Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAbout213-1321. Type of Request: Abandon Plug Perforations Fracture Stimulate Repair Well Operations shutdown
Suspend Perforate Other Stimulate Pull Tubing Change Approved Program
Plug for Redrill Perforate New Pool Re-enter Susp Well Alter Casing Other: ESP Swap
2. Operator Name: 4. Current Well Class: 5. Permit to Drill Number:
Exploratory Development
3. Address: Stratigraphic Service
6. API Number:
7. If perforating: 8. Well Name and Number:
What Regulation or Conservation Order governs well spacing in this pool?
Yes No
9. Property Designation (Lease Number): 10. Field:
11.
Total Depth MD (ft): Total Depth TVD (ft): Effective Depth MD: Effective Depth TVD: Junk (MD):
21,340 (main)
21,371 (L1)
Casing Collapse
Conductor NA
Surface 2,260psi
Intermediate 3,090psi
Liner (main) slotted
Liner (L1) slotted
Packers and SSSV Type: Packers and SSSV MD (ft) and TVD (ft):
12. Attachments: Proposal Summary Wellbore schematic 13. Well Class after proposed work:
Detailed Operations Program BOP Sketch Exploratory Stratigraphic Development Service
14. Estimated Date for 15. Well Status after proposed work:
Commencing Operations: OIL WINJ WDSPL Suspended
16. Verbal Approval: Date: GAS WAG GSTOR SPLUG
AOGCC Representative: GINJ Op Shutdown Abandoned
Contact Name:
Contact Email:
Contact Phone:
Authorized Title:
Conditions of approval: Notify AOGCC so that a representative may witness Sundry Number:
Plug Integrity BOP Test Mechanical Integrity Test Location Clearance
Other Conditions of Approval:
Post Initial Injection MIT Req'd? Yes No
APPROVED BY
Approved by: COMMISSIONER THE AOGCC Date:
Comm. Comm. Sr Pet Eng Sr Pet Geo Sr Res Eng
3,672
745 NA NA
Ryan Rupert
Subsequent Form Required:
Suspension Expiration Date:
Will perfs require a spacing exception due to property boundaries?
Current Pools:
MPSP (psi): Plugs (MD):
17. I hereby certify that the foregoing is true and the procedure approved herein will not be deviated from without prior written approval.
Authorized Name and
Digital Signature with Date:
Tubing Size:
PRESENT WELL CONDITION SUMMARY
AOGCC USE ONLY
Tubing Grade: Tubing MD (ft):Perforation Depth TVD (ft):
3,672
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
APPLICATION FOR SUNDRY APPROVALS
20 AAC 25.280
ADL0355024, ADL0373301, ADL0390616, ADL0391283
211-052 & 213-132
NIKAITCHUQ OP14-S03& L1
3800 Centerpoint Dr, Suite 1400 Anchorage, AK 99503 50-029-23447-00-00 and 60-00
NIKAITCHUQ
Hilcorp Alaska, LLC
Length Size
Proposed Pools:
3,672 21,363 3,672
SCHRADER BLUFF OIL Same
154 154
12.6#, L-880
TVD Burst
7,395
slotted
MD
NA
slotted
10,440
5,020psi
5,750psi
2,163
3,847
3,672
2,324
10,440
See Schematic
3,6725-1/2"
154 20"
13-3/8"
9-5/8"
2,324
5-1/2"11,127
See Schematic
907-777-8503
ryan.rupert@hilcorp.com
Operations Manager
November 20, 2025
4/1/2002
Perforation Depth MD (ft):
NA
NA and NA NA and NA
21,363
21,325
11,381
21,325
Form 10-403 Revised 06/2023 Approved application valid for 12 months from date of approval.Submit PDF to aogcc.permitting@alaska.gov
By Grace Christianson at 7:52 am, Nov 10, 2025
Digitally signed by Sara
Hannegan (2519)
DN: cn=Sara Hannegan (2519)
Date: 2025.11.07 15:53:53 -
09'00'
Sara Hannegan
(2519)
325-685
A.Dewhurst 10NOV25
10-404
MGR12NOV2025
*BOPE pressure test to 2000 psi. 24 hour notice to AOGCC.
DSR-11/13/25JLC 11/13/2025
11/13/25
ESP Swap RWO
Well: OP14
Well Name:OP14 API Number:50-029-23447-00-00
Current Status:ESP producer Permit to Drill Number:211-052
First Call Engineer:Ryan Rupert (907) 301-1736 (c)
Second Call Engineer:Keith Lopez (907) 903-5432 (c)
Regulatory Tech Darci Horner (907) 777-8406 (w)
Maximum Expected BHP:1100 psi @ 3,558 TVD (6.0ppg) 2025 Max offset static
Max. Potential Surface Pressure: 745 psi Using 0.1 psi/ft
Brief Well Summary
OP14 is a dual lateral OA sand producer. It is currently showing performance issues, and likely needs an ESP
swap. It passed an MIT of the 9-5/8 casing in 2022.
The goal of this project is install a new ESP and return the well to full production
Pertinent wellbore information:
- Deviation: Goes >70 degrees at 3600 MD
- DLS:
o Max DLS above top liner = 5.7 degrees / 100 at 1175 MD
o DLS spike into 3-6 degrees / 100 from top liner up to 8,000 MD
o Current ESP set from 7395 7475, but that was only due to cable length onsite at the time
o Previous ESPs were successfully set from 7700 7850 MD
-Last casing test: MIT PASSED to 1600psi against a 9-5/8 test packer set at 9950 MD on 5/5/22.
- Pertinent History:
o June-2011: Drill and complete as single OA lateral. Installed TT-ESP (0.2 year run life)
o Sept-2011: ESP yo-yo RWO. Installed TT-ESP
o 2012: ESP yo-yo RWO. Installed TT-ESP
o 2013: Elective ESP pull for add-lateral drilling
9-5/8 casing scraper down to 10,137 MD
Set isolation packer at 10,210 MD. Passed PT to 500psi
Run new TT-ESP after 2nd lateral added
o 2014: ESP yo-yo RWO. Installed conventional ESP with 7 shroud
o 2022: RWO
Pulled failed ESP, and ran casing scraper and magnets to ToL at 9970 MD (68# metal
recovered)
Ran VACS tool and magnets to 1500 inside top lateral to 14,482 MD (all the pipe we
had). Recovered 29# more metal on magnets and minimal debris inside snorkel pipe
Ran 9-5/8 test packer to 9950 MD, and PASSED MIT above to 1600psi
Ran conventional ESP
ESP Swap RWO
Well: OP14
RWO Procedure
1. MIRU Nordic #4
2. Circulate / kill well:
a. Work over fluid will be injection water (8.33ppg or heavier)
b. Ensure any wellbore fluids are fully displaced with KWF either via circulation or bullheading
c. Tubing volume = 114bbls
d. IA to top liner = 612bbls
3. Set BPV/TWC, ND tree, NU BOP stack (see attached)
a. Notify AOGCC 24 hours in advance for witness
b. Test to 250psi Low /2,500psi High / 2,500psi Annular
c. BOPE will be used as needed to circulate the well
4. Pull BPV/TWC (lubricate out if pressure below is suspected)
5. Unseat hanger
6. POOH laying down 4-1/2 ESP completion
7. Pickup cleanout run (if necessary)
8. Cleanout casing and liner as deep as practical
9. Pickup and RIH with 3-1/2 tubing ESP completion
a. Bottom ESP to be set at ±7,900 MD
10. Land ESP completion
11. Set BPV/TWC, ND BOP
12. NU tree and test, pull BPV/TWC
13. RDMO RWO crew and equipment
Attachments:
1. Current Well Schematic
2. Proposed Well Schematic
3. BOP schematic
Completion Tubing: 4-½ 12.6# L80 TH563 TK-15XT internal coatedWell Head: Vault MB-247 13-5/8" 5K5-½ HAL Oil Swell Packer4-½ x-cplg cable clamps, for ESP Power Cable(1) 3/8" Chem Inj LineOP14-S3Dual Lateral Producerwith ESP Lift5-½ Silver Bullet Ecc Nose Guide Shoe 9-5/8" 40# L80 TH56310,440' MD 3,847' TVD 87º21,325' MD 3,671' TVD5-½ 17# L80 TH521 Slotted10,198' MD Baker SLXP LTP13-3/8" 68# L80 BTC2,324' MD 2,163' TVD36º7,475' MD 3,534' TVD 82ºBaker Conventional ESP, Bottom of Motor Centralizer7,395' MD 3,522' TVD Discharge Gauge Sub9,982' MDBaker SLXP LTP10,102-10,118' MD Window21,363' MD 3,672' TVD5-½ 15.5# L80 TH521 SlottedAs Completed5/9/20225-½ HAL Water Swell Packer21,371' MD 90° 8-¾ TD (L1: 2013)21,340' MD 89° 8-¾ TD (2011)
Proposed Completion Tubing: 3-½ 9.3# 13Cr5-½ HAL Oil Swell PackerProposed ESP Power Cable and (1) 3/8" Chem Inj LineOP14-S3Dual Lateral Producerwith ESP Lift5-½ Silver Bullet Ecc Nose Guide Shoe 9-5/8" 40# L80 TH56310,440' MD 3,847' TVD 87º21,325' MD 3,671' TVD5-½ 17# L80 TH521 Slotted10,198' MD Baker SLXP LTP13-3/8" 68# L80 BTC2,324' MD 2,163' TVD36º~7,900' MD 3,934' TVD 82ºProposed ESP, Bottom of Motor Centralizer~7,820' MD 3,583' TVD Discharge Gauge Sub9,982' MDBaker SLXP LTP10,102-10,118' MD Window21,363' MD 3,672' TVD5-½ 15.5# L80 TH521 SlottedProposed11/7/20255-½ HAL Water Swell Packer21,371' MD 90° 8-¾ TD (L1: 2013)21,340' MD 89° 8-¾ TD (2011)OP14-S3 Proposed Schematic 11-7-2025.vsdx Last edited by: DH 11/7/2025
Nordic Rig 4 ARRS 5M
Nordic Calista 02.24.2025
All Components 5,000 psi
BLIND/SHEAR RAMS
VBR RAMS
CHOKE
HCR
MANUAL
CHOKE
KILL
HCR
INSIDE
KILL3" 5,000 PSI WP KILL
LINE
Annular
2 7/8 x 5 VBR
Technical Report Title
Date
Client: ENI Petroleum
Field: Nikaitchuq
Rig: Nabors 245
Date: October 21, 2013
Surface Data Logging
End of Well Report
OP14-S3L1
TABLE OF CONTENTS
1. General Information
2. Daily Summary
3. Days vs. Depth
4. After Action Review
5. Formation Tops
6. Mud Record
7. Bit Record
8. Morning Reports
9. Survey Report
Digital Data to include:
Final Logs Files
Final End of Well Report
Halliburton Log Viewer
EMF Log Viewer
GENERAL WELL INFORMATION
Company: ENI Petroleum
Rig: Nabors 245E
Well: OP14-S3L1
Field: Nikaitchuq – Oliktok Point
Borough: North Slope Borough
State: Alaska
Country: United States
API Number: 50-029-23447-60-00
Sperry Job Number: AK-AM-0900765688
Job Start Date: 20 September 2013
Spud Date: 27 September 2013
Total Depth Date: 09 October 2013
Total Depth: 21371’ MD, 3671’ TVD
North Reference: True
Magnetic Declination: 19.690°
Magnetic Dip Angle: 81.021°
Total Magnetic Field Strength: 57630.045 nT
Date Of Magnetic Data: 01 October 2013
Wellhead Coordinates N: North 70° 30’ 39.46803”
Wellhead Coordinates W: West 149° 51’ 49.58502“
Drill Floor Elevation 53.230’
Ground Elevation: 12.200’
Permanent Datum: Mean Sea Level
SDL Engineers: Emil Opitz, Josiah Failing
Charles Sinn, Jeremy Tiegs
Company Geologist: Andrew Buchanan
Company Representatives: Bruce Simonson, Ben Perry
SSDS Unit Number: 121
DAILY SUMMARY
09/19/2013
Move rig from OP19 and rig up on OP14-S3L1.
09/20/2013
Kill well, nipple down tree, nipple up tree and test BOPs.
09/21/2013
Complete BOP test. Begin pulling tubing / ESP.
09/22/2013
Lay down 4.5" tubing to GLM at 7600’ MD. Pump and shear GLM valve. Pull out of hole with
tubing to 1645’ MD. Rig up W ireline and retrieve Slip Stop, Pack Off and Pump. Continue pulling
4.5" tubing.
09/23/2013
Spool up ESP cable and lay down tools. Pick up casing scraping BHA and RIH, picking up DP
singles.
09/24/2013
Finish RIH with scraper BHA and tag liner @ 10210' MD. Slip & Cut. Trip out of hole and lay
down scraper BHA. Pick up packer BHA. and TIH picking up 5" DP singles. At 4800' MD at
report time.
09/25/2013
Run wireline logging. POOH and R/D wireline. P/U and M/U BHA for whipstock-milling run.
09/26/2013
Run wireline logging. POOH and R/D wireline. P/U and M/U BHA for whipstock-milling run.
09/27/2013
Run in hole with whipstock BHA. Trip in hole to bottom and begin to orientate whipstock at
10144' MD. Set whipstock at 10121' Displace to FazePro OBM. Begin milling window.
Gas: Max gas of 33 units with a max trip gas of 626 units.
09/28/2013
Finish milling window, and polish window per Baker rep. Pump sweeps. Trip out of hole and
lay down milling BHA. Pull wear ring, and prepare to test BOPs.
Gas: Max gas of 25 units from 10136’ MD with an average gas of 17 units.
09/29/2013
Finish testing BOPs. Pick up BHA #1 and RIH. Drill/slide ahead with 1.83* motor per Geologist
and Directional driller to 10465' MD. Pull wear ring, and prepare to test BOPs. Back ream out of
hole per K&M.
Gas: Max gas of 292 units from 10324’ MD with an average gas of 115 units and a background
gas of 72 units.
Geology: Spot samples show varying amounts of Siltstone/Shale, with increasing percentages
of unconsolidated sands that correlate with increases in gas.
09/30/2013
Back ream out of hole per K&M. Monitor well, and then TOOH. L/D BHA #1. Pick up BHA #2
and trip in hole.
Gas: Max trip gas of 98 units.
10/01/2013
Trip in hole to 10055’ MD. Log previously drilled open hole for build section of production hole
from 10050 to 10465’ MD. Begin drilling ahead production hole.
Gas: Max gas 1626 units from 11144’ MD and Average 450 units
10/02/2013
Continue drilling ahead in production hole. Monitoring losses while drilling.
Gas: Max trip gas of 2049 units from 11623’ MD, with an average gas of 767 units.
