Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAbout2018-11-01_318-486RECEIVE[
STATE OF ALASKA
NOV 020�$ ALASKA OIL AND GAS CONSERVATION COMMISSION
APPLICATION FOR SUNDRY APPROVALS
r 20 AAC 25.280
Rf-�,C.T ED
1. Type of Reque%d U Wiel6n LJ Plug Perforations ❑ Fracture Stimulate ° Repair Well LJ Operations shutdown
Suspend ❑ Perforate ❑� Other Stimulate ❑ Pull Tubing ❑ Change Approved Program ❑
Plug for Redrill ❑ Perforate New Pool ❑ Re-enter Susp Well ❑ Alter Casing ❑ Other: ❑
2. Operator Name:
4. Current Well Class:
5. Permit to Drill Number:
ConocoPhilli s Alaska Inc.
Exploratory ❑ Development ❑
Stratigraphic ❑ Service ❑
217-171
3. Address:
6. API Number:
P. O. Box 100360, Anchorage, Alaska 99510
50-103-20768-00-00
7. If perforating:
8. Well Name and Number:
What Regulation or Conservation Order governs well spacing in this po N/A
Tinmiaq 9
Will planned perforations require a spacing exception? Yes ❑ No i]
9. Property Designation (Lease Number):
10. Field/Pool(s):
AA081747
I Exploratory
11. PRESENT WELL CONDITION SUMMARY
Total Depth MD (ft): Total Depth TVD (ft)
Effective Depth MD: Effective Depth TVD MPSP (psi): Plugs (MD): Junk (MD):
Casing Length
Size MD TVD Burst Collapse
Structural
Conductor
Surface
Intermediate
Production
Liner
Perforation Depth MD (ft):
Perforation Depth TVD (ft):
Tubing Size:
Tubing Grade:
Tubing MD (ft):
Packers and SSSV Type:
Packers and SSSV MD (ft) and TVD (ft):
12. Attachments: Proposal Summar Wellbore schematic
13. Well Class after proposed work:
Detailed Operations Program ❑ BOP Sketch ❑
Exploratory F] Stratigraphic ❑ Development ❑ Service ❑
14. Estimated Date for
15. Well Status after proposed work:
Commencing Operations:
OIL ❑ WINJ ❑ WDSPL ❑ Suspended ❑'
GAS ❑ WAG ❑ GSTOR ❑ SPLUG ❑
16. Verbal Approval: Date:
Commission Representative:
GINJ ❑ Op Shutdown ❑ Abandoned ❑
17. 1 hereby certify that the foregoing is true and the procedure approved
herein will not be deviated from without prior written approval.
Authorized Name: Sandeep Pedant Contact Name: Sandeep Pedam
Authorized Title: StV Completions Engineer Contact Email: Sandeep.Pedam@conocophillips.com
Contact Phone: ;907) 263-4724
Authorized b 20 [ 9
Signature: Date:
COMMISSION USE ONLY
Conditions of approval: Notify Commission so that a representative may witness Sundry Number:
Plug Integrity ❑ BOP Test❑ Mechanical Integrity Tes[] Location Clearance ❑
Other:
Post Initial Injection MIT Req' Yes ❑ No ❑
Spacing Exception Required, Yes ❑ No ❑ Subsequent Form Required:
APPROVED BY
Approved by: COMMISSIONER THE COMMISSION Date:
>uomn Corm ano
Form 10403 Revised 4/2017 Approved application is valid for 12 months from the date of approval. Attachments in Duplicate
From,
Sandeep Pedam
ConocoPhillips Alaska
700 G St, Anchorage, AK, 99502
To,
Guy Schwartz
Alaska Oil & Gas Conservation Commission
333 W 7t^ Ave #100, Anchorage, AK 99501
Pursuant to regulation 20 AAC 25.283, ConocoPhillips would like to submit a request to hydraulically
stimulate Tinmiaq 9. Stimulation will occur in accordance with regulations of the state and
ConocoPhillips will ensure all Health, Safety, and Environmental regulations are adhered to. Tinmiaq 9 is
an exploration well, and ConocoPhillips would like to inform AOGCC that information contained herein is
deemed confidential. Therefore, we request all the information in the sundry to be redacted.
