Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
HOME
EVENTS
DATA
Data List
Drilling
Production
Orders
Data Miner
Document Search
REPORTS
Reports and Charts
Pool Statistics
FORMS
LINKS
Links
Test Notification
Data Requests
Regulations
Industry Guidance Bulletins
How to Apply
ABOUT US
History
Staff
HELP
Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
161-027
lc-apfm lOJan95 LOCATION CLEARANCE REPORT State of Alaska OIL AND GAS CONSERVATION COMMISSION Memorandum To File: APl No. dkD~- /'OC~I'S 'OO ~nd Date spud: ,, Completed Note casing size, wt, depth, cmt vol, & procedure. Liner: Review the well file, and comment on plugging, well head status, and location clearance - provide loc. clear, code. , , ,, ? Well head cut off= . Marker post or plate: , / / Conclusions Code MEMORANDUM TO: THRU: State of Alaska Alaska Oil and Gas Conservation Commission 'David John~ Chairmecr~ Blair Wondzell, P. I. Supervisor FROM: John Spauldin , :' SUBJECT: Petroleum Insp ,~l!~l DATE: October 23,1994 FILE NO: ROSETTA. doc Inspection of Rosetta Wells Vicinity of Houston Ak... ',~ Friday, October 23,1994: I traveled by POV from my residence to the area near Houston Ak. to inspect the 5 Rosetta well locations for leaks of oil, gas and water. Due to the new growth of brush and quite tall grass I was able to Iocate'~'" of the 5 wells, ( wells 2,3,4,&4A. Rosetta #2: The 10 1/2" casing extends about 12' above ground level and has a flange welded to the top with a steel plate bolted to the top. There are two side outlets, one near the flange ( 2" ) and one about 4' from the flange ( I 1/2" ). The 2" side outlet appears to be plugged. The 1 112" outlet is open and does not appear to have any hydrocarbons or water escaping from it. Water is bubbling up around the casing and is flowing down the highway cut toward the highway; due to the sandy nature of the soil, the water is flowing a distance of 10 to 15 feet before disappearing. I dropped a rock into the 1 1/2" side outlet and was able to detect fluid at or very near the surface. The water coming from around the casing does not appear to have any hydrocarbons in it, although a slight smell of gas can be detected. ! recommend that the State of AK. consider a proper abandonment of Rosetta well #2 in the near future. Rosetta 03: There is a 6 112" marker post welded to the casing head extending 5 1/2" above ground level. The marker is properly marked with the well name, section, township, "range and meridian. The well marker is located in the middle of the MEA power line rieht of way constitutin.a a personal hazard as these ROVV's are quite often used by ATV's durine the summer months & snowmachines in the winter months. There is a rusted area where the marker post is welded to the casing head; it does not show any leakage of any type. The location is cluttered with old rig junk and an abandoned camper. The location is growing over with alders and small birch covering up much of the existing rig junk. Rosetta fi4: A properly marked 4" capped steel pipe is welded to the 6" casing head. As noted in a previous report dated 10125/71tthe 1 112", valve located on the 6" casing was found to be operative. I found this valve to be in the open position and was unable to close it. There did not appear to be any hydrocarbons escaping from this valve or the several bullet holes in the 4" marker post. The area in and around the cellar box has some water seepage that appears to be somewhat salty. Rosetta #4A: Located approximately 75' from Rosetta #4, has a properly marked 4" capped Steel pipe, with well name, section, township, range and meridian. No leaks were found in the area immediately adjacent to the casing head. the marker post has bullet holes in it with no apparent leakage. As noted in the 10/15/71 r. eport at that time, parts of a rig were scattered around both Rosetta 4 and 4A, all junk has been removed and everything looks to be in excellent shape. R0setta #!: I was unable to locate this well or the diamond core hole located next to Rosetta #1. The area has grown over with quite dense vegetation and the well has no known marker post. This well is of some concern, as the 10/15/71 report indicates there was some leakage arond the casing of the well and also from the 3" diamond core hole. I will return in the spring prior to the grass getting as tall and try locate and inspect the wells in question. Summary and Recommendations: I inspected Rosetta wells 2,3,4&4A and found all to be in fair condition with the exception of Rosetta 2 as noted above. I recommend that Rosetta 2 be considered for surface abandonment, # 3 be cut off below ground level and minor work tha~ should be done to the other two Wells. Property ownership will need to be determined. FORM NO 9-1904 A; _ SITE NO U.5 DERT. OF THE INTERIOR GEOLOGICAL SURVEY �- WATER RESOURCES DIVI51ON D 1 A. r GROUND WATER SITE INVENTORY SITE SCHEDULE C'heCk ()nr --._ Errpinn __ Metric Unni GENERAL SITE DATA h:; .c MNFR DENTIFICAYIQN M MmL'E 1ss-I xI orHus •I ie Of.JTir C,AV40N NJMHLRs n1 I 'E�� � �I 'r. _. F, •:, � �- 1 ry I I I , .�+ '_ _ u 'N eesoX,eRCT i'' i�f' ray e1191/'� 'vis. _.. r 1J_. �jI f_.1 SITE VISIT DATA 111 Nan W 1ven, r i I 1 r. MLO VlATFR QUALITY MCASUREMINI', 11 ♦Ja n.rx.e. m.mdr ,. ai/r T: R In 19 lY5 - Der�rees C u Mhos1gETTL 1 t _. Value 191 .. ` valee Zvi •. _• I'I FOOT NOT=S souse of Wu, coder. L SD O A R .x ¢rrrN __.-_ '_� , J'm _. _Y-... L. r.lo f11 ��5 r � 1 o ara 2 ' - 9t�,I�I�IsTot r"•� IJ �j rAl sae I lU1J�S1 1 I� n% P14�L' 1/ IN N—b, L-121�l"'E L� l I L�r-1� - Lo, ' ct1 ron-x 1N Ln V4 iAINL�-1 a: (,F1 In 113 E fi :f .l ��_C .l , _— - x� 16 II,1]; I Melo tlol - tT1 A M rI I r r Ahnude r I -J ._ M enual LST , nRo I 19- P C E T H H L fl R 5 i R arDlRale 4V U V '+ (DCI o -� a.Flee, no diwFl. "xsa y, of Ccnsrm n( 21 1 L23 E t n M ll N 9 U r.o. u„ ..r .r ,a..e ,. :r ,�, ,. r..m.e rr•o oa,o r:en a.r..ov a ,L.,•�: ra.xr. .r�..., ,. n .w UFe OI A 3---- C Lnf'.-q _ ____ D G F If I M e, u.n fa V 8 S II V rlesnl I � ear vrr enJ.. ru u 5. nam _ lI rY Vle � w 'A 25 -.I_� ounnln ,c .ve. ,re, r'q,1 v'.. neU"env I.,M'jI P R nf� 21 _iI -t ei � �._•_. ne ra'r n.. 1u I . lk9ih f 1 St:w'e r1F1 1P � � y�y 1 . \ . •r lar ..1 Yater . 1JJ Hole L 1 _ _l L_ AM� ... J... D.I,In 01 L36 r Wnur T1 Rieam r I , '�.. Smrt 1r3S +: te.el I .�*� tlnm .4 I. I G E C M M R S T V 1 - MnhM .Flrvm:aam X34 A _ a. unlrrre yoga ,ssura los 1w 'KVr 3 1r 1. .• r ry a ro r. al.rr rr rnr.e j ..0 31 .I.D F G........ ll N V if S T-- V s T- •-�- Sue Suu s ... uJ,¢ flowiry r . P'r'Y,xJ Fl: rnrrq nf1Y Xganrr r(Ixr.ry ,�_ j Ilo viny OurnrrW 36 I".� 6�oY ' aria 1' �r, MPinfy 266IDat" M ng IF/= X Ytlroln9e Da�1 FunrPl a IS 11- MNFR DENTIFICAYIQN M MmL'E 1ss-I xI orHus •I ie Of.JTir C,AV40N NJMHLRs n1 I 'E�� � �I 'r. _. F, •:, � �- 1 ry I I I , .�+ '_ _ u 'N eesoX,eRCT i'' i�f' ray e1191/'� 'vis. _.. r 1J_. �jI f_.1 SITE VISIT DATA 111 Nan W 1ven, r i I 1 r. MLO VlATFR QUALITY MCASUREMINI', 11 ♦Ja n.rx.e. m.mdr ,. ai/r T: R In 19 lY5 - Der�rees C u Mhos1gETTL 1 t _. Value 191 .. ` valee Zvi •. _• I'I FOOT NOT=S souse of Wu, coder. L SD O A R .x ¢rrrN FORMNO. O~-iB .~,,~ MEMORANDUM TO: j-- O. K. Gilbreth, Jr. Chief Petroleum Engineer State of Alaska DEPARTMENT OF NATURAL RESOURCES DIVISION OF OIL ~ GAS DATE : October 15, 1971 Inspection of Rose~a Wells & Vicinity Near Houston. FROM: Karl L. VonderAhe Petroleum Engineer /" L.--~/7 Left the office October 14 at 9:20 A. M. and drove, with Don Blasko, U.S.B.M. Engineer, in a Federal car, to Houston, arriving there at 10:45 A. M. We visited the location of all five Rosetta wells and checked them for leaks ~ of gas, oil and water. ~/ o~Rosetta t/1 has no marker. The casinghead is in the remains of a cellar with ~~~~4~ b~a!i!eiini~!°t~tTwhe~°d!iPto!fet!!!t~ash!!~t!ie . there is a leak in the casing a few inches below the surface from which a very small amount of gas is bubbling. We took a liter sample of the gas by water displacement. There also appears to be a very slight seepage of water which is very salty. Also caught a sample of this water. Either the water seepage is very, very slight or it is seeping away into the surrounding formation, as so little is present it was difficult to get even a liter sample. Alongside, to the South toward the railroad, is a sump of about 15' X 60' which is standing nearly full of water. About 90 feet SE of Rosetta 111 a 3" pipe protrudes 7" ab ove ground and from this is flowing a stream of water with considerable gas bubbling up through it. The water flow was measured and found to be one gallon a minute, or 34 barrels per day. The water is slightly brackish. 'A liter sample of the gas was caught by water displacement and a gallon sample of the water was taken. Don Blasko is sending the gas for analysis and the water for salinity determination. At present we have no way of identifying this well, but it is known that Tucker and Peterson requested the Bureau of Mines to leave their diamond core hole I/2 unplugged for their use. Because of the size of the pipe from which the water is flowing it would indicate a diamond core hole rather than a rotary-drilled hole for oil exploration. Tucker & Peterson may have wanted it left open for a water supply for their drilling rigs. While brackish, the water could be used for drilling mud and cooling water for engines. ~This possibility should be explored to identify the well and the responsible party. Considering it is only a 3" pipe and is flowing water, the latter seems more likely. There~is no showing of oil in'this water or adjoining the surface stream from it. There is a great deal of iron oxide below as the stream flows through a lot of discarded thread protectors, collars and barrels. The stream flows for about 60 feet ~_~ from the highway and toward the railroad; here it seeps into the ground so that beyond this point down to the base of the railroad fill there is no water visible on the surface. The water is not salty enough to show any effect upon the vegetation. O. K. Gilbreth, Jr. -2- Oct:obeY:' · 1'5,", 1971 About: 36 feet: SE and 54 feet NE from this 'k~ater well" is a 10-1/2" casing protruding. 3-1/2 feet above .a__concrete block.. It: .has...a..flange ,welded on .top - and a steel plate bolted t:o the flange. There is a 1-1/2" pipe st:ub welded into the casing near it:s base. This pipe stub is open and a pebble thrown int:o it can be heard rat:t:ling down t:he casing showing that: there is no fluid near the surface. The protruding casing is serving as a marker, as t:he well name "Roset:ta #2" and the 1/4 - 1/4 section, township and range are bead welded on it. At: this t:ime there is no water seepage showing on the highway cut face or in the dit:ch; all wet:er showing on the surface is flowing away from t:he highway and toward the railroad. As the highway cut is through a mixture of sand and gravel it: is possible that with winter temperatures the water from the "water well" may freeze on the surface t:o the point where the water may be diverted' in the other direction and seep through the gravels to the highway. It is also possible that a subsurface leak in either Rosette #1 or ~/2 from which water may now be seeping toward the railroad could be the cause of water going the other way through t:he gravels when it gets cold enough to freeze and seal the seepage, which may now be moving southwestward, and reverse the direction of flow. However., we were unable to find evidence of any fluid reaching the surface away from either of these wells. Any oil found in the vicinity of the railroad must: have come from spills originated by the railroad. Blasko dug a small depression next t:o the wellhead' in t:he cellar of Roset:ta f/1 and while waiting .for the wet:er t:o clear t:o get: a sample of it: we drove into Willow for lunch.-and to get: some matches to test t:he gas for flammability. Upon returning we checked the gas coming from the "water well" and found it would sust:ain a flame for a few seconds -- probably met:bane. We then drove to Roset:t:a [/3 which has a 6-1/2" pipe marker welded to the casing- head and extending 5-1/2 feet above ground level. The marker is properly marked wit:h the well name and the"l/4 - 1/4 section, township and range. At the top of t:he'-collar'.'to:iwhich- the 6-1/2" pip'e~iS...welded, the collar or weld has rusted t:hr°ugh' and- a 'white ,'. salty C°ating/~Shows there has been a small fluid leak at some time,, althoUgh there. 'is 'no evtdence!:~..of'~ any recently. The location is cluttered wit:h: Parts' of the derrick,' the sub-structure and other pieces of equipment:. This well is on the top of a ridge and is about 150' NE of t:he highway. t:he location of welded int:o the t:op of the 6"'-.casinghead and 'extends about six feet above the ground surface. A valve on a 1-1/2 st:ub welded into the 6" casing is still operative.- When opened it: showed no fluid nor any gas pressure. Roset:t:a [/6-A is about: 75 feet: SW of [16. It: has the Jackknife derrick and subst:ruct:ure st:iii st:anding over it:. The draw-works are st:l. ll in place on There is a Wilson-Snyder pump setting on the ground at the rear The ~raveling block is laid down on the floor, bu£ the cable is , ~'~/ the floor. _~ ,~%°~oof ,he rig. O. K. Gtlbreth, Jr. -3- October.; 15~,, 19~71 · .. still in place through the sheaves of the block and crown. The stand pipe with rotary hose still connected is standing on the edge of the floor and tied at the top with only a piece of hemp rope. The kelly joint is on the ground by the side of the road. Much junk and pieces of equipment are scattered around the location. There is a 9-5/8" casing collar exposed at ground level with a 6" marker welded into it and extending 5-1/2 feet above the surface. No connections on either the marker or the 9-5/8" casing. There is no leak of any kind apparent from this well. We returned to the office at 3:45 P. M. ~. H&ckar. horn~ Drt. l.:~t.n$ 13o. Rosetta No. 4-A Permit No. 27-61 Issued: 7-3-61 Loc: 1876' FNL & 486' F~L Seco 21, T18N-R3W, SB&M Elev: 32 6 ' Grd. Contr: Company rig Spud: 7-12'61 Comp. P&A 9-24-62 ToDo 2407' Csg: 8 5/8" C-406' w/175 sx 5 1/2" C'2392' w/450 sx Plugs :2180'-1930' 35 ' -Surf. Perf: 1990'; 2068'-73'; 2105' squeezed w/cmt. 2226'-2230'~ squeezed w/cmt. 2180'-2184'~ squeezed w/cmt. Forst 9-683 (Apriiisfa) UNITED STATES Sec. 21 DEPARTMENT OF THE INTERIOR ---- ---- ---- T. 18 N _ GEOLOGICAL SURVEY -- ---'--- - --'- CONSERVATION DIVISION R. 3 W INDIVIDUAL WELL RECORD Seward - -------------. Mer. PUBLIC LAND: DateNoirr-3Q, 1964_ Ref. No. --T—_� Land office _ Aush2aSe State Serial No. --U93.32______ ___ ____ 64W _MRta Lessee _Aneharage Gai; & ni LDav ,Ca . held_.. H— s ton n re s Operator Hackathorn Drlg. Co. Eaftm Alaska _Region Retested by Anchorage Gas & Oil Dev. Co. Well No. Rosetta #4-A _ Subdivision Location ______1876-' from North and 486' from West lines of section1__-_ Drilling approved —july 5 , 1911- Well elevation. __-_._.a96' K'R _ feet Drilling commenced _ Ju 1Y12 _------ 19-6 _ Total depth —.— 2407 — feet Drilling ceased September 3 _, 191 Retesting ceased:September 24, 1962 A)=jslt ti>q�>< B9p � . _ Z4 , 19-62- Abandonment approved --Kay.- .3, 19A4 - Geologic Formations Initial production Nnna _ Gravity A. P. I. Initial R. P. PnAnctive Horizons Surface Lowest tested Name .Depths Tertiary Tertisry None WELL STATUS Contents YEAR JAN. FEB. MAR. Ars. MAY JvNR JULY Am. SUPT. OCT. Nov. DEC. 1961 Dr 1g_ DrlL _ Dr1g, TRq- Susp Susp- 1962 Susp Susp _ _Susp -Susi- -Susp Susp _ Suso P&A REXARgs _Hackathorn drilled well to 2407' . Sgt 8 5(8"-csg-x_ 06 -tx_S "__cag @ 2392'. Perforated -tested & s_,g_ueezed several zones all showed_ traces of__gas ` with f lowi ig salt water. Anchors a Gas & oil re-entered in Se t 1962 Drld �,. ----���Luuggs..and__reteaiesi__z+rJaama__rea�llxs-�----���d_�d_igb�ndoned_Sept,_ 2411962. A 1_pp rforated intervals from 2235' to 1990 squee-zedoff with _cement, top of ----------------------------------------------------- cement1930' _ 5 sx plug_ fn_ top-af casingmoneament- erected..____._____ r u. s. aorcR*rim rRiNnNa wrrc: ib -58067-4 COMPLETION SHEET (over) 2065 - 2165 Sand w/porosity and permeability & w/yellow fluorescence from 2155' to 2165' 2229 - 2340 Sand w/porosity and permeability and w/occasional fluorescence. 