Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
HOME
EVENTS
DATA
Data List
Drilling
Production
Orders
Data Miner
Document Search
REPORTS
Reports and Charts
Pool Statistics
FORMS
LINKS
Links
Test Notification
Data Requests
Regulations
Industry Guidance Bulletins
How to Apply
ABOUT US
History
Staff
HELP
Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
223-019
From:Guhl, Meredith D (OGC) To:Joseph Lastufka Subject:Milne Point PTDs 223-019 and 223-021 Date:Thursday, April 3, 2025 9:45:00 AM Hello Joe, The following Permits to Drill, issued to Hilcorp Alaska, have expired under Regulation 20 AAC 25.005 (g). The PTDs will be marked expired in the AOGCC database. MPU L-12L1, PTD 223-019, Issued 29 Mar 2023 MPU B-21A, PTD 223-021, Issued 28 Mar 2023 Please let me know if you have any questions or concerns. Thank you, Meredith Meredith Guhl (she/her) Petroleum Geology Assistant Alaska Oil and Gas Conservation Commission 333 W. 7th Ave, Anchorage, AK 99501 meredith.guhl@alaska.gov Direct: (907) 793-1235 CONFIDENTIALITY NOTICE: This e-mail message, including any attachments, contains information from the Alaska Oil and Gas Conservation Commission (AOGCC), State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged information. The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an unintended recipient of this e-mail, please delete it, without first saving or forwarding it, and, so that the AOGCC is aware of the mistake in sending it to you, contact Meredith Guhl at 907-793-1235 or meredith.guhl@alaska.gov. THE STATE °fALASKA GOVERNOR MIKE DUNLEAVY Monty M. Myers Drilling Manager Hilcorp Alaska, LLC 3800 Centerpoint Dr., Suite 1400 Anchorage, AK, 99503 Alaska Oil and Gas Conservation Commission 333 West Seventh Avenue Anchorage, Alaska 99501-3572 Main: 907.279.1433 Fax: 907.276.7542 www.aogcc.alaska.gov Re: Milne Point, Kuparuk River Oil, MPU L -12L 1 Hilcorp Alaska, LLC Permit to Drill Number: 223-019 Surface Location: 3172' FSL, 5028' FEL, Sec. 08, T13N, R10E, UM, AK Bottomhole Location: 1574' FSL, 1775' FWL, Sec. 08, T13N, R10E, UM, AK Dear Mr. Myers: Enclosed is the approved application for the permit to drill the above referenced well. Per Statute AS 31.05.030(d)(2)(B) and Regulation 20 AAC 25.071, composite curves for all well logs run must be submitted to the AOGCC within 90 days after completion, suspension, or abandonment of this well, or within 90 days of acquisition of the data, whichever occurs first. This permit to drill does not exempt you from obtaining additional permits or an approval required by law from other governmental agencies and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the AOGCC reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the AOGCC specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or an AOGCC order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. Sincerely, Digitally signed by Brett Brett W. W. Huber, Sr. HuberSr. Date: 2023.03.29 l 08:3806 -08'00' Brett W. Huber, Sr. Chair, Commissioner DATED this 29 day of March 2023. STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION PERMIT TO DRILL 20 AAC 25 005 RECEIVED avaam."m. eww.<a:Ie..,,,w w. ana 1 a. Type of Work: 1b.' b.Proposed Well Class: Exploratory - Gas ❑ Service - WAG ❑ Service - Disp ❑ ' 1o. Specify dwell is proposed for: Drill 13 Lateral ® StretigraphiC Test ❑ Development - Oil 0 Service - Winj ❑ Single Zone 0 Coalbed Gas ❑ Gas Hydrates [3 Reddll ❑ Reentry ❑ Exploratory - Oil ❑ Development -Gas ❑ Service -Supply ❑ Multiple Zone 13 Geothermal ❑ Shale Gas ❑ 2. Operator Name: 5. Bond Blanket H Single Well ❑ ' 11 - Well Name and Number: Hiloorp Alaska, LLC Bond No. 22224484 MPU L -12L1 3. Address: 6. Proposed Depth: 12. Field/Pool(s): 3800 Centerpoint Dr, Suite 1400, Anchorage, AK 99503 MD: 11854' TVD: 7200' MILNE POINT FIELD KUPARUK RIVER OIL POOL 4a. Location of Well (Governmental Section): ' 7. Property Designation (Lease Number): Surface: 3172' FSL, 5028' FEL, Sec. 08, TI 3N, R1 OE, UM, AK ADL 025509 Top of Productive Horizon: 8. DNR Approve Number. ' 13. Approximate spud date: 93' FSL, 1306' FEL, See. 08, T1 3N. RI OE, UM, AK 88-002 May 10, 2023 9. Acres in Property: 2533 14. Distance to Nearest Property: Total Depth: 1574' FSL, 1775' FWL, Seo. 08, T13N, R10E, UM, AK 14600' 4b. Location of Well (State Base Plane Coordinates- NAD 27): ' 10. KB Elevation above MSL: 51.0' feet 15. Distance to Nearest Well Surface: x-544854 y- 6031361 Zone - 4 GL Elevation above MSL: 15.4' feet Ope�to Same Pool: 0OAA0OC 16. Deviated wells: Kickoff Depth: 8755' feet 17. Maximum Anticipated Pressures in psig (see 20 25.035) Maximum Hole Angle: 99 degrees Downhole: 3131 Surface: 2414 18. Casing Program: Specifications Top - Setting Depth -Bottom Cement QuanC , c.f. or sacks Hole Casing Weight Grade Coupling Length MD TVD MD TVD in u rng stage ata 4.114" 3-112"x3-114" 9.3#!8.6# L-80 STLfTCII 3224' 8630' 6849' 11854' Uncemented Solid / Slatted Liner R2.7/8" /6.5# ISTL 19. PRESENT WELL CONDITION SUMMARY (To be completed for Redrill and Re -Entry Operations) Total Depth MD (ft): Total Depth TVD (ft): Plugs (measured): 1 Effect Depth MD (ft): Effect. Depth TVD (ft): Junk (measured): 9335 7394 None 9214 7299 1 None Casing Length Size Cement Volume MD TVD Conductor/Structural 80 13-3/8" 250 sx Permafrost C 30-110 30-110 Surface 2554 9.5/8" 990 sx Arctic Set IV, 235 sx Class G 30-2584 30-2411 Intermediate Production 9294 7" Sig 1: 385 sx Class G. Sig 2: 195 sx Class G 28-9322 28-7384 Liner Perforation Depth MD (0): 8751 - 9050 Perforation Depth TVD (ft): 6941 - 7171 Hydraulic Fracture planned? Yes ❑ No 0 20. Attachments Property Plat ❑ BOP Sketch ® Drilling Program ® Time v. Depth Plot ❑ Shallow Hazard Analysis ❑ Diverter Sketch ❑ Seabed Report ❑ Drillino Fluid Program ® 20 AAC 25.050 requirementsO 21. 1 hereby certify that the foregoing is true and the procedure approved herein will not be deviated from without prior written approval. Contact Name: Sean McLaughlin Authorized Name: Monty Myers Monty M Email: sean.mdaughlin@hiloorp.com s.an..naonW. Authorized Title: Drilling Managervers " ffi. KKmw.®��"=^ Contact Phone: 907-223-6784 a`m: zaxam�'m'oTu+em Authorized Signature: Date: 3.8.2 0 2 3 Commission Use Only Permit to Drill Number: 223-019 API Number: 50.029-22334.60.00 Permit Approval Date: See cover letter for other requirements: Conditions of approval: If box is checked, well may not be used to explore for, test, or produce coalbed methane, gas hydrates, or gas contained in shales: Other: ROPE test to 3500 psi. Samples req'd: Yes ❑ No ® Mud log req'd: Yes ❑ No 12 H2S measures Yes ® No ❑ Directional svy req'd: Yes 10 No ❑ Spacing exception req'd: Yes ❑ No 12 Indination-only svy req'd: Yes ❑ No 50 Post Initial injection MIT req'd: Yes ❑ No ❑ DlRally signed by Brettw. Huber, sr. APPROVED BY Approved by: Brett W. Huber, Sr. Date:2023.03.2908r1,.05 08'uu' COMMISSIONER 7THE COMMISSION Date: 3/29/2023 Comm. JLC 3/28/2023 CommGCW 03/28!23 Sr Pet EngMGR21 MAR2023 Sr Pel Geo MDG 3/10/2023 Sr Res Eng Form 10-401 Revised 3/2021 This permit is valid for 24 months from the date of approval (20 AAC 26.008(g)) To: Alaska Oil & Gas Conservation Commission From: Sean McLaughlin CTD Engineer Date: March 7, 2023 H ileo p Re: MPL-12L1 Permit to Drill Request Approval is requested for a permit to drill a CTD lateral from well MPL-12 with the Nabors CDR2 Coiled Tubing Drilling rig on or around May 2023. Proposed plan for MPL-12L3: A RWO will be conducted independently of the drilling operation to install a 4-1/2" completion. The whipstock will be set pre -rig in the 7" casing. The CDR2 rig will move in, test BOPE and kill the well. The well will kick off in the Kuparuk, build through the C and B intervals to land in the A sands. A -3100' coil tubing drilling lateral will be drilled in the A sands. The lateral will be completed with a 3-1/2" x 3-1/4" x 2-7/8" LED slotted liner. The following describes the work planned. A wellbore schematic of the current well and proposed lateral is attached for reference. Pre -Rig Work (scheduled to begin April 2023) 1. Tubing swap (conducted under separate sundry) 2. Set 7" Whipstock 3. Pre -CTD Tree work. RigWork (scheduled to begin May 2023) 1. MIRU and test BOPE 250 psi low and 3500 psi high (MASP: 2414 psi). 