Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAbout214-011David Douglas Hilcorp Alaska, LLC
Sr. Geotechnician 3800 Centerpoint Drive, Suite 1400
Anchorage, AK 99503
Tele: (907) 777-8337
E-mail: david.douglas@hilcorp.com
Please acknowledge receipt by signing and returning one copy of this transmittal.
Received By: Date:
Date: 11/13/2025
To: Alaska Oil & Gas Conservation Commission
Natural Resource Technician
333 W 7th Ave Suite 100
Anchorage, AK 99501
SFTP DATA TRANSMITTAL T#20251113
Well API #PTD #Log Date Log Company Log Type AOGCC
E-Set#
OP08-04 50029234247000 210041 06/12/2013 SCHLUMBERGER USIT
OP14-S03 50029234470000 211052 09/26/2013 SCHLUMBERGER CBL/USIT
SI29-S02 50629234640000 213006 02/29/2012 SCHLUMBERGER SONIC VISION - TOC
SP24-SE1 50629235100000 214011 03/19/2014 HALLIBURTON CAST-M/CBL-M/ACE
Please include current contact information if different from above.
T41096
T41097
T41098
T41099
212-006
SP24-SE1 50629235100000 214011 03/19/2014 HALLIBURTON CAST-M/CBL-M/ACE
Gavin Gluyas Digitally signed by Gavin Gluyas
Date: 2025.11.13 13:15:44 -09'00'
STATE OF ALASKA
OIL AND GAS CONSERVATION COMMISSION Reviewed By:'
P.I. Supry
BOPE Test Report for: NIKAITCHUQ SP24-SEI i Comm
Contractor/Rig No.: Doyon 15 -
Operator: Eni US Operating Company Inc
Type Operation: WRKOV Sundry No:
Type Test: [NIT 321-283 -
PTD#: 2140110 ' DATE: 6/17/2021 -
Operator Rep: Lawrance
Test Pressures:
Rams: Annular: Valves: MASP:
250/3500 ' 250/3500 - 250/3500 - 808 '
TEST DATA
Inspector Bob Noble -
Rig Rep: Pankratz
Insp Source
Inspector
Inspection No: bopRCN210619094940
Related Insp No:
MISC. INSPECTIONS:
MUD SYSTEM:
ACCUMULATOR SYSTEM:
Upper Kelly
1
P/F
Lower Kelly
Visual
Alarm
Time/Pressure P/F
Location Gen.:
P
Trip Tank
P
P
System Pressure 3050 -
P
Housekeeping:
P
Pit Level Indicators
P
P
Pressure After Closure 2150
P
PTD On Location
P
Flow Indicator
P
P
200 PSI Attained 11
P
Standing Order Posted
P
Meth Gas Detector
P
P
Full Pressure Attained 61
P
Well Sign
P
H2S Gas Detector
P
P "
Blind Switch Covers: All stations
P
Drl. Rig
_P_-
MS Misc
-NA
NA
Nitgn. Bottles (avg): 10 &_4000_-
P -
Hazard Sec.
P_
P-
Inside Reel Valves -__ 0
NA
ACC Misc 0
NA
Misc
NA
Check Valve
0
NA
FLOOR SAFTY VALVES:
BOP STACK:
Quantity
P/F
Upper Kelly
1
P .
Lower Kelly
l -_ _
P _
Ball Type
2
P
Inside BOP
2
P
FSV Misc
0
NA
BOP STACK:
CHOKE MANIFOLD:
Quantity Size
P/F
Quantity
P/F
Stripper
0
NA
No. Valves 15
-P--
Annular Preventer
1, 13 3/8"
P-
Manual Chokes 1
P,
#1 Rams
__1 ' 4 1/2" X711
P_-
Hydraulic Chokes 1
P
#2 Rams
1 Blind/Shear
P -
CH Misc 0
NA
#3 Rams _
1 - 3 1/2" x-6"
P
#4 Rams
0
NA
#5 Rams
0
NA
INSIDE REEL VALVES:
#6 Rams
0 _
NA
(Valid for Coil Rigs Only)
Choke Ln. Valves _
_ 2- 31/8
P-
Quantity
P/F
HCR Valves
4 - 3 1/8"
P-
Inside Reel Valves -__ 0
NA
Kill Line Valves
2 - 3 1/8"
P --
-Check
Check Valve
0
NA
BOP Misc
0
NA
Number of Failures: 0 / Test Results
Remarks: Very good test.
Test Time 7
1. Operations Abandon Plug Perforations Fracture Stimulate Pull Tubing Operations shutdown
Performed: Suspend Perforate Other Stimulate Alter Casing Change Approved Program
Plug for Redrill Perforate New Pool Repair Well Re-enter Susp Well Other: ESP Changeout_
Development Exploratory
Stratigraphic Service 6. API Number:
7. Property Designation (Lease Number):8. Well Name and Number:
9. Logs (List logs and submit electronic data per 20AAC25.071):10. Field/Pool(s):
11. Present Well Condition Summary:
Total Depth measured 15,240 feet N/A feet
true vertical 4,015 feet N/A feet
Effective Depth measured 15,236 feet N/A feet
true vertical 4,015 feet N/A feet
Perforation depth Measured depth 5237-15236 feet
True Vertical depth 3,916-4,015 feet
Tubing (size, grade, measured and true vertical depth)4.5 L-80 4759' 3,781'
Packers and SSSV (type, measured and true vertical depth)N/A N/A N/A N/A
12. Stimulation or cement squeeze summary:N/A
Intervals treated (measured):
Treatment descriptions including volumes used and final pressure:N/A
13.
Prior to well operation:
Subsequent to operation:
15. Well Class after work:
Daily Report of Well Operations Exploratory Development Service Stratigraphic
Copies of Logs and Surveys Run 16. Well Status after work: Oil Gas WDSPL
Electronic Fracture Stimulation Data GSTOR GINJ SUSP SPLUG
Sundry Number or N/A if C.O. Exempt:
Contact Name:
Authorized Title:
Contact Email:
7/14/2021 Contact Phone:
Eni US Operating Co. Inc.
Stefano Pierfelici
Well Operations project Manager
Amjad Chaudhry
amjad.chaudhry@eni.com
907-865-3379
WINJ WAG
23
Water-Bbl
MD
160
2900
1279
Oil-Bbl
measured
true vertical
Packer
3700 Centerpoint dr Suite 500, Anchorage, AK,
99503
3. Address:
4. Well Class Before Work:
314
Representative Daily Average Production or Injection Data
164601
Casing Pressure Tubing Pressure
ADL 0391283, 0388583,0390616, 0390615
132
20
SP24-SE1
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
REPORT OF SUNDRY WELL OPERATIONS
214-011
50-62923510-00-00
N/A
14. Attachments (required per 20 AAC 25.070, 25.071, & 25.283)
725
Gas-Mcf
measuredPlugs
Junk measured
5. Permit to Drill Number:
51
17. I hereby certify that the foregoing is true and correct to the best of my knowledge.
321-283
148
Size
Nikaitchuq Scharader Bluff Oil
Conductor
Surface
Intermediate
Production
Authorized Signature with date:
Authorized Name:
Liner
Length
160
2900
5237
10102
Casing
Structural
20
13.375
9.625
5.5
5237
15236
TVD
160
2449
3917
4015 slotted
Burst
5,210
6,890
2. Operator Name
Senior Engineer:Senior Res. Engineer:
slotted
Collapse
2,480
4,790
t
Fra
O
6. A
G
L
PG
,
R
_
Form 10-404 Revised 3/2020 Submit Within 30 days of Operations
By Samantha Carlisle at 10:00 am, Jul 14, 2021
Digitally signed by: Stefano Pierfelici
DN: CN = Stefano Pierfelici C = AD
Date: 2021.07.14 09:44:55 -08'00'
Stefano
Pierfelic
i
VTL 8/9/21
50-629-23510-00-00
SFD
RBDMS HEW 7/14/2021
SFD 7/16/2021DSR-7/14/21
Surface to ~500', 4-½” 12.6 ppf TK-15 Internal Coated NEWProduction Tubing, from 500' to ESP TK-15 Internal Coatedinspected tubing.HAL 5-½” Oil Swell Packer4-½” x-cplg cable clamps, for ESPPower Cable, (1) 3/8" Chem Inj LineSP24-SE1Dual Lateral Producerwith ESP LiftNikaitchuq Field–Spy Island5-½” Silver Bullet Ecc.Nose Guide ShoeAs Completed06/19/ 2021Interm. Casing9-5/8", 40#5,237' MD, 3,916' TVD79º Inc.Slotted Liner,5-½” 15.5 ppf15,236' MD, 4,015' TVD92º Inc.5,134' MD,3,891' TVD -Baker SLXPLiner Hanger/PackerSurf. Casing13-3/8", 68 #2,900' MD, 2,449'TVD30º Inc.4,795' MD, 3,787' TVD, 71º Inc–Centrilift Flex 27, 82 stages4,761' MD, 3,781' TVD–Zenith Ported Discharge Sub4,865' MD, 3,812'TVD–L1 - BakerSLXP LinerHanger/Packer5-½” Silver Bullet Ecc.Nose Guide Shoe withBent JointHAL 5-½” Oil Swell PackerSlotted Liner,5-½” 15.5 ppf15,210' MD, 4,010'TVD89º Inc.Item (Upper Lateral) MD (ft)5 1/2" Oil Swell Pck #1 14,748 5 1/2" Oil Swell Pck #2 12,480 5 1/2" Oil Swell Pck #3 10,896 5 1/2" Oil Swell Pck #4 9,516 5 1/2" Oil Swell Pck #5 8,165 5 1/2" Oil Swell Pck #6 6,819 5 1/2" Oil Swell Pck #7 5,442 5 1/2" Oil Swell Pck #8 5,117 Item (Lower Lateral) MD (ft)5 1/2" Oil Swell Pck #1 14,281 5 1/2" Oil Swell Pck #2 13,877 5 1/2" Oil Swell Pck #3 13,513 5 1/2" Oil Swell Pck #4 12,712 5 1/2" Oil Swell Pck #5 11,071 5 1/2" Oil Swell Pck #6 10,067 5 1/2" Oil Swell Pck #7 6,882 4,838' MD, Bottom of shroud
:HOO1DPH636(25
:HOOERUH1DPH636(
:HOO&RGH
-RE:25.29(5
:&(,/(9(/
'DLO\5HSRUW
'DWH
5HSRUW
3DJHRI
:HOO+HDGHU
3HUPLW&RQFHVVLRQ1
$'/
2SHUDWRU
(1,3(752/(80
6XEVLGLDU\
(1,3HWUROHXP&R,QF
,QLWLDO/DKHH&RGH
5RWDU\7DEOH(OHYDWLRQIW
*URXQG/HYHOIW
)LUVW)ODQJHIW
5.%%DVH)ODQJHIW
5.%7XELQJ6SRROIW
5LJV
5LJ1DPH
5,*
&RQWUDFWRU
'2<21
5LJ7\SH
/$1'5,*
5LJ1XP
5LJ6WDUW'DWH
5LJ5HOHDVH'DWH
'DLO\,QIRUPDWLRQ
:HDWKHU
&OHDU
7HPSHUDWXUH)
:LQG
(#03+
'D\V/7,GD\V 'D\V5,GD\V 32%
6DIHW\,QFLGHQWV1HDU0LVV
'DWH
&DWHJRU\ 7\SH 6XEW\SH 6HYHULW\ &DXVH /RVWWLPH"
1R
&RPPHQW
=HUR+6(,QFLGHQWV5HYLHZHGWKH&
VZLWKDIRFXVRQ&XOWXUH5HYLHZHG(QL*ROGHQ5XOHVZLWKDIRFXVRQ:DVWH0DQDJHPHQW&RQGXFWHG6WRS:RUN$XWKRULW\GULOOZLWK:,)SHUVRQQHODQG:RUOH\FUDQHFUHZ
6DIHW\'ULOOV
7\SH 2FFXU /DVW'DWH 1H[W'DWH
'D\V8QWLO1H[W&KHFN
GD\V
5LJ,QVSHFWLRQ
6DIHW\0HHWLQJ
6WRS:RUN$XWKRULW\'ULOO
77.LFN:KLOH7ULSSLQJ'ULOO
&DVLQJVVHDW
&DV7\SH 2'LQ ,'LQ *UDGH 7RSIW.% %RWWRPIW.% 79'%RWIW.% /DQGLQJ'DWH
&$6,1* ;
&$6,1* /
&$6,1* /
/,1(5 /
/DVW&HPHQWLQJ
&HPHQWLQJ6WDUW'DWH6WULQJ&$6,1*IW.%&RPPHQW
6WJ 7RSIW.% 7RS0HDV0HWK %WPIW.% &RP
6RQLF 37OLQHVSVL3XPSEEOVSSJ0XG3XVK#ESPSVL%WP3OXJEEOVRISSJ/HDG
FPW#ESPSVLEEOVRISSJ7DLOFPW#ESPSVL7RS3OXJEEOV):EEOVRI
SSJ/61'PXG#ESPSVL%XPSHG3OXJDQGSUHVVXUHXSWRSVLIRUPLQ)ORDWVKHOG&,3#
KUV
-RE,QIRUPDWLRQ
-RE3KDVH
:25.29(5
3ODQQHG6WDUW'DWH
6WDUW'DWH
(QG'DWH 3'XUDWLRQGD\V
'DLO\6XPPDU\2SHUDWLRQV
K)RUHFDVW
&RPSOHWH1LSSOHXSRI%23(7HVWKLJKSUHVVXUHOLQHV3HUIRUPVKHOOWHVW3HUIRUP%23WHVWZLWKò´DQG´WHVWMRLQWVZLWK$2*&&%RE1REOHWRZLWQHVV%23WHVW5LJXS%DNHUFHQWHUOLIWDQG*%53XOOWXELQJ
KDQJHUDQGVWDUWSXOOWXELQJ
K6XPPDU\
6SRWSXPS$FFXPXODWRUKRXVHPXGPDQVKDFNDQGFUDQHLQSODFH+DOOLEXUWRQORJJLQJXQLW&RPSOHWHEHUPVDQGULJXS7HVWOLQHVDQGWDNHRQSSJ.&/1D&/EULQHZLWKELRFLGH.LOOZHOODQGPRQLWRU
&RQGXFW6:$'ULOOZLWK0,6ZDFR:,)SHUVRQQHO :RUOH\FUDQHFUHZ6HW%39DQGQLSSOHGRZQWUHH1LSSOHXS%23($GGLQJ%3+RISSJ.&/1D&/EULQHZLWKELRFLGH
2SHUDWLRQDW
7HVWLQJ%23
V
7LPH/RJ
6WDUW
7LPH
(QG
7LPH 'XUKU
&XP'XU
KU3KDVH 2SU $FW 3ODQ 2SHU'HVFU
:2 $ 3 0DNHXSLQWHUFRQQHFWVVSRWDQGSOXJLQWRSGULYHFDEOHVLQVWDOODQGFRQQHFWVXLWFDVHVDQGKRVHV6SRWSXPSZLWKWKH
SLSHVKHGDQGLQVWDOOODQGLQJVDWDOOH[LWV%HUPULJVSRWPXGODEDQGFXWWLQJVWDQN6SRWDFFXPXODWRUDQGEHUPLQVDPHOD\
RXWDFFXPXODWRUOLQHVDQGUXQIURPDFFXPXODWRUEXLOGLQJWRULJ
:2 $ 3 7HVWOLQHVIURPULJWRPXGSODQWDQGORDGSLWVZLWK33*.&/1D&OEULQHLQKLELWHGZLWKELRFLGH5XQ´KLJKSUHVVXUH
OLQHVWRWXELQJDQG$DQQXOXVIRUZHOONLOORSHUDWLRQV&RQQHFWSRZHUOLQHVIRUPXGSXPSSRZHUXSWRSGULYHDQGWHVWDOO
IXQFWLRQV0RYHPXGORJJHUVVKDFNLQSODFHZLWKFUDQH&RQGXFWD6:$GULOOZLWK:RUOH\FUDQHFUHZ
:2 0 3 7HVW´KLJKSUHVVXUHOLQHVJRLQJWRWXELQJDQG$DQQXOXVWR36,DOOJRRGULJXSEOHHGWUDLOHUWR%DQQXOXV3HUIRUPZHOO
NLOORSHUDWLRQVEXOOKHDG%%/RI33*.&/1D&OEULQHZLWKELRFLGHGRZQWXELQJDW%30UDWHZLWKLQLWLDOSUHVVXUH
RI36,DQGILQDOSUHVVXUHRI36,1RWHPD[SUHVVXUHVHHQZDV36,%XOOKHDGHG%%/RI33*
.&/1D&OLQKLELWHGZLWKELRFLGHGRZQ$DQQXOXVDW%30ZLWKDQLQLWLDOSUHVVXUHRI36,DQGDILQDOSUHVVXUHRI36,
1RWHPD[SUHVVXUHVHHQZDV36,7KH%DQQXOXVKDGDQGLQLWLDOSUHVVXUHRI36,DQGWKURXJKRXWWKHZHOONLOOWKH
SUHVVXUHZRXOGULVHWR36,ZHUHLWZDVEOHGEDFNWR36,WRWKHEOHHGWDQN7KLVZDVUHSHDWHGWLPHV&RQGXFW
6:$'ULOOZLWK0,6ZDFR:,)SHUVRQQHO
:2 0 3 0RQLWRUHGSUHVVXUHZLWK$DQQXOXVSUHVVXUHIDOOLQJWRYDFXXPWXELQJKDGOHVVWKDQ36,JDVFDSWKDWZDVEOHGRII
FRQWLQXHGWRPRQLWRUZHOOIRUDQKRXUZLWKQRSUHVVXUHLQFUHDVH
:2 & 3 6HW%39UHPRYHWUHHLQVSHFWWXELQJKDQJHU7HUPLQDWHFDSWXEH,QVWDOOWHVWGDUW&RQWLQXHWRORDGFRPSOHWLRQWXELQJLQWR
SLSHVKHG
:2 & 3 1LSSOHXSKLJKSUHVVXUHULVHUDQG%23VWDFN3ULPDU\DQGVHFRQGDU\0DQXDODQG+&5NLOOYDOYHV1LSSOHXSKLJKSUHVVXUH
KRVHVRQSULPDU\DQGVHFRQGDU\NLOO%HOOQLSSOHIORZOLQHNRRP\OLQHVWRVWDFNDQGFHOODUGUDLQV&OHDQDQGLQVSHFWDOOER[
HQGVRQ´WXELQJLQSLSHVKHG
1RWH)OXLGORVVWRZHOO
7RGD\EEOV33*.&/1D&OEULQHLQKLELWHGZLWKELRFLGH
7RWDO/RVVHVWR+ROH
%%/633*.&/1D&OEULQHLQKLELWHGZLWKELRFLGH
*DV5HDGLQJV
$YJ%DFNJURXQG*DV 0D[%DFNJURXQG*DV $YJ&RQQHFWLRQ*DV 0D[&RQQHFWLRQ*DV
$YJ'ULOO*DV 0D['ULOO*DV $YJ7ULS*DV 0D[7ULS*DV
'DLO\0XG9ROXPHV
7DQN$GGLWLRQ/RVV 7\SH 'HV 9ROXPHEEO
7DQN
+ROH
/RVV
&XPXODWLYH0XG9ROXPHV
$FWLYH9ROXPHEEO
+ROH9ROXPHEEO
$GGLWLRQVEEO
&XP$GGLWLRQVEEO
/RVVHVEEO
&XP/RVVHVEEO
'DLO\&RQWDFWV
3RVLWLRQ &RQWDFW1DPH &RPSDQ\ 7LWOH (PDLO 2IILFH 0RELOH
(QLUHSUHVHQWDWLYH 6WHYH/DZUHQFH $65&(QHUJ\6HUYLFHV 'ULOOLQJ6XSY VLGGULOOLQJ#HQLFRP
:HOO1DPH636(25
:HOOERUH1DPH636(
:HOO&RGH
-RE:25.29(5
:&(,/(9(/
'DLO\5HSRUW
'DWH
5HSRUW
3DJHRI
'DLO\&RQWDFWV
3RVLWLRQ &RQWDFW1DPH &RPSDQ\ 7LWOH (PDLO 2IILFH 0RELOH
(QLUHSUHVHQWDWLYH 0LNH*UXEE $65&(QHUJ\6HUYLFHV 'ULOOLQJ6XSY VLGGULOOLQJ#HQLFRP
(QLUHSUHVHQWDWLYH 0LWFK%LOOLQJWRQ $65&(QHUJ\6HUYLFHV 5LJ&OHUN $.5LJ&OHUNV'R\RQ#HQLFRP
6DIHW\5HSUHVHQWDWLYH 3DW$KHUQ %HDFRQ +6( 3DWULFN$KHUQ#H[WHUQDOHQLFRP
7RRO3XVK 9LNWRU7RUUHV 'R\RQ'ULOOLQJ 7RRO3XVKHU ULJ#GR\RQGULOOLQJFRP
7RRO3XVK $QGUHZ<RFKXP 'R\RQ'ULOOLQJ 7RXU3XVKHU ULJ#GR\RQGULOOLQJFRP
6DIHW\5HSUHVHQWDWLYH +DUROG5LFKDUGVRQ 'R\RQ'ULOOLQJ +6( KULFKDUGVRQ#GR\RQGULOOLQJFRP
6DIHW\5HSUHVHQWDWLYH 'DYH6HQD 'R\RQ'ULOOLQJ +6( GVHQD#GR\RQGULOOLQJFRP
3HUVRQQHO/RJ32%
&RPSDQ\ 6HUY7\SH :RUN+KU 6WDQGE\+KU &RXQW 1RWH
%DNHU+XJKHV &HQWULOLIW
%DNHU+XJKHV &RPSOHWLRQV)LVKLQJ
+$//,%85721 (OLQH6OLFNOLQH
6&+/80%(5*(5 &HPHQW
:HOO7HF 7UDFWRU
/LWWOH5HG6HUYLFHV 3XPSLQJ6HUYLFH
6&+/80%(5*(5 &RPSOHWLRQV
$65&(QHUJ\6HUYLFHV 5LJFOHUN
$65&(QHUJ\6HUYLFHV 62$
$65&(QHUJ\6HUYLFHV /LIW$GYLVRU
&203(7(17,$ )XHOHU
9DXOW :HOOKHDG
6XSHULRU 7KUHDG5HS
$65&(QHUJ\6HUYLFHV &RPSDQ\PDQ
+$//,%85721 0XG/RJJHUV
6&+/80%(5*(5 6/%0,6ZDFR0XG(QJLQHHU
6&+/80%(5*(5 6/%:,)
6&+/80%(5*(5 6/%0,6ZDFR0XGSODQW
:25/(< 5LJ6XSSRUW
'2<21 2QVKRUH5LJ
%236WDFN &RPSRQHQWV
'HVFULSWLRQ
%236WDFN
6WDUW'DWH
/DVW&HUWLILFDWLRQ'DWH
3UHVVXUH5DWLQJSVL
7\SH 0DNH 0RGHO ,'1RPLQ 35DQJHSVL /DVW&HUW'DWH
$QQXODU +\GULO *.
[9%5V +\GULO 03/
%OLQG6KHDU5DP +\GULO 03/
[9%5V +\GULO 03/
6ORZ&LUFXODWLRQ5DWHV
3XPS1XPEHU0DNH:KLWH6WDU 0RGHO4XDWUR
6WDUW'DWH
(QG'DWH /LQHU6L]HLQ
9ROXPH3HU6WURNH2YHUULGHEEOVWN
0D[3UHVVXUHSVL
'DWH 'HSWKIW.% 6ORZ6SG 6WURNHVVSP 3SVL (II 4)ORZJSP
3XPS1XPEHU0DNH:KLWH6WDU 0RGHO4XDWUR
6WDUW'DWH
(QG'DWH /LQHU6L]HLQ
9ROXPH3HU6WURNH2YHUULGHEEOVWN
0D[3UHVVXUHSVL
'DWH 'HSWKIW.% 6ORZ6SG 6WURNHVVSP 3SVL (II 4)ORZJSP
3XPS1XPEHU0DNH1DWLRQDO6XSSO\0RGHO3
6WDUW'DWH
(QG'DWH /LQHU6L]HLQ
9ROXPH3HU6WURNH2YHUULGHEEOVWN
0D[3UHVVXUHSVL
'DWH 'HSWKIW.% 6ORZ6SG 6WURNHVVSP 3SVL (II 4)ORZJSP
'DLO\%XON
6XSSO\,WHP'HVFULSWLRQ(TXLSPHQW)XHO 8QLW/DEHOJDOXV 8QLW6L]H1RWH
'DWH
&RQVXPHG
5HFHLYHG
5HWXUQHG &XP&RQVXPHG
&XP5HFHLYHG
&XP5HWXUQHG
&XP2Q/RF
1RWH
6XSSO\,WHP'HVFULSWLRQ0XG3ODQW%RLOHUV 8QLW/DEHOJDOXV 8QLW6L]H1RWH
'DWH
&RQVXPHG
5HFHLYHG
5HWXUQHG &XP&RQVXPHG
&XP5HFHLYHG
&XP5HWXUQHG
&XP2Q/RF
1RWH
6XSSO\,WHP'HVFULSWLRQ5LJ)XHO 8QLW/DEHOJDOXV 8QLW6L]H1RWH
'DWH
&RQVXPHG
5HFHLYHG
5HWXUQHG &XP&RQVXPHG
&XP5HFHLYHG
&XP5HWXUQHG
&XP2Q/RF
1RWH
6XSSO\,WHP'HVFULSWLRQ5LJ:DWHU 8QLW/DEHOEEO 8QLW6L]H1RWH
'DWH
&RQVXPHG
5HFHLYHG
5HWXUQHG &XP&RQVXPHG
&XP5HFHLYHG
&XP5HWXUQHG
&XP2Q/RF
1RWH
6XSSO\,WHP'HVFULSWLRQ:,)%RLOHUV 8QLW/DEHOJDOXV 8QLW6L]H1RWH
'DWH
&RQVXPHG
5HFHLYHG
5HWXUQHG &XP&RQVXPHG
&XP5HFHLYHG
&XP5HWXUQHG
&XP2Q/RF
1RWH
/DVW$XWKRULW\9LVLW
'DWH 7RWLQVS1EU 7RWDO,1&QXPEHU &RPPHQW
6723&DUGV6XEPLWWHG
&RPSDQ\ 5SWV &RP
'R\RQ'ULOOLQJ,QF 2EVHUYDWLRQ
'R\RQ'ULOOLQJ,QF +D]DUG,'
'R\RQ'ULOOLQJ,QF 6WRS:RUN
'R\RQ'ULOOLQJ,QF3-60
V
0,6ZDFR 2EVHUYDWLRQ
:RUOH\ +D]DUG,'
:RUOH\ 6WRS:RUN
:RUOH\ 2EVHUYDWLRQ
*HQHUDO1RWHV
&RPPHQW
:HOO1DPH636(25
:HOOERUH1DPH636(
:HOO&RGH
-RE:25.29(5
:&(,/(9(/
'DLO\5HSRUW
'DWH
5HSRUW
3DJHRI
:HOO+HDGHU
3HUPLW&RQFHVVLRQ1
$'/
2SHUDWRU
(1,3(752/(80
6XEVLGLDU\
(1,3HWUROHXP&R,QF
,QLWLDO/DKHH&RGH
5RWDU\7DEOH(OHYDWLRQIW
*URXQG/HYHOIW
)LUVW)ODQJHIW
5.%%DVH)ODQJHIW
5.%7XELQJ6SRROIW
5LJV
5LJ1DPH
5,*
&RQWUDFWRU
'2<21
5LJ7\SH
/$1'5,*
5LJ1XP
5LJ6WDUW'DWH
5LJ5HOHDVH'DWH
'DLO\,QIRUPDWLRQ
:HDWKHU
&OHDU
7HPSHUDWXUH)
:LQG
(1(#03+
'D\V/7,GD\V 'D\V5,GD\V 32%
6DIHW\,QFLGHQWV1HDU0LVV
'DWH
&DWHJRU\ 7\SH 6XEW\SH 6HYHULW\ &DXVH /RVWWLPH"
1R
&RPPHQW
=HUR+6(,QFLGHQWV5HYLHZHGWKH&
VZLWKDIRFXVRQ&XOWXUH5HYLHZHG(QL*ROGHQ5XOHVZLWKDIRFXVRQ:DVWH0DQDJHPHQW&RQGXFW6WRS:RUN$XWKRULW\'ULOOLQPXGSODQW
6DIHW\'ULOOV
7\SH 2FFXU /DVW'DWH 1H[W'DWH
'D\V8QWLO1H[W&KHFN
GD\V
$FFXPXODWRUGULOO
$XWKRULW\9LVLW
%237HVWSUHVVXUH
5LJ,QVSHFWLRQ
6DIHW\0HHWLQJ
6SLOO'ULOO
6WRS:RUN$XWKRULW\'ULOO
77.LFN:KLOH7ULSSLQJ'ULOO
&DVLQJVVHDW
&DV7\SH 2'LQ ,'LQ *UDGH 7RSIW.% %RWWRPIW.% 79'%RWIW.% /DQGLQJ'DWH
&$6,1* ;
&$6,1* /
&$6,1* /
/,1(5 /
/DVW&HPHQWLQJ
&HPHQWLQJ6WDUW'DWH6WULQJ&$6,1*IW.%&RPPHQW
6WJ 7RSIW.% 7RS0HDV0HWK %WPIW.% &RP
6RQLF 37OLQHVSVL3XPSEEOVSSJ0XG3XVK#ESPSVL%WP3OXJEEOVRISSJ/HDG
FPW#ESPSVLEEOVRISSJ7DLOFPW#ESPSVL7RS3OXJEEOV):EEOVRI
SSJ/61'PXG#ESPSVL%XPSHG3OXJDQGSUHVVXUHXSWRSVLIRUPLQ)ORDWVKHOG&,3#
KUV
-RE,QIRUPDWLRQ
-RE3KDVH
:25.29(5
3ODQQHG6WDUW'DWH
6WDUW'DWH
(QG'DWH 3'XUDWLRQGD\V
'DLO\6XPPDU\2SHUDWLRQV
K)RUHFDVW
&RQWLQXHWRSXOORXWRIKROHOD\LQJGRZQ´/SSI+<'WXELQJIURP¶WRVXUIDFH/RDGSLSHVKHGZLWK77GULOOSLSHUXQLQKROHDQGSHUIRUPFDVLQJWHVWSXOORXWRIKROHOD\LQJGRZQ
GULOOSLSH5LJXSDQGUXQLQKROHZLWKFRPSOHWLRQ
K6XPPDU\
&RPSOHWH%23QLSSOHXS7HVW%23(SVLZLWQHVVHGE\%RE1REOHRI$2*&&DOOWHVWZHUHJRRG5LJXSIRUGHFRPSOHWLRQ3XOORXWRIKROHIURPVXUIDFHWR
0'3XPS%3+RI33*
.&/1D&OEULQHZLWKELRFLGHGRZQ$DQQXOXV
)RXQGKROHVLQWXELQJ
2SHUDWLRQDW
/RDGLQJ77GULOOSLSHLQSLSHVKHGSUHSWRROVIRUFDVLQJWHVW
7LPH/RJ
6WDUW
7LPH
(QG
7LPH 'XUKU
&XP'XU
KU3KDVH 2SU $FW 3ODQ 2SHU'HVFU
:2 & 3 &RPSOHWH%23QLSSOHXS,QVWDOOWHVWMRLQWDQGULJXSWHVWHTXLSPHQW3XPS%3+RI33*.&/1D&OLQKLELWHGEULQH
GRZQ$DQQXOXV
:2 & 3 )ORRG%23VWDFNDQGFKRNHPDQLIROGSUHVVXUHXSDQGZRUNDLURXWRIV\VWHP3HUIRUPVKHOOWHVWZLWKò´WHVWMRLQWWR
36,3XPS%3+RI33*.&/1D&OLQKLELWHGZLWKELRFLGHGRZQ$DQQXOXV
:2 / 3 +DQJ(63VKHDYHVLQGHUULFNLQVWDOOHOHSKDQWWUXQNLQGHUULFNDQGVSRWVSRROLQJXQLW3XPS%3+RI33*
.&/1D&OEULQHLQKLELWHGZLWKELRFLGHGRZQ$DQQXOXV
:2 & 3 7HVW%23(SHU$2*&&VXQGU\36,ORZDQG36,KLJKIRUPLQXWHVFKDUWLQJHDFKWHVWDOOWHVWZHUHJRRG
3HUIRUPDFFXPXODWRUGUDZGRZQWHVWZLWKDVWDUWLQJDFFXPXODWRUSUHVVXUHRI36,DIWHUIXQFWLRQSUHVVXUH36,
36,UHFRYHU\VHFRQGVIXOOUHFRYHU\VHFRQGVDQGERWWOH1DYHUDJH36,1RWH%23WHVWZLWQHVVHGE\
$2*&&,QVSHFWRU0U%RE1REOH3XPS%3+RI33*.&/1D&OEULQHLQKLELWHGZLWKELRFLGHGRZQ$DQQXOXV
:2 & 3 5LJGRZQWHVWHTXLSPHQWSXOODQGOD\GRZQ9HWFRWHVWGDUWZLWKWHVWMRLQW3HUIRUP6:$GULOODW0XG3ODQW
:2 / 3 0DNHXSNLFNVWDQGMRLQW5LJXS*%5DQG%DNHU&HQWHUOLIW0RELOL]H&RPSOHWLRQ%+$WRVKRUWVLGHRISLSHVKHG3XOOQHZ
%+$RIER[HVWRSUHSIRUGHFRPSOHWLRQRISXOOHG%+$3XPS%3+RI33*.&/1D&OEULQHLQKLELWHGZLWKELRFLGH
GRZQ$DQQXOXV
:2 / 3 3XOO%39,QVWDOOODQGLQJMRLQWDQGSXOOKDQJHUWRNVODFNRIIWRWRSGULYHZHLJKWSXOOXSWRNDQGKDQJHUSXOOHGIUHH
3XOOKDQJHUWRULJIORRU38 .3XOORXWRIKROHIURP¶WRSXOOLQJWXELQJKDQJHUWRIORRU7HUPLQDWHFDSWXEHDQG
(63FDEOHIURPWXELQJKDQJHUSUHSDUHWRUXQOLQHVWKURXJKVKHDYH3XPS%3+RI33*.&/1D&OEULQHLQKLELWHG
ZLWKELRFLGHGRZQ$DQQXOXV
:2 / 3 3XOORXWRIKROHIURP¶WR¶3XPS%3+RI33*.&/1D&OEULQHLQKLELWHGZLWKELRFLGHGRZQ$DQQXOXV
:2 . 3 5LJXSDQGFLUFXODWHVWULQJYROXPHRIEEOVDW%30SVL3XPS%3+RI33*.&/1D&OEULQHLQKLELWHGZLWK
ELRFLGHGRZQ$DQQXOXV
:2 / 3 &RQWLQXHWRSXOORXWRIKROHOD\LQJGRZQ´/SSI+<'WXELQJIURP¶WR¶3XPS%3+RI33*
.&/1D&OEULQHLQKLELWHGZLWKELRFLGHGRZQ$DQQXOXV
1RWH+ROHVLQWXELQJ
VWKROH¶)URPVXUIDFH´ZLGH;ò´ORQJ
QGKROH¶IURPVXUIDFHó´ZLGH[ô´ORQJ
1RWH)OXLGORVVWRZHOO
7RGD\EEOV
7RWDO/RVVHVWR+ROH
%%/633*.&/1D&OEULQHLQKLELWHGZLWKELRFLGH
*DV5HDGLQJV
$YJ%DFNJURXQG*DV 0D[%DFNJURXQG*DV $YJ&RQQHFWLRQ*DV 0D[&RQQHFWLRQ*DV
$YJ'ULOO*DV 0D['ULOO*DV $YJ7ULS*DV 0D[7ULS*DV
:HOO1DPH636(25
:HOOERUH1DPH636(
:HOO&RGH
-RE:25.29(5
:&(,/(9(/
'DLO\5HSRUW
'DWH
5HSRUW
3DJHRI
'DLO\0XG9ROXPHV
7DQN$GGLWLRQ/RVV 7\SH 'HV 9ROXPHEEO
7DQN
+ROH
/RVV
&XPXODWLYH0XG9ROXPHV
$FWLYH9ROXPHEEO
+ROH9ROXPHEEO
$GGLWLRQVEEO
&XP$GGLWLRQVEEO
/RVVHVEEO
&XP/RVVHVEEO
'DLO\&RQWDFWV
3RVLWLRQ &RQWDFW1DPH &RPSDQ\ 7LWOH (PDLO 2IILFH 0RELOH
(QLUHSUHVHQWDWLYH 6WHYH/DZUHQFH $65&(QHUJ\6HUYLFHV 'ULOOLQJ6XSY VLGGULOOLQJ#HQLFRP
(QLUHSUHVHQWDWLYH 0LNH*UXEE $65&(QHUJ\6HUYLFHV 'ULOOLQJ6XSY VLGGULOOLQJ#HQLFRP
(QLUHSUHVHQWDWLYH 0LWFK%LOOLQJWRQ $65&(QHUJ\6HUYLFHV 5LJ&OHUN $.5LJ&OHUNV'R\RQ#HQLFRP
6DIHW\5HSUHVHQWDWLYH 3DW$KHUQ %HDFRQ +6( 3DWULFN$KHUQ#H[WHUQDOHQLFRP
7RRO3XVK 5\DQ3DQNUDW] 'R\RQ'ULOOLQJ 7RRO3XVKHU ULJ#GR\RQGULOOLQJFRP
7RRO3XVK $QGUHZ<RFKXP 'R\RQ'ULOOLQJ 7RXU3XVKHU ULJ#GR\RQGULOOLQJFRP
6DIHW\5HSUHVHQWDWLYH +DUROG5LFKDUGVRQ 'R\RQ'ULOOLQJ +6( KULFKDUGVRQ#GR\RQGULOOLQJFRP
6DIHW\5HSUHVHQWDWLYH 'DYH6HQD 'R\RQ'ULOOLQJ +6( GVHQD#GR\RQGULOOLQJFRP
3HUVRQQHO/RJ32%
&RPSDQ\ 6HUY7\SH :RUN+KU 6WDQGE\+KU &RXQW 1RWH
%DNHU+XJKHV &RPSOHWLRQV)LVKLQJ
+$//,%85721 (OLQH6OLFNOLQH
6&+/80%(5*(5 &HPHQW
:HOO7HF 7UDFWRU
/LWWOH5HG6HUYLFHV 3XPSLQJ6HUYLFH
6&+/80%(5*(5 &RPSOHWLRQV
$65&(QHUJ\6HUYLFHV 5LJFOHUN
$65&(QHUJ\6HUYLFHV 62$
$65&(QHUJ\6HUYLFHV /LIW$GYLVRU
&203(7(17,$ )XHOHU
9DXOW :HOOKHDG
6XSHULRU 7KUHDG5HS
$65&(QHUJ\6HUYLFHV &RPSDQ\PDQ
+$//,%85721 0XG/RJJHUV
6&+/80%(5*(5 6/%0,6ZDFR0XG(QJLQHHU
*%5 3LSHKDQGOLQJVHUYLFH
%DNHU+XJKHV &HQWULOLIW
6&+/80%(5*(5 6/%:,)
6&+/80%(5*(5 6/%0,6ZDFR0XGSODQW
:25/(< 5LJ6XSSRUW
'2<21 2QVKRUH5LJ
%236WDFN &RPSRQHQWV
'HVFULSWLRQ
%236WDFN
6WDUW'DWH
/DVW&HUWLILFDWLRQ'DWH
3UHVVXUH5DWLQJSVL
7\SH 0DNH 0RGHO ,'1RPLQ 35DQJHSVL /DVW&HUW'DWH
$QQXODU +\GULO *.
[9%5V +\GULO 03/
%OLQG6KHDU5DP +\GULO 03/
[9%5V +\GULO 03/
6ORZ&LUFXODWLRQ5DWHV
3XPS1XPEHU0DNH:KLWH6WDU 0RGHO4XDWUR
6WDUW'DWH
(QG'DWH /LQHU6L]HLQ
9ROXPH3HU6WURNH2YHUULGHEEOVWN
0D[3UHVVXUHSVL
'DWH 'HSWKIW.% 6ORZ6SG 6WURNHVVSP 3SVL (II 4)ORZJSP
3XPS1XPEHU0DNH:KLWH6WDU 0RGHO4XDWUR
6WDUW'DWH
(QG'DWH /LQHU6L]HLQ
9ROXPH3HU6WURNH2YHUULGHEEOVWN
0D[3UHVVXUHSVL
'DWH 'HSWKIW.% 6ORZ6SG 6WURNHVVSP 3SVL (II 4)ORZJSP
3XPS1XPEHU0DNH1DWLRQDO6XSSO\0RGHO3
6WDUW'DWH
(QG'DWH /LQHU6L]HLQ
9ROXPH3HU6WURNH2YHUULGHEEOVWN
0D[3UHVVXUHSVL
'DWH 'HSWKIW.% 6ORZ6SG 6WURNHVVSP 3SVL (II 4)ORZJSP
'DLO\%XON
6XSSO\,WHP'HVFULSWLRQ(TXLSPHQW)XHO 8QLW/DEHOJDOXV 8QLW6L]H1RWH
'DWH
&RQVXPHG
5HFHLYHG
5HWXUQHG &XP&RQVXPHG
&XP5HFHLYHG
&XP5HWXUQHG
&XP2Q/RF
1RWH
6XSSO\,WHP'HVFULSWLRQ0XG3ODQW%RLOHUV 8QLW/DEHOJDOXV 8QLW6L]H1RWH
'DWH
&RQVXPHG
5HFHLYHG
5HWXUQHG &XP&RQVXPHG
&XP5HFHLYHG
&XP5HWXUQHG
&XP2Q/RF
1RWH
6XSSO\,WHP'HVFULSWLRQ5LJ)XHO 8QLW/DEHOJDOXV 8QLW6L]H1RWH
'DWH
&RQVXPHG
5HFHLYHG
5HWXUQHG &XP&RQVXPHG
&XP5HFHLYHG
&XP5HWXUQHG
&XP2Q/RF
1RWH
6XSSO\,WHP'HVFULSWLRQ5LJ:DWHU 8QLW/DEHOEEO 8QLW6L]H1RWH
'DWH
&RQVXPHG
5HFHLYHG
5HWXUQHG &XP&RQVXPHG
&XP5HFHLYHG
&XP5HWXUQHG
&XP2Q/RF
1RWH
6XSSO\,WHP'HVFULSWLRQ:,)%RLOHUV 8QLW/DEHOJDOXV 8QLW6L]H1RWH
'DWH
&RQVXPHG
5HFHLYHG
5HWXUQHG &XP&RQVXPHG
&XP5HFHLYHG
&XP5HWXUQHG
&XP2Q/RF
1RWH
/DVW$XWKRULW\9LVLW
'DWH
7RWLQVS1EU 7RWDO,1&QXPEHU &RPPHQW
%237HVW$2*&&%RE1REOHZLWQHVVHG%23WHVW
6723&DUGV6XEPLWWHG
&RPSDQ\ 5SWV &RP
'R\RQ'ULOOLQJ,QF 2EVHUYDWLRQ
:HOO1DPH636(25
:HOOERUH1DPH636(
:HOO&RGH
-RE:25.29(5
:&(,/(9(/
'DLO\5HSRUW
'DWH
5HSRUW
3DJHRI
6723&DUGV6XEPLWWHG
&RPSDQ\ 5SWV &RP
'R\RQ'ULOOLQJ,QF 3-60
V
'R\RQ'ULOOLQJ,QF 6WRS:RUN
'R\RQ'ULOOLQJ,QF +D]DUG,'
+DOOLEXUWRQ 2EVHUYDWLRQ
0,6ZDFR 2EVHUYDWLRQ
0,6ZDFR 0HQWRULQJ
:RUOH\ 2EVHUYDWLRQ
:RUOH\ +D]DUG,'
:RUOH\ 6WRS:RUN
*HQHUDO1RWHV
&RPPHQW
:HOO1DPH636(25
:HOOERUH1DPH636(
:HOO&RGH
-RE:25.29(5
:&(,/(9(/
'DLO\5HSRUW
'DWH
5HSRUW
3DJHRI
:HOO+HDGHU
3HUPLW&RQFHVVLRQ1
$'/
2SHUDWRU
(1,3(752/(80
6XEVLGLDU\
(1,3HWUROHXP&R,QF
,QLWLDO/DKHH&RGH
5RWDU\7DEOH(OHYDWLRQIW
*URXQG/HYHOIW
)LUVW)ODQJHIW
5.%%DVH)ODQJHIW
5.%7XELQJ6SRROIW
5LJV
5LJ1DPH
5,*
&RQWUDFWRU
'2<21
5LJ7\SH
/$1'5,*
5LJ1XP
5LJ6WDUW'DWH
5LJ5HOHDVH'DWH
'DLO\,QIRUPDWLRQ
:HDWKHU
2YHUFDVW
7HPSHUDWXUH)
:LQG
1#03+
'D\V/7,GD\V 'D\V5,GD\V 32%
6DIHW\,QFLGHQWV1HDU0LVV
'DWH
&DWHJRU\ 7\SH 6XEW\SH 6HYHULW\ &DXVH /RVWWLPH"
1R
&RPPHQW
=HUR+6(,QFLGHQWV5HYLHZHGWKH&
VZLWKDIRFXVRQ&RPPXQLFDWLRQ5HYLHZHG(QL*ROGHQ5XOHVZLWKDIRFXVRQ&RQILQHG6SDFH
6DIHW\'ULOOV
7\SH 2FFXU /DVW'DWH 1H[W'DWH
'D\V8QWLO1H[W&KHFN
GD\V
$FFXPXODWRUGULOO
$XWKRULW\9LVLW
%237HVWSUHVVXUH
.LFN:KLOH7ULSSLQJ'ULOO
5LJ,QVSHFWLRQ
6DIHW\0HHWLQJ
6SLOO'ULOO
6WRS:RUN$XWKRULW\'ULOO
77.LFN:KLOH7ULSSLQJ'ULOO
&DVLQJVVHDW
&DV7\SH 2'LQ ,'LQ *UDGH 7RSIW.% %RWWRPIW.% 79'%RWIW.% /DQGLQJ'DWH
&$6,1* ;
&$6,1* /
&$6,1* /
/,1(5 /
/DVW&HPHQWLQJ
&HPHQWLQJ6WDUW'DWH6WULQJ&$6,1*IW.%&RPPHQW
6WJ 7RSIW.% 7RS0HDV0HWK %WPIW.% &RP
6RQLF 37OLQHVSVL3XPSEEOVSSJ0XG3XVK#ESPSVL%WP3OXJEEOVRISSJ/HDG
FPW#ESPSVLEEOVRISSJ7DLOFPW#ESPSVL7RS3OXJEEOV):EEOVRI
SSJ/61'PXG#ESPSVL%XPSHG3OXJDQGSUHVVXUHXSWRSVLIRUPLQ)ORDWVKHOG&,3#
KUV
-RE,QIRUPDWLRQ
-RE3KDVH
:25.29(5
3ODQQHG6WDUW'DWH
6WDUW'DWH
(QG'DWH 3'XUDWLRQGD\V
'DLO\6XPPDU\2SHUDWLRQV
K)RUHFDVW
)LQLVKULJXSDQGUXQLQKROHZLWKFRPSOHWLRQ
K6XPPDU\
3XOORXWRIKROHZLWK(63IURP¶OD\GRZQFRPSOHWLRQ5,+ZLWKFOHDQRXWDVVHPEO\WR¶ZRUNVFUDSHUSXOORXWRIKROHDQGOD\GRZQFOHDQRXWDVVHPEO\UXQLQKROHZLWKWHVWSDFNHUWR¶WHVWFDVLQJWR
36,JRRGWHVW5HOHDVHSDFNHUDQGSXOORXWRIKROH/D\LQJGRZQGULOOSLSHDQGOD\GRZQSDFNHU3XOOZHDUULQJ6WDUWULJJLQJXSWRUXQ&RPSOHWLRQ
2SHUDWLRQDW
0DNLQJXS(63DVVHPEO\
7LPH/RJ
6WDUW
7LPH
(QG
7LPH 'XUKU
&XP'XU
KU3KDVH 2SU $FW 3ODQ 2SHU'HVFU
:2 / 3 &RQWLQXHWRSXOORXWRIKROHZLWK(63FRPSOHWLRQIURP¶WRVXUIDFHFXW(63FDEOHDQGFDSLOODU\OLQHFKHFNHOHFWULFDO
PRWRUJURXQGHG/D\GRZQSXPSDQGPRWRUDVVHPEO\DORQJZLWK´VKURXG3XPS%3+RI.&/1D&OEULQH
LQKLELWHGZLWKELRFLGH
:2 / 3 3XOO(63FDEOHDQGFDSLOODU\OLQHVRYHUVKHDYHVDQGGRZQWRVSRROLQJXQLW&OHDUULJIORRURIROGFODPSVDQGRWKHU
PLVFHOODQHRXVSDUWVDQGULJGRZQSROOXWLRQKRVH3XPS%3+RI.&/1D&OEULQHLQKLELWHGZLWKELRFLGH1RWH
UHFRYHUHGFURVVFRXSOLQJFODPSVSURWHFWDOL]HUVDQGVSHFLDOW\FODPSV$OOFODPSVDFFRXQWHGIRUSHU&HQWUHUOLIWUXQ
UHSRUW :2 0 3 ,QVWDOOZHDUEXVKLQJFOHDQULJIORRUORDGMRLQWV´77GULOOSLSHLQSLSHVKHGPRELOL]HFOHDQRXW%+$WRSLSHVKHG
3XPS%3+RI.&/1D&OEULQHLQKLELWHGZLWKELRFLGH
:2 0 3 0DNHXSFOHDQRXW%+$ZLWK5D]RUEDFN6FUDSHUDQGPDJQHWDQGVLQJOHLQKROHSLFNLQJXS´77WR¶8:.
':.3XPS%3+RI.&/1D&OEULQHLQKLELWHGZLWKELRFLGH
:2 0 3 :RUN5D]RUEDFNVFUDSHUIURP¶WR¶3XPSHGD'3YROXPHRI%%/DQGSXOORXWRIKROHVWDQGLQJEDFNGULOOSLSH
IURP¶WRVXUIDFHOD\LQJGRZQFOHDQRXWDVVHPEO\3XPS%3+RI.&/1D&OEULQHLQKLELWHGZLWKELRFLGHSOXVPHWDO
GLVSODFHPHQW
:2 0 3 5XQLQKROHZLWKWHVWSDFNHUWR¶DQGVHWVDPHILOOFDVLQJZLWKEULQH%%/6DQGWHVWWR36,IRUPLQXWHV
FKDUWLQJWHVWJRRGWHVW
:2 0 3 %ORZGRZQNLOOOLQHZKLOHVHWWLQJXSWROD\GRZQGULOOSLSH3XOORXWRIKROHDQGOD\GRZQGULOOSLSHDQG5HWULHYDPDWLFWHVWSDFNHU
IURP¶
:2 . 3 3-60SUHSDUHIRUFRPSOHWLRQ0DNHXSZHDUULQJUXQQLQJWRRO3XOOZHDUULQJ&KDQJHRXWHOHYDWRUV0DNHXSIORRUYDOYHWR
+<'FURVVRYHU.LFNVWDQGVWDJHG2UJDQL]HSLSHVKHGVKRUWVLGHDQGOD\RXW(63%+$
1RWH)OXLGORVVWRZHOO
7RGD\EEOV
7RWDO/RVVHVWR+ROH
%%/633*.&/1D&OEULQHLQKLELWHGZLWKELRFLGH
*DV5HDGLQJV
$YJ%DFNJURXQG*DV 0D[%DFNJURXQG*DV $YJ&RQQHFWLRQ*DV 0D[&RQQHFWLRQ*DV
$YJ'ULOO*DV 0D['ULOO*DV $YJ7ULS*DV 0D[7ULS*DV
'DLO\0XG9ROXPHV
7DQN$GGLWLRQ/RVV 7\SH 'HV 9ROXPHEEO
7DQN
+ROH
/RVV
:HOO1DPH636(25
:HOOERUH1DPH636(
:HOO&RGH
-RE:25.29(5
:&(,/(9(/
'DLO\5HSRUW
'DWH
5HSRUW
3DJHRI
&XPXODWLYH0XG9ROXPHV
$FWLYH9ROXPHEEO
+ROH9ROXPHEEO
$GGLWLRQVEEO
&XP$GGLWLRQVEEO
/RVVHVEEO
&XP/RVVHVEEO
'DLO\&RQWDFWV
3RVLWLRQ &RQWDFW1DPH &RPSDQ\ 7LWOH (PDLO 2IILFH 0RELOH
(QLUHSUHVHQWDWLYH 6WHYH/DZUHQFH $65&(QHUJ\6HUYLFHV 'ULOOLQJ6XSY VLGGULOOLQJ#HQLFRP
(QLUHSUHVHQWDWLYH 0LNH*UXEE $65&(QHUJ\6HUYLFHV 'ULOOLQJ6XSY VLGGULOOLQJ#HQLFRP
(QLUHSUHVHQWDWLYH 0LWFK%LOOLQJWRQ $65&(QHUJ\6HUYLFHV 5LJ&OHUN $.5LJ&OHUNV'R\RQ#HQLFRP
6DIHW\5HSUHVHQWDWLYH 3DW$KHUQ %HDFRQ +6( 3DWULFN$KHUQ#H[WHUQDOHQLFRP
7RRO3XVK 5\DQ3DQNUDW] 'R\RQ'ULOOLQJ 7RRO3XVKHU ULJ#GR\RQGULOOLQJFRP
7RRO3XVK $QGUHZ<RFKXP 'R\RQ'ULOOLQJ 7RXU3XVKHU ULJ#GR\RQGULOOLQJFRP
6DIHW\5HSUHVHQWDWLYH +DUROG5LFKDUGVRQ 'R\RQ'ULOOLQJ +6( KULFKDUGVRQ#GR\RQGULOOLQJFRP
6DIHW\5HSUHVHQWDWLYH 'DYH6HQD 'R\RQ'ULOOLQJ +6( GVHQD#GR\RQGULOOLQJFRP
3HUVRQQHO/RJ32%
&RPSDQ\ 6HUY7\SH :RUN+KU 6WDQGE\+KU &RXQW 1RWH
%DNHU+XJKHV &RPSOHWLRQV)LVKLQJ
+$//,%85721 (OLQH6OLFNOLQH
6&+/80%(5*(5 &HPHQW
:HOO7HF 7UDFWRU
/LWWOH5HG6HUYLFHV 3XPSLQJ6HUYLFH
6&+/80%(5*(5 &RPSOHWLRQV
$65&(QHUJ\6HUYLFHV 5LJFOHUN
$65&(QHUJ\6HUYLFHV 62$
$65&(QHUJ\6HUYLFHV /LIW$GYLVRU
&203(7(17,$ )XHOHU
9DXOW :HOOKHDG
6XSHULRU 7KUHDG5HS
$65&(QHUJ\6HUYLFHV &RPSDQ\PDQ
+$//,%85721 0XG/RJJHUV
6&+/80%(5*(5 6/%0,6ZDFR0XG(QJLQHHU
*%5 3LSHKDQGOLQJVHUYLFH
%DNHU+XJKHV &HQWULOLIW
6&+/80%(5*(5 6/%0,6ZDFR0XGSODQW
6&+/80%(5*(5 6/%:,)
:25/(< 5LJ6XSSRUW
'2<21 2QVKRUH5LJ
%236WDFN &RPSRQHQWV
'HVFULSWLRQ
%236WDFN
6WDUW'DWH
/DVW&HUWLILFDWLRQ'DWH
3UHVVXUH5DWLQJSVL
7\SH 0DNH 0RGHO ,'1RPLQ 35DQJHSVL /DVW&HUW'DWH
$QQXODU +\GULO *.