2340 - 2407 Conglom., sand, and Graywacke Some granite wash. Occasional fluorescence. Form 9-091 ANCHORAGE 'ED {bray 1982) Uf STATES SUBMIT IN TRIT l,Tne Instructior, Form approved. Budget mean No. DEPARTMENT OF THE INTERIOR (Otter i re- tierce side 42-R1424 5. LEASE DR$IONW". AN1 SERIAL NO, GlEOLOG[CAL SURVEY —AnchoraFte 019332 SUNDRY NOTICES AND REPORTS ON ] L e. Is INDIAN, ALLOITH>fl Qg Tg=8C NA3rE (Do not use this form f�WI A"TiaoN FOR PERM T for nleuhgpro P fn 4.AG-AZ2M..T 1. OIL QA11 "U � �y WELL WELL ii OTHER Dry Hole �/ I} /��a� N V 2.9 IOU NAAIE 2. N►YE O8 OPERATOR _ 8. FARM OR LEASE NAME Anchorage Gas & Oil Development-, Inc.,A q� (ZYns"1 tf6 Rosetta S. ADDRESS OF OPERATOR Aj ICAL SU 12 lO' _ 134 East Socond Avenue, Anchorage, Alaska Al t 9. LOCSee B ON pa' WELL (Report location clearly and In�accordance with Rny state See also mace 17 below.) requiremeats.• _ 10. FIELD AND POOL, OR WILDCAT At surface Wildcat 1876 feet from North and 486 feet from Went lines of 11. sac., T., R, ll., of HLF:. A" Section 21. AURVEiIOR AREA See. T. 18 N., R. 3 W., SM 14. PERMIT NO. IL BLPFATIONS (Show whether DF, RT. OR, etc,) 12 H . COUNTT on PAR'S18. STATE f RB 326 feet Houston area I Alaska 1s. Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data NOTICE OF INTENTION TO: BURSEQUENT REPORT OF: TEST WATER BRUT -OFF PULL OR ALTER CASING WATER SHUT-OFF REPAIamo WELL FRACTURE TREAT ]IULTIPLE COMPLETE FRACTURE TREATMENT ALTERING CASINO SHOOT OR ACIDIZn ABANDON* SHOOTWO OR ACIDIZINO A1IA-VD0XMI3NT* xx REPAIR WELL CIIAYOE PLANS (Other) (Other)OTC: Report results of multiple Completion on Well Completion or Recompletlon Report and Log form.) 17. DESCRIBE PROPOSED OR COa1PLETED OPERATIONS (Clearly state a!1 inent details. and give pertinent dates, including estimated date of starting any proposed work. If well is directionally drilled. Rive pert subntrtace locations and measured and true vertical depths for all markers and zones perti. nent to this Work.) • Well Data TD of 2407' reached on 9-3-61 406' of 8 5/8f1 casing cemented with 175 tax cement, 2392 feet of 5h" casing cemented with 45D au cement. See back of this sheet for perforating, squeezing and plugging details. Well abandoned because of lack of commercial production on September 24, 1962. Final cleanup except for removal of rig completed in summer 1964. Permission obtained from homestead entryman to leave derrick in place. Inspected by Regional Supervisor, October 1964. (This space for Federal or ase) TITLFS President sA� �Ztll APPROVED TITLETlegionsl Oil & Gas Supervisor DA" WON Z 3 1964 B CONDITIONS OF APPROVAL, IF . *See Instructions on Reverse Side n e S 7 Perforating,_Sgueezing and Plugging Details Perforated casing with two holes per foot as follows: 2225' to 22351, 2174' to 21941, 2153' to 21631, 2105'(WSO) 1990'(WSO) and 2068' to 2073', tested for production. Squeezed off perforations with 35 ox of cement at 1500 psi pump pressure. Top of cement @19751, placed 10 sx plug in top of casing and suspended well on October 7, 1961. September 13, through September 24, 1962 drilled out cement to 2274', ran logs, perforated 2266' to 2230' with two jet shots per foot, tested for production, dqueezed off with 20 sx of cement at 600 psi pump pressure. Perforated 2180' to 2184' with two jet shots per foot, tested, squeezed 13 sx of cement into perforations at 1000 psi pump pressure, and left 22 sx of cement in casing with top of cement at 1930'. Closed in casing and waited on cement 24 hours. Placed five sx of cement in top of casing. Operation complete September 24, 1962. ^' C bl t! u FI _ i.. r = _ Ji Er �-4 a_= auco C w v O L— G i+ .:a O—�'•'G C N wU�:� O�— C A w j U YGr J U.:r O C��'L rte•= h -- L f,.. M aid tic, iU. G M .C. V' � •' — CC3 ,�. .1A -AUC! YA vi :J V% � n e S 7 Perforating,_Sgueezing and Plugging Details Perforated casing with two holes per foot as follows: 2225' to 22351, 2174' to 21941, 2153' to 21631, 2105'(WSO) 1990'(WSO) and 2068' to 2073', tested for production. Squeezed off perforations with 35 ox of cement at 1500 psi pump pressure. Top of cement @19751, placed 10 sx plug in top of casing and suspended well on October 7, 1961. September 13, through September 24, 1962 drilled out cement to 2274', ran logs, perforated 2266' to 2230' with two jet shots per foot, tested for production, dqueezed off with 20 sx of cement at 600 psi pump pressure. Perforated 2180' to 2184' with two jet shots per foot, tested, squeezed 13 sx of cement into perforations at 1000 psi pump pressure, and left 22 sx of cement in casing with top of cement at 1930'. Closed in casing and waited on cement 24 hours. Placed five sx of cement in top of casing. Operation complete September 24, 1962. Anchorage, Alaska Box 259 October 14, 1963 Anchorage Gas and Oil Development, Inc. 134 East Second Ave. Anchorage, Alaska Attention: Mr. George H. Tucker, President Subjects Your October 7, 1963 letter re: Rosetta Wells 3 and 4A Gentlement Reference is made to your request to delay the removal of derricks and other drilling equipment from subject wall locations. We are aware of your probless concerning adverse wenthar conditions and the scarcity of skilled rig builders in the area. Iio-yrever, we call your attention to th_ terms of your lease Anchorage 019332 and specifically to Section 6, a copy of which is attached. In view of the above, you are hereby granted 90 days after April 1, 1964 to comply with said lease terms and any other applicable regulations. Since Rosetta Number 3 location is adjacent to a public road, wa re- quast you mediately remove all debris and readily moveably material, which might cause injury to trespassers; and level location including pits. Sincerely yours, {QG ig. Std. M. H. S•:�'(5 i ER M. II. Soystcr Oil and Gas Supervisor Alaska Re -ion Attachmont WC'Junnicke:lnlSoyster: dmc:10/14/63 Copy to: Rosetta s 3 well file --*'Rosetta # 4A well file zrAmmmo .omm Pm 64 Oce Memorandum UNITED STATES GOVERNMENT TO -Files DATE: October 4, 1963 FROM :W. C. Wunnicke sUajEcr:Field Inspection of abandonment and location clean up of Anchorage Gas and Oil Development Company's Rosetta No's. 3, 4, and 4A. Lease No. A-019,332. The subject well locations were inspected October 3, 1963 by Messrs. Soyster and Wunnicke. A satisfactory monument had been installed on Rosetta #3. The 120?+ Standard derrick with some of the drilling equipment was still in place over the hole. .The mud pump had'been disconnected and moved a few feet off location. The reserve pit had not been covered and there is considerable debris scattered around the location. A satisfactory monument has been installed on Well'#4, and the cellar had been filled. Rosetta #4A is located about 75 feet from Rosetta #4. A satisfactory monument had been installed on Rosetta #4A. The jack knife derrick, engines, draw works, mud pump and engine were still in place over the abandoned hole. A considerable amount of leveling and clean up remains to be done. Mr, and Mrs. (Ruby) Manion, caretakers near the �Rosetta #1 well informed us that Hr.• Geo. Tucker has recently been in the process of cleaning up the subject locations. As a matter of information - A standard drilling derrick is in place over the abandoned well, Rosetta #1 located on a fee land lease. At this well most of the draw works and other machinery has been removed and there were 15 joints of 7" 23# N-80 casing at No. 1 location. W. C. Wunnicke RALPH D. PETERSON VICE-PRESIDENT AND DIRECTOR GEORGE H. BYER DIRECTOR GEORGE H. TUCKER PRESIDENT AND DIRECT. OR ROSETTA A. TUCKER SECRETARY-TREABURER AND DIRECTOR WM. K. FIELD DI RECTOR AN ALASKAN CORPORATION~m INCORPORATED MARCH- 1954 134 EAST SECOND AVENUE ANCHORAGE, ALASKA State of Alaska Division of Mines and Minerals 329 Second Ave, Anchorage. BROADWAY 4-9521 BROADWAY 4.1281 ~~~ May 15, 1963 Gentlemen: This letter is your authorization to release the samples and any other information you may have of record regarding our ~osetta No 4A well, 'to Standard Oil Company of California, for their inspection. Thanking you for your courtesy, we are GHT / rt Very Truly Yours Xncho= ge 9raD > George/H. Tucker, Pres. File November 15, 1962 M. H. Soyster Field inspection of well sites in the Houston Area On November 14, Messrs. Soyster and Reitz visited Anchorage Gas and Oil Company's walls, as follows: Rosetta 04 and d 4A (A _419332) Drilling rig is standing over well 4A. Mr. Folta was advised to burn the lumber and remove oil drums and wire line from the location. Posetta #3 A-019332) The following was rdported by the Company.: On November 13, at 8:30 P.M., the well was shut in for pressure build-up. On Vovember 14, at 7:00 A.M., the pressure in the annulus between the casing and the tubing was 62 psig. At 10:00 A.M., 74 psig. The following was witnessed by Soyster and Peitz: At 11:00 A.M., 77 psig and at 11:30 A.M., 80 psig. At 11:33 A.M., the gas was bled of and flared. The pressure declined to 0 psig in about 3 minutes through a 1" nipple. A 29 sx. plug is set at 1340' - 1460' and the 7" casing packer is set at 12401. The well was swabbed down in approximately one hour. Swabbing produced 8.6 #/ga.l. mud, with some gas, The well is currently being swabbed do=m three times a day in an effort to clean up the formation. Perforations were reported as follows: 1330'-34'; 1320'-24'; 1278'-80' and 1270=72'. M. H. Soyster MliSoyster: mm:11/ 15/62 s-ssxn U L� U (Feb. Itabl) (SUJ l. IN TRIPLICATE) OCT 1 1962UNITED STATES X Cpnsery if�liM�TI IMENT OF THE INTERIOR v, S. C.OLOctCAL �Y%KCAL SURVEY . -1--- ---- - Ancha Re, Mas Budget Bcaau No. 49-R.3S8.4. Farm Approved. Lana oia-e Anchorage — 019 3 32 Unit. Hous :on -� SUNDRY NOTICES AND REPORTS ON WELLS co H C" z I N 5 NOTICE OF INTENTION TO DRILL ----------------- — ------ »._—. __._.. SUBSEQUENT REPORT OF WATER SHUT-OFF »------------- —---- ---- ;- NOTICE OF INTENTION TO CHANGE PLANS .................. .»_ ------ SUBSEQUENT REPORT OF SHOOTING OR ACIDIZING_____�»_ _»�4 NOTICE OF INTENTION TO TEST WATER SHUT-0FF_w._._-_..»------ SUBSEQUENT REPORT OF ALTERING CASING -------- _----- on _» NOTICE OF INTENTION TO RF DRILL OR REPAIR WELL--------- ------ SUBSEQUENT REPORT OF RErDRILLING OR REPAIR.-_—_ NOTICE OF INTENTION TO SHOOT OR ACIDIZE----------------- _ _»--- SUBSEQUENT REPORT OF ABANDONMENT -------------------- »_ NOTICE OF INTENTION TO PULL OR ALTER CASING ..-.......____ SUPPLEMENTARY WELL NOTICE OF INTENTION TO ABANDON WELL ------- -- ----- --- - X - --- ---- -- -- -- ------- ----------- ------------------ ------- ----:1 z 0 ca r1 (INDICATE ABOVE BY CHECK MARK NATURE Or RETORT. NOTICE, OR OTHER DATA) H September 26 62, Rosetta r r Well No. ..4A....--_ is located _.187b_ ft. from.- fN1 line and »4$6._.ft. from {al line of sec. 21 SW14 NW/4, Sec. 18 N 3 W Seward p ( 50C.ant Bte. No.) CrWP-) Raase Wildcat- »»_ Third Judicial Division Alaska �� o ----------- -�- --------- --- ---------- ---�------------------- ------------ ------- (Yield) (County or Sub( � ivlslon) Stata or Territomoi The elevation of the derrick floor above sea level is ._2b-_ ft. DETAILS OF WORK (State names of and expected depths to objective sandq show sizer. welghts■and lengths of pro sed aasincsi lndlaate snadding jobs, cemone- Ins points. and all other Important proposed Zoller TD: 24071; 23921 14 lb 5- 1/211 casing cemented with 450 sacks. Perforated Interval: 21801 , 2184= (2 holes/ft. ). We now propose to squeeze cement perforations with 35 sacks of construction cement and leave top of plug at 19301. Place 5 sacks cement in top of 5-1/2" casing and abandon well. The well will be properly marked and wellsite area cleared. I understand that this plan of work must receive approval In writing by the Geologieal Survey before operations may be commenced. Company -Anchorage.-Gas & Oil Development. -Inc. Address 134 East Second Avenue _-____ Anchorage.- Alaska _-__»__ By i liam D. �`o a Title ------Geo109ist GPa 914974 Company Anchora a Gab & Oil Develon- Location SW;r`, �ection 71,IlMn-,11 S.M. meat. Inc. Well No. Rosetta #4-A Lease No. Anchorage 019332 Your proposed plan of abandonment is approved subject to following conditions: 1. Compliance with Federal Oil and Gas Operating Regulations. 2. Changes in approved program must receive prior approval of the District Engineer or the Regional Oil & Gas Supervisor. 3. Oil or gas zones either previously productive or correlated with produc- tive zones must be protected by adequate cement plugs. 4. That portion of the hole between cement plugs shall be filled with heavy mud fluid. Top of the hole shall not be closed until the District Engin- eer or the Supervisor has been given an opportunity to inspect it. 5. Abandoned wells shall be marked with markers consisting of a pipe not less t than 4 inches in diameter and not less than 10 feet in length, of which 4 feet shall be above the general ground level and the remainder embedded in concrete. The top of the pipe shall be closed with a cap or cement plug and the marker should show in a permanent manner the name of operator, well number and location. 6. Equipment and valuable material shall be removed from the well site or dis- mantled and arranged in an orderly manner; junk and debris shall be removed or destroyed; pits and cellars shall be filled and leveled and the well site, including sumps, shall be placed iu a clean and orderly condition. 7. The hole should be converted to a fresh water wall if practical. 8. A subsequent Report of Abandonment on Form 9-331a, giving a detailed ac- count of all work performed, including location of cement plugs, casing pulled, casing left in the well, date of placing surface plug or cap, shall be filed in triplicate, within 15 days after completion of the work and the District Engineer or the Supervisor shall be notified when the well site has been cleaned up and is ready for inspection. Mailing Address: Office Address: U. S. Geological Survey Room 505, Cordova Building Box 259, Anchorage, Alaska Phone: Office BR -50511 Nite: BR -49141 FE -34722 HEIM 1-7,� LUJ UNITED STATES OCT 2 1962 DEPARTMENT OF THE INTERIOR GEOLOGICAL SURVEY Farm approved. Budget Bureau No. 42-R856.5. LAND OFFlce.__--_---- L.EASE NUMBEf( -0-1-93-32_______—__..�__, UNrc----------11cm S.tQA----------------- Coni~r:� �'tin+i Di,-ision U. S. c>LE€SSEE S- MONTHLY REPORT OF OPERATIONS=' Anchonige, A ❑1 'a i FC" 2 r2 1 State _aka-------------------- CountylThird_Judi.cial._Zist.Field ---- Wildcat ---F. ------�------------- -------- --- r The following is a correct report of operations and production (including drilling -and producing 7vells) for the nton•th of--Scptemhar---------------------- 1912_---------------------------------------------...-------------�_____-� .gent's address 13A_E-.__.2nd_Ava. . nch ragc,.AlaakaCompanyA c raSn.D.1-,1-- _Ili1 f% Phone ------ B$.-_4452 --------- --------------------------- -------------------geent's title _- Geale= i-- --------------- ------------ --- Sze. ANO 3: OP +,j Twp. RANOIt SVSLL 1O, n.raQALL013 p.aaaesa BLILMS Or OIL I L3a,\vtir CO, Fr. or (3As (In tLousaad3) or QABOLLNE R.COTEELD BAEHELs Or WATER (If nage, so state) REMARKS. (If d U , d.alb; it abut down. eau..; d.. rad rr¢it of test far...wia. Nfateat OL aY1 Ccr:pa y to Is 17ere tsed for a avor pra�ram fxcm Septfmbar 13-24. 1962. S Ij tmber P 1 , L b2 - ' agars opar t.ic:L to drill ' but cement in Rosetta 4A lhreli after seve al dyiya rigginj up. Ren 4 31411 bit on tlLbing. leaned ou ocr-3.nt plug i ` top of 1/2" c ging. Ran tubing and fours cement a 19521. Drilled to 19721. Shut do%n overnight. Spte. er 4, J9620IDrillad ce ent from 19721 to 207014 Shut own overnight. a pte or 5, 962- Slade trip Eor n w bit. Ran casing scraper,and Hit. Drilled to 21711. Shut dorm ovefight. b pte-. er 6, 962- Drilled c�-.�cnt From 2250 1 from 21711 tort 2251 1. C1; adocut stringers to 22741. Pulled bit and acr. her. Shut down. St ptelSar 7, 962- Waiting oi Schlumberger unit, Ri gad up abbing unit. Rigged up to p essure test casing Shut own overnight. S pts. er t3, X362-. Fressur(1 este casing with 540 p i for 1 Lin. OK. Schlumbar er r casant bind log rom 227 1 to 2001. Found good bond balmr 2006% a.ai top of camnt Zutaide of 5"A-11 casing at 6901 Schulumb rger perforated with 8 - 3 5/811 capsule jitt3 from 22261 to 22301. Ran Iia liburton 5111 RTTS pact: r as 43 joints tubing. Shut down overnight. 5 pteuoer 9, 962- Ran balvm a of tubing. Landed at 220513 Hall'burt n 5 11 RTTS packer 10.751 71.: joint 2 7/811 to inn 2194.60, TOT (15.601 , r r NOTE. ---There were _�.