2. Mill single string window @8755' 3. Drill build section: 4.25" OH, —344'(40 deg DLS planned). 4. Drill lateral section: 4.25" OH, -2755' (12 deg DLS planned). 6. Run 2-7/8" x 3-1/4" x 3-1/2" L-80 slotted liner to TD. 7. Close in tree, RDMO. Post -Rig Work: 1. V: Valve & tree work 2. T: Portable test separatorflowback. Sundry 323-140 PTD 223-019 Managed Pressure Drilling: The history of CTD at KRU in the Kuparuk reservoir, has demonstrated the benefits of a managed pressure drilling technique. Due to uncertainties about the bottom hole pressures and stability concerns, managed pressure drilling techniques will be employed on this well. The intent is to provide constant bottom hole pressure by using minimum 8.6 ppg drilling fluid in combination with annular friction losses and applied surface pressure. Constant BHP will be utilized to reduce pressure fluctuations to help with hole stability. Applying annular friction and choke pressure also allow use of lighter drilling fluid and minimizes fluid losses and/or fracturing at the end of the long well bores. A MPD choke for regulating surface pressure is located between the WC choke manifold and the mud pits and will be independent of the WC choke. Deployment of the BHA under trapped wellhead pressure will be necessary. Pressure deployment of the BHA will be accomplished utilizing 3" pipe/slip rams (see attached BOP configuration). The annular preventer will act as a secondary containment during deployment and not as a stripper. Operating parameters and fluid densities will be adjusted based on real-time bottom hole pressure measurements while drilling and shale behavior. The following scenario is expected for MPL-121_1: • Latest reservoir pressure in the parent well: 3131 psi (8.4 ppg) MPD Pressure at the MPU L -12L3 Planned Window (8755' MD - 6941' TVD) Operation Details: Mud Program: • Drilling: Minimum MW of 8.4 ppg KCL with Geovis for drilling(0 psi under -balance). Managed pressure used to maintain constant BHP and overbalance. KWF will be stored on location. The tankage will contain 1.5 wellbore volumes of KWF (9.8 ppg expected) to exceed the maximum possible BHP to be encountered as the lateral is drilled. Adjust with real time BHP monitoring. Completion: A minimum MW 9.8 ppg KWF to be used for liner deployment. Disposal: • All cuttings & mud generated during drilling operations will be hauled to the Milne Point "B" pad G&I facility. Hole Size: • 4.25" for entirety of the production hole section. Liner Program: • 2-7/8", 6.5#, L80 slotted liner: 9500' MD -11854'M D • 3-1/4", 6.64, L80 solid liner: 8770' MD -9500' MD • 3-1/2', 9.3#, L80 solid liner: 8630' MD -8770' MD • The primary barrier for this operation: a minimum EMW of 9.8 ppg (522 psi over -balance) • A X -over shall be made up to a safety joint including a TIW valve for all tubulars ran in hole. Dumps On pumps Off A Target BHP at Window (ppg) 4,079 psi 4,079 psi 11.3 B Annular friction - ECD (psi/ft) 525 psi 0 psi 0.06 C Mud Hydrostatic (ppg) 3,104 psi 3,104 psi 8.b S+C Mud +ECD Combined 3,529 psi 3,104 psi (no choke pressure) A-(B+C) Choke Pressure Required to Maintain 449 psi 975 psi Target BHP at window and deeper Operation Details: Mud Program: • Drilling: Minimum MW of 8.4 ppg KCL with Geovis for drilling(0 psi under -balance). Managed pressure used to maintain constant BHP and overbalance. KWF will be stored on location. The tankage will contain 1.5 wellbore volumes of KWF (9.8 ppg expected) to exceed the maximum possible BHP to be encountered as the lateral is drilled. Adjust with real time BHP monitoring. Completion: A minimum MW 9.8 ppg KWF to be used for liner deployment. Disposal: • All cuttings & mud generated during drilling operations will be hauled to the Milne Point "B" pad G&I facility. Hole Size: • 4.25" for entirety of the production hole section. Liner Program: • 2-7/8", 6.5#, L80 slotted liner: 9500' MD -11854'M D • 3-1/4", 6.64, L80 solid liner: 8770' MD -9500' MD • 3-1/2', 9.3#, L80 solid liner: 8630' MD -8770' MD • The primary barrier for this operation: a minimum EMW of 9.8 ppg (522 psi over -balance) • A X -over shall be made up to a safety joint including a TIW valve for all tubulars ran in hole. Well Control: • BOP diagram is attached. • Pipe rams, blind rams and the Cr pack off will be pressure tested to 250 psi and to 3500 psi. • The annular preventer will be tested to 250 psi and 3500 psi. • 1.5 wellbore volumes of KWF will be always on location during drilling operations. • 2-3/8" safetyjoint will be utilized while running 2-7/8", 3-1/4, 3-1/2" solid or slotted liner. Directional: • See attached directional plan. Maximum planned hole angle is 99% inclination at kick off point is 40'. • Magnetic and inclination surveys will betaken every 30 ft. No gyro will be run. • Distance to nearest property line —14600' & Distance to nearest well within pool —3000' Logging: • MWD directional, Gamma Ray, and Resistivity will be run through the entire open hole section. • Real time bore pressure to aid in MPD and ECD management. Perforating: • None Anti -Collision Failures: • None Hazards: • MPL is considered an H2S pad. Most recent H2S reading on MPL-12 was 2 ppm (10/16/22). Max H2S reading on pad on well MPL-32 at 410 ppm. • No fault crossings. • Overall Lost circulation risk is considered low. Reservoir Pressure: • The reservoir pressure is expected to be 3131 psi at 7168' TVDSS (8.4 ppg equivalent at the window). • Maximum expected surface pressure with gas (0.10 psi/ft) to surface is 2414 psi (At TD) Sean McLaughlin CC: Well File Drilling Engineer Joseph Lastufka 223-6784 n corp Alanke, LLC On& RT Elev.: 32.3' 4 s �• Wipaudk Sads FCCt09,214 i m 2/2/12015 TD= 9,335 (MD)/TD=7,394MM) PBID =9,224' (MD) / PSTD=7,3D7(TVO) Milne Point Unit Well: MPU L-12 PROPOSED Last Completed: 2/28/2015 PTD: 193-011 TREE & WELLHEAD Tree I SM FMC 2-916" Wellhead 11"x2-9/16" SM FMC Gen 5, WKM TDF -CS -I Tbg. Hngr., 2-7/8" 8rd Tap and Bottom CIW 2.5" H BPV profile. Top Btm 13-3/8" Conductor 54.5/K-55 BTRC 12.615 Surface 80' 9-5/8" Surface 47/N-80/BTRS.8.681 Oen Surface 2,584' 7" Production I, r 6.276 Surface 2466' 7" Production 1 26 / L-80 / BTRC 6.276 1 2866' 9,322' 9/18/95 Oen Kup. B Silt 8,812' 8,832! 6,987' 7,002' 20 7/1/93 Open Kup. B Silt 8,826' 8,838f 6,998' 7,007' 12 9/18/95 Open Ku .8 Silt 8,854' 8,864' 7019' 7027' 10 TBOTRoatC r HES'BTC'Es. Ku .BSilt 81854' 8,865' Ca9 Fdtdi�: Cemaee, 92,418' 11 9/18/95 Oen Kup. B Silt 1 8,878' 8,888' 7,038' 1 7,046' TCC @z6go, 7/1/93 Open KUP. A3 Sand 81910 usn-log 7,063' 1 7,086' 30 7/1/93 tni/13 T HES ES -Stage . 8,918 81988' 7,069' 7,123' @5,3W 9/18/95 Oen Kup.A2Sand 8950' RQ Tag in Tuhi, 7,094' 7,111' 30 7/1/93 (@ 8,6UT Ku .A3 Sand 9,0301 9,048' 7,156' 7170' 18 9/18/95 2 - 9,030' 9,050' 7,156' f 7,171' 1 3 4 s �• Wipaudk Sads FCCt09,214 i m 2/2/12015 TD= 9,335 (MD)/TD=7,394MM) PBID =9,224' (MD) / PSTD=7,3D7(TVO) Milne Point Unit Well: MPU L-12 PROPOSED Last Completed: 2/28/2015 PTD: 193-011 TREE & WELLHEAD Tree I SM FMC 2-916" Wellhead 11"x2-9/16" SM FMC Gen 5, WKM TDF -CS -I Tbg. Hngr., 2-7/8" 8rd Tap and Bottom CIW 2.5" H BPV profile. OPEN HOLE / CEMENT DETAIL 9-5/8" Cmt w 900 sx PF'C, 2355 sx Class'G' in 12-1/4" Hole 7° Cmt w/STI 385 sx Class'G', ST II 195 sx Class'G' cement in 8-1/2" Hole WELL INCLINATION DETAIL KOP III 900' Max Hole Angle =42to46 deg. from 2,300' to 7450' Hole Angle through perforations =39 deg. Size Type Wt/Grade/Conn ID Top Btm 13-3/8" Conductor 54.5/K-55 BTRC 12.615 Surface 80' 9-5/8" Surface 47/N-80/BTRS.8.681 Oen Surface 2,584' 7" Production 26/L-80/VAM 6.276 Surface 2466' 7" Production 1 26 / L-80 / BTRC 6.276 1 2866' 9,322' TUBING DETAIL 41/2" 1 Tubing 12.6 / L-80 / EUE 8rd j 3.958 Surface 1 18,70571 JEWELRY DETAIL No Depth I Item 1 2A61! 