Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAbout184-239 TT RR AA NN SS MM II TT TT AA LL
FROM::Sandra D. Lemke, ATO-704 TO:: Meredith Guhl
ConocoPhillips Alaska, Inc. AOGCC
P.O. Box 100360 330 W. 7
th Ave., Suite 100
Anchorage AK 99510-0360 Anchorage, Alaska 99501
RE: Schlumberger Wireline Backlog – Kuparuk River Unit
DATE: 12/19/2023
Transmitted:
North Slope, Kuparuk River Unit
Via hard drive data drop
2V-04 50-029-21041-00
183165_2V-04_LDL_31May2023
2V-11 50-029-21311-00
185049_2V-11_Patch_13Jul2022
185049_2V-11_PPROF_28Jun2023
2W-14 50-029-21253-00
184237_2W-14_Patch_21Jun22
2W-16 50-029-21255-00
184239_2W-16_IPROF_12May2023
2X-13 50-029-21197-00
184174_2X-13_PPROF_04Jul2023
2X-18 50-029-22608-00
195160_2X-18_Patch_02Jan2023
3A-15 50-029-21491-00
185283_3A-15_IPROF_17Jan2023
3B-12 50-029-21370-00
185116_3B-12_WFL_30Mar2023
3B-13 50-029-21286-00
185023_3B-13_RCT_02Oct2022
3B-14 50-029-21287-00
185024_3B-14_SCMT_23Jun22
3G-02 50-103-20146-00
190137_3G-02_GR-CCL_02Feb2022
3G-08 50-103-20128-00
190065_3G-08_RPB_25Mar2023
8 of 12
Transmittall instructions: please promptly sign, scan, and e-mail to Sandra.D.Lemke@conocophillips.com
Receipt: Date:
Alaska/IT-Support Services GGRE |ConocoPhillips Alaska |Office: 907.265.6947; Mobile 907.440.4512
T38383
T38384
T38385
T38386
T38387
T38388
T38389
T38390
T38391
T38392
T38393
T38394
2/29/2024
2W-16 50-029-21255-00
184239_2W-16_IPROF_12May2023
Kayla
Junke
Digitally signed by
Kayla Junke
Date: 2024.02.29
12:01:58 -09'00'
MEMORANDUM State of Alaska
Alaska Oil and Gas Conservation Commission
DATE:Thursday, June 1, 2023
SUBJECT:Mechanical Integrity Tests
TO:
FROM:Sully Sullivan
P.I. Supervisor
Petroleum Inspector
NON-CONFIDENTIAL
ConocoPhillips Alaska, Inc.
2W-16
KUPARUK RIV UNIT 2W-16
Jim Regg
InspectorSrc:
Reviewed By:
P.I. Suprv
Comm ________
JBR 06/01/2023
2W-16
50-029-21255-00-00
184-239-0
W
SPT
5743
1842390 1500
2225 2225 2225 2225
80 320 320 320
4YRTST P
Sully Sullivan
5/2/2023
pt to 3k for 500 psi dp. Pt with 90 deg diesel
30 MinPretestInitial15 Min
Well Name
Type Test
Notes:
Interval P/F
Well
Permit Number:
Type Inj TVD
PTD Test psi
API Well Number Inspector Name:KUPARUK RIV UNIT 2W-16
Inspection Date:
Tubing
OA
Packer Depth
225 3000 2890 2865IA
45 Min 60 Min
Rel Insp Num:
Insp Num:mitSTS230503082810
BBL Pumped:2 BBL Returned:2
Thursday, June 1, 2023 Page 1 of 1
9
9
9
9
9
9 9 9 9
99
9
9
James B. Regg Digitally signed by James B. Regg
Date: 2023.06.01 16:02:55 -08'00'
1. Operations Susp Well Insp Plug Perforations Fracture Stimulate Pull Tubing Operations shutdown
Performed: Install Whipstock Perforate Other Stimulate Alter Casing Change Approved Program
Mod Artificial Lift Perforate New Pool Repair Well Coiled Tubing Ops Other: Tubing Patch
Development Exploratory
Stratigraphic Service 6. API Number:
7. Property Designation (Lease Number): 8. Well Name and Number:
9. Logs (List logs and submit electronic data per 20AAC25.071): 10. Field/Pool(s):
11. Present Well Condition Summary:
Total Depth measured 7122'feet None feet
true vertical 6314'feet None feet
Effective Depth measured 6822'feet 6443', 6473', 6491',
6700'
feet
true vertical 6056'feet 5745', 5769', 5784',
5954'
feet
Perforation depth Measured depth
True Vertical depth
Tubing (size, grade, measured and true vertical depth) 3-1/2" J-55 6721' MD 5971' TVD
Packers and SSSV (type, measured and true vertical depth) 6443' MD
6473' MD
6491' MD
6700' MD
1887' MD
5745' TVD
5769' TVD
5784' TVD
5954' TVD
1887' TVD
12. Stimulation or cement squeeze summary:
Intervals treated (measured):
Treatment descriptions including volumes used and final pressure: N/A
13a.
Prior to well operation:
Subsequent to operation:
13b. Pools active after work: Kuparuk River Oil Pool
15. Well Class after work:
Daily Report of Well Operations Exploratory Development Service Stratigraphic
Copies of Logs and Surveys Run 16. Well Status after work: Oil Gas WDSPL
Electronic Fracture Stimulation Data GSTOR GINJ SUSP SPLUG
Sundry Number or N/A if C.O. Exempt:
Authorized Name and
Digital Signature with Date: Contact Name:
Contact Email:
Authorized Title: Contact Phone:
3160' 3068'
Burst Collapse
Production
Liner
7055'
Casing
6282' 7084'
3130'
115'Conductor
Surface
Intermediate
16"
9-5/8"
84'
measured
TVD
7"
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
REPORT OF SUNDRY WELL OPERATIONS
184-239
50-029-21255-0-00
P.O. Box 100360
Anchorage, AK 99510
3. Address:
ConocoPhillips Alaska, Inc.
N/A
5. Permit to Drill Number:2. Operator Name 4. Well Class Before Work:
ADL0025642
Kuparuk River Field/ Kuparuk River Oil Pool
KRU 2W-16
Plugs
Junk measured
Length
measured
true vertical
Packer
Representative Daily Average Production or Injection Data
Casing Pressure Tubing Pressure
14. Attachments (required per 20 AAC 25.070, 25.071, & 25.283)
~
Gas-Mcf
MD
~
Size
115'
~ ~~
INJECTOR ~~
~
322-658
Sr Pet Eng: Sr Pet Geo: Sr Res Eng:
WINJ WAG
~
Water-BblOil-Bbl
17. I hereby certify that the foregoing is true and correct to the best of my knowledge.
N/A
Packer: Baker FHL Rtvbl Packer
Packer: PIIP Patch Packer
Packer: PIIP Patch Packer
Packer: Baker FB-1 Perm Packer
SSSV: Baker FVL Sfty Vlv (locked out)
Kathrine O'Connor
katherine.oconnor@conocophillips.com
(907) 659-7224Senior Well Interventions Engineer
6600-6654', 6663-6668', 6780-6786', 6790-6832' feet
5872-5916', 5924-5928', 6021-6026', 6029-6064' feet
Form 10-404 Revised 10/2022 Due Within 30 days of Operations Submit in PDF format to aogcc.permitting@alaska.gov
By Samantha Carlisle at 3:36 pm, Jan 12, 2023
Digitally signed by Katherine O'Connor
DN: CN=Katherine O'Connor, O=
ConocoPhillips, OU=Wells Group, E=
katherine.oconnor@conocophillips.com, C=
US
Reason: I am the author of this document
Location:
Date: 2023.01.12 13:53:31-09'00'
Foxit PDF Editor Version: 12.0.1
Katherine
O'Connor
P.O. BOX 100360
ANCHORAGE, ALASKA 99510-0360
January 12, 2023
Commissioner Jessie Chmielowski
Alaska Oil and Gas Conservation Commission
333 West 7th Avenue, Suite 100
Anchorage, AK 99501
Commissioner Chmielowski,
Enclosed please find the 10-404 from ConocoPhillips Alaska, Inc. for the retrievable tubing
patch set across the C sand selective in order to shut off the C sand in injector KRU 2W-16 (PTD
184-239).
Please contact Katherine OConnor at 659-3718 if you have any questions.
Sincerely,
Katherine OConnor
CPF2 Interventions Engineer
ConocoPhillips Alaska, Inc.
Digitally signed by Katherine O'Connor
DN: CN=Katherine O'Connor, O=
ConocoPhillips, OU=Wells Group, E=
katherine.oconnor@conocophillips.com,
C=US
Reason: I am the author of this
document
Location:
Date: 2023.01.12 13:53:08-09'00'
Foxit PDF Editor Version: 12.0.1
Katherine
O'Connor
DTTMSTART JOBTYP SUMMARYOPS
10/28/2022 OPTIMIZE WELL RAN 1.5'' POCKET POKER TO GLM#12 @ 6480' RKB (RECOVERED MISSING 6'' OF HFCV). SET 1.5'' DMY
@ 6480' RKB. UNABLE TO OBTAIN TBG TEST. RAN HOLEFINDER TO FIND GLM #12 @ 6480' RKB
LEAKING. PULLED DMY @ 6480' RKB & SET EXTENDED PKG DMY. STILL UNABLE TO TEST TBG.
PULLED 2.75'' D-CSV @ 6714' RKB. RIG DOWN FOR PLAN FORWARD.
11/26/2022 OPTIMIZE WELL SET 2.75'' CSV @ 6714'RKB. READY FOR ELINE C SAND LDL.
11/30/2022 OPTIMIZE WELL LOGGED LDL STRING FROM 6705' RKB TO SURFACE (1-1.5 BPM). IDENTIFIED ANOMALY IN MADREL
@ 6480'. LOGGED UP/DOWN PASSES ACROSS AND STATIONS ABOVE AND BELOW. NO OTHER
ANOMALIES OBSERVED IN THE WELL, JOB IS READY FOR SL.
12/3/2022 OPTIMIZE WELL PULLED CSV @ 6714' RKB, B&F 6450' RKB TO 6550' RKB. DRIFT W/ DUMMY PATCH(2.73" X 18' ) TO
6550' RKB, NO OBSTRUCTIONS.E-LINE UP NEXT TO SET LOWER PACKER.
12/5/2022 OPTIMIZE WELL SET 2.725" LOWER P2P PACKER @ 6493.7' MOE, CCL TO MOE = 12.0', CCL STOP = 6481.7'. JOB IS
READY FOR SL.
SERIAL NUMBER: CPP35169
12/16/2022 OPTIMIZE WELL SPOT EQUIPMENT & UNABLE TO PICK UP PCE DUE TO CRANE MALFUNCTIONING. IN PROGRESS.
12/17/2022 OPTIMIZE WELL (UTILIZING 1.69'' DPU) SET 3.5'' QUADCO (2.725") P2P, SPACER PIPE, ANCHOR LATCH ASSEMBLY @
6473' RKB (MID ELEMENT @ 6475' RKB / S#CPP35344 / S#CPAL35186 / OAL 20'); SET 3.5'' TTS TEST
TOOL @ 6473' RKB & LRS PERFORM MITT TO 2500 (PASS), PULLED TEST TOOL. JOB COMPLETE.
12/23/2022 ACQUIRE DATA DRIFT TBG W/ 2.74" GAUGE RING TO TOP OF PATCH @ 6473' RKB. MEASURE A SAND ONLY SBHP @
6790' RKB (3219 PSI) JOB COMPLETE.
2W-16 Patch
Summary of Operations
Last Tag
Annotation Depth (ftKB) Wellbore End Date Last Mod By
Last Tag: RKB 6,822.0 2W-16 10/27/2022 fergusp
Last Rev Reason
Annotation Wellbore End Date Last Mod By
Rev Reason: Set Patch 2W-16 12/17/2022 zembaej
Notes: General & Safety
Annotation End Date Last Mod By
NOTE: 10/11/2020 pproven
General Notes: Last 3 entries
Com Date Last Mod By
GLM #14 (6682'') RKFS-CV Installed 11/27/1997 Admin
Casing Strings
Csg Des OD (in) ID (in) Top (ftKB)
Set Depth
(ftKB)
Set Depth
(TVD) (ftKB) Wt/Len (lb/ft) Grade Top Thread
CONDUCTOR 16 15.06 31.0 115.0 115.0 62.50 H-40 WELDED
SURFACE 9 5/8 8.92 30.2 3,159.8 3,068.1 36.00 J-55 BUTT
PRODUCTION 7 6.28 28.9 7,084.4 6,282.5 26.00 J-55 BUTT
Tubing Strings: string max indicates LONGEST segment of string
Top (ftKB)
23.6
Set Depth
6,720.8
Set Depth
5,971.4
String Ma
3 1/2
Tubing Description
TUBING
Wt (lb/ft)
9.30
Grade
J-55
Top Connection
EUE 8RD
ID (in)
2.99
Completion Details: excludes tubing, pup, space out, thread, RKB...
Top (ftKB)
Top (TVD)
(ftKB)
Top Incl
(°) Item Des
OD
Nominal
(in)Com Make Model
Nominal
ID (in)
23.6 23.6 0.05 HANGER 8.000 FMC GEN III TUBING HANGER 3.500
1,887.0 1,887.0 0.86 SAFETY VLV 5.937 BAKER FVL SAFETY VALVE,
LOCKED OUT
2.810
1,942.0 1,942.0 2.32 GAS LIFT 5.390 CAMCO KBUG 2.920
3,024.9 2,956.6 32.87 GAS LIFT 5.390 CAMCO KBUG 2.920
3,714.8 3,524.7 34.89 GAS LIFT 5.390 CAMCO KBUG 2.920
4,095.0 3,835.5 35.30 GAS LIFT 5.390 CAMCO KBUG 2.937
4,442.4 4,119.6 35.17 GAS LIFT 5.390 CAMCO KBUG 2.920
4,816.4 4,424.4 35.50 GAS LIFT 5.390 CAMCO KBUG 2.920
5,195.2 4,733.1 35.26 GAS LIFT 5.390 CAMCO KBUG 2.920
5,566.4 5,035.9 35.60 GAS LIFT 5.390 CAMCO KBUG 2.920
5,939.0 5,336.9 36.40 GAS LIFT 5.390 CAMCO KBUG 2.920
6,286.5 5,617.4 35.83 GAS LIFT 5.390 CAMCO KBUG 2.920
6,385.4 5,697.7 35.71 GAS LIFT 5.960 MERLA TPDX 2.875
6,430.0 5,733.9 35.66 PBR 5.000 BAKER PBR 3.000
6,443.4 5,744.9 35.64 PACKER 5.968 BAKER FHL RETRIEVABLE
PACKER
2.947
6,590.9 5,864.9 35.32 BLAST RING 4.500 BLAST RINGS (2) 2.992
6,664.7 5,925.3 34.89 BLAST JT 4.500 BAKER BLAST JOINT 2.992
6,699.4 5,953.8 34.67 LOCATOR 4.500 BAKER SBR LOCATOR 3.000
6,700.2 5,954.4 34.67 PACKER 5.875 BAKER FB-1 PERMANENT
PACKER
4.000
6,703.5 5,957.2 34.60 SBE 5.000 BAKER SEAL BORE EXTENSION 4.000
6,714.5 5,966.2 34.40 NIPPLE 4.540 CAMCO D NIPPLE NO GO 2.750
6,720.0 5,970.7 34.29 WLEG 4.500 BAKER WIRELINE RE-ENTRY
GUIDE
3.015
Other In Hole (Wireline retrievable plugs, valves, pumps, fish, etc.)
Top (ftKB)
Top (TVD)
(ftKB)Top Incl (°)Des Com Make Model SN Run Date ID (in)
6,473.2 5,769.1 35.60 PACKER -
PATCH - UPR
2.725" P2P UPPER PACKER
(MID ELEMENT @ 6,475.6),
SPACER PIPE, & ANCHOR
LATCH (20' OAL)
CPP3
5344
12/17/2022 1.625
6,477.2 5,772.3 35.60 ANCHOR
LATCH ON
SPACER
PIPE
SPACER PIPE & ANCHOR
LATCH CONNECTED TO
UPPER PACKER
CPAL
35186
12/17/2022 1.600
6,480.0 5,774.6 35.60 LEAK -
TUBING
TUBING LEAK IDENTIFIED @
6480' RKB (LDL 11/30/22)
11/30/2022 2.992
6,491.3 5,783.7 35.58 PACKER -
PATCH - LWR
2.725" P2P LOWER PACKER
SET AT 6493.7' MOE, OAL =
4.01'
CPP3
5169
12/5/2022 1.625
Mandrel Inserts : excludes pulled inserts
Top (ftKB)
Top (TVD)
(ftKB)
Top
Incl (°)
St
ati
on
No
/S Serv
Valve
Type
Latch
Type
OD
(in)
TRO Run
(psi) Run Date Com Make Model
Port
Size (in)
1,942.0 1,942.0 2.32 1 GAS LIFT DMY BK-2 1 0.0 2/24/1985 0.000
3,024.9 2,956.6 32.87 2 GAS LIFT DMY BK-2 1 0.0 2/24/1985 0.000
3,714.8 3,524.7 34.89 3 GAS LIFT DMY BK-2 1 0.0 2/24/1985 0.000
4,095.0 3,835.5 35.30 4 GAS LIFT DMY BK-2 1 0.0 2/24/1985 0.000
4,442.4 4,119.6 35.17 5 GAS LIFT DMY BK-2 1 0.0 2/24/1985 0.000
4,816.4 4,424.4 35.50 6 GAS LIFT DMY BK-2 1 0.0 2/24/1985 0.000
5,195.2 4,733.1 35.26 7 GAS LIFT DMY BK-2 1 0.0 2/24/1985 0.000
5,566.4 5,035.9 35.60 8 GAS LIFT DMY BK-2 1 0.0 2/24/1985 0.000
5,939.0 5,336.9 36.40 9 GAS LIFT DMY BK-2 1 0.0 2/24/1985 0.000
6,286.5 5,617.4 35.83 1
0
GAS LIFT DMY BK-2 1 0.0 2/24/1985 0.000
6,385.4 5,697.7 35.71 1
1
GAS LIFT DMY RM 1 1/2 0.0 4/18/2022 0.000
2W-16, 1/10/2023 2:32:42 PM
Vertical schematic (actual)
PRODUCTION; 28.9-7,084.4
IPERF; 6,790.0-6,832.0
IPERF; 6,780.0-6,786.0
PACKER; 6,700.2
INJECTION; 6,682.0
IPERF; 6,663.0-6,668.0
IPERF; 6,600.0-6,654.0
INJECTION; 6,550.1
PACKER - PATCH - LWR;
6,491.2
INJECTION; 6,480.0
ANCHOR LATCH ON SPACER
PIPE; 6,477.2
LEAK - TUBING; 6,480.0
PACKER - PATCH - UPR;
6,473.2
PACKER; 6,443.4
GAS LIFT; 6,385.4
GAS LIFT; 6,286.5
GAS LIFT; 5,939.0
GAS LIFT; 5,566.4
GAS LIFT; 5,195.2
GAS LIFT; 4,816.4
GAS LIFT; 4,442.4
GAS LIFT; 4,095.0
GAS LIFT; 3,714.8
SURFACE; 30.2-3,159.8
GAS LIFT; 3,024.9
GAS LIFT; 1,942.0
SAFETY VLV; 1,887.0
CONDUCTOR; 31.0-115.0
KUP INJ
KB-Grd (ft)
34.60
RR Date
1/30/1985
Other Elev
2W-16
...
TD
Act Btm (ftKB)
7,122.0
Well Attributes
Field Name
KUPARUK RIVER UNIT
Wellbore API/UWI
500292125500
Wellbore Status
INJ
Max Angle & MD
Incl (°)
36.48
MD (ftKB)
5,900.00
WELLNAME WELLBORE2W-16
Annotation
Last WO:
End DateH2S (ppm) DateComment
SSSV: LOCKED OUT
Mandrel Inserts : excludes pulled inserts
Top (ftKB)
Top (TVD)
(ftKB)
Top
Incl (°)
St
ati
on
No
/S Serv
Valve
Type
Latch
Type
OD
(in)
TRO Run
(psi) Run Date Com Make Model
Port
Size (in)
6,480.0 5,774.6 35.60 1
2
INJ DMY RM 1 1/2 0.0 10/28/2022 EXT
Packi
ng
0.000
6,550.1 5,831.6 35.43 1
3
INJ DMY RM 1 1/2 0.0 7/28/2013 0.000
6,682.0 5,939.5 34.78 1
4
INJ DMY RM 1 1/2 0.0 1/11/2000 0.000
Perforations & Slots
Top (ftKB) Btm (ftKB)
Top (TVD)
(ftKB)
Btm (TVD)
(ftKB) Linked Zone Date
Shot
Dens
(shots/ft)Type Com
6,600.0 6,654.0 5,872.3 5,916.5 C-4, C-3, C-1,
UNIT B, 2W-16
2/24/1985 12.0 IPERF 120° phasing; 5" DA HD
6,663.0 6,668.0 5,923.9 5,928.0 UNIT B, 2W-16 2/24/1985 12.0 IPERF 120° phasing; 5" DA HD
6,780.0 6,786.0 6,020.6 6,025.7 A-4, 2W-16 2/24/1985 4.0 IPERF 120° phasing; 4" DA JJ II
6,790.0 6,832.0 6,029.0 6,064.4 A-3, 2W-16 2/24/1985 4.0 IPERF 120° phasing; 4" DA JJ II
2W-16, 1/10/2023 2:32:43 PM
Vertical schematic (actual)
PRODUCTION; 28.9-7,084.4
IPERF; 6,790.0-6,832.0
IPERF; 6,780.0-6,786.0
PACKER; 6,700.2
INJECTION; 6,682.0
IPERF; 6,663.0-6,668.0
IPERF; 6,600.0-6,654.0
INJECTION; 6,550.1
PACKER - PATCH - LWR;
6,491.2
INJECTION; 6,480.0
ANCHOR LATCH ON SPACER
PIPE; 6,477.2
LEAK - TUBING; 6,480.0
PACKER - PATCH - UPR;
6,473.2
PACKER; 6,443.4
GAS LIFT; 6,385.4
GAS LIFT; 6,286.5
GAS LIFT; 5,939.0
GAS LIFT; 5,566.4
GAS LIFT; 5,195.2
GAS LIFT; 4,816.4
GAS LIFT; 4,442.4
GAS LIFT; 4,095.0
GAS LIFT; 3,714.8
SURFACE; 30.2-3,159.8
GAS LIFT; 3,024.9
GAS LIFT; 1,942.0
SAFETY VLV; 1,887.0
CONDUCTOR; 31.0-115.0
KUP INJ 2W-16
...
WELLNAME WELLBORE2W-16
From: McLellan, Bryan J (OGC)
Sent: Thursday, January 12, 2023 11:01 AM
To: O'Connor, Katherine
Cc: Loepp, Victoria T (OGC)
Subject: [EXTERNAL]KRU 2W-16 (PTD 184-239) Sundry 322-658
CAUTION:This email originated from outside of the organization. Do not click links or open
attachments unless you recognize the sender and know the content is safe.
Katherine.
As discussed by phone, the referenced sundry called for a 2600 psi tubing test a er se ng the patch
across the upper injec on zone. ConocoPhillips tested the patch to only 2500 psi and called today
reques ng the AOGCC to either accept that test or allow an extension of me to submit the 10-404
(due 1/16/23) to allow for a re-test.
It is important to follow the condi ons listed in the sundry applica ons, so thank you for bringing the
issue to our a en on. Upon further review of the scope of the sundry, the tubing pressure test is
not required by the AOGCC because the tubing integrity is not in ques on at this me. The test was
intended to verify integrity of the patch, which was set to adjust injec on conformance into various
sands within the same pool. Therefor the AOGCC will not require a re-test of the tubing and patch.
CPAI should submit the 10-404 before the due date.
Thank you.
Bryan McLellan
Senior Petroleum Engineer
Alaska Oil & Gas Conserva on Commission
333 W 7th Ave
Anchorage, AK 99501
Bryan.mclellan@alaska.gov
+1 (907) 250-9193
From:McLellan, Bryan J (OGC)
To:katherine.oconnor@conocophillips.com
Cc:Loepp, Victoria T (OGC)
Subject:KRU 2W-16 (PTD 184-239) Sundry 322-658
Date:Thursday, January 12, 2023 11:00:00 AM
Katherine.
As discussed by phone, the referenced sundry called for a 2600 psi tubing test after setting the patch
across the upper injection zone. ConocoPhillips tested the patch to only 2500 psi and called today
requesting the AOGCC to either accept that test or allow an extension of time to submit the 10-404
(due 1/16/23) to allow for a re-test.
It is important to follow the conditions listed in the sundry applications, so thank you for bringing the
issue to our attention. Upon further review of the scope of the sundry, the tubing pressure test is
not required by the AOGCC because the tubing integrity is not in question at this time. The test was
intended to verify integrity of the patch, which was set to adjust injection conformance into various
sands within the same pool. Therefor the AOGCC will not require a re-test of the tubing and patch.
CPAI should submit the 10-404 before the due date.
Thank you.
Bryan McLellan
Senior Petroleum Engineer
Alaska Oil & Gas Conservation Commission
333 W 7th Ave
Anchorage, AK 99501
Bryan.mclellan@alaska.gov
+1 (907) 250-9193
7\SHRI5HTXHVW $EDQGRQ 3OXJ3HUIRUDWLRQV )UDFWXUH6WLPXODWH 5HSDLU:HOO 2SHUDWLRQVVKXWGRZQ
6XVSHQG 3HUIRUDWH 2WKHU6WLPXODWH 3XOO7XELQJ &KDQJH$SSURYHG3URJUDP
3OXJIRU5HGULOO 3HUIRUDWH1HZ3RRO 5HHQWHU6XVS:HOO $OWHU&DVLQJ 2WKHU6HOHFWLYH3DWFK
2SHUDWRU1DPH &XUUHQW:HOO&ODVV 3HUPLWWR'ULOO1XPEHU
([SORUDWRU\ 'HYHORSPHQW
$GGUHVV6WUDWLJUDSKLF 6HUYLFH
$3,1XPEHU
,ISHUIRUDWLQJ:HOO1DPHDQG1XPEHU
:KDW5HJXODWLRQRU&RQVHUYDWLRQ2UGHUJRYHUQVZHOOVSDFLQJLQWKLVSRRO"
:LOOSODQQHGSHUIRUDWLRQVUHTXLUHDVSDFLQJH[FHSWLRQ" <HV 1R
3URSHUW\'HVLJQDWLRQ/HDVH1XPEHU )LHOG &XUUHQW3RROV
7RWDO'HSWK0'IW 7RWDO'HSWK79'IW (IIHFWLYH'HSWK0' (IIHFWLYH'HSWK79' 0363SVL 3OXJV0' -XQN0'
1RQH
&DVLQJ &ROODSVH
6WUXFWXUDO
&RQGXFWRU
6XUIDFH
,QWHUPHGLDWH
3URGXFWLRQ
/LQHU
3DFNHUVDQG66697\SH 3DFNHUVDQG66690'IWDQG79'IW
$WWDFKPHQWV 3URSRVDO6XPPDU\ :HOOERUHVFKHPDWLF :HOO&ODVVDIWHUSURSRVHGZRUN
'HWDLOHG2SHUDWLRQV3URJUDP %236NHWFK ([SORUDWRU\ 6WUDWLJUDSKLF 'HYHORSPHQW 6HUYLFH
(VWLPDWHG'DWHIRU :HOO6WDWXVDIWHUSURSRVHGZRUN
&RPPHQFLQJ2SHUDWLRQV 2,/ :,1- :'63/6XVSHQGHG
9HUEDO$SSURYDO 'DWH *$6 :$* *6725 63/8*
$2*&&5HSUHVHQWDWLYH*,1-2S6KXWGRZQ $EDQGRQHG
&RQWDFW1DPH
&RQWDFW(PDLO
&RQWDFW3KRQH
$XWKRUL]HG7LWOH
&RQGLWLRQVRIDSSURYDO1RWLI\$2*&&VRWKDWDUHSUHVHQWDWLYHPD\ZLWQHVV 6XQGU\1XPEHU
3OXJ,QWHJULW\ %237HVW 0HFKDQLFDO,QWHJULW\7HVW /RFDWLRQ&OHDUDQFH
2WKHU
3RVW,QLWLDO,QMHFWLRQ0,75HT
G"<HV 1R
6SDFLQJ([FHSWLRQ5HTXLUHG"<HV 1R 6XEVHTXHQW)RUP5HTXLUHG
$33529('%<
$SSURYHGE\ &200,66,21(5 7+($2*&& 'DWH
&RPP &RPP 6U3HW(QJ 6U3HW*HR 6U5HV(QJ
3HUIRUDWLRQ'HSWK0'IW
0'
/HQJWK 6L]H
3URSRVHG3RROV
79' %XUVW
35(6(17:(//&21',7,216800$5<
1RQH
67$7(2)$/$6.$
$/$6.$2,/$1'*$6&216(59$7,21&200,66,21
$33/,&$7,21)25681'5<$33529$/6
$$&
$'/
32%R[$QFKRUDJH$.
&RQRFR3KLOOLSV$ODVND,QF
.58:
1$.XSDUXN5LYHU2LO3RRO.XSDUXN5LYHU)LHOG
1$
7XELQJ*UDGH 7XELQJ0'IW
0'DQG
79'
0'DQG
79'
0'DQG
79'
3HUIRUDWLRQ'HSWK79'IW 7XELQJ6L]H
-
3DFNHU%DNHU)+/5WUYEO3DFNHU
3DFNHU%DNHU)%3HUP3DFNHU
6669%DNHU)9/6IW\9OYORFNHGRXW
,KHUHE\FHUWLI\WKDWWKHIRUHJRLQJLVWUXHDQGWKHSURFHGXUHDSSURYHGKHUHLQZLOOQRWEHGHYLDWHGIURPZLWKRXWSULRUZULWWHQDSSURYDO
$XWKRUL]HG1DPHDQG
'LJLWDO6LJQDWXUHZLWK'DWH
$2*&&86(21/<
6WHYH'UDNH
VWHYHJGUDNH#FRQRFRSKLOOLSVFRP
6HQLRU:HOO,QWHUYHQWLRQV(QJLQHHU
)RUP5HYLVHG$SSURYHGDSSOLFDWLRQYDOLGIRUPRQWKVIURPGDWHRIDSSURYDO6XEPLW3')WRDRJFFSHUPLWWLQJ#DODVNDJRY
Steven G Drake Digitally signed by Steven G Drake
Date: 2022.11.18 08:11:07 -09'00'
By Anne Prysunka at 9:24 am, Nov 18, 2022
SVL EMP
'65
%-0
RQRULJLQDO:HOO&RPSOHWLRQ5HSRUW
DQG'DLO\2SV6XPPDU\RI
6)'
6)'
SHURULJLQDO:HOO&RPSOHWLRQ5HSRUWDQG'DLO\2SV6XPPDU\RI6)'
*&:
Jessie L.