10/03/2013
Continue drilling ahead in production hole, monitoring losses while drilling. At 13119, losses of
80+ barrels per hour while circulating and losses of 36 barrels per hour static. Insufficient
drilling fluid on location to drill ahead. Circulate and reciprocate pipe while waiting on mud
trucks to deliver more drilling fluid. After receiving fluid, resume drilling ahead with losses
between 10-20 barrels per hour.
Gas: Max gas of 1182 units at 13070’ MD with an average gas of 585 units.
10/04/2013
Continue drilling ahead in production section.
Gas: Max gas of 1183 units at 15197’ MD with an average gas of 494 units.
10/05/2013
Continue drilling ahead in production section.
Gas: Max gas of 928 units at 15633’ MD with an average gas of 512 units.
10/06/2013
Continue drilling ahead in production section.
Gas: Max gas of 824 units at 17820’ MD with an average gas of 398 units.
10/07/2013
Continue drilling ahead in production section.
Gas: Max gas of 823 units at 19766’ MD with an average gas of 507 units.
10/08/2013
Back ream out of hole 10 stands as per K&M. Pick up 30 five inch drill pipe joints and stand
back. Run in hole to bottom and continue drilling ahead in production section.
Gas: Max gas of 713 units at 19884’ MD with an average gas of 395 units.
10/09/2013
Drill ahead to production target depth of 21371’ MD, 3671’ TVD. Back ream out of hole per
K&M.
Gas: Max gas 842 units at 21104’ MD with an average gas of 377 units.
10/010/2013
Back ream out of hole per K&M.
Gas: Max trip gas of 81 units.
10/11/2013
Back ream out of hole to 10341’ MD and then trip out of hole through window to 10055’ MD.
Circulate bottoms up three times. Pull out of hole and lay down bottom hole assembly. Rig up
and begin to test blow out preventers.
10/12/2013
Finish testing blow out preventers. Pick up bottom hole assembly with whipstock retrieval tool
and run in hole. Retrieve whipstock and trip out of hole.
10000
11000
12000
13000
14000
15000
16000
17000
18000
19000
20000
21000
22000
0 5 10 15 20 25 30
Me
a
s
u
r
e
d
D
e
p
t
h
Rig Days
Prognosed
Actual
WELL NAME: OP14-S3 L1
OPERATOR: ENI Petroleum
MUD CO: MI Swaco
RIG: Nabors 245
SPERRY JOB: AK-XX-0900765688
Days vs. Depth
19 Sept 2013
Sperry SDL Remain on Location
from Previous Well
LOCATION: Nikaitchuq
AREA: North Slope Borough
STATE: Alaska
SPUD: 27 Sept 2013
TD: 9 Oct 2013
TD Production Hole Section
21371' MD, 3671.43' TVD
Off Bot: 15:15 09 Oct 2013
Commenced 8.75" Production
Hole Section
On Bot: 16:00 28 Sept 2013
Resume Drilling
On Bot: 11:15 08 Oct 2013
Pull off bottom and backream 10
stands. P/U 30 joints of 5" DP.
(Planned)
19821' MD, 3702.8' TVD
Off Bot: 00:00 08 Oct 2013
WELL NAME:LOCATION:Oliktok Point
OPERATOR:AREA:North Slope
SPERRY JOB:STATE:Alaska
RIG:Nabors 245 HOLE SECTION Production
EMPLOYEE NAME:DATE:
Sperry Drilling Confidential Document v 3.0
ENI Petroleum
AK-XX-0900765688
Emil Opitz 19-Oct-2013
OP14-S31
What went as, or better than, planned:
Gaps in mudlog, missing data, INISTE failures and abnormalities, DEX issues.
Recommendations:
Innovations and/or cost savings:
WITS connection with SLB for realtime gamma and ECD's worked well.
Difficulties experienced:
Making sure to check requipment on a regular basis.
N/A
Surface Data Logging
After Action Review
Surface Data Logging
WELL NAME:OP14-S3L1 LOCATION:Nikaitchuq
OPERATOR:ENI Petroleum AREA:North Slope Borough
MUD CO:MI Swaco STATE:Alaska
RIG:Nabors 245 SPUD:27-Sep-2013
SPERRY JOB:AK-XX-0900765688 TD:9-Oct-2013
Marker MD INC AZ TVD TVDSS
12 1/4" Intermediate Borehole
N Sequence Top 7,485.0 82.0 10.4 3,534.8 -3,481.6
N Sand Top 7,918.0 81.7 10.9 3,596.2 -3,543.0
N Sand Bottom 8,690.0 83.8 0.3 3,690.7 -3,637.5
N-Sequence Base 9,610.0 84.4 323.6 3,766.0 -3,712.8
OA Sand Top 10,228.5 85.4 317.2 3,829.2 -3,776.0
8 3/4" OP14-S3L1 Borehole
Top of window 10,102.0 83.9 304.9 3,816.3 -3,763.0
Bottom of window 10,119.0 84.2 304.0 3,818.0 -3,764.8
OA-Sand Top 10,292.0 86.0 294.8 3,832.2 -3,779.0
OA-2 Top 10,464.0 88.2 292.4 3,841.7 -3,788.5
OA-2 Top 10,647.0 90.5 292.2 3,841.9 -3,788.7
OA-2 Top 10,711.0 90.2 292.1 3,841.5 -3,788.3
Fault A 10,941.0 89.0 293.7 3,843.0 -3,789.7
Fault B 12,086.0 90.2 304.8 3,839.0 -3,785.8
OA-3 Top 12,574.0 92.1 309.8 3,824.1 -3,770.9
OA-2 Top 12,715.0 91.6 307.7 3,820.0 -3,766.8
OA-2 Top 14,133.0 89.0 312.8 3,820.3 -3,767.0
OA-3 Top 14,277.0 87.8 312.9 3,825.2 -3,772.0
OA-3 Top 16,026.0 91.4 309.6 3,801.6 -3,748.4
OA-2 Top 16,156.0 93.1 310.0 3,795.9 -3,742.7
OA-2 Top 17,242.0 90.7 302.4 3,770.9 -3,717.7
OA-3 Top 17,396.0 89.0 295.7 3,772.6 -3,719.3
OA-3 Top 18,382.0 94.2 292.0 3,739.4 -3,686.1
OA-2 Top 18,548.0 93.9 295.6 3,727.8 -3,674.6
OA-2 Top 19,295.0 89.3 306.8 3,701.4 -3,648.1
OA-3 Top 19,520.0 89.9 306.6 3,701.9 -3,648.7
Fault C 20,188.0 91.4 303.2 3,694.6 -3,641.4
OA-Sand Top 20,292.0 89.0 301.5 3,694.0 -3,640.7
OA-2 Top 20,413.0 90.3 299.4 3,696.2 -3,643.0
OA-2 Top 20,985.0 92.9 298.1 3,677.4 -3,624.2
TD 8 3/4" Borehole 21,371.0 89.5 295.0 3,671.4 -3,618.2
Formation Tops
OP14-S3L1
ENI Petroleum
MI Swaco
Nabors 245
AK-XX-0900765688
Date Depth Wt Vis PV YP Gels Filt
R600/R300/R200/R100/
R6/R3 Cake Solids Oil/Water Sd Pm pH MBT Pf/Mf Chlor Hard
ft - MD ppg sec lb/100 lb/100ft2 m/30m Rheometer 32nds %%%ppb Eqv mg/l Ca++
21-Sep 21325 8.40 27 ----------7.9 --600 120 Pull tubing
22-Sep 21325 8.40 27 ----------7.9 --600 120 POOH with 4.5" tubing
23-Sep 21325 8.40 27 ----------7.9 --600 120 Begin RIIH with scraper
24-Sep 21325 8.40 27 ----------7.9 --600 120 TIIH with 5" DP
25-Sep 21325 8.40 28 ----------8.1 --600 120 Rig up wireline
26-Sep 21325 8.40 28 ----------8.4 --800 180 Pick up Whipstock BHA
Date Depth Wt Vis PV YP Gels HTHP
R600/R300/R200/R100/
R6/R3 Cake Solids Oil/Water
Alka
POM
Excess
Lime Elec Stab CaCl2 WPS LGS/HGS ASG Remarks
ft - MD ppg sec lb/100 lb/100ft2 m/30m Rheometer 32nds %%ml ppb volts ppb ppm ppb ASG
27-Sep 10118 8.40 120 15 17 7/8/8 6.5 47/32/25/18/9/7 1 10.0 60%1.50 2.25 400 ----Milling Window
28-Sep 10140 8.65 60 15 18 8/8/9 6.5 48/33/27/20/9/8 1 8.8 58%1.50 1.95 400 ----Testing BOP
29-Sep 10150 8.65 58 14 16 7/7/8 6.5 44/30/24/18/8/7 1 8.6 67%1.40 1.82 245 ----Back ream out of hole
30-Sep 10465 8.75 69 19 25 11/12/13 6.0 63/44/38/29/12/11 1 8.6 66%2.00 2.60 500 ----TIIH with Directional BHA
1-Oct 11190 8.75 65 18 24 11/11/12 5.2 60/42/35/27/12/11 1 8.5 67%2.15 2.80 535 ----Drilling Ahead
2-Oct 12700 8.7 52 14 17 7/7/8 5.2 45/31/25/19/8/7 1 9.72 71%2.1 2.73 480 ----Drilling Ahead
3-Oct 13945 8.7 52 13 15 7/7/8 4.0 41/28/23/17/7/6 1 8.7 68%1.8 2.34 420 ----Drilling Ahead
4-Oct 15417 8.65 52 13 15 7/7/8 5.4 41/28/23/17/7/6 1 14 70%2 2.6 450 ----Drilling Ahead
5-Oct 16800 8.7 52 14 14 7/7/8 4.8 41/28/23/17/7/6 1 8.81 71%2 2.6 505 ----Drilling Ahead
6-Oct 18289 8.65 53 13 16 7/7/8 5.1 42/29/24/17/7/6 1 9.63 72%1.9 2.47 470 ----Drilling Ahead
7-Oct 19524 8.7 53 14 17 7/8/8 5.2 45/31/25/19/7/6 1 8.55 71%1.8 2.34 465 ----Drilling Ahead
8-Oct 20273 8.75 53 14 17 7/7/8 5.4 45/31/25/19/8/7 1 8.54 70%2.05 2.67 460 ----Drilling Ahead
9-Oct 21371 8.65 53 14 16 7/8/8 5.4 44/30/25/19/8/7 1 9 70%1.80 2.34 445 ----BROOH
10-Oct 21371 8.70 54 13 15 7/7/8 5.4 41/28/22/16/7/6 1 7.6 69%2.00 2.60 400.0 ----BROOH to Window
11-Oct 21371 8.70 56 14 16 7/7/8 5.2 44/30/24/18/7/6 1 9.0 69%2.00 2.60 395.0 ----BOP Test
Casing Record
WELL NAME:LOCATION:Nikaitchuq
OPERATOR:AREA:North Slope Borough
MUD CO:STATE:Alaska
RIG:SPUD:27-Sep-2013
SPERRY JOB:TD:9-Oct-2013
Remarks
9.625" Casing @ 10102' MD, 3816'TVD
W
a
t
e
r
a
n
d
O
i
l
B
a
s
e
d
M
u
d
BHA#SDL
RUN #Bit #Bit Type Bit Size Depth In Depth
Out Footage Bit Hours TFA AVG
ROP
WOB
(max)
RPM
(max)
SPP
(max)
FLOW GPM
(max)Bit Grade Comments
1 200 1 Smith Milled Tooth XR+8.75"10150 10465 315 5.50 0.746 57.8 10 40 2000 450 1-1-WT-A-E-I-NO-BHA Production Build Section TD
2 300 2 Hycalog SKH616M-E1D 8.75"10465 21371 10906 100.70 0.902 108.4 5 120 2700 500 1-1-BT-N-X-I-NO-TD Reach Production Section TD
WELL NAME:OP14-S3L1 LOCATION:Nikaitchuq
OPERATOR:ENI Petroleum AREA:North Slope Borough
MUD CO:
SPERRY JOB:AK-XX-0900765688 TD:9-Oct-2013
MI Swaco STATE:Alaska
RIG:Nabors 245 SPUD:27-Sep-2013
B
i
t
R
e
c
o
r
d
.
.
*
24 hr Recap:
Move rig from OP19 and rig up on OP14-S3L1.
ROP (ft/hr)
Min
YP
MaxECD
(ppg)
Density (ppg)Viscosity
out (sec/qt)
ROP
MWD Summary
Morning Report Report # 01
Customer:
Well:
Area:
Location:
Rig:
Job No.:
Daily Charges:
Time:
Date:
Cor Solids
%cP
Total Charges:
Rig Activity:
@
Current Pump & Flow Data:
Report For:
24 hr Max
96%
Ratio
Mud Data
Depth
Tools
Oil / Water
(lb/100ft2)
PV
4.23
(lb/bbl)ml/30minMud Type
WOB ConditionTFABit #Size Hours Footage RPM
0
(current)
Units*
100% Gas In Air=10,000 Units
Type Comments
0
Background Trip Connection0
(max)-
Average 0
C-5i
0
C-1
0
0
0
0
C-3
Clyst
C-4i
Cement
Gas Summary
ClySiltst
Chromatograph (ppm)
Sh Coal
Weight
Sd Lst
Avg
Alkal
Mud
Flow In (spm) Gallons/stroke
Lime
TuffGvl
API FL
C-5nC-4n
00
0 0
C-2
0
0
0 00
Minimum 0 0
Depth
Maximum
in
Set At
Ss Cht
19-Sep-2013
24:00:00
13382'
13382'
0'
Yesterday's Depth:
Current Depth:
24 Hour Progress:
ENI Petroleum AK-AM-0900653122
to
OP14-S3L1
Nikaitchuq
Oliktok Point
Depth
Grade
Nabors 245E
907-685-1490Unit Phone:
0
Charles Sinn
SPP (psi)
Report By:Logging Engineers:C. Sinn / J. Tiegs
(max)
Rig Move
Perry/Ruminer
Depth in / out
Max @ ftAvg
Casing
Summary
Size
Current
Bit Type
Flow In (gpm)
Lithology (%)
(current)
0
.
.
*
24 hr Recap:
Kill well, nipple down tree, nipple up and test BOPs.