[9%5V +\GULO 03/
%OLQG6KHDU5DP +\GULO 03/
[9%5V +\GULO 03/
6ORZ&LUFXODWLRQ5DWHV
3XPS1XPEHU0DNH:KLWH6WDU 0RGHO4XDWUR
6WDUW'DWH
(QG'DWH /LQHU6L]HLQ
9ROXPH3HU6WURNH2YHUULGHEEOVWN
0D[3UHVVXUHSVL
'DWH 'HSWKIW.% 6ORZ6SG 6WURNHVVSP 3SVL (II 4)ORZJSP
3XPS1XPEHU0DNH:KLWH6WDU 0RGHO4XDWUR
6WDUW'DWH
(QG'DWH /LQHU6L]HLQ
9ROXPH3HU6WURNH2YHUULGHEEOVWN
0D[3UHVVXUHSVL
'DWH 'HSWKIW.% 6ORZ6SG 6WURNHVVSP 3SVL (II 4)ORZJSP
3XPS1XPEHU0DNH1DWLRQDO6XSSO\0RGHO3
6WDUW'DWH
(QG'DWH /LQHU6L]HLQ
9ROXPH3HU6WURNH2YHUULGHEEOVWN
0D[3UHVVXUHSVL
'DWH 'HSWKIW.% 6ORZ6SG 6WURNHVVSP 3SVL (II 4)ORZJSP
'DLO\%XON
6XSSO\,WHP'HVFULSWLRQ(TXLSPHQW)XHO 8QLW/DEHOJDOXV 8QLW6L]H1RWH
'DWH
&RQVXPHG
5HFHLYHG
5HWXUQHG &XP&RQVXPHG
&XP5HFHLYHG
&XP5HWXUQHG
&XP2Q/RF
1RWH
6XSSO\,WHP'HVFULSWLRQ0XG3ODQW%RLOHUV 8QLW/DEHOJDOXV 8QLW6L]H1RWH
'DWH
&RQVXPHG
5HFHLYHG
5HWXUQHG &XP&RQVXPHG
&XP5HFHLYHG
&XP5HWXUQHG
&XP2Q/RF
1RWH
6XSSO\,WHP'HVFULSWLRQ5LJ)XHO 8QLW/DEHOJDOXV 8QLW6L]H1RWH
'DWH
&RQVXPHG
5HFHLYHG
5HWXUQHG &XP&RQVXPHG
&XP5HFHLYHG
&XP5HWXUQHG
&XP2Q/RF
1RWH
6XSSO\,WHP'HVFULSWLRQ5LJ:DWHU 8QLW/DEHOEEO 8QLW6L]H1RWH
'DWH
&RQVXPHG
5HFHLYHG
5HWXUQHG &XP&RQVXPHG
&XP5HFHLYHG
&XP5HWXUQHG
&XP2Q/RF
1RWH
6XSSO\,WHP'HVFULSWLRQ:,)%RLOHUV 8QLW/DEHOJDOXV 8QLW6L]H1RWH
'DWH
&RQVXPHG
5HFHLYHG
5HWXUQHG &XP&RQVXPHG
&XP5HFHLYHG
&XP5HWXUQHG
&XP2Q/RF
1RWH
/DVW$XWKRULW\9LVLW
'DWH
7RWLQVS1EU 7RWDO,1&QXPEHU &RPPHQW
%237HVW$2*&&%RE1REOHZLWQHVVHG%23WHVW
6723&DUGV6XEPLWWHG
&RPSDQ\ 5SWV &RP
'R\RQ'ULOOLQJ,QF 2EVHUYDWLRQ
'R\RQ'ULOOLQJ,QF3-60
V
'R\RQ'ULOOLQJ,QF +D]DUG,'
*%5 2EVHUYDWLRQ
+DOOLEXUWRQ +D]DUG,'
0,6ZDFR 2EVHUYDWLRQ
0,6ZDFR 0HQWRULQJ
:HOO1DPH636(25
:HOOERUH1DPH636(
:HOO&RGH
-RE:25.29(5
:&(,/(9(/
'DLO\5HSRUW
'DWH
5HSRUW
3DJHRI
6723&DUGV6XEPLWWHG
&RPSDQ\ 5SWV &RP
0,6ZDFR 3URFHGXUH
0,6ZDFR 6WRS:RUN
:RUOH\ 2EVHUYDWLRQ
:RUOH\ &RPPXQLFDWLRQ
:RUOH\ +D]DUG,'
*HQHUDO1RWHV
&RPPHQW%+$
;2YHU
0DJQRVWDU0DJQHW
5D]RUEDFNVFUDSHU
%+$
;RYHU
5HWULHYRPDWLF
:HOO1DPH636(25
:HOOERUH1DPH636(
:HOO&RGH
-RE:25.29(5
:&(,/(9(/
'DLO\5HSRUW
'DWH
5HSRUW
3DJHRI
:HOO+HDGHU
3HUPLW&RQFHVVLRQ1
$'/
2SHUDWRU
(1,3(752/(80
6XEVLGLDU\
(1,3HWUROHXP&R,QF
,QLWLDO/DKHH&RGH
5RWDU\7DEOH(OHYDWLRQIW
*URXQG/HYHOIW
)LUVW)ODQJHIW
5.%%DVH)ODQJHIW
5.%7XELQJ6SRROIW
5LJV
5LJ1DPH
5,*
&RQWUDFWRU
'2<21
5LJ7\SH
/$1'5,*
5LJ1XP
5LJ6WDUW'DWH
5LJ5HOHDVH'DWH
'DLO\,QIRUPDWLRQ
:HDWKHU
&OHDU
7HPSHUDWXUH)
:LQG
:#03+
'D\V/7,GD\V 'D\V5,GD\V 32%
6DIHW\,QFLGHQWV1HDU0LVV
'DWH
&DWHJRU\ 7\SH 6XEW\SH 6HYHULW\ &DXVH /RVWWLPH"
1R
&RPPHQW
=HUR+6(,QFLGHQWV5HYLHZHGWKH&
VZLWKDIRFXVRQ&RQWURORIZRUN5HYLHZHG(QL*ROGHQ5XOHVZLWKDIRFXVRQ'ULYLQJVDIHW\
6DIHW\'ULOOV
7\SH 2FFXU /DVW'DWH 1H[W'DWH
'D\V8QWLO1H[W&KHFN
GD\V
$FFXPXODWRUGULOO
$XWKRULW\9LVLW
%237HVWSUHVVXUH
)LUH'ULOO
.LFN:KLOH7ULSSLQJ'ULOO
5LJ,QVSHFWLRQ
6DIHW\0HHWLQJ
6SLOO'ULOO
6WRS:RUN$XWKRULW\'ULOO
77.LFN:KLOH7ULSSLQJ'ULOO
&DVLQJVVHDW
&DV7\SH 2'LQ ,'LQ *UDGH 7RSIW.% %RWWRPIW.% 79'%RWIW.% /DQGLQJ'DWH
&$6,1* ;
&$6,1* /
&$6,1* /
/,1(5 /
/DVW&HPHQWLQJ
&HPHQWLQJ6WDUW'DWH6WULQJ&$6,1*IW.%&RPPHQW
6WJ 7RSIW.% 7RS0HDV0HWK %WPIW.% &RP
6RQLF 37OLQHVSVL3XPSEEOVSSJ0XG3XVK#ESPSVL%WP3OXJEEOVRISSJ/HDG
FPW#ESPSVLEEOVRISSJ7DLOFPW#ESPSVL7RS3OXJEEOV):EEOVRI
SSJ/61'PXG#ESPSVL%XPSHG3OXJDQGSUHVVXUHXSWRSVLIRUPLQ)ORDWVKHOG&,3#
KUV
-RE,QIRUPDWLRQ
-RE3KDVH
:25.29(5
3ODQQHG6WDUW'DWH
6WDUW'DWH
(QG'DWH 3'XUDWLRQGD\V
'DLO\6XPPDU\2SHUDWLRQV
K)RUHFDVW
0DNHXSILQDOVSOLFHWRSHQHWUDWRUDQGFDSWXEHVWRWXELQJKDQJHU3HUIRUPWHVWVRQFDEOHDQGFDSWXEHV/DQGRXWWXELQJKDQJHUUXQLQORFNGRZQVFUHZVDQGWHVWXSSHUDQGORZHUERG\VHDOVWRSVLIRU
PLQXWHV5LJGRZQ%DNHUDQG*%5&OHDQDQGFOHDUIORRU1LSSOHGRZQ%23(1LSSOHXS7UHHDQGSHUIRUP3DVVSRUWWHVW3UHSDUHULJWRPRYH
K6XPPDU\
5LJXS(63UXQQLQJHTXLSPHQWPDNHXS(63FRPSOHWLRQDQGUXQLQKROHZLWK(63WR¶PDLQWDLQLQJ36,RQFDSLOODU\OLQHDQGSHUIRUPLQJHOHFWULFDOFKHFNVHYHU\¶
2SHUDWLRQDW
1LSSOLQJGRZQ%23
V
7LPH/RJ
6WDUW
7LPH
(QG
7LPH 'XUKU
&XP'XU
KU3KDVH 2SU $FW 3ODQ 2SHU'HVFU
:2 . 3 &RQWLQXHWRULJXSIRUFRPSOHWLRQ0RELOL]HFODPSV%DNHUFHQWHUOLIWMREER[DQGHTXLSPHQW+RRNXSSRZHUSDFNDQGSRZHU
WRQJV6WULQJ(63FDEOHDQGFDSWXEHIURPVSRROLQJXQLWRYHUVKHDYHVDQGEDFNGRZQWRULJIORRU3XPS%3+RI
.&/1D&OEULQHLQKLELWHGZLWKELRFLGH
:2 . 3 3-60PDNHXS(63DVVHPEO\VKURXGPRWRUVHDOVDQGSXPSV6HUYLFHPRWRUDQGVHDOVHQVXUHURWDWLRQRIDOOHTXLSPHQW
,QVWDOOFKHPLFDOLQMHFWLRQOLQHWHFFDEOHPDNHXS0/(DQGVHFXUHDOOZLWKSURWHFWDOL]HUVORZHUDVVHPEO\LQWRVKURXGDQG
VHFXUHZLWKVKURXGKDQJHU3XPS%3+RI.&/1D&OEULQHLQKLELWHGZLWKELRFLGH
:2 . 3 0DNHXSMRLQWUXQLQKROHWR¶¶RQILUVWMRLQWDQG0DNH(63FDEOHWR0/(VSOLFH¶WDOO\GHSWKSHUIRUPHG
HOHFWULFDOFKHFNVDQGSUHVVXUHGFDSLOODU\WR36,PRQLWRULQJSUHVVXUHZLWKGDWDORJJHU3XPS%3+RI.&/1D&O
EULQHLQKLELWHGZLWKELRFLGH
:2 . 3 5XQLQKROHZLWK(63FRPSOHWLRQIURP¶WR¶PDLQWDLQLQJ36,RQFDSLOODU\OLQHDQGSHUIRUPLQJHOHFWULFDOFKHFNV
HYHU\¶3XPS%3+RI.&/1D&OEULQHLQKLELWHGZLWKELRFLGH
:2 . 3 5LJXSDQGSXPSWXELQJ,&3 SVL&DXJKWSUHVVXUHDWEEOVDZD\VKXWGRZQDWEEOVDZD\%30 SVL%ORZ
GRZQWRSGULYH
:2 . 3 5XQLQKROHZLWK(63FRPSOHWLRQIURP¶WR¶PDLQWDLQLQJ36,RQFDSLOODU\OLQHDQGSHUIRUPLQJHOHFWULFDO
FKHFNVHYHU\¶0DNHXSORZHUVZLYHODVVHPEO\LQVWDOO7:&LQWXELQJKDQJHU3LFNXSODQGLQJMRLQWDQGWXELQJKDQJHU
DQGPDNHXSXSSHUVZLYHOMRLQWDVVHPEO\WRORZHUDVVHPEO\DQGFRPSOHWLRQVWULQJ$OLJQKDQJHUIRUODQGLQJDQGWRTXHXS
VZLYHOMRLQW7HUPLQDWH(63FDEOHDQGSUHSDUHIRUVSOLFH3XPS%3+RI.&/1D&OEULQHLQKLELWHGZLWKELRFLGH
$DQQXOXV3UHVVXUHSVL
1RWH)OXLGORVVWRZHOO
7RGD\EEOV
7RWDO/RVVHVWR+ROH
%%/633*.&/1D&OEULQHLQKLELWHGZLWKELRFLGH
*DV5HDGLQJV
$YJ%DFNJURXQG*DV 0D[%DFNJURXQG*DV $YJ&RQQHFWLRQ*DV 0D[&RQQHFWLRQ*DV
$YJ'ULOO*DV 0D['ULOO*DV $YJ7ULS*DV 0D[7ULS*DV
'DLO\0XG9ROXPHV
7DQN$GGLWLRQ/RVV 7\SH 'HV 9ROXPHEEO
7DQN
+ROH
/RVV
:HOO1DPH636(25
:HOOERUH1DPH636(
:HOO&RGH
-RE:25.29(5
:&(,/(9(/
'DLO\5HSRUW
'DWH
5HSRUW
3DJHRI
&XPXODWLYH0XG9ROXPHV
$FWLYH9ROXPHEEO
+ROH9ROXPHEEO
$GGLWLRQVEEO
&XP$GGLWLRQVEEO
/RVVHVEEO
&XP/RVVHVEEO
'DLO\&RQWDFWV
3RVLWLRQ &RQWDFW1DPH &RPSDQ\ 7LWOH (PDLO 2IILFH 0RELOH
(QLUHSUHVHQWDWLYH 6WHYH/DZUHQFH $65&(QHUJ\6HUYLFHV 'ULOOLQJ6XSY VLGGULOOLQJ#HQLFRP
(QLUHSUHVHQWDWLYH 0LNH*UXEE $65&(QHUJ\6HUYLFHV 'ULOOLQJ6XSY VLGGULOOLQJ#HQLFRP
(QLUHSUHVHQWDWLYH 0LWFK%LOOLQJWRQ $65&(QHUJ\6HUYLFHV 5LJ&OHUN $.5LJ&OHUNV'R\RQ#HQLFRP
6DIHW\5HSUHVHQWDWLYH 3DW$KHUQ %HDFRQ +6( 3DWULFN$KHUQ#H[WHUQDOHQLFRP
7RRO3XVK 5\DQ3DQNUDW] 'R\RQ'ULOOLQJ 7RRO3XVKHU ULJ#GR\RQGULOOLQJFRP
7RRO3XVK $QGUHZ<RFKXP 'R\RQ'ULOOLQJ 7RXU3XVKHU ULJ#GR\RQGULOOLQJFRP
6DIHW\5HSUHVHQWDWLYH +DUROG5LFKDUGVRQ 'R\RQ'ULOOLQJ +6( KULFKDUGVRQ#GR\RQGULOOLQJFRP
6DIHW\5HSUHVHQWDWLYH 'DYH6HQD 'R\RQ'ULOOLQJ +6( GVHQD#GR\RQGULOOLQJFRP
3HUVRQQHO/RJ32%
&RPSDQ\ 6HUY7\SH :RUN+KU 6WDQGE\+KU &RXQW 1RWH
%DNHU+XJKHV &RPSOHWLRQV)LVKLQJ
+$//,%85721 (OLQH6OLFNOLQH
6&+/80%(5*(5 &HPHQW
:HOO7HF 7UDFWRU
/LWWOH5HG6HUYLFHV 3XPSLQJ6HUYLFH
6&+/80%(5*(5 &RPSOHWLRQV
$65&(QHUJ\6HUYLFHV 5LJFOHUN
$65&(QHUJ\6HUYLFHV 62$
$65&(QHUJ\6HUYLFHV /LIW$GYLVRU
&203(7(17,$ )XHOHU
9DXOW :HOOKHDG
6XSHULRU 7KUHDG5HS
$65&(QHUJ\6HUYLFHV &RPSDQ\PDQ
+$//,%85721 0XG/RJJHUV
6&+/80%(5*(5 6/%0,6ZDFR0XG(QJLQHHU
*%5 3LSHKDQGOLQJVHUYLFH
%DNHU+XJKHV &HQWULOLIW
6&+/80%(5*(5 6/%0,6ZDFR0XGSODQW
6&+/80%(5*(5 6/%:,)
:25/(< 5LJ6XSSRUW
'2<21 2QVKRUH5LJ
%236WDFN &RPSRQHQWV
'HVFULSWLRQ
%236WDFN
6WDUW'DWH
/DVW&HUWLILFDWLRQ'DWH
3UHVVXUH5DWLQJSVL
7\SH 0DNH 0RGHO ,'1RPLQ 35DQJHSVL /DVW&HUW'DWH
$QQXODU +\GULO *.
[9%5V +\GULO 03/
%OLQG6KHDU5DP +\GULO 03/
[9%5V +\GULO 03/
6ORZ&LUFXODWLRQ5DWHV
3XPS1XPEHU0DNH:KLWH6WDU 0RGHO4XDWUR
6WDUW'DWH
(QG'DWH /LQHU6L]HLQ
9ROXPH3HU6WURNH2YHUULGHEEOVWN
0D[3UHVVXUHSVL
'DWH 'HSWKIW.% 6ORZ6SG 6WURNHVVSP 3SVL (II 4)ORZJSP
3XPS1XPEHU0DNH:KLWH6WDU 0RGHO4XDWUR
6WDUW'DWH
(QG'DWH /LQHU6L]HLQ
9ROXPH3HU6WURNH2YHUULGHEEOVWN
0D[3UHVVXUHSVL
'DWH 'HSWKIW.% 6ORZ6SG 6WURNHVVSP 3SVL (II 4)ORZJSP
3XPS1XPEHU0DNH1DWLRQDO6XSSO\0RGHO3
6WDUW'DWH
(QG'DWH /LQHU6L]HLQ
9ROXPH3HU6WURNH2YHUULGHEEOVWN
0D[3UHVVXUHSVL
'DWH 'HSWKIW.% 6ORZ6SG 6WURNHVVSP 3SVL (II 4)ORZJSP
'DLO\%XON
6XSSO\,WHP'HVFULSWLRQ(TXLSPHQW)XHO 8QLW/DEHOJDOXV 8QLW6L]H1RWH
'DWH
&RQVXPHG
5HFHLYHG
5HWXUQHG &XP&RQVXPHG
&XP5HFHLYHG
&XP5HWXUQHG
&XP2Q/RF
1RWH
6XSSO\,WHP'HVFULSWLRQ0XG3ODQW%RLOHUV 8QLW/DEHOJDOXV 8QLW6L]H1RWH
'DWH
&RQVXPHG
5HFHLYHG
5HWXUQHG &XP&RQVXPHG
&XP5HFHLYHG
&XP5HWXUQHG
&XP2Q/RF
1RWH
6XSSO\,WHP'HVFULSWLRQ5LJ)XHO 8QLW/DEHOJDOXV 8QLW6L]H1RWH
'DWH
&RQVXPHG
5HFHLYHG
5HWXUQHG &XP&RQVXPHG
&XP5HFHLYHG
&XP5HWXUQHG
&XP2Q/RF
1RWH
6XSSO\,WHP'HVFULSWLRQ5LJ:DWHU 8QLW/DEHOEEO 8QLW6L]H1RWH
'DWH
&RQVXPHG
5HFHLYHG
5HWXUQHG &XP&RQVXPHG
&XP5HFHLYHG
&XP5HWXUQHG
&XP2Q/RF
1RWH
6XSSO\,WHP'HVFULSWLRQ:,)%RLOHUV 8QLW/DEHOJDOXV 8QLW6L]H1RWH
'DWH
&RQVXPHG
5HFHLYHG
5HWXUQHG &XP&RQVXPHG
&XP5HFHLYHG
&XP5HWXUQHG
&XP2Q/RF
1RWH
/DVW$XWKRULW\9LVLW
'DWH
7RWLQVS1EU 7RWDO,1&QXPEHU &RPPHQW
%237HVW$2*&&%RE1REOHZLWQHVVHG%23WHVW
6723&DUGV6XEPLWWHG
&RPSDQ\ 5SWV &RP
$65& 2EVHUYDWLRQV
'R\RQ'ULOOLQJ,QF 2EVHUYDWLRQ
'R\RQ'ULOOLQJ,QF +D]DUG,'
'R\RQ'ULOOLQJ,QF 3-60
V
'R\RQ'ULOOLQJ,QF 0HQWRULQJ
*%5 2EVHUYDWLRQ
+DOOLEXUWRQ +D]DUG,'
:HOO1DPH636(25
:HOOERUH1DPH636(
:HOO&RGH
-RE:25.29(5
:&(,/(9(/
'DLO\5HSRUW
'DWH
5HSRUW
3DJHRI
6723&DUGV6XEPLWWHG
&RPSDQ\ 5SWV &RP
0,6ZDFR +D]DUG,'
0,6ZDFR 2EVHUYDWLRQ
0,6ZDFR (QYLURPHQWDO
0,6ZDFR 0HQWRULQJ
:RUOH\ 2EVHUYDWLRQ
:RUOH\ +D]DUG,'
*HQHUDO1RWHV
&RPPHQW
:HOO1DPH636(25
:HOOERUH1DPH636(
:HOO&RGH
-RE:25.29(5
:&(,/(9(/
'DLO\5HSRUW
'DWH
5HSRUW
3DJHRI
:HOO+HDGHU
3HUPLW&RQFHVVLRQ1
$'/
2SHUDWRU
(1,3(752/(80
6XEVLGLDU\
(1,3HWUROHXP&R,QF
,QLWLDO/DKHH&RGH
5RWDU\7DEOH(OHYDWLRQIW
*URXQG/HYHOIW
)LUVW)ODQJHIW
5.%%DVH)ODQJHIW
5.%7XELQJ6SRROIW
5LJV
5LJ1DPH
5,*
&RQWUDFWRU
'2<21
5LJ7\SH
/$1'5,*
5LJ1XP
5LJ6WDUW'DWH
5LJ5HOHDVH'DWH
'DLO\,QIRUPDWLRQ
:HDWKHU
&OHDU
7HPSHUDWXUH)
:LQG
1:#03+
'D\V/7,GD\V 'D\V5,GD\V 32%
6DIHW\,QFLGHQWV1HDU0LVV
'DWH
&DWHJRU\ 7\SH 6XEW\SH 6HYHULW\ &DXVH /RVWWLPH"
1R
&RPPHQW
=HUR+6(,QFLGHQWV5HYLHZHGWKH&
VZLWKDIRFXVRQ&RPSODFHQF\5HYLHZHG(QL*ROGHQ5XOHVZLWKDIRFXVRQ(QHUJL]HG6\VWHPV
&RQGXFWHG6:$8:$ZLWKORJLVWLFFUHZ
6DIHW\'ULOOV
7\SH 2FFXU /DVW'DWH 1H[W'DWH
'D\V8QWLO1H[W&KHFN
GD\V
$FFXPXODWRUGULOO
$XWKRULW\9LVLW
%237HVWSUHVVXUH
)LUH'ULOO
.LFN:KLOH7ULSSLQJ'ULOO
5LJ,QVSHFWLRQ
6DIHW\0HHWLQJ
6SLOO'ULOO
6WRS:RUN$XWKRULW\'ULOO
77.LFN:KLOH7ULSSLQJ'ULOO
&DVLQJVVHDW
&DV7\SH 2'LQ ,'LQ *UDGH 7RSIW.% %RWWRPIW.% 79'%RWIW.% /DQGLQJ'DWH
&$6,1* ;
&$6,1* /
&$6,1* /
/,1(5 /
/DVW&HPHQWLQJ
&HPHQWLQJ6WDUW'DWH6WULQJ&$6,1*IW.%&RPPHQW
6WJ 7RSIW.% 7RS0HDV0HWK %WPIW.% &RP
6RQLF 37OLQHVSVL3XPSEEOVSSJ0XG3XVK#ESPSVL%WP3OXJEEOVRISSJ/HDG
FPW#ESPSVLEEOVRISSJ7DLOFPW#ESPSVL7RS3OXJEEOV):EEOVRI
SSJ/61'PXG#ESPSVL%XPSHG3OXJDQGSUHVVXUHXSWRSVLIRUPLQ)ORDWVKHOG&,3#
KUV
-RE,QIRUPDWLRQ
-RE3KDVH
:25.29(5
3ODQQHG6WDUW'DWH
6WDUW'DWH
(QG'DWH
3'XUDWLRQGD\V
'DLO\6XPPDU\2SHUDWLRQV
K)RUHFDVW
0RYHSLWFRPSOH[DQGVSRWQH[WWRVXE6NLGIORRUWRGULOOSRVLWLRQ6HWSXPS.RRP\KRXVH0XGPDQVKDFNDQG&UDQHLQ+DOOLEXUWRQ/RJJLQJXQLW%HUPXSULJ3OXJLQLQWHUFRQQHFWV5LJXSDQGWHVWOLQHV%ULQJ
RQSSJ%ULQHDQGNLOOZHOO
K6XPPDU\
&RPSOHWH(63FDEOHVSOLFHDQGFDSWXEHWHUPLQDWLRQ/DQGRXWWXELQJKDQJHU1LSSOHGRZQ%23VWDFN1LSSOHXSWUHHDQG3HUIRUPSDVVSRUWWHVWWHVWZHUHJRRG5LJGRZQDQGPRYHSLWVDQGVXEEDVH6SRWDQG
VKLPVXEEDVHDQGVWDJHSLWFRPSOH[
7KLVZLOOEHODVW5:2UHSRUW
2SHUDWLRQDW
+RRNLQJXSLQWHUFRQQHFWVDQGEHUPLQJULJ
7LPH/RJ
6WDUW
7LPH
(QG
7LPH 'XUKU
&XP'XU
KU3KDVH 2SU $FW 3ODQ 2SHU'HVFU
:2 . 3 &RPSOHWHFDEOHVSOLFHWRSHQHWUDWRU7HUPLQDWH3HQHWUDWRU(1,HOHFWULFLDQZLWQHVVHGDQGFDSWXEWRKDQJHU7HVWFDSOLQH
SHQHWUDWLRQ YRLGRQKDQJHUWRSVLIRUPLQXWHVJRRGWHVW7HVW(63FDEOHWKURXJKFRQQHFWRUJRRGSKDVHWRSKDVH
DQGJRRGWRJURXQG5HWHVWDIWHUFRQQHFWHGWRSHQHWUDWRU3XPSGRZQFDSWXEHEUHDNRYHUSUHVVXUH SVLSXPS
WKURXJKSUHVVXUH SVL6WDELOL]DWLRQSUHVVXUH SVL%ORZGRZQSXPSVNLOOOLQHVDQGFKRNHPDQLIROG(PSW\SLWVDQG
VWDUWFOHDQLQJSLWV
:2 . 3 /DQGRXWWXELQJKDQJHUZLWKERWWRPRIVKURXGDW¶38 .62 .5HWHVW(63FDEOHDIWHUODQGLQJRXWKDQJHUZLWK
XPELOLFDOWHVWJRRG5XQLQORFNGRZQVFUHZV7HVWKDQJHUERG\VHDOVWRSVLIRUPLQXWHVZLWQHVVHGE\FRPDQ5XQ
(63FDEOHDQGFDSWXEHEDFNRYHUVKHDYHVDQGVSRROEDFNRQVSRROVLQVSRROLQJXQLW&OHDQDQGFOHDUIORRU
:2 & 3 1LSSOHGRZQ%23VWDFNFRQWLQXHWRFOHDQSLWVDQGUHPRYHVSRROVIURPVSRROKRXVH5HPRYHK\GUDXOLFKRVHVIURPEHWZHHQ
ULJDQGDFFXPXODWRUEXLOGLQJDQGSUHSSXPSFRPSOH[IRUUHPRYDO
:2 & 3 5HPRYHKLJKSUHVVXUHULVHUIURPZHOOKHDGLQVSHFWWXELQJKDQJHUWHUPLQDWHFDSLOODU\OLQHWKURXJKZHOOKHDGILOOYRLGZLWKRLO
LQVWDOOWUHHDQGWHVWYRLGWR36,IRUPLQXWHV&RQWLQXHWRFOHDQSLWVSRZHUGRZQXQSOXJDQGVHFXUHWRSGULYHDQGUDLO
IRUULJPRYH
:2 & 3 5LJXSDQGFRQGXFWSDVVSRUWWHVWLQJWHVWVZHUHJRRG6LPRSVUHPRYH7:&UHPRYH´IODQJHIURP$DQQXOXVDQG
LQVWDOOVSRROIURPDQQXOXVWRGLHVHOOLQH5LJGRZQLQWHUFRQQHFWOLQHVXQGHUULJIORRUSXPSURRPDQGPXGSLWURRI%ORZGRZQ
VWHDPWRULJIORRUPRYH+DOOLEXUWRQPXGORJJHUVVKDFNZLWK:RUOH\FUDQH&RQGXFWHG6:$8:$GULOOZLWK/RJLVWLFVFUHZ
:2 $ 3 'LVFRQQHFWVXLWHFDVHOLQHVIURPULJWRYDOYHKRXVHPRYHPXGSXPS%ORZGRZQZDWHU5ROOXSFDEOHVDERYHVNLGOHYHO
)ROGXSEHDYHUVOLGH3UHSIORRUIRUVNLG6NLGIORRUWRPRYHSRVLWLRQ5ROORXWKHUFXOLWHDQGOD\PDWERDUGVIRU63'LV
FRQQHFWIURPKLJKOLQHSRZHU(PSW\ZDWHUWDQN
:2 $ 3 -DFNXSSLWFRPSOH[DQGPRYHDZD\IURPVXEEDVH-DFNXSVXEEDVHDQGEDFNRIIZHOOED\6WDJHSLWVDQGVXEGRZQZHOO
ED\3LFNXSPDWVDQGVSRWDW630RYH6XEEDVHDQGFHQWHURYHU636KLPXSVXEEDVH
1RWH)OXLGORVVWRZHOO
7RGD\EEOV
7RWDO/RVVHVWR+ROH
%%/633*.&/1D&OEULQHLQKLELWHGZLWKELRFLGH
127(5LJUHOHDVHGIURP636(#
*DV5HDGLQJV
$YJ%DFNJURXQG*DV 0D[%DFNJURXQG*DV $YJ&RQQHFWLRQ*DV 0D[&RQQHFWLRQ*DV
$YJ'ULOO*DV 0D['ULOO*DV $YJ7ULS*DV 0D[7ULS*DV
:HOO1DPH636(25
:HOOERUH1DPH636(
:HOO&RGH
-RE:25.29(5
:&(,/(9(/
'DLO\5HSRUW
'DWH
5HSRUW
3DJHRI
'DLO\0XG9ROXPHV
7DQN$GGLWLRQ/RVV 7\SH 'HV 9ROXPHEEO
7DQN
+ROH
/RVV
&XPXODWLYH0XG9ROXPHV
$FWLYH9ROXPHEEO
+ROH9ROXPHEEO
$GGLWLRQVEEO
&XP$GGLWLRQVEEO
/RVVHVEEO
&XP/RVVHVEEO
'DLO\&RQWDFWV
3RVLWLRQ &RQWDFW1DPH &RPSDQ\ 7LWOH (PDLO 2IILFH 0RELOH
(QLUHSUHVHQWDWLYH 6WHYH/DZUHQFH $65&(QHUJ\6HUYLFHV 'ULOOLQJ6XSY VLGGULOOLQJ#HQLFRP
(QLUHSUHVHQWDWLYH 0LNH*UXEE $65&(QHUJ\6HUYLFHV 'ULOOLQJ6XSY VLGGULOOLQJ#HQLFRP
(QLUHSUHVHQWDWLYH 0LWFK%LOOLQJWRQ $65&(QHUJ\6HUYLFHV 5LJ&OHUN $.5LJ&OHUNV'R\RQ#HQLFRP
6DIHW\5HSUHVHQWDWLYH 3DW$KHUQ %HDFRQ +6( 3DWULFN$KHUQ#H[WHUQDOHQLFRP
7RRO3XVK 5\DQ3DQNUDW] 'R\RQ'ULOOLQJ 7RRO3XVKHU ULJ#GR\RQGULOOLQJFRP
7RRO3XVK $QGUHZ<RFKXP 'R\RQ'ULOOLQJ 7RXU3XVKHU ULJ#GR\RQGULOOLQJFRP
6DIHW\5HSUHVHQWDWLYH +DUROG5LFKDUGVRQ 'R\RQ'ULOOLQJ +6( KULFKDUGVRQ#GR\RQGULOOLQJFRP
6DIHW\5HSUHVHQWDWLYH 'DYH6HQD 'R\RQ'ULOOLQJ +6( GVHQD#GR\RQGULOOLQJFRP
3HUVRQQHO/RJ32%
&RPSDQ\ 6HUY7\SH :RUN+KU 6WDQGE\+KU &RXQW 1RWH
%DNHU+XJKHV &RPSOHWLRQV)LVKLQJ
+$//,%85721 (OLQH6OLFNOLQH
6&+/80%(5*(5 &HPHQW
:HOO7HF 7UDFWRU
/LWWOH5HG6HUYLFHV 3XPSLQJ6HUYLFH
6&+/80%(5*(5 &RPSOHWLRQV
$65&(QHUJ\6HUYLFHV 5LJFOHUN
$65&(QHUJ\6HUYLFHV 62$
$65&(QHUJ\6HUYLFHV /LIW$GYLVRU
&203(7(17,$ )XHOHU
9DXOW :HOOKHDG
6XSHULRU 7KUHDG5HS
$65&(QHUJ\6HUYLFHV &RPSDQ\PDQ
+$//,%85721 0XG/RJJHUV
6&+/80%(5*(5 6/%0,6ZDFR0XG(QJLQHHU
*%5 3LSHKDQGOLQJVHUYLFH
%DNHU+XJKHV &HQWULOLIW
6&+/80%(5*(5 6/%0,6ZDFR0XGSODQW
6&+/80%(5*(5 6/%:,)
:25/(< 5LJ6XSSRUW
'2<21 2QVKRUH5LJ
%236WDFN &RPSRQHQWV
'HVFULSWLRQ
%236WDFN
6WDUW'DWH
/DVW&HUWLILFDWLRQ'DWH
3UHVVXUH5DWLQJSVL
7\SH 0DNH 0RGHO ,'1RPLQ 35DQJHSVL /DVW&HUW'DWH
$QQXODU +\GULO *.
[9%5V +\GULO 03/
%OLQG6KHDU5DP +\GULO 03/
[9%5V +\GULO 03/
6ORZ&LUFXODWLRQ5DWHV
3XPS1XPEHU0DNH:KLWH6WDU 0RGHO4XDWUR
6WDUW'DWH
(QG'DWH /LQHU6L]HLQ
9ROXPH3HU6WURNH2YHUULGHEEOVWN
0D[3UHVVXUHSVL
'DWH 'HSWKIW.% 6ORZ6SG 6WURNHVVSP 3SVL (II 4)ORZJSP
3XPS1XPEHU0DNH:KLWH6WDU 0RGHO4XDWUR
6WDUW'DWH
(QG'DWH /LQHU6L]HLQ
9ROXPH3HU6WURNH2YHUULGHEEOVWN
0D[3UHVVXUHSVL
'DWH 'HSWKIW.% 6ORZ6SG 6WURNHVVSP 3SVL (II 4)ORZJSP
3XPS1XPEHU0DNH1DWLRQDO6XSSO\0RGHO3
6WDUW'DWH
(QG'DWH /LQHU6L]HLQ
9ROXPH3HU6WURNH2YHUULGHEEOVWN
0D[3UHVVXUHSVL
'DWH 'HSWKIW.% 6ORZ6SG 6WURNHVVSP 3SVL (II 4)ORZJSP
'DLO\%XON
6XSSO\,WHP'HVFULSWLRQ(TXLSPHQW)XHO 8QLW/DEHOJDOXV 8QLW6L]H1RWH
'DWH
&RQVXPHG
5HFHLYHG
5HWXUQHG &XP&RQVXPHG
&XP5HFHLYHG
&XP5HWXUQHG
&XP2Q/RF
1RWH
6XSSO\,WHP'HVFULSWLRQ0XG3ODQW%RLOHUV 8QLW/DEHOJDOXV 8QLW6L]H1RWH
'DWH
&RQVXPHG
5HFHLYHG
5HWXUQHG &XP&RQVXPHG
&XP5HFHLYHG
&XP5HWXUQHG
&XP2Q/RF
1RWH
6XSSO\,WHP'HVFULSWLRQ5LJ)XHO 8QLW/DEHOJDOXV 8QLW6L]H1RWH
'DWH
&RQVXPHG
5HFHLYHG
5HWXUQHG &XP&RQVXPHG
&XP5HFHLYHG
&XP5HWXUQHG
&XP2Q/RF
1RWH
6XSSO\,WHP'HVFULSWLRQ5LJ:DWHU 8QLW/DEHOEEO 8QLW6L]H1RWH
'DWH
&RQVXPHG
5HFHLYHG
5HWXUQHG &XP&RQVXPHG
&XP5HFHLYHG
&XP5HWXUQHG
&XP2Q/RF
1RWH
6XSSO\,WHP'HVFULSWLRQ:,)%RLOHUV 8QLW/DEHOJDOXV 8QLW6L]H1RWH
'DWH
&RQVXPHG
5HFHLYHG
5HWXUQHG &XP&RQVXPHG
&XP5HFHLYHG
&XP5HWXUQHG
&XP2Q/RF
1RWH
/DVW$XWKRULW\9LVLW
'DWH
7RWLQVS1EU 7RWDO,1&QXPEHU &RPPHQW
%237HVW$2*&&%RE1REOHZLWQHVVHG%23WHVW
6723&DUGV6XEPLWWHG
&RPSDQ\ 5SWV &RP
'R\RQ'ULOOLQJ,QF +D]DUG,'
:HOO1DPH636(25
:HOOERUH1DPH636(
:HOO&RGH
-RE:25.29(5
:&(,/(9(/
'DLO\5HSRUW
'DWH
5HSRUW
3DJHRI
6723&DUGV6XEPLWWHG
&RPSDQ\ 5SWV &RP
'R\RQ'ULOOLQJ,QF3-60
V
'R\RQ'ULOOLQJ,QF 2EVHUYDWLRQ
0,6ZDFR *RRG&DWFK
0,6ZDFR &RPPXQLFDWLRQ
0,6ZDFR 2EVHUYDWLRQ
:RUOH\ 2EVHUYDWLRQ
:RUOH\ 6WRS:RUN
:RUOH\ +D]DUG,'
*HQHUDO1RWHV
&RPPHQW
1. Type of Request:Abandon Plug Perforations Fracture Stimulate Repair Well Operations shutdown
Suspend Perforate Other Stimulate Pull Tubing Change Approved Program
Plug for Redrill Perforate New Pool Re-enter Susp Well Alter Casing Other: ESP change OUT
2.Operator Name:4. Current Well Class:5. Permit to Drill Number:
Exploratory Development
3. Address:Stratigraphic Service 6.API Number:
7. If perforating:8. Well Name and Number:
What Regulation or Conservation Order governs well spacing in this pool?
Will planned perforations require a spacing exception?Yes No
9. Property Designation (Lease Number):10. Field/Pool(s):
11.
Total Depth MD (ft):Total Depth TVD (ft): Effective Depth MD: Effective Depth TVD: MPSP (psi):Plugs (MD):Junk (MD):
15,240 4,015 15,236 4,015 808 N/A
Casing Collapse
Structural
Conductor
Surface 2,480
Intermediate 4,790
Production
Liner slotted
Packers and SSSV Type:Packers and SSSV MD (ft) and TVD (ft):
12. Attachments:Proposal Summary Wellbore schematic 13. Well Class after proposed work:
Detailed Operations Program BOP Sketch Exploratory Stratigraphic Development Service
14. Estimated Date for 15. Well Status after proposed work:
Commencing Operations:OIL WINJ WDSPL Suspended
16. Verbal Approval:Date:GAS WAG GSTOR SPLUG
Commission Representative: GINJ Op Shutdown Abandoned
Contact Name:
Contact Email:
Contact Phone:
Date:
Conditions of approval: Notify Commission so that a representative may witness Sundry Number:
Plug Integrity BOP Test Mechanical Integrity Test Location Clearance
Other:
Post Initial Injection MIT Req'd? Yes No
Spacing Exception Required? Yes No Subsequent Form Required:
APPROVED BY
Approved by: COMMISSIONER THE COMMISSION Date:
Comm. Comm. Sr Pet Eng Sr Pet Geo Sr Res Eng
Well Operation Project Manager
Amjad Chaudhry
amjad.chaudhry@eni.com
907-865-3379
Schrader Bluff Oil
6/2/2021
Nikaitchuq
COMMISSION USE ONLY
Authorized Name:
slotted
Tubing Grade:Tubing MD (ft):
3,916-4,015
N/A
Perforation Depth TVD (ft):Tubing Size:
PRESENT WELL CONDITION SUMMARY
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
APPLICATION FOR SUNDRY APPROVALS
20 AAC 25.280
ADL 0391283, 0388583,0390616, 0390615
214-011
3700 Centerpoint dr Suite 500, Anchorage, AK, 99503 50-62923510-00-00
Eni US Operating Co. Inc.
Length Size
N/A
SP24-SE1
N/A
L80
TVD Burst
4,674
MD
6,890
5,210
160
2449
3,917
160
2,900
20
13.375
160
9.6255,237
2,900
Perforation Depth MD (ft):
5,237
5237-15236
5.5
Authorized Title:
17. I hereby certify that the foregoing is true and the procedure approved herein will not
be deviated from without prior written approval.
Authorized Signature:
6/15/2021
15,23610,102
4.5"
4,015
N/A
Stefano Pierfelici
m
n
P
s
6
5
6
t
Form 10-403 Revised 3/2020 Approved application is valid for 12 months from the date of approval.
By Samantha Carlisle at 8:32 am, Jun 07, 2021
321-283
Digitally signed by: Stefano Pierfelici
DN: CN = Stefano Pierfelici C = AD
Date: 2021.06.07 08:07:26 -08'00'
Stefano
Pierfelic
i
DSR-6/7/21
10-404
X
DLB 06/09/2021
X
X
BOP test to 3500 psig
Annular preventer test to 2500 psig
VTL 6/11/21
dts 6/11/2021
6/11/21
Jessie L.
Chmielowski
Digitally signed by Jessie L.
Chmielowski
Date: 2021.06.11 13:23:48 -08'00'
RBDMS HEW 6/11/2021
3700 Centerpoint Drive Suite 500
Anchorage, Alaska 99503
Stefano Pierfelici
Phone (907) 865-3320
Email: Stefano.pierfelici@eni.com
June 2, 2021
Alaska Oil and Gas Conservation Commission
333 West 7th Avenue, Suite 100
Anchorage, Alaska 99501
RE: Application for Sundry Approval for SP24-SE1 Rig Workover
Dear Commissioners,
ENI US Operating Co. Inc. hereby applies for a Workover Sundry for well SP24-SE1.
SP24-SE1 was recompleted on Spy Island on April 3rd, 2014 with a TTC electric submersible
pump set at a depth of 4,779’ MD. This ESP producer was completed without a packer.
The well was started up for production in April 2014. Workover was performed because of a
tubing leak in 2019 and after workover well was put back on production.
Well is down since March 11, 2021 because of a suspected tubing leak.
The estimated date for beginning this work is June 15, 2021.
Please find attached for the review of the Commission forms 10-403 and supporting
documentation.
If you have any questions or require further information, please contact Amjad Chaudhry at 907-
865-3379.
Sincerely,
Stefano Pierfelici
Well Operations Project Manager
Digitally signed by: Stefano Pierfelici
DN: CN = Stefano Pierfelici C = AD
Date: 2021.06.07 08:11:53 -08'00'
Stefano
Pierfelic
i
Well is down since March 11, 2021 because of a suspected tubing leak.
Workover was performed because of app p
tubing leak in 2019 and after workover well was put back on production.r
SP24-SE1 Workover – Summary Page
PTD#:214-011
Current Status
Well SP24-SE1 is currently shut down because of a suspected tubing leak
Scope of Work
Scope of this workover is pull out existing tubing and run new tubing coated tubing and
new ESP.
General Well info
Reservoir Pressure/TVD: This well is expected to have a static max bottom
hole pressure of approximately 1200 psi (3,916’
TVD) during the time of workover.
Wellhead type/pressure rating: Vetco Gray, MB-247/5000 psi
BOP configuration: Annular/VBR/shear rams/VBR
TIFL/MIT-IA/MIT-OA: Due to the completion design these tests were not
performed. Intermediate csg 9 5/8” was tested prior
to drill out on March 11, 2014.
Well type: Producer
Estimated start date: June 15, 2021
Drilling rig: Doyon Rig 15
Senior Drilling Engineer Amjad Chaudhry
Amjad.chaudhry@eni.com
Work: 907-865-3379
Well Operations project Manager Stefano Pierfelici
Stefano.pierfelici@eni.com
Work: 907-865-3320
Procedure:
1. Pump in bull heading 8.6-ppg KCL/NaCl brine through tree. Pump in bull
heading 8.6 ppg KCL/NaCl in IA. Ensure well is killed. Set BPV.
2. MIRU Doyon Rig 15.
3. ND tree and NU BOP and test.
4. POOH completion and lay down ESP assembly.
5. MU new ESP assembly on new tubing and RIH to setting depth.
6. Land hanger, and test it.
7. Install BPV and nipple down BOP.
8. NU tubing adapter and tree.
9. Pull BPV, install test plug and test tree.
10. RDMO.
Below the current schematic of the well:
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
REPORT OF SUNDRY WELL OPERATIONS
DEC - 6 2019
1. Operations Abandon LJ Plug Perforations LJ Fracture Stimulate U Pull Tubing ✓ ACG io s utdown LJ
Performed: Suspend ❑ Perforate ❑ Other Stimulate ❑ Alter Casin g ❑ Change Approved Program ❑
Plug for Redrill ❑ Perforate New Pool ❑ Repair Well ❑ Re-enter Susp Well ❑ Other: ESP Change Out ❑✓
2. Operator En! US Operating Co. Inc.
4. Well Class Before Work:5.
Permit to Drill Number:
Name:
Development ❑✓ Exploratory ❑
Stratigraphic ❑ Service ❑
214-011
3. Address: 3800 Centerpoint Dr Ste 300, Anchorage, AK
6. API Number:
99503
50-62923510-00-00
7. Property Designation (Lease Number):
8. Well Name and Number:
ADL 0391283, 0388583,0390616, 0390615
SP24-SE1
9. Logs (List logs and submit electronic and printed data per 20AAC25.071):
10. Field/Pool(s):
N/A
Nikaitchu / Schrader Bluff Oil Pool
11. Present Well Condition Summary:
Total Depth measured 15,240 feet Plugs measured N/A feet
true vertical 4,015 feet Junk measured N/A feet
Effective Depth measured 15,236 feet Packer measured N/A feet
true vertical 4,015 feet true vertical N/A feet
Casing Length Size MD TVD Burst Collapse
Structural
Conductor 160 20" 160 160
Surface 2900 13-3/8" 2900 2449 5210 2480
Intermediate 5237 9-5/8" 5237 3917 6890 4790
Production
Liner 10,102 5-1/2" 15236 4015 slotted slotted
Perforation depth Measured depth 5,237-15,236 feet
True Vertical depth 3,916-4,015 feet
Tubing (size, grade, measured and true vertical depth) 4-1/2" 11.6 ppf L80 4,803' MD 3,792' TVD
Packers and SSSV (type, measured and true vertical depth) N/A N/A N/A N/A
12. Stimulation or cement squeeze summary: N/A
Intervals treated (measured):
Treatment descriptions including volumes used and final pressure: N/A
13. Representative Daily Average Production or Injection Data
Oil -Bbl Gas-Mcf Water -Bbl I Casing Pressure Tubing Pressure
Prior to well operation: 1385 411013 274 278
Subsequent to operation: 402 26 647 1369 1316
14. Attachments (required per 20 AAC 25.070, 25.071, a 25.283)
15. Well Class after work:
Daily Report of Well Operations El
Exploratory ❑ Development Q Service ❑ Stratigraphic ❑
Copies of Logs and Surveys Run ❑
16. Well Status after work: Oil ✓ Gas El WDSPL
Printed and Electronic Fracture Stimulation Data ❑
GSTOR ❑ WINJ ❑ WAG ❑ GINJ ❑ SUSP ❑ SPLUG ❑
17. 1 hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt:
319-340
Authorized Name: Stefano Piedelici Contact Name: Amjad Chaudhry
Authorized Title: Well Operations Project mans er Contact Email: amiad'chaudhwv peni..rn
f\ 907-865-3379
_
Authorized Signature: �./ \ Date: — Contact Phone:
Form 10-404 Revised 4/2017
,''1��� RB®Mss
1+%&W a�q DEC 0 6 2019
Submit Original Only
O
y CL
U
U
LJ p
Q
i
F-
V-ANO❑
C
m-0
y a�
ANO U
.a
`.
C
0 O
j
Well NameOR
:
Wellbore Name: e: SP24 SP24-SESE1
Well Code: 27974
e�n Job: WORKOVER
11 1111 WCEI Level: 3
Daily Report
Date: 713112019
Report #: 1
Page: 1 of 2
Well Header
Perm111Cound"don N° Operator ubsltliary Inlbal Lahea Cotle
AOL-US583 ENIPETROLEUM ENI Petroleum Co. Irp,
Rome, Table Elevation(N) Ground Lead I-) i -mal ,.age (ft) RKB-Ease Flange (ft) RKB-Tubing global(ft}
5393 0.00 17.18 30.]5 31.54
Rigs
Reg Name Contactor Rig Type Rlg Num Rig Slrt Dale Rig Release Dafe
RIG 15 DOYON UNC RIG 0733 T12D4019
Daily information
Weather Temperature l°F) Wintl Days LTl (days) Days 0.1 (tlays) POB
Cloudy 60.0 5EQ 15 MPH jug 00 64900 1000
Safety Incidents - Near Miss
Dara Category Type Subtype Severity Cause Lost time?
Comment
Safety Drills
Days Limit Next Cheek
Type
POccur last Date
Next Date
(days)
KIDmspewmn
1 n31rz019
&112019
1
Safety Meefrg
1 ]1312019
811819
1
TT Camp Evacuatim One
1 ]1312018
10292019
9D
Casings seat
Cas. Type
OD lin)
ID pn)
Grade
Top(ftKB)
a0thrn(ftKB) TVD Bot IftKB)
Lending Dale
CASING
16.25
XE5
0.0
160.0 1800
2212014
CASING
13318
1242
L80
00
2.9000 2,449.5
3212044
CASING
9518
6.64
L-80
-01
5,239.0 3.9198
3(81'2014
LINER
5114
483
L80
5.1341
15.236.0 4.023.0
3082014
Last Cementing
Cemadingstart
Date: 3,9510 Benner CASING, 5.2370Fcomment:
Slit p
Top (KKB)Top
Meas fil one (fete)
I Com
1
3.76 0
Sonic9,]3> D
PT lines 100013500 psiiPump 110 Phis 10.5 ppg Mud Push Q 5 bpm, 220 psi, Stm Plug, 85 bble of 12.5 ppg Lead
cmt 4.3 bpm, 170 ps, 50 bbl. of 15.8 ppg Teil cml Q 4 3 bpm, 150 psi, Tap Plug, 10 bbl, FW. 378.7 bbls of 9.2
ppg LEND mutl 8his - 2 bpm, 520 psi, Bumped Plug and pressure up to 1020 psi for 5 min. Floats held CIP Q 0417
2
4]3]0
5.263.0
Job Information
hb Phase Planned Starthrf Date SDate Erd Dsto Pfi0 Duration (days)
WORKOVER 713120190000 7131201900:00 0.00
Daily Summary Operations
24n Forecast
Flush ng up. Bullhead 1,000 bma of 9.0 ppg time tlown annulus A to kill waft. Nipple down free and nipple up ROPE and test
24h Summary
More rock washer, pis and sub bass. Prepare and. lay liner antl maln9 boards Spat sub base antl pi rock washer, pump #3, deftinge box, generator #5 and mutl lab. Common beaming around dg. Confirm. to
rig up mlemprnects.
Operatlon at 07.00
Transient, Auld 10 pits and pappmg for well (till
Time Log
Start
End
Cum our
Time
Three
DUrru
put
Phase
Opr.
Act.
Plan
Oper. Deacr.
0000
12.
12.00
1200
PREP
q
2
P
Move roe washer away from pit rvmplex Prepare sub bene a ph complex l move. Jack up numbers on sub base.
Prepare cad at SP24 and lay haadrte Move at complex await ftom sub base antl mbve sub bass away frem well bay. Lay
mallmg beards far sub and pits Spot sub base over well. Spot pit next to sub
f '.D
00
12.00
2409
PREP
A
2
P
him pit complex Fla up rig mal add imer from SK3. Leval gavel and Myner onwestade of dg antl seam line, Md rig
fear ado hit ppsbpn and install handrails and sltdwsys. Spot mak washer, catlings box. Mud pump Q. Generator #5 and
mW sdgmner shack Take on hatred of fresh ears, to all Plug in eiecNcal and service Koss. Make up Inter counts from on,
to sub. Turn on steam in sub add ng floor . Comlwe as hook up Inter compel. Cartoon bemung amuM M
Gas Readings
Avg Background Gas I%) Max Background Gas (%)
Avg Connection Gas I%)
Max Connection Gas (%)
Avg Drill Gas (%I Max Drill Gas (%)
Avg Trip Gas (%)
Mrs Trip Gas (%)
Dally Mud Volumes
rarkiAdfidemlloss
Type
Des
Volume(bb0
Hose
6.0
Lass
0.0
Tank
0.0
Cumulative Mud Volumpas
Atels Volume(nbb Hole Volume(bbU Additions bbl) Cum Addtllona RdU Loma(bbU Cum Losse-(bb8
3760 3760 0.0 00 1,L...
00
Daily Contacts
Finished
Contact Name
Company
Ties
Email
Office
Mobile
nimareeena be
Hmce Simonson
End
Drilling Supv.
siddrillingtiledcom
907-685715
Edi aaesenliM
Mace Graph
End
Drilling Super.
.1ddril1lr,@ami.com
90]-685-0]15
Ens representaW.
Much Bilongtor
End
Rig Clerk
AKRi9C1erMDeyonl
907-685-0722
Ent repdesanbeilve
Cory Hooghmr,
Em
HSE
End apaseMature
Lan. Arcenaaax
Ed
HSE
TOW Push
Justin Hays
Doyon DdNrq
Tool Pusher
rigl5bidayontldllm,.com
Tod Push
Ted Kroger
Canyon O hire
Tour Pusher
dgi5@doyondrilling.com
907-6850718
Tow Plan
Harold Richardson
Doyon Dalry
HSE
hdchardaon®dcyondnlling.com
6854Y796
Tool Push
Scott Simmons
Doyon DwMr,
HSE
Personnel Log (POB)
Company
Sarv.Type
Work Hlbr)
Stand-by H(hr)
Count
Note
Doyon
field sulamemendade
12.50
0
Drilling
ASRC
Clerk
12.50
1
orlIfirg
ASPIC
SOA
1250
i
SIDSupport
ASPIC
Gars Advhor
12.50
1
SIDSupport
Boxi
Mads
1260
1
SIDSupport
Well Name: SP24-SE1 OR
Wellbore Name: SP24-SEI
Well Code: 27974
Job: WORKOVER
WCEI Level: 3
Daily Report
Date: 7/31/2019
Report #: 1
Page: 2 of 2
Personnel Log (POB)
Company
So,. Type
Work H(hH
Smnd-0y Hlbr)
Count
Note
Nmmem Oltelld seouceoF
Fueler
12507—M!'poR
Wild Well Control
Hc9 Top
12W
1
Unlling
AC$
Ei,trmo nml
1250
2
SID Supped
ASRC
Co.,., We
1250
2
Dulling
8...
HSE
1250
2
SID Support
Doyon
Tool pushers
1250
2
Dtllling
Doyon
HSE
1250
2
Grilling
HaWbuten
Mud Lo00%s
12.50
2
Onlling
Ml Seam
Mud Engineer
1250
2
Unit,
Vote,(BHGE)
WellHead
12.W
2
Dulling
SLB
Cement1250
2
Dulling
commuznoa
Lo,sti
12.50
4
SID Supped
MI Swam
Mutl picot
12W
B
Drilling
pUmell
Secudty
f2so
8
SID Support
Ml Salam
WIF
12.50
8
SID SUPpod
ESS
Catenng
ISM
10
SID Support
Woolley
Tuck Conner l C..Opimku
1250
14
DrIlling
Doyon
Pop Peoctow
12.50
28
DMIing_Taml Dulling Personnel
BOP Stack & Components
Description
Start Date
Last Certification Date pros.. Ruilm, psl)
Type Meke MI
roN.(m)
PRange (ps0
I Lest Cert Dam
Slow Circulation Rates
Pump Nommen: Make:
Morel:
Slow Date
Liner St. (M)
Volume Per Stoke OveNide(bblletk) Max Pres.re(psi)
te
Dath(hKB)
DepEm!Date
Slow Slidstmkaa
(spm)
p(p50
Eff (%) OFlow law)
Daily Bulk
Supply Item Deseriptloe uipmonl
Jult Label:
Gal
Unit Size: t
Note:
Date Consumed Received
Returnetl
Cum Cmummetl
CUMRecphed
Cpm Returned
Cum On Loc Note
]21f201B ]94.0 ]s4D
]840
]94.0
0.0
o0
supplYltem Descrlpflon: Mud PIaM BDNBrS
Untt Label:
Gal
Unit Bite:
Note:
Date Consumed Recelvetl
Returnetl Cum Consumed
Cum Recelvetl
Cum Returnetl
Cum On Lou,
]21.019 1980. 1980
1980
1980
OD
OD
]Note
Supply ftem Descri on: .0 Fuel
UnR label: gal us
Unit Size: 1
Nom:
Dale Consumetl Receivetl
Returnetl Cum Cpovsumetl
Cumeecelvetl
Cum Returned
Cum On La Note
66]0 12,4]0.0
66]0
f2,4T0.D
00
11,803.0
S ppl, it
Supply Ilam Oesetiptlon: Pog Water
WI[Label: bbl
Unit size: I
Note:
Date Consumetl Received
Returnetl CUm nsUmetl
Oum Recelvetl
Cum Retortion
CUm On Loc Note
7131.019 24.0 2]0.0
240
2100
0.0
246.0
sumlylmm Deecdpbon: WFeoile.
Unit Label:Gel
Unit Size:
Note:
Date Csumetl Rectl
Remnetl
C2.- Committed
Cum Received
m n Loc Note
21az.o azoeive
o
oD -
00
supply Item Desedpr.: W6 m i.cMd Dleael
Unit Label
Gal
Unit size:
Note:
Date Consumetl Received
Returned Cum Communed
Cum Recelvetl
Cum Returned
Cum On Loc
Nole
I21n919 I.oa
0.0
0.0
OD
00
Last Authority Visit
Date Tot in.. Nb, Total LN.C. number comment
STOP Cards Submitted
company
Y Rpm
Corn
Doyon Onto,
]
PJS S'S
Doyon Drilling Inc.
7
COW
Dayan Dnlling Inc.
]
HRWS
Doyon Drilling Inc.
9
Sate C.M.