Chmielowski
Digitally signed by Jessie L.
Chmielowski
Date: 2022.11.23 10:26:38 -09'00'
RBDMS JSB 112322
Well Work Justification & Objectives:
2W-16 is a single leg A/C sand injector that was drilled and completed in January 1985. Per the recent
2W KRES project it has been deemed necessary to shut off the C sand production in the area, which is
widely watering out. In October of 2022 SL attempted to dummy off the selective but was unsuccessful
as the valve was swapped for an extended packing dummy and still failed to test. This well work request
will cover the steps necessary to determine the exact leak location and then set a patch over the leak.
Risks/Job Concerns (Include Drift information on high deviation wells, or wells with tag issues):
10/27/22 - Pulled and parted HFCV in pocket at 6480' RKB. Recovered remaining part of valve and set
extended packing dummy.
Steps:
Relay - Determine exact leak location/Patch leak
1. Contact Jeremy Fontenot or Ken Adams at Quadco (659-9449)to ensure patch equipment is available.
2. MIRU Relay unit and associated equipment.
3. SI well. Utilizing LRS pump 30 bbl. diesel freeze protect.
4. Set 2.75" D-CSV in nipple @ 6714' RKB.
5. MU and RIH with LDL tools.
6. Utilizing LRS, pump down tubing to activate leak.
7. Determine leak location with LDL tools. (SL could not get good tubing test after swapping valve @
6480') If leak location is different or there are multiple leaks contact Steve Drake 907-223-1166 to
modify patch location.
8. If only leak is at mandrel at 6480' is leaking, prep for patch work.
9. Pull CSV at 6714' RKB.
10. Brush and flush patch setting area from 6650-6750' RKB.
11. Make GR run or dummy patch run to ensure P2P patch equipment can drift to depth.
12. Set lower patch packer @ 6493.68' RKB.
13. Set 15' spacer pipe and upper patch packer @ 6475.68' RKB. (18' CE to CE)
14. Set test tool in upper packer @ 6475.68' RKB. PT tubing to 2500 psi.
15. Pull test tool.
16. RDMO. Hand well over to OPS to return well to production.
37 WXELQJ WR SVL DERYH 0363 EMP
3UHVVXUH WHVW ZLUHOLQH OXEULFDWRU WR SVL EMP
/DVW7DJ
$QQRWDWLRQ 'HSWKIW.% :HOOERUH (QG'DWH /DVW0RG%\
/DVW7DJ5.% : IHUJXVS
/DVW5HY5HDVRQ
$QQRWDWLRQ :HOOERUH (QG'DWH /DVW0RG%\
5HY5HDVRQ7DJ 6HW'9 : IHUJXVS
1RWHV*HQHUDO 6DIHW\
$QQRWDWLRQ (QG'DWH /DVW0RG%\
127( SSURYHQ
*HQHUDO1RWHV/DVWHQWULHV
&RP 'DWH /DVW0RG%\
*/0
5.)6&9,QVWDOOHG $GPLQ
&DVLQJ6WULQJV
&VJ'HV 2'LQ ,'LQ 7RSIW.%
6HW'HSWK
IW.%
6HW'HSWK
79'IW.% :W/HQOEIW *UDGH 7RS7KUHDG
&21'8&725 + :(/'('
685)$&( - %877
352'8&7,21 - %877
7XELQJ6WULQJVVWULQJPD[LQGLFDWHV/21*(67VHJPHQWRIVWULQJ
7RSIW.%
6HW'HSWK«
6HW'HSWK«
6WULQJ0D«
7XELQJ'HVFULSWLRQ
78%,1*
:WOEIW
*UDGH
-
7RS&RQQHFWLRQ
(8(5'
,'LQ
&RPSOHWLRQ'HWDLOVH[FOXGHVWXELQJSXSVSDFHRXWWKUHDG5.%
7RSIW.%
7RS79'
IW.%
7RS,QFO
,WHP'HV
2'
1RPLQDO
LQ&RP 0DNH 0RGHO
1RPLQDO
,'LQ
+$1*(5 )0&*(1,,,78%,1*+$1*(5
6$)(7<9/9 %$.(5)9/6$)(7<9$/9(
/2&.('287
*$6/,)7 &$0&2 .%8*
*$6/,)7 &$0&2 .%8*
*$6/,)7 &$0&2 .%8*
*$6/,)7 &$0&2 .%8*
*$6/,)7 &$0&2 .%8*
*$6/,)7 &$0&2 .%8*
*$6/,)7 &$0&2 .%8*
*$6/,)7 &$0&2 .%8*
*$6/,)7 &$0&2 .%8*
*$6/,)7 &$0&2 .%8*
*$6/,)7 0(5/$ 73';
3%5 %$.(53%5
3$&.(5 %$.(5)+/5(75,(9$%/(
3$&.(5
%/$675,1* %/$675,1*6
%/$67-7 %$.(5%/$67-2,17
/2&$725 %$.(56%5/2&$725
3$&.(5 %$.(5)%3(50$1(17
3$&.(5
6%( %$.(56($/%25((;7(16,21
1,33/( &$0&2'1,33/(12*2
:/(* %$.(5:,5(/,1(5((175<
*8,'(
0DQGUHO,QVHUWVH[FOXGHVSXOOHGLQVHUWV
7RSIW.%
7RS79'
IW.%
7RS
,QFO
6W
DWL
RQ
1R
6 6HUY
9DOYH
7\SH
/DWFK
7\SH
2'
LQ
7525XQ
SVL 5XQ'DWH &RP 0DNH 0RGHO
3RUW
6L]HLQ
*$6/,)7 '0< %.
*$6/,)7 '0< %.
*$6/,)7 '0< %.
*$6/,)7 '0< %.
*$6/,)7 '0< %.
*$6/,)7 '0< %.
*$6/,)7 '0< %.
*$6/,)7 '0< %.
*$6/,)7 '0< %.
*$6/,)7 '0< %.
*$6/,)7 '0< 50
,1- '0< 50 (;7
3DFNL
QJ
,1- '0< 50
,1- '0< 50
3HUIRUDWLRQV 6ORWV
7RSIW.% %WPIW.%
7RS79'
IW.%
%WP79'
IW.% /LQNHG=RQH 'DWH
6KRW
'HQV
VKRWVIW7\SH &RP
&&&
81,7%:
,3(5) SKDVLQJ'$+'
81,7%: ,3(5) SKDVLQJ'$+'
$: ,3(5) SKDVLQJ'$--,,
:$0
9HUWLFDOVFKHPDWLFDFWXDO
352'8&7,21
,3(5)
,3(5)
3$&.(5
,1-(&7,21
,3(5)
,3(5)
,1-(&7,21
,1-(&7,21
3$&.(5
*$6/,)7
*$6/,)7
*$6/,)7
*$6/,)7
*$6/,)7
*$6/,)7
*$6/,)7
*$6/,)7
*$6/,)7
685)$&(
*$6/,)7
*$6/,)7
6$)(7<9/9
&21'8&725
.83,1-
.%*UGIW
55'DWH
2WKHU(OHY«
:
7'
$FW%WPIW.%
:HOO$WWULEXWHV
)LHOG1DPH
.83$58.5,9(581,7
:HOOERUH$3,8:,
:HOOERUH6WDWXV
,1-
0D[$QJOH 0'
,QFO
0'IW.%
:(//1$0( :(//%25(:
$QQRWDWLRQ
/DVW:2
(QG'DWH+6SSP 'DWH&RPPHQW
6669/2&.('287
3HUIRUDWLRQV 6ORWV
7RSIW.% %WPIW.%
7RS79'
IW.%
%WP79'
IW.% /LQNHG=RQH 'DWH
6KRW
'HQV
VKRWVIW7\SH &RP
$: ,3(5) SKDVLQJ'$--,,
:$0
9HUWLFDOVFKHPDWLFDFWXDO
352'8&7,21
,3(5)
,3(5)
3$&.(5
,1-(&7,21
,3(5)
,3(5)
,1-(&7,21
,1-(&7,21
3$&.(5
*$6/,)7
*$6/,)7
*$6/,)7
*$6/,)7
*$6/,)7
*$6/,)7
*$6/,)7
*$6/,)7
*$6/,)7
685)$&(
*$6/,)7
*$6/,)7
6$)(7<9/9
&21'8&725
.83,1-:
:(//1$0( :(//%25(:
2ULJLQDO:HOO&RPSOHWLRQ5HSRUWDQG'DLO\2SV6XPPDU\RI
VSHFLILHV
WR
DQG
WR
6)'
)URP)UHHERUQ'XVW\
7R0F/HOODQ%U\DQ-2*&
&F+REEV*UHJ6'UDNH6WHYH*
6XEMHFW5(>(;7(51$/@5(.58:37'VXQGU\DSSOLFDWLRQ
'DWH:HGQHVGD\1RYHPEHU$0
$WWDFKPHQWVLPDJHSQJ
<RXGRQ
WRIWHQJHWHPDLOIURPGXVW\IUHHERUQ#FRQRFRSKLOOLSVFRP/HDUQZK\WKLVLVLPSRUWDQW
ƌLJĂŶͲ
Dƌ͘ƌĂŬĞŚĂƐƐƚĞƉƉĞĚŽƵƚĨŽƌƚŚĞŚŽůŝĚĂLJďƵƚŚĞƌĞŝƐƚŚĞŝŶĨŽƌŵĂƚŝŽŶLJŽƵŚĂǀĞƌĞƋƵĞƐƚĞĚ͘
ϮtͲϭϲ͗DŽƐƚƌĞĐĞŶƚ^,WǁĂƐŚĂƌǀĞƐƚĞĚŽŶϭϱƵŐϮϬϮϮ͘
ϯϭϴϮƉƐŝĂƚϱϴϲϵ͘ϱ͛ds;ϲϳϭϬ͛DͿ
ϯϭϴϮƉƐŝʹ;ϱϴϳϬdžϬ͘ϭͿсϮϱϵϱƉƐŝ
DW^WĨŽƌϮtͲϭϲŝƐĐĂůĐƵůĂƚĞĚĂƚϮϱϵϱƉƐŝ
>ĞƚŵĞŬŶŽǁŝĨLJŽƵŶĞĞĚĂŶLJĂĚĚŝƚŝŽŶĂůŝŶĨŽƌŵĂƚŝŽŶĂŶĚŚŽƉĞLJŽƵŚĂǀĞĂŐƌĞĂƚdŚĂŶŬƐŐŝǀŝŶŐ
ǁĞĞŬĞŶĚ͘
'XVW\)UHHERUQ
:HOO,QWHJULW\6SHFLDOLVW
&RQRFR3KLOOLSV$ODVND,QF
2IILFHSKRQH
&HOOSKRQH
&ƌŽŵ͗DĐ>ĞůůĂŶ͕ƌLJĂŶ:;K'ͿфďƌLJĂŶ͘ŵĐůĞůůĂŶΛĂůĂƐŬĂ͘ŐŽǀх
^ĞŶƚ͗dƵĞƐĚĂLJ͕EŽǀĞŵďĞƌϮϮ͕ϮϬϮϮϱ͗ϱϭ͗ϰϮD
dŽ͗ƌĂŬĞ͕^ƚĞǀĞ'ф^ƚĞǀĞ͘'͘ƌĂŬĞΛĐŽŶŽĐŽƉŚŝůůŝƉƐ͘ĐŽŵх
Đ͗,ŽďďƐ͕'ƌĞŐ^ф'ƌĞŐ͘^͘,ŽďďƐΛĐŽŶŽĐŽƉŚŝůůŝƉƐ͘ĐŽŵх
^ƵďũĞĐƚ͗Z͗ydZE>Z͗<ZhϮtͲϭϲ;WdϭϴϰͲϮϯϵͿƐƵŶĚƌLJĂƉƉůŝĐĂƚŝŽŶ
^ƚĞǀĞ͕
DW^WŝƐĞƋƵĂůƚŽƌĞƐĞƌǀŽŝƌƉƌĞƐƐƵƌĞŵŝŶƵƐϬ͘ϭƉƐŝͬĨƚŐĂƐŐƌĂĚŝĞŶƚ͘:ƵƐƚǁĂŶƚƚŽĚŽƵďůĞĐŚĞĐŬƚŚĂƚ͛Ɛ
ŚŽǁLJŽƵĚĞƌŝǀĞĚƚŚĞDW^WсϮϱϬϬƉƐŝŝŶLJŽƵƌĞŵĂŝůďĞůŽǁ͘WůĞĂƐĞƐĞŶĚƚŚĞƌĞƐĞƌǀŽŝƌƉƌĞƐƐƵƌĞͬdsƐŽ
/ĐĂŶǀĞƌŝĨLJ͘
dŚĂŶŬƐ
ƌLJĂŶDĐ>ĞůůĂŶ
^ĞŶŝŽƌWĞƚƌŽůĞƵŵŶŐŝŶĞĞƌ
ůĂƐŬĂKŝůΘ'ĂƐŽŶƐĞƌǀĂƚŝŽŶŽŵŵŝƐƐŝŽŶ
&$87,217KLVHPDLORULJLQDWHGIURPRXWVLGHWKH6WDWHRI$ODVNDPDLOV\VWHP
'RQRWFOLFNOLQNVRURSHQDWWDFKPHQWVXQOHVV\RXUHFRJQL]HWKHVHQGHUDQGNQRZ
WKHFRQWHQWLVVDIH
ϯϯϯtϳƚŚǀĞ
ŶĐŚŽƌĂŐĞ͕<ϵϵϱϬϭ
ƌLJĂŶ͘ŵĐůĞůůĂŶΛĂůĂƐŬĂ͘ŐŽǀ
нϭ;ϵϬϳͿϮϱϬͲϵϭϵϯ
&ƌŽŵ͗ƌĂŬĞ͕^ƚĞǀĞ'ф^ƚĞǀĞ͘'͘ƌĂŬĞΛĐŽŶŽĐŽƉŚŝůůŝƉƐ͘ĐŽŵх
^ĞŶƚ͗DŽŶĚĂLJ͕EŽǀĞŵďĞƌϮϭ͕ϮϬϮϮϲ͗ϭϴWD
dŽ͗DĐ>ĞůůĂŶ͕ƌLJĂŶ:;K'ͿфďƌLJĂŶ͘ŵĐůĞůůĂŶΛĂůĂƐŬĂ͘ŐŽǀх
Đ͗,ŽďďƐ͕'ƌĞŐ^ф'ƌĞŐ͘^͘,ŽďďƐΛĐŽŶŽĐŽƉŚŝůůŝƉƐ͘ĐŽŵх
^ƵďũĞĐƚ͗ZĞ͗ydZE>Z͗<ZhϮtͲϭϲ;WdϭϴϰͲϮϯϵͿƐƵŶĚƌLJĂƉƉůŝĐĂƚŝŽŶ
ƌŝĂŶ͕
zĞƐ/͛ŵŽŶǀĂĐĂƚŝŽŶďƵƚĐŚĞĐŬŝŶŐŵLJĞŵĂŝůƌŝŐŚƚŶŽǁ͘DW^WǁŝůůďĞϮϱϬϬƉƐŝƚŽƚĞƐƚƚŚĞƵƉƉĞƌ
ƉĂĐŬĞƌŽŶĐĞǁĞŚĂǀĞƚŚĞƉĂƚĐŚƐĞƚ͘
dŚĂŶŬƐ͕
^ƚĞǀĞ
'ĞƚKƵƚůŽŽŬĨŽƌŝK^
&ƌŽŵ͗DĐ>ĞůůĂŶ͕ƌLJĂŶ:;K'ͿфďƌLJĂŶ͘ŵĐůĞůůĂŶΛĂůĂƐŬĂ͘ŐŽǀх
^ĞŶƚ͗DŽŶĚĂLJ͕EŽǀĞŵďĞƌϮϭ͕ϮϬϮϮϮ͗Ϭϴ͗ϱϵWD
dŽ͗ƌĂŬĞ͕^ƚĞǀĞ'ф^ƚĞǀĞ͘'͘ƌĂŬĞΛĐŽŶŽĐŽƉŚŝůůŝƉƐ͘ĐŽŵх
Đ͗,ŽďďƐ͕'ƌĞŐ^ф'ƌĞŐ͘^͘,ŽďďƐΛĐŽŶŽĐŽƉŚŝůůŝƉƐ͘ĐŽŵх
^ƵďũĞĐƚ͗ydZE>Z͗<ZhϮtͲϭϲ;WdϭϴϰͲϮϯϵͿƐƵŶĚƌLJĂƉƉůŝĐĂƚŝŽŶ
CAUTION:This email originated from outside of the organization. Do not click links or open
attachments unless you recognize the sender and know the content is safe.
,ŝ^ƚĞǀĞ͕
/ŬŶŽǁLJŽƵŐƵLJƐĂƌĞŝŶĂƌƵƐŚĨŽƌƚŚŝƐŽŶĞ͕ďƵƚ/ŶĞĞĚƚŽĞŶƚĞƌƚŚĞDW^WŽŶƚŚĞĐŽǀĞƌƉĂŐĞďĞĨŽƌĞ/
ƐƵďŵŝƚŝƚ͘
/͛ŵĐŽƉLJŝŶŐ'ƌĞŐŝŶĐĂƐĞLJŽƵĂƌĞŽƵƚŽŶǀĂĐĂƚŝŽŶďĞĐĂƵƐĞƚŚŝƐŚĂƐĂƐŚŽƌƚĨƵƐĞ͘
ƌLJĂŶDĐ>ĞůůĂŶ
^ĞŶŝŽƌWĞƚƌŽůĞƵŵŶŐŝŶĞĞƌ
ůĂƐŬĂKŝůΘ'ĂƐŽŶƐĞƌǀĂƚŝŽŶŽŵŵŝƐƐŝŽŶ
ϯϯϯtϳƚŚǀĞ
ŶĐŚŽƌĂŐĞ͕<ϵϵϱϬϭ
ƌLJĂŶ͘ŵĐůĞůůĂŶΛĂůĂƐŬĂ͘ŐŽǀ
нϭ;ϵϬϳͿϮϱϬͲϵϭϵϯ
&ƌŽŵ͗DĐ>ĞůůĂŶ͕ƌLJĂŶ:;K'Ϳ
^ĞŶƚ͗&ƌŝĚĂLJ͕EŽǀĞŵďĞƌϭϴ͕ϮϬϮϮϮ͗ϱϵWD
dŽ͗ƐƚĞǀĞ͘Ő͘ĚƌĂŬĞΛĐŽŶŽĐŽƉŚŝůůŝƉƐ͘ĐŽŵ
^ƵďũĞĐƚ͗<ZhϮtͲϭϲ;WdϭϴϰͲϮϯϵͿƐƵŶĚƌLJĂƉƉůŝĐĂƚŝŽŶ
^ƚĞǀĞ͕
ŽƵůĚLJŽƵƐĞŶĚƚŚĞDW^WĨŽƌƚŚŝƐǁĞůůĂŶĚďĂƐŝƐĨŽƌĐĂůĐƵůĂƚŝŶŐŝƚ͍dŚĞďŽdžǁĂƐůĞĨƚďůĂŶŬŽŶƚŚĞϭϬͲ
ϰϬϯĨŽƌŵ͘
dŚĂŶŬLJŽƵ
ƌLJĂŶDĐ>ĞůůĂŶ
^ĞŶŝŽƌWĞƚƌŽůĞƵŵŶŐŝŶĞĞƌ
ůĂƐŬĂKŝůΘ'ĂƐŽŶƐĞƌǀĂƚŝŽŶŽŵŵŝƐƐŝŽŶ
ϯϯϯtϳƚŚǀĞ
ŶĐŚŽƌĂŐĞ͕<ϵϵϱϬϭ
ƌLJĂŶ͘ŵĐůĞůůĂŶΛĂůĂƐŬĂ͘ŐŽǀ
нϭ;ϵϬϳͿϮϱϬͲϵϭϵϯ
Originated: Delivered to:14-Jan-22Halliburton Alaska Oil and Gas Conservation Comm.Wireline & Perforating Attn.: Natural Resource TechnicianAttn: Fanny Haroun 333 West 7th Avenue, Suite 1006900 Arctic Blvd. Anchorage, Alaska 99501Anchorage, Alaska 99518Office: 907-275-2605FRS_ANC@halliburton.comThe technical data listed below is being submitted herewith. Please address any problems orconcerns to the attention of the sender aboveWELL NAME API # SERVICE ORDER # FIELD NAME JOB TYPE DATA TYPE LOGGING DATE PRINTS #DIGITAL #1 1A-05 50-029-20627-00 907568283 Kuparuk River Multi Finger Caliper Field & Processed 13-Dec-21 0 12 1A-19 50-029-22111-00 n/a Kuparuk River Plug Setting Record Field- Final 9-Dec-21 0 13 1E-31 50-029-22791-00 907551730 Kuparuk River Leak Detect Log Field- Final 7-Dec-21 0 14 1E-31 50-029-22791-00 907551730 Kuparuk River Multi Finger Caliper Field & Processed 6-Dec-21 0 15 1L-19 50-029-22049-00 907423896 Kuparuk River Multi Finger Caliper Field & Processed 27-Dec-21 0 16 1L-19A 50-029-22049-01 n/a Kuparuk River Multi Finger Caliper Field & Processed 10-Jan-22 0 17 2W-16 50-029-21255-00 907594924 Kuparuk River Plug Setting Record Field- Final 29-Dec-21 0 18 3B-16 50-029-21289-00 907292763 Kuparuk River Leak Detect Log Field- Final 28-Nov-21 0 19 3B-16 50-029-21289-00 907292763 Kuparuk River Multi Finger Caliper Field & Processed 3-Dec-21 0 110 3F-04 50-029-21449-00 907551131 Kuparuk River Multi Finger Caliper Field & Processed 4-Dec-21 0 1PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING A COPY OF THE TRANSMITTAL LETTER TO THE ATTENTION OF:Fanny Haroun, Halliburton Wireline & Perforating, 6900 Arctic Blvd., Anchorage, AK 99518FRS_ANC@halliburton.comDate:Signed:Transmittal Date:01/14/2022Wd͗ϭϴϰϮϯϵϬͲ^Ğƚ͗ϯϲϮϯϱBy Abby Bell at 12:45 pm, Jan 14, 2022
2SHUDWLRQV $EDQGRQ 3OXJ3HUIRUDWLRQV )UDFWXUH6WLPXODWH 3XOO7XELQJ 2SHUDWLRQVVKXWGRZQ
3HUIRUPHG 6XVSHQG 3HUIRUDWH 2WKHU6WLPXODWH $OWHU&DVLQJ &KDQJH$SSURYHG3URJUDP
3OXJIRU5HGULOO 3HUIRUDWH1HZ3RRO 5HSDLU:HOO 5HHQWHU6XVS:HOO 2WKHU%UDLGHQKHDGUHSDLU
&RQRFR3KLOOLSV$ODVND,QF 'HYHORSPHQW ([SORUDWRU\
6WUDWLJUDSKLF 6HUYLFH $3,1XPEHU
3URSHUW\'HVLJQDWLRQ/HDVH1XPEHU:HOO1DPHDQG1XPEHU
/RJV/LVWORJVDQGVXEPLWHOHFWURQLFGDWDSHU$$&)LHOG3RROV
3UHVHQW:HOO&RQGLWLRQ6XPPDU\
7RWDO'HSWK PHDVXUHG
IHHW
IHHW
WUXHYHUWLFDO
IHHW
IHHW
(IIHFWLYH'HSWK PHDVXUHG 1$ IHHW
IHHW
WUXHYHUWLFDO 1$ IHHW
IHHW
3HUIRUDWLRQGHSWK 0HDVXUHGGHSWK
IHHW
7UXH9HUWLFDOGHSWK
IHHW
7XELQJVL]HJUDGHPHDVXUHGDQGWUXHYHUWLFDOGHSWK -
3DFNHUVDQG6669W\SHPHDVXUHGDQGWUXHYHUWLFDOGHSWK%DNHU)+/%DNHU)%
6WLPXODWLRQRUFHPHQWVTXHH]HVXPPDU\1$
,QWHUYDOVWUHDWHGPHDVXUHG
7UHDWPHQWGHVFULSWLRQVLQFOXGLQJYROXPHVXVHGDQGILQDOSUHVVXUH1$
3ULRUWRZHOORSHUDWLRQ
6XEVHTXHQWWRRSHUDWLRQ
:HOO&ODVVDIWHUZRUN
'DLO\5HSRUWRI:HOO2SHUDWLRQV ([SORUDWRU\ 'HYHORSPHQW 6HUYLFH 6WUDWLJUDSKLF
&RSLHVRI/RJVDQG6XUYH\V5XQ :HOO6WDWXVDIWHUZRUN 2LO *DV :'63/
(OHFWURQLF)UDFWXUH6WLPXODWLRQ'DWD*6725 *,1-6863 63/8*
6XQGU\1XPEHURU1$LI&2([HPSW
&RQWDFW1DPH5RJHU:LQWHU
&RQWDFW(PDLO1#FRQRFRSKLOOLSVFRP
$XWKRUL]HG7LWOH:,)LHOG6XSHUYLVRU &RQWDFW3KRQH
%XUVW &ROODSVH
PHDVXUHG3OXJV
-XQN PHDVXUHG
/HQJWK
6L]H
&RQGXFWRU
6XUIDFH
,QWHUPHGLDWH
3URGXFWLRQ
/LQHU
&DVLQJ
67$7(2)$/$6.$
$/$6.$2,/$1'*$6&216(59$7,21&200,66,21
5(32572)681'5<:(//23(5$7,216
1$
3HUPLWWR'ULOO1XPEHU2SHUDWRU1DPH :HOO&ODVV%HIRUH:RUN
$'/
.XSDUXN5LYHU.XSDUXN5LYHU2LO
32%R[$QFKRUDJH$N$GGUHVV
.XSDUXN5LY8QLW:
PHDVXUHG
WUXHYHUWLFDO
3DFNHU
5HSUHVHQWDWLYH'DLO\$YHUDJH3URGXFWLRQRU,QMHFWLRQ'DWD
&DVLQJ3UHVVXUH 7XELQJ3UHVVXUH
1$1$1$
1$1$
$WWDFKPHQWVUHTXLUHGSHU$$&
1$
*DV0FI
0'
1$
6WUXFWXUDO
79'
1$
6U3HW(QJ6U3HW*HR6U5HV(QJ
$XWKRUL]HG1DPHDQG'LJLWDO
6LJQDWXUHZLWK'DWH
:,1-:$*
1$
:DWHU%EO2LO%EO
,KHUHE\FHUWLI\WKDWWKHIRUHJRLQJLVWUXHDQGFRUUHFWWRWKHEHVWRIP\NQRZOHGJH
1$
1$
W
)UD
2
J
J
O
J
$
*
/
3*
5
)RUP5HYLVHG6XEPLW:LWKLQGD\VRI2SHUDWLRQV
By Samantha Carlisle at 9:46 am, Jan 13, 2022
'LJLWDOO\VLJQHGE\5RJHU:LQWHU
'1&1 5RJHU:LQWHU
( Q#FRQRFRSKLOOLSVFRP& 86
5HDVRQ,DPWKHDXWKRURIWKLVGRFXPHQW
/RFDWLRQ\RXUVLJQLQJORFDWLRQKHUH
'DWH
)R[LW3')(GLWRU9HUVLRQ
5RJHU
:LQWHU
DSR-1/13/22
32%2;
$1&+25$*($/$6.$
-DQXDU\
&RPPLVVLRQHU-HVVLH&KPLHORZVNL
$ODVND2LO *DV&RPPLVVLRQ
:HVWWK$YHQXH6XLWH
$QFKRUDJH$.
'HDU&RPPLVVLRQHU&KPLHORZVNL
(QFORVHGSOHDVHILQGWKHIRU%UDLGHQKHDGUHSDLUIURP&RQRFR3KLOOLSV$ODVND
,QFZHOO.58:37'
3OHDVHFRQWDFW5RJHU0RXVHURUP\VHOIDWLI\RXKDYHDQ\TXHVWLRQV
6LQFHUHO\
5RJHU:LQWHU
:HOO,QWHJULW\)LHOG6XSHUYLVRU
&RQRFR3KLOOLSV$ODVND,QF
'LJLWDOO\VLJQHGE\5RJHU:LQWHU
'1&1 5RJHU:LQWHU( Q#FRQRFRSKLOOLSVFRP
& 86
5HDVRQ,DPWKHDXWKRURIWKLVGRFXPHQW
/RFDWLRQ\RXUVLJQLQJORFDWLRQKHUH
'DWH
)R[LW3')(GLWRU9HUVLRQ
5RJHU:LQWHU
3UHS%UDLGHQKHDGIRUUHSDLUV
+HDWZHOGDUHDDQGPDNHSDVV
VZHOGV
:HOGVSDVVHGLQVSHFWLRQV0,72$SDVVHGWRSVL
/DVW7DJ
$QQRWDWLRQ 'HSWKIW.% (QG'DWH :HOOERUH /DVW0RG%\
/DVW7DJ5.% : SSURYHQ
/DVW5HY5HDVRQ
$QQRWDWLRQ (QG'DWH :HOOERUH /DVW0RG%\
5HY5HDVRQ6HW5%3 : IHUJXVS
&DVLQJ6WULQJV
&DVLQJ'HVFULSWLRQ
&21'8&725
2'LQ
,'LQ
7RSIW.%
6HW'HSWKIW.%
6HW'HSWK79'«
:W/HQO«
*UDGH
+
7RS7KUHDG
:(/'('
&DVLQJ'HVFULSWLRQ
685)$&(
2'LQ
,'LQ
7RSIW.%
6HW'HSWKIW.%
6HW'HSWK79'«
:W/HQO«
*UDGH
-
7RS7KUHDG
%877
&DVLQJ'HVFULSWLRQ
352'8&7,21
2'LQ
,'LQ
7RSIW.%
6HW'HSWKIW.%
6HW'HSWK79'«
:W/HQO«
*UDGH
-
7RS7KUHDG
%877
7XELQJ6WULQJV
7XELQJ'HVFULSWLRQ
78%,1*
6WULQJ0D«
,'LQ
7RSIW.%
6HW'HSWKIW«
6HW'HSWK79'«
:WOEIW
*UDGH
-
7RS&RQQHFWLRQ
(8(5'
&RPSOHWLRQ'HWDLOV
7RSIW.%
7RS79'
IW.% 7RS,QFO ,WHP'HV
1RPLQDO,'
LQ
2'
1RPLQDO
LQ0DNH 0RGHO &RP
+$1*(5 )0&*(1,,,78%,1*
+$1*(5
6$)(7<9/9 %$.(5)9/6$)(7<
9$/9(/2&.('287
*$6/,)7 &$0&2 .%8*
*$6/,)7 &$0&2 .%8*
*$6/,)7 &$0&2 .%8*
*$6/,)7 &$0&2 .%8*
*$6/,)7 &$0&2 .%8*
*$6/,)7 &$0&2 .%8*
*$6/,)7 &$0&2 .%8*
*$6/,)7 &$0&2 .%8*
*$6/,)7 &$0&2 .%8*
*$6/,)7 &$0&2 .%8*
*$6/,)7 0(5/$ 73';
3%5 %$.(53%5
3$&.(5 %$.(5)+/
5(75,(9$%/(3$&.(5
%/$675,1* %/$675,1*6
%/$67-7 %$.(5%/$67-2,17
/2&$725 %$.(56%5/2&$725
3$&.(5 %$.(5)%
3(50$1(173$&.(5
6%( %$.(56($/%25(
(;7(16,21
1,33/( &$0&2'1,33/(12*2
:/(* %$.(5:,5(/,1(5(
(175<*8,'(
2WKHU,Q+ROH:LUHOLQHUHWULHYDEOHSOXJVYDOYHVSXPSVILVKHWF
7RS
IW.%
7RS
79'
IW.%
7RS,QFO
'HV &RP 5XQ'DWH ,'LQ 61
3/8* 6HW5%3[
ORQJ &33&3
(4
0DQGUHO,QVHUWV
6W
DWL
RQ
1
R7RSIW.%
7RS79'
IW.%
7RS
,QFO 0DNH 0RGHO 2'LQ 6HUY
9DOYH
7\SH
/DWFK
7\SH
3RUW6L]H
LQ
7525XQ
SVL 5XQ'DWH &RP
*$6/,)7 '0< %.