7' BOT Pa ne'ECP' Inflatable Packer 2 t8 50' Slidin Sleeve 3 38 500' Packer 4 ±8,56V K Nipple Oen ±8,648' W LEG: Btm @18,650' PERFORATION DETAIL Sands Top (MD) Btm (MD) Top (TVD) Stm (TVD) FT Date Status Kup. C Sands 8,751' 8,771' 5,941' 6,956' 21 7/1/93 Oen Ku .0 Sands 8,751' 8,770' 6,941' 6,955' 20 9/18/95 Open Kup. B Silt 8,800' 81815' 6,978' 6,989' 15 9/18/95 Oen Kup. B Silt 8,812' 8,832! 6,987' 7,002' 20 7/1/93 Open Kup. B Silt 8,826' 8,838f 6,998' 7,007' 12 9/18/95 Open Ku .8 Silt 8,854' 8,864' 7019' 7027' 10 7/1/93 O n Ku .BSilt 81854' 8,865' 7,019' 7,028' 11 9/18/95 Oen Kup. B Silt 1 8,878' 8,888' 7,038' 1 7,046' 10 7/1/93 Open KUP. A3 Sand 81910 8,940' 7,063' 1 7,086' 30 7/1/93 Oen Ku .A3&A2Sand 8,918 81988' 7,069' 7,123' 70 9/18/95 Oen Kup.A2Sand 8950' 8,980 7,094' 7,111' 30 7/1/93 0 en Ku .A3 Sand 9,0301 9,048' 7,156' 7170' 18 9/18/95 Oen Ku .A1 Sand 9,030' 9,050' 7,156' f 7,171' 1 20 1 7/1/93 1 Open Perforation Data for Re -perforation Data 7/1/93:21gm 348 Hyperjet 11 Charges @ 30 deg. phasing, EHD= 0.42", TP =17.1" for 9/18/93: 21gm Alpha let charges @ 60 deg. phasing, EHD=0.418, TTP- 22.8" GENERAL WELL INFO Nr)TF(Z- API: 50-029-22334-00-00 Casing was tested to 2,000psi from 2,585' during the 1/24/13 RWO post casing repair. Drilled, Cased and Completed by Nabors 22E-7/5/1993 RWO by Nabors 4ES-9/22/1995 Casing shows axial displacement at 2,675'to 2,760', 2,950' to 2,960'& 3,094'to 3,104' during the 1/24/13 RWO. Trouble passing thru 2864'to 2894'when running completion Frac Ku aruk'A'Sand-4/24/2001 ESP Replacement w/ Nabors 4 -ES -5/13/2001 ESP Replacement wNabors 3-S- 232006 RWO-Remove Pkr, FCO & Replace ESP w/ Nabors 3-S - 2/2/2009 The hanger had to be oriented after N/D the BOP's due to the alignment pin not lining the BOP bolts up. ESP Replacement w/ Nabors 4ES-5/122010 Re air Casin & Re lace ESP w/ Doyon 16 -1/24/2013 ESP Chan eout w/ Nordic #3 - 2/28/2015 Revised By: TDF 2/6/2023 n earP Alaska, LLC Odg. KBDev.:SLO'/Orifi GLDev.: 15.4' L3 318 1 95/8" T HES'BTC ES. Cwr*rter@Z41e r HFS FS -w M Tag h Turing OE07- Wipdoksat @87W - FCOto9,214' an 1/2-p2015 Milne Point Unit Well: MPU L-12 PROPOSED Last Completed: 2/28/2015 PTD: 193-011 TREE & WELLHEAD Tree 5M FMC 2-916" Wellhead 11'x2-9/16"SM FMC Gen 5, WKM TDF -CS -1 Tbg. Hngr., 2-7/8" 8rd Top and Bottom, CIW 2.5" H BPV rofile. OPEN HOLE / CEMENT DETAIL 24" 1 250sx Permafrost 12-1/4" 1 Cmt w/ 990 m Arctic Set [V 235 sx Class'G' 8-12' I Cmtw St 1:385 sx Class'G St 2:195sx Class'G' WELL INCLINATION DETAIL KOP La 900' Max Hole Angle =42 to 46 deg. from 2,300' to 7,450' 7 BOTBort Cdla & Csg P8tch@z461' TOC 49zew L61Tkig 1/11113 14,parudcSauls TD m9,335 INO)/TD=7,394(IVD) PBTD=9,224' (MD)/PBTD=7,307(TVD) Size Type Wt/Grade/Conn ID lop Btm 13-3/8" Conductor 54.5 / K-55 / BTRC 12.615 Surface 110' 9-5/8" Surface 47 / r, / BTRS. 8.681 Surface 2,584' 7" Production 26 / L-80 / VAM 6.276 Surface 2,466' 7" Production 26 / L-80 / BTRC 6.276 2,466' 9,322' TUBING DETAIL 4-1/2" Tubing 12.6/L-80/EUESrd 1 3.958 1 Surface 1 18,700' JEWELRY DETAIL No Depth I Item 1 2,461' 7" BOT Pa wne'ECP' Inflatable Packer 2 ±8450' Sliding Sleeve 3 ±8500' Packer 4 +856(Y KNipple Open ±8,648' WLEG: Bun @ ±8,650' PERFORATION DETAIL Sands Top (MD) 8tm (MD) Top (TVD) Btm (TVD) FT Date Status Kue. C Sands 8,751' 8,771' 6,941' 6,956' 21 7/1/93 Open Kup. C Sands 8,751' 8,770 6,941' 6,955' 2D 9/18/95 Open Kup. B Silt 8,800, 81815' 6,978' 6,989' 15 9/18/95 Open Kup. B Silt 8,81Z 8,932' 6,987' 7,002' 20 7/1/93 Open Kup. B Silt 8,826' 8,838! 6,998, 7,007' 12 9/18/95 Open Kup. B Silt 8,854' 8,864' 7,019' 7027' SO 7/1/93 Oen Kup. B Silt 8,854' 8,865' 7,019' 7,028' 11 9/18/95 Open Kup. B Silt 1 8,878' 1 8,888' 1 7,038' 7,046' 10 1 711/93 Oen Ku .A35and 8,910 8940 7063' 7,086' 30 7/1/93 Oen Ku .A3&A2Sand 81918' 81988' 7,069' 7123' 70 9/18/95 Open Kup. A2 Sand 8950 8,980 7094' 7,111' 30 71/93 Open Kup. At Sand 9,030 9,048' 7,156' 7,170' 18 91895 Open Kup. Al Sand 9,030 9,050' 1 7,156' 7,171' 20 7/1/93 Open Perforation Data for Re -perforation Data 7/1/93:23gm 346 Hyperjet II Charges @130 deg. phasing, EHD=0,42", TP =17.1' for 9/18/93: 21gm Alpha let charges ® 60 deg. phasin& EHD=0.418, TTP=22.8" GENERAL WELL INFO API: 50-029-22334-00-00 Drilled, Cased and Completed by Nabors 22E - 7/5/1993 RWO by Nabors 4ES-9/22/1995 Frac Kuparuk'A' Sand -4/24 001 ESP Re placement w/ Nabors 4 -ES- 5/13/2001 ESP Replacement wNabors 3-S-2/23/2006 RWO-Remove Pkr, FCO & Replace ESP w/ Nabors 3-S-2/2/2009 ESP Rep,laceme nt w/ Na bors 4ES - 5/12/2010 Re it Casfn & Replace ESP w/ Do on 16 -1/24/2013 ESPChan soot w/Nordic83-2/28 2015 NOTES: Casing was tested to 2,000ps1 from 2,585' during the 1/24/13 RWO post casing repair. Using shows axial displacement at 2,675' to 2,760', 2,950' to 2,960' & 3,094' to 3,104' during the 1/24/13 RWO. Trouble passing thru 2,864'to 2,894' when running completion The hanger had to be oriented after N/D the BOP's due to the alignment pin not lining the BOP bolts up. Revised By: JNL 2/27/2023 n .m 41.ku, LLC Orig. KB Elev.:510 /Orifi GL Elev.: 15.4' 0 .J- 95/8" 7 t1EB'ET FS Cerenbr@2,419 RA Tag In Tubing @ee9r- ©1 H, r BOTRc®tCdlar 8 C69 Palm® 2.461' TDC @2180 US1Tkg 1/11113 �ano� TD=9,335' (Nu) /TD=7,394' (7VD) ' PBTD=9,244' (PM)/PBfD=7,307 MM PROPOSED Milne Point Unit Well: MPU L-12 / L-121-1 Last Completed: 2/28/2015 PTD: 193-011. / TBD TREE & WELLHEAD Tree 5M FMC 2-9/16" Wellhead 11" x 2-9/16" SM FMC Gen 5, WKM TDF -CS -1 Tbg. Hngr., 2-7/8" 8rd Top and Bottom CIW 2.5" H BPI/rofile. OPEN HOLE / CEMENT DETAIL 24" 37/4" 12-1 4" @8710 8- 2" I Cmt w/ Stg 1:385 sx Class'G', Sia 2:195 sx Class'G' V4Ypskdcsa I Uncemented5olid/Slotted Uner GTW 12.615 Surface 110' FCOk9,214' V.,3-1 an 2P2712015 8.681 TD=9,335' (Nu) /TD=7,394' (7VD) ' PBTD=9,244' (PM)/PBfD=7,307 MM PROPOSED Milne Point Unit Well: MPU L-12 / L-121-1 Last Completed: 2/28/2015 PTD: 193-011. / TBD TREE & WELLHEAD Tree 5M FMC 2-9/16" Wellhead 11" x 2-9/16" SM FMC Gen 5, WKM TDF -CS -1 Tbg. Hngr., 2-7/8" 8rd Top and Bottom CIW 2.5" H BPI/rofile. OPEN HOLE / CEMENT DETAIL 24" 2505x Permafrost C 12-1 4" Cmt w/ 990 sx Arctic Set IV, 235 sx Class'G' 8- 2" I Cmt w/ Stg 1:385 sx Class'G', Sia 2:195 sx Class'G' 1-3:4-14" I Uncemented5olid/Slotted Uner WELL INCLINATION DETAIL KOP @ 900' / Max Hole Angle = 42 to 46 deg. from 2,3W to 7 450' Ll KOP @ 8,755' L3 90 deg Angle = 9.070' CASING DETAIL Size Type Wt/Grade/Conn ID Top I Btm 13-38" Conductor 54.5 / K-55 / BTRC 12.615 Surface 110' 9-5/8" Surface 47 / N-80 / BTRS. 8.681 Surface 1 2,584' 7" Production 26 / L-80 / VAM & BTRC 6.276 Surface 1 2,466' 3 -1/2"x3 -1/4"x2-7/8" Solid/Slotted Liner 9.34.64.5 JL-80/STIxTCII 2.441 8.500 I 9,32Z TUBING DETAIL 4-1/2" Tubing 12.6 L-80/EUE Srd 3.958 1 Surface 1 ±8700' JEWELRY DETAIL No Depth Item 1 2,461' 7" BOT Pa 2one'ECP' Inflatable Packer 2 ±8454 Slidin Sleeve 3 ±8500' Packer 4 +056(y Xhlipple 5 ±8,648' WLEG: Urn @ ±8,650' 6 ±8750' Wh" stock 7 ±8 730' 3-1/2" xo 3-1/4" 8 1 19 450' 3-1/4" xo 2-7/8" PERFORATION DETAIL Sands Top (MD) Stm (MD) Top (TVD) Btm (TVD) FT Date Status KUP. CSands 8,751' 8,771' 6,941' 6,956' 21 7/1/93 Open Kup. C Sands 8,751' 8,770e 6,941' 6,955' 20 9/18/95 Open Kup. B Silt 8,000' 8,815' 6,978' 61989' 15 9/18/95 Oen Kup. B Silt 8,812' 8,832' 6,987' 7 002' 20 7/1/93 Open Kup. B Silt 8,826' 8838' 6,998' 7,007' 12 9/18195 Open Kup. 8Silt 8,854' 8,864' 7,019' 7,027' 30 7/1/93 Open Kup. B Silt 8,854' 8,865' 7,019' 7 028' 11 9/18/95 Oen Kup. B Silt 8,878' 8,888' 7,038' 7,046' 10 1 7/1/93 Open Kup. A3 Sand 8710' 8940' 7,063' 7,086' 30 1 7/1/93 Oen (Up. AMA2 Sand 8,918' 81988' 7,069' 7,123' 70 9/18/95 Open K ,.A2Sand 8950' 81980' 7,094' 7,111' 30 7/1/93 Open Ku .A1Send 9,030' 9048' 7156' 7,171' 170' 18 9/18/95 Open Ku .A3Sand 9,030' 9,050' 7,156' 7 2D 71/93 Oen L-121-1: Perforation Data for 7/l/93:21gm 34B Hyperyet II Charges @ 30 deg. phasing, EH D= 0.42", TP =17.1" Re -perforation Data for 9/18/93: 21gm Alpha Jet charges@ 60 deg. phasing, EHD=0.418, TTP- 22.8' Revised By: JNL 2/27/2023 GENERAL WELL INFO API: 50-029-22334-00-00 Drilled Cased and Completed bNabors 22E -7/5/1993 RWO by Nabors 4ES-9/22/1995 Frac Ku aruk'A' Sand -4/24 2001 ESP Replacement w/ Nabors 4 -ES -5/13/2001 ESP Replacement w/ Nabors 3-S - 2/23/2006 RWD-Remove Pkr, FCO & Replace ESP w/ Nabors 3-5-2/2/2009 ESP Replacement w/ Nabors 4ES -5/12/2010 R ESP aCPw Doyon 16-1/24/2013ihCEA3 - 2/28/2015 NOTES: Casing was tested to 2,000psi from 2,585' durlM the 1/24/13 RWO post casing repair. Casing shows axial displacement at 2,675' to 2,760', 2,950'to 2,960' & 3,094' to 3,104' during the 1/24/13 RWO. Trouble passing thru The hanger had to be oriented after N/D the BOP's due to the alignment pin not lining the BOP bolts up. Hilcorp Alaska, LLC Milne Point M Pt L Pad Plan: MPL-12 Plan: MPL-12L1 Plan: MPL-121-1 wp03a Standard Proposal Report 06 March, 2023 HALLIBURTON Sperry Drilling Services WI p J N N � J Od 0-aJ CL C4 m cd m (d (L �iaag 6m -m e Ca y � o oN3am IL � G O fin' o' c mN� � oma$ w TLGO m 00 P m.6 r 0..00 D Am�oi �{`���InONnl�lmltNrO� immmOmOm��(�1��'mmr u$$$ovojq, Wed o eoagog0000 N �$S00000000000000 g0000000000000 G OmONNN N"'[�I" ^'^ �cg�j °m'q$o'rym M202.wPa'v Zi. inn<mmmm0•mmNO!fyp^ 'N Iq� em�mmp`crioe Nm0 �mNo$$imo�ma �inmm mmrnnnnnnnnnnnn (y'mNOfrOA�O'm�m�Of m m N N m Ntp N m N m N m N �ao';�am$�o'm, ami•,m,dd mcym a cno $$$mmm$m$m3mmm d • �2� �(Y n6Ilk, 0 m n rv� v�aa O�alal J V � N N ym� i Q K a a �r 0 i a aL N 009) 4080 Ieoi4eq C • �2� �(Y n6Ilk, 0 g n v�aa O�alal 009) 4080 Ieoi4eq C m 0 g n N J V � J r � J K � a o i N N m o m OOS IL � C O N m r 7 0 00011 um O m m N m 0 0osat o ul a m U 00001 o J N � O p 00 2mqg o�o J O m nmd ai - ' m d N._U1 om $ oN3ad 7 005) _)y7^oS i C 8 Standard Proposal Report Database: NORTH US + CANADA Local Coordinate Reference: Well Plan: MPL-12 Dip Angle Company: Hilcorp Alaska, LLC TVD Reference: MPL-12 RKB @ 51.00usft Project: Milne Point MD Reference: MPL-12 RKB @ 51.00usft (1) Site: M Pt L Pad North Reference: True Well: Plan: MPL-12 Survey Calculation Method: Minimum Curvature Wellbore: Plan: MPL-12L1 Design MPL 121.1 wp03a Design: MPL-121.1 wpO3a Project Milne Point, ACT, MILNE POINT Audit Notes: Map System: US State Plane 1927 (Exact solution) System Datum: Mean Sea Level Geo Datum: NAD 1927 (NADCON CONUS) Using Well Reference Point Map Zone: Alaska Zane 04 PLAN Using geodetic scale factor Depth: Site M Pt L Pad, TR -13-10 Vertical Section: Site Position: Northing: 6,029,799.280usft Latitude: +E7 -W 70' 29' 32.2303 N From: Map Fasting: 544,529.550usft Longitude: 1490 38' 9.4119 W Position Uncertainty: 0.00 usft Slot Radius: 0" Grid Convergence: 0.34 - Well Plan: MPL-12, MPL-12 0 Well Position +N/ -S O.OD usft Northing: 6,031,361.473 usft Latitude: 70.29'47.5762N +E1 -W 0.00 usft Easting: 544,853.595 usfl Longitude: 149° 37'59.5974 W Position Uncertainty 0.50 usft Wellhead Elevation: 17.00 usft Ground Level: 15.40usft Wellbore Plan: MPL-121.1 Magnetics Model Name Sample Date Declination Dip Angle Field Strength (6) (1) (nT) BGGM2022 2/16/2023 14.89 80.79 57,287.33332169 Design MPL 121.1 wp03a Audit Notes: Version: Phase: PLAN Tie On Depth: 8,755.00 Vertical Section: Depth From (TVD) +WS +E7 -W Direction (usft) (usft) (usft) 0 35.60 -2,428.10 2,988.57 299.53 Plan Sections Measured Vertical TVD Dogleg Build Tum Depth Inclination Azimuth Depth System +N/ -S +EPW Rate Rate Rate Tool Face (usft) (-) V) (usft) usft (usft) (usft) (°1100usft) (°NOOusft) ('1100usft) (1) 8,755.00 40.17 124.23 6,941.39 6,890.39 -3,107.33 3,716.25 0.00 0.00 0.00 0.00 8,785.00 37.47 124.23 6,964.76 6,913.76 .3,117.91 3,731.79 9.00 -9.00 0.00 180.00 9,088.94 99.00 352.57 7,128.00 7,077.00 -2,954.70 3,827.90 40.00 20.24 -43.32 240.00 9,286.94 96.19 328.51 7,101.17 7,050.17 -2,769.26 3,762.24 12.00 -1.40 -12.03 -95.00 9,58&94 88.33 293.33 7,088.96 7,037,96 -2,576.33 3,539.29 12.00 -2.62 -11.73 -101.50 9,738.94 88.41 275.32 7,093.27 7,042.27 -2,539.39 3,394,61 12.00 0.05 -12.00 -90.00 9,988.94 88.62 305.33 7,099.91 7,041191 -2,453.57 3,162.93 12.00 0.09 12.00 90.00 10,213.94 88.32 278.32 7,106,03 7,055.03 -2,370.71 2,956.06 12.00 -0.13 -12.00 -91.00 10,488.94 86.96 311.32 7,117.69 7,066.69 -2,256,99 2,710.12 12.00 -0.50 12.00 93.00 10,688.94 86.00 287.30 7,130.16 7,079.16 -2,159.97 2,537.34 12.00 -0.48 -12.01 -93.00 10,888.94 85.94 311.36 7,144.43 7,093.43 -2,062.99 2,364.69 12.00 -0.03 12.03 91.00 11,098.94 86.33 286.10 7,15&83 7,107.83 -1,963.11 2,182.46 12.00 0.18 -12.03 -90.00 11,303.94 86.66 310.75 7,171.57 7.120.57 -1,866.46 2,003.90 12.00 0.16 12.02 90.00 11,503.94 86.95 286.71 7,182.89 7,131.89 -1,771.19 1,830.08 12.00 0.14 -12.02 -90.00 11,703.94 87.21 310.74 7,193.22 7,142.22 -1,675.90 1,656.21 12.00 0.13 12.02 90.00 11,853.94 87,35 292.72 7,200.40 7,149.40 -1,597.43 1,529.30 12,00 0.09 -12.01 -90.00 3/6/2023 5: 18: 35PM Page 2 COMPASS 5000.15 Build 91E H ALL I B U R TO N Standard Proposal Report Database: NORTH US + CANADA Local Coordinate Reference: Well Plan: MPL-12 Company: HlcorpAlaska, LLC TVD Reference: MPL-12 RKB @ 51.00usft Project: Milne Point MD Reference: MPL-12 RKB @ 51.00usft Site: M Pt L Pad Norge Reference: True Well: Plan: MPL-12 Survey Calculation Method: Minimum Curvature Wellbore: Plan: MPL-12LI DLS Vert Section Design: MPL-121-1 wp03a 0 (0) I Planned Survey Measured Vertical Map Map Depth Inclination Azimuth Depth TVDss +K1 -S +F1 -W Northing Easting DLS Vert Section (usft) 0 (0) (usft) usft (usft) (usft) Waft) (usft) -1S40 35.60 0.00 0.00 35.60 -15.40 D.OD 0.00 6,031,361.473 544,853.595 0.000 3,797.06 431.00 0.40 359.30 431.00 380.00 1.38 -0.02 6,031,362.853 544,853.570 0.101 3,797.75 823.00 0.60 70.90 822.98 771.98 3.42 1.91 6,031,364.904 544,855.480 0.155 3,797.08 88ZOD 1.70 112.60 881.97 830.97 3.18 3.01 6,031,364.676 544,856.581 2.227 3,796.01 971.00 4.90 122.80 970.81 919.81 0.62 7.42 6,031,362.136 544,861.011 3.641 3,790.90 1,062.00 7.10 130.10 1,061.31 1,010.31 -5.11 14.99 6,031,356.453 544,868.615 2.554 3,781.49 1,152.00 10.40 133.20 1,150.25 1,099.25 -14.26 25.17 6,031,347.370 544,878.848 3.703 3,768.13 1,247.00 12.90 132.90 1,243.29 1,192.29 -27.35 39.19 6,031,334.365 544,892.946 2.632 3,749.48 1,340.00 16.40 131.80 1,333.25 1,282.25 -43.17 56.59 6,031,318.650 544,910.437 3.775 3,726.54 1,435.00 17.60 134.00 1,424.10 1,373.10 -62.09 76.92 6,031,299.858 544,930.879 1.433 3,699.53 1,530.00 17.10 133.10 1,514.78 1,463.78 -81.61 97.45 6,031,280.463 544,951.524 0.597 3,672.05 1,625.00 19.20 131.20 1,605.05 1,554.05 -101.44 119.40 6,031,260.763 544,973.596 2.296 3,643.17 1,721.00 23.20 130.70 1,694.53 1,643.53 -124.16 145.63 6,031,238.186 544,999.954 4.171 3,609.14 1,814.00 23.70 131.10 1,779.85 1,728.85 -148.41 173.60 6,031,214.125 545,028.069 0.564 3,572.86 1,908.01) 25.30 133.20 1,865.38 1,814.38 -174.58 202.48 6,031,188.132 545,057.104 1,938 3,534.84 2,003.00 29.10 131.30 1,949.86 1,898.86 -203.74 234.64 6,031,159.176 545,089.441 4.103 3,492.48 2,097.00 32.30 131.40 2,030.68 1,979.68 -235.44 270.66 6,031,127.694 545,125.649 3.405 3,445.51 2,191.00 35.80 131.50 2,108.55 2,057.55 -270.28 310.11 6,031,093.099 545,165.296 3.724 3,394.03 2,286.00 38.60 131.60 2,184.21 2,133.21 -30&37 353.09 6,031,055.269 645,208.500 2.948 3,337.86 2,381.00 42.70 132.20 2,256.28 2,205.28 -349.70 399.13 6,031,014.221 545,254.788 4.335 3,277,42 2,466.14 42.70 131.58 2,318.85 2,267.85 -388.25 442.11 6,030,975.933 545,297.997 0.494 3,221.02 CASING PATCH 2,477.00 42.70 131.50 2,326.83 2,275.83 -393.14 447.62 6,030,971.083 545,303.539 0.494 3,213.82 2,571.00 42.80 131.90 2,395.86 2,344.86 -435.58 495.26 6,030,928.929 545,351.430 0.308 3,151.45 2,667,00 42.50 131.30 2,466.46 2,415.46 -478.77 543.90 6,030,886.044 545,400.322 0.526 3,087.85 2,857.00 42.10 134,60 2,607.01 2,556.01 -565.86 637.48 6,030,799.528 545,494.415 1.188 2,963.50 3,045.00 40.70 133.20 2,748.03 2,697.03 -652.07 727.04 6,030,713.861 