1
Regards,
Sandeep Pedak I o/ 1-4f 2'A
Staff Completion Enyneer
TO THE ALASKA OIL AND GAS CONSERVATION COMMISSION
Before the Commissioners of the )
Alaska Oil and Gas Conservation )
Commission in the Matter of the ) AFFIDAVIT OF Garrett B. Haag
Request of ConocoPhillips Alaska, Inc. for )
Hydraulic fracturing for the Tiqmiaq 9 Well )
under the Provisions )
of 20 AAC 25.280 )
STATE OF ALASKA )
§§
THIRD JUDICIAL DISTRICT )
Garrett B. Haag, being first duly sworn, upon oath, deposes and states as follows:
1. My name is Garrett B. Haag. I am over 19 years old and have personal knowledge of the matters set
forth herein.
2. 1 am Staff Landman for the well operator, ConocoPhillips Alaska, Inc. ("CPA]")
3. Pursuant to 20 AAC 25.283 (1) CPA[ prepared the attached Notice of Operations ("Notice").
4. On October 18, 2018, CPAI sent a copy of the Notice by certified mail to the last known address of all
other owners, landowners, surface owners, and operators of record within a one-half mile radius of the current proposed
well trajectory.
Subscribed and sworn to this 181" day of October 2018.
STATE OF ALASKA Garrett B. H6ag
§§
THIRD JUDICIAL DISTRICT )
This instrument was acknowledged before me this 181h day of October 2018, by Garrett B. Haag.
Af`J)�C 2r 1 1i'4—;Pr ,
Notary Public, State of Alaska
STA x
NOTARY PUBLIC
RESECCASWENSEN
My emission Expl" Aug. 27, 2020.
ConocoPhillips
P. O. BOX 100360
ANCHORAGE, ALASKA 99510-0360
Alaska Garrett B. Hang, Staff Landman
Land Deportment, ATO 1480
Phone (907) 265-6297
Fax (907)263-4966
Ga rrett. B.Haag@cop.eo m
October 18, 2018 VIA CERTIFIED MAIL
To: Operator and Owners (shown on Exhibit 2)
Re: Notice of Operations pursuant to 20 AAC 25.283 (1) for Tirjmiaq 9
BLM Serial No. AA -081747, AA -087891
Bear Tooth Unit, Alaska
CPAI Contract No. 206223
CPA] Lease No. 953090
Dear Operator and Owners:
ConocoPhillips Alaska, Inc. ("CPAI") as Operator and on behalf of the Bear Tooth Unit, hereby notifies
you that it intends to submit an Application for Sundry Approvals for stimulation by hydraulic fracturing
pursuant to the provisions of 20 AAC 25.280 ("Application") for the Tipmiaq 9 Well (the "Well"). The
Application will be filed with the Alaska Oil and Gas Conservation Commission on or about October 19,
2018. This Notice is being provided pursuant to subsection of 20 AAC 25.283.
The Well has been drilled as a straight hole on lease AA -081747 as depicted on Exhibit 1 and has the
locations as follows:
Location
FSL
FEL
Township
Range
Section
Meridian
Surface
1,109'
393'
IIN
1W
18
Umiat
Bottomhole
1,100'
407'
11N
1W
18
Umiat
Exhibit 1 shows the location of the Well and the lands that are within a one-half mile radius of the Well,
including the reservoir section ("Notification Area"). Exhibit 2 is a list of the names and addresses of all
owners, landowners and operators of record of all properties within the Notification Area.
Upon your request, CPAI will provide a complete copy of the Application. If you require any additional
information, please contact the undersigned.
Sincerely,
Aj � �-7
Garrett B. Haag
Staff Landman
Attachments: Exhibits 1 & 2
Notice of Operations pursuant to 20 AAC 25.283 (1) for Tigmiaq 9
October 18, 2018
Exhibit 1
Page I of 1
6
5
4
AAM747
12
N
t,
9
0
T11NR1W
a
N
d
QO¢
13
G
17
G
� NMIAQ 9
TJIN 2W
Bear Toot
24
19
20
11
Q$
6
a
¢0
AA887891
25
30
29
28
• Drilled Well
1/2 mile buffer
Unit Boundaries
CPAI Lease
36
31
Sections
AA094166
32__.
ConocoPhillips
0 02 04 U 08 1
Mfles
Page I of 1
Notice of Operations pursuant to 20 AAC 25.283 (1) for Thjrniaq 9
October 18, 2018
Exhibit 2
List of the names and addresses of all owners, landowners and operators of all properties within the
Notification Area.
Operator and Record Title Owner of Oil and Gas Leases:
ConocoPhillips Alaska, Inc.