*$6/,)7 '0< %.
*$6/,)7 '0< %.
*$6/,)7 '0< %.
*$6/,)7 '0< %.
*$6/,)7 '0< %.
*$6/,)7 '0< %.
*$6/,)7 '0< %.
*$6/,)7 '0< %.
*$6/,)7 '0< %.
*$6/,)7 '0< 50
,1- +)&9 50
,1- '0< 50
,1- '0< 50
3HUIRUDWLRQV 6ORWV
7RSIW.% %WPIW.%
7RS79'
IW.%
%WP79'
IW.% /LQNHG=RQH 'DWH
6KRW
'HQV
VKRWVIW
7\SH &RP
&&&
81,7%:
,3(5) SKDVLQJ'$+'
81,7%: ,3(5) SKDVLQJ'$+'
$: ,3(5) SKDVLQJ'$--,,
$: ,3(5) SKDVLQJ'$--,,
:$0
9HUWLFDOVFKHPDWLFDFWXDO
352'8&7,21
,3(5)
,3(5)
:/(*
1,33/(
6%(
3$&.(5
/2&$725
,1-(&7,21
,3(5)
,3(5)
,1-(&7,21
,1-(&7,21
3/8*
3$&.(5
3%5
*$6/,)7
*$6/,)7
*$6/,)7
*$6/,)7
*$6/,)7
*$6/,)7
*$6/,)7
*$6/,)7
*$6/,)7
685)$&(
*$6/,)7
*$6/,)7
6$)(7<9/9
&21'8&725
+$1*(5
.83,1-
.%*UGIW
5LJ5HOHDVH'DWH
:
7'
$FW%WPIW.%
:HOO$WWULEXWHV
)LHOG1DPH
.83$58.5,9(581,7
:HOOERUH$3,8:,
:HOOERUH6WDWXV
,1-
0D[$QJOH 0'
,QFO
0'IW.%
:(//1$0( :(//%25(:
$QQRWDWLRQ
/DVW:2
(QG'DWH+6SSP 'DWH&RPPHQW
6669/2&.('287
1RWHV*HQHUDO 6DIHW\
(QG'DWH $QQRWDWLRQ
127(
:$0
9HUWLFDOVFKHPDWLFDFWXDO
352'8&7,21
,3(5)
,3(5)
:/(*
1,33/(
6%(
3$&.(5
/2&$725
,1-(&7,21
,3(5)
,3(5)
,1-(&7,21
,1-(&7,21
3/8*
3$&.(5
3%5
*$6/,)7
*$6/,)7
*$6/,)7
*$6/,)7
*$6/,)7
*$6/,)7
*$6/,)7
*$6/,)7
*$6/,)7
685)$&(
*$6/,)7
*$6/,)7
6$)(7<9/9
&21'8&725
+$1*(5
.83,1-:
:(//1$0( :(//%25(:
MEMORANDUM
State of Alaska
Alaska Oil and Gas Conservation Commission
DATE: Friday, May 31, 2019
TO: Jim Regg �
P.1. Supervisor j\C� %/rz'(1
SUBJECT: Mechanical Integrity Tests
c /
CONOCOPHILLIPS ALASKA, INC.
2W-16
FROM: Jeff Jones
KUPARUK RIV UNIT 2W-16
Petroleum Inspector
Sre: Inspector
Reviewed By:
P.1. Sup" J�(Z-
NON-CONFIDENTIAL
Comm
Well Name KUPARUK RIV UNIT 2W-16 API Well Number 50-029-21255-00-00 Inspector Name: Jeff Jones
Permit Number: 184-239-0 Inspection Date: 5!12/2019
Insp Num: miU1190531102857
Rel Insp Num:
Packer Depth Pretest Initial 15 Min 30 Min 45 Min 60 Min
Well 2W-16 Typelnj W ,TVD 5743 Tubing '2i0 2210 2210 2210
PTD ---1842390 -IType Testl SPT Test psi 1500 IA 910 1 2900 - 2790 - 2760 -
BBL Pumped: 19 ' !BBL Returned: 1.9 ' OA .90 - 580 580 580
Interval' f 4YRTSr P/F P
Notes- I well inspected, no exceptions noted.
Friday, May 31, 2019 Page I of I
ti?
~cu. >
GIS x
wrw
1..k.
�°
o-w a s
aMY L Y O ° CD ')
r u - >
1r Q •,4. '' m 4-+ O vi a)
a c c C0
a� n3
` a = 7
O 71,Q r r r r r r r u ) a) O m
(� i E -u -c -o O N
G O > > > > > > > L +
N ,-- O co O N N N 0 (a 4-, - C
Z Q u 'a M O
Z
CE 0 v > -a a)
O C i
F F n3 a) N Q O
0000000
J J J J J J J — C O
y W W W W W W W 'v, a) C U `~
I- U. U. U. U. LL LL LL +-, a) a) a)
0 Q J J J J J J J O' _0 > a)
r. a a u Q Q Q Q Q Q Q rt3N �O
0 Q ❑ z z z z z z z a) _c v y v
LL LL L.L. LL LL LL LL cC — J C >
f0 > 4- a)
' a) ro c a)
O Z Ea; v u >
y U b O C O w o �t
U f0 � LL LL LL LL LL LL
N Z p 0000 '6. 330
CC o iC J J W \
4) m U ,i, U
b . w \ a)
ro
fa t:4 0 .r:-.4''
iz
0 co W O
V d J J J J J J J
� za • 03333333
W
0
W W W W W W W
W > > > > > > >
2 C4 C4 Ce Ce et W r4
z Y Y Y Y Y Y Y
Ci
w CLIICGCLIYCLCe
Q Q Q Q Q Q Q v )7 0
LL a a a a a a a +J
12,= t-. U > > > > > > > @ a
` Y Y Y Y Y Y Y c L
/�uJ''t N tiff O
X LI
co
Lt•) 0 V '1 'et Tr 141 0 0 co 0
Lli N acc
a 0 0 0 0 o y
I I 0 0 0 0 0 0 0
(V' O v N V) V) N- r N- N
0 0 0 CO CO CO CO fa>
0000000❑ Q C
UNa
CC x 0 m
coa
0
0 0 0 0 0 0 ,- o O Q
N0 0 0 0 0 0 0
V {o )r') CO O r U) iV40 • v
N. )() M a..
M O N 0) t0 0) N a -
N d N N N N N N N N
R
R Q 0) O O) CI) O M M C O d
N N N N N O Oco
al a a a a a 0 0
0 0 0 0 0 0 0 Y V C 0
C CO K) )f) )f) U) N )f) )f) 1 4,13 O C
Q) E a) 00 • Q.
W Y UJ
rt H E E
Nn)
v a a N 2 (13
u 112 a .-1 r , CO u) •O a (0 4, v c `
Z N 00 M Z z O O o .- N .. E a) a) v
= 0. VI IT r J N Y N N m N
c o .:z o N �. ? N N M N N o Z to 0 0
O )J a G F- a` a H H
Regg, James B (DOA)
From: NSK Problem Well Supv <n1617@conocophillips.com>
Sent: Monday, August 31, 2015 9:35 AM
To: Wallace, Chris D (DOA); DOA AOGCC Prudhoe Bay; Regg,James B (DOA); Brooks,
Phoebe L (DOA)
Cc: Senden, R.Tyler
Subject: Recent MIT's performed at KRU
Attachments: MIT KRU 1E-08A 08-27-15.xls; MIT KRU 1Y-10 08-27-15.xls; MIT KRU 2H-04
08-27-15.xls; MIT KRU 2U-03 08-27-15.xls; MIT KRU 2W-16 08-27-15.xls
Attached are copies of the recent MIT's performed at KRU. Please let me know if you have any questions.
Brent Rogers/Kelly Lyons
Problem Wells Supervisor
ConocoPhillips Alaska, Inc.
Desk Phone (907) 659-7224
Pager(907) 659-7000 pgr. 909
0.4):01ELLS TEAM
swim
1
•
• •
• STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
Mechanical Integrity Test
Submit to: jim.recidaalaska.gov AOGCC.Inspectorsaalaska.cov; phoebe.brooks(rDalaska.00v chris.wallaaceCrD.alaska.gov
OPERATOR: ConocoPhillips Alaska,Inc. ] Jib
ll
FIELD/UNIT/PAD: Kuparuk/KRU/2W
DATE: 08/27/15
OPERATOR REP: Riley/Beck
AOGCC REP:
Packer Depth Pretest Initial 15 Min. 30 Min. 45 Min. 60 Min.
Well 2W-16 Type Inj. W TVD - 5,745' Tubing '2,100 2,100 2,100 2,100 Interval 4
P.T.D. 1842390 • Type test P Test psi "1500 Casing 1,300 2,910 2,830 2,800 P/F P r"
Notes: Bob Noble waived right to witness 4 year MITIA. OA 350 400 400 400
Well Type Inj. TVD TubingInterval
P.T.D. Type test Test psi Casing P/F
Notes: OA
Well Type Inj. TVD TubingInterval
P.T.D. Type test Test psi Casing P/F
Notes: OA
Well Type Inj. TVD TubingInterval
P.T.D. Type test Test psi Casing P/F
Notes: OA
Well Type Inj. TVD TubingInterval
P.T.D. Type test Test psi CasingP/F
Notes: OA
TYPE INJ Codes TYPE TEST Codes INTERVAL Codes
D=Drilling Waste M=Annulus Monitoring I=Initial Test
0=Gas P=Standard Pressure Test 4=Four Year Cycle
I=Industrial Wastewater R=Internal Radioactive Tracer Survey V=Required by Variance
N=Not Injecting A=Temperature Anomaly Survey 0=Other(describe in notes)
W=Water D=Differential Temperature Test
Form 10-426(Revised 11/2012) MIT KRU 2W-16 08-27-15.xls
KEU1
PT') l'64 Z 310
Regg, James B (DOA)
From: NSK Problem Well Supv <n1617@conocophillips.com>
Sent: Tuesday, May 12, 2015 7:56 PM
To: Wallace, Chris D (DOA); Regg, James B (DOA); DOA AOGCC Prudhoe Bay; Brooks,
Phoebe L (DOA)
Cc: Senden, R. Tyler
Subject: KRU MIT forms
Attachments: MIT KRU 1G-05 05-8-15.xls; MIT KRU 1R PAD 05-08-15.xls; MIT KRU 2E-03 05-09-15.xls;
MIT KRU 2M-14 05-09-15.xls; MIT KRU 2V-04 05-09-15.xls; MIT KRU 2W PAD
05-09-15.xls; MIT KRU 2W PAD SI 05-09-15.xls �-3
Attached are copies of the forms for the recent MIT's performed at Kuparuk. Please let me know if you have any
questions.
Brent Rogers / Kelly Lyons
Problem Wells Supervisor
ConocoPhillips Alaska, Inc.
Desk Phone (907) 659-7224
Pager (907) 659-7000 pgr. 909
SCANNED JUN 0 8 2015
" WELLS TEAM
conoccoPhdupti
1
•
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
Mechanical Integrity Test
Submit to: jim.regq( alaska.gov. AOGCC.Inspectors@alaska.gov• phoebe.brooksnalaska.gov chris.wallace@alaska.gov
OPERATOR: ConocoPhillips Alaska, Inc. 2ei
q, 6(` 07
FIELD/UNIT/PAD: Kuparuk/KRU/2W
DATE: 05/09/15
OPERATOR REP: Manjarrez,Beck,Hollandsworth,Duffy
AOGCC REP:
Packer Depth Pretest Initial 15 Min. 30 Min. 45 Min. 60 Min.
Well 2W-04 Type Inj. N TVD 5,696' Tubing 640 640 640 640 Interval 4
P.T D. 1850120 Type test P Test psi 1500 Casing 250 1,800 1,730 1,710 P/F P
Notes: Non-witnessed OA 60 60 60 60
Inspector elected to not witness test on shut in well
Well 2W-05 Type Inj. N TVD 5,690' Tubing 1,550 1,550 1,550 1,550 Interval 4
P T.D. 1841910 Type test P Test psi 1500 Casing 350 2,320 2,220 2,200 P/F P
Notes: Non-witnessed OA 175 175 175 175
Inspector elected to not witness test on shut in well
Well 2W-08 Type Inj. N TVD 5,744' Tubing 250 250 250 250 Interval 4
P.T.D. 1842120 Type test P Test psi 1500 Casing 600 1,820 1,760 1,740 P/F P
Notes: Non-witnessed OA 60 60 60 60
Inspector elected to not witness test on shut in well
Well 2W-09 Type Inj. N TVD 5,686' Tubing 520 530 530 530 Interval 4
P.T.D. 1842190 Type test P Test psi 1500 Casing 520 1,800 1,740 1,720 P/F P
Notes: Non-witnessed OA 55 55 55 55
Inspector elected to not witness test on shut in well
(... .., Well.2W-16T
Inj. N TVD 5,745' Tubing, 1,250 1,250 1,250 1,250 Interval 4
P.T D. 1842390 Type test P Test psi 1500 Casing 440 2,000 • 1,920 1,910 P/F P
Notes: Non-witnessed OA 80 80 80 80
Inspector elected to not witness test on shut in well
Well Type Inj. TVD Tubing Interval
P.T.D. Type test Test psi Casing P/F
Notes: OA
Well Type Inj. TVD _ Tubing Interval
P T D. Type test Test psi Casing P/F
Notes: OA
Well Type Inj. TVD Tubing_ Interval
P.T.D. Type test Test psi Casing P/F
•
Notes: OA
Well Type Inj. TVD Tubing Interval
P.T.D. Type test Test psi Casing P/F
Notes: OA
Well Type Inj. TVD Tubing Interval
P.T.D. Type test Test psi Casing P/F
Notes: OA
Well Type Inj. TVD Tubing Interval
P.T.D. Type test Test psi Casing P/F
Notes: OA
Well Type Inj. TVD Tubing Interval
P.T.D. Type test Test psi Casing P/F
Notes: OA I
TYPE INJ Codes TYPE TEST Codes INTERVAL Codes
D=Drilling Waste M=Annulus Monitoring I=Initial Test
G=Gas P=Standard Pressure Test 4=Four Year Cycle
I=Industrial Wastewater R=Internal Radioactive Tracer Survey V=Required by Variance
N=Not Injecting A=Temperature Anomaly Survey 0=Other(describe in notes)
W=Water D=Differential Temperature Test
Form 10-426(Revised 11/2012) MIT KRU 2W PAD SI 05-09-15.xIs
Ima~Project Well History File CoveJl~ge
XHVZE
This page identifies those items that were not scanned during the initial production scanning
phase. They are available in the original file, may be scanned during a special rescan activity or
are viewable by direct inspection of the file.
Organizing
RESCAN
_~' Well History File Identifier
DIGITAL DATA
OVERSIZED (Scannable)
[] Color items:
[] Diskettes, No.
Maps:
[] Grayscale items:
[] Poor Quality Originals:
[] Other:/~ 2
NOTES:
[] Other, No/Type
BY: ,~~REN VINCENT SHERYL MARIA LOWELL
[] Other items scannable by
large scanner
OVERSIZED (Non-Scannable)
Logs of various kinds
[] Other
Project Proofing
BY:
BEVERLY BR~SHERYL MARIA LOWELL
Scanning Preparation
x 30 = ..~__~__ +
BY: BEVERLY BREN VINCENT SHERYL MARIA LOWELL DATE; /S/
Production Scanning. ~~/ Stage 1 PAGE COUNT FROM SCANNED RLE:
PAGE COUNT MATCHES NUMBER IN SCANNIN PARATION: ~,~Eo NO
--
RESCANNEDBY: BEVERLY BREN VINCENT SHERYL MARIA LOWELL
General Notes or Comments about this file:
DATE: /S/
Quality Checked
• S
MEMORANDUM State of Alaska
Alaska Oil and Gas Conservation Commission
DATE: Friday, May 13, 2011
TO: Jim Regg 12 S 1 i I
P.I. Supervisor �l SUBJECT: Mechanical Integrity Tests
CONOCOPHILLIPS ALASKA INC
2W -16
FROM: Bob Noble KUPARUK RIV UNIT 2W -16
Petroleum Inspector
Src: Inspector
Reviewed By: :'pp�,
P.I. Supry ,10 i
NON - CONFIDENTIAL Comm
Well Name: KUPARUK RIV UNIT 2W - 16 API Well Number: 50 029 - 21255 - 00 - 00 Inspector Name: Bob Noble
Insp Num: mitRCN110511115113 Permit Number: 184 - 239 - Inspection Date: 5/8/2011
Rel Insp Num:
Packer Depth Pretest Initial 15 Min. 30 Min. 45 Min. 60 Min.
Well I zw -16 , Type In j T \ V TVD Sza IA 1200 j 2300 2230 T 2220
P.T.D 1842390 - !TypeTestI SPT Test psi I 2300 - OA 480 580 580 580
Interval 4YRTST p/F P Tubing 1600 1600 1600 L 1600
Notes:
I , re d -psi-- 6 5∎
�tp '1 9201
Friday, May 13, 2011 Page 1 of 1
.
.
MElVIORANDUM
State of Alaska
Alaska Oil and Gas Conservation Commission
TO:
Jim Regg
P.I. Supervisor
.~ ([¿.~; ¿, { ~ lei 7
i(!
DATE: Monday, May 21, 2007
FROM:
John Crisp
Petróleum Inspector
SUBJECT: Mechanical Integrity Tests
CO"OCOPHILUPS ALASK\ rNC
2W-16
KUPARUK RlV UNIT 2W-16
Src: Inspector
'}~q
\lQÙ(
NON-CONFIDENTIAL
Reviewed By:
P.I. Suprv~'
Comm
Permit Number:
184-239-0
Inspector Name: John Crisp
Inspection Date: 5/19/2007
Well Name: KUPARUK RIV UNIT 2W-16
Insp Num: mitJCr070521104338
Rei Insp N urn:
API Well Number: 50-029-21255-00-00
Depth
--- -~----, - --- . ------,~-- r--~
Well i 2W-I6 ¡TypeInj. i wI TVD , 5745 I IA '1250 1990 i
~:!:~L 184239_0!TypeTest L~~~ ¡T-~st ~~i i n_~J OA _~__~~
Interval 4YRTST P/F P ../ Tubing ¡ 2600 I 2500
Packer
Pretest
Initial
15 Min. 30 Min. 45 Min. 60 Min.
--¡-----
1930
1920
520
520
-------¡-
_.._"-~-_.__.-
.------
--
---------r-----------.....-.----
2500
2500
i~_~__
----~~--_.'"
-~--
Notes: .5 bbl pumped for test I did not request Operator to test IA with greater pressure than required by the State. No problems witnessed.
ßCANNED JUN 0 6 20D7
Monday, May 21, 2007
Page 1 of 1
MEMORANDUM
State of Alaska
Alaska Oil and Gas Conservation Commission
TO: Randy Ruedrich
Commissioner
P.I. Supervisor~'~'~,
DATE: July 12, 2003
FROM: John H. Spaulding
Petroleum Inspector
NON- CONFIDENTIAL
SUBJECT: Mechanical Integrity Tests
CPAI
2W
9. 10, 16
KRU
Kuparuk River Field
Packer Depth Pretest Initial 15 Min. 30 Min.
P.T.D.I 1842190 ITypetestl P ITestpsil 1422 I Casingl 1600 I 2050 I 20601 20601 P/F I P I
Notes:
I s i T.V.D.I.~ I Tubing 11500 11500 11500 11500 I Interval 4 I
WellI 2W-10 ITypelnj.I P ITestpsil 1436 I Casingl 1700 12200 12100 I 2080 I P/F I PI
P.T.D.I 1842230 IType test
Notes:
WellI 2W-16 ITypelnj. I G I T.V.D. [ 5475 I Tubingl378013775 13775 13775 I,nterva, I4
P.T.D.I 1842390 TypetestI P ITestpsil 1369 I casingl 1825 I 23501 2340 I 23401 P/F I P
Notes:
Well
P.T.D.
Notes:
Well
P.T.D.
Notes:
Type Inj.
Type test
IType Inj.
Type test
Type INJ. Fluid Codes
F = FRESH WATER INJ.
G = GAS I NJ.
S = SALT WATER INJ.
N = NOT INJECTING
Type Test
M= Annulus Monitoring
P= Standard Pressure Test
R= Internal Radioactive Tracer Survey
A= Temperature Anomaly Survey
D= Differential Temperature Test
Interval
I= Initial Test
4= Four Year Cycle
V= Required by Variance
W= Test during Workover
O= Other (describe in notes)
Test's Details
I traveled to Conoco/Phillips Alaska's KRU 2W pad to witness MIT's on the above wells. The pretest pressures were
monitored and found stable, the standard annulus pressure test was performed and meets the AOGCC criteria for a
successful MIT.
M.I.T.'s performed: _3 Number of Failures: 9 Total Time during tests: _3
Attachments: cc:
MIT report form
5/12/00 L.G. 2003-0712_M IT_KR U_2W- 16_js.xls 7/18/2003
ARCO Alaska, Inc.
Post Office I' 100360
Anchorage, A'l-~ka 99510-0360
Telephone 907 276 1215
January 16, 1985
Mr. C. V. Chatterton, Chairman
Alaska Oil and Gas Conservation Commission
3001 Porcupine Drive
Anchorage, AK 99501
Dear Mr. Chatterton:
Attached in duplicate are subsequent notices
following wells at the Kuparuk River Field:
Wel I Action Date Performed
on the
1L-1 Conversion
1L-7 Conversion
1Q-2 Conversion
1Q-7 Conversion
1Q-11 Conversion
1Q-13 Conversion
2B-5 Conversion
2B-9 Conversion
2C-1 Conversion
2C-3 Conversion
2C-6 Conversion
2C-8 Conversion
2D-2 Conversion
2D-7 Conversion
2D-11 Conversion
2D-14 Conversion
2F-1 Conversion
2F-2 Conversion
2F-13 Conversion
2F-14 Conversion
2G-3 Conversion
2G-3 Conversion
2G-5 Conversion
2G-7 Conversion
2G-10 Conversion
2~-12 Conversion
2G-16 Conversion
2U-3 Conversion
2U-4 Conversion
2U-7 Conversion
2U-16 Conversion
2W-2 Conversion
2W-4 Conversion
11/18/85
11/18/85
11/17/85
11/17/85
11/17/85
11/17/85
11/23/85
11/23/85
11/19/85
11/19185
11/19/85
11/19/85
11/20/85
11/20/85
11/20/85
11/20/85
11/21/85
11/21/85
11/2~/85
11121185
11/lq/85
11114185
11/14/85
11/14/85
11114185
11/14/85
11/14/85
RECEIVED
11/16/85 ,l.-.
11/16 / 85 JAN.2 Ot ll
11/16/85
11 / 1 5 / 8~ka Oil & Gas ~n~ ~Iss~or,
11 / 22 / 85 A~:hor~o~
ARCO Alaska, Inc. is a Subsidiary of AllanticRichfieldCompany
Mr.
C. V. Chatterton, Chairman
Well Action
Date Performed
Page 2
2W-5 Conversion
2W-8 Conversion
2W-10 Conversion
2W-14 Conversion
2W-16 Conversion
2X-2 Conversion
2X-4 Conversion
2X-5 Conversion
2Z-9 Conversion
2Z-11 Conversion
2Z-14 Conversion
2Z-16 Conversion
11/22/85
11/15/85
11/15/85
11/15/85
11/22/85
11/18/85
11/18/85
11/18/85
11/17/85
11117/85
11/17/85
11/17/85
if you have any questions, please call
T. M. Drumm
Kuparuk Operations Coordinator
TMD/kmc
Attachment (Duplicate)
me at 263-421 2.
STATE Of ALASKA
ALASKA OTL AND GAS CONSERVATION cO'~MISSION
SUNDRY NOTICES AND REPORTS ON WELLS
1. DRILLING WELL [] COMPLETED WELL I~ OTHER []
2. Name of Operator 7. Per~g N~_.3 9
ARCO ALASKA, INC. -_
3, Address
P O BOX 1 00360 ANCHORAGE ALASKA 9951 0 8. APl I~T~e_r 21 255
· ' ' ' 50--
717' FNL, 31' FWL, Sec. 34, 9'un~t0jr~a!~eLl~m~lVER UNIT
4. Location of Well
SURFACE LOCATION'
T12N, RgE, UM
5. Elevation in feet (indicate KB, DF, etc.)
95' (RKB)
6. Lease Designation and Serial No.
ADL 25642, ALK 257:3
~""i~'0~dk RIVER FIELD
KtJPARUK RIVER O I L
POOL
12.
Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data
NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF:
(Submit in Triplicate) (Submit in Duplicate)
Perforate [] Alter Casing [] Perforations [] Altering Casing []
Stim u late [] Abandon [] Stimulation [] Aba ndonment [~,
Repair Well [] Change Plans [] Repairs Made [] Other
Pull Tubing [] Other [] Pulling Tubing []
(Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.)
13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any
proposed work, for Abandonment see 20 AAC 25.105-170).
On November 22, 1985 Kuparuk well 2W-16 was converted
producer to a water injector well as part of the full
waterflood conversion effort. Water is being injected
"A" and "C" sands.
from a
field
into
both the
RECEIVED
2 0 i98S
AlasKa Oil & Gas Cons.
'~. i-.,. r',~'~0 K.q ~:~
14. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Date 1 2 / 1 8 1 8 5
Signed -~-/~'~ ~L:~,/f~--~'~"r-.-'~ Title KUPARUK
The space below for Commission use
OPERATIONS COORDINATOR
Conditions of Approval, if any:
Approved by
By Order of
COMMISSIONER the Commission
Date
Form 10-403
Rev. 7-1-80
Submit "Intentions" in Triplicate
and "Subsequent Reports" in Duplicate
ARCO Alaska, Inc.
Post Office ' 100360
Anchorage, ~A'r~ska 99510-0360
Telephone 907 276 1215
DATE: 11-13-85
TRANSMITTAL NO: 5443
RETURN TO:
ARCO ALASKA, INC.
KUPARUK OPERATIONS ENGINEERING
RECORDS CLERK
ATO- ll15B
P.O. BOX 100360
ANCHORAGE, AK 99510
TRANSMITTED
RECEIPT AND
FINAL PRINTS/
--.2,/
HEPd-~IWITH ARE THE FOLLOWING ITEMS. PLEASE
RETURN ONE SIGNED COPY OF THIS TRANSMITTAL.
SCHL/ OPEN HOLE/ ONE * OF EACH
DIL/SFL-GR
DIL/SFL-GR
LDT/NEU-GR PORO
LDT/NEU-GR PORO
LDT/NEU-GR RAW
RAW
01-28-85 RUN #1
01-28-85 RUN
01-28-85 RUN #1
01-28-85 RUN
01-28-85 RUN
01-28-85 RUN
01-29-85 RUN
01-29-85 RUN #1
01-29-85 RUN
01-28-85 RUN
-.
ACKNOWLEDGE
3160-7009
3160-7009
3160-6983
3160-6983
3160-6983
3160-6983
3169-7011
3169-7011
6550-6950
3160-6938
3J-8
5.W? DIL/SFL-GR
s
",5
DEN/NEU
k, 2"~' DEN/NEU
~"5 "'"" DEN/NEU
~2~EN/NEO
~YBE~OOE
PORO
PO RO
RAW
RAW
10-16-85 RUN ~1
10-16-85 RUN 91
10-16-85 RUN 91
10-16-85 RUN #1
10-16~85 RUN #1
10-16-85 RUN 91
10-16-85 RUN 91
3530-7312
3530-7312
6500-7287
6500-7287
6500-7287
6500-7287
6500-7287
i RECEIPT ACKNOWLEDGED:
BPAE DRILLING*BL
B. CURRIER L. JOHNSTON
CHEVRON MOB I L
D & M*BL NSK CLERK*BL
DISTRIBUTION:
W. PASHER
EXXON
PHILLIPS OIL
J. RATHMELL*BL
~ Alaska STATE OF
SOHIO
UNION
VAULT/~O* FILMS
ARCO Alaska. Inc. is a SuDsidtary of AtlanticRichlieldCompan)'
ARCO Alaska, Inc
Post Offic~...~x 100360
Anchorage, Alaska 99510-0360
Telephone 907 276 1215
September 20, 1985
Mr. L. C. Smith
Alaska Oil and Gas Conservation Commission
3001' Porcupine Street ~
Anchorage, AK 99501
Dear L. C. Smith:
Per our conversation on September 4, 1985, ARCO Alaska,
Inc. proposes to convert 110 production wells to water
injection to implement fullfield waterflood of the-
.Kuparuk River Unit.
As discussed a single "blanket" sundry notice (form
10-403) has been completed for all well proposed to be
converted to water injection. Individual subsequent
sundry notices will be filed when the actual well
conversions occur.
As stated in form 10-403, well conversion to water
injection will occur in two primary stages. The first
stage will convert approximately four wells per
drillsite to achieve a nine-spot pattern. First stage
conversions are expected to be completed by
approximately 10/15/85, prior to waterflood startup.
