Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
HOME
EVENTS
DATA
Data List
Drilling
Production
Orders
Data Miner
Document Search
REPORTS
Reports and Charts
Pool Statistics
FORMS
LINKS
Links
Test Notification
Data Requests
Regulations
Industry Guidance Bulletins
How to Apply
ABOUT US
History
Staff
HELP
Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
222-021
DATA SUBMITTAL COMPLIANCE REPORT API No.50-029-22452-01-00Well Name/No.KUPARUK RIV UNIT 1B-14A Completion Status 1-OILCompletion Date 4/28/2022 Permit to Drill 2220210 Operator ConocoPhillips Alaska, Inc. MD 12088 TVD 6593 Current Status 1-OIL 7/19/2023 UIC No Well Log Information: Digital Med/Frmt ReceivedStart Stop OH / CH Comments Log Media Run No Electr Dataset Number Name Interval List of Logs Obtained:GR/Res NoNo YesMud Log Samples Directional Survey REQUIRED INFORMATION (from Master Well Data/Logs) DATA INFORMATION Log/ Data Type Log Scale DF 5/31/20229124 12088 Electronic Data Set, Filename: 1B-14A GAMMA RES.las 36672ED Digital Data DF 5/31/2022 Electronic File: 222-021_1B- 14A_BKR_Distribution AOGCC.docx 36672ED Digital Data DF 5/31/2022 Electronic File: 1B-14A 2MD Final Log.cgm36672EDDigital Data DF 5/31/2022 Electronic File: 1B-14A 5MD FInal Log.cgm36672EDDigital Data DF 5/31/2022 Electronic File: 1B-14A 5TVDSS Final Log.cgm36672EDDigital Data DF 5/31/2022 Electronic File: 1B-14A_PWD Log_Run 01.cgm36672EDDigital Data DF 5/31/2022 Electronic File: 1B-14A_PWD Log_Run 02.cgm36672EDDigital Data DF 5/31/2022 Electronic File: 1B-14A_PWD Log_Run 03.cgm36672EDDigital Data DF 5/31/2022 Electronic File: 1B-14A_PWD Log_Run 04.cgm36672EDDigital Data DF 5/31/2022 Electronic File: 1B-14A_PWD Log_Run 05.cgm36672EDDigital Data DF 5/31/2022 Electronic File: 1B-14A_PWD Log_Run 06.cgm36672EDDigital Data DF 5/31/2022 Electronic File: 1B-14A GAMMA RES.ASC36672EDDigital Data DF 5/31/2022 Electronic File: 1B-14A_PWD Digital Data_Run 01.ASC 36672ED Digital Data DF 5/31/2022 Electronic File: 1B-14A_PWD Digital Data_Run 02.ASC 36672ED Digital Data DF 5/31/2022 Electronic File: 1B-14A_PWD Digital Data_Run 03.ASC 36672ED Digital Data DF 5/31/2022 Electronic File: 1B-14A_PWD Digital Data_Run 04.ASC 36672ED Digital Data DF 5/31/2022 Electronic File: 1B-14A_PWD Digital Data_Run 05.ASC 36672ED Digital Data Wednesday, July 19, 2023AOGCC Page 1 of 3 -14A GAMMA RES.las DATA SUBMITTAL COMPLIANCE REPORT API No.50-029-22452-01-00Well Name/No.KUPARUK RIV UNIT 1B-14A Completion Status 1-OILCompletion Date 4/28/2022 Permit to Drill 2220210 Operator ConocoPhillips Alaska, Inc. MD 12088 TVD 6593 Current Status 1-OIL 7/19/2023 UIC No DF 5/31/2022 Electronic File: 1B-14A_PWD Digital Data_Run 06.ASC 36672ED Digital Data DF 5/31/2022 Electronic File: 1B-14A 2MD Final Log.PDF36672EDDigital Data DF 5/31/2022 Electronic File: 1B-14A 5MD FInal Log.PDF36672EDDigital Data DF 5/31/2022 Electronic File: 1B-14A 5TVDSS Final Log.PDF36672EDDigital Data DF 5/31/2022 Electronic File: 1B-14A_PWD Log_Run 01.PDF36672EDDigital Data DF 5/31/2022 Electronic File: 1B-14A_PWD Log_Run 02.PDF36672EDDigital Data DF 5/31/2022 Electronic File: 1B-14A_PWD Log_Run 03.PDF36672EDDigital Data DF 5/31/2022 Electronic File: 1B-14A_PWD Log_Run 04.PDF36672EDDigital Data DF 5/31/2022 Electronic File: 1B-14A_PWD Log_Run 05.PDF36672EDDigital Data DF 5/31/2022 Electronic File: 1B-14A_PWD Log_Run 06.PDF36672EDDigital Data DF 5/31/2022 Electronic File: 1B-14A NAD27 Definitive Surveys.pdf 36672ED Digital Data DF 5/31/2022 Electronic File: 1B-14A NAD83 Definitive Surveys.pdf 36672ED Digital Data DF 5/31/2022 Electronic File: 1B-14A 2MD Final Log.tif36672EDDigital Data DF 5/31/2022 Electronic File: 1B-14A 5TVDSS Final Log.tif36672EDDigital Data DF 5/31/2022 Electronic File: 1B-14A_PWD Log_Run 01.tif36672EDDigital Data DF 5/31/2022 Electronic File: 1B-14A_PWD Log_Run 02.tif36672EDDigital Data DF 5/31/2022 Electronic File: 1B-14A_PWD Log_Run 03.tif36672EDDigital Data DF 5/31/2022 Electronic File: 1B-14A_PWD Log_Run 04.tif36672EDDigital Data DF 5/31/2022 Electronic File: 1B-14A_PWD Log_Run 05.tif36672EDDigital Data DF 5/31/2022 Electronic File: 1B-14A_PWD Log_Run 06.tif36672EDDigital Data DF 8/17/20228479 9830 Electronic Data Set, Filename: 1B-14A_11-Aug- 22_MainUpPass_50fpm.las 36883ED Digital Data DF 8/17/20229636 9829 Electronic Data Set, Filename: 1B-14A_11-Aug- 22_RepeatUpPass_50fpm.las 36883ED Digital Data DF 8/17/2022 Electronic File: 2022-08-11_20228_KRU_1B- 14A_CoilFlag_Tramsmittal.docx 36883ED Digital Data DF 8/17/2022 Electronic File: KRU_1B-14A_11-Aug- 22_CoilFlag.pdf 36883ED Digital Data Wednesday, July 19, 2023AOGCC Page 2 of 3 DATA SUBMITTAL COMPLIANCE REPORT API No.50-029-22452-01-00Well Name/No.KUPARUK RIV UNIT 1B-14A Completion Status 1-OILCompletion Date 4/28/2022 Permit to Drill 2220210 Operator ConocoPhillips Alaska, Inc. MD 12088 TVD 6593 Current Status 1-OIL 7/19/2023 UIC No Well Cores/Samples Information: ReceivedStart Stop Comments Total Boxes Sample Set NumberName Interval INFORMATION RECEIVED Completion Report Production Test Information Geologic Markers/Tops Y Y / NA Y Comments: Compliance Reviewed By:Date: Mud Logs, Image Files, Digital Data Composite Logs, Image, Data Files Cuttings Samples Y / NA Y Y / NA Directional / Inclination Data Mechanical Integrity Test Information Daily Operations Summary Y Y / NA Y Core Chips Core Photographs Laboratory Analyses Y / NA Y / NA Y / NA COMPLIANCE HISTORY Date CommentsDescription Completion Date:4/28/2022 Release Date:3/3/2022 DF 8/17/2022 Electronic File: KRU_1B-14A_11-Aug- 22_CoilFlag.tif 36883ED Digital Data Wednesday, July 19, 2023AOGCC Page 3 of 3 M. Guhl 7/19/2023 C:\Users\kmjunke\AppData\Local\Microsoft\Windows\INetCache\Content.Outlook\99RGP1KB\2022-08-11_20228_KRU_1B-14A_CoilFlag_Tramsmittal.docx DELIVERABLE DISCRIPTION Ticket # Field Well # API # Log Description Log Date 20228 KRU 1B-14A 50-029-22452-01 Coil Flag 11-Aug-22 DELIVERED TO Company & Address DIGITAL FILE # of Copies LOG PRINTS # of Prints CD’s # of Copies 1 AOGCC Attn: Natural Resources Technician 333 W. 7th Ave., Suite 100 Anchorage, Ak. 99501-3539 Delivered By: CPAI Sharefile ______________________________ ______________________________________ Date received Signature PLEASE RETURN COPY VIA EMAIL TO: DIANE.WILLIAMS@READCASEDHOLE.COM READ CASED HOLE, INC., 4141 B STREET, SUITE 308, ANCHORAGE, AK 99503 PHONE: (907)245-8951 E-MAIL : READ-Anchorage@readcasedhole.com WEBSITE : WWW.READCASEDHOLE.COM PTD:222-021 T36883 Kayla Junke Digitally signed by Kayla Junke Date: 2022.08.17 09:20:56 -08'00' By Samantha Carlisle at 12:57 pm, Aug 03, 2022 5HJJ-DPHV%2*& )URP%URRNV3KRHEH/2*& 6HQW7KXUVGD\-XO\30 7R&R]E\.HOO\ &F5HJJ-DPHV%2*& 6XEMHFW5(1DERUV(6 $WWDFKPHQWV1DERUV(6[OV[ )ROORZ8S)ODJ)ROORZXS )ODJ6WDWXV)ODJJHG <ĞůůLJ͕ ƚƚĂĐŚĞĚŝƐĂƌĞǀŝƐĞĚƌĞƉŽƌƚĐŚĂŶŐŝŶŐƚŚĞ&^sDŝƐĐƚŽϬ͞E͟ĂŶĚƌĞŵŽǀŝŶŐƚŚĞĚĂƐŚĨƌŽŵƚŚĞWdη͘WůĞĂƐĞƵƉĚĂƚĞLJŽƵƌ ĐŽƉLJŽƌůĞƚŵĞŬŶŽǁŝĨLJŽƵĚŝƐĂŐƌĞĞ͘ dŚĂŶŬLJŽƵ͕ WŚŽĞďĞ WŚŽĞďĞƌŽŽŬƐ ZĞƐĞĂƌĐŚŶĂůLJƐƚ ůĂƐŬĂKŝůĂŶĚ'ĂƐŽŶƐĞƌǀĂƚŝŽŶŽŵŵŝƐƐŝŽŶ WŚŽŶĞ͗ϵϬϳͲϳϵϯͲϭϮϰϮ CONFIDENTIALITY NOTICE: This e-mail message, including any attachments, contains information from the Alaska Oil and Gas Conservation Commission (AOGCC), State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged information. The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an unintended recipient of this e-mail, please delete it, without first saving or forwarding it, and, so that the AOGCC is aware of the mistake in sending it to you, contact Phoebe Brooks at 907-793-1242 or phoebe.brooks@alaska.gov. &ƌŽŵ͗ŽnjďLJ͕<ĞůůLJф<ĞůůLJ͘ŽnjďLJΛŶĂďŽƌƐ͘ĐŽŵх ^ĞŶƚ͗&ƌŝĚĂLJ͕:ƵůLJϭ͕ϮϬϮϮϳ͗ϯϴD dŽ͗ZĞŐŐ͕:ĂŵĞƐ;K'Ϳфũŝŵ͘ƌĞŐŐΛĂůĂƐŬĂ͘ŐŽǀх͖KK'WƌƵĚŚŽĞĂLJфĚŽĂ͘ĂŽŐĐĐ͘ƉƌƵĚŚŽĞ͘ďĂLJΛĂůĂƐŬĂ͘ŐŽǀх͖ ƌŽŽŬƐ͕WŚŽĞďĞ>;K'ͿфƉŚŽĞďĞ͘ďƌŽŽŬƐΛĂůĂƐŬĂ͘ŐŽǀх͖E^<ZtKDфŶƐŬƌǁŽ͘ĐŵΛĐŽŶŽĐŽƉŚŝůůŝƉƐ͘ĐŽŵх͖,ŽďďƐ͕'ƌĞŐ^ ф'ƌĞŐ͘^͘,ŽďďƐΛĐŽŶŽĐŽƉŚŝůůŝƉƐ͘ĐŽŵх͖<ŶĞĂůĞ͕DŝĐŚĂĞů>фŵŝĐŚĂĞů͘ů͘ŬŶĞĂůĞΛĐŽŶŽĐŽƉŚŝůůŝƉƐ͘ĐŽŵх Đ͗,ĞŶƐŽŶ͕:ĂŵĞƐф:ŝŵ͘,ĞŶƐŽŶΛŶĂďŽƌƐ͘ĐŽŵх͖,ŽůĐŽŵď͕^ĞĂŶф^ĞĂŶ͘,ŽůĐŽŵďΛŶĂďŽƌƐ͘ĐŽŵх͖zĞĂƌŽƵƚ͕WĂƵů фWĂƵů͘zĞĂƌŽƵƚΛŶĂďŽƌƐ͘ĐŽŵх ^ƵďũĞĐƚ͗EĂďŽƌƐϳ^ϲͬϮϵͬϮϮ dŚĂŶŬƐ͕ <ĞůůLJŽnjďLJ EĂďŽƌƐůĂƐŬĂƌŝůůŝŶŐ ZŝŐϳ^ZŝŐDĂŶĂŐĞƌ KĨĨŝĐĞϵϬϳͲϲϳϬͲϲϭϯϮ ĞůůϵϬϳͲϳϭϱͲϵϬϱϱ &$87,217KLVHPDLORULJLQDWHGIURPRXWVLGHWKH6WDWHRI$ODVNDPDLOV\VWHP'RQRWFOLFNOLQNVRURSHQ DWWDFKPHQWVXQOHVV\RXUHFRJQL]HWKHVHQGHUDQGNQRZWKHFRQWHQWLVVDIH .58%$ 37' ΎΎΎΎΎΎΎΎΎΎΎΎΎΎΎΎΎΎΎΎΎΎΎΎΎΎΎΎΎΎΎ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ll BOPE reports are due to the agency within 5 days of testing* SSu b m i t t o :jim.regg@alaska.gov; AOGCC.Inspectors@alaska.gov; phoebe.brooks@alaska.gov Owner/Contractor: Rig No.:7ES DATE: 6/29/22 Rig Rep.: Rig Phone: 670-6132 Operator: Op. Phone:670-6130 Rep.: E-Mail Well Name: PTD #22220210 Sundry #322-362 Operation: Drilling: Workover: x Explor.: Test: Initial: x Weekly: Bi-Weekly: Other: Rams:250/3500 Annular:250/3500 Valves:250/3500 MASP:2438 MISC. INSPECTIONS: TEST DATA FLOOR SAFETY VALVES: Test Result Test Result Quantity Test Result Location Gen.P Well Sign P Upper Kelly 1P Housekeeping P Rig P Lower Kelly 1P PTD On Location P Hazard Sec.P Ball Type 1P Standing Order Posted P Misc.NA Inside BOP 1P FSV Misc 0NA BOP STACK:Quantity Size/Type Test Result MUD SYSTEM:Visual Alarm Stripper 0NATrip Tank PP Annular Preventer 1 13 5/8" T 90 P Pit Level Indicators PP #1 Rams 1 3 1/2" x 5 1/2"P Flow Indicator PP #2 Rams 1 Blinds P Meth Gas Detector PP #3 Rams 1 2 7/8" x 5"NT H2S Gas Detector PP #4 Rams 0NAMS Misc 0NA #5 Rams 0NA #6 Rams 0NA Quantity Test Result Choke Ln. Valves 1 3 1/8" Gate P Inside Reel valves 0NA HCR Valves 2 3 1/8" Gate P Kill Line Valves 2 3 1/8" & 2"P Check Valve 0NAACCUMULATOR SYSTEM: BOP Misc 2 2 1/6" Gate P Time/Pressure Test Result System Pressure (psi)3000 P CHOKE MANIFOLD:Pressure After Closure (psi)1500 P Quantity Test Result 200 psi Attained (sec)16 P No. Valves 16 P Full Pressure Attained (sec)96 P Manual Chokes 1P Blind Switch Covers: All stations Yes Hydraulic Chokes 1P Nitgn. Bottles # & psi (Avg.): 5 @ 2000 psi P CH Misc 0NA ACC Misc 0NA Test Results Number of Failures:0 Test Time:5.5 Hours Repair or replacement of equipment will be made within 0 days. Remarks: AOGCC Inspection 24 hr Notice Yes Date/Time 6/28/22 5:29 am Waived By Test Start Date/Time:6/29/2022 8:30 (date) (time)Witness Test Finish Date/Time:6/29/2022 14:00 BOPE Test Report Notify the AOGCC of repairs with written confirmation to: AOGCC.Inspectors@alaska.gov Bob Noble Nabors Tested with 31/2" test jnt.. Spacer/Test spool installed 2 valves included in BOP Misc. Kelly Cozby / Paul Yearout ConocoPhillips Dale Rowell / K.Barr KRU 1B-14A Test Pressure (psi): nskrwo.cm@conocophillips.com Form 10-424 (Revised 02/2022) 2022-0629_BOP_Nabors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y Samantha Carlisle at 10:57 am, Jun 20, 2022 Adam Klem Digitally signed by Adam Klem Date: 2022.06.14 14:51:55 -08'00' ; '65'/% %23 WHVW SVLJ $QQXODU SUHYHQWHU WHVW WR SVLJ ; ; 97/ GWV Jeremy Price Digitally signed by Jeremy Price Date: 2022.06.24 13:32:10 -08'00' RBDMS JSB 070522 32%2; $1&+25$*($/$6.$ -XQH &RPPLVVLRQHU 6WDWHRI$ODVND $ODVND2LO *DV&RQVHUYDWLRQ&RPPLVVLRQ :HVWWK$YHQXH6XLWH $QFKRUDJH$ODVND 'HDU&RPPLVVLRQHU $GDP.OHP 6HQLRU5:2&7'(QJLQHHU &3$,'ULOOLQJDQG:HOOV &RQRFR3KLOOLSV$ODVND,QFKHUHE\VXEPLWVDQ$SSOLFDWLRQIRU6XQGU\$SSURYDOWRZRUNRYHU3URGXFHU%37' :HOO%ZDVGULOOHGDQGFRPSOHWHGLQ-XQHRIE\3DUNHUDVDSURGXFHUIURPWKH$DQG&VDQGV,QWKLV ZHOOZDVZRUNHGRYHUDQGVHYHUDOODWHUDOVZHUH&7'IURPWKHPDLQERUH+RZHYHUDWWKHHQGRI&7'RSHUDWLRQVWKH 6669EHFDPHGDPDJHG$ZRUNRYHULVUHTXLUHGWRSXOODQGUHSODFHWKHFRPSOHWLRQZLWKDQHZ6669 ,I\RXKDYHDQ\TXHVWLRQVRUUHTXLUHDQ\IXUWKHULQIRUPDWLRQSOHDVHFRQWDFWPHDW Adam Klem Digitally signed by Adam Klem Date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« :W/HQOE« *UDGH + 7RS&RQQHFWLRQ :(/'(' &DVLQJ'HVFULSWLRQ 685)$&( 2'LQ ,'LQ 7RSIW.% 6HW'HSWKIW.% 6HW'HSWK79'« :W/HQOE« *UDGH - 7RS&RQQHFWLRQ %7& &DVLQJ'HVFULSWLRQ 352'8&7,21[# 2'LQ ,'LQ 7RSIW.% 6HW'HSWKIW.% 6HW'HSWK79'« :W/HQOE« *UDGH / 7RS&RQQHFWLRQ /7&02' &DVLQJ'HVFULSWLRQ $/DW6ORWWHG/LQHU 2'LQ ,'LQ 7RSIW.% 6HW'HSWKIW.% 6HW'HSWK79'« :W/HQOE« *UDGH / 7RS&RQQHFWLRQ 67/ /LQHU'HWDLOVH[FOXGHVOLQHUSXSMRLQWVFDVLQJVXEVKRHIORDW 7RSIW.% 7RS79' IW.% 7RS,QFO ,WHP'HV &RP 1RPLQDO,'LQ 'HSOR\PHQW 6OHHYH 6KRUW\GHSOR\PHQWVOHHYH 7XELQJ6WULQJVVWULQJPD[LQGLFDWHV/21*(67VHJPHQWRIVWULQJ 7XELQJ'HVFULSWLRQ 7XELQJ±&RPSOHWLRQ8SSHU 6WULQJ« ,'LQ 7RSIW.% 6HW'HSWKIW« 6HW'HSWK79'« :WOEIW *UDGH / 7RS&RQQHFWLRQ (8( &RPSOHWLRQ'HWDLOVH[FOXGHVWXELQJSXSVSDFHRXWWKUHDG5.% 7RSIW.% 7RS79' IW.% 7RS,QFO ,WHP'HV 1RPLQDO,' LQ 2' 1RPLQDO LQ0DNH 0RGHO +DQJHU &DPHURQ *HQ 66691RWH9DOYHLV1RQ IXQFWLRQDO)ODSSHUFORVHVZLWK &/SUHVVXUHLVDSSOLHG 6/% 750$;;( 0DQGUHO 6/% 00* 0DQGUHO 6/% 00* 0DQGUHO 6/% 00* 0DQGUHO 6/% 00* 0DQGUHO 6/% 00* 3DFNHU 6/% %OXH3DFN5+ 1LSSOH; +DOOLEXUWRQ ;1LSSOH 0XOH6KRH %DNHU 0XOHKRH 2WKHU,Q+ROH:LUHOLQHUHWULHYDEOHSOXJVYDOYHVSXPSVILVKHWF 7RS IW.% 7RS 79' IW.% 7RS,QFO 'HV &RP 5XQ'DWH ,'LQ 61 :+,3672&. 1257+(5162/87,216 02123$&.5(75,(9$%/(,11(5 :('*(72:6 25,(17(' '(*52+65$7$*$7 2$/ :+,3672&. 1257+(5162/87,216 02123$&.5(75,(9$%/(,11(5 :('*(72:6 25,(17(' '(*52+65$7$*$7 2$/ $ 5 :+,3672&. 1257+(5162/87,216 02123$&.5(75,(9$%/(,11(5 :('*(72:6 25,(17(' '(*52+65$7$*$7 2$/ &(0(17 5(7$,1(5 )+75,3&(0(175(7$,1(5 ),6+ ),6+/26721(+$/)2)-''2*,1 +2/(:[/7+,&. 0DQGUHO,QVHUWVH[FOXGHVSXOOHGLQVHUWV 6W DWL RQ 1 R7RSIW.% 7RS79' IW.% 7RS ,QFO 0DNH 0RGHO 2'LQ 6HUY 9DOYH 7\SH /DWFK 7\SH 3RUW6L]H LQ 7525XQ SVL 5XQ'DWH &RP &DPFR 00* */9 5. &DPFR 00* */9 5. &DPFR 00* */9 5. &DPFR 00* */9 5. &DPFR 00* 29 5. 3HUIRUDWLRQV 6ORWV 7RSIW.% %WPIW.% 7RS79' IW.% %WP79' IW.% /LQNHG=RQH 'DWH 6KRW 'HQV VKRWVIW 7\SH &RP &&& % $3(5) (QHUMHWSK GHJRULHQW &% $3(5) +&3RZHUMHWSK $% ,3(5) +6'&VJJXQV SK &HPHQW6TXHH]HV 7RSIW.% %WPIW.% 7RS79' IW.% %WP79' IW.% 'HV &RP 3XPS6WDUW 'DWH &HPHQW3OXJ %%/2)33*&/$66*&(0(17 )2//2:('%<%%/2)33*/2&.&(0 &(0(17 &HPHQW 6TXHH]H %%/2)33*&/$66*&(0(17 )2//2:('%<%%/2)33*/2&.&(0 &(0(17 %$0 9HUWLFDOVFKHPDWLFDFWXDO $/DW6ORWWHG/LQHU 6KRH ;27KUHDGV&DVLQJ ;27KUHDGV&DVLQJ 352'8&7,21[# )/2$76+2( ),6+ )/2$7&2//$5 0XOH6KRH &(0(175(7$,1(5 &HPHQW3OXJIW.% :+,3672&. :+,3672&. ,3(5) 'HSOR\PHQW6OHHYH :+,3672&. &HPHQW6TXHH]HIW.% $3(5) $3(5) 1LSSOH; 3DFNHU 0DQGUHO 0DQGUHO $QQXODU)OXLG*HO&KHP 0DQGUHO 685)$&( )/2$76+2( )/2$7&2//$5 0DQGUHO 0DQGUHO 66691RWH9DOYHLV1RQ IXQFWLRQDO)ODSSHUFORVHVZLWK &/SUHVVXUHLVDSSOLHG $QQXODU)OXLG'LHVHO &21'8&725 +$1*(5 +DQJHU .83352' .%*UGIW 55'DWH 2WKHU(OHY«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y Meredith Guhl at 10:12 am, Jun 15, 2022 Completed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dam Klem Digitally signed by Adam Klem Date: 2022.06.13 16:25:33 -08'00' !" #$% & !" '''( )*)!+,-./0,!"1 &21/3."02!34 4 44 '553,%16 16!789: ;3./. 3 82.9: 0,-./0.37 < ;$ 5 +4 .!= #$% 5%5 +4 $1 !5.3304 &20>0.!7 5 +4 #$% Last Tag Annotation Depth (ftKB) End Date Wellbore Last Mod By Last Tag: Corrected to RKB 9,795.0 2/24/2018 1B-14 fergusp Last Rev Reason Annotation End Date Wellbore Last Mod By Rev Reason: Added note about SSSV 5/13/2022 1B-14 fergusp Casing Strings Casing Description CONDUCTOR OD (in) 16 ID (in) 15.06 Top (ftKB) 42.0 Set Depth (ftKB) 121.0 Set Depth (TVD) … 121.0 Wt/Len (lb… 62.50 Grade H-40 Top Connection WELDED Casing Description SURFACE OD (in) 9 5/8 ID (in) 8.92 Top (ftKB) 41.1 Set Depth (ftKB) 5,698.4 Set Depth (TVD) … 4,095.6 Wt/Len (lb… 36.00 Grade J-55 Top Connection BTC Casing Description PRODUCTION 7x5 @9256' OD (in) 7 ID (in) 6.28 Top (ftKB) 38.7 Set Depth (ftKB) 9,972.1 Set Depth (TVD) … 6,779.0 Wt/Len (lb… 26.00 Grade L-80 Top Connection LTC MOD Casing Description A Lat, Slotted Liner OD (in) 2 3/8 ID (in) 1.99 Top (ftKB) 9,770.3 Set Depth (ftKB) 11,095.0 Set Depth (TVD) … Wt/Len (lb… 4.60 Grade L-80 Top Connection STL Liner Details: excludes liner, pup, joints, casing, sub , shoe , float... Top (ftKB) Top (TVD) (ftKB) Top Incl (°) Item Des Com Nominal ID (in) 9,770.3 6,617.9 37.60 Deployment Sleeve Shorty deployment sleeve 1.920 Tubing Strings: string max indicates LONGEST segment of string Tubing Description Tubing – Completion Upper String … 3 1/2 ID (in) 2.99 Top (ftKB) 38.6 Set Depth (ft… 9,823.5 Set Depth (TVD… 6,660.1 Wt (lb/ft) 9.30 Grade L-80 Top Connection EUE Completion Details: excludes tubing, pup, space out, thread, RKB... Top (ftKB) Top (TVD) (ftKB) Top Incl (°) Item Des Nominal ID (in) OD Nominal (in)Make Model 38.6 38.6 0.03 Hanger 3.900 6.930 Cameron Gen 4 1,921.1 1,863.6 31.22 SSSV Note:Valve is Non- functional. Flapper closes with C/L pressure is applied. 