ROP (ft/hr)
Min
YP
MaxECD
(ppg)
Density (ppg)Viscosity
out (sec/qt)
ROP
MWD Summary
Morning Report Report # 02
Customer:
Well:
Area:
Location:
Rig:
Job No.:
Daily Charges:
Time:
Date:
Cor Solids
%cP
Total Charges:
Rig Activity:
@
Current Pump & Flow Data:
Report For:
24 hr Max
96%
Ratio
Mud Data
Depth
Tools
Oil / Water
(lb/100ft2)
PV
4.23
(lb/bbl)ml/30minMud Type
WOB ConditionTFABit #Size Hours Footage RPM
0
(current)
Units*
100% Gas In Air=10,000 Units
Type Comments
0
Background Trip Connection0
(max)-
Average 0
C-5i
0
C-1
0
0
0
0
C-3
Clyst
C-4i
Cement
Gas Summary
ClySiltst
Chromatograph (ppm)
Sh Coal
Weight
Sd Lst
Avg
Alkal
Mud
Flow In (spm) Gallons/stroke
Lime
TuffGvl
API FL
C-5nC-4n
00
0 0
C-2
0
0
0 00
Minimum 0 0
Depth
Maximum
in
Set At
Ss Cht
20-Sep-2013
24:00:00
82'
82'
0'
Yesterday's Depth:
Current Depth:
24 Hour Progress:
ENI Petroleum AK-AM-0900653122
to
OP14-S3L1
Nikaitchuq
Oliktok Point
Depth
Grade
Nabors 245E
907-685-1490Unit Phone:
0
Charles Sinn
SPP (psi)
Report By:Logging Engineers:C. Sinn / J. Tiegs
(max)
Test BOPs
Perry/Ruminer
Depth in / out
Max @ ftAvg
Casing
Summary
Size
Current
Bit Type
Flow In (gpm)
Lithology (%)
(current)
0
.
.
*
24 hr Recap:
Lithology (%)
(current)
0
Max @ ftAvg
Casing
Summary
Size
Current
Bit Type
Flow In (gpm)
Report By:Logging Engineers:C. Sinn / J. Tiegs
(max)
Pull tubing
Perry/Ruminer
Depth in / out
Grade
Nabors 245E
907-685-1490Unit Phone:
0
Charles Sinn
SPP (psi)
ENI Petroleum AK-AM-0900653122
to
OP14-S3L1
Nikaitchuq
Oliktok Point
Depth
21-Sep-2013
24:00:00
10148'
10148'
0'
Yesterday's Depth:
Current Depth:
24 Hour Progress:
Depth
Maximum
in
Set At
Ss Cht
0
Minimum 0 0
0 0
C-2
0
0
C-5nC-4n
00
0 0
Flow In (spm) Gallons/stroke
Lime
TuffGvl
API FL
Avg
Alkal
Mud
Coal
Weight
Sd LstSiltst
Chromatograph (ppm)
Sh Cement
Gas Summary
Cly
C-3
Clyst
C-4i
0
C-1
0
0
0
0
C-5i
Average 0
0
(max)-Background Trip Connection 100% Gas In Air=10,000 Units
Type Comments
0 0
(current)
Units*
Size Hours Footage RPM ConditionTFA
Kill Mud
Bit #
4.23
(lb/bbl)ml/30minMud Type
8.40
WOB
Ratio
Mud Data
Depth
Tools
Oil / Water
(lb/100ft2)
PV
Total Charges:
Rig Activity:
@
Current Pump & Flow Data:
Report For:
24 hr Max
96%
8.40 66
Cor Solids
%cP
Morning Report Report # 03
Customer:
Well:
Area:
Location:
Rig:
Job No.:
Daily Charges:
Time:
Date:
ROP
MWD Summary
out (sec/qt)
ROP (ft/hr)
Min
YP
MaxECD
(ppg)
Density (ppg)Viscosity
Complete BOP test. Begin pulling tubing / ESP.
.
.
*
24 hr Recap:
Rig up Wireline and retrieve Slip Stop, Pack Off and Pump. Continue pulling 4.5" tubing
Lay down 4.5" tubing to GLM at 7600’ MD. Pump and shear GLM valve. Pull out of hole with tubing to 1645’ MD.
ROP (ft/hr)
Min
YP
MaxECD
(ppg)
Density (ppg)Viscosity
out (sec/qt)
ROP
MWD Summary
Morning Report Report # 04
Customer:
Well:
Area:
Location:
Rig:
Job No.:
Daily Charges:
Time:
Date:
8.40 66
Cor Solids
%cP
Total Charges:
Rig Activity:
@
Current Pump & Flow Data:
Report For:
24 hr Max
96%
Ratio
Mud Data
Depth
Tools
Oil / Water
(lb/100ft2)
PV
4.23
(lb/bbl)ml/30minMud Type
8.40
WOB ConditionTFA
Kill Mud
Bit #Size Hours Footage RPM
0
(current)
Units*
100% Gas In Air=10,000 Units
Type Comments
0
Background Trip Connection0
(max)-
Average 0
C-5i
0
C-1
0
0
0
0
C-3
Clyst
C-4i
Cement
Gas Summary
ClySiltst
Chromatograph (ppm)
Sh Coal
Weight
Sd Lst
Avg
Alkal
Mud
Flow In (spm) Gallons/stroke
Lime
TuffGvl
API FL
C-5nC-4n
00
0 0
C-2
0
0
0 00
Minimum 0 0
Depth
Maximum
in
Set At
Ss Cht
22-Sep-2013
24:00:00
10148'
10148'
0'
Yesterday's Depth:
Current Depth:
24 Hour Progress:
ENI Petroleum AK-AM-0900653122
to
OP14-S3L1
Nikaitchuq
Oliktok Point
Depth
Grade
Nabors 245E
907-685-1490Unit Phone:
0
Charles Sinn
SPP (psi)
Report By:Logging Engineers:C. Sinn / J. Tiegs
(max)
Pull tubing
Perry/Ruminer
Depth in / out
Max @ ftAvg
Casing
Summary
Size
Current
Bit Type
Flow In (gpm)
Lithology (%)
(current)
0
.
.
*
24 hr Recap:
Lithology (%)
(current)
0
Max @ ft Avg
Casing
Summary
Size
Current
Bit Type
Flow In (gpm)
Report By: Logging Engineers: E. Opitz / C. Sinn
(max)
RIH w/ Scraping BHA
Perry / Ruminer
Depth in / out
Grade
Nabors 245E
907-685-1490 Unit Phone:
0
E. Opitz
SPP (psi)
ENI Petroleum AK-AM-0900765688
to
OP14-S3L1
Nikaitchuq
Oliktok Point
Depth
23-Sep-2013
24:00:00
10148'
10148'
0'
Yesterday's Depth:
Current Depth:
24 Hour Progress:
Depth
Maximum
in
Set At
Ss Cht
0
Minimum 0 0
0 0
C-2
0
0
C-5n C-4n
00
0 0
Flow In (spm) Gallons/stroke
Lime
Tuff Gvl
API FL
Avg
Alkal
Mud
Coal
Weight
Sd Lst Siltst
Chromatograph (ppm)
Sh Cement
Gas Summary
Cly
C-3
Clyst
C-4i
0
C-1
0
0
0
0
C-5i
Average 0
0
(max)
-Background Trip Connection 100% Gas In Air =10,000 Units
Type Comments
0 0
(current)
Units*
Size Hours Footage RPM Condition TFA
Kill Mud
Bit #
4.23
(lb/bbl) ml/30min Mud Type
8.40
WOB
Ratio
Mud Data
Depth
Tools
Oil / Water
(lb/100ft 2)
PV
Total Charges:
Rig Activity:
@
Current Pump & Flow Data:
Report For:
24 hr Max
96%
8.40 27
Cor Solids
%cP
Morning Report Report # 05
Customer:
Well:
Area:
Location:
Rig:
Job No.:
Daily Charges:
Time:
Date:
ROP
MWD Summary
out (sec/qt)
ROP (ft/hr)
Min
YP
Max ECD (ppg)
Density (ppg) Viscosity
Spool up ESP cable and L/D tools. P/U casing scraping BHA and RIH, picking up DP singles.
.
.
*
24 hr Recap:
and TIH picking up 5" DP singles. At 4800' MD at report time.
Finish RIH with scraper BHA and tag liner @ 10210' MD. Slip & Cut. TOOH and L/D scraper BHA. P/U packer BHA
ROP (ft/hr)
Min
YP
Max ECD (ppg)
Density (ppg) Viscosity
out (sec/qt)
ROP
MWD Summary
Morning Report Report # 06
Customer:
Well:
Area:
Location:
Rig:
Job No.:
Daily Charges:
Time:
Date:
8.40 28
Cor Solids
%cP
Total Charges:
Rig Activity:
@
Current Pump & Flow Data:
Report For:
24 hr Max
96%
Ratio
Mud Data
Depth
Tools
Oil / Water
(lb/100ft 2)
PV
4.23
(lb/bbl) ml/30min Mud Type
8.40
WOB Condition TFA
Kill Mud
Bit # Size Hours Footage RPM
0
(current)
Units*
100% Gas In Air =10,000 Units
Type Comments
0
Background Trip Connection 0
(max)
-
Average 0
C-5i
0
C-1
0
0
0
0
C-3
Clyst
C-4i
Cement
Gas Summary
Cly Siltst
Chromatograph (ppm)
Sh Coal
Weight
Sd Lst
Avg
Alkal
Mud
Flow In (spm) Gallons/stroke
Lime
Tuff Gvl
API FL
C-5n C-4n
00
0 0
C-2
0
0
0 00
Minimum 0 0
Depth
Maximum
in
Set At
Ss Cht
24-Sep-2013
24:00:00
10148'
10148'
0'
Yesterday's Depth:
Current Depth:
24 Hour Progress:
ENI Petroleum AK-AM-0900765688
to
OP14-S3L1
Nikaitchuq
Oliktok Point
Depth
Grade
Nabors 245E
907-685-1490 Unit Phone:
0
E. Opitz
SPP (psi)
Report By: Logging Engineers: E. Opitz / C. Sinn
(max)
RIH w/ packer
Perry / Ruminer
Depth in / out
Max @ ft Avg
Casing
Summary
Size
Current
Bit Type
Flow In (gpm)
Lithology (%)
(current)
0
.
.
*
24 hr Recap:
Lithology (%)
(current)
0
Max @ ft Avg
Casing
Summary
Size
Current
Bit Type
Flow In (gpm)
Report By: Logging Engineers: E. Opitz / C. Sinn
(max)
R/U SLB Wireline
Perry / Ruminer
Depth in / out
Grade
Nabors 245E
907-685-1490 Unit Phone:
0
E. Opitz
SPP (psi)
ENI Petroleum AK-AM-0900765688
to
OP14-S3L1
Nikaitchuq
Oliktok Point
Depth
25-Sep-2013
24:00:00
10148'
10148'
0'
Yesterday's Depth:
Current Depth:
24 Hour Progress:
Depth
Maximum
in
Set At
Ss Cht
0
Minimum 0 0
0 0
C-2
0
0
C-5n C-4n
00
0 0
Flow In (spm) Gallons/stroke
Lime
Tuff Gvl
API FL
Avg
Alkal
Mud
Coal
Weight
Sd Lst Siltst
Chromatograph (ppm)
Sh Cement
Gas Summary
Cly
C-3
Clyst
C-4i
0
C-1
0
0
0
0
C-5i
Average 0
0
(max)
-Background Trip Connection 100% Gas In Air =10,000 Units
Type Comments
0 0
(current)
Units*
Size Hours Footage RPM Condition TFA
Kill Mud
Bit #
4.23
(lb/bbl) ml/30min Mud Type
8.40
WOB
Ratio
Mud Data
Depth
Tools
Oil / Water
(lb/100ft 2)
PV
Total Charges:
Rig Activity:
@
Current Pump & Flow Data:
Report For:
24 hr Max
96%
8.40 28
Cor Solids
%cP
Morning Report Report # 07
Customer:
Well:
Area:
Location:
Rig:
Job No.:
Daily Charges:
Time:
Date:
ROP
MWD Summary
out (sec/qt)
ROP (ft/hr)
Min
YP
Max ECD (ppg)
Density (ppg) Viscosity
TIH with packer to 10220' MD. Set packer. Test packer to 500psi. Monitor well - static. TOOH and stand back 5" DP.
Begin to R/U SLB wireline.
.
.
*
24 hr Recap:
Run wireline logging. POOH and R/D wireline. P/U and M/U BHA for whipstock-milling run.
ROP (ft/hr)
Min
YP
Max ECD (ppg)
Density (ppg) Viscosity
out (sec/qt)
ROP
MWD Summary
Morning Report Report # 08
Customer:
Well:
Area:
Location:
Rig:
Job No.:
Daily Charges:
Time:
Date:
8.40 28
Cor Solids
%cP
Total Charges:
Rig Activity:
@
Current Pump & Flow Data:
Report For:
24 hr Max
96%
Ratio
Mud Data
Depth
Tools
Oil / Water
(lb/100ft 2)
PV
4.23
(lb/bbl) ml/30min Mud Type
8.40
WOB Condition TFA
Kill Mud
Bit # Size Hours Footage RPM
0
(current)
Units*
100% Gas In Air =10,000 Units
Type Comments
0
Background Trip Connection 0
(max)
-
Average 0
C-5i
0
C-1
0
0
0
0
C-3
Clyst
C-4i
Cement
Gas Summary
Cly Siltst
Chromatograph (ppm)
Sh Coal
Weight
Sd Lst
Avg
Alkal
Mud
Flow In (spm) Gallons/stroke
Lime
Tuff Gvl
API FL
C-5n C-4n
00
0 0
C-2
0
0
0 00
Minimum 0 0
Depth
Maximum
in
Set At
Ss Cht
26-Sep-2013
24:00:00
10148'
10148'
0'
Yesterday's Depth:
Current Depth:
24 Hour Progress:
ENI Petroleum AK-AM-0900765688
to
OP14-S3L1
Nikaitchuq
Oliktok Point
Depth
Grade
Nabors 245E
907-685-1490 Unit Phone:
0
E. Opitz
SPP (psi)
Report By: Logging Engineers: E. Opitz / C. Sinn
(max)
R/U Whipstock
Perry / Ruminer
Depth in / out
Max @ ft Avg
Casing
Summary
Size
Current
Bit Type
Flow In (gpm)
Lithology (%)
(current)
0
.
.
*
24 hr Recap:
Lithology (%)
(current)
724
Max @ ft Avg
Casing
Summary
Size
Current
Bit Type
Flow In (gpm)
Report By: Logging Engineers: E. Opitz / C. Sinn
(max)
Milling Window
Simonson / Ruminer
Depth in / out
33
Grade
Nabors 245E
907-685-1490 Unit Phone:
14
E. Opitz
SPP (psi)
ENI Petroleum AK-AM-0900765688
to
OP14-S3L1
Nikaitchuq
Oliktok Point
Depth
27-Sep-2013
24:00:00
10104'
10122'
18'
Yesterday's Depth:
Current Depth:
24 Hour Progress:
Depth
Maximum
in
1
Set At
Ss Cht
10107'2730
Minimum 105 9
76 77
C-2
25
5
C-5n C-4n
00
64 30
Flow In (spm) Gallons/stroke
Lime
Tuff Gvl
API FL
Avg
16
Alkal
Mud
- 2.30 2.99
Coal
Weight
Sd Lst Siltst
15
Chromatograph (ppm)
Sh Cement
Gas Summary
Cly
C-3
Clyst
C-4i
62
C-1
26
12
24
10
C-5i
Average 13
626
(max)
-8Background Trip Connection 100% Gas In Air =10,000 Units
Type Comments
20 5
(current)
Units*
Size Hours Footage RPM Condition
10.0
TFA
FazePro 10111'
Bit #
4.23
(lb/bbl) ml/30min Mud Type
8.65
WOB
Ratio
Mud Data
Depth
Tools
Oil / Water
(lb/100ft 2)
PV
Total Charges:
Rig Activity:
@
Current Pump & Flow Data:
Report For:
24 hr Max
96%
8.70 61
Cor Solids
%cP
62/38
Morning Report Report # 09
Customer:
Well:
Area:
Location:
Rig:
Job No.:
Daily Charges:
Time:
Date:
ROP
MWD Summary
out (sec/qt)
ROP (ft/hr)
Min
YP
Max ECD (ppg)
Density (ppg) Viscosity
RIH with whipstock BHA. TIH to bottom and begin to orientate whipstock at 10144' MD. Set whipstock at 10121' MD.