The second stage of conversions will convert
approximately four additional wells per drillsite to
achieve a line drive pattern. Second stage, conversions
are expected to be completed mid-December to January
1986.
I would like to express my thanks and appreciation to
the Commission in working with ARCO Alaska, Inc. in
this area. If you have any questions please call me at
263-4212.
Sincerely,
T. M. Drumm
Kuparuk Operations Coordinator
cc: J.F. 'Beall
TMD:ps:013
R ECE VED
SEP.--o o 1985
AnChor~.ge
ARCO Alaska, Inc. is a Subsidiary of AtlanticRichfieldCompany
STATE OF ALASKA
ALASK! 'IL AND GAS CONSERVATION C 4MISSION
SUNDRYNOTICES AND REPORT ON WELLS
1. DRILLING WELL[]
COMPLETED WELL
OTHER []
2. Name of Operator 7. Permit No.
ARCO Alaska, Inc. see attached
3. Address . 8. APl Number
P.O. Box 100360, Anchorage, AlaSka 99510 so- see attached
4. Location of Well
N/^
5. Elevation in feet (indicate KB, DF, etc.)
6. Lease Designation and Serial No.
see attached
9. Unit or Lease Name
Kuparuk River Unit
10. Well Number-
see attached
11. Field and Pool
Kuparuk River Field
Kuparuk River Oil Pool
12.
Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data
NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF:
(Submit in Triplicate) (Submit in Duplicate)
Perforate [] Alter Casing [] Perforations [] Altering Casing []
Stimulate [] Abandon [] Stimulation [] Abandonment []
Repair Well [] Change Plans [] Repairs Made [] Other []
Pull Tubing . [] Other X~ Pulling Tubing []
(Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.)
13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any
proposed work, for Abandonment see 20 AAC 25.105-170).
Pursuant to form 10-403, it is proposed that the attached list of<,A/~roducing
wells in the Kuparuk River Field be converted to water injection. The conversion will
occur in two stages. The first conversion: to a nine-spot pattern will occur
approximately 10/15/85. The second conversion to a line drive pattern will occur
approximately 12/15/85. Injection will be into the A and C sands.
R£CE V£D
SEp2019B5
Gas Cons. Gomm~ss'~on
Anchorage
14. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Signed ~, /~"~ ~~'~''t~t'~'''~ Title l<uparuk Operations Coordinator D~te
The space below for Commission use
9/18/85
Conditions of Approval, if any:
Form 10-403
Rev. 7-1-80
~'pproved Copy
~,eturr~d /
By Order of
COMMISSIONER the Commission Date
Submit "Intentions" in Triplicate
and "Subsequent Reports" in Duplicate
-1
-1
-1
2X- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
2Z- 2
3
6
8
9
11
14
16
223
237
239
83- 84
103'
109
118
107
110
113
114
83- 80
85
77
38
85-138
107
109
029-2
2
2
2
2
2
029-2
2
029-2
-2
2
2
2
2
2
21363
1239
1253
1255
0963
0982
0987
0995
0985
0988
0991
0992
0960
0964
0957
0924
1377
1379
1361
I!
I!
!!
25645
I!
25645
25653
25646
25653
I!
25646
2576
2576
2579
2577
2579
2577
10
10
12
10
12
10
12
12
10
12
10
/15195
/15185
115185
115185
/15185
115185
/15/85
115185
115185
/15/85
115185
10115/85
10115/85
lO/15/86
lO/15/85
12/15/85
12/15/85
12/15/85
12/15/85
MARK:0093
RECEIVED
SE? 2 0
Aiasks Oil & Gas Cons. Commtssmr~
Anchorace
ARCO Alaska, Inc. ,~..~
Post Office Box 100360
Anchorage, Alaska 99510-0360
Telephone 907 276 1215
DATE: 08-0 8-85
TRANSHITTAL NO: 5285
'_RETURN TO:
ARCO ALASKA, INC.
KUPAkUK OPERATIONS ENGINEEkING
~E CO~JJS CLEkK
ATO-1115B
P.O. BOX 100360
ANCHORAGE, AK 99510
fRANSMITTED HI..'RE~ITH ARE
qECEIPT AND RETURN ONE S
BOX 1 OF 2:
3PEN H~OLE LIS TAPES PLUS LIS
3C-11 06-23.-85 RUN #1
3C-10'" 07-02-85 RUN $1
3C-9 ~' 07-10-85 }{UN #1
~C-7~ 07-31-85 RUN #1
3B-14- 03-20-85 RUN #2
3B-12' 07-03-85 RUN 91
3B-11~ 06-26-85 RUN 91
3B-10' 06-17-85 RUN #1
3 B- 9"" 06-10-85 RUN 91
2Z-15" 06-19-85 RUN #1
2Z-14/ 06-28-85 RUN #1
~Z-13~ 07-05-85 RUN #1
2Z-12~ 07-20-85 KUN #1
!Z-11,~ 07-27-85 IiUN #1
THE FOLLOWING IT}~S. ACK/~O~LEDGE
IGNED COPY OF THIS TRANSMITTAL.
'~'INGS (ONE COPY OF
4427.5-8881.5 REF
1785.0-8987.5 t<EF
3920.0-8332.5 REF
4617.5-8747.5 ~{EF
3280.0-6~03.5 REF
4021.5-8261.5 REF
2190.5-9257.0 REF
3273.0-7270.5 EEF
2~92.0-8415.0 REF
2658.0-6620.0 REF
3876.0-8334.0 REF
4180.0-8538.5 REF
4409.0-9412.5 REF
3531.5-7534.0 i{EF
EACH)
970597
#70620
970642
970706
#70229
#70641
970598
#70555
970634
#70562
970600
#70639
970661
#70704
iN SOX 2 OF 2:
!PilN__HOLE LIS TAPES PLUS
:w-167~' 01-28-85 RUN #
~V-14'/ 05-16-85 RUN #
':V-12~/ 04-22-85 RUN #
.U-10~ 04-11'-85 RUN #
U-7~,~ 03-19-85 RUN #
A-13/~ 07-16-85 RUN #
R-13'~ 07-27-85 kUN #
_R-12 ~ 07-20-85 RUN ~
.R-11'~-' 07-13-85 RUN ~
R-10~''~ 07-06-~5 RUN #
R-9// 06-28-85 RUN #
'R-7/x 06-04-~ b RUN 9
LISTINGS (ONE C~PY OF
1 3116.0-7038.5 REF
1 3047.0-7086.5 I{EF
1 3960.0-9265.0 REF
1 2972.0-7063.0 I<EF
1 3594. b-8179.5 I~EF
1 7649.5-8160.0 I<~F
1 3940.0-8578.0 REF
1 3935.0-8277.5 KEF
1 3810.0-7213.5 i{EF
1 2991.0-8738.0 I{EF
1 3991.5-8131.0 REF
l&3 0045.5-7103.0 kEF
ECEIPT ACKNO~LEDGED:
?AE
. CURRIER
~EVRON
DRILLING
L. JOHNSTON
HOBIL
NSK CLERK
DISTKIBUTION:
W. PASHER
EXXON
PHILLIPS OIL
J. RATHMELL
EACh)
#70436---F. EVISED
# 70614---tlEVIS£D
# 70613---P~VISED
# 70612---P~EVI ~ED
#70505---F~VISED--'
#70645
#70702
970660
#70643
#70640
#70601
~70509
DATE: ~-.i~,o~;- 0;" ~. ~-..': ~ Cons. Commission
OF ALASKA*-~ ~'~
STATE
SOHIO
UNION
K.TULiN/VAULT
~ STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
3001 Porcupine Drive
Anchorage, Alaska 99501
(907) 279-1433
TO:
Stat~ b~ A]asl--3.
Alaska Oi] and Gas ConservaUon Commfss~on
~,,,~ ~orc.])~e Drive
Aneboraze, A]ask-a 93501
RE:
Receipt of the following material which was
transmitted via
is hereby.acknowledged:
~UANTITY
DE S CRI PT ION
DATED:
Copy sent
YES
to
sender
NO ~J
STATE OF ALASKA
ALASKA ~riL AND GAS CONSERVATION C0~n~iSSION
3001 Porcupine Drive
Anchorage, Alaska 99501
(907) 279-1433
TO: State o.r Alaska
Alas-la O: and Gas Conservation Commission
3001 Porcupine Drive
.~nchorage, Alaska
Receipt of
the following material
/,/~: /
RE:
/ .~-
~hiCh ~as transmitted via is hereby ac~o~ledged:
qUANTITY
/~.
DE S CRI PT 1 ON
·
//
RECEIV--D:
DATED:
Copy sent to sender
YES ~0 .>'-
ARCO Alaska. Inc. ~
Post Office Box ', .i0
Anchorage. Alasi~a''j~g510
Telephone 907 276 1215
November 14, 1984
Mrs. Elaine Johnson
State of Alaska
Alaska Oil & Gas Conservation-
Commission
3001 Porcupine Drive-
Anchorage, AK 99501
SLIBJECT: Conductor As-Built Location Plats - 2W Pad Wells 1-8, 9-16
Dear Elaine:
.
Enclosed are as-built location plats for the subject .wells.
you have any questions, please call me at 263-4944. .
,
Sincerely,
Gruber
Associate Engineer
,,
JG/tw
.GRU2/L93
Enclosures
If
o.
0 !
,~.1~.~ ~,, ~, G~s Cons, Commission
Anchorage
ARCO Alaska. Inc. II a Subsidiary of AtlmnllcRicllllaldComDmny
PHASE 33; AS-BUILT
WELLS 9 Thru i 2s
27
34
/
-PHASE l' AS-BUILT
WELLS I Thru 8
(NSK 9.05.22:~dl)
LOCATED IN PROTRACTED SECTIONS :53 & 34
TOWNSHIP 12_ N., RANGE 9 E.,.,.UMIAT MER.
NO SCALE
NOTE-
BASIS OF POSITION IS MONUMENTATION
2W' NORTH AND :P_W SOUTH PER LHD 8~
ASSOCIATES.
ELL g Y - 5.gTg,~83.85 L4T. 70021,23.3283
X . 518,782.81 LOI&. 1~g050'50.88~?.
PID EL£V. ~3.! O.&. EL£¥.
30& FEL 57g F~ SEC. 33
WELL [0 Y - 5.980.~39.~g LAT. 7002['23.8830"
X . 518.805.0g LONG.
MD ELEV. ~3.~ O.G. ELE¥.
2~! FEL 523 FNL SEC. 33
WELL ~! I , 5.980.095.05 LAT. 70°21~2~.~288,,
X - ~18.~27.6! LONG. [~g°50'~g.5~OB-
PAD £L£V. 53.a 0.~. EL£V. 50.2
~58 FEL ~88 FNL SEC. 33
.
~ELL 12 Y - 5.gOO, lSOJ70 LAT. 7Go21'2~.gT57,
X - 518,850.03 LONG.
PAD ELEV. 53.~ 0.G. EL£V.
235 FEL ~12 FNL SEC. 33
-.
~ELL 13 Y - 5.980.31E.~5 LAT. 70~21,23.63BG,,
X - 519,183.71 LONG. 1~g~50'3~.1355,,
P~O ELEV. 52.7 0.~. ELEV. 57.7
98 FWL 5k8 FML SEC.
WELL t~ ¥ - 5,979,g60.0§ LAT.
x - 5.g,~St..! LONG. I~g~5~'39.7~6,,
PAD ELEV. 62.9 0.~. ELE~. 57.7
WELL 15 Y - 5.g79,~0~.~8 L~T. 7g°21,22.E~67.,
PAO ELEV. ~3.0 O.S. [LEV. 58.0
~2 FWL 5~ FUL SEC.
WELL 15 ¥ - 5og79.8~8.$~- LAT.
I , 5[g,1!6.25 LONG. 1Gg°50'~i.[200
PAD ELEV. 52.g 0.G. EL£V.
29 FWL 71S FNL
RECEIVED
AUG o ! !985
ka Oil & Gus C~:ns "-~-- ,~o,-,,
L ..... rP,,,.,o h.,.
Anch:,r~.:~.
THIS ~RVEYK~~ Il '~
,:,RE C.~F-RECT ~,S Of OCTOBER 14, 1984.
Dote
Or~wn ~v'
ARCO Alaska, Inc.
C'ro)ec+ ~JOrth SloDe ~.r,il-~
DRILL SITE 2W
CONDUCTOR AS-BUILT
LOCATIONS
Oct. 23, 1984 t $co~e AS SHOWN
LICENSED. -"'~ F~R~-C'ICE LJ, ND gUF, VF¥'NG IN THE STATE OF
UNDER MY 2~RECT SU~CRViGION ~r;[ THAT ~LL DETAILS
ALASKA OIL AND CAS CONSERVATION.COMMISSION .
Bill Sheffield, Governor
3001 PORCUPINE DRIVE
ANCHORAGE,ALASKA 99501.1-31'0:S
TELEPflONE(O07) 270,'-1433
Loc ~
' / / - .
Pemit No. ~ ~.~q
..
~e ~tsh to b:tng to you: attention that the
yet reeefved the follow~ng required ~tems on the 8u~ct. well'
whfch our record, fndfeated wa~ completed ~[~,~
Article 536(b) of Title 20, Chapter 25, Alaska Administrative
Code,. stipulates that this material shall be filed within 30 days
after completion of a drilled.well.
Please submit the above missing material.
erelx ~ / 7 ....
C. V. Chatteruon/
Chairman
lc':C.024
ARCO Alaska, Inc.
Post Office Bo'x--f00360
Anchorage, Alaska 99510-0360
Telephone 907 276 1215
June 20, 1985
Mr. C. V. Chatterton
Commissioner
State of Alaska
Alaska Oil & Gas Conservation
Commission
3001 Porcupine Drive
Anchorage, AK 99501
SUBJECT: 2W-16
Dear Mr. Chatterton:
Enclosed is a copy of the 2W-16 Well History (completion details)
to include with the Well Completion Report dated 03/18/85.
If you have any questions, please call me at 263-4944.
Sincerely,
~J. Gruber
Associate Engineer
JG/tw
GRU9/L95
Enclosure
ARCO Alaska, Inc. is a Subsidiary of AtlanticRichfieldCompany
ARCO Alaska, Inc.~
Post Office ~J~"'6x 100360
Anchorage, Alaska 99510-0360
Telephone 907 276 1215
I:~ E'I'JJ F4N TO:
T R A N SM I T T r.[ I)
RECEIPT AND
ARC(] AI...A.S'I<A, INC,
ATTN: i:~ECOI:~I)S CLERK
A'¥' O- 'i I ~ 5 B
I::',0, BOX t00360
ANCIqOIki~gE, Al< 995t0
I"II.~:I:{E~]:'I'I"I '¢.~RIF THE I::OI...L[)WI
1:4F TUi:(N ONE
DATE: 05-.. (.) 7- B':'~
TI:(ANSI'~IT'f'AL N0:5t78
F:' I N ~."~ L I::' R I N
CBL.' S / $"C H L. UM L~ EL'~G EI:~
I Tlii:~$, l::'L.r-i;A SE ¢~CI(NOWLED[;E:
SIC;NED COPY 01:' THIS TI~AN,~"MITT~L.,
t E-t 5-% t 0'"'30-8':~ RUN ~t ?300-789'5
2C-t 3 '"'" 02--0~"J:]5 RUN -,,-,...) 5"500" 726':~
,-.. C-- t 4'-' .... ,..~,.'" ','~ ,..~ "' O' ,..'./' _.,.,° 5 RUN :~:'~,,'_ 3800-6030
2C--t 5 / 02--0S--85 I:~UN :',~:t 5450--7t 20
2C-t6 02-0'8-85 RUN ~:t 7t75'"8280
2(;-'t 5 ¢ I 0--2'?-'84 RtJN :~'t 47<?0"68cj2
:i!g-16 ~ t0-27-84 RtJN :~:1 '5650-7736
:~!t.]-t 5 ~/ 02-'t 0-1.']5 RtJN :J',:t 6400-6985
...."~'-9 ~ 0t-0t-85 RUN '~:t 5700"'
") W-' t t I./ 0 t -- 0 ') '~" ~': ':.)"4 4
.-_ .'..-'o.~ I:;:UN :,",: t ,_,.. 66-66 O
;:?.t~-t...:~'"' (')t -02-85.. RUN :.".: 'i ,,-_
'..').kl-t 6'~'' 0°-0t._ , -85 I";:UN '.- .... t 'q. 3(']6-,'f)9~J
2X-t 4'''~'' t t -t '/'-84 RUi',I "~:t 4396-7874
_-
I:~ECE ]' F'T A C I'-.'. N 0 W I.. E I," G E"' D:
.............. ii;!ii ¥ i;i ii 5f ..........
B F' A E: ~ D F;; I I I.. I f',~ (; .... B I... W, F' (-.~ S I' I F-.' J:~
E;, Ct. JR,r';,'IF"'I:;: L,. ,J(!I"IN.g"f'ON lii:XXCJN'
C I"1E" V R 0 N M 0 ):':~ 71 I F' I'-I :[ I_ I_ I I::'.t,' 0 1 L
I) & M ~(' N :? I( '.::: L I"::1:;: I< '-' ~{I .... !. R A T 1"1M Ii" L L
DA'I'E:
-x-~"I'ATE JiF AL~I~:/~L
,S'OH I 0
UNION
· x~K. TULI N/VAULT--F I LM
ARCO Alaska, Inc,
Post Office Box 100360
Anchorage, Alaska 99510-0360
Telephone 907 276 1215
'~:ETURN TO'
ARCO AI...A£1( ;~,,
ATTN:
A '1"(.]- t I t 51-~
F:'.[), BOX 100360
A1J. CI.-IOF(,q[;[-", i;tl( 99D1 0
i-I:;:AN~M ~' TTEI) Hl:..-.F;,'r:i]~ 11'1-1 ~-~
':IECIEIr-:'T ~N]D F,'ETUr-;~N ONE
'I F:' I::'. N HOLE" I_.I~' T~F'ES F"I...
':'CHLUNBEIR~ER (ONE CO
t (~-'3 / 03-30-[15 F;:I.JN
.~t.J '- 8 0 S '- 2 8 '-' [:l 5 R [.J N
.}LJ-9u''''''0,1 - 0 4-',~i!_5
3H-t 6~ 0t -.2,q. -11~5 RUN
9E{--' t /,/ 04- t ,~-',515 RUN
_)B-J 5"~ 03-'''~° "~':: -.
-~B-t 6/ 0,1- ii6- 85 [;:UN
· )-:'... -~. ;,. -- ."' .E GE
F:I!.--. THE F'OI_[_OH]ZNG ITEfi..? r-I E¢iS'E ACI~NOIJ/EI
,~I(;N[-~I) CO.F'Y OF TH.i'5' 'TR~qN~MITT~I_,
U,.? I... 15'1' I N [5
I::' Y O I-- I:.,-~ U H )
.CETF'T G C I< N C) U I._ .r:] I) (;. E" I)'
................ i5 ':i' 5! i.'-i Ei :i: ':l T .........
'P-,E F.,I.::II.. ! IN(.; W. F',q£1-.IER
CLJF;;RIER I .... !:.)HN,~T(]N EXXON
:IE V F: 0 Iq I'i 0 [7; 'r ! F' I..1 ~. 1... I... 7. F' 2- (.') ]i L
& H ~l.f",'l,', "L. EJF:;I( ,I, I:;:~-;-HHEI..L
I) i:, 'r E '
SC'iH ]: O
t.J I,~ :[ ()
I( ~ TUI...l: i'-I / V ft-'~ UL.T
Bill Sheffield, Governor
lll$1l OIL A~tD t;l$ ~,O~i$~ll/lllO~f.~,Offffffl$$101 soo~ ~,o,(~U~,~UE ~n~Vt
·
AI%ICIt OFI~,CI I:, A LAll KA
·
lie wi~h to bring to your at~ention that tPe Commission has not-'
yet received the following required items on the subJee~ w_.ell
~l~lch our records fndieated was eompleted_/~/-~---~],
Article 536(b) of Title 20, Chapter 25, Alaska Administrative
Code, stipulates that this material shall be filed within 30 days
after completion of a drilled.well.
Please ~ubmi~ ~he above m/~lng material.
Chairman
·
·
·
lc~0.024
ARCO Alaska, Inc.
Post Offi~ lox 100360
Anchorage, Alaska 99510-0360
Telephone 907 276 1215
DA-I"E' APRIL 22,
TRANSMITTAL NO-
i 985
._,i 4
:;:ETURN TO'
ARCO ALASI<A: INC~
ATTN' RIT. C. Or-;~DS; [.'.I_ERI<
ATO---i I t
F'. 0. ,E: 0 X i 00 .:.'.". 6 ~..".:'
ANCI-.!ORA(::.E, Al< <9!?.':']t (-.:)
'f' I";; .'-':-; i".! S'. H .'[ 'f' T E
F; i;.'-. C; E ]; F' 7' r':', i'-!
:.:E~CE ~ F'T
I.-I E; [.;: r:.-: !....! ]; T H AI--,:E THE' F'OI._!..C. JU];i'-!6 ITEH:-';.,.. PI_EASE ACI<NOI.,.JL_EDC,,E
F.:E;'f'~r:..:i'.! ONF." ,.,'7.,T.:.,t'-,ED F;OF:'Y OF -r'l-II~
"'OE/INTEF,:HITTENT LIFT F'Rr:''''''' "'-
.: ,=,; ,_, Ur', ~. SURVEY
,':TO:F../F'F,'OD I._(..'](.; & ' A' S'-AND F'BLJ
.";'nF'-,"F'P.I ! ..... ( I:N];TIA[_, F'F.'.ES'£'LIRE )
,?OE/F'BU
£OE/F'BU
.? 0 E / F' B U
'"C~IE,/' C' '"' "'i".~:...'q F' ['.:, II
,.3 : .'- I'1 _
CrqE/;'BI..IP - 'A' & 'C' ~AND~
r.'.._ ·
,.,¢T~TZC BHP DAT~
,S'TATZC RHP D~T~
STATI:C f{I-.IP DAT~
£TATIC F;HP DAT~
~TATIC BHP ~ATA
STATIC BHF' ~ATA
,..?TATIC BHF' ~¢*iTA
~TA¥**[C F,'HF' ~lqTA
~'T'AT.T.C BHP ~T~
F, ~.*~ r- [,~ ~.i I .,'.-i
C" T',
STATIC BHP DATA
,:?T;-~T:[C BHP DATA
S'TA~I'-', ..., ,_,,~-'~'-'~-':-',, [.:~-.~TA
-- ..:' I '1 i ' ...
STATIC FJFIF' DATA
~,T~::,TIC BlIP DATA
STATIC BHF' r,,-.
t: ,--,TA
S!'ATiC .E¢IlP D~TA
p 14 ..'
£TATIC .... F D ~ T ;-':-;
DISTRIBUTION -
DRILLING W~ F'ASHER
L · !r2.' u ~'.' '." T nx~
.: ... I I1~,~~ I _,~. . .
HOE:IL F'I~I I LLI F'£' OIL
N '.,: K r ,, ,.
_ LEF;I-... J F;ATHHF'LL
4/6-7/85
.3/t t/85 ,.
2/26/85
¥12185
o/~,/85
S/4/85
3/t 8/85
t/24/85
t/24/8D,
,313185
312/85
.3/2/85
~/2/~
3/t o ,-,
~/f 9/85
I 12~ /o~
S/23/~,~
3/24,/°5~,
~;,/~/85
f /n,t/~
t/25/~
~/D~
t/2J- -~
I
t/f
t/n4/85~
t/2~,/~,
i /~)~
RECEIVED
APR 2 5 1985
Alaska 0il & Gas Cons.
· __ Anch°ra2~
E ~F: AL
l 0 N
T~LT~
ARCO Alaska, Inc. Is a Subsidiary of AtlanticRichfieldCompany
ARCO Alaska, Inc.
Post Office Box 100360
Anchorage, Alaska 99510-0360
Telephone 907 276 1215
April 2, 1985
Mr. C. V. Chatterton
Commi ssi oner
State of Alaska
Alaska Oil & Gas Conservation
Commi ss ion
3001 Porcupine Drive
Anchorage, AK 99501
SUBJECT: 2W-16
Dear Mr. Chatterton'
Enclosed is a copy of the 2W-16 Well History to include with the
Well Completion Report, dated 03/18/85. If you have any
questions, please call me at 263-4944.
Sincerely,
O. Gruber
Associate Engineer
JG/tw
GRU5/L81
Enclosure
xc: 2W-16 Well File
RECEIVED
APR
Alaska 0ii & Gas Cons, Comm[ssi0n
Anchorag~
ARCO Alaska, Inc. is a Subsidiary of AtlanticRichfieldCompany
n-~;-- -. ', '~;'~ '" '. · . ·. · ;;~'-9,-L-'~'~.,?'-
. w.,.. -; . . - ' ' ;; " *" '";' 'Post'~ ' O~[~ce' a~-' ' : ' ' f :~*':'-" '"~"" ' ' '"'
. ~ '': ~7Lc ':" AnChorage,'AlaSka;9~510 1'-'
,'- (~ ~ . · Telephone 907 277 5637.
_ _._ ... · .... ·
.. ....__ .
F<E'f'L!F;~.FL'I'[): ,SF:CO' P, LASI<t~', INC
,-",TTN' RECORDS' CLEF:i<~-
ATo-t t t SB ,
.F'. 0 ,, !:~ 0 X t 0 0 ?.;,:', ~D .
P, HCI'iOIriAGE, ~1< ??I~i 0
i'I ]: i':'T E: I) ~ .... : T , , l_ ,
- I I~.F<[_I~,TI--I ~-,RE I i..,E: FO[ [ OU
'R'ECE]:F'T ,qi'.~D.RETURN ONE S]:(:HEI) COF'Y
. . .
'FRit~i'-!.S'H:~TTP~L N(3.;5i.'")9
· .
..
ARCO Alaska, Inc.
Post Office B~"~100360
Anchorage, Alaska 99510-0360
Telephone 907 276 1215
March 20, !985
Mr. C. V. Chatterton
Commi s s i oner
State of Alaska
Alaska Oil & Gas Conservation
Commi ss i on
3001 Porcupine Drive
Anchorage, AK 99501
SUBJECT: 2W-16
Dear Mr. Chatterton:
Enclosed are the Well Completion Report and gyroscopic survey for
the subject well. I have not received the the 2W-16 Well
History. When I do, I will forward a copy to you.
If you have any questions, please call me at 263-4944.
Sincerely,
Gruber
Associate Engineer
JG/tw
GRU5/L36
Enclosures
RECEIVED
IAR 2 6 1985
Alaska 0ii & Gas Cons, Commission
Anchorage
ARCO Alaska, Inc. is a Subsidiary of AtlanticRichfieldCompany
~ . STATE OF ALASKA
ALASKA ~_~ AND GAS CONSERVATION CO,,._~ISSION
WELL COMPLETION OR RECOMPLETION REPORT AND LOG
1. Status of Well Classification of Service Well
OIL E~x GAS [-I SUSPENDED [] ABANDONED [] SERVICE []
2. Name of Operator 7. Permit Number
ARCO Alaska, Inc. 84-239
3. Address 8. APl Number
P. 0. Box 100360, Anchorage, AK 99510 50- 029-21255
4. Location of well at surface 9. Unit or Lease Name
715' FNL, 29' FWL, Sec.34, T12N, R9E, UM ~rLOCATiONS'[ Kuparuk River Unit
At Top Producing Interval VF~iFIFD ] 10. Well Number
1232' FSL, 1466' FWL, 5ec.27, T12N, R9E, UN ~Surf. ~- i~ 2W-16
At Total Depth !~. H. f'/'- i 11. Field and Pool
1453' FSL, 1629' FWL, Sec. 27, T12N, RgE, UPI Kuparuk River Field
5. Elevation in feet (indicate KB, DF, etc.) 6. Lease Designation and Serial No. Kuparuk River 0il Pool
93' RKB ADL 25642 ALK 2573
12. Date Spudded 13. Date T.D. Reached 14. Date Comp., Susp. or Aband. 1 §. Water Depth, if offshore 116. No. of Completions
01/24/85 01/28/85 01/30/85* N/A feet MSLI 1
17. Total Depth (MD+TVD) 18.PlugBackDepth(MD+TVD) 19. Directional Survey I 20. Depth where SSSV set I 21.Thickness of Permafrost
7122'MD,6314'TVD 6994'MD,6203'TVD YES ~ NO [] 1887 feet MD 14507 (Approx)
22. Type Electric or Other Logs Run
DIL/SP/SFL/Microlog/GR/Cal, LDT/CNL, FDC/GR, Gyro (GCT)
23. CASING, LINER AND CEMENTING RECORD
SETTING DEPTH MD
CASING SIZE WT. PER FT. GRADE TOP BOTTOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED
16" 62.5# H-40 Surf 93' 24" 248 sx Cold Set II
9-5/8" 36.0# J-55 Surf 3160' 12-1/4" 700 sx AS Ill & 440 sx Class G
7" 26.0# J-55 Surf 7084' 8-1/2" 359 sx Class G
24. Perforations open to Production (MD+TVD of Top and Bottom and 25. TUBING RECORD
interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD)
6786' - 6780' 3-1/2" 6721' 6443' & 6700'
6802' - 6790' w/4 spf, 120° phasing
6822' - 6812' 26. ACID, FRACTURE, CEMENT SOUEEZE, ETC.
DEPTH INTERVAL (MD) AMOUNT& KIND OF MATERIAL USED
6654' - 6600' N/A
6668' - 6663' w/12 spf, 120° phasing
27. N/A PRODUCTION TEST
Date First Production Method of Operation (Flowing, gas lift, etc.)
Date of Test Hours Tested PRODUCTION FOR IOIL-BBL GAS-MCF WATER-BBL CHOKE SIZE IGAS-OILRATIO
TEST PERIOD II~
Flow Tubing Casing Pressure CALCULATED,~ OIL:BBL GAS-MGF WATER-BBL OIL GRAVITY-APl (corr)
Press. 24-HOUR RATE i~
28. CORE DATA
Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips.
NoneRECEIVED
2 6 198
Alaska Oil & Gas Cons. Commission
Anchorage
Form 10-407 * NOTE: Tubing was run and the well perforated 02/24/85. GRU5/WC11 Submit in duplicate
Rev. 7-1-80 CONTINUED ON REVERSE SIDE
29. i~":' .' ..... ""~' ' .... ~' '~'"-' "~'~' ~" '"~: .......... ~ ..... ~'~
· '"' :'! :::-' _. .
.. .
.
-.
NAME Include interval tested, pressure data, all fluids recovered and gravity,
MEAS. DEPTH TRUE VERT. DEPTH GOR, and time of eacti phase.
·
Top Upper Sand 6600' 5871' N/A
Base Upper Sand 665.5' 5916, .-
Top Lower Sand 6763' 6005'
Base Lower Sand 6903' 6124'
:
.