MI Symeo
8
RIR's
MlSweco
9
HARCIJSA
Genera/Notes
Comment
Well NameOR
:
Wellbore Name: e: SP24 SP24-SESE1
Well Code: 27974
Job: WORKOVER
en ni WCEI Level: 3
Daily Report
Date: 811/2019
Report #: 2
Page: 1 of 2
Well Header
ParmltlCi ncession N'
Operator Subaitllary Initial "he. Code
ADL338583
ENI PETROLEUM ENI Petroleum Cm Inc
"Way Tame Eumbentn(ftt Ground
Level(N) FletFlang. 00 RKB. eaaa Flange Do RKB- Tuhing lanol(ft)
5393 0.00
17.18 3675 31.89
Rigs
Rig Neme
CpnVaetor Rlg Type Rig Num Rig Stett Dale Rig Release Date
RIG 15
OOyON 1%2 RIG 0723 7202019
Daily Information
Weather
Temperature Wind Days LTI(days) Drya RI (tlayq POB
Cloudy
462 WSW®30 to 43 MPH 65900 mom 103.0
Safety Incidents - Near Miss
Data Category
Type Subtype Severity Cause Lmdtime7
Comment
Safety Drills
my. Until Next Check
Type
pOocur
Last Data
Next Data
(days)
Camp Ire Do"-
111
&1 19
1013020 9
90
Rig lnepeduon
281112019
822019
1
Safety Meeting
2
W112019
821019
t
TTCerap Evacuation Dd0
1
P3112019
10292019
89
Casings seat
Cos. Type OD (In)
ID (in)
Crede
Top Mike)
Bottom lttKd)
TVD Got IVKB1
Landing Date
20
1825
X65
00
i 0
I'm
2/242014
CA81NG 1338
FE"
1242
LBO
90
2,907.6
2449.5
322014
CASING 95/9
8.84
L-80
41
5237.0
3,9199
3/82014
LINER 512
483
L60
5,134.1
15.2360
40220
3)182614
Last Cementing
Cementing Start Date: 3Yd12014 Sam,
ING. 5,237. tiles Comment
StgA top lftKB)
I Top Meas Math
I atm lfl l
Co.
I 3,160 0
Sonic
413] D
PT lines 10001 3 50 0 psa. Pump 110 blue 10.5 pug Mud Push @ 5 bpm, 220 psi, Btm Plug, 85 bola of 125 Rog Lead
cm1 4.3 bpm, 170 psi, 50 able of 15.8 ppg Tail amt 1114 3 bpm. 150 psi, Top Plug. 10 this FW, 3]0.7 bass of 9.2
1
pug LSND mud Q e- 2 bpm. 520 poi, Bumped Plug and pressure up to 1020 psi for 5 min. Floats held. CIP @ 0417
M1rs.
2 4,73].0
5,2630
Job Information
Job Pha>e Planned Staff Dere Start Dae End Data Ps0 red. (days)
WCRKOVBR )/312019011.00 ]2120t900:ge 0.00
Daily Summary Operations
24h Forecast
Finish himuning thou pans, Tess GORE. Rig down and bmw down last equip- Rig up GBR, pick up and ran in hole with 2 7AP DP.
24b summary
Complete rig up and harming around ng and out buildings
Pressure test Ones, fake on 9.0 ppg brine Rig up and bullhead 1600 bbd ®86pm, Mondor well and bleed off tram 10 psi to 0 pal, nP pressure build up
Install CPV. Nipple down tree and nipple up ROPE. Change am Insist rams to 271' X 5'variable mark
Upstate. at 7000
Testing BOPE.
Time Log
start
End
Cum our
Time
Time
Dur (hr)
(ho
Phase
Oar.
Act
Plan
Oper, Descr.
G090
Cable
3.00
3 W
W O
A
1
P
Continue rig up and5itaining around dg add out bmltlmga
OR 00
0990
650
950
W 0.
A
1
P
Fill plts wut 9.0 stag Enna, rip up an well with choulating lines, test high pressure lines on rig to 3500 per While flout egging
P
0930
14.30
5.00
1450
W O
M
9
Sgua ped tubing W s 31, Pressure lest Imes 2000 pa. Mail SO Ppm ping down 81A
am m 9 p9. trivalve lull heading w ic MO ps, h
950 bbl down IA Bbpm 360 poi, add down pumping al aw
bbl away, to psi
imbour
toluol, nd 190 ad to 6
en born e,brag and IA Mondor well. per throe fee psi f and annular, Menti o6gaas fl bleed tank to T pal through
tan
112' hose, slwi m and dm up 1" bleeder hose Bleed onto 0 pal boID tubanp and ainmlua. No pressure brag up.
to O t preadi
14.30
00.
2400
W.
5
P
nstali back pressure onve in hanger. Nipple doom tree antl move to sVpmg area. ermin de eau line aM rack retainer and
test dao Rig up high Pressure neer and BOP stack. Install HCR, mad ml dw.te vpNes and high pressure bases on pnmary
aM secondary. Install koomy hoses, flow We arW low pressure user on ermular. Charge out lower roma tram 4 S' X 7° l0 2
71' X 5" Mai 2 718° handling eWlPoram to rig fear
Gas Readings
Avg Background Gas (%)
Max Backgrountl Gas (hl
Avg Connection Gas l%)
Max Connection Gas (%)
Avg Drill Gas (%)
Max Drill Gas I%)
Avg Tap Gas (%I
Mak Trip Gas (%)
Wady Mud Volumes
TanWAdifiloniLoss
are
Des
Volume(bbp
Hole
6.11
Loss
1,0080
Tank
43B 0
Cumulative Mud Volumes
Active Volume pabdi note Plume (lit 1
Atltlthan. gulp Cum Additions (lbs Losses (bbp cum Losse. (bra)
814.0 318.0
0.0 0.0 1,000.0 1,000.0
Daily Contacts
Position
Contact Name
Company
Title
Email
Office
Mobile
Edi representative
Bri Simonson
Em
Drilling Supe.
siddollingthima
907685-0715
End depersentauss
Mike Grubb
Ent
Drilling Sup,
siddnllingl5henicom
907685-0715
Em representative
Muth Ellingon
End
Rig Clerk
AKRigCledsDoyonl5@eni.com
9076850722
Ens represedauw
Cory Houghton
Can
HSE
Ear rebrommodive
Lwis Arttnesux
Em
HSE
Ens repradmist.
Mark Huller
End
HSE
Tod Push
Justin Hays
Doym Doug,
Tool Pusher
rg15®doyontld1lldg.com
Tool Push
Ted Kluwer
Doyon odkng
Tour Pusher
rigl5®dnyondrilling.com
907685-9716
Tool Push
Heroal Rudurdsor
Doyon Drill,
HSE
mvhamson@doyandrfllingeom
6854796
Trot Push
Scott Gammons
Doyon Or4bg
HSE
Well Name: SP24-SE1 OR
Wellbore Name: SP24-SE1
Well Code: 27974
Job: WORKOVER
WCEI Level: 3
Daily Report
Date: 8/1/2019
Report p: 2
Page: 2 of 2
Personnel Log (POB)
Company
Sow, Type
Work H(hn
Sunni H(br)
Count
Note
Doyan
Field Supe iiAe dd nt
12.50
0
Drilling
ASRC
Wei
12.50
1
DNling
ASRC
SDA
1250
1
SIDSupport
Apic
Cranemisser
1250
1
SID Support
Beacon
Medic
12.50
1
SID Support
NONhsm 011fuld Services
Furaer
12.50
1
SID Support
WIM War Canhpl
Hol Tap
12.50
t
Drilling
ACS
EnwomeMal
1250
2
SIDSUpport
ASRG
Compir"Man
1250
2
Wine
Doyon
TUWpuahers
125)
2
Dulling
Doyon
HSE
12.50
2
Bulling
Hallkueter
Mud Loggers
12.50
2
Unit,
w Swaco
Mud Engineer
1250
2
Drilling
Vegas (SURGE)
WellHeatl
1250
2
Drilling
SLD
Cement
1250
2
Dtllling
GDR
Cash,
12.50
2
Dnling
Reason
HSE
12.50
3
SID Support
Compelards
Logislk
12.50
4
SID Support
MI Swam
MW Plant
1250
5
Drllling
Purcell
Security
1250
6
SID Support
Ml Siemens
WIF
1250
6
SID Support
ESS
Corsi
125010
SID Support
Wei
Track dMer/Deane operate+
12.50
14
Drilling
Oayon
RV Pereonnei
12 W
28
Drilling_ToDI Drilling personnel
BOP Stack & Components
DeacrtpTlpn
stauttlate
Last Certification Date pressure Rating (psi)
Type Make
Madel
ID None(in)
IsRaage (gag
Last Cert Oats
Slow Circulation Rates
Pump Number: Make
Model:
Start Oat Entl Gate
Liner Side (in)
Volume Per Stroke Override lbbllsik) Max Pressure (psil
Data Oepth(aKG)
Slow Spd
strokes lspm)
P(pn)
Ek(%) OFlow al
Daily Bulk
Supply Item Ceecnpaere Equlpmmd
Fuel
uwtuwt.
Gal
Udi Sire 1
Not:
Date Donsu.no
Receive.
ReturnedCum
Consumed
tum Received
OUm Returned
Cum On Lac Note
&112019 581.0
5810
13)5.0
1,3750
00
09
Suppty Item Oeepription: Mutl Pard
Sogera
Unit 1-0i:
Gal
Unit Size:
Note:
Data Dunsumetl Receivetl
Returnetl
Cum Consumetl
Cum ReeeWetl
Cum Returned
Ca
Cum On Loc Note
31 198 0 198.0
395 0
396.0
0.0
Supply Rem Desnripaoa: Rig Fuel
UmY Label:
gal us
Unit Size: i
Note:
Dam 1C.Irsenumetl Receivetl
Returned
Cum Consumetl
Cum Receyetl
Dust Returnetl
CUm On Loc Note
6n12019 8870 e0
4,5540
12.470.0
0.0
ID.916.0
6u py Item Descdptlen: KM Water
UnIt Label:
bbl
Unit Sixe: 1
Note:
Dat Consumetl Received
Returnetl
Lum Consumed
Cum Receivetl
Gum Returnetl
Cum On Loc Note
8/1/2010 44 0 0 n
Seo
270.0
0.0
2020.
supply Item Description: WIF Borers
Unit Label:
Gel
Unit since:
Note:
Date Consumetl Receivetl
Returnetl
Cum Consumetl
Cum eased
Cum Returnetl
Cum On Loc Note
8/iR019 420 420
84.0
84.0
00
00
Supply llem Oesmiptlup. WIF lnleated Diesel
wt Label:
Gal
Unit Size:
Note:
Datu Consumetl Received
Returnetl
Cum Considered
oum Recelvetl
Gum Returned
Cum On Loc Note
8/1/2019 0.0 00
0.0
0.0
0.0
0.0
Last Authority Visit
Date Tot hung. Nbr Total I.N.C. number Comment
STOP Cards Submitted
Company
ORM
Com
Doyon Drilling
15
PJSM'S
Doyon Dulling Inc.
18
Sete Card.
Doyon Drilling Inc.
15
HRWS
Doyon Drilling Inc
15
COW
Ml sera.
8
RIR's
Mi Seeco
9
HARGJSA
General Notes
comment:
p� Well Name:1 OR
Wellbore Name: e: SP2SP24-SESE1
Well Code: 27974
Job: WORKOVER
en i WCEI Level: 3
Daily Report
Date: 8/2/2019
Report #: 3
Page: 1 of 2
HeaderivConcession
N° Poeratpr SubsitlUry Itlal Lehee Code
88563 ENI PETROLEUM ENINIPAidumCo. lana
First
Ta6k Etmationdu Gmond Love, in Firs[Flange (ft) RBe-Base Made hig RKB-Tubing Spool NQ
000
3655me
canveator Rig Typa ig Num Rig Start Dateg Release Oam5
E
DOVON LAND RIO 0723
Informationer
Temperature(°F) WindDays LTl(dsys) Days Rl pays) POB
Cloudy 4)6 WSW@20 MPH 65107 65100 1140
ty Incidents - NearMissCategory
TypeSubtype Severty Cause Luxuriate?
ent
Safety Drills
Type
'Occur "edged.
Next Date
Days Until Next Check
(days)
BOP Paudgen est
1 82@018
&912019
Camp Fare NU
1 8112019
1CoU2019
89
free Drill
1 &L2(119
8/152018
14
RJR hnpec0on
3 6122019
Boni9
1
Safety Meeting
3 W12019
0132049
1
TT Comp Evupsodsn Dral
1 7131 WIS
10,29'019
88
Casings seat
CaP.Type
Do (in)
ID (in) Grade
Top U11413)
Bottom(ftKB)
TVO Bot(ftKa)
Landing Data
O
2
1825 %
00
1611.0
1fi00
2241D14
CASING
1318
1242 LBO
00
2.9000
2,441 1
3122014
SING
9541
8Be L-80
-01
5.23]0
3,919.9
3812014
LINER
512
4.83 L-80
5,134.1
15,2380
4022.11
31182014
Last Cementing
cem.nhng start Date: 34g2ga String: SING, 523(rg(8 Comment:
Sig X
Top (ftl®) Top More Meth Bbn UIKB)
COm
1
3. 800 San's 4,73] 0
PT lines 1000/ 3500 poi. Pump 110 obis 10.5 ppg Mud Push @ 5 bpm, 220 psi, Bim Plug, 85 'bible of 12 5 ppg Lead
cart @ 4.3 bpm, 170 psi, 50 bola of 15.8 ppg Tag cart @ 4.3 bpm, 150 psi, Top Plug. 10 bels far. 378.7 bots of P2
ppg LSND mid @0-2 bpm, 520 psi, Bumped Plug and pressure up to 1020 psi for 5 min. Floats held CIP@0417
is
2
4]JZO 5,2610
Job Information
Job Phase Plarmatl Start Date Start Date End Date PSO Duration pays)
WORKOVER ]242'19 07.00 L3M2o190000 0.00
Daily Summary Operations
Min Forecast
Wash down wpm 2 718° OP F.2,894cleanout piping to top of EVO plug -3100'. Pull out of hole 27/6'. PU GS spear and ratnevel BHA. Run in hole picking up 2 718- pipe tram Woe shed to top of EVO. engage
spear and pull out of hole won EVO plug laying down OR
24h Summary
Complete NU ROPE, RU, test BOPE 25043000, RD test equip and blow dawn goes Run In hole with builnoee W 2 Dfi- pips far tubing gaabbal T2,S94'. Changing out bales.
Operation at 07.00
P00H with 2 718" drill pipe @ 3,g2P MD
Time Log
Short Endcamear
Time Time Dur(hr) lhn Phase Oar. Act Plan Oper. Deac,
00:00 02:30 1 2501250 W 0 C f P 'soli to -
measures and center stack, among hale cover around nseh install m 'dead o x, grease choke man old, nate I fill up
hose on annulus A
02:30 O5'.00 3.50 600 WO C 1 P Mekeup27A6'testiva.pntl loydownforlateruse. Rrg upolasl equrpmenl.imte Eost tied. lint 5°ostlalnl flaotl
stack add drake mamfold with water, shell teal, good test
0600 330 ].W t350 VE O. C 12 P Test SOPE wlS& 2 IN test lomu 25tN3000. host w¢ness wanred'oy AOGCC Rep Jeff Jarrea.
i 15:30 2. 1550 W O C t P ogmpment. blow tlmvn ones. D ram stack. pu B V end blankang pug
15'.30 2200 650 22M WO 13 4 P PJRlKRIg.p27Aypdg.hpmdImg Make up full nose aM X-C on 270 pare an run m M1ole T2,8W
2200 0000 2. 24.00 O M 20 F PJSM Al2,694' MU sop and longe out to rang hales tar ability to leads onto 2 718' pipe. ka up and ins II XC) antl bead
Fit
Poured Ino anmdus A in the las[ V baa.. 10 ppg bnne=10 beat Max gas 24 hours=2 imus.
Gas Readings
Avg Background Gas (%)
Max Background Gas (%)
Avg Connection Gas (%)
Max Connection Gas (Td
Avg Drill Gas (%)
Maz Drill Gas (°/)
Avg Trip Gas(%)
Max Trip Gas I%)
Daily Mud Volumes
TanWAdderstall ois
Type
Des
Volume (bbl)
Hale
60
Laos
70.0
Tank
6290
Cumulative Mud Volumes
Acute V.1turs. (bbl) Note Voiudrce (boll Atltl ms (bbl) Cum Additions doing Loeaes (bop Cum Laasea Ri I)
1.005.0 3]80 0.0 00 '190 T07a0
Daily Contacts
Position
Contact Name
Company
Tito
Email
Office
Mobile
of reprasemalive
Braes Smrnwn
En[
Trying Supv.
sitltlrllgng@aol.com
907-605-0715
Em remesenotiue
Mae Gmbh
End
Drilling Supv.
siddrilling@......
907685-0715
Em mpresematrve
Milch Sah'toc
Eni
Rig CIDA
AKRigClerk,Doyonl5@enLcom
907685-0722
Em open a sides.
Cory Houghton
Evill
HSE
ED, mpresentatoo
Lasts Arcernasx
ED i
HSE
Em representative
Mars Hubhr
Ent
HSE
Tod Push
Justin Nays
Doyon Drilling
Tool Pusher
rigl5@doWnddilingcom
Tool Push
Ted Kruger
Canyon gaining
Tour Pusher
rig15@dayondrilling com
907-685-0716
Tool Push
Harold Ricsartleon
Canyon Odlkng
HSE
hdchardson@doyondnliing.com
605-0796
Tod Push
Scoa Simmons
Doyon DNYng
HSE
Well Name: SP24-SE1 OR
Wellbore Name: SP24-SEI
Well Code: 27974
Job: WORKOVER
WCEI Level: 3
Daily Report
Date: 8/2/2019
Report #: 3
Page: 2 of 2
Personnel Log (POB)
Company
So' Type
Work H pr)
Stand-by H(hn
Count
Not.
OoYoo
Fred Supminientlent
t2.W
0
Drilling
ASRC
Clerk
12.50
1
Drilling
ASRC
SOA
1250
1
SID Support
ASPIC
Cram Ativisor
12.50
1
SIO Support
Seamn
Mstic
1250
t
SIO Support
NoiiMm Caudal Sc.Fuekr
12.50
1
SID Support
Vako(SHOP)
WetlHeatl
1250
1DnllIlg
Wild Well Carom
HM Top
12,50
1.
Drilling
Baker
Frshllg
12,50
1
Drilling
ACS
Emummentel
12.50
2
SID Support
ASRC
Co."Man
1260
2
Delling
Doyon
Tool Pushers
1250
2
Calling
Onto.
HSE
12.50
2
Drilling
Heiated n
Mutl loggers
12.50
2
Drilling
Ms...
Murl Engineer
1250
2
Drilling
SLB
Cement
12.50
2
Drilling
eeacon
NSE
12.50
3
SID Support
Su
GSR
Casing
12.50
3
Drilling
Nalllburton
Blick floe
12.50
3
Delling
Competence
Laglsbc
12.50
4
SID Support
Baker CeMulift
ESP
1250
6
Dri%leg
MI Swaco
"Plant
12.50
a
Dulling
Pamog
Sacuey
12
6
SID Supped
MI Swaco
WIF
12 raW p
B
SIDSupport
ESS
CateTruck
12.50
12
SIilling rt
Worley
dg
truck tlNveNCmne operator
1250
14
Drilling
Cryan
RIg Personnel
1260
28
Drilling Total Drilling Personnel
BOP Stack 8 Components
Description
Sfan Date
Las( CerBficabon Data Praasum Rating esti)
Type
Make Model
ID Noun(in)
I
PRange(pai) Last Cert Date
Slow Circulation Rates
Pump Number: Make:
MOEet.
Start Data End Date
Llrmr Size (m)
Volume Per Stroke Overritle limpedMax Pressure (psi)
Dale Minsk piRB)
Slow Sptl
Stokes (spm)
P(psU
ENl%) 0Plans, (gpm)
Daily Bulk
Supplyltem Deseriptbm Egmpra Fuel
Unit Label:
Gal
Unit Size: 1
Note:
Date Consumetl Receivetl
Refurnetl
Cum Consumetl
bum Receiv
Gum Re[umetl
GUm On LOC Note
6212019 4540 4500
1,.^,250
18250
DO
00
Supply Item Desnip0pn: Mud Paul Id.o.
Uel-nel:
Gal
tall Size:
Note:
Date Consumetl Receivetl
Refurnetl
Cum Consumetl
Cum Receivetl
Cum Returned
con On Loc Note
N1,2019 1980 198.0
6840
68x,1
00
0.0
Supply Rem OescNptlon: Rigroei
Ur6t Labe,.
gal us
unit61ze: 1
Note:
Date Consumetl Receivetl
Returned Cum Consume
Cum Rmelvetl
Cum RefuNletl
Cum On Loc
Note
522018 994.0 0.0
2,5400
12,4700
00
8.822.0
Supply tem DascNpOam Rry Water
Unit LabeL bbl
Unit Size: t
Note:
Gate Consumetl Received
Returned Cum Consumed
Cu. Raoervetl
Cum Retumetl
Cum On Loc
Nofe
62:'2018 43.0 0.0
111.0
270.0
00
1590
Supply Item Description: WIF Sellers
.."t -lied:
Gal
Unit Size:
Nofe:
"to Consumed Receivetl
Refurnetl
Cum Consumed
Cum Receivetl
Cum Refurnetl
Cum On Loc
Note
81212019 42.0 42.0
126.0
'SS0
0.0
00
Supply Item Desafpgon: WIF lnjedetl Oleael
UnBLabni:
Gel
Unit Size:
Note:
MDale CoReceived
Returnetl
um Consumetl
Cum R...lend
Cum Retumetl
Cum Onl.ec
Nofe
019 0.0nsumetl
0.0
D➢
0.0
0.0
100
Last Authority Visit
Date I Tot leap. Nbr Total I.N.C. number Comment
STOP Cards Submitted
Company
p Ron
Com
Doyon Drilling
6
PJSM'S
Doyan Delling Inc.
T
Safe Cards
Doyon Drilling Inc.
6
HRWS
Doyan Onling Inc.
6
COW
W Swaco
0
RIR's
Ml Swaco
0
HARCIJSA
General Notes
Cramped:
Well NameOR
:
Wellbore Name: e: SP24 SP24-SESE7
Well Code: 27974
' Job: WORKOVER
eno WCEI Level: 3
Daily Report
Date: 8/3/2019
Report #: 4
Page: 1 of 2
Well Header
PermlUeoncesslon W Operator Subsmlary Ibibal Lenee Cotle
ADL -380583 ENI PETROLEUM ENI Pelrolaum Co Inc.
Rotary Table Elevatlon(ft) Ground Level(!V First Flange(N) RKB-Base Flange IN) RNB-Tubhg gra ((ft)
5393 0.00 17.18 W 75 3184
Rigs
Me Name Contractor Tigan Rig Num Rlg Bmrt Data Rig Release Data
RIG 15 00YON IAN. RIO 0]23 7120!2019
Dailyinformation
Weather Temperature I -FI Wind Oays LTl �tldyS) Oays Rl (day,) POB
Cloudy Rain 41.3 E@28 MPH 55200 65200 113.0
Safety Incidents - Near Miss
Date Category Type Subtype Severity Cause Lost time?
Comment
Safety Drills
Type
Days Until Next Check
umulamr DrUl
pOccur
1
Las[Oete
&3201]i
Next Data
19
(days)
14
BOP Pressure Tasl
1
84bQ019
81%'2019
6
Camp Fire Deal1
13112019
10/302010
130
Eve all
1
&22019
8/1812019
13
Rig Inspection
4
81WO19
&412019
1
Safety Manor,
4
8132019
8/412019
1
TT Camp Eamped n DMI
1
7/312019
102912019
87
Casings seat
Cas. Type
1 OD (n)
IDIIn)
Gratle
Top(ftKB)
Bottom (ftKB) TYD Bot IftKBi Lantling Oafe
CA31 G
20
18.25
X-fis
00 18 0 160.0 22412014
CASING
133E
1242
L30
0.0
2.90.0 2.449.5 3122014
CARING
9518
8.84
L60
-0.1
5.23]0 3,818.9 &&ZOib
LINER
512
d.83
L -BO
5,134.1
16,2360 4.022.0 WIM014
Last Cementing
Cemendng Start Date: VgDai Shing: CASINC..237OfIK6 Comment:
S[gp Top ill Top Meas Meth
Btm ptKel
Com
1 3,788 0 Sonic
4,]370
PT Imes 100013500 psi. Pump 110 bbls 10.5 ppg Mud Push @ 5 bpm, 220 psi, Ron Plug, 85 this of 12.5 mg Lead
cmt @ 4.3 bpm, 170 psi, 50 bbls of 15.8 ppg Tall cmt @ 4.3 bpm, 150 psi, Top Plug, 10 bba FW, 3]8] bbla of 9.2
Ppg LSND mud @ 8- 2 bpm, 520 psi, Bumped Plug antl pressure up m 1020 psi for 5 min. Floats held CIP @ 0417
m,
2 0.73! 0
5,263.0
Job lnlormation
Job PM1ase plannetl Start Date Smrt Date End Date PSD Duration(days)
WORKOVER 7/31201800:00 Z3t20 an C0 000
Dally Summary Operations
24h Forecast
Continue POOH FI 692MD Iai dawn 2 ?I6' UP, L. spear assembly. 8 fish Clear floor. RU ki deumplele SP24, PU landing joint, BOLOS, pull hanger to floor, LD 4 5" completion
24h Summary
Pump In hole from 2.891' to rap of fish at 3129'. Eveep and,lophad, bottoms Up 3 Umes. Pull out of hole flying down 2 718" poll pipe. Pickup antl make up OS speer aM run In hole on 2 718" dnll Pipe antl latch on
antl to EVA Plug at 3.129. Wrseat EVA Plug and pun out oriole T1692' laying down 2lior pipe m PrPe ahed.
-6raeonet07.DD
Rigging up W pull tubing Clanger
Time Log
Stara End Gum Dur
Time Time Do, gar) @r) Phase Oar. Act I Plan Opec Dese,.
0000 0030 050 0.50 W.0 M 1 P Change meson power tong head, make up pumPmg sub X-C assambty
0030 woo 5 50 600 W.O M 4 Pupop In hale from 289m, to 3112' 36pm 330 psi PO to 308% and back deem street pumping tagged XII at 3102' Pick up W
3082' and wash back down m 3129'taggea, hall with 21,. pick W 1' and Pump Hovis scene, simple 3 options up at 41mom
14M pal, hole cleaat. shut down pum, moats, wall for 15 mm -stab,
13 o0 7 00 13 CC VV—o— M 4 P Pull out of hole laying down 2 71r` tubing tal down -0 and bull nose
1 Uo IS30 5 0 18.50 W0 M 4 P pick up me, ani up GS speer assembly antlrunin hos, T13.IIV Wash down Ft 3, 111 13.132'x122 gpm. 750 psi.
18 30 1900 50 19 Go Latin oa t0 E O slug, She ammmr and monitor pressure inn 30 mmutes wMte lu
P 0 Pressure equalisstl stove antl slaw
plug, no pressure harm up observed
1900 U0(111 500 2400 TO M 4 P Release EVOp g. PUU put of hole wUh2h'8' Prop pipe FIA T/fi92', EU 5k
PampedatperlrlaWSA last24 hoursd90ppgn:ne=118bbIu, Maxga,241ioum=Ounds.
Tota19.0 bane W hole=188 We.
Gas Readings
Avg Background Gas (Y.1
Max Background Gas i%)
Avg Conneebon Gas (%)
Max Connection Gas (%)
Avg Drill Gas (%)
Max Drill Gas (%)
Avg Trip Gaa (%)
Max Trip Gas (%)
Daily Mud Volumes
TinkfAddltbNLp
Type
Dea
Volume (Wil,
66
Lasa
so
Tank
4]6G
Cumulative Mud Volumes
ActNe Volume (bh) pfe Volume bhp Add U. (bM) Cum AUdlflorn (bhp Lasses (bhp Cum Looses (bbl)
8520 3]80 art 00 118.0 11880
Daily Contacts
Position
Contact Name
Dennis,
Title
Email
Dan.
Mobile
Eni represenlalwe
rota bnonspn
Enr
Drilling Supv.
siddnlling@eni.com
907885-071
Ens reareeenEsed
Mike Grubb
Eel
Drilling Supv.
sddrilling@enkcom
907-685-0715
Eng hose,
Mitch uUr
EM
Rig Drink
AKRigCIeMSDoyenl5@eni.com
90]-685- 0]22
Erl mpreeentlrvs a
Cory Houghthon.
5m
HSE
Eni repreaeMaUve
Louts Arpred x
Ene
HSE
En, rearesumber. a
Me* Nudger
Ens
LEE
Ted! Push
JUBUn Hoye
Doyon DN"
Teol Pusher
rigl5@dopraffiling.com
TOW Push
Ted l4uger
peen Drin,
Tear Pusher
rg15@doycrmLing.com
907-685-0716
Well Name: SP24-SEI OR
Wellbore Name: SP24-SE1
Well Code: 27974
Job: WORKOVER
WCEI Level: 3
Daily Report
Date: 8/3/2019
Report 9: 4
Page: 2 of 2
Daily Contacts
Pocono Contact Name
Company
Ties
Ewell
Office Mobile
Tool PushHoroid Rlchance.
Trial
Dpyoa Dn�Ang
HSE
hricbertlspn�tlpypntlrilling.mm 685-0796
Tool Pop Snnmons
Doyon Dnlung
HSE
Personnel Log (POB)
Company
Serv. Type
Work H(I
Stand-by H(M)
Count
Note
Doyon
Fuld SUDellnteMenl
12.50
0
Drilling
ASRC
ask
1250
1
Drilling
ASRC
SOA
12.50
1
GID Support
ASRC
Crane Artmi
1250
1
SID Support
a..
Medic
12.50
1
SID Support
Norman 011felld Between
Fueler
12.50
1
SID Support
Vetco e3HGE)
WeIfliai
1250
1
palling
Wild Well Dump]
Hot Tap
12.50
1
Dding
baker,
Fishing
1250
1
Drilling
ACS
Envlromemal
12.50
2
GID Support
ASRC
Company Man
1250
2
Drilling
Doyon
Taal pushers
12.50
2
polling
Doyon
HSE
12.50
2
Drilling
HalInistan
Mutl Loggers
1250
2
Drilling
Ml swam
Mud Engineer
12.50
2
Dtllling
SLB
Cement
12.50
2
polling
Beacon
HSE
1250
8
GID Support
GER
Crim,
12W
3
Drilling
Campanili
LoguHic
1250.
4
SID Support
Hell,buren
Slick Lina
12.50
4
Drilling
Baker Cenfir"
ESP
12
6
Drilling
Ml Swam
Mud Plant
1250
w
8
Dtllling
P.1
Secealy
12.50
6
SID Support
MI Swam
WIF
f2.50
8
SID Support
ISSWad
Catering
1250
12
GID Support
Wotley
TmcK driver/ Co. operator
12.50
14
Drilling
Doyon
RD Personnel
1
12.50
28
Drilling_Totel Drilling Parser -1
BOP Stack & Components
Damnation
Smrc Date
Lasf Certification Date Pressure Rating (psi)
Type Maxe Model
ID Nom (In)
PRange (psQ Last CertDate
Slow Circulation Rates
Pump Number: Make:
Model:
Start bate End Date
Liner Size (in)
Volume Per Stroke Override lbbllsfk) Max Pressure(psi)
Date Depth INKB)
Slow Bptl
Btrokes (apm)
P(psll
0Flow (gpm)
Daily Bulk
Supply Item Description: Equipment Fue
Unit Label: Gal
Unit Size: 1
Note:
NDate Consumetl Receivetl
Returned Cum Consumetl Cum Recelved
Dom Retmmd
turn On Loc Note
nei9 1,105.0 1,105.0
29300
28300
0.0
00
Supply Item Description: Mud Pont Boilers
Unit Label:
Gal
Unit Size:
Note:
Date _ Consumetl Receivetl
Refurnetl
Cum Consumed Cum Remived
Cum Rrmrmd
Cum On Loc Nate
8/!2019 198.0 1980
7920
J9i.0
p.0
0.0
Supply Item Description: RIB FuaI
UIn labai:
gel us
Unit Size: 1
Note:
ata Consumetl Receivetl
Returned
Cum Consumed Cum Rewivetl
Cum Refurnetl
Lum On Loc Nofe
802019 1,039.0 00
3,56].0
12,4]0.0
IS.
8,883.0
Supplylannoee, do., RI Wetu
UMI Umue
bbl
Unit Size: i
Note:
Date Consumed Receivetl
Refurnetl
Cum Gotrsumed Cum eeelved
Cum Romrnetl
Cum n o0
Note
N12019 1].0 0.0
1280
270.0
00
142.0
Svplyllem Dewrlption: WIF Sollero
Unit Labei:
Gal
Unit Size:
Note:
Date Consumetl Receivetl
ReWrnetl
Cum Consumer! Cum Recolvetl
Cum ReWmetl
Cum On Loc
NDte
erYY019 42.0 420
188.0
168.0
OD
0.0
Supply Item Description: WlF mtecletl closed
Unit Lebl:
Gal
Unit Size:
Note:
Data Consumetl Receivetl
ReNrnetl
Cum Consumetl Lum Receivetl
Cum Retumetl
On Loc
Nofe
el3rza19 B.5 os
0.0
0.0
00
cum
0
Last Aurnonty, visit
Date Tot imp. Nor Total I.N.L. number Comment
STOP Cards Submitted
Co."
NRpts
C.
Doyon Drilling
7PJSM'B
Devon Drilling Inc.
7
HRWG
Doyon Drilling Inc.
12
Safe Cards
Doyon DiInc.
7
COW
MI Swai
8
Rini
Ml Swem
8
HARCIJSA
General Notes
Comment;
Well NameOR
:
Wellbore Name: e: SP24 SP24-SESE1
Well Code: 27974
2t Job: WORKOVER
en i WCEI Level: 3
Daily Report
Date: 81412019
Report #: 5
Page: 1 of 2
ell Header
pnit/Conceselon N° Operator
Strendlery Initial Uume Code
L-3885in EWPETROLEUM EM PeOolaum Co. Inc.
tary Table Elevefon(BI Gmund Lavef lft)
First Flange(f) RKB-Base Flange(it) WCB-Tubing Spool hd
.9300
[Daily
1]18 36.]5 31.igse
Name Contractor
Rig Type RIg Num Rig Start Date Rig Release Data
G IS DOYON
LAND RIG 0]23
Information
Weather Temperature(°F)
Wind Days LT'(day.) Days RI (days) Ppb
Olcudy 41.0
W @ 21 MPH 653.00 65300 }11.0
Safety incidents - Hear Miss
Mt. Category Type Subtype SeverityCause Losttime2
Comment
Safety Drills
Gays Until Next Check
Type
epccm
Last Date
Next Date (days)
Accumulator Dnli
i
32019
0117ning 13
BOP Pressure Test
1
8(12019
89YAI9 5
Camp Fire DO
1
8112018
10,M2019 87
Flee Drill
1
8122019
Muni 12
Rig fbspecdon
6
wvmlg
WSMD19 i
Safety Meeting
5
8142019
8,52D19 i
TT Camp Evecuatron DO
i
inicOl9
IM912019 86
TT Ktck While Tripping DNA
1
8142019
8 52019
Casings seat
Cas. Type
OD ImI
ID pn)
Gratle
Top(ftKEg
I Bottom PIKE)
I TVD But. (ftKB)Landing
Date
CAbING
20
1825
X-65
00 160.0
i6I10
224,2014
CASING
133!8
1242
LBO
0.0 2,9000
2.4455
3122914
CASING
9518
8.84
L-80
-01
5,23]0
39199
3/8/2014
LINER
512
483
LA0
5.1341
16.2380
4,022.0
311&12014
Last Cementing
914 BillG WG, 5.23J0RK8
Top Maas Meth
Btm (RKB)
Com60.0
Sonic
4]3].0
PT lines 1000/ 3500 psiPump110 bible iD5 ppg Mud Push@ 5 bpm, 220psi, She Plug, 85 bblsof125ppg Lead
-inti @ 1.3 bpm, 1]0 psi, 50 bible of 15.8 ppg Tail amt @ 4.3 bpm, 150 psi, Top Plug, 10 bbis FW, 3]8.7 bbls of 9.2
rStaft
DPA LSND mud @ 8- 2 bpm, 520 psi, Bull Plug and pressure up to 1020 psi for 5 min. Floats held CIP @ 041]
3].0
52630hasa
Panned Stan Datestart
Date End Dale P60 Duration keys)
]131201900:00
]/3120180000 0.00
Daily Summary Operations
246 Forecast
I0g uP for rummsg new completion. Change cut bales. Pick up, make up and sevrce ESP assembly and run In hole with 414- 12,64 L40 HYD 563 tubing.
24h Summery
Center. to pall pm of hole laying down 2 7I8" drill pipe Ea39T, lay down GS spear assembly sIW EVO pig. Gear floor and ng up to de<omwete 3P24. Pick up luddl, Joint, BOLDS. Pull henget to Floorpug cut
of hole and lay tlown 416" Upong and ESP assembly
Operagon at 0700
Propadng to RUN with ESP ampktipn.
Time Log
Start End Cum Our
Time Time our Er) (M) Phase Op, I Act, Pbn
-350
Open. Descr.
0000 0330 350 W O M 4
P
Continue pu0mg out of help faymg down 2TO- drill 1IP- ham 692' W sudors, Tay down EVO plug antl SHA, char flni 2
7f6" rummng Loch,
0330 0:3 400 750 WO M i
P
pickupardareall4.5-bmbripjointherImueavec Wthrohelaphant
bunk, end 2'dmic base to ESP cable sheave Install ddp boar between spoeler aM rip Back out lock down screws (or tubing
hanger
'.30 0600 1.5 9 00 70-- 17-- 20
P
P )SM tor d reompletmn with an contracture Pull hanger to Boar 2301, up Augh, to pull floe. 1301, spring weigbt Opms4omble
peimtiatur and sears ESP cable and cap line for pulling over sheaves.
W:00 12.00 300 1200.WO. L 4
P
PUB om at Mie ham 822'MD b4.336'MD.
Note Supped hole In tubing @ 284' Per wpehne logs was not wisely observed while pulling out of hate. Past inspection of
tubing was done and no hole found
1200 1330 1.50 13.50 W . l 8
P
At 4.336 pipe began palling wet, make up X-0 and ceculabng hose, pressured up to IBM pan and sheared upper gas In
mandrel shear valve Pump 110 bbl g.0 ppg bone b clear tubing fo GLM
170 16.00 1 250 1600 Wit. 4
P
Continuo to POOH whM1 tying Fl 4,336 MO to 2,527'MD.
IBM 1890 0 50 16.50 W,O L 9
P
At 2.527 MD rigged up and pump tlown tubing and sheared beer gas lift mandrel @ 1)00 psi. Pump 1'4 mbmg wNme M
3 BPM. at 22M psi.
16: 0000 7. 2400 W.O. L 'i
P
P prying dawn 4 IM- 2.UP ubnng 2,527' MD T/96MD. Lay tlown ESP assembly and mareend
NOTE: Pumped c o annubs A laid 24 hours of 90 ppg bane= bbis. Max gas 24 hours=0 pmts
Treat 90 prig bene to Imle-416 bible.
Gas Readings
Avg Background Gas (%)
Max Background Gas (%)
Avg Connection Gas I%)
Max Connection Gas (A)
Avg Drill Gas (%)
Max Drill Gas (°b)
Avg Trip Gas 1%)
Max Trip Gas (%)
Daily Mud Volumes
Tank/AddMonlLoss
Typo
Des
Volume (660
Hole
39 0.0
Loss
2280
Tank
522.0
Cumulative Mud Volumes
Acted Volume@bl) Hole Vo oma (bM)
AddlIhmar(bbl Cum Additions, (bbl) Cosa -life Cum Loaees total)
912.0 380.0
0.0 DO 2260 1,4160
Daily Contacts
Pushed. Contact Name
Company Title
Email
Office Mobae
de mpresenmiwe Itmce Simonson Enl
D1i11mg bupv. Isimmurpiggail
90]A85-0>15
Well Name: SP24-SE1 OR
Wellbore Name: SP24-SE1
Well Code: 27974
Job: WORKOVER
WCEI Level: 3
Daily Report
Date: 8/4/2019
Report #: 5
Page: 2 of 2
Daily Contacts
Position
Contact Name
Comparry
Title
Email
oft. Mobile
Em Mrshanterve
I,"Gmbb
Enl
Drilling Sup,.
sidiftllingetieni.com
90]£85-0]15
EM humamuc.
Milch Mansion
Eni
Rig Clerk
AKRigClerksDo,m15@enI,ccm
9078850722
Em representative
Cory Houghton
Enl
HSE
She representative
Lome Arcebempi
Em
HSE
Shi mmesenia0ve
Me& Hubkr
But
HSE
Tool Push
Justin He,
Doyon Voting
Tool Pusher
r1g15@doycndrilling com
Teel Push
Ted Kreger
Doyon Drilling
Tour Pusher
rigIs@d1opntlnlling.cOm
901
The Push
Hrcw Mchanum
Doyon Dnl4rg
HSE
hrichamson®doyendrilling Dam
8850798
Tool Push
smasreem he
Doyon Di
HSE
Personnel Log (P(B)
company
Company
Be". Type
Work Har)
Stand-by H(br)
Count
Note
my.
superintendent
12.50
0
Citing
WW Weil Coned
Not Tap
12.50
.Drilling
Baker
Fishing
1250
0
Dnlling
ASRC
Chun
12.50
1
On ng
ASRC
SOA
12.50
i
SID Supped
ASRC
Crane Advisor
12.50
1
SID Supped
Bottom
Medic
12.50
1
SIOSuppoit
Northern OiHeild So..
Fuelar
12.50
1
SID Support
Vetco(SHGE)
Wellhead
1250
1
Dnlling
ACS
E.Ver moral
12.50
2
SID Support
ASRC
Company Man
12W
2
Drilling
Doyon
To.? umbers
12.50
2
Drilling
Doyon
HSE
12.50
2
Dnlling
Helliburion
Mud Loggers
12.50
2.
Dnlling
MI Serum
Mud Engineer
12.50
2
Drilling
SIB
Cement
1250
2
Drilling
Beacon
HSE
12.50
3
81D Support
HaRtramon
Slick Ube
12.50
3
Doing
Cemiummua
Legume
1250
4
SID Support
GBR
Casing
12.50
4
Drilling
Baker Cantnlld
ESP
12.50
5
Drilling
Mt Swaco
Mud Plain
1260
6
Dnlling
Purcell
Security
1250
5
SID Support
Ml Sween
WIF
12.50
8
SID Support
EBS
Cdedog
1280
12
SID Support
VJoney
TmckdlNmlCrme.perutor
1250
14
Drilling
Doyon
Rig Personnel
1250
26
Dnlling_Tatal Drilling Personnel
BOP Stack & Components
Description
Start Data
Lastcertificatire
on Date Psre suRating goal)
Type Make Model
ID H. (m)
PRange goal) Last can Date
Slow Circulation Rates
Pump Number, Nake
Model:
SUN Data E dDate
Uner Sin (in)
Volume Per Stroke Overrun oblla&I Max Preseure(psi)
Date Dep[h IflNB)
Blow Sptl
Strokes(apm)
Pme)
Eff1%) 0Flow (gpm)
Daily Bulk
Supply drum Description: Egdpment Fuel
Unit Labe:
Gal
Unit Size: 1
Note:
Date Consumed Receivetl
Returnetl
Cum Consumetl
Cum Receivetl
OUm RMmetl Cum On Lee
Note
8/4/2015 >53.0 753.0
3,88].0
3.8830
0.0
0.0
Supply Item Description: Mud Plant Boilers
Unituthl:
Gal
Unit Size:
Note:
Date Consumed Received
Rat umetl lCurnCerwarional
I Cum Recolvenal
Cum
Returned Cum On Lae
Note
814/2019 198 0 1980.
19900
99..0
0.0
10S
Supply does Desmlptlom Rig Wel
Unit Ubek al us
Unit Size:1
Note:
Date Consumed Receivetl
Returned Cum Consumed
Lum owed
Cu.
Retuned Cum On Loc
Note
8/42019 1,105.0 0.0
4,5820
-
12,4]0.0
0C
7,]]a0
Same Item Deaerl don Rg Water
Unit LaOeL bbl
Unit Bize: i
Noce:
Date Consumetl Receive0
Returnetl Cum Consumetl
Cum Received
Cum
Returned Lum on Loc
Note
014:2019 280 11.0
1540
2]00
0.0
116.0
Supply Ilam Deacdptlon: WIF 8o4eta
UnNlabel:
Gal
Unit Size:
Note:
Da[a Consumetl Receivetl
5-
Returnetl
Cum Consumed
Cum Receivetl
um
Returned Lum On Loc
Note
1e ago 4z.9
z1L
zro.o
meance.
00
0.0
Note:
Supp dem Descdpllon: WIF injected Diesel Unit Label:Ga1
Date Consumetl Received
Returned Gum Consumed
Cum Received
Gum
Returned Cum On Lae
Note
L4R019 00 00
00
00
00
00
Last Authority Visit
Gate Tot map. Nor Total I.N.C. number Cem-ent
STOP Cards Submitted
Co."
k Rple
Com
Doyon On ling
11
PJSM'S
Doyon Drilling Inc
11
HRWS
Doyon Drilling Inc
15
Safe Cama
Doyon Drilling Inc.
11
cow
MI Swam
0
RIR's
MI Swam
8
RARC/JSA
General Notes
Coherent:
Well NameOR
:
Wellbore Name: e: SP24 SP24-SESEI
Well Code: 27974
Job: WORKOVER
gni WCEILevel: 3
Daily Report
Date: 8/5/2019
Report #: 6
Page: 1 of 2
ader
nagaslDn N° operator
Subsidiary INfltl Lahee Code
3 ENIPETROLEUM
ENIPefrdeu.Co. Inc.
la Elevation (ft) Grountl Level in)
FirstFlange (ft) RKB-Rase FUnge (ft) RKB-Tub ngSpon (le)
O W
Ro
1].18 3615Rha/ 3184
Contractor
Rg Num Rlg Siert Date FOORelease Date
RIG
023formation
Temperature l"F)
noddy
Wind Days LTI(days) cd,d R1ldays) POB
429
NW @SMPH 65900 65400 1080
Safety Incidents - Near Miss
Date Category Type
Subtype Severity Cause LosF ilme2
Comment
Safety Drills
Type
Days Unal Next Check
Accumulator prOl
tae[pAle
Next Date
(days)
019
8/18018
12
BOP Pressure Test
019
81912019tame
Flue Cntl
0i9
10802019
86Fee
BullRigNspaCllen19
8/18/2019
11p18
77alM019
0188019
i
sdaryMeume019
802D19Bar"."
019
8,19/2019
14
TTCampEvacution0all
019
10292019
85
019
1128019
90
tt Kck While Tripping DAI
019
4(58019
0
Casings seat
Cas. Type
Do (in)
[Dunn)
Oratle
Top IftKB)
BoaOm(RKB)
TVD But lftKe)
Landing Date
CASING
20
18.25 X-65
00
11
1600
2/24/2014
CASING
fl"e
1242 LBO
0.0
29000
2,4485
328014
CASING
8516
689 L-80
-0.1
5.23]0
3.919.9
ffi88014
LINER
512
4.83 1-40
5.139.1
15.2380
4,022.0
3!1&2014
Last Cementing
Cemendng Sfart pate; 3/912014 String: CASING. 5,2370(tKB
Comment:
Top (RKB)
Top Meas Meth
an"(RKB)
Gom
3 80
Sonic4,73]
0
PT Imes 1000/3500 psi. Pump 110 me 10.5 Pon Mud Push @ 5 bpm, 220 Psi, Stan Plug, 85 bbls of 12.5 ppg Leadtint§4
3bpm,170psi,50bblsof15.4ppgTailcmt@4.3bpm,150psi,TOPPlug,10bblsFW,378.7bblsof92
EJob
ppgLSNDmud@8-2bpm52Dpsi, Bumped Plug antl pressure upto 1020 psifor5min. Floatsheld. CIPIDL041]
his.
4.737.0
6263.0
ormation
Job Phase Planned Start Date
Staff Data End Date P50 Duratlon ltlaya)
WORKOVER 7/312919 00 0
]13(8019 p'a, 0.p0
Daily Summary Operations
Wm Forecast
Continue to inn . hale with 4 Y,' 12.6# HYD 563 tubing FMS47A,811'. Lam out tubing hanger Test hanger seals and ESP conductivity. Monitor wail for 30 minutes Set BPV and nipple down Reck. Nippier up
tree and Pref.. passport teal
24tr5ommary
Prepare for completion. Pick up and run M hole sah ESP assembly on 4 IT 126 #, LA0, ttyd 553 tubing using Volant CRT F/surface TM 354
Nota: Was piston out of hole with 4 % ESP completion on 8142019 n0 hole in six, was found, after further twordiga09n a hots was found el -296MD tram RXe.
Operation at 77.OD
Making prepam0orls to lead tubing banker, camen0y making penehamr spin.
Time Log
Start
Cum Om
Tome
End
Time Our Re) (bq Phase Opr. Act
Plan
Oper. Descr.
0000
06:Op 6 00 6 W.0 K 1
Prepare equipment l0 run completion. lower cap We mM ES .tela from sheave In derrick enc spool up on spools in
shooting must Remove spools with used has much shoaling unit replace whr. spaols with new cap tube and new ESP cable for
completion. Remove 2*drippyre/rase and standard bunkhosefmm sheave. derma Ghargeouttopikkabales 11m1al
Volao tad and bale iw4amar s Mab9Re Clamps end equipment t0 rig floor Pull cap [me antl ESP cables over sheaves
in
down ng floor.
06:00
1100 1 5 00 11.00 W O. K 14
1 P
PJSM, p¢ up ] 625' aMoud end sin m mieryte0le Mak¢ up ESP m9tmaasemmy am inn In Mle TAR
tW
1500 00 1500 WO N 20
P
Spl¢e Mlli to ESP coda with ENl amolddan witness. Splice antl hot cap me.
15:002100
800 2300 W.O. N 4
F
Runm Mie write ESP as,ambry on a'h"128#L-80 on3bmingusirlg Voler Cmtooi FWT/3,000.30=901. Test
cap mine and ESP cable every t Opp'
Op
23:30 50 2350 W K 9
Pump Tab.gvolumeof45bbl,mf90 ppg Maem2 pm,170 ,test EW.Me.goadlest
330
00.00 0.60 29 is K 4
P
Run In hole wM 6P assembly On 4'/.'126#LA0 553 bind using dant GRT to.] F/3.000'TrSS5' Testing cap
tube and ESP cable every 1,000'.50=91 k.
Psommintoormm-0
assA ImA24 boors of 9.0 ppg bone=182 hbis. Matgas24houunfls.
Gas Readings
Avg Backgrountl Gas (%)
Max Background Gac (%) Avg Connection Gas (%) Max COnneRion Gas VA)
Avg Drill Gas (kit
Max Drill Gac (%)
qvg Trip Gas (%) Max Trip Gac IY°)
Daily Mud Volumes
TanWAddi caftoss
To
Dos
Volume (bbp
Hole
Loss
83 0
Tank
162 0
36.0
Cumulative Mud Volumes
Asks, Volume (bbl) Hole volume (bbl) Addidom (hot) Cum Additbns (bbd Lpases lbbq Cum Losses (bbl)
719.0 M3.0 00
00 162.0 1.5860
Daily Contacts
Pacific. Contact Name
Company Tlfle Email office
Mobile
can repreaanNhve terms, som us
lEm
Drilling Supv. sltlddlling905e...m 9p7-685-0]15
Well Name: SP24-SE1 OR
Wellbore Name: SP24-SEI
Well Code: 27974
Job: WORKOVER
WCEI Level: 3
Daily Report
Date: 8/5/2019
Report #: 6
Page: 2 of 2
Daily Contacts
coal
Contact Name
Company
TUIe
I Small
OfRce
Moblh
rdn depresenffiIve
rke mbb
Eni
Drilling Sur ,
addrIling@dmi.com
90]-685-0715
End mlNes
Sr;
Rig Clerk
AKRigClerksDoyoni5@eni.com
950885-0]22
EM ra obve
Go,H dighlon'
Cory Hduginan
Eni
HSE
midartnevs
Eni aepreaeMenve
Mak Hubler
Em
HSE
Tool Push
Justin Hays
Doyon
Drilrog
Tool Pusher
rigl5®doyonddlling.cOm
Tool Push
fed Kmga
Doyon
DWling
Tour Pusher
rig15®doyonddlling.com
9078850716
Teel Push
hard, Redemption
Doyon
Drilling
HSE
hdchardson@doyondrilling.com
6850796
TOW Posh
Smd Simmons
Doyon
Drllfmg
HSE
Personnel Log (POBJ
Company
Serv. Type
Work H(hn
Stand-by H(hr)
Count
Note
Code
Field Supenngodenl
1250
0
Drilling
ASRC
Clerk
12.50
1
Dtllling
ASRC
SOA
12.60
1
SID Support
ASRC
Crane Advisor
12.50
1
SID Support
Beacon
MI
12.50
1
SID Support
ACS
EnWmmental
12.50
2
SID Supped
ASRC
Company Man
12.50
2
Drilling
Sandal
HSE
1250
2
SID Support
Doyon
Toa pushers
12.50
2
Drilling
Lesion
HSE
12:5D
2
Dogthg
Holdiuron
Mutl Ld CPra
12.50
2
Drilling
Ml Sworn
Mud Engine.
12.50
2
Drilling
Northern Otlfailtl Serncea
Fueled
1250
2
SID Support
Voted(SHGE)
wean ed
12.50
2
Drilling
SLB
Cement
12.60
2
Drilling
GSR
Casing
12.50
3
Drilling
Comparison
LOgrsbe
12.50
4
SID Supped
Baker CeMriltit
ESP
1250
5
Drilling
MI Swaco
Mutl Plant
1250
6
Dknng
Procell
Security
12.50
6
SID Support
Ml Swaco
WIF
1250
8
SID Support
ESS
Catering12.50
12
SID Supped
Worley
Truck driver/ Crane operator
1250
14
Drilling
Doyon
RD Personnel
1260
28
DJIIIng_Total Drilling Personnel
BOP Stack & Components
Description
Stan Dew
Last Cerditication Date Pressure RzUrrg(01)
TypeMake
Model
ID Nom (In)
PRange (pap Last Cert Dale
Slow Circulation Rates
Pump Number: make
Moclick
Start Date End Date
Liner Size Un)
volume Per Stroke Overritle gbbllsOp Max Pressure grail
Data Depth thya)
Slow Sod
Stokes(spm)
P(psl)
EN(h) aFIow I'm)
Daily Bulk
Supply Item reaction., Equipment Fuel
Unit Labor Gei
Unit Size: 1
Note:
Date Consumetl Received
Returned Cum Concurred
Cum Recorded
Cam Returned Cum On Loc Node
8/52019 4570 4620
4,150.0
4.150.8
00
0.0
Supply Item Description: Mud MaW Boilers
'm Lobel:
Oal
Unit Size:
Node:
Dale Consumetl Received
Returnetl
Cum Consumetl
Cum insured
Cum Returned lCuIn Loc Nofe
8152019 1950 198.0
1.1880
1,180000
8.0
Supplyltem Desorlptipe: RMFunl
Unl[Label:
gel ua
Unit Size:1
Note:
Date Consumetl Received
Returned
Cum Consumed
Cum ReceivedCom
On Loc Note
ReturEOnLoc
8/5!2019 93]0 3,646.0
5,629.0
18,1160
00T0SupplyllemDescNptlWRg
ware,
Una Label:
bbl
Unit Size:1
Consumed Received
Returned Cum Demancetl
Cum Rocned
Cum Return Loc Nofe8/52019
tB,o00
1720
2700
00Supply
Rem Description: WIF 3.4
Unit Label: Gal
Unit Size:
Cum Consumetl
Cum Recelvetl
Cum l4ourn Loc
Nofe252000Supply
Item Descfiptipn: tuff mledil
Diesel
UNt Label:
Gal
Unit Size:
DateConsuetl
Receivetl
Returnetl
CumConsume
Cum Rece etl
Cum Retun Loc
Note8152019d0
00
00
p000
Last Authority Visit
Data T, Irnap. Nbr Total I.N.L. number Comment
STOP Cards Submitted
Company
# Finds
Co.
Dayan Dnlling
s
Doyon Drilling Inc.
6
COW
Doyon Dolling Inc.
6
HRWS
Doyon Drilling Inc.
20
IpjSM5
Safe Cards
MI swan
6
RIR'a
Ml Swaco
9
HARCIJSA
General Notes
Comment:
Well NameOR
:
Wellbore Name: e: SP24 SP24-SESE1
Well Code: 27974
Job: WORKOVER
2nWCEILevel: 3
Daily Report
Date: 6/612019
Report #: 7
Page: 1 of 2
Wel/ Header
PenntoconcesslonN` Operator
SubsidiaryIniflel LaM1ee Cotle
88583
ADL-388583IPETROLEUM
ENI Petrclaum Co. Im
Rotary Table Clever.. (ft Ground Level ltt)
Firs[Flange (k) RKB-Base Flange(@) RKB - Tubing about(it)
5393 0.00
1].18 36.]5 3184
Rigs
RIg Name COlrtredbr
T um f]22y0n019oam Rlg Release Dete
RIG 15 WYON
ANDYRIG .0]23
Daily information
Weamer Temparature PR
-
Wind Days Ln(day.) Days R! (days) POB
Cloudy 375
LT' 55500 1030
NE @ 9 MPH
Safety incidents -Near Miss
Date Category Type
Subtype Severity Lase Lost time?
Comment
Safety Dril/s
Days Until Next Check
TYPO
IfOccur
Last Date
Next Date
(do")
Areumulatpr Or,
1W1712049
it
AuWomy Visit
18102019
11N2019
90
BOP Pressure Test
1
822019
BIngong
Camp File Dntl
1$/12019
10402019
85
Fire Drill
1
8221119
81182019
10
Rig Fee our
1
Rest
111412019
90
Rg Inspection
7
&62019
8912019
1
Safery M.etllg
7
8(&12019
WM19
t
SPA Dda
1
8(82019
WWO19
13
1T Camp Evacuated, DMI
4
71312019
10292019
84
TT H2S 0.11
1
X52019
111312019
89
IT pck While Tnpmng CIA
i
&'}¢019
8152019
1
TT Man Down Dtl0
1
81;32019
ilmmi9
90
Casings seat
Cas. Type
OD PoJ
I to (in)
Brad.