____�__..�IQ_runs or sales of oil; _� —_________ M cu, ft, of gas sold; runs or sales of gasoline during the month. (Write "no" where applicable.) Noa7.--Report on this form is required for each calendar month, regardless of the status of operations, and must be filed in duplicate with the supervisor by the 6th of the succeeding mouth, unless otherwise directed by the supervisor. Foran 9-829 (]anuary 1050) 1e—ssn" U. s. wri.w.rus PRINTING wnu i Form amrored. Buduet Bureau No. 42-R356.5. UNITED STATES Lino omcr__ Ancho rage DEPARTMENT OF THE INTERIOR LEASE Nu a U19332 ----�- -_ "�o u s fo ri------------ GEOLOGICAL SURVEY unrr._-------------------•---------------- .11 LESSEE'S MONTHLY REPORT OF OPERATIONS Third State Alaska --------------------- County Judicial tis#tic# FieldVildca# The follourind is a correct report of operations and production (including drillinj and producing :sells) for the month of tember 2 .lyent's address ---- E. Znd 1�ve, ----- age, Alaska Company chaTab'e_ a8_& Qil_DeInc. BR BR 4-952I -------------- agents title Plaone-------=-------------------- --- d' ------- Geologist ------- HEC. AND Of , ;i L1 Ttvr. RANnB 'WELL ND. D►ra P.anacca BARxLu or UR QR.LVITr CC, FT, of GAS (In tWG(19aI14�1) GALLons or aAsCLINE COVERED BARRZL9 OF WATER (Ii IIOnO� lu Elate) REAfARRS (If JrAi3ar- drp'N U Aut dawn_ Cause: ' date and =4 d tat for vZoliq, eoot.at of cu) ((cc n :fir. _iad -rom 1;a."¢ 1) Se ter -bar 1 , L 62- sht packert 22 00. 1-?ig ed up to cidize. (Yew perfs dere c ors eztlsugIzI to b flotlire load TIater out of ole in a strewn t e aloe of a PW cil). Shitted 200 igal. 5% I01 acid. Brot;e down perfs erith GCVO I:-31, pvcnped ec�d to - .t�:tian at 2� BFri 4 1600 psi S!i t do; --M .5 riga. Flo ed loud to to pat, r :covered a id w ter and ac !d gas in 45 win.1 Well began flown v tar and nitural Snap Dur �irg firs 5 lirs. Ise cold salt water ;.'v; Sao foL. n depth, �d a Rdi to froi: icy fo:-- F hick would build up 2-3 fec the fiam would i Lite ant, burn o£ the gas as the ubblea ex antic from the :e€st and broke. glowed well overslij f r 16 hra. and rate levels I cff to eat.. 5 BOPii and 50 CirM. Septe(nb r 2). l fit igged up o sq eese off perfse fr m 2226-22300. Nixed 25 sai onstructi n ca ant with I�ressura uid los additiv;. Displaced 20 acus to f r uat on, final 6G0 psi,hold for 60 min. Released p ease a and cem. ,� held Revs: se'ci k � out 5 88C.t3 CelAei with pcck4 hanging at 220 1. Pul ed 3 joints tubing aid left packer haw ing at 2105. S ut dvwn�21 hre. overnight. Se tem r 2 , 1 62 Pressure t sted casing wit 500 psi, bled off slowly to 400 Pc is 5 Ain. Well would floc a small � stream water the size o1 w f a pencil. Setpack-or at 2 an well still flowed small et) owered pe keg 4nd set at 2009, tubing did not floor any water ut casing annuus began t flow the small stream. Pulled tul d perfor ted rom 2180-21841 witl 8 - 3 x/81, capsule jets. Ran tubing and acker, batl�om at 21861. Spatted 200 gal. 5% t . cid. Broca dos forizatica with 1200 psi, pumped acid to fore tion at 2� BPN ' 1550 psi. Shut d sin 5 min., then flowed bacl loard wate and spent acid water tis pit in 25 min. Began €loti 15 BPIi of old exit grater and Hato al gas forming the sames9 frothy fo res reported for the previous zcne tested. Gaa bus ith a hot yell w and blue flame. Floved cverniZht, water anc as quit f maLng, water fl�ued at eat. ata of 15 BPH, gas urszod a a -eady flare at e3t, r to of 2CO CiGPH. Nora.—There were ---- ------- __ runs or sales of oil; _I jM_--------------- –.... M cu. ft. of gas sold, �__...___rune or sales of gasoline. during the month, (Write "no" where applicable.) NOTE.—Report on this form is required for each calendar month, regardless of the status of operations, and must be filed in duplicate with the supervisor by the Oth of the succeeding month, unless otherwise directed by the supervisor. Forts 9-829 (January RN) 15-23:0-9 u. I. corce.rt.r m effm oma i Z1 ta- ring to reed I r UNITED STATES DEPARTMENT OF THE INTERIOR GEOLOGICAL SURVEY Form approved. By 4epClireAu No. 0 iSe42-8356.6. LAND OF'FICEE_�__-___$1.f] LEASE NuploEt istwr------------^__---- UNIT ----- ------------------------- -y__� LESSEE'S MONTHLY REPORT OF OPERATIONS Third Alaska_ ________ CorcntJ _Judicial District-- Field I5 ildcat State ---------------- --------- ---------------------- The following is a correct report of operations and production (i7tcludinb drilling and prodI8Ci7Li wells) for the 7non th of _____ est alser_.__.___�..__._. 19...62, .2gent's address 13q.E.__Znd Ave, Anchorage, Alas3k� Anchors a Gas & Oil Dev Inc. ---------- ---................ ---------a.. Signed - - ---`c ------------------ ---- ---- ---- -------------- Signed .... u. - - - -- ----- Phone ..------------ ------------------------------------ -Igent's title --------- Geolo ist _..----------------------- SEC. Asn �• Or !( Twr. RANGE WELL No. Mae PAODUC[D DAMEL! Or OU, QaACtir CII. F:. or 0.%3 (Fn thousands) QALLOss Or GAS LINE $EfovEE=O DA%HEL9 Or WATIM (If none, sU state) REITARRS (It drininc. depth: It shut down. Cause: "' and r"ult of telt for 8"0;30 wnteot of Cas) (C ont uea T fro Pag 2) kk Se to ar 2!, 1 62 nseated p, ckerand 'pulled and layed clown Lubin-, I:ixed 35 sacks cement an displaced down cajj ng w-itli 47 bbl.unLter, squeezed o f pellformations at 2180-21841 with 13 sacks into ormation �losed ' 10G psi, topf certant plug i casing at 13301. cal "ng i to wait an cement Se er 2 , V6 laiting on cep .e t. Se. temis�or 2�+, 1 62 Placed 5 s cks errant in iiop of 5 casing ,and abandoned wcll Norffi.--There were --------- ____--- runs or sales of oil; M cu. ft. of gas sold; ..__ No runs or sales of gasoline during the month. (Write "no" where applicable.) NOTE.—Report on this form is required for each calendar moaLh, regardless of the status of operations, and must be Sled In duplicate with the supervisor by the 8th of the succeeding month, unless otherwise directed by the supervisor. Form 9,829 (January ]7980)30) t6-23746-9 p. f. rarnsseuf PRIMING OFFICE C~'[ION APPLI " FOR PERMIT TO DRILL, DEEPE ,~R PLUG BACK APPLICATION TO DItIL[, Fl NAM I.; OF ('(D,~i'ANY OR O?ERATOR DEl~PEN [] PLUG BACK. [] DATE · ' ~- Oil Dcvc!opment, inc. ~nchora~.e Addre:;:~ City DE$CI%IPTION OP %VI.~LI, AND L]z2ASIg State lease [ %Vell number 019332 \'J,-il lr.,:.tricm (give footage from section lines) Sec~irm--[ownship--range or 1)lock ,~ survey ., z:rcn~N line & ~oz., from %V ~ine of Sec. Zt T !8 N = 3 I%' '~ ~ ~ Fi,'.hl ,% rr.;orvolr (If wildcat, so state) =::plo rate :y County Third 5'u~cia! District Distance. in miles, and direction from nearest town or post office Nca,',.':~t disL;'m¢:o from proposed location to prol)crty or lease line: 187 '6 feet Distance from proposed location to nearest drilling. cc~ml)Icted or 2Jlk)li~d--for wall ~)n tl~e same h;a~e: ~.~rz'~'ox Y0 It %vest ~ ~ .~ sou~n Of ~osatta 4 feet Proposed depth; Rot~try or cable tools Rotary Approx. date work will stari Septarnbcr 15, 196Z ~llr~l)er of acres in lease: 21ZO Number of wells on lease, including this v-ell, completed in or drilling to ~his re~ervoir: 2 (l~etta 3 & [f lease, purchased with one or more wells drilled, from whom purchased: Name .. Address Status of bond Curren~ Remarks: (If this is an application to deepen or plug back, briefly describe work to be done, giving present producing zone and expected ne~v producing zone) ~ Z39Z' 14 lb. 5-1/Z" casing cemented ~'~1 450 sacks of construction c~,~en+~:",us~- placed ~ Z I 1 5' , 1975' ~%d at top of 5 t/Z ~ ~'~'," Well pz'cs~ntty suspended. cement bond log and te~t well for %VSO. SqUeeze cemcn~ resinS if. necessary. Selectively perforat~ attractive s~ds'and test %vc!i for possible co~mercia! production. Con~plete %veil if con~u~ercial or plug ~ud ab~don ~ non-co~crcia!. ~ CERTIFICATE: I. the undersigned, state that I am thei~2'Cs!~OP't of the Dove!oprncr:t, .mc. % (company), and that.I am authorized by said company to make this report; and that this report was pre- pared under my supervision and direction and that the facts/~'at.~ therein are true, corr~c~ a~ci to the best of my kno wledge. Signature / Permit Number :. Sc~Scc~cr !2~ 1962 Approval Da%e: ~'~:~(,.~// /// . ~.,//~.~/ ,~ App~cation to ~ri.. ~eepen or P luz Back Approved B~: Notice: Before sending in this form be sure that you have given Author~ed by Order No. 1 all information rcquested. Much unnecessary correspond- once w~ thus be avoided. Effective October See Inst~ction on Reverse Side of Fern Form 9-1125 (Rev. Dec. 1957) SUBMIT IN QUADRUPLICATE ~~ tO appropriate Regional Oil an~ (~as or Mining Supervisor) DESIGNATION OF OPERATOR The undersigned is, on the records of the Bureau of Land Management, holder of lease DISTRICT LAND OFFICIO: ~ SU~L No.: 019~ and. hereby designates as his operator and local agent, :with full authority 'to act in his behalf in complying with the terms of the lease and regu:lations applicable thereto and on whom' the supervisor or his representative may serve written or oral instructions in securing compl!ance with the Operating Regulations with respect to (describe acreage to which this designation is applicable): . : . It is understood that this designation of ,operator does not relieve-the lessee of responsibility for compliance with the terms of the lease and the Operating Regulations. It is also understood that this designation of operator doe's nOt constitute :an assignment:: Of any interest in the lease. In case of default on the part of the designated operator, the lessee will make full and prompt compliance wi~h all regulations, lease terms, or orders of the Secretary of the Interior or his representative. The lessee agrees promptly to notify the supervisor of any change in the designated operator. (Date) (Address) U, $. GOVERNMENT PRINTING OFFICE 1% C; Linn -RUV., 9 SEP 13 1962 Hr. gorge H. Tucker, President Anchorage Cas & Dil DD3valopx;nt, Inc. 134 East Second Avenue Anchorage, Alaska Dear S i r: Conservation Division U.S. GEOLOGICAL SURVEY Anchorage, Alaska Saptembar 12, 1962 f FSq.T E D EP 13 11. Scxfstrr Please be advised that your application to re -water and test Wool Ho. "Rosetta" 4-A, Sec. 21, T.16N.9 R.U., Seward Marldian, is apprcrmd subject to the following provisions; 1. Hud fluiJ of sufficient weight and proper consistency to prevent blowouts shall be used in cleaning out the yell and a columa of mud fluid shall be m-3intaincd to the sursfacce at all ti=3, particularly e,111a psliin.the c3r111 pips. 2. Adaruate blo:iout prevention equipment shAll ba provided and tented before pc_f0rat ,a- the 5�" caaino =I, :aintained randy fov use at .-k1l tila.a. 3. A anter shut-off shall be dcctcnstrated thrcugh gun perforatio:m above the bi,ohost sand to betested for production. 4. THIS DIVISIM SMALL BE NOTI.PIED AS FOLLLvS: a. To vitncsa any production test. b. Prior to abandonment, if well 10 eon-cocurciai. Piu"ing Procedures will be rnttlined at that tie-. DDH : ks cc: William Folta M.H. Soyster James A. Willie= Yours vary truly, `x, -zed �4�Zee_,,F Donald D. Bruce Chief, Petroleum B=unch 12 i •� L�11 Form 5-s3L n (Feb.1061) C T_ (SSjgq IN MLICATE) DEPS GE(��iGEALSTMK§ �jM `&QWT_HE INTERIOR GEOLOGICAL SURVEY ABudget Bureau No. 44-R3S8.4. Form Approved. Land ofRee _Anchosagr__ Loa"Na. ---019332 Unit Houston_,___-_� SUNDRY NOTICES AND REPORTS ON WELLS NOTICE OF INTENTION TO DRILL__.--.---------------------------- SUBSEQUENT REPORT OF WATER SHUT-0FF__------------------------ NOTICE OF INTENTION TO CHANGE PLANS ------------------- -------- .........--_ 1 1 --- C T_ (SSjgq IN MLICATE) DEPS GE(��iGEALSTMK§ �jM `&QWT_HE INTERIOR GEOLOGICAL SURVEY ABudget Bureau No. 44-R3S8.4. Form Approved. Land ofRee _Anchosagr__ Loa"Na. ---019332 Unit Houston_,___-_� SUNDRY NOTICES AND REPORTS ON WELLS NOTICE OF INTENTION TO DRILL__.--.---------------------------- SUBSEQUENT REPORT OF WATER SHUT-0FF__------------------------ NOTICE OF INTENTION TO CHANGE PLANS ------------------- -------- SUBSEQUENT REPORT OF SHOOTING OR ACIDIZING-__--^....-.�. NOTICE OF INTENTION TO TEST WA HUT-0FF___..».....__ 1 �E31�__}C x- SUBSEQUENT REPORT OF ALTERING CASING ___.-___„_.�..__.__..�.. NOTICE OF INTENTION TO RE -DRILL . SUBSEQUENT REPORT OF RE -DRILLING OR REPAIR.._._— . NOTICE OF INTENTION TO SHOOT OR ACIDIZE--------------- SUBSEQUENT REPORT OF ABANDONMENT --------------- f NOTICE OF INTENTION TO PULL OR ALfM CASING .....—..^-- _---- SUPPLEMENTARY WELL HISTORY -------- — ----- — ---- -------_ NOTICE OF INTENTION TO ABANDON WELL _...... —_---------- ------ -------------------------------_-----------�--------------__— --. (INDICATE ABOVE BY CHECK MARK NATURE OF REPORT. NOTICE, OR OTHER DATA) September 10 t� i -) 4- �1 L 19.62. Rosetta O� Well No. _ 4�A_____..._ is located _ 1876__ ft. from INI line and _.. 486-- ft. from IW} line of sec. 21__ �s SW/4NW/4, Sec. 21 18 N 3 W Seward; (}f sea. and sea No.) (Twp.) ------ i�eJ - ---------- @ierldiaaj---_.--.. _Exploratorar___ __ _ ______ _Third Judicial Division _ Alaska ---------------------------------------- -- ---...7 -------------- ------- -- (Field) (County or subdivision) state or Territory) The elevation of the derrick floor above sea level is 326.--. ft. 0 DETAILS OF WORK (State names of and aapeeted depths to oblective sands; show sizes, wolghts�and lengths of propowd u$ntst Indicate mnddtn=fobs, ra�aseat4. Ing points, end all other Important proposed w07 Present Status: T. D. 24071 2392= 14 lb. 5-1/21' casing cemented with 450 sacks of construction cement. Plugs placed @ 2115T, 19751 and at top of 5-1/2 casing. Well presently suspended. Proposed Work: Reenter well and drill out cement to approximately 23601. Run a cement bond log and test well for WSO. Squeeze cement casing if necessary. Selectively perforate attractive sands and test well for possible commercial production. Complete well if commercial or plug and abandon if non-commercial. I understand that this plan of work must recite approval in writing by the Geological Zur.ey before operations may be commenced. Company ..._ chorage_Ga_s_& Oil Develo Address 134 East Second Avenue Inc. Title-------------------------------- — President GPO 91497A 7 Company Anchorage Gas & Oil Dev. Co. Location Houston Area Well No. Rosetta #4-A Lease No. A-019332 Drilling operations as proposed by you in attached Notice of Intention to Redrill and Test are subject to the following requirements: 1. Compliance with Federal Oil and Gas Operating Regulations. 2. The date actual drilling is started shall be reported promptly to the Regional Oil & Gas Supervisor. 3. Any change in the approved program must receive prior approval of the District Engineer or the Regional Oil & Gas Supervisor. 4. All pertinent data, including electrical logs, directional sur- veys,core descriptions and analyses, stratigraphic and faunal determinations, formation tests, and similar information shall be submitted in duplicate. Electrical logs and similar surveys. and the results of formation tests should be submitted as soon as the records are available. Other data not previously sub- mitted shall be included in or submitted with the log and well history, 5. All rigs or wells shall be permanently marked in a conspicuous place and should show name of operator, lease serial number, number designation and location of the well. b. Install adequate blowout prevention equipment and maintain in good condition at all times. The rams should be tested at frequent intervals by opening and closing and against pressure. 7. Lessee's Monthly Report of Operations (Form 9-329) covering all operations and production on this lease should be submitted in duplicate prior to the fifteenth of the following month. 8. A detailed plan of -any perforating and testing must be approved by the Supervisor prior to commencement of such work. Proper notices, giving specific details of work performed, must be filed promptly with the Supervisor (See Federal Regulation 221.58). Mailing Address Regional Oil & Gas Supervisor U. S. Geological Survey P. 0. Box 259 Anchorage, Alaska Office Address Room 505, Cordova Building Telephones: Office - BR 5-0511 Night - BR 4-9141 FE 3-4722 APPLICATION FOR PERMIT TO DRILL, DEEPEN OR PLUG BACK } . APP_LICATI(~N TO DRILL [] DEEPEN [2] PLUG BACK S. P. eel~.er I~ Telt NAME OF COMPANY OR O~'ERAT0'~ ~' :~ ' ~ - ~' ~ n~E ~ep 10, lgb~ . .