·
:
31. LIST OF ATTACHMENTS
r~ ........ ':" ¢ ........ /') copies) '
32. I hereby certify that the foregoing is true and correct to the best of my knowledge
Signed ~ i~~ .~L,~~ Title Associate Engineer Date
INSTRUCTIONS
General' This form is designed for submitting a complete and correct well completion report and log on
all types of lands and leases in Alaska.
Item 1' Classification of Service Wells' Gas injection, water injection, steam injection, air injection, salt
water disposal, water supply for injection, observation, injection for in-situ combustion.
Item 5' Indicate which elevation is used as reference (where not otherwise shown) for depth measurements
given in other spaces on this form and in any attachments.
Item 16 and 24: If this well is completed for separate production from more than one interval (multiple
completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported
in item 27. Submit a separate form for each additional interval to be separately produced, showing the
data pertinent to such interval.
Item 21' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.).
Item 23' Attached supplemental records for this well should show the details of any multiple stage cement-
lng and the location of the cementing tool.
Item 27: Method of Operation' Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In-
jection, Gas Injection, Shut-in, Other-explain.
Item 28' If no cores taken, indicate "none".
Form 10-407
A~RCO Oil and Gas Company ~,
Daily Well"-'HistorY- Final Report
Instructions: Prepare and submit the "Final Report" on the first Wednesday after allowable has been assigned or well is Plugged, Abandoned, or Sold.
"Final Report" should be submitted also when operations are suspended for an indefinite or appreciable length of time. On workovers when an official test is not
required upon completion, report completion and representative test data in blocks provided_ The "Final Report" form may be used for reporting the entire
operation if space is available.
Accounting cost center code
District Alaska County or Parish
Field Lease or Unit
Kuparuk River
Auth. or W.O. no. T t e
AFE 203661
North Slope Borough
ADL 25642
Completion
Roll'N 4 API
Operator I A.R.Co. W.I.
ARCO Alaska, Inc. I 56.24%
Spudded or W.O. begun Date
Complete 2/24/85
Date and depth Complete record for each day reported
as of 8:00 a.m.
State
2/25/85
50-029-21255
I otal number of wells (active or inactive) on this
ost center prior to plugging and
bandonment of this well
our I Prior status if a W.O.
I
1300 hrs.
7" @ 7084'
6994' PBTD, 7122' TD, RR
10.2 ppg NaC1/NaBr
Accept rig @ 1300 hrs, 2/22/85. ND tree, NU &tst BOPE. RU
WL, RIH w/4" csg gun, 4 SPF @ 120° phasing. Perf 6822'-6812',
6802'-6790' & 6786'-6780'. RIH w/5" csg guns, 12 SPF, 120°
phasing. Perf 6654'-6600' & 6668'-6663'. RIH w/FB-1 pkr, set
@ 6698'. RIH w/207 its, 3½", 9.3#, J-55 8RD EUE IPC tbg. Set
top pkr, shear PBR, lnd tbg. Set BPV. ND BOPE, NU &tst tree.
Displ well to crude. Set BPV. RR @ 1530 hrs, 2/24/85.
FB-1Perf Pkr @ 6700.20', "D" Nipple @ 6714.54', TT @ 6720.80'
SSSV @ 1887.02'
Alaska
Old TD New TD
6994 ' PBTD
Released rig Date
1530 hrs.
lWell no.
2W-16
Classifications (oil, gas, etc.)
Oil
Producing method
Polential lest data
Flowing
PB Depth
7122'
Kind of rig
2/24/85
Type completion (single, dual, etc.)
Single
Official rese~oir name(s)
Kuparuk Sands
Rotary
Well no. Date Reservoir Producing Interval Oil or gas Test time Production ~ "-, .1
Oil on test Gas ~'e~d~a~A
Pump size, SPM X length Choke size T.P. C.P. Water % GOR Gravity Allowable Effec~
"~.~..
The above is correct
Signature [ Date ] Title
ff/J~ ~_~_ ___~_~_j 3 / 21/85 Drilling Superintendent
For form preparation and disl~ibution,
see Procedures Manual, Section 10,
Oritling, Pages 86 and 87.
ARCO Oil and Gas Company
Well History- Initial Report- Daily
Instmctlanl: Prepare and submit the "Initial Repe~t" on Ihe first Wednesday after a well is spudded or workover operations are started.
Dally work prior to spudding should be summarized on the form giving inclusive dates only.
District
Alaska
Field
Kuparuk River
Auth. or W.O. no.
AFE 203696
[~un~, pari~ or ~rough
Le~e or Unit North Slo'
I ADL 25642
ITItl, Drill, Complete & Perforate
;late
Alaska
IWell no.
2w-16
Parker 141
API 50-029-21255
Operator
ARCO Alaska, Inc.
Spudded or W.O. begun
Spudded
Date and depth
as of 8:00 a,m,
1/24/85
1/25/85
1/26/85
thru
1128185
1/29/85
IDle IHour ~ ~
1/24/85 G~45 hrs.
Complete record for each day reported
ARCO W.,. 56.24%
Prior status if a W.O.
16" @ 92'
503', (410'), Drlg
Wt. 9.5, PV 11, YP 13, PH 11, WL 16, Sol 7
Accept rig @ 1300 hrs, 1/23/85. NU diverter sys. Spud well @
O-2~hrs, 1/24/85. Drl 12¼" hole to 503'.
03oO
16" @ 93'
3172', (2669'), POH
Wt. 9.4+, PV 15, YP 20, PH 9.5, WL 19, Sol 8
Drl & surv 12¼" hole to 3172', short trip, C&C mud, POH f/OHL.
1928', Assumed vertical
2058', 6.4°, N35.2E, 2056.79 TVD, 7.53 VS, 6.16N, 4.35E
2589', 22.2°, N31E, 2566.18 TVD, 154.99 VS, 125.54N, 91.42~
2808', 24.5°, N30.6E, 2767 24 TVD, 241.76 VS, 200.13N, 135.87E"~
9-5/8" @ 3160'
7022', (3850'), RU Schl
Wt. 10.2, PV 14, YP 10, PH 8.5, WL 6.1, Sol 10
Fin LD DP. Rn 79 its, 9-5/8", 36#, J-55 butt csg w/FS @ 3160'.
Cmt csg w/700 sx AS III @ 12.2 ppg & 440 sx C1 "G" @ 15.8 ppg.
Displ & bump plug w/1500 psi; OK. NU & tst BOPE. TIH w/8½"
bit, tst csg to 1500 psi. DO cmt & flt equip. Conduct
leak-off tst to 12.4 EMW. Drl & surv 8½" hole to 6638'. Prep
to trip, hole taking fluid. Mx & spot LCM pill. Hole took 325
bbls mud. POH, wet hole static. TIH, drl 6638'-7022', short
trip, POH f/logs.
3409', 34.7°, N34.5E, 3273.10 TVD, 563.39 VS, 461.64N, 323.49E
4407', 35.2°, N36E, 4088.93 TVD, 1137.05 VS, 927.12N, 669.63E
5375', 35.1°, N36E, 4899.89 TVD, 1691.84 VS, 1373.12N, 1020.06E
5870', 36.5°, N36.5E, 5301.35 TVD, 1980.74 VS, 1606.62N, 1191.27E
6371', 35.5°, N34.SE, 5706.67 TVD, 2274.95 VS, 1845.90N, 1362.89E
6974', 29.5°, N37E, 6210.25 TVD, 2605.12 VS, 2114.13N, 1556.88E
9-5/8" @ 3160'
7022', (0'), TIH w/bit
Wt. 10.3+, PV 13, YP 9, PH 8.5, WL 6.6, Sol 10
RU Schl & RIH w/FDC/CNL/GR/DIL/SFL/SP/CAL; unable to go past
6645'. TIH w/bit & wipe out tight spot. POH; hole took 45
bbls of mud during trip. RU loggers & rn DIL/SP/SFL/Microlog/
GR/CAL f/7017'-3160'; LDT/CNL f/7017'-6400', 5600'-5400',
3600'-3160'; FDC/GR f/7017'-6400', 5600'-5400', 4000'-3950',
3500'-3160'. TIH w/bit.
The above la correct
Signature
For form preparation and dlstr u and
see Procedures Manual, Section 10, --
Drilling, Pages 88 and 87.
IDate I Title
Drilling Superintendent
ARCO Oil and Gas Company
Daily Well History-Final Report
Instructions: Prepare and submit the "Final Report" on the first Wednesday after allowable has been assigned or well is Plugged, Abandoned, or Sold.
"Fi'hal Report" should be submitted also when operations are suspended for an indefinite or appreciable length of time. On workovers when an official test is not
required upon completion, report completion and representative test data in blocks provided. The "Final Report" form may be used tor reporting the entire
operalion if space is available.
I Accounting
District ICounty or Parish I State
Alaska North Slope Borough
Field ILease or Unit
Kuparuk River I ADL 25642
Auth. or W,O. no, ~Title
AFE 203696 I Drill, Complete & Perforate
cost center code
Alaska
JWell no.
2W-16
Parker 141
API 50-029-21255
W.I. rl-otal number of wells (active or inactive) on this
Icost center prior to plugging and
56.24% Jabandonment of this welt
JHour O ..~O(~ J Prior status if a W.O.
1/24/85 ! q~ hrs.
I
Operator A.R.Co.
ARCO Alaska, Inc.
Spudded or w.O.spuddedbegun Date
Date and depth Complete record for each day repealed
as of 8:00 a.m.
1/30/85
1/31/85
2/02/85
9-5/8" @ 3160'
7122', (100'), Displ'g cmt w/ NaC1/NaBr
Wt. 10.1, PV 13, YP 8, PH 8.5, WL 6, Sol 9
Fin TIH, drl to 7122', C&C, POH. RU & rn 164 jts, 7", 26#,
J-55, butt csg w/FC @ 6994', FS @ 7084'. Cmt w/127 sx Cl "G"
w/1.5% D-79, 1.2% D-112, .5% D-65, .2% D-46, .25% D-13
w/1/4#/sx celloflake. Follow w/232 sx Cl "G" w/3% KCl, .8%
D-60 & .2% D-46. Displ using rig pmps w/10.1NaC1/NaBr.
7" @ 7084'
6994' PBTD, (0'), RR
10.1 ppg NaC1/NaBr
Fin displ'g cmt w/brine. Bump plug w/3000 psi f/15 min; OK.
Flts held OK. CIP @ 0630 hrs, 1/30/85. ND BOP & set slips.
NU tree &tst same. RR @ 1400 hrs, 1/30/85.
6994 ' PBTD
Rn CBL f/PBTD-4400'. Rn gyro f/6956'-49'. R~CEJVED
APR 5 1985
Oil & Gas Cons, Commission
Old TO I New TD PB Depth
6994
!
I
PBTD
Released rig J Cate JK nd of rig
1400 hrs. J 1/30/85 J Rotary
Classifications (oil, gas, etc.) I Type completion (single, dual, etc.)
Oil J Single
Producing method I Official reservoir name(s)
Flowing I Kuparuk Sands
Potential test data
Well no. Date Reservoir Producing Interval Oil or gas Test time Production
Oil on test Gas per day
Pump size, SPM X length Choke size T.P. C.P. Water % GOR Gravity Allowable Effective date
corrected
The above is correct
~;.d ~ 2/22/85
For form preparer;on and distril~tion, ,
see Procedures Manual, Section 10,
Drilling, Pages 86 and 87.
Drilling Superintendent
$ UB-S URFA CE
DIRECTIONAL
SURVEY
[-~] UIDANCE
[~] ONTINUOUS
r-~-] co L
RECEIVED
iViAR 2 6 1~5
Alaska 0it & Gas Cons, Commission
Anchorage
Company
ATLANTIC RICHFIELD COMPANY
Well Name
2W-16 715' FNL, 29' FWL, S34, T12N, R9E, UM
Field/Location KUPARUK, NORTH SLOPE, ALASKA
Job Reference No.
70129
Logged By:
G. JOHNSON
Date
25-FEB- 1985
Computed By:
ST EVEN S
~CT DlPECTTONAf, SURVFY
Ffl~
ARCO ALASKA, INC,
2W-16
KLIPAR!JK
~!L)RT~l SbO[)[','l, ALASKA
SURVEY DATE: 1-F~B-85
BN6INE~R: ~,. jOHNSON
~EThnDS oF CO~vtPUTAmION
TOOl,, Lr)CATTOh!: TANGFN~.I~b- averaqed devJation and azimuth
T NTL;T.~ POL AT I 0,~,': LINEAR
YFRTICA[. S~2C'I!!D'~: H~]RtZ, DiST, PROJECTED ONTO A TARGET AZIMUTM OF N~RTH ]~ D~G ~2 MIN EAST
ARCC~ ~L~SKA, TNt.
2W-16
KIIP~RIIK
N~IRTt4 S[,(JPE,
Cfl~',Pb'rATIQN DAT~: 25-1:'EB-R5
DATE OF SURVEY: 1-FEB-85
KELLY RUSHTNG F, bF. VATION:
JOHNSON
iN'IFRPOLATED VAT,UF..8 FOR EVEM 100 FEFT OF MEASURED DEPTH
'l' R U W, RUR-SEA COUPSF
~EASURF~D VFRTIC. AI, VEPTTCAL DP~VTATZOi'~
~EPTU I)~PTi! r~p;PTH UMG MTN DEG
o.0o o.on -93.00 (} o N 0 0 E
lOO.O0 100 O0 7,00 0 12 ~ ~ 24 ~
~00 o0 200:00 lov.o0 0 15 ~' 3'1 40 w
300:00 300 O0 ~07.00 0 7 W 1'1 24 ~
~00.n0 400~0o 307.00 0 11 ~ 75 40 ~
~00.o0 500.0n 407.00 0 17 ~ 58 21 F
600.n0
0o ~07.00 0 16 N ~4 40 F
600'90 &06 09 0 q ~ 14 27 W
700 00 699, ,
800~00 709.90 706,99 0 ~ ~1 54 30 F
~00'00 899,90 g06,09 0 11 "55 46 F
1000,O0 909.90 006.99
1100,00 1009 90 tO06,09
1~00.00 1109 90 1106,q9
1300,00 1209 90 1706,09
1400.00 11399 9~ 1306.08
1500.00 1409 9P i406.08
160n.00 1509 9~ 'IKOA,O8
1700.00 1609 9R 1606,0~
1~00,O0 1'709 9R 170~,08
1900.00 1809 97 1R06,97
4 16
8 24
56 2104 56 12 35
27 2~01197 !6 48
15 2996,15 19 5R
05 2~8~,05 ~2 5q
36 2481,36 22 R
30 2574,30 71 1~
73 ~666.73 94 1R
2~ 2756,23 ?8 2~
2000,00 1999.Sn .IOO6,R8
21 00,00 ?0q9 2~ 2006,25
2200,00 ~197
300 O0 7294
22400!00 'Y3~9
250h O0 9,4R2
2600.00 ?574
2700,O0 ,9.667
2800,00 2759
2000,00 2849
3000 nO ~935 42 2n4~,42 ]2 12
310o:00 3018 b~ 2025,68 34 54
3007,63
PAGE I
63 34 23
1.1 3090.11. 34 20
49 317'9,49 34 36
7~ 3954,78 34 38
93 3336.03 34 4°
90 341~ 99 34 52
93 3~00~03 35
6g 3582,68 35 15
3200,00 3100
3300,00 31~3
3400.00 3265
3500.00 3347
3600 n0 3~29
37001n0 ~51.1
3800.00 3503
3900,n0 3675
93,.00 FT
0.92
0.56
0.~.7
I .08
1.45
1.04
2,27
2.39
2.R7
9,96
2.29
1.45
0,63
0,14
-0,18
-0,53
-0.09
1,26
4,q0
15,84
34.05
59,30
90.68
127,75
!65.65
202,57
~40.69
285.~4
335,~5
390,87
~i7.~6
504.33
560.~7
617,52
674,42
73!,43
78R,63
846,t0
0,00
0.30
0,36
0.10
0,11
O,1R
0,17
0,17
0.26
0,29
0,33
0,56
0,16
0 39
0 31
0 33
0 17
0 80
0 76
0 46
4 40
4 65
3 90
3 56
0 91
0 45
4 44
3,52
4 O4
3 46
0 50
0 28
0 2~
0 31.
0 27
0 16
0 3!
0 2~
0,00
0 23 ~{
0 49
0 80 ~
0 92 N
1 10 N
1,47
1,8]
1,98
2,06
2,30
1,8.3
1'02
0:28
0,29
0,62
0,91
0,58
0,38
3 05 M
11 75 N
27 31. N
47 87 ~
72 43 Iv
0.00
0,05
0 27
0137
0,56
0,97
1,31
1,35
1,34
1,50
1,74
1,68
1,40
1,11
0,73
0,71
0,64
0.,45
0,74
1,74
4 34 ~
!1 04 R
20 5~ E
35 24 R
55 10 ~
0,00 N 0 0 E
0 23 N 11 20 E
0 56 N 29 1 E
0 88 N 24 37 E
1 061 N 31 1,4 E
I 47 N 41 27 E
1 97 N 41 44 E
2 27 N 36 28
2 39 N 34 3t
255 N 36 8 E
2.8R N 37 4 E
2 96 N 34 38 E
2 30 N 37 22 E
1 51 N 47 30 E
0 78 N 69. 24 E
0 77 $ 67 48 E
0 89 $ 45 47 E
1,01 S 26 9 E
0,95 S 51 52 E
1,7fl N 77 35 E
5 30 N 54 52 E
1.6 13 N 4312 E
34 16 N ~6 55 E
59 45 N 36 21 E
91 O1 N ~7 15 E
100
132
163
195
232
56 M 79
24 N 100
36 ~ 120
56 ~! 141
89 N 165
05 E 127 9! N 38 lO E
79 E 166 27 N 37 18 E
65 R 203 08 N 36 26 [
06 R 241,13 a 35 48
38 E 285'63 N 35 22 g
274 49 ~
317 66 ~
363
408 56 N
453 99 ~
499 64 ~
545 61 ~
501
637
684
194,20 E
228,94 R
34 N 263,53 g
297,4'7 E
331,40 R 562
365,20 E 618
398,95 g 675
69 ~ 432,75 E 733
94 ~ 466,62 E 79
0
5~ N 500,51 g 847
336 20 N 35 17 E
391 57 N 35 46 E
448 84 N 35 57 E
505 38 N 36 3 E
O~ N36 7 E
88 N 36 9 E
91 N 36 1,0 E,
05 N36 10 E
38 N 36 11 E
97 N 36 10 E
VERTTCAL DOGLEG RFCTAHGUI.,AR COORDINATES HORIZ, DEPARTURE
SFCTIflN SEVERITY NORTH/SOUTH EAST/WEST DIST, RZIMUTH
FFET DEG/IO0 FEET FEET FEET DEG MIN
ARC~ A]LAS~A, TNt.
~IJP~RI1K
NORTH ST OPE, ALASKA
DATE] OF SURVEY: 1-FEB-85
KELLY RUSHING E~EVATION:
ENG~N~ER: G, JOHNSON
INTERPO[oATED VALUES FOR EVEN 100 FE~T OF MEAS[~R~D D~PTH
TPUF $[JR-SEa CnURSF
4EA$!IRFD VERTICAL VE~'rTC~L I}EVIAWInN AZIMUTH
DEPTH D~PTH DEPTH DEG MIN DFG MTN
PAGE 2
4n00.00 3757.35 3664.35 35 2)
4100.00 ~838,83 3745,83 35 1~
4900.00 3990.46 3~27,46 35 ~
4300.n0 4002,30 390~,30 35 0
4400.00 40~4 1~ 3n9~,16 35 6
4500,00 4165~8~ 407P,08 35 16
4600 O0 0247,4& 4154,46 35 22
4700~O0 0328,8g ,i235,88 35 40
4800,O0 4410,13 4317.13 35 31
4900.00 4491,57 4)9A.57 ~5 24
5000.00 0573 la 4~80,!0 35 23
5100.n0 4654:5P 4561,58 35 2~
5200,o0 47~b
5300 00 0817
5400:00 ~899 3~ 4g06o~2 35 21
5500 00 4980:81 4~87 ~1 35 24
5600~00 5062 21
5700~00 5143'2~
5nOO
5900~00 5304,ba 5711.54 ~6 20
6000 O0 ~3~5 05 5992.05 3o 16
610o"o0 5465:71 5~7~.71 ~6 7
6~00:.~0 5546,43 5453,g3 36 1~
6300.00 50~7 29 5~34.~2 ~5 4~
6400 00 5708:47 5615,a. 2 ]5 42
6~00:O0 5799,6o 5696.69 35 34
660n O0 5871.2n 577P.~0 35 1~
6700:00 5953,0~ 5R00,02 34 40
6800.o0 6036,14 5n43.14 32 47
6900.00 ~1~0,97 6027.97 30 53
7000,00 6207 'lP 6114.~8 29 21
7100,00 62~4:93 6701,93 ?9 21.
7122.00 6314.10 6721.10 99
93,00 FT
N 37 q E 1480,82
~ ~7 11 w 1538.58
~ 37 8 E 1596,?1
~ 37 4 E 1653.73
~ 37 11 g 1711.48
~ 37 19 ~ 1769,23
'.' 37 14 F 1~27.09
~ 37 1~ E 1885.50
N 37 1~ E 1.944,24
~ 37 20 ~ 2003,29
~ 37 14 E 2062,38
~ 36 53 E 2121,29
~ 36 2~ E 2180,!7
~ 35 53 E 2~3~.97
~ ~5 4~ E 2~97.~2
~ 35 50 w 2355,40
~ ~6 3 F 24.1~.22
~ 36 2 ~ 2470.59
~ 3~ 15 W 2526,05
~3 36 17 E 257~,88
~ ~6 49 E 262~,38
~ ~6 40 E 2677.76
~ 36 40 E 2688,02
0,90
0,9!
0,2g
0,1~
0,27
0.21.
0.05
0 65
0:23
0,61
0,1n
o,23
0,23
0,81
0,27
0,1~
0,27
0,40
0,42
0,31
0,17
0,38
C),46
0,74
0,~
0, 7
0,93
1,34
1,33
2,90
0,00
0,00
0.00'
731.22 ~ 534.40 E 905.68 N 36 9 E
778,13 a~ 568,45 E 963,65 N 36 8 E
824,91 N 602,35 E 1021,42 N 36 8 E
871,45 N 636,07 E 1078,89 N 36 7 E
9J7,94 E 669,78 F 1136,32 N 36 6 E
964,58 ~! 703.65 E 1193.95 N 36 6 E
~011,39 N 737,60 ~ ~25~,79 N 36 6 E
1058,31 ~ 771,80 E 1309,85 N 36 6 ~
~105,35 N 806,22 E 1368,.14 N 36 6 (
115~,97 ~ 840,78 E 14~6,~6 N 36 7 E
1198 20 N 875 65 E 1484 07 N 36 9 E
1244 38 N 910 70 E 1542 03 N 36 11 E
1,200
1336
I .
1475
1521
]568
]615
46 N 945 65 g 15q9
48 ~ 900 49 ~ 1657
66 ~ 1.015 48 ~ 1715
81 ~ 1050 56 F 1773
03 N i085 73 E 1831
68 ~ 1121 22 E 1.890
56 ~ 1~,56,98 ~ ~949
69 N 1192,9~ E 2008
86 N 36 14 E
57 U 36 1.5 E
51 N 36 17 E
46 N 36 19 E
53 N 36 21E
14 N 36 23 E
10 ~ 36 24 g
36 N 36 26 E
1.662 90 ~
1710
1,757
1805
1852
1899
94
2037
2080
05 ~ 126~
45 N 129
06 N 1334
36 ~ 1368
63 ~ 1402
55 N 1436
03 ~ ~470
91 ~ 1503
05 N 1534
1228 83 E 2067 67 N 36 27 E
67 E 2185 81 N 9 E
39 E 2244 73 N 36 28 E
57 E 2303 09 N 36 ~7 E
65 E ~361,37 N 36 26 E
63 E 241~ 29 N 36 25 E
25 E 9532,36 N 36 24
52 E 2585.32 N 36 24 £
2120,47 N 1564,15 E 2634,9~ N 36 24 E
2159,72 ~ 1593.54 E 9683,'98 N 36 25 E
2168,35 , 1600,01 g 2694,7~ N 36 25 E
~' 35 56 F
~ 35 5R F 961,55
~ 35 54 E 1010,21
~ 35 5& F 1076,57
~' 35 57 E 1133.88
~t 35 5~ w 1191,41
~ 36 1 ~ 1240.13
~ 3b 5 E 1107.06
~ 36 2~ ~ 1365.~2
~ ]6 49 ~ 14]].10
VERTTCAI, DUCLEG RECTANGULAR COORDINATES HORIZ. DEPARTURE
SECTION SEVERITY NSR~H/$OUTI-! EAST/WEST DIST, AZIMUTH
FFET DEG/100 FEET FEET FEET DEG
2W-1 b
COIqPt]TAWlr!N DATE:
DATE OF SURVKYI 1-FEB-g5
KELDY BUSHTNG EbEV~TTON:
E~GTNEEP: G, JOHNSON
INTERPDI:ATED V,h,I',IIFS FnR EYEN 1000 FEET OF MEASURED DEPT
PAGE: 3
'I'PU~ SU~-SE~ C~UPS~
DEPT~ D~PT,t nEPTH DEG MTN DEG MTN
O.OO 0,0o -9~.00 0
lnOO.Oo 909,9~ g06.99 0
200o,ou 1909,8g lO06,88 4 1~
3ou~.oo ~935,42 2949.42 ]2 1~
4000 oo 37K'1,3~ 3664.35 35 27
5000"00 4573,10 44.80,~0 35 23
6oon~o q3~5.05 5~99,05 36 16
7000 o() 6207,7P 6~14,78 ~9 2~
7122:00 6114.1o 6221,10 ~9 2~,
93,.00 FT
~: 0 0 F n.O0
r,! 43 50 F 4.90
~ 30 36 w 335.85
~? 35 5~ F 903,70
~ ~7 q ~ 1480.82
N 37 ~4 ~ 206~.38
N 36 4g F 2628.]8
~ ~ 4g F 268P.02
0.0~
0,33
4.~?
4 O4
0~90
0.10
0,17
0,00
0,00
0,00
2,30 ~ 1,74 £ 2
3 05 ~ 4,34 E 5
274 49 ~ 104,20 E 3]6
731 2~ ~ 534,40 E 905
1198 20 N 875,65 K 1484
1662 90 N 12~8,8] E ~067
9190 47 ~ ~564 15 F
2~68 35 ~ 1600:0! E 9694
0,00 E 0 O0 N 0 0 E
88 N 37 4 E
30 N 54 52 E
29 N 35 17 E
68 N 36 9 E
07 N 36 9 E
67 N 36 27 E
95 N 36 24
VE~TTCAL DOGLEG RFCTANGI.IL~ COORDINATES MORIZ, DEPARTURE
SKCTION SEvE~!?Y NORTH/SOUTH EaST/WEST DIST, AZIMUTH
FRET DEC/lO0 FEFT FEET FEET DEG MIN
ARCO ALjASKA, T,NC.
2W-16
COhPUTA'rln~ D~TF: 25-FER-~5
DATE OF SURVEY: 1-FER-85
KELLY BUSHTNG ELEVATIUN:
ENGINEER: G, JOHNSON
INTERPOI,ATED VAT, UK5 FOR hiV~N 1.00 FEET OF SUB-SEA DEPTH
PAGE 4
93,00 FT
TgI~E $0R-$E~ CnURSr
~EASI~RFD VFRTIeA{, VERTICAL D~VIATION A~IHUTh
DEPTH DWPTH DEPTH DEG MTN D~G ~IN
O.00 0.00 -9].00 0 0 N 0 0 F
93.00 93.0~ 0.00 0 13 N '1 1~ Ft
~93.O0 103.0n i00.00 0 15 ~ 42 53 ~
~93.00 203.00 ?00.00 0 ~ ~' ~6 4 ~
393.n0 393.00 ]0n.o0 0 11 ~' 76 4 ?
493.00 493.00 4.0~.00 0 {7 ~! 60 6 F
~93.00 503.00 500,00 0 16 ~' ~7 15 ~
693,01 603.00 600,00 0 9 ~ 13 1] W
793.01 7~3 00 700,00 0 ? ~! 46 50 F
893.O1 803:00 ~00.00 0 10 ~ 6U ~ F
993.O1 903.O0 O00.00
1093.Oi 1003.00 1000.00
1193.nl !103 00 1100.00
1~93.O1 ~293 00 1700.O0
1393.02
1493,n2 1,493 On 140n.o0
1593 02 15o3 0n 150n.o0
169]:02 1693 00 1600.00
179}.02 !703 0n 170o nO
1~93.03 1803,00 1800:00
1993.10 19q3.00 1000.00 3 5~
2093,68 ~Oq3,00 2000.00 8 R
2195.~4 7193,0~ 2100,00 12 ~
2~9~,67 ~203,00 ~?00,00 16 4.5
2404.10 9303 0O 2]0o.00 ?0 6
2511,q0 ~403 On 240o,00 ~2 50
2620 11 75013 On 2~00.00 ?1 5R
2727:09 ~bo3 0O 260n.00 71 36
2836 74 7793 (>0 270n,00 95 5~
2950~6 9~83.00 2R00,nO ~0 ~0
306~.R3 7903,0n 2o()o,00 34
3190 75 3093.0n 300o,00 34 24
3311:99 3103 00 3100.o0 ]4 30
343].4,4 3203~00 3700,~0 34 37
3~55 02 3303,t)n 3300,o0 34 47
36761P5 3493.00 340n,00 34 52
379~ ~6 3593,0o 3~0o,00 ~5
3021.1~1 3693.0~ 3600 n0 35 15
404].78 ~793.00 3700~00 35 27
4166.41 3893.00 .3R00.00 35 13
VERTICAL D[~GhF. G }~ECTANGUbAR COORDINATES HORIZ. DEPARTURE
SF. CTIf~D SEVERITY NORTH/SOUTH EAST/WEST DIST. AZIMUTH
FEET DEG/100 FEET FEET FEET DEG MIN
O,00 0,00 N 0,00
0.19 0,20 ~ 0,04
n,53 0,47 N 0,25
0.~6 0,79 ~ 0,36
1.06 0,9~ ~ 0.54
1.42 1,0~ N 0,94
1.gl 1.44 N 1,2q
2.~5 1.81 ~ 1,36
~,]8 I 98 v 1.33
9.53 2~05 N 1.40
2,35
1.51
0.67
-0,51
-O.16
1.15
4.41
14,q3
33,05
5~.92
92,05
131.,90
~56,29
300.94
3'13.32
4'42,7b
511.10
579.81
64R,~1
71R,23
787.97
~58.32
920.06
999.89
0.00
0.2?