700 G Street, Suite ATO 2176 (Zip 99501)
P.O. Box 100360
Anchorage, AIC 99510-0360
Attention: Lorna Richmond, Alaska Exploration Manager
Landowner:
United States Department of Interior
Bureau of Land Management
Alaska State Office
222 West 7th Avenue, #13
Anchorage, Alaska 99513
Attn: Branch Chief, Energy and Minerals
Surface Owner:
United States Department of Interior
Bureau of Land Management
Alaska State Office
222 West 7th Avenue, # 13
Anchorage, Alaska 99513
Attn: Branch Chief, Energy and Minerals
Via Certified Mail No. 7017 0530 0000 3354 9793
Via Certified Mail No. 7017 0530 0000 3354 9793
Page 1 of 1
Section 1- Affidavit 10 AAC 25.283 (a)(1)
Exhibit 1 is an affidavit stating that the owners, landowners, surface owners and operators within one-
half mile radius of the current or proposed wellbore trajectory have been provided notice of operations
in compliance with 20 AAC 25.283(a)(1)
Affidavit
Section 2 - Plat 20 AAC 25.283 (a)(2)
Plat 1: Wells within 0.5 mile
7
a
0
Table 1: Wells within 0.5 mile
5
AA081747
a
Tl1 N R9W
to
r,
TINMIAQ 9
Beat Tooth
ie
AA887891
23
31 32
4
9
23
Drilled Well
OUnit Boundaries
CPAI Lease
Sections
11
ContxoPhilfips NoaTM
C 9I! es Cd 90 1
Mk:
a
23
Drilled Well
OUnit Boundaries
CPAI Lease
Sections
11
ContxoPhilfips NoaTM
C 9I! es Cd 90 1
Mk:
Section 3 -Freshwater Aquifers 20 AAC 25.283(a)(3)
There are no freshwater aquifers or underground sources of drinking water within one-half mile radius
of the current or proposed wellbore trajectory.
Section 4 - Plan for Baseline Water Sampling for Water Wells 20
AAC 25.283(a)(4)
There are no water wells located within one-half mile of the current or proposed wellbore trajectory and
fracturing interval.
A water well sampling plan is not applicable.
Section 5 - Detailed Cementing and casing information 20 AAC
25.283(a)(5)
All casing is cemented in accordance with 20 AAC 25.030(b) and tested in accordance with 20 AAC
25.030 (e) when completed.
This information is confidential and is therefore redacted
Section 6 - Assessment of each casing and cementing operation to
be performed to construct or repair the well 20 AAC 25.283(a)(6)
This information is confidential and is therefore redacted
Section 7 - Pressure test information and plans to pressure test
casing and tubings installed in the well 20 AAC 25.283 (a)(7)
20 AAC 25.283 Hydraulic fracturing
This information is confidential and is therefore redacted
Section 8 - Pressure ratings and schematics for the Wellbore,
Wellhead, BOPE and Treating head 20 AAC 25.283(a)(8)
20 AAC 25.283. Hydraulic fracturing
(a) Before hydraulic fracturing, the operator must submit an Application for Sundry Approvals (Form 10-
403) under 20 AAC 25.280. Unless modified or altered by pool rules established under 20 AAC 25.520, the
application must include
(8) accurate pressure ratings and schematics for the wellbore, wellhead, BOPE, and treating head;
This information is confidential and is therefore redacted
Stimulation Surface Rig -Up
z
Bleed / TaNe
Tale Tern
I
Heml dwnd
E
O
Pop -Off Talk
i
r
U
• Min. press. Rating on all surface treating lines
10,000 psi
• Main treating line PRV set to 95% of max.
treating pressure
• IA parallel PRV set to 3600 psi
• Frac pump trip pressure setting staggered and
set below main treating line PRV
• Tree saver used on all fracs rated for 15,000 psi
Pop -Off Te k
Pump Truck
Tree Saver With Wellhead
`OIL STATES
Energy Services (Canada) Inc.
QUOTE#:
Maximum Allowable Pumping Rates
DATE:
PROPOSAL:
SIZE
CSG
•
2.280
••
3350
RATE 111il,
10 rn In
31(2" Big Bore
1.780 —
A 2.750
6 m'Jmin
2 718" & 3112"
1.438
2.360
4 m'Imin
2 318"
1.000
1.900
2 mYrnin
31/16 & 41/16 with tapered mandrel
2.750
4.000
—16 m'/min
41116 X Tool Mandrel
3.610
4.750
24 m'lmin
OPEN Posmax CseS•e PosnsoN
f^.x., nl vw.,nvi IsvnNara.)w
r
)s r f ri
-��.. •�nroax* ir� A'
' tl141t0
iµyl)IM YHN
1 • 1
11 11 I1
L -,rad
IYMlI1M.�n.