~ 134 ~mt See~ A~n~¥ ~:~o~ale. ~m~ .::- ..... ' · - Name of lease .1 }V~I~ number ] Elevation (ground) ~. ,:, , . , · , %Veil location (giye footage from section lines) Section--township--range or block & survey Field & res~rvo:i~ (~IL~w~Hdca,t:~ so~!ate):c : ~ -~.;~ ~_ ~ i~ -:: .E=ploratory Distance, in miles, and directio'n 'frOm 'flearest town or post office Nearest distance from proposed location to property or lease line: 1876 feet IDistance from proposed location to nearest drilling, c~mpleted or ~l~Vli/Kl--for wgll'a)n Lhe.~ame le~$e: of ~$e~ 4 feet Proposed depth: Number of acres in lease: 2120 IRotary or cable tools Approx. date work will star~ September 1 S, 1962 Number of wells on lease, including this well, completed in or drilling to this reservoir: Z (P, owe~ 3 & 4-A) If lease, purchased with one or more wells drilled, from whom purcha§ed: Name Address Status of bond Current Remarks: (If this is.an application to deepen or plug back, briefly describe work to be done, giving present producing zone and expected new producing zone) Present S~at~o: T, D. Z3~' 14 lb. S-1/2' ea~ ememd ~ 4S0 oa~ ~ conw%~c~n c:~. Plqw ph~~ 2liS'. lgTs' ~at ~p of S-I/2 eawhf. We~ pre~ ~~ P~s. Work.: b~r we~ ~ d~ out, cma M a~~tely"%~0'. ~u a c~nt ~ bS ~ ~ot we~ bz W~. ~uese cem~ eawhf ~ neces~, bleeflvely peter, s-a~racflve ondo'~ test woH for ~ooibb ~..t~ p~~~. G~lete wea ~ ~~erchl or Anchor&to CERTIFICATE: I, the undersigned, state that I am th~Prelidm~t ct the Dovelop~tut, (company), and that I am authorized by said company to make this report; and that this report was pre- pared under my supervision and direction and that~ therein are true,,, c~d~etecor d co ere to the best of my knowledge. Sign~t~e'~"-er7 Permit Number: App rov ai D ate: ~~"~ Approved By: ' ~&! ~u~o~ Jiraueh~--I Notice: Before sending in this form be sure that you have given all information requested. Much unnecessary correspond- ence will thus be avoided. See Instruction on Reverse Side of Form Alaska Oil and Gas Conservation Commission Application to Drill, Deepen or Plug Back Form No. P-1 Authorized by Order No. 1 Effective October 1, 1958 Department of the Interior Geological Survey Conservation Division Branch of Oil and Gas Operations Alaska Region MONTHLY BI~IIIEERII~ REPORT September, 1962 Discoverie,s qn ,Federa_l ,Lease, s None. Unit A2reemegts Union Oil Company's Pittman unit agreement was approved by Acting Director A. A. Baker on September 14, 1962 and desi~mated #14-08-0001-8248. The unit contains approximately 46,659.68 acres in the Hatanuska Valley, approximately 25 miles north of Anchorage. The initial test well, scheduled to drill to the 8,000t required depth, was plugged and abandoned with our approval May 27, 1962, at a depth of 6,136' after encountering a hard, dense formation below 5,800 feet. Richfield 0il Corporation's KaliakhRiver unit agreement, #16-08-001-6670, was terminated effective September 1, 1962, at the request of the operator. Two dry holes were drilled in this area during the rem of the unit. The unit was located in the Cape Yakataga area of the Gulf of Alaska. Standard Oil Company of California has requested approval to terminate the Chaix Hills unit agreement in the Icy Bay region of the Gulf of Alaska. Upon approval by the DirQctor, the request, filed September 10, 1962, will become effective October 1, 1962. Two dry holes were drilled in the unit area during the term of the unit. Richfield 0il Corporation has requested an amendment to the recently approved designation of the Wide Bay unit area on the Alaska Peninsula. The anmndment would increase the size of the proposed unit area from the approved 126,500 acres to 173,859.79 acres, as originally requested in the application. The amendment is currently being processed. · '%~...e initial participating area for the "E" gas zone Kenai formation, Swanson River unit waS processed and forwarded to Washington for review on September 10,. 1962. This is one of three gas zones within the field which will be.used to rapressura the Hemlock Zone oil structure. Pure Oil Company has requasCed and received approval to withdraw its applica- tion for the Nushagak unit area, designated as a logical unit area by Survey treated like every honest-to-goodness Alaskan and any attempt to create reservations for us or something similar Co it is against or basically against the thinking of the Eskimo", Standard Cc~w_eaces Step OUt T~st_$n.$w~nson River .Unit _ On September 29, 1962, Standard Oil Company of California ccmnenced drilling its step out test well to the northwest of present production in the Swanson River Unit in order to retain the unit area in its present size. By the terms of the unit agreement, drilling must be in progress outside o~ the existing participating area on October 1, 1962 to prevent the reduction of the un£tized area to part£cipating area size, Recent developments have caused Standard to reconsider the acreage for possible deeper pay zones. Retestin2 of Houston Well.. Proves .F..ruitles~s Anchorage Gas and Oil Development Company reentered HackathornSs abandoned Rosetta #4-A well for further testing during September. The well is in the proposed Houston unit in the ~atanuska Valley north of Anchorase, Tests in the vicinity of 2,200~ produced salt rater and the hole was once asa£n plu$$ed and abandoned. ~Io2 LOCATE WELL CORRECTLY ~:. :u ~.,~-~ ©~'~cz --wra~ ........... SERIAL NUMBER .............................. LEASE OR PER~IT TO PROSPE~ ......... UNITED STATES DEPARTMENT OF THE INTERIOR GEOLOGICaL SURVEY LOG OF OIL OR. GAS WELL Hacl~athorn Driliin~ Company 134 E. Second Ave. Anchorage, Alaska Company ......................................................... Address ....................................~. ........................ Lessor or Tract Anchorage 01933Z Field Wildcat State Alaska 4-A 18N 3V? · · Se~rd Co un ty ~r~__~_~_~_~__~ ~_~!~ t Well No. _, .......... 8~ ....... T ....... R. ,_Z__ Merl&an ........................... B. (De~ck ~r r~atlve to ~ea lev~) The ~o~ation given herewith is a complete and co~ect record of the well and ah work done thereon so far as can be determ~ed from ah available records. _ Si~ed ................................................ D a ~ _ _~_~~- ~_~A__~_~_ ................ Ti tle ...... ~S ~_ ~ ......................... The su~a~ on this page is for the condition of the well at above date. Co~enced ~ing ................................. , 19 ...... Finished dr~Eg .................................... , 19 ...... OIL OR GAS SANDS OR ZONES No. 1, from ........................ ~ ....................... No. 4, from ........................ to .......................... No. 2, from ........................ ~ ........................ No. 5, from ........................ to .......................... No. ~, from ........................ to ........................ No. 6, from ........................ to ........................... IMPORTA~ WATER SANDS No. 1, from ........................ to ........................ No. 3, from ........................ to .......................... No. 2, from ........................ to ........................ No. 4, from ........................ to .......................... CASIN~ RECORD Perforated Size Weight Threads per Make Amount Kind of shoe Cut and pulled from ! ]Purpose casing per foot inch From-- ,-,,_ ~;;ofa H. blnP~a ~t ,~uq~e~ ~e,~;~.~ mr ~ ~o ~¢.~ ~o~ ~,;~t~ ~:'~c ¥!-,z~q oL -'-'~::~Yl ~acq' bo?r~wn .~cs ~.'.::~.~.,{.~ ..... ~T~j~-6U[~£~.-~7~. . fg~i~.-~-TqifB2~£~f£~, '-~b--~tCZb-~- iS/fiS.f~--I]~] :,ti ........................................................... o~. Hm ..-'-.,;i! .?...!~s ~;.'..'{,; ~k, c~o, :~.~i f?; :~:~, i .............. ~ ..................................................... . ................................................................. : ............................. ........................................... _h_'=1 _~ It&_o__~L__o_! ~. _ ~ LU__ L-i1~___~: 'Z~:~:. 2_A_ _.F._ _U~ ........ ;, ..----;= zi-.-: .... !!il ............ r ..................... ~ ..... i 1 ............ .',- .......................... 4 ........ ........ --' ................... ................ [ ...................................................... I ............................. MUDDING AND CEMENTING RECORD Size Wher~ set Number sacks of cement ~ethod used Mud gravity Amount of mud used easing i ~ : i ...................... ~ ........................... ~ ............................ ~ ........................................................................................ ..................... T .......................... i ........................... + ....................................................................................... · , SHOOTING RECORD Size ~hell used Exp !oslve used Qu flty Date Depth shot Depth cleaned out ...................... ~ ........................... ; ........................... 4- .................................................................................. TOOLS USED Rotary tools w. ere used from i feet to __~ ............feet, and from feet to feet Cable tools were used from ........ ~ ............feet to --i ............. feet, and from ............... feet to ........... feet i t~ D~TES 19 ...... Put to - ~ :--prouucmg ..................................... , 19 ...... ' i was ...... The prodU~ction for the first 24 hours i ...... barrels of fluid of which ......... % was oil; ......... emulsion; .....~% water; and ..... ~% sediment. ; Gravity, °B6 ..................................... [ If gas wel~, cu. ft. per 24 ho~rs .................... GMlons go. sol/ne per 1,000 cu. ft. of gas .................. Rock pressure, lbs. per sq. i~ ....................... EMP ~.OYEES .................................................... , Driller ~ .................................................. , Driller ..................................................... , Driller ,, , Driller FORMATION RECORD FROM-- TO-- TOTAL FEET FOBMATION ;urface i Z i Z Coal 12 100 88 Shale, black 00 150 80 Sand, arkosic 80 35O t70 Silt.st0ne, soft. ~orne coal ~tringer~; Coal 335.-350 50 500 150 S~le, black, t~oft; some coal ~tringers and ~in eand~ [ 80 SHtztone, b~ck, ~rd; zome coal. 80 800 ' ZZO $~le, black, soft; some coal stringers ~d ~n sands; ch~. 58 Florm 9 -awn (Feb. I951) FA rii@EOWErerNJ DP �a��L �GRAG FEB 9 oMmrr iN TRIPLICATE} Conservation DUN UNITED STATES U.S. CEQEJZAB.l7�tFiN;' 1W THE INTERIOR Anelhorage, &-&OGICAL SURVEY Budget Bureau No. 42-11358.4. Appm►a1 expires 12-31-m. L.nd orsce_Amchoraae--- Lee. No. shit --------- SUNDRY NOTICES AND REPORTS ON WELLS NOTICE OF INTENTION TO DRILL ---------------- --- --------- ------ SUBSEQUENT REPORT OF WATER SHUT-OFF --- ------------------- ----- NOTICE OF INTENTION TO CHANGE PLANS ----------------- --__ ------ SUBSEQUENT REPORT OF SHOOTING OR ACIDIZING---- --- ------ -._.- NOTICE OF INTENTION TO TEST WATER SHUT-OFF -------- —--- ------ SUBSEQUENT REPORT OF ALTERING NOTICE OF INTENTION TO RE -DRILL OR REPAIR WELL_________ _____ SUBSEQUENT REPORT OF RE -DRILLING OR REPAIR._-_.--__.__._.—. NOTICE OF INTENTION TO SHOOT OR ACIDIZE--- — ------------- ------ SUBSEQUENT REPORT OF - - _tSuspensio.A.__..___ NOTICE OF INTENTION TO PULL OR ALTER CASING-- --------- ______ SUPPLEMENTARY WELL HISTORY___________________________________ - NOTICE OF INTENTION TO ABANDON WELL --------------------- ------ --------------...------------------------------------------------------ (INDICATE ABOVE BY CHECK MARK NATURE OF REPORT. NOTICE. OR OTHER DATA) ---------------------------January- 31------ -- -r f 962 Rosetta N • } 21 Well No. ------ 'A__-_- Is located � �? 6.._ ft. from._ � }line and ,`18b.._. ft. from I line of sec.._ SW/4 NW/4 Sec. 21 ----------------------------------------- --- 0J Ike. anS See. No.) Wildcat ------------------------------------------- {Fleld) / W 18N 3W Seward ----------------------------------- e -- --------- ...... --- (TWO ( C) (Merldiaa ---------- (County or Subdivision) (State or Territory) The elevation of the derrick floor above sea level is __326.... ft. DETAILS OF WORK (State names of and expected depth% to objective sands{ show sixes, weights, and lengths of proPorad casing%1 Indicate mudding jobs, cem. Ing points, and all other important proposed -ark) Present Depth: 2407 feet Casing: 406 ft. S-5/8 in. surface casing cemented with 175 sacks of construction cement. 2392 ft. 14 lb. J-55 5-1/2 in. casing cemented with 450 sacks of construction cement. Perforated (1990; 2068-2073; 2105) Intervals: All casing perforations were squeeze cemented with 35 sacks of construction cement and a cement plug was placed at 1975 ft. Another cement plug was set in the top of the 5-1/2" casing with 10 sacks of construction cement. All drilling equipment remains upon the lease at the present time, and will be either removed from this lease or placed in operation during the summer of 1962. understand t sett . plan of work must receive approval in writing by the Geological Survey before operations may be commenced. Company ____ Hackathorn Drillini- Company _- Address5_M__iclland_Say_ Denver 2, Colorado B '`� , `L� Zr���-- .-' ------------- - --------------------------- ---- y ----- -- -:— r: -- ---------= - -- William D. Folta ' Title-----.Gealogist cc: Alaska Division of Mines & Minerals GPo eez040 \ t \T) T Department of the Interior Geological Survey Conservation Division Branch of Oil and Cas Operations Alaska Region 0 CT 1 7 961 HONTHLY ENGINEERING REPORT September 1961 PART I,.AI)HINIS~IVE -.REGULATORY - COOPERATXVE Discov. erie~ on Federal Lease~ None. Unit .Ascreement S Application for des i~nat ion of the Bering River Unit area, submitted by Richfield Oil Corporation and comprising some 54,122 acres in the Katalla-Yakataga area of the Gulf of Alaska, was approved on Septem- ber 6, 1961 by Acting Director R. H. Lyddan. Unit Agreements~ sub- mitted by the operator September 21, 1961, are currently bein$ processed Application for designation of the White River Unit area~ submitted by Richfield Oil Corporation and comprising some 101,214 acres in the Cape Yakataga area of the Cull of Alaska, vas approved on Sep- tember 5, 1961, by Acting Director R. H. Lyddan. Unit Asreenmnts, submitted by the operator September 6, 1961, are currently bein$ processed. AppliCation for des i~nat ion of the Anchor River Unit area, submitted by Standard Oil Company of California and comprising some 16,931 acres on the Kenai Peninsula was approved on September 27, 1961 by Actin$ Director R. H. Lyddan. Richfield~s proposed Canoe Bay Unit Asreement was transmitted to ~ashinston September 27, 1961. The unit contains some 66~316 acres (revised) and is located in the Pavlof Bay area of the Alaska Penin- sulas Unionts proposed Fish Creek Unit Agreement was transmitted to Wash- ington on September 28, 1961. This unit contains some 35,167 acres and is located in the Knik Arm area of Alaska. Standard*s proposed Chaix Hills Unit Agreement was forwarded to Washington on September 29, 1961. This unit contains 82,326 acres and is located in the Icy Bay area, Gulf of Alaska. Request for change of designation of operator of the Iniskin Penino sula Unit was received September 26, 1961. Balco Petroleum Corpo- ration is the proposed operator and will replace Iniskin Unit Operators, Inc. T.. 22 S.~ R..25 E., Chaix Hills #1, Standard Oil Company,of Cali- fornia, Anchorage 023567, SW%, section 4. Elevation 1350' K.B. SpuddedS/lO/61. Casing: 20" @ 105' w/510 sx; 13-3/8" @ 1415'. Drillin§ at 5462 feet. T. 31S.~ R. 39 .g.~ Core Hole #3, Colorado Oil & Gas Corporation Anchorage 025038, SW%, section 6. Elevation 36' K.B. Spudded 8/15/61. Casing: 13-3/8" @ 30' w/5 ax; 7-5/8" @ 508' w/135 sx. T.D. 5484', P & A 9/27/61. T.- 32 S.~.R~ 4~ E~ Core Hole #4, Colorado Oil & Gas Corporation Anchorage 032319, SE%, section 27. Elevation 14'~. Moving in rig. SEWARD, I~RID ,LMN T. 7 N.~ R? 78 ~;. Napatuk Creek #1, Pan American Petroleum Corp- oration, Fairbanks 018048, SW~, section 34. Elevation 64' ;.B. Spudded 3/20/61. Casin;: 13-3/8" @ 1990' w/800 sx; 9-5/8" @ 5839' w/850 sx. T.D. 14,901'1 No shows of oil & insignificant shows of coal gas. P & A approved 9/12/61. T., 8 N., R. 14.~., West Foreland #1, Pan American Petroleum Corp- oration, Anchorage 035017, SEk, section 21. Elevation 100'~. Buildin~ roads and location. ~T. 12 N., R. 12 W., Stedatna Creek #1, Pan American Petroleum Corp- ation, State lease ADL 03197, SE%, section 30. Elevation unknown. Buildin§ roads and location. T.