0.34
0.13
0.00
0.14
0.20
0.13
0.21
0.20
0 23
0 56
0 10
0 19
0 39
0 46
0 75
0 60
4,57
4 4B
4 5~
4 02
.~ 50
0 92
2 61
~,58
4.54
0 64
0 24
0 19
0 2?
0 27
0 ]0
0 38
0 43
0 23
2 29 N 1.73
2~44 N 1,70
1.89 N 1.41
1.07 N 1.14
0.33 ~ 0.74
0,26 $ 0,71
0,60 $ 0.66
0,89 S 0,45
0,64, S 0,70
0,31 N 1,66
2 69 ~
10 gO N
26 47 ~
4.7 57 N
73 48 N
3 90 ~
10 55 E
1.9 98 E
35 O1 K
0 O0 N 0 0 E
0 21 N 11 51 E
0 53 N 28 16 E
0 87 IV 24 46 E
1 06 N 30 22 E
143 N 41 0 E
1,9] 19 42 1 £
2.26 N 36 51 "'
2,3R N 34 2(
2,53 N 35 56 ~
2 97 N 37 1 E
2 98 N 34 48 E
2 36 N 36 50 E
1 56 n 46 50 E
0 81 N 66 22 E
0 76 S 69 41 E
0 89 5 47 40 E
I 00 $ 26 53 E
95 S 47 42 E
~ 69 ri 79 25 E
4 81 N 55 59 E
~5 24 N 43 5O E
33 16 N 37 2 E
59 07 N 36 20 E
56 O1 ~ 92 40 N 37 19 E
104 29 M ~1
138 59 ~ 104
171 79 N 196
208 70 ~ 149
253.36 ~ 179
86 E 132
88 F 173
06 E 213
46 ~ 256
23 r 310
57 ~ 38 7 E
81 N 37 6 E
70 ,~ 35
34 N 35 16 E
303 94 ~ 217,81 E 373,93 N 35 37 E
359 16 N 260.40 E 443,63 N 35 56 E
413 99 ~ 301,55 E 512 17 N 36 4 E
469 24 N 342,73 E 581 08 N 36 8 E
5~4 91 ~ 383 77 E 650 24 N 36 10 E
58! 02 g 494 92 r 7~9 82 N 36 10 E
037 41 ~ 466 24 F 789 73 N 36 11E
604 41N 507 71 E 860 22 N 36 i0 E
751 78 N 549 33 E 931 09 N 36 9 E
809,2~ N 59~ 00 E ~002 06 ~ ~6 ~ E
2w-16
KIIP~RI~K
NORTH SLOPE,
CO.~,qPUTA'rln~ OAY~: 25-FER-g5 [:)AGE
DATE OF SURVEY% 1-FER-85
KEI.,bY BUSH~N~ EbEVA~ION{
ENGTNEER= G. JOHNSO~
INT~RPOT.,ATE~ v~T,L)FS FO~ EV~]~ 100 FE~T OF SUB-SEA DEPTH
93,.00 FT
TRUF, sur~-$EA COUP, SE
4EA$IIRF[> VFR'~'ICAT, VE~TTCAL DEVIATION AF, iNI,1TH
DEPT~-~ DF, pT!t DEPTH DEG MTN b.W,.G mTN
VE~TTCAL DOGLEG RECTANGULAR cnOPDYNATE$ MORIZ, DEPARTURE
SECTION SEVEPITY NORTH/SOUTH EAST/WE$'f DIST, AZIMUTH
FEET DEG/IO0 FEET FEET FEET DEG ~IN
498~.65 )903.0n 3900.00 34 5q
4410.~1 4003.00 4n00.O0 ~5 8
4533 23 4103.00 410n,00 35 lq
4655:n9 4203,0o .t20n.00 35 3n
477n.~4 43~3 On 4t0n,00 35 35
4~01.75 4403.00 4400.00 35 24
5024 4i 4593.00 ,tSOn. O0 35 2~
5147'14 4603.00 4600 O0 ~5 2~
5~69'62 47o300 4700~00 35 1~
5~9~:25 4~93:0n ~001nO ~5 26
M 35 56 E 107n.07
~ ~5 5R F 1140,09
~ 35 5~ ~ 1210.M7
~' ~b 5 F 1781.~6
~ 36 1~ F 1353 O1
~' 36 49 E 1424:11
N 37 11 F 1494.01
N 37 10 ~ 1565.~0
~{ 37 6 ~ 1636,~?
N 37 ~! ~ 1707,01
0.0,
0.18
0,14
0.17
0.43
0.60
0 19
0:70
0,24
0.17
866 IR N 632,25 ~ 1072
9~2 97 N 673,43 E 1142
980 13 N 714 91 g 1213
1037
1095
1152
1209
1266
1322
1379
59 N 756
49 N 798
7~ N 841
47 N 8~4
14 N 927
50 N 969
10 N 1012
67 E 1284
97 F 1355
39 ~ 1427
20 E 1498
2! E 1569
93 ~ 1640
77 E 1711
38 N 36 7 E
53 N 36 6 g
15 N 36 6 g
19 N 36 6 E
89 N 36 6 E
18 N 36 7 E
21 N 36 10 E
34 N 36 12 ~
05 N 36 15
03 N 36 17 E
5514 o6 4903,00 4000.00 35 23
5637:04 5093 O0 5n0n.00 35
5761,61 51o3:00 51oo.o0 36 7
5885.65 5293'00 5~OO,nO 36 27
6~0~.R6 5393.00
6133 RO ~493,00 54.00.00
i O0 5~00 O0 36
6257 71 5503, ,
6381 Ol ~bq3.0n b6On. O0 35 41
6504.07 5703.0n 5700.00 35 33
6626.72 5893,00 5~00,00 35
H 37 In E 1777.~7
~ 37 15 F 1849.18
~ ~7 20 F 1921.6~
~I 37 21 ~ 1994,7B
~ 37 12 F 20bR,20
~I 36 42 F
~ 36 .4 F 2241
2!
~ 35 51 ~ 2286,16
P.l35 50 F 2357.76
~I 36 9 F 2~28.63
0,34
0,53
0,10
0,51
0,30
0.44
0.56
0,1~
0,31
0,81
1435 70 N 1055 82 E 1782 13 N 36 19 E
1492 67 N 1099 15 F 1853 70 N 36 21 E
1550
1608
1667
1720
1784
1843
1901
1,959
55 N 1143
90 N 1187
54 N 1232
03 ~ 1276
95 N 1319
38 N 1362
55 N 14n4
o~ N 1445
25 ~ 1926
74 E 1909
36 F 2073
42 E ~146
80 F ~219
09 E ?202
04 ~ 2363
76 F 2434
46 N 36 24 E
83 N 36 26 E
50 N 36 27 E
72 N 36 29 E
89 N 36 28 E
01 N 36 27 E
73 N 36 26 E
75 N 36 25 E
6748..40 5903.0n 5o0n.o0 33 40
6867.25 6003. ()0 t~n0o, o0 ~t 4~
6983,05 6143,00 0100,00 ~9 21
7097.79 6293.0~ 6900,00 99 2~
7129.n0 Rj1.4,1n b921 .10 79 21
~ 36 6 F 2497
"' 36 40 r 2620,09
~ 36 49 E 2676,1~
~ 36 49 g' 268~,02
1,93
1.90
0.00
0,00
0.00
2015,07 N 1486,53 F 9504 05 N 36 24 E
2066,89 N 15~4,44 ~ 2568 26 N 36 24 E
~1!,3,8! N ~559,17 ~ ~6~6 64 N 36 24 E
~158,85 N 1592,89 ~ 9682 89 N 36 25 E
9168,35 N 1600,0! E 9694 77 N 36 95 E
ARCO /~LA,SKA, TNC.
KI!PJ~RUK
NORTh ,SLOPE, ~,LASKA
BASF
PBTP
TOT~b DEPTH
INTEI.,:ntJLATED VI\LuI:~S FnR CNL'IS£1",I HORIZON5
MF, ASiJPED DEPTH
RET,OW
67~]!on
6903 OO
69g4,0n
7122,00
PAGE '- 6
DATE OF St,IRVE¥: 1-FEB-85
K£I.,LY RU~HING EbEVATZON:
93,00 FT
ENGINEER: G, JONN$ON
ORTGIN= 715' FNL, 29'
T V D
F P (':) ~i KI'i SUB-SEA
5871.20 5778.20
5q16,~2 5823,~2
b005.~5 5912.15
6123.54 6030.54
6~0~.55 6109.55
b314.~0 6221.10
SURFACE LOCATION
AT
FWL, SEC 34. T12N RgE, UM
R£CTANGUL~R COORDI~ATFS
NORTH/SOUTH EAST/WEST
1946.55 N 1436.63
1972,t9 N 1455,35
2021,61 N 1491.30
2081.90 N 1535.44
2118.11 N 1562,39
21.68,35 N 1600,01
ARCh /~[,B.SKA, TI, lC.
2w-16
NOi~TH ST.[)PE, ~bASKA
~APK~R
COMPIITATION DATF: 25-FER-R5
**** ~***:t,*** ~31'RA TT.(;P APtt I C
I~ F,A S U P [,:., P PEP']'N
6600.00
6~5b.00
6763.00
6903.0~
6994,00
71~2,00
DATE OF SURVEY: 1-FEB-85
KELLY BUSHTNG FLEYATION:
ENGINEER: G, JOHNSON
93,00 FT
SURFACE [,DCATZON
AT
ORIGIN= 715' FNL, 29' FW;,, SEC 34, T12N, RgE, UN
TVD RECTANGUbAR COORDINATES
FRO" KH SUB-SEA NORTH/SOUTH E~ST/WEST
5778 20
5823 1~
5912 ~5
6030 54
6109 55
6221 10
1946.55 N
1972.19 N
2021.61N
2081.90 N
2118.11 N
2168.35 N
1436.63
1455.35
Z49~.30
1535.44
1562 39
soo:o
5871,20
5936.12
6005,1.5
6123.54
6202,55
6314.10
FINAl. WEI,b bnC/~TlOlg AT TD:
DEDT~-~ DVPTtt DEPTH
7XP2.00 b3%4,10 6271.10
HOHTZfDNTAYo DEPARTURE
DISTANCE AZ]
FIgF.,f DEG MTN
2694.77 N 36 25 F
SCHLUMBEROER
ARCO ALASKA, INC.
KUPARUK
NORTH SLOPE, ALASKA
FEBRUARY 1 , ]98S
TVN PLOT FROH OCT DATA
JOB REFERENCE 70] 29
SN
WELL: 2W- 16
SURFACE LOCATION:
715' FNL, 29' FWL, S34, T12N, R9E, UM
VERTICAL PROJECTION
-1000 -~00 0 0 SO0 1000 1SO0 ~000 ~SO0
-4-M-4.-.bb4.44.--44-.~-.:-~.--~4..4-~4--4.."...'-b4-¥-..44.--b.~+q4.~bb .-4---4---bb$.4---bbb- -4...b.H--.!...bb.b~......+..4...H.-.~.bLb~ ..... b~---4.--bbb~.-:4...b
~:::~::i::~:: Z:i::i::i:~:~:~ ~~:~:~: ::::::::::::::::::::::: ::::::::::::::::::::::::: ::::::::::::::::::::::::::::::::: ::::::::::::::ZE:::::::::::::::
.gZ-~-~L.-.~-.14~.L..--~i--~Zb.~-iZ--i...L.i~4.-{.4-4..-4-4---~-i-2--~4---b-~---..4.-4...~-4-T.-~...~...~-;..~-.~..-~..-~..4..-~.-~...~...~..-{ ...... b.{-.-l.--H{---]-{--.{--~.-.
.... L-L.Li..-b.L.L.i.i... ~ Li.-L.L 14.4-4.--.--.~-L.L.i-.L-.-4---L.i-4-4.4---:--.:-4 ...... ~.4.4.4-4.4.4...~.4 ...... ;.4.4.4 ....... ;.4.4.4 ...... i-4--.;.4 ...... ~.4...;...i....4...;...,...i...:...~...;...~...; ....
.... bH-H-~-~H-.---~..H.--b~-H---b ~-FH-EbFH-.-F-FH-b~H-- .-H---F-FFH--H.-.-.H---b~H--H-..~ ...... bb~---F 4-.H.-b FH-H.-.bH-.H
~-~"~-~- --~' '--~--~-~'-'~ ' ~'~'~'"E~ .... ~-~'H-i-~'"~'~" '-'~'~'i ~ ~'"~"H" -~.--~..~4.. ~-~-~-~--' '--H-~"H4- ~-H'~-'+-H' ~--+-'%H-H'
-'~T~ ~ ~ ~ ~ ~ ~ ~~TTF-~~~'~TT~T" q'T'FF~'T~TT-"TTVT"]Tr-FT' 'TTT'F?-YT'T-F
W1'Wi'-r'('~'t-('-~"t'-~'"i'-~"f-~i-'"'t"f-1"y ~'~'f~-" ;.-e-~-t--T-i.-~ ~..- f-f-t---t--~.-t.-i-~-t,-.--~-~--~-~ ;,.?~.-.f..-.t.-t-~-~-.~.-~-.~-%t ...... t'"t~'"~'" .-t.-?-.~.--~ ....
-H-H-H-H-H-HH-H+---. ---H-H-{.~.--t-~i--~--.~ ....... rmm~--H.H-H-~--~~~ --.---?'-?"*-'-T-~---~---,---* ....... H-~--~?--~-.-?-?-?-, ...... ~..-,---,.-.~ ....... ,-..?-?-~ ....... *'.-,.--*-.-* ...... ,--~--'*-"~ ....
-T'~-T"?'t"f'?t-f- "?t-t'%' '?~'?":'- -?--?-?..?- 1 -:-~-:-~:.-~---?--?--?--~--?-y-~-.---??--.?--.: l'"?'YIT'-?-' --f"f"?'?' -'f%t-lt''' "?t"'t'"t ..... t-'H"'~"--H'"H'"
-4-~-H~...~.~-~.. ~41.4_~.~..~_~._.~.l~..~4~_ ...~..~-~..~4_~l..~.. _~_~..~_4...~.....4~...~-L..~.4.-~-. -4..I~...~..~...L..~.-~...~--~...--4..-~-4-4....4-~.4.-~ ....
~'y~--'~--?--' ''~l'l?'''~''~''y''?''~''?--'" --~'~::~'"~'--~:?"?'"~::'~--' --'?'"~'"?'"y" l~' --?I' ~ ''~'~I '-'?"?'~-'?'~"T'I?'T"t ..... T'~'~--t'" -~"'+'+"~ .......... *"+"t'"t ..... ~"+'+"t-- %'+'+"* ....
-+.4-H-~-H-H-.-+.4.-+-4-++++H.-4--¢.-H---H-~++- .-4-+H..-~-H--~+--.--4-H--F+4.-4--H---.--4-+4-¢-k-+.H-4---~-H-'--H-H..-bbH...+ ....
---t--tff--t--~-?--t--~---~ ....... ¢---t-t--tl--?--t--t--~ ...... ~BD~"?'?"?~ ...... ?'?'???"?r--t ....... t..?..t..t...~.~...t..t.T......t..~...t..t.T..t...~..t.t...~~~...?t..t...;Tw..*...~...~ ....
..... ~ ~ ~ ~ ~ ~ . ~ ~ ~ ~ : ~ ~ ~ ~ ~ ~ ~ ~ ~ L..L4.LL.;..Z....&.. t ~ t
---?-,---?-?--b.,-.-?--?--~---?-??-?-~---,---?-, ....... ??"?"'"?"?-??" '"*?'~"?'""?'?'?'?' ?"?"?"'-'?"?'~'"'"' '"~'"?"71'''?''~'''~'''' ....... ?"'"" ...... '"'?'""' ...... ?"'"'"'?F'""'""'"' ....
_.~++~+_,_.~.~_.,~..+~++l~....,.+.++~?+..~??_~..?.~_ ..-~t--,---~.+-,--+-+-.~ ...... +-~-,--{--+-+++---+--+-+-+. -.+..?+.. ?..?,4--.: .......
_~__~. l~_ l...~_.~ --~.~.~.~...~.~,~ ,.,~,~.~.~-~--- ,.~-~--.~..~..4.--~... --~--.~..Z--~...~.Z.--{,,.~,.] ..ILZ.. : [ ...... ~ [_, [,Z ...... ;...~...~._~._~_,~..l~...~ ......
--~-~-~-I--~.~.4--~--.~ .--~-.H---bkHH--+-]-.{.-.{-{.-~...].-bb-{-.~-..-~.-bb~---bbbbb .4---~--$--b.bb{..~.-{4.4...L~Lb~..Z{-~.. ,--].-.{.-l~...~--b-~--'~---~'--~'" ---~'--~-"~-'~'-'i-"~'"~---~'--~
--f?t"fll?l"t'~'~"t'?t-ff'f'~ffff ...... ~-~t~-t- '-ff'ff'H-t"H-H--H'I?H-H-H''' -'fflH-?t"H"?""t"t"t"t" ---t--?t.--:.....
'TT-T'T-]~-'~-~'~"~'TTTT' ~"~'T' "':-'?'TT~T'y'~-T"["~'"y"r'?'T"~"-~-rl'rl' lllrT-?lll~-t--y-.y.-y--: ...... ?"'?'"?I"?"I'"~'"YlY'~ ...... ?'"r"Y":'" '"~l"?'"r"? ...... ?l"r"*"'~ ....... W'T'~'"rl'
--?-~-TI'Ft?-t't']T?TT- ~TFF 'ff'-~' :'-Ft'~'?-~'Ct-~"'Y"?'-?-?"t' -~'-t'?'-?"1"'t-tff't'" -%t"t"t-t-'t"~'t't ....... t"t"t-t .... t'"?-t't' '-t't"f"t .....
'TTT'TTTTTT']-'~"TT' M"?'~T~ ~"Fr-rT~FFF'T"FTTTVVl"rT'I-FTT'T'T-'TTTT' 'T'FT'TTiTTT 'T'Y"TTi'"T'"T'T'T ..... T'T'TT'"'TT-TT'
"-C?'%ff'ff'~"'t"t'"t ...... t--H~-%~---HH .... Ht..~-~'~-~--~.-,g--~ ....... ~'-H-{'"]"lb~'"~-'~'l"-4-~4'''L~'''~'~'4'4 ..... ~.14I..~.ll~...~.I.~..I*...LL.4...L.~..4...:..~'''~''':'--: .... :t .... ~ ':
~ ' ' :Z: Z~' '*ZY~: Z?lll~--t :?i:~ff-'l ''l'i~'''ff~'l~'ff--~--H'''''l'H'''H?l'H'l'~'''''+lH--F'~''~'H'''~ ...... b;''';''~''']''4'''b;'L' ::::::::::::::::::::::::::::::::
...}..4-&..~..~...¢...L..~...L.. '.. &..L..L_.L..' .L.2--g .... L..L..Z...L-~ ..~..L..~2 ...... L..~..}...L..{.2~X._.¢._2_...2..x...i ..L..~..~...L .2...2 . L ~ :. L 1. ~ ~2..L. 2 ..... L..L..4...~ ..... L..}...}..& ....... }...}...g...g ...... ¢...}...~.-.}-..
...~ t_.L~.L.LZLLLLLL~2LZ;_. 4..L.L.L.~4.4_i...L....L.L.L.L~.4...LL~. ~ ~ ~ ~ '..~. '...~..~ ~,:~ :.~ '....L(..~ ....... ;...LL.L.'...?....t4 ....... ;...L;...~...t.4....~...;.4...
4.4..4.4-.i-;...L.L.; ....... L.~.4..4-HL-L.L.; ..... ;.4...L.;-LZ.L.;-~-.4.4.4.4...}.4.4..4.4...~...~_.L.L.L.L.L.L4.4 ........ '-..L.;...L.L.L.L.;...~ ....... L.~...,..x...I.4...L.;...~ ....... L.;...~..4...L.L.L.L.;...
LL~.4..~-j..Z.L.L~ ...... LLLZ.]_.ZZ.i..L....L.L.L~.~_.i..LL~.._ .~..~_L~_Z_]_L~..Z~...L!..L.L.]_4..Z..Li.. _.Li..L.L]...L.L.L.~ ....... L.L.L.~...LL.].~.~: ~.~..L]...L.i..i..L.
L~4..~..LI{14...L.L~ ....... ~..L.L~...L.L.L.L....L.L-L.~--HL.L.{4 ...... L4.4-L.]-4.4--.L.LI]-~-L.L.L+..L.L.L.L.].4...~.llLIL.blL.L.L.~ ....... L.LI.L.L.]...L.L.L.L.~...4...LIL.L.b.~..L.~...~
,-~..H~.~-..b~-..~.~...~ ....... {I-H~---~.-+--H---{---~--:H--I~4I--I~--'~'~''~'--~I~'''l-~-'-{'''H'q''~-'~-~-~ ..... ~'4'''H'''H'''H'I'H'--'H'''H'''b~I''~'''H~ ....... H'''LH'''H'''H'''~'''H'''H'''bb~'''b'~
.... t'''t'l'H''li'llffltl''H ....... ff'H'l't'--il''tl''t'''H''':''~r~H'''H ...... t--''H'ff''l~14'''H'--'~ ...... H'I'Hj'.lff. H.IH...t...?..ff.?.H.llfl~ ....... ?l?''?l'b~'''H''l~ ...... t''fflff'H'--'H'''ffl~
"-~-'7-~-Y-T"T"Y'Y-~ ....... T"?"~-?-~-~"Y'?-Y"-~-~"Y'T F"Y'?-'Y'~-~-'T"~- ~_?.yl~_ _?_?.~...?..?_.?...?_?.~ ...... ?._?...?_.?.?..~...?..,?...?...~ ...?...?ll.?.? ..... 7...?--,?...? ..... ?...?,.,?...?.l.~...?,.T..y.?--,
.... ,..++,l,l,..~..,_l~ ....... ~.--.~..l~.l*~+l~.'*'l~ ..... ~.*.*+~-~.~+~m~"~..*..~-].~.~...~...~..~*..~...~...~...~...~.~.~...*...~-~...~..~...~.~.~.~.~..~.~.~...~..*..M*~..~...~ ..... ~''l*'l'~''*''l'''~'''~'''~'''~ ....
,..~-4-~.-.L.~-~..4-4 ...... ~...~..~.4.-L~.~.~.~-l..41.4...~~ :. [ [ I.~_~. ~-~"4~~.LL..~..~..4...]..4.-~..~".L.~i...~...~-~...~...~.~}~L~4..4...f..~-~...~..4 ...... ~..4.-~.-.~.,.{-~-..~---~...~ ....
~_llt..H_H.HH ....... Ft-?HH-llH--::H-H--~bH -H--~H%t-1 -H'"~'"t'HHH-tl'l?t"-tll'H"tlF?'ll~l"t"?'t'1'"t'H"~ ...... Ft'"t"t'"ff?'t't't
'' I ~ J J ~ lll]l ~ I J J [~ ~ J I ] J I I ~ J I J ~ J I '-'lyl~"~'~--]"~T'Z~~- '-]"T'~'i ~"~'-] . [Z]]~ .i i '~-T- ''T'']''']''']''1''l~'--]--']l'']l' --'] J J I ~' J J ~ ' I I ] ..... ~ J lJ~ J J J ~ J'' ~ J J J ] J J J ~ ] J ~ ] l l ] ~ ~ ] ] ] J ] ~ ~ ] ] ~ ] ] ] ] ~ ] ~ ] ~ ~ ~ ~ ~ ] ~ ~ ~ ~ ~ ~ ] ~ J ~ ~ ~ ~
??'?"t'-t-t'?i ....... t"t"-t'?T'?'~"t'"'"?r~'-?'t-""?"?i r'?%ff~' '"?'?'t-'?'"??'*"'t'?"?-?-'t'"??T't"~'--?'"?t"?T?t"t'"? ...... ?'?T"t"t"?'? ....
'-t'i'?Y't'T't"~T-i-'i"?'?'1'"F~"t"~ ....... Y"Y't?~"tT'T-?'""i-~-t~-~'"r"'"'~-i'"~'"~"I'"?'"?"'~-'~ '"f't'F?"l'"t'T":T~'"Fr"FF]'"t"i'"?'"t ..... Y'?"F]'"FFr"; ....
.... ?--?-~'"~---t --?---??-? ........ t--'?-?--?-'- "-?'??"T ....... ?--?'"?"?"~'~"?'~'-" "?'~-?'"?' ~ -?'-~"?-' "'?'?'?'"?-'?'?"'?'--?'"~ ...... ?-"~"'T'--T---t '-'?"?-"?"'?'~'"?'"* '"?'"? "' ."'?'"?"-~'"? .... ?'"?"'?'"~'" i "?"'?' t '--? ....
.... ~---~-.4-.~---L..~..-i...~...~ ...... ~--4 -.$-.-~.-]--.~-..~...~-..~ ...... ~--.$--.$-.4---*--4--.~.--L-.$ ....... ~--4---~--.~---H-~--4---~---~--- ..-~.-4--4---~--.L-4-.-~...~..4 ...... ~---~--4.-4.-.:...~....}..4.. }]. }.. L }..4...L ~.. ~...L4 ..... L.4..~...~...~. 4--.~.-.~--4-..
.... ~.-.~...*...~..T -~...$..-~ ...~ ..... ~...$...~...~. j...~...~--4...~ ....
.... T-~'"~--~'"?'~'"~'~---?'- ---~---~---T"-~'-'~'"?~---~-"~ ...... ~--?"T"'~"I'"~"?'T--?- '-'?"?'?'T"~"~'"~"~'"~'''~ "T"'?-":'"'-'~ ....... ?'?'"~ ...... ?'?"?"? ....... :'"~'"~"'? .......... w"?'"~'"~'"?'?'"?'"? ...... ~'"?'"?" ~" · '"~ "~'"~'"~ ....
.... H---H--+--H-H ..... H..HH...H..H~.~.`..~H"+~.H~..~...H..H..H-F.H~..~`~.F~-H~.~F+~.~.~...H~..~`~...H~..~.~+~.F~-~.+.~.~...t..~.~.~.~.~..~`"~..~.`H~.~f..~...~..~..`~
.... ~+-'H'H-H-H-~'"H'~-'"~'"H'H'H-HH~-H'~ ...... H'H'H'H't'"H'H'H'~ ....... H-H'~'"~'"~'"~'-~-'-~-"HI-~''-~''-H'H'~'''~-'-~''-H-H'~''-H~--~'''+''-~''-~-''H?''''?'I-' ~'''H''?''H'~'''H'H'H'~''I' ''~''' ~'''H'~'''t'''H'~'''~'''~ ....
.... H~"~"'HHHH~'~-Hb'~"~'"HH~"~"~-'~ ...... ~,~HHH"-+"HHHHHHHb'HH~"'~-'HHHH~-4-'-t"-~'"HHHHb'HH~ HHHHHH~'--HHHr"H'b'HHb'HHH~
9000
PROJECTION ON VERTICAL PLANE OF AZIMUTH 32 8CALEO IN VERTICAl. DEPTHS HORIZ SCALE = 1/SO0 IN/FT
WELL: 2W- 16
SURFACE LOCATION: 715' FNL, 29' FWL, S34, T12N, R9E, UM
I~ORIZONTAL PROJECTION
N0~TH 2S00 REF 70125
2000
]SOO
lOOO
soo
-5oo
-1ooo
SOUTH -IS00
-2000
NEST
SCALE = l/S00 IN/FT
-.-::.-+..?:-+..r4-i-+' .i--.~ ,-p-i--i~-½-4..-~--4-~- -4-4-45.-~-;.--4-.-+--4- ~--+-~.---~-.4-4-4.-~-+-.9--.--.;:-.-~--4--~--+--~.-4-*-~---;.--.--;--~---~*.4..-!-...~...*..4-.~ ...... ~-...5..~..-i-.t-..~-.-;...~. .......
: : : : i ! : ~ , i ~ : ; : : : : : : : : : ; : / ; : : : ; : : ; i ] : : ~ ~ i ~ ~ : [ : ~ i :
~ ~ ~ : i : : : ~ ' ' :' I : ~ ~ ~ ' ~ ~ ~ : ~ : ; ~ , : ; : : : -= ; ~ i ~ : ~ ~ ~ : ~ ~ I ~ ~ ~ ~ ~ : ~ i : : ; : : : / ~ :
~i-~t~+~H..~i--~.4-~-~.~i"~.~-~.+~+..?..~:~.~.~"+~:~.~;~+..~.+~;".~.`~?:~ *--?'.--t--:'--?:.---f--+.-..f-..:.--f---i---.+-*.,:**--..'*.-.~---l-.t-f-*k-~. ..... i*--f**-?*?'-.-l--,;---+.**.,.'-.-,.'... -.+-+.-.p+-l*-+..?.,.:.-+.- ~--;..-,.'..-,:..-,: ...... +...+...+.-.+ ....
"T'TT~'...- ?rTT' Tr..-...'-..?-" '~T ...-r'~-~ "...-r'?'~_'U'~:';~ -i--_.-T~ IT~TT- 3'-.-"'~-~3-'.--- '"-'..-~?~'r"?'E 'T..-i'_' :.Tr 1-.'.--'-"..ii~ T'~'T'T'" '"?"?
'TT,.?T?.TT-?-~-f~.-i-?~-CT--CU.T~.-C.'T~.~..;.~ i ~ ~ i ! i [ _.-" ~ i .:" '~~ C:' .:"PT-... ~ :'~'i I T ...'T'?-T '-F.; ? T-T"j~_p~.~._7'S: i' ~ ~-i-'-?'T':-"T.-"
'T .~"CU... T' i~ ...'-Ci.,~ i i-?'i-T'.;--T...~'-U..-'~-I- ~ "~.:'~' -U...'~. i [ i ~? i i ~ ~ '! U..-'UT""TT-T-?~'-..'-T'TT' 'T"~T' T" !-".,'"-T"':'-T-T'"
4-i-i--i-.: +¢-~-i-4----4-.-i--M-+.~&-;i-I ~4G-~-I -.-i--i44-...4-4-i .~.G i4.~4.4- --i- :;--~-i-4..~-;¢- -&i-~G-i-4G.;.4- -4-i.-i.g-~.~.'~. 4-.-.:,--4-4..- 4.-;>.:,-..i...
~-!N-++-½--~.-4-~-4--.-P+-P-P++-J-~d-~ff-t.-+.H-+- -i.:-.~d.-,.:-~-~-!--~+~-~--..-H-;'-+.-t-++-kk d.-i-k-P~-.+--'.:--+.-.."~--++-!~-..-.+.+.+d.-
--i-.-i--i.4-..: -~-4-i.4.....-L-i.4-4...I-.i...L.L.L.,,t'__L.L.i...;,_I_-L.L.i...L. 4-4.~4, ..... L.L.~..i ..... L.L-L.L., 1 : ~ ~ :L"~'"L'i"i-"' .4.4....L.,-L.,L4.4...L.L..-i.-L L_L....L.i...l...i.~ ...i...L.L.L.....i-.;...L.L.
