: WC0618 WELL No. H-18 CASING SKETCH MILNE POINT UNIT (I) AP! Na.: 50-029-21450 PERMIT No.: 85-229 DRILLED: 10/2/85 ARCTIC PACKED: 1/23/66 OPERATOR; CONOCO INC. SURFACE LOCATION: 813'FSL, 702'FWL, SEC 18, T13N, RitE, UM BOTTOM HOLE LOCATION: 1552'FSL, 1381'FEL, SEC 14. T13N, R10E, UM SPUD DATE: 9/17/85 ~~- FMC CSG SPOOL RKB = 32' 13 3/8",48~l,H-40,PELP, SET ~ 115' ~i I~ I'~s - z~z`~ 7' X 9 5/8' ARCTIC PACK DATA: 180 SX PERMAFROST 'C`, 80 BBLS ARCTIC PACK EST TOC 2450' ~- 9 5/8', 36~, K-55, BTRC, SET ®6405' CEMENT DATA: 801 86LS,171S SK$ PERMAFROST "E` W/ 5 ~/SK GILSONITE. 58 88LS, 275 SKS CLASS 'G' CMT W/ 3% NoCL, 1z cFR-2. ECP 10,456' ECP 10,517' ::::: PBTD 10,833' "r ~:' TD 10,931 7", 29#, L-80, BTRC SET ®10908' CEMENT DATA: 7$ BBLS, 330 SKS CLASS `G' CMT W/ 1% CFR-2, .37. i-iALAD 24. CONOCO INC. ~ APPROVED 3Y: 1JS D:,TF: ' /13/93 ~~~/ AtiCNORAGE ~I\±SIOti D1?l,=itD 3`:': j.;~: r'C"p C~+.i =1~.~. '~CA311r ~ - i OPERABLE: MPB-18 (PTD #2290) to place on Injection for UIC I~IA Page 1 of 1 Regg, James B (DOA) From: NSU, ADW Well Integrity Engineer [NSUADWWeIIlntegrityEngineer@BP.com] Sent: Sunday, February 22, 2009 8:16 PM ' "~"~~~ ~~I ~~v, To: Regg, James B (DOA); Maunder, Thomas E (DOA); MPU, Well Operations Supervisor; MPU, Wells Ops Coord; MPU, Production Optimization Engineer; MPU, Wells Ops Coord2; MPU, Area Manager; NSU, ADW Well Operations Supervisor; Engel, Harry R; Rossberg, R Steven Cc: Townsend, S. Eliot; Rupert, C. Ryan; NSU, ADW Well Integrity Engineer; MPU, OMS Field Coordinator; MPU, OMS Facility Coordinator Subject: OPERABLE: MPB-18 (PTD #1852290) to place on Injection for UIC MITIA Attachments: MIT MPU B-18 02-21-09.x1s All, MPB-18 (PTD#1852290) has passed an AOGCC witnessed MITIA for UIC compliance. The MITIA form is attached. The well has been reclassified as Operable. Please let us know if you have any questions. «MIT MPU B-18 02-21-09.x1s» Thank you, Anna ~Du6e, ~? E. Well Integrity Coordinator GPB Wells Group Phone: (907) 659-5102 Pager: (907) 659-5100 x1154 From: NSU, ADW Well Integrity Engineer Sent: Sunday, February 15, 2009 8:35 PM To: 'Regg, lames B (DOA)'; 'Maunder, Thomas E (DOA)'; MPU, Well Operations Supervisor; MPU, Wells Ops Coord; MPU, Production Optimization Engineer; MPU, Wells Ops Coord2; MPU, Area Manager; NSU, ADW Well Operations Supervisor; Engel, Harry R; Rossberg, R Steven Cc: Holt, Ryan P (ASRC); NSU, ADW Well Integrity Engineer; Rupert, C. Ryan Subject: UNDER EVALUATION: MPB-18 (PTD #1852290) to place on Injection for UIC MITIA AI I, MPB-18 (PTD #1852290) has been reclassified as Under Evaluation so that the well may be placed on injection, allowed to thermally stabilize, and an AOGCC witnessed MITIA to be conducted. At this time there are no indications of integrity concerns. The annulus pressures have been less than 250 psi since the well was shut-in 01 /11 /06. Please let me know if there are any questions. Thank you, Anna ~Du6e, ~P. E. Well Integrity Coordinator GPB Wells Group Phone: (907) 659-5102 Pager: (907) 659-5100 x1154 4/1/2009 MEMORANDUM • TO: Jim Regg P.I. Supervisor FROM: Bob Noble Petroleum Inspector State of Alaska Alaska Oil and Gas Conservation Commission DATE: Monday, March 02, 2009 SUBJECT: Mechanical Integrity Tests BP EXPLORATION (ALASKA) INC B-18 MILNE PT iJNIT KR B-18 Src: Inspector NON-CONFIDENTIAL Reviewed By: P.I. Suprv , i~(L Comm Well Name: MILNE PT UNIT KR B-18 Insp Num: mitRCN090225 1 327 1 1 Rel Insp Num: API Well Number: 50-029-21450-00-00 Permit Number 185-229-0 Inspector Name: Bob Noble Inspection Date• 2/21/2009 Packer Depth Pretest Initial 15 Min. 30 Min. 45 Min. 60 Min. Well B-18 ~ Type Inj. ~' "I TVD 68sa ~~ ~ IA sso zszo 2s2o 2szo p T Isszz9o TypeTest SPT Test psi zszo ~ ~ OA o 0 0 0 Interval aYRTST p~F P Tubing zzoo zzoo zzoo j zzoo Notes: Monday, March 02, 2009 Page 1 of 1 ( ( MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission TO: Jim Regg %11 1/'6)04 DATE: January 8,2004 P. I. Supervisor SUBJECT: Mechanical Integrity Tests FROM: Jeff Jones 8P{XA Petroleum Inspector 8, J Pads 8-12,8-18, J-11, J-15 MPU Milne Point Field NON- CONFIDENTIAL 4 P 4 P 4 P 4 P Type Test Interval M= Annulus Monitoring 1= Initial Test P= Standard Pressure Test 4= Four Year Cycle R= Internal Radioactive Tracer Survey V= Required by Variance A= Temperature Anomaly Survey W= Test during Workover D= Differential Temperature Test 0= Other (describe in notes) Test's Details January 8, 2004: I traveled to BPXA's Milne Point Field wells B-12, B-18, 1-11 and 1-15 to witness MIT's. Lee Hulme was the BPXA representative for the tests today. The pretest pressures on each well were monitored and found to be stable. and the standard annulus pressure tests were then perfonned with each well passing the MIT. Four well houses were inspected with no exceptions noted. Summary: I witnessed successful MITis on BPXA's Milne Point Field wells B-12, B-18, J-ll and 1-15. Four well house inspections conducted, no exceptions noted. M.I.T.'s performed: ~ Number of Failures: .Q Total Time during tests: 6 hrs Attachments: cc: ð)tA.~¡~E[1 JA~~ 7~ ~ 200~, MIT report form 5/12/00 L.G. MIT MPU 8-12,8-18, J-11, J-151-8-04 JJ.xls 1/15f2004 ( ( STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION Mechanical Integrity Test ...r-. Email to: Winton_Aubert@admin.state.ak.us; Bob_Fleckenstein@admin.state.ak.us; Jim_Regg@admin.state.ak.us ~ lþ(d~ OPERATOR: FIELD I UNIT I PAD: DATE: OPERATOR REP: AOGCC REP: BP Exploration - Alaska Milne Point Unit / B-pad & J-pad 01/08/04 Packer Depth Pretest Initial 15 Min. 30 Min. Well B-12 Type Inj. P TVD 6,998' Tubing 2,140 2,140 2,140 2,140 Interval 09:38 P.T.D. 1850800 Type test P Test psi 1,750 Casing 550 1,800 1,760 1,750 P/F Pass Notes: 1 bbls diesel to 1800 OA 650 750 750 750 Bled back to 500 Well B-18 Type Inj. P TVD 6,854' Tubing 2,550 2,550 2,550 2,550 Interval 10:40 P.T.D. 1852290 Type test P Test psi 1,714 Casing 500 2,200 2,180 2,170 P/F Pass Notes: 2 bbls diesel to 2200 OA 300 480 480 480 Bled back to 500 Well J-11 Type Inj. P TVD 3,913' Tubing 1,920 1,920 1,920 1,920 Interval 13:45 P.T.D. 1941140 Type test P Test psi 1,500 Casing 740 2,600 2,550 2,550 P/F Pass Notes: 1.2 bbls diesel to 2600 OA 650 750 750 750 Bled back to 500 Well J-15 Type Ini. P TVD 3,839' Tubing 1,180 1,180 1,180 1,180 Interval 12:45 P.T.D. 1991070 Type test P Test psi 1,500 Casing 500 2,025 1,980 1,950 P/F '. Pass Notes: .7 bbls diesel to 2025 OA 650 750 750 750 Bled back to 500 Well Type Ini. TVD Tubing Interval P.T.D. Type test Test psi Casing P/F Notes: Test Details: TYPE INJ Codes F = Fresh Water Inj G = Gas Inj S = Salt Water Inj N = Not Injecting TYPE TEST Codes M = Annulus Monitoring P = Standard Pressure Test R = Internal Radioactive Tracer SuNey A = Temperature Anomaly SuNey D = Differential Temperature Test INTERVAL Codes I = Initial Test 4 = Four Year Cycle V = Required by Variance T = Test during Workover a = Other (describe in notes) ~ ~ ~~'E'~"" JAN <'~ JJ 2 OO~ ~"""" /, . -", . il!' ~ tJ>~#~ " [) - -~ j~ .~) MIT Report Form Revised: 06/19/02 2004-01 08_MIT _MPU_J-15.xls NOTES: 1. ALL MEASUREMENTS ARE FROM KDB OF NABORS RIG NO. 27E KDB - SL = 59' KDB - GL = 35' MAX. ANGLE = 56° @ 4700' K.O.P. = 650' SLANT HOLE:' YES MIN. ANGLE = 51.5' AT 9900' TREE TYPE: FMC 5 1/8" APl 5000# WITH 3 1/2" 8 RD. TREETOP CONNECTION. MIN. RESTRICTION IS CAMCO 'D' NIPPLE AT 10,4,34' (2.75" ID) COMPLETION FLUID: 10.2 PPG NoCI-NaBr BRINE AND DIESEL . 3. 4. 5. 6. PERFORATIONS: 12 SPF AT 120' PHASING, 5" GUNS MK-1, MK-2 10,.314'-10,581' MD 6957'-6998' TVD LK-1 10,674'-10,703' MD 7175'-7192' TVD (BASED ON DIL LOG OF 9-30-85) CONOCO INC. ANCHORAGE DIVISION WELL No. COMPLETION MILNE POINT B-18 SKETCH UNIT (I) APl No.: 50-029-21450 PERMIT No.: 85-229 COMPLETED: 10/5/85 LAST WORKOVER: N/A --FMC TUBING HANGER W/ 3 1/2" 'H' BPV PROFILE ~3 1/2", 9.2# L-80 BUTTRESS TUBING (2.992" I.D., 2.867" DRIFT) 1892' CAMCO TRDP-IA-SSA SCSSV (2.812" ID) 10,127' BOT PBR, SEAL ASSEMBLY (5.00" ID) 10,146' BOT 'NB' RETRIEVABLE PACKER (2.89" ID) 10,185' CAMCO 'W-I' SELECTIVE NIPPLE (2.81.3" ID) 10,217' CAMCO 'MMG-2' GAS LIFT MANDREL 2.90" ID, 1.5" VALVES 10,260' CAMCO 'MMG-2' GAS LIFT MANDREL 2.90" ID, 1.5" VALVES ~10,301' BLAST JOINTS (78.41' TOTAL LENGTH, 4.5" OD, 5.0" ID) 10,408' BROWN 'CL' LOCATOR SEAL ASSEMBLY 10,413' BROWN '2B' PERMANENT PACKER & SEAL BORE EXT. (5.875" OD, 4.0" ID) & MILLOUT EXT. (5.0" OD, 4.408" ID) 10,434' CAMCO 'D' NIPPLE (2.75" ID) W/ PLUG 10,441' TUBING TAIL 10,760' TAG FILL ,.3/1/87, E-LINE 10,831' PBTD (WlRELINE MEAS.) 10,908' 7", 29 LB/FT L-80 BTRS CSG (6.184" ID, 6.059" DRIFT) APPROVED BY: JHA/HDS DATE: 03/26/92 DRAFTED BY: SJN CAD FILE: WCOB18 ., :-'- STATE OF ALASKA ~-- · - ALAS, OIL AND GAS CONSERVATION COME lION ~.~ APPLICATION FOR SUNDRY APPROVALS 1. Type of Request: Abandon__ Suspend Operation shutdown Alter casing __ Repair well __ Plugging_ Time extention Stimulate__ Change approved program Pull tubing Variance x Perforate Other 2. Name of Operator 5. Type of Well: 6. Datum elevation (DF or KB) Conoco Inc. Development 59' KDB feet 3. Address Exploratory 7. Unit or Property name 3201 C Street, Suite 200 Anchorage, AK 99503 Stratigraphic__ Milne Point Unit Serxice x 4. Location of well at surface 8. Well number 813' FSL, 702' FWL, Sec. 18, T13N, R11E, U.M. B-18 At top of productive interval 9. Permit number 1524' FSL, 866' FEL, Sec. 14, T13N, R10E, U.M. 85-229 At effective depth 10. APl number 1546' FSL, 1280' FEL, Sec. 14, T13N, R10E, U.M. 50-029-21450 At total depth 11. Field/Pool 1552' FNL, 1360' FEL, Sec. 14, T13N, R10E, U.M. Kuparuk River Field 12. Present well condition summary Total depth: measured 10931' feet Plugs (measured) 10434' D Nipple true vertical 7326' feet Effective depth: measured 10831' feet Junk (measured) true vertical 7266' feet Casing Length Size Cemented Measured depth True vertical depth Structural Conductor 80' 13-3/8" To Surface 115' 115' Surface 6372' 9-5/8" 56 bbl Class G 6407' 4638' Intermediate 601 bbl Permf E Production 7618' 7" 330 SX Class G 10908' 7312' uner Perforation Depth: measured 10317'-10381'; 10674' - 10703' true vertical 6957' - 6998'; 7175' - 7192' NOV ?- 6 1991 (size, grade, and measured depth) 3-1/2" 9.3#/ft, L-80, 10127, 0}[ & GaS CONS, (;0t~lS=t{)O'" Tubing Packers and SSSV (type and measured depth) CAMCO TRDP-1A SCSSV @1892';BOT HB Pkr @101z~§, 2B Pkr @10413' 13. Attachments Description summaryof proposal X Detailed operations program__ BOP sketch __ 14. Estimated date for commencing operation 15. Status of well classification as: N/A 16. If proposal was verbally approved Oil Gas __ Suspended Name of approver Date approved Service Waterflood Injector 17. I hereby cel~ifythat tl~! foregoing is true and correct to the best of my knowledge. Signed i~)]~ /tN~ J.H. Andrew Title Production Engineer Date Nov 19, 1991 FOR COMMISSION USE ONLY Conditions OfPlugapproval:integrity__Notify CommissiOnBoP Test so representatiVeLocationmay witnessclearance I Approval No. -- , Mechanical Integrity Test ~ Subsequent form required 10- ORIGINAL SIGNED BY Form 10-403 Rev 06/15/88 SUBMIT IN TRIPLICATE Milne Point Unit B-18 Well The MPU B-18 well is an active water injection well. Pressure on the 3-1/2" x 7" production tubing-casing annulus is currently 2500 psig. This is in excess of the 500 psig maximum pressure guideline established by the Commission for continuous operation of injection wells. Conoco requests a variance to allow injection to continue while diagnostic work is performed. This work is necessary to determine the exact source of pressure communication in the water injection wells. Multiple attempts have been made to control the annulus pressure in the B-18 well by bleeding it off. The pressure can be bled to 500 psig in 10 minutes with less than 3 barrels of fluid extracted. However, annular pressure returns to previous levels within a few days. There has been no apparent improvement in either the build rate or final build-up pressure. The wellhead has also been tested. All seals were determined to be holding. This indicates the source of the pressure is downhole mechanical communication rather than thermal or ballooning effects. Three B-Pad water injectors have been worked over within the past four months to resolve similar annular pressure problems. New tubing strings were run in all three wells to eliminate the possibility of leaks due to corrosion and to replace the buttress thread connections with 8rd threads. New packer/seal assemblies were also run in two wells to ensure any leaking production seals would be isolated. Workovers in two wells, MPU B-14 and MPU B-17, were successful. Annular pressure has re-appeared in the third well, MPU B-12. It is not known why workovers were successful in the B-14 and B-17 wells, and not in the B-12 well. It is recommended that remedial work to resolve annular pressure in this well be deferred until the exact source of the communication in the B-12 well is determined. Our current plan is to run additional logs the B-12 well to isolate the leak. This information should enable us to design a workover program to