Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
HOME
EVENTS
DATA
Data List
Drilling
Production
Orders
Data Miner
Document Search
REPORTS
Reports and Charts
Pool Statistics
FORMS
LINKS
Links
Test Notification
Data Requests
Regulations
Industry Guidance Bulletins
How to Apply
ABOUT US
History
Staff
HELP
Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
193-012
David Douglas Hilcorp Alaska, LLC Sr. GeoTechnician 3800 Centerpoint Drive, Suite 1400 Anchorage, AK 99503 Tele: 907 777-8337 E-mail: David.Douglas@hilcorp.com Please acknowledge receipt by signing and returning one copy of this transmittal Received By: Date: DATE: 6/21/2023 To: Alaska Oil & Gas Conservation Commission Natural Resource Technician 333 W 7th Ave Suite 100 Anchorage, AK 99501 DATA TRANSMITTAL WELL: MPU L-13 PTD: 193-012 API: 50-029-22335-00-00 BAKER FINAL LWD LOGS (03-MAY-1993) Scanned Log Prints – 2”/5” MD and 2”/5” TVD (PDF and TIF Format) Please include current contact information if different from above. PTD: 193-012 T37777 Kayla Junke Digitally signed by Kayla Junke Date: 2023.06.21 13:48:55 -08'00' By Grace Christianson at 2:20 pm, Jun 08, 2023 Abandoned 5/26/2023 JSB RBDMS JSB 060823 xG / 323-161 DSR-6/21/23MGR08AUG2023 6.8.2023 Digitally signed by Monty M Myers DN: cn=Monty M Myers, c=US, o=Hilcorp Alaska, LLC, ou=Technical Services - AK Drilling, email=mmyers@hilcorp.com Reason: I am approving this document Date: 2023.06.08 13:57:21 -08'00' Monty M Myers _____________________________________________________________________________________ Revised By JNL 6/8/2023 SCHEMATIC Milne Point Unit Well: MPU L-13 Last Completed: 3/29/2023 PTD: 193-012 TD =11,016’ (MD) / TD = 7,409’(TVD) 20” Orig. KB Elev.:51’/ Orig. GL Elev.: 15.3’ 7” 9-5/8” 1 Whipstock set @ 10530’ PBTD = 10,530’(MD) / PBTD = 7,092’(TVD) KUP C / B Silts KUP A Sands 2 3 4 CASING DETAIL Size Type Wt/ Grade/ Conn ID Top Btm 13-3/8" Conductor 54.5 / K-55 / BTRC 12.415 Surface 80' 9-5/8" Surface 47 / N-80 / BTRS 8.681 Surface 6,086’ 7" Production 26 / L-80 / BTRC 6.276 Surface 10,996’ TUBING DETAIL 4-1/2" Tubing 12.6 / L-80 / DWC 3.958 Surface 10,390’ JEWELRY DETAIL No Depth Item 1 10,175’ Viking Sliding Sleeve VXD 2 10,237’ 7'' x 4.5'' Tri-Point Hydratrieve packer 3 10,297’ XN Nipple w/ RHC – ID= 3.813” 4 10,388’ WLEG: Bottom @ 10,390’ PERFORATION DETAIL Sands Top (MD) Btm (MD) Top (TVD) Btm (TVD) FT Date Status Kuparuk 10,498’ 10,518’ 7,072’ 7,084’ 20 5/10/1993 Open 10,529’ 10,539’ 7,091’ 7,098’ 10 5/10/1993 Closed 10,554’ 10,564’ 7,107’ 7,113’ 10 5/10/1993 Closed 10,598’ 10,618’ 7,135’ 7,148’ 20 5/10/1993 Closed 10,626’ 10,656’ 7,153’ 7,172’ 30 5/10/1993 Closed 10,669’ 10,719’ 7,180’ 7,213’ 50 5/10/1993 Closed 4.5” Guns 12SPF OPEN HOLE / CEMENT DETAIL 26” 300 sx of Arctic set I 12-1/4" 1,780 sx of Arctic set III, 300 sx Class ‘G’ 8-1/2” 325 sx Class ‘G’ WELL INCLINATION DETAIL KOP @ 500’ Max Hole Angle = 54.5 deg. @ 3,811’ MD TREE & WELLHEAD Tree 2-9/16” – 5M WKM Wellhead 11” 5M WKM, w/ 2-7/8” x 11” Tubing Hanger, 2-7/8” EUE 8rd Threads, 2.5” “H” BPV profile. GENERAL WELL INFO 50-029-22335-00-00 Drilled and Cased by Nabors 22E - 5/16/1993 ESP Change-out by Nabors 4ES – 2/22/1995, 11/17/1999 & 8/3/2003 ESP Change-out by Nabors 3S – 1/27/2008 & 6/14/2008 ESP Change-out by Doyon 16 – 12/12/2013 RWO Prep, Install 4-1/2” Completion by ASR – 3/29/2023 STIMULATION DETAIL Frac - 41,146# of 16/20 Carbolite behind pipe ACTIVITYDATE SUMMARY 3/29/2023 Assist ASR with Freeze protect/Set packer. Pumped 10 bbls of 10.2 ppg brine with 4 gal of ConQor 303 inhibitor. Pumped 23 bbls of 10.2 ppg brine down IA, ASR pumped remaining 107 bbls10.2 ppg brine. Pumped 18 bbls diesel down IA. **Continued on 3-30-23 3/30/2023 **Continued from 3-29-23 WSR** Continued pumping 37 bbls diesel (Total of 55) down IA. Swap to TBG and pumped 1.9 bbls diesel to pressure up to 4040 psi to set packer. ASR charting MIT. Repressured up TBG to 3317 psi. ASR charting. Swapped back to IA and pressured up to 3782 psi with 3 bbls diesel. ASR charting MIT. 3/31/2023 WELLHEAD: M/U hanger to string landed hanger at RKB of 19' RILDS S/B to pump and test. SET 4'' CTS bpv S/B for RDMO. Cleaned up hanger and set CTS plug M/U tree/adapter PT 500 low 5000 high 5/10 minutes. Tested tree, all tests good pulled CTS plug/BPV, secured well. 4/1/2023 T/I/O=50/0/0 Freeze Protect (Post RWO) Pumped 8 bbls of 50* diesel down TBG. Final Whps=0/0/0 4/1/2023 ***SHIFT SSD OPEN @ 10193' SLM,,PULL BALL AND ROD @ 10304'SLM, PULL RHC @ 10308 SLM. SET JET PUMP SER# 00046 IN XD SSD( 3.813") 69" OAL W/ SCREEN. RATIO 12 A @ 10193' SLM.RDMO.**** 4/5/2023 T/I/O=348/350/0 Freeze Protect TBG/IA (post RWO) Pumped 8 bbls 60/40 down IA. **Continued on 4-6-23 WSR** 4/6/2023 ***Continued from 4-5-23 WSR*** Continued to pump 47 bbls (Total of 55) 60/40 down IA. Pumped 45 bbls 60/40 down TBG. Final Whps=650/640/0 5/16/2023 *** WELL SHUT-IN ON ARRIVAL.*** PULL 3" JETPUMP (serial# - 00046, ratio:12A) FROM VXD-SS AT 10,175' MD, SHIFT VXD-SS CLOSED W/ 4-1/2" 42BO AT 10,175' MD. PUMP 4bbls DIESEL DOWN IA, UNABLE TO CATCH PRESSURE. TAG TD AT 10,730' SLM W/ 20' x 3.70" DUMMY WHIPSTOCK (No issues). *** WELL SHUT-IN ON DEPARTURE, PAD OP NOTIFIED.*** 5/17/2023 T/I = 510/550 Pressure Test to ensure sleeve is closed, Pumped 5 bbls tubing and ia pressure tracking, injection at 1 bpm, FWP = 54/600 5/18/2023 *** WELL SHUT-IN ON ARRIVAL.*** RAN 4-1/2" 42BO TO VXD-SS AT 10,175' MD CLOSED SLEEVE (Appears open). PRESSURE TEST IA TO 1500psi FOR 15 MINUTES (Holding). *** WELL SHUT-IN ON DEPARTURE, PAD OP NOTIFIED.*** Daily Report of Well Operations PBU MPL-13 Activity Date Ops Summary 5/24/2023 Remove jeeps. Set rig down at 13:00. Begin MIRU checklists. Leak tight test SV and MV with 600 psi well pressure. Remove tree cap, lower BOP stack onto tree M/U flange bolts. Continue MIRU checklists. Boot e-line. Get on well fill reel forward 0.5 bpm pump 7 bbls MeOH ahead. Reverse circ slack into reel. Cable isn't moving. Lift injector off and re-boot cable. Pump backwards 3.4 bpm cable is moving. Skid injector back and rig up hydraulic cutter. Cut 280' of CT. Install CT connector. Pull test to 50k, good. Pump slack forward to re-head. Install BHI cable head. 5/25/2023 Fluid pack coil. PT Inner reel iron, Reel, CTC, UQC to 7K for 5 min. Good test. Stab on and pump slack forward for reel volume. Perform Initial BOPE test. Witnessed waived by AOGCC Sean Sullivan. Test 250 psi / 3500 psi. Test 1: Packoff, IRV, C7, C9, C10, C11 Pass. Test 2: Blind/shear, C15, R2, BL2 (R2 Fail / Grease / Pass). Test 3: Annular (2-3/8"), TIW#1, B1, B4 Pass. Test 4: Upper 2-3/8" Pipe / Slip, TIW#2, B2, B3 Pass. Test 5: Lower 2-3/8" Pipe/ Slip, C5, C6, C8, TV2 Pass. Test 6: Choke A, Choke C Pass. Test 7: C1, C4, TV1 Pass. Test 8: 3" Pipe/ Slip, C2, C3 Pass. Accumulator draw down. Tested gas alarms. Rig down BOPE testing equipment. Remove test risers. Space out for drilling operations. Pressure test off drillers PDL and drilling risers to 3500 psi. Pass. Pressure test driller PDL to 3500 psi. PT floats, good. Install IA, OA sensors. Load ODS PDL with BHI tools. M/U nozzle w/ stinger, get on well. Open well, 480 psi static. Pump 0.5 bpm = 560 psi. 1.1 bpm = 680 psi. 1.5 bpm = 820 psi climbs reduce rate1.4 bpm to stay < 1200 psi. Pump tbg volume = 160 bbls at 1.4 bpm. Shut MV bleed off 700 psi. Close SSV. Need to use MV and SSV for deploy due to whipstock length. Skid injector back remove nozzle. Pressure Deploy whipstock. RIH BHA #1 - whipstock. Verify EDC open. Set pump and slackoff trips close while RIH. Log tie-in from 10200' correct -11.5'. Up wt at 10330' is 51k. Drift down to 10650' prior to CCL log (no DWOB in CCL mode). Clean pass, PU to 10400' switch to CCL mode log down. Our CCL matches program, no shift needed. RIH to set depth and PU to just less than breakover. Close EDC. Shears 4000 psi. Slack off set 4.1k DWOB on it solid, good set. WS set with TOWS at 10530' at 0R orientation. PU and open EDC, swap well to mud. POOH 5/26/2023 Pooh. Mud Weight: 8.72 ppg in, 8.77 ppg out. Rate: 2.74 bpm in, 2.17 bpm out Window ECD 10.2. Pressure Un-Deploy whipstock setting BHA#1. Deploy window milling BHA#2. Swap out flow sub. PT break. Pressure Deploy BHA#2. RIH with window milling BHA #2. Rate: 0.36 bpm in, 0.90 bpm out. Circ pressure: 1197 psi. Mud Weight: 8.72 ppg in, 8.78 ppg out Window ECD: 10.22 ppg. Log down for tie-in from 10230' to 10288.11' MD (formation) with -14' correction. Dry tag 10537.96'. PU and establish parameters. - Rate: 2.53 bpm in, 2.48 bpm out. Circ pressure: 2726 psi. Mud Weight: 8.72 ppg in, 8.78 ppg out Window ECD: 10.22 ppg. 10537 begin time milling window. Continue milling window. Pre-load DS PDL for next run while milling. Mill 2.4 / 2.3 bpm w/ 11.77# ECD WHP = 639 psi. 8.70 / 8.76 ppg In / Out. String reamer has exited 10546' drill rathole to 10555'. Sample from 10555' is 10% formation. Pump 5 bbls lo-vis. Reaming passes 1 ft/min. 1st up 90 psi motor work 10538.2'. 1st down 65 psi MW 10539.8'. 2nd up 60 psi MW 10538.0'. 2nd down 40 psi MW 10539.4. 3rd up 37 psi MW 10538.0'. Continue reaming passes. 3rd down 30 psi MW 10539.5'. 4th up 35 psi MW 10537.6'. Dry drift is clean, tag 10555' end of rathole. PU above window and open EDC. POOH pump 2.5 bpm keep 11.8# ECD at window. Tag stripper and space out. Undeploy BHA #2. Mill and reamer 3.80" Go / 3.79" NoGo. M/U nozzle, jet stack. Pressure deploy BHA #3. 50-029-22335-01-00API #: Well Name: Field: County/State: MP L-13A Milne Point Hilcorp Energy Company Composite Report , Alaska 5/26/2023Spud Date: Dry tag 10537.96'. STATE OF ALASKA OIL AND GAS CONSERVATION COMMISSION BOPE Test Report for: Reviewed By: P.I. Suprv Comm ________MILNE PT UNIT L-13 JBR 04/27/2023 MISC. INSPECTIONS: FLOOR SAFTY VALVES:CHOKE MANIFOLD:BOP STACK: ACCUMULATOR SYSTEM:MUD SYSTEM: P/F P/F P/FP/FP/F Visual Alarm QuantityQuantity Time/Pressure SizeQuantity Number of Failures:2 Tested with 3 test joints - 2 7/8", 3 1/2", and 4 1/2". Test # 3 K-5 kill manifold valve failed to hold , tested around K-5 till replaced, retested and passed. Test # 7 Blinds leaking past rod seals. Replace seals, retest, Pass. Test Results TEST DATA Rig Rep:Colt PaceOperator:Hilcorp Alaska, LLC Operator Rep:Aaron Haberthur Rig Owner/Rig No.:Hilcorp ASR 1 PTD#:1930120 DATE:3/23/2023 Type Operation:WRKOV Annular: 250/2500Type Test:INIT Valves: 250/3000 Rams: 250/3000 Test Pressures:Inspection No:bopSTS230322091843 Inspector Sully Sullivan Inspector Insp Source Related Insp No: INSIDE REEL VALVES: Quantity P/F (Valid for Coil Rigs Only) Remarks: Test Time 13 MASP: 2858 Sundry No: 323-161 Control System Response Time (sec) Time P/F Housekeeping:P PTD On Location P Standing Order Posted P Well Sign P Hazard Sec.P Test Fluid W Misc NA Upper Kelly 1 P Lower Kelly 0 NA Ball Type 1 P Inside BOP 1 P FSV Misc 0 NA 16 PNo. Valves 1 PManual Chokes 1 PHydraulic Chokes 0 NACH Misc Stripper 0 NA Annular Preventer 1 11"P #1 Rams 1 VBR 2 7/8" x P #2 Rams 1 Blinds FP #3 Rams 0 NA #4 Rams 0 NA #5 Rams 0 NA #6 Rams 0 NA Choke Ln. Valves 1 2 1/16"P HCR Valves 1 2 1/16"P Kill Line Valves 2 2 1/16"P Check Valve 0 NA BOP Misc 1 k-5 2" piper FP System Pressure P3000 Pressure After Closure P1800 200 PSI Attained P10 Full Pressure Attained P50 Blind Switch Covers:Pall stations Bottle precharge P Nitgn Btls# &psi (avg)P4@2287 ACC Misc NA0 P PTrip Tank P PPit Level Indicators P PFlow Indicator P PMeth Gas Detector P PH2S Gas Detector NA NAMS Misc Inside Reel Valves 0 NA Annular Preventer P11 #1 Rams P6 #2 Rams P5 #3 Rams NA0 #4 Rams NA0 #5 Rams NA0 #6 Rams NA0 HCR Choke P2 HCR Kill NA0 9 9 9 9 9 9999 9 9 FP FP K-5 kill manifold valve failed Blinds leaking 1. Operations Susp Well Insp Plug Perforations Fracture Stimulate Pull Tubing Operations shutdown Performed: Install Whipstock Perforate Other Stimulate Alter Casing Change Approved Program Mod Artificial Lift Perforate New Pool Repair Well Coiled Tubing Ops Other: CTD Prep Development Exploratory Stratigraphic Service 6. API Number: 7. Property Designation (Lease Number): 8. Well Name and Number: 9. Logs (List logs and submit electronic data per 20AAC25.071): 10. Field/Pool(s): 11. Present Well Condition Summary: Total Depth measured 11,016 feet N/A feet true vertical 7,409 feet N/A feet Effective Depth measured 10,868 feet 10,237 feet true vertical 7,311 feet 6,912 feet Perforation depth Measured depth See Schematic feet True Vertical depth See Schematic feet Tubing (size, grade, measured and true vertical depth)4-1/2" 12.6# / L-80 / CDW 10,390' 7,005' Packers and SSSV (type, measured and true vertical depth)7'' x 4.5'' Tri-Point N/A See Above N/A 12. Stimulation or cement squeeze summary: N/A Intervals treated (measured): Treatment descriptions including volumes used and final pressure: N/A 13a. Prior to well operation: Subsequent to operation: 13b. Pools active after work: 15. Well Class after work: Daily Report of Well Operations Exploratory Development Service Stratigraphic Copies of Logs and Surveys Run 16. Well Status after work: Oil Gas WDSPL Electronic Fracture Stimulation Data GSTOR GINJ SUSP SPLUG Sundry Number or N/A if C.O. Exempt: Authorized Name and Digital Signature with Date: Contact Name: Contact Email: Authorized Title: Operations Manager Contact Phone: 6,870psi 7,240psi10,996' 7,396' Burst 3,730psi Collapse 1,130psi 4,760psi 5,410psi Casing Conductor 10,996' 6,086'Surface Production 13-3/8" 9-5/8" 7" 80' 6,086' measured TVD STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS 193-012 50-029-22335-00-00 3800 Centerpoint Dr, Suite 1400 Anchorage, AK 99503 3. Address: Hilcorp Alaska LLC N/A 5. Permit to Drill Number:2. Operator Name 4. Well Class Before Work: ADL0025509 MILNE POINT / KUPARUK RIVER OIL MILNE PT UNIT L-13 Plugs Junk measured Length measured true vertical Packer Representative Daily Average Production or Injection Data Casing Pressure Tubing Pressure 14. Attachments (required per 20 AAC 25.070, 25.071, & 25.283) 0 Gas-Mcf MD 80' 900 Size 80' 4,409' 05800 0 00 0 323-161 Sr Pet Eng: Sr Pet Geo: Sr Res Eng: WINJ WAG 0 Water-BblOil-Bbl 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. N/A Taylor Wellman twellman@hilcorp.com 907-777-8449 Form 10-404 Revised 10/2022 Due Within 30 days of Operations Submit in PDF format to aogcc.permitting@alaska.gov By Kayla Junke at 9:03 am, Apr 25, 2023 Digitally signed by David Haakinson (3533) DN: cn=David Haakinson (3533), ou=Users Date: 2023.04.25 06:30:10 -08'00' David Haakinson (3533) DSR-4/26/23 RBDMS JSB 050223 MILNE PT UNIT L-13 323-161 Pull Tubing CTD Prep 193-012 WCB 12-29-2023 MILNE POINT / KUPARUK RIVER OIL _____________________________________________________________________________________ Revised By TDF: 3/29/2023 SCHEMATIC Milne Point Unit Well: MPU L-13 Last Completed: 3/29/2023 PTD: 193-012 TD =11,016’ (MD) / TD = 7,409’(TVD) 20” Orig. KB Elev.:46’/ Orig. GL Elev.: 16.5’ Nabors 22E / RT to 7”Hanger= 28.5’ 7” 9-5/8” 1 PBTD = 10,868’(MD) / PBTD = 7,311’(TVD) KUP B Sands KUP A Sands 2 3 4 CASING DETAIL Size Type Wt/ Grade/ Conn ID Top Btm 13-3/8" Conductor 54.5 / K-55 / BTRC 12.415 Surface 80' 9-5/8" Surface 47 / N-80 / BTRS 8.681 Surface 6,086’ 7" Production 26 / L-80 / BTRC 6.276 Surface 10,996’ TUBING DETAIL 4-1/2" Tubing 12.6 / L-80 / DWC 3.958 Surface 10,390’ JEWELRY DETAIL No Depth Item 1 10,175’ Viking Sliding Sleeve VXD 2 10,237’ 7'' x 4.5'' Tri-Point Hydratrieve packer 3 10,297’ XN Nipple w/ RHC – ID= 3.813” 4 10,388’ WLEG: Bottom @ 10,390’ PERFORATION DETAIL Sands Top (MD) Btm (MD) Top (TVD) Btm (TVD) FT Date Status Kuparuk 10,498’ 10,518’ 7,072’ 7,084’ 20 5/10/1993 Open 10,529’ 10,539’ 7,091’ 7,098’ 10 5/10/1993 Open 10,554’ 10,564’ 7,107’ 7,113’ 10 5/10/1993 Open 10,598’ 10,618’ 7,135’ 7,148’ 20 5/10/1993 Open 10,626’ 10,656’ 7,153’ 7,172’ 30 5/10/1993 Open 10,669’ 10,719’ 7,180’ 7,213’ 50 5/10/1993 Open 4.5” Guns 12SPF OPEN HOLE / CEMENT DETAIL 13-3/8”" 300 sx of Arcticset I in 26” Hole 9-5/8" 1,780 sx of Arcticset III, 3000 sx Class ‘G’ in 12-1/4” Hole 7” 325 sx Class “G” in 8-1/2” Hole WELL INCLINATION DETAIL KOP @ 500’ Max Hole Angle = 54.5 deg. @ 3,811’ MD TREE & WELLHEAD Tree 2-9/16” – 5M WKM Wellhead 11” 5M WKM, w/ 2-7/8” x 11” Tubing Hanger, 2-7/8” EUE 8rd Threads, 2.5” “H” BPV profile. GENERAL WELL INFO 50-029-22335-00-00 Drilled and Cased by Nabors 22E - 5/16/1993 ESP Change-out by Nabors 4ES – 2/22/1995, 11/17/1999 & 8/3/2003 ESP Change-out by Nabors 3S – 1/27/2008 & 6/14/2008 ESP Change-out by Doyon 16 – 12/12/2013 RWO Prep, Install 4-1/2” Completion by ASR – 3/29/2023 STIMULATION DETAIL Frac - 41,146# of 16/20 Carbolite behind pipe Well Name Rig API Number Well Permit Number Start Date End Date MP L-13 LRS & ASR#1 50-029-22335-00-00 193-012 3/21/2023 3/29/2023 3/17/2022 - Friday No operations to report. 3/15/2022 - Wednesday Hilcorp Alaska, LLC Weekly Operations Summary No operations to report. 3/16/2022 - Thursday No operations to report. T/I/O = 871/819/588 Well Kill (PRWO) Pumped 15 bbls Hot Diesel down Tubing taking returns up IA into tank, Pumped 530 bbls 10.2 brine down Tubing taking returns up IA into tank, 397 bbls total returns back to surface tank, FWP = vac/vac/650. Fly off well house. Wells group pumped well kill and set BPV/CTS on L-13. Disconnect manifold and lines from well kill, bled void and N/d Tree. Spot in mud boat. R/u Crane, N/u BOP's, fly on well house, rig floor and stairs. Fly up tongs to floor. Layout koomey lines and winterize. Set in heaters, R/d crane. Spot in pits and install stairs and cribbing, torques up BOP stack, Spot ASR on mud boat. Level rig and raise mast, secure guy lines and rack pin, install tarps under rig, hookup and winterize circulating lines, layout containment and spot catwalk, R/u pipe shed No operations to report. 3/18/2022 - Saturday No operations to report. 3/21/2023 - Tuesday 3/19/2023 - Sunday No operations to report. 3/20/2023 - Monday Well Kill Spot ASR on mud boat. Level rig and raise mast, secure guy lines and rack pin, install tarps under rig, hookup and winterize circulating lines, layout containment and spot catwalk, R/u pipe shed Well Name Rig API Number Well Permit Number Start Date End Date MP L-13 ASR#1 50-029-22335-00-00 193-012 3/21/2023 3/29/2023 3/24/2022 - Friday Continue to POOH w/ 2-7/8 EUE and ESP pumping double displacement. Discharge head to the rig floor. rig up to lay down completion. L/D completion as per Baker rep. Full recovery of clamps, flat guards and protectolizers. P/U and M/U wear ring puller and Wear ring. Troubleshoot possible broken lockdown screw on tubing hanger spool. Function lockdown all the way in and back out. cover wear ring in dope for indicator. run wear ring. wear ring stopped at correct RKB. pulled wear ring. no signs of lockdown hitting. place lockdown in and secure with 2 lockdown screws. Wear ring ID 6.4375". Lay down all ESP running equipment. Rig down sheave and elephant trunk. Lay down clamps and place in containment. Clear pipe shed of all ESP equipment. Start loading pipe shed of BHA and DP. Bring swivel valve to floor and install. Filled hole with 20bbbls of 10.2 Brine. Bring BHA to floor. M/U BHA as per Yellowjacket rep as following: 6 1/8"x4 3/4" Shoe, 5 11/16" Top Sub, XO, 2-4 3/4" Boot Baskets, 4 3/4" Bit Sub, 4 3/4" Bumper, 4 3/4" Oil Jar, 9-4 3/4" Drill Collars and OX to 3 1/2" IF wk string. BHA=312.60'. Changed out handing tools prep to RIH with wk. string. RIH w/Milling assembly P/u 3-1/2" wk. string f/312' t/3460'. PJSM, Crew change check fluids and serviced rig, crew preformed bare pipe shut-in drill. Offload 200bbls of 10.2ppg KWF in upright. Pumped 10bbls of 10.2ppg Brine and cont RIH w/Milling assembly P/u 3-1/2" wk. string f/3460' t/8200' at report time. 3/22/2022 - Wednesday Hilcorp Alaska, LLC Weekly Operations Summary Set tool skid, connex and glycol unit, finish winterization around rig. Spot camps and hookup electrical and comm's. Build 2- 7/8", 3-1/2", and 4-1/2" test joints. R/u BOP testing eq. Rig accepted @ 13:00 3-22-23 Flood stack with freshwater and purge air out of system. Shell test BOP's 250-3000psi good test. Tested BOPE per Sundry as following: Annular 250-3000psi, Rams 250-3000psi, Valves 250-3000psi, test fire & gas and preformed Koomey drawdown. Two failures recorded K5 and Blinds. Replaced K5 and sequential test was good. Blind leaking from weep hose. Called out Yellow Jacket. While waiting on YJ rep to arrive, Spot in spooler unit and hung cable sheave and elephant trunk. Pulled rope from spooler thru sheave. Yellow Jacket arrived removed ram bonnet and redress packing and seals. Test Blinds 250-3000psi-good test. Witness by AOGCC Inspector Sully Sullivan. R/d Testing eq. Checking IA static, Pulled BPV/CTS and Tbg was static, P/u landing jt and BOLDS, pulled hanger off seat at 83k to rig floor, PUW=72k. Cut cable and secured to rope. De-complete hanger, found gouge in hanger (possibly a broken lockdown screw) L/d hanger and landing jt. Pumped 15bbls 10.2ppg brine to fill hole. Calculated static fluid losses at 32bph. POOH L/d 2-7/8" completion and spooling cable f/10,227'. 3/23/2022 - Thursday Continue POOH w/ 2-7/8 EUE and ESP pumping double displacement from 10,227 to 8,367'. Found test fluid from pit 4 leaking into KWF causing it to go down. Ship test fluid to tiger tank. move fluid from upright tank to pits. mobilize Bromide to location to weight up KWF. Continue POOH w/ 2-7/8 EUE and ESP from 8,367' to 3900' pumping double displacement. Changed out cable reel. Continue POOH w/2-7/8" ESP Completion f/3900' t/Discharge Head. pumping double displacement. POOH L/d 2-7/8" completion and spooling cable f/10,227'. RIH w/Milling assembly P/u 3-1/2" wk. string f/3460' t/8200' Checking IA static, Pulled BPV/CTS and Tbg was static, P/u landing jt and BOLDS, pulled hanger off seat at 83k to rig floor, PUW=72k. Cut cable and secured to rope. De-complete hanger, found gouge in hanger (possibly a broken lockdown screw) L/d hanger and landing jt. Bring BHA to floor. M/U BHA as per Yellowjacket rep as following: 6 1/8"x4 3/4" Shoe, 5 11/16" Top Sub, XO, 2-4 3/4" Boot Baskets, 4 3/4" Bit Sub, 4 3/4" Bumper, 4 3/4" Oil Jar, 9-4 3/4" Drill Collars and OX to 3 1/2" IF wk string Continue POOH w/ 2-7/8 EUE Continue to POOH w/ 2-7/8 EUE and ESP L/D completion as per Baker rep. Full recovery of clamps, flat guards and protectolizers. P ontinue POOH w/2-7/8" ESP Completion f/3900' t/Discharge Head Continue POOH w/ 2-7/8 EUE and ESP from 8,367' to 3900' RIH w/Milling assembly Rig accepted @ 13:00 3-22-23 Well Name Rig API Number Well Permit Number Start Date End Date MP L-13 ASR#1 50-029-22335-00-00 193-012 3/21/2023 3/29/2023 Hilcorp Alaska, LLC Weekly Operations Summary RIH w/ 3-1/2 work string and test packer from 6,900' to 10,400'. Swivel up. set packer. Packer elements @ 10,408'. MIT-IA. Pressure up to 3700 psi. and hold for 30 min. good test. release packer. Monitor well. break out of joint. Rig down test equipment and blow lines dry. POOH w/ 3-1/2 work string and test packer from 10,408' to surface. While tripping pumped dbl displacement using 10.2ppg Brine every 15jts. L/d 7" Test Packer, P/u Landing joint, retrieved wear bushing. Bucked up landing jt for upcoming L-12 RWO. L/d Landing Jt. Cleaned rig floor, Changeout Handling eq. and prep to RIH, Racked and Tally Completion Jewelry,. P/u and RIH w/4-1/2" completion as following: 4-1/2" WLEG, 1 joint of 4-1/2" DWC 12.6# L-80 Tbg, X- nipple w/RHCP installed, 1 joint of 4-1/2" DWC 12.6# L-80 Tbg, 7"x4 1/2" D@L Hydratrieve Packer, 1 joint of 4-1/2" DWC 12.6# L-80 Tbg, 4 1/2" Viking Sliding Sleeve VXD. RIH w/Completion P/u 4-1/2" DWC 12.6# L-80 Tbg f/222' t/1800' at report time. Continue RIH with 3-1/3 WS and packer burn shoe from 8,200' to 10,452'. Tag packer. Set 10K down. up weight 108K down weight 41K. Rig up Kelly hose. Line up to pump for milling operations. swivel up to joint 254. Get milling parameters. 4,600 ft/lbs free torque @ 80 RPM. pump rate 3.5 BPM @ 660 psi. down weight while rotating 64K. Begin milling on packer. losses are 24 BPH while milling. Added 2 %%gal drums of safe lube to help with torque. Milled 3' and torque came down and with 10K down not making anymore hole. decision was made to POOH and inspect/ change packer shoe. Shut down pumps. Monitor well. well on losses. Break out of the swivel. disconnect kelly hose and blow down all fluid line. prep Equipment for POOH. POOH w/ 3-1/2 work string and Packer burn shoe. f/10,455' t/3389'. Pumping double displacement every 15jts out w/10.2 Brine. Crew Kick while Tripping Drill responds time 38secs. PJSM, crew change, check fluids and serviced rig. POOH w/3-1/2" wk string and milling BHA f/3389' /BHA. Pumping double displacement every 15jts out w/10.2 Brine. PJSM, C/o Handling tools, L/d Milling BHA at report time. 3/25/2022 - Saturday Continue milling on packer. Mill through packer and push to bottom setting packer @10,815'. Reverse circulate 2X BU, 190 BBLs @ 3.5 BPM 650 psi. Losses while pumping reverse 35 BPH. Swivel out of joint. Blow down all fluid lines. prep equipment for POOH. POOH with 3-1/2 WS and packer burn shoe. from 10,815' to 318'. Pumped dbl displacement w/10.2 Brine while tripping. C/o Handling eq. and L/d Drill Collars, Jars, Boot Baskets, Ext and Burn Shoe. C/o handling eq. Rack and Tally 3-1/2" wk. string, Strap and P/u 7" AS1-X Test Packer. RIH w/Test Packer P/u 3-1/2" wk. string t/6,900' at report time. Crew performed well control drill while tripping responds time was 93secs. 3/28/2023 - Tuesday 3/26/2023 - Sunday Finish laying down drill collars. pull BHA to rig floor. found multiple flat guards stuck inside packer shoe. Change out shoe and add 6' extension. P/U BHA including 9 drill collars. RIH w/ 3-1/2 work string and packer burn shoe BHA. f/318' t/9200'. Observed hydraulic fluid leaking from the carriage. Set pipe in slips and secured well. Hydraulic fluid leaking from carriage was contained. Called out mechanic and troubleshot. Found leak coming from carriage motor. R/u man lift, removed service panel to access the backside of carriage. Removed motor and found the motor shaft seal blown out. Installed New Motor. Inspect and Move carriage up and down with no issues. While replacing motor pumped 5bph of 10.2ppg Brine down IA. Continued RIH w/3-1/2" wk string f/9200', tagged perm pkr @ 10,453'. PUW=84k SOW=48k. K/u on Jt 254, pumped 15bbbls and broke circulation, est parameters RPM 85, Rot wt 64k, Free Tq 4300 ft-lbs, began milling on packer @ 03:30hrs, WOB 3-5k, Tq on 50- 5500 ft-lbs cir 2bpm-300psi. Milled off 2' at report time. 24bph losses. 3/27/2023 - Monday Continue RIH with 3-1/3 WS and packer burn shoe from 8,200' to 10,452'. Tag packer. Set 10K down. POOH w/3-1/2" wk string and milling BHA f/3389' /BHA RIH w/ 3-1/2 work string and test packer from 6,900' to 10,400'. Swivel up. set packer. Packer elements @ 10,408'. MIT-IA. Pressure up to 3700 psi. and hold for 30 min. good test. release packer Continued RIH w/3-1/2" wk string f/9200', tagged perm pkr @ 10,453'. P/u and RIH w/4-1/2" completion as following: 4-1/2" WLEG, 1 joint of 4-1/2" DWC 12.6# L-80 Tbg, X- nipple w/RHCP installed, 1 joint of 4-1/2" DWC 12.6# L-80 Tbg, 7"x4 1/2" D@L Hydratrieve Packer, 1 joint of 4-1/2" DWC 12.6# L-80 Tbg, 4 1/2" Viking Sliding Sleeve VXD. RIH w/Completion P/u 4-1/2" DWC 12.6# L-80 Tbg f/222' t/1800 RIH w/ 3-1/2 work string and packer burn shoe BHA. f/318' t/9200'. Continue milling on packer. Mill through packer and push to bottom setting packer @10,815' Begin milling on packer. losses are 24 BPH while milling. Added 2 %%gal drums of safe lube to help with torque began milling on packer @ 03:30hrs, WOB 3-5k, Tq on 50- 5500 ft-lbs cir 2bpm-300psi. Milled off 2' at report time. Well Name Rig API Number Well Permit Number Start Date End Date MP L-13 ASR#1 50-029-22335-00-00 193-012 3/21/2023 3/29/2023 No operations to report. No operations to report. 4/1/2022 - Saturday No operations to report. 4/4/2023 - Tuesday 4/2/2023 - Sunday No operations to report. 4/3/2023 - Monday 3/31/2022 - Friday No operations to report. 3/29/2022 - Wednesday Hilcorp Alaska, LLC Weekly Operations Summary Cont. RIH w/ 4-1/2" DWC 12.6# L-80 Completion F /1,800' T/ 5,650'. Service Rig, Check equip fluid levels. Cont. RIH w/ 4-1/2" DWC 12.6# L-80 Completion F / 5,650' T/ 10,304'. M/U space out pups, 1 full JT & hanger. P/U WT = 97K S/O WT = 57K. Land hanger RILDS, Wleg set at 10,390'. Transfer fluid from upright to LRS for CI brine & freeze protect to reverse in. LRS pumped 10 bbls 1% CI 10.2 ppg brine chased w/ 130 bbls of 10.2 ppg brine. Followed by 55 bbls of diesel freeze protect. Reversed in at 3 bpm 540 psi max observed, w/ 53 BPH loss rate. Shut down. Monitor well. Static, open blinds. Engage landing JT to hanger. Drop 1.875" ball & rod. Remove landing JT, Allow To fall. Rig up to pressure up to set hydraulic set PKR. Pressure up to 4,000psi to set PKR, hold for 25 mins, Preform MIT of tubing to 3,000 psi F/ 30 charted min. (good) Bleed tubing to 1000 psi, Pressure up IA to 3600 PSI F/ 30 charted mins. Shut down 2x & replace 2x high psi soft lines due to pin holes. Resume testing. (good). R/D pump lines & blow down. P/U tee bar. Set BPV. L/D wellhead equipment. Begin RD. 3/30/2022 - Thursday No operations to report. Drop 1.875" ball & rod. Remove landing JT, Allow To fall. Rig up to pressure up to set hydraulic set PKR. Pressure up to 4,000psi to set PKR, hold for 25 mins, Preform MIT of tubing to 3,000 psi F/ 30 charted min. (good) Bleed tubing to 1000 psi, Pressure up IA to 3600 PSI F/ 30 charted mins. Shut down 2x & replace 2x high psi soft lines due to pin holes. Resume testing. (good). Cont. RIH w/ 4-1/2" DWC 12.6# L-80 Completion M/U space out pups, 1 full JT & hanger Cont. RIH w/ 4-1/2" DWC 12.6# L-80 Completion MGR20MAR23 * BOPE test to 3000 psi. Annular to 2500 psi. 10-404 JLC 3/20/2023 3/21/23 Gregory Wilson Digitally signed by Gregory Wilson Date: 2023.03.21 08:44:45 -08'00' RBDMS JSB 032123 2.24.2023 By Samantha Carlisle at 10:32 am, Feb 27, 2023 323-111 Digitally signed by Monty M Myers DN: cn=Monty M Myers, c=US, o=Hilcorp Alaska, LLC, ou=Technical Services - AK Drilling, email=mmyers@hilcorp.com Reason: I am approving this document Date: 2023.02.24 22:33:04 -09'00' Monty M Myers MGR03MAR23 DSR-2/27/23SFD 2/28/2023 10-407 * Variance to 20 AAC 25.112(i) Alternate plug placement approved with fully cemented liner post CTD. * Separate sundry required to configure well for production. * BOPE test to 3500 psi. GCW 03/07/23JLC 3/7/2023 3/7/23 Brett W. Huber, Sr. Digitally signed by Brett W. Huber, Sr. Date: 2023.03.07 12:17:11 -09'00' RBDMS JSB 030923 To: Alaska Oil & Gas Conservation Commission From: Sean McLaughlin CTD Engineer Date: February 24, 2023 Re: MPL-13 Sundry Approval Request Sundry approval is requested to plug off the MPL-13 production as part of the preparation, drilling and completing the proposed MPL-13A coiled tubing sidetrack. Proposed plan for MPL-13A: A RWO will be conducted independently of the drilling operation to install a 4-1/2” completion. The whipstock will be set pre-rig in the 7” casing. The CDR2 rig will move in, test BOPE and kill the well. The well will kick off in the Kuparuk, build through the C and B intervals to land in the A sands. A ~2,625’ coil tubing drilling sidetrack will be drilled in the A sands. The sidetrack will be completed with a 3-1/2” x 3-1/4” x 2-7/8” L80 solid liner, cemented in place and selectively perforated post rig. This completion will completely isolate and abandon the parent perforations. The following describes the work planned. A wellbore schematic of the current well and proposed sidetrack is attached for reference. Pre-Rig Work (scheduled to begin March, 2023) 1.Tubing swap (conducted under separate sundry) 2.Set 7” Whipstock 3.Pre-CTD Tree work. Rig Work (scheduled to begin April 2023) 1. MIRU and test BOPE 250 psi low and 3,500 psi high (MASP: 3017 psi). 2. Mill single string window @10535’ 3. Drill build section: 4.25" OH, ~325' (25 deg DLS planned). 4. Drill lateral section: 4.25” OH, ~2300’ (12 deg DLS planned). 5. Swap BOP rams from 3” pipe/slip (drilling) to 2-3/8”x3-1/2” VBRs (running liner) and test to 3500 psi. 6. Run 2-7/8” x 3-1/4” x 3-1/2” L-80 liner to TD. 7. Pump primary cement job: 37 bbls, 15.3 ppg Class G, TOC at TOL (~10,360 MD).* 8. Perforate ~1500. 9. Close in tree, RDMO. * Approved alternate plug placement per 20 AAC 25.112(i) Post-Rig Work: 1. V: Valve & tree work 2. S: Set LTP* (if necessary). 3. T: Portable test separator flowback. Sean McLaughlin CC: Well File CTD Engineer Joe Lastufka 223-6784 Separate sundry required to configure well for production. Sundry 323-111 Separate PTD _____________________________________________________________________________________ Revised By TDF: 2/6/2023 PROPOSED Milne Point Unit Well: MPU L-13 Last Completed: 12/13/2013 PTD: 193-012 TD =11,016’ (MD) / TD = 7,409’(TVD) 20” Orig. KB Elev.:46’/ Orig. GL Elev.: 16.5’ Nabors 22E / RT to 7”Hanger= 28.5’ 7” 9-5/8” 1 PBTD = 10,868’(MD) / PBTD = 7,311’(TVD) KUP B Sands KUP A Sands 2 3 4 CASING DETAIL Size Type Wt/ Grade/ Conn ID Top Btm 13-3/8" Conductor 54.5 / K-55 / BTRC 12.415 Surface 80' 9-5/8" Surface 47 / N-80 / BTRS 8.681 Surface 6,086’ 7" Production 26 / L-80 / BTRC 6.276 Surface 10,996’ TUBING DETAIL 4-1/2" Tubing 12.6 / L-80 / EUE 8rd 3.958 Surface ±10,390’ JEWELRY DETAIL No Depth Item 1 ±10,180’ Sliding Sleeve 2 ±10,250’ Packer 3 ±10,290’ XN Nipple 4 ±10,388’ WLEG: Bottom @ ±10,390’ PERFORATION DETAIL Sands Top (MD) Btm (MD) Top (TVD) Btm (TVD) FT Date Status Kuparuk 10,498’ 10,518’ 7,072’ 7,084’ 20 5/10/1993 Open 10,529’ 10,539’ 7,091’ 7,098’ 10 5/10/1993 Open 10,554’ 10,564’ 7,107’ 7,113’ 10 5/10/1993 Open 10,598’ 10,618’ 7,135’ 7,148’ 20 5/10/1993 Open 10,626’ 10,656’ 7,153’ 7,172’ 30 5/10/1993 Open 10,669’ 10,719’ 7,180’ 7,213’ 50 5/10/1993 Open 4.5” Guns 12SPF OPEN HOLE / CEMENT DETAIL 13-3/8”" 300 sx of Arcticset I in 26” Hole 9-5/8" 1,780 sx of Arcticset III, 3000 sx Class ‘G’ in 12-1/4” Hole 7” 325 sx Class “G” in 8-1/2” Hole WELL INCLINATION DETAIL KOP @ 500’ Max Hole Angle = 54.5 deg. @ 3,811’ MD TREE & WELLHEAD Tree 2-9/16” – 5M WKM Wellhead 11” 5M WKM, w/ 2-7/8” x 11” Tubing Hanger, 2-7/8” EUE 8rd Threads, 2.5” “H” BPV profile. GENERAL WELL INFO 50-029-22335-00-00 Drilled and Cased by Nabors 22E - 5/16/1993 ESP Change-out by Nabors 4ES – 2/22/1995, 11/17/1999 & 8/3/2003 ESP Change-out by Nabors 3S – 1/27/2008 & 6/14/2008 ESP Change-out by Doyon 16 – 12/12/2013 STIMULATION DETAIL Frac - 41,146# of 16/20 Carbolite behind pipe _____________________________________________________________________________________ Revised By JNL: 2/6/2023 PROPOSED Milne Point Unit Well: MPU L-13 Last Completed: 12/13/2013 PTD: 193-012 PERFORATION DETAIL Sands Top (MD) Btm (MD) Top (TVD) Btm (TVD) FT Date Status Kuparuk 10,498’ 10,518’ 7,072’ 7,084’ 20 5/10/1993 Open 10,529’ 10,539’ 7,091’ 7,098’ 10 5/10/1993 Open 10,554’ 10,564’ 7,107’ 7,113’ 10 5/10/1993 Open 10,598’ 10,618’ 7,135’ 7,148’ 20 5/10/1993 Open 10,626’ 10,656’ 7,153’ 7,172’ 30 5/10/1993 Open 10,669’ 10,719’ 7,180’ 7,213’ 50 5/10/1993 Open 4.5” Guns 12SPF GENERAL WELL INFO 50-029-22335-00-00 Drilled and Cased by Nabors 22E - 5/16/1993 ESP Change-out by Nabors 4ES – 2/22/1995, 11/17/1999 & 8/3/2003 ESP Change-out by Nabors 3S – 1/27/2008 & 6/14/2008 ESP Change-out by Doyon 16 – 12/12/2013 TD =11,016’ (MD) / TD = 7,409’(TVD) 20” Orig. KB Elev.:46’/ Orig. GL Elev.: 16.5’ Nabors 22E / RT to 7”Hanger= 28.5’ 7” 5 9-5/8” 1 Whipstock set @10530’ PBTD = 10,868’(MD) / PBTD = 7,311’(TVD) KUP B Sands KUP A Sands 2 3 4 CASING DETAIL Size Type Wt/ Grade/ Conn ID Top Btm 13-3/8" Conductor 54.5 / K-55 / BTRC 12.415 Surface 80' 9-5/8" Surface 47 / N-80 / BTRS 8.681 Surface 6,086’ 7" Production 26 / L-80 / BTRC 6.276 Surface 10,996’ TUBING DETAIL 4-1/2" Tubing 12.6 / L-80 / EUE 8rd 3.958 Surface ±10,390’ JEWELRY DETAIL No Depth Item 1 ±10,180’ Sliding Sleeve 2 ±10,250’ Packer 3 ±10,290’ XN Nipple 4 ±10,388’ WLEG: Bottom @ ±10,390’ 5 10,530’ Whipstock OPEN HOLE / CEMENT DETAIL 13-3/8”" 300 sx of Arcticset I in 26” Hole 9-5/8" 1,780 sx of Arcticset III, 3000 sx Class ‘G’ in 12-1/4” Hole 7” 325 sx Class “G” in 8-1/2” Hole WELL INCLINATION DETAIL KOP @ 500’ Max Hole Angle = 54.5 deg. @ 3,811’ MD TREE & WELLHEAD Tree 2-9/16” – 5M WKM Wellhead 11” 5M WKM, w/ 2-7/8” x 11” Tubing Hanger, 2-7/8” EUE 8rd Threads, 2.5” “H” BPV profile. STIMULATION DETAIL Frac - 41,146# of 16/20 Carbolite behind pipe _____________________________________________________________________________________ Revised By JNL: 2/15/2023 PROPOSED SCHEMATIC Milne Point Unit Well: MPU L-13A Last Completed: TBD PTD: TBD CASING DETAIL Size Type Wt/ Grade/ Conn ID Top Btm 13-3/8" Conductor 54.5 / K-55 / BTRC 12.415 Surface 80' 9-5/8" Surface 47 / N-80 / BTRS 8.681 Surface 6,086’ 7" Production 26 / L-80 / BTRC 6.276 Surface 10,535’ 3-1/2”x3-1/4”x2-7/8” Liner 9.3 x 6.6 x 6.5 / L-80 / STL x TCII 10,360’ 13,159’ TUBING DETAIL 4-1/2" Tubing 12.6 / L-80 / EUE 8rd 3.958 Surface 10,390’ JEWELRY DETAIL No Depth Item 1 10,180’ Sliding Sleeve 2 10,250’ Packer 3 10,290’ XN Nipple 4 10,360’ Top 3-1/2” Liner 5 10,388’ WLEG: Bottom @ 10,390’ 6 10,510’ 3-1/2” xo 3-1/4” 7 10,775’ 3-1/4” xo 2-7/8” PERFORATION DETAIL Sands Top (MD) Btm (MD) Top (TVD) Btm (TVD) FT Date Status Kuparuk GENERAL WELL INFO API: 50-029-22335-01-00 Drilled and Cased by Nabors 22E - 5/16/1993 ESP Change-out by Nabors 4ES – 2/22/1995, 11/17/1999 & 8/3/2003 ESP Change-out by Nabors 3S – 1/27/2008 & 6/14/2008 ESP Change-out by Doyon 16 – 12/12/2013 A Sidetrack:TD =13,159’ (MD) / TD =7,199’(TVD) 20” Orig. KB Elev.:46’/ Orig. GL Elev.: 16.5’ Nabors 22E / RT to 7”Hanger= 28.5’ 7” 6 3-1/2”xo 3-1/4” @ 10510’ 9-5/8” 1 3-1/4xo 2-7/8” @ 10775’ 2-7/8” PBTD = 13,159’(MD) / PBTD =7,199’(TVD) Whipstock set @ 10530’ Top of Window @ 10535’ 5 7 Top of Liner / Cement @ 10360’ 2 3 4 OPEN HOLE / CEMENT DETAIL 26” 300 sx of Arcticset I 12-1/4” 1,780 sx of Arcticset III, 3000 sx Class G 8-1/2” 325 sx Class G” 4-1/4” 168 sx Classs G WELL INCLINATION DETAIL KOP @ 10535’ 90 deg Hole Angle = 11075’ MD TREE & WELLHEAD Tree 2-9/16” – 5M WKM Wellhead 11” 5M WKM, w/ 2-7/8” x 11” Tubing Hanger, 2-7/8” EUE 8rd Threads, 2.5” “H” BPV profile. Well Date Quick Test Sub to Otis -1.1 ft Top of 7" Otis 0.0 ft Distances from top of riser Excluding quick-test sub Top of Annular 2.75 ft C L Annular 3.40 ft Bottom Annular 4.75 ft CL Blind/Shears 6.09 ft CL 2.0" Pipe / Slips 6.95 ft B3 B4 B1 B2 Kill Line Choke Line CL 2-3/8" Pipe / Slip 9.54 ft CL 2.0" Pipe / Slips 10.40 ft TV1 TV2 T1 T2 Flow Tee Master Master LDS IA OA LDS Ground Level 3" LP hose open ended to Flowline CDR2-AC BOP Schematic CDR2 Rig's Drip Pan Fill Line from HF2 Normally Disconnected 3" HP hose to Micromotion Hydril 7 1/16" Annular Blind/Shear 2-3/8" Pipe/Slips 2 3/8" Pipe/Slips 2 3/8" Pipe/Slips 7-1/16" 5k Mud Cross 2-3/8" Pipe/Slips 3.0" Pipe / Slip HF nneceeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeee Samuel Gebert Hilcorp Alaska, LLC GeoTech Assistant 3800 Centerpoint Drive, Suite 1400 Anchorage, AK 99503 Tele: 907 777-8337 Fax: 907 777-8510 E-mail: sam.gebert@hilcorp.com Please acknowledge receipt by signing and returning one copy of this transmittal or FAX to 907 777.8510 Received By: Date: DATE: 10/13/2020 To: Alaska Oil & Gas Conservation Commission Natural Resource Technician 333 W 7th Ave Suite 100 Anchorage, AK 99501 DATA TRANSMITTAL MPU L-13 (PTD 193-012) Multi Finger Caliper Log 06/05/2020 ANALYSIS FIELD DATA Please include current contact information if different from above. PTD: 1930120 E-Set: 34076 Received by the AOGCC 10/13/2020 Abby Bell 10/14/2020 STATE OF • ALr,SKA OIL AND GAS CONSERVATION COiviMISSION REPORT OF SUNDRY WELL OPERATIONS ,/\',1 0 9 2314 1. Operations Performed: AOGCC ❑Abandon 0 Repair Well 0 Plug Perforations 0 Perforate 0 Re-Enter Suspended Well ❑Alter Casing IN Pull Tubing 0 Stimulate-Frac 0 Waiver 0 Other ❑Change Approved Program 0 Operation Shutdown 0 Stimulate-Other 0 Time Extension Change out ESP 2. Operator Name: 4. Well Class Before Work: 5. Permit To Drill Number: BP Exploration(Alaska) Inc. 0 Exploratory 0 Stratigraphic • 193-012 3. Address: 0 Development 0 Service 6. API Numbe P.O. Box 196612,Anchorage,Alaska 99519-6612 • 50-029-22335-00-00 7. Property Designation(Lease Number): 8. Well Name and Number: • ADL 025509 t MPL-13 9. Logs(list logs and submit electronic and printed data per 20AAC25.071): 10.Field/Pool(s): Milne Point Unit/Kuparuk River Sands _ 11. Present well condition summary: Total depth: measured olik 11016' feet Plugs:(measured) 10490' feet true vertical 7409' feet Junk:(measured) None feet Effective depth: measured 4 10898' feet Packer: (measured) 10453' feet true vertical 7331' feet Packer: (true vertical) 704' feet Casing Length Size MD ND Burst Collapse Structural Conductor 110' 13-3/8" 110' 110' 2730 1130 Surface 6086' 9-5/8" 6086' 4409' 6870 4760 Intermediate Production 10996' 7" 10996' 7396' 7240 5410 Liner CLONED J U L 1. 