545,584.487 0.893 2,843.08 3,236.00 42.20 137.40 2,891.22 2,840.22 -741.95 815.88 6,030,624.534 545,673.859 1.654 2,721.49 3,425.00 44.10 133.90 3,029.12 2,978.12 -634.30 906.26 6,030,532.742 545,764.78D 1.617 2,597.34 3,615.00 43.90 132.90 3,165.79 3,114.79 -924.98 1,002.15 6,030,442.647 545,861.209 0.380 2,469.21 3,899.00 44.60 129.30 3,369.26 3,318.26 -1,055.18 1,151.46 6,030,313.363 546,011.288 0.918 2,275.13 4,085.00 46.30 129.70 3,499.74 3,448.74 -1,139.49 1,253.73 6,030,229.675 546,114.056 0.927 2,144.59 4,276.00 46.10 132.50 3,631.95 3,580.95 -1,230.10 1,357.60 6,030,139.711 546,218.457 1.063 2,009.56 4,465.DD 44.50 131.10 3,764.89 3,713.89 -1,319.65 1,457.72 6,030,050.773 546,319.110 0.997 1,878.30 4,654.00 44.30 132.10 3,899.93 3,848.93 -1,407.44 1,556.61 6,029,963.589 546,418.514 0.385 1,749.00 4,843.00 43.50 130.00 4,036.12 3,985.12 -1,493.51 1,655.42 6,029,878.128 546,517.830 0.879 1,620.60 5,032.00 43.20 130.40 4,173.55 4,122.55 -1,577,25 1,754.51 6,029,794.995 546,617.418 0.215 1,493.11 5,222.00 42.90 129.00 4,312.40 4,261.40 -1,660.09 1,864.29 6,029,712.759 546,717.690 0.527 1,365.46 5,508.00 43.70 128.30 4,520.54 4,469.54 -1,782.59 2,007.48 6,029,591.203 546,871.598 0.326 1,171.80 5,788.00 44.20 126.50 4,722.13 4,671.13 -1,900.60 2,161.85 6,029,474.139 547,026.664 0.481 979.32 6,074.00 43.20 127.60 4,928.90 4,877.90 -2,019.63 2,319.56 6,029,356.072 547,185.068 OA39 783.43 6,357.00 42.30 128.60 5,136.72 5,085.72 -2,138.15 2,470.73 6,029,238.480 547,336.940 0.398 593.48 6,645.00 42.50 127.60 5,349.39 5,298.39 -2,257.97 2,623.55 6,029,119.594 547,490.465 0.244 401.46 6,688.00 42.39 127.85 5,381.12 5,330.12 -2,275.73 2,646,50 6,029,101.977 547,513.524 0.465 372.73 95181, 3W2023 5.18.35PM Page 3 COMPASS 5000.15 Build 91E H4LLIBURTON Database: NORTH US+CANADA Company: Hilcorp Alaska, LLC Project: Milne Point She: M Pt L Pad Well: Plan: MPL-12 Wellbore: Plan: MPL-121-1 Design: MPL-121-1 wp03a Planned Survey Loral Coordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Measured Map 40.000 Vertical Northing Easting DLS Depth Inclination Azimuth Depth TVDs9 +WS +EI W (usft) (°) V) (usft) usft (usft) (usft) 6,933.00 41.80 129.30 5,562.92 5,511.92 -2,378.13 2,774.91 7,214.00 42.50 129.70 5,771.25 5,720.25 -2,498.08 2,920.41 7,49&00 41.20 129.00 5,982.80 5,931.80 -2,618.22 3,06&92 7,785.00 40.00 127.60 6,200.71 6,149.71 -2,733.99 3,213.47 8,069.00 40.30 127.60 6,417.79 6,366.79 -2,845.72 3,358.55 8,254.00 40.10 126.90 6,559.09 6,508.09 -2,918.00 3,453.60 8,543.00 40.40 125.80 6,779.67 6,728.67 -3,02&67 3,603.99 8,755.00 40.17 124.23 6,941.39 6,890.39 -3,107.33 3,716.25 KOP : Start Dir 9°1100' : 8755' MD, 6941.397W : 180° RT TF - 7" TOW 8,785.00 37.47 124.23 6,964.76 6,913.76 -3,117.91 3,731.79 Start Dir 400/100' : 8786' MD, 6964.76'TVD 40.000 -1,030.07 6,028,352.511 8,790.00 36.51 121.32 6,968.75 6,917.75 -3,119.54 3,734.32 8,800.00 34.81 115.11 6,976.88 6,925.88 3,122.30 3,739.45 8,810.00 33.45 108.40 6,985.16 6,934.16 3,124.38 3,744.65 8,820.00 32.47 101.27 6,993.66 6,942.56 5,125.77 3,749.90 8,830.00 31.92 93.83 7,002.02 6,951.02 3,126.48 3,755.17 8,840.00 31.81 86.25 7,010.52 6,959.52 -3,126.48 3,760.44 8,850.00 32.15 78.72 7,019.00 6,968.00 5,121179 3,765.68 8,850.00 32.92 71.42 7,027.44 6,976.44 -3,124.40 3,770.87 8,870.00 34.10 64.49 7,035.78 6,984.78 -3,122.32 3,775.98 8,880.00 35.64 58,03 7,043.99 6,992.99 -3,119.57 3,780.98 8,890.00 37.50 52.08 7,052.02 7,001.02 -3,116.16 3,785.86 8,900.00 39.63 46.65 7,059.84 7,008.84 -3,112.10 3,790.58 8,910.00 42.00 41,71 7,067.41 7,016.41 -3,107.41 3,795.13 8,920.00 44.55 37.22 7,074.69 7,023.69 -3,102.12 3,799.48 8,930.00 47.27 33.13 7,081.65 7,030.65 -3,096.24 3,803.61 8,940.00 50.12 29.39 7,088.25 7,037.25 -3,089.82 3,807.50 8,950.00 53.08 25.96 7,094.46 7,043.46 -3,082.88 3,811.13 8,960.00 56.13 22.79 7,100.25 7,049.25 -3,075.46 3,814,49 8,970.00 59.26 19.83 7,105.60 7,054.60 -3,067.59 3,817.56 8,980.00 62.45 17.07 7,110.47 7,059A7 -3,059.30 3,820.32 8,990.00 65.69 14.46 7,114.84 7,063.84 -3,050.65 3,822.76 9,000.00 68.97 11.99 7,118.70 7,067.70 -3,041.67 3,824.87 9,010.00 72.29 9.62 7,122.01 7,071.01 -3,032.40 3,826.63 9,020.00 75.64 7.33 7,124,78 7,073.78 -3,022.90 3,828.05 9,030.00 79.00 5.12 7,126.97 7,075.97 3,013.20 3,829.11 9,040.00 82.38 2.95 7,128.59 7,077.59 -3,003.36 3,829.80 9,050.00 85.78 0.82 7,129.62 7,078.62 -2,993.42 3,830.13 9,060.00 89.17 358.71 7,130.06 7,079.06 -2,983.43 3,830.09 9,070.00 92.57 356.60 7,129.91 7,078.91 -2,973.44 3,829.68 9,080.00 95.97 354.48 7,129.16 7,078.16 -2,963.50 3,828.90 9,088.94 99.00 352.57 7,128.00 7,077.00 -2,954.70 3,827,90 Start Dir 1201100' : 9088.94' MD, 7128'TVD 9,100.00 98,88 351.23 7,126.28 7,075.28 -2,943.68 3,826.36 9,125.00 98.60 348.21 7,122.48 7,071.48 -2,919.57 3,821.95 Standard Proposal Report Well Plan: MPL-12 MPL-12 RKB @ 51.00usft MPL-12 RKB @ 51.00usft True Minimum Curvature Map Map 40.000 -989.65 Northing Easting DLS Vert Section (usft) (usft) 5,511.92 -1,001.03 6,029,000.365 547,642.531 0.465 210.54 6,028,881.309 547,788.740 0.267 24.82 6,028,762.058 547,935.956 0.486 -161.87 6,028,647.185 548,083.184 0.525 -346.44 6,028,536.343 548,228.926 0.106 -527.74 6,028,464.647 548,324.399 0.267 -646.07 6,028,354.898 648,475.442 0.267 -831.47 6,028,276.926 548,588.159 0.489 -967.91 6,028,266.441 548,603.768 9.000 -986.65 6,028,264.827 548,606.306 40.000 -989.65 6,028,262.100 548,611.450 40.000 -995.47 6,028,260.050 548,616.663 40.000 -1,001.03 6,028,258.687 548,621.920 40.000 -1,006.28 6,028,258.018 548,627.196 40.000 -1,011.22 6,028.258.046 648,632.465 40.000 -1,015.80 6,028,258.770 548,637.702 40.000 -1,020.02 6,028,260.189 548,642.880 40.000 -1,023.85 6,028,262.293 548,647.974 40.000 -1,027.27 6,028,265.074 548,652.961 40.000 -1,030.27 8,028,268.518 548,657.815 40.000 -1,032.83 6,028,272.607 548,662.512 40.000 -1,034.94 6,028,277.323 648,667.031 40.000 -1,036.58 6,028,282.642 548,671.348 40.000 -1,037.76 6,028,288.537 548,675.443 40.000 -1,038.46 6,028,294.981 548,679.296 40.000 -1,038.68 6,028,301.942 548,682.888 40.000 -1,038.43 6,028,309.386 548,686.202 40.000 -1,037.69 6,028,317.277 548,689.222 40.000 -1,036.48 6,028,325.576 548,691.932 40.000 -1,034.80 6,028,334.244 548,694.319 40.000 -1,032.66 6,028,343.236 548,696.373 40.000 -1,030.07 6,028,352.511 548,698.083 40.000 -1,027.04 6,028,362.023 548,699.440 40.000 -1,023.58 6,028,371,724 548,700.438 40.000 -1,019.73 6,028,381.569 548,701.072 40.000 -1,015.48 6,028,391.510 548,701.339 40.000 -1,010.87 6,028,401 A96 548,701.239 40.000 -1,005.91 6,028,411.481 648,700.770 40.000 -1,000.63 6,028,421.415 648,699.936 40.000 -995.06 6,028,430.214 548,698.884 40.000 -989.85 6,028,441.020 548,697.279 12.001 -983.18 6,028,465.300 548,692.722 12.000 -967.36 3/62023 5:18:35PM Page 4 COMPASS 5000.15 Buil! 91E H A.LLI B U R TO N Standard Proposal Report Database: NORTH US + CANADA Local Co-ordinate Reference: Well Plan: MPL-12 Company: Hilcorp Alaska, LLC TVD Reference: MPL-12 RKB @ 51.00usft Project: Milne Point MD Reference: MPL-12 RKB @ 51.00usft Site: M Pt L Pad North Reference: True Well: Plan: MPL-12 Survey Calculation Method: Minimum Curvature Wellbore: Plan: MPL-121-1 V) V) Design: MPL-121-1 wp03a (usft) (usft) Planned Survey Measured Vertical Map Map Depth Inclination Aamuth Depth TVDss +N/ -S +Ef-W Northing Easting DL8 Vert Section (usft) V) V) (usft) usft (usft) (usft) (usft) (usft) 7,067.81 9,150.00 98.29 345.19 7,118.81 7,067.81 -2,895.51 3,816.26 6,028,489.326 546,686.888 12.000 -950.55 9,175.00 97.96 342.18 7,115.27 7,064.27 -2,871.76 3,809.31 6,028,513.030 548,679.793 12.000 -932.80 9,200.00 97.61 339.17 7,111.89 7,060.89 -2,848.39 3,801.12 6,028,536.349 548,671.456 12.000 -914.15 9,225.00 97.23 336.17 7,108.66 7,057.66 -2,825.46 3,791.70 6,028,559.218 548,661.901 12.000 -894.65 9,250.00 96.84 333.17 7,105.59 7,054.59 -2,803.04 3,781.08 6,028,581.575 548,651.152 12.000 -874.37 9,275.00 96.43 330.18 7,102.70 7,051.70 -2,781.18 3,769.30 6,028,603.358 