05-13- 22 2.812 3.500 SLB TRMAXX 5-E 2,857.5 2,511.2 55.61 Mandrel 2.992 5.375 SLB MMG 4,963.1 3,691.7 56.15 Mandrel 2.992 5.375 SLB MMG 6,785.7 4,699.0 56.44 Mandrel 2.992 5.375 SLB MMG 8,199.9 5,507.0 54.33 Mandrel 2.992 5.375 SLB MMG 8,953.6 5,995.8 44.71 Mandrel 2.992 5.375 SLB MMG 9,104.9 6,104.7 42.75 Packer 2.992 6.280 SLB BluePack RH 9,125.7 6,120.1 42.17 Nipple -X 2.813 4.500 Halliburton X Nipple 9,815.9 6,654.0 37.33 Mule Shoe 2.992 3.500 Baker Mulehoe Other In Hole (Wireline retrievable plugs, valves, pumps, fish, etc.) Top (ftKB) Top (TVD) (ftKB) Top Incl (°) Des Com Run Date ID (in) SN 9,735.0 6,589.9 37.80 WHIPSTOCK NORTHERN SOLUTIONS 350-272 MONOPACK RETRIEVABLE INNER WEDGE, TOWS 9735', ORIENTED 0.00 DEG ROHS, RA TAG AT 9740', OAL 11.19' 5/5/2022 0.000 9,770.0 6,617.6 37.60 WHIPSTOCK NORTHERN SOLUTIONS 350-272 MONOPACK RETRIEVABLE INNER WEDGE, TOWS 9770', ORIENTED 0.74 DEG ROHS, RA TAG AT 9775', OAL 11.19' 4/13/2022 0.000 A10935008- R00 9,784.0 6,628.7 37.51 WHIPSTOCK NORTHERN SOLUTIONS 350-272 MONOPACK RETRIEVABLE INNER WEDGE, TOWS 9770', ORIENTED 0.74 DEG ROHS, RA TAG AT 9775', OAL 11.19' 4/23/2022 0.000 9,815.0 6,653.3 37.33 CEMENT RETAINER FH 1-TRIP CEMENT RETAINER 4/5/2022 0.000 9,900.0 6,721.1 36.83 FISH FISH - LOST ONE HALF OF JD DOG IN HOLE (.5" W x 3.5"L, .205" THICK) 12/1/03 12/1/2003 0.000 Mandrel Inserts : excludes pulled inserts St ati on N o/Top (ftKB) Top (TVD) (ftKB) Top Incl (°) Make Model OD (in) Serv Valve Type Latch Type Port Size (in) TRO Run (psi) Run Date Com 5 2,857.5 2,511.2 55.61 Camco MMG 1 1/2 GLV RK 0.188 1,301.0 4/6/2022 4 4,963.1 3,691.7 56.15 Camco MMG 1 1/2 GLV RK 0.188 1,292.0 4/6/2022 3 6,785.7 4,699.0 56.44 Camco MMG 1 1/2 GLV RK 0.188 1,283.0 4/6/2022 2 8,199.9 5,507.0 54.33 Camco MMG 1 1/2 GLV RK 0.188 1,273.0 4/6/2022 1 8,953.6 5,995.8 44.71 Camco MMG 1 1/2 OV RK 0.250 0.0 4/6/2022 Perforations & Slots Top (ftKB) Btm (ftKB) Top (TVD) (ftKB) Btm (TVD) (ftKB) Linked Zone Date Shot Dens (shots/ft )Type Com 9,332.0 9,408.0 6,276.6 6,334.9 C-4, C-3, C-2, 1B-14 10/29/1994 6.0 APERF 2 1/8 Enerjet; 90° ph; +/- 45 deg orient 9,486.0 9,506.0 6,395.1 6,410.6 C-1, 1B-14 11/13/2000 4.0 APERF 2 1/2 HC Powerjet; 180° ph 9,755.0 9,788.0 6,605.7 6,631.9 A-4, 1B-14 6/4/1994 4.0 IPERF 3 3/8 HSD Csg guns; 180° ph Cement Squeezes Top (ftKB) Btm (ftKB) Top (TVD) (ftKB) Btm (TVD) (ftKB) Des Com Pump Start Date 9,815.0 9,972.0 6,653.3 6,778.9 Cement Plug 10 BBL OF 15.8 PPG CLASS G CEMENT FOLLOWED BY 5 BBL OF 14.5 PPG LOCKCEM CEMENT 4/8/2022 9,332.0 9,815.0 6,276.6 6,653.3 Cement Squeeze 10 BBL OF 15.8 PPG CLASS G CEMENT FOLLOWED BY 5 BBL OF 14.5 PPG LOCKCEM CEMENT 4/8/2022 1B-14, 5/14/2022 10:13:07 AM Vertical schematic (actual) A Lat, Slotted Liner; 9,770.3- 11,095.0 Shoe; 11,094.6-11,095.0 XO Threads (Casing); 11,093.0- 11,094.6 XO Threads (Casing); 11,002.8- 11,004.6 PRODUCTION 7x5 @9256'; 38.7-9,972.1 FLOAT SHOE; 9,970.8-9,972.1 FISH; 9,900.0 FLOAT COLLAR; 9,887.4- 9,888.7 Mule Shoe; 9,815.8 CEMENT RETAINER; 9,815.0 Cement Plug; 9,815.0 ftKB WHIPSTOCK; 9,784.0 WHIPSTOCK; 9,770.0 IPERF; 9,755.0-9,788.0 Deployment Sleeve; 9,770.3- 9,771.2 WHIPSTOCK; 9,735.0 Cement Squeeze; 9,332.0 ftKB APERF; 9,486.0-9,506.0 APERF; 9,332.0-9,408.0 Nipple -X; 9,125.7 Packer; 9,104.9 Mandrel; 8,953.6 Mandrel; 8,199.9 Annular Fluid - Gel Chem; 2,000.0-12,235.0; 5/13/2022 Mandrel; 6,785.7 SURFACE; 41.1-5,698.4 FLOAT SHOE; 5,696.8-5,698.4 FLOAT COLLAR; 5,622.2- 5,623.5 Mandrel; 4,963.1 Mandrel; 2,857.5 SSSV Note:Valve is Non- functional. Flapper closes with C/L pressure is applied. 05-13- 22; 1,921.1 Annular Fluid - Diesel; 25.0- 2,000.0; 5/13/2022 CONDUCTOR; 42.0-121.0 HANGER; 41.1-44.8 Hanger; 38.6 KUP PROD KB-Grd (ft) 41.60 RR Date 3/19/1994 Other Elev… 1B-14 ... TD Act Btm (ftKB) 9,986.0 Well Attributes Field Name KUPARUK RIVER UNIT Wellbore API/UWI 500292245200 Wellbore Status PROD Max Angle & MD Incl (°) 57.18 MD (ftKB) 5,411.42 WELLNAME WELLBORE1B-14 Annotation Last WO: End Date 4/1/2022 H2S (ppm) 32 Date 1/31/2019 Comment SSSV: TRDP Casing Strings Casing Description CONDUCTOR OD (in) 16 ID (in) 15.06 Top (ftKB) 42.0 Set Depth (ftKB) 121.0 Set Depth (TVD) … 121.0 Wt/Len (lb… 62.50 Grade H-40 Top Connection WELDED Casing Description SURFACE OD (in) 9 5/8 ID (in) 8.92 Top (ftKB) 41.1 Set Depth (ftKB) 5,698.4 Set Depth (TVD) … 4,095.6 Wt/Len (lb… 36.00 Grade J-55 Top Connection BTC Casing Description PRODUCTION 7x5 @9256' OD (in) 7 ID (in) 6.28 Top (ftKB) 38.7 Set Depth (ftKB) 9,972.1 Set Depth (TVD) … 6,659.1 Wt/Len (lb… 26.00 Grade L-80 Top Connection LTC MOD Casing Description A Lat, Slotted Liner OD (in) 2 3/8 ID (in) 1.99 Top (ftKB) 9,770.3 Set Depth (ftKB) 11,095.0 Set Depth (TVD) … 6,592.1 Wt/Len (lb… 4.60 Grade L-80 Top Connection STL Liner Details: excludes liner, pup, joints, casing, sub , shoe , float... Top (ftKB) Top (TVD) (ftKB) Top Incl (°) Item Des Com Nominal ID (in) 9,770.3 6,617.9 37.67 Deployment Sleeve Shorty deployment sleeve 1.920 Tubing Strings: string max indicates LONGEST segment of string Tubing Description Tubing – Completion Upper String … 3 1/2 ID (in) 2.99 Top (ftKB) 38.6 Set Depth (ft… 9,823.5 Set Depth (TVD… 6,654.6 Wt (lb/ft) 9.30 Grade L-80 Top Connection EUE Completion Details: excludes tubing, pup, space out, thread, RKB... Top (ftKB) Top (TVD) (ftKB) Top Incl (°) Item Des Nominal ID (in) OD Nominal (in)Make Model 38.6 38.6 0.00 Hanger 3.900 6.930 Cameron Gen 4 1,921.1 1,863.6 31.22 SSSV Note:Valve is Non- functional. Flapper closes with C/L pressure is applied. 05-13- 22 2.812 3.500 SLB TRMAXX 5-E 2,857.5 2,511.2 55.61 GAS LIFT 2.992 5.375 SLB MMG 4,963.1 3,691.7 56.15 GAS LIFT 2.992 5.375 SLB MMG 6,785.7 4,699.0 56.44 GAS LIFT 2.992 5.375 SLB MMG 8,199.9 5,507.0 54.33 GAS LIFT 2.992 5.375 SLB MMG 8,953.6 5,995.8 44.71 GAS LIFT 2.992 5.375 SLB MMG 9,104.9 6,104.7 42.75 Packer 2.992 6.280 SLB BluePack RH 9,125.7 6,120.1 42.17 Nipple -X 2.813 4.500 Halliburton X Nipple 9,815.9 6,650.3 53.74 Mule Shoe 2.992 3.500 Baker Mulehoe Other In Hole (Wireline retrievable plugs, valves, pumps, fish, etc.) Top (ftKB) Top (TVD) (ftKB) Top Incl (°) Des Com Run Date ID (in) SN 9,735.0 6,589.9 37.81 WHIPSTOCK NORTHERN SOLUTIONS 350-272 MONOPACK RETRIEVABLE INNER WEDGE, TOWS 9735', ORIENTED 0.00 DEG ROHS, RA TAG AT 9740', OAL 11.19' 5/5/2022 0.000 Mandrel Inserts : excludes pulled inserts St ati on N o/Top (ftKB) Top (TVD) (ftKB) Top Incl (°) Make Model OD (in) Serv Valve Type Latch Type Port Size (in) TRO Run (psi) Run Date Com 1 2,857.5 2,511.2 55.61 Camco MMG 1 1/2 GLV RK 0.188 1,301.0 4/6/2022 2 4,963.1 3,691.7 56.15 Camco MMG 1 1/2 GLV RK 0.188 1,292.0 4/6/2022 3 6,785.7 4,699.0 56.44 Camco MMG 1 1/2 GLV RK 0.188 1,283.0 4/6/2022 4 8,199.9 5,507.0 54.33 Camco MMG 1 1/2 GLV RK 0.188 1,273.0 4/6/2022 5 8,953.6 5,995.8 44.71 Camco MMG 1 1/2 OV RK 0.250 0.0 4/6/2022 Cement Squeezes Top (ftKB) Btm (ftKB) Top (TVD) (ftKB) Btm (TVD) (ftKB) Des Com Pump Start Date 9,815.0 9,972.0 6,649.8 6,659.1 Cement Plug 10 bbl of 15.8 ppg CLASS G CEMENT FOLLOWED BY 5 bbl of 14.5 ppg LOCKCEM CEMENT 4/8/2022 9,332.0 9,815.0 6,276.6 6,649.8 Cement Squeeze 10 bbl of 15.8 ppg CLASS G CEMENT FOLLOWED BY 5 BBL OF 14.5 PPG LOCKCEM CEMENT 4/8/2022 Notes: General & Safety End Date Annotation NOTE: 1B-14A, 6/13/2022 2:17:15 PM Vertical schematic (actual) A Lat, Slotted Liner; 9,770.3- 11,095.0 PRODUCTION 7x5 @9256'; 38.7-9,972.1 Cement Plug; 9,815.0 ftKB WHIPSTOCK; 9,735.0 Cement Squeeze; 9,332.0 ftKB Nipple -X; 9,125.7 Packer; 9,104.9 GAS LIFT; 8,953.6 GAS LIFT; 8,199.9 GAS LIFT; 6,785.7 SURFACE; 41.1-5,698.4 GAS LIFT; 4,963.1 GAS LIFT; 2,857.5 SSSV Note:Valve is Non- functional. Flapper closes with C/L pressure is applied. 05-13- 22; 1,921.1 CONDUCTOR; 42.0-121.0 Hanger; 38.6 KUP PROD KB-Grd (ft) 41.60 RR Date 3/19/1994 Other Elev… 1B-14A ... TD Act Btm (ftKB) 11,095.3 Well Attributes Field Name KUPARUK RIVER UNIT Wellbore API/UWI 500292245201 Wellbore Status PROD Max Angle & MD Incl (°) 103.92 MD (ftKB) 10,071.03 WELLNAME WELLBORE1B-14 Annotation Last WO: End Date 4/1/2022 H2S (ppm) 32 Date 1/31/2019 Comment SSSV: TRDP Page 1/20 1B-14 Report Printed: 5/31/2022 Operations Summary (with Timelog Depths) Job: DRILLING SIDETRACK Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 4/21/2022 12:00 4/21/2022 14:00 2.00 MIRU, MOVE RURD P Continue to work rig down checklist on 1F-03 0.0 0.0 4/21/2022 14:00 4/21/2022 14:45 0.75 MIRU, MOVE RURD P NES rig move trucks on location. Load shop and prep for transport. 0.0 0.0 4/21/2022 14:45 4/21/2022 15:00 0.25 MIRU, MOVE SFTY P PJSM for pulling off well / rig move 0.0 0.0 4/21/2022 15:00 4/21/2022 16:00 1.00 MIRU, MOVE DMOB P Attach sow to service mod, pull from well row and stage on pad. 0.0 0.0 4/21/2022 16:00 4/21/2022 16:15 0.25 MIRU, MOVE DMOB P Pick service mod mats 0.0 0.0 4/21/2022 16:15 4/21/2022 17:03 0.80 MIRU, MOVE DMOB P Attach sow to sub, pull off well, stage sub on pad and drop sow. 0.0 0.0 4/21/2022 17:03 4/21/2022 19:03 2.00 MIRU, MOVE DMOB P Drop 3-1/8" swab from stack in preparation for 4-1/16" valve installation on 1B-14 0.0 0.0 4/21/2022 19:03 4/21/2022 19:33 0.50 MIRU, MOVE DMOB P Attach jeep, sow and weighted sow to service mod 0.0 0.0 4/21/2022 19:33 4/21/2022 20:03 0.50 MIRU, MOVE DMOB P Attach jeep, sow and weighted sow to sub mod 0.0 0.0 4/21/2022 20:03 4/21/2022 21:03 1.00 MIRU, MOVE MOB P Pull off 1F pad and travel to 1B-14 0.0 0.0 4/21/2022 21:03 4/21/2022 21:21 0.30 MIRU, MOVE RURD P Remove sows and jeep on servic mod. Attach sow 0.0 0.0 4/21/2022 21:21 4/21/2022 21:39 0.30 MIRU, MOVE RURD P Remove sows and jeep on sub mod. Attach sow 0.0 0.0 4/21/2022 21:39 4/21/2022 22:21 0.70 MIRU, MOVE RURD P Pull 4.5" tree cap and install 4-1/16" swab valve. 0.0 0.0 4/21/2022 22:21 4/21/2022 23:57 1.60 MIRU, MOVE RURD P Spot sub over well, place mats, remove sow, come off jacks 0.0 0.0 4/21/2022 23:57 4/22/2022 00:00 0.05 MIRU, MOVE RURD P Spot inner mats 0.0 0.0 4/22/2022 00:00 4/22/2022 01:30 1.50 MIRU, MOVE RURD P continue to spot inner mats, spot service module, remove sow, come off jack. 0.0 0.0 4/22/2022 01:30 4/22/2022 04:30 3.00 MIRU, MOVE RURD P Safe out stairs and walkways, Work rig up check list 0.0 0.0 4/22/2022 04:30 4/22/2022 06:30 2.00 MIRU, WHDBOP NUND P Nipple up BOP's *** Rig Accepted @ 06:00 *** 0.0 0.0 4/22/2022 06:30 4/22/2022 10:30 4.00 MIRU, WHDBOP CTOP P Grease surface valves and tree valves // Flood surface lines // Tighten 4-1/16" equipment // shell test 4-1/16" equipment for leaks 0.0 0.0 Rig: NABORS CDR3-AC RIG RELEASE DATE 5/14/2022 Page 2/20 1B-14 Report Printed: 5/31/2022 Operations Summary (with Timelog Depths) Job: DRILLING SIDETRACK Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 4/22/2022 10:30 4/22/2022 20:00 9.50 MIRU, WHDBOP BOPE P BOP test witness waived by AOGCC Austin McLeod 250/3500 psi Test 1. Swab 2- Pass Test 2. Blind/Shear, BOP TV2, Charlie 4, 5, 8, &12 - Pass Test 3. BOP TV 1, Charlie 3, 7, & 11 - Test 4. Manual choke D & Super choke C - Pass Test 5. Romeo 3, Bleeder 3, Tango 2, Charlie 2, & 10 - Pass Test 6. Charlie 1, 9, Bravo 5, and Tango 1 – Bravo 5 Fail, greased Pass, Charlie 1 & 9 Pass Tango 1 Pass - install TIW test joint - Test 7. Lower 2” pipe slip rams, TIW #1, Romeo 1, Bleeder 1 - Pass Test 8. Annular BOP 250/2500- Pass Test 9. Upper 2” pipe slip rams, Bravo 6, & 8- Pass Test 10. Bravo 7 – swap out 2” test joint for 2-3/8”- Pass Test 11. 2-3/8” pipe slip rams, TIW#2 – check N2 levels, swap to 2” test joint- Pass Test 12. Draw down accumulator- Pass Test 13. Stab injector and line up to reverse circulate coil, test inner reel valve and stripper. Tested all gas detectors, pits, cellar, Verified flow alarms - PVT 0.0 0.0 4/22/2022 20:00 4/22/2022 21:00 1.00 MIRU, WHDBOP CTOP P Stab and test both DS PDL and ODS PLD as well as tiger tanks line to 3,500 psi. - good Blow down choke - valve checklist 0.0 0.0 4/22/2022 21:00 4/22/2022 21:30 0.50 PROD1, WHPST SFTY P Pre spud with both day and night crew - Crew change 0.0 0.0 4/22/2022 21:30 4/22/2022 23:42 2.20 PROD1, WHPST PULD P PU BHA #1, window milling assembly, 2- 3/8" fixed bend 1 ° motor. With NS diamond speed mill and reamer, both 2.80" go, 2.79 no go. Bump up, set counters *** Opened up to 225 psi tubing pressure 0.0 77.2 4/22/2022 23:42 4/23/2022 00:00 0.30 PROD1, WHPST TRIP P RIH w BHA #1 77.2 499.0 4/23/2022 00:00 4/23/2022 02:00 2.00 PROD1, WHPST TRIP P Park @ 499', close EDC, online pumping seawater at 0.6 bpm down the coil, exporting returns to the tiger tank. Continue to RIH @ 80 ft/ min - spinning the bit - first trip in hole 499.0 9,180.0 4/23/2022 02:00 4/23/2022 02:12 0.20 PROD1, WHPST DLOG P Tie into the K1 for -6.5' correction, PU Wt 37 k lbs 9,180.0 9,240.0 4/23/2022 02:12 4/23/2022 02:30 0.30 PROD1, WHPST TRIP P Continue to RIH. Good seawater returns back, start displacing coil / tubing to milling fluid. Dry tag TOWS @ 9783', stack 2.5 k lbs WOB. ** WS was set off depth or slid down hole. 9,240.0 9,784.0 4/23/2022 02:30 4/23/2022 02:54 0.40 PROD1, WHPST DISP T PU Wt 33k lbs, PUH - open EDC. Continue to displace well to PowerPro milling fluid 9,784.0 9,180.0 4/23/2022 02:54 4/23/2022 03:00 0.10 PROD1, WHPST DLOG T Tie in to the K1 for no correction 9,180.0 9,209.0 4/23/2022 03:00 4/23/2022 03:12 0.20 PROD1, WHPST DLOG T RBIH, tag TOWS at 30 ft/min stack WOB to 9 k lbs, 9,209.0 9,784.0 Rig: NABORS CDR3-AC RIG RELEASE DATE 5/14/2022 PU BHA #1, window milling assembly, gg Dry tag TOWS @ 9783', RIH w BHA #1 Page 3/20 1B-14 Report Printed: 5/31/2022 Operations Summary (with Timelog Depths) Job: DRILLING SIDETRACK Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 4/23/2022 03:12 4/23/2022 03:24 0.20 PROD1, WHPST DLOG T PU Wt 39 k lbs, PUH while circulating milling fluid to surface. Good milling fluid in and out 8.85 ppg. Take returns back inside. 9,784.0 9,784.0 4/23/2022 03:24 4/23/2022 05:00 1.60 PROD1, WHPST TRIP T POOH for WS run 2 9,784.0 77.0 4/23/2022 05:00 4/23/2022 06:00 1.00 PROD1, WHPST PULD T Flow check 30min no flow // Lay down BHA#1 window mill assembly// 77.0 0.0 4/23/2022 06:00 4/23/2022 10:45 4.75 PROD1, WHPST WAIT T Found cracks in the reel // Performed welding to fix cracks // check hub bolts 0.0 0.0 4/23/2022 10:45 4/23/2022 11:45 1.00 PROD1, WHPST PULD T PJSM // Pick up BHA# 2 WS setting assembly 0.0 75.0 4/23/2022 11:45 4/23/2022 14:00 2.25 PROD1, WHPST TRIP T RIH with WS 75.0 9,180.0 4/23/2022 14:00 4/23/2022 14:06 0.10 PROD1, WHPST DLOG T Log K1 for -7' correction 9,180.0 9,220.0 4/23/2022 14:06 4/23/2022 14:30 0.40 PROD1, WHPST TRIP T RIH to 9781.18' set WS on Depth 3510 pp 1185 Diff 4.8 DHWOB // Set down 5.84 DHWOB WS set 9,220.0 9,770.0 4/23/2022 14:30 4/23/2022 16:15 1.75 PROD1, WHPST TRIP T POOH for window mill assembly // Perform flow check 9,770.0 70.0 4/23/2022 16:15 4/23/2022 16:57 0.70 PROD1, WHPST PULD T Lay down BHA# 2 WS setting tool 70.0 0.0 4/23/2022 16:57 4/23/2022 17:39 0.70 PROD1, WHPST PULD T PU BHA# 3 Window milling assembly *** 2.80" go 2.79" no for both reamer and DSM 0.0 77.2 4/23/2022 17:39 4/23/2022 19:27 1.80 PROD1, WHPST TRIP T RIH w window milling assembly 72.0 9,180.0 4/23/2022 19:27 4/23/2022 19:36 0.15 PROD1, WHPST DLOG T Tie into the K1 for -7.5' correction - PU Wt 37 k lbs 9,180.0 9,211.4 4/23/2022 19:36 4/23/2022 19:42 0.10 PROD1, WHPST TRIP T RIH and dry tag TOWS @ 9769.8' WOB 4.38 k lbs. PU 38 k lbs 9,211.4 9,768.7 4/23/2022 19:42 4/24/2022 00:00 4.30 PROD1, WHPST WPST P PU and set rate OA 13 psi, IA 0 psi, CT 4096 psi, @ 1.8 bpm in and 1.8 bpm out, BHP 3,780 psi, free spin diff 673 psi, CT RIH Wt 14.8 k lbs, Mill exit window W CT 14 k lbs and WOB 1.6 k lbs 9,768.7 9,771.7 4/24/2022 00:00 4/24/2022 09:30 9.50 PROD1, WHPST WPST P Continue to mill 2.80" exit window @ 9772 increase WOB target, CT 13.7 k lbs, WOB 2.8 k WOB Stall @ 9773.4' PU 36 k lbs, restart OA 20 psi, IA 0 psi, CT 4,065 psi @ 1.80 bpm in and out, free sping 661 psi, BHP 3,767 psi, CT Wt 13.8 k lbs WOB 1.7 k lbs Window Exit 9774.2 Mill Rat hole to 9790 9,771.7 9,790.0 4/24/2022 09:30 4/24/2022 11:00 1.50 PROD1, WHPST REAM P Ream window per plan 30L , 30R, 180R // Dry Drift Clean // 9,790.0 9,790.0 4/24/2022 11:00 4/24/2022 13:00 2.00 PROD1, WHPST TRIP P POOH for Build assembly 9,790.0 77.0 4/24/2022 13:00 4/24/2022 14:00 1.00 PROD1, WHPST PULD P PJSM, Pressure Un-deploy BHA# 3 window mill assembly // Mill out 2.80 go 2.79 NG 77.0 0.0 4/24/2022 14:00 4/24/2022 15:00 1.00 PROD1, WHPST CTOP P Flush Stack 0.0 0.0 4/24/2022 15:00 4/24/2022 16:00 1.00 PROD1, DRILL PULD P Pressure Deploy BHA# 4 Build Assembly 0.0 78.0 Rig: NABORS CDR3-AC RIG RELEASE DATE 5/14/2022 Continue to mill 2.80" exit window @ 9772 increase , Mill exit window RIH to 9781.18' set WS Page 4/20 1B-14 Report Printed: 5/31/2022 Operations Summary (with Timelog Depths) Job: DRILLING SIDETRACK Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 4/24/2022 16:00 4/24/2022 18:24 2.40 PROD1, DRILL TRIP P RIH w/ BHA# 4 Build Assembly extreme 2.4° ako w/ HCC re-run dynamus bit Saw SSSV, and most of the jewelry on the trip in 78.0 9,180.0 4/24/2022 18:24 4/24/2022 18:36 0.20 PROD1, DRILL DLOG P Tie into the K1 for a -6.5' correction - PU Wt 37 k lbs 9,180.0 9,196.0 4/24/2022 18:36 4/24/2022 18:42 0.10 PROD1, DRILL TRIP P RIH, Window clean 9,196.0 9,791.0 4/24/2022 18:42 4/25/2022 00:00 5.30 PROD1, DRILL DRLG P Set rate - OA 20 psi, IA 0 psi, CT 4,335 psi @ 1.82 bpm in & out. Free spin 620 psi, BHP 4053 psi - CT RIH Wt 14 k lbs, OBD CT Wt 13.3 k lbs, WOB 1.5 - ROP 90 ft/hr 9,791.0 10,063.0 4/25/2022 00:00 4/25/2022 01:48 1.80 PROD1, DRILL DRLG P OBD OA 25 psi, IA 0 psi, CT 4,335 psi @ 1.81 bpm in 1.75 bpm out. Free spin 524 psi, BHP 4205 psi. 11.79 ppg ECD at the window , 11.83 ppg EMW at the bit. Pump TD sweeps Ankerite stringers with low ROP towards TD Average DGL's in build 48.79 ° max TVD 6570.8' 10,063.0 10,125.0 4/25/2022 01:48 4/25/2022 03:54 2.10 PROD1, DRILL TRIP P PU Wt 38 k lbs. Pull through window - clean. Park and open EDC. Continue to POOH pumping 2.24 bpm 10,125.0 72.0 4/25/2022 03:54 4/25/2022 05:00 1.10 PROD1, DRILL PULD P PUD BHA #4, build drilling assembly, Bit Graded out at 2-1-BT-N-X-I-CT-BHA 72.0 0.0 4/25/2022 05:00 4/25/2022 06:30 1.50 PROD1, DRILL PULD P PD BHA #5, ERD lateral drilling assembly, NOV agitator, 0.5 ° AKO motor, Dynamus bit. Skid cart, stab injector, bump up and set counters. 