6 2014 Perforation Depth: Measured Depth: 10498'-10719' feet True Vertical Depth: 7072'-7213' feet Tubing(size,grade,measured and true vertical depth): 2-7/8",6.5#/ L-80 10227'/ 6905'/ 3-1/2"tailpipe 10453'- 10493' 7044'-7069' Packers and SSSV(type,measured and true vertical depth): 7 Baker Model'D'Perm Pkr with 20'of 10453' 7044' 20 Gage screen and tailpipe 12.Stimulation or cement squeeze summary: Intervals treated(measured): RBDM4 MAY 16 2014 Treatment description including volumes used and final pressure: 13 Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure - Prior to well operation: 80 75 505 220 199 Subsequent to operation: 216 56 1267 220 199 14.Attachments: ❑Copies of Logs and Surveys run 15.Well Class after work: 0 Exploratory 0 Stratigraphic`0 Development 0 Service 0 Daily Report of Well Operations 16. Well Status after work: .IS Oil 0 Gas 0 WDSPL 0 Well Schematic Diagram 0 GSTOR 0 WINJ 0 WAG 0 GINJ 0 SUSP 0 SPLUG 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O.Exempt: Contact: J.E.B.Bolen,564-5110 Email: J.E.B.Bolen@bp.com N/A Printed Name: Joe Lastu Title: Drilling Technologist Signature: j, Y hone: 564-4091 Date:(j a it Form 10-404 Revised 10/2012 /jy Submit Original Only vz �-F 5/z4/� A r14Z North America-ALASKA-BP Page 1 of 11 Operation Summary Report Common Well Name:MPL-13 AFE No Event Type:WORKOVER(WO) Start Date:12/6/2013 End Date:12/13/2013 X4-00YCQ-E:(1,600,000.00) Project:Milne Point Site:M Pt L Pad Rig Name/No.:DOYON 16 Spud Date/Time:4/23/1993 12:00:00AM Rig Release:12/13/2013 Rig Contractor DOYON DRILLING INC. UWI:500292233500 Active datum:ORIG KELLY BUSHING @36.00usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 12/6/2013 13:00 - 14:00 1.00 MOB P PRE PREP FOR RIG MOVE -FUNCTION TEST MOVING SYSTEM AND ESD 14:00 - 18:00 4.00 MOB P PRE PJSM,MOVE OFF OF MPL-091 -STAGE WELLHEAD EQUIPMENT IN CELLAR MOVE RIG AROUND PAD AND SPOT OVER MPL-13 18:00 - 19:00 1.00 MOB P PRE SHIMANDBURMAROUNDCELLARANDSUB STRUCTURE -PREP PITS FOR FLUID -START TAKING ON SEAWATER -SPOT CUTTINGS BOX,CREW AND FUEL TRAILERS RIG ACCEPTED AT 19:00 19:00 - 21:00 2.00 RIGU P DECOMP RIG UP CIRC MANIFOLD -R/U LINES IN CELLAR -VALVE CREW R/U HARDLINE TO FLOW BACK TANK IA=700 PSI OA=0 PSI 21:00 - 22:30 1.50 RIGU P DECOMP STEAM AND CLEAR LINES TO FLOW BACK TAN K -PT ALL CIR LINES,250 PSI,3500 PSI,5 MINUTES EACH 22:30 - 23:30 1.00 RIGU P DECOMP CHANGEOUT 2"HP HOSE -C/O CIRC HOSE -RETEST,250 PSI,3500 PSI,5 MINUTES EACH 23:30 - 00:00 0.50 RIGU P DECOMP HOLD RIG EVAC DRILL AND AAR -ALL PERSONEL ON LOCATION RESPONDED PROPERLY AND EFFICIENTLY 12/7/2013 00:00 - 02:30 2.50 WHSUR P DECOMP PJSM,R/U DSM LUBRICATOR AND TOOLS -TEST,250 PSI,3500 PSI,5 MIN,CHART -PULL BPV,475 PSI ON TUBING -R/U DSM LUBRICATOR,INSTALL TREE CAP -TEST TREE CAP,250/3500 PSI,5 MIN, CHART Printed 1/9/2014 2:15:25PM North America-ALASKA �� Page 2 of 11 Operation Summary Reports Common Well Name:MPL-13 AFE No Event Type:WORKOVER(WO) Start Date:12/6/2013 End Date:12/13/2013 X4-00YCQ-E:(1,600,000.00) Project:Milne Point Site:M Pt L Pad Rig Name/No.:DOYON 16 Spud Date/Time:4/23/1993 12:00.00AM Rig Release:12/13/2013 Rig Contractor DOYON DRILLING INC. UWI:500292233500 Active datum:ORIG KELLY BUSHING @36.00usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 02:30 07:00 4.50 KILLW P DECOMP PJSM,WELL KILL OPERATIONS -MAKE PROPER NOTIFICATIONS TO PAD OPS,SECURITY,AND WTL,FOR BLEEDING GAS,SECURE LOCATION -TUBING=500 PSI,IA=800 PSI -BLEED 800 PSI GAS OFF OF IA TO 0 PSI -PUMP 120 DEGREE 8.5 SEAWATER DOWN TUBING,3 BPM=550 PSI,TAKE RETURNS TO FLOW BACK TANK BEGAN GETTING FLUID RETURNS AT 15 BBLS PUMPED PUMP TOTAL OF 59 BBLS DOWN TUBING, CLOSE IA BULLHEAD 27 BBLS TO FORMATION,FINAL BULLHEAD PRESSURE=1150 PSI SHUT IN,ALLOW FORMATION TO BLEED DOWN -PUMP 486 BBLS 8.5 SEAWATER DOWN TUBING,TAKE CRUDE RETURNS FROM IA TO FLOW BACK TANK MONITOR WELL 30 MIN.WELL WENT ON VAC AFTER 25 MIN. SENT 290 BBLS CRUDE TO MPU RECYCLE FOR RECOVERY. 07:00 - 08:00 1.00 KILLW P DECOMP PJSM,RIG DOWN MANIFOLD -BLOW DOWN LINES -RIG DOWN CIRCULATING LINES&KILL MANIFOLD -R/U SECONDARY KILL LINE 08:00 - 09:30 1.50 WHSUR P WHDTRE PJSM WITH WELL SUPPORT AND RIG CREW TO SET TWC -M/U LUBRICATOR&TEST 250 PSI LOW AND 3500 PSI LOW FOR 5 MINS EACH,CHARTED -SET TWC -LAY DOWN LUBRICATOR 09:30 - 10:30 1.00 WHSUR P WHDTRE PRESSURE TEST TWC -PERFORM ROLLING TEST BELOW TWC -PUMP DOWN IA©9 BPM AND 500 PSI FOR 10 MINS,CHARTED(147 BBLS KWF PUMPED) -TEST TWC FROM ABOVE:250 PSI LOW& 3500 PSI HIGH FOR 5 MINS EACH,CHARTED -AOGCC,LOU GRIMALDI WAIVED STATES RIGHT OF WITNESS BOP TEST -MAINTAIN HOLE FILL TO IA AT 20 BPH WITH 8.5 PPG SEAWATER. 10 30 - 12.00 1.50 WHSUR P WHDTRE PJSM TO DRAIN AND NIPPLE DOWN TREE& N/U BOPE NIPPLE DOWN CAMERON ADAPTER FLANGE & 2 9/16",5 M TREE -FMC REP CLEAN AND INSPECT EUE 8RD HANGER THREADS -CONFIRM 9 TURNS BY HAND. 12:00 - 16:00 4.00 BOPSUR P DECOMP PJSM,NIPPLE UP BOPE -N/U 13-5/8"BOPE STACK. -INSTALL TURNBUCKLES AND FLOW NIPPLE. -RE-ENERGIZE ACCUMULATOR SYSTEM. -PREP RIG FLOOR WITH 2 7/8"AND 4"TEST EQUIPMENT. -SPOT AND R/U ESP SPOOLING UNIT Printed 1/9/2014 2:15.25PM North America-ALASKA-BP Page 3 of 11 Operation Summary Report Common Well Name:MPL-13 AFE No Event Type:WORKOVER(WO) Start Date:12/6/2013 • End Date:12/13/2013 X4-00YCQ-E:(1,600,000.00) Project:Milne Point Site:M Pt L Pad Rig Name/No.:DOYON 16 Spud Date/Time:4/23/1993 12:00:00AM Rig Release:12/13/2013 Rig Contractor:DOYON DRILLING INC. WA:500292233500 Active datum:ORIG KELLY BUSHING @36.00usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 16:00 - 18:00 2.00 BOPSUR P DECOMP CLEAN AND SECURE CELLAR AREA R/U BOP TEST EQUIPMENT -R/U CONTSANT FILL LINE TO IA -RIG MECHANIC AND ELECTRICIAN SERVICE AND INSPECT,FUNCTION TEST KOOMEY 18:00 - 00:00 6.00 BOPSUR P DECOMP TEST FOUR PREVENTER 13-5/8"BOP AND RELATED EQUIPMENT. TEST BOP ACCORDING TO AOGCC REGULATIONS AND DOYON PROCEDURES. -ATTEMPT TEST ANNULAR WITH 2 7/8"TEST JOINT TO 250 PSI LOW,3500 PSI HIGH,5 MINUTES EACH,CHARTED. -TEST 2-7/8"X 5"VARIABLE RAMS WITH 2 7/8" AND 4"TEST JOINT,250 PSI,3500 PSI,5 MIN, CHARTED. -TEST BLIND RAMS,FLOOR VALVES,AND CHOKE MANIFOLD TO 250 PSI,3500 PSI,5 MIN,CHARTED. -TEST WITH FRESH WATER. -ANNULAR TEST FAILED.WILL CHANGE OUT AND RE-TEST -LOU GRIMALDI OF AOGCC WAIVED STATES RIGHT OF WITNESS TO BOPE TEST,6:15 12/06/13 ! -OA=0 PSI -24 HOUR FLUID LOSS=312 BBLS 8.5 PPG SEAWATER -MAINTAIN CONTINUOUS HOLE FILL TO IA= 19BPH8.5PPGSEAWATER 12/8/2013 00:00 - 02:00 2.00 BOPSUR P DECOMP CONT.TEST FOUR PREVENTER 13-5/8"BOP AND RELATED EQUIPMENT. -TEST 2-7/8"X 5"VARIABLE RAMS WITH 2 7/8" AND 4"TEST JOINT,250 PSI,3500 PSI,5 MIN, CHARTED. -TEST BLIND RAMS,FLOOR VALVES,AND CHOKE MANIFOLD TO 250 PSI,3500 PSI,5 MIN,CHARTED. -TEST WITH FRESH WATER. -PERFORM ACCUMULATOR DRAW DOWN TEST. -ANNULAR TEST FAILED,WILL CHANGE OUT AND RE-TEST -LOU GRIMALDI OF AOGCC WAIVED STATES RIGHT OF WITNESS TO BOPE TEST,6:15 _ 12/06/13 02:00 - 02:30 0.50 BOPSUR P DECOMP UD TEST JOINT,R/D FLOOR VALVES -BLOW DOWN TEST CHOKE AND KILL LINES, DRAIN BOPE 02:30 - 08:30 6.00 BOPSUR N RREP DECOMP PJSM,CHANGE OUT ANNULAR ELEMENT -R/U TOOLS AND EQUIPMENT IN CELLAR, LADDERS AND FALL ARRESTORS -REMOVE ANNULAR TOP CAP AND ELEMENT -INSPECT AND CLEAN INSIDE ANNULAR • BODY -INSTALL NEW ELEMENT Printed 1/9/2014 2:15:25PM North America-ALASKA-BP Page 4 of 11 Operation Summary Report Common Well Name:MPL-13 AFE No Event Type:WORKOVER(WO) Start Date:12/6/2013 End Date:12/13/2013 X4-00YCQ-E:(1,600,000.00) Project:Milne Point Site:M Pt L Pad Rig Name/No.:DOYON 16 Spud Date/Time:4/23/1993 12:00:00AM Rig Release:12/13/2013 Rig Contractor:DOYON DRILLING INC. UWI:500292233500 Active datum:ORIG KELLY BUSHING @36.00usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 08:30 - 09:30 1.00 BOPSUR P DECOMP PJSM,RU AND TEST NEW ANNULAR ELEMENT -TEST ANNULAR 250/3500 PSI FOR 5 CHARTED MIN.EACH.PASSED. 09:30 - 10:00 0.50 BOPSUR P DECOMP RIG DOWN ALL TEST EQUIPMENT. -DRAIN STACK.B/D ALL LINES 10:00 - 12:00 2.00 WHSUR P DECOMP PJSM,P/U AND R/U DSM LUBRICATOR/ OFFSET EXTENSION. -FILL BOP STACK WITH 8.5 PPG KWF. -CLOSE ANNULAR AND PRESSURE TEST T/ 250/3500 PSI AND CHART F/5 MINUTES 'EACH. -PULL TWC AND R/D DSM LUBRICATOR AND EXTENSION. 12:00 - 12:30 0.50 PULL P DECOMP SERVICE RIG FLOOR HANDLING EQUIPMENT. -DRAIN BOP STACK AND PREP TO PULL TBG HANGER. 12:30 - 13:00 0.50 PULL P DECOMP PJSM ON PULLING 2 7/8"TBG HANGER TO FLOOR. -WSL,TOOLPUSHER,CAMERON REP, CENTRALIFT REP, RIG CREW IN ATTENDANCE. -DISCUSSED WELL CONTROL,CONTINUOUS HOLE FILL,DISCONNECTING ESP CABLE FROM PENETRATER. 13:00 - 14:30 1.50 PULL P DECOMP MU 2-7/8"EUE LANDING JOINT WITH FOSV TO TBG HANGER.BOLDS PER CAMERON REP. -WSL VERIFY NO TRAPPED PRESSURE UNDER TBG HANGER. -PULL TBG HANGER OFF SEAT @ 125K INCLUDES 40K TOP DRIVE WT. -MAX PULL 125K INCLUDES TOP DRIVE WT. -PUW=110K,SOW=83K -PULL HANGER AND REMOVE FLAT GUARDS /BANDS AND TWO PUP JTS BENEATH HANGER AND FIRST FULL JT. -CUT ESP CABLE PER CENTRALIFT REP. -POSITION SLICK JOINT ACROSS BOPE. 14:30 - 17:00 2.50 PULL P DECOMP PJSM, FILL HOLE.CLOSE ANNULAR -ESTABLISHED CIRCULATION 2 BPM @ 260 PSI. -PUMPED 40 BBL DEEP CLEAN PILL SURFACE TO SURFACE THROUGH RIG CHOKE/GAS BUSTER. -PUMP RATE=3-5 BPM©480 TO 650 PSI. -REMOVE PENETRATER PER CENTRILIFT REP. -HANG ESP SHEAVE AND ELEPHANT TRUNK IN DERRICK. MONITOR WELL,LOSS RATE=9 BPH • 17:00 - 17:30 0.50 PULL P DECOMP BLOW DOWN CHOKE AND KILL LINES -LINE UP ON HOLE FILL PULL R/U ESP CABLE TO SPOOLING UNIT Printed 1/9/2014 2:15:25PM North America-ALASKA-BP Page 5 of 11 Operation Summary Report Common Well Name:MPL-13 AFE No Event Type:WORKOVER(WO) Start Date:12/6/2013 End Date:12/13/2013 X4-00YCQ-E:(1,600,000.00) Project:Milne Point Site:M Pt L Pad Rig Name/No.:DOYON 16 Spud Date/Time:4/23/1993 12:00:00AM Rig Release:12/13/2013 Rig Contractor:DOYON DRILLING INC. UWI:500292233500 Active datum:ORIG KELLY BUSHING @36.00usft(above Mean Sea Level) Date I From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 17:30 - 00:00 6.50 PULL P DECOMP PJSM,PULL 2 7/8"6.5#L-80 EUE 8RD ESP COMPLETION,STAND BACK IN DERRICK -FROM 10298'TO 5210'MD -OA=0 PSI 1-LOSS RATE=9 BPH -24 HOUR FLUID LOSS=273 BBLS 8.5 PPG SEAWATER 12/9/2013 00:00 - 04:30 4.50 PULL P DECOMP PJSM,PERFORM SPCC CHECKS,CHECK C.O.M. -PJSM,PULL 2 7/8"6.5#L-80 EUE 8RD ESP COMPLETION,STAND BACK IN DERRICK -FROM 5210'MD TO ESP PUMP AND MOTOR ASSY -HOLD KICK WHILE TRIPPING DRILL AND AAR -MONITOR WELL BEFORE PULLING BHA TO RIG FLOOR 04:30 - 07:30 3.00 PULL P DECOMP L/D ESP MOTOR AND PUMP ASSY AND MONITOR WELL. -CENTRALIFT REP DETERMINED THE ESP PUMP HAD A TWISTED SHAFT. -PUMP WAS LOCKED UP AND PARTIALLY PLUGGED. -MOTOR EXPERIENCED SEAL FAILURES WITH GAS,WATER,AND CRUDE CONTAMINATION. -SUSPECTED ESP CABLE DAMAGE.WILL BE RETURNED FOR INSPECTION. -OVER-ALL CONDITION OF 2 7/8"8RD EUE L-80 TBG GOOD.XN NIPPLE IS 2.25"NO GO. 07.30 - 08'00 0 50 PULL P DECOMP PJSM,RIG DOWN ESP SHEAVE AND TRUNK RIG CREW DISCUSSED ICE IN DERRICK. -RIG DOWN ESP SHEAVE FROM DERRICK STORE ELEPHANT TRUNK 08:00 - 09:00 1.00 PULL P DECOMP CLEAN AND CLEAR RIG FLOOR. LAY DOWN CENTRALIFT EQUIPMENT. COUNT AND LAY DOWN LASALLE CLAMPS. OA=O PSI. CLAMPS RECOVERED: LASALLE=158 PROTECTOLIZERS=4 FLAT GUARDS=3 09:00 - 09:30 0.50 DHB P DECOMP INSTALL WEAR RING. -PU RUNNING TOOL AND INSTALL 6 3/8" WEAR RING.LD RUNNING TOOL. 09:30 - 12:00 2.50 DHB P DECOMP PJSM,PU AND MU HES RBP PER HES REP. -MUHES7"RBPANDRIHON27/8"TBG FROM DERRICK. 12:00 - 12:30 0.50 DHB P DECOMP SERVICE TOP DRIVE. -SERVICE FLOOR EQUIPMENT. 12:30 - 15:30 3.00 DHB P DECOMP PJSM,RIH FROM DERRICK -CONTINUE RIH WITH HES RPB ON TBG FROM 965'MD.TO 5044'MD. -OBTAIN PARAMETERS.PU WT.=63K SO WI.=60K,INCLUDING 40K BLK WT. Printed 1/9/2014 2.15:25PM North America-ALASKA-BP Page 6 of 11 Operation Summary Report Common Well Name:MPL-13 AFE No Event Type:WORKOVER(WO) Start Date:12/6/2013 End Date:12/13/2013 X4-00YCQ-E:(1,600,000.00) ..-------------- Project:Milne Point Site:M Pt L Pad Rig Name/No.:DOYON 16 Spud Date/Time:4/23/1993 12:00:00AM Rig Release:12/13/2013 Rig Contractor:DOYON DRILLING INC. UWL 500292233500 Active datum:ORIG KELLY BUSHING©36.00usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 15:30 - 23:30 8.00 DHB P DECOMP PJSM,P/U DP FROM PIPE SHED. -CONTINUE TO RIH VITH RBP ON 4"DP 1X1 FROM PIPE SHED. -RIH ON D/P FROM 5044'MD TO 10,337'MD. -OBTAIN PARAMETERS PUWT=134K SOWT=100K(INCLUDES 40K BLOCK WT) -SET RBP AT 10337'MD COE,VERIFY WITH 15K DOWN WT,10K OVERPULL -RELEASE FROM PBR,POH 1 STAND -OA=OPSI -LOSS RATE=1 BPH -24 HOUR FLUID LOSS=201 BBLS 8.5 PPG SEAWATER 23:30 - 00:00 0.50 DHB P DECOMP PJSM,CASING TEST -MIT-IA,7"26#L-80 CASING -250 PSI,2500 PSI,30 MIN,CHART OA=O PSI -LOSS RATE=1 BPH -24 HOUR FLUID LOSS=201 BBLS 8.5 PPG SEAWATER 12/10/2013 00:00 - 00 30 0.50 DHB P DECOMP PJSM,PERFORM SPCC AND EQUIPMENT CHECKS,CHECK C.O.M. CONTINUE CASING TEST -MIT-IA,7"26#L-80 CASING -250 PSI,2500 PSI,30 MIN,CHART NOTIFY AND RECEIVE AUTHORIZATION TO PRECEDE FROM WTL PUWT=134K,SOWT=100K 00:30 - 01:00 0.50 DHB P DECOMP BLOW DOWN ALL LINES,R/D TEST EQUIP 01:00 - 02:30 1.50 DHB P DECOMP POOH FROM 10337'TO 7980'MD=25 STANDS -PUWT=104K=64K RTTS HANGING WT. (40K BLOCK WT) 02:30 - 03:00 0.50 DHB P DECOMP PJSM,M/U 7'RTTS PACKER -RIH 1 STAND BELOW TABLE -SET RTTS AT 97',7"26#L80 CASING 03:00 - 03:30 0.50 DHB P DECOMP TEST RTTS FROM THE TOP -250 PSI,2500 PSI,5 MIN,CHART -R/D TEST EQUIP 03:30 - 05:00 1.50 • BOPSUR P DECOMP PJSM WITH CAMERON REP FOR WELL HEAD WORK BLOW DOWN LINES,DRAIN BOP -N/D BOPE AND STAND BACK ON PEDESTAL -CAMERON REP REPAIR WELLHEAD LOCATING PIN,REPLACE BLIND FLANGE 05:00 - 07:00 2.00 WHSUR P DECOMP CAMERON REP REPAIR WELLHEAD LOCATING PIN -REPLACE EXSISTING BLIND FLANGE WITH TAPPED BLIND FLANGE/NEEDLE VALVE.ON TBG SPOOL. 07:00 - 08:30 1.50 WHSUR P DECOMP PJSM,NU BOP BREAK -INSTALL RISER,TURNBUCKLES,AND KOOMEY LINES. 1-RE-ENERGIZE KOOMEY. Printed 1/9/2014 2:15:25PM . North America-ALASKA-BP Page 7 of 11 Operation Summary Report Common Well Name:MPL-13 AFE No Event Type:WORKOVER(WO) Start Date:12/6/2013 End Date:12/13/2013 X400YCQ-E:(1,600,000.00) Project:Milne Point Site:M Pt L Pad Rig Name/No.:DOYON 16 Spud Date/Time:4/23/1993 12:00:OOAM Rig Release: 12/13/2013 Rig Contractor.DOYON DRILLING INC. UWI:500292233500 Active datum:ORIG KELLY BUSHING @36.00usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 08:30 - 11:00 2.50 WHSUR P DECOMP PJSM,TEST BREAK IN STACK -SET TEST PLUG AND RU TEST EQUIPMENT. -FILL BOP STACK -PT BREAK TO 250/3500 PSI FOR 5 CHARTED MIN.FAILED. -FOUND ROLLED 0-RING ON TEST PLUG. WAIT ON 0 RING AND NEW TEST PLUG FROM CAMERON. -DISCUSS WITH RWO TOWN ENGINEER. 11:00 - 12:00 1.00 WHSUR P DECOMP PJSM,TEST TBG SPOOL -RU TEST EQUIPMENT. -PT TBG SPOOL,VR PLUG,BLIND FLANGE 250/3500 PSI FOR 5 CHARTED MIN EACH. '0 LOSSES TO WELL. OA=0 PSI 12:00 - 13:00 1.00 WHSUR N WAIT DECOMP WAIT ON CAMERON REP FOR 0 RING KIT AND SPARE TEST PLUG. -RIG CREW PERFORMED HOUSEKEEPING/ MAINTENANCE AS DIRECTED BY TOOLPUSHER. 13:00 - 15:00 2.00 WHSUR P DECOMP PJSM,PRESSURE TEST BOP BREAK -PT BOP BREAK TO 250/3500 FOR 5 CHARTED MIN.FAILED ON HIGH TEST. -FOUND THAT UPPER FLANGE ABOVE LOWER PIPE RAMS WAS LEAKING. -RE-TORQUE FLANGE AND RE-TEST. -PT BOP BREAK TO 250/3500 PSI FOR 5 CHARTED MIN.PASSED. -PULL TEST PLUG. RIG DN TEST EQUIPMENT. 15:00 - 15:30 0.50 WHSUR P DECOMP RU TO PULL RTTS PER HES REP. -INSTALL 6 3/8"WEAR RING. -INSPECT HANDLING EQUIPMENT.CLEAR RIG FLOOR. 15:30 - 16:30 1.00 WHSUR P DECOMP PJSM,RETRIEVE RTTS. -PU 1 STD OF 4"DP FROM DERRICK AND RIH. MU FOSV TO 1 JT OF 4"DP -MU TOP DRIVE AND RIH -RELEASE RTTS AS PER HES REP -VERIFY NO PRESSURE AND FLOW CHECK •-POOH AND LAY DOWN RTTS 16:30 - 18:00 1.50 WHSUR P DECOMP RUN IN HOLE TO RBP -RIH WITH 4"DP -RIH TO 10337' -PUW=134K,SOW=100K _ 18:00 - 18:30 0.50 WHSUR P DECOMP RELEASE T'HES RBP -TAG RBP AT 10334' -WASH DOWN ON TOP OF RBP -ENGAGE RBP AND RELEASE AS PER HES .REP 18:30 - 19:30 1.00 WHSUR P DECOMP LINE UP TO BULLHEAD CLOSE ANNULAR -PUMP 40 BBLS,8.5 PPG SEAWATER -PUMP 6 BPM @ 2250 PSI -SHUT DOWN AND MONITOR,FINAL • PRESSURE=210 PSI -BLEED OF PRESSURE,OPEN ANNULAR -BLOW DOWN TOP DRIVE AND MONITOR WELL -WELL IS ON SLIGHT VAC Printed 1/9/2014 2:15:25PM North America-ALASKA-BP Page 8 of 11 Operation Summary Report Common Well Name:MPL-13 AFE No Event Type:WORKOVER(WO) Start Date:12/6/2013 End Date:12/13/2013 X4-00YCQ-E:(1,600,000.00) Project:Milne Point Site:M Pt L Pad Rig Name/No.:DOYON 16 Spud Date/Time:4/23/1993 12:00:OOAM Rig Release:12/13/2013 Rig Contractor DOYON DRILLING INC. UWI:500292233500 Active datum:ORIG KELLY BUSHING©36.O0usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 19:30 - 00:00 4.50 WHSUR P DECOMP POOH WITH 7"HES RBP -POOH WITH RBP FROM 10337' -PULL 4"DRILL PIPE -LDDP 1 X 1IN PIPE SHED -POOH TO 5044' -24 HOUR FLUID LOSS=74 BBLS 8.5 PPG SEAWATER (INCLUDES 40 BBLS BULLHEAD) 12/11/2013 00:00 - 03:00 3.00 WHSUR P DECOMP SPCC CHECKS AND PRE-TOUR MEETING POOH WITH 7"HES RBP -POOH WITH RBP FROM 5044' -PULL 4"DRILL PIPE -LDDP 1 X 1IN PIPE SHED -CHANGE OUT JOINT#94,DAMAGE UNDERNEATH COUPLING -CONTINUE POOH 03:00 - 03:30 0.50 WHSUR P DECOMP PJSM LAYING DOWN RBP WITH HES -LAY DOWN RBP&SETTING TOOL -ALL ELEMENTS ON RBP 03:30 - 04:30 1.00 WHSUR P DECOMP PJSM TO MAKE DUMMY HANGER RUN WITH CAMERON -PULL WEAR RING -MAKE UP 2-7/8"LANDING JOINT TO HANGER -RIH 24 FT,CAMERON TECH'J'HANGER INTO SPOOL -TOOLPUSHER AND WSL CONFIRM'J' -MEASURE ALIGNMENT PIN=0.75"ENGAGED -POOH AND LAY DOWN HANGER AND LANDING JOINT 04:30 - 06:00 1.50 RUNCOM P RUNCMP PJSM,RIG UP TO RUN COMPLETION. -HANG ESP SHEAVE IN DERRICK. -MOBILIZE CLAMPS TO RIG FLOOR AND ORGANIZE. 06:00 - 07:00 1.00 RUNCOM P RUNCMP ATTACH CABLE SNAKE TO ESP CABLE IN SPOOLER. PJSM THEN PULL CABLE FROM SPOOLER OVER SHEAVE AND DOWN TO RIG FLOOR. REMOVE CABLE SNAKE,PREP TO SPLICE CABLE. 07:00 - 11:30 4.50 RUNCOM P RUNCMP SPLICE FLAT AND ROUND ESP CABLE TOGETHER. 11:30 - 12:00 0.50 RUNCOM P RUNCMP CENTERLIFT TECH PERFORM CONDUCTIVITY CHECK ON ESP CABLE. 12:00 - 17:30 5.50 RUNCOM P RUNCMP MAKE UP MOTOR ASSEMBLY -PICK UP MOTOR/SEALASSEMBLY -SERVICE AND ASSEMBLE PUMP AS PER CENTRILIFT -CENTRILIFT REP MAKE CONNECTIONS TO MOTOR ASSEMBLY. CHECK CONDUCTIVITY PRIOR TO RIH. Printed 1/9/2014 2:15:25PM North America-ALASKA-BP Page 9 of 11 Operation Summary Report Common Well Name:MPL-13 AFE No Event Type:WORKOVER(WO) Start Date:12/6/2013 End Date:12/13/2013 X4-00YCQ-E:(1,600,000.00) Project:Milne Point Site:M Pt L Pad Rig Name/No.:DOYON 16 Spud Date/Time:4/23/1993 12:00:00AM Rig Release:12/13/2013 Rig Contractor:DOYON DRILLING INC. UWI:500292233500 Active datum:ORIG KELLY BUSHING @36.00usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 17:30 - 00:00 6.50 RUNCOM P RUNCMP RIH WITH 2 7/8"6.5#EUE 8 RD TUBING ESP COMPLETION FROM DERRICK. -TUBING TORQUE=2300 FT/LBS. -USE BEST 0 LIFE 2000 PIPE DOPE ON EVERY CONNECTION. -INSTALL CANNON CLAMPS ON EVERY COLLAR ON THE FIRST 9 JOINTS,THEN- EVERY HENEVERY OTHER JOINT -INSTALL CLAMPS ON EVERY COLLAR 'BETWEEN 1,250'-1,450'& 3,710'-3,810' -CHECK ESP CABLE CONDUCTIVITY EVERY 2000' -PUMP 5 BBLS TO FLUSH THRU PUMP AT.50 BPM/1300 PSI.EVERY 2000' -RUN IN HOLE TO-6600 FT -MAINTAIN CONTINUOUS HOLE FILL @-6 BPH W/8.5 PPG SEAWATER -24 HOUR FLUID LOSS=180 BBLS 12/12/2013 00:00 - 01:30 1.50 RUNCOM P RUNCMP SPCC CHECKS AND PRE-TOUR MEETING RIH WITH 2 7/8"6.5#EUE 8 RD TUBING ESP COMPLETION FROM DERRICK. RIH FROM-6600 FT -TUBING TORQUE=2300 FT/LBS. -USE BEST 0 LIFE 2000 PIPE DOPE ON EVERY CONNECTION. -INSTALL CANNON CLAMP ON EVERY OTHER JOINT -CHECK ESP CABLE CONDUCTIVITY EVERY 2000' 01:30 - 02:00 0.50 RUNCOM P RUNCMP KICK WHILE RIH DRILL -CORRECT SAFETY VALVE WAS LABLED AND STABBED IN A TIMELY MANNER -CREW MEMBERS MADE NOTICIATION ONCE AT ASSIGNED STATIONS -CALCULATED KILL SHEET WITH DRILLER& LEAD FLOORHAND 02:00 - 04:30 2.50 RUNCOM P RUNCMP ESP CABLE SPLICE -CENTRALIFT TECH PERFORM REEL TO REEL ESP CABLE SPLICE AT-7900' -PUMP 5 BBLS TO FLUSH THRU PUMP AT.50 BPM/740 PSI.AT-7900' -MAINTAIN CONTINUOUS HOLE FILLAT 6 BPH 04:30 - 08:00 3.50 RUNCOM ' P RUNCMP CONTINUE TO RUN ESP COMPLETION RIH WITH 2-7/8"TUBING FROM DERRICK RIH FROM-7900 FT -TUBING TORQUE=2300 FT LB • -INSTALL CANNON CLAMP EVERY OTHER JOINT 08:00 - 10:00 2.00 RUNCOM N I WAIT RUNCMP 4 FT PUP BELOW HANGER WILL NOT DRIFT. SWAP TO A DIFFERENT PUP AND MAKE UP, PRESSURE TEST IS GOOD. WHILE REMOVING THE COLLAR ON THE PUP THE THREADS GET DAMAGED. 10:00 - 11:00 1.00 RUNCOM N WAIT RUNCMP SWAP OUT 4 FT PUP TO A 10 FT PUP BELOW HANGER. CONFIRM WITH ODE THAT EXTRA SIX FOOT LENGTH IN COMPLETION WILL BE FINE. Printed 1/9/2014 2:15:25PM North America-ALASKA-BP Page 10 of 11 Operation Summary Report Common Well Name:MPL-13 AFE No Event Type:WORKOVER(WO) Start Date:12/6/2013 End Date:12/13/2013 X4-00YCQ-E:(1,600,000.00) Project:Milne Point Site:M Pt L Pad Rig Name/No.:DOYON 16 Spud Date/Time:4/23/1993 12:00:00AM Rig Release:12/13/2013 Rig Contractor:DOYON DRILLING INC. UWI:500292233500 Active datum:ORIG KELLY BUSHING @36.00usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 11:00 - 12:00 1.00 RUNCOM P RUNCMP MAKE UP LANDING JOINT AND HANGER. INSTALL PENETRATOR IN HANGER AND BEGIN FIELD SPLICE OF PLUG INTO HANGER. LOWER ESP CABLE TO SPOOLING UNIT. 12:00 - 14:30 2.50 RUNCOM P RUNCMP CONTINUE TERMINATE ESP PLUG AT HANGER. FINISH TERMINATION AND TEST. CLEAR RIG FLOOR OF CETERLIFT TOOLS. 14:30 - 15:00 0.50 RUNCOM P RUNCMP LAND HANGER. UP WEIGHT IS 101K,DOWN WEIGHT IS 77K. CAMERON RUN IN LDS. LAY DOWN LANDING JOINT,INSTALL TWC. -RAN 6 PROTECTORS,3 FLAT GUARDS AND 171 CANNON CLAMPS. 15:00 - 16:30 1.50 WHSUR P RUNCMP PERFORM ROLLING TEST FROM BELOW,500 PSI FOR 5 MIN. 22 BBLS PUMPED. VISUALLY CONFIRM NO LEAKS PAST TWC. PERFORM PRESSURE TEST FROM ABOVE, 250/3500 PSI,GOOD. 16:30 - 18:30 2.00 WHSUR P RUNCMP PJSM,N/D 13-5/8"5M BOP -BLOW DOWN CHOKE,KILL LINES N/D 13 5/8"BOPE REMOVE FLOW NIPPLE AND TURNBUCKLES. -LOTO KOOMY AND REMOVE HOSES. SET BACK BOP STACK 18:30 - 19:30 1.00 WHSUR P RUNCMP -PJSM,N/U 2-9/16"5M TREE AND ADAPTER -CAMERON REP CLEAN HANGER VOID -N/U ADAPTER AND TREE AS PER CAMERON REP -CENTRILIFT PERFORM FINAL CHECKS DOWNHOLE GAUGE READS 3093 PSI BHP AND 163.9 F TEMP 19:30 - 00:00 4.50 WHSUR P RUNCMP PRESSURE TEST ADAPTER VOID&TREE. -PT ADAPTER,5000 PSI FOR 30 CHARTED MINUTES.PASSED. -PRESSURE TEST PRODUCTION TREE -250/5000 PSI,BOTH 5 MINUTES CHARTED. PASSED. -WITNESSED BY WSL. -24 HOUR FLUID LOSS=134 BBLS KILL WEIGHT FLUID 12/13/2013 00:00 - 02:00 2.00 WHSUR P RUNCMP SPCC CHECKS AND PRE-TOUR MEETING PJSM,R/U WELL SUPPORT LUBRICATOR -RIG UP LUBRICATOR FROM RIG FLOOR TO TREE -TEST 250/3500 PSI, FOR 5 CHARTED MINUTES. PULL TWC 02:00 - 06:00 4.00 WHSUR P RUNCMP PJSM WITH LRS AND RIG CREW. -RU LRS TO TREE TO FREEZE PROTECT WELL. -TEST LINES TO 250/3500 PSI. -LOAD 15 BBLS DIESEL IN TBG. 0.5 BPM ,950 PSI -LOAD 75 BBLS CRUDE INTO IA. 1 BPM,500 PSI Printed 1/9/2014 2:15:25PM North America-ALASKA-BP Page 11 of 11 Operation Summary Report Common Well Name:MPL-13 AFE No Event Type:WORKOVER(WO) Start Date:12/6/2013 End Date:12/13/2013 X4-00YCQ-E:(1,600,000.00) Project:Milne Point Site:M Pt L Pad Rig Name/No.:DOYON 16 Spud Date/Time:4/23/1993 12:00:OOAM Rig Release:12/13/2013 Rig Contractor:DOYON DRILLING INC. UWI:500282233500 ll{ Active datum:ORIG KELLY BUSHING©36.00usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 06:00 - 08:00 2.00 WHSUR P RUNCMP INSTALL AND TEST BPV LUBRICATOR. SET BPV. RIG DOWN LUBRICATOR AND OFFLOAD. - 08:00 - 09:00 1.00 WHSUR P RUNCMP RIG UP LRS LINES FOR ROLLING TEST. PT LINES TO 1700 PSI,GOOD. CONDUCT ROLLING TEST OF BPV BY PUMPING 11 BBLS INTO IA,MAINTAINING 500 'PSI ON IA. ZERO TUBING PRESSURE,BPV IS HOLDING. RELEASE RIG AT 0900. ALL FURTHER I ENTRIES TODAY ON WELL MPL-25. Printed 1/9/2014 2:15:25PM • u. r TREE: 2 9/16"-5M WKM MP L-13 ORIG.KB.ELEb- ,' WELLHEAD:11" 5M WKM _J ORIG.GL.ELEV= 15' w/2 7/8"x 11"Tubing Hanger,2 7/8"8 rd.threads,2.5" "H"BPV profile 13 3/8"54.5#/ft K- 115' 55 2 7/8"x 1"Camco KBMM GLM 118 KOP @ 500' Ma.Hole Angle 54.5 Deg.AT 3811'MD 9 5/8",47#/ft, , 6086' N-80 Btrs. 27/8" 6.5#/ft.8 rd.EUE TBG 2.441"ID,2.347" DRIFT CAPACITY:0.00579 BBUFT 2 7/8"x 1"Camco KBMM GLM 9963' Y-7/5"'XN-nipple (3 094"bore)(2.25"no go) 10,116' .' T CentriliftPMSXD 18P75/161P11 10,159' Centrilift Gas Separator o°a GRSFTX AR H6 tamdem(400 int.) 10,188' Centrilift Tandem Seal Section GSB3DBUT SB/SB PFSA 10,193' GSB3DBLT SB/SB PFSA 4 Centrilift Motor 10,207' SlicMine drifted casing 10 10400'11/16/99 MSP-1/210hp. 2380 volt/53 amp Did not tag bottom do to bands in hole. ( Phoenix 10,223' PERFORATION SUMMARY C`J� 6 Fin Centralizer 10,225' SIZE SPF NTERVAL OPEV/SQZ'D ►r 7"Baker Model"D" perm. Pkr. W/20'of 20 Gage 10,453' 4.5" 12 10,669-10719' OPEN screen and taipipe. 4.5" 12 10,626-10656' OPEN 4.5" 12 10,598-10,618' OPEN 3-1/2"Camco"D" Npl.(2.75" 10,490' 4.5" 12 10,554-10,564' OPEN ID)w/A-2 blanking plug on C 4.5" 12 10,529-10,539' OPEN I Lock 10,493' 4.5" 12 10,498-10,518' OPEN 3.5"WLEG 1— ORIG.PB 10,868' 7"264,L-80,BTRS 10,996' DATE REV.BY COMMENTS MILNE POINT UNIT 02/25/95 JBF RWO WELL L13 11/16/99 M.Linder RWO Nabors 4-ES API NO: 50-029-22335 08/04/03 MDO ESP RWO Nabors 4-es 01/27/08 REH ESP RWO Nabors 3S 12/13/13 6/14/08 3 BE K ESP RWO-Nabors 3S BP EXPLORATION (AK) a~ ~.n~ STATE OF ALASKA ALA OIL AND GAS CONSERVATION COM~ION ~~~ !~-~ ~~ ~ l_il~R REPORT OF SUNDRY WELL OPERATIONS,', ~ ~. ~. _ i ea .. ,., ~,;.. w-M1 ren 1. Operations Performed: ,x ,.z . ^ Abandon ®Repair Well ^ Plug Perforations ^ Stimulate ^ Re-Enter Suspended Well ^ Alter Casing ®Pull Tubing ^ Perforate New Pool ^ Waiver ®Other ^ Change Approved Program ^ Operation Shutdown Change out ESP ~ ^ Perforate ^ Time Extension 2. Operator Name: 4. Well Class Before Work: 5. Permit To Drill Number: BP Exploration (Alaska) Inc. ®Development ^ Exploratory 193-012 , 3. Address: ^ Service ^ Stratigraphic 6. API Number: P.O. Box 196612, Anchorage, Alaska 99519-6612 50-029-22335-00-00 ' 7. KB Elevation (ft): KBE = 51' 9. Well Name and Number: MPL-13 • 8. Property Designation: 10. Field /Pool(s): ADL 025509 Milne Point Unit / Kuparuk River Sands • 11. Present well condition summary Total depth: measured 11016 feet true vertical 7409 - feet Plugs (measured) 10490' Effective depth: measured 10898 feet Junk (measured) None true vertical 7331 feet Casing Length Size MD •-~-••~ • TVD Burst Collapse Structural Conductor 110' 13-3/8" 110' 110' 2730 1130 Surface 6086' 9-5/8" 6086' 4409' 6870 4760 Intermediate Production 10996' 7" 10996' 7396' 7240 5410 Liner ~~N~~ JUL ~ ~ ~~~~ Perforation Depth MD (ft): 10498' - 10719' Perforation Depth TVD (ft): 7072' - 7213' 2-7/8", 6.5# L-80 10302' Tubing Size (size, grade, and measured depth): 3-1/2" tailpipe 10453' - 10493' Packers and SSSV (type and measured depth): 7" Baker Model'D' Perm Pkr with 20' of 20 Gage screen 10453' and ta ilpipe 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment description including volumes used and final pressure: 13. Re resentative Dail Avera a Production or In'ection Data Oil-Bbl Gas-Mcf Water-Bbl Casin Pressure Tubin Pressure Prior to well operation: Subsequent to operation: 14. Attachments: ^ Copies of Logs and Surveys run 15. Well Class after work: ^ Exploratory ®Development ^ Service ® Daily Report of Well Operations 16. Well Status after work: ® Well Schematic Diagram ®Oil ^ Gas ^ WAG ^ GINJ ^ WINJ ^ WDSPL 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or NIA if C.O. Exempt: Contact Howard West, 564-5471 NIA Printed Name Sondra Stewman " Title Drilling Technologist /~ ! Sig ature Prepared By Name/NumbeY: Phone 64-4750 Date -(~Z-~i Sondra Stewman, 564-4750 Form 10-404 Revised 0412006 ~ ~ ~ /t ` ~ IC~iE}""'~. EJ(~(_ ~ ~ ~(~a~ Submit Original Only i! //"'~1 L ~ -7.8.0$ TREE: 2 9/16" - SM WKM WELLHEAD: 11" SM WKM w/ 2 7/8" x 11"Tubing Hanger, 2 7/8" 8 rd. threads, 2.5" "H" BPV profile 13 3/8" 54.5#/ft K- 55 KOP ~ 500' I Ma. Hole Angle 54.5 De . AT 3811' MD I 9 5/8", 47 #/ft, 6086' N-80 Btrs. 2 7/8" 6.5 #/ft. 8 rd.EUE TBG 2.441" 1D, 2.347" DRIFT CAPACITY: 0.00579 BBL/FT ;'sEicklna lifted cawing fn 1?:CiO' 11:16x'99 Did not tag bc°iorn do tc bands ;n hole. PERFORATION SUMMARY SIZE PF NTERVAL OPE /SOZ'D 4.5" 12 10,669 - 10719' OPEN 4.5" 12 10,626 - 10656' OPEN 4.5" 12 10,598 - 10,618' OPEN 4.5" 12 10,554 - 10,564' OPEN 4.5" 12 10,529.10,539' OPEN 4.5" 12 10,498.10,518' OPEN M P L-13 ORIG. KB. ELEV ORIG. GL. ELEV = 15' DATE REV. BY COMMENTS 02/25/95 JBF RWO 11/16/99 M. Linder RWO Nabors 4-ES 6/14/08 ~ REH ~ ESP RWO -Nabors 3S 2 7/8" x 1" Camco KBMM GLM 142' 2 7/8" x 1" Camco KBMM GLM 10,145' ' 2.7i8" "XN" =.iippla 10 193' 12313" oere)(2.23" nc go) , Centrilift SXD 137-P17 10,240' Centrilift Gas Separator 10 259' GRSFTX AR H6 (400 int.) , Centrilift Tandem Seal Section GS83DBUT SB/SB PFSA 10,264' GS83DBLT SB/SB PFSA Centrilift Motor 10 278' KMH/228 hp. 2305 voIU60 amp , Phoenix 10,298' 7" Baker Model "D" perm. Pkr. W/ 20' of 20 Gage 10,453' screen and taipipe. " " " " 10 490' D Npl. (2.75 3-1/2 Camco , ID) w/ A-2 blanking plug on C Lock 10,493' 3.5" WLEG ORIG. PB 10,868' I 7" 26#, L-80, BTRS 10,996' MILNE POINT UNIT WELL L13 API NO: 50-029-22335 BP EXPLORATION (AK Digital,We11 File Well: MPL-13 Well History Well Date MPL-13 6/5/2008 MPL-13 6/7/2008 MPL-13 6/8/2008 MPL-13 6/12/2008 MPL-13 6/15/2008 MPL-13 6/17/2008 Print Date: 7/1/2008 • • Summary T/I/0=250/260/0 Freeze Protect (Pre-RWO) -Freeze protect test & production laterals w/2 bbls 60/40, 2 bbls diesel & 2 bbls 60/40 each. Blocked & flagged @ laterals & bleed to 0 psi. Freeze protect tbg w/15 bbls diesel. Tag well, verify casing valves open to gauges & notify operator. Final WHP's=150/260/0 ***ARRIV ON LOC WELL S/I*** (pre rwo) PULLED 1" BK-DGLV FROM 10151' MD (10285' SLM) LEFT OPEN PULLED 1" BEK-DPSOV FROM 142' MD (124' SLM) SET 1" BK-DGLV WELL SUPPORT SET BPV *** TURN WELL OVER TO PAD OP. '*" Well Support Techs removed the wellhouse, production lines, and foundation. BPV was set with the assistance of the slickline unit at the end of their demobe work. ****NOTE"** BPV is set. PULLED AND RE-SET DUMMY VALVE, SET DPSOV ON 3S RIG FLOOR. DPSOV MANDREL FLAGGED AND TAGGED. ( Freeze Protect IA and TBG) T/I/0= 0/0/0 Pump 15 bbls dead crude down TBG followed by 65 bbls dead crude down IA to Freeze Protect Well. FWHP= 0/0/0 NOTE :All bolts where loose on Inside IA Flange that bolts to tree .Contacted John Perl to send out well techs to tighten L-13 Rehook ,Pulled BPV and PT flow -lines to 1150 PSI for 10 min with diesel. Page 1 of 1 Page 1 of 1 http://digitalwellfile.bpweb.bp.coin/WIInfo/Reports/ReportViewer.aspx 7/1/2008 BP EXPLORATION Page 1 of 3 Operations Summary Report Legal Well Name: MPL-13 Common W ell Name: MPL-13 Spud Date: 4/23/1993 Event Nam e: WORKO VER Start : 6/9/2008 End: Contractor Name: NABOB S ALASK A DRI LLING I Rig Release: Rig Name: NABOB S 3S Rig Number: Date From - To Hours Task Code I'~, NPT Phase Description of Operations 6/9/2008 20:00 - 00:00 4.00 MOB P PRE R/D floor, Lower windwall, Scope down and lay mast over on carrier. Slowdown water and steam lines. Unhook electrical lines. Remove berming. Prep components for rig move to MPL-Pad. 6/10/2008 00:00 - 05:00 5.00 MOB P PRE Peak trucks on location at midnight. Hold PJSM with all personnel involved. Move pits and pipeshed and stage on location. Move carrier off of MPG-18. Move from MPG-Pad to MPL-Pad. Move off MPG-Pad, down Tract 14 road to Milne Point Main Road. Left on Milne Point Main Road to MPL- Pad Access Road. Left on MPL- Pad Access Road to MPL-Pad. Stage equipment on location. 05:00 - 10:00 5.00 MOB P PRE Line up Carrier to MPL-13. Lay mats and herculite around well. Spot the BOPE Cradle behind the well. Back the Carrier over well slot MPL-13 with the Pad Operator, WSL and Toolpusher present. Lay Herculite and spot the Pipe Shed and Pits Modules. 10:00 - 12:00 2.00 RIGU P PRE PJSM. Raise and scope the Derrick. Rig up crew from GPB Wells Support arrives on location to RU and berm the Tiger Tank. 12:00 - 13:00 1.00 RIGU P PRE R/U lines to derrick, R/U floor, put steam and water around. 13:00 - 15:30 2.50 KILL P DECOMP R/U lines to tree for well kill. Fill lines with water and pressure test mud lines to 3,500 psi. Pressure test hard line to tiger tank to 500 psi. *** Rig Accepted at 13:00 hours on 6/10/2008*** 15:30 - 17:30 2.00 KILL P DECOMP R/U lubricator and ressure test to 500 si. Pull 2-1/2" CIW T e H BPV., Tubing pressure, IA pressure 370 psi, OA pressure 0 psi. 17:30 - 22:30 5.00 KILL P DECOMP Bleed gas off IA. Pressure came down to 40 psi quickly. Pump 60 bbls of 120 degree seawater down tubing lined up to take returns out the IA through the choke to the tiger tank. 3 bpm with 70 psi pressure, no returns. Bullhead 60 bbls of 120 degree seawater down tubing at 3 bpm with 140 psi pump pressure. Line up and pump down the tubing with 120 degree seawater lined up to take returns out the IA through the choke out to the tiger tank. Caught fluid at 20 bbls pumped. Pumped at 3 bpm with 950 psi on the tubing and 540 psi on the choke. Getting 50% returns. Heaw crude back. At 400 bbls pumped, Shut in well. 0 psi on tubing and 160 psi on IA with pressure slowly bleeding down. 22:30 - 00:00 1.50 KILL N DECOMP Monitor well while waiting on seawater trucks. Tubing pressure 0 psi, IA pressure 130 psi. 6/11/2008 00:00 - 01:30 1.50 KILL N DECOMP Monitor well while waiting on seawater trucks. Tubing pressure 0 psi, IA pressure 130 psi. 01:30 - 05:00 3.50 KILL N DECOMP Bullhead 415 bbls of 120 de ree seawater do .Caught fluid at 71 bbls pumped. Bullhead at 3 bpm with 1,650 psi. Shut down and monitor well for 10 minutes. Pressure bled to 0 psi. Line up and bullhead 60 bbls of 120 degree seawater down tubing. 3 bpm with 1,920 psi. 05:00 - 05:30 0.50 KILL N DECOMP Monitor well, tubing pressure = 0 psi, IA pressure = 0 psi. Both tubing and IA are on a vac. 05:30 - 06:00 0.50 KILL N DECOMP Blow down and R/D circulating lines. 06:00 - 07:00 1.00 KILL N DECOMP Dry rod TWC with Cameron WH tech. Test from above to Printed: 6/30/2008 9:30:38 AM BP EXPLORATION Page 2 of 3 Operations Summary Report Legal Well Name: MPL-13 Common Well Name: MPL-13 Spud Date: 4/23/1993 Event Name: WORKOVER Start: 6/9/2008 End: Contractor Name: NABORS ALASKA DRILLING I Rig Release: Rig Name: NABORS 3S Rig Number: Date From - To Hours ~ Task Code NPT Phase Description of Operations 6/11/2008 06:00 - 07:00 1.00 KILL N DECOMP 3500 si. Chart for 10 minutes. Pre to RD tree. 07:00 - 08:00 1.00 KILL N DECOMP Check IA pressure with new gauge. IA with 40 psi. RU to bleed IA to Tiger Tank. Bleed gas to tiger tank. Shut in , pressure back to 40 psi. Call for BPV crew. 08:00 - 09:00 1.00 KILL N DECOMP PU lubricator ull TWC. Tubing on vacuum. U-tube IA to Tubing. Gas from IA. 09:00 - 12:30 3.50 KILL N DECOMP Open well to 0 psi on Tubing, 20 psi on IA. Bleed gas from IA to Tiger Tank. Circulate 90 Bbls before getting returns of crude and Gas. Circulate ~ 4 BPM 1100 psi, 80 psi on IA with 40% losses. Circulate 562 Bbls with 335 Bbls of returns. (37 losses to formation Circulated bottoms up and clean SW returns. 12:30 - 13:30 1.00 KILL P DECOMP Monitor well. Tubing and IA on major vacuum. Dry rod TWC. Test from above to 3500 si and chart for 10 minutes. 13:30 - 15:30 2.00 WHSUR P DECOMP IA on Vaccum. Gravity feed 20 Bbls in IA. ND tree. Check hanger threads for 2-7/8" EUE landing joint with 7 turns. Function LDS. 15:30 - 19:30 4.00 WHSUR P DECOMP NU BOPE. Function BOPE. States right to witness BOPE testing waived by Bob Noble C~3 16:15. 19:30 - 23:00 3.50 BOPSU P DECOMP Test Blind Rams, VBR's, Annular Preventer, HCR Choke Valve, HCR Kill Valve, Manual Choke Valve, Manual Kill Valve, Choke Manifold Valves, TIW Valve and Dart Valve to 250 psi low and 3,500 psi high pressures. Hold each test for 5 minutes on the chart. Tested using a 2-7/8" Test Joint. Performed Draw down Test on Koomey. Good Test, No Failures. AOGCC witness of test was waived by Bob Noble, test was witnessed by BP WSL and Nabors Toolpusher. 23:00 - 23:30 0.50 BOPSU P DECOMP Rig down test assembly. Drain BOP stack and blow down choke manifold. 23:30 - 00:00 0.50 WHSUR P DECOMP M/U Opso Lopso. 6/12/2008 00:00 - 01:00 1.00 WHSUR P DECOMP R/U lubricator and test to 500 si. Pull TWC. 0 psi on tubing and IA. Tubing and IA on vacuum. R/D lubricator. 01:00 - 01:30 0.50 PULL P DECOMP R/U containment trunk for ESP cable. 01:30 - 02:00 0.50 PULL P DECOMP M/U landing joint with TIW valve, screw into hanger. Back out lock down screws and pull hanger to rig floor. 90K coming off seat and 88K up weight. 02:00 - 02:30 0.50 PULL P DECOMP UD hanger and landing joint. Filling hole with 20 bbls/hr seawater. 02:30 - 06:00 3.50 PULL P DECOMP POOH with SP com I tion standin back 2-7/8" tubin . Pumping 20 bbls/hr of seawater down IA. Pulled tight at 9,630', pulled 110K, S/O to downweight of 46K, pulled 110K, S/O to down weight of 46K, pulled back up with normal weight of 88K. Continue to POOH 06:00 - 15:30 9.50 PULL P DECOMP Continue to POH standing back 2 7/8" tubing in Derrick. Strap tubing in Derrick as POH. Maintain continuous hole fill ~ =/- Recovered 325 joints, 2 GLM's, and all pup joints. Recovered 167 LaSalle clamps, 5 protectolators, 3 Flat guards. (Nothing left in hole from previous completion). Cable damaged with armor torn (appeared as if armor caught on something in numerous places) from stand 147 to 150. 