successfully eliminate annular pressure in this well the first time rather than by trial and error. Additional testing is being planned in the interim period to reconfirm annular fluids are not in communication with uncased hole. We will continue to keep the Commission informed of the results of all testing. Tom Painter Division Manager Conoco lnc. 3201C Street Suite 200 Anchorage, AK 99503 ,? December 23, 1986 Mr. Chatterton, Chairman Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99503 Dear Mr. Chatterton: Temporary Shut-in of Production and Injection Wells Within the Milne Point Unit As you are aware, Conoco et al. has filed an application with the Department of Natural Resources to temporarily discontinue production operations at Milne Point. The attached sundry notices are intended to serve as notice of the pending temporary shut-in of all wells located within the Milne Point Unit. There are 19 active and 5 inactive production wells at Milne Point. AC%iVE: B-3, B-4A, B-6, B-9, B-10, B-il, 5-13, ~-15, ~-16, C-l, C-2, C-3, C-4, C-5A, C-7, C-9, C-i3, C-i4, C-i6 STATIC: B-20, B-21, B-22 C-17, ¢-18 Ail active production wells will be freeze protected by displacing the top 3000' of the tubing with a 1:3 diesel:oil mixture, ihe annular fluid levels will be monitored for leaking gas !i~t valves, if necessary the production casing annulus will be displaced with a diesel:oil m~--xture to at least 3000'. Once the shut-down operation is completed, pressure surveys will be run in all production wells. After the surveys are run BPVs will be installed and all SCSSVs and wellhead valves will be closed. The inactive production wells have been adequately freeze protected with diesel across the permafrost. There are currently ten active and six inactive water injection wells in the Milne Point Unit. D ~'~-': '~ ACTIVE: B-8, B-12, B-14, B'17, B-18 C-8, C-ii, C-12, C-15 CFP-2 STATIC: B-5A, B-7, B-19 C-6, C-10, C-19 .Active water injection wells will be freeze protected by displacing the tubing to at least 2000' with a 50:50 water:methanol mix. The SCSSV and wellhead valves will remain open for two to three weeks after the well is shut-in to monitor wellhead pressure. When adequate wellhead data has been obtained the BPVs will be set and the SCSSVs and all wellhead valves will be closed. The static injection wells are currently freeze protected and no additional work will be required. Injection water is supplied by three water source wells. Though only one well is active at any given time, all wells are capable of produc- ing. A-2A; B-l; CFP-1 Water source wells will be freeze protected by displacing the tubing to at least 2000' with a 2:1 propylene glycol:water mixture. After the wells have been displaced with the glycol:water the BPVs will be set and all wellhead valves will be closed. The E-2 gas storage well has been shut-in since July 1986 due to a tubing leak. The wellbore is filled with natural gas so that freezing is not a concern, but to prevent potential corrosion an inhibitor will be displaced into the well. A 50:50 methanol:water mix will be used to carry the inhibitor. if you have any ~uestions on the shutdo~ procedure please contact Don Girdler at 564-7637. Yours very truly, ~ ~f~< Painter <C~(sion Manager ~/~? STATE OF ALASKA .... ~. ALASt. OIL AND GAS CONSERVATION COMM._SION APPLICATION FOR SUNDRY APPROVALS 1. Type of Request: Abandon [] Suspend [] Operation Shutdown Re-enter suspended well [] Alter casing [] Time extension [] Change approved program [] Plugging [] Stimulate [] Pull tubing [] Amend order [] Perforate [] Other 2. Name of Operator 5. Datum elevation (DF or KB) Conoco Inc. 59' KB feet 3. Add~e~1 C Street, Ste. 200 Anchorage, Alaska 99503 6. Uni[.Qr~Prop~rty n.a~.e ._ , FtlAne rolnc un~c 4. Location of well at surface 813' FSL, 702' FWL, Sec. At top of productive interval 1523 FSL, 867' FEL, Sec. At effective depth N/A At t~t.,~.~l~pt~sL, 1361' FEL, Sec, 18, T13N, RilE, U.M. 14, T13N, R10E, U.M. 14, T13N, R10E, U.M. 7. Well number ~'~ 8. Permit number 85-229 9. APl number 50-- 029-21450 10..POO~uparuk River 11. Present well condition summary Total depth: measured true vertical 10931 feet 7326 feet Plugs (measured) Effective depth: measured true vertical N/A feet feet Junk (measured) Casing Structural Conductor Surface Intermediate Production Liner Perforation depth: Length Size Cemented 80' 16" To Surface 6371' 9 5/8" 2020 Sxs 10874' 7" 330 Sxs measured true vertical 10314'-10381'; 10674'-10703' 6957'-6998'; 7175'-7192' 3~" L-80 10441' Tubing(size, grade and measured depth) a , , Measured depth True Vertical depth 115' 6407' 115' 4638' 10908' 7312' Packers and SSSV (type and measured~&p~h) SCSSV @ 1892'; Ret. Pkr. @ 10146'; Perm. Pkr. @10413' 12.Attachments Description summary of proposal,l~ Detailed operations program [] BOP sketch [] 13. Estimated date for commencing operation January 1987 14. If proposal was verbally approved Name of approver Date approved 15. I hereb/y-csrtify that the foregoing is true and correct to the best of my knowledge Signed ~==~,,-..-b~,.~...~_~ Title St, Prodl_,ctien E_ngineer Commission Use Only Date Conditions of approval Notify commission so representative may witness I Approval No. [] Plug integrity [] BOP Test [] Location clearancel ~ d --11 Approved by t:)RIG;N~,L SIGNEi~ Commissioner by order of the commission Date /' Submi{ in tri/plicate Form 10-403 Rev 12-1-85 Conoco Inc. 3201 C Street Suite 200 Anchorage, AK 99503 (907) 564-7600 August 27, 1986 State of Alaska Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Gentlemen: Attached are daily drilling recaps for MPU wells B-5A, B-8, B-12, B-14, B-18, B-19, B-21, C-10, C-II, C-12, C-18. Completion reports were submitted by our letter of August 18, 1986. If you should have any questions please call Charles Taylor at 564-7606. Yours very truly, E. D. Wilson Division Administrative Manager CLT/vv Well File RECEIVED AUG 2 8 1986 Aladm 011 & Gas Cons. Commi,~$1or~ Anchorage Kuparuk River Field - North Slope Borough, Alaska W.I. - 53.33555% Milne Pt. B No. 18 (I) CONFIDENTIAL AFE 10-61-1140 AP1 No. 029-21450 Permit: 85-229 Elevation: 59' KB Location: 813' FSL, 702' FWL, Sec. 18, T13N, RilE, U.M. Objective: 10,'765' - Kuparuk River 9-17: RIH & tag bottom @'115'; drlg. f/l15' to 937'. RIG ACCEPTED 0900 HRS. Mud Wt. 9.3 Viscosity: 95 Cum. Mud Cost: $ · . Nabors 27-E (0-1-0) Drilling Foreman: Brady Weather: Temp. 28° Wind: SW 24 knots Visibility: 25 miles Kuparuk River Field - North Slope Borough, Alaska W.I. - 53.33555% Milne Pt. B No. 18 (I) CONFIDENTIAL AFE 10-61-1140 AP1 No. 029-21450 Permit: 85-229 Elevation: 59''KB Location: 813' FSL, 702' FWL, Sec. 18, T13N, RilE, U.M. Objective: 10,765' - Kuparuk River Drlg. f/937' to 1631'; angle building 3.3°/100'. Mud Wt. 9.3 Viscosity: 71 Nabors 27-E (0-2-0) Weather: Temp. 23° Wind: SW 8 knots Kuparuk River Field - North Slope Borough, Alaska W.I. - 53.33555% Milne Pt. B No. 18 (I) CONFIDENTIAL AFE 10-61-1140 AP1 No. 029-21450 Permit: 85-229 Elevation: 59' KB Location: 813' FSL, 702' FWL, Sec. 18, T13N, RilE, U.M. Objective: 10,765' - Kuparuk River 9-19: Drlg. f/1631' to 3300'. Mud Wt. 9.7 Viscosity: 85 Cum. Mud Cost: $ Nabors 27-E (0-3-0) Weather: Temp. 28° Wind: W 3 knots Visibility: 3/8 mile Cum. Mud Cost: $ Drilling Foreman: Brad~ Visibility: 15 miles Drilling Foreman: Mount joy Kuparuk River Field - North Slope Borough, Alaska W.I. - 53.33555% Milne Pt. B No. 18 (I) CONFIDENTIAL AFE 10-61-1140 AP1 No. 029-21450 Permit: 85-229 Elevation: 59' KB Location: 813' ~SL, 702' FWL, Sec. 18, T13N, RilE, U.M. Objective: 10,765' - Kuparuk River 9-20: Drlg. f/3300' to 4980'. Mud Wt. 9.7 Viscosity: 70 Cum. Mud Cost: $ - Nabors 27-E (0-4-0) Drilling Foreman: MountjoM Weather: Temp. 23°/-11° Wind:SW 15 knots Visibility: 7 miles Kuparuk River Field - No{th Slope Borough, Alaska W.I. - 53.33555% Milne Pt. B No. 18 (I) CONFIDENTIAL AFE 10-61-1140 API No. 029-21450 Permit: 85-229 Elevation: 59' KB Location: 813' FSL, 702' FWL, Sec. 18, T13N, RllE, U.M. Objective: 10,765' - Kuparuk River 9-2i: Drlg. f/4980' to 6185. 9-22: Drlg. f/6185' to 6393. 9-23: Drlg. f/6393' to 6435. Ran 157 jts. of 9-5/8" 36# L-55 BTRC csg. Shoe @ 6407', FC @ 6324'. Mud Wt. 10.2 Viscosity: 63 Cum. Mud Cost: Nabors 27-E (0-7-0) Drilling Foreman: Mountjoy Weather: Temp. 26°/21° Wind:SW 4 knots Visibility: 15 miles Kuparuk River FielQ North Slope Borough, Alaska ,.I. - 53.33555% Milne Pt. B No. 18 (I) CONFIDENTIAL AFE 10-61-1140 AP1 No. 029-21450 Permit: 85-229 Elevation: 59' KB Location: 813' FSL, 702' FWL, Sec. 18, T13N, RilE, U.M. Objective: 10,765' - Kuparuk River 9-24: Circ. & recip, pipe w/full returns. Pump 40 bbls. of 11 ppg zeogel & 20 bbls. water. Pumped 1715 sks. of 12.3 ppg Permafrost "E" w/5#/sk gilsonite & 275 sks. Class "G" w/3% NaC1 & 1% CFR-2, displaced w/490 bbls. 10.2 ppg mud. RU & pumped 30 sks. of 12.3 ppg Permafrost "E" w/5#/sk gilsonite for top job. Mud Wt. 9.5 Viscosity: 40 Nabors 27-E (0-8-0) Weather: Temp. 27°/14° Wind:NW 8 knots Kuparuk River Field - North Slope Borough, Alaska Milne Pt. B No. 18 (I) CONFIDENTIAL API No. 029-21450 Permit: 85-229 Cum. Mud Cost: Si Drilling Foreman: Mount~oy Visibility: 1½ miles W.I. - 53.33555% AFE 10-61-1140 Elevation: 59' KB Location: 813' FSL, 702' FWL, Sec. 18, T13N, RllE, U.M. Objective: 10,765' - Kuparuk River 9-25: Cleaned out to 6435'. Drlg. f/6435' to 7930'. Mud Wt. 9.6 Viscosity: 44 Nabors 27-E (0-9-0) Weather: Temp. 30°/22° Wind: S 4 knots Kuparuk River Field - North Slope Borough, Alaska Milne Pt. B No. 18 (I) CONFIDENTIAL API No. 029-21450 Permit: 85-229 Cum. Mud Cost: $7 Drilling Foreman: Mountjoy Visibility: 15 miles W.I. - 53.33555% AFE 10-61-1140 Elevation: 59' KB Location: 813' FSL, 702' FWL, Sec. 18, T13N, RILE, U.M. Objective: 10,765' - Kuparuk River 9-26: Drlg. f/7930' to 9425'. Mud Wt. 9.7+ Viscosity: 43 Nabors 27-E (0-10-0) Weather: Temp. 20°/7° Wind: SW 8 knots Kuparuk River Field - North Slope Borough, Alaska Milne Pt. B No. 18 (I) CONFIDENTIAL AP1 No. 029-21450 Permit: 85-229 Cum. Mud Cost: $ Drilling Foreman: MountjoX Visibility: 15 miles W.I. - 53.33555% AFE 10-61-1140 Elevation: 59' KB Location: 813' FSL, 702'-FWL, Sec. 18, T13N, RilE, U.M. Objective: 10,765' - Kuparuk River 9-27: Drlg. f/9,425' to 10,100'. Mud Wt. 10.2 Viscosity: 45 Nabors 27-E (0-11-0) Weather: Temp. 23° Wind: calm Kuparuk River Field - North Slope Borough, Alaska Milne Pt. B No. 18 (I) CONFIDENTIAL AP1 No. 029-21450 Permit: 85-229 Cum. Mud Cost: $ Drilling Foreman: Mountjoy Visibility: 15 miles W.I. - 53.33555% AFE 10-61-1140 Elevation: 59' KB Location: 813' FSL, 702' FWL, Sec. 18, T13N, RilE, U.M. Objective: 10,765' - Kuparuk River 9-28: Drlg. f/10,100' to 10,435'. ~' Mud Wt. 10.4 Viscosity: 47 Cum. Mud Cost: $~ Nabors 27-E (0-12-0) Drilling Foreman: Mountjo__y_v Weather: Temp. 29° Wind: E 20 knots Visibility: 15 miles 9-29: Drlg. f/10,435' to 10,892'. Circ. Mud Wt. 10.5 Viscosity: 52 Nabors 27-E (0-13-0) Weather: Temp. 35° Wind: W 8 knots Cum. Mud Cost: $ Drilling Foreman: Mount~oy Visibility: 15 miles 9-30: POOH f/10,892. RIH to log; hit bridge 7785'; POOH. RIH to 10,892'. Circ. & cond. hole. Mud Wt. 10.5 Viscosity: 54 Cum. Mud Cost: $ Nabors 27-E (0-14-0) Drilling Foreman: Mount~oy Weather: Temp. 22° Wind: ENE 10 knots Visibility: 5 miles Kuparuk River Field ~orth Slope Borough, Alaska ...I. - 53.3~5%~ Milne Pt. B No. 18 (I) CONFIDENTIAL AFE 10-61-i140 AP1 No. 029-21450 Permit: 85-229 Elevation: 59' KB Location: 813' FSL, 702' FWL, Sec. 18, T13N, RilE, U.M. Objective: 10,765' - Kuparuk River 10-1: Ran DIL-CDL-CNS-GR f/10,872' to 9595'. Drlg. f/10,892' to 10,931'. Mud Wt. 10.4 Viscosity: 45 Cum. Mud Cost: $ ' Nabors 27-E (0-15-0) Weather: Temp. 29° Wind: ENE 10 knots Kuparuk River Field - North Slope Borough, Alaska Milne Pt. B No. 18 (I) CONFIDENTIAL AP1 No. 029-21450 Permit: 85-229 Drilling Foreman: Mountjoy Visibility: 5 miles W.I. - 53.33555% AFE 10-61-1140 Elevation: 59' KB Location: 813' FSL, 702' FWL, Sec. 18, T13N, RllE, U.M. Objective: 10,765' - Kuparuk River 10-2: Ran 159 jts. of 7" 29# b~-80 Butt. csg. FS @ 10,908'; FC @ 10,831'. Pumped 40 bbls. 12 ppg. sepiolite & 330 sks. Class G w/l% CFR-2 & 0.3% Halad-24 @ 6 BPM; displaced w/401 bbls. of 10.2 ppg. NaBr @ 6 BPM. Mud Wt. Viscosity: Cum. Mud Cost: $ Nabors 27-E (0-16-0) Weather: Temp. 25° Wind: ENE 8 knots Kuparuk River~F~ei~---~rth Slo--pe Borough, Alaska Milne Pt. B No. 18 (I) CONFIDENTIAL AP1 No. 029-21450 Permit: 85-229 Drilling Foreman: Mountjoy Visibility: 7 miles AFE 10-61-1140 Elevation: 59' KB Location: 813' FSL, 702' FWL, Sec. 18, T13N, RILE, U.M. Objective: 10,765' - Kuparuk River 10-3: Run GR f/10,833' to 9300'. RU & RIH w/20' perf gun, 5", 12 SPF & shoot f/10,683' to 10,703'. RIH w/select fire gun & shoot 10,674' to 10,683' & 10,386' to 10,374'. RU & RIH w/20' gun & shoot f/10,354' to 10,374'. RU & RIH w/20' gun & shoot f/10,334' to 10,354'. RU & RIH w/20' gun & shoot f/10,314' to 10,354'. Mud Wt. 10.2 Nabors 27-E (0-17-0) Weather: Temp. 26° Viscosity:~ Wind: E 10 knots Kuparuk River Field - North Slope Borough, Alaska Milne Pt. B No. 18 (I) CONFIDENTIAL AP1 No. 029-21450 Permit: 85-229 Cum. Mud Cost: $ ~ Drillin~ Foreman: Brady. Visibility: 12 miles W.I. - 53.33555% AFE 10-61-1140 Elevation: 59' KB Location: 813' FSL, 702' FWL, Sec. 18, T13N, RilE, U.M. Objective: 10,765' - Kuparuk River 10-4: Run 266 its. of 3½" 9.2 #/ft. tbg. w/2 MMG GLMs. Mud Wt. 10.2 Viscosity: Nabors 27-E (0-18-0) Weather: Temp. Wind: Kuparuk River Field - North Slope Borough, Alaska Milne Pt. B No. 18 (I) CONFIDENTIAL API No. 029-21450 Permit: 85-229 Cum. Mud Cost: $ ~ Drilling Foreman: B~ady Visibility: W.I. - 53.33555% AFE 10-61-1140 Elevation: 59' KB Location: 813' FSL, 702' FWL, Sec. 18, T13N, RllE, U.M. Objective: 10,765' - Kuparuk River 10-5: Pkr. @ 10,146', SCSSV @ 1892'. Displace brine w/100 bbls. diesel, 20 bbls. on backside. Install BPV, SCSSV closed w/ll00 psi. under valve. RIG RELEASED @ 2200 hrs. on 10-4-85. Mud Wt. 10.2 Viscosity: Cum. Mud Cost: $ Nabors 27-E (0-19-0) Drilling Foreman: Brady Weather: Temp. 23 Wind: SE 5 knots Visibility: 30 STATE OF ALASKA ~ ALASKa, .