0.0 78.0 4/25/2022 06:30 4/25/2022 09:15 2.75 PROD1, DRILL TRIP P RIH w BHA #5 // Tie in - 5.5' correction // 33K pick up // Stack out 10000 78.0 10,000.0 4/25/2022 09:15 4/25/2022 10:45 1.50 PROD1, DRILL REAM P Clean up build section back to the window 10,000.0 10,125.0 4/25/2022 10:45 4/25/2022 13:45 3.00 PROD1, DRILL CTOP T Pull to shoe to weld cracks in reel 10,125.0 9,770.0 4/25/2022 13:45 4/25/2022 14:15 0.50 PROD1, DRILL TRIP T RIH to bottom 9,770.0 10,125.0 4/25/2022 14:15 4/25/2022 16:30 2.25 PROD1, DRILL DRLG P OBD F/ 10125 T/ 10500 1.8 BPM , 4680 pp , 700 diff , 4120 Ann MW in 8.65 MW out 8.71 10,125.0 10,500.0 4/25/2022 16:30 4/25/2022 17:00 0.50 PROD1, DRILL WPRT P Wiper to end of build and back to bottom 10,500.0 10,500.0 4/25/2022 17:00 4/25/2022 19:15 2.25 PROD1, DRILL DRLG P BOBD F/ 10500 T/ 10925 1.8 bp , 4980 pp , 800 diff , Ann 4266 MW in 8.67 MW out 8.81 10,500.0 10,925.0 4/25/2022 19:15 4/25/2022 19:45 0.50 PROD1, DRILL WPRT P Wiper trip 5 X 5 sweeps, wiper to 10130' 10,925.0 10,130.0 4/25/2022 19:45 4/25/2022 20:00 0.25 PROD1, DRILL TRIP P Trip to bottom 10,130.0 10,925.0 4/25/2022 20:00 4/26/2022 00:00 4.00 PROD1, DRILL DRLG P BOBD F/ 10925 T/ 11,184 1.8 bp , 5114 pp , 850 diff , Ann 4292 MW in 8.67 MW out 8.79 ** Ankerite 11,175' - 10,925.0 11,184.0 Rig: NABORS CDR3-AC RIG RELEASE DATE 5/14/2022 OBD Page 5/20 1B-14 Report Printed: 5/31/2022 Operations Summary (with Timelog Depths) Job: DRILLING SIDETRACK Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 4/26/2022 00:00 4/26/2022 05:42 5.70 PROD1, DRILL DRLG P pump 5x5, short BHA PU to above ankerite, RBIH, WH 160 psi, OA 33 psi, IA 0 psi, CT 5091 psi, @ 1.83 bpm in and 1.81 bpm out. BHP 4318 psi, Free spin 760 psi, RIH CT Wt 10.4 k lbs, OBD CT wt 7 k lbs, ** broke out of Ankerite ~ 11,210' **More Ankerite ~11,277' - 11,285' 11,184.0 11,345.0 4/26/2022 05:42 4/26/2022 07:18 1.60 PROD1, DRILL WPRT P PU Wt 35 k lbs, PUH on long wiper to window for tie in.] Chase 5x5 sweeps x2 Motor work, over pulls 9,950, 9,940, 9,856'. Chase additional sweeps jog build x2 - attempt to clean up area - large amount of cuttings at shaker **Build falling apart, 1 bbl cuttings returned on the trip. 11,345.0 9,790.0 4/26/2022 07:18 4/26/2022 07:30 0.20 PROD1, DRILL WPRT P Tie into the K1 for a +6' correction 9,790.0 9,815.0 4/26/2022 07:30 4/26/2022 08:06 0.60 PROD1, DRILL WPRT P RBIH, WOB spikes to 2.6 k lbs and motor work 9,877-9,997' and again @ 10,052'. 9,815.0 11,345.0 4/26/2022 08:06 4/26/2022 11:48 3.70 PROD1, DRILL DRLG P WH 178 psi, CT 4935 psi @ 1.80 in & out, BHP 4192 psi, Free spin diff 755 psi. RIH Wt 10 k lbs, OBD - CT Wt 7 k lbs, WOB 2 k lbs, ** Mud swap, new mud at the bit11,473' PU 40 k lbs, harvest new parameters once new mud all at surface WH 415 psi, CT 4374 psi @ 1.83 in & out. BHP 4,134 psi, Free spin diff 755 psi, 11.8 ppg EMW @ the window and 12. 1 ppg at the bit. CT 5 k lbs, WOB 3 k lbs 11,345.0 11,540.0 4/26/2022 11:48 4/26/2022 12:48 1.00 PROD1, DRILL WPRT P PU Wt 36 k lbs, PUH pumping sweeps Overpulls, and motor work in the build, had to turn around, 9,860, 9,956, 9,944' 11,540.0 9,797.0 4/26/2022 12:48 4/26/2022 13:42 0.90 PROD1, DRILL WPRT P RBIH Set down an stacked out @ 9956, 9959, and 9966. 0.8 bbls solids returned on the trip 9,797.0 11,540.0 4/26/2022 13:42 4/26/2022 17:00 3.30 PROD1, DRILL DRLG P WH 409 psi, IA 0 psi, OA 30 psi, CT 4377 psi @ 1.80 bpm in and 1.78 bpm out, BHP 4171 psi, Free spin diff 733 psi, Ct Wt 7 k lbs, WOB 2.6 k lbs 11,540.0 11,686.0 4/26/2022 17:00 4/26/2022 18:00 1.00 PROD1, DRILL DRLG P OBD, 1.8 bpm/4,582 psi/Diff 781 psi, WHP 428, BHP 4,192, IA 0, OA 33 Avg ROP 60 fph 11,686.0 11,720.0 4/26/2022 18:00 4/26/2022 20:00 2.00 PROD1, DRILL DRLG P OBD, 1.81 bpm/4,571 psi/Diff 829 psi, WHP 421, BHP 4,195, IA 0, OA 33 Avg ROP 15 fph 11,720.0 11,773.0 4/26/2022 20:00 4/26/2022 22:00 2.00 PROD1, DRILL DRLG P OBD, 1.81 bpm/4,641 psi/DIff 890 psi, WHP 383, BHP 4,201, IA 0, OA 39 Avg ROP 30 fph 11,773.0 11,813.0 4/26/2022 22:00 4/27/2022 00:00 2.00 PROD1, DRILL DRLG P OBD, 1.81 bpm/4,708 psi/Diff 925 psi, WHP 348, BHP 4,228, IA 0, OA 41 11,813.0 11,872.0 4/27/2022 00:00 4/27/2022 00:45 0.75 PROD1, DRILL DRLG P OBD, 1.81 bpm/4,708 psi/Diff 925, WHP 348, BHP 4,228, IA 0, OA 41 11,872.0 11,887.0 4/27/2022 00:45 4/27/2022 03:15 2.50 PROD1, DRILL DRLG P BHA wiper Restart using anti bit balling technique 1.80 bpm/4,711 psi/Diff 902, WHP 375, BHP 4,217, IA 0, OA 43 11,887.0 11,941.0 Rig: NABORS CDR3-AC RIG RELEASE DATE 5/14/2022 Page 6/20 1B-14 Report Printed: 5/31/2022 Operations Summary (with Timelog Depths) Job: DRILLING SIDETRACK Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 4/27/2022 03:15 4/27/2022 03:51 0.60 PROD1, DRILL DRLG P BHA wiper Perform anti bit balling technique Restart 1.82 bpm/4,606 psi/Diff 800 psi, WHP 336, BHP 4,183, IA 0, OA 48 11,941.0 11,943.0 4/27/2022 03:51 4/27/2022 04:09 0.30 PROD1, DRILL WPRT P Wiper #1 up hole 800', PUW 36 k 1.81 bpm/4,580 psi/Diff 775 psi 11,943.0 11,143.0 4/27/2022 04:09 4/27/2022 04:39 0.50 PROD1, DRILL WPRT P Wiper back in hole, RIW 5k 11,143.0 11,943.0 4/27/2022 04:39 4/27/2022 06:15 1.60 PROD1, DRILL DRLG P BOBD, 1.8 bpm/4,600 psi/Diff 770 psi, WHP 345., BHP 4,219, IA 0, OA 49 11,943.0 11,955.0 4/27/2022 06:15 4/27/2022 10:00 3.75 PROD1, DRILL DRLG P PU and gather parameters after crew change. OA 53 psi, IA 0 psi, WH 353 psi, CT 4706 psi @ 1.83 bpm in and 1.80bpm out, BHP 4,203 psi, Free spin diff 788 psi, 11.8 ppg ECD at the window, 12.38 ppg EMW at the bit. CT Wt -4 k lbs, WOB 1.4 - 2.2 k lbs Bypass high pressure screens - ad 1 ppb alpine beads to High Vis sweep Pumping 5x5 low/high sweeps - not much effect on weight transfer. Drilling 90-100 API rock with low res and low ROP ** Geos called TD early 11,955.0 12,088.0 4/27/2022 10:00 4/27/2022 12:15 2.25 PROD1, DRILL TRIP P PU Wt 41 k lbs, PUH to 11,200 while pumping TD sweeps Slow pulling speed to allow 10 by 10 low vis/high vis to exit coil PUH on swab wiper at 35 ft/hr, rotate motor to drag low side. 5x5 exit the bit @ EOB 10,125' continue to drag low side Roll high side @ 9,954' saw motor work and neg WOB at same spots ( 9,950, 9,940, 8,950). Make multiple passes, allow another 5x5 sweep to exit prior to pulling through window - window clean 12,075.0 9,697.0 4/27/2022 12:15 4/27/2022 14:30 2.25 PROD1, DRILL TRIP P Continue out of hole chasing additional 5x5 sweep surface to surface. Jog tubing near surface, continue OOH - Bump up and set counters 9,697.0 77.0 4/27/2022 14:30 4/27/2022 16:15 1.75 PROD1, DRILL TRIP P RBIH 77.0 9,190.0 4/27/2022 16:15 4/27/2022 16:27 0.20 PROD1, DRILL DLOG P Tie into the K1 for a -7.5 correction, PU Wt 35 k lbs. 9,190.0 9,203.7 4/27/2022 16:27 4/27/2022 16:39 0.20 PROD1, DRILL DLOG P Verify kill weight. Park at 9742.33 MD and TVD6557.33 Trap 11.8 ppg EMW - 4052 psi with the choke and observe pressure fall to 4011 psi - 11.76 ppg EMW. Back on the pump holding 11.8 ppg EMW 9,203.7 9,742.3 4/27/2022 16:39 4/27/2022 19:09 2.50 PROD1, DRILL DISP P Build weighted liner running pill. 9,742.0 9,742.0 4/27/2022 19:09 4/27/2022 20:39 1.50 PROD1, DRILL DISP P RIH to liner TD depth, pump LRP to bit *** Note: Set down x 2 @ 10,051', Bring pump rate to 0.5 bpm/Speed 50 fpm, popped through, continue IH 9,742.0 11,100.0 4/27/2022 20:39 4/27/2022 23:51 3.20 COMPZ1, CASING TRIP P POOH laying in LRP and KW to surface while painting flags. Pumping 1.24 bpm/2,808 psi 11,100.0 79.3 4/27/2022 23:51 4/28/2022 00:00 0.15 COMPZ1, CASING OWFF P Check well for flow 79.3 79.3 Rig: NABORS CDR3-AC RIG RELEASE DATE 5/14/2022 11,100.0RIH to liner TD depth, 12,088.0 Page 7/20 1B-14 Report Printed: 5/31/2022 Operations Summary (with Timelog Depths) Job: DRILLING SIDETRACK Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 4/28/2022 00:00 4/28/2022 01:00 1.00 COMPZ1, CASING BHAH P LD tools over a dead well 79.3 0.0 4/28/2022 01:00 4/28/2022 01:45 0.75 COMPZ1, CASING PUTB P Prep RF for liner OPS, PJSM Static loss rate 0.5 an hour 0.0 0.0 4/28/2022 01:45 4/28/2022 04:15 2.50 COMPZ1, CASING PUTB P PU A Lateral liner segment w/3 blank, 40 slotted, shorty deployment sleeve 0.0 1,324.7 4/28/2022 04:15 4/28/2022 04:45 0.50 COMPZ1, CASING BHAH P PU BHI CoilTrak tools, perform surface test (good) Stab INJH, check pack offs - replace, reset counter depths 1,324.7 1,368.4 4/28/2022 04:45 4/28/2022 08:45 4.00 COMPZ1, CASING RUNL P RIH, tie into white window flag for -6.8' correction, PU Wt 36 k lbs, -4.17 k lbs WOB SD @ 10,052.6' PU once and pop through, Drive by K1 for a -2' correction - note did not park to reset depth Continue in hole - SD multiple times, work pipe to bottom, Max PU Wt 56 k lbs, Land on depth with neutral coil weight 16.9 k lbs Pump 1.4 bpm , 1k diff PU Wt 33 k lbs *** TOL 9770' 1,368.4 11,096.7 4/28/2022 08:45 4/28/2022 09:00 0.25 COMPZ1, CASING TRIP P PUH, park, reset counters, PUH to logging depth 11,096.7 9,155.0 4/28/2022 09:00 4/28/2022 09:12 0.20 COMPZ1, CASING DLOG P Log the K1 for a plus 1+ correction *** TOWS corrected depth 9771' 9,155.0 70.0 4/28/2022 09:12 4/28/2022 10:45 1.55 COMPZ1, CASING TRIP P POOH with liner running BHA # 6 9,155.0 70.0 4/28/2022 10:45 4/28/2022 11:45 1.00 COMPZ1, CASING PULD P Park short, open stack to half drum, OWFF - dead well, top off with C pump, PJSM, LD BHA #6 over a dead well. Inspect pipe, Static losses 0.3bbl in 10 min - 1.8 bph 70.0 0.0 4/28/2022 11:45 4/28/2022 12:09 0.40 COMPZ1, CASING BOPE P Perform BOP function test - Good 0.0 0.0 4/28/2022 12:09 4/28/2022 13:15 1.10 COMPZ1, CASING PULD P PU BHA #7 - Northern Solutions, monocore Whipstock - serial number 1! 0.0 74.9 4/28/2022 13:15 4/28/2022 15:21 2.10 COMPZ1, CASING WPST P RIH with whipstock. 74.9 9,165.0 4/28/2022 15:21 4/28/2022 15:33 0.20 COMPZ1, CASING DLOG P Tie into the K1 for a -6', PU Wt 35 k lbs 9,165.0 9,210.0 4/28/2022 15:33 4/28/2022 15:51 0.30 COMPZ1, CASING WPST P Continue in hole to setting depth. Park at 9761.95' bit depth, tray oriented 330 ROHS, close EDC, Online w pump, setting tool sheered @ 3,000 psi, Stacked 3.57 WOB. Good set ****TOWS set at 9750 tray oriented 330° ROHS 9,210.0 9,761.9 4/28/2022 15:51 4/28/2022 17:36 1.75 COMPZ1, CASING TRIP P POOH 9,761.9 74.9 4/28/2022 17:36 4/28/2022 18:06 0.50 COMPZ1, CASING OWFF P Check well for flow, PJSM 74.9 74.9 4/28/2022 18:06 4/28/2022 19:06 1.00 COMPZ1, CASING BHAH P LD tools over a dead well 74.9 0.0 4/28/2022 19:06 4/28/2022 20:06 1.00 PROD2, RPEQPT BHAH P PU, Window milling assembly BHA #8 Check Pac-off's (good) 0.0 77.2 4/28/2022 20:06 4/28/2022 21:48 1.70 PROD2, RPEQPT TRIP P Tag up, re-set counters, RIH w/Window Milling BHA #8 With 1.25° fixed bend motor w/kick heel 77.2 9,180.0 4/28/2022 21:48 4/28/2022 22:00 0.20 PROD2, RPEQPT DLOG P Log K1 Marker for depth control correction of -4.0' PUW 35 k RIW 16 k 9,180.0 9,225.8 Rig: NABORS CDR3-AC RIG RELEASE DATE 5/14/2022 POOH with liner running At this point Lateral A (1B-14A) was drilled and its liner run. For comments on the 1B-14AL1 lateral, see PDF CPAI_KRU_1B-14AL1. -WCB work pipe to bottom, p SD multiple times, PU A Lateral liner segment w/3 blank,g 40 slotted, shorty deployment sleeve 11,096.7 Page 8/20 1B-14 Report Printed: 5/31/2022 Operations Summary (with Timelog Depths) Job: DRILLING SIDETRACK Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 4/28/2022 22:00 4/28/2022 22:18 0.30 PROD2, RPEQPT TRIP P Continue IH, dry tag pinch point @ 9,750.5' PUW 36 k 9,225.8 9,750.0 4/28/2022 22:18 4/28/2022 23:30 1.20 PROD2, RPEQPT DISP P PUH, function open EDC, displace well to drilling fluid PUW 37 k 9,750.0 9,730.0 4/28/2022 23:30 4/29/2022 00:00 0.50 PROD2, RPEQPT WPST P Pump online 1.83 bpm/4,679 psi/Diff 714 psi, WHP 301, BHP 4,034, IA 0, OA 14 Creep in hole, start milling 9,749.8' 9,730.0 9,750.0 4/29/2022 00:00 4/29/2022 02:00 2.00 PROD2, RPEQPT WPST P OBM, 1.80 bpm/4,731 psi/Diff 824, WHP 295, BHP 4,024, IA 0, OA 15 9,750.0 9,751.0 4/29/2022 02:00 4/29/2022 04:00 2.00 PROD2, RPEQPT WPST P OBM, 1.80 bpm/4,668 psi/Diff 768, WHP 298, BHP 4,019, IA 0, OA 20 9,751.0 9,752.5 4/29/2022 04:00 4/29/2022 08:24 4.40 PROD2, RPEQPT WPST P OBM, 1.83 bpm/4,720 psi/Diff 837, WHP 323, BHP 4037, IA 0, OA 26 9,752.5 9,753.5 4/29/2022 08:24 4/29/2022 14:30 6.10 PROD2, RPEQPT WPST P PU, restart, WH 318 psi, IA o psi, OA 38 psi, CT 4,551 psi @ 1.81 in & out. BHP 4,030 psi, Free spin 665 psi. CT Wt 13 k lbs, WOB - variable ~2 k lbs, ***Mill off @ 9754.61' - Assumed casing exit 9,753.5 9,758.3 4/29/2022 14:30 4/29/2022 16:06 1.60 PROD2, RPEQPT WPST P Milling rat hole from 9758.25 WH 324 psi, IA 0 psi, OA 56 psi, CT 4,865' @ 1.81 in and 1.75, BHP 4034 psi *** @ 9,768' instant loss of 0.4 bpm, losses slowly healed. *** TD rat hole at 9770' 9,758.3 9,770.0 4/29/2022 16:06 4/29/2022 18:06 2.00 PROD2, RPEQPT REAM P Perform reaming passes. Note passes made as milled, up, down and up, while varying turnaround. Returns back to ~ 1 for 1. Launch 10x10 sweeps 9,770.0 9,770.0 4/29/2022 18:06 4/29/2022 20:42 2.60 PROD2, RPEQPT TRIP P POOH 9,770.0 77.2 4/29/2022 20:42 4/29/2022 20:54 0.20 PROD2, RPEQPT BHAH P At surface, spaceout, PJSM 77.2 77.2 4/29/2022 20:54 4/29/2022 21:12 0.30 PROD2, RPEQPT BHAH P Rig crew on location, stop operations, perform crew changeout, valve checklist 77.2 77.2 4/29/2022 21:12 4/29/2022 22:42 1.50 PROD2, DRILL BHAH P PUD window milling assembly *** Note: Mills both gauged 2.79" no-go 77.2 0.0 4/29/2022 22:42 4/30/2022 00:00 1.30 PROD2, DRILL CTOP P MU Nozzle, stab INJH, jet stack x 4 passes, unstab INJH, brake off nozzle, brake off UQC, pumping MP 0.0 0.0 4/30/2022 00:00 4/30/2022 01:36 1.60 PROD2, DRILL CTOP P Install short pup, stab INJH, bring pump online heard wire moving for 42 sec. shut down, bleed pressure, unstab INJH, install nozzle, RU CT Cutter, Run Coil down, cut CTC off, Pumping MP 0.0 0.0 4/30/2022 01:36 4/30/2022 02:48 1.20 PROD2, DRILL CTOP P Trim Coiled Tubing, broke welds on cutter, RD cutter, started hand cutting,found e-line @ 90' cut, make additional/final hand cut for CTC. Pumping MP 0.0 0.0 4/30/2022 02:48 4/30/2022 03:33 0.75 PROD2, DRILL CTOP P Dress coil, install CTC, Pull Test 35 k Pumping MP 0.0 0.0 4/30/2022 03:33 4/30/2022 04:03 0.50 PROD2, DRILL CTOP P Re-head BHI Upper Quick Connect Pumping MP 0.0 0.0 4/30/2022 04:03 4/30/2022 04:45 0.70 PROD2, DRILL CTOP P PT CTC and BHI Upper Quick 4,000 psi Pumping MP 0.0 0.0 Rig: NABORS CDR3-AC RIG RELEASE DATE 5/14/2022 Page 9/20 1B-14 Report Printed: 5/31/2022 Operations Summary (with Timelog Depths) Job: DRILLING SIDETRACK Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 4/30/2022 04:45 4/30/2022 07:45 3.00 PROD2, DRILL PULD P PJSM, PD Build Assembly BHA #9, BHA stacked out in tree on first attempt, popped off and rolled big bend motor 180°, Crew change. BHA stacked out again, briefly hung up in tree. Popped off, re indexed bi-center bit, greased kick plat on AKO motor, reattempt and BHA slid in smoothly. Complete PD BHA #9, 2.5 ° AKO motor with HCC dynamus bit. Inspect Pack offs - good, STab injector, tag up, set counters. 0.0 72.2 4/30/2022 07:45 4/30/2022 08:09 0.40 PROD2, DRILL CTOP P Line up and pump slack forward to 3.8 bpm. Could not hear wire move after multiple ramps. 