15:30 - 18:00 2.50 PULL P DECOMP BOLD ESP Assembly. 18:00 - 19:00 1.00 PULL P DECOMP Clear and clean rig floor and pipeshed. R/D ESP handling equipment. Printed: 6/30/2008 9:30:38 AM J ~ ~ BP EXPLORATION Operations Summary Report Page 3 of 3 Legal Well Name: MPL-13 Common Well Name: MPL-13 Spud Date: 4/23/1993 Event Name: WORKOVER Start: 6/9/2008 End: Contractor Name: NABOBS ALASKA DRILLING I Rig Release: Rig Name: NABOBS 3S Rig Number: Date From - To Hours ', Task Code NPT Phase Description of Operations 6/12/2008 19:00 - 20:00 1.00 CLEAN C DECOMP M/U 7" Casing Scraper assembl .Muleshoe, 2-7/8" Pup, XO, XO, 7" Casing Scraper, XO. Total BHA length = 18.82' 20:00 - 00:00 4.00 CLEAN C DECOMP RIH with 7" Casin Scra er assembl on 2-7/8" tubin from derrick. Maintain 20 bbl/hr fill rate. 6/13/2008 00:00 - 01:00 1.00 CLEAN C DECOMP RIH with 7" Casing Scraper assembly on 2-7/8" tubing from 01:00 - 04:00 3.00 CLEAN C 04:00 - 06:00 2.00 CLEAN C 06:00 - 10:00 4.00 CLEAN C 10:00 - 11:30 1.50 CLEAN C 11:30 - 14:00 2.50 BUNCO 14:00 - 00:00 10.00 BUNCO 6/14/2008 100:00 - 03:00 I 3.00 03:00 - 04:30 1.50 BUNCO 04:30 - 06:00 1.50 BUNCO 06:00 - 07:00 1.00 WHSUR P 07:00 - 10:30 3.50 WHSUR P 10:30 - 12:30 2.00 WHSUR P 12:30 - 14:00 I 1.50 I I P derrick to 9,806'. Maintail 20 bbl/hr fill rate. Did not see~Dy indication at 9 630' DECOMP Pump 30 bbl high vis sweep around at 4 bpm with 750 psi. Sweep did not bring anything up. Loss rate of 25%. DECOMP POOH with 7" Casing Scraper, standing back 2-7/8" tubing in the derrick. Maintain 20 bbl/hr fill rate. DECOMP Continue POH w/ 7" Csg scraper. Lay down two bad joints (galled threads) DECOMP BOLD 7" Csg scraper. Clean and clear rig floor. Remove elephant trunk from shieve, prep for running ESP RUNCMP PUMU Centrilift ESP Assembl .228 HP motor w/ 137-P17 SXD pump. RUNCMP RIH w/ 321 'oints of 2-7/8 in tubin 1 XN nip, 2 GLM's. Install LaSalle clamps on first nine joints, then every joint thereafter. Maintain hole fill ~ -20 Bbl/hr as RIH. 30 stands in hole ~ 1630. Test cable ok, flush pump w/ SW ~ 1/2 BPM, 370 psi. Test cable every 2,000' and at splice. RUNCMP RIH w/ 321 joints of 2-7/8 in tubing, 1 XN nip, 2 GLM's. Install LaSalle clamps on first nine joints, then every joint thereafter. Maintain hole fill ~ -20 Bbl/hr as RIH. Test cable and flush pump w/ 10 bbls of seawater every 2,000' and at splice. 1/2 bpm at 750 psi on final flush. Ran 3 Flat Guards, 5 Protectolizers and 168 LaSalle clamps. Used Best-O-Life 2000 Pipe dope, Average M/U torque = 2,300 ft/Ibs. RUNCMP M/U hanger and make penatrator splice on ESP cable. Up weight 80K, Down weight 45K. RUNCMP Land hanger and RILDS. Up weight 80K Down weight 45K. UD landing joint. RUNCMP Dry rod TWC. Test from above to 3500 si and chart f r 10 minutes. Unable to test from below. RUNCMP ND BOPE. Lay ROPE over in cradle. ND DSA. RUNCMP NU Tree. Centrilift make final ESP checks: BHJP 2391 psi / BHT 155.8 deg F / 1 gig meg-ohms. Test tubing head adaptor and tree to 5000 psi w/diesel. OTHCMP Pull TWC w/lubricator. Install BPV. Normal up tree and cellar. Release Rip ~ 14:00 hours. Printed: 6/30/2008 9:30:38 AM s STATE OF ALASKA ~ 11/14/07 OIL AND GAS CONSERVATION COMMISSION BOPE Test Report ', Submit to: im.re~~ ~~~ac#~~~.tg,7i do,a.an~cc. r;~rii~ae.bas ~~:laslsa.gov ~o€~ .f:;t: krsr:~t~;i3~t~) ~ ~~_ir;~. ~~~iv Contractor: Nabors Ri No.: 3S DATE: 6/11/2008 Rig Rep.: J.Greco/R.Bjorhus Rig Phone: 659-4487 Rig Fax: 659-4486 Operator: BP Op. Phone: 659- 4485 Op. Fax: 659-4628 Rep.: J.Menke/B.Burson Field/Unit & Well No.: MPU L-13 PTD # 133012Q Operation: Test: Test Pressure: Drlg: Workover: X Initial: X Weekly: Rams: 250/3500 Annular: 250/3500 TEST DATA MISC. INSPECTIONS: Test Result Test Result Location Gen.: P Well Sign P Housekeeping: P Drl. Rig P PTD On Location P Hazard Sec. P Standing Order Posted P BOP STACK: Quantity Size Test Result Annular Preventer 1 13 5/8 5000 P Pipe Rams 1 2 7/8"x5" var. P Lower Pipe Rams Blind Rams 1 Blind P Choke Ln. Valves 1 3 1/8" 5000 P HCR Valves 2 3 1/8" 5000 FP Kill Line Valves 1 2 1 /16" 5000 P Check Valve 0 NA MUD SYSTEM: Visual Test Alarm Test Trip Tank P P Pit Level Indicators P P Flow Indicator P P Meth Gas Detector P P H2S Gas Detector P P Test Results Explor.: Bi-Weekly Valves: 250/3500 FLOOR SAFETY VALVES: Quantity Test Result Upper Kelly 1 NT Lower Kelly 1 NT Ball Type 1 P Inside BOP 1 P CHOKE MANIFOLD: Quantity Test Result No. Valves 13 P Manual Chokes 1 P Hydraulic Chokes 1 P ACCUMULATOR SYSTEM: Time/Pressure Test Result System Pressure 3000 P Pressure After Closure 1725 P 200 psi Attained 30 sec P Full Pressure Attained 2 min 57 sec P Blind Switch Covers: All stations P Nitgn. Bottles (avg): 1950 psi Number of Failures: 1 Test Time: 3.5 Hours Components tested ALL Repair or replacement of equipment will be made within Done days. Notify the North Slope Inspector 659-3607, follow with written confirmation to Superviser at: "i W:.: c~ ~ ~iasKu.4 cv Remarks: Kill HCR Valve Leaked, greased, Tested O.K. Tested with 2 7/8" Test Joint 24 HOUR NOTICE GIVEN YES X NO Date 06/09/08 Time Test start 19:30 Finish Waived By 6:15 Witness R Bob Nobel Burson BOP Test (for rigs} BFL 11/14/07 `~`~ ~ ~V~ ~ ~. Z~p Nabors 3S BOP Test MP L-13 6-11-08.x1s 1~'I.-~ ~ STATE OF ALASKA ~~J~O~ ALASKA OIL AND GAS CONSERVATION COMMTSSION ~~B ~ ~r ~~~~ 1"' REPORT OF SUNDRY WELL OPERATIONS~~asl~a l~il ~ Gay C~n~. ~~~~i~~~~~ Aar_hnrnas 1. Operations Performed: ^ Abandon ®Repair Well ^ Plug Perforations ^ Stimulate ^ Re-Enter Suspended Well ^ Alter Casing ®Pull Tubing ^ Perforate New Pool ^ Waiver ®Other ^ Change Approved Program ^ Operation Shutdown Change out ESP ^ Perforate ^ Time Extension 2. Operator Name: 4. Well Class Before Work: 5. Permit To Drill Number: BP Exploration (Alaska) Inc. ®Development ^ Exploratory 193-012 3. Address: ^ Service ^ Stratigraphic 6. API Number: P.O. Box 196612, Anchorage, Alaska 99519-6612 50-029-22335-00-00 " 7. KB Elevation (ft): KBE = 51' ~ 9• Well Name and Number: MPL-13 ' 8. Property Designation: 10. Field /Pool(s): ADL 025509 ' Milne Point Unit / Kuparuk River Sands 11. Present well condition summary Total depth: measured 11016 ~ feet true vertical 7409 ~ feet Plugs (measured) 10490' Effective depth: measured 10898 feet Junk (measured) None true vertical 7331 feet Casing Length Size MD TVD Burst Collapse Structural Conductor 110' 13-318" 110' 110` "' '-" 2730 1130 Surface 6086' 9-5/8" 6086' 4409' 6870 4760 Intermediate Production 10996' 7" 10996' 7396' 7240 5410 Liner Perforation Depth MD (ft): 10498' - 10719' Perforation Depth TVD (ft): 7072' - 7213' 2-718", 6.5# L-80 10306' Tubing Size (size, grade, and measured depth): 3-1/2" tailpipe 10453' -10493' Packers and SSSV (type and measured depth): 7" Baker Model'D' Perm Pkr with 20' of 20 Gage screen 10453' and ta ilpipe 12. Stimulation or cement squeeze summary: Intervals treated (measured): ,: ~ s,)~ ~ ~~~t `s'' Z~Q Treatment description including volumes used and final p ressure: 13. Re resentative Dsiil Avera a Production or In'ection Data Oil-Bbl Gas-Mcf Water-Bbl Casin Pressure Tubin Pressure Prior to well operation: 0 0 0 800 0 Subsequent to operation: 452 162 668 380 264 14. Attachments: ^ Copies of Logs and Surveys run 15. Well Class after work: ^ Exploratory ®Development ^ Service ® Daily Report of Well Operations 16. Well Siiatus after work: ® Well Schematic Diagram ®Oil ^ Gas ^ WAG ^ GINJ ^ WINJ ^ WDSPL 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt: Contact Howard West, 564-5471 N/A Printed Name Sondra Stewman Title Drilling Technologist Prepared By Name/Number: Signa ~ ~.. Phone 564-4750 Date (~, -q~ 1~ Sondra Stewman, 564-4750 Form 10-404 Revised 04/2006 r Submit Original Only (at ~ (,'S TREE: 2 9/16" - SM WKM WELLHEAD: 11' SM WKM w/ 2 7/8" x 11" Tubing Hanger, 2 7/8' 8 rd. threads, 2.5" 'H" BPV profile 133/8" 54.5#/ft K- 115' 55 KOP ~ 500' Ma. Hole Angle 54.5 De . AT 3811' MD 9 5/8", 47 #fft, 6086' N-80 Btrs. 2 7/8" 6.5 #/ft. 8 rd.EUE TBG 2.441" ID, 2.347" DRIFT CAPACITY: 0.00579 BBL/FT Slickline dnfi~/d ;.acing to 104fl0' 11: ? 6f99 Cid no; afl ;~ottf,m do *.o Lands'n hnVe. PERFORATION SUMMARY M P L-1 ~ ORIG. KB. ELEV -_51' ORIG. GL. ELEV = 15' SIZE PF NTERVAL OPE /SOZ'D 4.5" 12 10,669 -10719' OPEN 4.5" 12 10,626 - 10656' OPEN 4.5" 12 10,598.10,618' OPEN 4.5" 12 10,554 - 10,564' OPEN 4.5" 12 10,529 - 10,539' OPEN 4.5" 12 10,498 - 10,518' OPEN 2 7/8" x 1" Camco KBMM GLM 142` 2 7/8" x 1" Camco KBMM GLM 10,151' I 2a;S° °xN° ,;ip~~p 10 199' (2.313" Sore){2.205° no ge} , Centrilift PMSXD 1:7 119 P23 10,242` Centrilift Gas Separator 10 259` GRSFTX AR H6 (400 int.) , Centrilift Tandem Seal Section GSB3DBUT SB/SB PFSA 10,264` GS83DBFERHLSSCVHS SB/SB PFSA Centrilift Motor KMHG/265 hp. 2345 volt/69 amp 10 278` Motor Rerate: KMH-A 195 hp 2177v/53amp Phoenix XT-0 (~ SOCei 7" Baker Model "D" perm. Pkr. WI 20' of 20 Gage 10,453' screen and taipipe. 3-1/2" Camco "D" Npl. (2.75" 10,490' ID) w/ A-2 blanking plug on C Lock 10,493' 3.5" WLEG ~~~ lLr 10,996' ORIG. PB 7" 26#, L-80, BTRS DATE EV. BY 02/25/95 JBF 11/16/99 M. Linder 08/04/03 MDO 01/27/08 REH COMMENTS RWO RWO Nabors 4-ES ESP RWO Nabors 4-es ESP RWO Nabors 3S MILNE POINT UNIT WELL L13 API NO: 50-029-22335 BP EXPLORATION • • BP EXPLORATION Operations Summary Report Page 1 of 4 ~ Legal Well Name: MPL-13 Common Well Name: MPL-13 Spud Date: 4/23/1993 Event Name: WORKOVER Start: 1/18/2008 End: 1/27/2008 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 1/27/2008 Rig Name: NABOBS 3S Rig Number: Date ~ From - To Hours Task I Code',. NPT ; Phase Description of Operations 1/19/2008 21:00 - 22:00 1.00 MOB P PRE Hold PJSM with Peak and all involved personnel involved. Latch Peak trucks up to pits and pipeshed. Load shop. 22:00 - 00:00 2.00 MOB P PRE Jack down carrier. Stage units on pad to prepare for rig move. 1/20/2008 00:00 - 09:30 9.50 MOB P PRE Move Nabors 3S from Nabors Frontier Pad to Milne Point L-Pad. Stopped and checked tires and let traffic around at West Ilene Lake, WOA guard shack, DS 14, Pump Station 1, J-Pad, and Z-Pad access. 09:30 - 11:00 1.50 MOB P PRE Shut down at Milne Point turnoff and wait for bus for Milne Point change out. Fuel rig. 11:00 - 15:30 4.50 MOB P PRE Continue moving Nabors 3S from Milne Point turnoff to Milne Point L-Pad. 15:30 - 17:00 1.50 MOB P PRE Set camp, shop and generator unit. Hook up electrical lines to camp and shop. Remove well guard from MPL-13. Clear snow from around well for spotting BOP stack. 17:00 - 19:00 2.00 MOB P PRE Hold ATP meeting with Milne Point and Nabors 3S crews. 19:00 - 21:00 2.00 MOB P PRE Continue to clear snow from around well and spot BOP stack. 21:00 - 23:00 2.00 MOB P PRE Set mats, lay herculite and spot Nabors 3S over MPL-13. Level rig and berm around carrier. 23:00 - 00:00 1.00 MOB P PRE Spot pipe shed, lay herculite and spot pits. 1/21/2008 00:00 - 00:30 0.50 MOB P PRE Continue to spot and level pits. 00:30 - 02:00 1.50 MOB P PRE Berm around rig and install handrails. 02:00 - 03:30 1.50 MOB P PRE Hook up electrical lines for pipeshed. Hook up mud lines. 03:30 - 06:00 2.50 MOB P PRE Raise mast and scope up. Plug in electrical from pits to carrier. Secure mast, tighten load lines. Plug in lights and secure stablizer lines. Secure rig floor. 06:00 - 15:00 9.00 RIGU P PRE Work in all areas of the Rig on action items identified from the initial walkthrough rig audit. Items addressed included: SAA/RAA/UAA areas, signage, fire extinguishers, inspection/removal of slings, organizing of tools, inventory and organizing of PPE lockers and general housekeeping of all modules including the Shop. 15:00 - 17:00 2.00 RIGU P PRE Perform final rig audit walkthrough with Drilling HSE Advisor and Well Site Leader. Documented the action items completed and those in progress. The Rig was accepted at 17:00 hrs on 1 /21 /2008. 17:00 - 20:00 3.00 KILL P DECOMP Ri u to the Tree to kill the well. Rig up the Tiger Tank for returns. Install double valve on the Inner Annulus. 20:00 - 21:30 1.50 KILL P DECOMP Pressure test lines to 3,500 psi. Tighten valve flanges on choke manifold. Retest to 3,500 psi and blow down lines. 21:30 - 23:00 1.50 KILL P DECOMP Warm hardline to tiger tank with steam and test to 500 psi. Blow down line. 23:00 - 00:00 1.00 KILL P DECOMP 'R/U lubricator and test to 500 si. 1/22/2008 00:00 - 01:00 1.00 KILL P DECOMP Pull BPV. 780 si on tubin , 790 si on casin . R/D lubricator 01:00 - 03:00 2.00 KILL P DECOMP Pump 60 bbls down tubing. 3 bpm ~ 1,130 psi. Partial returns at 42 bbls pumped. 03:00 - 04:00 1.00 KILL P DECOMP Bullhead 60 bbls down tubing. 2 bpm @ 1,150 psi. 04:00 - 07:00 3.00 KILL P DECOMP Line up and pump heated seawater down tubing taking returns out to tiger tank. Pumping at 3 bpm / 975 psi with 590 psi on the Inner Annulus. Getting thick crude returns. Begin seeing seawater in returns after 450 bbls pumped. Continue pumping until clean returns observed, pumped a total of 492 bbls of seawater. 320 bbls of returns in the Tiger Tank after shutting down (65% returns). Printed: 2/4/2008 11:21:36 AM • • BP EXPLORATION Operations Summary Report Page 2 of 4 Legal Well Name: MPL-13 Common Well Name: MPL-13 Spud Date: 4/23/1993 Event Name: WORKOVER Start: 1/18/2008 End: 1/27/2008 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 1/27/2008 Rig Name: NABOBS 3S Rig Number: Date From - To Hours Task j Code I NPT ~~ Phase Description of Operations 1/22/2008 07:00 - 07:30 0.50 KILL P DECOMP Monitor the well for 30 mins -both the Tubin and the IA are or a vacuum. 07:30 - 09:00 1.50 KILL P DECOMP Blow down all surface lines and line to the Tiger Tank. RD well kill equipment from the Tree. 09:00 - 12:00 3.00 KILL P DECOMP Dry rod two-way check with Cameron rep: Test from above to 12:00 - 15:30 I 3.501 KILL I P 15:30 - 22:30 I 7.001 BOPSUR P 22:30 - 00:00 1.50 BOPSU P 1/23/2008 00:00 - 02:30 2.50 BOPSU 02:30 - 04:00 1.50 BOPSU N 04:00 - 06:00 2.00 BOPSU 06:00 - 21:30 15.50 PULL N 21:30 - 00:00 2.50 PULL N 1/24/2008 00:00 - 06:00 6.00 PULL N 06:00 - 09:30 3.50 PULL N 09:30 - 10:30 1.00 PULL N 10:30 - 11:30 1.00 PULL P 11:30 - 12:00 0.50 PULL P 12:00 - 13:00 1.00 PULL P 13:00 - 17:30 4.50 PULL P 17:30 - 00:00 6.50 PULL P 1/25/2008 100:00 - 04:30 I 4.501 PULL I P 04:30 - 07:30 I 3.001 PULL I P injecting at a rate of 1.5 bpm / 350 psi for 30 charted mins. It took 24 bbls to fill the IA and catch pressure. DECOMP ND tree. Inspect hanger threads, screw in XO to ensure no damage. Fill IA w/ 20 Bls of SW every hour as ND and NU BOPE DECOMP PU BOPE, stab onto wellhead and NU. Called Chuck Sheve w/ AOGCC ~ 17:00 for 2 hour notice for BOPE testing. AOGCC right to witness test waived. TU lines to BOPE and function test same. DECOMP Pressure test BOPE 250 si low, 3500 si hi h. Annular tested to 3500 si. DECOMP Continue pressure testing BOPE. VBR's failed to fully close completely during testing. SFAL DECOMP Phase 3 weather conditions in effect ~ 3:00 a.m. Change out VBR's to 2 7/8" fixed rams. DECOMP Complete BOPE testing and Accumulator test. Rig down test equipment. Waiting on weather. Phase 3 conditions. WAIT DECOMP WOW. Monitor rig equipment, All crew members using buddy system, all outside operations suspended. Well taking 5 bph. WAIT DECOMP Weather Phase 2 level 3, start digging out loader and rig. Dig out and secure berming around rig. WAIT DECOMP Get loader running, clean out all equipment intakes, clear snow from all entrances and exits. Currently in Phase2 Level 3. DECOMP Crew change, clean and clear snow, RU for pulling completion. RU shieve and elephant trunk. DECOMP MU Opso-Lopso. Torque XO to tbg hanger. MU to hanger w/ 9 1/2 turns. Wait on WS crew to pull TWC DECOMP PUMU polish rod /pulling tool and lubricator. Pull TWC. Tba and IA on Vac. BOLD lubricator and Opso-Lopso. DECOMP PUMU 2 7/8" landing joint, TIW and circ lines. MU to hanger. Break out LDS in hanger. DECOMP Pull han er free w/ 85 K. Load hole w/ 20 Bbls SW. Circulate down tubing returns from annulus C~1 3 BPM, 680 psi. Crude in returns. DECOMP POOH pumping SW across the top, losses ~ -25 Bls/Hr. DECOMP Cut cable and swap out spools. Continue POH to 3996'. Clamps, ESP cable and tubing appear to be in good condition. The connections on the tubing are tight. 8 joints with galled threads. Losses 25 -30 bph. DECOMP POOH with ESP com letion. Recovered 165 clamps, 3 flat guards and 5 protectolizers. A total of 16 joints 2=7/8" tubing with galled threads. Tally from when completion was run indicated 325 joints ran. Pulled 321 joints. Tallly was off. DECOMP UD ESP. While BOLD ESP and pump secton, 1 bolt was dropped. Was not found on rig floor and assumed to have fallen downhole. Found piece of banding material in suction of Printed: 2/4/2008 11:21:36 AM • • BP EXPLORATION Operations Summary Report Page3of4~ Legal Well Common W Event Nam Contractor Rig Name: Date ~ Name: ell Name: e: Name: From - To MPL-13 MPL-13 WORKO NABOB NABOB Hours ' VER S ALASK S 3S Task DRI Code ~I LING NPT Start I Rig Rig Phase ~ Spud Date: 4/23/1993 : 1/18/2008 End: 1/27/2008 Release: 1/27/2008 Number: Description of Operations 1/25/2008 04:30 - 07:30 3.00 PULL P DECOMP ESP. 07:30 - 08:30 1.00 BUNCO P RUNCMP BOLD 16 joints of 2 7/8" tubing having been identified as bad. (galled threads etc.) 08:30 - 09:30 1.00 BUNCO P RUNCMP Unable to re-load spooler unit with full roll of cable due to cold weather limitations on operating of loader. Ambient tem erature ~ -46 de F. Rig down elephant trunk and prep for new completion. 09:30 - 22:00 12.50 BUNCO WAIT RUNCMP WOW. Minimums for operation of forklift and lifting equipment is -35 deg F. 22:00 - 23:30 1.50 BUNCO P RUNCMP Remove old spool of ESP cable and install spool of ESP cable to be ran. 23:30 - 00:00 0.50 BUNCO P RUNCMP PSJM for P/U ESP. 1/26/2008 00:00 - 04:30 4.50 BUNCO P RUNCMP P/U and M/U ESP, Service and plug in cable and test. Install 5 protectalizers and 3 flatguards. 04:30 - 06:00 1.50 BUNCO RUNCMP RIH with ESP on 2-7/8" Tbg. 06:00 - 07:30 1.50 BUNCO RUNCMP PU 20 joints of "new" Class B 2 7/8" tubing to replace damaged pipe. PU 10 joints of tubing which were laid down when breaking out bad tubing. 07:30 - 15:00 7.50 BUNCO P RUNCMP RIH w/ ESP on 2 7/8" tubing from Derrick. Continuous hole fill as RIH. MU torque of 2300 ft-Ibs on tubing. Check ESP cable every 2000', and load tubing w/ SW. Losses ~ 14 Bbls / Hr. 80 stds out of 162 in hole ~ 12:30. 15:00 - 17:00 2.00 BUNCO P RUNCMP 8000' of Cable and BHA RIH on 2 7/8" Tbg. Centrilift make cable splice and check cable. 17:00 - 21:00 4.00 BUNCO RUNCMP Resume RIH w/ ESP on 2 7/8" Tbg from Derrick to 10,270'. Losses ~ 14 Bbls / Hr. 21:00 - 21:30 0.50 BUNCO RUNCMP Fill tubing and pump 10 bbls of SW 1 bpm ~ 1,200 psi. 21:30 - 22:00 0.50 BUNCO RUNCMP M/U hanger and landing joint. Cut ESP cable. 22:00 - 00:00 2.00 BUNCO RUNCMP Make final splice and attach to penetrator. Test ESP cable. 1/27/2008 00:00 - 01:30 1.50 BUNCO P RUNCMP Land hanger, RILDS. Completion bottom at 10,306'. P/U weight 85,000#, S/O weight 46,000#. M/U torque for tubing was 2,300 ft/Ibs. 167 LaSalle clamps RIH 01:30 - 02:30 1.00 BUNCO P RUNCMP 2-1/2" CIW H type TWC installed by CIW wellhead tech. 02:30 - 04:00 1.50 WHSUB P WHDTRE Test TWC from above to 3,500 psi for 30 minutes and from below to 500 psi for 30 minutes. Injection rate at 1-1/2 bpm 04:00 - 06:00 2.00 BOPSU P WHDTRE Blow down and unhook lines to BOPE. 06:00 - 10:00 4.00 BOPSU P WHDTRE ND BOPE, place on stump, lay down BOPE. At 9:30 while lifting a drum of boiler chemical on pallet lift pits, mechanical/structural failure of lift resulting of drop of 30 gal plastic chemical drum +/- 20 to the ground. +/- 10 gal of Aqua Mate 110 (Boiler water treatment chemical) spilled onto the ground. Notified MPU, Enviro, and ADW supervisor. 10:00 - 11:30 1.50 BOPSU P WHDTRE Cordon off spill area. Gather information and MSDS data. Floor crew continue to PU and NU tree. 11:30 - 12:00 0.50 BOPSU P WHDTRE Centrilift make final penetrator /cable checks. 3015 psi BHP / Motor temp 166.5 deg F, intake temp 164.2 deg F, phase to phase = 3.8 /phase to ground is infinity / 725 meg for 3 min. MPU SRT team on location to deal with handling of chemical spill. 12:00 - 14:30 2.50 BOPSU P WHDTRE CIW test hanger void to 5000 psi and chart for 30 minutes. Deal with spill and cleanup. Fill tree with diesel for pressure test. Thaw out pressure test hose. Printed: 2/4/2008 11:21:36 AM • • BP EXPLORATION Page 4 of 4 Operations Summary Report Legal Well Name: MPL-13 Common Well Name: MPL-13 Spud Date: 4/23/1993 Event Name: WORKOVER Start: 1/18/2008 End: 1/27/2008 Contractor Name: NABOBS ALASKA DRILLING I Rig Release: 1/27/2008 Rig Name: NABOBS 3S Rig Number: I I ~ Date , From - To Hours !~ Task ' Phase Description of Operations Code NPT 1/27/2008 14:30 - 15:00 0.50 BOPSU P WHDTRE Test tree to 5000 psi and chart for 5 minutes. 15:00 - 17:00 2.00 BOPSU P WHDTRE PUMU lubricator to pull TWC. Unable to cycle IA valves or screw into TWC. Suspect ice in profile. Wrap tree with visqueen and position tioga with heat, and apply steam. 17:00 - 18:30 1.50 BOPSU P WHDTRE Pull TWC. Tbg and IA on vacuum. Shoot fluid level @ 950'. Dry rod BPV in. Remove secondary annulus valve and secure cellar. Rig released (~ 18:30 hours on 1 /27/2008 Printed: 2/4/2008 11:27:36 AM i ~ STATE tJF ALASKA ~v~aio7 OIL AND CHAS CONSERI/ATIC)N COMMISSION BOPE Test Report Submit to: Contractor: Nabars Rig Rep.: J. Greco / J.Fritts Operator: BP Rep.: J.Menke/ B.Burson Field/Unit & Well No.: MPU L-13 Operation: Drag: Test: Initial: X Test Pressure: Rams: 250/35 Rig No.: 3S Rig Phone: 659-4487 Op. Phone: 659- 4485 PTD # 1930120 Workover: X Weekly: Annular 250/3500 TEST DATA MISC. INSPECTIONS: Test Result Test Result Location Gen.: P Wetl Sign P Housekeeping: P Drl. Rig P PTD On Location P Hazard Sec. P Standing Order Posted P BOP STACK: Quantity Size Test Result Annular Preventer 1 13 518 5000 P Pipe Rams 1 2 778 FP Lower Pipe Rams Blind Rams 1 Bknd P Choke Ln. Valves 1 31/8" 5000 P HCR Valves 2 3118" 5000 P Kill Line Valves 1 2 1/96" 5000 P Check Valve 0 NA DATE.; 1123/2008 Rig Fax: 659- 4486 Op. Fax: 659-4628 Explor.: Bi-Weekly _-- Valves: 250/3500 FLOOR SAFETY VALVES: Quantity Test Result Upper Kefty 1 P Lower Kelly 1 P Baq Type 1 P Inside BOP 1 P CHOKE MANIFOLD: Quantity Test Result No. Valves 13 FP Manual Chokes 1 P Hydrau~ Chokes 1 P ACCUMULATOR SYSTEM: Time/Pressure Test R System Pressure 3000 P Pressure After Closure 1700 P MUD SYSTEM: V~suat Test Alarm Test 200 psi Attained 30 sec P Trip Tank P P Full Pressure Atta~ed 2 min15 sec P Pit Level Indicators P P Blind Switch Covers: AN stations P Flow Indicator P P Niue. Battles (avg}: 1900 psi Meth Gas Detector P P H2S Gas Detector P P Test Results Number of Fai{ures: 2 Test Time: 7.00 Hours Comyonents tested ALL Repair or replacement of e~merrt w~ be made wit days. Notify the North Slope Inspector 659-3607, follow with written c~nf~mation to Superviser at: Remarks: ~ Vairble bore rams fai{ed -removed vbr and urstatied 2 718 rams retest. test ok.(2) fiancee on valve #13 on choke manifold leaked - tis~hten fiancee on coke valve 13 and re #est - test ok 24 H01JR NOTICE YES X NO Date Trme BOP Test (for rigs) BFL 11/14/07 start 22:30 Finish ~(~~~~Q JAN ~~ ~. 200 By ! Witness Chuck Sheve Fritts/B. Burson Nabors 3S BOP Test 1-23-08 Revised.xls STATE OF ALASKA ALASK/~"' IL AND GAS CONSERVATION C~" .MISSION REPORT OF SUNDRY WELL OPERATIONS 1. Type of Request: [] Abandon [] Suspend [] Operation Shutdown [] Perforate [] Variance [] Othe~ [] Alter Casing [] Repair Well r"l Plug Perforations I-I stimulate [] Time Extension Change out ESP [] Change Approved Program [] Pull Tubing [] Perforate New Pool [] Re-Enter Suspended Well [] Annular Disposal 2. Operator Name: 4. Current Well Class: 5. Permit To Drill Number BP Exploration (Alaska) Inc. [] Development [] Exploratory 193-012 3. Address: [] Stratigraphic [] Service 6. APl Number: P.O. Box 196612, Anchorage, Alaska 99519-6612 50-029-22335-00-00 7. KB Elevation (ft): KBE = 51' 9. Well Name and Number: MPL-13 8. Property Designation: 10. Field / Pool(s): ADL 025509 Milne Point Unit / Kuparuk River Sands 11. Present well condition summary Total depth: measured 11016 feet true vertical 7409 feet Plugs (measured) None Effective depth: measured 10898 feet Junk (measured) None true vertical 7331 feet Casing Length Size MD TVD Burst Collapse Structural Conductor 110' 13-3/8" 110' 110' 2730 1130 Su trace 6086' 9-5/8" 6086' 4409' 6870 4760 Intermediate Production 10996' 7" 10996' 7396' 7240 5410 Liner Perforation Depth MD (ft): 10498' - 10719' Perforation Depth TVD (ft): 7072'- 7213' Tubing Size (size, grade, and measured depth): 2-7/8", 6.5# L-80 10302' Packers and SSSV (type and measured depth): None None 12. Stimulation or cement squeeze summary: N/A Intervals treated (measured): ...... , Treatment description including volumes used and final pressure: '-:,~!'I it ,:7::-~,~ .. ,~:.~ ~.. ~ .... 'i 3. Representative Daily Average ProdUctiOn O'r' njection 'Data . Oil-Bbl Gas-Mcf Water-Bbl Casin,Cl'-Press'ur~e~ Tubin,q Pressure Prior to well operation: 283 52 211 Subsequent to operation: 290 50 226 14. Attachments: 15. Well Class after proposed work: [] Copies of Logs and Surveys run [] Exploratory [] Development [] Service [] Daily Report of Well Operations 16. Well Status after proposed work: [] Oil [] Gas [] WAG [] GINJ [] WINJ [] WDSPL ii 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. I Sundry Number or N/A if C.O. Exempt: Contact Robert Odenthal, 564-4387I NIA Printed Name Sondra Stewman Title Technical Assistant ~~~..-'(~?"~_-~, ..........~ ~..., v ~:~~ .... ~ Prepared By Name/Number: · . 2_ " Phone "'C, S~gn .____._ 564-4750 Date ~/-"~' '( ~ .-~ Sondra Stewman, 564-4750 Form 10-404 Revised 2/2003 ORIGINAL BP EXPLORATION Page 1 Of 3 Operations Summa Report Legal Well Name: MPL-13 Common Well Name: MPL-13 Spud Date: 4/23/1993 Event Name: WORKOVER Start: 7/30/2003 End: 8/3/2003 Contractor Name: NAB©RS DRILLING CO. Rig Release: 8/3/2003 Rig Name: NABQRS 4 Rig Number: 4ES Date From -To Hours Task Code NPT Phase Description of Operations 7/30/2003 03:00 - 04:30 1.50 MOB ~ PRE Held PJSM. Rigged Down. Scoped Down and L / D Derrick. 04:30 - 06:00 1.50 MOB ~ PRE Broke Apart Rig Modules. Prepared to Move Rig. 06:00 - 06:30 0.50 MOB ~ PRE Held PJSM w/Security, CPS, Truck Drivers and Drilling Crew. 06:30 - 19:00 12.50 MOB P PRE Moved Rig from J-26 to MPL-13. 19:00 - 21:00 2.00 MOB P 'PRE Moved and Spotted Sub Over MPL-13. Spotted Pit Module, Pipe Shed and Camp. Bermed Rig. 21:00 - 22:00 1.00 MOB P PRE Held PJSM. Raised and Scoped Derrick. R / U Derrick and Rig ~Floor. 22:00 - 23:00 1.00 PULL P DECOMP R / U Lines to Tree and Wellhead. R / U Tiger Tank and Hardlines. Took on Sea Water. Accepted Rig at 2200 hrs 7 / 31 / 2003. 23:00 - 23:30 0.50 PULL P DECOMP Held PJSM. R / U DSM Lubricator, Pulled BP¥, R / D DSM. 23:30 - 00:00 0.50 PULL P DECOMP Finished R / U to Tree. Tested Hardlines to 3,000 psi, OK. 7/31/2003 00:00 - 00:30 0.50 PULL P DECOMP Held Pre Spud Meeting. Tubing 800 psi, Annulus 710 psi. 00:30 - 01:30 1.00 PULL P DECOMP Lined Up Annulus Through Choke. Opened Choke and Bled Down Annulus to 0 psi. Tubing 0 psi. 01:30 - 04:00 2.50 PULL P DECOMP Displaced Well to 140 deg Seawater, Pump Rate 5 bpm, 1,750 psi. Total Volume Pumped 575 bbls. Average Fluid Loss 20 bph. 04:00 - 04:30 0.50 PULL P DECOMP Monitored Well, Well Static. 04:30 - 06:00 1.50 WHSUR P DECOMP Set TWC. Tested TWC by Bullheading Down Annulus, Injection Rate 3 bpm, 1,400 psi. 06:00 - 07:30 1.50 WHSUR P DECOMP Held PJSM. Monitored Well, Well Static. 07:30 - 09:00 1.50 WHSUR P DECOMP N / D Production Tree 09:00-11:00 2.00 BOPSUI;P DECOMP HeldPJSM. N / U13-5/8" x 5,000 psi BOP Stack. Hydril Annular Preventer, Blind Rams, Mud Cross, Lower Pipe Rams w/2-7/8" x 5" Variable Rams. 11:00 - 14:30 3.50 BOPSUF P DECOMP Held PJSM. Tested BOPE. Tested Lower Rams, Blind Rams, Choke Manifold, Valves, HCR, Kill Line, Choke Line, Floor Valves and IBOP to 3,500 psi High / 250 psi Low. Tested Annular Preventer to 2,500 psi High / 250 psi Low. All Tests Held f/5 Min. All Pressure Tests Held w/No Leaks or Pressure Loss. Performed Accumulator Test. Witness of BOP Test Waived by AOGCC Rep Lou Gramaldi. 14:30 - 15:30 1.00 WHSUR P DECOMP Held PJSM. R / U DSM Lubricator, Pulled TWC, R / D DSM. Tubing on Vacuum, Annulus had Slight Flow of Crude Oil. Wellbore Fluids Out of Balance. 15:30 - 16:00 0.50 PULL P DECOMP M / U 3-1/2" DP and XO to Tubing Hanger. M / U to Tubing Hanger. M / U Circulating Head and Line. BOLDS. Pulled Hanger Offseat, String Weight Up 76,000#. 16:00 - 17:30 1.50 PULL P DECOMP Circulated Wellbore to Balance Wellbore Fluids. Pump Rate 3.5 bpm, 800 psi. Total Volume Pumped 403 bbls w/No Losses. Observed Slight Show of Gas on Bottoms Up. 17:30 - 18:00 0.50 PULL P DECOMP Monitored Well, Well Static. 18:00 - 18:30 0.50 PULL P DECOMP Held PJSM. Pulled Tubing Hanger to Floor w/76,000# Up Weight. Tested ESP Cable, OK. Terminated ESP Cable. Broke Out and L / D Landing Joint and Tubing Hanger. 18:30 - 22:30 4.00 PULL P :DECOMP POOH w/2-7/8" Tubing. Racked Tubing in Derrick. Spooled Up ESP Cable. 22:30 - 23:30 1.00 PULL P I DECOMP Changed Out ESP Cable Spool. 23:30 - 00:00 0.50 PULL P DECOMP POOH w/2-7/8" Tubing. Racked Tubing in Derrick. Spooled Up ESP Cable. 8/1/2003 00:00 - 04:30 4.50 PULL P DECOMP POOH w/2-7/8" Tubing. Racked Tubing in Derrick. Total Fluid Printed: 8~4~2003 9:08:35 AM BP EXPLORATION Page 2 of 3 Operations Summa Report Legal Well Name: MPL-13 Common Well Name: MPL-13 Spud Date: 4/23/1993 Event Name: WORKOVER Start: 7/30/2003 End: 8/3/2003 Contractor Name: NABORS DRILLING CO. Rig Release: 8/3/2003 Rig Name: NABORS 4 Rig Number: 4ES Date From - To Hours Task Code NPT Phase Description of Qperations 8/1/2003 00:00 - 04:30 4.50 PULL P DECOMP Lost While POOH 85 bbls. 04:30 - 07:00 2.50 PULL P DECOMP Terminated ESP Cable to Pump. Broke Out and L / D Pump. 07:00 - 08:00 1.00 PULL P DECOMP Cleared and Cleaned Rig Floor. Loaded New ESP Cable into Spooling Unit. Monitored Well, Gas Percolating at Bell Nipple, Slight Flow of Crude Oil. Shut In Well and Flowed Through Gas Buster. Well Flowed 4 bbls in 30 Minutes Then Went Static. Shut in Well and Monitored Pressure. 08:00 - 11:30 3.50 KILL N DPRB DECOMP Monitored Well Pressure, SICP 20 psi Immediately, SICP 120 3si after 4 hours. Discussed Well Control Situation w/ Anchorage Team. Weighted Up Fluid in Pits to 9.0 ppg. Ordered Out 300 bbls of 9.0 ppg Brine from Plant. Prepared to Bullhead 9.0 ppg Brine Down Wellbore. 11:30 - 12:00 0.50 KILL N DPRB DECOMP Held PJSM w/Rig Crew. 12:00 - 13:30 1.50 KILL N DPRB DECOMP ' Bullheaded 150 bbls of 9.0 ppg Brine Down Wellbore. Pump Rate 3 bpm, 1,550 psi. 13:30 - 16:00 2.50 KILL N DPRB DF:COMP S / D Pump. Monitored Well Through Choke Line to Gas Buster. Well Flowed Back 4 bbls in 5 Minutes, 70% crude. Flow Decreased to 0.5 bbls in 5 Minutes Over Next Hour. Flow Decreased to 0.2 bbls in 5 Minutes Over Next Hour. Wellbore Fluid Static Over Next 1/2 Hour. Observed Gas Percolating at Surface with Static Fluid Level. 16:00 - 18:30 2.50 KILL N DPRB DECOMP Held PJSM. RIH Open Ended w/2-7/8" Tubing to 6,400'. Percolating Gas Increased w/Very Slight Flow of Crude Oil From Bell Nipple. 18:30 - 19:30 1.00 KILL N DPRB DE[COMP M / U Circulating Head and Line. Circulated Bottoms Up from 6,400' w/9.0 ppg Brine. Pump Rate 5 bpm, 970 psi. Shut Down Pump and Monitored Well. Fluid Level Dropping in Wellbore w/ Very Slight Show of Gas at Surface. 19:30 - 00:00 4.50 KILL N DPRB DE[COMP RIH Open Ended w/ 2-7/8" Tubing to 10,453' ~8/2/2003 00:00 - 03:00 3.00 KILL N DPRB DECOMP M / U Circulating Head and Line. Displaced Wellbore to 9.0 ppg Brine. Pump Rate 5 bpm, 1,700 psi. Discarded 315 bbls of 8.5 ppg SW to Tiger Tank. Circulated Wellbore 2 Full Circulations w/9.0 ppg Brine. No Gas to Surface. Losses 10 bph. 03:00 - 04:30 1.50 KILL N DPRB DECOMP Monitored Well. Fluid Level Dropped 15 bbls in 1-1/2 Hours. 04:30 - 10:00 5.50 KILL N DPRB DECOMP POOH w/2-7/8" Tubing. Replaced 12 Bad Joints. Total Fluid Lost 52 bbls. 10:00 - 10:30 0.50 RUNCOr~I COMP Held PJSM. Cleared Rig Floor. R / U Power Tongs. Ran ESP Cable Through Sheave. .10:30 - 12:00 1.50 RUNCOI~,I COMP M / U ESP Assembly. '12:00 - 12:30 0.50 RUNCOr~I COMP Connected MLE to ESP Pump and Secured. Tested Cable. OK. 12:30 - 17:30 5.00 RUNCOI~I COMP RIH w/ESP Pump and Cable on 2-7/8" 6.5# 8rd Tubing. M / U Torque 2,350 ft / lbs. Tested Cable and Pumped 10 bbls 9.0 ppg Brine Down Tubing to Ensure Tubing was Clear of Debris , Every 2,000'. 17:30 - 18:00 0.50 RUNCOr~I COMP Changed Out Cable Spools in Spooling Unit. 18:00 - 21:00 3.00' RUNCOr~ COMP ~ Spliced and Tested Cable. OK. Pumped 10 bbls 9.0 ppg Brine Down Tubing to Ensure Tubing was Clear of Debris. 21:00 - 23:30 2.50 RUNCOI~I COMP RIH w/ESP Pump and Cable on 2-7/8" 6.5# 8rd Tubing. M / U Torque 2,350 ft / lbs. Tested Cable and Pumped 10 bbls 9.0 ppg Brine Down Tubing to Ensure Tubing was Clear of Debris Every 2,000'. 23:30 - 00:00 0.50 RUNCO~ COMP M / U Tubing Hanger and Installed Penetrator. Prepared to Printed: 8/4/2003 9:08:35AM BP EXPLORATION Page 3 of 3 Operations Summary Report Legal Well Name: MPL-13 Common Well Name: MPL-13 Spud Date: 4/23/1993 Event Name: WORKOVER Start: 7/30/2003 End: 8/3/2003 Contractor Name: NABQRS DRILLING CC). Rig Release: 8/3/2003 Rig Name: NABORS 4 Rig Number: 4ES Date From -To Hours Task Code NPT Phase Description of Operations -- 8/2/2003 23:30 - 00:00 0.50 RUNCOI~I COMP Make Cable Connector Splice. 8/3/2003 00:00 - 01:30 1.50 RUNCOr~ COMP M / U EFT Connector Splice, Attached Cable and Tested, OK. 01:30 - 02:00 0.50 RUNCOI~ COMP String Weight Up 73,000#, String Weight Down 52,000#. Landed Tubing Hanger and RILDS. Completion Equipment Set At The Following Depths: Item Length Depth ESP Pump Assembly 57.56' 10,301.60' 2-7/8" 6.5# 8rd EUE Pup Jt 10.00' 10,234.04' 1 Jt 2-7/8" 6.5# 8rd EUE Tbg 31.39' 10,202.65' XN Nipple 1.05' 10,201.60' #1 GLM Assembly 26.57' 10,175.03' 240 Jts 2-7/8" 6.5# 8rd EUE Tbg 7,58128' 2,593.75' 2-7/8" 6.5# 8rd EUE Pup Jt 4.03' 2,589.72' 77 Jts 2-7/8" 6.5# 8rd EUE Tbg 2,432.84' 156.88' #2 GLM Assembly 26.57' 130.31' 3 Jts 2-7/8" 6.5# 8rd Tbg 94.46' 35.85' 2-7/8" 6.5# 8rd EUE Pup Jt 9.98' 25.87' Tubing Hanger 4.40' 21.47' 02:00 - 02:30 0.50 WHSUR 3 COMP Broke Out and L / D Landing Joint. Set TWC and Tested. 02:30 - 03:30 1.00 BOPSUF N HMAN COMP Peak Truck Overfilled and Spilled 30 gallons of Brine and Crude Oil onto Pad. Shut Down Rig Operations and Assisted w/Clean Up. See IR #583629. 03:30 - 05:00 1.50 BOPSUF.P COMP Held PJSM. Drained BOP Stack and Blew Down Lines. N / D BOPE. 05:00 - 06:00 1.00 WHSUR P COMP Held PJSM. N / U Production Tree. 06:00 - 06:30 0.50 WHSUR P COMP Tested Hanger, Neck Seal and Void to 5,000 psi, OK. Tested Tree to 5,000 psi, OK. 06:30 - 07:30 1.00 WHSUR P COMP Held PJSM. R / U DSM Lubricator, Pulled TWC, Set BPV, R / D DSM. Tubing Pressure 0 psi, Casing 0 psi. 07:30 - 08:00 0.50 WHSUR P COMP Secured Well, Released Rig 0800 hrs 8 / 03 / 2003. Printed: 8/4/2003 9:08:35AM /?¢ol MEMORANDUM TO: THRU: Julia Heusser, Commissioner Tom Maunder, P. I. Supervisor State of Alaska Alaska Oil and Gas Conservation Commission DATE: December 22, 2000 FROM: John Crisp, SUBJECT: Petroleum Inspector Safety Valve Tests Milne Point Field L Pad December 22, 2000: I traveled to BPX's Milne Point Field L Pad to witness Safety Valve System tests. I conducted wellhouse inspections during SVS tests. Larry Niles was BP rep. in charge of SVS testing. As usual, Larry was ready to begin testing as soon as I arrived on location. Wellhouses on L Pad are heated & have lights, this makes for safe working conditions & minimal SVS failures. Wellhouses are clean'& in good condition. The AOGCC test report is attached for SVS failure reference. SUMMARY: I traveled to BPX MPU L Pad for SVS tests. 20 wells, 40 components tested. I Failure witnessed. 2.5% failure rate. 20 wellhouses inspected. No failures to report. Attachments: SVS MPU L pad 12-22-00jc ,cc; NON-CONFIDENTIAL SVS MPU L Pad 12-22-OOjc.doc AlaSka Oil and Gas Conservation Commission Safety Valve System Test Report Operator: BPX Operator Rep: ,Larry Niles AOGCC Rep: John Crisp Submitted By: John Crisp Field/Unit/Pad: PBU MPU L Pad Separator psi: LPS 140 Date: 12/22/00 HPS Well Permit Separ Set L/P Test Test Test Date Oil, WAG, GIN J, Number Number PSI PSI Trip Code Code Code Passed GAS or CYCLE L-ol 1840050 ' ' L-02 1~00060 140 100 90 P P " OIL L-03 1900070 L-04 1900380 140 100 105 P P OIL L-05 1900390 140 . 100 100 P P OIL L-06 1900100 140 100 100 P P ' ~IL L-07 1900370 140 100 100 P P OIL L-08 1901000 4000 2000 1950 P P WAG. , L-09 1901010 L-11 1930130 140 100 115 P P OIL L-12 1930110 140 100 100 P P OIL L-13 1930120 140 100 100 P P OIL L-14 1940680 140 100 95 P P OIL L-15 1940620 L-16A 1990900 L-17 1941690 L-20 1971360 140 100 100 P P OIL L-25 1951800 140 100: 105 P P OIL L-28A 1982470 140 100 110 P P OIL L-29 1950090 .... 140 100 95 P P OIL L-32 1970650 140' 100! 100 P P OIL ,, L-33 1971050 L-35 1970920! 140 100 ' 105 P P OIL L-36 ' 1971480 1401 i00 105 . P P 0IL L-37A 1980560' L-40 198oioo 'L140 100 '100 p p ~\~~x,,~ " OIL L-45 1981690 '140 100 105 P e [x~' 0IL L-34 1970800 4000 2000 1900 e 4! WAG Wells: 20 Components: 40 Failures: 1 Failure Rate: 2.5% Elgo var Remarks: Page 1 of 2 SVS MPU L Pad 12-22-OOjc.xls Well Permit Separ Set ! L/P Test Test Test Date Oil, WAG, GIN J, Number Number PSI PSI Trip Code Code Code Passed GnS or CYCLe: i 12/26/00 Page 2 of 2 SVS MPU L Pad 12-22-OOjc.xls ,~..~ STATE OF ALASKA ~.--.. , , ALASKA ;.~. L AND GAS CONSERVATION CO...,'IlSSION REPORT OF ,SUNDRY WELL OPE. RATION,S 1. Operations performed: 2. Name of Operator BP Exploration (Alaska) Inc. 3. Address P.O. Box 196612, Anchorage, Alaska 99519-6612 [] Operation Shutdown [] Stimulate [] Plugging [] Pull Tubing []Alter Casing [] Repair Well []Other 5..Type I~ well: Development [] Exploratory [] Stratigraphic [] Service 4. Location of well at surface 1916' SNL, 136' EWL, SEC. 08, T13N, R10E, UM At top of productive interval 3758' NSL, 4309' WEL, SEC. 06, T13N, R10E, UM At effective depth 3968' NSL, 4532' WEL, SEC. 06, T13N, R10E, UM At total depth 4028' NSL, 4597' WEL, SEC. 06, T13N, R10E, UM 11016 feet 7409 feet 10898 feet 7331 feet Length Size Plugs (measured) [] Perforate Change Out ESP 110' 6086' 6. Datum Elevation (DF or KB) KBE = 51' 7. Unit or Property Name Milne Point Unit 8. Well Number MPL-13 9. 10. APl Number 50- 029-22335-0~ 11. Field and Pool Milne Point Unit / Kuparuk River r~ r f, I,. Ill il" i~nds I~,l;:~C I V E IJ 12. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical Casing Structural Conductor Surface Intermediate Production Liner DEC 17 1999 Permit Number / Approval No. 193-012 TVD Junk (measured) Almd~OII & Gas Cons. Commission Anchorage Cemented MD 13-3/8" 300 sx Arctic I 110' 9-5/8" 1780 sx Arctic Set III, 300 sx Class 'G' 6086' 10996' 7" 325 sx Class 'G' 10996' Perforation depth: measured true vertical 10498'-10518', 10529'-10539', 10554'-10564', 10598'-10618', 10626'-10656', 10669'-10719' 7072'-7084', 7091'-7098', 7107'-7113', 7135'-7148', 7153'-7172', 7180'-7213' Tubing (size, grade, and measured depth) 2-7/8", 6.5#, L-80 to 10300' Packers and SSSV (type and measured depth) 7" Baker 'D' packer at 10453'; 3-1/2" Camco 'D' nipple at 10490' with 3-1/2" tubing tail to 10493' 13. Stimulation or cement squeeze summary 0RIGINA'"L Intervals treated (measured) Treatment description including volumes used and final pressure 14o Prior to well operation: Subsequent to operation: Representative Daily Average Production or Injection Data OiI-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure 15. Attachments [--] Copies of Logs and Surveys run [] Daily Report of Well Operations 16. Status of well classifications as: [] Oil I--] Gas F-] Suspended Service 17. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed TerrieHubble ~/'~_~. ~ Title Technical Assistant III _ . _ Prepared By Name/Number: Date )~'~/J '7/¢.? Terrie Hubble, 564-4628 ~ ~n ~)uplicate...].~ Form 10-404 Rev. 06/15/88 Facility Date/Time 14 Nov 99 15 Nov 99 M Pt L Pad Duration 6 hr 6 hr 18:00-00:00 18:00-00:00 00:00 00:00-01:30 00:00-01:30 01:30 01:30-02:30 01:30-02:30 02:30 02:30-06:00 02:30-06:00 06:00 06:00-10:00 06:00-10:00 10:00 10:00-13:00 10:00-13:00 1-1/2 hr 1-1/2 hr 1 hr lhr 3-1/2 hr 3-1/2 hr 4 hr 4 hr 3 hr 3 hr 13:00 13:00-13:30 13:00-13:30 13:30 13:30-14:30 13:30-14:30 14:30 14:30-16:30 14:30-16:30 16:30 16:30-18:30 16:30-18:30 18:30 1/2 hr 1/2 hr 1 hr lhr 2hr 2 hr 2 hr 2 hr Progress Report 18:30-19:00 18:30-19:00 19:00 19:00-05:00 19:00-05:00 Well MPL- 13 Page 1 Rig Nabors 4ES Date 06 December 99 16 Nov 99 05:00 05:00-06:00 05:00-06:00 06:00 06:00-09:00 06:00-09:00 1/2 hr 1/2 hr 10hr lO hr 1 hr 1 hr 3 hr 3 hr Activity Move rig Rig moved 100.00 % At well location - Slot Fluid system Fill pits with Seawater rig tiger tanks & take on sea water. Completed operations Wellhead work Removed Hanger plug Equipment work completed Repair Repaired High pressure lines Hold well kill risk assestment meeting & attempt to test lines found unibolt on mudline leaking & repair same. High pressure lines failed - Change operation Repair (cont...) Repaired High pressure lines Equipment work completed Well control Circulated closed in well at 9996.0 ft SITP=450 Sicp=1050 & circ. influx from well bore to tiger tank and replace well fluids with sea h20 Hole displaced with Seawater - 150.00 % displaced Wellhead work Installed Hanger plug Test same to 2500 psi. Equipment work completed Wellhead work Removed Xmas tree Equipment work completed Nipple down BOP stack Removed BOP stack Equipment work completed Test well control equipment Tested BOP stack Pressure test completed successfully - 3500.000 psi test waived by John Spaulding with AOGC Wellhead work Removed Hanger plug Equipment work completed Pull Single completion, 2-7/8in O.D. Pulled Tubing in stands to 0.0 ft Pull hanger & check & trouble shoot spooler hydraulic problems. & pooh Lost 3-flat guards & 10-bands in well bore. Completed operations Slickline wireline work RECEIVED 1999 ~chot'~le Conducted slickline operations on Slickline equipment - Retrival run Rig up for HES GR/JB run. Stopped: To hold safety meeting Slickline wireline work (cont...) Conducted slickline operations on Slickline equipment - Retrival run Facility M Pt L Pad Progress Report Well MPL-13 Page 2 Rig Nabors 4ES Date 06 December 99 Date/Time 17 Nov 99 09:00 09:00-01:30 09:00-01:30 01:30 01:30-02:00 01:30-02:00 02:00 02:00-04:00 02:00-04:00 04:00 04:00-06:00 04:00-06:00 06:00 06:00-07:00 06:00-07:00 07:00 07:00-08:00 07:00-08:00 08:00 08:00-06:00 08:00-14:00 14:00 Duration 16-1/2 hr 16-1/2 hr 1/2 hr 1/2 hr 2 hr 2 hr 2 hr 2 hr 1 hr 1 hr 1 hr 1 hr 22 hr 6 hr Activity Completed run with Junk basket/gauge ring from 0.0 ft to 10400.0 ft Run Single completion, 2-7/8in O.D. Ran Tubing in stands to 13192.0 ft Completed run with ESP to 13192.0 ft Wellhead work Installed Tubing hanger Equipment work completed, seal energised Nipple down BOP stack Removed BOP stack Equipment work completed Wellhead work Installed Xmas tree Equipment work completed Wellhead work Tested Xmas tree Pressure test completed successfully - 5000.000 psi Fluid system Freeze protect well - 75.000 bbl of Diesel Completed operations Suspend operations Rig waited: Whiteout / Phase 3 Resumed operations Rig Released to Move to MPL~16 11/17/99 (LGM) RECEIVED 1999 STATE OF ALASKA .~.._ASKA OIL AND GAS CONSERVATION COMMi~oION REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown __ Stimulate__ Plugging Pull tubing x Alter casing Repair well Perforate__ Other x Replace ESP 2. Name of Operator BP Exploration (Alaska) Inc. 3. Address P. 0. Box 196612, Anchorage, Alaska 99519-6612 4. Location of well at surface 1916' SNL, 136' EWL, SEC. 8, T13N, RIOE At top of productive interval 1521'SNL, 4329' WEL, SEC. 6, T13N, RIOE At effective depth At total depth 1250'SNL, 4619' WEL, SEC. 6, T13N, RIOE 5. Type of Well: Development X Exploratory Stratigraphic __ Service 6. Datum elevation (DF or KBi KBE = 51' feet 7. Unit or Property name Mi/ne Point Unit 8. Well number MPL - 13 9. Permit number/approval number 93-12~Conservation order 347 10. APl number 50- 029-22335 11. Field/Pool Milne Point -Kuparuk Sands 12. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical Casing Length Structural Conductor Surface Intermediate Production Liner Perforation depth: measured true vertical feet Plugs (measured) feet feet Junk (measured) feet Size Cemented ORIGINAL Measured depth True vertical depth RECEIVED MAR 1 4. 199,5 ~Jas[~.Oii & Gas Cons. Commission Tubing (size, grade, and measured depth) 2-7/8", L-80 EUE 8rd tubing to 10000' MD w/Centrilift ESP to 10039' MD Packers and SSSV (type and measured depth) 7" Baker model "D" packer @ 10453' MD; 3-1/2" Camco "D" nipple @ 10490' MD w/3-1/2" tubing tail to 10493' MD 13. Stimulation or cement squeeze summary Intervals treated (measured) Treatment descriPtion including volumes used and final pressure 14. Prior to well operation Subsequent to operation Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcr Water-Bbl Casing Pressure Tubing Pressure 15. Attachments Copies of Logs and Surveys run __ Daily Report of Well Operations x 16. Status of well classification as: Oil × Gas Suspended Service 17. I hereby ~ertify that the foregoing is true and correct to the best of my knowledge. Signed /~/~.~ ~ ,,'~ ~ . Title. Drilling En~lineer Supervisor Form 10-404.~'v 06/15/88 SUBMIT IN DUPLICATE SERVICE WELL: MP L-13 BOROUGH: NORTH SLOPE UNIT: UNKNOWN FIELD: UNKNOWN LEASE: API: 50- PEP, MI T: APPROVAL: DAILY OPERATIO~ ACCEPT: SPUD: RELEASE: OPERATION: DRLG RIG: NABORS 4ES WO/C RIG: NABORS 4ES PAGE: 1 02/19/95 ( 1) TD:ll016 PB:10868 02/20/95 (2) TD:ll016 PB:10868 02/21/95 (3) TD: 11016 PB: 10868 MOVING RIG T/-PAD MW: 0.0 RD MUD LINES & FLOW LINE F/30' CENTER. SCOPE DOWN & LD DERRICK. MOVE PIPE SHED, PITS & SUB BASE OFF J-13I, MOVE TO L-PAD. WAIT ON THE CAMP MOVE F/27E. SET TWC TO TEST BOPE. MW: 0.0 WO 27E TO MOVE SHOP & CAMP. LAY HERCULITE. SPOT RIG COMPONENTS ON L-13. RAISE & SCOPE DERRICK, RU SAFETY EQUIPMENT. BERM AROUND RIG. ACCEPT RIG @ 1400 2/19/95. CHECK WELL FOR PRESSURE. SITP & CP: 0 PSI. ND TREE AND ADAPTER. NU BOPE, ADAPTER FLANGE, & GRAY LOC CLAMP. RU RISER & FLOWLINE. XO VALVE IN CHOKE MANIFOLD. CHANGE PIPE RAMS F/3.5 - 3-7/8". RU RISER & SCREW INTO HANGER. RU LUBRICATOR & PULL BPV. BLEED OFF 300 PSI GAS TO FLOW TANK. SET TWC. PULLING HANGER MW: 0.0 FINISH SET TWC & RD LUBRICATOR. TEST BOPE TO 250/5000 PSI; ANNULAR TO 250/3500 PSI. WITNESSING WAIVED BY DOUG AMOS - AOGCC. HAD TO CHANGE OUT FLANGED KILL LINE HOSE. NEW HOSE ORDERED. GIVEN VERBAL VARIANCE BY BOBBY FOSTER - AOGCC, TO USE HAMMER UNIONS. LD TEST JT. RU LUBRICATOR & PULL TWC. SHEAR PUMP OPEN PLUG W/2300 PSI. BULLHEAD 50 BBL XANVIS PILL & 250 BBLS SOURCE H20 DOWN TBG @ 5 BPM W/650-2000 PSI. RU CAMCO W/LUBRICATOR. TEST LUBRICATOR TO 2500 PSI - OK. RIH W/SSSV LOCK-OUT TOOL. SET IN SSSV @ 560'. POH W/RUNNING TOOL. RIH & RETRIEVE LOCK-OUT TOOL RIH W/BRUSH & CHECK FLAPPER POSITION - OK. RIH & PULL PUMP OPEN PLUG @ 577'__ RIH & PULL DUMMY @ 10206'. RIH & SET DUMMY @ 623'. RD CAMCO. BLEED 430 PSI GAS FROM TBG. SHUT IN 1 HR & CHECK - STATIC. LD LUBRICATOR & MU LANDING JT. BOLDS. PULLING HANGER. RECEIVED MAR 1 4 1995 A!aska Oil & Gas Cons. Commission Anchora" WELL : MP L-13 OPERATION: RIG : NABORS 4ES PAGE: 2 02/22/95 (4) TD:ll016 PB:10868 02/23/95 (5) TD:ll016 PB:10868 02/24/95 (6) TD:ll016 PB:10868 02/25/95 (7) TD:ll016 PB:10868 POH W/2-7/8" COMPLETION MW: 0.0 CLOSE ANNULAR. UNSEAT PKR W/40K OVER (PU WT: 85K; SO WT: 42K). CSG'PRESS 210 PSI. BLEED OFF GAS. PUMPING DOWN TBG W/NO RETURNS. WORKING PIPE, FEELS LIKE RUBBERS DRAGGING. WORK TBG. UNABLE TO CIRC PAST PKR F/OTHER SIDE. CONTINUE WORKING TBG. STARTED MAKING CRUDE UP ANNULUS. MONITOR WELL. TBG & ANNULUS ON SLIGHT VACUUM. PULL HANGER TO FLOOR & LD. POH W/2-7/8" TBG. SLM & DRIFT. LD SSSV & PKR. D1 DRILL OS: 75 SEC. PU 1 JT. CIRC TO TIGER TANK TILL CLEAN RETURNS. CIRC TO PITS THRU CHOKE & GAS BUSTER. LOSS RATE 60 BPH. PUMP 40 BBL XANVIS PILL. SPOT ON BOTTOM. MONITOR WELL. LOSS RATE 36 BPH. SPOT 2ND 40 BBL PILL. MONITOR WELL. LOSS RATE 20-25 BPH. POH W/2-7/8" TBG. DRIFT & SLM. 51 STDS OUT. LOSS RATE 16 BPH. PREPARE TO RIH W/TBG TO HOT I MW: 0.0 LUB RIG. POH W/2-7/8" TBG & LD PUMP ASSY. WAIT ON SLICK LINE UNIT. (HAD TROUBLE GETTING STARTED AND GETTING TO LOCATION. THEN HAD TROUBLE WITH HYDRAULIC HOSED BURSTING DUE TO COLD TEMP. RIG UP CAMCO SLICK LINE UNIT & RIH #1 GR/JB TO 2348' SET DOWN CAME OUT EMPTY. RUN #2 RIH TO 4695' REC. FULL OF TAR OR PARAFIN. RIH RUN '#3 TO 5513' REC. 1-FORMED BAND PLUS FULL OF TAR OR PARAFIN. RIH RUN 94 TO 5745' REC, FULL OF PARAFIN OR TAR. PIECE OF FORMED BAND. LD SLICK LINE TOOLS & PREPARE TO RIH TO HOT OIL WELL. RU TO RUN ESP COMPLETION MW: 0.0 M/U 6" BIT & RIH ON TBG. TO 9861'. RIG HOT OIL & PUMP 150 BBL; 180 DEG. DIESEL TO CLEAR WELL BORE OF PARAFIN TO ALLOW FISHING FOR BANDS & FLAT GUARDS. TOH W/TBG. RIG CAMCO & RIH W/#16" GR/JB TO 10439 & REC 2 BANDS. RUN #2 5-1/2" MAGNET TO 10441' REC. 2-SMALL PIECES METAL. RUN #3 5-1/2" MAGNET TO 10443' REC. METAL SHAVINGS. RUN#4 2-1/4" MAGNET TO 10454' REC. METAL SHAVINGS. RUN #5 2-1/4" MAGNET TO 10454' REC. METAL SHAVINGS. RUN #6 6" GR/JB TO 10441' CAME OUT EMPTY. RIG UP TO RUN ESP COMPLETION. SECURE TREE & CLEAN AROUND CLR MW: 0.0 M/U ESP COMP. ASSY & TEST W/TECH. RIH WITH ESP COMP +216 JTS. 2-7/8" 6.5#/L80 8RD. EUE TBG. USED. 637 FORM ED BANDS +49 FLAT GUARDS +8 GUARDS. TBG. WT UP =83K DOWN 40K. MAKE SPLICE AT HANGER IN ESP CABLE & INSTALL PENETRATOR & TEST. LAND TBG HGR & RILDS & TEST HGR. TO 5000 PSI. PULL LANDING JT INSTALL BPV. NIPPLE DOWN BOP'S & NIPPLE UP TREE. TEST TREE & HGR TO 5000 PSI. PULL TWC RIG DOWN LUBRICATOR. FREEZE PROTECT WELL WITH 10 BBL. DIESEL. IN TBG & 70 BBL IN ANNULUS. SET BPV & SECURE TREE. RIG RELEASED AT 0600 HRS, 2/25/95. SIGNATURE: (drilling superintendent) DATE: RECEIVED MAR 1 4 1995 A~ska Oil & Gas Cons. Commission Anchom ' MP L-13 TREE: 2 9/16" - 5M WKM ..... -------.--~ .--- - - ~ I ORIG. KB. ELEV = 51' WELLHEAD: 11" 5M WKM ! I ORIG. GL. ELEV = 15' w/2 7/8" x 11" Tubing Hanger, 2 7/8" 8 rd. threads, 2.5 H" BPV profile .... 13 3/8" 54.5#/ft K-55 115' : ' ' i KOP @ 500' i Ma. Hole Angle , 54.5 Deg. AT 3811 MD N-80 Btm. 2 7/8" 6.5 #/ft. 8 rd. EUE TBG ~ I The minimum restriction is 2.441" , i I through tubing 2.441 ID, 2.347" DRIFT --- , CAPACITY: 0.00579 BBIJFT ' RECEIVED ; #2 ESP POWER CABLE -- MAR 1 4 1995 ; ~ Alaska 0il & Gas Cons. Commission CENTRIUFT ESP J J / (GC 1200 / 146) 10,000' MD j TANDEM SEALS . 10,009' M CENTRILIFT MOTOR '~t ~ ( 100 H.P.) ... 10,022' M i I 10,037' ME .~ , CENTRILIFT PHD '- PERFORATION SUMMARY .... ~ ~ 7" Baker Model "D" perm. Pk[. SIZE SPF INTERVAL OPEN/SQZ'D ~ W/20' of 20 Gage screen and~ 10,453' MI~ J i???~ taipipe. 4.5" 12 10,669 - 10719' OPEN , '-.",,",.", 4.5" 12 10,598 - 10,618 OPEN ~ 3-1/2" Camco "D" Npl. (2.75" I 10,490' MD 4.5" 12 10,554 - 10,564 OPEN ~ w/A-2 blanking plug on C Lock 4.5" 12 10,529 - 10,539 OPEN ~ I -' ' 3.5" WLEG 10,493' MD 4.5" 12 10,498- 10,518 OPEN _ _ _- _ _.7. = - = - DATE REV. BY COMMENTS MILNE POINT UNIT 02/25/95 JBF RWO WELL L13 APl NO' 50-029-22335 BP EXPLORATION (AK) AOGCC Individual Well Geological Materials Inventory PERMIT DATA T DATA_PLUS Page- 1 Date: 01/13/95 RUN DATE_RECVD 93-012 5760 93-012 93-012 93-012 93-012 6182 407 ~. COMP DATE:05-16-93 DAILY WELL OP. ~R 4-22-93 TO 5-09-93 SURVEY 93-012 BDEN 93-012 BDEN 93-012 DPR 93-012 DPR 93-012 NP/DP/DPR/GR 93-012 NP/DP/DPR/GR 93-012 NP/DP/GR 93-012 NP/DP/GR 5971-11017 3,3rr 09/02/1993 ~5971-11017 DPR/NP/DP/GR REVISE 3,3rr 07/20/1994 ~ 0.00-10870 E TELECO 6060-10954 MD 6060-10954 TVD ~L 6147-10954 MD ~ 6147-10954 TVD ,~L 6060-10954 TVD ~'L 6147-10954 MD ~L 6060-10954 TVD 07/19/1993 07/19/1993 07/19/1993 4-5 08/02/1993 4-5 08/02/1993 4-5 08/02/1993 4-5 08/02/1993 4-5 08/02/1993 4-5 08/02/1993 4-5 08/02/1993 4-5 08/02/1993 ~L 6060-10954 MD Are dry ditch samples required? Was the well cored? yes ~ Analysis & description rece~? Are well tests required?~/_yes "'~ Received? Well is in compliance Initial COMMENTS yes ~ And received? ~ no yes no 4710 Business Park Blvd., Ste. 14 Anchorage, AK 99503-7100 907-561-1951 Fax: 907-561-1358 State of Alaska Alaska Oil & Gas Conservation Comm. 3001 Porcupine Drive Anchorage, Alaska 99501 Attn: Larry Grant Well Reference Data: Well No: L-13 Field: Milne Point County: North Slope State: Alaska Date: July 19, 1994 API No: 50-029-22335 BHI Job #:450-1210 Enclosed is the following data as listed below: v~ - LIS Digital Data Tapes (LDWG Format) /1 - LIS Verification Listings .~ 1 - Depth Shift Verification Lo~ Upon Receipt, Please sign and fax to: Baker Hughes INTEQ Fax#: 561-1358 Attn: Raquel Rodriguez Received by: Date: RECEIVED Alaska Oil & Gas Cons. Anchorage 6324/6116 Nielson Way Anchorage, AK 99518 907-563-3269 Fax: 907-563-5865 907-562-2646 Fax: 907-561-1358 Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 Atto: Larry Grant Date: 30 August 1993 Well Reference Data: Well No: L- 13 Field: Milne Point County: North Slope State: Alaska Enclosed is the following data as listed below: AP1 No: 50-029-22335 BH-INTEQ No: 1210 1 - LIS Data Tape 1 - LIS Verification Listing Upon receipt, please sign and remm to Baker Hughes INTEQ 6116 Nielson Way Anchorage, AK 99518 Atto: Tom Brockway Date: 6324/6116 Nielson Way Anchorage, AK 99518 907-563-3269 Fax: 907-563-5865 907-562-2646 Fax: 907-561-1358 Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaksa 99501 Atto: Larry Grant Date: 28 July 1993 Well Reference Data: Well No: L- 13 Field: Milne Point County: North Slope State: Alaska API No: BH-INTEQ No: 50-029-22335 1210 Enclosed is the following data as listed below: Measured Depth Logs Log Type Bluelines Folded Sepias Rolled Sepias Mylar Film ,-'~PR I 1 0 0 RfMD/MNpEN 1 I 0 0 I 1 0~ 0 L/MNP 1 1 0' 0 ..I TOTALS: 4 4 0 0 Log Type Bluelines True Vertical Depth Logs Folded Sepias Rolled Sepias Mylar Film "'"DPR I I 0 0 ....-BDEN 1 1 0 0 ...--1VIDL/MNP 1 1 0 0 ~9'I~R/MDL/MNP I I 0 0 TOTALS: 4 4 0 Upon receipt, please sign and return to Received Baker Hughes INTEQ 6116 Nielson Way Anchorage, AK 99518 Attn: Tom Brockway Date: ~cor~co~ Conoco Inc. 3201 C Street, Suite 305 Anchorage, AK 99503-3999 (907) 564-7600 July 11, 1993 Mr. David W. Johnston Chairman Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 RE: L-13; WELL COMPLETION OR RECOMPLETION REPORT AND LOG Dear Mr. Johnston, Attached are two copies of Well Completion or Recompletion Report and Log, Form 10-407, and associated information for Milne Point Unit Well L-13. Please direct any questions regarding this matter to me at 564-7660. Sincerely, Tom Yeager SHEAR Specialist attachments CC; JLA, TJY L-13 Well File Chevron Occidental RECEIVED d u L 1 9 1995 Alaska 0il & Gas Cons. CommissiOn Anchorage STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1. Status of Well Classification of Service Well OIL~ GAS [] SUSPENDED [] ABANDONED [] SERVICE 2. Name of Operator Conoco Inc. m v~:mm~m:m · 3. Address 320 "c" 30s, 4. Location of well at surfade 1916'F~, 136'F~, Sec. 8, T13N, R10E, U.M. NS~ ~~1~~~"r"~~ETION-~ATE _ ' At Top Producing Interval 1521'F~, 4329'FEL, Sec. 6, T13N, R10E, U.M. N~ L-13 At Total Depth 11. Field and Pool 1250'F~ 4619'FEL, Sec. 6, T13N, R10E, U.M. NSB AK 5. Elevation in feet (indicate KB, DF, etc.) ~ 6. Lease Designation and Serial No. 51' MSL (30' AGL) ~ ~L. 25509 Kumaruk River ' ~ 15. Water Oept~, if offshore 16. No. of Completions 12. Date Spudded ~13. Date T,D. Reached 14. Date ComP., Susp. or Aband.~ N/A feet MSL ~ 1 4/22/93 I 5/03/93 ~/[6/93 '.,, whereSSSV set ~ 21. Thickness of Permafrost i7. Total Depth (MD+TVD) ~18.PlugBackDepth(M~D)~ 19. Directional Survey ~ 20. Depth feet MD [ + 1800' i 22. ~ype Electric or Other Logs Run Magnetic Multi-Shot Su~ey, G~a Ray, Resistivity, Neutron, Density (~ Logging) 7. Permit Number 93-12 8. APl Number 5°-029-22335 ~'~ 9. Unit or Lease Name Milne Point Unit 10. Well Number 23. CASING, LINER AND CEMENTING RECORD CASING SIZE WT. PER FT. GRADE __I&':_~_/B_"_",": ' '-' 54, ~ K- s s 9 5/8" 47 N-80 7" 26 L-80 SETTING DEPTH MD TOP I BOTTOM gurf~c~. 1 l 0 ;ur,ace I 6086 I ~urface 1 10996 1 24. Perforations open to Production (MD+TVD of Top and Bottom and HOLE SIZE 12 1/4" 8 1/2" . CEMENTING RECORD 30Os× Arctic I 1780mx Arc~c gm,III 325sx Class "G" AMOUNTPULLED :' · N/A 25. TUBING RECORD SIZE DEPTH SET (MD) PACKER SET (MD) interval, size and number) 10498-10518~ 10529-10539 10554-10564 10598-10618 10626-10656 10669-10719 7074-7086 7091-7097 7107-7113 7137-7150 7155-7175 7182-7214 2 7/8 '6~' 1 Il_ 36R 10453 & 560 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. DE.P_T,H_IN_TE_R_V_A_L_(MD) AMOUNT& KIND OF MATERIAL USED zu~J~-zu/l~ 150,000# iZ-i8 ].St' 27. PRODUCTION TEST Date First Production June 1, 1993 Date of Test Hours Tested 6/2/93 6 Flow Tubing Casing Pressure Press. 722 0 28. Method of Operation (Flowing, gas lift, etc.) ESP, Lift PRODUCTION FOR IOI L-BBL ] GAS-MCF TEST PERIOD --¢ I 275.7 46.2 CALCULATED , I OIL-BBL I GAS-MCF 24-HOUR RATE [~P'l 1103 185 CORE DATA IWATER-BBL IWATER-BBL 2 CHOKE SIZE IGAS'OILRATIO 18/64 I, 168 OIL GRAY ITY-APt (corr) 22 Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips. RECEIVED j u L 1 9 199 Alaska Oil & Gas Cons. com~'tss~O~ Anchorage Form 10-407 Submit in duplicate 29. 30. GEOLOGIC MARKUh5 NAME Kalubik ..... ~ Formation'." Kuparuk Formation 'T°'p Kuparuk Reservoir MEAS. DEPTH TRUE VERT. DEPTH 10200 10272 10495 6891 6933 7069 fORMATION TESTS Include interval tested, pressure data, all fluids recovered and gravity, GOR, and time of each phase. 31. LIST OF ATTACHMENTS Direction Survey, Activity Summary, Casing/Completion Sketch 32. I hereby certify that the foregoing is true and correct to the best of my knowledge INSTRUCTIONS General' This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. item 1' Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21' Indicate whether from ground level (GL) or other ~levation (DF, KB, etc.). Item 23: Attached supplemental records for this well should show the details of any multiple stage cement- ing and the location of the cementing tool. Item 27' Method of Operation' Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In- jection, Gas Injection, Shut-in, Other-exl)lain. Item 28' If no cores taken, indicate "none". Form 10-407 WELL No. L-13 C O MP LETIO N S KETCH MILNE POINT UNIT APl No.: 50-029-22335 PERMIT No.: 93-12 COMPLETED: 05-16-93 LAST WORKOVER: N/A ELECTRIC SUBMERSIBLE PUMP CABLE NO. 2 CL-350 NOTES: 1. ALL DEPTHS MEASURED KDB-SL = 51' KDB-GL = 29' 2. MAX. ANGLE = 54'@ 8520' 3. K.O.P. = 500' 4. SLANT HOLE: YES 5. TREE TYPE: WKM 2 9/16" APl 5000# W/ 2 7/8" 8rd TREETOP CONNECTION 6. MIN I.D. = OTIS 'X' NIPPLE (2.313" I.D.) @ 577' 7. COMPLETION FLUID: 10.2 PPG NaBr 8. STIMULATION: FRACTURE STIMULATION 73,000# 12-18 ISP BEHIND PIPE TIP SCREEN OUT MK, LZ, LK PERFORATIONS DENSITY: t2 SPF, 5" CSG GUNS 10,669'-10,719' MD (7178'-7213' TVD) 10,626'-10,656' MD (7152'-7172' TVD) 10,598'-10,618' MD (7135'-7148' TVB) 10,554'-10,564' MD (7107'-7114' TVD) 10,529'-10,559' MD (7091'-7098' TVD) 10,498'-10,518' MD (7072'-7085' TVD) Z-- -_- WKM HANGER WITH 2 1/2" BPV PROFILE 2 7/8" 6.5#/FT L-80 8rd EUE TBG. 10,868' PBTD .~ 10,996' MD 7" CSG SHOE 7" 26#/FT L-80 CSCJ (conoco) Eo oco ANCHORAGE DIVISION [ ~PPROV~:D BY: JHA/JLA D~TE: ' 6-50-93 DRAFTED BY: O. FAST CAD FILE: WCOL13 JUL 1 9 199~ Alaska Oil & 6as Cons. Commission Anchorage 560' 2 7/8" OTIS FMX SCSSV 560' ARROW HYDROW I IP DUAL PACKER 577' 2 7/8" OTIS 'X' NIPPLE (2.515" I.D.) 623' 2 7/8" CAMCO KBMO MANDREL W/ ORFICE 10,206' 2 7/8" CAMCO KBMG MANDREL W/ DUMMY 10,254' 2 7/8" POSITIVE CHECK VALVE 10,322 TOP OF ESP CENTRILIFT 6C 1200, 146 STAGE 1:5 TC AR, TANDEM SEALS, 100 HP MOTOR KRYTOX, PHD 10,568' BOTTOM OF ESP 10,453' BAKER MODEL 'D' PERM PKR W/ MILLOUT EXTENSION _._.-----10,463' 20' 20 GAUGE SCREEN ON 4" BASE ~ 10,483' 6' 3 1/2" PUP dOINT ~ 10,490' CAMCO 'D' NIPPLE WITH A-2 BLANKING PLUG ON C-LOCK ~ 10,493' WlRELINE RE-ENTRY GUIDE WELL No. L-13 CASING SKETCH (GIW) MILNE POINT UNIT APl No.: 50-029-22,335 PERMIT No.: 95-12 DRILLED: ARCTIC PACKED: OPEN OPERATOR: CONOCO INC. SURFACE LOCATION: 1916' FNL, 156' FWL, SEC 8, T13N, RIOE, UM BOTTOM HOLE LOCATION: 1250' FNL, 4619' FEL, SEC 6, T15N, RIOE, UM SPUD DATE: 4/22/93 ~ WKM CSG SPOOL RKB = 29' 15 3/8", 54.5#, K-55 BTRC SET @ 80' BGL HOS-ES STAGE CEMENT TOOL @ 1902' I'~O 9 5/8", 47#, N-80 BTRS, FS @ 6086' MD CEMENT DATA: 50 BBLS WATER, 1769 SX ARCTIC SET III WITH 5% GILSONITE + 300 SX CLASS 'G' + 1% D65 + 0.5% D156 + 1.5% S-1 (CaCl2) + 0.2% D46. CEMENTED TO SURFACE. TOC @ 10,580' RE( EIVED CENTRALIZERS: d U L 1 9 199il 1 PER 40' JTS 1-20 1 PER 80' JTS 22-54 Alaska Oil & Gas Cons. Commissio~ 1 PER 40' JTS 126-140 Anchorage 1 PER 40' JTS 98 AND 99 PBTD 10,898' MD TD 11,016' 7", 26#, L-80, BTRC SET @ 10,996'. CEMENT DATA: 100 BBLS, 11.0 SEPIOLITE, SPACER, ,.325 SX CLASS 'G' (67BBLS) CEMENT + 0.05 GPS D47 + 0.4% D65 + 0.1 GPS D135 + 0.5 GPS D600 + 0.15% D800 (LIQUID LATEX SYSTEM) NOT.E: LOST RETURNS WHILE RUNNING 7" CASING. NC) RETURNS WHILE CEMENTING. CENTRALIZERS: 1 PER 40' JTS 1-12 1 PER 80' JTS 28-48 1 PER 80' PSO JTS 184-241 1 PER 120' PSO JTS 242-255 {dOnOco~ CONOCO INC. ANCHORAGE DIVISION APPROVED BY: JHA/JLA DATE: 6-,30-93 DRAFTED BY: O. FAST CAD FILE: WCAL15 CONOCO Detailed Activity Report 04/22/1993 04/23/1993 04/24/1993 04/25/1993 04/26/1993 04/27/1993 04/28/1993 04/29/1993 PIB P2 P2 P2 P2 L2 L2 P2 T2 P2 P2 L2 P2 L2 P2 L2 T2 P2 P2 P2 P2 P2 P2 P2 P4 P4 P4 P4 P4 P4 P4 P4 P4 L4 P2 P2 P2 1J 2B 6C 6C 2B 3B 2B 42A 42A 23 42A 2B 2B 42A 3B 42A 7 42A 3B 2B 2B 5 6D 5 6F 23 13A 5 5 12A 12A 14A 14B 14A 14A 14A 14A 15A 42B 42B 42B 24 6C 6F 45 6.00 0.00 1.50 0.50 1.50 10.50 1.50 8.00 1.00 2.00 2.50 1.00 1.50 8.00 4.50 1.00 5.00 1.50 1.00 2.50 1.50 7.00 0.50 1.00 2.50 1.50 3.50 2.00 11.50 1.50 0.50 6.50 2.00 3.00 3.50 8.50 1.50 17.50 24.00 4.00 4.50 1.50 3.50 0.50 2.00 02:30 08:30 08:30 10:00 10:30 12:00 22:30 00:00 08:00 09:00 11:00 13:30 14:30 16:00 00:00 04:30 05:30 10:30 12:00 13:00 15:30 17:00 00:00 00:30 01:30 04:00 05:30 09:00 11:00 22:30 00:30 07:00 09:00 12:00 15:30 00:00 01:3O 19:00 20:00 04:00 08:30 10:00 13:30 14:00 08:30 08:30 10:00 10:30 12:00 22:30 00:00 08:00 09:00 11:00 13:30 14:30 16:00 00:00 04:30 05:30 10:30 12:00 13:00 15:30 17:00 00:00 00:30 01:30 04:00 05:30 09:00 11:00 22:30 00:00 OO:30 07:00 09:00 12:00 15:30 00:00 01:30 19:00 20:00 00:00 00:00 04:00 08:30 10:00 13:30 14:00 16:00 0.0 BHA HANDLING & TEST DIVERTER 0.0 BHA HANDLING & TEST DIVERTER 347.0 DRILL WITH H/WATE TO 347'. 347.0 POOH TO PICK UP BHA 347.0 BHA HANDLING ' 1514.0 DRILLING, W/MOTOR 1514.0 REAM OUT DOGLEG /~nchorage urnm 2309.0 DRILLING, W/MOTOR 2309.0 FAILURE, SUBSURFACE EQUIPMENT, MWD QUIT WORKING 2309.0 POOH TO CHANGE MWD 2309.0 CHANGE MWD, CHANGE BIT, TEST MWD 2309.0 PU 5" DRILL PIPE 2309.0 RIH TO 2009, HIT BRIDGE, REAM TO BOTTOM 4139.0 DRILL W/MOTOR TO EOB, ROTARY & MOTOR TO 4139' 5147.0 DRILLING, W/MOTOR 5147.0 NAVlDRILL FAILED, CIRCULATE POOH 5147.0 POOH TO 4400-B/REAM TO 1640-POOH 5147.0 CHANGE OUT NAVlDRILL 5147.0 SERVICE T/DRIVE 5147.0 MU BIT#2 - RIH TO 3914', HIT BRIDGE 5147.0 REAM AND WORK PIPE TO 5147' 6044.0 DRILL FROM 5147' TO 6044' 6095.0 DRILLING, W/MOTOR F/6044' TO 6095 6095.0 CIRCULATE & CONDITION 6095.0 SHORT TRIP 30 STANDS 6095.0 CIRCULATE & CONDITION 6095.0 POOH TO RUN 9-5/8" CASING 6095.0 BHA HANDLING - L/DOWN BHA 6095.0 RIG UP AND RUN 9-5/8" CASING 6095.0 RIG CMT HEAD & CIRCULATE 9-5/8" CSG. 0.0 CIRCULATE AN CONDITION 9-5/8" CSG. 6086.0 CMT. 9-5/8" CSG. BUMPED PLUG AT 0700 6086.0 L/DOWN LANDING JOINT & CMT EQUIPT. 6086.0 NU/ND DIVERTER 6086.0 RIG UP TOP DRIVE AND MAKE UP SPEED HEAD TORQUED UP TO 17000 FT/#S 6086.0 NU/ND BOP'S 6086.0 NU/ND BOP'S 6086.0 N/U DOPE -- MODIFY BELL NIPPLE, BOP PLATFORM, CHOKE LINE, AND CHANGE OUT RAM BONNETS. 6086.0 N/U FLOW NIPPLE & FLOWLINE. 6086.0 RUN TEST PLUG & TEST DOPE -- REWORK CHOKE VALVE ON MANIFOLD & BLIND RAMS. 6086.0 FAILURE, SURFACE EQUIPMENT -- UNABLE TO TEST BLIND RAMS. SEAL SURFACE ON BLIND RAM BODY WORN. CHANGE OUT DOUBLE GATE PREVENTER (SCHAFFER). UNABLE TO TEST DUE TO FLANGE LEAK -- N/D AND REPLACE APl RING GASKET. 6086.0 FAILURE, SURFACE EQUIPMENT -- CHANGE OUT APl RING GASKET BTWN DOUBLE GATE PREVENTER AND MUD CROSS. TEST BLIND RAM AND PIPE RAM TO 5000 PSIG/500 PSIG -~ GOOD TEST. 6086.0 FAILURE, SURFACE EQUIPMENT -- N/U ANNULAR PREVENTER, PITCHER NIPPLE, AND FLOWLINE. TESTED ANNULAR PREVENTER TO 3500 PSlG/500 PSIG -- GOOD TEST. 6086.0 PULL TEST PLUG, INSTALL WEAR RING, AND CLEAR RIG FLOOR. 6086.0 BHA HANDLING -- M/U AND TEST TURBINE, M/U BIT, ORIENT MWD, LOAD NEUTRON SOURCE WHILE HOLDING SAFETY MEETING W/ RIG CREWS. 6086.0 RIH TO ES CEMENTER (DV TOOL) @ 1900'MD. 6086.0 DRILL OUT ES CEMENTER W/PDC BIT 2-5K LBS -- TOOK LONGER THAN NORMAL DRILLING TIME OF UNDER 1 HOUR. CONOCO Detailed Activity Report ' ECEIv£ UU 04/30/1993 05/01/1993 05/02/1993 05/03/1993 05/04/1993 8 132 6F 3.50 16:00 19:30 6086.0 8 P2 15B 0.50 19:30 20:00 6086.0 8 P2 45 2.00 20:00 22:00 6086.0 8 P2 5 0.50 22:00 22:30 6086.0 8 P2 2A 0.25 22:30 22:45 6086.0 8 P2 2B 1.25 22:45 00:00 6086.0 8 P2 2B 2.00 00:00 02:00 6210.0 8 L2 42A 2.50 02:00 04:30 6210.0 8 1.2 42A 5.00 04:30 09:30 6210.0 8 L2 42A 2.00 09:30 11:30 6210.0 8 P2 7 1.00 11:30 12:30 6210.0 8 L2 42A 0.50 12:30 13:00 6210.0 8 P2 2B 11.00 13:00 00:00 6210.0 8 0.00 00:00 00:00 0.0 8 0.00 00:00 00:00 0.0 8 0.00 00:00 00:00 0.0 8 0.00 00:00 00:00 0.0 8 0.00 00:00 00:00 0.0 8 P2 2B 18.50 00:00 18:30 8805.0 8 P2 5 1.00 18:30 19:30 8805.0 8 P2 6D 1.00 19:30 20:30 8805.0 8 P2 9 1.00 20:30 21:30 8805.0 8 P2 7 1.00 21:30 22:30 8805.0 8 P2 6D 1.50 22:30 00:00 8805.0 8 P2 6F 1.00 00:00 01:00 8805.0 8 P2 2B 23.00 01:00 00:00 8805.0 8 P2 2B 16.50 00:00 16:30 11016.0 8 P2 5 2.00 16:30 18:30 11016.0 8 P2 10 0.50 18:30 19:00 11016.0 8 P2 6F 5.00 19:00 00:00 11016.0 8 P2 6F 2.50 00:00 02:30 11016.0 8 P2 6D 3.50 02:30 06:00 11016.0 8 P4 14A 2.00 06:00 08:00 11016.0 ... RIH TO FC @ 5999'MD WHILE P/U 79 JTS OF 5" G DRILL PIPE. TEST 9-5/8" CASING TO 1500 PSIG FOR 30 MINUTES -- FINAL PRESSURE 1380 PSIG. DRILL OUT FC, FS AND 10' NEW FORMATION TO 6105'MD. CBU PERFORM FIT = 13.5 PPG EMW. DRILLING, W/MOTOR TO 6114'MD. DRILLING RATE IS UNUSUALLY SLOW -- DISCUSSING W/ DIRECTIONAL DRILLER AND TURBINE SERVICE TECH. DRLG F/6114'-6210'-- PENETRATION RATE EXTREMELY SLOW FOR THIS HOLE SECTION. DECISION MADE TO PULL BHA & CK BIT & TURBINE. CBU, PUMP DRY JOB, & POOH TO BHA. RETRIEVE DATA FROM MWD AND REMOVE NEUTRON SOURCES. CHECKED PDC BIT-- MINOR CHIPPING ON CUTTERS IN SHOULDER AREA (DULL GRADE 1-2-BT-S-X-I-NO-TF). PUMPED THROUGH TURBINE ~- EXCESSIVE VIBRATION & NOISE. REPLACE TURBINE & SURFACE TEST. ORIENT MWD AND TOOL FACE. INSTALL NEUTRON SOURCE AND PERFORM SURFACE CHECK ON LWD TOOLS. RIH TO 4520' & FILL PIPE. SERVICE TOP DRIVE. FINISH RIH TO 6210'. NO HOLE PROBLEMS AND NO FILL. DRLG F/6210'-7286'. TEST 9-5/8" CASING TO 1500 PSIG FOR 30 MINUTES -- FINAL PRESSURE 1380 PSIG. DRILL OUT FC, FS AND 10' NEW FORMATION TO 6105'MD. CBU PERFORM FIT = 13.5 PPG EMW. DRILLING, W/MOTOR TO 6114'MD. DRILLING RATE IS UNUSUALLY SLOW -- DISCUSSING W/ DIRECTIONAL DRILLER AND TURBINE SERVICE TECH. DRILLING WITH TURBINE F/7287'-8805' MD. CIRCULATE AND CONDITION MUD/HOLE. POOH TO SHOE. HOLE FILL O.K. SLIP & CUT DRILL LINE. SERVICE TOP DRIVE. TIH WHILE P/U DRILL PIPE. TIH WHILE P/U DRILL PIPE. DRILLING W/TURBINE F/8805'-10,311' MD. VERY HARD DRLG F/10,260'-10,262' MD. DRILLING BREAK BELOW 10,262' MD - REDUCED ROP TO 60 FPH INSTANTANEOUS. BEGAN INCREASING MW F/9.8 TO 10.4 PPG AT +/-10,200' MD. TOOK SPR's AT +/-10,270' MD W/10.4 PPG MUD. DRLG F/10311 '-11016'. CIRCULATE & CONDITION DROP MULTISHOT SURVEY TOOL (EMS). POOH TO 7375' WHILE STANDING BACK DP IN DERRICK. NO EXCESSIVE DRAG OR PU -- HOLE IN GOOD CONDITION. CONTINUE TO POOH. POOH L/D DRILL PIPE. SLM - NO CORRECTION. L/D BHA. RETRIEVE EMS (MAGNETIC MULTI-SHOT). SAFETY MEETING PRIOR TO UNLOADING MWD SOURCES. UNLOAD RADIOACTIVE SOURCES. L/D MWD (DOWNLOAD DATA IN PIPE SHED). L/D TURBINE AND BIT. CHANGE RAMS FROM 5" TO 7" (TOP SET). CONOCO Detailed Activity Report 05/05/1993 05/07/1993 8 P4 13A 1.00 08:00 09:00 11016.0 8 P4 13A 2.00 09:00 11:00 11016.0 8 P4 13A 1.00 11:00 12:00 11016.0 8 P4 45 0,50 12:00 12:30 11016,0 8 P4 13A 1,50 12:30 14:00 11016,0 8 P4 13A 7.00 14:00 21:00 11016.0 8 P4 5 1,00 21:00 22:00 11016.0 8 P4 13A 2.00 22:00 00:00 11016.0 8 P4 13A 3.00 00:00 03:00 11016,0 8 P4 13A 1.00 03:00 04:00 11016.0 8 P4 5 1.50 04:00 05:30 11016.0 8 P4 12A 4.00 05:30 09:30 11016.0 8 P4 12A 0,50 09:30 10:00 11016.0 8 P4 13A 2,00 10:00 12:00 11016,0 8 P4 13A 1.00 12:00 13:00 11016,0 8 P4 15C 1.50 13:00 14:30 11016.0 10 L6 45 5,50 03:00 08:30 10906.0 10 L6 29C 2.50 08:30 11:00 10906,0 10 L6 45 3.00 11:00 14:00 10906.0 10 L6 45 0.50 14:00 14:30 10906.0 10 L6 6F 1.50 14:30 16:00 10906.0 10 L6 9 1.00 16:00 17:00 10906.0 10 L6 6F 3.50 17;00 20:30 10906.0 10 P6 15B 0.50 20:30 21:00 10906,0 10 L6 45 3.00 21:00 00:00 10906.0 JUL t 9 t J93 PULL WEAR BUSHING, P/U '"rAM" PACKER ASSEMBLY AND M/U PUPS, L/D IN PIPE SHED. R/U CASING EQUIPMENT. PREP PIPE SHED FOR RUNNING ORDER, P/U FS JOINT, FC JOINT AND JOINT #3. PRE-JOB SAFETY MEETING. P/U '"rAM" PACKER AND M/U ON TOP DRIVE, RUN 141 JOINTS OF T', 26#, L-80, BTrs CASING. CIRCULATE 3000 STROKES AT THE 9-5/8" CASING SHOE, RUN T' CASING (180 JOINTS TOTAL RUN AT 2400 HRS/OF 255). FINISH RUNNING 255 JTS, 7",26#,L80,BTRC CSG. R/D TAMM PKR & M/U CMT HEAD. ATTEMPT TO BREAK CIRC -- PACKING OFF, TEST CMT LINES TO 3000 PSIG. PUMP SPACER DROPPING BOTTOM PLUGS AHEAD & BEHIND. PUMP 67 BBLS OF BATCHED MIXED CEMENT CLASS G @ 15.8 PPG. DROP TOP PLUG, DISPLACE & BUMP W/397 BBLS 10.2 PPG BRINE & 31 BBLS OF LAKE WATER @ 3000 PSIG, HOLD 3000 PSIG FOR 3 MINUTES, RELEASE PRESSURE & CK FLOATS -- OK. R/D DOWELL. R/D CSG CREW, CUT LANDING JT (SPIDERS WOULD NOT RELEASE F/SPIDERS). FINISH R/D CSG CREW & EQUIPMENT. SET & TEST PACKOFF TO 5000 PSIG, R/U SCHLUMBERGER, SET DOWNCOMER JT IN ANNULAR PREVENTER AND TEST LUBRICATOR TO 1000 PSIG. RIH W/CBT/GR/CCL -- EST TOC @ 10382', POOH W/CBT/GR/CCL, WAITING, ORDERS RELOAD SQUEEZE GUNS FOR 4SPF FOR 2 FEET (9 SHOTS), ESTABLISH RADIO SILENCE ON L PAD, RIH AND CORRELATE TO CCL FROM CBT RUN -- SHOOT 9 SHOTS FROM 10378' TO 10380'. POOH AND VERIFY 9 SHOTS FIRED, R/D SCHLUMBERGER, CLOSE BLINDS, PUMP DOWN KILL LINE AND ESTABLISH INJECTION RATES: BROKEDOWN W/2450 PSIG 2250 PSIG @ 2 BPM 2150 PSIG @ 3 BPM 2325 PSIG @ 5 BPM 2450 PSIG @ 6 BPM, SHUT DOWN AND RECORD 5 MINUTE SIP @ 1750 PSIG, M/U EZSV W/3,5" DRILL PIPE WIPER DART CATCHER SUB. RIH TO 3000'. SLIP & CUT 105' OF DRILL LINE. FINISH RIH W/EZSV AND SET AT 10063'. PULL SHEARED STINGER OUT OF EZSV -- ROTATED 35 TURNS TO RIGHT TO EXTEND STINGER. STING BACK INTO EZSV, CLOSE PIPE RAMS, AND PRESSURE TEST THE T' CASING TO 3000 PSIG FOR 30 MINUTES -- PRESSURE BLED TO 2900 PSIG -- GOOD TEST. OPEN PIPE RAMS, CLOSE ANNULAR, AND UNSTING F/EZSV, PUMP 5 BBLS H20, AND PRESSURE TEST CEMENT LINES TO 5000 PSIG. MIX AND PUMP 22 BBLS OF CLASS G CEMENT W/0.05 GPS D047 + 0.4% BWOC D065 + 0.4% BWOC D156. STING INTO EZSV AND DISPLACE CEMENT TO 10123' (255' ABOVE PERFS & 60 FEET BELOW EZSV) W/68.3 BBLS. SHUT DOWN AND WAIT 15 MINUTES. CONOCO Detailed Activity Report ..... ~.:~ ........ M~U.,.......~....:.t.3.,: ............... ' .... : ........................... ' ..... "~ .................. ' ... 10 0.00 00:00 00:00 10906.0 HESITATION SQUEEZE 1: PUMP 1/4 BPM @ 2050 PSlG ISlP 1800 PSlG 5 MIN SI ~ 1740 PSlG 10 MIN SI @ 1700 PSlG 15 MIN SI @ 1660 PSlG. HESlSTATION SQUEEZE 2: PUMP 1/2 BPM @ 2020 PSlG ISlP 2170 PSlG 5 MIN ISlP @ 1990 10 0.00 00:00 00:00 10 MINUTE SI @ 1870 PSlG. 15 MINUTE SI @ 1870 PSlG. UNSTING F/F_ZSV AND REVERSE 2 DP VOLUMES. 10906.0 05/08/1993 10 L6 5 1.00 00:00 01:00 10905.0 10 L6 6F 3.00 01:00 04:00 10905.0 10 L6 6F 4.00 04:00 08:00 10905.0 10 P6 7 1.00 08:00 09:00 10905.0 10 L14 8B 1.50 09:00 10:30 10905.0 10 L6 2A 3.50 10:30 14:00 10905.0 10 L6 2A 2.00 14:00 16:00 10905.0 10 L6 6F 0.50 16:00 16:30 10905.0 10 L6 31C 2.50 16:30 19:00 10905.0 10 L6 6F 3.50 19:00 22:30 10905.0 10 L6 6F 1.50 22:30 00:00 10905.0 05/09/1993 10 L6 6F 2.50 00:00 02:30 10905.0 10 L6 5 6.00 02:30 08:30 10905.0 10 L6 15B 0.50 08:30 09:00 10905.0 10 L6 6F 3.50 09:00 12:30 10905.0 NOTE: RECEIVED VERBAL APPROVAL FROM COMMISSIONER DAVID JOHNSTONE OF AOGCC TO PERFORATE AT 10380' AND SQUEEZE 500 MD FEET OF CEMENT INTO 7"X 8.5" ANNULUS TO SATISFY 20 AAC 25.030.d.3.C. UNSTING F/EZSV & REV CIRC 2 DP VOLUMES. BLOWDOWN LINES. POOH W/EZSV STINGER, MU BIT & 10 4-3/4" DC, RIH TO 10000', SERVICE TOP DRIVE. CHANGE OUT TOP & Bo'FrOM JAW -- MODIFY BO3-1'OM JAW, TAG & DRILL ON EZSV @ 10063', DRLG CEMENT F/10244'-10646' W/10-20K, RIH F/10646'-10898' & TAG FC, CBU & FILTER 10.2 PPG BRINE. POOH & L/D DRILL COLLARS. P/U 7" 26# TANDEM CSG SCRAPERS & TIH OPEN ENDED. RIH TO 10869' W/7" SCRAPERS (30' OFF BOTTOM). R/U TO REVERSE, HOLD PREJOB SAFETY MEETING (DIRT MAGNET) AND REVERSE CIRC CASING WASH -- 25 BBL HEC, 50 BBLS DIRT MAGNET, AND 25 BBL HEC AT 8 BPM, NTU READING 120 AT END OF CASING WASH AND IMPROVED TO 8 DURING LAST CIRCULATION. TEST CASING AND CEMENT SQUEEZED PERFS TO 1750 PSIG FOR 15 MINUTES -- GOOD TEST. POOH & L/D 7" SCRAPERS. NOTE: TURNED CHARGES OVER TO COMPLETION PORTION OF AFE, JUL 1 9 1993 41asl(a Oil & Gas Cons. 6o~.nissto. Anchorage CONOCO, inc. Pad L stol #13 Milne Point Unit North Slope, Alaska SURVEY LiSTiNG Eastman Teleco Your ref : EMS <0-5993'> Our ref : svy3828 License : Date printed : 6-May-93 Date created : 28-Apr-93 Last revised : 6-May-93 Field is centred on 544582.018,6033467.392,999.00000,N Structure is centred on nTO 30 8.305,w149 38 7.22 Slot location is nTO 29 49.462,w149 38 3.217 Slot Grid coordinates are N 6031552.430, E 544729.496 Slot local coordinates are 1916.00 S 136.00 E Reference North is True North RECEIVED J U L 1 9 199;5 Alaska Oil & Gas Cons. Commissio~ Anchorage CONOCO, Inc. Pad L,13 Mitne Point Unit,North SLope, ALaska SURVEY LISTING Page 1 Your ref : EMS <0-5993'> Last revised : 6-May-93 Measured Inc[in. Azimuth True Vert. R E C T A N G U L A R DogLeg Vert Depth Degrees Degrees Depth C 0 0 R D I N A T E S Deg/lOOFt Sect 0.00 0.00 0.00 0.00 0.00 S 0.00 W 0.00 0.00 158.00 0.24 200.77 158.00 0.31 S 0.12 W 0.15 -0.17 250.00 0.07 170.23 250.00 0.55 S 0.18 ~ 0.20 -0.32 341.00 0.01 174.35 341.00 0.62 S 0.16 ~ 0.06 -0.38 430.00 0.44 319.43 430.00 0.37 S 0.38 ~ 0.51 -0.05 520.00 1.53 325.01 519.98 0.88 N 1.30 ~ 1.22 1.50 610.00 3.15 330.27 609.90 4.01 N 3.22 W 1.81 5.14 700.00 5.55 332.45 699.64 10.03 N 6.46 ~ 2.67 11.86 790.00 7.33 331.24 789.07 18.92 N 11.24 ~ 1.98 21.79 881.00 10.32 327.11 878.98 30.86 N 18.46 ~ 3.35 35.62 971.00 12.92 326.74 967.13 46.04 N 28.36 ~ 2.89 53.66 1061.00 15.43 329.62 1054.38 64.79 N 39.93 W 2.90 75.53 1156.00 17.80 329.14 1145.41 88.16 N 53.77~ 2.50 102.42 1251.00 20.27 326.66 1235.21 114.39 N 70.27 g 2.73 133.20 1346.00 24.22 324.81 1323.12 144.07 N 90.55 ~ 4.22 169.04 1441.00 30.04 323.59 1407.63 179.16 N 115.91 g 6.16 212.29 1536.00 28.14 323.41 1490.64 216.30 N 143.38 W 2.01 258.44 1632.00 30.42 324.20 1574.37 254.19 N 171.10 ~ 2.41 305.34 1724.00 33.44 324.91 1652.44 293.83 N 199.30 W 3.31 353.91 1819.00 37.06 325.95 1730.01 338.98 N 230.39 ~ 3.86 408.58 1912.00 40.62 327.71 1802.44 387.81 N 262.27 W 4.00 466.62 2007.00 41.63 326.96 1874.00 440.40 N 295.99 ~ 1.19 528.75 2101.00 44.77 325.62 1942.52 493.91 N 331.72 g 3.48 592.84 2195.00 48.13 324.53 2007.27 549.75 N 370.73 ~ 3.68 660.81 2291.00 50.53 324.53 2069.83 609.04 N 412.98 W 2.49 733.50 2387.00 53.35 326.14 2129.01 671.22 N 455.95 g 3.23 808.88 2480.00 52.86 326.53 2184.84 733.12 N 497.18 ~ 0.63 882.97 2574.00 53.28 326.17 2241.33 795.66 N 538.81 ~ 0.54 957.81 2669.00 53.18 325.60 2298.20 858.66 N 581.49 g 0.50 1033.66 2764.00 53.20 325.99 2355.12 921.57 N 624.25 ~ 0.33 1109.48 2859.00 52.74 325.98 2412.34 984.43 N 666.67 W 0.47 1185.06 2955.00 51.94 325.91 2470.98 1047.40 N 709.24 ~ 0.84 1260.81 3051.00 51.65 326.49 2530.36 1110.08 N 751.20 g 0.56 1335.97 3144.00 51.48 326.67 2588.16 1170.89 N 791.33 ~ 0.24 1408.51 3239.00 51.25 326.54 2647.47 1232.84 N 832.18 ~ 0.27 1482.40 3333.00 51.17 326.36 2706.36 1293.90 N 872.67 ~ 0.17 1555.37 3429.00 51.02 327.00 2766.66 1356.33 N 913.71 W 0.54 1629.74 3524.00 50.75 327.51 2826.59 1418.32 N 953.58 ~ 0.50 1703.04 3619.00 50.48 328.19 2886.87 1480.48 N 992.65 ~ 0.62 1775.98 3714.00 50.42 327.95 2947.36 1542.65 N 1031.40 ~ 0.21 1848.72 3809.00 54.23 324.88 3005.42 1605.24 N 1073.02 ~ 4.75 1923.59 3903.00 53.75 324.85 3060.69 1667.42 N 1116.78 ~ 0.50 1999.48 3999.00 53.02 324.84 3117.94 1730.42 N 1161.15 W 0.76 2076.38 4094.00 52.29 323.89 3175.56 1791.81 N 1205.15 g 1.10 2151.80 4188.00 53.11 323.05 3232.52 1851.90 N 1249.66 W 1.12 2226.52 4281.00 53.04 322.84 3288.40 1911.23 N 1294.45 ~ 0.19 2300.83 4377.00 52.97 322.95 3346.17 1972.38 N 1340.71 g 0.12 2377.47 4472.00 52.62 323.03 3403.62 2032.80 N 1386.25 ~ 0.38 2453.10 4567.00 52.08 322.53 3461.65 2092.69 N 1431.74 ~ 0.70 2528.29 4662.00 51.99 322.74 3520.09 2152.22 N 1477.19 ~ 0.19 2603.16 ALL data is in feet un[ess otherwise stated Coordinates from sLot #13 and TVD from weLLhead (51.00 Ft above mean sea [eve[). Vertical section is from weLLhead on azimuth 321.27 degrees. DecLination is 0.00 degrees, Convergence is 0.34 degrees. CaLculation uses the minimum curvature method. Presented by Eastman Te[eco CONOCO, Inc. Pad L,13 Nitne Point Unit,North SLope, ALaska SURVEY LISTING Page 2 Your ref : EMS <0-5993'> Last revised : 6-May-93 Measured ]ncLin. Azimuth True Vert. R E C T A N G U L A R DogLeg Vert Depth Degrees Degrees Depth C 0 0 R D I N A T E S Deg/lOOFt Sect 4755.00 51.92 322.31 3577.41 