Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAbout196-022Suspended Well Inspection Review Report Reviewed By:
P.I. Suprv
Comm ________
JBR 07/25/2025
InspectNo:susKPS250608121731
Well Pressures (psi):
Date Inspected:6/8/2025
Inspector:Kam StJohn
If Verified, How?Other (specify in comments)
Suspension Date:2/21/1996
Tubing:0
IA:0
OA:0
Operator:Hilcorp Alaska, LLC
Operator Rep:Steve Soroka
Date AOGCC Notified:5/27/2025
Type of Inspection:Subsequent
Well Name:DUCK IS UNIT MPI 1-59
Permit Number:1960220
Wellhead Condition
No wellhouse, area around well was clean and free of debris. No leaks or drips seen. New gauges on valves.
Surrounding Surface Condition
Good clean area
Condition of Cellar
Clean no water or sheen
Comments
Location verified on pad map
Supervisor Comments
Photos (1)
Suspension Approval:Completion Report
Location Verified?
Offshore?
Fluid in Cellar?
Wellbore Diagram Avail?
Photos Taken?
VR Plug(s) Installed?
BPV Installed?
Friday, July 25, 2025
2028-0608_Suspend_DIU_MPI_1-59_photo_ksj
Page 1 of 1
Suspended Well Inspection – Duck Island Unnit (Endicott) MPI 1-59
PTD 1960220
AOGCC Inspection Rpt # susKPS250608121731
Photos by AOGCC Inspector K. StJohn
6/8/2025
1. Operations Susp Well Insp Plug Perforations Fracture Stimulate Pull Tubing Operations shutdown
Performed: Install Whipstock Perforate Other Stimulate Alter Casing Change Approved Program
Mod Artificial Lift Perforate New Pool Repair Well Coiled Tubing Ops Other:
Development Exploratory
Stratigraphic Service 6. API Number:
7. Property Designation (Lease Number): 8. Well Name and Number:
9. Logs (List logs and submit electronic data per 20AAC25.071): 10. Field/Pool(s):
11. Present Well Condition Summary:
Total Depth measured 12,090 feet 4,424 feet
true vertical 10,216 feet N/A feet
Effective Depth measured 4,424 feet NA feet
true vertical 4,148 feet NA feet
Perforation depth Measured depth See Schematic feet
True Vertical depth See Schematic feet
Tubing (size, grade, measured and true vertical depth) 4-1/2"80'
Packers and SSSV (type, measured and true vertical depth)NA NA
12. Stimulation or cement squeeze summary: N/A
Intervals treated (measured):
Treatment descriptions including volumes used and final pressure: N/A
13a.
Prior to well operation:
Subsequent to operation:
13b. Pools active after work: Same
15. Well Class after work:
Daily Report of Well Operations Exploratory Development Service Stratigraphic
Copies of Logs and Surveys Run 16. Well Status after work: Oil Gas WDSPL
Electronic Fracture Stimulation Data GSTOR GINJ SUSP SPLUG
Sundry Number or N/A if C.O. Exempt:
Authorized Name and
Digital Signature with Date: Contact Name:
Contact Email:
Authorized Title:Operations Manager Contact Phone:
Water-BblOil-Bbl
17. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Ryan Thompson
ryan.thompson@hilcorp.com
907-564-5005
NA
Sr Pet Eng: Sr Pet Geo: Sr Res Eng:
WINJ WAG
N/A
measured
true vertical
Packer
MD
110'
Size
110'
4,423'
Length
Representative Daily Average Production or Injection Data
Casing Pressure Tubing Pressure
14. Attachments (required per 20 AAC 25.070, 25.071, & 25.283)
0
Gas-Mcf
0
000
0 00
0
0
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
REPORT OF SUNDRY WELL OPERATIONS
196-022
50-029-22644-00-00
3800 Centerpoint Dr, Suite 1400
Anchorage, AK 99503
3. Address:
Hilcorp Alaska LLC
NA
5. Permit to Drill Number:2. Operator Name 4. Well Class Before Work:
ADL0034633, ADL0312828 DUCK IS UNIT MPI 1-59
Casing
10-3/4"
ENDICOTT / ENDICOTT OIL
Conductor
4,737'Surface
Burst
NA
Collapse
Intermediate
Plugs
Junk measured
measured
Slotted Liner
30"110'
4,737'
TVD
NA
2,090psi3,580psi
PL
G
Form 10-404 Revised 10/2022 Due Within 30 days of Operations Submit in PDF format to aogcc.permitting@alaska.gov
By Grace Christianson at 2:33 pm, Jul 08, 2025
Digitally signed by Justus Hinks
(3691)
DN: cn=Justus Hinks (3691)
Reason: I attest to the accuracy
and integrity of this document
Date: 2025.07.08 13:09:36 -08'00'
Justus Hinks
(3691)
DSR-7/21/25JJL 7/21/25
RBDMS JSB 071025
Date Inspected:
Inspector: Operator:
Well Name: Oper. Rep:
PTD No.: Oper. Phone:
Location Verified? Oper. Email:steve.soroka@hilcorp.com
If Verified, How?
Onshore / Offshore:
Date AOGCC Notified:
Suspension Date: Type of Inspection:
Sundry No.: Wellbore Diagram Avail.?
Photos Taken?
Well Pressures (psi): Tubing 0
IA 0
OA 0
Condition of
Wellhead:
Comments:
Attachments:
Insp. Suprv
Comm
Follow Up Actions
Needed:
Hilcorp Alaska, LLC
196-022
Condition of
Surrounding Surface
Location:
02/18/21
321-005
REVIEWED BY:
Other (specify in comments)
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
Suspended Well Inspection Report
Kam St. John
06/08/25
Yes
Steve SorokaDUCK IS UNIT MPI 1-59
907-830-8976
Yes
Onshore
05/27/25
Subsequent
No Well House. Tree is weathered, all valves function smoothly. No leaks. Casing valves open to gauges.
The gravel and grating are clean. The cellar has clean gravel. The front of the well head has dunage and delineators.
None
Location verified by Pad map and sign.
WBS
Pictures
Area map
Yes
PLB 12/2014 END MPI 1-59 Suspended Well Inspection Form 2025
Hilcorp Alaska, LLC
END 1-59 Tubing gauge 7-7-2025
END 1-59 IA gauge 7-7-2025
END 1-59 OA gauge 7-7-2025
7\SHRI5HTXHVW $EDQGRQ 3OXJ3HUIRUDWLRQV )UDFWXUH6WLPXODWH 5HSDLU:HOO 2SHUDWLRQVVKXWGRZQ
6XVSHQG 3HUIRUDWH 2WKHU6WLPXODWH 3XOO7XELQJ &KDQJH$SSURYHG3URJUDP
3OXJIRU5HGULOO 3HUIRUDWH1HZ3RRO 5HHQWHU6XVS:HOO $OWHU&DVLQJ 2WKHU5HQHZ6XVSHQVLRQ
2SHUDWRU1DPH&XUUHQW:HOO&ODVV3HUPLWWR'ULOO1XPEHU
([SORUDWRU\'HYHORSPHQW
$GGUHVV6WUDWLJUDSKLF 6HUYLFH $3,1XPEHU
&HQWHUSRLQW'U6XLWH$QFKRUDJH$.
,ISHUIRUDWLQJ:HOO1DPHDQG1XPEHU
:KDW5HJXODWLRQRU&RQVHUYDWLRQ2UGHUJRYHUQVZHOOVSDFLQJLQWKLVSRRO"
:LOOSODQQHGSHUIRUDWLRQVUHTXLUHDVSDFLQJH[FHSWLRQ"<HV 1R
3URSHUW\'HVLJQDWLRQ/HDVH1XPEHU)LHOG3RROV
7RWDO'HSWK0'IW 7RWDO'HSWK79'IW (IIHFWLYH'HSWK0' (IIHFWLYH'HSWK79' 0363SVL3OXJV0'-XQN0'
1$
&DVLQJ &ROODSVH
6WUXFWXUDO
&RQGXFWRU 1$
6XUIDFH SVL
,QWHUPHGLDWH
3URGXFWLRQ
/LQHU
3DFNHUVDQG66697\SH3DFNHUVDQG66690'IWDQG79'IW
$WWDFKPHQWV 3URSRVDO6XPPDU\ :HOOERUHVFKHPDWLF :HOO&ODVVDIWHUSURSRVHGZRUN
'HWDLOHG2SHUDWLRQV3URJUDP %236NHWFK ([SORUDWRU\6WUDWLJUDSKLF 'HYHORSPHQW 6HUYLFH
(VWLPDWHG'DWHIRU :HOO6WDWXVDIWHUSURSRVHGZRUN
&RPPHQFLQJ2SHUDWLRQV2,/:,1-:'63/6XVSHQGHG
9HUEDO$SSURYDO'DWH*$6 :$**6725 63/8*
&RPPLVVLRQ5HSUHVHQWDWLYH*,1-2S6KXWGRZQ $EDQGRQHG
&KDG+HOJHVRQ &RQWDFW1DPH 'DYLG*RUP
2SHUDWLRQV0DQDJHU &RQWDFW(PDLO
&RQWDFW3KRQH
'DWH
&RQGLWLRQVRIDSSURYDO1RWLI\&RPPLVVLRQVRWKDWDUHSUHVHQWDWLYHPD\ZLWQHVV 6XQGU\1XPEHU
3OXJ,QWHJULW\%237HVW 0HFKDQLFDO,QWHJULW\7HVW /RFDWLRQ&OHDUDQFH
2WKHU
3RVW,QLWLDO,QMHFWLRQ0,75HT
G"<HV 1R
6SDFLQJ([FHSWLRQ5HTXLUHG"<HV 1R 6XEVHTXHQW)RUP5HTXLUHG
$33529('%<
$SSURYHGE\&200,66,21(5 7+(&200,66,21 'DWH
&RPP&RPP6U3HW(QJ 6U3HW*HR 6U5HV(QJ
7XELQJ0'IW
&2
GJRUP#KLOFRUSFRP
&200,66,2186(21/<
$XWKRUL]HG1DPH
7XELQJ*UDGH
35(6(17:(//&21',7,216800$5<
67$7(2)$/$6.$
$/$6.$2,/$1'*$6&216(59$7,21&200,66,21
$33/,&$7,21)25681'5<$33529$/6
$$&
$'/
+LOFRUS$ODVND//&
'8&.,681,703,
(1',&277(1',&2772,/
/HQJWK 6L]H
1$
79' %XUVW
0'
1$
SVL
1$
3HUIRUDWLRQ'HSWK79'IW 7XELQJ6L]H
1$
$XWKRUL]HG6LJQDWXUH
1$
3HUIRUDWLRQ'HSWK0'IW
1$
LQFK
$XWKRUL]HG7LWOH
,KHUHE\FHUWLI\WKDWWKHIRUHJRLQJLVWUXHDQGWKHSURFHGXUHDSSURYHGKHUHLQZLOOQRW
EHGHYLDWHGIURPZLWKRXWSULRUZULWWHQDSSURYDO
)RUP5HYLVHG$SSURYHGDSSOLFDWLRQLVYDOLGIRUPRQWKVIURPWKHGDWHRIDSSURYDO
&KDG$+HOJHVRQ
By Jody Colombie at 3:30 pm, Jan 08, 2021
SFD 1/12/2021
DSR-1/21/21MGR16FEB21SFD 1/12/2021
ADL0034633,
&RPP
ST <HV
2/18/21
dts 2/17/2021 JLC 2/17/2021
RBDMS HEW 2/25/2021
ƵĐŬ/ƐůĂŶĚhŶŝƚDW/ϭͲϱϵ
dĞĐŚŶŝĐĂů:ƵƐƚŝĨŝĐĂƚŝŽŶĨŽƌƉƉůŝĐĂƚŝŽŶŽĨZĞŶĞǁĂůŽĨ^ƵƐƉĞŶƐŝŽŶ^ƚĂƚƵƐ
:ƵůLJϭƐƚ͕ϮϬϮϬ
:HOO6WDWXV
'XFN,VODQG8QLW03,ZDVGULOOHGWR7'DQGVXVSHQGHGRQDIWHUWKH]RQHVRI
LQWHUHVWZHUHIRXQGWREHZDWHUVZHSW6XUIDFHFDVLQJZDVUXQWR¶DQGWKHRSHQKROH
H[WHQGVWR7'DW¶$SOXJZDVOHIWIURP¶WR¶$VHFRQGFHPHQWSOXJH[WHQGV
IURP¶WR¶
7KHZHOOLVPHFKDQLFDOO\VRXQGDVLQGLFDWHGE\DSDVVLQJ0,7,$WRSVLDQGDSDVVLQJ0,7
2$RQ7KHZHOOZLOOQRWDOORZWKHPLJUDWLRQRIIOXLGVZLOOQRWGDPDJHIUHVKZDWHU
SURGXFLQJRUSRWHQWLDOO\SURGXFLQJIRUPDWLRQVZLOOQRWLPSDLUWKHUHFRYHU\RIRLORUJDVDQGLV
VHFXUHVDIHDQGQRWDWKUHDWWRSXEOLFKHDOWK7KHVWUDWDWKURXJKZKLFKWKHZHOOZDVGULOOHGLV
QHLWKHUDEQRUPDOO\JHRSUHVVXUHGQRUGHSOHWHG
+LOFRUS$ODVND//&KDVLQFUHDVHGXQLWSURGXFWLRQWKURXJKVLGHWUDFNLQJH[LVWLQJORQJWHUPVKXWLQ
ZHOOVZHOOLQWHUYHQWLRQSURMHFWVDQGRWKHURSWLPL]DWLRQRSSRUWXQLWLHVLQUHFHQW\HDUV7KHILHOG
VWXG\RIWKH'XFN,VODQG8QLWLVSURJUHVVLQJZLWKDGGLWLRQDOZHOOLQWHUYHQWLRQUHVXOWVLQFOXGLQJQHZ
/:'GDWDIURPUHFHQWGULOOZHOOV7KHPDSSLQJRIDOOSURGXFWLYHKRUL]RQVDQDO\]LQJSURGXFWLRQ
DQGLQMHFWLRQGDWDDQGJHRSK\VLFDOZRUNLVRQJRLQJ6XVSHQGHGZHOOVDUHQHHGHGIRUXWLOL]DWLRQ
DVDVLGHWUDFNFDQGLGDWHVIRUWKHUHGHYHORSPHQWRIWKHILHOG
&RQGLWLRQRIWKH:HOOKHDGDQG6XUIDFH/RFDWLRQ
'XFN,VODQG8QLW03,LVORFDWHGRQDQDFWLYHZHOOPDLQWDLQHGSDGZLWKFOHDQJUDYHO7KH
SLWDQGVXUURXQGLQJDUHDDUHLQJRRGFRQGLWLRQ7KHUHLVQRGLVFRORUDWLRQDQGQRVKHHQVRQWKH
SDGSLWVRUQHDUE\ZDWHU
7KHZHOOSUHVVXUHUHDGLQJVDUH7,2
5HTXHVW
+LOFRUS$ODVND//&UHTXHVWVDSSURYDOIRUUHQHZDORIWKHH[LVWLQJVXVSHQVLRQVWDWXVIRU03,
'DWH,QVSHFWHG
,QVSHFWRU 2SHUDWRU
:HOO1DPH 2SHU5HS
37'1R 2SHU3KRQH
/RFDWLRQ9HULILHG" 2SHU(PDLO
,I9HULILHG+RZ"
2QVKRUH2IIVKRUH
6XVSHQVLRQ'DWH
6XQGU\1R
:HOO3UHVVXUHVSVL 7XELQJ
,$
2$
&RQGLWLRQRI
:HOOKHDG
&RPPHQWV
$WWDFKPHQWV
,QVS6XSUY
&RPP
)ROORZ8S$FWLRQV
1HHGHG
+LOFRUS$ODVND//&
3KRWRV7DNHQ"
&RQGLWLRQRI
6XUURXQGLQJ6XUIDFH
/RFDWLRQ
5(9,(:('%<
67$7(2)$/$6.$
$/$6.$2,/$1'*$6&216(59$7,21&200,66,21
6XVSHQGHG:HOO,QVSHFWLRQ5HSRUW
'DWH$2*&&1RWLILHG
%RE1REOH
<HV
2WKHUVSHFLI\LQFRPPHQWV
:LOI+\ODQG03,
:HOOERUH6FKHPDWLF
:HOOERUH'LDJUDP$YDLO"
3KRWRRIZHOOKHDG
3DG0DS
<HV
:HDWKHUHGYDOYHVRSHUDWHJRRG1RVLJQVRIDQ\OHDNVDOOOLQHVEOLQGHGRSHQWRJDJH
<HV
*RRGFOHDQVQRZPHOWLQVHDOHGFHOODU*RRGFOHDQJUDYHODURXQGFHOODUJUDWLQJ:HOOSURWHFWHGZLWKGXQDJHLQIURQWDQGZHOO KRXVHRQHLWKHU
VLGH
2IIVKRUH
1RQH
0DSRQORFDWLRQ
ZK\ODQG#KLOFRUSFRP
6XEVHTXHQW7\SHRI,QVSHFWLRQ
3/%6XVSHQGHG:HOO,QVSHFWLRQ
1. Operations Abandon Plug Perforations Fracture Stimulate Pull Tubing Operations shutdown
Performed: Suspend Perforate Other Stimulate Alter Casing Change Approved Program
Plug for Redrill Perforate New Pool Repair Well Re-enter Susp Well Other: Inspect well
Hilcorp Alaska Development Exploratory
Stratigraphic Service 6. API Number:
7. Property Designation (Lease Number): 8. Well Name and Number:
9. Logs (List logs and submit electronic data per 20AAC25.071): 10. Field/Pool(s):
11. Present Well Condition Summary:
Total Depth measured 12,090 feet 4,424 feet
true vertical 10,216 feet N/A feet
Effective Depth measured 4,424 feet N/A feet
true vertical 4,148 feet N/A feet
Perforation depth Measured depth N/A feet
True Vertical depth N/A feet
Tubing (size, grade, measured and true vertical depth)4-1/2" N/A 80' 80'
Packers and SSSV (type, measured and true vertical depth)N/A N/A N/A
12. Stimulation or cement squeeze summary: N/A
Intervals treated (measured):
Treatment descriptions including volumes used and final pressure: N/A
13.
Prior to well operation:
Subsequent to operation:
15. Well Class after work:
Daily Report of Well Operations Exploratory Development Service Stratigraphic
Copies of Logs and Surveys Run 16. Well Status after work: Oil Gas WDSPL
Electronic Fracture Stimulation Data GSTOR GINJ SUSP SPLUG
Sundry Number or N/A if C.O. Exempt:
Chad Helgeson
Contact Name:
Authorized Title:Operations Manager
Contact Email:
Contact Phone:
WDSP2 WAG
Water-Bbl
MD
110'
4,737'
TVD
110'
Oil-Bbl
measured
true vertical
Packer
Junk measured
3800 Centerpoint Dr, Suite 1400
Anchorage, AK 99503
3. Address:
4. Well Class Before Work:
SUSPENDED
Representative Daily Average Production or Injection Data
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
REPORT OF SUNDRY WELL OPERATIONS
196-022
50-029-22644-00-00
Plugs
ADL0312828
5. Permit to Drill Number:
ENDICOTT / ENDICOTT OIL
17. I hereby certify that the foregoing is true and correct to the best of my knowledge.
N/A
Authorized Signature with date:
Authorized Name:
David Gorm
dgorm@hilcorp.com
Size
DUCK IS UNIT MPI 1-59
14. Attachments (required per 20 AAC 25.070, 25.071, & 25.283)
Gas-Mcf Casing Pressure Tubing Pressure
N/A
measured
N/A
Production
Production
Casing
Conductor
Liner
Length
110'
4,737'Surface
Intermediate
30"
10-3/4" 4,423'
Burst
N/A
3,580psi
777-8333
2. Operator Name
Senior Engineer: Senior Res. Engineer:
Collapse
N/A
2,090psi
N/A
L
G
Form 10-404 Revised 3/2020 Submit Within 30 days of Operations
By Samantha Carlisle at 3:44 pm, Jul 17, 2020
Chad A Helgeson
2020.07.17
15:17:53 -08'00'
, ADL 034633
DSR-7/20/2020
SFD 7/20/2020
MGR21JUL2020 RBDMS HEW 7/20/2020 SFD 7/20/2020
Date Inspected:
Inspector: Operator:
Well Name: Oper. Rep:
PTD No.: Oper. Phone:
Location Verified? Oper. Email:
If Verified, How?
Onshore / Offshore:
Suspension Date:
Sundry No.:
Well Pressures (psi): Tubing 0
IA 0
OA 0
Condition of
Wellhead:
Comments:
Attachments:
Insp. Suprv
Comm
Follow Up Actions
Needed:
Hilcorp Alaska, LLC
Photos Taken?
196-022
Condition of
Surrounding Surface
Location:
02/21/96
96-035
REVIEWED BY:
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
Suspended Well Inspection Report
Date AOGCC Notified:
Bob Noble
06/14/20
Yes
Other (specify in comments)
Wilf HylandMPI 1-59
1- Wellbore Schematic
Wellbore Diagram Avail.?
1 - Photo of wellhead
1 - Pad Map
Yes
Weathered, valves operate good.No signs of any leaks all lines blinded open to gage .
Yes
Good clean snow melt in sealed cellar . Good clean gravel around cellar grating . Well protected with dunage in front and well house on either
side ..
Offshore
None
Map on location
659-6530
whyland@hilcorp.com
06/13/20
SubsequentType of Inspection:
PLB 12/2014 Suspended Well Inspection 1-59 06-14-2020
ENDEAVOR
ISLAND
ENDICOTT MAIN
PRODUCTION ISLAND
(MPI)
MPI 1-53
MPI 1-59
U012N016E
Sec. 36
DUCK
ISLAND
UNIT
147°57'0"W147°57'30"W147°58'0"W
70°21'15"N70°21'15"N70°21'0"N70°21'0"NMap Date: 9/8/2015
Duck Island Unit
Endicott MPI
Well Rows
Facility Map - Figure 1 0 500 1,000
Feet
0 100 200
Meters
Alaska StatePlane Zone 3 NAD 1983 (Feet)
Legend
Well Rows
Existing Pipeline (Above Ground)
Oil and Gas Unit Boundary
Suspended Well Inspection Review Report
InspectNo: susRCN200614155145
Date Inspected: 6/14/2020 -
Inspector: Bob Noble Type of Inspection
Well Name:
DUCK IS UNIT MPI 1-59
Permit Number:
1960220
Suspension Approval:
Completion Report -
Suspension Date:
2/21/1996
Location Verified?
F/1
If Verified, How?
Other (specify in comments)
Offshore?
❑�
Subsequent _
Date AOGCC Notified: 6/13/2020
Operator: Hilcorp Alaska, LLC
Operator Rep: Wilf Hyland
Wellbore Diagram Avail? 0
Photos Taken? 0
Well Pressures (psi): Tubing:
0' -
Fluid in Cellar?
IA:
0 -
BPV Installed?
❑
OA:
0 -
VR Plug(s) Installed?
❑
Wellhead Condition
No wellhouse. Wellhead looked weathered but operated fine. No signs of leaks or drips. Wellhead protected on sides by
other wellhouses and in front with dunnage. All lines were capped with good gauges.
Condition of Cellar
Lined cellar had small amount of melt water with no sheen.
Surrounding Surface Condition
Good clean gravel
Comments
Location verified with a pad map.
Supervisor Comments
Photos(1)
Friday, June 19, 2020
Suspended — DIU 1-59 (PTD 1960220)
AOGCC Inspection #susRCN200614155145
Photos by AOGCC Inspector B. Noble
6/14/2020
2020-0614_Suspend_DIU_1-59_photos_bn.docx
Page 1 of 1
RECEIVED
STATE OF ALASKA
ALANA OIL AND GAS CONSERVATION COMIVOION SEP 0 8 2015
• REPORT OF SUNDRY WELL OPERATIONS
AOGCC
1.Operations Abandon U Plug Perforations Li Fracture Stimulate Li Pull Tubing El Operations shutdown ❑
Performed: Suspend ❑ Perforate ❑ Other Stimulate El Alter Casing❑ Change Approved Program El
Plug for Redrill ❑ 8rforate New Pool ❑ Repair Well ❑ Re-enter Susp Well❑ Other: Inspect Well ❑l
2.Operator Name: 4.Well Class Before Work: 5.Permit to Drill Number:
Hilcorp Alaska,LLC Development El Exploratory ❑ 196--022 t
3.Address: Stratigraphic❑ Service ❑ 6.API Number:
3800 Centerpoint Drive,Suite 1400,Anchorage AK,99503 50-029-22644-00-00 • •
7.Property Designation(Lease Number): 8.Well Name and Number:
ADL0312828 • DUCK IS UNIT MPI 1-59/024
9.Logs(List logs and submit electronic and printed data per 20AAC25.071): 10.Field/Pool(s): .
N/A ENDICOTT/ ENDICOTT OIL
11.Present Well Condition Summary:
Total Depth measured , 12,090 feet Plugs measured 4,424 feet
true vertical , 10,216 feet Junk measured N/A feet
Effective Depth measured 4,424 feet Packer measured N/A feet
true vertical 4,148 feet true vertical N/A feet
Casing Length Size MD ND Burst Collapse
Structural
Conductor 110' 30 110' 110'
Surface 4,737' 10-3/4" 4,737' 4,423' 3,580psi 2,090psi
Intermediate
Production
Liner
t�14E0 JAN 1 L:U .
Perforation depth Measured depth See Attached Schematic feet
True Vertical depth See Attached Schematic feet
Tubing(size,grade,measured and true vertical depth) 4-1/2" N/A 80' 80'
Packers and SSSV(type,measured and true vertical depth) N/A N/A N/A N/A
12.Stimulation or cement squeeze summary: N/A
Intervals treated(measured): N/A
Treatment descriptions including volumes used and final pressure: N/A
13. Representative Daily Average Production or Injection Data
Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure
Prior to well operation:
Subsequent to operation:
14.Attachments(required per 20 AAC 25.070,25.071,&25.283) 15.Well Class after work:
Daily Report of Well Operations 0 Exploratory❑ Development❑✓ - Service ❑ Stratigraphic ❑
Copies of Logs and Surveys Run ❑ 16.Well Status after work: Oil ❑ Gas ❑ WDSPL❑
Printed and Electronic Fracture Stimulation Data ❑ GSTOR ❑ WINJ ❑ WAG ❑ GINJ ❑ ,0 SUSP Q SPLUG El
17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O.Exempt:
Contact Taylor Wellman Email twellmanta�hilcorp.com
Printed Name Taylor Wellman Title Operations Engineer
Signature // Phone 777-8449 Date 9/8/2015
VTC q/�` // RBDMS SEP 10 2015
Form 10-404 Revised 5/2015 4, rnA,..., Submit Original Only
• • •
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
Suspended Well Inspection Report
Date Inspected: 08/21/15
Inspector: Lou Grimaldi Operator: Hilcorp Alaska,LLC
Well Name: MPI 1-59 Oper.Rep: Larry Mc Bride
PTD No.: 196-022 Oper.Phone: 659-6530
Location Verified? Yes Oper.Email: Imcbride@hilcorD.com
If Verified,How? Other(specify in comments)
Onshore/Offshore: Offshore
Suspension Date: 02/21/96 Date AOGCC Notified: 08/17/15
Sundry No.: 96-035 Type of Inspection: Subsequent
Wellbore Diagram Avail.? Yes
Well Pressures(psi): Tubing 0 Photos Taken? Yes
IA 0
OA 0
Condition of
Wellhead:
Weathered,valves operate good.
Condition of
Surrounding Surface
Location: Gravel,floor greating are clean.
Follow Up Actions
Needed: None
Comments:
Map on location
Attachments: 1-Photo of wellhead REVIEWED BY:
1-Pad Map Insp.Supry
1-Wellbore Schematic Comm
PLB 12/2014 Suspended Well Inspection Form MPI 1-59
• TREE: 4-1/16"/5000 ps eron man gate w/cap
• R.T.ELEV=55.1' WELLHEAD: 5000 psi/F SLIMHOLE
B.F.ELEV=16.1'
1 80'OF 4-1/2"
TUBING
"01111--- TOP OF PLUG
I hIrorn
10-3/4" 45.5#/FT L-80 BTC
I 4,424'
4737' '
CEMENT ABANDONMENT PLUG
'4111111"-- BOTTOM OF PLUG
NOTE: This is a dry hole 5,228'
temporary abandonment. No
7-5/8"casing was run. The SAFETY NOTES:60 READINGS
AVERAGE 230-260 PPM ON A/L&GAS
cement plugs were wt INJECTORS.
checked
and pressure tested to 1500
psig.
CEMENT PLUG BACK
10,888'
PBTD
12,090'
Date By Comments ENDICOTT WELL: 1-59 / 0-24
3/2/96 JTP INITIAL COMPLETION API NO. 50-029-22644
COMPLETION DIAGRAM
.. •47-"
e.
"t 4 a'' s' h .. 1t e
..„, •.!%.0,1:7-#:-...-•.•. ..,.•......,t.„-,..:.. .,;- .•-•- fts .,,,,
' k�r` ''' d °--'� s.
oe s', +, t s.?y k }a a ':h s • - ?o ., w.
r`" _ "' .fit* ' '�v+ i9 tb �.;w .. .. § :' ! a.; ^ »
t4 ay.'.! t�r +#"i:} �wtr C rt# d • i ' {r "moi= .'•••777:.•';.:.e.,,...,„,„,„4,,,,,,,,-;-1'1,••-•
, ten,.
5#Ar, k N+}�` �a,r• ak 1 "� :'•"-"'•''.4''-';-•-:-;•
Y, y . ,. wn `.'. ',7 +.....ns x,�7�.S.r
{ Y .V °p1 n. t t .. < ,4;., »x ': .air a--r sAt',�_. '''''4..-"" .
FzSid> J*� r °r_ 'u�CtA+ ,M,$11$4-&", e r' .<. a'•. ., '- .,. a, +,,.
t #; abs$$ k"'^r
i ,,��yy N."�t
a
,. ,
gg
,,,,... ,,...ii..„.... ..:::• .: .. ..„:,•••:.:•:::„,,,..„..,,!.:,,,:.,,:
" "
lvcfr '44!' {9 d "'"�.. dR F •tVi -kts b • . •...:„.„,,,....: ....,,:, •,,......:::! .1. . .. , „...,:.:.„S ^ID'":, .. va
. a � } t t •'a G? t • p� 'x ry{
....:,„*. , :,.-
., ,,„...,..„,„„,„,„,„:„......„,, ,,,,... .
b ter n� s, 3 ;;, b , ..
VC''��f } t �R ;i '$�y q <4 '" 4 Yf+k.,lfPTM `",'".�3 f "',h_ • .-',1:0,00:1.:.;•,,,,„........ _:„. t,„ 3 •Y'tL« .
x°rk Aab {.y° Y s ._.
k y� ,�., :,,,,,,ii.t8T4rti.:.i.,..i,",44.,"0-„4...,:!:.1?•::::.... � 't.�,. iK wn # # asLI II " r
,` 'e t # .."• �, u�t! %r ; r>. '.-b n11:4 #' l"1•` . , cd - ".w ,` ..
, ' yr. 'r y5 '?v.i 77--:-'7"-- -•••-•—•;,. S 7, / :_
' , : t,�°qty a �a {.+, r� ., r _. i „"L� "
•
•
�rru +�t tV 'i fr *by?!gr +, M ' ..�+ 5�w.
f
10/
*h+` '154/ :K Y R 1.4411(":4. "0"4"1•y i l .I °�„ s 7
Yrz } 'i tf�#. ;" 'j'bfl 1"-w } ��++'^'�� 5..f, t?
•
, '!+�'b }AAs 3k v ' -'..,&-.4',":',i,"7-'--44.$•
, -.4', 4"" ° $ ' rry A � r
i 'r"SSI+# � u' e�` � sS' 1'1. "i•-."-i.;.1011145:14".. ,
�t�bS�.,�� � Y 3i 'h ��' 9 e.y� , A ":•';'--J"":46$1"$$$$$`40$-: °�i.' -- (i 01:414.,..:4:::7,-
„U: ee�.... ru,..
aw k r ,$.
� •
I' { ft' ar .ni ka "e ,� "S 1 ' ' • Jw 3,14 ttq 1.4.4. 4 .ra + ,, ii Vi..r t. .. •-,11#1!"•''' ?,0•4.-'''''''''''' '•' fr'C'•"k-.
fg#
•
•
x
..
_
�” -D C +F§ , F$ti1a, `�i i prf iFt t , ji,.bi,s Y ib6 tA• gla, ^ i ,' ffi qi= rr9 yp
x
it 11-
It
:;.,:f',A." ..,•:•44trAtt•jf,',•'•' ,,•••,'-•**;"•, ',.' ,'•• -I i ,
1:1'4f ":017",iiit.,.:,-"ii,,,.::'..'•1•
, ,
401,
5s 4 N•
" i x ,tx:« ,,Ai q
t. + i,ra - ba' - .,ir,i 9 ��, Y {.{ • j
•
ti.. A � ..�A k,�„r -
` `� Ad : S;AAv s ...
_
147°5 147°57'30"W • 147°57'0"W
1
•
DUCK
ISLAND --1 ENDEAVOR
UNIT ;9 \ ISLAND Ho
m mil
E �,
-_ 13 ENDICOTT MAIN
off_ , PRODUCTION ISLAND
(MPI)
el. S '',
ifill ,,,,t
c ,,j111 .