72.2 72.2 4/30/2022 08:09 4/30/2022 10:06 1.95 PROD2, DRILL TRIP P RIH w BHA #8- build drilling assembly 72.2 9,160.0 4/30/2022 10:06 4/30/2022 10:15 0.15 PROD2, DRILL DLOG P Log K1 marker for depth control, correction of -5.5', PU Wt 33 k lbs 9,160.0 9,182.0 4/30/2022 10:15 4/30/2022 10:27 0.20 PROD2, DRILL TRIP P Continue in hole, park near window, close EDC, PU Wt 35 k lbs. RIH through Window - clean Bring pump up to drill rate, obtain pumping parameters 9,182.0 9,770.0 4/30/2022 10:27 4/30/2022 16:30 6.05 PROD2, DRILL DRLG P BHA getting in a bind a little through the window, Pick up and restart as necessary. WH 306 psi, IA 26 psi, OA 0 psi, CT 4,482 psi @ 1.84 bpm in and 1.80 bpm out, BHP 4,058 psi, Free spin 558 psi, CT RIH wt 12.8 ppg, OBD CT Wt 9.8 k lbs, WOB 2.5 k lbs, 11.8 ppg EMW at the window, 11.84 ppg at the bit. 9,770.0 10,060.0 4/30/2022 16:30 4/30/2022 18:00 1.50 PROD2, DRILL DRLG P OBD - WH 262 psi, IA 0 psi, OA 36 psi, CT 4594 psi @ 1.83 bpm in and 1.81 bpm out, BHP 4094 psi, Drilled into lower ROP, some clay balls at the shaker starting at 10,050. 9,770.0 10,068.0 4/30/2022 18:00 4/30/2022 20:00 2.00 PROD2, DRILL DRLG P OBD, 1.82 bpm/4,583 psi/Diff 679, WHP 262, BHP 4,096, IA 0, OA 40 10,068.0 10,097.0 4/30/2022 20:00 4/30/2022 22:45 2.75 PROD2, DRILL DRLG P OBD, 1.82 bpm/4,601 psi/Diff 651, WHP 265, BHP 4,103, IA 0, OA 46 10,097.0 10,150.0 4/30/2022 22:45 4/30/2022 23:03 0.30 PROD2, DRILL TRIP P TD build section 10,150', PUW 37 k, chase sweeps to the window 10,150.0 9,750.0 4/30/2022 23:03 5/1/2022 00:00 0.95 PROD2, DRILL TRIP P POOH, Open EDC @ 9,731', continue POOH Pumping 2.0 bpm/4,537' 9,750.0 5,041.0 5/1/2022 00:00 5/1/2022 01:00 1.00 PROD2, DRILL TRIP P Continue POOH 5,041.0 72.2 5/1/2022 01:00 5/1/2022 02:12 1.20 PROD2, DRILL BHAH P At surface, spaceout, PUD build assembly 72.2 0.0 5/1/2022 02:12 5/1/2022 03:54 1.70 PROD2, DRILL BHAH P PD AL Lateral drilling assembly BHA #10 w/0.5 ako motor and Hycalog bit Perform CoilTrak surface test (good) 0.0 78.3 5/1/2022 03:54 5/1/2022 05:36 1.70 PROD2, DRILL TRIP P Tag up, re-set counters, RIH Test Agitator and motor @ 500', 1.82 bpm/4,960 psi/Diff 890 psi 78.3 9,170.0 5/1/2022 05:36 5/1/2022 05:48 0.20 PROD2, DRILL DLOG P Log the K1 marker for depth control correction of -6' correction, PU Wt 37 k lbs 9,170.0 9,207.2 5/1/2022 05:48 5/1/2022 06:12 0.40 PROD2, DRILL DLOG P Continue IH, set down once in window, misscomunication, had slowed early to 5 ft/minute to log RA tag, PU 37 k lbs, RBIH through window clean Log RA tag in WS - 9754' 9,207.2 9,807.0 Rig: NABORS CDR3-AC RIG RELEASE DATE 5/14/2022 Page 10/20 1B-14 Report Printed: 5/31/2022 Operations Summary (with Timelog Depths) Job: DRILLING SIDETRACK Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 5/1/2022 06:12 5/1/2022 06:42 0.50 PROD2, DRILL TRIP P Continue in hole through build, - 9,807.0 10,150.0 5/1/2022 06:42 5/1/2022 08:06 1.40 PROD2, DRILL DRLG P Set rate, Drill ahead in fast sand, Discovered a small weep on Pump #1 walk around, PU Wt 37 k lbs, slow roll up hole, flushed OH with fresh mud, swapped to Pump #2. RBIH, set rate again. WH 164 psi, IA 0 psi, OA 21 psi, CT 4,883 psi At 1.81 in and 1.80 bpm out - BHP 4,111 psi, free spin 963 psi - OBD CT Wt 10 k lbs, WOB 1 k lbs Swap mud, Fast sand until striking Ankerite @ 10,266' **Ankerite @ 10,266' *** New mud at the bit 10,272 psi 10,150.0 10,272.0 5/1/2022 08:06 5/1/2022 12:18 4.20 PROD2, DRILL DRLG P PU to collect parameters with new mud all the way around. PU Wt 36 k lbs. WH 440 psi, IA 0 psi, OA 21 psi, CT 4,524 psi @ 1.82 bpm in & out. BHP 4,163 psi, 11.8 pg EMW at the window - 11.9 ppg at the bit. Free spin diff - 870 psi. CT Wt 10.9 k lbs, WOB 2.3 k lbs - in Ankerite - ROP ~ 10 reducing to 2 ft/hr. 8.62 ppg in and 8.71 ppg out. ~5.8 ft/hr 10,272.0 10,295.0 5/1/2022 12:18 5/1/2022 14:36 2.30 PROD2, DRILL DRLG P PU - 36 k lbs, RBIH WH 497 psi, IA 0 psi, OA 20 psi, CT 4518 psi @ 1.83 bpm in 1.83 bpm out, BHP 4094 psi Free spin 852 psi. OBD CT Wt 12 k lbs, WOB 2.7 k lbs. 10,295.0 10,305.0 5/1/2022 14:36 5/1/2022 17:42 3.10 PROD2, DRILL DRLG P Broke out of Ankerite 10,305' WH 448 psi, CT 4,609 psi, BHP 4,105 psi, CT Wt 10 k lbs, WOB 2 k lbs. ROP 80-96 ft/min 10,305.0 10,573.0 5/1/2022 17:42 5/1/2022 18:00 0.30 PROD2, DRILL WPRT P PU Wt 39 k lbs PUH on wiper #1 10,573.0 9,780.0 5/1/2022 18:00 5/1/2022 18:18 0.30 PROD2, DRILL WPRT P Wiper back in hole, RIW 10 k 9,780.0 10,573.0 5/1/2022 18:18 5/1/2022 20:18 2.00 PROD2, DRILL DRLG P BOBD, 1.85 bpm/4,623 psi/DIff 917, WHP 316, BHP 4,095, IA 0, OA 31 10,573.0 10,652.0 5/1/2022 20:18 5/1/2022 21:54 1.60 PROD2, DRILL DRLG P OBD, 1.83 bpm/4,779 psi/Diff 1,017, WHP 426, BHP 4,134, IA 0, OA 35 10,652.0 10,725.0 5/1/2022 21:54 5/1/2022 22:18 0.40 PROD2, DRILL WPRT P PUH BHA Wiper, PUW 38 k CTSW Attempt to fire up pump #1 after service Reset PFD Success bringing pump #1 online Stay on pump and observe, RBIH to drill 10,725.0 10,725.0 5/1/2022 22:18 5/2/2022 00:00 1.70 PROD2, DRILL DRLG P BOBD, 1.8 bpm/4,671 psi/Diff 866, WHP 333, BHP 4,145, IA 0. OA 40 10,725.0 10,825.0 5/2/2022 00:00 5/2/2022 03:36 3.60 PROD2, DRILL DRLG P OBD, 1.85 bpm/4,856 psi/Diff 1001, WHP 320, BHP 4,156, IA 0, OA 45 10,825.0 11,000.0 5/2/2022 03:36 5/2/2022 03:42 0.10 PROD2, DRILL WPRT P PU on scheduled wiper #2 CT Wt 39 k lbs break over. CT Wt climbed to 42-43 k lbs while PUH. 11,000.0 10,780.0 5/2/2022 03:42 5/2/2022 03:54 0.20 PROD2, DRILL WPRT P CT Wt climbed to 47 k lbs, neg WOB tugs to -2.8 k lbs, Some minor pack off events and motor work, slow pulling speed across trouble interval ** Trouble spot 10,600 - 10,780' 10,780.0 10,600.0 5/2/2022 03:54 5/2/2022 04:06 0.20 PROD2, DRILL WPRT P Continue to PUH on wiper #2 10,600.0 10,201.0 Rig: NABORS CDR3-AC RIG RELEASE DATE 5/14/2022 Page 11/20 1B-14 Report Printed: 5/31/2022 Operations Summary (with Timelog Depths) Job: DRILLING SIDETRACK Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 5/2/2022 04:06 5/2/2022 04:30 0.40 PROD2, DRILL WPRT T RBIH, - Stacking out, WOB to 4 k lbs, Pick ups, CT Wt to 55 k lbs ** Stacking out at 10,817' 10,201.0 10,817.0 5/2/2022 04:30 5/2/2022 04:54 0.40 PROD2, DRILL WPRT T PUH to 10,290' 10,817.0 10,290.0 5/2/2022 04:54 5/2/2022 05:24 0.50 PROD2, DRILL WPRT T Attempt to RBIH, Stack out multiple times 10,668 - 10,660', Work down hole to 10,978, Stacked out, unable to RIH 10,290.0 10,978.0 5/2/2022 05:24 5/2/2022 06:06 0.70 PROD2, DRILL WPRT T PUH, Pulling heavy 10,900 - 10,660' CT Wt to 57 k lbs, CT neg WOB to -5 k, packing off, motor work. - hole falling apart. 10,978.0 10,169.0 5/2/2022 06:06 5/2/2022 08:48 2.70 PROD2, DRILL WPRT T Work pipe up hole chasing 10 x 10 and multiple 5x 5 sweeps cleaning hole on the trip. Encountered motor work, over pulls, packing off, trouble turning around from 10,030 to 9,950'. Large amount of fine cuttings at the shaker, Cuttings ration increasing rapidly, more than 1 bbl cuttings returned on the trip thus far. Jog build multiple times with sweeps, pull through the window - clean. 10,169.0 9,696.0 5/2/2022 08:48 5/2/2022 10:06 1.30 PROD2, DRILL WPRT T Pump ~15 bbl's clean mud while pulling slowly, park, open EDC, on the pump @ 2.3 bpm. After10 minutes heavy slug of rocks, cuttings, clay balls returned to the shaker, MW out to 10.4 from 8.8 ppg. A river of pea gravel returned to the shaker. Pumped additional 5x5 sweep, while RBIH jogging the tubing. Sweep exited 995 no rocks, still significant cuttings. PUH slowly monitoring returns at the shaker. 9,696.0 9,721.0 5/2/2022 10:06 5/2/2022 12:42 2.60 PROD2, STK TRIP T Clean returns at the shaker, increase pulling speed, POOH for billet. 9,721.0 78.0 5/2/2022 12:42 5/2/2022 13:54 1.20 PROD2, STK PULD T Bumped up, spaced out, PJSM, PUD BHA # 10, drilling assembly In parallel replaced both seat and tip on drilling choke A Replaced the seat on drilling choke B ***returned 3.16 bbls on the trip. 78.0 0.0 5/2/2022 13:54 5/2/2022 16:00 2.10 PROD2, STK PULD T Reconfigure BHA - PD BHA #11 - Open Hole Anchored Billet (OHAB). Bump up, set counters, Billet 9.28', open hole anchors 2.75' LOA 12.03' - anchors approx 11' down from top of billet. 0.0 73.0 5/2/2022 16:00 5/2/2022 17:24 1.40 PROD2, STK TRIP T RIH with BHA # 11 OHAB, discover inner reel iron hard line rubber leaking on 3" to 2" 1502 swage. Isolate and bleed coil, check holding, tighten wing, leak not repaired. 73.0 3,010.0 5/2/2022 17:24 5/2/2022 18:06 0.70 PROD2, STK TRIP T POOH with BHA #11 3,010.0 73.0 5/2/2022 18:06 5/2/2022 19:00 0.90 PROD2, STK PULD T PUD BHA #11 partially, un stab injector to inspect inner reel iron while pumping managed pressure. Hard line rubber frayed and damaged. Pull BHA into DS PDL and close swab, line up pumping managed pressure. 73.0 0.0 5/2/2022 19:00 5/3/2022 00:00 5.00 PROD2, STK CTOP T Remove wire from high pressure bulk head, repair hard line rubber, reinstall wire in high pressure bulkhead. Pressure test inner reel iron. 0.0 0.0 Rig: NABORS CDR3-AC RIG RELEASE DATE 5/14/2022 Page 12/20 1B-14 Report Printed: 5/31/2022 Operations Summary (with Timelog Depths) Job: DRILLING SIDETRACK Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 5/3/2022 00:00 5/3/2022 02:00 2.00 PROD2, STK CTOP T Reinstall wire in high pressure bulkhead. Test E-line (bad test), brake bulkhead apart, clean and reconnect wires, re-test bulkhead (good test) Pressure test inner reel iron. 0.0 0.0 5/3/2022 02:00 5/3/2022 02:12 0.20 PROD2, STK CTOP T PT, connection and bulkhead inside reel 4,750 psi (good test) 0.0 0.0 5/3/2022 02:12 5/3/2022 03:30 1.30 PROD2, STK BHAH T PD OH Anchored Billet Assembly BHA #12 0.0 73.0 5/3/2022 03:30 5/3/2022 04:00 0.50 PROD2, STK TRIP T Tag up, re-set counters, RIH @ 80 FPM as per BOT rep, with OH Anchored billet Confirm EDC open, bring pump online 0.3 bpm/1,958 psi/Diff 0 73.0 3,010.0 5/3/2022 04:00 5/3/2022 05:12 1.20 PROD2, STK TRIP T Continue IH 3,010.0 9,180.0 5/3/2022 05:12 5/3/2022 05:24 0.20 PROD2, STK DLOG T Log the K1 for depth control correction of 6.5' 9,180.0 9,209.2 5/3/2022 05:24 5/3/2022 06:00 0.60 PROD2, STK TRIP T Continue IH PUW 34 k CTSW Function closed EDC Announce DO NOT PUMP until on depth 1k Weight bobble @ 9,901' 2.2k Weight bobble @ 9,982' 9,209.2 10,412.0 5/3/2022 06:00 5/3/2022 06:12 0.20 PROD2, STK TRIP T At setting depth 10,412.03', PU to neutral weight 10,410' Bring pump online @ 0.4 bpm pressuring up to shear 4,200 psi Set down 3.3 k/1,100 lbs 10,412.0 10,400.0 5/3/2022 06:12 5/3/2022 08:24 2.20 PROD2, STK TRIP T POOH 10,400.0 73.0 5/3/2022 08:24 5/3/2022 09:36 1.20 PROD2, STK BHAH T At surface, tag up,space out, PUD 73.0 0.0 5/3/2022 09:36 5/3/2022 10:54 1.30 PROD2, STK BHAH T PD, drilling assembly BHA #13 0.0 78.3 5/3/2022 10:54 5/3/2022 12:30 1.60 PROD2, STK TRIP T Tag up, re-set counter depths, RIH 78.3 9,180.0 5/3/2022 12:30 5/3/2022 12:42 0.20 PROD2, STK DLOG T Log K1 marker correction of -6.0' PUW 34 k CTSW 9,180.0 9,191.0 5/3/2022 12:42 5/3/2022 13:27 0.75 PROD2, STK TRIP T Continue IH Dry tag TOB @ 10401' 9,191.0 10,401.0 5/3/2022 13:27 5/3/2022 13:57 0.50 PROD2, STK KOST T Bring pump online 1.8 bpm/4,968 psi/Diff 860, WHP 122, BHP 4,315, IA 0, OA 12 Packing off, right before seeing billet, PUH, PUW 40 k and then started pulling 50-60 k CTSW with negaive weight on bit. Continue trying to pull to window 9,993' 10,401.0 9,730.0 5/3/2022 13:57 5/3/2022 15:57 2.00 PROD2, STK WPRT T Continue pulling to the window PUW 40-60 k CTSW, 0 to -4.6k DHWOB Pull through window clean Launch muliple sweeps and job above window Confer with town team on plan forward 9,730.0 9,400.0 5/3/2022 15:57 5/3/2022 16:57 1.00 PROD2, STK CIRC T Hesitate for additional sweeps to be built Launch 5x5 sweep with second 5x5 with 10 bbl spacer. 9,400.0 9,820.0 5/3/2022 16:57 5/3/2022 17:39 0.70 PROD2, STK CIRC T RIH, though window PUH slowly circulating sweeps out the bit 9,820.0 9,820.0 5/3/2022 17:39 5/3/2022 20:45 3.10 PROD2, STK TRIP T POOH, Problem getting EDC to open from DD console 9,820.0 78.3 Rig: NABORS CDR3-AC RIG RELEASE DATE 5/14/2022 Page 13/20 1B-14 Report Printed: 5/31/2022 Operations Summary (with Timelog Depths) Job: DRILLING SIDETRACK Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 5/3/2022 20:45 5/3/2022 22:18 1.55 PROD2, STK BHAH T At surface, spaceout, PUD BHA #13, Lay down tools P/U cement retainer 78.3 0.0 5/3/2022 22:18 5/3/2022 23:24 1.10 PROD2, STK PULD T PD BHA #14, Inflatable cement retainer , Make up to coil and surface test good 0.0 57.1 5/3/2022 23:24 5/4/2022 00:00 0.60 PROD2, STK TRIP T RIH , BHA # 14 57.1 2,600.0 5/4/2022 00:00 5/4/2022 01:30 1.50 PROD2, STK TRIP T Continue in well with NHA #14, Inflatable cement retainer 2,600.0 9,170.0 5/4/2022 01:30 5/4/2022 01:36 0.10 PROD2, STK DLOG T Log K1 for tie in for -6' correction 9,170.0 9,188.0 5/4/2022 01:36 5/4/2022 01:54 0.30 PROD2, STK TRIP T Continue in well. PUW=35K @ 9700'. Continue in 9,188.0 9,777.5 5/4/2022 01:54 5/4/2022 02:36 0.70 PROD2, STK OTHR T 9777.47, Top of retainer @ 9768, Mid element @ 9772'. Close EDC. Apply 500 PSI to retainer. Hold for 5 minutes, repeat. See tool shift @ 4100 Ct Circ. 9K DHWOB. Pick up off retainer clean 9,777.5 9,777.5 5/4/2022 02:36 5/4/2022 04:36 2.00 PROD2, STK TRIP T POOH for FCO BHA 9,777.5 57.1 5/4/2022 04:36 5/4/2022 06:06 1.50 PROD2, STK BHAH T PUD setting tools BHA #14 57.1 0.0 5/4/2022 06:06 5/4/2022 07:36 1.50 PROD2, STK BHAH P PD, Cleanout Assembly w/2.10 swirl jet nozzle 0.0 42.8 5/4/2022 07:36 5/4/2022 09:06 1.50 PROD2, STK TRIP P RIH with BHA #15 42.8 9,150.0 5/4/2022 09:06 5/4/2022 09:18 0.20 PROD2, STK DLOG P Log the K1 marker correction of -6.0' 9,150.0 9,183.0 5/4/2022 09:18 5/4/2022 09:36 0.30 PROD2, STK TRIP P Continue IH 9,183.0 9,758.0 5/4/2022 09:36 5/4/2022 11:06 1.50 PROD2, STK CIRC P Increase pump rate 2.24 bpm/4,971 psi/Diff 270 9,758.0 9,735.0 5/4/2022 11:06 5/4/2022 12:36 1.50 PROD2, STK TRIP P POOH 9,735.0 42.8 5/4/2022 12:36 5/4/2022 13:54 1.30 PROD2, STK BHAH P PUD, cleanout assembly 42.8 0.0 5/4/2022 13:54 5/4/2022 15:12 1.30 PROD2, STK BHAH P PD, fishing assembly BHA #16 0.0 58.0 5/4/2022 15:12 5/4/2022 17:00 1.80 PROD2, STK TRIP P RIH, with fishing assembly BHA #16 58.0 9,165.0 5/4/2022 17:00 5/4/2022 17:18 0.30 PROD2, STK DLOG P Log the K1 for depth control correction of -6.0' 9,165.0 9,199.0 5/4/2022 17:18 5/4/2022 17:36 0.30 PROD2, STK TRIP P Continue IH' Function closed EDC PUW 37 k CTSW Slackoff 12.8k 9,199.0 9,753.0 5/4/2022 17:36 5/4/2022 18:06 0.50 PROD2, STK FISH P Fish WS inner core at multiple tool faces, 15L had ~8k overpull then came free 9,753.0 9,753.0 5/4/2022 18:06 5/4/2022 21:30 3.40 PROD2, STK TRIP P POOH filling across the top 9,753.0 43.0 5/4/2022 21:30 5/4/2022 22:30 1.00 PROD2, STK PULD P On surface, PJSM, PUD BHA #16. Tray has been recovered. Prep floor for slick line ops 43.0 0.0 5/4/2022 22:30 5/5/2022 00:00 1.50 PROD2, STK SLKL P PJSM, Rig up slick line to fish R plug 0.0 0.0 5/5/2022 00:00 5/5/2022 01:00 1.00 PROD2, STK SLKL P Continue rigging up slick line to fish R plug from whipstock body 0.0 0.0 5/5/2022 01:00 5/5/2022 02:12 1.20 PROD2, STK SLKL P PT SL lubricator to 2500 PSI, Open Swab. RIH, 2.77 LIB. Hang up @ 1906' SSSV. Unable to pass through, POOH 0.0 0.0 Rig: NABORS CDR3-AC RIG RELEASE DATE 5/14/2022 Page 14/20 1B-14 Report Printed: 5/31/2022 Operations Summary (with Timelog Depths) Job: DRILLING SIDETRACK Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 5/5/2022 02:12 5/5/2022 02:30 0.30 PROD2, STK SLKL P On surface, Close master valve, Unstab SL lubricator. No marks on LIB. M/U 2.75 LIB, Stab on well. PT to 2500 PSI 0.0 0.0 5/5/2022 02:30 5/5/2022 04:30 2.00 PROD2, STK SLKL P RIH 2.75 LIB, Tag @ 9742. POOH 0.0 0.0 5/5/2022 04:30 5/5/2022 05:00 0.50 PROD2, STK SLKL P On surface. Unstab SL lubricator, Impression of top of whipstock bodr 0.0 0.0 5/5/2022 05:00 5/5/2022 07:00 2.00 PROD2, STK SLKL P Make up 1.7" LIB for picture of plug POOH, brake off SL Lubricator No results 0.0 0.0 5/5/2022 07:00 5/5/2022 09:30 2.50 PROD2, STK SLKL P Make up / Run pump bailer Min amount of debris, one rock and a couple of chucks 0.0 0.0 5/5/2022 09:30 5/5/2022 11:30 2.00 PROD2, STK SLKL P Make up / Run dogless GS Unable to shear Change tools to Pump Bailer 0.0 0.0 5/5/2022 11:30 5/5/2022 13:30 2.00 PROD2, STK SLKL P Make up / Run Hydro pump bailer Retrieve gravel and metting pieces from tray Makers indicating contact with Fishig Neck of plug 0.0 0.0 5/5/2022 13:30 5/5/2022 15:30 2.00 PROD2, STK SLKL P Make up / Re-Run Hydro pump bailer second time 0.0 0.0 5/5/2022 15:30 5/5/2022 17:00 1.50 PROD2, STK SLKL P Make up / Run GS w/dogs to pull R-plug 0.0 0.0 5/5/2022 17:00 5/5/2022 17:18 0.30 PROD2, STK SLKL P At surface, 5K on SSSV R-plug at surface WHP 115 0.0 0.0 5/5/2022 17:18 5/5/2022 19:00 1.70 PROD2, STK SLKL P RD Slickline equipment 0.0 0.0 5/5/2022 19:00 5/5/2022 20:12 1.20 PROD2, STK PULD P PJSM, M/U BHA #17 NS Mono-Core whipstock and pressure deploy. Make up to coil and surface test coiltrak 0.0 74.9 5/5/2022 20:12 5/5/2022 22:42 2.50 PROD2, RPEQPT TRIP P RIH 74.9 9,180.0 5/5/2022 22:42 5/5/2022 22:48 0.10 PROD2, RPEQPT DLOG P Log K1 for -6' correction 9,180.0 9,209.0 5/5/2022 22:48 5/5/2022 23:06 0.30 PROD2, RPEQPT TRIP P Continue in, weight check 9700', PUW=35K 9,209.0 9,747.0 5/5/2022 23:06 5/5/2022 23:12 0.10 PROD2, RPEQPT TRIP P At set depth, TOWS=9735, Oriented