~IL AND GAS CONSERVATION C,.,MMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1. Status of Well Classification of Service Well OIL [] GAS [] SUSPENDED [] ABANDONED [] SERVICE [~ 2. Name of Operator 7. Permit Number Conoco Inc. 85-229 3. Address 8. APl Number 3201 C Street, Ste., 200, Anchorage, Alaska 99503 50-029-21450 4. Location of well at surface 9. Unit or Lease Name 813' FSL, 702' FWL, Sec. 18, T13N, RllE, u.M. Milne Point Unit At Top Producing Interval 10. Well Number 1523' FSL, 867' FEL, Sec. 14, T13N, R10E, U.M. B-18 At Total Depth 11. Field and Pool 1552' FSL, 1361' FEL, Sec. 14, T13N, R10E, U.M. 5. Elevation in feet (indicate KB, DF, etc.) I 6. Lease Designation and Serial No. Kuparuk River Field 59' KBI ADL 47438 12. Date Spudded 13. DateT.D. Reached 14. Date Comp.,Susp. orAband. I 15. Water Depth, if offshore 116'No. of Completions 9-17-85 10-1-85 10-4-85I N/A feet MSLI 1 17. Total Depth (MD+TVD) 18.Plug Back Depth (MD+TVD) 19. Directional Survey I 20. Depth where SSSV set 21. Thickness of Permafrost 10931' MD(7326'TV]_)) 10833'MD(726' TfM~s~K NO[]I 1892 feetMD 1800'_+ 22. Type Electric or Other Logs Run DIL-CDL-CNS-GR 23. CASING, LINER AND CEMENTING RECORD SETTING DEPTH MD CASING SIZE'WT. PER FT. GRADE iTOP BOTTOM HOLESIZE CEMENTING RECORD AMOUNT PULLED 9 5/8" 36# K-55 O- 6407' 12¼" 1715 sks Permafrost 275 sks Class G & 3() sks Perm E top j 7" 29# L-80 0 10908' 8~" 330 sks Class G 24. Perforations open to Production (MD+TVD of Top and Bottom and 25. TUBING RECORD interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD) M. Kup 10,314'-10,381' MD 3~, 9.2#L-8¢ 10,441' MD 10,146' MD (6,957'-6,998' TVD) Buttress 10,413' MD L. Kup 10,674'-10,703' MD 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. (7,175'--7,192' TVD) DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED All shots - 5" casing guns, 12 SPF, 120° phasing . 27. PRODUCTION TEST Date FirSt Production I Method of Operation (Flowing, gas lift, etc.) I Date of Test Hours Tested PRODUCTION FOR OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE IGAS-OILRATIO TEST PERIOD ~ I Flow Tubing Casing Pressure CALCULATED OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-APl (corr) Press. 24-HOUR RATE ~ 28. CDR E DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips. ,VI... Alnsk20iJ & C~:r~ COilS. Commissior, ~b Form 10-407 Submit in duplicate Rev. 7-1-80 CONTINUED ON REVERSE SIDE 29. ' 30· " GEOLOGIC MARKERS ..... ' F~RMATION TESTS ... : NAME Include interval tested, pressure data, all fluids recovered and gravity, MEAS. DEPTH TRUE VERT. DEPTH GOR, and time of each phase. KA 5,136' 3,884' MA 5,552' 4,124' NA 5,930' 4,246' OA 6,126' 4,464' M. Kuparuk 10,314' 6,957' L. Kuparuk 10,674' 7,175' 31. LIST OF ATTACHMENTS 32. I hereby certify that the foregoing is true and correct to the best of my knowledge ~: Signed ~""'"J~~ Title ~'/7~~' ~/~f/~---~ ?~ Date 0~::~/~ d:?(~ INSTRUCTIONS .General' This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Item 1' Classification of Service Wells' Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). Item 23: Attached supplemental records for- this well should show the details of any multiple stage cement- ing and the location of the cementing tool. Item 27: Method of Operation' Flowing, Gas Lift, Rod Pump,-Hydraulic Pump, Submersible, Water In- jection, Gas Injection, Shut-in, Other-explain. Item 28' If no cores taken, indicate "none". STATE OF ALASKA ALASKA,~'"LAND GAS CONSERVATION CI ~MISSION SUNDRY AND R =PORTS ON W.r= LS 1. DRILLING WELL [] COMPLETED WELL [] 2. Name of Operator 7. Permit No. Conoco ]:nc. 85-229 3. Address 8. APl Number 3201 C Street, Suite 200, Anchorage, Alaska 99503 5o- 029-21450 OTHER 4. Location of Well 813' FSL, 702' FWL, Sec 18, T13N, R11E, U.M. 5. Elevation in feet (indicate KB, DF, etc.) 59' KB Lease Designation and Serial No. ADL 47438 9. Unit or Lease Name Milne Point Unit. 10. Well Number B-18 1 1. Field and Pool Kuparuk River Fi eld 12. (Submit in Triplicate) Perforate [] Alter Casing [] Perforations Stimulate [] Abandon [] Stimulation Repair Well [] Change Plans [] Repairs Made Pull Tubing [] Other E~ Pulling Tubing (Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.) Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF: (Submit in Duplicate) [] Altering Casing [] Abandonment [] Other 13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any proposed work, for Abandonment see 20 AAC 25.105-170). Approval is requested to allow Milne Point Unit B-18 Well to utilize the high-low pressure pilots and safety system lines in'conjunCt]ion with the MPU B-8 Well.. This is necessary to operate surface and subsurface safety valves while temporarily producing B-18 RECEIVED .:., ] 1986 14. I hereby certify that the for_egoing is true and correct to the best of my knowled e. - --' P eJ~/f C mission Condqions of Approval, if any: By Order of Approved by COMMISSIONER the Commission Date ..... Form 10-403 Rev. 7-1-80 Submit "Intentions" ~n Triplicate and "Subsequent Reports" ,n Duplicate PERMANENT SAFETY SYSTEM INSTALL'ATION ?.' :,.:"!.~'?~, 1 ~ 198 AlasKa 0~I L~ 'L~:.:5 ~;,~r~S. C0al~iSS~0~ Flow Surface Safety Valve VELLHEAD SAFETY PANEL to SSV Hi -Lo Sensor Return Oil Pilot Re~urn Ges Pilot ~ · surface Safety VolvoJ ---- ,. ~~scSsv ~Block and I Drainto Cellar Hi- Lo Pilot II Gas Injection Line Hi-Lo Pilot TEMPORARY :, INSTALLATION r~l No TE : , S'urface Safety Regulator Valve 1. ~ I000 450O psi psi There are no additional valves in the flow or injection lines.' Flow Line JBleed Valves I I ~ Gas [ ~ ('~ Injection · ' 4500 psi Line ~-~'~LL I L~CATION IN S~.CTIOH FROU S. LIHc: FRC~'~ W. 464' 790' 769' 53:m' 979' ~l I,t r' ,::) L] i1 ,. -- ,., vv-- ,"--'- q¥ SCALE tN MIllES CONOCO 8 14 649' 300' 416' I10 ' a 814' B_-II ! 882' 1037' IOOB' 933' 091' c~73' 6,023 ,TT2.36 6 , 023,424.29 6 , 023,940.44 6 ,023,013.86 G ,023,939.01 G , 024,004.84 G,. o2~L. oSI.o3 971,864.47' 571,992.4P 9T~ ,052.77 :572 ~022.58 5T2,113.60 5T2,099.38 572,013.88 971,7T~.46 $?1,~61.74 G71.743.44. ?o° 2e' 29.0J9" fl. ro°2e' 3I.geI"N. 10028. 29.666'N. 149024' 41.146" W...] tO° 2e' 30.e3~'N. 14 9°24' 4~. 001" .W. ?O°2S' 27. 402"N. 70026' 28,948"N. r0°28' 23. 376"N. 7oe2e' 92.49e"N. 70029. 33. 12T"N. "7o'. zgL33.L,c~ ,. 149024, 46.1'0]" W. 149024, 42.954"W. 149°24' 39. 42 3"W. 149024'40.279 W. 14~24' 42.472"W. 149024, 49,280"W. 24'43. T23 "W. 24:So. 13o ~ 6.2,89 9.2, 89 J.B.S. J.B.S. 6.2, 89 I0.23,89 10. 23,89 10.23 10.23,B~ B.T. 39-8§ 10.12,69 L.O. 39 -99 II. 19,85 L.O. 39-09 J.B. 9. e, T, L.o. 21 21-85 39 39- 85 39 , · i · i i Ctn~tFICntE Or SUnVEYOn : q~c~SIEP~O a~D L~CE,SED 10 maCtrEE ~,., ~7.- -/ ,L~,f ~, ' ::"~ ~ "~ ~ T' ~ : '" '; ':': ~"] ' sur~v~tt~N A~O /Hal Att Di~ENS~O,~S ~?~ ~rnard T~muJic~ t I e PAD -- AS. BUILT WELL LOCATION CONOCO SCALI: : i SHCtT e i I" · 400' I 2 OP COMMENTS ~ 04MINSIUH IHt~. ~ ~R~ H. LINE ~EC T. e9 , .a~L ~MEflS ~NOM S, Lille 6 , 023,986.20 6 ,023,888.59 G ,023,655.07 STATE PLANE COORDS. GEODETIC POSITION IUDRTHINGS [ASTINGS L&TITUDE LONGITUDE Dr. TE C,tCKED r~lgCO BOOK , I~,LNE POINT UNIT j EXIITING OEVELOPM[NT sec. ,e II ~2 "':--'-'-__--__-- /1/ "'" iii N.A.D. 1921. I ll ~. OFFSETS TO SECTION LtN[S ARE COMPUTED lie SECTION COa~[ ~ POSITIONS. ~__ IlL 4~ L~A~O WITHIN " ' ALASKA-~?L ANDSTATE OF ALASKA ~--~ i~ C ~lV ~ D GAS CONSERVATION CL ,MISSI · WELL COMPLETION OR RECOMPLETION REPO 1. Status of Well Classification of Service Well Alaska 0il & Gas Cons. C0mmissi0, OIL [] GAS [] SUSPENDED [] ABANDONED I:-I SERVICE [] Anch0ra?. 2. Name of Operator 7, Permit Number Conoco Inc. 85-229 3. Address 8. APl Number 3201 C Street, Suite 200, Anchorage. Alaska 99503 50- 029-21450 4. Location of well at surface 9. Unit or Lease Name 813' FSL, 702' FWL, Sec. 18, T13N, RilE, U.M. Milne Point Unit At Top Producing Interval 10. Well Number 1523' FSL, 867' FEL, Sec. 14, T13N, RIOE, U.M. B-18 At Total Depth 11. Field and Pool 1552' FSL, 1361' FEL, Sec. 14, T13N, RiOE~ U.M. Kuparuk River Field 5. Elevation in feet (indicate KB, DF, etc.) ] 6. Lease Designation and Serial No. Kuparuk River 59' KB] ADL 47438 12. Date Spudded 13. Date T.D. Reached 14. Date Comp., Susp. or Aband. 15. Water Depth, if offshore 16. No. of Completions 9-17-85 10-1-85 10-4-85 N/A feet MSL 1 17. Total Depth (MD+TVD) 18. Plug Back Depth (MD+TVD) 19. Directional Survey 20. Depth where SSSV set 21. Thickness of Permafrost 10931'MD(7326'TVD)I 10833'MD(7268'TVF.)YES ~ NO [] 1892 feet MD 1800+ 22. Type Electric or Other Logs Run DIL-CDL-CNS-GR 23. CASING, LINER AND CEMENTING RECORD SETTING DEPTH MD CASING SIZE WT. PER FT. GRADE TOP BOTTOM HOLESIZE CEMENTING RECORD AMOUNT PULLED 9 5/8" 36# K-55 0 6407 12 ~" 1715 sks PermafrostE 275 sks Class G & 30 sks Perm E top jo 7" 29# L-80 0 10~908' 8~" 330 sks Class G 24. Perforations open to Production (MD+TVD of Top and Bottom and 25. TUBING RECORD interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD) Middle Kup-lO,314'-lO,381' MD 3~ 9.2#L-80 10,441'MD 10,14~' MD (6,957'-6,998' TVD) Buttress 10,413' MD Lower Kup-lO, 674'-10,703 ' MD 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. (7,175'-7,192' TVD) DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED All shots--5" casing guns, 12 SPF, 120'phasi:tg 27. PRODUCTION TEST Date First Production J Method of Operation (Flowing, gas lift, etc.) I Date of Test Hours Tested PRODUCTION FOR OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE IGAS-OILRATIO TEST PERIOD ~l~ Flow Tubing Casing Pressure CALCULATED ~ OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-APl (corr) Press. 24-HOUR RATE 28. CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips. Form 10-407 Submit in duplicate Rev. 7-1-80 CONTINUED ON REVERSE SIDE GEOLOGIC MARKERS FORMATION TESTS NAME Include interval tested, pressure data, all fluids recovered and gravity, MEAS. DEPTH TRUE VERT. D'EPTH GOR, and time of each phase. . KA 5,136' 3,884' MA 5,552' 4,124' NA 5,930' 4,246' 0A 6,126' 4,464' Middle Kuparuk 10,314' 6,957' Lower Kuparuk 10,674' 7,175' 31. LIST OF ATTACHMENTS 32. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed /~'~ I ~ Title ProductionEn~in~c,r Date 121~1~5 INSTRUCTIONS General' .This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Item 1' Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). · Item 23: Attached supplemental records for this well should show the details of any multiple stage cement- ing and the location of the cementing tool. Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In- jection, Gas Injection, Shut-in, Other-explain. Item 28' If no cores taken, indicate "none" Conoco Inc. 3201 C Street Suite 200 Anchorage, AK 99503 November 15, 1985 State of Alaska Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501 Gentlemen: Monthly Report of Drilling and Workover Operations Attached for your information and file are the original and one copy of each of the required Monthly Reports of Drilling and Workover Operations conducted during October 1985. If you should have any questions, please call Lynn Alexander at 564-7609. Very truly yours, Everett D. Wilson Administrative Manager LA/ah Enc RECEIVED Alaska Oi~ & Gas Cons. Co~m~ss~on Anchorage - ? ' STATE OFALASKA ' AL'AS'KA r~'"'~ AND GAS CONSERVATION CC .,,llSSION MONTHLY REPORT DRILLING AND WORKOVER OPERATIONS 1. Drilling well J~ ~ Workover operation [] 2. Name of operator ( 7. Permit No. Conoco Inc. 85-229 3. Address ( 3201 C Street) Suite 200~ ~fichorage, AK 99503 4. Location of Well * at surface 813' FSL, 702~ FWL, Sec. 18, T13N,'/RllE, U. M. 5. Elevatio~ ia feet {indicate KB, DF, etc.) I 6. Lease Designation and Serial No. 59' KB ! ADL 47438 8. APl Number 50- 029-21450 9. Unit or Lease Name Milne Point Unit 10. Well No. B-18 11, Field and Pool Kuparuk River Field Kuparuk River For the Month of. October , 19 85 12. Depth at end of month, footage drilled, fishing jobs, directional drilling problems, spud date, remarks Depth at end of month: Spud Date: 9-17-85 Footage drilled: 39' 10,931' MD 13. Casing or liner run and quantities of cement, results of pressure, tests None 14. Coring resume and brief description None 15. Logs run and depth where run DIL-CDL-CNS-GR from 10,872' to 9,595' 6. DST data, perforating data, shows of H2S, miscellaneous data R£CEIVE'D None Alaska Oil & Gas Cons. gnchoraos 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. SIGNED /~' /' ~ TITLE Supervising Engineer DATE NOTE--Report on this form is required for each calendar month, regardless of the status of operations, and must be filed in duplicate with the Alaska Oil and Gas Conservation Commission by the 15th of the succeeding month, unless otherwise directed. Form 10-404 Submit in duplicate Rev. 7-1-80 GEARHART INDUSTRIES, INC. :: .ell .a~~~~- ~ /P County ~~C State ~/~~ ~ Date Job Ean ~-~- ~ Blue Lin~ / Sepia Pre-Fo]~ t .Eo]]e~ Logs mailed to: ALASKA OIL AND GAS COMMISSION .3(301 PORCUF'INE DRIVE ANCHORAGE~ ALASKA 99o)1 ATTN: WILLIAM VAN ALEN CRRR~ PRINTSHAILEDFROB ~/'~~~-'-/~~ 2" & 5" LOGS ARE COMBINED INTO ONE PRESENTATION 2"/100' TOP DEPTH TYPE ? - 5"/100' TYPE BIfF[OM DEPTH "/-)[xNOV 0 8 o - · [//'Nas, ga 011 & Gas Cons, Oommllsio~ : k.,/ Anchorage ~0. :OF LIS TAPES Conoco. Please date and sign and return in the enclosed self-addressed envelope and return COtlO John R. Kemp Manager of Alaskan Operations Conoco Inc. 3201 C Street Suite 200 Anchorage, AK 99503 October 31, 1985 Mr. C. V. Chatterton, Chairman Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Dear Mr. Chatterton: Enclosed please find the "Well Completion" forms #10-407 from Conoco's Milne Point Unit wells No. B-17, B-18, and E-2. If you require additional information concerning these completion forms, please contact Kent Stolz at 564-7641. Very truly yours, E. D. Wilson Administrative Manager pab 5/vv Enc RECEIVED t .ov o 6 · . ,; ',.,,I .... "'., * ' ~.- STATEOF ALASKA ---- N0 gI G INA [ ALASKA ,.L AND GAS CONSERVATION C( MISSIO WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1. Status of Well Classification of Service Well OIL [] GAS [] SUSPENDED [] ABANDONED [~] SERVICE [] ~. Name of Operator 7. Permit Number Conoco, Inc. 85-229 3. Address 8. APl Number 3201 C Street, Suite 200, Anchorage, Alaska 99503 50_029-21450 4. Location of well at surface 9. Unit or Lease Name 813'FSL, 702'FWL, Sec..18, T!3N, RllE, U.M. Milne Point Unit At Top Producing Interval 10. Well Number 1523'FSL, 867'FEL, Sec. 14,' T13N, R10E, U.M. B-18 At Total Depth 11. Field and Pool 1552'FSL, 1361'FEL, Sec. 14, T13N, R10E, g.M. Kuparuk River Field 5. Elevation in feet (indicate KB, DF, etc.) I 6. Lease Designation and Serial No. Kuparuk River 59'KB I 47437 12. Date Spudded 13. Date T.D. Reached 14. Date Comp., Susp. or Aband. I 15. Water Depth, if offshore 116. No. of Completions 9-16-85 9-30-85 IO~(-4-85I N/A feet MSLI 1 17. Total Depth (MD+TVD) 18.PlugBackDepth(MD+TVD) 19. Directional Survey I 20. Depth where SSSV set 21. Thickness of Permafrost 10,931'(7326') 10,833'(7268') YES[~ NO[]I 1892 ' feetMD 1800'+_ 22. Type Electric or Other Logs Run DIL-CDL- CNS-GR-SP 23. CASING, LINER AND CEMENTING RECORD SETTING DEPTH MD CASING SIZE WT. PER FT. GRADE TOP BOTTOM HOLESIZE CEMENTING RECORD AMOUNT PULLED 9 5/8" 36# L-80 0 6407' 12 ¼" 17155x Permafrost E 275sxClas sG&30sxPer~ -E 7" 29# ~-80 0 10 908' 82"~_ 3305x Class G 24. Perforations Open to Production (MD+TVD of Top and Bottom and 25. TUBING RECORD interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD) 12 SPF,, 5" casing guns, 120° phasing 3~"2 9.2#L-80 10,440' 10,146' (~-1)10,314'-10,381' (6957'-6998'TVD) Buttress 10,413' (LK- 1) 10,674 '-10,703 ' (7175 '-7192 'TVD) 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. DEPTH INTERVAL (MD) AMOUNT& KIND OF MATERIAL USED 27. PRODUCTION TEST Date First Production Method of Operation (Flowing, gas lift, etc.) Date of Test Hours Tested PRODUCTION FOR OILoBBL GASoMCF WATER-BBL CHOKE SIZE GAS-OILRATIO TEST PERIOD II~ Flow Tubing Casing Pressure CALCULATED~ OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-APl (corr) Press. 24-HOUR RATE ~ 28. CUR E DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips. .. RECEIVED Alaska 0il & Gas 00ns. C0mmissi0r~ Form 10-407 Submit in duplicate Rev. 7-1-80 CONTINUED ON REVERSE SIDE · · . ;: ::-ii. ~--?iii:i-:'?:'.~:TGE01-0GIC~;I~I~Ri~ERs_:'.'::.: ~:".i' iL-~.?:".;;.i ?.;i.'.~? :. !!'..-"".::; ::~ ": :: !': i!--'. :i~:oR'M~,TIoN TEsTs ' r: ~. ..... · ~',..,; ' :'. ..... ; ,'.-: .. . . -. NAME Include interval tested, pressure data, all fluids recovered and gravity, MEAS. DEPTH TRUE VERT. DEPTH GOR, and time of each phase. KA 5136 ' 3884 ' · MA 5552' 4124' NA 5927 ' 4345 ' OA 6126 ·' 4464 ' T/Kup. Interva: 10,070' 6806' Middle Kuparuk 10,314' 6957 ' Laminated Zone 10,520' 7082' Lower Kuparuk 10,674' .7175 ' . 31. LIST OF ATTACHMENTS 32. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed ~ ~I/r, ~~ Title ,~/,~/1/~'. ~ ~/,~/~o Date ~/~/:~ //~'~' INSTRUCTIONS General' This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Item 1' Classification of Service Wells' Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21' Indicate Whether from ground level (GL) or other elevation (DF, KB, etc.). Item 23: Attached supplemental records for this well should show the details of any multiple stage cement- ing and the location of the cementing tool. Item 27' Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In- jection, Gas Injection, Shut-in, Other-explain. Item 28: If no cores taken, ir~dicate "none". . Form 10~,07 Eastman / I Whipstock l)'~ A PETROLANE COMPANY REPORT of SUB-SURFACE DIRECTIONAL SURVEY CONOCO, Inc. JOB NUMBER A]_085C0409 SURVEY BY B JAHN TYPE OF SURVEY _ DATE 04'-OCT Al Oil & Gas Oo~s. Oo.¢,,~miss~or~ OFFICE AP. o]-'.or aq e, Alaska Eastman (907) 563-3650 P. O. Box 4-1970~Anchorage, Alaska 99509-1970 Date: October 18, 1985 Conoco, Inc. 3201 C Street Suite 200 Anchorage, Alaska 99503 Well Number: Pad B, Well No: 18 Location: Milne Pt. North Slope, Alaska Type of Survey: Gyro Multi-Shot Date: 04-0ct-85 Method of Computation: Radius of Curvature Surveyor: B JAHN Job Number: A1085G0409 Atten: Mr. Dan Robert son Dear Mr. Robertson: We are enclosing the original and one copy of the Gyro Multishot survey run on the above mentioned well. To date, the following distribution has been accomplished: A. 1 Copy delivered to drilling in-house distribution. B. 9 Copies noted for oil company representatives. C. 3 Copies for E/W permanent well files. We wish to ~ake this opportunity to thank you for using Eastman Whipstock and look forward to being of service in the future. e~ely, TOM J DistrJ~ Technical Coordinator TJ/ta cc/file cc: Phil Salvador - Conoco West Coast & Alaska Division O.G. Kiel - P.E.S. Reservoir Section Conoco H.E. Gilliland - P.R.D. Reservoir Section Conoco William Van Alen- Alaska Oil & Gas Conservation Commission J.L. Weaver - Chevron U.S.A., Inc. Dave Engstrom - Chevron U.S.A., Inc. San Ramone Office Jim Laws - Champlin Petroleum Co. C.E. Seery, Jr. - Reading & Bates Petroleum Co. Nell Buttram - Cities Service Oil & Gas Corp. Directional Drillers/Sub-Surface Surveyors/Instrument & Tool Rentals/Sales/Worldwide EASTMAN NHIPSTOCK, INC. REr':ARD OF ,z.i IR'UF-V FOR · ~m OF'ERATOF;.'. .~. · .~ STRI_IL-":TI..IRE : F'AF.~ B ..~ · ~- WEI..L : 18 · ~:~- L OCA T I ON ~:. l~m '__lOB NI..IMBER : ''¢ /¢ S''¢'''E.-- ~:.'' 9~C' '* .~ / · DECLINATION : 30·5C) E . · RKB TO '.BRA : 5'F./.O ..~ CONOCO., INC. * SI...OT : 18 * .~.,.. MIl.NE F'OINT., I',.iORTH .-C;I.F-~F:'E-, AI...A'..-];KA * .~,c ~,,.. F'I_ANE OF VERTICAl. SECTION * . FI!REE:TION : N 84 18 W * EW OI:.:.;TRICT : ANE:HOI-'RAGE~, AI.ASKA / Eastman t Whipstock A ,~"TROLANE Q~f:~ANY C:OIqOCC~, INC:, PAD B MII..NF; POINT, NORTH F;I.OF'E, A[..ASKA SI..OT : ~.:5: WE~.L. : 1. 8 PB. HI.. : N :5:4 18 W DATI=. PRINTED : 18-0CT-85 OI..IR REF. IqO. : :305280.7C0 ,JOB NUMBER : ,,,4'/0~ PAGE N!.-.~. 2 MEA.=,LRE-..[~ DRIFT DRIFT COURSE TRilF. VERTICAL SLIB'.=.;EA R E ~,-.: T A N r'~ II L A R C L 0 S U R E FjOCq_EI DEPTH ANGI_E DIRE_.TION LENGTH VERTIF:AI... '.=-;IF.C:T!Cfl',I TVD C F~ C~ R D I N A T E S DISTANCE DIRECTION SVRTY D M D id .F4EI='TH D I"1 5('~0,,00 0 45 S 65 C) E :L('~0,00 600.00 0 !5 S 73 0 E 1.00,00 7('~0.0() 0 45 '.=; 6'? 0 W 1. 00.00 800.00 :2 0 N 86 0 W :1.0("}.00 'i'.'~00. O0 :=: 0 N E::.-.':: (") t4 100 ~ (] 499 ,, 97 -:2,46 440, ':-..'7 1 ,. 64 N 2,6:.7=: E 5'.:.~9, 9'7 -3, :2:(.) 540,, 97 1, :'5::3 N 3.45 E C..,79 ,. 76 -:7.-..:, :=:9 640,96 o./-,6 N :3,47 E 799,93 --.1., 08 740,, 9:3 0,, 31 Iq 1, I I lie 8'F..' 9. :=: 4 ::.:: ,. 28 840 ,- :=7:4 0.7:5', N :3.2 :]:: t4 0.00 S 90 0 E 0.00 ("~. 44 N ,_,'='.1 0 E 0 .5o_ _ 1.31 N 7:E: 20 E 0.07 1./=,5 N 49:2::7: E 1.21 '.=' ':":' N '-' ='- ':' /' · ':, .:, E 1 3 ,. 10 N Fi:.,-.:~ E 0. :3 C) :3./:,9 N /-':'..,,_, 55 E ('),,. ~(')_. :'::. 5:3 N 7'7..' 1 :t E 0 ,, .'F,'/.-, !.. :L6 N 74. 26 E '!.:--:6 3,:'3.1 Iq 77 :tC, N :L.O:I 9 ,, 16 94.0, 66, 1/.,,. 5 5 ]. 040. :39 :F:/:,. 4 :'~:1. ]. icj':..-], :E::=", 4:1 1/-, `1. 'T,':"::, 73 60, '7:3 1. :3:2, 6, 67 1,,40 N '?.(")5 W ";." ':":" kl 1/", ::!'-', W ..1_ I, J_, ..' -- u -- 5. 1.4 N 26. 1. 0 W '.=J./.-, 5N 40.4 (') W .t6.:37 N 59.4. c) W 9. t'i,) Iq 79 59 W 0.77 1/",.,/_-,0 N 79 59 W 1. C)C) :.:'./-, 6C) N -"-' ='-' _.. /,: ...... .-' W 2, ,-1. :1.. 54 N 7 /'',1 ,:',1 N 74 '-'= W 2 26 ,.. . .- . ~1 ._1 · E: 4. 12 14 :_-'.: 3, E: 1 t :3, 09 t 5 :,:::':T¢. 47 14. 8.6'? 1 ,"=, 25.-:, ',E',':T.' 1. 8 7. '.-T,' 0t 71 4.86, 2:.:.:0.4:'.2 1805. :.2'5' 2:2.72 N ,:q:2,27 W '=:'7, 26 N 1 t C). '?.'2: W ::',:7.21 N 14.6.2; W :2::::. :36, N ]. 85 · 00 W 4.5.76 1',1 227.00 W 85.35 N 74 34. W 2.9:,? 114.'..-=':3 N 76 12 W 4.40 149.7:2 N 77:2:4, W 3.L::2 :182:.94 N 7',2:17 W 0. 2:F: 1.57 N 78 3:6 W :3. ,_, ,:~ 200 C). 00:30 C) N 7':..-/ 0 W 10 C). 0 C) ]. 95'=.'. 16 ';i' 1 C) 0.00 :=: 4 C) N :=', 1 0 W 1 ('-)0. C) C) 20:2: 6,. 95 2'5'(')C) ...... , (")(-)....... :37 (') N 81 (') bi :L(')(') . (-)C)_ _ '.~1 't.E:. ..:,._.,'-'-'= · 7:=:C) C).00 4.~ 1.~] N 8 .1 0 W 100. C) C) 2195.9_1. 240C).00 44 C) N 82 0 W 1C) 0.0C) 2269.48 :277.9:=: 1. 89:3 ,, L 6 :3:3 C). 7 .A .1 977.9.=~ :3 8:=:. 7:3 :.T.:O 5 9, :.3 5 45 :t · 7 .~ 213 ./=, ~ '?; 519. :7:: 4 2'..2 .1. 0, 4 E: 54. :".'!: 7 N 273. E::3 W 64 · C) 7 N :2::..76.01 t4 7:.-::. t 5 N :3:=.::3. :_::6 W 8:3.C)2 N 445.67 W 9:3.0:=: N 512.63 W 27'.-.-* "~'-' . ..... · .~:,:, N 7::: 40 W :2: (')C) :332,24 N 78 5:.5: W 4.14 :3'70.27 N 79 t2 W 3.00 ='"' N 79 27 W 4 521. (:)1 N 7'.-.-: 43 W 2.8:3 25C)(2).0C) 44 45 N 82 C) W 1C) 0.0C) 2:2:40.96 :26, 00.00 47 45 N 81 0 W 10c).00 2410.10 27C) 0.(2)0 5C) 45 N :5: .!1. 0 W 1(])0.C)0 2475.37 2:=-:00.0C) .=;'2 t5 N :=.:1 C) W 100.00 25:37.6'2 2:'700.00 55 15 N 87 0 W 100.00 '-.','59/=,. 75 CONTtNI..IED ON NEXT PAGE .... 5E:9.22 2:2,'.:.: 1.96 6/:, 1. :36 · 2:.-_-:5 i..1. o 7:36. '.-T,:F: 24! i,~ :37 :2:15. t 1 2478,, 6,2 895.64 25:--:7.75 102.76 N 11:2:. 44 N 12.=;. 2'? N 1:37.5:3 N 149.45 N 58`1.89 W 5?0.89 N 79 59 W. 0.75 .-~ .' '-'(' :3 . . 65 :=-:,. '='- '-' W 6,6:3. 10 N ,:, .) 9 W . c)"9. 72F-:. 14 W 7:7.:8.84 N :_=:0 14 W 3.00 805.43 W 817.09 N :=;0 t'? W 1.50 :5:85.18 W 897.70 N C-:0 25 W 3.11 Eastman CONOCO, :INC. PAD B MII..NE F'OIAIT, NORTH E;I._CiPE, AI_ASKA S I.OT : :1.8 WELl ' 1.:.-~ PBHI_ : N 84 18 W F'AGE NO. 3 MEA'.:T.41_IREO DRIFT OR IFT COURSE TRUE VERTICAL SI_IBSEA R E C T A N G U L A R C L 0 S U R E DOGLEI BEPTH ANGLE DIREC:TII:H'q LENGTH VERTICAL '.=;I:=CTION 'f'VD C 0 0 R D I N A T E S DISTANCE DIRECTION SVRTY D I'1 D H [IEPTH D M 3000.00 56 15 N 81 0 W 100.00 265:3.03 978.20 25'24.03 ::3 .1. 00.00 55 30 N 8] 0 W 100.0C) 2709.12 1060.:B4 2E, 50. !2 :3200.00 55 45 N 81 0 W 100.00 2765.58 1143.25 2706.58 :B:30(:). 00 55 0 N 8:1 0 W 100.00 2822.4(:) 1225.40 :2763.40 ::: .... 4 F) () ,0. C) 5 4 4 ~_ N ,.., '=' 1 0 W 10 0.0 0 2 8 7 9 . '? 4 t :3 0 7 . ('). 5. ....,..,.'~' '=''2. (').. 9 4 :'::500.00 55 0 Iq 8:1 0 W 1(:)(:). 00 2':-.~:37.48 1:7::88.7'1. 2878.48 :--.: 600.0 F) .... r-] ._% (') N 81 0 W 100.. 00 ?._'=~ ....... ".-'~ 4 F:: :2: ~ 470 49 '-'. :.':):....,.'-' ~'=., . ::.'..: :..-:: :2,' 7 0 (') (') C) ~ 4:3,:": N :=: 1 0 W 10 C) 0 (:) :3 (').'=;:2 ''=' '=:' 1 ~ "=:''''' ,:.')';;' 2'=.."=:' :'::..=:;.'::'~ - " ..... · . -- , _1 .. I ...I ._t .~:~. u ..... . ...... :_7800,00:54 1~ N :=.':1 0 W t0(:).00 :31!0.Fi:0 t6:3:3, t7 :30~.t.80 :}:: '.-:.' C) (') , ()0 54 0 N [--~ 1 C) W 10C). C)C) :=.: 16'.-';..'. 40 1714. ,. 0./, 2:1 ~ 0, 4(:) t/=,l. 6/. N 966.92 W '.-}80.35 N E:O :30 W 1.30 174.61 N 1048.69 W 1C)6:Z.:. 12 N 80 3:.-: W 0.75 1:37.5:3 N 1130.21 W 1145.66 N 80 35 W 0.25 200.40 N 1211.48 W 1227.?/5 N 80 36 W 0.75 2t3. 19 N 1292.,77 W 1309.74 N 80 3:3 W 0.'--' · -"-'= '-':¢9 N :::(9:2:9 W 0 ':'R' · .' ...'...., N 1:37:2: (").:'~ W 1 ::: 9 ,1 52' · · · · ....... l. ....... r, .' .~ 2:3:3.80 N 1. 45:3, ':76 W 1. 47:3.44 N :=: C) 40 W 0 · 00 25 .1..58 N 1534.62 W 1555.10 N 8(:) 4.1 W 0,,5C) 264.2'? N 16t4.'.'.=,0 b.; 1636.:_=','::~ N 80 42 W 0.25 276. '..77 N 1694. ~/:.-=: W 1717.4 .1 N ,'-=:¢) 43 W 0~ 25 :2 :::: 8, 28 N 1. 775.42 W 17 ? :3./:,'7 N '='""'=' 97 N 1 =:.~/",,/=,:.=: W 1880.55 . F; .... -- .... - ..... N :=:0 _.1 W (') ~/-, ::3 1 0. :3 7 N 1 ?:3 7.7 5 W .t. li~]/:1 '2. 