548,639.241 12.000 -853.35 9,288.94 96.19 328.51 7,101.17 7,050.17 -2,769.26 3,762.24 6,028,615.235 548,632.105 12.000 -841.32 9,300.00 95.93 327.21 7,100.00 7,049.00 -2,759.95 3,756.39 6,026,624.509 548,626.200 12.00D -831.64 9,325.00 95.32 324.26 7,D97.55 7,046.55 -2,739.39 3,742.38 6,028,644.981 548,612.069 12.ODD -809.32 9,350.00 94.69 321.31 7,095.37 7,044.37 -2,719.56 3,727.32 6,028,664.718 548,596.890 12.000 -786.45 9,375.00 94.05 318.37 7,093.47 7,042.47 -2,700.51 3,711.24 6,D28,683.667 548,580.702 12.000 -763.07 9,400.00 93.40 315.44 7,091.84 7,040.84 -2,682.30 3,694.20 6,028,701.776 548,563.551 12.000 -739.27 9,425.00 92.74 312.50 7,090.50 7,039.50 -2,664.97 3,676.24 6,028,718.996 548,545.484 12.000 -715.09 9,450.00 92.08 309.56 7,069.45 7,038.45 -2,648.57 3,657.40 6,028,735.279 548,526.550 12.000 -690.62 9,475.00 91.40 306.65 7,088.69 7,037.69 -2,633.15 3,637.74 6,028,750.580 548,506.801 12.000 -665.92 9,500.00 90.73 303.73 7,068.23 7,037.23 -2,618.74 3,617.31 6,028,764.858 548,486.291 12.000 -641.05 9,525.00 90.05 300.80 7,088.06 7,037.06 -2,605.40 3,596.18 6,028,778.073 648,465.D76 12.000 -616.08 9,550.00 89.38 297.88 7,088.18 7,037.18 -2,593.15 3,574.39 6,028,790.190 548,443.215 12.000 -591.08 9,575.00 88.70 294.96 7,088.60 7,037.60 -2,582.03 3,552.00 6,028,801,175 548,420.767 12.000 -666.12 9,588.94 88.33 293.33 7,088.96 7,037.96 -2,576.33 3,539.29 6,028,806.798 548,408.017 12.000 -552.25 9,600.00 88.33 292.00 7,089.29 7,038.29 -2,572.07 3,529.09 6,028,810.995 548,397.793 12.000 -541.27 9,625.00 88.33 289.00 7,090.02 7,039.02 -2,563.32 3,505.68 6,028,819.603 548,374.338 12.000 -516.60 9,650.00 88.34 286.00 7,090.74 7,039.74 -2,555.81 3,481.85 6,028,626.971 648,35D.466 12.000 -492.16 9,675.00 88.35 283.00 7,091.46 7,040.46 -2,549.55 3,457.66 6,028,833.079 648,326.239 12.000 -468.03 9,700.00 88.37 280.00 7,092.18 7,041.18 -2,544,57 3,433.18 6,028,837.911 548,301.727 12.000 -444.27 9,725.00 88.39 276.99 7,092.88 7,041.88 -2,540.88 3,408.46 6,028,841A52 548,276.994 12.000 -420.94 9,738.94 88.41 275.32 7,093.27 7,042.27 -2,539.39 3,394.61 6,028,842.863 548,263.131 12.000 -408.15 9,750.00 88.41 276.65 7,093.58 7,042.58 -2,538,23 3,383.61 6,028,843.949 548,252.132 12.000 -398.02 9,775.00 88.41 279.65 7,094.27 7,043.27 -2,534.69 3,358.88 6,028,847.341 548,227.378 12.000 -374.75 9,800.00 88.42 282.65 7,094.96 7,043.96 -2,529.86 3,334.36 6,028,852.025 548,202.836 12.000 -351.04 9,825.00 88.43 285.65 7,095.65 7,044.65 -2,523.75 3,310.13 6,028,857.987 548,178.573 12.000 -326.94 9,850.00 88.45 288.65 7,096.33 7,045.33 -2,516.38 3,286.26 6,028,865.211 548,154.654 12.000 -302.53 9,875.00 88.47 291.65 7,097.00 7,046.00 -2,507.77 3,262.80 6,028,873.678 548,131,147 12.000 -277.88 9,900.00 88.50 294.65 7,097.66 7,046.66 -2,497.95 3,239.82 6,028,883.363 548,108.115 12.000 -253.05 9,925.00 88.53 297.66 7,098.31 7,047.31 -2,486.93 3,217.39 6,028,894.242 548,085.621 12.000 -228.10 9,950.00 88.56 300.66 7,098.95 7,047.95 -2,474.76 3,195.57 6,028,906.283 548,063.727 12.000 -203.11 9,975.00 88.60 303.66 7,099.57 7,048.57 -2,461.46 3,174.41 6,028,919.454 548,042A93 12.000 -178.15 9,988.94 86.62 305.33 7,099.91 7,048.91 -2,453.57 3,162.93 6,028,927.277 548,030.960 12.000 -164.26 10,000.00 88.60 304.00 7,100.17 7,049.17 -2,447.28 3,153.83 6,028,933.509 548,021.831 12.000 -153.25 10,025.00 88.55 301,00 7,100.80 7,049.80 -2,433.85 3,132.76 6,028,946.808 548,000.677 12,000 -128.30 10,050.00 88.51 298.00 7,101.44 7,050,44 -2,421.54 3,111,01 6,028,958.981 547,978.856 12.000 -103.31 10,075.00 88.46 295.00 7,102.10 7,051.10 -2,410.39 3,088.65 6,028,969.995 547,956.429 12.000 -78.36 10,100.00 88.43 292.00 7,102.78 7,051.78 -2,400.43 3,065.73 6,028,979.820 547,933.456 12.000 -53.51 10,125.00 88AO 289.00 7,103.47 7,052.47 -2,391.68 3,042.33 6,028,988.428 547,910.001 12.000 -28.83 10,150.00 88.37 286.00 7,104.18 7,053.18 •2,384.17 3,018.50 6,028,995.797 547,886.127 12.000 -4.39 3/6/2023 5:18:35PM Page 5 COMPASS 5000.15 Build 91E H A LL I B U R T O N Standard Proposal Report Database: NORTH US + CANADA Local Co-ordinate Reference: Well Plan: MPL-12 Company: Hilcorp Alaska, LLC TVD Reference: MPL-12 RKS 51.00usft Project: Milne Point MD Reference: MPL-12 RKB 51.00usft Site: M Pt L Pad North Reference: True Well: Plan: MPL-12 Survey Calculation Method: Minimum Curvature Wellbore: Plan: MPL-121.1 OLS Vert Section Design: MPL-121.1 wp03a (•) (•) Planned Survey Measured Vertical Map Map DSPth Inclination Azimuth Depth TVDss +NIS +E1.W Northing Easting OLS Vert Section (usft) (•) (•) (usft) usft (usft) (usft) (usft) (usft) 7,053.89 10,175.00 88.34 283.00 7,104.89 7,053.89 -2,377.91 2,994.31 6,029,001.905 547,861.901 12.000 19.74 10,200.00 88.33 280.00 7,105.62 7,054.62 -2,372.93 2,969.82 6,029,006.737 547,837.389 12.000 43.50 10,213.94 88.32 278.32 7,106.03 7,055.03 -2,370.71 2,956.06 6,029,008.872 547,823.619 12.00D 56.57 10,225.00 88.25 279.65 7,106.36 7,055.36 -2,368.99 2,945.15 6,029,010.532 547,812.693 12.001) 66.92 10,250.00 88.10 282.65 7,107.16 7,056.16 -2,364.16 2,920.63 6,029,015.213 547,788.153 12.000 90.63 10,275.00 87.95 285.64 7,108.02 7,057.02 -2,358.05 2,896.41 6,029,021.171 547,763.894 12.000 114.71 10,300.00 87.81 288.64 7,108.95 7,057.95 -2,350.69 2,872.54 6,029,D28.389 547,739.983 12.OD0 139.11 10,325.00 87.67 291.64 7,109.93 7,058.93 -2,342.09 2,849.09 6,029,036.848 547,716.483 12.000 163.76 10,350.00 87.54 294.64 7,110.98 7,059.98 -2,332.27 2,826.12 6,029,046.524 547,693.461 12.000 188.58 10,375.00 87.42 297.64 7,1=8 7,061.08 -2,321.27 2,803.70 6,029,057.390 547,670.979 12.000 213.51 10,400.00 87.30 300.64 7,113.23 7,062.23 -2,309.11 2,781.89 6,D29,069.417 547,649.098 12.000 238.48 10,425.00 87.20 303.64 7,114.43 7,063.43 -2,295.82 2,760.75 6,029,082.572 547,627.879 12.000 263.42 10,450.00 87.10 306.65 7,115.67 7,064.67 -2,281.45 2,740.34 6,029,096.819 547,607.380 12.000 288.27 10,475.DD 87.00 309.65 7,116.96 7,065.96 -2,266.03 2,720.70 6,029,112.119 547,587.657 12,000 312.95 10,488.94 86.96 311.32 7,117.69 7,066.69 -2,256.99 2,710.12 6,029,121.093 547,577.015 12.DD0 326.62 10,500.00 86.89 310.00 7,118.29 7,067.29 -2,249.80 2,701.74 6,029,128.236 547,568.597 12.DD0 337.45 10,525.00 86.74 307.00 7,119.68 7,068.68 -2,234.26 2,682.21 6,029,143.652 547,548.971 12.000 362.1D 10,550.00 86.60 303.99 7,121.13 7,070.13 -2,219.77 2,661.89 6,029,158.017 547,528.569 12.000 386.92 10,575.00 86.47 300.99 7,122.64 7,071.64 -2,206.37 2,640.84 6,029,171.292 547,507.445 12.000 411.84 10,600.00 86.35 297,99 7,124.21 7,073.21 -2,194.09 2,619.13 6,029,183.441 547,485.657 12.000 436.79 10,625.00 86.24 294.98 7,125.83 7,074.83 -2,182.97 2,596.81) 6,029,194.429 547,463.266 12.000 461.70 10,650.00 86.13 291.98 7,127.49 7,076.49 -2,173.03 2,573.92 6,029,2D4.228 547,440.333 12.000 486.50 10,675.00 86.D4 288.97 7,129.20 7,078.20 -2,164.30 2,550.56 6,029,212.810 547,416.919 12.000 511.13 10,688.94 86.00 287.30 7,130.16 7,079.16 -2,159.97 2,537.34 6,029,217.058 547,403.678 12.000 524.76 10,700.00 85.98 288.63 7,130.94 7,079.94 -2,156.57 2,526.85 6,029,220.396 547,393.165 12.000 535.57 10,725.00 85.93 291.63 7,132.70 7,081.70 -2,147.99 2,503.44 6,029,228.835 547,369.704 12.000 560.17 10,750.00 85.90 294,64 7,134.48 7,083.48 -2,138.19 2,480.51 6,029,238.493 547,346.720 12.000 584.95 10,775.00 85.88 297.65 7,136.27 7,085.27 -2,127.21 2,458.13 6,029,249.343 547,324,274 12.000 609.84 10,800.00 85.88 300.66 7,138.07 7,087.07 -2,115.06 2,436.35 6,029,261.356 547,302.429 12.000 634.77 10,825.00 85.88 303.66 7,139.87 7,088.87 -2,101.79 2,415.25 6,029,274.498 547,281.245 12.000 659.68 10,850.00 85.89 306.67 7,141.66 7,090.66 -2,087.43 2,394.87 6,029,288.734 547,260.779 12.000 684.49 10,875.OD 85.92 309.68 7,143.44 7,092.44 -2,072.02 2,375.27 6,D29,304.025 547,241.087 12.DD0 709.14 10,888.94 85.94 311.36 7,144.43 7,093.43 -2,062.99 2,364.69 6,029,312.995 547,230.463 12.000 722,79 10,900.00 85.94 310.03 7,145.22 7,094.22 -2,055.79 2,356.33 6,029,320.135 547,222.057 12.000 