to HS. Close EDC. Roll pump .5 BPM, See tool shift @ 3900 PSI with corresponding DHWOB increase to 3800 LBS 9,747.0 9,747.0 5/5/2022 23:12 5/6/2022 00:00 0.80 PROD2, RPEQPT TRIP P Trip out of well 9,747.0 5,700.0 5/6/2022 00:00 5/6/2022 01:30 1.50 PROD2, RPEQPT TRIP P Continue tripping out after setting NS Mono-Core whipstock 5,700.0 62.0 5/6/2022 01:30 5/6/2022 02:36 1.10 PROD2, RPEQPT PULD P PJSM, PUD BHA #17 62.0 0.0 5/6/2022 02:36 5/6/2022 03:06 0.50 PROD2, RPEQPT CTOP P Make up nozzle - jet flush stack in preperation for BOPE test 0.0 0.0 5/6/2022 03:06 5/6/2022 05:00 1.90 PROD2, RPEQPT RURD P Prep for BOPE test, Grease crew here serviceing tree, Unstab injector remove floats in UQC 0.0 0.0 5/6/2022 05:00 5/6/2022 11:00 6.00 PROD2, RPEQPT BOPE P Start full BOPE test 3500 PSI High / 250 Low 0.0 0.0 5/6/2022 11:00 5/6/2022 11:30 0.50 PROD2, RPEQPT CTOP P RD testing equipment 0.0 0.0 Rig: NABORS CDR3-AC RIG RELEASE DATE 5/14/2022 Page 15/20 1B-14 Report Printed: 5/31/2022 Operations Summary (with Timelog Depths) Job: DRILLING SIDETRACK Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 5/6/2022 11:30 5/6/2022 12:00 0.50 PROD2, RPEQPT CTOP P Slide cart forward, stab onto well, fluid pack lines and reel, PT inner reel valve and pac-off Good test. Brake INJH off well, slide back 0.0 0.0 5/6/2022 12:00 5/6/2022 13:42 1.70 PROD2, RPEQPT BHAH P PD, milling assembly BHA #18 0.0 77.2 5/6/2022 13:42 5/6/2022 15:42 2.00 PROD2, RPEQPT TRIP P Tag up, re-set counter depths, RIH Function closed EDC Surface test muid motor @ 500' 1.8 bpm/Diff 825 psi 77.2 9,184.0 5/6/2022 15:42 5/6/2022 15:54 0.20 PROD2, RPEQPT DLOG P Log the K1 marker correction of minus 6.0' 9,184.0 9,212.0 5/6/2022 15:54 5/6/2022 16:12 0.30 PROD2, RPEQPT TRIP P Continue IH EDC closed PUW=35K 9,212.0 9,734.8 5/6/2022 16:12 5/6/2022 16:18 0.10 PROD2, RPEQPT TRIP P Dry tag whipstock @ 9734.8', PUH, PUW=35K. 9,734.8 9,734.8 5/6/2022 16:18 5/6/2022 17:18 1.00 PROD2, RPEQPT MILL P Milling, 1.8 BPM @ 4462 PSI FSm, BHP=4145, 9,734.8 9,735.0 5/6/2022 17:18 5/7/2022 00:00 6.70 PROD2, RPEQPT MILL P Stall, Pick up and restart, 1.83 BPM @ 4920 PSI FS, BHP=4140. Mill to midnight depth 9738.5 9,735.0 9,738.5 5/7/2022 00:00 5/7/2022 03:24 3.40 PROD2, RPEQPT MILL P Continue milling window, 1.83 BPM @ 4770 PSI FS, BHP=4080 9,738.5 9,740.0 5/7/2022 03:24 5/7/2022 04:36 1.20 PROD2, RPEQPT MILL P Call bottom of window, Time mill 1 foot for string reamer exit.Drilling rathole, 1.8 BPM @ 4770 PSI FS, BHP=4078 9,740.0 9,741.0 5/7/2022 04:36 5/7/2022 05:36 1.00 PROD2, RPEQPT MILL P Mill to 9,750' 9,741.0 9,750.0 5/7/2022 05:36 5/7/2022 06:21 0.75 PROD2, RPEQPT REAM P Perform reaming passes as milled Dry drift window exit and tag TD 9,750' Clean pass through window 9,750.0 9,698.0 5/7/2022 06:21 5/7/2022 06:39 0.30 PROD2, RPEQPT TRIP P PUH Function open EDC Bring pump online 1.8 bpm/3,880 psi/Diff 46 9,698.0 9,698.0 5/7/2022 06:39 5/7/2022 08:39 2.00 PROD2, RPEQPT TRIP P POOH 9,698.0 77.2 5/7/2022 08:39 5/7/2022 09:57 1.30 PROD2, RPEQPT BHAH P At surface, spaceout, PUD milling assembly Mills Gauged = DSM 2.79" no-go, String Reamer 2.80" no-go. 77.2 0.0 5/7/2022 09:57 5/7/2022 10:42 0.75 PROD2, DRILL CTOP P MU swirl jet nozzle, stab INJH onto well Jet across BOPE 34 bbls while recip pipe Unstab INJH, slide cart back 0.0 0.0 5/7/2022 10:42 5/7/2022 12:00 1.30 PROD2, DRILL BHAH P PJSM, PD, build section assembly w/2.5" 0.0 45.0 5/7/2022 12:00 5/7/2022 13:12 1.20 PROD2, DRILL BHAH T BHA stuck in tree, work slickline Bring pump online 1.8 bpm Swing PDL back and forth Pump some more Re-adjust stack in cellar Continue PD 45.0 72.2 5/7/2022 13:12 5/7/2022 15:42 2.50 PROD2, DRILL TRIP P Stab INJH, tag up, re-set counters, RIH 80 fpm *** Note: Seeing every collor as we trip in the hole change TF often no change 72.2 9,170.0 5/7/2022 15:42 5/7/2022 16:00 0.30 PROD2, DRILL DLOG P Log the K1 marker correction of minus 5.0' PUW 34 k 9,170.0 9,189.0 5/7/2022 16:00 5/7/2022 16:30 0.50 PROD2, DRILL TRIP P Continue IH PUW 35k 9,189.0 9,751.0 Rig: NABORS CDR3-AC RIG RELEASE DATE 5/14/2022 Page 16/20 1B-14 Report Printed: 5/31/2022 Operations Summary (with Timelog Depths) Job: DRILLING SIDETRACK Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 5/7/2022 16:30 5/7/2022 20:18 3.80 PROD2, DRILL DRLG P OBD, 1.8 bpm/4,690 psi/Diff 498, WHP 446, BHP 4,432, IA 0, OA 18 9,751.0 9,830.0 5/7/2022 20:18 5/7/2022 22:18 2.00 PROD2, DRILL DRLG P P/U low diff pressure, PUW=41K, Go back to drilling 1.85 BPM @ 4561 PSI FS, BHP=4105 9,830.0 9,862.0 5/7/2022 22:18 5/7/2022 22:48 0.50 PROD2, DRILL WPRT P Pull 100' wiper trip, PUW=41K 9,862.0 9,862.0 5/7/2022 22:48 5/8/2022 00:00 1.20 PROD2, DRILL DRLG P 9862', Drill, 1.85 BPM @ 4475 PSI FS, BHP=4085 9,862.0 9,883.0 5/8/2022 00:00 5/8/2022 03:00 3.00 PROD2, DRILL DRLG P Drill, 1.85 BPM @ 4475 PSI FS, BHP=4085, New mud all around @ 9920 9,883.0 9,928.0 5/8/2022 03:00 5/8/2022 03:06 0.10 PROD2, DRILL WPRT P BHA wiper, get new parameters, Low ROP low diff, PUW=41K 9,928.0 9,928.0 5/8/2022 03:06 5/8/2022 03:30 0.40 PROD2, DRILL DRLG P BOBD, 1.85 BPM @ 4230 PSI FS, BHP=4085. Maintain 2500 to 3K DHWOB, Diff=~200PSI 9,928.0 9,948.0 5/8/2022 03:30 5/8/2022 03:36 0.10 PROD2, DRILL DRLG P Drilling break, ROP 80 to 100 FPH 9,948.0 9,951.0 5/8/2022 03:36 5/8/2022 03:42 0.10 PROD2, DRILL WPRT P Pull BHA wiper, lost diff pressure, PUW=41K 9,951.0 9,951.0 5/8/2022 03:42 5/8/2022 04:06 0.40 PROD2, DRILL DRLG P BOBD, 1.85 BPM @ 4230 PSI FS, BHP=4085. Maintain 2500 to 3K DHWOB, Diff=~200PSI, 9962 Drilling break, ROP down to 15FPH 2.5K DHWOB 9,951.0 9,964.0 5/8/2022 04:06 5/8/2022 04:12 0.10 PROD2, DRILL WPRT P BHA wiper, PUW=43K dragging -1.4K DHWOB 9,964.0 9,964.0 5/8/2022 04:12 5/8/2022 06:00 1.80 PROD2, DRILL DRLG P OBD, 1.84 BPM @ 4230 PSI FS, BHP- 4050, FS Diff=590 PSI 9,964.0 10,000.0 5/8/2022 06:00 5/8/2022 07:00 1.00 PROD2, DRILL DRLG P OBD, 1.84 bpm/4,380 psi/Diff 711, WHP 435, BHP 4,087, IA 0, OA 27 Launch 5x5 sweep 10,000.0 10,070.0 5/8/2022 07:00 5/8/2022 07:18 0.30 PROD2, DRILL WPRT P Build section TD 10,070', PUW 38 k Pull to the window chasing sweeps 10,070.0 9,700.0 5/8/2022 07:18 5/8/2022 07:36 0.30 PROD2, DRILL TRIP P Hesitate for 5x5 sweep, RBIH Function open EDC 9,700.0 9,600.0 5/8/2022 07:36 5/8/2022 09:48 2.20 PROD2, DRILL TRIP P POOH pumping 1.85 bpm 9,600.0 72.2 5/8/2022 09:48 5/8/2022 11:00 1.20 PROD2, DRILL BHAH P At surface, spaceout, PUD build assembly BHA #19 72.2 0.0 5/8/2022 11:00 5/8/2022 12:30 1.50 PROD2, DRILL BHAH P PU, PD latreral section assembly BHA #20 0.0 78.3 5/8/2022 12:30 5/8/2022 14:00 1.50 PROD2, DRILL TRIP P Tag up, re-set counter depths, RIH *** Note: Test agitator and motor 1.8 bpm/Diff 868 psi 78.3 9,175.0 5/8/2022 14:00 5/8/2022 14:12 0.20 PROD2, DRILL DLOG P Log the K1 marker correction of minus 5' 9,175.0 9,207.0 5/8/2022 14:12 5/8/2022 14:30 0.30 PROD2, DRILL TRIP P Continue IH RIW 15 k, PUW 34 k CTSW 9,207.0 9,760.0 5/8/2022 14:30 5/8/2022 15:00 0.50 PROD2, DRILL DLOG P Tie in the RA marker TOW 9,735' BOW/RA 9,740' EOB 10,070' Continue IH, R *** Note: ought trip though open hole to bottom 9,760.0 10,070.0 5/8/2022 15:00 5/8/2022 15:24 0.40 PROD2, DRILL DRLG P Obtain pump paramaters 1.8 bpm/4,437 psi/Diff 851, WHP 419, BHP 4,081, IA 0, OA 14 10,070.0 10,123.0 Rig: NABORS CDR3-AC RIG RELEASE DATE 5/14/2022 Page 17/20 1B-14 Report Printed: 5/31/2022 Operations Summary (with Timelog Depths) Job: DRILLING SIDETRACK Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 5/8/2022 15:24 5/8/2022 15:30 0.10 PROD2, DRILL WPRT P PUH, PUW 36 k CTSW Short wiper 10,123.0 10,123.0 5/8/2022 15:30 5/8/2022 17:30 2.00 PROD2, DRILL DRLG P BOBD, 1.8 bpm/4,457 psi/Diff 889, WHP 398, BHP 4,096, IA 0, OA 12 10,123.0 10,580.0 5/8/2022 17:30 5/8/2022 18:00 0.50 PROD2, DRILL WPRT P Wiper trip to bottom of build, PUW=40K, Clean trip up and down 105,800.0 10,500.0 5/8/2022 18:00 5/8/2022 18:18 0.30 PROD2, DRILL DRLG P Drill, 1.83 BPM @ 4480 PSI FS, BHP=4125 10,500.0 10,545.0 5/8/2022 18:18 5/8/2022 18:24 0.10 PROD2, DRILL WPRT P PUH, eratic tool face, PUW=38K 10,545.0 10,545.0 5/8/2022 18:24 5/8/2022 19:24 1.00 PROD2, DRILL DRLG P Drill, try to build, TF erratic, Try getting TF then turn orienter off 10,545.0 10,593.0 5/8/2022 19:24 5/8/2022 20:12 0.80 PROD2, DRILL WPRT P Still fighting HOT, PUW=38K. Reduce pup rate and increase WOB to help build1.6 BPM # 4110 PSI FS, BHP=4135. HOT unable to hold TF when turned off 10,593.0 10,625.0 5/8/2022 20:12 5/8/2022 22:48 2.60 PROD2, DRILL TRIP T Suspect orienter failure, Pump sweeps, POOH to swap out, PUW=38K. Open EDC @ 9537' BHI NPT @ 20:30 10,625.0 65.7 5/8/2022 22:48 5/9/2022 00:00 1.20 PROD2, DRILL PULD T Tag up, space out, PJSM, PUD BHA # 20 65.7 0.0 5/9/2022 00:00 5/9/2022 01:36 1.60 PROD2, DRILL PULD T Pressure deploy BHA #21 w/.5° AKO motor, Swapped out HOT & DGS 0.0 78.2 5/9/2022 01:36 5/9/2022 03:30 1.90 PROD2, DRILL TRIP T RIH, BHA #21, Shallow test agitator @ 500', 1.8 BPM @ 4392 PSI, 940 PSI Diff, Open EDC. Continue in well 78.2 9,175.0 5/9/2022 03:30 5/9/2022 03:42 0.20 PROD2, DRILL DLOG T Log K1 for -6' correction, Continue in well 9,175.0 9,204.0 5/9/2022 03:42 5/9/2022 04:30 0.80 PROD2, DRILL TRIP T Continue in well,, 9700 Shut EDC, PUW -35K, Continue in. Clean through window. Taking weight in build section. No pick ups. Tight spot @ 10618. Work through 9,204.0 10,630.0 5/9/2022 04:30 5/9/2022 06:45 2.25 PROD2, DRILL DRLG P Drill, 1.5 BPM @ 3900 PSI FS, BHP=4100PSI, Off BHI NPT 10,630.0 10,900.0 5/9/2022 06:45 5/9/2022 07:15 0.50 PROD2, DRILL WPRT P Wiper up hole with sweeps, PUW 42 k CTSW 10,900.0 10,100.0 5/9/2022 07:15 5/9/2022 07:45 0.50 PROD2, DRILL WPRT P Wiper back in hole, RIW 10 k 10,100.0 10,900.0 5/9/2022 07:45 5/9/2022 09:45 2.00 PROD2, DRILL DRLG P BOBD, 1.80 bpm/4,657 psi/Diff 577, WHP 279, BHP 4,125, IA 0, OA 22 10,900.0 10,964.0 5/9/2022 09:45 5/9/2022 11:45 2.00 PROD2, DRILL DRLG P OBD, 1.82 bpm/4,942 psi/Diff 1.110 psi, WHP 313, BHP 4,143, IA 0, OA 30 10,964.0 11,116.4 5/9/2022 11:45 5/9/2022 13:45 2.00 PROD2, DRILL DRLG P OBD, 1.82 bpm/5,032 psi/Diff 1,212 psi, WHP 284, BHP 4,172, IA 0, OA 38 11,116.4 11,267.0 5/9/2022 13:45 5/9/2022 14:33 0.80 PROD2, DRILL DRLG P OBD, 1.83 bpm/4,866 psi/Diff 1,011 psi, WHP 284, BHP 4,184, IA 0, OA 42 11,267.0 11,300.0 5/9/2022 14:33 5/9/2022 16:33 2.00 PROD2, DRILL WPRT P Wiper up hole to 10,500', PUW 42 k Tight area 11,131'-11,127 10,647'-10,932', work to cleanup hole, pumping mulitple sweeps x 4 *** Note: To pass 10,621', lower pump rate to 0.5 bpm/30 fpm 11,300.0 10,500.0 5/9/2022 16:33 5/9/2022 17:33 1.00 PROD2, DRILL WPRT P Wiper back in hole, slowly, attempting to keep rate up 10,500.0 11,300.0 5/9/2022 17:33 5/9/2022 18:33 1.00 PROD2, DRILL WPRT P Tag bottom, PUH chasing sweeps 11,121' temporily detained for a short period, work pipe free, continue wiper chasing sweeps to 10,425' 11,300.0 10,425.0 Rig: NABORS CDR3-AC RIG RELEASE DATE 5/14/2022 Page 18/20 1B-14 Report Printed: 5/31/2022 Operations Summary (with Timelog Depths) Job: DRILLING SIDETRACK Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 5/9/2022 18:33 5/9/2022 19:33 1.00 PROD2, DRILL WPRT P RBIH, trouble getting through 10,621' Lower pump rate to 0.5 bpm/30 fpm, didn't see it, work pump back up to 1.5 bpm 10,425.0 11,300.0 5/9/2022 19:33 5/9/2022 21:33 2.00 PROD2, DRILL DRLG P BOBD, 1.8 bpm/4,395 psi/Diff 658, WHP 356, BHP 4,168, IA 0, OA 44 Start sending beaded 5 bbl pills for weight transfer climbing up to 102° INC 11,300.0 11,500.0 5/9/2022 21:33 5/9/2022 23:33 2.00 PROD2, DRILL DRLG P OBD, 1.8 bpm/5,085 psi/Diff 1,086, WHP 249, BHP 4,183, IA 0, OA 40 Pumping beaded pills 11,500.0 11,657.0 5/9/2022 23:33 5/10/2022 00:00 0.45 PROD2, DRILL DRLG P OBD, 1.8 bpm/5,026 psi/DIff 1,076, WHP 238, BHP 4,183, IA 0, OA 40, Started mud swap to sys 5. New mud at bit 11665 Pumping beaded pills 11,657.0 11,663.0 5/10/2022 00:00 5/10/2022 00:36 0.60 PROD2, DRILL DRLG P OBD, 1.8 bpm/5,026 psi/DIff 1,076, WHP 238, BHP 4,183, IA 0, OA 40. New mud all around @ 11,685 11,663.0 11,701.0 5/10/2022 00:36 5/10/2022 01:36 1.00 PROD2, DRILL WPRT P Pull wiper #3 to window with tie in, PUW=38K. Sharp overpull @ 10,930, Rubble zone 10,630 to 10,500., Overpulls in build section. Going to pull up to K1 for tie in 11,701.0 9,150.0 5/10/2022 01:36 5/10/2022 01:48 0.20 PROD2, DRILL DLOG P Log K1 for +17' 9,150.0 9,203.0 5/10/2022 01:48 5/10/2022 03:36 1.80 PROD2, DRILL WPRT P Continue wiper back in hole to drill, Clean trip past window, Build section less choppy, 10,630 to 10975' area set downs. Clear to setdown @ 11,148'. Two pickups reduces pump to 1 BPM got past. Set down @ 11,170 on pick up and past. Rate back up to 1.5 BPM, Set down 11,500' Pick up go past. Work to get past 11,685 9,203.0 11,685.0 5/10/2022 03:36 5/10/2022 03:48 0.20 PROD2, DRILL WPRT P High differential off bottom, Cleaning up last 40 feet of hole, DHWOB all over 11,685.0 11,700.0 5/10/2022 03:48 5/10/2022 03:54 0.10 PROD2, DRILL DRLG P Drill, 1.86 BPM @ 5130 PSI FS, BHP=4240, Drilling break @ 11,710 over 15FPH 11,700.0 11,711.0 5/10/2022 03:54 5/10/2022 04:00 0.10 PROD2, DRILL WPRT P PUH to sort out DHWOB, PUW=44K 11,711.0 11,711.0 5/10/2022 04:00 5/10/2022 07:30 3.50 PROD2, DRILL DRLG P 11711', Drill 1.86 BPM @ 5036 PSI FS, BHP=4209, Free spin diff 955 PSI 11,711.0 12,011.0 5/10/2022 07:30 5/10/2022 07:54 0.40 PROD2, DRILL WPRT P BHA wiper, working CT waiting on beads, PUW=39K 12,011.0 12,011.0 5/10/2022 07:54 5/10/2022 08:48 0.90 PROD2, DRILL DRLG P Drill, 1.8 BPM @ 4819 PSI FS, BHP=4273 12,011.0 12,100.0 5/10/2022 08:48 5/10/2022 10:48 2.00 PROD2, DRILL WPRT P Wiper trip #1 to 11,300, PUW=40K, Slight over 11600 area. Set down @ 11,639 on way in 12,100.0 12,100.0 5/10/2022 10:48 5/10/2022 15:24 4.60 PROD2, DRILL DRLG P Drill, 1.82 BPM @ 4567 PSI FS, BHP=4333 12,100.0 12,350.0 5/10/2022 15:24 5/10/2022 16:54 1.50 PROD2, DRILL WPRT P Call TD, Pump 10X10 sweeps start pulling to swab, 12,020 Pulling heavy, ratty hole work pipe beck in hole pump 5X5 sweeps 12,350.0 12,100.0 5/10/2022 16:54 5/10/2022 21:30 4.60 PROD2, DRILL WPRT P Pull up through problem area 12,100 to 12,010 on beads, PUW from 55 to 40K, Choppy with stalls and overpull 11,690 to 11,600, Heavy overpull @ 11,000' with stall 12,100.0 80.0 Rig: NABORS CDR3-AC RIG RELEASE DATE 5/14/2022 Call TD, 12,350.0 Page 19/20 1B-14 Report Printed: 5/31/2022 Operations Summary (with Timelog Depths) Job: DRILLING SIDETRACK Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 5/10/2022 21:30 5/11/2022 00:00 2.50 PROD2, DRILL PULD T PJSM // Pressure Un-Deploy BHA# 21 // during undeploy pressure leaking through and running over stack // put cart back on well to close EDC and confirm rams not leaking // closed EDC and no leaks // continue to un-deploy BHA found motor came apart AKO down, housing bit and mandrel left in hole 80.0 0.0 5/11/2022 00:00 5/11/2022 00:45 0.75 PROD2, DRILL PULD T Swap BHA for missing motor parts 0.0 0.0 5/11/2022 00:45 5/11/2022 01:45 1.00 PROD2, DRILL PULD T Pressure Deploy BHA 22 0.0 76.0 5/11/2022 01:45 5/11/2022 02:45 1.00 PROD2, DRILL TRIP T Tag up and set counters // RIH // Tag fish @ 2700' // PU attempt to re-tag not there // pooh for fishing run 76.0 2,700.0 5/11/2022 02:45 5/11/2022 04:00 1.25 PROD2, DRILL TRIP T Tag motor @ 2700 Pooh for fishing run 2,700.0 76.0 5/11/2022 04:00 5/11/2022 06:00 2.00 PROD2, DRILL PULD T PUD BHA# 22, No fish on mill 76.0 0.0 5/11/2022 06:00 5/11/2022 10:36 4.60 PROD2, DRILL WAIT T Wait on dimension of fish / fishing options / fishing tools 0.0 0.0 5/11/2022 10:36 5/11/2022 12:24 1.80 PROD2, DRILL PULD T PJSM Make up BHA #23 Magnet run. Pressure deploy 0.0 44.9 5/11/2022 12:24 5/11/2022 13:48 1.40 PROD2, DRILL TRIP T RIH BHA #23 44.9 2,853.0 5/11/2022 13:48 5/11/2022 14:42 0.90 PROD2, DRILL TRIP T Stack out 6.5K @ 2853. PUH. Stack out in same place, POOH to check magnet 2,853.0 1,961.0 5/11/2022 14:42 5/11/2022 15:18 0.60 PROD2, DRILL TRIP T 1961, Pull tight. Suspect CTC at TMAXX flapper. SSSV @ 5300 PSI. Pump up to 5500, 5700, 6000, then 6200 PSI. No go 1,961.0 1,961.0 5/11/2022 15:18 5/11/2022 15:48 0.50 PROD2, DRILL TRIP T RIH 25 feer, Cycle SSSV closed then open multiple times. Try again. no good. Cycle SSSV 3 more times. Line up and pump down CT taking returns a few times at different rates and speeds 1,961.0 1,961.0 5/11/2022 15:48 5/11/2022 16:36 0.80 PROD2, DRILL TRIP T Trip in hole 1000' thinking coil may flop around. Pull up hole, Tag up at 1961 1,961.0 1,961.0 5/11/2022 16:36 5/11/2022 17:51 1.25 PROD2, DRILL TRIP T Line up down back side, Increase pump rate in 1/2 bbl increments trying to come up. Pulled up through SSSV @ 1.85 BOM 1,961.0 80.0 5/11/2022 17:51 5/11/2022 19:06 1.25 PROD2, DRILL PULD T PUD BHA# 23 ... No Fish 80.0 0.0 5/11/2022 19:06 5/11/2022 19:45 0.65 PROD2, DRILL