N ,
r
111110 „
Ili
011111
Sec!-36' `` o
c::/-4.4)" U012N016E
�� �il MPI 1�3 ��'
MPI 1-59
o
,, loggia #
Z 1\\ � 01,J
o_ Z
\ o
p \ N
•, t o
Y
®O\•
\
Legend
• Well Rows
Existlng Plpellne(Above Ground)
`, Q ori and Gas Une Boundary
1 I I
fl Duck Island Unit
Endicott MPI 0 Alaska StatePlane Zone 3 NAD 1983(Feet)
100 200 (N)
��.,.�F��••.w.�.r, Well Rows Meters
Map Date:9/8/2015 Facility Map - Figure 1 0 500 1,o0eet
•
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
Suspended Well Inspection Report
Date Inspected: 08/20/15
Inspector: Chuck Scheve Operator: Hillcorp
Well Name: Endicott 1-59 - Oper.Rep: Larry McBride
PTD No.: 1960220 Oper. Phone: 907-659-6700
Location Verified? Yes Oper.Email: Icmcbridefthilcorp.com
If Verified,How? Other(specify in comments)
Onshore/Offshore: Offshore
Suspension Date: 02/21/96 Date AOGCC Notified: 08/18/15
Sundry No.: 196-035 Type of Inspection: Subsequent
Wellbore Diagram Avail.? yes
Well Pressures(psi): Tubing 0 Photos Taken? No
IA 0
OA 0 •
Condition of
Wellhead:
Manual valve only
Condition of
Surrounding Surface
Location: Good
Follow Up Actions
Needed:
Comments:
Location verified by location map
SCANNED SEP 0 7 20it
Attachments: none REVIEWED BY:p "
Insp.Supry 53 11/3/15-
`-
Comm 1
PLB 06/2014 2015-0820_Suspend_DIU_1-59_cs.xlsx
•
Post Office Box 244027
n ft r_ Anchorage,AK 99524-4027
Hilcorp Alaska,LLC ,JUL 3 0 2O1j 3800 Centerpoint Drive
Suite 100
Anchorage,AK 99503
LOGCC
Phone: 907/777-8300
Fax: 907/777.-8301
July 29, 2015
Commissioner Cathy Foerster / 0
Alaska Oil & Gas Conservation Commission I?
333 West 7th Avenue, Suite 100
Anchorage, AK 99501
Re: Duck Island Unit Well Renaming Request
Dear Commissioner Foerster,
Hilcorp Alaska, LLC (HAK) requests a change to the naming convention of Duck Island
Unit wells to remove the unused suffixes at the end of each well name. Well names
currently include a forward slash "I" followed by an obsolete bottom hole location
designator. HAK would like to retain the well number as well as the "A, B, C...." sidetrack
designations but remove the "/suffix". For example, "DUCK IS UNIT SDI 1-09A/L21"
would become "DUCK IS UNIT SDI 1-09A". The attached spreadsheet includes original
and new names for all Duck Island wells.
While performing the review of Duck Island well names, HAK found a single well, "DUCK
IS UNIT SDI 4-20/M35" (PTD # 1861730), that should also be modified to include an "A"
label to reflect the fact that the well is a sidetrack from the original "DUCK IS UNIT SDI
4-20/T34" (PTD# 1861500). The original wellbore, abandoned 10/13/1986, was
sidetracked to a new bottom hole location completed on 9/9/1987. This well appears to
be one of the first sidetracks performed at Endicott. While the bottom hole code was
changed, no letter was added to reflect the sidetrack. "DUCK IS UNIT SDI 4-20A" is also
included on the attached spreadsheet.
Sincerely,
Wyatt Rivard
Well Integrity Engineer
Hilcorp Alaska, LLC
CC Dave Roby
Victoria Loepp
Orig • New
API_WeliNo PermitNumber WellName WellNumber WellNumber
50029218010000 1880370 DUCK IS UNIT MPI 1-01/J19 1-01
50029226010000 1951500 DUCK IS UNIT MPI 1-03/P16 1-03
50029216050000 1861060 DUCK IS UNIT MPI 1-05/020 1-05
50029217430000 1870810 DUCK IS UNIT MPI 1-09/J18 1-09
50029217430100 1970290 DUCK IS UNIT MPI 1-09A/L21 1-09A
50029221070000 1901570 DUCK IS UNIT MPI 1-11/SN4 1-11
50029223610000 1930560 DUCK IS UNIT MPI 1-15/P25 1-15
50029221000000 1901500 DUCK IS UNIT MPI 1-17/SN2 1-17
50029221000100 1961990 DUCK IS UNIT MPI 1-17A/I17 1-17A
50029225690000 1950930 DUCK IS UNIT MPI 1-19/118 1-19
50029220050000 1900020 DUCK IS UNIT MPI 1-21/K25 1-21
50029225100000 1941280 DUCK IS UNIT MPI 1-23/015 1-23
50029217220000 1870420 DUCK IS UNIT MPI 1-25/N22 1-25
50029217220100 1970750 DUCK IS UNIT MPI 1-25A/K22 1-25A
50029216930000 1870090 DUCK IS UNIT MPI 1-27/P20 1-27
50029216690000 1861810 DUCK IS UNIT MPI 1-29/M25 1-29
50029225620000 1950720 DUCK IS UNIT MPI 1-31/M21 1-31
50029225770000 1951070 DUCK IS UNIT MPI 1-33/M23 1-33
50029225770100 1980870 DUCK IS UNIT MPI 1-33A/L24 1-33A
50029225770200 1982550 DUCK IS UNIT MPI 1-33B/L24 1-33B
50029225770300 2050040 DUCK IS UNIT MPI 1-33C/M24XX 1-33CXX
50029216720000 1861840 DUCK IS UNIT MPI 1-35/025 1-35
50029217480000 1870900 DUCK IS UNIT MPI 1-37/P24 1-37
50029218270000 1880630 DUCK IS UNIT MPI 1-39/P17 1-39
50029218270100 2061870 DUCK IS UNIT MPI 1-39A/N-16 1-39A
50029217130000 1870320 DUCK IS UNIT MPI 1-41/023 1-41
50029218640000 1881050 DUCK IS UNIT MPI 1-43/P26 1-43
50029219910000 1891240 DUCK IS UNIT MPI 1-45/Q26 1-45
50029216250000 1861310 DUCK IS UNIT MPI 1-47/021 1-47
50029216250100 1972030 DUCK IS UNIT MPI 1-47A/M20 1-47A
50029218410000 1880780 DUCK IS UNIT MPI 1-49/P21 1-49
50029223040000 1921190 DUCK IS UNIT MPI 1-51/V20 1-51
50029225010000 1941120 DUCK IS UNIT MPI 1-53/Q20 1-53
50029217880000 1880210 DUCK IS UNIT MPI 1-55/R25 1-55
50029218730000 1881140 DUCK IS UNIT MPI 1-57/R23 1-57
50029226440000 1960220 DUCK IS UNIT MPI 1-59/024 1-59
50029225200000 1941420 DUCK IS UNIT MPI 1-61/020 1-61
50029219050000 1890060 DUCK IS UNIT MPI 1-63/T22 1-63
50029226270000 1951880 DUCK IS UNIT MPI 1-65/N25 1-65
50029226270100 2032120 DUCK IS UNIT MPI 1-65A/N27 1-65A
50029219850000 1891140 DUCK IS UNIT MPI 1-67/T20 1-67
50029220200000 1900290 DUCK IS UNIT MPI 1-69/V19 1-69
50029215680000 1860630 DUCK IS UNIT MPI 2-02/P18 2-02
50029215850000 1860820 DUCK IS UNIT MPI 2-04/M19 2-04
50029216990000 1870180 DUCK IS UNIT MPI 2-06/J22 2-06
50029217710000 1880040 DUCK IS UNIT MPI 2-08/K16 2-08
50029223020000 1921170 DUCK IS UNIT MPI 2-12/Q16 2-12
50029216390000 1861490 DUCK IS UNIT MPI 2-14/016 2-14
50029218850000 1881340 DUCK IS UNIT MPI 2-16/M16 2-16
50029220320000 1900430 DUCK IS UNIT MPI 2-18/L16 2-18
50029220480000 1900600 DUCK IS UNIT MPI 2-20/L15 2-20
50029219310000 1890340 DUCK IS UNIT MPI 2-22/L14 2-22
Pages NOT Scanned in this Well History File
XHVZE
This page identifies those items that were not scanned during the initial scanning project.
They are available in the original file and viewable by direct inspection.
File Number of Well History File
PAGES TO DELETE
Complete
RESCAN
[] Color items - Pages:
Grayscale, halftones, pictures, graphs, charts-
Pages:
Poor Quality Original- Pages:
[] Other- Pages:
DIGITAL DATA
[] Diskettes, No.
[] Other, No/Type
OVERSIZED
[] Logs of various kinds
[] Other
COMMENTS:
Scanned by: Bevedy~Vincent Nathan Lowell
Date: ~ ,~,%~,'~) IslL.~_~
[] TO RE-SCAN
Notes:
Re-Scanned by: Be~edy Dianna Vincent Nathan Lowell Date: ~si
• •
bp
BP Exploration (Alaska) Inc. K ',
Attn: Well Integrity Coordinator, PRB -20
Post Office Box 196612
Anchorage, Alaska 99519 -6612
May 22, 2012
Mr. Jim Regg �. 4 Alaska Oil and Gas Conservation Commission 96•-c)
333 West 7 Avenue
Anchorage, Alaska 99501
Subject: Corrosion Inhibitor Treatments of Endicott Row 1
Dear Mr. Regg,
Enclosed please find multiple copies of a spreadsheet with a list of wells from Endicott
Row 1 that were treated with corrosion inhibitor in the surface casing by conductor
annulus. The corrosion inhibitor is engineered to prevent water from entering the
annular space and causing external corrosion that could result in a surface casing leak
to atmosphere. The attached spreadsheet represents the well name, API and PTD
numbers, top of cement depth prior to filling and volumes of corrosion inhibitor used in
each conductor.
As per previous agreement with the AOGCC, this letter and spreadsheet serve as
notification that the treatments took place and meet the requirements of form 10 -404,
Report of Sundry Operations.
If you require any additional information, please contact me or my altemate, Gerald
Murphy, at 659 -5102.
Sincerely,
Mehreen Vazir
BPXA, Well Integrity Coordinator
III'
• •
BP Exploration (Alaska) Inc.
Surface Casing by Conductor Annulus Cement, Corrosion inhibitor, Sealant Top-off
Report of Sundry Operations (10-404)
Endicott Row 1
Date: 09/24/2010
Corrosion
Initial top of Vol. of cement Final top of Cement top off Corrosion inhibitor/
Well Name _ PTD # API # cement pumped cement date inhibitor sealant date
_ ft bbls ft na gal
END1 -01 /J -19 1880370 50029218010000 1.5 0.3 _ 0.5 9/2/2010 0.85 9/23/2010
END1-03 / P -16 1951500 50029226018000 4.0 3.5 0.5 9/2/2010 5.10 9/23/2010
END1 -05 / 0 -20 1861060 50029216050000 0.3 NA 0.3 NA 1.70 9/23/2010
END1 -09 / L -21 1970290 50029217430100 6.0 5.0 0.5 8/28/2010 3.40 9/23/2010 _
END1 -15 / P -25 1930560 50029223610000 _ 4.0 3.0 0.5 9/2/2010 6.80 9/23/2010
END1 -17 /1-17 1961990 50029221000100 8.0 4.3 0.5 9/2/2010 2.55 9/23/2010
END1 -19 /1-18 1950930 50029225690000 7.0 9.3 0.5 9/2/2010 4.25 9/23/2010
END1 -21 / K -25 1900020 50029220050000 2.5 1.5 0.5 9/2/2010 1.70 9/23/2010
END1 -23 / 0-15 1941280 50029225100000 12.0 12.5 0.5 9/2/2010 1.70 9/23/2010
END1 -25 / K -22 1970750 50029217220100 5.0 1.5 0.5 9/2/2010 5.10 9/23/2010
END1 -27 / P -20 1870090 50029216930000 8.0 4.3 0.5 9/2/2010 2.55 9/23/2010
END1 -29 / M -25 1861810 50029216690000 2.0 1.3 0.5 9/2/2010 1.70 9/23/2010
EN01 -31 / M -21 1950720 50029225620000 5.0 1.8 0.5 9/2/2010 13.60 9/23/2010
END1 -33 / L -24 1982550 50029225770200 1.5 0.3 0.5 9/2/2010 3.40 9/23/2010
END1 -35 / 0 -25 1861840 50029216720000 8.0 4.8 0.5 9/2/2010 3.40 9/23/2010
END1 -37 / P -24 1870900 50029217480000 0.5 NA 0.5 NA 4.25 9/23/2010
END1 -39A / N-16 2061870 50029218270100 0.5 NA 0.5 NA 6.80 9/23/2010
END1 -41 / 0-23 1870320 50029217130000 8.0 5.2 0.5 9/2/2010 4.25 9/23/2010
END1 -43 / P -26 1881050 50029218640000 2.0 0.5 0.5 9/2/2010 3.40 9/23/2010
END1 -45 / 0-26 1891240 50029219910000 1.5 0.3 0.5 9/2/2010 1.70 9/24/2010
END1 -47A / M -20 1972030 50029216250100 1.0 0.1 0.5 9/2/2010 3.40 9/24/2010
END1 -49 / P -21 1880780 50029218410000 1.0 0.8 0.5 9/2/2010 3.40 9/24/2010
END1 -51 / V -20 1921190 50029223040000 1.5 0.3 0.5 9/2/2010 1.70 9/24/2010 _
END1 -53 / 0 -20 1941120 50029225010000 9.0 4.2 0.5 9/2/2010 1.70 9/24/2010
END1 -55 / R-25 1880210 50029217880000 1.3 0.1 0.5 9/2/2010 1.70 9/24/2010
END1 -57 / R -23 1881140 50029218730000 3.0 1.3 0.5 9/2/2010 5.10 9/24/2010
�END1 -59 / 0 -24 1960220 50029226440000 3.0 1.3 0.5 9/2/2010 0.85 9/24/2010
END1 -61 /0-20 1941420 50029225200000 8.0 6.8 0.5 9/2/2010 2.55 9/24/2010
END1 -63 / T -22 1890060 50029219050000 8.0 4.1 0.5 9/2/2010 2.55 9/24/2010
END1 -65A / N-27 2032120 50029226270100 8.0 5.8 0.5 9/2/2010 3.40 9/24 /2010
END1 -67 / T -20 1891140 50029219850000 0.5 NA 0.5 NA 1.70 9/24/2010
END1 -69 / V -19 1900290 50029220200000 15.0 10.3 0.5 9/2/2010 0.85 9/24/2010
•
•
~~a~~ Oo ~ a~a~~(G~ /,E.....~..~,.E.,~
Gary Preble
Data Management Engineer
BP Exploration (Alaska), Inc.
P.O. Box 196612
Anchorage, AK 99519-6612
Re: Endicott Field, Endicott Oil Pool, 1-59 / 0-24
Sundry Number: 310-264
Dear Mr. Preble:
~~
~/ ~ ..._.
1`
~ .. ~._r' ~ ._~~,~
Enclosed is the approved Application for Sundry Approval relating to the above
referenced well. Please note the conditions of approval set out in the enclosed
form.
As provided in AS 31.05.080, within 20 days after written notice of this
decision, or such further time as the Commission grants for good cause shown,
a person affected by it may file with the Commission an application for
reconsideration. A request for reconsideration is considered timely if it is
received by 4:30 PM on the 23rd day following the date of this letter, or the
next working day if the 23rd day falls on a holiday or weekend.
Sincerely,
Daniel T. Seamount, Jr.
d Chair
N
DATED this ~ day of September, 2010.
Encl.
•
BP Exploration (Alaska) Inc.
Attn: Well Integrity Coordinator, PRB-20
Post Office Box 196612
Anchorage, Alaska 99519-6612
August 24, 2010
•
by
~~C~
Mr. Daniel Seamount, Chairman '-~ ~ 20~~~
Alaska Oil and Gas Conservation Commission ,w ~, ~,~~
333 West 7th Avenue ~ ,_x ~~~ ~~ ~~t'+~lissi~tr
Anchorage, Alaska 99501 r "~~""'~~'~~'
Subject: Duck Island Unit MPI 1-59/024 (PTD # 1960220)
Suspended Well Inspection Report (10-404)
Application for Renewal of Existing Suspension (10-403)
Dear Mr. Seamount,
BP Exploration (Alaska) Inc. (BPXA) completed an AOGCC witnessed suspended well
inspection of Duck Island Unit well MPI 1-59/024 on 8/3/10. Enclosed is a Report of
Sundry Well Operations (10-404) with attachments documenting the inspection and the
current condition of the well (reference 20 AAC 25.110 (e) and (f)). Recent well events
from this well indicate that this well is mechanically sound. Specific attachments
include:
• Suspended Well Site Inspection form documenting the well pressures and site
condition
• Wellbore diagram illustrating the current configuration of the well
• Pad map and aerial photo showing well location and other wells within one-
quartermile radius of the surface location
• Photograph showing the condition of the wellhead and the surrounding location
Duck Island Unit well MPI 1-59/024 was suspended on 2/21/06. It is located on a pad
with active wells and/or service wells.
Based on this information, BPXA requests approval for renewal of the existing
suspension status for this well. Attached is an Application for Sundry Approval (10-
403) with a technical justification summarizing the information on the current status and
condition of the well (reference 20 AAC 25.110 (a), (b), (e), (h) and (i)).
In summary, BPXA believes Duck Island Unit well MPI 1-59/024 is mechanically sound
and secure and will meet the requirements for renewal of suspended status.
•
If you require any additional information, please contact me at 564-5637, Torin
Roschinger/Jerry Murphy at 659-5102 or Chris Stone 564-5518.
Sincerely,
R. Steven Rossberg
BPXA, Wells Operations Manager
Attachments:
Report of Sundry Operations (Form 10-404) with attachments:
Suspended Well Site Inspection form
Wellbore Schematic
Well location plat and aerial photo
Pictures of wellhead and location
Application for Sundry Approval (Form 10-403) with attachment:
Technical Justification
Cc:
Roschinger/Murphy
Harry Engel
Mike Bill
Chris Stone
Jennifer McLeod
Gary Preble
{ ~ STATE OF ALASKA ~ { O
ALASK~L AND GAS CONSERVATION COMMISSI~ ( ~
dr
APPLICATION FOR SUNDRY APPROVALS _!'
~n aar. ~~ ~Rn
.,.D
1. Type of Request: Abandon ^ Plug for Redrill ^ Perforate New Pool ^ Repair Well ^ Change Approved Program ^
Suspend ^ Plug Pertorations ^ Perforate^ Pull Tubing ^ Time Extension ^
Operation Shutdown ^ Re-enter Susp. Well ^ Stimulate^ Alter Casing ^ Other: RENEW SUSPENSION
2. Operator Name: 4. Curcent Well Class: 5. Permit to Drill Number:
BP Exploration (Alaska), Inc. Development ^ Exploratory ^ 196-0220-
3. Address: P.O. Box 196612 Stratigraphic ^ Service ^ 6. API Number:
Anchorage, AK 99519-6612 50-029-22644-00-00 -
7. If pertorating, closest approach in pool(s) opened by this operation to nearest 8. Well Name and Number:
property line where ownership or landownership changes:
Spacing Exception Required? Yes ^ No ^ 1-59/0-24
9. Property Designation (Lease Number): 10. Field/Pool(s): ,
ADLO-312828 ~ ENDICOTT Field / ENDICOTT Pool
11. PRESENT WELL CONDITION SUMMARY
Total Depth MD (ft): Total Depth TVD (ft): Effective Depth MD (ft): Effective Depth TVD (ft): Plugs (measured): Junk (measured):
12090 - 10216.39 ~ 4424 4148 4424' NONE
Casing Length Size MD TVD Burst Collapse
Structural
Conductor 110 30" SURFACE 110 SURFACE 110
Surtace 4737 10-3/4" 45.5# L-80 42' 4737 42 4423 5210 2480
Intermediate
Production
Liner
Perforation Depth MD (ft): Perforation Depth TVD (ft): Tubing Size: Tubing Grade: Tubing MD (ft):
NONE - - 4-1/2" URFACI 80
Packers and SSSV Tvpe: NONE Packers and SSSV MD and TVD (ft):
12. Attachments: Description Summary of Proposal Q 13. Well Class after proposed work:
Detailed Operations Program ^ BOP Sketch ^ Exploratory ^ Development ~ - Service ^
14. Estimated Date for 15. Well Status after proposed work:
Commencing Operations: Oil ^ Gas ^ WDSPL ^ Suspended , ^~
16. Verbal Approval: Date: WINJ ^ GINJ ^ WAG ^ Abandoned ^
Commission Representative: GSTOR ^ SPLUG ^
17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Gary Preble
Printed Name Gary Preble Title Data Management Engineer
Signature Phone Date
564-4944 /~- Prepared by Gary Preble 564-4944
COMMISSION USE ONLY
witness Sundry Number: 3t ~ '~~
resentative ma
Commission so that a re
Conditions of a
roval: Notif
p
y
pp
y
Plug Integrity ^ BOP Test ^ Mechanical Integrity Test ^ Location Clearance ^
Other: ~-~c.rn~ ~~u ` ,p l~cGc,...~..,,~ 2~ pro Ott' ~ Z ~ 14~L ZS
d Y l~~ ~41 ~ f ~ "~tS L.f
' `' ~ ~~ ~~~lf
Subsequent Form Required: ~oy~,~ ~ f~iS ~~~~ (~:~;!£~ r ~' f'.,. (+~3 ~+ .. _ .
,~au.~ ~, ~r'tR~ry)
~~' ~~t~~~..'f P
APPROVED BY
COM IONER THE COMMISSION
A
b
Date: ~ 1
pproved
y:
s
SIfI~
Form 10-403 Revised 1!2010 ~~ ~ ~..,,, ~ ~ ~ ' ~ Submit in Dupli~ `
Duck Island Unit well 1-59/024
Technical Justification for Application for
Renewal of Suspension Status
August 24, 2010
Well Status
Duck Island Unit well MPI 1-59/024 was drilled to TD and suspended 2/21/96 after the
zones of interest were found to be water swept. Surface casing was run to 4,737' and
the open hole extends to TD at 12,090'. A plug was left from 10,888' to 12,090'. A
second cement plug extends from 4,424 to 5,228' MD.
The well is mechanically sound as indicated by a passing MIT-IA to 3000 psi and a
passing MIT-OA on 12/10/04. The well will not allow the migration of fluids, will not
damage freshwater or producing or potentially producing formations, will not impair the
recovery of oil or gas, and is secure, safe and not a threat to public health.
The strata through which the well was drilled is neither abnormally geo-pressured or
depleted.
Condition of the Wellhead and Surface Location
Duck Island Unit well MPI 1-59/024 is located on an active, well maintained pad with
clean gravel. The pit and surrounding area are in good condition. There is no
discoloration and no sheens on the pad, pits, or in nearby water.
The well pressure readings are T/I/O = 0/0/0.
Request
BPXA requests approval for renewal of the existing suspension status for MPI 1-
59/024.
A variance to the provisions of 20 AAC 25.110 (c) (2) is also requested under 20 AAC
25.112 (i) to allow the well to remain as suspended in its current condition. All
hydrocarbon intervals are isolated and there are no underground sources of fresh water
in this area.
STATE OF ALASKA
ALASKA~AND GAS CONSERVATION COMMISSION
REPORT OF SUNDRY WELL OPERATIONS
1. Operations Abandon ^ Repair Well ^ Plug Perforations ^ Stimulate^ Other ~ INSPECT
Performed: Alter Casing ^ Pull Tubing^ Perforate New Pool ^ Waiver^ Time Extension ^ WELL
Change Approved Program ^ Operat. Shutdown ^ Perforate ^ Re-enter Suspended Well ^
2. Operator BP Exploration (Alaska), Inc. 4. Well Class Before Work: 5. Permit to Drill Number:
Name: Development Q Exploratory ^ ~ 196-0220
3. Address: P.O. Box 196612 Stratigraphic^ Service ^ 6. API Number:
Anchorage, AK 99519-6612 ~ 50-029-22644-00-00
8. Property Designation (Lease Number) : 9. Well Name and Number:
ADLO-312828 ` 1-59/0-24
10. Field/Pool(s):
w
ENDICOTT FIELD / ENDICOTT POOL
11. Present Well Condition Summary:
Total Depth measured 12090 feet Plugs (measured) 4424" feet
true vertical 10216.39 feet Junk (measured) None feet
Effective Depth measured 4424 feet Packer (measured)
true vertical 4148 feet (true vertical)
Casing Length Size MD TVD Burst Collapse
Structural
Conductor 110 30" SURFACE - 110 SURFACE - 110
Surface 4737 10-3/4" 45.5# L-80 42' - 4737 42 - 4423 5210 2480
Intermediate
Production
Liner
Liner
Perforation depth: Measured depth: NONE - _
True Vertical depth: _ _ _
Tubing: (size, grade, measured and true vertical depth) 4-1 /2" 0 SURFACE - 80 SURFACE - 80
Packers and SSSV (type, measured and true vertical depth) NONE
12. Stimulation or cement squeeze summary:
~
I ~ ~~ ~ `~ '~ ~
Intervals treated (measured): ,, -~ j
, 4~ `
I
J ~ .,
a y r f` _
~1"t'~IISSIO~
Ie~C~~ ~"F ~ ~S~ ~'~
Treatment descriptions including volumes used and final pressure: ' J
r r.
~ ife1i ap°°..~F^
13. Representative Daily Average Production or Injection Data
Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing pressure
Prior to well operation: SUSPENDED
Subsequent to operation:
14. Attachments: 15. Well Class after work:
Copies of Logs and Surveys Run Exploratory^ ~ D velopment ^~ Service ^
Daily Report of Well Operations X 16. Well Status after we SUSPENDED Oil Gas WDSPL
GSTOR ^ WAG ^ GINJ ^ WINJ ^ SPLUG ^
17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt:
NA
Contact Gary Preble
Printed Name Gary Pre Title Data Management Engineer
Signature Phone 564-4944 Date ~~~°
r .,,..,~ ~~ ~
DMS AUG 2 5 2010 ~-- 9~~~w
•
su~pe~tc4ed ~ii' Sif:e irts~aec~iort ~ot•rrt
• Notify AOGCC inspectors at least 10 days prior to inspectior'r to allow witness
Well Name: DUCK 1S UNIT MPI 1-59/024 Field/Pool: ENDICO"f'T / ENDICO'T'"1' O1L
Permit # {1'TD): 19G-022 API Number: 50029226440000
Operator: QP EXPLORATION (ALASKA) INC mate Suspended:
Surface Loration: Section: 36 Twsp: 12N Range: 16E
Nearest active pad or road: Endicott Island
212 1 11 9 9 6
Take fo Location
Digital camera
brief wel! history
Latest Sundry or Completion report
Past Site Visit documentation
Pressure gauges, fittings, tools
FMC w/single MV EMC wellhead with casing valves.
Condition of Surfac~_Lacatiort AOGCC requires:
1) a description of tine condition of the surface location, including discoloration, fluids or sheens visible
on tare ground or in any nearby water,
2) photographs showing the condition of the location surrounding the well
General location condition: Clean
f'ad or location surface:
Location cleanup needed
17its condition: No pit
Clean, dry and level
No
Surrounding area condition: Clean
Water/fluids on pad: None
Discoloration, Sheens on pad, pits or water:
Samples taken: None
Access road condition: Good
Photagraplzs taken (Jt and description): None
Condition of Wellhead AOGCC requires:
1) a description of the condition of the wellhead, 2) we}I pressure readings, whore practicable,
3) photograpl~rs showing the wellhead condition
Wellhead/tree/valve description, condition:
Good condition
Cellar description, condition, fluids: 1'
Rat I-late: 2' of water to rat hole
Wellhouse or protective barriers: None
WeII identification sign: None
Tubing Pressure (or casing if no tubing): 0 psi
Annulus pressures: 0 psi IA 0 psi OA
Wellhead Photos taken (# and description):
1 -wellhead
Work Requn'ed: Ordered wellhead sign.
Operator Rep (name and signature): ,Jerry Murphy -,,__~~-,,.,~~,~, 'j•
AOGCC inspector: Chuck Scheve Other Observers:
Inspection Date: II/3(2010 AOGCC Notice Date:
Time of arrival: 1:10 PM Time of Departure:
Site access method: Drive
water in cellar'
Map showing well location /Aerial phofos
Wellbore diagram showing downl~ole condition
Site clearance documentation
Sample containers for fluids on or near pad
None
Ryar~i Holt
7/27/2010
1:20 PM
i'r~~r
TREE: 41/16" / 5000 psi /Cameron mangate w/ cap
R.T. ELEV = 55.1' WELLHEAD: 5000 psi /FMC SLIMHOLE
B. F. ELEV= 16.1'
80' OF 41/2"
TUBING
10-3/4" 45.5#/FT L-80 BTC ~- TOP OF PLUG
4,424'
473T
CEMENT ABANDONMENT PLUG
BOTTOM OF PLUG
NOTE: This is a dry hole 5,228'
temporary abandonment. No
7-618" casing was run. The
cement pl ugs were wt
checked
and pressure tested to 1500
ps ig.
CEMENT PLUG BACK
10,888'
PBTD
12,090'
Date By Comments ENDICOTT WELL: 1-59 / 0-24
3/2/96 JTP INITIAL COMPLETION API NO. 50-029-22644
COMPLETION DIAGRAM
BP EXPLORATION (ALASKA), INC
bs14495a3.dgn
:N a
v
y,
:r ~ ~ ~,
~''
,~
,~`~~
~'
g
~~
~.
~ °~~~ z ~
,~
~
~~# ~
~_:
'
°
~.
~ ` ~ 1 ,..
~ " i
~
f ~
"~
~.
~
. ~
~'
~
`
~ '~
~
. ~ ~' ,
~
!
~
& ~ i
~~~ p
FS
~
~ M
~r
y`
k mot„ x
e Y
PI ~ Endeavor Is.
my 13, 2009
Approximate Scale: 1"=300'
2009-18c-1-13
AFRO-111fTR1~
x ~ ;,~ ~
< ~ ~ ~ r~;
~~ is
'~
c:LO~M-DOc
PERMIT
DATA
AOGCC Individual Well
Geological Materials Inventory
T DATA PLUS
Page:
Date:
RUN
1
02/25/98
RECVD
96-022
96-022
7051
BHP
~ DIFL/ZDL/CN/GR
q=~BL & SEPIA
02/28/96
03/01/96
96-022
96-022
CNL/GR
COMP Z-DENS
~/BL & SEPIA
J~BL & SEPIA
03/01/96
03/01/96
96-022
96-022
DIFL
SSVD
10-407
DAILY WELL OPS
SEPIA /0~qJ-f- /lob~/
03/01/96
03/01/96
9'/~/~
~/~1~
Are dry ditch samples required? yes ~. And received?
Was the well cored? yes ~ Analysis & description received?
Are well tests required? .yes ~ .... Received?
Well is in compliance
Initial
COMMENTS
T
..... ~ STATE OF ALASKA
ALAS-r.,.-, OIL AND GAS CONSERVATION C,..,,vlMISSION
WELL COMPLETION OR RECOMPLETION REPORT AND LOG
1. Status of Well Classification of Service Well
[] Oil [] Gas [] Suspended [] Abandoned [] Service
2. Name of Operator 7. Permit Number
BP Exploration (Alaska) Inc. 96-022 96-035
3. Address 8. APl Number
P.O. Box 196612, Anchorage, Alaska 99519~.~61:.2..:~_..__:.,_,.._ .~ .- 50-029-22644
4. Location of well at surface ~ ....... "" :~';~' i 9. Unit or Lease Name
3083' NSL, 2202' WEL, SEC. 36, T12N, R16E: (~ ?.)r;~:!/'~f; ! ~i,~,4~ Duck Island Unit/Endicott
At top of productive interval ~ ......~'t~ 1 ! ~t~1:,~I:~ i~ 10. Well Number
At total depth ..-XT::.L_... ;i ;;7 11. Field and Pool
374' NSL, 2924' EWL, SEC. 31, T12N, R17E ~,~,¢,~~ Endicott Field / Endicott Pool
5. Elevation in feet (indicate KB, DF, etc.) 16. Lease Designation and Serial No.
KBE = 56'I ADL 312828
I I I6' °fish°re 116' N°' °f C°mpleti°ns- 12' One
12. Date02/03/96Spudded 13. Date T.D.02/17/96Reached 14. Date Comp.,02/21Susp.,/96 or Aband. 15. Water depth,if MSLI
17. Total Depth (MD+TVD)118. Plug Back Depth (MD+TVD)I19. Directional Survey 20. Depth where SSSV set~l. Thickness of Permafrost
12090 12016 F~ 4424' 4148' F~ [] Yes [] No N/A MD ! 1465' (Approx.)
22. Type Electric or Other Logs Run
Gyro, MWD, DIFL/ZDL/CN/GR/CAL/TTRM
23. CASING, LINER AND CEMENTING RECORD
CASING SE'I-rING DEPTH HOLE
SIZE VVT. PER FT. GRADE TOP BO'FrOM SIZE CEMENTING RECORD AMOUNT PULLED
30" Struct. Drive Surface 110' Driven
10-3/4" 45.5# L-80 42' 4737' 13-1/2" 770 sx PF 'E', 567 sx 'G', 150 sx PF 'E'
24. Perforations open to Production (MD+TVD of Top and Bottom 25. .. TUBING RECORD
and interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD)
4-1/2" 8 0' N/A
MD TVD MD TVD
26. ACID, FRACTURE, CEMENT SQUEEZE, ETC.
DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED
10888'-12090' 625 sx 'G' Balanced Plug
4424'-5228' 400 sx 'G' Balanced Plug
27. PRODUCTION TEST
Date First Production IMethod of Operation (Flowing, gas lift, etc.)
Not on Production I N/A
Date of Test Hours Tested PRODUCTION FOR OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE I GAS-OIL RATIO
TEST PERIOD ·
I
Flow Tubing Casing PressureCALCULATED. OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-APl (CORR)
Press. 24-HOUR RATE
28. CORE DATA
Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips.
....~ ,~ '~
.... I.' ';: ~' ;', ",~
f-; , .';,
Form 10-407 Rev. 07-01-80
Submit In Duplicate.
