Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout2018-03-12_318-101STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS 20 AAC 25.280 MAR 12 2019 A®Gcc 1. Type of Request: Abandon 0 Plug Perforations LJ Fracture Stimulate Repair Well Li Operations shutdown Suspend ❑ Perforate 171 Other Stimulate ❑ Pull Tubing ❑ Change Approved Program Plug for Redrill ❑ Perforate New Pool ❑ Re-enter Susp Well ❑ Alter Casing ❑ Other: 2. Operator Name: 4. Current Well Class: 5. Permit to Drill Number: ConocOPhllll s Alaska Inc. Exploratory Q Development El Stratigraphic E]Service ❑ 217-170 3. Address: 6. API Number: P. O. Box 100360, Anchorage, Alaska 99510 50-103-20767-00 7. If perforating: 8. Well Name and Number: What Regulation or Conservation Order governs well spacing in this pool? N/A Will planned perforations require a spacing exception? Yes El No 2 Tinmiaq 8 9. Property Designation (Lease Number): 10. Field/Pool(s): EXPLORATORY it. PRESENT WELL CONDITION SUMMARY Total Depth MD (ft): Total Depth TVD (ft): Effective Depth MD: Effective Depth TVD: MPSP (psi): Plugs (MD): Junk (MD): Casing Length Size MD TVD Burst Collapse Perforation Depth MD (ft): Perforation Depth TVD (ft): Tubing Size: Tubing Grade: Tubing MD (ft): Packers and SSSV Type: Packers and SSSV MD (ft) and TVD (ft): 12. Attachments: Proposal Summary ❑ Wellbore schematic ❑ 13. Well Class after proposed work: Detailed Operations Program ❑ BOP Sketch ❑ Exploratory ❑� Stratigraphic ❑ Development ❑ Service ❑ 14. Estimated Date for 15. Well Status after proposed work: Commencing Operations: OIL ❑ WINJ E—] WDSPL ❑ Suspended GAS ❑ WAG ❑ GSTOR ❑ SPLUG 16. Verbal Approval: Date: Commission Representative: GINJ ❑ Op Shutdown ❑ Abandoned 17. 1 hereby certify that the foregoing is true and the procedure approved herein will not be deviated from without prior written approval. Authorized Name: Sandeep Peden Sandeep Pedam Contact Name: Authorized Title: Staff Cc mpleti2V Engineer Contact Email: Sandeep. Pedam@cop.com , Contact Phone: (907) 263-4724 Authorized Signature —�'� Date: tAG.! r 2 ON B COMMISSION USE ONLY Conditions of approval: Notify Commission so that a representative may witness Sundry Number: S113— I Q Plug Integrity E:J BOP Test ❑ Mechanical Integrity Test ❑ Location Clearance ❑ Other. Post Initial Injection MIT Req'd? Yes ❑ No ❑ Spacing Exception Required? Yes = No ❑ Subsequent Form Required: APPROVED BY Approved by: COMMISSIONER THE COMMISSION Date: Submit Form and Form 10-403 Rrvbed 4/2017 Approved application is valid for 12 months from the date of approval. A".Onrents in Duplin to ConocoPhillips Guy Schwartz Senior Petroleum Engineer Alaska Oil & Gas Conservation Commission 333 W 7th Ave #100 Anchorage, Alaska 99501 Dear Mr. Schwartz: Sandeep Pedam Staff Completions Engineer ConocoPhillips Company 700 G St Anchorage, AK 99501 Phone 907.263.4724 Under cover of this letter, ConocoPhillips Alaska, Inc., ("CPAI") is submitting an application for sundry approval to hydraulically fracture the Tinmiaq 7 exploration well (API # 103-20767-00-00) recently drilled on federal lands in the National Petroleum Reserve —Alaska ("NPR -A"). Some information in the application is confidential exploration well data and trade secret information that is not subject to disclosure because it is protected under AS 31.05.035(c), 20 AAC 25.537, AS 45.50.910-.940, 5 U.S.C. § 552(b)(4), (9), and other applicable law. To preserve confidentiality, CPAI is including a copy of the application that has confidential information redacted. Only this redacted copy, which is marked "Redacted — For Public Disclosure") may be posted on