Displace to FazePro OBM. Begin milling window.
11
.
.
*
24 hr Recap:
ring, and prepare to test BOPs.
17
Finish milling window, and polish window per Baker rep. Pump sweeps. TOOH and L/D milling BHA. Pull wear
ROP (ft/hr)
Min
YP
Max ECD (ppg)
Density (ppg) Viscosity
out (sec/qt)
ROP
MWD Summary
Morning Report Report # 10
Customer:
Well:
Area:
Location:
Rig:
Job No.:
Daily Charges:
Time:
Date:
8.70 60
Cor Solids
%cP
64/36
Total Charges:
Rig Activity:
@
Current Pump & Flow Data:
Report For:
24 hr Max
96%
Ratio
Mud Data
Depth
Tools
Oil / Water
(lb/100ft 2)
PV
4.23
(lb/bbl) ml/30min Mud Type
WOB Condition
10.0
TFA
FazePro 10150'
Bit # Size Hours Footage RPM
3
(current)
Units*
100% Gas In Air =10,000 Units
Type Comments
7
-Background Trip Connection -
(max)
-
Average 9
C-5i
13
C-1
14
8
11
6
C-3
Clyst
C-4i
Cement
Gas Summary
Cly Siltst
16
Chromatograph (ppm)
Sh Coal
Weight
Sd Lst
Avg
15
Alkal
Mud
6.5 1.90 2.47
Flow In (spm) Gallons/stroke
Lime
Tuff Gvl
API FL
C-5n C-4n
00
15 10
C-2
8
0
12 10 2242
Minimum 793 4
Depth
Maximum
in
10
Set At
Ss Cht
10136'
28-Sep-2013
24:00:00
10122'
10150'
28'
Yesterday's Depth:
Current Depth:
24 Hour Progress:
ENI Petroleum AK-AM-0900765688
to
OP14-S3L1
Nikaitchuq
Oliktok Point
Depth
25
Grade
Nabors 245E
907-685-1490 Unit Phone:
5
E. Opitz
SPP (psi)
Report By: Logging Engineers: E. Opitz / C. Sinn
(max)
Testing BOPs
Simonson / Ruminer
Depth in / out
Max @ ft Avg
Casing
Summary
Size
Current
Bit Type
Flow In (gpm)
Lithology (%)
(current)
1396
10149'
.
.
*
24 hr Recap:
Lithology (%)
0.746
(current)
13235
10158'
Max @ ft
10319'
Avg
Casing
Summary
Size
Current
Bit Type
Flow In (gpm)
Report By: Logging Engineers: E. Opitz / C. Sinn
(max)
BROOH
Simonson / Ruminer
Depth in / out
292
Grade
Nabors 245E
907-685-1490 Unit Phone:
0
E. Opitz
SPP (psi)
ENI Petroleum AK-AM-0900765688
to 10150' 10465'
Mill Tooth XR+
OP14-S3L1
Nikaitchuq
Oliktok Point
Depth
29-Sep-2013
24:00:00
10150'
10465'
315'
Yesterday's Depth:
Current Depth:
24 Hour Progress:
Depth
Maximum
in
12
Set At
Ss Cht
10324'38452
Minimum 809 0
139 27
C-2
8
0
C-5n C-4n
00
14 8
Flow In (spm) Gallons/stroke
Lime
Tuff Gvl
106
API FL
Avg
19
Alkal
Mud
6.0 1.90 2.47
Coal
Weight
Sd Lst Siltst
24
Chromatograph (ppm)
Sh
70
Cement
Gas Summary
Cly
C-3
Clyst
C-4i
14
C-1
7
0
6
0
C-5i
30
Average 3
-
(max)
-72 Background Trip Connection 100% Gas In Air =10,000 Units
Type Comments
47 0
(current)
Units*
Size Hours Footage RPM Condition
10.7
1 8.75 10150'
TFA
FazePro 10340'
Bit #
4.23
(lb/bbl) ml/30min Mud Type
TeleScope
8.75
WOB
Ratio
Mud Data
Depth
Tools
Oil / Water
(lb/100ft 2)
447
PV
Total Charges:
Rig Activity:
@
Current Pump & Flow Data:
Report For:
24 hr Max
96%
8.75 67
Cor Solids
%cP
66/34
Morning Report Report # 11
Customer:
Well:
Area:
Location:
Rig:
Job No.:
Daily Charges:
Time:
Date:
ROP
MWD Summary
1976
out (sec/qt)
ROP (ft/hr)
Min
YP
Max ECD (ppg)
Density (ppg) Viscosity
158.9
Finish testing BOPs. P/U BHA #1 and RIH. Drill/slide ahead with 1.83* motor per Geo and DD to 10465' MD.
increases in gas.
Spot samples show varying amounts of Siltstone/Shale, with increasing percentages of unconsolidated sands that coorelate with
BROOH per K&M.
115
.
.
*
24 hr Recap:
BROOH per K&M. Monitor well, and then TOOH. L/D BHA #1. P/U BHA #2 and TIH.
ROP (ft/hr)
Min
YP
Max ECD (ppg)
Density (ppg) Viscosity
out (sec/qt)
ROP
MWD Summary
Morning Report Report # 12
Customer:
Well:
Area:
Location:
Rig:
Job No.:
Daily Charges:
Time:
Date:
8.75 67
Cor Solids
%cP
66/34
Total Charges:
Rig Activity:
@
Current Pump & Flow Data:
Report For:
24 hr Max
96%
Ratio
Mud Data
Depth
Tools
Oil / Water
(lb/100ft 2)
PV
2
4.23
(lb/bbl) ml/30min Mud Type
Xceed 675, PeriScope 675, TeleScope 675
8.75
10465'
WOB Condition
1-1-WT-A-E-I-NO-BHA
10.7
1 8.75 10150'
TFA
FazePro 10340'
Bit #
315' 40.0 5.50
Size
Hycalog SKH616M-E1D
Hours Footage RPM
0
(current)
Units*
100% Gas In Air =10,000 Units
Type Comments
0
-Background Trip Connection 98
(max)
-
Average 0
C-5i
0
C-1
0
0
0
0
C-3
Clyst
C-4i
Cement
Gas Summary
Cly Siltst
10.0
24
Chromatograph (ppm)
Sh
8.75 0.902
Coal
Weight
Sd Lst
10465'
Avg
19
Alkal
Mud
6.0 1.90 2.47
Flow In (spm) Gallons/stroke
Lime
Tuff Gvl
API FL
C-5n C-4n
00
0 0
C-2
0
0
0 00
Minimum 0 0
Depth
Maximum
in
Set At
Ss Cht
30-Sep-2013
24:00:00
10465'
10465'
0'
Yesterday's Depth:
Current Depth:
24 Hour Progress:
ENI Petroleum AK-AM-0900765688
to 10465' 10465'
Mill Tooth XR+
OP14-S3L1
Nikaitchuq
Oliktok Point
Depth
Grade
Nabors 245E
907-685-1490 Unit Phone:
0
E. Opitz
SPP (psi)
Report By: Logging Engineers: E. Opitz / C. Sinn
(max)
TIH w/ BHA #2
Simonson / Ruminer
Depth in / out
Max @ ft Avg
Casing
Summary
Size
Current
Bit Type
Flow In (gpm)
Lithology (%)
0.746
(current)
0
.
.
*
24 hr Recap:
9 5/8" 47.0
Lithology (%)
0.746
(current)
48057
10470'
Max @ ft
11204'
Avg
Casing
Summary
Size
Current
Bit Type
Flow In (gpm)
Report By: Logging Engineers: E. Opitz / C. Sinn
(max)
Drilling Ahead
Simonson / Sherman
Depth in / out
1626
Grade
Nabors 245E
907-685-1490 Unit Phone:
28
E. Opitz
L-80
SPP (psi)
ENI Petroleum AK-AM-0900765688
to 10465' 11353'
Mill Tooth XR+
OP14-S3L1
Nikaitchuq
Oliktok Point
Depth
1-Oct-2013
24:00:00
10465'
11353'
888'
Yesterday's Depth:
Current Depth:
24 Hour Progress:
Depth
Maximum
in
41
Set At
Ss Cht
11144'184310
Minimum 4014 0
703 165
C-2
46
11
C-5n C-4n
00
96 55
Flow In (spm) Gallons/stroke
Lime
Tuff Gvl
102
API FL
Avg
18
Alkal
Mud
5.2 2.15 2.80
8.75 0.902
Coal
Weight
Sd Lst
10465'
Siltst
10.0
24
Chromatograph (ppm)
Sh Cement
Gas Summary
Cly
C-3
Clyst
C-4i
98
C-1
30
3
30
0
C-5i
Average 17
25
(max)
203 85 Background Trip Connection 100% Gas In Air =10,000 Units
Type Comments
193
Window milled @ 10104' MD
9
10440' Hydril 563
(current)
Units*
315' 40.0 5.50
Size
Hycalog SKH616M-E1D
Hours Footage RPM Condition
1-1-WT-A-E-I-NO-BHA
8.5
1 8.75 10150'
TFA
FazePro 11190'
Bit #
2
4.23
(lb/bbl) ml/30min Mud Type
Xceed 675, PeriScope 675, TeleScope 675
8.70
10465'
WOB
172.2
Ratio
Mud Data
Depth
Tools
Oil / Water
(lb/100ft 2)
449
PV
133.0
Total Charges:
Rig Activity:
@
Current Pump & Flow Data:
Report For:
24 hr Max
96%
8.75 65
Cor Solids
%cP
67/33
Morning Report Report # 13
Customer:
Well:
Area:
Location:
Rig:
Job No.:
Daily Charges:
Time:
Date:
ROP
MWD Summary
2021
out (sec/qt)
ROP (ft/hr)
Min
YP
Max ECD (ppg)
Density (ppg) Viscosity
293.3
TIH to 10055' MD. Slip & Cut. MAD pass logs on previously drilled open hole for build section of production hole -
from 10050' to 10465' MD. Begin drilling ahead production hole.
450
.
.
*
24 hr Recap:
767
Continue drilling ahead in production hole. Monitoring losses while drilling.
ROP (ft/hr)
Min
YP
Max ECD (ppg)
Density (ppg) Viscosity
491.5 2225
out (sec/qt)
ROP
MWD Summary
Morning Report Report # 14
Customer:
Well:
Area:
Location:
Rig:
Job No.:
Daily Charges:
Time:
Date:
8.70 52
Cor Solids
%
12.29
cP
71/29
10.29
161.0
Total Charges:
Rig Activity:
@
Current Pump & Flow Data:
Report For:
24 hr Max
96%
203.1
Ratio
Mud Data
Depth
Tools
Oil / Water
(lb/100ft 2)
452
PV
2
4.23
(lb/bbl) ml/30min Mud Type
Xceed 675, PeriScope 675, TeleScope 675
8.70
10465'
WOB Condition
1-1-WT-A-E-I-NO-BHA
9.7
1 8.75 10150'
TFA
FazePro 12700'
Bit #
315' 40.0 5.50
Size
Hycalog SKH616M-E1D
Hours Footage RPM
27
10440' Hydril 563
(current)
Units*
100% Gas In Air =10,000 Units
Type Comments
376
Top of Window milled @ 10102' MD
64 Background Trip Connection -
(max)
217
Average 49
C-5i
123
C-1
79
34
78
30
C-3
Clyst
C-4i
Cement
Gas Summary
Cly Siltst
10.0
17
Chromatograph (ppm)
Sh
8.75 0.902
Coal
Weight
Sd Lst
10465'
Avg
14
Alkal
Mud
5.2 2.10 2.73
8.99
Flow In (spm) Gallons/stroke
Lime
Tuff Gvl
107
API FL
C-5n C-4n
16 30
121 71
C-2
108
39
818 194 225975
Minimum 4268 22
Depth
Maximum
in
39
Set At
Ss Cht
11623'
2-Oct-2013
24:00:00
11353'
13020'
1667'
Yesterday's Depth:
Current Depth:
24 Hour Progress:
ENI Petroleum AK-AM-0900765688
to 11353' 13020'
Mill Tooth XR+
OP14-S3L1
Nikaitchuq
Oliktok Point
Depth
2049
Grade
Nabors 245E
907-685-1490 Unit Phone:
37
E. Opitz
L-80
SPP (psi)
Report By: Logging Engineers: E. Opitz / C. Sinn
(max)
Drilling Ahead
Simonson / Sherman
Depth in / out
Max @ ft
11683'
Avg
Casing
Summary
Size
Current
Bit Type
Flow In (gpm)
9 5/8" 47.0
Lithology (%)
0.746
(current)
83412
12141'
.
.
*
24 hr Recap:
9 5/8" 47.0
Lithology (%)
0.746
(current)
66323
14153'
Max @ ft
13022'
Avg
Casing
Summary
Size
Current
Bit Type
Flow In (gpm)
Report By: Logging Engineers: E. Opitz / C. Sinn
(max)
Drilling Ahead
Simonson / Sherman
Depth in / out
1182
Grade
Nabors 245E
907-685-1490 Unit Phone:
42
E. Opitz
L-80
SPP (psi)
ENI Petroleum AK-AM-0900765688
to 13020' 14173'
Mill Tooth XR+
OP14-S3L1
Nikaitchuq
Oliktok Point
Depth
3-Oct-2013
24:00:00
13020'
14173'
1153'
Yesterday's Depth:
Current Depth:
24 Hour Progress:
Depth
Maximum
in
179
Set At
Ss Cht
13070'136087
Minimum 21574 71
722 230
C-2
134
141
C-5n C-4n
29 49
144 79
Flow In (spm) Gallons/stroke
Lime
Tuff Gvl
94
API FL
Avg
13
Alkal
Mud
4.0 1.80 2.34
9.53
8.75 0.902
Coal
Weight
Sd Lst
10465'
Siltst
10.0
15
Chromatograph (ppm)
Sh Cement
Gas Summary
Cly
C-3
Clyst
C-4i
146
C-1
95
71
93
64
C-5i
Average 57
-
(max)
78 134 Background Trip Connection 100% Gas In Air =10,000 Units
Type Comments
367
Top of Window milled @ 10102' MD
32
10440' Hydril 563
(current)
Units*
315' 40.0 5.50
Size
Hycalog SKH616M-E1D
Hours Footage RPM Condition
1-1-WT-A-E-I-NO-BHA
8.7
1 8.75 10150'
TFA
FazePro 13945'
Bit #
2
4.23
(lb/bbl) ml/30min Mud Type
Xceed 675, PeriScope 675, TeleScope 675
8.70
10465'
WOB
138.8
Ratio
Mud Data
Depth
Tools
Oil / Water
(lb/100ft 2)
392
PV
146.0
Total Charges:
Rig Activity:
@
Current Pump & Flow Data:
Report For:
24 hr Max
96%
8.70 52
Cor Solids
%
10.39
cP
68/32
10.14
Morning Report Report # 15
Customer:
Well:
Area:
Location:
Rig:
Job No.:
Daily Charges:
Time:
Date:
ROP
MWD Summary
1836
out (sec/qt)
ROP (ft/hr)
Min
YP
Max ECD (ppg)
Density (ppg) Viscosity
276.6
Continue drilling ahead in production hole, monitoring losses while drilling. At 13119, losses of 80+ bbl/hr while
noticed.
waiting on mud trucks to deliver more drilling fluid. After receiving fluid, resume drilling ahead with losses between 10-20 bbl/hr
circulating, and losses of 36 bbl/hr static. Insufficient drilling fluid on location to drill ahead. Circulate and reciprocate pipe while
585
.