Geologic Mart. 30. Formation Tests
i Measured True Vertical Include interval tested, pressure data, all fluids recovered
Marker Name
Depth Depth and gravity, GOR, and time of each phase.
(Subsea)
BHRZ 11141' 9628'
TKEK 11161' 9639' ..
K3A 11470' 9814'
K2B 11710' 9948'
K2A 12030' 10127'
31. List of Attachments
Summary of Daily Drilling Reports, Surveys
32. I hereby certify that the ~Signed is true and correct to the best of
SteveShultz Title Senior Drilling Engineer Date
~ ~ ~ ~ Prepared By Name/Number: Kathy Cam/aoamor, 564-5122
INSTRUCTIONS
GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and
leases in Alaska.
ITEM 1' Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water
supply for injection, observation, injection for in-situ combustion.
ITEM 5.' Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces
on this form and in any attachments.
ITEM 16 AND 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item
16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional
interval to be separately produced, showing the data pertinent to such interval.
ITEM 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.).
ITEM 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of
the cementing tool.
ITEM 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In,
Other-explain.
ITEM 28: If no cores taken, indicate 'none'.
Form 10-407 Rev. 07-01-80
SUMMARY OF DALLY OPERATIONS
SHARED SERVICES DRILLING - BPX / ARCO
WellName: 1-59/O-24 RigName: Doyon 15 AFE: 727104
Accept Date: 02/02/96 Spud Date: 02/03/96 Release Date: 02/21/96
Feb 3 1996 (1)
Rig moved 100 %. Rig accepted 02/02/96 @ 1800 hrs. Held safety meeting. Rigged
up Divertor. Rigged up Survey wireline unit. Ran HWDP to 800 ft (5 in OD). Made up
BHA #1 . Tested Divertor. Made up BHA #1. Drilled to 175 ft. Circulated at 175 ft.
Feb 4 1996 (2)
Circulated at 175 ft. Held safety meeting. Drilled to 1390 ft. Held safety meeting.
Drilled to 1740 ft. Repaired Mud pumps. Drilled to 2053 ft. Circulated at 2053 ft.
Pulled out of hole to 82 ft. R.I.H. to 2053 ft. Drilled to 2432 ft.
Feb 5 1996 (3)
Held safety meeting. Drilled to 3481 ft. Circulated at 3481 ft. Pulled out of hole to
2053 ft. R.I.H. to 3481 ft. Drilled to 3745 ft. Held safety meeting. Drilled to 4752 ft.
Circulated at 4752 ft. Pulled out of hole to 1013 ft. R.I..H. to 4752 ft.
Feb 6 1996 (4)
R.I.H. to 4752 ft. Circulated at 4752 ft. Pulled out of hole to 1014 ft. Pulled BHA.
Rigged up Casing handling equipment. Held safety meeting. Ran Casing to 4737 ft
(10.75 in OD). Circulated at 4737 ft. Repaired High pressure lines. Pumped
spacers -volume 100 bbl. Mixed and pumped slurry - 398 bbl. Displaced slurry -
398 bbl. Rigged up High pressure lines. Mixed and pumped slurry- 55 bbl.
Feb 7 1996 (5)
Held safety meeting. Wait on cement. Rigged down Divertor. Rigged up BOP stack.
Tested BOP stack. Held safety meeting. Installed Wear bushing. Rigged up Survey
wireline unit. Took Gyro multi-shot w/line survey. Rigged down Survey wireline unit.
Made up BHA #2. R.I.H. to 4497 ft. Drilled cement to 4652 ft. Circulated at 4652 ft.
Feb 8 1996 (6).
Held safety meeting. Tested Casing. Drilled cement to 4762 ft. Circulated at 4762 ft.
Performed formation integrity test, 15.2 ppg EMW. Drilled to 5479 ft. Held safety
meeting. Drilled to 5762 ft. Circulated at 5479 ft. Pulled out of hole to 4719 ft. R.I.H.
to 5762 ft. Drilled to 6143 ft.
Feb 9 1996 (7)
Drilled to 6143 ft. Held safety meeting. Drilled to 6758 ft. Held safety meeting. Drilled
to 6957 ft. Circulated at 6957 ft. Pulled out of hole to 1008 ft. Pulled BHA. Made up
BHA #3. R.I.H. to 4911 ft. Took MWD survey at 4911 ft. R.I.H. to 6909 ft.
Feb 10 1996 (8)
Held safety meeting. Drilled to 7590 ft. Held safety meeting. Drilled to 7954 ft.
Circulated at 7954 ft. Pulled out of hole to 6905 ft. R.I.H. to 7954 ft. Drilled to 8045 ft.
..
Feb 11 1996 (9)
Held safety meeting. Drilled to 8910 ft. Held safety meeting. Drilled to 8998 ft.
Circulated at 8998 ft. Pulled out of hole to 7950 ft. R.I.H. to 8998 ft. Drilled to 9598 ft.
Feb 12 1996 (10)
Held safety meeting. Drilled to 9849 ft. Circulated at 9849 ft. Held safety meeting.
Pulled out of hole to 8995 ft. R.I.H. to 9849 ft. Circulated at 9849 ft. Rigged up Gyro
survey instruments. Took Gyro multi-shot w/line survey. Rigged down Gyro survey
instruments. Circulated at 9849 ft. Pulled out of hole to 1008 ft. Pulled BHA.
Feb 13 1996 (11)
Held safety meeting. Made up BHA #4. Functioned downhole tools at 1005 ft.
Singled in drill pipe to 3511 ft. POOH to 1005 ft. R.I.H. to 4715 ft. Serviced Block line.
Serviced Top drive. R.I.H. to 6706 ft. Took MWD survey at 6706 ft. R.I.H. to 9849 ft.
Held safety meeting. Drilled to 10064 ft. Repaired SCR. Drilled to 10161 ft.
Feb 14 1996 (12)
Held safety meeting. Drilled to 10486 ft. Held safety meeting.
Circulated at 10734 ft. Pulled out of hole to 1005 ft.
Page
Drilled to 10734 ft.
Feb 15 1996 (13)
Held safety meeting. Pulled BHA. Retrieved Wear bushing. Tested BOP stack.
Installed Wear bushing. Made up BHA #5. R.I.H. to 6713 ft. Took MWD survey at
6713 ft. R.I.H. to 9970 ft. Washed to 10734 ft. Held safety meeting. Drilled to 11132 ft.
Feb 16 1996 (14)
Held safety meeting. Drilled to 11581 ft. Held safety meeting. Drilled to 11687 ft.
Circulated at 11687 ft. Pulled out of hole to 1011 ft. Pulled BHA. Made up BHA #6.
R.I.H. to 4832 ft.
Feb 17 1996 (15)
Serviced Block line. R.I.H. t/6713 ft. Took MWD survey at 6713 ft. R.I.H. to 11112 ft.
Washed to 11687 ft. Drilled to 11883 ft. Held safety meeting. Drilled to 12090 ft.
Circulated at 12090 ft. Pulled out of hole to 9700 ft.
Feb 18 1996 (16)
R.I.H. to 12090 ft. Held safety meeting. Circulated at 12090 ft. Pulled out of hole to
1011 ft. Pulled BHA. Rigged up Logging/braided cable equipment. Ran electric logs.
Held safety meeting. Rigged up sub-surface equipment - Drilling tool/logs. R.I.H. to
10150 ft. Rigged up Logging/braided cable equipment. Ran electric logs. R.I.H. to
10850 ft.
Feb 19 1996 (17)
..
Held safety meeting. R.I.H. to 12090 ft. Ran electric logs. POOH to 10150 ft. Ran
electric logs. Pulled out of hole to 0 ft. Rigged down sub-surface equipment - Drilling
tool/logs. R.I.H. to 1577 ft. Held safety meeting. R.I.H. to 4737 ft. Serviced Block line.
R.I.H. to 10290 ft. Circulated at 12090 ft. Mixed and pumped slurry- 127 bbl. Pulled
out of hole to 10200 ft. Circulated at 10200 ft. Pulled out of hole to 10200 ft.
Feb 20 1996 (18)
Held safety meeting. POOH t/1580 ft. POOH t/0 ft. Made up BHA #8. R.I.H. to 9600 ft.
Laid down 950 ft of 5 in OD drill pipe. R.I.H. to 10888 ft. Circulated at 10888 ft.
Pulled out of hole to 922 ft. Pulled BHA. R.I.H. to 5100 ft. Repaired Iron roughneck.
Held safety meeting. R.I.H. to 5769 ft. Circulated at 5769 ft. POOH to 5228 ft. Mixed
and pumped slurry- 82 bbl. Pulled out of hole to 4000 ft. Circulated at 4000 ft.
Pulled out of hole to 3000 ft.
Page
Feb 21 1996 (19)
Held safety meeting. Laid down 1580 ft of 3.5 in OD drill pipe. R.I.H. to 3500 ft.
Pulled out of hole to 2384 ft. R.I.H. to 4424 ft. Performed cement integrity test, 1500
psi for 15 minutes. Laid down 1767 ft of 5 in OD drill pipe. Circulated at 1000 ft. Held
safety meeting. Pulled BHA. Ran Tubing to 80 ft (4.5 in OD). Rigged down BOP
stack. Installed Xmas tree.
Feb 22 1996 (20)
Held safety meeting Rig released 02/21/96 @ 1800 hrs. Skid rig. Rig moved 20 %.
Rig waited' Equipment.
Page 4
P-07
__
;~ ~ ~ ~ ~ ~:~ ~ ~ ___. (Sec, T, R)
Su~ Csg Dep
__
Well Cum Total'~ ~ ~; Cum Mud/Ctg'~'~'~'~ ?"":?~?~ Cum Brine ~ ~ ~ Cum Water~~[~:~?~?~ Cum Dies/FP ~ ~ ~
VOLUME (BBLS' Method of displosal=pumping down outer annulus
SOURCE WELL DATE OF DIESEL/ Daily Cum,
MUD/CTGS BRINE WATER COMPLICATIONS, COMMENTS
NUMBER INJECTION FREEZE PROT. T o t a I
Page 1
PAGE NO,
******~**** SURVEY PROGRAM ***********
~.u.,r~. SHARHi SERVICES DRILLING
~u NAME 1-5~/0-~4 PH
~OCATiON i
MAGNETIC ~CLiNATiON
GRi~ CONVERGENC~ ANGLE 0~00
AP! NO~ 500292262700
APE NO~ 727104
~0~ NO~
WELL "~
AZIMUTH FROM ROTARY TABLE TO TARGET iS
TIE 'IN POiNT(TiP) : GYRO
MZASURED DEPTH ~7t5
TRUE PERT DEPTH
iNCLINATION
AZIMUTH i20~05
LAT~TUDE(N/-S) -ig08,32
DEF:(E/-[~) -i47,9571059~
TiE iH
- .
_~n NO, 2 .~'~. ' 1-59/0-2~
***~*~,~ CiRC%AR ARC ~£THO~,~
MEASUR]~
D~F'TH
ft
INTERVAL"
vEn~a~ TARGET
DEPTH SECTION
ft ft ft
?'~ON AZIMUTH ua~TuD~
INCLN, N/-S
deg de~ ft
. D~
DEPARTURE
.~or~,~m. at AZIMUTH
ft ft deg lOOft
~ 77i5~00
i0004.A:9
0,0 ~738~48 3962,70
9~,? 8820 ?~ ~Oig~A
95,4 8974,4! 4!29,91
96,2 9047,28 4192,46
31,17 !20,05 -1808,32
1~,.~ -!834
36,49 ii9,91 -!8.61
o~,55 120,38 -t891
4i:94 i2i,04 _~o~o
3573,35 40lA,AT. . 117,17.
oAoo 04 407P,sn ~7,20 2
3672,83 4131,17 !17,25 3,22
~ ~ ~ ~17 30 2,52
~,~6, 193,~
10194
t029i,!2
10387,00
10483,17
94.1 9ii5,8A
oA.2,~. 0~oo,63,,~ 4325,49
95,9 9245,05 4397,71
o; o .... ,59 4473,54
95,5 9359,34 4550,75
44,45 !20,8i -1956,4!
~.AA i22,~~ -199~,AA
,~ .~. ~,~ _, .~._.
5i,09 122~93 -2032,27
53,9i I2i,~' -2~79~82
54,$Z !21,i7 -2ii3,04
3782,04. 4258,10 117,35 ~°,67
3840,94 4327,i6 1i7,42 3,6!
3902,10 4399+60 !17,51 3,58
3966,72 4475,65 i!7,.,~° ~, 22
o~ 117, ri,Afl
40 .... ,03 4553,05 '=
10672~64
10762,92
i0857,7~
!0954 sv
1i048~28
94,0 9413,47
90,3 9465,34
94,9 95!9,70
96,8 9575,43
93,7 9629~82
4700~93
4857,28
4933 '~
;~,o: 120,25 -2i52,25
54,90 !20,36 -2189,54
55,i7 i2!,00 -2229,2!
54,5R It9,7A
. .
ii? ,78 -230s,95.
4099,05 4629,74 11'7,70 0,86
4162,85 4703,55 !17,74 0,13
4229,7i 4981,i9 117,79 0,62
4297,97 4860,25 117,83 1,22
4364,85 4936,54 117,85 i,74
95,i 9684,
96,6 974(:,07 5090,22
96,! 9794,58 5!69,37
95,8 9848,oo~' 5~o..58 ....
96=3 99'02,00 =o~A a9
54,A8 !i7~23
==.9~ i!7,~ -2o~
~ 65 ,la O~ -2414.88
56,~= ~i8,~o
. ~ .........
4433,66 5014,!2 !!7,84 0,61
4504,07 5093,33 i17,83 0,41
4574,21 5!72,52 !17,83 0,71
4644,13 5251,7$ 117,84 0,45
47!4,69 5331,77 !17,84 0~29
!i6!9,9i
ti7i8,i3
11812,89
11908,08
1200~
98,2 1.0007 =~ sa8A ~
94,8 10061,06 5564,45
9= ~ 10114 S~ .... "
98,6 10!69,53 5724,9i
55,8~ 1!8,05 -2563,6i
55,68 ii8,02 -2600,44
ss,?9 i!8,24 -2637,58
56,19 Ii~,65 -2676,56
4782,!3 5408,04 !17,84 0,23
4~54,i6 5489~53 117,84
4923,32 5567,85 117,54 0,21
4992,78 5646,65 117,85 0,38
5064,73 5728,~8 117,66 0,40
.gyro/data
B.P. EXPLORATION
MPI UNIT, 1-59/O-24
ENDICOTT FIELD, ALASKA
Gyro Multishot Survey Of Drill Pipe
Survey date: 12 February 1996
Job number · AK0296G325
SR325.DOC
Gyrodata Incorporated
P.O. Box 79389
HouSton, Texas 77279
713/461-3146
Fax: 713/461-0920
February 28, 1996
B.P. Exploration (Alaska) Inc.
Petrotechnical Data Center, MB 3-3
900 E. Benson Blvd.
Anchorage, AK 99519-6612
Re.'
MPI. UNIT, WELL 1-59/O-24, ENDICOTT FIELD, ALASKA
Enclosed please find one (1) original, eight (8) copies and (1) disk of the completed survey of
We11#1-59/O-24
We would like to take this opportunity to thank you for using Gyrodata and we look forward
to serving you in the future.
Sincerely
Robert J. Shoup
Operations Manager
RS/£cc
Serving the Worldwide Energy Industry with Precision Survey Instrumentation
gyro/data
CONTENTS
JOB NUMBER :AK0296G325
1. DISCUSSION , SURVEY CERTIFICATION SHEET
2. SURVEY DETAILS
3. OUTRUN SURVEY LISTING
4. QUALITY CONTROL
5. EQUIPMENT AND CHRONOLOGICAL REPORT
SR325.DOC
,
gyro/data
1. DISCUSSION , SURVEY CERTIFICATION SHEET
SR325.DOC
DISCUSSION
JOB NUMBER: AK0296G325
Tool 080 was run in MPI Unit, 1-59/O-24 on ATLAS 5/16" Wireline inside drillpipe. The survey was
run without problems. After obtaining a post job MBO on tool 080, we discovered a shift in the physical
mass of the gyro. The tool was sent to Houston and re-calibrated. The new calibration has been applied
to the final survey, and reflects the corrected data in this report.
Prior to running this gyro, a Iow frequency, high G shock affected it's calibration. The post run MBO
shows this change. After applying the post run MBO and reprocessing the data with the new calibration,
we are submitting this survey with confidence that it is within our guidelines for accuracy.
SR325.DOC
gyro/data
SURVEY CERTIFICATION SHEET
JOB NUMBER' AK0296G325
The data for this survey and the calculations for this survey were obtained and performed by me
according to standards and procedures as set forth by Gyrodata Limited, true and correct to the best of
my knowledge.
TOM STODDARD
OPERATIONS ENGINEER
The data and calculations for this survey have been checked by me and conform to the standards and
procedures as set forth by Gyrodata Limited.
This report represents a directional survey of this well based on the original data obtained at the wellsite.
The data has been reprocessed with the latest calibration.
Checked by :-
ROB SHOUP
OPERATIONS MANAGER
SR325.DOC
gyro/data
2. SURVEY DETAILS
SR325.DOC
gyro/data
SURVEY DETAILS
JOB NUMBER: AK0296G325
CLIENT:
B.P. EXPLORATION
RIG:
DOYON 15
LOCATION:
ENDICOTT FIELD
WELL:
1-59/0-24
LATITUDE:
70.505000 N
LONGITUDE:
SURVEY DATE:
SuRvEy TYPE ·
DEPTH REFERENCE:
MAX. SURVEY DEPTH:
12 Februaw 1996
MULTISHOT IN 5" Drillpipe
ROTARY TABLE ELEVATION
56
4435
SURVEY TIED ONTO:
NA
SURVEY INTERVAL:
100 FT.
UTM CO-ORDINATES:
TARGET DIRECTION:
121.99
GRID CORRECTION:
N/A
CALCULATION METHOD:
MINIMUM CURVATURE
SURVEYOR:
TOM STODDARD
SR325.DOC
gyro/data
3. OUTRUN SURVEY LISTING
SR325.DOC
A Gyroda t a D i re c t i ona i Survey
for
B.P. EXPLORATION
WELL: MPI UNIT, 1-59/O-24
Location: DOYON 15, ENDICOTT FIELD, ALASKA
Job Number: AK0296G325MR
Run Date: 12-Feb-96 06:44:21
Surveyor: TOM STODDARD
Calculation Method: MINIMUM CURVATURE
Survey Latitude: 70.353000 deg. N
Sub-sea Correction from Vertical Reference: 56 ft.
Azimuth Correction:
Gyro: Bearings are Relative to True North
Proposed Well Direction: 115.830 deg
Vertical Section Calculated from Well Head Location
Closure Calculated from Well Head Location
Horizontal Coordinates Calculated from Local Horizontal Reference
A Gy r o d a t a
B.P. EXPLORATION
WELL: MPI UNIT, 1-59/O-24
Location: DOYON 15, ENDICOTT FIELD,
Job Number: AK0296G325MR
ALASKA
MEASURED I N C L AZIMUTH VERTICAL
DEPTH DEPTH
feet deg. deg. feet
VERTICAL
SECTION
feet
Di r e c t i ona
1 Survey
SUBSEA DOGLEG CLOSURE
DEPTH SEVERITY DIST. AZIMUTH
feet deg./ feet deg.
100 ft.
Page
0.0 0.00 0:00 0.0 0.0 -56.0 0.00 0.0 0.0
HORIZONTAL
COORDINATES
feet
0.00 N 0.00
0 - 4435 FT. GYRO MULTISHOT SURVEY IN 10 3/4 IN. CASING
ALL MEASURED DEPTHS REFERENCED TO DOYON 15 R.K.B. ELEV.OF 56 FT.
100.0 .27 102.92 100.0 .2 44.0 .27 .2 102.9
200.0 .18 114.14 200.0 .6 144.0 .10 .6 105.7
250.0 .32 115.43 250.0 .8 194.0 .28 .9 108.1
280.0 .76 112.79 280.0 1.1 224.'0 1.47 1.1 109.4
310.0 1.51 106.68 310.0 1.7 254.0 2.52 1.7 109.2
340.0 1.79 105.59 340.0 2.6 284.0 .96 2.6 108.2
370.0 2.29 111.34 370.0 3.6 314.0 1.78 3.7 108.3
400.0 2.94 115.50 399.9 5.0 343.9 2.25 5.0 109.8
430.0 3.82 118.22 429.9 6.8 373.9 3.00 6.8 111.7
460.0 4.21 117.15 459.8 8.9 403.8 1.33 8.9' 113.1
490.0 4.43 118.66 489.7 11.1 433.7 .83 11.1 114'.1
520.0 4.74 118.54 519.6 13.5 463.6 1.01 13.5 114.9
550.0 5.23 116.80 549.5 16.1 493.5 1.71 16.1 115.3
580.0 5.53 118.73 579.4 18.9 523.4 1.18 18.9 115.7
610.0 5.79 120.02 609.2 21.9 553.2 .97 21.9 116.2
640.0 6.31 119.96 639.1 25.0 583.1 1.73 25.0 116.7
670.0 6.66 119.76 668.9 28.4 612.9 1.17 28.4 117.0
700.0 6.98 120.94 698.7 32.0 642.7 1.15 32.0 117.4
730.0 7.43 120.28 728.4 35.7 672.4 1.52 35.7 117.8
760.0 8.23 120.75 758.1 39.8 702.1 2.68 39.8 118.0
.05 S .23 E
.17 S .61 E
.26 S .81 E
.38 S 1.07 E
.57 S 1.63 E
.81 S 2.46 E
1.15 S 3.47 E
1.70 S 4.72 E
2.50 S 6.30 E
3.48 S 8.16 v
4.54 S 10.16 m
5.69 S 12.26 E
6.89 S 14.57 E
8.21 S 17.06 E
9.66 S 19.64 E
11.24 S 22.38 E
12.93 S 25.32 E
14.73 S 28.39 E
16.64 S 31.63 E
18.72 S 35.15 E
A Gyrodat a D i r e c t i ona i Survey
B.P. EXPLORATION
WELL: MPI UNIT, 1-59/0-24
Location: DOYON 15, ENDICOTT FIELD,
Job Number: AK0296G325MR
ALASKA
Page
MEASURED I N C L AZIMUTH VERTICAL
DEPTH DEPTH
feet deg. deg. feet
VERTICAL
.SECTION
feet
SUBSEA
DEPTH
feet
DOGLEG CLOSURE
SEVERITY DIST. AZIMUTH
deg. / feet deg.
100 ft.
HORIZONTAL
COORDINATES
feet
790.0 8.51 122.25 787.8
820.0 8.62 121.88 817.5
850.0 8.63 122.53 847.1
880.0 8.72 122.01 876.8
910.0 8.92 122.01 906.4
44.1
48.6
53.1
57.5
62.1
731.8
761.5
791.1
820.8
850.4
.19 44.2 118.4
.39 48.6 118.7
.33 .53.1 119.0
.38 57.7 119.3
.69 62.2 119.5
21.00 S 38.87
23.37 S 42.66 m
25.77 S 46.46 E
28.19 S 50.29 E
30.62 S 54.19 E
940.0 9.12 121.16 936.1
970.0 9.32 120.'05 965.7
1000.0 9.59 118.94 995.3
1030.0 9.83 119.01 1024.9
1060.0 10.19 118.69 1054.4
66.8
71.6
76.5
81.6
86.8
880.1
909.7
939.3
968.9
998.4
.79 66.9 119.6
.90 71.8 119.7
.07 76.7 119.7
.83 81.7 119.6
.20 87.0 119.6
33.09 S 58.20 E
35.53 S 62.33 E
37.96 S 66.62 E
40.41 S 71.05 E
42.93 S 75.62 E
1090.0 10.47 118.49 1083.9
1120.0 10.73 118.50 1113.4
1150.0 11.02 120.26 1142.9
1180.0 11.25 117.44 1172.3
1210.0 11.55 118.44 1201.7
92.1
97.7
103.3
109.1
115.0
1027.9
1057.4
1086.9
1116.3
1145.7
.95 92.3 119.5
.87 97.9 119.5
.45 103.5 119.5
.97 109.3 119.4
.21 115.2 119.4
45.50 S 80.34 E
48.14 S 85.19 E
50.91 S 90.13 E
53.71 S 95.20 E
56.49 S 100.44 ~
1240.0 11.97 119.31 1231.1
1270.0 12.41 119.32 1260.4
1300.0 13.32 116.11 1289.6
1330.0 14.24 117.30 1318.8
1360.0 14.93 117.22 1347.8
121.1
127.4
134.1
141.3
148.8
1175.1
1204.4
1233.6
.1262.8
1291.8
.51 121.3 119.3
.47 127.7 119.3
.86 134.4 119.2
.21 141.5 119.1
.29 149.0 119.0
59.44 S 105.79 E
62.54 S 111.31 E
65.64 S 117.23 E
68.86 S 123.61 E
72.32 S 130.33 E
1390.0 15.52 116.23 1376.8
1420.0 15.87 116.07 1405.6
1450.0 16.12 116.65 1434.5
1480.0 16.18 115.40 1463.3
1510.0 16.29 114.93 1492.1
156.7
164.8
173.1
181.4
189.8
1320.8
1349.6
1378.5
1407.3
1436.1
.16 156.9 118.9
.17 165.0 118.8
.99 173.3 118.7
.18 181.6 118.5
.57 190.0 118.4
75.86 S 137.37 E
79.44 S 144.65 E
83.11 S 152.06 E
86.77 S 159.56 E
90.33 S 167.15 E
A Gyroda t a D i r e c t i ona i
B.P. EXPLORATION
WELL: MPI UNIT, 1-59/O-24
Location: DOYON 15, ENDICOTT FIELD,
Job Number: AK0296G325MR
ALASKA
Survey
Page
MEASURED I N C L AZIMUTH VERTICAL
DEPTH DEPTH
feet deg. deg. feet
VERTICAL
SECTION
feet
SUBSEA DOGLEG CLOSURE
DEPTH SEVERITY DIST. AZIMUTH
feet deg./ feet deg.
100 ft.
HORIZONTAL
COORD. I NATES
feet
1540.0 '16.36 116.37 1520.9
1570.0 16.59 116.59 1549.7
1600.0 16.99 117.87 1578.4
1630.0 16.94 118.40 1607.1
1660.0 16.90 119.11 1635.8
198.2
206.7
215.4
224.2
232.9
1464.9
1493.7
1522.4
1551.1
1579.8
1.37 198.4 118.3
.80 206.9 118.2
1.82 215.6 118.2
.55 224.3 118.2
.70 233.1 118.2
93.98 S 174.75
97.78 S 182.37 m
101.74 S 190.07 E
105.87 S 197.79 E
110.07 S 205.45 E
1690.0 16.87 118.06 1664.5
1720.0 16.81 119.38 1693.2
1750.0 16.88 120.27 1721.9
1780.0 16.95 122.70 1750.6
1810.0 17.05 124.37 1779.3
241.6
250.3
258.9
267.6
276.3
1608.5 1.02 241.8 118.2 114.24 S 213.10 E
1637.2 1.29 250.5 118.2 118.42 S 220.72 E
1665.9 .90 259.2 118.3 122.74 S 228.26 E
1694.6 2.36 267.9 118.4 127.30 S 235.70 E
1723.3 1.67 276.6 118.5 132.14 S 243.01 E
1840.0 17.08 124.18 1808.0
1870.0 17.03 121.83 1836.7
1900.0 17.04 121.17 1865.3
1930.0 17.17 120.20 1894.0
1960.0 17.38 119.36 1922.7
285.0
293.7
302.5
311.3
320.2
1752.0 .22 285.4 118.7
1780.7 2.31 294.1 118.8
1809.3 .65 302.9 118.9
1838.0 1.05 311.7 119.0
1866.7 1.09 320.7 119.0
137.10 S 250.29 E
141.89 S 257.66 E
146.48 S 265.16 E
150.99 S 272.75 E
155.41 S 280.48 ~
1990.0 17.45 117.78 1951.3
2020.0 17.38 117.11 1979.9
2050.0 17.36 116.94 2008.5
2080.0 17.30 117.86 2037.2
2110.0 17.21 117.21 2065.8
329.1
338.1
347.1
356.0
364.9
1895.3
1923.9
1952.5
1981.2
2009.8
1.59 329.6 119.0
.72 338.6 118.9
.18 347.6 118.9
.93 356.5 118.9
.70 365.4 118.8
159.70 S 288.36 E
163.84 S 296.33 E
167.91 S 304.31 E
172.02 S 312.24 E
176.14 S 320.13 E
2140.0 17.18 118.27 2094.5
2170.0 17.25 118.22 2123.1
2200.0 17.23 118.82 2151.8
2230.0 17.14 119.04 2180.5
2260.0 17.03 120.25 2209.1
373.8
382.6
391.5
400.4
409.2
2038.5
2067.1
2095.8
2124.5
2153.1
1.05 374.3 118.8
.23 383.1 118.8
.60 392.0 118.8
.37 400.9 118.8
1.25 409.7 118.8
180.26 S 327.98 E
184.47 S 335.81 E
188.71 S 343.62 E
193.00 S 351.38 E
197.36 S 359.04 E
A Gyrodat a D i re c t i o na i Survey
B.P. EXPLORATION
WELL: MPI UNIT, 1-59/O-24
Location: DOYON 15, ENDICOTT FIELD,
Job Number: AK0296G325MR
ALASKA
page
MEASURED I N C L AZIMUTH VERTICAL
DEPTH DEPTH.
feet deg. deg. feet
VERTICAL
SECTION
feet
SUBSEA
DEPTH
feet
DOGLEG CLOSURE
SEVERITY DIST. AZIMUTH
deg. / feet deg.
100 ft.
HORIZONTAL
COORDINATES
feet
2290.0 16.91 119.57 2237.8
2320.0 16.70 119.95 2266.5
2350.0 16.54 120.06. 2295.3
2380.0 16.47 120.42 2324.1
2410.0 16.40 120.83 2352.8
417.9
426.5
435.1
443.6
452.1
2181.8
2210.5
2239.3
2268.1
2296.8
.77 418.5 118.8
.81 427.1 118.8
.53 ~435.7 118.9
.41 444.2 118.9
.47 452.7 118.9
201.73 S 366.63
206.03 S 374.16 m~
210.32 S 381.59 E
214.62 S 388.95 E
218.94 S 396.26 E
2440.0 16.28 120.93 2381.6
2470.0 16.17 122.39 2410.4
2500.0 16.31 120.90 2439.2
2530.0 16.94 121.57 2468.0
2560.0 17.69 121.47 2496.6
460.5
468.8
477.2
485.7
494.6
2325.6
2354.4
2383.2
2412.0
2440.6
.40 461.2 119.0
.41 469.5 119.0
.46 477.9 119.1
.19 486.5 11.9.1
.49 495.4 119.1
223.27 S 403.50 E
227.67 S 410.64 E
232.07 S 417.78 E
236.52 S 425.11 E
241.19 S 432.72 E
2590.0 18.29 121.13 2525.1
2620.0 18.75 120.96 2553.6
2650.0 19.76 117.68 2581.9
2680.0 20.26 118.11 2610.1
2710.0 21.02 116.47 2638.2
503.8
513.3
523.2
533.4
544.0
2469.1
2497.6
2525.9
2554.1
2582.2
.03 504.7 119.2
.56 514.2 119.2
.93 524.1 119.2
.74 534.3 119.2
.20 544.9 119.1
246.00 S 440.64 E
250.92 S 448.80 E
255.75 S 457.43 E
260.56 S 466.50 E
265.40 S 475.90 ~
2740.0 21.95 115.75 2666.1
2770.0 22.79 114.71 2693.8
2800.0 23.65 113.98 2721.4
2830.0 24.47 113.59 2748.8
2860.0 25.27 112.04 2776.0
555.0
566.4
578.2
590.4
603.0
2610.1
2637.8
2665.4
2692.8
2720.0
.22 555.9 119.1
.08 567.3 119.0
.02 579.1 118.9
.81 591.2 118.8
.43 603.8 118.7
270.24 S 485.77 E
275.10 S 496.10 E
279.98 S 506.87 E
284.91 S 518.06 E
289.80 S 529.69 E
2890.0 25.94 111.47 280'3.1
2920.0 27.08 111.84 2829.9
2950.0 27.95 110.65 2856.5
2980.0 28.38 110.06 2883.0
3010.0 28.95 109.46 2909.3
616.0
629.3
643.1
657.2
671.5
2747.1
2773.9
2800.5
2827.0
2853.3
· 39 616.7 118.5
.83 630.0 118.4
.43 643.7 118.2
.71 657.7 118.1
.10 672.0 117.9
294.60 S 541.74 E
299.55 S 554.18 E
304.57 S 567.10 E
309.49 S 580.38 E
314.36 S 593.92 E
A Gyroda t a D i r e c t i ona i Survey
B.P. EXPLORATION
WELL: MPI UNIT, 1-59/O-24
Location: DOYON 15, ENDICOTT FIELD,
Job Number: AK0296G325MR
ALASKA
Page
MEASURED I N C L AZIMUTH VERTICAL
DEPTH DEPTH
feet deg. deg. feet
3040.0 29.39 109.19 2935.5
3070 . 0 29 . 71 108 . 54 2961 . 6
3100 . 0 30 . 04 108 . 12 2987 . 6
3130 . 0 29 . 98 107 . 84 3013 . 6
3160.0 29.93 108.39 3039.6
VERTICAL
SECTION
feet
686.1
700.8
715.6
730.4
745.3
SUBSEA
DEPTH
feet
DOGLEG CLOSURE
SEVERITY DIST. AZIMUTH
deg./ feet deg.
100 ft.