PULD T Pick up and deploy brush assembly 0.0 6.0 5/11/2022 19:45 5/11/2022 20:30 0.75 PROD2, DRILL TRIP T Trip in to 1900' 6.0 1,900.0 5/11/2022 20:30 5/11/2022 21:00 0.50 PROD2, DRILL CIRC T Flush past SSSV 3 times function closed // function open // 1,900.0 1,900.0 5/11/2022 21:00 5/11/2022 21:30 0.50 PROD2, DRILL TRIP T POOH for fishing run 1,900.0 6.0 5/11/2022 21:30 5/11/2022 22:30 1.00 PROD2, DRILL PULD T Tag up and close swab // Bleed off pressure // Line up pump managed pressure // Lay down brush and flush assembly 6.0 0.0 5/11/2022 22:30 5/11/2022 23:15 0.75 PROD2, DRILL PULD T PD BHA# 25 , Quadco Hydraulic GS Spear , jars, coil track tools 0.0 50.0 5/11/2022 23:15 5/12/2022 00:00 0.75 PROD2, DRILL TRIP T RIH 50.0 2,300.0 5/12/2022 00:00 5/12/2022 02:45 2.75 PROD2, DRILL TRIP T Continue in hole with Quadco fishing tools 2,300.0 9,150.0 Rig: NABORS CDR3-AC RIG RELEASE DATE 5/14/2022 Page 20/20 1B-14 Report Printed: 5/31/2022 Operations Summary (with Timelog Depths) Job: DRILLING SIDETRACK Time Log Start Time End Time Dur (hr) Phase Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 5/12/2022 02:45 5/12/2022 03:00 0.25 PROD2, DRILL DLOG T Tie in K1 for -5' Correction 9,150.0 9,182.4 5/12/2022 03:00 5/12/2022 03:15 0.25 PROD2, DRILL TRIP T RIH to window with Quadco Fishing tools run to bottom of window no apparent set downs 9,182.4 9,744.0 5/12/2022 03:15 5/12/2022 04:15 1.00 PROD2, DRILL TRIP T POOH to inspect fishing tools 9,744.0 1,921.0 5/12/2022 04:15 5/12/2022 07:00 2.75 PROD2, DRILL TRIP T Hung up at SSSV. Work pipe, cycle valve, Pump down back side. Pull up through SSSV 1,921.0 1,921.0 5/12/2022 07:00 5/12/2022 07:54 0.90 PROD2, DRILL TRIP T Continue trip to surface 1,921.0 38.0 5/12/2022 07:54 5/12/2022 09:30 1.60 PROD2, DRILL PULD T Tag up, Space out, PJSM PUD BHA # 25, Recovered spacer ring in hydraulic spear 38.0 0.0 5/12/2022 09:30 5/12/2022 21:30 12.00 PROD2, DRILL SLKL T PJSM w/ HES slickline, MIRU slickline unit // Run slick line ops for opening the SSSV 20:00-XXXX - Re-build SL tools 0.0 0.0 5/12/2022 21:30 5/13/2022 00:00 2.50 PROD2, DRILL WAIT T Wait on Slick Line Crew 0.0 0.0 5/13/2022 00:00 5/13/2022 04:30 4.50 PROD2, DRILL SLKL T Wait for Slick line Crew 0.0 0.0 5/13/2022 04:30 5/13/2022 05:00 0.50 PROD2, DRILL BOPE T Function test BOP's all function ok 0.0 0.0 5/13/2022 05:00 5/13/2022 06:00 1.00 PROD2, DRILL WAIT T Wait for Slick Line Crew 0.0 0.0 5/13/2022 06:00 5/13/2022 20:00 14.00 PROD2, DRILL SLKL T SL ops to lock out SSSV , un-successful 0.0 0.0 5/13/2022 20:00 5/13/2022 21:00 1.00 PROD2, DRILL RURD P Rig Down Slick line 0.0 0.0 5/13/2022 21:00 5/13/2022 23:00 2.00 PROD2, DRILL CTOP P Decision made to RDMO // remove fluid from pits // trucks move mud to 2M // Start RDMO checklists 0.0 0.0 5/13/2022 23:00 5/14/2022 00:00 1.00 PROD2, DRILL FRZP P Little Red Pump 25 bbls into coil, bullhead into well with rig pump, close master and shut in 0.0 0.0 5/14/2022 00:00 5/14/2022 03:00 3.00 DEMOB, WHDBOP RURD P Flush and blow down surface lines , flush stack for BOP test, prep for nipple down of BOP's 0.0 0.0 5/14/2022 03:00 5/14/2022 06:00 3.00 DEMOB, WHDBOP RURD P BOPE off tree, Pits are empty. RIG RELEASE @ 06:00 0.0 0.0 Rig: NABORS CDR3-AC RIG RELEASE DATE 5/14/2022 !" #$ #%& '( ) ( *%$ ( +, ( ( # -. /( /0( $( !"#$"" %& .(0 ('()* (!"#$"" %& ( +** ( )( 1)( ' 2( ))(*,#-%'./ * & ,#-%00& 1 2** 1 * 3" 4* 5+** / 55/ /*/ / / *.$( *$( 3 .( .( 435%/ 45% ! 1$*( "$"" "$"" )1,6,16-$" ),1,"$7 "$""/$3( "$"" -"8,9"$#67 ,87)9#$:7"+ /0 678 9$. 6+8 ) . 678 $). ;;#"# <#"<#"## )$" :"$6, )-1#6"$) (, ( $ ( . $" (4 ,( 9)6+,8 6 8 45% 6 8 678 435%/ 6 8 +: (,16:"$" )$"""$"""$"""$-" 9) 6 8 .) +)6/08 + 6 8 )<:<#"## +0+; 0+;+ 6-$7# ,16:"$" %&:<#)<#"""#=""= +0+; 0+;+ ,1--"$"" #1"::$"" %&<#:<#"##:=-=" 6 8 ; 678 < 678 435%/ 6 8 45% 6 8 +, 6 8 +, 6 8 . 6 8 3 . 6 8 , 6 8 * 675=8 +) ,16:"$" 7:$7 7#$,# 61)6$)6 1,#6$,: 1:$:"61$)6 )1,-1)6$"7 ))1-),$7) "$6# )-$- +0+;%#& +%% )#%& ,1--"$"" 7-$6" 7#$-, 616-$6 1,-#$ 1)"$),61))$6 )1,-1),"$,: ))1-#-$#6 "$6" ):"$,# +0+;%#& :%+ / ,1-,"$7" #$- 7#-$"" 61677$: 1,:#$,# 1)-$::61)7$: )1,-16"$- ))1-,$," #7$)- ):7$7, +0+;%#& ; $<) ,1:#"$:7 )6$"" 7#,$7" 616)7$7 )1""#$)" 16,$,:61))$7 )1,-16#$#" ))1-"-$6- )$6) )::$6: +0+;%#& ; $<) ,1:)"$,7 -$7) 77$6" 61666$ )1"#)$, 1:7$#61)6$ )1,-16$)7 ))16,$#: )$) ),)$:: +0+;%#& ; $<) ,1::"$,# :)$6 777$6" 616-#$" )1")$, 1,6$6,61)-"$" )1,-16-"$6 ))16:"$6 :$", 6"$-) +0+;%#& ; $<) ,1,#$#) "#$7 77)$-) 6166,$6 )1"::$- 1#7$:61)6-$6 )1,-1-"6$)- ))1667$# $-) 6:$# +0+;%#& ,1,)"$6- "$-- 7)"$," 61667$7 )1)$6) 1###$"-61)6$7 )1,-1-77$,, ))16)$: )"$7, 67$:) +0+;%#& '( ) ( *%$ ( +, ( ( # -. /( /0( $( !"#$"" %& .(0 ('()* (!"#$"" %& ( +** ( 6 8 ; 678 < 678 435%/ 6 8 45% 6 8 +, 6 8 +, 6 8 . 6 8 3 . 6 8 , 6 8 * 675=8 +) ,1,:"$- "$7" 6$: 616)-$7: )1)$"" 1###$:#61)))$7: )1,-1-67$7 ))16)7$," ,$: 6)#$", +0+;%#& "1""$: "7$" #$-6 616)$" )1-7$ 1#)$-661),$" )1,-1-,$:# ))166"$-6 )"$,- 6--$: +0+;%#& "1""$- "7$) 7-$7 616$", )1,:$6: 1#"$#61)#$", )1,-1:-$) ))16-$,7 )"$,- -")$- +0+;%#& "1"-$"7 "7$,# )7$"# 61676$:- )1#,$7 1:"$661)7$:- )1,-1:7-$,) ))16,)$6" )"$" -7$, +0+;%#& "1"$: ""$6) 6:$)# 6167"$#: )1#77$,) 1)$61)#:$#: )1,-1:)#$-7 ))1-#$6- )"$7# -67$77 +0+;%#& "17#$#) ,,$"- -,$7" 616#)$") )1##$# 1#)$6-61)#7$") )1,-1:6$# ))1-)"$7: 7)$#- -:,$) +0+;%#& "16#$- ,-$:: :#$7 616#"$6" )1#-$" 1",6$-61):$6" )1,-1:66$: ))1--,$:) "$-" :7$-- +0+;%#& "1,$,- ,6$"" :)$67 616-$"7 )1#)"$": 1"6-$")61))$"7 )1,-1:6,$ ))1:":$,) #$-- :76$)7 +0+;%#& "1###$#: ,)$7) :,$#: 616$" )1#)$ 1"76$,#61)#$" )1,-1:-"$,- ))1:7,$"6 #$- :):$-: +0+;%#& "1#)#$ ,$6 ,#$": 616$ )1#)$"6 1""6$,61)",$ )1,-1:-"$:# ))1:6,$"- ,$)) :-,$- +0+;%#& "1#:7$7- ,7$: ,$#7 616",$# )1#,$76 71,-6$",61)"-$# )1,-1:6,$7# ))1:,,$," -$7, ,""$7 +0+;%#& "17#$" ,7$)" ,:$#- 616"-$#6 )1#6$#" 71,-$#,61)")$#6 )1,-1:66$76 ))1,#:$- 7$, ,:$- +0+;%#& "17#$) ,#$7" "$," 616")$- )1#"$,7 71,-$6661)"7$- )1,-1:6$#, ))1,):$7- #$6- ,7)$6, +0+;%#& "17-#$67 ,$ ")$)# 616"$:7 )1#77$: 71:::$)61)"#$:7 )1,-1:)$76 ))1,:-$67 #$67 ,)$7 +0+;%#& "1"#$:# ,#$"" ":$,6 616"$" )1##$:6 71:),$6761)"#$" )1,-1:)$6 )61"6$) $- ,6)$7- +0+;%#& "17#$66 ,#$,) #$" 616"#$-# )1#$7 71:7$-61)""$-# )1,-1:7)$#- )61"$6 $,) ,--$6 +0+;%#& "16#$66 ,7$- 6$," 616"$" )1#"$:) 71:"$)761,,$" )1,-1:##$,6 )61"-$-6 )$": ,::$"6 +0+;%#& "1,-$7, ,#$: #"$) 61),,$77 )1:)$# 71--$"61,-$77 )1,-1:"6$)# )61"#$#, "$:6 ,,-$:" +0+;%#& "1)#-$, ,"$,) :$): 61),:$) )1-"$)7 71-:$:61,6$) )1,-1-,#$"# )61#:$7 -$) 1"")$-6 +0+;%#& "1))-$) ,"$,# 6$) 61),:$"# )1)6$67 71-#$761,6$"# )1,-1--:$7" )61))$#6 :$"7 1"$,# +0+;%#& "1):-$7, ,"$:7 7$-6 61),-$)6 )1$"" 716,$-61,)$)6 )1,-1-6)$:) )61:#$: -$,, 1"#)$: +0+;%#& "16#$7 ,"$- $)- 61),-$#7 )17$7: 716-$)61,)$#7 )1,-1-)6$7, )61#")$)- :$-, 1"7$66 +0+;%#& "16)$#- ,"$,: ":$,- 61),6$- )1##$,: 716"$#-61,$- )1,-1-)$, )61#76$)# -$, 1":$ +0+;%#& "16-)$)6 ,$#, "6$, 61),6$ )17$:7 716$"61,$ )1,-1-76$# )61#6)$) ,$#7 1"6#$7: +0+;%#& "1-""$- ,"$- "7$," 61),)$-" )1"-$ 71):-$661,7$-" )1,-1-7"$" )61#:,$#) ,$)- 1"-$6- +0+;%#& "1-7"$6 ,"$) "$-, 61),)$- )1""$-: 71)):$"61,7$- )1,-1-#7$) )617:$)# -$7 1","$67 +0+;%#& "1-6"$") ,#$7 ,,$7, 61),$:" )1",)$#, 71)#,$"761,#$:" )1,-1-:$# )617-$,7 $"- 1"-$) +0+;%#& "1-,"$# ,7$" ,6$-, 61),7$7 )1",$" 71,,$:61,$7 )1,-1-$#" )617--$:" :$:: 1#)$6# +0+;%#& "1:#)$, ,$7: ,7$6) 61),$,- )1":-$:- 716$61:,$,- )1,-1-$#6 )61#$), "$# 1-$,6 +0+;%#& "1:))$: ,"$6 ,$# 61),$ )1":6$)7 717$)61:,$ )1,-1-"$# )61#$:) -$-6 16:$" +0+;%#& "1::)$", ,"$-- ::$# 61),$": )1":6$6# 71"$))61:,$": )1,-1-"$" )61-#$) "$-) 1:,$" +0+;%#& "1,)$", ,"$: :)$-# 61),"$:7 )1"::$#" 717-$),61::$:7 )1,-1-#$: )61)"#$7, :$67 1#$-" +0+;%#& "1,$6 ::$:" :7$7 61),$", )1",$"6 717)$##61:,$", )1,-1-)$# )61)7$-) ,$, 1#7$)" +0+;%#& "1,-)$"7 ,"$7- :$77 61),$7 )1",)$: 717)$":61:,$7 )1,-1-,$)6 )61)6$:) -$:) 1#):$-# +0+;%#& 1""$-" :,$-, -,$66 61),$#- )1""$"- 71#:)$:#61:,$#- )1,-1-#$6) )61),$": )$,6 1#:#$:- +0+;%#& 1"7)$7- ,"$", -6$,, 61),$7" )1"6$#: 71#))$-,61:,$7" )1,-1-7$") )616#$"- :$-6 17":$)" +0+;%#& 1"6)$6# ::$: -$: 61),$): )17$: 71##6$,61:,$): )1,-1-7:$-: )616)"$7 "$- 177$)7 +0+;%#& 1",)$#7 :,$ -#$7 61),#$ )1##$7 71,:$)61,"$ )1,-1--$)" )616-:$), 6$" 176"$6 +0+;%#& 1#$,7 :-$76 -$)) 61),7$" )17$)) 716,$,761,$" )1,-1-)6$:, )61-"6$-) 6$)# 17:-$": +0+;%#& 1)$- ::$)" -$"6 61),$"- )1"$, 71#$"61,#$"- )1,-1-6)$-# )61-7$6" ,$# 1#$,# +0+;%#& '( ) ( *%$ ( +, ( ( # -. /( /0( $( !"#$"" %& .(0 ('()* (!"#$"" %& ( +** ( 6 8 ; 678 < 678 435%/ 6 8 45% 6 8 +, 6 8 +, 6 8 . 6 8 3 . 6 8 , 6 8 * 675=8 +) 1:$)# ::$:" -6$#: 61),$-: )1-$,) 71#$6:61,#$-: )1,-1--7$6: )61-67$:- -$7: 17,$) +0+;%#& 1#$7 :6$6: -,$- 61),)$,6 )1)$#, 71":7$)-61,7$,6 )1,-1-:"$#" )61-,#$, #$" 16$## +0+;%#& 1#$77 :6$)" :$7: 61),-$- )1),$7) 71")$"-61,)$- )1,-1-:)$6 )61:##$ -$7: 1::$6) +0+;%#& 1#6,$)# :6$#: :#$-" 61),,$77 )16#$:7 71"#,$-61,-$77 )1,-1-:,$" )61:-$#: )$7" 1)":$-# +0+;%#& 17"$7 :)$6 :$): 616"$)6 )166$7# #1,,-$:61,,$)6 )1,-1-,#$:" )61:-:$), 6$#- 1)77$7) +0+;%#& 177#$"# :6$), :6$: 616"7$6) )16:$67 #1,6-$61)"$6) )1,-1-,)$7# )61,",$7" -$:7 1))6$- +0+;%#& 176#$#, :-$-7 :,$" 616")$) )16,$67 #1,76$:,61)"7$) )1,-1-,6$)# )61,7,$)" ,$7 1)-:$-: +0+;%#& 17,7$, :6$,, ,$,: 616"6$)- )16,$#6 #1,"6$"761)"$)- )1,-1-,6$7) )61,-"$76 :$6: 16""$7 +0+;%#& 1##$# :6$- ,$- 616":$# )16-$)) #1:-6$,"61)"6$# )1,-1-,$: )61,,,$)" ,$), 16,$-7 +0+;%#& 1)#$66 :)$) ,-$-- 616"$7- )16$#6 #1:6$,#61)":$7- )1,-1-,$-) )-1"#,$)" "$)) 167:$6 +0+;%#& 1:#$-7 :)$:) ""$)" 616#$6) )1),$)" #1:-$7#61)"$6) )1,-1-:-$, )-1"),$7 ,$) 16)6$- +0+;%#& 1)#$7" :6$: "$-- 616$) )1)7$") #1-::$)761)#$) )1,-1-:"$,7 )-1":-$,) $-, 16-$,- +0+;%#& 1)#$: :-$-, "-$ 616)$,) )1$-- #1-),$))61)7$,) )1,-1--#$: )-16$,, :$76 16:6$6 +0+;%#& 1)-#$ ,"$7 "-$" 6166$# )17)$,, #1-7"$,61)$# )1,-1-6$#) )-1)$6) :$:# 1-""$6# +0+;%#& 16"#$), ,$7# "$#" 616)$,6 )1#-$:6 #1-"$::61)7$,6 )1,-1-)6$7# )-1-$-6 ,$:6 1-)$7 +0+;%#& 167#$-# ,#$# "#$7 616)$") )1#"$,6 #16-#$)-61)7$") )1,-1-,$6 )-1#"$# 6$: 1-7$#- +0+;%#& 166#$, ,#$6 ,,$)" 6167$:6 )1)$77 #167$7661)$:6 )1,-1-$: )-1#77$76 ,$)" 1--$, +0+;%#& 16,#$7: ,#$, ,-$") 616#$)- )1$"7 #167$:#61)"$)- )1,-1-"$": )-1#6#$,7 :$, 1-6)$:" +0+;%#& 1-##$7" ,#$# ,7$:, 616$#, )1":$: #1):$"661)",$#, )1,-1-7-$# )-1#,#$-" "$)) 1-:$:# +0+;%#& 1-)#$- ,#$6" ,"$7" 616",$,: )1"-$", #1))$#)61)"-$,: )1,-1-76$)7 )-17##$)# #$"# 1:")$7 +0+;%#& 1-:#$#6 ,7$: :-$: 616":$#, )1"-$6- #1)#$#61)"6$#, )1,-1-7-$7 )-17)#$) "$## 1:#6$-: +0+;%#& 1:#$, ,$7, :$) 616"6$ )1",$-6 #1,$61)"$ )1,-1-7,$6" )-17:#$7" "$"- 1:,$7 +0+;%#& 1:76$76 ,$6 :$6" 616"$#) )1#$6- #1-"$)#61)"#$#) )1,-1-#$6- )-1"6$#" #$" 1:6:$#: +0+;%#& 1:-#$7" ,$", -:$" 616"$)# )1:$:, #17)$#761,,$)# )1,-1-,$# )-1$ ,$"" 1:,-$67 +0+;%#& 1,"#$ ,#$:6 -)$:6 61),,$- )1#)$)7 #1"6$#"61,-$- )1,-1-))$,) )-1-"$# ,$ 1,##$:6 +0+;%#& 1,7$7, ,"$-- -)$"- 61),:$6, )177$6# #17-)$""61,6$6, )1,-1-6$#) )-1)"$)- 6$,7 1,)"$6 +0+;%#& 1,6#$7# ,#$,) -7$,) 61),-$-: )1$"- #17:$"61,)$-: )1,-1--$:: )-1)#:$ :$-- 1,-$,7 +0+;%#& 1,,#$#) ,#$6 -"$:- 61),6$7# )1)"$" #17,$661,$7# )1,-1-:$" )-1))6$: "$77 #1""$6 +0+;%#& #1"##$6 ,7$ 6,$)# 61),$- )16"$## #1#,$)61,#$- )1,-1-,$ )-1):$:- )$# #1"#:$, +0+;%#& #1")#$", ,"$,# 67$)" 61),7$6" )1-#$ #1#6$",61,$6" )1,-1:"7$)" )-16#$#" #$-, #1")6$7" +0+;%#& #1"::$"" ,"$,# 67$)" 61),7$"# )1::$6 #1#7$,661,$"# )1,-1:,$- )-16$#7 "$"" #1","$7) +0+;%#& '+ T + 1 337.856-7201 1058 Baker Hughes Drive Broussard, LA 70518, USA May 23, 2022 AOGCC Attention: Natural Resources Technician 333 W. 7th Ave., Suite 100 Anchorage, Alaska 99501-3539 Subject:Final Log Distribution for ConocoPhillips Alaska, Inc. 1B-14A Kuparuk River API #: 50-029-22452-01-00 Permit No: 222-021 Rig: CDR3 The final Coil deliverables were uploaded via https://copsftp.sharefile.com/ for the above well. Items delivered: Digital Las Data, Graphic Images CGM/PDF and Survey Files. Thank you. Signature of receiver & date received: Please return transmittal letter to: Jenny Jones Jenny.E.Jones@conocophillips.com Luis G Arismendi Luis.arismendi@bakerhughes.com PTD: 222-021 T36672 Kayla Junke Digitally signed by Kayla Junke Date: 2022.05.31 14:10:02 -08'00' CAUTION: This email originated from outside the State of Alaska mail system. Do not click links or open attachments unless you recognize the sender and know the content is safe. From:Coyne, Cleve To:Brooks, Phoebe L (OGC);DOA AOGCC Prudhoe Bay;ncdr3cm@conocophillips.com;Henson, James Subject:BOP Test Nabors CDR3 1B-14 4-22-22 Date:Sunday, April 24, 2022 11:48:57 AM Attachments:1B-14 BOP State Report 4-22-2022.xlsx ******************************* NABORS EMAIL NOTICE - This transmission may be strictly proprietary and confidential. If you are not the intended recipient, reading, disclosing, copying, distributing or using the contents of this transmission is prohibited. If you have received this in error, please reply and notify the sender (only) and delete the message. Unauthorized interception of this e-mail is a violation of federal criminal law. This communication does not reflect an intention by the sender or the sender's principal to conduct a transaction or make any agreement by electronic means. Nothing contained in this message or in any attachment shall satisfy the requirements for a writing, and nothing contained herein shall constitute a contract or electronic signature under the Electronic Signatures in Global and National Commerce Act, any version of the Uniform Electronic Transactions Act, or any other statute governing electronic transactions. .58%$ 37' STATE OF ALASKA OIL AND GAS CONSERVATION COMMISSION *All BOPE reports are due to the agency within 5 days of testing* SSu b m i tt t o :jim.regg@alaska.gov; AOGCC.Inspectors@alaska.gov; phoebe.brooks@alaska.gov Owner/Contractor: Rig No.:CDR3AC DATE: 4/22/22 Rig Rep.: Rig Phone: 907-670-6082 Operator: Op. Phone:907-670-6050 Rep.: E-Mail Well Name: PTD #22220210 Sundry # Operation: Drilling: X Workover: Explor.: Test: Initial: X Weekly: Bi-Weekly: Other: Rams:250/3500 Annular:250/2500 Valves:250/3500 MASP:2606 MISC. INSPECTIONS: TEST DATA FLOOR SAFETY VALVES: Test Result Test Result Quantity Test Result Location Gen.P Well Sign P Upper Kelly 0NA Housekeeping P Rig P Lower Kelly 0NA PTD On Location P Hazard Sec.P Ball Type 2P Standing Order Posted P Misc.NA Inside BOP 0NA FSV Misc 0NA BOP STACK:Quantity Size/Type Test Result MUD SYSTEM:Visual Alarm Stripper 1 2''P Trip Tank NA NA Annular Preventer 1 7 1/16''P Pit Level Indicators PP #1 Rams 1 Blind Shear P Flow Indicator PP #2 Rams 1 2'' Combi P Meth Gas Detector PP #3 Rams 1 2 3/8'' Combi FP H2S Gas Detector PP #4 Rams 1 2'' Combi P MS Misc 0NA #5 Rams 0NA #6 Rams 0NA Quantity Test Result Choke Ln. Valves 1 2 1/16''P Inside Reel valves 1P HCR Valves 2 2 1/16''FP Kill Line Valves 5 2 1/16''P Check Valve 0NAACCUMULATOR SYSTEM: BOP Misc 3 4 1/16'' / swab P Time/Pressure Test Result System Pressure (psi)3000 P CHOKE MANIFOLD:Pressure After Closure (psi)2300 P Quantity Test Result 200 psi Attained (sec)26 P No. Valves 12 P Full Pressure Attained (sec)53 P Manual Chokes 1P Blind Switch Covers: All stations Yes Hydraulic Chokes 1P Nitgn. Bottles # & psi (Avg.): 4 @ 1900 P CH Misc 0NA ACC Misc 0NA Test Results Number of Failures:2 Test Time:7.5 Hours Repair or replacement of equipment will be made within Same days. Remarks: AOGCC Inspection 24 hr Notice Yes Date/Time 4/21/22 @ 02:14 Waived By Test Start Date/Time:4/22/2022 10:30 (date) (time)Witness Test Finish Date/Time:4/22/2022 18:00:00 pm BOPE Test Report Notify the AOGCC of repairs with written confirmation to: AOGCC.Inspectors@alaska.gov Austin McLeod Nabors Pit level alarms tested, LEL and H2S alarms tested. Verified flow through Micromotion. Bravo 5 leaked, greased and tested good. 2 3/8" combi showed pressure decrease on chart, re-tested on separate chart tested good. CZ Coyne/R. Beard Conoco Phillips Alaska C. Erdman/P. Klein KRU 1B-14A Test Pressure (psi): cdr3.companyman@conocophillips.com Form 10-424 (Revised 02/2022) 2022-0422_BOP_Nabors_CDR3AC_KRU_1B-14A 9 9 9 9 9 9 9 9 9 9 9 -5HJJ FP FP Bravo 5 leaked, 2 3/8" combi showed pressure decrease on chart, 4/22/22 333 West Seventh Avenue Anchorage, Alaska 99501-3572 Main: 907.279.1433 Fax: 907.276.7542 www.aogcc.alaska.gov Adam Klem Senior CTD Engineer ConocoPhillips Alaska, Inc. PO Box 100360 Anchorage, AK 99510-0360 Re: Kuparuk River Field, Kuparuk River Oil Pool, KRU 1B-14A ConocoPhillips Alaska, Inc. Permit to Drill Number: 222-021 Surface Location: 499' FNL, 532' FEL, SEC 9, T11N, R10E, UM Bottomhole Location: 4853' FNL, 2152' FEL, SEC 33, T12N, R10E, UM Dear Mr. Klem: Enclosed is the approved application for the permit to drill the above referenced well. This permit to drill does not exempt you from obtaining additional permits or an approval required by law from other governmental agencies and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the AOGCC reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the AOGCC specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or an AOGCC order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. Sincerely, Jeremy M. Price Chair DATED this ___ day of March, 2022. Jeremy Price Digitally signed by Jeremy Price Date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y Samantha Carlisle at 10:49 am, Feb 25, 2022 Adam Klem Digitally signed by Adam Klem Date: 2022.02.25 09:41:07 -09'00' 6)' 6)' '65 %23 WHVW WR SVLJ $QQXODU SUHYHQWHU WHVW WR SVLJ 97/ ͕>ϬϬϮϱϲϯϵ 6)' $YDULDQFH WR $$& E LV JUDQWHG WR DOORZ WKH NLFNRII SRLQW WR EH DQ\ SRLQW DORQJ WKH SDUHQW ODWHUDO 6)' ; dts 3/3/2022 JLC 3/3/2022 3/3/2022 Jeremy Price Digitally signed by Jeremy Price Date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¶IURPWKHRULJLQDOSRLQW $WWDFKHGWRSHUPLWWRGULOODSSOLFDWLRQVDUHWKHIROORZLQJGRFXPHQWV 3HUPLWWR'ULOO$SSOLFDWLRQ)RUPVIRU%$ %$/ 'HWDLOHG6XPPDU\RI2SHUDWLRQV 'LUHFWLRQDO3ODQVIRU%$ %$/ &XUUHQW:HOOERUH6FKHPDWLF 3URSRVHG&7'6FKHPDWLF ,I\RXKDYHDQ\TXHVWLRQVRUUHTXLUHDGGLWLRQDOLQIRUPDWLRQSOHDVHFRQWDFWPHDW 6LQFHUHO\ $GDP.OHP &RLOHG7XELQJ'ULOOLQJ(QJLQHHU &RQRFR3KLOOLSV$ODVND Adam Klem Digitally signed by Adam Klem Date: 2022.02.25 09:41:21 -09'00' .XSDUXN&7'/DWHUDO %$ %$/ Application for Permit to Drill Document 3DJHRI )HEUXDU\ :HOO1DPHDQG&ODVVLILFDWLRQ (Requirements of 20 AAC 25.005(f) and 20 AAC 25.005(b)) .................................................................................................................. 