733.61 10,925.00 85.95 307.02 7,146.99 7,095.99 -2,040.26 2,336.82 6,029,335.545 547,202.458 12.000 758.24 %950.00 85.97 304.01 7,148.75 7,097.75 -2,025.78 2,316.53 6,029,349.906 547,182.076 12.000 783.04 10,975.00 86.00 301.00 7,150.50 7,099.50 -2,012.38 2,295.50 6,029,363.179 547,160.969 12.000 807.94 11,000.00 86.05 298.00 7,152.23 7,101.23 -2,000.10 2,273.79 6,029,375.326 547,139.194 12.000 832.88 11,025.00 86.10 294.99 7,153.94 7,102.94 -1,988.97 2,251,47 6,029,386.315 547,116.809 12.000 857.78 11,050.00 86.17 291,96 7,155.63 7,1 D4.63 -1,979.03 2,228.60 6,029,396.116 547,093.878 12.000 882.58 11,075.00 86.24 288.98 7,157.28 7,106,28 -1,970.31 2,205.24 6,029,404.701 547,070.463 12.000 907.21 11,098.94 86.33 286.10 7,158.83 7,107.83 -1,963.11 2,182.46 6,029,411.763 547,047.643 12.000 930.58 11,100.00 66.33 286.23 7,158.90 7,107.90 -1,962.81 2,181.44 6,029,412.050 547,046.628 12.000 931.61 11,125.00 86.33 289.23 7,160.50 7,109.50 -1,955.22 2,157.68 6,029,419.504 547,022,824 12.000 956.03 11,150.00 86.35 292.24 7,162.10 7,111.10 -1,946.38 2,134.35 6,029,428.195 546,999.443 12.000 980.68 3/6/2023 5r18:35PM Page 6 COMPASS 5000.15 Build 91E H A L L I B U R T O N Standard Proposal Report Database: NORTH US + CANADA Local Co-ordinate Reference: Well Plan: MPL-12 Company: Hilaorp Alaska, LLC TVD Reference: MPL-12 RKB @ 51.00usft Project: Milne Point MD Reference: MPL-12 RKB @ 51.00usft Site: M Pt L Pad North Reference: True Well: Plan: MPL-12 Survey Calculation Method: Minimum Curvature Wellbore: Plan: MPL-121.1 DLS Vert Section Design: MPL-121-1 wp03a (0) V) Planned Survey Measured Vertical Map Map Depth Inclination Azimuth Depth TVDss +W -S +E/ -W Northing Easting DLS Vert Section (usft) (0) V) (usft) usft (usft) (us1t) (eft) (usft) 7,112.69 11,175.00 86.37 295.25 7,163.69 7,112.69 -1,936.34 2,111.52 6,029,438.100 546,976.550 12.000 1,005.50 11,200.00 86.41 29&25 7,165.26 7,114.26 -1,925.11 2,089.24 6,029,449.193 546,954.207 12.000 1,030.42 11,225.00 86.45 301.26 7,166.82 7,115.82 -1,912.73 2,067.58 6,029,461.443 546,932.476 12.000 1,055.37 11,250.00 86.51 304.26 7,161135 7,117.35 -1,899.23 2,046.60 6,029,474.816 546,911.415 12.000 1,080.28 11,275.00 86.57 307.27 7,169.86 7,118.86 -1,884.64 2,026.35 6,029,489.275 546,891.084 12.000 1,105.08 11,300.00 86.65 310.27 7,171.34 7,120.34 -1,869.02 2,006.90 6,029,504.782 546,871.536 12.000 1,129.71 11,303.94 86.66 310.75 7,171.57 7,120.57 -1,866.46 2,003.90 6,029,507.320 546,868,529 12.000 1,133.58 11,325.00 86.66 308.21 7,172.80 7,121.80 -1,853.10 1,987.68 6,029,520.585 646,852.226 12.000 1,154.28 11,350.00 86.66 305.21 7,174.25 7,123.25 -1,838.18 1,967.68 6,029,535.381 546,832.133 12.000 1,179.04 11,375.00 86.70 302.20 7,175.70 7,124.70 -1,824.33 1,946.92 6,029,549.103 546,811.292 12.000 1,203.93 11,400.00 86.73 299.20 7,177.13 7,126.13 -1,811.59 1,925.46 6,029,561.714 546,789.760 12.000 1,22&88 11,425.00 86.77 296.20 7,178.55 7,127.55 -1,799.99 1,903.36 6,029,573.179 646,767.595 12.000 1,253.82 11,450.00 86.81 293.19 7,179.95 7,128.95 -1,789,56 1,880.68 6,029,583.467 546,744.859 12.000 1,278.69 11,475.00 86.87 290.19 7,181.33 7,130.33 -1,780.34 1,657.49 6,029,592.550 546,721.614 12.000 1,303.42 11,500.00 86.94 287.18 7,182.68 7,131.68 -1,772.34 1,833.85 6,029,600.403 546,697.923 12.000 1,327.93 11,503.94 86.95 286.71 7,182.89 7,131.89 -1,771.19 1,830.08 6,029,601.527 546,694.151 12.000 1,331.77 11,525.00 86.95 289.24 7,184.01 7,133.01 -1,764.70 1,810.08 6,029,607.895 546,674.114 12.000 1,352.37 11,550.00 86.96 292.24 7,185.34 7,134.34 -1,755.86 1,786.74 6,029,616.593 545,650.719 12.000 1,377.04 11,575.00 86.98 295.25 7,186.66 7,135.66 -1,745.81 1,763.89 6,029,626.506 546,627.813 12.000 1,401.88 11,600.00 87,01 298.25 7,187.97 7,136.97 -1,734.58 1,741.60 6,029,637.606 546,605.456 12.000 1,426.81 11,625.00 87.05 301.26 7,189.26 7,138.26 -1,722.19 1,719.92 6,029,649.863 546,583.712 12.000 1,451.78 11,650.00 87.09 304.26 7,190.54 7,139.64 -1,708.68 1,698.93 6,029,663.243 546,562.638 12.000 1,47&70 11,675.00 87.14 307.26 7,191.80 7,140.80 -1,694.09 1,678.67 6,029,677.709 546,542.294 12.000 1,501.52 11,700.00 87.20 310.27 7,193.03 7,142.03 -1,676.46 1,659.21 6,029,693.222 546,522.735 12.000 1,526.16 11,703.94 87.21 310.74 7,193.22 7,142.22 -1,675.90 1,656.21 6,029,695.761 546,519.726 12.000 1,530.03 11,725.00 87.22 308.21 7,194.25 7,143.25 -1,662.53 1,639.98 6,029,709.032 546,503.413 12,000 1,550.74 11,750.00 67.23 305.21 7,195.46 7,144.46 -1,647.61 1,619.96 6,029,723.833 546,483.309 12.000 1,575.51 11,775.00 87,24 302.20 7,196.67 7,145.67 -1,633.75 1,599.19 6,029,737,561 546,462.457 12.000 1,600.41 11,800.00 87.27 299.20 7,197.86 7,146.86 -1,621.00 1,577.72 6,029,750.178 546,440.913 12.000 1,625.38 11,825.00 87.30 296.20 7,199.05 7,148.05 -1,609.40 1,555.61 6,029,761.649 546,418.738 12.000 1,650.33 11,850.00 87.34 293.19 7,200.22 7,149.22 -1,598.96 1,532.93 6,029,771.943 546,395.991 12.000 1,675.22 11,853.94 87.35 292.72 7,200.40 7,149.40 -1,597.43 1,529.30 6,029,773.456 546,392.358 12.000 1,679.13 Total Depth : 11853.94' MD, 7200.' TVD - 2 718" x 3 114" 34612023 5: 18.35PM Page 7 COMPASS 5000.15 Build 91E HALLIBURTON Database: NORTH US + CANADA Company: Hilcorp Alaska, LLC Project: Milne Point Site: M Pt L Pad Well: Plan: MPL-12 Wellbore: Plan: MPL-12L1 Design: MPL-121_1 wp03a Targets Target Name -hit/miss target "Shape Local Coordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Dip Angle Dip Dir. TVD +N/ -S PI (`) Wait) (usft) Standard Proposal Report Well Plan: MPL-12 MPL-12 RKB @ 51.00usft MPL-12 RKB @ 51.00usft True Minimum Curvature +F1 -W Northing Easting (usft) (usft) (usft) L-121_1 po"on 0.00 0.00 7,100.00 -1,413.91 1,536.95 - plan misses target center by 209.33usft at It 853.94usft MD (7200.40 TVD, -1597.43 N, 1529.30 E) - Polygon 8,755.00 6,941.39 7"TOW 11,853.94 Point 1 7,100.00 0.00 0.00 Point 7,100.00 -224.55 -79.06 Point 3 7,100.00 -556.16 512.60 Point 7,100.00 -997.12 1,326.44 Point 7,100.00 -1,261.71 1,915.79 Point6 7,100.00 -1,504.67 2,402.90 Point7 7,100.00 "1,249.91 2.446.94 Point 8 7,100.00 -567.47 1,061.00 MPL-121_1 wp03 tgtl 0.00 0.00 7,101.00 -2,470.44 3,095.86 - plan misses target center by 50.18usft at 10039.10usft MD (7101.16 TVD, -2426.77 N, 3120.57 E) - Point MPL-12L1 wp03 tgt2 0.00 0.00 7,201.OD -1,605.93 1,536.89 - plan misses target center by 4.92usft at 11843.53usft MD (7199.92 TVD, -1601.55 N, 1538.85 E) - Point L.1 2A hardline 0.00 0.00 7,100.00 -3,282.38 4,064.07 " pian misses target center by 320.66usft at 8930.DDusft MO (7081.65 TVD, -3096.24 N, 3803.61 E) - Polygon Point 1 7,100.00 0.00 0.00 Point 7,100.00 730.97 184.43 Casing Points Measured Vertical Depth Depth (usft) (usft) 8,755.00 6,941.39 7"TOW 11,853.94 7,200.40 2 7/8" x 3 1/4" Plan Annotations Name 6,029,957.000 546,39&900 6,029,957.00 6,029,732.00 6,029,404.00 6,028,968.00 6,028,687.00 6,028,467.00 6,028,722.00 6,029,396.00 6,028,910.000 546,398.90 546,321.20 546,914.80 547,731.20 548,322.20 548,810.60 648,853.10 547,463.20 547,964.000 6,029,765.000 546,400.000 6,028,104.000 548,937.000 6,028,104.00 548,937.00 6,028,836.00 549,117.00 Casing Hole Diameter Diameter (") ("I 7 8.1/2 2-7/8 3.1/4 Measured Vertical Local Coordinates Depth Depth +W.S +E/ -11V (usft) (usft) (usft) (usft) Comment 8,755.00 6,941.39 -3,107.33 3,716.25 KOP : Start Dir 9°1100' : 8755' MD, 6941.39'TVD : 180° RT TF 8,785.00 6,964.76 -3,117.91 3,731.79 Start Dir 4001100': 8785'MD, 6964.767VD 9,088.94 7,128.00 -2,954.70 3,827.90 Start Dir 120/100': 9088.94' MD, 71287VD 11,853.94 7,200.40 -1,597A3 1,529.30 Total Depth : 11853.94' MD, 7200.4' TVD 382023 5:18:35PM Page 8 COMPASS 5000.15 Build 91E I N 0 4 0 0 N C N A ■_ A c M c N �r eek b N LC J 5 p N O N M W z a UJ S Z ti - � J O LJ `V 3C0 G� � w •� LL c� a N f L 2oc LL N W C O 41 R 2 N Oai i R /� N�«va N N C. � M a �o.N- o::� .. Q —Ho CL �.