2879.5 1.55 686.4 117.7
2905.6 1.50 701.1 117.5
2931.6 1.29 715.8 117.3
2957.6 .50 730.6 117.1
2983.6 .92 745.4 117.0
HORIZONTAL
C 00.R D I N A T E S
feet
319.19 S 607.72
323.98 S 621.72 A
328.68 S 635.91 E
333.31 S 650.18 E
337.97 S 664.41 E
3190.0 29.77 108.06 3065.6
3220.0 29.39 108.35 3091.7
3250.0 29.20 108.97 3117.8
3280.0 28.72 109.46 3144.1
3310.0 28.44 109.66 3170.4
760.1
774.8
789.3
803.8
818.0
3009.6
3035.7
3061.8
3088.1
3114.4
.75 760.2 116,8
1.35 774.8 116.6
1.19 789.4 116.5
1.79 803.8 116.3
.98 818.0 116.2
342.64 S 678.60 E
347.26 S 692.66 E
351.96 S 706.57 E
356.74 S 720.29 E
361.55 S 733.81 E
3340.0 28.36 110.83 3196.8
3370.0 28.11 109.77 3223.3
3400.0 28.30 109.07 3249.7
3430.0 28.38 109.77 3276.1
3460.0 28.00 110.11 3302.5
832.2
846.4
860.4
874.6
888.7
3140.8 1.88 832.2 116.1
3167.3 1.88 846.4 116.0
3193.7 1.27 860.4 115.9
3220.1 1.15 874.6 115.8
3246.5 1.37 888.7 115.7
366.48 S 747.20 E
371.41 S 760.51 E
376.12 S 773.88 E
380.86 S 787.31 E
385.69 S 800.63 ~
3490.0 27.78 109.70 3329.1
3520.0 27.75 109.99 3355.6
3550.0 27.33 109.92 3382.2
3580.0 27.19 110.00 3408.9
3610.0 27.36 110.15 3435.5
902.6
916.5
930.3
944.0
957.7
3273.1
3299.6
3326.2
3352.9
3379.5
.98 902.6 115.6
.46 916.6 115.5
1.43 930.4 115.5
.46 944.0 115.4
.59 957.7 115.3
390.47 S 813.83 E
395.21 S 826.97 E
399.94 S 840.01 E
404.64 S 852.92 E
409.35 S 865.84 E
3640.0 27.50
3670.0 27.95
3700.0 28.28
3730.0 28.56
3760.0 28.88
109.14
109.76
109.36
108.95
lO8~12
3462.2
3488.7
3515.2
3541.6
971.4
985.3
999.4
1013.5
1027.8
3406.2
3432.7
3459.2
3485.6
3511.9
1.62 971.5 115.2
1.77 985.4 115.1
1.29 999.4 115.1
1.12 1013.6 115.0
1.71 1028.0 114.9
414.00 S 878.85 E
418.65 S 892.01 E
423.38 S 905.33 E
428.07 S 918.82 E
432.65 S 932.49 E
A Gyroda t a D i re c t i ona i Survey
B.P. EXPLORATION
WELL: MPI UNIT, 1-59/0-24
Location: DOYON 15, ENDICOTT FIELD,
Job Number: AK0296G325MR
ALASKA
Page
MEASURED I N C L AZIMUTH VERTICAL VERTICAL SUBSEA
DEPTH DEPTH SECTION DEPTH
feet deg. deg. feet feet feet
DOGLEG CLOSURE
SEVERITY DIST. AZIMUTH
deg. / feet deg.
100 ft.
HORIZONTAL
COORDINATES
feet
3790.0 29.35 107.90 3594.1 1042.3 3538.1
3820.0 29.54 107.57 3620.2 1056.9 3564.2
3850.0 29.39 107,63 3646.3 1071.5 3590.3
3880.0 29.48 107.79 3672.5 1086.1 3616.5
3910.0 29.45 108.07 3698.6 1100.7 3642.6
1.~60 1042.5 114.8
.85 1057.1 114.7
.51 1071.7 114.6
.39 1086.4 114.5
.46 1101.0 114.4
437.16 S 946.37
441.66 S 960.42 E'
446.12 S 974.49 E
450.60 S 988.53 E
455.15 S 1002.57 E
3940.0 29.28 107.76 3724.7 1115.3 3668.7
3970.0 29.20 108.52 3750.9 1129.8 3694.9
4000.0 29.09 108.46 3777.1 1144.3 3721.1
4030.0 29.15 109.53 3803.3 1158.8 3747.3
4060.0 28.95 110.25 3829.5 1173.3 3773.5
.75 1115.7 114.3
1.27 1130.2 114.3
.39 1144.8 114.2
1.75 1159.3 114.1
1.33 1173.8 114.1
459.67 S 1016.57 E
464.23 S 1030.50 E
468.87 S 1044.35 E
473.62 S 1058.16 E
478.58 S 1071.85 E
4090.0 29.06 110.10 3855.8 1187.8 3799.8
4120.0 29.12 110.44 3882.0 1202.3 3826.0
4150.0 29.11 111.52 3908.2 1216.8 3852.2
4180.0 28.99 111.90 3934.4 1231.3 3878.4
4210.0 28.88 112.20 3960.7 1245.8 3904.7
.44 1188.4 114.0
.58 1202.9 114.0
1.75 1217.5 113.9
.73 1232.0 113.9
.60 1246.5 113.9
483.59 S 1085.51 E
488.64 S 1099.19 E
493.87 S 1112.82 E
499.26 S 1126.35 E
504.70 S 1139.80 ~
4240.0 28.72 112.59 3987.0 1260.3 3931.0
4270.0 28.74 112.72 4013.3 1274.7 3957.3
4300.0 28.73 113.08 4039.6 1289.1 3983.6
4330.0 28.75 113.00 4065.9 1303.5 4009.9
4360.0 28.87 111.08 4092.2 1317.9 4036.2
.82 1261.0 113.9
.21 1275.4 113.9
.57 1289.8 113.8
.15 1304.3 113.8
3.11 1318.7 113.8
510.21 S
515.77 S
521.38 S
527.02 S
532.45 S
1153.16 E
1166.47 E
1179.76 E
1193.03 E
1206.43 E
4390.0 28.80 111.02 4118.5 1332.3 4062.5
4420.0 28.86 110.77 4144.7 1346.7 4088.7
.23 1333.2 113.8
.45 1347.6 113.8
537.64 S
542.80 S
1219.93 E
1233.45 E
4435 - 9715 FT. GYRO MULTISHOT SURVEY IN 5 IN. DRILLPIPE
ALL MEASURED DEPTHS REFERENCED TO DOYON 15 R.K.B. ELEV. OF 56 FT.
A Gyrodat a D i r e c t i ona i Survey
B.P. EXPLORATION
WELL: MPI UNIT, 1-59/0-24
Location: DOYON 15, ENDICOTT FIELD,
Job Number: AK0296G325MR
ALASKA
Page
MEASURED I N C L AZIMUTH VERTICAL
DEPTH . DEPTH
feet deg. deg. feet
VERTICAL SUBSEA
SECTION .DEPTH
feet feet
DOGLEG CLOSURE
SEVERITY DIST. AZIMUTH
deg. / feet deg.
100 ft.
HORIZONTAL
COORDINATES
feet
TIE-IN DATA SUPPLIED BY GYRODATA SURVEY (AK0296G323)
4435.0 28.92 111.03 4157.9 1353.9 4101.9
4515.0 28.55 112.38 4228.0 1392.3 4172.0
4615.0 28.49 113.21 4315.9 1440.0 4259.9
.92 1354.8 113.7
.93 1393.3 113.7
.40' 1441.0 113.7
545.39 S 1240.22 E
559.61 S 1275.95 E
578.11 S 1319.97 E
4715.0 28.51 113.11 4403.8 1487.6 4347.8
4815.0 28.29 112.40 4491.7 1535.1 4435.7
4915.0 28.95 112.85 4579.5 1583.0 4523.5
5015.0 29.40 110.68 4666.8 1631.6 4610.8
5115.0 29.24 110.83 4754.0 1680.3 4698.0
.05 1488.7 113.6
.40 1536.3 113.6
.69 1584.2 113.6
1.15 1632.9 113.5
.17 1681.8 113.4
596.87 S
615.27 S
633.70 S
651.77 S
669.12 S
1363.84 E
1407.70 E
1451.91 E
1497.18 E
1542.97 E
5215.0 29.17 109.84 4841.3 1728.9 4785.3
5315.0 28.84 111.42 4928.8 1777.2 4872.8
5415.0 29.44 110.66 5016.1 1825.7 4960.1
5515.0 28.99 110.16 5103.4 1874.3 5047.4
5615.0 28.20 111.95 5191.2 1922.0 5135.2
5715.0 28.80 111.64 5279.1 1969.6 5223.1
5815.0 27.47 112.64 5367.2 2016.7 5311.2
5915.0 28.00 113.04 5455.8 2063.1 5399.8
6015.0 28.42 113.11 5543.9 2110.4 5487.9
6115.0 27.95 114.29 5632.0 2157.5 5576.0
.49 1730.5 113.4
.83 1779.0 113.3
.71 1827.6 113.2
.51 1876.4 113.1
1.17 1924.2 113.1
.62 1971.9 113.1
1.41 2019.1 113.0
.56 2065.6 113.0
.43 2112.9 113.0
.73 2160.1 113.1
686.08 S
703.16 S
720.64 S
737.66 S
754.85 S
772.56 S
790.32 S
808.38 S
826.91 S
845.89 S
1588.72 E
1634.10 E
1679.55 E
1725.29 E
1769.96 ~
1814.27 E
1857.95 E
1900.83 E
1944.32 E
1987.57 E
6215.0 28.19 113.98 5720.3 2204.6 5664.3
6315.0 28.66 117.36 5808.2 2252.2 5752.2
6415.0 29.55 120.84 5895.6 2300.7 5839.6
6515.0 30.30 123.31 5982.3 2350.3 5926.3
6615.0 30.85 123.06 6068.4 2400.7 6012.4
.28 2207.1 113.1
1.67 2254.7 113.1
1.91 2303.0 113.3
1.44 2352.3 113.4
.57 2402.5 113.6
865.13 S
885.75 S
909.41 S
935.90 S
963.74 S
2030.51 E
2073.39 E
2115.87 E
2158.12 E
2200.70 E
A Gyroda t a D i r e c t i ona i Survey
B.P. EXPLORATION
WELL: MPI UNIT, 1-59/O-24
Location: DOYON 15, ENDICOTT FIELD,
Job Number: AK0296G325MR
ALASKA
Page
MEASURED I N C L AZIMUTH VERTICAL
DEPTH DEPTH
feet deg. deg. feet
VERTICAL
SECTION
feet
SUBSEA
DEPTH
feet
DOGLEG CLOSURE
SEVERITY.DIST. AZIMUTH
deg./ feet deg.
100 ft.
HORIZONTAL
COORDINATES
feet
6715.0 31.25 121.69 6154.0
6815.0 30.68 122.19 6239.8
6915.0 30.46 121.34 6325.9
7015.0 31.12 122.81 6411.8
7115.0 31.41 122.56 6497.3
2452.0
2503.1
2553.7
2604.6
2656.1
'6098.0
6183.8
6269.9
6355.8
6441.3
.81 2453.5 113.8
.62 2504.4 114.0
.48 2554.8 114.2
.99 2605.5 114.3
.32 2656.9 114.5
991.35 S 2244.26 )
1018.56 S 2287.92 b ~'
1045.34 S 2331.16 E
1072.52 S 2374.53 E
1100.55 S 2418.21 E
7215.0 31.40 124.04 6582.6
7315.0 30.62 122.49 6668.3
7415.0 31.34 122.73 6754.1
7515.0 30.24 123.78 6840.0
7615.0 29.97 123.41 6926.5
2707.8
2758.9
2810.0
2860.7
2910.4
6526.6
6612.3
6698.1
6784.0
6870.5
.77 2708.4 114.6
.11 2759.3 114.8
.73 2810.3 114.9
.22 2861.0 115.1
.33 2910.6 115.2
1129.15 S
1157.42 S
1185.16 S
1213.22 S
1240.98 S
2461.76 E
2504.83 E
2548.19 E
2591.00 E
2632.78 E
7715.0 30.24 123.63 7013.0
7815.0 30.15 123.89 7099.4
7915.0 29.84 125.02 7186.0
8015.0 29.99 124.77 7272.7
8115.0 30.07 124.14 7359.3
2960.1
3010.0
3059.4
3108.6
3158.1
6957.0
7043.4
7130.0
7216.7
7303.3
.30 2960.2 115.4
.16 3010.0 115.5
.65 3059.4 115.7
.19 3108.6 115.8
.32 3158.1 115.9
1268.68 S
1296.63 S
1324.91 S
1353.44 S
1381.75 S
2674.59 E
2716.41 E
2757.63 E
2798.54 E
2839.80 ~
8215.0 30.25 124.03 7445.7
8315.0 30.41 124.24 7532.1
8415.0 30.61 124.25 7618.2
8515.0 30.48 124.91 7704.3
8615.0 30.11 124.00 7790.7
3207.8
3257.8
3308.0
3358.3
3408.1
7389.7
7476.1
7562.2
7648.3
7734.7
.19 3207.9 116.1
.20 3257.9 116.2
.20 3308.1 116.3
.36 3358.5 116.4
.59 3408.4 116.6
1409.91 S
1438.25 S
1466.82 S
1495.66 S
1524.20 S
2881.41 E
2923.21 E
2965.18 E
3007.02 E
3048.61 E
8715.0 30.08 123.59 7877.2
8815.0 30.09 124.12 7963.7
8915.0 30.02 124.09 8050.3
9015.0 30.14 124.27 8136.8
9115.0 30.31 122.61 8223.2
3457.8
3507.4
3557.0
3606.6
3656.5
7821.2
7907.7
7994.3
8080.8
8167.2
.21 3458.2 116.7
.27 3507.9 116.8
.07 3557.6 116.9
.15 3607.3 117.0
.85 3657.3 117.1
1552.08 S
1580.01 S
1608.10 S
1636.25 S
1663.99 S
3090.28 E
3131.91 E
3173.39 E
3214.85 E
3256.86 E
A Gy r o d a t a
Di re c t i ona
1 Survey
B. P. EXPLORATION
WELL: MPI UNIT, 1-59/O-24
Location: DOYON 15, ENDICOTT FIELD,
Job Number: AK0296G325MR
ALASKA
Page
MEASURED I N C L AZIMUTH VERTICAL
DEPTH DEPTH
feet deg. deg. feet
VERTICAL
SECTION
feet
SUBSEA DOGLEG CLOSURE
DEPTH SEVERITY DIST. AZIMUTH
feet deg./ feet deg.
100 ft.
HORIZONTAL
COORDINATES
feet
9215.0 30.75 122.14 8309.3 3706.9 8253.3 .50 3707.9 117.t
9315.0 30.81 119.91 8395.3 3757.9 8339.3 1.15 3759.0 117.2
9415.0 30.97 120.29 8481.1 3809.1 8425.1 .25 3810.2 117.2
9515.0 30.75 120.31 8566.9 3860.2 8510.9 .22 3861.5 117.3
9615.0 30.37 121.48 8653.0 3910.9 8597.0 .71 3912.2 117.3
1691.19 S 3299.77
1717.57 S 3343.62 m ~
1743.31 S 3388.03 E
1769.19 S 3432.32 E
1795.29 S 3475.95 E
9715.0 31.16 119.56 8739.0 3961.9 8683.0 1.26 3963.3 117.4
1821.26 S 3520.02 E
Final Station Closure: Distance: 3963.27 ft Az: 117.36 deg.
A Gyrodat a D i re c t i o n a i Survey
for
B.P. EXPLORATION
WELL: MPI UNIT, 1-59/O-24
Location: DOYON 15, ENDICOTT FIELD, ALASKA
Job Number: AK0296G325SS
Run Date: 12-Feb-96 06:44:21
Surveyor: TOM STODDARD
Calculation Method: MINIMUM CURVATURE
Survey Latitude: 70.~53000 deg. N
Sub-sea Correction from Vertical Reference: 56 ft.
Azimuth Correction:
Gyro: Bearings are Relative to True North
Proposed Well Direction: 115.830 deg
Vertical Section Calculated from Well Head Location
Closure Calculated from Well Head Location
Horizontal Coordinates Calculated from Local Horizontal Reference
A Gyrodat a D i r e c t i on a i
B.P. EXPLORATION
WELL: MPI UNIT, 1-59/0-24
Location: DOYON 15, ENDICOTT FIELD,
Job Number: AK0296G325SS
ALASKA
SUBSEA I N C L AZIMUTH VERTICAL VERTICAL DOGLEG
DEPTH. DEPTH SECTION SEVERITY
feet deg. deg. feet feet deg./
100 ft.
Survey
-56.0 0.00 0.00 0.0 0.0 0.00
CLOSURE
DIST. AZIMUTH
feet deg.
0 - 4435 FT. GYRO MULTISHOT SURVEY IN 10 3/4 IN. CASING
ALL MEASURED DEPTHS REFERENCED TO DOYON 15 R.K.B. ELEV.OF 56 FT.
0.0 0.0
Page
HORIZONTAL
COORDINATES
feet
0.00 N 0.00 E
100.0 .22 109.21 156.0 .5 .18
200.0 .41 114.90 256.0 .9 .52
300.0 2.06 108.66 356.0 3.1 1.40
400.0 4.16 117.29 456.0 8.6 1..55
500.0 5.29 117.22 556.0 16.7 1.59
600.0 6.51 119.85 656.0 27.0 1.42
700.0 8.17 120.71 756.0 39.5 2.60
800.0 8.66 122.38 856.0 54.4 .34
900.0 9.26 120.41 956.0 70.0 .87
1000.0 10.21 118.68 1056.0 87.1 1.19
1100.0 11.12 119.00 1156.0 105.9 1.68
1200.0 12.35 119.32 1256.0 126.5 1.48
1300.0 15.10 116.94 1356.0 151.0 2.25
1400.0 16.17 115.72 1456.0 179.3 1.13
1500.0 16.68 116.88 1556.0 208.7 1.02
1600.0 16.88 118.37 1656.0 239.0 .93
1700.0 16.97 123.01 1756.0 269.2 2.23
1800.0 17.04 121.38 1856.0 299.6 1.19
1900.0 17.44 117.67 1956.0 330.6 1.45
2000.0 17.24 117.43 2056.0 361.8 .78
.6
1.1
3.7
8.9
18.9
28.4
39.8
57.7
71.8
92.3
109.3
127.7
156.9
181.6
215.6
241.8
276.6
302.9
338.6
365.4
104.5 .12 S .45 E
108.3 .29 S .86 E
108.3 .99 S 3.00 E
112.9 3.35 S 7.92 E
115.4 7.18 S 15.11 E
116.9 12.20 S 24.05 E
118.0 18.57 S 34.90 E
119.1 26.49 S 47.61 E
119.7 34.73 S 60.98 E
119.6 43.07 S 75.88 E
119.4 52.16 S 92.39 E
119.3 62.08 S 110.49 E
119.0 73.32 S 132.32 E
118.6 85.84 S 157.66 E
118.2 98.65 S 184.07 E
118.2 113.01 S 210.84 E
118.4 128.21 S 237.07 E
118.9 144.99 S 262.72 E
119.0 160.39 S 289.67 E
118.8 174.73 S 317.42 E
A Gyroda t a D i r e c t i ona i
B.P. EXPLORATION
WELL: MPI UNIT, 1-59/0-24
Location: DOYON 15, ENDICOTT FIELD,
Job Number: AK0296G325SS
ALASKA
Survey
SUBSEA I N C L AZIMUTH VERTICAL VERTICAL DOGLEG CLOSURE
DEPTH DEPTH SECTION SEVERITY DIST. AZIMUTH
feet deg. deg. feet feet deg./ feet deg.
100 ft.
2100~0 17.22 118.85 2156.0 392.8 .56 400.9 118.8
2200.0 16.78 119.81 2256.0 423.4 .80 427.1 118.8
2300.0 16.38 120.84 2356.0 453.0 .46 461.2 118.9
2400.0 16.68 121.29 2456.0 482.1 1.89 486.5 119.1
2500.0 18.83 120.68 2556.0 514.1 1.84 524.1 119.2
2600.0 21.62 116.01 2656.0 551.0 3.21 555.9 119.1
2700.0 24.68 113.18 2756.0 593.8 2.97 603.8 118.8
2800.0 27.94 110.67 2856.0 642.9 3.44 643.7 118.2
2900,0 29.64 108.68 2956.0 697.6 1.51 701.1 117.6
3000.0 29.83 108.18 3056.0 754.6 .82 760.2 116.9
3100.0 28.60 109.55 3156.0 810.2 1.43 818.0 116.3
3200.0 28.32 109.24 3256.0 863.8 1.24 874.6 115.9
3300.0 27.75 109.99 3356.0 916.7 .47 930.4 115.5
3400.0 27.47 109.37 3456.0 968.2 1.39 971.5 115.2
3500.0 28.74 108.50 3556.0 1021.4 1.44 1028.0 114.9
3600.0 29.42 107.69 3656.0 1076.9 .46 1086.4 114.6
3700.0 29.18 108.51 3756.0 1132.6 1.10 1144.8 114.2
3800.0 29.06 110.10 3856.0 1187.9 .44 1202.9 114.0
3900.0 28.90 112.15 3956.0 1243.2 .62 1246.5 113.9
4000.0 28.74 113.03 4056.0 1298.1 .31 1304.3 113.8
Page
HORIZONTAL
COORDINATES
feet
189.34 S 344.76 E
204.45 S 371.39 E
219.42 S 397.05 E
234.67 S 422.06 E
251.33 S 449.54 E
268.49 S 482.20 E
286.20 S 521.14 E
304.47 S 566.85 E
322.95 S 618.73 E
340.91 S 673.37 E
358.91 S 726.40 E
377.25 S 777.09 E
395.28 S 827.16 E
412.92 S 875.84 E
430.58 S 926.32 E
447.78 S 979.69 E
465.14 S 1033.20 E
483.64 S 1085.63 E
503.73 S 1137.40 E
524.90 S 1188.05 E
4435 - 9715 FT. GYRO MULTISHOT SURVEY IN 5 IN. DRILLPIPE
ALL MEASURED DEPTHS REFERENCED TO DOYON 15 R.K.B. ELEV. OF 56 FT.
4100.0 28.91 110.99 4156.0 1352.9 .85 1354.8
TIE-IN DATA SUPPLIED BY GYRODATA SURVEY (AK0296G323)
113.7
545.02 S 1239.26 E
A Gyroda t a D i re c t i ona i Survey
B.P. EXPLORATION
WELL: MPI UNIT, 1-59/O-24
Location: DOYON 15, ENDICOTT FIELD,
Job Number: AK0296G325SS
ALASKA
Page
SUBSEA I N C L AZIMUTH VERTICAL VERTICAL DOGLEG
DEPTH DEPTH SECTION SEVERITY
feet deg. deg. feet feet deg./
100 ft.
CLOSURE
DIST. AZIMUTH
feet deg.
HORIZONTAL
COORDINATES
feet
4200.0 28.53 112.64 4256.0
4300.0 28.50 113.16 4356.0
4400.0 28.38 112.69 4456.0
4500.0 28.77 112.73 4556.0
1407.5
1461.7
1515.8
1570.2
.76
.24
.26
.62
1441.0 113.7
1488.7 113.6
1536.3 113.6
1584.2 113.6
565.50 S 1289.97 E
586.68 S 1340.00 E
607.80 S 1389.89 E
628.77 S 1440.07 E
4600.0 29.34 110.95 4656.0
4700.0 29.24 110.81 4756.0
4800.0 29.12 110.11 4856.0
4900.0 29.03 111.18 4956~0
5000.0 29.24 110.43 5056.0
1625.5
1681.5
1737.0
1792.3
1847.9
1.09
.18
.54
.80
.62
1632.9 113.5
1730.5 113.4
1779.0 113.3
1827.6 113.3
1876.4 113.2
649.53 S 1491.57 E
669.50 S 1544.01 E
688.95 S 1596.35 E
708.61 S 1648.27 E
728.42 S 1700.46 E
5100.0 28.52 111.23 5156.0
5200.0 28.64 111.72 5256.0
5300.0 27.64 112.51 5356.0
5400.0 28.00 113.04 5456.0
5500.0 28.36 113.27 5556.0
1902.9
1957.1
2010.7
2063.3
2116.8
.9O
.76
1.31
.56
.47
1924.2 113.1
1971.9 113.1
2019.1 113.0
2112.9 113.0
2160.1 113.0
747.96 S 1752.06 E
767.91 S 1802.64 E
788.06 S 1852.38 E
808.43 S 1900.95 E
829.52 S 1950.27 E
5600.0 28.01 114.20 5656.0
5700.0 28.38 115.35 5756.0
5800.0 29.15 119.26 5856.0
5900.0 30.07 122.56 5956.0
6000.0 30.77 123.09 6056.0
2170.3
2223.9
2278.7
2335.3
2393.5
.61
.85
1.80
1.59
.69
2207.1 113.1
2254.7 113.1
2303.0 113.2
2352.3 113.4
2402.5 113.6
851.12 S 1999.24 E
873.50 S 2047.94 E
898.69 S 2096.62 E
927.87 S 2145.32 E
959.74 S 2194.59 E
6100.0 31.24 121.70 6156.0
6200.0 30.64 122.03 6256.0
6300.0 30.69 121.86 6356.0
6400.0 31.27 122.68 6456.0
6500.0 31.40 123.58 6556.0
2453.1
2512.7
2571.6
2631.2
2691.7
.81
.60
.66
.65
.63
2504.4 113.8
2554.8 114.0
2605.5 114.2
2656.9 114.4
2708.4 114.6
991.97 S 2245.26 E
1023.61 S 2296.07 E
1054.87 S 2346.37 E
1087.02 S 2397.12 E
1120.23 S 2448.18 E
A Gyroda t a D i r e c t i ona i Survey
B.P. EXPLORATION
WELL: MPI UNIT, 1-59/O-24
Location: DOYON 15, ENDICOTT FIELD,
Job Number: AK0296G325SS
ALASKA
Page
SUBSEA I N C L AZIMUTH VERTICAL VERTICAL DOGLEG CLOSURE
DEPTH DEPTH SECTION SEVERITY. DIST. AZIMUTH
feet deg. deg. feet feet deg./ feet deg.
100 ft.
HORIZONTAL
C O O R D I N A T.E S
feet
6600.0 30.74 122.71 6656.0
6700.0 31.31 122.75 6756.0
6800.0 30.19 123.71 6856.0
6900.0 30.06 123.49 6956.0
7000.0 30.20 123.76 7056.0
2751.5
2811.1
2869.9
2927.4
2984.9
1.06 2759.3 114.8
.74 2861.0 114.9
1.06 2910.6 115.1
.32 2960.2 115.3
.23 3010.0 115.4
1153.35 'S 2498.63 E
1185.79 S 2549.16 E
1218.37 S 2598.74 E
1250.43 S 2647.05 E
1282.59 S 2695.40 E
7100.0 29.95 124.63 7156.0
7200.0 29.96 124.82 7256.0
7300.0 30.07 124.16 7356.0
7400.0 30.27 124.06 7456.0
7500.0 30.47 124.25 7556.0
3042.3
3099.1
3156.2
3213.8
3271.8
.48 3059.4 115.6
.28 3108.6 115.8
.32 3158.1 115.9
.19 3257.9 116.1
.20 3308.1 116.2
1315.11 S 2743.34 E
1347.95 S 2790.66 E
1380.68 S 2838.24 E
1413.28 S .2886.38 E
1446.19 S 2934.87 E
7600.0 30.55 124.54 7656.0
7700.0 30.26 124.36 7756.0
7800.0 30.09 123.69 7856.0
7900.0 30.09 124.07 7956.0
8000.0 30.03 124.10 8056.0
8100.0 30.18 123.90 8156.0
8200.0 30.48 122.43 8256.0
8300.0 30.79 120.93 8356.0
8400.0 30.92 120.18 8456.0
8500.0 30.78 120.30 8556.0
3330.1
3388.1
3445.6
3503.0
3560.3
3617.7
3675.7
3734.6
3794.1
3853.7
.27 3358.5 116.4
· 50 3408.4 116.5
· 30 3458.2 116.6
.26 3507.9 116.8
· 08 3607.3 116.9
.31 3657.3 117.0
· 72 3707.9 117.1
.85 3759.0 117.2
· 51 3810.2 117.2
.22 3861.5 117.3
1479.48 S
1512.74 S
1545.25 S
1577.52 S
1609.96 S
1642.41 S
1674.35 S
1705.51 S
1735.79 S
1765.90 S
2983.54 E
3031.91 E
3080.07 E
3128.20 E
3176.13 E
3224.18 E
3273.19 E
3323.58 E
3375.06 E
3426.69 E
8600.0 30.40 121.42 8656.0
8683.0 31.16 119.56 8739.0
3912.7
3961.9
.73 3963.3 117.3
1.26 3963.3 117.4
1796.19 S
1821.26 S
3477.48 E
3520.02 E
Final Station Closure: ....... ...Distance:
3963.27
ft
Az: 117.36 deg.
gyro/data
4. QUALITY CONTROL
SR325.DOC
Quality Control Comparisons
B.P. EXPLORATION
WELL: 1-59/O-24,. 5"DP
Location: MPI UNIT, ENDICOTT FIELD,
ALASKA
Job Number : AK0296G325
/ AK0296G325
INRUN/OUTRUN Comparison
INRUN OUTRUN INRUN
Depth Inc Inc Delta Az
6015.0 28.84 28.42 .413 113.48
7015.0 31.00 31.12 -.118 122.20
8015.0 30.25 29.99 .264 124.55
9015.0 30.11 30.14 -.036 123.98
For Inclinations Greater than 10 degrees:
Average Inclination Difference = .13095 deg.
Average Azimuth Difference = -.1802 deg.
OUTRUN
Az
113.11
122.81
124.77
124.27
Delta
.378
-.602
-.214
-.283
gyro/data
QUALITY CONTROL REPORT
JOB NUMBER: AK0296G325
TOOL NUMBER:
080
MAXIMUM GYRO TEMPERATURE:
MAXIMUM AMBIENT TEMPERATURE ·
78.70C
58.1C
MAXIMUM INCLINATION:
29.54
AVERAGE AZIMUTH:
WIRELINE REZERO VALUE:
117.36
15
REZERO ERROR / K:
.06 FT.
CALIBRATION USED FOR FIELD SURVEY:
1248
CALIBRATION USED FOR FINAL SURVEY:
1402
PRE JOB MASS BALANCE OFFSET CHECK ·
.28
POST JOB MASS BALANCE OFFSET CHECK~ :
CONDITION OF SHOCK WATCHES
.58
USED 0.0
UPON ARRIVAL AT RIG:
OK
UPON COMPLETION OF SURVEY:
PINK
UPON RETURN TO ATLAS
PINK
BOTTOM LINE COMPARISIONS
M.D. INC AZIMUTH TVD NORTHING EASTING
FIELD SURVEY 9715 31.17 119.26 8738.5 1779.5S 3542.8E
FINAL SURVEY 9715 31.16 119.56 8739.0 1821.26S 3520.02E
SR325.DOC
gyro/data
FUNCTION TEST
JOB NUMBER: AK0296G325
5 Survey stations were collected at the measured depth shown below. The tables show the repeatability
of the gyro tool in both inclination and azimuth at one measured depth.
INCLINATION
M.D. ft 1 2 3 4 5
9700 31.15 31.15 31.15 31.15 31.16
AZIMUTH
M.D. ff 1 2 3 4 5
9700 121.05 119.39 119.53 119.4 119.56
SR325.DOC
gyro/data
5. EQUIPMENT AND CHRONOLOGICAL REPORT
SR325.DOC
gyro/data
EQUIPMENT REPORT
JOB NUMBER: AK0296G325
DOWNHOLE ELECTRONICS
SURFACE ELECTRONICS
PRIMARY
TOOL No. 080
GYRO SECTION A0099
DATA SECTION C0031
POWER SECTION C0006
BACKUP
TOOL No. 713
GYRO SECTION A0088
DATA SECTION C0023
POWER SECTION C0022
COMPUTER
POWER SUPPLY
PRINTER
INTERFACE
COMPUTER
POWER SUPPLY
PRINTER
INTERFACE
A0213
A0085
A0029
A0035
A0215
A0055
A0079
A0071
WIRELINE COMPANY:
CABLE SIZE:
ATLAS WIRELINE
5/16"
RUNNING GEAR
2 1/2" SYSTEM
TOTAL LENGTH OF TOOL:
MAXIMUM O.d.:
17.5 feet
2.5 INCHES
TOTAL WEIGHT OF TOOL:
240Lbs
SR325.DOC
gyro/data
CHRONOLOGICAL REPORT
J,OB NUMBER' AK0296G325
2/12/96
19:00
20:40
2/13/96
02:30
03:00
04:00
ARRIVED AT LOCATION
PICK UP TOOL
LAY DOWN TOOL
PROCESS SURVEY
RETURN TO ATLAS
SR325.DOC
gyro/data
B.P. EXPLORATION
MPI UNIT, 1-59/O-24
ENDICOTT FIELD, ALASKA
Gyro Multishot Survey Of Drill Pipe
Survey date: 07 February 1996
Job number' AK0296G323
SR323.DOC
Gyrodata Incorporated
P.O, Box 79389
Houston, Texas 77279
713/461-3146
Fax: 713/461 °0920
February 26, 1996
B.P. Exploration (Alaska) Inc.
Petrotechnical Data Center, MB 3-3
900 E. Benson Blvd.
Anchorage, AK 99519-6612
Re:
MPI UNIT, WELL 1-59/O-24, ENDICOTT FIELD, ALASKA
Enclosed please find one (1) original eight (8) copies and (1) disk of the completed survey of
We11#1-59/O-24
We would like to take this opportunity to thank you for using Gyrodata and we look forward
to serving you in the future.