Top (LIKE)
Bottom (RKB)
I Trip Bot(RKB)
Lending Date
LASING
20
1825
X45
OD
160,
160.0
224/2014
GSING
139/8
12.42
100
00 2,9000
2649.5
312.2014
CASING
9518
884
L.80
41
6237.0
3,9199
X82014
LINER
512
483
L-80
5934.1
1$.2360
4.022.0
31I&2014
Last Cementing
Cementing
Start Data: WW2014
sMOH: CivSING.5237 MIK
Comment:
Sig Is
Top (RKB)
Top Mee. Meth
Dim (fIK61
Co.
1
21 150 0
Sonic
d, 3] 0
PT linea 1000/ 3500 psi. Pump 110 bbls 10.5 ppg Mud Push @ 5 bpm, 220 psi, Bim Plug, 85 bbls of 12.5 ppg Lead
cml @ 4.3 bpm, tiD psi, 50 bots of 15.8 ppg Tail con @ 4.3 bpm, 150 psi, Top Plug, 10 obis FW, 378.7Ibis of 9.2
ppg LSNO mutl @ 0- 2 bpm, 520 psi, Bumped Plug and pressure up to 1020 psi for 5 min. Floats held CIP @ 0417
2
4,73]D
5,263.0
Job In/ormafion
Job Phase Plarmed Shaft Date
Start Date End Data PSO Duration Player
WORKOVER 7131201900:00
7(3120190040 0.00
Daily Summary operations
24h Forecast
Fourth pos.pod tree faxing. Fmeh sturang pits. Prepare and Level gravel kr SP03. Move out buildle, Rig down ed...nnecti, and phep for be move
2M Summery
Continue to mn In hole w14 F compte0on F13354' T/4779'. Make up hanger,
make penetrator sphei, best cable and Cap tuba,Land completion In profilelest banger seals. Rig down Baker AL and GER eq.,
Nipple down HOPE. Nipple W Ree and shad PossDod testing
Operation at 07.00
Laying hg mats M Repamikns for rig move.
Time Log
Start
End
Cum Dur
Time
Time
Dur(hr)
in,)
Phase
Our
I Act
Plan
Oper. Dees.
0000
0500
5 00
500
W O
K
4
P
Continue to run in hole with 4 V' ESP completion F/3354T14779' usmg CRT to tom.. tum We make up. hest condn0ay every
1000', add 5bph 9A ppg bine W well
0500
09.30
4.
950
O
K
20
P
hwiall XO pup IMMa in Wn Rl down CRT. Milk u . make di
9 g pi p up lending Make
upperpetrator and cap tildedpfinestoLonger asp perrocedu a brdA Lg,wQspafw test
wp Wba beating as pet procedure, burst diskw13800 psi, test clerk
Valve function unable fubuildpsecbe. valve stuck open
tuck op
9. 0
1039
1.00
10.50
W.O
d
P
Lend @ 4 61t' PD We =98k, RILOS. Leat upper and lower s6ela W Sk flID moi each -tests good.
efin.1
conduct Ona(dinnlln.iry teat ov ESP
ESP U ba-
a! teal goad.
10:30
18:30
B 00
18.
0.
C
5
P
line
Ley down binding Wino remove cap lino and ESP cable tramsM1eaves beck to spook[ I0H down babe exbenaipns. RD
down ROPE
eheaasantl UPPI.prep
18:30
00
55
24.00
W.
C
P
Nipple up tree and test robe he .000 psi for mannas, good test. P
Gleannardi prep well head UP tiespack
antl install TW C valve. X-Mes and
peck X -tree end Imes. Rlg up and start passport tes0lq Shell las! tree 500 psi low for 6 mumtes,
to
3.000 Per for 30 minutes, gdptl test.
, go
m
Pupetl int. AmiA last 24 hours of 9bh. 0 ppg bili bMax gas 24 hours=D unix.
Gas Readings
Avg Background Gas (v.)
Max Background Gas PA)
Avg Connection Gas (%)
Max Connection Gas (%)
Avg Drill Gas (%)
Max Drill Gas(%)
Avg Trip Gas (%)
Max Trip Gas �A)
Daily Mud Volumes
TmkMMcht Mdjwa
Type
De.
Volume @b0
Hole
]6.0
Loss
0.0
Tank
a9
Cumulative Mud Volumes
Justice Vq . (b&) Hole VOW.bbg AddlUoes
rifli Cum Adddipns b ossa atilt Gum Leasco (bbl)
3780 3760 00
00 600 16300
Daily Contacts
Ppaition contact Name Company
True Small ORlce
MobOe
Em reprnentetrve knuse-ususin ni
Drilling Supv, sidtlrilling@eni.com 907-605-0715
Well Name: SP24-SEI OR
Wellbore Name: SP24-SE1
Well Code: 27974
Job: WORKOVER
WCEI Level: 3
Daily Report
Date: 0/6/2019
Report #: 7
Page: 2 of 2
Daily Contacts
Pearson
Contact Name
Company
The
Email
Office
Mobile
Ere romeaenlative
Mika Grubb
Dnimg Supv.
achintag@mImm
907-685-0715
Em numesenlell
Marco Guarino
Eni
Drilling Supv.
685-0715
rsprezemalivn
Much BNmgmn
EN
Rig Clerk
AKRigClerksDoyonl5@eni.com
907$850722
Em re seserreay.
Cray Houghton
Em ,
HSE
Enr repseentatne
Mark Hotekr
Em
HSE
Toot Push
Justin Hays
Dayton Onling,
Tool Pusher
rigl5@doWndHllin9com
Toni Push
Too Kroger
Doyon D019ng
Tour Pusher
rig15@doyondAl min
90]-6050]18
Tool Push
Hamm Richardson
Doyon Drilling
USE
hrichardson@doWndrilling.com
685-0706
Tom Push
Seen Simmons
Doyon Dish,
HSE
Personnel Log (POB)
Company
Sero. Type
Work H(hr)
Standby H@t)
Count
Note
Doyon
Food Supermtentlent
12.50
0
Unions,
OCR
Casing
12.50
0
Drilling
ASRC
Clerk
12.60
1
Drilling
ASRC
SOA
12.50
1
SIO Support
AMC
Cmne Ativlsor
12.50
1
SID Support
Beacon
Medic
125D
i
SID Support
Northam Ofdestl Services
Feeler
1250
1
SID Support
Em
Company Man
1250
1
Drilling
KW
ERD
1250
1
Drilling
ACS
Enerrememal
12.50
2
SIO Support
ASRC
Company Man
12,50
2
Gillian
Season
USE
12.50
2
SID Support
Doyon
Tool pushers
1250
2
grilling
Doyon
HSE
12.50
2
Drilling
Halliburton
Mud Lopons
12.50
2
Dalian
MI 6".
Mud mi'm ar
1250
2
Onliing
Vetm Sol
Wall
12.50
2
Drilling
S1.5
German
1250
2
DAling
Baker Centellff
ESP
1250
2
Doffing
Demeanor.
Lcuse.
12,50
4
SIO Support
Ml Swem
Mud Plant
12.50
6
grilling
Purnell
Security
1250
6.
SIU Support
Ml tooter,
WIF
1250
0
SID Support
ESS
Carl
1250
12
SID Support
Worley
Truck driver l Crena operator
12.50
14
Drilling
Rig Perspmiel
1&50
26
Dnlline_Toml Drilling Personnel
BOP Stack & Components
Desedpoker
sun gate
Last Certification Date Pressure Fori(psi,
Type Make Motlel
ID Nom (ii
PRange opal) Lest Cert Dam
Slow Circulation Rates
Pump Number: Make:
Model:
Start Data End Data
Liner Sizelirt)
Vomme Per Stroke Override(bbllstk) Max Pressure(poll
Date Depth III
Slow Sod
Strokes labor)
P(pst)
Eff I%) QFlow (gpml
Daily Bulk
Supply lmm Description: Equirment Feet
Dust Label: Gel
Unit size: i
Note:
Date Consumetl Received
Returned Cum Consumed Cum Received
Cum Returnetl Cum On Loc
Note
85/2019 ]680
48r90
4,9180
00
0.0
Supply Item Desctbdon: Motional
Umt Label Gel
Unit Size:
Note:
Da[a Receivetl
Returned Lum Consumetl Cum Received
Cum
Returned Cum On Lou
Note
IConsumetl
8/62019 198.0 198.0
13860
1,386.0
00
0.0
Supply Gem Description: Rom Fuel
Unit Label:
all us
Unit Size: 1
Note:
Data Consumetl Increment
Returned
m Consumetl Cu
Cum ReceWetl
Bum
Returned Cum On Loc
Note
&&2019 also led
6.4950
116,1160
Do
910
Supply Item Description: Rig Wales
Unit Label:
bbl
Unit Size:I
Note:
Date Consumed Received
Returned
Cum Consumed Cum Recelved
Cum Returned Cum On
Note
H52019 4s0 0.0
221.0
2]0.0
00
490
supply gem Descriptio n: WIF Elders
Unit IJ
(gal
Unit Size:
Note:
Gate Consumetl Receivetl
Returned
X. Cpneumetl Cum Recelved
Cum
Returnetl Bum On Loc
Note
0512019 azo azo
2940
2990
0.0
0.0
supply Item Dewripdon: Wff e[[id
Diesel
Unit Lebec
Gal
Unit size:
Note:
Date Consumetl
Receivetl
Returnetl Curb Lonaptnetl Cum Recelved
CUM Returned Cum On Loa
Note
&612019 00
0.0
0C
0.0
0
00
Last Authority Visit
Data Tot ipap. Nor Total
I.N.L. number Comment
SRI
Vatfrom GSHA
STOP Cards Submitted
Company
4 Rots
Cam
Doyon Unions
a
PJSMS
Doyon Dalian Inc.
23
Safe Cams
Doyon Drilling Inc.
B
HRWS
Dayan Drilling Inc.
0
cow
MI Swam
8
RIR's
Ml 5wam
7
HARC/JSA
General Notes
Comment.
WELL LOG TRANSMITTAL
To: Alaska Oil and Gas Conservation Comm.
Atm.: Natural Resource Technician
333 West 7th Avenue, Suite 100
Anchorage, Alaska 99501
RE: Leak Detect and Multi Finger Caliper Records: SP24-SEI
Run Date: 7/7/2019
2 140 11
31122
August 2, 2019
The technical data listed below is being submitted herewith. Please address any problems or
concerns to the attention of:
Fanny Sari, Halliburton Wireline & Perforating, 6900 Arctic Blvd., Anchorage, AK 99518
SP24-SE1
Digital Data in LAS format, Digital Log File
50-629-23510-00
RECEIVED
AUG 2 7 2019
AOGCC
1 CD Rom
PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING A COPY OF THE
TRANSMITTAL LETTER TO THE ATTENTION OF:
Halliburton
Wireline & Perforating
Attn: Fanny Sari
6900 Arctic Blvd.
Anchorage, Alaska 99518
Office: 907-275-2605
FRS_ ANC@halliburton.com and Amjad.Chaudhry@eni.corr
Date: h-jop Signed:
THE STATE
°fALASKA
GOVERNOR MIKE DUNLEAVY
Stefano Pierfelici
Well Operations Project Manager
Eni US Operating Co. Inc.
3800 Centerpoint Drive, Suite 1400
Anchorage, AK 99503
Re: Nikaitchuq Field, Schrader Bluff Oil Pool, SP24-SEI
Permit to Drill Number: 214-011
Sundry Number: 319-340
Dear Mr. Pierfelici:
. Alaska Oil and Gas
Conservation Commission
333 West Seventh Avenue
Anchorage, Alaska 99501-3572
Main: 907.279.1433
Fax: 907.276.7542
w .aogcc.alasko.gov
Enclosed is the approved application for the sundry approval relating to the above referenced well.
Please note the conditions of approval set out in the enclosed form.
As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further
time as the AOGCC grants for good cause shown, a person affected by it may file with the AOGCC
an application for reconsideration. A request for reconsideration is considered timely if it is
received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if
the 23rd day falls on a holiday or weekend.
Sincerely,
J sie .Ihmielowski
Commissioner
DATED this 23 day of July, 2019.
RBDMS "'''AUL 2 4 2019
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
APPLICATION FOR SUNDRY APPROVALS
20 AAC 25.280
JUL 18 m
0,73-57- 123 (�
1. Type of Request: Abandon ❑ Plug Perforations ❑ Fracture Stimulate ❑ Repair Well ❑ Operations shutdown ❑
Suspend ❑ Perforate ❑ Other Stimulate ❑ Pull Tubing Q Change Approved Program ❑
Plug for Redrill ❑ Perforate New Pool ❑ Re-enter Susp Well ❑ Alter Casing ❑ ESP change OC
2. Operator Name:
4. Current Well Class:
5. Permit to Drill Number:
ENI US Operating Co. Inc.
Exploratory ❑ Development -
Stratigraphic ❑ Service ❑
214-011
3. Address:
6. API Number:
3800 Centerpoint Drive Suite 300, Anchorage 99503
50-62923510-00-00 '
7. If perforating:
8. Well Name and Number:
What Regulation or Conservation Order governs well spacing in this pool? n/a
SP24-SE1
Will planned perforations require a spacing exception? Yes ❑ No ❑�
9. Property Designation (Lease Number):
10. Field/Pool(s):
ADL 0391288, 0388583,0390616, 0390615
Nikaitchu Schrquder Bluff Oil
It. PRESENT WELL CONDITION SUMMARY
Total Depth MD (ft): Total Depth TVD (ft): Effective Depth MD: Effective Depth TVD: MPSP (psi): Plugs (MD): Junk (MD):
15,240 - 4,015 • 15,236 4,015 1059 We n/a
Casing Length Size MD TVD Burst Collapse
Structural
Conductor 160 20 160 160
Surface 2,900 13.375 2,900 2449 5,210 2,480
Intermediate 5,237 9.625 5,237 3,917 6,890 4,790
Production
Liner 110,1021 6.51 15,2361 4,0151 slotted slotted
Perforation Depth MD (ft):
Perforation Depth TVD (ft):
Tubing Size:
Tubing Grade:
Tubing MD (ft):
5237-15236
3,916-4,015
4.5"
L80
4,674
Packers and SSSV Type:
Packers and SSSV MD (ft) and TVD (ft):
N/A
N/A
12. Attachments: Proposal Summary : Wellbore schematic
13. Well Class after proposed work:
Detailed Operations Program BOP Sketch ❑�
Exploratory ❑ Stratigraphic ❑ Development ❑� Service ❑
14. Estimated Date for
15. Well Status after proposed work:
Commencing Operations: 21 -Jul -19
OIL ❑Z WINJ ❑ WDSPL ❑ Suspended ❑
GAS ❑ WAG ❑ GSTOR ❑ SPLUG ❑
16. Verbal Approval:` / Date:
Commission Representa we:
GINJ ❑ Op Shutdown ❑ Abandoned ❑
17. 1 hereby certify that the foregoing is true and the procedure approved herein will not
be deviated from without prior written approval.
Authorized Name: Stefano Pierfelici Contact Name: Amjad Chaudhry
Authorized Title: Well Operation project mana er Contact Email: am ad.chaudh enixon1
Contact Phone: 907-865-3379
Authorized Signature: "0 V \\ Dale: 7/17/2019
COMMISSION USE ONLY
Conditions of approval: Notify Commission so that a representative may witness Sundry Number:
l�
Plug Integrity ❑ Test Mechanical Integrity Test E] Location Clearance ❑
�BOOP
Other: ( 1f1 �F7a/'ET6- T / O .7ESCg� 05',
J
RBDMS ft,'JUL 2 4 2019
Post Initial Injection MIT Req'd? Yes ❑ No ❑
Spacing Exception Required? Yes ❑ No Subsequent Form Required:
•- APPROVED BY
COMMISSIONER THE COMMISSION Date:
Approved by:
PP PP-1a�_�"�`�",`1r"'v'Lapproval.M�T���Submil Fo
and
Form
Form 1 -403 Revised 4/2017 Approved a licati a date of Attachments in Duplicate
2n�
Cin�ii Pearolleu nn
3800 Centerpoint Drive Suite 300
Anchorage, Alaska 99503
Stefano Pierfelici
Phone (907) 865-3320
Email: Stefano.pierfelici@eni.com
July 181", 2019
Alaska Oil and Gas Conservation Commission
333 West 7" Avenue, Suite 100
Anchorage, Alaska 99501
RE: Application for Sundry Approval for SP24-SE1 Rig Workover
Dear Commissioners,
ENI US Operating Co. Inc. hereby applies for a Workover Sundry for well SP24-SEL
SP24-SEI was recompleted on Spy Island on April 3rd, 2014 with a TTC electric submersible
pump set at a depth of 4,779' MD. This ESP producer was completed without a packer.
The well was started up for production in April 2014.
Well is down since June 28, 2019 because of a suspected tubing leak.
The estimated date for beginning this work is July 2151, 2019.
Please find attached for the review of the Commission forms 10-403 and supporting
documentation.
If you have any questions or require further information, please contact Amjad Chaudhry at 907-
865-3379.
Sincerely,
Stefano Pierfelici
Well Operations Project Manager
SP24-SE1 Workover —Summary Page
PTD#:214-011
Current Status
Well SP24-SEI is currently shut down due to suspected tubing leak.
Scope of Work
Scope of this workover is pull out existing tubing and run new tubing and new ESP.
General Well info
Reservoir Pressure/TVD: This well is expected to have a static max bottom
hole pressure of approximately 1500 psi (4,015'
TVD) during the time of workover.
Wellhead type/pressure rating: Vetco Gray, MB -247/5000 psi
BOP configuration: Annular/pipe/shear rams/Pipe
TIFL/MIT-IA/MIT-OA: Due to the completion design these tests were not
performed. Intermediate csg 9 5/8" was tested prior
to drill out on March l 11h, 2014.
Well type:
Estimated start date:
Drilling rig:
Senior Drilling Engineer
Well Operations project Manager
Producer
July 215`, 2019
Doyon Rig 15
Amjad Chaudhry
Amlad.chaudhry(oienl.com
Work: 907-865-3379
Stefano Pierfelici
Stefano. oierfeliciaeni.com
Work: 907-865-3320
Procedure:
1. RU slick line and pull out shear valve from the GLM @ 2282'and replace it with
dummy valve .Pump in bull heading 9.0 ppg NaCl brine through tree. Pump in
bull heading 9.0 ppg NaCl in IA. Ensure well is killed. Set BPV.
2. MIRU Doyon Rig 15.
3. ND tree and NU BOP and test.
4. Remove BPV and Pull tubing to upper GLM.
5. Shear lower GLM valve and pump in bullheading 9.0 ppg KCl brine.
6. Pull tubing to lower GLM. Rig up slickline and pull tubing stop check valve.
7. POOH and lay down ESP assembly.
8. MU new ESP assembly on new tubing and RIH to setting depth.
9. Land hanger, and test it.
10. Install BPV and nipple down BOP.
11. NU tubing adapter and tree.
12. Pull BPV, install test plug and test tree.
13. Circulate Freeze protect through tree down IA.
14. Shut in well.
15. RDMO.
Below the current schematic of the well:
12.6 ppl Production Tubing
)iml
2,282'MD, 1.948'TVD 43°Inc -GLM, KBMG, 4-M'x 1". with
erg �➢?[r±'fi'�Cdrlil
2,000 psi STS -1 SOV installed
e
4-h" x-cplg cable clamps. for ESP
SP24-SEI
Power Cable, (1)3/8"Chem injLine
Dual Lateral Producer
4.574' MD, 3,711' TVD 66> Inc- GLM. KBMG, 446" x 1", with
with ESP Lift
3.100 psi STS -1 SOV installed
As completed
4,874' MD. 3,749' TVD - Discharge Gauge Sub
410 312 01 4
4,779' MD. 3,784' TVD, 810 Inc - Bottom of Motor Centralizer
Centrilitt. TTC-ESP, 134 -stage 38OP18SXD+ 25 -stage G42 pump, 513 GSB3 seals. 210 HP
MSP250 motor
Surf. Casin
4422' MD 23a Shroud Assembly with cable and chemical
13-318"1 68 a
injection line feed-mrus. and 3.5" perforated gas dispersion tuba Slotted Liner,
2,900' MD, 2,449'
5,081-5,98' MD, HAL S Oil Swell
5-X" Silver Bullet Ecc, 5.%" 15.5
P01
ND
Planned Casing Exit Packer
a
Nose Gent Shoe vim 75,210' NO, 4,010'
30° Inc.
Window
/
Sent Joint TVD
4,865' MD, 3,812'
89° Inc.
TVD -Ll - Baker
i
SLXP Liner
Hangedloacker
�
� 9
I: en
lose
5-% Silver Bullet Ecc
Nose Guide Shoe
�q 0.tp
5,134' MD,
-
3,691' TVD -
- -
Baker SLXP Interim. Casing R r
=- _ --
-- -
Liner Hanger) 9-518", 40a 1
Slotted Liner,
- _
Packer 5,237' MD, 3,916' TVD HAL 5-X" Oil Swell
VA" 15.5 ppf
79° Inc. Packer
15,236' MO, 4,015' TVD
fir Inc.
rvae1ahu9 r.eid -spr island
V E°tco G ray MB -247
SURFACE COMPLETION SYSTEM
PRP 10161, NC
0
Gc imacination a: work
10 OF 10 23 JANUARY 2009
HYDRIL 13-5/8" ANNULAR
"GK" 5000 PSI
STUD x FLANGE BX -160
RIG 15 BOP STACK
HYD�HI�L
HYDRIL MPL SINGLE GATE
13-5/8" 5000 PSI
FLANGE x FLANGE BX -160
10" OPERATORS
VARIABLE PIPE RAMS ® ®0 0
0 � 0.
HYDRIL MPL SINGLE GATE
13-5/8" 5000 PSI
FLANGE x STUD BX -160 rom
14" OPERATORS
BLIND/SHEAR RAMS
HYDRIL MPL SINGLE GATE 0 0'
13-5/8" 5000 PSI 0 0 0
FLANGE x FLANGE BX -160
10" OPERATORS
VARIABLE PIPE RAMS
u
• •
i 2
+.
"m
0 Er o:1o o 0 r..t m
y 7 M
iteti
U.
C.,.1nN OmMmQ1, 03 N n N n CO NO CO a M O O 1O 0 4.0
< H CO a N N N M M
a N N CO a N a M yap,
y
C7
. LU
5,-
11EC
ailo
N
Od
0 N C) N n N 0 CO N Uco
JoNNN CI0NC) ID
O Ommm rN 0 0) O R CO COC) CO m N CO UCO V ( N N 0 N M 0 N M M CO (.0 a CO a sOa
q"a 3
m W 0 co 0) 0) N C) co m m r O) n n CO m C) n n n m m n O) 0) 1...
y Q
4 N .- N 4-
0 0
m
E Z C C
m W O
N Sr a 0 N
d
VN co co M 0 co co .- mN N Op) CO 0 {0 00 CO g 0) 0. N O W «- n, CO O CO m
O 0 M a M 0 A a u`S N O 2 cpn N N N 2 m m a )` M " M N Q V
'I 2z 7 z �' a m
0
m
CO LLfi
O
N 0NTnWON hNMO CO 0- 0nm '0OmEN0EF- r n n N 100 CO n 0) CO m 1. N mn E U)C
O• F- 0
`m
oZ O a
O ZW W C s a N N N NN N N N N N 0 COc.., M 0 N N n r M N N N N N wY „ c .c ' )
rcQ Jgw N
JQ
y
a
mU N 13_
mo {-LL Z J U 0 N 0 O 0) to N co a a 0 0) 0 ON O MMam O NnOmMM CW
OW 0) 0) O 0) O OO)Q O 0 co co co < O co co N U) U) co co sr +C co VC"NNNNNNNNNNNNNNNNNN _3 OF— N a)
WI— J N H
N V = (0 l0
T Q
0 I— y 0 M O n N N 1+ 0 0 a n a n co O O co 0) 1n tO M m M 0 n n 13
Z Z d N 0 CO 0) m 0) ^ 0) N co T m O m C a co co co a M 0 U) a N N a n ' t
< Q a V /'1 N l7 N N NN 0 N N N NISI m
J2 o
O N
2
a CI 2
M n m 0) N n CO m n CO N 0 n CO
CO N U) N N N M N N m m O N 1n a O m m N 0 WI m 10Isn .Op p C) C
_Q] �- CO N N CO N M N N N N N N N N N N N M C
O
Q N
m ft's
OC
` N N co co m CO m CO CO CO CO m CO CO CO mmm N Ti,mV a aNNNNNN NNNNMNNNa N N N NNN N ) N
NO
iU d° m
o ' m ga
LL' 2 Y
W V -.5.
0 U) 0 0 CO 0 0 0 0 to 0 co 0 0 0 UJ 10 0 U) U) U) 0 0 0 0 0 0 0 0 0 m E
'O E
W Y $-
1T Z `o
N
d G C
)W m m m U) m m f0 CO m co co m U) m m U) m m m m b d) CO CD m (0 m CO CD y C
`o A oi 6 6 6 4 6 c+'i 6 6 o) m o ' 6 6 n' 6 _m N 6 4- A ' d u5 u5 g m 0 U)
a
O U�
gg 114) \,Q
d
0 60 60 60 60 3 0 c1 0 4 4 p 4 pq . g g g g g g g g p 0q g o o s c'
o q $ d 0,+, ,{ _
0 o 0 0 0 0 g o 0 0 $ 0 4 o m 4 o g o 4 $ p $ c 2
o W 0) N ? oo d) N n cS o) N• r c88 m
z M a g Q) m O F Ino IO N A 0 0 Um) r C) CO o a N H
Ft- .� co chi cgi M t7i cAi co• co m 2 M c"'�) U e`J) Un c U) A 2 A 2 A A E
Q N N N N N N N N N N N N N N N N N N N N N N av N N N N N N N 0
N N N N N N N N N N N N N N N N N N N N N Cl N N N N N N N N ei
O O O O O Q O O m 'Fc!':
m m m m O m CO m U) m O
1 �{ 1 1 QO U) U) U) d 8 ; d ; ; o; d gi d Ci d i d d `w
N N 1v0 $ 0 Ivo Uvj 1OO 'q N 1f1 1d0 100 0 0 0 0 0 0 0 0 0 0 0
O U)
C .c 15
ID E m z E E
O Q E 0 0 n CO m0) 0. w
c Z a a a 0; u,)
in a s LO a a o Z w w z n CO w co n 3 z
O O O M O O Z 1„) u) e �n m U
E n- v c g o $ o o c5 d o r- co m s- 0 1, ? o c5 S DS z LL z 4 m 3 4.5 5 3 y e c rn
CO w 3 a a a a 0 0 a 0 aaaa a e a as a a a a a a cn. aaaa a ca0 ca L a
0 0 0 0 0 0 0 0 0 0 0 0 W CO CO W W W W W m co co co m w 0 co co co ¢ _
MEMORANDUM State of Alaska
Alaska Oil and Gas Conservation Commission
TO: Jim Regg �Cf� iZ ��u DATE: 5/10/14
P. I. Supervisor
FROM: Jeff Jones SUBJECT: No-Flow test
Petroleum Inspector Nikaitchuq SP24-SE1 -
PTD 2140110
ENI
Nikaitchuq Field
5/10/14: I traveled to ENT's Nikaitchuq Field well SP24-SE1 to witness a No-Flow ,
verification test.
Allen Varner was the ENI representative for the test today and we met and
discussed the test procedure. The well production was bled down to 0 psi prior to -
my arrival. The tubing and inner annulus were lined up through an Erdco Armor-
flo flow meter model 3461-03TO-B to an open top tank. The well production did
not exceed 150 SCFH gas and no oil was produced, passing the AOGCC criteria -
for No-Flow status.
Summary: I witnessed a successful No-Flow test on ENI's Nikaitchuq Field well
SP24-SE1.
Attachments: None
SCANNED WAY 0 5 2015
2014-0510 No-Flow NikaitchugSP24-SE1_jj.docx
Technical Report Title
Date
Client: Eni Petroleum
Field: Nikaitchuq
Rig: Doyon 15
Date: April 2, 2014
Surface Data Logging
End of Well Report
SP24-SE1
SP24-SE1 L1
TABLE OF CONTENTS
1. General Information
2. Daily Summary
3. Days vs. Depth
4. After Action Review
5. Formation Tops
6. Show Reports
7. Mud Record
8. Bit Record
9. Morning Reports
10. Survey Report
Digital Data to include:
Final Log Files
Final End of Well Report
Final LAS Exports
Halliburton Log Viewer
EMF Log Viewer
GENERAL WELL INFORMATION
Company: Eni Petroleum
Rig: Doyon 15
Well: SP24-SE1 & SP24-SE1 L1
Field: Nikaitchuq
Borough: North Slope Borough
State: Alaska
Country: United States
API Number: 50-629-23510-00-00 (SP24-SE1)
50-629-23510-60-00 (SP24-SE1 L1)
Sperry Job Number: AK-XX-0901144926
Job Start Date: 25 Feb 2014
Spud Date: 26 Feb 2014
Total Depth: 15240’ MD, 3580’ MD (SP24-SE1)
15225’ MD, 4019’ TVD (SP24-SE1 L1)
North Reference: True
Declination: 19.454°
Dip Angle: 81.052°
Total Field Strength: 57627.841 nT
Date Of Magnetic Data: 26 February 2014
Wellhead Coordinates N: North 70° 33’ 27.85”
Wellhead Coordinates W: West 149° 54’ 19.62 “
Drill Floor Elevation 53.93’
Ground Elevation: 13.10’
Permanent Datum: Mean Sea Level
SDL Engineers: A. Paul Kalenuik, Kori Jo Plowman, Jade Miller
SDL Sample Catchers: Julia Ruth, Jane Grundin, Gregory Dellner,
Christopher Ward
Company Geologist: Andrew Buchanan
Company Representatives: Mike Ross, Jack Keener
SSDS Unit Number: 110
DAILY SUMMARY
02/24/2014
Begin rig move operations and spot Sperry SDL unit. Mudloggers rig up unit and calibrate gas
equipment.
02/25/2014
Continue to rig up and set up new well.
02/26/2014
Clean out conductor. Pick up BHA #2. Drill ahead and survey every 15’ to 500’ MD to ensure
safety from anti-collision. Drill ahead to 842’ MD.
Gas: The max gas was 10 units at 753’ MD and the average gas was 4 units.
Geology: No samples collected during surface section.
02/27/2014
Continue to drill ahead in surface section from 842’ MD to 1695’ MD.
Gas: The max gas was 83 units at 1685’ MD and the average gas was 19 units.
Geology: No samples collected during surface section.
02/28/2014
Continue to drill ahead from 1695’ MD to TD at 2915’ MD. Encounter packing off and stuck pipe
from 2839’ MD to 2869’ MD.
Gas: The max gas was 378 units at 1944’ MD and the average gas was 103 units.
Geology: No samples collected during surface section.
03/01/2014
Trip out of hole and lay down BHA #2. Clean and clear rig floor. Rig up to run 13 3/8” casing.
Run casing to 1174’ MD.
Gas: The max trip gas was 724 units.
.
03/02/2014
Finish running casing to 2900’ MD. Cement casing. Nipple up BOPE
03/03/2014
Service rig and test BOPE. Rig down BOPE equipment, pull test plug, install wear ring per
Vetco Grey. Make up BHA #3.
03/04/2014
Continue to make up BHA #3. Run in the hole to 1600’ MD and shallow hole test. Run in the
hole to 2721’ MD and perform casing test at 2500 psi. Drill out float and 20’ of new hole.
Perform FIT to 12.77 ppg. Drill ahead form 2935’ MD to 3465’ MD.
Gas: The max gas was 35 units at 3079’ MD and the average gas was 15 units.
Geology: Samples consist mainly of Sandstone.
03/05/2014
Continue to drill ahead from 3465’ MD to 4554’ MD.
Gas: The max gas observed was 19 units at 4264’ MD and the average gas was 7 units.
Geology: Samples consist mainly of Sandstone.
03/06/2014
Continue to drill ahead from 4554’ MD to intermediate TD of 5263’ MD. Off bottom at 18:30 and
begin to back ream out of hole per K&M representative.
Gas: The max gas observed was 400 units at 4842’ MD and the average gas was 64 units.
Geology: Samples consist mainly of Sandstone with some Siltstone.
03/07/2014
Continue to back ream out of hole to 2900’ MD. Pull out of hole, lay down BHA #3 and clean rig
floor.
Gas: The max trip gas observed was 84 units.
Geology: No samples collected
03/08/2014
Rig up and rig down test equipment. Pull test plug and set wear ring. Run in hole with 9 5/8”
casing. Set casing at 5237’ MD. Lay down casing equipment. Rig up cement head and
circulating equipment. Circulate and condition mud.
Gas: The max gas observed while running casing was 61 units.
Geology: No samples collected
03/09/2014
Pumped cement and conducted injectivity test. Rig down cement equipment and cleaned rig
floor. Nipple down BOP stack, cut casing, and Nipple up BOP stack. Tested BOP and rig down
test equipment.
Gas: No gas due to pumps being off.
Geology: No samples collected
03/10/2014
Pulled test plug and set wear ring. Cleaned and cleared rig floor. Picked up 5” Drill Pipe and
rigged up test equipment. Tested 9-5/8” casing. Picked up BHA tools. Change out upper/lower
IBOPs and actuator shell. Test equipment and make up BHA #4.
Gas: No gas due to pumps being off.
Geology: No samples collected
03/10/2014
Pulled test plug and set wear ring. Cleaned and cleared rig floor. Picked up 5” Drill Pipe and
rigged up test equipment. Tested 9-5/8” casing. Picked up BHA tools. Change out upper/lower
IBOPs and actuator shell. Test equipment and make up BHA #4.
Gas: No gas due to pumps being off.
Geology: No samples collected
03/11/2014
Continue to pick up BHA #4. Run in hole with 5” drill pipe, perform shallow hole test, and log
CSG collars. Displace mud from LSND to OBM. Cut and slip drill line, service rig. Drill out
cement and 20’ of new hole. Perform LOT and FIT test. Drill ahead.
Gas: Maximum gas was 862 units at 6355’ MD and average gas was 435 units.
Geology: Samples consisted of sandstone.
03/12/2014
Continue to drill ahead from 6363’ MD to 8732’ MD.
Gas: Maximum gas was 1225 units at 7973’ MD and average gas was 576 units.
Geology: Samples consisted mostly of sandstone, some siltstone present.
03/13/2014
Continue to drill ahead from 8732’ MD to 11366’ MD.
Gas: Maximum gas was 1344 units at 10600’ MD and average gas was 644 units.
Geology: Samples consisted entirely of sandstone.
03/14/2014
Continue to drill ahead from 11366’ MD to 13718’ MD.
Gas: Maximum gas was 1555 units at 12048’ MD and average gas was 398 units.
Geology: Samples consisted mostly of sandstone, some siltstone present.
03/15/2014
Continue to drill ahead from 13718’ MD to 15240’ MD. Begin to back ream.
Gas: Maximum gas was 1526 units at 14851’ MD and average gas was 537 units.
Geology: Samples consisted mostly of sandstone, some siltstone present.
03/16/2014
Continue to back ream out of hole from 15170’ MD to 9168’ MD.
Gas: Maximum trip gas observed was 62 units.
03/17/2014
Continue to back ream out of hole from 9168’ MD to 5237’ MD.
Gas: Maximum trip gas was 18 units.
03/18/2014
Back ream out of hole and circulate bottoms up. Pull out of hole from 2539’ MD to 392’ MD and
lay down BHA #4. Clean and clear rig floor. Rig up to run liner, upload MWD tools, remove
from pipeshed, and stage liner jewelry in pipeshed. Run 5.5” liner to 7245’ MD.
Gas: Maximum trip gas was 12 units.
03/19/2014
Finish running liner and lay down liner tools. Rig up e-line, run in the hole and correlate for logs.
Gas: No gas due to pumps being off.
03/20/2014
Continue e-line logging. Rig down wire line. Pick up BHA #5 and run in the hole to the top of the
liner. Pull out of the hole and lay down BHA. Make up upper and lower mill assembly. Make up
whipstock BHA #6. Trip in the hole and establish milling rate. Orient and set whipstock. Mill
casing window.
Gas: Maximum trip gas was 6 units.
03/21/2014
Continue to mill 8.75” window in casing and 28’ of rathole to 5126’ MD. Rig up and perform
formation integrity test to 13.0 ppg. Pull out of hole and lay down BHA #6. Make up BHA #7 and
trip in hole. Drill from 5126’ MD to 5326’ MD. Begin to trip out of hole to pick up the production
BHA.
Gas: Maximum gas was 41 units at 5192’ MD and average gas was 22 units.
Geology: Samples consisted mostly of sandstone, some siltstone present.
03/22/2014
Continue to pull out of hole and lay down BHA #7. Rig up test equipment and test BOP’s. Rig
down BOP test equipment. Begin to make up BHA #8.
Gas: Maximum trip gas was 27 units.
03/23/2014
Continue to make up BHA #8. Run in the hole to 1500’ MD and perform a shallow hole test. Run
in the hole to 5060’ MD then slip and cut the drill line. Service the rig. Drill 8.75” production hole
from 5326’ MD to 6830’ MD.
Gas: Maximum gas was 1154 units at 6126’ MD and average gas was 635 units.
Geology: Samples consisted mostly of sandstone, some siltstone present.
03/24/2014
Continue to drill ahead from 6830’ MD to 9493’ MD.
Gas: Maximum gas was 1415 units at 7409’ MD and average gas was 804 units.
Geology: Samples consisted mostly of sandstone, some siltstone present.
03/25/2014
Continue to drill ahead from 9493’ MD to 12207’ MD.
Gas: Maximum gas was 2620 units at 11478’ MD and average gas was 1298 units.
Geology: Samples consisted of mostly sandstone with some siltstone.
03/26/2014
Continue to drill ahead from 12207’ MD to 13738’ MD.
Gas: Maximum gas was 2761 units at 12943’ MD and average gas was 1278 units.
Geology: Samples consisted of mostly sandstone with some siltstone.
03/27/2014
Continue to drill ahead from 13738’ MD to 15225’ MD.
Gas: Maximum gas was 2951 units at 13713’ MD and average gas was 1151 units.
Geology: Samples consisted of mostly sandstone.
03/28/2014
Back reaming out of hole.
Gas: Maximum Trip gas was 130u.
03/29/2014
Back reaming out of hole. Lay down BHA # 8 and pick up BHA # 9
03/30/2014
Drop rabbit. POH. L/D whipstock & retreival tool. C/O saver sub & inspect top drive. R/U Volant
tool. Run 5.5” liner to 962’.
03/31/2014
RIH 5.5" Liner. Liner went thru window no problems. RIH w/5" DP & tag bottom at 15225'. Shoe
at 15210'. Set at 4865’. Drop ball & shear f/packer. In the process of displacing to 9.2 lb/gal
Brine at 3 bpm.
0
1000
2000
3000
4000
5000
6000
7000
8000
9000
10000
11000
12000
13000
14000
15000
0 5 10 15 20 25 30 35 40 45
Me
a
s
u
r
e
d
D
e
p
t
h
Rig Days
Prognosed
Actual
WELL NAME: SP24-SE1 & SP24-SE1 L1
OPERATOR: Eni Petroleum
MUD CO: MI Swaco
RIG: Doyon 15
SPERRY JOB: AK-XX-0901144926
Days vs. Depth
20 February 2014
Sperry SDL remain on location
from previous well
LOCATION: Spy Island
AREA: Nikaitchuq
STATE: Alaska
SPUD: 26-Feb-2014
TD: 27-Mar-2014
Commenced 16.0" Surface Hole Section
On Bot: 01:03 26 Feb 2014
TD Surface Hole Section
2915' MD, 2462' TVD
Off Bot: 22:23 28 Feb 2014
Landed 13.38" Casing
2900' MD, 2450' TVD
02 Mar 2014
Commenced 12.25" Intermediate
Hole Section
On Bot: 15:00 04 Mar 2014
Landed 9.625" Casing
5237' MD, 3916' TVD
08 Mar 2014
TD Intermediate Hole Section
5263' MD, 3924' TVD
Off Bot: 18:25 06 Mar 2014
Commenced 8.75" Production
Hole Section
On Bot: 11:32 11 Mar 2014
TD Production Hole Section
15240' MD, 3580' TVD
Off Bot: 21:45 15 Mar 2014
Mill 8.75" hole to 5326' MD
POOH to test BOPs
and Change to Production BHA
21 Mar 2014
Commenced 8.75" Production
Hole Section L1
On Bot: 10:50 23 Mar 2014
TD Production Hole Section
15225' MD, 4019' TVD
Off Bot: 22:59 27 Mar 2014
WELL NAME:LOCATION:
OPERATOR:AREA:
SPERRY JOB:STATE:
RIG:Doyon 15 HOLE SECTION:Surface
EMPLOYEE NAME:DATE:
Sperry Drilling Confidential Document v 3.0
AK-XX-0901144926 Alaska
SP24-SE1 Spy Island
Eni Petroleum Nikaitchuq Field
Paul Kalenuik 28-Feb-2014
What went as, or better than, planned:
The gas gas gear ran as expected. Drilling commenced and continued without interuption to TD.
Difficulties experienced:
New computers were installed before the beginning of this new section. Some difficulties were
experienced mostly due to getting used to the new windows 7 operating system. Some things needed
to be configured from scratch as the config files were not saved from the previous computers.
Recommendations:
Make sure to save all configuration files to an external source.
Innovations and/or cost savings:
N/A
Surface Data Logging
After Action Review
Surface Data Logging
WELL NAME:LOCATION:
OPERATOR:AREA:
SPERRY JOB:STATE:
RIG:Doyon 15 HOLE SECTION:Intermediate
EMPLOYEE NAME:DATE:
Sperry Drilling Confidential Document v 3.0
Jade Miller 6-Mar-2014
What went as, or better than, planned:
Overall, gas equipment worked well and there was minimal data lost for the intermediate section.
Difficulties experienced:
WITS had to be remapped in order to receive gamma data from Schlumberger. The gas
chromatograph had to be re-started once during drilling but otherwise functioned properly.
Recommendations:
If possible, a trial run of WITS and all other functions should be performed before drilling begins. At
this time there is not a way test WITS configurations before we start receiving data from a 3rd party. If
there was a way to send psuedo data via WITS we could test configurations prior to the start of
drilling.
Innovations and/or cost savings:
N/A
AK-XX-0901144926 Alaska
SP24-SE1 Spy Island
Eni Petroleum Nikaitchuq Field
Surface Data Logging
After Action Review
Surface Data Logging
WELL NAME:LOCATION:
OPERATOR:AREA:
SPERRY JOB:STATE:
RIG:Doyon 15 HOLE SECTION:Production
EMPLOYEE NAME:DATE:
Sperry Drilling Confidential Document v 3.0
AK-XX-0901144926 Alaska
SP24-SE1 Spy Island
Eni Petroleum Nikaitchuq Field
Kori Jo Plowman 15-Mar-2014
What went as, or better than, planned:
During production drilling the gas equipment worked as it should.
Difficulties experienced:
While drilling, during most connections, Insite would either get stuck in slips or not go in at all. This
issue was attempted to be corrected by changing the hookload with no luck.The ECD is not being
WITSed to Canrig for reasons neither party has been able to figure out. This requires us to send an
override every few minutes. During drilling, the workstation shut down for an update. After the
workstation came back on, the settings were changed to ask before an automatic update. On several
occasions, all of the computers lost connection to the MADI computer. The MADI needs to be shut
down and restarted while the other computers need to close Insite, then reopen all applications, start
WITS, start 8900, and anything else that was open. During one of these connection losses when
WITS was restarted to send to Canrig it would not. The comport had changed to an incorrect setting
and needed to be changed back. Restarting computers, Insite, re-pointing traces, and updating all
descriptors was extremely time consuming while drilling.
Recommendations:
While drilling, during each connection watch the slips and adjust the depth accordingly before drilling
begins again. Have an actual IT person come out to location to address computer issues, such as
comports changing and computers lossing connection to the data base, issues that have not been
solved by phone communication.
Innovations and/or cost savings:
N/A
Surface Data Logging
After Action Review
Surface Data Logging
WELL NAME:SP24-SE1 & SP24-SE1 L1 LOCATION:Spy Island
OPERATOR:Eni Petroleum AREA:Nikaitchuq Field
MUD CO:MI Swaco STATE:Alaska
RIG:Doyon 15 SPUD:26-Feb-2014
SPERRY JOB:AK-XX-0901144926 TD:27-Mar-2014
Marker MD INC AZ TVD TVDSS
16" Surface Borehole
20" Conductor Shoe 160.0 0.7 279.2 160.0 -106.1
SV-4 774.0 18.0 293.5 766.3 -712.4
SV-3 1,172.0 33.1 299.0 1,122.3 -1,068.4
SV-2 1,492.0 41.0 297.7 1,374.2 -1,320.3
Permafrost Base 2,010.0 45.3 297.0 1,756.4 -1,702.5
SV-1 2,248.5 43.6 290.2 1,923.3 -1,869.4
Ugnu Top (UG4)2,652.0 34.2 268.4 2,239.6 -2,185.7
13 3/8" Casing Shoe 2,900.0 30.2 252.9 2,449.5 -2,395.5
TD 16" Borehole 2,915.0 29.9 251.8 2,462.4 -2,408.5
12 1/4" Intermediate Borehole
UG-2 Coal Bed Marker 3,232.0 25.3 222.4 2,743.2 -2,689.3
Lower Ugnu 4,048.0 47.3 163.1 3,422.0 -3,368.1
Schrader Bluff 4,520.0 64.2 145.0 3,687.8 -3,633.9
N Sequence Top 4,639.0 67.9 142.4 3,736.4 -3,682.4
N Sand Top 4,759.5 70.9 139.7 3,778.1 -3,724.1
N2 4,781.0 71.3 139.4 3,785.0 -3,731.1
N3 4,799.0 71.3 139.5 3,790.8 -3,736.9
N Sand Bottom 4,914.0 71.4 138.4 3,827.5 -3,773.6
N Sequence Base 5,088.0 74.6 132.9 3,879.4 -3,825.5
9 5/8" Int. Casing 5,248.0 78.4 132.1 3,918.6 -3,864.7
TD 12 1/4" Borehole 5,263.0 79.2 132.4 3,921.4 -3,867.4
8 3/4" Lateral Leg - SP24-SE1
OA-1 5,502.0 85.2 125.6 3,944.7 -3,890.8
OA-2 5,633.0 85.3 126.5 3,956.0 -3,902.1
OA-3 5,737.0 87.0 127.9 3,963.2 -3,909.2
OA-3 6,010.0 89.8 126.7 3,967.0 -3,913.1
OA-3 6,110.0 88.3 124.8 3,968.6 -3,914.7
OA-3 6,600.0 92.3 124.4 3,981.2 3,927.3
OA-2 6,690.0 92.4 122.5 3,977.5 -3,923.5
OA-1 6,780.0 92.0 121.8 3,973.9 -3,920.0
OA-1 7,015.0 96.9 123.7 3,976.7 -3,922.8
OA-2 7,710.0 90.5 129.7 3,986.7 -3,932.8
OA-3 7,930.0 87.1 128.5 3,989.2 -3,935.3
OA-3 9,432.0 92.0 125.3 4,009.0 -3,995.0
OA-2 9,500.0 92.1 124.9 4,004.4 -3,950.5
OA-1 9,920.0 88.7 125.1 4,006.3 -3,952.3
OA-1 10,152.0 86.4 126.7 4,016.0 -3,962.0
OA-2 10,390.0 87.8 128.1 4,027.3 -3,973.3
OA-3 10,495.0 88.7 129.0 4,030.7 -3,976.8
OA-4 10,955.0 88.1 126.5 4,042.6 -3,988.7
OA-4 11,190.0 91.5 126.0 4,041.5 -3,987.6
OA-3 12,575.0 92.1 125.9 4,023.5 -3,969.6
OA-2 12,750.0 92.1 125.7 4,016.0 -3,962.1
OA-2 13,430.0 90.7 124.6 4,011.1 -3,957.1
OA-2 13,665.0 92.1 124.6 4,005.2 -3,951.3
OA-1 13,800.0 91.9 125.6 3,999.9 -3,946.0
OA-1 13,985.0 88.0 125.9 4,000.1 -3,946.2
OA-2 14,230.0 87.6 126.8 4,005.7 -3,951.8
OA-3 14,375.0 88.3 126.7 4,011.9 -3,957.9
TD 8 3/4"15,240.0 92.0 126.0 4,016.2 -3,962.3
Formation Tops
WELL NAME:SP24-SE1 & SP24-SE1 L1 LOCATION:Spy Island
OPERATOR:Eni Petroleum AREA:Nikaitchuq Field
MUD CO:MI Swaco STATE:Alaska
RIG:Doyon 15 SPUD:26-Feb-2014
SPERRY JOB:AK-XX-0901144926 TD:27-Mar-2014
Marker MD INC AZ TVD TVDSS
8 3/4" Lateral Leg - SP24-SE1 L1
TOW 5,081.0 75.8 134.2 3,877.3 -3,823.3
BOW 5,098.0 76.0 133.0 3,881.4 -3,827.5
OA-1 5,511.0 85.7 116.0 3,944.8 -3,890.8
OA-2 6,719.0 87.7 125.5 3,983.0 -3,929.1
OA-3 6,818.0 87.5 126.3 3,986.9 -3,933.0
OA-4 7,706.0 88.9 126.3 4,008.6 -3,954.7
OA-4 7,866.0 91.9 125.9 4,006.0 -3,952.1
OA-3 8,177.0 92.7 124.9 3,992.3 -3,938.4
OA-2 8,296.0 90.4 124.4 3,989.7 -3,935.8
OA-2 9,438.0 86.6 126.4 4,009.1 -3,955.2
OA-3 9,521.0 86.8 126.5 4,014.0 -3,960.1
OA-3 10,433.0 92.0 127.6 4,034.0 -3,980.0
OA-3 10,602.0 89.9 126.3 4,030.1 -3,976.2
OA-3 10,848.0 92.2 126.3 4,028.1 -3,974.1
OA-2 10,949.0 93.0 126.8 4,023.3 -3,969.3
OA-2 12,361.0 88.1 124.1 4,015.3 -3,961.4
OA-3 12,484.0 88.3 124.2 4,019.8 -3,965.9
OA-3 14,691.0 92.0 124.1 4,007.2 -3,953.3
OA-2 14,882.0 91.0 123.4 4,005.6 -3,951.7
TD 8 3/4"15,225.0 89.3 121.0 4,009.5 -3,955.5
Formation Tops
Well Name:Depth (MD)to ft
Location:(TVD)to ft
Operator:
Report Prepared By:Formation:
Report Delivered To:Date:
Hydrocarbon Ratios
Depth ft Gas Units Mud Chlorides (mg/L) = C1 C1 C1 C1.
Flowline Background Show C2 C3 C4 C5
ppm ppm ppm
Hydrocarbon Ratios
C1 -=C1/C2 =
C2 -=C1/C3 =
C3 -=C1/C4 =
C4 -=C1/C5 =
C5 -=
Production
Analysis Gas Oil Water x Non-Producible Hydrocarbons
Depth ft Gas Units Mud Chlorides (mg/L) = .
Flowline Background Show
ppm ppm ppm
Hydrocarbon Ratios
C1 -=C1/C2 =
C2 -=C1/C3 =
C3 -=C1/C4 =
C4 -=C1/C5 =
C5 -=
Production
Analysis Gas Oil Water x Non-Producible Hydrocarbons
Hydrocarbon Ratios
Depth ft Gas Units Mud Chlorides (mg/L) = C1 C1 C1 C1.
Flowline Background Show C2 C3 C4 C5
ppm ppm ppm
Hydrocarbon Ratios
C1 -=C1/C2 =
C2 -=C1/C3 =
C3 =C1/C4 =
C4 -=C1/C5 =
C5 -=
Production
Analysis Gas Oil Water x Non-Producible Hydrocarbons
Depth ft Gas Units Mud Chlorides (mg/L) = .
Flowline Background Show
ppm ppm ppm
Hydrocarbon Ratios
C1 -=C1/C2 =
C2 -=C1/C3 =
C3 -=C1/C4 =
C4 -=C1/C5 =
C5 -=
Production
Analysis Gas Oil Water x Non-Producible Hydrocarbons
1
2
3
4
56 0 56
0 0
0 0
No producible oil within these zones based upon gas and chromatograph data collected.
0
3684863
12004759242
34 25
11
9
17044 1425
152614850
29 0 29
89 10 79
29
241 36 205
0
0 33
0 0
33
0
51608 5426 46182
30432
6000
241
0
104
-0
14 0 14
124 20
0 0
25091
1200
1792
-
212
1100
1471
1847
-
248
4841
54559 48559
229 19
400
0.00
0 11
0 29
15619
0 0
539
539
279
4198
-
198
Interpretation:
Show Report Report # 1
5100
3882
4700
3758
N Sands
17-Mar-2014
1100
225
SP24-SE1
Spy Island
ENI Petroluem
Jane Grundin
Andrew Buchanan
-
5341
1
10
100
1000
Oil
Gas
NPH
NPH
1
10
100
1000
NPH
Oil
Gas
NPH
Well Name:Depth (MD)to ft
Location:(TVD)to ft
Operator:
Report Prepared By:Formation:
Report Delivered To:Date:
Hydrocarbon Ratios
Depth ft Gas Units Mud Chlorides (mg/L) = C1 C1 C1 C1.
Flowline Background Show C2 C3 C4 C5
ppm ppm ppm
Hydrocarbon Ratios
C1 -=C1/C2 =
C2 -=C1/C3 =
C3 -=C1/C4 =
C4 -=C1/C5 =
C5 -=
Production
Analysis Gas Oil Water x Non-Producible Hydrocarbons
Depth ft Gas Units Mud Chlorides (mg/L) = .
Flowline Background Show
ppm ppm ppm
Hydrocarbon Ratios
C1 -=C1/C2 =
C2 -=C1/C3 =
C3 -=C1/C4 =
C4 -=C1/C5 =
C5 -=
Production
Analysis Gas Oil Water x Non-Producible Hydrocarbons
Hydrocarbon Ratios
Depth ft Gas Units Mud Chlorides (mg/L) = C1 C1 C1 C1.
Flowline Background Show C2 C3 C4 C5
ppm ppm ppm
Hydrocarbon Ratios
C1 -=C1/C2 =
C2 -=C1/C3 =
C3 =C1/C4 =
C4 -=C1/C5 =
C5 -=
Production
Analysis Gas Oil Water x Non-Producible Hydrocarbons
Depth ft Gas Units Mud Chlorides (mg/L) = .
Flowline Background Show
ppm ppm ppm
Hydrocarbon Ratios
C1 -=C1/C2 =
C2 -=C1/C3 =
C3 -=C1/C4 =
C4 -=C1/C5 =
C5 -=
Production
Analysis Gas Oil Water x Non-Producible Hydrocarbons
1
2
3
4
204 1 203
0 67
204 33
No producible oil within these zones based upon gas and chromatograph data collected.
171
11747433
15005546858
262 218
461
44
151528 8209
12237974
204 3 201
633 24 609
241
627 59 568
206
22 219
431 45
241
386
148978 6654 142324
111149
3030
303
67
366
1655216
153 0 153
366 0
216 0
110858
1800
725
513
245
1500
678
653
385
633
6535
151528 148498
605 28
963
0.00
65 396
8 233
143319
158 48
615
713
706
359
901
235
Interpretation:
Show Report Report # 2
8000
3852
5500
3944
OA-Sequence
17-Mar-2014
1800
251
SP24-SE1
Spy Island
ENI Petroluem
Jane Grundin
Andrew Buchanan
868
291
1
10
100
1000
Oil
Gas
NPH
NPH
1
10
100
1000
NPH
Oil
Gas
NPH
Well Name:Depth (MD)to ft
Location:(TVD)to ft
Operator:
Report Prepared By:Formation:
Report Delivered To:Date:
Hydrocarbon Ratios
Depth ft Gas Units Mud Chlorides (mg/L) = C1 C1 C1 C1.
Flowline Background Show C2 C3 C4 C5
ppm ppm ppm
Hydrocarbon Ratios
C1 -=C1/C2 =
C2 -=C1/C3 =
C3 -=C1/C4 =
C4 -=C1/C5 =
C5 -=
Production
Analysis Gas Oil Water x Non-Producible Hydrocarbons
Depth ft Gas Units Mud Chlorides (mg/L) = .
Flowline Background Show
ppm ppm ppm
Hydrocarbon Ratios
C1 -=C1/C2 =
C2 -=C1/C3 =
C3 -=C1/C4 =
C4 -=C1/C5 =
C5 -=
Production
Analysis Gas Oil Water x Non-Producible Hydrocarbons
Hydrocarbon Ratios
Depth ft Gas Units Mud Chlorides (mg/L) = C1 C1 C1 C1.
Flowline Background Show C2 C3 C4 C5
ppm ppm ppm
Hydrocarbon Ratios
C1 -=C1/C2 =
C2 -=C1/C3 =
C3 =C1/C4 =
C4 -=C1/C5 =
C5 -=
Production
Analysis Gas Oil Water x Non-Producible Hydrocarbons
Depth ft Gas Units Mud Chlorides (mg/L) = .
Flowline Background Show
ppm ppm ppm
Hydrocarbon Ratios
C1 -=C1/C2 =
C2 -=C1/C3 =
C3 -=C1/C4 =
C4 -=C1/C5 =
C5 -=
Production
Analysis Gas Oil Water x Non-Producible Hydrocarbons
17-Mar-2014
83500
288
SP24-SE1
Spy Island
ENI Petroluem
Jane Grundin
Andrew Buchanan
845
7199
Interpretation:
Show Report Report # 3
10300
3765
8200
3844
OA-Sequence
1050
3673
2153
423
936
299
0.00
65 347
36 119
124898
157 48
553
9379
147690 146979
553 0
1165
133806
82000
743
396
266
89000
724
874
393
226 46 180
591 74
399 61
153560 6654 146906
141005
711
259
191
517
892338
569 59 510
205
0 203
374 0
203
374
147 113 34
480 62 418
155
212 168
412
44
130924 6026
102310310
174 0
No producible oil within these zones based upon gas and chromatograph data collected.