+ r r 3 L �� N 0 f b J m N b C oaaaN J lut LLb_s d NN o a N« 4 0 ^� CL_W EL ��� Q _ � � aa�� O Uz3CNNU'>4141 a •� " � 3 Q o O n �y V% N N N N. N N N N N " N N N N N N N N. N N N N N 10 N N N" N N N" N 0 " N 0 N FM 0- IL aaaaa a a a a c 0 ac m E o` `0 0 0` `o `o `a o` `o `o o `o `o R] J U U U ZS Yo FS V u u u {p m E LL Il IL LL IL IL li IL IL IL IL 41L IL E `" `" `m `d E "` " " d " ] d d d d d d d d d d d= d d N U U U U U U U U U U U W U U o VQ C. f0 N M m Q OP% r r Q o 0 o r Q M M O0 Q O Q M J m d IL U .o No 00 N FNM N N M M N Q y ] N O O O O O N M R M N OI A 6 y 1n Q M Q N N� Q N N M M m M In M In M N M p M M 10 m d Q ] r OJ •A N •n In OJ O O 4] O] O] p2 V C N mr mr r Q O r Q O N m M Cn [O V O M N M N d ,., N 6i mM cl N 6 r" O N S l0 N 1n 1n m M N n n W d] N M Cl[ Cq N M M � M N M � N y 0 o Q Q VQ c Q Q Q o 0 0 o N o � o d m m m m m mmmo 0 ooQ,o {h c � � — n ri ri ri ri N N �d N N cd ri ri �i �i N N N 1p 1ll N vi r vi lA Y] N N O O @ Q N N N N N N N N N r r r n Q O CL dd] O — ^"' —— -m ro ao�aim 3 N @ a� m v m g o v o uMi m a`do C4 N d `m u" a' Eu.-, c,X r a ai Ni .o N r^ of of m w cd YNof T C M N E Is N N r N r N N n Q Q m C N ] N M tV lV m N t'1 t'1 N fel Nf N t7 J a i G CL d c d W Q Q Q Q Q Q Q Q c o 0 o N o M t �! ] C M t7 t7 M M M M N N N N r .A N mf an d N m m m N m N co r r r r Q o _ 'd .6 .6 w eo ni m d �IL d Z 2 � a a = IL m m w c u N iL( m c N Q C N a m Q 4 q q g v S F = � m � 9 N 4 n a a a N N a m ni a m� a `L �' ~ G '� 9 d E a a a a R R a a {L i N 0- 0 4 9 9 4 9 2'-C OOdc 1mA Rd arL aaOI m a JQ Nw L C L G Ja _•t�Vq 3'- (p 'a' N N N m IT a"m6 E a 4 4 4 4 4 4 4 4 m y;, `rcrc o v,U aaaaa ����� aaaaa aaa" C Nd c c 2 222 2 222a = Q p m m K U , wo N M H mN N r N c N co ( ] ) � ƒ ) � [ § � 3 � IL f}. � §!f t2E t }kk CL 0 § mc -c |ret\! O CL 22]{ƒ] ■ !!!®|| ;e!!!■ 2 0 ■!2§(! -di!w jj co ( m s N s �a iQQ 0 N � u .Y CC y�j Marc€ 5 (5 f m 4x�g� m I I: N �r� 3 L3 ✓3� vw C0 � � N vi IM as d N m s C C J m=m s!j cN38A a $fro a ism E�8 hi jm S r pyn� a Q G�np gg � O �nS �Si iO m s N iQQ 0 � ¢ .Y CC y�j Marc€ 5 (5 f m 4x�g� m I I: 3 8 IM as d N m s C C J m=m s!j cN38A a $fro $ m E�8 m s N 0 � ¢ m CC o I o f m 0 C U m I I: m s N Well CDR2-AC BOP Schematic Date Quick Test Sub to Otis Top of 7" Otis O.Oft ._._._._.— _---- _._.—._._ CDR2 Rigs Drip Pan Distances from top of riser Fill Line from Excluding quick-test sub Normally Disconn\Cte< ��- 3" HP hose to Micromotion Top of Annular 2.75ft Hyddl 7 1118" CL Annular 3.40ft Annular Bottom Annular 4.75 ft — . '�� �— 3" LP hose open ended to Flowline F 1111astas CL BlindlShears 6.09 ft CL 2.0" Pipe I Slips 6.95 ft B3 B4 4Line B2 CL 2.318" Pipe I Slip CL 2.0" Pipe I Slips 10A0 ft TV1 TV2 Flow Tee Master LDS I4r3.1 Ground Level /TI �T2 31r— -E.LS Master IA OA TRANSMITTAL LETTER CHECKLIST WELL NAME: MPU 1-121 1 PTD: X Development _ Service _ Exploratory _ Stratigraphic Test _ Non -Conventional FIELD: Molne '. i • • ..., • 01 Check Box for Appropriate Letter / Paragraphs to be Included in Transmittal Letter CHECK OPTIONS TEXT FOR APPROVAL LETTER MULTI The permit is for a new wellbore segment of existing well Permit LATERAL Number 193-011 API Number 50- 029-22334-00-00 X (If last two digits Production from or injection into this wellbore must be reported under in API number are the original API Number stated above. between 60-69 The permit is approved subject to full compliance with 20 AAC 25.055. Spacing Approval to produce or inject is contingent upon issuance of a Exception conservation order approving a spacing exception. The Operator assumes the liability of any protest to the spacing exception that may occur. All dry ditch sample sets submitted to the AOGCC must be in no greater Dry Ditch Sample than 30 -foot sample intervals from below the permafrost or from where samples are first caught and 10 -foot sample intervals through target zones. Please note the following special condition of this permit: Production or Non- production testing of coal bed methane is not allowed for this well until Conventional after the Operator has designed and implemented a water -well testing Well program to provide baseline data on water quality and quantity. The Operator must contact the AOGCC to obtain advance approval of such a water -well testing prop ram. Regulation 20 AAC 25.071(a) authorizes the AOGCC to specify types of well logs to be run. In addition to the well logging program proposed by the Operator in the attached application, the following well logs are also required for this well: X Well Logging Requirements Per Statute AS 31.05.030(d)(2)(B) and Regulation 20 AAC 25.071, composite curves for all well logs run must be submitted to the AOGCC within 90 days after completion, suspension, or abandonment of this well, or within 90 days of acquisition of the data whichever occurs first. Revised 7/2022 a ma o N ' mm gg v w •�e�2'er •' i 9 O sH � q O 6 6 6 Q o 6 .. m$a . +}• :g 0 0 o m m v 0 a 9 'J S A A R J5 °O J'J'g ',AS fpm g 71 JJ..SJ rvm�JJSp'� ,�m •� • ' >>JJ � rt.HSJDH v `d $ � 'd d : U F• Sr `d � D Mss � � Y :� • Z' m� m ma m m� a m m m m m u��•T,� m m��� m� m� `a a���� �.%��� U LL d S „ g z '=e �o m5o1i 5 .�.�' ,B y`pp g e`d �' :F e'0w •.gym $ @L R' 3 a �'a c m77 mgei3 �i $d 2I M"M2 gggww z LA8� 44�ta 3a" R qy3 H m vis $m.� N 8 j9 6 � � � �O: M � � m m c � � S � n � � $ S a o � � 0 4 � io � °�• m q � 96 .4 SS$�� � $ � LL pp33 q m F F F N gggi y �$r gg o 44 k� ���4 d ga Cmo'W a c°f, v�c�i, chi, u�, c% � r.4pqq •.r4� g i4 4$ 8, 414p d4 dm�D. g vk N N M Y w 0 A p� p� {y 0 W O N M Y w Id N N N R N 9 A AIR A m !1 m Lu C m D o DQ D W a � z N C4f E CAUTION: External sender. DO NOT open links or attachments from UNKNOWN senders. CAUTION: This email originated from outside the State of Alaska mail system. Do not click links or open attachments unless you recognize the sender and know the content is safe. From:Sean McLaughlin To:Guhl, Meredith D (OGC) Cc:Davies, Stephen F (OGC) Subject:RE: [EXTERNAL] MPU L-12L1 (PTD #223-019) Question Date:Friday, March 10, 2023 9:55:28 AM Hi Meredith, The MPL-12 perforations will not be isolated. Regards, sean From: Guhl, Meredith D (OGC) <meredith.guhl@alaska.gov> Sent: Friday, March 10, 2023 9:41 AM To: Sean McLaughlin <sean.mclaughlin@hilcorp.com> Cc: Davies, Stephen F (OGC) <steve.davies@alaska.gov> Subject: [EXTERNAL] MPU L-12L1 (PTD #223-019) Question Hello Sean, Will the existing perfs in MPU L-12 be isolated, or will they remain open to flow? Thank you, Meredith Meredith Guhl (she/her) Petroleum Geology Assistant Alaska Oil and Gas Conservation Commission 333 W. 7th Ave, Anchorage, AK 99501 meredith.guhl@alaska.gov Direct: (907) 793-1235 CONFIDENTIALITY NOTICE: This e-mail message, including any attachments, contains information from the Alaska Oil and Gas Conservation Commission (AOGCC), State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged information. The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an unintended recipient of this e-mail, please delete it, without first saving or forwarding it, and, so that the AOGCC is aware of the mistake in sending it to you, contact Meredith Guhl at 907-793-1235 or meredith.guhl@alaska.gov. The information contained in this email message is confidential and may be legally privileged and is intended only for the use of theindividual or entity named above. If you are not an intended recipient or if you have received this message in error, you are herebynotified that any dissemination, distribution, or copy of this email is strictly prohibited. If you have received this email in error, pleaseimmediately notify us by return email or telephone if the sender's phone number is listed above, then promptly and permanently deletethis message. While all reasonable care has been taken to avoid the transmission of viruses, it is the responsibility of the recipient to ensure that the onward transmission, opening, or use of this message and any attachments will not adversely affect its systems or data. No responsibilityis accepted by the company in this regard and the recipient should carry out such virus and other checks as it considers appropriate.