the AOGCC's public Internet website, as provided in 20 AAC 25.280(f). Along with the original application (containing confidential information) and a redacted copy, CPAI is submitting an unredacted copy, which is marked "Confidential", for the AOGCC's internal use only. Regards, Sandeep Pedam Staff Completion Engineer TO THE ALASKA OIL AND GAS CONSERVATION COMMISSION Before the Commissioners of the ) Alaska Oil and Gas Conservation ) Commission in the Matter of the ) AFFIDAVIT OF Garrett B. Haag Request of ConocoPhillips Alaska, Inc. for ) Hydraulic fracturing for the TiOmiaq 8 Well ) under the Provisions ) of 20AAC 25.280 ) STATE OF ALASKA ) §§ THIRD JUDICIAL DISTRICT ) Garrett B. Haag, being first duly sworn, upon oath, deposes and states as follows: 1. My name is Garrett B. Haag. I am over 19 years old and have personal knowledge of the matters set forth herein. 2. 1 am Staff Landman for the well operator, ConocoPhillips Alaska, Inc. ("CPAP') 3. Pursuant to 20 AAC 25.283 (1) CPAI prepared the attached Notice of Operations ("Notice'). 4. On February 7, 2018, CPAI sent a copy of the Notice by certified mail to the last known address of all other owners, landowners, surface owners, and operators of record within a one-half mile radius of the current proposed well trajectory. Subscribed and sworn to this 7t^ day of February 2018. Garrett B. Haag STATE OF ALASKA ) THIRD JUDICIAL DISTRICT ) This instrument was acknowledged before me this 71h day of February 2018, by Garrett B. Haag. & Notary Public, State of Alaska My Commission Expires: STATE OF ALASKA ��ry NOTARY PUBLIC -1 REBECCA SWENSEN My Qxnmiasicn Eaphes Aug. 27, 2020. ConocoPhillips P. O. BOX 100360 ANCHORAGE, ALASKA 99510-0360 Alaska Garrett B. Haag, Staff Landman Land Department, ATO 1480 Phone (907)265-6297 Fax (907)263-4966 Garrett.B.Haag©cop.com February 7, 2018 VIA CERTIFIED MAIL To: Operator and Owners (shown on Exhibit 2) Re: Notice of Operations pursuant to 20 AAC 25.283 (1) for Tigmiaq 8 BLM Serial No. AA -092673 Greater Mooses Tooth Unit, Alaska CPAI Contract No. 204278 CPAI Lease No. 341732 Dear Operator and Owners: ConocoPhillips Alaska, Inc. ("CPAI") as Operator and on behalf of the Greater Mooses Tooth Unit ("GMTU"), hereby notifies you that it intends to submit an Application for Sundry Approvals for stimulation by hydraulic fracturing pursuant to the provisions of 20 AAC 25.280 ("Application") for the Tirlmiaq 8 Well (the "Well"). The Application will be filed with the Alaska Oil and Gas Conservation Commission ("AOGCC") on or about February 25, 2018. This Notice is being provided pursuant to subsection of 20 AAC 25.283. The Well is planned to be drilled as a straight hole on lease AA -092673 as depicted on Exhibit 1 with planned surface and bottomhole locations as follows: Location FNL FWL Township Range Section Meridian Surface 257' 85' 9N 1W 17 Umiat Bottomhole 257' 85' 9N 1W 17 Umiat Exhibit 1 shows the location of the Well and the lands that are within a one-half mile radius of the current proposed trajectory of the Well, including the reservoir section ("Notification Area"). Exhibit 2 is a list of the names and addresses of all owners, landowners and operators of record of all properties within the Notification Area. Upon your request, CPAI will provide a complete copy of the Application. If you require any additional information, please contact the undersigned. Sincerely, Garrett B. Haag g, Staff Landman Attachments: Exhibits 1 & 2 VOILTIZ—HrIg Exhibit 1 G In Tinmiaq 8 Landowners 0 Tinmiaq 8 Q 1/2 Mile Radius QOil & Gas Unit AA081787 Q Lease Boundary CPAI AEP /r Conoco*Phillips 17 Page 