~. 18 N.~ R. 3 W'~ Rosetta 4-A, Hackathorn Drilling Company, (An- chorage Gas & Oil Development, Inc.) Anchorage 019332, N~%, sec- tion 21. Elevation 317' grd. Spudded 7/12/61. Casing: 8-5/8" @ 406' w/180 sx; 5-1/2" @ 2392' w/450-ax. T.D. 2407'. Perforated and tested interval from2155-2235 feet. Recovered salt water w/ slight amount ofgas. Preparin§ to squeeze off perforations and test between 2065-2080 feet. T- 4 s.~ R._ll. W..~ Anchor River #1, Standard Oil Company of Cali- fornia, Anchorage 028477, S~, section 20. Elevation 1465'±. Building roads and location. T.'.8 N.~ R. 7 W.~ Swan Lake Unit #34-27(1), Standard Oil Company of California, Anchorage 209160, SE%, section 27. Elevation 300' K.B. Spudded 8/6/61. Casing: 20" @ 130'i 13-3/8" @ 1877' w/1800 sx. T.D. 11,984'. No shows of oil or gas. P & A 9/25/61. T. 16 N., R. 3 W., Fish Creek ~12-8(1), Union Oil Company, Anchor- age 022769, NW%, section 8. Elevation 141' K.B. Spudded 9/3/61. Casin§; 11-~/4" @. 1110' w/840 sx. T.D. 6418' in igneous rock (cored). No shows of oil or gas. Preparing to P & A. 11-8 Department of the Interior Geological Survey Conservation Division Branch of Oil and Gas Operations Alaska Region MONlliLY ENGINEERING REPORT August 1961 ~A~,~ I, ADMINISTRATIVE - REGULATORY - COOPERATIVE Discoveries on Federal Leases None. Unit A~re.ements_ The Sterling Unit Agreement, submitted by Union Oil Company and comprising some 63,618 acres in the Kenai Peninsula, was approved July 7, 1961 by Acting Director Arthur A. Baker. A discovery gas well was completed in this unit August 4, 1961 with an AOF of 36,000 MCFPD. Application for designation of Bering River Unit' area, submitted by Richfield Oil Corporation and comprising some 54,122 acres in the Katalla- Yakataga area of the Gulf of Alaska, was received August 7, 1961 and transmitted to Washington on August 23, 1961. Standard Oil Company's Proposed Chaix Hills Unit Agreement was received August 15, 1961. It comprises some 82,815 acres in the Icy Bay area, Gulf of Alaska. Standard spudded a test well on this acreage 8-10-61. Richfield Oil Corporation's proposed Canoe Bay Unit Agreement was received August 21, 1961. It is located in the iavlof Bay area of the Alaska Pen- insula and comprises some 64,941 acres. Pure Oil Company has been designated as the sub-operator of this proposed unit and is currently drilling a well, spudded 8-26-61, on the acreage. Application for designation of the Anchor River Unit area was submitted by Standard Oil Company on August 16, 1961. It comprises some 16,931 acres on the Kenai Peninsula. Standard is currently preparing a drill site within Chis area. Application for designation of the Houston Unit area was received in August from Hackathorn Drilling Company, designated operator for Anchorage Gas and Oil Development Corporation. The proposed 33,459 acre area was not acceptable in its present rom and was returned to the applicant for further revision. '----- Unit No. 23-15 (1), Union Oil Company discovery ~ R 10 W Sterling - - T D. 1~832 ~__~N_~. £~-~-~o~ 028135, S~ section 15. Spudded 5 ~eet. Cas~n~: ~3-3/8"-ZZZ/ ~uV/~[~ ~__~i~4on ~ac~r aC 5,208 and T 7 H~ R 78 ~ Napa~ ~eek No. 1, Pan ~erican PeCro~e~ Co~po~aC[on, ~a~=bm~s 0180~8, ~ section 36. Elevation 5~~ std. S~d~d 3-20-6~. Cestn~: [3.3/8,,.1990~-800 sx., 9-5/8'''5839 ~ '850 sx. Dril~i~ ac 1~,680 T [8 N, X 3 ~ Rosette ~-A, ~chorase Gas & O~ Develo~n~, Inc. '(H~t~rn ~il[[ns C~pany), Anch6rase 019332, ~ sec[Ion 21. Elevation'317~ ~d. Spudded 7-12-61. ~inS: 8.5/8,,.~06~-180 Dr~llin~ at 2,325 ~eet. ~5~ S~ R 78~ Canoe h~ ~o. L, hre OiL C~pany, ~choraSe 05225~, I~ section 8. Elevation 1~0' K.B. Spudded 8-26-61. ~s~ns: 24"- ~ 27'. DrillinS at 450 T 8 N~R 7 ~ Swan Lake unit No. 34-27 (1), Standard Oil C~pany of ~al~iornia~-~chorage 029~60, S~ section 27. Elevation 3~' ~.B. Spudde~ 8-6-61. CasE~: 20,,=130,, 13-3/8"-~877'-1800 a~ 8,511 · A S. ~ 11 ~4 Anchor River No. ~, Standard ~477- S~ section 20. Elevation 1465~. Building roads an~ location. T 16~. ~ 3 ~i.~ Fish Cree~ No. i2=8, Union Oil ~mpany, ~chora~e 0~69, ~ sect[ov- f;. Elevation 165'~. Novi~ in reg. T___7 N P. 9 W S~andazd Oil C~pany, S~ 14-3 (23), ~cho=a~e 028997, S~~ section 3. Elevation 149' K.B. Spudded 6-16-61. Casin~: 11-3[4"-2002" 1350 sx., 7"-10,850'-1900 ax. T.D. 10,850 it. Selectively ~[orated 10,674-10,750'. 2-?/8" tb~ at 10,658~, IPF 432 BOPD, 87 ~~, 0.4% cut, ~/6~" choke, 36.4° ~ravity. SI tb~ p~essu~e 166~, c~pleted 8=2=61. T~ ~:~ R 9 ~ S*andard Oil C~pa~y, ~ 21-~ (24), Anchorage 028997, - -~ .-" - , Spudded 7=19-61. ~;~:~2~C~ o~ 4. Elevation 165 K.B. 2017~-12~0 sx. Ccrin~ a~ 10,505 it. - 25 Ancho~aSe 028996, T 7 N, ~ 9 ~ S*anda~d Oil C~pany, S~ 41 5 ( ), . . ,,. ~~ : ~ ' , Spudded 7-23=61. C~in~: ~tT~ section 5. Eleve~ion 206 ~83,-[200 sx. ~ps~ocked aC ~,8~0 It. ~d drill[nS a~ 10,892 ~. Il-lO Department of the Interior Geological Survey Conservation Division Branch of Oil and Oas Operations Alaska Region HONTHLY ENOINEBRIN~ REPORT July 1961 D$~cov~ries on Federal Leases One: A drill stem test of a gas sand at 5250 ft. on Unionls Sterling veil no. 23-15 indicates a gas discovery in this proposed unit area. Operator is presently completing the well. A flow of 6980 NCFFDva~ obtained during a test of the interval 5250t-5254~ (see veil operations section of this report for details). Unit Agr, e, ements The proposed Duktoth River Unit Agreement, submi~ted by Richfield Oil Corporation and comprising some 40,320 acres in the Cape Yakata&a area of the Gulf of Alaska, vas approved on July ll, 1961 by Actin~ Director Arthur A. Baker. Application for desi~nation of the ChaixHills Unit area, submitted by Standard Oil Company of California and comprising some 8~,815 acres in the Icy Bay area, ~ulf of Alaska, vas approved July 7, 1961 by Acting Director Arthur A. Baker. Application for designation of the Canoe Bay Unit area, submitted by Richfield Oil Corporation and comPrising some 6~,9~1 acres in the Pavloi Bay area of the Alaska Peninsula, vas approved July l&, 1961 by Acting Director Arthur A. Baker. Application for designation o~ the Fish Creek Unit area, submitted by Union Oil Company and comprising 35,167 acres in ~he Knik Arm area of the Cook Inlet, was approved July 28, 1961 by Acting Director Arthur A. Baker. Application for designation of the~hite River Unit area, submitted by Richfield Oil Corporation and comprising some 101,214 acres in the Cape Yakataga area oi the Gulf of Alaska, was received July 10, 1961 and transmitted to ~ashington on July 27, 1961. Developm,en~ Contracts Pan American Petroleum Corporation~s TolsonaArea Development Contract vas approved July 5, 1961 by John A. Carver, Assistant Secretary of the Inte~ior. The contract embraces some 615,788 acres and is desi~nated 14-08o0001-7523. ? f i WELL OPRRATIONS (As of July 31: 1961) COPPER RIVER MERIDIAN T 20 S~ .R 15- E Duktoth River Unit No. l, Richfield Oil Corporation, Anchora§e 018920, SEk section 24. Elev. 60' K.B. Spudded 4/11/61. Casing: 13-3/8" @ 1002' w/1000 sx., ?" @ 6700' w/905 sx. T,D. 10,390' PBTD 6700'. Testing upper gas sands. T 22 S, R 25 E Chaix Hills No. 1, Standard Oil Company of California, Anchorage 02~567, SW% section 4. Elev. 1500' +. Preparing to move onto location. T.. 29 .S~ R 36 E Core Hole No. 2, Colorado Oil and Gas Corporation, Anchora§e 025270, SE~ section 28. Elev. 28' K.B. Spudded 6/26/61. Casing: 13-3/8" @ 45' w/120 sx., 7-5/8" @ 559' w/135 sx. T.D. 5690 ft. P & A 7/21/61. T..31 S~. R 39. E Core Hole No. 3, Colorado Oil and Gas Corporation, section 6. Moving in rig. SEWARD }.~,RIDIAN T 7 ND ,R ,78 W Napatuk Creek No. I, Pan American Petroleum Corporation, Fairbanks. 018048, SW% section 34. Elev. 54' grd. Spudded 3/20/61. Casing: 13-3/8" @ 1990' w/800 sx., 9-5/8" @ 5859' w/850 sx. Present depth 14,255 ft. Fishing for D.P. and collars @ 13,801 ft. T 18 N, R 3 W Rosette No. 4 (redrill), Anchorage Oil and Gas Development, Inc., Anchorage 019332, NW% section 21. Elev. 318' K.B. O~tginal hole spudded Au§ust 1959 and 13-3/8" csg. set @ 301' w/lO0 sx. Operations suspended October 1959 @ T.D. of 1624 ft. Re-entered June 1961, cleaned out to 1627' and 5-1/2" csg. set @ i627' w/310 sx. Operations suspended prior to perforating and testing. T 18 N, R 3 W Rosetta No. 4-A, Anchorage 0il and Gas Development, Inc., Anchorage 019332, NW~ section 21. Elev.' 317' §rd. Spudded July !2, 1961. Casing: 8-5/8" @ 406' w/180 sx. Present depth 1549', mixing mud to kill salt water flow encountered at 1535 ft. ~ 5. N~ R 10 W Sterling No. 23-15 (1), Union Oil Company, Anchorage 028135, SW~ section 15. Elev. 221' K.B. Spudded 5/5/61. Casin~: 13-3/8" @ 2227' w/1600 sx. T.D. 14,832 ft. P.B. and 7" csg. set @ 8388' w/750 sx. Testing upper ~as sands. On July 27 a two hour drill s£em test @ 5250'- 5254' flowed methane gas aC rate of 6980 MCFPD with 5/8" bottom choke and 1" surface choke. Flowing pressure 575#. Initial 30 min. shut-in 2195~. Operator now completing well. 1I-8 Department of the Interior ~eological Survey Conservation Divis ion Branch of Oil and Gas Operations Alaska Region 0ctobar 1961 Z. Am N, S, A, TXVE' .,, .GU ToR Disc0..veri~.o _on Unit Richfield's Canoe Bay Unit, comprising so~e 66,316 acres in the Pavlof Bay area of the Alaska Peninsula, was approved October 6~ 1961 by Acting Director R. H. Lyddan and desisnated ~1~-08-0001-7777. Richfield's ~nite River Unica. comprisins some 101~21~ acres in the Cape Yaks- raga area of the Gulf of Alaska, vas approved October 13, 1961 by Acting Di- rector R. H. Lyddan and dasisuated #1&-08-0001o7782. Richfield~s Berin~ River Unit, comprising soma $~,122 acres in the ltatalla- Yakataga area o£. the Gul~ of Alaska~ vas'approved O~tober l?~ 1961 bF Director T. B. l/Glen and desisnated Standard Oil Co~pany of California's Chaix Hills Unit~ containing approximately 82,326 acres in the Icy Bay area of the Oulf o~ Alaska, was approved October 1961 by Acttn~ Director R. 1t. Lyddan and desisnated #1&-08-0001-7783. Standard Otl Company of California's proposed Anchor River Unit agreement vas received October 2, 1961. 'Processing of ~his asreement has been suspended pending receipt of additional consent and Joinder inscr~_~ncso Cheese of des isnat ion of Operator of the Iniskin Unit was approved October 19, 1961 by Acting Director R. H. Lyddan. Belco Petroleum Corpora~ion replaces Iniakin Unit Operator~ Inc., as operator. This unit has been inactive, throush a number of extensions on drillin$ commitments, since December 1959. Belco be- gan operations September 2&, 1961 and is currently testin~ one of the old wells drilled by the previous operator. A preliminary £orm of the proposed ~est Fork Unit was filed by Halbouty Oil Company on September 25, 1961 and forwarded to Washington October 20, 1961. Wildcats Abandoned Five wildcat wells were abandoned and one other was preparing to abandon at the end of the month. Pan American Petroleum Company completed P & A operations on the Napatuk Creek ~1 in the Bethel Area on October 7, 1961. The well bottomed aC 14,901' with no oil or gas shows and was abandoned after an extensive fishing Job ended in failure. Union's FishCreek ~12-8 bottomed in possible Jurrasic volcanics at a depth of 6418' in the EnikArmDevelopment Contract area (& pro- posed Fish Creek Unit). Pure Oil Company's Canoe Bay #1 bottomed without oil or gas shows at a depth of 6642 feet. This is the first well withinRlchfield's Canoe Bay Unit, near the southern extremities of the Alaska Peninsula. Hacks- thorn Drilling Company abandoned its Rosette 4-A at 240?' after encounterin~ salt water and slisht amounts of methane on several tests. This well is in the Houston area approximately 35 miles north of Anchorase. Richfield abandoned its White River Unit #1 well October 31, 1961, after reachin~ a depth of ?982' with- out commercial shows of oil or ~as. Richfield has had similar misfortune on their Bering River Unit well and is preparing to abandon this test. Both of Richfield's tests are located in the Katalla-Yakataga area on the Gulf of Alaska. St~andard' s Refinery Site Chos~n Standard Oil Company of California purchased 481 acres of State land in Section 16, T. 7 N., R. 12 W., Seward Heridian, adjacent to the Kenai Pipeline terminal at Nikiski, Eanai Peninsula for a refinery site. Sale price was $250,000. Geophysical Work in Alaska (aa of .the end .of October) Oil Companies Geophysics.! Company_ .A_rea Standard Oil Co. of California Western Geophysical Suaitna Basin Palmer Area Richfield Oil Corp. Independent Exploration Gulf of Alaska - Yakataga Area Union - Ohio United Geophysical Copper River Basin - Lake Louise Road Pure Oil Co. Western Geophysical Nushagak Bay area Pan American Unknown Bethel-Kipnuk area II-1 T. 12 N. ~ R. 12 W~ ~ Stedatna Creek #1, Pan American Petroleum Corporation, ~tate lease ADL 03197, SE%, Section 30. Elevation unknown. Building roads and location. T. 18 N. ~ R. 3 W. ~. Rosette 4-A, Hackathorn Drilling Company, (Anchorage Gas ~-Oil Development, Inc.) Anchorage 019332, ~%, Section 21. Elevation 317' Grd. Spudded 7/12/61. Casing: 8-5/8" @ 406' w/180 sx; 5-1/2" @ 2392' w/450 sx, T.D. 2407'. Perforated and tested intervals from 2155-2235 feet and 2065-2080 feet. Recovered flowing salt water with a trace of gas. Squeeze cemented per- foratt°n & P & A 10/12/61. T~ 4 s. ~ R. 11 W. ~ Anchor River #1, Standard Oil Company of California, Anch- orage 028447, S~, Section 20. Elevation 1465'+. Building roads and location. T. 16 N. ~ R. 3 W., Fish Creek #12-8(1), Union Oil Company, Anchorage 022769, NW%, Section 8. Elevation 141' K.B. Spudded 9/3/61. Casing: 11-3/4" @ 1110' w/840 sx. T.D. 6418' in igneous rock (cored). No commercial shows of oil or gas. P & A 10/2/61. T. 54 S. ~.R. 78 w., Canoe Bay #1, Pure Oil Company (sub-operator for Richfield ~)~1 Corporation), Anchorage 052254, NE%, Section 8. Elevation 140' K.B. Spudded 8/26/61. Casing: 24" @ 27'; 13-3/8" @ 518' w/398 sx. T.D. 6642'. P & A 10/26/61. T. 5 N. ~ R. 23 W., Zappa #1, (redrill) Belco Petroleum Corporation, Anchorage 010531, NE%, Section 18. Elevation 330' K.B. T.D. 11,231', PB 8528'. Casing: 13-3/8" @ 3~' w/690 sx. Perforating & retesting various zones. Gas too small to measure. SOLDOTNA 'CP. EEK UNIT. T. 7 N..~ R. 9 W.~ Standard Oil Company, SCU 21-4(25), Anchorage 028997, Section 4. Elevation 165' K.B. Spudded 7/19/61. Casin~: 11-3/4" ~ 2017' w/1250 sxl ?" ~ 10,700' w/220 sx in 2 sta~es. T.D. 10,896, PB 10,688 (top of fish in hole ~ 10~?03). Preparin~ to complete. T. 7 N.~ R. 9 W..~ S~andard Oil Company, S~ 34-5(27), Anchorage 028996, S~ction 5.' Elevation 153' K.B. Spudded 8/9/61. ~sin~: 11-3/~" ~ 1650~ w/1200 sx; 7"~ 11~216' w/1800 sx in 2 sta~es. T.D. 11,220 feet. Selectively perfor- ated 10~330-.10,479'i 2-7/8" tbs. ~ 10~641'. I~; ~22 BOPD~ 100 M~PD, 0.8% cut on 8/6~" choke, 37.4° ~ravity. TbS. pressure 1525#. Completed 10/9/61. T. 7 N..~ R. 9 W., Standard Oil Company~ SCU 34-9(28), Anchorage 028997~ {ecg'ion 9. Elevation 148' K.B. Spudded 9/25/61. Casin~: 11-3/~" ~ 2001' w/ 1365 sx. T.D. 11,038 feet. Preparin~ to complete. SWANSON RIVER UNIT T. 8 N. ~ R. 9 %~. ~ Standard Oil Company, SRU 43-15(23), Anchorage 028384, NEkSEk, Se&tion 15. Elevation 335' K.B. Spudded 7/16/61. Casing: 11-3/4" @ 3021' 11-9 October 12, I~&X I mn ~n receLpt of your !fo.~/¢e, d~t~ed October 9, 1961, of in~eution to ~~ ~ ~I1 ~. ~e~t~ ~ Sec- 21, T.I~.,R.~., ~~ B & H. c~nt pl~ mt Z,9~ Y~e v~ DDB:bb cc: 1~ a. Soyster Donald D. Bruee (:hief, FetroleumBrauch For~n ~-381a (Feb. ? (SIlBMIT IN TRIPLICATE) UNITED STATES DEPARTMENT OF THE INTERIOR GEOLOG lc:AL SURVEY Budget Bureau No. 42-11358.4. Approval expires 12-31-60. Land Ofllc. --~~ ...... 01933~ Lease No .............................. u~t ............. LL_LJ .......... J,L_~ SUNDRY NOTICES AND REPORTS ON WELLS ~o~,~ o~ ,~,o~ ~o ~ ~,~ ............................. II ~u.~u~ ~o~ o~ ~,~ o~ ~,.z,~ ................ / ..... NOTICE OF IN~NTION TO TEST WATER SHUTOFF ................... -[1 SUBSEQUENT REPORT OF AL~RING CASING ...................... -[ ..... NOTICE OF INTENTION TO RE-DRILL OR REPAIR W~L .............. _~ SU~EQUENT RE~RT OF RE-DRILLING OR REPAIR ............... -~' ..... NOTICE OF INTENTION TO SHOOT OR ACIDlZE ....................... _~ SUBSEQUENT RE~RT OF ABANDONMENT ......................... -~ ..... ...... SUPPLEMENTARY WELL HISTORY ......................................... NOTICE OF INTENTION T~~L ................................................................................. : .......... (INDICATE ABOVE BY CHECK MARK NATURE OF REPORT, NOTICE, OR OTHER DATA) 0,~~ 9. 