Sincerely
Robert J. Sl~oup
Operations Manager
RS/fec
Serving the Worldwide Energy Industry with Precision Survey Instrumentation
gyro/data
CONTENTS
JOB NUMBER :AK0296G323
1. DISCUSSION , SURVEY CERTIFICATION SHEET
2. SURVEY DETAILS
3. OUTRUN SURVEY LISTING
4. QUALITY CONTROL
5. EQUIPMENT AND CHRONOLOGICAL REPORT
SR323.DOC
1. DISCUSSION , SURVEY CERTIFICATION SHEET
SR323.DOC
gyro/data
DISCUSSION
JOB NUMBER' AK0296G323
Tool 080 was run in MPI Unit, 1-59/O-24 on ATLAS 5/16" Wireline inside drillpipe. The survey was
run without problems. ·
SR323.DOC
gyro/data
SURVEY CERTIFICATION SHEET
JOB NUMBER: AK0296G323
The data for this survey and the calculations for this survey were obtained and performed by me
according to standards and procedures as set forth by Gyrodata Limited, true and correct to the best of
my knowledge.
TOM STODDARD
OPERATIONS ENGINEER
The data and calculations for this survey have been checked by me and conform to the standards and
procedures as set forth by Gyrodata Limited.
This report represents a directional survey of this well based on the original data obtained at the wellsite.
Checked by :-
ROB SHOUP
OPERATIONS MANAGER
SR323.DOC
gyro/data
2. SURVEY DETAILS
SR323.DOC
gyro/data
SURVEY DETAILS
JOB NUMBER: AK0296G323
CLIENT:
B.P. EXPLORATION
RIG:
DOYON 15
LOCATION:
ENDICOTT FIELD
WELL:
1-59/O-24
LATITUDE:
70.505000 N
LONGITUDE:
SURVEY DATE:
07 February 1996
SURVEY TYPE :
MULTISHOT IN 5" Drillpipe
DEPTH REFERENCE:
MAX. SURVEY DEPTH:
ROTARY TABLE ELEVATION
56
4435
SURVEY TIED ONTO:
NA
SURVEY INTERVAL:
100' From 0 feet to 200 feet
50' From 200 feet to 250 feet
30' From 250 feet to 4435 feet
UTM CO-ORDINATES:
TARGET DIRECTION:
121.99
GRID CORRECTION:
N/A
CALCULATION METHOD:
MINIMUM CURVATURE
SURVEYOR:
TOM STODDARD
SR323.DOC
gyro/data
3. OUTRUN SURVEY LISTING
SR323.DOC
A Gyroda t a D i r e c t i ona i Survey
for
B.P. EXPLORATION
WELL: 1-59/O-24, 10.75
Location: MPI UNIT, ENDICOTT FIELD, ALASKA
Job Number: AK0296G323
Run Date: 7-Feb-96 3:34:47
Surveyor: TOM STODD_~d~.D
Calculation Method: MINIMUM CURVATURE
Survey Latitude: 70.353000 deg. N
Sub-sea Correction from Vertical Reference: 56 ft.
Azimuth Correction:
Gyro: Bearings are Relative to True North
Proposed Well Direction: 121.990 deg
Vertical Section Calculated from Well Head Location
Closure Calculated from Well Head Location
Horizontal Coordinates Calculated from Local Horizontal Reference
A Gyro da t a D i re c t i ona i Survey
B.P. EXPLORATION
WELL: 1-59/O-24, 10.75
Location: MPI UNIT, ENDICOTT FIELD,
Job Number: AK0296G323
ALASKA
MEASURED I N C L AZIMUTH VERTICAL
DEPTH DEPTH
feet deg. deg. feet
VERTICAL
SECTION
feet
SUBSEA DOGLEG CLOSURE
DEPTH SEVERITY DIST. AZIMUTH
feet deg./ feet deg.
100 ft.
0.0 0.00 0.00 0.0 0.0 -56.0 0.00 0.0 0.0
0 - 4435 FT. GYRO MULTISHOT SURVEY IN 10 3/4 IN CASING
ALL MEASURED DEPTHS REFERENCED TO DOYON 15 R.K.B. ELEV: OF 56 FT.
Page
HORIZONTAL
COORDINATES
feet
0.00 N 0.00
100.0 .27 102.92 100.0 .2 44.0 .27 .2 102.9
200.0 .18 114.14 200.0 .6 144.0 .10 .6 105.7
250.0 .32 115.43 250.0 .8 194.0 .28 .9 108.1
280.0 .76 112.79 280.0 1.1 224.0 1..47 1.1 109.4
310.0 1.51 106.68 310.0 1.7 254.0 2.52 1.7 109.2
340.0 1.79 105.59 340.0 2.5 284.0 .96 2.6 108.2
370.0 2.29 111.34 370.0 3.6 314.0 1.78 3.7 108.3
400.0 2.94 115.50 399.9 4.9 343.9 2.25 5.0 109.8
430.0 3.82 118.22 429.9 6.7 373.9 3.00 6.8 111.7
460.0 4.21 117.15 459.8 8.8 403.8 1.33 8.9 113.1
490.0 4.43 118.66 489.7 11.0 433.7 .83 11.1 114.1
520.0 4.74 118.54 519.6 13.4 463.6 1.01 13.5 114.9
550.0 5.23 116.80 549.5 16.0 493.5 1.71 16.1 115.3
580.0 5.53 118.73 579.4 18.8 523.4 1.18 18.9 115.7
610.0 5.79 120.02 609.2 21.8 553.2 .97 21.9 116.2
640.0 6.31 119.96 639.1 24.9 583.1 1.73 25.0 116.7
670.0 6.66 119.76 668.9 28.3 612.9 1.17 28.4 117.0
700.0 6.98 120.94 698.7 31.9 642.7 1.15 32.0 117.4
730.0 7.43 120.28 728.4 35.6 672.4 1.52 35.7 117.8
760.0 8.23 120.75 758.1 39.7 702.1 2.68 39.8 118.0
.05 S .23 E
.17 S .61 E
.26 S .81 E
.38 S 1.07 E
.57 S 1.63 E
.81 S 2.46 E
1.15 S 3.47 E
1.70 S 4.72 E
2.50 S 6.30 E
3.48 S 8.16 ~-
4.54 S 10.16 E
5.69 S 12.26 E
6.89 S 14.57 E
8.21 S 17.06 E
9.66 S 19.64 E
11.24 S 22.38 E
12.93 S 25.32 E
14.73 S 28.39 E
16.64 S 31.63 E
18.72 S 35.15 E
A Gyroda t a D i re c t i ona i Survey
B.P. EXPLORATION
WELL: 1-59/O-24, 10.75
Location: MPI UNIT, ENDICOTT FIELD,
Job Number: AK0296G323
ALASKA
Page
MEASURED I N C L AZIMUTH VERTICAL
DEPTH DEPTH
feet deg. deg. feet
VERTICAL
SECTION
feet
SUBSEA
DEPTH
feet
DOGLEG CLOSURE
SEVERITY DIST. AZIMUTH
deg./ feet deg.
100 ft.
HORIZONTAL
C O O R.D I N A T E S
feet
790.0 8.51 122.25 787.8
820.0 8.62 121.88 817.5
850.0 8.63 122.53 847.1
880.0 8.72 122.01 876.8
910.0 8.92 122.01 906.4
44.1
48.6
53.1
57.6
62.2
731.8
761.5
791.1
820.8
850.4
.19 44.2 118.4
.39 48.6 118.7
.33 53.1 119.0
.38 57.7 119.3
.69 62.2 119.5
21.00 S 38.87
23.37 S 42.66 E
25.77 S 46.46 E
28.19 S 50.29 E
30.62 S 54.19 E
940.0 9.12 121.16 936.1
970.0 9.32 120.05 965~7
1000.0 9.59 118.94 995.3
1030.0 9.83 119.01 1024.9
1060.0 10.19 118.69 1054.4
66.9
71.7
76.6
81.7
86.9
880.1
909.7
939.3
968.9
998.4
.79 66.9 119.6
.90 71.8 119.7
.07 76.7 119.7
.83 81.7 119.6
.20 87.0 119.6
33.09 S 58.20 E
35.53 S 62.33 E
37.96 S 66.62 E
40.41 S 71.05 E
42.93 S 75.62 E
1090.0 10.47 118.49 1083.9
1120.0 10.73 118.50 1113.4
1150.0 11.02 120.26 1142.9
1180.0 11.25 117.44 1172.3
1210.0 11.55 118.44 1201.7
92.2
97.8
103.4
109.2
115.1
1027.9
1057.4
1086.9
1116.3
1145.7
.95 92.3 119.5
.87 97.9 119.5
.45 103.5 119.5
.97 109.3 119.4
.21 115.2 119.4
45.50 S 80.34 E
48.14 S 85.19 E
50.91 S 90.13 E
53.71 S 95.20 E
56.49 S 100.44 ~
1240.0 11.97 119.31 1231.1
1270.0 12.41 119.32 1260.4
1300.0 13.32 116.11 1289.6
1330.0 14.24 117.30 1318.8
1360.0 14.93 117.22 1347.8
121.2
127.5
134.2
141.3
148.8
1175.1
1204.4
1233.6
1262.8
1291.8
.51 121.3 119.3
.47 127.7 119.3
.86 134.4 119.2
.21 141.5 119.1
.29 149.0 119.0
59.44 S 105.79 E
62.54 S 111.31 E
65.64 S 117.23 E
68.86 S 123.61 E
72.32 S 130.33 E
1390.0 15.52 116.23 1376.8
1420.0 15.87 116.07 1405.6
1450.0 16.12 116.65 1434.5
1480.0 16.18 115.40 1463.3
1510.0 16.29 114.93 1492.1
156.7
164.8
173.0
181.3
189.6
1320.8
1349.6
1378.5
1407.3
1436.1
.16 156.9 118.9
.17 165.0 118.8
.99 173.3 118.7
.18 181.6 118.5
.57 190.0 118.4
75.86 S 137.37 E
79.44 S 144.65 E
83.11 S 152.06 E
86.77 S 159.56 E
90.33 S 167.15 E
A Gyr oda t a D i r e c t i ona i Survey
B.P. EXPLORATION
WELL: 1-59/O-24, 10.75
Location,- MPI UNIT, ENDICOTT FIELD,
Job Number: AK0296G323
ALASKA
Page
MEASURED I N C L AZIMUTH VERTICAL
DEPTH DEPTH,
feet deg. deg. feet
VERTICAL
SECTION
feet
SUBSEA
DEPTH
feet
DOGLEG CLOSURE
SEVERITY DIST.. AZIMUTH
deg. / feet deg.
100 ft.
HORIZONTAL
C 0'0 R D I N A T E S
feet
1540.0 16.36 116.37 1520.9
1570.0 16.59 116.59 1549.7
1600.0 16.99 117.87 1578.4
1630.0 16.94 118.40 1607.1
1660.0 16.90 119.11 1635.8
198 .~0
206.5
215.1
223 .8
232.6
1464.9
1493.7
1522.4
1551.1
1579.8
.37 198.4 118.3
.80 206.9 118.2
.82 215.6 118.2
.55 224.3 118.2
.70 233.1 118.2
93.98 S 174.75
97.78 S 182.37 E
101.74 S 190.07 E
105.87 S 197.79 E
110.07 S 205.45 E
1690.0 16.87 118.06 1664.5
1720.0 16.81 119.38 1693.2
1750.0 16.88 120.27 1721.9
1780.0 16.95 122.70 1750.6
1810.0 17.05 124.37 1779.3
241.3
249..9
258.6
267.3
276.1
1608.5
1637.2
1665.9
'1694.6
1723.3
.02 241.8 118.2
.29 250.5 118.2
.90 259.2 118.3
.36 267.9 118.4
.67 276.6 118.5
114.24 S 213.10 E
118.42 S 220.72 E
122.74 S 228.26 E
127.30 S 235.70 E
132.14 S 243.01 E
1840.0 17.08 124.18 1808.0
1870.0 17.03 121.83 1836.7
1900.0 17.04 121.17 1865.3
1930.0 17.17 120.20 1894.0
1960.0 17.38 119.36 1922.7
284.9
293.7
302.5
311.3
320.2
1752.0
1780.7
1809.3
1838.0
1866.7
.22 285.4 118.7
.31 294.1 118.8
.65 302.9 118.9
.05 311.7 119.0
.09 320.7 119.0
137.10 S 250.29 E
141.89 S 257.66 E
146.48 S 265.16 E
150.99 S 272.75 E
155.41 S 280.48 '
1990.0 17.45 117.78 1951.3
2020.0 17.38 117.11 1979.9
2050.0 17.36 116.94 2008.5
2080.0 17.30 117.86 2037.2
2110.0 17.21 117.21 2065.8
329.2
338.1
347.1
356.0
364.8
1895.3
1923.9
1952.5
1981.2
2009.8
.59 329.6 119.0
.72 338.6 118.9
.18 347.6 118.9
.93 356.5 118.9
.70 365.4 118.8
159.70 S 288.36 E
163.84 S 296.33 E
167.91 S 304.31 E
172.02 S 312.24 E
176.14 S 320.13 E
2140.0 17.18 118.27 2094.5
2170.0 17.25 118.22 2123.1
2200.0 17.23 118.82 2151.8
2230.0 17.14 119.04 2180.5
2260.0 17.03 120.25 2209.1
373.7
382.5
391.4
400.3
409.1
2038.5
2067.1
2095.8
2124.5
2153.1
1.05 374.3 118.8
.23 383.1 118.8
.60 392.0 118.8
.37 400.9 118.8
1.25 409.7 118.8
180.26 S 327.98 E
184.47 S 335.81 E
188.71 S 343.62 E
193.00 S 351.38 E
197.36 S 359.04 E
A Gyro da t a D i r e c t i ona i Survey
B.P. EXPLORATION
WELL: 1-59/O-24, 10.75
Location: MPI UNIT, ENDICOTT FIELD,
Job Number: AK0296G323
ALASKA
Page
MEASURED I N C L AZIMUTH VERTICAL
DEPTH DEPTH
feet deg. deg. feet
VERTICAL
SECTION
feet
SUBSEA DOGLEG CLOSURE
DEPTH SEVERITY DIST. AZIMUTH
feet deg./ feet deg.
100 ft.
HORIZONTAL
COORDINATES
feet
2290.0 16.91 119.57 2237.8
2320.0 16.70 119.95 2266.5
2350.0 16.54 120.06 2295.3
2380.0 16.47 120.42 2324.1
2410.0 16.40 120.83 2352.8
417.8
426.5
435.1
443.6
452.1
2181.8 .77 418.5 118.8
2210.5 .81 427.1 118.8
2239.3 .53 435.7 118.9
2268.1 .41 444.2 118.9
2296.8 .47 452.7 118.9
201.73 S 366.63 ~t
206.03 S 374.16 E
210.32 S 381.59 E
214.62 S 388.95 E
218.94 S 396.26 E
2440.0 16.28 120.93 2381.6
2470.0 16.17 122.39 2410.4
2500.0 16.31 120.90 2439.2
2530.0 16.94 121.57 2468.0
2560.0 17.69 121.47 2496.6
460.5
468.9
477.3
485.9
494.8
2325.6 .40 461.2 119.0
2354.4 1.41 469.5 119.0
2383.2 1.46 477.9 119.1
2412.0 2.19 486.5 119.1
2440.6 2.49 495.4 119.1
223.27 S 403.50 E
227.67 S 410.64 E
232.07 S 417.78 E
236.52 S 425.11 E
241.19 S 432.72 E
2590.0 18.29 121.13 2525.1
2620.0 18.75 120.96 2553.6
2650.0 19.76 117.68 2581.9
2680.0 20.26 118.11 2610.1
2710.0 21.02 116.47 2638.2
504.1
513.6
523.5
533.7
544.2
2469.1 2.03 504.7 119.2
2497.6 1.56 514.2 119.2
2525.9 4.93 524.1 119.2
2554.1 1.74 534.3 119.2
2582.2 3.20 544.9 119.1
246.00 S 440.64 E
250.92 S 448.80 E
255.75 S 457.43 E
260.56 S 466.50 E
265.40 S 475.90 -
2740.0 21.95 115.75 2666.1
2770.0 22.79 114.71 2693.8
2800.0 23.65 113.98 2721.4
2830.0 24.47 113.59 2748.8
2860.0 25.27 112.04 2776.0
555.2
566.5
578.2
590.3
602.8
2610.1 3.22 555.9 119.1
2637.8 3.08 567.3 119.0
2665.4 3.02 579.1 118.9
2692.8 2.81 591.2 118.8
2720.0 3.43 603.8 118.7
270.24 S 485.77 E
275.10 S 496.10 E
279.98 S 506.87 E
284.91 S 518.06 E
289.80 S 529.69 E
2890.0 25.94 111.47 2803.1
2920.0 27.08 111.84 2829.9
2950.0 27.95 110.65 2856.5
2980.0 28.38 110.06 2883.0
3010.0 28.95 109.46 2909.3
615.5
628.7
642.3
656.2
670.3
2747.1 2.39 616.7 118.5
2773.9 3.83 630.0 118.4
2800.5 3.43 643.7 118.2
2827.0 1.71 657.7 118.1
2853.3 2.10 672.0 117.9
294.60 S 541.74 E
299.55 S 554.18 E
304.57 S 567.10 E
309.49 S 580.38 E
314.36 S 593.92 E
A Gy r o d a t a
B.P. EXPLORATION
WELL: 1-59/O-24, 10.75
Location: MPI UNIT, ENDICOTT FIELD,
Job Number: AK0296G323
ALASKA
MEASURED I N C L AZIMUTH VERTICAL
DEPTH DEPTH
feet deg. deg. feet
VERTICAL
SECTION
feet
3040.0 29.39 109.19 29~5.5
3070.0 29.71 108.54 2961.6
3100.0 30.04 108.12 2987.6
3130.0 29.98 107.84 3013.6
3160.0 29.93 108.39 3039.6
3190.0 29.77 108.06 3065.6
3220.0 29.39 108.35 3091.7
3250.0 29.20 108.97 3117.8
3280.0 28.72 109.46 3144.1
3310.0 28.44 109.66 3170.4
3340.0 28.36 110.83 3196.8
3370.0 28.11 109.77 3223.3
3400.0 28.30 109.07 3249.7
3430.0 28.38 109.77 3276.1
3460.0 28.00 110.11 3302.5
3490.0 27.78 109.70 3329.1
3520.0 27.75 109.99 3355.6
3550.0 27.33 109.92 3382.2
3580.0 27.19 110.00 3408.9
3610.0 27.36 110.15 3435.5
3640.0 27.50 109.14 3462.2
3670.0 27.95 109.76 3488.7
3700.0 28.28 109.36 3515.2
3730.0 28.56 108.95 3541.6
3760.0 28.88 108.12 3567.9
684.5
698.9
713.5
728.0
742.6
757.1
771.4
785.7
799.9
813.9
827.9
841.8
855.6
869.5
883.4
897.1
910.8
924.3
937.8
951.2
964.7
978.3
992.1
1006.1
1020.1
Directional Survey
SUBSEA DOGLEG CLOSURE
DEPTH .SEVERITY DIST. AZIMUTH
feet deg./ feet deg.
100 ft.
2879.5 1.55 686.4 117.7
2905.6 1.50 701.1 117.5
2931.6 1.29 715.8 117.3
2957.6 .50 730.6 117.1
2983.6 .92 745.4 117.0
3009.6 .75 760.2 116.8
3035.7 1.35 774.8 116.6
3061.8 1.19 789.4 116.5
3088.1 1.79 803.8 116.3
3114.4 .98 818.0 116.2
Page 5
HORIZONTAL
C O O R D I N A T E S
feet
319.19 S 607.72
323.98 S 621.72 E
328.68 S 635.91 E
333.31 S 650.18 E
337.97 S 664.41 E
342.64 S 678.60 E
347.26 S 692.66 E
351.96 S 706.57 E
356.74 S 720.29 E
361.55 S 733.81 E
3140.8 1.88 832.2 116.1 366.48 S 747.20 E
3167.3 1.88 846.4 116.0 371.41 S 760.51 E
3193.7 1.27 860.4 115.9 376.12 S 773.88 E
3220.1 1.15 874.6 115.8 380.86 S 787.31 E
3246.5 1.37 888.7 115.7 385.69 S 800.63 ~
3273.1 .98 902.6 115.6
3299.6 .46 916.6 115.5
3326.2 1.43 930.4 115.5
3352.9 .46 944.0 115.4
3379.5 .59 957.7 115.3
390.47 S 813.83 E
395.21 S 826.97 E
399.94 S 840.01 E
404.64 S 852.92 E
409.35 S 865.84 E
3406.2 1.62 971.5 115.2 414.00 S 878.85 E
3432.7 1.77 985.4 115.1 418.65 S 892.01 E
3459.2 1.29 999.4 115.1 423.38 S 905.33 E
3485.6 1.12 1013.6 115.0 428.07 S 918.82 E
3511.9 1.71 1028.0 114.9 432.65 S 932.49 E
A Gyroda t a Di re c t i ona i Survey
B.P. EXPLORATION
WELL: 1-59/O-24, 10.75
Location: MPI UNIT, ENDICOTT FIELD,
Job Number: AK0296G323
ALASKA
Page
MEASURED I N C L AZIMUTH VERTICAL
DEPTH DEPTH.
feet deg. deg. feet
3790.0 29.35 107.90 3594.1
3820.0 29.54 107.57 3620.2
3850.0 29.39 107.63 3646.3
3880.0 29.48 107.79 3672.5
3910.0 29.45 108.07 3698.6
VERTICAL
SECTION
feet
SUBSEA DOGLEG CLOSURE
DEPTH SEVERITY DIST. AZIMUTH
feet deg./ feet deg.
100 ft.
1034.3 3538.1 1.60 1042.5 114.8
1048.5 3564.2 .85 1057.1 114.7
1062.8 3590.3 .51 1071.7 114.6
1077.1 3616.5 .39 1086.4 114.5
1091.4 3642.6 .46 1101.0 114.4
HORIZONTAL
COORDINATES
feet
437.16 S 946.37
441.66 S 960.42 E
446.12 S 974.49 E
450.60 S 988.53 E
455.15 S 1002.57 E
3940.0 29.28 107.76 3724.7
3970.0 29.20 108.52 3750.9
4000.0 29.09 108.46 3777.1
4030.0 29.15 109.53 3803.3'
4060.0 28.95 110.25 3829.5
1105.7 3668.7 .75 1115.7 114.3
1119.9 3694.9 1.27 1130.2 114.3
1134.2 3721.1 .39 1144.8 114.2
1148.4 3747.3 1.75 1159.3 114.1
1162.6 3773.5 1.33 1173.8 114.1
459.67 S
464.23 S
468.87 S
473.62 S
478.58 S
1016.57 E
1030.50 E
1044.35 E
1058.16 E
1071.85 E
4090.0 29.06 110.10 3855.8
4120.0 29.12 110.44 3882.0
4150.0 29.11 111.52 3908.2
4180.0 28.99 111.90 3934.4
4210.0 28.88 112.20 3960.7
1176.9 3799.8 .44 1188.4 114.0
1191.1 3826.0 .58 1202.9 114.0
1205.5 3852.2 1.75 1217.5 113.9
1219.8 3878.4 .73 1232.0 113.9
1234.1 3904.7 .60 1246.5 113.9
483.59
488.64
493.87
499.26
504.70
1085.51 E
1099.19 E
1112.82 E
1126.35 E
1139.80 ~
4240.0 28.72 112.59 3987.0
4270.0 28.74 112.72 4013.3
4300.0 28.73 113.08 4039.6
4330.0 28.75 113.00 4065.9
4360.0 28.87 111.08 4092.2
1248.3 3931.0 .82 1261.0 113.9
1262.6 3957.3 .21 1275.4 113.9
1276 . 8 3983 . 6 . 57 1289 . 8 113 . 8
1291.1 4009.9 .15 1304.3 113.8
1305.3 4036.2 3 .11 1318.7 113.8
510.21 S
515.77 S
521.38 S
527.02 S
532.45 S
1153.16 E
1166.47 E
1179.76 E
1193.03 E
1206.43 E
4390.0 28.80 111.02 4118.5
4420.0 28.86 110.77 4144.7
4435.0 28.92 111.03 4157.9
1319.5 4062.5 .23 1333.2 113.8
1333.7 4088.7 .45 1347.6 113.8
1340.8 4101.9 .92 1354.8 113.7
537.64
542.80
545.39
1219.93 E
1233.45 E
1240.22 E
Final Station Closure: Distance: 1354.84 ft Az: 113.74 deg.
A Gyroda t a D i re c t i ona i Survey
for
B.P. EXPLORATION
WELL: 1-59/O-24, 10.75
Location: MPI I/NIT, ENDICOTT FIELD, ALASKA
Job Number: AK0296G323SS
Run Date: 7-Feb-96 3:34:47
Surveyor: TOM STODDARD
Calculation Method: MINIMUM CURVATURE
Survey Latitude: 70.353000 deg. N
Sub-sea Correction from Vertical Reference: 56 ft.
Azimuth Correction:
Gyro: Bearings are Relative to True North
Proposed Well Direction: 121. 990 deg
Vertical Section Calculated from Well Head Location
Closure Calculated from Well Head Location
Horizontal Coordinates Calculated from Local Horizontal Reference
A Gy r o d a t a
B.P. EXPLORATION
WELL: 1-59/O-24, 10.75
Location: MPI UNIT, ENDICOTT FIELD,
Job Number: AK0296G323SS
ALASKA
SUBSEA I N C L AZIMUTH VERTICAL
DEPTH DEPTH
feet deg. deg. feet
D i r e c t i
VERTICAL DOGLEG
SECTION SEVERITY
feet deg./
100 ft.
-56.0 0.00 0.00 0.0 0.0 0.00
o n a 1 Survey
Page
CLOSURE
DIST. AZIMUTH
feet deg.
0.0 0.0
HORIZONTAL
COORDINATES
feet
0.00 N 0.00 E
0 - 4435 FT. GYRO MULTISHOT SURVEY IN 10 3/4 IN CASING
ALL MEASURED DEPTHS REFERENCED TO DOYON 15 R.K.B. ELEV. OF 56 FT.
100.0 .22 109.21 156.0 .4 .18 .6
200.0 .41 114.90 256.0 .9 .52 1.1
300.0 2.06 108.66 356.0 3.1 1.40 3.7
400.0 4.16 117.29 456.0 8.5 1.55 8.9
500.0 5.29 117.22 556.0 16.6 1.59 18.9
600.0 6.51 119.85 656.0 26.9 1.42 28.4
700.0 8.17 120.71 756.0 39.4 2.60 39.8
800.0 8.66 122.38 856.0 54.4 .34 57.7
900.0 9.26 120.41 956.0 70.1 .87 71.8
1000.0 10.21 118.68 1056.0 87.2 1.19 92.3
1100.0 11.12 119.00 1156.0 106.0 1.68 109.3
1200.0 12.35 119.32 1256.0 126.6 1.48 127.7
1300.0 15.10 116.94 1356.0 151.1 2.25 156.9
1400.0 16.17 115.72 1456.0 179.2 1.13 181.6
1500.0 16.68 116.88 1556.0 208.4 1.02 215.6
1600.0 16.88 118.37 1656.0 238.7 .93 241.8
1700.0 16.97 123.01 1756.0 269.0 2.23 276.6
1800.0 17.04 121.38 1856.0 299.6 1.19 302.9
1900.0 17.44 117.67 1956.0 330.7 1.45 338.6
2000.0 17.24 117.43 2056.0 361.8 .78 365.4
104.5
108.3
108.3
112.9
115.4
116.9
118.0
119.1
119.7
119.6
119.4
119.3
119.0
118.6
118.2
.12 S .45 E
.29 S .86 E
.99 S 3.00 E
3.35 S 7.92 E
7.18 S 15.11 E
12.20 S 24.05 E
18.57 S 34.90 E
26.49 S 47.61 E
34.73 S 60.98 E
43.07 S 75.88 E
52.16 S 92.39 E
62.08 S 110.49 E
73.32 S 132.32 E
85.84 S 157.66 E
98.65 S 184.07 E
118.2 113.01 S 210.84 E
118.4 128.21 S 237.07 E
118.9 144.99 S 262.72 E
119.0 160.39 S 289.67 E
118.8 174.73 S 317.42 E
A Gyrodat a D i re c t i ona i Survey
B.P. EXPLORATION
WELL: 1-59/O-24, 10.75
Location: MPI UNIT, ENDICOTT FIELD,
Job Number: AK0296G323SS
ALASKA
Page
SUBSEA I N C L AZIMUTH VERTICAL
DEPTH DEPTH
feet deg. deg. feet
VERTICAL DOGLEG CLOSURE
SECTION SEVERITY DIST. AZIMUTH
feet deg./ feet deg.
100 ft.
HORIZONTAL
COORDINATES
feet
2100.0 17.22 118.85 2156.0
2200.0 16.78 119.81 2256.0
2300.0 16.38 120.84 2356.0
2400.0 16.68 121.29 2456.0
2500.0 18.83 120.68 2556.0
392.7 .56 400.9 118.8
423.3 .80 427.1 118.8
453.0 .46 461.2 118.9
482.3 1.89 486.5 119.1
514.4 1.84 524.1 119.2
189.34 S 344.76 E
204.45 S 371.39 E
219.42 S 397.05 E
234.67 S 422.06 E
251.33 S 449.54 E
2600.0 21.62 116.01 2656.0
2700.0 24.68 113.18 2756.0
2800.0 27.94 110.67 2856.0
2900.0. 29.64 108.68 2956.0
3000.0 29.83 108.18 3056.0
551.2 3.21 555.9 119.1
593.6 2.97 603.8 118.8
642.1 3.44 643.7 118.2
695.9 1.51 701.1 117.6
751.7 .82 760.2 116.9
268.49 S 482.20 E
286.20 S 521.14 E
304.47 S 566.85 E
322.95 S 618.73 E
340.91 S 673.37 E
3100.0 28.60 109.55 3156.0
3200.0 28.32 109.24 3256.0
3300.0 27.75 109.99 3356.0
3400.0 27.47 109.37 3456.0
3500.0 28.74 108.50 3556.0
806.2 1.43 818.0 116.3
858.9 1.24 874.6 115.9
911.0 .47 930.4 115.5
961.6 1.39 971.5 115.2
1013.8 1.44 1028.0 114.9
358.91 S 726.40 E
377.25 S 777.09 E
395.28 S 827.16 E
412.92 S 875.84 E
430.58 S 926.32 E
3600.0 29.42 107.69 3656.0
3700.0 29.18 108.51 3756.0
3800.0 29.06 110.10 3856.0
3900.0 28.90 112.15 3956.0
4000.0 28.74 113.03 4056.0
1068.1 .46 1086.4 114.6
1122.7 1.10 1144.8 114.2
1177.0 .44 1202.9 114.0
1231.5 .62 1246.5 113.9
1285.7 .31 1304.3 113.8
447.78 S 979.69 E
465.14 S 1033.20 E
483.64 S 1085.63 E
503.73 S 1137.40 E
524.90 S 1188.05 E
4100.0 28.91 110.99 4156.0
4101.9 28.92 111.03 4157.9
1339.8 .85 1354.8 113.7
1340.8 .92 1354.8 113.7
545.02 S 1239.26 E
545.39 S 1240.22 E
Final Station Closure: Distance: 1354.84 ft Az: 113.74 deg.
gyro/data
4. QUALITY CONTROL
SR323.DOC
Quality Control Comparisons
B.P. EXPLORATION
WELL: 1-59/0-24, 10.75
Location: MPI I/NIT, ENDICOTT FIELD,
ALASKA
Job Number : AK0296G323
/ AK0296G323
INRUN/OUTRUN Comparison
INRUN OUTRUN INRUN OUTRUN
Depth Inc Inc Delta Az Az
1000.0 9.44 9.59 -.146 118.65 118.94
2020.0 17.53 17.38 .149 117.95 117.11
3010.0 28.79 28.95 -.159 110.41 109.46
4000.0 29.10 29.09 .011 109.34 108.46
For Inclinations Greater than 10 degrees:
Average Inclination Difference = .00023 deg.
Average Azimuth Difference = .89415 deg.
Delta
-.286
.846
.954
.882
gyro/data
QUALITY CONTROL REPORT
JOB NUMBER: AK0296G323
TOOL NUMBER:
08O
MAXIMUM GYRO TEMPERATURE:
78.70C
MAXIMUM AMBIENT TEMPERATURE:
58.1C
MAXIMUM INCLINATION:
29.54
AVERAGE AZIMUTH:
113.74
WIRELINE REZERO VALUE:
REZERO ERROR / K:
CALIBRATION USED FOR FIELD SURVEY:
1248
CALIBRATION USED FOR FINAL SURVEY:
1248
PRE JOB MASS BALANCE OFFSET CHECK:
.07
POST JOB MASS BALANCE OFFSET CHECK~ :
CONDITION OF SHOCK WATCHES
.24
USED .10
UPON ARRIVAL AT RIG:
OK
UPON COMPLETION OF SURVEY:
OK
UPON RETURN TO ATLAS
OK
BOTTOM LINE COMPARISIONS
M.D. INC AZIMUTH TVD NORTHING EASTING
FIELD SURVEY 4435 28.92 111.03 4157.9 545.4S 1240.2E
FINAL SURVEY 4435 28.92 111.03 4157.9 545.39S 1240.22E
SR323.DOC
gyro/data
FUNCTION TEST
JOB NUMBER' AK0296G323
5 Survey stations were collected at the measured depth shown below. The tables show the repeatability
of the gyro tool in both inclination and azimuth at one measured depth.