1 of 1 Exhibit 2 List of the names and addresses of all owners, landowners and operators of all properties within the Notification Area. Operator and Record Title Owner of Oil and Gas Leases: ConocoPhillips Alaska, Inc. 700 G Street, Suite ATO 2176 (Zip 9950 1) P.O. Box 100360 Anchorage, AK 99510-0360 Attention: Lorna Richmond, Alaska Exploration Manager Record Title Owner of Oil and Gas Leases: Anadarko E&P Onshore LLC P.O. Box 1330 Houston, TX 77251-1330 Attention: Frank Meyer, Land Manager — Alaska Landowners: United States Department of Interior Bureau of Land Management Alaska State Office 222 West 7th Avenue, #13 Anchorage, Alaska 99513 Attn: Branch Chief, Energy and Minerals Surface Owner: United States Department of Interior Bureau of Land Management Alaska State Office 222 West 7th Avenue, #13 Anchorage, Alaska 99513 Attn: Branch Chief, Energy and Minerals Via Certified Mail No. 7017 0530 0000 3354 9731 Via Certified Mail No. 7016 1370 0000 0848 7134 Via Certified Mail No. 7016 1370 0000 0848 7134 Page 1 of 1 REDACTED — FOR PUBLIC DISCLOSURE Section 1 - Affidavit 10 AAC 25.283 (a)(1) Exhibit 1 is an affidavit stating that the owners, landowners, surface owners and operators within one- half mile radius of the current or proposed wellbore trajectory have been provided notice of operations in compliance with 20 AAC 25.283(a)(1) Affidavit REDACTED - FOR PUBLIC DISCLOSURE Section 2 - Plat 20 AAC 25.283 (a)(2) Plat 1: Wells within 0.5 mile Exhibit 1 T9N R1W 1 R rA7AM72A7ACPA _. AE G eater M ores oth a n Tlnmiaq 8 Landowners Tinnniaq 8 Q 112 Mile Radius 1:3Oil& Gas Unit Lease Boundary AA081787 CPAI w� AEP ConocoPhillips © Fee[ 7SO 1,5W , I?0 J. csewrigk Table 1: Wells within 0.5 mile REDACTED — FOR PUBLIC DISCLOSURE Section 3 - Freshwater Aquifers 20 AAC 25.283(a)(3) There are no freshwater aquifers or underground sources of drinking water within one-half mile radius of the current or proposed wellbore trajectory. REDACTED — FOR PUBLIC DISCLOSURE Section 4 - Plan for Baseline Water Sampling for Water Wells 20 AAC 2S.283(a)(4) There are no water wells located within one-half mile of the current or proposed wellbore trajectory and fracturing interval. REDACTED - FOR PUBLIC DISCLOSURE Section 5 - Detailed Cementing and casing information 20 AAC 25.283(a)(5) REDACTED - FOR PUBLIC DISCLOSURE Section 6 - Assessment of each casing and cementing operation to be performed to construct or repair the well 20 AAC 25.283(a)(6) REDACTED - FOR PUBLIC DISCLOSURE Section 7 - Pressure test information and plans to pressure test casing and tubings installed in the well 20 AAC 25.283 (a)(7) REDACTED - FOR PUBLIC DISCLOSURE Section 8 - Pressure ratings and schematics for the Wellbore, Wellhead, BOPE and Treating head 20 AAC 25.283(a)(8) REDACTED — FOR PUBLIC DISCLOSURE Stimulation Surface Rig -Up Bleed/Tattle Tale Tack e XLd. � 0 Pop-off Te ai> Hma ca Frac Pump Frac Pump • Min. press. Rating on all surface treating lines 10,000 psi • Main treating line PRV set to 95% of max. treating pressure • IA parallel PRV set to 3600 psi • Frac pump trip pressure setting staggered and set below main treating line PRV • Tree saver used on all fracs rated for 15,000 psi Pop-off Tack Pump Truck Frac Pp Frac P=p REDACTED — FOR PUBLIC DISCLOSURE Tree Saver With Wellhead j'Vj OIL STATES Energy Services (Canada) Inc. QUOTE#: Maximum Allowable Pumping Rates DATE: PROPOSAL - SIZE CSG ID 2.250 1 .. 3.750 RATE Wimin 1 10 m'/min 3112" Big Bore L750 — 2.750 6 m'"'112 718" & 3112" 1.438 2. 