2 /RFDWLRQ6XPPDU\ (Requirements of 20 AAC 25.005(c)(2)) ................................................................................................................................................. 2 %ORZRXW3UHYHQWLRQ(TXLSPHQW,QIRUPDWLRQ (Requirements of 20 AAC 25.005 (c)(3)) ................................................................................................................................................ 2 'ULOOLQJ+D]DUGV,QIRUPDWLRQDQG5HVHUYRLU3UHVVXUH (Requirements of 20 AAC 25.005 (c)(4)) ................................................................................................................................................ 2 3URFHGXUHIRU&RQGXFWLQJ)RUPDWLRQ,QWHJULW\WHVWV (Requirements of 20 AAC 25.005(c)(5)) ................................................................................................................................................. 2 &DVLQJDQG&HPHQWLQJ3URJUDP (Requirements of 20 AAC 25.005(c)(6)) ................................................................................................................................................. 3 'LYHUWHU6\VWHP,QIRUPDWLRQ (Requirements of 20 AAC 25.005(c)(7)) ................................................................................................................................................. 3 'ULOOLQJ)OXLGV3URJUDP (Requirements of 20 AAC 25.005(c)(8)) ................................................................................................................................................. 3 $EQRUPDOO\3UHVVXUHG)RUPDWLRQ,QIRUPDWLRQ (Requirements of 20 AAC 25.005(c)(9)) ................................................................................................................................................. 4 6HLVPLF$QDO\VLV (Requirements of 20 AAC 25.005(c)(10)) ............................................................................................................................................... 4 6HDEHG&RQGLWLRQ$QDO\VLV (Requirements of 20 AAC 25.005(c)(11)) ............................................................................................................................................... 4 (YLGHQFHRI%RQGLQJ (Requirements of 20 AAC 25.005(c)(12)) ............................................................................................................................................... 5 3URSRVHG'ULOOLQJ3URJUDP (Requirements of 20 AAC 25.005(c)(13)) ............................................................................................................................................... 5 6XPPDU\RI&7'2SHUDWLRQV /LQHU5XQQLQJ 'LVSRVDORI'ULOOLQJ0XGDQG&XWWLQJV (Requirements of 20 AAC 25.005(c)(14)) ............................................................................................................................................... 6 'LUHFWLRQDO3ODQVIRU,QWHQWLRQDOO\'HYLDWHG:HOOV (Requirements of 20 AAC 25.050(b)) ..................................................................................................................................................... 6 $WWDFKPHQWV $WWDFKPHQW'LUHFWLRQDO3ODQVIRUWKH%$ %$/ODWHUDOV $WWDFKPHQW&XUUHQW:HOO6FKHPDWLFIRU%$ %$/ODWHUDOV $WWDFKPHQW3URSRVHG:HOO6FKHPDWLFIRUWKH%$ %$/ODWHUDOV 37'$SSOLFDWLRQ%$ %$/ 3DJHRI )HEUXDU\ :HOO1DPHDQG&ODVVLILFDWLRQ (Requirements of 20 AAC 25.005(f) and 20 AAC 25.005(b)) 7KHSURSRVHGODWHUDOVGHVFULEHGLQWKLVGRFXPHQWDUH%$ %$/7KHODWHUDOVZLOOEHFODVVLILHGDV ³Development´ZHOO /RFDWLRQ6XPPDU\ (Requirements of 20 AAC 25.005(c)(2)) 7KHODWHUDOVZLOOWDUJHWWKH$6DQGSDFNDJHLQWKH.XSDUXNUHVHUYRLU6HHDWWDFKHGIRUPIRUVXUIDFHDQG VXEVXUIDFHFRRUGLQDWHVRIWKH%$ %$/ %ORZRXW3UHYHQWLRQ(TXLSPHQW,QIRUPDWLRQ (Requirements of 20 AAC 25.005 (c)(3)) 3OHDVHUHIHUHQFHEORZRXWSUHYHQWLRQ%23VFKHPDWLFVRQILOHZLWKWKH&RPPLVVLRQIRU1DERUV&'5$& %23HTXLSPHQWLVDVUHTXLUHGSHU$$&IRUWKUXWXELQJGULOOLQJRSHUDWLRQV 3LSHUDPVEOLQGUDPVDQGWKH&7SDFNRIIZLOOEHSUHVVXUHWHVWHGWRSVLDQGWRSVL8VLQJWKH PD[LPXPIRUPDWLRQSUHVVXUHLQWKHDUHDRISVLIRXQGLQ%DW¶79'LHaSSJ (0:WKHPD[LPXPSRWHQWLDOVXUIDFHSUHVVXUHLQ%DVVXPLQJDJDVJUDGLHQWRISVLIWZRXOG EHSVL6HHWKH³Drilling Hazards Information and Reservoir Pressure´VHFWLRQIRUPRUHGHWDLOV 7KHDQQXODUSUHYHQWHUZLOOEHWHVWHGWRSVLDQGSVL 'ULOOLQJ+D]DUGV,QIRUPDWLRQDQG5HVHUYRLU3UHVVXUH (Requirements of 20 AAC 25.005 (c)(4) Reservoir Pressure and Maximum Downhole Pressure 5HTXLUHPHQWVRI$$&FD The formation pressure in KRU 1B-14 was observed at 3072 psi @ 6444’ TVD (9.2 ppg) during the recent SBHP performed (on 2/11/2022). The maximum downhole pressure in the 1B-14 vicinity is that of 1B-09 measured at 3103 psi @ 6305’ TVD (9.5 ppg – Measured 5/26/2020). Potential Gas Zones (Requirements of 20 AAC 25.005 (c)(4)(b)) 7KHRIIVHWLQMHFWLRQZHOOVWR%KDYHLQMHFWHGJDVVRWKHUHLVDSRVVLELOLW\RIHQFRXQWHULQJIUHHJDVZKLOH GULOOLQJWKH%$ %$/ODWHUDOV,IJDVLVGHWHFWHGLQWKHUHWXUQVWKHFRQWDPLQDWHGPXGFDQEHGLYHUWHG WRDVWRUDJHWDQNDZD\IURPWKHULJ Potential Causes of Hole Problems (Requirements of 20 AAC 25.005 (c)(4)(c)) 7KHPDMRUH[SHFWHGULVNRIKROHSUREOHPVLQWKH%$ %$/ODWHUDOVZLOOEHIRUPDWLRQLQVWDELOLW\DFURVV IDXOWV0DQDJHGSUHVVXUHGULOOLQJ03'ZLOOEHXVHGWRUHGXFHWKHULVNRIVKDOHLQVWDELOLW\DVVRFLDWHGZLWKIDXOW FURVVLQJV 3URFHGXUHIRU&RQGXFWLQJ)RUPDWLRQ,QWHJULW\WHVWV (Requirements of 20 AAC 25.005(c)(5)) 7KH%$ %$/ODWHUDOVZLOOEHGULOOHGXQGHU $$&IRUWKUXWXELQJGULOOLQJRSHUDWLRQVVRD IRUPDWLRQLQWHJULW\WHVWLVQRWUHTXLUHG maximum downhole pressure in the 1B-14 vicinity rr ) IRUPDWLRQLQVWDELOLW\DFURVV IDXOWV0 " 03'ZLOOEHXVHG () t 3103 psi @ 6305’ TVD (9.5 ppg – )) SRVVLELOLW\RIHQFRXQWHULQJIUHHJDVZ T formation pressure in KRU 1B-14 was observed at 3072 psi @ 6444’ TVD (9.2 ppg) p@ ( ppg) 37'$SSOLFDWLRQ%$ %$/ 3DJHRI )HEUXDU\ &DVLQJDQG&HPHQWLQJ3URJUDP (Requirements of 20 AAC 25.005(c)(6)) New Completion Details /DWHUDO1DPH/LQHU7RS 0' /LQHU%WP 0' /LQHU7RS 79'66 /LQHU%WP 79'66/LQHU'HWDLOV %$a¶¶/67/VORWWHGOLQHU %$/a¶/67/VORWWHGOLQHU Existing Casing/Liner Information &DWHJRU\2':HLJKW SSI*UDGH&RQQHFWLRQ7RS0'%WP0'7RS 79' %WP 79' %XUVW SVL &ROODSVH SVL &RQGXFWRU´+:HOGHG¶¶¶¶ 6XUIDFH´-%7&¶¶¶¶ 3URGXFWLRQ´´//7&¶¶¶¶ 'LYHUWHU6\VWHP,QIRUPDWLRQ Requirements of 20 AAC 25.005(c)(7) 1DERUV&'5$&ZLOOEHRSHUDWLQJXQGHU$$&IRUWKUXWXELQJGULOOLQJRSHUDWLRQV7KHUHIRUHD GLYHUWHUV\VWHPLVQRWUHTXLUHG 'ULOOLQJ)OXLGV3URJUDP (Requirements of 20 AAC 25.005(c)(8)) Diagram of Drilling System $GLDJUDPRIWKH1DERUV&'5$&PXGV\VWHPLVRQILOHZLWKWKH&RPPLVVLRQ Description of Drilling Fluid System :LQGRZPLOOLQJRSHUDWLRQV:DWHU%DVHG3RZHU9LVPLOOLQJIOXLGSSJ 'ULOOLQJRSHUDWLRQV:DWHUEDVHG3RZHU9LVPXGSSJThis mud weight will not hydrostatically overbalance the reservoir pressure, overbalanced conditions will be maintained using MPD practices described below. &RPSOHWLRQRSHUDWLRQV7KHZHOOZLOOEHORDGHGZLWKaSSJ1D%UFRPSOHWLRQIOXLGWRSURYLGH IRUPDWLRQRYHUEDODQFHDQGZHOOERUHVWDELOLW\ZKLOHUXQQLQJFRPSOHWLRQV Managed Pressure Drilling Practice 0DQDJHGSUHVVXUHGULOOLQJ03'WHFKQLTXHVZLOOEHHPSOR\HGWRPDLQWDLQDFRQVWDQWRYHUEDODQFHGSUHVVXUHRQ WKHRSHQKROHIRUPDWLRQDQGSURPRWHZHOOERUHVWDELOLW\WKURXJKRXWWKHFRLOHGWXELQJGULOOLQJ&7'SURFHVV0XG ZHLJKWLVQRWLQPDQ\FDVHVWKHSULPDU\ZHOOFRQWUROEDUULHU7KLVLVVDWLVILHGZLWKWKHSVLUDWHGFRLOHG WXELQJSDFNRIIDQG03'FKRNH%23(HTXLSPHQWSURYLGHVWKHVHFRQGDU\ZHOOFRQWURODVGHWDLOHGLQVHFWLRQ ³%ORZRXW3UHYHQWLRQ(TXLSPHQW,QIRUPDWLRQ´ ,QWKH%$ %$/ODWHUDOVRSHUDWLRQVZLOOWDUJHWDFRQVWDQW%+3RIaSSJ(0:DWWKHZLQGRZ7KH FRQVWDQW %+3 WDUJHW ZLOO EH DGMXVWHG WKURXJK FKRNH SUHVVXUH DQGRU PXG ZHLJKW LQFUHDVHV WR PDLQWDLQ RYHUEDODQFHGFRQGLWLRQVLILQFUHDVHGUHVHUYRLUSUHVVXUHLVHQFRXQWHUHG$GGLWLRQDOFKRNHSUHVVXUHRULQFUHDVHG PXGZHLJKWPD\DOVREHHPSOR\HGIRULPSURYHGERUHKROHVWDELOLW\$Q\FKDQJHRIFLUFXODWLQJIULFWLRQSUHVVXUH GXHWRFKDQJHLQSXPSUDWHVRUFKDQJHLQGHSWKRIFLUFXODWLRQZLOOEHRIIVHWZLWKEDFNSUHVVXUHDGMXVWPHQWV WDUJHWDFRQVWDQW%+3RIaSSJ(0:D This mud weight will not hydrostatically JS SSJgy overbalance the reservoir pressure, overbalanced conditions will be maintained using MPD p 37'$SSOLFDWLRQ%$ %$/ 3DJHRI )HEUXDU\ 3UHVVXUHDWWKH%$:LQGRZ¶0'¶79'8VLQJ03' 03'3UHVVXUH7DEOH3XPSV 2Q3XPSV2II $)RUPDWLRQ3UHVVXUHSVLSSJ %7DUJHW%+3DW:LQGRZSVLSSJ &0XG+\GURVWDWLFSVLSSJ '$QQXODU)ULFWLRQ(&'SVLSVLSVLIW &'0XG(&'&RPELQHG QRFKRNHSUHVVXUHSVLSVL $ &'2YHUEDODQFHG8QGHUEDODQFHGSVLSVL % &' &KRNH3UHVVXUH5HTXLUHGWR 0DLQWDLQ7DUJHW%+3DWZLQGRZ DQGGHHSHU SVLSVL 3UHVVXUHDWWKH%$/:LQGRZ¶0'¶79'8VLQJ03' 03'3UHVVXUH7DEOH3XPSV 2Q3XPSV2II $)RUPDWLRQ3UHVVXUHSVLSSJ %7DUJHW%+3DW:LQGRZSVLSSJ &0XG+\GURVWDWLFSVLSSJ '$QQXODU)ULFWLRQ(&'SVLSVLSVLIW &'0XG(&'&RPELQHG QRFKRNHSUHVVXUHSVLSVL $ &'2YHUEDODQFHG8QGHUEDODQFHGSVLSVL % &' &KRNH3UHVVXUH5HTXLUHGWR 0DLQWDLQ7DUJHW%+3DWZLQGRZ DQGGHHSHU SVLSVL $EQRUPDOO\3UHVVXUHG)RUPDWLRQ,QIRUPDWLRQ (Requirements of 20 AAC 25.005(c)(9)) 1$$SSOLFDWLRQLVQRWIRUDQH[SORUDWRU\RUVWUDWLJUDSKLFWHVWZHOO 6HLVPLF$QDO\VLV (Requirements of 20 AAC 25.005(c)(10)) 1$$SSOLFDWLRQLVQRWIRUDQH[SORUDWRU\RUVWUDWLJUDSKLFWHVWZHOO 6HDEHG&RQGLWLRQ$QDO\VLV (Requirements of 20 AAC 25.005(c)(11)) 1$$SSOLFDWLRQLVIRUDODQGEDVHGZHOO 37'$SSOLFDWLRQ%$ %$/ 3DJHRI )HEUXDU\ (YLGHQFHRI%RQGLQJ (Requirements of 20 AAC 25.005(c)(12)) (YLGHQFHRIERQGLQJIRU&RQRFR3KLOOLSV$ODVND,QFLVRQILOHZLWKWKH&RPPLVVLRQ 3URSRVHG'ULOOLQJ3URJUDP Requirements of 20 AAC 25.005(c)(13 Summary of CTD Operations :HOO%LVD.XSDUXN$&VDQGSURGXFHU,WZLOOEHHTXLSSHGZLWKò´WXELQJGXULQJDQXSFRPLQJ5:2WR IDFLOLWDWHD&7'H[LW7KH&7'VLGHWUDFNVZLOOXWLOL]HWZRODWHUDOVWRWDUJHWWKH$6DQGVWRWKH1RUWKDQG6RXWKRI %%ZLOOUHFHLYHD5:2LQ0DUFKRI 3ULRUWR&7'ULJXSVOLFNOLQHZLOOSXOOD5+&SOXJVHWGXULQJWKH5:2DQGLQVWDOOWKH*/'&RLOHGWXELQJZLOOWKHQ VHWDFHPHQWUHWDLQHUDWWKHHQGRIWKHWXELQJDQGFHPHQWXSLQWRWKH&VDQGSHUIRUDWLRQVWRLVRODWHWKH&VDQG IURPWKH&7'ODWHUDOV7KH%$ODWHUDOZLOOEHGULOOHGIURPa¶0'WRSODQQHG7'RI¶0'6ORWWHG OLQHUZLOOEHUXQIURP7'XSWRa¶0'7KH%$/ZLOOEHGULOOHGIURP¶0'DQGGULOOWR7'RI¶ 0'6ORWWHGOLQHUZLWKDVKRUW\GHSOR\PHQWVOHHYHZLOOEHUXQIURP7'XSWRa¶0'72:6 &7'3UH5LJ'ULOODQG&RPSOHWH%$ %$/6LGHWUDFNV4 3UH&7':RUN 6OLFNOLQH3XOO5+&SOXJSRVW5:2LQVWDOO*/' &786HWFHPHQWUHWDLQHUFHPHQWWXELQJWDLO 5LJ:RUN 0,581DERUV&'5$&ULJXVLQJ´FRLOWXELQJ18´%23(WHVW %$6LGHWUDFN D 0LOO´ZLQGRZDWa¶0' E 'ULOO´ELFHQWHUODWHUDOWR7'RI¶0' F 5XQǪ´VORWWHGOLQHUIURP7'XSWRa¶0' %$/6LGHWUDFN D 0LOO´ZLQGRZDWa¶0' E 'ULOO´ELFHQWHUODWHUDOWR7'RI¶0' F 5XQǪ´VORWWHGOLQHUZLWKVKRUW\GHSOR\PHQWVOHHYHIURP7'XSWRa¶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iner Running 7KH%$ %$/ODWHUDOVZLOOEHGLVSODFHGWRDQRYHUEDODQFLQJIOXLGaSSJ1D%USULRUWR UXQQLQJOLQHU6HH³Drilling Fluids´VHFWLRQIRUPRUHGHWDLOV :KLOHUXQQLQJ´VORWWHGOLQHUDMRLQWRI´QRQVORWWHGWXELQJZLOOEHVWDQGLQJE\IRU HPHUJHQF\GHSOR\PHQW$IORRUYDOYHLVPDGHXSRQWRWKLVMRLQWDKHDGRIWLPHDQGWKHULJFUHZ FRQGXFWVDGHSOR\PHQWGULOOZLWKWKLVHPHUJHQF\MRLQWRQHYHU\VORWWHGOLQHUUXQ7KH´UDPVZLOO SURYLGHVHFRQGDU\ZHOOFRQWUROZKLOHUXQQLQJ´OLQHU 'LVSRVDORI'ULOOLQJ0XGDQG&XWWLQJV Requirements of 20 AAC 25.005(c)(14 x 1RDQQXODULQMHFWLRQRQWKLVZHOO x $OOVROLGZDVWHZLOOEHWUDQVSRUWHGWRWKHJULQGDQGLQMHFWIDFLOLW\DW'63UXGKRH%D\IRUGLVSRVDO x ,QFLGHQWDOIOXLGVJHQHUDWHGIURPGULOOLQJRSHUDWLRQVZLOOEHLQMHFWHGLQD.XSDUXN&ODVV,,GLVSRVDOZHOO5 RU%GLVSRVDOIDFLOLWLHVRU3UXGKRH'6LID.XSDUXNIDFLOLW\LVXQDYDLODEOH x $OOZDVWHVDQGZDVWHIOXLGVKDXOHGIURPWKHSDGPXVWEHSURSHUO\GRFXPHQWHGDQGPDQLIHVWHG x &RQWDFW.XSDUXN(QYLURQPHQWDO&RRUGLQDWRUIRUTXHVWLRQVUHJDUGLQJZDVWHFODVVLILFDWLRQ 'LUHFWLRQDO3ODQVIRU,QWHQWLRQDOO\'HYLDWHG:HOOV (Requirements of 20 AAC 25.050(b)) 7KH$SSOLFDQWLVWKHRQO\DIIHFWHGRZQHU 3OHDVHVHH$WWDFKPHQW'LUHFWLRQDO3ODQV 0DJQHWLFDQGLQFOLQDWLRQVXUYH\VZLOOEHWDNHQHYHU\IW1RJ\URZLOOEHUXQ 0:'GLUHFWLRQDOUHVLVWLYLW\DQGJDPPDUD\ZLOOEHUXQRYHUWKHHQWLUHRSHQKROHVHFWLRQ 'LVWDQFHWR1HDUHVW3URSHUW\/LQHPHDVXUHGWR.3$ERXQGDU\DWFORVHVWSRLQW /DWHUDO1DPH'LVWDQFH %$¶ %$/¶ 'LVWDQFHWR1HDUHVW:HOOZLWKLQ3RRO /DWHUDO1DPH'LVWDQFH:HOO %$¶+ %$/¶$/ 37'$SSOLFDWLRQ%$ %$/ 3DJHRI )HEUXDU\ $WWDFKPHQWV Attachment 1: Directional Plans for the 1B-14A & 1B-14AL1 laterals Attachment 2: Current Well Schematic for 1B-14A & 1B-14AL1 laterals Attachment 3: Proposed Well Schematic for the 1B-14A & 1B-14AL1 laterals /DVW7DJ $QQRWDWLRQ 'HSWKIW.% (QG'DWH :HOOERUH /DVW0RG%\ /DVW7DJ&RUUHFWHGWR5.% % IHUJXVS /DVW5HY5HDVRQ $QQRWDWLRQ (QG'DWH :HOOERUH /DVW0RG%\ 5HY5HDVRQ'XPP\RIIVWULQJ % IHUJXVS &DVLQJ6WULQJV &DVLQJ'HVFULSWLRQ &21'8&725 2'LQ ,'LQ 7RSIW.% 6HW'HSWKIW.% 6HW'HSWK79'« :W/HQO« *UDGH + 7RS7KUHDG :(/'(' &DVLQJ'HVFULSWLRQ 685)$&( 2'LQ ,'LQ 7RSIW.% 6HW'HSWKIW.% 6HW'HSWK79'« :W/HQO« *UDGH - 7RS7KUHDG %7& &DVLQJ'HVFULSWLRQ 352'8&7,21[ # 2'LQ ,'LQ 7RSIW.% 6HW'HSWKIW.% 6HW'HSWK79'« :W/HQO« *UDGH / 7RS7KUHDG /7&02' 7XELQJ6WULQJV 7XELQJ'HVFULSWLRQ 78%,1* [[[ 6WULQJ0D« ,'LQ 7RSIW.% 6HW'HSWKIW« 6HW'HSWK79'«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«$2:&« 2,/'2« 2,/:$« %$6(+«.$/8%,«833(5« .0$«/2:(5« .83$5«81,7'« 81,7&«&,17«&%6« &$6«&,17«&,17« &,17«&%6«&$6« 81,7%«%,17« %,17« %,17«%,17« %,17« 81,7$«$,17« $,17«$68«$68« $,17«$68« $68« $68«$,17«$68«$68« $68«$,17«$,17«0,/89(« )/2$76+2( &$6,1* )/2$7&2//$5 ,3(5) :/(* 78%,1*383 1,33/( 78%,1*383 ;25HGXFLQJ &$6,1*6($/$66< 3$&.(5 1,33/( 78%,1*383 6/((9(& 78%,1*383 78%,1* 78%,1*383 $3(5) %/$675,1*6 $3(5) ;27+5($' 78%,1* ;25('8&,1* ;25HGXFLQJ 78%,1*383 6/((9(2 78%,1*383 352'8&7,21 78%,1*383 78%,1* 78%,1*383 3$&.(5 3%5 78%,1*383 78%,1* 78%,1*383 *$6/,)7 78%,1*383 78%,1* 78%,1*383 *$6/,)7 78%,1*383 78%,1* 78%,1*383 *$6/,)7 78%,1*383 78%,1* )/2$76+2( &$6,1* )/2$7&2//$5 78%,1*383 *$6/,)7 78%,1*383 &$6,1* 78%,1* &$6,1* 78%,1*383 *$6/,)7 78%,1*383 78%,1* ;25HGXFLQJ 78%,1* 78%,1*383 6$)(7<9/9 78%,1*383 &$6,1* 78%,1* &21'8&725 78%,1*63$&(2873836 78%,1* +$1*(5 +$1*(5 .83352' .%*UGIW 5LJ5HOHDVH'DWH % 7' $FW%WPIW.% :HOO$WWULEXWHV )LHOG1DPH .83$58.5,9(581,7 :HOOERUH$3,8:, :HOOERUH6WDWXV 352' 0D[$QJOH 0' ,QFO 0'IW.% :(//1$0( :(//%25(% $QQRWDWLRQ /DVW:2 (QG'DWH +6SSP 'DWH &RPPHQW 666975'3 !" #$% & !" '''() *+*!,-./01-!"2 &3204/"13!4)5 5 55 64/0/ 4)73/89 '::4-%2; 2;!)789 1-./01/4) < 6$ : = %4,)5 #$%: = %4,)5 7UXH9HUWLFDO'HSWKXVIWLQ 9HUWLFDO6HFWLRQDWXVIWLQ%%$ ZS7,3IURP%.237RSRI:KLSVWRFN7'6(&7,21'(7$,/66HF0' ,QF $]L 79'VV16(: 'OHJ 7)DFH96HFW :(// '(7$,/6 %16 (: 1RUWKLQJ (DVWLQJ /DWLWWXGH /RQJLWXGH 1 :3URMHFW .XSDUXN5LYHU8QLWB6LWH .XSDUN%3DG:HOO %:HOOERUH %$3ODQ %$ZS:(//%25('(7$,/6 %$3DUHQW :HOOERUH %7LHRQ0' $]LPXWKVWR7UXH1RUWK0DJQHWLF1RUWK0DJQHWLF)LHOG6WUHQJWKQ7'LS$QJOH'DWH0RGHO %**0706RXWK1RUWKXVIWLQ :HVW(DVWXVIWLQ%%$ZS7,3IURP%.237RSRI:KLSVWRFN7'5()(5(1&( ,1)250$7,21&RRUGLQDWH1(5HIHUHQFH :HOO%7UXH1RUWK9HUWLFDO79'5HIHUHQFH 0HDQ6HD/HYHO6HFWLRQ965HIHUHQFH 6ORW1(0HDVXUHG'HSWK5HIHUHQFH %#XVIW%&DOFXODWLRQ0HWKRG 0LQLPXP&XUYDWXUH%$ZS%$ZS 3URMHFW .XSDUXN5LYHU8QLWB6LWH .XSDUXN%3DG:HOO %:HOOERUH %$3ODQ %$ZS:(//%25('(7$,/6 %$3DUHQW :HOOERUH %7LHRQ0' $]LPXWKVWR7UXH1RUWK0DJQHWLF1RUWK0DJQHWLF)LHOG6WUHQJWKQ7'LS$QJOH'DWH0RGHO %**0706RXWK1RUWKXVIWLQ :HVW(DVWXVIWLQ6RXWK1RUWKXVIWLQ :HVW(DVWXVIWLQ%/%%%%% %%%%%%%/%/3%%3%%% % %%%%%$%$/%$/3%%$3%%%%%:6: :6::6 ::6::6::6::6::6::6::6 ::6:$$$$$$$$/$$/3%$$$$$$$$$ $$$$5'$ $$ $$/$/$/$ $$$$$$**/*/*/*$**/*/*/3%**+++/ +++$+%+++%$ZS7,3IURP%.237RSRI:KLSVWRFN7'5()(5(1&( ,1)250$7,21&RRUGLQDWH1(5HIHUHQFH :HOO%7UXH1RUWK9HUWLFDO79'5HIHUHQFH 0HDQ6HD/HYHO6HFWLRQ965HIHUHQFH 6ORW1(0HDVXUHG'HSWK5HIHUHQFH %#XVIW%&DOFXODWLRQ0HWKRG 0LQLPXP&XUYDWXUH%$ZS !" # $% " & ' $% ( ) !* +) ! , ) -. , ) % /0 # 1 1 " ! ) 2 0 ! # "#$ # %&' 2 , ) (#)*## +,- 0 , ) . & 2# * 3 * ( ) 24 # * * /)0,%12 - /)0,33 - 4 5 4 6# ! .+ 2 2 2+2 # * + + # &) 0 5# 3 !" ) + + + 7#*$8 ##*### '4/9/499*0) '/4'0*$/ #*## 0#7/:#*)/# /7$':'9*#'9. 1 1 # + + 5# 0 + 6571 67 # &) + + +3+ " + + #*## #*## '4/9/490*# '/4/#*$ #*##1 0 5 " +#*## 0#7/:#*)9$ /7$':)*8$#. 1 ) 89: 0 8-: * 89: 2 * 2 )# ;;)#) <<)#)) '*#0 8#*9/ '04)9)*8 0# . # # # "#$ ! . ) ) 0*8-. : 8#,: 67 8#,: ) 89: 6571 8#,: - ; 0/498#*# '*###*###*##9*$# ( ) !