174
12149700
8950082681133
1
2
3
4
147 89 58
41 150
1
10
100
1000
Oil
Gas
NPH
NPH
1
10
100
1000
NPH
Oil
Gas
NPH
Well Name:Depth (MD)to ft
Location:(TVD)to ft
Operator:
Report Prepared By:Formation:
Report Delivered To:Date:
Hydrocarbon Ratios
Depth ft Gas Units Mud Chlorides (mg/L) = C1 C1 C1 C1.
Flowline Background Show C2 C3 C4 C5
ppm ppm ppm
Hydrocarbon Ratios
C1 -=C1/C2 =
C2 -=C1/C3 =
C3 -=C1/C4 =
C4 -=C1/C5 =
C5 -=
Production
Analysis Gas Oil Water x Non-Producible Hydrocarbons
Depth ft Gas Units Mud Chlorides (mg/L) = .
Flowline Background Show
ppm ppm ppm
Hydrocarbon Ratios
C1 -=C1/C2 =
C2 -=C1/C3 =
C3 -=C1/C4 =
C4 -=C1/C5 =
C5 -=
Production
Analysis Gas Oil Water x Non-Producible Hydrocarbons
Hydrocarbon Ratios
Depth ft Gas Units Mud Chlorides (mg/L) = C1 C1 C1 C1.
Flowline Background Show C2 C3 C4 C5
ppm ppm ppm
Hydrocarbon Ratios
C1 -=C1/C2 =
C2 -=C1/C3 =
C3 =C1/C4 =
C4 -=C1/C5 =
C5 -=
Production
Analysis Gas Oil Water x Non-Producible Hydrocarbons
Depth ft Gas Units Mud Chlorides (mg/L) = .
Flowline Background Show
ppm ppm ppm
Hydrocarbon Ratios
C1 -=C1/C2 =
C2 -=C1/C3 =
C3 -=C1/C4 =
C4 -=C1/C5 =
C5 -=
Production
Analysis Gas Oil Water x Non-Producible Hydrocarbons
1
2
3
4
166 68 98
90 90
152 42
No producible oil within these zones based upon gas and chromatograph data collected.
110
139411824
89000106001323
183 140
361
43
189180 7098
154512271
354 91 263
621 56 565
185
594 89 505
169
24 133
301 73
157
228
173638 9908 163730
168328
5009
284
180
560
1766252
197 40 157
635 75
374 122
158916
79000
1012
631
303
81000
1138
1170
664
548
11547
156360 151351
500 48
1255
0.00
122 239
26 159
182082
87 82
1145
692
1858
685
1882
322
Interpretation:
Show Report Report # 4
12300
3690
10600
3754
OA-Sands
17-Mar-2014
81000
324
SP24-SE1
Spy Island
ENI Petroluem
Kori Jo Plowman
Andrew Buchanan
1376
9412
1
10
100
1000
Oil
Gas
NPH
NPH
1
10
100
1000
NPH
Oil
Gas
NPH
Well Name:Depth (MD)to ft
Location:(TVD)to ft
Operator:
Report Prepared By:Formation:
Report Delivered To:Date:
Hydrocarbon Ratios
Depth ft Gas Units Mud Chlorides (mg/L) = C1 C1 C1 C1.
Flowline Background Show C2 C3 C4 C5
ppm ppm ppm
Hydrocarbon Ratios
C1 -=C1/C2 =
C2 -=C1/C3 =
C3 -=C1/C4 =
C4 -=C1/C5 =
C5 -=
Production
Analysis Gas Oil Water x Non-Producible Hydrocarbons
Depth ft Gas Units Mud Chlorides (mg/L) = .
Flowline Background Show
ppm ppm ppm
Hydrocarbon Ratios
C1 -=C1/C2 =
C2 -=C1/C3 =
C3 -=C1/C4 =
C4 -=C1/C5 =
C5 -=
Production
Analysis Gas Oil Water x Non-Producible Hydrocarbons
Hydrocarbon Ratios
Depth ft Gas Units Mud Chlorides (mg/L) = C1 C1 C1 C1.
Flowline Background Show C2 C3 C4 C5
ppm ppm ppm
Hydrocarbon Ratios
C1 -=C1/C2 =
C2 -=C1/C3 =
C3 =C1/C4 =
C4 -=C1/C5 =
C5 -=
Production
Analysis Gas Oil Water x Non-Producible Hydrocarbons
Depth ft Gas Units Mud Chlorides (mg/L) = .
Flowline Background Show
ppm ppm ppm
Hydrocarbon Ratios
C1 -=C1/C2 =
C2 -=C1/C3 =
C3 -=C1/C4 =
C4 -=C1/C5 =
C5 -=
Production
Analysis Gas Oil Water x Non-Producible Hydrocarbons
1
2
3
4
125 53 72
85 70
155 65
No producible oil within these zones based upon gas and chromatograph data collected.
90
140414054
78000129361325
145 102
320
43
190246 3112
152614850
257 50 207
625 34 591
124
598 92 506
166
25 123
320 88
148
232
172370 13932 158438
164243
8531
308
155
497
2187221
157 34 123
558 61
326 105
153099
77500
1245
693
300
77000
1193
1553
633
538
13416
155275 146744
489 49
1265
0.00
136 184
15 109
187134
72 94
1717
904
2599
861
2201
317
Interpretation:
Show Report Report # 5
14900
3592
12900
3668
OA-Sands
17-Mar-2014
80000
313
SP24-SE1
Spy Island
ENI Petroluem
Kori Jo Plowman
Andrew Buchanan
1630
11144
1
10
100
1000
Oil
Gas
NPH
NPH
1
10
100
1000
NPH
Oil
Gas
NPH
Well Name:Depth (MD)to ft
Location:(TVD)to ft
Operator:
Report Prepared By:Formation:
Report Delivered To:Date:
no
Depth ft C1 C1 C1 C1
Flowline Background Show C2 C3 C4 C5
ppm ppm ppm
Hydrocarbon Ratios
C1 -=C1/C2 =
C2 -=C1/C3 =
C3 -=C1/C4 =
C4 -=C1/C5 =
C5 -=
Production
Analysis Gas Oil Water x Non-Producible Hydrocarbons
Depth ft
Flowline Background Show
ppm ppm ppm
Hydrocarbon Ratios
C1 -=C1/C2 =
C2 -=C1/C3 =
C3 -=C1/C4 =
C4 -=C1/C5 =
C5 -=
Production
Analysis Gas Oil Water x Non-Producible Hydrocarbons
Depth ft C1 C1 C1 C1
Flowline Background Show C2 C3 C4 C5
ppm ppm ppm
Hydrocarbon Ratios
C1 -=C1/C2 =
C2 -=C1/C3 =
C3 =C1/C4 =
C4 -=C1/C5 =
C5 -=
Production
Analysis Gas Oil Water x Non-Producible Hydrocarbons
Depth ft
Flowline Background Show
ppm ppm ppm
Hydrocarbon Ratios
C1 -=C1/C2 =
C2 -=C1/C3 =
C3 -=C1/C4 =
C4 -=C1/C5 =
C5 -=
Production
Analysis Gas Oil Water x Non-Producible Hydrocarbons
Free Oil in Mud
Intensity
Color
none
lt
brn
wh
Cut Fluorescence
712 108 604 707
315 84 231 451
Fluorescence
Cuttings Analysis:
596 234 362 1338
279 157 122
469
6125 Gas Units 1154 Mud Chlorides (mg/L) =
Residual Cut
stmg-bloom
dul
wh
56108 12986 43122 234
78000
148 0 148
174058 10799 163259 270
529 251 278
460
3
92 315
252 115 137 1268
142 50
7409 Gas Units 1415 Mud Chlorides (mg/L) =83000
627
255 51
131918
4
204
278 88 190
Gas Units 1114 Mud Chlorides (mg/L) =
70 34
Hydrocarbon Ratios
14 513 498
256 72 184
595 110 485 674
7048 77000
317
139705 11701 128004 264
104
2
400 4 396
252 0 252
847
527
1014 Mud Chlorides (mg/L) =78000
6538 125380 244
Oil Show Rating
Residual FlourescenceColor
Amount 70%
even
dul
pl straw/bnColor
1 Hydrocarbon Ratios
5866 Gas Units
Cut yel
3930 4008
ENI Petroleum
Interpretation:
This interval displays a non-producible hydrocarbons and is not associated with any heavy hydrocarbon gases.
Show Report Report # 6
SP24-SE1L1 5327 7801
Spy Island, AK
none-fntAmountTypeStain
Jade Miller OA-1
Andrew Buchanan 3/29/2014
Odor
brnColorColor
pl straw/bnIntensity
IntensityAmountDistribution
Color
1
10
100
1000
Oil
Gas
NPH
NPH
1.0
10.0
100.0
1000.0
NPH
Oil
Gas
NPH
1
10
100
1000
Oil
Gas
NPH
NPH
1
10
100
1000
NPH
Oil
Gas
NPH
Well Name:Depth (MD)to ft
Location:(TVD)to ft
Operator:
Report Prepared By:Formation:
Report Delivered To:Date:
no
Depth ft C1 C1 C1 C1
Flowline Background Show C2 C3 C4 C5
ppm ppm ppm
Hydrocarbon Ratios
C1 -=C1/C2 =
C2 -=C1/C3 =
C3 -=C1/C4 =
C4 -=C1/C5 =
C5 -=
Production
Analysis Gas Oil Water x Non-Producible Hydrocarbons
Depth ft
Flowline Background Show
ppm ppm ppm
Hydrocarbon Ratios
C1 -=C1/C2 =
C2 -=C1/C3 =
C3 -=C1/C4 =
C4 -=C1/C5 =
C5 -=
Production
Analysis Gas Oil Water x Non-Producible Hydrocarbons
Depth ft C1 C1 C1 C1
Flowline Background Show C2 C3 C4 C5
ppm ppm ppm
Hydrocarbon Ratios
C1 -=C1/C2 =
C2 -=C1/C3 =
C3 =C1/C4 =
C4 -=C1/C5 =
C5 -=
Production
Analysis Gas Oil Water x Non-Producible Hydrocarbons
Depth ft
Flowline Background Show
ppm ppm ppm
Hydrocarbon Ratios
C1 -=C1/C2 =
C2 -=C1/C3 =
C3 -=C1/C4 =
C4 -=C1/C5 =
C5 -=
Production
Analysis Gas Oil Water x Non-Producible Hydrocarbons
Free Oil in Mud
Intensity
Color
none
lt
brn
wh
Cut Fluorescence
877 137 740 866
320 81 239 558
Fluorescence
Cuttings Analysis:
596 225 371 1534
280 145 135
574
8650 Gas Units 1204 Mud Chlorides (mg/L) =
Residual Cut
stmg-bloom
dul
wh
149735 5016 144719 224
81500
280 108 172
221829 14742 207087 280
533 231 302
519
3
252 330
528 89 439 762
281 29
10229 Gas Units 1827 Mud Chlorides (mg/L) =81000
749
265 56
160442
4
209
267 81 186
Gas Units 1434 Mud Chlorides (mg/L) =
66 190
Hydrocarbon Ratios
91 626 588
695 48 647
687 125 562 842
9581 79000
335
168757 12163 156594 279
256
2
564 128 436
295 47 248
848
717
1334 Mud Chlorides (mg/L) =84000
14520 145922 233
Oil Show Rating
Residual FlourescenceColor
Amount 30%
even
dul
pl straw/bnColor
1 Hydrocarbon Ratios
8354 Gas Units
Cut wh
4008 4029
ENI Petroleum
Interpretation:
This interval displays a good oil show, but is not associated with anyproduciible hydrocarbons. It is dominated by unconsolidated, fine to very fine grain,
subrounded to subangular, well sorted, quartz sand. It is slightly silty in part.
Show Report Report # 7
SP24-SE1L1 7801 10275
Spy Island, AK
none-fntAmountTypeStain
Jade Miller
Andrew Buchanan 3/29/2014
Odor
brnColorColor
ltIntensity
IntensityAmountDistribution
Color
1
10
100
1000
Oil
Gas
NPH
NPH
1.0
10.0
100.0
1000.0
NPH
Oil
Gas
NPH
1
10
100
1000
Oil
Gas
NPH
NPH
1
10
100
1000
NPH
Oil
Gas
NPH
Well Name:Depth (MD)to ft
Location:(TVD)to ft
Operator:
Report Prepared By:Formation:
Report Delivered To:Date:
Yes
Depth ft C1 C1 C1 C1
Flowline Background Show C2 C3 C4 C5
ppm ppm ppm
Hydrocarbon Ratios
C1 -=C1/C2 =
C2 -=C1/C3 =
C3 -=C1/C4 =
C4 -=C1/C5 =
C5 -=
Production
Analysis Gas Oil Water x Non-Producible Hydrocarbons
Depth ft
Flowline Background Show
ppm ppm ppm
Hydrocarbon Ratios
C1 -=C1/C2 =
C2 -=C1/C3 =
C3 -=C1/C4 =
C4 -=C1/C5 =
C5 -=
Production
Analysis Gas Oil Water x Non-Producible Hydrocarbons
Depth ft C1 C1 C1 C1
Flowline Background Show C2 C3 C4 C5
ppm ppm ppm
Hydrocarbon Ratios
C1 -=C1/C2 =
C2 -=C1/C3 =
C3 =C1/C4 =
C4 -=C1/C5 =
C5 -=
Production
Analysis Gas Oil Water x Non-Producible Hydrocarbons
Depth ft
Flowline Background Show
ppm ppm ppm
Hydrocarbon Ratios
C1 -=C1/C2 =
C2 -=C1/C3 =
C3 -=C1/C4 =
C4 -=C1/C5 =
C5 -=
Production
Analysis Gas Oil Water x Non-Producible Hydrocarbons
Free Oil in Mud
Intensity
Color
none
lt
brn
wh
Cut Fluorescence
731 13 718 929
240 5 235 437
Fluorescence
Cuttings Analysis:
533 34 499 839
290 30 260
1391
11478 Gas Units 2619 Mud Chlorides (mg/L) =
Residual Cut
stmg-bloom
dul
wh
303848 109060 194788 376
77000
288 130 158
219617 1411 218206 304
556 4 552
495
3
140 914
571 358 213 3246
289 149
12312 Gas Units 1795 Mud Chlorides (mg/L) =78000
969
282 0
209297
4
282
271 0 271
Gas Units 2258 Mud Chlorides (mg/L) =
227 60
Hydrocarbon Ratios
75 772 895
964 446 518
834 0 834 1008
11853 78000
525
273446 204 273242 328
287
2
547 160 387
273 46 227
1286
847
1766 Mud Chlorides (mg/L) =81500
6054 203243 263
Oil Show Rating
Residual FlourescenceColor
Amount 30%
even
dul
pl straw/bnColor
1 Hydrocarbon Ratios
10802 Gas Units
Cut wh
4029 4030
ENI Petroleum
Interpretation:
This interval displays a good oil show, but is not associated with any producible hydrocarbons.
Show Report Report # 8
SP24-SE1L1 10275 12749
Spy Island, AK
none-fntAmountTypeStain
Jade Miller
Andrew Buchanan 3/29/2014
Odor
brnColorColor
ltIntensity
IntensityAmountDistribution
Color
1
10
100
1000
Oil
Gas
NPH
NPH
1.0
10.0
100.0
1000.0
NPH
Oil
Gas
NPH
1
10
100
1000
Oil
Gas
NPH
NPH
1
10
100
1000
NPH
Oil
Gas
NPH
Well Name:Depth (MD)to ft
Location:(TVD)to ft
Operator:
Report Prepared By:Formation:
Report Delivered To:Date:
Yes
Depth ft C1 C1 C1 C1
Flowline Background Show C2 C3 C4 C5
ppm ppm ppm
Hydrocarbon Ratios
C1 -=C1/C2 =
C2 -=C1/C3 =
C3 -=C1/C4 =
C4 -=C1/C5 =
C5 -=
Production
Analysis Gas Oil Water x Non-Producible Hydrocarbons
Depth ft
Flowline Background Show
ppm ppm ppm
Hydrocarbon Ratios
C1 -=C1/C2 =
C2 -=C1/C3 =
C3 -=C1/C4 =
C4 -=C1/C5 =
C5 -=
Production
Analysis Gas Oil Water x Non-Producible Hydrocarbons
Depth ft C1 C1 C1 C1
Flowline Background Show C2 C3 C4 C5
ppm ppm ppm
Hydrocarbon Ratios
C1 -=C1/C2 =
C2 -=C1/C3 =
C3 =C1/C4 =
C4 -=C1/C5 =
C5 -=
Production
Analysis Gas Oil Water x Non-Producible Hydrocarbons
Depth ft
Flowline Background Show
ppm ppm ppm
Hydrocarbon Ratios
C1 -=C1/C2 =
C2 -=C1/C3 =
C3 -=C1/C4 =
C4 -=C1/C5 =
C5 -=
Production
Analysis Gas Oil Water x Non-Producible Hydrocarbons
Free Oil in Mud
Intensity
Color
none
lt
brn
wh
Cut Fluorescence
738 41 697 1888
142 15 127 1016
Fluorescence
Cuttings Analysis:
288 52 236 2284
143 38 105
1647
13713 Gas Units 2950 Mud Chlorides (mg/L) =
Residual Cut
stmg-bloom
dul
wh
342683 10033 332650 388
78000
225 93 132
245285 5489 239796 344
360 147 213
1012
3
202 973
458 116 342 2446
237 35
15110 Gas Units 2047 Mud Chlorides (mg/L) =80000
1437
179 29
326278
4
150
180 59 121
Gas Units 2248 Mud Chlorides (mg/L) =
90 136
Hydrocarbon Ratios
79 792 1626
940 82 858
788 216 572 1781
14156 79000
977
270966 55482 215484 377
226
2
438 115 323
228 34 194
2390
871
2760 Mud Chlorides (mg/L) =84000
10839 315439 398
Oil Show Rating
Residual FlourescenceColor
Amount 30%
even
dul
pl straw/bnColor
1 Hydrocarbon Ratios
12942 Gas Units
Cut wh
4009 4030
ENI Petroleum
Interpretation:
This interval displays a good oil show, but is not associated with any heavy hydrocarbon gases.
Show Report Report # 9
SP24-SE1L1 12749 15225
Spy Island, AK
none-fntAmountTypeStain
Jade Miller
Andrew Buchanan 3/29/2014
Odor
brnColorColor
ltIntensity
IntensityAmountDistribution
Color
1
10
100
1000
Oil
Gas
NPH
NPH
1.0
10.0
100.0
1000.0
NPH
Oil
Gas
NPH
1
10
100
1000
Oil
Gas
NPH
NPH
1
10
100
1000
NPH
Oil
Gas
NPH
SP24-SE1 & SP24-SE1 L1
Eni Petroleum
MI Swaco
Doyon 15
AK-XX-0901144926
Date Depth Wt Vis PV YP Gels Filt
R600/R300/R200/R100/
R6/R3 Cake Solids Oil/Water Sd Pm pH MBT Pf/Mf Chlor Hard
ft - MD ppg sec lb/100 lb/100ft2 m/30m Rheometer 32nds %%%ppb Eqv mg/l Ca++
25-Feb 0 8.80 140 25 52 21/37/52 5.3 102/77/61/43/19/16 2/NA 2.0 /98 9.1 19.0 .05/.30 1100 68 circulating
26-Feb 752 9.00 112 28 35 23/50/60 6.1 91/63/51/38/22/17 2/NA 4.0 /96 0.25 0.15 9.6 23.0 .10/.30 2300 96 Drilling ahead
27-Feb 1568 9.20 119 30 37 24/52/64 5.1 97/67/54/39/24/19 2/NA 4.5 /96 0.20 0.20 9.6 25.0 .10/.40 2100 72 Drilling ahead
28-Feb 2834 9.30 80 28 30 19/44/59 5.8 86/58/47/34/18/14 /NA 4.5 /96 0.20 0.25 9.6 25.0 .15/.4 1800 36 Drilling ahead
1-Mar 2915 9.20 78 27 28 20/43/57 5.8 82/55/43/31/19/13 2/NA 4.5 /96 0.20 0.25 9.5 26.5 .15/.4 1300 36 Running casing
2-Mar 2915 9.20 49 15 12 4/9/11 6.0 42/27/17/11/4/3 2/NA 4.0 /96 0.20 0.20 9.3 24.0 .10/.35 1100 36 N/U BOP
3-Mar 2915 9.30 48 12 19 10/12/13 6.2 43/31/29/23/11/10 1/NA 3.0 2/95 -0.25 9.6 -.15/.80 800 40 M/U BHA
4-Mar 3310 9.20 53 13 21 11/13/15 5.6 47/34/31/24/13/10 2/NA 4.0 3/94 -0.35 9.9 2.0 .25/1.10 800 44 Drilling ahead
5-Mar 4422 9.30 53 13 13 12/20/23 5.1 52/39/34/26/14/10 2/NA 4.0 3/93 0.10 0.30 9.5 10.0 .15/.90 1100 48 Drilling ahead
6-Mar 5263 9.30 55 13 33 16/29/34 4.5 59/46/39/31/15/13 1/NA 5.0 3/92 0.15 0.35 10.0 14.0 .20/1.10 1300 40 BROOH
7-Mar 5263 9.30 48 13 27 15/28/35 4.7 53/40/35/27/14/11 1/NA 5.0 3/92 0.15 0.30 9.8 14.0 .15/1.00 1300 42 Change out TPR
8-Mar 5263 9.30 44 15 18 --48/33 ----------Condition Mud
9-Mar 5263 9.30 44 15 17 --47/32/23/17/7/6 ----------R/D BOP test equipment
10-Mar 5263 9.30 44 15 17 --47/32/23/17/7/6 ----------M/U BHA #4
Date Depth Wt Vis PV YP Gels HTHP
R600/R300/R200/R100/
R6/R3 Cake Solids Oil/Water
Alka
POM
Excess
Lime Elec Stab CaCl2 WPS LGS/HGS ASG Remarks
ft - MD ppg sec lb/100 lb/100ft2 m/30m Rheometer 32nds %%ml ppb volts ppb ppm ppb ASG
11-Mar 6084 9.25 46 15 16 8/8/8 4.9 46/31/25/19/8/7 NA/2 6.29 66/34 3.2 4.16 703 31.00 -2.32/59.12 2.8 Drill 8.75" Hole
12-Mar 8457 9.25 45 15 18 8/8/9 4.1 48/33/27/20/8/7 NA/1 6.25 66/34 2.9 3.77 763 31.47 -2.68/58.37 2.8 Drill 8.75" Hole
13-Mar 11018 9.3 46 15 17 8/8/9 4.7 47/32/27/19/8/7 NA/2 7.18 67/33 2.8 3.64 760 29.93 -4.97/64.96 2.8 Drill 8.75" Hole
14-Mar 13316 9.25 48 15 18 8/8/9 4.9 48/33/27/20/8/7 NA/1 7.83 69/31 2.65 3.45 761 30.61 -4.41/66.58 2.8 Drill 8.75" Hole
15-Mar 15240 9.25 48 15 17 8/8/8 4.9 47/32/26/18/8/7 NA/1 8.25 68/32 2.7 3.51 721 30.39 -8.26/66.58 2.8 BROOH
16-Mar 15240 9.25 48 15 19 8/8/8 4.8 49/34/27/20/8/7 NA/2 7.20 68/32 2.7 3.51 743 30.39 -4.29/65.95 2.8 BROOH
17-Mar 15240 9.25 46 15 16 7/8/8 4.9 46/31/25/18/7/6 NA/2 6.49 67/33 2.5 3.25 761 30.59 -4.25/59.01 2.8 BROOH
18-Mar 15240 9.25 46 15 16 7/8/8 -46/31/25/19/7/6 -6.56 67/33 2.5 3.25 763 30.21 -4.66/59.3 2.8 RIH w/5.5" Lnr.
19-Mar 5036 9.25 46 14 17 7/7/8 -45/31/25/18/7/6 -6.54 67/33 2.5 3.25 745 30.34 -4.52/59.2 2.8 Run Cmt. Logs
20-Mar 5080 9.35 49 14 16 7/7/8 -44/30/24/17/7/6 -7.64 67/33 2.4 3.12 692 30.42 -9.97/64.12 2.8 Mill casing window
21-Mar 5196 9.4 53 15 15 7/8/8 4.6 45/30/24/17/7/6 NA/1 7.69 67/33 2.15 2.8 618 30.15 -8.6/66.08 2.8 BROOH
22-Mar 5325 9.3 51 15 16 7/8/8 -46/31/25/17/7/6 NA/-7.25 67/33 2.35 3.06 613 29.53 -7.49/62.96 2.8 Drill 8.75" Hole
23-Mar 6396 9.25 53 16 19 7/8/8 4.6 51/35/27/19/7/6 NA/1 7.79 67/33 2.60 3.38 613 29.62 -6.89/68.88 2.8 Drill 8.75" Hole
24-Mar 9114 9.30 51 16 21 8/9/9 4.6 53/37/29/21/8/7 NA/1 7.62 67/33 2.45 3.19 656.0 30.55 -7.11/66.96 3 Drill 8.75" Hole
25-Mar 11706 9.30 52 17 22 8/9/9 4.6 56/39/32/23/8/7 NA/1 7.4 67/33 2.40 3.12 742.0 29.0 -5.7/65.85 3 Drill 8.75" Hole
26-Mar 13587 9.30 49 16 20 8/9/9 4.8 52/36/29/21/8/7 NA/1 7.2 67/33 2.25 2.93 725.0 30.1 -8.12/61.32 3 Drill 8.75" Hole
27-Mar 15056 9.30 49 17 20 7/8/8 4.2 54/37/31/22/7/6 NA/1 6.9 68/32 2.10 2.73 805.0 32.3 -7.74/59.16 3 Downlink MWD Exceed
28-Mar 15225 9.25 47 16 17 7/7/8 -49/33/27/19/7/6 NA/-7.25 69/31 2.40 3.12 880 31.98 -8.32/62.08 2.8 BROOH
29-Mar
Casing Record
SPUD:26-Feb-2014
SPERRY JOB:TD:27-Mar-2014
Remarks
20" Conductor @ 160' MD, 160' TVD
13.375" Casing @ 2900' MD, 2450' TVD
9.625" Casing @ 5237' MD, 3916' TVD
WELL NAME:LOCATION:Spy Island
OPERATOR:AREA:Nikaitchuq Field
MUD CO:STATE:Alaska
RIG:
W
a
t
e
r
a
n
d
O
i
l
B
a
s
e
d
M
u
d
R
e
c
o
r
d
BHA#SDL
RUN #Bit #Bit Type Bit
Size Depth In Depth
Out Footage Bit
Hours TFA AVG
ROP
WOB
(max)
RPM
(max)
SPP
(max)
FLOW GPM
(max)Bit Grade Comments
2 130 1 Hughes MX-1 Mill Tooth 16.00 160 2915 2755 27.40 1.117 100.5 20 40 1700 750 1-1-WT-A-E-In-No-TD Surface Hole
3 200 2 Smith GF15B PDC 12.25 2915 5263 2348 29.20 1.117 80.4 25 40 1580 800 2-6-BT-G-E-2-WT-TD Intermediate Hole
4 300 3 Hycalog - SKH616M-E1D - PDC 8.75 5237 15240 10003 68.10 0.902 271.0 21.5 179 2080 566 1-1-CT-A-X-IN-NO-TD Production
7 400 4 Smith XR+CPS Mill Tooth 8.75 5136 5326 200 3.20 0.746 62.9 15 40 1550 450 1-1-WT-A-E-I-NO-BHA Kick off Whipstock
8 500 5 Hycalog - SKH616M-E1D - PDC 8.75 5326 15225 9899 70.00 0.902 267.4 5.9 175 2656 563 1-1-CT-A-X-IN-NO-TD Production
WELL NAME:SP24-SE1 & SP24-SE1 L1 LOCATION:Spy Island
OPERATOR:Eni Petroleum AREA:Nikaitchuq Field
MUD CO:
SPERRY JOB:AK-XX-0901144926 TD:27-Mar-2014
MI Swaco STATE:Alaska
RIG:Doyon 15 SPUD:26-Feb-2014
B
i
t
R
e
c
o
r
d
.
.
*
24 hr Recap:Pre-spud meeting. Flood conductor, located leak, drain and repair conductor.
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
Chlorides
mg/l
1100.00
0
25-Feb-2014
12:00 AM
Current Pump & Flow Data:
69
Max
ROP
ROP (ft/hr)
4.23 @
Mud Data
Depth
Morning Report Report # 1
Customer:
Well:
Area:
Location:
Rig:
SP24-SE1
ENI PETROLEUM
SPY ISLAND
NORTH SLOPE
Job No.:
Daily Charges:
Total Charges:
MWD Summary
96%
Rig Activity:
DOYON15 Report For:
ConditionBit #
2
2.0
16Hughes MX-1 Mill Tooth
8.80
Size
160'
100% Gas In Air=10,000 UnitsConnection
0
Tools
API FL
Chromatograph (ppm)
160'
WOB
EVEMAR
Avg Min
Comments
RPM
ECD
(ppg)
ml/30min
Background (max)Trip
Average
Mud Type
Lst
Type
Spud 5.30'52
Depth in / out
YP
(lb/100ft2)
9.10
000
00
CementChtSilt
C-4i C-4n
24 hr Max
Weight
0
Hours
C-3
Ss
(ppb Eq)
C-1 C-5i
AK-AM-0901144926
SPUD
PV
Footage
M.ROSS/O.AMEND
ShClyst TuffGvlCoal
cP
25
Gas Summary
0
0 0
(current)
Avg
to0'
Yesterday's Depth:
Current Depth:
24 Hour Progress:
0.0 Flow In (gpm)
Flow In (spm)
0'
0'
0'
Max @ ft Current
0'0.0
Date:
Time:
Flood conductor, prime pumps, PT mud lines. No leaks, blow down top drive. M/U BHA. Establish clean out rates.
in
Minimum
Depth C-5n
0.0
C-2
SPP (psi)
Gallons/stroke
TFABit Type
Depth
19.0140
MBT
0'
pH
1.117
0
0
0
Siltst
72
17
Units*
Casing
Summary
Lithology (%)
00
0
907-685-0772Unit Phone:
0
Paul Kalenuik
Maximum
Report By:Logging Engineers:Paul Kalenuik/Jade Miller
Set AtSize
178.9 X-65
Grade
20.00''
(max)(current)
0
0
Cly
0
.
.
*
24 hr Recap:
(max)(current)
0
0
Cly
1542
Set AtSize
178.9 X-65
Grade
20.00''
907-685-0772Unit Phone:
0
Paul Kalenuik
Maximum
Report By:Logging Engineers:Paul Kalenuik/Jade Miller
218
0
589
129
Units*
Casing
Summary
Lithology (%)
0
MBT pH
1.117
0
0
0
Siltst
SPP (psi)
Gallons/stroke
TFABit Type
Depth
23.0112
C-5n
753'
67.0
C-2
10
in
0Minimum
Depth
Time:
Drilling ahead at a dept of 866'MD at time of report.
4
0'
842'
842'
Max @ ft Current
646'12.7
Date:
Avg
to0'
Yesterday's Depth:
Current Depth:
24 Hour Progress:
506.0 Flow In (gpm)
Flow In (spm)
Gas Summary
0
0 0
(current)
J.KEENER/O.AMEND
ShClyst TuffGvlCoal
cP
28
Footage
Ss
(ppb Eq)
C-1 C-5i
AK-AM-0901144926
DRILLING AHEAD
PV
24 hr Max
Weight
0
Hours
C-3
00
CementChtSilt
C-4i C-4n
YP
(lb/100ft2)
9.60
000
Spud 6.1752'35
Depth in / out
Mud Type
Lst
Type
Average
2Background (max)Trip
9.30
Avg Min
Comments
RPM
ECD
(ppg)
ml/30min
Tools
TeleScope 825,ARC 825,GyroPulse Collar
API FL
Chromatograph (ppm)
160'
WOB
EVEMAR
100% Gas In Air=10,000 UnitsConnection
0
160'
ConditionBit #
2
4.0
16Hughes MX-1 Mill Tooth
9.00
Size
Job No.:
Daily Charges:
Total Charges:
MWD Summary
96%
Rig Activity:
DOYON15 Report For:
Morning Report Report # 2
Customer:
Well:
Area:
Location:
Rig:
SP24-SE1
ENI PETROLEUM
SPY ISLAND
NORTH SLOPE
ROP
ROP (ft/hr)
4.23 @
Mud Data
Depth
26-Feb-2014
12:00 AM
Current Pump & Flow Data:
874
Max
0
Chlorides
mg/l
2300.00
Clean-out conductor, P/U BHA02, drill ahead and survey every 15’ to 500’ MD to ensure safety from anti-collision.
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
.
.
*
24 hr Recap:Continuing to drill ahead in Surface section. Currently at a depth of 1713'MD at time of report.
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
Chlorides
mg/l
2100.00
0
27-Feb-2014
12:00 AM
Current Pump & Flow Data:
936
Max
ROP
ROP (ft/hr)
4.23 @
Mud Data
Depth
Morning Report Report # 3
Customer:
Well:
Area:
Location:
Rig:
SP24-SE1
ENI PETROLEUM
SPY ISLAND
NORTH SLOPE
Job No.:
Daily Charges:
Total Charges:
MWD Summary
96%
Rig Activity:
DOYON15 Report For:
ConditionBit #
2
4.5
16Hughes MX-1 Mill Tooth
9.20
Size
160'
100% Gas In Air=10,000 UnitsConnection
0
Tools
TeleScope 825,ARC 825,GyroPulse Collar
API FL
Chromatograph (ppm)
160'
WOB
EVEMAR
9.30
Avg Min
Comments
RPM
ECD
(ppg)
ml/30min
4Background (max)Trip
Average
Mud Type
Lst
Type
Spud 5.11568'37
Depth in / out
YP
(lb/100ft2)
9.60
000
00
CementChtSilt
C-4i C-4n
24 hr Max
Weight
0
Hours
C-3
Ss
(ppb Eq)
C-1 C-5i
AK-AM-0901144926
DRILLING AHEAD
PV
Footage
J.KEENER/O.AMEND
ShClyst TuffGvlCoal
cP
30
Gas Summary
0
0 0
(current)
Avg
to0'
Yesterday's Depth:
Current Depth:
24 Hour Progress:
592.0 Flow In (gpm)
Flow In (spm)
842'
1695'
853'
Max @ ft Current
1096'27.0
Date:
Time:
19
in
2Minimum
Depth C-5n
1685'
67.0
C-2
83
SPP (psi)
Gallons/stroke
TFABit Type
Depth
25.0119
MBT pH
1.117
0
0
0
Siltst
591
120
Units*
Casing
Summary
Lithology (%)
02115
47
907-685-0772Unit Phone:
0
Paul Kalenuik
Maximum
Report By:Logging Engineers:Paul Kalenuik/Jade Miller
Set AtSize
178.9 X-65
Grade
20.00''
(max)(current)
0
0
Cly
10919
.
.
*
24 hr Recap:
(max)(current)
0
0
Cly
53737
Set AtSize
178.9 X-65
Grade
20.00''
907-685-0772Unit Phone:
0
Paul Kalenuik
Maximum
Report By:Logging Engineers:Paul Kalenuik/Jade Miller
13684
66
286
39
Units*
Casing
Summary
Lithology (%)
0
MBT pH
1.117
0
0
0
Siltst
SPP (psi)
Gallons/stroke
TFABit Type
Depth
25.080
C-5n
1944'
0.0
C-2
378
in
2Minimum
Depth
Time:
2915' MD and 2462' TVD @ 22:23.
103
1695'
2915'
854'
Max @ ft Current
2638'46.0
Date:
Avg
to0'
Yesterday's Depth:
Current Depth:
24 Hour Progress:
419.0 Flow In (gpm)
Flow In (spm)
Gas Summary
0
0 0
(current)
J.KEENER/O.AMEND
ShClyst TuffGvlCoal
cP
28
Footage
Ss
(ppb Eq)
C-1 C-5i
AK-AM-0901144926
DRILLING AHEAD
PV
24 hr Max
Weight
0
Hours
C-3
00
CementChtSilt
C-4i C-4n
YP
(lb/100ft2)
9.60
000
Spud 5.82834'30
Depth in / out
Mud Type
Lst
Type
Average
15Background (max)
Trip
9.30
Avg Min
Comments
RPM
ECD
(ppg)
ml/30min
Tools
TeleScope 825,ARC 825,GyroPulse Collar
API FL
Chromatograph (ppm)
160'
WOB
EVEMAR
100% Gas In Air=10,000 UnitsConnection
0
160'
ConditionBit #
2
4.5
16Hughes MX-1 Mill Tooth
9.30
Size
Job No.:
Daily Charges:
Total Charges:
MWD Summary
96%
Rig Activity:
DOYON15 Report For:
Morning Report Report # 4
Customer:
Well:
Area:
Location:
Rig:
SP24-SE1
ENI PETROLEUM
SPY ISLAND
NORTH SLOPE
ROP
ROP (ft/hr)
4.23 @
Mud Data
Depth
28-Feb-2014
12:00 AM
Current Pump & Flow Data:
782
Max
0
Chlorides
mg/l
100.00
F/2839' t/2869' encountered packing off and stuck pipe, pulled 40k over w/30K TQ. Continued to drill ahead to TD of
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
.
.
*
24 hr Recap:L/D BHA #2 as per SLB. Clean and clear rig floor. R/U to run 13 3/8" CSG.
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
Chlorides
mg/l
1300.00
0
1-Mar-2014
12:00 AM
Current Pump & Flow Data:
57
Max
ROP
ROP (ft/hr)
4.23 @
Mud Data
Depth
Morning Report Report # 5
Customer:
Well:
Area:
Location:
Rig:
SP24-SE1
ENI PETROLEUM
SPY ISLAND
NORTH SLOPE
Job No.:
Daily Charges:
Total Charges:
MWD Summary
96%
Rig Activity:
DOYON15 Report For:
Condition
2
Bit #
2
4.5
16Hughes MX-1 Mill Tooth
9.20
Size
160'
100% Gas In Air=10,000 UnitsConnection
0
Tools
API FL
Chromatograph (ppm)
16.6160' 2915'
WOB
EVEMAR
Avg Min
Comments
RPM
ECD
(ppg)
ml/30min
Background (max)
Trip
Average
724
Mud Type
Lst
Type
18.0
Spud 5.82915'28
Depth in / out
YP
(lb/100ft2)
9.50
000
00
CementChtSilt
C-4i C-4n
24 hr Max
68.0
Weight
0
Hours
C-3
Ss
(ppb Eq)
C-1 C-5i
AK-AM-0901144926
Running Casing
PV
2755'
Footage
27.50
J.KEENER/O.AMEND
ShClyst TuffGvlCoal
cP
27
Gas Summary
0
0 0
(current)
Avg
to
Yesterday's Depth:
Current Depth:
24 Hour Progress:
0.0 Flow In (gpm)
Flow In (spm)
2915'
2915'
0'
Max @ ft Current
0'0.0
Date:
Time:
Run casing as per detail t/1174'MD,
in
Minimum
Depth C-5n
0.0
C-2
SPP (psi)
Gallons/stroke
TFABit Type
Depth
26.578
L-80
MBT pH
1.117
0
0
0
Siltst
13 3/8"
35
7
Units*
Casing
Summary
Lithology (%)
0
907-685-0772Unit Phone:
0
Paul Kalenuik
Maximum
Report By:Logging Engineers:Paul Kalenuik/Jade Miller
Set AtSize
178.9 X-65
Grade
20.00''
(max)(current)
BTC
0
0
Cly
.
.
*
24 hr Recap:
(max)(current)
BTC
0
0
Cly
Set AtSize
178.9 X-65
Grade
20.00''
907-685-0772Unit Phone:
0
Paul Kalenuik
Maximum
Report By:Logging Engineers:Paul Kalenuik/Jade Miller
13 3/8"
0
0
Units*
Casing
Summary
Lithology (%)
0
L-80
MBT pH
1.117
0
0
0
Siltst
SPP (psi)
Gallons/stroke
TFABit Type
Depth
24.048
C-5n
0.0
C-2
in
Minimum
Depth
Time:
2915'
2915'
0'
Max @ ft Current
0'0.0
Date:
Avg
to
Yesterday's Depth:
Current Depth:
24 Hour Progress:
0.0 Flow In (gpm)
Flow In (spm)
Gas Summary
0
0 0
(current)
J.KEENER/O.AMEND
ShClyst TuffGvlCoal
cP
15
2755'
Footage
27.50
Ss
(ppb Eq)
C-1 C-5i
AK-AM-0901144926
N/U BOPE
PV
24 hr Max
68.0
Weight
0
Hours
C-3
00
CementCht Silt
C-4i C-4n
YP
(lb/100ft2)
9.50
000
18.0
Spud 6.02915'12
Depth in / out
Mud Type
Lst
Type
Average
Background
(max)
Trip
Avg Min
Comments
RPM
ECD (ppg)
ml/30min
Tools
API FL
Chromatograph (ppm)
16.6160' 2915'
WOB
EVEMAR
100% Gas In Air=10,000 UnitsConnection
0
2901'
160'
Condition
1-1-WT-A-E-In-No-TD
Bit #
2
4.0
16Hughes MX-1 Mill Tooth
9.20
Size
Job No.:
Daily Charges:
Total Charges:
MWD Summary
96%
Rig Activity:
DOYON15 Report For:
Morning Report Report # 6
Customer:
Well:
Area:
Location:
Rig:
SP24-SE1
ENI PETROLEUM
SPY ISLAND
NORTH SLOPE
ROP
ROP (ft/hr)
4.23 @
Mud Data
Depth
2-Mar-2014
12:00 AM
Current Pump & Flow Data:
35
Max
0
Chlorides
mg/l
1100.00
Finish running casing, cement, NU BOPE
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
.
.
*
24 hr Recap:
(max)(current)
BTC
0
0
Cly
Set AtSize
178.9 X-65
Grade
20.00''
907-685-0772Unit Phone:
0
Kori Jo Plowman
Maximum
Report By:Logging Engineers:Kori Jo Plowman/Jade Miller
13 3/8"
0
0
Units*
Casing
Summary
Lithology (%)
0
L-80
MBT pH
1.117
0
0
0
Siltst
SPP (psi)
Gallons/stroke
TFABit Type
Depth
24.048
C-5n
0.0
C-2
in
Minimum
Depth
Time:
2915'
2915'
0'
Max @ ft Current
0'0.0
Date:
Avg
to
Yesterday's Depth:
Current Depth:
24 Hour Progress:
0.0 Flow In (gpm)
Flow In (spm)
Gas Summary
0
0 0
(current)
J.KEENER/O.AMEND
ShClyst TuffGvlCoal
cP
12
2755'
12.25 1.117
Footage
27.50
Ss
(ppb Eq)
C-1 C-5i
AK-AM-0901144926
M/U BHA
PV
24 hr Max
68.0
Weight
0
Hours
C-3
00
CementCht Silt
C-4i C-4n
YP
(lb/100ft2)
9.60
000
18.0
Smith GF15B PDC
Spud/LSND 6.22915'19
Depth in / out
Mud Type
Lst
Type
Average
Background
(max)
Trip
Avg Min
Comments
RPM
ECD (ppg)
ml/30min
Tools
API FL
Chromatograph (ppm)
16.6160' 2915'
WOB
EVEMAR
100% Gas In Air=10,000 UnitsConnection
0
3
2901'
160'
Condition
1-1-WT-A-E-In-No-TD
Bit #
2
3.0
16Hughes MX-1 Mill Tooth
9.30
Size
Job No.:
Daily Charges:
Total Charges:
MWD Summary
96%
Rig Activity:
DOYON15 Report For:
Morning Report Report # 7
Customer:
Well:
Area:
Location:
Rig:
SP24-SE1
ENI PETROLEUM
SPY ISLAND
NORTH SLOPE
ROP
ROP (ft/hr)
4.23 @
Mud Data
Depth
3-Mar-2014
12:00 AM
Current Pump & Flow Data:
35
Max
0
Chlorides
mg/l
800.00
Service rig. Test BOPE. Rig down BOPE equipment, pull test plug, install wear ring per Vetco Grey. M/U BHA
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
.
.
*
24 hr Recap:Continue to M/U BHA #3. RIH t/1600' MD, shallow hole test. RIH t/2721' MD, perform CSG test @ 2500 psi. Drill out
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
Chlorides
mg/l
800.00
0
4-Mar-2014
12:00 AM
Current Pump & Flow Data:
1086
Max
ROP
ROP (ft/hr)
4.23 @
Mud Data
Depth
Morning Report Report # 8
Customer:
Well:
Area:
Location:
Rig:
SP24-SE1
ENI PETROLEUM
SPY ISLAND
NORTH SLOPE
Job No.:
Daily Charges:
Total Charges:
MWD Summary
96%
Rig Activity:
9.43
DOYON15 Report For:
Condition
1-1-WT-A-E-In-No-TD
Bit #
2
4.0
16Hughes MX-1 Mill Tooth
9.20
Size
3
Sandstone: trnsl-trnsp-lt gy-brn-blk-gn, med-f gr, sb ang-sb rnd, mod srt, uncons, abd mic, abd pyr.
2901'
160'
100% Gas In Air=10,000 UnitsConnection
0
Tools
API FL
Chromatograph (ppm)
16.6160' 2915'
WOB
EVEMAR
9.439.43
Avg Min
Comments
RPM
ECD (ppg)
ml/30min
4Background
(max)
Trip
Average
Mud Type
Lst
100
Type
18.0
Smith GF15B PDC
Spud/LSND 5.63310'21
Depth in / out
YP
(lb/100ft2)
9.90
000
00
CementCht Silt
C-4i C-4n
24 hr Max
68.0
Weight
0
Hours
C-3
Ss
(ppb Eq)
C-1 C-5i
AK-AM-0901144926
Drilling ahead
PV
2755'
12.25 1.117
Footage
27.50
J.KEENER/O.AMEND
ShClyst TuffGvlCoal
cP
13
Gas Summary
0
0 0
(current)
Avg
to
Yesterday's Depth:
Current Depth:
24 Hour Progress:
839.0 Flow In (gpm)
Flow In (spm)
2915'
3465'
550'
Max @ ft Current
3323'164.0
Date:
Time:
15
in
2 3384'Minimum
Depth C-5n
3079'
49.0
C-2
35
SPP (psi)
Gallons/stroke
TFABit Type
Depth
2.053
L-80
MBT pH
1.117
0
0
0
Siltst
13 3/8"
735
161
Units*
Casing
Summary
Lithology (%)
01615
169
907-685-0772Unit Phone:
0
Kori Jo Plowman
Maximum
Report By:Logging Engineers:Kori Jo Plowman/Jade Miller
Set AtSize
178.9 X-65
Grade
20.00''
(max)(current)
BTC
0
0
Cly
4421
.
.
*
24 hr Recap:
(max)(current)
BTC
0
0
Cly
2433
Set AtSize
178.9 X-65
Grade
20.00''
907-685-0772Unit Phone:
0
Kori Jo Plowman
Maximum
Report By:Logging Engineers:Kori Jo Plowman/Jade Miller
10
1615
291
13 3/8"
735
161
Units*
Casing
Summary
Lithology (%)
0
L-80
MBT pH
1.117
0
0
0
Siltst
SPP (psi)
Gallons/stroke
TFABit Type
Depth
10.053
C-5n
4264'
0.0
C-2
19
in
2 4295'Minimum
Depth
Time:
7
3465'
4554'
1089'
Max @ ft Current
4027'137.0
Date:
Avg
to
Yesterday's Depth:
Current Depth:
24 Hour Progress:
783.0 Flow In (gpm)
Flow In (spm)
Gas Summary
0
0 0
(current)
J.KEENER/R. WIMMER
ShClyst TuffGvlCoal
cP
13
2755'
12.25 1.117
Footage
27.50
Ss
(ppb Eq)
C-1 C-5i
AK-AM-0901144926
Drilling ahead
PV
24 hr Max
68.0
Weight
0
Hours
C-3
00
CementCht Silt
C-4i C-4n
YP
(lb/100ft2)
9.50
000
18.0
Smith GF15B PDC
LSND 5.14422'26
Depth in / out
Mud Type
Lst
90
Type
Average
4Background
(max)
Trip
9.519.73
Avg Min
Comments
RPM
ECD (ppg)
ml/30min
Tools
API FL
Chromatograph (ppm)
16.6160' 2915'
WOB
EVEMAR
100% Gas In Air=10,000 UnitsConnection
0
3
Sandstone: trnsl-trnsp-clr-lt gy-brn-blk-gn, med-f gr, sb ang-sb rnd, mod srt, uncons, abd mic, tr pyr, sli slty, r c ctgs.
2901'
160'
Condition
1-1-WT-A-E-In-No-TD
Bit #
2
4.0
16Hughes MX-1 Mill Tooth
9.30
Size
Job No.:
Daily Charges:
Total Charges:
MWD Summary
96%
Rig Activity:
9.94
DOYON15 Report For:
Morning Report Report # 9
Customer:
Well:
Area:
Location:
Rig:
SP24-SE1
ENI PETROLEUM
SPY ISLAND
NORTH SLOPE
ROP
ROP (ft/hr)
4.23 @
Mud Data
Depth
5-Mar-2014
12:00 AM
Current Pump & Flow Data:
1239
Max
0
Chlorides
mg/l
1100.00
Continue to drill ahead from 3465' MD to 4554' MD. The max gas observed was 19 units at 4264' MD
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
.
.
*
24 hr Recap:Drill from 4554' MD to 5263' MD, TD intermediate section. The max gas observed was 400 units at 4842' MD.
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
Chlorides
mg/l
1300.00
11
6-Mar-2014
12:00 AM
Current Pump & Flow Data:
1650
Max
ROP
ROP (ft/hr)
4.23 @
Mud Data
Depth
Morning Report Report # 10
Customer:
Well:
Area:
Location:
Rig:
SP24-SE1
ENI PETROLEUM
SPY ISLAND
NORTH SLOPE
Job No.:
Daily Charges:
Total Charges:
MWD Summary
96%
Rig Activity:
10.08
DOYON15 Report For:
Condition
1-1-WT-A-E-In-No-TD
Bit #
2
5.0
16Hughes MX-1 Mill Tooth
9.30
Size
3
Sandstone: trnsl-trnsp-lt gry-dk gry-brn-blk-tn, med-vf gr, sb ang-sb rnd, mod srt, uncons, r mic, tr pyr, slty.
2901'
160'
100% Gas In Air=10,000 UnitsConnection
33
Tools
API FL
Chromatograph (ppm)
16.6160' 2915'
WOB
EVEMAR
9.619.87
Avg Min
Comments
RPM
ECD (ppg)
ml/30min
Background
(max)
Trip
Average
62
Mud Type
Lst
70
Type
18.0
Smith GF15B PDC
LSND 4.55263'33
Depth in / out
YP
(lb/100ft2)
10.00
000
00
CementCht Silt
C-4i C-4n
24 hr Max
68.0
Weight
48
Hours
C-3
Ss
(ppb Eq)
C-1 C-5i
AK-AM-0901144926
BROOH
PV
2755'
12.25 1.117
Footage
27.50
J.KEENER/R. WIMMER
ShClyst TuffGvlCoal
cP
13
Gas Summary
0
0 0
(current)
Avg
to
Yesterday's Depth:
Current Depth:
24 Hour Progress:
255.5 Flow In (gpm)
Flow In (spm)
4554'
5263'
709'
Max @ ft Current
4726'94.9
Date:
Time:
64
in
2 5048'Minimum
Depth C-5n
4842'
0.0
C-2
400
SPP (psi)
Gallons/stroke
TFABit Type
Depth
14.055
L-80
MBT pH
1.117
0
0
0
Siltst
13 3/8"
852
172
Units*
Casing
Summary
Lithology (%)
0
30
8056
582
907-685-0772Unit Phone:
0
Kori Jo Plowman
Maximum
Report By:Logging Engineers:Kori Jo Plowman/Jade Miller
Set AtSize
178.9 X-65
Grade
20.00''
(max)(current)
BTC
248
0
Cly
54559
.
.
*
24 hr Recap:
(max)(current)
BTC
0
0
Cly
0
Set AtSize
178.9 X-65
Grade
20.00''
907-685-0772Unit Phone:
0
Kori Jo Plowman
Maximum
Report By:Logging Engineers:Kori Jo Plowman/Jade Miller
0
0
13 3/8"
Units*
Casing
Summary
Lithology (%)
0
L-80
MBT pH
1.117
0
0
0
Siltst
SPP (psi)
Gallons/stroke
TFABit Type
Depth
14.048
C-5nC-2
in
Minimum
Depth
Time:
5263'
5263'
0'
Max @ ft Current
Date:
Avg
to
Yesterday's Depth:
Current Depth:
24 Hour Progress:
Flow In (gpm)
Flow In (spm)
Gas Summary
0
0 0
(current)
J.KEENER/R. WIMMER
ShClyst TuffGvlCoal
cP
13
2755'
12.25 1.117
Footage
27.50
Ss
(ppb Eq)
C-1 C-5i
AK-AM-0901144926
Change out TPR
PV
24 hr Max
68.0
Weight
0
Hours
C-3
00
CementCht Silt
C-4i C-4n
YP
(lb/100ft2)
9.80
000
18.0
Smith GF15B PDC
LSND 4.75263'27
Depth in / out
Mud Type
Lst
Type
Average
84Background
(max)
Trip
9.619.87
Avg Min
Comments
RPM
ECD (ppg)
ml/30min
Tools
API FL
Chromatograph (ppm)
16.6160' 2915'
WOB
EVEMAR
100% Gas In Air=10,000 UnitsConnection
0
3
2901'
160'
Condition
1-1-WT-A-E-In-No-TD
Bit #
2
5.0
16Hughes MX-1 Mill Tooth
9.30
Size
Job No.:
Daily Charges:
Total Charges:
MWD Summary
96%
Rig Activity:
10.08
DOYON15 Report For:
Morning Report Report # 11
Customer:
Well:
Area:
Location:
Rig:
SP24-SE1
ENI PETROLEUM
SPY ISLAND
NORTH SLOPE
ROP
ROP (ft/hr)
4.23 @
Mud Data
Depth
7-Mar-2014
12:00 AM
Current Pump & Flow Data:
Max
0
Chlorides
mg/l
1300.00
BROOH 4700' MD to 2900' MD. POOH, lay down BHA #3 and clean rig floor. Max trip gas observed 84u.
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
.
.
*
24 hr Recap:R/U Test equipment, R/D Test equipment, pull test plug and set wear ring, RIH with 9 5/8" casing, set casing at
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
Chlorides
mg/l
0
8-Mar-2014
12:00 AM
Current Pump & Flow Data:
Max
2-6-BT-G-E-2-WT-TD
ROP
ROP (ft/hr)
4.23 @
Mud Data
Depth
Morning Report Report # 12
Customer:
Well:
Area:
Location:
Rig:
SP24-SE1
ENI PETROLEUM
SPY ISLAND
NORTH SLOPE
Job No.:
Daily Charges:
Total Charges:
MWD Summary
96%
Rig Activity:
DOYON15 Report For:
Condition
1-1-WT-A-E-In-No-TD
Bit #
1 16Hughes MX-1 Mill Tooth
9.30
Size
2
gas 61u.
2901'
160'
100% Gas In Air=10,000 UnitsConnection
0
Tools
API FL
Chromatograph (ppm)
25
16.6160' 2915'
WOB
EVEMAR
Avg Min
Comments
RPM
ECD (ppg)
ml/30min
Background
(max)
Trip
Average
61u
Mud Type
Lst
HYDRIL
Type
40
18.0
Smith GF15B PDC
LSND
2915'
5263'18
5263'
Depth in / out
YP
(lb/100ft2)
000
00
CementCht Silt
C-4i C-4n
24 hr Max
68.0
Weight
0
Hours
C-3
Ss
(ppb Eq)
C-1 C-5i
AK-AM-0901144926
Condition Mud
PV
2755'
12.25 1.117
Footage
29.20 2348'
27.50
J.KEENER/R. WIMMER
ShClyst TuffGvlCoal
cP
15
40.0
Gas Summary
0
0 0
(current)
Avg
to
Yesterday's Depth:
Current Depth:
24 Hour Progress:
Flow In (gpm)
Flow In (spm)
5263'
5263'
0'
Max @ ft Current
Date:
Time:
in
Minimum
Depth C-5nC-2
SPP (psi)
Gallons/stroke
TFABit Type
Depth
44
L-80
MBT pH
1.117
0
0
0
Siltst
13 3/8"
Units*
Casing
Summary
Lithology (%)
00
0
907-685-0772Unit Phone:
0
Kori Jo Plowman
Maximum
Report By:Logging Engineers:Kori Jo Plowman/Jade Miller
Set AtSize
178.9 X-65
Grade
L-80
20.00''
9 5/8''
(max)(current)
BTC
0
0
Cly
0
.
.