INCLINATION
M.D. ff 1 2 3 4 5
4435 28.92 28.92 28.92 28.92 28.92
AZIMUTH
M.D. ft 1 2 3 4 5
4435 110.73 110.83 111.02 110.98 111.03
SR323.DOC
gyro/data
5. EQUIPMENT AND CHRONOLOGICAL REPORT
SR323.DOC
gyro/data
EQUIPMENT REPORT
JOB NUMBER: AK0296G323
DOWNHOLE ELECTRONICS
SURFACE ELECTRONICS
PRIMARY
TOOL No. 080
GYRO SECTION A0099
DATA SECTION C0031
POWER SECTION C0006
BACKUP
TOOL No. 713
GYRO SECTION A0088
DATA SECTION C0023
POWER SECTION C0022
COMPUTER
POWER SUPPLY
PRINTER
INTERFACE
COMPUTER
POWER SUPPLY
PRINTER
INTERFACE
A0213
A0085
A0029
A0035
A0215
A0055
A0079
A0071
WIRELINE COMPANY:
CABLE SIZE:
ATLAS WIRELINE
5/16"
RUNNING GEAR
2 1/2" SYSTEM
TOTAL LENGTH OF TOOL'
MAXIMUM O.D.:
17.5 feet
2.5 INCHES
TOTAL WEIGHT OF TOOL:
240Lbs
SR323.DOC
gyro/data
CHRONOLOGICAL REPORT
JOB NUMBER: AK0296G323
2/4/96
2/5/96
2/6/96
16:15
17:30
19:40
23:00
23:50
2/7/96
01:00
STANDBY
STANDBY
ARRIVED AT LOCATION
SPOT UNIT,~ MAKE UP TOOL, STAND BY FOR RIG
PICK UP TOOL
LAY DOWN TOOL
PROCESS SURVEY
RETURN TO ATLAS
SR323.DOC
LARRY GRANT
Attn. ALASKA OIL + GAS CONSERVATION
3001 PORCUPINE DRIVE
ANCHORAGE
AK, 99501.
Date:
RE:
23 February 1996
Transmittal of Data
ECC #: 6601.00
Sent by: HAND CARRY
Data: OH-LDWG
Dear Sir/Madam,
Reference:
1-59/O-24PH
ENDICOTT
NORTH SLOPE, AK
Enclosed, please find the data as described below:
Tapes/Diskettes: 1
LDWG TAPE+LIS
Run # 1
Please sign and return to: Attn. Rodney D. Paulson
Western Atlas Logging Services
5600 B Street
Suite 201
Anchorage, AK 99518
Or/~ to (907) 563-7803
Received by: Date:
1. Type of Request:
04;46PM BP E×P/ORRTIOH
STATE OF ALASKA
, .....~A OIL AND GAS CONSERVATION COMMISS~..
APPLICATION FOR SUNDRY APPROVALS
P.2/4
Abandon __ Suspend __ Operation Shutdown ..X--. Re-enter suspended well__
Alter casi'ng __ Repair well Plugging Time exlenslon __ Stimulate __
Change approved program . Pull tubing , Variance__ Perforate __ Othe[
2. Name of Operator
BP ~/oration (Alaska)/nc.
3. Address
P. O. Box 196612, Anchorage, Alaska 99519-6812
4. Location of well at surface
$085' NSL, 2202' WEL, SEC. 36, T12N, R16E
At top of productive interval
At effective depth
At total depth
Type of Well:
Development
Exploratory'
Slrailgraphlc
Service
ORIGINAL
6. Datum elevation (DF or KB)
KBE ~ 56
7. Unit or Property name
Duck Island Unit/Endicoff
8. Well number
1.59/0.24
9. Permit number
96-22
10. APl number
50- 029-22644
11, Field/Pool
Endicott Oil Pool
feet
12. Present well condition summary
Total depth: measured
Effective depth;
Casing
Structural
Conductor
Surface
Intermediate
Production
Liner
Perforation depth:
true vertical
measured
true vertical
Length
90'
4681'
measured
12090 feet Plugs (measured)
10215 feet
10888 feet Junk (measured)
9537 feet
cement plugs 12090'-10088', 5228'4537'
Size Cemented Measured depth True vertical depth
true vertical
Tubing (size, grade, and measured depth)
Packers and SSSV (type and measured depth)
30" Driven 110' 110'
fo-~/z' ~=~r~,~=.~ ~,~. 4737' 4421'
13. Attachments Description summary of proposal X Detailed operations program BOP sketch
15. Status of well classification as:
14. Estimated date for commencing operation
02_220/96
16. If proposal was verbally approved
Name of epprover
Date approved
Oil X Gas__ Suspended
Sea, ice
17. I hereby certify that tl~e foreg({i,ug is true and correct to the best of my knowledge, Fcc, I~.T~¢I~ i~ro~,m~'r~o~,
Signed /~ ~~. Title Drilling Engineer Supervisor Date
__ [/ -~ ~='on 'COMMISSION USE ONLY
ConditiOns of api~;'oval: N6tify_,Commission so representative may witness i Approval No; c)'/'~.
Plug integrity ~ BOP Test Location clearance ~ _ ~o~,roved Co,.,I,, -
Mechanical Integrity Test_ ,,~~.~j~r~)gired ~0- Z{ o 7 ' ' ~eturned ~'~
W, Johnston .
Approved by order of the Commission ..... Commis~ioher ~ Date
Form 10-403 Rev 06/15/88
SUBMIT IN TRIPLICATE
FES 20 '96 04:46PH BP EXPLORRTIOH
Alaska Oil and Gas Conservation Commision
3001 Porcupine Dr.
Anchorage Ak. 99501
Pilot Hole Suspension Plug
Well 1-59/O-24
RIH to TD of pilot hole 12090 MD with 5 drillpipe and 3.5
drillpipe stinger open ended. Circulate.
Notify AOCGG 24 hours in advance of witnessing tagging the
abandonment plug.
RU Halliburton, Lay 130 bbl of balanced plugs across the
reservoir.
Volume based on bringing cement top 300' above reservoir and
10% excess over gauge hole.
G Cement +.2%Halad 344+.2% CFR-2
15.8 ppg
1,15 Yield
TT 3 Hours
POH . RII-I with bit and circulate to top of cement. Tag cement
10 hours after placing cement to confirm placement 100'
minimum above the top of the reservoir with 15,000#. Tagging
to be witnessed by AOGCC..
POH RIH open ended to 5760' leavir~g mud of drilling weight or
greater between plugs. Spot 50 bbl high viscosity pill of weight
equal to or greater than mud weight..POH to 5240 circulate
and lay cement plug..
Lay 81 bbl balanced plug .Volume based on placing cement to
200' above casing shoe and 500' + 30% excess in open hole
G Cement .2% CaC1
15.8 ppg
1.15 Yield
TI' 5 hours
POH PU bit, RIH tag cement after a minimum of 8 hours of
WOC ,AOGCC to witness tagging with 15000 #, Plug to also be
Gas Cons.
FE~ 20 '96 04:47PH ~P E×PLORgTIOH P.4/4
pressured tested to 1500 psi and pressure test to be wimessed
by AOGCC.
8 POH spot freeze protection diesel to 1500'
9 Pull bowl protector.
10 Install one joint of tubing and tubing hanger. Install BPV.
11 ND BOP, NU dry hole tree and test to 5000 psi. RDMO
BP EXPLORATION (ALA&
PRUDHOE BAY, ALASKA
FAX # (907) 564-5193
TO: Blair Wondzell
COMPANY: AOGCC
II
LOCATION: Anchorage
Ill ._.
FAX #:
276-7542
FROM: Kathy Campoamor
I
SHARED SERVICES DRILLING
LOCATION: ANCHORAGE, ALASKA
PHONE #: 564-5122
.
PAGES TO FOLLOW: 3
DATE: 2-20-96
COMMENTS: 10-403 for 1-5910-24. "TREAT AS ORIGINAL'
I'F YOU DO NOT RECEIVE ALI. PAGES, OR HAVE ANY PROBLEMS,
PLEASE CALL THE FOLLOWING NUMBER;
(907) 564-$122
P. 1/4
Memorandum
To:
Alaska Oil and Gas Conservation Commision
3001 Porcupine Dr.
Anchorage Ak. 99501
Date: Sunday 2-18-96
From:
R,B. Laule ~'~
Subject: Su_spensiorl pI,a,n for Endicott Well 1-~;9J_0_-.24
8
9
10
11
RIH to TD of pilot hole 12090 MD with 5 drillpipe and 3,5 drillpipe stinger open
ended. Circulate.
Notify AOCGG 24 hours in advance of witnessing tagging the abandonment plug.
RU Halliburton. Lay 130 bbl of balanced plugs across the reservoir,
Volume based on bringing cement top 300' above reservoir and 10% excess over
gauge hole.
G Cement +.2%Halad 344+,2% CFR-2
15.8 ppg
1.15 Yield
'ir 3 Hours
POH to surface shoe and WOC. RIH and circulate to top of cement. Tag cement
12 hours after placing cement to confirm placement 100' minimum above the top
of the reservoir with 15,000#. Tagging to be witnessed by AOGCC..
POH to 5760' leaving mud of drilling weight or greater between plugs. Spot 50 bbl
high viscosity pill of weight equal to or greater than mud weight, ,POH to 5240
circulate and lay cement plug..
Lay 81 bbl balanced plug .Volume based on placing cement to 200' above
casing shoe and 500' + 30% excess in open hole
G Cement ,2% CaCI
15,8 ppg
1.15 Yield
-ir 5 hours
POH PU bit. RIH tag cement after a minimum of 8 hours of WOC .AOGCC to
witness tagging with 15000 #. Plug to also be pressured tested to 1500 psi and
pressure test to be witnessed by AOGCC.
POH spot freeze protection diesel to 1500'
Pull bowl protector.
Install one joint of tubing and tubing hanger. Install BPV.
ND BOP. NU dry hole tree and test to 5000 psi. RDMO
ALASKA OIL A~ GAS
CONSERVATION COM~ISSION
TONY KNOWLE$, GOVERNOR
3001 PORCUPINE DRIVE
ANCHORAGE, ALASKA 99501-3192
PHONE: (907) 279-1433
FAX: (907) 276-7542
February 9, 1996
Tim Schofield, Senior Ddlling Engineer
BP Exploration (Alaska), Inc.
P O Box 196612
Anchorage, AK 99519-6612
Re:
Company
Permit #
Surf Loc
Btmhole Loc
Duck Island Unit/Endicott 1-59/0-24 Revised
BP Exploration (Alaska), Inc.
96-22
3083'NSL, 2202' WEL, Sec 36, T12N, R16E, UM
372'NSL, 1872' WEL, Sec 31, T12N, R17E, UM
Dear Mr. Zanghi'
Enclosed is the approved revised application for permit to ddil the above referenced well,
The provisions of the original approved permit dated January 31, 1996 are in effect for this
revision.
·
ChairmanBy ORDER
/encl
c: Dept of Fish & Game, Habitat Section - w/o encl
Dept of Environmental Conservation - w/o encl
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
PERMIT TO DRILL
2O AAC 25.005
la. Type of work Drill [] Redrill FIIlb. Type of well. Exploratoryl-I Stratigraphic Test [] Development Oil []
Re-Entry [] DeepenI-II Service [] Development Gas [] Single Zone [] Multiple Zone []
2. Name of Operator 5. Datum Elevation (DF or KB) 10. Field and Pool
BP Exploration KBE = 56 feet Endicott Field/Endicott Pool
3. Address 6. Property Designation
P. O. Box 196612, Anchorage, Alaska 99519-6612 ADL 312828
4. Location of well at surface 7. Unit or property Name 11. Type Bond(see 2o AAC 25.025)
3083' NSL, 2202' WEL, SEC. 36, T12N, R16E Duck Island Unit/Endicott
At top of productive interval 8. Well number Number
664' NSL, 2600' WEL, SEC. 31, T12N, R17E 1-59/0-24 2S100302630-277
At total depth 9. Approximate spud date Amount
372' NSL, 1872' WEL, SEC. 31, T12N, R17E 02/01/96 $200,000.00
12. Distance to nearest 13. Distance to nearest well 14. Number of acres in property 15. Proposed depth (MD andTVD)
property line
ADL 047502 372 feet No Close Approach feet 4300 12365'MD /10076'TVD feet
16. To be completed for deviated wells 17. Anticipated pressure (see 20 AAC 25.035 (e)(2))
Kickoff depth 300 feet Maximum hole angle 90 o Maximum surface 4254 psig At total depth (TVD) 9761'/5230 psig
18. Casing program Specifications Setting Depth
s~ze Top Bottom Quantity of cement
Hole Casing Weight Grade Coupling Length MD TVD M D TVD (include stage data)
30" Struct. Drive Pipe 90' Surface surface 90' 90' Drive
13-1/2" 10-3/4" 45.5# L-80 BTC 5364' Surface Surface 4741' 4431' 770sxPF'E', 493sx'G', 150sxPF'E'
9-7/8" 7-5/8" 29.7# uss-95 Butt 11478' Surface Surface 11478' 10076' 310 sx Class 'G'
6-3/4" 4-1/2" 12.6# L-80 886 11478' 1OO76' 12364' 10076' Uncemented Slotted Liner
119. To be completed for Redrill, Re-entry, and Deepen Operations.
Present well condition summary
Total depth: measured feet Plugs (measured)
true vertical feet
Effective depth: measured feet Junk (measured)
true vertical feet
Casing Length Size Cemented Measured depth True Vertical depth
Conductor Structural ~;- ~:,~; ~.,,;-,' ~:~, i
Surface
Intermediate FEB 0 3
Production
Perforation depth: measured
true vertical
20. Attachments Filing fee [] Property plat [] BOP Sketch [] Diverter Sketch [] Drilling program[]
iDrilling fluid program [] Time vs depth plot [] Refraction analysis [] Seabed reportl-I 20 AAC 25.050 requirements[]
,21. I hereby c~t/f.,/~ the~_ k ,,~ '_~.~L°retg°ing~'is/jtr~e and correct to the best of my knowledge//'~
Signed ._.~,,"~t..o~/¢'~o~. Title Senior Drilling Engineer Date ,2.
h//u Commission Use Only ' / -
Permj.LNumber APl mber Apprt/~ ~.a~.. ¢~:2 for other requirements
~'~" - ~ ~__, 15 0-_,C~ ~__ ~' - ~ ~ ~' ~'' ~/ v_.al See cover letter
Conditions of approval Samples required [] Yes ~ No Mud Icg required []Yes ~ No
Hydrogen sulfide measures ~ Yes [] No Directional survey requtred ,~ Yes [] No
Required working pressure ~i¢~i~yi-13M; ~5M; •10M; []15 ·
M;
Other: David W, Johnston by order of
Approved by Commissioner the commission Date
Form 10-401 Rev. 12-1-85
Submit in
Well Name: 1-59/O-24
Well Plan Summary
Type of Well (producer or injector): I Producer
Surface Location: 3083 FSL 2202 FEL S36 T12N R16E UM
Bottom Hole Location: 664FSL 2600 FEL S31 T12N R 17E UM
Bottom Hole Location: 372 FSL 1872 FEL S31 T 12N R17E UM
I AFENumber: 1727104 I
I Estimated Start Date: I 2-1-96 I
I Rig: I DOYON 15
I Operating days to complete: I 33
IMD: I 12365 I ITVD: 110076 I IKBE:
[56
Well Design (conventional, sHmhole, etc.): I SLIMHOLE HORIZONTAL
Formation Markers Horizontal Well Bore:
Formation Tops TVD BKB MD Pilot MD
Horizontal
UPPER SV SHALE 3366 3532
BASE UPPER SV 3686 3896
TOP SV MARINE 4131 4401
SHALE
BASE SV 4246 4536
MARLINE SHALE
SV-5 4266 4559
BASE SV-5 4531 4861
TOP UGNU 5656 6134
TOP WEST SAK 6831 7491
TOP 7731 8534
SEABEE/AYLYAK
TOP SHALE 8895 9889 9884
WALL/TUFFS
HRZ 9426 10674 10499
BASE HRZ 9686 11127 10801
PUT RIVER
LCU top 9706 11162 10824
KEKIKTUK 3B 9706 11162 10824 5230 psi
3A 9906 11510 11061 4640 psi.
2B 10016 11702 11235 4638psi.
Well Plan Summary Page 1
2M 10146 11929 Abent in
horzintal
well
2A 10201 12024 absent in 4346 psi.
horizontal
well
lC 10376 4989 psi
Casing/Tubing Prol,ram.
Hole Size Csg/ Wt/Ft Grade Conn Length Top Btm
Tbg O.D. MDfrVD MDfrVD
13.5 10.75 45.5 L-80 BTC 5364 0 4741/4431
9.875 7.625 29.7 USS-95 Butt 11478 0 11478/10076
6.75 4.5 12.6 L-80 1264 11478/10076 12364/10076
Logging Prol
Open Hole Logs:
I Cased Hole Logs:
r ·
,ram.
DIL/MSFL/LDT/CNL/GR
FMT 10-15 points dependent on hole conditions
Horizontal Hole MWD,GR restivity
SBT
Mud Program:
ISpecialdesignc°nsiderati°ns [Refert°attachedchange°verpr°cuduret°dissplacemudt°]Flo-ero
Surface Mud Properties: I SPUD
Density Marsh Yield 10 sec 10 min pH Fluid
(PPG) Viscosity Point gel gel Loss
8.5 300 40-60 30-60 60-80 8.5-9.5 none- 10
to to to to to to to
9.5 100 20-40 15-20 20-30 8.5-9.5 none- 10
Intermediate Mud Properties: Subject to Pilot Hole Properties. The mud weight in the
change based on pilot hole drilling results, intermediate hole may vary based on the pilot
hole results.
Density Marsh Yield 10 sec 10 rain pH Fluid
(PPG) Viscosity Point gel gel Loss
9.2-10.5 50-6- 20-30 12-15 25-30 9.5-10.0 <6
to to to to to to to
Lubtex as rec uired.
Well Plan Summary
Page 2
Production Mud Properties: Subject to ] FLO_PRO
change based onPilot hole drilling results
I
Density Marsh Yield 10 sec 10 min LSRV Fluid
(PPG) Viscosity Point gel gel cps Loss
9.3 NA 40-45 18-23 24-29 + 50,000 +6
Clorided mg/liter + 40,000
K:N ratio > 1
Well Control:
Well control equipment consisting of 5000 psi W.P. pipe rams, blind rams, and annular preventer
will be installed and is capable of handling maximum potential surface pressures.
Diverter, B OPE and drilling fluid system schematics on file with AOGCC.
Directional:
[KOP: [300
Maximum Hole Angle:
Close Approach Well:
52 in pilot hole and 90.0 in High angle hole
NONE
The above listed wells will be secured during the close approach.
Deep well intersections 5-02/SD-10.
Disposal:
Annular Injection:
The Doyon solids handling unit will be utilized for the entire well.
cannot be injected should be hauled to CC-2A.
All other cuttings that
Insure the Annular Injection Guidllines are followed. DO NOT EXCEED
35,000 bbls IN ANY ANNULUS. Maximum injection rate is 3 BPM and
maximum volume is 1,000 bbls in any 24 hr period. Maximum injection
pressure is 2000 psi. The following well(s) are approved for annular
injection:
AREA WELL PREV VOL PERMITTED PERMIT'I'ED DATES
INJECTED VOL
(BBLS) (BBLS)
END - MPI 2-40/S-22 16242 25,000 1-1-95 to 12-05-96
9-16-95
END _ MPI 1-31/M-21 0 25,000 1-1-95 to 12-05-96
END-MPI 1-19/I-18 0 25,000 6-28-95 to 6-28-96
E N D-M PI 1-33/M-23 Suspended
END_MPI 1-03/P-16 0 25,000 9-21-95 to 9-21-96
END_MPI 2-48/O-13 0 25,000 10-19-95 to 10-19-
96
END_MPI 1-61/Q-20 0 25,000 1/1/95 to 12/05/96
END-MPI 1-59/0-24 0 25,000 SEE A-I-I-ACHED PERMIT
Well Plan Summary Page 3
END-MPI 1-65/N-25 0 25,000 12-05-95 to 12-05-
96
END - MPI 1-23/O-15 20464 25,000 1-1-95 to12-05-96
3-31-95
Well Plan Summary Page 4
1-59/0-24
OPERATIONS SUMMARY:
Dig out cellar, Weld on landing ring. Ensure landing ring is the proper
height with Endicott Field personnel install diverter.
MIRU Doyon 15.
Hold pre spud meeting with crew.
1. Test diverter. Drill 13-1/2" surface hole. Use gyro for close
approach until magnetic interference is past. Check with
Anadrill & Gyrodata to insure they are following JORPS.
Drill hole to 4741' TVD.
2. Run 10-3/4" 45.5 ppf surface casing
3. Cement surface casing.
4. Perform top job, if necessary with 150 sx Type "E"
Permafrost cement.
5. ND diverter. NU Bop's & test.
6. Drill out shoe and perform LOT.
7. Directionally drill pilot hole to 10271 TVD' 12146MD. Well
site geologist will help pick final TD (175' below the base of
the horizontal target interval)..Have sample catchers and
well site geologist on site before drilling the Kekiktuk.
9. Use key seat wiper for Tuffs and HRZ
10. RU E/Line & run open hole logs ("Triple Combo" ).+ FMT
Optional based on hole conditions.
11. Plug back the pilot hole to 9600' MD. Spot balanced cement
plug across reservoir. Spot 50 high vis pill and kickoff
plug.WOC 12 hours.
12. Directionally drill intermediate hole to 10,076
TVD. 11,578'MD Well site geologist will help pick final target
TVD based on pilot hole results.
13. Run 7-5/8" production casing and cement.
14. Run bond logs on wire as deep as possible.
15. PU 6-3/4" BHA and drill 10' outside 7-5/8" casing. Change
over mud system to Xanvis. Directionally drill horizontal
section to 12364'.
16. Optional based on hole conditions. Make hole opener run
with 7-5/8" casing scraper spaced out to the packer setting
depth approximately.
17. Run 4-1/2" L-80 slotted/solid liner with liner top packer at
10,900'. Lotate XN nipple at 45 degrees and liner top packer
set in no greater tha 6/100 dog leg. Release from the packer
and displace Xanvis mud to filtered seawater. Spot lithium
hypochloride breaker across the liner.
18. Pull bowl protector. Run 4-1/2" L-80 completion with SBR.
Establish space out. Reverse in inhibited brine. Spaceout and
land the robing.2' from fully inserted.
19. Set BPV.ND Bop's. NU tree. Replace BPV with TWC and test
4-1/16" 5M# tree. Test packer.
20. Freeze protect robing.
21. RD MO Rig.
Distance to nearest well 1-61/Q-20 andl-57/R-23 ten ft
Max surface pressure 4254 psi based on @ 5230 psig at 9761
(TVD).
1-59 / 0-24 Hazards
Pressure: Abnormally high pressures may be encountered in the 3C/3B due to gas
injection approximately 1500' downdip of the target location at well 1-15/P-25. Estimated
sandface pressure based on average 1995 wellhead injection pressure is shown below.
Zone Pressure (psig) Depth (TVDSS)
3C Truncated
3B 5230 9705
3A 4640 9845
2B 4638 9955
2A 4346 10140
1 4989 10315
Note: These pressures are estimates, based on zonal
pressure surveillance in surrounding wells. Original
reservoir pressure (4890 psia @ 10000 TVDSS) may
be encountered at any point within the Kekiktuk, due to
hydraulic discontinuities within the formation.
· Faults:
Datum: Top K2M
Fault Distance
Throw/Direction
from target
SE fault 1 400 ft from ESL 50 ft DTSE
NW fault 350 ft from BSL 20 ft DTNW
SW fault 150 ft from BSL <20 ft DTNE
SE fault 2 HAW wellbore <20 ft DTNW
(approx 200 ft from ESL)
· Structure:
· 2B thickness uncertainty is -5/+25 ft due to offsets (143 ft in
5-02/SD-10;115 ft in 1-41/O-23)
· Horizontal target depth is '1/3 of GLOC thickness above expected
current 2B OWC (greater offset from GOC' due to higher mobility
of gas vs. water).
· Approx. 10 ft gas underrun is expect at top 2B if top 2B
is below expected regional moved GOC of 9955 ft ss.
· Small (<20' throw) fault expected in HAW path (see below)
· Maintain offset from faults to NW and SE of planned HAW section.
(see fault "fault/anomaly control"
below)
· Horizontal target location/depth contingent on pilot hole results.
· Gas: Moved GOC is expected in the uppermost
2B.
Cementing: Good show cement job is critical
Evaluate ECP set across 3A1 to provide gas
isolation.
· Mud:
Equivalent mud wt. in the pilot hole across 3B of 10.5 lb/gal, possible.
FIo-Pro across 6 3/4" horizontal hole.
Pilot Hole Abandonment Plug
Well 1-59/O-24
RIH to TD of pilot hole 12146 MD. with 5 drillpipe and 3.5 drillpipe
stinger open ended DP. Circulate.
RU Halliburton. Lay 133 bbl of balanced plugs across the reservoir.
Volume based on bringing cement top 300' above reservoir and
10% excess over gauge hole.
G Cement +.2%Halad 344+.2% CFR-2
15.8 ppg
1.15 Yield
TT 3 Hours
POH to 10700' leaving mud of drilling weight or greater between
plugs. Spot 50 bbl high vis pill of weight equal to or greater than
mud weight..POH to 10,200 circulate and lay cement plugs kick off
plug..
RU Halliburton. Lay 50 bbl balanced plug.
Volume based on placing cement to 100' above KOP of(9600') +
30% excess
G Cement .6% CFR-3,.25% LAP
17 ppg
.99 Yield
TT 2:45 hours
POH Wait on cement a minimum of 12 hours but no more than
16. IF its not hard in 16 hours it never will be.
1-59/O-24 Cementing Summary
1-59/O-24 CEMENT PROGRAM- HALLIBURTON
10-3/4" SURFACE CASING
CASING SIZE: 10-3/4", 45.5#
CIRC. TEMP: 40°F
LEAD CEMENT TYPE: Type 'E' Permafrost ADDITIVES: retarder
WEIGHT: 12.0 ppg YIELD: 2.17 ft/sx MIX WATER: 11.63 gps
APPROX. SACKS: 770 THICKENING TIME: 5+ hrs
TAIL CEMENT TYPE: Premium
ADDITIVES: 2% Calcium Chloride
WEIGHT: 15.8 ppg YIELD: 1.15 ft3/sx MIX WATER: 5.00 gps
APPROX. SACKS: 493 THICKENING TIME: 4 hrs
TOP JOB CEMENT TYPE: Type 'E' Permafrost
ADDITIVES: retarder
WEIGHT: 12.0 ppg YIELD: 2.17 ft3/sx
APPROX. SACKS: 150
MIX WATER: 11.63 gps
SPACER: 100 bbls fresh water ahead of lead slurry. The mixing temperature should be as cold as
possible to prevent acceleration-approximately 40 - 45 F.
CEMENT VOLUME
The objective is to get cement back to surface
1. Lead slurry w/30% excess over gauge hole.
2. TaLl slurry to 4401' w/30% excess over guage hole. 4401' MD = top of SV shale
2. Top job volume 150 sx.
9-7/8 Pilot Hole Abandonment
CEMENT TYPE: Premium
ADDITIVES: .2% Halad 344,.2% CFR-2
WEIGHT: 15.8 ppg YIELD: 1.15 ft3/sx
APPROX. SACKS: 644 THICKENING TIME: 3hrs
CEMENT VOLUME
Volume based on placing cement to 300' above the top of the Kekektuk with 10% excess.
MIX WATER: 5.00 gps
9-7/8" Kick Off Plug
CEMENT TYPE: Premium
ADDITIVES: .6% CFR-3,.25% LAP
WEIGHT: 17ppg YIELD: .99ft3/sx
APPROX. SACKS: 210 THICKENING TIME: 2:45hrs
CEMENT VOLUME
Volume based on placing cement 100' above kickoff point of 9500' with 30% excess.
MIX WATER: 3.6gps
7 5/8" PRODUCTION CASING
CASING SIZE: 7-5/8", 29.7#
CIRC. TEMP 135°F
TAIL CEMENT TYPE: Premium
ADDITIVES: 0.2% CFR-3 (Dispersant) + 0.45% Halad-344 (Fluid Loss) + HR-5 (Retarder)
WEIGHT: 15.8 ppg YIELD: 1.15 ft3/sx MIX WATER: 5.0 gps
SACKS: 310 PUMP TIME: 4 hrs
Retarder (HR-5) concentration will be based on actual lab tests.
Note: Cement to be mixed on fly the last 2/3 to have .8# of Super CBL per sack added and
increase density from 15.8 to 16.1 to 16.4 in equal volumes, ppg. (1.05 cu-ft/sx) Have
Halliburton record density on chart recorder.
SPACERS: Pump 20 bbls Fresh Water; 70 bbls NSC! (Halliburton) spacer @ 11 ppg.
OTHER CONSIDERATIONS: Displace at 14 bpm with rig pumps.
CEMENT VOLUME: Tail Slurry to 1000' above the Kekektuk w/30% excess over gauge hole +
80 ft. shoe. The estimated MD of the Kekektuk is 10611'
Feb-07-96 05:15 Anac 11 DPC 90 )44 2160 P.08
I , SHAREB SERVZCES BRZL,L,I,,NG, I
59/0-24 (PH) (Pi ~)
I
I,i VERTICAL SECTION VIEW
.... l --- { Section at: ~15.83
j TVD Sca3e · ~ ~nch : 1200 feet
....~ Dep Scale' ~ inch = ~200 feet
I + Drawn .... · 02/07/96
'~ ~ ....................
............. t .............. m ...... ~nadrJ ]] Schlumberger
I Narker Identif icat~on MD BKB SECTN INCLN
~ Al TIE-IN SURVEY 4435 4158 1354 28.92
~ B) t0-3/4' CSG PI 4752 4435 ~507 28.92
~~ , C) CURVE 3/100 4752 4435 1507 28.92
~ ...................... , -- D) END 3/~00 CURVE 4779 4459 ~520 28.36
m El CURVE 3/100 6263 5770 2215 27.96
.~_~ ~3~ .... F} END 3/~00 CURVE 6455 5937 2308 30.40
6) CURVE 3/~00 9700 8736 3934 30.40
~ 6 .... ~ ....... H) END 3/100 CURVE ~0538 9348 ~ag6 54.98
'~~-~-- --- I) TARGET (PILOT HOLE) 11807 10076 5535 54.98
~ ~,m ~ ~ - ~,~- - - -A~ . . - ........
I-
~'~ ~ ?~ ................,
~ ~¢ ~ ~ -4~T1 ....
i
} ............ I .... '"' ....... ~ ...... · .......... ~'2.. _2~ .... 2'. ..' ....
) ~ ~ · . ,..
N()T :.--~ , - ~ .-~
~..
..... · - ~'.:.'~L~ i J ~ , .....
']~-~sr ~ ~ -~ ............ ~ ......
' !
I
~_ ~:~ ~~ .................... , .... ...~ ...... i.........
~_ ~-~ % ~o~r¢ ~¢ .....................
, ;-, ~:-:;: ~.~'.
i
- ~ ~ - - _ ~ .......... ...........
/
mmm mmIi IImmmmmmmm mmmlI Immmmmmmmi imImm mmImm m.
..... .... ..... - .......
0 600 1200 ~800 2400 3000 3600 4200 4800 5400 6000 6600 7200 7800
Sect ion qeparture
(/,r, acri]] (c)96 024PHPIi -_".54D.03 2:55 A.~(P)
SRARED ' 'ERVTCES
IIIII I I i i I I I!
Marker Identification MD BKB SECTN INCLN
A) END 3/100 CURVE 10538 9348 4496 54.98
8) TARGET (PILOT HOLE) t1807 10076 5535 54.98
C) TD 12t46 1027! 5813 54.98
DRILLING
Anadr J ] ] Schlumberger
'1-59/0-24 (PH)
('p11)
VERTICAL SECTION VIEW
11 I mi i ii --
Section at: 115 83
I ' I ~ ~ia];~; 1 inch : 200 feet
' Dep Scale.: 1 inch = 200 feet
) --, ..... · ............. Drawn '02/07/96
'T~P")~' "~"~¢ ........................... ' ....
;
. ,' ...... ' ' "~. ' "C, I'i'~ I
'/ ~ ~ .... '"') ~ I
, ~*~ ~ ~*~'~"'' ................ ' ................. ~- ' 'f "~'L./" ',,'"'~ :~ ~ ..
,
I
'T~ ~'- ~6- -' ' ..... ' --~'
r : -'~---, .... ~[? ...........
m I . I I ! m . m -- I I I ~ I i i ! m I I i i I I i i
. .._ ........ :.._.. .....
-~s:~-,~,- - ~ ................ : ...... I
I ·
I I
4200: 4300 4400 4500 46'00 4700 4800 4900 5000 5100 5;~00 5300 5400 5500 5600 5700 5800 5900 6000
Sect ion Departure '
(Ana~l] (C)96 024PhPI] 2.5b.03 2:.~. AN P)
ql
0
O
N
0
m
~-59/0-24 (PH) (P~)
PLAN VIEW
CLOSURE ..... : 58~5 feet at Azimuth ~7.50
S~iARED 'SERVICES DR
400 0 400 800 1200 1600 2000 2400: 2BO0 3200 3600 4000
<- WEST' EAST ->
i i i immll iii i
i
(~nadr~]l 1c196 024P~11 2.5b.03 2:52 ~ P)
.............. t ~ ' i I DECLINATION. +2g.o0~ (E)
, i SCALE · 1 inch = 800 feet
KB
, RAWN ' 02/07/96
~ ,
i_ ._ i ..... , .... Marker Identification MD N/S E/W
i~ A.I TIE-IN SURVEY 4435 545 1240
,o, 10-3/4' CSG PT 4752 600 1383
I i C) CURVE 3/!00 4752 600 1383
) ~.- ~- D) END 3/100 CURVE 4779 605 ~395
:/~ ~ ~U,VE~/,oo ~7oo ,~ ~o
.......................... ~ ...... I) IA"GEl (PILOT HOLE) "807 2564
,'
~1 I-''
.................. '-~ '-. i ......
. ~: ...... ~~~, ,
, : .............
....,~._~ .............. I ....
.' .7..,, j.~ x .~ ....