4 5 lq :=::..:!1 ./=,'.=.~ N 2C)1F:~24 ~ '.=_'04:=:.7'7..'N F:¢) ~7 W 0.75 342. 15 N 217'?. 1 .l W 2.-'. :.---.:05. :=: .1. N 8 .1 5 W 2.4 :=: :349.2:3 N 2260.C) 9 W 2286.'71 N ::-31 1:3 W 0.25 :356.39 N 2:341.94 W 2..'. :36::3~90 N 8 .1. 2.1. W 1,50 36:3.59 N '2424. 16 W '.-]451. 7:7 N 81 :TL:: W 0. :37(') 7:.-": N 2505 76 W ':'~':"=' ¢)4 N 8; '-'~ W (') ' ,,' · -, .~ I . · . - '" ,' d.-'.._.l._, . 5000.0 0 54- 0 N :34 0 W 100.00 :3:=:04. ".:-~ 4 26 t 1.4:3 :3745. ':.-¢ 4 !:'-; I C)0.00 55 0 N ',F::5 C) W 100.00 3:=:6:_=:. 01 26'=-.{2. :--:'F~ 3:::(:)4. C) .1 ~_ 2 (')_ (')_. (')_ c)..,:., ._,~- F) ...... N ,:,._,"" = F) bi 1 (') (') ,0 (') :7=:'? 20 . :37 '.:'. 774 , :_=: F) ..... :..3 :-]/-, 1 . :37 5:_=:C)0.00 55 0 N 8"i- 0 W 100.00 3977.7:.--: 2856.7,~ :771:E',. 73 5400.00 5,I- 45 N 83 0 W 100.00 q. 035.27 2938.5(} 3':.--'76.27 r]f31'qTINI..IED ON NEXT PAGE · '_::7:3.52 N >-"5:36. g':,7 W '.26,1. 4.22 N :--': 1 40 W 1. 11 :=:86.3:,? N 2667.7 ]. W 26'.=.~5.54 N 8 .1. 4,'.'-, W I. 29 · 3'F~:3.46 N 274'?.31 W 7:777.32 N :31 51 W 0.00 40].:31 N 2830.85 W 2:7-.:5'.=.~.15 N 8.1. 56 W 0.E:2 410.57 N :,:=:'? 12. ~ 2 W :.--_"'::/40.92 N 81 5:3 W (:) · 86 4 ! '::~. 79 N 2993.00 W 3022.3(.'.) N :--_',2 ] W 0.96 429.6'? N 3(.]73.6:3 W :3103·57 N ::.:2 3 W 1.64 440.97 N 3;53.'22 W 3 .184.60 N :=:2 2.:: W 0.75 45',.-]. ].'? N 3233.78 W 3265.24 N 82 2 W 0.00 ~-':'4.~ 76 N o-:, 4 6:3,4 ('). N :--: :3 ,1. :3 .5.1. W .... .-,-.- , ,_, .. 2 W C) ,2 5 Eastman 4 t:~i r;~O~ ANE C'X,)MP/,1NY CONOCO., INC. F'AD B MI LNE F'O INT.-, NORTH SI..OF'E., AI.ASI.:::A SI...OT : 1 ':',_, WELL. : !:":: F'BHI. : N 84 i8 W T_~ATE F'R I NTFB '" - -' '-"= : I ,:, -- U L.. T - ,: ,..., nl IR RF..F NLq : .=,0 .... ..',":,0., 7C0 ,_IL]B NI_IMBER : ,~/'¢ 75 c~ Of¢'ol; PAGE NO. 4 MEA:_=;LIRED DRIFT DRIFT COI..IRSE TRUE VERTIC:AL .'_:;UB::.;r.:'.A R E C T A N G U L A R C L 0 S U R E r'u]GLE( DF:'F'TH ANGI..F. DIREiC:TION LENGTH VERTICAl... SECTIr/N TVD C: 0 0 R D I N A T E S DISTANC:E DIRECTION SVRTY D M D M DEPTH D M ~-,0 () 0., 0 O, 53 0 N 82 0 W 100, 0 (') 4 :.388.46 :34'23, 2 t .4:399, 46 ./:,100.00 53 15 N 8:3 0 W 100.00 44.4:'_"::. 4.6 3503.16 4:B8'7,'. 46 ./.'.', 200 ,, 00 52 30 N 83 0 W t 00 ,, 00 4508 ,, 8'2 :Z.: 582.87 444'F.-,'. :::: 2 6300, 0,:") .~"].. 0 4 ~. N ,_.....o.:, 0 W I ,E:) (').. (") 0 4. 57 () .9 ........ C) :::/-,/., .1. .25 4- 51 .1. .9. O. 6400, (') 0 51 0 1'4 ::33 ("~ W 1. 00.00 4,,/;, 34.. (:,0 3'7::-i:8, :91 4-!575.0 () 474· 55 N 3392.:35 W 3425.88 N 82 2 W 0.50 4.84.99 N :'::472. 16 W :'::505.87 N 8:7 :3 W 0.84 45:'4. '71 N 3551.30 W :3585.59 N :":-:2 4 W 0.7!_=, F,... 04 .26 N ._':-:/,....,...";.":,'.., 11 W .:, 6 ,.-, :3 . ~,' 7 N ,=, :7 F,._ W 1 ,7.5 513, '71. N :2:7 C, 6, I 1 W :2:'741,54 N ::.:.:2 7 W 0, 2=:. ,,.'.:,5oc) (')C) .=.i:,7..: .......... : ..... W 1 (} 0 o (7) 46'-T.'/.., 08 :3817 1 '2, . ~ 8 6600.,0C', 5:2 (") N :":'::3 0 W 1()0. C, 0 475'7,47 :38'.:.:'6, .1.0 4 6 'F,' ::-: . 4- '7 ,S700.0C) 5:'-3 30 N 84 0 W 100.00 48!:E:./_-,'.:.:' :'::'P'75,, 16 475'..T.'.6'!;;' 6800.00 .5:3 15 Iq :-]: ~.~ 0 W 100 ,, 00 4. 87'F,'. 05 4054.8'? ~'.l- 820.05 ,'.':,':-.,'00 ~ 0() 5:3 0 N 84 0 W 1 ()0.0':"~ 4'i7,':':-:',-.-*. 0/.', 41 ::'.:4.8:.":: 4880 ,. ,."'~./-, · _,/..'_',. 27 N :_R 7 F:.::.3. q':.-"7' W ::: ::"!: 1 c:., 92.: bi 82 :"::': W 1 ,. 25 5:3."2,, 85:' N ::3862. '26 W :38'F':E:. 85 N 82 9 W ('). :25 541.84 N :3".'? 40.82 W 3977,. '.:;' 0 N 8:2 1 (7.) W 0. '.-'.,' 4 550.!7 N 40:.2(7.). 12 W 4057.5'.;,' N 82 12 W 0.75 ,,'::"-' .'"~ :3 N 4 (') 9':;, 67 W 4 .1 .'2:7 .=, ~ ':'": .... ,,-, N 15 W o '...'F', .... ,' .... ,' . '---.. '~-~.~.- . i 70()C). C,O 5:3 :!:(:) 1'4 :"'::!5 0 W 1 (:)0.00 4'F"F.'8. :-3."F' 4;,7_' 1. 5. (:)(7.) 49:'?,'.:.;'. 8'.:::' 7100,. 00 5:7,: 0 N 85 0 W 1 () 0.00 5 () 58.72 42.:i 95. 12 ,,'4-'.:,:".:.:":? ,, 72 '7'2 ("} 0 ,, ,:':),:") 53 45 N 8 !5 0 W 100.0 c) 511. 8 ,, :38 4-:375.37 50.59. :38 '7:_--:00, 00 5:3 4.5 N 8/_", 0 W 10¢). 00 517'7.5 .1. /I. 455 ,, :-.".."P 51 1 :::i:. 51 7'I-¢)(') .... , (')(') ........... F, 4. (') hi ::~/- (') W lC)C),, 00 ..':4'":"-:'/-......, ..,, .4.7 4=,:'.::/-, ...... ,, 7:-..::";:I. 7'7.. ,/¢7 5/::,6,21 N 4179,43 W 4'217.61 N :::::2 17 W o,94 57:2',. 2o. N 4'-:'.=,'..'','.,.__ .., 2M. W 42'.-]'7 , /-?]_,... N P, 2 2(")_ W ('~_, ._'5(") 5 8("), 1. 5:' N 4:3:3'F.', 2 0 W 4:3 7 7. ::.', 1 N ',':: 2 2 :':-: 1.4 0, 7 5 5 8 6 ,. 5 2 N 4 4.1. 'F./. 5'F.,' W 4,.-1.'5 8, :2:,.1. N :E: 2 2,./.', W 0.81 5'-.?":' :1.~ N .4?]Cx') '17 W 4.~':":' '.:?/-, N :.:.':2 ::',0 W · ~._ ~ -- -- . ~ . ,_ .,., i...1 · . - 5'F..' 7~ 8 (") N 45 :E-.: (). :--:'7 W 4. 61 ?, 7 ! N ::: 2 34 W 0.0 (') ,,:., r):3, 4 ?i N 4/: 1- 1 7 (-) W 4700 /', 0 N 82 ":: 7 W ~"), '-' ~-- 6 ()?.;'. 1 1 N 4 7 4. 2./_-, 6 W 4 7 :F.,' 1.6 2 N 8:7..:' 4 ! W 0 ~ 0 0 614.7L=: N 4:::'23.7!5 W 4862.77 N ::.',2 44 W o,7' 620.47 N 4'.--,'05. O'F., W 4'.-7.'44,. 17 N ::::7 47 W 0,2-,...... 8 (])00.00 54 45 N :--:': 4, 0 W 1 C)0.0 C) 55 :-36. 1. :2: .'.5024. O'F,' 5527. 1:3 :!:: 1 ('~(.'~_ . OA. . 54 :::0_N ,:,'-"-",. () W 1 (')c). . .00 5,'544.02 ~ ........ 1 ()5,56 ~.~:::.~. (-)2 ',::2 (7.)(7.) c)(') 0'-.--,' . .... 5 4 :'-': (') N 8/-, (-)W 10 0 . C) 0 .... ..... / (.)..-'. C). 'T:. ?"; .... 1 ::',/-, . '.-.-; 2 ._Pi/-_,_4 ._,':'... ::', ':', (~ C)_ ._ ..., Oc) 54 :--:0_ _ N ,,:-:-7_, (3.W 100 . (')(-) .=,7/-,(')_ _ . . 1 ,'i-, .=;'.'}/-':', 27....,_ _,,.., 57(')1. lA,_ 8400·00 55 0 N :37 0 N 100,00 581.7,77:7 5:349, 84 5758, 87 /_-,26. 16 N 4'F,':s:6.55 W 50'.:_.'5.71 N :.=.,'2 51 W 0.00 6:::.1. 14 N 5067.?3 W 5.107.08 N 82 54 W 0,.85 /-,_ :::./-._, 1 1 N514 9 . t 9. W ....~ 1 :.2:8 .3 4 N ,.. ,:.'q'--' .5 7 W O., 81 641. (7.):.:: N 5'.7-' 30.46 W 5:26'F.-'. 60 N 8 :':: 1 W 0.81 /_-,45. :.'],'6 N 5:} 12.01 W 5351.0/_:, N 83 4 W 0.50 :::.~(-~("~ 00 %.=, 0 N o/ . . _ ...... : .- '"'~ (') W 100 00 5:.=:75.23 5.4:2:] ./':,/.:, 55 16.2:':: 8600. (7.) c) 54 4.5 N :'-": 7 o W 100.00 5'.-.? 32.77 551:3. :'::/:, 587:3.77 ::::700.00 55 0 N :--: 7 0 W 100.00 59':7,' 0.5:0 55 ? 5.06 5'? :31.30 8800.00 55 30 N 87 0 W 100.00 6(.')47.30 5677. 14 5'?88.30 :.2:'F.,' 00.00 55~ 15 N 87 0 W 100.00 /:, 104. 1:3 575 ?.'. :':: :.3 6045. 1:3 CONTINUED O1`4 NEXT F'AGE ..., 647.65 N 5:.--.:93.81 W 5432.79 N 8:3 8 W 0.00 /-,5:~ 9:3 N 5475 4':.-~ '4 .~.=i~ 4 4c) N 8:3 11 W 0.'~= -- . · · -_ -_ .. · . -" 658.21 N' 5557. 17 W 5596.01 N 8:':: 15 W 0.25 /_-,/:,2.51 N 563'~. 22 W 5678.0(:) N 8:3 18 W 0.50 666.81 N 5721. 5:'.-.",' W 5760.12 N 83 21 W 0.25 - . Eastman Whipstock A PETRO~ANE CFIhlGl":i-i., I NF:. F'AD B MTLhlE F'O!Iq'F, NORTH SLOPE, AI.A'..:;KA · SI..OT : 18 WEI...L : 1,.:,° PBFIL : N :=:4 18 W DATE PRINTED : 18-0CT-85 OUR REF NO .... ~.~,'-'c,. .... :.', (..) ..,,.. c,., 7 C 0 ,_lOB Ni. MBER ' ~¢/~5C~ o¢'o~ F'AGE NO. 5 MEASURED DRIFT DRIFT COUR'.:;E TRUE VERTT. CAL '..:.;I.IB::;EA R E C T A N G U L A R C L 0 S U R E DOGLE( DEF'TH AhlGI,,.E DIRECTION LENGTH VERTICAl SECTION TVD C 0 0 R D I N A T E S ]]ISTANCE DIRECTION SVRTY D M D M OEF'TH D M 9000.0 ('). ._5.,~~ 4. 5 N ,,.'::,.."~ 0 W 100 .00 /:,, 16, 0 .77 5841 .61 ~:,, 101 .77 'F~100.00 55:30 N 88 0 W 100.00 6217.23 572:3.78 6158.2:3 .9200,,00 54 0 N 88 0 W t00.00 6274..94 6005.47 6215. 'F~300.00 53 45 N 88 0 14 100.00 63:33.~/0 6086.08 6274.?/0 '~7400.00 52 45 N 88 0 W 100.00 63.9:3.7:3 6166.04 4,334.73 'P 500~ 00 52 30 N :::8 (") W 100.00 8,/I. 54~ 4, 3 6245. ::: 4. 6:3'.;~5.4:3 9600.00 52 0 N 89 0 W 1()0.00 6515.65 6324.19 6456./:,5 '!;~ 7 (')0 (')(') '"-'-' .... . ........ ,' (') N :::':~ C) W 100 0 (") 6 ~ 7'7 2 :.--.". /-,4(')'.--' 7:3 ~' .=~ 1 :.",!: 29 9800 ,, 0 c) 52 0 N 8',:: 0 W 100, '00 ,/;, 6:38,78 ,'.':, 48 .1. ~ :31. 65'7':.-'.', '78 ?'F,' 00, 00 '."5 .I. :30 N 87 (') W 100.0 (') 6700, 6'.?.' 6559.72 664 :!, 6, 9 /_.70.41 N 5:903.72 W 5:--_:42. :..:2 N 8:3 >?.5 W O..96 673.2.9 N 5886.21 W 5924.5.9 N 83 2:::: W 0.25 /_-,76.1.4 N 5?67.82 W 6006.00 N 8:} 32 W 1.50 678..96 N 6048.55 W /.:,086.54 N 83 36 W 0.25 681.75 N 6128.6:} W 6166.4:} N 83 3.9 W 1.0r~, 684.5:} N 6208.05 W 6245.67 N ::::.-": 42 W (i).25 686.60 N 6287.0'F./ W /_,.,:::24. 47 N 83 46 W c). 94 687..97 N 6:z:65~8'7 W 6402.94 N :::3 50 W 0.00 69 ('). C):=: N /-, 444 .6.5 W 6481 . 48 N ,':'.,._"~ .-~._,'=' W 0 .79 6'..-.,~3.46 N /_-,52:_::~ 10 W /_-,55'?/.',::6 N ::::.--.: 56 W 0.?:'.-: 1 (z) o 0 (';). 00 51 30 N 8'7 0 W t 00.00 6762. '.-.? 4 66:'".':7. 'F*O 6'70:3, .94 1 C) 1 (')0, 00 5:1 -1.5 hi :---:7 (') W 100, 00 68'..-:_'5, ()'.'::' /-',7 .1. 6,2.0 6766, (')2 t 020 c), ()0 !52 0 N :::i: 7 0 W 10('), (')(') 68~: 6.76 6794.78 6827 ,, 7 1 (')30 ~.") ,, (")0 52 0 N 87 0 W 100. (')0 6"..? 48, :3:3 ,/_", 87:3.4':-:~ 68 P, 9. :-'-: :3 1 (') 4 C)(') c) (-) :=;2 30 N 87 0 W 100, 0 (') 7 () 09, ~; 5 ' '::' =''''' ' ...... ~::, ::..,,:.., 4',--', 6':.?50, 677.55 N ,/:,601.25 W 66:3:...3.01 N 8:3 58 W 0.00 701.66 N /_-, 67'.--.~. 54 W 6716. '2.9 N ::': 4 0 W 0 ,, 25 705.77 N 675:9..1.0 W /_.',794. 85 N :'-':4 2 W 0.25 70':?. ':.?(.') N 68:36.7.9 W 687:3.55 N 84 4 W 0.00 7t4.04 N 6915.75 W /:,.952.51 N 84 6 W 0.50 7 .I. 8. ':.'-' 0 N /-,':--.* 95.25 W 70 :.--.: 2.02 N ::: 4 8 W (1). 50 722.3::: N 7075.00 W 711.1.78 N 84 '[0 W 0.0(") 726.58 hi 7155.0.1 W 7.!91.:E:] N 84 12 W 0,50 731, .51 N 7'.-.'":'.~,......_. 6:'::. _ W 7272 . ~2_ N 84 14 W 1 . " 7 ::: :3. :':: 8 N 7:7...' 62.35 W 72':.? ?. '2:':? N 84 14. W 0. ,... 1(')'?'.-.:'1 ..................... C)(') 54- 1.=~ N :::/-, (') W '.;';::: 0(-) 7 :3 '.:-': .5 ~::: 737:'--:. 7:--: 7266.58 738.9'.~' N 7 :3 .41. /_-, .9 W "' "~/ ._, 7,_, '''--~ .... 78 N 84 1 F, W 0.00 CLOSURE - DISTANCE : 7378.78 !]!RECTION : N 84 15 W REPORT UN I TSFee t :.:.;I_IRVEY CALCULATION METHOD : Radius ,:,~: c,.~r, vatur-e SURVEYOR: B .JAHN G Y R 0: :--:.9.9 CAMERA N~]: 07'~ ?90 DEG A/U NO: 15/'-,'T-' ,J t-.~B N 0: A 1085 G 040".,? SURVEY RI. IN INFORMATION Eastman .S~.,IRVEY RUN I NFORHAT ION - (C:ONT INLIED) DATE RUN: (:)4.-FHZ:T-:F:5 NOTE: :108::-:::::: .-- .1. 0'F¢3 :1. MTJ ARE F'RO,JECTIONS ONI. Y TO F'BTD AND TF.I Eastman/ ~-~ Whipstock l ~~ ,4 PETROLANE CtOMPANY CONOC:O, INC. PAD B, WF..I.I. NO: 1:~: GMS ,_lOB NO: A MII..NE POINT.~ i~ORTH SI...OPE, ALASKA GMS., () - !. 0 :B :'_-: :-_-: MF.~, SI. IRV.F. YOR: B ,JAHN~ DAT.F. RUN: 04-0CT-'S5 FI[.E: 2?62 RFCOR.O OF INTERF'OI..ATFI"'~ SURVEY ~_Eastman ~ -~ Whipstock l)~ A I~ tRO~ANE C'X2IMPP, NY ]:0 N 0 F:O, ! I',lc:. :'AD B., WELL I',10: 18 GMS 'tII...NE PO! BIT, NORTH SL..OPE, AL.ASKA MARKER- ............... C 0 D E ............... NAME ,_ll.-.I B N 0: A 1 (')::: 5 G(") 409 I<A KB KC I<D LA TRUF '.F;L IBSEA MEASURED VERT I CAI. VERT I CAI.... DEPTH DEPTH DEPTH FEET FEET FEET MA MB I'1C NA ... ._ 0 · . ._! m., ,_! .. ! n _ · -.,..;. 1 "), 0 C) :39 ',.-': 7.8:2: :3,:,/=, o. 8:3 526,2. £)0 37;55. '=7;:3 389./:,. 93 5:370.00 401, 8.00 :3959.00 5:396.00 40:3:2. 9/-, :3 NB NC I',.ID hie rqF 54:39.00 q. 05 '7.9 !. '::'--¢ '..--¢ :.=: 9 ! ~ ~ ~"""'-' 00 4 .1. :2:7-:: /=,:7: 4064 /., 3 · . ! ... i ...I .,", · fl r -- , 547 c). 00 -~ 1. 92.60 4 t 3:3. ~.":,0 57/:, 4,. ,:")0 4 :..':.'. 48.0:3 4; 8'P,. t":, :.3 .ZJ..,... ,:::, ....~. !59'":'.: 7.0 c:, 4 :_:: 4- 4.7 ::3 '-'"'" =' 78 OA EiB UNC:C~NF., MKR 1 T/K I 596:2:. 00 4:366 ,. :32 4:3 t'-) 7 ,, :2: ;7.:: ~':;':;':' C:, c:, 4. :38'7 ':;:,"=, 4. :2:2:3 '2/-, /'-, () 17. (:)0 4:3'P:.:::. A/..:, 4, :7-: :3 ':=' . /=, ;/', /:, 05 ()., 00 4. 41. 8, 46 4:=i: 5 S;. 4./..:, 609:3.00 4444.. :26 4:3 85 ,, '.=: 6, "F / M K- 1 B / M K- ! "F / M K--2' B / M K - :=: / 12,'3, {")(") 44 ::', 4 L &, 44 () ~; 1 A ....... ,1 -- N ,. ~ /",.'=':..,-.'-:' 1 . (-)_ 0 45 ',=.". 1 . :.=. .... ,=] 44/=, :;;? ,, :::_ f'].. ':.';,' 744,00 /:/= c) 4. :31 ;3 =;,:1. 5 ,, 31 9 :E',:q 9.0 0 ,':, 6 6 2. !? :3 A,,}, 0 :P,. '? :3 10070.00 /=,80/=,. 4,:} /:,-/47..40 L-~: L-'F/ T / I._ K- l B / L K- .1. T / L K-:2 1 t;) 3: .1. 4.0 (:) 8'F.,' 5 ./=,. 9' 0 6, 8'.:.,' 7. '.=:.-' 0 t 0343.0 c) 4 '.=;,. 7 .q-. ,-,.'. 'f, 6 ':.-; 1 ~ .65 10 :=: 45.00 A'F, 75. ',:-', ,':-": 6, 916, ,, ',P, 8 1 C):7: 7'.P. 00 6, 996.6'? /:, 9 :.-':: 7./-., ]. C)51 ? ,, ¢]'0 70::: 1.51 7(')22 ,. 5 .1 1. 0531.00 70:=-::8.7:2: 7029.7:3 105-48.0 C) 7098. '.-7; ,,.'-., 7 C):39. '?/_-, 1 (:)6.74.0C) 7 t 74.5.,-]- 7115.54 .1 t]:,704, 00 71 ,:'7/:2.45 7 .1:2:3.45 1 (") 723 C:,,:') 7'..:' 0 :':: /_.. ='- .......... -.._, 7:1. 44.65 L. UMF I.. TAT I ON T I ME DATE · o -- I..I I... ] -- ,;, ._, !.t: i0:5/., 1~' --'- '-'= F'AGE NO. R E C T A N G U L. A R C: Iii Iii R D I N A T E S FEET C L 0 '...:;.' U R E D I RTANCE II I RECT I ON FEET D M 388.8? N 2/.-,97.07 W 3'P4.48 N 2759.91 W :398.:33: N 2799.87 W 407.7'::-¢ N :...-.:8:.R. 7.74 W 4.1 C). 20 N 2'=-; 0,_,°. 87 W 41.4. 16 N 2943../.',6 W 4:7::4.94 N 3034.9/:, W 4:37..59 N :3127.:-35 W 4.48, 15 N 2::7.'.05, t")3 W 4,.::....., 41 N :3:=:34 ':=,"=' W 2724,9:.--..: N :::.1. 48 W :...]:787.96 N 81 52 W 2828,06 N 81 54 W :.:.:':.::,'16,3.-'F.-' N 81 58 W 2'.-T,'37.6,5 N 8.1 58 W 'h 2.'=.-,'72. 66 N :.=.,'1 59., ¢ :=-:064,5 6 I',1 8 :,.:':' 2 W :31/=, C). 2'.-.":' N ::-:: 2 2 W :=:2:36.2.1 N 82 2 W ::3:3.67. :,T::9 N 82 2 W 470.42 N :=::]-:/.:,:_=:. 50 W 474.:33 N :':.::371. 27 bi 476 ,, :32 N :E: 4 C) /.:-, . :_--:.4 W 47'?.77 N :34:32.....,'=l bi. 4:.