2210.34 N 1521.76 W 0.37 2676.38 4850.00 51.88 323.08 3636.02 2269.80 N 1567.07 W 0.64 2751.12 4946.00 51.69 323.33 3695.41 2330.21 N 1612.24 g 0.28 2826.51 5041.00 51.46 323.44 3754.45 2389.95 N 1656.63 ~ 0.26 2900.88 5138.00 51.62 323.75 3814.78 2451.08 N 1701.71 ~ 0.30 2976.78 5233.00 51.26 324.10 3873.99 2511.12 N 1745.45 ~ 0.48 3050.98 5328.00 50.96 324.04 3933.64 2571.00 N 1788.84 W 0.31 3124.83 5424.00 50.18 324.32 3994.61 2631.13 N 1832.24 ~ 0.84 3198.89 5519.00 49.76 324.16 4055.70 2690.16 N 1874.74 ~ 0.46 3271.54 5614.00 52.65 324.94 4115.22 2750.48 N 1917.67 ~ 3.10 3345.46 5710.00 52.15 324.90 4173.79 2812.73 N 1961.38 ~ 0.52 3421.36 5806.00 51.86 325.28 4232.89 2874.77 N 2004.67 W 0.44 3496.84 5900.00 51.16 324.29 4291.39 2934.88 N 2047.10 ~ 1.11 3570.28 5993.00 50.40 323.49 4350.20 2993.09 N 2089.55 ~ 1.05 3642.25 ALL data is in feet unless otherwise stated Coordinates from slot #13 and TVD from weLLhead (51.00 Ft above mean sea LeveL). Vertical section is from weLLhead on azimuth 321.27 degrees. DecLination is 0.00 degrees, Convergence is 0.34 degrees. CaLcuLation uses the minimumcurvature method. Presented by Eastman TeLeco CONOCO, [nc. SURVEY LISTING Page 1 Pad L,13 Your ref : EMS <6191-10870'> Mi[ne Point Unit,North Slope, Alaska Last revised : 6-Ma¥-93 Measured [nc[in. Azimuth True Vert. R E C T A N G U L A R Dogleg Vert Depth Degrees Degrees Depth C 0 0 R D [ N A T E S Deg/lOOFt Sect 6191.00 51.31 324.66 4475.20 3117.44 N 2179.63 W 0.65 3795.61 6286.00 51.90 325.15 4534.21 3178.36 N 2222.43 W 0.74 3869.92 6380.00 52.05 324.93 4592.11 3239.04 N 2264.86 W 0.26 3943.80 6473.00 52.13 324.87 4649.25 3299.08 N 2307.05 W 0.09 4017.03 6568.00 52.60 324.16 4707.27 3360.33 N 2350.72 g 0.77 4092.14 6663.00 52.25 323.89 4765.20 3421.26 N 2394.95 ~ 0.43 4167.34 6758.00 52.39 324.71 4823.27 3482.32 N 2438.82 g 0.70 4242.42 6853.00 52.69 321.71 4881.06 3542.69 N 2483.98 g 2.53 4317.77 6947.00 52.72 320.09 4938.02 3600.71 N 2531.14 ~ 1.37 4392.54 7042.00 52.67 321.33 4995.60 3659.19 N 2578.99 W 1.04 4468.10 7137.00 52.48 320.34 5053.34 3717.69 N 2626.63 ~ 0.85 4543.54 7232.00 52.47 320.34 5111.20 3775.69 N 2674.72 ~ 0.01 4618.87 7325.00 52.56 318.85 5167.80 3831.88 N 2722.55 W 1.27 4692.63 7420.00 52.51 319.24 5225.59 3888.83 N 2771.97 ~ 0.33 4767.98 7513.00 52.52 318.42 5282.18 3944.38 N 2820.55 g 0.70 4841.71 7607.00 52.56 318.51 5339.35 4000.24 N 2870.03 W 0.09 4916.23 7702.00 52.37 317.93 5397.23 4056.41 N 2920.22 g 0.53 4991.46 7797.00 52.26 317.23 5455.30 4111.91 N 2970.94 ~ 0.59 5066.49 7861.00 52.60 317.57 5494.33 4149.25 N 3005.27 ~ 0.68 5117.10 7956.00 52.82 317.58 5551.88 4205.04 N 3056.26 g 0.22 5192.52 8048.00 53.29 316.74 5607.18 4258.96 N 3106.26 ~ 0.89 5265.86 8143.00 53.51 317.77 5663.82 4314.97 N 3158.02 W 0.90 5341.94 8238.00 53.67 317.68 5720.21 4371.54 N 3209.45 ~ 0.19 5418.25 8332.00 53.80 317.67 5775.81 4427.58 N 3260.48 ~ 0.14 5493.89 8426.00 54.25 317.46 5831.03 4483.72 N 3311.81 W 0.50 5569.80 8520.00 54.44 317.94 5885.82 4540.21 N 3363.21 W 0.46 5646.03 8614.00 51.96 316.79 5942.13 4595.59 N 3414.17 ~ 2.81 5721.12 8710.00 52.19 316.71 6001.13 4650.75 N 3466.06 ~ 0.24 5796.61 8805.00 52.42 316.42 6059.22 4705.34 N 3517.74 ~ 0.34 5871.53 8900.00 52.53 316.43 6117.09 4759.92 N 3569.67 ~ 0.12 5946.60 8993.00 52.54 315.92 6173.66 4813.18 N 3620.78 W 0.44 6020.12 9087.00 52.71 315.79 6230.72 4866.78 N 3672.81 W 0.21 6094.49 9182.00 53.28 316.00 6287.90 4921.26 N 3725.61 ~ 0.62 6170.02 9277.00 53.51 316.10 6344.55 4976.16 N 3778.54 ~ 0.25 6245.97 9372.00 53.89 316.74 6400.79 5031.62 N 3831.32 ~ 0.67 6322.25 9466.00 53.93 316.90 6456.16 5087.01 N 3883.30 W 0.14 6397.98 9497.00 54.23 316.00 6474.35 5105.21 N 3900.59 g 2.53 6423.00 9592.00 54.39 316.1.1 6529.77 5160.77' N 3954.14 ~ 0.19 6499.84 9687.00 54.39 316.01 6585.08 5216.38 N 4007.74 W 0.08 6576.76 9782.00 53.60 316.24 6640.92 5271.78 N 4061.00 ~ 0.86 6653.30 9878.00 53.95 316.17 6697.66 5327.69 N 4114.59 W 0.37 6730.44 9974.00 54.12 315.85 6754.03 5383.59 N 4168.56 W 0.32 6807.82 10069.00 53.13 315.66 6810.37 5438.38 N 4221.93 ~ 1.05 6883.96 10165.00 53.03 316.03 6868.04 5493.45 N 4275.40 ~ 0.32 6960.36 10260.00 52.70 315.49 6925.39 5547.71 N 4328.23 g 0.57 7035.75 10355.00 52.16 310.48 6983.34 5599.03 N 4383.28 ~ 4.22 7110.22 10450.00 51.64 313.91 7041.96 5649.22 N 4438.66 ~ 2.89 7184.03 10546.00 51.10 314.12 7101.89 5701.33 N 4492.59 ~ 0.60 7258.42 10641.00 50.06 313.87 7162.21 5752.31 N 4545.39 ~ 1.11 7'531.22 10735.00 48.72 312.62 7223.40 5801.20 N 4597.36 ~ 1.75 7401.88 At[ data is in feet unless otherwise stated Coordinates from slot #13 and TVD from wellhead (51.00 Ft above mean sea level). Vertical section is from wellhead on azimuth 321.27 degrees. Declination is 0.00 degrees, Convergence is 0.34 degrees. Calculation uses the minimum curvature method. Presented by Eastman Teleco CONOCO, Inc. Pad L,13 Mi[ne Point Unit,North Slope, Ataska SURVEY LISTING Page 2 Your ref : EMS <6191-10870'> Last revised : 6-May-93 Measured [nc[in. Azimuth True Vert. R E C T A N 6 U L A R Dogleg Vert Depth Degrees Degrees Depth C 0 0 R D I N A T E S Deg/lOOFt Sect 10828.00 48.60 312.56 7284.82 5848.45 N 4648.77 W 0.14 7470.90 10870.00 48.61 312.65 7312.60 5869.78 N 4671.96 W 0.17 7502.05 All data is in feet un[ess otherwise stated Coordinates from slot #13 and TVD from wellhead (51.00 Ft above mean sea [eve[). Vertical section is from wellhead on azimuth 321.27 degrees. Declination is 0.00 degrees, Convergence is 0.34 degrees. Catcu[ation uses the minimum curvature method. Presented by Eastman Te[eco Conoco Inc. 3201 C Street, Suite 305 Anchorage, AK 99503-3999 (907) 564-7600 June 8, 1993 Mr. David Johnston Commissioner Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 RE: MPU L-13; APPLICATION FOR SUNDRY APPROVAL Dear Mr. Johnston, As discussed during our May 7, 1993 telephone conversation, Conoco, Inc. performed a remedial cement squeeze procedure in the MPU L-13 well in order to compensate for the less than required cement coverage achieved in the initial cement procedure. Attached are three copies of our Application for Sundry Approval, Form 10-403, for this procedure. Please direct any questions or concerns regarding this application to me at 564-7660. Sincerely, Tom Yeager SHEAR Specialist Attachment CC: JLA, TJY Chevron Occidental L-13 Well File RECEIVED d UN 1 4 lgg Alaska Oil & Gas Cons. Cornmissio~ Anchorage STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS 1. Type Abandon Suspend __ Operation shutdown Re-enter suspended well Alter casing X Repair well Plugging m Time extention Stimulate__ Change approved program Pull tubing_ Variance __ Perforate __ Other X 2. Name of Operator 5. Type of Well: 6. Datum elevation Conoco Inc. Development x 51' MSL 3. Address 3201 C Street, Suite 305 Anchorage, AK 99503 4. Location of well at surface 1916' FNL, 136' FWL, Sec. 8, T13N, RIOE, U.M. At top of productive interval 1521' FNL, 4329' FEL, Sec. 6, T13N, RIOE, U.M. At effective depth NSB AK NSB AK At total depth 1250' FNL, 4619' FEL, Sec. 6, T13N, RIOE, U.M. NSB AK Exploratory Stratigraphic 7. Unit or Property name Milne Point Unit 8. Well number L-13 9. Permit number 93-12 10. APl number 50-029-22335 11. Field/Pool KUPARUK RIVER 12. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical Casing Length Structural Conductor 80' Surface 6056' Intermediate Production 10966' Uner Perforation Depth: measured 11016 feet 7409 feet true vertical Tubing (size, grade, and measured depth) Packers and SSSV (type and measured depth) Plugs (measured) feet feet Junk (measured) PBTD @ 10,898' MD/7331' TVD NONE Size Cemented Measured depth True vertical depth 13-3/8" Surface 110' 110' 9-5/8" Surface 6086' 4409' 7" TOC @ 9880' MD 10,996` 7396' 10,378' - 10,380' MD 6997' - 6999' TVD 13. Attachments Description summaryof proposal X Detailed operations program X BOP sketch X 14. Estimated date for commencing operation 05/07/93 16. If proposal was verbally approved David Johnston Name of approver 05/07/93 Date approved 15. Status of well classification as: Oil X Gas~ Suspended Service 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. v//~ FOR COMMISSION USE ONLY Conditions of approval: Notify Commission so representative may witness Plug integrity BOP Test Mechanical Integrity Test Location clearance Su'~bsequent form required 10- Original Signed By Approved by order of the Commission Form 10-403 Rev 06/15/88 Drilling Engineer Date O~//C~/~~-~ Approval No ._ APproved Copy Returned _. Commissioner Date SUBMIT IN TRIPLICATE BRIEF DESCRIPTION OF ACTIVITY The Nabors 22E rig drilled the MPU L-13 well to T.D. at 11,016' MD. Production casing (7" 26 #/ft, L-80, BTRC) was set and cemented at 10,996' MD. Due to loss of circulation while running and cementing the production casing, a Cement Bond Log (CBL) was run to verify top ~f cement. The CBL indicated an estimated top of cement (ETOC) at 10~382' MD. The top hydrocarbon zone in the well is located at 10,494' MD/7069' TVD and labeled as the "Laminated Zone". In order to satisfy 20 AAC 25.030 d.4.B. (reference to 3.C.) a remedial cement squeeze procedure was developed and verbally approved by David Johnston on 05/07/93. Based on the CBL, the production casing was perforated from 10,378'-10,380' with 9 shots. An EZSV was set at 10,063' MD and the casing was tested to 3000 psig for 30 minutes above the EZSV packer. Injection rates were established and 22 bbls of class "G" with additives was squeezed through the perforations to place 500' of cement in the 7" casing by 8-1/2" open hole annulus using the hesitation squeeze method. The EZSV and cement was drilled out and the casing string and squeezed perforations were tested to 1750 psi to satisfy 20 AAC 030 g.1. L-13 REMEDIAL SQUEEZE CEMENT PROCEDURE S&FETY: Conduct pre-job safety meetings prior to each phase of the remedial squeeze operation to insure techniques are sound and equipment is in safe working order. This operation will expose personnel to explosives, high pressure, tripping drill pipe, and various operations/chemicals associated with cementing. · R/U Schlumberger to perforate a two (2) foot interval with 4 SPF from 10,378'-10380' MD. This 2' interval is located above any known cement from the CBL. Perforate and POOH. R/D Schlumberger. · M/U Halliburton "EZSV" cementer for 7", 26# casing and TIH to 10,080' MD (300' above perfs). Test 7" casing to 3000 psi for 30 minutes (either stung into the EZSV or unstung, at Drilling Foreman's discression). Sting into EZSV and establish injection rates at 1/2, 1, 2, 3, and 5 BPM into perfs. · Unsting from the EZSV. R/U Dowell and test lines to 5000 psi. Mix and pump the cement slurry described below. Maximum differential pressure while the cement is in the drill pipe is estimated at 800 psi. To keep the cement from running away, back pressure should be held on the annulus with a closed annular preventor. The pressure schedule should go from 0.0 to 800 psi (or greater for safety factor) over the volume of the cement (22 bbls). This pressure should be held until stung into the EZSV. Mix and pump the following cement Dowell slurry: Slurry: Class "G" + 0.4% D156 (FLA) + 0.4% D65 (Dispersant) + 0.05 GPS D47 (Antifoam) Volume: 22 bbls (±107 sx) Weight: 15.8 PPG Fluid Loss: 90-100 cc's Compressive: Test being conducted at present - contact D/S on slope for results NOTE: Thickening time at ±3 hours. They can mix the additives in the mix water tanks · Displace the cement with brine while holding back pressure until cement is 5 bbls from EZSV (±41 bbls into displacement). Reduce rate to 1-2 BPM and sting into the EZSV and begin squeezing fluid into the perfs. Bleed pressure off annulus and monitor annulus pressure during squeeze job. · Squeeze 12 bbls into perfs at sufficient rate then S/D and hold pressure on squeeze (after ±69.5 bbls displacement). · After 15 minutes squeeze 3 bbls into perfs at 1/4 to 1/2 BPM monitoring injection pressure and comparing to previously established injection rates and pressures· S/D for 15 minutes and monitor pressure· ~~EIVED Alaska Oil & Gas Cons. Comrnlssio[~ · · · 10. 11. NOTE: Squeeze 3 more bbls of cement into prefs at 1/4 to 1/2 BPM monitoring pressures as in 6 above. S/D and monitor pressure for 15 minutes. The TOC should now be 200' below the EZSV leaving 100' in the casing. Total displacement will be ±76 bbls. Attempt to bleed off pressure while flowing back in the Dowell unit. Allow a maximum of 3 bbls flow back while bleeding pressure off. If 3 bbls is bled back before complete bleed- off, inject the 3 bbls back into the perfs at minimum rate and hold pressure for ±4 hours. Bleed-off pressure, unsting from EZSV and reverse circulate 2 drill pipe volumes to clean out cement. POOH and L/D stinger. M/U 6-1/8" bit and DC's and TIH to EZSV at 10,080' MD. Drill EZSV and cement. CBU. Pressure test perfs to 1000 psi. If test, POOH. M/U 6-1/8" bit, tandem 7" casing scrapers and DC's and TIH to PBTD. Circulate and condition brine. POOH. Wait 8 hours before drilling EZSV. Wait at least 12 hours before drilling cement. Check integrity of cement by S/O weight (6-10,000# is usually good cement). Displacement volumes to be verified on location. CONOCO Detailed Activity Report 05/07/1993 10 L6 45 5.50 03:00 08:30 10906.0 05/08/1993 10 L6 29C 2.50 08:30 11:00 10906.0 10 L6 45 3.00 11:00 14:00 10906.0 10 L6 45 0.50 14:00 14:30 10906.0 10 L6 6F 1.50 14:30 16:00 10906.0 10 L6 9 1.00 16:00 17:00 10906.0 10 L6 6F 3.50 17:00 20:30 10906.0 10 P6 15B 0.50 20:30 21:00 10906.0 10 L6 45 3.00 21:00 00:00 10906.0 10 0.00 08:00 00:00 10906.0 10 0.00 00:00 00:00 10906.0 10 L6 5 1.00 00:00 01:00 10905.0 10 L6 6F 3.00 01:00 04:00 10905.0 10 L6 6F 4.00 04:00 08:00 10905.0 10 P6 7 1.00 08:00 09:00 10905.0 10 L14 8B 1.50 09:00 10:30 10905.0 10 L6 2A 3.50 10:30 14:00 10905.0 10 L6 2A 2.00 14:00 16:00 10905.0 10 L6 6F 0,50 16:00 16:30 10905.0 10 L6 31C 2.50 16:30 19:00 10905.0 10 L6 6F 3.50 19:00 22:30 10905.0 R/U SCHLUMBERGER, SET DOWNCOMER JT IN ANNULAR PREVENTER AND TEST LUBRICATOR TO 1000 PSlG. RIH W/CBT/GR/CCL -- EST TOC @ 10382'. POOH W/CBT/GR/CCL. WAITING, ORDERS RELOAD SQUEEZE GUNS FOR 4SPF FOR 2 FEET (9 SHOTS). ESTABLISH RADIO SILENCE ON L PAD. RIH AND CORRELATE TO CCL FROM CBT RUN -- SHOOT 9 SHOTS FROM 10378' TO 10380'. POOH AND VERIFY 9 SHOTS FIRED. R/D SCHLUMBERGER. CLOSE BLINDS, PUMP DOWN KILL LINE AND ESTABLISH INJECTION RATES: BROKEDOWN W/2450 PSIG 2250 PSlG @ 2 BPM 2150 PSlG @ 3 BPM 2325 PSIG @ 5 BPM 2450 PSIG @ 6 BPM, SHUT DOWN AND RECORD 5 MINUTE SiP @ 1750 PSIG. M/U EZSV W/3.5" DRILL PIPE WIPER DART CATCHER SUB. RIH TO 3000'. SUP & CUT 105' OF DRILL LINE. FINISH RIH W/EZSV AND SET AT 10063'. PULL SHEARED STINGER OUT OF EZSV -- ROTATED 35 TURNS TO RIGHT TO EXTEND STINGER. STING BACK INTO EZSV, CLOSE PIPE RAMS, AND PRESSURE TEST THE 7"' CASING TO 3000 PSIG FOR 30 MINUTES -- PRESSURE BLED TO 2900 PSIG -- GOOD TEST. OPEN PIPE RAMS, CLOSE ANNULAR, AND UNSTING F/EZSV, PUMP 5 BBLS H20, AND PRESSURE TEST CEMENT LINES TO 5000 PSIG. MIX AND PUMP 22 BBLS OF CLASS G CEMENT W/0.05 GPS D047 + 0.4% BWOC D065 + 0.4% BWOC D156. STING INTO EZSV AND DISPLACE CEMENT TO 10123' (255' ABOVE PERFS & 60 FEET BELOW EZSV) W/68.3 BBLS. SHUT DOWN AND WAIT 15 MINUTES. RECEIVEI PUMP 1/4 BPM @ 2050 PSIG ISIP 1800 PSIG 5 MIN SI @ 1740 PSIG 10MINSI@1700PSIG JUN 1 4 1993 15 MIN SI @ 1660 PSIG, HESISTATION SQUEEZE 2: Alaska Oil & Gas Cons. Comn' PUMP 1/2 BPM @ 2020 PSIG ISIP 2170 PSIG ~ncnorage 5 MIN ISIP @ 1990 10 MINUTE SI @ 1870 PSIG, 15 MINUTE SI @ 1870 PSIG, UNSTING F/EZSV AND REVERSE 2 DP VOLUMES. NOTE: RECEIVED VERBAL APPROVAL FROM COMMISSIONER DAVID JOHNSTONE OF AOGCC TO PERFORATE AT 10380' AND SQUEEZE 500 MD FEET OF CEMENT INTO 7"' X 8.5" ANNULUS TO SATISFY 20 AAC 25.030.d.3.C. UNSTING F! EZSV & REV ClRC 2 DP VOLUMES. BLOWDOWN LINES. POOH W/EZSV STINGER. MU BIT & 10 4-3/4" DC, RIH TO 10000'. SERVICE TOP DRIVE. CHANGE OUT TOP & BOTTOM JAW -- MODIFY BOTTOM JAW. TAG & DRILL ON EZSV @ 10063'. DRLG CEMENT F/10244'-10646' W/10-20K. RIH F/10646'-10898' & TAG FC. CBU & FILTER 10.2 PPG BRINE. POOH & I.JD DRILL COLLARS. CONOCO Detailed Activity Report 05/09/1993 10 L6 6F 1.50 22:30 00:O0 10905.0 10 L6 6F 2.50 00:00 02:30 10905.0 10 L6 5 6.00 02:30 08;3O 10905,0 10 L6 15B 0.50 08:30 09:00 10905.0 10 L6 6F 3.50 09:00 12:30 10905.0 P/U T' 26# TANDEM CSG SCRAPERS & TIH OPEN ENDED. RIH TO 10869' W/7" SCRAPERS (30' OFF BO'I-rOM). R/U TO REVERSE, HOLD PREJOB SAFETY MEETING (DIRT MAGNET) AND REVERSE CIRC CASING WASH -- 25 BBL HEC, 50 BBLS DIRT MAGNET, AND 25 BBL HEC AT 6 BPM. NTU READING 120 AT END OF CASING WASH AND IMPROVED TO 8 DURING LAST CIRCULATION. TEST CASING AND CEMENT SQUEEZED PERFS TO 1750 PSIG FOR 15 MINUTES -- GOOD TEST. POOH & L/D 7" SCRAPERS. NOTE: TURNED CHARGES OVER TO COMPLETION PORTION OF AFE. Oil & 6~;s ¢ "~,~' .......... o,,~,, Anchorage UUNUUU INL;,--NABOR% h<IO 22E 13-5/8" 581888 Flit Line APl 13-.5/8' ~ APl 1~--5/~* ~ APl 13-5/8' Flow Line Annubr Preventor. Ram Ram AFt 13-5/8' 2'1 x Il' ~M Tubing Spool w/ 2"-5000$t API ll' 5H Caslng Spool w/ 3"-5000~ Tt-recrJed Cornecft~n 9-5/8" CBOP . YS'I-L ., Ram Choke Ltne~ 3" 588E~ Manual Gate Val. ve & 3" HOR VALVE Ktl. t Ltne: Two 3" 58E~8~ Hanua~ Oale VaLves Side Outlets Side Outlets Sad:ace, Ca~tng 13-3/8" Conductor Ca~lng t,BOP STACK SIZE RATING MEETS AP;[ RP53 & SPEC 6A FOR CLASS 5H ~ 2,BOPE TO BE OPERATED EACH TR:fP AND TESTED WEEKL'i', $- 3,BOP HYDRAULIC CONTROL SYSTEM TO INCLUDE (5) STATION CONTROL = ~ r'~ HANIFOLD LOCATED REHOTE WITH t68 GALLON ACCUMULATOR, RESERVOIR ~ :~ UN]T, & AUXILIARY ENERO'f SOURCE FOR SYSTEH AC T] V AT ] O Iq, ~ ..., r~ ~r H]N]HUH ONE SET BLIND RAHS &. TWO SETS APPROPRIATE PIPE RAHS, ,,. ~ '~ 5, CHOKE & KILL MAN]FOLDS SHOWN SEPARATELY TO HEET AP] RP 53 o o, CLASS 5H REOU]REHENTS PRESSURE G~GE SENSOR ADJU STA Bl_~' CHOKE ~OJos'r~LE MAtdFOLD C~IOK£ .. VARI.~BLE CHOKE RC~.OTE CCN'I-ROL TO ATMOSPHERIC ~UD/GAS_ SEPARATOR GET-AWAY LINE TO RESERVE PIT CHG,K-Z ,S KILL t4At,'IFOLDS FOR ciS/8'" 8 7" OD C,A-,SIi'~G BOP ST,~CK BOP /,IANIFOLD LAYOUT - CONOCO, INC. · MEMORANDUM TO: David Johns~ Chairmarr"~,,~ STATE OFALASKA AL3~KA OIL AND GM CONSERVATION COMMISSION DA TE: April 27, 1993 FILE NO: DA-42793.DOC THRU: Blair Wondzell ~/~o P.I. Supervisor FROM: Doug Amos ~ Petroleum Inspector PHONE NO.' 279-1433 SUBJECT: BOPE Test Nabors 22E Conoco MPU L-13 PTD No~-93-12 Kuparuk Rv. Field Tuesday April 27, 1993: I traveled this date to Conoco's MPU L-13 well to witness the BOPE test on Nabors Rig No. 22E. The testing was delayed until 9:30 p.m. due to the modification made to the BOPE stack orientation in the cellar. These changes included rotating the stack 30° and the fabrication of a new choke line running from the stack to the choke manifold. Wednesday April 28, 1993.: As the attached AOGCC BOPE Test Report indicates~ there were two failures during this 9 hour test. The choke manifold valve failure was rebuilt, the blind rams and upper pipe rams were removed and replaced. I was unable to remain on location to witness the retest of the failed equipment, due to other work scheduled, as well as my departure from Prudhoe Bay, this date. I contacted the rig on 4/29/93 and was informed that the retests were conducted and witnessed by Conoco representatives Steve Bolt and Joe Poya. IN SUMMARY, I witnessed the BOPE test on ali equipment on Nabors Rig No. 22E at Conoco's MPU L-13 well. I was unable to remain on location to witness the retest of the 2 failures uncovered during this test. I did contact the rig and verified that the failures were corrected and that the retest had been witnessed by Conoco representatives Steve Bolt and Joe Poya. 7~.~~- ~'~- ~ ~,~ '2. Attachment DA-42793.XLS STATE OF ALASKA OIL AND GAS CONSERVATION COMMISSION BOPE Test Report OPERATION: Drlg: X Workover: Drlg Contractor: NABORS DRILLING Operator: CONOCO Well Name: MPU L-13 Casing Size: 9 5/8" Set @ Test: Initial X Weekly Rig No. 22E PTD # Rep.: Rig Rep.: 6,086 Location: Sec. Other 93-12 DATE: 4/27-28/93 Rig Ph.# 659-6452 JOE POYA & STEVE BOLT BRYAN BUSBY 8 T. 13N R. 10E Meridian Umiat MISC. INSPECTIONS: FLOOR SAFETY VALVES: Location Gen.: OK Well Sign YES Upper Kelly / IBOP Housekeeping: OK (Gen) Drl. Rig OK Lower Kelly Reserve Pit N/A Ball Type Inside BOP BOP STACK: Quan. Annular Preventer 1 Pipe Rams 5.5" 1 Pipe Rams 5.5" 1 Blind Rams 1 Choke Ln. Valves 2 HCR Valves 2 Kill Line Valves Check Valve Test Pressure P/F 500/5,000 P 500/5,000 500/5,000 500/5,000 500/5,000 500/5,000 2 500/5,000 P 0 0/0 N/A MUD SYSTEM: Visual Alarm Trip Tank OK OK Pit Level Indicators OK OK Flow Indicator OK OK Gas Detectors OK OK Test Quan. Pressure P/F 1 500/5,000 P 1 500/5,000 P I 500/5,000 P 1 500/5,000 P CHOKE MANIFOLD: No. Valves No. Flanges Manual Chokes Hydraulic Chokes 17 Test Pressure 500/5,000 39 500/5,000 P/F See Note P P P ACCUMULATOR SYSTEM: System Pressure Pressure After Closure 200 psi Attained After Closure 0 System Pressure Attained 2 Blind Switch Covers: Master: Nitgn. Btl's: 4 @ 2,800 3,000 I P 1,800 P minutes 21 sec. minutes 33 sec. YES Remote: YES Psig. Number of Failures 2 ~' TestTime 9 ' Hours Number of valves tested 27 Repair or Replacement of Failed Equipment will be made within I days. Notify the Inspector and follow with Written or Faxed verification to the AOGCC Commission Office at: Fax No. 276-7542 Inspector North Slope Pager No. 659-3607 or 3687 If your call is not returned by the inspector within 12 hours please contact the P. I. Supervisor at 279-1433 REMARKS: Note: the blind rams and one of the inside choke manifold valves failed. The valve was rebuilt and the Blind rams were replaced I was unable to witness the retest on the failed equipment. The retests were witnessed by Conoco Rep.s Steve Bolt and Joe Poya. Distribution: orig-Well File c - Oper./Rig c- Database c - Trip Rpt File c- Inspector STATE WITNESS REQUIRED? YES X NO 24 HOUR NOTICE GIVEN YES X NO Waived By: Witnessed By: Signed: Doug Amos FI-021L (Rev. 2/93) DA-42793.XLS ALASKA OIL AND GAS CONSERVATION COMMISSION February 18, 1993 Jeff Allison Drilling Enineer Conoco, Inc. 3201 C St., Ste 305 Anchorage, AK 99503 WALTER J. HICKEL, GOVERNOR 3001 PORCUPINE DRIVE ANCHORAGE, ALASKA 99501-3192 PHONE: (907) 279-1433 TELECOPY: (907) 276-7542 Re: Milne Point Unit L-13 Conoco, Inc. Permit No: 93-12 Sur. Loc. 1914'FNL, 134'FWL, Sec. 8, T13N, R10E, UM Btmhole Loc. 1307'FNL, 558'FWL, Sec. 6, T13N, R10E, UM Dear Mr. Allison: Enclosed is the approved application for permit to drill the above referenced well. The permit to drill does not exempt you from obtaining additional permits required by law from other governmental agencies, and does not authorize conducting drilling operations until all other required permitting determinations are made. Blowout prevention equipment (BOPE) must be tested in accordance with 20 AAC 25.035. Sufficient notice (approximately 24 hours) of the BOPE test performed before drilling below the surface casing shoe must be given so that a representative of the Commission may witness the test. Notice may be given by contacting the Commission petroleum field inspector on the North Slope pager at 659-3607. Chairm~ BY ORDER OF THE COMMISSION dlf/Enclosures cc: Department of Fish & Game, Habitat Section w/o encl. Department of Environmental Conservation w/o encl. ~ prinled on ~ecycled paper January 13, 1993 Conoco Inc, 3201 C Street, Suite 200 Anchorage, AK 99503-3999 (907) 564-7600 Mr. David W. Johnston Chairman Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99501 RE: PERMITS TO DRILL Dear Mr. Johnston, Attached are Permits to Drill, Form 10-401, and associated information for Milne Point Unit Wells L-11, L-12 and L-13. Also attached is check number 1037 in the amount of $300.00 to pay the fee identified in AAC 25.005. In addition to the attached, the following two informational items will be provided to the Commission as soon as they are available: 1. Certified plats of the surface locations of Wells L-12 and L-13 will be provided. These locations will be surveyed prior to mobilization of the drilling rig. 2. Schematic drawings of the recently redesigned pit system utilized on the Nabors 22E drilling rig will be provided. Nabors is currently in the process of producing these schematic drawings. Please direct any questions regarding this application to our Drilling Engineer, Mr. Jeff Allison, at 564-7662. Sincerely, Tom Yeager SHEAR Specialist attachments CC: JLA, CVL, TJY L-11 Well File L-12 Well File L-13 Well File Chevron Occidental RECEIVED JAN I 5 199;5 A_laska.Oii & Gas Cons, Commiss'ion )knchorage ALASKA¢ Re-Entry - Deepen la. Type of work Drill STATE OF ALASKA AND GAS CONSERVATION CL MISSION PERMIT TO DRILL 20 AAC 25.005 lb. Type of well. Exploratory ~ Stratigraphic Test ~ Development Oil Service _-- Developement Gas ;~ Single Zone L~ Multiple Zone 2. Name of Operator CONOCO I NC· 3. Address 3201 C Street, Suite 305s Anchorage, AK 99503 4. Location of well at surface - 191z~' FNLs 13z~ FNL~ Sec. 8, T13N, RIOE~ U.M., NSB, AK At top of productive interval 1600' FNL, 800' FWL, Section 6 At total depth 1307' FNL, 558' FWLs Section 6 12. Distance to nearest property line 558' ~. TD feet 13. Distance to nearest well 59' @ 500' TVD feet 16. To be completed for deviated wells Kickoff depth 500' feet 53 Maximum hole angle 5. Datum Elevation (DF or KB) 56' HSL (35' AGL) feet 6. Property Designation ADL 25509 7. Unit or property Name Milne Point Unit 8. Well number L-13 9. Approximate spud date April 25, 1993 14. Number of acres in property 2533 Acres 10. Field and Pool KUPARUK RIVER FIELD 11. Type Bond (see 20 AAC 25.025) B1 anket Number 8086-15-5q Amount $200,000 17. Anticipated pressure (see 20 AAC 25.035 (e)(2)) Maximum surface 29/~/i- psig At total depth CTVD) 15. Proposed depth (MD and TVD) 10~,946' MD/7329' TVD feet 3500 psi§ 18. Casing program size Specifications Hole Casing Weight I Grade J Coupling J Length 20" 13-~/8" 5~.s l K-55 I.ms 180, 19. To be completed for Redrill, Re-entry, and Deepen O Present well condition summary Total depth: measured true vertical Setting Depth Top MD ] TVD I 35' I 35' 35' I 35' 35' [ 35' Bottom MD ! TVD 115' 115' 6100' ] q-368' I 10s9z~6'! 7329' Quantity of cement (include stage data) 4-200 sx Permafrost C 4-1600 sx Permafrost E + 300 sx Class G + 300 sx Class G ~erations. Do~n Squeeze: feet Plugs (measured) feet 4.400 sx Permafrost C 4- 60 Bbls Diesel Effective depth: measured true vertical feet Junk (measured) feet Casing Length Structural Conductor Surface Intermediate Production Liner Perforation depth: measured true vertical Size Cemented Measured depth True Vertical depth 20. Attachments Filing fee [] Property plat [] BOP Sketch I~ Diverter Sketch ~ Drilling program ,~ Drilling fluid program [] Time vs depth plot ~ Refraction analysis [] Seabed report ~ 20 AAC 25.050 requirements 21. ! hereby certify that the foregoing is true and correct to the best of my knowledge Signed~'~___~..~...¢~ Title Drilling Engineer Date1/7/93 Commission Use Only Permit N{~mber ! APl number 1 Approval date,~, ,,~ ,-, I See cover letter ?~ "?.;'Z.- ! 50-- o¢ ?- -2. ~33 ~, _~ .. ! /,¢¢ _-- y~~' I for other requirements Conditions of approval Samples required ~ Yes ,,~ No Mud log required [] Yes ,~ No Hydrogen sulfide.measures ~ Yes ~ No Directional survey required ~f Yes rq, No Required working pressure for BOPE [q2M; ~,,3M; FI 5M; [] 10M; [] 15M Other: Original Signed By by order of Approved by David W. johRStOR Commissioner the commission Submit in-{ripli~ate Form 10-401Re~ 124-85 SUPPLEMENTAL DATA SHEET APPLICATION FOR PERMIT TO DRILL CONOCO MILNE POINT UNIT L-13 Conoco Inc. 3201 C Street, Suite 305 Anchorage, Ak 99503-3992 I. Casing and Cementing Program CASING PROGRAM Hole Size Casing Size Depth Weight Grade .~ Inches) (Inches) (ft) (DDf) Conn 20" 13-3/8" 115 ' 54.5 ppf K-55 WELD 12-1/4" 9-5/8" 6,100' 47 ppf N-80 BTTS 8-1/2" 7" 10,946' 26 ppf L-80 BTTS ae The 13-3/8" conductor will be set at 80' below ground level then cemented to the surface with ±200 sacks Permafrost type 'lCll , Be The 9-5/8" surface casing will be set approximately 100' below the base of the Schrader BlUff "OB" sand (±6100' MD) and cemented to surface. The cement job will be performed in two stages utilizing a hydraulically operated stage tool located at approximately 1,800' TVD. Stage I cement will consist of approximately 1000 sacks Permafrost type "E" cement followed by 250 sacks of class "G" tail. Stage II cement will consist of approximately 600 sacks of permafrost type "E" followed by a 50 sack class "G" tail. A top job utilizing Permfrost Type "C" cement will be performed if cement is not circulated to surface. Ce The 7" production casing will be set at 10,946' MD/7329' TVD or approximately 200' below the base of the Lower Kuparuk sands. Class "G" cement (approximately 300 sacks) will be circulated from the 7" shoe to 1000' above the top of the Kuparuk interval. After the 7" casing is set, the drilling rig will be utilized to complete the well. II. Drilling Fluid Program A. 0 - 500' 9.0 ppg freshwater spud mud. B. 500'- 6,194' 9.0 ppg - 9.5 ppg freshwater spud mud. Ce 6,100' - T D (10,946') 9.4 ppg - 10.5 ppg dispersed. Conoco Inc. Supplemental Data Sheet Well L-13 January 1993 Page 2 III. Drilling Program Conoco Inc. proposes to drill MPU well L-ii to continue development of the Kuparuk River Pool at Milne Point. The mud system will consist of a fresh water spud mud (9.0 - 9.5 ppg) from the surface to the 9-5/8" casing point at approximately 6,100' MD. A low solids, non-dispersed system (9.5 - 10.5 ppg) will be used from 6,100' to the 7" casing point at ±10,946' MD (T.D.). Magnetic single shot surveys will be taken at the 9-5/8" and 7" casing points to validate the MWD survey. MWD surveys will be taken every ±30' in the build interval and every 100' in the vertical and slant sections. The MWD survey will be used as the continuous survey. All surveys will be referenced to the Section Grid System and corrected for magnetic declination. Logging will consist of LWD measurements of Gamma Ray/Resistivity through the Shallow Oil Sands (±5100' - 6100' MD) and Gamma Ray/Resistivity/Density Porosity through the Kuparuk Interval (±10,400' - 10,800' MD). Additional electric logs may be run upon further investigation of each sand interval. A 20", 2,000 psig diverter will be installed on the 13-3/8" conductor for drilling surface hole. A 13-3/8", 5,000 psi RSRRA BOPE stack will be nippled up to the surface casing for drilling the production hole. Pressure tests and function tests will be performed on the pressure control equipment as per State Regulations. Maximum downhole pressure is estimated at 3,500 psi (initial reservoir pressure). Maximum surface pressure is estimated at approximately 2,944 psig, based on the Crawford Equation assuming an evacuated wellbore with a 0.7 SG gas, 0.9"Z" factor and a 610° R temperature. The closest wellbore is MPU well L-1 with 59' of closure at the 500' MD (KOP). Approximately 400 sacks of Permafrost Type C cement displaced with dead crude and/or diesel will be pumed down the 7" x 9-5/8" annulus for final arctic pack and freeze protection after disposing of excess drilling fluids. Conoco Inc. Supplemental Data Sheet Well L-13 January 1993 Page 3 WELL PROGNOSIS AND DRILLING PROGRAM TVD MD FORMATION BIT TYPE WT YP PV VISC FL 500 500 GRAVEL 994 1000 SAND/SHALE 3841 5238 MA TOP 4191 5811 OA TOP 4306 6000 OB BASE 4367 6100 9-5/8" CSG. 6986 10385 CAP ROCK 7036 10467 MK-1/LZ TOP 7176 10696 BASE LK-3 7206 10745 BASE KUP. 7328 10946 T.D. 517D 517D 517D 517D 517D 517D R417G R417G R417G R417G R417G SPUD 9.0 50 20 100 15 SPUD 9.0 50 20 80 15 SPUD 9.2 25 15 50 15 SPUD 9.2 20 15 50 12 SPUD 9.4 15 12 50 10 SPUD 9.6 12 10 40 8 LSND 10.4 12 12 35 6 LSND 10.6 12 10 35 6 LSND 10.6 12 10 35 6 LSND 10.6 12 10 35 6 LSND 10.6 10 15 35 6 True vertical depths are based on a sub-surface datum. The proposed depth is an estimate only. If the actual depth exceeds the permit depth by over 300' TVD a Sundry Notice will be submitted. o I/06/93 MPU WELL L-13 DAYS-vs- MEASURED DEPTH SURFACE LOCATION: 1914' FNL, 134' FWL, Sec. 8 (approximate) TARGET LOCATION (MK-1): 1600' FNL, 800' FWL, Sec. 6 TARGET LOCATION (B/LK-3): 1460' FNL, 685' FWL, Sec. 6 TARGET LOCATION (Base KUP.): 1430' FNL, 660' FWL, Sec. 6 TOTAL DEPTH: 1307' FNL, 558' FWL, Sec. 6 SURFACE 2000' '+' 4000' Cl 6000' 03 8ooo' IL! 10,000' 12,000' COI~IDUC'IIOR 98b' ,), MOI~ KOP 50~' TVI~ @ N~9.52W 3i0 deg.V100' ' ........... '1 : I i I EOB ~ 2241:1.' MD/2012'ITVD I .. ] : '. T ~ I TER~iNALIANGL~ 52.:3~3 deg.i I DI~ILL I -1/4" HOLE I I : i I I f .... 1 I I I I' I I I i ........................ ~ ............ ; ............ ! TD!@ 61~0' MD/4368~ I = = I RIG SE'Ii 9-5/8t" CASING I I I 'D RILL'8:'t 121""HO1~'"' : I I : i I : I 0 4 8 12 SET ~" CASING CUMMULATIVE DAYS 16 20 ; FCEIVED MPU WELL L-13 PROPOSED WELLPATH 2000 1000 1800 ~800 3000 4000 5000 6000 7000 8000 1000 2000 3000 4000 5000 6000 7000 8000 DISPLAOEMENT (?met) PLAN VIEW (FT) . .-', , . · ~ ;...i....x~.._~....! ~ ~ ~ ; . . : ~ ~ ; ..... ~.....L...J....~..... ~ '...4 .............. ~.....~....' .............. L....I...J .......... U...~... :....j .......................................................... ~ ............ : . ...' ...... ' .................. ~ ............................ .:.-~ ~ ~ - ~ ~ ~ ~ : ...~....~ i ~ ~ I ....... ~ ~ ~ , ~ ~ i ~ ............. q t,,.,,~,..,,I.,, ~ ~'~.,~,,,,,a ......... .......... t.,,,,I,..,,~,.,.,t ............ L.,,.i ..................................................................................... I , ~ I , i ....... l...,,t~ ................................................... i ................. ~ ........ ~ ........................................ L-4 ..... ~,,..l,,,..t,..J ...................... t.....t .......... n.,,,~,,**.n,.,,t,,,,, ~,,,,,1 .............. J,..,L,,,t,,,,,~ ....... k,,~,,,,+,,,,l .......... L,.J ............................. ~ ............... ~ .......................... ~ ............................................................ q .......... 1 ......... t,,***, ..................... ~ ...................................................... 4 .......... ~ n ~ ~ ' . . , . ~ ~ *' ' ' ' ' ~:~,~,,,,.~ .......... ~,,h~,,,,,~ ......................... ~ ........ J,,.L,,,k.,L...,~,,t .... ~ ............ ~ ....... i.,,..~ ......... ~ ............... I. , ~ ........... ~ ......... ..... L..,uJ ......... ~.~E...L..~ .... ~,...,,.. ~ ~.~.. ~ , , ~ ~ ~ ~ ~ ~ ~ t ~ ~ ~ ~ ~ : ~ i : ~ ~ ~~ ~ ~ ...... ~ ~',',',~ ..................... ' ................................... ~ i ............. i ; ' .... ?'"t*'"'t'""t ......... ~""*t'*'"~ .............. F"t'""t'""~' ......... ?'"'t'-"m't ......... ~ ............... ~ ......... ~'""~'""E""'E*~ .................................. t"*"t ..................................... ~ ......................... ~ ............... t ................... n .......................................................................................................... .... :,....i,,,,,~,,.,.~ ........ ~.,,,,u,,,,,.,..~ ......... L,.,.~ .......... ~ .......... ~ ....... ,,,,,,~ ...... : . ~,,,, ............. ~ ..... ~, ,,~*,*,,~,,*.~ ...... ~., i , ~ ~ .................... t ................... ~ ............. ~ ............... ~ ........................ ~ ......................... n"4 ""~""'~ ................... ~ ................................... ~ .......... ~*~ ............... ~ ............................ ~ .................... ~ ...................................... ~ .......... ~ ........................................ ~ ........................................ ..... ~ ~ ~ ~, .,.t.,,..~.,,,,~ ......... ',.,,,k,,,~,,,,,~, ........ ~ ~ ~ ~u"~'""~'""~ ......... ~ .......... ~ ~ ~"'*'~ .......... ~ ~'*"~n ............... ~'* I*'"'L""i~ ..... ' ....... ~ , , ~p4.,,,,~ ..........~,~ ,,',.. ~ ~,,*,,~ ......... i,,-~.,, t ...... t ..n,~ ~ ~ ~ ,,n~.., ~ ~ ,,,'~ ~ ...... ~. ,.,L...~...~ ~,,..,,,,..,~,., ,,~ ..... ":'~'""~'"'~':"~E~ '¥~'~"'~'"'~'5'¥~ .............. ~'"¥"~ ......... ~'""~ .................... r'? ........ ??'3? ........ ~ .......... ??'"m'n~"~"~"~'"'"~ ........ F"i .......... ~ .......... ? ................... ?"¥'~ ........................ ~ .......... ..... ~ i ~ i: ................ i ......... * , , i"*'": ................... ! i~i: ........... i,,,.,. .............. ,i!l'*'"' ............................................. ,~1 i l ........................ ~ :i ........................ i ~'""'"'*'1 ' ............... i .......... .'~ ....... i ~II*"''~ ..................................... , I i ' I I I ................................................. ~ ~ ........... ] ' ...................... !' ............... . ~ ..... : .4 ........ !...~ .... ~...~ .+ E ...... ~...~ = I i ~ I ~ . .: .~ ~ ..... T..... ~, [ ..... !. ~ ~ .I . , I ... ~ i . ~ . ~ ..... I. ..... r'"m""'~ .......... i'""m~'""i ....... i'"mi"'"i'"'l'""!'""i *"~'"'~ .......... ~ .......... ~"*"~ ......... i .......... i'*'"I ........ i'"'T'"*t'""! ......... ~'"'! "~ .......... ~ .......... ~'"~ ........ ~i .................. i'"'T'"'i'""I .......... F'"I"'"I*"'*I*'*"I'*"i'""i'""I' "'' ............... ! ................... r"T'"'~ ............. i' ~ !*'*' ..... ..... ~ ~ ~ 'P'"b"*'b'*"i .......... i.'...P.'.~.....'~.. ...... i*''''b'*'''''''~ . , ................... . . ~F'*" ............. . ~ , * "*'~ ............... ~ ~ ............ ~ . .l .............. t ................... , I~'""~ .......... ~ ....... ~ ~='""i ......... , ,i ................ ~ ~ .......... ~ ~:" *~ .... , I ,I .......... , ............ , ii ................ ~,.,.*~, ~ 1 ............ ~'""~ ........... ..... ~.....L..~.....~ .......... L..L...~.....~ ......... i .......... i,,...i,...,,...,~,.,..i,....~ ......................... ~.,.,.i .......... ~ ....................... !.....I ........................ I,.,..i..,..! .......... L,,,~ .......... i .............. ~....~i ........ ~ .......... ~ .............................. i .............. i .................... ~ ........................ i.....i,,..,~ .................. ~ .......... ~ ..... ..... '.....L...L...' ......... I .......... '.....~ ......... '.....~.....L...'.... ;.....i .......... i....~ .......... k...L..J .............. i.***.~-...I.....~ ........ '.....u..I....I ......... ~ .......... ! ............... L,..,**,..i .............. L..J,....i....~...J.-..I.....~.....~ .......... ~ ............... ~ ......... ~.....t .................... ~.....I.....~.....~ ......... i .......... ~ ............. ~ .......... I..**.~ ..... ..... i.....i .......... ~ .............. ~ ................... i.....~...J ......... '.,,..L...I.....~.....i .......... ~ ............... i ........................ ~ ............. ~ ........................ !.....i.....~ .................... ! .............. L..,i...,L4.} ~.,i ............... i ......... i.,,,,i,....i...,.i...,,~.,,,i .............................. ~ .......... ~ ......... ~ ....................... ~.....