~' '-'"-'"' :~ .... .~..~ .,L. ''~ R ~ ,-
, I
0
I
0
O
Feb-07-96 05:22 Anad~,' 'i1 DPC 907 14 2160 P. 17
I~VD Scale:. 1 inch-- 12__0_0 !eet
, IDe~ Scale.: 1 i. nch. --_ 1200 feet
t ............. ! ] :' Anadri l i 5ch lumberger
i :'- MarKer I~lentification MD BKB SECTN INCLN
I Al TIE-IN DRILL TANGENI 9700 8736 3914 30.40
, B) CURVE ,2/,00 10976 9B37 4545 30.40
...... - { C) 7' LINERPOINT 11478 10076 4960 §0,00
G) ID (ESL] 12364 10076 5846 90.00
.... ,
x:---I
~ ~'~.----~ 1~7..- ....... ~ .....
-,~,-~,,~",,, .... ',---I ............... '"-----I-----''''---'--~' .... - .........
I
~E ~ ¢~ -4~3T ........ ~-- '~ .
: . .
% i .... ' .......... -~ -
~ ~ '~ .- / .. . .
,
~ ~ :'['- - .... . ;. ~ · . ,
.
~ -. -'
.... E ...................... ~ ~ . ~'' .~;-.~ . f-. - . .... ..: ) "~
k ~.., ',~
~~ I .
' ~ :- -i ...... - , . .. I
1
....... ~ '~ ................~
,'l~-~s~ U-8~I ............ · * ........................
.
: ~ ~ "
t ,
j ',
, + ......
~_~ .... .......... ........... .....
· ~ 1 ~~ .
~~ ~~ ........ , ............ ~ .
~ ....... ~...~ .............
~~~m;~ ~ -~-4 .......... ~ ...................... ~m .... ~'~
~.~.~~_-~, .... .......... , ........... .:~ :
~ ~ m---: = ~-:::~::::::FFF~:~~ ~
'~N~ ~P ~ ~ ..... ~ :::': :~:= :-~-
'~ F - ~331~ ............ ~ ...................... I ............. · .............
,
i
-__
[AnaO~'iil (c19~ 024H~11-~.~.04 3:61 A-H P)
0 600 ~200 1800 2400 3000- 3600 4200- 4800 5400 6000 6600'- 7200 7800
Sect ion ,.Seoar ture
t: ,~ i r .rill
I ,m
SHARED' S'ERVTCES DRTLLTNG
iii i ii ii iiii iiiii i
/Inadr~ ]] Sch]u~Oenger
$-59/0-24 (HA SEC) (P~.
VERTICAL SECT I ON VIEW
i ii iii i n
Section at: ll].79
J-- A '' il TVD Sca] I inch = 300 feet
) ............ [, . ': ~' "':" "~", i'. Oep Scale.:. ] inch 300 feet
~' : ':-- ' '~ .I " ' '
'T~'~L~ O~OFrS-' ~_ i .... ' ¢ .......... ~._..¢.~.j Drawn .... 02/07/96
) ' ' ,; ~ N .,
- ~', .... . .. Marker Identification MD BKB SECTN INCl
.......
B] CURVE i~/lO0 IOgTB g837 ~545 30.~
.................. C} 7" LINER POINT ~47B ~0076 4950 90,~
}-
"~ I D) END ]2/100 CURVE ~1476 10076 ~960 90.C
i ', ~ i E) TARGET (BSL) ~1576 10076 5060 90.~
" ~ ~ F) 4-J/2" LINER POINT ~2364 ~0076 5846 90 C
~' ~~'- ' .
) ..... , -- ,, ,, GlTO (ESL) ~2364 10076 5846 90.~
i
I- - , ' ' ~ ,'~ ; ·
~~t~ ~[---; ......... : -- '*--
~- - , ...........
· ~X '-~
.
_ ~~ ...... _. · ........... . .... , :~ . .
~_~_~ ......... ~ .... ~ .... .:~......: ....... ~ .---~ ~,,,., .. ~... ~-~:~
:~: ?~'}~?~.::~?~' ~::~.~' ~" ........ F" ~ ...... ~ ......
',~:~r m' m~r - ~ '::'~'i'''~:..'~':'' ' ! -~ ..... ~ .....
3600 3750 3900 4050 4200 4350 4500 4650 4800 4950 5100 5250 5400 5550 5700 5850 6000 6150 6300
Section Departure
[~na~r~]l (cl~ 02~Pll 2.~.0~ 3:02 ~ P)
~3
01
0
01
It
i i i
Anadri ] ] Sch]umberger
1-59/0-24 (HA SEC) (Pl~)
PLAN VIEW
CLOSURE · 5875 feet at Azimuth 1~7.46
........................ ~ IDECLINATION.: +29.00~ (E)
. : : ISCALE ....... : 1 inch = BO0 feet
''"~-,KB Ii .._. il .... -- IDRAHN ....... : 02/07/96
' i i
~ .-- i .... M~'rker Identification MD N/S E/W
............. ~ ........ I i 1) TIE-IN DRILL TANGENT 9700 1839 3480
~ ; I
.. ~ ~ ~) cu,v~ ~/~oo ~o~ ~ ~o~
''' ' ~I 7" LINER POINT 11478 2380 4390
',_.. END 12/100 CU"VE 1t478 2380 4390
'-' ~ ~I TARGET (BSL) 11578 2417 4483
- 4-~/2" LINER POINT 12364 2709 5213
''. O) TD (ESL) $23§4 2709 §2~3
·
.........
·
·
·
'i' . .,
i '
: · ,
~ .
.... i i .......... i ~
,
.. .-- .
........... ''~-J'~ i ~ ~ "~-'
.~ .
I
; : ·
I ''
I
J annn ~nn ~ann ~nno 6400 680
400 0 400 BO0 1200 1600 2000 2400 2800 3200 3600 4000
<- WEST · EAST ->
i
(Anadr))l (c)~ 024H~Plt 2.5b.04 3:02 ~ P)
O~
0
FEB 01 '96 1£:57PM BP."' '~L~OR~TIOM
BP EXPLORATION
BP Exploration (Alaska) Inc.
PO Box 196612
Anchorage, Alaska 99519-6612
TELECOPY
COMMUNICATIONS CENTER
MESSAGE#
TO: Name:
Company:
Location:
Fax #
FROM: Name & Ext.:
Department:
Confirm #
~.~c~ -~) Mail Stop:
NOTES:
PAGES TO FOLLOW
(Do Not Include Cover Sheet)
SECURITY CLASSIFICATION
PRIVATE SECRET
CONFIDENTIAL
Telecopy #
Confirm #
For Communications Center Use Only
Time In
Time Sent
Time Confirmed
Confirmed By
Operator
CEMENT VOLUME.: Tail Slurry to 1000' above the Kekektuk w/30% excess over gauge hole + 80 ft. shoe. The
estimated MD of the Kekektuk is 10611'
DRILLING HAZARDS & RISKS
The driller should monitor the well carefully while drilling from 10,700' to 10,800'
due to the possibility of potential high pressure,
A leakoff of 13.9 ppg on 2-48/O-13,13.0 ppg on 1-0:3 / P-16 and 12,55 on 1-65/N-25 was achieved
Any leakoff less than 12 ppg must be reported to drilling superintendent prior to drilling ahead.
COMPLETIONS
Recent Lessons Learned
1-03/P-16
Had trouble landing plug in the XN nipple at 50 degrees in the liner top, Bell guide worked
good however. Therefore it is suggested that the liner top be pulled up to 45 degrees in the
future completion.
The plug was actually catching in the collar of a tubing joint above the XN nipple but it acted
like it was in the profile in that the they pulled against it. It the would have pumped it would
have probably gone in, Pumping was required to seat the standing valve,
1-65/N-25
Pumped until bumped on long string. Unable to get wireline tools to fall below 55
degrees. Suggestion to make conditioning run prior to Ioggs considering that we have to pick up
3.5" DP next. lnhanced mud conditioning properties now being requested (less progressive gels)
may also be benefitial.
Hazards and Contingencies
1-59 / O-24 Hazards
Pressure: Abnormally high pressures may be encountered in the 3C/3B due to gas injection approximately 1500'
downdip of the target location at well 1-15/P-25. The driller should monitor the well carefully while
drilling from 10,700' MD to 10,800'MD.
Zone Pressure.(psi~_~ Depth ~CI'VDSS)
3C Truncated
3B 5230 9705
2B 4638 9955
2A 4~ 101~0
1 ~89 10315
Note: These pressures are estimates, based on zonal
pressure surveillance in surrounding wells. Original
reservoir pressure (4890 psia @ 10000 TVDSS) may
be encountered at any point within the Kekiktuk, due
to hydraulio discontinuities within the formation.
1-59/O;24 Well Plan
Version
Page 7
Date 12/31/96
MEMORANDUM
State ot Alaska
Alaska Oil and Gas Conservation Commission
DaVid
TO: Johns_.~, DATE:
Chairman--~-~ :.
THRU: Blair Wondzeli, ~~ FILE NO:
P. I. Supervisor -z ~ ~,
FROM: Bobby Foster,~~ SUBJECT:
Petroleum Inspector
February 3, 1996
EKHIBCDD:doc
Diverter Test- Doyon 15
BPX- DIU - 1- 59 / 0-24
PTD # 96-0022
Endicott Field
Saturday, February 3, 1996: i traveled this date to BPX's DIU well 1- 59 / 0-24 and
inspected and function tested the diverter system.
As the attached AOGCC Diverter System Inspection Report shows the diverter
system was installed properly under the conditions the lines have to be installed to
insure as much safety as possible for everyone concerned. With the confines of the
well houses, flow lines, pipe supports, both on the pad and overhead, the system is
installed, in my opinion, the best way possible.
The rig was clean and all equipment seemed to be in good working order. The
location was clean and ali tools and equipment were stored propedy and there was
good access to ali areas of the rig.
While testing the accumulator ! noticed that all of the four way valves had been
repaired as i had requested on a previous inspection trip.
Summary:. I witnessed the satisfactory function test and inspected the installation
of the diverter installed on Doyon rig 15 drilling BPX' DIU 1- 59 / 0-24.
Attachment:: EKHIBCDD.XLS
STATE OF ALASKA
ALASKA ~.,,,_ AND GAS CONSERVATION COI~,,,.oSION
Diverter SYstems Inspection Report
Operation:
Drig Contractor: DOYON Rig No.
Operator: BPX- ENDICOTT Oper. Rep.:
Well Name: 1-59/0-24 Rig Rep.:
Location: Sec. 36 T 12 N R. 16 E
Date: 2/3/96
Development X. Exploratory:
15 PTD # 96-0022 Rig Ph. # 659-6510/11
JAMES CARLISE
JOHN WELCH
Merdian Umiat
MISC. INSPECTIONS:
Location Gen.: OK Well Sign: OK
Housekeeping: OK (Gen.) Drlg. Rig: OK
Reserve Pit,: N/A Flare PiL N/A
DIVERTER SYSTEM INSPECTION:
Diverter Size:
Divert Valve(s) Full Opening:
Valve(s) Auto & Simultaneous:
Vent Line(s) Size:
Vent Line(s) Length:
Line(s) Bifurcated:
Line(s) Down VVind:
Line(s) Anchored:
Turns Targeted / Long Radius:
2O
12
in.
192' / 90' ff.
Yes
Yes
NIA
ACCUMULATOR SYSTEM:
Systems Pressure:
Pressure After Closure:
200 psi Attained After Closure:
Systems Pressure Attained:
Nitrogen Bottles:
3000 psig
1750 psig
min. 31 sec.
2 min. 23 sec.
,4 @ 2200
MUD SYSTEM INSPECTION: Light Alarm
Tdp Tank: OK OK
Mud Pits: OK OK
Flow Monitor: OK OK
,
GAS DETECTORS: Light Alarm
Methane OK OK
Hydrogen Sulfide: OK OK
~ 192' of 12" Vent Line ~
12' Manual Knife ~.~----~J i~ , ~ 12 Ve~ [~e ~ ~ Overho~ F~wline
ManEoM
~" ~P 2K ~e~r ~ ~O MOTORS & P~S ~ 12" Hyd. O~ra~, Full O~ning Knee Valve
Non Compliance Items 0 Repair Items Within
Remarks:
Day (s) And contact the Inspector @ 659-3607
Distrtbutioll
orig. - Welt File
c - OpertRep
c - Data~
c - Trip Rpt File
c - inspector
AOGCC REP.:
OPERATOR REP.:
EKHIBCDD.XLS
BOBBY D. FOSTER
DVTRINSP.XLT (REV. 1/94)
ALASKA OIL AND GAS
CONSERVATION COMMISSION
TONY KNOWLES, GOVERNOR
3001 PORCUPINE DRIVE
ANCHORAGE, ALASKA 99501-3192
PHONE: (907) 279-1433
FAX: (907) 276-7542
January 31, 1996
Steve Shultz
Senior Drilling Engineer
BP Exploration (Alaska), Inc.
P O Box 196612
Anchorage, AK 99519-6612
Duck Island Unit 1-59/O-24
BP Exploration (Alaska), Inc.
Permit No: 96-022
Sur. Loc. 3083'NSL, 2202'WEL, Sec. 36, T12N, R16E, UM
Btmhole Loc. 1298'NSL, 3433'WEL, Sec. 31, T12N, R17E, UM
Dear Mr. Shultz:
Enclosed is the approved application for permit to drill the above referenced well.
The permit to drill does not exempt you from obtaining additional permits required by law from other
governmental agencies, and does not authorize conducting drilling operations until all other required
permitting determinations are made.
Blowout prevention equipment (BOPE) must be tested in accordance with 20 AAC 25.035. Sufficiem
notice (approximately 24 hours) of the BOPE test performed before drilling below the surface casing shoe
must be given so that a representative of the Commission may vatness the test. Notice may be given by
contacting the Commission petroleum field inspector on the North Slope pager at 659-3607.
Sincerely,
Tuck~ Babcock
Co~ssion~r
BY ORDER OF THE COMMISSION
rill/Enclosures
cci
Department of Fish & Game. Habitat Section w/o encl.
Department of Environmental Conservation w/o encl.
:.
...'
.
?
,:
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
PERMIT TO DRILL
20 AAC 25.005
la. Type of work Drill [] Redrilll-I lb. Type of well. Exploratoryl-I Stratigraphic Test [] Development Oil []
Re-Entry [] Deepen[] Service [] Development Gas [] Single Zone [] Multiple Zone []
2. Name of Operator 5. Datum Elevation (DF or KB) 10. Field and Pool
BP Exploration (Alaska) Inc BKB=56 feet Endicott Field/Endicott Pool
3. Address 6. Property Designation
P. O. Box 196612, Anchorage, Alaska 99519-6612 ~DL 312828
4. Location of well at surface 7. Unit or property Name 11. Type Bond(see 20 AAC 25.025)
3083' NSL, 2202' WEL, SEC. 36, T12N, R16E Duck Island Unit/Endicott
At top of productive interval 8. Well number Number
806' NSL, 2707' WEL, SEC. 31, T12N, R17E 1-59/0-24 '2S100302630-277
At total depth 9. Approximate spud date Amount
1298' NSL, 3433' WEL, SEC. 31, T12N, R17E 02/01/96 $200,000.00
12. Distance to nearest 13. Distance to nearest well 14. Number of acres in property15. Proposed depth (MD and TVD)
property line
ADL 047502 1298 feet No Close Approach feet 4300 11914'MD /10074'TVD feet
16. To be completed for deviated wells 17. Anticipated pressure (see 20 AAC 25.035 (e)(2))
Kickoff depth 300 feet Maximum hole angle 90 o Maximum surface 4254 psig At total depth (TVD) 9761'/5230 psig
18. Casing program Setting Depth
s~ze Specifications Top Bottom Quantity of cement
Hole Casing Weight Grade Coupling Length MD TVD MD TVD (include stage data)
30" Struct. Drive Pipe 90' Surface Surface 90' 90' Drive
13-1/2" 10-3/4" 45.5# L-80 Btc 5364' Surface Surface 4741' 4431' 770sxPF'E', 493sx'G', 150sxPF'E'
9-7/8" 7-5/8" 29.7# uss-95 Butt 11266' Surface Surface 11046' 10076' 645 sx Class 'G'
6-3/4" 4-1/2" 12. 6# L-80 1105 10700' 9956' 11805' 10076' Uncemented Slotted Liner
Slotted
19. To be completed for Redrill, Re-entry, and Deepen Operations.
Present well condition summary
Total depth: measured feet Plugs (measured)
true vertical feet
Effective depth: measured feet Junk (measured)
true vertical feet
Casing Length Size Cemented Measured depth True Vertical depth
Structural
Conductor ~'~ ~'"' ~, ~r'" ~ V
Surface
Intermediate
Production JAN 2.6 10J96
Liner
Perforation depth: measured Alaska Oil& (;as Cons. Commission
true vertical Anchorage
20. Attachments Filing fee [] Property plat [] BOP Sketch [] Diverter Sketch [] Drilling program[]
Drilling fluid program.E] Time,v-s,. ~/~,~lep~ plot [] Refraction analysis[] Seabed report[] 20 AAC 25.050 requirements[]
21. I hereby ce _ .~.at the f~,~bir~rue and correct to the best of my knowledge
Signed .~../r'--'~Y/-~'~-~L--~ ~/. ..q_..,,~)/,"U.~(/'\,\- Title SeniorDrillingEngineer Date //~'~/,~.~
k,,, X~ Commission Use Only
Permit_N. umber IAPI numbe-'~" IApprov,al dat~, See cover letter
~/e - O ol. ~ ]5 0- ~,l'~ - ,2. 2. ~ '-/5/ I //~::> //<~ (-¢'_ for other requirements
Conditions of approval Samples required [] Yes J~No Mud Icg required LIYes [] No
Hydrogen sulfide measures ,]:gl' Yes [] No Directional survey requ~rea IX1 Yes [] No
Flequired working pressure fo~l~l b~:~L~ b~;3M; ~5M; 1-110M; I-I15M;
Other:
by order of /_~//(,,////~
Approved by Tuckerman Babcock Commissioner me commission Date
Form 10-401 Rev. 12-1-85 Submit ir
Well Name: 1-59/O-24
Well Plan Summary
I Type of Well (producer or injector): I Producer
Surface Location: 3083 FSL 2202 FEL S36 T12N R16E UM
Target Location: 806FSL 2707FEL S31 T12N R17E UM
Bottom Hole Location: 1298 FSL 3433 FEL S31 T12N R 17E UM
Bottom Hole Location: 930 FSL 2888 FEL S31 T 12N R17E UM
] AFE Number: 1 727104 I
Estimated Start Date: 12-1-96
I Rig: I DOYON 15
I Operating days to complete: 133
IMD: I 11914 I ITVD: I10074 I
I Well Design (conventional, sHmhole, etc.):
I KBE: 56
I SLIMHOLE HORIZONTAL
Formation Markers Horizontal Well Bore:
Formation Tops TVD BKB MD Pilot MD
Horizontal
UPPER SV SHALE 3366 3532
BASE UPPER SV 3686 3896
TOP SV MARINE 4131 4401
SHALE
BASE SV 4246 4531
MARLINE SHALE ~._.~ ..
SV-5 4266 4554 IW~t- ~.~ I~' ! V r"LJ
BASE SV-5 4531 4855
TOP UGNU 5656 6132
TOP WEST SAK 6831 7388
TOP 7731 8332 ~dask ~ Oil a Gas Cons. Commissio~
SEABEE/AYLYAK Anch~a~e
TOP SHALE 8870 9527
WALL/TUFFS
HRZ 9401 10111 10084
BASE HRZ 9661 10441 10357
PUT RIVER
LCU top 9681 10468 10378
KEKIKTUK 3B 9691 10482 10388 5230 psi
3A 9901 10770 10623 4640 psi.
2B 10011 10921 10794 4638psi.
Well Plan Summary Page 1
2M 10141 11100 Abent in
horzintal
well
2A 10196 11175 absent in 4346 psi.
horizontal
well
1C 10346 4989 psi
Casing/Tubing Program:
Hole Size Csg/ Wt/Ft Grade Conn Length Top Btm
Tbg O.D. MDfrVD MDfrVD
13.5 10.75 45.5 L-80 BTC 5364 0 4741/4431
9.875 7.625 29.7 USS-95 Butt 11266 0 11046/10076
6.75 4.5 12.6 L-80 1105 10700/9956 11805/10076
Logging Program:
I Open Hole Logs:
I Cased Hole Logs:
DIL/MSFL/LDT/CNL/GR
FMT 10-15 points dependent on hole conditions
Horizontal Hole MWD,GR possible restivity
SBT / gyro Optional
Mud Program:
Alaska Oil & Gas Cons. Commission
I Special design c°nsiderati°ns I Refer t° attached change °ver pr°cudure t° dissp~ t° [Flo-Pro
Surface Mud Properties: I SPUD
Density Marsh Yield 10 sec 10 min pH Fluid
(PPG) Viscosity Point gel gel Loss
8.5 300 40-60 30-60 60-80 8.5-9.5 none- 10
to to to to to to to
9.5 100 20-40 15-20 20-30 8.5-9.5 none- 10
Intermediate Mud Properties: Subject to Pilot Hole Properties. The mud weight in the
change based on pilot hole drilling results, intermediate hole may vary based on the pilot
hole results.
Density Marsh Yield 10 sec 10 min pH Fluid
(PPG) Viscosity Point gel gel Loss
9.2-10.5 50-6- 20-30 12-15 25-30 9.5-10.0 <6
to to to to to to to
Lubtex as required.
Well Plan Summary Page 2
Production Mud Properties: Subject to ] FLO_PRO
change based onPilot hole drilling results
I
Density Marsh Yield 10 see 10 mtn LSRV Fluid
(PPG) Viscosity Point gel gel cps Loss
9.3 NA 40-45 18-23 24-29 + 50,000 +6
Clorided mg/liter _+ 40,000
K:N ratio >1
Well Control:
Well control equipment consisting of 5000 psi W.P. pipe rams, blind rams, and annular preventer
will be installed and is capable of handling maximum potential surface pressures.
Diverter, BOPE and drilling fluid system schematics on file with AOGCC.
Directional:
[KOP: 1300
IMaximum Hole Angle:
Close Approach Well:
52 in pilot hole and 90.0 in High angle hole ]
NONE
I
The above listed wells will be secured during the close approach.
Deep well intersections 5-02/SD-10.
Disposal:
Annular Injection:
The Doyon solids handling unit will be utilized for the entire well.
cannot be injected should be hauled to CC-2A.
Insure the Annular Injection Guidllines are followed. DO NOT EXCEED
35,000 bbls IN ANY ANNULUS. Maximum injection rate is 3 BPM and
maximum volume is 1,000 bbls in any 24 hr period. Maximum injection
pressure is 2000 psi. The following well(s) are approved for annular
injection:
tha~ ~ ~ l"' l V ~ D
All
other
cuttings
JAN 2 6 1996
Alaska 0il & Gas Cons. Commission
Anch~age
AREA WELL PREV VOL PERMITTED PERMITTED DATES
INJECTED VOL
(aBES) (aBES)
END - MPI 2-40/S-22 16242 25,000 1-1-95 to 12-05-96
9-16-95
END _ MPI 1-31/M-21 0 25,000 1-1-95 to 12-05-96
END-MPI 1-19/I-18 0 25,000 6-28-95 to 6-28-96
E N D- M PI 1-33/M-23 Suspended
END_MPI 1-03/P-16 0 25,000 9-21-95 to 9-21-96
END_MPI 2-48/O-13 0 25,000 10-19-95 to 10-19-
96
E N D_M PI 1-61/Q-20 0 25,000 1/1/95 to 12/05/96
END-MPI 1-59/0-24 0 25,000 SEE A-FI-ACHED PERMIT
Well Plan Summary Page 3
END-MPI 1-65/N-25 0 25,000 12-05-95 to 12-05-
96
END - MPI 1-23/O-15 20464 25,000 1-1-95 to12-05-96
3-31-95
Well Plan Summary Page 4
1-59/O-24
OPERATIONS SUMMARY:
Dig out cellar, Weld on landing ring. Ensure landing ring is the proper
height with Endicott Field personnel install diverter.
MIRU Doyon 15.
Hold pre spud meeting with crew.
1. Test diverter. Drill 13-1/2" surface hole. Use gyro for close
approach until magnetic interference is past. Check with
Anadrill & Gyrodata to insure they are following JORPS.
Drill hole to 4741' TVD.
2. Run 10-3/4" 45.5 ppf surface casing
3. Cement surface casing.
4. Perform top job, if necessary with 150 sx Type "E"
Permafrost cement.
5. ND diverter. NU Bop's & test.
6. Drill out shoe and perform LOT.
7. Directionally drill pilot hole to 11,237' MD. Well site
geologist will help pick final TD (175' below the base of the
horizontal target interval)..Have sample catchers and well
site geologist on site before drilling the Kekiktuk.
9. Use key seat wiper for Tuffs and HRZ
10. RU E/Line & run open hole logs ("Triple Combo" ).+ FMT
Optional based on hole conditions.
11. Plug back the pilot hole to 9500' MD. Spot balanced cement
plug across reservoir. Spot 50 high vis pill and kickoff
plug.WOC 12 hours.
12. Directionally drill intermediate hole to 10,076 TVD. Well
site geologist will help pick final target TVD based on pilot
hole results.
13. Run 7-5/8" production casing and cement.
14. Run bond logs on wire as deep as possible.
15. PU 6-3/4 "BHA and drill 10' outside 7-5/8" casing. Change
over mud system to Xanvis. Directionally drill horizontal
section to 11,914'.
16. Optional based on hole conditions. Make hole opener run
with 7-5/8" casing scraper spaced out to the packer setting
depth approximately.
17. Run 4-1/2" L-80 slotted/solid liner with liner top packer at
10,900'. Lotate XN nipple at 45 degrees and liner top packer
set in no greater tha 6/100 dog leg. Release from the packer
and displace Xanvis mud to filtered seawater. Spot lithium
hypochloride breaker across the liner.
JAN 26 1996
,flaska ~ & Gas Cons. Commission
Anchorage
18. Pull bowl protector. Run 4-1/2" L-80 completion with SBR.
Establish space out. Reverse in inhibited brine. Spaceout and
land the tubing.2' from fully inserted.
19. Set BPV.ND Bop's. NU tree. Replace BPV with TWC and test
4-1/16" 5M# tree. Test packer.
20. Freeze protect robing.
21. RD MO Rig.
Distance to nearest well 1-61/Q-20 andl-57/R-23 ten ft
Max surface pressure 4254 psi based on @ 5230 psig at 9761
(TVD).
dAbl P- 6 1996
Naska Oil & Gas Cons. Comnussion
Anchor~e
1-59 / 0-24 Hazards
Pressure: Abnormally high pressures may be encountered in the 3C/3B due to gas
injection approximately 1500' downdip of the target location at well 1-15/P-25. Estimated
sandface pressure based on average 1995 wellhead injection pressure is shown below.
Zone Pressure (psig) Depth (TVDSS)
3C Truncated
3B 5230 9705
3A 4640 9845
2B 4638 9955
2A 4346 1O14O
1 4989 10315
Note: These pressures are estimates, based on zonal
pressure surveillance in surrounding wells. Original
reservoir pressure (4890 psia @ 10000 TVDSS) may
be encountered at any point within the Kekiktuk, due to
hYdraulic discontinuities within the formation.
· Faults:
Datum: Top K2M
Fault Distance
Throw/Direction
from target
SE fault I 400 ft from ESL 50 ft DTSE
NW fault 350 ft from BSL 20 ft DTNW
SW fault 150 ft from BSL <20 ft DTNE
SE fault 2 HAW wellbore <20 ft DTNW
(approx 200 ft from ESL)
· Structure:
· 2B thickness uncertainty is -5/+25 ft due to offsets (143 ft in
5-02/SD-10;115 ft in 1-41/O-23)
· Horizontal target depth is '1/3 of GLOC thickness above expected
current 2B OWC (greater offset from GOC due to higher mobility
of gas vs. water).
· Approx. 10 ft gas underrun is expect at top 2B if top 2B
is below expected regional moved GOC of 9955 ft ss.
· Small (<20' throw) fault expected in HAW path (see below)
· Maintain offset from faults to NW and SE of planned HAW section.
(see fault "fault/anomaly control"
below)
· Horizontal target location/depth contingent on pilot hole results.
· Gas: Moved GOC is expected in the uppermost
2B.
Cementing: Good show cement job is critical
Evaluate ECP set across 3A1 to provide gas
isolation.
· Mud:
Equivalent mud wt. in the pilot hole across 3B of 10.5 lb/gal, possible.
FIo-Pro across 6 3/4" horizontal hole.
JAN 2 6 1996
Alaska 0il & Gas Cons. Commission
Anchorage
Pilot Hole Abandonment Plug
Well 1-59/O-24
RIH to TD of pilot hole 11,237 MD. with 5 drillpipe and 3.5 drillpipe
stinger open ended DP. Circulate.
RU Halliburton. Lay 132 bbl of balanced plugs across the reservoir.
Volume based on bringing cement top 500' above reservoir and
10% excess over gauge hole.
G Cement +.2%Halad 344+.2% CFR-2
15.8 ppg
1.15 Yield
TT 3 Hours
POH to 10200' leaving mud of drilling weight or greater between
plugs. Spot 50 bbl high vis pill of weight equal to or greater than
mud weight..POH to 9700 circulate and lay cement plugs kick off
plug..
RU Halliburton. Lay 50 bbl balanced plug.
Volume based on placing cement to 100' above KOP of(9600') +
30% excess
G Cement .6% CFR-3,.25% LAP
17 ppg
.99 Yield
TT 2:45 hours
POH Wait on cement a minimum of 12 hours but no more than
16. IF its not hard in 16 hours it never will be.
JAN 26 19~6
Naska Oil & Gas Cons. Commission
Anchorage
1-59/0-24 Cementing Summary
1-59/O-24 CEMENT PROGRAM- HALLIBURTON
10-3/4" SURFACE CASING
CASING SIZE: 10-3/4", 45.5#
CIRC. TEMP: 40°F
LEAD CEMENT TYPE: Type 'E' Permafrost ADDITIVES: retarder
WEIGHT: 12.0 ppg YIELD: 2.17 ft/sx MIX WATER: 11.63 gps
APPROX. SACKS: 770 THICKENING TIME: 5+ hfs
TAIL CEMENT TYPE: Premium
ADDITIVES: 2% Calcium Chloride
WEIGHT: 15.8 ppg YIELD: 1.15 ft3/sx MIX WATER: 5.00 gps
APPROX. SACKS: 493 THICKENING TIME: 4 hrs
TOP JOB CEMENT TYPE: Type 'E' Permafrost
ADDITIVES: retarder
WEIGHT: 12.0 ppg YIELD: 2.17 ft3/sx
APPROX. SACKS: 150
MIX WATER: 11.63 gps
SPACER: 100 bbls fresh water ahead of lead slurry. The mixing temperature should be as cold as
possible to prevent acceleration-approximately 40 - 45 F.
CEMENT VOLUME
The objective is to get cement back to surface
1. Lead slurry w/30% excess over gauge hole.
2. Tail slurry to 4401' w/30% excess over guage hole. 4401' MD = top of SV shale
2. Top job volume 150 sx.
9-7/8 Pilot Hole Abandonment
CEMENT TYPE: Premium
ADDITIVES: .2% Halad 344,.2% CFR-2
WEIGHT: 15.8 ppg YIELD: 1.15 ft3/sx
APPROX. SACKS: 644 THICKENING TIME: 3hrs
CEMENT VOLUME
Volume based on placing cement to 500' above the top of the Kekektuk with 10% excess.
MIX WATER: 5.00 gps
9-7/8" Kick Off Plug
CEMENT TYPE: Premium
ADDITIVES: .6% CFR-3,.25% LAP
WEIGHT: 17ppg YIELD: .99ft3/sx MIX WATER: 3.6gps
APPROX. SACKS: 210 THICKENING TIME: 2:45hfs
CEMENT VOLUME
Volume based on placing cement 100' above kickoff point of 9500' with 30% excess.
7 5/8" PRODUCTION CASING J~i"~'-~i~ ! V ~D
JAN 26
Alaska Qii & Gas Cons, Comrmsion
CASING SIZE: 7 -5/8", 29.7#
CIRC. TEMP 135°F
TAIL CEMENT TYPE: Premium
ADDITIVES: 0.2% CFR-3 (Dispersant) + 0.45% Halad-344 (Fluid Loss) + HR-5 (Retarder)
WEIGHT: 15.8 ppg YIELD: 1.15 ff3/sx MIX WATER: 5.0 gps
SACKS: 645 PUMP TIME: 4 hfs
Retarder (HR-5) concentration will be based on actual lab tests.
Note: Cement to be mixed on fly the last half to have .44t of Super CBL per sack added and
increase density to 16.1ppg. (1.05 cu-ft/sx) Have Halliburton record density on chart recorder.
SPACERS: Pump 50 bbls Fresh Water; 70 bbls NSCI (Halliburton) spacer @ 11 ppg.
OTHER CONSIDERATIONS: Displace at 14 bpm with rig pumps.
CEMENT VOLUME: Tail Slurry to 1000' above the Kekektuk w/50% excess over gauge hole +
80 ft. shoe. The estimated MD of the Kekektuk is 10611'
JAN 26 1996
Alaska Oil & Gas Cons. Commission
Anchorage
Jan-16-96 12:32 Ana ~11 DPC _ 9( 344 2160 P.05
[ ' " SH'A'REB SERVICES DRILLING
<~>o , , , , ~t-59/0-24 (PH) (P6)
~-- ! I I VERTICAL SECTION VIE~I
6o0 ....... [- ..................... Section at: ~122.29
:~-~ i ' IVD Scale.' 1 inch : 1200 feet
~2oo cD~ . Dep Scale.' ~ inch ~200
1800 .....................
[ ~ , ~nadri]] Schlumberger
.