=:4.26 N :34/:6.6:1 W · ':, .=, c,, /_ 24 N ':"=' o W ._, ._, .. _, ,, t_, d'. .~. :3424.23 N 82 :.3 W :34:=:9,48 N 8::? 2 t4 :3465. :-.-.:8 hi 82 :3 W 35 c) c) ,, 27 N :E: 2 :3 W 4. :.3'7.5'2 N 34'i.'-; 2.74 W 4'F.¢C-,. 7.1. Ixl :3567 ,. 64 W 6,::_':8. :::: 8 N 4, q-00.54 W /:,91. :37 N /=,475.24 W 7C)0, 4:3 N 66,56.06 W :?:.526,. ,6 t') N :=.: 2 :=: W ::-: 6 c) 2 ,. 05 N 8 :.'..!'. 4 W ,.(:,4:37.:50 N 8:3 51 W 651'2.C:'5 N :=::3 54 W 66'.T'; 2.81 N :Fi: 4 0 ' 710.4 :.=': N 6, 847. :=-:5 W 7'!..1.68 N 6870,75 W 71 1.76 N /=,872. :3:7' W 7t3. !7 N /:,899. t7 W 7.1.9,0t") N 70.1.0.40 W ~-,884.6t]:' N 84 ..¢., W 6'F,,'07.50 N 84 5 W /=,? 09.0 :F: N 84 ..=; W /:,'?:35.'P:3 Iq 84 6 W 7047, 17 N 84 ? W 71. '=.-,'. 50 N 701. ?, '? 7 W 720.21 N 7o33.53 W 7';:::.-$. 49 N 71 :.34.21 W 72/=,,.77 N 715:3.24 W 727.71 N 717:_'3.56 W 705/=,,75 N 84 9 W 7070.._,~.1. N 84 o.. W 7171,00 N 84 12 W 7:195.04 N 84 12 W 7210,.'2,'7 N 84 !2 W astman Whipstock A PErROLANE CC~fF'-ANY ':ONOCO, INC:, :'AD B, WEI...L NO: .1. :3 GMS I!LNE F'OINT, N(]RTH SI. OPE, ALA'.=;KA MARKER ........... ............. C: O DIE ............... NAME ,_lOB NO: A 1085G040'..-.~ B/LI<-2 PBTD TRUE SUBSEA MEASLIRED VERT I CAI_ VERT I CAI DEPTH DEPTH DEPTH FEET FEET FEET 1. 0783.00 7239.0'2 71:30.0.'2 10833.00 7268. :2::3 7207. :}:3 107.,'31.00 7325,, 58 7:..7.6/.:,, 5:.'-'.': COMPUTATION TIME DATE 11:;0:56 18-0CT-85 PAGE NO ' 2 R E C: T A N G U L A R C 0 0 R O I N A T E S FEET 730,67 N 72:7.1.'F*:3 W 7':' ':' ~-:,c: N 7262 35 W · .., ... i ~, ... ,, . 73:.-.-:,"?~2 N 734]..6~ W C L 0 S U R E DISTANCE DIRECTION FEET D M 7:758.80 N :34 13 W 7:,799.2? N 84 14 W 7378~7'.-} N 84 15 W Eastman Whipstock A PE'TRr. XANE GONf~Y CONOCO. !NC' ......................... PAD B, I,,/ELL NO: 18 ISMS M!LNE PO!NT, NORTH SLOPE, ALASKA ........ EASTMAN WHIPSTOCK', INC. . . i ............. .t .................. ~ · ,--,.., .- ...... i ............ ...... .~ ................ ~ ........... ! ................ ~._.._~___~.__~___.__~_~_~ ......... ! ....... ~! - . . . ~, .~ .... . ....... ..... HORIZONTA'L 'PROJECT ................... ION ...... '"': 1 'i ................................... ~...~..ii .................... .!,~ ......... ,..~'-" ........ .......... ~. ...... ~ ,.- SCALE I IN. DEPTH INDICATOR~' :TVD ] . .. ~ ...... f - _ ~ - . . . . ~ I · ~ ...... 7070 6454 $8T5 5295 _ 4696 2341 ~INAL STATION' DEPTH 10931 MD- 7325.58 TVD NORTH 738.92 WEST 7341-69 CLOSURE 737S.79 N 84 15 10 W PAB B, WELL NO~ 18 OMS I'IlLNE POINT, NORTH SLOPE, ALASKA' EASTHAN WHIPSTOCKI. INC. · 0 0 2000 _ 4000_ 6000_ 8OO0 1000 20OO 3000 4000 5000 6OOO 7000 8000 9000 10000 I I I 0 2000 4000 6000 VERTICAL:SECTION .CLOSURE .... '7~78~.7_9 _.iN_.84 1.5_ .10.. W ', 10931 I 8000 VERTICAL ........ PR'OJEOT"I ON' ................... , ..... ~ SCALE 1 IN. = 12000 FEET ; Suggested form to be.inserted in each "Active" well folder to check for timely compliance with our regulations. OPERATOR, WELL NAME ~ND NUMBER Reports and Materials to be received by: //-~ ,~ .... ~~ Date Required Date Received Remarks Completion Report ~y ~._~ ~~. .---,.-~-~ Well History Samples ~u~ ~o~, .. ~ ~,-,~'~__,~~, ~_ ...- .... __,.~1~ Core Description Registered Survey Plat Directional Survey Drill Stem Test Reports Production Test Reports , , ./ , , . , Digitized, Data,, L. FJ. 04 Eastman Whip s!q c k (907) 349-4617 P. O. Box 4-1970~Anchorage, Alaska 99509-1970 Oct. 1~ 1985 William Van Alen Alaska Oil and Gas Conservation Commission 3001 Porcupine Dr. Anchorage, Alaska 99501 Dear Mr. Van Alen Please find attached two copies of the Gyro Multi-Shot survey run for Conoco Inc. on Pad B, Well No: 18. This is to be considered a formal letter of transmittal. The data herein, is to considered strictly confidential. A copy of this letter is being sent to Conooo's represen- tatives, Mr M. Bradshaw and Mr S. Davies. Should you have any questions regarding this survey data, please refer all questions to CONOCO INC. TOM ~~~~B~~~~n~~al Coordinator S. DAVIES Directional Drillers/Sub-Surface Surveyors/instrument & Tool Rentals/Sales/Worldwide Conoco Inc. 3201 C Street Suite 200 Anchorage, AK 99503 (9071 564-7600 October 15, 1985 State of Alaska Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501 Gentlemen: Monthly Report of Drilling and Workover Operations Attached for your information and file are the original and one copy of each of the required Monthly Reports of Drilling and Workover Operations conducted during August 1985. If you should have any questions, please call Lynn Alexander at 564-7609. Very truly yours, Everett D. Wilson Administrative Manager LA/kss Enc RECEIVED Alaska Oil & Gas Cons. Commission Anchorage STATE OF ALASKA ALASKA : AND GAS CONSERVATION CC. ,VIlSSION MONTHLY REPORT uF DRILLING AND WORKOVER OPERATIONS · Drilling well [] Workover operation [] 2. Name of operator 7. Permit No. CONOCO, INC. 85-229 3. Address 8. APl Number 3201 C Street, Suite 200, Anchorage, AK 99503 50_029-21450 4. Location of Well at surface 813' FSL, 702' FWL, Sec. 18, T13N, RllE, U.M. 5. Elevation io feet (indicate KB, DF, etc.) I 6. Lease Designation and Serial No. 59 ' KBI 47437 For the Month of September ,19__ 9. Unit or Lease Name Milne Point Unit 10. Well No. B-18 11. Field and Pool Kuparuk River Field Kuparuk River 85 12. Depth at end of month, footage drilled, fishing jobs, directional drilling problems, spud date, remarks Spud Date: 9/16/85 Depth at end of month: 10,435' MD Footage Drilled: 10,435' MD 13. Casing or liner run and quantities of cement, results of pressure tests Ran 157 joints 9-5/8" 36# L-80 BTRC .casing. Pumped 1715 sx of Permafrost E cement with 5#/sk gilsonite and 275 sx Class G with 3% NaC1 and 1% CFR-2. Pumped 30 sx Permafrost E for top job. 14. Coring resume and brief description None 15. Logs run and depth where run DIL-CDL-CNS-GR from 10,872' to 9595' 6. DST data, perforating data, shows of H2S, miscellaneous data None AlaSka Oil & Gas Cons. Af~chora~3 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. SIGNED TITLE ~f'~ ~J' ~'~z'~ DATE NOTE--Report on this form is required for each calendar month, regardless of fl~e status of operations, and must be filed in duplicate with the Alaska Oil and Gas Conservation Commission by the 15th of the succeeding month, unless otherwise directed· Form 10-404 Submit in duplicate ~, 7_1 _~(5 - i'MEMORANDUM TO: THRU: FROM: State of Alaska AI~iS}~ OIL AND GAS CONSERVATION COb~IISSION Chai~'-- Lonnie C. Smith Commissioner Bobby D. Fosteri'~ Petroleum Inspector DATE: October 1, 1985 FILE NO: D. BDF. 103 TELEPHONE NO: SUBJECT: BOPE Test Conoco M.P.U. - B-18 Permit #85-229 Kuparuk River Field Tuesday, September 24, 1985: The BOPE Test began at 12:15 AM and was Conc%~d~d 'at 2' 15 AI.{~ 'As the attached BOPE Test report shows, there were three failures all of which are to be repaired, tested, and the A.O.G.C.C. Office or myself notified. In summary, I witnessed the BOPE Test on Conoco's B-18. Attachment NOTE: I was notified by Mr. Mountjoy that the repairs had been made and all tested OK. :. 02-00IA(Rev. 10i79) O&G 5/84 STATE OF ALASKA ALASKA OIL & GAS CONSERVATION COMMISSION B.O.P.E. Inspection Report Operator ~,~3 ~~ Repr es ent at ive J~~z~ Location: Sec /~ ~~}/~M LP ~ ~//~casing Set Drillin~ Contractor~bD ~ Rig ~ARep~esentative ~~ Location, General ~/(", Well Sign~P~'~ ACCIIMULATOR SYSTEM ReServe Pit ~~/~ Pressure After Closure Mud Systems Trip Tank Pit Gauge Flow Monitor Gas Detectors Visual Audio psig Pump incr. clos. pres. 200 psig --- mind, sec. Full Charge Pressure Attained: ~ min~qsec. Controls: Master Remote ~SBlinds switch cover Kelly and Floor Safety Valves Upper Kelly / Test Pressure Lower Kelly / Test Pressure Ball Type / Test Pressure Inside BOP / Test Pressure Choke Manifold ~~Test Pressure No. Valves ~ ~ No. flanges Adjustable Chokes Hydrauically operated choke / BOPE Stack Test Pressure Annular Preventer Pip e Rams Choke Line Valves / ' H.C.R. Valve Kill Line Valves / Check Valve -- Test Results: Failures ~ Test Time ~ hrs. Repair or Replacement of failed equipment to be made within ~ day~ and Inspector/ Commission office notified. _ ! Distribution orig. - AO&GCC cc - - Operator cc - Supervisor September 13, 1985 Mr. Kent Stolz Production Engineer Conoco Inc. 2525 C Street, Suite 100 Anchorage, Alaska 99503 Milne Point Unit No. B-18 Conoco Inc. Permit No. 85-229 Sur. Loc. 813'-FSL, 702'F~, Sec. 18, T13N, RllE, UM. B~mhole Loc. 3730'FNL, !396'FEL, Sec. 14, T13N, R10E,. UM. Dear Mr. Stolz: Enclosed is the apProved application for permit to drill the above referenced well. The permit to drill does not indemnify you from the probable need to obtain additional permits required by law from other governmental agencies prior to commencing operations at the well site. To aid us in scheduling field work, please notify this office 24 hours prior to commencing installation of the blowout prevention equipment so that a representative of the Commission may be present to witness testing of the equipment before the surface casing shoe is drilled. ~%ere a diverter system is required, please also notify this office 24 hours prior to commencing equipment installation so that th~ Commission may witness testing before drilling below the shoe of the conductor pipe. ?tr~v~ours, C. V. Ch-atte~on' Chairman of Alaska Oil and Gas Conservation Commi. ssion BY ORDER OF THE COMMISSION be Enclosure CC: Department of Fish & Game, Habitat Section w/o encl. Department of Environmental Conservation w/o encl. Mr. Doug L. Lowery STATE OF ALASKA ~", ALASKA {.)IL AND GAS CONSERVATION CO,,,MISSION ERMIT TO DRILL 20 AAC 25.005 /'~j, .~. lb. Type of well EXPLORATORY ~ SERVICE ~ ~RATIGRAPHI~ ~ DEVELOPMENT OIL ~ SINGLEZONE~ ~-~_ '~/ I DEVELOPMENT GAS ~ MULTIPLE ZONE ~ ~ ~¢'~. /~ ..... I U. uni~ or ,ease name '/~/ ~ la. Type of work. DRILL F~ REDRILL [] DEEPEN [] 2. Name of operator Conoco Inc. 3. Address 3201 "C" Street, Suite 200, Anchorage, AK. 99503 4. Location of well at surface 813' FSL, 702' FWL, Sec 18, T13N, RILE, U.M. Attop ofproposed producinginterval 3780' FNL, 900' FEL, Sec 14, T13N,RIOE, U.M. Attotaldepth 3730' FNL, 1396' FEL, Sec 14, T13N, RIOE, U.M. 5. Elevationinfeet(indicate KB, DF etc.) KB 59' to MSL I 6. Leasedesignation andserialno. ADL 47437 10. Well number B No. 18 11. Field and pool Kuparuk River 12. Bond information (see 20 AAC 25.025) Type Blanket Surety and/or number 8086-15-54 Amount $200,000.00 . 13. Distance and direction from nearest town 14. Distance to nearest property or lease line 33 mi SE of Deadhorse miles 4630' at target feet 16. Proposed depth (MD & TVD) 17. Number of acres in lease 10,765' MD* (7236')TVD feet 2,560 19. If deviated (see 20 AAC 25.050) 120. Anticipated pressures o KICK OFF POINT 500 feet. MAXIMUM HOLE ANGLE 53.0 (see 20AAC25.035(c) (2) I 15. Distance to nearest drilling or completed well ~--~ ]20 feet 18. Approximate spud date 9/15/85 3100 psig@80°r Surface 3800 psig@7236 ft. TD (TVD) 21 Proposed Casing, Liner and Cementing Program SIZE I CASING AND LINER ~ SETTING DEPTH i H°le Casing / Weight I Grade t Coupling Length I MD TOP TVD MD BOTTOM TVD I 17~"1 13 3/8'~ 48_ !!5' 8~' 7" B~S 10730' 35 [ 35 0765' II 7236' ~ / I 22. Describe proposed QUANTITY OF CEMENT (include stage data) +!00 cf C.m..t +l 71 ~ .~k.~ PrmFr.~t "F," +275 Cl~.q.~ C, +296 sk~ Class G +180 sks Perm Cmt Conoco Inc. proposes drilling the subject well as an injection well in the Kuparuk River Field. The mud system will be low solids, non-dispersed with a minimum mud weight in surface hole of 9.0 ppg to a maximum of 9.4 ppg. Mud weight at TD will be 10.4 ppg. A 20", 2000 psi diverter will be installed on the 13 3/8" conductor for drilling surface hole. A 13 3/8", 5000 psi RSRRA BOPE stack will be used on the surface casing. Pressure tests will be performed as per State Regulations. BOP's, choke manifold, Upper and Lower Kelly will be tested to 500 psig and 5000 psig, the Hydril to 350 psig and 3500 psig. Casing will be pressure tested to 1500 psig. Maximum downhole pressure is based on initial reservoir pressure. Maximum surface pressure is based on an unexpanded gas bubble, temperature taken into account. The closest wellbore is B No. 8 which is 120' from B-18 at the surface. Arctic pack will be placed in the 7" X 9 5/8" annulus after disposing of test oil and excess drilling fluids. The well will be perforated, cOmpleted, and flow tested after the rig has been released. 23. I hereby certify that the foregoing is true and correct to the best of my knowledge use' ~?,~',f'F,/~J TITLE Production Engineer CONDITIONS OF APPROVAL n^T~ ~' .~mnCmmhmr 1 1 lqR"; Samples required I--lYES [~ Permit number APPROVED BY Form 10-401 Mud log required [--]YES ~.