.
*
24 hr Recap:
494
Continue drilling ahead in production section.
ROP (ft/hr)
Min
YP
Max ECD (ppg)
Density (ppg) Viscosity
290.8 2221
out (sec/qt)
ROP
MWD Summary
Morning Report Report # 16
Customer:
Well:
Area:
Location:
Rig:
Job No.:
Daily Charges:
Time:
Date:
8.65 52
Cor Solids
%
10.44
cP
70/30
10.26
93.0
Total Charges:
Rig Activity:
@
Current Pump & Flow Data:
Report For:
24 hr Max
96%
168.5
Ratio
Mud Data
Depth
Tools
Oil / Water
(lb/100ft 2)
444
PV
2
4.23
(lb/bbl) ml/30min Mud Type
Xceed 675, PeriScope 675, TeleScope 675
8.65
10465'
WOB Condition
1-1-WT-A-E-I-NO-BHA
14.0
1 8.75 10150'
TFA
FazePro 15283'
Bit #
315' 40.0 5.50
Size
Hycalog SKH616M-E1D
Hours Footage RPM
38
10440' Hydril 563
(current)
Units*
100% Gas In Air =10,000 Units
Type Comments
309
Top of Window milled @ 10102' MD
54 Background Trip Connection -
(max)
78
Average 68
C-5i
186
C-1
109
49
103
41
C-3
Clyst
C-4i
Cement
Gas Summary
Cly Siltst
10.0
15
Chromatograph (ppm)
Sh
8.75 0.902
Coal
Weight
Sd Lst
10465'
Avg
13
Alkal
Mud
5.4 2.00 2.60
9.43
Flow In (spm) Gallons/stroke
Lime
Tuff Gvl
106
API FL
C-5n C-4n
23 40
186 104
C-2
142
37
739 311 132679
Minimum 3320 37
Depth
Maximum
in
39
Set At
Ss Cht
15197'
4-Oct-2013
24:00:00
14173'
15417'
1244'
Yesterday's Depth:
Current Depth:
24 Hour Progress:
ENI Petroleum AK-AM-0900765688
to 14173' 15417'
Mill Tooth XR+
OP14-S3L1
Nikaitchuq
Oliktok Point
Depth
1183
Grade
Nabors 245E
907-685-1490 Unit Phone:
57
E. Opitz
L-80
SPP (psi)
Report By: Logging Engineers: E. Opitz / C. Sinn
(max)
Drilling Ahead
Simonson / Sherman
Depth in / out
Max @ ft
14652'
Avg
Casing
Summary
Size
Current
Bit Type
Flow In (gpm)
9 5/8" 47.0
Lithology (%)
0.746
(current)
50116
15326'
.
.
*
24 hr Recap:
9 5/8" 47.0
Lithology (%)
0.746
(current)
52922
16436'
Max @ ft
15524'
Avg
Casing
Summary
Size
Current
Bit Type
Flow In (gpm)
Report By: Logging Engineers: E. Opitz / C. Sinn
(max)
Drilling Ahead
Simonson / Sherman
Depth in / out
928
Grade
Nabors 245E
907-685-1490 Unit Phone:
51
E. Opitz
L-80
SPP (psi)
ENI Petroleum AK-AM-0900765688
to 15417' 17044'
Mill Tooth XR+
OP14-S3L1
Nikaitchuq
Oliktok Point
Depth
5-Oct-2013
24:00:00
15417'
17044'
1627'
Yesterday's Depth:
Current Depth:
24 Hour Progress:
Depth
Maximum
in
66
Set At
Ss Cht
15633'108523
Minimum 5903 48
608 257
C-2
143
65
C-5n C-4n
25 43
170 93
Flow In (spm) Gallons/stroke
Lime
Tuff Gvl
111
API FL
Avg
14
Alkal
Mud
4.8 2.00 2.60
9.85
8.75 0.902
Coal
Weight
Sd Lst
10465'
Siltst
10.0
14
Chromatograph (ppm)
Sh Cement
Gas Summary
Cly
C-3
Clyst
C-4i
162
C-1
112
56
106
51
C-5i
Average 71
-
(max)
-71 Background Trip Connection 100% Gas In Air =10,000 Units
Type Comments
318
Top of Window milled @ 10102' MD
39
10440' Hydril 563
(current)
Units*
315' 40.0 5.50
Size
Hycalog SKH616M-E1D
Hours Footage RPM Condition
1-1-WT-A-E-I-NO-BHA
8.8
1 8.75 10150'
TFA
FazePro 16800'
Bit #
2
4.23
(lb/bbl) ml/30min Mud Type
Xceed 675, PeriScope 675, TeleScope 675
8.70
10465'
WOB
166.1
Ratio
Mud Data
Depth
Tools
Oil / Water
(lb/100ft 2)
465
PV
181.0
Total Charges:
Rig Activity:
@
Current Pump & Flow Data:
Report For:
24 hr Max
96%
8.70 52
Cor Solids
%
10.76
cP
71/29
10.53
Morning Report Report # 17
Customer:
Well:
Area:
Location:
Rig:
Job No.:
Daily Charges:
Time:
Date:
ROP
MWD Summary
2592
out (sec/qt)
ROP (ft/hr)
Min
YP
Max ECD (ppg)
Density (ppg) Viscosity
284.6
Continue drilling ahead in production section.
512
.
.
*
24 hr Recap:
398
Continue drilling ahead in production section.
ROP (ft/hr)
Min
YP
Max ECD (ppg)
Density (ppg) Viscosity
261.8 2933
out (sec/qt)
ROP
MWD Summary
Morning Report Report # 18
Customer:
Well:
Area:
Location:
Rig:
Job No.:
Daily Charges:
Time:
Date:
8.65 53
Cor Solids
%
10.91
cP
72/28
10.69
148.0
Total Charges:
Rig Activity:
@
Current Pump & Flow Data:
Report For:
24 hr Max
96%
159.5
Ratio
Mud Data
Depth
Tools
Oil / Water
(lb/100ft 2)
498
PV
2
4.23
(lb/bbl) ml/30min Mud Type
Xceed 675, PeriScope 675, TeleScope 675
8.65
10465'
WOB Condition
1-1-WT-A-E-I-NO-BHA
9.6
1 8.75 10150'
TFA
FazePro 18189'
Bit #
315' 40.0 5.50
Size
Hycalog SKH616M-E1D
Hours Footage RPM
39
10440' Hydril 563
(current)
Units*
100% Gas In Air =10,000 Units
Type Comments
252
Top of Window milled @ 10102' MD
94 Background Trip Connection -
(max)
-
Average 71
C-5i
176
C-1
110
65
101
60
C-3
Clyst
C-4i
Cement
Gas Summary
Cly Siltst
10.0
16
Chromatograph (ppm)
Sh
8.75 0.902
Coal
Weight
Sd Lst
10465'
Avg
13
Alkal
Mud
5.1 1.90 2.47
10.34
Flow In (spm) Gallons/stroke
Lime
Tuff Gvl
119
API FL
C-5n C-4n
28 49
192 107
C-2
127
78
508 247 96288
Minimum 8153 57
Depth
Maximum
in
92
Set At
Ss Cht
17820'
6-Oct-2013
24:00:00
17044'
18289'
1245'
Yesterday's Depth:
Current Depth:
24 Hour Progress:
ENI Petroleum AK-AM-0900765688
to 17044' 18289'
Mill Tooth XR+
OP14-S3L1
Nikaitchuq
Oliktok Point
Depth
824
Grade
Nabors 245E
907-685-1490 Unit Phone:
57
E. Opitz
L-80
SPP (psi)
Report By: Logging Engineers: E. Opitz / J. Failing
(max)
Drilling Ahead
Simonson / Sherman
Depth in / out
Max @ ft
17237'
Avg
Casing
Summary
Size
Current
Bit Type
Flow In (gpm)
9 5/8" 47.0
Lithology (%)
0.746
(current)
44640
17935'
.
.
*
24 hr Recap:
9 5/8" 47.0
Lithology (%)
0.746
(current)
50420
19480'
Max @ ft
19262'
Avg
Casing
Summary
Size
Current
Bit Type
Flow In (gpm)
Report By: Logging Engineers: E. Opitz / J. Failing
(max)
BROOH 10 stands
Simonson / Sherman
Depth in / out
823
Grade
Nabors 245E
907-685-1490 Unit Phone:
63
E. Opitz
L-80
SPP (psi)
ENI Petroleum AK-AM-0900765688
to 18289' 19821'
Mill Tooth XR+
OP14-S3L1
Nikaitchuq
Oliktok Point
Depth
7-Oct-2013
24:00:00
18289'
19821'
1532'
Yesterday's Depth:
Current Depth:
24 Hour Progress:
Depth
Maximum
in
54
Set At
Ss Cht
19766'92276
Minimum 4359 52
556 289
C-2
173
50
C-5n C-4n
31 53
207 119
Flow In (spm) Gallons/stroke
Lime
Tuff Gvl
117
API FL
Avg
14
Alkal
Mud
5.2 1.80 2.34
10.62
8.75 0.902
Coal
Weight
Sd Lst
10465'
Siltst
10.0
17
Chromatograph (ppm)
Sh Cement
Gas Summary
Cly
C-3
Clyst
C-4i
194
C-1
142
68
129
56
C-5i
Average 87
-
(max)
-47 Background Trip Connection 100% Gas In Air =10,000 Units
Type Comments
310
Top of Window milled @ 10102' MD
47
10440' Hydril 563
(current)
Units*
315' 40.0 5.50
Size
Hycalog SKH616M-E1D
Hours Footage RPM Condition
1-1-WT-A-E-I-NO-BHA
8.6
1 8.75 10150'
TFA
FazePro 19524'
Bit #
2
4.23
(lb/bbl) ml/30min Mud Type
Xceed 675, PeriScope 675, TeleScope 675
8.70
10465'
WOB
170.6
Ratio
Mud Data
Depth
Tools
Oil / Water
(lb/100ft 2)
490
PV
Total Charges:
Rig Activity:
@
Current Pump & Flow Data:
Report For:
24 hr Max
96%
8.70 53
Cor Solids
%
11.19
cP
71/29
10.91
Morning Report Report # 19
Customer:
Well:
Area:
Location:
Rig:
Job No.:
Daily Charges:
Time:
Date:
ROP
MWD Summary
3113
out (sec/qt)
ROP (ft/hr)
Min
YP
Max ECD (ppg)
Density (ppg) Viscosity
246.2
Continue drilling ahead in production section through stand #99 to a depth of 19821' MD at midnight.
507
.
.
*
24 hr Recap:
1115 hrs. Continue drilling ahead in production section.
395
BROOH 10 stands per K&M. Pick up 30 5" DP joints, and stand back. RIH back to bottom and resume drilling @
ROP (ft/hr)
Min
YP
Max ECD (ppg)
Density (ppg) Viscosity
238.7 3056
out (sec/qt)
ROP
MWD Summary
Morning Report Report # 20
Customer:
Well:
Area:
Location:
Rig:
Job No.:
Daily Charges:
Time:
Date:
8.75 53
Cor Solids
%
11.32
cP
70/30
11.12
149.0
Total Charges:
Rig Activity:
@
Current Pump & Flow Data:
Report For:
24 hr Max
96%
141.6
Ratio
Mud Data
Depth
Tools
Oil / Water
(lb/100ft 2)
473
PV
2
4.23
(lb/bbl) ml/30min Mud Type
Xceed 675, PeriScope 675, TeleScope 675
8.70
10465'
WOB Condition
1-1-WT-A-E-I-NO-BHA
8.5
1 8.75 10150'
TFA
FazePro 20273'
Bit #
315' 40.0 5.50
Size
Hycalog SKH616M-E1D
Hours Footage RPM
31
10440' Hydril 563
(current)
Units*
100% Gas In Air =10,000 Units
Type Comments
218
Top of Window milled @ 10102' MD
51 Background Trip Connection -
(max)
-
Average 57
C-5i
154
C-1
89
28
83
22
C-3
Clyst
C-4i
Cement
Gas Summary
Cly Siltst
10.0
17
Chromatograph (ppm)
Sh
8.75 0.902
Coal
Weight
Sd Lst
10465'
Avg
14
Alkal
Mud
5.4 2.05 2.67
10.79
Flow In (spm) Gallons/stroke
Lime
Tuff Gvl
113
API FL
C-5n C-4n
16 27
160 90
C-2
115
17
501 241 83403
Minimum 3040 17
Depth
Maximum
in
37
Set At
Ss Cht
19884'
8-Oct-2013
24:00:00
19821'
20421'
600'
Yesterday's Depth:
Current Depth:
24 Hour Progress:
ENI Petroleum AK-AM-0900765688
to 19821' 20421'
Mill Tooth XR+
OP14-S3L1
Nikaitchuq
Oliktok Point
Depth
713
Grade
Nabors 245E
907-685-1490 Unit Phone:
48
E. Opitz
L-80
SPP (psi)
Report By: Logging Engineers: E. Opitz / J. Failing
(max)
Drilling Ahead
Simonson / Sherman
Depth in / out
Max @ ft
19824'
Avg
Casing
Summary
Size
Current
Bit Type
Flow In (gpm)
9 5/8" 47.0
Lithology (%)
0.746
(current)
35413
20258'
.