* +) ! , ) -. , ) % /0 # 1 1 " ! ) 2 0 ! # "#$ # %&' 2 , ) (#)*## +,- 0 , ) . & <) 89: = *0 89: 6571 8#,: -; 89: 67 8#,: 2 # 0 8#,: -. # * 8#,: 897#,: 897#,: - 897#,: ) # - #*###*###*###*##48*8#4/)9*/894*'9$)*/)$8*$/498#*# 0*/#*#*'/#*9#4'#*'/4/0)*94''*9$)*0/$0*9#/400#*## #*###*##$'*##$'*##49#*))4/8'*0/94'$*0$)*0/9*$'/40/'*## #*###*##'*##'*##4))0*'4#8*##94'99*$)*0/#$*##/4/)#*8/ 8)*##'*99$*9'*##490*8/'4)9*/#94'0*#$9/*#/*9'#4'#*## #'*##9*0'*800*##$4/)*9'4$0*)994'#9*889*)88/*//#4##*## 88*##'*###*0'*##$4$*)'4)*9#94'#$*)*)0/#*8$#4/##*## /#*##'*###*#'*##$4#/*#'499*#'94/8*)#/$*00/#*0/4)'#*## )'*##*#)*89'*##)48/9*$9'4$8*094'#'*$#*/08'*#04'#*## 9#*##*$$)*')'*##)40)8*$#'4#/*)/94'$*09#/*'8/*849)'*## 8#*##9*8/*)0*##)4'8$*)#'4#'*94')*0'//*)#/*$#400'*## /#*##0*###*#)0*##)4$8$*/#'4#9*94'#8*)08'*)#/*)94/0'*## #0*##9*0#)*#'0*##)488*'4#89*/94'*#)0*880*0)40'*## 8#*##9*8/*)0*##)4##0*8#'40#*0'94'9*'/'8*#)8/*99)4$0'*## 88*##0*###*)0*##40$)*''4''*894''*'$#*#/#*9)400'*## 9#*##9*#/$*80*##4998*/'4'/#*094'#0*#$)#*//'*89)4/)'*## /'*##0*###*980*##49)$*8#'40'8*994/#*/$8*90/*99$4##*## '*##*'$)*$'*##49#/*)'4/'0*90948)*#8$'/*9/#*#$4$##*## #'*##*8$*)/'*##49$0*$94)#'*''9480*$/$0*'$80*8$4''#*## ( ) !* +) ! , ) -. , ) % /0 # 1 1 " ! ) 2 0 ! # "#$ # %&' 2 , ) (#)*## +,- 0 , ) . & 2 # 0 8#,: <) 89: = *0 89: 6571 8#,: . ) ) 8#,: 897#,: 67 8#,: " -. # * 8#,: 2 0 8#,: 2 5# 8#,: - ,) = *0 89: /498#*# $8*$ $)*/) 94*'9 '0*0 #*##4/)9*/8 48*8# '4/04'9*#$ ''40'/*$'#*## -<,* /40##*## $8*# $)*8/ 949#*$# '0$*'/ #*9#4/$0*#9 4)'*88 '4/04''9*#0 ''40')*)#0*/ /400#*## $0*9# $)*0/ 94''*9 '8#*/) #*9#4/0)* 4'#*'/ '4/04'/#*/8 ''40)0*)90*0 $;-,10 #)% /40/'*## 9*$' $)*0/ 94'$*0 '8$*09 $'*##4/8'*0/ 49#*)) '4/049#*'9 ''400*'#*## /48##*## 8*9# $)*0/ 94'$0*'' '8*$/ '*##4/88*8# 49)*$' '4/049#0*'9 ''40'*$/#*## /4/##*## /$*9# $)*0/ 94'9/*) 9##*#0 '*##'4#9*$ 4)'*' '4/0498)*') ''499*0#*## /4/)#*8/ #$*## $)*0/ 94'99* 9#$*'8 '*##'4#8*## 4))0* '4/049//*$ ''49/*0$#*## #4###*## #'*8 *0 94'9*) 9$8*/' '*##'4')*/8 4)/*$0 '4/0400* ''49)0*)/8)*## #4##*## //*8) 0*$ 94')$*# 0)0*08 '*##'4)$/*# 4)#/*80 '4/048'0*' ''4999*))/*)$ #4'#*## /*9' 9/*# 94'0*#$ 00'*0# '*##'4)9*/# 490*8/ '4/0488$*'/ ''40#8*##*0# #4)##*## /$*0 0)*08 94'$*$0 8)#*8 0*##'4)8*#9 4)#*0$ '4/04/##*#9 ''40''*#0#'*## #4$##*## /*88 0/*' 94'#8*0 /#'*8/ 0*##'4$#*/$ 4#)$*8# '4/04/)*'0 ''48'*8)#'*)' #4##*## 8/*// 89*)8 94'#9*8 /8*0$ 0*##'4$0*)9 $4/)*9 '4/04/$0*'9 ''4/'#*8/#'*'8 #4'##*## /#*9 /*)8 94'#9*0) 4#'9*/ '*##'4$/*$/ $48)*0# '4/04/#*$9 '94#'#*8#88*## #49##*## /#*$$ /9*)8 94'#9*)8 4))*0/ '*##'4$)*8 $40)*/' '4/04/$* '94'#*'/88*# #40##*## /#*'# #*)0 94'#'*'' 48*89 '*##'4)/0*'9 $49)9*' '4/04//*8' '94)/*088*#$ #48##*## /#*90 #9*)0 94'#*') 4)$$*9/ '*##'4)0$*09 $4')/*#9 '4/048/9*0# '94$9*088*#9 #4/##*## /#*8$ *)0 94'#$*) 4)00*80 '*##'4)*9# $4$*) '4/0489'*0 '94*'988*) 4###*## /#*8$ #9*)0 94'#*09 4$))*#' '*##'4)#/* $4$$/*08 '4/048$$*9' '94'$9*#/#*## 4##*## /#*8) #*)0 94'##*$) 4$0$*88 '*##'48'*9' $4))*9/ '4/048#*' '949$$*9$/#*#0 4)##*## /#*8# /9*)0 94/8*/# 4$)*/0 '*##'40#*) $4$*/# '4/040/'*/$ '940$)*'/#* 4)'#*## /#*0/ /$*00 94/8*)# 49'*#/ '*##'499*#' $4#/*# '4/040/*8/ '9408)*$/#*)) 4$##*## 8/*$9 /'*8 94/8*$ 4/0*$0 '*##'49*80 $4#*)8 '4/04088*#' '948$)*8)'*## 4##*## 89*'# //*/) 94'#*0' 4''0*98 '*##'48*) )4/'*$ '4/0400'*# '94/$*)))'*## 4'#*## 8'*#0 #*/0 94'#'*$ 4'8'*9# '*##'4$8*0 )48/9*$9 '4/0409'*/# '94/8#*)$)*8' 4'##*## 89*$) #* 94'#/*8 49*/8 '*##'4)0*8 )480*0/ '4/040'*/9 '04#)8*809#*## 49##*## 88*8 #8*0 94'$*# 49'/*/$ '*##'4#//*$ )40'*/$ '4/040)0*'9 '04)*/'/*8 49)'*## 8/*8 #/*' 94'$*09 490#*8/ '*##'4#/*)/ )40)8*$# '4/040/*'8 '048*'/'/*9' 40##*## /#*$/ #*$0 94'$*8' 40#9*$ 0*##'4#9/*) )49'9*'/ '4/049/8*/ '04))#*8#*## 400'*## /*$# //*)# 94')*0' 400*/ 0*##'4#'* )4'8$*)# '4/0498$*$9 '04)/$*/)0/*// 48##*## /*$# /0*' 94')*8 409)*) 0*##'4#'#*/ )4''8*0 '4/0490/*/# '04$8*90/#*## 4/##*## /*)8 /#*' 94'#/*/$ 48)0*0$ 0*##'4#$*9# )4'8*8# '4/0490$*98 '048*$8/#*# 4/0'*## /*)9 8'*)# 94'#8*)0 488)*0# 0*##'4#9* )4$8$*/# '4/04900*#) '04/$*)'/#*)# )4###*## /#*0' 8$*'$ 94'#0*8$ 4/#)*#$ 0*##'4#8*/# )4$'/*#) '4/0490/*9 '04'8*#0*## )4##*## 88*0# 09*8$ 94'#8*$) 4/8$*0 0*##'4#9'*/ )4)9#*'' '4/049/0*$ '0499*'#0*#$ )40'*## 80*0 0*8 94'*#) )4#/*# 0*##'4#89*/ )488* '4/0408*#0 '04988*'#0*## )4)##*## 80*0 0#*#8 94')*/ )4#0*/ 0*##'4#/*$ )49*8 '4/040)9*$8 '040*//8#*## )4$##*## 88*0 9$*/ 94''*') )49*$ 0*##'4$$*/9 )4#0$*) '4/04099*9# '048#$*0/*/) )4$0'*## 8/*99 '8*#) 94'9*'/ )4)$9*' 0*##'40#*0' )4##0*8# '4/048#$*8) '04898*00/*9/ )4##*## 8/*0) '9*)0 94'9*0) )4)9#*/8 0*##'48*$ 4/89*8# '4/0480*') '0488/*$888*## )4'##*## 8/*/0 /*)8 94'0*## )4$9#*## 0*##'4)*00 4/#0*)) '4/04808*'# '04/98*''80*// )49##*## /#*) )*)8 94'9*8 )4'/*/$ 0*##'4$*9 48$'*9# '4/04/8*99 '84#$/*0#80*/0 )40##*## /#*9 $'*)/ 94'9*)9 )4''/*)8 0*##'4$/)*$9 400$*## '4/0'4#)9*/0 '84#*0080*/8 )400'*## /#*9 $#*# 94''*' )49$)*') 0*##'4''*8 40$)*' '4/0'4#/#*$ '84*888*#) )48##*## /*' )8*') 94''*#0 )49'9*'8 0*##'400*)8 40)#*$ '4/0'4)*)) '84'$*8/9#*## )4/##*## /*// ))* 94'#/*$/ )40'#*9) 0*##'4'90*$' 4900*$8 '4/0'4)#)*'9 '84/9*))9#*#$ )4/)'*## /'*89 )#*/ 94'#0*#$ )400$*8 0*##'4'/#*0 4998*/ '4/0'4))'*0' '84)#'*)99#*$0 $4###*## /'*$8 '*99 94//*9/ )48#*) 0*##'499*$) 49*08 '4/0'4)/9*0 '84))8*//'*## $4##*## /*99 8*90 94/#*/$ )4/)$*00 0*##'40'8*9 49)$*8# '4/0'4$/*/ '84)8*'/'*' $4)##*## /)*' *$ 948*9 $4##*0 '*##'48'0*0/ 49)*9/ '4/0'4/$*# '84)'8*/0'*## $4$##*## /#*# $'/*9 948)*#8 $4#0*90 '*##'4/'0*90 49#/*) '4/0'4'/$*)/ '84)9*'0'*)/ ( ) !* +) ! , ) -. , ) % /0 # 1 1 " ! ) 2 0 ! # "#$ # %&' 2 , ) (#)*## +,- 0 , ) . & 2 # 0 8#,: <) 89: = *0 89: 6571 8#,: . ) ) 8#,: 897#,: 67 8#,: " -. # * 8#,: 2 0 8#,: 2 5# 8#,: - ,) = *0 89: $4##*## 8/*# $'*08 948)*' $4*8) '*##94#'0*') 49*$ '4/0'49/$*# '84)'9*#)#'*## $4'##*## 80*8) $/*/' 948'*)# $4)#)*0 '*##94'9*'9 49)0*'8 '4/0'40/)*# '84))*#/#*/8 $4''#*## 80*8 $0*'$ 9480*$/ $4)$#*)) '*##94)#'*'' 49$0*$ '4/0'48#*/9 '84)$)*##*8' - ( ) !* +) ! , ) -. , ) % /0 # 1 1 " ! ) 2 0 ! # "#$ # %&' 2 , ) (#)*## +,- 0 , ) . & - * 0 7* ## 0 -. 8#,: 0 8#,: 5# 8#,: 67 8#,: 6571 8#,: - # + + 89: > 89: &$*/ 94/*## '4/0'4$88*$ '8488*$9'40'$*/ 498*###*## #*##0#7)#:$9*8 /7$9:$)*#)8. 2 =>'8*9 +$#8)*#' +,9/)*&?4'0#*/849)9*9/%- &$* 94')*## '4/04'/0* ''40))*$/4/08*9# 4''*)#*## #*##0#7)#:)/*)9 /7$0:*)8. 2 =>#*88 +/08*9 +,9')*'0&?4/08*)4'*80%- &$* 9488*## '4/0'48)*$$ '84)/*$99488*' 4'0'*#/#*## #*##0#7)#:*)' /7$9:)8*8/. 2 =>9*' +$'##*## +,98'*)#&?49'9*'949)0*'8%- &$*8 94''*## '4/0'4##*$' '84'*$9'49'*99 40'8*/)#*## #*##0#7)#:$*#9 /7$9:$*)'. 2 =>)0*/' +)09/*$ +,9''*9#&?4''#*'/40$'*$/%- &$* 94/8*## '4/040/#*$8 '94098*$8'49*9$ $4#8*#0#*## #*##0#7)#:$*#' /7$0:$*9)'. 2 =>)*' +)$9*) +,9/8*$/&?4'90*#4$#0*8'%- > #*## '4/04)$*) ''48#*$848#9*) 4$/8*9##*## #*##0#7)#:)0*'/ /7$0:'*$/. 2 =>9'*09 +/98#*# +,9*'9&?4/)9*/848*8#%- > #*##'4/04)$*) ''48#*$8#*## #*## #*)#)'4/048$)* ''4$#$*$0#*## 0*$ 0')*$'4/0'409*) ''49)$*$#*## 0*/8 08'*0)'4/0'4)*9 '94)8/*$#*## 8*)8 '0*9'''4/0'4##9*' '04)#9*$9#*## 40)/*/8 '80*9/9 '4/0'4#)'*') '049'*$9#*## )408* 0/*)0 '4/0'4)$$*' '04809*$'#*## )4#*'$ 4$*908 '4/0'4''$*' '04/99*$$#*## )4/$*9' 4$'9*88/'4/0'40/9*'' '04/$8*$#*## )490*)' 4$*/0#'4/0'4800*'9 '84$0/*$#*## )4/#8*8) 4#00*0$'4/0'4')#*'9 '84*$$#*## )4/$8*9 90)*$#)'4/0'4*'9 '84$)#*$'#*## )48*08 $/8*$9$'4/048$/*'' '84'0*$0#*## )490/*/' 0*'0'4/049#*' '048)#*$0#*## )4$* $9*'''4/04$/8*'# '04))$*$/#*## 40)*/0 8)*899 '4/04'$*0 '94'9$*$8#*## 4#8$*98 $))*/'0 '4/040/* ''4/'*$0#*## 90*/ #*##8 '4/04)$*) ''48#*$8#*## #*## &$*' 94'$*## '4/0408*$8 '04')*$8'4#/#*#0 )40)*')#*## #*##0#7)#:$#*$/ /7$0:)*)#. 2 =>#*8 +9)8*/0 +,9'$*8#&?4'#8/*/04)0)*'9%- &$*9 94'#8*## '4/049'$*$0 '04/8*$0'4#))*09 )4$08*/#*## #*##0#7)#:)/*9'8 /7$9:')*$). 2 =>)*#$ +/00*9) +,9'#8*)&?4'#9*904)$8*)/%- &$*# 948)*## '4/0'4'/8*$ '84)$8*$9'4/9)*80 49$)*9##*## #*##0#7)#:$8*/#9 /7$9:$#*')8. 2 =>)$* +$$#9*$$ +,98)*#&?4'/9*##49#/*8%- &$*) 94'*## '4/049/8* ''49'#*$/'4#8#*#/ 4))9*09#*## #*##0#7)#:$#*) /7$0:9*$#. 2 =>'$*8/ +//$*9 +,9'9$*#$&?4'#/*/)4)$*)8%- &$*0 94'0*## '4/040'0*$9 '04899*$9'4)*$ )4##*))#*## #*##0#7)#:$#*9'8 /7$9:*''. 2 =>$8*' +)$'#*# +,9'9*$0&?4''0*884)#)/*)%- &$*$ 94'#9*## '4/04/8*# ''4/)$*$/'4$)8*)8 $4/')*#0#*## #*##0#7)#:$)*9'9 /7$0:$8*)8$. ( ) !* +) ! , ) -. , ) % /0 # 1 1 " ! ) 2 0 ! # "#$ # %&' 2 , ) (#)*## +,- 0 , ) . & 2 =>$*)) +#$0*' +,9'#9*/'&?4'$'*/4$/'#*%- . ) 0 8#,: 2 # 0 8#,: !# * 8 : / * 8 :* !# # )$<8@9480*$/$4''#*##)*$0' $*### 2 # 0 8#,: . ) 0 8#,: 6571 8#,: 67 8#,: +) ! # !** # /498#*# 94*'9 4/)9*/8 48*8# &A+ /400#*## 94''*9 4/0)* 4'#*'/ 3&+.5 2 $4''#*## 9480*$/ 94)#'*'' 49$0*$ & !" "# $ "#%" "#%" "#%" &' # () * %$ +, , !-./+, ! "0, # $%&$$' ()1/+, *+, +2+,$&$$ '3, ! 1$,+4, 5 %&$$ , 43,$&$$ ' +4/ ,-.+ / * 0'' . +/), 1$2 5++-./+, 1$, / ), + 31$, 1$, 3+ , , + !& * 3 4* * ! 5 0 6 +- -.7 1 1 %$$89 $$:$$$ ' ' . ! %/&$$' ;<=>$&$ 2<//$&$$' ? ' 2<$$$&$$' 1$2 *$ , ) 4 )* 3 $ , %&@; *** - A )1$, 6+7 -) /-2 647 - 6+7 / %:%:%$%% . 0 5 0 5 . * *=@&2% ;<=>$&$ () . 0 5 0 5 . * *;<=>$&$ 2<//$&$$ 1$2 () 5++4%4%/) + 1 $ / 6+7 5++ 1 $ / 6+7 #& 6+7 #& 3 6+7 4 ) 2 / * $2 $2 $2 0 ' , $ $ $0 ' , $/ $/ $/0 ' , $= $= $=0 ' , < - < 6$; $; $;%<=@@&/; ><//$&$$ <%$$&/ ;;$&$ /&@$@ $ $ $0 ' , $ $ $0 ' , - $ $ $ 2<$$$&$$ ;<=%/&$$ 2<%&$ %<@>/&% ;&/$ $ $ $ 2<$$$&$$ ;<=/$&$$ 2<%&2 %<@>=&$$ ;&/2 - $ $ $ 2<$$$&$$ ;<=%/&$$ 2<%&$ %<@>/&% ;&/$ $ $ $ 2<$$$&$$ ;<=/$&$$ 2<%&2 %<@>=&$$ ;&/2 6$ $ $ 2<$%@&% ;<@/&$$ 2<22&$/ %<@;;&>% ;&$% 6$ $ $ 2<$%@&% ;<@/&$$ 2<22&$/ %<@;;&>% ;&$% $ $ $ 0 ' , 0 ' , 2 2 2 0 ' , 2 2 2 0 ' , 2 2 % 2 %0 ' , < - <%$$&$$ @<>@/&$$ <@;&=; <@;&%@ <%&2$$ 6 <;/$&$$ =<2%/&$$ %<;>;&/ %<;>&%2 2/;&@ / / /0 ' , / / /0 ' , / / / 0 ' , / / % / %0 ' , / / % / %0 ' , / / %% / %%0 ' , / / 2 / 2 0 ' , / / 2 / 20 ' , = = =0 ' , 6= = =%<@/&$$ @<=/$&$$ 2<==&== %<;=@&$% /&>= = = =%<%$$&$$ @<%/&$$ 2<$@%&/ %<>>@&@= =&=2= - = = =%<%$$&$$ @</$&$$ 2<$@%&> %<>>/&>; =&$ * !, < 6 ' < - # () * %$ +, , !-./+, ! "0, # $%&$$' ()1/+, *+, +2+,$&$$ '3, ! 1$,+4, 5 %&$$ , 43,$&$$ ' +4/ ,-.+ / * 0'' . +/), 1$2 5++-./+, 5++4%4%/) + 1 $ / 6+7 5++ 1 $ / 6+7 #& 6+7 #& 3 6+7 4 ) 2 / * < - < 6= = = %<@/$&$$ ;<=;2&$$ %</&>= <;%$&2 ;&/; < - < 6= = = %<//$&$$ ><>>=&$$ %<%@&% %<%/=&/> &%2% = = =%<%$$&$$ @<$$&$$ 2<2$&== %<;=&=% @&$$ - = = =%<%$$&$$ @<%/&$$ 2<2%&= %<;=&%> =&>%/ 6= = =%<%$$&$$ @<@>&$$ 2<=&2/ %<;//&@$ =&/$ > > >0 ' , > > >0 ' , > > > 0 ' , > > % > %0 ' , > > 2 > 2 0 ' , > > 2$ > 2$0 ' , > > 2 > 20 ' , ; ; ;0 ' , ; ; ; 0 ' , ; ; $ ; $0 ' , ; ; $% ; $%0 ' , $ $ $0 ' , $2 $2 $2 0 ' , $ $ $0 ' , $/ $/ $/0 ' , $= $= $=0 ' , $@ $@ $@ 0 ' , $> $> $>0 ' , $; $; $;0 ' , * !, < 6 ' < - # () * %$ +, , !-./+, ! "0, # $%&$$' ()1/+, *+, +2+,$&$$ '3, ! 1$,+4, 5 %&$$ , 43,$&$$ ' +4/ ,-.+ / * 0'' . +/), 1$2 5++-./+, $ >/$ @$$ %//$ 2$$ $ %/$$ /$$$ @/$$ $$$$ %/$$ /$$$ * . ** $< $ < $ A$ $;< $;< $; A% $< $ < $ A$ < < A$ =< =< = A$ =< = < = A$ =< = < = A$ =< =< = A$ - 5 - 3 . * ! 7 * " ;>2< B 5* !, ' 7 $&2>C * /$C $8 $&$$$ 0'' . ! 0'' . ' . ! # $%&$$' () * !, < 6 ' < - # () * %$ +, , !-./+, ! "0, # $%&$$' ()1/+, *+, +2+,$&$$ '3, ! 1$,+4, 5 %&$$ , 43,$&$$ ' +4/ ,-.+ / * 0'' . +/), 1$2 5++-./+, $&$$ 2&$$ =&$$ ;&$$ 6 $ %/$$ /$$$ @/$$ $$$$ %/$$ * . 3 0 + * +0 ., 6 $< $ < $ A$ $;< $;< $; A% $< $ < $ A$ < < A$ =< =< = A$ =< = < = A$ =< = < = A$ =< =< = A$ - 5 - 3 . * ! 7 * " ;>2< B 5* !, ' 7 $&2>C * /$C $8 $&$$$ 0'' . ! 0'' . ' . ! # $%&$$' () * !, < 6 ' < - 5HYLVHG 75$160,77$//(77(5&+(&./,67 :(//1$0(BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB 37'BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB BBB'HYHORSPHQWBBB6HUYLFHBBB([SORUDWRU\BBB6WUDWLJUDSKLF7HVWBBB1RQ&RQYHQWLRQDO ),(/'BBBBBBBBBBBBBBBBBBBBBBBBBBBB322/BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB &KHFN%R[IRU$SSURSULDWH/HWWHU3DUDJUDSKVWREH,QFOXGHGLQ7UDQVPLWWDO/HWWHU &+(&. 237,216 7(;7)25$33529$//(77(5 08/7, /$7(5$/ ,IODVWWZRGLJLWV LQ$3,QXPEHUDUH EHWZHHQ 7KH SHUPLW LV IRU D QHZ ZHOOERUH VHJPHQW RI H[LVWLQJ ZHOO 3HUPLW 1R BBBBBBBBBBBBB $3, 1R BBBBBBBBBBBBBBBBBBBBBBB 3URGXFWLRQVKRXOGFRQWLQXHWREHUHSRUWHGDVDIXQFWLRQRIWKHRULJLQDO $3,QXPEHUVWDWHGDERYH 3LORW+ROH ,QDFFRUGDQFH ZLWK $$& I DOO UHFRUGV GDWD DQG ORJV DFTXLUHG IRU WKH SLORW KROH PXVW EH FOHDUO\ GLIIHUHQWLDWHG LQ ERWK ZHOO QDPH BBBBBBBBBBBBBBBBBBBBBBB3+ DQG $3, QXPEHU BBBBBBBBBBBBBBBBBBBBBIURPUHFRUGVGDWDDQGORJVDFTXLUHGIRU ZHOOQDPHRQSHUPLW 6SDFLQJ ([FHSWLRQ 7KHSHUPLWLVDSSURYHGVXEMHFWWRIXOOFRPSOLDQFHZLWK$$& $SSURYDO WR SURGXFHLQMHFW LV FRQWLQJHQW XSRQ LVVXDQFH RI D FRQVHUYDWLRQ RUGHU DSSURYLQJ D VSDFLQJ H[FHSWLRQ BBBBBBBBBBBBBBBBBBBBBBBBBBBBBDV2SHUDWRUDVVXPHVWKHOLDELOLW\ RIDQ\SURWHVWWRWKHVSDFLQJH[FHSWLRQWKDWPD\RFFXU 'U\'LWFK6DPSOH $OOGU\GLWFKVDPSOHVHWVVXEPLWWHGWRWKH$2*&&PXVWEHLQQRJUHDWHU WKDQ VDPSOHLQWHUYDOVIURPEHORZWKHSHUPDIURVWRUIURPZKHUH VDPSOHVDUHILUVWFDXJKWDQG VDPSOHLQWHUYDOVWKURXJKWDUJHW]RQHV 1RQ &RQYHQWLRQDO :HOO 3OHDVHQRWHWKHIROORZLQJVSHFLDOFRQGLWLRQRIWKLVSHUPLW 3URGXFWLRQRUSURGXFWLRQWHVWLQJRIFRDOEHGPHWKDQHLVQRWDOORZHGIRU ZHOO XQWLODIWHU KDVGHVLJQHGDQGLPSOHPHQWHGDZDWHUZHOOWHVWLQJSURJUDPWRSURYLGH EDVHOLQH GDWD RQ ZDWHU TXDOLW\ DQG TXDQWLW\ BBBBBBBBBBBBBBBBBBBBBBBB PXVW FRQWDFW WKH $2*&& WR REWDLQ DGYDQFHDSSURYDORIVXFKZDWHUZHOOWHVWLQJSURJUDP :HOO/RJJLQJ 5HTXLUHPHQWV 5HJXODWLRQ$$&DDXWKRUL]HVWKH$2*&&WRVSHFLI\W\SHV RIZHOOORJVWREHUXQ,QDGGLWLRQWRWKHZHOOORJJLQJSURJUDPSURSRVHG E\BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBLQWKHDWWDFKHGDSSOLFDWLRQ WKHIROORZLQJZHOOORJVDUHDOVRUHTXLUHGIRUWKLVZHOO 3HU6WDWXWH$6G%DQG5HJXODWLRQ$$& FRPSRVLWHFXUYHVIRUZHOOORJVUXQPXVWEHVXEPLWWHGWRWKH$2*&& ZLWKLQGD\VDIWHUFRPSOHWLRQVXVSHQVLRQRUDEDQGRQPHQWRIWKLV ZHOO .XSDUXN5LYHU.XSDUXN5LYHU2LO .58%$ .XSDUXN5LYHU WELL PERMIT CHECKLISTCompanyConocoPhillips Alaska, Inc.Well Name:KUPARUK RIV UNIT 1B-14AInitial Class/TypeDEV / PENDGeoArea890Unit11160On/Off ShoreOnProgramDEVField & PoolWell bore segAnnular DisposalPTD#:2220210KUPARUK RIVER, KUPARUK RIV OIL - 490100NA1Permit fee attachedYesSurf Loc & Top Prod Int lie in ADL0025648; TD lies in ADL0025639.2Lease number appropriateYes3Unique well name and numberYesKuparuk River Oil Pool, governed by Conservation Order No. 432E4Well located in a defined poolYesAs planned, well conforms with spacing requirements.5Well located proper distance from drilling unit boundaryYes6Well located proper distance from other wellsYes7Sufficient acreage available in drilling unitYes8If deviated, is wellbore plat includedYes9Operator only affected partyYes10Operator has appropriate bond in forceYes11Permit can be issued without conservation orderYes12Permit can be issued without administrative approvalYes13Can permit be approved before 15-day waitNA14Well located within area and strata authorized by Injection Order # (put IO# in comments) (For NA15All wells within 1/4 mile area of review identified (For service well only)NA16Pre-produced injector: duration of pre-production less than 3 months (For service well only)NA17Nonconven. gas conforms to AS31.05.030(j.1.A),(j.2.A-D)NA18Conductor string providedNA19Surface casing protects all known USDWsNA20CMT vol adequate to circulate on conductor & surf csgNA21CMT vol adequate to tie-in long string to surf csgNoProductive interval will be completed with uncemented slotted liner22CMT will cover all known productive horizonsYes23Casing designs adequate for C, T, B & permafrostYesRig has steel tanks; all waste to approved disposal wells24Adequate tankage or reserve pitYesPTD 192-030, Sundry 322-08225If a re-drill, has a 10-403 for abandonment been approvedYesAnti-collision analysis complete; no major risk failures26Adequate wellbore separation proposedNA27If diverter required, does it meet regulationsYesMax reservoir pressure is 3103 psig(9.5 ppg EMW); will drill w/ 8.6 ppg EMW & maintain overbal w/ MPD28Drilling fluid program schematic & equip list adequateYes29BOPEs, do they meet regulationYesMPSP is 2606 psig; will test BOPs to 3500 psig30BOPE press rating appropriate; test to (put psig in comments)Yes31Choke manifold complies w/API RP-53 (May 84)Yes32Work will occur without operation shutdownYesH2S measures required33Is presence of H2S gas probableNA34Mechanical condition of wells within AOR verified (For service well only)NoH2S measures required. Wells on 1B-Pad are H2S-bearing.35Permit can be issued w/o hydrogen sulfide measuresYesExpected reservoir pressure is 9.2-9.5 ppg, with some potential of higher pressure due to gas36Data presented on potential overpressure zonesNAinjection within this area. Well will be drilled using 8.6 ppg mud, a coiled-tubing rig, and37Seismic analysis of shallow gas zonesNAmanaged pressure drilling technique to control formation pressures and stabilize shale sections by38Seabed condition survey (if off-shore)NAmaintaining a constant bottom-hole pressure of about 11.8 ppg EMW.39Contact name/phone for weekly progress reports [exploratory only]ApprSFDDate3/1/2022ApprVTLDate3/3/2022ApprSFDDate3/1/2022AdministrationEngineeringGeologyGeologic Commissioner:Date:Engineering Commissioner:DatePublic CommissionerDate-03JLC 3/3/2022