: :' : : : : : : : i : ; ; : : : : : i : ~ ~ : : : ] ! i : ~ ii ". : : : : j : : : : - : : : : : : : : : : : ~ : : :
-I-.4-4 ~l_i ~-~ 4_Li_L_Li.4_M__ -.L~_:.__i-i-L4_L_,_i_.-~_£&-i._;___i...-L.L-;_I_~._-;- -~_ _L L.i ~ ,~ LL-i~-~i, L.M. -fi.L: -i ~ i~~ -.~4-; ~
4~-~.~-L~.i- _Li.iZ_~.LL,~_...~_.~_j~_.~...~ ,._;.~_~ _~..!~.L _.~ 4.._LL i.. _LLi ~ ~ ~.:~ .w..,o.~_~_~.~_~..~,..~,~..._LL~...LI .~~..~...; .,~..
-~¥-i---;~-t-~-~~ ~ ~-!-~.~ ~-~--~-~,-.~--~-~--~ ~-H--i ~i-.~-+H~-~--H~P-~-~-+~-~t i-+-~ ..... H+~-i-J.-H~H ..... ~-'] +'~-";'.'"~"'
'~:-~-T":.'~:: ~ :""TT:"~' :'q'-~'~:'~' : T'.-'~'.-'~ "~.-'"~-~T-'-"~Tq'~:- 'T'T-T-! .... ~:"~-?-~--T~.--T"T'""'T-T-T"~-~·
---~--~---i-.4~:::; --*-~--.i-~.---4---::;: , -*?.--:.----i--~.-:::: ~4,--~---~--~.:::: -:-4-'?'-'~4'-'L*-i-*'~"4'::: : : : 4.-: -~.-.-~-?-~.-.[--~4..*.~-.~.:;;: : : ; ; ...... .~.4-~,-4-:::: 4--}*---~:.: ..-~-: .-~,.: ~.: .~-: ..~.-.~-:: ,~--':~.. .... .~,~:. -~-,~--:...,.~: 4: 4--'...: ~ -4: ,i.: ~,: 4: t' -~: 4-: *,~,.: ~..:
-~-...'---~--¢--~--~ ,-~-T-, ,~,'? :--~...---?.-'-r¢~-:'~;~ F-.;~t~'~-'~'t;'-,~-T".?T-~ .... t...i...t..~-k~.~-t.:~~-~.-r~¢t.t~-t.-i-.~t...-tt.t...t......-t;..t..'.:-~-T-e~?.~-
?'T-Fr'-"T'T-.-:"T"!'T'?T'~TTT'.?~~'- ['".:'"-:.-TTT'T"':-.'T-7' ~T'r'TTT":-.:T?;'"~ .... ~;T".::TrTT'~-'..'"'!"'~. '1 '~-'.T--'..'"'-?'TT'~-'TT'~-'~ ....... ;'"'!TtTVT':?"'?'''
-.i--~_.a. _.i--~. _.;._-~.-L.L.i,~_;_-L~_..-aJ_.L., .~..-M ..... -;-~..-,-~.~;.4...i.. _i._;.._i._ Li..-i...i_ ...':,-.i_-,_TTT..T_.M.....4..-L.~_i...;..;_;......i.-i...¢..-L
-~'~-'i'"i'"--LL-L.i---J-J-L.'i--~-~.---L'-k;.i.......
-+.-~.-+.~-+-.i.-4-4-. !--~..~-.l...~-~-i-~ .-~--;--;-.~--+.-~--.:.-;...~-..-.~+.4-.i-4-i--:; .~--!-4. t4..~ 4-~J.~.~4-;-~.-~-~-4-.',--[-;--~-~-..; ....... ~...;...~.~-~-..~..-;..~...~... -.~--;..~-4-,-.~...~..-~...
-++"::'".~+++'i'+' !"~'::'"-}-i"i'++~'"~-'-;'"H"-;;'"H'+'i--'~'"-~".:'+-H'-?=.'-i"'~"-i ...... .;-~+4--~--4----~---.;."--..;-4---9--,----~4--,.;-~-.-.-;-.~-~:-+4-4..-~,..,~ ...... -~.~..-i.--l...~l...l-..~-.4---
--e+--!--+-i-+-~-e-w- ~--~--+-++.-+:--~-?:-" -'">+~" :'+'1'-+-+"+'+'"--+-+ .-+~.'-+-.e-,:-~-.-~ ...... .:,: .--9-?"- .-i-.=,-4-4- -;...~...;_..;...' 4-..;.4-.;.......~-~...i..-L....;..;..i-;... -.~-4...~~4...[-,.-'.4...~.4...
-.i.-i--~..-~..-~_.i_i--.~.4._~ ~ ~-4.-~-4..-:. !.-$-.i---~i-....4.4.4-,.~.T4.4.-4.4-...4-~-i.4-~i-~-i-~..',. .... ...... ~t=' = ~' _.~..4...;_,!~ _ ,L~ ~ ~ ~ i ~ ~ i~! -[ ,~ ~..LJ i ,L i.~ ~. ...... ;4 ~ 4 .i-..i ~ "~'~ ~ ~ ~ !- ~'4'4 -i.-~..~.zJ...
'- .'~-?--?"~'."T~.." .'~-?~?-' --?-'~'-~-.- '?-~'".~"?--~'"?-' -"~.'"?"?".'r-'+'-.'~'-?'-'~'~'-' '-?'-:"?"?--*"':'"?'?'"? .... .'~' .'~-??-'['~'.-?"~.'"~--?'-?-?-'? ....~"-'?"-?'?-?"- "' .'r-?"'~"-? ..... ?"'.~-'?-?'" -'?'"?'"'~-~"T"?'"?~'?~'? ....
--.~--i:'----.."--+- --¥-i-4-¥---;:-+~-~---t--4-.:---+-~--¥---:'--+,¥- -~4..~ ..... .~--4."~.--+-~.-4-!--- .;-4-~---~-i-4-?"-.-¥-i-.4-.:...~-4-.~...-p.;..+.....i-,.:.--~-.+.....,.:~.~...~--~ ....... ,~..+~,:'-.i...t~~...,~-+..~ ....
....
:::::::::::::::::::::: ===================== ::::::::::::::::::::::: :::::::::::::::::::::: :::::::::::::::::::::::::::::::: ::::::::::::::::::::::::::::::::: :::::::::::::::::::::::::::::::::::::::::
"'.::"?'"'.--'"'::--'r'T"'.;-":.-'T' '"~'T'r'r1'":-"T'.'.;'"?.: ..... ?..'":-;'".?'"'--"T'~"?'~'" 'T'?"--~-r?T-?'": ..... :--'"?T'-.:T"..'-?'"?"? ...... ..?'""..'T'~T'~'"?'~'" "':T?"'?'T?..'T"..-""..- ....... ?"'..."'?'r"~'":'"?"? ....
-LL~.?.4_~i_ -LL;...L.I..~...L 'LL:..~...i--L~.,-.L-Li--i...i- -L..~. _.Z~.~_ ~..S...LLLi...a ..... ~ i..~..q...;..~...L~.., i...;._;...~_.~..i_~_.~..~..L ...LLLi..i.L:...i...~...:
: : c : : : : : = : : I = :, .~_; = : : .' = : : : ; : : : = = = : = : ,"'C'~ : Z! : : : *" = = = 7 ' = : = ' = = = ; I : ; : i
-T--.~.---*--~-,-.~..-~.~-4---4...~--~....~.-.~.--~..-.'...~...;.-,-.4--~-4--4 -4--4 ; --4-4--4--4- ' ' 4--4--,---;--~.4--~ --4--4--.~-.-4--.---~---~--4-.-~-.----~--4---4---~-- --4..,4-,.4..-~-...-.~..'4.-'~---~.....-~.-4--;.--4.--..-4-.'~-,',~-4.-~
_~.i._i._.~.._.~_i._~_;_ ~.i.,!_!.~a~_--'~_~.:...;_:-~-i-~-~ ;~-~-. ~-~-4-.¢ ~ '-~-.~-~.x-~..,4._ ...~_~..x~.~......1.--;-.-~-4-[-~.-~-.~-.~...!.4...4...~--.~.-...¢~~.~..4...I~.~...;4~.~...
-4-L.-~A.--&..~L&...4.-.~-L.L.t~..4-..~...._.;_~&_~.4-,-44- -L~ ~ ! 4-~_-~.4-&.-~_ _~.Lx4.....-~...~..& ;. '...~-.-~_~ 4 ...... ;.~~...~.4...~ ....... ~...~-.~... -~...~...:.4 ....... ~...~~.~.4-.
.-!--.~' .'~-?- .'-P~."~." .-~--'~.-~ .-~i--I--'i~-~.'-! '"?'?-~. -.~' - ."~."r'~..- .-'!--~. ~.-?-- ' .-P~."~.~.~--'--'.~-'~-'?-*.-'T-'~---?-'~.-~-. .-'P--?'-'?-'?.4-..'~..-?---~--~ ....... ~'"?-'?-~"l'"'?'?'"'r-'?'" '"?-'~.""~"'~'"! '"~'"?'"?'"'r.'-
q-i---i---?;.--.--i---½-?"--.:--~-+-..~-..i-.- ...~-i-..i-4--..4...?:-~-.i- -4-..,.".-4."-.i-. -+.-~4 +.+4...-.4-..!.-4.4.4...i..+.-~-i.-....-;.-.~..+4..+..~...i...~,4 ...... ~..-,5..~.4 ...... ~...~...+...; ...... ~...~...{.--~ ....... ~...i...,."...,~...
.-+--~-..,,-~-.,,-.~..... ..... ~,,-. _~ ~..,~.~ _._.,-.~ ,:-. --,,.-~-,....~ ~...~_ ...,~.,,-..._..~. ~...~. ~ ...... ,...? .;-. -~ ~,~ .~. ~ ..,-.., 4 .- --+.-,....-; -,...~..,-~, ~.-,,.., 4......,-......, .......
: : : : : ; : ; : : : : : : ! I : : : ; .' : : ; : : : : : : : ; : : : ; : : ! · ; : : : : : : : : : : : : : : ; : : : ' : : : :
~--!'-T"i'-]-:.~.?~-T-''i'''~'-I'T.. 'l-~--i-i'..~T'~ "..'!-'~Pi."-t i'T-f" ..-P~'f'~"j~- 'T~-i' "?T'~'"'.;'--'~'-~" "t'T-~'"'~ ....... t"~'"i"T'~'"?'T"t"~ ...... '.i~'~"'~'"i ...... '.:'"t'~T
"~-..'-+-.-T"I'"~-';'"..~.? ...... .-'~..+'"~"T-I"T-.~'?-'?-~"T/- '~-T"?-I'~'?'-?-T-~'' 'T'T ..-I':':':':':':'~-.. ,T"!'","'!"--'~'"?-T-F'i'"?.'"?'"~'-?"~"-:~".."'~-?'"-'T"~'"?'"? ....... ~--I"'?'"?'","T";'"~'"?'" -.?'"T"T"~'",'"T"?"'?'"~'"
?--i--4---i-.+-'-.-i---i-.f.-i ..... {---i---i-.-4--- --+--{-i--{--- ---i.--i----:'--+-t.--!..-?'---i..-i ..... i---T.-+--i--- ---~..--{-i.--?' ..... {--'-'}.'---{----.:-- .--'~--'{'----;'.-..'---.---4-i--4---i---i'--~-'-~"-~--~; ....... {-'-i---!--.~'-'i"-i'-'~---~'.-'?-' -..-~...!...i.--i .......
~'*...".-'H'"tS'"H-i'"'-'i'"i'-f't'];-..:-!d'ff-:]-'ff..''..-'t'H-H~-k' '-ffiffff~"H'+'ff'-'ff'"f'f"H"H"-..:-"~;-'''H~'''f''H'''H'''''''H'''H'''?'H'''H''''-H-'H''T''t''fft''t''
~i:T:i-':~:~::~.:.-.;:.::-';T:i::4~::;:¥k--: :.--.:-:::i:::~'::f.~:i:.'~::;.':a~: ~'~:~.t..-;~¥:;::;::;:::i: :::::::::::::::::::::::::::: :::::::::::::::::::::::::::::::::: :::::::::::::::::::::::::::::::::::::::: ::::::::::::::::::::::::::::::::::::
4.4.,: ..'.-i.-i-: ...... ~.~:.4-4,....-!-~4.4 .... ~...~,_;-.' ...... ~..-;-~.~-.. ~-;..~-4,.4 .4.4..4,..~....4...~...~,4...4.4...~...~...;..4...i...~,..~-..~..4-;...,~...,} ...... ~...~...;.-,..,5..~~.:...?...~....i.......~.,.~...~-..~....1...~...,}...~.4...
-1500 -1000 -S00 0 SO0 1000 IS00 2000EAST
Suggested form to be inserted in each "Active" well folder to check
for timely compliance with our regulations.
'OPERATOR, W~L-L N~ME AND ~U~BER
Reports and Materials to be received by: r~~ ~/~i Date
Required Date Received Remarks
Completion Report
Well History y~.~,.~ ~ .__~~~` ~~~.
Samples
Mud Log
Core Ch~ps
Core DescrSpt~on
. .
Registered Surve .
~-.~.
in'c i faan.i~=-'~'S urvey
Directional Survey
Drill Stem Test Reports
Log Run ..... x .~~
.... : . ~' ,-_¢.. , ~: . :-~ .~ -~ ~ ~ ~ '
Digitized 'Data
, _, _
ARCO Alaska, Inb~.~
Post Office Box 100360
Anchorage, Alaska 99510
Telephone 907 276 1215
February 12, 1985
Mr. C. V. Chatterton
Commissioner
State of Alaska
Alaska Oil & Gas Conservation
Commission
3001 Porcupine Drive
Anchorage, AK 99501
SUBJECT: State Reports
Dear Mr. Chatterton:
Enclosed are the January monthly
reports
for
the
6-5 2C-13 2U-13
11-15 2C-14 2U-14
17-12 2E-9 2U-15
17-13 1Q-9 2U-16
L1-9 1Q-10 2W-13
[2-30 1Q-11 2w-14
If you have any questions, please call me at
Sincerely,
Gruber
Associate Engineer
JG/tw
GRU4/L143
Enclosures
following wells:
2W-15
2W-16
WSP-4
WSP-8I
263-4944.
RECEIVED
FEB
Alaska Oil & Gas-Cons. Comrnlssiori
Anchorage
ARCO Alaska, Inc. is a Subsidiary of AllanticRichfieldCompany
~ - ~ STATE OF ALASKA
ALASKA ~ AND GAS CONSERVATION CO~/IISSION
MONTHLY REPORT OF DRILLING AND WORKOVER OPERATIONS
· Drilling wellX~ Workover operation []
2. Name of operator 7. Permit No.
ARCO Alaska, Inc. 84-239
3. Address 8. APl Number
P. O. Box 100360, Anchorage, AK 99510 50- 029-21255
4. Location of Well
at surface
717' FNL, 31 ' FWL, Sec.34, T12N, R9E, UM
5. Elevation in feet (indicate KB, DF, etc.)
95' RKB
I6. Lease Designation and Serial No.
ADL 25642
9. Unit or Lease Name
Kuparuk River Unit
10. Well No.
2W-16
11. Field and Pool
Kuparuk River Field
Kuparuk River 0il Pool
For the Month of January ,19 85
12. Depth at end of month, footage drilled, fishing jobs, directional drilling problems, spud date, remarks
Spudded well ~ 0300 hfs, 01/24/85. Drld 12-1/4" hole to 3172'. Ran, cmtd, & tstd 9-5/8"
csg. Drld 8-1/2" hole to 7022'TD as of 01/28/85. Ran OH logs. Ran, cmtd , & tstd 7"
csg. PBTD = 6994'. Displaced to brine. Inject mud and diesel into 9-5/8" x 7" annulus.
Secured well & RR as of 1400 hfs, 01/30/85.
13. Casing or liner ru.n and quantities of cement, results of pressure tests
16", 62.5#, H-40 weld conductor set @ 93'. Cmtd w/248 sx CS I1.
9-5/8", 36.0#, J-55 BTC csg w/FS ~ 3160'. Cmtd w/700 sx AS III + 440 sx Class "6" cmt.
7", 26.0#, J-55, BTC csg w/FS ~ 7084'. Cmtd w/359 sx Class "G" cmt.
14. Coring resume and brief description
NONE
15. Logs run and depth where run DIL/SP/SFL/Microlog/GR/Cal f/7017' - 3160'
LDT/CNL f/7017' - 6400'; 5600' - 5400', and 3600r' - 3160'
FDC/GR f/7017' - 6400' 5600' - 5400' 4000' - 3950', 3500' - 3160'
6. DST data, perforating data, shows of H2S, miscellaneous data
N/A
Alaska 0il & Gas Cons, Anch0rsge
17. I hereby certify that the foregoing is true and correct to the best of my knowledge.
NOTE--ReporQon this form is required for each calendar month, regardless of the status of operations, and must be filed in duplicate with the Alaska
Oil and Gas Conservation Commission by the 15th of the succeeding month, unless otherwise directed.
Form 10~,04 JMM/MR56
Submit in duplicate
December 19, 1984
Mr. Jeffrey B. Kewin
Area Drilling Engineer
ARCO Alaska, Inc.
P. O. Box 100360
Anchorage, Alaska 99510-0360
Re: Kuparuk River Unit 2W- 16
ARCO Alaska, Inc.
Permit No. 84-239
Sur. Loc. 717' FNL, 31' FWL, Sec. 34, Ti2N, R9E,
Btmhole Loc. 1508' FSL, i442' F%,r~, Sec. 27, T12N, R9E, UM.
Dear Mr. Kewin:
Enclosed is the approved application for permit to drill the
above referenced well.
If coring is conducted, a one cubic inch chip from each foot of
recovered core is required. Samples of well cuttings and a mud
log are not required. A continuous directional survey is
required as per 20 AAC 25.050(b)(5). If available, a tape
containing the digitized log information shall be submitted on
all logs for copying except experimental logs, velocity surveys
and dipmeter surveys.
Many rivers in Alaska and their drainage systems have been
classified as important for the spawning or migration of
anadromous fish. Operations in these areas are subject to
AS 16.05.870 and the regulations promulgated thereunder (Title 5,
Alaska Administrative Code). Prior to commencing operations you
may be contacted by the Habitat'Coordinator's Office, Department
of Fish and Game.
Pollution of any waters of the State is prohibited by AS 46,
Chapter 3, Article 7 and the regulations promulgated thereunder
(Title 18, Alaska Adminigtratlve Code, Chapter 70) and by the
Federal Water Pollution Control Act, as amended. Prior to
commencing opera~ions'you may be contacted by'a representative of
the Department of Environmental Conservation.
To aid us in scheduling field work, please notify this office 24
hours prior to commencing installation of the blowout prevention
Jeffrey B. Kewin
Kuparuk River Unit, 2W-16
-2- December 19, !984
equipment so that a representative of the Commission may be
present to witness testing of the equipment before the surface
casing shoe is drilled. W~ere a diverter system is required,
please also notify this office 24 hours prior to commencing
equipment installation so that the Commission may witness testing
before drilling below the shoe of the conductor pipe.
In the event of suspension or abandonment, please give this
office adequate advance notification so that we may have a
witness present.
V~e~r~_ truly yo.,urs,
C. V. Chatterton
Cha±rraan of
Alaska 0-il and Gas Conservat±on Commission
BY OPd)ER OF THE COI~R~ISSION
Enclosure
CC:
Department of Fish & Game, Habitat Section w/o encl.
Department of Environmental Conservation w/o encl.
Doug L. Lowery
ARCO Alaska, Inc.
Post Office ~..--_,-x 100360
Anchorage, Alaska 99510
Telephone 907 276 1215
December 5, 1984
Mr. C. V. Chatterton
Commissioner
State of Alaska
Alaska Oil & Gas Conservation
Commission
3001 Porcupine Drive
Anchorage, AK 99501
SUBJECT: Kuparuk 2W-16
Dear Mr. Chatterton:
Enclosed are:
An application for Permit to Drill Kuparuk 2W-16, along with
a $100 application fee
Diagrams showing the proposed horizontal and vertical
projections of the wellbore
A proximity plat
A diagram and description of the surface hole diverter
system
o A diagram and description of the BOP equipment
We estimate spudding this well on January 19, 1985.
any questions, please call me at 263-4970.
Sincerely,
J. B. Kew in ~~ '-~-
Area Drilling Engineer
JBK/TEM/tw
PD/L04
Attachments
If you have
RECEIVED
REEEIVED OEC
~LL~'~' ~?' i 7 ~[~i~ Alaska Oil & Gas Cons. CommissJo~
Anchorage
A~ask, Oi~ & ~.s Cons. Commission
ARCO Alaska, Inc, is a Subsidiary of AtlanticRichfieldCompany
STATE OF ALASKA
ALASKA"OIL AND GAS CONSERVATION COWlMISSION
PERMIT TO DRILL
20 AAC 25.005
la. Type of work.
DRILL [~
REDRILL []
DEEPEN []
lb. Type of well
EXPLORATORY []
DEVELOPMENT OIL I~X
DEVELOPMENT GAS []
2. Name of operator
ARCO Alaska, Inc.
3. Address
P. 0. Box 100360, Anchorage, Alaska 99510
4. Location of well at surface
717' FNL, 31' FWL, Sec.34, T12N, RgE, UH (Approx.)
At top of proposed producing interval
1240' FSL, 1272' FWL, Sec.27, T12N, RgE, UM
At total depth
1508' FSL, 1442' FWL, Sec.27, T12N, RgE, UM
9. Unit or lease name
Kuparuk River Unit
10. Well number
2W-16
11. Field and pool
Kuparuk River Field
Kuparuk River 0il Pool
5. Elevation in feet (indicate KB, DF etc.) I 6. Lease designation and serial no.
RKB 95', PAD 65' I ADL 25642 ALK 257B
12. Bond information (see 20 AAC 25.025) Federal Insurance Company
Type Statewide Surety and/or number #8088-26-27 Amount $500,000
13. Distance and direction from nearest town 15. Distance to nearest drilling or completed
30 mi. NW of Deadhorse 2W-15well 60' ~ surface feet
16. Proposed depth (MD & TVD)
7064' MD, 6246' TVD
18. Approximate spud date
01/19/85
19. If deviated (see 20 AAC 25.050) 2727 psig@ 80°F Surface
KICK OFF POINT 2014 feet. 3132 psig@. I~OR.c, ft. TD (TVD)
[21
14. Distance to nearest property or lease line
miles 31' ~ surface feet
17. Number of acres in lease
feet 2560
20. Anticipated pressures
MAXIMUM HOLE ANGLE 31 o (see 20AAC25.035 (c) (2)
SIZE
Proposed Casing, Liner and Cementing Program
CASING AND LINER SETTING DEPTH QUANTITY OF CEMENT
Casing Weight Grade Coupling Length MD TOP TVD MD BOTTOM TVD (include stage data)
16" 62.5# H-40 Weld 80' 29' I 29' 109'11 109' · 200 cf
9-5/8" 36.0# J-55 BTC ~ 29' I 29' 3218'I 3140' 700 sx AS III &
HF-ERW I
,,~1~ ~ I 440 sx Class G
7" 26.0# J-55 BTC ~ 28'
I 28' 7064'1 6246' 250 sx Class G blend
HF-ERW I 17~~, I I
22. Describe proposed program: ~1~/i1~-( ~J~'~l~ I I
ARCO Alaska, Inc., proposes to drill a Kuparuk River Field development well to approximately 7064' MD (6246'
TVD). A 20", 2000 psi annular diverter will be installed on the 16" conductor while drilling the surface hole.
The 9-5/8" casing will be set through the West Sak sands at approximately 3218' MD(3140' TVD). A 1:~-5/8", 5000
psi, RSRRA BOPE stack will be installed on the 9-5/8" surface pipe. It will be tested upon installation and
weekly thereafter. Test pressure will be 3000 psig (1800 psi for annular). Expected maximum surface pressure is
2727 psi. Pressure calculations are based on latest reservoir pressure. Surface pressure is calculated with an
unexpanded gas bubble at surface, including temperature effects. Selected intervals will be logged. The well
will be completed by the workover rig with 3-1/2", 9.2#, J-55, 8rd tbg. Non-freezing fluids will be left in
uncemented annuli through the permafrost interval. Selected intervals will be perforated within the Kuparuk
formation and reported on subsequent reports. A downhole safety valve will be (see attached sheet)
!Hole
[24"
12-1/4"
!8-1/2"
23. I hereby certify that the foregoing is true and correct to the best of my knowledge
T hespacebelowforO~mmissionuse ~ I~P~-~ TITLE Drilling Engineer
CONDITIONS OF APPROVAL
Samples required
I--lYES
Permit number
APPROVED BY
Form 10-401
Mud log required I Directional Survey required I APl number
~ App roval~.fj[ate I
~v/_ q..,.'~q .~ /1-'~_,,~]. 9 / 8~4 ,/~ SEE COVER LETTER FOR OTHER REOUIREMENTS
~ /[ / / ~~/~_~ ,COmm,SS,ONER DATE December 19, 1984
~ / ~/~~ by order of the Comm,ss,on
PD/PD0~ Submit in triplicate
lbS[0~
PERMIT TO DRILL
2W-16
installed and tested upon completion of the job. 2W-16 will be 60' away from 2W-15 at the surface. There are
no other close wellbores or crossings anywhere downhole. Top of cement for the production string will be placed
at 5526'MD, approximately IO00'MD above the top of the Kuparuk Sands. Reserve pit fluids will be disposed of
down the 9-5/8" x 7" annulus. The 9-5/8" x 7" annulus will be left with a non-freezing fluid during any
interruptions in the disposal process. After the workover rig has moved off location, this well will be
fracture stimulated.
RECEIVED
Alaska Oil & Gas Cons. Commissi0n
Anch0rag9
RECEIVED
DEC 1
Alaska Oil & Gas Cons. commission
Anchorage
....... ~ ......... PER J ..... ....... .........
< .~EOC-- (CSO-PT) ---TV_iD.=3]'40-TMD=~2'IB--DEP=367-: ..... ~ .................. : .... : ......
"~' '~ ............. ' -.- ~ ........ .'- ............... ~ ..... 1 ....... i ..... : | - ' ' .--' ....
...... ~ ....... ~ ........ ~. ......... .t ....... ;--: ....... t~ .......... i .... '-='rD' '(LOB'-PTJ' T-VD-624~ TMD=?O65iDEP=26:35-- i-
:N'
I
I~LASKA ~-'~-I NC
' WEEL-.NO
{
':~L1001
' ..... I" .24
. . . ~ ...... : . . ~ ........... { ....
......... ~ ~_~ JL.i i.i ....... ~ i ....
-Jr
II
,
.... SEC~ 2... ReE
........ i ...... f ....... :- ....
_.
, . : ! I ...... [
~ -~ ! .....
·
' : :I = }
~; .............. ~ .....
: = t : i
- { .~ .......
i
, { . , ~ , { . , . -
. . , ,~ , ~ ,
f ............ '--~-'-:--: ..... I ......... :f .......... i-'~ -- '- ~ '"
= . ......t___ ~_. L~ ~
-~2o~--FS~-.~20'{ ~--~ ........ ;--
-~ORTH 2035 ~-i -: -' ' ...... i ........................ ~ -
...... ~ ....... i--- i ..
~ - ~ "~'~ .~ ......
, . ....
~-- ~ "{'--~ .......
{ , . t ....... ~ ....... t ....... '
._{ ........ ; ...... - .......... ; .........~ ....... ~ .-
' ~a~O]l ssion ....... .... 1,. .......
~.~ ........ ~---- ~- ~-: ....... I ........ ~-.-
Surface Diverter Svst~
6.
1. 16"-2000 ps( Tankco stmrting heac~.
Tankco quick connect assy.
). 1G" X 20" 2000 psi double stuOOeO adapter.
20" 2000 psi c)rilling spool ./lO" si~e outlets.
lO" b~ll v~lves~ hyor~ulically ~ctumteU~ n/lO" lines
to reserve' pit. Valves to open auto~tica))y upon
clo~ure of annular preventer.
20" 2000 psi ennul~r preventer.
20" bell ni~le.
~aintenance & ODera~iOn
1. Upon initial installation close annular preventer and
verify ~hat bail valves have oDeneo properly.
2. Close annular preventer an¢ b)o- air through Civerter
lines every 12 hours.
). Close annular preventer in the event thmt gas or fluid
~lo~ to surface (s ~etecteU. If necess,ry, ~nuall?
overrioe and close ball valve tm upwind diverter line.
Do not shut in ~ll under any circ~nstmnces.
, m,
1 6" Conductor
i
7
G
5
4
3
2
--~ DIAQUI~ #1 ·
1~-5/8' 5000 PSI ~A BOP STACK
,>
ACCL~/~TCR. CAPACITY TEST
I. O-ECl( At~ FILL ~TOR RESERVOIR TO PROPER
LEVEL WITH HYDRALLIC FLUID,
2. ~ THAT ~ATC~ ~ IS ~ PSI WITH
1500 PSI ~TREAM CF THE REGU. ATCI~.
3. ~ TIKE..,, T)-EN CLt"J6~'__ AIL UNITS SINLLTAt~CUSLY
AJ~) RE~ T~E TIME AN) PI~ REM~INIlkG AFTER
ALL UNITS ARE CLOEUED WITH 04ARGI~ PUVP CFF.
4. RECORD ON NN3C REPORT, THE ACCEPTAB. E LCIAER LIMIT
IS 45 SE~ CLOSING TIM~ ~ 1200 PSI REMAINING
1~-5/8" BOP STACK T[ST
FILL BCP STACK AN3 CI-O(E ~FCI. D WI'rH ~CTIC
DIESEL.
(]..ECl< THAT ALL LOCK ~ ~ IN Iq~I. LHE/~ AI~
FLLLY RETRAC'TED, SEAT TEST PLUG IN I~EI_LFE/~
WITH RI..N~ING JT ~ FaJq IN L~ SC~
3, CL_cJ~__ AhN.,L/~ PREVE~ AND ~ KILL N~
LI~E VALVES ADJA(:E. NT TO BCP STACK, ALL OTI-ER
VALVES AI~ ~ ~ BE 0PE~
4, PRESSLRE UP TO 250 PS! A~ HCLD FOR IO M[N, ZN-
~ PRESSLRE TO ~ PS[ N~ H~LD FOR IO MIN.
~FED PRE~ TO 0 P~I.
LIllE VALVES. CLOSE TCP PIPE RANB ~ HCR VALVES
CN Kill ~ CHO<E LI~ES.