~ ............... ..... : . ~'""i"*"~ '": ....... .......... ~ .......... ~ .......... ~'""~'""~ .............. I · , ,~ .......... ~ ...... ~ I .... ~: ........ ' .... : i ..................................... ~ ~ = t ~ , ,~'"'*~ ......... ~ ........... ....... ~ ............. ~ ........... ' ............. = .......... I ...... ~, ...... t .t .................. ~ . ~ *,: ~ *"*~'***'~ .......... ..... ~'""P'"P'"I .......... P'"P'"~'""~ ........ P'*'~'""P"*~ ........ r*"'P*"P"i .............. ~ .......... I .......... F***r'*"~ .......... . '"'I*"*'P'*'~"*"! ............. ~'"*'P'"~ .......... m'P**'P'"~ .......... ~'"'i'""~ ............. I'*'**~ .""I ........................ ~ ......... ~ ............... i ......... i**'"P'"'~ .................. ~'""i"'*'~ ..... ..... u.~....~.....~ .......... u.~.....~....~ ...... u;.....~ .......... ~ .u,~.,..,~ .......... ~ ......... ~ ....... ~.....~ ...... ~ ...... L....~ ................ ~..~. ~.....~ ................ ~. ~ ..... L..]..~..I .... ~. t ...................................... ~ ......... ..... K"T'"'K'"I .......... F"T"*'F"'~ ......... K'"~.'"'?*'i ........ ff**F'T'"'~ ......... i .......... r'"~ .......... i'""K'*'K'**~ ......... F"~ .................. r'*'~'""i'*'"I .......... ff"~ .......... ~ .......... F*T'"'i ............. r'"F'~"-~ *'*'T"**F'Y*"'~ ................... ff"~ ......... I .......... ~ ................... F3"'"i ........ F'"i'*'"F"~ ..... ..... !..-.]..*..; .*..~ .......... F....b..*.! .............. !*..*.N*..~.....i ........ ~*..i.***.h.**.~ ....... i... ~ *,,J .......... !,,,**~,.. g ...... i,***.~ .................. ]...*~*..*,P.*..~ .......... i.*..:..* .:..*-i ......... ;.....i ..~... i .... ~***..L...*i ............. p..+*.*+*.-! ......... i ........... : .............. ~..*.*i..**.l .............. ;*.*.d .......... ~ ........ :.*..*~..*,.~.....~ ..... ..... L...L..~.....~ .......... L..L..L..~.' ' ~ ~.' ~....L...L. "~'"~L..~ ....~ ~''' ~' ~"'.'.~.'.]'..4... '~'...~ '~ ...... ".'.~ .L....~ .......... ~'...?/..2....~ ........ ~.J....'.~L'.~2 ....L...~'..'.?&~.'.] ']'.'.L.~L..L..~Ei'.'.]~'.'.]~L...LL ..'.]~'.2'.'.?~3'.L...'..L.'.L.'..L~'.'.'.].'.~L..L.].....~ ..... ..... m""'m'""~O~, ~ ~ ~ ~ S~o, ~ :'"'m ........ m'""m ........ ~ ......... m'"",'"":"".'""m'""m ............... m'""~ ........ m"'"?'"'~ ..... ..... ~*..*.~.* ..~*..*.~ ......... ~.....~..**.~....*: ........ ;*....~ ........... ~ ......... ~ .*~.....~..**.~ ......... ~ i *..~ ........ ~ ........ ~ ..... ~.* *.i .... ~ ........... [*.*.*~.*..*~ ........ ~....~....i,,,,*~ ......... ~.-*.~.....~ .............. ~...*.~ ........ ~.**+.*..~ ......... i . ~ i ............. ~ ~ .:... ~ ........ ~*.. .~. .. '.. *~ .... ~ ........... ~... ......... ......... .......... ........... ....... ........ ................ ,, ........... : .............. ............... .... '~ ............... i ......... ~'""~ .................... m'"T'"i .............. r'"r'"~ ........................ ~, ................................... r'*'r'"~ .............. P"r'"m ......... mm'""~ ......... ~ .......... ~ .............. ~ .......... ~ .................. i'""m~ .................... ~'""i ............. ~'""~ ............... m'""~ ................... ~'*'"~ ......... .... u...~.....L....~ ......... L...~.....~.....~ ........ ~.....u...u...~ ......... ~ .~.....~..**.! ........ ! . ~ ~ ....~ ......... i. L ~. ~ ..... ~....~....~ .~ ..... ~ .......... ~...**~ ........ L....u.. ~.....~ ......... ~....~.....~ ........... ~....~ ...~ ~. i ....~.....~..._~ . .~ ~ ~.....~ ...... ~ ~ t ~ ..... ~.....L..~ ..... ~.....~.....~ .... "'~ ............ ~ ........... ~ .......... ~ ........ ~ ............. ~ .............. ~ '" ~ .......... ~ .............. ~""'~ .................................. ~ ............... j ............. F'Y' "~ ....... ~ ..................... i ......................... : ........... :"'"'"'"' "'+'"+'"" ............................. i .................. r'"'~ ............ ~'""~ .............. s ............... ~ .... .... L...L...L..~ ......... L...L...L...~ ......... L...L.L...~ ......... L...L..-L...L...I .............. L....~ ......... ~ ......................... ~.....~.....~ ................... ~.....~,....~ ........ L...L...L.-~ ......... L...L,..~ ............. & ~ ~ ................... ~ .......... ~ ........ ~ ....................... L,..~ ........................ ~ .............. .... F'"F"~" ":: ......... F-':.'"" '""~ ......... :'" '~ '"'K'"~ ......... F'"::'"**mT'"'I '"'~'""~ .......... :: ......... F"T'"'~ .............. F'"r'"'~'""i ......... ~ .......... K'"~ ....... ~'"";' "T'"'~ ........ ;'""~'" '~'""~ .......... K"T""F'*'; ......... :'""K"T""~ ......... i'""F"T'"'~ ........ F*"~'""K'-:. ....... ~'""F" F"; ......... ?'"'F"~"'"~ .... .... ;'""~'"";"'"~ ......... ;'""~'"-'~'""~ ........ ~-":'"-~;"'-", ............... ~'""?'"'~ ........................... ~ ......... ~ ................. ~ .......... ~"-"~ ..................... ~'""~'""~m ........ ~'""~ ........... ~ ......... ;""~ ..................... ~-""; ........... ~'""1 '"~ ........... ~'""t ......... ~ ................. ~ ........................................ :, .......................... ~ ................ .... ~.....~.....L....~ ......... ~.....~.....~,,...~ ......... L....L....X....~ ......... L....~....,~..**.: ......... ~.....~ ...L....: ......... ~,....L....~ ... ~ ....... ~,.,J,....~ ............... ~,.,..~.,,..L....~ ........ ~.....L....L....: ......... L....U...L...~ .......... L....~.-..L...~.,...' _..L....L...i.--~ ......... L.._~.....L....~ ........ ~***..~.....k....: ........ ~...-~...,.~,.,..~ ......... ~.....~.....Z..,.~ ...... .... L..J.....L..~ ........ L..L....L.,J ......... L,.J...J...J .......... L...LJ.,.J ......... ~,....~.....i ,.J ........ L.J...J ............ L..L.J..J ......... L,,..~..,J.....~ ........ L..,LJ...J ........ LJ...J.....~ .......... LJ.,.J...J ......... L.J.....~..,J ........ L.J... ~...,,~ ........ L..J ....L.J ........ L..J.,J....L. L.J,..J..,.,J ..... .... ~.....L..L..~ ........ ~.....L...L..~ ......... L...L,,.L...; ......... L4,...,L...~ ......... L...~.,...L...t ........ ~.,...L...~.,.,.~ .......... ~.....L..L...~ .......... L..,~.....L...~ ........ L..L,..L..~ ........ L...L..,L..~ .......... L...i.,..,L..~ .............. L4.,.,.~ ........ ~,....~,....L...~ ......... L...L..,L.J ....... L.,.L...L,,~ .......... L..~..4.....~ ..... .... k...::.....~.....:: ........ ~.,...~ ...-~....,~ ......... :..,...~....~ .-..~ ..... ~.....~,....~.,..,I ......... ~...-,F...~.,.,.~ ........ ~.....L..~-. ~ ......... ~,....~.,...~.....i .......... L...~.... ;.....:. ........ ~.....~ ....~.,..; ........ ~.....L...~.....~ ....... k..+....L....~ ......... L....~--..L...~ ........ ~.....~ .......... ~ ......... b...L..~.....~ ........ L... L....~ ................... ~....~.....~ .... L...,L.J..,J ........ L..:..., ...J ....... ~... :....L...~ .... ~...~ .......... ~ ......... L...~ .......... i ........ L..I....~ .......... U..i .......... I .......... L...L...L...~ ....... L...L.J.... ~ ........ L...t,,...~ .............. L,..~...J.....~ ......... i.,...~.....L,,.~ ............. ~.....~...,.~ ......... ;....J,....;....; ........ L...L..~.....~ ........ L.,.L...~.....~ ..... 2000 TARGET O00RDZNATE$: MK/LZ: 1600' FNL~800' FWLL B/LK-3: 1460' FNL~ 68B' FWL B/KUPt ~4~0' FNL~ $6e' FWL TD= ~G$?' FNL~ ~58~ FWL (SECTION 6) EAST(+) / WEST(-) L-13 Proposed --- C[osest Approach Analysis --- /PROPOSED\ /NEARBY\ CLOSEST TVO DEPART TVO DEPART _ DIST NELL IDENT (FT) (FT) (FT) (FT) (FT) L-SSURA 444 0 450 4 315 L-8SURA -55 0 -55 0 405 L-9SURA -55 0 -55 0 409 L-1SURA 444 0 444 I 59 L-2SURA 0 0 0 0 182 L-3SURA 0 0 0 0 120 L-4SURA 1221 165 1322 240 262 SUM~tARY The yell ~hich comes closest to the proposed well is: L-1SURA Closest approach distance = 59 (FT) L-13 PROXIMITY PLOT ......................................................... !. ............................. ~ ......... ! ................................................................................................... ~ii ............................................................. i ................................................ !"~-~"i .......... i .......... ! .......... i''''''''~''''''''I ......... i ........... ! .......... ! ................... i .......... i .......... ! .......... i .................... i .......... i~ .......... i .......... i ......... i ........... i ........... i ......... i ............................................................................................................. ~-i' ................................................................................................. ~-~X ..................................................................... ' ....................................... i ........... ~'~ .......... ~'"'! .................... ~"i .......... i .......... i .................... ~ .......... i .......... i .......... i .......... ! .............................. ~ ............................. ......... i .......... + .......... ~ .......... i .................. ~: ........... ~ .......... i .......... i .................. i ......... i .......... i ......... ~ ................ + .......... ~ .......... i .......... ~ .................... i .......... i .......... ~ ........ ~ .................... ~ .......... i .......... ~ ........... i ................... ~ .......... i .......... ~ .......... i ................... Ii.ff~''''~ .......... i ............................. i ........... i .......... i ......... ' ......... i .......... i .......... ? ........ i! .............................. ~ .......... i ................... ......... i ........... ~ .......... i .......... i ..................... ~ .......... ~ .......... i .......... i .......... I ......... ? .......... i .......... I ....... ~ .................... ? .......... I .................... i .................... i .......... I .......... I .......... ~ ............................ ! .......... ~ ............................... ~ .............................. ~ ............................................................................ ~ ................................................ ~ ........................................ ~ ............................. ......... i .......... i .......... i .......... i .................... i ........... i .......... i .......... i .......... : ......... i .......... i..,.,.~: .......... i ........... i .......... ~ .......... ! ..................... i .......... i .......... i .......... i .......... ~,,~,.-i .......... ! ........... ~ .................... i .......... ~ .......... ~ .......... i .......... :::f:i ......... ~ .......... ~ .................... ~~;'~ .................. ~ .......... ~ ........... ~ .......... ~ .................... ~ ........... ~ .......... ~ .......... ~ ......... .......... i .......... i'""~,~'.~i .......... i .......... ~, .......... i .......... '""~? .......... ~'"'"'"~ .............. ~ .......... ~ .......... i .......... i ................... ~ .......... i ........... i .......... i .................... ! .......... i .......... i .......... ~ ......... i..,~,~!~ i .......... ......... ,,,,,,.,.~.,,~,,~_,~ .......... ~ ...... ........ i' ""~""i .......... ! .......... ......... i .,~.,4,-,.,~.i .......... i .......... ' .......... i .......... i'"'~'-'"~ ................. i .......... i .......... ~ .......... ~ .......... ............................................. i! .......... ........... ,~ ' ~ .......... i'"~ ~ ......... i ................... ........ :,.'"'"~ ........ !'""~ ............ i .......... ........ ': ......... .............. ~ ......... .......... ; ........ ~ ............... '""~': . ~ ~ ....... ~"~ ......... ~'"~ ....... ; ................. i ...... ? ......... ~ .......... , ................... ~ .......... i .......... ! ........ :, ............... T ......... ! ....... ! ........ ! ................. T .......... i .......... ! .......... ! .................. i ........ i ........ i ......... ! ......... i ....... ! .......... ! ........ ! ......... ~, ................... ! .......... ! .......... i ....... ! ............... '~ .......... ! ......... ! .......... ! .................. '~ .......... i .......... i ......... ! .................... ! ......... ! .......... ~ ......... ! ......... i .......... i .......... i .......... EAST(+) / WEST(-) ~1~--- i - - i i i ,~._~ i i / Ill t STATE PLANE COORDINATES ARE ZONE 4. 2, ALL GENETIC PO8~1~8 ~E BASED ON ~D, ~27. CxcFOET8 TO 8~CTION L~8 ARE COMPUTED BASED ON PROTRACTED VALUe8 OF THE 81~CTION CORNER POSTION& ,30' MILNt~ PT. VICINITY MAP LOCATION IN ,SEC. 8, T13N, R1OE, UMIAT MERIDIAN WELL -L-4 L-6 L-11 * L-12 * L-13 FROM NORTN LIt~ 2087' 2056' 2023 ' 2040' 191/~' * NOT SURVEYED jFROM ~W~ST L~ 1420' J 471 ' 1256 t J 134' STATE PLANE COORDINATES-ZONE 4 310' 160' 644,970.?' ,548,O2L$ 846,O71.9' GEODETIC POSITION8 NAD 1927 NORTH LATITUDE 70' 29'47.782' 70' 29'48.O96" 70' 29'48.410' WEST LONGITUDE -- 1~9' 37'66,147' 149' $7'154.661' 149' 37"63.1,56' QTYPICAL 6ECTION NO ,BCALE F. Robert DATE: Peb. 20, ?990 DRAWN: J~P PROPOSED WELL LOCATIONS SCALE 1'";2OO' JOB NO. B900O IIII , :'"49 T.~.H '.. · ~. ;?OBERT BELL ' · . NO. 3252-8 .- · · · · ,EPNA II , ~",, ,,.,.,.,,.,.,",,.,. a_ ........_ MILNE POINT UNIT ADL-i 5201 73 AC AMERADA ~~ ....... ' I 2-17-92 II ' ' ........ "" ' "" "~;"'-:";""Co.oco ''~! - % , ' II ADL-355022 ---------Il BI II ~ · ~ ~ ~ ~ ,~ ~ ~ ~ ~. ......... ,~:x~ ,'-xl ~--'~,~x conoco I x'~ I Ilu-=v_-u- (10)' cONOcO ( 3 ) ,~5ONOcOn~ 2 ~ Et au (la)11 x.., x_., /_-_--. ~-' T 13N,R 11E ~ ~ I / "~ - ~'~ ADL-47433 ! C°N°C° /~ I/'"' IADL-25509 ' ADL-47434 25e0'~'"'C.~,/ AE~T~43,2.,.,~ .~, ~ .... --'"~X. ~ 2533 AC. 2560 AC. / / '-'x../- / ~'-- -- I~ ~' ..... ~ ~ /':-% I-,, Il O ) ET AL \ / ICONOCOI ET AL II · ~ ~ I_~"~' "-" ~ ~ co.od,' ~ r;h\", [ ~1 (~!1 ~ i:':- ~'~i~ I[.;HP--VHUN '-" ET AL ~ \ I / ".:-../ II _ ,,.'c !.~_~ ~,,~.~. ADL- ADL- .... ~/ IIADL' ADL- ~ ~ ,~- (. ~ I ADL-25514 ADL-25515 3~ss4a 2ss~6 ADL-47437 ADL-47438 47439 315846 ~)i ~::, ~:::~ I II (~'CONOCO~ ("~CONOCO~I I ;;~" ~:{ '"'~' I I I ~ ADL-*5~)6 ~ ~' ~.--/ II I E ~; ~ I I I CHEVRON 2560AC. CHEVRON II I ~ '.'~.:~'"; -"' conoco ' ~-' ~ I ,I · ! ,~, I, ~ ,,I ,I DIYERTER STACK FOR 13 318" CONDUC'TOR R ; CF1VED , ,,,. r.-: ,J,:-. KI '~ ' 1 OPEN 9 DIVERTOR QUICK CO~ECT ASS~LY ~IFE V~VES t START INO I.U~ &D 1. The hydraulic control system will be in accordance with API specifications and AOGCC requirements. 2. The HCR valve will open when the preventer closes. A single 10" relief line will run off of the drilling spool HCR and go straight out the back of the sub base to reserve pit or open pad area (safe area). Down wind diversion will be accomplished with a tee with two knife valves on both sides of the tee and they will be linked together to enable one to always be open and the other to be closed. SONOCO CINC,-----NABORS R'[O 22B ].3 5/8'' 58 B8 5YSi S AFI 13-5/8' ~ APl 13--5/B* 5M APl 13~5~ 5M x 11' SM APl 11' 5M Tt~r~d~d Corr~cfbn Flow Line ~nubr Preventor. Ram Rom Ram Choke Ltne~ 3" 5080~ Manual Gate Valve & 3" HOE VALVE Kt.[[ Line: Two 3" 5080~ Manual Oa~6; Valves Tubing Spool w/ 2"-5000~t Side Outlets Cas.~ng Spool w/ 3"-5800~ Side Outlets 9-5/8" Supt~ace .Casing 13-3/8" Conductor Casing [,BOP' STACK SIZE RATING MEETS APl RP53 & SPEC 6A FOR CLASS 5M 2,BOPE TO BE OPERATED EACH TRIP AND TESTED WEEKLY, 3,BOP HYDRAUL]O CONTROL SYSTEM TO INCLUDE (5) STATION CONTROL ~ MAN}FOLD LOCATED REMOTE WITH [68 GALLON ACCUMULATOR, RESERVO}R '~ ~. UN]T, & AUX]LIAR~ ENERO~ SOURCE FOR SYSTEM ACT]VAT]ON, ~ ~.C r~ ~,MINIMUM ONE SET BLIND RAMS &. TWO SETS APPR, OPRIATE PIPE RAMS, ?. ?.' ..... ~ 5,CHOKE & KILL NAN]FOLDS SHOWN SEPARATELY TO HEET APl RP 53 ~;';; ......... CLASS 5H REQU]RENENTS, ~. L-':"; KILL ~"'"FOLD · PRESSURE PUMP ~'OTE: SEA ~'I~OL ~k~f~ PLUS ~. ~L ~A~l[~O $~Z[- RATING RF_'~OI'[' P£SSSUF,£ Cz,SE S[.h'SC~ "~ HYDRZULIC CONTROLL£D R£1401£ O?[RAT£D )~q/ ~DRAULIC CONTROLLED .~RE~IOTE OPERATED RE.~OT£ PRESSURE GAGE SENSOR ADJUSI'A 8L[ CHOKE ADJUSTABLE CHOKE CHOKE .UAt;IFOLD · .. -- YARI,~BL£ CHOKE CONTROL TO ATMOSPHERIC -I~(UD/G AS_. SEPARATOR GET-AWAY LINE TO RESERVE PIT CHOKE 8 KILL MA,IFOLDS FOR qs/a '~ " t' 8 7 OD CASIt~G BOP STACK ~OP HAIIIFOLD LAYOUT - CONOCO, INC. R [CEIV ,~,,~:.,=..! i b i~'~ · ~- ~-.~ Gas Cons, Comr¢,iss',-or' AI~,,s,,¢, Oil & MUD PITS - NABORS 22E The mud processing system totals 1200 barrels including one 80 barrel trip tank and one 20 barrel slug tank. All compartments have separate PVT probes. Nabors has changed the piping and added additional equipment to the circulation system of the 22E Rig. A schematic will be submitted as an attachment to the permit upon completion. E MFI..~f 0.®0 0.000 0:00O 0. C80 O~in n nnn 0:00U i .,TiFi O.~JO 0.000 O. OOO O,..__qgO ~DiV/O~ 7.000 10,946.0.00 5nn 3®,00 ~;~ nfl __ 345:D_3 0.00 0.00 0.00 0.00 0:00 0.00 0.00 0:00 345.00 2,720.60 ..,,.,..~--'--~. ~ ki eas,-_lre-'d E:'-'eF, it.,. , /./.e. State: Alaska Borough: Well: L-13 Reid: Kuparuk River st. Perm # 93-12 MPU-L-13.XLS Date 1f27t93 Engr: M. Minder Casing Interval Interval Size Bottom Top Length lA 9.625 4368 35 6085 2A 7 7329 35 10911 3A 0 0 0 0 4A 0 0 0 0 5A 0 0 0 0 6A 0 0 0 0 7A 0 0 0 0 8A 0 0 0 0 9A 0 0 0 0 10A 0 0 0 0 Description O~scription Description Tension Lbs Grade Thread Lbs 47 N-80 BTC 0 26 L-80 BTC 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 18 28 48 58 68 7B 88 98 108 Mud Hydraulic Collapse Wieght Gradient Gradient ppg psi./ft psi/fi 9,5 0.494 0.394 10.5 0.546 0.446 0.0 0.000 -0.1 O0 0.0 0.000 -0.100 0.0 0.000 --0,100 0.0 0,000 -0.100 0, 0 0.000 -0.100 0.0 0.000 -0.100 0.0 0.000 -0.100 0.0 0.000 -0.100 Maximum Minimum Pressure Yield psi psi BDF 2944 6870 2.3 2944 7240 2.5 0 0 #DIM/0! 0 0 #DIVI0! 0 0 #DIVIO! 0 0 #DIVI0! 0 0 #DIV/0! 0 0 #DIV/O! 0 0 #DlVl0! 0 0 #DIV/O! Tension Strength I~fLbs 1C 285.o55 2C 283.686 3C 0 443 0 5C 0 6C 0 7C 0 8C 0 9C 0 10C 0 K?Lbs TDF 1086 3.81 604 2.13 0 #DIV/0! o 0 #DIVi0! 0 #DIV/0! 0 #DIVi0.I 0 #Dr, Y/0! 0 0 #DIV/O! Collapse Collapse Pr-Bot-Psi 1721 3269 0 0 0 0 0 0 0 0 Resist. CDF 4750 2.76O 5410 1.655 0 #DIV,/0! o #DIV/O! 0 #DIVI0! 0 #DIV./O! 0 #DIVI0! 0 #DIVIO! 0 #DIVI0! 0 #DIV/0! ITEM (1) Fee (2) Loc ** CHECK LIST FOR NEW WELL PERMITS ** APPROVE DATE ' ff2--thru thru 13] [10 & 13] [14 thru 22] (5) BOPE ,/~..~f, ?-~Z- q~' [23 thru 25] Company Lease & Well YES NO 1. Is permit fee attached ............................................... 2. Is well to be located in a defined pool .............................. ~ .... 3. Is well located proper distance from property line ................... 4. Is well located proper distance from other wells ..................... 5. Is sufficient undedicated acreage available in this pool ............. 6. Is well to be deviated @ is wellbore plat included ................... 7. Is operator the only affected party .................................. 8. Can permit be approved before 15-day wait ............................ .... / REMARKS e 10. 11. 12. 13. 14. 15. 16. 17. 18. 19. 20. 21. 22. 23. 24. 25. 26. 27. 28. Does operator have a bond in force ................................... /~ Is a conservation order needed ....................................... L~ I S admi n i st rat i ve approval needed .................................... Is lease ncrnber appropriate .......................................... A~ '' Does well have a unique name & ncraber ................................ ~--, . Is conductor st r i ng provided ......................................... /ff4z. ~ Wil to Is Wil Wil Wil Is Is Is 1 surface casing protect all zones reasonably expected serve as an underground source of drinking water .................. enough cement used to circulate on conductor & surface ............ 1 cement tie in surface $ intermediate or production strings ...... 1 cement cover all known productive horizons ..................... 1 all casing give adequate safety in collapse, tension, and burst. well to be kicked off from an existing wellbore ................... old wellbore abandonment procedure included on 10-403 ............. adequate wellbore separation proposed ............................. Is a diverter s'ystem required ........................................ ~ Is drilling fluid program schematic & list of equipment adequate ..... Are necessary diagrams $ descriptions of diverter & BOPE attached .... ~, Does BOPE have sufficient pressure rating -- test to ~O~o psig ..... ~ Does choke manifold comply w/API RP-53 (May 84) ...................... ~ Is presence of H2S gas probable ...................................... ~ ,via thru 3~] (7) Contact ~'.~ [32] (8) Addl '~.~ geology' encl i neet i ha' DWJ_~ MTM.?'~F RAD~D ~..-'~ RPC_~J",~. BEW JD~ LG rev 12/92 jo/6.011 29. 30. 31. 32. 33. FOR EXPLORATORY & STRATIGRAPHIC WELLS: Are data presented on potential overpressure zones ................... Are seismic analysis data presented on shallow gas zones ............. If offshore loc, are survey results of seabed conditions presented... Name and phone number of contact to supply weekly progress data ...... Additional requirements ............................................. INITIAL GEOL UNIT ON/OFF POOL CLASS STATUS AREA ~ SHORE Additional remarks' / MERIDIAN' UMX SM TYPE,' Redril 1 , , Inj Rev Well History File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history, file. To improve the readability of the Well History file and to simplify finding information, information of this nature is accumulated at the end of the file under APPENDIX. No special effort has been made to chronologically organize this category of information. co.oco, ,.c. MILNE POINT UNIT ~) ~''~ AZT BDCM BDEM BDIM CADE CPDE DCCM DLAM DPEM DPLM DPSM DRHM GRAM GRCM INC NFBM NNBM NPEM NPLM NPSM NRCM PDCM PDDC PDEM RACM RADE ROPA ROPS RPCM RPDE TCDM TVD Note: BELOW ARE THE MNEMONICS THAT CAN BE FOUND ON THE LIS TAPE GENERATED FOR CONOCO, INC. WELL L-13 Azimuth - True (Posted) Bulk Density Compensated [RWD] Bulk Density Time Since Drilled [RWD] Bulk Density Data Density Integrated [RWD] Conductivity (AT) Corrected for Dielectric Effect [RWD] Conductivity (PD) Corrected for Dielectric Effect [RWD] Calculated Dielectric Constant Density Long Space Apparent [RWD] Photoelectric Cross Section [RWD] Density Porosity (LS) [RWD] Density Porosity (SS) [RWD] Delta RHO - Density [RWD] Gamma Ray Memory (APl) [RWD] Gamma Ray Borehole Corrected [RWD] Inclination - True (Posted) Neutron Far Base [Base] Neutron Near Base [Base] Neutron Porosity Time Since Drilled [RWD] Neutron Porosity (LS) Borehole Corr [RWD] Neutron Porosity (SS) Borehole Corr [RWD] Neutron Porosity Ratio Borehole Corr. [RWD] Phase Difference B?rehole Corrected [RWD] Phase Difference D~electric Corrected [RWD] Phase Difference Elapsed Time [RWD] Resistivity (AT) Borehole Corrected [RWD] Resistivity (AT) Corrected Dielectric Effect [RWD] Rate of Penetration Averaged Rate of Penetration Resistivity (PD) Borehole Corrected [RWD] Resistivity (PD) Corrected for Dielectric Effect [RWD] CDS Temperature [RWD] True Vertical Depth AT is Attenuation PD is Phase Difference LS is Limestone SS is Sandstone RWD is Recorded While Drilling deg g/cc mins pts mmho/m mmho/m g/cc B/e p.u. p.u. g/cc MWD-API cps deg cps cps mins. p.u. p.u. deg deg mins ohm-m ohm-m ft/hr ft/hr ohm-m ohm-m deg F ff Copyright 1987,1988,1989,1990,1991 By WESTERN ATLAS INTERNATIONAL, INC. All rights reserved. PROGRAM: TAPESCAN REVISION: 2.64 Start of execution: Fri 27 AUG 93 3:37p != = ECHOING INPUT PARAMETERS INPUT PARAMETER FILE: TAPESCAN.INP 1 2 3 4 5 6 7 12345678901234567890123456789012345678.9012345678901234567890123456789012 1 AUTOCURV = 0 , ! Automatic Curve renaming: O=OFF, I=ON 2 AUTOFILE = 0 , ! Automatic FILE= generation: O=OFF, I=ON 3 COMMENTS = 1 , ! Decode LIS Comment records: O=OFF, I=ON 4 INFORECS = 1 , ! Decode LIS Information records: O=NO, I=YES 5 LISTMETHOD = 0 , ! Listing Method: O=depth units 1=tape units 6 LISTFREQ = 50, ! Listing Frequency: Every n units 7 LISTMAX = 0 , ! Listing Maximum (O=no limit, value=list limit) 8 STATS = 0 , !Statistics generation: O=OFF, I=ON 9 FORCETYP = 0 , ! (I=BIT,2=LIS ... thru 35=Array Accoustic) (see table) 10 WRITEASCII = 0 , ! If 1, all ascii files will be written (fileOOOl.dat,etc.) 11 WRITETAP = I , ! Write Tape-Image File: O=NO, I=YES 12 SPLITLIS = 1 , ! If 1 and WRITETAP on, split LIS logical files to physical 13 SUBFILES = /0/, ! Tape Subtile write selection (WRITETAP must be on) 14 INTERPOLATE='YES' ! Set up for TAPE2WDS to interpolate datums ('YES'or'NO') 15 END != = USER INPUT PARAMETERS -! AUTOCURV = 0 , AUTOFILE = 0 , COMMENTS = 1 , INFORECS = 1 , LISTMETHOD = 0 , LISTFREQ = 50, LISTMAX = 0 , STATS = O, FORCETYP = 0 , WRITEASCll = 0 , WRITETAP = 1 , SPLITLIS = 1 , SUBFILES /0/, INTERPOLATE = 'YES' END ~ !-- PROCESSING INTERVAL FROM 0.000 TO 0.000 ............. CONSTANT PARAMETERS ...................................... AUTOCURV= O.O00000E+O0 AUTOFILE= O.O00000E+O0 COMMENTS= 1.00000 FORCETYP= O.O00000E+O0 INFORECS= 1.00000 LISTFREQ= 50.0000 LISTMAX = O.O00000E+O0 LISTMETH= O.O00000E+O0 SELFTEST= O.O00000E+O0 SPLITLIS= 1.00000 STATS = O.O00000E+O0 WRITEASC= O.O00000E+O0 WRITETAP= 1.00000 dpcoef = 1.00000 dpcte = 1.00000 ddength= O.O00000E+O0 listwave= O.O00000E+O0 maxrecln= O.O00000E+O0 minrecln= O.O00000E+O0 nsamples= O.O00000E+O0 numcurvs= O.O00000E+O0 numdatar= O.O00000E+O0 numrecfl= O.O00000E+O0 tfendep = O.O00000E+O0 tflevsp = O.O00000E+O0 tfstdep = O.O00000E+O0 wcrbot = O.O00000E+O0 wcrlevsp= O.O00000E +00 wcrtop = O.O00000E +00 I.. ARRAY PARAMETERS ............................................. SUBFILES(1) = O.O00000E+O0 SUBFILES(2) = -9999.00 SUBFILES(3) =-9999.00 SUBFILES(4) =-9999.00 SUBFILES(5) =-9999.00 SUBFILES(6) =-9999.00 SUBFILES(7) =-9999.00 SUBFILES(8) =-9999.00 SUBFILES(9) = -9999.00 SUBFILES(10) = -9999.00 SUBFILES(11) = -9999.00 SUBFILES(12) = -9999.00 SUBFILES(13) = -9999.00 SUBFILES(14) = -9999.00 SUBFILES(15) = -9999.00 SUBFILES(16) = -9999.00 SUBFILES(17) = -9999.00 SUBFILES(18) = -9999.00 SUBFILES(19) = -9999.00 SUBFILES(20) = -9999.00 SUBFILES(21) = -9999.00 SUBFILES(22) = -9999.00 SUBFILES(23) = -9999.00 SUBFILES(24) = -9999.00 SUBFILES(25) = -9999.00 SUBFILES(26) = -9999.00 SUBFILES(27) = -9999.00 SUBFILES(28) = -99cJ9.00 SUBFILES(29) = -9999.00 SUBFILES(30) = -9999.00 SUBFILES(31) = -9999.00 SUBFILES(32) = -9999.00 SUBFILES(33) = -9999.00 SUBFILES(34) = -9999.00 SUBFILES(35) = -9999.00 SUBFILES(36) = -9999.00 SUBFILES(37) = -9999.00 SUBFILES(38) = -9999.00 SUBFILES(39) = -9999.00 SUBFILES(40) = -9999.00 SUBFILES(41) = -9999.00 SUBFILES(42) = -9999.00 SUBFILES(43) = -9999.00 SUBFILES(44) = -9999.00 SUBFILES(45) = -9999.00 SUBFILES(46) = -9999.00 SUBFILES(47) = -9999.00 SUBFILES(46) = -9999.00 SUBFILES(49) = -9999.00 SUBFILES(50) = -9999.00 SUBFILES(51) = -9999.00 SUBFILES(52) = -9999.00 SUBFILES(53) = -9999.00 SUBFILES(54) = -9999.00 SUBFILES(55) = -9999.00 SUBFILES(56) = -9999.00 SUBFILES(57) = -9999.00 SUBFILES(58) = -9999.00 SUBFILES(59) = -9999.00 SUBFILES(60) = -9999.00 SUBFILES(61) = -9999.00 SUBFILES(62) = -9999.00 SUBFILES(63) = -9999.00 SUBFILES(64) = -9999.00 SUBFILES(65) = -9999.00 SUBFILES(66) = -9999.00 SUBFILES(67) = -9999.00 SUBFILES(68) = -9999.00 SUBFILES(69) = -9999.00 SUBFILES(70) = -9999.00 SUBFILE$(71) = -9999.00 SUBFILES(72) = -9999.00 $UBFILES(73) = -9999.00 SUBFILES(74) = -9999.00 SUBFILES(75) = -9999.00 SUBFILES(76) = -9999.00 SUBFILES(77) = -9999.00 SUBFILES(78) = -9999.00 SUBFILES(79) = -9999.00 SUBFILES(80) = -9999.00 SUBFILES(81) = -9999.00 SUBFILES(82) = -9999.00 SUBFILES(83) = -9999.00 SUBFILES(84) = -9999.00 SUBFILES(85) = -9999.00 SUBFILES(86) = -9999.00 SUBFILES(87) = -9999.00 SUBFILES(88) = -9999.00 SUBFILES(89) = -9999.00 SUBFILES(90) = -9999.00 SUBFILES(91) = -9999.00 SUBFILES(92) = -9999.00 SUBFILES(93) = -9999.00 SUBFILES(95) = -9999.00 SUBFILES(97) = -9999.00 SUBFILES(99) = -9999.00 SUBFILES(101) = -9999.00 SUBFILES(103) = -9999.00 SUBFILES(105) = -9999.00 SUBFILES(107) = -9999.00 SUBFILES(109) = -9999.00 SUBFILES(111) = -9999.00 SUBFILES(113) = -9999.00 SUBFILES(115) = -9999.00 SUBFILES(117) = -9999.00 SUBFILES(119) = -9999.00 ~ SUBFILES(121) = -9999.00 SUBFILES(123) = -9999.00 SUBFILES(125) -- -9999.00 ,-~ SUBFILES(127) = -9999.00 SUBFILES(94) = -9999.00 SUBFILES(96) = -9999.00 SUBFILES(98) = -9999.00 SUBFILES(IO0) = -9999.00 SUBFILES(102) = -9999.00 SUBFI LES (104) = -9999.00 SUBFILES(106) = -9999.00 SUBFILES(108) = -9999.00 SUBFILES(110) = -9999.00 SUBFILES(112) = -9999.00 SUBFILES(114) = -9999.00 SUBFILES(116) = -9999.00 SUBFILES(118) = -9999.00 SUBFILES(120) = -9999.00 SUBFILES(122) = -9999.00 SUBFILES(124) = -9999.00 SUBFILES(126) = -9999.00 SUBFILES(128) = -9999.00 !-- STRING PARAMETERS ....................................... INTERPOL= YES Input Tape Device, LU (1) is: TAPEC: Output Tape-Image file, LU (2) is: J:\1210\1210.TAP (Output Tape-Image file will be created) Listing Method (.'LISTMETH") = O, Depth Unit oriented listing. Listing Frequency ("MSTFREQ") is every ( 50) units of Depth. Listing output limiting (LISTMAX) not enabled... (to enable list limiting set LISTMAX positive) Data Statistics reporting ("STATS") has not been enabled. (Specify STATS = 1 to enable this feature) Automatic curve renaming has been disabled by user input (AUTOCURV=O). Automatic "FILE= n" card generation is disabled. (This is the program default, AUTOFILE=O) (Specify AUTOFILE= 1 to enable this feature) LIS comment record decoding (COMMENTS=l) has been enabled by user input. LIS information record decoding (INFORECS= 1) has been enabled by user input. The WRITEASC option has not been enabled... (to write ASCII subfiles specify WRITEASC= 1) Tape Subfile 1 is type: LIS **** REEL HEADER **** MWD 93/8/27 1210 01 **** TAPE HEADER **** MWD 93/8/27 1210 01 Tape Subtile: 1 Minimum record length: Maximum record length: 2 records,.. 132 bytes 132 bytes Tape Subtile 2 is type: LIS LIS COMMENT RECORD(s): 12345678901234567890123456789012345678901234567890123456789012345678901234567890 TAPE HEADER PRUDHOE BAY UNIT MWD/MAD LOGS WELL NAME: L-13 APl NUMBER: 50-029-22335 OPERATOR: Conoco Inc. LOGGING COMPANY: BAKER HUGHES INTEQ ~ TAPE CREATION DATE: 30 AUG 93 JOB DATA .... BIT RUN1 BIT RUN2 BIT RUN3 JOB NUMBER: 1210 1210 LOGGING ENGINEER: J. BURTON S.BURKHARDT OPERATOR WITNESS: D. MOUNTJOY J. POLYA SURFACE LOCATION SECTION: 8 ~ TOWNSHIP: 13N RANGE: 10E FNL: 1916 FSL: FEL: FWL: 136 ELEVATION(FT FROM MSL 0) ;-~ KELLY BUSHING: 51.00 DERRICK FLOOR: 50.00 GROUND LEVEL: 17.70 WELL CASING RECORD OPEN HOLE CASING DRILLERS BIT SIZE (IN) SIZE (IN) DEPTH (FT) 1ST STRING 24.000 13.375 110.0 2ND STRING 12.250 9.625 6086.0 3RD STRING 8.500 PRODUCTION STRING REMARKS: $ **** FILE HEADER **** MWD .001 1024 LIS COMMENT RECORD(s): 123456789~123456789~123456789~123456789~123456789~123456789~123456789~123456789~ FILE HEADER FILE NUMBER: 1 EDITED MERGED MWD Depth shifted and clipped curves; all bit runs merged. DEPTH INCREMENT: 0.5000 FILE SUMMARY PBU TOOL CODE START DEPTH STOP DEPTH MWD 5971.0 11017.0 $ BASELINE CURVE FOR SHIFTS: CURVE SHIFT DATA (MEASURED DEPTH) ...... EQUIVALENT UNSHIFTED DEPTH ......... BASELINE DEPTH $ MERGED DATA SOURCE PBU TOOL CODE BIT RUN NO MERGE TOP MWD 3 5971.0 6147.0 MWD 3 6147.0 11017.0 $ # REMARKS: $ CN WN FN COUN STAT MERGE BASE NO DEPTH SHIFTING PERFORMED ON THIS TAPE. : Conoco Inc. : L-13 : Milne Point Unit : North Slope :Alaska LIS COMMENT RECORD(s): 12345678,901234567890123456789012345678,901234567890123456789012345678901234567890 THIS FILE CONTAINS EDITED MERGED MWD DATA. * FORMAT RECORD (TYPE# 64) Entry Type(4) Size(1) Repcode(66) Logging direction is down (value= 255) Entry Type(12) Size(4) Repcode(68) Null data value is: -999.250000 Entry Type(16) Size(1) Repcode(66) Datum Specification Block Sub-type is: Entry Block terminator. Summary of entry types encountered: 1 2 3 4 5 6 7 8 91011 1213141516 000 1 0000000 1 000 1 Rep Code Count Bytes 68 11 44 Sum: 11 44 44 fndun a [F ] 1.00000000 ONE DEPTH PER FRAME Tape depth ID: F 11 Curves: APl APl APl APl Log Crv Crv Name Tool Code Samples Units Size Length Typ Typ CIs Mod 1 RHOB MWD 68 1 G/CC 4 2 PEF MWD 68 1 BN/E 4 3 DRHO MWD 68 1 G/CC 4 4 GR MWD 68 1 GAPI 4 5 FCNT MWD 68 1 CPS 4 6 NCNT MWD 68 I CPS 4 7 NPHI MWD 68 1 PU-S 4 8 NRAT MWD 68 1 RATI 4 9 RA MWD 68 1 OHMM 4 10 ROP MWD 68 1 FPHR 4 11 RP MWD 68 1 OHMM 4 498660 71 6 4 9866O 71 6 4 98660 71 6 4 98660 71 6 4 98660 71 6 498660 71 6 4 9866O 71 6 498660 71 6 4 98660 71 6 4 98660 71 6 498660 71 6 ** Routine LEVONE detects data discrepancy: DSB indicates: 1 FRAMES Data Record Length indicates: 21 FRAMES * DATA RECORD (TYPE# O) 1014 BYTES * Total Data Records: 17 Tape File Start Depth = 5971.000000 Tape File End Depth = 6147.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 596 datums Tape Subtile: 2 87 records... Minimum record length: 62 bytes Maximum record length: 1014 bytes Tape Subfile 3 is type: LIS **** FILE HEADER **** MWD .002 1024 LIS COMMENT RECORD(s): 12345678.901234567890123456789012345678901234567890123456789012345678901234567890 FILE HEADER FILE NUMBER: 2 RAW MWD Curves and log header data for each bit run in separate files. ~ BIT RUN NO: 3 DEPTH INCREMENT: 0.2500 # ~. FILE SUMMARY VENDOR TOOL CODE START DEPTH MWD 5971.0 6147.0 $ LOG HEADER DATA DATE LOGGED: ..... SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME)' TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTT'OM LOG INTERVAL (FT): "~ BIT ROTATING SPEED (RPM)' HOLE INCLINATION (DEG) MINIMUM ANGLE: --, MAXIMUM ANGLE: TOOL STRING (TOP TO BO'I-rOM) VENDOR TOOL CODE TOOL TYPE MWD NEUTRON/DENSITY $ STOP DEPTH 30 APR 93 M1.33 M1,33 MEMORY 0.0 5971.0 6147.0 0 50.1 50.2 TOOL NUMBER 2501-30 BOREHOLE CONDITIONS MUD TYPE: LSND MUD DENSITY (LB/G): 9.20 MUD VISCOSITY (S): 34.0 MUD PH: 11.8 MUD CHLORIDES (PPM): 1200 FLUID LOSS (C3): 0.0 RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): 8.500 DRILLER'S CASING DEPTH (FT)' 0.0 MUD AT MEASURED TEMPERATURE (MT): 0.000 MUD AT MAX CIRCULATING TEMPERATURE: 0.000 MUD FILTRATE AT MT: 0.000 0.0 MUD CAKE AT MT: 0.000 0.0 0.0 0.0 NEUTRON TOOL MATRIX: SANDSTONE MATRIX DENSITY: 2.65 HOLE CORRECTION (IN): 8.500 TOOL STANDOFF (IN): EWR FREQUENCY (HZ): 0.0 0 REMARKS: INTERVAL FROM 6086 TO 6095 FT (4409 TO 4415 FT TVD) WAS LOGGED 118 HOURS AFTER BEING DRILLED DUE TO CASING RUN AND CEMENTING. THIS HOLE SECTION IS ALSO 12 1/4 INCH HOLE. ANY DATA PRESENTED ABOVE 6086 FT WAS LOGGED THROUGH CASING. $ CN : Conoco Inc. WN : L-13 FN : Milne Point Unit COUN : North Slope STAT : Alaska LIS COMMENT RECORD(s): 12345678.9012345678.q0123456789012345678901234567890128456789012345678901234567890 THIS FILE CONTAINS RAW MWD DATA FROM BIT RUN 3. * FORMAT RECORD (TYPE# 64) Entry Type(4) Size(1) Repcode(66) Logging direction is down (value= 255) Entry Type(12) Size(4) Repcode(68) Null data value is: -999.250000 Entry Type(16) Size(1) Repcode(66) Datum Specification Block Sub-type is: Entry Block terminator. Summary of entry types encountered: 1 2 3 4 5 6 7 8 91011 1213141516 000 1 0 0 00 0 0 0 1 0 0 0 1 Rep Code Count Bytes 68 32 128 Sum: 32 128 128 fndun a [F ] 1.000000013 ONE DEPTH PER FRAME .... Tape depth ID: F 32 Curves: APl APl APl APl Log Crv Crv Name Tool Code Samples Units Size Length Typ Typ CIs Mod 1 AZT MWD 68 1 DEG 4 2 BDCM MWD 68 1 G/CC 4 3 BDEM MWD 68 1 MINS 4 4 BDIM MWD 68 1 PTS 4 5 CADE MWD 68 1 MMHO 4 6 CPDE MWD 68 I MMHO 4 7 DCCM MWD 68 1 4 8 DLAM MWD 68 I G/CC 4 9 DPEM MWD 68 1 MINS 4 10 DPLMMWD 68 1 PU 4 11 DPSMMWD 68 1 PU 4 12 DRHMMWD 68 1 G/CC 4 13 GRAMMWD 68 1 GAPI 4 14 GRCMMWD 68 1 GAPI 4 15 INC MWD 68 I DEG 4 16 NFBMMWD 68 1 (:;PS 4 17 NNBM MWD 68 1 CPS 4 18 NPEM MWD 68 1 MINS 4 19 NPLMMWD 68 1 PU 4 20 NPSM MWD 68 1 PU 4 21 NRCM MWD 68 1 RATI 4 22 PDCM MWD 68 1 DEG 4 23 PDDC MWD 68 1 DEG 4 24 PDEM MWD 68 1 MINS 4 25 RACM MWD 68 1 OHMM 4 26 RADE MWD 68 1 OHMM 4 27 ROPA MWD 68 1 FPHR 4 28 ROPS MWD 68 1 FPHR 4 29 RPCM MWD 68 1 OHMM 4 30 RPDE MWD 68 1 OHMM 4 31 TCDM MWD 68 1 DEGF 4 32 TVD MWD 68 1 FT 4 128 4 98660 71 6 4 98660 71 6 4 98660 71 6 49866O 71 6 49866O 71 6 498660 71 6 498660 71 6 498660 71 6 4 9866O 71 6 4 98660 71 6 49866O 71 6 4 98660 71 6 4 98660 71 6 4 9866O 71 6 498660 71 6 498660 71 6 498660 71 6 498660 71 6 4 98660 71 6 498660 71 6 4 98660 71 6 49866O 71 6 49866O 71 6 4 98660 71 6 49866O 71 6 49866O 71 6 4 9866O 71 6 498660 71 6 49866O 71 6 49866O 71 6 49866O 71 6 4 59 324 56 5 ** Routine LEVONE detects data discrepancy: DSB indicates: 1 FRAMES Data Record Length indicates: 7 FRAMES * DATA RECORD (TYPE# O) 930 BYTES * Total Data Records: 101 Tape File Start Depth = 5971.000000 Tape File End Depth = 6147.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 4098 datums Tape Subfile: 3 170 records... Minimum record length: 62 bytes Maximum record length: 930 bytes Tape Subfile 4 is type: LIS. **** FILE HEADER **** MWD .003 1024 LIS COMMENT RECORD(s): 12345678901234567890123456789012345678901234567890123456789012345678901234567890 FILE HEADER FILE NUMBER: 3 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NO: 3 DEPTH INCREMENT: 0.2500 # FILE SUMMARY VENDOR TOOL CODE START DEPTH MWD 6147.0 11017.0 LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): mD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE MWD NEUTRON/DENSITY $ STOP DEPTH O3 MAY 93 M1.33 M1.33 MEMORY 0.0 6147.0 11017.0 0 50.2 52.8 TOOL NUMBER 2501-30 BOREHOLE CONDITIONS MUD TYPE: LSND MUD DENSITY (LB/G): 10.40 MUD VISCOSITY (S): 37.0 MUD PH: 9.4 MUD CHLORIDES (PPM): 13200 FLUID LOSS (C3): 0.0 RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): 8.500 DRILLER'S CASING DEPTH (FT): 0.0 MUD AT MEASURED TEMPERATURE (MT): 0.000 MUD AT MAX CIRCULATING TEMPERATURE: 0.000 MUD FILTRATE AT MT: 0.000 0.0 MUD CAKE AT MT: 0.000 0.0 0.0 0.0 NEUTRON TOOL MATRIX: SANDSTONE MATRIX DENSITY: 2.65 HOLE CORRECTION (IN): 8.500 TOOL STANDOFF (IN): EWR FREQUENCY (HZ): 0.0 0 REMARKS: INTERVAL FROM 6146 TO 6211 FT (~.