*
24 hr Recap:
(max)(current)
BTC
0
0
Cly
0
Set AtSize
178.9 X-65
Grade
L-805237'
20.00''
9 5/8''
907-685-0772Unit Phone:
0
Kori Jo Plowman
Maximum
Report By:Logging Engineers:Kori Jo Plowman/Jade Miller
0
0
13 3/8"
Units*
Casing
Summary
Lithology (%)
0
L-80
MBT pH
1.117
0
0
0
Siltst
SPP (psi)
Gallons/stroke
TFABit Type
Depth
44
C-5nC-2
in
Minimum
Depth
Time:
5263'
5263'
0'
Max @ ft Current
Date:
Avg
to
Yesterday's Depth:
Current Depth:
24 Hour Progress:
Flow In (gpm)
Flow In (spm)
40.0
Gas Summary
0
0 0
(current)
J.KEENER/R. WIMMER
ShClyst TuffGvlCoal
cP
15
2755'
12.25 1.117
Footage
29.20 2348'
27.50
Ss
(ppb Eq)
C-1 C-5i
AK-AM-0901144926
R/D BOP test equip
PV
24 hr Max
68.0
Weight
0
Hours
C-3
00
CementCht Silt
C-4i C-4n
YP
(lb/100ft2)
000
40
18.0
Smith GF15B PDC
LSND
2915'
5263'17
5263'
Depth in / out
Mud Type
Lst
HYDRIL
Type
Average
Background
(max)
Trip
Avg Min
Comments
RPM
ECD (ppg)
ml/30min
Tools
API FL
Chromatograph (ppm)
25
16.6160' 2915'
WOB
EVEMAR
100% Gas In Air=10,000 UnitsConnection
0
2
2901'
160'
Condition
1-1-WT-A-E-In-No-TD
Bit #
1 16Hughes MX-1 Mill Tooth
9.30
Size
Job No.:
Daily Charges:
Total Charges:
MWD Summary
96%
Rig Activity:
DOYON15 Report For:
Morning Report Report # 13
Customer:
Well:
Area:
Location:
Rig:
SP24-SE1
ENI PETROLEUM
SPY ISLAND
NORTH SLOPE
2-6-BT-G-E-2-WT-TD
ROP
ROP (ft/hr)
4.23 @
Mud Data
Depth
9-Mar-2014
12:00 AM
Current Pump & Flow Data:
Max
0
Chlorides
mg/l
Pumped cement, Injectivity test, R/D cementt equipment and clean rig floor. N/D BOP stack, cut casing, N/U BOP
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
.
.
*
24 hr Recap:
(max)(current)
BTC
0
0
Cly
0
Set AtSize
178.9 X-65
Grade
L-805237'
20.00''
9 5/8''
907-685-0772Unit Phone:
0
Kori Jo Plowman
Maximum
Report By:Logging Engineers:Kori Jo Plowman/Jade Miller
0
0
13 3/8"
Units*
Casing
Summary
Lithology (%)
0
L-80
MBT pH
1.117
0
0
0
Siltst
SPP (psi)
Gallons/stroke
TFABit Type
Depth
44
C-5nC-2
in
Minimum
Depth
Time:
5263'
5263'
0'
Max @ ft Current
Date:
Avg
to
Yesterday's Depth:
Current Depth:
24 Hour Progress:
Flow In (gpm)
Flow In (spm)
40.0
Gas Summary
0
0 0
(current)
J.KEENER/R. WIMMER
ShClyst TuffGvlCoal
cP
15
2348'
8.75 0.902
Footage
29.20
Ss
(ppb Eq)
C-1 C-5i
AK-AM-0901144926
M/U BHA #4
PV
24 hr Max
68.0
Weight
0
Hours
C-3
00
CementCht Silt
C-4i C-4n
YP
(lb/100ft2)
000
40
Hycalog - SKH616M-E1D - PDC
LSND
5237'
5263'17
Depth in / out
Mud Type
Lst
HYDRIL
Type
Average
Background
(max)
Trip
Avg Min
Comments
RPM
ECD
(ppg)
ml/30min
Tools
API FL
Chromatograph (ppm)
252915' 5263'
WOB
EVEMAR
100% Gas In Air=10,000 UnitsConnection
0
3
2901'
160'
Condition
2-6-BT-G-E-2-WT-TD
Bit #
2 12.25Smith GF15B PDC
9.30
Size
Job No.:
Daily Charges:
Total Charges:
MWD Summary
96%
Rig Activity:
DOYON15 Report For:
Morning Report Report # 14
Customer:
Well:
Area:
Location:
Rig:
SP24-SE1
ENI PETROLEUM
SPY ISLAND
NORTH SLOPE
ROP
ROP (ft/hr)
4.23 @
Mud Data
Depth
10-Mar-2014
12:00 AM
Current Pump & Flow Data:
Max
0
Chlorides
mg/l
Pull test plug and set wear ring. Clean rig floor. P/U 5" DP and R/U test equipment, test 9-5/8" casing. P/U BHA
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
.
.
*
24 hr Recap:
Report By:
20.00''
9 5/8''
Logging Engineers:Kori Jo Plowman/Jade Miller
(max)(current)
BTC
Cly
Depth in / out
L-805237'
Bit Type RPM
40
907-685-0772Unit Phone:
49
Kori Jo Plowman
Set AtSize
178.9 X-65
Grade
291
C-2
Gas Summary
120
169
0
135
107480
0 0
56640
862
5469'Minimum
Depth
13 3/8"
Maximum
in
3
6355'
0
197 113
435
458
Alkal
Coal
Gallons/stroke
L-80
0
5263'
6363'
1100'
Lime
TuffGvl
C-5n
Yesterday's Depth:
Current Depth:
24 Hour Progress:
95
SPP (psi)
Max @ ft
6030'
Date:
Time:
API FL
Depth
0'
Avg
to 0'
Current
200.70.0
(current)
Units*
ClystSs Cht Silt
Casing
Summary
Lithology (%)
1.117
1546
2348'
8.75 0.902
Footage
40.0
Drill 8.75" Hole
PV
cP
68.0
Weight
Flow In (gpm)
Flow In (spm)
Oil / Water
Hours
0
Cement
C-1 C-5i
ShSiltst
Chromatograph (ppm)
425 203
33139
C-4i C-4n
83
Lst
100
HYDRIL
(lb/100ft2)
9.25
Type
16
Hycalog - SKH616M-E1D - PDC
Mud (lb/bbl)ml/30min
4.163.20
25
C-3
Average
Trip
(max)
253
Comments
76Background
2901'
100% Gas In Air=10,000 UnitsConnection
fluor, blmg brt blwh ct fluor, lt amb ct, hvy lt amb res, brt blwh res fluor.
SST : trnsl-trnsp-dk gry-brn-blk-gn, f-vf gr, sb ang-sb rnd, w srt, uncons, tr glauc, r pyr, sli slty, SHOW: no stn, 100% even brt blwh
Bit #
2 12.25 2915'
3 5237'
29.20
Size
160'EVEMAR
5263'
WOB
Smith GF15B PDC
TFA Condition
2-6-BT-G-E-2-WT-TD
MWD Summary
96%
%Mud Type
FAZEPRO NA
Ratio
Mud Data
Depth
1.9
4.23 @
Current Pump & Flow Data:
DOYON15 Report For:
6084'6.3
9.85 10.70
Cor Solids
10.40
Avg Min
YP
MaxECD
(ppg)
Tools
ENI PETROLEUM
SPY ISLAND
NORTH SLOPE
Job No.:
Daily Charges:
Total Charges:
Rig Activity:
226.1
Morning Report Report # 15
Customer:
Well:
Area:
Location:
Rig:
SP24-SE1
11-Mar-2014
12:00 AM
AK-AM-0901144926
1197
ROP
ROP (ft/hr)
J.KEENER/R. WIMMER
24 hr Max
Cont. P/U BHA #4. RIH w/5"DP, shallow hole test, log CSG collars. Displace f/LSND to OBM. Cut and slip drill line,
Density (ppg)
out (sec/qt)
Viscosity
.
.
*
24 hr Recap:
Cly
HYDRIL
Report By:
20.00''
9 5/8''
Logging Engineers:Kori Jo Plowman/Jade Miller
(max)(current)
BTC
Bit Type RPM
40
Hours
907-685-0772Unit Phone:
62
Kori Jo Plowman
Set AtSize
178.9 X-65
Grade
10
1840
C-2
Gas Summary
1225
107
203
28
124
151528
18 18
88365
6558'Minimum
Depth
13 3/8"
Maximum
in
8
7973'
35
228 142
576
SST: trnsl-trnsp-dk gry-brn-blk-gn-tn, f-vf, sb ang-sb rnd, w srt, uncons, tr mic, sli slty, SHOW: lt brn stn, 80% even dull wh fluor,
strmg dull blwh ct fluor, pl straw ct, clr res, dull wh res fluor.
546
Alkal
Coal
Gallons/stroke
L-80
18
6363'
8732'
2369'
Lime
TuffGvl
C-5n
Yesterday's Depth:
Current Depth:
24 Hour Progress:
110
SPP (psi)
Max @ ft
8233'
Date:
Time:
API FL
Depth
0'
Avg
to 0'
Current
265.0293.0
(current)
Units*
ClystSs Cht Silt Lithology (%)
1.117
1545
2348'
8.75 0.902
Footage
40.0
Depth in / out
Drill 8.75" Hole
PV
cP
68.0
Weight
Flow In (gpm)
Flow In (spm)
Oil / Water
43
Cement
C-1 C-5i
ShSiltst
C-4n
Chromatograph (ppm)
633 241
38123
C-4iC-3
Bit #
88
Lst
90
25
(lb/100ft2)
9.25
Type
18
Hycalog - SKH616M-E1D - PDC
Casing
Summary
L-805237'
Mud (lb/bbl)ml/30min
3.772.90
(max)
336Average
Comments
44Background Trip
2901'
100% Gas In Air=10,000 UnitsConnection
2 12.25 2915'
3 5237'
29.20 2-6-BT-G-E-2-WT-TD
Size
160'EVEMAR
5263'
WOB
Smith GF15B PDC
TFA Condition
MWD Summary
96%
%Mud Type
FAZEPRO NA
Ratio
Mud Data
Depth
66/34
4.23 @
Current Pump & Flow Data:
DOYON15 Report For:
8457'6.3
9.94 10.88
Cor Solids
10.52
Avg Min
YP
MaxECD
(ppg)
Tools
ENI PETROLEUM
SPY ISLAND
NORTH SLOPE
Job No.:
Daily Charges:
Total Charges:
Rig Activity:
411.0
Morning Report Report # 16
Customer:
Well:
Area:
Location:
Rig:
SP24-SE1
12-Mar-2014
12:00 AM
AK-AM-0901144926
1906
ROP
ROP (ft/hr)
M.ROSS/R. WIMMER
24 hr Max
Drilling ahead from 6363' MD to 8732' MD. Max gas observed 1225u.
Density (ppg)
out (sec/qt)
Viscosity
.
.
*
24 hr Recap:
Density (ppg)
out (sec/qt)
Viscosity
2304
ROP
ROP (ft/hr)
M.ROSS/R. WIMMER
24 hr Max
Morning Report Report # 17
Customer:
Well:
Area:
Location:
Rig:
SP24-SE1
13-Mar-2014
12:00 AM
AK-AM-0901144926ENI PETROLEUM
SPY ISLAND
NORTH SLOPE
Job No.:
Daily Charges:
Total Charges:
Rig Activity:
374.1
11.40
Cor Solids
11.00
Avg Min
YP
MaxECD
(ppg)
Tools
4.23 @
Current Pump & Flow Data:
DOYON15 Report For:
11018'7.2
2.84
Mud Type
FAZEPRO 4.7
Ratio
Mud Data
Depth
67/33
Size
160'EVEMAR
5263'
WOB
Smith GF15B PDC
TFA Condition
3 5237'
29.20 2-6-BT-G-E-2-WT-TD
Drilling ahead from 8732' MD to 11366' MD. Max gas observed 1344u.
Trip
2901'
100% Gas In Air=10,000 UnitsConnection65Background
(max)
343Average
Mud (lb/bbl)ml/30min
3.642.809.30
Type
17
Hycalog - SKH616M-E1D - PDC
Casing
Summary
L-805237'
2 12.25 2915'
C-3
Bit #
107
Lst
100
52154
C-4i
Chromatograph (ppm)
635 197
24
Cement
C-1 C-5i
ShSiltst
Drill 8.75" Hole
PV
cP
68.0
Weight
Flow In (gpm)
Flow In (spm)
Oil / Water
Lithology (%)
1.117
1546
2348'
8.75 0.902
Footage
40.0
Depth in / out
ClystSs Cht Silt
C-4n
Depth
0'
Avg
to 0'
Current
296.0179.0
MWD Summary
Max @ ft
10887'
Date:
Time:
API FL
C-5n
Yesterday's Depth:
Current Depth:
24 Hour Progress:
112
SPP (psi)
25
(lb/100ft2)
Comments
8732'
11366'
2634'
Lime
TuffGvl
96%
%
556
Alkal
Coal
Gallons/stroke
L-80
644
yel fluor, strmg dull wh ct fluor, pl straw ct, pl straw res, dull wh res fluor.
SST : trns-trnsp-dk gry-brn-blk-gn-tn, f-vf gr, sb ang-sub rnd, mod srt, uncons, tr glauc, r sh frag, slty SHOW: lt brn stn, 80% even fnt
10600'
20
198 128
010498'Minimum
Depth
13 3/8"
Maximum
in
10 13
80527 135
176
16
137
168328
242631
C-2
Gas Summary
1344
907-685-0772Unit Phone:
52
Kori Jo Plowman
Set AtSize
178.9 X-65
Grade
Bit Type RPM
40
Hours
(current)
Units*
Cly
HYDRIL
Report By:
20.00''
9 5/8''
Logging Engineers:Kori Jo Plowman/Jade Miller
(max)(current)
BTC
.
.
*
24 hr Recap:
Cly
HYDRIL
Report By:
20.00''
9 5/8''
Logging Engineers:Kori Jo Plowman/Jade Miller
(max)(current)
BTC
Bit Type RPM
40
Hours
907-685-0772Unit Phone:
52
Kori Jo Plowman
Set AtSize
178.9 X-65
Grade
Gas Summary
1555
(current)
Units*
194658
749766
C-2
32
21142 46
2012997'Minimum
Depth
13 3/8"
Maximum
in
11
12048'
45
195 121
L-80
398
50% even dull yel fluor, strmg dull wh ct fluor, pl straw ct, wh res, fnt wh res fluor.
SST : trns-trnsp-dk gry-brn-blk-gn-tn, f-vf gr, sb ang-sub rnd, w srt, uncons, com glauc, com mic, slty frag, slty SHOW: lt brn stn,
%
546
Alkal
Coal
Gallons/stroke
Comments
11366'
13718'
2352'
Lime
TuffGvl
96%
Date:
Time:
API FL
C-5n
Yesterday's Depth:
Current Depth:
24 Hour Progress:
110
SPP (psi)
Depth
0'
Avg
to 0'
Current
328.1215.0
MWD Summary
ClystSs Cht Silt
C-4n
Lithology (%)
1.117
1548
2348'
8.75 0.902
Footage
40.0
Depth in / out
Drill 8.75" Hole
PV
cP
68.0
Weight
Flow In (gpm)
Flow In (spm)
52
Cement
C-1 C-5i
ShSiltst
71
C-4i
59
173
43
Lst
100
Chromatograph (ppm)
630 185
Type
18
Hycalog - SKH616M-E1D - PDC
Casing
Summary
L-805237'
2 12.25 2915'
Bit #
Mud (lb/bbl)ml/30min
3.452.65
(max)
111Average
123Background
2901'
100% Gas In Air=10,000 UnitsConnection
C-3
Drilling ahead from 11366' MD to 13718' MD. Max gas observed 1555u.
Trip
3 5237'
29.20 2-6-BT-G-E-2-WT-TD25
Size
160'EVEMAR
5263'
WOB
Smith GF15B PDC
TFA Condition
Mud Type
FAZEPRO 4.9
Ratio
Mud Data
Depth
69/319.25
Oil / Water
(lb/100ft2)
4.23 @
Current Pump & Flow Data:
DOYON15 Report For:
13316'7.8
7.97 11.48
Cor Solids
11.11
Avg Min
YP
MaxECD
(ppg)
Tools
ENI PETROLEUM
SPY ISLAND
NORTH SLOPE
Job No.:
Daily Charges:
Total Charges:
Rig Activity:
429.1
Morning Report Report # 18
Customer:
Well:
Area:
Location:
Rig:
SP24-SE1
14-Mar-2014
12:00 AM
AK-AM-0901144926
2442
ROP
ROP (ft/hr)
M.ROSS/R. WIMMER
24 hr Max Max @ ft
13555'
60 26
Density (ppg)
out (sec/qt)
Viscosity
.
.
*
24 hr Recap:
Density (ppg)
out (sec/qt)
Viscosity
42 16
12:00 AM
AK-AM-0901144926
2517
ROP
ROP (ft/hr)
M.ROSS/R. WIMMER
24 hr Max Max @ ft
14816'387.9
Morning Report Report # 19
Customer:
Well:
Area:
Location:
Rig:
SP24-SE1
15-Mar-2014
ENI PETROLEUM
SPY ISLAND
NORTH SLOPE
Job No.:
Daily Charges:
Total Charges:
Rig Activity:
133.00
Cor Solids
11.63
Avg Min
YP
MaxECD
(ppg)
Tools
4.23 @
Current Pump & Flow Data:
DOYON15 Report For:
15196'8.3
10.88
Mud Type
FAZEPRO 4.9
Ratio
Mud Data
Depth
2.19.25
Oil / Water
(lb/100ft2)
5263'
WOB
Smith GF15B PDC
TFA Condition
2-6-BT-G-E-2-WT-TD25
Size
160'EVEMAR
Drilling ahead from 13718' MD to 15240' MD. Monitered well for 10 mins and begin BROOH Max gas observed
Trip
3 5237'
100% Gas In Air=10,000 UnitsConnection
C-3
26Background
(max)
271Average
Mud (lb/bbl)ml/30min
3.512.7017
Hycalog - SKH616M-E1D - PDC
Casing
Summary
L-805237'
2 12.25 2915'
Bit #
2901'
Chromatograph (ppm)
625 124
64
C-4i
55
122
43 55
Cement
C-1 C-5i
ShSiltst Lst
BROOH
PV
cP
68.0
Weight
Flow In (gpm)
Flow In (spm)
Type
Lithology (%)
1.117
1548
2348'
8.75 0.902
Footage
40.0
Depth in / out
ClystSs Cht Silt
100
0'
Avg
to 0'
Current
237.70.0
MWD Summary
Date:
Time:
API FL
C-5n
Yesterday's Depth:
Current Depth:
24 Hour Progress:
110
SPP (psi)
Comments
13718'
15240'
1522'
Lime
TuffGvl
96%
%
541
Alkal
Coal
Gallons/stroke
L-80
537
60% pchy fnt yel fluor, strmg dull wh ct fluor, pl straw ct, clr res, fnt wh res fluor.
SST : trns-trnsp-dk gry-brn-blk-gn-tn, f-vf gr, sb ang-sub rnd, w srt, uncons, com glauc, com mic, sli slty SHOW: lt brn stn,
14851'
53
135 88
14209'Minimum
Depth
13 3/8"
Maximum
in
8
Depth
27
72452 53
190246
608458
C-2
23
C-4n
Gas Summary
1526
(current)
Units*
907-685-0772Unit Phone:
37
Kori Jo Plowman
Set AtSize
178.9 X-65
Grade
Bit Type RPM
40
Hours
29.20
Cly
HYDRIL
Report By:
20.00''
9 5/8''
Logging Engineers:Kori Jo Plowman/Jade Miller
(max)(current)
BTC
.
.
*
24 hr Recap:
Report By:
20.00''
9 5/8''
Logging Engineers:Kori Jo Plowman/Jade Miller
(max)(current)
BTC
40
Hours
29.20
Cly
HYDRIL
907-685-0772Unit Phone:
0
Kori Jo Plowman
Set AtSize
178.9 X-65
Grade
Gas Summary
(current)
Units*
0
00
C-2
0
C-4n
0
0 0
Minimum
Depth
13 3/8"
Maximum
in
Depth
0
0 0
L-80
%
548
Alkal
Coal
Gallons/stroke
Comments
15240'
15240'
0'
Lime
TuffGvl
96%
Date:
Time:
API FL
C-5n
Yesterday's Depth:
Current Depth:
24 Hour Progress:
110
SPP (psi)
0'
Avg
to 0'
Current
MWD Summary
Ss Cht Silt Lithology (%)
1.117
1548
2348'
8.75 0.902
Footage
40.0
Depth in / out
BROOH
PV
cP
68.0
Weight
Flow In (gpm)
Flow In (spm)
Type
Cement
C-1 C-5i
ShSiltst LstClyst
C-4i
0
0
0 0
Chromatograph (ppm)
0 0
5237'
2 12.25 2915'
Bit #
2901'
Bit Type
62
Mud (lb/bbl)ml/30min
3.512.70
(max)
0Average
Background 100% Gas In Air=10,000 UnitsConnection
C-3
Continue to BROOH from 15170' MD t/9168' MD. The max trip gas observed was 62 units.
Trip
3 5237'
25
Size
160'EVEMAR
Hycalog - SKH616M-E1D - PDC
Casing
Summary
L-80
5263'
WOB
Smith GF15B PDC
TFA Condition
2-6-BT-G-E-2-WT-TD
19
RPM
Mud Type
FAZEPRO -
Ratio
Mud Data
Depth
68/329.25
Oil / Water
(lb/100ft2)
4.23 @
Current Pump & Flow Data:
DOYON15 Report For:
15240'7.2
Cor Solids
Avg Min
YP
MaxECD
(ppg)
Tools
ENI PETROLEUM
SPY ISLAND
NORTH SLOPE
Job No.:
Daily Charges:
Total Charges:
Rig Activity:
Morning Report Report # 20
Customer:
Well:
Area:
Location:
Rig:
SP24-SE1
16-Mar-2014
12:00 AM
AK-AM-0901144926
1885
ROP
ROP (ft/hr)
M.ROSS/R. WIMMER
24 hr Max Max @ ft
0 00
Density (ppg)
out (sec/qt)
Viscosity
.
.
*
24 hr Recap:
Density (ppg)
out (sec/qt)
Viscosity
0 00
12:00 AM
AK-AM-0901144926
1542
ROP
ROP (ft/hr)
M.ROSS/R. WIMMER
24 hr Max Max @ ft
Morning Report Report # 21
Customer:
Well:
Area:
Location:
Rig:
SP24-SE1
17-Mar-2014
ENI PETROLEUM
SPY ISLAND
NORTH SLOPE
Job No.:
Daily Charges:
Total Charges:
Rig Activity:
12.83
Cor Solids
10.38
Avg Min
YP
MaxECD
(ppg)
Tools
4.23 @
Current Pump & Flow Data:
DOYON15 Report For:
15240'6.5
9.71
Mud Type
FAZEPRO -
Ratio
Mud Data
Depth
67/339.25
Oil / Water
(lb/100ft2)
5263'
WOB
Smith GF15B PDC
TFA Condition
2-6-BT-G-E-2-WT-TD
16
RPM
25
Size
160'EVEMAR
Hycalog SKH616M-E1D PDC
Casing
Summary
L-80
BROOH f/9168' MD t/5237' MD. @ 5450' MD observed shale beds, work through shale as per K&M. The max trip
Trip
3 5237'
100% Gas In Air=10,000 UnitsConnection
Average
Background
Mud (lb/bbl)ml/30min
3.252.50
(max)
0
C-3
2901'
Bit Type
18
Chromatograph (ppm)
0 0
0
0
0 0
Cement
C-1 C-5i
ShSiltst LstClyst
C-4i
BROOH
PV
cP
68.0
Weight
Flow In (gpm)
Flow In (spm)
Type
46
2348'
8.75 0.902
Footage
40.0
Depth in / out
5237'
12.25 2915'
Ss Cht Silt
Avg
to 0'
Current
MWD Summary
Time:
API FL
C-5n
Yesterday's Depth:
Current Depth:
24 Hour Progress:
110
SPP (psi)
15240'
15240'
0'
Lime
TuffGvl
96%
Date:
%
548
Alkal
Coal
Gallons/stroke
0
0 0
Minimum
Depth
13 3/8"
Maximum
in
Lithology (%)
2
Bit #
0 0
Depth
0'
1.117
15
0
C-2
0
C-4n
0
Gas Summary
(current)
Units*
907-685-0772Unit Phone:
0
Kori Jo Plowman
Set AtSize
178.9 X-65
Grade
40
Hours
29.20
Cly
HYDRIL
L-80
Comments
Report By:
20.00''
9 5/8''
Logging Engineers:Kori Jo Plowman/Jade Miller
(max)(current)
BTC
0
0
.
.
*
24 hr Recap:
Report By:
20.00''
9 5/8''
Logging Engineers:Kori Jo Plowman/Jade Miller
(max)(current)
BTC
0
0
179
40
Hours
29.20
Cly
HYDRIL
L-80
Comments
907-685-0772Unit Phone:
0
Kori Jo Plowman
Set AtSize
178.9 X-65
Grade
Gas Summary
(current)
Units*
0
C-2
0
C-4n
0
0 0
Depth
0'
1.117
15
Minimum
Depth
13 3/8"
Maximum
in
Lithology (%)
2
Bit #
0
0 0
%
Alkal
Coal
Gallons/stroke
15240'
15240'
0'
Lime
TuffGvl
1-1-CT-A-X-IN-NO-TD
96%
Date:
Time:
API FL
C-5n
Yesterday's Depth:
Current Depth:
24 Hour Progress:
SPP (psi)
Avg
to 0'
Current
MWD Summary
Ss Cht Silt
2348'
8.75 0.902
Footage
40.0
Depth in / out
5237'
12.25 2915'
15240'
RIH w/5.5" Lnr.
PV
cP
68.0
Weight
Flow In (gpm)
Flow In (spm)
Type
Cement
C-1 C-5i
ShSiltst LstClyst
C-4i
0
0
0 0
Chromatograph (ppm)
0 0
2901'
Bit Type
12
Mud (lb/bbl)ml/30min
3.252.50
(max)
0
C-3
Average
Background 100% Gas In Air=10,000 UnitsConnection
BROOH and circulate bottoms up. POOH f/2539' MD t/392' MD. L/D BHA #4. Clean rig floor. R/U to run liner, upload
Trip
3 5237'68.10 10003' 22
25
Size
160'EVEMAR
Hycalog SKH616M-E1D PDC
Casing
Summary
L-80
5263'
WOB
Smith GF15B PDC
TFA Condition
2-6-BT-G-E-2-WT-TD
16
RPM
46
Mud Type
FAZEPRO -
Ratio
Mud Data
Depth
67/339.25
Oil / Water
(lb/100ft2)
4.23 @
Current Pump & Flow Data:
DOYON15 Report For:
15240'6.6
9.94 10.20
Cor Solids
10.06
Avg Min
YP
MaxECD
(ppg)
Tools
ENI PETROLEUM
SPY ISLAND
NORTH SLOPE
Job No.:
Daily Charges:
Total Charges:
Rig Activity:
Morning Report Report # 22
Customer:
Well:
Area:
Location:
Rig:
SP24-SE1
18-Mar-2014
12:00 AM
AK-AM-0901144926
34
ROP
ROP (ft/hr)
M.ROSS/O. AMEND
24 hr Max Max @ ft
0 00
Density (ppg)
out (sec/qt)
Viscosity
.
.
*
24 hr Recap:
Density (ppg)
out (sec/qt)
Viscosity
0 00
12:00 AM
AK-AM-0901144926
34
ROP
ROP (ft/hr)
R. WIMMER/O. AMEND
24 hr Max Max @ ft
Morning Report Report # 23
Customer:
Well:
Area:
Location:
Rig:
SP24-SE1
19-Mar-2014
ENI PETROLEUM
SPY ISLAND
NORTH SLOPE
Job No.:
Daily Charges:
Total Charges:
Rig Activity:
10.20
Cor Solids
10.06
Avg Min
YP
MaxECD
(ppg)
Tools
4.23 @
Current Pump & Flow Data:
DOYON15 Report For:
5036'6.6
9.94
Mud Type
FAZEPRO -
Ratio
Mud Data
Depth
67/339.25
Oil / Water
(lb/100ft2)
5263'
WOB
Smith GF15B PDC
TFA Condition
2-6-BT-G-E-2-WT-TD
17
RPM
46
22
25
Size
160'EVEMAR
Hycalog SKH616M-E1D PDC
Casing
Summary
L-80
Finish running liner and lay down liner tools. R/U e-line, RIH and coralate for logs.
Trip
3 5237'68.10
100% Gas In Air=10,000 UnitsConnection
Average
Background
Mud (lb/bbl)ml/30min
3.252.50
(max)
0
C-3
Bit Type
10003'
Chromatograph (ppm)
0 0
0
0
0 0
Cement
C-1 C-5i
ShSiltst LstClyst
C-4i
Run Cmt. Logs
PV
cP
68.0
Weight
Flow In (gpm)
Flow In (spm)
Type
8.75 0.902
Footage
40.0
Depth in / out
5237'
12.25 2915'
15240'
2901'
Ss Cht Silt
Avg
to 0'
Current
MWD Summary
Time:
API FL
C-5n
Yesterday's Depth:
Current Depth:
24 Hour Progress:
SPP (psi)
15240'
15240'
0'
Lime
TuffGvl
1-1-CT-A-X-IN-NO-TD
96%
Date:
%
Alkal
Coal
Gallons/stroke
0
0 0
Minimum
Depth
13 3/8"
Maximum
in
Lithology (%)
2
Bit #
0 0
Depth
0'
1.117
14
0
C-2
0
C-4n
0
Gas Summary
(current)
Units*
907-685-0772Unit Phone:
0
Kori Jo Plowman
Set AtSize
178.9 X-65
Grade
179
40
Hours
29.20
Cly
HYDRIL
L-80
Comments
2348'
Report By:
20.00''
9 5/8''
Logging Engineers:Kori Jo Plowman/Paul Kalenuik
(max)(current)
BTC
0
0
.
.
*
24 hr Recap:
Report By:
20.00''
9 5/8''
Logging Engineers:Kori Jo Plowman/Paul Kalenuik
(max)(current)
BTC
0
0
179
Hours
68.10
Cly
HYDRIL
L-80
Comments
10003'
907-685-0772Unit Phone:
0
Kori Jo Plowman
Set AtSize
178.9 X-65
Grade
Gas Summary
(current)
Units*C-2
0
C-4n
0
0 0
Depth
0'
0.902
14
0Minimum
Depth
13 3/8"
Maximum
in
Lithology (%)
3
Bit #
0
0 0
%
495
Alkal
Coal
Gallons/stroke
15240'
15240'
0'
Lime
TuffGvl
96%
Date:
Time:
API FL
C-5n
Yesterday's Depth:
Current Depth:
24 Hour Progress:
107
SPP (psi)
Avg
to 0'
Current
MWD Summary
Ss Cht Silt
Footage
40.0
Depth in / out
5237'
8.75 5237'
2901'
Mill casing window
PV
cP
68.0
Weight
Flow In (gpm)
Flow In (spm)
Type
Cement
C-1 C-5i
ShSiltst LstClyst
C-4i
0
0
0 0
Chromatograph (ppm)
0 0
6
Mud (lb/bbl)ml/30min
3.122.40
(max)
0
C-3
Average
Background 100% Gas In Air=10,000 UnitsConnection
Continue e-line logging. R/D wireline. R/U BHA #5 and RIH t/TOL, tag @5136' MD. POOH and L/D BHA. M/U upper/
Trip
observed.
4
22
Size
160' EVEMARCasing
Summary
L-80
Bit Type
15240'
WOB
Hycalog SKH616M-E1D PDC
TFA Condition
1-1-CT-A-X-IN-NO-TD
16
RPM
49
Mud Type
FAZEPRO -
Ratio
Mud Data
Depth
67/339.35
Oil / Water
(lb/100ft2)
4.23 @
Current Pump & Flow Data:
DOYON15 Report For:
5080'7.6
Cor Solids
Avg Min
YP
MaxECD (ppg)
Tools
ENI PETROLEUM
SPY ISLAND
NORTH SLOPE
Job No.:
Daily Charges:
Total Charges:
Rig Activity:
Morning Report Report # 24
Customer:
Well:
Area:
Location:
Rig:
SP24-SE1
20-Mar-2014
12:00 AM
AK-AM-0901144926
1086
ROP
ROP (ft/hr)
R. WIMMER/O. AMEND
24 hr Max Max @ ft
0 00
Density (ppg)
out (sec/qt)
Viscosity
.
.
*
24 hr Recap:
Density (ppg)
out (sec/qt)
Viscosity
0 00
12:00 AM
AK-AM-0901144926
80
ROP
ROP (ft/hr)
R. WIMMER/O. AMEND
24 hr Max Max @ ft
5244'150.0
Morning Report Report # 25
Customer:
Well:
Area:
Location:
Rig:
SP24-SE1
21-Mar-2014
ENI PETROLEUM
SPY ISLAND
NORTH SLOPE
Job No.:
Daily Charges:
Total Charges:
Rig Activity:
Cor Solids
Avg Min
YP
MaxECD (ppg)
Tools
4.23 @
Current Pump & Flow Data:
DOYON15 Report For:
5196'7.7
Mud Type
FAZEPRO -
Ratio
Mud Data
Depth
67/339.40
Oil / Water
(lb/100ft2)
15240'
WOB
Hycalog SKH616M-E1D PDC
TFA Condition
1-1-CT-A-X-IN-NO-TD
15
RPM
53
22
Size
160' EVEMAR
Smith XR+CPS Mill tooth
Casing
Summary
L-80
Bit Type
Mill 8.75" window in casing and 28' of rathole to 5126' MD. R/U and perform FIT to 13.0ppg @ 5034' MD. POOH, L/D
Trip
4 5126'
SST: trnsl-trnsp-lt gry-dk gry-brn-blk-gn, med-vf gr, sb ang-sb rnd, ply srt, uncons, r mic, r pyr, sli slty, SHOW: no stn, tr pp fnt fluor,
100% Gas In Air=10,000 UnitsConnection
Average
11Background
Mud (lb/bbl)ml/30min
2.802.15
(max)
0
C-3
Chromatograph (ppm)
9 0
0
0
0 0
Cement
C-1 C-5i
ShSiltst LstClyst
C-4i
BROOH
PV
cP
68.0
Weight
Flow In (gpm)
Flow In (spm)
Type
8.75 0.746
Footage
40.0
Depth in / out
5237'
8.75 5237'
2901'
Ss Cht Silt
80
Avg
to 0'
Current
78.50.0
MWD Summary
Time:
API FL
C-5n
Yesterday's Depth:
Current Depth:
24 Hour Progress:
0
SPP (psi)
5126'
5326'
200'
Lime
TuffGvl
96%
Date:
%
0
Alkal
Coal
Gallons/stroke
22
fnt wh ct fluor, no res.
5192'
0
0 0
Minimum
Depth
13 3/8"
Maximum
in
6
Lithology (%)
3
Bit #
1538 0
5170'
Depth
0'
0.902
15
629
C-2
0
C-4n
0
Gas Summary
41
20(current)
Units*
907-685-0772Unit Phone:
0
Kori Jo Plowman
Set AtSize
178.9 X-65
Grade
179
Hours
68.10
Cly
HYDRIL
L-80
Comments
10003'
Report By:
20.00''
9 5/8''
Logging Engineers:Kori Jo Plowman/Paul Kalenuik
(max)(current)
BTC
4596
0
.
.
*
24 hr Recap:
Report By:
20.00''
9 5/8''
Logging Engineers:Kori Jo Plowman/Paul Kalenuik
(max)(current)
BTC
0
0
179
Hours
68.10
Cly
HYDRIL
L-80
Comments
10003'
907-685-0772Unit Phone:
0
Kori Jo Plowman
Set AtSize
178.9 X-65
Grade
Gas Summary
(current)
Units*C-2
0
C-4n
0
0 0
Depth
0'
0.902
15
0Minimum
Depth
13 3/8"
Maximum
in
Lithology (%)
3
Bit #
0
0 0
%
0
Alkal
Coal
Gallons/stroke
5326'
5326'
0'
Lime
TuffGvl
96%
Date:
Time:
API FL
C-5n
Yesterday's Depth:
Current Depth:
24 Hour Progress:
0
SPP (psi)
Avg
to 0'
Current
MWD Summary
Ss Cht Silt
8.75 0.746
Footage
40.0
Depth in / out
5237'
8.75 5237'
2901'
M/U BHA #8
PV
cP
68.0
Weight
Flow In (gpm)
Flow In (spm)
Type
Cement
C-1 C-5i
ShSiltst LstClyst
C-4i
0
0
0 0
Chromatograph (ppm)
0 0
27
Mud (lb/bbl)ml/30min
3.062.35
(max)
0
C-3
Average
Background 100% Gas In Air=10,000 UnitsConnection
POOH and lay down BHA #7. Rig up BOP test equipment. Test BOP's. Rig down BOP test equipment. Begin to
Trip
4 5126'
22
Size
160' EVEMAR
Smith XR+CPS Mill tooth
Casing
Summary
L-80
Bit Type
15240'
WOB
Hycalog SKH616M-E1D PDC
TFA Condition
1-1-CT-A-X-IN-NO-TD
16
RPM
51
Mud Type
FAZEPRO -
Ratio
Mud Data
Depth
67/339.30
Oil / Water
(lb/100ft2)
4.23 @
Current Pump & Flow Data:
DOYON15 Report For:
5325'7.3
Cor Solids
Avg Min
YP
MaxECD (ppg)
Tools
ENI PETROLEUM
SPY ISLAND
NORTH SLOPE
Job No.:
Daily Charges:
Total Charges:
Rig Activity:
Morning Report Report # 26
Customer:
Well:
Area:
Location:
Rig:
SP24-SE1
22-Mar-2014
12:00 AM
AK-AM-0901144926
35
ROP
ROP (ft/hr)
M. ROSS/O. AMEND
24 hr Max Max @ ft
0 00
Density (ppg)
out (sec/qt)
Viscosity
.
.
*
24 hr Recap:
Density (ppg)
out (sec/qt)
Viscosity
125 57206
12:00 AM
AK-AM-0901144926
1849
ROP
ROP (ft/hr)
M. ROSS/O. AMEND
24 hr Max Max @ ft
5741'462.0
Morning Report Report # 27
Customer:
Well:
Area:
Location:
Rig:
SP24-SE1
23-Mar-2014
ENI PETROLEUM
SPY ISLAND
NORTH SLOPE
Job No.:
Daily Charges:
Total Charges:
Rig Activity:
10.86
Cor Solids
10.39
Avg Min
YP
MaxECD (ppg)
Tools
4.23 @
Current Pump & Flow Data:
DOYON15 Report For:
6396'7.8
9.73
Mud Type
FAZEPRO -
Ratio
Mud Data
Depth
67/339.25
Oil / Water
(lb/100ft2)
5326'
WOB
Smith XR+CPS Mill tooth
TFA Condition
19
RPM
53
15
Size
160' EVEMAR
Hycalog SKH616-E1D
Casing
Summary
L-80
Bit Type
Rig up BHA #8. RIH to 1500' MD and perform shallow hole test. RIH to 5060' MD. Cut and slip drill line, service rig.
Trip
5 5126'
100% Gas In Air=10,000 UnitsConnection
Average
112Background
Mud (lb/bbl)ml/30min
3.382.60
(max)
300
C-3
Chromatograph (ppm)
570 285
172
225
0 0
Cement
C-1 C-5i
ShSiltst LstClyst
C-4i
Drill 8.75" hole
PV
cP
68.0
Weight
Flow In (gpm)
Flow In (spm)
Type
8.75 0.746
Footage
40.0
Depth in / out
5237'
8.75 5126'
2901'
Ss Cht Silt
100
Avg
to 0'
Current
279.0166.0
MWD Summary
Time:
API FL
C-5n
Yesterday's Depth:
Current Depth:
24 Hour Progress:
110
SPP (psi)
5326'
6830'
1504'
Lime
TuffGvl
96%
Date:
%
546
Alkal
Coal
Gallons/stroke
635
SST: trnsl-trnsp-gry-brn-blk-gn, f-v f gr, sb rnd-rnd, wl srt, uncons, tr glauc, tr mic, slislty, SHOW: tr lt brn stn, 50% even dull yel fluor,
strmg brt yel-wh cut fluor, pl straw ct, pl straw res, dull wh res fluor.
6126'
0
250 128
Minimum
Depth
13 3/8"
Maximum
in
5
Lithology (%)
4
Bit #
52665 172
5328'
Depth
0'
0.746
16
243
C-2
0
C-4n
0
Gas Summary
1154
(current)
Units*
907-685-0772Unit Phone:
54
Kori Jo Plowman
Set AtSize
178.9 X-65
Grade
40
Hours
3.20
Cly
HYDRIL
L-80
Comments
200'
Report By:
20.00''
9 5/8''
Logging Engineers:Kori Jo Plowman/Paul Kalenuik
(max)(current)
BTC
147271
0
.
.
*
24 hr Recap:
Report By:
20.00''
9 5/8''
Logging Engineers:Kori Jo Plowman/Paul Kalenuik
(max)(current)
BTC
171002
0
40
Hours
3.20
Cly
HYDRIL
L-80
Comments
200'
907-685-0772Unit Phone:
112
Kori Jo Plowman
Set AtSize
178.9 X-65
Grade
Gas Summary
1415
(current)
Units*C-2
0
C-4n
0
101317 208
8420'
Depth
0'
0.746
16
118Minimum
Depth
13 3/8"
Maximum
in
14
Lithology (%)
4
Bit #
7409'
0
324 201
804
SST: trnsl-trnsp-gry-brn-blk-gn, f-v f gr, sb ang-sb rnd, wl srt, uncons, abd mic, r pyr, sli slty, SHOW: lt brn stn, 90% even brt wh fluor,
strmg brt blwh cut fluor, pl straw ct, pl straw res, brt blwh res fluor.
%
541
Alkal
Coal
Gallons/stroke
6830'
9493'
2663'
Lime
TuffGvl
96%
Date:
Time:
API FL
C-5n
Yesterday's Depth:
Current Depth:
24 Hour Progress:
109
SPP (psi)
Avg
to 0'
Current
277.70.0
MWD Summary
Ss Cht Silt
100
8.75 0.746
Footage
40.0
Depth in / out
5237'
8.75 5126'
2901'
Drill 8.75" hole
PV
cP
68.0
Weight
Flow In (gpm)
Flow In (spm)
Type
Cement
C-1 C-5i
ShSiltst LstClyst
C-4i
197
285
0 0
Chromatograph (ppm)
733 326
Mud (lb/bbl)ml/30min
3.192.45
(max)
491
C-3
Average
115Background 100% Gas In Air=10,000 UnitsConnection
Drill from 6830' MD to 9493' MD. The max gas observed was 1415 units at 7409' MD.
Trip
5 5126'
15
Size
160' EVEMAR
Hycalog SKH616-E1D
Casing
Summary
L-80
Bit Type
5326'
WOB
Smith XR+CPS Mill tooth
TFA Condition
21
RPM
51
Mud Type
FAZEPRO -
Ratio
Mud Data
Depth
67/339.30
Oil / Water
(lb/100ft2)
4.23 @
Current Pump & Flow Data:
DOYON15 Report For:
9114'7.6
10.42 11.24
Cor Solids
10.83
Avg Min
YP
MaxECD (ppg)
Tools
ENI PETROLEUM
SPY ISLAND
NORTH SLOPE
Job No.:
Daily Charges:
Total Charges:
Rig Activity:
491.7
Morning Report Report # 28
Customer:
Well:
Area:
Location:
Rig:
SP24-SE1
24-Mar-2014
12:00 AM
AK-AM-0901144926
2068
ROP
ROP (ft/hr)
M. ROSS/O. AMEND
24 hr Max Max @ ft
7489'
161 74232
Density (ppg)
out (sec/qt)
Viscosity
.
#.
*
24 hr Recap:
Density (ppg)
out (sec/qt)
Viscosity
66 67206
12:00 AM
AK-AM-0901144926
2068
ROP
ROP (ft/hr)
J.Keener/O. Amend
24 hr Max Max @ ft
7489'491.7
Morning Report Report # 29
Customer:
Well:
Area:
Location:
Rig:
SP24-SE1
25-Mar-2014
ENI PETROLEUM
SPY ISLAND
NORTH SLOPE
Job No.:
Daily Charges:
Total Charges:
Rig Activity:
11.50
Cor Solids
11.49
Avg Min
YP
MaxECD (ppg)
Tools
4.23 @
Current Pump & Flow Data:
DOYON15 Report For:
9114'7.4
11.39
Mud Type
FAZEPRO -
Ratio
Mud Data
Depth
67/339.30
Oil / Water
(lb/100ft2)
5326'
WOB
Smith XR+CPS Mill tooth
TFA Condition
22
RPM
52
15
Size
160' EVEMAR
Hycalog SKH616-E1D
Casing
Summary
L-80
Bit Type
Drill from 9493' MD to 12207' MD. The max gas observed was 2620 units at 11478' MD.
Trip
5 5126'
100% Gas In Air=10,000 UnitsConnection
Average
188Background
Mud (lb/bbl)ml/30min
3.122.40
(max)
501
C-3
Chromatograph (ppm)
986 320
178
284
0 0
Cement
C-1 C-5i
ShSiltst LstClyst
C-4i
Drill 8.75" hole
PV
cP
68.0
Weight
Flow In (gpm)
Flow In (spm)
Type
8.75 0.746
Footage
40.0
Depth in / out
5237'
8.75 5126'
2901'
Ss Cht Silt
100
Avg
to 0'
Current
277.70.0
MWD Summary
Time:
API FL
C-5n
Yesterday's Depth:
Current Depth:
24 Hour Progress:
109
SPP (psi)
9493'
12207'
2714'
Lime
TuffGvl
96%
Date:
%
541
Alkal
Coal
Gallons/stroke
1298
Sandstone : trnsp-trnsl-dk gry-brn-blk, f-vf gr, sb rnd-sb ang, wl srt, tr shl frags, uncons, SHOW: lt brn stn, 50% even dull yel fluor,
stmg dull wh cut fluor, pl straw ct, dk straw res, fnt wh res fluor.
11478'
0
316 203
Minimum
Depth
13 3/8"
Maximum
in
14
Lithology (%)
4
Bit #
125618 179
Depth
0'
0.746
17
86
C-2
0
C-4n
0
Gas Summary
2620
(current)
Units*
907-685-0772Unit Phone:
116
A.Paul Kalenuik
Set AtSize
178.9 X-65
Grade
40
Hours
3.20
Cly
HYDRIL
L-80
Comments
200'
Report By:
20.00''
9 5/8''
Logging Engineers:Paul Kalenuik/Jade Miller
(max)(current)
BTC
212237
0
.
#.
*
24 hr Recap:
Report By:
20.00''
9 5/8''
Logging Engineers:Paul Kalenuik/Jade Miller
(max)(current)
BTC
327882
0
40
Hours
3.20
Cly
HYDRIL
L-80
Comments
200'
907-685-0772Unit Phone:
123
A.Paul Kalenuik
Set AtSize
178.9 X-65
Grade
Gas Summary
2761
(current)
Units*C-2
0
C-4n
0
106139 106
Depth
0'
0.746
16
93Minimum
Depth
13 3/8"
Maximum
in
3
Lithology (%)
4
Bit #
12943'
0
304 207
1278
stmg dull wh cut fluor, pl straw ct, lt amb res, dull brn res fluor.
%
546
Alkal
Coal
Gallons/stroke
12207'
13738'
1531'
Lime
TuffGvl
96%
Date:
Time:
API FL
C-5n
Yesterday's Depth:
Current Depth:
24 Hour Progress:
111
SPP (psi)
Avg
to 0'
Current
58.78.3
MWD Summary
Ss Cht Silt
100
8.75 0.746
Footage
40.0
Depth in / out
5237'
8.75 5126'
2901'
Drill 8.75" hole
PV
cP
68.0
Weight
Flow In (gpm)
Flow In (spm)
Type
Cement
C-1 C-5i
ShSiltst LstClyst
C-4i
112
259
0 0
Chromatograph (ppm)
888 255
Mud (lb/bbl)ml/30min
2.932.25
(max)
350
C-3
Average
148Background 100% Gas In Air=10,000 UnitsConnection
Sandstone : trnsp-trnsl-blk-gry-wh-gn, f-vf gr, sb rnd-sb ang, w srt, r glauc, uncons, SHOW: lt brn stn, 80% even dull yl-wh fluor,
Drill from 12207' MD to 13738' MD. The max gas observed was 2761 units at 12943' MD. Continuing to drill ahead.
Trip
5 5126'
15
Size
160' EVEMAR
Hycalog SKH616-E1D
Casing
Summary
L-80
Bit Type
5326'
WOB
Smith XR+CPS Mill tooth
TFA Condition
20
RPM
49
Mud Type
FAZEPRO -
Ratio
Mud Data
Depth
67/339.30
Oil / Water
(lb/100ft2)
4.23 @
Current Pump & Flow Data:
DOYON15 Report For:
13587'7.2
11.39 11.50
Cor Solids
11.49
Avg Min
YP
MaxECD (ppg)
Tools
ENI PETROLEUM
SPY ISLAND
NORTH SLOPE
Job No.:
Daily Charges:
Total Charges:
Rig Activity:
362.0
Morning Report Report # 30
Customer:
Well:
Area:
Location:
Rig:
SP24-SE1
26-Mar-2014
12:00 AM
AK-AM-0901144926
2441
ROP
ROP (ft/hr)
J.Keener/O. Amend
24 hr Max Max @ ft
13466'
98 48133
Density (ppg)
out (sec/qt)
Viscosity
.
#.
*
24 hr Recap:
Density (ppg)
out (sec/qt)
Viscosity
74 34101
12:00 AM
AK-AM-0901144926
2605
ROP
ROP (ft/hr)
J.Keener/O. Amend
24 hr Max Max @ ft
13466'362.0
Morning Report Report # 31
Customer:
Well:
Area:
Location:
Rig:
SP24-SE1
27-Mar-2014
ENI PETROLEUM
SPY ISLAND
NORTH SLOPE
Job No.:
Daily Charges:
Total Charges:
Rig Activity:
11.73
Cor Solids
11.67
Avg Min
YP
MaxECD (ppg)
Tools
4.23 @
Current Pump & Flow Data:
DOYON15 Report For:
15056'6.9
11.61
Mud Type
FAZEPRO -
Ratio
Mud Data
Depth
68/329.30
Oil / Water
(lb/100ft2)
5326'
WOB
Smith XR+CPS Mill tooth
TFA Condition
20
RPM
49
15
Size
160' EVEMAR
Hycalog SKH616-E1D
Casing
Summary
L-80
Bit Type
Drill from 13738' MD to 15225' MD which is TD. The max gas observed was 2951 units at 113713' MD.
Trip
5 5126'
Sandstone : trnsp-trnsl- blk-dk gry-wh-gn, f-v fn gr, sb rnd-sb ang, w srt, tr glauc, tr shl frags, uncons, SHOW: lt brn stn,
100% Gas In Air=10,000 UnitsConnection
Average
63Background
Mud (lb/bbl)ml/30min
2.732.10
(max)
326
C-3
Chromatograph (ppm)
971 237
86
218
0 0
Cement
C-1 C-5i
ShSiltst LstClyst
C-4i
Downlink MWD Exceed
PV
cP
68.0
Weight
Flow In (gpm)
Flow In (spm)
Type
8.75 0.746
Footage
40.0
Depth in / out
5237'
8.75 5126'
2901'
Ss Cht Silt
100
Avg
to 0'
Current
58.70.0
MWD Summary
Time:
API FL
C-5n
Yesterday's Depth:
Current Depth:
24 Hour Progress:
111
SPP (psi)
13738'
15225'
1531'
Lime
TuffGvl
96%
Date:
%
546
Alkal
Coal
Gallons/stroke
1151
60% pchy dull wh fluor, blmg dull wh cut fluor, pl straw ct, straw res, fnt yel res fluor.
13713'
0
245 152
Minimum
Depth
13 3/8"
Maximum
in
17
Lithology (%)
4
Bit #
100241 80
Depth
0'
0.746
17
109
C-2
0
C-4n
0
Gas Summary
2951
(current)
Units*
907-685-0772Unit Phone:
76
A.Paul Kalenuik
Set AtSize
178.9 X-65
Grade
40
Hours
3.20
Cly
HYDRIL
L-80
Comments
200'
Report By:
20.00''
9 5/8''
Logging Engineers:Paul Kalenuik/Jade Miller
(max)(current)
BTC
349503
0
.
#.
*
24 hr Recap:
Report By:
20.00''
9 5/8''
Logging Engineers:Paul Kalenuik/Jade Miller
(max)(current)
BTC
40
Hours
3.20
Cly
HYDRIL
L-80
Comments
200'
907-685-0772Unit Phone:A.Paul Kalenuik
Set AtSize
178.9 X-65
Grade
Gas Summary
(current)
Units*C-2 C-4n
Depth
0'
0.746
16
Minimum
Depth
13 3/8"
Maximum
in
Lithology (%)
4
Bit #
60% pchy dull wh fluor, blmg dull wh cut fluor, pl straw ct, straw res, fnt yel res fluor.
%
531
Alkal
Coal
Gallons/stroke
15225'
15225'
0'
Lime
TuffGvl
96%
Date:
Time:
API FL
C-5n
Yesterday's Depth:
Current Depth:
24 Hour Progress:
108
SPP (psi)
Avg
to 0'
Current
0.0
MWD Summary
Ss Cht Silt
100
8.75 0.746
Footage
40.0
Depth in / out
5237'
8.75 5126'
2901'
BROOH
PV
cP
68.0
Weight
Flow In (gpm)
Flow In (spm)
Type
Cement
C-1 C-5i
ShSiltst LstClyst
C-4i
Chromatograph (ppm)
130
Mud (lb/bbl)ml/30min
3.122.40
(max)
C-3
Average
Background 100% Gas In Air=10,000 UnitsConnection
Sandstone : trnsp-trnsl- blk-dk gry-wh-gn, f-v fn gr, sb rnd-sb ang, w srt, tr glauc, tr shl frags, uncons, SHOW: lt brn stn,
TD Sample:
Cont BROOH f/12715' to 7480' at 530 gpm. PM tour loss:24 bbl. Daily OBM losses: 84 bbls.
Trip
5 5126'
15
Size
160' EVEMAR
Hycalog SKH616-E1D
Casing
Summary
L-80
Bit Type
5326'
WOB
Smith XR+CPS Mill tooth
TFA Condition
17
RPM
47
Mud Type
FAZEPRO -
Ratio
Mud Data
Depth
69/319.25
Oil / Water
(lb/100ft2)
4.23 @
Current Pump & Flow Data:
DOYON15 Report For:
15225'7.3
Cor Solids
10.28
Avg Min
YP
MaxECD (ppg)
Tools
ENI PETROLEUM
SPY ISLAND
NORTH SLOPE
Job No.:
Daily Charges:
Total Charges:
Rig Activity:
Morning Report Report # 32
Customer:
Well:
Area:
Location:
Rig:
SP24-SE1
28-Mar-2014
12:00 AM
AK-AM-0901144926
1700
ROP
ROP (ft/hr)
J.Keener/O. Amend
24 hr Max Max @ ft
34
Density (ppg)
out (sec/qt)
Viscosity
.
#.
*
24 hr Recap:
Density (ppg)
out (sec/qt)
Viscosity
34
12:00 AM
AK-AM-0901144926
ROP
ROP (ft/hr)
J.Keener/O. Amend
24 hr Max Max @ ft
Morning Report Report # 33
Customer:
Well:
Area:
Location:
Rig:
SP24-SE1
29-Mar-2014
ENI PETROLEUM
SPY ISLAND
NORTH SLOPE
Job No.:
Daily Charges:
Total Charges:
Rig Activity:
Cor Solids
Avg Min
YP
MaxECD (ppg)
Tools
4.23 @
Current Pump & Flow Data:
DOYON15 Report For:
15225'7.5
Mud Type
FAZEPRO -
Ratio
Mud Data
Depth
69/319.25
Oil / Water
(lb/100ft2)
5326'
WOB
Smith XR+CPS Mill tooth
TFA Condition
1-1-WT-A-E-I-NO-BHA
16
RPM
52
6
15
Size
160' EVEMAR
Hycalog SKH616-E1D
Casing
Summary
L-80
Bit Type
Service rig. RIH whipstock retreival BHA to 83'. Service rig. PM tour loss: 15 bbls.
Trip
5 5326' 70.00
Sandstone : trnsp-trnsl- blk-dk gry-wh-gn, f-v fn gr, sb rnd-sb ang, w srt, tr glauc, tr shl frags, uncons, SHOW: lt brn stn,
TD Sample:
100% Gas In Air=10,000 UnitsConnection
Average
Background
Mud (lb/bbl)ml/30min
3.062.35
(max)
C-3
9899'
Chromatograph (ppm)
Cement
C-1 C-5i
ShSiltst LstClyst
C-4i
Service Rig
PV
cP
68.0
Weight
Flow In (gpm)
Flow In (spm)
Type
8.75 0.746
Footage
40.0
Depth in / out
5237'
8.75 5126'
15225'
2901'
Ss Cht Silt
100
Avg
to 0'
Current
0.0
MWD Summary
Time:
API FL
C-5n
Yesterday's Depth:
Current Depth:
24 Hour Progress:
SPP (psi)
15225'
15225'
0'
Lime
TuffGvl
1-1-CT-A-X-IN-NO-TD
96%
Date:
%
Alkal
Coal
Gallons/stroke
60% pchy dull wh fluor, blmg dull wh cut fluor, pl straw ct, straw res, fnt yel res fluor.
Minimum
Depth
13 3/8"
Maximum
in
Lithology (%)
4
Bit #
Depth
0'
0.746
14
C-2 C-4n
Gas Summary
(current)
Units*
907-685-0772Unit Phone:A.Paul Kalenuik
Set AtSize
178.9 X-65
Grade
159
40
Hours
3.20
Cly
HYDRIL
L-80
Comments
200'
Report By:
20.00''
9 5/8''
Logging Engineers:Paul Kalenuik/Jade Miller
(max)(current)
BTC
.
#.
*
24 hr Recap:
Report By:
20.00''
9 5/8''
Logging Engineers:Paul Kalenuik/Jade Miller
(max)(current)
BTC
159
40
Hours
3.20
Cly
HYDRIL
L-80
Comments
200'
907-685-0772Unit Phone:A.Paul Kalenuik
Set AtSize
178.9 X-65
Grade
Gas Summary
(current)
Units*C-2 C-4n
Depth
0'
0.746
15
Minimum
Depth
13 3/8"
Maximum
in
Lithology (%)
4
Bit #
60% pchy dull wh fluor, blmg dull wh cut fluor, pl straw ct, straw res, fnt yel res fluor.