*
24 hr Recap:
9 5/8" 47.0
Lithology (%)
0.746
(current)
40646
20796'
Max @ ft
21094'
Avg
Casing
Summary
Size
Current
Bit Type
Flow In (gpm)
Report By: Logging Engineers: E. Opitz / J. Failing
(max)
BROOH
Simonson / Sherman
Depth in / out
842
Grade
Nabors 245E
907-685-1490 Unit Phone:
58
E. Opitz
L-80
SPP (psi)
ENI Petroleum AK-AM-0900765688
to 20421' 21371'
Mill Tooth XR+
OP14-S3L1
Nikaitchuq
Oliktok Point
Depth
9-Oct-2013
24:00:00
20421'
21371'
950'
Yesterday's Depth:
Current Depth:
24 Hour Progress:
Depth
Maximum
in
51
Set At
Ss Cht
21104'97049
Minimum 4430 34
619 309
C-2
143
41
C-5n C-4n
19 32
206 109
Flow In (spm) Gallons/stroke
Lime
Tuff Gvl
117
API FL
Avg
14
Alkal
Mud
5.4 1.80 2.34
9.71
8.75 0.902
Coal
Weight
Sd Lst
10465'
Siltst
10.0
16
Chromatograph (ppm)
Sh Cement
Gas Summary
Cly
C-3
Clyst
C-4i
198
C-1
106
41
101
36
C-5i
Average 64
162
(max)
-44 Background Trip Connection 100% Gas In Air =10,000 Units
Type Comments
267
Top of Window milled @ 10102' MD
35
10440' Hydril 563
(current)
Units*
315' 40.0 5.50
Size
Hycalog SKH616M-E1D
Hours Footage RPM Condition
1-1-WT-A-E-I-NO-BHA
9.0
1 8.75 10150'
TFA
FazePro 21371'
Bit #
2
4.23
(lb/bbl) ml/30min Mud Type
Xceed 675, PeriScope 675, TeleScope 675
8.65
10465'
WOB
170.0
Ratio
Mud Data
Depth
Tools
Oil / Water
(lb/100ft 2)
490
PV
Total Charges:
Rig Activity:
@
Current Pump & Flow Data:
Report For:
24 hr Max
96%
8.65 53
Cor Solids
%
11.58
cP
70/30
11.32
Morning Report Report # 21
Customer:
Well:
Area:
Location:
Rig:
Job No.:
Daily Charges:
Time:
Date:
ROP
MWD Summary
3108
out (sec/qt)
ROP (ft/hr)
Min
YP
Max ECD (ppg)
Density (ppg) Viscosity
245.5
Drill ahead to production TD of 21371' MD. BROOH per K&M. Currently at 20500' MD at report time.
377
.
*
24 hr Recap: BROOH per K&M. At 10600' MD at report time.
ROP (ft/hr)
Min
YP
Max ECD (ppg)
Density (ppg) Viscosity
2197
out (sec/qt)
ROP
MWD Summary
Morning Report Report # 22
Customer:
Well:
Area:
Location:
Rig:
Job No.:
Daily Charges:
Time:
Date:
8.70 54
Cor Solids
%cP
69/31
Total Charges:
Rig Activity:
@
Current Pump & Flow Data:
Report For:
24 hr Max
96%
Ratio
Mud Data
Depth
Tools
Oil / Water
(lb/100ft 2)
488
PV
2
4.23
(lb/bbl) ml/30min Mud Type
Xceed 675, PeriScope 675, TeleScope 675
8.70
10465'
WOB Condition
1-1-WT-A-E-I-NO-BHA
7.6
1 8.75 10150'
TFA
FazePro 21371'
Bit #
315' 40.0 5.50
Size
Hycalog SKH616M-E1D
Hours Footage RPM
0
10440' Hydril 563
(current)
Units*
100% Gas In Air =10,000 Units
Type Comments
0
Top of Window milled @ 10102' MD
17 Background Trip Connection 81
(max)
-
Average 0
C-5i
0
C-1
0
0
0
0
C-3
Clyst
C-4i
Cement
Gas Summary
Cly Siltst
10.0
15
Chromatograph (ppm)
Sh
8.75 0.902
Coal
Weight
Sd Lst
10465'
Avg
13
Alkal
Mud
5.4 2.00 2.60
Flow In (spm) Gallons/stroke
Lime
Tuff Gvl
116
API FL
C-5n C-4n
00
0 0
C-2
0
0
0 00
Minimum 0 0
Depth
Maximum
in
Set At
Ss Cht
10-Oct-2013
24:00:00
21371'
21371'
0'
Yesterday's Depth:
Current Depth:
24 Hour Progress:
ENI Petroleum AK-AM-0900765688
to 21371' 21371'
Mill Tooth XR+
OP14-S3L1
Nikaitchuq
Oliktok Point
Depth
Grade
Nabors 245E
907-685-1490 Unit Phone:
0
E. Opitz
L-80
SPP (psi)
Report By: Logging Engineers: E. Opitz / J. Failing
(max)
BROOH
Simonson / Sherman
Depth in / out
Max @ ft Avg
Casing
Summary
Size
Current
Bit Type
Flow In (gpm)
9 5/8" 47.0
Lithology (%)
0.746
(current)
0
.
*
24 hr Recap:
9 5/8" 47.0
Lithology (%)
0.746
(current)
0
Max @ ft Avg
Casing
Summary
Size
Current
Bit Type
Flow In (gpm)
Report By: Logging Engineers: E. Opitz / J. Failing
(max)
Test BOPs
Simonson / Sherman
Depth in / out
Grade
Nabors 245E
907-685-1490 Unit Phone:
0
E. Opitz
L-80
SPP (psi)
ENI Petroleum AK-AM-0900765688
to 21371' 21371'
Mill Tooth XR+
OP14-S3L1
Nikaitchuq
Oliktok Point
Depth
11-Oct-2013
24:00:00
21371'
21371'
0'
Yesterday's Depth:
Current Depth:
24 Hour Progress:
Depth
Maximum
in
Set At
Ss Cht
0
Minimum 0 0
0 0
C-2
0
0
C-5n C-4n
00
0 0
Flow In (spm) Gallons/stroke
Lime
Tuff Gvl
API FL
Avg
14
Alkal
Mud
5.2 2.00 2.60
8.75 0.902
Coal
Weight
Sd Lst
10465'
Siltst
10.0
16
Chromatograph (ppm)
Sh Cement
Gas Summary
Cly
C-3
Clyst
C-4i
0
C-1
0
0
0
0
C-5i
Average 0
(max)
-Background Trip Connection 100% Gas In Air =10,000 Units
Type Comments
0
Top of Window milled @ 10102' MD
0
10440' Hydril 563
(current)
Units*
315' 40.0 5.50
Size
Hycalog SKH616M-E1D
Hours Footage RPM Condition
1-1-WT-A-E-I-NO-BHA
7.6
1 8.75 10150'
TFA
FazePro 21371'
Bit #
2
4.23
(lb/bbl) ml/30min Mud Type
8.70
10465'
WOB
Ratio
Mud Data
Depth
Tools
Oil / Water
(lb/100ft 2)
PV
Total Charges:
Rig Activity:
@
Current Pump & Flow Data:
Report For:
24 hr Max
96%
8.70 56
Cor Solids
%cP
69/31
Morning Report Report # 23
Customer:
Well:
Area:
Location:
Rig:
Job No.:
Daily Charges:
Time:
Date:
ROP
MWD Summary
out (sec/qt)
ROP (ft/hr)
Min
YP
Max ECD (ppg)
Density (ppg) Viscosity
BROOH to 10341' MD, and then TOOH through window to 10055' MD. CBU 3x. POOH and L/D BHA. R/U begin to
test BOPs.
.
*
24 hr Recap:
Finish BOP testing. P/U BHA with whipstock retrieval tool and RIH. Retrieve whipstock and TOOH.
ROP (ft/hr)
Min
YP
Max ECD (ppg)
Density (ppg) Viscosity
out (sec/qt)
ROP
MWD Summary
Morning Report Report # 24
Customer:
Well:
Area:
Location:
Rig:
Job No.:
Daily Charges:
Time:
Date:
8.70 56
Cor Solids
%cP
69/31
Total Charges:
Rig Activity:
@
Current Pump & Flow Data:
Report For:
24 hr Max
96%
Ratio
Mud Data
Depth
Tools
Oil / Water
(lb/100ft 2)
PV
1-1-BT-N-X-I-NO-TD 2
4.23
(lb/bbl) ml/30min Mud Type
8.70
10465'
WOB Condition
1-1-WT-A-E-I-NO-BHA
7.6
1 8.75 10150'
TFA
FazePro 21371'
Bit #
315' 40.0 5.50
Size
Hycalog SKH616M-E1D
Hours
100.70
Footage RPM
0
10440' Hydril 563
(current)
Units*
100% Gas In Air =10,000 Units
Type Comments
0
Top of Window milled @ 10102' MD
Background Trip Connection
(max)
-
Average 0
C-5i
0
C-1
0
0
0
0
C-3
Clyst
C-4i
Cement
Gas Summary
Cly Siltst
10906' 5
10.0
16
Chromatograph (ppm)
Sh
8.75 0.902
Coal
Weight
Sd Lst
10465' 120
Avg
15
Alkal
Mud
5.3 2.00 2.60
Flow In (spm) Gallons/stroke
Lime
Tuff Gvl
API FL
C-5n C-4n
00
0 0
C-2
0
0
0 00
Minimum 0 0
Depth
Maximum
in
Set At
Ss Cht
12-Oct-2013
24:00:00
21371'
21371'
0'
Yesterday's Depth:
Current Depth:
24 Hour Progress:
ENI Petroleum AK-AM-0900765688
to 21371' 21371'
Mill Tooth XR+
OP14-S3L1
Nikaitchuq
Oliktok Point
Depth
Grade
Nabors 245E
907-685-1490 Unit Phone:
0
E. Opitz
L-80
SPP (psi)
Report By: Logging Engineers: E. Opitz / J. Failing
(max)
TOOH w/ whipstock
Simonson / Sherman
Depth in / out
Max @ ft Avg
Casing
Summary
Size
Current
Bit Type
21371'
Flow In (gpm)
9 5/8" 47.0
Lithology (%)
0.746
(current)
0
.
*
24 hr Recap:
9 5/8" 47.0
Lithology (%)
0.746
(current)
0
Max @ ft Avg
Casing
Summary
Size
Current
Bit Type
21371'
Flow In (gpm)
Report By: Logging Engineers: E. Opitz / J. Failing
(max)
RIH with Liner
Simonson / Sherman
Depth in / out
Grade
Nabors 245E
907-685-1490 Unit Phone:
0
E. Opitz
L-80
SPP (psi)
ENI Petroleum AK-AM-0900765688
to 21371' 21371'
Mill Tooth XR+
OP14-S3L1
Nikaitchuq
Oliktok Point
Depth
13-Oct-2013
24:00:00
21371'
21371'
0'
Yesterday's Depth:
Current Depth:
24 Hour Progress:
Depth
Maximum
in
Set At
Ss Cht
0
Minimum 0 0
0 0
C-2
0
0
C-5n C-4n
00
0 0
Flow In (spm) Gallons/stroke
Lime
Tuff Gvl
API FL
Avg
15
Alkal
Mud
5.5 2.00 2.60
8.75 0.902
Coal
Weight
Sd Lst
10465' 120
Siltst
10906' 5
10.0
17
Chromatograph (ppm)
Sh Cement
Gas Summary
Cly
C-3
Clyst
C-4i
0
C-1
0
0
0
0
C-5i
Average 0
-
(max)
--Background Trip Connection 100% Gas In Air =10,000 Units
Type Comments
0
Top of Window milled @ 10102' MD
0
10440' Hydril 563
(current)
Units*
315' 40.0 5.50
Size
Hycalog SKH616M-E1D
Hours
100.70
Footage RPM Condition
1-1-WT-A-E-I-NO-BHA
7.6
1 8.75 10150'
TFA
FazePro 21371'
Bit #
1-1-BT-N-X-I-NO-TD 2
4.23
(lb/bbl) ml/30min Mud Type
10465'
WOB
Ratio
Mud Data
Depth
Tools
Oil / Water
(lb/100ft 2)
PV
Total Charges:
Rig Activity:
@
Current Pump & Flow Data:
Report For:
24 hr Max
96%
8.70 57
Cor Solids
%cP
69/31
Morning Report Report # 25
Customer:
Well:
Area:
Location:
Rig:
Job No.:
Daily Charges:
Time:
Date:
ROP
MWD Summary
out (sec/qt)
ROP (ft/hr)
Min
YP
Max ECD (ppg)
Density (ppg) Viscosity
Finish TOOH with whipstock. L/D whipstock and retrieval BHA. R/U for liner run. RIH with 5.5" liner.
.
*
24 hr Recap:
Continue to RIH with 5.5" slotted liner.
ROP (ft/hr)
Min
YP
Max ECD (ppg)
Density (ppg) Viscosity
out (sec/qt)
ROP
MWD Summary
Morning Report Report # 26
Customer:
Well:
Area:
Location:
Rig:
Job No.:
Daily Charges:
Time:
Date:
8.70 57
Cor Solids
%cP
70/30
Total Charges:
Rig Activity:
@
Current Pump & Flow Data:
Report For:
24 hr Max
96%
Ratio
Mud Data
Depth
Tools
Oil / Water
(lb/100ft 2)
PV
1-1-BT-N-X-I-NO-TD 2
4.23
(lb/bbl) ml/30min Mud Type
10465'
WOB Condition
1-1-WT-A-E-I-NO-BHA
8.6
1 8.75 10150'
TFA
FazePro 21371'
Bit #
315' 40.0 5.50
Size
Hycalog SKH616M-E1D
Hours
100.70
Footage RPM
0
10440' Hydril 563
(current)
Units*
100% Gas In Air =10,000 Units
Type Comments
0
Top of Window milled @ 10102' MD
-Background Trip Connection -
(max)
-
Average 0
C-5i
0
C-1
0
0
0
0
C-3
Clyst
C-4i
Cement
Gas Summary
Cly Siltst
10906' 5
10.0
17
Chromatograph (ppm)
Sh
8.75 0.902
Coal
Weight
Sd Lst
10465' 120
Avg
14
Alkal
Mud
5.4 2.00 2.60
Flow In (spm) Gallons/stroke
Lime
Tuff Gvl
API FL
C-5n C-4n
00
0 0
C-2
0
0
0 00
Minimum 0 0
Depth
Maximum
in
Set At
Ss Cht
14-Oct-2013
24:00:00
21371'
21371'
0'
Yesterday's Depth:
Current Depth:
24 Hour Progress:
ENI Petroleum AK-AM-0900765688
to 21371' 21371'
Mill Tooth XR+
OP14-S3L1
Nikaitchuq
Oliktok Point
Depth
Grade
Nabors 245E
907-685-1490 Unit Phone:
0
E. Opitz
L-80
SPP (psi)
Report By: Logging Engineers: E. Opitz / J. Failing
(max)
RIH with Liner
Simonson / Sherman
Depth in / out
Max @ ft Avg
Casing
Summary
Size
Current
Bit Type
21371'
Flow In (gpm)
9 5/8" 47.0
Lithology (%)
0.746
(current)
0
.