~.8 TO 4490 FT 'I'VD) WAS LOGGED 11 HOURS AFTER BEING DRILLED DUE TO A TURBINE FAILURE AND A TRIP OUT OF THE HOLE TO REPLACE SAME. INTERVAL FROM 8738 TO 8802 FT (6018 TO 6057 FT TVD) WAS LOGGED 6.5 HOURS AFTER BEING DRILLED DUE TO SHORT TRIP FOR HOLE CONDITIONING. INTERVAL FROM 10954 TO 11017 FT (7373 TO 7415 FT TVD) WAS NOT LOGGED DUE TO SENSOR OFFSET. $ CN : Conoco Inc. WN : L-13 FN : Milne Point Unit COUN : North Slope STAT :Alaska LIS COMMENT RECORD(s): 12345678901234567890123456789012345678901234567890123456789012345678901234567890 THIS FILE CONTAINS RAW MWD DATA FROM BIT RUN 3RR. * FORMAT RECORD (TYPE# 64) Entry Type(4) Size(1) Repcode(66) Logging direction is down (value= 255) Entry Type(12) Size(4) Repcode(68) Null data value is: -999.250000 Entry Type(16) Size(1) Repcode(66) Datum Specification Block Sub-type is: Entry Block terminator. Summary of entry types encountered: 1 2 3 4 5 6 7 8 91011 1213141516 0 O0 1 0000 O0 0 1 000 1 Rep Code Count Bytes 68 32 128 Sum: 32 128 128 fndun a [F ] 1.00000000 ONE DEPTH PER FRAME Tape depth ID: F 32 Curves: APl APl APl APl Log Crv Crv Name Tool Code Samples Units Size Length Typ Typ CIs Mod 1 AZT MWD 68 1 DEG 4 2 BDCM MWD 68 1 G/CC 4 3 BDEM MWD 68 1 MINS 4 4 BDIM MWD 68 1 PTS 4 5 CADE MWD 68 1 MMHO 4 6 CPDE MWD 68 1 MMHO 4 7 DCCM MWD 68 1 4 8 DLAM MWD 68 1 G/CC 4 9 DPEM MWD 68 1 MINS 4 10 DPLMMWD 68 1 PU 4 11 DPSMMWD 68 1 PU 4 12 DRHMMWD 68 1 G/CC 4 13 GRAMMWD 68 1 GAPI 4 14 GRCMMWD 68 1 GAPI 4 15 INC MWD 68 1 DEG 4 16 NFBMMWD 68 1 CPS 4 17 NNBMMWD 68 1 CPS 4 18 NPEM MWD 68 1 MINS 4 19 NPLMMWD 68 1 PU 4 20 NPSM MWD 68 1 PU 4 21 NRCM MWD 68 1 RATI 4 22 PDCM MWD 68 1 DEG 4 23 PDDC MWD 68 1 DEG 4 24 PDEM MWD 68 I MINS 4 25 RACM MWD 68 1 OHMM 4 26 RADE MWD 68 1 OHMM 4 27 ROPA MWD 68 1 FPHR 4 28 FLOPS MWD 68 1 FPHFL 4 29 RPCM MWD 68 1 OHMM 4 30 FLPDE MWD 68 1 OHMM 4 31 TCDM MWD 68 1 DEGF 4 32 TVD MWD 68 1 FT 4 128 498660 71 6 498660 71 6 4 98660 71 6 498660 71 6 498660 71 6 4 98660 71 6 4 98660 71 6 4 98660 71 6 4 98660 71 6 498660 71 6 4 98660 71 6 498660 71 6 498660 71 6 498660 71 6 498660 71 6 498660 71 6 498660 71 6 4 98660 71 6 4 98660 71 6 498660 71 6 498660 71 6 498660 71 6 4 98660 71 6 4 98660 71 6 498660 71 6 4 98660 71 6 498660 71 6 4 98660 71 6 498660 71 6 498660 71 6 498660 71 6 4 59 324 56 5 ** Routine LEVONE detects data discrepancy: DSB indicates: 1 FRAMES Data Record Length indicates: 7 FRAMES * DATA RECORD (TYPE# O) 930 BYTES * Total Data Records: 2783 Tape File Start Depth = 6147.000000 Tape File End Depth = 11017.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 111886 datums Tape Subfile: 4 2857 records... Minimum record length: 62 bytes Maximum record length: 930 bytes Tape Subfile 5 is type: LIS **** TAPE TRAILER **** MWD 93/8/27 1210 01 **** REEL TRAILER **** MWD 93/8/27 1210 01 Tape Subtile: 5 2 records... Minimum record length: 132 bytes Maximum record length: 132 bytes End of execution: Fri 27 AUG 93 3:40p Elapsed execution time = 2 minutes, 43.5 seconds. SYSTEM RETURN CODE = 0 Tape Subfile 1 is type: LIS Tape Subtile 2 is type: LIS DEPTH RHOB PEF FCNT NCNT NPHI ROP RP 5971.0000 1.9279 14.1445 12.4135 6176.6924 87.6487 -999.2500 -999.2500 5971.5000 1.9318 14.2930 12.5469 6189.0000 86.0350 -999.2500 -999.2500 6000.0000 1.8527 13.9181 17.9248 6539.7969 53.4383 -999.2500 -999.2500 6050.0000 1.8199 14.3412 14.7519 6316.8047 71.0514 244.0445 -999.2500 6100.0000 2.2761 3.0282 20.3123 6919.9707 48.0348 163.0334 -999.2500 6147.0000 2.1464 3.5075 19.7143 6762.0244 50.2603 40.5745 2.5159 Tape File Start Depth = 5971.000000 Tape File End Depth = 6147.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet DRHO NRAT -0.6427 454.8731 -0.6402 450.3555 -0.7794 333.1046 -0.7076 401.5131 0.0647 308.9242 0.0981 317.1058 GR 55.6275 -999.2500 57.2549 -999.2500 60.0569 -999.2500 53.1889 -999.2500 80.6023 -999.2500 85.6128 2.4460 Tape Subfile 3 is type: LIS DEPTH AZ'T BDCM BDEM BDIM CADE CPDE DCCM DLAM DPEM DPLM DPSM DRHM GRAM GRCM INC NFBM NNBM NPEM NPLM NPSM NRCM PDCM PDDC PDEM RACM RADE ROPA ROPS RPCM RPDE TCDM TVD 5971.0000 323.6449 1.9279 -999.2500 5.1818 -999.2500 -999.2500 -999.2500 2.5705 14.1445 45.7411 43.7632 -0.6427 -999.2500 -999.2500 50.5419 12.4135 6176.6924 18.9231 86.1445 87.6487 454.8731 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 4336.0283 5971.2500 323.6431 1.9298 -999.2500 5.2727 -999.2500 -999.2500 -999.2500 2.5712 14.2187 45.6256 43.6469 -0.6414 55.6275 58.1779 50.5403 12.5469 6189.0000 19.0000 64.2978 86.0350 450.3555 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 4336.1885 6000.0000 323.5773 1.8527 -999.2500 21.0000 -999.2500 -999.2500 -999.2500 2.6236 13.9181 50.6306 48.3202 -0.7794 60.0569 62.8104 50.4000 17.9248 6539.7969 35.0000 49.5879 53.4383 333.1046 -999.2500 -999.2500 -999.2500 0.0835 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 4354.6621 6050.0000 324.2014 1.8199 150.7686 91.8333 -999.2500 -999.2500 45.2329 2.5268 14.3412 52.0961 50.3120 -0.7076 53.1889 55.6275 50.4000 14.7519 6316.8047 157.0000 67.9875 71.0514 401.5131 -999.2500 -999.2500 117.1667 O. 1173 -999.2500 244.2865 244.0445 31.3252 -999.2500 77.5400 4386.5352 6100.0000 324.8256 2.2761 201.0506 199.6667 -999.2500 -999.2500 153.2342 2.2113 3.0282 25.3785 22.6594 0.0647 80.6023 84.2977 50.4000 20.3123 6919.9707 209.0000 44.0956 48.0348 308.9242 -999.2500 -999.2500 180.2000 2.5731 -999.2500 151.5168 163.0334 2.1631 -999.2500 76.3742 4418.4072 6147.0000 325.0760 2.1464 738.3152 234.5001 408.8281 397.4678 144.7733 2.0483 3.5075 32.9615 30.5237 0.0981 85.6128 89.5379 50.6479 19.71 43 6762.0244 738.0000 46.4262 50.2603 317.1058 15.8966 15.5949 400.6.3.33 2.5703 2.4460 35.0096 40.5745 2.4360 2.5159 83.5531 ~.~.A.8.2061 Tape File Start Depth = 5971.000000 Tape File End Depth = 6147.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = Feet Tape Subtile 4 is type: LIS DEPTH AZT BDCM BDEM BDIM CADE CPDE DCCM DLAM DPEM DPLM DPSM DRHM GRAM GRCM INC NFBM NNBM NPEM NPLM NPSM NRCM PDCM PDDC PDEM RACM RADE ROPA ROP$ RPCM RPDE TCDM TVD 6147.0000 325.0760 2.1464 738.3152 234.5001 408.8281 397.4678 144.7733 2.0483 3.5075 32.9615 30.5237 0.0981 85.6128 89.5379 50.6479 19.7143 6762.0244 738.0000 46.4262 50.2603 317.1058 15.8966 15.5949 400.6333 2.5703 2.4460 35.0098 40.5745 2.4360 2.5159 83.5531 ~.~.~8.2061 6147.2500 325.0742 2.1466 737.9253 234.5834 384.8010 402,8488 145.7104 2,0458 3.5301 32.9452 30.5068 0.1008 63.3700 87.1924 50.6516 18.6534 6789.4209 738.0000 50.5484 54.3197 335.4393 16.0256 15.7211 483.9458 2.7417 2.5987 35.0098 36.8646 2.4033 2.4823 83.7500 4448.3633 6150.0000 325.0541 2.1 637 733.9840 235.7500 395.5446 396.1425 144.5512 2.0753 3.1684 31.9364 29.4738 0.0886 75.3839 78.8401 50.6917 19.9812 6793.1953 736.0001 45.4611 49.3360 313.5677 15.8662 15.5637 731.0332 2.6810 2.5282 61.2595 39.6488 2.4438 2.5243 64.6781 4450.0898 6200.0000 324.6896 2.2048 702.1410 267.5000 407.6370 411.0065 147.0731 2.0913 3.5486 29.5578 26.9842 0.1132 97.1911 101.6472 51.4208 19.2773 6669.5117 704.0000 45.6279 49.5491 315.8778 16.2131 15.9109 696.9165 2.5804 2.4532 193.1528 194.8559 2.3569 2.4331 86.9643 4481.4873 6250.0000 324.3968 2.3225 25.8681 300.1666 389.6703 392.6441 1 43.9607 2.2849 3.4128 22.6751 19.8515 0.0374 107.3601 112.2823 51.8774 19.4474 6906.9180 36.0000 47.5249 51.4165 324.2604 15.7849 15.4811 20.7500 2.7036 2.5663 248.4307 269.9209 2.4649 2.5468 80.3268 4512.6064 6300.0000 324.1817 2.2264 33.6980 330.9999 277.5681 257.8330 118.1906 2.2151 3.7270 28.5241 25.6703 0.0071 97.5795 102.0533 52.0387 23.7815 7068.9951 35.0000 36.4150 40.3659 271.3869 12.2413 11.9579 29.0944 3.8423 3.6027 201.7885 204.7321 3.7344 3.8785 82.3250 4543.4238 DEPTH CADE DPLM INC NPSM RACM RPDE 6350.0000 290.9824 25.2281 52.1969 41.1747 3.6631 3.4501 6400.0000 424.5858 21.5776 52.3531 39.3424 2.4718 2.4203 6450.0000 303.8342 28.8269 52.4722 44.1773 3.5123 2.9604 6500.0000 337.4269 22.6625 52.5753 46.0880 3.1389 2.9666 6550.0000 358.8503 25.5303 52.5183 40.7298 2.9391 2.9826 6600.0000 297.4378 25.2018 52.4108 39.1014 3.5879 3.1438 AZT CPDE DPSM NFBM NRCM RADE TCDM 324.2291 289.8482 22.5O92 23.2054 275.1227 3.4366 84.3617 324.4375 413.1649 18.7258 23.7972 265.9151 2.3552 86.2250 324.2474 337.7967 26.2440 21.6434 290.5441 3.2913 86.9818 323.8866 337.0913 19.8545 21.2634 299.7686 2.9636 88,7844 323.8000 335.2833 22.7799 23.6680 273.1117 2.7867 89.9375 323.8000 318.0028 22.5516 24.1191 264.8012 3.3620 92.0750 BDCM DCCM DRHM NNBM PDCM ROPA TVD 2.2786 124.6338 0.0352 6963.9990 13.1539 236.2210 4574.1133 2.3410 147.4562 0.0658 6920.4766 16.2657 131.0611 4604.7246 2.2170 134.1027 0.1234 6887.5693 14.4288 300.9428 4635.2139 2.3224 133.9722 0.0289 6981.2920 14.4111 117.6685 4665.6523 2.2741 133.6555 0.0289 7069.1250 14.3672 149.5677 4696.0908 2.2779 130.3857 0.0614 6995.3730 13.9174 230.7017 4726.5293 BDEM DLAM GRAM NPEM PDDC ROPS 35.5649 2.2434 87.2715 47.0000 12.8642 236.2452 45.3622 2.2752 104.0747 47.000O 15.9608 131.2549 42.8859 2.0937 94.5170 44.0000 14.1337 307.0981 45.4106 2.2936 106.3753 46.0000 14,1161 126.0112 52.6525 2.2445 83.5200 53.3750 14.0698 201.4245 46.1720 2.2177 81.1579 48.0000 13.6235 244.0445 BDIM DPEM GRCM NPLM PDEM RPCM 371.3999 3.3858 91.2727 37.2314 21.2000 3.3266 401.1667 3.4123 108.8463 35.4041 39.3333 2.3441 446.3334 3.4504 98.6504 40.2158 25.6164 2.8606 488.1819 3.2158 111.2524 42.1334 39.5249 2.8665 522.9998 3.0112 87.3492 36.7810 26.9497 2.8808 554.8334 3.2562 84.8788 35.1610 41.2833 3.0349 DEPTH CADE DPLM INC NPSM RACM RPDE 6650.0000 342.9596 24.9389 52.4469 37.7180 3.0919 2.7957 6700.0000 276.8887 24.3571 52.4990 32.1963 3.8749 3.1838 6750.0000 497.6548 23.0332 52.5527 32.9511 2.0904 2.4788 6800.0000 360.1670 23.8963 52.6063 41.1788 2.9299 2.9005 6850.0000 274.2906 21.9150 52.6589 35.9582 3.9040 3.4473 6900.0000 320.0427 21.6199 52.7115 35.7215 3.3193 3.0603 AZT CPDE DPSM NFBM NRCM RADE TCDM 323.8000 357.6876 22.2043 24.7565 257.4609 2.9158 93.6050 323.8000 314.0883 21.6271 28.6413 226.7238 3.6116 95.2089 323.5892 403.4185 20.3310 27.9200 231.0627 2.0094 96.4625 323.2042 344.7669 21.1493 23.5041 275.5589 2.7765 98.0375 321.5726 290.0820 19.0826 26.0324 247.9163 3.6458 99.3875 320.300O 326.7681 18.7309 26.3286 246.6007 3.1248 101.0750 BDCM DCCM DRHM NNBM PDCM ROPA TVD 2.2836 137.7541 0.0357 6981.1973 14.9311 126.2660 4756.9980 2.2932 129.6174 0.0169 7112.~.3 13.8119 228.4351 4787.4707 2.3145 145.8097 0.0409 7066.0059 16.0392 132.1769 4817.8760 2.3010 135.4035 0.0272 7093.9316 14.6080 142.9232 4848.2715 2.3351 124.8822 0.0631 7068.8574 13.1606 134.6258 4878.6104 2.3409 132.0477 0.0732 7110.0586 14.1468 108.4194 4908.9326 BDEM DLAM GRAM NPEM PDDC ROPS 44.0575 2.2478 93.9289 48.0000 14.6341 97.2774 47.4251 2.2766 106.1333 49.000O 13.5182 236.2452 48.4672 2.2752 92.5708 50.0000 15.7345 157.3938 68.8826 2.2742 94.9654 76.0000 14.3107 136.3033 72.5662 2.2722 111.8010 74.0000 12.8706 163.1266 57.1997 2.2671 103.1074 58.6667 13.8503 111.1863 BDIM DPEM GRCM NPLM PDEM RPCM 590.3334 3.0574 98.2354 33.7931 20.9667 2.7036 630.2501 3.0098 110.9993 28.3736 41.6611 3.0730 671.7999 3.4585 98.8150 29.1107 41.0492 2.3999 722.0000 3.1763 99.3194 37.2229 56.2943 2.8032 768.6667 3.5022 116.9269 32.0589 65.1161 3.3239 837.1667 3.8149 107.8347 31.8265 49.73,,33 2.9551 DEPTH CADE DPLM INC NPSM RACM RPDE 6950.0000 305.5986 21.7808 52.7635 32.1193 3.4828 3.2034 7000.0000 298.3295 21.5688 52.7840 37.3386 3.5718 3.2756 7050.0000 297.4180 23.0229 52.7309 32.5014 3.5895 3.1142 7100.0000 305.3679 22.1243 52.6777 40.6000 3.4928 2.9940 7150.0000 304.6340 21.7244 52.6245 34.2791 3.5035 2.9744 7200.0000 330.8562 22.7226 52.6000 41.9061 3.2079 2.8880 AZT CPDE DPSM NFBM NRCM RADE TCDM 32O.300O 312.1674 18.9318 28.6613 225.0789 3.2723 103.4375 320.1245 305.2917 18.8814 25.2173 253.8660 3.3520 104.5625 319.5394 321.1108 20.2036 28.4384 227.2574 3.3623 106.0250 319.2000 333.9966 19.5837 24.0699 270.8066 3.2747 107.4875 319.2000 336.2073 18.9953 27.2603 237.2039 3.2826 108.9500 319.3149 346.2631 19.8620 22.9389 277.1318 3.0225 109.1750 BDCM DCCM DRHM NNBM PDCM ROPA TVD 2.3376 129.2540 0.0674 7065.7715 13.7618 91.3753 4939.1973 2.3385 127.9104 0.0690 7011.8516 13.5770 196.2379 4969.4629 2.3166 130.9549 0.0468 7078.6826 13.9959 139.7556 4999.7275 2.3269 133.4099 0.0554 7139.4199 14.3334 148.1640 5030.0215 2.3368 133.8085 0.0545 7077.1973 14.3884 154.7316 5060.3555 2.3223 135.6728 0.0324 6944.9023 14.6448 178.1978 5090.7090 BDEM DLAM GRAM NPEM PDDC ROPS 49.8280 2.2702 98.3750 52.0000 13.4673 85.1653 41.5511 2.2718 98.7327 48.0000 13.2838 190.0600 67.5409 2.2695 100.5992 71.0000 13.7029 135.0120 39.9398 2.2763 97.3619 42.0000 14.0368 153.9565 63.1005 2.2841 97.4458 65.0000 14.0935 174.2488 31.0716 2.2890 97.0342 54.0000 14.3484 192.7426 BDIM DPEM GRCM NPLM PDEM RPCM 886.3333 3.4507 105.0964 28.2985 41.3500 3.0912 939.5000 3.2542 105.4786 33.4186 28.4000 3.1600 998.3999 3.4728 107.4726 28.6714 60.5667 3.0072 1063.7500 3.0554 104.0141 36.6474 28.9167 2.8920 1096.7500 3.3196 104.1038 30.4115 54.9,3,33 2.8739 1132.8574 3.1071 103.6641 37.9543 26.0333 2.7915 DEPTH CADE DPLM INC NPSM RACM RPDE 7250.000O 305.7045 21.8864 52.600O 30.8229 3.4723 3.5058 7300.0000 367.0483 22.8279 52.6333 33.5062 2.8780 2.6518 7350.0000 420.6700 26.0525 52.6838 38.1661 2.4961 2.4052 7400.0000 366.0923 18.7320 52.6630 32.6340 2.8851 2.6758 7450.0000 367.1895 19.4165 52.6087 38.9494 2.8798 2.5815 7500.0000 428.8640 20.0040 52.6000 36.5112 2.4471 2.3544 AZT CPDE DPSM NFBM NRCM RADE TCDM 319.5276 265.2446 19.0518 30.0107 217.6039 3.2711 110.4125 319.4667 377.1060 19.7139 27.8713 232.9328 2.7244 110.6375 319.2646 415.7729 23.3015 25.0862 258.2396 2.3772 112.3250 318.6826 373.7256 15.7688 27.7562 229.7105 2.7316 112.5500 317.9217 387.3754 17.1618 24.6416 262.3318 2.7234 114.3500 317.4937 424.7302 17.2075 26.0310 249.4420 2.3317 115.0250 BDCM DCCM DRHM NNBM PDCM ROPA TVD 2.3356 123.9127 O.O329 7152.7324 13.0273 151.9499 5121.0771 2.3247 141.2419 0.0114 7110.7734 15.4109 134.7157 5151.4238 2.2655 147.9032 0.0306 7095.5605 16.3245 133.5695 5181.7578 2.3898 140.6403 0.0718 6983.4502 15.3254 89.4258 5212.0928 2.3668 140.0286 0.0587 7080.2695 15.6551 114.5103 5242.4277 2.3661 149.38,53 0.0631 7111.9629 16.5284 63.7163 5272.7910 BDEM DLAM GRAM NPEM PDDC ROPS 52.9333 2.3028 100.2902 56.0000 12.7370 147.6618 64.6834 2.3083 83.5601 67.0000 15.1094 126.1802 71.1256 2.2339 94.8390 74.0000 16.0209 166.4595 62.3566 2.3179 107.3752 65.0000 15.0265 74.4708 73.9645 2.3193 118.7375 81.0000 15.3549 118.1262 83.4162 2.3048 101.5611 86.0000 16.2249 33.4329 BDIM DPEM GRCM NPLM PDEM RPCM 1178.1997 3.2942 107.1425 27.0356 45.4833 3.3790 1237.5002 2.9738 89.2693 29.6535 34.2500 2.5654 1300.4998 3.0931 101.3189 34.2357 60.98,33 2.3293 1356.7500 3.6903 114.7115 29.0940 38.6.333 2.5885 1438.0000 3.5660 126.8502 35.0105 59.1667 2.4987 1504.7498 3.6409 108.5002 32.6032 63.53,,33 2.2812 DEPTH CADE DPLM INC NPSM RACM RPDE 7550.0000 424.9886 21.9772 52.6000 31.4999 2.4734 2.2474 7600.0000 382.8047 20.7249 52.6000 34.3521 2.7578 2.4207 7650.0000 427.6498 19.5064 52.5979 33.0146 2.4574 2.2380 7700.0000 405.6478 21.5675 52.5458 32.0235 2.5965 2.3238 7750.0(X)0 408.0462 20.2955 52.5063 32.0896 2.5799 2.3390 7800.0000 364.0633 17.7965 52.5589 38.2648 2.9014 2.7053 AZT CPDE DPSM NFBM NRCM RADE TCDM 317.1292 ~..'H..9577 19.1089 29.2945 221.5236 2.3530 116.4675 317.1000 413.0986 17.8286 27.2115 237.6504 2.6123 115.9250 317.0654 446.8355 16.5718 28.1972 230.1656 2.3384 117.7250 316.7208 430.3246 18.7488 29.2477 224.5308 2.4652 117.9500 316.4189 427.5417 17.3562 29.2181 224.9094 2.4507 119.1875 316.5768 369.6401 15.0743 25.2190 256.6433 2.7468 119.4125 BDCM DCCM DRHM NNBM PDCM ROPA TVD 2.3347 152.7035 0.0443 7107.7910 16.9849 122.1 982 5303.1602 2.3558 147.4576 0.0400 7083.0439 16.2632 159.2104 5333.5293 2.3766 153.0076 0.0731 7108.4639 17.0267 107.4388 5363.8994 2.3406 150.3350 0.0192 7192.7822 16.6591 113.6029 5394.3027 2.3636 149.8503 0.0403 7197.6084 16.5924 139.6647 5424.7070 2.4013 139.9082 0.0662 7135.3359 15.2257 89.3466 5455.1104 BDEM DLAM GRAM NPEM PDDC ROPS 64.1816 2.2899 101.5115 68.0000 16.6800 132.2973 65.2914 2.3156 102.5828 68.0000 15.9562 165.3716 64.3751 2.3033 103.9587 67.0000 16.7217 96.2954 63.2675 2.3220 103.0102 66.0000 16.3518 126.8762 60.6300 2.3227 92.9810 63.0000 16.2888 152.5879 54.3515 2.3394 111.8572 56.3333 14.9271 95.7027 BDIM DPEM GRCM NPLM PDEM RPCM 1554.7500 3.1696 108.4472 27.6947 54.7000 2.1788 1621.0000 3.1702 109.5918 30.4819 55.0063 2.3441 1679.2500 3.2885 111.0616 29.1727 54.1333 2.1698 1742.2498 3.1524 110.0483 28.2050 50.8167 2.2512 1794.6667 3.0680 99.3,339 28.2696 52.1167 2.2664 1639.5000 3.3070 119.4998 34.3365 47.3917 2.6170 DEPTH CADE DPLM INC NPSM RACM RPDE 7850.0000 327.7250 18.0617 52.6340 31.1396 3.2401 2.8996 7900.0000 358.7077 18.4526 52.7887 35.1504 2.9488 2.6674 7950.0000 339.6804 17.5495 52.9301 35.1373 3.1206 2.8217 8000.0000 353.4219 20.1901 53.0376 32.8557 2.9961 2.6700 8050.0000 296.0673 17.9025 53.1437 31.1914 3.6099 3.0222 8100.0000 369.3536 20.1346 53.2479 37.4064 2.8584 2.66O5 AZT CPDE DPSM NFBM NRCM RADE TCDM 316.7000 344.8735 15.0797 30.0308 219.4420 3.0513 120.3125 316.7000 374.9003 15.5034 26.8438 242.0330 2.7878 120.2000 316.7000 354.3998 14.5491 27.1772 241.9735 2.9439 120.5857 316.7000 374.5358 17.1690 28.6032 229.2677 2.8295 121.0813 316.6343 330.8824 14.9685 29.9618 219.7416 3.3776 121.4375 316.4781 375.8628 17.1727 25.5799 254.2263 2.7074 122.54(X) BDCM DCCM DRHM NNBM PDCM ROPA TVD 2.4012 135.4379 0.0494 7217.9902 14.6097 1 43.0762 5485.4834 2.3942 140.8716 0.0505 7114.3398 15.3572 127.5842 5515.7480 2.4099 137.1714 0.0689 7202.0010 14.8482 230.2964 5545.9639 2.3667 1 40.7834 0.0249 7182.6885 15.3451 165.1340 5576.0547 2.4030 132.8259 0.0627 7211.2314 14.2503 155.2187 5606.0869 2.3667 141.0393 0.0410 7122.7510 15.3803 130.0365 5636.0381 BDEM DLAM GRAM NPEM PDDC ROPS 52.2592 2.3517 100.8688 54.0000 14.3123 147.5417 45.6754 2.3440 104.9530 47.0000 15.0,550 118.1226 32.0464 2.3410 101.7821 36.0000 14.5513 267.9642 46.2134 2.3398 105.5511 48.0000 15.0462 168.7564 36.0046 2.3412 97.1656 38.0000 13.9557 126.2798 59.0195 2.3247 118.6035 61.0000 15.0783 141.7553 BDIM DPEM GRCM NPLM PDEM RPCM 1885.0002 3.3724 107.7606 27.3438 45.4500 2.8017 1924.2500 3.4068 112.1238 31.2656 39.5500 2.5796 1963.1687 3.5728 108.73 64 31.2524 24.4667 2.7278 2000.5000 3.1724 112.7629 29.0175 39.4388 2.5830 2049.3994 3.3786 103.8045 27.3942 28.6661 2.9188 2105.2500 3.3028 126.7071 33.4855 46.3661 2.5731 DEPTH CADE DPLM INC NPSM RACM RPDE 8150.0000 381.2142 20.6177 53.3260 45.3390 2.7644 2.8310 8200.0000 325.1848 20.7436 53.3781 39.0069 3.2672 2.9119 8250.0000 311.7281 19.1490 53.5208 33.7480 3.4092 3.1920 8300.0000 266.8078 23.2069 53.7292 29.7858 4.0203 3.5292 8350.00(X) 347.3150 20.7060 53.8702 31.1381 3.0544 2.5871 8400.0(XX) 324.0228 21.7183 53.9766 29.9208 3.2823 2.8379 AZT CPDE DPSM NFBM NRCM RADE TCDM 316.2958 380.0790 17.7146 21.9699 294.0581 2.6232 122.4500 316.0875 343.4235 17.6612 25.1991 262.6161 3.0752 124.1375 315.9094 313.2793 16.2472 28.0714 234.1326 3.2079 124.1375 315.7531 283.3472 20.4146 31.1206 211.5314 3.748O 125.8250 315.8053 386.5295 17.8250 29.9258 219.4319 2.8792 124.4750 315.9649 352.3746 18.8780 31.3125 212.3262 3.0862 125.7125 BDCM DCCM DRHM NNBM PDCM ROPA TVD 2.3577 141.7838 0.0321 7076.0283 15.4799 127.7439 5665.9375 2.3586 135.1751 O.O258 7246.7627 14.5737 141.5042 5695.7852 2.3819 129.4868 0.0301 7180.1406 13.7910 175.3525 5725.5293 2.3132 123.5307 0.0522 7210.2734 12.9720 128.5883 5755.1992 2.3559 142.8978 0.0326 7192.2500 15.6360 154.2095 5784.7305 2.3385 136.7902 0.0265 7282.0000 14.7985 192.9397 5814.1904 BDEM DLAM GRAM NPEM PDDC ROPS 44.1293 2.3253 95.6477 62.5000 15.1801 131.1461 54.5572 2.3295 103.8514 57.0000 14.2757 153.5491 45.9735 2.3524 109.2649 74.0000 13.4968 192.7426 64.5128 2.2610 93.0676 66.0000 12.6843 91.5527 54.8031 2.3233 112.0072 57.0000 15.3357 148.9417 56.0275 2.3121 109.2260 57.0000 14.5019 196.8824 BDIM DPEM GRCM NPLM PDEM RPCM 2157.3999 2.8838 102.1828 41.3807 36.3667 2.5456 2199.2500 3.0925 110.9471 35.0678 45.6,389 2.8131 2247.0000 3.4874 116.7303 29.8943 37.4000 3.0795 2280.8564 3.1251 99.4265 26.0277 58.6167 3.4011 2318.3,335 3.1177 119.6601 27.3424 22.0833 2.5035 2354.4282 3.0036 116.6888 26.1587 50.8167 2.7438 DEPTH CADE DPLM INC NPSM RACM RPDE 8450.0000 357.3065 20.8310 54.1232 33.0633 2.9610 2.6789 8500.0000 368.9626 19.0760 54.2811 33.2223 2.8639 2.5888 6550.0000 375.1545 18.8131 53.1172 32.3963 2.8179 2.5151 8600.0000 284.9857 19.6186 51.8021 27.5821 3.7555 3.1980 8650.0000 309.2711 19.6994 51.9085 28.7551 3.4465 2.9610 8700.0000 322.2139 20.6857 52.0173 31.1480 3.2987 2.957O AZT CPDE DPSM NFBM NRCM RADE TCDM 316.1642 373.2808 18.2107 28.7294 230.4407 2.7987 126.0360 316.3747 386.2799 16.1260 28.9064 231.3094 2.7103 126.8375 316.0688 397.6035 15.9712 29.0625 226.6596 2.6656 122.7125 315.7000 312.6990 16.7011 33.7377 198.3563 3.5089 123.3500 315.7000 337.7285 16.8535 32.2448 205.4121 3.2334 124.8286 315.6395 338.1771 17.8071 30.3184 219.4904 3.1035 126.1625 BDCM DCCM DRHM NNBM PDCM ROPA 'I'VD 2.3495 140.5515 0.0098 7251.2930 15.3159 168.0238 5843.5127 2.3839 142.8373 0.0357 7320.0020 15.6303 1 64.4564 5872.7959 2.3865 144.7989 0.0790 7214.9980 15.9001 78.9536 5902.7568 2.3744 129.3580 0.0550 7328.9854 13.7761 170.9987 5932.8271 2.3719 134.0927 0.0481 7254.0(X)0 14.4274 125.6889 5963.6787 2.3562 134.1740 0.0284 7268.7109 14.4388 208.3613 5994.5117 BDEM DLAM GRAM NPEM PDDC ROPS 109.2099 2.3440 94.5698 120.0000 15.0171 248.6601 144.5552 2.3481 102.7681 148.0000 15.3301 148.9417 63.5619 2.3093 116.6452 64.0000 15.5985 70.3697 47.2038 2.3196 100.1055 48.0000 13.4817 192.5908 48.5537 2.3250 103.1725 48.0000 14.1323 80.5987 48.5278 2.3278 102.2659 51.0000 14.1438 215.2486 BDIM DPEM GRCM NPLM PDEM RPCM 2390.333O 2.9027 101.0313 29.2203 22.4500 2.5919 2468.1670 3.1296 109.7897 29.3766 130.0167 2.5057 2502.6665 3.4127 124.61 50 28.5689 36.2667 2.4351 2532.4287 3.2711 106.9452 23.8934 42.0633 3.0860 2565.5000 3.3459 110.2217 25.0283 39.0500 2.8611 2599.9995 3.0334 109.2532 27.3519 40.9944 2.8574 DEPTH CADE DPLM INC NPSM RACM RPDE 8750.0000 323.5024 20.4110 52.1407 31.3951 3.2889 2.8084 8800.0000 316.9634 19.4890 52.2274 33.4424 3.3558 2.9791 8850.0000 303.6820 17.4383 52.2800 28.6035 3.5181 3.1562 8900.0000 349.3708 19.3382 52.3979 29.3117 3.0342 2.6818 8950.0000 303.1989 14.2335 52.5558 28.4691 3.5245 3.4668 9000.0000 248.5294 14.3334 52.6774 29.1696 4.3343 3.7451 AZT CPDE DPSM NFBM NRCM RADE TCDM 315.2074 356.0712 17.5145 29.7186 220.9093 3.0912 126.1625 315.1916 335.6755 16.5758 27.5446 232.5749 3.1549 127.4000 315.5600 316.8414 14.4217 32.6663 204.5097 3.2929 117.9259 315.5695 372.8843 16.4050 32.0939 208.7281 2.8623 118.2875 315.3589 288.4544 11.0914 32.5309 203.6776 3.2982 121.2125 315.3000 267.0142 11.5104 31.7655 207.8849 4.0237 122.4500 BDCM DCCM DRHM NNBM PDCM ROPA TVD 2.3610 137.4639 0.0516 7189.5010 14.8911 163.0986 6025.2268 2.3765 133.7327 0.0870 7016.6279 14.3778 171.0634 6055.8867 2.4120 130.1419 0.0407 7317.1602 13.8840 190.7061 6086.498O 2.3793 140.4799 0.0133 7337.2314 15.3062 151.3187 6117.0234 2.4670 124.5479 0.0338 7251.9883 13.1146 117.9496 6147.4961 2.4601 120.1 387 0.0510 7232.6340 12.5087 153.9750 6177.8437 BDEM DLAM GRAM NPEM PDDC ROPS 459.4800 2.3094 108.8936 460.9999 14.5943 180.2978 463.3893 2.2897 105.9996 484.0000 14.0802 182.5812 56.0404 2.3711 107.4317 61.0000 13.5912 198.8132 44.1095 2.3660 98.4948 54.0000 15.0075 126.4643 45.6847 2.4328 126.2299 47.3333 12.8261 126.1802 44.2481 2.4139 143.7015 49.0000 12.2235 146.4843 BDIM DPEM GRCM NPLM PDEM RPCM 2648.4282 3.0473 116.3337 27.5928 452.7167 2.7156 2695.6001 3.0632 113.2419 29.5911 4.53.5167 2.8773 2737.4995 2.9995 114.7719 24.6814 46.4500 3.0469 2783.3999 2.9359 105.2245 25.5676 30.7667 2.5947 2819.5000 3.5327 134.8545 24.7520 39.2667 3.3427 2655.0000 3.5602 153.5199 25.4299 23.0167 3.6073 DEPTH CADE DPLM INC NPSM RACM RPDE 9050.0000 276.5914 14.8319 52.7849 26.6507 3.8734 3.3327 9100.0000 314.6467 16.3443 52.9773 26.6602 3.3779 3.1049 9150.000O 274.8582 16.5308 53.1835 30.8260 3.8,997 3.3435 9200.0000 265.1669 14.6010 53.2489 29.3234 4.0539 3.3713 9250.0(X)0 264.0814 14.4763 53.3043 25.3825 4.0760 3.2676 9300.0000 286.7935 15.9301 53.4106 30.2081 3.7312 3.1475 AZT CPDE DPSM NFBM NRCM RADE TCDM 315.3000 300.0542 11.7052 34.6875 192.4571 3.6154 124.1375 315.1670 322.0757 13.3035 34.6784 192.4859 3.1782 125.1500 315.0123 299.0881 13.5090 30.9465 217.2987 3.6382 126.2429 315.0(X)0 296.6201 11.4971 31.5976 208.5280 3.7712 126.7250 314.9851 306.0356 11.2658 37.4789 184.6422 3.7867 128.3000 314.6127 317.7129 12.9000 31.2414 213.7315 3.4868 128.3675 BDCM DCCM DRHM NNBM PDCM ROPA 'rVD 2.4569 126.8687 0.0290 7312.0000 13.4348 209.6882 6208.1426 2.4305 131.1395 0.0351 7304.9990 14.0222 139.0769 6238.2627 2.4271 126.6856 0.0204 7361.4375 13.4096 261.3724 6268.3535 2.4603 126.1773 0.0626 7216.7939 13.3400 127.2624 6298.2842 2.4641 128.0576 0.0116 7576.9746 13.5983 151.6904 6328.1963 2.4372 130.3110 0.0238 7313.5547 13.9083 139.5068 6358.0078 BDEM DLAM GRAM NPEM PDDC ROPS 50.3589 2.4274 118.2406 52.0000 13.1431 212.6619 43.6349 2.3954 119.8867 45.0000 13.7291 122.1034 43.0873 2.4069 114.7508 45.0000 13.1174 295.0834 52.7445 2.3977 104.7512 ' 54.0000 13.0504 102.3660 49.5807 2.4509 106.7975 52.000O 13.3047 171.8334 43.2486 2.4140 105.9313 45.0000 13.6147 147.6618 BDIM DPEM GRCM NPLM PDEM RPCM 2904.2002 3.4612 126.9927 22.9942 43.4833 3.2150 2937.~,'H8 3.4229 128.7606 23.0041 23.3167 2.9983 2973.9995 3.1425 123.2445 27.0394 36.1500 3.2248 3022.0000 3.7312 112.5047 25.5790 39.3186 3.2523 3058.9995 3.6655 114.7025 21.7729 43.9497 3.1524 3096.4282 3.3800 113.7722 26.4378 35.8499 3.0 ,.'.'.'.'.'.'.'.'.'~ DEPTH CADE DPLM INC NPSM RACM RPDE 9350.0000 282.7856 14.6382 53.5253 30.4118 3.78O9 3.3673 9400.0000 299.0971 12.9738 53.6832 28.8437 3.5668 3.1366 9450.0000 279.5519 15.3828 53.8415 28.5968 3.8286 3.3549 9500.0000 316.678O 15.6276 54.0011 32.5492 3.3635 2.9262 9550.0000 358.4175 18.1892 54.1600 34.0006 2.9467 2.8394 9600.(XX)0 278.0491 15.5576 54.3179 32.2561 3.8472 3.4591 AZT CPDE DPSM NFBM NRCM RADE TCDM 314.3000 296.9701 11.5668 31.1791 214.8120 3.5362 129.3125 314.3000 318.8188 9.8943 32.3752 205.6208 3.3434 129.7203 314.2032 298.0688 12.3016 32.4443 204.2007 3.5772 130.5725 313.8308 341.7371 12.5882 29.2462 227.2103 3.1578 131.0000 313.7400 352.1871 14.9714 27.4674 235.2959 2.7900 131.1500 314.1084 289.0930 12.4235 29.3309 225.5462 3.5965 132.80(X) BDCM DCCM DRHM NNBM PDCM ROPA TVD 2.4591 126.2485 0.0232 7321.9531 13.3495 1 63.8700 6387.7910 2.4867 130.5295 0.0685 7280.9990 13.9383 193.5159 6417.4268 2.4470 126.4668 0.0559 7254.3906 13.3795 186.3504 6447.0078 2.4423 1 34.8322 0.0495 7278.2402 14.5302 133.8134 6476.4326 2.4030 136.7544 0.0245 7072.2002 14.7946 203.3668 6505.7773 2.4450 124.6759 0.0051 7245.8711 13.1333 129.2434 6534.9893 BDEM DLAM GRAM NPEM PDDC ROPS 43.8645 2.4365 105.2970 45.4000 13.0599 120.5685 47.5168 2.4196 119.4044 49.0000 13.6437 184.5472 48.6898 2.3911 114.0463 50.0000 13.0898 201.5093 42.6288 2.39,33 114.0318 45.0000 14.2348 114.2258 31.3989 2.3745 114.6987 33.0000 14.4980 212.6138 60.7380 2.4388 136.3181 94.0000 12.8443 166.4595 BDIM DPEM GRCM NPLM PDEM RPCM 3134.4277 3.3156 113.0910 26.6387 37.5331 3.2484 3171.3330 3.4872 128.2425 25.1157 40.2687 3.0279 3209.1670 3.3509 122.4879 24.8752 41.9667 3.2366 3240.4995 3.4190 122.4723 28.7181 37.1250 2.8282 3283.2495 3.3305 123.1886 30.1390 25.18,33 2.7453 3316.7993 3.3277 1 46.4082 28.4320 38.18.33 3.3355 DEPTH CADE DPLM INC NPSM RACM RPDE 9650.0000 289.478O 16.9447 54.1000 31.5407 3.6896 3.2542 9700.0000 306.3072 18.0742 53.4750 31.3942 3.4881 2.8178 9750.0000 318.4434 12.9132 53.2596 32.8578 3.3388 2.9782 9800.0000 289.0602 14.9540 53.3660 28.3361 3.6999 3.1539 9850.0000 337.3509 13.9626 53.5052 32.9045 3.1388 3.0011 9900.0000 343.0439 13.5011 53.6598 31.3764 3.0951 2.6163 AZT CPDE DPSM NFBM NRCM RADE TCDM 314.3000 307.2933 13.9274 29.8973 221.4555 3.4545 132.6875 314.3000 354.8857 14.9944 30.0977 220.5775 3.2647 131.0750 314.3OOO 335.7771 9.7522 29.0937 228.9142 3.1403 131.1125 314.3000 317.0668 11.7529 32.8110 202.6534 3.4595 133.7000 314.0546 333.2068 10.6511 28.8813 229.2062 2.9643 134.7125 313.6938 382.2222 10.3662 29.9152 220.5108 2.9151 136.1750 BDCM DCCM DRHM NNBM PDCM ROPA TVD 2.4202 128.2987 0.0408 7251.8301 13.6295 204.0112 6564.3545 2.4026 137.2300 0.0422 7266.9443 14.8583 145.2300 6593.8838 2.4891 133.7332 0.0794 7290.1963 14.3771 184.0046 6623.6104 2.4561 130.1679 0.0344 7282.8789 13.8867 116.2574 6653.4912 2.4710 133.2418 0.0517 7249.5898 14.3095 172.2750 6683.2539 2.4790 142.1193 0.0570 7225.2197 15.5307 151.4379 6712.9609 BDEM DLAM GRAM NPEM PDDC ROPS 160.9207 2.3794 99.2829 186.0000 13.3363 201.3397 105.6090 2.3587 115.8935 107.0000 14.5614 155.8271 35.2132 2.4098 129.4701 55.0000 14.0795 161.0856 51.0328 2.4199 125.6024 53.0000 13.5937 104.6317 55.4568 2.4196 123.5204 57.0000 14.0135 174.3862 53.8682 2.4221 134.4884 56.0000 15.2297 180.0160 BDIM DPEM GRCM NPLM PDEM RPCM 3417.5996 3.3009 108.6317 27.7344 144.5167 3.1399 3458.5708 3.2116 124.4718 27.5926 94.2389 2.7253 3496.5000 3.5974 139.0533 29.0206 28.5500 2.8773 3537.3999 3.4782 134.8994 24.6225 43.5389 3.0456 3590.8330 3.4182 132.6633 29.0655 29.8333 2.8996 3629.6001 3.4977 144.4431 27.5744 47.7500 2.5323 DEPTH CADE DPLM INC NPSM RACM RPDE 9950.0000 301.9320 14.5586 53.8168 22.9376 3.5368 2.9661 10000.0000 304.6494 15.3968 53.9747 30.1874 3.5056 2.8935 10050.0000 295.1686 14.8162 53.4253 29.9221 3.6230 3.0041 10100.0000 305.1440 14.3953 52.7411 29.9532 3.4973 2.9528 10150. O(X)O 306.0831 13.9191 52.8469 28.9cJ08 3.4871 2.9239 10200.0000 641.5660 22.1377 52.9947 52.2891 1.61 78 1.5638 AZT CPDE DPSM NFBM NRCM RADE TCDM 313.~.~.~.2 337.1364 11.3376 39.8526 169.2974 3.3120 136.3325 313.2337 345.6075 12.2852 30.8982 213.6104 3.2825 137.8062 313.5095 332.8728 11.7205 30.7586 212.0559 3.3879 137.8625 313.8779 338.6634 11.1879 31.0840 212.2388 3.2771 136.8950 313.9000 342.0064 11.0134 32.4743 206.5575 3.2671 138.2000 313.8895 639.4825 19.3406 19.4064 320.5123 1.5587 139.2125 BDCM DCCM DRHM NNBM PDCM ROPA 'I'VD 2.4629 133.9671 0.0369 7389.8643 14.4093 193.1295 6742.5107 2.4473 135.5412 0.0494 7229.1016 14.6258 68.4692 6772.0059 2.4566 133.1774 0.0900 71 44.0732 14.3006 58.4336 6801.7959 2.4654 134.2483 0.0251 7225.8750 14.4479 160.8299 6831.6416 2.4683 134.8381 0.0383 7347.0039 14.5331 106.3751 6861.8154 2.3309 181.3945 0.0800 6812.6934 20.9268 106.7429 6892.0127 BDEM DLAM GRAM NPEM PDDC ROPS 57.8861 2.4242 116.5524 60.0000 14.1143 222.3726 129.1286 2.3973 119.1659 134.0000 14.3289 68.5132 111.5388 2.3666 121.0889 113.0000 14.0050 59.0594 60.3687 2.4387 120.2579 63.0000 14.1528 210.0186 71.2296 2.4,337 106.8309 75.0000 14.2378 131.7561 246.1682 2.2515 130.5455 251.0000 20.6075 118.1432 BDIM DPEM GRCM NPLM PDEM RPCM 3683.6665 3.3061 125.1795 19.4267 28.3333 2.8667 3768.3330 3.2004 127.9864 26.4177 107.0333 2.7972 3818.5996 3.4041 130.0518 26.1600 84.7500 2.9026 3870.0000 3.1562 129.1593 26.1902 52.2167 2.8541 3941.6665 3.3217 114.7384 25.2565 55.7611 2.8279 4060.0000 3.9384 145.5239 48.4141 216.3333 1.5225 DEPTH CADE DPLM INC NPSM RACM RPDE 10250.0000 596.3962 27.4954 52.7316 43.9374 1.7479 1.4812 10300.0000 324.0235 9.6729 52.4621 31.9526 3.2903 2.6253 10350.0000 357.0513 15.3184 52.1463 35.5279 2.9698 2.4819 10400.0000 306.1940 21.4574 51.8421 37.8098 3.4747 3.2339 10450.0000 341.1263 20.2492 51.5789 34.2551 3.1122 2.6617 10500.0000 119.7008 17.5265 51.2500 29.6447 9.6518 6.5031 AZT CPDE DPSM NFBM NRCM RADE TCDM 313.3632 675.1283 24.3186 21.9635 283.3350 1.6767 139.8875 312.8747 380.9071 6.5993 29.2548 221.5145 3.0862 143.3750 312.6642 402.9168 12.1584 26.5763 241.0896 2.8007 145.0625 312.4653 309.2256 18.3224 25.6750 253.0696 3.2659 147.0312 312.3074 375.6931 17.0805 27.5156 234.2345 2.9315 147.6500 311.9000 153.7722 14.9485 32.2219 208.3531 8.3542 147.2(X)0 BDCM DCCM DRHM NNBM PDCM ROPA TVD 2.2487 186.1225 0.0603 6816.0078 21.5749 75.8727 6922.2773 2.5411 141.8817 O. 1523 7097.8809 15.4980 51.6713 6952.5879 2.4494 145.7067 0.0763 7017.8125 16.0242 56.2311 6983.2334 2.3477 128.6468 0.0700 7116.7217 13.6774 57.3842 7013.9619 2.3682 140.9817 0.0433 7059.2676 15.3742 41.3198 7044.9854 2.4033 93.0961 0.0855 7353.2656 8.8117 83.6724 7076.1611 BDEM DLAM GRAM NPEM PDDC ROPS 261.7638 2.1795 140.3417 267.0000 21.2578 101.2538 122.5675 2.3923 143.4573 128.0000 15.1981 64.2475 112.4702 2.3698 148.3035 125.0000 15.7198 46.0245 123.0788 2.2731 138.2706 132.0000 13.3860 59.0198 1 08.9296 2.3204 133.7202 113.0000 15.0723 43.2181 95.9430 2.3248 89.2354 103.0000 8.5548 81.5600 BDIM DPEM GRCM. NPLM PDEM RPCM 4174.0000 4.6522 156.~.'!2 39.9756 244.4666 1.4434 4294.6670 4.3813 159.9172 28.1359 104.3667 2.5412 4402.0000 4.0432 165.3194 31.6358 91.6667 2.4034 4526.0000 3.9520 154.1354 33.8837 101.7687 3.1220 4639.0000 3.6449 149.0629 30.3868 89.5992 2.5753 4753.0000 4.0548 99.4740 25.8907 75.3159 6.2159 DEPTH CADE DPLM INC NPSM RACM RPDE 10550.0000 184.0804 19.1152 50.7812 28.3213 5.9760 4.8473 10600.0000 38.7606 25.5351 50.2021 26.6603 39.4419 21.0179 10650.0000 30.9037 26.3098 49.4574 29.7470 54.7318 16.5124 10700.0000 18.0147 35.1038 48.8811 31.8098 -999.2500 33.8200 10750.0000 170.6009 18.5314 48.4600 33.7113 6.5140 4.7873 10800.0000 318.8255 18.7888 48.3333 41.3549 3.3482 2.8917 AZT CPDE DPSM NFBM NRCM RADE TCDM 310.9825 206.2997 16.0114 32.4162 200.6220 5.4324 1 48.7750 310.4000 47.5786 23.1281 34.8472 190.7331 25.7994 147.1625 310.4000 50.5607 23.1633 31.4431 208.9453 32.3585 149.4500 310.2084 29.5683 32.5321 29.9562 220.7122 55.5103 150.1250 309.8400 208.8841 15.2420 28.6719 231.2673 5.8616 151.8500 309.9333 345.8187 15.7741 23.5504 270.9086 3.1365 151.7000 BDCM DCCM DRHM NNBM PDCM ROPA TVD 2.3858 106.5680 0.0638 7123.1123 10.6462 55.4424 7107.6621 2.2684 55.2649 0.0169 7279.8516 3.8721 75.1726 7139.4717 2.2678 61.3539 0.0625 7195.9316 4.6280 66.3181 7171.7441 2.1132 45.2016 0.0738 7241.7217 2.6863 36.6864 7204.3945 2.3985 107.2039 0.0300 7262.7354 10.7331 85.9596 7237.3955 2.3897 142.3012 0.0112 6987.9521 14.6483 41.0502 7270.5371 BDEM DLAM GRAM NPEM PDDC ROPS 120.1853 2.3194 94.3716 126.0000 10.3734 54.3755 104.8095 2.2564 42.6850 110.0000 3.6908 78.7530 120.1035 2.1976 64.2236 127.0000 4.4304 69.4879 94.1370 2.0359 49.1657 112.0000 2.5376 34.0758 98.0910 2.3631 110.9426 108.0000 10.4595 86.4362 101.9711 2.3775 119.7690 106.0000 14.3366 44.2985 BDIM DPEM GRCM NPLM PDEM RPCM 4860.0000 3.7096 105.1995 24.6082 100.3826 4.6,531 4976.5000 2.7260 47.5825 23.0034 81.7823 19.6824 5111.5000 3.0874 71.5925 25.9900 96.8167 15.5340 5214.5000 3.7580 54.8O68 27.9967 77.28,.33 31.3765 6326.5000 3.7197 123.6719 29.8542 77.4667 4.5945 5427.7500 4.3407 133.5110 37.3981 73.7667 2.5255 DEPTH AZT BDCM BDEM BDIM CADE CPDE DCCM DLAM DPEM DPLM DPSM DRHM GRAM GRCM INC NFBM NNBM NPEM NPLM NPSM NRCM PDCM PDDC PDEM RACM RADE ROPA ROP$ RPCM RPDE TCDM TVD 10850.0000 310.3096 2.4507 111.8022 5513.3330 377.4244 373.0369 140.5160 2.3895 3.5658 15.0300 12.0806 0.0635 118.3366 131.9142 48.3871 24.5467 7045.8965 118.0000 35.6302 39.5750 262.0677 15.3090 15.0102 98.2667 2.7922 2.6495 51.2408 50.1659 2.5933 2.6807 152.6000 7303.7666 10900.0000 310.1625 2.4972 112.8171 5605.0000 263.7507 326.1002 131.9163 2.4467 3.4885 13.2900 9.2607 0.0361 115.8298 129.1198 48.4000 30.9042 7221.8770 119.0000 26.7346 30.5134 213.3553 14.1259 13.8324 64.6833 3.7781 3.5242 75.1573 80.1954 2.9613 3.0665 151.4750 7336.9707 10950.0000 310.1000 -999.2500 -999.2500 -999.2500 275.7560 341.61 33 134.8211 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 48.4000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 14.5255 14.2302 105.7000 3.9034 3.6264 89.4618 78.7570 2.8287 2.9273 151.7000 7370.1670 11000.0000 310.1000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 48.4000 -999.2500 -999.2500 -999.2500 -999.2500 -999, 2500 -999,2500 -999, 2500 -999.2500 -999.2500 -999.2500 -999.2500 24.8273 19.5587 -999.2500 -999.2500 151.2500 7403.3633 11017.0000 310.1000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999,2500 -999.2500 -999.2500 48.4000 -999,2500 -999.2500 -999.2500 -999.2500 -999.2500 -999,2500 -999,2500 -999.2500 -999.2500 -999.2500 -999.2500 26.9583 26.9583 -999.2500 -999.2500 152.1500 7414.6494 Tape File Start Depth = 6147.000000 Tape File End Depth = 11017.