6,TEST TO 250 PSI ~ 5030 PSI AS IN STEP 4.
7. CCl~rINJ~ TESTIKG ALL VALVES, LIDES~ AhD 043(ES
WITH A 250 PSI LCMN AJ~D 3000 PS! HIGH. TEST AS IN
STEP 4. DO I~13T P~E~=4JqE TES"T ANY ~ THAT )~
NOT A FULL CLOSIh~ POSITIVE SEAL CHOKE. ChLY
8. CI=EN TCP PIPE RAMS AN) CLOSE BOTTOM PIPE
TEST BOTTOM PIPE RAM~ TO 250 PSI ~ 5000 PSI.
9. OPEN BOTTOM PIPE RNVB. BACK OUT RUN, NO JT
I0. CLOSE BLIN:) RAIv~ ~ TEST TO 250 PSI ~ 3000
PSI.
MM~IF~D AN~ LIt4~S ARE FLI.L CF NON-FREEZING
FLUID. SET ALL VALVES IN CRILLING POSITICN.
12. TEST STAIqCPIPE VALVF_~ KELLY, KELLY C(X](S, DRILL
PIPE SAFETY VALVE, AN3 INSIEE BOP TO Z50 PSI
~XX) PSI.
I~ RECORD TEST II~F~TION CN BLORIIff PREVENT~ 1EST
FORI~& SIGI~ AJ~) SEI~D TO CRILLING
14. PERFCI~4 CCIvlM_ETE BOPE TEST AFTER NIPPLING UP
VEEKLY ~AFTER FLNCTIOkigILLY OPERATE B(~ DAILY.
510084001i
i~.V I
CHECK LIST FOR NEW WELL PERMITS
Company
Lease & Well No.
ITEM APPROVE DATE
(1) Fee
(2) Loc
thru 8)
1. Is
e
3.
4.
5.
6.
7.
8.
(3) Admin(~~ /%-/~ ~'Y 9.
(9z thru 12) 0 · 10.
(10 and 19) f 12.
(13 thru 21) / 14.
15.
16.
17.
18.
19.
20.
21.
YES NO
(22 thru '26~
the permit fee attaChed .........................................
Is well to be located in a defined'pool ...........................
Is well located proper distance from property line ..............
Is well located proper distance from other wells ...........
Is sufficient undedicated acreage available in this P°°l iii~i
Is well to be deviated and is wellbore plat included .... ' ...'~" .~ "
Is operator the only affected party .................................
Can permit be approved before ten-day wait ..........................
Does operator have a bond in force ......................
Is a conservation order needed .......................
Is administrative approval needed ...................................
Is the lease number appropriate /~
eeeleeeeeeeee®eeee.eeeeeeeeeeeeeeee.®<
Is conductor string provided ........................................
Is enough cement used to circulate on conductor and surface .........
Will cement tie in surface and intermediate or production strings ...
Will cement cover all known productive horizons ....
Will surface casing protect fresh water zones ....
Will all casing give adequate safety in collapse, tension and burst..
Is this well to be kicked off from an existing wellbore .............
Is old wellbore abandonment procedure included on 10-403 ............
Is adequate wellbore separation proposed ............................
22 Is a diverter system required '
· .eeeeeeeee®e.eeeeeeeeeeeeeeeeeeeeeeeeee
2S. Are necessary diagrams of diverter and BOP equipment attached .......
24. Does BOPE have sufficient pressure rating - Test to .~,~w~ , psig ..
25. Does the choke manifold comply w/AP1 RP-SS (Feb.78) ..................
26. Is the presence of H2S gas probable .................................
27. Additional requirements .............................................
REMARKS
iV b 77 s ~¢ /~ / v-r 6 o .....
Additional Remarks:
Geology,s_ E~ngineering:
WVA--------/ JKT~HJH ~
rev: 10/29/84
6. CKLT
POOL
INITIAL
CLASS STATUS
GEO.
AREA
UNIT
NO.
///C o
ON/OFF
SHORE
Well History File
APPENDIX
Information of detailed nature that is not
particularly germane to the Well Permitting Process
but is part of the history, file.
To improve the readability of the Well History file and to
simplify finding information, information of this
nature is accumulated at the end of the file under APPENDIX.
No special effort has been made to chronologically
organize this category of information.
bis
VERIFICATION
,VP Oln,H09. VEPIFICATIDN LISq"ING PAGE
~EPvIcF 5~AU.E
)ATE :R5/06/29
)RIGIN :FS1A
~APE NA~i~ :
~O~l'.f I N~ATION ~
~OMMENTS :LIBRARY TAPE
~'i I,,E N~MF :EDT. T ,001
~ERVIC~ ~'A~E :
)A. TE :
~AXIMUM [,,EMGTH : 1024
~It.,E TYPE
~* INFOR~ATION RECORDS
~N~H CD,TENTS
,9N : ARCD ALASKA iNC..
~'N : KUPARUK
FN : ~UPA~UK ~IVER
RAN~: 9E
TOWN:
~ECT: 34
COUN,: ~ORTH SLOP~
~TAT,: ALASKA
CTRY: USA
MN~M cO~!T~N?S
PRES:
000 000 01,8 065
000 000 014 065
000 000 01,4 065'
000 000 002 065
000 000 004 065
000 000 002 065
000 000 012 065
000 000 006 065
000 000 004 065
UNIT TYPE CATE SIZE CODE
** CO~,t~EP,YTS ** 000 000 001 065
,VP 010.,~0~ VERIFICA'rlON LTSq~ING PAGE
SCHLLIMBFRf, ER
ALASKA COMPUTING CENTER
.'O~.P~NY : ATL~.NTIC ~ICHFI~bP CO~.~P~NY
;ELL = KIIPARJJK 2W-~6
~I~LD : KUPARUK
~OUNTY : N~HTH SLOPE BOROIJGH
;TATR : AT.ASKA
~0~ NU~,~B~H AT ACC: 704]6
{UN ~ONE, DA~E LOGGED: 2B-JAM-~5
,DP: CRW
]ASI~G : 9.625" M 36.00' - ~IT SIZE : 8,5" TO 7022'
~YPE FI.UTI) = XC'POLY~E~
)ENSITY = 10.2 LB/G RM = 4,10 ~ 72.0 DF
: g.O RMC : 3.37 ~ 7~0 DF
r4UID LOSS = 6.7 C3 ~M AT BHT = 2.38 ~ ~2 .0 DF
~ATRIX SANDSTO~'E
*******************************************************************************
:¥P 010.~0~ VERIFICATION LISTING PAGE 3
* SCHLUMRERGER LOGS INCL!)DED WITH THTS MAGNETIC TAPE:
,
* DUAL IMDUCTION SPHER?CAL~,Y FOCUSSED bOG COIL)
* FOR~4aT!DN DENSITY COMPENSATED LOG (FDN)
* LITHO DENSITY CO~PENSA~EB LOG (bDT)
* ~ICROh~TERLOG (ELL)
DATA FORMAT RECORD
?NTRY BL, OCMS
~YPE SIZE ~EPR CODE ENTRY
2 1 66 0
8 4 73 60
9 4 65 .lin
~6 ! 66 1
0 1 66 0
)ATU~ SPECIFICATION BDOC~S
~N~M S~RVlCE SERVICE UNIT API API API API FILE SIZE
PROCESS
....... LOG "YE CODE (OCTAL}
I...P,,, C5~$$ ~OD NO,
ORDER # FT O0 000 O0 0 0 4 1 68 00000000000000
OHM~ O0 ~20 01, 0 0 4 1 68 00000000000000
OHMM O0 ~20 46 0 0 4 I 68 00000000000000
OHMM O0 1,20 44 0 O 4 i 68 00000000000000
~V' O0 010 O1 0 0 4 1, 68 00000000000000
GAPI O0 310 01 0 0 4 I 68 00000000000000
~APi O0 310 O1 0 0 4. 1 68 00000000000000
TN O0 PSO Ol 0 0 4 1 68 00000000000000
G/C3 O0 350 02 0 0 4 I 68 00000000000000
~/C3 O0 356 O! 0 0 4 1 68 00000000000000
GAPI O0 310 O1 0 0 4 1 GO 00000000000000
,VP 010..02 vEP[FICATiDN ijTSTIMG PAGE 4
}ALI
~HfDB T,DT
)RI40 I,DT G/C3 00 356
{R~T I, DT O0 420
~NRA LDT 00 000
}PHI [.,DT Pb
'EF I,DT O0 35~
'CNb LOT OP~ O0 330
{NOR ~b;, OH~ O0 ~52
IlNV Mbt, OHMN O0 250
~A MbL IN O0 ~BO
~R ~6L ~API O0 310
01 0 0 4
02 0 0 4
01 0 0 4
O1 0 0 4
O0 0 0 4
O0 0 0 4
O1 0 0 4
31 0 0 4
30 0 0 4
n 0 0 0 4
O0 0 0 4
O1 0 0 4
Ol 0 0 4
)EPT
7038 5000 SFLU
-18:1.670 GR
-999.2500
6 6375 DRHO
53:7598 DEF
1.g91.3 MINV
)EPT
5P
gPHI
7000 ~000
-20 6670
2 4963 DRMO
~ 1057
47 7539 PEF
! 99~3
3EPT
H 0 B
HOB
gPHI
~NOR
bOO00000
-25 2607 ~ 3909
~ 3909 DRMO
30 3223 PEF
~p
RFIOB
RHOB
N 0 R
6~00 0000 SFLU
4}0570 ~R
'42 ~936 DR}{O
~209 DRN[3
29 0039 PEW
102416o ~v
DEPT
sp
NPHI
MINOR
6700 0000 SFI,U
-2~ 09~1 dR
2 39,~8 ~RlqO
~ 4'768 DRHO
28 7598 PEV
6 110! ~INV
DEPT
8,73 ~ 3 C R
2.6350 ILD
'~1~ 2227 nR
'99g:~500 GR
i 3331 ~RAT
6~59~5 ~!CgL
2.0608 I,,A
2.7i70 I,I,D
-1.14.2 27
0.0923 GR.
0.2734 NRAT
6.5945 NCNL
2.0608
11.3770 TLD
75 46,48 GR
0 0459 ~R
0 07,42 NR~T
2 9065 NCNI~
7 ~()93 I.,A
57 5117
511,~.,.9~2
CR
o., 23
O.
2.4553
8,6504
.9773 IbD
! ~R T
.:0967 NR,~.
2,4299 NCNL
7.3406
6.2507
91'8398
1 68 00000000000000
1 68 00000000000000
1 68 00000000000000
1 68 OOOO0000000000
1 68 00000000000000
1 68 00000000000000
1 ~8 O0000000000OO0
1 68 00000000000000
1 68 00000000000000
1 68 00000000000000
I 68 00000000000000
1 68 00000000000000
1 68 00000000000000
2.1799 IbM
-999.2500 CALl
-114.2227 CALl
3.7639 RNRA
-1~73.3125 FCNL
4.46~7 GR
2.42~0 ILM
96,02 3 CA[,I
"114.2227 CtLI
3.7639 RNRA
-1~73.31~5 FCNb
4.461.7 aR
6.6648 :I.I~
~,6523 CALl
.4648 CAI,,~I
2 7952 RNRA
2473~5000 FCN5
8.3301 GR
20.~43 I'b~
51. 30 CALl
. 1992
5~.6858 RNRA
3059,5000 FCN'b
~.4004 GR
7.1609
75 7773 CAI,ii
B3:8398 CALl
~,7034
2997.5000 FCN~
8,7988 GR
6,5281
88.3398
2 4456
-999 25O0
3 541.3
4 0867
-458 1,094
-i14.2227
2.5393
9,2285
8.68~5
4.0867
-458.1094
-114.2227
7,~062
9. 801
8.9082
2.9709
75,46
2~,0674
8.9082
.6348
~,9084,
,1992
7.3601
9 =0254
9 0488
2:163
1027 875
83 8398
6,8796
9.1270
,VP Oln.N02 VEPlF.iC~"ION bTSTING PAGE 5
'HOB ~,4.807 DR~O
'HO~ 2.5393
~EPT 6500.0000
;P -2Q 7451 ~R
IpHI 52i6855 PEF
~UOa 1. 3409 ~INV
)EPT 6400.0000 SFLU
~P -34.1758 ~R
IHOB 2 4163 DRHO
~HOB 2~3909 DRHO
lPHI 44 q219 PE?
)EPT 6200.0000 SFLU
~P 3~.17~8 ~R
~HDB -99 ,~500 DRHO
~HOB 2.5198 DRHO
~PHI 34,7656 PEF
~NOR 2.7502 ~INV
)EPT
~P
~HOB
~HflB
~NOR
)EPT
RHOB
~PMI
MNOR
OEPT
RHOB
NpH1
~NOR
6200 0000 SFbU
-45 33~0
-999 ~500 DRHO
-099 P500
-99~ ~500 PEF
. 2483 ~i~V
'7383 ~
99:~500 DRH. O
-999,~500 DRMO
-09~,~500 PEF
.V502 ~INV
6000 0000 SFI..,U
-46 2:605 ~R
-999 2500 DRHO
-999 2500 DRHO
-099 ~500 PEF
2 7502 ~IMV
5900.0000 SFLU
-49.2383 GR
-999,2500 DRHO
-999.2500 DRHO
-090 2500 PEF
3:7659 MINV
.0029 ~R
.0596 NRAT
4.0828 MCML
R.8691 LA
1.7061
!16,7148
0.0269 GR
0 0879
~:9202 NCNb
1,9678 LA
123. 48 OR
0,0254 GR
0,0400 MR~T
3.4807 NCNL
2.0920 LA
4 ~.335 IbD
201 1875 GR
-090 ~500 GR
0 1846 URAT
3 8674 WCNL
3,2913 LA
4 0476 ILD
-099, 500 gR
"999. 500 NRAT
-09~.,,,~500
3,1.467 LA
4 3757
~.23 3398
-990 2500
-099 2500 NR~T
-999 ~500
3 :~995 LA
5 1570
~.18 4648
-999 2500 GR
-999 2500
-999 ~500
~ 96~! LA
4,6218 IBD
94,~0~3 GR
~999,.,500 GR
-099,~500 MR.bT
-999.2500 NCNb
4.5398 LA
91.8398 CALl
2.8870 RNRA
2755.5000
0.0645 GR
1.5294 IL~
107,3398 CALl
116,7148 CALI
4.1179 RNRA
1858.6875 FCNb
9,6660 ~R
1.8956 IBM
~14.5273 CAbI
123.2148 CALI
3.6975 RNRA
1900,6875 FCNL
9,6660 GR
~,9241
-999.~500 CA[.,I
201.1875 CALl
3,~,233 RNRA
2209,$000 FCNb
9,46~9 GR
3 2073
-999 2500 CALI
138 1875 CA[,I
-999 2500 RNR,A
2~.49 5000 FCNb
1, O 46~9 GR
4,1335
-999,2500 CALI
123,3398 CAbI
;999,~500 RNRA
357,5000 FC~b
10,7988 GR
4 3250
-999:"2500 CALl
1'18,4648 CALI
-999.2500 RNRA
2~61'~000 FCNb
10,5332 GR
4,51~5
-999,~500
94.90~3 CAbI
-999.2500 RNRA
258~,5000 FCNL
9,4004 GR
9.2520
3 2542
846!~125
9~. 398
1.5880
9,7441
9,7363
4 2390
438:1406
~6,7i48
1 9522
917207
9 7754
4 1765
455,~406
123.2148
2,9944
-999.2500
9,~254
3. 199
600,3 2~
20.1,187
3 2581
-999 2500
10 7129
21
59]
4,2468
-999,2500
;7598
15,5002
673,3125
123,3398
0
1o 5020
3 58 ~
658 81,~
~18 46~
4 6843
-999 2500
9 7832
3 2600
791 3125
94 9023
,VP Oi~,HO~ VErIFICAtiON bTSTING PAG~ 6
,~pt 5~oo oooo sFt, u
~HOB -099.?500
IPNI -q99 2500
INOR ~:66R2 ~INV
)EDT 5700.n000 SFLU
;P -39.1445 GR
~HOB -99q,P500 DRHO
IHOB -q9q. PSO0 DR~O
IPHI -099.2500 PEF
~NOR 1.q776 MIMV
)EPT
;P
~HOB
~HOB
5600.0000
-41 3633
2 ~674
-999 ~SnO
-g9g 2500
2 68t9
SFLU
PEF
~INV
)EPT
~P
~HOB
~HOB
~PHI
qNOR
550O
2
36
0000
~.133
4026
4670
~6q9
0725
SFLU
GR
DR~O
DRHO
PEF
)EPT
~H~3B
~HOB
~PHI
~.NOR
540O 0000
4.6758
'4~,3401
-999.2500
,o99,~500
1. 639
~R
DRHO
PEF
5~00,0000
4513945
-99q,~500
2099,2500
999,~500
2.~.483
~R
DRHO
gPMI
~NOR
.1,445
-999.2500
-999 ~500
-99~ ~500
~ 0999
S F L U
DRHO
D R H 0
PEr
DEPT
SP
RHOB
NPHI
5100 0000
-47 33P0
-090 2500
-999 2500
-099 9500
PEF
4 0750
116!4648 GR
-q9O ~500 GR
-999.2500 ~!RAT
-~99.2500
?.9534 LA
2,1292 IbD
~06,6523 CR
-999,2500 GR
-ggg ~500 ~RAT
-~99:~500 NCNb
2,2756 LA
7569
4023
0464
~,182
~799
3479
TbD
NRAT
2 ~584
104:'4023
0,0059
-,~9~.2500 NR~T
-999.2500
2,3069 L.A
~.6155
87 ~64,8
-990 .500
-999 2500
'-g9g ~500
~ 6643
2 4436
76 7148
-999 2500
-999 P500
-999 2500
2 439'7
2 3674
86 409.,3
-999 250('.)
:o9o 500
999 ~50o
GR
NRAT
NCNL
I,A
~R
NRAT
NCNb
LA
! bD
~R
NRAT
NCNb
3,7659 IbM
-090.2500 CALl
116,4648 CALl
-999.2500 RNRA
2485,5000 FCNb
10,6660 ~R
2,1.995 IbM
'099,2500 CALl
106.65~3 CALI
-999.2500 RNRA
2573,5000 FCNL
9,46~9 GR
3.0042
121.3398 CALl
111.9648 CALI
'999,2500 RNRA
2567,5000 FCNL
9,6660
2.3127 IbM
~o~ 6~3 ca[~t
}11:4023 CA~i
3,2502 RNRA
2637 5000 FCNb
9~676 ~R
2,5120 IbM
87,8398 CALl
]04,4023 CAI, I
'999,2500 RNRA
2797,5000 FCNb
9,3,301 GR
2,6858
-999,2500 C.~LI
87,9648 C LI
-999 2500 RNRA
2737:5000 FCNG
9,5332 GR
2,3596 IbM
-999,~500 CALI
76,7148 CALl
-999,2500 RNRA
2577,5000 FC:Nb
9,4004 ~R
2,3479 IbM
-999,2500 CALI
86,4023 CA[,I
-999,2500 RNRA
2485,5000 FCNb
3,7659
-999,2500
10,7129
3.4084
728 8125
I16~4648
2 2483
-q9q 2500
9 7598
3 1624
813 3125
106,6523
3,1526
9,6973
9,7520
3,2268
795,3125
~.11,9648
2,3694
9 572
9 798~
3 4924
754 8125
1,11 40~3
2 5276
9 5176
9 5254
3 5100
796 ~125
1,04 023
2,71~0
-999,25 0
9,5879
816, ~5
87,96 8
2 8
oo
9 6426
]: 5 o o 2
736,3125
76,7148
2 4163
-999 ~500
9 7363
3 4436
721 3125
VP OIO,HO~ VERIFICATION LISTING PAGE 7
NOR 2.1252 MINV
,P -48:i258
HOB -999.~500
:HOB -~99.2500 DRHO
'PHI -q9g 9500 PEF
[NOR ~0588 ~I~V
,EDT 4~00 0000 SFbU
;P -50~4.570 GR
IHOB -999,~500 DR!~O
IHflB -999,~500 DRHO
;PHI -999,2500 DEF
INOR ~.,q9~3 M1NV
)EPT 4800 oOOO SFLU
I, HOB ~99.2500 DRHO
IHOB :990.2500 DRHO
lPMi -999 2500 PEF
)EPT 4!00 0000 SFhU
;P 51:1.445 GR
~HOB '- 999,2500 DRHO
~HOB :090.~500 DRHO
~PHI 990,2500 PEF
~NOR ~,~756 ~INV
)EPT 4600
3P -51
~HOB -999
~HOB -999
~PHi -990
4NOR
0000 SFLU
3633 GR
2500 DRHO
~00 DR,O
_ O0 PEF
9913 ~I~¥'
~EPT
:~H'OB
gPHI
4500 0000
-5:3 08~o
-999 2500
-~99 2500
-999 ~500
~ ~.8~9
SFLU
DR~O
PEF
9EPT
R H 0 B
gPHI
MNOR
4~00 0000
-999,2500
-~99,2500
-999,~500
~.3'303
D R H 0
DRHO
PEF
~' I H V
SP
4300.0000
-54,5195
-99~,~500
SFLU
DRHO
2.4299 t,A
~ 2131 ThO
82i7148 GR
-~99 2500 GR
99 2500 MRAT
:~99i2500 ~CNL
2 4182 LA
2.3303
85,2148 GR
-999,2500 GR
-999.2500
-99q,~500 NCNb
2.3577
2.2600 TbD
8~,1523 GR
-090.2500 ~R
-999.2500 NRAT
-999,2500 NCNb
2.4299 LA
2 6526
8O 5898
-999 2500
-999 ~500
-999 500
2 7053
I b.O
~,R AT
~C~,b
2 3284 lbo
86:8398 GR
-999 ~500 ~R
-999:250.0 NRAT
-999,~500 NCNb
~.3674 LA
2.6604
8
-99~ 250
-99 0
-999 2500
~ 55~0
2 7424
1(}~ 964:8
-999 2500
-999 2500
-999 2500
2 7170
~R
GR
NRAT
bA
ILO
GR
GR
uR,~T
NCNL
bA
2,715i
86,P148
-999,2500 GR
9.5957
2.2'137
'q9q.2500
82.7148
-999.2500
2583.5000
q.79~8
2.2756
-999.2500
85,2148
-999.2500
2385,5000
9.5957
2.3538
-999.2500
88.15~3
-999.2500
2421.5000
9,7988
2,5803
'999.2500
80.5898
999,2500
as.5ooo
9,7988
-999,25,.0
500
2473,5000
9.7285
2.0303
-999.2500
. 96.~398
999,2500
2307,5000
10,0020
2.6819
-999.2500
~.02,964~
-999,~50
2213,5000
10.0645
3.1780
-999,~500
86.2148
GR
CAbI
CALl
RNRA
PCNL
CALl
CALI
FCNb
GR
IbM
CAbI
CALI
RNRA
FCNL
GR
CALl
CALI
RNRA
CALI
RN~A
FCNb
GR
CALl
CALl
RNRA
FCMb
CALI
CAbI
RNRA
! [,, r,1
CALl
C A L I
86.4023
2 3030
-999:2500
9 ~926
679,3125
82,7148
2.3088
-999.2500
9.7520
.3 27~7
85,2148
2,3772
'999.2500
9,8613
3,3557
721,3125
88.1523
2.5920
~999,2500
9.9160
3,7698
645,8125
80,5898
2 ~924
'999 .500
9 066
4 835
564 125
86 8398
2,8557
'999,2500
1~.0801
697,31~5
96.8398
2,6741
-999,2500
!~,0645
'5393
625,3125
t, 02~'9648
3, .,12370
-999, 500
9,6660
,VP Oln.HO~ VERIF'IC~"ION bYSmlNG PAGE 8
~HOB
IP~I
INOR
)EPT
;P
tHOL~
)PHI
~NOR
;P
4NOR
)EPT
tHOB
4NOR
3EPT
~HOB
~HOB
gPHI
~NOR
D£PT
SP
RHOB
NP.HI
N~NOR
OBPT
SP
RHOB
NPHI
~NOR
DEpT
RHOB
PHI
NO R
DEPT
-99q 250() DRHO
-q9q: 250() PEF
2.5198 MINV
-ggg 2500 ~,~R AT
-99g: 2500
3,3010
4~00.0000 SFI, U
57.08~0 GR
-g99.~500 DRHO
-~99.2500 DRHO
-Q99.~500 PEF
2.8967 ILO
1077773 GR
:990!~500 ~R
999 2500 ~.'RAT
-n99.2500 ~CNL
~,7366 ~,A
4100,0000 SF[,U
-5¢.~508 GR
-999.2500 ORMO
-990.~500 ORHO
-99~ 2500 PEF
~4124 ~INV'
4,41~7 ILO
102.~773
2500 GR
. g:25oo
-090.2500 ~'CNL
4,0281 LA
4200i0000630508 C..RSFLU
2 ~()30 ORHO
-999 2500 DRHO
-999i2500 PEF
,9,, 7229 ~,INV
3.5401
120.1523 GR
0 0107 ~R
-990~5oo ~'~R~.T
-99~,~500 NCNL
'.1272
3900
-63
-099
-999
-099
0000 SFLU
2500 OR~O
25n0 ORHO
~500 PEF
1..135 MINV
2 ~327
1.03 9273
-999 ~500
-999 2500
-090 2500
2'6643
~ 0000
3 00.
66.2852
-999.~500
-9992500
-990'2500
3~2913
SFLU
DRMO
DRHO
~INV'
~R
GR
N'RAT
NCNb
3700
-66 2227
-9902500
-999 2500
-999 2500
3.3167
~INV
4,.3835 ILO
~.()4.7773 GR
-9992500 ~R
-999:2500 NRAT
-999.2500 NCNL
3.7307 LA
4929
,~,523 GR
2500 GR
2500 NRAT
,2500
5881
3600 0000
-277607
-9992500
-9992500
2500
-99~ 7229
SFLU
ORHO
DRHO
PEF
~INV
4
108
-999
-999
-999
273
2500 G'R
2500
500 NCnb
.~057 ~.,,~
3500. 0000 8FI,,U
3
~.12
-999
-999
-999
3
3.7795 !LD
-999.2500
2323.5000
9.1.348
3.1487
-999.25O0
107.7773
-999,2500
2351.5000
9,5332
4,6257
-0992500
!02~2773
-999.2500
2473,5000
9,267~
~.7249
!1~.,402~
120,1523
-999 2500
2.1.41:5000
1.0,5332
2,9670
-999,2
999.2500
2207,5000
10,1348
4,6296
-999.2500
104,7773
~999,2500
2273,5000
10,1348
4,7781
-,999.2500
08,1..523
-~99,2500
2293,5000
10.7988
3.§069
-999,2500
1'12,,0273
-999,2500
2~97.500~
1.0,595
RNRA
FCNL
Ib~
CALl
CAI, I
RNRA
FCNL
GR
IbM
CALI
CALl
RNRA
FCNL
GR
CALI
C~5I
RNRA
CALI
CALl
RNRA
~R
CAI.,I
CALl
RNRA
FCNL
CALl
CALI
RNRA
FCNL
GR
CALl
CASI
RNRA
~ONL
~R
3.3303
697 3125
3,1038
-99~.2500
95879
745 3125
4,5320
-999 2500
9!4551
4 0828
605.8125
102.2773
3.6877
10,43~6
10 6191
3~2249
,1523
2 9084
-999 2500
' 1.0 29].,0
3 9104
564 3125
103,0273
4,5359
-999 2500
10'
:
1.04,
4,~312
10,7
~.1620
609' 125
J08,1523
11 00~0
4
11~
3,7542
VP OIO,H0~ VEriFICATION LISTi)~G PAGE 9
P -29 5107 GR
H~O 2:2678 DRHO
'HOB ?.7288 ~RF~O
!PHI 40,3809 PEF
INnR 3.0608 ~INV
108,4023
0,0205
0,0088
3,!702
3,a534
~R
GR
LA
,EPT 3400.0000 SFLU
;P -30.2007
4.0750
93.0273
0 0054
S
0,0488
2,9456
5.25O7
IbD
MRAT
~CNL
)EPT 3~00i0000 SFI,U
;P 35 08~3 GR
IH~B 2 ~.975 ORHO
[HOB ~,2385 DRHO
{PHI 4~ 0645 PEF
INOR 411.453 ~INV
5,7859
80 33qB
,
0,0112
0.0835
3,02~5
4.735J.
)EPT 3200
;P -47
~HOB ~
{PHI 35
0000 SFLU
9570 GR
1467 DRHO
1.643 DRHU
79]0 PE?
0160 ~{INV
18 0986
9O 0898
-0 00~4
0 '0532
2 3206
5,8015
NRAT
LA
)EPT 3116.
}HOB -o99
~PMI 59
0000 SFLU
6934
~500 DRHO
1995
8555
0000
6 7976
52 1992
~999 2500
-0 3936
31 3709
0.0000
GR
~RAT
~, FILE TRAIt, ER **
FILE 5t~NM :EDIT .001
SERVICE NA~E :
~fERSIOM ~ :
MAXIMI.J~ LEMGTH : 1024
FILE TYPE :
~EXT F'![.,,~ NAME :
** TAPM TRAILER
SERVICE NA~E
DATE :85/06/29
ORIG~.N :FS1A
TAPE NAM~ :
CONTIN!IATION ~
NE×T TAPE NAME
**
:01,
:
10t,4648
108.4023
3.5275
2~53.5000
10.5332
4.3093
80,7148
93.0273
3,5354
2167.5000
9.9316
6,516q
78.1523
80.3398
3,5178
2269,5000
10,1348
14,8613
88.96~8
8089~, 5~1
2349,5000
10,5332
7,5515
-999,2500
52 9
1375,6 75
9,1348
CALI
CALl
RNRA
FCNL
GR
TLM
CALl
CALI
FCNb
CALI
CALl
RN~A
FCNL
~R
IbM
CALl
CALl
RNRA
ILM
CALl
CALl
RNRA
FCNb
~R
10 ~926
10! 754
t 5569
605 31~5
1.08,4023
4,2585
10,3223
9,9941
3.8323
5653125
93~0273
6 2312
10 1895
10 1660
] 5940
6tl 3125
80,3398
15,2363
10.4082
1~,50~0
..,6292
647,3125
90,0898
~000 6875
999 2500
9 29~8
4 2703
322 1406
52 1992
iVP 01~.,~q02 VE~iPIOA'PION LISTING PAGE 10
IOMMRN~$ :LIRRARY ~ADK
:* REE;, TRait, ER **
;E~VTCM NA~E :EDIT
~ATE :85/06/79
~RIGIN :
!EEL NAME :135037
~ONTTNUATION ~
!EXT REE~., ~AWE :
~OMMENTS :LIBRARY TAPE
*****$**** EOB'
EOF