~0 Approval date Directional Survey required I APl number ~ES []NO I 50- o'~? SEE COVER LETTER FOR OTHER REQUIREMENTS ,COMMISSIONER DATE September 13; 1985 by order of the Commission Submit in triplicate SUPPLEMENTAL DATA SHEET APPLICATION FOR PERMIT TO DRILL Conoco et al - Milne Point No. B-18 Conoco Inc. 3201 "C" Street, Suite 200 Anchorage, Alaska 99503 I. CEMENTING PROGRAM me The 13 3/8" conductor will be set at 80' below the surface (115' K.B.), then cemented to the surface with permafrost cement. Be The 9 5/8" surface casing will be cemented with ±1715 sacks of permafrost cement followed by ±275 sacks of Class "G" cement. A top job will be done if cement is not circulated to the surface. Ce The 7" production casing will be cemented in two stages. The first stage will consist of ±296 sacks of Class "G" cement pumped around the casing shoe (estimated ±1133' of annular cement, based on 100% excess over gauge hole). The secondary cement job will consist of ±180 sacks of permafrost type "C" cement followed by ±60 barrels of Arctic Pack pumped down the 7" X 9 5/8" annulus. II. ANTICIPATED GEOLOGY 0' - 4500' Surface conglomerates, clay, silt and sand~ Estimated base of permafrost a~ sequences. 1700 · 4500' - TD Predominantly shale until the Kuparuk Sands- expected at ±6600 subsea TVD. III. FORMATION EVALUATION me Wireline logs for the 8½" hole (from T.D. to ±1000' above the Kuparuk interval) will include: Dual Induction log; Spheri- cally Focused log; Litho Density log; Compensated Neutron log - Gamma Ray. IV. DRILLING FLUIDS A high viscosity fresh water gel (non-dispersed) mud system will be used from 0'-1000'. A low solids non-dispersed gel/water mud system will be used from 1000'-Surf. Csg. Pt. Low solids lightly dispersed mud system 6500'-T.D. Ve DIRECTION PROGRAM The B-18 well will be drilled to a proposed KOP of 500', then build angle in a northwesterly direction. The closest that the B-18 will come to another wellbore is at the surface, where the proposed B-18 will be 120' from the existing B-8 well. Caution will be taken and an MWD tool will be run while drilling for surveying purposes. Final hole angle will be 53.0°. The proposed depth is an estimate only. If actual depth exceeds the permit depth by over 300', a Sundry Notice will be submitted. J. R. Hand Engineer RECEIVED AlasKa Oil & Gas Cons. Commission Anchorage CONOCO. INC. PAD B, 14ELL NO' 1,o~-"PROPOSED MI LNE PT., NORTH S,_oPE,~-ALASKA : _. · EASTMAN 14HIPSTOOK. INC. . . , ~ 1000_ 2000_ ~000_ 4000_ 5000_ 6000_ 7000_ 8000_ 0 SURFACE KOP lo 15 2o 30 ]'VD=SO0 TMD'"500 DEP-O '; ! i - .. · BUILD :>.5 DE~ ~ , . · PER 100 FI'~ ' . ', ~ · ! 5o EOB TYD--2:~30 THD=26 i · 1 ' i ' ! : : : . i ' . - 40 g DEP-911 · , I 2000 ' I · I I ~000 4000 VERTICAL SECTION I I 1 7000 · AlaSKa Oil & Gas Cons. Commkssi°n ' '. Anchorage I 1000 g 5/8' CSG PT ~' ~ TVD=466T TMD=6500 DEP=4010 ' ;/ ' : . 52 57. MIN TENTATIVE ID TVD=72~6 THD=10765 DEP=7415 :, , , : , - ! , HORIZONTAL PROJECTION SCALE 1 Itl. -- 1000 FEET CONOCO, INC. PAD B. WELL NO, 18 PROPOSED MILNE PT.. NORTH SLOPE, ALASKA EASTHAN WHIPSTOCK. [NC, 8000 3000 _ 2000 _ 1 000 _ 7OO0 6OOO I TARGET LOCATION' 3780' FNL, 900' FEL SEC. 14.. T13N. RIOE 'TEHTAT[VE' TD TARGET TVD-6860 THD-t 014.1 DEP-69! 6 HORTH 687 WEST 6882 5OOO WEST-EAST 4000 I ~000 2000 1000 0 ! , I 1000 I. N 84 DEG 18 HI N W 6916' (TO TARGET) ........... : SURFACE LOCATION' i i 8,3' FSL. tO2' FWL ~ SEC. 18. T13N. R11E I ,, I' )SURFACE 400 _ 300 200 100 100. 200 _ 50O 400 300 2O0 100 0 100 200 300 ~400 I ! I I I I I I I '' I ........ ~ ...................... "~ ......... . ................. : ....... ~:'T--,-, .... ;""- 4237.,--': ........ ' ........ l .... I~ -,~-~ ,~.~o · '. ..... ,... . : .-. ; .:. ~ .- ..... 7c?.' ....~. .................. ..... .... ;...._..-'_.' ................ ;_,.. .................................. I ...... ... ~ .~,~ ..~.'~ .......... ",~221 ............................................................... ~._..',_.,._-;..:'.:- ........ , ......... ~ 4061.:L.,_.~_ ....... I ........ , ~ ~ r-r-~ ' ,.'; ' ~ ........ ~ .. ,- . , ..... . .... . ." ..... · ........... ; ....... . ....... ."7 ......... . .................. ....... ................... . ......... T".'.-.,;'"-,."- .... .".'...-.' .......... .... ~.-- ? T-.-,----~-.TT---'~ -,- ..........,'" .-" ' ':':i-:i .... --~' .... ' ........................ .. NOTE, WEL[ PATHS EXTEND BEYOND THIS VIEWING WINDOW .......................................................... I .... 400-. 300- _-10 _200. I i I I I I I I I I 500 400 300 200 1 O0 0 1 O0 200 300 400 . . I FROM MUD PUMP KILL MANIFOLD FROM REMOTE HIGH k-----'[T)",~_ m__y,.~~REMOTE REMOTEoPERATEDPRESSURE GAGE SEN~~/y~ PRESSURE PUMP --~ '-~LLI ~ NOTE: ~ HYDRAULIC CONTROLLED I. HYDRAULIC CONTROL SYSTEM FOR BOP STACK P, CHOKE MANIFOLD TO INCLUDE (5) STATIO~ CONTROL MANIFOLD LOCATED REMOTELY WITH ~,000 PSI ACCUMULATOR R \/ ~60 GAL. RESERVOIR a AUX. ENERGY SOURCE. (51 STA. CONTROL MANIFOLD PLUS VARIABLE CHOKE / CONTROL TO BE LOCATEO ON.L~ RIG FLOOR.RP53 CL. //~ DRILLING 2. KILL 8 CHOKE MANIFOLDS ~u MEET APl SPOOL 5M STDS. ~,. KILL UflNIFOLO SIZE- RATING 2=- 5000 k } 4. CHOKE MANIFOLD SIZE- RATING 3"- 5000 . ~ HYDRAULIC: CONTROLLED - -' .~ Ri~OTE OPERATED -, ~ CHOKE ADJUSTABLE ~ ~ ~ ~ ~ ~ ~ ADJUSTABLE MANIFOLD -ti q !~ .___. TO SHALE BLEED LINE TO ATMOSPHERIC TO PiT MUD/GAS SEPARATOR kECEJVED CHOKE 8 KILL UANIFOLDS FOR' ClS/$~ 8 7" OD CASING BOP STACK J~ BOP MANIFOLD LAYOUT - CONOCO, INC. m I CONOCO INC. MILNE POINT UNIT 20" DIVERTER STACK ( ~ Flow Line Fill-up Line ~ - · ! ga'mular  Preventer -_ HCR L' L.L~ HCR ' , Valvel . ~ Valve , ,, --'2 ~ Drilling ~~ -- -" ~ "' 1 6 Relief Line ~ ~~) Spool (~~~ 6 Relier va ve , ~ 2000 psi ~ IN~ ' ~ ~ ~ Diverter Quick . . ~__ l~ Connect Assembly . ~' I ~~' Assembly {~1 ~ ' ' ~ - o Head e . I.' , '- - VED 1. Relief lines.from the drilling spool will be routed for downwind diversion. 2. Hydraulic control system will be in accordance with API specifications and AOGCC regulations. 3. Both HCR valves will open when the preventer closes, then either one may be closed. * Depending on rig contracted, the two 6" lines may be replaced by a ~ single 10" line with a downstream tee. DRC 7-17-R& CONOCO INC. MILNE POINT UNIT BOP STACK Fill-up Preventer ~Flow Line (1) B.O.P. stack size rating meets API RP 53 & spec 6A for class 5M with clamp & hub connectors all hydraulically operated. (2) BOPE to be operated on each trip & pressure tested weekly. (3) Hydraulic control system for BOPE to include (5) station control manifold located remote with i60 gallon accumulator and reservoir unit and auxiliary energy source for system activation. (4) Ram type BOP to include a minimum of one set of blind rams and two sets of appropriate pipe rams. (5) Choke and kill manifolds shown seperately to meet A_PI RP 53 class 5M requirements. 13 5/8" - 5000 13 5/8" - 5000 2" - 5000 Side Outlets 3" - 5000 Side Outlets 3" - 5000 Side Outlets 13 5/8" - 5000 11" - 5000 · o kECEJVED · Alaska 0il & Gas Cons. Cornrnismor~ Anchorage $1MPSO'¢'' LAGOON MILNE PT. UNIT I1[ EX, T,.G DE*E-OP. EN. ' Ill ~*SE~ ON P.O~.*C~E~ WLU~S Or THE II I SECTION CORNER POSITIONS. Jl ~~ e' u.,..,,: GEODETIC POSITION LATITUDE 70°28' 29.019" N. ~0° 28' 31 .981'N. LONG IT UDE . ,4s°z4' 4~.m~" ~ 149024' 42.854"W. STATE PLANE CO-O RDS. NORTHINGS FASTINGS .. 6 , 02a,586.20 571,864.47 LOCATION IN SECTION 'FROM W. LINE 790' 920' 979' 6 ,023,888.56 6 ,023 ,656.07 571,992.42 DATE 6.2 FROM S. LINE 765' 532' · 6.2° 85 372,052.77 ?0°28' 29.688'N. 149°24. 41. 146" W. 6.2, 85 q4¢' 'k)° zB Z$,'~g k) Iqq* 2A. 4Z.471 m. ~7 I, ~73. bqq i ~ ~ ~.~' ~ 8 ~ ~ . :j ~ ,m ¢¢/'4' ,,~ /7, "%':? -'~ III / Il L~CENSED 10 PRACTICE / ~9 ' ~:.~ %,,~¢v.q III hnll&~ ~ ~ ~.-~:"? ~ . G'~ III JJJJJJ(~ ~:' ~ ', LS.~379o ~ .- ~ .... ~2uhESSiONAL ~.~~ JIJL~ND s,uvt ~0~ 0il & Gas Cons O ....... ~ .... '~~~ JJJ [N0,1N[ ~asRa 0il & Gas Cons. C¢..*.~m','~,-. q -1 - ~- CHEC~EDt IFIELD. BOOK J.B.S. 21-85 J.B.S. J 21-85 d.B.S. 21-85 'B' PAD AS- BUILT WELL LOCATION Su*veyeO for CONOCO SCALE : J SHEET ' 1' · 400'J 2 0Ir 2 CO~.,u [ NTS , D'~ENSION THuS'~ FNC~ N L*NL L[C~ ~. Conoco Inc. 3201 C Street Suite 200 Anchorage, AK 99503 (9O7) 564-7600 September 1i, 1985 Mr. C. V. Chatterton, Chairman Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501 Dear Mr. Chatterton: Enclosed are the original and two copies of the Permit to Drill application for Milne Point B-18. A $100 check is being submitted with the permit application to fulfill the permitting fee requirement. If you have any questions, please call Kent Stolz at 564-7641. Very truly yours, Rogers J. Francis Manager - Engineering JRH/vv cc: MP B-18 Correpondence File CHECK. LIST FOR NEW WELL PERMITS Comp any C-'~-¢%,~, ITEM APPROVE DATE , ..,,' (2) Loc l, )~..-.~.. .... ~'"t",57-.? t'''~' 2 62 thru 8) 3. 4. 5. 6. 7. 8. (8) (3) Admin /¢~" ~"/'"~¢~.~ 9. (~J thr. u 12). ,¢' .. 10. (10 and 12)" 12. , (4) Cas§ #/~,?- (:~//~,.'"'~ , ,. , , ~j/': ~ ,, ~,. (13 thru '~1) (22 thru 26) 13. 14. 15. 16. 17. 18. 19. 20. 21. 22. 23. 24. 25. 26. 27. YES NO Is the permit fee attached ' ·.~.~..·..~....~.·...~......~.........® Is well to ~e located in a defined pool .... , ......... Is well l°cated pr°per distance fr°m pr°perrY line Is well located proper distance from other wells ..i ' . ' i . Is sufficient undedicated acreage available in this pool . Is well to be deviated and is wellbore plat included .............. Is operator the only affected party .............. Can permit be approved before ten-day Does oPerator have a bond in force · Is a conservation order needed ...~.·.~.~.....·.........·.·....~..... Is administrative approval needed ................................... th 1 b pp priat ' Is e ease num er a mo e ................................ . .... Is conductor string provided ........................................ Is enough cement used to circulate on conductor and surface ......... Will cement tie in surface and intermediate or production strings ... Will cement cover all known productive horizons ..................... Will surface casing protect fresh water zones ....................... Will all casing give adequate safety in collapse, tension and burst.. Is this well to be kicked off' from an existing wellbore ...... , ...... Is old wellbore abandonment procedure included on 10-403 .., ......... Is adequate wellbore separation proposed ............................ Is a diverter system required ....................................... Are necessary diagrams of diverter and BOP equipment attached Does BOPE have sufficient pressure rating - Test to ~ Does the choke manifold comply w/API RP-53 (Feb.78) .................. Is the presence of H2S gas probable ................................. Additional requirements ............................................. REMARKS Additional Remarks: Geology: Engineering: HWK LCS WVA MTM ~ HJH JAL rev: 03/13/85 6.011 INITIAL GEO. UNIT ON/OFF POOL CLASS STATUS AREA '" NO. SHORE Well History File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history file. To improve the readability of the Well History file and to simplify finding information, information, of this nature is accumUlated at the end of the file under APPENDIXi .. No special'effort has been made to chronologically organize this category of information. .o DIRECT DIGITAL LOGGING RECEIVED NOV 0 6 1985 Alaska 0il & (~as Cons, Comm188Ion Anchorage COMPUTER PROCESSED ANALYSIS Compans., CONOCO., INC. Well MILNE POINT UNIT 8-18 Fi~_ ld KIJPARUK DAI'E OF dOB: 09-.3 0-85 Co un t,,~ NORTH SLOPE Stmtm ALASKA Country,0 USA CLIENT FORMAT DATA TAPE LOG I N F 0 R M A 'T I 0 N ~,OTANDARD FORMAT ( L. I , o,'? )' t.d,_. 1 i Nc,: F:ONOF:C~ 8 ~ 8 [:,ept. hs ~ 4995, f.t i:i '~..o 1 bg.-4 b I Nar, m: MILNE POINT UNIT B-18 Fi m 1 d: KUPARUK DATE OF JOE:: 09-30-85 I, S, TAPE RECORDS RECEIVED NOV O 6 1985 Alaska Oil & Gas Cons, Gor~mi~ion Anchorage HEADER RECORDS Smr. v icm r,.amm ~ ::.'.:G5F 01 Pr~vioHs p~_el ~ Date: 85..~1 0,,:28 Origin: Comm~nt~: Ree 1 name 305009 Cont. i nuat i on ~: 01 TAPE HE~DER **** Service name: &G5F01 prmVious tape: [>ate: 85/10/28 Comment~: Origin: Tap~ name: 305009 Contir, u.ation ~: Oi .---- :.[,:* E 0 F' ** File name: .~.~._F01 001 MaximuF~, iength: ~024 HEHDER RECORD'-'~ Version File t.~pe: LO Previous ¢ile: Date: F'.~ g e I NFORHAT I ON RECORDS Pmgm MNEM CONTENTS UNIT TYPE CATG SIZE CODE C: N WN FN C 0 U N STAT C TRY SECT T 0 W bl RANG EKB EDF EGL WD LMF DHF RUN L CC SON L U N FL ENGI WITN DL TLt 8LI TCS TLA8 8HT MRT MT bioS MVI S RH RMF MFST MF,*¢. RbiC HCST MCOC. CONOCO.. INC ................ MILNE POINT UNIT 8-18 ............... KUPAR'UK DATE OF JOB~ 09-3u-~ ............... NORTH SLOPE ................................... ALASKA ................................... USA ................................... ~ ~ ..................................................... ~E, ,, ,, ,, ,, ,,,, ,, ,, ,.,,,, ,, ,, ,, ,.,, ,, .,,, ,, ,,,,,, ,, ,,,, 59,000 .................................................. FT 58 , O O 0 .................................................. FT 24, OOO .................................................. FT 3o5oo9 .......... 76i2 ......... NORTH SLOP~ NORTH SLOPE HUPP D~V ~ ES 10892.000 , , i'0872. OOO , , 4994.000, . , 10868.000 . , 2.000 ...... 9.470 ...... 156. OOO .... i56. 000 .... DiSP. WATER FLOWLiNE 52, O'O0 ....... ~ ,680 t ,500 ........ 70.000 ....... HEASURED i ,870 ........ 