19~1 Well No. --&~t~ ........... is located __~- ft. from__ line and ___:~l&__ ft. from sec. ~l~ 1~I~,__~.¢..--~- ............... : '~__!~____ L__ $___~_ ................ ~d .............. .... (~-Me. an~t Sec. No.) (Twp.) (Range) (Meridian) ..... .................... ............... .............. The elevation of the derrick floor above sea level is $_;1~ ....... ft. DETAILS OF WORK (State names of and expected depths to objective sands; show sizes, welghts,;and lengths of proposed casings; indicate mudding jobs, cement~ lng points, and all other important proposal work) I understand that this plan of work must receive approval in writing by the Geological Survey before operations may be commencod. Company ....... ~-~~--~ ................................................................................. Title ..... ~~--~'-*-;- ................................... GPO O~tO40 Forxn ~-381a (Feb. 11)51) (SUBMIT IN TRIPLICATE) UNITED STATES DEPARTMENT OF THE INTERIOR GEOLOGlCAL SURVEY Budg~ Bureau No. 42-R~.4. Approval expires 12-31-60. l~nd Ofllc. ~~ No .............................. ................................... SUNDRY NOTICES AND REPORTS ON NOTICE OF INTENTION TO DRILL ................................. I ...... ]1 SUBSEQUENT REPORT OF WATER SHUT-OFF ....................... I NOT,CE o~ ,NTE,,,ON TO TE~ WATER SHUT~F~ .............. I ...... Il suBsE~UEN~ REPORT OS ALTE~iN~ c~,.~ ....................... I ..... .o~,~E o~,.~.~,o. ~o ~.oo~ o..~,~,~ .................. ] ...... II ~=~.~.~.~ o~.~..~.~.~ .......................... / ..... .o~,~' o~ ,.~.~,o. ~o P~ o. ~. ~,.~ .............. ~ ...... II ~P~.~.~ ~E~ .,~o.~ .................................... I ..... ' '' ' '' ' · i/ .................................. (INDICATE ABOVE BY CHECK MARK NATURE OF REPORT, NOTICE, OR OTHER DATA) Well No ...... ~ ...... is located ___~_ ft. from__ line and__~ .... ft: from {~] line of sec ..... _~_~___ ........ ~tij~e~a~ ......................... ~4-~-D-~~---(County or Subdivision> (Meridian) (State or ~errit0ry) The elevation of the derrick floor above sea level is .... 3_~__ ft. ,, DETAILS OF WORK (State names of and expected depths to objective ~ands; show sizes, welghts,;and lengths of proposed c~sings; indicate mudding jobs, c~ment~ lng points, and all other important proposed work) I understand that this plan of work must receive approval in writing by the Geological Survey before oporations may be commencod. Title .... ~ ................................... GPO l! I040 Septetnber 8, 1961 Mr. b'Xlltsm D. Folta, Geolo$ist Ba~mthorn DrilliJ~g C~lp~ Anchorage, Alssk~ Z am ~n raceipt o£ you~ Ifot~e of ~nteut~on to Cha~e ~lmas, d~ted ~~ $~ 1961, which atJte, so f~ollovl= UFreoent Depth: ~7 ft. ~- ~f,u8: 406 feet 8-$~8" ourfW eesXn8 cemented ~ 175 ~ of ~~t~ 2. ~ 2392 tt of ~ ~ S-X/2" ~~ ~ ~t wl~ 450 ~cb of ~~~ cmt. 3. ~ ~t~ ~ ~ ~t~ly perf~ate attr~tX~ 8~s ~ test ~ p~ti~. ~. ~~te ~, Lf ~c~l." please be advf~ed ~hat the p~aX Ls approved provXded, however, chat a test o£ the' 5~' ':~ter shut-off shall be made throush sun perforations above the hf. shelt~ttsfid Chat Xs tO be open to produet~. Yours very truly, Donald D. Bruce Chief, Petroleum Branch Forth ! ! ! ! ! ! (SUBMIT IN TRIPLICATE) UNITED STATES DEPARTMENT OF' THE INTERIOR GEOLOG lC:AL SURVEY Budget Bureau No. 42--Hi~8.4. Approval expires 12-31--60. L, nd O~e. .... 019332 Lease No ....... Unit ........... SUNDRY NOTICES AND REPORTS ON ~-'"L~i..~ ' '' ''':'~'~ NOTICE OF INTENTION TO DRILL ................................. NOTICE OF INTENTION TO CHANGE PLANS ....................... NOTICE OF INTENTION TO TEST WATER SHUT-OFF .............. NOTICE OF INTENTION TO RE-DRILL OR REPAIR WELL ......... NOTICE OF INTENTION TO SHOOT OR ACIDIZE .................. NOTICE OF INTENTION TO PULL OR ALTER CASING .............. NOTICE OF INTENTION TO ABANDON WELL ...................... ._:~:__ll SUBSEQUENT RE~ORT OE WATER SHUT-O~ ....................... ..... q~ SUBSEQUENT REPORT OF AL~RING C~ING ....................... ..... -II SUBSEQUENT RE~RT OF RE-DRILLING OR REPAIR ................ ..... _1~ SUBSEQUENT REPORT OF ABANDONMENT .......................... ..... ~~~ SUPPLEMENTARY WELL HISTORY .................................... ; ....................... ~ .................................. (INDICATE ABOVE BY CHECK MARK NATURE OF REPORT, NOTICE, OR OTHER DATA) '_ ...................... ~_e~_t~tber___~_. .................... ,19~_ Well No. ___~__~e5 ...... is located __~7_~_ ft. from__ line and __4~___~ ..... ft. from line of sec ..... ~.1~__. ' ---: ....... ~ ....... ...................................~a%~ .... .......... ~-~Tc. ~: ~.) ...... (TWP.) (R~ge) ......... i~ga-~c~5 ..... .......... - ............. = ............................ .................. ~1~) (Oount7 or The elevation of the derrick floor above ,e~ level is ___3_~_-- ft. DETAI~ OF WORK: (State names o~ and exacted depths to objective sands~ show si~s, ~ei~hts;;and len~th~ o~ p~opo~ ca~in~l lndt~te muddinl job~, ~menN in~ polnt~, and all othe~ impov~nt pvopo~ work) ~resen~ ~ept~: 2407 ~. Cas~ng~ 406 ~eet a-~/~ s~'~ace ~as~ng c~ente~ ~ith 175 a~c~a ~ co~ruct~on tempt. ~e u~ pr~ose ~0 t~t ~e we~ in ~he ~ot~n~ nanner~ 450 s~'o~ construction cem~t. 3. ~ ~u~r~ ~ ~ select,ye Y per,orate attractive sands and ~-ea~ ~or protozoa. · ..... ~ _ .L_ ~__s--ical ~urv-~ before operations may be commenced. understand that this plan o~ work must recmve approva, in writing ~y Ln. ~--~.~s ~- ~mpan7 ~~~--~~-~--~~-~ .......... ~ .................................................. Denver 2, ~10r~o By :Wl!~_~_~ii---~T--p-~i-i-i-:--, ...... :::::- ........................ ~--; .... &-wz- ....... ~ .... _= ...... .;-; ......; ..... Tit]~ _~.a~t$_~ .................................... ........................................................................ .,.. O~ tit040 HACKATHORN DRI LLI NG COMPANY 715 Midland Savings Bldg. Denver 2, Colorado Alaska Dept. o~ Natuzal ~ic:~ou~ces May 29, 1961 Alaska Division of Mines & Minerals Petroleum Department 329 Second Avenue Anchorage, Alaska Attn.: Donald D. Bruce Dear Mr. Bruce: I wish to submit an application to deepen the Rosetta No. 4 wildcat well, located in the SW ¼ of the NW ¼ of Section 21, T 18 N, R 3 W, Seward Meridian, Alaska. A completed application form which has been duly authorized is enclosed. In addition, an Electric Log of the Rosetta No. 4 well, and a Halliburton invoice pertaining to the cementing job of the surface casing are enclosed with this application. I trust you will find everything in proper order. Respectfully yours, William D. Folta General Manager cc. File WDF:gt .r :,,::,~ 'T D~/LL D~-EpEN OR PLUG BACK APPLICATION FOR Pi~i~it O' ,' NAME OF :~'~pANy ~'~ o~R~:~0~ ~q~v .... : ~ ' - ' ': ..... : .... - .... - - DATE Address ::: ' -:-- ' , - '-:- --~-- ~ ,: -.- . . - C1 y "..- .... : :- :..' - -:':?:'"" '~0-:~::': :::-:~JS~RiP~ION 'OF-WELL'-tN~' ~EASE ' Name of lease %Veil location (give footage from se~ion lines) Sect:on--townslnp--range or block & suvve~ . Distance, in miles, and direction from nearest town' or post office Nearest~st~m propo~locatlon to property or lease line: ._ ~, feet · ProPosed depth:_ -'<'<'" J Ro~ or cable tools ~'I~ lease, purchased with ono or more Distance from proposed location to nearest drilling, completed or applied--for well on the same lease: / ..1'=.,, 1_ Number of wells on lease~i~i~di~Zth~e~. completed in or drilling to this r~ervotr: Name Wells drilled, from whom purchased: Address ~ Ave.~ Aide, Alalka Status of bond Remarks: (If this is an application to deepen or plug back, briefly desckibe work to be done, giving present producing zone and expected new producing zone) .,, ~Y P~9 !96! .~ t~ ~ ~ t~ ~,~ f~t.' -..~ ~, ( · ~ , , 1S CERTIFICATE: I, the undersigned, state that (company), and that I ~ author~ed by said company to make ~ report; and that this report was pre- pared ~der my d~e~ision and ~ection ~d that the facts stated thereto are true, correct and complete the best of my ~owledge. 'S~~ - ~ v ~ / - - - Approved By:' Notice: ~e~ore send~g ~ ~h~s ~Or~ besure-~a~ y'~' g' aH ~or~a~on requested. ~uch u~ecessary correspond- ence ~ thus be avoided. ~ee Instruction on Reverse ~de o~ ~or~ Alaska Off and Gas Conservation Commission Application to Drill, Deepen or Plug Back Form No. P-1 Authorized by Order No. I Effective October 1, 1958 a 0 0 a Form 9-aao LOCATE WELL CORRECTLY 10 Budget Bcrreau No. 41R3M.4. Approral expires 12-31-W. DEC 4 1911 U. S. LAND OrrlcE _ AnchOr g6 SRAL NUMBER 019332 JX1.5io11 9__ --Lo erg11 'U.S. GEOLOGICAL SURVEY LEASE OR PERMIT TO FROSPZUT Anchorage, Alaska UNITED STATES DEPARTMENT OF THE INTERIOR GEOLOGICAL SURVEY LOO OF OIL OR OAS WELL Company __ Hackathorn Dr i I I I ng ComP_g yAddress __ 134 _E. Second Avenue - --------- Lessor or Tract _019332 ___ ____ __ Field Wi idcat_____-_-__ _ State Alaska -------------------------- Well No. _ 4 "A.____ Sec. 2 I T 18 R. 3W___ Meridian __ Seward .............. ---___ County 3r--d----Jud i c i a I District ------------------------ Location 1876__ ft. 1 of _ ___ Line and 4 $5 f t. j of __ w__ Line of Sect i on _ 21________-_ Elevation 326 - R.S. The information given herewith is a complete and correct record of the well and all work done thereon so far as can be determined from all available records. 01 ,,,� Signed ---------- 6-4 - -- ---------------------------------------- Date --- li'Or/ ,t!4e �a_ / <�-------- Title------ ----------- The summary on this page is for the condition of the well at above date. Commenced drilling ........_ _ _ _ . Ju I y__ 1 2---------_-- 19_� __ Finished drilling ._October 7 - _____-----, 19-61-- -,u4.- I --------- b t scr,q 5 I r,8 1 OIL• OR GAS ,SANDS OR ZONES arc 4 o} c:ou24-t.nc.t - of (Denote gas by C) No. 1, from.!?�!_!r'to .__-_.___-__ ___ No. 4, from ---- ---- -------------------------- to ....... ------- ----------- 61QC9q Ca' b a --� Aj1iy y r 4} cclt'�Rt c(-�c�u cowati.. pA No. 2, from------------------------ _----------------__ No. 5, from ------------------------ to -------------------------- SSC LDDM --r -I_4- No. 3, from -------------------- --^oto ----------------------- No. 6, from ------------------------ to IMPORTANT WATER SANDS Imo" 50l Dnu.�h b�.ca?a....�• J�e,.d, : �! 35.1, s 11 ---- No:, ---- .-.ncc� i 1 hr ' h. r 1=u45U L F . No. 1, from _-r---�__„ _----1------------------ > 3, from --------------- •--------------=----- --- No. 2, from__---- dl,asaso� _r+to br ' ^t qL , no;,_ -1`No: 4, frons------------------------I� - S 1to� ,--SSS•1- -------------------- ----------------------- ;7anieIFE-A T -01 -TA -51 CASING RECORD Slee casing Weight per foot Threads per Inch slake Amount Bind orshoe Cut and pulled from p Perforated Ecom— To— Purpose p I-t�+ S „ z�frtt c �..ET `� , I py�ri-�;� zc z -.. ... E� Z4 q��y��r�!' r� :,per}u� rur _ tr.�t r� stefq' hoatliozr : 7Lr!, c!U x�,.: 1 ccR��,.' „ , a. + _ nfa -rilt�: n S cr_� owu��ac1l i'�' _r_ '(Q t1�F � `Y.r_�__::�s�c--:�s � ! t1i!f[��_rit irfr-c:t_IU3 iii _ _ _�_—.. ' 21tru .Fi1112' :ruu ri �.1 �q 711 --- - ---- ---------- ------------------ ,�sito ----=-------- ---------------- ---------------- - J,fr,� r. =e�ui•: gr," ----------------- jim q;ip '• zc;rir lmrll . ________-EM r nuc Z -n rZ r nu ---- -- �O tl �r r - -- �- ------ -------------- -- ---------- - -------------- ----------- -- - - - - -- - - I ------------ ---------------- -.. MUDDING AND CEMENTING RECORD size ex -sing _ala -- Whrtre act 6' - ---- - - - -_--.- Number aaelrs of cement \lethod used 11fud Amount or mud used 150 sacks __. -----„150 ----------- --------- P. --p---- A--P--Ns 9 ��a f- ' 1 2 2392 --450 n it ----------- r----- --„-------------- ----- 112 --- IQns-- (Appr_Qx.�---- PLUGS AND ADAPTERS Heaving plug—Material --„None_-- ------------ Length --- NOnDepth set-BQRQ------ .,-.----�.-._ Adanters—Matnrial------ None fii,p Mone ,ing Slee i Shell used Explosive used Quantity Date Depth shot Depth cleaned out n ---_�2 88 Shale, black 100 1$0 80 Sand, arkosic 180 350 �_ it ------- -__- _-------- ----------? �!— ^--------- ----,21------ --- $ -,9-=5-� ---2153-72-1-Ed-- --------- -__--------------------- and thin sands -----Q--------- -9=5=6.1---2174r-2 4-94-- Tofts us&? " Z"D_ZZ35 gois s Rotary tools were used from __S1tlrfats____ feet to 241Q7_------- feet, and from __------------ feet to ----------- feet Cable tools were used from _A94 ----------- feet to __------------ feet, and from _______________ feet to ---------- feet DATES ------------------------------------------, 19------ Put to producing -------Now-----------------------! 19 ------ The production for the first 24 hours was ------------ barrels of fluid of whiehwne__% was oil; noun -%a emulsion A9flk % waster; and 13im% sediment. Gravity, °B6. ----- tea ----------------------- If gas well, cu. ft. per 24 hodrs Gallons gasoline per 1,000 cu. ft. of gas _ 0-9no ___------ Rocl- pressure, Ibs. per sq. in. uaknoWA____- EA9LOYEES ----- _M --- B�_ ___.,____-__, Driller �___ _______-------------------------- Driller if e • �RMATiON RECORD FBOM— _W0_ FE TOTAL FEET FORMATION Surface 12 1? Coal 12 100 88 Shale, black 100 1$0 80 Sand, arkosic 180 350 i 170 Siltstone, soft, some coal stringers; Coal 335-350 350 i 500 ' 150 1 Shale, black, soft; some coal stringers and thin sands 500 '580 80 Siiltstone, black, hard; some coal : stringers and thin sands 580 ; 800 220 Shale, black, soft; some coal stringers and thin sands; chert. M 7I ,i.p.Xyl' Eif'L I hrlft'li'11,1�.,. LOYS!dV.L1014 iSl�.c 81&11---001T4: urrsq -- jTT LEI)` rR { I't:Y'L LIroal,ncL --------- ----------- 2f7LIy CS di a fl' :f it' pW L . 201MD C09tT 2N �7.g' •pl o t' � ��' .-IT s c>e;ziij� s:F Cos'7 332 -?2-' ct IjT r JA)--. �i...i • xy L[)i♦173�i3. FROM— TO - 800 j w 920 ' ' 920 1 9_90 990 41020 1 1020 1Ob0{ 1060 1140 1 140 1260 � � X60 • S'�3�0 1355 ' S1350 a �0 Si3�5 51.475 5475 Sh575 1575 1635 SOP2 51Q� 1535 1 IS1,11160 - 1950 FtSE}f}— I ILCi -~ _.----� ---- Driller ` - ----------------------- FORMATION RECORD TOTAL FEET FORMATION 120 i Sand, medium to slightly coarse grained; C081 stringers 70 Sand & limestone, glaucon'i-tic; Boa! stringers 30 Dolomite, white, hard; chart 40 Sand, silty, micaceous, subrounded to 1. subangular 80 Siitstone groan -gray, hard, minor mudstone 120 Sald 'me91Lm ra ad fair r i g; m1 c+r Cl �1ir r �, coal ani 3au qqn L. ,.s1 . J I Pone • cE�ert I ti90 j -S1 It toi a and °Saiid14 in+�ggraiiri'san`dG. li i rr L C' - '"1 1 v �Vf i Iaa glaucbh0;1-Tf c 15 !.S and, s j y, -,good f4preCce� a rci ,water an sredIla va Si18:1 a tstone, coil str!'ngers and Min sands; _and, fine t? medium ,grain, ,f ar.•d, tight 1�0 an yrhifie, Vine t6i' 'I;�m`gr�i'n, vL?V` rsidn_eco AIXCRU c mei SUD— f�7i�� 60 5 i l t'sto a and ShC l ` '�?' "ik(' `' �} u'Sa�s� 1 T'' j Loi u cc • rt 1 �� ah a_c, !(c hat ail i IOG �,eL,�Im er IgI0 1625 , #ine grain brandeduseK yea .0 �� + Us i�Llqs' d lull iC r$� i Ci7L�Q 6JC>'rr}gr1� 125 Sand � �J.,Ifip,Wmedleumgrain, glauconitic; cl�r some 1 1 gr�� to coa I sr i.nger # 1 1 14 ��- s•.QVU-. 1(1L'ra' }};};•}, � Efil�7ii-Lite! i�.OdSTPIFi.I.iC3L! K�°��KD---C��lxrrr;sr� -- ---- --- Ie-�.•,ar;-s j � I L5 ��FII�1' f i .`iltL'jj •___ ._�___ __ __________ i Farm s-aao FILOM— �! TO - 1760 l6zoo 2065 21W 2202 2229 2140 1030 aao d� 1820 206-9 2165 141?� 22W 2tW 2340 I?2? 24W T.D. 3 Sg€'i i0QD i fl3C dd0 daC -i-fu-------- (:rr rLIrVa1,'011 0;k'i4ian _ ,.,..r r,r•Ts L T 'WRVEY FORMATION PU; D—C TOTAL FEET .e 245 100 m 37:) 27� 670 1 S 90 ]t7 07C LD�SFhT'd3.' �5---•--.•-,�.:-----:---------- _-- __---' F37?l�blC Nln{w, r uriL ;a r'tht?ttm1JCZ`..:r� -zs iriuq lr 2rgJ [ ti6 F)r. '+i:C(TiiIJ FCIL ;PG ffL24 .)-= FU]rI.2 ILUP ------- ----- ------------------- _-----t--- (iS) f':1t; T71)�a 1Lli l f 21,i,f �I.Qa i -'4J j ---------- Titl Ula j'U+JT? h 7J.F, 11. 'q ,.;'01ZI ' - �� ---------------- ----fir PQ] rias:+] gzl uYlrr:Infol +1iv 2HOO.L Budget Bureau No. 42-8355.4. Approval aspire412-31-60. U. S. LANA 011'nC34__Anchorage SERIAL NU111HEJ3332--.—.— T—.-- ,,., P„n. mn Pnnooc.rnn FORKATION P W -t I A-i-fU!\ i I tstogm, , gr gray, ba ds.:, t1D jp, 3S I rggers o hbi6t ,as 4 rt.