Marker 'Identification MD BKB SECTN INCLN
2400 Al KB 0 0 0 O. O0
B) KOP BUILD ~.5/100 300 300 0 0.00
.......... O) END 2.5/t00 BUILD t200 ~lgo ~13 ~6.50
E) CURVE 2.5/100 2500 2436 4Bt ~6.50
........... - r~s~6/~ s, s~ ~ F) END 2.5/100 CURVE 2979 2879 661 28.26
G) 10-3/4" CS6 PT 474~ 4431 ~482 28.26
3600 ~¢ ~- ~'~ .... ~ H) CURVE 3/~00 6261 5770 218g 28.26
~ I) END 3/100 CURVE ~J5 5907 2258 25.44
i . d) CURVE 3/~00 9500 8693 3582 25.44
4200-~r~¢~m-~~¢-c-~.~- ....... K)' END 3/~00 CURVE ~ 10392 , 9382 4~36 52.17
~s~ ~'~$4¢ ....... ~ ..... L) fARGET (PILOT HOLE) ~~ 9986 4915 52.17
'e~sr ~¢¢ ~C '4~T ...... H) TD ] 1794 10241 5243 52. ~ 7
, - . ;.. -~.~:'-', ,..~.~_~: .
54O0-
,>-¢¢- ,~ ; - ~',[)";' .. -.,-., .... , -.
~--
I: ".' "
6600 ...... ; ..... ~ ........ "" ................... "' ~ ......
.
: .
8400
' i
i
~oo
o
9600 ' K
.... .................
0 600 1200 1800 2400 3000 3600 4200 4800 5400 6000 6600 7200 7800
Section Oeparture
,
Jan-16-96 12:33 An~ ill DPC 9 344 2160 P.06
SHARED SERV I cE'~ oBI LL I NG I
.... 1-59/0-24 (PH) (PC)
,VERTICAL SECTION VIEW
I '
7400 ....... ~ ............ i' - Section at: 122.29
. . TVD Scale.' 1 inch = 400 feet
; j Oep Scale.' ! inch : 400 feet
_-- --. ..... j J Anadrll]Soh]umberger,,
Napkep Identification MD BKB SECTN INCLN
i t) CURVE 3/~00 [t500. B6§3 3582 25.4,1
B) END 3/100 CURVE 10392 9382 4136. 52.17
[t200-'- i C} IARGET {PILOI HOLE) 11378 §§B6 491§ §2..~7
'X .......... ~ - - -- O) ID ~ "11794 10241 5243 52.17
B ..
· . ..... ,
K 8400 /' ". " ' '
:,~,:'7"':.' ..... ,.-' :
.:
........ - ................ _
I r' --~ - - ..,.. ,~ . j
.......... ... i. '- ..... '~' ~ ;'J.N I
~oo , , J ' '-': .,"-: .~. ..[~(~ c ~ -
i ,,,, .......... ~ ..........
"fl~'~u_-~'~.~t?fr~}'s-'~' ...................... - .......... J.
§000 .........................................
9200
:
§400- a~".~-
._-X,
I
'TGo"Z~" ~ - '9¢76' ~~ .................
,oooo ,: - ,,... :,- .......... -,
10200 '~l~r'~i_"_~7~ . ...........
~0400 I i
~0600 .............. :...........
i ·
~o~oo I i I
2800 3000 3200 3400 3600 3800 4000 4200 4400 4600 4800 5000 5200 5400 5600
Sect ion Oeparture
...... # .......... ! i i
(~nadrill (c]9~ 024l:q¢6 2.5~.04 2:55 PN PI
SHARED
SERVICES DRILLING
Anadr~ ]] S£h]umberger
·
1-59/0-24 (PH) (PC)
PLAN VIEW
i i ii ii ii i ·
CLOSURE
,CD ! J ~ ISCALE ....... : 1 inch : 600 feet
0 .... !,..,_, J i i i IDRAWN ....... : 0:1/:15/96
I
0-- : J ....... J Marker Identification MD N/S E/W
·~,,,,,~. -' -'- i J AJ KB 0 0 0
I ! I
'~ I B) KOP BUILD 1.5/100 300 0 0
0-- ~,,,,,6 J C) BUILD 2.5/100 900 22 42
i D) END 2.5/100 BUILD 1200 53 100
~ ~i ' E) CURVE 2.5/100 2500 226 426
! ~ F) END 2.5/100 CURVE 2979 30`1 592
G) '10-3/4" CSG PT 4741 6:1:1 '1367
0 j ~ .... i ..... H. ! H) CURVE 3/100 6261 679 2035
J} CURVE 3/100 9500 t57! 3245
, KJ END 3/100 CURVE 10392 1860 3718
t .
3-- . ~ L) TARGET (PILOT HOLE) !1378 2276 4376
I M) TD 11794 2451 4654
I '.
:
.
.....
... . ............. .. :T-;.---.:-.,.--., "l I ,
, ........ ' ,¢~., . . . .~ ''' :'"~:" .""= = ; .k. I' !i.,. r . '..,.,j : ' ' ' .%,,,,~ . i' --
' . ' , ' '':1 ...,. --./~,~ . j ~~..~
.... ' "" '..;"!!:CN . I '
i ] .:... I ,
.......... ,_:q' --: i .......................
i
! I ' ;
...............
I I i. ~ I i j ~ ....
J ~
,
5260 feet at Azimuth ~17.78
300 0 300 600 900 t200 ~500 1800 2100 2400 2700 3000 3300 3600 3900 4200 4500 4800 5i00
<- NEST' EAST ->
(maOr~l] (c)g6 024PHP6 2.51~.03 2:.50 PH P)
' '" iii ill ii i iii iii ii i i i ~
Jan-16-96 12:38 Ana~ ,11 DPC 90 ~44 2160 P.13
I ..... " SHAI:qED SERVICES' Q.F::IILLING
~ VEF:ITICAL SECTION VIEW
Section at' 123.813
', IVD Scale.' 1 inch = 1200 feet
', I Oep Scale' 1 ~nch = 1200 feet
' ~ Drawn ..... · 0:1/15/96
', : Anadri ]] Schlumberger
} ~ · Marker Identification MD BKB SECTN INCLN
~' A) TIE-IN 9500 8693 3570 25.44
'; B) CURVE 12/100 1072B BSOI 4096 25.44
~ . C} 7' LINEfl POINT I~266 ~007~ ~528 go.o0
I .......... · - ~ D) END t2/100 CURVE 11266 10074 4528 90.00
~ , ' El TARGET (BSL) 11366 ~0074 4628 90.00
~~gC~''~*, Fl ID (ESL) 11g~4 10074 5176 90.00
.
~ ·
:~800 2400 3000 3600 4200 4800 5400 6000 6600 7200 7800
Section Departure
(~adril] (c)96 024HAWP6 2.5t~.03 3:55 PN p}
Jan-16-96
/
12:39 An ril 1 DPC _r 344 2160
P.14
SHARkD SER~ICES DRILLING
,o-- ',,,[ ' , 1-59/0-24 (HA.. SEC) (P6)
· ,, [ VERTICAL SECTION VIEW
~o~ .... ~, ......~ ,..
', SectiOn at' 123.88'
,, TVD Scale.' ~ inch : 300 feet
,o-- ~ Dep Scale · ! inch = 300 feet
', Drawn · 01/15/96
} ! .... _
~ ~ , -X-nadri]] Schlumberger
0 .......... , "~' f~ ¢~"~r~ ~r~ ' m"mill ' ~' i c]B)A)Marker CURVE 7' fIE-IN LINER Identification t2/100 POINI ~6~10729 9500 MD 10074 .9693 9801 BK8 SECTN 4529.4096 3570 90.00 25.44 25.44 INCLN
0 ....... ~ i .... ; D} END 12/100 CURVE 1t26G 10074 -4529 90.00
, E] TARGET (BSL} t1366 10074 4629 90.00
.............. ................. .
I
~ ~:~:::~::::: ,.:: :.f, - :~-~.~A~-.2~ I'~G-- ~.-
'-. ~ ~ ~1 & Gas ~ns. ~mi~bn
.................~'~ -
), ,~_~~ .... ~'i~ .... ~,.~ ................ ~._
-
~.E,I ~ , J
.....
I
~ ~ ........ -~ ..... ~ _. _
DO 3450 3600 3750 3900 4050 4200 4350 4500 4~0 4800 ~gso 5100 5250 5400
Sect-on Departure
33OO
(./m a dr i ! !
260(
3000
SHARED SERVICES
DRILLIN8
i _, i
Anad/"i ] ] $chlu~berge/'
~-59/0-24 [HA SEC)
(PC)
~ "' -" ' i ........... ¢ ' 'j DRAWN ....... : 0~/15/96
~", i ,'~- =- ~ '
1-- ! ~ ~ Marker Identification MD N/S E/W
~ .~ ~ ~ ~ A) TIE?IN 9500
.' O [ B) CURVE 12/100. ,07~8 ,834 3702
....... '~ D) END, t8/100 CURVE 1~866 2067 4065
Fl ~TO (ESL) 11914 2429 4603
,~ ' . '
..... ,. . ..... ~".
' ,,,
., .
400- -~ .,
500-
600- -
PLAN VIEW
i i
¢ ICLOSURE · 5205 feet at Azimuth ll7.SJ
3200 3200 3300 3400 3500 3600 3700 3800 3900, 4000 4500 4200 4300 4400 4500 4600 4700 4800
EAST ->
i iii ii i im i ii i m i i ii i
~m;~d~i]] ['c)9§ 024HAI~P6 2.5b.03 ~:5'5 PN P}
CONSERVATION COM~HSSION ·
!
TONY KNOWLE$, GOVERNOR
3001 PORCUPINE DRIVE
ANCHORAGE, ALASKA 99501-3192
PHONE: (907) 279-1433
FAX: (907) 276-7542
December 28, 1995
ADMINISTRATIVE APPROVAL NO. 202.37
Re: Spacing exception for Endicott 1-59/0-24 well
Mr. Robert R. Metzger
Area Production Engineer
BP Exploration (Alaska) Inc.
P. O. Box 196612
Anchorage, AK 99519-6612
Dear Mr. Metzger:
We have received your correspondence dated December 18, 1995 requesting a spacing
variance for the Endicott 1-59/0-24 well.- As proposed, this well will penetrate the top of
the 2B interval of the Kekiktuk Formation within 175 feet of the 5-02/SD-10 well. Well
5-02/SD- 10 is a water injection well completed in the Zone 2A interval of the Kekiktuk
Formation. The subject well will be drilled as a horizontal producer in the 2B interval.
The drilling and co/npletion of the 1-59/0-24 2B zone production well will not interfere
with 2A zone injection operations in the adjacent 5-02/SD-10 well.
The Commission has determined placement of the well will not promote waste, will
enhance recovery, and hereby approves the drilling of the Endicott 1-59/O-24 well as
proposed pursuant to Rule 3 of Conservation Order No. 202.
Sincerely,
J. David Norton, P.E.
Commissioner
BY ORDER OF THE COMMISSION
WELL NAME
2tached ...................
appropriate ...............
lame and number ...............
in a defined pool .............
proper distance from drlg unit boundary.
proper distance from other wells .....
~reage available in drilling unit .....
is wellbore plat included ........
! affected party .............
appropriate bond in force ........
~ issued without conservation order ....
~ issued without administrative approval.
approved before 15-day wait .......
ring provided ............... .~ N
ng protects all known USDWs ........ .~ N
uate to circulate on conductor & surf cng. N
uate to tie-in long string to surf cng . . . Y ~
er all known productive horizons ....... Y
ns adequate for C, T, B & permafrost .... ~ N
~age or reserve pit ............. ~ N
1, has a 10-403 for abndrnnnt been approved. ~
lbore separation proposed ......... .~ N
required, is it adequate .......... .~ N
id program schematic & equip list adequate N
te ..................... ~ N
ating adequate; test to ,~~) psig.~ N
id complies w/API RP-53 (May 84) ...... ~
cur without operation shutdown ....... .~ N
of H2S gas probable ............ ~ N
~e issued w/o hydrogen sulfide measures .... Y
ed on potential overpressure zones ..... Y
ysis of shallow gas zones .......... yN
tion survey (if off-shore) ........ ~/~ N
Iphone for weekly progress reports . . . /. Y N [exploratory only]
ENGINEERING:
COMMISSION:
DWJ
JDN
Comments/Instructions:
O
m
WELL PERMIT CHECKLIST
PROGRAM: exp [] der ~. redrll [] aery [] wellbo:
ADMINISTRATION
1. Permit fee attached ...................
2. Lease number appropriate ................
3. Unique well name and number ...............
4. Well located in a defined pool .............
5. Well located proper distance from drlg unit boundary.
6. Well located proper distance from other wells ......
7. Sufficient acreage available in drilling unit ......
8. If deviated, is wellbore plat included .........
9. Operator only affected party ..............
10. Operator has appropriate bond in force .........
11. Permit can be issued without conservation order .....
12. Permit can be issued Without administrative approval.
13. Can permit be approved before 15-day wait ........
REMARKS
'ENGINEERING
14. Conductor string provided ............... ~N
15. Surface casing protects all known USDWs ........ Y~ N
16. CMT vol adequate to circulate on conductor & surf csg..~Y~ ~
17. CMT vol adequate to tie-in long string to surf csg . . . Y ~
18. CMT will cover all known productive horizons ....... ~ ~
19. Casing designs adequate for C, T, B & permafrost .... Y~ N
20. Adequate tankage or reserve pit ............ ~ N
21. If a re-drill, has a 10-403 for abndnmnt been approved..~-----N---
22. Adequate wellbore separation proposed ......... .~Y~ N
23. If diverter required, is it adequate .......... ~ N
24. Drilling fluid program schematic & equip list adequate ~ N
25. BOPEs adequate .................... ~/ N
26. BOPE press rating adequate; test to ~~ psig.~ N
27. Choke manifold complies w/API RP-53 (May 84) ....... Y .... N-}~~
28. Work will occur without operation shutdown ...... N
29. Is presence of H2S gas probable ........... N
GEOLOGY
DATE
/
30. Permit can be issued w/o hydrogen sulfide measures .... Y ~
31. Data presented on potential overpressure zones ..... Y /N
F
32. Seismic analysis of shallow gas zones .......... y N
33. Seabed condition survey (if off-shore) ........ ~ N
34. Contact name/phone for weekly progress reports . . . J. Y N
[exploratory only]
GEOLOGY:
ENGINEERING: COMMISSION:
Comments/Instructions:
i~1[~_ heklist rev 11/95
Well History File
APPENDIX
Information of detailed nature that is not
particularly germane to the Well Permitting Process
but is part of the history file.
To improve the readability of the Well History file and to
simplify finding information, information of this
nature is accumulated at the end of the file under APPENDIX.
No special effort has been made to chronologically
organize this category of information.
~'Z
I
Tape Subf. ile 2 is t~ : LIS
TAPE HEADER
ENDICOTT UNIT
OPEN HOLE WIRELINE LOGS
WELL NAME:
API NUMBER:
OPERATOR:
LOGGING COMPANY:
TAPE CREATION DATE:
JOB DATA
JOB NUMBER:
LOGGING ENGINEER:
OPERATOR WITNESS:
SURFACE LOCATION
SECTION:
TOWNSHIP:
RANGE:
FNL:
FSL:
FEL:
FWL:
ELEVATION (FT FROM MSL 0)
KELLY BUSHING:
~DERRICK FLOOR:
GROUND LEVEL:
WELL CASING RECORD
RUN 1
6601.00
R. ECK
SEE REMARKS'~
1-59/0-24 PH
500292264480
BP EXPLORATION (ALASKA) INC.
WESTERN ATLAS LOGGING SERVICES
22-FEB-96
RUN 2 RUN 3
36
12N
16E
3083
2202
56.00
56.00
15.00
OPEN HOLE CASING DRILLERS
BIT SIZE (IN) SIZE (IN) DEPTH (FT)
1ST STRING
2ND STRING
3RD STRING 13.500 10.750 4741.0
PRODUCTION STRING 9.875 12090.0
REMARKS: DIFL/ZDL/CN/GR.
CIRCULATION STOPPED AT 0900, 17-FEB-96.
LOGS WITNESSED BY: P. BARKER & E. VAUGHN.
TOOL STRING WAS DRILLPIPE CONVEYED.
TD WAS NOT TAGGED.
AFTER LOG VERIFICATIONS NOT AVAILABLE FOR CALIPER DUE
TO PCL OPERATION.
PER CLIENT'S REQUEST, BOREHOLE & TORNADO CHART CORREC-
TIONS WERE APPLIED TO THE DIL DATA. THE DIL DATA WAS
CALIPER CORRECTED. THE CORRECTED DATA WAS THEN USED
IN THE ATLAS TORNADO CHART TO GET "RT" & "DI" CURVES.
RT = TRUE FORMATION RESISTIVITY.
DI = DEPTH OF INVASION.
NEUTRON LOG PARAMETERS:
SANDSTONE MATRIX,
CALIPER CORRECTED,
CASING CORRECTIONS OFF,
SALINITY = 0.0 PPM.
FILE HEADER
FILE NUMBER: 1
EDITED OPEN HOLE MAIN PASS
All tool strings;
hole data.
DEPTH~INCREMENT:
FILE SUMMARY
~BU TOOL CODE
GR
DIL
SDN
2446
$
depth shifted and clipped curves;
.5000
START DEPTH STOP DEPTH
10970.0 12003.0
11032.0 12063.0
11000.0 12027.0
11032.0 12009.0
GR
(MEASURED DEPTH)
BASELINE CURVE FOR SHIFTS:
CURVE SHIFT DATA
BASELINE DEPTH
11010.0
11044.5
11045.5
11047.5
11074.0
11078.5
11079.0
11104.5
11115.0
11125.0
11135.0
11142.5
11164.5
11165.0
11165.5
11168.5
11171.0
11171.5
11174.5
11176.0
17185.5
· 1186.5
11189.0
11189.5
11~191.5
11194.0
11194.5-
1t198.0~
11198.5
11204.0-
11208.0
11216.0
11227.5
11237.5
11240.5
11261.0
11273.0
11274.5
11275.5
11281.5
all runs merged; no case
......... EQUIVALENT UNSHIFTED DEPTH .........
LL8 ILD RHOB NPHI
11010.5
11046.0
11047.5
11078.5 11077.5 11078.5
11164.5
11104.0
11142.0
11043.0
11046.0
11073.0
11078.0
11135.5
11114.5
11124.0
11165.5 11164.5
11282.0
11273.0 11273.0
11276.0
11274.5
11238.0 11238.5
11241.0 11241.5
11261.0
'- 11198.0
.-. 11204.5
1121'6.0 11215.0 11216.0
11226.5
11189.5
11191.5
11194.0
11203.5
11208.0
11215.'5
11194.0
11198.0
11190.5
11188.5
11186.5
11189.5
-11187.0
-. -
11171.0 11171.5
11174 . 5 11174 . 0
11176.5
11185.5
11164.0
11167.5 11167.5 11168.5 11167.5
11171.0 11171.0
S'98EII
g · SI§II
0'68EII
S'£SEII
11531.5
11541.5
11544.0
11546.5
11556.0
11562 .O
11564.0
11566.5
11591.5
11609.5
11626.0
11628.0
11630.0
11631.0
11632.5
11649.5
11650.0
11650.5
11675.5
11680.0
11680.5
11683.0
11692.5
11693.5
11697.5
11698.0
11707.0
11709.5
11731.5
11732.0
11734.0
11737.0
11772.5
11781.0
11795.0
11795.5
11831.5
11833.5
11834.0
11835.5
11852.0
11862.5
11883.0
11921.5
11922.0
11931.0
11953.0
11964.0
11968.0
11969.5
11970.0
11970.5
11976.5
11979.0
11981.5
11984 · 0
11988.0
11989.5
. .
11991.5
11992.0
.o .
11540.5
11564.0
11567.0
116-28.5
11630.0
11631.5
11650.5
11680.5
11707.0
11732.0
11738.5
11794.5
11833.0
11922 · 0
11931.5
11964.0
11967.5
11970.5
11978.5
11982.0
11984.5
11987.5
11540.5
11554.5
11564.0
11567.0
11592.0
11628.0
11634.5
11650.5
11675.5
11680.5.
11707.0
11732.0
11738.5
11780.5
11794.5
-.
11833.0
11851.0
1186-1.0
11883.0
11921.5
11953.0
11964.0
11967.5
11970.0
11978.5
11981.5
11984.5
11990.0
11992.5
11541.5
11562.5
11564.5
11567.0
11631.0
11649.5
11694.5
11700.5
11707.5
11709.5
11731.0
11737 ..0
11795.0
11833.5
11883.0
11921.5
11964.5
11969.5
11974.5
11978.0
11992.0
11531.5
11541.0
11544.5
11546.0
11563.5
11610.0
11649.0
11680.5
11683.5
11692.0
11697.0
11731.5
11734.5
11773.0
11795.0
11831.0
11834.0
11883.0
11963.5
·
11981.5
11992.5'
12007.5
12 03'8.0
$
MERGED DATA SOURCE
PBU TOOL CODE
GR
DIL'
SDN
2446
REMARKS:
12006.0
12037.5
11992.0
RUN NO. PASS NO. MERGE TOP
I 3 10970.0
i 3 11032.0
i 3 11000.0
1 3 11032.0
MAIN PASS.
SP, MTEM, TEND & TENS WERE SHIFTED WITH LLS.
ILM, RT, & DI WERE SHIFTED WITH ILD.
DRHO, PEF, & CALl WERE SHIFTED WITH .RHOB.
FUCT & NUCT WERE SHIFTED WITH NPHI.
MERGE BASE
12003.0
12063.0
12027.0
12009.0
CN
WN
FN
COUN
STAT
/ ? ?MATCH1. OUT
/ ? ?MATCH2. OUT
/ ? ?MATCH3. OUT
/ ? ?MATCH4. OUT
$
: BP EXPLORATION (ALASKA)
: 1-59/O-24 PH
: ENDICOTT
: NORTH SLOPE
: ALASKA
* FORMAT RECORD (TYPE# 64 )
ONE DEPTH PER FRAME
Tape depth ID: F
17 Curves:
1
2
3
4
5
'6
7
8
9
10
11
12
13
14
15
16
Name Tool Code samples Units
GR DIL 68 i GAPI
LL8 DIL 68 i .OHMM
ILM DIL 68 i OHMM
ILD DIL 68 i OHMM
RT DIL 68 1
DI DIL 68 I IN
SP DIL 68 i MV
MTEM DIL 68 i DEGF
TEND DIL 68. i LB
TENS DIL 68 I LB
RHOB SDN 68' 1 G/C3
DRHO SDN 68 i G/C3
'PEF SDN 68 1 BN/E
CALl SDN 68 1 IN
NPHI 2446 68 1 PU-S
FUCT 2446 68 1 CPS
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
4 4 08 310 01 1
4 4 08 995 99 1
4 4 08 995 99 1
4 4 08 995 99 1
4 4 08 995 99 1
4 4 08 995 99 1
4 4 08 995 99 1
4 4 08 995 99
4 4 08 995 99 1
4 4 08 995 99 1
4 4 49 995 99 1
4 4 49 995 99 1
4 4 49 995 99 1
4 4 49 995 99 1
4 4 47 995 99 1
4 4 47 995 99 1
s~$Aq 9IOI
: q~Bu~I paooaa um~.xe~
:q3JSu~I paoosa
Z :aI~qns
sum~ep LBO0 t,
89 :~DoD d~H
:Aaemmns 6u~pooap apoo uo~e~uass~daa SIq
000000'9~60I = gsdaG puH aI~ ad~
000000'L90EI = q~dsG ~xe~S al!& adez
66
G66 t~
89
mmmmmmm
09I :spaooeH e~,e(] Ie~o.~.
Tape Subfile 3 is type: LIS
TOOL STRING NUMBER:
PASS NUMBER:
DEPTH INCREMENT:
FILE SUMMARY
FILE HEADER
FILE NUMBER: 2
RAW OPEN HOLE MAIN PASS
Curves and log header data for each run and tool string in separate files;
Tool String #1 presented first (primary depth control string used for depth
shifting) followed by files for other main pass tool strings per run.
RUN NUMBER: 1
1
3
.2500
VENDOR TOOL CODE START DEPTH STOP DEPTH
GR 10970.0 12004.0
DIFL 11031.0 12064.0
ZDL 1.0996.0 12033.0
2446 10978.0 12010.0
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE VERSION:
TIME CIRCULATION ENDED:
TIME LOGGER ON BOTTOM:
TD DRILLER (FT):
TD ~LOGGER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
LOGGING SPEED (FPHR):
TOOL STRING (TOP TO-BoTToM)
VENDOR TOOL CODE TOOL TYPE
SWIV
TEMP
COMR
GR
CN
ZDL
SLAM
KNJT
KNJT
DIFL
$
SWIVEL SUB
TEMPERATURE
WTS COMMON REMOTE
GAMMA RAY
COMPENSATED NEUTRON
Z-DENSILOG
SLAM ADAPTER
KNUCKLE JOINT
KNUCKLE JOINT
DUAL INDUCTION
18-FEB-96
ECLIPS 2.1
900 17-FEB-96
500 18-FEB-96
12090.0
12066.0
10970.0
12064.0
1500.0
TOOL NUMBER
3944XA
3981XA
3510XA
1329XA
2446XA
2228EA/2228MA
3516XA
3921NA
3921NA
1503XA
BOREHOLE AND CASING DATA
OPEN HOLE BIT-SIZE(IN):
DRILLER'S - CASING DEPTH (FT):
LOGGER'S CASING DEPTH (FT):
9.875
4737.0
.0
BOREHOLE CONDITIONS MUD TYPE:
MUD DENSITY (LB/G):
MUD VISCOSITY (S) :.
MUD PH:
FLUID LOSS (C3):
MAXIMUM RECORDED TEMPERATURE (DEGF):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
LSND
10.40
49.0
9.7
3.8
177.0
MUD AT MEASURED TEMPERATURE (MT):
MUD AT BOTTOM HOLE TEMPERATURE (BHT):
MUD FILTRATE AT MT:
MUD. FILTRATE ~T BHT:
· MUD CAKE AT MT.:
..
MUD CAKE AT BHT:
-.
NEUTRON 'TOOL
TOOL TYPE (EPITHERMAL OR THERMAL):
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL STANDOFF (IN):
REMARKS: MAIN PASS..
$
CN-
WN
FN
COUN
STAT
BP EXPLORATION (ALASKA)
1-59/0-24 PH
ENDICOTT
NORTH SLOPE
ALASKA
1.360
.561
.965
.000
1.750
.000
THERMAL
SANDSTONE
2.65
.000
1.5
73.0
177.0
73.0
.0
73.0
.0
* FORMAT RECORD
(TYPE# 64)
ONE DEPTH PER FRAME
Tape depth ID: F
20 Curves:
Name'Tool COde sampleS, units
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
1
2
3
4
5
6
7.
8
9
10
11
12
13
14
15
16
17
18
19
2O
GR DIFL 68
RFOC DIFL 68
RILM DIFL 68
RILD DIFL 68
.
RT DIFL 68
DI DIFL' 68
SP DIFL' 68
WTBH DIFL 68 1
CHT DIFL 68 1
TTEN DIFL 68 1
SPD DIFL 6'8 1
ZDEN ZDL 68 1
ZCOR ZDL 68 1
PE. ZDL 68 -1
CAL ZDL 68 1
CNC -2446 68 1
CNCF 2446 68
CN 2446 68 1
LSN 2446 68
$SN 2446 68 i
1
1
1
1
1
1.
1'
GAPI
OHMM
OHMM
OHMM
OHMM
IN
MV
DEGF
LB
LB
F/MN
G/C3
G/C3
BN/E
IN
PU-S
PU-S
PU-L
CPS
CPS.
4 4 07 310 01 1
4 4 07 220 06 1
4 4 07 120 44 1
4 4 '07 120 46 1
4 4 07 120 46 1
4 4 07 120 44 1
4 4~ 07 010 01 1
4 4 07 995 99 1
4 4 07 635 99 1
4 4 07 635 99 1
4 4 07 636 99 1
4 4 46 350 01 1
4 4 46 356 99 1
4 4 46 358 01 1
4 4 46 280 99 1
4 4 -47 995 99
4 4 47 995 99 1
4 4 47 890 01 1
4 4 47 334 31 1
4 4 47 334 30 1
8O
* DATA RECORD (TYPE# '0) 1014 BYTES *
Total Data Records: 372
Tape File Start. Depth = 12067.000000
Tape File End Depth = 10954.000000
Tape File Level Spacing = 0.250000
Tape File Depth-Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68 93514 datums
Tape Subfile: 3 452 records...
Minimum record length: 44 bytes
Maximum.record length: 1014 bytes
Tape Subfile 4 is type: LIS
FILE HEADER
FILE NUMBER: 3
RAW OPEN HOLE REPEAT PASSES
Curves and log header data for each pass, tool string, and run in separate
files'.
RUN NUMBER:
TOOL~STRINGNUMBER:
PASS NUMBER:
DEPTH INCREMENT:
FILE SUMMARY
1
1
2
.2500
VENDOR TOOL CODE START DEPTH STOP DEPTH
GR 11640.0 12005.0
DIFL 11701.0 12063.0
ZDL 11666.-0 12034.0
2446 -' 11.648.0 12012.0
$
LOG HEADER DATA
DATE LOGGED:
SOFTWARE VERSION:
TIME CIRCULATION ENDED:
TIME LOGGER ON BOTTOM:
TD DRILLER (FT):
TD LOGGER (FT):
TOP LOG INTERVAL (FT):
BOTTOM LOG INTERVAL (FT):
LOGGING SPEED (FPHR):
TOOL STRING (TOP TO BOTTOM)
VENDOR TOOL CODE TOOL TYPE
SWIV
TEMP
COMR
GR
CN
ZDL
SLAM
KNJT
KNJT
~DIFL
SWIVEL SUB
TEMPERATURE
WTS COMMON REMOTE
GAMMA RAY
COMPENSATED NEUTRON
Z-DENSILOG
SLAM ADAPTER
KNUCKLE JOINT
KNUCKLE JOINT
DUAL INDUCTION
BOREHOLE AND CASING DATA
-OPEN HOLE BIT SIZE(IN):
DRILLER'S CASING DEPTH (FT):
LOGGER' S CASING DEPTH (FT):
BOREHOLE CONDITIONS - MUD TYPE:
;MUD DENSITY (LB/G):
MUD VISCOSITY (S):
MUD PH:
FLUID LOSS (C3):
MAXIMUM RECORDED TEMPERATURE (DEGF):
RESISTIVITY (OHMM) AT TEMPERATURE (DEGF)
MUD AT MEASURED TEMPERATURE (MT):
18-FEB-96
ECLIPS 2.1
900 17-FEB-96
330 18-FEB-96
12090.0
12066.0
10970.0
12064.0
1500.0
TOOL NUMBER
3944XA
3981XA
3510XA
1329xA
2446XA
2228EA/222~MA
3516XA" ~
3921NA
3921NA
1503XA
9.875
4737.0
.0
LSND
10.40
49.0
9.7
3.8
177.0
1.360
73.0
MUD AT BOTTOM HOLE TEMPERATURE (BHT):
MUD FILTRATE AT MT:
MUD FILTRATE AT BHT:
MUD CAKE AT MT:
MUD CAKE AT BHT:
NEUTRON TOOL
TOOL TYPE (EPITHERMAL OR THERMAL):
MATRIX:
MATRIX DENSITY:
HOLE CORRECTION (IN):
TOOL STANDOFF (IN):
REMARKS: REPEAT PASS.
$
CN
WN
FN
COUN
STAT
: BP EXPLORATION (ALASKA)
: 1-59/0-24 PH
: ENDICOTT
: NORTH SLOPE
· ' ALASKA
.561
.965
.000
1.750
.000
THERMAL
SANDSTONE
2.65
.000
1.5
177.0
73.0
.0
73.0
.0
* FORMAT RECORD (TYPE# 64)
ONE DEPTH PER FRAME
Tape depth ID: F
20 Curves:
Name Tool Code Samples Units
API API API API
Log Crv Crv
Size Length Typ Typ Cls Mod
1 GR DIFL 68 1 GAPI
2 RFOC DIFL 68 ! OHMM
3 RILM DIFL 68 1 OHMM
4 RILD DIFL 68 1 OHMM
5 RT DIFL 68 1 _OHMM
6 DI DIFL 68 1 IN
7 SP DIFL 68 i MV
8 WTBH DIFL 68 I DEGF
9 CHT DIFL 68 1 LB
10 TTEN DIFL 68 1 LB ~
11 SPD DIFL 68 1 F/MN
12 ZDEN ZDL 68 1 G/C3
13 ZCOR ZDL 68 I G/C3
14 PE ZDL 68 1 BN/E
15 CAL ZDL 68 1 IN
16 CNC 2446 68 1 PU-S
17 CNCF 2446 68 1 PU-S
18 CN 2446 68 1 PU-L
19 LSN 2446 68 1 CPS
20 SSN 2446 68 1 CPS
4 4 07 310 01 1
4 4 07 220 06 1
4 4 07 120 44 1
4 4 07 120 46 1
4 4 07 120 46 1
4 4 07 120 44 1
4 4 07 010 01 1
4 4 07 995 99 1
4 4 07 635 99 1
4 4 07 635 99 1
4 4 07 636 99 1
4 4 46 350 01 1
4 4 46 356 99 1
4 4 46 358 01 1
4 4 46 280 99 1
4 4 47 995 99 1
4 4 47 995 99 1
4 4 47 890 01 1
4 4 47 334 31 1
4 4 47 334 30 1
80
* DATA RECORD (TYPES 0) . 1014 BYTES *
Total Data Rec~ ~s: 149
Tape File Start Depth = 12068,000000
Tape File End Depth = 11624,000000
Tape File Level Spacing.= 0,250000
Tape File Depth Units = Feet
**** FILE TRAILER ****
LIS representation code decoding summary:
Rep Code: 68
77405 datums
Tape Subfile: 4
228 records,,,
Minimum record length:
Maximum record length:
44 bytes
1014 bytes
Tape Subfile 5 is type: LIS
96/ 2/23
01
**** REEL TRAILER ****
96/ 2/23
01
Tape Subfile: 5 2 records...
Minimum record length: 132 bytes
Maximum record length: 132 bytes
End of execution: Fri 23 FEB 96 8:57a
Elapsed execution time = 1 minute , 29.0 seconds.
SYSTEM RETURN CODE = 0