60 4 m'/min 2 318" 1.000 1 1.900 1 2 m'/min 31116 & 41116 with tapered mandrel 2.750 4.000 1b m'lmin 41/16 X Toot Mandrel 3.610 4.750 24 m'lmin OPEN POSITION I'�� NY..W WMIIG wnuwr Y ��• IS] IItW ACCP ,IW II. VNA. CLOSED POSITION �W.4V'll YAIV'Ip� � i @ IIIE it- 41VMNl {/ IIilNV Ali tw.W w .osescanada.corn Pressure rating: 15,000psi Wellhead REDACTED- FOR PUBLIC DISCLOSURE fMCTecnnoiogies a lm c sues GENERATION 5 WELLHEAD 9 Ro S. REDACTED - FOR PUBLIC DISCLOSURE 4 elJ6 5000 IRU W 4 1r16-5000 WlK un 0 REDACTED- FOR PUBLIC DISCLOSURE Wellbore schematic REDACTED - FOR PUBLIC DISCLOSURE Section 9 - Data for Fracturing zone and confining zones 20 AAC REDACTED -FOR PUBLIC DISCLOSURE Section 10 - Location, Orientation and a Report on Mechanical Condition of Each Well that may Transect Confining Zone 20 AAC 25.283(a)(10) REDACTED - FOR PUBLIC DISCLOSURE Section 11 - Location of, Orientation of and Geological Data for Faults and Fractures that may Transect the Confining Zones 20 AAC 25.283(a)(11) REDACTED - FOR PUBLIC DISCLOSURE REDACTED - FOR PUBLIC DISCLOSURE Section 12 - Proposed Hydraulic Fracturing Program 20 AAC REDACTED — FOR PUBLIC DISCLOSURE Section 13 - Post -Fracture Wellbore Cleanup and Fluid Recovery Plan 20 AAC 25.283(a)(13) Little Red Services with be the Well Testing company for Tinmiaq 8. The base case for the flow test consists of four periods: Period Duration (hrs) 1 Post frac high draw dawn clean up flow 72 2 Shut-in pressure build up period 72 3 Main flow - low drawdown period 240 4 Main shut-in period 240 The "post -frac high draw down clean up flow' period is intended to produce the frac fluid back as quickly as possible until the well is producing at less than 10% water cut. We will likely need N2 to kick the well off and will have it on location to sustain flow if needed. The "shut-in pressure build up period" will be equal to the time of the first flow. The "main flow period" will impose minimal drawdown while maintaining stable flow for the duration. We will collect downhole samples, pressurized gas and oil samples, and stock tank oil. We will flare the produced gas through Little Red Services flare stack with a continuous pilot. During the "main shut-in period" we will monitorthe pressure buildup. There will be a tank farm on location with 4,000 BBL capacity. Fluid will be trucked to either Alpine or Kuparuk (depending on what fluid) with appropriate North Slope Manifests and volumes for each transport. We will take tank straps before and after transport loading to calculate total fluid leaving location. During the testing operations, we will be taking 30 min tank straps to confirm volumes. Shakeouts will be taken on 30 min intervals for water cut and BS&W. A Micromotion and Phase Dynamics will also be installed for continuous flow rate monitoring. Once the flow test is complete we will suspend the well with permanent downhole gauge for pressure monitoring. Proposed Well Testing Layout 40 PR A IN A GF (,YPN LLE I', FEET REDACTED - FOR PUBLIC DISCLOSURE TINMIAQ#8 REDACTED - FOR PUBLIC DISCLOSURE REDACTED — FOR PUBLIC DISCLOSURE Little Red Services MID 3a D Z $ O • - rom(��ly0rDAlmlim y �m3 m `G a yy C TJaJ� - Z-ZiW'mU AN�u�bF 71 m 0_ - �� m m m x x xx x x x o ma ° R u9 rva y a =� : •` z + FII $ T n r Dn m 2 z O D m m 0 nx= aom y d i n CD3 mss - o yNc' vmm n c z9xa 6 n� mcm v oma ? - m 3 Wff - poN 3 = o of ���$.Ni; m mw mw4 x rU ° '3 0 m.m m 71N v '09 'oA oNm m a w w _ n w rnAS�'gP" a 6 ''$P"' �w �c wm � fn a < a 3 n 3 so �q3 u� aim <^ m m So r m 3 3 Na nmC Er a3 • T m p 9 • m � a m O am a w o� 3 - u w m, .z=� m -11 2 m 0 Dzi D Z D D �w-� D D D m in O NxO�=y NN_ N _ v m' n O _ - 3 7 3 3 W �0 7 aA - Qa _ za m m � � E d m � n nn 3xo 3xo m� am aq m o® _ 9 9oA Z a