*
24 hr Recap:
9 5/8" 47.0
Lithology (%)
0.746
(current)
0
Max @ ft Avg
Casing
Summary
Size
Current
Bit Type
21371'
Flow In (gpm)
Report By: Logging Engineers: E. Opitz / J. Failing
(max)
L/D 5" DP
Perry / Sherman
Depth in / out
Grade
Nabors 245E
907-685-1490 Unit Phone:
0
E. Opitz
L-80
SPP (psi)
ENI Petroleum AK-AM-0900765688
to 21371' 21371'
Mill Tooth XR+
OP14-S3L1
Nikaitchuq
Oliktok Point
Depth
15-Oct-2013
24:00:00
21371'
21371'
0'
Yesterday's Depth:
Current Depth:
24 Hour Progress:
Depth
Maximum
in
Set At
Ss Cht
0
Minimum 0 0
0 0
C-2
0
0
C-5n C-4n
00
0 0
Flow In (spm) Gallons/stroke
Lime
Tuff Gvl
API FL
Avg
Alkal
Mud
45000.00
8.75 0.902
Coal
Weight
Sd Lst
10465' 120
Siltst
10906' 5
10.0
Chromatograph (ppm)
Sh Cement
Gas Summary
Cly
C-3
Clyst
C-4i
0
C-1
0
0
0
0
C-5i
Average 0
59
(max)
--Background Trip Connection 100% Gas In Air =10,000 Units
Type Comments
0
Top of Window milled @ 10102' MD
0
10440' Hydril 563
(current)
Units*
315' 40.0 5.50
Size
Hycalog SKH616M-E1D
Hours
100.70
Footage RPM Condition
1-1-WT-A-E-I-NO-BHA 1 8.75 10150'
TFA
Brine 21371'
Bit #
1-1-BT-N-X-I-NO-TD 2
4.23
(lb/bbl) ml/30min Mud Type
10465'
WOB
Ratio
Mud Data
Depth
Tools
Oil / Water
(lb/100ft 2)
PV
Total Charges:
Rig Activity:
@
Current Pump & Flow Data:
Report For:
24 hr Max
96%
8.70
Cor Solids
%cP
Morning Report Report # 27
Customer:
Well:
Area:
Location:
Rig:
Job No.:
Daily Charges:
Time:
Date:
ROP
MWD Summary
out (sec/qt)
ROP (ft/hr)
Min
YP
Max ECD (ppg)
Density (ppg) Viscosity
Continue to RIH with 5.5" slotted liner and land shoe at 21362' MD. Displace to brine. TOOH and L/D 5" DP.
This will be the final report for this well.
WELL INFORMATION
Customer :ENI Petroleum
Well Name :OP14-S3L1
Job Number :AK-XX-0900765688
Rig Name :Nabors 245
Field Name :Nikaitchuq
Country :USA
Survey Report
DIRECTIONAL SURVEY DATA
Tie-in
0.00 0.00 0.00 0.00 0.00 N 0.00 E
(ft)
Measured Depth DoglegVertical SectionDeparture
(ft)
Latitude
(ft)
Vertical Depth
(deg)
DirectionInclination
(deg)(ft)(ft)(°/100')
0.00 0.00 0.00 0.00 0.00 N 0.00 E 0.00 0.00
167.94 0.15 292.11 167.94 0.08 N 0.20 W 0.22 0.09
258.82 0.03 11.10 258.82 0.15 N 0.31 W 0.34 0.16
361.36 0.19 237.01 361.36 0.08 N 0.45 W 0.42 0.21
452.48 0.71 286.79 452.48 0.17 N 1.11 W 1.03 0.66
543.76 2.69 304.84 543.71 1.55 N 3.41 W 3.71 2.22
635.10 6.32 309.26 634.76 5.96 N 9.07 W 10.85 3.99
729.04 9.16 310.39 727.83 14.08 N 18.77 W 23.40 3.03
826.21 10.40 311.43 823.59 24.89 N 31.24 W 39.74 1.29
922.46 12.62 308.69 917.90 37.22 N 45.96 W 58.79 2.37
983.80 12.74 306.38 977.74 45.42 N 56.63 W 72.20 0.85
1079.61 15.63 306.61 1,070.62 59.38 N 75.50 W 95.63 3.02
1175.20 21.09 307.66 1,161.31 77.59 N 99.47 W 125.64 5.72
1266.19 24.73 308.59 1,245.11 99.47 N 127.32 W 160.89 4.02
1367.29 26.62 307.76 1,336.22 126.53 N 161.76 W 204.50 1.90
1461.99 27.40 307.32 1,420.59 152.73 N 195.86 W 247.36 0.85
1558.39 26.12 306.54 1,506.67 178.82 N 230.55 W 290.65 1.38
1654.14 27.77 305.05 1,592.02 204.18 N 265.75 W 333.97 1.86
1750.08 29.18 305.95 1,676.35 230.74 N 302.98 W 379.66 1.54
1845.40 28.47 305.55 1,759.86 257.60 N 340.28 W 425.55 0.77
1939.88 29.54 309.72 1,842.50 285.58 N 376.52 W 471.17 2.42
2037.37 30.99 315.93 1,926.72 318.98 N 412.47 W 519.48 3.54
2132.25 33.45 319.01 2,006.99 356.27 N 446.62 W 568.38 3.12
2225.94 35.68 323.34 2,084.15 397.69 N 479.88 W 618.77 3.54
2259.12 36.65 324.33 2,110.93 413.50 N 491.43 W 637.04 3.41
2321.87 36.23 325.85 2,161.42 444.06 N 512.77 W 671.52 1.59
2418.55 36.99 328.20 2,239.03 492.43 N 544.13 W 724.07 1.65
2513.79 38.37 333.11 2,314.42 543.16 N 572.61 W 775.47 3.47
2609.54 39.79 337.38 2,388.76 597.96 N 597.84 W 826.35 3.18
2705.42 41.89 341.38 2,461.30 656.63 N 619.87 W 876.63 3.50
2800.24 44.91 346.09 2,530.21 719.15 N 638.03 W 925.74 4.67
2896.84 48.14 351.72 2,596.69 787.89 N 651.42 W 974.20 5.39
INSITE V7.4.20 Page 1Job No:AK-XX-0900765688 Well Name:OP14-S3L1 Survey Report
DIRECTIONAL SURVEY DATA
(ft)
Measured Depth DoglegVertical SectionDeparture
(ft)
Latitude
(ft)
Vertical Depth
(deg)
DirectionInclination
(deg)(ft)(ft)(°/100')
2992.22 51.19 354.07 2,658.42 860.03 N 660.37 W 1020.78 3.71
3087.05 53.14 355.61 2,716.59 934.61 N 667.09 W 1066.80 2.42
3184.05 56.56 357.23 2,772.43 1,013.75 N 672.02 W 1113.78 3.78
3279.53 60.00 359.32 2,822.63 1,094.92 N 674.44 W 1159.75 4.06
3375.69 63.42 0.45 2,868.19 1,179.58 N 674.60 W 1205.70 3.70
3471.51 66.70 3.34 2,908.60 1,266.39 N 671.69 W 1250.25 4.38
3567.87 69.43 3.76 2,944.59 1,355.59 N 666.16 W 1293.88 2.86
3662.83 73.33 4.52 2,974.91 1,445.33 N 659.65 W 1336.98 4.18
3757.90 76.97 4.76 2,999.27 1,536.91 N 652.22 W 1380.30 3.84
3853.72 80.42 5.07 3,018.05 1,630.51 N 644.17 W 1424.19 3.61
3948.91 81.85 4.77 3,032.72 1,724.21 N 636.10 W 1468.13 1.53
4044.36 81.90 4.21 3,046.21 1,818.41 N 628.71 W 1512.90 0.58
4140.47 81.60 4.33 3,060.00 1,913.26 N 621.63 W 1558.28 0.34
4236.26 81.48 7.00 3,074.09 2,007.54 N 612.27 W 1601.45 2.76
4331.83 81.91 9.28 3,087.90 2,101.15 N 598.88 W 1640.85 2.40
4428.19 81.60 10.10 3,101.72 2,195.15 N 582.83 W 1678.24 0.90
4523.82 81.66 10.05 3,115.64 2,288.30 N 566.28 W 1714.74 0.08
4619.51 81.88 10.18 3,129.34 2,381.54 N 549.65 W 1751.22 0.27
4715.29 81.78 10.09 3,142.95 2,474.86 N 532.97 W 1787.71 0.14
4811.27 81.72 9.68 3,156.72 2,568.44 N 516.66 W 1824.65 0.43
4905.48 82.02 8.99 3,170.04 2,660.47 N 501.53 W 1861.74 0.79
5001.03 81.89 9.23 3,183.42 2,753.88 N 486.55 W 1899.71 0.28
5097.50 81.90 8.82 3,197.02 2,848.21 N 471.57 W 1938.16 0.42
5192.60 81.84 8.29 3,210.47 2,941.30 N 457.57 W 1976.78 0.56
5287.76 81.84 8.19 3,223.97 3,034.53 N 444.07 W 2015.88 0.10
5384.33 81.87 9.11 3,237.66 3,129.04 N 429.69 W 2054.95 0.94
5479.79 81.87 9.74 3,251.16 3,222.26 N 414.21 W 2092.40 0.65
5576.01 81.70 9.39 3,264.91 3,316.17 N 398.39 W 2129.92 0.40
5671.17 81.33 10.20 3,278.95 3,408.91 N 382.38 W 2166.66 0.93
5766.99 80.57 10.11 3,294.02 3,502.06 N 365.69 W 2203.04 0.80
5862.95 79.55 10.90 3,310.58 3,594.99 N 348.46 W 2238.86 1.34
5958.14 78.35 11.73 3,328.83 3,686.60 N 330.13 W 2273.03 1.52
6055.02 78.34 11.96 3,348.40 3,779.46 N 310.66 W 2306.92 0.23
6150.52 79.42 12.43 3,366.82 3,871.05 N 290.86 W 2339.85 1.23
6245.45 82.06 13.15 3,382.09 3,962.41 N 270.12 W 2371.85 2.88
6342.03 83.32 12.27 3,394.38 4,055.86 N 249.05 W 2404.71 1.59
6438.02 83.37 10.96 3,405.51 4,149.24 N 229.85 W 2439.12 1.36
6533.75 83.46 8.22 3,416.49 4,243.00 N 214.01 W 2476.55 2.84
6629.37 83.40 6.94 3,427.43 4,337.16 N 201.48 W 2516.98 1.33
6726.08 83.70 6.88 3,438.29 4,432.56 N 189.92 W 2558.89 0.32
6822.08 83.44 6.57 3,449.04 4,527.30 N 178.75 W 2600.78 0.42
6917.00 82.80 6.50 3,460.41 4,620.93 N 168.02 W 2642.44 0.68
7011.52 82.89 8.22 3,472.19 4,713.93 N 156.01 W 2682.68 1.81
7107.89 82.76 8.85 3,484.22 4,808.49 N 141.82 W 2721.93 0.66
7203.39 82.72 9.13 3,496.29 4,902.06 N 127.01 W 2760.13 0.29
INSITE V7.4.20 Page 2Job No:AK-XX-0900765688 Well Name:OP14-S3L1 Survey Report
DIRECTIONAL SURVEY DATA
(ft)
Measured Depth DoglegVertical SectionDeparture
(ft)
Latitude
(ft)
Vertical Depth
(deg)
DirectionInclination
(deg)(ft)(ft)(°/100')
7299.39 82.25 10.10 3,508.85 4,995.90 N 111.12 W 2797.55 1.11
7394.64 81.84 10.55 3,522.03 5,088.70 N 94.21 W 2833.57 0.64
7490.39 81.66 10.93 3,535.77 5,181.80 N 76.55 W 2869.11 0.44
7586.73 81.85 12.52 3,549.59 5,275.15 N 57.18 W 2903.35 1.65
7683.24 81.69 13.16 3,563.40 5,368.28 N 35.95 W 2935.90 0.68
7778.46 81.87 13.43 3,577.01 5,460.00 N 14.28 W 2967.32 0.34
7874.49 82.24 12.23 3,590.29 5,552.73 N 6.84 E 2999.76 1.30
7970.51 81.56 11.13 3,603.82 5,645.82 N 26.09 E 3033.96 1.34
8065.87 82.09 8.38 3,617.38 5,738.84 N 42.08 E 3070.87 2.91
8162.21 82.04 5.44 3,630.68 5,833.55 N 53.55 E 3112.48 3.02
8258.14 82.46 5.58 3,643.62 5,928.17 N 62.68 E 3156.02 0.46
8353.20 82.37 3.28 3,656.17 6,022.11 N 69.96 E 3200.74 2.40
8449.06 83.65 0.26 3,667.84 6,117.19 N 72.89 E 3249.74 3.40
8496.32 83.87 0.28 3,672.97 6,164.17 N 73.12 E 3274.99 0.47
8536.55 84.20 359.39 3,677.15 6,204.19 N 73.00 E 3296.74 2.35
8632.65 85.03 357.93 3,686.17 6,299.83 N 70.76 E 3350.39 1.74
8728.70 85.81 354.31 3,693.85 6,395.34 N 64.28 E 3407.54 3.84
8824.51 86.40 349.59 3,700.36 6,489.96 N 50.90 E 3470.00 4.95
8920.26 85.90 345.07 3,706.79 6,583.14 N 29.95 E 3538.05 4.74
9015.91 84.96 341.41 3,714.41 6,674.42 N 2.46 E 3610.57 3.94
9111.72 84.54 337.22 3,723.18 6,763.66 N 31.23 W 3687.20 4.38
9207.81 85.39 332.33 3,731.62 6,850.22 N 72.01 W 3768.35 5.15
9304.11 85.42 327.70 3,739.34 6,933.34 N 119.97 W 3853.67 4.79
9400.75 84.27 323.91 3,748.03 7,012.94 N 174.05 W 3942.22 4.08
9495.01 85.00 321.32 3,756.84 7,087.50 N 231.03 W 4030.49 2.84
9591.38 85.61 318.20 3,764.73 7,160.80 N 293.07 W 4122.33 3.29
9687.21 84.40 313.19 3,773.08 7,229.10 N 359.72 W 4215.35 5.36
9781.94 84.26 308.91 3,782.45 7,290.99 N 430.79 W 4308.61 4.50
9876.89 83.74 305.67 3,792.37 7,348.20 N 505.91 W 4402.73 3.44
9973.30 83.94 305.56 3,802.72 7,404.02 N 583.83 W 4498.47 0.24
10069.20 83.97 304.57 3,812.82 7,458.80 N 661.89 W 4593.76 1.03
10102.00 83.94 304.92 3,816.27 7,477.39 N 688.69 W 4626.35 1.07
10204.82 85.50 299.50 3,825.74 7,531.94 N 775.29 W 4728.69 5.46
10300.68 86.08 294.30 3,832.78 7,575.18 N 860.51 W 4823.76 5.44
10335.76 86.23 293.32 3,835.13 7,589.31 N 892.54 W 4858.33 2.82
10436.91 87.46 292.31 3,840.70 7,628.47 N 985.63 W 4957.80 1.57