+it aru u' a prxcorJ ;ani benon7 c chert carbongto convent ,andi J dar roans orkos c�, fine ° �UoprbT s�, r0 pjgd jo std 21 Ilan I I sr� g oros ry n11 permeab i a 1�yo lli�ow, f J uorascence 215-216 aJ D _ conglomerate hard, ght; grra"nT+ swash�,s t ., ! t chart arltAO { {1 iia aA' ire ocke con Romer o, green, hand, t ght +r and, , w1 a, , su�iroun oto subangu i� god J.porosi y and per- ability; acdasional ,w L4 ! L fl oroscence in ,samplesa i reywoRe counghlomrrate and sao• xrare r nide w ' occapioi fluorescencw A same j OS UL 31 UVtj }t.+ J L eQL.., ; UU . is [ JOL c i �• �w ' t3i_8ar�,.['�= st..° IJgL4 ` J � �� tlJrxq a�a{�e enp51uan iSiL 2i;uq-' a 1 i lr1' w:,cscl;ana' anpLonugaq 4.0 DOII? Wtl.01 AP14.0` P9Lq: CPGLa. zsuq -r 1- t iwa_�ow, a 1 sr!cctJ 1 + I c' C091 ?4.L i uaaL e rSg;l a,�L 1 u2Qt. a 2sRuq' W*q ! rat ..n 21 !8p11 A COgL20 88',9 l laeq' - - - ----,.�— ------ ------ --- - --- T)1;i :.f - .r t'u! Moira 3tM0jtlFs bG j'OJ7fi G;3 { ' of ?,',12 _ }33�?------- ---- --•--^ - putj'Gp u1 Urn g i?} rLplc}S tF�F;a- c,, 1: ;J,t 011' tJ11i3c ra ZJi� '{o Dr.!1{jF{GTIIu ---- - U.i----------------------- --------------- - -- - - - - -- --------------- 16rf---------- 1r.f 4C ------•---- -rf�---------- -------------------------- -------�,fCt+w'- i. t[Ci�r tJii: l� ------------- ._..----'--- QC KECOBD jl Y.i tv;tr!i i r:i} h�. �.. `�.I' ri I of •{ r ..i ..:,. -... ............. -- :Icy I s'1'C I ,J74L1 /C7 I- - -frr�s�+r..4.Y'41frt;x.{!� f'.tM vic' it rD s :. --------------------- 4�11'gr!.4rf? 4tr=7TstiJNL { {url+nUreruru 11 jlru'; ;ir'1'1F;1%vC11:C; FSECbI;SI� U. I- COMArrwr PnNTiNS orrree HISTORY ' OF OIL OR GAS WELL It Is of the greatest Importance to have a complete history of the well. Please state In detail the dates of redrilling, together with fhe Feal;ong for the wor$ "and ii* exults. If fhese werei'fiy 1 hanges made In the casing, state fully, and it any eatiing wab', I u d "stdelracked" or left in the �1[eil, glv it size end dtw ation.- -If t eell has been dynamited, giv A te, size, position, a0-.nlimbq of shots. If-p�lags or bridges -were pu 'in -to test for•wafer, state' nd'of material used, position, and tiesults of pumping or bailing. !' �r'iti}a0 r.Rry•!�y bc4 #T '. 'f+y+}cilu� E12JQ„(rlVL k911 r7;7€q SLUM hIFL A 5_ebtembee 26. 1961 Squeezed ofirr' perforaFions at 21-55' �`''I '�65'; 2174' - 2641;'2225' 2225' - 2235'. ' , • P1 gced comerlt F'1 ulig -at 21 14.5Cp w i t¢,o100 it a cksof construction cAfent" and 1540 psi pump pressurs,L) .# AAV.XUU 2V U)2 WVber 7. Iga------------------- Placed cement plug at 1975' wiA 15 sacks of construction cement by X40. F` pump and pltig.(11 i�� - - - - -• Placed plug in top of& 5-#/2P ';"JngF.wj WO sacks of construction cement. irUk I I: ]'-! !; it - ,{ -- I 'r it 1.11- _ .- - -- - ----- - - :l ..1l ,D ' i : DIP N ,6 .r' I 7.ix1, �3E) I1I';: r.;rl'_ .{ ;�.-T,"'r,iUPj- rir"V :l F.[�.::. ! ,:I :, ' f I +tAP r r5 ,i. .[- F f r t..l! ' * +. r 'i:l , d r I.T CC .d:{ki. f},' -j!n tL{ ff 71;rj 1'11 +• {f�: , i; . ] I -- ITV1�C,err� '.� .'�....__"�sFri,+.;ff�P r+ � 13A+3�r+tly�"4q �!t^rc?9i [1M•°Eq-'',� 1::. U.'4 '--�---•--•'-v, - - - --- - -- - - of ----- ,-------- .i.� I{rfc�J>��5��@ f1 I � :'� .: 1(: � ��t{ l=r"'. p. � :j�Lu DL ! i i .......•-- rrr_d r,F?'J F 1 1.. " i; 1-1 1 -!c _ _.w Me OE 1Y oil F - -corceicvr 2F16AEA I � 1DL1uV16.L EA_L OL _LHE i .4 -LE )OL a.- -- — mil -LED 21V4Ea 1 I I + {. - f i °_`�• F �!;}.}f'� �!:'fi.: t.. !fF ,_ii.L x' ��:i{`r.. w� " -- � TFC.""� _. "" .,� � •s' i f iF,jtl'7r f : f::,F_d; &FUa ---' 1,1141x7 $'.:',"!} r. .1� ,•, Y d.`l .. J =M r Pbrns. s -Sala (Feb. 1961) (SUBMIT IN TRIPLICATE) UNITED STATES DEPARTMENT OF THE INTERIOR GEOLOGICAL SURVEY Badu Bureau No, 44--113si;A. Approval expltrs 12 -3t -M. Lnd OIBee ----------- e ----- 1ia.sa Wo. ----019332 -------------- Unit ...... SUNDRY NOTICES AND REPORTS ON WELLS NOTICE OF INTENTION TO DRILL ----------------- --. __-____- _____. SUBSEQUENT REPORT OF WATER SHUT-OFF----------------------- ----- NOTICE OF INTENTION TO CHANGE PLANS ---------------------- ------ SUBSEQUENT REPORT OF SHOOTING OR ACIDIZING.__.-....... �_ at------------------------- NOTICE OF INTENTION TO TEST WATER SHUT-OFF ------- — ---- ------ SUBSEQUENT REPORT OF ALTERING CASING ----------------- —..-__. (County or eubdivulon) (Biate or Territory) NOTICE OF INTENTION TO RE -DRILL OR REPAIR WELT---------- ------ SUBSEQUENT REPORT OF RE -DRILLING OR REPAIR...,..__-_ NOTICE OF INTENTION TO SHOOT OR ACIDIZE........................ SUBSEQUENT REPORT OF ABANDONMENT -------------- .------- — ----- NOTICE OF INTENTION TO PULL OR ALTER CASING-_._...__-__ SUPPLEMENTARY WELL HISTORY NOTICE OF INTENTION TOSARJ CELL__________________ --- ..__---- _____......................... (INDICATE A13OVE BY CHECK MARK NATURE OF REPORT. NOTICE, OR OTHER DATA) 0 `-- October 9, 61 --------------------------------------------------________ r -I Rosetta o /el} No. _...4A___.._-_-__ is located _1875-. ft. from__ j..Nj line and .._486_.. ft. from IF} line of sec. ..21, e. g DETAILS OF WORK � State names of and es g g p 1 = ..{ W ( expected depths to objaetive .ands; siygw sixes. wei hta�and lengths of ro Deed casings indicate muddin job.. caman4. Ing point +, and all other important proposed work to 4 Present Depth: 2407 feet Casing: 406 ft. 8 5/8 in. surface casing cemented with 175 sacks >♦ of construction cement. 2392 ft. 14 lb. 3 55 5� in. casing cemented with 450 sacks of construction cement. o Perforated Intervals: WSO 19901-1-9911; 21051-21061; No water entry (2 holes/ft.) ao 20681-20731 (4 holes/ft.) Flowed salt water. U We propose to aqueeze cement the perforated intervals with 50 sacks of a m construction cement, and set a cement plug from 19401=19901. Another cement ��a plug will be set in the top 40 ft. of the 5'k in. casing with 5 sacks of construction Dtn cament. We are suspending fusther testing operations on this well at this time. D 1 understand that this plan of work must receive approval In writing by the C.olo=ical Eurvey before operav slriay be commenced. Company _-_ ____Hack athQrn__Dri11in;__Go pmV_ ..-- - - Address 715 Midland Savings Building Deriver 2, Colorado --------------- cc. Alaska Division of Mines & Minerals ------- -------------- ----- ------- oa_ _12 -1961- U.S. GEO ^ECAC SURVEY By ' / eMeiail .nae h1:?aka Title ----.Geologist aro 641340 LISW/4 NW/4. Sec.- 21 _____ - ---- 18 N 3 W -_ Seward -------------------------------- - (%Bee. ani Sec. No.)- ________ _ -------------- - (TwP•) (Ranco) (Dterldlan) at------------------------- -Thir_d .iu.dicial.-District-- ---- --- ---- &lasks....--------- \` r0 (Field) (County or eubdivulon) (Biate or Territory) 7 The elevation of the derrick floor above sea level is 326..--.. ft. >y e. g DETAILS OF WORK � State names of and es g g p 1 = ..{ W ( expected depths to objaetive .ands; siygw sixes. wei hta�and lengths of ro Deed casings indicate muddin job.. caman4. Ing point +, and all other important proposed work to 4 Present Depth: 2407 feet Casing: 406 ft. 8 5/8 in. surface casing cemented with 175 sacks >♦ of construction cement. 2392 ft. 14 lb. 3 55 5� in. casing cemented with 450 sacks of construction cement. o Perforated Intervals: WSO 19901-1-9911; 21051-21061; No water entry (2 holes/ft.) ao 20681-20731 (4 holes/ft.) Flowed salt water. U We propose to aqueeze cement the perforated intervals with 50 sacks of a m construction cement, and set a cement plug from 19401=19901. Another cement ��a plug will be set in the top 40 ft. of the 5'k in. casing with 5 sacks of construction Dtn cament. We are suspending fusther testing operations on this well at this time. D 1 understand that this plan of work must receive approval In writing by the C.olo=ical Eurvey before operav slriay be commenced. Company _-_ ____Hack athQrn__Dri11in;__Go pmV_ ..-- - - Address 715 Midland Savings Building Deriver 2, Colorado --------------- cc. Alaska Division of Mines & Minerals ------- -------------- ----- ------- oa_ _12 -1961- U.S. GEO ^ECAC SURVEY By ' / eMeiail .nae h1:?aka Title ----.Geologist aro 641340 Company Hackathorn Drilling Company I Location Well No. Rosetta # 4 Lease No. 019332 Your proposed plan of E%" is approved subject to the following conditions: 1. Compliance with Federal Oil and Gas Operating Regulations. 2. Changes in the approved program must receive prior approval of the Regional Oil & Gas Supervisor. 3. Oil or gas zones either previously productive or correlated with productive zones must be protected by adequate cement plugs. 4. That portion of the hole not occupied by cement plugs shall be filled with heavy mud fluid. The top of the hole shall not be closed until the Supervisor has been given an opportunity to inspect it. S. AAM wells shall be marked with permanent markers consisting of a pipe not less than 4 inches in diameter and not less than 10 feet in length, of which 4 feet shall be above the general ground level and the remainder embedded in concrete. The top of the pipe shall be closed with a cap or cement plug and the marker should show in a permanent manner the name of operator, well number and location. b. Equipment and valuable material shall be removed from the well site or dismantled and arranged in an orderly manner; junk and debris shall be removed or destroyed; pits and cellars shall be filled and leveled and the well site, including sumps, shall be placed in a clean and orderly condition. 7. The hole should be converted to a fresh water well if possible and practical. Suspension 8. A subsequent Report of XEvRdntwunE, Form 9-331x, giving a detailed account of all abandonment work performed, including location of cement plugs, casing pulled, casing left in the well, date of placing surface plug or cap, shall be filed in triplicate, within fifteen days after completion of the work and the Supervisor shall be notified when the well site has been cleaned up and is ready for inspection. Mailing Address Regional Oil & Gas Supervisor U. S. Geological Survey P. 0. Box 259 Anchorage, Alaska Office Address Room 505 Cordova Building Telephones: Office - BR 5-0511 Night - BR 4-9141 FE 3-4722 51W Se( Sel i0• 10• 10• 10- 10- 10 - UNITED STATES DEPARTMENT OF THE INTERIOR GEOLOGICAL SURVEY Form approved. Budget Bureau No. 4E -R856.5. Lum OMCE LEASE NUMBER ----- �d�.� --------------- UNIT ----------------- ------77----- -------- LESSEE'S MONTHLY REPORT OF OPERATIONS State Alaska _ CountyT37ind-ZiLdinial_Dist� ecda Wildcat --------------------------------------- The --- -- - -- ------ The following is a correct report of operations and production (including drilling and producing wells) for the month of - Dntober-------- , 19-61------------------------------------------------------------ ------------------ --- ------------- .40ant's address ------fig¢-est seet�n -a4ve t- - ---- Company-fiaekathm' n -D04 -Anr_hnra$e, -_Alaska. - - Sinned /E—S/ A< Phony SR_4-93".21..------------- .... ., ..-._ __------ -4 east's title ---_--Geologist ---------- ---- sac. AN11 ;j Or jj Tier. RANaE WXLL NO. n.:a PCppaC.p Ia . BAEEEOr On GRAVITY cu. Yr. or Goa (III thmwnds) GAUM ar GASOLrm RECOVEIIED BARR= 01F REMARKS of depth: U abut down. cause: WATZR (I( ��an readent teat i `saeo]laa none, so state) Cont 14NW 4. 1 N3 4- Present De : 2407 feet ;. 21 yard Ateridian Casing: 406 ft. 8-518 in. surf ce casingcemented with 175 sacks of c� structi n cement. 1-2-6 Wc rki g on rig. 2392 ft, 14 lb. T-55 5-12 °! C..b g cemented with acks of construction cehaent. .3-61 Ra i1a ole th tubing and tit. Found top of c nment at 2065 feet. Drdled out cement to 114, 50 feet. 4-61 Palledtubingandbitoatofhole. Pla ed weead on asi.ng. 5-61 W rki on -..-ig. 6-61 Perforated 2 holes at 2105 ft. for WS0 test. 110 fluid ntry. Pe for ted 2 holes at 1990 f t for iATSO est. No fluid a ry. (4.holes per foot) frorn 2068 ft. to 207 it. Recovered 514 ft. of water i 15 3ninutes. los »in well for 16 minutes, opened valve and re ove ed a water flovr ata approx= Late rate of 18 bt ls. per hour. Water became clear and sa 'ne after 2 hours, 10 minul as total flow time. As ll arnotmt of inflarnmil le gas was obsF-ry d, but t2e gas did not " h d" into ewaterdolumi. Well shutihafter four hours total flo . 7-61 Casing perforations s eeze cemented with 35 sacks of construction cement and lop cemen plug set at 197 i feet. Removed well head and placed a cernent plug the top of the i-1/2" casing wiffi 10 sacks of cor stru ction cement. W all suspen ied. D ENOWE D Noxhl.—There were ---- ._None ---------------- ----- runs or sales of oil; ......... Mae.-------- ----------------- M cu. ft of $as sold; hOl] i�lViwtOil ---- ----- __.._----------- rune or sales of gasoline during the month. (Write "no" wh T'% t i ,ion Nora.—Report on this form is required for each calendar month, regardless of the status of liMic�d a , lad in duplicate with the supervisor by the 6th of the succeeding month, unless otherwise directed by the supervisor. Farm 8-848 Ie -2576" u. s. aovatmu r rmerma wase: (ranuary leap) 50 ANCHORAGE d ro 601M UNITED STATES LANo OFFICE An -db- rA&4________________ DEPARTMENT OF THE INTERIOR I nsE 14UMBE919332 -------------------- _ GEOLOGICAL SURVEY War --- ------ –---- -..---------------------- LESSEE'S MONTHLY REPORT OF OPERATIONS State _ __-Alaska ---- Count r�.jrd_ Judicial Diet. Ilield ___Wildcat The folloudnLF is a correct report of operations and production (including drillinj and producing rnetls) for the moria of Juiy--& _Augt►e t --..._-._ ..__, Ilii--� ---------------------- -------------------- ----------------------- -------- .4fent's address ______fl@t ,�5>QAS�_-AIA._...--------- ------- Company O]C1Gl_ilti �ampa1g_____ Anchorage, Alaska �:�1�e -------------------------- --- -- ---.--------------------------- -------------------- Signed -- - ii#� -�;-- - --- --- --------------- Phone --- ----------------.-DA__Z_4.1-81---------------_._._.- ...----------- ---- .agent's titleGOR1 i91Ali------_------------------- SRF. AND TWr. IRANazl WELL `YDArn m or �( Sec. 21 tofNA SN cc. Aas File CU. FT. or 4an fiatzaNs or B==807 REMARKS — — gAaaare Or 4Q Claamr GABOLtNR J WATER (L( I (St drMin . 4 t: H.hut down, eau..: E 1y 12, 19 1 i J41y 19, 1901 ly 229 1901 t 28, of Mines 11961 tbotl3And!) REMVEREO Clone, w state) dtlr a ratdt ut tat !ar aa.olio. _ wnkat od w.) f f i pud Roast No. 4A Well I Grilled 12� in. holy to 4081feet ;at 406 fa of of 8 5,8 in. su rface casing th 175 a of c ns tract an cement sated bop to 1750 joi for 30 minutes vidhout prassure lies rifled ahead to 21 0 feet ith 7 7/8 in. bite Cored an interval from 2190 ft. to 2204 ft. lith 2 foot recoverr gilled she ad to 23 1 feet om August 31, Vic rale N01� SEP 13 1951 1961 U.S. GEO(OGICAL SURVEY ALjlr-h ge. Alaska NoTm.—There were ----- XQ----------------- ------ rut u or sAhz ht oii l r, -N --------------- ------------- _ M cu. ft. of gas sold, -------- _-_---- _--.--- runs or sales of gasoline -during the mon rete "no" where applicable.) NoTE.—Report on this form is required for each calendar month, regardless of the Btitus of operations„ and must be filed in duplicate with the supervisor by the 8th of the suoGpeding month, unless otherwise diredad by the supervisor. Form 9-889 (,.=Y 1850) 16116766-6 U. 8..oralltltolT rmININd orrlcr Pbtm 9-881a (Feb. 1961) .AGEBudgvt B mu No, Approval= 14-31-M. ! Land ofric. __ Ancho r awe SEP(Wfr jJJIN TRIPLICATE) 019332 Lase TIo- ----------------_..-_______ GEOLOGM T§QV$TATES unit --- ---------------___..� OF F THE INTERIOR GEOLOGICAL SURVEY SUNDRY NOTICES AND REPORTS ON WELLS U+ NOTICE OF INTENTION TO DRILL_________________ --------r----------- SUBSEQUENT REPORT OF WATER SHUT-OFF-_ --__-------.--- NOTICE OF INTENTION TO CHANGE PLANS _____________________--____ SUBSEQUENT REPORT OF SHOOTING OR ACIDIZING--_.-.-___--- G NOTICE OF INTENTION TO TEST WATER SHUT-OFF.. ------------ ------ SUBSEQUENT REPORT OF ALTERING CASING -__--_____---_--_.- ---.. O NOTICE OF INTENTION TO R&DMI:L-OR REPAIR WELL --------- -- X__ SUBSEQUENT REPORT OF RX -DRILLING OR REPAIR..--------- O R OTICE OF INTENTION TO SHOOT OR ACIDIZE.................. ------ sURSEQUENT REPORT OF ABANDONMENT ---------------------- �7 IOTICE OF INTENTION TO PULL. OR ALTER CASING __ ______________ SUPPLEMENTARY WELL HISTORY----------------------------------- --- � 4i •a M O OTICE OF INTENTION TO ABANDON WELL-_--.-------------- - - -- --------------------------------- -- ---- -____!;.!;L;===;=---- --^--- -- - ----------------------------------- ----- +3 CD ------------------------•----------------- -- ----------.. 