M11Vb.ry -
rtA I,1LL��41. I
wwN.osescanada.com
Pressure rating: 15,000psi
Wellhead
f MCToa,ndagoes
11 Wll[ . rains
11 0 11! 4
"M.S= PW IN G!
L lHi{GM Y-ifni
11+Y.FA �G�4Y
GENERATION 5 WELLHEAD
111Fsw, Ko W 4.
tlM..lu.,ft:IH'.
it. tX. .Si
oxer tK.nn
7
Section 9 - Data for Fracturing zone and confining zones 20 AAC
25.283(a)(9)
This information is confidential and is therefore redacted
Section 10 - Location, Orientation and a Report on Mechanical
Condition of Each Well that may Transect Confining Zone 20 AAC
25.283(a)(10)
There are no wells within on -half mile radius of the proposed wellbore trajectory
Section 11 - Location of, Orientation of and Geological Data for
Faults and Fractures that may Transect the Confining Zones 20 AAC
25.283(a)(11)
This information is confidential and is therefore redacted
Section 12 - Proposed Hydraulic Fracturing Program 20 AAC
25.283(a)(12)
This information is confidential and is therefore redacted
Section 13 - Post -Fracture Wellbore Cleanup and Fluid
Recovery Plan 20 AAC 25.283 (a) (13)
Little Red Services with be the Well Testing company for Tinmiaq 9. The base case for the flow test
consists of four periods:
The "post -frac high draw down clean up flow" period is intended to produce the frac fluid back as
quickly as possible until the well is producing at less than 10% water cut. We will likely need N2 to kick
the well off and will have it on location to sustain flow if needed. The "shut-in pressure build up period"
will be equal to the time of the first flow. The "main flow period" will impose minimal drawdown while
maintaining stable flow for the duration. We will collect pressurized gas and oil samples and stock tank
oil. We will flare the produced gas through testing vendor's flare stack with a continuous pilot. During
the "main shut-in period" we will monitor the pressure buildup.
There will be a tank farm on location with -7,400 BBL capacity. Fluid will be trucked to either Alpine or
Kuparuk (depending on what fluid) with appropriate North Slope Manifests and volumes for each
transport. We will take tank straps before and after transport loading to calculate total fluid leaving
location. During the testing operations, we will be taking 30 min tank straps to confirm volumes.
Shakeouts will be taken on 30 min intervals for water cut and BS&W. A Micromotion and Phase
Dynamics/turbine meter will also be installed for continuous flow rate monitoring.
Once the flow test is complete we will suspend the well with permanent downhole gauge for pressure
monitoring.
Period
Duration (Hrs)
1
Post Frac High Drawdown Clean Up Flow
36
2
Shut In Pressure Build Up Period
36
3
Main Flow Low Drawdown Perios
168
4
Main Shut In Period
350+
The "post -frac high draw down clean up flow" period is intended to produce the frac fluid back as
quickly as possible until the well is producing at less than 10% water cut. We will likely need N2 to kick
the well off and will have it on location to sustain flow if needed. The "shut-in pressure build up period"
will be equal to the time of the first flow. The "main flow period" will impose minimal drawdown while
maintaining stable flow for the duration. We will collect pressurized gas and oil samples and stock tank
oil. We will flare the produced gas through testing vendor's flare stack with a continuous pilot. During
the "main shut-in period" we will monitor the pressure buildup.
There will be a tank farm on location with -7,400 BBL capacity. Fluid will be trucked to either Alpine or
Kuparuk (depending on what fluid) with appropriate North Slope Manifests and volumes for each
transport. We will take tank straps before and after transport loading to calculate total fluid leaving
location. During the testing operations, we will be taking 30 min tank straps to confirm volumes.
Shakeouts will be taken on 30 min intervals for water cut and BS&W. A Micromotion and Phase
Dynamics/turbine meter will also be installed for continuous flow rate monitoring.
Once the flow test is complete we will suspend the well with permanent downhole gauge for pressure
monitoring.
Sample Well Testing Layout
E -ILI
:9i'. [.j
0
I
Sample Well Testing MID
'r:=:ti..
!)
k
f<•
/{
�
{{§
-
Rif
_ -
\)
� ���
\
� _
•�)\/.!
-_
/!
\Qb/§!
�f
G