%
Alkal
Coal
Gallons/stroke
15225'
15225'
0'
Lime
TuffGvl
1-1-CT-A-X-IN-NO-TD
96%
Date:
Time:
API FL
C-5n
Yesterday's Depth:
Current Depth:
24 Hour Progress:
SPP (psi)
Avg
to 0'
Current
0.0
MWD Summary
Ss Cht Silt
100
8.75 0.746
Footage
40.0
Depth in / out
5237'
8.75 5126'
15225'
2901'
RIH / Liner
PV
cP
68.0
Weight
Flow In (gpm)
Flow In (spm)
Type
Cement
C-1 C-5i
ShSiltst LstClyst
C-4i
9899'
Chromatograph (ppm)
Mud (lb/bbl)ml/30min
3.382.60
(max)
C-3
Average
Background 100% Gas In Air=10,000 UnitsConnection
Sandstone : trnsp-trnsl- blk-dk gry-wh-gn, f-v fn gr, sb rnd-sb ang, w srt, tr glauc, tr shl frags, uncons, SHOW: lt brn stn,
TD Sample:
Drop rabbit. POH. L/D whipstock & retreival tool. C/O saver sub & inspect top drive.
Trip
5 5326' 70.00 6
15
Size
160' EVEMAR
Hycalog SKH616-E1D
Casing
Summary
L-80
Bit Type
5326'
WOB
Smith XR+CPS Mill tooth
TFA Condition
1-1-WT-A-E-I-NO-BHA
17
RPM
49
Mud Type
FAZEPRO -
Ratio
Mud Data
Depth
69/319.25
Oil / Water
(lb/100ft2)
4.23 @
Current Pump & Flow Data:
DOYON15 Report For:
15225'7.2
Cor Solids
Avg Min
YP
MaxECD (ppg)
Tools
ENI PETROLEUM
SPY ISLAND
NORTH SLOPE
Job No.:
Daily Charges:
Total Charges:
Rig Activity:
Morning Report Report # 34
Customer:
Well:
Area:
Location:
Rig:
SP24-SE1
30-Mar-2014
12:00 AM
AK-AM-0901144926
ROP
ROP (ft/hr)
J.Keener/O. Amend
24 hr Max Max @ ft
34
Density (ppg)
out (sec/qt)
Viscosity
.
#.
*
24 hr Recap:
Density (ppg)
out (sec/qt)
Viscosity
12:00 AM
AK-AM-0901144926
ROP
ROP (ft/hr)
J.Keener/O. Amend
24 hr Max Max @ ft
Morning Report Report # 35
Customer:
Well:
Area:
Location:
Rig:
SP24-SE1
31-Mar-2014
ENI PETROLEUM
SPY ISLAND
NORTH SLOPE
Job No.:
Daily Charges:
Total Charges:
Rig Activity:
Cor Solids
Avg Min
YP
MaxECD (ppg)
Tools
4.23 @
Current Pump & Flow Data:
DOYON15 Report For:
15225'7.4
Mud Type
FAZEPRO -
Ratio
Mud Data
Depth
69/39.25
Oil / Water
(lb/100ft2)
5326'
WOB
Smith XR+CPS Mill tooth
TFA Condition
1-1-WT-A-E-I-NO-BHA
16
RPM
51
6
15
Size
160' EVEMAR
Hycalog SKH616-E1D
Casing
Summary
L-80
Bit Type
RIH 5.5" Liner. Liner went thru window no problems. RIH w/5" DP & tag bottom at 15225'. Shoe at 15210'. Set at
Trip
5 5326' 70.00
100% Gas In Air=10,000 UnitsConnection
Average
Background
Mud (lb/bbl)ml/30min
3.252.50
(max)
C-3
9899'
Chromatograph (ppm)
Cement
C-1 C-5i
ShSiltst LstClyst
C-4i
Displacing To Brine
PV
cP
68.0
Weight
Flow In (gpm)
Flow In (spm)
Type
8.75 0.746
Footage
40.0
Depth in / out
5237'
8.75 5126'
15225'
2901'
Ss Cht Silt
100
Avg
to 0'
Current
0.0
MWD Summary
Time:
API FL
C-5n
Yesterday's Depth:
Current Depth:
24 Hour Progress:
SPP (psi)
15225'
15225'
0'
Lime
TuffGvl
1-1-CT-A-X-IN-NO-TD
96%
Date:
%
Alkal
Coal
Gallons/stroke
Minimum
Depth
13 3/8"
Maximum
in
Lithology (%)
4
Bit #
Depth
0'
0.746
16
C-2 C-4n
Gas Summary
(current)
Units*
907-685-0772Unit Phone:A.Paul Kalenuik
Set AtSize
178.9 X-65
Grade
159
40
Hours
3.20
Cly
HYDRIL
L-80
Comments
200'
Report By:
20.00''
9 5/8''
Logging Engineers:Paul Kalenuik/Jade Miller
(max)(current)
BTC
.
#.
*
24 hr Recap:
Report By:
20.00''
9 5/8''
Logging Engineers:Paul Kalenuik/Jade Miller
(max)(current)
BTC
159
40
Hours
3.20
Cly
HYDRIL
L-80
Comments
200'
907-685-0772Unit Phone:A.Paul Kalenuik
Set AtSize
178.9 X-65
Grade
Gas Summary
(current)
Units*C-2 C-4n
Depth
0'
0.746
Minimum
Depth
13 3/8"
Maximum
in
Lithology (%)
4
Bit #
%
Alkal
Coal
Gallons/stroke
15225'
15225'
0'
Lime
TuffGvl
1-1-CT-A-X-IN-NO-TD
96%
Date:
Time:
API FL
C-5n
Yesterday's Depth:
Current Depth:
24 Hour Progress:
SPP (psi)
Avg
to 0'
Current
0.0
MWD Summary
Ss Cht Silt
100
8.75 0.746
Footage
40.0
Depth in / out
5237'
8.75 5126'
15225'
2901'
Run Up Tbq Equip
PV
cP
68.0
Weight
Flow In (gpm)
Flow In (spm)
Type
Cement
C-1 C-5i
ShSiltst LstClyst
C-4i
9899'
Chromatograph (ppm)
Mud (lb/bbl)ml/30min
(max)
C-3
Average
Background 100% Gas In Air=10,000 UnitsConnection
Cleaned surface equip & pits of FazePro. PJSM. Cut & slip drill line. Service rig. L/D 5" DP f/4865' & running tool.
Trip
5 5326' 70.00 6
15
Size
160' EVEMAR
Hycalog SKH616-E1D
Casing
Summary
L-80
Bit Type
5326'
WOB
Smith XR+CPS Mill tooth
TFA Condition
1-1-WT-A-E-I-NO-BHA
RPM
27
Mud Type
FAZEPRO
Ratio
Mud Data
Depth
9.20
Oil / Water
(lb/100ft2)
4.23 @
Current Pump & Flow Data:
DOYON15 Report For:
15225'
Cor Solids
Avg Min
YP
MaxECD (ppg)
Tools
ENI PETROLEUM
SPY ISLAND
NORTH SLOPE
Job No.:
Daily Charges:
Total Charges:
Rig Activity:
Morning Report Report # 36
Customer:
Well:
Area:
Location:
Rig:
SP24-SE1
1-Apr-2014
12:00 AM
AK-AM-0901144926
ROP
ROP (ft/hr)
J.Keener/O. Amend
24 hr Max Max @ ft
Density (ppg)
out (sec/qt)
Viscosity
.
#.
*
24 hr Recap:
Density (ppg)
out (sec/qt)
Viscosity
12:00 AM
AK-AM-0901144926
ROP
ROP (ft/hr)
J.Keener/O. Amend
24 hr Max Max @ ft
Morning Report Report # 37
Customer:
Well:
Area:
Location:
Rig:
SP24-SE1
2-Apr-2014
ENI PETROLEUM
SPY ISLAND
NORTH SLOPE
Job No.:
Daily Charges:
Total Charges:
Rig Activity:
Cor Solids
Avg Min
YP
MaxECD (ppg)
Tools
4.23 @
Current Pump & Flow Data:
DOYON15 Report For:
15225'
Mud Type
FAZEPRO
Ratio
Mud Data
Depth
9.20
Oil / Water
(lb/100ft2)
5326'
WOB
Smith XR+CPS Mill tooth
TFA Condition
1-1-WT-A-E-I-NO-BHA
RPM
27
6
15
Size
160'EVEMAR
Hycalog SKH616-E1D
Casing
Summary
L-80
Bit Type
R/U wireline & set pump. RIH 4.5" comp. tbg to 195';splice at same depth. RIH tbg f/195' to 2017' C/O Cap tube
Trip
5 5326' 70.00
100% Gas In Air=10,000 UnitsConnection
Average
Background
Mud (lb/bbl)ml/30min
(max)
C-3
9899'
Chromatograph (ppm)
Cement
C-1 C-5i
ShSiltst LstClyst
C-4i
Run 4.5" Comp Tbg
PV
cP
68.0
Weight
Flow In (gpm)
Flow In (spm)
Type
8.75 0.746
Footage
40.0
Depth in / out
5237'
8.75 5126'
15225'
2901'
Ss Cht Silt
100
Avg
to 0'
Current
0.0
MWD Summary
Time:
API FL
C-5n
Yesterday's Depth:
Current Depth:
24 Hour Progress:
SPP (psi)
15225'
15225'
0'
Lime
TuffGvl
1-1-CT-A-X-IN-NO-TD
96%
Date:
%
Alkal
Coal
Gallons/stroke
Minimum
Depth
13 3/8"
Maximum
in
Lithology (%)
4
Bit #
Depth
0'
0.746
C-2 C-4n
Gas Summary
(current)
Units*
907-685-0772Unit Phone:A.Paul Kalenuik
Set AtSize
178.9 X-65
Grade
159
40
Hours
3.20
Cly
HYDRIL
L-80
Comments
200'
Report By:
20.00''
9 5/8''
Logging Engineers:Paul Kalenuik/Jade Miller
(max)(current)
BTC
WELL INFORMATION Created On : May 15 2014
Customer :ENI Petroleum
Well Name :SP24-SE1
Job Number :AK-XX-0901144926
Rig Name :Doyon 15
Country :USA
County :North Slope Borough
Survey Report
Survey dataSURVEY HEADER
Survey data provided by Schlumberger.
DIRECTIONAL SURVEY DATA
Tie-in
0.00 0.00 0.00 0.00 0.00 N 0.00 E
(ft)
Measured Depth DoglegVertical SectionDeparture
(ft)
Latitude
(ft)
Vertical Depth
(deg)
DirectionInclination
(deg)(ft)(ft)(°/100')
40.83 0.00 298.00 40.83 0.00 N 0.00 E 0.00 0.00
40.83 0.00 298.00 40.83 0.00 N 0.00 E 0.00 0.00
40.83 0.00 298.00 40.83 0.00 N 0.00 E 0.00 0.00
40.83 0.00 298.00 40.83 0.00 N 0.00 E 0.00 0.00
121.07 0.51 277.04 121.07 0.04 N 0.35 W 0.04 0.64
121.07 0.51 277.04 121.07 0.04 N 0.35 W 0.04 0.64
121.07 0.51 277.04 121.07 0.04 N 0.35 W 0.04 0.64
121.07 0.51 277.04 121.07 0.04 N 0.35 W 0.04 0.64
136.07 0.63 266.89 136.07 0.05 N 0.50 W 0.05 1.04
136.07 0.63 266.89 136.07 0.05 N 0.50 W 0.05 1.04
136.07 0.63 266.89 136.07 0.05 N 0.50 W 0.05 1.04
136.07 0.63 266.89 136.07 0.05 N 0.50 W 0.05 1.04
151.40 0.59 270.92 151.40 0.04 N 0.67 W 0.04 0.38
151.40 0.59 270.92 151.40 0.04 N 0.67 W 0.04 0.38
151.40 0.59 270.92 151.40 0.04 N 0.67 W 0.04 0.38
151.40 0.59 270.92 151.40 0.04 N 0.67 W 0.04 0.38
164.87 0.83 282.54 164.87 0.07 N 0.83 W 0.07 2.07
164.87 0.83 282.54 164.87 0.07 N 0.83 W 0.07 2.07
164.87 0.83 282.54 164.87 0.07 N 0.83 W 0.07 2.07
164.87 0.83 282.54 164.87 0.07 N 0.83 W 0.07 2.07
180.59 0.38 281.79 180.59 0.10 N 0.99 W 0.10 2.86
180.59 0.38 281.79 180.59 0.10 N 0.99 W 0.10 2.86
180.59 0.38 281.79 180.59 0.10 N 0.99 W 0.10 2.86
180.59 0.38 281.79 180.59 0.10 N 0.99 W 0.10 2.86
197.42 0.70 289.43 197.41 0.15 N 1.14 W 0.15 1.94
197.42 0.70 289.43 197.41 0.15 N 1.14 W 0.15 1.94
197.42 0.70 289.43 197.41 0.15 N 1.14 W 0.15 1.94
197.42 0.70 289.43 197.41 0.15 N 1.14 W 0.15 1.94
213.79 1.02 288.24 213.78 0.23 N 1.38 W 0.23 1.96
213.79 1.02 288.24 213.78 0.23 N 1.38 W 0.23 1.96
213.79 1.02 288.24 213.78 0.23 N 1.38 W 0.23 1.96
INSITE V8.0.20 Page 1Job No:AK-XX-0901144926 Well Name:SP24-SE1 Survey Report
DIRECTIONAL SURVEY DATA
(ft)
Measured Depth DoglegVertical SectionDeparture
(ft)
Latitude
(ft)
Vertical Depth
(deg)
DirectionInclination
(deg)(ft)(ft)(°/100')
213.79 1.02 288.24 213.78 0.23 N 1.38 W 0.23 1.96
229.76 0.85 283.87 229.75 0.30 N 1.63 W 0.30 1.15
229.76 0.85 283.87 229.75 0.30 N 1.63 W 0.30 1.15
229.76 0.85 283.87 229.75 0.30 N 1.63 W 0.30 1.15
229.76 0.85 283.87 229.75 0.30 N 1.63 W 0.30 1.15
244.94 0.95 283.28 244.93 0.36 N 1.86 W 0.36 0.66
244.94 0.95 283.28 244.93 0.36 N 1.86 W 0.36 0.66
244.94 0.95 283.28 244.93 0.36 N 1.86 W 0.36 0.66
244.94 0.95 283.28 244.93 0.36 N 1.86 W 0.36 0.66
257.49 1.07 289.61 257.48 0.42 N 2.07 W 0.42 1.30
257.49 1.07 289.61 257.48 0.42 N 2.07 W 0.42 1.30
257.49 1.07 289.61 257.48 0.42 N 2.07 W 0.42 1.30
257.49 1.07 289.61 257.48 0.42 N 2.07 W 0.42 1.30
275.31 1.41 298.37 275.29 0.58 N 2.42 W 0.58 2.18
275.31 1.41 298.37 275.29 0.58 N 2.42 W 0.58 2.18
275.31 1.41 298.37 275.29 0.58 N 2.42 W 0.58 2.18
275.31 1.41 298.37 275.29 0.58 N 2.42 W 0.58 2.18
292.67 1.84 302.32 292.65 0.83 N 2.84 W 0.83 2.56
292.67 1.84 302.32 292.65 0.83 N 2.84 W 0.83 2.56
292.67 1.84 302.32 292.65 0.83 N 2.84 W 0.83 2.56
292.67 1.84 302.32 292.65 0.83 N 2.84 W 0.83 2.56
307.96 2.28 302.69 307.93 1.12 N 3.31 W 1.12 2.88
307.96 2.28 302.69 307.93 1.12 N 3.31 W 1.12 2.88
307.96 2.28 302.69 307.93 1.12 N 3.31 W 1.12 2.88
307.96 2.28 302.69 307.93 1.12 N 3.31 W 1.12 2.88
323.39 2.71 296.96 323.34 1.46 N 3.89 W 1.46 3.22
323.39 2.71 296.96 323.34 1.46 N 3.89 W 1.46 3.22
323.39 2.71 296.96 323.34 1.46 N 3.89 W 1.46 3.22
323.39 2.71 296.96 323.34 1.46 N 3.89 W 1.46 3.22
337.07 3.18 296.73 337.00 1.77 N 4.52 W 1.77 3.44
337.07 3.18 296.73 337.00 1.77 N 4.52 W 1.77 3.44
337.07 3.18 296.73 337.00 1.77 N 4.52 W 1.77 3.44
337.07 3.18 296.73 337.00 1.77 N 4.52 W 1.77 3.44
350.17 3.45 296.22 350.08 2.11 N 5.20 W 2.11 2.07
350.17 3.45 296.22 350.08 2.11 N 5.20 W 2.11 2.07
350.17 3.45 296.22 350.08 2.11 N 5.20 W 2.11 2.07
350.17 3.45 296.22 350.08 2.11 N 5.20 W 2.11 2.07
364.76 3.77 296.79 364.64 2.52 N 6.02 W 2.52 2.21
364.76 3.77 296.79 364.64 2.52 N 6.02 W 2.52 2.21
364.76 3.77 296.79 364.64 2.52 N 6.02 W 2.52 2.21
364.76 3.77 296.79 364.64 2.52 N 6.02 W 2.52 2.21
376.91 4.09 295.93 376.76 2.89 N 6.76 W 2.89 2.68
376.91 4.09 295.93 376.76 2.89 N 6.76 W 2.89 2.68
376.91 4.09 295.93 376.76 2.89 N 6.76 W 2.89 2.68
376.91 4.09 295.93 376.76 2.89 N 6.76 W 2.89 2.68
INSITE V8.0.20 Page 2Job No:AK-XX-0901144926 Well Name:SP24-SE1 Survey Report
DIRECTIONAL SURVEY DATA
(ft)
Measured Depth DoglegVertical SectionDeparture
(ft)
Latitude
(ft)
Vertical Depth
(deg)
DirectionInclination
(deg)(ft)(ft)(°/100')
398.90 4.89 296.15 398.69 3.65 N 8.31 W 3.65 3.64
398.90 4.89 296.15 398.69 3.65 N 8.31 W 3.65 3.64
398.90 4.89 296.15 398.69 3.65 N 8.31 W 3.65 3.64
398.90 4.89 296.15 398.69 3.65 N 8.31 W 3.65 3.64
414.51 5.45 295.89 414.23 4.26 N 9.57 W 4.26 3.59
414.51 5.45 295.89 414.23 4.26 N 9.57 W 4.26 3.59
414.51 5.45 295.89 414.23 4.26 N 9.57 W 4.26 3.59
414.51 5.45 295.89 414.23 4.26 N 9.57 W 4.26 3.59
429.60 6.11 296.49 429.25 4.93 N 10.94 W 4.93 4.39
429.60 6.11 296.49 429.25 4.93 N 10.94 W 4.93 4.39
429.60 6.11 296.49 429.25 4.93 N 10.94 W 4.93 4.39
429.60 6.11 296.49 429.25 4.93 N 10.94 W 4.93 4.39
457.61 7.08 297.26 457.07 6.39 N 13.81 W 6.39 3.48
457.61 7.08 297.26 457.07 6.39 N 13.81 W 6.39 3.48
457.61 7.08 297.26 457.07 6.39 N 13.81 W 6.39 3.48
457.61 7.08 297.26 457.07 6.39 N 13.81 W 6.39 3.48
471.16 7.79 297.44 470.51 7.20 N 15.36 W 7.20 5.24
471.16 7.79 297.44 470.51 7.20 N 15.36 W 7.20 5.24
471.16 7.79 297.44 470.51 7.20 N 15.36 W 7.20 5.24
471.16 7.79 297.44 470.51 7.20 N 15.36 W 7.20 5.24
485.42 8.45 297.48 484.62 8.12 N 17.15 W 8.12 4.63
485.42 8.45 297.48 484.62 8.12 N 17.15 W 8.12 4.63
485.42 8.45 297.48 484.62 8.12 N 17.15 W 8.12 4.63
485.42 8.45 297.48 484.62 8.12 N 17.15 W 8.12 4.63
506.01 9.08 299.16 504.97 9.61 N 19.91 W 9.61 3.30
506.01 9.08 299.16 504.97 9.61 N 19.91 W 9.61 3.30
506.01 9.08 299.16 504.97 9.61 N 19.91 W 9.61 3.30
506.01 9.08 299.16 504.97 9.61 N 19.91 W 9.61 3.30
521.84 9.53 298.30 520.59 10.84 N 22.16 W 10.84 2.98
521.84 9.53 298.30 520.59 10.84 N 22.16 W 10.84 2.98
521.84 9.53 298.30 520.59 10.84 N 22.16 W 10.84 2.98
521.84 9.53 298.30 520.59 10.84 N 22.16 W 10.84 2.98
550.43 9.72 297.74 548.78 13.09 N 26.38 W 13.09 0.74
550.43 9.72 297.74 548.78 13.09 N 26.38 W 13.09 0.74
550.43 9.72 297.74 548.78 13.09 N 26.38 W 13.09 0.74
550.43 9.72 297.74 548.78 13.09 N 26.38 W 13.09 0.74
582.85 9.59 295.92 580.74 15.54 N 31.23 W 15.54 1.02
582.85 9.59 295.92 580.74 15.54 N 31.23 W 15.54 1.02
582.85 9.59 295.92 580.74 15.54 N 31.23 W 15.54 1.02
582.85 9.59 295.92 580.74 15.54 N 31.23 W 15.54 1.02
613.81 10.61 294.61 611.22 17.86 N 36.14 W 17.86 3.38
613.81 10.61 294.61 611.22 17.86 N 36.14 W 17.86 3.38
613.81 10.61 294.61 611.22 17.86 N 36.14 W 17.86 3.38
613.81 10.61 294.61 611.22 17.86 N 36.14 W 17.86 3.38
642.51 11.85 293.67 639.37 20.14 N 41.24 W 20.14 4.37
INSITE V8.0.20 Page 3Job No:AK-XX-0901144926 Well Name:SP24-SE1 Survey Report
DIRECTIONAL SURVEY DATA
(ft)
Measured Depth DoglegVertical SectionDeparture
(ft)
Latitude
(ft)
Vertical Depth
(deg)
DirectionInclination
(deg)(ft)(ft)(°/100')
642.51 11.85 293.67 639.37 20.14 N 41.24 W 20.14 4.37
642.51 11.85 293.67 639.37 20.14 N 41.24 W 20.14 4.37
642.51 11.85 293.67 639.37 20.14 N 41.24 W 20.14 4.37
674.82 13.82 293.25 670.87 23.00 N 47.82 W 23.00 6.10
674.82 13.82 293.25 670.87 23.00 N 47.82 W 23.00 6.10
674.82 13.82 293.25 670.87 23.00 N 47.82 W 23.00 6.10
674.82 13.82 293.25 670.87 23.00 N 47.82 W 23.00 6.10
705.61 14.90 293.10 700.70 26.00 N 54.85 W 26.00 3.51
705.61 14.90 293.10 700.70 26.00 N 54.85 W 26.00 3.51
705.61 14.90 293.10 700.70 26.00 N 54.85 W 26.00 3.51
705.61 14.90 293.10 700.70 26.00 N 54.85 W 26.00 3.51
705.61 14.90 293.10 700.70 26.00 N 54.85 W 26.00 3.51
735.83 16.15 293.42 729.82 29.20 N 62.28 W 29.20 4.15
735.83 16.15 293.42 729.82 29.20 N 62.28 W 29.20 4.15
735.83 16.15 293.42 729.82 29.20 N 62.28 W 29.20 4.15
735.83 16.15 293.42 729.82 29.20 N 62.28 W 29.20 4.15
735.83 16.15 293.42 729.82 29.20 N 62.28 W 29.20 4.15
767.69 17.79 293.30 760.29 32.88 N 70.81 W 32.88 5.15
767.69 17.79 293.30 760.29 32.88 N 70.81 W 32.88 5.15
767.69 17.79 293.30 760.29 32.88 N 70.81 W 32.88 5.15
767.69 17.79 293.30 760.29 32.88 N 70.81 W 32.88 5.15
767.69 17.79 293.30 760.29 32.88 N 70.81 W 32.88 5.15
800.04 19.02 294.23 790.98 37.00 N 80.16 W 37.00 3.91
800.04 19.02 294.23 790.98 37.00 N 80.16 W 37.00 3.91
800.04 19.02 294.23 790.98 37.00 N 80.16 W 37.00 3.91
800.04 19.02 294.23 790.98 37.00 N 80.16 W 37.00 3.91
800.04 19.02 294.23 790.98 37.00 N 80.16 W 37.00 3.91
829.35 20.18 294.22 818.60 41.04 N 89.12 W 41.04 3.96
829.35 20.18 294.22 818.60 41.04 N 89.12 W 41.04 3.96
829.35 20.18 294.22 818.60 41.04 N 89.12 W 41.04 3.96
829.35 20.18 294.22 818.60 41.04 N 89.12 W 41.04 3.96
829.35 20.18 294.22 818.60 41.04 N 89.12 W 41.04 3.96
861.70 21.26 294.01 848.85 45.71 N 99.57 W 45.71 3.35
861.70 21.26 294.01 848.85 45.71 N 99.57 W 45.71 3.35
861.70 21.26 294.01 848.85 45.71 N 99.57 W 45.71 3.35
861.70 21.26 294.01 848.85 45.71 N 99.57 W 45.71 3.35
861.70 21.26 294.01 848.85 45.71 N 99.57 W 45.71 3.35
893.15 22.87 295.19 878.00 50.63 N 110.31 W 50.63 5.31
893.15 22.87 295.19 878.00 50.63 N 110.31 W 50.63 5.31
893.15 22.87 295.19 878.00 50.63 N 110.31 W 50.63 5.31
893.15 22.87 295.19 878.00 50.63 N 110.31 W 50.63 5.31
893.15 22.87 295.19 878.00 50.63 N 110.31 W 50.63 5.31
922.79 24.14 295.69 905.18 55.71 N 120.99 W 55.71 4.34
922.79 24.14 295.69 905.18 55.71 N 120.99 W 55.71 4.34
922.79 24.14 295.69 905.18 55.71 N 120.99 W 55.71 4.34
INSITE V8.0.20 Page 4Job No:AK-XX-0901144926 Well Name:SP24-SE1 Survey Report
DIRECTIONAL SURVEY DATA
(ft)
Measured Depth DoglegVertical SectionDeparture
(ft)
Latitude
(ft)
Vertical Depth
(deg)
DirectionInclination
(deg)(ft)(ft)(°/100')
922.79 24.14 295.69 905.18 55.71 N 120.99 W 55.71 4.34
922.79 24.14 295.69 905.18 55.71 N 120.99 W 55.71 4.34
955.39 25.31 295.38 934.79 61.59 N 133.29 W 61.59 3.61
955.39 25.31 295.38 934.79 61.59 N 133.29 W 61.59 3.61
955.39 25.31 295.38 934.79 61.59 N 133.29 W 61.59 3.61
955.39 25.31 295.38 934.79 61.59 N 133.29 W 61.59 3.61
955.39 25.31 295.38 934.79 61.59 N 133.29 W 61.59 3.61
986.14 27.04 295.40 962.38 67.40 N 145.54 W 67.40 5.63
986.14 27.04 295.40 962.38 67.40 N 145.54 W 67.40 5.63
986.14 27.04 295.40 962.38 67.40 N 145.54 W 67.40 5.63
986.14 27.04 295.40 962.38 67.40 N 145.54 W 67.40 5.63
986.14 27.04 295.40 962.38 67.40 N 145.54 W 67.40 5.63
1016.21 28.53 296.25 988.99 73.51 N 158.16 W 73.51 5.13
1016.21 28.53 296.25 988.99 73.51 N 158.16 W 73.51 5.13
1016.21 28.53 296.25 988.99 73.51 N 158.16 W 73.51 5.13
1016.21 28.53 296.25 988.99 73.51 N 158.16 W 73.51 5.13
1016.21 28.53 296.25 988.99 73.51 N 158.16 W 73.51 5.13
1050.30 29.79 296.35 1,018.76 80.87 N 173.05 W 80.87 3.70
1050.30 29.79 296.35 1,018.76 80.87 N 173.05 W 80.87 3.70
1050.30 29.79 296.35 1,018.76 80.87 N 173.05 W 80.87 3.70
1050.30 29.79 296.35 1,018.76 80.87 N 173.05 W 80.87 3.70
1050.30 29.79 296.35 1,018.76 80.87 N 173.05 W 80.87 3.70
1081.31 30.65 296.68 1,045.55 87.84 N 187.01 W 87.84 2.82
1081.31 30.65 296.68 1,045.55 87.84 N 187.01 W 87.84 2.82
1081.31 30.65 296.68 1,045.55 87.84 N 187.01 W 87.84 2.82
1081.31 30.65 296.68 1,045.55 87.84 N 187.01 W 87.84 2.82
1081.31 30.65 296.68 1,045.55 87.84 N 187.01 W 87.84 2.82
1109.64 31.62 297.59 1,069.80 94.52 N 200.05 W 94.52 3.81
1109.64 31.62 297.59 1,069.80 94.52 N 200.05 W 94.52 3.81
1109.64 31.62 297.59 1,069.80 94.52 N 200.05 W 94.52 3.81
1109.64 31.62 297.59 1,069.80 94.52 N 200.05 W 94.52 3.81
1109.64 31.62 297.59 1,069.80 94.52 N 200.05 W 94.52 3.81
1144.09 33.12 298.15 1,098.90 103.15 N 216.35 W 103.15 4.44
1144.09 33.12 298.15 1,098.90 103.15 N 216.35 W 103.15 4.44
1144.09 33.12 298.15 1,098.90 103.15 N 216.35 W 103.15 4.44
1144.09 33.12 298.15 1,098.90 103.15 N 216.35 W 103.15 4.44
1144.09 33.12 298.15 1,098.90 103.15 N 216.35 W 103.15 4.44
1175.22 33.11 299.10 1,124.97 111.29 N 231.28 W 111.29 1.67
1175.22 33.11 299.10 1,124.97 111.29 N 231.28 W 111.29 1.67
1175.22 33.11 299.10 1,124.97 111.29 N 231.28 W 111.29 1.67
1175.22 33.11 299.10 1,124.97 111.29 N 231.28 W 111.29 1.67
1175.22 33.11 299.10 1,124.97 111.29 N 231.28 W 111.29 1.67
1203.10 33.76 299.02 1,148.24 118.75 N 244.71 W 118.75 2.34
1203.10 33.76 299.02 1,148.24 118.75 N 244.71 W 118.75 2.34
1203.10 33.76 299.02 1,148.24 118.75 N 244.71 W 118.75 2.34
INSITE V8.0.20 Page 5Job No:AK-XX-0901144926 Well Name:SP24-SE1 Survey Report
DIRECTIONAL SURVEY DATA
(ft)
Measured Depth DoglegVertical SectionDeparture
(ft)
Latitude
(ft)
Vertical Depth
(deg)
DirectionInclination
(deg)(ft)(ft)(°/100')
1203.10 33.76 299.02 1,148.24 118.75 N 244.71 W 118.75 2.34
1203.10 33.76 299.02 1,148.24 118.75 N 244.71 W 118.75 2.34
1236.20 34.88 298.78 1,175.57 127.77 N 261.05 W 127.77 3.41
1236.20 34.88 298.78 1,175.57 127.77 N 261.05 W 127.77 3.41
1236.20 34.88 298.78 1,175.57 127.77 N 261.05 W 127.77 3.41
1236.20 34.88 298.78 1,175.57 127.77 N 261.05 W 127.77 3.41
1236.20 34.88 298.78 1,175.57 127.77 N 261.05 W 127.77 3.41
1267.76 35.73 299.14 1,201.33 136.61 N 277.00 W 136.61 2.77
1267.76 35.73 299.14 1,201.33 136.61 N 277.00 W 136.61 2.77
1267.76 35.73 299.14 1,201.33 136.61 N 277.00 W 136.61 2.77
1267.76 35.73 299.14 1,201.33 136.61 N 277.00 W 136.61 2.77
1267.76 35.73 299.14 1,201.33 136.61 N 277.00 W 136.61 2.77
1296.51 36.89 299.36 1,224.50 144.92 N 291.86 W 144.92 4.06
1296.51 36.89 299.36 1,224.50 144.92 N 291.86 W 144.92 4.06
1296.51 36.89 299.36 1,224.50 144.92 N 291.86 W 144.92 4.06
1296.51 36.89 299.36 1,224.50 144.92 N 291.86 W 144.92 4.06
1296.51 36.89 299.36 1,224.50 144.92 N 291.86 W 144.92 4.06
1329.19 38.90 299.30 1,250.28 154.76 N 309.36 W 154.76 6.15
1329.19 38.90 299.30 1,250.28 154.76 N 309.36 W 154.76 6.15
1329.19 38.90 299.30 1,250.28 154.76 N 309.36 W 154.76 6.15
1329.19 38.90 299.30 1,250.28 154.76 N 309.36 W 154.76 6.15
1329.19 38.90 299.30 1,250.28 154.76 N 309.36 W 154.76 6.15
1360.04 39.78 299.00 1,274.14 164.28 N 326.44 W 164.28 2.92
1360.04 39.78 299.00 1,274.14 164.28 N 326.44 W 164.28 2.92
1360.04 39.78 299.00 1,274.14 164.28 N 326.44 W 164.28 2.92
1360.04 39.78 299.00 1,274.14 164.28 N 326.44 W 164.28 2.92
1360.04 39.78 299.00 1,274.14 164.28 N 326.44 W 164.28 2.92
1389.89 39.65 299.49 1,297.10 173.60 N 343.08 W 173.60 1.14
1389.89 39.65 299.49 1,297.10 173.60 N 343.08 W 173.60 1.14
1389.89 39.65 299.49 1,297.10 173.60 N 343.08 W 173.60 1.14
1389.89 39.65 299.49 1,297.10 173.60 N 343.08 W 173.60 1.14
1389.89 39.65 299.49 1,297.10 173.60 N 343.08 W 173.60 1.14
1422.02 40.96 298.74 1,321.61 183.71 N 361.24 W 183.71 4.35
1422.02 40.96 298.74 1,321.61 183.71 N 361.24 W 183.71 4.35
1422.02 40.96 298.74 1,321.61 183.71 N 361.24 W 183.71 4.35
1422.02 40.96 298.74 1,321.61 183.71 N 361.24 W 183.71 4.35
1452.13 41.62 298.41 1,344.23 193.21 N 378.68 W 193.21 2.31
1452.13 41.62 298.41 1,344.23 193.21 N 378.68 W 193.21 2.31
1452.13 41.62 298.41 1,344.23 193.21 N 378.68 W 193.21 2.31
1452.13 41.62 298.41 1,344.23 193.21 N 378.68 W 193.21 2.31
1483.26 41.13 297.67 1,367.59 202.89 N 396.84 W 202.89 2.22
1483.26 41.13 297.67 1,367.59 202.89 N 396.84 W 202.89 2.22
1483.26 41.13 297.67 1,367.59 202.89 N 396.84 W 202.89 2.22
1483.26 41.13 297.67 1,367.59 202.89 N 396.84 W 202.89 2.22
1514.91 40.78 297.64 1,391.49 212.51 N 415.22 W 212.51 1.11
INSITE V8.0.20 Page 6Job No:AK-XX-0901144926 Well Name:SP24-SE1 Survey Report
DIRECTIONAL SURVEY DATA
(ft)
Measured Depth DoglegVertical SectionDeparture
(ft)
Latitude
(ft)
Vertical Depth
(deg)
DirectionInclination
(deg)(ft)(ft)(°/100')
1514.91 40.78 297.64 1,391.49 212.51 N 415.22 W 212.51 1.11
1514.91 40.78 297.64 1,391.49 212.51 N 415.22 W 212.51 1.11
1514.91 40.78 297.64 1,391.49 212.51 N 415.22 W 212.51 1.11
1545.50 40.84 297.89 1,414.65 221.83 N 432.91 W 221.83 0.57
1545.50 40.84 297.89 1,414.65 221.83 N 432.91 W 221.83 0.57
1545.50 40.84 297.89 1,414.65 221.83 N 432.91 W 221.83 0.57
1545.50 40.84 297.89 1,414.65 221.83 N 432.91 W 221.83 0.57
1576.70 40.31 297.17 1,438.35 231.21 N 450.91 W 231.21 2.27
1576.70 40.31 297.17 1,438.35 231.21 N 450.91 W 231.21 2.27
1576.70 40.31 297.17 1,438.35 231.21 N 450.91 W 231.21 2.27
1576.70 40.31 297.17 1,438.35 231.21 N 450.91 W 231.21 2.27
1608.89 40.13 296.14 1,462.92 240.53 N 469.48 W 240.53 2.14
1608.89 40.13 296.14 1,462.92 240.53 N 469.48 W 240.53 2.14
1608.89 40.13 296.14 1,462.92 240.53 N 469.48 W 240.53 2.14
1608.89 40.13 296.14 1,462.92 240.53 N 469.48 W 240.53 2.14
1640.33 40.54 296.28 1,486.89 249.52 N 487.74 W 249.52 1.34
1640.33 40.54 296.28 1,486.89 249.52 N 487.74 W 249.52 1.34
1640.33 40.54 296.28 1,486.89 249.52 N 487.74 W 249.52 1.34
1640.33 40.54 296.28 1,486.89 249.52 N 487.74 W 249.52 1.34
1670.18 41.49 295.66 1,509.41 258.10 N 505.35 W 258.10 3.46
1670.18 41.49 295.66 1,509.41 258.10 N 505.35 W 258.10 3.46
1670.18 41.49 295.66 1,509.41 258.10 N 505.35 W 258.10 3.46
1670.18 41.49 295.66 1,509.41 258.10 N 505.35 W 258.10 3.46
1702.71 42.78 295.52 1,533.54 267.52 N 525.03 W 267.52 3.98
1702.71 42.78 295.52 1,533.54 267.52 N 525.03 W 267.52 3.98
1702.71 42.78 295.52 1,533.54 267.52 N 525.03 W 267.52 3.98
1702.71 42.78 295.52 1,533.54 267.52 N 525.03 W 267.52 3.98
1733.69 42.45 296.49 1,556.33 276.72 N 543.88 W 276.72 2.37
1733.69 42.45 296.49 1,556.33 276.72 N 543.88 W 276.72 2.37
1733.69 42.45 296.49 1,556.33 276.72 N 543.88 W 276.72 2.37
1733.69 42.45 296.49 1,556.33 276.72 N 543.88 W 276.72 2.37
1763.52 42.09 296.53 1,578.41 285.68 N 561.84 W 285.68 1.21
1763.52 42.09 296.53 1,578.41 285.68 N 561.84 W 285.68 1.21
1763.52 42.09 296.53 1,578.41 285.68 N 561.84 W 285.68 1.21
1763.52 42.09 296.53 1,578.41 285.68 N 561.84 W 285.68 1.21
1795.95 42.72 296.91 1,602.35 295.51 N 581.37 W 295.51 2.10
1795.95 42.72 296.91 1,602.35 295.51 N 581.37 W 295.51 2.10
1795.95 42.72 296.91 1,602.35 295.51 N 581.37 W 295.51 2.10
1795.95 42.72 296.91 1,602.35 295.51 N 581.37 W 295.51 2.10
1826.66 43.25 297.08 1,624.82 305.01 N 600.03 W 305.01 1.77
1826.66 43.25 297.08 1,624.82 305.01 N 600.03 W 305.01 1.77
1826.66 43.25 297.08 1,624.82 305.01 N 600.03 W 305.01 1.77
1826.66 43.25 297.08 1,624.82 305.01 N 600.03 W 305.01 1.77
1857.01 43.36 297.17 1,646.91 314.50 N 618.56 W 314.50 0.42
1857.01 43.36 297.17 1,646.91 314.50 N 618.56 W 314.50 0.42
INSITE V8.0.20 Page 7Job No:AK-XX-0901144926 Well Name:SP24-SE1 Survey Report
DIRECTIONAL SURVEY DATA
(ft)
Measured Depth DoglegVertical SectionDeparture
(ft)
Latitude
(ft)
Vertical Depth
(deg)
DirectionInclination
(deg)(ft)(ft)(°/100')
1857.01 43.36 297.17 1,646.91 314.50 N 618.56 W 314.50 0.42
1857.01 43.36 297.17 1,646.91 314.50 N 618.56 W 314.50 0.42
1888.71 43.25 297.05 1,669.97 324.41 N 637.91 W 324.41 0.43
1888.71 43.25 297.05 1,669.97 324.41 N 637.91 W 324.41 0.43
1888.71 43.25 297.05 1,669.97 324.41 N 637.91 W 324.41 0.43
1888.71 43.25 297.05 1,669.97 324.41 N 637.91 W 324.41 0.43
1920.62 43.98 297.19 1,693.08 334.45 N 657.50 W 334.45 2.31
1920.62 43.98 297.19 1,693.08 334.45 N 657.50 W 334.45 2.31
1920.62 43.98 297.19 1,693.08 334.45 N 657.50 W 334.45 2.31
1920.62 43.98 297.19 1,693.08 334.45 N 657.50 W 334.45 2.31
1949.32 44.72 296.86 1,713.60 343.56 N 675.37 W 343.56 2.70
1949.32 44.72 296.86 1,713.60 343.56 N 675.37 W 343.56 2.70
1949.32 44.72 296.86 1,713.60 343.56 N 675.37 W 343.56 2.70
1949.32 44.72 296.86 1,713.60 343.56 N 675.37 W 343.56 2.70
1949.32 44.72 296.86 1,713.60 343.56 N 675.37 W 343.56 2.70
1983.10 45.22 296.73 1,737.50 354.32 N 696.68 W 354.32 1.50
1983.10 45.22 296.73 1,737.50 354.32 N 696.68 W 354.32 1.50
1983.10 45.22 296.73 1,737.50 354.32 N 696.68 W 354.32 1.50
1983.10 45.22 296.73 1,737.50 354.32 N 696.68 W 354.32 1.50
2014.35 45.29 297.07 1,759.50 364.37 N 716.48 W 364.37 0.80
2014.35 45.29 297.07 1,759.50 364.37 N 716.48 W 364.37 0.80
2014.35 45.29 297.07 1,759.50 364.37 N 716.48 W 364.37 0.80
2014.35 45.29 297.07 1,759.50 364.37 N 716.48 W 364.37 0.80
2044.25 44.56 296.46 1,780.67 373.87 N 735.33 W 373.88 2.83
2044.25 44.56 296.46 1,780.67 373.87 N 735.33 W 373.88 2.83
2044.25 44.56 296.46 1,780.67 373.87 N 735.33 W 373.88 2.83
2044.25 44.56 296.46 1,780.67 373.87 N 735.33 W 373.88 2.83
2078.78 46.02 295.98 1,804.96 384.72 N 757.34 W 384.72 4.34
2078.78 46.02 295.98 1,804.96 384.72 N 757.34 W 384.72 4.34
2078.78 46.02 295.98 1,804.96 384.72 N 757.34 W 384.72 4.34
2078.78 46.02 295.98 1,804.96 384.72 N 757.34 W 384.72 4.34
2110.11 46.69 295.96 1,826.58 394.64 N 777.73 W 394.64 2.14
2110.11 46.69 295.96 1,826.58 394.64 N 777.73 W 394.64 2.14
2110.11 46.69 295.96 1,826.58 394.64 N 777.73 W 394.64 2.14
2110.11 46.69 295.96 1,826.58 394.64 N 777.73 W 394.64 2.14
2136.55 46.75 296.15 1,844.71 403.10 N 795.02 W 403.10 0.57
2136.55 46.75 296.15 1,844.71 403.10 N 795.02 W 403.10 0.57
2136.55 46.75 296.15 1,844.71 403.10 N 795.02 W 403.10 0.57
2136.55 46.75 296.15 1,844.71 403.10 N 795.02 W 403.10 0.57
2170.91 46.11 294.01 1,868.39 413.65 N 817.56 W 413.65 4.88
2170.91 46.11 294.01 1,868.39 413.65 N 817.56 W 413.65 4.88
2170.91 46.11 294.01 1,868.39 413.65 N 817.56 W 413.65 4.88
2170.91 46.11 294.01 1,868.39 413.65 N 817.56 W 413.65 4.88
2202.22 45.18 291.43 1,890.28 422.30 N 838.21 W 422.30 6.60
2202.22 45.18 291.43 1,890.28 422.30 N 838.21 W 422.30 6.60
INSITE V8.0.20 Page 8Job No:AK-XX-0901144926 Well Name:SP24-SE1 Survey Report
DIRECTIONAL SURVEY DATA
(ft)
Measured Depth DoglegVertical SectionDeparture
(ft)
Latitude
(ft)
Vertical Depth
(deg)
DirectionInclination
(deg)(ft)(ft)(°/100')
2230.13 44.13 290.81 1,910.14 429.37 N 856.51 W 429.37 4.07
2262.03 43.21 289.81 1,933.21 437.02 N 877.16 W 437.02 3.61
2294.29 42.53 287.46 1,956.86 444.03 N 897.95 W 444.03 5.39
2323.44 41.50 286.22 1,978.51 449.68 N 916.63 W 449.68 4.54
2380.86 39.91 284.83 2,022.04 459.71 N 952.70 W 459.71 3.19
2474.26 37.29 280.33 2,095.04 472.46 N 1,009.52 W 472.46 4.11
2567.54 35.43 273.46 2,170.19 479.16 N 1,064.34 W 479.16 4.80
2660.91 34.10 267.82 2,246.91 479.80 N 1,117.52 W 479.80 3.73
2754.32 32.32 261.94 2,325.08 475.30 N 1,168.43 W 475.30 3.94
2833.94 31.34 257.95 2,392.74 467.99 N 1,209.76 W 467.99 2.91
3009.06 28.86 242.30 2,544.47 438.79 N 1,291.86 W 438.79 4.69
3102.34 27.90 232.25 2,626.58 414.95 N 1,329.07 W 414.95 5.22
3195.69 24.76 225.33 2,710.26 387.82 N 1,360.25 W 387.82 4.70
3289.38 25.86 216.72 2,794.98 357.64 N 1,386.43 W 357.64 4.10
3382.44 28.84 207.88 2,877.66 321.51 N 1,409.08 W 321.51 5.41
3475.86 28.66 198.25 2,959.61 280.30 N 1,426.64 W 280.30 4.96
3569.30 29.72 188.82 3,041.23 236.10 N 1,437.21 W 236.10 5.05
3662.64 30.86 179.39 3,121.87 189.27 N 1,440.51 W 189.27 5.23
3756.00 33.30 172.10 3,201.00 139.92 N 1,436.73 W 139.92 4.90
3849.45 37.30 167.49 3,277.27 86.84 N 1,427.06 W 86.84 5.14
3942.84 42.42 165.09 3,348.93 28.73 N 1,412.82 W 28.73 5.72
4036.28 47.32 163.60 3,415.14 34.71 S 1,395.00 W -34.71 5.36
4129.70 50.93 159.78 3,476.27 101.72 S 1,372.76 W -101.72 4.95
4223.13 53.92 155.71 3,533.26 170.20 S 1,344.68 W -170.20 4.71
4316.56 56.82 151.72 3,586.36 239.08 S 1,310.61 W -239.08 4.69
4410.00 59.13 148.52 3,635.92 307.73 S 1,271.13 W -307.73 3.81
4503.38 63.84 146.61 3,680.49 376.95 S 1,227.11 W -376.95 5.35
4596.75 66.33 144.99 3,719.82 446.97 S 1,179.51 W -446.97 3.10
4690.19 69.95 142.30 3,754.61 516.77 S 1,128.10 W -516.77 4.71
4783.67 71.37 141.63 3,785.57 586.24 S 1,073.75 W -586.24 1.66
4877.01 71.38 140.62 3,815.38 655.10 S 1,018.24 W -655.10 1.03
4970.07 71.28 137.47 3,845.18 721.68 S 960.46 W -721.68 3.21
5063.42 74.54 134.41 3,872.61 785.77 S 898.41 W -785.77 4.69
5156.79 74.91 133.31 3,897.21 848.17 S 833.47 W -848.17 1.20
5181.65 75.67 133.34 3,903.52 864.67 S 815.97 W -864.67 3.06
5263.00 79.21 132.38 3,921.21 918.67 S 757.78 W -918.67 4.50
5644.98 85.28 126.43 3,972.78 1,158.60 S 465.51 W -1158.60 2.21
5738.41 87.04 127.41 3,979.03 1,214.59 S 390.99 W -1214.59 2.15
5831.90 89.71 128.48 3,981.68 1,272.05 S 317.30 W -1272.05 3.08
5925.44 89.66 128.14 3,982.20 1,330.04 S 243.90 W -1330.04 0.37
6018.48 89.86 126.11 3,982.59 1,386.19 S 169.72 W -1386.19 2.19
6111.83 88.24 124.68 3,984.14 1,440.25 S 93.64 W -1440.25 2.31
6205.30 87.40 124.03 3,987.69 1,492.96 S 16.53 W -1492.96 1.14
6299.06 86.84 124.39 3,992.40 1,545.60 S 60.90 E -1545.61 0.71
6392.24 86.98 124.71 3,997.42 1,598.37 S 137.54 E -1598.37 0.37
INSITE V8.0.20 Page 9Job No:AK-XX-0901144926 Well Name:SP24-SE1 Survey Report
DIRECTIONAL SURVEY DATA
(ft)
Measured Depth DoglegVertical SectionDeparture
(ft)
Latitude
(ft)
Vertical Depth
(deg)
DirectionInclination
(deg)(ft)(ft)(°/100')
6485.28 90.36 125.73 3,999.58 1,652.01 S 213.51 E -1652.01 3.79
6578.71 92.29 124.63 3,997.42 1,705.82 S 289.85 E -1705.82 2.38
6672.10 92.48 122.42 3,993.54 1,757.35 S 367.64 E -1757.35 2.37
6765.51 92.24 121.65 3,989.69 1,806.86 S 446.75 E -1806.86 0.86
6859.71 90.96 120.67 3,987.06 1,855.58 S 527.33 E -1855.58 1.71
6952.31 87.12 121.78 3,988.61 1,903.56 S 606.49 E -1903.57 4.32
7045.61 86.78 124.60 3,993.58 1,954.56 S 684.45 E -1954.56 3.04
7139.54 88.32 125.69 3,997.59 2,008.58 S 761.18 E -2008.58 2.01
7232.36 88.96 125.13 3,999.79 2,062.35 S 836.81 E -2062.35 0.92
7325.66 89.22 125.63 4,001.28 2,116.36 S 912.87 E -2116.36 0.60
7419.02 90.17 126.84 4,001.77 2,171.54 S 988.17 E -2171.54 1.65
7512.40 90.23 127.56 4,001.45 2,228.00 S 1,062.55 E -2228.00 0.77
7605.80 89.47 127.96 4,001.69 2,285.19 S 1,136.39 E -2285.19 0.92
7699.26 90.51 129.41 4,001.71 2,343.61 S 1,209.34 E -2343.61 1.91
7792.59 91.04 130.11 4,000.45 2,403.29 S 1,281.08 E -2403.29 0.94
7885.96 87.36 128.90 4,001.75 2,462.67 S 1,353.10 E -2462.67 4.15
7979.36 86.71 127.56 4,006.58 2,520.39 S 1,426.37 E -2520.39 1.59
8072.68 88.75 127.71 4,010.28 2,577.33 S 1,500.21 E -2577.33 2.19
8165.92 89.84 127.97 4,011.42 2,634.52 S 1,573.84 E -2634.52 1.20
8259.33 89.64 127.89 4,011.85 2,691.94 S 1,647.51 E -2691.94 0.23
8353.78 89.24 127.04 4,012.77 2,749.39 S 1,722.48 E -2749.39 0.99
8446.11 89.56 125.65 4,013.74 2,804.10 S 1,796.84 E -2804.10 1.54
8540.06 89.63 124.44 4,014.40 2,858.05 S 1,873.75 E -2858.05 1.29
8631.47 88.79 123.07 4,015.66 2,908.83 S 1,949.74 E -2908.83 1.76
8725.01 88.48 122.53 4,017.89 2,959.49 S 2,028.35 E -2959.49 0.67
8819.50 88.61 122.97 4,020.29 3,010.59 S 2,107.79 E -3010.59 0.49
8912.89 88.43 124.12 4,022.70 3,062.18 S 2,185.60 E -3062.18 1.25
9006.16 90.82 127.50 4,023.31 3,116.74 S 2,261.22 E -3116.74 4.44
9100.05 88.99 125.62 4,023.47 3,172.66 S 2,336.63 E -3172.66 2.79
9192.87 87.91 123.63 4,025.98 3,225.38 S 2,412.98 E -3225.38 2.44
9286.17 91.11 124.78 4,026.78 3,277.82 S 2,490.12 E -3277.82 3.64
9379.56 91.35 125.69 4,024.77 3,331.68 S 2,566.39 E -3331.68 1.01
9473.73 92.67 124.99 4,021.47 3,386.12 S 2,643.15 E -3386.12 1.59
9567.62 90.63 124.79 4,018.77 3,439.80 S 2,720.13 E -3439.80 2.18
9660.30 89.72 125.16 4,018.48 3,492.92 S 2,796.07 E -3492.92 1.06
9753.11 89.75 125.32 4,018.91 3,546.47 S 2,871.87 E -3546.47 0.18
9846.48 89.79 124.48 4,019.29 3,599.89 S 2,948.45 E -3599.90 0.90
9939.84 88.41 124.97 4,020.75 3,653.07 S 3,025.17 E -3653.07 1.57
10033.33 87.85 125.84 4,023.81 3,707.20 S 3,101.33 E -3707.20 1.11
10126.69 86.56 126.58 4,028.36 3,762.29 S 3,176.57 E -3762.29 1.59
10220.01 85.91 126.31 4,034.49 3,817.60 S 3,251.47 E -3817.60 0.75
10314.28 87.92 127.10 4,039.56 3,873.86 S 3,326.94 E -3873.86 2.29
10406.85 87.72 128.24 4,043.08 3,930.39 S 3,400.16 E -3930.39 1.25
10500.16 88.78 128.70 4,045.93 3,988.41 S 3,473.18 E -3988.41 1.24
10593.63 88.84 128.05 4,047.87 4,046.43 S 3,546.44 E -4046.43 0.70
INSITE V8.0.20 Page 10Job No:AK-XX-0901144926 Well Name:SP24-SE1 Survey Report
DIRECTIONAL SURVEY DATA
(ft)
Measured Depth DoglegVertical SectionDeparture
(ft)
Latitude
(ft)
Vertical Depth
(deg)
DirectionInclination
(deg)(ft)(ft)(°/100')
10686.97 88.79 126.78 4,049.80 4,103.13 S 3,620.56 E -4103.13 1.36
10780.32 88.09 126.66 4,052.34 4,158.92 S 3,695.35 E -4158.92 0.76
10873.70 88.42 127.22 4,055.19 4,215.01 S 3,769.95 E -4215.01 0.70
10967.06 88.05 126.08 4,058.06 4,270.71 S 3,844.82 E -4270.71 1.28
11060.41 90.72 127.09 4,059.06 4,326.34 S 3,919.77 E -4326.34 3.06
11153.88 91.29 125.78 4,057.42 4,381.85 S 3,994.95 E -4381.85 1.53
11247.16 91.97 125.48 4,054.77 4,436.16 S 4,070.74 E -4436.16 0.80
11340.55 93.12 124.57 4,050.62 4,489.71 S 4,147.14 E -4489.71 1.57
11433.99 92.14 123.95 4,046.34 4,542.25 S 4,224.28 E -4542.25 1.24
11527.15 89.44 123.38 4,045.05 4,593.89 S 4,301.80 E -4593.89 2.96
11621.09 89.88 122.93 4,045.61 4,645.26 S 4,380.45 E -4645.26 0.67
11714.17 89.47 122.72 4,046.14 4,695.72 S 4,458.66 E -4695.72 0.49
11807.50 89.82 122.60 4,046.72 4,746.08 S 4,537.24 E -4746.08 0.40
11900.87 89.65 124.00 4,047.15 4,797.34 S 4,615.27 E -4797.34 1.51
11994.25 91.13 124.47 4,046.51 4,849.87 S 4,692.47 E -4849.87 1.66
12087.57 91.27 125.98 4,044.56 4,903.69 S 4,768.68 E -4903.69 1.62
12181.19 90.12 126.08 4,043.42 4,958.75 S 4,844.39 E -4958.75 1.23
12274.22 90.26 127.54 4,043.11 5,014.49 S 4,918.87 E -5014.49 1.58
12367.50 89.53 126.86 4,043.28 5,070.88 S 4,993.17 E -5070.88 1.07
12460.88 92.13 128.10 4,041.93 5,127.69 S 5,067.25 E -5127.69 3.08
12554.21 92.26 125.90 4,038.36 5,183.81 S 5,141.73 E -5183.81 2.36
12647.60 91.58 125.19 4,035.23 5,238.07 S 5,217.68 E -5238.08 1.05
12741.02 92.04 125.67 4,032.28 5,292.20 S 5,293.76 E -5292.20 0.71
12834.46 92.26 126.31 4,028.77 5,347.07 S 5,369.31 E -5347.07 0.72
12927.80 90.35 126.07 4,026.65 5,402.17 S 5,444.62 E -5402.17 2.06
13021.16 90.43 127.54 4,026.01 5,458.10 S 5,519.36 E -5458.10 1.58
13114.61 89.61 128.17 4,025.98 5,515.45 S 5,593.15 E -5515.45 1.11
13208.00 89.54 127.09 4,026.67 5,572.46 S 5,667.11 E -5572.46 1.16
13301.44 90.69 125.90 4,026.48 5,628.04 S 5,742.22 E -5628.04 1.77
13394.86 90.69 124.87 4,025.36 5,682.13 S 5,818.38 E -5682.13 1.10
13488.29 90.75 123.86 4,024.18 5,734.86 S 5,895.49 E -5734.86 1.08
13581.72 91.95 123.87 4,021.98 5,786.91 S 5,973.05 E -5786.91 1.28
13675.16 92.15 124.54 4,018.64 5,839.40 S 6,050.28 E -5839.40 0.75
13768.54 92.46 125.49 4,014.89 5,892.94 S 6,126.69 E -5892.94 1.07
13861.91 91.05 124.97 4,012.03 5,946.77 S 6,202.93 E -5946.77 1.61
13955.35 87.98 125.65 4,012.82 6,000.77 S 6,279.16 E -6000.77 3.37
14048.83 87.91 125.64 4,016.17 6,055.21 S 6,355.08 E -6055.21 0.08
14142.17 89.45 125.82 4,018.32 6,109.70 S 6,430.83 E -6109.70 1.66
14235.23 87.50 126.68 4,020.80 6,164.71 S 6,505.85 E -6164.71 2.29
14328.58 87.32 126.26 4,025.01 6,220.14 S 6,580.84 E -6220.14 0.49
14421.95 89.52 126.95 4,027.59 6,275.79 S 6,655.76 E -6275.79 2.47
14515.40 85.40 126.06 4,031.73 6,331.32 S 6,730.78 E -6331.32 4.51
14608.78 87.93 127.01 4,037.16 6,386.81 S 6,805.68 E -6386.81 2.89
14702.09 88.84 127.20 4,039.79 6,443.08 S 6,880.07 E -6443.08 1.00
14795.52 88.65 126.29 4,041.84 6,498.96 S 6,954.91 E -6498.96 0.99
INSITE V8.0.20 Page 11Job No:AK-XX-0901144926 Well Name:SP24-SE1 Survey Report
DIRECTIONAL SURVEY DATA
(ft)
Measured Depth DoglegVertical SectionDeparture
(ft)
Latitude
(ft)
Vertical Depth
(deg)
DirectionInclination
(deg)(ft)(ft)(°/100')
14888.92 91.35 126.65 4,041.84 6,554.47 S 7,030.02 E -6554.47 2.92
14982.20 91.92 125.87 4,039.18 6,609.62 S 7,105.20 E -6609.62 1.04
15075.57 91.64 125.86 4,036.28 6,664.29 S 7,180.83 E -6664.30 0.30
15169.52 92.11 126.00 4,033.20 6,719.39 S 7,256.86 E -6719.40 0.52
15240.00 92.11 126.00 4,030.61 6,760.79 S 7,313.84 E -6760.79 0.00
DIRECTIONAL SURVEY DATA NOTES
- Calculation based on minimum curvature method.