10535.40 90.22 292.58 3,842.70 7,666.06 N 1,076.63 W 5054.67 2.82
10630.57 90.56 292.21 3,842.05 7,702.32 N 1,164.62 W 5148.28 0.53
10726.38 90.09 292.06 3,841.50 7,738.41 N 1,253.37 W 5242.44 0.51
10821.92 89.77 291.66 3,841.62 7,773.99 N 1,342.04 W 5336.26 0.54
10918.38 89.08 293.53 3,842.59 7,811.05 N 1,431.08 W 5431.19 2.07
11013.72 88.92 294.22 3,844.25 7,849.63 N 1,518.25 W 5525.37 0.74
11109.00 89.06 294.14 3,845.93 7,888.65 N 1,605.16 W 5619.57 0.17
11205.29 89.63 294.85 3,847.03 7,928.57 N 1,692.78 W 5714.85 0.95
11301.42 90.38 295.62 3,847.03 7,969.55 N 1,779.73 W 5810.14 1.12
INSITE V7.4.20 Page 3Job No:AK-XX-0900765688 Well Name:OP14-S3L1 Survey Report
DIRECTIONAL SURVEY DATA
(ft)
Measured Depth DoglegVertical SectionDeparture
(ft)
Latitude
(ft)
Vertical Depth
(deg)
DirectionInclination
(deg)(ft)(ft)(°/100')
11398.97 90.66 298.41 3,846.14 8,013.85 N 1,866.62 W 5907.19 2.87
11492.17 90.63 299.94 3,845.09 8,059.28 N 1,947.99 W 6000.20 1.64
11589.38 90.66 303.28 3,844.00 8,110.22 N 2,030.76 W 6097.37 3.44
11681.59 91.01 306.63 3,842.65 8,163.04 N 2,106.32 W 6189.49 3.65
11778.58 90.86 310.65 3,841.07 8,223.58 N 2,182.05 W 6285.94 4.15
11874.32 90.54 308.01 3,839.90 8,284.25 N 2,256.09 W 6381.03 2.78
11969.20 90.05 305.95 3,839.41 8,341.32 N 2,331.88 W 6475.65 2.23
12066.38 90.31 304.91 3,839.10 8,397.66 N 2,411.07 W 6572.72 1.10
12162.72 89.69 304.12 3,839.10 8,452.24 N 2,490.45 W 6669.02 1.04
12258.64 91.96 303.94 3,837.72 8,505.91 N 2,569.93 W 6764.90 2.37
12354.79 92.56 304.11 3,833.93 8,559.67 N 2,649.55 W 6860.95 0.65
12450.62 92.79 307.78 3,829.46 8,615.85 N 2,727.04 W 6956.51 3.83
12546.09 92.35 309.99 3,825.18 8,675.72 N 2,801.27 W 7051.34 2.36
12641.81 91.44 309.49 3,822.01 8,736.88 N 2,874.84 W 7146.30 1.08
12737.20 91.70 307.17 3,819.40 8,796.02 N 2,949.63 W 7241.20 2.45
12833.04 89.49 306.02 3,818.40 8,853.14 N 3,026.57 W 7336.81 2.60
12929.18 89.59 305.46 3,819.17 8,909.30 N 3,104.60 W 7432.82 0.59
13020.91 90.26 304.80 3,819.29 8,962.08 N 3,179.62 W 7524.47 1.03
13051.81 90.56 305.24 3,819.07 8,979.81 N 3,204.93 W 7555.34 1.72
13147.70 89.48 304.50 3,819.04 9,034.63 N 3,283.60 W 7651.17 1.37
13216.21 89.03 304.86 3,819.93 9,073.61 N 3,339.93 W 7719.63 0.84
13280.03 88.63 304.64 3,821.23 9,109.98 N 3,392.36 W 7783.40 0.72
13338.77 89.26 306.02 3,822.32 9,143.94 N 3,440.27 W 7842.07 2.58
13434.63 90.55 306.42 3,822.47 9,200.58 N 3,517.60 W 7937.75 1.41
13530.64 90.76 307.67 3,821.38 9,258.42 N 3,594.23 W 8033.49 1.32
13626.50 89.95 308.04 3,820.78 9,317.24 N 3,669.91 W 8128.97 0.93
13722.25 89.82 309.59 3,820.98 9,377.26 N 3,744.52 W 8224.18 1.62
13817.94 90.44 311.26 3,820.76 9,439.31 N 3,817.36 W 8319.02 1.86
13913.67 90.68 311.43 3,819.82 9,502.54 N 3,889.23 W 8413.67 0.31
14009.47 89.94 311.45 3,819.30 9,565.94 N 3,961.04 W 8508.38 0.77
14105.30 89.38 312.90 3,819.87 9,630.28 N 4,032.06 W 8602.91 1.62
14201.01 87.96 312.37 3,822.09 9,695.09 N 4,102.45 W 8697.18 1.58
14238.37 87.43 312.79 3,823.60 9,720.35 N 4,129.93 W 8733.96 1.81
14296.80 88.05 313.00 3,825.90 9,760.09 N 4,172.71 W 8791.44 1.12
14354.74 89.34 313.00 3,827.22 9,799.59 N 4,215.07 W 8848.44 2.23
14459.10 89.24 314.81 3,828.51 9,871.95 N 4,290.25 W 8950.82 1.74
14583.39 90.54 311.40 3,828.75 9,956.87 N 4,380.98 W 9073.08 2.94
14680.22 90.12 303.67 3,828.19 10,015.82 N 4,457.70 W 9169.50 7.99
14776.05 89.70 302.76 3,828.34 10,068.31 N 4,537.88 W 9265.32 1.05
14871.81 90.12 303.49 3,828.50 10,120.64 N 4,618.07 W 9361.08 0.88
14967.03 90.74 305.73 3,827.78 10,174.72 N 4,696.44 W 9456.24 2.44
15063.18 91.36 307.60 3,826.02 10,232.12 N 4,773.54 W 9552.15 2.05
15159.18 90.83 308.93 3,824.18 10,291.56 N 4,848.90 W 9647.69 1.49
15254.58 90.43 310.14 3,823.13 10,352.28 N 4,922.47 W 9742.42 1.34
15349.58 89.78 308.67 3,822.96 10,412.58 N 4,995.88 W 9836.78 1.69
INSITE V7.4.20 Page 4Job No:AK-XX-0900765688 Well Name:OP14-S3L1 Survey Report
DIRECTIONAL SURVEY DATA
(ft)
Measured Depth DoglegVertical SectionDeparture
(ft)
Latitude
(ft)
Vertical Depth
(deg)
DirectionInclination
(deg)(ft)(ft)(°/100')
15445.66 90.26 307.68 3,822.93 10,471.97 N 5,071.41 W 9932.43 1.15
15540.87 90.60 306.25 3,822.21 10,529.22 N 5,147.47 W 10027.38 1.54
15636.50 91.29 306.18 3,820.64 10,585.71 N 5,224.62 W 10122.82 0.73
15732.27 92.37 307.93 3,817.58 10,643.38 N 5,301.01 W 10218.27 2.15
15828.66 93.90 309.30 3,812.31 10,703.45 N 5,376.20 W 10314.01 2.13
15924.86 93.76 309.50 3,805.88 10,764.37 N 5,450.38 W 10409.35 0.25
16020.06 91.25 309.53 3,801.72 10,824.88 N 5,523.74 W 10503.80 2.64
16116.58 93.10 310.00 3,798.06 10,886.57 N 5,597.88 W 10599.52 1.98
16211.37 93.01 310.07 3,793.00 10,947.46 N 5,670.35 W 10693.42 0.12
16307.07 90.46 309.72 3,790.11 11,008.81 N 5,743.73 W 10788.33 2.69
16402.49 91.94 308.47 3,788.11 11,068.96 N 5,817.77 W 10883.14 2.03
16498.20 92.48 307.31 3,784.42 11,127.70 N 5,893.25 W 10978.40 1.34
16594.70 92.24 304.95 3,780.44 11,184.54 N 5,971.12 W 11074.64 2.46
16689.34 91.38 302.59 3,777.45 11,237.12 N 6,049.74 W 11169.21 2.65
16784.07 89.47 301.52 3,776.75 11,287.39 N 6,130.02 W 11263.93 2.31
16881.45 89.77 301.75 3,777.40 11,338.47 N 6,212.93 W 11361.29 0.39
16975.39 89.71 300.81 3,777.82 11,387.24 N 6,293.21 W 11455.19 1.00
17072.58 91.32 299.13 3,776.95 11,435.79 N 6,377.40 W 11552.26 2.39
17168.03 93.01 299.57 3,773.34 11,482.54 N 6,460.53 W 11647.46 1.83
17263.95 90.04 303.29 3,770.79 11,532.52 N 6,542.33 W 11743.30 4.96
17359.71 88.73 297.58 3,771.82 11,581.01 N 6,624.85 W 11838.93 6.12
17455.82 89.31 292.50 3,773.46 11,621.67 N 6,711.89 W 11934.12 5.32
17551.56 91.69 287.90 3,772.63 11,654.71 N 6,801.70 W 12027.53 5.41
17647.55 91.63 289.00 3,769.85 11,685.08 N 6,892.72 W 12120.50 1.15
17743.33 91.20 288.60 3,767.48 11,715.94 N 6,983.36 W 12213.42 0.61
17789.21 90.82 286.27 3,766.67 11,729.68 N 7,027.12 W 12257.65 5.14
17886.32 90.51 285.14 3,765.55 11,755.96 N 7,120.60 W 12350.48 1.21
17934.80 90.37 286.72 3,765.17 11,769.27 N 7,167.22 W 12396.88 3.27
18030.34 92.11 282.88 3,763.11 11,793.66 N 7,259.54 W 12487.72 4.41
18127.22 92.90 284.47 3,758.87 11,816.54 N 7,353.58 W 12579.17 1.83
18222.87 95.25 289.23 3,752.07 11,844.18 N 7,444.87 W 12670.89 5.54
18317.48 94.34 290.29 3,744.16 11,876.06 N 7,533.59 W 12762.75 1.47
18413.39 94.09 292.79 3,737.11 11,911.17 N 7,622.55 W 12856.56 2.61
18509.49 93.92 294.78 3,730.40 11,949.83 N 7,710.27 W 12951.24 2.07
18604.84 93.79 296.74 3,723.99 11,991.18 N 7,795.95 W 13045.66 2.06
18700.33 92.58 299.33 3,718.68 12,035.99 N 7,880.09 W 13140.67 2.99
18796.83 92.19 303.19 3,714.67 12,086.01 N 7,962.50 W 13237.03 4.02
18892.95 92.32 306.00 3,710.88 12,140.54 N 8,041.55 W 13333.02 2.92
18989.49 92.62 308.05 3,706.72 12,198.61 N 8,118.55 W 13429.20 2.14
19085.75 91.77 308.55 3,703.03 12,258.23 N 8,194.04 W 13524.94 1.02
19181.13 90.54 309.02 3,701.11 12,317.96 N 8,268.37 W 13619.77 1.38
19275.44 89.42 307.10 3,701.15 12,376.10 N 8,342.62 W 13713.67 2.36
19371.06 88.59 305.75 3,702.81 12,432.86 N 8,419.55 W 13809.08 1.66
19467.35 91.64 307.78 3,702.61 12,490.49 N 8,496.67 W 13905.12 3.80
19563.29 88.55 305.67 3,702.45 12,547.84 N 8,573.55 W 14000.82 3.90
INSITE V7.4.20 Page 5Job No:AK-XX-0900765688 Well Name:OP14-S3L1 Survey Report
DIRECTIONAL SURVEY DATA
(ft)
Measured Depth DoglegVertical SectionDeparture
(ft)
Latitude
(ft)
Vertical Depth
(deg)
DirectionInclination
(deg)(ft)(ft)(°/100')
19658.62 89.46 305.50 3,704.11 12,603.31 N 8,651.07 W 14096.02 0.97
19755.95 90.86 304.80 3,703.84 12,659.34 N 8,730.65 W 14193.26 1.61
19850.68 91.13 302.20 3,702.19 12,711.61 N 8,809.62 W 14287.96 2.76
19944.89 90.83 303.26 3,700.58 12,762.54 N 8,888.86 W 14382.15 1.17
20041.35 91.01 303.36 3,699.03 12,815.51 N 8,969.47 W 14478.60 0.21
20137.76 92.32 304.85 3,696.23 12,869.54 N 9,049.26 W 14574.93 2.06
20231.02 90.69 301.86 3,693.78 12,920.79 N 9,127.12 W 14668.14 3.65
20327.74 87.95 301.25 3,694.93 12,971.40 N 9,209.52 W 14764.83 2.90
20422.50 90.56 299.20 3,696.16 13,019.09 N 9,291.38 W 14859.47 3.50
20517.92 91.53 298.85 3,694.42 13,065.38 N 9,374.80 W 14954.67 1.08
20614.49 90.37 297.33 3,692.82 13,110.84 N 9,459.98 W 15050.90 1.98
20709.84 92.51 295.44 3,690.42 13,153.20 N 9,545.36 W 15145.62 2.99
20805.47 92.42 295.67 3,686.31 13,194.41 N 9,631.56 W 15240.40 0.26
20901.15 93.02 296.58 3,681.77 13,236.49 N 9,717.36 W 15335.33 1.14
20997.25 92.89 298.35 3,676.81 13,280.76 N 9,802.52 W 15430.89 1.84
21094.25 92.21 300.07 3,672.50 13,328.04 N 9,887.09 W 15527.60 1.91
21190.03 90.56 297.48 3,670.18 13,374.13 N 9,971.01 W 15623.11 3.21
21286.18 88.94 294.73 3,670.60 13,416.43 N 10,057.34 W 15718.60 3.32
21304.74 89.50 295.01 3,670.86 13,424.24 N 10,074.18 W 15736.98 3.37
21371.00 89.50 295.01 3,671.43 13,452.25 N 10,134.22 W 15802.63 0.00
DIRECTIONAL SURVEY DATA NOTES
- Calculation based on minimum curvature method.
- Survey coordinates relative to well system reference point.
- TVD values given relative to drilling measurement point.
- Vertical section relative to well head.
- Vertical section is computed along a direction of 302.77 degrees (True)
- A total correction of 19.69 deg from Magnetic north to True north has been applied
- Horizontal displacement is relative to the well head.
- Horizontal displacement (closure) at 21,371.00 feet is 16,842.37 feet along 323.01 degrees (True)
INSITE V7.4.20 Page 6Job No:AK-XX-0900765688 Well Name:OP14-S3L1 Survey Report