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = Feet Tape Subtile 5 is type: LIS LIS VERIFICATION LISTING FOR: CONOCO, INC. L-13 MILNE POINT UNIT AZ1' BDCM BDEM BDIM CADE CPDE DCCM DLAM DPEM DPLM DPSM DRHM GRAM GRCM INC NFBM NNBM NPEM NPLM NPSM NRCM PDCM PDDC PDEM RACM RADE ROPA ROPS RPCM RPDE TCDM TVD Note: BELOW ARE THE MNEMONICS THAT CAN BE FOUND ON THE LIS TAPE GENERATED FOR CONOCO, INC. WELL L-13 Azimuth - True (Posted) Bulk Density Compensated [RWD] Bulk Density Time Since Drilled [RWD] Bulk Density Data Density Integrated [RWD] Conductivity (AT) Corrected for Dielectric Effect [RWD] Conductivity (PD) Corrected for Dielectric Effect [RWD] Calculated Dielectric Constant Density Long Space Apparent [RWD] Photoelectric Cross Section [RWD] Density Porosity (LS) [RWD] Density Porosity (SS) [RWD] Delta RHO - Density [RWD] Gamma Ray Memory (APl) [RWD] Gamma Ray Borehole Corrected [RWD] Inclination - True (Posted) Neutron Far Base [Base] Neutron Near Base [Base] Neutron Porosity Time Since Drilled [RWD] Neutron Porosity (LS) Borehole Corr [RWD] Neutron Porosity (SS) Borehole Corr [RWD] Neutron Porosity Ratio Borehole Corr. [RWD] Phase Difference Borehole Corrected [RWD] Phase Difference Dielectric Corrected [RWD] Phase Difference Elapsed Time [RWD] Resistivity (AT) Borehole Corrected [RWD] Resistivity (AT) Corrected Dielectric Effect [RWD] Rate of Penetration Averaged Rate of Penetration Resistivity (PD) Borehole Corrected [RWD] Resistivity (PD) Corrected for Dielectric Effect [RWD] CD$ Temperature [RWD] True Vertical Depth AT is Attenuation PD is Phase Difference LS is Limestone SS is Sandstone RWD is Recorded While Drilling deg g/cc mins pts mmho/m mmho/m g/cc B/e p.u. p.u. g/cc MWD-API cps deg cps cps mins. p.u. p.u. p.u. deg deg mins ohm-m ohm-m fi/hr ft/hr ohm-m ohm-m deg F ff Copyright 1987,1988,1989,1990,1991 By WESTERN ATLAS INTERNATIONAL, INC. All rights reserved. PROGRAM: TAPESCAN REVISION: 2.64 Start of execution: Wed 6 JLY 94 1:21p ~ = -- E C H O I N G I N PARAMETERS ~ INPUT PARAMETER FILE: TAPESCAN.INP 1 2 3 4 5 6 7 123456789012345678901234567890123456789012345678901234567890123456789012 1 AUTOCURV = 0 , ! Automatic Curve renaming: 0=OFF, I=ON 2 AUTOFILE = 0 , ! Automatic FILE= generation: 0=OFF, I=ON 3 COMMENTS = I , ! Decode LIS Comment records: 0=OFF, I=ON 4 INFORECS = 1 , ! Decode LIS Information records: 0=NO,I=YES 5 LISTMETHOD = 0 , ! Listing Method: 0=depth units 1=tape units 6 LISTFREQ = 100, ! Listing Frequency: Every n units 7 LISTMAX = 0 , ! Listing Maximum (0=no limit, value=list limit) 8 STATS = 0 , ! Statistics generation: 0=OFF, 1 =ON 9 FORCETYP = 0 , ! (I=BIT,2=LIS ... thru 35=Array Accoustic) (see table) 10 WRITEASCII = 0 , ! If 1, all ascii files will be written (file0001.dat,etc.) 11 WRITETAP = 1 , ! Write Tape-Image File: 0=NO, I=YES 12 SPLITLIS = 1 , ! If 1 and WRITETAP on, split LIS logical files to physical 13 SUBFILES = /0/, ! Tape Subtile write selection (WRITETAP must be on) 14 INTERPOLATE='YES' ! Set up for TAPE2WDS to interpolate datums CYES'ofNO') 15 END ~ = = U S E R I N P U T P A R A M E -! AUTOCURV = 0 , AUTOFILE = 0 , COMMENTS = 1 , INFORECS = 1 , LISTMETHOD = 0 , LISTFREQ = 100, LISTMAX = 0, STATS = 0, FORCETYP = 0 , WRITEASCII = 0 , WRITETAP = 1 , SPLITLIS = 1 , SUBFILES = /0/, INTERPOLATE ='YES' END PROCESSING INTERVAL FROM 0.000 TO 0.000 ............. ! ~-- CONSTANT PARAMETERS ........................................... AUTOCURV= 0.000000E+00 AUTOFILE= 0.000000E+00 COMMENTS= 1.00000 FORCETYP= 0.000000E+00 INFORECS= 1.00000 LISTFREQ= 100.000 LISTMAX = 0.000000E+00 LISTMETH= 0.000000E+00 SELFTEST= 0.000000E+00 SPLITLIS= 1.00000 STATS = 0.000000E+00 WRITEASC= 0.000000E+00 WRITETAP= 1.00000 dpcoef-- 1.00000 dpcte = 1.00000 drlength-- 0.000000E+00 listwave= 0.000000E+00 maxrecln= 0.000000E+00 minrecln= 0.000000E+00 nsamples= 0.000000E+00 numcurvs= 0.000000E+00 numdatar-- 0.000000E+00 numrecfl= 0.000000E+00 ffendep = 0.000000E+00 tflevsp = 0.000000E+00 tfstdep = 0.000000E+00 wcrbot = 0.000000E+00 wcrlevsp= 0.000000E+00 wcrtop = 0.000000E+00 ~-- ARRAY PARAMETERS ............................................. SUBFILES( 1) = 0.000000E+00 SUBFILES(3) =-9999.00 SUBFILES(5) =-9999.00 SUBFILES(7) =-9999.00 SUBFILES(9) =-9999.00 SUBFILES(11) = -9999.00 SUBFILES(13) -- -9999.00 SUBFILES(15) = -9999.00 SUBFILES(17) = -9999.00 SUBFILES(19) = -9999.00 SUBFILES(21) = -9999.00 SUBFILES(23) = -9999.00 SUBFILES(25) = -9999.00 SUBFILES(27) = -9999.00 SUBFILES(29) = -9999.00 SUBFILES(31) = -9999.00 SUBFILES(33) = -9999.00 SUBFILES(35) = -9999.00 SUBFILES(37) = -9999.00 SUBFILES(39) = -9999.00 SUBFILES(41) = -9999.00 SUBFILES(43) = -9999.00 SUBFILES(45) = -9999.00 SUBFILES(47) = -9999.00 SUBFILES(49) = -9999.00 SUBFILES(51) = -9999.00 SUBFILES(53) = -9999.00 SUBFILES(55) = -9999.00 SUBFILES(57) = -9999.00 SUBFILES(59) = -9999.00 SUBFILES(61) = -9999.00 SUBFILES(63) = -9999.00 SUBFILES(65) = -9999.00 SUBFILES(67) = -9999.00 SUBFILES(69) = -9999.00 SUBFILES(71) = -9999.00 SUBFILES(73) = -9999.00 SUBFILES(75) = -9999.00 SUBFILES(77) = -9999.00 SUBFILES(79) = -9999.00 SUBFILES(81) = -9999.00 SUBFILES(83) = -9999.00 SUBFILES(85) = -9999.00 SUBFILES(87) = -9999.00 SUBFILES(89) = -9999.00 SUBFILES(2) =-9999.00 SUBFILES(4) =-9999.00 SUBFILES(6)---9999.00 SUBFILES(8) =-9999.00 SUBFILES(10) = -9999.00 SUBFILES(12) = -9999.00 SUBFILES(14) = -9999.00 SUBFILES(16) =-9999.00 SUBFILES(18) = -9999.00 SUBFILES(20) = -9999.00 SUBFILES(22) = -9999.00 SUBFILES(24) = -9999.00 SUBFILES(26) = -9999.00 SUBFILES(28) = -9999.00 SUBFILES(30) = -9999.00 SUBFILES(32) = -9999.00 SUBFILES(34) = -9999.00 SUBFILES(36) = -9999.00 SUBFILES(38) = -9999.00 SUBFILES(40) = -9999.00 SUBFILES(42) = -9999.00 SUBFILES(44) = -9999.00 SUBFILES(46) = -9999.00 SUBFILES(48) = -9999.00 SUBFILES(50) = -9999.00 SUBFILES(52) = -9999.00 SUBFILES(54) = -9999.00 SUBFILES(56) = -9999.00 SUBFILES(58) = -9999.00 SUBFILES(60) = -9999.00 SUBFILES(62) = -9999.00 SUBFILES(64) = -9999.00 SUBFILES(66) = -9999.00 SUBFILES(68) = -9999.00 SUBFILES(70) = -9999.00 SUBFILES(72) = -9999.00 SUBFILES(74) = -9999.00 SUBFILES(76) = -9999.00 SUBFILES(78) = -9999.00 SUBFILES(80) = -9999.00 SUBFILES(82) = -9999.00 SUBFILES(84) = -9999.00 SUBFILES(86) = -9999.00 SUBFILES(88) = -9999.00 SUBFILES(90) = -9999.00 SUBFILES(91) -- -9999.00 SUBFILES(93) = -9999.00 SUBFILES(95) = -9999.00 SUBFILES(97) : -9999.00 SUBFILES(99) = -9999.00 SUBFILES(101) = -9999.00 SUBFILES(103) = -9999.00 SUBFILES(105) = -9999.00 S U B FILE S (107) = -9999. O0 SUBFILES(109) = -9999.00 SUBFILES(111) = -9999.00 SUBFILES(113) = -9999.00 SUBFILES(115) = -9999.00 SUBFILES(117) = -9999.00 SUBFILES(119) = -9999.00 SUBFILES(121) -- -9999.00 SUBFILES(123) = -9999.00 SUBFILES(125) = -9999.00 SUBFILES(127) = -9999.00 SUBFILES(92) = -9999.00 SUBFILES(94): -9999.00 SUBFILES(96) = -9999.00 SUBFILES(98) = -9999.00 SUBFILES(IO0) -- -9999.00 SUBFILES(102) -- -9999.00 SUBFILES(104) = -9999.00 SUBFILES(106) -- -9999.00 SUBFI LES (108) -- -9999.00 SUBFILES(110) = -9999.00 SUBFILES(112) = -9999.00 SUBFILES(114) = -9999.00 SUBFILES(116) -- -9999.00 SUBFILES(118) -- -9999.00 SUBFILES(120) -- -9999.00 SUBFILES(122) = -9999.00 SUBFILES(124) = -9999.00 SUBFILES(126) = -9999.00 SUBFILES (128) -- -9999.00 i__ STRING PARAMETERS ............................................. INTERPOL-- YES Input Tape Device, LU (1) is: TAPEC: Output Tape-Image file, LU (2) is: J:\1210\1210.TAP (Output Tape-Image file will be created) Listing Method ("LISTMETH") = 0, Depth Unit oriented listing. Listing Frequency ("LISTFREQ") is every ( 100) units of Depth. Listing output limiting (LISTMAX) not enabled... (to enable list limiting set LISTMAX positive) Data Statistics reporting ("STATS") has not been enabled. (Specify STATS = 1 to enable this feature) Automatic curve renaming has been disabled by user input (AUTOCURV=0). Automatic "FILE=n" card generation is disabled. (This is the program default, AUTOFILE--0) (Specify AUTOFILE--1 to enable this feature) LIS comment record decoding (COMMENTS= 1) has been enabled by user input. LIS information record decoding (INFORECS= 1) has been enabled by user input. The WRITEASC option has not been enabled... (to write ASCII subfiles specify WRITEASC=I) Tape Subtile 1 is type: LIS **** REEL HEADER **** MWD 94/7/6 1210 01 **** TAPE HEADER **** MWD 93/8/27 1210 01 Tape Subtile: 1 Minimum record length: Maximum record length: 2 records... 132 bytes 132 bytes Tape Subtile 2 is type: LIS LIS COMMENT RECORD(s): 12345678901234567890123456789012345678901234567890123456789012345678901234567890 TAPE HEADER PRUDHOE BAY UNIT MWD/MAD LOGS WELL NAME: APl NUMBER: OPERATOR: LOGGING COMPANY: TAPE CREATION DATE: JOB DATA BIT RUN1 JOB NUMBER: 1210 LOGGING ENGINEER: OPERATOR WITNESS: SURFACE LOCATION SECTION: TOWNSHIP: RANGE: FNL: FSL: FEL: FWL: ELEVATION(FT FROM MSL 0) KELLY BUSHING: DERRICK FLOOR: GROUND LEVEL: WELL CASING RECORD L-13 50-029-22335 Conoco Inc. BAKER HUGHES INTEQ 30 AUG 93 BIT RUN2 BIT RUN3 1210 J. BURTON S.BURKHARDT D. MOUNTJOY J. POLYA 51.00 50.00 17.70 8 13N 10E 1916 136 OPEN HOLE CASING DRILLERS BIT SIZE (IN) SIZE (IN) DEPTH (FT) 1ST STRING 24.000 13.375 110.0 2ND STRING 12.250 9.625 6086.0 3RD STRING 8.500 PRODUCTION STRING REMARKS: $ **** FILE HEADER **** MWD .001 1024 LIS COMMENT RECORD(s): 12345678901234567890123456789012345678901234567890123456789012345678901234567890 FILE HEADER FILE NUMBER: 1 EDITED MERGED MWD Depth shifted and clipped curves; all bit runs merged. DEPTH INCREMENT: 0.5000 FILE SUMMARY PBU TOOL CODE START DEPTH STOP DEPTH MWD 5971.0 11017.0 $ BASELINE CURVE FOR SHIFTS: CURVE SHIFT DATA (MEASURED DEPTH) ......... EQUIVALENT UNSHIFTED DEPTH ......... BASELINE DEPTH $ MERGED DATA SOURCE PBU TOOL CODE BIT RUN NO MERGE TOP MWD 3 5971.0 6147.0 MWD 3 6147.0 11017.0 $ # REMARKS: $ CN WN FN COUN STAT MERGE BASE NO DEPTH SHIFTING PERFORMED ON THIS TAPE. : Conoco Inc. : L-13 : Milne Point Unit : North Slope :Alaska LIS COMMENT RECORD(s): 12345678901234567890123456789012345678901234567890123456789012345678901234567890 THIS FILE CONTAINS EDITED MERGED MWD DATA. * FORMAT RECORD (TYPE# 64) Entry Type(4) Size(1) Repcode(66) Logging direction is down (value= 255) Entry Type(12) Size(4) Repcode(68) Null data value is: -999.250000 Entry Type(16) Size(1) Repcode(66) Datum Specification Block Sub-type is: Entry Block terminator. Summary of entry types encountered: 1 2 3 4 5 6 7 8 91011 1213141516 000 1 0000000 1 000 1 Rep Code Count Bytes 68 11 44 Sum: 11 44 44 fndun a [F ] 1.00000000 ONE DEPTH PER FRAME Tape depth ID: F 11 Curves: APl APl APl APl Log Crv Crv Name Tool Code Samples Units Size Length Typ Typ CIs Mod 1 RHOBMWD 68 1 G/CC 4 4 98 660 71 6 2 PEF MWD 68 1 BN/E 4 4 98 660 71 6 3 DRHOMWD 68 1 G/CC 4 4 98 660 71 6 4 GR MWD 68 1 GAPI 4 4 98 660 71 6 5 FCNTMWD 68 1 CPS 4 4 98 660 71 6 6 NCNTMWD 68 1 CPS 4 4 98 660 71 6 7 NPHIMWD 68 1 PU-S 4 4 98 660 71 6 8 NRAT MWD 68 1 RATI 4 9 RA MWD 68 1 OHMM 4 10 ROP MWD 68 1 FPHR 4 11 RP MWD 68 1 OHMM 4 44 4 98 66O 71 64 98 660 71 6 4 98 660 71 6 4 98 66O 71 6 ** Routine LEVONE detects data discrepancy: DSB indicates: 1 FRAMES Data Record Length indicates: 21 FRAMES * DATA RECORD (TYPE# 0) 1014 BYTES * Total Data Records: 481 Tape File Start Depth -- 5971.000000 Tape File End Depth = 11017.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 15935 datums Tape Subtile: 2 551 records... Minimum record length: 62 bytes Maximum record length: 1014 bytes Tape Subtile 3 is type: LIS **** FILE HEADER **** MWD .OO2 1024 LIS COMMENT RECORD(s): 12345678901234567890123456789012345678901234567890123456789012345678901234567890 FILE HEADER FILE NUMBER: 2 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NO: 3 DEPTH INCREMENT: 0.2500 # FILE SUMMARY VENDOR TOOL CODE START DEPTH MWD 5971.0 6147.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT): TOP LOG INTERVAL (FT): BO'FI'OM LOG INTERVAL (FT): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE MWD NEUTRON/DENSITY $ STOP DEPTH 3O APR 93 M1.33 M1.33 MEMORY 0.0 5971.0 6147.0 0 50.1 50.2 TOOL NUMBER 2501-30 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): 8.500 DRILLER'S CASING DEPTH (FT): 0.0 BOREHOLE CONDITIONS MUD TYPE: LSND MUD DENSITY (LB/G): 9.20 MUD VISCOSITY (S): 34.0 MUD PH: 11.8 MUD CHLORIDES (PPM): 1200 FLUID LOSS (C3): 0.0 RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): 0.000 0.0 MUD AT MAX CIRCULATING TEMPERATURE: 0.000 MUD FILTRATE AT MT: 0.000 0.0 MUD CAKE AT MT: 0.000 0.0 NEUTRON TOOL MATRIX: SANDSTONE MATRIX DENSITY: 2.65 HOLE CORRECTION (IN): 8.500 TOOL STANDOFF (IN): EWR FREQUENCY (HZ): 0.0 0 REMARKS: INTERVAL FROM 6086 TO 6095 FT (4409 TO 4415 FT TVD) WAS LOGGED 118 HOURS AFTER BEING DRILLED DUE TO CASING RUN AND CEMENTING. THIS HOLE SECTION IS ALSO 12 1/4 INCH HOLE. ANY DATA PRESENTED ABOVE 6086 FT WAS LOGGED THROUGH CASING. $ CN : Conoco Inc. WN : L-13 FN : Milne Point Unit COUN : North Slope STAT :Alaska LIS COMMENT RECORD(s)' 12345678901234567890123456789012345678901234567890123456789012345678901234567890 THIS FILE CONTAINS RAW MWD DATA FROM BIT RUN 3. * FORMAT RECORD (TYPE# 64) Entry Type(4) Size(1) Repcode(66) Logging direction is down (value= 255) Entry Type(12) Size(4) Repcode(68) Null data value is: -999.250000 Entry Type(16) Size(1) Repcode(66) Datum Specification Block Sub-type is: Entry Block terminator. Summary of entry types encountered: 1 2 3 4 5 6 7 8 91011 1213141516 000 1 0000000 1 000 1 Rep Code Count Bytes 68 32 128 Sum: 32 128 128 fndun a [F ] 1.00000000 ONE DEPTH PER FRAME Tape depth ID: F 32 Curves: APl APl APl APl Log Crv Crv Name Tool Code Samples Units Size Length Typ Typ CIs Mod 1 AZT MWD 68 1 DEG 4 2 BDCM MWD 68 1 G/CC 4 3 BDEM MWD 68 1 MINS 4 4 BDIM MWD 68 1 PTS 4 5 CADE MWD 68 1 MMHO 4 6 CPDE MWD 68 1 MMHO 4 7 DCCM MWD 68 1 4 8 DLAM MWD 68 1 G/CC 4 9 DPEM MWD 68 1 MINS 4 10 DPLM MWD 68 1 PU 4 11 DPSMMWD 68 1 PU 4 12 DRHM MWD 68 1 G/CC 4 13 GRAM MWD 68 1 GAPI 4 14 GRCM MWD 68 1 GAPI 4 15 INC MWD 68 1 DEG 4 16 NFBM MWD 68 1 CPS 4 17 NNBM MWD 68 1 CPS 4 18 NPEM MWD 68 1 MINS 4 19 NPLMMWD 68 1 PU 4 20 NPSM MWD 68 1 PU 4 21 NRCM MWD 68 1 RATI 4 22 PDCM MWD 68 1 DEG 4 23 PDDC MWD 68 1 DEG 4 24 PDEM MWD 68 1 MINS 4 25 RACM MWD 68 1 OHMM 4 26 RADE MWD 68 1 OHMM 4 27 ROPA MWD 68 1 FPHR 4 28 ROPS MWD 68 1 FPHR 4 29 RPCM MWD 68 1 OHMM 4 30 RPDE MWD 68 1 OHMM 4 31 TCDM MWD 68 1 DEGF 4 32 TVD MWD 68 1 FT' 4 128 4 98 660 71 6 4 98 660 71 6 4 98 660 71 6 4 98 660 71 6 4 98 660 71 6 4 98 660 71 6 4 98 660 71 6 4 98 660 71 6 4 98 660 71 6 4 98 660 71 6 4 98 660 71 6 4 98 660 71 6 4 98 660 71 6 4 98 660 71 6 4 98 660 71 6 4 98 660 71 6 4 98 660 71 6 4 98 660 7'1 6 4 98 660 71 6 4 98 660 71 6 4 98 660 71 6 4 98 660 71 6 4 98 660 7'1 6 4 98 660 71 6 4 98 660 71 6 4 98 660 71 6 4 98 660 71 6 4 98 660 71 6 4 98 660 71 6 4 98 660 71 6 4 98 660 71 6 4 59 324 56 5 ** Routine LEVONE detects data discrepancy: DSB indicates: 1 FRAMES Data Record Length indicates: 7 FRAMES * DATA RECORD (TYPE# O) 930 BYTES * Total Data Records: 101 Tape File Start Depth = 5971.000000 Tape File End Depth = 6147.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units = Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 4066 datums Tape Subtile: 3 170 records... Minimum record length: 62 bytes Maximum record length: 930 bytes Tape Subtile 4 is type: LIS **** FILE HEADER **** MWD .003 1024 LIS COMMENT RECORD(s): 12345678901234567890123456789012345678901234567890123456789012345678901234567890 FILE HEADER FILE NUMBER: 3 RAW MWD Curves and log header data for each bit run in separate files. BIT RUN NO: 3 DEPTH INCREMENT: 0.2500 # FILE SUMMARY VENDOR TOOL CODE START DEPTH MWD 6147.0 11017.0 $ LOG HEADER DATA DATE LOGGED: SOFTWARE SURFACE SOFTWARE VERSION: DOWNHOLE SOFTWARE VERSION: DATA TYPE (MEMORY OR REAL-TIME): TD DRILLER (FT): TOP LOG INTERVAL (FT): BOTTOM LOG INTERVAL (~-1'): BIT ROTATING SPEED (RPM): HOLE INCLINATION (DEG) MINIMUM ANGLE: MAXIMUM ANGLE: TOOL STRING (TOP TO BOTTOM) VENDOR TOOL CODE TOOL TYPE MWD NEUTRON/DENSITY $ STOP DEPTH 03 MAY 93 M1.33 M1.33 MEMORY 0.0 6147.0 11017.0 0 50.2 52.8 TOOL NUMBER 2501-30 BOREHOLE AND CASING DATA OPEN HOLE BIT SIZE (IN): 8.500 DRILLER'S CASING DEPTH (FT)' 0.0 BOREHOLE CONDITIONS MUD TYPE: LSND MUD DENSITY (LB/G): 10.40 MUD VISCOSITY (S): 37.0 MUD PH: 9.4 MUD CHLORIDES (PPM): 13200 FLUID LOSS (C3): 0.0 RESISTIVITY (OHMM) AT TEMPERATURE (DEGF) MUD AT MEASURED TEMPERATURE (MT): 0.000 0.0 MUD AT MAX CIRCULATING TEMPERATURE: 0.000 MUD FILTRATE AT MT: 0.000 0.0 MUD CAKE AT MT: 0.000 0.0 NEUTRON TOOL MATRIX: SANDSTONE MATRIX DENSITY: 2.65 HOLE CORRECTION (IN): 8.500 TOOL STANDOFF (IN): EWR FREQUENCY (HZ): 0.0 0 REMARKS: INTERVAL FROM 6146 TO 6211 FI' (4448 TO 4490 FT TVD) WAS LOGGED 11 HOURS AFTER BEING DRILLED DUE TO A TURBINE FAILURE AND A TRIP OUT OF THE HOLE TO REPLACE SAME. INTERVAL FROM 8738 TO 8802 FT (6018 TO 6057 FT TVD) WAS LOGGED 6.5 HOURS AFTER BEING DRILLED DUE TO SHORT TRIP FOR HOLE CONDITIONING. INTERVAL FROM 10954 TO 11017 FT (7373 TO 7415 FT TVD) WAS NOT LOGGED DUE TO SENSOR OFFSET. $ CN : Conoco Inc. WN : L-13 FN : Milne Point Unit COUN : North Slope STAT :Alaska LIS COMMENT RECORD(s): 12345678901234567890123456789012345678901234567890123456789012345678901234567890 THIS FILE CONTAINS RAW MWD DATA FROM BIT RUN 3RR. * FORMAT RECORD (TYPE# 64) Entry Type(4) Size(1) Repcode(66) Logging direction is down (value= 255) Entry Type(12) Size(4) Repcode(68) Null data value is: -999.250000 Entry Type(16) Size(1) Repcode(66) Datum Specification Block Sub-type is: Entry Block terminator. Summary of entry types encountered: 1 2 3 4 5 6 7 8 910 11 12 13 14 15 16 000 1 00000001 0001 Rep Code Count Bytes 68 32 128 Sum: 32 128 128 fndun a [F ] 1.00000000 ONE DEPTH PER FRAME Tape depth ID: F 32 Curves: APl APl APl APl Log Crv Crv Name Tool Code Samples Units Size Length Typ Typ CIs Mod 1 AZT MWD 68 1 DEG 4 2 BDCM MWD 68 1 G/CC 4 3 BDEM MWD 68 1 MINS 4 4 BDIM MWD 68 1 PTS 4 5 CADE MWD 68 1 MMHO 4 6 CPDE MWD 68 1 MMHO 4 7 DCCM MWD 68 1 4 8 DLAM MWD 68 1 G/CC 4 9 DPEM MWD 68 1 MINS 4 10 DPLMMWD 68 1 PU 4 11 DPSMMWD 68 1 PU 4 12 DRHMMWD 68 1 G/CC 4 13 GRAM MWD 68 1 GAPI 4 14 GRCM MWD 68 1 GAPI 4 15 INC MWD 68 1 DEG 4 16 NFBM MWD 68 1 CPS 4 17 NNBM MWD 68 1 CPS 4 18 NPEM MWD 68 1 MINS 4 19 NPLM MWD 68 1 PU 4 20 NPSM MWD 68 1 PU 4 21 NRCM MWD 68 1 RATI 4 22 PDCM MWD 68 1 DEG 4 23 PDDC MWD 68 1 DEG 4 24 PDEM MWD 68 1 MINS 4 25 RACM MWD 68 1 OHMM 4 26 RADE MWD 68 1 OHMM 4 27 ROPA MWD 68 1 FPHR 4 28 ROPS MWD 68 1 FPHR 4 29 RPCM MWD 68 1 OHMM 4 30 RPDE MWD 68 1 OHMM 4 31 TCDM MWD 68 1 DEGF 4 32 TVD MWD 68 1 FT 4 128 4 98 660 71 6 4 98 660 71 6 4 98 660 71 6 4 98 660 71 6 4 98 660 71 6 4 98 660 71 6 4 98 660 71 6 4 98 660 71 6 4 98660 71 6 4 98 660 71 6 4 98 660 71 6 4 98 660 71 6 4 98 660 71 6 4 98 660 71 6 4 98 660 71 6 4 98 660 7'1 6 4 98 660 71 6 4 98 660 71 6 4 98 660 71 6 4 98 660 71 6 4 98 660 71 6 4 98 660 71 6 4 98 660 71 6 4 98 660 71 6 4 98 660 71 6 4 98 660 71 6 4 98 660 71 6 4 98 660 71 6 4 98 660 71 6 4 98 660 71 6 4 98 660 71 6 4 59 324 56 5 ** Routine LEVONE detects data discrepancy: DSB indicates: 1 FRAMES Data Record Length indicates: 7 FRAMES * DATA RECORD CI'YPE# O) 930 BYTES * Total Data Records: 2783 Tape File Start Depth = 6147.000000 Tape File End Depth = 11017.000000 Tape File Level Spacing = 0.250000 Tape File Depth Units -- Feet **** FILE TRAILER **** LIS representation code decoding summary: Rep Code: 68 125881 datums Tape Subtile: 4 2857 records... Minimum record length: 62 bytes Maximum record length: 930 bytes Tape Subtile 5 is type: LIS **** TAPE TRAILER **** MWD 93/8/27 1210 01 **** REEL TRAILER **** MWD 94/7/6 1210 01 Tape Subtile: 5 2 records... Minimum record length: 132 bytes Maximum record length: 132 bytes End of execution: Wed 6 JLY 94 1:24p Elapsed execution time = 2 minutes, 51.0 seconds. SYSTEM RETURN CODE = 0 Tape Subtile 1 is type: LIS Tape Subtile 2 is type: LIS DEPTH RHOB FCNT NCNT ROP RP 5971.0000 1.9279 12.4135 6176.6924 -999.2500 -999.2500 5971.5000 1.9318 12.5469 6189.0000 -999.2500 -999.2500 6000.0000 1.8527 17.9248 6539.7969 ~999.2500 -999.2500 6100.0000 2.2761 20.3123 6919.9707 183.0334 -999.2500 6200.0000 2.2048 19.2773 6669.5117 194.8559 2.4331 6300.0000 2.2264 23.7815 7068.9951 204.7321 3.8785 6400.0000 2.3410 23.7972 6920.4766 131.2549 2.4203 6500.0000 2.3224 21.2634 6981.2920 126.0112 2.9666 6600.0000 2.2779 24.1191 6995.3730 244.0445 3.1438 6700.0000 2.2932 28.6413 7112.4443 236.2452 3.1838 6800.0000 2.3010 23.5041 7093.9316 136.3033 2.9005 6900.0000 2.3409 26.3286 7110.0586 111.1863 3.0603 7000.0000 2.3385 25.2173 7011.8516 190.0600 3.2756 PEF NPHI 14.1445 87.6487 14.2930 86.0350 13.9181 53.4383 3.0282 48.0348 3.5486 49.5491 3.7270 40.3659 3.4123 39.3424 3.2158 46.0880 3.2562 39.1014 3.0098 32.1963 3.1763 41.1788 3.8149 35.7215 3.2542 37.3386 DRHO NRAT -0.6427 454.8731 -0.6402 45O.3555 -0.7794 333.1046 0.0647 308.9242 0.1132 315.8778 0.0071 271.3869 0.0658 265.9151 0.0289 299.7686 0.0614 264.8012 0.0169 226.7238 0.0272 275.5589 0.0732 246.6007 0.0690 253.8660 GR RA 55.6275 -999.2500 57.2549 -999.2500 60.0569 -999.2500 80.6023 -999.2500 97.1911 2.4532 97.5795 3.6027 104.0747 2.3552 106.3753 2.9636 81.1579 3.3620 106.1333 3.6116 94.9654 2.7765 103.1074 3.1246 98.7327 3.3520 DEPTH FCNT ROP 7100.0000 24.0699 153.9565 7200.0000 22.9389 192.7426 7300.0000 27.8713 126.1802 7400.0000 27.7562 74.4708 7500.0000 26.0310 33.4329 7600.0000 27.2115 165.3716 7700.0000 29.2477 126.8762 7800.0000 25.2190 95.7027 7900.0000 26.8438 118.1226 8000.0000 28.6032 168.7564 8100.0000 25.5799 141.7553 8200.0000 25.1991 153.5491 8300.0000 31.1206 91.5527 8400.0000 31.3125 196.8824 RHOB NCNT RP 2.3269 7139.4199 2.9940 2.3223 6944.9023 2.8880 2.3247 7110.7734 2.6518 2.3898 6983.4502 2.6758 2.3661 7111.9629 2.3544 2.3558 7083.0439 2.4207 2.3406 7192.7822 2.3238 2.4013 7135.3359 2.7O53 2.3942 7114.3398 2.6674 2.3667 7182.6885 2.67O0 2.3667 7122.7510 2.6605 2.3586 7246.7627 2.9119 2.3132 7210.2734 3.5292 2.3385 7282.00OO 2.8379 PEF NPHI 3.0554 4O.6OOO 3.1071 41.9061 2.9738 33.5062 3.6903 32.9340 3.6409 36.5112 3.1702 34.3521 3.1524 32.0235 3.3070 38.2648 3.4088 35.1504 3.1724 32.8557 3.3028 37.4064 3.0925 39.0069 3.1251 29.7858 3.0036 29.9208 DRHO NRAT 0.0554 270.8O66 0.0324 277.1318 0.0114 232.9328 0.0718 229.7105 0.0631 249.4420 0.0400 237.6504 0.0192 224.5308 0.0662 258.6433 0.0505 242.0330 0.0249 229.2677 0.0410 254.2263 0.0258 262.6161 0.0522 211.5314 0.0265 212.3262 GR RA 97.3619 3.2747 97.0342 3.0225 83.5601 2.7244 107.3752 2.7316 101.5611 2.3317 102.5828 2.6123 103.0102 2.4652 111.8572 2.7468 104.9530 2.7878 105.5511 2.8295 118.6035 2.7074 103.8514 3.0752 93.0676 3.7480 109.2260 3.0862 DEPTH FCNT ROP 8500.0000 28.9064 148.9417 RHOB NCNT RP 2.3839 7320.OO20 2.5888 PEF NPHI 3.1296 33.2223 DRHO NRAT 0.0357 231.3094 GR RA 102.7681 2.7103 8600.0000 33.7377 192.5908 2.3744 7328.9854 3.1980 3.2711 27.5821 0.0550 198.3563 100.1055 3.5089 8700.0000 30.3184 215.2486 2.3562 7288.7109 2.9570 3.0334 31.1480 0.0284 219.4904 102.2659 3.1035 8800.0000 27.5446 182.5812 8900.0000 32.0939 126.4643 9000.000O 31.7655 146.4843 2.3765 7016.6279 2.9791 2.3793 7337.2314 2.6818 2.4601 7232.8340 3.7451 3.0632 33.4424 2.9359 29.3117 3.5602 29.1696 0.0870 232.5749 0.0133 208.7281 0.0510 2O7.8849 105.9996 3.1549 98.4948 2.8623 143.7015 4.0237 9100.0000 34.6784 122.1034 2.4305 7304.9990 3.1049 3.4229 26.6602 0.0351 192.4859 119.8867 3.1782 9200.0000 31.5976 102.3660 2.4603 7216.7939 3.3713 3.7312 29.3234 0.0626 208.5280 104.7512 3.7712 9300.0000 31.2414 147.6618 9400.0000 32.3752 184.5472 9500.0000 29.2462 114.2258 9600.0000 29.3309 166.4595 2.4372 7313.5547 3.1475 2.4867 7280.9990 3.1366 2.4423 7278.2402 2.9262 2.4450 7245.8711 3.4591 3.3800 30.2081 3.4872 28.8437 3.4190 32.5492 3.3277 32.2561 0.0236 213.7315 0.0685 205.6208 0.0495 227.2103 0.0051 225.5462 105.9313 3.4868 119.4044 3.3434 114.0318 3.1578 136.3181 3.5965 9700.0000 30.0977 155.8271 2.4026 7266.9443 2.8178 3.2116 31.3942 0.0422 220.5775 115.8935 3.2647 9800.0000 32.8110 104.6317 2.4561 7282.8789 3.1539 3.4782 28.3361 O.O344 2O2.6534 125.6024 3.4595 DEPTH FCNT ROP 9900.0000 29.9152 180.0160 10000.0000 30.8982 68.5132 10100.0000 31.0840 210.0186 1020O.0000 19.4064 118.1432 10300.0000 29.2548 64.2475 10400.O000 25.6750 59.0198 10500.0000 32.2219 81.5600 10600.0000 34.8472 78.7530 10700.0000 29.9562 34.0758 10800.0000 23.5504 44.2985 10900.0000 30.9042 80.1954 1100O.000O -999.2500 19.5587 11017.0000 -999.2500 26.9583 RHOB NCNT RP 2.4790 7225.2197 2.6163 2.4473 7229.1016 2.8935 2.4654 7225.8750 2.9528 2.3309 6812.6934 1.5638 2.5411 7097.8809 2.6253 2.3477 7116.7217 3.2339 2.4033 7353.2656 6.5031 2.2684 7279.8516 21.0179 2.1132 7241.7217 33.8200 2.3897 6987.9521 2.8917 2.4972 7221.8770 3.0665 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 PEF NPHI 3.4977 31.3764 3.2004 30.1874 3.1562 29.9532 3.9384 52.2891 4.3813 31.9526 3.9520 37.8098 4.0548 29.6447 2.7260 26.6603 3.7580 31.8098 4.3407 41.3549 3.4885 30.5134 -999.2500 -999.2500 -999.2500 -999.2500 DRHO NRAT 0.0570 220.5108 0.0494 213.6104 0.0251 212.2388 0.0800 320.5123 0.1523 221.5145 0.0700 253.0696 0.0855 208.3531 0.0169 190.7331 O.0738 220.7122 0.0112 270.9086 0.0361 213.3553 -999.2500 -999.2500 -999.2500 -999.2500 GR RA 134.4884 2.9151 119.1659 3.2825 120.2579 3.2771 130.5455 1.5587 143.4573 3.0862 138.2706 3.2659 89.2354 8.3542 42.6850 25.7994 49.1657 55.5103 119.7690 3.1365 115.8298 3.5242 -999.2500 -999.2500 -999.2500 -999.2500 Tape File Start Depth = 5971.000000 Tape File End Depth = 11017.000000 Tape File Level Spacing = 0.500000 Tape File Depth Units = Feet Tape Subtile 3 is type: LIS DEPTH AZT BDCM BDEM BDIM CADE CPDE DCCM DLAM DPEM DPLM DPSM DRHM GRAM GRCM INC NFBM NNBM NPEM NPLM NPSM NRCM PDCM PDDC PDEM RACM RADE ROPA ROPS RPCM RPDE TCDM TVD 5971.0000 323.6449 1.9279 -999.2500 -999.2500 -999.2500 45.7411 43.7632 -0.6427 50.5419 12.4135 6176.6924 87.6487 454.8731 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 4336.0283 -999.2500 2.5705 -999.2500 18.9231 -999.2500 -999.2500 5.1818 14.1445 -999.2500 86.1445 -999.2500 -999.2500 6100.0000 324.8256 2.2761 201.0506 199.6667 -999.2500 -999.2500 153.2342 2.2113 3.0282 25.3785 22.6594 0.0647 80.6023 84.2977 50.4000 20.3123 6919.9707 209.0000 44.0956 48.0348 308.9242 -999.2500 -999.2500 180.2000 2.5731 -999.2500 151.5168 183.0334 2.1631 -999.2500 76.3742 4418.4072 6147.0000 325.0760 2.1464 738.3152 234.5001 408.8281 397.4678 144.7733 2.0483 3.5075 32.9615 30.5237 0.0981 85.6128 89.5379 50.6479 19.7143 6762.0244 738.0000 46.4262 50.2603 317.1058 15.8966 15.5949 400.6333 2.5703 2.4460 35.0096 40.5745 2.4360 2.5159 83.5531 4448.2061 Tape File Start Depth = 5971.000000 Tape File End Depth = 6147.000000 Tape File Level Spacing -- 0.250000 Tape File Depth Units = Feet 6000.0000 323.5773 1,8527 -999.2500 21.0000 -999.2500 -999.2500 -999.2500 2.6236 13.9181 50.6306 48.3202 -0.7794 60.0569 62.8104 50.4000 17.9248 6539.7969 35.0000 49.5879 53.4383 333.1046 -999.2500 -999.2500 -999.2500 0.0835 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 4354.6621 5971.2500 323.6431 1.9298 -999.2500 5.2727 -999.2500 -999.2500 -999.2500 2.5712 14.2187 45.6256 43.6469 -0.6414 55.6275 58.1779 50.5403 12.5469 6189.0000 19.0000 84.2978 86.0350 450.3555 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 4336.1885 Tape Subtile 4 is type: LIS DEPTH AZT BDCM BDEM BDIM CADE CPDE DCCM DLAM DPEM DPLM DPSM DRHM GRAM GRCM INC NFBM NNBM NPEM NPLM NPSM NRCM PDCM PDDC PDEM RACM RADE ROPA ROPS RPCM RPDE TCDM TVD 6147.0000 325.0760 2.1464 738.3152 234.5001 408.8281 397.4678 144.7733 2.0483 3.5075 32.9615 30.5237 0.0981 85.6128 89.5379 50.6479 19.7143 6762.0244 738.0000 46.4262 50.2603 317.1058 15.8966 15.5949 400.6333 2.5703 2.4460 35.0096 40.5745 2.4360 2.5159 83.5531 4448.2061 6147.2500 325.0742 2.1466 737.9253 234.5834 384.8010 402.8488 145.7104 2.0458 3.5301 32.9452 30.5068 0.1008 83.3700 87.1924 50.6516 18.6534 6789.4209 738.0000 50.5484 54.3197 335.4393 16.0256 15.7211 483.9458 2.7417 2.5987 35.0096 36.8646 2.4033 2.4823 83.7500 4448.3633 6200.0000 324.6896 2.2048 702.1410 267.5000 407.6370 411.0065 147.0731 2.0913 3.5486 29.5578 26.9842 0.1132 97.1911 101.6472 51.4208 19.2773 6669.5117 704.0000 45.6279 49.5491 315.8778 16.2131 15.9109 696.9165 2.5804 2.4532 193.1528 194.8559 2.3569 2.4331 86.9643 4481.4873 6300.0000 324.1817 2.2264 33.6980 330.9999 277.5681 257.8330 118.1906 2.2151 3.7270 28.5241 25.6703 0.0071 97.5795 102.0533 52.0387 23.7815 7068.9951 35.0000 36.4150 40.3659 271.3869 12.2413 11.9579 29.0944 3.8423 3.6027 201.7885 204.7321 3.7344 3.8785 82.3250 4543.4238 6400.0000 324.4375 2.3410 45.3622 401.1667 424.5858 413.1649 147.4562 2.2752 3.4123 21.5776 18.7258 0.0658 104.0747 108.8463 52.3531 23.7972 6920.4766 47.0000 35.4041 39.3424 265.9151 16.2657 15.9608 39.3333 2.4718 2.3552 131.0611 131.2549 2.3441 2.4203 86.2250 4604.7246 6500.0000 323.8866 2.3224 45.4106 488.1819 337.4269 337.0913 133.9722 2.2936 3.2158 22.6625 19.8545 0.0289 106.3753 111.2524 52.5753 21.2634 6981.2920 46.0000 42.1334 46.0880 299.7686 14.4111 14.1161 39.5249 3.1389 2.9636 117.6685 126.0112 2.8665 2.9666 88.7844 4665.6523 DEPTH CADE DPLM INC NPSM RACM RPDE 6600.O000 297.4378 25.2018 52.4108 39.1014 3.5879 3.1438 6700.0000 276.8887 24.3571 52.4990 32.1963 3.8749 3.1838 6800.0000 360.1670 23.8963 52.6063 41.1788 2.9299 2.9005 6900.0000 320.0427 21.6199 52.7115 35.7215 3.3193 3.0603 7000.0000 298.3295 21.5888 52.7840 37.3386 3.5718 3.2756 7100.0000 305.3679 22.1243 52.6777 40.6000 3.4928 2.9940 AZT CPDE DPSM NFBM NRCM RADE TCDM 323.8000 318.0828 22.5516 24.1191 264.8012 3.3620 92.0750 323.8000 314.0883 21.6271 28.6413 226.7238 3.6116 95.2089 323.2042 344.7669 21.1493 23.5041 275.5589 2.7765 98.0375 320.3000 326.7681 18.7309 26.3286 246.6OO7 3.1246 101.0750 320.1245 305.2917 18.8814 25.2173 253.8660 3.3520 104.5625 319.2000 333.9966 19.5837 24.0699 270.8066 3.2747 107.4875 BDCM DCCM DRHM NNBM PDCM ROPA 'T'VD 2.2779 130.3857 0.0614 6995.3730 13.9174 230.7017 4726.5293 2.2932 129.6174 0.0169 7112.4443 13.8119 228.4351 4787.4707 2.3010 135.4035 0.0272 7093.9316 14.6080 142.9232 4848.2715 2.3409 132.0477 0.0732 7110.0586 14.1468 108.4194 4908.9326 2.3385 127.9104 0.0690 7011.8516 13.5770 196.2379 4969.4629 2.3269 133.4099 0.0554 7139.4199 14.3334 148.1640 5030.0215 BDEM DLAM GRAM NPEM PDDC ROPS 46.1720 2.2177 81.1579 48.0000 13.6235 244.0445 47.4251 2.2766 106.1333 49.0000 13.5182 236.2452 68.8826 2.2742 94.9654 76.0000 14.3107 136.3033 57.1997 2.2671 103.1074 58.6667 13.8503 111.1863 41.5511 2.2718 98.7327 46.0000 13.2838 190.0600 39.9398 2.2763 97.3619 42.0000 14.0368 153.9565 BDIM DPEM GRCM NPLM PDEM RPCM 554.8334 3.2562 84.8788 35.1610 41.2833 3.0349 630.2501 3.0098 110.9993 28.3736 41.6611 3.0730 722.0000 3.1763 99.3194 37.2229 56.2943 2.8032 837.1667 3.8149 107.8347 31.8265 49.7333 2.9551 939.5000 3.2542 105.4786 33.4186 28.40O0 3.1600 1053.7500 3.0554 104.0141 36.6474 28.9167 2.8920 DEPTH CADE DPLM INC NPSM RACM RPDE 7200.0000 330.8562 22.7226 52.6000 41.9061 3.2079 2.8880 7300.0000 367.0483 22.8279 52.6333 33.5062 2.8780 2.6518 74OO.OOOO 366.0923 18.7320 52.6630 32.934O 2.8851 2.6758 7500.0000 428.8640 2O.OO4O 52.6000 36.5112 2.4471 2.3544 7600.0000 382.8047 20.7249 52.6000 34.3521 2.7578 2.4207 7700.0000 405.6478 21.5675 52.5458 32.0235 2.5965 2.3238 AZT CPDE DPSM NFBM NRCM RADE TCDM 319.3149 346.2631 19.8620 22.9389 277.1318 3.O225 109.1750 319.4667 377.1060 19.7139 27.8713 232.9328 2.7244 110.6375 318.6826 373.7256 15.7688 27.7562 229.7105 2.7316 112.5500 317.4937 424.73O2 17.2075 26.0310 249.4420 2.3317 115.0250 317.1000 413.0986 17.8286 27.2115 237.65O4 2.6123 115.9250 316.7208 430.3246 18.7488 29.2477 224.5308 2.4652 117.9500 BDCM DCCM DRHM NNBM PDCM ROPA TVD 2.3223 135.6728 0.0324 6944.9023 14.6448 178.1978 5090.7090 2.3247 141.2419 0.0114 7110.7734 15.4109 134.7157 5151.4238 2.3898 140.6403 0.0718 6983.4502 15.3254 89.4258 5212.0928 2.3661 149.3853 0.0631 7111.9629 16.5284 63.7163 5272.7910 2.3558 147.4576 O.O4OO 7083.0439 16.2632 159.2104 5333.5293 2.3406 150.3350 0.0192 7192.7822 16.6591 113.6029 5394.3027 BDEM DLAM GRAM NPEM PDDC ROPS 31.0716 2.2890 97.0342 54.0000 14.3484 192.7426 64.6834 2.3083 83.5601 67.0000 15.1094 126.1802 62.3566 2.3179 107.3752 65.0000 15.0265 74.4708 83.4162 2.3048 101.5611 86.0000 16.2249 33.4329 65.2914 2.3156 102.5828 68.0000 15.9582 165.3716 63.2675 2.322O 103.0102 66.0000 16.3518 126.8762 BDIM DPEM GRCM NPLM PDEM RPCM 1132.8574 3.1071 103.6641 37.9543 26.O333 2.7915 1237.5002 2.9738 89.2693 29.6535 34.25OO 2.5654 1356.7500 3.6903 114.7115 29.0940 38.6333 2.5885 1504.7498 3.6409 108.5002 32.6032 53.5333 2.2812 1621.0000 3.1702 109.5918 30.4819 55.0083 2.3441 1742.2498 3.1524 11 O.O483 28.2050 50.8167 2.2512 DEPTH CADE DPLM INC NPSM RACM RPDE 7800.0000 364.0633 17.7965 52.5589 38.2648 2.9014 2.7053 7900.0000 358.7077 18.4526 52.7887 35.1504 2.9488 2.6674 8000.0000 353.4219 20.1901 53.0376 32.8557 2.9961 2.6700 8100.0000 369.3536 20.1346 53.2479 37.4064 2.8584 2.6605 8200.000O 325.1848 2O.7436 53.3781 39.0069 3.2672 2.9119 8300.0000 266.8078 23.2069 53.7292 29.7858 4.0203 3.5292 AZT CPDE DPSM NFBM NRCM RADE TCDM 316.5768 369.6401 15.0743 25.2190 258.6433 2.7468 119.4125 316.7000 374.9003 15.5034 26.8438 242.0330 2.7878 120.2000 316.7000 374.5358 17.1690 28.6032 229.2677 2.8295 121.0813 316.4781 375.8628 17.1727 25.5799 254.2263 2.7074 122.5400 316.0875 343.4235 17.6612 25.1991 262.6161 3.0752 124.1375 315.7531 283.3472 20.4148 31.1206 211.5314 3.7480 125.8250 BDCM DCCM DRHM NNBM PDCM ROPA TVD 2.4013 139.9082 0.0662 7135.3359 15.2257 89.3466 5455.1104 2.3942 140.8716 0.0505 7114.3398 15.3572 127.5842 5515.7480 2.3667 140.7834 0.0249 7182.6885 15.3451 165.1340 5576.0547 2.3667 141.0393 0.0410 7122.7510 15.3803 130.0365 5636.0381 2.3586 135.1751 0.0258 7246.7627 14.5737 141.5042 5695.7852 2.3132 123.5307 0.0522 7210.2734 12.9720 128.5883 5755.1992 BDEM DLAM GRAM NPEM PDDC ROPS 54.3515 2.3394 111.8572 56.3333 14.9271 95.7027 45.6754 2.3440 104.9530 47,0000 15.0550 118.1226 46.2134 2.3398 105.5511 48.0000 15.0462 168.7564 59.0195 2.3247 118.6035 61.0000 15.0783 141.7553 54.5572 2.3295 103.8514 57.0000 14.2757 153.5491 64.5128 2.2610 93.0676 66.0000 12.6843 91.5527 BDIM DPEM GRCM NPLM PDEM RPCM 1839.5000 3.3070 119.4998 34.3365 47.3917 2.6170 1924.2500 3.4088 112.1238 31.2656 39.5500 2.5796 2000.5000 3.1724 112.7629 29.0175 39.4388 2.5830 2105.2500 3.3028 126.7071 33.4855 48.3661 2.5731 2199.2500 3.0925 110.9471 35.0678 45.6389 2.8131 2280.8564 3.1251 99.4265 26.0277 58.6167 3.4011 DEPTH CADE DPLM INC NPSM RACM RPDE 8400.0000 324.0228 21.7183 53.9766 29.9208 3.2823 2.8379 8500.0000 368,9626 19.0760 54.2811 33.2223 2.8639 2.5888 8600.0000 284.9857 19.6186 51.8021 27.5821 3.7555 3.1980 8700.0000 322.2139 20.6857 52.0173 31.1480 3.2987 2.9570 8800.0000 316.9634 19.4890 52.2274 33.4424 3.3558 2.9791 8900.0000 349.3708 19.3382 52.3979 29.3117 3.0342 2.6818 AZT CPDE DPSM NFBM NRCM RADE TCDM 315.9649 352.3748 18.8760 31.3125 212.3262 3.0862 125.7125 316.3747 386.2799 16.1260 28.9064 231.3094 2.7103 126.8375 315.7000 312.6990 16.7011 33.7377 198.3563 3.5089 123.3500 315.6395 338.1771 17.8071 30.3184 219.4904 3.1035 126.1625 315.1916 335.6755 16.5758 27.5446 232.5749 3.1549 127.4000 315.5695 372.8843 16.4050 32.0939 208.7281 2.8623 118.2875 BDCM DCCM DRHM NNBM PDCM ROPA 'T'VD 2.3385 136.7902 0.0265 7282.0000 14.7985 192.9397 5814.1904 2.3839 142.8373 0.0357 7320.0020 15.6303 164.4564 5872.7959 2.3744 129.3580 0.0550 7328.9854 13.7761 170.9987 5932.8271 2.3562 134.1740 0.0284 7288.7109 14.4388 208.3613 5994.5117 2.3765 133.7327 0.0870 7016.6279 14.3778 171.0634 6055.8867 2.3793 140.4799 0.0133 7337.2314 15.3062 151.3187 6117.0234 BDEM DLAM GRAM NPEM PDDC ROPS 56.0275 2.3121 109.2260 57.0000 14.5019 196.8824 144.5552 2.3481 102.7681 146.0000 15.3301 148.9417 47.2038 2.3196 100.1055 48.0000 13.4817 192.5908 48.5278 2.3278 102.2659 51.0000 14.1438 215.2486 463.3893 2.2897 105.9996 484.0000 14.0802 182.5812 44.1095 2.3660 98.4948 54.0000 15.0075 126.4643 BDIM DPEM GRCM NPLM PDEM RPCM 2354.4282 3.0036 116.6888 26.1587 50.8167 2.7438 2468.1670 3.1296 109.7897 29.3766 130.0167 2.5057 2532.4287 3.2711 106.9452 23.8934 42.0833 3.0860 2599.9995 3.0334 109.2532 27.3519 40.9944 2.8574 2695.6001 3.0632 113.2419 29.5911 453.5167 2.8773 2783.3999 2.9359 105.2245 25.5676 30.7667 2.5947 DEPTH CADE DPLM INC NPSM RACM RPDE 9000.0000 248.5294 14.3334 52.6774 29.1696 4.3343 3.7451 9100.0000 314.6467 16.3443 52.9773 26.6602 3.3779 3.1049 9200.0000 265.1669 14.6010 53.2489 29.3234 4.0539 3.3713 9300.0000 286.7935 15.9301 53.4106 30.2081 3.7312 3.1475 9400.000O 299.0971 12.9738 53.6832 28.8437 3.5668 3.1366 9500.0000 316.6780 15.6276 54.0011 32.5492 3.3635 2.9262 AZT CPDE DPSM NFBM NRCM RADE TCDM 315.3000 267.0142 11.5104 31.7655 207.8849 4.0237 122.4500 315.1670 322.0757 13.3035 34.6784 192.4859 3.1782 125.1500 315.0000 296.6201 11.4971 31.5976 208.5280 3.7712 126.7250 314.6127 317.7129 12.9000 31.2414 213.7315 3.4868 128.3675 314.3000 318.8188 9.8943 32.3752 205.6208 3.3434 129.7203 313.8308 341.7371 12.5882 29.2462 227.2103 3.1578 131.0000 BDCM DCCM DRHM NNBM PDCM ROPA TVD 2.4601 120.1387 0.0510 7232.8340 12.5087 153.9750 6177.8437 2.4305 131.1395 0.0351 7304.9990 14.0222 139.0769 6238.2627 2.4603 126.1773 0.0626 7216.7939 13.3400 127.2624 6298.2842 2.4372 130.3110 0.0236 7313.5547 13.9083 139.5068 6358.0078 2.4867 130.5295 0.0685 7280.9990 13.9383 193.5159 6417.4268 2.4423 134.8322 0.0495 7278.2402 14.5302 133.8134 6476.4326 BDEM DLAM GRAM NPEM PDDC ROPS 44.2481 2.4139 143.7015 49.0000 12.2235 146.4843 43.6349 2.3954 119.8867 45.0000 13.7291 122.1034 52.7445 2.3977 104.7512 54.0000 13.0504 102.3660 43.2486 2.4140 105.9313 45.OOOO 13.6147 147.6618 47.5168 2.4196 119.4044 49.0000 13.6437 184.5472 42.6288 2.3933 114.0318 45.0000 14.2348 114.2258 BDIM DPEM GRCM NPLM PDEM RPCM 2855.0000 3.5602 153.5199 25.4299 23.0167 3.6073 2937.4448 3.4229 128.7606 23.0041 23.3167 2.9983 3022.000O 3.7312 112.5047 25.5790 39.3186 3.2523 3096.4282 3.3800 113.7722 26.4378 35.8499 3.0386 3171.3330 3.4872 128.2425 25.1157 4O.2667 3.0279 3240.4995 3.4190 122.4723 28.7181 37.1250 2.8282 DEPTH CADE DPLM INC NPSM RACM RPDE 9600.0000 278.0491 15.5576 54.3179 32.2561 3.8472 3.4591 9700.0000 306.3072 18.0742 53.4750 31.3942 3.4881 2.8178 9800.0000 289.0602 14.9540 53.3660 28.3361 3.6999 3.1539 9900.0000 343.0439 13.5011 53.6598 31.3764 3.0951 2.6163 10000.0000 304.6494 15.3968 53.9747 30.1874 3.5056 2.8935 10100.0000 305.1440 14.3953 52.7411 29.9532 3.4973 2.9528 AZT CPDE DPSM NFBM NRCM RADE TCDM 314.1084 289.0930 12.4235 29.33O9 225.5462 3.5965 132.8000 314.3000 354.8857 14.9944 30.0977 220.5775 3.2647 131.0750 314.3000 317.0668 11.7529 32.8110 202.6534 3.4595 133.7000 313.6938 382.2222 10.3662 29.9152 220.5108 2.9151 136.1750 313.2337 345.6075 12.2852 30.8982 213.6104 3.2825 137.8062 313.8779 338.6634 11.1879 31.0840 212.2388 3.2771 136.8950 BDCM DCCM DRHM NNBM PDCM ROPA TVD 2.4450 124.6759 0.0051 7245.8711 13.1333 129.2434 6534.9893 2.4026 137.2300 0.0422 7266.9443 14.8583 145.2300 6593.8838 2.4561 130.1679 0.0344 7282.8789 13.8867 116.2574 6653.4912 2.4790 142.1193 0.0570 7225.2197 15.5307 151.4379 6712.9609 2.4473 135.5412 0.0494 7229.1016 14.6258 68.4692 6772.0059 2.4654 134.2483 0.0251 7225.8750 14.4479 180.8299 6831.6416 BDEM DLAM GRAM NPEM PDDC ROPS 60.7380 2.4388 136.3181 94.0000 12.8443 166.4595 105.6090 2.3587 115.8935 107.0000 14.5614 155.8271 51.0328 2.4199 125.6024 53.0000 13.5937 104.6317 53.8682 2.4221 134.4884 56.0000 15.2297 180.0160 129.1286 2.3973 119.1659 134.0000 14.3289 68.5132 60.3687 2.4387 120.2579 63.0000 14.1528 210.0186 BDIM DPEM GRCM NPLM PDEM RPCM 3316.7993 3.3277 146.4082 28.4320 38.1833 3.3355 3458.5708 3.2116 124.4718 27.5926 94.2389 2.7253 3537.3999 3.4782 134.8994 24.6225 43.5389 3.0456 3629.6001 3.4977 144.4431 27.5744 47.7500 2.5323 3768.3330 3.2004 127.9864 26.4177 107.0333 2.7972 3870.0000 3.1562 129.1593 26.1902 52.2167 2.8541 DEPTH CADE DPLM INO NPSM RACM RPDE 10200.0000 641.5660 22.1377 52.9947 52.2891 1.6178 1.5638 10300.0000 324.0235 9.6729 52.4621 31.9526 3.2903 2.6253 10400.0000 306.1940 21.4574 51.8421 37.8098 3.4747 3.2339 10500.0000 119.7008 17.5265 51.2500 29.6447 9.6518 6.5031 10600.0000 38.7606 25.5351 50.2021 26.6603 39.4419 21.0179 1O700.000O 18.0147 35.1038 48.8811 31.8098 -999.25OO 33.8200 AZT CPDE DPSM NFBM NRCM RADE TCDM 313.8895 639.4825 19.3406 19.4064 320.5123 1.5587 139.2125 312.8747 380.9071 6.5993 29.2548 221.5145 3.0862 143.3750 312.4653 309.2256 18.3224 25.6750 253.0696 3.2659 147.0312 311.9000 153.7722 14.9485 32.2219 208.3531 8.3542 147.2000 310.4000 47.5786 23.1281 34.8472 190.7331 25.7994 147.1625 310.2084 29.5683 32.5321 29.9562 220.7122 55.5103 150.1250 BDCM DCCM DRHM NNBM PDCM ROPA 'I'VD 2.3309 181.3945 0.0800 6812.6934 20.9268 106.7429 6892.0127 2.5411 141.8817 0.1523 7097.8809 15.4980 51.6713 6952.5879 2.3477 128.6468 0.0700 7116.7217 13.6774 57.3842 7013.9619 2.4033 93.0961 0.0855 7353.2656 8.8117 83.6724 7076.1611 2.2684 55.2649 0.0169 7279.8516 3.8721 75.1726 7139.4717 2.1132 45.2016 0.0738 7241.7217 2.6863 36.6864 7204.3945 BDEM DLAM GRAM NPEM PDDC ROPS 246.1682 2.2515 130.5455 251.0000 20.6075 118.1432 122.5675 2.3923 143.4573 128.0000 15.1981 64.2475 123.0788 2.2731 138.2706 132.0000 13.3860 59.0198 95.9430 2.3248 89.2354 103.0000 8.5548 81.5600 104.8095 2.2564 42.6850 110.0000 3.6908 78.7530 94.1370 2.0359 49.1657 112.0000 2.5376 34.0758 BDIM DPEM GRCM NPLM PDEM RPCM 4060.0000 3.9384 145.5239 48.4141 216.3333 1.5225 4294.6670 4.3813 159.9172 28.1359 104.3667 2.5412 4526.0000 3.9520 154.1354 33.8837 101.7667 3.1220 4753.0000 4.0548 99.4740 25.8907 75.3159 6.2159 4976.5000 2.7260 47.5825 23.0034 81.7823 19.6824 5214.5000 3.7580 54.8068 27.9967 77.2833 31.3765 DEPTH Az'r BDCM BDEM BDIM CADE CPDE DCCM DLAM DPEM DPLM DPSM DRHM GRAM GRCM INC NFBM NNBM NPEM NPLM NPSM NRCM PDCM PDDC PDEM RACM RADE ROPA ROPS RPCM RPDE TCDM TVD 10800.0000 309.9333 2.3897 101.9711 5427.7500 318.8255 345.8187 142.3012 2.3775 4.3407 18.7888 15.7741 0.0112 119.7690 133.5110 48.3333 23.5504 6987.9521 106.0000 37.3981 41.3549 270.9086 14.6483 14.3366 73.7667 3.3482 3.1365 41.0502 44.2985 2.5255 2.8917 151.7000 7270.5371 10900.0000 310.1625 2.4972 112.8171 5605.0000 283.7507 326.1002 131.9163 2.4467 3.4885 13.2900 9.2607 0.0361 115.8298 129.1198 48.4000 30.9042 7221.8770 119.0000 26.7346 30.5134 213.3553 14.1259 13.8324 84.6833 3.7781 3.5242 75.1573 80.1954 2.9613 3.0665 151.4750 7336.9707 11000.0000 310.1000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 48.4000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 24.8273 19.5587 -999.2500 -999.2500 151.2500 7403.3633 11017.0000 310.1000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 48.4000 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 -999.2500 26.9583 26.9583 -999.2500 -999.2500 152.1500 7414.6494 Tape File Start Depth = 6147.000000 Tape File End Depth = 11017.000000 Tape File Level Spacing -- 0.250000 Tape File Depth Units = Feet Tape Subtile 5 is type: LIS