- Survey coordinates relative to well system reference point.
- TVD values given relative to drilling measurement point.
- Vertical section relative to well head.
- Vertical section is computed along a direction of 0.00 degrees (Grid)
- A total correction of 0.00 deg from Magnetic north to Grid north has been applied
- Horizontal displacement is relative to the well head.
- Horizontal displacement (closure) at 15,240.00 feet is 9,959.95 feet along 132.75 degrees (Grid)
WARRANTY
HALLIBURTON ENERGY SERVICES, INC. WILL USE ITS BEST EFFORTS TO FURNISH CUSTOMERS WITH ACCURATE INFORMATION
AND INTERPRETATIONS THAT ARE PART OF, AND INCIDENT TO, THE SERVICES PROVIDED. HOWEVER, HALLIBURTON ENERGY
SERVICES, INC. CANNOT AND DOES NOT WARRANT THE ACCURACY OR CORRECTNESS OF SUCH INFORMATION AND
INTERPRETATIONS. UNDER NO CIRCUMSTANCES SHOULD ANY SUCH INFORMATION OR INTERPRETATION BE RELIED UPON AS
THE SOLE BASIS FOR ANY DRILLING, COMPLETION, PRODUCTION, OR FINANCIAL DECISION OR ANY PROCEDURE INVOLVING ANY
RISK TO THE SAFETY OF ANY DRILLING VENTURE, DRILLING RIG OR ITS CREW OR ANY THIRD PARTY. THE CUSTOMER HAS FULL
RESPONSIBILITY FOR ALL DRILLING, COMPLETION, AND PRODUCTION OPERATION. HALLIBURTON ENERGY SERVICES, INC.
MAKES NO REPRESENTATIONS OR WARRANTIES, EITHER EXPRESSED OR IMPLIED, INCLUDING, BUT NOT LIMITED TO, THE
IMPLIED WARRANTIES OF MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE, WITH RESPECT TO THE SERVICES
RENDERED. IN NO EVENT WILL HALLIBURTON ENERGY SERVICES, INC. SERVICES BE LIABLE FOR FAILURE TO OBTAIN ANY
PARTICULAR RESULTS OR FOR ANY DAMAGES, INCLUDING, BUT NOT LIMITED TO, INDIRECT, SPECIAL OR CONSEQUENTIAL
DAMAGES, RESULTING FROM THE USE OF ANY INFORMATION OR INTERPRETATION PROVIDED BY HALLIBURTON ENERGY
SERVICES, INC.
INSITE V8.0.20 Page 12Job No:AK-XX-0901144926 Well Name:SP24-SE1 Survey Report
WELL INFORMATION Created On : May 15 2014
Customer :ENI Petroleum
Well Name :SP24-SE1 L1
Job Number :AK-XX-0901144926
Rig Name :Doyon 15
Country :USA
County :North Slope Borough
Survey Report
Survey dataSURVEY HEADER
Survey data provided by Schlumberger.
DIRECTIONAL SURVEY DATA
Tie-in
0.00 0.00 0.00 0.00 0.00 N 0.00 E
(ft)
Measured Depth DoglegVertical SectionDeparture
(ft)
Latitude
(ft)
Vertical Depth
(deg)
DirectionInclination
(deg)(ft)(ft)(°/100')
40.83 0.00 298.00 40.83 0.00 N 0.00 E 0.00 0.00
40.83 0.00 298.00 40.83 0.00 N 0.00 E 0.00 0.00
40.83 0.00 298.00 40.83 0.00 N 0.00 E 0.00 0.00
40.83 0.00 298.00 40.83 0.00 N 0.00 E 0.00 0.00
121.07 0.51 277.04 121.07 0.04 N 0.35 W 0.04 0.64
121.07 0.51 277.04 121.07 0.04 N 0.35 W 0.04 0.64
121.07 0.51 277.04 121.07 0.04 N 0.35 W 0.04 0.64
121.07 0.51 277.04 121.07 0.04 N 0.35 W 0.04 0.64
136.07 0.63 266.89 136.07 0.05 N 0.50 W 0.05 1.04
136.07 0.63 266.89 136.07 0.05 N 0.50 W 0.05 1.04
136.07 0.63 266.89 136.07 0.05 N 0.50 W 0.05 1.04
136.07 0.63 266.89 136.07 0.05 N 0.50 W 0.05 1.04
151.40 0.59 270.92 151.40 0.04 N 0.67 W 0.04 0.38
151.40 0.59 270.92 151.40 0.04 N 0.67 W 0.04 0.38
151.40 0.59 270.92 151.40 0.04 N 0.67 W 0.04 0.38
151.40 0.59 270.92 151.40 0.04 N 0.67 W 0.04 0.38
164.87 0.83 282.54 164.87 0.07 N 0.83 W 0.07 2.07
164.87 0.83 282.54 164.87 0.07 N 0.83 W 0.07 2.07
164.87 0.83 282.54 164.87 0.07 N 0.83 W 0.07 2.07
164.87 0.83 282.54 164.87 0.07 N 0.83 W 0.07 2.07
180.59 0.38 281.79 180.59 0.10 N 0.99 W 0.10 2.86
180.59 0.38 281.79 180.59 0.10 N 0.99 W 0.10 2.86
180.59 0.38 281.79 180.59 0.10 N 0.99 W 0.10 2.86
180.59 0.38 281.79 180.59 0.10 N 0.99 W 0.10 2.86
197.42 0.70 289.43 197.41 0.15 N 1.14 W 0.15 1.94
197.42 0.70 289.43 197.41 0.15 N 1.14 W 0.15 1.94
197.42 0.70 289.43 197.41 0.15 N 1.14 W 0.15 1.94
197.42 0.70 289.43 197.41 0.15 N 1.14 W 0.15 1.94
213.79 1.02 288.24 213.78 0.23 N 1.38 W 0.23 1.96
213.79 1.02 288.24 213.78 0.23 N 1.38 W 0.23 1.96
213.79 1.02 288.24 213.78 0.23 N 1.38 W 0.23 1.96
INSITE V8.0.20 Page 1Job No:AK-XX-0901144926 Well Name:SP24-SE1 L1 Survey Report
DIRECTIONAL SURVEY DATA
(ft)
Measured Depth DoglegVertical SectionDeparture
(ft)
Latitude
(ft)
Vertical Depth
(deg)
DirectionInclination
(deg)(ft)(ft)(°/100')
213.79 1.02 288.24 213.78 0.23 N 1.38 W 0.23 1.96
229.76 0.85 283.87 229.75 0.30 N 1.63 W 0.30 1.15
229.76 0.85 283.87 229.75 0.30 N 1.63 W 0.30 1.15
229.76 0.85 283.87 229.75 0.30 N 1.63 W 0.30 1.15
229.76 0.85 283.87 229.75 0.30 N 1.63 W 0.30 1.15
244.94 0.95 283.28 244.93 0.36 N 1.86 W 0.36 0.66
244.94 0.95 283.28 244.93 0.36 N 1.86 W 0.36 0.66
244.94 0.95 283.28 244.93 0.36 N 1.86 W 0.36 0.66
244.94 0.95 283.28 244.93 0.36 N 1.86 W 0.36 0.66
257.49 1.07 289.61 257.48 0.42 N 2.07 W 0.42 1.30
257.49 1.07 289.61 257.48 0.42 N 2.07 W 0.42 1.30
257.49 1.07 289.61 257.48 0.42 N 2.07 W 0.42 1.30
257.49 1.07 289.61 257.48 0.42 N 2.07 W 0.42 1.30
275.31 1.41 298.37 275.29 0.58 N 2.42 W 0.58 2.18
275.31 1.41 298.37 275.29 0.58 N 2.42 W 0.58 2.18
275.31 1.41 298.37 275.29 0.58 N 2.42 W 0.58 2.18
275.31 1.41 298.37 275.29 0.58 N 2.42 W 0.58 2.18
292.67 1.84 302.32 292.65 0.83 N 2.84 W 0.83 2.56
292.67 1.84 302.32 292.65 0.83 N 2.84 W 0.83 2.56
292.67 1.84 302.32 292.65 0.83 N 2.84 W 0.83 2.56
292.67 1.84 302.32 292.65 0.83 N 2.84 W 0.83 2.56
307.96 2.28 302.69 307.93 1.12 N 3.31 W 1.12 2.88
307.96 2.28 302.69 307.93 1.12 N 3.31 W 1.12 2.88
307.96 2.28 302.69 307.93 1.12 N 3.31 W 1.12 2.88
307.96 2.28 302.69 307.93 1.12 N 3.31 W 1.12 2.88
323.39 2.71 296.96 323.34 1.46 N 3.89 W 1.46 3.22
323.39 2.71 296.96 323.34 1.46 N 3.89 W 1.46 3.22
323.39 2.71 296.96 323.34 1.46 N 3.89 W 1.46 3.22
323.39 2.71 296.96 323.34 1.46 N 3.89 W 1.46 3.22
337.07 3.18 296.73 337.00 1.77 N 4.52 W 1.77 3.44
337.07 3.18 296.73 337.00 1.77 N 4.52 W 1.77 3.44
337.07 3.18 296.73 337.00 1.77 N 4.52 W 1.77 3.44
337.07 3.18 296.73 337.00 1.77 N 4.52 W 1.77 3.44
350.17 3.45 296.22 350.08 2.11 N 5.20 W 2.11 2.07
350.17 3.45 296.22 350.08 2.11 N 5.20 W 2.11 2.07
350.17 3.45 296.22 350.08 2.11 N 5.20 W 2.11 2.07
350.17 3.45 296.22 350.08 2.11 N 5.20 W 2.11 2.07
364.76 3.77 296.79 364.64 2.52 N 6.02 W 2.52 2.21
364.76 3.77 296.79 364.64 2.52 N 6.02 W 2.52 2.21
364.76 3.77 296.79 364.64 2.52 N 6.02 W 2.52 2.21
364.76 3.77 296.79 364.64 2.52 N 6.02 W 2.52 2.21
376.91 4.09 295.93 376.76 2.89 N 6.76 W 2.89 2.68
376.91 4.09 295.93 376.76 2.89 N 6.76 W 2.89 2.68
376.91 4.09 295.93 376.76 2.89 N 6.76 W 2.89 2.68
376.91 4.09 295.93 376.76 2.89 N 6.76 W 2.89 2.68
INSITE V8.0.20 Page 2Job No:AK-XX-0901144926 Well Name:SP24-SE1 L1 Survey Report
DIRECTIONAL SURVEY DATA
(ft)
Measured Depth DoglegVertical SectionDeparture
(ft)
Latitude
(ft)
Vertical Depth
(deg)
DirectionInclination
(deg)(ft)(ft)(°/100')
398.90 4.89 296.15 398.69 3.65 N 8.31 W 3.65 3.64
398.90 4.89 296.15 398.69 3.65 N 8.31 W 3.65 3.64
398.90 4.89 296.15 398.69 3.65 N 8.31 W 3.65 3.64
398.90 4.89 296.15 398.69 3.65 N 8.31 W 3.65 3.64
414.51 5.45 295.89 414.23 4.26 N 9.57 W 4.26 3.59
414.51 5.45 295.89 414.23 4.26 N 9.57 W 4.26 3.59
414.51 5.45 295.89 414.23 4.26 N 9.57 W 4.26 3.59
414.51 5.45 295.89 414.23 4.26 N 9.57 W 4.26 3.59
429.60 6.11 296.49 429.25 4.93 N 10.94 W 4.93 4.39
429.60 6.11 296.49 429.25 4.93 N 10.94 W 4.93 4.39
429.60 6.11 296.49 429.25 4.93 N 10.94 W 4.93 4.39
429.60 6.11 296.49 429.25 4.93 N 10.94 W 4.93 4.39
457.61 7.08 297.26 457.07 6.39 N 13.81 W 6.39 3.48
457.61 7.08 297.26 457.07 6.39 N 13.81 W 6.39 3.48
457.61 7.08 297.26 457.07 6.39 N 13.81 W 6.39 3.48
457.61 7.08 297.26 457.07 6.39 N 13.81 W 6.39 3.48
471.16 7.79 297.44 470.51 7.20 N 15.36 W 7.20 5.24
471.16 7.79 297.44 470.51 7.20 N 15.36 W 7.20 5.24
471.16 7.79 297.44 470.51 7.20 N 15.36 W 7.20 5.24
471.16 7.79 297.44 470.51 7.20 N 15.36 W 7.20 5.24
485.42 8.45 297.48 484.62 8.12 N 17.15 W 8.12 4.63
485.42 8.45 297.48 484.62 8.12 N 17.15 W 8.12 4.63
485.42 8.45 297.48 484.62 8.12 N 17.15 W 8.12 4.63
485.42 8.45 297.48 484.62 8.12 N 17.15 W 8.12 4.63
506.01 9.08 299.16 504.97 9.61 N 19.91 W 9.61 3.30
506.01 9.08 299.16 504.97 9.61 N 19.91 W 9.61 3.30
506.01 9.08 299.16 504.97 9.61 N 19.91 W 9.61 3.30
506.01 9.08 299.16 504.97 9.61 N 19.91 W 9.61 3.30
521.84 9.53 298.30 520.59 10.84 N 22.16 W 10.84 2.98
521.84 9.53 298.30 520.59 10.84 N 22.16 W 10.84 2.98
521.84 9.53 298.30 520.59 10.84 N 22.16 W 10.84 2.98
521.84 9.53 298.30 520.59 10.84 N 22.16 W 10.84 2.98
550.43 9.72 297.74 548.78 13.09 N 26.38 W 13.09 0.74
550.43 9.72 297.74 548.78 13.09 N 26.38 W 13.09 0.74
550.43 9.72 297.74 548.78 13.09 N 26.38 W 13.09 0.74
550.43 9.72 297.74 548.78 13.09 N 26.38 W 13.09 0.74
582.85 9.59 295.92 580.74 15.54 N 31.23 W 15.54 1.02
582.85 9.59 295.92 580.74 15.54 N 31.23 W 15.54 1.02
582.85 9.59 295.92 580.74 15.54 N 31.23 W 15.54 1.02
582.85 9.59 295.92 580.74 15.54 N 31.23 W 15.54 1.02
613.81 10.61 294.61 611.22 17.86 N 36.14 W 17.86 3.38
613.81 10.61 294.61 611.22 17.86 N 36.14 W 17.86 3.38
613.81 10.61 294.61 611.22 17.86 N 36.14 W 17.86 3.38
613.81 10.61 294.61 611.22 17.86 N 36.14 W 17.86 3.38
642.51 11.85 293.67 639.37 20.14 N 41.24 W 20.14 4.37
INSITE V8.0.20 Page 3Job No:AK-XX-0901144926 Well Name:SP24-SE1 L1 Survey Report
DIRECTIONAL SURVEY DATA
(ft)
Measured Depth DoglegVertical SectionDeparture
(ft)
Latitude
(ft)
Vertical Depth
(deg)
DirectionInclination
(deg)(ft)(ft)(°/100')
642.51 11.85 293.67 639.37 20.14 N 41.24 W 20.14 4.37
642.51 11.85 293.67 639.37 20.14 N 41.24 W 20.14 4.37
642.51 11.85 293.67 639.37 20.14 N 41.24 W 20.14 4.37
674.82 13.82 293.25 670.87 23.00 N 47.82 W 23.00 6.10
674.82 13.82 293.25 670.87 23.00 N 47.82 W 23.00 6.10
674.82 13.82 293.25 670.87 23.00 N 47.82 W 23.00 6.10
674.82 13.82 293.25 670.87 23.00 N 47.82 W 23.00 6.10
705.61 14.90 293.10 700.70 26.00 N 54.85 W 26.00 3.51
705.61 14.90 293.10 700.70 26.00 N 54.85 W 26.00 3.51
705.61 14.90 293.10 700.70 26.00 N 54.85 W 26.00 3.51
705.61 14.90 293.10 700.70 26.00 N 54.85 W 26.00 3.51
705.61 14.90 293.10 700.70 26.00 N 54.85 W 26.00 3.51
735.83 16.15 293.42 729.82 29.20 N 62.28 W 29.20 4.15
735.83 16.15 293.42 729.82 29.20 N 62.28 W 29.20 4.15
735.83 16.15 293.42 729.82 29.20 N 62.28 W 29.20 4.15
735.83 16.15 293.42 729.82 29.20 N 62.28 W 29.20 4.15
735.83 16.15 293.42 729.82 29.20 N 62.28 W 29.20 4.15
767.69 17.79 293.30 760.29 32.88 N 70.81 W 32.88 5.15
767.69 17.79 293.30 760.29 32.88 N 70.81 W 32.88 5.15
767.69 17.79 293.30 760.29 32.88 N 70.81 W 32.88 5.15
767.69 17.79 293.30 760.29 32.88 N 70.81 W 32.88 5.15
767.69 17.79 293.30 760.29 32.88 N 70.81 W 32.88 5.15
800.04 19.02 294.23 790.98 37.00 N 80.16 W 37.00 3.91
800.04 19.02 294.23 790.98 37.00 N 80.16 W 37.00 3.91
800.04 19.02 294.23 790.98 37.00 N 80.16 W 37.00 3.91
800.04 19.02 294.23 790.98 37.00 N 80.16 W 37.00 3.91
800.04 19.02 294.23 790.98 37.00 N 80.16 W 37.00 3.91
829.35 20.18 294.22 818.60 41.04 N 89.12 W 41.04 3.96
829.35 20.18 294.22 818.60 41.04 N 89.12 W 41.04 3.96
829.35 20.18 294.22 818.60 41.04 N 89.12 W 41.04 3.96
829.35 20.18 294.22 818.60 41.04 N 89.12 W 41.04 3.96
829.35 20.18 294.22 818.60 41.04 N 89.12 W 41.04 3.96
861.70 21.26 294.01 848.85 45.71 N 99.57 W 45.71 3.35
861.70 21.26 294.01 848.85 45.71 N 99.57 W 45.71 3.35
861.70 21.26 294.01 848.85 45.71 N 99.57 W 45.71 3.35
861.70 21.26 294.01 848.85 45.71 N 99.57 W 45.71 3.35
861.70 21.26 294.01 848.85 45.71 N 99.57 W 45.71 3.35
893.15 22.87 295.19 878.00 50.63 N 110.31 W 50.63 5.31
893.15 22.87 295.19 878.00 50.63 N 110.31 W 50.63 5.31
893.15 22.87 295.19 878.00 50.63 N 110.31 W 50.63 5.31
893.15 22.87 295.19 878.00 50.63 N 110.31 W 50.63 5.31
893.15 22.87 295.19 878.00 50.63 N 110.31 W 50.63 5.31
922.79 24.14 295.69 905.18 55.71 N 120.99 W 55.71 4.34
922.79 24.14 295.69 905.18 55.71 N 120.99 W 55.71 4.34
922.79 24.14 295.69 905.18 55.71 N 120.99 W 55.71 4.34
INSITE V8.0.20 Page 4Job No:AK-XX-0901144926 Well Name:SP24-SE1 L1 Survey Report
DIRECTIONAL SURVEY DATA
(ft)
Measured Depth DoglegVertical SectionDeparture
(ft)
Latitude
(ft)
Vertical Depth
(deg)
DirectionInclination
(deg)(ft)(ft)(°/100')
922.79 24.14 295.69 905.18 55.71 N 120.99 W 55.71 4.34
922.79 24.14 295.69 905.18 55.71 N 120.99 W 55.71 4.34
955.39 25.31 295.38 934.79 61.59 N 133.29 W 61.59 3.61
955.39 25.31 295.38 934.79 61.59 N 133.29 W 61.59 3.61
955.39 25.31 295.38 934.79 61.59 N 133.29 W 61.59 3.61
955.39 25.31 295.38 934.79 61.59 N 133.29 W 61.59 3.61
955.39 25.31 295.38 934.79 61.59 N 133.29 W 61.59 3.61
986.14 27.04 295.40 962.38 67.40 N 145.54 W 67.40 5.63
986.14 27.04 295.40 962.38 67.40 N 145.54 W 67.40 5.63
986.14 27.04 295.40 962.38 67.40 N 145.54 W 67.40 5.63
986.14 27.04 295.40 962.38 67.40 N 145.54 W 67.40 5.63
986.14 27.04 295.40 962.38 67.40 N 145.54 W 67.40 5.63
1016.21 28.53 296.25 988.99 73.51 N 158.16 W 73.51 5.13
1016.21 28.53 296.25 988.99 73.51 N 158.16 W 73.51 5.13
1016.21 28.53 296.25 988.99 73.51 N 158.16 W 73.51 5.13
1016.21 28.53 296.25 988.99 73.51 N 158.16 W 73.51 5.13
1016.21 28.53 296.25 988.99 73.51 N 158.16 W 73.51 5.13
1050.30 29.79 296.35 1,018.76 80.87 N 173.05 W 80.87 3.70
1050.30 29.79 296.35 1,018.76 80.87 N 173.05 W 80.87 3.70
1050.30 29.79 296.35 1,018.76 80.87 N 173.05 W 80.87 3.70
1050.30 29.79 296.35 1,018.76 80.87 N 173.05 W 80.87 3.70
1050.30 29.79 296.35 1,018.76 80.87 N 173.05 W 80.87 3.70
1081.31 30.65 296.68 1,045.55 87.84 N 187.01 W 87.84 2.82
1081.31 30.65 296.68 1,045.55 87.84 N 187.01 W 87.84 2.82
1081.31 30.65 296.68 1,045.55 87.84 N 187.01 W 87.84 2.82
1081.31 30.65 296.68 1,045.55 87.84 N 187.01 W 87.84 2.82
1081.31 30.65 296.68 1,045.55 87.84 N 187.01 W 87.84 2.82
1109.64 31.62 297.59 1,069.80 94.52 N 200.05 W 94.52 3.81
1109.64 31.62 297.59 1,069.80 94.52 N 200.05 W 94.52 3.81
1109.64 31.62 297.59 1,069.80 94.52 N 200.05 W 94.52 3.81
1109.64 31.62 297.59 1,069.80 94.52 N 200.05 W 94.52 3.81
1109.64 31.62 297.59 1,069.80 94.52 N 200.05 W 94.52 3.81
1144.09 33.12 298.15 1,098.90 103.15 N 216.35 W 103.15 4.44
1144.09 33.12 298.15 1,098.90 103.15 N 216.35 W 103.15 4.44
1144.09 33.12 298.15 1,098.90 103.15 N 216.35 W 103.15 4.44
1144.09 33.12 298.15 1,098.90 103.15 N 216.35 W 103.15 4.44
1144.09 33.12 298.15 1,098.90 103.15 N 216.35 W 103.15 4.44
1175.22 33.11 299.10 1,124.97 111.29 N 231.28 W 111.29 1.67
1175.22 33.11 299.10 1,124.97 111.29 N 231.28 W 111.29 1.67
1175.22 33.11 299.10 1,124.97 111.29 N 231.28 W 111.29 1.67
1175.22 33.11 299.10 1,124.97 111.29 N 231.28 W 111.29 1.67
1175.22 33.11 299.10 1,124.97 111.29 N 231.28 W 111.29 1.67
1203.10 33.76 299.02 1,148.24 118.75 N 244.71 W 118.75 2.34
1203.10 33.76 299.02 1,148.24 118.75 N 244.71 W 118.75 2.34
1203.10 33.76 299.02 1,148.24 118.75 N 244.71 W 118.75 2.34
INSITE V8.0.20 Page 5Job No:AK-XX-0901144926 Well Name:SP24-SE1 L1 Survey Report
DIRECTIONAL SURVEY DATA
(ft)
Measured Depth DoglegVertical SectionDeparture
(ft)
Latitude
(ft)
Vertical Depth
(deg)
DirectionInclination
(deg)(ft)(ft)(°/100')
1203.10 33.76 299.02 1,148.24 118.75 N 244.71 W 118.75 2.34
1203.10 33.76 299.02 1,148.24 118.75 N 244.71 W 118.75 2.34
1236.20 34.88 298.78 1,175.57 127.77 N 261.05 W 127.77 3.41
1236.20 34.88 298.78 1,175.57 127.77 N 261.05 W 127.77 3.41
1236.20 34.88 298.78 1,175.57 127.77 N 261.05 W 127.77 3.41
1236.20 34.88 298.78 1,175.57 127.77 N 261.05 W 127.77 3.41
1236.20 34.88 298.78 1,175.57 127.77 N 261.05 W 127.77 3.41
1267.76 35.73 299.14 1,201.33 136.61 N 277.00 W 136.61 2.77
1267.76 35.73 299.14 1,201.33 136.61 N 277.00 W 136.61 2.77
1267.76 35.73 299.14 1,201.33 136.61 N 277.00 W 136.61 2.77
1267.76 35.73 299.14 1,201.33 136.61 N 277.00 W 136.61 2.77
1267.76 35.73 299.14 1,201.33 136.61 N 277.00 W 136.61 2.77
1296.51 36.89 299.36 1,224.50 144.92 N 291.86 W 144.92 4.06
1296.51 36.89 299.36 1,224.50 144.92 N 291.86 W 144.92 4.06
1296.51 36.89 299.36 1,224.50 144.92 N 291.86 W 144.92 4.06
1296.51 36.89 299.36 1,224.50 144.92 N 291.86 W 144.92 4.06
1296.51 36.89 299.36 1,224.50 144.92 N 291.86 W 144.92 4.06
1329.19 38.90 299.30 1,250.28 154.76 N 309.36 W 154.76 6.15
1329.19 38.90 299.30 1,250.28 154.76 N 309.36 W 154.76 6.15
1329.19 38.90 299.30 1,250.28 154.76 N 309.36 W 154.76 6.15
1329.19 38.90 299.30 1,250.28 154.76 N 309.36 W 154.76 6.15
1329.19 38.90 299.30 1,250.28 154.76 N 309.36 W 154.76 6.15
1360.04 39.78 299.00 1,274.14 164.28 N 326.44 W 164.28 2.92
1360.04 39.78 299.00 1,274.14 164.28 N 326.44 W 164.28 2.92
1360.04 39.78 299.00 1,274.14 164.28 N 326.44 W 164.28 2.92
1360.04 39.78 299.00 1,274.14 164.28 N 326.44 W 164.28 2.92
1360.04 39.78 299.00 1,274.14 164.28 N 326.44 W 164.28 2.92
1389.89 39.65 299.49 1,297.10 173.60 N 343.08 W 173.60 1.14
1389.89 39.65 299.49 1,297.10 173.60 N 343.08 W 173.60 1.14
1389.89 39.65 299.49 1,297.10 173.60 N 343.08 W 173.60 1.14
1389.89 39.65 299.49 1,297.10 173.60 N 343.08 W 173.60 1.14
1389.89 39.65 299.49 1,297.10 173.60 N 343.08 W 173.60 1.14
1422.02 40.96 298.74 1,321.61 183.71 N 361.24 W 183.71 4.35
1422.02 40.96 298.74 1,321.61 183.71 N 361.24 W 183.71 4.35
1422.02 40.96 298.74 1,321.61 183.71 N 361.24 W 183.71 4.35
1422.02 40.96 298.74 1,321.61 183.71 N 361.24 W 183.71 4.35
1452.13 41.62 298.41 1,344.23 193.21 N 378.68 W 193.21 2.31
1452.13 41.62 298.41 1,344.23 193.21 N 378.68 W 193.21 2.31
1452.13 41.62 298.41 1,344.23 193.21 N 378.68 W 193.21 2.31
1452.13 41.62 298.41 1,344.23 193.21 N 378.68 W 193.21 2.31
1483.26 41.13 297.67 1,367.59 202.89 N 396.84 W 202.89 2.22
1483.26 41.13 297.67 1,367.59 202.89 N 396.84 W 202.89 2.22
1483.26 41.13 297.67 1,367.59 202.89 N 396.84 W 202.89 2.22
1483.26 41.13 297.67 1,367.59 202.89 N 396.84 W 202.89 2.22
1514.91 40.78 297.64 1,391.49 212.51 N 415.22 W 212.51 1.11
INSITE V8.0.20 Page 6Job No:AK-XX-0901144926 Well Name:SP24-SE1 L1 Survey Report
DIRECTIONAL SURVEY DATA
(ft)
Measured Depth DoglegVertical SectionDeparture
(ft)
Latitude
(ft)
Vertical Depth
(deg)
DirectionInclination
(deg)(ft)(ft)(°/100')
1514.91 40.78 297.64 1,391.49 212.51 N 415.22 W 212.51 1.11
1514.91 40.78 297.64 1,391.49 212.51 N 415.22 W 212.51 1.11
1514.91 40.78 297.64 1,391.49 212.51 N 415.22 W 212.51 1.11
1545.50 40.84 297.89 1,414.65 221.83 N 432.91 W 221.83 0.57
1545.50 40.84 297.89 1,414.65 221.83 N 432.91 W 221.83 0.57
1545.50 40.84 297.89 1,414.65 221.83 N 432.91 W 221.83 0.57
1545.50 40.84 297.89 1,414.65 221.83 N 432.91 W 221.83 0.57
1576.70 40.31 297.17 1,438.35 231.21 N 450.91 W 231.21 2.27
1576.70 40.31 297.17 1,438.35 231.21 N 450.91 W 231.21 2.27
1576.70 40.31 297.17 1,438.35 231.21 N 450.91 W 231.21 2.27
1576.70 40.31 297.17 1,438.35 231.21 N 450.91 W 231.21 2.27
1608.89 40.13 296.14 1,462.92 240.53 N 469.48 W 240.53 2.14
1608.89 40.13 296.14 1,462.92 240.53 N 469.48 W 240.53 2.14
1608.89 40.13 296.14 1,462.92 240.53 N 469.48 W 240.53 2.14
1608.89 40.13 296.14 1,462.92 240.53 N 469.48 W 240.53 2.14
1640.33 40.54 296.28 1,486.89 249.52 N 487.74 W 249.52 1.34
1640.33 40.54 296.28 1,486.89 249.52 N 487.74 W 249.52 1.34
1640.33 40.54 296.28 1,486.89 249.52 N 487.74 W 249.52 1.34
1640.33 40.54 296.28 1,486.89 249.52 N 487.74 W 249.52 1.34
1670.18 41.49 295.66 1,509.41 258.10 N 505.35 W 258.10 3.46
1670.18 41.49 295.66 1,509.41 258.10 N 505.35 W 258.10 3.46
1670.18 41.49 295.66 1,509.41 258.10 N 505.35 W 258.10 3.46
1670.18 41.49 295.66 1,509.41 258.10 N 505.35 W 258.10 3.46
1702.71 42.78 295.52 1,533.54 267.52 N 525.03 W 267.52 3.98
1702.71 42.78 295.52 1,533.54 267.52 N 525.03 W 267.52 3.98
1702.71 42.78 295.52 1,533.54 267.52 N 525.03 W 267.52 3.98
1702.71 42.78 295.52 1,533.54 267.52 N 525.03 W 267.52 3.98
1733.69 42.45 296.49 1,556.33 276.72 N 543.88 W 276.72 2.37
1733.69 42.45 296.49 1,556.33 276.72 N 543.88 W 276.72 2.37
1733.69 42.45 296.49 1,556.33 276.72 N 543.88 W 276.72 2.37
1733.69 42.45 296.49 1,556.33 276.72 N 543.88 W 276.72 2.37
1763.52 42.09 296.53 1,578.41 285.68 N 561.84 W 285.68 1.21
1763.52 42.09 296.53 1,578.41 285.68 N 561.84 W 285.68 1.21
1763.52 42.09 296.53 1,578.41 285.68 N 561.84 W 285.68 1.21
1763.52 42.09 296.53 1,578.41 285.68 N 561.84 W 285.68 1.21
1795.95 42.72 296.91 1,602.35 295.51 N 581.37 W 295.51 2.10
1795.95 42.72 296.91 1,602.35 295.51 N 581.37 W 295.51 2.10
1795.95 42.72 296.91 1,602.35 295.51 N 581.37 W 295.51 2.10
1795.95 42.72 296.91 1,602.35 295.51 N 581.37 W 295.51 2.10
1826.66 43.25 297.08 1,624.82 305.01 N 600.03 W 305.01 1.77
1826.66 43.25 297.08 1,624.82 305.01 N 600.03 W 305.01 1.77
1826.66 43.25 297.08 1,624.82 305.01 N 600.03 W 305.01 1.77
1826.66 43.25 297.08 1,624.82 305.01 N 600.03 W 305.01 1.77
1857.01 43.36 297.17 1,646.91 314.50 N 618.56 W 314.50 0.42
1857.01 43.36 297.17 1,646.91 314.50 N 618.56 W 314.50 0.42
INSITE V8.0.20 Page 7Job No:AK-XX-0901144926 Well Name:SP24-SE1 L1 Survey Report
DIRECTIONAL SURVEY DATA
(ft)
Measured Depth DoglegVertical SectionDeparture
(ft)
Latitude
(ft)
Vertical Depth
(deg)
DirectionInclination
(deg)(ft)(ft)(°/100')
1857.01 43.36 297.17 1,646.91 314.50 N 618.56 W 314.50 0.42
1857.01 43.36 297.17 1,646.91 314.50 N 618.56 W 314.50 0.42
1888.71 43.25 297.05 1,669.97 324.41 N 637.91 W 324.41 0.43
1888.71 43.25 297.05 1,669.97 324.41 N 637.91 W 324.41 0.43
1888.71 43.25 297.05 1,669.97 324.41 N 637.91 W 324.41 0.43
1888.71 43.25 297.05 1,669.97 324.41 N 637.91 W 324.41 0.43
1920.62 43.98 297.19 1,693.08 334.45 N 657.50 W 334.45 2.31
1920.62 43.98 297.19 1,693.08 334.45 N 657.50 W 334.45 2.31
1920.62 43.98 297.19 1,693.08 334.45 N 657.50 W 334.45 2.31
1920.62 43.98 297.19 1,693.08 334.45 N 657.50 W 334.45 2.31
1949.32 44.72 296.86 1,713.60 343.56 N 675.37 W 343.56 2.70
1949.32 44.72 296.86 1,713.60 343.56 N 675.37 W 343.56 2.70
1949.32 44.72 296.86 1,713.60 343.56 N 675.37 W 343.56 2.70
1949.32 44.72 296.86 1,713.60 343.56 N 675.37 W 343.56 2.70
1949.32 44.72 296.86 1,713.60 343.56 N 675.37 W 343.56 2.70
1983.10 45.22 296.73 1,737.50 354.32 N 696.68 W 354.32 1.50
1983.10 45.22 296.73 1,737.50 354.32 N 696.68 W 354.32 1.50
1983.10 45.22 296.73 1,737.50 354.32 N 696.68 W 354.32 1.50
1983.10 45.22 296.73 1,737.50 354.32 N 696.68 W 354.32 1.50
2014.35 45.29 297.07 1,759.50 364.37 N 716.48 W 364.37 0.80
2014.35 45.29 297.07 1,759.50 364.37 N 716.48 W 364.37 0.80
2014.35 45.29 297.07 1,759.50 364.37 N 716.48 W 364.37 0.80
2014.35 45.29 297.07 1,759.50 364.37 N 716.48 W 364.37 0.80
2044.25 44.56 296.46 1,780.67 373.87 N 735.33 W 373.88 2.83
2044.25 44.56 296.46 1,780.67 373.87 N 735.33 W 373.88 2.83
2044.25 44.56 296.46 1,780.67 373.87 N 735.33 W 373.88 2.83
2044.25 44.56 296.46 1,780.67 373.87 N 735.33 W 373.88 2.83
2078.78 46.02 295.98 1,804.96 384.72 N 757.34 W 384.72 4.34
2078.78 46.02 295.98 1,804.96 384.72 N 757.34 W 384.72 4.34
2078.78 46.02 295.98 1,804.96 384.72 N 757.34 W 384.72 4.34
2078.78 46.02 295.98 1,804.96 384.72 N 757.34 W 384.72 4.34
2110.11 46.69 295.96 1,826.58 394.64 N 777.73 W 394.64 2.14
2110.11 46.69 295.96 1,826.58 394.64 N 777.73 W 394.64 2.14
2110.11 46.69 295.96 1,826.58 394.64 N 777.73 W 394.64 2.14
2110.11 46.69 295.96 1,826.58 394.64 N 777.73 W 394.64 2.14
2136.55 46.75 296.15 1,844.71 403.10 N 795.02 W 403.10 0.57
2136.55 46.75 296.15 1,844.71 403.10 N 795.02 W 403.10 0.57
2136.55 46.75 296.15 1,844.71 403.10 N 795.02 W 403.10 0.57
2136.55 46.75 296.15 1,844.71 403.10 N 795.02 W 403.10 0.57
2170.91 46.11 294.01 1,868.39 413.65 N 817.56 W 413.65 4.88
2170.91 46.11 294.01 1,868.39 413.65 N 817.56 W 413.65 4.88
2170.91 46.11 294.01 1,868.39 413.65 N 817.56 W 413.65 4.88
2170.91 46.11 294.01 1,868.39 413.65 N 817.56 W 413.65 4.88
2202.22 45.18 291.43 1,890.28 422.30 N 838.21 W 422.30 6.60
2202.22 45.18 291.43 1,890.28 422.30 N 838.21 W 422.30 6.60
INSITE V8.0.20 Page 8Job No:AK-XX-0901144926 Well Name:SP24-SE1 L1 Survey Report
DIRECTIONAL SURVEY DATA
(ft)
Measured Depth DoglegVertical SectionDeparture
(ft)
Latitude
(ft)
Vertical Depth
(deg)
DirectionInclination
(deg)(ft)(ft)(°/100')
2230.13 44.13 290.81 1,910.14 429.37 N 856.51 W 429.37 4.07
2262.03 43.21 289.81 1,933.21 437.02 N 877.16 W 437.02 3.61
2294.29 42.53 287.46 1,956.86 444.03 N 897.95 W 444.03 5.39
2323.44 41.50 286.22 1,978.51 449.68 N 916.63 W 449.68 4.54
2380.86 39.91 284.83 2,022.04 459.71 N 952.70 W 459.71 3.19
2474.26 37.29 280.33 2,095.04 472.46 N 1,009.52 W 472.46 4.11
2567.54 35.43 273.46 2,170.19 479.16 N 1,064.34 W 479.16 4.80
2660.91 34.10 267.82 2,246.91 479.80 N 1,117.52 W 479.80 3.73
2754.32 32.32 261.94 2,325.08 475.30 N 1,168.43 W 475.30 3.94
2833.94 31.34 257.95 2,392.74 467.99 N 1,209.76 W 467.99 2.91
3009.06 28.86 242.30 2,544.47 438.79 N 1,291.86 W 438.79 4.69
3102.34 27.90 232.25 2,626.58 414.95 N 1,329.07 W 414.95 5.22
3195.69 24.76 225.33 2,710.26 387.82 N 1,360.25 W 387.82 4.70
3289.38 25.86 216.72 2,794.98 357.64 N 1,386.43 W 357.64 4.10
3382.44 28.84 207.88 2,877.66 321.51 N 1,409.08 W 321.51 5.41
3475.86 28.66 198.25 2,959.61 280.30 N 1,426.64 W 280.30 4.96
3569.30 29.72 188.82 3,041.23 236.10 N 1,437.21 W 236.10 5.05
3662.64 30.86 179.39 3,121.87 189.27 N 1,440.51 W 189.27 5.23
3756.00 33.30 172.10 3,201.00 139.92 N 1,436.73 W 139.92 4.90
3849.45 37.30 167.49 3,277.27 86.84 N 1,427.06 W 86.84 5.14
3942.84 42.42 165.09 3,348.93 28.73 N 1,412.82 W 28.73 5.72
4036.28 47.32 163.60 3,415.14 34.71 S 1,395.00 W -34.71 5.36
4129.70 50.93 159.78 3,476.27 101.72 S 1,372.76 W -101.72 4.95
4223.13 53.92 155.71 3,533.26 170.20 S 1,344.68 W -170.20 4.71
4316.56 56.82 151.72 3,586.36 239.08 S 1,310.61 W -239.08 4.69
4410.00 59.13 148.52 3,635.92 307.73 S 1,271.13 W -307.73 3.81
4503.38 63.84 146.61 3,680.49 376.95 S 1,227.11 W -376.95 5.35
4596.75 66.33 144.99 3,719.82 446.97 S 1,179.51 W -446.97 3.10
4690.19 69.95 142.30 3,754.61 516.77 S 1,128.10 W -516.77 4.71
4783.67 71.37 141.63 3,785.57 586.24 S 1,073.75 W -586.24 1.66
4877.01 71.38 140.62 3,815.38 655.10 S 1,018.24 W -655.10 1.03
4970.07 71.28 137.47 3,845.18 721.68 S 960.46 W -721.68 3.21
5063.42 74.54 134.41 3,872.61 785.77 S 898.41 W -785.77 4.69
5156.79 74.91 133.31 3,897.21 848.17 S 833.47 W -848.17 1.20
5181.65 75.67 133.34 3,903.52 864.67 S 815.97 W -864.67 3.06
5366.79 83.06 121.06 3,937.79 974.20 S 671.29 W -974.20 7.64
5460.01 84.63 116.91 3,947.79 1,019.09 S 590.23 W -1019.09 4.74
5553.38 86.59 115.31 3,954.94 1,060.06 S 506.64 W -1060.06 2.71
5646.82 88.36 116.08 3,959.06 1,100.53 S 422.53 W -1100.53 2.07
5740.25 88.92 116.38 3,961.27 1,141.81 S 338.75 W -1141.81 0.68
5833.74 88.88 119.89 3,963.07 1,185.88 S 256.33 W -1185.88 3.75
5927.00 89.78 121.66 3,964.16 1,233.60 S 176.21 W -1233.60 2.13
6020.32 88.98 122.96 3,965.17 1,283.47 S 97.35 W -1283.47 1.64
6113.67 87.58 122.29 3,967.97 1,333.78 S 18.77 W -1333.78 1.66
6207.14 87.80 123.40 3,971.74 1,384.43 S 59.70 E -1384.43 1.21
INSITE V8.0.20 Page 9Job No:AK-XX-0901144926 Well Name:SP24-SE1 L1 Survey Report
DIRECTIONAL SURVEY DATA
(ft)
Measured Depth DoglegVertical SectionDeparture
(ft)
Latitude
(ft)
Vertical Depth
(deg)
DirectionInclination
(deg)(ft)(ft)(°/100')
6300.46 88.58 125.33 3,974.69 1,437.08 S 136.69 E -1437.08 2.23
6393.81 88.61 125.71 3,976.98 1,491.29 S 212.64 E -1491.29 0.41
6487.12 87.88 126.14 3,979.83 1,546.02 S 288.17 E -1546.02 0.91
6580.55 87.07 126.09 3,983.95 1,601.03 S 363.57 E -1601.03 0.87
6673.94 87.44 125.46 3,988.42 1,655.56 S 439.25 E -1655.56 0.78
6767.35 87.91 125.50 3,992.21 1,709.73 S 515.25 E -1709.74 0.50
6860.72 87.20 126.89 3,996.19 1,764.82 S 590.53 E -1764.82 1.67
6954.15 88.61 127.42 3,999.61 1,821.21 S 664.95 E -1821.21 1.61
7047.45 89.00 126.75 4,001.56 1,877.46 S 739.36 E -1877.46 0.83
7140.87 88.91 125.11 4,003.26 1,932.27 S 814.99 E -1932.27 1.76
7234.20 88.85 125.96 4,005.08 1,986.50 S 890.92 E -1986.50 0.91
7327.50 88.81 125.68 4,006.99 2,041.09 S 966.56 E -2041.09 0.30
7421.07 89.31 125.39 4,008.52 2,095.46 S 1,042.69 E -2095.47 0.62
7514.61 87.25 124.62 4,011.33 2,149.10 S 1,119.27 E -2149.10 2.35
7607.64 89.22 126.40 4,014.20 2,203.10 S 1,194.96 E -2203.10 2.85
7701.10 88.78 126.26 4,015.83 2,258.46 S 1,270.24 E -2258.46 0.49
7794.43 91.62 126.75 4,015.50 2,313.98 S 1,345.25 E -2313.98 3.09
7887.92 91.96 125.66 4,012.58 2,369.17 S 1,420.65 E -2369.17 1.22
7981.20 92.39 126.74 4,009.04 2,424.22 S 1,495.87 E -2424.22 1.25
8074.52 92.86 125.35 4,004.77 2,479.08 S 1,571.24 E -2479.08 1.57
8167.76 92.92 124.97 4,000.07 2,532.70 S 1,647.37 E -2532.70 0.41
8260.67 90.48 124.32 3,997.31 2,585.49 S 1,723.77 E -2585.49 2.72
8354.53 90.30 124.64 3,996.67 2,638.63 S 1,801.14 E -2638.63 0.39
8447.95 89.11 125.34 3,997.15 2,692.19 S 1,877.67 E -2692.19 1.48
8541.32 88.94 124.13 3,998.74 2,745.39 S 1,954.39 E -2745.39 1.31
8634.64 88.42 122.05 4,000.89 2,796.32 S 2,032.55 E -2796.32 2.30
8728.06 91.06 124.88 4,001.32 2,847.82 S 2,110.46 E -2847.82 4.14
8821.34 88.99 123.99 4,001.28 2,900.57 S 2,187.39 E -2900.57 2.42
8914.73 88.35 125.12 4,003.44 2,953.52 S 2,264.28 E -2953.52 1.39
9008.00 89.10 126.44 4,005.52 3,008.04 S 2,339.93 E -3008.04 1.63
9101.31 88.91 126.25 4,007.14 3,063.33 S 2,415.08 E -3063.33 0.29
9194.71 89.60 127.51 4,008.35 3,119.38 S 2,489.78 E -3119.38 1.54
9288.01 88.95 126.35 4,009.53 3,175.43 S 2,564.35 E -3175.43 1.43
9381.40 86.65 126.35 4,013.12 3,230.74 S 2,639.51 E -3230.74 2.46
9474.85 86.54 126.45 4,018.67 3,286.10 S 2,714.59 E -3286.10 0.16
9568.19 87.07 126.47 4,023.87 3,341.48 S 2,789.55 E -3341.48 0.57
9661.61 89.33 127.31 4,026.81 3,397.52 S 2,864.22 E -3397.53 2.58
9754.95 90.40 127.52 4,027.03 3,454.24 S 2,938.36 E -3454.24 1.17
9848.32 87.89 126.79 4,028.42 3,510.62 S 3,012.76 E -3510.62 2.80
9941.68 87.37 127.23 4,032.28 3,566.77 S 3,087.24 E -3566.77 0.73
10035.17 87.52 127.11 4,036.45 3,623.20 S 3,161.67 E -3623.20 0.21
10128.53 88.26 126.97 4,039.88 3,679.40 S 3,236.14 E -3679.40 0.81
10221.85 88.35 126.67 4,042.64 3,735.30 S 3,310.81 E -3735.30 0.34
10315.17 90.10 127.24 4,043.91 3,791.39 S 3,385.37 E -3791.39 1.97
10408.69 92.04 127.85 4,042.16 3,848.37 S 3,459.50 E -3848.37 2.17
INSITE V8.0.20 Page 10Job No:AK-XX-0901144926 Well Name:SP24-SE1 L1 Survey Report
DIRECTIONAL SURVEY DATA
(ft)
Measured Depth DoglegVertical SectionDeparture
(ft)
Latitude
(ft)
Vertical Depth
(deg)
DirectionInclination
(deg)(ft)(ft)(°/100')
10502.00 91.90 126.86 4,038.95 3,904.95 S 3,533.63 E -3904.95 1.07
10595.47 89.95 126.36 4,037.44 3,960.68 S 3,608.65 E -3960.68 2.15
10688.81 89.72 125.91 4,037.71 4,015.72 S 3,684.03 E -4015.73 0.54
10782.16 90.92 126.42 4,037.19 4,070.81 S 3,759.39 E -4070.81 1.40
10875.54 92.71 126.28 4,034.23 4,126.13 S 3,834.56 E -4126.13 1.92
10968.90 93.05 126.96 4,029.54 4,181.75 S 3,909.40 E -4181.75 0.81
11062.25 91.26 126.29 4,026.03 4,237.39 S 3,984.26 E -4237.39 2.05
11155.72 89.15 126.09 4,025.70 4,292.58 S 4,059.69 E -4292.58 2.27
11249.00 89.88 125.93 4,026.49 4,347.42 S 4,135.14 E -4347.42 0.80
11342.39 90.41 127.53 4,026.25 4,403.27 S 4,209.99 E -4403.27 1.80
11435.83 90.32 126.68 4,025.66 4,459.64 S 4,284.51 E -4459.64 0.91
11529.29 89.82 127.13 4,025.54 4,515.76 S 4,359.24 E -4515.76 0.72
11622.69 90.27 127.18 4,025.47 4,572.17 S 4,433.68 E -4572.17 0.48
11716.01 89.63 125.62 4,025.55 4,627.55 S 4,508.79 E -4627.55 1.81
11809.35 90.80 125.53 4,025.20 4,681.85 S 4,584.71 E -4681.85 1.26
11902.71 90.28 124.69 4,024.32 4,735.54 S 4,661.08 E -4735.54 1.06
11996.09 90.68 124.69 4,023.54 4,788.68 S 4,737.85 E -4788.68 0.43
12089.41 90.85 124.20 4,022.29 4,841.46 S 4,814.81 E -4841.46 0.56
12182.76 90.80 124.52 4,020.95 4,894.14 S 4,891.86 E -4894.14 0.35
12276.06 89.40 123.31 4,020.79 4,946.20 S 4,969.28 E -4946.20 1.98
12369.34 87.93 124.18 4,022.96 4,998.00 S 5,046.82 E -4998.00 1.83
12462.72 87.84 123.61 4,026.41 5,050.04 S 5,124.28 E -5050.04 0.62
12556.05 89.66 125.99 4,028.44 5,103.29 S 5,200.89 E -5103.29 3.21
12649.69 86.78 126.58 4,031.35 5,158.67 S 5,276.33 E -5158.67 3.14
12742.86 87.83 126.67 4,035.73 5,214.19 S 5,351.02 E -5214.19 1.13
12836.30 89.78 127.90 4,037.68 5,270.78 S 5,425.34 E -5270.78 2.47
12929.64 90.78 127.97 4,037.22 5,328.16 S 5,498.96 E -5328.16 1.07
13023.00 89.79 127.03 4,036.76 5,384.99 S 5,573.02 E -5384.99 1.46
13116.45 91.24 125.44 4,035.92 5,440.22 S 5,648.39 E -5440.22 2.30
13209.84 91.72 125.16 4,033.51 5,494.17 S 5,724.58 E -5494.17 0.59
13303.28 92.52 125.50 4,030.05 5,548.17 S 5,800.76 E -5548.17 0.93
13396.70 92.82 126.18 4,025.70 5,602.81 S 5,876.41 E -5602.81 0.79
13490.13 90.11 125.18 4,023.31 5,657.28 S 5,952.27 E -5657.28 3.09
13583.56 89.59 124.87 4,023.55 5,710.90 S 6,028.78 E -5710.90 0.65
13677.00 91.64 125.56 4,022.55 5,764.78 S 6,105.11 E -5764.78 2.31
13770.38 89.71 124.46 4,021.45 5,818.34 S 6,181.58 E -5818.34 2.38
13863.75 89.00 121.30 4,022.50 5,869.02 S 6,259.98 E -5869.02 3.47
13957.19 90.89 124.50 4,022.59 5,919.77 S 6,338.42 E -5919.77 3.98
14050.67 90.07 125.17 4,021.81 5,973.16 S 6,415.15 E -5973.16 1.13
14144.01 89.51 125.08 4,022.15 6,026.86 S 6,491.49 E -6026.86 0.61
14237.07 89.82 124.75 4,022.70 6,080.13 S 6,567.80 E -6080.13 0.49
14330.42 90.91 124.09 4,022.10 6,132.89 S 6,644.80 E -6132.89 1.37
14423.79 90.64 125.28 4,020.84 6,186.02 S 6,721.57 E -6186.02 1.31
14517.24 90.61 123.71 4,019.82 6,238.94 S 6,798.58 E -6238.94 1.68
14610.62 92.24 124.11 4,017.50 6,291.02 S 6,876.05 E -6291.02 1.80
INSITE V8.0.20 Page 11Job No:AK-XX-0901144926 Well Name:SP24-SE1 L1 Survey Report
DIRECTIONAL SURVEY DATA
(ft)
Measured Depth DoglegVertical SectionDeparture
(ft)
Latitude
(ft)
Vertical Depth
(deg)
DirectionInclination
(deg)(ft)(ft)(°/100')
14703.93 91.95 124.09 4,014.09 6,343.29 S 6,953.27 E -6343.29 0.31
14797.36 89.20 123.62 4,013.15 6,395.34 S 7,030.84 E -6395.34 2.99
14890.76 91.20 123.42 4,012.82 6,446.91 S 7,108.71 E -6446.91 2.15
14984.04 89.35 120.46 4,012.37 6,496.25 S 7,187.85 E -6496.25 3.74
15077.41 88.13 119.94 4,014.43 6,543.21 S 7,268.53 E -6543.21 1.42
15159.44 89.34 120.62 4,016.24 6,584.56 S 7,339.35 E -6584.56 1.69
15225.00 89.34 120.62 4,016.99 6,617.95 S 7,395.76 E -6617.95 0.00
DIRECTIONAL SURVEY DATA NOTES
- Calculation based on minimum curvature method.
- Survey coordinates relative to well system reference point.
- TVD values given relative to drilling measurement point.
- Vertical section relative to well head.
- Vertical section is computed along a direction of 0.00 degrees (Grid)
- A total correction of 0.00 deg from Magnetic north to Grid north has been applied
- Horizontal displacement is relative to the well head.
- Horizontal displacement (closure) at 15,225.00 feet is 9,924.44 feet along 131.82 degrees (Grid)
WARRANTY
HALLIBURTON ENERGY SERVICES, INC. WILL USE ITS BEST EFFORTS TO FURNISH CUSTOMERS WITH ACCURATE INFORMATION
AND INTERPRETATIONS THAT ARE PART OF, AND INCIDENT TO, THE SERVICES PROVIDED. HOWEVER, HALLIBURTON ENERGY
SERVICES, INC. CANNOT AND DOES NOT WARRANT THE ACCURACY OR CORRECTNESS OF SUCH INFORMATION AND
INTERPRETATIONS. UNDER NO CIRCUMSTANCES SHOULD ANY SUCH INFORMATION OR INTERPRETATION BE RELIED UPON AS
THE SOLE BASIS FOR ANY DRILLING, COMPLETION, PRODUCTION, OR FINANCIAL DECISION OR ANY PROCEDURE INVOLVING ANY
RISK TO THE SAFETY OF ANY DRILLING VENTURE, DRILLING RIG OR ITS CREW OR ANY THIRD PARTY. THE CUSTOMER HAS FULL
RESPONSIBILITY FOR ALL DRILLING, COMPLETION, AND PRODUCTION OPERATION. HALLIBURTON ENERGY SERVICES, INC.
MAKES NO REPRESENTATIONS OR WARRANTIES, EITHER EXPRESSED OR IMPLIED, INCLUDING, BUT NOT LIMITED TO, THE
IMPLIED WARRANTIES OF MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE, WITH RESPECT TO THE SERVICES
RENDERED. IN NO EVENT WILL HALLIBURTON ENERGY SERVICES, INC. SERVICES BE LIABLE FOR FAILURE TO OBTAIN ANY
PARTICULAR RESULTS OR FOR ANY DAMAGES, INCLUDING, BUT NOT LIMITED TO, INDIRECT, SPECIAL OR CONSEQUENTIAL
DAMAGES, RESULTING FROM THE USE OF ANY INFORMATION OR INTERPRETATION PROVIDED BY HALLIBURTON ENERGY
SERVICES, INC.
INSITE V8.0.20 Page 12Job No:AK-XX-0901144926 Well Name:SP24-SE1 L1 Survey Report