66,800 ....... MEASURED FT FT FT FT HR 'HR DEGF DEGF CP OHMM OH'MM DEGF OHMM DEGF 0 0 40 65 0 0 40 65 O 0 40 65 O 0 20 65 0 0 20 65 O 0 20 65 0 0 2 65 0 0 3 65 O 0 3 65 O 3 4 68 0 3 4 68 0 S 4 68 0 3 2 65 0 S 2 65 0 3 2 65 0 0 2 79 0 0 2 79 0 0 1 0 65 0 0 10 65 0 O 20 65 0 0 2 O 65 0 0 2 0 65 0 0 20 65 0 3 4 68 0 3 4 68 0 3 4 68 0 3 4 ,58 0 2 4 68 0 4 4 68 0 1 4 "' ,:,8 0 I 4 68 0 .', 90 65 0 2 20 0 2 4 68 O 2 4 68 o 2 4 0 2 4 68 0 2 12 65 0 2 4 68 0 2 4 68 0 2 12 65 COMMENT RECORDS ,.mm This LIS tape was writtmn b~, Gearhart Industries Wirelinm Smrs'icms, mm :~.-'~. All curvm and tool mne~onics used arm those which most closel,.¢ match .~m · '.~-~ Gearhart curve and tool mnemonics, mm GEARHART TO SCHLUMBERGER MNEM SERVICE UNIT MNEM SERVICE UNIT DEPTH FEET OEPT FT TEN MERGE MV TENS MERGE MV 9P MERGE AP1 SP MERGE APl GR MERGE GAPI GR MERGE GAPI ILD MERGE OHMM ILD MERGE OHMM ILM ~IERGE OHMM ILM MERGE OHMM LL3 MERGE OHMM LL~ MERGE OHMM CILD COMPUTED MMHO CILD COMPUT MMHO P.ag m D~ITI~ FORMAT SPEC I F I C~T IONS ENTRY TYPE SIZE CODE 0 I 66 P.=, g e ENTRY BLOCK LEGEND **** TYPE DESCRIPTION 0 T~rminator ,,' no mor. e ~ntrie~ ) D TA FORIdRT SERVICE SERVICE AP1 APl AP1 APl FILE HNEM iD ORDER # UNIT LOG TYPE CLASS MOD # OEPT 305009 FT 0 0 TENS MERGE 305009 MV 0 0 SP HERGE 305009 API 0 1 0 ~R MER~SE ~ 05 u u'.~ ~AP i 0 54 i LQ biERGE 305009 OHMH 0 i 20 II_H MERGE 305009 OHMM 0 i 20 LL3 MER.~E ~05009 OHHM 0 220 CiLD C:OMPUT 305009 HMHO 0 68 0 0 0 0 0 0 i 0 0 i 0 O 46 0 0 44 0 0 6 0 O 46 0 0 SPEC: 1 F I CAT IONS PRC SiZE LVL SHPL RC 4 0 i 68 4 0 i 68 4 0 i 68 4 0 i 68 4 0 i 68 4 0 i 68 4 0 i 6:3 4 0 i 68 PROCESS iNDiCATORS 000000 OOO00O 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 DEPT TENS SF' DA GR TA RECORDS i LD iLM LL3 CILD P.sgm i 0880, 000 3440,000 90,800 87.300 2 723 2.799 367 242 i0780,000 4274, 000 91 ,500 59, iQ[; 715 ,3 899 4,539 269 153 i 0680,000 4494, 000 -16,600 089 2 24') 4,624 478 630 1 0=80.,., 000 4372, 000 103,200 .700 5 224 5 433 J 94 089 1 0480,000 4406,000 113,500 67, ?00 5 794 5 689 172 .=. '" ' ._O,:Jr 0380, 000 4626.000 122,900 64,2.00 iO 186 8 6')0 7 379 98 175 t0280,000 4055,000 131,000 97 000 2 158 2 168 2 53'4 463.4,47 i0180,:000 4640,000 59.600 96 ~00 2 286 ,"" 249 2 109 437.522 i 0080 000 4'~ · ,~.i 'i, 000 61 ,200 i 07 000 2 897 2 360 ,7,45 144 9980,000 4'367 , 000 69. 400 97 200 1 68:3 1 626 i 714 594 292 988.0, '000 4172,00,0 70,900 95 5'00 1 811 1 722 774 552 077 ':~ 7 -"':"-' ... ~,O,OOO 4352,000 66,800 103 600 2 ,,449 2 355 2 535 408 319 9680,000 4.294.000 71 .200 165 I O0 2 4~,. 323 2 410 400 ..~ .. _, 9580 000 41':'~ . , ,' ~., 000 74,6'00 159 1.00 2. 037 2,004- 2 056 4,90 908 9,480, 000 4250, 000 77, 1 O0 112 200 i ,950 1 ,875 2 051 512 861 ..'3. R 0 000 4 i ':.'- ') , ,- , o~. 000 75,400 1 I 0 600 2.911 3 '006 4. 27 56,:. '~ D E P T T E N S SP DA TA RECORDS I LD I LM LL3 C i L [:' 9280. 000 4074. 000 7'5. 200 14,3 400 I 626 2 27'0 9i80,000 4040,000 68,500 91 · 2 679 2 704 '2 460 ._'373 '25 0 9080, 000 4055, OOO 62, 000 73 700 2 661 2 606 2 432 375 837 8980,000 3860,000 60,900 69 800 2 799 · 2 748 2 472 357 273 8880.000 3908,000 62,100 82 300 '2 535 2 523 '2 .506 ..'394 457 8780,000 .3918, 000 61 .600 68 700 041 2 972 2 710 328 852 8680, 000 ,3869, 000 60,200 7i 200 083 2 972 2 6,92 .-424 .34 0 8580,.000 3782,0'00 57.1 O0 75,300 3,055 2 972 2 612 327 341 8480,000 3840, O00 56, 1 O0 74. 600 '2,642 2 630 378 4.42 ;=~8.0 .000 4869 000 =" , , .;.o,100 80 600 2 858 '2 7.54. 2 541 4'z. 945 8280,:000 3733,0:00 49.100 74,000 2,77'3 o 7c, 9 '2 606 36 0 579 8t 80,.000 3650,000 49,300 71 .700 3, 069 2 979 325 837 8080,000 J¢03,000 52.600 63,5'00 2.¢49 2 065 2 061 444 63'i 36'06,000 45,600 78,800 4. 034 2 9 ~ g 2 692 3'29 6i0 7880,:000 3489, 000 52,300 57,. 100 '~,80=,., 2 754 2 606 356 4.51 7780 000 J4~o 000 300 73,700 2.339 .339 427 563 DATA RECORDS DEPT TENS SP GR ILD iLM LL~ CiLD iO 7680 000 ~294,000 433.100 64 lO0 2 8i8 2 667 S._~6 5i2 7580 OOO ~3333~,000 40,900 600 2 884 2 748 2 559 346 7337 7480 000 33279.000 39,800 81 100 2 9331 2 818 2 582 3341 i933 7~RO 000 33313,000 339,000 633 700 3 097 3 119 3 090 322 850 38.300 67 1 00 2 924 '2 818 2 985 S41 980 7'180 000 .:]186 000 35,400 78 300 3 155 2 979 3 055 316 957 7080,000 3103 000 332,200 ,.. 931 2 748 '2 911 6980, 000 33059 OOO 3~,i00 61 400 :3, '062 2 812 2 618 6880,000 2981 000 29,700 75 100 1 ,169 1 164 1 750 855 ' "~ 6780, (tOO 33079 000 25,800 67,400 3,177 8338 314 ;'"'75 6680,i000 2991 000 21,200 74,700 33.206 2 972 3ii 889 658'0,000 28:34 000 25,700 600 2. 028 I 9 36 't 991 493 1 74 64.80,000 2840,000 21 . 500 65,800 2. 203 2,000 2 47".' 4.533 942 ,..~=, 0, OOO 290,.,, 000 4,500 41 , 7.00 ~.70 i.54 525 Fi ie n~m,=_,: :~\GSF01 , 001 Maximum lmngt, h: 1024 TRAILER RECORDS '.Tmrsior, ~: Film t!,.,pm: LO Next f'ilm: Date: ii EOF *:~* HEADER RECORDS Film name: &GSFOI , 002 Maximum lmngt, h: i024 Vet-._=. i on ~: File tppa: LO Previous f'iim: Date: 12 M N E M C N WH FN COUN STAT CTRY SECT TOWN RANG EKB EDF EGL PD LMF [)MF RUN LCC SON LUN Fi. LUL ENG i W !TN DD DL TLi 8LI TC:S TLA8 8HT HRT MT MSS HVIS RM RNF biFST blFSS RMC HCST HCSS i NFORMAT 1 ON RECORDS C: 0 N T E F.t T S UNIT TYPE CATG SIZE CODE CnNOC:O., INC, bllLNE PFtlt-4T UNIT B-18 KUPRRUK DATE OF JOB NORTH SLOPE , ALASi<A , USA , 1 ~N .................. ile .................. ..~, 000 ............... 58 000 ............... 24 000 ........................ KB ....... ~,.,..,/30'~ 76i2 NORTH SLOPE NO F,'T H SLOPE .i-.iUPP DAVIES 1 0892, .000 i 0872,000 4994. 000, i 0~6~, 000 2,'000 .... 9,470 .... 156,.000, . i 56,000.. DISP, WATER FLOI:.IL I NE 52,0:00 ...... t , 680 ....... 'I . 500 ....... 70,000 ...... HEASURED t ,870 ....... 66,8.00 ...... MEASURED 09 '- 7, Ct - 85 ................ FT FT FT FT FT HR HR DEGF DEGF OR OHMN OHNN DEaF OHMM DEGF 0 0 40 65 0 0 40 65 0 0 40 65 0 0 2 0 65 0 0 2 0 6,5 0 0 2 0 65 0 0 2 65 O O ~ 65 0 0 ~ r:,5 0 ~ 4 68 0 .~ 4 6 :-': 0 3 4 68 0 7, 2 65 0 -" 2 65 0 S 2 65 0 8 2 79 O 0 2 7'9 0 0 iO 65 0 0 iO 65 0 O 20 65 0 0 20 0 0 20 65 O O 20 65 O L~ 4 68 0 S 4 68 0 ~ 4 68 0 7, 4 68 0 2 4 ,£8 0 4 4 68 0 1 4 68 0 I 4 68 0 2 2 0 65 0 2 20 65 0 2 4, 68 0 2 4 68 0 2 4 68 0 2 4 68 0 2 t 2 65 0 2 4 68 0 2 4 68 0 ,.'-~ 1 ~":' 65 13 COMMENT RECORD :~'~ This LIS tapm was urittmn by Gmarhart Industrims Wirmlinm Smrvicms. m-~ · ~ Ali curvm and tool ~nmmonics usmd arm t. hosm which ~ost closmly match ~m ~ Gmarf",art curve and tool mnmmonic~, m~ GEARHART TO SCHLUHBERGER MNEM SERVICE UNIT MNEM SERVICE UNIT DEPTH FEET DEPT FT TENI MERGE MV TENS MERGE MV GRi HERGE GAPI GR MERGE GAPI ',:<CA L 1 MERGE INCH CALI MERGE I N FFDCi MERGE CPS FFDC MERGE CPS NF[:'C 1 MERGE CPS NFDC MERGE CPS RHOB 1 MERGE G?C3 RHO8 MERGE G,." C 3 DRHOi MERGE G?C3 DRHO MERGE G?C3 FCNL1 MERGE CPS FCNL MERGE CPS NCNL1 MERGE CPS NCNL MERGE CPS CDL1 COMPUTED PU DPHI COMPUT PU NPHS~ COHPUTED SSPU NPHI COMPUT PU RAT 1 COMPUTED RAT COMPUT ....... t4 DATA ENTRY 8LOCKS ENTRY TYPE DE¢'F'-' ..... P:IPTiON 0 T,=.r. min.ator ,:: no mor. m mntrims ) FORMA T SPEC 1 F 1 CA TYPE SIZE CODE 0 I 66 T i ONS ~*'-~:~ DATUM SPECIFICATION 8LOCK9 **** SERVICE SERVICE AP1 APl MNEbi I[: ORDER # UNIT LOG TYPE AP1 AP1 FiLE CLASS MO[:' ~ DEPT 305009 FT 0 0 TENS MERGE 305009 MV 0 0 GR MERGE 305009 GAPi 0 54 CALI MER. GE 305009 iN 0 24 FFDC biERGE ~05009 CPS 0 98 NFDC MERGE S05009 CPS 0 98 RHOB MERGE 305009 G/C3 0 94 DRHO MERGE 205009 G/CS 0 1 00 FCNL MEF:.GE 305009 CPS 0 78 NCNL MERGE 305009 CPS 0 78 DPHI COMPUT ~05009 F'U 0 0 NPHi COMPUT ~05009 PU 0 122 RAT COHPUT 30.5009 0 0 0 0 0 0 0 i i 0 i iS 0 i 2 0 i i 0 i 0 i i 0 3i 0 i 30 0 i 0 0 i 2 0 i 0 0 SPECIFIPATION o F'RC ~ SiZE LVL SMPL 4 0 i 68 4 0 1 68 4 0 i 68 4 0 i 68 4 0 i 68 4 0 i 68 4 0 I 68 4 0 1 68 4 0 i 68 4 0 i 68 4 0 i 68 4 0 i 68 4 0 i 68 PROCESS iND iC:A 000000 000000 000000 000000 OOOO00 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 i 6 DEPT F C: i4 L. TENS HCNL GR DF'Hi DA CALI NPHi TA RECORDS FFDC RAT NFDC RH, O8 D F;.': H 0 F' .~ g 6: i7 1 0'3..24, OOO 0,000 ~ 90 8, 000 O, OOO £1, 000 i60.606 O, 000 9,7'54 0,000 -999,250 0 000 0 000 0, 000 108;24, 000 68, ,Lq 00 4..387,000 1:33, 000 49,697 7,360 4i ,350 1442,1 00 2,609 757 900 1 8._-40 .i09 i 0724,000 139,300 1 O 624, 800 i 15, OOO 42 =. ,.,0,000 302, 000 4465,000 258,. 000 27,455 74,000 28,,'727 7,i40 · 30,970 7,000 33,640 674,608 · --,'-' 058 764,800 2.238 662 729 700 lO0 '2 i97 2 i76 .i60 0524, o o 0 .,:, ~ 00 4372,000 271.700 65,300 24,2,:!.2 7,4:30 3i , 60(! 630,600 2,078 663 700 '1 0424 ii3,60,0 1 0,~:4, O 00 i0224,000 ,.300 1 0124, :000 ,;~. 400 i .0024., 000 69, :000 4c.:~,O'O0 ':=~ 200 ~.,J ~ 4., ~,,, 000 267,300 2ii,4.00 49'19. 000 23 O, 200 4338,0'00 198,900 66,400 ,::., 970 7'7, 000 -8,06 i i 00,50 O J6.485 00,900 14.545 12,800 20,182 9,020 32,220 9.630 24 ~OO ii ,OtO 32, 150 1 0,660 41 , 780 384,900 2.253 277,600 I ,966 4i6,500 2,541 429.4 O 0 2..382 457,400 2. 726 526 O00 500,900 528,300 545,500 528,900 '2 7'83 2 .',3 'i 7 , 0S6 .0,43 ,00.3 . U d, r' ,002 9924,000 ~,... 500 4~¢0,000 'I ,.":~ r'L tJ 1 02,200 4:3.280 530,500 2.750 ..,o 0,500 .007 9824,000 72 '7:0'0 4377, OOO 182.900 90,600 16,242 9.770 43,71.0 461 ,800 DATA RECORDS DEF'T FCNL TEI',IS N F: N L GR DPHI CALl NF'Hi FFDC RAT N F D C: RH08 D R H F~ F' .a g e 9724, 000 78,500 4435,000 i98,000 134,300 2i,333 11,350 43,590 50.8.508 2.773 546,388 2.298 9624, 000 6 9,300 4.509, 000 193,700 136,000 21 .576 9.350 42,500 527.100 2.735 572.608 2.294 .0,~6 FILE TRAILER m..~ ~. $ r, amm: ,.,,u._,~- 0 t , 002 M a :,..'. :irr, u m lmngth; 1024 TRAILER RECORDS Vet. sion ~: Film tppm: LO Next Filet HEADER RECORDS ~.'~ :~ :~. FiLE HEADER ~-~ File r, am~: &~SFOI.O0~ Servic~ name: M.aximum length: 10'.-°-4 File type: LO Version Date: I NFORMAT I ON RECORDS HNEH COHTEHTS UNIT TYPE CATG SiZE CODE CH WN FN COUN STAT CTRY SECT TOWN RANG EK8 EDF EGL PD LMF DMF RUN LCC SON LUN FL LUL ENGI WtTN DP DL TLI ]'CS TLAB BHT HRT MT MSS MViS RM RMF MFST HFSS RMC HCST MCSS CONOCO, INC:, MILNE POINT KUPARUK NORTH SLOPE ALASKA USA iSN,,, tiE,,, 59,000 58.000 24,000 KB ............ illlllllIllIII 305009 .......... 7612 NORTH SLOPE NORTH SLOPE HUPP DAVIES i0892,000 i0872.000 4994,0.00, ~0868.000 2,000 ..... 9.47'0,,,. 156,000,, 156.0'00.. DISPo WATER FLOWLINE 52,00.0 ...... 1,680 ....... t,5OO ....... 70,00'0 ...... MEASURED i,870 ....... 66,8.0:0. ..... MEASURED UNIT 8-18 DATE OF JOB IIll I iiii IIlIII IIIIII IllllIIIIIIJIIll 0~-3 0-85 ................ IIflIIaIlllIIIIIIIIIIIlI IIIIIIlltllllllIllll IaIIllll r i , I 0 0 40 65 0 0 4 0 65 0 0 40 65 0 0 2 0 65 O 0 2 O 65 0 0 20 65 0 0 2 65 0 0 .~ 65 0 0 3 65 FT 0 3 4 68 FT O ~ 4 68 FT O ~ 4 68 O ~ 2 65 0 3 ':'~ 65,. 0 3 2 65 0 0 2 79 0 0 2 79 0 0 icj 65 0 0 i0 65 0 0 2 0 65 0 0 20 65 0 0 20 65 0 0 20 65 FT 0 .3 4. 68 FT 0 .7 4 68 FT 0 ,3 4 68 FT 0 3 4 68 i4R 0 2 4 68 HR 0 4 4 68 DEGF' 0 I 4 68 DEGF 0 i 4 68 O 2 20 65 O 2 20 65 CF' 0 2 4 68 OHMM 0 2 4 68 OHMH 0 2 4 68 D il...-'. 'G F0 2 4 68 0 2 12 65 0 H Fi M O 2 4 68 DEGF 0 2 4 68 O 2 12 COMMENT RECORDS This LI'~ tape was written bp Gearhart indu_~-.tries Wireline All curve and tool ~,nm~onics used arm those which most closmlp ~a~ch Gearhart ,zurve mhd tool mnemonics. M N E M GEARHART' TO SCHLUMBERGER SERVICE UNIT MNEM SERVICE UNIT DEPTH FEET DEPT FT FCNL2 MERGE CPS FCNL MERGE CPS GR2 IdERGE GAPI GR MERGE GAPI NPHS2 COMPUTED' SSPU NPHI COMPUT PU TEN2 MERGE NV TENS MERGE MV NCNL2 MERGE CPS NCNL MERGE CPS RAT2 ' COMPUTED RAT COMPUT DATA ENTRY ~*** ENTRY BLOCK LEGEND **** TYPE DESCRIPTION 0 Terminator ( no mor.~ entrie-:. ) FORMAT TYPE SIZE SPECIFICATIONS CODE 0 i 6 6 FORMAT M H E bi SERVICE SERVICE AP1 AP1 iD ORDER # UNIT LOG TYPE AP1 AP1 FILE CLASS MOC, DEPT 305009 FT 0 0 FCNL MERGE 305009 CPS 0 78 GR MERGE 305009 GAPi 0 54 NPHI COMPUT 305009 PU 0 122 TENS MERGE 305009 MV 0 0 NCNL MERGE 305009 CPS 0 78 RAT COMPUT 305009 0 0 0 0 0 3i 0 2 2 0 2 0 0 '2 30 0 2 0 0 '.'-- ' :SPEC I F 1 CAT i ONS PRC ~ SiZE LVL SMPL RC 4 0 i 68 4 0 i 68 4 0 i 68 4 0 i 68 4 0 i 68 4 0 i 68 4 0 i 68 PROCESS iNDiCA~uM:5 000000 OOUUUO 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 000000 Page DATA RECORDS D EP T F C N L GR NF'H I TENS NCNL RAT F'agm ':.'5 G5 i 9,5 00 0,000 0,000 -. 1 ~7 2552,000 0 000 :{< :~ :~ :4< ~ :~ :4< :~: ~: :4< 6419.500 61 , 000 75.000 44.990 2649.000 173 900 '2 735 6319,500 57.200 49,500 44,930 2669,000 i61 400 2 885 6219.500 55,200 50, 000 45,650 259i .000 161 400 ~ 6 4 6119,500 50,000 46,200 53.320 2766,000 153 100 044- 60t9,500 59,500 31 .800 40,670 2537,000 i 75 7'00 '2 67"~ 5g19,500. '52,i00 47.600 49.150 25'~"c~.000 153 700 '2 940 5819,500 57.200 51 ,200 46. 250 2483. 000 164 700 '2 855 5719.500 53,000 35,000 53 010 '~='03 OOr~ , ,m ,,,,I, . 154 000 5619,500 59,000 26,200 51,520 2366.000 170.200 3 011 5.519.500 65.00.0 42,700 49.110 2327,000 172 000 541'9,5,00 55,00,0 26.5:00 50.570 2269.000 166 000 ',:2 935 5319.500 60,600 35.100 48,700 2278.000 1 74 700 2 852 5219,500 6'0,600 28,800 49,630 2200,000 172 000 19,500 47.000 ;39, 100 57,350 2186.000 147 900 127 5019,500 46.900 42,80'0 46,440 2186,000 15i 000 2 [) E P T F C H L GR DATA NPHI RECORDS TEHS N C N L RAT P .~ g ~ 2 6 ~I~ Film nar, m: :~GSF01 .003 Maximom length: 1024 TRAILER RECORDS Vmrsion ~: Film t~pm: LO Next film: Dat. m: EOF ~:~ EOF