0 t (INDICATE ABOVE BY CHECK MARK NATURE OF REPORT. NOTICE. OR OTHER DATA) 4-1 CD 0--.-----�SePtember 251..------------------r 19 61 q.�. ca Rosetta Rosetta Well No. ....... is located -1876 __ ft. from__ � } line and AM ------ ft. from � �am`w ---• l line of sec..W 4-1rd AiSW/4 NW/4 Sec. 21 18 N 3 W Seward --------�--Bec.ant Sec. No.) T(blerldian) x,e Wildcat ildcat lcld) Third Judi, -i - fvsioP.» _..AlAsk �-------------------------- ---- --Cutdiciiou) -_ (State or Territory) P. res > The elevation of the derrick floor above sea level is ----- .2.1?___ ft. 0 Cd DETAILS OF WORK PO C (State names or And expected depths to objective In` pains, lana aliliother Important propos•d wo'lengths of aosed casings Indicate mudding job., umant- .0 o o present Depth: 2407 ft. 1 b `2 Casing; 406 ft. 8 5/8 in. surface casing cemented with 175 sacks m of construction cements M m 4:1 2392 ft. 14 lb. J 55 5'k in. casing cemented with 450 sacks c a m of construction cement. o roperforated Intervals: I, to � ( 2 holes/ft. ) 21551-21651; 21751-2195+; 22251-22351 We now propose to squeeze cement the three perforated intervals with 150 sacks of construction cements and prepare to test upper sands for possible productions between 20651 and 20801. 1 understand that this plan of work must receive approval In wrlting by the Geological purvey before operations may be comnmeneed. Company _-Hackathoxn Drilling Co1.P. Y--------------------- ___ Address _____715 ._Midland Savings Building Denver 2, Colorado cc. I,laska Division of Mines & Minerals BY -------- William D. Fa1ta Title __-Geolozi&t______ -- aro 602040 W/. S St 9 =1 6 D UNITED STATES DEPARTMENT OF THE INTERIOR GEOLOGICAL SURVEY Farm pppcoced. Budjret Biareau No. 42-$366.6. ts110 a Ice chorage -- LUSE NUMBER ----------------------- -------- UNtT----------------- ............ --.------ LESSEE'S MONTHLY REPORT OF OPERATIONS 13istrict State Alaska------------- -- County Third Judicial Meld ------Wildcat The following is a correct report of operations and production (including drilling and producing wells) for the month of ------ --Septe* ,!1qL -------, 19A1. -- -- ---------------------------------------------------------------------- 134 East Second Avenue Hackathorn Drilling Company .qb sot's address------------------------------------------------------------�___-- Company ----------------------------- Anchora�et _Alaska ___-- _ Siaraed ---------- ------ __ b -- -------------------------------------------------------- Phone ----- 4474 521-------------------------------------------------------- .4dent's title Geolo&i st-------------------------------- BEC. ANI) 31 OF Twp. �rWP. RATQR N4. Dan Paoavccn BAIIB&I9 Or alt. (7SA7ITY Cu. Fr. or ass (Int17011siud9) iiALLQNB or OLL�E RECDS7:Bl D B LRRRLB or Wersu fIf none, so state) REMARKS (If drri! , depth; u.hnt dawa, aanae: � � �L o! trt fled eawllaa eongat a! ps) MW/4 18 3W -A Casing: 406 ft. 8-5/8 in. surface casing cemented with :c. 21 175 sacks of cOnstruction cement. ;ward qerl diam (1 -3 e 1)6 1 Drilled ahead from 2325 ft, to 2407 ft., T. D. (3/61 R E - Log a3Ld sonic log. (4/61 Ran Z392. ft. 14 1b. J- 5 5-1.1211 casing and cemented v%'th 450 sacks of C01 LStructioncement. Ra i a neutrc n log X7/61 Pe for ted casing in filo ' g locatio s with 1/211 jet: 22251 - 22351 2 hol s per fo t 21741 Z1941 11 11 t1 n 21531- Z1631 It I1 11 11 Well intai ed a spo adic I low of infl mmabl gas an4 salt water on a 48-hour test (10-1!/61 Moved accee sory eeni from dr' site to Anchorage Gas & Oil camp, Waiting; on packer. 116/61 Entered well. with tubing and tension packer. Set packer at 2215 ft. and to ted ower perforated interval. A s oradic flow of ge s and salt water was obtained from thiE horizon fora period of 24 hours. Page 1 of Z pages D ES 9 19 62 Co servation Division U.S. t. OLOGICAL SURVEY --b-7 .-..- Nom—There were ----------------------------------- rune or sales of oil; -------------- ----- M cu. ft. of gas sold; -------- __-------- -..----- _____________ runs or sales of gasoline during the month. (Write "no" where applicable.) Norm.—Report on this form is required for each calendar month, regardless of the status of operations, and must be filed in duplicate with the supervisor by the 8th of the succeeding month, unless otherwise directed by the supervisor. PbrIn 9-829 16-RSrea� v. s, wveaaxiMi nmrrlNa o�rtee (7Saus T S46e) UNITED STATES DEPARTMENT OF THE INTERIOR GEOLOGICAL SURVEY Form approved. Bud¢et Bureau No. 42-R966.6. LAND Of'FiCE Anchorasp�! ___._»---_-_ii_�_»._ LEM NUMBER .__ _a i 933 2 _._..._-- UNrr --------------- --------------------------- LESSEE'S MONTHLY REPORT OF OPERATIONS __-- County Third-Jucliciai District _Wildcat StateAlaska --------------------- - - - -- ------------------------------------------- The -- --- ---------...--- - _ -- ----- The following is a correct report of operations and production (ineZudin2 drillings and producinj wells) for the month. of Se2texrber __, 19 b I -I --------------------------------- ------------------------ ---------___ .lgent's address 134 East Second Avenue Company Hackathorn Drillin _-Cc�,.___------ Anchara e�_ _l ia_ska--------_ -- ---- -- -- Sisned crL ------------------------------ -- ----- - --- Phone ______ ,BR_ 4-9521 ------- -d ent's title ---- ni(?Ri,Et-------------------------------- SEC. AND 1-1-1, WELL Dila IrCf7. FT. OM CiA9 QALtexs or ] BARlii 9 or REb3AxKgOp,�R`Wr. AAxosNo. psanucen BdBEELS OP OIZ I QaditrY �Intbousmd,G� (icOrElL7E Wars at ���d�muutt a tat fm=n1If shut tae InHCOCEHEU none, so state) mutent of =w) (Contin+ ed ron� Pa a 1) 9/17/6] 9/20/61 9/26/6 9/26-301/61 Resetacket at 2167 f sit water vv ,Ue i nflar the water column. 5 Thi welIl way allowed 1 in ui ' character or f. Pai i ed tubing and pack SqOee4 ceented casi ce#aentunder 1500 psi at .21D I Oi fe et. I ChangeChangel radiator on m I I . and testing resulted iU an int eased flow of ma b 1e gas continued to sporadically flow into flow for 48 Jurc; without a no iceable change )w rate. I g ou of the ho a and akUt well in. Pe (orations with 100 sacks of construction xnji pressure and pla0ed top o cement plug �r d repair d starts ai g mato on same. o MUTE D FB 91982 2 of 2 pages Con ervation Division U.S. GEOLOGICAL SURVEY Aj chorage, Alaska Nom.—There were – ----- Ndnt' __-__ runs or sales of oil None -----»__»..._ , -__---------------------------_..-------_---Mau. ft. of gas Bald; ----- ________ None ........ _........... runs or sales of gasoline during the month. (Write "no" where applicable.) NATE.--Report on this form is required for each calendar month, regardless of the status of operations, and must be filed in duplicate with the supervisor by the 8th of the succeeding month, unless otherwise directed by the supervisor. Form 8�a39 Usnuarq 76—p67ae-p L. �. 40Y[[NNSN7 MINtIMa e/IItL uo) Form 5-381A (Feb. 14sq }AIC ,SAGE Appro.-all p res L-31- t (SURAUT IN TRIPLICATE) Landotn .__--Anchorage_ UNITED STATES Lassoo. "-019332 DEPARTMENT OF THE INTERIOR vnit--- -------- _- __M_____�-.� GEOLOGICAL SURVEY SUNDRY NOTICES AND REPORTS ON WELLS NOTICE OF INTENTION TO DRILL ----- —------------- _----- ------ ------SUBSEQUENT REPORT OF WATER SHUT-OFF --------- .------------- NOTICE OF INTENTION TO CHANGE PLANS ___________________.__—X. SUBSEQUENT REPORT OF SHOOTING OR ACIDIZING._._�___�_._ -- -- NOTICE OF INTENTION TO TEST WATER SHUT-OFF ---- .,,.,.,-_--- ------ SUBSEQUENT REPORT OF ALTERING CASING --------------- ---�__...� NOTICE OF INTENTION TO RE -GRILL OR REPAIR WELL ... ...,... ______ SUBSEQUENT REPORT OF RE -DRILLING OR REPAIR-_-___--___.._.—__. NOTICE OF INTENTION TO SHOOT OR ACIDIZE------------------ - SUBSEQUENT REPORT OF ABANDONMENT ----------- --------- ---_---. NOTICE OF INTENTION TO PULL OR ALTER CASING_..i.,----,_, SUPPLEMENTARY WELL HISTORY______________ _ .-_..—__. --------._------ NOTICE OF INTENTION TO ABANDON WELL --------- __..-...,,,..._ ------ ---------------------------+-------------------- -- --------- ---- (INDICATE ABOVE BY CHECK MARK NATURE OF REPORT, NOTICE, OR OTHER DATA) ------------- ------_.. egtEmb er--- -t --------------- -----r 19 Rosetta Well No. is located .1876. ft. from._ line and 4� 6--..- ft. from line of sec..___J ---------- t-"� (y Bee- And 1k ¢, No) (Twp,) (Range) (bferidian) __..-. _. Houston ----- ---------- ---Third---Judicial--Di isign ---------� Alaska q) _L`i (Field) (County yr Subdiviplon) Btgte Territor -__ -_ _ — T'-) The elevation of the derrick floor above sea level is ___32.6__ ft. DETAILS OF WORK `"` (State names of and expected depths to objective sands-, show sizes, weights1and lengtha of pro Asad eaaingal Indicate rnudding jobs, cement ` Ing points, and all other Important proposed work acy Present Depth: 2407 ft. Casing: 406 feet 8-5/8" surface casing cemented with 175 sacks of construction cement. We now propose to test the well in the following manner: 1. Run E --Log and Sonic Logs 2. Rae 2392 ft of 14# J55 5-1/2" casing and cement with 450 sacks of construction cement. 80Run Neutron Log and selectively perforate attractive sands and test for production. 4. Comilete well, if commercial SEP 8 IM1 U.S. GEOLOGICAL SURVEY ChOXZndAjM jhat this plan of work must receive approval In writing by the Ceological _urrey before operations may be commene.d- Company -------- HACKATHORN__DRILLI-NG-COMPARY------------------------- --- _.�-.._...-..�__-------_.__�_.. Address------------7_l5__Mid1.and__.Saya.ngs._ Building -----------------------D eriver---2 :---.CQ1ox-ad o --- By William D. Folta Title _Gfologist.------_--------- aro 4112040 rl V G AA. L 0 C A T I 0 H S K E T C H Qs�r July 2hth, 1261 Al r7 20 /6 ROSETTA �- a- H Z J r Rash T TA .3 '~ DEEPEN OR PLUG BACK APPUCA ON 'PER iT"TO %LL, NAME OF Address Name Of ~Vell location . '. ~ A~ICAT!Q~ ~TO DRILL ~ . .~ D.E:.~.PEN [] PLUG BACK ~ DATE State Cel~ I Elevstion (g~ve footage from section lines) Section~township~ran~e or block & survey feet Field & resc~o'i~ (~f:~:i,[dca~ so..st~te)~-~.~: ~o m;~ . ~ :~ ~:~ ..... ,,~.ou.n_~ ~ - : ,_ . ' ~ ~l~cat ~ ~is Distance, in miles, and direction from nearest town or post office [ Distance from proposed location to nearest drilling, to property or lease line:Nearest distance from proposed location ~Ic° ,t d.. o~. ' d--.~e~t' ~o~a~% .'ea~'u,~ ~ Proposed depth: Rot~ar¥ or cable tools ] Approx. date work will start Number of wells on lease, including this well, completed in or drilling to this r~ervoir: I Address Number of acres in lease: 2,~0 acres If lease, purchased with one or more Name wells drilled, from whom purchased: Al~c~ 0a~ & 0il ~evel~t, I~ac.. ,East ~d Ave.., Inchon, Alaska Status of bond Remarks: (If this is an application to deepen or plug back, briefly describe work to be done, giving present producing zone and expected new producing zone) #e ln. epese to ti, ill tl~is well ia ~ f,llowiag ~aa~e~: - (1) ~tll ~~~ ~I0 f~t ~ t2~ inch bolo; ~ ~p~x. ~ f~. of ~ ~8 inch (2) Ias~L~ test bl~ ~tioa ~~t. s~s ~ est~lish ~.~Jito ~r shu~fs. (:~} Sel~tt~ ~o~te ~~tive $~s ~ test for pr~ton a. neceu8~, ~ " /~ ~m ~~' CERTIFICATE: I, the ~dersigned, state that I am the (company), and that I am author~ed by said comply to make this report; and that this report was pre- pared ~der my supervision and ~ection and that ~e facts stated there~ are true, correct and ~mplete to ~e best of my ~owledge. ~.~:~__ Permit Number: , 27-61 Approval Date: Ju_ly 3- 1961 ^' dh{ef, P~trole~ Brach Notice: Before sen~g ~ this form be sure that you have given aH ~formation requested. Much ~ecessary correspond- ence will thus be avoided. ;See ~struction on Reverse Side of Form Alaska Off and Gas Conservation Commission Application to Drill, Deepen or Plug Back Form No. P-1 Authorized by Order No. I Effective October 1, 1958 ";, "'/ C OR DRILL PIPE FLOAT SHOE OTHER DATA ON NECESSITY /~ bk~C~ED WiTH :_. TYPE ':~:~' ' CEMENT DATA ~ULK? ....... .SACK[D?~IXED TYPE BRM,ID OF' .JOB INVOICE SEt'TION S£RVlCi~ &NO IllIN?AL. BASE CHARGE ADD'N O'I~RGE EXTRA TRUCK STAND BY TRUCK MILEAGE .... by thi~ J in U. S A. J · TAX ": -' *)::":' ' TOTAl. :. ~,., ,,..:~:~i~I~:' .:~.~ · . ,, - (.~ ,J , :x,~:- :'.- '~ [.~'~ F;'.:h~:~',~,...~' ~'",. Dote; Sur w by tria .xation and calculations Yeasured angle at Rosetta too. 41 bncksight center of crown: block Rosetta No. 3s fore— sight Rosetta No. l -- 10109t Measured distance Rosetta No. h -- to No. 3,.. 1, 22.1: feet. NOIED $ AUG I JUL 28 i�61 U.S. GEOLOGICAL- SUPW f 1 jlllorin 9-01 a (Feb. 1961) (SUBMIT IN TRIPLICATE) UNITED STATES DEPARTMENT OF THE INTERIOR GEOLOGICAL. SURVEY SUNDRY NOTICES AND REPORTS ON Budget Bureau No. 42-113A&I• � Approts<1 esgEb lZ-�t�p, Lina Unit Jill[ 26 1981 WELLS NOTICE OF INTENTION TO DRILL -------------- »_,,,_---____•-_._ -- ACni,horAge. SUBSEQUENT REPORT OF WATER sHUT-0FF----------_---_--_--- _A) NOTICE OF INTENTION TO CHANGE PLANS-_....____ . SUBSEQUENT REPORT OF SHOOTING OR ACIDIZING______M___ -__—. NOTICE OF INTENTION TO TEST WATER SHUT-OFF _...... ----- ------ SUBSEQUENT REPORT OF ALTERING CASING ----------------- — __- NOTICE OF INt&NTiON TO RE -DRILL OR REPAIR WELL.,,._—_- ______ • SUBSEQUENT REPORT OF RE -DRILLING OR REPAIR___—»______ NOTICE OF INTENTION TO SHOOT OR ACIDIZE___.............. »____ SUBSEQUENT REPORT OF ABANDONMENT __..._____.»----_»--» ---- NOTICE OF INTENTION TO PULL. OR ALTER CASING__-__.._»__- .___.. SUPPLEMENTARY WELL HISTORY ------------- »_»------------ -- NOTICE OF INTENTION TO ABANDON WELL---------------------- ------ ----------------------------------------------------------•--------- ----- (INDICATE AAOVE BY CHECK MARK NATURE OF RM -ORT, NOTICE, OR OTHER DATA) .q) -r ------- .?n1:e--2-4-1 ---------------- -------------- ------ 19-41 Rosetta fNj Well No. _1'_ is located 1-__ ft. from__ Wline and _.}____ ft, from �W1 fine of sec..____.» 1 r, !^' t= ---------__SL-- - '----- __.c } -__---------- 'S'eac.`No i--�- ---- % (TWP-) (R -Ta) � laa'erldlaa) --------- • "let --- ------ - ;�----------,7} Meld) l ; or Bablyaa� taie ofTerrita --- The elevation of the derrick floor above sea level is ft. DETAILS OF'WORK (State names of and expected depth. to objective sandsI show dzes. weights and fenxtl+s of pro Geed easlnes Indicate muddins job., eemontr inE paints, and all other Important proposed workl We propose to drill this, well In the following va er: (1) Drill approximately 410 feet of 12-, inch hole; rug approx. 4(Y) ft. of 1, 5/6 Ince surface casin,; and ceiient to surfacse {2} Install and tont blo,out prevention cQuil:INEnt. (3) drill ahead. to 5,000 ft,, log the hole, anal cerPnt casinj throu'�ea fa7orable zones and establizh requicite water :hW'L.--offs. {4} Selectively Ferforatw attractive snnds and test for production as recessary. (5) Complete gall if cor. srcial. APPROVED AS PROPOSED AAib ALSO SUBJECT TO ATTACHED REQUIREMEP TS. M. H. SOYSTER, OIL f: GAS SUPERVISOR 1 understand that this plan of work must receive approval In writing by the Geological Surrey before operations may be commented. eJULY 5, 1961 Company ---- ----- es ----------------------- ---- »_»-------- ---------------- Address ...___ --Calcrado ------------------ -- By Villiara Is. talta -------- - ----------------- Title .StooJ.ot�it ...-----------------------_ GPD 9 16 507 C{-!: I *71' - Hackathorn Drilling. Company__ 1 cc atic Houston Field Anchorage. 019332.. Willing c7azwticns 5_-_ i'Laciz, F=no W J. to BA12 nrO LabjVk Q the 2, Wkiarce. AS Federal U11% Op�,rtt:L_, AM! KIM% K ea.hhe IsINted promptly to tht Reliant! Oil & lun WycrAvory WA V: CSS We OEM SP;00VQ Of W3 Goo srpar7kcr; 7 12�'.:'w_" Licl.?fno QuVACal 10"o, dilwationna conveys. 10! arviyac a , ytrwtlgraphi'l A im, QMO_ ane sin 13 or i YAW! an shn? I Le nownsad in eupinatc. jAvOrNA-Agn WK Ant"; bnooy,; and & WMICA tcahj `.'a a5 ci-= the racoW arc availahis, Gthw data not PwInda2y ..:::witted ahall 'a MWIn.ci In' Cjr :.-.('g ar:d YOU SONY, TOO ti'r rj,�w of SO cperntor, LA Plac SAW w7bsr bzd thu numher an -A JAW11 6 -7"tIts, out prevention 0 rul,W .0 -ft, n"n-Jin-'I:'.) QN, Rams WOU1102 touted wx%-'I;nlly _,30nal presduzu, 0: PloraLAca5 (Turn 9 .32') wvw ir nil operviiLw-, pnd produation on thiq leave snauld Le MAW; in dupIUM ykar tc vj;;: 4iftounS of the fAlowing nouch, 03 V"-Gaa Swrewwr Gal Gan forwQuA I - 1 _ _ + - { _ — l - r- _ _ _ t_ -- y� _ _ - ^ , - -_- - - _ , }— - !! -